Cities Index.
Agenda

Roseville City Council
January 19, 2022

Document
Agenda
Meeting
January 19, 2022
Body
Roseville City Council
Pages
50
Original file
274.2 MB
Text extracted from the city's file for reading and search. Open the original on rosevilleca.api.civicclerk.com. That file is the official record.

H. Modified duty assignments are limited to ninety (90) days. Should an employee have a disability that requires accommodation beyond ninety (90) days, a new assignment must be located and approved by the Human Resources Director. The new assignment must involve job tasks/duties which are different from those performed in previous modified duty assignments. In no case will a modified duty assignment be continued once an employee has reached a permanent and stationary status.

I. Modified duty shall be limited to three (3) ninety (90) day assignments. Upon completion of the third modified duty assignment the employee shall be removed from work until released to return to full duty or deemed permanent and stationary. The employee may use any benefits available to them at that time.

J. When an employee is assigned a modified duty assignment, the employee shall be compensated for hours worked at the regular rate of base salary and benefits regardless of whether or not the employee performs work within the regular classified position or is assigned to the employee’s regularly assigned department. If an employee is assigned to a modified duty assignment of less than full time, compensation for hours worked may be supplemented by either accrued sick leave or other available leave.

ARTICLE IV. LONG TERM VACANCIES
All vacancies are filled on a rank-for-rank basis in accordance with existing department Call Back Procedures. This does not prohibit the Working Down provision in Article I above. Effective July 01, 2014, when a vacancy becomes long term (greater than 30 days), the vacancy will become a “floating” vacancy.

Floating vacancies are to be filled with NO preference given to unit or station assignment. NO “reset” of a floating vacancy will be applied if the vacancy is moved to a different unit or shift assignment.

ARTICLE V. MODIFIED DUTY

1. Employees who are on a 24 hour shift schedule and who are placed in a modified duty assignment which is expected to last more than one (1) full pay period shall be assigned to a 40-hour work schedule the first day of the pay period following the modified duty assignment. All payroll calculations, to include leave balances, holidays and CTO shall be transitioned to a 40-hour work week calculation. Holiday leave usage will be applied per the 40-hour work week holiday schedule.

2. Employees who have returned to full duty status by a health care provider during the first week of a pay period will be transitioned from the 40-hour work week to a 24 hour shift schedule at the beginning of that pay period. Employees who have returned to full duty status by a health care provider during the second week of a pay period will be transitioned from the 40-hour work week to a 24 hour shift schedule at the beginning of the following pay period. All payroll calculations, including leave balances, holidays and CTO shall be transitioned back to a 24 hour shift schedule.

Roseville Firefighters, Local 1592 - Term of Agreement: 1/1/1922-12/31/2125 Page 35 Memorandum of Understanding
CHAPTER 7. MISCELLANEOUS ISSUES
ARTICLE I. NON-DISCRIMINATION
The Union hereby certifies that it has no restrictions on membership based on race, color, creed, sex, national origin or political affiliation or any other status or basis prohibited by law.

ARTICLE II. UNFAIR LABOR PRACTICES
The parties hereto recognize the following as an unfair labor practice which violates the meet and confer process:

A. Discussion between employees and individual members of the City Council on matters or issues which are the subject of negotiations between employee representatives and representatives of the City Council.

B. Discussion between City Personnel Relations Committee members and individual members of the Union of matters or issues which are the subject of negotiations between City Personnel Relations Committee members and representatives of Local 1592, I.A.F.F.

ARTICLE III. SENIORITY
A. Employees shall be placed on the seniority list in accordance with the date they were first placed on the payroll of the Roseville Fire Department as regular or limited term full-time employees.

When two (2) or more employees are assigned to the payroll on the same date, preference in placement on the department seniority list shall be given based on relative standing on the Roseville Firefighter hiringeligibility list. The hiring list is defined as the candidate ranking based on a final examination process determined at the conclusion of the recruitment, which may be the certified employment list (as defined by Personnel Rule 3.05.110) or a list determined by further candidate testing following the establishment of the certified employment list. The hiring list, established by the Fire Chief or his designee, will be provided to the Human Resources Department for the official record.

B. Placement on the department seniority list shall not be affected by leaves of absence duly granted for medical reasons where such medical disability was incurred in the course and scope of the employee's official duties.

C. A correct copy of the seniority list as of January 1 of each year shall be provided to the Union in March of each year, and a currently correct copy made available for inspection at reasonable times to employees upon request.

D. For promotions, seniority at their respective ranks shall be determined by the date of promotion to the higher job class (rank). When two (2) or more employees are promoted on the same date to the same job class, preference in placement on the seniority list shall be given based on promotional list provided to Human Resources when established for the official record.

E. The department seniority list shall be maintained by the Fire Department.

Roseville Firefighters, Local 1592 - Term of Agreement: 1/1/1922-12/31/2125 Page 36 Memorandum of Understanding
ARTICLE IV. UNION ACTIVITIES
A. The Union may place one bulletin board in each fire station for the purpose of communicating normal and usual Union business to the membership.

1. Specific placement of such boards within a station shall be subject to the approval of the Fire Chief.
a. The officially designated Union representative in each station shall be responsible for maintaining such board.
b. The Fire Chief reserves the right to prohibit the posting and order the removal of, material that the Chief reasonably concludes will be disruptive of the operation of the Fire Department.
c. Claims of arbitrariness on the part of the Fire Chief in this regard shall fall under the grievance procedure hereinafter provided.
d. The Union will keep the Fire Chief notified in writing of the names of its designated representatives in each station.

2. The Union may use the Training Room at the Fire Training Facility (Hilltop) for a meeting place for its membership once a month or for any special meetings necessary for completing Union business.

These membership meetings will be held after the normal work day.

B. Members of the Employee Affairs Committee shall be granted leave from duty with full benefits for the purpose of negotiating terms of an agreement when such meetings take place at a time during which such members are scheduled to be on duty. The Fire Chief shall make the final determination as to manpower availability.

C. Members of the Employee Affairs Committee shall be granted leave from duty with full benefits for all meetings and hearings between the City and the Union for the purpose of resolving a grievance when such meetings or hearings take place at a time during which such member is scheduled to be on duty.

D. The City and RFF agree to the establishment of an RFF Time Bank for use by employees for the sole purpose of performing or conducting association business subject to the following conditions:

1. RFF members may donate only vacation or compensation time off (CTO) hours from an association member’s accrued leave balance for such hours. Such donation shall be voluntary, non-revocable and not returnable to the employee. Donations will be allowed only during the first pay period in February of each year.

2. The maximum number of hours any member shall donate is eight (8) hours per year.

Any remaining unused hours in the time bank on December 31st shall be carried over into the next calendar year. The maximum number of hours that can be accrued is not to exceed eight (8) hours per represented employee per year.

3. Time bank hours shall not be used without prior approval of RFF representatives. All time submitted to payroll for reimbursement from the bank must have RFF and department approval. RFF will be responsible for circulating and collecting donation forms and submitting these forms to the Human Resources Department. The Human Roseville Firefighters, Local 1592 - Term of Agreement: 1/1/1922-12/31/2125 Page 37 Memorandum of Understanding
Resources and Finance Departments will be responsible for processing the appropriate donation forms and any payment(s).

4. RFF members assume any tax liability for being assessed vacation or CTO hours and/or using Time Bank hours. Hours donated to association members shall not be considered time worked for overtime, retirement, or any other benefit purpose. However, any donated hours will be subject to applicable state and federal payroll taxes.

ARTICLE V. SAFETY
A. The City shall continue to provide for the safety of employees during the hours of their employment. In this regard, the City agrees that it will receive and consider written recommendations with respect to unsafe working conditions or other safety ideas in the area of working conditions from any employee or the Union; and the employees and the Union agree that they will forward their safety recommendations and ideas to the City.

B. The City shall take all reasonable and readily available precautions when employees' assigned duties are performed under generally known extraordinarily life endangering conditions not normally associated with fire fighting and fire safety and prevention activities.

C. To the extent reasonably ascertainable by the City, fire fighting equipment provided and maintained by the City shall be reasonably safe and adequate for its normal and intended use.

Provided however that nothing herein is to be construed to mean that the City assumes the liability of any other party, or waives any rights, defenses to liability or causes of action that it may have in law or equity.

ARTICLE VI. MEMBERSHIP DUES AND AUTHORIZED DEDUCTIONS
A. The Association shall be entitled to have membership dues and other lawful deductions of its members deducted from their paychecks in accordance with the procedures required by law and set forth herein. To the extent required by Government Code Sections 1157.3 and 1157.12, the City shall honor employees’ voluntary authorizations for Association dues deductions from employee paychecks. Such authorized deductions shall be remitted monthly to Association along with an adequate itemized record of deductions. The City shall make every reasonable effort to remit the amounts deducted within ten (10) working days following the payday on which the deductions were made.

B. In making such authorized membership dues deductions, the City shall rely on written certification from the Association confirming that the Association has and will maintain authorizations signed by each individual employee from whose paychecks the deduction is to be made that the individual affirmatively consents to the dues deduction in a manner that meets the requirements of state and federal law, including but not limited to applicable provisions of Government Code Sections 1150-1157.12 and the First Amendment of the United States Constitution. After providing the required certification, the Association shall not be required to provide a copy of individual authorizations to the City unless a dispute arises about the existence or terms of the authorization. To the extent required by law, the City will rely on information provided by the Association in writing regarding whether dues deductions were properly cancelled or changed.

Any requests from the Association that the City change dues deductions shall include a certification that the changes are requested with the affirmative consent of the individual employee(s) and otherwise comply with all requirements of state and federal law.

C. The amount of membership dues shall be set by the Association. All changes in dues deductions shall become effective the first of the month following written notification to the City Chief Financial Officer.

Roseville Firefighters, Local 1592 - Term of Agreement: 1/1/1922-12/31/2125 Page 38 Memorandum of Understanding
D. The City agrees to direct all employees to the Association with regard to any questions or concerns related to membership dues or any other mutually agreed payroll deduction. The City agrees to send requests to cancel or change dues deductions to the Association.

E. The City agrees to provide to Association on a monthly basis a payroll dues deduction report.

F. The employee's earnings must be regularly sufficient, after other legal and required deductions are made, to cover the amount of the dues check-off authorized. When an employee, in good standing in the Association, is in a non-pay status, for the full pay period when his/her dues would normally be withheld, no dues deduction will be made to cover that withholding from the current or future earnings; nor will the employee deposit the amount with the City which would have been withheld if the employee had been in a pay status during that period. In the case of an employee who is in a non-pay status during only a part of the pay period and the salary is not sufficient to cover the full withholding, no deduction shall be made. In this connection, all other legal and required deductions have priority over Association dues.

G. The Association shall indemnify, defend, protect and hold harmless the City and its elected and appointed officials, officers, employees, officers and agents (collectively hereafter the “Indemnitees”) from and against any and all claims, liabilities, losses, damages, fines, penalties, claims, demands, suits, actions, causes of action, judgments, costs and expenses (including, but not limited to, reasonable attorneys’ fees and court costs) arising from the application of any provisions under this Article, including, but not limited to, any claims made by any member employees for the membership dues deductions the City made in reliance on the Association’s certification, and any claims made by any member employees for any deduction cancellation or modification the City made in reliance on the information provided by the Association, provided that the City promptly notify the Association of any such matter for which it is seeking indemnification after the City has knowledge of the occurrence of such matter.

H. In the event any such action or proceeding is brought against the City by reason of any such claim, the Association, upon notice from the City, covenants to defend such action or proceeding by counsel reasonably satisfactory to the City. Further, the Association agrees to indemnify and hold harmless the Indemnitees for any loss or damage arising from the Association’s actions or inactions under this Article.

ARTICLE VII. CAUSES FOR DISCIPLINE (Refer to Section 3.16.020, Personnel Rules) The Fire Department uses The City of Roseville Fire Department Administrative Investigation Manual as a guideline.

The discipline of City of Roseville employees, including Roseville Firefighters (RFF) members, may be by written reprimand, suspension, demotion, discharge, transfer for purposes of corrective measures or other actions not inconsistent with the provisions of the City Charter, and is governed by Article VIII of the City Charter, Section 8.04 Personnel Rules, Subsection (i), and Roseville Municipal Code Chapter 3.16 and applicable law including Government Code Section 3250 et. seq.

Roseville Municipal Code Section 3.16.020 provides details regarding the Causes for Discipline and Section 3.16.030 outlines the Types of Discipline available. Should the performance of an RFF member warrant some form of discipline, the type and imposition of discipline will be governed by the Roseville Municipal Code and applicable law including Government Code Section 3250 et. seq.

Roseville Firefighters, Local 1592 - Term of Agreement: 1/1/1922-12/31/2125 Page 39 Memorandum of Understanding
ARTICLE VIII. (Intentionally left blank)
ARTICLE IX. NO STRIKE (CONCERTED ACTION)
Union agrees that for the term of this Agreement, the Union and its members shall not call or engage in any strike, slowdown, suspension or stoppage of work activity, or sanction any such conduct by unit employees, and the City agrees that it shall not cause or engage in any lockout.

ARTICLE X. MINIMUM SCORES AND COMPUTATIONS
Refer to Municipal Code Section 3.05.070 for selection process applicant scoring.

ARTICLE XI. CERTIFICATION OF ELIGIBLES AND APPOINTMENTS Refer to Municipal Code Section 3.050.110 (B) and 3.06.030 Appointments.

ARTICLE XII. HEALTH MAINTENANCE PHYSICALS
When, in the opinion of the City Manager, Human Resources Director, or department head, it would be in the best interest of the City or a specific function of City service to evaluate the medical or psychological condition of any candidate or employee, the Human Resources Director may schedule such employee(s) for an examination with a physician, or other appropriate licensed health professional, selected by the City and at City expense. The results of such examination shall be available to the Human Resources Director, City Manager, and the department head as may be appropriate in the same manner as new employee examinations. Each employee is independently responsible for compliance with the advice and suggestions made by the physician/licensed health professional as a result of such examination. All nonindustrial care, treatment, or other requirements recommended by the physician/licensed health professional shall be at the expense of the employee. The City shall receive from the City-selected physician/licensed health professional a notice of examination completion, whether or not further treatment or specialized diagnosis is required, and a certification that the employee is able to continue job performance. In the event an employee is certified by the City physician/licensed health professional as unable to continue performance of the duties assigned to the position, that employee shall not return to the active service until such time as the employee is determined by the City physician/licensed health professional to be permanently able to continue job performance.

ARTICLE XIII. TOWELS/LINENS
The City agrees to provide towels, sheets, linens and pillow cases (linens) at each fire station.

Employees will be responsible for washing and drying linens in conjunction with other station housekeeping duties.

ARTICLE XIV. STATION ASSIGNMENTS
The City agrees to maintain a Standard Procedure Manual Policy regarding a method by which employees may express their preference for station assignments.

ARTICLE XV. NO SMOKING
Employees hired on/after January 1, 2004 must be tobacco free and cannot use tobacco products on or off duty.

Roseville Firefighters, Local 1592 - Term of Agreement: 1/1/1922-12/31/2125 Page 40 Memorandum of Understanding
ARTICLE XVI. ALCOHOL AND DRUG POLICY
City and Union agree to continue to enforce the current Alcohol and Drug Abuse Policy.

In addition to the above-mentioned policy, all employees will be required to notify the City in writing of any criminal drug statute conviction for a violation occurring in the workplace not later than five (5) calendar days after such conviction.

ARTICLE XVII. REMOTE EMAIL ACCESS
Employees will be allowed to enter into a remote email access agreement with the City of Roseville as described in the Administrative Regulations. Employees understand that this voluntary policy is being adopted for their convenience and no compensation will be provided as a result of incidental access to the City’s email system.

ARTICLE XVIII. TEMPORARY LAYOFF/FURLOUGH
A. Temporary layoff under this section is defined as the City’s temporary reduction or abolition of an employee’s allocated position. Temporary layoffs shall not exceed twelve (12) working days per a twelve (12) month notice period. The reduction in employee salary will be equalized over the twelve (12) month period following the first day of furlough.

B. The City Manager may exempt employees from one (1) or more furlough days based on the operating needs of the City.

C. Employees may request specific furlough days off in eight (8) hour increments, subject to management approval.

D. There shall be no reduction in the City’s contribution to retirement, health, dental, vision, life, and LTD as a result of employees being furloughed.

E. Furlough days shall be counted as time worked for purposes of retirement credits.

F. Accrued furlough leave shall have no cash value.

NOTICE OF TEMPORARY LAYOFF/FURLOUGH
The Human Resources Director shall provide written notice to each department classified employee affected by a temporary layoff (furlough) at least fifteen (15) calendar days prior to the effective date of the action. Notice shall be personally delivered to the employee, or sent by U.S. first class mail to the employee’s last known address. The notice will state the duration of the temporary layoff. An employee may respond to the notice but shall not have a right to appeal such action.

BUMPING
Employees who are subject to a temporary layoff are not eligible to exercise bumping rights under this chapter.

ARTICLE XIX., EDUCATIONAL REIMBURSEMENT
Employees may be reimbursed for the tuition and fees connected with approved job related educational courses not to exceed $500 per year for Firefighter/Paramedic I/II, $400 per year for Fire Engineer and Roseville Firefighters, Local 1592 - Term of Agreement: 1/1/1922-12/31/2125 Page 41 Memorandum of Understanding
$300 per year for Fire Captain. The cost of books is not covered in this Agreement. The employee will submit the request for reimbursement to the Training Battalion Chief, who will accept or reject the request. The request must be made before the class has been completed. The request will then be forwarded with the Fire Chief’s recommendation to the Human Resources Department, who will make the final decision to accept or reject the request. No payment will be made until the final proof of a passing grade is submitted to the Human Resources Department. The City has established a $6,000 educational reimbursement fund to be administered by the Human Resources Department. Once the fund balance is depleted, no further reimbursements will be approved.

ARTICLE XX. LIMITED TERM
Pursuant to Section 3.06.095 of the City’s Personnel Rules, the following shall apply to Firefighter Paramedic limited term appointments.

A. A limited term employee appointed from a certified hiring list to a Firefighter Paramedic limited term position shall have their service in the limited term position counted toward their probationary period in classified service should they be transferred, in accordance with Personnel Rule 3.07.030, to a regular Firefighter Paramedic position without a break in City service.

B. At the conclusion of at least every three months the limited term Firefighter Paramedic’s performance shall be evaluated in the manner described in Personnel Rule Section 3.06.150.

C. A limited term Firefighter Paramedic who is transferred from a limited-term position to a regular Firefighter Paramedic position, at the sole discretion of the Fire Chief, having the same salary range and substantially similar duties, shall be compensated at the same step in the salary range as previously received without a change in the anniversary date.

D. Salary Step Advancement. A merit step increase may be granted to a limited term Firefighter Paramedic employee pursuant to City’s Personnel Rules 3.11.030, subject, but not limited, to the following:

1. “Anniversary date” means the date upon which an employee first appears on the City payroll due to original appointment to the Firefighter Paramedic limited-term position, and in which the employee becomes eligible for salary advancement consideration.

1.2.A limited term Firefighter Paramedic shall be provided with an employee evaluation in accordance with Chapter 3.14 of the Personnel Rules.

E. Limited term Firefighter Paramedic employees shall be at-will employees and shall be entitled to health insurance, CalPERS retirement, retiree health savings account, long term disability, holiday pay, vacation and sick leave and other benefits, on the same terms and conditions as a newly hired regular status employee.

F. The length of service and service credit shall start from the initial date of hire as a limited term Firefighter Paramedic and be deemed continuous service upon the transfer to a regular Firefighter Paramedic position without a break in service.

G. Nothing in this Article shall change the at-will, temporary status of a limited term appointment.

H. In all circumstances, appointments made based on this provision or into regular service are at the sole discretion of the Fire Chief.

Roseville Firefighters, Local 1592 - Term of Agreement: 1/1/1922-12/31/2125 Page 42 Memorandum of Understanding
The terms and conditions of this Memorandum of Understanding are executed this day of by the Employer-Employee representatives whose signatures appear below on behalf of their respective organizations.

CITY OF ROSEVILLE: ROSEVILLE FIREFIGHTERS’:
________________________________ _____________________________

DOMINICK CASEY GABE MICHAEL
City Manager President
_________________________________ ______________________________

TIM DAVIS JERRY CAMOUS
Chief Negotiator Chief Negotiator
_________________________________ ______________________________

BRIAN DIEMER WILL RABY
Member, Negotiating Team Member, Negotiating Team
_______________________________ ______________________________

JAMIE PEPIN MATT PICCHI
Member, Negotiating Team Member, Negotiating Team
_______________________________

DION LOUTHAN MATT WALLING
Member, Negotiating Team Member, Negotiating Team
_______________________________

AJMEER KHALIQI MATT MCCAULEY
Member, Negotiating Team Member, Negotiating Team
Roseville Firefighters, Local 1592 - Term of Agreement: 1/1/1922-12/31/2125 Page 43 Memorandum of Understanding
APPENDIX “A”

ROSEVILLE FIREFIGHTERS CLASSES
3375 FIRE & ENVIR SAFETY INSPEC I
3377 FIRE & ENVIR SAFETY INSPEC II
3320 FIRE CAPTAIN
3340 FIRE ENGINEER
3382 FIRE INSPECTION SUPERVISOR
1022 FIRE & ENVIR INSPECTION SUPERVISOR
3380 FIRE INSPECTOR I
3385 FIRE INSPECTOR II
3350 FIREFIGHTER-EMT I
3353 FIREFIGHTER-PARAMEDIC I
3355 FIREFIGHTER-PARAMEDIC II
3454 HAZARDOUS MATERIALS INSPECTOR
Roseville Firefighters, Local 1592 - Term of Agreement: 1/1/1922-12/31/2125 Page 44 Memorandum of Understanding
APPENDIX “B”

SURVEY AGENCIES
City of Sacramento
Davis
Fairfield
Folsom
Lodi
ReddingRocklin
Sacramento Metropolitan Fire Protection District
South Placer Fire Protection District
Vacaville
City of West Sacramento
El Dorado Hills Fire Department
Consumnes Community Services District Fire Department
ORDINANCE NO. 6446

ORDINANCE OF THE COUNCIL OF THE CITY OF ROSEVILLE AMENDING ORDINANCE NO. 6307, THE SALARY ORDINANCE FOR EMPLOYEES REPRESENTED BY ROSEVILLE FIREFIGHTERS, LOCAL 1592, AS AMENDED BY APPENDIX “A”, TO BE EFFECTIVE JANUARY 15, 2022 AS AN URGENCY MEASURE
THE CITY OF ROSEVILLE ORDAINS:

SECTION 1. Title and Purpose.

Ordinance No. 6307, the Salary Ordinance for Roseville Firefighters, Local 1592, is hereby amended as shown on Appendix “A” for salary schedules A & B attached hereto, to reflect wage increases and Salary Schedule B compressed salary range.

SECTION 2. Salary Schedule Effective Date.

A Classification Salary Plan adopted by this Ordinance shall be effective January 15, 2022 as an urgency measure.

SECTION 3. Urgency Ordinance.

This ordinance is hereby declared to be an urgency measure, immediately necessary for the public peace, health and safety and shall take effect January 15, 2022. A statement of urgency is as follows:

It is necessary to amend the Salary Ordinance to comply with recently approved changes for the orderly and necessary continuance of operations of the City.

SECTION 4. Posting.

The City Clerk is hereby authorized and directed to post a true copy of the foregoing ordinance in each of three (3) conspicuous locations in the City and she shall immediately after such posting enter in the Ordinance Book under the record of the ordinance a certificate under her hand stating the time and place of said publication by posting.

PASSED AND ADOPTED by the Council of the City of Roseville this day of , 20 , by the following vote on roll call:

AYES COUNCILMEMBERS:

NOES COUNCILMEMBERS:

ABSENT COUNCILMEMBERS:

MAYOR
ATTEST:

City Clerk
RFF Roseville Fire Fighters
Association

City of Roseville

Appendix:A
Effective Date:01/15/2022
Salary Schedule: Roseville Fire Fighters
Association-A
Grade Code Grade Name Step Name Hourly Bi-Weekly Monthly Annual 3320ZA Fire Captain 8Hr-ZA Step A 41.0132 3281.06 7108.95 85307.46 Step B 43.0637 3445.10 7464.37 89572.50
Step C 45.2169 3617.35 7837.60 94051.15
Step D 47.4779 3798.23 8229.50 98754.03
Step E 49.8517 3988.14 8640.96 103691.54
Step F 52.3443 4187.54 9073.01 108876.14
Step G 54.9614 4396.91 9526.64 114319.71
Step H 57.7097 4616.78 10003.01 120036.18
3320A Fire Captain-A Step A 29.2948 3281.02 7108.87 85306.46 Step B 30.7597 3445.09 7464.35 89572.25
Step C 32.2978 3617.35 7837.60 94051.19
Step D 33.9125 3798.20 8229.43 98753.20
Step E 35.6084 3988.14 8640.97 103691.66
Step F 37.3887 4187.53 9072.99 108875.89
Step G 39.2581 4396.91 9526.63 114319.59
Step H 41.2211 4616.76 10002.99 120035.84
RFF Roseville Fire Fighters
Association

City of Roseville

Appendix:A
Effective Date:01/15/2022
Salary Schedule: Roseville Fire Fighters
Association-A
Grade Code Grade Name Step Name Hourly Bi-Weekly Monthly Annual 3340ZA Fire Engineer 8Hr-ZA Step A 37.4119 2992.95 6484.73 77816.75 Step B 39.2828 3142.62 6809.02 81708.22
Step C 41.2471 3299.77 7149.50 85793.97
Step D 43.3093 3464.74 7506.95 90083.34
Step E 45.4747 3637.98 7882.28 94587.38
Step F 47.7486 3819.89 8276.42 99317.09
Step G 50.1359 4010.87 8690.22 104282.67
Step H 52.6431 4211.45 9124.80 109497.65
3340A Fire Engineer-A Step A 26.7227 2992.94 6484.71 77816.50 Step B 28.0590 3142.61 6808.98 81707.81
Step C 29.4620 3299.74 7149.45 85793.34
Step D 30.9349 3464.71 7506.87 90082.43
Step E 32.4817 3637.95 7882.23 94586.71
Step F 34.1058 3819.85 8276.34 99316.09
Step G 35.8111 4010.84 8690.16 104281.92
Step H 37.6020 4211.42 9124.75 109497.02
RFF Roseville Fire Fighters
Association

City of Roseville

Appendix:A
Effective Date:01/15/2022
Salary Schedule: Roseville Fire Fighters
Association-A
Grade Code Grade Name Step Name Hourly Bi-Weekly Monthly Annual 1022A Fire and Environmental Inspection
Supervisor-A
Step A 41.0132 3281.06 7108.95 85307.46
Step B 43.0638 3445.10 7464.39 89572.70
Step C 45.2170 3617.36 7837.61 94051.36
Step D 47.4780 3798.24 8229.52 98754.24
Step E 49.8518 3988.14 8640.98 103691.74
Step F 52.3444 4187.55 9073.03 108876.35
Step G 54.9616 4396.93 9526.68 114320.13
Step H 57.7098 4616.78 10003.03 120036.38
3375A Fire and Environmental Safety
Inspector I-A
Step A 32.0758 2566.06 5559.81 66717.66
Step B 33.6800 2694.40 5837.87 70054.40
Step C 35.3638 2829.10 6129.73 73556.70
Step D 37.1320 2970.56 6436.21 77234.56
Step E 38.9886 3119.09 6758.02 81096.29
Step F 40.9381 3275.05 7095.94 85151.25
Step G 42.9848 3438.78 7450.70 89408.38
Step H 45.1343 3610.74 7823.28 93879.34
RFF Roseville Fire Fighters
Association

City of Roseville

Appendix:A
Effective Date:01/15/2022
Salary Schedule: Roseville Fire Fighters
Association-A
Grade Code Grade Name Step Name Hourly Bi-Weekly Monthly Annual 3377A Fire and Environmental Safety
Inspector II-A
Step A 35.2833 2822.66 6115.77 73389.26
Step B 37.0476 2963.81 6421.58 77059.01
Step C 38.9001 3112.01 6742.68 80912.21
Step D 40.8451 3267.61 7079.82 84957.81
Step E 42.8871 3430.97 7433.76 89205.17
Step F 45.0314 3602.51 7805.44 93665.31
Step G 47.2831 3782.65 8195.74 98348.85
Step H 49.6476 3971.81 8605.58 103267.01
3350A Firefighter EMT I-A Step A 21.9566 2459.14 5328.13 63937.62 Step B 23.0545 2582.10 5594.56 67134.70
Step C 24.2071 2711.20 5874.26 70491.08
Step D 25.4175 2846.76 6167.98 74015.76
Step E 26.6887 2989.13 6476.46 77717.49
Step F 28.0228 3138.55 6800.20 81602.39
Step G 29.4242 3295.51 7140.27 85683.27
Step H 30.8954 3460.28 7497.28 89967.40
RFF Roseville Fire Fighters
Association

City of Roseville

Appendix:A
Effective Date:01/15/2022
Salary Schedule: Roseville Fire Fighters
Association-A
Grade Code Grade Name Step Name Hourly Bi-Weekly Monthly Annual 3353ZA Firefighter Paramedic I 8Hr-ZA Step A 37.4119 2992.95 6484.73 77816.75 Step B 39.2828 3142.62 6809.02 81708.22
Step C 41.2471 3299.77 7149.50 85793.97
Step D 43.3093 3464.74 7506.95 90083.34
Step E 45.4747 3637.98 7882.28 94587.38
Step F 47.7486 3819.89 8276.42 99317.09
Step G 50.1359 4010.87 8690.22 104282.67
Step H 52.6431 4211.45 9124.80 109497.65
3353A Firefighter Paramedic I-A Step A 26.7227 2992.94 6484.71 77816.50 Step B 28.0590 3142.61 6808.98 81707.81
Step C 29.4620 3299.74 7149.45 85793.34
Step D 30.9349 3464.71 7506.87 90082.43
Step E 32.4817 3637.95 7882.23 94586.71
Step F 34.1058 3819.85 8276.34 99316.09
Step G 35.8111 4010.84 8690.16 104281.92
Step H 37.6020 4211.42 9124.75 109497.02
RFF Roseville Fire Fighters
Association

City of Roseville

Appendix:A
Effective Date:01/15/2022
Salary Schedule: Roseville Fire Fighters
Association-A
Grade Code Grade Name Step Name Hourly Bi-Weekly Monthly Annual 3355ZA Firefighter Paramedic II 8Hr-ZA Step A 37.4119 2992.95 6484.73 77816.75 Step B 39.2828 3142.62 6809.02 81708.22
Step C 41.2471 3299.77 7149.50 85793.97
Step D 43.3093 3464.74 7506.95 90083.34
Step E 45.4747 3637.98 7882.28 94587.38
Step F 47.7486 3819.89 8276.42 99317.09
Step G 50.1359 4010.87 8690.22 104282.67
Step H 52.6431 4211.45 9124.80 109497.65
3355A Firefighter Paramedic II-A Step A 26.7227 2992.94 6484.71 77816.50 Step B 28.0590 3142.61 6808.98 81707.81
Step C 29.4620 3299.74 7149.45 85793.34
Step D 30.9349 3464.71 7506.87 90082.43
Step E 32.4817 3637.95 7882.23 94586.71
Step F 34.1058 3819.85 8276.34 99316.09
Step G 35.8111 4010.84 8690.16 104281.92
Step H 37.6020 4211.42 9124.75 109497.02
RFF Roseville Fire Fighters
Association
City of Roseville
Appendix:A
Effective Date:01/15/2022
Salary Schedule: Roseville Fire Fighters
Association-B
Grade Code Grade Name Step Name Hourly Bi-Weekly Monthly Annual 3320ZB Fire Captain 8Hr-ZB Step A 43.8235 3505.88 7596.07 91152.88 Step B 45.8832 3670.66 7953.09 95437.06
Step C 47.2597 3780.78 8191.68 98300.18
Step D 48.6774 3894.19 8437.42 101248.99
Step E 50.1378 4011.02 8690.55 104286.62
Step F 51.6419 4131.35 8951.26 107415.15
Step G 53.1912 4255.30 9219.81 110637.70
Step H 54.7869 4382.95 9496.40 113956.75
Step I 56.4305 4514.44 9781.29 117375.44
RFF Roseville Fire Fighters
Association
City of Roseville
Appendix:A
Effective Date:01/15/2022
Salary Schedule: Roseville Fire Fighters
Association-B
Grade Code Grade Name Step Name Hourly Bi-Weekly Monthly Annual 3320B Fire Captain-B Step A 31.3025 3505.88 7596.07 91152.88 Step B 32.7737 3670.65 7953.08 95437.01
Step C 33.7569 3780.77 8191.67 98300.09
Step D 34.7696 3894.20 8437.42 101249.08
Step E 35.8127 4011.02 8690.55 104286.58
Step F 36.8871 4131.36 8951.27 107415.24
Step G 37.9937 4255.29 9219.80 110637.65
Step H 39.1335 4382.95 9496.40 113956.75
Step I 40.3075 4514.44 9781.29 117375.44
RFF Roseville Fire Fighters
Association
City of Roseville
Appendix:A
Effective Date:01/15/2022
Salary Schedule: Roseville Fire Fighters
Association-B
Grade Code Grade Name Step Name Hourly Bi-Weekly Monthly Annual 3340ZB Fire Engineer 8Hr-ZB Step A 40.8825 3270.60 7086.30 85035.60 Step B 42.8040 3424.32 7419.36 89032.32
Step C 44.0881 3527.05 7641.94 91703.25
Step D 45.4107 3632.86 7871.19 94454.26
Step E 46.7731 3741.85 8107.34 97288.05
Step F 48.1763 3854.10 8350.56 100206.70
Step G 49.6215 3969.72 8601.06 103212.72
Step H 51.1102 4088.82 8859.10 106309.22
Step I 52.6435 4211.48 9124.87 109498.48
RFF Roseville Fire Fighters
Association
City of Roseville
Appendix:A
Effective Date:01/15/2022
Salary Schedule: Roseville Fire Fighters
Association-B
Grade Code Grade Name Step Name Hourly Bi-Weekly Monthly Annual 3340B Fire Engineer-B Step A 29.2017 3270.59 7086.28 85035.35 Step B 30.5742 3424.31 7419.34 89032.07
Step C 31.4914 3527.04 7641.91 91702.96
Step D 32.4362 3632.85 7871.18 94454.21
Step E 33.4092 3741.83 8107.30 97287.59
Step F 34.4115 3854.09 8350.52 100206.29
Step G 35.4439 3969.72 8601.05 103212.64
Step H 36.5072 4088.81 8859.08 106308.97
Step I 37.6024 4211.47 9124.85 109498.19
RFF Roseville Fire Fighters
Association
City of Roseville
Appendix:A
Effective Date:01/15/2022
Salary Schedule: Roseville Fire Fighters
Association-B
Grade Code Grade Name Step Name Hourly Bi-Weekly Monthly Annual 1022B Fire and Environmental Inspection
Supervisor-B
Step A 41.4706 3317.65 7188.24 86258.85
Step B 43.4197 3473.58 7526.08 90312.98
Step C 44.7223 3577.78 7751.87 93022.38
Step D 46.0640 3685.12 7984.43 95813.12
Step E 47.4459 3795.67 8223.96 98687.47
Step F 48.8693 3909.54 8470.68 101648.14
Step G 50.3354 4026.83 8724.80 104697.63
Step H 51.8454 4147.63 8986.54 107838.43
Step I 53.4008 4272.06 9256.14 111073.66
RFF Roseville Fire Fighters
Association
City of Roseville
Appendix:A
Effective Date:01/15/2022
Salary Schedule: Roseville Fire Fighters
Association-B
Grade Code Grade Name Step Name Hourly Bi-Weekly Monthly Annual 3375B Fire and Environmental Safety
Inspector I-B
Step A 32.7832 2622.66 5682.42 68189.06
Step B 34.3240 2745.92 5949.49 71393.92
Step C 35.3537 2828.30 6127.97 73535.70
Step D 36.4143 2913.14 6311.81 75741.74
Step E 37.5068 3000.54 6501.18 78014.14
Step F 38.6320 3090.56 6696.21 80354.56
Step G 39.7909 3183.27 6897.09 82765.07
Step H 40.9847 3278.78 7104.01 85248.18
Step I 42.2142 3377.14 7317.13 87805.54
RFF Roseville Fire Fighters
Association
City of Roseville
Appendix:A
Effective Date:01/15/2022
Salary Schedule: Roseville Fire Fighters
Association-B
Grade Code Grade Name Step Name Hourly Bi-Weekly Monthly Annual 3377B Fire and Environmental Safety
Inspector II-B
Step A 36.0649 2885.19 6251.25 75014.99
Step B 37.7600 3020.80 6545.07 78540.80
Step C 38.8928 3111.42 6741.42 80897.02
Step D 40.0596 3204.77 6943.66 83323.97
Step E 41.2613 3300.90 7151.96 85823.50
Step F 42.4992 3399.94 7366.53 88398.34
Step G 43.7742 3501.94 7587.53 91050.34
Step H 45.0874 3606.99 7815.15 93781.79
Step I 46.4400 3715.20 8049.60 96595.20
RFF Roseville Fire Fighters
Association
City of Roseville
Appendix:A
Effective Date:01/15/2022
Salary Schedule: Roseville Fire Fighters
Association-B
Grade Code Grade Name Step Name Hourly Bi-Weekly Monthly Annual 3350B Firefighter EMT I-B Step A 23.6203 2645.47 5731.86 68782.31 Step B 24.2109 2711.62 5875.18 70502.14
Step C 24.8162 2779.41 6022.06 72264.77
Step D 25.4365 2848.89 6172.59 74071.09
Step E 26.0724 2920.11 6326.90 75922.83
Step F 26.7243 2993.12 6485.10 77821.16
Step G 27.3923 3067.94 6647.20 79766.38
Step H 28.0772 3144.65 6813.40 81760.81
Step I 28.7790 3223.25 6983.70 83804.45
RFF Roseville Fire Fighters
Association
City of Roseville
Appendix:A
Effective Date:01/15/2022
Salary Schedule: Roseville Fire Fighters
Association-B
Grade Code Grade Name Step Name Hourly Bi-Weekly Monthly Annual 3353ZB Firefighter Paramedic I 8Hr-ZB Step A 40.8825 3270.60 7086.30 85035.60 Step B 42.8040 3424.32 7419.36 89032.32
Step C 44.0881 3527.05 7641.94 91703.25
Step D 45.4107 3632.86 7871.19 94454.26
Step E 46.7731 3741.85 8107.34 97288.05
Step F 48.1763 3854.10 8350.56 100206.70
Step G 49.6215 3969.72 8601.06 103212.72
Step H 51.1102 4088.82 8859.10 106309.22
Step I 52.6435 4211.48 9124.87 109498.48
RFF Roseville Fire Fighters
Association
City of Roseville
Appendix:A
Effective Date:01/15/2022
Salary Schedule: Roseville Fire Fighters
Association-B
Grade Code Grade Name Step Name Hourly Bi-Weekly Monthly Annual 3353B Firefighter Paramedic I-B Step A 29.2017 3270.59 7086.28 85035.35 Step B 30.5742 3424.31 7419.34 89032.07
Step C 31.4914 3527.04 7641.91 91702.96
Step D 32.4362 3632.85 7871.18 94454.21
Step E 33.4092 3741.83 8107.30 97287.59
Step F 34.4115 3854.09 8350.52 100206.29
Step G 35.4439 3969.72 8601.05 103212.64
Step H 36.5072 4088.81 8859.08 106308.97
Step I 37.6024 4211.47 9124.85 109498.19
RFF Roseville Fire Fighters
Association
City of Roseville
Appendix:A
Effective Date:01/15/2022
Salary Schedule: Roseville Fire Fighters
Association-B
Grade Code Grade Name Step Name Hourly Bi-Weekly Monthly Annual 3355ZB Firefighter Paramedic II 8Hr-ZB Step A 40.8825 3270.60 7086.30 85035.60 Step B 42.8040 3424.32 7419.36 89032.32
Step C 44.0881 3527.05 7641.94 91703.25
Step D 45.4107 3632.86 7871.19 94454.26
Step E 46.7731 3741.85 8107.34 97288.05
Step F 48.1763 3854.10 8350.56 100206.70
Step G 49.6215 3969.72 8601.06 103212.72
Step H 51.1102 4088.82 8859.10 106309.22
Step I 52.6435 4211.48 9124.87 109498.48
RFF Roseville Fire Fighters
Association
City of Roseville
Appendix:A
Effective Date:01/15/2022
Salary Schedule: Roseville Fire Fighters
Association-B
Grade Code Grade Name Step Name Hourly Bi-Weekly Monthly Annual 3355B Firefighter Paramedic II-B Step A 29.2017 3270.59 7086.28 85035.35 Step B 30.5742 3424.31 7419.34 89032.07
Step C 31.4914 3527.04 7641.91 91702.96
Step D 32.4362 3632.85 7871.18 94454.21
Step E 33.4092 3741.83 8107.30 97287.59
Step F 34.4115 3854.09 8350.52 100206.29
Step G 35.4439 3969.72 8601.05 103212.64
Step H 36.5072 4088.81 8859.08 106308.97
Step I 37.6024 4211.47 9124.85 109498.19

COUNCIL COMMUNICATION
CC #: 1893
File #: 0321
Title:

Digital Billboard Project – Mitigated Negative Declaration, Mitigation Monitoring and Reporting Program, and Ground Leases and Subleases Approval Contact: Robert Cline 916-746-1172 [email protected] Meeting Date: 1/19/2022
Item #: 9.1.

RECOMMENDATION TO COUNCIL
Staff recommends that the City Council take the following actions:
1 . Adopt a resolution to adopt the Mitigated Negative Declaration and approve the Mitigation Monitoring and Reporting Program for the Digital Billboard site located at 260 S Harding Boulevard; and

2. Adopt a resolution authorizing the City Manager to execute a Ground Lease and Memorandum of Ground Lease at 260 S Harding Boulevard with “Candice L. Stephenson and J. Wayne Strauch, Co-Trustees of the Administrative Trust Created Under That Survivor’s Trust Under “Trust Agreement and Declaration of Trust” Dated March 15, 1984, as to an undivided one- half (1/2) interest and Candice L. Stephenson and J. Wayne Strauch, Co-Trustees of the Administrative Trust Created Under That “Marital Trust” Under “Trust Agreement and Declaration of Trust” Dated March 15, 1984, as to an undivided one-half (1/2) interest.” and further authorize the City Clerk to record the Memorandum of Ground Lease; and

3. Adopt a resolution authorizing the City Manager to execute a Sublease and Memorandum of Sublease with Clear Channel Outdoor at 260 S Harding Boulevard and further authorize the City Clerk to record the Memorandum of Sublease;

4. Adopt a resolution authorizing the City Manager to execute a Ground Lease and Memorandum of Ground Lease at 290 Conference Center Drive with Roseville Junction, LLC and further authorize the City Clerk to record the Memorandum of Ground Lease; and,

5. Adopt a resolution authorizing the City Manager to execute a Sublease and Memorandum of Sublease with Clear Channel Outdoor at 290 Conference Center Drive and further authorize the City Clerk to record the Memorandum of Sublease.

BACKGROUND
Since the adoption of Measure B in 2018, staff has continued evaluating opportunities to create additional revenue sources. One such opportunity is the Digital Billboard Project which presents an opportunity to produce millions of dollars in General Fund revenue over its life cycle and would provide a valuable marketing tool for the community and its businesses. There are two existing digital billboards in the City of Roseville, both are eastbound reads located on I-80. One is owned by the Roseville Automall (operated by Outfront Media) and the other is the City’s board located at Golfland SunSplash and operated in conjunction with Clear Channel Outdoor.

In April 2020, staff released the Digital Billboard Project Request for Proposals (RFP) and received three proposals. After staff evaluation of the proposals, it was determined there was too much variability between the proposals to move forward with a recommendation to City Council.

Therefore, in August 2020, staff rejected all proposals in order to further refine the scope of the Digital Billboard project and obtain direction from City Council. In October 2020, City Council provided the following direction:

1. Construct up to four (4) digital billboards with a maximum of two (2) on Interstate 80 and two (2) on State Route 65;

2. Construction timeframe within two (2) years from commencement of services; and,

3. Release the RFP without incorporating additional signage within the City (i.e. additional CMS signs for marketing and smaller digital signage near regional commercial zoned districts).

Based on City Council direction, staff issued a revised Digital Billboard RFP in December 2020.

The City received five (5) proposals from the following proposers: Clear Channel Outdoor, Outfront Media, Marquee Media, Media Choice and Foster Interstate. The proposals were evaluated by the following criteria:

Following extensive review by the evaluation committee, Clear Channel Outdoor (CCO) was unanimously selected as the City’s number one proposer based on the stated evaluation criteria.

A copy of the Master Scoring Sheet is provided as Attachment 10. Additionally, CCO proposed the fewest number of signs with two locations and the highest guaranteed revenue to the City.

Staff, Clear Channel and both property owners have since arrived at mutually-agreeable lease terms and staff is recommending City Council approval of the associated documents.

PROJECT DESCRIPTION
SITE LOCATIONS:

Interstate 80:

The proposed digital billboard will be constructed at 260 S Harding Boulevard (APN 014-183- 029-000), a vacant parcel located directly adjacent to westbound lanes on I-80 and just south of Douglas Boulevard. The billboard would be located in a vacant, commercially-zoned and developed area of the City.

Project simulation: Westbound and eastbound I-80
State Route 65:

The proposed digital billboard will be constructed at 290 Conference Center Drive in the northern corner of the parcel (APN 363-011-086-000). The sign placement is proposed directly adjacent to southbound lanes on Hwy-65 and just north of the Galleria Boulevard overcrossing. The billboard would be located in a commercially-zoned and developed area of the City.

Project simulation: Northbound and southbound Hwy-65
Attachment 9 shows a map of existing and proposed digital billboards along Interstate 80 and Highway 65 in Roseville and Rocklin. Each proposed sign will mimic the appearance of the Golfland Sun Splash billboard and include “City of Roseville” on the pole as shown in Figure C below. During initial negotiations, staff secured Preliminary Determination approvals for both sites from Caltrans. This Preliminary Determination approval process must be completed prior to submitting for Caltrans permits and determines the viability of a site.

GROUND LEASES & SUBLEASES:

I-80 and Douglas Boulevard:

The sign will be placed on property owned by “Candice L. Stephenson and J. Wayne Strauch, Co-Trustees of the Administrative Trust Created Under That Survivor’s Trust Under “Trust Agreement and Declaration of Trust” Dated March 15, 1984, as to an undivided one- half (1/2) interest and Candice L. Stephenson and J. Wayne Strauch, Co-Trustees of the Administrative Trust Created Under That “Marital Trust” Under “Trust Agreement and Declaration of Trust” Dated March 15, 1984, as to an undivided one-half (1/2) interest” and will be leased to the City for $60,000.00 per year with 2% annual escalations starting year eleven totaling $1,270,123.00 over 20 years. The City will subsequently sublease the property to CCO for purposes of erecting and operating a digital billboard. The full Ground Lease and Sublease are attached (Attachments 1 and 3). Major deal points include the following:

Term of the Agreement – Initial term of 20 years with the right by CCO to extend for an additional five years for a total term of 25 years. If not extended by CCO, the Sublease will automatically expire after the 20 year term concludes.

Financial Terms –
Conditional Signing Bonus: CCO shall pay the City a one-time “conditional signing bonus” of $25,000.00 within five business days following the execution of the Sublease Agreement (“Effective Date”). The conditional signing bonus would be refunded should CCO not be able to obtain necessary permits from Caltrans.

Additional Signing Bonus: CCO shall pay the City one-time “Additional Singing Bonus” of $225,000.00 within five business days after the date the Operation Phase begins.

Annual Rent: Commencing with the Operations Phase, CCO shall pay to the City “Base Rent” equal to the greater of 1) $380,000 with 2% annual escalations thereafter or, 2) 45% of the gross revenue attributed to the billboard. Rent shall be paid to the City in twelve (12) equal installments. If 45% of annual gross revenue is greater than the annual Base Rent, CCO shall pay the City the difference annually.

Additional Consideration: CCO shall commit space to the City within one (1) eight (8) second advertising spot in a standard rotation of eight (8) slots, to be divided equally between the two display faces on the Digital Billboard at all times for the advertisement of City messages.

State Route 65/290 Conference Center Drive:

The sign will be placed on property owned by Roseville Junction LLC and will be leased to the City for $60,000.00 per year with 2% annual escalations starting year eleven totaling $1,270,123.00 over 20 years. The City will subsequently sublease the property to CCO for purposes of erecting and operating a digital billboard. The full Lease and Sublease are attached (Attachments 2 and 4). Major deal points include the following:

Term of the Agreement – Initial term of 20 years with the right by CCO to extend for an additional five years for a total term of 25 years. If not extended by CCO, the Sublease will automatically expire after the 20-year term concludes.

Financial Terms –
Conditional Signing Bonus: CCO shall pay the City a one-time “conditional signing bonus” of $25,000.00 within five business days following the execution of the Sublease Agreement (“Effective Date”). The conditional signing bonus would be refunded should CCO not be able to obtain necessary permits from Caltrans.

Additional Signing Bonus: CCO shall pay the City one-time “Additional Singing Bonus” of $175,000.00 within five business days after the date the Operation Phase begins.

Annual Rent: Commencing with the Operations Phase, CCO shall pay to the City “Base Rent” equal to the greater of 1) $300,000 with 2% annual escalations thereafter or, 2) 45% of the gross revenue attributed to the billboard. Rent shall be paid to the City in twelve (12) equal installments. If 45% of annual gross revenue is greater than the annual Base Rent, CCO shall pay the City the difference annually.

Additional Consideration: CCO shall commit space to the City within one (1) eight (8) second advertising spot in a standard rotation of eight (8) slots, to be divided equally between the two display faces on the Digital Billboard at all times for the advertisement of City messages.

Additionally, both Subleases include the following terms:

Exclusive Right – City agrees to grant CCO an exclusive right to display outdoor advertising on the premises and agrees not to authorize any other off-site outdoor advertising on Cityowned or City-controlled property within 1,500 feet of the proposed digital billboards.

No Cost to City – CCO shall be responsible for all costs associated with: preparation of plans, securing permits and approvals, sign installation (including extension of utilities), sign operation, and sign maintenance.

Termination Rights – The Sublease outlines termination rights of both the City and CCO.

For example, the City may terminate the agreement should CCO breach its obligation to pay rent. Conversely, CCO may terminate if the view of the message display from Interstate 80 or State Route 65 is materially obstructed and CCO did not cause the obstruction. Other termination provisions apply, see Section 7: Early Termination Rights, of each Sublease (Attachment 3 and 4) for a complete description.

Indemnification – CCO shall indemnify, defend, protect, and hold harmless the City from and against all liabilities that arise directly or indirectly from CCO’s possession or use of the premises(s) and/or sign (including any verbal or non-verbal display on the sign).

Message Content:

Pursuant to the terms of the Subleases, messaging and content displayed on the signs will be managed by CCO. However, the Subleases specify that CCO may not display any message that, in the reasonable judgment of the City Manager or City Manager’s designee, meets any of the following criteria:

Is false, misleading, or deceptive;
Promotes, directly or indirectly, establishments engaged in sexually oriented business activities;
Contains “obscene matter as defined by the California Penal Code Section 311 on the Effective Date;
Holds a person or group of persons up to public ridicule, derision, or embarrassment, or defames a person or group of persons;
Contains language that is obscene, vulgar, profane, or that presents a clear and present danger of causing a riot, disorder, or other imminent threat to public safety, peace or order; or,
Contains advertisements associated with local/state petition driven ballot initiatives or referendums.

A complete list of restricted marketing material can be found in Attachments 3 & 4, Section K.

In addition, the agreements exclude any advertising that promotes “auto malls” or auto dealerships outside of Roseville’s jurisdictional boundary. However, advertising for a specific automobile brand or manufacturer is permitted (i.e. national “brand drives”).

Lastly, the signs will be made available to Caltrans for the purpose of displaying “Amber Alert” messages. The signs will also be made available to Caltrans, the City, and to other government agencies without cost, on a time-available basis (determined by COO), for the purpose of displaying public-service messages, reports of serious accidents, and emergency/disaster communications.

Operating Parameters:

The Subleases specify operating parameters for the billboards including:

No special visual effects that include moving or flashing lights; Messages may not change more than once every eight seconds and have a maximum change interval of two seconds;
In the event of a malfunction, the sign shall be programmed to turn off, show a “full black” image, or freeze the image on the display in one position; and, The billboard shall have a light sensing device that will adjust sign brightness as ambient conditions change. The sign shall not operate at a brightness of more than 0.3 footcandles above ambient light, measured at preset distanced specified in the agreement.

Proposed Digital Billboards - Design and Height:

As proposed, the signs will be approximately 40 to 55 feet tall measured from grade to top of the sign cabinet and dependent upon the locations specific topography and orientation which will be vetted upon approval. The signs would be elevated approximately 45 feet relative to the centerline of I-80 and Hwy-65. The signs would consist of two 672 square foot faces mounted in a “V” configuration oriented toward the eastbound and westbound lanes of I-80 and northbound and southbound lanes of Hwy-65. The design proposes minimal frame treatment to each face in an effort to reduce visual bulk and create a more streamlined appearance. For comprehensive appearance, the signs would be nearly identical to the digital billboard at Golfland Sunsplash with the sign’s supporting structure perpendicular to the ground and horizontally centered. Staff prefers this design, as it provides a cleaner appearance and draws less attention to the sign structure itself. On the support structure would be a smaller illuminated sign identifying the City of Roseville.

The smaller “City of Roseville” sign would be designed to comply with applicable City branding requirements.

Figure C: Elevation:

Conclusion:

As evidenced by the City’s digital billboard at Golfland Sunsplash, CCO has been a committed and responsive partner to the City and community. Approval of the proposed agreements presents a unique opportunity to secure a stable and long-term General Fund revenue source while providing additional opportunities to advertise City sponsored and other non-profit events. As such, staff recommends City Council approve the proposed agreements with COO.

FISCAL IMPACT
Based on the minimum annual guarantee, signing bonus and lease costs, approval of the Ground Leases, and Subleases would guarantee a minimum $14.4 million in General Fund revenue over the 20-year term. Based on a potential revenue share of 45%, it is estimated that the City could receive up to $18.8 million in General Fund revenue over the 20-year term. Additional indirect benefits include dedicated advertising time on each sign for marketing and promotion of City events and programs. With approval of the project CCO will be responsible for all costs related to the construction, operation and maintenance of the digital billboards.

ENVIRONMENTAL REVIEW
Initial Study/Mitigated Negative Declaration (IS/MND) (Attachment 5): In accordance with CEQA, an Initial Study was prepared for the proposed project (Exhibit A). The Initial Study conclusion is that all potential impacts can be mitigated to a less-than-significant level. As such, a Mitigated Negative Declaration is proposed to satisfy CEQA requirements.

Environmental Impact Summary: Impacts are primarily short-term construction related. Mitigation measures were identified for the following environmental issue area:
• Tribal Cultural Resources
All potential impacts can be mitigated to less than significance with application of the recommended measures. The IS conclusion is that with implementation of all mitigation measures identified in the IS/MND, all potential impacts would be reduced to less than significant and an MND is proposed to satisfy CEQA requirements.

Consistent with CEQA Guidelines Section 15097, a Mitigation Monitoring and Reporting Program (MMRP) has been prepared to assist with the tracking and implementation of required mitigation measures (Exhibit B).

The IS/MND was made available for a 30 day public review and comment period from November 19th through December 19, 2021. The environmental document availability was announced: 1) via a letter mailing to surrounding properties; and 2) via a legal notice published in the November 19, 2021 edition of the Sacramento Bee. These notices advised of the IS/MND availability and public comment period. Hard copies of the environmental document were made available at the Permit Center front counter and electronic copies were available via the City’s web site, and the California Office of Planning and Research State Clearinghouse (SCH No. 2021110283).

The City received two comment letters regarding the Initial Study/Mitigated Negative Declaration (Attachment 7). A mitigation measure has been added to the document to address the comments accordingly, and there are no outstanding issues (See MMRP, Attachment 6).

The Initial Study conclusion is that with implementation of all mitigation measures identified in the IS/MND and MMRP, all potential impacts would be reduced to less than significant and an MND is proposed to satisfy CEQA requirements. As such staff recommends adoption of the IS/MND and approval of the Mitigation Monitoring and Reporting Program to satisfy the project’s CEQA requirements.

The Conference Center Drive billboard location was evaluated in the City’s Hotel Conference Center EIR (Attachment 8), certified by City Council on August 6, 2014 (SCH No. 2013112058) (Attachment 8). No additional CEQA review is required.

CITY COUNCIL STRATEGIC PLAN/OVERARCHING GOALS
Goal A: Remain fiscally responsible in a changing world Goal D: Enhance economic vitality
Respectfully Submitted,
Robert Cline, Economic Development Project Manager
Melissa Anguiano, Economic Development Director
_____________________________
Dominick Casey, City Manager
ATTACHMENTS:

Description
Resolution 22-017

5. Roseville Digital Billboard ISMND

6. ISMND Mitigation Monitoring and Reporting Program, Digital Billboard Project Resolution 22-018

1. Ground Lease at 260 S Harding Blvd.

Resolution 22-019

3. Sublease with CCOat 260 S Harding Blvd.

Resolution 22-020

2. Ground Lease at 290 Conference Center Drive
Resolution 22-021

4. Sublease with CCOat 290 Conference Center Drive

7. CEQA Public Comments and Responses

8. Roseville Hotel & Conference Center Project EIR

9. Digital Billboard Site Map

10. Master Score Sheet RFP #04-20

11. Roseville Digital Billboard Project RFP #04-20

12. Roseville Digital Billboard Project IS – Errata
RESOLUTION NO. 22-017

ADOPTING THE INITIAL STUDY/MITIGATED NEGATIVE DECLARATION AND

APPROVING THE MITIGATION MONITORING AND REPORTING PROGRAM FOR THE DIGITAL BILLBOARD SITE AT 260 S. HARDING BOULEVARD
WHEREAS, in April 2020, staff released the Digital Billboard Project Request for Proposals (RFP) and received three proposals; and
WHEREAS, in August 2020, staff rejected all proposals in order to further refine the scope of the Digital Billboard project and obtain direction from City Council; and WHEREAS, in December 2020, staff issued a revised Digital Billboard RFP based on City Council direction; and
WHEREAS, in accordance with California Environmental Quality Act (CEQA), an Initial Study was prepared for the proposed project; and
WHEREAS, the Initial Study/Mitigated Negative Declaration (IS/MND) was made available for a 30 day public review and comment period from November 19, 2021 through December 19, 2021; and
WHEREAS, consistent with CEQA Guidelines Section 15097, a Mitigation Monitoring and Reporting Program (MMRP) has been prepared to assist with the tracking and implementation of required mitigation measures; and
WHEREAS, the Initial Study conclusion is that with implementation of all mitigation measures identified in the IS/MND and MMRP, all potential impacts would be reduced to less than significant and an MND is proposed to satisfy CEQA requirements; and
WHEREAS, staff recommends adoption of the IS/MND and approval of the MMRP to satisfy the project’s CEQA requirements.

NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Roseville that it finds on the basis of the Initial Study/Mitigated Negative Declaration, and the whole record, including public comments and other documents, that if the Roseville Digital Billboard Project is conditioned with mitigation measures as proposed, there is no substantial evidence that the Project will have a significant effect on the environment; the Mitigated Negative Declaration reflects the independent judgment and analysis of the City of Roseville, and the Initial Study/Mitigated Negative Declaration for the Project is hereby adopted.

BE IT FURTHER RESOLVED that the Mitigation Monitoring and Reporting Program for the Roseville Digital Billboard Project is hereby approved.

PASSED AND ADOPTED by the Council of the City of Roseville this day of , 20 , by the following vote on roll call:

AYES COUNCILMEMBERS:

NOES COUNCILMEMBERS:

ABSENT COUNCILMEMBERS:

MAYOR
ATTEST:

City Clerk
Initial Study/Mitigated Negative Declaration
Roseville Digital Billboard Project
Prepared for:

November 2021
Prepared by:
1501 Sports Drive, Suite A, Sacramento, CA 95834
i
Table of Contents
Chapter 1 Introduction and Summary ...................................................................... 1-1

1.1 Introduction................................................................................................. 1-1

1.2 CEQA Lead Agency.................................................................................... 1-1

1.3 Summary .................................................................................................... 1-2 Chapter 2 Project Description................................................................................... 2-1

2.1 Project Background .................................................................................... 2-1

2.2 Project Location and Existing Conditions.................................................... 2-1

2.3 Proposed Project Components ................................................................... 2-1

2.3.1 Construction of the Proposed Billboard....................................................... 2-4

2.3.2 Operations of the Proposed Billboard ......................................................... 2-4

2.4 Best Management Practices (BMPs).......................................................... 2-7

2.4.1 Construction BMPs ..................................................................................... 2-7

2.4.2 City of Roseville Mitigating Ordinances....................................................... 2-9

2.5 Required Entitlements............................................................................... 2-10 Chapter 3 Environmental Checklist.......................................................................... 3-1

3.1 Environmental Factors Potentially Affected ................................................ 3-2

3.2 Determination ............................................................................................. 3-3

3.2.1 Aesthetics ................................................................................................... 3-4

3.2.2 Agricultural and Forestry Resources........................................................... 3-7

3.2.3 Air Quality ................................................................................................... 3-9

3.2.4 Biological Resources ................................................................................ 3-15

3.2.5 Cultural Resources ................................................................................... 3-17

3.2.6 Energy ...................................................................................................... 3-20

3.2.7 Geology and Soils..................................................................................... 3-23

3.2.8 Greenhouse Gas Emissions ..................................................................... 3-26

3.2.9 Hazards and Hazardous Materials............................................................ 3-28

3.2.10 Hydrology and Water Quality .................................................................... 3-31

3.2.11 Land Use and Planning............................................................................. 3-34

3.2.12 Mineral Resources.................................................................................... 3-36

3.2.13 Noise......................................................................................................... 3-37

3.2.14 Population and Housing............................................................................ 3-42

3.2.15 Public Services ......................................................................................... 3-43

3.2.16 Recreation ................................................................................................ 3-45

3.2.17 Transportation........................................................................................... 3-46

3.2.18 Tribal Cultural Resources ......................................................................... 3-48

3.2.19 Utilities and Service Systems.................................................................... 3-52

3.2.20 Wildfire...................................................................................................... 3-54

3.2.21 Mandatory Findings of Significance .......................................................... 3-56 Initial Study/Mitigated Negative Declaration for the
Roseville Digital Billboard Project 1-1 November 2021
Chapter 1
Introduction and Summary

1.1 Introduction
This document is an Initial Study/Mitigated Negative Declaration (IS/MND) that addresses the potential environmental impacts of the Roseville Digital Billboard Project (proposed project) proposed by the City of Roseville (City).

The proposed project would involve the installation of a two-sided electronic billboard at the eastern portion of the project site. The project site is located southwest of the intersection of Interstate 80 (I-80) and Douglas Boulevard, beyond the terminus of South Harding Boulevard, in the City of Roseville, CA. The project site, identified by Assessor’s Parcel Number 014-183- 029, is vacant and covered in dirt and ruderal grasses. The site has been subject to previous disturbance.

The California Environmental Quality Act (CEQA) and Section 15004 of the State CEQA Guidelines encourage early completion of environmental documentation to enable environmental considerations to influence project design. This IS/MND is a public information document that discloses the proposed project’s environmental effects and informs decision makers of the project’s compliance with CEQA and the State CEQA Guidelines.

This document describes the proposed project’s background, project components, the existing environmental setting (conditions before implementation of the project), and the potential environmental impacts of the proposed project. Chapter 2, Project Description, describes the proposed project and the best management practice (BMP) measures that the City has incorporated into the proposed project to avoid and minimize potential effects.

Chapter 3, Environmental Checklist, identifies the anticipated environmental impacts by topic and provides mitigation measures that would be implemented to avoid significant impacts, if warranted.

1.2 CEQA Lead Agency
As the lead agency for the proposed project under CEQA, the City of Roseville determined that preparation of an IS/MND was necessary to evaluate the environmental issues associated with the proposed project and satisfy the requirements of CEQA and the State CEQA Guidelines. The IS/MND is available for public review at the following location:

City of Roseville Permit Center
311 Vernon Street
Roseville, CA 95678
(916) 774-5332
City of Roseville Introduction and Summary
Initial Study/Mitigated Negative Declaration for the
Roseville Digital Billboard Project 1-2 October 2021
Due to changeable circumstances regarding COVID-19 concerns, the Permit Center hours for in person document review may be limited. Therefore, the public is encouraged to check the City’s web site first to ensure in office accommodations are available:
https://www.roseville.ca.us
Alternatively, the IS/MND can also be viewed or downloaded from the City’s website via the following link:
https://www.roseville.ca.us/environmentaldocuments
During the review period, written comments may be submitted via email to:
[email protected], or sent by regular mail to:

Ms. Terri Shirhall, Environmental Coordinator
City of Roseville, Development Services Department
311 Vernon Street
Roseville, CA 95678

1.3 Summary
This IS/MND concludes that the proposed project would have potentially significant but mitigable impacts on cultural resources and tribal cultural resources, as described in Chapter 3, Environmental Checklist. This IS/MND identifies a variety of mitigation measures that the City would implement to avoid or minimize potentially significant impacts on sensitive environmental resources. Implementation of these measures, in addition to project BMPs, would further reduce the potential impacts to a less-than-significant level.

City of Roseville Project Description
Initial Study/Mitigated Negative Declaration for the
Roseville Digital Billboard Project 2-1 November 2021
Chapter 2
Project Description

2.1 Project Background
The City of Roseville proposes to allow the construction of the Roseville Digital Billboard Project (proposed project) in the Infill Planning Area of the City of Roseville, California (Figure 2-1). The proposed project would involve the construction of a two-sided electronic billboard on a vacant parcel southwest of the intersection of Douglas Boulevard and I-80. Prior to 2011, billboard projects, such as the proposed project, were not allowable in the City of Roseville.

However, in 2011, the City adopted the Initial Study/Negative Declaration (2011 Sign Ordinance IS/ND) for the Sign Ordinance Amendment (Ordinance 4986), adding Section

17.17.035, Signs Permissible within City-Owned Property, to the Roseville Municipal Code (RMC), regarding signs on City-owned property. Consequently, the City considers the construction and maintenance of electronic billboards on City-owned property along I-80 and State Route 65 to be an allowable use. Per the Outdoor Advertising Act, enforced and administered by the California Department of Transportation (Caltrans), such electronic billboards shall only be allowed on commercial and industrially zoned property.

2.2 Project Location and Existing Conditions
The project site is located southwest of the intersection of I-80 and Douglas Boulevard, beyond the terminus of South Harding Boulevard, in the City of Roseville, CA. The project site (Figure 2-2), identified by Assessor’s Parcel Number 014-183-029, is vacant and covered in dirt and ruderal grasses. The site has been subject to previous disturbance. The northern portion of the parcel has been used seasonally as a Christmas tree lot and the entire parcel has been used as a construction staging area by Caltrans. Surrounding land uses include single-family residences to the west and southwest, a commercial area to the north, and I-80 and an associated on-ramp to the east and southeast. The project site has a General Plan land use designation of Community Commercial (CC) and is zoned Planned Development (PD192).

2.3 Proposed Project Components
The proposed project consists of the following main components:
 Construction of the proposed two-sided electronic billboard on the southeast portion of the project site; and
 Operation of the proposed billboard.

The specifications of the proposed billboard are described in greater detail below.

City of Roseville Project Description
Initial Study/Mitigated Negative Declaration for the Roseville Digital Billboard Project 2-2 November 2021
Figure 2-1
Regional Project Location
Project Site
City of Roseville Project Description
Initial Study/Mitigated Negative Declaration for the Roseville Digital Billboard Project 2-3 November 2021
Figure 2-2
Project Site
Project Site
Christmas Tree Lot
Commercial Area
Single-Family
Residences
Interstate 80
On-Ramp
City of Roseville Project Description
Initial Study/Mitigated Negative Declaration for the
Roseville Digital Billboard Project 2-4 November 2021

2.3.1 Construction of the Proposed Billboard
The proposed project is installation of a two-sided electronic sign at the eastern portion of the project site. Ground disturbing activities associated with construction of the proposed project would be limited to auger drilling on the southeast portion of the parcel and worker vehicle circulation. Vehicle access to the site is provided by South Harding Boulevard to the north and Wayne Drive to the west. Construction activities would take place between 7:00 AM and 7:00 PM Monday through Friday and between 8:00 AM and 8:00 PM Saturday and Sunday, in compliance with the City’s Noise Ordinance. Construction would occur over approximately two weeks.

2.3.2 Operations of the Proposed Billboard
The proposed project would include operations and maintenance of a two-sided electronic billboard, approximately 35 feet to 50 feet tall, with sign faces approximately 14 feet by 48 feet. The directional light-emitting diodes (LEDs) used on both faces of the proposed sign would have diodes focusing light into a directed beam, with the beams aimed toward the roadway such that vehicular traffic can easily view the advertising message (see Figure 2-3).

The display messages would be visible both from the northbound and southbound lanes of I80 (Figure 2-4 and Figure 2-5). The display faces would be configured in a “V” angle to optimize views from I-80, and would be oriented to face away from the nearest single-family residences.

Figure 2-3
Side View of Billboard Viewing Angles
In addition, horizontal louvers manufactured as part of the sign face would help to prevent upward illumination and nighttime light pollution. Thus, the illuminance of the area around the sign would not be uniform, and greater illuminance would occur from lower viewing angles.

City of Roseville Project Description
Initial Study/Mitigated Negative Declaration for the Roseville Digital Billboard Project 2-5 November 2021
Figure 2-4
View of Proposed Sign from I-80 Travelling North
City of Roseville Project Description
Initial Study/Mitigated Negative Declaration for the Roseville Digital Billboard Project 2-6 November 2021
Figure 2-5
View of Proposed Sign from I-80 Travelling South
City of Roseville Project Description
Initial Study/Mitigated Negative Declaration for the
Roseville Digital Billboard Project 2-7 November 2021
The proposed sign’s illuminance area would be a maximum of 250 feet from the sign during the day and 100 feet at night, when measured perpendicularly from the center of the sign face and assuming the sign is at ground level. However, because the bottom of the sign face would be between approximately 21 feet to 36 feet in the air, the aforementioned distances would be shorter because the illuminance of the sign would be affected both by the horizontal and vertical viewing angles. The proposed sign would be required to comply with the Outdoor Advertising Act regarding flashing signs, which are defined as lights or messages that change more than once every four seconds.

2.4 Best Management Practices (BMPs)
Water quality measures (stormwater management measures and BMPs) would be implemented as part of the project to minimize potential water quality impacts. Key management measures consist of the following:
 Protect areas that provide important water quality benefits or are particularly susceptible to erosion or sediment loss.
 Minimize the potential for erosion by limiting land disturbances such as clearing, grading, and cut and fill.
 Limit disturbance of natural drainage features and vegetation.  Ensure proper storage and disposal of toxic material.  Incorporate pollution prevention into operation and maintenance procedures to reduce pollutant loadings to surface runoff.

2.4.1 Construction BMPs
The City and its contractor shall implement construction BMPs to avoid and minimize impacts on sensitive environmental resources. Implementation of the BMPs discussed below would minimize the potential for construction-related surface water pollution and ensure that water quality in off-site waterways and wetlands would not be compromised by erosion and sedimentation during construction.

Temporary Fencing. Where appropriate, the City’s contractor shall install construction barrier fencing (including sediment fencing and straw wattles) to prevent contaminants and debris from entering off-site surface waters. Before construction begins, the City or its contractor shall identify the locations for the barrier fencing and mark those locations with stakes or flagging.

Equipment. The City shall comply with applicable stormwater ordinances, stormwater management plans, and BMPs to prevent or minimize the potential release of equipmentrelated petroleum contaminants into adjacent surface waters and groundwater.

Implementation of standard construction procedures and precautions for working with petroleum and construction chemicals would further ensure that the impacts related to chemical handling during project construction would be minor.

Hazardous Materials. The City shall implement appropriate hazardous material management practices and other good housekeeping measures to reduce the potential for chemical spills City of Roseville Project Description
Initial Study/Mitigated Negative Declaration for the
Roseville Digital Billboard Project 2-8 November 2021
or releases of contaminants, including any non-stormwater discharge to adjacent surface waters. Implementation of these measures would minimize the potential for surface and groundwater contamination.

Erosion Control. The project design shall incorporate permanent erosion control elements to ensure that stormwater runoff does not cause soil erosion. Erosion and sediment control plans shall comply with the City’s Grading Ordinance, which requires reducing erosion and retaining sediment onsite.

Toxic Materials Control and Spill Response Plan. The following measures shall be incorporated into the plan and implemented to avoid or minimize the risk of spills or discharges of toxic materials into adjacent surface waters:
 Prepare a hazardous material spill prevention, control, and countermeasure plan (SPCC) before construction and implement during construction;
 Prevent raw cement, concrete or concrete washings, asphalt, paint or other coating material, oil or other petroleum products, or any other substances that could be hazardous to aquatic life from contaminating the soil or entering off-site surface waters;  Prevent discharge of drilling mud and fluids into off-site surface waters by using appropriate containment, disposal, and storage methods;  Prevent discharge of turbid water or sediment-laden runoff to off-site surface waters by using sediment filters, diverting the water to a settling tank, and/or implementing other erosion and water quality control BMPs;
 Clean up all spills immediately according to the SPCC;  Provide areas located outside of sensitive environmental areas for staging and storing equipment, materials, fuels, lubricants, solvents, and other possible contaminants; and  Prevent hazardous materials from entering waters. The construction contractor shall notify the City Fire Department if evidence of soil or groundwater contamination is encountered during construction activities. Construction in that area shall be halted until the Fire Department has evaluated the find and remediation is completed, if necessary.

2.4.1.1 Traffic Management Plan
The City shall require the construction contractor to implement a Traffic Management Plan (TMP), including a construction schedule and plan to meet the City’s notice procedures, before construction activities are initiated. This plan shall identify general methods by which construction activities shall be managed to minimize substantial delays to traffic as discussed below.

Communication: Develop and implement a public information campaign that describes the nature and duration of construction activities and when construction related temporary “controlled conditions” and/or travel delays are expected. Particular attention shall be placed on special events (e.g., school graduations or Placer County Fairgrounds events) that may attract unfamiliar users to the City’s roadway system. The City is currently doing public outreach and shall continue the outreach program throughout project design and construction.

Construction: Describe and analyze the number of employees and their site parking areas, and the number of trucks, their routing and staging, and operating hours.

City of Roseville Project Description
Initial Study/Mitigated Negative Declaration for the
Roseville Digital Billboard Project 2-9 November 2021
Wayfinding: Position and operate changeable message sign (CMS) trailers at strategic locations and employ other temporary signage as necessary to advise motorists, pedestrians and bicyclists of pending construction activities and alternate routes.

Emergency Vehicle Response: The contractor shall coordinate with City Police and Fire Departments to ensure that all potential effects of construction traffic controls are clearly communicated understood by public safety providers.

2.4.1.2 Noise Control Measures
The following measures shall be incorporated into the construction specifications for the proposed project to reduce and control noise generated by construction-related activities, consistent with City ordinances and standards:
 Noise-generating construction activities from the City’s construction contractor shall be restricted consistent with the City’s Noise Ordinance (Monday through Friday from 7:00 AM to 7:00 PM, and Saturday and Sunday from 8:00 AM to 8:00 PM);  All construction equipment shall have sound-control devices no less effective than those provided on the original equipment. No equipment shall have an unmuffled exhaust; and  Appropriate additional noise-reducing measures shall be implemented, including the following: stationary construction equipment shall be located as far as possible from sensitive uses; sensitive uses shall be identified on construction drawings; and excessive equipment idling shall be prohibited when the equipment is not in use.

2.4.1.3 Hazards and Hazardous Materials Measures
The construction documents shall identify materials that are considered hazardous. The project contractor shall be required to develop a Health and Safety Plan (prepared by a registered industrial hygienist) that addresses release prevention measures; employee training, notification, and evacuation procedures; and adequate emergency response protocols and cleanup procedures.

The contractor shall comply with the California Occupational Safety and Health Administration standards for the storage and handling of fuels, flammable materials, and common construction-related hazardous materials and for fire prevention (California Labor Code, Division 5, Chapter 2.5).

2.4.2 City of Roseville Mitigating Ordinances
As part of the proposed project, the City shall implement the following regulations and ordinances to reduce potential environmental impacts associated with the project:
 Noise Regulation (RMC Ch.9.24);
 Urban Stormwater Quality Management and Discharge Control Ordinance (RMC Ch.14.20);
 Stormwater Quality Design Manual (Resolution 07-432);  City of Roseville Design and Construction Standards (Resolution 07-137); and City of Roseville Project Description
Initial Study/Mitigated Negative Declaration for the
Roseville Digital Billboard Project 2-10 November 2021
 Community Design Guidelines (Resolution 95-347).

2.5 Required Entitlements
Required permits and approvals are shown in Table 2-2. Local approvals required to construct and operate the proposed project include adoption of the Mitigated Negative Declaration and Mitigation Monitoring and Reporting Plan by the City Council and approval of the project plans and specifications and construction contract. In addition, the proposed construction activities.

No other State or federal approvals are required for the proposed project.

Table 2-2: Permits and Approvals Needed for the Proposed Project Agency Permit/Approval
City of Roseville Adoption of the Mitigated Negative Declaration City of Roseville Approval of the Mitigation Monitoring and Reporting Plan City of Roseville Approval of Plans and Specifications and Construction Contract City of Roseville Environmental Checklist
Initial Study/Mitigated Negative Declaration for the
Roseville Digital Billboard Project 3-1 November 2021
Chapter 3
Environmental Checklist

1. Project Title: Roseville Digital Billboard Project

2. Lead Agency Name and Address: City of Roseville
311 Vernon Street
Roseville, CA 95678

3. Contact Person and Phone Number: Terri Shirhall
Environmental Coordinator
Development Services Department
(916) 774-5362

4. Project Location: The project site, identified by Assessor’s Parcel Number 014-183-029, is located southwest of the intersection of I-80 and Douglas Boulevard, beyond the terminus of
South Harding Boulevard, in the City of Roseville, CA.

The proposed project would be located in the southeast
portion of the parcel.

5. Project Sponsor’s Name and
Address:

City of Roseville
311 Vernon Street
Roseville, CA 95678

6. General Plan Designation: Community Commercial (CC)

7. Zoning: Planned Development (PD192)

8. Description of Project:

The proposed project would include the installation, operation, and maintenance of a two-side electronic sign at the eastern portion of the project site. Ground disturbing activities associated with the construction of the proposed project would be limited to auger drilling on the southeast portion of the parcel and worker vehicle circulation.

9. Surrounding Land Uses and Setting:

The northern portion of the parcel has been used seasonally as a Christmas tree lot and the entire parcel has been used as a construction staging area by the California Department of Transportation (Caltrans). Surrounding land uses include single-family residences to the west and southwest, a commercial area to the north, and I-80 and an associated on-ramp to the east and southeast.

10. Other Public Agencies Whose Approval is Required:

Caltrans.

City of Roseville Environmental Checklist
Initial Study/Mitigated Negative Declaration for the
Roseville Digital Billboard Project 3-2 November 2021

11. Have California Native American tribes traditionally and culturally affiliated with the project area requested consultation pursuant to Public Resources Code section 21080.3.1? If so, has consultation begun?
On October 5, 2021, the City of Roseville sent certified letters to the Tribes listed below requesting consultation and/or information regarding tribal resources in the project area. The letters requested a response within 30 days. The United Auburn Indian Community of the Auburn Rancheria (UAIC) initiated consultation on October 8, 2021, and consultation was closed with mutual agreement on October 22, 2021.
• United Auburn Indian Community of the Auburn Rancheria; and • Shingle Springs Band of Miwok Indians.

3.1 Environmental Factors Potentially Affected
The environmental factors checked below would potentially be affected by this project (i.e., the project would involve at least one impact that is a “Potentially Significant Impact”), as indicated by the checklist on the following pages.

Aesthetics Agricultural and
Forestry
Air Quality Biological Resources
Cultural Resources Geology/Soils Greenhouse Gas
Emissions
Hazards and
Hazardous Materials
Hydrology/Water
Quality
Land Use/Planning Mineral Resources Noise
Population/Housing Public Services Recreation Transportation/Traffic Tribal Cultural
Resources
Utilities/Service
Systems
Mandatory Findings
of Significance
City of Roseville Environmental Checklist

3.2 Determination
On the basis of this initial evaluation:

D I find that the proposed project COULD NOT have a significant effect on the environment, and a NEGATIVE DECLARATION will be prepared.
[gl I find that although the proposed project could have a significant effect on the environment, there will not be a significant effect in this case because revisions to the project have been made by or agreed to by the project proponent. A MITIGATED NEGATIVE DECLARATION will be prepared.

D I find that the proposed project MAY have a significant effect on the environment, and an ENVIRONMENTAL IMPACT REPORT is required.

D I find that the proposed project MAY have an impact on the environment that is "potentially significant" or "potentially significant unless mitigated" but at least one effect (1) has been adequately analyzed in an earlier document pursuant to applicable legal standards and (2) has been addressed by mitigation measures based on the earlier analysis, as described on attached sheets. An ENVIRONMENTAL IMPACT REPORT is required, but it must analyze only the effects that remain to be addressed.

D I find that although the proposed project could have a significant effect on the environment, because all potentially significant effects (a) have been analyzed adequately in an earlier ENVIRONMENTAL IMPACT REPORT or NEGATIVE DECLARATION pursuant to applicable standards, and (b) have been avoided or mitigated pursuant to that earlier ENVIRONMENTAL IMPACT REPORT or NEGATIVE DECLARATION, including revisions or mitigation measures that are imposed upon the project, nothing further is required.

Initial Study/Mitigated Negative Declaration for the
Roseville Digital Billboard Project 3-3
Date
//·ll ·ZI
November 2021
City of Roseville Environmental Checklist
Initial Study/Mitigated Negative Declaration for the
Roseville Digital Billboard Project 3-4 November 2021

3.2.1 Aesthetics
I. Aesthetics
Potentially
Significant
Impact
Less-thanSignificant
with Mitigation
Incorporated
Less-thanSignificant
Impact
No
Impact
Would the project:
a. Have a substantial adverse effect on a
scenic vista?
b. Substantially damage scenic resources,
including, but not limited to, trees, rock
outcroppings, and historic buildings along a
scenic highway?
c. In non-urbanized areas, substantially
degrade the existing visual character or
quality of public views of the site and its
surroundings? (Public views are those that
are experienced from publicly accessible
vantage point). If the project is in an
urbanized area, would the project conflict
with applicable zoning and other regulations
governing scenic quality?
d. Create a new source of substantial light or
glare that would adversely affect daytime or
nighttime views in the area?

3.2.1.1 Discussion
a,b. Examples of typical scenic vistas include mountain ranges, ridgelines, or bodies of water as viewed from a highway, public space, or other area designated for the express purpose of viewing and sightseeing. Per the City’s General Plan EIR, the City’s Panning Area does not contain any scenic vistas or any designated or eligible State scenic highways. Thus, the proposed project would not have a substantial adverse effect on a scenic vista or substantially damage scenic resources, including but not limited to trees, rock outcroppings, and historic buildings within a State scenic highway, and no impact would occur.
c. The project is located in an urbanized area of the City of Roseville; therefore, in accordance with CEQA question ‘c’, the relevant threshold is whether the project would conflict with applicable zoning and other regulations governing scenic quality, rather than whether the project would substantially degrade the existing visual character or quality of public views of the site and its surroundings.

With that said, the visual landscape of the surrounding area is characterized by urban development, with single-family residences to the west and southwest, a commercial area to the north, and I-80 to the east and south. The two proposed display faces would be oriented at a V-angle, facing away from the existing residences. The proposed sign would City of Roseville Environmental Checklist
Initial Study/Mitigated Negative Declaration for the
Roseville Digital Billboard Project 3-5 November 2021
be generally consistent with the existing visual character of public views along the I-80 corridor, including road signs, signs for businesses in the commercial area north of the project site, and other sources of light, including streetlights along I-80.

Per Section 17.17.010(c) of the City’s Sign Ordinance, the regulations and prohibitions in the Sign Ordinance are intended to prevent the visual clutter, blight, and traffic hazards caused by signs. The proposed project’s required compliance with such would ensure that substantial adverse impacts related to aesthetics do not occur. In addition, the proposed project would be required to comply with the Outdoor Advertising Act of the California Business and Professions Code, including, but not limited to, the restrictions on size, height, intermittent flashing lights, proximity to interstate and primary highways and landscaped freeways, and other applicable regulations. For example, signs that are visible from any highway are prohibited from simulating or imitating any directional, warning, danger, or information signs, or from displaying any red, blinking, flashing, moving, or intermittent light likely to be mistaken for a warning or danger signal. Consistent with the regulations, the proposed sign would not include such imagery. Per the Outdoor Advertising Act, the illumination of a sign is considered vision-impairing to travelers on adjacent highways if the brilliance of the proposed sign were to exceed the values set forth in Section 21466.5 of the Vehicle Code. The proposed sign would not exceed an illuminance of 0.3 foot-candles above ambient levels and, thus, would comply with the regulation. Furthermore, advertising displays may not exceed 1,200 square feet in area with a maximum height of 25 feet and a maximum length of 60 feet, including border and trim, and excluding base or apron supports and other structural members. The proposed sign would comply with the size limitations. According to the Outdoor Advertising Act, displays must be located within 660 feet from the edge of the public right-of-way. The proposed sign would be located approximately 60 feet from I-80 and, thus, would comply with the regulation. Thus, the proposed project would be consistent with applicable zoning and other regulations governing electronic billboards in the City of Roseville, including the Sign Ordinance and Outdoor Advertising Act.

Based on the above, implementation of the proposed project would not conflict with the project site’s current land use and zoning designations and other regulations governing scenic quality. As such, the proposed project would not substantially degrade the existing visual character or quality of the site or the surroundings, and a less-than-significant impact would occur.
d. The existing nighttime lighting environment in the project area is defined by light from I-80 and nearby roads, including sources such as street lights, headlights from vehicles, lighted street signs, and traffic signals. The proposed electronic media sign would introduce new sources of light in the project vicinity. The electronic media sign would consist of two display faces oriented at a V-angle, facing away from the existing residences to the southeast of the site. While the proposed sign would be located approximately 100 feet east of the property lines of the nearby single-family residences, the LEDs used on both sign faces would prevent excessive light and glare from reaching the residences by reducing the viewing angle. In addition, the brightness of the sign would be limited to 0.3 foot-candles above ambient levels, which would be ensured by a light-sensing device on the display that would adjust the brightness as ambient light conditions change. The City of Roseville Environmental Checklist
Initial Study/Mitigated Negative Declaration for the
Roseville Digital Billboard Project 3-6 November 2021
photometrics from the manufacturer can be set to consistently meet the brightness targets at day and night.

The proposed sign’s illuminance area would be a maximum of 250 feet from the sign during the day and 100 feet at night, when measured perpendicularly from the center of the sign face and assuming the sign is at ground level. However, because the bottom of the sign face would be between approximately 21 feet to 36 feet in the air, the aforementioned distances would be shorter because the illuminance of the sign would be affected both by the horizontal and vertical viewing angles.

Based on the above, the proposed media sign would be oriented away from existing residences in the project area and the lighting would not exceed 0.3 foot-candles. In addition, the sign would comply with all applicable lighting standards established in the City’s Municipal Code, which would ensure that the proposed sign would comply with the Outdoor Advertising Act and Section 21466.5 of the Vehicle Code. Therefore, the proposed project would result in less-than-significant impacts related to creating a new source of substantial light or glare which would adversely affect day or nighttime views in the area.

3.2.1.2 Mitigation Measures
The proposed project would not result in any potentially significant impacts related to aesthetic resources. Therefore, mitigation measures are not necessary.

3.2.1.3 References
California Legislative Information. Business and Professions Code – BPC, Division 3.

Professions and Vocations Generally [5000 – 9998.11], Chapter 2. Advertisers [5200 -5486], Article 7. Regulations [5400 -5419]. Available at:
https://leginfo.legislature.ca.gov/faces/codes_displayText.xhtml?lawCode=BPC&divi sion=3.&title=&part=&chapter=2.&article=7. Accessed October 2021.

Lou Musica, Clear Channel Outdoor. Best Practices Brief: Digital Viewing Cone Specifics – Vertical and Horizontal v6. July 2020.

City of Roseville Environmental Checklist
Initial Study/Mitigated Negative Declaration for the
Roseville Digital Billboard Project 3-7 November 2021

3.2.2 Agricultural and Forestry Resources
II. Agricultural and Forestry Resources
Potentially
Significant
Impact
Less-thanSignificant
with Mitigation
Incorporated
Less-thanSignificant
Impact
No
Impact
Would the project:
a. Convert Prime Farmland, Unique Farmland,
or Farmland of Statewide Importance
(Farmland), as shown on the maps prepared
pursuant to the Farmland Mapping and
Monitoring Program of the California
Resources Agency, to non-agricultural use?
b. Conflict with existing zoning for agricultural
use or conflict with a Williamson Act
contract?
c. Conflict with existing zoning for, or cause
rezoning of forest land (as defined in Public
Resources Code Section 12220(g)),
timberland (as defined by Public Resources
Code Section 4526), or timberland zoned
Timberland Production (as defined by
Government Code Section 51104(g))?
d. Result in the loss of forest land or conversion
of forest land to non-forest use?
e. Involve other changes in the existing
environment that, due to their location or
nature, could result in conversion of
Farmland to non-agricultural use or
conversion of forest land to non-forest use?

3.2.2.1 Discussion
a-e. The project site currently consists of undeveloped, but disturbed, ruderal grassland.

According to the California Department of Conservation’s Farmland Mapping and Monitoring Program, the project site is designated as “Urban and Built-Up Land” and does not contain any Prime Farmland, Unique Farmland, or Farmland of Statewide Importance.

Thus, the project site would not be converted from Farmland to non-agricultural uses as a result of the proposed project. The project site is currently designated CC per the City’s General Plan and zoned PD192. Consequently, the project site is not zoned for agricultural uses, and the site is not under a Williamson Act Contract. Forest land and timberland do not occur within the City of Roseville. Thus, the project site is not considered forest land (as defined in Public Resources Code section 12220[g]) and is not zoned for Timberland Production (as defined by Government Code Section 51104[g]). Overall, the proposed project would result in no impact to agricultural and forestry resources.

City of Roseville Environmental Checklist
Initial Study/Mitigated Negative Declaration for the
Roseville Digital Billboard Project 3-8 November 2021

3.2.2.2 Mitigation Measures
The proposed project would not result in any potentially significant impacts related to agricultural and forestry resources. Therefore, mitigation measures are not necessary.

3.2.2.3 References
California Department of Conservation. 2016. California Important Farmland Finder.

Available: https://maps.conservation.ca.gov/DLRP/CIFF/. Accessed October 2021.

City of Roseville Environmental Checklist
Initial Study/Mitigated Negative Declaration for the
Roseville Digital Billboard Project 3-9 November 2021

3.2.3 Air Quality
III. Air Quality
Potentially
Significant
Impact
Less than
Significant with
Mitigation
Incorporated
Less-thanSignificant
Impact
No
Impact
When available, the significance criteria
established by the applicable air quality
management or air pollution control district may be
relied upon to make the following determinations.

Would the project:
a. Conflict with or obstruct implementation of the
applicable air quality plan?
b. Cumulatively considerable net increase of any
criteria pollutant for which the project region is a
nonattainment area for an applicable federal or
state ambient air quality standard?
c. Exposure of sensitive receptors to substantial
pollutant concentrations?
d. Other emissions (such as those leading to odors)
adversely affecting a substantial number of
people?

3.2.3.1 Discussion
a,b. The project site is located within the Sacramento Valley Air Basin (SVAB) and is under the jurisdiction of the Placer County Air Pollution Control District (PCAPCD). The SVAB is designated nonattainment for the federal particulate matter 2.5 microns in diameter (PM2.5) and the State particulate matter 10 microns in diameter (PM10) standards, as well as for both the federal and State ozone standards. The federal Clean Air Act requires areas designated as federal nonattainment to prepare an air quality control plan referred to as the State Implementation Plan (SIP). The SIP contains the strategies and control measures for states to use to attain the national ambient air quality standards (NAAQS).

The SIP is periodically modified to reflect the latest emissions inventories, planning documents, rules, and regulations of air basins as reported by the agencies with jurisdiction over them. In compliance with regulations, the PCAPCD periodically prepares and updates air quality plans that provide emission reduction strategies to achieve attainment of the NAAQS, including control strategies to reduce air pollutant emissions via regulations, incentive programs, public education, and partnerships with other agencies.

The current applicable air quality plan for the project area is the Sacramento Regional 2009 NAAQS 8-Hour Ozone Attainment and Reasonable Further Progress Plan (Ozone Attainment Plan), updated July 24, 2017. The Ozone Attainment Plan demonstrates how existing and new control strategies would provide the necessary future emission reductions to meet the Clean Air Act (CAA) requirements, including the federal AAQS.

City of Roseville Environmental Checklist
Initial Study/Mitigated Negative Declaration for the
Roseville Digital Billboard Project 3-10 November 2021
The Ozone Attainment Plan demonstrates how existing and new control strategies would provide the necessary future emission reductions to meet the FCAA requirements, including the NAAQS. It should be noted that in addition to strengthening the 8-hour ozone NAAQS, the USEPA also strengthened the secondary 8-hour ozone NAAQS, making the secondary standard identical to the primary standard. The SVAB remains classified as a severe nonattainment area for ozone with an attainment deadline of 2027. On October 26, 2015, the USEPA released a final implementation rule for the revised NAAQS for ozone to address the requirements for reasonable further progress, modeling and attainment demonstrations, and reasonably available control measures (RACM) and reasonably available control technology (RACT). On April 30, 2018, the USEPA published designations for areas in attainment/unclassifiable for the 2015 ozone standards. The USEPA identified the portions of Placer County within the SVAB as nonattainment for the 2015 ozone standards. Due to the designation of the SVAB as nonattainment for the 2015 standards, the PCAPCD will work with other regional air districts to prepare a new ozone SIP for the revised 2015 standards.

General conformity requirements of the regional air quality plan include whether a project would cause or contribute to new violations of any AAQS, increase the frequency or severity of an existing violation of any AAQS, or delay timely attainment of any AAQS. In order to evaluate ozone and other criteria air pollutant emissions and support attainment goals for those pollutants that the area is designated nonattainment, the PCAPCD has adopted recommended thresholds of significance for emissions of PM10 and the ozone precursors reactive organic gases (ROG) and oxides of nitrogen (NOX). On October 13, 2016, the PCAPCD adopted updated significance thresholds for the aforementioned pollutants.

The significance thresholds, expressed in pounds per day (lbs/day), listed in Table 3.2.3- 1 are the PCAPCD’s current thresholds of significance for use in the evaluation of air quality impacts associated with proposed development projects. Thus, if the proposed project’s emissions exceed the pollutant thresholds presented in Table 3.2.3-1, the project could have a significant effect on air quality, the attainment of federal and State AAQS, and could conflict with or obstruct implementation of the applicable air quality plan.

Table 3.2.3-1. PCAPCD Thresholds of Significance
Pollutant Construction Threshold (lbs/day) Operational Threshold (lbs/day) ROG 82 55
NOX 82 55
PM10 82 82
Source: Placer County Air Pollution Control District. CEQA Handbook. 2017.

Construction activity associated with the proposed project would be limited to relatively minor ground disturbance to construct the proposed sign foundation, minor utility improvements, and installation of the sign column and display screens. Given that such activities would result in relatively insignificant emissions of criteria pollutants, the proposed project is anticipated to be below the PCAPCD thresholds for construction emissions. In addition, the proposed project would not result in any operational emissions.

City of Roseville Environmental Checklist
Initial Study/Mitigated Negative Declaration for the
Roseville Digital Billboard Project 3-11 November 2021
Past, present, and future development projects contribute to the region’s adverse air quality impacts on a cumulative basis. By nature, air pollution is largely a cumulative impact. A single project is not sufficient in size to, by itself, result in nonattainment of AAQS. Because the proposed project would not result in emissions above the applicable thresholds of significance for ROG, NOX, or PM10, the project would not result in a cumulatively considerable net increase of any criteria pollutant for which the project region is nonattainment under an applicable federal or State AAQS.

Because the proposed project would not result in construction-related or operational emissions of criteria air pollutants in excess of PCAPCD’s thresholds of significance, conflicts with or obstruction of the implementation of the applicable regional air quality plans would not occur. In addition, the project would not result in a cumulatively considerable net increase of any criteria pollutant for which the project region is nonattainment under an applicable federal or State AAQS. Thus, a less-than-significant impact would result.
c. Some land uses are considered more sensitive to air pollution than others, due to the types of population groups or activities involved. Heightened sensitivity may be caused by health problems, proximity to the emissions source, and/or duration of exposure to air pollutants. Children, pregnant women, the elderly, and those with existing health problems are especially vulnerable to the effects of air pollution. Sensitive receptors are typically defined as facilities where sensitive receptor population groups (i.e., children, the elderly, the acutely ill, and the chronically ill) are likely to be located. Accordingly, land uses that are typically considered to be sensitive receptors include residences, schools, playgrounds, childcare centers, retirement homes, convalescent homes, hospitals, and medical clinics. The nearest existing sensitive receptor would be the single-family residence located southwest of the project site, approximately 100 feet away.

The major pollutant concentrations of concern are localized carbon monoxide (CO) emissions and toxic air contaminant (TAC) emissions.

Localized Carbon Monoxide Emissions
As discussed in Section 3.2.17, Transportation, of this IS/MND, the proposed project is not anticipated to increase traffic to local roadways except during the construction period.

Increases in vehicle traffic resulting from the proposed project would be minor and would only occur during the installation of the proposed sign. As such, based on the PCAPCD screening criteria, the proposed project would result in a less-than-significant impact related to localized CO emissions concentrations and would not expose sensitive receptors to substantial concentrations of localized CO.

TAC Emissions
Another category of environmental concern is TACs. The CARB’s Air Quality and Land Use Handbook: A Community Health Perspective (Handbook) provides recommended setback distances for sensitive land uses from major sources of TACs, including, but not limited to, freeways and high traffic roads, distribution centers, and rail yards. The CARB has identified diesel particulate matter (DPM) from diesel-fueled engines as a TAC; thus, high volume freeways, stationary diesel engines, and facilities attracting heavy and City of Roseville Environmental Checklist
Initial Study/Mitigated Negative Declaration for the
Roseville Digital Billboard Project 3-12 November 2021
constant diesel vehicle traffic are identified as having the highest associated health risks from DPM. Health risks associated with TACs are a function of both the concentration of emissions and the duration of exposure, where the higher the concentration and/or the longer the period of time that a sensitive receptor is exposed to pollutant concentrations would correlate to a higher health risk.

The proposed project does not include any operations that would be considered a substantial source of TACs. Accordingly, operations of the proposed project would not expose sensitive receptors to excess concentrations of TACs.

Short-term, construction-related activities could result in the generation of TACs, specifically DPM, from on-road haul trucks and off-road equipment exhaust emissions.

Construction is temporary and occurs over a relatively short duration in comparison to the operational lifetime of the proposed project. Health risks are typically associated with exposure to high concentrations of TACs over extended periods of time (e.g., 30 years or greater), whereas the construction period associated with the proposed project would likely be limited to one year. All construction equipment and operation thereof would be regulated per the In-Use Off-Road Diesel Vehicle Regulation, which is intended to help reduce emissions associated with off-road diesel vehicles and equipment, including DPM.

Project construction would also be required to comply with all applicable PCAPCD rules and regulations, particularly associated with permitting of air pollutant sources.

Due to the temporary nature of construction, which would occur over the course of approximately two weeks, and the relatively short duration of potential exposure to associated emissions, the potential for any one sensitive receptor in the area to be exposed to concentrations of pollutants for a substantially extended period of time would be low. Therefore, construction of the proposed project would not be expected to expose nearby sensitive receptors to substantial pollutant concentrations.

Conclusion
Based on the above, the proposed project would not expose any sensitive receptors to substantial concentrations of pollutants, including localized CO or TACs, during construction or operation. Therefore, the proposed project would result in a less-thansignificant impact related to the exposure of sensitive receptors to substantial pollutant concentrations.
d. Emissions of pollutants have the potential to adversely affect sensitive receptors within the project area. Pollutants of principal concern include emissions leading to odors, emissions of dust, or emissions considered to constitute air pollutants. Air pollutants have been discussed in sections “a” through “c” above. Therefore, the following discussion focuses on emissions of odors and dust during construction and operation of the project.

Odors
Odors are generally regarded as an annoyance rather than a health hazard. Due to the subjective nature of odor impacts, the number of variables that can influence the potential for an odor impact, and the variety of odor sources, quantitative methodologies to determine the presence of a significant odor impact do not exist. Certain land uses such City of Roseville Environmental Checklist
Initial Study/Mitigated Negative Declaration for the
Roseville Digital Billboard Project 3-13 November 2021
as wastewater treatment facilities, landfills, confined animal facilities, composting operations, food manufacturing plants, refineries, and chemical plants have the potential to generate considerable odors.

Diesel fumes from construction equipment and heavy-duty trucks could be found to be objectionable; however, as addressed above, operation of construction equipment would be regulated by PCAPCD rules and regulations, restricted to certain hours per the RMC, and would occur intermittently throughout the course of a day. All construction equipment and operation thereof would be regulated per the statewide In-Use Off-Road Diesel Vehicle Regulation. In addition, construction is temporary and construction equipment would operate intermittently throughout the course of a day and would likely only occur over portions of the improvement area at a time. For the aforementioned reasons and due to the distance between the project site and the nearest sensitive receptors, the project would not result in any noticeable objectionable odors associated with construction.

Although offensive odors rarely cause any physical harm, they can be unpleasant, leading to citizen complaints to local governments and air districts. Diesel-powered equipment operating during construction may generate odors that are evident in the immediately surrounding area. These activities would be intermittent and temporary in duration and, therefore, would not result in nuisance odors. Digital billboards are not known to emit odors during operation, and the project does not meet any of the facility types identified by CARB or PCAPCD as odor-generating; thus, the project would not generate substantial operational odors. Accordingly, the proposed project would not create objectionable odors affecting a substantial number of people.

Dust
As noted previously, construction of projects within Placer County are required to comply with all applicable PCAPCD rules and regulations. The aforementioned rules would act to reduce construction-related dust by implementing dust control measures. PCAPCD Rule 228 requires implementation of dust control measures, such as minimizing track-out on to paved public roadways, limiting vehicle travel on unpaved surfaces to 15 miles per hour, and stabilization of storage piles and disturbed areas. Following construction, operation of the proposed sign would not involve vehicles operating within the project site. Thus, the proposed project operations would not include sources of dust that could adversely affect a substantial number of people.

Conclusion
For the aforementioned reasons, construction and operation of the proposed project would not create objectionable odors affecting a substantial number of people, and impacts would be less than significant.

3.2.3.2 Mitigation Measures
Due to the short duration of construction, and minimal ground disturbance, the proposed project would not result in any potentially significant impacts on air quality. Therefore, mitigation measures are not necessary.

City of Roseville Environmental Checklist
Initial Study/Mitigated Negative Declaration for the
Roseville Digital Billboard Project 3-14 November 2021

3.2.3.3 References
California Air Resources Board. Air Quality and Land Use Handbook: A Community Health Perspective. April 2005.

California Air Resources Board. 2020. Area Designations Maps. Available at:
<http://www.arb.ca.gov/desig/adm/adm.htm>. Accessed October 2021.

Placer County Air Pollution Control District. 2017 CEQA Handbook. November 2017.

City of Roseville Environmental Checklist
Initial Study/Mitigated Negative Declaration for the
Roseville Digital Billboard Project 3-15 November 2021

3.2.4 Biological Resources
IV. Biological Resources
Potentially
Significant
Impact
Less-thanSignificant
with Mitigation
Incorporated
Less-thanSignificant
Impact
No
Impact
Would the project:
a. Have a substantial adverse effect, either
directly or through habitat modifications, on
any species identified as a candidate,
sensitive, or special-status species in local or
regional plans, policies, or regulations, or by
the California Department of Fish and Wildlife
or U.S. Fish and Wildlife Service?
b. Have a substantial adverse effect on any
riparian habitat or other sensitive natural
community identified in local or regional
plans, policies, or regulations, or by the
California Department of Fish and Wildlife or
U.S. Fish and Wildlife Service?
c. Have a substantial adverse effect on state or
federally protected wetlands (including, but
not limited to, marsh, vernal pool, coastal,
etc.) through direct removal, filling,
hydrological interruption, or other means?
d. Interfere substantially with the movement of
any native resident or migratory fish or
wildlife species or with established native
resident or migratory wildlife corridors, or
impede the use of native wildlife nursery
sites?
e. Conflict with any local policies or ordinances
protecting biological resources, such as a
tree preservation policy or ordinance
(including essential fish habitat)?
f. Conflict with the provisions of an adopted
habitat conservation plan, natural community
conservation plan, or other approved local,
regional, or state habitat conservation plan?

3.2.4.1 Discussion
a-f. The proposed electronic billboard would be installed within the southeastern portion of the project site, which consists of dirt and ruderal grasses and has been subject to previous disturbance. The project site does not contain riparian habitat or other sensitive natural communities, including wetlands. In addition, the project site does not support any wildlife movement corridors. The project site and the surrounding areas do not contain streams or other waterways that could be used by migratory fish or as a wildlife corridor for other City of Roseville Environmental Checklist
Initial Study/Mitigated Negative Declaration for the
Roseville Digital Billboard Project 3-16 November 2021
wildlife species. No aspect of the project would conflict with the City’s Open Space Preserve Overarching Management Plan, or would otherwise impact habitat areas subject to regulatory oversight.

The project site would not be subject to substantial ground disturbing activity associated with the proposed project. Ground disturbance would be limited to auger drilling for the foundation of proposed sign’s support column and the minor unavoidable disturbance associated with equipment staging. Major grading or material movement would not be required. Furthermore, previous disturbance has occurred on the project site associated with the site’s use as a Christmas tree lot and as a staging area for Caltrans. Due to the disturbed nature of the project site, construction activities associated with the installation of the proposed sign would not result in adverse effects to special status plant and wildlife.

Implementation of the proposed project would not involve the removal of any trees.

A search of the Department of Fish and Wildlife California Natural Diversity Database (CNDDB) revealed that special-status species that exist in the general project region would be unlikely to occur on the project site, and that the proposed project would therefore be highly unlikely to impact any special-status species. Because the project site is not vegetated, heavily disturbed, and does not contain riparian habitat, impacts to special-status plants would not occur or special-status species requiring riparian habitat would not occur. The proposed project would not involve the removal of any trees; thus, special-status birds that nest in trees would not be impacted, such as Swainson’s hawk, purple martin, golden eagle, pallid bat, and white-tailed kite would not occur. While the disturbed dirt field that constitutes the project site could provide habitat for subterranean burrowing species, such as the burrowing owl and American badger, the level of disturbance at the project site from previous use as a Christmas tree lot and equipment staging area for Caltrans create a low likelihood that the project site would provide sufficient habitat.

Given the highly disturbed nature of the project site and the surrounding area, as well as the relatively limited ground disturbance associated with installation of the proposed electronic sign, the project would result in a less-than-significant impact related to biological resources.

3.2.4.2 Mitigation Measures
The proposed project would not result in any potentially significant impacts related to biological resources; therefore, mitigation measures would not be required.

3.2.4.3 References
California Department of Fish and Wildlife. CNDDB Rarefind 5. Available at:
https://wildlife.ca.gov/Data/CNDDB/Maps-and-Data. Accessed October 2021.

Placer County. Placer County Conservation Program. Available at:
https://www.placer.ca.gov/3362/Placer-County-Conservation-Program. Accessed October 2021.

City of Roseville Environmental Checklist
Initial Study/Mitigated Negative Declaration for the
Roseville Digital Billboard Project 3-17 November 2021

3.2.5 Cultural Resources
V. Cultural Resources
Potentially
Significant
Impact
Less-thanSignificant
with Mitigation
Incorporated
Less-thanSignificant
Impact
No
Impact
Would the project:
a. Cause a substantial adverse change in the
significance of a historical resource
pursuant to Section 15064.5?
b. Cause a substantial adverse change in the
significance of an archaeological resource
pursuant to Section 15064.5?
c. Disturb any human remains, including those
interred outside of dedicated cemeteries?

3.2.5.1 Discussion
a-c. Historical resources are features that are associated with the lives of historically important persons and/or historically significant events, that embody the distinctive characteristics of a type, period, region or method of construction, or that have yielded, or may be likely to yield, information important to the pre-history or history of the local area, California, or the nation. Examples of typical historical resources include, but are not limited to, buildings, farmsteads, rail lines, bridges, and trash scatters containing objects such as colored glass and ceramics.

The proposed project would involve the installation of a two-sided electronic billboard that would be visible from I-80. Ground disturbing activities associated with implementation of the proposed project would be limited to auger drilling and construction of the proposed sign column foundation on the southeast portion of the parcel, and worker vehicle circulation. Given that the project site is already highly disturbed, the discovery of previously-unknown historical resources during the limited ground disturbance associated with the proposed project is not anticipated.

A records search for the project site and the surrounding 0.25-mile radius was conducted by staff at the North Central Information Center of the California Historical Resources Information System on September 30, 2021. The records search indicated that four previous cultural resources studies have been conducted within the search area. The records search also identified one previously-recorded historic-period cultural resource within the 0.25-mile radius, consisting of a segment of the California Central Railroad (P31-816).

Furthermore, the Native American Heritage Commission (NAHC) was contacted on September 30, 2021, to request a search of its Sacred Lands File and a list of interested Native American tribes and individuals. The results of the NAHC’s Sacred Lands File search did not indicate the presence of any known cultural resources on the project site.

Assembly Bill (AB 52) tribal consultation efforts under CEQA were carried out by the City City of Roseville Environmental Checklist
Initial Study/Mitigated Negative Declaration for the
Roseville Digital Billboard Project 3-18 November 2021
of Roseville and additional information is provided in Section 3.2.18, Tribal Cultural Resources, of this Environmental Checklist.

Due to previous disturbance of the site and the limited extent of ground disturbance associated with the proposed project, the likelihood of discovering previously unknown historical or archaeological resources and/or human remains is low. However, the possibility exists that ground-disturbing activities during construction may uncover previously unknown subsurface cultural resources; such disturbance would be a potentially significant impact. Mitigation Measures CUL-1 and CUL-2 would reduce this impact to a less-than-significant level.

Based on the above, with implementation of Mitigation Measures CUL-1 and CUL-2, the proposed project would not cause a substantial adverse change in the significance of a historical or archaeological resource pursuant to Section 15064.5, and would not result in the disturbance of human remains; thus, the impact would be considered less than significant with mitigation incorporated.

3.2.5.2 Mitigation Measures
Mitigation Measure CUL-1: Implement Measures to Protect Previously Unidentified Cultural Resources
The City shall ensure that construction specifications include the following information in the grading notes:
 Construction shall stop if potential cultural resources are encountered. It is possible that previous activities have obscured surface evidence of cultural resources. If signs of an archeological site, such as any unusual amounts of stone, bone, or shell, are uncovered during grading or other construction activities, work shall be halted within 100 feet of the find and the City of Roseville will be notified. A qualified archeologist shall be consulted for an onsite evaluation. If the site appears to be eligible for listing in State or federal registers, additional mitigation, such as further testing for evaluation or data recovery, may be necessary.
 In the event resources are discovered, the City shall retain a qualified archaeologist to assess the find and to determine whether the resource requires further study. Any previously undiscovered resources found during construction shall be recorded on appropriate California Department of Parks and Recreation 523 forms and evaluated for significance under all applicable regulatory criteria.  All work shall stop in the immediate vicinity of the find, and, if the find is determined to be an important cultural resource, the City shall make available contingency funding and a time allotment sufficient to allow recovery of an archaeological sample or to implement an avoidance measure. Construction work may continue on other parts of the project while archaeological mitigation takes place.

City of Roseville Environmental Checklist
Initial Study/Mitigated Negative Declaration for the
Roseville Digital Billboard Project 3-19 November 2021
Mitigation Measure CUL-2: Implement Measures if Construction Activities Inadvertently Discover or Disturb Human Remains
The City shall ensure that construction specifications include the following in the grading notes:
 If human remains are discovered during any phase of construction, including disarticulated or cremated remains, the construction contractor shall immediately cease all ground-disturbing activities within 100 feet of the remains and notify the City of Roseville.
 In accordance with California State Health and Safety Code Section 7050.5, no further disturbance shall occur until the following steps have been completed:
 The County Coroner has made the necessary findings as to origin and disposition pursuant to Public Resources Code Section 5097.98.
 If the remains are determined by the County Coroner to be Native American, NAHC will be notified within 24 hours, and the treatment and disposition of the remains will comply with NAHC guidelines.
 It is further recommended that a professional archaeologist with Native American burial experience conduct a field investigation of the specific site and consult with the Most Likely Descendant (MLD), if any, identified by NAHC. As necessary and appropriate, a professional archaeologist may provide technical assistance to the MLD, including excavation and removal of the human remains.

3.2.5.3 References
Native American Heritage Commission. Roseville Digital Billboard Project. November 7, 2021.

North Central Information Center. Records Search Results for Roseville Digital Billboard Project / APN: 014-183-029, NCIC File No.: PLA-21-78. September 30, 2021.

City of Roseville Environmental Checklist
Initial Study/Mitigated Negative Declaration for the
Roseville Digital Billboard Project 3-20 November 2021

3.2.6 Energy
VI. Energy
Potentially
Significant
Impact
Less than
Significant with
Mitigation
Incorporated
Less-thanSignificant
Impact
No
Impact
Would the project:
a. Result in potentially significant environmental
impact due to wasteful, inefficient, or
unnecessary consumption of energy resources,
during project construction or operation?
b. Conflict with or obstruct a state or local plan for
renewable energy or energy efficiency?

3.2.6.1 Discussion
a,b. The main forms of available energy supply are electricity, natural gas, and oil. A description of the 2019 California Green Building Standards Code and the Building Energy Efficiency Standards, with which the proposed project would be required to comply, as well as discussions regarding the proposed project’s potential effects related to energy demand during construction and operations are provided below.

The 2019 California Building Standards Code (CBSC), otherwise known as the CAL Green Code (California Code of Regulations [CCR] Title 24, Part 11), became effective on January 1, 2020. The purpose of the CAL Green Code is to improve public health, safety, and general welfare by enhancing the design and construction of buildings through the use of building concepts having a reduced negative impact or positive environmental impact and encouraging sustainable construction practices. The CBSC standards regulate the method of use, properties, performance, types of materials used in construction, alteration repair, improvement and rehabilitation of a structure or improvement to property.

Construction
Construction of the proposed project would involve on-site energy demand and consumption related to the use of oil in the form of gasoline and diesel fuel for construction worker vehicle trips, and hauling and material delivery truck trips. In addition, diesel-fueled portable generators may be necessary to provide additional electricity demands for temporary on-site lighting, welding, and for supplying energy to areas of the site where energy supply cannot be met via a hookup to the existing electricity grid. Project construction would not involve the use of natural gas appliances or equipment.

Compliance with local, State, and federal regulations, which limit engine idling times and require recycling construction debris, would reduce short-term energy demand during the project’s construction to the extent feasible and project construction would not result in a wasteful or inefficient use of energy.

City of Roseville Environmental Checklist
Initial Study/Mitigated Negative Declaration for the
Roseville Digital Billboard Project 3-21 November 2021
The CARB has prepared the 2017 Climate Change Scoping Plan Update (2017 Scoping Plan), which builds upon previous efforts to reduce GHG emissions and is designed to continue to shift the California economy away from dependence on fossil fuels. Appendix B of the 2017 Scoping Plan includes examples of local actions (municipal code changes, zoning changes, policy directions, and mitigation measures) that would support the State’s climate goals. The examples provided include, but are not limited to, enforcing idling time restrictions for construction vehicles, utilizing existing grid power for electric energy rather than operating temporary gasoline/diesel-powered generators, and increasing use of electric and renewable fuel-powered construction equipment.

Based on the above, the temporary increase in energy use occurring during construction of the proposed project would not result in a significant increase in peak or base demands or require additional capacity from local or regional energy supplies.

Operational
State and local authorities regulate energy use and consumption through various means and programs. Regulations at the State level are intended to reduce energy use and greenhouse gas (GHG) emissions. The proposed project would comply with these regulations that include, among others, AB 1493–Light-duty Vehicle Standards, CCR Title 24, Part 6–Energy Efficiency Standards, and CCR Title 24.

Following implementation of the proposed project, Roseville Electric Utility would provide electricity to the project site. Energy use associated with operation of the proposed project would be typical of electronic signs, requiring electricity lighting, and maintenance of the electronic sign. The proposed media sign would use high-efficiency LEDs for illumination during operation.

Electricity supplied to the project by Roseville Electric Utility would comply with the State’s Renewable Portfolio Standard (RPS), which requires investor-owned utilities, electric service providers, and community choice aggregators to increase procurement from eligible renewable energy resources to 60 percent by 2030. Thus, a portion of the energy consumed during project operations would originate from renewable sources.

Conclusion
Based on the above, construction and operation of the proposed project would not result in wasteful, inefficient, or unnecessary consumption of energy resources or conflict with or obstruct a State or local plan for renewable energy or energy efficiency. Thus, a lessthan-significant impact would occur.

3.2.6.2 Mitigation Measures
The proposed project would not result in any potentially significant impacts related to energy; therefore, mitigation measures would not be required.

City of Roseville Environmental Checklist
Initial Study/Mitigated Negative Declaration for the
Roseville Digital Billboard Project 3-22 November 2021

3.2.6.3 References
California Air Resources Board. 2017 Climate Change Scoping Plan Update. January 20, 2017.

California Building Standards Commission. California Green Building Standards Code. 2019.

City of Roseville Environmental Checklist
Initial Study/Mitigated Negative Declaration for the
Roseville Digital Billboard Project 3-23 November 2021

3.2.7 Geology and Soils
VII. Geology and Soils
Potentially
Significant
Impact
Less-thanSignificant
with Mitigation
Incorporated
Less-thanSignificant
Impact
No
Impact
Would the project:
a. Directly or indirectly cause potential
substantial adverse effects, including the risk
of loss, injury, or death involving:

Rupture of a known earthquake fault, as
delineated on the most recent Alquist-Priolo
Earthquake Fault Zoning Map issued by the
State Geologist for the area or based on
other substantial evidence of a known fault?
Refer to Division of Mines and Geology
Special Publication 42.

Strong seismic ground shaking?
Seismic-related ground failure, including
liquefaction?
Landslides?
b. Result in substantial soil erosion or the loss
of topsoil?
c. Be located on a geologic unit or soil that is
unstable or that would become unstable as a
result of the project and potentially result in
an onsite or offsite landslide, lateral
spreading, subsidence, liquefaction, or
collapse?
d. Be located on expansive soil, as defined in
Table 18-1-B of the Uniform Building Code
(1994), creating substantial direct or indirect
risks to life or property?
e. Have soils incapable of adequately
supporting the use of septic tanks or
alternative wastewater disposal systems in
areas where sewers are not available for the
disposal of wastewater?
f. Directly or indirectly destroy a unique
paleontological resource or site or unique
geologic feature?

3.2.7.1 Discussion
a-d. Per the City of Roseville 2035 General Plan Update EIR, the City is located in an area with relatively low seismic activity, and fault traces are not located either within or immediately adjacent to the City’s Planning Area. The project site is not located within a State- City of Roseville Environmental Checklist
Initial Study/Mitigated Negative Declaration for the
Roseville Digital Billboard Project 3-24 November 2021
designated Alquist-Priolo Fault Zone. The nearest active faults are the Cordelia Fault and Green Valley Fault, located approximately 60 miles southwest of the project site, and the Hunting Creek Fault, located approximately 60 miles west of the project site. Thus, the potential for fault rupture risk at the project site is low.

An earthquake of moderate to high magnitude generated by the above faults could cause considerable ground shaking at the project site. However, the proposed project would be properly engineered in accordance with the CBSC, which includes engineering standards appropriate for the seismic area in which the project site is located. Proper engineering of the proposed project would ensure that the project would not be subject to substantial risks related to seismic ground shaking.

According to the U.S. Department of Agriculture Natural Resource Conservation Service’s Web Soil Survey, soils at the project site have been identified as Cometa-Fiddyment complex. The on-site soils have a low shrink-swell potential of 0.12, and were not determined to have low strength. Thus, the aforementioned soil features do not represent a significant limitation related to the excavation required to construct the foundation for the proposed sign’s support column. Nonetheless, prior to development of the proposed project, a project-specific geotechnical report would be prepared in order to ensure that all geological hazards are adequately addressed. Thus, the aforementioned soil features do not represent a significant limitation on the shallow excavation required to construct the foundation for the proposed sign’s support column.

Liquefaction is a phenomenon in which granular material is transformed from a solid state to a liquefied state as a consequence of increased pore-water pressure and reduced effective stress. Per the Web Soil Survey, Cometa-Fiddyment complex is considered a well-draining soil, and, thus, liquefaction is not anticipated to occur on the project site.

Seismically-induced landslides are triggered by earthquake ground shaking. Lateral spreading and subsidence are also geological hazards of concern; however, the project site is not located near an active fault zone or soils subject to such hazards, and, thus, implementation of the proposed project on the project site would not induce risks associated with liquefaction, landslide, lateral spreading, or subsidence.

In addition, the proposed project would not include any habitable structures. The proposed sign would be between 35 feet and 50 feet tall and would be located greater than 100 feet from the nearest residential fence line; thus, even in the extremely unlikely event that the sign were to fail, the risk of injury or death to humans would not occur.

Based on the above, the proposed project would not be subject to substantial risks related to liquefaction, landslides, lateral spreading, and subsidence/settlement. Compliance with standard construction regulations included in the CBSC would ensure that the proposed project would not directly or indirectly cause potential substantial adverse effects, including the risk of loss, injury, or death involving liquefaction, subsidence, or settlement, and would not be located on a geologic unit or soil that is unstable, or that would become unstable as a result of the project, and potentially result in on- or off-site subsidence, liquefaction, or collapse. Thus, a less-than-significant impact would occur. e. The construction or operation of septic tanks or other alternative wastewater disposal systems is not included as part of the project. Therefore, no impact regarding the City of Roseville Environmental Checklist
Initial Study/Mitigated Negative Declaration for the
Roseville Digital Billboard Project 3-25 November 2021
capability of soil to adequately support the use of septic tanks or alternative wastewater disposal systems would occur.
f. As previously discussed, the project site has already been subject to previous disturbance related to the project site’s use as a Christmas tree lot and a staging area for Caltrans.

Additionally, the project would not result in substantial ground disturbing activities.

Implementation of Mitigation Measure CUL-1 and CUL-2 would ensure that significant impacts do not occur. Therefore, the project would not result in directly or indirectly destroying paleontological resources and a less-than-significant impact would occur.

3.2.7.2 Mitigation Measures
The proposed project would not result in any potentially significant impacts related to geology and soils; therefore, mitigation measures would not be required.

3.2.7.3 References
California Geological Survey. 2019. EQ Zapp: California Earthquake Hazards Zone Application. Available: https://maps.conservation.ca.gov/cgs/EQZApp/app/. Accessed October 2021.

City of Roseville. 2035 General Plan Update Final EIR. August 5, 2020.U.S. Department of Agriculture Natural Resource Conservation Service. Web Soil Survey. Available at:
https://websoilsurvey.nrcs.usda.gov/app/HomePage.htm. Accessed October 2021.

City of Roseville Environmental Checklist
Initial Study/Mitigated Negative Declaration for the
Roseville Digital Billboard Project 3-26 November 2021

3.2.8 Greenhouse Gas Emissions
VIII. Greenhouse Gas Emissions
Potentially
Significant
Impact
Less than
Significant with
Mitigation
Incorporated
Less-thanSignificant
Impact
No
Impact
Would the project:
a. Generate greenhouse gas emissions, either
directly or indirectly, that may have a significant
impact on the environment?
b. Conflict with an applicable plan, policy, or
regulation adopted for the purpose of reducing
the emissions of greenhouse gases?

3.2.8.1 Discussion
a,b. Emissions of GHGs contributing to global climate change are attributable in large part to human activities associated with the industrial/manufacturing, utility, transportation, residential, and agricultural sectors. Therefore, the cumulative global emissions of GHGs contributing to global climate change can be attributed to every nation, region, and city, and virtually every individual on Earth. An individual project’s GHG emissions are at a micro-scale level relative to global emissions and effects to global climate change; however, an individual project could result in a cumulatively considerable incremental contribution to a significant cumulative macro-scale impact. As such, impacts related to emissions of GHG are inherently considered cumulative impacts.

Implementation of the proposed project would cumulatively contribute to increases of GHG emissions. Estimated GHG emissions attributable to future development would be primarily associated with increases of carbon dioxide (CO2) and, to a lesser extent, other GHG pollutants, such as methane (CH4) and nitrous oxide (N2O) associated with area sources, mobile sources or vehicles, and utilities (electricity and natural gas). The primary source of GHG emissions for the project would be mobile source emissions during construction. The common unit of measurement for GHG is expressed in terms of annual metric tons of CO2 equivalents (MTCO2e/yr).

As discussed in Section 3.2.3, Air Quality, the PCAPCD has the primary responsibility for air quality management in Placer County. PCAPCD has adopted a de minimis threshold of 1,100 MTCO2e/yr for operation of land use development projects, such as new residential and commercial projects. The PCAPCD also has a bright line threshold of 10,000 MTCO2e, where land use development projects in excess of the de minimis threshold (1,100 MTCO2e) can be found less than cumulatively considerable if the emission intensity (emissions per capita) meets certain criteria.

It should be noted that construction GHG emissions are a one-time release and are, therefore, not typically expected to generate a significant contribution to global climate change. Construction activities associated with implementation of the proposed project would only include construction of the foundation, assembly of the electronic sign, and City of Roseville Environmental Checklist
Initial Study/Mitigated Negative Declaration for the
Roseville Digital Billboard Project 3-27 November 2021
minor vegetation removal. As a result, because the use of heavy equipment would be limited and the overall construction period would be short in comparison to other development projects in the City, the emissions of construction-related GHG would be less than significant.

During operations, the only GHG emissions associated with the proposed project would be emissions associated with electricity generation necessary to power the proposed electronic displays. The electricity generated by Roseville Electric Utility would comply with the State Renewable Portfolio Standard (RPS) and, thus, would be carbon neutral by the year 2045. In addition, the proposed billboard would not result in a change to regional vehicle miles travelled (VMT). Consequently, operation and maintenance of the proposed project would not result in significant emissions of GHGs.

Based on the above, the proposed project would not be considered to generate GHG emissions, either directly or indirectly, that may have a significant impact on the environment, or conflict with any applicable plan, policy, or regulation adopted for the purpose of reducing the emissions of GHGs. Thus, a less-than-significant impact would occur.

3.2.8.2 Mitigation Measures
The proposed project would not result in significant impacts related to GHG emissions; therefore, mitigation measures would not be required.

3.2.8.3 References
Placer County Air Pollution Control District. 2017 CEQA Handbook. November 2017.

City of Roseville Environmental Checklist
Initial Study/Mitigated Negative Declaration for the
Roseville Digital Billboard Project 3-28 November 2021

3.2.9 Hazards and Hazardous Materials
IX. Hazards and Hazardous Materials
Potentially
Significant
Impact
Less-thanSignificant
with Mitigation
Incorporated
Less-thanSignificant
Impact
No
Impact
Would the project:
a. Create a significant hazard to the public or
the environment through the routine
transport, use, or disposal of hazardous
materials?
b. Create a significant hazard to the public or
the environment through reasonably
foreseeable upset and accident conditions
involving the release of hazardous materials
into the environment?
c. Emit hazardous emissions or handle
hazardous or acutely hazardous materials,
substances, or waste within one-quarter
mile of an existing or proposed school?
d. Be located on a site that is included on a list
of hazardous materials sites compiled
pursuant to Government Code Section
65962.5 and, as a result, would it create a
significant hazard to the public or the
environment?
e. For a project located within an airport land
use plan area or, where such a plan has not
been adopted, be within two miles of a
public airport or public use airport, and result
in a safety hazard or excessive noise for
people residing or working in the project
area?
f. Impair implementation of or physically
interfere with an adopted emergency
response plan or emergency evacuation
plan?
g. Expose people or structures, either directly
or indirectly, to a significant risk of loss,
injury, or death involving wildland fires?

3.2.9.1 Discussion
a,b. During both construction and operations, the proposed electronic sign would not be associated with the routine transport, use, disposal, or generation of substantial amounts of hazardous materials and chemicals that would represent a substantial risk to public health or the environment.

City of Roseville Environmental Checklist
Initial Study/Mitigated Negative Declaration for the
Roseville Digital Billboard Project 3-29 November 2021
Construction activities associated with the proposed project would involve the use of heavy equipment, which would contain fuels and oils, and various other products such as concrete, paints, and adhesives. Small quantities of potentially toxic substances (e.g., petroleum and other chemicals used to operate and maintain construction equipment) would be used at the project site and transported to and from the site during construction.

However, the project contractor would be required to comply with all California Health and Safety Codes and local City ordinances regulating the handling, storage, and transportation of hazardous and toxic materials. Thus, construction of the proposed project would not create a significant hazard to the public or the environment through reasonably foreseeable upset and accident conditions involving the likely release of hazardous materials into the environment.

Based on the above, development of the proposed project would not create a significant hazard to the public or the environment through reasonably foreseeable upset and accident conditions involving the likely release of hazardous materials into the environment, and a less-than-significant impact would occur. c. The closest school to the project site is Warren T. Eich Middle School, located approximately 0.5-mile southeast of the project site. Thus, the project site is not located within a quarter mile of any existing or proposed schools. Therefore, the proposed project would have no impact related to hazardous emissions or the handling of hazardous or acutely hazardous materials, substances, or waste within one-quarter mile of an existing or proposed school.
d. According to the Department of Toxic Substances Control Envirostor Database, the project site is not located on a site that is included on a list of hazardous materials sites compiled pursuant to Government Code Section 65962.5. Thus, the proposed project would not create a significant hazard to the public or the environment related to being located on a site that is included on a list of hazardous materials sites compiled pursuant to Government Code Section 65962.5, and no impact would occur. e. The nearest airport to the project site is the Sacramento McClellan Airport, located approximately 8.5 miles southwest of the project site. Thus, the proposed project site is not located within two miles of any public airports, and does not fall within an airport land use plan area. Therefore, no impact would occur related to the project being located within an airport land use plan or within two miles of a public airport or public use airport, thereby resulting in a safety hazard or excessive noise for people residing or working in the project area.
f. The proposed project would exclusively involve the installation of an electronic billboard and, thus, would not alter the existing circulation system in the surrounding area. As a result, the project would result in no impact with respect to impairing the implementation of or physically interfering with an adopted emergency response plan or emergency evacuation plan.
g. Issues related to wildfire hazards are discussed in Section 3.2.20, Wildfire, of this IS/MND.

As noted therein, the project site is not located within or near a Very High Fire Hazard Severity Zone (VHFHSZ). In addition, the project site is located within a developed area of the City and, thus, is not particularly susceptible to wildland fire.

City of Roseville Environmental Checklist
Initial Study/Mitigated Negative Declaration for the
Roseville Digital Billboard Project 3-30 November 2021
Project construction would involve the use of heavy equipment, welding, and other activities that have the potential to ignite fires. Malfunction of equipment that could cause a fire is extremely unlikely during project construction. However, the contractor would comply with Cal-OSHA standards for the storage and handling of fuels, flammable materials, and common construction-related hazardous materials and for fire prevention.

In addition, the project would meet the minimum standards set forth by Public Resources Code Section 4290, Title 14, for fire protection and emergency water standards.

Compliance with the aforementioned regulations would ensure that the potential for wildland fires is reduced to the maximum extent feasible.

Based on the above, the potential for wildland fires to reach the project site would be limited. Based on the above, the proposed project would not expose people or structures to the risk of loss, injury or death involving wildland fires, and no impact would occur.

3.2.9.2 Mitigation Measures
The proposed project would not result in any potentially significant impacts related to hazards and hazardous materials; therefore, mitigation measures would not be required.

3.2.9.3 References
California Department of Forestry and Fire Protection. Fire Hazard Severity Zone Viewer.

Available at: https://egis.fire.ca.gov/FHSZ/. Accessed October 2021.

California Department of Toxic Substances Control. 2020. Cortese List: Section 65962.5(a). Available at: https://calepa.ca.gov/sitecleanup/corteselist/section-65962- 5a/. Accessed October 2021.

California Department of Toxic Substances Control. 2020. EnviroStor Hazardous Waste and Substance Site List (Cortese). Available at:
https://www.envirostor.dtsc.ca.gov/public/map/?global_id=31400006. Accessed October 2021.

City of Roseville. 2017. Location of Roseville Fire Stations. Roseville, California. Available at: https://www.roseville.ca.us/UserFiles/Servers/Server_7964838/File/Government /Departments/Fire%20Dept/Fire%20Station%20Locations/Location%20of%20Rosevi lle%20Fire%20Stations%20-%202017.pdf. Accessed October 2021.

City of Roseville Environmental Checklist
Initial Study/Mitigated Negative Declaration for the
Roseville Digital Billboard Project 3-31 November 2021

3.2.10 Hydrology and Water Quality
X. Hydrology and Water Quality
Potentially
Significant
Impact
Less-thanSignificant
with Mitigation
Incorporated
Less-thanSignificant
Impact
No
Impact
Would the project:
a. Violate any water quality standards or waste
discharge requirements or otherwise
substantially degrade surface or ground
water quality?
b. Substantially decrease groundwater supplies
or interfere substantially with groundwater
recharge such that the project may impede
sustainable groundwater management of the
basin?
c. Substantially alter the existing drainage
pattern of the site or area, including through
the alteration of the course of a stream or
river or through the addition of impervious
surfaces in a manner which would:
i. result in substantial erosion or siltation on- or
off-site;
ii. substantially increase the rate or amount of
surface runoff in a manner which would result
in flooding on- or offsite;
iii. create or contribute runoff water which would
exceed the capacity of existing or planned
stormwater drainage systems or provide
substantial additional sources of polluted
runoff; or
iv.impede or redirect flood flows?
d. In flood hazard, tsunami, or seiche zones,
risk release of pollutants due to project
inundation?
e. Conflict with or obstruct implementation of a
water quality control plan or sustainable
groundwater management plan?

3.2.10.1 Discussion
a. As noted previously, the project would not include substantial ground disturbing activities.

Ground disturbance associated with the proposed project would be limited to auger drilling and construction of the sign column foundation. The State Water Resources Control Board (SWRCB) regulates stormwater discharges associated with construction activities where clearing, grading, or excavation results in a land disturbance of one or more acres. Given City of Roseville Environmental Checklist
Initial Study/Mitigated Negative Declaration for the
Roseville Digital Billboard Project 3-32 November 2021
that the proposed project would disturb less than one acre of land, the proposed construction activities would not be subject to applicable SWRCB regulations. The ground disturbance associated with the proposed project would be minimal and would occur over a short period of time, and the contractor would be required to comply with the City BMPs listed in Section 2.4 of this document. Thus, the proposed project would not violate any water quality standards or waste discharge requirements or otherwise substantially degrade surface or ground water quality.

Based on the above, the proposed project would not substantially degrade surface water quality or conflict with any applicable water quality control or management plans. Thus, a less-than-significant impact would occur.
b,e. The City of Roseville’s groundwater is derived from the North American Subbasin, which is part of the Sacramento Valley Groundwater Basin. New impervious surfaces created by the project would be limited to a relatively small foundation necessary to support the proposed sign column, and the project would not include any water use. Thus, the project would not interfere substantially with groundwater recharge within the North American Subbasin.

Based on the above, the proposed project would not substantially degrade groundwater quality or substantially interfere with groundwater recharge, and a less-than-significant impact would occur.
ci-iii. The proposed project is not anticipated to create a substantial amount of new impervious surfaces on the project site. The proposed impervious surfaces would be limited to a concrete foundation supporting the proposed sign column. Furthermore, only a small portion of the soil would be exposed during construction of the project and, thus, the project would not result in substantial erosion or siltation.

Consequently, the proposed project would not substantially increase stormwater runoff relative to existing conditions. Due to the minimal amount of impervious surfaces created by the project, the proposed project would result in a less-than-significant impact related to soil erosion, surface runoff, and stormwater drainage. civ. According to the Federal Emergency Management Agency (FEMA) Flood Insurance Rate Map for the project site, the project site is located within an Area of Minimal Flood Hazard (Zone X). The site is not classified as a Special Flood Hazard Area or otherwise located within a 100-year or 500-year floodplain. Therefore, development of the proposed project would not impede or redirect flood flows and no impact would result. d. As discussed under question ‘civ’ above, the project site is not located within a flood hazard zone. Tsunamis are defined as sea waves created by undersea fault movement, whereas a seiche is a long-wavelength, large-scale wave action set up in a closed body of water such as a lake or reservoir. The project site is not located in proximity to a coastline and would not be potentially affected by flooding risks associated with tsunamis.

Seiches do not pose a risk to the proposed project, as the project site is not located adjacent to a large closed body of water. Based on the above, the proposed project would not pose a risk related to the release of pollutants due to project inundation due to flooding, tsunami, or seiche, and no impact would occur.

City of Roseville Environmental Checklist
Initial Study/Mitigated Negative Declaration for the
Roseville Digital Billboard Project 3-33 November 2021

3.2.10.2 Mitigation Measures
The proposed project would not result in any potentially significant impacts related to hydrology and water quality; therefore, mitigation measures would not be required.

3.2.10.3 References
California Department of Water Resources. 2018. DWR Groundwater Basin Boundary Assessment Tool (BBAT). Available at: https://gis.water.ca.gov/app/bbat/. Accessed October 2021.

Federal Emergency Management Agency. 2018. National Flood Hazard Layer (NFHL) Viewer. Map Number 06061C1032H. Available: https://www.fema.gov/floodmaps/national-flood-hazard-layer. Accessed October 2021.

City of Roseville Environmental Checklist
Initial Study/Mitigated Negative Declaration for the
Roseville Digital Billboard Project 3-34 November 2021

3.2.11 Land Use and Planning
XI. Land Use and Planning
Potentially
Significant
Impact
Less-thanSignificant
with Mitigation
Incorporated
Less-thanSignificant
Impact
No
Impact
Would the project:
a. Physically divide an established community?
b. Cause a significant environmental impact
due to a conflict with any land use plan,
policy, or regulation adopted for the purpose
of avoiding or mitigating an environmental
effect?

3.2.11.1 Discussion
a. A project risks dividing an established community if the project would introduce infrastructure or alter land use so as to change the land use conditions in the surrounding community or isolate an existing land use. Existing land uses in the project vicinity include a commercial area to the north, single-family residences to the west, and I-80 to the east and south. The project would not isolate an existing land use. In addition, as noted under question ‘b’ below, the project would be allowable under with the site’s current land use and zoning designations. As such, the proposed project would not physically divide an established community and a less-than-significant impact would occur. b. The project site is currently designated CC per the City of Roseville’s General Plan, and is the site zoned PD192. Title 17.17.035 of the RMC specifies that electronic, digital, programmable, and/or illuminated billboards may be installed within City-owned property and visible from I-80 and/or State Route 65. The proposed project would consist of a twosided electronic billboard visible from I-80; thus, the proposed project would be consistent with Title 17.17.035 of the RMC. Therefore, the project would be consistent with the type and intensity of uses anticipated for the site in the General Plan and generally analyzed in the General Plan EIR. Furthermore, as demonstrated throughout this IS/MND, the proposed project would not conflict with City policies and regulations adopted for the purpose of avoiding or mitigating an environmental effect.

Based on the above, the project would not cause a significant environmental impact due to conflicts with a land use plan, policy, or regulation adopted for the purpose of avoiding or mitigating an environmental effect. Therefore, a less-than-significant impact would occur.

3.2.11.2 Mitigation Measures
The proposed project would not result in any potentially significant impacts related to land use and planning. Therefore, mitigation measures would not be required.

City of Roseville Environmental Checklist
Initial Study/Mitigated Negative Declaration for the
Roseville Digital Billboard Project 3-35 November 2021

3.2.11.3 References
City of Roseville. City of Roseville General Plan 2035. Adopted June 15, 2016. Amended August 17, 2016. Available at:
https://www.roseville.ca.us/cms/One.aspx?portalId=7964922&pageId=8774544.

Accessed October 2021.

City of Roseville. City of Roseville Zoning Map. Adopted July 26, 1996. Last updated:

March 2017. Available at:
https://www.roseville.ca.us/cms/One.aspx?portalId=7964922&pageId=10990649.

Accessed October 2021.

City of Roseville. Roseville Municipal Code Title 17.17.035. Adopted October 15, 2011.

City of Roseville Environmental Checklist
Initial Study/Mitigated Negative Declaration for the
Roseville Digital Billboard Project 3-36 November 2021

3.2.12 Mineral Resources
XII. Mineral Resources
Potentially
Significant
Impact
Less-thanSignificant
with Mitigation
Incorporated
Less-thanSignificant
Impact
No
Impact
Would the project:
a. Result in the loss of availability of a known
mineral resource that would be of value to
the region and the residents of the state?
b. Result in the loss of availability of a locally
important mineral resource recovery site
delineated on a local general plan, specific
plan, or other land use plan?

3.2.12.1 Discussion
a,b. Mineral extraction operations do not exist on or adjacent to the project site. Mineral resources are not evaluated in the City of Roseville 2035 General Plan Update EIR because the City does not designate any territory within the City for Resource extraction and the City does not overlie any known deposits of economically valuable mineral sources. Additionally, the City does not have a Surface Mining and Reclamation Act permit. Because the project site does not contain mineral resources and the construction of the proposed project would not result in the loss of any known mineral resources, no impact to mineral resources would occur.

3.2.12.2 Mitigation Measures
The proposed project would not result in any potentially significant impacts related to mineral resources. Therefore, mitigation measures would not be required.

3.2.12.3 References
City of Roseville. 2035 General Plan Update EIR. August 5, 2020. Available at:
https://www.roseville.ca.us/government/departments/development_services/planning /general_plan_development_guidelines. Accessed October 2021.

City of Roseville. City of Roseville General Plan 2035. Adopted June 15, 2016. Amended August 17, 2016. Available at:
https://www.roseville.ca.us/cms/One.aspx?portalId=7964922&pageId=8774544.

Accessed October 2021.

City of Roseville Environmental Checklist
Initial Study/Mitigated Negative Declaration for the
Roseville Digital Billboard Project 3-37 November 2021

3.2.13 Noise
XIII. Noise
Potentially
Significant
Impact
Less-thanSignificant
with Mitigation
Incorporated
Less-thanSignificant
Impact
No
Impact
Would the project result in:
a. Generation of a substantial temporary or
permanent increase in ambient noise levels
in the vicinity of the project in excess of
standards established in a local general plan
or noise ordinance or applicable standards of
other agencies?
b. Generation of excessive groundborne
vibration or groundborne noise levels?
c. For a project located within the vicinity of a
private airstrip or an airport land use plan or,
where such a plan has not been adopted,
within two miles of a public airport or public
use airport, would the project expose people
residing or working in the project area to
excessive noise levels?

3.2.13.1 Discussion
a. The following sections present information regarding sensitive noise receptors in proximity to the project site, the existing noise environment, and the potential for the proposed project to result in impacts during project construction and operation. The following term is referenced in the sections below:
• Decibel (dB): A unit of sound energy intensity. An A-weighted decibel (dBA) is a decibel corrected for the variation in frequency response to the typical human ear at commonly encountered noise levels. All references to decibels (dB) in this section will be A-weighted unless noted otherwise.

Sensitive Noise Receptors
Some land uses are considered more sensitive to noise than others, and, thus, are referred to as sensitive noise receptors. Land uses often associated with sensitive noise receptors generally include residences, schools, libraries, hospitals, and passive recreational areas. Noise sensitive land uses are typically given special attention in order to achieve protection from excessive noise. In the vicinity of the project site, the nearest existing noise sensitive land use is the single-family residence located approximately 100 feet west of the location within the project site where the proposed billboard would be installed.

City of Roseville Environmental Checklist
Initial Study/Mitigated Negative Declaration for the
Roseville Digital Billboard Project 3-38 November 2021
Existing Noise Environment
The ambient noise environment in the project vicinity is primarily characterized by vehicle traffic on major roadways within the vicinity of the project site, including I-80 and Douglas Boulevard, and, to a lesser extent, by vehicle traffic on smaller local roadways, including Wayne Drive, Marion Avenue, Melrose Avenue, and South Harding Boulevard.

Standards of Significance
Policy N1.9 from the Roseville General Plan Noise Element states that constructionrelated noise that would be consistent with the Roseville Noise Ordinance (RMC, Chapter

9.24, Noise Regulation) would be exempt from the noise standards outlined in the Noise Element Noises resulting from construction activities are prohibited by the RMC, Chapter

9.24, Noise Regulation, during nighttime hours (7:00 PM to 7:00 AM, Monday through Friday, and 8:00 PM to 8:00 AM, Saturday, Sunday and, Holidays). The RMC also specifies that all construction equipment shall be fitted with factory installed muffling devices and that all construction equipment shall be maintained in good working order in order to prevent excessive noise.

Impact Analysis
During construction of the proposed project, heavy equipment would be used for auger drilling and assembly of the proposed sign’s support column, which would result in temporary noise level increases during the construction period. Noise levels would vary depending on the type of equipment used, how the equipment is operated, and how well the equipment is maintained. Table 3.2.13-1 shows maximum noise levels associated with typical construction equipment.

Table 3.2.13-1. Construction Equipment Noise
Type of Equipment Maximum Level, dB at 50 feet
Backhoe 78
Compressor (air) 78
Excavator 81
Generator 81
Pneumatic Tools 85
Source: Federal Highway Administration, Roadway Construction Noise Model User’s Guide, January 2006.

As demonstrated in the table, activities involved in typical construction would generate maximum noise levels up to 85 dB at a distance of 50 feet. Given that the existing singlefamily residences to the west and southwest of the site are located approximately 100 feet from the proposed sign foundation, noise levels would be reduced. At a distance of 100 feet, the maximum noise level at the nearest residence would be approximately 79 dB.

Temporary construction noises are exempt from the City’s noise standards. Nonetheless, pursuant to RMC Chapter 9.24, Noise Regulation, construction would only occur during allowable hours, and all construction equipment would be fitted with muffling devices and maintained in good working order. Compliance with such restrictions would ensure that construction noise associated with the proposed project would be less than significant.

City of Roseville Environmental Checklist
Initial Study/Mitigated Negative Declaration for the
Roseville Digital Billboard Project 3-39 November 2021
Per the 2011 Sign Ordinance IS/ND, electronic billboards are not known to emit noise or sound; thus, operation of the proposed project would not result in increased noise levels.

Conclusion
Based on the above, project construction noise would not conflict with the City’s General Plan if restricted to the hourly limits established by the City’s Noise Ordinance. In addition, the proposed project would not generate any noise level increases during operation.

Therefore, the proposed project would not result in a temporary exceedance of the standards established in the local general plan or noise ordinance, or applicable standards of other agencies, and a less-than-significant impact would occur. b. Similar to noise, vibration involves a source, a transmission path, and a receiver. However, noise is generally considered to be pressure waves transmitted through air, whereas vibration usually consists of the excitation of a structure or surface. As with noise, vibration consists of an amplitude and frequency. A person’s perception of the vibration depends on their individual sensitivity to vibration, as well as the amplitude and frequency of the source and the response of the system which is vibrating.

Vibration is measured in terms of acceleration velocity, or displacement. A common practice is to monitor vibration in terms of peak particle velocities (PPV) in inches per second (in/sec). Standards pertaining to perception as well as damage to structures have been developed for vibration levels defined in terms of PPV. Human and structural response to different vibration levels is influenced by a number of factors, including ground type, distance between source and receptor, duration, and the number of perceived vibration events.

Table 3.2.13-2, which was developed by Caltrans, shows the vibration levels that would normally be required to result in damage to structures. As presented in the table, the threshold for architectural damage to structures is 0.20 in/sec PPV and continuous vibrations of 0.10 in/sec PPV, or greater, would likely cause annoyance to sensitive receptors.

The only vibration-generating activities associated with the proposed project would occur during construction activities. Table 3.2.13-3 shows the typical vibration levels produced by construction equipment at various distances. The most substantial source of groundborne vibrations associated with project construction would likely be the use of auger/drill rigs. At a distance of 25 feet or greater, vibration levels from such equipment would be below the 0.20 in/sec threshold recommended by Caltrans.

The proposed construction activities would occur at a distance of over 100 feet from the existing single-family residences to the west and southwest of the site. Therefore, per the vibration levels shown in Table 3.2.13-3, groundborne vibrations would be below the 0.20 in/sec PPV threshold established by Caltrans for architectural damage to buildings.

Additionally, construction activities would be temporary in nature and are anticipated to occur during normal daytime working hours.

City of Roseville Environmental Checklist
Initial Study/Mitigated Negative Declaration for the
Roseville Digital Billboard Project 3-40 November 2021
Table 3.2.13-2. Effects of Vibration on People and Buildings PPV
mm/sec in/sec Human Reaction Effect on Buildings

0.15 to

0.30 0.006 to

0.019
Threshold of perception;
possibility of intrusion
Vibrations unlikely to cause damage
of any type

2.0 0.08 Vibrations readily perceptible
Recommended upper level of the
vibration to which ruins and ancient
monuments should be subjected

2.5 0.10
Level at which continuous
vibrations begin to annoy
people
Virtually no risk of “architectural”
damage to normal buildings

5.0 0.20
Vibrations annoying to people
in buildings (this agrees with
the levels established for
people standing on bridges and
subjected to relative short
periods of vibrations)
Threshold at which there is a risk of
“architectural” damage to normal
dwelling - houses with plastered
walls and ceilings. Special types of
finish such as lining of walls, flexible
ceiling treatment, etc., would
minimize “architectural” damage
10 to 15 0.4 to 0.6
Vibrations considered
unpleasant by people subjected
to continuous vibrations and
unacceptable to some people
walking on bridges
Vibrations at a greater level than
normally expected from traffic, but
would cause “architectural” damage
and possibly minor structural
damage
Source: Caltrans. Transportation Related Earthborne Vibrations. TAV-02-01-R9601.

February 20, 2002.

Table 3.2.13-3 Vibration Levels for Various Construction Equipment Type of Equipment PPV at 25 feet (in/sec) PPV at 50 feet (in/sec) Loaded Trucks 0.076 0.025
Small Bulldozer 0.003 0.000
Auger/drill Rigs 0.089 0.029
Source: Federal Transit Administration, Transit Noise and Vibration Impact Assessment Guidelines, May 2006.

The proposed project would only cause elevated vibration levels during construction, as the proposed project would not involve any uses or operations that would generate substantial groundborne vibration.

Based on the above, the proposed project would not expose people to or generate excessive groundborne vibration or groundborne noise levels, and a less-thansignificant impact would occur. c. The nearest airport to the project site is the Sacramento McClellan Airport, located approximately 8.5 miles southwest of the project site. Thus, the project site is not located within two miles of any public airports, and does not fall within an airport land use plan area. Therefore, no impact would occur related to the project being located within an airport land use plan or within two miles of a public airport or public use airport, thereby resulting in a safety hazard or excessive noise for people residing or working in the project area.

City of Roseville Environmental Checklist
Initial Study/Mitigated Negative Declaration for the
Roseville Digital Billboard Project 3-41 November 2021

3.2.13.2 Mitigation Measures
The proposed project would not result in any potentially significant impacts related to noise. Therefore, mitigation would not be required.

3.2.13.3 References
City of Roseville. General Plan Noise Element. Available at:
https://p1cdn4static.civiclive.com/UserFiles/Servers/Server_7964838/File/Governme nt/Departments/Development%20Services/Planning/General%20Plan/Final%20Gen eral%20Plan%202020/09%20Noise_Final.pdf. Accessed October 2021.

City of Roseville. Roseville Municipal Code Chapter 9.24 Noise Regulation. Available at:
https://qcode.us/codes/roseville/. Accessed October 2021.

City of Roseville Environmental Checklist
Initial Study/Mitigated Negative Declaration for the
Roseville Digital Billboard Project 3-42 November 2021

3.2.14 Population and Housing
XIV. Population and Housing
Potentially
Significant
Impact
Less-thanSignificant
with Mitigation
Incorporated
Less-thanSignificant
Impact
No
Impact
Would the project:
a. Induce substantial unplanned population
growth in an area, either directly (e.g., by
proposing new homes and businesses) or
indirectly (e.g., through extension of roads or
other infrastructure)?
b. Displace a substantial number of existing
people or housing, necessitating the
construction of replacement housing
elsewhere?

3.2.14.1 Setting
a,b. The proposed project would include the construction of an electronic media sign. The project site is located in a developed area and would not include the extension of major infrastructure. Given the nature of the proposed project, the project would not create a large number of jobs or result in an influx of new residents to the project area. In addition, the proposed project would not include the construction of new housing or the demolition of existing residences. Therefore, the project would not result in substantial unplanned population growth or the displacement of existing people or housing, and no impact would occur.

3.2.14.2 Mitigation Measures
The proposed project would not result in any potentially significant impacts related to population and housing. Therefore, mitigation would not be required.

3.2.14.3 References
None.

City of Roseville Environmental Checklist
Initial Study/Mitigated Negative Declaration for the
Roseville Digital Billboard Project 3-43 November 2021

3.2.15 Public Services
XV. Public Services
Potentially
Significant
Impact
Less-thanSignificant
with Mitigation
Incorporated
Less-thanSignificant
Impact
No
Impact
Would the project:
a. Result in substantial adverse physical
impacts associated with the provision of new
or physically altered governmental facilities or
a need for new or physically altered
governmental facilities, the construction of
which could cause significant environmental
impacts, in order to maintain acceptable
service ratios, response times, or other
performance objectives for any of the
following public services:

Fire protection?
Police protection?
Schools?
Parks?
Other public facilities?

3.2.15.1 Discussion
a. The Roseville Fire Department operates nine fire stations that provide fire protection, suppression, emergency medical services, and hazardous material management within the City of Roseville, including the project site. The closest station is located approximately

0.7 miles northwest of the project site (Fire Station No. 1). The Roseville Police Department, headquartered approximately 1.75 miles northwest of the project site at 1051 Junction Boulevard, provides police protection services throughout the City. Because the proposed project would not add any additional residents to the area, an increase in demand for fire and police services would not occur.

The project site is located within the Roseville City School District. Because the proposed project would not result in population growth in the area, implementation of the project would not generate additional demand for school facilities.

The nearest existing park to the project site is Garbolino Park, located approximately 900 feet west of the project site. Because the proposed project would not result in population growth in the area, additional demand for parks would not occur.

Based on the above, the proposed project would result in no impact relating to the provision of public services, including fire and police protection, schools, parks, and other public facilities.

City of Roseville Environmental Checklist
Initial Study/Mitigated Negative Declaration for the
Roseville Digital Billboard Project 3-44 November 2021

3.2.15.2 Mitigation Measures
The proposed project would not result in any potentially significant impacts related to the provision of public services. Therefore, mitigation would not be required.

3.2.15.3 References
City of Roseville. 2017. Location of Roseville Fire Stations. Roseville, California. Available at:
https://www.roseville.ca.us/UserFiles/Servers/Server_7964838/File/Government/Dep artments/Fire%20Dept/Fire%20Station%20Locations/Location%20of%20Roseville% 20Fire%20Stations%20-%202017.pdf. Accessed October 2021.

City of Roseville Environmental Checklist
Initial Study/Mitigated Negative Declaration for the
Roseville Digital Billboard Project 3-45 November 2021

3.2.16 Recreation
XVI. Recreation
Potentially
Significant
Impact
Less-thanSignificant
with Mitigation
Incorporated
Less-thanSignificant
Impact
No
Impact
Would the project:
a. Increase the use of existing neighborhood
and regional parks or other recreational
facilities such that substantial physical
deterioration of the facility would occur or be
accelerated?
b. Include recreational facilities or require the
construction or expansion of recreational
facilities that might have an adverse physical
effect on the environment?

3.2.16.1 Discussion
a,b. The proposed project would include the development of a two-sided electronic media sign on a site that is currently designated for uses which are commercial in nature. The proposed project would not result in any population growth that could result in increased use of existing recreational facilities, nor would the proposed project include or require construction or expansion of existing recreational facilities. Thus, no impact would occur.

3.2.16.2 Mitigation Measures
The proposed project would not result in any potentially significant impacts related to recreational facilities. Therefore, mitigation would not be required.

3.2.16.3 References
None.

City of Roseville Environmental Checklist
Initial Study/Mitigated Negative Declaration for the
Roseville Digital Billboard Project 3-46 November 2021

3.2.17 Transportation
XVII. Transportation
Potentially
Significant
Impact
Less-thanSignificant
with Mitigation
Incorporated
Less-thanSignificant
Impact
No
Impact
Would the project:
a. Conflict with a program, plan, ordinance, or
policy addressing the circulation system
including transit, roadway, bicycle and
pedestrian facilities?
b. Would the project conflict or be inconsistent
with CEQA Guidelines Section 15064.3,
subdivision (b)?
c. Substantially increase hazards due to a
geometric design feature (e.g., sharp curves
or dangerous intersections) or incompatible
uses (e.g., farm equipment)?
d. Result in inadequate emergency access?

3.2.17.1 Discussion
a-d. During construction, the proposed project would generate a minor amount of traffic on local roadways associated with construction worker commutes and the transport of materials for the proposed sign. However, such construction traffic would be limited, and would be temporary in nature. The proposed project would not include construction of new roadways or extension of existing roadways. In addition, the proposed project would not include development which would alter or increase demand for transit, bicycle, or pedestrian facilities. While the proposed project would temporarily result in an increase in VMT during the construction period, operation and maintenance of the proposed project would not affect local or regional VMT. Thus, impacts relating to VMT would be less than significant, and the project would not conflict with a program, plan, ordinance, or policy addressing the circulation system, including transit, roadway, bicycle, and pedestrian facilities or with CEQA Guidelines section 15064.3, subdivision (b). Furthermore, because the project would not alter the existing circulation network, the project would not substantially increase hazards due to a geometric design feature or incompatible uses or result in inadequate emergency access.

Based on the above, the proposed project would result in a less-than-significant impact related to transportation.

3.2.17.2 Mitigation Measures
The proposed project would not result in any potentially significant impacts related to transportation. Therefore, mitigation would not be required.

City of Roseville Environmental Checklist
Initial Study/Mitigated Negative Declaration for the
Roseville Digital Billboard Project 3-47 November 2021

3.2.17.3 References
None.

City of Roseville Environmental Checklist
Initial Study/Mitigated Negative Declaration for the
Roseville Digital Billboard Project 3-48 November 2021

3.2.18 Tribal Cultural Resources
XVIII. Tribal Cultural Resources
Potentially
Significant
Impact
Less-thanSignificant
with Mitigation
Incorporated
Less-thanSignificant
Impact
No
Impact
Would the project cause a substantial adverse
change in the significance of a tribal cultural
resource, defined in Public Resources Code
Section 21074 as either a site, feature, place,
cultural landscape that is geographically
defined in terms of the size and scope of the
landscape, sacred place, or object with cultural
value to a California Native American tribe, and
that is:
a. Listed or eligible for listing in the California
Register of Historical Resources, or in a local
register of historical resources as defined in
Public Resources Code section 5020.1(k), or
b. A resource determined by the lead agency, in
its discretion and supported by substantial
evidence, to be significant pursuant to criteria
set forth in subdivision (c) of Public
Resources Code Section 5024.1. In applying
the criteria set forth in subdivision (c) of
Public Resource Code Section 5024.1, the
lead agency shall consider the significance of
the resource to a California Native American
tribe.

3.2.18.1 Discussion
a,b. The project site has already been subject to previous disturbance associated with the Christmas tree business located on the northern portion of the project site. Additionally, the project would not involve substantial ground disturbing activities. Based on the history of disturbance at the project site, tribal cultural resources are not expected to occur within the project site.

A search of the NAHC’s Sacred Lands File was conducted, and did not indicate the presence of any known cultural resources on the project site. In compliance with AB 52 (Public Resources Code Section 21080.3.1), the City distributed project notification letters to the appropriate Tribes on October 5, 2021. The United Auburn Indian Community indicated that the project site is located between two areas that are considered sensitive, and the potential exists for buried tribal cultural sites or items to be present on-site. The City of Roseville began formal consultation with the United Auburn Indian Community on October 8, 2021. Consultation was concluded on October 22, 2021, with mutual agreement based on the identified mitigation measures.

City of Roseville Environmental Checklist
Initial Study/Mitigated Negative Declaration for the
Roseville Digital Billboard Project 3-49 November 2021
Based on the above, although not anticipated, the potential exists that previously unknown subsurface tribal cultural resources could be present on the project site. Should buried or otherwise unknown tribal cultural resources be encountered and/or damaged during construction, a potentially significant impact would occur. However, implementation of Mitigation Measures TCR-1 and TCR-2 would reduce the potential impact to less than significant with mitigation incorporated.

3.2.18.2 Mitigation Measures
Mitigation Measure TCR-1: Implement Measures to Protect Unanticipated Discoveries.

If subsurface deposits believed to be cultural or human in origin, or tribal cultural resources, are discovered during construction, all work shall halt within a 100-foot radius of the discovery, and the Construction Manager shall immediately notify the City of Roseville Development Services Director by phone. The Construction Manager shall also immediately coordinate with the monitoring archeologist or project archaeologist and tribal monitor (if present), or, in the absence of either, contact consulting tribe(s) and a qualified professional archaeologist, meeting the Secretary of the Interior’s Professional Qualification Standards for archaeology and subject to approval by the City, to evaluate the significance of the find and develop appropriate management recommendations, in coordination with the consulting tribe(s) if the find is a tribal cultural resource.

All management recommendations shall be provided to the City in writing for the City’s review and approval. If recommended by the qualified professional archeologist, and consulting tribe(s), and approved by the City, this may include modification of the no-work radius.

The professional archaeologist must make a determination, based on professional judgement and supported by substantial evidence, within one business day of being notified, as to whether or not the find represents a cultural or tribal cultural resource or has the potential to be a cultural or tribal cultural resource. The consulting tribe shall also be provided the opportunity to determine, within one business day of being notified, whether or not the find represents a tribal cultural resource or has the potential to be a tribal cultural resource. The subsequent actions will be determined by the type of discovery, as described below. These include: 1) a work pause that, upon further investigation, is not actually a discovery and the work pause was simply needed in order to allow for closer examination of soil (a “false alarm”); 2) a work pause and subsequent action for discoveries that are clearly not related to tribal resources, such as can and bottle dumps, artifacts of European origin, and remnants of built environment features; and 3) a work pause and subsequent action for discoveries that are likely related to tribal resources, such as midden soil, bedrock mortars, groundstone, or other similar expressions.

Whenever there is question as to whether or not the discovery represents a tribal resource, culturally affiliated tribes shall be consulted in making the determination. Whenever a tribal monitor is present, the monitor shall be consulted.

City of Roseville Environmental Checklist
Initial Study/Mitigated Negative Declaration for the
Roseville Digital Billboard Project 3-50 November 2021
The following processes shall apply, depending on the nature of the find, subject to the review and approval of the City:
• Response to False Alarms: If the professional archaeologist determines that the find is negative for any cultural indicators and tribal representatives have not indicated the find is a tribal cultural resource, then work may resume immediately upon notice to proceed from the City’s representative. No further notifications or archaeological consultation is necessary if it is determined that the discovery is not a cultural or tribal cultural resource of any kind. The professional archaeologist shall provide written documentation of this finding to the City, which shall include as an attachment any written documentation provided by tribal representatives or monitors. • Response to Non-Tribal Discoveries: If a tribal monitor is not present at the time of discovery and a professional archaeologist determines that the find represents a nontribal cultural resource from any time period or cultural affiliation, the City shall be notified immediately, to consult on a finding of eligibility and implementation of appropriate treatment measures, if the find is determined to be a Historical Resource under CEQA, as defined in Section 15064.5(a) of the CEQA Guidelines. The professional archaeologist shall provide a photograph of the find and a written description to the City of Roseville. The City of Roseville will notify any [tribe(s)] who, in writing, requested notice of unanticipated discovery of non-tribal resources. Notice shall include the photograph and description of the find, and a tribal representative shall have the opportunity to determine whether or not the find represents a tribal cultural resource. If a response is not received within 24 hours of notification (none of which time period may fall on weekends or City holidays), the City will deem this portion of the measure completed in good faith as long as the notification was made and documented. If requested by a [tribe(s)], the City may extend this timeframe, which shall be documented in writing (electronic communication may be used to satisfy this measure). If a notified tribe responds within 24 hours to indicate that the find represents a tribal cultural resource, then the Response to Tribal Discoveries portion of this measure applies. If the tribe does not respond or concurs that the discovery is non-tribal, work shall not resume within the no-work radius until the City, through consultation as appropriate, determines that the site either: 1) is not a Historical Resource under CEQA, as defined in Section 15064.5(a) of the CEQA Guidelines; or 2) that the treatment measures have been completed to its satisfaction. • Response to Tribal Discoveries: If the find represents a tribal or potentially tribal cultural resource that does not include human remains, the consulting tribe(s) and City shall be notified. The City will consult with the tribe(s) on a finding of eligibility and implement appropriate treatment measures, if the find is determined to be either a Historical Resource under CEQA, as defined in Section 15064.5(a) of the CEQA Guidelines, or a Tribal Cultural Resource, as defined in Section 21074 of the Public Resources Code. Preservation in place is the preferred treatment, if feasible. Work shall not resume within the no-work radius until the City, through consultation as appropriate, determines that the site either: 1) is not a Historical Resource under CEQA, as defined in Section 15064.5(a) of the CEQA Guidelines; or 2) not a Tribal City of Roseville Environmental Checklist
Initial Study/Mitigated Negative Declaration for the
Roseville Digital Billboard Project 3-51 November 2021
Cultural Resource, as defined in Section 21074 of the Public Resources Code; or 3) that the treatment measures have been completed to its satisfaction. • Response to Human Remains: If the find includes human remains, or remains that are potentially human, the construction supervisor or on-site archaeologist and (if present) tribal monitor shall ensure reasonable protection measures are taken to protect the discovery from disturbance (AB 2641) and shall notify the City and Placer County Coroner (per § 7050.5 of the Health and Safety Code). The provisions of § 7050.5 of the California Health and Safety Code, § 5097.98 of the California Public Resources Code, and Assembly Bill 2641 shall be implemented. If the Coroner determines the remains are Native American and not the result of a crime scene, the Coroner will notify the Native American Heritage Commission (NAHC), which then will designate a Native American Most Likely Descendant (MLD) for the project (§ 5097.98 of the Public Resources Code). The designated MLD will have 48 hours from the time access to the property is granted to make recommendations concerning treatment of the remains.

Public Resources Code § 5097.94 provides structure for mediation through the NAHC if necessary. If the landowner does not agree with the recommendations of the MLD, the NAHC can mediate (§ 5097.94 of the Public Resources Code).

If no agreement is reached, the landowner must rebury the remains in a respectful manner where they will not be further disturbed (§ 5097.98 of the Public Resources Code). This will also include either recording the site with the NAHC or the appropriate Information Center; using an open space or conservation zoning designation or easement; or recording a reinternment document with the county in which the property is located (AB 2641). Work shall not resume within the no-work radius until the City, through consultation as appropriate, determines that the treatment measures have been completed to its satisfaction.

3.2.18.3 References
Native American Heritage Commission. Roseville Digital Billboard Project. November 7, 2021.

North Central Information Center. Records Search Results for Roseville Digital Billboard Project / APN: 014-183-029, NCIC File No.: PLA-21-78. September 30, 2021.

City of Roseville Environmental Checklist
Initial Study/Mitigated Negative Declaration for the
Roseville Digital Billboard Project 3-52 November 2021

3.2.19 Utilities and Service Systems
XIX. Utilities and Service Systems
Potentially
Significant
Impact
Less-thanSignificant
with Mitigation
Incorporated
Less-thanSignificant
Impact
No
Impact
Would the project:
a. Require or result in the relocation or
construction of new or expanded water,
wastewater treatment, stormwater drainage,
electric power, natural gas, or
telecommunications facilities, the
construction or relocation of which could
cause significant environmental effects?
b. Have sufficient water supplies available to
serve the project and reasonably
foreseeable future development during
normal, dry, and multiple dry years?
c. Result in a determination by the wastewater
treatment provider that serves or may serve
the project that it has adequate capacity to
serve the project’s projected demand in
addition to the provider’s existing
commitments?
d. Generate solid waste in excess of state or
local standards, or in excess of the capacity
of local infrastructure, or otherwise impair
the attainment of solid waste reduction
goals?
e. Comply with federal, state, and local
management and reduction statutes and
regulations related to solid waste?

3.2.19.1 Discussion
a-e. Electricity for the proposed project would be provided by a new connection to an existing transformer. Water, wastewater, storm drainage infrastructure would not be impacted by the proposed project, as the project would not require connections to such utility features.

While construction of the proposed project could generate a small amount of solid waste, the waste could be accommodated by the existing landfill facilities serving the City.

Operation of the proposed project would not require solid waste or landfill services.

Overall, the proposed project would not require the relocation or construction of new or expanded utilities.

Given that the proposed project is consistent with the site’s current General Plan land use and zoning designations, the utility infrastructure within the project vicinity has been designed with adequate capacity to accommodate the minor increase in electricity City of Roseville Environmental Checklist
Initial Study/Mitigated Negative Declaration for the
Roseville Digital Billboard Project 3-53 November 2021
demand from development of the proposed electronic media sign, as well as other existing and planned uses in the project area. Therefore, the project would result in a less-thansignificant impact related to utilities and service systems.

3.2.19.2 Mitigation Measures
The proposed project would not result in any potentially significant impacts related to utilities and service systems. Therefore, mitigation would not be required.

3.2.19.3 References
None.

City of Roseville Environmental Checklist
Initial Study/Mitigated Negative Declaration for the
Roseville Digital Billboard Project 3-54 November 2021

3.2.20 Wildfire
XX. Wildfire
Potentially
Significant
Impact
Less-thanSignificant
with Mitigation
Incorporated
Less-thanSignificant
Impact
No
Impact
If located in or near state responsibility areas or
lands classified as very high fire hazard
severity zones, would the project:
a. Substantially impair an adopted emergency
response plan or emergency evacuation
plan?
b. Due to slope, prevailing winds, and other
factors, exacerbate wildfire risks of, and
thereby expose project occupants to,
pollutant concentrations from a wildfire or the
uncontrolled spread of a wildfire?
c. Require the installation or maintenance of
associated infrastructure (such as roads,
fuel breaks, emergency water sources,
power lines, or other utilities) that may
exacerbate fire risk or that may result in
temporary or ongoing impacts on the
environment?
d. Expose people or structures to significant
risks, including downslope or downstream
flooding or landslides, as a result of runoff,
post-fire slope instability, or drainage
changes?

3.2.20.1 Discussion
a-d. According to the CAL FIRE Fire and Resource Assessment Program, the project site is not located within or near a State Responsibility Area or lands classified as a VHFHSZ.

The nearest VHFHSZ is approximately 10 miles east of the project site. The project site is located in a Local Responsibility Area where the Roseville Fire Department is responsible for fire protection services. Because the proposed project consists only of the installation of an electronic billboard and does not involve adding new residents or changing circulation patterns, the proposed project would not impair implementation of an adopted emergency response plan or emergency evacuation plan. Additionally, the topography of the project site is relatively flat, and the site is located in an urbanized area of the City; thus, the project site is not susceptible to downstream flooding or landslide. Therefore, the proposed project would not be subject to substantial risks related to wildfires, and a lessthan-significant impact would occur.

City of Roseville Environmental Checklist
Initial Study/Mitigated Negative Declaration for the
Roseville Digital Billboard Project 3-55 November 2021

3.2.20.2 Mitigation Measures
The proposed project would not result in any potentially significant impacts related to wildfire. Therefore, mitigation would not be required.

3.2.20.3 References
California Department of Forestry and Fire Protection. Fire Hazard Severity Zone Viewer.

Available at: https://egis.fire.ca.gov/FHSZ/. Accessed October 2021.

City of Roseville Environmental Checklist
Initial Study/Mitigated Negative Declaration for the
Roseville Digital Billboard Project 3-56 November 2021

3.2.21 Mandatory Findings of Significance
XXI. Mandatory Findings of Significance
Potentially
Significant
Impact
Less-thanSignificant
with Mitigation
Incorporated
Less-thanSignificant
Impact
No
Impact
a. Does the project have the potential to
substantially degrade the quality of the
environment, substantially reduce the habitat
of a fish or wildlife species, cause a fish or
wildlife population to drop below selfsustaining levels, threaten to eliminate a plant or animal community, substantially reduce
the number or restrict the range of a rare or
endangered plant or animal, or eliminate
important examples of the major periods of
California history or prehistory?
b. Does the project have impacts that are
individually limited but cumulatively
considerable? (“Cumulatively considerable”
means that the incremental effects of a
project are considerable when viewed in
connection with the effects of past projects,
the effects of other current projects, and the
effects of probable future projects.)
c. Does the project have environmental effects
that will cause substantial adverse effects on
human beings, either directly or indirectly?

3.2.21.1 Discussion
a. As discussed in Section 3.2.4, Biological Resources, of this IS/MND, the project site has already been subject to substantial disturbance and construction of the proposed project would not further degrade the quality of the environment, substantially reduce or impact the habitat of substantially reduce or impact the habitat of fish or wildlife species, cause fish or wildlife populations to drop below self-sustaining levels, threaten to eliminate a plant or animal community or reduce the number or restrict the range of a rare or endangered plant or animal. Due to previous disturbance and development of the site, the site does not contain any known historic or prehistoric resources. However, the possibility remains that previously-unknown cultural resources or tribal cultural resources could be encountered during ground disturbing activities. Implementation of Mitigation Measures CUL-1, CUL-2, and TCR-1 would ensure that the proposed project would not eliminate important examples of the major periods of California history or prehistory. Therefore, potential impacts would be less-than-significant with mitigation incorporated. b. The proposed project, in conjunction with other development within the City of Roseville, could incrementally contribute to cumulative impacts in the area. However, as City of Roseville Environmental Checklist
Initial Study/Mitigated Negative Declaration for the
Roseville Digital Billboard Project 3-57 November 2021
demonstrated in this IS/MND, all potential environmental impacts that could occur as a result of implementation of the proposed project would result in no impact or a less-thansignificant impact through applicable General Plan policies and RMC Standards, as well as other local and state policies. In addition, the proposed project would be consistent with the project site’s current land use and zoning designations. Therefore, development of the proposed project would not result in a cumulatively considerable contribution to cumulative impacts to cumulative impacts in the City of Roseville, and the proposed project’s incremental contribution to cumulative impacts would be less than significant. c. As described in this IS/MND, the proposed project would comply with all applicable General Plan policies, RMC standards, and other applicable local and State regulations.

In addition, as discussed in Section 3.2.3, Air Quality, Section 3.2.7, Geology and Soils, Section 3.2.8, Greenhouse Gas Emissions, Section 3.2.9, Hazards and Hazardous Materials, Section 3.2.13, Noise, and Section 3.2.17, Transportation, of this IS/MND, the proposed project would not cause substantial effects to human beings, including effects related to exposure to air pollutants, hazardous materials, noise, and traffic. Therefore, the proposed project would result in a less-than-significant impact.

CEQA Mitigation Monitoring and
Reporting Program
for the
Roseville Digital Billboard Project
December 2021
Roseville Digital Billboard Project 1 December 2021
Roseville Digital Billboard Project

MITIGATION MONITORING AND REPORTING PROGRAM
Introduction
Public Resources Code section 21081.6 and section 15097 of the California Environmental Quality Act (CEQA) Guidelines require public agencies to adopt a monitoring or reporting program for projects approved under CEQA that require implementation of mitigation measures as part of project approval.

The following is the Mitigation Monitoring and Reporting Program (MMRP) for the Roseville Digital Billboard Project (proposed project). The intent of the MMRP is to aid the City of Roseville with implementation and monitoring of mitigation measures adopted as part of the Roseville Digital Billboard Project Final Initial Study/Mitigated Negative Declaration (IS/MND).

The following mitigation measures are from the Roseville Digital Billboard Project Final IS/MND and are the responsibility of the City to implement. The MMRP describes the actions that must take place to implement each mitigation measure, the timing of those actions, and the entities responsible for implementing and monitoring the actions.

MMRP Components
The components of the attached table, which contains applicable mitigation measures, are addressed briefly, below.

Impact: This column summarizes the impact identified in the Final IS/MND.

Mitigation Measure: All mitigation measures identified in the Roseville Digital Billboard Project Draft IS/MND are presented.

Action(s): For every mitigation measure, one or more actions are described. The actions delineate the means by which the mitigation measures will be implemented, and, in some instances, the criteria for determining whether a measure has been successfully implemented.

Where mitigation measures are particularly detailed, the action may refer back to the measure for specifics.

Implementing Party: This item identifies the entity that will undertake the required action.

Timing: Implementation of the action must occur prior to or during some part of project approval, project design or construction or on an ongoing basis. The timing for each measure is identified.

City of Roseville CEQA Mitigation Monitoring and Reporting Program Roseville Digital Billboard
Project 2 December 2021
Monitoring Party: The City of Roseville Development Services Department, in coordination with the Public Works Department, is primarily responsible for ensuring that mitigation measures are successfully implemented. Within the City of Roseville, a number of departments and divisions could have responsibility for monitoring some aspect of the overall project. Other agencies may also be responsible for monitoring the implementation of mitigation measures. As a result, more than one monitoring party may be identified.

City of Roseville CEQA Mitigation Monitoring and Reporting Program Roseville Digital Billboard
Project 3 December 2021
Roseville Digital Billboard Project, Mitigation Monitoring and Reporting Program Impact Mitigation Measures Action(s) Implementing Party Timing Monitoring Party Cultural Resources
Potential for a substantial adverse
change in the significance of
unknown buried cultural resources
encountered during construction
Mitigation Measure CUL-1: Implement Measures to Protect Previously Unidentified Cultural Resources The City shall ensure that construction specifications include the following information in the grading notes.  Construction shall stop if potential cultural resources are encountered. It is possible that previous activities have obscured surface evidence of cultural resources. If signs of an archeological site, such as any unusual amounts of stone, bone, or shell, are uncovered during grading or other construction activities, work will be halted within 100 feet of the find and the City of Roseville will be notified. A qualified archeologist will be consulted for an onsite evaluation. If the site appears to be eligible for listing in state or federal registers, additional mitigation, such as further testing for evaluation or data recovery, may be necessary.  In the event resources are discovered, the City will retain a qualified archaeologist to assess the find and to determine whether the resource requires further study. Any previously undiscovered resources found during construction will be recorded on appropriate California Department of Parks and Recreation 523 forms and evaluated for significance under all applicable regulatory criteria.  All work will stop in the immediate vicinity of the find, and, if the find is determined to be an important cultural resource, the City will make available contingency funding and a time allotment sufficient to allow recovery of an archaeological sample or to implement an avoidance measure. Construction work may continue on other parts of the project while archaeological mitigation takes place.

Stop work if cultural resources
are encountered during grounddisturbing activities and have a qualified archaeologist evaluate
the find and develop a response
plan.

Contractor, Qualified
Archaeologist, and
City of Roseville
Development
Services
Department
During construction Contractor, City of
Roseville
Development
Services
Department
Potential to disturb human
remains, including those interred
outside of dedicated cemeteries
Mitigation Measure CUL-2: Implement Measures if Construction Activities Inadvertently Discover or Disturb Human Remains The City shall ensure that construction specifications include the following in the grading notes.  If human remains are discovered during any phase of construction, including disarticulated or cremated remains, the construction contractor will immediately cease all ground-disturbing activities within 100 feet of the remains and notify the City of Roseville.  In accordance with California State Health and Safety Code Section 7050.5, no further disturbance will occur until the following steps have been completed:
 The County Coroner has made the necessary findings as to origin and disposition pursuant to Public Resources Code Section 5097.98.
 If the remains are determined by the County Coroner to be Native American, NAHC will be notified within 24 hours, and the treatment and disposition of the remains will comply with NAHC guidelines.  It is further recommended that a professional archaeologist with Native American burial experience conduct a field investigation of the specific site and consult with the Most Likely Descendant (MLD), if any, identified by NAHC. As necessary and appropriate, a professional archaeologist may provide technical assistance to the MLD, including excavation and removal of the human remains.

Implement appropriate
treatment for discovery of
human remains and contact the
Placer County coroner. If
remains are Native American,
the coroner shall contact the
NAHC which will appoint an
MLD to provide treatment
recommendations. Develop an
agreement for the dignified
treatment of human remains
and associated or unassociated
funerary objects and implement
provision of the agreement.

Qualified
Archaeologist,
County Coroner,
NAHC, MLD, and
City of Roseville
Development
Services
Department
During construction City of Roseville
Development
Services
Department
Tribal Cultural Resources
Potential for a substantial adverse
change in the significance of
unknown buried tribal cultural
resources encountered during
construction
Mitigation Measure TCR-1: Implement Post Ground Disturbance Site Visit A minimum of seven days prior to beginning earthwork, clearing and grubbing, or other soil disturbing activities, the applicant shall notify lead agency of the proposed earthwork start-date. The lead agency shall contact the United Auburn Indian Community (UAIC) with the proposed earthwork start-date and a UAIC Tribal Representative or Tribal Monitor shall be invited to inspect the project site, including any soil piles, trenches, or other disturbed areas, within the first five days of groundbreaking activity, or as appropriate for the type and size of project,. During this inspection, a UAIC Tribal Representative or Tribal Monitor may provide an on-site meeting for construction personnel information on TCRs and workers awareness brochure.

If any TCRs are encountered during this initial inspection, or during any subsequent construction activities, work shall be suspended within 100 feet of the find and the measures included in the Inadvertent/Unanticipated Discoveries Mitigation Measure shall be implemented. Preservation in place is the preferred alternative under CEQA and UAIC protocols, and every effort must be made to preserve the resources in place, including through project redesign.

Stop work if potential tribal
cultural resources are
encountered during grounddisturbing activities and have a qualified archaeologist, in
consultation with culturally
affiliated tribes, evaluate the
find and develop a response
plan.

Applicant,
Contractor, Qualified
Archaeologist, and
City of Roseville
Development
Services
Department
Prior to and During
construction
Contractor, City of
Roseville
Development
Services
Department
City of Roseville CEQA Mitigation Monitoring and Reporting Program Roseville Digital Billboard
Project 4 December 2021
Roseville Digital Billboard Project, Mitigation Monitoring and Reporting Program Impact Mitigation Measures Action(s) Implementing Party Timing Monitoring Party  The contractor shall implement any measures deemed by CEQA lead agency to be necessary and feasible to preserve in place, avoid, or minimize significant effects to the resources, including the use of a paid Native American Monitor during ground disturbing activities.

Mitigation Measure TCR-2: Implement Measures to Protect Unanticipated Discoveries.

If subsurface deposits believed to be cultural or human in origin, or tribal cultural resources, are discovered during construction, all work shall halt within a 100-foot radius of the discovery, and the Construction Manager shall immediately notify the City of Roseville Development Services Director by phone. The Construction Manager shall also immediately coordinate with the monitoring archeologist or project archaeologist and tribal monitor (if present), or, in the absence of either, contact consulting tribe(s) and a qualified professional archaeologist, meeting the Secretary of the Interior’s Professional Qualification Standards for archaeology and subject to approval by the City, to evaluate the significance of the find and develop appropriate management recommendations, in coordination with the consulting tribe(s) if the find is a tribal cultural resource.

All management recommendations shall be provided to the City in writing for the City’s review and approval. If recommended by the qualified professional archeologist, and consulting tribe(s), and approved by the City, this may include modification of the no-work radius.

The professional archaeologist must make a determination, based on professional judgement and supported by substantial evidence, within one business day of being notified, as to whether or not the find represents a cultural or tribal cultural resource or has the potential to be a cultural or tribal cultural resource. The consulting tribe shall also be provided the opportunity to determine, within one business day of being notified, whether or not the find represents a tribal cultural resource or has the potential to be a tribal cultural resource. The subsequent actions will be determined by the type of discovery, as described below. These include: 1) a work pause that, upon further investigation, is not actually a discovery and the work pause was simply needed in order to allow for closer examination of soil (a “false alarm”); 2) a work pause and subsequent action for discoveries that are clearly not related to tribal resources, such as can and bottle dumps, artifacts of European origin, and remnants of built environment features; and 3) a work pause and subsequent action for discoveries that are likely related to tribal resources, such as midden soil, bedrock mortars, groundstone, or other similar expressions.

Whenever there is question as to whether or not the discovery represents a tribal resource, culturally affiliated tribes shall be consulted in making the determination. Whenever a tribal monitor is present, the monitor shall be consulted.

The following processes shall apply, depending on the nature of the find, subject to the review and approval of the City:
 Response to False Alarms: If the professional archaeologist determines that the find is negative for any cultural indicators and tribal representatives have not indicated the find is a tribal cultural resource, then work may resume immediately upon notice to proceed from the City’s representative. No further notifications or archaeological consultation is necessary if it is determined that the discovery is not a cultural or tribal cultural resource of any kind. The professional archaeologist shall provide written documentation of this finding to the City, which shall include as an attachment any written documentation provided by tribal representatives or monitors.  Response to Non-Tribal Discoveries: If a tribal monitor is not present at the time of discovery and a professional archaeologist determines that the find represents a non-tribal cultural resource from any time period or cultural affiliation, the City shall be notified immediately, to consult on a finding of eligibility and implementation of appropriate treatment measures, if the find is determined to be a Historical Resource under CEQA, as defined in Section 15064.5(a) of the CEQA Guidelines. The professional archaeologist shall provide a photograph of the find and a written description to the City of Roseville. The City of Roseville will notify any [tribe(s)] who, in writing, requested notice of unanticipated discovery of non-tribal resources. Notice shall include the photograph and description of the find, and a tribal representative shall have the opportunity to determine whether or not the find represents a tribal cultural resource. If a response is not received within 24 hours of notification (none of which time period may fall on weekends or City holidays), the City will deem this portion of the measure completed in good faith as long as the notification was made and documented. If requested by a [tribe(s)], the City may extend this timeframe, which shall be documented in writing (electronic communication may be used to satisfy this measure). If a notified tribe responds within 24 hours to indicate that the find represents a tribal cultural resource, then the Response to Tribal Discoveries portion of this measure applies. If the tribe does not respond or concurs that the discovery is non-tribal, work shall not resume within the no-work radius until the City, through consultation as appropriate, determines that the site either: 1) is not a Historical Resource under CEQA, as defined in Section 15064.5(a) of the CEQA Guidelines; or 2) that the treatment measures have been completed to its satisfaction.
 Response to Tribal Discoveries: If the find represents a tribal or potentially tribal cultural resource that does not include human remains, the consulting tribe(s) and City shall be notified. The City will consult with the tribe(s) on a finding of eligibility and implement appropriate treatment measures, if the find is determined to be either a Historical Resource under CEQA, as defined in Section 15064.5(a) of the CEQA Guidelines, or a Tribal Cultural Resource, as defined in Section 21074 of the Public Resources Code. Preservation in place is the preferred treatment, if feasible. Work shall not resume within the no-work radius until the City, through consultation as appropriate, City of Roseville CEQA Mitigation Monitoring and Reporting Program Roseville Digital Billboard
Project 5 December 2021
Roseville Digital Billboard Project, Mitigation Monitoring and Reporting Program Impact Mitigation Measures Action(s) Implementing Party Timing Monitoring Party determines that the site either: 1) is not a Historical Resource under CEQA, as defined in Section 15064.5(a) of the CEQA Guidelines; or 2) not a Tribal Cultural Resource, as defined in Section 21074 of the Public Resources Code; or 3) that the treatment measures have been completed to its satisfaction.
 Response to Human Remains: If the find includes human remains, or remains that are potentially human, the construction supervisor or on-site archaeologist and (if present) tribal monitor shall ensure reasonable protection measures are taken to protect the discovery from disturbance (AB 2641) and shall notify the City and Placer County Coroner (per § 7050.5 of the Health and Safety Code). The provisions of § 7050.5 of the California Health and Safety Code, § 5097.98 of the California Public Resources Code, and Assembly Bill 2641 shall be implemented. If the Coroner determines the remains are Native American and not the result of a crime scene, the Coroner will notify the Native American Heritage Commission (NAHC), which then will designate a Native American Most Likely Descendant (MLD) for the project (§ 5097.98 of the Public Resources Code). The designated MLD will have 48 hours from the time access to the property is granted to make recommendations concerning treatment of the remains. Public Resources Code § 5097.94 provides structure for mediation through the NAHC if necessary. If the landowner does not agree with the recommendations of the MLD, the NAHC can mediate (§ 5097.94 of the Public Resources Code).

If no agreement is reached, the landowner must rebury the remains in a respectful manner where they will not be further disturbed (§ 5097.98 of the Public Resources Code). This will also include either recording the site with the NAHC or the appropriate Information Center; using an open space or conservation zoning designation or easement; or recording a reinternment document with the county in which the property is located (AB 2641). Work shall not resume within the no-work radius until the City, through consultation as appropriate, determines that the treatment measures have been completed to its satisfaction.

RESOLUTION NO. 22-018

APPROVING A GROUND LEASE AGREEMENT, BY AND BETWEEN THE CITY OF ROSEVILLE AND CANDICE L. STEPHENSON AND J. WAYNE STRAUCH, COTRUSTEES OF THE ADMINISTRATIVE TRUST CREATED UNDER THAT SURVISOR’S TRUST UNDER “TRUST AGREEMENT AND DECLARATION OF TRUST” DATED MARCH 15, 1984, AS TO AN UNDIVIDED ONE-HALF (1/2) INTEREST AND CANDICE L. STEPHENSON AND J. WAYNE STRAUCH, COTRUSTEES OF THE ADMINISTRATIVE TRUST CREATED UNDER THAT “MARITAL TRUST” UNDER “TRUST AGREEMENT AND DECLARATION OF TRUST” DATED MARCH 15, 1984, AS TO AN UNDIVIDED ONE-HALF (1/2)

INTEREST, AND AUTHORIZING THE CITY MANAGER TO EXECUTE IT ON

BEHALF OF THE CITY OF ROSEVILLE
WHEREAS, a Ground Lease Agreement for a portion of the property located at 260 S.

Harding Blvd., by and between the City of Roseville and Candice L. Stephenson and J. Wayne Strauch, Co-Trustees of the Administrative Trust Created Under That Survivor’s Trust Under “Trust Agreement and Declaration of Trust” Dated March 15, 1984, as to an undivided onehalf (1/2) interest and Candice L. Stephenson and J. Wayne Strauch, Co-Trustees of the Administrative Trust Created Under That “Marital Trust” Under “Trust Agreement and Declaration of Trust” Dated March 15, 1984, as to an undivided one-half (1/2) interest (the “parties”), has been reviewed by the Council; and
NOW, THEREFORE, BE IT RESOLVED by the Council of the City of Roseville that said Ground Lease Agreement is hereby approved and that the City Manager is authorized to execute it on behalf of the City of Roseville and the City Clerk is authorized to record the Memorandum of Ground Lease.

PASSED AND ADOPTED by the Council of the City ofRoseville this day of , 20 , by the following vote on roll call:

AYES COUNCILMEMBERS:

NOES COUNCILMEMBERS:

ABSENT COUNCILMEMBERS:

MAYOR
ATTEST:

City Clerk

RESOLUTION NO. 22-019

APPROVING A SUBLEASE AGREEMENT, BY AND BETWEEN THE CITY OF

ROSEVILLE AND CLEAR CHANNEL OUTDOOR, LLC, AND AUTHORIZING THE CITY

MANAGER TO EXECUTE IT ON BEHALF OF

THE CITY OF ROSEVILLE
WHEREAS, a Sublease Agreement for the sublease of the digital billboard site located on a portion of the property located at 260 S. Harding Blvd., by and between the City of Roseville and Clear Channel Outdoor, LLC (the “parties”), has been reviewed by the Council; and
NOW, THEREFORE, BE IT RESOLVED by the Council of the City of Roseville that said Sublease Agreement is hereby approved and that the City Manager is authorized to execute it on behalf of the City of Roseville and the City Clerk is authorized to record the Memorandum of Sublease.

PASSED AND ADOPTED by the Council of the City ofRoseville this day of , 20 , by the following vote on roll call:

AYES COUNCILMEMBERS:

NOES COUNCILMEMBERS:

ABSENT COUNCILMEMBERS:

MAYOR
ATTEST:

City Clerk

RESOLUTION NO. 22-020

APPROVING A GROUND LEASE AGREEMENT, BY AND BETWEEN THE CITY OF

ROSEVILLE AND ROSEVILLE JUNCTION, LLC, AND AUTHORIZING THE CITY

MANAGER TO EXECUTE IT ON BEHALF OF

THE CITY OF ROSEVILLE
WHEREAS, a Ground Lease Agreement for a portion of the property located at 290 Conference Center Drive, by and between the City of Roseville and Roseville Junction, LLC (the “parties”), has been reviewed by the Council; and
NOW, THEREFORE, BE IT RESOLVED by the Council of the City of Roseville that said Ground Lease Agreement is hereby approved and that the City Manager is authorized to execute it on behalf of the City of Roseville and the City Clerk is authorized to record the Memorandum of Ground Lease.

PASSED AND ADOPTED by the Council of the City ofRoseville this day of , 20 , by the following vote on roll call:

AYES COUNCILMEMBERS:

NOES COUNCILMEMBERS:

ABSENT COUNCILMEMBERS:

MAYOR
ATTEST:

City Clerk

RESOLUTION NO. 22-021

APPROVING A SUBLEASE AGREEMENT, BY AND BETWEEN THE CITY OF

ROSEVILLE AND CLEAR CHANNEL OUTDOOR, LLC, AND AUTHORIZING THE CITY

MANAGER TO EXECUTE IT ON BEHALF OF

THE CITY OF ROSEVILLE
WHEREAS, a Sublease Agreement for the sublease of the digital billboard site located on a portion of the property located at 290 Conference Center Drive, by and between the City of Roseville and Clear Channel Outdoor, LLC (the “parties”), has been reviewed by the Council; and
NOW, THEREFORE, BE IT RESOLVED by the Council of the City of Roseville that said Sublease Agreement is hereby approved and that the City Manager is authorized to execute it on behalf of the City of Roseville and the City Clerk is authorized to record the Memorandum of Sublease.

PASSED AND ADOPTED by the Council of the City ofRoseville this day of , 20 , by the following vote on roll call:

AYES COUNCILMEMBERS:

NOES COUNCILMEMBERS:

ABSENT COUNCILMEMBERS:

MAYOR
ATTEST:

City Clerk
1 \\Rosenet\rosenetdfs\CITY ATTORNEY\CYCOM\WPDOCS\D001\P005\00062003.DOCX

SUBLEASE AGREEMENT
Between the City of Roseville and Clear Channel Outdoor, LLC (Digital Billboard Site – Portion of 290 Conference Center Drive) THIS SUBLEASE AGREEMENT (“Sublease” or “Agreement”) is made and entered into this day of , 20 (“the Effective Date”), by and between the City of Roseville, a municipal corporation (“City”) and Clear Channel Outdoor, LLC, a Delaware limited liability company (“CCO”).

W I T N E S S E T H:

WHEREAS, Roseville Municipal Code (the “Code”) Chapter 17.17 allows the installation and operation of electronic, digital, programmable, and/or illuminated billboards on City-owned property, which includes leaseholds held by City, visible from Interstate Highway 80 and/or State Route 65; and WHEREAS, in December of 2020, City issued an RFP soliciting proposals from qualified entities to develop and operate two-sided digital billboards on one or more sites located along Interstate 80 and/or State Route 65 and CCO was the successful proposer; and WHEREAS, City has entered into a ground lease agreement (“Ground Lease”) with Roseville Junction, LLC, a Delaware limited liability company (“Landlord”), pertaining to a portion of the real property located within the City of Roseville at 290 Conference Center Drive, which portion is adjacent to State Route 65 and is suitable for the operation of a digital billboard and is more fully described on Exhibit A hereto (“Premises”); and
WHEREAS, City desires to sublease the Premises to CCO, an outdoor advertising company that has extensive experience in successfully installing, operating, and maintaining digital billboards throughout the United States; and
WHEREAS, CCO desires to sublease the Premises from City for the purpose of installing, operating, and maintaining a digital billboard and has the requisite resources and expertise to do so successfully; and
WHEREAS, the City Council of the City has approved the Ground Lease and this Sublease at a public meeting on , 20 , in accordance with Section 17.17.035(A) of the Code; and
WHEREAS, City and CCO desire to enter into this Sublease on the terms and conditions set forth below.

NOW, THEREFORE, the parties agree as follows:

1. Definitions. The following definitions shall apply generally to the provisions of this Sublease.

Other terms may be defined elsewhere in this Sublease.
(a) “Business Day” means any day the Roseville Civic Center located at 311 Vernon Street, Roseville, California, is open to the public.
2 \\Rosenet\rosenetdfs\CITY ATTORNEY\CYCOM\WPDOCS\D001\P005\00062003.DOCX (b) “Caltrans” means the California Department of Transportation. (c) “Caltrans Permits” means all permits and approvals that CCO must obtain from Caltransto install, operate, and maintain the Digital Billboard in accordance with this Sublease. (d) “City Permits” means all building permits, zoning amendments, and other permits, entitlements, and agreements that the City, acting in its governmental capacity, must issue or approve for CCO to install, operate, and maintain the Digital Billboard in accordance with this Sublease.
(e) “Commencement Date” means the date as of which both of the following have occurred: the City has finally approved the Plans (defined in Section 6(a)), and CCO has received all necessary governmental permits and approvals for the Digital Billboard including the Caltrans Permits and the City Permits and all rights to install digital displays. (f) “Digital Billboard” means the two-sided outdoor-advertising sign that CCO will install and operate on the Premises in accordance with the criteria set forth in Exhibit B-1 (Digital Billboard Message Center Operating Requirements) to this Sublease. The Digital Billboard consists of a Message Center with two (2) 14’ x 48’ display faces (excluding cabinetry and trim) and a Sign Structure. The Digital Billboard may be operated by CCO with a digital face or faces, with a traditional face or faces or some combination thereof, at its sole discretion.
(g) “Effective Date” means the date as of which both the City and CCO have signed this Sublease as evidenced by the date first written above.
(h) “Hazardous Substances” means any material or substance identified in Exhibit C to this Sublease.
(i) “Include” and its variants are not restrictive. For example, “includes” means “includes but not limited to,” and “including” means “including but not limited to.” (j) “Lease” means the Ground Lease Agreement by and between the City and Landlord with respect to the Premises.
(k) “Message Center” means the portion of the Digital Billboard structure that consists of backto-back display areas used for general commercial advertising, with each of the two areas measuring 14 feet high and 48 feet wide. The Message Center may be operated by CCO with a digital face or faces, with a traditional face or faces or some combination thereof, at its sole discretion. The Message Center is more particularly described in Exhibit B-1. (l) “Operational” means the Digital Billboard is fully constructed and fully capable, legally and functionally, of displaying advertising on the Message Center and connected to a permanent power supply.
(m) “Operations Phase” means the first day on which the Digital Billboard is Operational. 3 \\Rosenet\rosenetdfs\CITY ATTORNEY\CYCOM\WPDOCS\D001\P005\00062003.DOCX (n) “Premises” means the City-leased real property described and depicted in Exhibit A. In addition, CCO’s rights of ingress, egress, access, utilities maintenance, and visibility shall extend across, over, under, and above the Property.
(o) “Sign Structure” means the portion of the Digital Billboard other than the Message Center, and it includes all ancillary equipment and utilities installed on the Premises. The Sign Structure is more particularly described in Exhibit B-2 (Digital Billboard Design). (p) “Sublease Year” means one of the consecutive 12-month periods beginning on the first day of the Operations Phase.
(q) “Term” means the entire time this Sublease is in effect. As specified in Section 3, it consists of the Initial Term, the Extended Term, and any period of holding over.

2. Sublease of Premises. The City represents and warrants that the Lease is in full force and effect and that the City has the authority to enter into this Sublease and has good and valid leasehold title to the Premises. The City hereby subleases the Premises to CCO, and CCO hereby subleases the Premises from the City, on the terms and conditions set forth in this Sublease. The Sublease applies to the Premises and to the rest of the Property for ingress, egress, utility maintenance, and visibility.

3. Term of Sublease.
(a) Initial Term. The “Initial Term” of this Sublease shall be coextensive with the initial term of the Ground Lease, commencing on the Effective Date and ending on the date that is twenty (20) years after the first day of the Operations Phase. (b) Extended Term. At the end of the Initial Term, CCO will have the right to extend this Sublease for an additional five (5) years upon the same terms and conditions that applied during the Initial Term (the “Extended Term”). The period of the Extended Term shall be coextensive with the Ground Lease and City covenants to exercise its right to extend for an additional five (5) years under the Ground Lease. To exercise its right to the Extended Term, CCO must not be in default of this Sublease and must give the City a written notice of extension no earlier than one hundred and eighty (180) days and not later than ninety (90) days before the Initial Term ends. The Extended Term begins when the Initial Term ends, and it ends five (5) years after that date. (c) Expiration of Sublease and Holding Over. This Sublease expires automatically at the end of the Initial Term unless extended in accordance with Section 3(a). If this Sublease is extended, then it expires automatically at the end of the Extended Term. Any holding over after expiration will not constitute a renewal of this Sublease but will be on a month-to-month tenancy on the same terms and conditions that applied at expiration.
(d) CCO shall not commence any work on the Premises until such time that memoranda of the Lease and Sublease have been recorded with the Placer County Recorder’s Office. The parties shall cooperate in good faith and without liability to each other to record the memoranda of Ground Lease and Sublease.

4. Consideration. As consideration for the rights and benefits it enjoys under this Sublease, including the use and occupancy of the Premises during the Term, CCO shall do all of the following:
4 \\Rosenet\rosenetdfs\CITY ATTORNEY\CYCOM\WPDOCS\D001\P005\00062003.DOCX (a) Conditional Signing Bonus. CCO shall pay the City a one-time “Conditional Signing Bonus” of $25,000 within five (5) Business Days after the Effective Date. The City shall refund the Conditional Signing Bonus within five (5) Business Days after the City and CCO agree that CCO is not able to obtain, through no fault of its own, either the Caltrans Permits or the City Permits.
(b) Additional Signing Bonus. CCO shall pay the City a one-time “Additional Signing Bonus” of $225,000 within five (5) Business Days after the date the Operations Phase begins. (c) Annual Rent. CCO shall pay annual base rent (“Annual Base Rent”) in the amount of $380,000, payable in twelve (12) equal monthly installments on or before the first day of each month (prorated for any partial months). In addition, within thirty (30) days following the one (1) year period after the Rent Commencement Date and each anniversary thereof during the Term, CCO shall pay to City the amount, if any, by which forty-five percent (45%) of the annual net advertising revenue (defined as gross advertising revenue less any agency commission) indefeasibly received and recognized by CCO for the Digital Billboard in respect of such oneyear period exceeds the Annual Base Rent paid to the City during such year (“Percentage Rent”).

Such Percentage Rent payment shall be accompanied by a reasonably detailed statement of how such Percentage Rent was calculated. On the first anniversary of the Operational Date and each anniversary thereafter, during the Initial Term or any Extended Term, the Annual Base Rentshall be increased by two percent (2%) of the prior year’s Annual Base Rent. (1) Annual Base Rent installments are due and payable on the first day of each calendar month at the address set forth for the City in Section 12(c), directed to the Finance Department, Attn:

Cash Management. Any installment of Annual Rent that is not paid within twenty (20) days after it is due and payable following receipt of written notice will increase by five percent (5%). (2) If the Rent Commencement Date begins on a day other than the first day of a month, then the first and last months' installments of Annual Base Rent will be prorated. (3) At the end of the first (1st) anniversary of the commencement of the payment of Annual Base Rent hereunder and each anniversary thereafter, CCO shall maintain and make available at its Sacramento office (or such other CCO location where the records may be kept), once in every twelve-month period for the prior twelve-month period, for the City's review and audit, all contracts, leases, invoices, and other records that are relevant to the accurate determination of Percentage Rent. CCO shall make such records available for review by City within fifteen (15) Business Days following City's written request. CCO shall retain the related records for at least three (3) years.
(4) CCO may offset Annual Base Rent as follows:
(A) If there is a material diversion of traffic from, or a material reduction or change in the directional flow of traffic on, the portion of State Route 65 adjacent to the Premises that results in CCO being required to compensate its third-party advertisers for a loss of advertising, and if the diversion, disruption, or change continues uninterrupted for at least five (5) days, then CCO may offset Annual Rent by the amount if any, equivalent to the value that CCO provides to its third-party advertisers because of the diversion or reduction. In no event shall the offset exceed one-half (1/2) of the Annual Base Rent.

CCO must provide the City with evidence, reasonably satisfactory to the City, that CCO actually provided such equivalent value equal to the amount offset. 5 \\Rosenet\rosenetdfs\CITY ATTORNEY\CYCOM\WPDOCS\D001\P005\00062003.DOCX (B) If there is a force-majeure event (see Subsection 12(e)) that continues uninterrupted for at least five (5) days, then CCO may reduce the Annual Base Rent by the percentage, if any, that CCO’s revenues from the Digital Billboard have decreased as a result. (d) Additional Consideration. CCO shall commit space to the City within one (1) eight (8) second advertising spot in a standard rotation of eight (8) slots, to be divided equally between the two display faces on the Digital Billboard at all times for the advertisement of City Messages. As long as CCO operates a digital display on the Digital Billboard CCO shall agree to use one (1) guaranteed slot of no greater than eight (8) seconds in the standard rotation of eight (8) slots divided equally between the two digital display faces on the digital Billboard to display Citysponsored event announcements and non-commercial public service announcements to promote the civic interests of the City ("City Messages") with no charge for advertising space. The City Messages are subject to the following conditions and parameters:
(1) The City shall provide its request for a new City message and/or changes to an existing City message schedule and/or content at least forty-eight (48) hours in advance of the date/time it wishes for a new or changed message to run. City shall be responsible for providing CCO with its City Messages and for any costs associated with providing CCO associated artwork in acceptable format and will be subject to CCO's standard advertising copy rejection and removal policies which allow CCO the right in its sole discretion to approve or disapprove copy and remove copy once posted or displayed. (2) The City shall not charge for, or exchange goods or services for, any sign space granted on the Digital Billboard.
(3) The City must submit "camera ready art" utilizing formats and protocols acceptable to CCO from time to time or pay production costs. All copy shall be submitted to CCO at least ten (10) Business Days in advance.
(4) If at any time in the future CCO removes the Digital Display(s) from the sign structure or CCO is unable to operate the Digital Display(s), for any reason, the advertising spot commitments in this section shall be automatically terminated and rendered null and void, and CCO shall be under no obligation whatsoever to provide the City with any type of free advertising space. However, at any time CCO operates the Digital Display(s) with electronic/digital technology, the advertising spot commitment shall remain in place. (5) It is expressly understood and agreed that City Messages may not include any names, logos or marks associated with any third party non-governmental person or entity or any products or any services associated with any third party non-governmental person or entity. (6) Any unused space will be forfeited and shall not roll over. (7) Notwithstanding anything else in this Sublease, the City shall and hereby does agree to indemnify, defend and hold harmless CCO for, from and against, any claims, costs (including, but not limited to, court costs and reasonable attorneys' fees), losses, actions or liabilities arising from or in connection with any third party allegation concerning any City Message, including but not limited to a claim that any portion of any City Message infringes or violates the rights, including, but not limited to, copyright, trademark, trade secret or any similar right, of any third party. This indemnity shall not include an obligation for City to be responsible for 6 \\Rosenet\rosenetdfs\CITY ATTORNEY\CYCOM\WPDOCS\D001\P005\00062003.DOCX compensating CCO for any lost profits or consequential damages or any similar remedy that CCO may assert against any third party. Notwithstanding anything else in this Sublease, this section shall survive any termination or expiration of this Sublease.

5. Use of Premises.
(a) Condition of Premises. The City makes no representations or warranties of any kind, express or implied, written or oral, about any of the following: the physical condition of the Premises; the suitability of the Premises for CCO’s anticipated use; any limitations on CCO’s use of the Premises, including limitations arising from zoning laws, environmental laws, or other laws, regulations, or governmental requirements; the costs of conducting CCO’s business on the Premises; or the condition of the soils or ground waters of the Premises. By taking possession of the Premises, CCO accepts the Premises “as is” and acknowledges that the Premises are satisfactory for CCO’s purposes. CCO has ascertained the condition of the Premises through its own independent investigation and has relied solely on that independent investigation when entering into this Sublease.
(b) Permitted Uses. Except as otherwise provided in Section 6(k), CCO has the exclusive right to display outdoor advertising on the Premises. The City shall not authorize any other off-site outdoor advertising on the Premises. In addition, the City shall not authorize any off-site outdoor advertising on any other City-owned or City-controlled property if the outdoor advertising would be within 1,500 feet of the Digital Billboard on either side of the freeway.

CCO’s exclusive right to conduct outdoor advertising on the Premises includes the following:
(1) Installing, operating, maintaining, repairing, improving, repositioning (with the City’s consent), and removing the Digital Billboard on or from the Premises when this Sublease terminates.
(2) All rights of ingress and egress over the Premises and the Property that CCO needs to access and provide utilities to the Digital Billboard.
(3) All necessary rights of visibility over, across and above the Property. (4) Licensing the use of the Digital Billboard, or any portion it, for any lawful purpose related to outdoor advertising.
(c) Prohibited Uses.
(1) Hazardous Substances. CCO shall not use, handle, store, transport, generate, sublease, or dispose of any Hazardous Substances on, under, or about the Premises, except as follows:

CCO may use Hazardous Substances that CCO needs to install, operate, maintain, repair, improve, reposition, or remove the Digital Billboard in accordance with this Sublease if the City has consented in writing before the Hazardous Substances are brought on the Premises.

Within ten (10) days after receiving the City’s written request, CCO shall disclose in writing all Hazardous Substances then being used on the Premises, the purpose and duration of the use, and the manner of storage anddisposal.
(2) Unlawful Activities. CCO shall not use or permit the Premises to be used in any way that violates this Sublease or any valid and applicable statute, ordinance, regulation, rule, or order of any federal, state, or local governmental entity (including the City) in effect as of the 7 \\Rosenet\rosenetdfs\CITY ATTORNEY\CYCOM\WPDOCS\D001\P005\00062003.DOCX Effective Date. CCO shall not maintain or commit, or permit the maintenance or commission of, any public or private nuisance as defined by any law applicable to the Premises on or after the Effective Date. CCO hereby waives any rights to compensation it may have if a court finds that the Digital Billboard constitutes a public or private nuisance under any valid and applicable federal, state, or local law and for that reason orders CCO to remove or modify the Digital Billboard or to limit the operation of the Message Center. This waiver will not apply if the court's finding of nuisance is in an action brought by the City or under a City ordinance enacted after the Effective Date
(3) Encumbrances. CCO shall not encumber the Premises or anypart of the Premises, for any purpose, without the City’s prior written consent, which the City may withhold for any reason. CCO shall keep the Premises free of all liens and other encumbrances other than those, if any, to which the Cityconsents.
(d) Unobstructed Use.
(1) The City shall not allow or require either of the following (each, an “Obstruction”):
(A) On the Property – any structure, tree, or vegetation that obstructs the view of the Message Center from State Route 65.
(B) On any City-owned or City-controlled real property in the immediate vicinity of the Premises – any tree or vegetation that is within 1,000 feet of the Digital Billboard along State Route 65 and obstructs the view of the Message Center from State Route

65. (2) If CCO notifies the City in writing that an Obstruction exists, and if the City authorized or actively caused the Obstruction, then the City shall remove or remedy the Obstruction at its own cost within fifteen (15) days after receiving the notice. If the City fails to remove the Obstruction within fifteen (15) days after receiving the notice, then CCO may remove the Obstruction at the City’s expense after coordinating with the appropriate department of the City.
(3) If CCO notifies the City in writing that an Obstruction exists, and if the City did not authorize or actively cause the Obstruction, then the City may remove or remedy the Obstruction at its own cost within fifteen (15) days after receiving the notice. If the City does not remove or remedy the Obstruction within the fifteen (15) days, then, at no cost to the City, and after coordinating with the appropriate department of the City, CCO may remove the Obstruction described in the notice.
(4) CCO’s exercise of its rights under this Section 5(d) are in addition to any other remediesit may have under this Sublease.

6. Installation and Operation of Digital Billboard. CCO shall install and operate the Digital Billboard Sign Structure and Message Center on the Premises in accordance with this Section 6 and consistent with Section 5, all at no cost to the City.
(a) Plans and Specifications. At no cost to the City, CCO shall prepare complete plans and specifications for the Digital Billboard, working closely with the City to develop plans and 8 \\Rosenet\rosenetdfs\CITY ATTORNEY\CYCOM\WPDOCS\D001\P005\00062003.DOCX specifications that are mutually acceptable (the “Plans”). CCO shall submit the Plans to the City for final approval, which the City shall not unreasonably withhold, condition or delay. (b) Caltrans Permits. As soon as practicable after the Effective Date, CCO shall apply to Caltrans for all Caltrans Permits, and the City shall cooperate with CCO in that effort, all at no cost to the City. All Caltrans Permits are to be obtained and secured for CCO’s sole benefit and are to be issued in CCO’s name or, if that is not possible, in the City’s name on CCO’s behalf and for CCO’s sole benefit. CCO shall perform all obligations under the Caltrans Permits at no cost to the City, and shall be solely responsible for any violations, fines, and penalties thereof caused by CCO.
(c) City Permits. The City shall diligently process CCO’s applications for all City Permits. This Sublease does not commit the City in advance to approve the City Permits; and this Sublease does not constrain the City’s discretion, acting as a government, with respect to the CityPermits specifically or to the Digital Billboard generally.
(d) Installation. CCO shall begin installing the Digital Billboard as soon as practicable after the Commencement Date and shall diligently pursue installation to completion without unnecessary interruption so that the Digital Billboard is Operational within two (2) years after the Commencement Date, unless the parties agree in writing to an extension of time, otherwise this Agreement may be terminated at the discretion of City upon thirty (30) days’ notice to CCO in the event the Digital Billboard is not Operational as of such date. CCO will be excused, however, for any delays in beginning or completing installation that are caused by a Force Majeure Event, as defined in Section 12(e)(1). CCO shall use reasonable diligence to avoid such delays and to resume work as promptly as possible after such a delay. In the event of any such delays due to a Force Majeure Event, the Commencement Date and all obligations of CCO due on the Commencement Date shall be extended accordingly. (e) Ownership. CCO will be the owner of the Digital Billboard and all permits and authorizations that relate to it, including the City Permits and the Caltrans Permits. (f) Security Fences. If requested by the City, before beginning installation of the Digital Billboard, CCO shall enclose with a temporary security fence the portion of the Premises CCO needs to install, operate, maintain, and repair the Digital Billboard. CCO shall maintain the temporary security fence until CCO replaces it with a permanent security fence that circumscribes an area coextensive with the area the temporary fence circumscribed. CCO shall install the permanent security fence around the Digital Billboard at the beginning of the Operations Phase and maintain that fence until the end of the Term. CCO shall install and maintain the temporary and permanent fences at no cost to the City and shall consult with the City on each fence’s location and design.
(g) Maintenance. At no cost to the City, CCO shall maintain the Premises and shall maintain, repair, and improve the Digital Billboard in accordance with the highest standards of the outdooradvertising industry. CCO’s maintenance obligation under this Section 6(g) includes the obligation to remove promptly any graffiti from the Premises and the Digital Billboard. CCO’s obligation to improve the Digital Billboard under this Section 6(g) includes the obligation to replace the entire Message Center every ten (10) years if necessary in CCO’s discretion. The City is not obligated to maintain the Premises or to maintain or repair the Digital Billboard. If, however, CCO does not maintain the Premises, then the City may notify CCO in accordance with Section 12(c) that the City will perform the maintenance described in the notice if CCO 9 \\Rosenet\rosenetdfs\CITY ATTORNEY\CYCOM\WPDOCS\D001\P005\00062003.DOCX does not begin to do so within fifteen (15) Business Days. If CCO does not begin to perform the needed maintenance within fifteen (15) Business Days after the notice is given, then the City may perform the maintenance described in the notice, and CCO shall reimburse the City’s actual and reasonable costs.
(h) Insured Damage or Destruction. This Sublease will continue in full effect if the Digital Billboard is damaged or destroyed in whole or part by any cause covered by the fire-and-casualty insurance CCO is required to maintain under Section 11(a)(3), subject to the following:
(1) CCO shall repair or replace the Digital Billboard at no cost to the City using the insurance proceeds CCO receives or is entitled to receive under the fire-and-casualty policy. CCO shall promptly apply for, and diligently pursue the issuance of, any permits or approvals it needs to repair or replace the Digital Billboard. Within thirty (30) days after obtaining the necessary permits and approvals, CCO shall begin work to repair or replace the Digital Billboard. CCO shall complete the work within one hundred and eighty (180) days after the work begins and shall pay any costs that exceed the available insurance proceeds. (2) CCO may elect not to repair or replace the Digital Billboard if:
(A) the cost to repair or replace it exceeds fifty percent (50%) of its fair-market value immediately before it is damaged or destroyed; and
(B) the damage or destruction occurs:
(i) during the last two (2) years of the Initial Term (if CCO opts not to extend this Sublease under Section 3(b)); or
(ii) during the last two (2) years of the Extended Term (if CCO opts to extend this Sublease under Section 3(b)).
(3) If CCO elects, under Section 6(h)(2), not to repair or replace the Digital Billboard, then CCO shall:
(A) notify the City in writing of its election;
(B) use the insurance proceeds CCO receives for the damage or destruction to remove the Digital Billboard and restore the Premises in accordance with Section 6(l); and (C) pay to the City half of the insurance proceeds that remain after CCO has performed under Section 6(h)(3)(B), and this Sublease will terminate when those proceeds are so paid (City shall have the right to audit the allocation and expenditure of insurance proceeds).
(i) Uninsured Damage. If the Digital Billboard is damaged by any cause not covered by the fireand-casualty insurance CCO is required to maintain under Section 11(a)(3), then this Sublease will continue in full effect only if the cost to repair the damage is less than or equal to the Annual Rent in effect when the damage occurs, subject to the following:
(1) CCO shall promptly apply for, and diligently pursue the issuance of, any permits or approvals it needs to repair the damage to the Digital Billboard. 10 \\Rosenet\rosenetdfs\CITY ATTORNEY\CYCOM\WPDOCS\D001\P005\00062003.DOCX (2) As soon as reasonably practicable after obtaining the necessary permits and approvals, CCO shall repair the damage at no cost to the City.
(j) Utilities. At no cost to the City, CCO shall provide and pay for all utility connections, utility equipment, and utility service required to install, operate, maintain, repair, improve, or reposition the Digital Billboard throughout the Term. CCO shall coordinate with the City and Roseville Electric for utility tie-ins and electrical power sources that CCO may need to operate the Digital Billboard.
(k) Advertising Rights. During the Term, CCO will have the exclusive right to enter into agreements for advertising on the Digital Billboard, subject to the following:
 Operation of the Message Center. In operating the Message Center, CCO shall conform to all valid and applicable laws and regulations, including laws and regulations pertaining to outdoor advertising. CCO shall not display any message that in the reasonable judgment of the City Manager or the City Manager’s designee falls within one or more of the following categories (“Restricted Advertising”):
• Automalls. The message promotes competing “automalls” or individual dealerships located outside the City of Roseville’s jurisdictional boundary; provided that advertising for a specific automobile brand or manufacturer is permitted.
• False, Misleading, or Deceptive Commercial Speech. The message proposes a commercial transaction, and the message, or any material contained in it, is false, misleading, or deceptive.
• Unlawful Goods or Services. The message, or any material contained in it, promotes or encourages, or appears to promote or encourage, the use or possession of unlawful or illegal goods or services.
• Unlawful Conduct. The message, or any material contained in it, promotes, depicts or encourages, or appears to promote, depict or encourage, unlawful, anti-social or illegal behavior or activities.
• Endorsement. The message, or any material contained in it, implies or declares an endorsement by the City of Roseville of any service, product or point of view, without prior written authorization of the City of Roseville (through its City Manager).
• Obscenity or Nudity. The message, or any material contained in it, contains obscene matter, images of nudity or any other matter that is prohibited under the provisions of Chapter 7.5 (beginning with Section 311) of Title 9 of Part 1 the California Penal Code, and as such laws may be amended or supplemented.
• Prurient Interests. The message, or any material contained in it, describes, depicts, or represents sexual activities, or aspects of the human anatomy in a way that the average adult, applying contemporary community standards, 11 \\Rosenet\rosenetdfs\CITY ATTORNEY\CYCOM\WPDOCS\D001\P005\00062003.DOCX would find appeals to the prurient interest of minors or adults, or contains any other matter that is prohibited under the provisions of Chapter 7.6 (beginning with Section 313) of Title 9 of Part 1 of the California Penal Code, and as such laws may be amended or supplemented.
• Profanity, Vulgarity, Riot. The message, or any material contained in it, is profane or vulgar, or presents a clear and present danger of causing a riot, disorder, or other imminent threat to public safety, peace or order. • Community Standards. The message, or any material contained in it, is so objectionable under contemporary community standards as to be reasonably foreseeable that it will result in harm to, disruption of, or interference with the operations of the City of Roseville.
• Libelous Speech, Copyright Infringement. The message, or any material contained in it, is libelous, or is an infringement of a copyright, trademark or registered mark.
• Demeaning or Disparaging. The message, or any material contained in it, demeans or disparages an individual or group of individuals. • Injurious to the City of Roseville. The message, or any material contained in it, denigrates the City of Roseville, its officers, agents, or employees. • Tobacco. The message, or any material contained in it, promotes or depicts the sale or use of tobacco or tobacco-related products, except products that counteract symptoms of tobacco habituation.
• Cannabis. The message, or any material contained in it, promotes or depicts the sale or use of cannabis or cannabis-related products. • Firearms. The message, or any material contained in it, directly or indirectly promotes the sale or use of a firearm or contains an image or depiction of a firearm.
• Political Campaign Speech. The message, or any material contained in it, contains political campaign speech. For purposes of this Lease, the term “political campaign speech” is speech that: (1) supports or opposes or appears to support or oppose a ballot measure, initiative, or referendum; or (2) refers to any candidate for public office.
• Religion. The message, or any material contained in it, advocates or opposes a religion or religious belief.
• Traffic Interference. The message, or any material contained in it, displays any word, phrase, symbol, or character likely to interfere with, mislead, or distract traffic, or conflict with any traffic control device. 12 \\Rosenet\rosenetdfs\CITY ATTORNEY\CYCOM\WPDOCS\D001\P005\00062003.DOCX • Distraction. The message, or any material contained in it, incorporates any rotating, revolving, or flashing devices, or any other moving parts not typical of Message Centers.
• Violence. The message, or any material contained in it, contains an image or description of graphic violence, including, but not limited to: (1) the depiction of human or animal bodies or body parts, or fetuses, in states of mutilation, dismemberment, decomposition, or disfigurement; and (2) the depiction of weapons or other implements or devices associated in the advertisement with an act or acts of violence or harm on a person or animal. • “Adult”-Oriented Goods or Services. The message, or any material contained in it, promotes or encourages, or appears to promote or encourage, a transaction related to, or uses brand names, trademarks, slogans or other materials which are identifiable with, films rated “X” or “NC-17", video games rated “A” or “M,” adult book stores, adult video stores, nude and/or topless clubs and other adult entertainment establishments, adult telephone services, adult Internet sites, and escort services.
• Human Reproduction or Sexuality. The message, or any material contained in it, promotes products or services related to human reproduction or sexuality, including but not limited to contraceptive products or services, other products or services related to sexual hygiene, and counseling services for pregnancies, abortions or other sexual matters.
• Graffiti or Vandalism. The message, or any material contained in it, uses images or symbols that depict or represent graffiti or vandalism. • Web Addresses and Telephone Numbers. The message, or any material contained in it, directs viewers to a website or telephone number that contains material that is Restricted Advertising.
• Public Forum. The message, or any material contained in it, if posted individually or in combination with other messages, causes City of Roseville Property to become a public forum for the dissemination, debate, and/or discussion of public issues.
 Removal of Restricted Advertising. In the event that CCO posts such Restricted Advertising, CCO shall remove such Restricted Advertising within twenty-four (24) hours’ written notice from the City.
 Amber Alerts and Public-Service Messages. CCO shall utilize the Message Center to display “Amber Alert” messages in accordance with national Amber Alert guidelines. In addition, CCO shall utilize the Message Center for the purpose of displaying public-service messages (e.g., reports of commute times, drunk-drivingawareness messages, reports of serious accidents, emergency-disaster communications). Such messages may be generated by Caltrans, the City or other governmental agency and provided without cost, on a time-available basis. 13 \\Rosenet\rosenetdfs\CITY ATTORNEY\CYCOM\WPDOCS\D001\P005\00062003.DOCX  City Sign. On each side of the Sign Structure, CCO shall install, maintain, and repair a non-digital City sign that faces the same direction as a display area on the Message Center. The size and design of the City sign shall substantially comply with the criteria set forth in Exhibit B -2.
(l) Removal of Digital Billboard. When the Term or Sublease ends, whether it expires as scheduled or is terminated early, CCO shall promptly apply for, and diligently pursue the issuance of, at no cost to the City, any permits or approvals it needs to remove the above-ground portions of the Digital Billboard. Within one hundred and twenty (120) days after obtaining the necessary permits and approvals, CCO shall remove the Digital Billboard from the Premises and restore the Premises to their pre-sublease condition, reasonable wear and tear excepted, all at no cost to the City, except that CCO is not obligated to remove the below-ground elements of the Sign Structure. Removal of the Digital Billboard shall be conducted in such a way as to not unreasonably interfere with the business operations of Landlord on the adjacent premises.

7. Early Termination.
(a) City’s Termination Rights. Without prejudice to its other remedies at law or in equity, the City may terminate this Sublease, at any time and in its sole discretion, effective thirty (30) days after the City gives CCO written notice of termination, if any of the following circumstances occurs:
(1) CCO breaches its obligation to pay a monthly installment of Annual Rent when due and does not cure the breach within thirty (30) days after the City serves CCO with a written notice of breach.
(2) CCO breaches its obligation to perform in accordance with any material provision of this Sublease other than the obligation to pay Annual Rent and (A) does not cure the breach within thirty (30) Business Days after the City serves CCO with a written notice of breach or, if the breach cannot reasonably be cured within thirty (30) Business Days, (B) does not commence to cure within thirty (30) Business Days after the City serves CCO with a written notice of breach and CCO fails to diligently pursue the cure to completion within ninety (90) Business Days after commencement or such longer period as may be reasonably necessary. The express designation in this Sublease of a provision as “material” does not imply that other provisions are not material. (3) The Digital Billboard is not Operational within two (2) years after the Commencement Date.
(b) CCO’s Termination Rights. Without prejudice to its other remedies at law or in equity, including the right to seek just compensation under the laws of eminent domain as described in Section 9, CCO may terminate this Sublease, at any time and in its sole discretion, effective thirty (30) days after CCO gives the City written notice of termination, if any of the following circumstances occurs:
(1) The view of the Message Center’s display area from the portion of State Route 65 adjacent to the Premises is materially obstructed, and CCO did not cause the obstruction. This Section 7(b)(1) does not apply to Obstructions covered by Section 5(d). 14 \\Rosenet\rosenetdfs\CITY ATTORNEY\CYCOM\WPDOCS\D001\P005\00062003.DOCX (2) CCO cannot safely use the Premises to install, operate, maintain, repair, or improve the Digital Billboard because of a non-remediable condition, and CCO did not cause the condition.
(3) There is a material diversion of traffic from, or a material reduction or change in the directional flow of traffic on, the portion of State Route 65 adjacent to the Premises, and the diversion or disruption continues uninterrupted for at least twelve (12) consecutive months. (4) Through no fault of its own, CCO cannot obtain or maintain the governmental permits required to install, operate, maintain, repair, or improve the Digital Billboard (either with digital and/or non-digital display faces), including the Caltrans Permits and the City Permits.
(5) Use of the Message Center for its intended purpose is prevented or limited by law, or CCO is required by any court or other governmental entity, for reasons other than eminent domain, to remove the Digital Billboard from the Premises. (6) The Digital Billboard is damaged by a casualty for which CCO is not required under this Sublease to carry insurance, and the cost to repair the damage exceeds the Annual Rent in effect when the damage occurs.
(7) Upon termination or nonperformance of the Lease.
(c) CCO’s Right to Renegotiation. If any of the circumstances identified in Section 7(b) occurs (or if CCO can no longer operate the Digital Billboard with digital display faces but can operate the Sign Structure with printed or traditional faces and CCO has elected not to terminate this Sublease), then, at its discretion and in lieu of termination, CCO may request that the City negotiate on reducing the Annual Rent to an amount that reasonably reflects the diminished value of the Digital Billboard to CCO, and on receiving the request the City shall negotiate in good faith with CCO. The City is not required, however, to agree on a reduction. (d) City’s and CCO’s Additional Termination Rights. Without prejudice to their other remedies at law or in equity, either party may terminate this Sublease if the other party:
(1) has an order for relief entered with respect to it, commences a voluntary case, or has an involuntary case filed against it under any applicable bankruptcy, insolvency, or other similar law then in effect, and the order or case is not stayed, withdrawn, or settled within sixty (60) days after it is entered, commenced, or filed (11 U.S.C. § 365(e)(2)(A), as amended, or any successor statute); or
(2) files for reorganization, becomes insolvent, or has a receiver or other officer with similar powers appointed for its affairs in any court with jurisdiction, whether or not with its consent (unless dismissed, bonded, or discharged within sixty (60) days after appointment).
(e) CCO’s Right to Succeed to the Lease. Notwithstanding the foregoing, in the event that Digital Billboard faces are removed for any reason and replaced by vinyl or traditional faces, CCO may elect to terminate this Sublease, and CCO shall in such event succeed to the City’s interest under the Lease and the City shall execute any and all documentation necessary to effect such succession and CCO shall have no further obligations to the City hereunder. In addition, if this 15 \\Rosenet\rosenetdfs\CITY ATTORNEY\CYCOM\WPDOCS\D001\P005\00062003.DOCX Sublease is terminated for any reason, provided CCO is not in default hereunder, CCO shall have the right to succeed to City’s interest under the Lease.

8. Taxes. CCO is responsible for and shall pay or otherwise discharge, without abatement or deduction, all taxes levied on, or directly assessed on, CCO’s outdoor-advertising activities on the Premises. This obligation includes, but is no limited to, payment of any:
(a) sales or similar tax on CCO’s sale of advertising space on the Digital Billboard; (b) possessory-interest tax related to this Sublease or to CCO’s possession or use of the Premises; and
(c) real-property tax assessed on the Digital Billboard and personal-property tax levied on CCO’s personal property on the Premises.

9. Eminent Domain.
(a) Definitions. The following definitions apply to this Section 9:
(1) “Condemning Entity” means any entity that by law may exercise the power of eminent domain to acquire possession of, and title to, any of the following: the Digital Billboard, the entire Premises, or an Essential Part of the Premises. (2) “Essential Part of the Premises” means any portion of the Premises that is reasonably necessary for installing, operating, maintaining, repairing, or improving the Digital Billboard in accordance with this Sublease.
(b) Termination Events. This Sublease will terminate if a Condemning Entity acquires the Digital Billboard, the entire Premises, or an Essential Part of the Premises:
(1) by using the power of eminent domain; or
(2) through negotiations under the threat of using the power of eminent domain. (c) Termination Date; Rent Refund; Caltrans Permits. Termination under this Section 9 will occur on the date the Condemning Entity obtains possession of, or title to, the Digital Billboard, the entire Premises, or the Essential Part of the Premises, whichever occurs first. Within fifteen (15) Business Days after the termination date, the City shall:
(1) refund to CCO any pre-paid Annual Rent for the unexpired portion of the Term; and (2) relinquish any interest it may have in the Caltrans Permits and execute any documents needed to confirm that CCO is the sole owner of the Caltrans Permits. (d) Compensation. If termination occurs under this Section 9, then CCO and the City may each independently seek to recover from the Condemning Entity all compensation and other remedies provided by law for the interests taken from them. But the City may not seek or recover compensation for CCO’s lost interests, and CCO may not seek or recover compensation for the City’s lost interests. Without limiting the preceding, CCO may seek to recover some or all of the following from the Condemning Entity:
16 \\Rosenet\rosenetdfs\CITY ATTORNEY\CYCOM\WPDOCS\D001\P005\00062003.DOCX (1) compensation for its lost advertising income, for the value of the Digital Billboard, for lost goodwill, and for its interest in this Sublease; and
(2) financial assistance for relocating the Digital Billboard.

10. Indemnification.
(a) Definitions. The following definitions apply to this Section 10:
(1) “Person” is to be interpreted broadly. It includes not just third persons but also CCO and CCO’s directors, officers, employees, contractors, and agents; and the City and theCity’s elected officials, officers, employees, contractors, and agents. (2) “Liabilities” means all liabilities, claims, demands, damages, and costs (including reasonable attorneys’ fees and litigation costs through final resolution on appeal) that arise directly or indirectly from CCO’s acts or omissions or that of its employees, agents or contractors with respect to CCO’s possession or use of the Premises. (3) “Occurrence” means (A) the death of, or injury to, any Person; and (B) damage to, or destruction of, any real property, personal property (including intellectual property), or the environment (broadly interpreted to include the air, soil, soil vapor, surface water, groundwater, flora, and fauna on or about the Premises). (4) “Secured Area” means the portion of the Premises enclosed by the permanent security fence that CCO erects around the Digital Billboard in accordance with Section 6(f). (b) General Indemnity. CCO shall indemnify, defend (with attorneys reasonably acceptable to the City), protect, and hold the City and the City’s property (including the Premises) and the Landlord harmless from and against all Liabilities that arise directly or indirectly from CCO’s possession or use (including but not limited to, construction, maintenance, repair, and operation of the Digital Billboard) of the Premises. CCO is obligated under this Section 10(b) even if the City or the City’s elected officials, officers, employees, contractors, or agents reviewed, accepted, or approved the work, materials, or activities from which the Liabilities arise. But CCO is not obligated under this Section 10(b) to the extent the Liabilities are caused by the negligence or willful misconduct of the City or the City’s elected officials, officers, employees, contractors, or agents. CCO’s obligation under this Section 10(b) includes Liabilities arising from any of the following:
(1) Any Occurrence on the Premises and outside the Secured Area, but only to the extent resulting from CCO’s acts or omissions.
(2) Any Occurrence inside the Secured Area but only to the extent resulting from CCO’s acts or omissions.
(3) Any Occurrence caused or allegedly caused by (A) any condition of the Premises created by CCO or by any Person on the Premises with CCO’s permission; or (B) some act or omission on the Premises by CCO or by any Person on the Premises with CCO’s permission.
17 \\Rosenet\rosenetdfs\CITY ATTORNEY\CYCOM\WPDOCS\D001\P005\00062003.DOCX (4) Any Occurrence caused by, or related in any way to, work or activities performed on the Premises or materials furnished to the Premises at the request of CCO or any person or entity acting for CCO or with CCO’s permission.
(5) Any Occurrence that is caused by, or related in any way to, a verbal or non-verbal display on the Message Center, except to the extent of any material or content, if any, provided by the City or Landlord.
(c) Hazardous Substances. CCO shall indemnify, defend (with attorneys reasonably acceptable to the City), protect, and hold harmless the City; the City’s elected officials, officers, employees, and agents; and the City’s property (including the Premises) from and against all Liabilitiesthat arise directly or indirectly from either of the following:
(1) The possession, use, generation, transportation, release, threatened release, handling, storage, or disposal by CCO or CCO’s contractors of any Hazardous Substance on orunder the Premises or Secured Area during the Term or during CCO’s removal of the Digital Billboard in accordance with Section 6(l).
(2) The possession, use, generation, transportation, release, threatened release, handling, storage, or disposal by anyone under CCO’s direction or control other than the City or the City’s elected officials, officers, employees, contractors, or agents of any Hazardous Substance on or under the Secured Area during the Term or during CCO’s removal of the Digital Billboard in accordance with Section 6(l). CCO is not obligated under this Section 10(c)(2) for any Hazardous Substance that existed on or under the Premises or Secured Area on or before the Effective Date unless CCO’s intentional, negligent, or willful misconduct causes or exacerbates a release of the Hazardous Substance. (d) Legal Challenges. CCO shall indemnify, defend (with attorneys reasonably acceptable to the City), protect, and hold harmless the City and the City’s elected officials, officers, and employees in any litigation (including litigation based on the California Environmental Quality Act) brought to challenge the validity of this Sublease, the validity of the City Permits or the Caltrans Permits, or the validity of the City ordinances that authorize the installation and operation of the Digital Billboard on the Premises (each, a “Claim”). CCO’s obligation to indemnify under this Section 10(d) includes liability for reasonable attorneys’ fees awarded to a party who successfully challenges the validity of this Sublease, of the City Permits or the Caltrans Permits, or of any authorizing ordinance. If such a Claim is brought, the parties shall promptly notify the other party of such Claim and each party shall cooperate with the efforts of the CCO to defend such Claim. The City will not voluntarily assist the opposing party in any such Claim or take any position adverse to CCO in connection with such Claim. In the event of a Claim, CCO shall be entitled, in its sole discretion, to return the Digital Billboard faces to traditional static sign face or faces or remove the sign. If CCO exercises such right, CCO shall not be required to pay the City the Annual Rent on such sign from and after the date that the faces are converted to traditional sign faces and the City shall not be entitled to claim any lost revenues or damages against CCO as a result of such election by CCO and CCO shall be relieved of its obligation to display City Messages under this Agreement.
(e) Survival. CCO’s obligations under this Section 10 will survive this Sublease. 18 \\Rosenet\rosenetdfs\CITY ATTORNEY\CYCOM\WPDOCS\D001\P005\00062003.DOCX

11. Insurance.
(a) Types of Policies. During the Term and during CCO’s removal of the Digital Billboard in accordance with Section 6(l), at no cost to the City, CCO shall procure and maintain the following insurance policies covering CCO’s operations with respect to its possession and use of the Premises:
(1) A policy of comprehensive general-liability insurance providing coverage at least as broad as that provided by ISO Form CG 00 01. This policy must:
(A) be issued on an occurrence basis;
(B) include coverage for premises, operations, products and completed operations, advertising injury, and contractual liability;
(C) have a limit of at least $5,000,000 for each occurrence and five million in the aggregate;
(D) include a fire legal-liability limit of $50,000 for each occurrence; and (E) name the City and the City’s elected officials, officers, employees, and agents, and the Landlord as additional insureds with regard to general liability arising out of activities performed by CCO or on CCO’s behalf, including coverage for productsand-completed operations to include coverage for operations on property CCO owns, subleases, or uses (including the Premises and the Digital Billboard). (2) A policy of automobile-liability insurance providing coverage at least as broad as that provided by ISO Form CA 00 01. This policy must (A) have a combined single limit of at least $1,000,000 for each occurrence; and (B) cover owned, non-owned, and hired vehicles.
(3) A policy of fire-and-casualty insurance that insures the Digital Billboard for its full replacement value against damage or destruction by fire or by any of the perils commonly covered under the standard extended-coverage endorsement to fire-insurance policies issued on real property in Placer County.
(4) A policy of workers-compensation insurance with limits at least equal to those required by California law and including employer-liability insurance with a limit of at least $1,000,000. This policy must include a waiver of subrogation against the City. As an alternative to this policy, and subject to approval by the City’s Risk Management Division, CCO may provide the City with a copy of CCO’s Certificate of Consent to Self-Insure from the California Department of Industrial Relations and a certificate showing CCO’s excess-insurance limits and self-insured retentions.
(b) Insurer Qualifications. Each policy must be issued by an insurer the California Department of Insurance has authorized to transact business in California in the relevant line of insurance, and the insurer must have a rating of at least “A” by A.M. Best Company or a rating the City’sRisk Management Division determines to be substantially equivalent. 19 \\Rosenet\rosenetdfs\CITY ATTORNEY\CYCOM\WPDOCS\D001\P005\00062003.DOCX (c) Evidence of Insurance. CCO shall submit a certificate evidencing such coverage in a form satisfactory to the City Attorney of City, prior to exercising any rights hereunder. CCO shall also provide a separate endorsement form or section of the policy showing City, its officers, agents and employees, and Landlord as additional named insureds for each type of coverage, except for Workers’ Compensation. Such insurance shall specifically cover the contractual liability of CCO. The coverage shall be primary as to such additional insureds and no coverage of the City shall be called upon to contribute to a loss with respect to the liabilities assumed by CCO under this Agreement. In addition, the insurance policy may not contain language which prohibits additional insureds or other insurers from satisfying the self-insured retention or deductible. CCO shall provide thirty (30) days written notice to City prior to cancellation or material modification of any insurance required by this Agreement. CCO shall furnish a certificate and any renewal certificates as necessary, for the period covered by this Agreement.

Any insurance written on a claims made basis is subject to the prior approval of the City Attorney. Insurance coverage in the minimum amounts set forth herein shall not be construed to relieve CCO of liability in excess of such coverage, nor shall it preclude City from taking such other actions as are available to it under any other provisions of this Agreement or law. Any self-insured retentions must be declared on the certificate of insurance and approved by City in writing.
(d) Notice. Each of the policies must obligate the insurer to give the City at least thirty (30) days’ advance written notice before the policy is cancelled or materially changed. (e) Other Requirements. The general-liability and automobile-liability policies must each:
(1) With respect to the liabilities assumed by CCO under this Agreement, provide thatCCO’s insurance coverage is primary insurance with respect to the City and the City’s elected officials, officers, employees, and agents; and
(2) provide that CCO’s insurance applies separately to each insured against whom a claim is made or a suit brought, except with respect to the applicable policy limits. (f) Quinquennial Review. The City may reasonably revise these insurance requirements every five (5) years if the City reasonably determines that revision is needed to conform the policy terms, conditions, and limits with then-current insurance-industry standards for structures and real property comparable to the Digital Billboard and the Premises. A revision will take effect thirty (30) days after the City gives CCO notice in accordance with Section 12(c). (g) No Limit on Indemnification. Nothing in this Section 11 limits CCO’s obligations underSection

10. (h) Ground Lease. The parties acknowledge that under the Ground Lease that City is obligated to require CCO to indemnify and insure Landlord, and therefore this Section 10 shall be interpreted broadly to ensure full compliance with the Ground Lease.

12. Miscellaneous.
(a) Assignments and Subleases. A party may not assign or otherwise transfer this Sublease or any interest in it, and this Sublease is not assignable by operation of law, without the other party’s prior written consent, which the other party shall not withhold, delay, or condition unreasonably.

An assignment or transfer of this Sublease does not occur, for purposes of this Section 12(a), if 20 \\Rosenet\rosenetdfs\CITY ATTORNEY\CYCOM\WPDOCS\D001\P005\00062003.DOCX CCO merges with another company, reorganizes its stock, or undergoes a similar corporate restructuring, or if CCO sells any of its assets or stock. CCO may not sublease the Premises or any part of the Premises, or the Digital Billboard or any part of the Digital Billboard, without the City’s prior written consent, which the City may withhold or condition in its sole discretion. An attempted assignment, transfer, or sublease made contrary to this Section 12(a) is void. (b) Successors and Assigns. This Sublease binds and inures to the benefit of the successors and assigns of the parties. This Section 12(b) does not constitute the City’s consent to any assignment of this Sublease or any interest in the Sublease, or to any Sublease of the Premises or any part of the Premises, or to any sublease of the Digital Billboard or any part of the Digital Billboard.
(c) Notices. Any notice or other communication under this Sublease must be in writing and will be considered properly given and effective only when mailed or delivered in the manner provided by this Section 12(c) to the persons identified below. A mailed notice or other communication will be effective or will be considered to have been given on the third day after it is deposited in the United States Mail (certified mail and return receipt requested), addressed as set forth below, with postage prepaid. A notice or other communication sent in any other manner will be effective or will be considered properly given when actually delivered. A party may change its address for these purposes by giving written notice of the change to the other party in the manner provided in this Section 12(c).

If to the City:

City of Roseville
Roseville Civic Center
311 Vernon Street
Roseville, California 95678
Attn: City Manager
If to CCO:

Clear Channel Outdoor, LLC
401 Slobe Avenue
Sacramento, California 95815
Attn: President – Sacramento Division
(d) The City’s Right to Enter and Inspect the Premises. The City and the City’s elected officials, officers, employees, and agents may enter upon and inspect the Premises at any time to determine CCO’s compliance with this Sublease provided that such entry shall not unreasonably interfere with CCO’s operations on the Premises.
(e) Force Majeure.
(1) “Force Majeure Event” means a cause of delay that is not the fault of the party who is required to perform under this Sublease and is beyond that party’s reasonable control, including the elements (including floods, earthquakes, windstorms, and unusually severe weather), fire, energy shortages or rationing, riots, acts of terrorism, war or war-defense conditions, acts of any public enemy, epidemics, pandemics, the actions or inactions of any governmental entity (excluding the City) or that entity’s agents, litigation, labor shortages (including shortages caused by strikes or walkouts), and materials shortages. (2) Except as otherwise expressly provided in this Sublease, if the performance of any act required by this Sublease to be performed by either the City or CCO is prevented or delayed because of a Force Majeure Event, then the time for performance will be extended for a period equivalent to the period of delay, and performance of the act during the period of delay will be excused.
21 \\Rosenet\rosenetdfs\CITY ATTORNEY\CYCOM\WPDOCS\D001\P005\00062003.DOCX (3) This Section 12(e) does not excuse (A) CCO’s obligation to pay Annual Rent when due and payable, except as otherwise provided in Subsection 4(c)(4); or (B) either party’s obligation to perform an act when performance is rendered difficult or impossible solely because of that party’s financial condition.
(f) Waiver of Breach. A party’s failure to insist on strict performance of this Sublease or to exercise any right or remedy upon the other party’s breach of this Sublease will not constitute a waiver of the performance, right, or remedy. A party’s waiver of the other party’s breach of any provision in this Sublease will not constitute a continuing waiver or a waiver of any subsequent breach of the same or any other provision. A waiver is binding only if set forth in writing and signed by the waiving party.
(g) Relationship of the Parties. This Sublease does not create any relationship or association between the City and CCO other than that of landlord and tenant. For example, and without limiting the previous sentence, this Sublease does not create between the City and CCO the relationship of principal and agent, nor does it create a partnership or joint venture. (h) Attorney’s Fees. The party prevailing in any litigation concerning this Sublease, the Premises, or any improvements to the Premises (including the Digital Billboard) will be entitled to an award by the court of reasonable attorneys’ fees and litigation costs through final resolution on appeal in addition to any other relief that may be granted in the litigation. If the City is the prevailing party, then this Section 12(h) will apply whether the City is represented in the litigation by the Office of the City Attorney or by outside counsel.
(i) Severability. If a court with jurisdiction holds any nonmaterial provision of this Sublease to be invalid, void, or unenforceable, then the remaining provisions will remain in full force. (j) Counterparts. The parties may execute this Sublease in counterparts, each of which will be considered an original, but all of which will constitute the same Sublease. (k) Memorandum of Sublease. The City and CCO shall cooperate in good faith and without liability to execute and record with the Placer County Recorder’s Office, a memorandum of sublease, using the form set forth as Exhibit D, and a memorandum of ground lease, using the form set forth as Exhibit E. CCO shall promptly provide City with a copy of the recorded Sublease. City shall promptly provide CCO with a copy of the recorded Ground Lease. (l) Further Assurances. Each party shall execute all additional documents or instruments and take all necessary action that either party reasonably considers necessary to carry out the proper purposes of this Sublease.
(m) Time of Essence. Time is of the essence of this Sublease. (n) Interpretation. This Sublease is to be interpreted and applied in accordance with California law without regard to conflict-of-laws principles, except that the rule of interpretation in California Civil Code section 1654 will not apply.
(o) Integration and Modification. This Sublease sets forth the parties’ entire understanding regarding the matters addressed. It supersedes all prior or contemporaneous agreements, 22 \\Rosenet\rosenetdfs\CITY ATTORNEY\CYCOM\WPDOCS\D001\P005\00062003.DOCX representations, and negotiations (written, oral, express, or implied) and may be modified only by another written agreement signed by both parties.

13. List of Exhibits. All exhibits referenced below are incorporated herein and made a part of this Agreement.

Exhibit A – Property Description of Premises
Exhibit B-1 – Digital Billboard Message Center Operating Requirements Exhibit B-2 – Digital Billboard Design
Exhibit C – Hazardous Substances
Exhibit D – Form of Memorandum of Sublease
Exhibit E – Form Memorandum of Ground Lease
[SIGNATURE BLOCKS APPEAR ON FOLLOWING PAGE]

24 \\Rosenet\rosenetdfs\CITY ATTORNEY\CYCOM\WPDOCS\D001\P005\00062003.DOCX

EXHIBIT A
Property Description

LEASED PROPERTY AREA

ALL THAT CERTAIN REAL PROPERTY SITUATED IN THE CITY OF ROSEVILLE, COUNTY OF PLACER AND STATE OF CALIFORNIA DESCRIBED AS FOLLOWS:

BEING A PORTION OF PARCEL 2 AS SHOWN ON THAT CERTAIN MAP ENTITLED "PARCEL MAP OF CONFERENCE DRIVE (N.C.R.S.P. PARCEL 40(a)), SUBDIVISION NO. 000166 FILED FOR RECORD ON NOVEMBER 6, 2013 IN BOOK 35 PARCEL MAPS AT PAGE 55, PLACER COUNTY RECORDS AND BEING MORE PARTICULARLY DESCRIBED AS FOLLOWS:

BEGINNING AT THE NORTHWEST CORNER OF SAID PARCEL 2, THENCE ALONG THE NORTHERLY LINE OF PARCEL 2, SOUTH 57°55'56" EAST FOR A DISTANCE OF 65.00 FEET;
THENCE LEAVING SAID NORTHERLY LINE, SOUTH 32°04'04" WEST FOR A DISTANCE OF

55.00 FEET;
THENCE NORTH 57°55'56" WEST FOR A DISTANCE OF 65.00 FEET TO THE WESTERLY LINE OF PARCEL 2;
THENCE ALONG SAID WESTERLY LINE NORTH 32°04'04" EAST FOR A DISTANCE OF 55.00 FEET TO THE POINT OF BEGINNING.

CONTAINING A TOTAL AREA OF 3,575 SQUARE FEET MORE OR LESS. 25 Sublease for Digital Billboard: Exhibit B
EXHIBIT B-1
Digital Billboard Message Center Operating Requirements Operating Parameters:
(a) The billboard message center will include no special visual effects that include moving or flashing lights that accompany the transition between two successive messages, and no special visual effects shall accompany any message display; and
(b) CCO is required to report to the City its intention of installing, implementing or using any technology that would allow interaction with drivers, vehicles or any device located in vehicles, including, but not limited to a radio frequency identification device, global positioning system (GPS), or other device, a minimum of thirty (30) days in advance of such operation, and shall not proceed with such operation until approved by the City, which approval shall not be unreasonably withheld, conditioned or delayed. Such approval is not required in the event such technology is installed, implemented or used at the request of law enforcement.
(c) A message on a message center may have a minimum display time of eight (8) seconds and a maximum change interval of two (2) seconds.
(d) The Message center sign shall be operated with systems and monitoring in place to either turn the display off, show a “full black” image or freeze the image on the display in one position in the event of a malfunction.
(e) Digital billboards shall not operate at brightness levels of more than 0.3 foot candles above ambient light, as measured using a foot candle meter at a pre-set distance. Distances to measure the foot candles impact vary with the expected viewing distances of each size sign. Measurement distance criteria:

Nominal Distance to
Face Size be measured from:
12’ x 25’ 150'
10'6” x 36’ 200'
14’ x 48’ 250'
20’ x 60’ 350'
Digital Billboards must have a light sensing device that will adjust the brightness as ambient light conditions change.
(f) CCO has the exclusive option to remove the Digital Display Areas from the Digital Billboard at any time and replace them with traditional static sign faces at its sole option and without reduction in Annual Rent.

Sublease for Digital Billboard: Exhibit B
EXHIBIT B-2
Digital Billboard Design
Sublease for Digital Billboard: Exhibit C Page 1 of 2
Exhibit C
Hazardous Substances
As used in this Exhibit C, “Environmental Laws” means any statute, ordinance, regulation, rule, order, decree, or other law or requirement that is enacted, promulgated, or issued by any federal, state, or local government entity (whether before, on, or after the Effective Date) and:
• regulates, relates to, or imposes liability or standards of conduct concerning any Hazardous Substance (defined below);
• regulates land use or regulates or protects the environment, including air, soil, soil vapor, surface water, groundwater, flora, or fauna; or
• pertains to occupational health or industrial hygiene or to occupational or environmental conditions on, under, or about the Premises.

Without limiting the generality of the foregoing, “Environmental Laws” includes the Comprehensive Environmental Response, Compensation and Liability Act of 1980 (CERCLA) (42 U.S.C. § 9601 et seq.); the Resource Conservation and Recovery Act of 1976 (RCRA) (42 U.S.C. § 6901 et seq.); the Clean Water Act, also known as the Federal Water Pollution Control Act (FWPCA) (33 U.S.C. § 1251 et seq.); the Toxic Substances Control Act (TSCA) (15 U.S.C. § 2601 et seq.); the Hazardous Materials Transportation Act (HMTA) (49 U.S.C. § 1801 et seq.); the Insecticide, Fungicide, and Rodenticide Act (7 U.S.C. § 136 et seq.); the Superfund Amendments and Reauthorization Act (SARA) (42 U.S.C. § 6901 et seq.); the Clean Air Act (42 U.S.C. § 7401 et seq.); the Safe Drinking Water Act (42 U.S.C. § 300f et seq.); the Solid Waste Disposal Act (42 U.S.C. § 6901 et seq.); the Emergency Planning and Community Right to Know Act (42 U.S.C. § 11001 et seq.); the Occupational Safety and Health Act (OSHA) (29 U.S.C. §§ 655 and 657); the California Underground Storage of Hazardous Substance Act (Cal. Health & Saf. Code, § 25280 et seq.); the California Hazardous Waste Control Act (Cal. Health & Saf. Code, § 25100 et seq.); the California Safe Drinking Water and Toxic Enforcement Act (Cal.

Health & Saf. Code, § 24249.5 et seq.); and the Porter-Cologne Water Quality Act (Cal. Water Code, § 13000 et seq.), together with any amendments of these statutes and regulations promulgated under them (whether enacted or promulgated before, on, or after the Effective Date).

For purposes of this Sublease, “Hazardous Substance” means:
(1) any substance defined as a “hazardous substance,” “hazardous material,” “hazardouswaste,” “toxic substance,” “toxic waste,” “solid waste,” “pollutant,” or “contaminant” under Environmental Laws (defined above);
(2) any substance listed as hazardous substances in 49 C.F.R. § 172.101 or its successor by the U.S.

Department of Transportation or in 40 C.F.R. Part 302 or its successor by the U.S.

Environmental Protection Agency;
(3) any other substance, material, or waste that is or becomes regulated or classified as hazardous or toxic under Environmental Laws (defined above);
Sublease for Digital Billboard: Exhibit C Page 2 of 2
(4) any material, waste, or substance that is (a) a petroleum or refined petroleum product, (b) asbestos or asbestos-containing materials, (c) polychlorinated biphenyl, (d) designated as a hazardous substance under 33 U.S.C. § 1321 or its successor or listed under 33 U.S.C. § 1317 or its successor, (e) a flammable explosive, (f) a radioactive material, or (g) a lead-based paint; (5) any substance listed by the State of California under subdivision (a) of California Health and Safety Code section 25249.8, as amended, or under any successor to that statute, as a chemical known by the state to cause cancer or reproductive toxicity; (6) any material that, because of its characteristics or interaction with one or more other substances, chemical compounds, or mixtures, threatens to damage health, safety, or the environment or is required by any law or public agency to be remediated;
(7) any material that, if present, would require remediation under the guidelines set forth in California’s Leaking Underground Fuel Tank Field Manual, regardless of whether the presence of the material resulted from a leaking underground fuel tank; (8) any pesticide regulated under the federal Insecticide, Fungicide, and Rodenticide Act (7 U.S.C. §136 et seq.) or its successor;
(9) any material regulated under the federal Occupational Safety and Health Act (29 U.S.C. § 651 et seq.) or California’s Occupational Safety and Health Act (Health & Saf. Code, § 63000 et seq.), or their successors;
(10) any material regulated under the federal Clean Air Act (42 U.S.C. 7401 et seq.) or under division 26 of the California Health and Safety Code, or their successors; (11) any material that qualifies as an “extremely hazardous waste,” “hazardous waste,” or “restricted hazardous waste” under section 25115, 25117, or 25122.7 of the California Health and Safety Code, or as “medical waste” under section 25281, 25316, 25501, 25501.1, 25023.2, or 39655 of the California Health and Safety Code, or their successors; and (12) any material listed or defined as a “hazardous waste,” “extremely hazardous waste,” or an “acutely hazardous waste” under chapter 11 of title 22 of the California Code of Regulations or any successor to that chapter.
3 EXHIBIT D

FORM OF MEMORANDUM OF SUBLEASE
4 WHEN RECORDED MAIL TO:

CLEAR CHANNEL OUTDOOR, LLC
2325 East Camelback Road, Suite 400
Phoenix, Arizona 85016
Legal Department
THE UNDERSIGNED GRANTOR DECLARES:

DOCUMENTARY TRANSFER TAX IS $0.00 CITY TRANSFER TAX IS $0.00 This conveyance is exempt from the documentary transfer tax since the lease term is less than 35 years, R&T Code §61, 11911.

MEMORANDUM OF SUBLEASE
THIS MEMORANDUM OF SUBLEASE (this “Memorandum”) is made by and between the City of Roseville (“Landlord”), whose address is 311 Vernon Street in Roseville, CA 95678 and Clear Channel Outdoor, Inc., a Delaware limited liability corporation (“Tenant”), whose address is 401 Slobe Avenue in Sacramento, CA 95815, upon the following terms:

1. Landlord is the leaseholder of the Premises (as defined below).

2. Landlord and Tenant have entered into that certain unrecorded Sublease Agreement, dated (the “Sublease”) wherein Tenant has leased the Premises for the construction, maintenance, and operation of its outdoor advertising structures for a term beginning , and continuing for a maximum period of twenty (20) years, excluding extensions and renewals, if any.

3. This Memorandum is made upon all the terms and conditions of the Sublease on file with the City Clerk of the City of Roseville, and all of said terms and conditions are incorporated by reference herein.

Premises: 290 Conference Center Drive in Roseville, CA 95678

LEGAL DESCRIPTION IS ATTACHED AS EXHIBIT A
The purpose of this Memorandum is to give record notice of the Sublease and of the rights created thereby, all of which are hereby confirmed.
[SIGNATURE BLOCKS APPEAR ON FOLLOWING PAGE]

6 Exhibit A
to Memorandum of Sublease
Legal Description of Premises

LEASED PROPERTY AREA

ALL THAT CERTAIN REAL PROPERTY SITUATED IN THE CITY OF ROSEVILLE, COUNTY OF PLACER AND STATE OF CALIFORNIA DESCRIBED AS FOLLOWS:

BEING A PORTION OF PARCEL 2 AS SHOWN ON THAT CERTAIN MAP ENTITLED "PARCEL MAP OF CONFERENCE DRIVE (N.C.R.S.P. PARCEL 40(a)), SUBDIVISION NO. 000166 FILED FOR RECORD ON NOVEMBER 6, 2013 IN BOOK 35 PARCEL MAPS AT PAGE 55, PLACER COUNTY RECORDS AND BEING MORE PARTICULARLY DESCRIBED AS FOLLOWS:

BEGINNING AT THE NORTHWEST CORNER OF SAID PARCEL 2, THENCE ALONG THE NORTHERLY LINE OF PARCEL 2, SOUTH 57°55'56" EAST FOR A DISTANCE OF 65.00 FEET;
THENCE LEAVING SAID NORTHERLY LINE, SOUTH 32°04'04" WEST FOR A DISTANCE OF

55.00 FEET;
THENCE NORTH 57°55'56" WEST FOR A DISTANCE OF 65.00 FEET TO THE WESTERLY LINE OF PARCEL 2;
THENCE ALONG SAID WESTERLY LINE NORTH 32°04'04" EAST FOR A DISTANCE OF 55.00 FEET TO THE POINT OF BEGINNING.

CONTAINING A TOTAL AREA OF 3,575 SQUARE FEET MORE OR LESS. 7 EXHIBIT E

FORM OF MEMORANDUM OF GROUND LEASE
WHEN RECORDED MAIL TO:

City of Roseville
311 Vernon Street
Roseville, CA 95678
Attn: City Clerk
Exempt from recording fees
Pursuant to Gov’t Code § 27383
Space Above Line For Recorder's Use
THE UNDERSIGNED GRANTOR DECLARES:

DOCUMENTARY TRANSFER TAX IS $0.00 CITY TRANSFER TAX IS $0.00 This conveyance is exempt from the documentary transfer tax since the lease term is less than 35 years, R&T Code §61, 11911.

MEMORANDUM OF GROUND LEASE
THIS MEMORANDUM OF GROUND LEASE (this “Memorandum”) is made by and between ROSEVILLE JUNCTION, LLC, (“Landlord”), whose address is 290 Conference Center Drive in Roseville, CA 95678 and the CITY OF ROSEVILLE, a California municipal corporation (“Tenant”), whose address is 311 Vernon Street in Roseville, CA 95678, upon the following terms:

1. Landlord is the owner of the Premises (as defined below).

2. Landlord and Tenant have entered into that certain unrecorded Ground Lease Agreement, dated (the “Lease”) wherein Tenant has leased the Premises for the construction, maintenance, and operation of its outdoor advertising structures for a term beginning , and continuing for a maximum period of twenty (20) years, excluding extensions and renewals, if any.

3. Under the Lease, Tenant has a right of first refusal with respect to the Premises on termsset forth therein.

4. This Memorandum is made upon all the terms and conditions of the Lease on file with the City Clerk of the City of Roseville, and all of said terms and conditions are incorporated by reference herein.

Premises: 290 Conference Center Drive in Roseville, CA 95678

LEGAL DESCRIPTION IS ATTACHED AS EXHIBIT A
The purpose of this Memorandum is to give record notice of the Lease and of the rights created thereby, all of which are hereby confirmed.
[SIGNATURE BLOCKS APPEAR ON FOLLOWING PAGE]
IN WITNESS WHEREOF, upon the day and year first hereinabove written, the respective Parties hereto have executed this Memorandum of Ground Lease, personally or by officers or agents thereunto duly authorized.
"LANDLORD":

ROSEVILLE JUNCTION, LLC,
a Delaware limited liability company
By:

Name:

Title:
[Notarization Required]
"TENANT":

CITY OF ROSEVILLE, a municipal corporation:

By

DOMINICK CASEY
City Manager
[Notarization Required]
Exhibit A
to Memorandum of Ground Lease
Legal Description of Premises

LEASED PROPERTY AREA

ALL THAT CERTAIN REAL PROPERTY SITUATED IN THE CITY OF ROSEVILLE, COUNTY OF PLACER AND STATE OF CALIFORNIA DESCRIBED AS FOLLOWS:

BEING A PORTION OF PARCEL 2 AS SHOWN ON THAT CERTAIN MAP ENTITLED "PARCEL MAP OF CONFERENCE DRIVE (N.C.R.S.P. PARCEL 40(a)), SUBDIVISION NO. 000166 FILED FOR RECORD ON NOVEMBER 6, 2013 IN BOOK 35 PARCEL MAPS AT PAGE 55, PLACER COUNTY RECORDS AND BEING MORE PARTICULARLY DESCRIBED AS FOLLOWS:

BEGINNING AT THE NORTHWEST CORNER OF SAID PARCEL 2, THENCE ALONG THE NORTHERLY LINE OF PARCEL 2, SOUTH 57°55'56" EAST FOR A DISTANCE OF 65.00 FEET;
THENCE LEAVING SAID NORTHERLY LINE, SOUTH 32°04'04" WEST FOR A DISTANCE OF

55.00 FEET;
THENCE NORTH 57°55'56" WEST FOR A DISTANCE OF 65.00 FEET TO THE WESTERLY LINE OF PARCEL 2;
THENCE ALONG SAID WESTERLY LINE NORTH 32°04'04" EAST FOR A DISTANCE OF 55.00 FEET TO THE POINT OF BEGINNING.

CONTAINING A TOTAL AREA OF 3,575 SQUARE FEET MORE OR LESS.

1 Roseville Digital Billboard Project
Initial Study/Mitigated Negative Declaration
Responses to Public Comments
January 3, 2022
This Response to Comments document contains comments received during the public review period for the Roseville Digital Billboard Project (proposed project) Initial Study/Mitigated Negative Declaration (IS/MND). The City of Roseville, as lead agency, released the IS/MND for public review beginning on November 19, 2021 and ending on December 20, 2021 pursuant to CEQA Guidelines Section 15105.

According to CEQA Guidelines Sections 15073 and 15074, the lead agency must consider the comments received during consultation and review periods together with the IS/MND. However, unlike with an Environmental Impact Report, comments received on an IS/MND are not required to be attached to the negative declaration, nor must the lead agency make specific written responses to public agencies. Nonetheless, the lead agency has chosen to provide responses to those specific public comments that are related to the environmental analysis contained in the IS/MND. Nonenvironmental comments have been considered by the City as part of staff’s report to the City Council.

COMMENTS AND RESPONSES
The City of Roseville received two comment letters during the open comment period on the IS/MND for the proposed project. The following section includes responses to each of the comment letters, insofar as the comments address environmental topics. The letters are numbered and environmental-related comments are bracketed with assigned comment numbers. The bracketed comment letters are followed by numbered responses corresponding to each bracketed comment. 2 Letter 1
1-1
1-2
3 Letter 1
cont’d
1-2
cont’d
4 Letter 1
cont’d
1-2
cont’d
5 Letter 1
cont’d
1-2
cont’d
6 Letter 1
cont’d
1-2
cont’d
1-3
7 LETTER 1: GREG HENDRICKS, CENTRAL VALLEY REGIONAL WATER QUALITY BOARD, DECEMBER 17, 2021
Response to Comment 1-1
The comment is an introductory statement and does not address the adequacy of the IS/MND.

Response to Comment 1-2
The comment provides background information regarding applicable regulations and required permits. The comment does not address the adequacy of the IS/MND, and has been noted for the record.

Response to Comment 1-3
The comment is a conclusion statement and does not address the adequacy of the IS/MND. 8 Letter 2
2-1
2-3
2-2
2-4
9 LETTER 2: ANNA M. STARKEY, UNITED AUBURN INDIAN COMMUNITY, DECEMBER 20, 2021 Response to Comment 2-1
The comment is an introductory statement and does not address the adequacy of the IS/MND.

Response to Comment 2-2
In response to the commenter’s concern, page 3-49 of the IS/MND is hereby revised to include the requested mitigation measure:
[…] Should buried or otherwise unknown tribal cultural resources be encountered and/or damaged during construction, a potentially significant impact would occur. However, implementation of Mitigation Measures TCR-1 and TCR-2 would reduce the potential impact to less than significant with mitigation incorporated.

3.2.18.2 Mitigation Measures
Mitigation Measure TCR-1: Implement Post Ground Disturbance Site Visit A minimum of seven days prior to beginning earthwork, clearing and grubbing, or other soil disturbing activities, the applicant shall notify lead agency of the proposed earthwork start-date. The lead agency shall contact the United Auburn Indian Community (UAIC) with the proposed earthwork start-date and a UAIC Tribal Representative or Tribal Monitor shall be invited to inspect the project site, including any soil piles, trenches, or other disturbed areas, within the first five days of groundbreaking activity, or as appropriate for the type and size of project. During this inspection, a UAIC Tribal Representative or Tribal Monitor may provide an on-site meeting for construction personnel information on TCRs and workers awareness brochure.

If any TCRs are encountered during this initial inspection, or during any subsequent construction activities, work shall be suspended within 100 feet of the find and the measures included in the Inadvertent/Unanticipated Discoveries Mitigation Measure shall be implemented. Preservation in place is the preferred alternative under CEQA and UAIC protocols, and every effort must be made to preserve the resources in place, including through project redesign.
• The contractor shall implement any measures deemed by CEQA lead agency to be necessary and feasible to preserve in place, avoid, or minimize significant effects to the resources, including the use of a paid Native American Monitor during ground disturbing activities.

Mitigation Measure TCR-1 TCR-2: Implement Measures to Protect Unanticipated Discoveries.

If subsurface deposits believed to be cultural or human in origin, or tribal cultural resources, are discovered during construction, all work shall halt within a 100-foot radius of the discovery, and the Construction Manager shall immediately notify the City of Roseville Development Services Director by phone […]
10 The aforementioned revision does not change the conclusions or analysis presented in the IS/MND, as Impacts XVIII a and b were determined to be less-than-significant with mitigation incorporated.

Response to Comment 2-3
Please refer to Response to Comment 2-2. The requested change would not result in any new or more severe impacts as compared to those already identified and addressed in the IS/MND. In addition, pursuant to CEQA Guidelines Section 15073.5, recirculation of the IS/MND is not warranted as the requested addition would not result in any substantial revisions to the proposed project.

Response to Comment 2-4
The comment is a conclusion statement and does not address the adequacy of the IS/MND.

Existing
CCO
Existing
OFM
Proposed
CCO
Proposed
CCO
Existing
CCO
Existing
CCO
Existing
CCO

HARDING
BLVD

DOUGLAS BLVD

TAYLOR RD

STANFORD

RANCH RD
Economic Development
Digital Billboard Project
S:\Arcdata\aware\EconDev_Billboards.mxd Date Saved: 4/14/2021 2:13:50 PM 0 0.125 0.25 0.5
Miles

LONETREE BLVD
Department: Economic Development
Date: March 22, 2021
RFP No. 04-20
for
Roseville Digital Billboard Project RFP
Evaluation
Criteria
"A"
Evaluation
Criteria
"B"
Evaluation
Criteria
"C"
Evaluation
Criteria
"D" Total
Ranking Company Name Score (after
weighting)
Percentage
Weighting
Score (after weighting) Percentage
Weighting
Score (after
weighting)
Percentage
Weighting
Score (after
weighting)
Percentage
Weighting
Score
1 Clear Channel Outdoor 19 20 19 20 27.75 30 29.5 30 95.25 2 Outfront Media 18 20 17.25 20 26.5 30 25.5 30 87.25
3 Marquee Media 17.5 20 17.75 20 24.5 30 25 30 84.75
4 Media Choice 14.5 20 14.5 20 22.5 30 21.25 30 72.75
5 Foster Interstate 15.75 20 14.5 20 21.625 30 18.5 30 70.375 Per Section 8, Evaluation Criteria of RFP #04-20 is listed as:

Evaluation Criteria "A" Experience and qualifications of firm and proposed staff/sub-consultants/sub-contractors (per Sections 6.3 - 6.5) Evaluation Criteria "B" Understanding of the project (per Section 6.6) Evaluation Criteria "C" Proposed project plan (per Section 6.7) Evaluation Criteria "D" Business proposal and financing plan (per Section 6.8)

NOTICE OF RFP

CITY OF ROSEVILLE, CA
Digital Billboard Project
Proposal Due Date: 02/12/2021 @ 3:00PM
Request for Proposal (RFP) specifications may be retrieved by accessing the City of Roseville website, www.roseville.ca.us, or by calling 916-774-5334, the Economic Development Department Phone Number.

Page 2 of 24 ends
← All documents from this meeting