Introduction
The Westbrook Parcel WB-41 Residential Development (project) is located south of Pleasant Grove Boulevard, between Santucci Boulevard and Daylight Drive in Roseville, California. The project is located within the Sierra Vista Specific Plan (SVSP). The project area and tentative subdivision map are provided as Figures 1 and 2, respectively.
Due to the proximity of the proposed residential uses to Pleasant Grove Boulevard and Santucci Boulevard, BAC was retained by the project applicant to prepare this assessment. Specifically, the purposes of this assessment are to quantify noise levels associated with traffic on those roadways, and to compare those levels against the applicable City of Roseville and Sierra Vista Specific Plan noise criteria for new residential uses.
Noise Fundamentals and Terminology
Noise is often described as unwanted sound. Sound is defined as any pressure variation in air that the human ear can detect. If the pressure variations occur frequently enough (at least 20 times per second), they can be heard, and thus are called sound. Measuring sound directly in terms of pressure would require a very large and awkward range of numbers. To avoid this, the decibel scale was devised. The decibel scale allows a million-fold increase in pressure to be expressed as 120 dB. Another useful aspect of the decibel scale is that changes in levels (dB) correspond closely to human perception of relative loudness. Appendix A contains definitions of Acoustical Terminology. Figure 3 shows common noise levels associated with various sources.
The perceived loudness of sounds is dependent upon many factors, including sound pressure level and frequency content. However, within the usual range of environmental noise levels, perception of loudness is relatively predictable, and can be approximated by weighing the frequency response of a sound level meter by means of the standardized A-weighing network.
There is a strong correlation between A-weighted sound levels (expressed as dBA) and community response to noise. For this reason, the A-weighted sound level has become the standard tool of environmental noise assessment. All noise levels reported in this section are in terms of A-weighted levels in decibels.
Community noise is commonly described in terms of the “ambient” noise level, which is defined as the all-encompassing noise level associated with a given noise environment. A common statistical tool to measure the ambient noise level is the average, or equivalent, sound level (Leq) over a given time period (usually one hour). The Leq is the foundation of the Day-Night Average Level noise descriptor, Ldn or DNL, and shows very good correlation with community response to noise.
Legend
0 200 Figure 1
Scale (Feet)
Project Area Boundary (Approximate)
Westbrook Parcel WB-41
Roseville, California
Project Area
100
Pleasant Grove Blvd
Santucci Blvd
Daylight Dr
Legend
0 100 Figure 2
Scale (Feet)
Project Area Boundary
Westbrook Parcel WB-41
Roseville, California
Tentative Subdivision Map
50 Masonry Walls
Bollard Acoustical Consultants, Inc. (BAC)
Environmental Noise Assessment
Westbrook Parcel WB-41 Residential Development – Roseville, California
Figure 3
Typical A-Weighted Sound Levels of Common Noise Sources The Day-Night Average Level (DNL) is based upon the average noise level over a 24-hour day, with a +10-decibel weighting applied to noise occurring during nighttime (10:00 p.m. to 7:00 a.m.) hours. The nighttime penalty is based upon the assumption that people react to nighttime noise exposures as though they were twice as loud as daytime exposures. Because DNL represents a 24-hour average, it tends to disguise short-term variations in the noise environment. DNL-based noise standards are commonly used to assess noise impacts associated with traffic, railroad, and aircraft noise sources.
Bollard Acoustical Consultants, Inc. (BAC)
Environmental Noise Assessment
Westbrook Parcel WB-41 Residential Development – Roseville, California
Criteria for Acceptable Noise Exposure
City of Roseville General Plan 2035
The Noise Element of the Roseville General Plan 2035 contains goals and policies intended to protect city residents from the harmful and annoying effects of exposure to excessive noise.
The General Plan policies which would be applicable to this project are reproduced below:
Transportation Noise Sources
Policy 1 Allow the development of new noise-sensitive land uses (which include but are not limited to residential, schools, and hospitals) only in areas exposed to existing or projected levels of noise from transportation noise sources which satisfy the levels specified in Table 1. Noise mitigation measures may be required to reduce noise in outdoor activity areas and interior spaces to the levels specified in Table 1.
Recognizing that in increasingly urban areas it is difficult to maintain suburban noise standards, and in order to facilitate the City’s goals to encourage reinvestment and economic development in the Riverside and Downtown Specific Plan areas, the City may elect to allow new noise-sensitive land uses on a case by case basis in proximity to transportation sources. Noise mitigation, including an acoustical analysis, would be required to reduce interior space noise levels to the standards specified in Table 1. Exterior noise levels would require mitigation to the extent feasible using building orientation, construction, and design features; however ultimately, noise levels may exceed the noise standards identified in Table 1.
Policy 2 Require new roadway improvement projects to be mitigated so as not to exceed the noise levels specified in Table 1 at outdoor activity areas or interior spaces of existing noise-sensitive land uses.
Policy 3 Evaluate new transportation projects, such as light and heavy rail, using the standards contained in Table 1. However, noise from these projects may be allowed to exceed the standards contained in Table 1 if the City Council finds that there are special overriding circumstances.
Policy 4 Require an acoustical analysis where:
a. Noise sensitive land uses are proposed in areas exposed to existing or projected noise levels exceeding the levels specified in Table 1; b. Proposed transportation noise source projects are likely to produce noise levels exceeding the levels specified in Table 1 at existing or planned noisesensitive uses.
Bollard Acoustical Consultants, Inc. (BAC)
Environmental Noise Assessment
Westbrook Parcel WB-41 Residential Development – Roseville, California
An acoustical analysis shall be required as part of the environmental review process so that noise mitigation may be considered in the project design.
Table 1
Maximum Allowable Noise Exposure - Transportation Noise Sources City of Roseville General Plan Noise Element
Land Use
Outdoor Activity Areas1 Interior Spaces
DNL/CNEL, dB DNL/CNEL, dB Leq, dB2
Residential 603 45 --
Transient lodging 603 45 --
Hospitals, nursing homes 603 45 --
Theaters, auditoriums, music halls -- -- 35
Churches, meeting halls 603 -- 40
Office buildings 65 -- 45
Schools, libraries, museums -- -- 45
Playgrounds, neighborhood parks 70 -- --
1 Outdoor activity areas for residential developments are considered to be the backyard patios or decks of single-family dwelling, and the patios or common areas where people generally congregate for multi-family development.
Outdoor activity areas for non-residential developments are considered to be those common areas where people generally congregate, including pedestrian plazas, seating areas and outside lunch facilities.
Where the location of outdoor activity areas is unknown, the exterior noise level standard shall be applied to the property line of the receiving land use.
2 As determined for a typical worst-case hour during periods of use. 3 Where it is not possible to reduce noise in outdoor activity areas to 60 dB Ldn/CNEL or less using a practical application of the best-available noise reduction measures, an exterior noise level of up to 75 dB Ldn/CNEL may be allowed provided that available exterior noise level reduction measures have been implemented and interior noise levels are in compliance with this table.
Note: Where a proposed use is not specifically listed on this table, the use shall comply with the noise exposure standards for the nearest similar use as determined by the Planning Department. Commercial and industrial uses have not been listed because such uses are not considered to be particularly sensitive to noise exposure. -- = not applicable
DNL = Day-Night Average Sound Level
CNEL = Community Noise Equivalent Level
dB = Decibels
Leq = Noise Equivalent Level
Source: City of Roseville General Plan Noise Element
Sierra Vista Specific Plan Final EIR
The Sierra Vista Specific Plan (SVSP) Final EIR (May 2010) contains mitigation measures intended to protect future city residents from the harmful and annoying effects of exposure to excessive noise. The transportation noise related mitigation measures of the specific plan are reproduced below:
WMM 4.5-8 On-site Traffic Noise Attenuation (Impact 4.6-6 SVSP and Urban Reserve) The project developer shall demonstrate through an acoustical study that residences along roadways will be subject to noise levels consistent with the Bollard Acoustical Consultants, Inc. (BAC)
Environmental Noise Assessment
Westbrook Parcel WB-41 Residential Development – Roseville, California
City’s standards. The standards could be achieved through a combination of setbacks, sound walls or other barriers, building orientation or other measures.
An acoustical analysis shall be required to demonstrate that these measures will result in acceptable noise levels.
WMM 4.5-10 On-site Traffic Noise Policies (Impact 4.6-6 and 4.6-8 Urban Reserve) Specific Plans and/or other development proposals in the Remainder Area Urban Reserve shall include policies and/or conditions that require that residential development adjacent to roadways will be subject to traffic noise levels that fall within City standards. The standards could be achieved through a combination of setbacks, sound walls or other barriers, building orientation or other measures. An acoustical analysis shall be required to demonstrate that these measures will result in acceptable noise levels.
MM 4.6- 4: Traffic Noise Attenuation (Impact 4.6-6 and 4.6-8 SVSP) MM 4.6-4(a): Masonry walls and/or landscaped berms shall be constructed along the major project-area roadways adjacent to proposed residential uses if acoustical studies warrant sound attenuation, otherwise standard wood fencing is acceptable. Draft EIR Table 4.6-10 data shall be consulted to determine appropriate barrier heights. If the assumptions shown in Table 4.6-10 vary considerably, a detailed analysis of exterior and interior mitigation measures should be conducted when tentative maps become available.
MM 4.6-4(b): In areas requiring sound attenuation, noise barrier walls shall be constructed of concrete panels, concrete masonry units, earthen berms, or any combination of these materials. Wood is not recommended for construction due to eventual warping and degradation of acoustical performance.
MM 4.6-4(c): Tentative map applications for residential uses located along Fiddyment Road would be required to include an analysis of interior noise levels. The report shall be conducted by a qualified acoustical engineer and shall specify the measures required to achieve compliance with the City of Roseville 45 dB DNL interior noise level standard.
Evaluation of Future Traffic Noise Environment at Project Site Traffic Noise Prediction Methodology
The Federal Highway Administration Highway Traffic Noise Prediction Model (FHWA-RD-77- 108) was used to predict traffic noise levels at project subdivisions. The model is based upon the CALVENO noise emission factors for automobiles, medium trucks, and heavy trucks, with consideration given to vehicle volume, speed, roadway configuration, distance to the receiver, and the acoustical characteristics of the site. The FHWA Model was developed to predict hourly Bollard Acoustical Consultants, Inc. (BAC)
Environmental Noise Assessment
Westbrook Parcel WB-41 Residential Development – Roseville, California
Leq values for free-flowing traffic conditions and is considered to be accurate within 1.5 dB in most situations.
Predicted Future Exterior Traffic Noise Levels
The FHWA Model was used with future traffic data to predict future Pleasant Grove Boulevard and Santucci Boulevard traffic noise levels at the project site. Future daily traffic (ADT) volumes for the roadways were calculated using data obtained from the Sierra Vista Specific Plan Traffic Impact Analysis prepared by DKS Associates (2009). Specifically, the future average daily traffic (ADT) volumes for the roadways were conservatively estimated by applying a factor of 5 to the sum of AM and PM peak hour conditions (Cumulative Plus Project). A complete listing of FHWA Model inputs and predicted future traffic noise levels at the project site are contained in Appendix B and are summarized in Table 2.
Table 2
Predicted Future Exterior Traffic Noise Levels at the Project Site Roadway Location Description Predicted DNL (dB)1,2
Pleasant Grove Boulevard
Nearest backyards 63
Nearest first-floor facades 62
Nearest upper-floor facades 64
Santucci Boulevard
Nearest backyards 66
Nearest first-floor facades 66
Nearest upper-floor facades 68
1 A complete listing of FHWA Model inputs and results are provided in Appendix B. 2 Predicted traffic noise levels at upper-floor building facades include consideration of reduced ground absorption of sound at elevated positions.
Source: Bollard Acoustical Consultants, Inc. (2021)
Exterior Traffic Noise Compliance Evaluation
As indicated in Table 2, future Pleasant Grove Boulevard and Santucci Boulevard traffic noise levels at the proposed outdoor activity areas (backyards) nearest to the roadways are predicted to exceed the City of Roseville General Plan exterior noise level standard of 60 dB DNL.
However, the project site plans indicate that masonry walls (Proto II system construction) are proposed to be constructed along Pleasant Grove Boulevard and Santucci Boulevard at the locations shown on Figure 2. The results presented in Table 3 below contain predicted future traffic noise levels at proposed ground level locations with consideration of the noise attenuation that would be provided by the proposed masonry walls. Barrier effectiveness worksheets for the walls are provided in Appendix C. Because elevated upper-floor building facades of the residences constructed adjacent to the roadways would not receive shielding from the masonry walls, barrier analyses were not conducted for those locations.
It should be noted that, although the project site plans show the locations of the masonry walls, information pertaining to the overall heights of said walls is not included. For the purposes of this analysis, it was assumed that the masonry walls will have a minimum height of 6-feet.
Bollard Acoustical Consultants, Inc. (BAC)
Environmental Noise Assessment
Westbrook Parcel WB-41 Residential Development – Roseville, California
Table 3
Predicted Future Exterior Traffic Noise Levels at Project Site with 6-Foot-Tall Masonry Walls Roadway Location Description Predicted DNL (dB)1
Pleasant Grove Boulevard
Nearest backyards 57
Nearest first-floor facades 56
Nearest upper-floor facades 64
Santucci Boulevard
Nearest backyards 60
Nearest first-floor facades 60
Nearest upper-floor facades 68
1 Predicted noise levels at ground level locations include consideration of shielding provided by 6-foot-tall masonry walls at the locations shown on Figure 2. Barrier insertion loss calculation worksheets are provided in Appendix C.
Source: Bollard Acoustical Consultants, Inc. (2021)
The Table 3 data indicate that future Pleasant Grove Boulevard and Santucci Boulevard traffic noise levels at the proposed outdoor activity areas (backyards) nearest to the roadways are predicted to satisfy the City of Roseville General Plan exterior noise level standard of 60 dB DNL, including consideration of the shielding provided by masonry walls having a minimum height of 6-feet at the locations illustrated in Figure 2. Thus, provided that masonry walls having a minimum height of 6-feet are constructed at the locations shown in Figure 2, no further consideration of exterior Pleasant Grove Boulevard or Santucci Boulevard traffic noise mitigation measures would be warranted for the project. It should be noted that the 6-foot wall height required for compliance indicated above is relative to adjacent residential lot or roadway elevation, whichever is greater.
Interior Traffic Noise Compliance Evaluation
As indicated in Table 3, future Pleasant Grove Boulevard and Santucci Boulevard traffic noise levels at the first-floor building facades nearest to the roadways are predicted to range from 56 to 60 dB DNL, including consideration of the shielding that would be provided by the masonry walls. Due to reduced ground absorption at elevated positions and lack of screening by the walls, future traffic noise levels at the upper-floor facades of those residences are predicted to range from 64 to 68 dB DNL. To satisfy the City of Roseville General Plan 45 dB DNL interior noise level standard, minimum noise reductions of 15 dB and 23 dB would be required of the first- and upper-floor building facades (respectively) of the residences constructed adjacent to the roadways.
Standard residential construction (stucco siding, STC-27 windows, door weather-stripping, exterior wall insulation, composition plywood roof), typically results in an exterior to interior noise reduction of at least 25 dB with windows closed and approximately 15 dB with windows open.
This level of noise reduction would be adequate to reduce future Pleasant Grove Boulevard and Santucci Boulevard traffic noise levels within all floors of residences in this development to 45 dB DNL or less, which would satisfy the General Plan 45 dB DNL interior noise level standard for residential uses. Nonetheless, mechanical ventilation (air conditioning) should be provided Bollard Acoustical Consultants, Inc. (BAC)
Environmental Noise Assessment
Westbrook Parcel WB-41 Residential Development – Roseville, California
for all residences within this development to allow the occupants to close doors and windows as desired for additional acoustical isolation.
Conclusions & Recommendations
The Westbrook Parcel WB-41 Residential Development is predicted to be exposed to future Pleasant Grove Boulevard and Santucci Boulevard traffic noise exposure in compliance with the applicable City of Roseville General Plan 60 dB DNL exterior noise level standard for residential uses provided that the project design includes the construction of masonry walls having a minimum height of 6-feet at the locations shown on Figure 2 (as proposed). The minimum masonry wall height of 6-feet required for compliance is relative to adjacent residential lot or roadway elevation, whichever is greater.
In addition, standard residential construction (stucco siding, STC-27 windows, door weatherstripping, exterior wall insulation, composition plywood roof) would be adequate to reduce future Pleasant Grove Boulevard and Santucci Boulevard traffic noise levels within all floors of residences in this development to 45 dB DNL or less, which would satisfy the applicable City of Roseville General Plan 45 dB DNL interior noise level standard for residential uses.
Nonetheless, mechanical ventilation (air conditioning) should be provided for all residences within this development to allow the occupants to close doors and windows as desired for additional acoustical isolation.
These conclusions are based on the future traffic data cited in Appendix B, the project site plan shown on Figure 2, and on noise reduction data for standard residential dwellings and for typical STC rated window data. Deviations from the above-mentioned resources could cause future traffic noise levels to differ from those predicted in this assessment. In addition, Bollard Acoustical Consultants, Inc. is not responsible for degradation in acoustic performance of the residential construction due to poor construction practices, failure to comply with applicable building code requirements, or for failure to adhere to the minimum building practices cited in this report.
This concludes BAC’s traffic noise assessment for the proposed Westbrook Parcel WB-41 Residential Development in Roseville, California. Please contact BAC at (916) 663-0500 or [email protected] with any questions regarding this assessment.
Appendix A
Acoustical Terminology
Acoustics The science of sound.
Ambient Noise The distinctive acoustical characteristics of a given space consisting of all noise sources audible at that location. In many cases, the term ambient is used to describe an existing or pre-project condition such as the setting in an environmental noise study.
Attenuation The reduction of an acoustic signal.
A-Weighting A frequency-response adjustment of a sound level meter that conditions the output signal to approximate human response.
Decibel or dB Fundamental unit of sound. A Bell is defined as the logarithm of the ratio of the sound pressure squared over the reference pressure squared. A Decibel is one-tenth of a Bell.
CNEL Community Noise Equivalent Level. Defined as the 24-hour average noise level with noise occurring during evening hours (7 - 10 p.m.) weighted by a factor of three and nighttime hours weighted by a factor of 10 prior to averaging.
Frequency The measure of the rapidity of alterations of a periodic signal, expressed in cycles per second or hertz.
IIC Impact Insulation Class (IIC): A single-number representation of a floor/ceiling partition’s impact generated noise insulation performance. The field-measured version of this number is the FIIC.
Ldn Day/Night Average Sound Level. Similar to CNEL but with no evening weighting.
Leq Equivalent or energy-averaged sound level.
Lmax The highest root-mean-square (RMS) sound level measured over a given period of time.
Loudness A subjective term for the sensation of the magnitude of sound.
Masking The amount (or the process) by which the threshold of audibility is for one sound is raised by the presence of another (masking) sound.
Noise Unwanted sound.
Peak Noise The level corresponding to the highest (not RMS) sound pressure measured over a given period of time. This term is often confused with the “Maximum” level, which is the highest RMS level.
RT60 The time it takes reverberant sound to decay by 60 dB once the source has been removed.
STC Sound Transmission Class (STC): A single-number representation of a partition’s noise insulation performance. This number is based on laboratory-measured, 16-band (1/3- octave) transmission loss (TL) data of the subject partition. The field-measured version of this number is the FSTC.
Westbrook Parcel WB-41 Residential Development
Future
8,905
85 15
1 1
45 Soft
Medium Heavy
Location Description Distance Offset (dB) Autos Trucks Trucks Total 1 Nearest backyards 85 62 50 55 63
2 Nearest first-floor facades 95 61 50 54 62
3 Nearest upper-floor facades 95 2 63 52 56 64
DNL Contour (dB)
75 70
65 60
Notes:
Traffic Noise Levels:
----------------- DNL, dB -----------------
Traffic Noise Contours (No Calibration Offset):
Distance from Centerline (ft)
14 29
63 136
1. Future average dailty traffic volume (ADT) calculated from data obtained from the Sierra Vista Specific Plan Traffic Impact Analysis prepared by DKS Associates (2009). Specifically, future (Cumulative Plus Project) roadway ADT was conservatively estimated by applying a factor of 5 to the sum of AM and PM peak hour conditions.
2. An offset of +2 dB was applied at upper-floor facades due to reduced ground absorption of sound at elevated positions.
Intervening Ground Type (hard/soft):
Project Name:
Roadway Name: Pleasant Grove Boulevard
Traffic Data:
Year:
Average Daily Traffic Volume:
Percent Daytime Traffic:
Percent Nighttime Traffic:
Percent Medium Trucks (2 axle):
Percent Heavy Trucks (3+ axle):
Assumed Vehicle Speed (mph):
Job Number: 2021-128
Appendix B-1
FHWA Traffic Noise Prediction Model (FHWA-RD-77-108)
Noise Prediction Worksheet
Project Information:
Westbrook Parcel WB-41 Residential Development
Future
25,895
85 15
1 1
45 Soft
Medium Heavy
Location Description Distance Offset (dB) Autos Trucks Trucks Total 1 Nearest backyards 105 65 54 58 66
2 Nearest first-floor facades 115 65 53 58 66
3 Nearest upper-floor facades 115 2 67 55 60 68
DNL Contour (dB)
75 70
65 60
Notes:
60 129
278
1. Future average dailty traffic volume (ADT) calculated from data obtained from the Sierra Vista Specific Plan Traffic Impact Analysis prepared by DKS Associates (2009). Specifically, future (Cumulative Plus Project) roadway ADT was conservatively estimated by applying a factor of 5 to the sum of AM and PM peak hour conditions.
2. An offset of +2 dB was applied at upper-floor facades due to reduced ground absorption of sound at elevated positions.
28 Percent Daytime Traffic:
Percent Nighttime Traffic:
Percent Medium Trucks (2 axle):
Percent Heavy Trucks (3+ axle):
Assumed Vehicle Speed (mph):
Intervening Ground Type (hard/soft):
Traffic Noise Levels:
----------------- DNL, dB -----------------
Traffic Noise Contours (No Calibration Offset):
Distance from Centerline (ft)
Average Daily Traffic Volume:
Appendix B-2
FHWA Traffic Noise Prediction Model (FHWA-RD-77-108)
Noise Prediction Worksheet
Project Information:
Job Number: 2021-128
Project Name:
Roadway Name: Santucci Boulevard
Traffic Data:
Year:
2021-128
Westbrook Parcel WB-41 Residential Development
Pleasant Grove Boulevard
Future
62 50
55 75
10 0
2 8
0 5
0 6
Autos
Medium
Trucks
Heavy
Trucks Total Autos?
Medium
Trucks?
Heavy
Trucks?
6 56 44 50 57 Yes Yes Yes
7 54 43 49 56 Yes Yes Yes
8 53 41 47 54 Yes Yes Yes
9 52 40 46 53 Yes Yes Yes
10 51 39 44 52 Yes Yes Yes
11 49 38 43 51 Yes Yes Yes
12 49 37 42 50 Yes Yes Yes
13 48 36 42 49 Yes Yes Yes
14 47 36 41 49 Yes Yes Yes
Notes:
Appendix C-1
FHWA Traffic Noise Prediction Model (FHWA-RD-77-108)
Noise Barrier Effectiveness Prediction Worksheet
Project Information: Job Number:
Project Name:
Roadway Name:
Noise Level Data: Year:
Auto DNL (dB):
Medium Truck DNL (dB):
Heavy Truck DNL (dB):
Receiver Description:
Barrier Effectiveness:
Top of
Barrier
Elevation (ft)
Barrier
Height (ft)
-------------------- DNL, dB --------------------
Nearest backyards
Centerline to Barrier Distance (C1):
Barrier to Receiver Distance (C2):
Automobile Elevation:
Medium Truck Elevation:
Site Geometry:
Heavy Truck Elevation:
Pad/Ground Elevation at Receiver:
Receiver Elevation:
Base of Barrier Elevation:
Starting Barrier Height:
Barrier Breaks Line of Sight to…
6 8
9 10
11 12
13 14
1. Standard receiver elevation is five feet above grade/pad elevations at the receiver location(s). 7 2021-128
Westbrook Parcel WB-41 Residential Development
Pleasant Grove Boulevard
Future
61 50
54 75
20 0
2 8
0 5
0 6
Autos
Medium
Trucks
Heavy
Trucks Total Autos?
Medium
Trucks?
Heavy
Trucks?
6 55 44 49 56 Yes Yes Yes
7 54 43 49 55 Yes Yes Yes
8 53 42 48 54 Yes Yes Yes
9 52 41 46 53 Yes Yes Yes
10 51 39 45 52 Yes Yes Yes
11 50 39 44 51 Yes Yes Yes
12 49 38 43 51 Yes Yes Yes
13 48 37 43 50 Yes Yes Yes
14 48 36 42 49 Yes Yes Yes
Notes:
Barrier Breaks Line of Sight to…
6 8
9 10
11 12
13 14
1. Standard receiver elevation is five feet above grade/pad elevations at the receiver location(s). 7 Barrier Effectiveness:
Top of
Barrier
Elevation (ft)
Barrier
Height (ft)
-------------------- DNL, dB --------------------
Nearest first-floor facades
Centerline to Barrier Distance (C1):
Barrier to Receiver Distance (C2):
Automobile Elevation:
Medium Truck Elevation:
Site Geometry:
Heavy Truck Elevation:
Pad/Ground Elevation at Receiver:
Receiver Elevation:
Base of Barrier Elevation:
Starting Barrier Height:
Auto DNL (dB):
Medium Truck DNL (dB):
Heavy Truck DNL (dB):
Receiver Description:
Project Name:
Roadway Name:
Noise Level Data: Year:
Appendix C-2
FHWA Traffic Noise Prediction Model (FHWA-RD-77-108)
Noise Barrier Effectiveness Prediction Worksheet
Project Information: Job Number:
2021-128
Westbrook Parcel WB-41 Residential Development
Santucci Boulevard
Future
65 54
58 95
10 0
2 8
0 5
0 6
Autos
Medium
Trucks
Heavy
Trucks Total Autos?
Medium
Trucks?
Heavy
Trucks?
6 59 48 53 60 Yes Yes Yes
7 58 46 52 59 Yes Yes Yes
8 56 45 50 57 Yes Yes Yes
9 55 44 49 56 Yes Yes Yes
10 54 43 48 55 Yes Yes Yes
11 53 42 47 54 Yes Yes Yes
12 52 40 46 53 Yes Yes Yes
13 51 40 45 52 Yes Yes Yes
14 51 39 44 52 Yes Yes Yes
Notes:
Appendix C-3
FHWA Traffic Noise Prediction Model (FHWA-RD-77-108)
Noise Barrier Effectiveness Prediction Worksheet
Project Information: Job Number:
Project Name:
Roadway Name:
Noise Level Data: Year:
Auto DNL (dB):
Medium Truck DNL (dB):
Heavy Truck DNL (dB):
Receiver Description:
Barrier Effectiveness:
Top of
Barrier
Elevation (ft)
Barrier
Height (ft)
-------------------- DNL, dB --------------------
Nearest backyards
Centerline to Barrier Distance (C1):
Barrier to Receiver Distance (C2):
Automobile Elevation:
Medium Truck Elevation:
Site Geometry:
Heavy Truck Elevation:
Pad/Ground Elevation at Receiver:
Receiver Elevation:
Base of Barrier Elevation:
Starting Barrier Height:
Barrier Breaks Line of Sight to…
6 8
9 10
11 12
13 14
1. Standard receiver elevation is five feet above grade/pad elevations at the receiver location(s). 7 2021-128
Westbrook Parcel WB-41 Residential Development
Santucci Boulevard
Future
65 53
58 95
20 0
2 8
0 5
0 6
Autos
Medium
Trucks
Heavy
Trucks Total Autos?
Medium
Trucks?
Heavy
Trucks?
6 59 47 53 60 Yes Yes Yes
7 58 46 52 59 Yes Yes Yes
8 57 45 51 58 Yes Yes Yes
9 56 44 50 57 Yes Yes Yes
10 54 43 49 56 Yes Yes Yes
11 54 42 48 55 Yes Yes Yes
12 53 42 47 54 Yes Yes Yes
13 52 41 46 53 Yes Yes Yes
14 51 40 45 53 Yes Yes Yes
Notes:
Barrier Breaks Line of Sight to…
6 8
9 10
11 12
13 14
1. Standard receiver elevation is five feet above grade/pad elevations at the receiver location(s). 7 Barrier Effectiveness:
Top of
Barrier
Elevation (ft)
Barrier
Height (ft)
-------------------- DNL, dB --------------------
Nearest first-floor facades
Centerline to Barrier Distance (C1):
Barrier to Receiver Distance (C2):
Automobile Elevation:
Medium Truck Elevation:
Site Geometry:
Heavy Truck Elevation:
Pad/Ground Elevation at Receiver:
Receiver Elevation:
Base of Barrier Elevation:
Starting Barrier Height:
Auto DNL (dB):
Medium Truck DNL (dB):
Heavy Truck DNL (dB):
Receiver Description:
Project Name:
Roadway Name:
Noise Level Data: Year:
Appendix C-4
FHWA Traffic Noise Prediction Model (FHWA-RD-77-108)
Noise Barrier Effectiveness Prediction Worksheet
Project Information: Job Number:
1013 Galleria Blvd. Suite 255 Roseville, CA 95678 (916) 773-1900 Fax (916) 773-2015 www.fehrandpeers.com
TECHNICAL MEMORANDUM
Date: July 30, 2021
To: Jack Varozza, PE – City of Roseville
From: John Gard, PE – Fehr & Peers
Subject: Transportation Evaluation of Proposed Rezone of Sierra Vista Specific Plan Parcel WB-41 RS21-4077
This memorandum presents the assumptions, analysis methods, and results of our evaluation of the proposed rezone of Parcel WB-41 in the Sierra Vista Specific Plan (SVSP). The analysis focuses on how conditions would change under cumulative (2035) conditions because the surrounding area is mostly undeveloped. A baseline analysis would therefore not be meaningful.
Proposed Land Use Changes
The project site is situated in the southeast corner of the Pleasant Grove Boulevard/Santucci Boulevard intersection. The proposed project would rezone the 10.1-acre Parcel WB-41 from community commercial to medium density residential. Refer to Figure 1 for project location and Figure 2 for project site plan for the proposed medium density residential.
The Sierra Vista Specific Plan (2010) indicates that community commercial parcels could be constructed with a floor-to-area ratio (FAR) of up to 0.4. However, experience on other retail parcels in the City suggests a 0.25 FAR is a more reasonable yield. Accordingly, it is assumed the existing zoning would yield 110,000 square feet of retail space.
According to the project site plan (Tentative Subdivision Map for Sierra Vista Specific Plan Parcel WB41, MacKay & Somps, April 2021) the proposed rezone would yield 63 single-family detached dwelling units.
Trip Generation Comparison
We compared the trip generation of Parcel 41 based on its existing and proposed zoning using trip generation rates from the City of Roseville 2035 travel demand model1 . Table 1 shows the results,
and indicates that the proposed rezoning would result in substantially fewer trips generated by the property. This suggests that traffic volumes in the vicinity of the project would be reduced during peak hours and on a daily basis as a result of the land use change. 1 Trip rates from the City’s model were used for this comparison because subsequent analysis of changes in external travel (i.e., at the specific plan boundary) also rely on the City’s travel demand model and rates.
ADDENDUM ATTACHMENT 5
July 30, 2021
Transportation Evaluation of Proposed Rezone of Sierra Vista Specific Plan Parcel WB-41 1013 Galleria Blvd. Suite 255 Roseville, CA 95678 (916) 773-1900 Fax (916) 773-2015 www.fehrandpeers.com
Table 1
Trip Generation Comparison – Existing vs. Proposed Zoning Land Use Amount
Trip Rate 1 Trips
AM
Peak
Hour
PM
Peak
Hour Daily
AM Peak
Hour
PM Peak
Hour Daily
Existing Zoning
Retail 110 ksf 0.72 2.67 35 79 294 3,850
Proposed Zoning
Single-Family
Residential 63 du’s 0.67 0.78 9 42 49 567
Difference -37 -245 -3,283
Notes:
1. Daily and PM peak hour trip rates from the City of Roseville travel demand model. AM peak hour rate estimated by calculating the difference in trip rates from the City’s model (for PM peak hour and daily) versus the Trip Generation Manual (ITE, 2017) and applying this factor to ITE’s AM peak hour rate. ksf = thousand square feet. du’s = dwelling units.
Source: Fehr & Peers, 2021.
External Trip Generation Comparison
The proposed land use change would reduce the overall amount of retail in the SVSP. An analysis was performed to determine whether the reduction in retail would cause a greater amount of Specific Plan trips to be external to the Plan.
The analysis was performed using the City’s 2035 travel demand model. Trips generated by the Specific Plan were tracked as either remaining internal or being external to the plan. The results are shown in Table 2 and indicate that the proposed rezone would result in fewer external AM and PM peak hour and daily trips generated by the Specific Plan when compared to the existing zoning.
Table 2
SVSP External Trip Generation Comparison – 2035 With Existing vs. Proposed Zoning Scenario
External Trips
AM Peak Hour PM Peak Hour Daily
2035 with Existing Zoning 7,493 8,996 114,281
2035 with Proposed Zoning 7,439 8,877 112,615
Difference -54 -119 -1,666
Source: City of Roseville travel demand model output.
July 30, 2021
Transportation Evaluation of Proposed Rezone of Sierra Vista Specific Plan Parcel WB-41 1013 Galleria Blvd. Suite 255 Roseville, CA 95678 (916) 773-1900 Fax (916) 773-2015 www.fehrandpeers.com
Vehicle Miles Traveled (VMT)
VMT was calculated using the City of Roseville 2035 travel demand model on a Citywide basis (i.e., travel generated by all land uses within the city) and for the SVSP only. The model was run with the existing and proposed rezoning. The results are shown in Table 3 and indicate that the rezone would decrease in total VMT both for the SVSP only and for the City as a whole.
Table 3
VMT Comparison – 2035 With Existing vs. Proposed Zoning City of Roseville Total VMT Sierra Vista Specific Plan Total VMT 2035 with Existing Zoning 9,728,939 837,375
2035 with Proposed Zoning 9,711,358 825,776
Difference -17,581 -11,599
Notes:
1. Source: City of Roseville travel demand model output.
When compared to the existing zoning, the proposed rezone would generate fewer site trips, fewer trips entering/exiting the SVSP area, and less VMT. Thus, there would be no adverse effects to the roadway network caused by the rezone.
We hope this information is helpful. Please with any questions or comments.
B
a
s
e
l
i
n
e
R
d
Foothills Blvd
B
lueO
a
ks
B
l
vd
Fiddyment Rd
P
l
easantGrove Blvd
V
i
n
e
y
a
r
d
R
d
J
u
n
cti
on Blvd
WashingtonBlvd
WoodcreekOaks Blvd
M
a
i
n
S
t
nI dustrial Ave
Fairway Dr
Atk ni son St
HaydenPw
AtlanticSt
DiamondOa
ks
Rd
McAnallyDr
Church St
DelWebbBlvd
MarketSt
BobDoyleDr
CountryClubDr
Lonetree Blvd
ShastaSt
Westpark Dr
Hall
i
ssy
Dr
Folsom Rd
Gi
b
s
o
n
Dr
CrowderLn
HighlandPa
r
kD
r
KennerleighPw
YosemiteSt
Sun
City
Blvd
Holt
Pkwy
Westbrook Blvd
V
i
s
ta
G
r
a
n de Blvd
Free
d
o
m
Way
Santucci Blvd
N:\2021 Projects\4077.00_Sierra_Vista_Specific_Plan_Parcel_WB-41_Rezone\Graphics\GIS\MXD\Fig01_ProjectLocation.mxd ProjectLocation
Figure1
RosevilleCityBoundary
Park
}65
Project
Location
Star Trail Way
Pleasant Grove Boulevard
Daylight Drive
"A" Drive
"B" Way
"C" Way
Santucci Boulevard
Project Site Plan
Figure 2
N:\2021 Projects\4077.00_Sierra_Vista_Specific_Plan_Parcel_WB-41_Rezone\Graphics\AI\Fig02_ProjectSitePlan.ai SB18
Tribal Consultation Notice
August 5, 2021
To: Anna Starkey, Cultural Regulatory Specialist Don Ryberg, Chairperson United Auburn Indian Community Tsi Akim Maidu
10720 Indian Hill Road P.O. Box 510
Auburn, CA 95603 Browns Valley, CA 95918
Grayson Coney, Cultural Director Regina Cuellar, Chairperson Tsi Akim Maidu Shingle Springs Band of Miwok Indians
P.O. Box 510 P.O. Box 1340
Browns Valley, CA 95918 Shingle Springs, CA 95682
Pamela Cubbler, Treasurer Clyde Prout, Chairman
Colfax-Todds Valley Consolidated Tribe Colfax-Todds Valley Consolidated Tribe P.O. Box 4884 P.O. Box 4884
Auburn, CA 95604 Auburn, CA 95604
Darrel Cruz, Cultural Resources Department, THPO
Washoe Tribe of Nevada & California
919 Hwy 395 South
Gardnerville, NV 89410
Subject: Tribal Consultation Pursuant to SB 18 for Project #PL21-0161: SVSP PCL WB-41 – Rezone in the City of Roseville
The City of Roseville is processing an application for the above-referenced project, located in the northwestern portion of the City of Roseville. Recognizing the importance of tribal participation in the local planning process, the City is requesting your review of the project to determine if formal consultation is appropriate pursuant to Government Code Section 65352.3 (SB 18). Pursuant to Government Code Section 65352.3(a)(2) you have 90 days from receipt of this letter to respond.
The project description is attached to this letter.
The City looks forward to hearing from you. Should you have any questions, please send your written response by letter or by email to:
Mackenzie Harrison
311 Vernon Street
Roseville, CA 95678
[email protected]
ADDENDUM ATTACHMENT 6A
Project Description:
The project site is an undeveloped 10.11-acre parcel (APN 496-100-030-000) located on Parcel WB-41 of the Sierra Vista Specific Plan (SVSP), which was approved on May 5, 2010. The address of the property is 3301 Pleasant Grove Boulevard. The Environmental Impact Report (EIR) for the SVSP included an evaluation of the Cultural and Paleontological Resources within the project area. The proposed project will not result in any additional ground disturbance that was not considered in the EIR for the SVSP. The site has an existing General Plan land use designation and zoning designation of Community Commercial (CC). The site is adjacent to vacant High Density Residential (HDR) parcels to the north across Pleasant Grove Boulevard, a Low Density Residential (LDR) parcel currently under construction to the east across Daylight Drive, a lift station and a LDR parcel to the south, and agricultural land to the west beyond City limits across Santucci Boulevard.
The proposed project is a 63-unit single-family residential subdivision. The project entitlements include a General Plan Amendment and Specific Plan Amendment for Parcel WB-41 to modify the land use from CC to Medium Density Residential (MDR), a Rezone from CC to Small Lot Residential with Modified Development Standards (RS/DS), and Tentative Subdivision Map to create 63 single-family residential lots on WB-41. A Development Agreement Amendment (DAA) is included to update unit allocations and reflect the land use change.
Aerial View of Project Site
Project Site
Proposed Tentative Subdivision Map Proposed Tentative Subdivision Map
TENTATIVE MAP INFORMATION VICINITY MAP
iv.-. si.nn i Pleasan I Grove Boulevard
4T!«CCS;.
I
LC-I
14 10
iJ.VbJLMll.
I K’V.'.'.-j-vsvnwCM' TENTATIVE MAP NOTES
ii
54 IS S~"
<•
"C Way p
22 PARCEL SUMMARY TABLE T
38 Parcel Svmmanr
34 35 2T 31 32 26
I ,
fl J]
ISw
viorecd-swit ••S3 MtK»IK3>.f<a
& i.
A B
fl;.-J SCALE: 1"-K'' COVER SHEET
> » TENTATIVE SUBDIVISION MAP
c D E
Rosoilc C.‘ Juy 16.202' EJeSTPARK HlMKATk SOIJIPS
Silent 1 cM 2
I
WB 82
dw-'CMSHa:
I
i
W8 30
ec-car-coo
. «-
3- rr.ili-: I :
3 I
Baw and La ndscapa Icta
w ill 39 Ei i T
I
PARCEL WB-41 of fi>e Siecra Koto 5/jew'fc Pion
A’ yX-1----:,.
#F
1 F
•? «tway<ai:r«
EXISTING DAYLIGHT DRIVE
sRIMAfcv RFSIWNFAI r?=“
MINOR RESIDENTIAL STREET
' K»' RESIDENTIAL ENTRY
’‘-S-41
3.1.1. JJ
CHW. Pl r-.l*.
5..JW.:l r
.EXISTING PLEASANT GROVE BOULEVARD
' 4 LAHC^STSIAL
It T
lT
| WCSrBROOK VIL||aGE2C | . I I
-JJ
STANDARD ELBOW
iCIir 01 KOSL’-ILLL S L5.DWGSI Id!
Icievlo. OA eswl
i::ii:-.-r\-.e:dr-Sr.j.n
Pin PAI lip
r7.4 TV ° ‘ ‘
W»iu w
3331 ‘leaiaii G ewe Eoue.-.'r-: 7asev1e.CwMMI p
I
sjM.
a 3rje;nif<oi-j.;iU-'J. it: trailI
SANTUCCI BOULEVARD
6 LA MEATAL
•Lit.
KltlHS
illite;
w - -
L~Z- ^7 ,<«i
-Aj rv. i? Ir.-a.Tl
Hi
mtrfv A
.Son
' I 7:/
.. :«lk .
Il P _ JL I 11 _ U -J. 1-Z
, r ~ ' 41. v-.v..™i’.fl ail -I n-s'c-j TOianc J
orrelFasvla
CiltdVanils g^:i:
;c:>ir:w*Ki Ci-v«-y.<rc:ii»SH
I HI,FiJl::Ri.aiu ?LA«jl
irenixlAMKT
P.i /.-ml IfCwn.ii i- • : .1 .".: -U '•i.a'-n^AWra.'
hi^i wh:nll-KTHnhil*.HrLl>w>i<..'^R-
. wyract
(£& ,'ti.s
lXX'.,X,iil.,L-,J
1*1* '] ‘ EC rr-L
"B" Woy I gFpgF
n^±r+' i“ | i j
TP
I H
T /5=
4 r-= Hi
p
Mlr
_ W. W„ = 2.^- 1 7. n hH I - Id 1 - .
SB18
Tribal Consultation Notice
August 17, 2021
To: Anna Starkey, Cultural Regulatory Specialist Don Ryberg, Chairperson United Auburn Indian Community Tsi Akim Maidu
10720 Indian Hill Road P.O. Box 510
Auburn, CA 95603 Browns Valley, CA 95918
Grayson Coney, Cultural Director Regina Cuellar, Chairperson Tsi Akim Maidu Shingle Springs Band of Miwok Indians
P.O. Box 510 P.O. Box 1340
Browns Valley, CA 95918 Shingle Springs, CA 95682
Pamela Cubbler, Treasurer Clyde Prout, Chairman
Colfax-Todds Valley Consolidated Tribe Colfax-Todds Valley Consolidated Tribe P.O. Box 4884 P.O. Box 4884
Auburn, CA 95604 Auburn, CA 95604
Jesus Tarango, Chairperson Steven Hutchason, THPO
Wilton Rancheria Wilton Rancheria
9728 Ken Street 9728 Kent Street
Elk Grove, CA 95624 Elk Grove, CA 95624
Darrel Cruz, Cultural Resources Department, THPO Dahlton Brown, Director of Admin.
Washoe Tribe of Nevada & California 9728 Kent Street
919 Hwy 395 South Elk Grove, CA 95624
Gardnerville, NV 89410
Subject: Tribal Consultation Pursuant to SB 18 for Project #PL21-0161: SVSP PCL WB-41 – Rezone in the City of Roseville
The City of Roseville is processing an application for the above-referenced project, located in the northwestern portion of the City of Roseville. Recognizing the importance of tribal participation in the local planning process, the City is requesting your review of the project to determine if formal consultation is appropriate pursuant to Government Code Section 65352.3 (SB 18). Pursuant to Government Code Section 65352.3(a)(2) you have 90 days from receipt of this letter to respond.
The project description is attached to this letter.
The City looks forward to hearing from you. Should you have any questions, please send your written response by letter or by email to:
Mackenzie Harrison
311 Vernon Street
Roseville, CA 95678
[email protected]
ADDENDUM ATTACHMENT 6B
Project Description:
The project site is an undeveloped 10.11-acre parcel (APN 496-100-030-000) located on Parcel WB-41 of the Sierra Vista Specific Plan (SVSP), which was approved on May 5, 2010. The address of the property is 3301 Pleasant Grove Boulevard. The Environmental Impact Report (EIR) for the SVSP included an evaluation of the Cultural and Paleontological Resources within the project area. The proposed project will not result in any additional ground disturbance that was not considered in the EIR for the SVSP. The site has an existing General Plan land use designation and zoning designation of Community Commercial (CC). The site is adjacent to vacant High Density Residential (HDR) parcels to the north across Pleasant Grove Boulevard, a Low Density Residential (LDR) parcel currently under construction to the east across Daylight Drive, a lift station and a LDR parcel to the south, and agricultural land to the west beyond City limits across Santucci Boulevard.
The proposed project is a 63-unit single-family residential subdivision. The project entitlements include a General Plan Amendment and Specific Plan Amendment for Parcel WB-41 to modify the land use from CC to Medium Density Residential (MDR), a Rezone from CC to Small Lot Residential with Modified Development Standards (RS/DS), and Tentative Subdivision Map to create 63 single-family residential lots on WB-41. A Development Agreement Amendment (DAA) is included to update unit allocations and reflect the land use change.
Aerial View of Project Site
Project Site
Proposed Tentative Subdivision Map Proposed Tentative Subdivision Map
TENTATIVE MAP INFORMATION VICINITY MAP
iv.-. si.nn i Pleasan I Grove Boulevard
4T!«CCS;.
I
LC-I
14 10
iJ.VbJLMll.
I K’V.'.'.-j-vsvnwCM' TENTATIVE MAP NOTES
ii
54 IS S~"
<•
"C Way p
22 PARCEL SUMMARY TABLE T
38 Parcel Svmmanr
34 35 2T 31 32 26
I ,
fl J]
ISw
viorecd-swit ••S3 MtK»IK3>.f<a
& i.
A B
fl;.-J SCALE: 1"-K'' COVER SHEET
> » TENTATIVE SUBDIVISION MAP
c D E
Rosoilc C.‘ Juy 16.202' EJeSTPARK HlMKATk SOIJIPS
Silent 1 cM 2
I
WB 82
dw-'CMSHa:
I
i
W8 30
ec-car-coo
. «-
3- rr.ili-: I :
3 I
Baw and La ndscapa Icta
w ill 39 Ei i T
I
PARCEL WB-41 of fi>e Siecra Koto 5/jew'fc Pion
A’ yX-1----:,.
#F
1 F
•? «tway<ai:r«
EXISTING DAYLIGHT DRIVE
sRIMAfcv RFSIWNFAI r?=“
MINOR RESIDENTIAL STREET
' K»' RESIDENTIAL ENTRY
’‘-S-41
3.1.1. JJ
CHW. Pl r-.l*.
5..JW.:l r
.EXISTING PLEASANT GROVE BOULEVARD
' 4 LAHC^STSIAL
It T
lT
| WCSrBROOK VIL||aGE2C | . I I
-JJ
STANDARD ELBOW
iCIir 01 KOSL’-ILLL S L5.DWGSI Id!
Icievlo. OA eswl
i::ii:-.-r\-.e:dr-Sr.j.n
Pin PAI lip
r7.4 TV ° ‘ ‘
W»iu w
3331 ‘leaiaii G ewe Eoue.-.'r-: 7asev1e.CwMMI p
I
sjM.
a 3rje;nif<oi-j.;iU-'J. it: trailI
SANTUCCI BOULEVARD
6 LA MEATAL
•Lit.
KltlHS
illite;
w - -
L~Z- ^7 ,<«i
-Aj rv. i? Ir.-a.Tl
Hi
mtrfv A
.Son
' I 7:/
.. :«lk .
Il P _ JL I 11 _ U -J. 1-Z
, r ~ ' 41. v-.v..™i’.fl ail -I n-s'c-j TOianc J
orrelFasvla
CiltdVanils g^:i:
;c:>ir:w*Ki Ci-v«-y.<rc:ii»SH
I HI,FiJl::Ri.aiu ?LA«jl
irenixlAMKT
P.i /.-ml IfCwn.ii i- • : .1 .".: -U '•i.a'-n^AWra.'
hi^i wh:nll-KTHnhil*.HrLl>w>i<..'^R-
. wyract
(£& ,'ti.s
lXX'.,X,iil.,L-,J
1*1* '] ‘ EC rr-L
"B" Woy I gFpgF
n^±r+' i“ | i j
TP
I H
T /5=
4 r-= Hi
p
Mlr
_ W. W„ = 2.^- 1 7. n hH I - Id 1 - .
CEQA AB52
Tribal Consultation Notice
Date: August 5, 2021
To: Anna Starkey, Cultural Regulatory Specialist Don Ryberg, Chairperson United Auburn Indian Community Tsi Akim Maidu
10720 Indian Hill Road PO Box 510
Auburn, CA 95603 Browns Valley, CA 95918
Sara D. Setshwaelo, Cultural Committee Chair Nicholas Fonseca, Chairperson Ione Band of Miwok Indians Shingle Springs Band of Miwok Indians P.O. Box 699 P.O. Box 1340
Plymouth, CA 95669 Shingle Springs, CA 95682
RE: Notice of Opportunity to Consult Under AB52 for the SVSP PCL WB-41 – Rezone Project (File #PL21-0161) in the City of Roseville
The City of Roseville will soon be initiating environmental review under the California Environmental Quality Act (CEQA) for the above referenced project. A project location map and preliminary project description are enclosed for your information.
In accordance with Assembly Bill 52 (AB 52) and Section 21080.3.1(d) of the California Public Resources Code (PRC), we are responding to your Tribe’s request to be notified of projects in our jurisdiction that will be reviewed under CEQA. The above names were provided to the City of Roseville as the point of contact for your tribe. We are hereby notifying you of an opportunity to consult with us regarding the potential for this project to impact Tribal Cultural Resources, as defined in Section 21074 of the PRC. The purposes of tribal consultation under AB 52 are to determine, as part of the CEQA review process, whether or not Tribal Cultural Resources are present within the project area, and if so, whether or not those resources will be significantly impacted by the project. If Tribal Cultural Resources may be significantly impacted, then consultation will also help to determine the most appropriate way to avoid or mitigate those impacts.
Mackenzie Harrison is the City’s Lead Agency Contact to receive replies in response to this notice. In accordance with Section 21080.3.1(d) of the PRC, you have 30 days from the receipt of this notice to either request or decline AB52 consultation in writing for this project from the City’s Lead Agency Contact.
Please send your written response by letter or by email to:
Mackenzie Harrison
311 Vernon Street
Roseville, CA 95678
[email protected]
Cc: Jason Camp, Tribal Historic Preservation Officer
ADDENDUM ATTACHMENT 6C
Project Description:
The project site is an undeveloped 10.11-acre parcel (APN 496-100-030-000) located on Parcel WB-41 of the Sierra Vista Specific Plan (SVSP), which was approved on May 5, 2010. The address of the property is 3301 Pleasant Grove Boulevard. The Environmental Impact Report (EIR) for the SVSP included an evaluation of the Cultural and Paleontological Resources within the project area. The proposed project will not result in any additional ground disturbance that was not considered in the EIR for the SVSP. The site has an existing General Plan land use designation and zoning designation of Community Commercial (CC).
The site is adjacent to vacant High Density Residential (HDR) parcels to the north across Pleasant Grove Boulevard, a Low Density Residential (LDR) parcel currently under construction to the east across Daylight Drive, a lift station and a LDR parcel to the south, and agricultural land to the west beyond City limits across Santucci Boulevard.
The proposed project is a 63-unit single-family residential subdivision. The project entitlements include a General Plan Amendment and Specific Plan Amendment for Parcel WB-41 to modify the land use from CC to Medium Density Residential (MDR), a Rezone from CC to Small Lot Residential with Modified Development Standards (RS/DS), and Tentative Subdivision Map to create 63 single-family residential lots on WB-41. A Development Agreement Amendment (DAA) is included to update unit allocations and reflect the land use change.
Aerial View of Project Site
Project Site
Proposed Tentative Subdivision Map Proposed Tentative Subdivision Map
TENTATIVE MAP INFORMATION VICINITY MAP
YMWlH.CH •’5441
'Qll.-An.
Pleasan I Grove Boulevard SITE
<L FUWX-C
LC-1
5 13 10 9
2 'lUVUJ/Ol Lil g-'.tieu.l:
"B" Way TENTATIVE MAP NOTES
B W
IS
"C" Way PARCEL SUMMARY TABLE T 31 32 35
26 1 1
./r iTTV'l
ricw ki.
B
ft
,:.y .u y
SCALE; 1n-»‘ ^r
I'.iizi: -'4V' ' -W I
4"
<D>
Racvile CA J*jy 16.2C2* ESestpark mMUYMOMS
SIlBHt 1 Ol 1
COVER SHEET TENTATIVE SUBDIVISION MAP
J
3 VJB 30
-IM- CC-CW-tlK
WB 32
404-'Cj-:j2<a::
I
.EXISTING PLEASANT GROVE BOULEVARD
I LAHC A^TZR/.l
WB-31
4fB-1C3QW)K
I
i
i
PARCEL WB-41 ofli>e S^crv Vbta5peCilCPkx>
4-
-4 -T
:• hbwctto
.L’J. iL, ;T:-:I
t&T
S-WIII-MCViaiB: wte.
L'l wife. A wal*1: gr
RESIDENTIAL ENTRY v'ii41
MINOR RESIDENTIAL STREET
55SSr“*“
. ri WESTBKXX VISAGE 2C |
I rr.vzj’Si’5 I I
I
;:E
f-arcelSummaiv
saw and lo idicopa Ids
EXISTING DAYLIGHT DRIVE
^IMAE'RFSICTNrAI ST?:~
I, , I
:: iw.r; '
STANDARD ELBOW
iCH i-OI KOSL’-'ILLL 3 U. DWG SI 14'
sa.vLM Lui;
I M>W.rviwn«ftr'wLd
3icii:n.:!io+.:. i
. landKop9Lo1Summ«iy -fejnI -x ibi <s. ci.d ’; > bn.. •. b.n I-SsnnbU.iSi-i: 11: I'm
-513^
i ' ‘
-4
TP.
^S»
n il~’
AS1 jKHCnlf<OkaCb
lk.'4. lb; rt-Sil
-LT
SANTUCCI BOULEVARD
T't ill
W^.J7.F G
ll!
IB
——
.j. !«
SlAAKOy A SlWfli <*.•/!
i::m r.wx:rta r
Aif
/Tib.
5 l»r
r
'IS £ 3-c? .xH Tt
ii _ r _j. ,-s-MI _
I J,' L.',,l j.-
“.a »U:K»IK0V.r.Sk 1TK IOK I KflU-O ! «1H r.s '
ram [Gj
I W 01 62 ® I
Ro
'v4±^
"A" Drive
. i ' J fml |!i. IL " Li
I
T\ 1 ” I 3r \ /Ah. I
..ilvfirwaiwiri
'Jl-iCkKCCIH-IU
aiv«;riAawl= 4 : ; . ,
CZilKrt .'C:.lHICHil«l OMIl'I.iTiPiKi-iS
- 11 — ill
.I,, I,']..»J
Uj.pLL'....
JPI b, .WIL / ‘
-Les I 1 f
. . w • !. ».. > , *. - :. ‘i . . I • .
. . rt .• •. . »• - • • . I . •
- nr- - -•> r-»- • ir t> je. f.
1 -n.r ri-c X -•:!«• .»s;» .r si"«s-s . -.saw; tFH -W~H ? 31 5" I - ; 'lg(L-l .
“ .' ills
34 MEMORANDUM
— SINCE 1953 —
1025 CREEKSIDE RIDGE DRIVE, SUITE 150, ROSEVILLE, CALIFORNIA 95678 PHONE (916) 773-1189 FAX (916) 773-2595 OFFICES: ROSEVILLE PLEASANTON
www.msce.com
Date: October 15, 2021 Project Number: 18512 and 18437
To: Ryan O’Keefe
From: Allison Wathen
Subject: Sierra View, WB-31, and WB-41 Water and Sewer Demands Message:
MacKay and Somps is processing a specific plan amendment and general plan amendment for Sierra View, Parcel WB-41 and Parcel WB-31 within the City of Roseville. Sierra View is located south of Diamond Oaks Road and north of Shasta Street. Parcel WB-41 is located south of Pleasant Grove Boulevard, west of Daylight Drive, and east of Santucci Boulevard. Parcel WB-31 is located north of Pleasant Grove Boulevard and east of Santucci Boulevard.
Sierra View is currently designated as a residential land use in the medium density residential (MDR) category and allocates 168 units. Parcel WB-41 is approximately 10.11 acres and is currently designated as commercial (CC) land use. Parcel WB-31 is approximately 11.1 acres and is currently designated as high density residential (HDR) land use with a current allocation of 263 units. This condition is referred to in the tables below as the “Approved Project” The applicant is proposing to change the land uses for these projects as follows:
• Sierra View: 75 low density residential (LDR) units
• Parcel WB-41: 63 (MDR) units
• Parcel WB-31: 293 HDR units
This proposed condition is referred to in the tables below as the “Proposed Project”.
MacKay and Somps has analyzed the changes in sanitary sewer flow and potable water demand based on the proposed land use designations and unit allocations. Table 1 below calculates and compares the sewer flow for the Approved Project and Proposed Project conditions. It has been determined that the proposed changes to the land use designations and unit allocations results in approximately 0.07 MDG less flow.
Table 2 below calculates and compares the total surface water required for the Approved Project and Proposed Project conditions. It has been determined that the proposed changes to the land use designations and unit allocations results in a reduced need for surface water, approximately 2.0 AFY less. These calculations have been confirmed with the City of Roseville in an email exchange dated June 23, 2021.
ADDENDUM ATTACHMENT 7
MEMORANDUM
— SINCE 1953 —
1025 CREEKSIDE RIDGE DRIVE, SUITE 150, ROSEVILLE, CALIFORNIA 95678 PHONE (916) 773-1189 FAX (916) 773-2595 OFFICES: ROSEVILLE PLEASANTON
www.msce.com
Best Regards,
MacKay & Somps Civil Engineers, Inc.
BY: Allison Wathen
cc: Eric Crow
APPROVED PROJECT ZONING ACRES
TOTAL
UNITS
FLOW
FACTOR Q(ADWF)
FACTORED
FLOW
PEAK
FACTOR Q(PWWF)
EDU GPD/EDU MG/D MG/D MG/D MG/D
PARCEL WB-41 CC 10.11 850 0.009 0.017 3.5 0.06
PARCEL WB-31 HDR 11.1 263 130 0.034 0.068 3.5 0.24
SIERRA VIEW MDR 23.1 168 190 0.032 0.064 3.5 0.22
0.52 PROPOSED PROJECT ZONING ACRES
TOTAL
UNITS
FLOW
FACTOR Q(ADWF)
FACTORED
FLOW
PEAK
FACTOR Q(PWWF)
EDU GPD/EDU MG/D MG/D MG/D MG/D
PARCEL WB-41 MDR 10.11 63 190 0.012 0.024 3.5 0.0838
PARCEL WB-31 HDR 11.1 293 130 0.038 0.076 3.5 0.2666
SIERRA VIEW LDR 23.1 75 190 0.014 0.029 3.5 0.10
0.45 0.07
Table 1 - Sewer
LESS FLOW
APPROVED PROJECT ZONING ACRES UNITS DENSITY
DEMAND
FACTOR
PROJECTED
DEMAND (MGD)
TOTAL
AFY
ANNUAL
IRRIGATION
DEMAND
% SITE
IRRIGATED RW AFY
TOTAL
SURFACE
WATER
PARCEL WB-41 CC 10.11 2598 0.03 29.42 3.60 0.30 10.92 18.50 PARCEL WB-31 HDR 11.1 263 23.7 177 0.05 52.14 3.60 0.40 15.98 36.15 SIERRA VIEW MDR 23.1 168 7.3 430 0.07 80.91 0.00 80.91
135.56
PROPOSED PROJECT ZONING ACRES UNITS DENSITY
DEMAND
FACTOR
PROJECTED
DEMAND (MGD)
TOTAL
AFY
ANNUAL
IRRIGATION
DEMAND
% SITE
IRRIGATED RW AFY
TOTAL
SURFACE
WATER
PARCEL WB-41 MDR 10.11 63 6.2 430 0.0271 30.3 0.00 30.34 PARCEL WB-31 HDR 11.1 293 26.4 177 0.052 58.1 3.60 0.4 15.98 42.10 SIERRA VIEW LDR 23.1 75 3.2 728 0.055 61.2 0.00 61.15
133.59
-2.0
Table 2 - Water
ADDITIONAL WATER REQUIRED
ADDENDUM ATTACHMENT 8
APPLICABLE MITIGATION MEASURES
from the Sierra Vista Specific Plan EIR
Mitigation Measure Implementation Timing
Reviewing
Party
Documents to
be Submitted
to the City
Staff Use
Only
SVSP EIR MM 4.1-2. Agricultural Conversion Policies
One acre of open space shall be preserved within Placer County for each acre of open space impacted within the Specific Plan area. This is to be accomplished through the recordation of conservation easements that result in the formation of preserve lands (as a “mitigation property or “preserve site” and collectively, “mitigation lands” or “preserve lands”). For the purposes of assessing impacts associated with a specific development project, “open space” impacts shall include all land proposed to be developed for urban uses.
For purposes of mitigation for the specific development project, the term “open space” shall include any and all undeveloped land proposed to be preserved by conservation easement or otherwise required by any governmental agency to be preserved for any reason, specifically including all lands preserved for habitat or agricultural mitigation is required beyond the 1:1 open space requirement noted above, as long as a substantial portion, as determined by the Planning Director, of the mitigation lands acquired are (1) in agricultural production, (2) are undeveloped and have the same or higher value CDC categorization as lands being affected within the Specific Plan property at issue.
In-kind mitigation is not required for agricultural land development within the Specific Plan area.
The Applicant shall be
responsible for securing
the offsite grassland
mitigation prior to
approval of tentative
maps proportional to
the development
proposed.
Prior to the
issuance of
a Grading
Permit.
Planning
Director,
City Open
Space
Preserve
Manager,
and CDD
Director
Documentation
of conservation
easements
SVSP EIR MM 4.3-1. Roseville Intersections: Pay Fair Share of Improvements in the CIP including Improvements to [] Intersections
• Fiddyment/Baseline Road: improve intersection as part of the project • Watt Avenue/Baseline Road: improve intersection as part of the project Improvements would be necessary to the following intersections, as part of the project to achieve acceptable service levels under the 2025 CIP plus Project scenario. However, as noted, many intersections cannot be mitigated because of constraints.
1. Foothills Boulevard and Baseline Road: No feasible mitigation
2. Industrial Avenue and Alantown Drive: No feasible mitigation
3. Cirby Way and Northridge Drive: No feasible mitigation The Development
Agreements between
Applicant and the City,
require the City to
update the CIP and the
Applicants to pay fair
share fees.
In
accordance
with
Developme
nt
Agreement
s, the traffic
mitigation
fees shall
be paid on
a pro-rata
basis prior
to the
issuance of
Public
Works
Director
Project will pay
fair share of
fees
APPLICABLE MITIGATION MEASURES
from the Sierra Vista Specific Plan EIR
Mitigation Measure Implementation Timing
Reviewing
Party
Documents to
be Submitted
to the City
Staff Use
Only
4. Foothills Boulevard and Junction Boulevard: No feasible mitigation
5. Junction Boulevard and Baseline Road: No feasible mitigation
6. Roseville Parkway and Sierra College Boulevard: No feasible mitigation
7. Blue Oaks Boulevard and Crocker Ranch Road: Re-stripe to include two south bound to east bound left turn lanes and a separate right turn. This improvement shall be added to the City of Roseville’s Capital Improvement program. Development within the Sierra Vista Specific Plan Area shall be required to pay fair share costs for this improvement
8. Blue Oaks Boulevard and New Meadow Drive: Re-stripe the southbound through lane to a shared through and left-turn lane. This improvement shall be added to the City of Roseville’s Capital Improvement program. Development within the Sierra Vista Specific Plan Area shall be required to pay fair share costs for this improvement. As such, this impact would be reduced to less than significant.
9. Foothills Boulevard and Baseline/Main: No feasible mitigation
10. Sunrise Boulevard and Sandringham/Kensinton: add a dedicated southbound right-turn lane
11. Woodcreek Oaks and Baseline Road: construction of a second eastbound through lane. This improvement is currently in the City’s CIP program. SVSP would be required to pay fair share costs for this improvement.
The SVSP will develop over a period of years. Therefore, the impacts on these impacts would occur over a period of time. As with other improvements in the 2025 CIP, the City shall monitor traffic conditions and determine when specific improvements are needed. The City of Roseville’s traffic impact fees should be revised to include the SVSP area. The City of Roseville’s Traffic Impact Fees should be revised to include the SVSP. Specific Plans and/or development proposals shall provide for fair share contributions of the cost of the improvements through the updated traffic impact fees.
Construction of intersection improvements could have impacts on biological and cultural resources, air quality, water quality, and noise levels. These impacts will be evaluated as part of the CIP update to incorporate the adopted mitigation. any
building
permit.
SVSP EIR MM 4.3-6. State Facilities Segments: Pay Fair Share Costs No specific improvements have been identified to mitigate project The City and Sutter
County shall implement
a regional traffic fee to
fund the identified
improvements.
Payment of
applicable
fees by the
Applicant
at the time
Sutter
County
Public
Works
Director
Project will pay
fair share of
fees
APPLICABLE MITIGATION MEASURES
from the Sierra Vista Specific Plan EIR
Mitigation Measure Implementation Timing
Reviewing
Party
Documents to
be Submitted
to the City
Staff Use
Only
impacts on I-80, SR 70/99, or SR 65; however, the City is willing to work with Caltrans & the Placer County Transportation Planning Agency (PCTPA) to establish a regional approach to institute a fee program for the purpose of funding improvements on these facilities. If and when Caltrans and the City enter into an enforceable agreement, the Project shall pay impact fees to the City of Roseville in amounts that constitute the Project’s fair share contributions to the construction of transportation facilities and/or improvements, consistent with the Mitigation Fee Act (Gov. Code, § 66000
et seq.). The City shall determine the means of providing the project’s fair share of the funds for these improvements to Caltrans through the inter-agency agreement or other arrangement required by Mitigation Measure 4.3-7.
Applicant within the
SVSP shall be required
to contribute to the
regional fee to fund a
portion of the
improvements per the
Development
Agreements. The State
shall be responsible for
overseeing the
improvements.
of each
building
permit.
and the
City Public
Works
Director
SVSP EIR MM 4.3-7. Sutter County Facilities: Pay Fair Share Costs • Reigo Road and Pleasant Grove South
• Riego Road and Pleasant Grove North
• Riego Road
The City of Roseville shall negotiate in good faith to enter into a fair agreement with Sutter County regarding Sierra Vista’s fair share mitigation for this improvement. In reaching an accommodation with Sutter County, the City and Sutter County, in order to better ensure an effective sub-regional approach to mitigating transportation-related impacts, may choose to include within the same agreements or Joint Powers Authority additional public agencies with whom it must work to mitigate transportation-related impacts, such as Placer County, Sacramento County, and Caltrans. As the City strives to achieve agreement(s) with one or more of these other agencies, the City shall insist that “fair share” fee obligations be reciprocal, in the sense that the other local agencies, in accepting fair share contributions from the SVSP developers, must agree to require new development occurring in their own jurisdictions to make fair share contributions towards mitigation the significant effects of such development on the City’s transportation network. Any such arrangement(s), with just Sutter County or with additional agencies, shall account for existing inter-agency fee programs in order to avoid requiring redundant mitigation or fee payments exceeding fair share mitigation levels. The City intends that its arrangement(s) with Sutter County and any other agencies shall permit the participating agencies flexibility in providing cross-jurisdictional credits and reimbursements consistent with the general “fair share” mitigation standard, and The City and Sutter
County shall implement
a regional traffic fee to
fund the identified
improvements.
Applicant within the
SVSP shall be required
to contribute to the
regional fee to fund a
portion of the
improvements per the
Development
Agreements. Sutter
County shall be
responsible for
overseeing the
improvements.
Payment of
fees by the
Applicant
at the time
of each
building
permit.
Sutter
County
Public
Works
Director
and the
City Public
Works
Director
Project will pay
fair share of
fees
APPLICABLE MITIGATION MEASURES
from the Sierra Vista Specific Plan EIR
Mitigation Measure Implementation Timing
Reviewing
Party
Documents to
be Submitted
to the City
Staff Use
Only
require an updated model run incorporating the best available information in order to obtain the most accurate, up-to-date impact assessment feasible and to generate the most accurate, up-to-date estimates of regional fair share contributions. These arrangements, moreover, should also include provisions that allow for periodic updates to the traffic modeling on which fair share payment calculations depend in order to account for (i) newly approved projects cumulatively contributing to transportation-related impacts and that therefore should contribute to the funding of necessary improvements (e.g., the Curry Creek Community Plan in Placer County), (ii) additional physical improvements necessitated in whole or in part by newly approved projects, (iii) changing cost calculations for the construction of needed improvements based on changes in the costs of materials, labor, and other inputs. Implementation of MM 4.3-8 would reduce impacts to a less than significant level; however, these improvements lie outside the jurisdiction of the City of Roseville. As such, this impact is considered significant and unavoidable.
SVSP EIR MM 4.4-1. Dust and Construction Control Policies In accordance with the PCAPCD, the applicant shall comply with all applicable rules and regulations as listed above (e.g., Rule 202, 218 and 228). In addition, at the time of tentative map the applicant(s) shall implement a minimum of five (5) of the following measures unless superseded by state or other more stringent standards:
The following mitigation measures shall be implemented to reduce short-term construction-related air quality impacts. In addition, dust control measures are required to be implemented by all projects in accordance with the City of Roseville Grading Ordinance, and the PCAPCD Fugitive Dust Rule 228. • Applicant shall submit to PCAPCD a Construction Emission / Dust Control Plan within 30 days prior to groundbreaking. If the PCAPCD does not respond within 20 days, the plan shall be considered approved. The plan must address the minimum requirements found in section 300 and 400 of District Rule 228, Fugitive Dust (www.placer.ca.gov/airpollution/a irpolut.htm). The applicant shall keep a hard or electronic copy of Rule 228, Fugitive Dust on-site for reference. • The Construction Emission/Dust Control Plan shall include a comprehensive inventory (i.e. make, model, year, emission rating) of all heavy-duty off-road equipment (50 horsepower (HP) of greater) that will be used an aggregate of 40 or more hours for the construction project. The project representative shall The Applicant shall
submit construction
management plans as
part of the Grading
Permit application. The
Public Works Director
shall review grading
plans for inclusion of
these measures prior to
issuance of grading
permits. The City Code
Enforcement Officer
shall respond to
complaints.
Prior to
issuance of
Grading
Permits.
Director of
Public
Works
Dust Control
Plan and proof
of submittal to
PCAPCD
APPLICABLE MITIGATION MEASURES
from the Sierra Vista Specific Plan EIR
Mitigation Measure Implementation Timing
Reviewing
Party
Documents to
be Submitted
to the City
Staff Use
Only
provide PCAPCD with the anticipated construction timeline including start date, and name and phone number of the project manager and on-site foreman. The plan shall demonstrate that the heavy-duty (> 50 HP) off-road vehicles to be used in the construction project, including owned, leased and subcontractor vehicles, will achieve a project wide fleet-average 20% NOX reduction and 45% particulate reduction compared to the most recent ARB fleet average. PCAPCD shall be contacted for average fleet emission data. Acceptable options for reducing emissions may include use of late model engines, low-emission diesel products, alternative fuels, engine retrofit technology, after-treatment products, and/or other options as they become available. Contractors can access the Sacramento Metropolitan Air Quality Management District’s web site to determine if their off-road fleet meets the requirements listed in this measure (http://www.airquality.org/ceqa/Construction_Mitigation_Calculator.xls).
The following measures are also included to reduce construction-related ROG, Nox, PM10 and PM2.5 emissions:
• All construction equipment shall be maintained in good operating condition.
Contractor shall ensure that all construction equipment is being properly serviced and maintained as per the manufacturer’s specifications. Maintenance records shall be available at the construction site for verification. This measure will reduce combustion emissions of all criteria air pollutants. • Prior to the issuance of any grading permits, all applicants shall submit construction plans denoting the proposed schedule and projected equipment use. Construction contractors shall provide evidence that low emission mobile construction will be used, or that their use was investigated and found to be infeasible for the project. Low emission equipment is defined as meeting the California Air Resources Board’s Tier III standards. Contractors shall also conform to any construction measures imposed by the PCAPCD as well as City Planning Staff. This measure will primarily reduce ROG, Nox, PM10, and PM2.5 exhaust emissions.
• Paints and coating shall be applied either by hand or by high volume, lowpressure spray. This measure will reduce evaporative ROG emissions. • All construction shall comply with the following measures to reduce fugitive dust related emissions of PM10 and PM2.5:
o Maintain a minimum 24-inch freeboard on soil haul trucks or cover payloads using tarps or other suitable means.
o Suspend grading operations during high winds (greater than 15 mph).
APPLICABLE MITIGATION MEASURES
from the Sierra Vista Specific Plan EIR
Mitigation Measure Implementation Timing
Reviewing
Party
Documents to
be Submitted
to the City
Staff Use
Only
o Sweep streets as necessary if silt is carried off-site to adjacent public thoroughfares or occurs as a result of hauling.
o Dispose of surplus excavated material in accordance with local ordinances and use sound engineering practices.
o Schedule activities to minimize the amounts of exposed excavated soil during and after the end of work periods.
o Phase grading into smaller areas to prevent the susceptibility of larger areas to erosion over extended periods of time.
o Pave or apply gravel to any on-site haul roads.
o Reestablish ground cover on the construction site through seeding and water.
o Clean earth moving construction equipment with water or sweep clean, once per day, or as necessary (e.g., when moving onsite), consistent with National Pollutant Discharge Elimination System Best Management Practices and the Roseville Grading Ordinance. Water shall be applied to control dust as needed to prevent dust impacts offsite. Operational water truck(s), shall be on-site, as required, to control fugitive dust. Construction vehicles leaving the site shall be cleaned, as needed, to prevent dust, silt, mud, and dirt from being released or tracked off-site.
o Spread soil binders on unpaved roads and employee/equipment parking areas. Soil binders shall be non-toxic in accordance with state and local regulations. Apply approved chemical soil stabilizers, or vegetated mats, etc. according to manufacturers’ specifications, to all-inactive construction areas (previously graded areas which remain inactive for 96 hours). o Minimize diesel idling time to a maximum of five minutes. o Utilize existing power sources (e.g., power poles) or clean fuel generators rather than temporary diesel power generators, if feasible. o An applicant representative, ARB-certified to perform Visible Emissions Evaluations (VEE), shall routinely (i.e., once per week) evaluate project related off-road and heavy-duty on-road equipment emissions for compliance with this requirement for projects grading more than 20 acres in size, regardless of how many acres are to be disturbed daily. o Construction equipment exhaust emissions shall not exceed the PCAPCD Visible Emissions Rule 202. Fugitive dust is not to exceed 40% opacity and not go beyond property boundary at any time. Operators of vehicles and
APPLICABLE MITIGATION MEASURES
from the Sierra Vista Specific Plan EIR
Mitigation Measure Implementation Timing
Reviewing
Party
Documents to
be Submitted
to the City
Staff Use
Only
equipment found to exceed opacity limits are to be immediately notified and the equipment must be repaired within 72 hours.
The City of Roseville is currently working with the Placer County Pollution Control District to update the standard mitigation measures. The following measures will likely be required at the time specific development is proposed. 1c. Prior to approval of Grading/ plans the applicant shall submit a Construction Emission / Dust Control Plan to the Placer County APCD. The plan must be submitted by certified mail, or receive a date stamp or other submittal proof.
This plan must address the minimum Administrative Requirements found in section 300 and 400 of APCD Rule 228, Fugitive Dust. The applicant shall not break ground prior to receiving APCD approval of the Construction Emission/Dust Control Plan. If the applicant has submittal proof of submittal and no response is received from the District within 20 working days the plan shall be deemed complete, and construction may begin.
1c. Include the following standard note on the Improvement/Grading Plan: The prime contractor shall submit to the District a comprehensive inventory (i.e. make, model, year, emission rating) of all the heavy-duty off-road equipment (50 horsepower of greater) that will be used an aggregate of 40 or more hours for the construction project. If any new equipment is added after submission of the inventory, the prime contractor shall the prime contractor shall contact the APCD prior to the new equipment being utilized. At least three business days prior to the use of subject heavy-duty off-road equipment, the project representative shall provide the District with the anticipated construction timeline including start date, and name and phone number of the property owner, project manager, and on-site foreman.
1c. Prior to approval of Grading/Improvement Plans, the applicant shall provide a plan to the Placer County APCD for approval by the District demonstrating that the heavy-duty (> 50 horsepower) off-road vehicles to be used in the construction project, including owned, leased and subcontractor vehicles, will achieve a project wide fleet-average 20 percent Nox reduction and 45 percent particulate reduction compared to the most recent CARB fleet average.
Acceptable options for reducing emissions may include use of late model engines, low-emission diesel products, alternative fuels, engine retrofit technology, after-treatment products, and/or other options as they become available.
2. Include the following standard note on the Improvement/Grading Plan: If required by the Public Works Department, the contractor shall hold a pre-
APPLICABLE MITIGATION MEASURES
from the Sierra Vista Specific Plan EIR
Mitigation Measure Implementation Timing
Reviewing
Party
Documents to
be Submitted
to the City
Staff Use
Only
construction meeting prior to grading activities. The contractor shall invite the Placer County APCD to the pre-construction meeting in order to discuss the construction emission/dust control plan with employees and/or contractors.
3. Prior to building permit approval, the applicant shall show, on the plans submitted to the Building Department, that electrical outlets shall be installed on the exterior walls of both the front and back of all residences or all commercial buildings to promote the use of electric landscape maintenance equipment.
4. Prior to building permit approval, the applicant shall show, on the plans submitted to the Building Department, provisions for construction of new residences, and where natural gas is available, the installation of a gas outlet for use with outdoor cooking appliances, such as a gas barbecue or outdoor recreational fire pits.
5. Prior to building permit approval, in accordance with District Rule 225, only U.S. EPA Phase II certified wood burning devices shall be allowed in singlefamily residences. The emission potential from each residence shall not exceed a cumulative total of 7.5 grams per hour for all devices. Masonry fireplaces shall have either an EPA certified Phase II wood burning device or shall be a U.L.
Listed Decorative Gas Appliance. (Rule 225)
6. Wood burning or Pellet appliances shall not be permitted in multi-family developments. Only natural gas or propane fired fireplace appliances are permitted. These appliances shall be clearly delineated on the Floor Plans submitted in conjunction with the Building Permit application. (Rule 225 / section 302.2)
7. Prior to the issuance of a Building Permit, the applicant shall show that all flat roofs with parapets shall include a white or silver cap sheet to reduce energy demands.
8. Diesel trucks shall be prohibited from idling more than five minutes. Prior to the issuance of a Building Permit, the applicant shall show that all truck loading and unloading docks shall be equipped with one 110/208 volt power outlet for every two dock doors. Diesel Trucks idling for more than five minutes shall be required to connect to the 110/208 volt power to run any auxiliary equipment. 2’x3’ signage which indicates “Diesel engine Idling Limited to a Maximum of 5 Minutes” shall be shown on the building elevations and shall be submitted to the Placer County APCD prior to the issuance of Building Permits for the project.
9. Prior to approval of Improvement Plans, an enforcement plan shall be established, and submitted to the APCD for review, in order to evaluate project-
APPLICABLE MITIGATION MEASURES
from the Sierra Vista Specific Plan EIR
Mitigation Measure Implementation Timing
Reviewing
Party
Documents to
be Submitted
to the City
Staff Use
Only
related on-and-off- road heavy-duty vehicle engine emission opacities on a weekly basis, using standards as defined in California Code of Regulations, Title 13, Sections 2180 – 2194. An Environmental Coordinator, hired by the prime contractor or property owner, and who is CARB-certified to perform Visible Emissions Evaluations (VEE), shall routinely evaluate project related offroad and heavy duty on-road equipment emissions for compliance with this requirement. Operators of vehicles and equipment found to exceed opacity limits will be notified by APCD and the equipment must be repaired within 72 hours. (California Code of Regulations, Title 13, Sections 2180 – 2194) PCAPCD Rules (Existing District requirements to be added as construction notes or referenced in conditions of approval)
New Standard Condition of Approval (for all projects): The project shall comply with all applicable Placer County Air Pollution Control District rules and regulations, and shall obtain applicable permits and/or clearances from the District prior to the start of construction.
The following air quality notes shall be added to the grading and/or improvement plans:
• The contractor shall use CARB ultra low sulfur diesel fuel for all diesel– powered equipment. In addition, low sulfur fuel shall be utilized for all stationary equipment. (California Standards for Motor Vehicle Diesel Fuel, title 13, article
4.8, chapter 9, California Code of Regulations).
• Processes that discharge 2 pounds per day or more of air contaminants, as defined by Health and Safety Code Section 39013, to the atmosphere may require a permit. Permits are required for both construction and operation.
Developers/contractors should contact the District prior to construction and obtain any necessary permits prior to the issuance of a Building Permit. (Rule 501)
• Pursuant to the Placer County Air Pollution Control District Rule 501, General Permit Requirements, the proposed project may need a permit from the District prior to construction. In general, any engine greater than 50 brake horsepower or any boiler with heat greater than 1,000,000 Btu per hour shall require a permit issued by the District. (Rule 501)
• All on-site stationary equipment which is classified as 50 hp or greater shall either obtain a state issued portable equipment permit or a Placer County APCD issued portable equipment permit. (California Portable Equipment Air Quality
APPLICABLE MITIGATION MEASURES
from the Sierra Vista Specific Plan EIR
Mitigation Measure Implementation Timing
Reviewing
Party
Documents to
be Submitted
to the City
Staff Use
Only
Registration Program, Section 2452).
• The contractor shall utilize existing power sources (e.g., power poles) or clean fuel generators rather than temporary diesel power generators if feasible. • During construction, the contractor shall minimize idling time to a maximum of 5 minutes for all diesel powered equipment.
• During construction, traffic speeds on all unpaved surfaces shall be limited to 15 miles per hour or less. (Rule 228 / section 401.2)
Contact the APCD prior to the new equipment being utilized. At least three business days prior to the use of subject heavy-duty off-road equipment, the project representative shall provide the District with the anticipated construction timeline including start date, and name and phone number of the property owner, project manager, and on-site foreman.
1. Prior to approval of Grading/Improvement Plans, the applicant shall provide a plan to the Placer County APCD for approval by the District demonstrating that the heavy-duty (> 50 horsepower) off-road vehicles to be used in the construction project, including owned, leased and subcontractor vehicles, will achieve a project wide fleet-average 20 percent Nox reduction and 45 percent particulate reduction compared to the most recent CARB fleet average.
Acceptable options for reducing emissions may include use of late model engines, low-emission diesel products, alternative fuels, engine retrofit technology, after-treatment products, and/or other options as they become available.
2. Include the following standard note on the Improvement/Grading Plan: If required by the Public Works Department, the contractor shall hold a preconstruction meeting prior to grading activities. The contractor shall invite the Placer County APCD to the pre-construction meeting in order to discuss the construction emission/dust control plan with employees and/or contractors.
3. Prior to building permit approval, the applicant shall show, on the plans submitted to the Building Department, that electrical outlets shall be installed on the exterior walls of both the front and back of all residences or all commercial buildings to promote the use of electric landscape maintenance equipment.
4. Prior to building permit approval, the applicant shall show, on the plans submitted to the Building Department, provisions for construction of new residences, and where natural gas is available, the installation of a gas outlet for use with outdoor cooking appliances, such as a gas barbecue or outdoor recreational fire pits.
APPLICABLE MITIGATION MEASURES
from the Sierra Vista Specific Plan EIR
Mitigation Measure Implementation Timing
Reviewing
Party
Documents to
be Submitted
to the City
Staff Use
Only
5. Prior to building permit approval, in accordance with District Rule 225, only U.S. EPA Phase II certified wood burning devices shall be allowed in singlefamily residences. The emission potential from each residence shall not exceed a cumulative total of 7.5 grams per hour for all devices. Masonry fireplaces shall have either an EPA certified Phase II wood burning device or shall be a U.L.
Listed Decorative Gas Appliance. (Rule 225)
6. Wood burning or Pellet appliances shall not be permitted in multi-family developments. Only natural gas or propane fired fireplace appliances are permitted. These appliances shall be clearly delineated on the Floor Plans submitted in conjunction with the Building Permit application. (Rule 225 / section 302.2)
7. Prior to the issuance of a Building Permit, the applicant shall show that all flat roofs with parapets shall include a white or silver cap sheet to reduce energy demands.
8. Diesel trucks shall be prohibited from idling more than five minutes. Prior to the issuance of a Building Permit, the applicant shall show that all truck loading and unloading docks shall be equipped with one 110/208 volt power outlet for every two dock doors. Diesel Trucks idling for more than five minutes shall be required to connect to the 110/208 volt power to run any auxiliary equipment. 2’x3’ signage which indicates “Diesel engine Idling Limited to a Maximum of 5 Minutes” shall be shown on the building elevations and shall be submitted to the Placer County APCD prior to the issuance of Building Permits for the project.
9. Prior to approval of Improvement Plans, an enforcement plan shall be established, and submitted to the APCD for review, in order to evaluate projectrelated on-and-off- road heavy-duty vehicle engine emission opacities on a weekly basis, using standards as defined in California Code of Regulations, Title 13, Sections 2180 – 2194. An Environmental Coordinator, hired by the prime contractor or property owner, and who is CARB-certified to perform Visible Emissions Evaluations (VEE), shall routinely evaluate project related offroad and heavy duty on-road equipment emissions for compliance with this requirement. Operators of vehicles and equipment found to exceed opacity limits will be notified by APCD and the equipment must be repaired within 72 hours. (California Code of Regulations, Title 13, Sections 2180 – 2194) PCAPCD Rules (Existing District requirements to be added as construction notes or referenced in conditions of approval)
New Standard Condition of Approval (for all projects): The project shall comply with all applicable Placer County Air Pollution Control District rules and
APPLICABLE MITIGATION MEASURES
from the Sierra Vista Specific Plan EIR
Mitigation Measure Implementation Timing
Reviewing
Party
Documents to
be Submitted
to the City
Staff Use
Only
regulations, and shall obtain applicable permits and/or clearances from the District prior to the start of construction.
The following air quality notes shall be added to the grading and/or improvement plans:
• The contractor shall use CARB ultra low sulfur diesel fuel for all diesel– powered equipment. In addition, low sulfur fuel shall be utilized for all stationary equipment. (California Standards for Motor Vehicle Diesel Fuel, title 13, article
4.8, chapter 9, California Code of Regulations).
• Processes that discharge 2 pounds per day or more of air contaminants, as defined by Health and Safety Code Section 39013, to the atmosphere may require a permit. Permits are required for both construction and operation.
Developers/contractors should contact the District prior to construction and obtain any necessary permits prior to the issuance of a Building Permit. (Rule 501)
• Pursuant to the Placer County Air Pollution Control District Rule 501, General Permit Requirements, the proposed project may need a permit from the District prior to construction. In general, any engine greater than 50 brake horsepower or any boiler with heat greater than 1,000,000 Btu per hour shall require a permit issued by the District. (Rule 501)
• All on-site stationary equipment which is classified as 50 hp or greater shall either obtain a state issued portable equipment permit or a Placer County APCD issued portable equipment permit. (California Portable Equipment Registration Program, Section 2452).
• The contractor shall utilize existing power sources (e.g., power poles) or clean fuel generators rather than temporary diesel power generators if feasible. • During construction, the contractor shall minimize idling time to a maximum of 5 minutes for all diesel powered equipment.
• During construction, traffic speeds on all unpaved surfaces shall be limited to 15 miles per hour or less. (Rule 228 / section 401.2)
SVSP EIR MM 4.5-1. Reduction of Operational Emissions
Implementation of the Air Quality Mitigation Measures listed in Section 4.3 Air Quality would reduce operational and construction-related emissions of criteria air pollutants and precursors, and would also act to reduce GHG emissions The Applicant shall
submit construction
management plans as
part of the Grading
Permit application. The
Public Works Director
Prior to
issuance of
Grading
Permits.
Director of
Public
Works
Operational
Emissions Plan
APPLICABLE MITIGATION MEASURES
from the Sierra Vista Specific Plan EIR
Mitigation Measure Implementation Timing
Reviewing
Party
Documents to
be Submitted
to the City
Staff Use
Only
associated with project construction and operation. Mitigation Measure 4.4-1 found in the Air Quality section of this EIR, is relevant to impact 4.5-1 because both criteria air pollutant and GHG emissions are frequently associated with combustion byproducts. In addition, the City shall implement the following measures to reduce direct and indirect GHG emissions associated with the proposed project. Certain measures would already be components of the project (i.e., Specific Plan policies, design guidelines and standards), and/or would be applied consistent with the City’s General Plan Policies, addressing GHG emissions and climate change, but are provided here for purposes of completeness.
shall review grading
plans for inclusion of
these measures prior to
issuance of grading
permits. The City Code
Enforcement Officer
shall respond to
complaints.
In addition, plans will be
reviewed by the Placer
County Air Pollution
Control District for
compliance with their
rules and regulations.
SVSP EIR MM 4.5-2. Additional Measures to Reduce GHG Emissions For each new development within the project site requiring a discretionary approval (e.g., tentative subdivision map, conditional use permit), the City shall impose mitigation measures that reduce GHG emissions to the extent feasible and to the extent appropriate with respect to the state’s progress at the time toward meeting GHG emissions reductions required by the California Global Warming Solutions Act of 2006 (AB 32).
The City shall require feasible reduction measures that, in combination with existing and future regulatory measures developed under AB 32, will reduce GHG emissions associated with the operation of developments and supporting infrastructure that are part of the proposed project by 30% from business-asusual emissions levels projected for 2025, if feasible.
The Applicant shall
submit construction
management plans as
part of the Grading
Permit application. The
Public Works Director
shall review grading
plans for inclusion of
these measures prior to
issuance of grading
permits. The City Code
Enforcement Officer
shall respond to
complaints.
In addition, plans will be
reviewed by the Placer
County Air Pollution
Control District for
compliance with their
rules and regulations.
Prior to
issuance of
Grading
Permits.
Director of
Public
Works
Construction
Management
Plan
SVSP EIR MM 4.6-1. Construction Noise Reduction These measures shall be included on building
plans. The Chief
Prior to
approval of
grading
Chief
Building
Inspector,
Measures shall
be located on
APPLICABLE MITIGATION MEASURES
from the Sierra Vista Specific Plan EIR
Mitigation Measure Implementation Timing
Reviewing
Party
Documents to
be Submitted
to the City
Staff Use
Only
MM 4.6-1(a): Construction activities shall comply with the requirements of the City of Roseville Noise Ordinance.
MM4.6-1(b): Locate fixed construction equipment such as compressors and generators as far as possible from sensitive receptors. Shroud or shield all impact tools, and muffle or shield all in-take and exhaust ports on power construction equipment.
MM 4.6-1(c): Designate a construction disturbance coordinator and conspicuously post the Coordinator’s contact information around the project site and in adjacent public spaces. The disturbance coordinator will receive all public complaints about construction noise disturbances, and will be responsible for determining the cause of the complaint, and implementing any feasible measures to be taken to alleviate the problem.
MM 4.6-1(d): Well drilling shall occur prior to construction of the adjacent subdivision, to the extent feasible. If construction timing for the wells occurs after subdivision construction, then measures to reduce noise shall include; hanging flexible sound control curtains around the drilling apparatus, and the drill rig, to the degree feasible, as determined by the Environmental Utilities Director, if located within 1,000-feet of an occupied residence.
Building Inspector shall
review plans for
inclusion of these
measures prior to
issuance of building
permits. The Code
Enforcement Inspector
shall respond to
complaints.
permits
and/or
building
permits.
Building
Official,
Code
Enforceme
nt
Inspector
Building Permit
Plans
SVSP EIR MM 4.8-3. Avoid Nesting Sites
To ensure that fully protected bird and raptor species are not injured or disturbed by construction in the vicinity of nesting habitat, the project applicant shall implement the following measures:
Raptors
a) When feasible, all tree removal shall occur between August 30th and February 15th to avoid the breeding season of any raptor species that could be using the area, and to discourage hawks from nesting in the vicinity of an upcoming construction area.
b) For Swainson’s hawk, if avoidance of tree removal outside the breeding season is not feasible, and a nest is present, the applicants would be required to obtain a 2081 permit from CDFG to mitigate for potential “take” under CESA.
If no nesting is occurring, a take permit would not be required. c) Prior to the beginning of mass grading, including grading for major infrastructure improvements, during the period between February 15th and August 30th, all trees and potential burrowing owl habitat within 350 feet of any grading or earthmoving activity shall be surveyed for active raptor nests or burrows by a qualified biologist no more than 30-days prior to disturbance. If Results of
preconstruction surveys
shall be submitted to
the Chief Building
Inspector prior to the
issuance of a grading
permit. Applicable
construction restrictions
shall be reflected within
building plans. The
applicants shall prepare
annual reports on the
status and success of
mitigation and shall
submit these reports to
USFWS and CDFG.
The applicants shall
coordinate with USFWS
and CDFG to modify as
Prior to
approval of
grading
and
building
permits.
Chief
Building
Inspector,
Building
Official,
Code
Enforceme
nt
Inspector,
Environme
ntal
Coordinato
r
Nesting Bird
Surveys
APPLICABLE MITIGATION MEASURES
from the Sierra Vista Specific Plan EIR
Mitigation Measure Implementation Timing
Reviewing
Party
Documents to
be Submitted
to the City
Staff Use
Only
active raptor nests or burrows are found, and the site is within 350-feet of potential construction activity, a highly visible temporary fence shall be erected around the tree or burrow(s) at a distance of up to 350-feet, depending on the species, from the edge of the canopy to prevent construction disturbance and intrusions on the nest area.
d) Preconstruction and non-breeding season exclusion measures shall be developed in consultation with CDFG, and shall preclude burrowing owl occupation of the portions of the project site subject to disturbance such as grading. Burrowing owls may be passively excluded from burrows in construction areas by placing one-way doors in the burrows according to CDFG protocol. The one-way doors must be in place for a minimum of three days. All burrows that may be occupied by burrowing owls regardless of whether they exhibit signs of occupation must be cleared with the one way doors. Burrows that have been cleared through the use of the one-way doors shall then be closed or backfilled to prevent owls from entering the burrow. e) No construction vehicles shall be permitted within restricted areas (i.e., raptor protection zones) unless directly related to the management or protection of the legally protected species.
f) If a legally protected species nest is located in a tree designated for removal, the removal shall be deferred until after August 30th or until the adults and young of the year are no longer dependent on the nest site as determined by a qualified biologist.
Black Rails and Tri-colored Blackbirds
Prior to earth moving that would disturb marsh habitat, a qualified biologist shall conduct surveys to determine the presence of the California black rail. If either of these species is found, all earth moving within 250 feet shall stop and measures, including establishing nest protection buffers along both sides of Curry Creek during the nesting season (generally February 1 through August 31st) shall be implemented.
Rookeries
No heron rookeries are present within the plan area. Prior to earthmoving that would disturb marsh habitat or tree removal of the eucalyptus grove, preconstruction surveys should be conducted to verify that no rookeries have been established. If rookeries are present all earth moving within 250-feet shall stop, during the breeding season.
necessary any
mitigation plans in an
effort to attain
mitigation success.
APPLICABLE MITIGATION MEASURES
from the Sierra Vista Specific Plan EIR
Mitigation Measure Implementation Timing
Reviewing
Party
Documents to
be Submitted
to the City
Staff Use
Only
SVSP EIR MM 4.8-4. Onsite and Offsite Grassland Preservation Swainson’s Hawk
a) CDFG recommends that projects that result in the loss of potential foraging habitat for Swainson’s hawk (which includes grasslands) within 10‐miles of an active nest site provide mitigation for that loss. To the extent feasible, strategies for preserving on‐site grasslands as raptor and migratory bird foraging habitat will be addressed in the Operations and Maintenance Plan prepared pursuant to the Section 404 Permit. Some of these strategies could include; but are not necessarily limited to, grazing for grassland management, monitoring for biological values, and adaptive management. Mitigation for Swainson’s hawk foraging habitat would concurrently mitigate for loss of habitat for a number of other wildlife species in the region such as burrowing owl, red‐tailed hawk, white‐tailed kite, northern harrier, Ferruginous hawk, and logger‐head shrike among others.
Based on information obtained through consultation with CDFG and otherwise, a Swainson’s Hawk Grassland Habitat Mitigation Plan shall be developed to mitigate for the loss of grassland foraging habitat, consistent with the ratios set forth in Table 4.8‐7. Areas within Placer County including the Toad Hill Mitigation Bank, the Western Placer Schools Mitigation Area and a portion of Koshman Ranch and other sites that will be located within Placer County via conservation easements or other mechanisms would provide a total of 1,036 upland/grassland acres. This would reduce the impacts to Swainson’s Hawk to a less than significant level.
[See Table 4.8-8 in SVSP EIR]
Long‐billed Curlew, Burrowing Owls
Mitigation for the Swainson’s hawk would ensure that adequate grassland is preserved at ratios identified in Table 4.8‐7. For foraging within one mile of an active nest, mitigation would be 1:1. Greater than a mile would be at an amount of .75:1. This would set aside adequate grassland that would reduce impacts from loss of grasslands to these species to a less than significant level.
The applicant shall
submit documentation
certifying that grassland
habitat has obtained to
the City’s
Environmental
Coordinator.
Prior to
grading
plan
approval.
Environme
ntal
Coordinato
r
Documentation
of
Conservation
Easements
SVSP EIR MM 4.8‐5. Wildlife Movement Protection Policies The Applicant shall enter into a Section
Prior to
approval of
NPDES
Coordinato
1600 Alteration
Agreement
APPLICABLE MITIGATION MEASURES
from the Sierra Vista Specific Plan EIR
Mitigation Measure Implementation Timing
Reviewing
Party
Documents to
be Submitted
to the City
Staff Use
Only
To protect the long term habitat of the stream channels and the WAPA corridor and their potential use by wildlife as movement corridors, the project applicants shall ensure that movement corridors are not obstructed. Through compliance with Section 1600 of the CDFG Code, the applicant(s) will enter into a Streambed Alteration Agreement prior to conducting any construction activities within a stream corridor, which sets forth mitigation measures that the applicant must implement. These measures shall include, but not be limited to; the use of either bridges or culverts that are large enough that wildlife have enough space to pass through road crossings without having to travel over the road surface, the implementation of bank stabilization measures, and/or restoration and revegetation of stream corridor habitat that has been damaged due to the project’s construction. Furthermore, the recreational trails shall be lined by post and rail fence and signage would be used to direct trail users to stay within the designated trail corridor. The trails would be closed after dark and no exterior lighting would be used. Lastly, the implementation of MM 4.8-1 which provides for the conservation of onsite open space along the WAPA corridor and the stream channels would ensure adequate opportunities for wildlife movement through the plan area.
1600 Streambed
Alteration Agreement
with CDFG. The City’s
NPDES Coordinator
shall ensure measures
are included in the
project to reduce water
quality impacts.
grading
permits.
r,
Environme
ntal
Coordinato
r
SVSP EIR MM 4.8‐7. Offsite Surveys
Prior to construction of any off- site infrastructure, a qualified biologist shall perform detailed, and if necessary, focused biological surveys of any undisturbed areas that would be affected by infrastructure development.
Because infrastructure for the proposed project would be located in road rightof-way, or undeveloped land similar to the project site, the biological resources that would be expected to occur would not differ substantially from those identified in this EIR. If it is determined that wetland resources or sensitive species would be impacted MM 4.8-1 and MM 4.8-2 shall be implemented, as appropriate to the resource. If it is determined that active nests exist within the off-site improvement location, MM 4.8-3 shall be implemented as appropriate to the species. If it is determined the off-site improvement is located within or adjacent to a wildlife movement corridor, MM 4.8-5 shall be implemented.
Appropriate biological
surveys, environmental
review, and appropriate
permits shall be
conducted in
accordance with
applicable rules and
regulations governing
the protection of listed
species.
Prior to
issuance of
grading
permit.
Public
Works
Director,
Environme
ntal
Coordinato
r
Biological
Survey
SVSP EIR MM 4.9-1. Cease Work and Consult with Qualified Archaeologist Should any cultural resources, such as structural features, any amount of bone or shell, artifacts, human remains, or architectural remains, be encountered This condition shall be
reflected in all
construction and
building plans. The
Public Works Director
Prior to
issuance of
grading
permit
and/or
Public
Works
Director,
Building
Official,
Measure to be
reflected on all
construction
plans
APPLICABLE MITIGATION MEASURES
from the Sierra Vista Specific Plan EIR
Mitigation Measure Implementation Timing
Reviewing
Party
Documents to
be Submitted
to the City
Staff Use
Only
during any subsurface development activities, work shall be suspended within 100-feet of the find. The City of Roseville Planning and Public Works Staff shall be immediately notified. At that time, the City of Roseville shall coordinate any necessary investigation of the site with qualified archaeologists as needed, to assess the resource (i.e., whether it is an “historical resource” or a “unique archaeological resource”) and provide proper management recommendations should potential impacts to the resources be found to be significant. Possible management recommendations for important resources could include resource avoidance or, where avoidance is infeasible in light of project design or layout or is unnecessary to avoid significant effects, data recovery excavations. The contractor shall implement any measures deemed feasible and necessary by City staff, in consultation with the archaeologists, to be to avoid or minimize significant effects to the cultural resources. In addition, pursuant to Section 5097.98 or the State Public Resources Code, and Section 7050.5 of the State Health and Safety Code, in the event of the discovery of human remains, the County Coroner shall be immediately notified. If the remains are determined to be Native American, guidelines of the Native American Heritage Commission shall be adhered to in the treatment and disposition of the remains.
UPDATED TEXT:
Post-Review Discovery Procedures. If subsurface deposits believed to be cultural or human in origin, or tribal cultural resources, are discovered during construction, all work shall halt within a 100-foot radius of the discovery, and the Construction Manager shall immediately notify the City of Roseville Development Services Director by phone. The Construction Manager shall also immediately coordinate with the monitoring archeologist or project archaeologist and tribal monitor(if present), or, in the absence of either, contact consulting tribes and a qualified professional archaeologist, meeting the Secretary of the Interior’s Professional Qualification Standards for archaeology and subject to approval by the City, to evaluate the significance of the find and develop appropriate management recommendations, in coordination with the consulting tribe(s) if the find is a tribal cultural resource.
All management recommendations shall be provided to the City in writing for the City’s review and approval. If recommended by the qualified professional archeologist, and consulting tribe(s), and approved by the City, this may include modification of the no-work radius.
shall review plans for
inclusion and permits of
specifications prior to
the issuance of building
permits
approval of
improveme
nt plans.
Code
Enforceme
nt
Inspector
APPLICABLE MITIGATION MEASURES
from the Sierra Vista Specific Plan EIR
Mitigation Measure Implementation Timing
Reviewing
Party
Documents to
be Submitted
to the City
Staff Use
Only
The professional archaeologist must make a determination, based on professional judgement and supported by substantial evidence, within one business day of being notified, as to whether or not the find represents a cultural or tribal cultural resource or has the potential to be a cultural or tribal cultural resource. The consulting tribe shall also be given the opportunity to provide, within one business day of being notified, a determination as to whether or not the find represents a tribal cultural resource or has the potential to be a tribal cultural resource. The subsequent actions will be determined by the type of discovery, as described below. These include: 1) a work pause that, upon further investigation, is not actually a discovery and the work pause was simply needed in order to allow for closer examination of soil (a “false alarm”); 2) a work pause and subsequent action for discoveries that are clearly not related to tribal resources, such as can and bottle dumps, artifacts of European origin, and remnants of built environment features; and 3) a work pause and subsequent action for discoveries that are likely related to tribal resources, such as midden soil, bedrock mortars, groundstone, or other similar expressions.
Whenever there is question as to whether or not the discovery represents a tribal resource, culturally affiliated tribes shall be consulted in making the determination. Whenever a tribal monitor is present, the monitor shall be consulted.
The following processes shall apply, depending on the nature of the find, subject to the review and approval of the City:
• Response to False Alarms: If the professional archaeologist determine that the find is negative for any cultural indicators and tribal representatives have not indicated the find is a tribal cultural resource, then work may resume immediately upon notice to proceed from the City’s representative.. No further notifications or archaeological consultation is necessary if it is determined that the discovery is not a cultural or tribal cultural resource of any kind. The professional archaeologist shall provide written documentation of this finding to the City, which shall include as an attachment any written documentation provided by tribal representatives or monitors.
APPLICABLE MITIGATION MEASURES
from the Sierra Vista Specific Plan EIR
Mitigation Measure Implementation Timing
Reviewing
Party
Documents to
be Submitted
to the City
Staff Use
Only
• Response to Non-Tribal Discoveries: If a tribal monitor is not present at the time of discovery and a professional archaeologist determines that the find represents a non-tribal cultural resource from any time period or cultural affiliation, the City shall be notified immediately, to consult on a finding of eligibility and implementation of appropriate treatment measures, if the find is determined to be a Historical Resource under CEQA, as defined in Section 15064.5(a) of the CEQA Guidelines. The professional archaeologist shall provide a photograph of the find and a written description to the City of Roseville. The City of Roseville will notify any [tribe(s)] who, in writing, requested notice of unanticipated discovery of non-tribal resources. Notice shall include the photograph and description of the find, and a tribal representative shall have the opportunity to determine whether or not the find represents a tribal cultural resource. If a response is not received within 24 hours of notification (none of which time period may fall on weekends or City holidays), the City will deem this portion of the measure completed in good faith as long as the notification was made and documented. If requested by a [tribe(s)], the City may extend this timeframe, which shall be documented in writing (electronic communication may be used to satisfy this measure). If a notified tribe responds within 24 hours to indicate that the find represents a tribal cultural resource, then the Response to Tribal Discoveries portion of this measure applies. If the tribe does not respond or concurs that the discovery is non-tribal, work shall not resume within the no-work radius until the City, through consultation as appropriate, determines that the site either: 1) is not a Historical Resource under CEQA, as defined in Section 15064.5(a) of the CEQA Guidelines; or 2) that the treatment measures have been completed to its satisfaction.
• Response to Tribal Discoveries: If the find represents a tribal or potentially tribal cultural resource that does not include human remains, the consulting tribe(s) and City shall be notified. The City will consult with the tribe(s) on a finding of eligibility and implement appropriate treatment
APPLICABLE MITIGATION MEASURES
from the Sierra Vista Specific Plan EIR
Mitigation Measure Implementation Timing
Reviewing
Party
Documents to
be Submitted
to the City
Staff Use
Only
measures, if the find is determined to be either a Historical Resource under CEQA, as defined in Section 15064.5(a) of the CEQA Guidelines, or a Tribal Cultural Resource, as defined in Section 21074 of the Public Resources Code. Preservation in place is the preferred treatment, if feasible. Work shall not resume within the no-work radius until the City, through consultation as appropriate, determines that the site either: 1) is not a Historical Resource under CEQA, as defined in Section 15064.5(a) of the CEQA Guidelines; or 2) not a Tribal Cultural Resource, as defined in Section 21074 of the Public Resources Code; or 3) that the treatment measures have been completed to its satisfaction.
• Response to Human Remains: If the find includes human remains, or remains that are potentially human, the construction supervisor or onsite archaeologist and (if present) tribal monitor shall ensure reasonable protection measures are taken to protect the discovery from disturbance (AB 2641) and shall notify the City and Placer County Coroner (per § 7050.5 of the Health and Safety Code). The provisions of § 7050.5 of the California Health and Safety Code, § 5097.98 of the California Public Resources Code, and Assembly Bill 2641 shall be implemented. If the Coroner determines the remains are Native American and not the result of a crime scene, the Coroner will notify the Native American Heritage Commission (NAHC), which then will designate a Native American Most Likely Descendant (MLD) for the project (§ 5097.98 of the Public Resources Code). The designated MLD will have 48 hours from the time access to the property is granted to make recommendations concerning treatment of the remains. Public Resources Code § 5097.94 provides structure for mediation through the NAHC if necessary. If the landowner does not agree with the recommendations of the MLD, the NAHC can mediate (§ 5097.94 of the Public Resources Code).
If no agreement is reached, the landowner must rebury the remains in a respectful manner where they will not be further disturbed (§ 5097.98 of the Public Resources Code). This will also include either recording the site with the NAHC or the appropriate Information Center; using an open
APPLICABLE MITIGATION MEASURES
from the Sierra Vista Specific Plan EIR
Mitigation Measure Implementation Timing
Reviewing
Party
Documents to
be Submitted
to the City
Staff Use
Only
space or conservation zoning designation or easement; or recording a reinternment document with the county in which the property is located (AB 2641). Work shall not resume within the no-work radius until the City, through consultation as appropriate, determines that the treatment measures have been completed to its satisfaction.
SVSP EIR MM 4.9-3. Cease Work Until Review conducted by Qualified Paleontologist and Recommendations Implemented
Should any evidence of paleontological resources (e.g. fossils) be encountered during grading or excavation, work shall be suspended within 100 feet of the find, and the City of Roseville shall be immediately notified. At that time, the City shall coordinate any necessary investigation of the site with a qualified paleontologist to assess the resource and provide proper management recommendations. Possible management recommendations for important resources could include resource avoidance, if feasible in light of project design or layout, or data recovery excavations. The contractor shall implement any measures deemed feasible and necessary by City staff in consultation with the paleontologist for the protection of the paleontological resources.
This condition shall be
reflected in all
construction and
building plans and
permits. The Public
Works Director shall
review plans for
inclusion of
specifications prior to
the issuance of building
permits.
During
constructio
n, as a
condition of
Grading
and
Building
Permits.
Public
Works
Director,
Building
Official,
Code
Enforceme
nt
Inspector
Measure to be
reflected on all
construction
plans
SVSP EIR MM 4.10-1. Identify and Remediate Soil Contamination Prior to site development in the SVSP, recommended testing and remediation, if needed shall occur. Groundwater wells shall be properly closed. If evidence of soil contamination, septic tanks, or other underground storage tanks are encountered in previously unidentified locations in the SVSP area, work shall cease until the area can be tested, and if necessary remediated and/or properly removed or closed. Remediation activities could include removal of contaminated soil, and/or onsite treatment. As part of the process, the City shall ensure that any necessary investigation and/or remediation activities are coordinated with the Roseville Fire Department, Placer County Division of Environmental Health, and if needed, other appropriate federal, state and local agencies. Once a site is remediated, construction can continue.
The Applicant shall be
responsible for
conducting soil testing
and/or recommendation
of the Phase I
environmental site
assessments.
Prior to
issuance of
building
permits.
Fire
Departmen
t
Documentation
indicating soil
has been
remediated
SVSP EIR MM 4.11-5. Treatment Plant Capacity
Prior to obtaining building permits for development that would cause total wastewater flows from SVSP to contribute to total flows at the PGWWTP The applicant shall
demonstrate that the
PGWWTP shall be
expanded.
Prior to
issuance of
building
permit that
Environme
ntal Utilities
Director
Documentation
of the measure
to be provided
APPLICABLE MITIGATION MEASURES
from the Sierra Vista Specific Plan EIR
Mitigation Measure Implementation Timing
Reviewing
Party
Documents to
be Submitted
to the City
Staff Use
Only
exceeding 75 percent utilization of treatment plant capacity (General Plan Policy 3), the City shall confirm that the PGWWTP has adequate capacity and/or will be expanded to accommodate total flow from the SVSP by the time needed to serve that development. This includes obtaining all necessary permits to discharge the treated flow. The City shall also demonstrate that the timing of the plant expansion will be adequate to serve the SVSP area without impeding other planned development within the 2005 SAB. The City shall ensure that all relevant mitigation measures identified in the Wastewater Master Plan EIR are implemented. A list of mitigation measures applicable to this project area are found in Appendix H of this EIR.
would
cause total
wastewater
flows to
exceed 75
percent
utilization
of
treatment
plant
capacity.
SVSP EIR MM 4.13-1. Implementation of Construction Activity Stormwater Protection Standards
Prior to the issuance of a City grading permit and the commencement of construction activities, compliance with the State’s General Construction permit, the City of Roseville’s Construction Standards, and the City’s Stormwater BMP Guidance Manual will be met. This includes the creation of a Storm Water Pollution Prevention Plan (SWPPP) that will identify the site, the location of sensitive habitats or watercourses, drainage areas, discharge locations, soil disturbance areas, and the locations of all runoff, erosion control, and sediment control Best Management Practices (BMPs). On-going monitoring and adjustments to the SWPPP will occur when needed to address changes in the field as construction activities evolve.
This condition shall be
reflected in all
construction and
building plans. The
Public Works Director
shall review plans for
inclusion of
specifications prior to
the issuance of building
permits.
Prior to
issuance of
grading or
building
permits.
Public
Works
Director,
Building
Official,
Code
Enforceme
nt
Inspector
Measure to be
reflected on all
construction
plans
SVSP EIR MM 4.14-3. Avoid Light Spillover in Open Space Areas Areas Outdoor lighting shall be placed, designed and directed so as to avoid light spillover into the habitat of Curry Creek and the Open Space Preserve areas located immediately adjacent to the open space, as shown on the Land Use Map as parcels KT-1, KT-40, KT-30, KT-41, DF-1, DF-2, DF-40, CG-1, CG82m JM-21, JM-3, and JM-4.
The City shall
implement policies to
reduce the nuisance
effects of
nighttime/daytime
and/or high-intensity
illumination from the
project.
Prior to
issuance of
Building
Permits;
the
disclosures
shall occur
prior to the
issuance of
Occupancy
Permits
Parks and
Recreation
Director
Plans will be
reviewed to
ensure
compliance
APPLICABLE MITIGATION MEASURES
from the Sierra Vista Specific Plan EIR
Mitigation Measure Implementation Timing
Reviewing
Party
Documents to
be Submitted
to the City
Staff Use
Only
SVSP EIR WMM 4.1-2. Policies to Minimize Agricultural Impacts Condition of Approval for Deed Disclosure and WMM 4.1-2 Policies to Minimize Agricultural impacts; WMM 4.5-2 Construction Noise Policies, and WMM 4.4-3 Reduction of Construction Emissions
In order to reduce potential conflicts between sensitive uses and agricultural uses, residential units within 100-feet of undeveloped parcels to the west of the SVSP are where agricultural uses exist shall be provided with a deed disclosure or similar notice approved by the City attorney regarding the proximity and nature of neighboring potential agricultural uses. This disclosure shall be applied at the tentative map stage to the affected properties. A written disclosure shall be supplied to the property purchaser or renter by the vendor prior to the completion of the purchase or rental agreement, until such time, the uses are converted to urban development. The text of the disclosure language shall be approved by the City Attorney.
To ensure that residents are made aware of other land uses in proximity to their respective neighborhoods, the developers shall also provide through deed disclosure or other similar notice approved by the City Attorney; proximity to the WAPA corridor and overhead power lines, high pressure gas lines in Baseline Road and Fiddyment Road, use of recycled water, and proximity to parks and schools that may generate noise and light.
The Applicant shall
include site-specific
design measures, such
as setbacks, landscape
buffers, building
orientation, and
appropriate design
features, through the
specific plan.
Prior to
occupancy
of any
residence
or sensitive
use.
City
Attorney,
Public
Works
Departmen
t, Code
Enforceme
nt
Included in the
SVSP
SVSP EIR WMM 4.5-2. Construction Noise Policies
Condition of Approval for Deed Disclosure and WMM 4.1-2 Policies to Minimize Agricultural impacts; WMM 4.5-2 Construction Noise Policies, and WMM 4.4-3 Reduction of Construction Emissions
In order to reduce potential conflicts between sensitive uses and agricultural uses, residential units within 100-feet of undeveloped parcels to the west of the SVSP are where agricultural uses exist shall be provided with a deed disclosure or similar notice approved by the City attorney regarding the proximity and nature of neighboring potential agricultural uses. This disclosure shall be applied at the tentative map stage to the affected properties. A written disclosure shall be supplied to the property purchaser or renter by the vendor prior to the completion of the purchase or rental agreement, until such time, the uses are converted to urban development. The text of the disclosure language shall be approved by the City Attorney.
The Applicant shall
include site-specific
design measures, such
as setbacks, landscape
buffers, building
orientation, and
appropriate design
features, through the
specific plan.
Prior to
occupancy
of any
residence
or sensitive
use.
City
Attorney,
Public
Works
Departmen
t, Code
Enforceme
nt
CC&R’s shall
be submitted
for review
APPLICABLE MITIGATION MEASURES
from the Sierra Vista Specific Plan EIR
Mitigation Measure Implementation Timing
Reviewing
Party
Documents to
be Submitted
to the City
Staff Use
Only
To ensure that residents are made aware of other land uses in proximity to their respective neighborhoods, the developers shall also provide through deed disclosure or other similar notice approved by the City Attorney; proximity to the WAPA corridor and overhead power lines, high pressure gas lines in Baseline Road and Fiddyment Road, use of recycled water, and proximity to parks and schools that may generate noise and light.
SVSP EIR WMM 4.5-8. Onsite Traffic Noise Attenuation
The project developer shall demonstrate through an acoustical study that residences along roadways will be subject to noise levels consistent with the City’s standards. The standards could be achieved through a combination of setbacks, soundwalls or other barriers, building orientation or other measures.
An acoustical analysis shall be required to demonstrate that these measures will result in acceptable noise levels.
Done Done Done See
Attachment 4
of Addendum
SVSP EIR WMM 4.11.3-2. School Transportation Policies
The applicants shall work with the school districts to identify safe routes to school. The school district should encourage an appropriate mechanism for transporting students to schools, both within the specific plan area, as well as outside the project area. Bus programs would reduce traffic congestion and reduce potential air quality impacts.
Prior to building permits
being issued within the
SVSP, school
transportation policies
should be developed in
coordination with
appropriate school
district.
Prior to
issuance of
Building
Permits.
Planning
Director,
Public
Works
Director
Done
SVSP EIR WMM 4.11-7. Expand the WRSL Landfill (occurred) WMM 4.11-7 Expand the WRSL Landfill
Development in the SVSP Area and Urban Reserve shall pay collection fess to the City of Roseville, a portion of which shall be used to service bonds necessary to fund landfill expansion. As a member of the WPWMA, the City of Roseville can support the expansion of the landfill, as needed; however, the City cannot compel the WPWMA to expand the landfill.
The City shall support
the WPWMA efforts to
expand the Western
Regional Sanitary
Landfill.
At the time
of
constructio
n debris
will be
diverted to
an
appropriate
recycling
facility.
Environme
ntal Utilities
Director
Done
SVSP EIR WMM 4.11-11. Divert Construction Debris
The applicants shall ensure a 50% reduction in the development’s The applicant shall
submit evidence of their
waste diversion plan to
Prior to
Building
Permit
issuance.
Building
Division
Records of
diversion
APPLICABLE MITIGATION MEASURES
from the Sierra Vista Specific Plan EIR
Mitigation Measure Implementation Timing
Reviewing
Party
Documents to
be Submitted
to the City
Staff Use
Only
construction waste stream. In Developer contracts with construction contractors and their sub-contractors, the Developer shall require that construction waste be reduced by 50%. The Developer shall further require that contractors and sub-contractors submit records of diversion and disposal to the City’s Environmental Utilities Department in order to verify compliance with this requirement.
the City’s Building
Division.
SVSP EIR WMM 4.12-1. Prepare Site Specific Drainage Study If a larger detention basin near the main branch of Curry Creek is used for the Remainder Area, and includes flows for the WRSP Area, Specific Plans and/or other development proposals for the Remainder Area Urban Reserve shall prepare a site specific drainage study. The study shall identify appropriate sizing and to ensure that Remainder Area Urban Reserve flows, in combination with flows generated in the WRSP Area, can be accommodated in the larger basin The study shall also be used to identify features that will limit peak flow runoff from the areas drained to Curry Creek to pre-development levels per the PCFCWCD SWMM and City standards. The study shall also be used to demonstrate the larger basin will not cause or exacerbate downstream flooding conditions in the SOI Amendment Area or at downstream locations outside the SOI Amendment area. The drainage study shall be submitted to the PCFCWCD and the City of Roseville for review. If a basin in the Remainder Area is used to store flows generated by sheds C-WP7 and C-WP8 in the WRSP Area, in addition to Remainder Area generated flows, the drainage study shall ensure that sufficient capacity is provided to manage total flows into the basin.
Done Done Done See
Attachment 3
of Addendum
SVSP EIR WMM 4.12-2. Pay fair share of Roseville Regional Stormwater Retention Facility improvements
The City shall collect the Pleasant Grove Drainage fee from the applicants prior to the approval of each building permit, which would cover the cost of retention for that development’s portion of the Roseville regional retention basin at Reason Farms.
The City shall collect
the Pleasant Grove
Drainage fee from
applicants.
Prior to the
issuance of
Building
Permits.
Public
Works
Director
Fees will be
collected