Cities Index.
Staff Report - Cooperative Purchase Contract - Replacement Fire Apparatus [Published for 10-day Review 06-09-2022]

Sacramento City Council
June 21, 2022

Document
Staff Report - Cooperative Purchase Contract - Replacement Fire Apparatus [Published for 10-day Review 06-09-2022]
Meeting
June 21, 2022
Body
Sacramento City Council
Pages
45
Original file
11.6 MB
Text extracted from the city's file for reading and search. Open the original on sacramento.granicus.com. That file is the official record.

FS19ZB05 M2 Freightliner, 4x4, 2-Door OEM Cab, MAVERICK Pump er, Aluminum Body, Single Axle, 1000 GPM Pump, 1500 Gallon Tank
FS19ZB06 IH HV507, 4x4, 2-Door OEM Cab, MAVERICK Pumper, Alu minum Body, Single Axle, 1000 GPM Pump, 1500 Gallon Tank
FS19ZB07 Ford F550, 4x4, 2-Door OEM Cab, , Wildland Aluminum Huck Bolt Body, 200 GPM Pump, 300 Gallon Tank
FS19ZC01 M2 Freightliner, 2-Door OEM Cab, Pumper, Formed Aluminum Body, Single Axle 1250 GPM Pump, Side Mounted
FS19ZC02 IH MV607, 2-Door OEM Cab, Pumper, Formed Aluminum Body, Single Axle, 1250GPM Pump, Side Mounted
FS19ZC03 Kenworth, 2-Door OEM Cab, Pumper, Formed Aluminum Body, Single Axle, 1250 GPM Pump, Side Mounted
FS19ZC04 M2 Freightliner, 2-Door OEM Cab, Firestar Pumper, F ormed Aluminum Body, Single Axle 1250 GPM Pump, Side Mounted
FS19ZC05 Rosenbauer Commander, 4-Door Full-Tilt Aluminum Cab, Formed Aluminum Body, Single Axle, 1250 GPM Pump, Side Mounted
FS19ZC06 Rosenbauer Commander, 4-Door Full-Tilt Aluminum Cab, Formed Aluminum Body, Single Axle, 1250 GPM Pump, Rear Mounted
FS19ZC07 Rosenbauer Commander, 4-Door Full-Tilt Aluminum Cab, Formed Aluminum Body, Single Axle, 1500 GPM Pump, Side Mounted
FS19ZC08 Rosenbauer Commander, 4-Door Full-Tilt Aluminum Cab, Formed Aluminum Body, Single Axle, 1500 GPM Pump, Rear Mounted
FS19ZC09 Rosenbauer Warrior, 4-Door Full-Tilt, Aluminum Cab, Formed Aluminum Body, Single Axle, 1250 GPM Pump, Side Mounted
FS19ZC10 Ford F550, 4x2, 2-Door OEM Cab, Mini Pumper, Formed Aluminum Body, 500 GPM PTO Pump, Side Mounted
FS19ZD01 M2 Freightliner, 2-Door, OEM Cab, Single Axle, Formed Aluminum Body, Non-Walk-In Body FS19ZD02 IH MV607, 2-Door, OEM Cab, Single Axle, Formed Aluminum Body, Non-Walk-In Body FS19ZD03 Rosenbauer Commander, 4-Door, Full-Tilt, Aluminum Cab, Single Axle, Formed Aluminum Body, Non-Walk-In Body
FS19ZD04 Rosenbauer Commander, 4-Door, Full-Tilt, Aluminum Cab, Tandem Axle, Formed Aluminum Body, Non-Walk-In Body
FS19ZD05 M2 Freightliner, 2-Door, OEM Cab, Single Axle, Formed Aluminum Body, Walk-In Body FS19ZD06 IH MV607, 2-Door, OEM Cab, Single Axle, Formed Aluminum Body, Walk-In Body FS19ZD07 Rosenbauer Commander, 4-Door, Full-Tilt, Aluminum Cab, Single Axle, Formed Aluminum Body, Walk-In Body
FS19ZD08 Rosenbauer Commander, 4-Door, Full-Tilt, Aluminum Cab, Tandem Axle, Formed Aluminum Body, Walk-In Body
FS19ZD09 Ford F-550, 2-Door, OEM Cab, Single Axle, Formed Aluminum Body, Non-Walk-In Body FS19ZE01 M2 Freightliner, 2-Door, OEM Cab, Pumper/Tanker, Fo rmed Aluminum Body, 1800 Gallon Tank, Single Axle, 1250 GPM Pump, Mid-Mounted
FS19ZE02 M2 Freightliner, 2-Door, OEM Cab, Pumper/Tanker, Fo rmed Aluminum Body, 2000 Gallon Tank, Tandem Axle, 1250 GPM Pump, Mid-Mounted
FS19ZE03 IH MV607, 2-Door, OEM Cab, Pumper/Tanker, Formed Aluminum Body, 1800 Gallon Tank, Single Axle, 1250 GPM Pump, Mid-Mounted
FS19ZE04 IH7400, 2-Door, OEM Cab, Pumper/Tanker, Formed Aluminum Body, 2000 Gallon Tank, Tandem Axle, 1250 GPM Pump, Mid-Mounted
FS19ZE05 Kenworth T300, 2-Door, OEM Cab, Pumper/Tanker, Formed Aluminum Body, 1800 Gallon Tank, Single Axle, 1250 GPM Pump, Mid-Mounted
FS19ZE06 Kenworth T300, 2-Door, OEM Cab, Pumper/Tanker, Formed Aluminum Body, 2000 Gallon Tank, Tandem Axle, 1250 GPM Pump, Mid-Mounted
E. Pumper/Tankers & Tankers
C. Pumper Fire Apparatus
D. Special Service Apparatus (Walk-In & Non-Walk-in Bodies) Multi-use: Rescue, Re-Hab, Hazmat, Mobile Command Center

Page 31 of 47 ends

FS19ZE07 Rosenbauer Commander, 4-Door Full-Tilt, Aluminum Cab, Pumper/Tanker, Formed Aluminum Body, 1800Gallon Tank, Single Axle, 1250 GPM Pump, Mid-Mounted FS19ZE08 Rosenbauer Commander, 4-Door Full-Tilt, Aluminum Cab, Pumper/Tanker, Formed Aluminum Body, 2000 Gallon Tank, Tandem Axle, 1250 GPM Pump, Mid-Mounted FS19ZE09 M2 Freightliner, 2-Door, OEM Cab, Wet Side Tanker, Formed Aluminum Body, 3000 Gallon Tank, Tandem Axle, 1250 GPM Pump, Mid-Mounted
FS19AAA01 Seagrave Marauder II Custom 4-Door Full Tilt Stainless Steel Cab and Body, Single Axle, 75' Rear Mount Ladder (Meanstick) Telescoping Ladder (500#)
FS19AAA02 Seagrave Marauder II Custom 4-door Full Tilt Stainless Steel Cab and Body, Tandem Axle, 100' Rear Mount Ladder Telescoping (500#)
FS19AAA03 Seagrave Marauder II Custom 4-door Full Tilt Stainless Steel Tractor and Body, Single Axle, 100' Tractor Drawn Aerial - Mid Mounted Telescoping Ladder (250#) FS19AAA04 Seagrave Marauder II Custom 4-door Full Tilt Stainless Steel Tractor and Body, Single Axle, 100' Tractor Drawn Aerial - Mid Mounted Telescoping Ladder (500#) FS19AAA05 Seagrave Marauder II Custom 4-door Full Tilt Stainless Steel Cab and Body, Tandem Axle, 105' Rear Mount Telescoping Ladder Platform (1200#)
FS19AAA06 Seagrave Marauder II Custom 4-door Full Tilt Stainless Steel Cab and Body, Tandem Axle, 75' Mid Mounted Telescoping Platform (1000#) - Aerialscope
FS19AAA07 Seagrave Marauder II Custom 4-Door Full Tilt Stainless Steel Cab and Body, Tandem Axle, 95' Mid Mount Telescoping Platform (1000#) - Aerialscope
FS19AAA08 Seagrave Marauder II Custom 4-Door Full Tilt Stainless Steel Cab and Body, Single Axle, 60' Articulating Water Tower.

FS19AAB01 Ford F550, 2-Door, OEM Cab, 4x4, Brush Truck, Alum inum Bed with Aluminum Compartments FS19AAB02 Freightliner, 4-Door, OEM Cab, 4 x 4, Wildland Pump er, Polyprene Body, 1250 GPM Pump, Side Mount
FS19AAB03 Freightliner, 4-Door, OEM Cab, 4 x 4, Wildland Pump er, Stainless Steel Body, 1250 GPM Pump, Side Mount
FS19AAC01 Seagrave Marauder II, Custom 4-Door Full Tilt Stainless Steel Cab and Body, Single Rear Axle, 1500 GPM Pump, Mid Mounted Pump
FS19AAC02 Freightliner, 4-Door, OEM Cab, Aluminum Body, Single Axle, 1250 GPM Pump, Mid Mounted Pump
FS19AAC03 Freightliner, 2-Door, OEM Cab, Polyprene Body, Single Axle, 1250 GPM Pump, Mid Mounted Pump
FS19AAD01 Seagrave Maruader II Custom 4-Door Full Tilt Stainless Steel Cab and Body, Single Axle, Non-Walk- In Body
FS19AAD02 Freightliner, 2-Door, OEM Cab, Single Axle, Polyprene Rescue, Non-Walk-In Body FS19AAD03 Seagrave Maruader II Custom 4-Door Full Tilt Stainless Steel Cab and Body, Single Axle,Walk-In Body
FS19AAE01 Seagrave Marauder II Custom 4-Door Full Tilt Stainless Steel Cab and Body, Tandem Axle, 1500 GPM Pump, Mid Mounted Pump, 2000 Gallon Tank
FS19AAE02 Freightliner, 2-Door, OEM Cab, Polyprene Body, Single Axle, PTO Pump, Side Mount, 2000 Gallon Tank
FS19AAE03 Freightliner, 2-Door, OEM Cab, Polyprene Body, Tandem Axle, PTO Pump, Side Mount, 3000 Gallon Tank
FS19AAE04 Freightliner, 2-Door, OEM Cab, Polyprene Body, Tandem Axle, Gas Pump, 3000 Gallon Tank AA. Seagrave
C. Pumper Fire Apparatus
E. Pumper/Tankers & Tankers
B. Wildland Fire Apparatus (Brush Fire)
A. Aerials (Booms/Platforms, Ladders, Ladder/Platfo rms) B. Wildland Fire Apparatus (Brush Fire)
BB. Skeeter
D. Special Service Apparatus (Walk-In & Non-Walk-in Bodies) Multi-use: Rescue, Re-Hab, Hazmat, Mobile Command Center

Page 32 of 47 ends

FS19BBB01 Slip In Unit: Complete Slip in firefighting package for flatbed or pickup bed. Heavy Duty frame, 200 GPM pump, 300 gallon poly tank. 150’ hose reel. Hos e Tray. Stainless steel plumbing.

FS19BBB02
Skeeter Type 3 or 4 F-650: Brush unit, Large (33,000 gvw). Custom firefighting body. 750 gallon poly tank. 200-750 gpm pump. 150’ hose reel. Stainless steel plumbing. Hose tray.

Tool tray. Side body compartments.

FS19BBB03
Skeeter Type 5 F-550: Brush unit, Medium (19,500 gvw). Custom firefighting body. 400 gallon poly tank. 200 gpm pump. 150’ hose reel. Stainless steel plumbing. Hose tray. Tool tray. Side body compartments.

FS19BBB04
Skeeter Type 6 F-350: Brush unit, Small (13,000 gvw). Custom firefighting body. 300 gallon poly tank. 200 gpm pump. 150’ hose reel. Stainless steel plumbing. Hose tray. Tool tray. Side body compartments.

FS19BBB05 Type 5 Ram 5500 (19,000 GVW) Brush Unit Medium – 40 0 gallons/200 GPM pump. Hose Reel.

FS19BBB06 Type 6 Ram 3500 (12,500 GVW) Brush Unit Small – 300 gallons/200 GPM pump.

Hose Reel
FS19BBB07 Type 3 International 7400 (35,000 GVW) Brush Unit Large – 750 gallons/200-750 GPM Pump. Hose reel.

FS19BBB08 Type 3 Freightliner M2 (37,000 GVW) Brush Unit Large – 750 gallons/200-750 GPM Pump. Hose reel.

FS19BBB09 Squad Rescue Ford F-450 - Small Rescue Body with (2) Front Vertical Compartments, (2) Rear Veritical Compartments and (2) Center Compartments FS19BBB10 Squad Rescue Ram - 4500 Small Rescue Body with (2) Front Vertical Compartments, (2) Rear Veritical Compartments and (2) Center Compartments FS19BBB11 Type 5 Chevy 5500 (19,000 GVW) Brush Unit Medium – 400 gallons/200 GPM pump. Hose Reel.

FS19BBB12 Type 6 Chevy 4500 (12,500 GVW) Brush Unit Small – 3 00 gallons/200 GPM pump.

Hose Reel
FS19BBB13 Type 3 Chevy 6500 (22,900 GVW) Brush Unit Large – 7 50 gallons/200-750 GPM Pump. Hose reel.

FS19CCA01 55' Rear Mount Telescoping Ladder, Formed Aluminum Body, Spartan Metro Star, 4-Door, Tilt Cab, Single Axle
FS19CCA02 75' Rear Mount Telescoping Ladder, Formed Aluminum Body, Spartan Metro Star, 4-Door, Tilt Cab, Single Axle
FS19CCA03 75' Rear Mount Telescoping Ladder, Formed Aluminum Body, Spartan Metro Star, 4-Door, Tilt Cab, Tandem Axle
FS19CCA04 100' Mid Mount Telescoping Ladder, Formed Aluminum Body, Spartan Gladiator, 4-Door, Tilt Cab, Tandem Axle
FS19CCA05 105' Rear Mount Telescoping Ladder, Formed Aluminum Body, Spartan Gladiator, 4-Door, Tilt Cab, Tandem Axle
FS19CCA06 110' Rear Mount Telescoping Ladder, Formed Aluminum Body, Spartan Gladiator, 4-Door, Tilt Cab, Tandem Axle
FS19CCA07 125' Rear Mount Telescoping Ladder, Formed Aluminum Body, Spartan Gladiator, 4-Door, Tilt Cab, Tandem Axle
FS19CCA08 85' Mid-Mount Telescoping Ladder with Platform, Formed Aluminum Body, Spartan Gladiator, 4- Door, Tilt Cab, Tandem Axle
FS19CCA09 93' Mid-Mount Telescoping Ladder with Platform, Formed Aluminum Body, Spartan Gladiator, 4- Door, Tilt Cab, Tandem Axle
FS19CCA10 100' Rear-Mount Telescoping Ladder with Platform, Formed Aluminum Body, Spartan Gladiator, 4- Door, Tilt Cab, Tandem Axle
FS19CCA11 100' Mid-Mount Telescoping Ladder with Platform, Formed Aluminum Body, Spartan Gladiator, 4- Door, Tilt Cab, Tandem Axle
FS19CCA12 100' Tractor Drawn Telescoping Ladder (TDA), Formed Aluminum Body, Spartan Gladiator, 4- Door, Tilt Cab, Single Axle
A. Aerials (Booms/Platforms, Ladders, Ladder/Platfo rms) CC. Smeal

Page 33 of 47 ends

FS19CCA13 105' Tractor Drawn Telescoping Ladder (TDA), Formed Aluminum Body, Spartan Gladiator, 4-Door Tilt Cab, Single Axle
FS19CCA14 105' Tractor Drawn Telescoping Ladder Quint (TDA), Formed Aluminum Body, Spartan Gladiator, 4- Door, Tilt Cab, Tandem Axle
FS19CCA15 54' Squrt - Rear Mount Articulating Water Tower , Formed Aluminum Body, Spartan Metro Star, 4- Door, Tilt Cab, Single Axle
FS19CCA16 50' Tele-Squrt - Rear Mount Water Tower w/ Ladder, Formed Aluminum Body, Spartan Metro Star, 4-Door, Tilt Cab, Single Axle
FS19CCA17 65' Tele-Squrt - Rear Mount Water Tower w/ Ladder, Formed Aluminum Body, Spartan Metro Star, 4-Door, Tilt Cab, Single Axle
FS19CCA18 55' Snorkel - Rear Mount Articulating Platform, Formed Aluminum Body, Spartan Metro Star, 4- Door, Tilt Cab, Single Axle
FS19CCB01 Type III Wildland Pumper, 500 GPM, Formed Aluminum Body, International Chassis, 4-Door, 4x4, OEM Cab, Single Axle
FS19CCB02 Type I Wildland Pumper, 1250 GPM, Formed Aluminum Body, Spartan Metro Star, 4-Door, Tilt Cab, Single Axle
FS19CCC01 Pumper, Midship, 1250 GPM, Formed Aluminum Body, Freightliner Chassis, 2-Door, OEM Cab, Single Axle
FS19CCC02 Pumper, Midship, 1250 GPM, Formed Aluminum Body, International Chassis, 2-Door, OEM Cab, Single Axle
FS19CCC03 Pumper, Midship, 1250 GPM, Formed Aluminum Body, Kenworth Chassis, 2-Door, OEM Cab, Single Axle
FS19CCC04 Pumper, Midship, 1250 GPM, Formed Aluminum Body, Freightliner Chassis, 4-Door, OEM Cab, Single Axle
FS19CCC05 Pumper, Midship, 1250 GPM, Formed Aluminum Body, Spartan Metro Star, 4-Door, Tilt Cab, Single Axle
FS19CCC06 Pumper, Midship, 1250 GPM, Formed Aluminum Body, Spartan Metro Star, 4-Door, Tilt Cab, Tandem Axle
FS19CCE01 Pumper/Tanker, Midship, 1250 GPM, 1500 Gallon Tank, Formed Aluminum Body, Freightliner Chassis, 2-Door, Single Axle
FS19CCE02 Pumper/Tanker, Midship, 1250 GPM, 1500 Gallon Tank, Formed Aluminum Body, International Chassis, 2-Door, Single Axle
FS19CCE03 Pumper/Tanker, Midship, 1250 GPM, 1500 Gallon Tank, Formed Aluminum Body, Kenworth Chassis, 2-Door, Single Axle
FS19CCE04 Pumper/Tanker, Midship, 1250 GPM, 3000 Gallon Tank, Formed Aluminum Body, Freightliner Chassis, 2-Door, Tandem Axle
FS19DDB01
Southeast Apparatus Wildland Fire Apparatus, Ford Gas F-550 Regular Cab, 4X4 - 9’ Aluminum Flatbed Body with High-Side Compartments - Skid Unit, 300 GPM Pump, 250 Gallon Polypropylene Tank, Booster Reel.

FS19DDB02 Southeast Apparatus Wildland Fire Apparatus, Ford Gas F-550 Regular Cab, 4X4 - 11’ Aluminum Flatbed Body with Standing Stations, Crosswalk and High-Side Compartments - Skid Unit, 300 GPM Pump, 250 Gallon Polypropylene Tank, Booster Reel.

FS19DDB03
Southeast Apparatus Large Wildland Fire Apparatus - KW T-370 2-Door - Diamond Tread Aluminum Body with Low-Side Compartments, Catwalks, Crosswalk, Handrails, Inward Swinging Gates - 375 GPM Auxiliary Pump, 500 Gallon Polypropylene Tank, 1.0" Booster Reel, 2.5" Rear Discharge, Capable of Drafting 12' Vertical.

FS19DDC01 Southeast Apparatus Extreme Duty 3/16" All Aluminum 14' Pumper Body - KW T-370 2 Door - 750 Gallon Polypropylene Tank - Side-Mount 1,250 GPM Pump.

C. Pumper Fire Apparatus
E. Pumper/Tankers & Tankers
C. Pumper Fire Apparatus
DD. Southeast Apparatus
B. Wildland Fire Apparatus (Brush Fire)
B. Wildland Fire Apparatus (Brush Fire)

Page 34 of 47 ends

FS19DDC02 Southeast Apparatus Extreme Duty 3/16" All Aluminum 14' Pumper Body - Spartan Metro 4-Door Custom - 750 Gallon Polypropylene Tank - Side-Mount 1,250 GPM Pump.

FS19DDC03 Southeast Apparatus Extreme Duty 3/16" All Aluminum Mini-Pumper Body - Ford 550 4-Door, 4X4, Diesel - 300 Gallon Polypropylene Tank - Side-Mount 1,250 GPM Pump.

FS19DDD01 Southeast Apparatus Extreme Duty 3/16" All Aluminum 9' Dry Rescue Body - Ford Gas F-550 Regular Cab, 4X4
FS19DDD02 Southeast Apparatus Extreme Duty 3/16" All Aluminum 9' Wet Rescue Body - Ford Gas F-550 Regular Cab, 4X4 - 300 GPM Pump, 250 Gallon Polyp ropylene Tank, Booster Reel FS19DDD03 Southeast Apparatus Extreme Duty 3/16" All Aluminum 10' Dry Rescue Body - Ford Gas F-550 Regular Cab, 4X4
FS19DDD04 Southeast Apparatus Extreme Duty 3/16" All Aluminum 10' Wet Rescue Body - Ford Gas F-550 Regular Cab, 4X4 - 300 GPM Pump, 250 Gallon Polyp ropylene Tank, Booster Reel FS19DDD05 Southeast Apparatus Extreme Duty 3/16" All Aluminum 11' Dry Rescue Body - Ford Gas F-550 Regular Cab, 4X4
FS19DDD06 Southeast Apparatus Extreme Duty 3/16" All Aluminum 11' Wet Rescue Body - Ford Gas F-550 Regular Cab, 4X4 - 300 GPM Pump, 250 Gallon Polyp ropylene Tank, Booster Reel FS19DDD07 Southeast Apparatus Extreme Duty 3/16" All Aluminum 12' Dry Rescue Body - Ford Gas F-550 Regular Cab, 4X4
FS19DDD08 Southeast Apparatus Extreme Duty 3/16" All Aluminum 12' Wet Rescue Body - Ford Gas F-550 Regular Cab, 4X4 - 300 GPM Pump, 250 Gallon Polyp ropylene Tank, Booster Reel FS19DDD09 Southeast Apparatus Extreme Duty 3/16" All Aluminum Heavy Rescue Body - KW T-370 2-Door FS19DDD10 Southeast Apparatus Extreme Duty 3/16" All Aluminum Heavy Rescue Body - Spartan 4-Door Custom Cab
FS19DDE01 Southeast Apparatus Extreme Duty 3/16" All Aluminum 12' Tanker Body - KW T-370 2 Door - 2,000 Gallon Polypropylene Rectangular Tank - 500 GPM Pump, Dump Valve, Tank Fill Valve FS19DDE02 Southeast Apparatus Extreme Duty 3/16" All Aluminum 12' Tanker Body - KW T-370 2 Door - 2,000 Gallon Polypropylene "T" Tank - 500 GPM Pump, Dump Valve, Tank Fill Valve FS19DDE03 Southeast Apparatus Extreme Duty 3/16" All Aluminum 16' Tanker Body - KW T-370 2 Door - 3,000 Gallon Polypropylene "T" Tank - 500 GPM Pump, Dump Valve, Tank Fill Valve FS19DDE04 Southeast Apparatus Extreme Duty 3/16" All Aluminum 18' Tanker Body - KW T-370 2 Door - 3,000 Gallon Polypropylene Rectangular Tank - 500 GPM Pump, Dump Valve, Tank Fill Valve FS19DDE05
Southeast Apparatus Extreme Duty 3/16" All Aluminum 12' Tanker Body - Spartan 4-Door Custom Cab - 2,000 Gallon Polypropylene Rectangular Tank - 500 GPM Pump, Dump Valve, Tank Fill Valve
FS19DDE06
Southeast Apparatus Extreme Duty 3/16" All Aluminum 18' Tanker Body - Spartan 4-Door Custom Cab - 3,000 Gallon Polypropylene Rectangular Tank - 500 GPM Pump, Dump Valve, Tank Fill Valve
FS19EEA01 55' Rear Mount Telescoping Ladder, Formed Aluminum Body, Spartan Metro Star, 4-Door, Tilt Cab, Single Axle
FS19EEA02
75' Rear Mount Telescoping Ladder, Formed Aluminum Body, Spartan Metro Star, 4-Door, Tilt Cab, Single Axle
FS19EEA03 75' Rear Mount Telescoping Ladder, Formed Aluminum Body, Spartan Metro Star, 4-Door, Tilt Cab, Tandem Axle
D. Special Service Apparatus (Walk-In & Non-Walk-in Bodies) Multi-use: Rescue, Re-Hab, Hazmat, Mobile E. Pumper/Tankers & Tankers
A. Aerials (Booms/Platforms, Ladders, Ladder/Platfo rms) EE. Spartan ERV

Page 35 of 47 ends

FS19EEA04 100' Mid Mount Telescoping Ladder, Formed Aluminum Body, Spartan Gladiator, 4-Door, Tilt Cab, Tandem Axle
FS19EEA05 105' Rear Mount Telescoping Ladder, Formed Aluminum Body, Spartan Gladiator, 4-Door, Tilt Cab, Tandem Axle
FS19EEA06
110' Rear Mount Telescoping Ladder, Formed Aluminum Body, Spartan Gladiator, 4-Door, Tilt Cab, Tandem Axle
FS19EEA07 125' Rear Mount Telescoping Ladder, Formed Aluminum Body, Spartan Gladiator, 4-Door, Tilt Cab, Tandem Axle
FS19EEA08 85' Mid-Mount Telescoping Ladder with Platform, Formed Aluminum Body, Spartan Gladiator, 4- Door, Tilt Cab, Tandem Axle
FS19EEA09 93' Mid-Mount Telescoping Ladder with Platform, Formed Aluminum Body, Spartan Gladiator, 4- Door, Tilt Cab, Tandem Axle
FS19EEA10 100' Rear-Mount Telescoping Ladder with Platform, Formed Aluminum Body, Spartan Gladiator, 4- Door, Tilt Cab, Tandem Axle
FS19EEA11 100' Mid-Mount Telescoping Ladder with Platform, Formed Aluminum Body, Spartan Gladiator, 4- Door, Tilt Cab, Tandem Axle
FS19EEA12 100' Tractor Drawn Telescoping Ladder (TDA), Formed Aluminum Body, Spartan Gladiator, 4- Door, Tilt Cab, Single Axle
FS19EEA13 105' Tractor Drawn Telescoping Ladder (TDA), Formed Aluminum Body, Spartan Gladiator, 4-Door Tilt Cab, Single Axle
FS19EEA14 105' Tractor Drawn Telescoping Ladder Quint (TDA), Formed Aluminum Body, Spartan Gladiator, 4- Door, Tilt Cab, Tandem Axle
FS19EEA15 54' Squrt - Rear Mount Articulating Water Tower , Formed Aluminum Body, Spartan Metro Star, 4- Door, Tilt Cab, Single Axle
FS19EEA16 50' Tele-Squrt - Rear Mount Water Tower w/ Ladder, Formed Aluminum Body, Spartan Metro Star, 4-Door, Tilt Cab, Single Axle
FS19EEA17
65' Tele-Squrt - Rear Mount Water Tower w/ Ladder, Formed Aluminum Body, Spartan Metro Star, 4-Door, Tilt Cab, Single Axle
FS19EEA18 55' Snorkel - Rear Mount Articulating Platform, Formed Aluminum Body, Spartan Metro Star, 4- Door, Tilt Cab, Single Axle
FS19EEB01 Ford F550, 4x2, Aluminum Flat Bed Body
FS19EEB02 International 2-Door, 4x2, Aluminum Flat Bed Body FS19EEB03 International 2-Door 4x2, Wildland Interface, Aluminum body FS19EEB04 Type III Wildland Pumper, 500 GPM, Aluminum Body, International Chassis, 4-Door, 4X4, OEM Cab, Single Axle
FS19EEC01 Ford F-550 2-Door, Pumper, 4x2, Aluminum Body, Sing le Axle, 1250 GPM Pump, Mid-Mounted FS19EEC02 Pumper, Midship, 1250 GPM, Aluminum Body, Freightliner Chassis, 2-Door, 4X2, OEM Cab, Single Axle
FS19EEC03 Pumper, Midship, 1250 GPM, Aluminum Body, Kenworth Chassis, 2-Door, 4X2, OEM Cab, Single Axle
FS19EEC04 Pumper, Midship, 1250 GPM, Aluminum Body, International Chassis, 2-Door, 4X2, OEM Cab, Single Axle
FS19EEC05 Freightliner 2-Door, Pumper, 4x2, Aluminum Body, Tandem Axle, 1250 GPM Pump, Mid-Mounted FS19EEC06 Pumper, Midship, 1250 GPM, Formed Aluminum Body, Spartan Metro Star, 4-Door, Tilt Cab, Single Axle
FS19EEC07 Spartan 4-Door Custom Full-Tilt Aluminum Cab, Pumper, 4x2, Aluminum Body, Tandem Axle, 1250 GPM Pump, Mid-Mounted
FS19EEC08 Type I Wildland Urban Interface, Midship, 1250 GPM, Aluminum Body, Spartan Metro Star, 4- Door, Tilt Cab, Single Axle
FS19EEC09 Pumper, Midship, 1250 GPM, Aluminum Body, Spartan M etro Star, 4-Door, Tilt Cab, Single Axle FS19EEC10 Pumper, Midship, 1250 GPM, IPS, Aluminum Body, Spar tan Metro Star, 4 Door, Tilt Cab, Single Axle
C. Pumper Fire Apparatus
B. Wildland Fire Apparatus (Brush Fire)

Page 36 of 47 ends

FS19EED01 Non Walk-In Rescue, Aluminum Body, Ford F550, 2-Door, 4X2, Single Axle FS19EED02 Non Walk-In Rescue, Aluminum Body, International 4400, 2-Door, 4X2, Single Axle FS19EED03 Non Walk-In Rescue, Aluminum Body, Spartan Metro Star, 4-Door, Tilt Cab, 4X2, Single Axle FS19EED04 Walk-In Rescue, Aluminum Body, International 4400, 2-Door, 4x2, Single Axle FS19EED05 Walk-In Rescue, Aluminum Body, Spartan Metro Star, 4-Door, Tilt Cab, 4x2, Single Axle FS19EEE01 Pumper/Tanker, Midship, 1250 GPM, Aluminum Body, Freightliner Chassis, 2-Door, 4X2, Single Axle
FS19EEE02 Pumper/Tanker, Midship, 1250 GPM, Aluminum Body, International Chassis, 2-Door, 4X2, Single Axle
FS19EEE03 Pumper/Tanker, Midship, 1250 GPM, Aluminum Body, Kenworth Chassis, 2-Door, 4X2, Single Axle
FS19EEE04 Pumper/Tanker, Midship, 1250 GPM, Aluminum Body, Freightliner Chassis, 2-Door, 4X2, Tandem Axle
FS19EEE05 Elliptical Tanker, Midship, 1250 GPM, 2000 Gallon Tank, Stainless Steel Body, Freightliner Chassis, 2-Door, Single Axle
FS19EEE06 Elliptical Tanker, Midship, 1250 GPM, 2000 Gallon Tank, Stainless Steel Body, International Chassis, 2-Door, Single Axle
FS19EEE07 Elliptical Tanker, Midship, 1250 GPM, 2000 Gallon Tank, Stainless Steel Body, Kenworth Chassis, 2-Door, Single Axle
FS19EEE08 Elliptical Tanker, Midship, 1250 GPM, 3000 Gallon Tank, Stainless Steel Body, Freightliner Chassis, 2-Door, Tandem Axle
FS19FFB01
Summit Fire Single Rear Wheel Brush Unit, 200 Gallon Tank, 11HP Rear Mounted Gasoline Pump, 116L" x 86w" Aluminum Platform Body W/ Bulkhead & Side Storage Boxes, Ford F350, 2 Door Chassis, 4x4, Single Rear Wheel, 60" CA FS19FFB02
Summit Fire Brush Unit, 200 Gallon Tank, 11HP Rear Mounted Gasoline Pump, 116" Aluminum Platform Body W/ Bulkhead & Side Storage Boxes, Ford F350 2 Door Chassis, 4x4, 60" CA
FS19FFB03
Summit Fire Brush Unit, 300 Gallon Tank, 11HP Rear Mounted Gasoline Pump, 116" Aluminum Platform Body W/ Bulkhead & Side Storage Boxes, Ford F450, 2 Door Chassis, 4x4, 60" CA
FS19FFB04
Summit Fire Brush Unit, 300 Gallon Tank, 18HP Rear Mounted Gasoline Pump, 116" Aluminum Platform Body W/ Bulkhead & Side Storage Boxes, Ford F450, 2 Door Chassis, 4x4, 60" CA
FS19FFB05
Summit Fire Brush Unit, 300 Gallon Tank, 18HP Rear Mounted Gasoline Pump, 116" Aluminum Platform Body W/ Bulkhead & Side Storage Boxes, Ford F550, 2 Door Chassis, 4x4, 60" CA
FS19FFB06
Summit Fire Brush Unit, 300 Gallon Tank, 18HP Rear Mounted Gasoline Pump, 116" Aluminum Platform Body W/ Bulkhead & Side Storage Boxes, Ford F550, 4 Door Chassis, 4x4, 60" CA
FS19FFB07
Summit Fire Brush Unit, 400 Gallon Tank, 23HP Rear Mounted Gasoline Pump, 116" Aluminum Platform Body W/ Bulkhead & Side Storage Boxes, Ford F550, 2 Door Chassis, 4x4, 60" CA
FS19FFB08 Summit Fire Severe Duty Brush Unit, 300 Gallon Tank, 18HP Rear Mounted Gasoline Pump, 116" Aluminum Platform Body W/ Bulkhead & Side Storage Boxes, Ford F550, 2 Door Chassis, 4x4, Large Tire & Wheel Package, Super Single Rear Wheel, 60" CA E. Pumper/Tankers & Tankers
D. Special Service Apparatus (Walk-In & Non-Walk-in Bodies) Multi-use: Rescue, Re-Hab, Hazmat, Mobile Command Center
FF. Summit
B. Wildland Fire Apparatus (Brush Fire)

Page 37 of 47 ends

FS19FFB09 Summit Fire Severe Duty Brush Unit, 300 Gallon Tank, 23HP Rear Mounted Gasoline Pump, 116" Aluminum Platform Body W/ Bulkhead & Side Storage Boxes, Ford F550, 2 Door Chassis, 4x4, Large Tire & Wheel Package, Super Single Rear Wheel, 60" CA FS19FFB10 Summit Fire Brush / Utility ERB Unit, 250 Gallon Tank, 18HP Rear Mounted Gasoline Pump, 112" Aluminum Roll Up Door Body, Ford F550, 2 Door Chassis, 4x4, 60" CA FS19FFB11 Summit Fire Brush / Utility ERB Unit, 250 Gallon Tank, 18HP Rear Mounted Gasoline Pump, 140" Aluminum Roll Up Door Body, Ford F550, 2 Door Chassis, 4x4, 84" CA FS19FFB12 Summit Fire Brush / Utility ERB Unit, 250 Gallon Tank, 18HP Rear Mounted Gasoline Pump, 112" Aluminum Roll Up Door Body, RAM 5500, 2 Door Chassis, 4x4, 60" CA FS19FFB13 Summit Fire Brush / Utility ERB Unit, 250 Gallon Tank, 18HP Rear Mounted Gasoline Pump, 140" Aluminum Roll Up Door Body, RAM 5500, 2 Door Chassis, 4x4, 84" CA FS19FFC01 Summit Fire Quick Attack / Mini Piumper, 500 GPM PTO Pump, 300 Gallon tank, Aluminum Roll Up Door Short Body, Ford F550, 2 door , 4x4, 84" CA FS19FFC02 Summit Fire Quick Attack / Mini Piumper, 500 GPM PTO Pump, 300 Gallon tank, Aluminum Roll Up Door Tall Body, Ford F550, 4 door , 4x4, 84" CA FS19FFC03 Summit Fire Quick Attack / Mini Piumper, 1000 GPM MidShip Pump, 300 Gallon tank, Aluminum Roll Up Door Short Body, Ford F550, Super Cab, 4x4, 84" CA FS19FFC04 Summit Fire Quick Attack / Mini Piumper, 1000 GPM Midship Pump, 300 Gallon tank, Aluminum Roll Up Door Short Body, Ford F550, 4 door , 4x4, 84" CA FS19FFC05
Summit Fire Quick Attack / Mini Piumper, 1000 GPM Midship Pump, 300 Gallon tank, Aluminum Roll Up Door, Short Body, Enclosed Pump House, Ford F550, Super Cab, 4x4, 84" CA
FS19FFC06
Summit Fire Quick Attack / Mini Piumper, 1000 GPM Midship Pump, 300 Gallon tank, Aluminum Roll Up Door, Short Body, Enclosed Pump House, Ford F550, 4 door , 4x4, 84" CA
FS19FFC07 Summit Fire Quick Attack / Mini Piumper, 1250 GPM Midship Pump, 300 Gallon tank, Aluminum Roll Up Door, Short Body, Ford F550, Super Cab, 4x4, 84" CA FS19FFC08 Summit Fire Quick Attack / Mini Piumper, 1250 GPM Midship Pump, 300 Gallon tank, Aluminum Roll Up Door, Short Body, Ford F550, 4 door , 4x4, 84" CA FS19FFC09
Summit Fire Severe Duty Quick Attack / Mini Piumper, 1250 GPM Midship Pump, 300 Gallon tank, Aluminum Roll Up Door, Short Body, Ford F550, 4 door, 4x4, 84" CA, Large Tire & Wheel Package
FS19FFC10
Summit Fire Severe Duty Quick Attack / Mini Piumper, 1250 GPM Midship Pump, 300 Gallon tank, Aluminum Roll Up Door, Short Body, Ford F550, 4 door , 4x4, 84" CA, Large Tire & Wheel Package
FS19FFC11 Summit Commercial Smart Pumper, Highside / Lowside Aluminum Swing Door Body, 1250 GPM Midship Pump, 1000 Gallon Tank, Freigtliner M2, 2 Door FS19FFC12 Summit Commercial Smart Pumper, Highside / Lowside Aluminum Roll Up Door Body, 1250 GPM Midship Pump, 1000 Gallon Tank, Freigtliner M2, 2 Door FS19FFC13 Summit Commercial Rescue Style Pumper, Aluminum Roll Up Door Body, 1250 GPM Midship Pump, 750 Gallon Tank, Freigtliner M2, 2 Door
FS19FFC14 Summit Commercial Rescue Style Pumper, Aluminum Roll Up Door Body, 1250 GPM Midship Pump, 1000 Gallon Tank, Freigtliner M2, 2 Door, FS19FFC15 Summit Commercial Rescue Style Pumper, HighSide / Midside Aluminum Roll Up Door Body, 1250 GPM Midship Pump, 750 Gallon Tank, Freig tliner M2, 2 Door FS19FFC16 Summit Fire Custom Smart Pumper, HighSide / Lowside Aluminum Swing Door Body, 1250 GPM Midship Pump, 1000 Gallon Tank, Spartan, 4 Door Custom Cab Chassis C. Pumper Fire Apparatus

Page 38 of 47 ends

FS19FFC17 Summit Fire Custom Smart Pumper, HighSide / Highside Aluminum Swing Door Body, 1250 GPM Midship Pump, 1000 Gallon Tank, Spartan, 4 Door Custom Cab Chassis FS19FFC18
Summit Fire Custom Cab Rescue Style Pumper, Aluminum HighSide/Midside, Roll Up Door Body, 1250 GPM Midship Pump, 750 Gallon Tank, Spartan, 4 Door Custom Cab Chassis
FS19FFC19
Summit Fire Custom Cab Rescue Style Pumper, Aluminum HighSide/Highside, Roll Up Door Body, 1250 GPM Midship Pump, 750 Gallon Tank, Spartan, 4 Door Custom Cab Chassis
FS19FFC20 Summit Fire Custom Cab Stainless Steel Pumper, HighSide/Midside, Roll Up Door Body, 1250 GPM Midship Pump, 750 Gallon Tank, Spartan, 4 Door Custom Cab Chassis FS19FFC21 Summit Fire Custom Cab Stainless Steel Pumper, HighSide/Highside, Roll Up Door Body, 1250 GPM Midship Pump, 750 Gallon Tank, Spartan, 4 Door Custom Cab Chassis FS19FFC22
Summit Fire Custom Cab Pumper Rescue, Aluminum HighSide/Highside, Roll Up Door Body, Roof Top Storage, 1250 GPM Midship Pump, 750 Gallon Tank, Spartan, 4 Door Custom Cab Chassis
FS19FFC23
Summit Fire Custom Cab Pumper Rescue, Aluminum HighSide/Highside, Roll Up Door Body, Roof Top Storage, (Tall Body) 1250 GPM Midshi p Pump, 750 Gallon Tank, Spartan, 4 Door Custom Cab Chassis
FS19FFD01 Summit Fire Remote Evacuation & Deployment Wagon (R.E.D Wagon) FS19FFD02 Summit Fire Remote Evacuation & Deployment Wagon T.W.O (R.E.D Wagon Trail & Wildland)
FS19FFD03 Summit Fire Rescue ERB Unit, 7 bay, 112" Aluminum Roll Up Door Body, Ford F550, 2 Door Chassis, 4x4, 60" CA
FS19FFD04 Summit Fire Rescue ERB Unit, 7 bay, 112" Aluminum Roll Up Door Body, RAM 5500, 2 Door Chassis, 4x4, 60" CA
FS19FFD05 Summit Fire Rescue ERB Unit, 7 bay, 140" Aluminum Roll Up Door Body, Ford F550, 2 Door Chassis, 4x4, 84" CA
FS19FFD06 Summit Fire Rescue ERB Unit, 7 bay, 140" Aluminum Roll Up Door Body, RAM 5500, 2 Door Chassis, 4x4, 84" CA
FS19FFD07 Summit Fire Medium Duty Rescue, Aluminum 14 foot, 7 Bay Rescue, Roll up Door, Freightliner M2 chassis, 2 Door
FS19FFD08 Summit Fire Medium Duty Rescue, Aluminum 16 foot, 9 Bay Rescue, Roll up Door, Freightliner M2 chassis, 2 Door
FS19FFD09 Summit Fire Custom Cab Heavy Rescue, Aluminum 18 foot, 9 Bay Rescue, Roll Up Door, Roof Top Storage, Spartan 4door Custom Cab.

FS19FFD10 Summit Fire Custom Cab Heavy Rescue, Stainless Steel 18 foot, 9 Bay Rescue, Roof top Storage, Roll Up Door, Spartan 4door Custom Cab Chassis.

FS19FFD11 Summit Fire Custom Cab Heavy Rescue, Aluminum 20 foot, 9 Bay Rescue, Roll Up Door, Roof top Storage, Spartan 4door Custom Cab Chassis.

FS19FFD12 Summit Fire Custom Cab Heavy Rescue, Stainless Steel, 20 foot, 9 Bay Rescue, Roll Up Door, Roof top Storage, Spartan 4door Custom Cab Chassis.

FS19FFE01 Summit Fire ETB Economy Tanker, 1800 Gallon Poly Elliptical Tank, Single Rear Manual Dump Chute, Freightliner M2 Chassis cab, 2 Door, Single Rear Axle FS19FFE02 Summit Fire ETB Economy Tanker, 3000 Gallon Poly Elliptical Tank, Single Rear Manual Dump Chute, Freightliner M2 Chassis cab, 2 Door, Tandem Rear Axle FS19FFE03
Summit Fire ETB Pumper Tanker, 1800 Gallon Poly Elliptical Tank, Single Rear Manual Dump Chute, 1250 GPM Midship Pump, Freightliner M2 Chassis cab, 2 Door, Single Rear Axle
D. Special Service Apparatus (Walk-In & Non-Walk-in Bodies) Multi-use: Rescue, E. Pumper/Tankers & Tankers

Page 39 of 47 ends

FS19FFE04
Summit Fire ETB Pumper Tanker, 3000 Gallon Poly Elliptical Tanker, Single Rear Manual Dump Chute, 1250 GPM Midship Pump, Freightliner M2 Chassis cab, 2 Door, Tandem Rear Axle
FS19FFE05 Summit Fire Wetside Square Tanker, 2000 Gallon Poly Tank, Single Rear Manual Dump Chute, Freightliner M2 Chassis cab, 2 Door, Single Rear Axle FS19FFE06 Summit Fire Wetside Square Tanker, 3000 Gallon Poly Tank, Single Rear Manual Dump Chute, Freightliner M2 Chassis cab, 2 Door, Tandem Rear Axle FS19FFE07
Summit Fire Wetside Pumper Tanker, 1800 Gallon Poly Tanker, Single Rear Manual Dump Chute, 1250 GPM Midship Pump, Freightliner M2 Chassis cab, 2 Door, Single Rear Axle
FS19FFE08 Summit Fire Wetside Pumper Tanker, 3000 Gallon Poly Tank, Single Rear Manual Dump Chute, 1250 GPM Midship Pump, Freightliner M2 Chassis cab, 2 Door, Tandem Rear Axle FS19FFE09 Summit Fire Dryside Tanker, 2000 Gallon Poly Tank, Single Rear Manual Dump Chute, Freightliner M2 Chassis cab, 2 Door, Single Rear Axle
FS19FFE10 Summit Fire Dryside Tanker, 3000 Gallon Poly Tank, Single Rear Manual Dump Chute, Freightliner M2 Chassis cab, 2 Door, Tandem Rear Axle
FS19FFE11 Summit Fire Dryside Pumper Tanker, 1800 Gallon Poly Tanker, Single Rear Manual Dump Chute, 1250 GPM Midship Pump, Freightliner M2 Chassis cab, 2 Door, Single Rear Axle FS19FFE12 Summit Fire Dryside Pumper Tanker, 3000 Gallon Poly Tank, Single Rear Manual Dump Chute, 1250 GPM Midship Pump, Freightliner M2 Chassis cab, 2 Door, Tandem Rear Axle FS19FFE13 Summit Fire Stainless Steel Elliptical Tanker, 2000 Gallon Stainless Wrapped Poly Tank, Freightliner M2 Chassis, 2 Door, Sigle Rear Axle
FS19FFE14 Summit Fire Stainless Steel Elliptical Tanker, 3000 Gallon Stainless Wrapped Poly Tank, Freightliner M2 Chassis, 2 Door, Tandem Rear Axle
FS19FFE15 Summit Fire Commercial Dryside Stainless Steel Tanker, 3000 Gallon Poly Tank, Freightliner M2 Chassis, 2 Door, Tandem Rear Axle
FS19FFE16 Summit Fire Custom Cab Dryside Stainless Steel Tanker, 3000 Gallon Stainless Wrapped Poly Tank, Spartan 4 Door Custom Cab & Chassis, Tandem Rear Axle FS19GGB01 Ford F450, 2-door, Aluminum Fabricated Flatbed Body, 9' Flatbed Wildland Vehicle FS19GGB02 Dodge 5500, 2-door, Aluminum Fabricated Flatbed Body, 9' Flatbed Wildland Vehicle FS19GGB03 Ford F450, 2-door, Aluminum Extruded Body, 10' Quick Attack Wildland Vehicle FS19GGB04 Dodge 5500, 2-door, Aluminum Extruded Body, 10' Quick Attack Wildland Vehicle FS19GGB05 Skid Unit for Slide in Style Body
FS19GGD01 Ford F450, 2-door, Aluminum Extruded Body, 10' Light Rescue Vehicle FS19GGD02 Dodge 5500, 2-door, Aluminum Extruded Body, 10' Light Rescue Vehicle FS19GGD03 Freightliner M2, 2-door Aluminum Extruded Body, 18' Walk-in Rehabilitation Vehicle FS19GGD04 IHC 4400, 2-door Aluminum Extruded Body, 18' Walk-in Rehabilitation Vehicle FS19GGD05 Freightliner M2, 2-door Aluminum Extruded Body, 18' Non-Walk-in Rescue Vehicle FS19GGD06 IHC 4400, 2-door Aluminum Extruded Body, 18' Non-Walk-in Rescue Vehicle FS19GGD07 Freightliner M2, 2-door Aluminum Extruded Body, 18' Command Vehicle FS19GGD08 IHC 4400, 2-door Aluminum Extruded Body, 18' Command Vehicle B. Wildland Fire Apparatus (Brush Fire)
D. Special Service Apparatus (Walk-In & Non-Walk-in Bodies) Multi-use: Rescue, Re-Hab, Hazmat, Mobile Command Center
GG. Sunbelt Fire, Inc.

Page 40 of 47 ends

FS19HHB01 Ford F550, 2-Door, OEM Cab, 4x4, Single Axle, Aluminum Body, 100 GPM, 250 Gal Tank Slip-In, Wildland Type 6
FS19HHB02 International HV507, 4-Door, OEM Cab, 4x4, Aluminum Body, Single Axle, 500 GPM, 500 Gallon, Mid-Mounted Wildland Type 3
FS19HHC01 International MV607, 2-Door, OEM Cab, 4x2, Aluminum Body, Single Axle, 1250 GPM Pump, Mid- Mounted Pumper
FS19HHC02 Spartan 4-Door Chassis, Aluminum Tilt Cab, 4x2, Aluminum Body, Single Axle, 1250 GPM Pump, Mid-Mounted Pumper
FS19HHC03 Ford F550, 4-Door, OEM Cab, 4x2, Aluminum Body, Sin gle Axle, 1250 GPM Pump, 300 Gallon, Mid-Mounted Pumper
FS19HHD01 Ford F550, 2-Door, OEM Cab, 4x2, Single Axle, Aluminum Body, Non-Walk-In Rescue FS19HHD02 International MV607, 2-Door, OEM Cab, 4x2, Single A xle, Aluminum Body, Non-Walk-In Rescue FS19HHD03 Spartan 4-Door Chassis, Aluminum Tilt Cab, 4x2, Single Axle, Aluminum Body, Non-Walk-In Body FS19HHD04 International MV607, 2-Door, OEM Cab, 4x2, Single A xle, Aluminum Body, Walk-In Rescue FS19HHD05 Spartan 4-Door Chassis, Aluminum Tilt Cab, 4x2, Single Axle, Aluminum Body, Walk-In Body FS19HHD06 International MV607, 2-Door, OEM Cab, 4 x 2 Single Axle, Aluminum Body, Mobile Bauer Compressor Unit
FS19HHE01 International MV607, 2-Door, OEM Cab, 4x2, Aluminum Body, Single Axle, 2,000 Gallon Tanker, 500 GPM Pump
FS19IIA01 Sutphen SA75, Custom 4-Door Full-Tilt Aluminum Cab, Stainless Steel Body, Single Axle, 75' Mid Mounted 1000# Telescoping Aluminum Box Boom with Climbing Ladder FS19IIA02 Sutphen SL75, Custom 4-Door Full-Tilt Aluminum Cab, Stainless Steel Body, Single Axle, 75' Mid Mounted 1000# Aluminum Ladder
FS19IIA03 Sutphen SL100, Custom 4-Door Full-Tilt Aluminum Cab, Stainless Steel Body, Tandem Axle, 100' Mid Mounted 750# Aluminum Ladder
FS19IIA04 Sutphen SP70, Custom 4-Door Full-Tilt Aluminum Cab, Stainless Steel Body, Single Axle, 70' Mid Mounted 1000# Telescoping Aluminum Box Boom with Platform FS19IIA05 Sutphen SP95, Custom 4-Door Full-Tilt Aluminum Cab, Stainless Steel Body, Tandem Axle, 95' Mid Mounted 1000# Telescoping Aluminum Box Boom with Platform FS19IIA06 Sutphen SPH100, Custom 4-Door Full-Tilt Aluminum Ca b, Stainless Steel Body, Tandem Axle, 100' Mid Mounted 1000# Telescoping Aluminum Box Boom with Platform FS19IIA07 Sutphen SP110, Custom 4-Door Full-Tilt Aluminum Cab , Stainless Steel Body, Tandem Axle, 110' Mid Mounted 1000# Telescoping Aluminum Box Boom with Platform FS19IIA08 Sutphen SLR75, Custom 4-Door Full-Tilt Aluminum Cab, Stainless Steel Body, Single Axle, 75' Rear Mounted 750# Aluminum Ladder
FS19IIA09 Sutphen SLR108, Custom 4-Door Full-Tilt Aluminum Cab, Stainless Steel Body, Tandem Axle, 108' Rear Mounted 750# Aluminum Ladder
FS19IIB01 Sutphen/International 7400 4x4, Type 3 Pumper, 4-Do or Commercial Cab, Extruded Aluminum Body, Single Axle, 750 GPM Mid-Mounted Two-Stage Pump
II. Sutphen Corporatation (Sutphen)
B. Wildland Fire Apparatus (Brush Fire)
A. Aerials (Booms/Platforms, Ladders, Ladder/Platfo rms) HH. SVI Trucks
B. Wildland Fire Apparatus (Brush Fire)
C. Pumper Fire Apparatus
D. Special Service Apparatus (Walk-In & Non-Walk-in Bodies) Multi-use: Rescue, Re-Hab, Hazmat, Mobile Command Center
E. Pumper/Tankers & Tankers

Page 41 of 47 ends

FS19IIB02 Sutphen Custom Wildland Urban Interface Pumper, 4 Door Full Tilt Aluminum Cab, Extruded Aluminum Body, Single Axle, 1250 GPM Mid-Mounted Pump
FS19IIC01 Sutphen/International 4400, 2-Door Commercial Cab, Pumper, Extruded Aluminum Body, Single Axle, 1250 GPM Mid-Mounted Single Stage Pump
FS19IIC02 Sutphen Program 1 Custom-Pumper, 4 Door Full Tilt Aluminum Cab, Extruded Aluminum Body, Single Axle, 1250 GPM Mid-Mounted Pump
FS19IIC03 Sutphen Program 2 Custom Pumper, 4 Door Full Tilt Aluminum Cab, Extruded Aluminum Body, Single Axle, 1250 GPM Mid-Mounted Pump
FS19IIC04 Sutphen Fully Customized Pumper, 4 Door Full Tilt Aluminum Cab, Extruded Aluminum Body, Single Axle, 1250 GPM Mid-Mounted Pump
FS19IID01 Sutphen Custom Rescue, Non-Walk-In, 4 Door Full Tilt Aluminum Cab, Single Axle, Formed Aluminum Body
FS19IIE01 Sutphen/International Pumper/Wetside Tanker, 2-Door Commercial Cab, Stainless Steel Body, Single Axle, 1250 GPM Mid-Mounted Pump
FS19IIE02 Sutphen/International Pumper/Eliptical Tanker, 2-Door Commercial Cab, Stainless Steel Body, Single Axle, 1250 GPM Mid-Mounted Pump
FS19IIE03 Sutphen/International Pumper/Wetside Tanker, 2-Door Commercial Cab, Stainless Steel Body, Tandem Axle, 1250 GPM Mid-Mounted Pump
FS19IIE04 Sutphen/International Pumper/Eliptical Tanker, 2-Door Commercial Cab, Stainless Steel Body, Tandem Axle, 1250 GPM Mid-Mounted Pump
FS19IIE05 Sutphen Custom Pumper Tanker, 4 Door Full Tilt Aluminum Cab, Extruded Aluminum Body, Tandem Axle, 1250 GPM Mid-Mounted Pump
FS19JJA01 Toyne, single axle, Spartan chassis, 75' rear mount aerial, stainless steel body, 300 gallons, side stack hosebed, single stage 1500 gpm pump mid mounted
FS19JJA02 Toyne tandem axle, Spartan chassis, 110' rear mount aerial with stainless steel body, 300 gallons of water, side stack hosebed, single stage 1500 gpm pump mid mounted FS19JJA03 Toyne tandem axle, Spartan chassis, rear mount 100' platform, stainless steel body, 300 gallons of water, hosebed, single stage 1500 gpm pump mid mounted
FS19JJA04 Toyne tandem axle, Spartan chassis, mid-mount 100” platform, stainless steel body, 300 gallons of water, hosebed, single stage 1500 gpm pump mid mounted FS19JJA05 Toyne single axle, Spartan chassis 50’ Tele Squirt, stainless steel body, 500 gallons of water, hose bed, single state 1,250 GPM pump mid mounted
FS19JJB01 Toyne, Ford F550 4 door, staineless steel body, 100 0 gpm midship pump, 300 gallons of water FS19JJC01 Freightliner M2, 2-Door Commercial Cab, Pumper, stainless steel Body, Single Axle, 1250 GPM Pump, Single Stage, Mid-Mounted, 750 gallons of wat er
FS19JJC02 International 4400, 2-Door Commercial Cab, Pumper, stainless steel Body, Single Axle, 1250 GPM Pump, Single Stage, Mid-Mounted, 750 gallons of wat er
FS19JJC03 Kenworth, 2-Door Commercial Cab, Aluminum Body, Single Axle, 1250 GPM Pump, Mid- Mounted, 750 gallons of water
FS19JJC04 Spartan, 4 Door Custom Full Tilt Aluminum Cab, Pumper, stainless steel Body, Single Axle, 1250 GPM Pump, Mid Mounted, 750 gallons of water
FS19JJD01 International 4400, 2-Door, Commercial Cab, Single Axle, stainless steel Body, Non-Walk-In Rescue (walk around type)
FS19JJD02 Spartan, 4-Door, Full-Tilt, Aluminum Cab, Single Axle, stainless steel Body, Non-Walk-In Body (walk around type)
B. Wildland Fire Apparatus (Brush Fire)
C. Pumper Fire Apparatus
D. Special Service Apparatus (Walk-In & Non-Walk-in Bodies) Multi-use: Rescue, Re-Hab, Hazmat, Mobile Command Center
E. Pumper/Tankers & Tankers
C. Pumper Fire Apparatus
D. Special Service Apparatus (Walk-In & Non-Walk-in Bodies) Multi-use: Rescue, Re-Hab, Hazmat, Mobile Command Center
JJ. Toyne
A. Aerials (Booms/Platforms, Ladders, Ladder/Platfo rms)

Page 42 of 47 ends

FS19JJD03 Ford F550, 4 door Cab, Single Axle, stainless steel body, Non-Walk-In Rescue (walk around type) FS19JJE01 International, 2-Door, Commercial Cab, Pumper/Tanker, stainless steel Body, Tandem Axle, 1250 GPM Pump, Mid-Mounted, 2500 gallons
FS19JJE02 Spartan, 4-Door, Custom Full-Tilt, Aluminum Cab, Pumper/Tanker, stainless steel Body, Tandem Axle, 1250 GPM Pump, Mid-Mounted, 2500 gallons
FS19JJE03 International, 2-Door, Commercial Cab, Elliptical Tpumper/tanker, welded stainless steel Body, Tandem Axle, 1250 GPM Pump, 2000 gallon
FS19JJE04 International, 2-Door, Commercial Cab, wetside pumper/tanker, aluminum treadplate Body, single Axle, 750 gpm Pump, 3000 gallon
FS19KKE01 Elliptical Tanker, Midship Pump, 1250 GPM, 2000 Gal lon Tank, Stainless Steel Body, Freightliner Chassis, 2-Door, Single Axle
FS19KKE02 Elliptical Tanker, Midship Pump, 1250 GPM, 2000 Gal lon Tank, Stainless Steel Body, International Chassis, 2-Door, Single Axle
FS19KKE03 Elliptical Tanker, Midship Pump, 1250 GPM, 2000 Gal lon Tank, Stainless Steel Body, Kenworth Chassis, 2-Door, Single Axle
FS19KKE04 Elliptical Tanker, Midship Pump, 1250 GPM, 3000 Gal lon Tank, Stainless Steel Body, Freightliner Chassis, 2-Door, Tandem Axle
FS19KKE05 Wet Side Tanker, Midship Pump, 1250 GPM, 2000 Gallo n Tank, Stainless Steel Body, Freightliner Chassis, 2-Door, Single Axle
FS19KKE06 Wet Side Tanker, Midship Pump, 1250 GPM, 2000 Gallo n Tank, Stainless Steel Body, International Chassis, 2-Door, Single Axle
FS19KKE07 Wet Side Tanker, Midship Pump, 1250 GPM, 2000 Gallo n Tank, Stainless Steel Body, Kenworth Chassis, 2-Door, Single Axle
FS19KKE08 Wet Side Tanker, Midship Pump, 1250 GPM, 3000 Gallo n Tank, Stainless Steel Body, Freightliner Chassis, 2-Door, Tandem Axle
FS19LLB01 Unruh Fire 11 ft Attack Brush, extruded aluminum brush body with crosswalk, F550, 4x4 FS19LLB02 Unruh Fire 9 ft Attack brush, extruded aluminum brush body with work stations, F550, 4x4 FS19LLB03 Unruh Fire 9 ft Attack Brush, extruded aluminum flatbed brush body, F550, 4x4 FS19LLD01 doors,
F550 4x4
FS19LLD02 Unruh Fire 11 ft Rapid Rescue, extruded aluminum dry rescue body, compartments with 7 roll up doors, F550, 4x4
FS19LLD03 Unruh Fire 9 ft Rapid Rescue, extruded aluminum wet rescue body with 6 roll up door compartments, F550, 4x4
FS19LLD04 Unruh Fire 11 ft Rapid Rescue, extruded aluminum wet rescue body, compartments with 6 roll up doors, F550, 4x4
FS19LLF01 Unruh Fire 12 ft ARFF Rescue, extruded aluminum body with 6 roll up door compartments, 500lbs dry chemical, engine driven pump, F550, 4x4
FS19LLF02 Unruh Fire 12 ft ARFF Rescue, extruded aluminum body with 6 roll up door compartments, stored energy CAFS, 500 lbs dry chemical, F550, 4x4
F. Airport Rescue Fire-Fighting Vehicles
E. Pumper/Tankers & Tankers
LL. Unruh Fire, Inc.

B. Wildland Fire Apparatus (Brush Fire)
B. Wildland Fire Apparatus (Brush Fire)
KK. U S Tanker
D. Special Service Apparatus (Walk-In & Non-Walk-in Bodies) Multi-use: Rescue, Re-Hab, Hazmat, Mobile Command Center
E. Pumper/Tankers & Tankers
MM. Weis Fire & Safety Equipment Co.

Page 43 of 47 ends

FS19MMB01 Weis Fire Quick Attack 300, Rear Mount Pump Controls, 9’ EXT Alum Fire Body with Walkway, on Ford F-350, 60” CA
FS19MMB02 Weis Fire Quick Attack 300, Rear Mount Pump Controls, 9’ EXT Alum Fire Body with Walkway, on Ford F-450 60” CA
FS19MMB03 Weis Fire Quick Attack 400, Rear Mount Pump Controls, 11’ EXT Alum Fire Body with Walkway, on Ford F-550 84” CA
FS19MMB04 Weis Fire Quick Attack 500, Rear Mount Pump Controls, 11’ EXT Alum Fire Body with Walkway, on Ford F-550 84” CA
FS19MMB05 Weis Fire Quick Attack 300, Rear Mount Pump Controls, 9’ EXT Alum Fire Body with Walkway, on Dodge 5500 Crew Cab, 60” CA
FS19MMB06 Weis Fire Quick Attack 400, Rear Mount Pump Controls, 9’ EXT Alum Fire Body with Walkway, on Dodge 5500 Crew Cab, 60” CA
FS19MMB07 Weis Fire Quick Attack 400, Rear Mount Pump Controls, 11’ EXT Alum Fire Body with Walkway, on Dodge 5500 84” CA
FS19MMB08 Weis Fire Quick Attack 500, Rear Mount Pump Controls, 11’ EXT Alum Fire Body with Walkway, on Dodge 5500 84” CA

Page 44 of 47 ends

FORM E - PUBLISHED OPTIONS Procurement No.: FS12-19 Offeror
Name:

Code or
Part No. Option Description Offered
Price
Note: Bidder must identify each option bid with an identifying Code or Part No. that should be refere nced on all Contract Pricing Worksheets
3) Completely describe each option, including manufacturer's code or part numbers as appropriate. Each item listed MUST have a unique code or part number.
4) Options which replace standard equipment on a base bid Item on Form D should be priced net of any credit due for the replaced item.
1) Bid each Option on a single separate line. Bidder is responsible to identify each item with a specific code or part number.
2) Use a single Form E for ALL items. Add/Insert additional lines as necessary.

Notes:
(Important)
5) Options which are shown as upgrades/downgrades of a base bid item on Form D should be priced at the differential amount between the base bid item and the option. 6) You encouraged to offer specific manufacturer's catalogs (eg. Whelan, Fed Signal, etc.) as options, with 'List Less' or 'Cost Plus' percentages for pricing. Copy of catalog should be supplied w/bid.

Page 45 of 47 ends

FORM G: SPECIAL STATEMENT OF WARRANTY
FS12-19 “Fire Service Apparatus ( All Types)”

This form shall be completed by the MANUFACTURER and signed by one of its Corporate Officers. No agent signature shall be acceptable on this document.

____________________________________________________________ , the "Manufacturer" , warrants each newly manufactured Fire Apparatus, to the original user/purchaser only for the specified periods stated below, from the date of acceptance, ordinary wear and tear excepted:

Component: Warranty:
•Cab & Chassis One (1) year, parts & labor
•Chassis Frame Rails Five (5) years, parts & labor
•Diesel Engine Five (5) years, parts & labor
•Transmission Five (5) years, parts & labor
•Fire Pump One (1) year, parts & labor
•Fire Pump Panel Gauge One (1) year, parts & labor
•Water Tank Twenty (20) years, parts & labor
•Apparatus Body One (1) year, parts & labor
Ten (10) years, rust/corrosion penetration
Ten (10) years or 100,000 miles, structural warranty
Three (3) years, paint
•Aerial Device Twenty (20) years, structural
Two (2) years, hydraulic components
One (1) year, parts and labor
One (1) year, waterway

The Manufacturer's obligations under this warranty shall be specifically limited to replacing or repairing, as the Manufacturer may elect, any part or parts of such product which to the Manufacturer's examination discloses to be defective in material or workmanship.

Any part or parts considered to be covered by the conditions of this warranty shall be returned, freight prepaid, to the Manufacturer's factory located at ____________________________________________________________________________ or to such other location as may be approved in advance by the Manufacturer. Replaced or repaired parts determined to be included within the warranty shall be F.O.B. to the End User's physical location. Freight and labor to reinstall parts shall be paid by the Manufacturer .

The Manufacturer's warranty shall not apply to the following:
• Wear items.
• Normal adjustments and maintenance services.
• Failures resulting from the product being operated in a manner not in accordance with the operation manual or for a purpose not recommended by the Manufacturer . • Any product which shall have been repaired, modified, or altered in any way so as to have been adversely affected the units stability or reliability. • Items subjected to misuse, negligence, accident, or improper maintenance. • Loss of time or use of the product, inconvenience or other incidental expenses.

Any trade accessory that has its own warranty shall have said warranty document attached with the bid response. If a separate warranty equal or exceeding is not attached, then the Manufacturer warrants any trade accessory not specifically covered by a separate warranty.

Nothing contained in this warranty shall make the Manufacturer , liable beyond the express limitations hereof, for loss, injury, or damage of any kind to any person or entity resulting from any defect or failure of the product (except as covered by Product liability insurance).

THIS WARRANTY IS IN LIEU OF ALL OTHER WARRANTIES, E XPRESSED OR IMPLIED, INCLUDING WITHOUT LIMITATIONS, ANY IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PAR TICULAR PURPOSE.

MANUFACTURER:

Corporate Officer Signature:

Printed Name and Title:

WARRANTY ADMINISTRATOR :

Printed Name and Title:

Date:

Invitation No.: FS12-19 Form H - Marketing
Offeror Name:

Bidder shall provide a written narrative explaining in some detail activities that will be undertaken to actively marke t and promote an H-GAC contract to local government and non-profit End Users.

H-GAC
Houston-Galveston Area Council
P.O. Box 22777 · 3555 Timmons · Houston, Texas 77227-2777 Cooperative Agreement -

Page 1 of 7 ends

GENERAL PROVISIONS

This Agreement is made and entered into, by and between the Houston-Galveston Area Council hereinafter referred to as H-GAC having its principal place of business at 3555 Timmons Lane, Suite 120, Houston, Texas 77027 and ___________________., hereinafter referred to as the Contractor, having its principal place of business at ______________________________________.

WITNESSETH:

WHEREAS, H-GAC hereby engages the Contractor to perform certain services in accordance with the specifications of the Agreement; and

WHEREAS, the Contractor has agreed to perform such services in accordance with the specifications of the Agreement;

NOW, THEREFORE, H-GAC and the Contractor do hereby agree as follows:

ARTICLE 1: LEGAL AUTHORITY
The Contractor warrants and assures H-GAC that it possesses adequate legal authority to enter into this Agreement. The Contractor's governing body, where applicable, has authorized the signatory official(s) to enter into this Agreement and bind the Contractor to the terms of this Agreement and any subsequent amendments hereto.

ARTICLE 2: APPLICABLE LAWS
The Contractor agrees to conduct all activities under this Agreement in accordance with all applicable rules, regulations, directives, standards, ordinances, and laws, in effect or promulgated during the term of this Agreement, including without limitation, workers’ compensation laws, minimum and maximum salary and wage statutes and regulations, and licensing laws and regulations. When required, the Contractor shall furnish H-GAC with satisfactory proof of its compliance therewith.

ARTICLE 3: INDEPENDENT CONTRACTOR
The execution of this Agreement and the rendering of services prescribed by this Agreement do not change the independent status of H-GAC or the Contractor. No provision of this Agreement or act of H- GAC in performance of the Agreement shall be construed as making the Contractor the agent, servant or employee of H-GAC, the State of Texas or the United States Government. Employees of the Contractor are subject to the exclusive control and supervision of the Contractor. The Contractor is solely responsible for employee related disputes and discrepancies, including employee payrolls and any claims arising therefrom.

ARTICLE 4: WHOLE AGREEMENT
The General Provisions, Special Provisions, and Attachments, as provided herein, constitute the complete Agreement (“Agreement”) between the parties hereto, and supersede any and all oral and written agreements between the parties relating to matters herein. Except as otherwise provided herein, this Agreement cannot be modified without written consent of the parties.

ARTICLE 5: SCOPE OF SERVICES

Page 2 of 7 ends

The services to be performed by the Contractor are outlined in an Attachment to this Agreement.

ARTICLE 6: PERFORMANCE PERIOD
This Agreement shall be performed during the period which begins ________ and ends _______. All services under this Agreement must be rendered within this performance period, unless directly specified under a written change or extension provisioned under Article 15, which shall be fully executed by both parties to this Agreement.

ARTICLE 7: PAYMENT OR FUNDING
Payment provisions under this Agreement are outlined in the Special Provisions.

ARTICLE 8: REPORTING REQUIREMENTS
If the Contractor fails to submit to H-GAC in a timely and satisfactory manner any report required by this Agreement, or otherwise fails to satisfactorily render performances hereunder, H-GAC may terminate this agreement with notice as identified in Article 16 of these General Provisions. H-GAC has final determination of the adequacy of performance and reporting by Contractor. Termination of this agreement for failure to perform may affect Contractor’s ability to participate in future opportunities with H-GAC. The Contractor's failure to timely submit any report may also be considered cause for termination of this Agreement.

Any additional reporting requirements shall be set forth in the Special Provisions of this Agreement.

ARTICLE 9: INSURANCE
Contractor shall maintain insurance coverage for work performed or services rendered under this Agreement as outlined and defined in the attached Special Provisions.

ARTICLE 10: SUBCONTRACTS and ASSIGNMENTS
Except as may be set forth in the Special Provisions, the Contractor agrees not to subcontract, assign, transfer, convey, sublet or otherwise dispose of this Agreement or any right, title, obligation or interest it may have therein to any third party without prior written approval of H-GAC. The Contractor acknowledges that H-GAC is not liable to any subcontractor or assignee of the Contractor. The Contractor shall ensure that the performance rendered under all subcontracts shall result in compliance with all the terms and provisions of this Agreement as if the performance rendered was rendered by the Contractor. Contractor shall give all required notices, and comply with all laws and regulations applicable to furnishing and performance of the work. Except where otherwise expressly required by applicable law or regulation, H-GAC shall not be responsible for monitoring Contractor's compliance, or that of Contractor’s subcontractors, with any laws or regulations.

ARTICLE 11: AUDIT
Notwithstanding any other audit requirement, H-GAC reserves the right to conduct or cause to be conducted an independent audit of any transaction under this Agreement, such audit may be performed by the H-GAC local government audit staff, a certified public accountant firm, or other auditors designated by H-GAC and will be conducted in accordance with applicable professional standards and practices. The Contractor understands and agrees that the Contractor shall be liable to the H-GAC for any findings that result in monetary obligations to H-GAC.

ARTICLE 12: EXAMINATION OF RECORDS
The Contractor shall maintain during the course of the work complete and accurate records of all of the Contractor's costs and documentation of items which are chargeable to H-GAC under this Agreement.

H-GAC, through its staff or designated public accounting firm, the State of Texas, and United States Government, shall have the right at any reasonable time to inspect, copy and audit those records on or

Page 3 of 7 ends

off the premises by authorized representatives of its own or any public accounting firm selected by H- GAC. The right of access to records is not limited to the required retention period, but shall last as long as the records are retained. Failure to provide access to records may be cause for termination of the Agreement. The records to be thus maintained and retained by the Contractor shall include (without limitation): (1) personnel and payroll records, including social security numbers and labor classifications, accounting for total time distribution of the Contractor's employees working full or part time on the work, as well as cancelled payroll checks, signed receipts for payroll payments in cash, or other evidence of disbursement of payroll payments; (2) invoices for purchases, receiving and issuing documents, and all other unit inventory records for the Contractor's stocks or capital items; and (3) paid invoices and cancelled checks for materials purchased and for subcontractors' and any other third parties' charges.

The Contractor further agrees that the examination of records outlined in this article shall be included in all subcontractor or third-party agreements.

ARTICLE 13: RETENTION OF RECORDS
The Contractor and its subcontractors shall maintain all records pertinent to this Agreement, and all other financial, statistical, property, participant records, and supporting documentation for a period of no less than seven (7) years from the later of the date of acceptance of the final payment or until all audit findings have been resolved. If any litigation, claim, negotiation, audit or other action involving the records has been started before the expiration of the retention period, the records shall be retained until completion of the action and resolution of all issues which arise from it, or until the end of the seven (7) years, whichever is later, and until any outstanding litigation, audit, or claim has been fully resolved.

ARTICLE 14: CHANGES AND AMENDMENTS
A. Any alterations, additions, or deletions to the terms of this Agreement, which are required by changes in federal or state law or by regulations, are automatically incorporated without written amendment hereto, and shall become effective on the date designated by such law or by regulation.

B. To ensure the legal and effective performance of this Agreement, both parties agree that any amendment that affects the performance under this Agreement must be mutually agreed upon and that all such amendments must be in writing. After a period of no less than 30 days subsequent to written notice, unless sooner implementation is required by law, such amendments shall have the effect of qualifying the terms of this Agreement and shall be binding upon the parties as if written herein.

ARTICLE 15: TERMINATION PROCEDURES
The Contractor acknowledges that this Agreement may be terminated for Convenience or Default.

A. Convenience
H-GAC may terminate this Agreement at any time, in whole or in part, with or without cause, whenever H-GAC determines that for any reason such termination is in the best interest of H- GAC, by providing written notice by certified mail to the Contractor. Upon receipt of notice of termination, all services hereunder of the Contractor and its employees and subcontractors shall cease to the extent specified in the notice of termination.

The Contractor may cancel or terminate this Agreement upon submission of thirty (30) days written notice, presented to H-GAC via certified mail. The Contractor may not give notice of cancellation after it has received notice of default from H-GAC.

B. Default

Page 4 of 7 ends

H-GAC may, by written notice of default to the Contractor, terminate the whole or any part of the Agreement, in any one of the following circumstances:
(1) lf the Contractor fails to perform the services herein specified within the time specified herein or any extension thereof; or
(2) If the Contractor fails to perform any of the other provisions of this Agreement for any reason whatsoever, or so fails to make progress or otherwise violates the Agreements that completion of services herein specified within the Agreement term is significantly endangered, and in either of these two instances does not cure such failure within a period often (10) days (or such longer period of time as may be authorized by H-GAC in writing) after receiving written notice by certified mail of default from H-GAC.

ARTICLE 16: SEVERABILITY
H-GAC and Contractor agree that should any provision of this Agreement be determined to be invalid or unenforceable, such determination shall not affect any other term of this Agreement, which shall continue in full force and effect.

ARTICLE 17: FORCE MAJEURE
To the extent that either party to this Agreement shall be wholly or partially prevented from the performance of any obligation or duty placed on such party by reason of or through strikes, stoppage of labor, riot, fire, flood, acts of war, insurrection, accident, order of any court, act of God, or specific cause reasonably beyond the party's control and not attributable to its neglect or nonfeasance, in such event, the time for the performance of such obligation or duty shall be suspended until such disability to perform is removed. Determination of force majeure shall rest solely with H-GAC.

ARTICLE 18: CONFLICT OF INTEREST
No officer, member or employee of the Contractor or subcontractor, no member of the governing body of the Contractor, and no other public officials of the Contractor who exercise any functions or responsibilities in the review or Contractor approval of this Agreement, shall participate in any decision relating to this Agreement which affects his or her personal interest, or shall have any personal or pecuniary interest, direct or indirect, in this Agreement.

ARTICLE 19: FEDERAL COMPLIANCE
Contractor agrees to comply with all federal statutes relating to nondiscrimination, labor standards, and environmental compliance. Additionally, for work to be performed under the Agreement or subcontract thereof, including procurement of materials or leases of equipment, Contractor shall notify each potential subcontractor or supplier of the Contractor's federal compliance obligations. These may include, but are not limited to: (a) Title VI of the Civil Rights Act of 1964 (P.L. 88-352) which prohibits discrimination on the basis of race, color or national origin; (b) Title IX of the Education Amendments of 1972, as amended (20 U.S.C. §§ 1681-1683, and 1685-1686), which prohibits discrimination on the basis of sex; (c) the Fair Labor Standards Act of 1938 (29 USC 676 et. seq.), (d) Section 504 of the Rehabilitation Act of 1973, as amended (29 U.S.C. § 794), which prohibits discrimination on the basis of handicaps and the Americans with Disabilities Act of 1990; (e) the Age Discrimination in Employment Act of 1967 (29 USC 621 et. seq.) and the Age Discrimination Act of 1974, as amended (42 U.S.C. §§ 6101-6107), which prohibits discrimination on the basis of age; (f) the Drug Abuse Office and Treatment Act of 1972 (P.L. 92-255), as amended, relating to nondiscrimination on the basis of drug abuse; (g) the Comprehensive Alcohol Abuse and Alcoholism Prevention, Treatment and Rehabilitation Act of 1970 (P.L. 91-616), as amended, relating to the nondiscrimination on the basis of alcohol abuse or alcoholism; (h) §§ 523 and 527 of the Public Health Service Act of 1912 (42 U.S.C. 290 dd-3 and 290 ee- 3), as amended, relating to confidentiality of alcohol and drug abuse patient records; (i) Title VIII of the Civil Rights Act of 1968 (42 U.S.C. § 3601 et seq.), as amended, relating to nondiscrimination in the sale, rental or financing of housing; (j) any other nondiscrimination provisions in any specific statute(s)

Page 5 of 7 ends

applicable to any Federal funding for this Agreement; (k) the requirements of any other nondiscrimination statute(s) which may apply to this Agreement; (l) applicable provisions of the Clean Air Act (42 U.S.C. §7401 et seq.), the Federal Water Pollution Control Act, as amended (33 U.S.C. §1251 et seq.), Section 508 of the Clean Water Act (33 U.S.C. 1368), Executive Order 11738, and the Environmental Protection Agency regulations at 40 CPR Part 15; (m) applicable provisions of the Davis­ Bacon Act (40 U.S.C. 276a - 276a-7), the Copeland Act (40 U.S.C. 276c), and the Contract Work Hours and Safety Standards Act (40 U.S.C. 327-332), as set forth in Department of Labor Regulations at 20 CPR 5.5a; (n) the mandatory standards and policies relating to energy efficiency which are contained in the state energy conservation plan issued in compliance with the Energy Policy and Conservation Act (P.L. 94-163).

ARTICLE 20: CRIMINAL PROVISIONS AND SANCTIONS
The Contractor agrees to perform the Agreement in conformance with safeguards against fraud and abuse as set forth by the H-GAC, the State of Texas, and the acts and regulations of any related state or federal agency. The Contractor agrees to promptly notify H-GAC of any actual or suspected fraud, abuse, or other criminal activity through the filing of a written report within twenty-four (24) hours of knowledge thereof. Contractor shall notify H-GAC of any accident or incident requiring medical attention arising from its activities under this Agreement within twenty-four (24) hours of such occurrence. Theft or willful damage to property on loan to the Contractor from H-GAC, if any, shall be reported to local law enforcement agencies and H-GAC within two (2) hours of discovery of any such act.

The Contractor further agrees to cooperate fully with H-GAC, local law enforcement agencies, the State of Texas, the Federal Bureau of Investigation and any other duly authorized investigative unit, in carrying out a full investigation of all such incidents.

The Contractor shall notify H-GAC of the threat of lawsuit or of any actual suit filed against the Contractor pertaining to this Agreement or which would adversely affect the Contractor’s ability to perform services under this Agreement.

ARTICLE 21: INDEMNIFICATION AND RECOVERY
H-GAC’s liability under this Agreement, whether for breach of contract, warranty, negligence, strict liability, in tort or otherwise, is limited to its order processing charge. In no event will H-GAC be liable for any loss of use, loss of time, inconvenience, commercial loss, lost profits or savings or other incidental, special or consequential damages to the full extent such use may be disclaimed by law.

Contractor agrees, to the extent permitted by law, to defend and hold harmless H-GAC, its board members, officers, agents, officials, employees and indemnities from any and all claims, costs, expenses (including reasonable attorney fees), actions, causes of action, judgements, and liens arising as a result of Contractor’s negligent act or omission under this Agreement. Contractor shall notifiy H-GAC of the threat of lawsuit or of any actual suit filed against Contractor relating to this Agreement.

ARTICLE 22: LIMITATION OF CONTRACTOR’S LIABILITY
Except as specified in any separate writing between the Contractor and an END USER, Contractor’s total liability under this Agreement, whether for breach of contract, warranty, negligence, strict liability, in tort or otherwise, but excluding its obligation to indemnify H-GAC, is limited to the price of the particular products/services sold hereunder, and Contractor agrees either to refund the purchase price or to repair or replace product(s) that are not as warranted. In no event will Contractor be liable for any loss of use, loss of time, inconvenience, commercial loss, loss of profits or savings or other incidental, special or consequential damages to the full extent such use may be disclaimed by law.

Contractor understands and agrees that it shall be liable to repay and shall repay upon demand to

Page 6 of 7 ends

END USER any amounts determined by H-GAC, its independent auditors, or any agency of State or Federal government to have been paid in violation of the terms of this Agreement.

ARTICLE 23: TITLES NOT RESTRICTIVE
The titles assigned to the various Articles of this Agreement are for convenience only. Titles shall not be considered restrictive of the subject matter of any Article, or part of this Agreement.

ARTICLE 24: JOINT WORK PRODUCT
This Agreement is the joint work product of H-GAC and the Contractor. This Agreement has been negotiated by H-GAC and the Contractor and their respective counsel and shall be fairly interpreted in accordance with its terms and, in the event of any ambiguities, no inferences shall be drawn against any party.

ARTICLE 25: DISPUTES
All disputes concerning questions of fact or of law arising under this Agreement, which are not addressed within the Whole Agreement as defined pursuant to Article 4 hereof, shall be decided by the Executive Director of H-GAC or his designee, who shall reduce his decision to writing and provide notice thereof to the Contractor. The decision of the Executive Director or his designee shall be final and conclusive unless, within thirty (30) days from the date of receipt of such notice, the Contractor requests a rehearing from the Executive Director of H-GAC. In connection with any rehearing under this Article, the Contractor shall be afforded an opportunity to be heard and offer evidence in support of its position. The decision of the Executive Director after any such rehearing shall be final and conclusive. The Contractor may, if it elects to do so, appeal the final and conclusive decision of the Executive Director to a court of competent jurisdiction. Pending final decision of a dispute hereunder, the Contractor shall proceed diligently with the performance of the Agreement and in accordance with H­ GAC's final decision.

ARTICLE 26: CHOICE OF LAW: VENUE
This Agreement shall be governed by the laws of the State of Texas. Venue and jurisdiction of any suit or cause of action arising under or in connection with the Agreement shall lie exclusively in Harris County, Texas. Disputes between END USER and Contractor are to be resolved in accordance with the law and venue rules of the state of purchase. Contractor shall immediately notify H-GAC of such disputes.

ARTICLE 27: ORDER OF PRIORITY
In the case of any conflict between or within this Agreement, the following order of priority shall be utilized: 1) General Provisions, 2) Special Provisions, 3) Scope of Work, and, 4) Other Attachments.

Page 7 of 7 ends

SIGNATURES:

H-GAC and the Contractor have read, agreed, and executed the whole Agreement as of the date first written above, as accepted by:

_________________________

Signature $docusign:SignHere::Customer1

Name

Title

Date $docusign:DateSigned::Customer1

H-GAC

Signature $docusign:SignHere::InternalSigner

Name Chuck Wemple

Title Executive Director

Date $docusign:DateSigned::InternalSigner

H-GAC
Houston-Galveston Area Council
P.O. Box 22777 · 3555 Timmons · Houston, Texas 77227-2777 Cooperative Agreement -

Page 1 of 4 ends

SPECIAL PROVISIONS

Incorporated by attachment, as part of the whole agreement, H-GAC and the Contractor do, hereby agree to the Special Provisions as follows:

ARTICLE 1: BIDS/PROPOSALS INCORPORATED

In addition to the whole Agreement, the following documents listed in order of priority are incorporated into the Agreement by reference: Bid/Proposal Specifications and Contractor’s Response to the Bid/Proposal.

ARTICLE 2: END USER AGREEMENTS (“EUA”)

H-GAC acknowledges that the END USER may choose to enter into an End User Agreement (“EUA) with the Contractor through this Agreement, and that the term of the EUA may exceed the term of the current H-GAC Agreement. H-GAC’s acknowledgement is not an endorsement or approval of the End User Agreement’s terms and conditions. Contractor agrees not to offer, agree to or accept from the END USER, any terms or conditions that conflict with those in Contractor’s Agreement with H-GAC. Contractor affirms that termination of its Agreement with H-GAC for any reason shall not result in the termination of any underlying EUA, which shall in each instance, continue pursuant to the EUA’s stated terms and duration. Pursuant to the terms of this Agreement, termination of this Agreement will disallow the Contractor from entering into any new EUA with END USERS. Applicable H-GAC order processing charges will be due and payable to H-GAC on any EUAs, surviving termination of this Agreement between H-GAC and Contractor.

ARTICLE 3: MOST FAVORED CUSTOMER CLAUSE

Contractor shall provide its most favorable pricing and terms to H-GAC. If at any time during this Agreement, Contractor develops a regularly followed standard procedure of entering into agreements with other governmental customers within the State of Texas, and offers the same or substantially the same products/services offered to H-GAC on a basis that provides prices, warranties, benefits, and or terms more favorable than those provided to H-GAC, Contractor shall notify H-GAC within ten (10) business days thereafter, and this Agreement shall be deemed to be automatically retroactively amended, to the effective date of Contractor’s most favorable past agreement with another entity. Contractor shall provide the same prices, warranties, benefits, or terms to H-GAC and its END USER as provided in its most favorable past agreement.

H-GAC shall have the right and option at any time to decline to accept any such change, in which case the amendment shall be deemed null and void. If Contractor claims that a more favorable price, warranty, benefit, or term that was charged or offered to another entity during the term of this Agreement, does not constitute more favorable treatment, than Contractor shall, within ten (10) business days, notify H-GAC in writing, setting forth the detailed reasons Contractor believes the aforesaid offer is not in fact most favored treatment.

H-GAC, after due consideration of Contractor’s written explanation, may decline to accept such explanation and thereupon this Agreement between H-GAC and Contractor shall be automatically amended, effective retroactively, to the effective date of the most favored agreement, to provide the same prices, warranties,

Page 2 of 4 ends

benefits, or terms to H-GAC and the END USER.

EXCEPTION: This clause shall not be applicable to prices and price adjustments offered by a bidder, Proposer or contractor, which are not within bidder's/proposer’s control [example; a manufacturer's bid concession], or to any prices offered to the Federal Government and its agencies.

ARTICLE 4: PARTY LIABILITY

Contractor’s total liability under this Agreement, whether for breach of contract, warranty, negligence, strict liability, in tort or otherwise, is limited to the price of the particular products/services sold hereunder.

Contractor agrees either to refund the purchase price or to repair or replace product(s) that are not as warranted.

Contractor accepts liability to repay, and shall repay upon demand to END USER, any amounts determined by H-GAC, its independent auditors, or any state or federal agency, to have been paid in violation of the terms of this Agreement.

ARTICLE 5: GOVERNING LAW & VENUE

Contractor and H-GAC agree that Contractor will make every reasonable effort to resolve disputes the END USER in accord with the law and venue rules of the state of purchase. Contractor shall immediately notify H- GAC of such disputes.

ARTICLE 6: SALES AND ORDER PROCESSING CHARGE

Contractor shall sell its products to END USERS based on the pricing and terms of this Agreement. H-GAC will invoice Contractor for the applicable order processing charge when H-GAC receives notification of an END USER order. Contractor shall remit to H-GAC the full amount of the applicable order processing charge, after delivery of any product or service and subsequent END USER acceptance. Payment of the Order Processing Charge shall be remitted from Contractor to H-GAC, within thirty (30) calendar days or ten (10) business days after receipt of an END USER’s payment, whichever comes first, notwithstanding Contractor’s receipt of invoice. For sales made by Contractor based on this Agreement, including sales to entities without Interlocal Agreements, Contractor shall pay the applicable order processing charges to H-GAC. Further, Contractor agrees to encourage entities who are not members of H-GAC’s Cooperative Purchasing Program to execute an H-GAC Interlocal Agreement. H-GAC reserves the right to take appropriate actions including, but not limited to, Agreement termination if Contractor fails to promptly remit the appropriate order processing charge to H-GAC. In no event shall H-GAC have any liability to Contractor for any goods or services an END USER procures from Contractor. At all times, Contractor shall remain liable to pay to H-GAC any order processing charges on any portion of the Agreement actually performed, and for which compensation was received by Contractor.

ARTICLE 7: LIQUIDATED DAMAGES

Contractor and H-GAC agree that Contractor shall cooperate with the END USER at the time an END USER purchase order is placed, to determine terms for any liquidated damages.

ARTICLE 8: INSURANCE

Unless otherwise stipulated in Section B of the Bid/Proposal Specifications, Contractor must have the following insurance and coverage minimums:
a. General liability insurance with a Single Occurrence limit of at least $1,000,000.00, and a General

Page 3 of 4 ends

Aggregate limit of at least two times the Single Occurrence limit.

Product liability insurance with a Single Occurrence limit of at least $1,000,000.00, and a General Aggregate limit of at least two times the Single Occurrence limit for all Products except Automotive Fire Apparatus. For Automotive Fire Apparatus, see Section B of the Bid/Proposal Specifications.

Property Damage or Destruction insurance is required for coverage of End User owned equipment while in Contractor's possession, custody or control. The minimum Single Occurrence limit is $500,000.00 and the General Aggregate limit must be at least two times the Single Occurrence limit. This insurance may be carried in several ways, e.g. under an Inland Marine policy, as art of Automobile coverage, or under a Garage Keepers policy. In any event, this coverage must be specifically and clearly listed on insurance certificate(s) submitted to H-GAC. b. Insurance coverage shall be in effect for the length of any contract made pursuant to the Bid/Proposal, and for any extensions thereof, plus the number of days/months required to deliver any outstanding order after the close of the contract period.
c. Original Insurance Certificates must be furnished to H-GAC on request, showing Contractor as the insured and showing coverage and limits for the insurances listed above. d. If any Product(s) or Service(s) will be provided by parties other than Contractor, all such parties are required to carry the minimum insurance coverages specified herein, and if requested by H-GAC, a separate insurance certificate must be submitted for each such party. e. H-GAC reserves the right to contact insurance underwriters to confirm policy and certificate issuance and document accuracy.

ARTICLE 9: PERFORMANCE AND PAYMENT BONDS FOR INDIVIDUAL ORDERS

H-GAC’s contractual requirements DO NOT include a Performance & Payment Bond (PPB); therefore, Contractor shall offer pricing that reflects this cost savings. Contractor shall remain prepared to offer a PPB to cover any order if so requested by the END USER. Contractor shall quote a price to END USER for provision of any requested PPB, and agrees to furnish the PPB within ten business (10) days of receipt of END USER's purchase order.

ARTICLE 10: CHANGE OF STATUS

Contractor shall immediately notify H-GAC, in writing, of ANY change in ownership, control, dealership/franchisee status, Motor Vehicle license status, or name. Contractor shall offer written guidance to advise H-GAC if this Agreement shall be affected in any way by such change. H-GAC shall have the right to determine whether or not such change is acceptable, and to determine what action shall be warranted, up to and including cancellation of Agreement.

ARTICLE 11: TEXAS MOTOR VEHICLE BOARD LICENSING

All that deal in motor vehicles shall maintain current licenses that are required by the Texas Motor Vehicle Commission Code. If at any time during this Agreement term, any required Contractor license is denied, revoked, or not renewed, Contractor shall be in default of this Agreement, unless the Texas Motor Vehicle

Page 4 of 4 ends

Board issues a stay or waiver. Contractor shall promptly provide copies of all current applicable Texas Motor Vehicle Board documentation to H-GAC upon request.

Revised 11/30/2015Form provided by Texas Ethics Commission www.ethics.st ate.tx.us

FORM CIQ
OFFICE USE ONLYThis questionnaire reflects changes made to the law by H.B. 23, 84th Leg., Regular Session.

This questionnaire is being filed in accordance with Chapter 176, Local Government Code, by a vendor who has a business relationship as defined by Section 176.001(1-a) with a local governmental entity and the vendor meets requirements under Section 176.006(a).

By law this questionnaire must be filed with the records administrator of the local governmental entity not later than the 7th business day after the date the vendor becomes aware of facts that require the statement to be filed. See Section 176.006(a-1), Local Government Code.

A vendor commits an offense if the vendor knowingly violates Section 176.006, Local Government Code. An offense under this section is a misdemeanor .

CONFLICT OF INTEREST QUESTIONNAIRE
For vendor doing business with local governmental entity Date Received
A. Is the local government officer or a family member of the officer receiving or likely to receive taxable income, other than investment income, from the vendor?

Yes No
B. Is the vendor receiving or likely to receive taxable income, other than investment income, from or at the direction of the local government of ficer or a family member of the of ficer AND the taxable income is not received from the local governmental entity?

Yes No
7 Check this box if the vendor has given the local government officer or a family member of the officer one or more gifts as described in Section 176.003(a)(2)(B), excluding gifts described in Section 176.003(a-1).

Signature of vendor doing business with the governmental entity Date
Name of vendor who has a business relationship with local governmental entity.1 Check this box if you are filing an update to a previously filed questionnaire. (The law requires that you file an updated completed questionnaire with the appropriate filing authority not later than the 7th business day after the date on which you became aware that the originally filed questionnaire was incomplete or inaccurate.) 2 3 Name of local government officer about whom the information is being disclosed.

Name of Officer
Describe each employment or other business relationship with the local government officer , or a family member of the officer, as described by Section 176.003(a)(2)(A). Also describe any family relationship with the local government officer.

Complete subparts A and B for each employment or business relationship described. Attach additional pages to this Form CIQ as necessary.
4 6
5 Describe each employment or business relationship that the vendor named in Section 1 maintains with a corporation or other business entity with respect to which the local government officer serves as an officer or director , or holds an ownership interest of one percent or more.

Revised 11/30/2015Form provided by Texas Ethics Commission www.ethics.st ate.tx.us

CONFLICT OF INTEREST QUESTIONNAIRE
For vendor doing business with local governmental entity A complete copy of Chapter 176 of the Local Government Code may be found at http://www.statutes.legis.state.tx.us/ Docs/LG/htm/LG.176.htm. For easy reference, below are some of the sections cited on this form.

Local Government Code § 176.001(1-a): "Business relationship" means a connection between two or more parties based on commercial activity of one of the parties. The term does not include a connection based on:
(A) a transaction that is subject to rate or fee regulation by a federal, state, or local governmental entity or an agency of a federal, state, or local governmental entity; (B) a transaction conducted at a price and subject to terms available to the public; or (C) a purchase or lease of goods or services from a person that is chartered by a state or federal agency and that is subject to regular examination by, and reporting to, that agency.

Local Government Code § 176.003(a)(2)(A) and (B):
(a) A local government officer shall file a conflicts disclosure statement with respect to a vendor if:
***
(2) the vendor:
(A) has an employment or other business relationship with the local government officer or a family member of the officer that results in the officer or family member receiving taxable income, other than investment income, that exceeds $2,500 during the 12-month period preceding the date that the officer becomes aware that
(i) a contract between the local governmental entity and vendor has been executed; or
(ii) the local governmental entity is considering entering into a contract with the vendor;
(B) has given to the local government officer or a family member of the officer one or more gifts that have an aggregate value of more than $100 in the 12-month period preceding the date the officer becomes aware that:
(i) a contract between the local governmental entity and vendor has been executed; or (ii) the local governmental entity is considering entering into a contract with the vendor.

Local Government Code § 176.006(a) and (a-1)
(a) A vendor shall file a completed conflict of interest questionnaire if the vendor has a business relationship with a local governmental entity and:
(1) has an employment or other business relationship with a local government officer of that local governmental entity, or a family member of the officer, described by Section 176.003(a)(2)(A); (2) has given a local government officer of that local governmental entity, or a family member of the officer, one or more gifts with the aggregate value specified by Section 176.003(a)(2)(B), excluding any gift described by Section 176.003(a-1); or
(3) has a family relationship with a local government officer of that local governmental entity. (a-1) The completed conflict of interest questionnaire must be filed with the appropriate records administrator not later than the seventh business day after the later of:
(1) the date that the vendor:
(A) begins discussions or negotiations to enter into a contract with the local governmental entity; or
(B) submits to the local governmental entity an application, response to a request for proposals or bids, correspondence, or another writing related to a potential contract with the local governmental entity; or
(2) the date the vendor becomes aware:
(A) of an employment or other business relationship with a local government of ficer, or a family member of the officer, described by Subsection (a); (B) that the vendor has given one or more gifts described by Subsection (a); or (C) of a family relationship with a local government officer.

House Bill 89 Verification Form

Prohibition on Contracts with Companies Boycotting Israel The 85th Texas Legislature approved new legislation, effective Sept. 1, 2017, which amends Texas Local Government Code Section 1. Subtitle F, Title 10, Government Code by adding Chapter 2270 which states that a governmental entity may not enter into a contract with a company for goods or services unless the contract contains a written verification from the company that it:
1) does not boycott Israel; and
2) will not boycott Israel during the term of the contract Pursuant to Section 2270.001, Texas Government Code:

1. “Boycott Israel” means refusing to deal with, terminating bu siness activities with, or otherwise taking any action that is intended to penalize, inflict economic harm on, or limit commercial relations specifically with Israel, or with a person or entity doing busi ness in Israel or in an Israeli-controlled territory, but does not include an action made for ordinary business purposes; and

2. “Company” means a for-profit so le proprietorship, organizati on, association, corporation, partnership, joint venture, limited partnership, limited liabil ity partnership, or any limited liability company, including a wholly owned subsidiary, majority-owned su bsidiary, parent company or affiliate of those entities or business associations that exist to make a profit.

I, (authorized official) _________________________________, do hereby depose and verify the truthfulness and accuracy of the contents of the statements sub mitted on this certification under the provisions of Subtitle F, Title 10, Government Code Chapter 2270 and that the company named below:
1) does not boycott Israel currently; and
2) will not boycott Israel during the term of the contract; and 3) is not currently listed on the S tate of Texas Comptroller’s Com panies that Boycott Israel List located at https://comptroller.texas.gov/purchasing/publications/divestment.php

______________________________________________________________________________ Company Name
______________________________________________________________________________ Signature of Authorized Official
______________________________________________________________________________ Title of Authorized Official D a t e

CONTRACTOR: CONTRACT #:

Purchase Order Address: Invoice Address:

Contact Name: Contact Name:

Address: Address:

City State Zip Code City State Zip Code Telephone No.: Telephone No.#
Fax No.# Fax No.#
Email Address: Email Address:

CONTRACT INFORMATION:

Printed Name of Signatory: Printed Name of Signatory:

Corporate Title: Corporate Title:

Tel. No.: Tel. No.:

Fax No.: Fax No.:

Email Address: Email Address:

SALES CONTACT INFORMATION
Contact Name: Title:

Address:

Street City State Zip
Telephone No.: Fax No.:

Mobile No.: (optional)
Email Address:

CONTRACTOR CONTACT INFORMATION
Section II
ATTENTION Houston-Galveston Area Council (H-GAC) Contractor:The following information is needed to communicate with your company concerning contract matters which may arise.To expedite the process, we ask that you provide the information requested below. During the term of this contract, notify H-GAC in writing of any changes to this information by emailing updates to: [email protected]
Section I
Indicate the person (s) authorized to sign contracts, requests for contract price increases, or other contract-related documents. A copy of your corporate resolution may be acceptable for Section II.

Section III
Person who End Users will contact for product information and pricing quotes

← All documents from this meeting