Cities Index.
Agenda packet

Salinas City Council
August 4, 2026

Document
Agenda packet
Meeting
August 4, 2026
Body
Salinas City Council
Pages
17
Original file
138.7 MB
Text extracted from the city's file for reading and search. Open the original on salinas.legistar.com. That file is the official record.

8. Submittals: We have budgeted to provide one (1) formal submittal package to the Architect for initial submittal to the City and up to two (2) resubmittals to address City comments that do not result in a change to the site plan. We have not included a separate submittal to Cal Water in this scope because they typically do not require us to submit plans during entitlements. If a separate submittal to Cal Water is required, BKF can provide that as an additional service.

SCOPE QUALIFICATIONS AND ASSUMPTIONS
BKF Engineers' services are limited to those expressly set forth in the scope. We understand that BKF will have no other obligations or responsibilities for the project except as provided in this proposal letter, or as otherwise agreed to in writing. BKF will provide the scope of services consistent with, and limited to, the standard of care applicable to such services. Any participation in non-adversarial procedures, or other right to repair items, is considered as additional services. For the scope of work identified, we have assumed the following:
1) Basis of Design and Site Information
a) Topographic Survey: A current design topographic base map at a scale of 1" =20' using ground surveying methods will be provided prior to the start of design. This survey will include the location, rim, and invert of gravity utilities and location only 'dry' utilities within the project area along with evidence of other buried utilities. Please refer to the separate survey proposal dated October 28, 2024 for topographic surveying services at the 37 Soledad Street site.
b) Title Report: A current title report for the property will be provided by the owner. c) Geotechnical Report: A geotechnical report for the project will be provided. At a minimum, this report should address the required paving structural sections, earthwork and compaction recommendations, soil bearing pressures, surcharge pressures, settlement issues, soil infiltration/percolation rates, groundwater levels, and corrosion recommendations.
d) Existing Utilities: Unless otherwise indicated or provided by others, any existing utilities identified on BKF's drawings/plans are based on information obtained by BKF, or provided to BKF, and may not be accurately documented in their horizontal location or vertical profile. Other utilities may be present that were not disclosed. BKF highly recommends that critical facilities be underground service alert (USA) located and potholed during design or prior to construction.
e) Potholing: Potholing services are not included in this proposal unless specifically identified. f) Existing Utility Capacities: Unless otherwise addressed, existing utilities have adequate capacity to serve the proposed improvements, that they are adjacent to the site frontage and do not require main extensions, and that utility system capacity studies are not required.
2) Responsibilities
a) Civil Engineering Scope Items: BKF's design tasks are limited to civil work outside of the structure(s) and utility connections 5-feet outside of the structure(s) including: site grading, non-structural concrete pavement, concrete sidewalks, concrete curbs and gutters, asphalt pavement, storm drainage, wastewater, and domestic water/fire water design. BKF will provide horizontal control for the building location relative to the project boundary.
b) Architect: The Architect will be responsible for the overall site plan including accessible routes of travel, details of site accessibility signage, parking counts, site coverage calculations, trash areas/enclosures, fencing and walls. A site plan will be provided by the Architect prior to our beginning the DD phase. All work within the building (including any podium, porches, garages, or ramps) will be the Architect's scope of work.

Docusign Envelope ID: 8FC79C5B-22E9-486D-B4BE-E4D2DCA9E299 171 998

Page 4 of 7 ends

c) Site Dry Utilities: All electric, gas, communications, and lighting improvements will be designed by others, unless specifically included in the civil scope of work. d) Fire System: Certification of the fire protection system from the point of connection at the public water main to the building sprinkler system must be provided by a properly-licensed fire protection engineer or contractor.
e) Site Landscape/Irrigation: The landscape architect will provide landscape, irrigation design, and layout and details of walks, plazas, trails, entry monuments, walls, and/or fences. The architect and landscape architect will lead the design development efforts for the design, grading, and detailing of interior courtyards, plaza areas, hardscape and landscape areas.
f) Structural Details: Structural calculations, design, and details for such items as reinforced concrete slabs, foundations, pads, vaults, footings, ramps, stairs, sound/site walls, and/or retaining walls will be provided by others. This includes structural design and detailing for storm water treatment elements that retain ground, parking, or buildings foundations.
g) Mechanical, Electrical and Plumbing (MEP): All site HVAC, power, gas, communications, and low voltage improvements, and existing water pressures will be coordinated, designed, and documented by others. MEP will also provide preliminary fire service sizing based on the California Plumbing and Fire Code requirements and provide fire service lateral locations and sizes to BKF. h) Joint Trench Design: Services to the buildings, main extensions, and/or relocation of existing 'dry' utilities (gas, electric, communication, fiber, etc.) will be led by the joint trench/electrical designers unless otherwise contracted. Any utility relocation/abandonment required is assumed to be coordinated and processed by the Joint Trench Consultant. Dry utilities designed by the joint trench consultant will be shown for coordination purposes only on the civil plans.
i) Lighting Design & Photometric Analysis: Lighting design and photometric analysis for the site and public roadways will be provided by others.
j) Traffic Signal Design: Design or modification of traffic signals is not currently included in our scope of work.

BKF can provide these services if the City conditions these improvements to the project. k) Water Design: Proposal assumes that the project will require new water services for domestic, irrigation, and fire. We have not allocated budget to install public or private fire loops within the development or main extensions within the public right of way.
l) Mapping: We have not included time to prepare additional items not contained in the mapping scope of work. Additional mapping services such as subdivision maps, private easement documents, quit claims, ALTA's, right of way dedications, etc. not specifically listed in this proposal are not included. m) Cost Estimating: All cost estimating will be provided by a project estimator. BKF will review the cost estimates for general consistency with the plans.
n) Pump Stations: Pump station design (electrical, mechanical, plumbing, and sitework) is not included in the basic scope of services. We can provide pump station design service as an additional scope item at your request.
o) Earthwork: Due to the variability in soils properties, existing site conditions, foundation types and preparation, trench, imported material and other factors, no delineation of earthwork quantities or 'site balance' is implied with the scope of work. Any earthwork quantities generated are solely for bonding and Docusign Envelope ID: 8FC79C5B-22E9-486D-B4BE-E4D2DCA9E299 172 999

Page 5 of 7 ends

permitting of the work with the local agency and must only be used as an approximate guide as to the actual earthwork and site balance.
3) CEQA, Entitlement, and Off-Site Improvements/Studies a) CEQA/EIR Consulting: Some jurisdictions allow project sponsors to provide technical studies to support the CEQA document and review by the sponsor of the administrative draft document. We have not included time for assisting in this effort. Should this be requested, we can provide a separate scope to support this effort. b) Conditions of Approval: The proposal is based solely on the concept site plans provided by the project architect prior to the issuance of the Project Conditions of Approval. Once available, BKF will review the project conditions and identify any that require services not contained without our base proposal along with a fee required to provide those additional services
c) Off-Site Improvements: Off-site improvements are limited to designing new curb cuts along the project frontage and construction of new curb, gutter, sidewalk, and utility services to the public mains within the fronting public roads. If additional off-site improvements are subsequently required as a result of the planning entitlement or permitting process, we will notify you of the change in scope and provide an additional service request to cover the new scope. We have assumed that the minimal public improvements currently anticipated to support this development can be design and documented with the on-site improvement plans. 4) Meetings
Meetings: Meetings are assumed to be held in the Bay Area or via remote conference. Meeting time requested beyond what we have budgeted is not included in this proposal. 5) Phasing, Delivery and Deliverables
a) Phasing: The project will be permitted and constructed in one phase and that construction phasing plan(s), or interim condition plans, will not be required for this project. Proposal does not include preparing and processing split construction permits for demolition, rough grading, backbone utilities, etc. b) Submittals: All submittals, and the coordination thereof, will be facilitated by the lead consultant and /or owner representative.

c) Permits: Unless otherwise specifically delineated in the scope of services, permit processing, applications, fees, and submittals to local, state, and federal agencies and utility purveyors will be provided by others. BKF will submit to the client delineated scope deliverables for client submission to governing agencies. d) Drawings: All drawings will be prepared in AutoCAD format. We will submit copies of all drawings in both electronic and paper format.
e) Building Information Modeling (BIM): We have not included time to convert civil 3D design or existing conditions AutoCAD files into BIM model files. We have assumed all conversions will be by the Architect.

Docusign Envelope ID: 8FC79C5B-22E9-486D-B4BE-E4D2DCA9E299 1000 173

Page 6 of 7 ends

COMPENSATION
BKF proposes to provide the services on a lump sum basis. We will invoice for our services on a percent complete basis per task summarized as follows:

Task Description Fee
1 Schematic Design/Entitlements Documents and Support $ 15,400 Reimbursable expenses are anticipated for reproduction, mileage, express and messenger deliveries, and computer deliverable plots. Reimbursable expenses will be billed on a cost plus 10-percent markup basis.

For tasks requested by the owner or Architect not defined in this scope of services, BKF will identify them as potential extra work. We can provide a scope and fee for these items or they may be tracked separately as extra work and billed on a time and materials per our attached rate schedule.

Thank you for the opportunity to present this proposal. We look forward to assisting in developing this project. Please contact me at 650-482-6475 if you have any questions regarding our scope of services.

Respectfully,
BKF Engineers
Craig Smith, PE, QSD Jonathan Tang, PE
Project Manager Associate Principal
Docusign Envelope ID: 8FC79C5B-22E9-486D-B4BE-E4D2DCA9E299 1001 174

Page 7 of 7 ends

BKF ENGINEERS PROFESSIONAL SERVICES RATE SCHEDULE
EFFECTIVE JANUARY 1, 2025

CLASSIFICATION HOURLY RATE

PROJECT MANAGEMENT
Principal in Charge $317.00
Senior Project Executive $294.00
Project Executive $287.00
Senior Project Manager | Senior Technical Manager $278.00 Project Manager | Technical Manager $273.00
Engineering Manager | Surveying Manager | Planning Manager $251.00

TECHNICAL STAFF
Senior Project Engineer | Senior Project Surveyor | Senior Project Planner $233.00 Project Engineer | Project Surveyor | Project Planner $205.00 Design Engineer | Staff Surveyor | Staff Planner $179.00 BIM Specialist I, II, III $179.00 - $205.00 - $233.00
Technician I, II, III, IV, V $ $170.00 - $181.00 - $198.00 - $213.00 - $230.00 Drafter I, II, III, IV $133.00 - $146.00 - $158.00 - $175.00 Engineering Assistant | Surveying Assistant | Planning Assistant $111.00

FIELD SURVEYING
Survey Party Chief $233.00
Instrument Person $200.00
Survey Chainperson $150.00
Utility Locator I, II, III, IV $122.00 - $172.00 - $207.00 - $235.00 Apprentice I, II, III, IV $92.00 - $124.00 - $137.00 - $145.00

CONSTRUCTION ADMINISTRATION
Senior Consultant $305.00
Senior Construction Administrator $266.00
Resident Engineer $197.00
Field Engineer I, II, III, IV $179.00 - $205.00 - $233.00 - $250.00

FUNDING & GRANT MANAGEMENT
Director of Funding Strategies $218.00
Funding Strategies Manager $200.00
Funding/Research Analyst I, II, III, IV $137.00 - $158.00 - $168.00 - $185.00

PROJECT ADMINISTRATION
Project Coordinator $149.00
Senior Project Assistant $128.00
Project Assistant $113.00
Clerical | Administrative Assistant $95.00
Expert witness rates are available upon request.

Subject to the terms of a services agreement:
• Charges for outside services, equipment, materials, and facilities not furnished directly by BKF Engineers will be billed as reimbursable expenses at cost plus 10%. Such charges may include, but shall not be limited to: printing and reproduction services; shipping, delivery, and courier charges; subconsultant fees and expenses; agency fees; insurance; transportation on public carriers; meals and lodging; and consumable materials. • Allowable mileage will be charged at the prevailing IRS rate per mile. • Monthly invoices are due within 30 days from invoice date. Interest will be charged at 1.5% per month on past due accounts.
• The rates shown are subject to periodic increases, including January 1st of each year.

Docusign Envelope ID: 8FC79C5B-22E9-486D-B4BE-E4D2DCA9E299 1002 175
April 1, 2025
Lindsey Moder
TEF Design
1420 Sutter Street
San Francisco, CA 94109
Re: Soledad Street Properties - Entitlements Consulting 40 Soledad Street
Salinas, CA 93901
Job No. 2025.083.00
Dear Lindsey,
We are pleased to submit this proposal to provide structural consultation services for the Soledad Street project in Salinas; thank you for considering Tipping for your team. This proposal is intended to support the entitlement and project planning process currently underway. We are basing this proposal on our discussions with you and your request for a proposal emailed on March 27, 2025, which included conceptual renderings of the proposed project.

We understand that the current phase of the project, covered by this proposal, will develop the plans to a schematic level for 3 separate buildings located on existing parcels at 34-40 Soledad Street, 45 Soledad Street and 37 Soledad Street. We understand that two separate entitlements packages will be submitted for approvals. Package 1 will include the work at 37 Soledad Street. Package 2 will include the work at 34-40 Soledad Street and 45 Soledad Street.

The proposed plans envision the following scope for the various properties:
• 37 Soledad Street: This is the site of the former Republic Cafe. We have proposed to perform a Historic Structures Report (HSR) as part of a separate agreement with your office. This proposal assumes that the work for the HSR and schematic entitlements design will be distinct and separate scopes under different agreements. The fees associated with this proposal assume that the HSR work under a separate agreement will proceed concurrently. The proposed plans call for the rehabilitation of the existing two-story, wood-framed building, with a possible horizontal or vertical addition to create a mixed-use structure housing a local museum with affordable housing. Our work will be to outline the structural interventions needed to stabilize, seismically strengthen, and reinforce the building frame and foundations to support the new addition.

Docusign Envelope ID: 8FC79C5B-22E9-486D-B4BE-E4D2DCA9E299 1003 176
Soledad Street Properties - Entitlements Consulting April 1, 2025 • 34-40 Soledad Street: This portion of the project includes 4 parcels that were previously combined to make one. There is a historically significant building on one of these parcels that will be maintained and rehabilitated with additions around and above it for affordable housing (a new 5 story, podium-type multifamily structure). Our work during this phase will focus on the existing structure (at 38 Soledad) and modifications required to rehabilitate and integrate it with the planned new housing structure. We may provide limited consulting related to the proposed structural assemblies envisioned for the new building, but we understand that significant structural input is not required during this phase of the project for propsed new construction.
• 45 Soledad Street: This portion of the project is located on a corner lot that is currently cleared.

The proposed plans call for a new building that is meant to approximate a previous two story building that existed on this site - with an additional 1 to 3 stories above planned as affordable housing. Our work for this project will be limited to preliminary advice on framing assemblies, foundation considerations, and column grid coordination between the lower and upper structure (which is envisioned to have a setback).

As part of this effort, we will advise on design strategies and structural assemblies, and respond to questions regarding constructibility, cost, and permitting considerations. We will coordinate design concepts with the architectural program and make recommendations as appropriate. We will meet with the design team, as may be necessary, to review and discuss design options and considerations. If geotechnical recommendations are available, we will advise on alternative foundation systems and site considerations. We will make verbal and written recommendations, and provide redline markups or diagrammatic structural sketches, and we will provide a structural narrative if requested. We will not be providing a set of drawings.

We propose to provide basic structural engineering services for the above work for the sum of $24,500.00, excluding reimbursable expenses. The work will be done in accordance with the enclosed General Conditions. We estimate our fee will be broken down by work on the various properties as follows:

Property Estimated Fee
37 Soledad $8,500.00
34-40 Soledad $12,500.00
45 Soledad $3,500.00
$24,500.00
2 of 5
Docusign Envelope ID: 8FC79C5B-22E9-486D-B4BE-E4D2DCA9E299 1004 177
Soledad Street Properties - Entitlements Consulting April 1, 2025 If you find this proposal acceptable, please sign and return a copy as our authorization to proceed.

Please call if you have any questions.

Sincerely, Accepted:
______________________________________________
Signature
______________________________________________
Marc Steyer, SE, LEED AP Printed Name and Title
Principal
______________________________________________
Date
25083.wa.odt
3 of 5
Docusign Envelope ID: 8FC79C5B-22E9-486D-B4BE-E4D2DCA9E299 1005 178
MEP Engineering | Fire/Life Safety | Lighting Design | Energy Consulting | Building Technologies | Commissioning Interface Engineering Inc
1999 Harrison Street, Suite 550
Oakland, CA 94612
TEL 415.489.7240
www.interfaceengineering.com
April 2, 2025
Lindsey Moder
TEF Design
1420 Sutter Street, 2nd Floor
San Francisco, CA 94109
Re: 39 Soledad Street and 34-40/45 Soledad Street Entitlements Professional Services Proposal
Dear Lindsey:

Thank you for the opportunity to provide you with our proposal for the 39 Soledad Street and 34-40/45 Soledad Street Entitlements project.

This proposal is based on our Standard Provisions of Agreement for Professional Services, which is attached and incorporated by this reference.

PROJECT DESCRIPTION
Project Owner
City of Salinas
Project Location
39 Soledad Street and 34-40/45 Soledad Street
Salinas, CA 93901
Project Description
The scope of this project is to provide Mechanical, Electrical, Plumbing, and Fire Protection consulting services for the entitlements phase for various properties on Soledad Street. Interface will provide guidance for spatial requirements for housing systems and input on utility service sizes and POCs. We will also respond to comments on the entitlements set as required. There will be two packages:

Package One: 34-40 and 45 Soledad Streets
The City would like to package these two sites together to make the project more enticing for a developer.
34-40 Soledad includes 4 parcels that were previously combined to make one. There is a historically significant building on one of these parcels that will be maintained and rehabilitated with additions around and above it for affordable housing.
45 Soledad is a corner lot. The proposed project is meant to approximate a previous building that existed on this site - with an addition above, also for affordable housing.

Package Two: 37 Soledad Street
This is the site of a National Register listed historic building called the Republic Cafe. The building will be rehabilitated and an addition / stories above will be added to create a local museum with affordable housing above.

Docusign Envelope ID: 8FC79C5B-22E9-486D-B4BE-E4D2DCA9E299 1006 179
Interface Engineering Inc
39 Soledad Street and 34-40/45 Soledad Street Entitlements April 2, 2025
Professional Services Proposal

Page 2 ends

Sustainable Design Requirements
Project is not anticipated to pursue LEED® certification or any other third-party green building certifications/incentive programs. We will include energy efficiency designs where feasible and cost effective.

INFORMATION SOURCE
Based on RFP/email from Lindsey Moder dated March 27, 2025.

ASSUMPTIONS
Based on information received, we understand that this project:
• Packages will be designed and permitted concurrently. • Project will not be a high rise.
• Project will not be a LEED® project.
• Project Funding: We have assumed and understand that funding for this project has been secured or will be in place when project design starts. We have not assumed that payment for services will be held or delayed due to any funding delays or issues.

PROJECT SCHEDULE
• Entitlements: Approximately 3 months.

Note: Dates listed above are approximate based on information provided. However, substantial changes to the schedule above, and start/stops to project progress may result in additional services and fees.

MEETINGS AND DESIGN SITE VISITS
Up to four virtual meetings and conference calls.

DESIGN SUBMITTALS
Entitlements Package (MEPF Space Matrix, Utility Service Markups)

CONSTRUCTION COSTS
Total Construction Cost is undisclosed.

EXCLUSIONS AND CLARIFICATIONS

1. Design drawings are not included. Interface will provide a Space Matrix in Excel format and PDF markups.

2. Stamping/sealing of design documents by registered engineer are not included.

3. Construction cost estimates will be by construction cost estimator. We will review cost estimator’s pricing and provide comments.

4. Life cycle cost analysis for mechanical/electrical systems are not included.

5. Energy modeling is not included.

6. Energy code check of envelope, mechanical, and lighting systems are not included.

7. Investigative site visits are not included.

8. Work associated with public street lighting or power design is not included.

9. Project related services associated with LEED and/or other third-party Green Building Certification.

10. Project related services associated with utility incentives, including energy modeling for custom track incentives, charrettes and incentive documentation are not included.

Docusign Envelope ID: 8FC79C5B-22E9-486D-B4BE-E4D2DCA9E299 1007 180
Interface Engineering Inc
39 Soledad Street and 34-40/45 Soledad Street Entitlements April 2, 2025
Professional Services Proposal

Page 3 ends

FEE
Fixed Fee
Project Phase
Mechanical
Engineering
Electrical
Engineering
Fire/Life
Safety Phase Totals
Entitlements Phase $5,000 $3,500 $1,000 $9,500
Total Fee: $9,500
*Plus reimbursable expenses noted below.

PAYMENT TERMS
Standard reimbursable expenses include, but are not limited to: final plots, project mileage to jobsite or meeting locations, parking, shipping, and messenger services.

Billed in addition to the above fee at cost plus 10 percent processing fee.

We will bill fees and reimbursable expenses monthly as services are performed. Payment is due within 60 days of receipt of invoice. Finance charges may be added after that time at a rate of 1.5 percent per month (annual rate of 18 percent). Finance charges will be applied to delayed payments resulting from lack of project funding. Upon aging of fees and reimbursable expenses beyond 90 days, Interface reserves the right to meet with Architect and holder of Prime Contract to determine resolution prior to continuation of services.

This proposal is valid for 90 days from the date first written above. Interface Engineering Inc (Interface) reserves the right to modify or update this proposal after that date.

ADDITIONAL SERVICES
Services requested beyond those included in this proposal will be considered extra services and will be billed either at hourly rates listed below or will be estimated on a lump sum basis. Interface may decline to perform additional work until authorization is received in writing.

Additional services will be billed at our standard hourly rates at the time the work is performed*. Our current standard hourly rates (2025) are:

Senior Principal: $375/Hour
Principal: $325/Hour
Associate Principal: $275/Hour
Associate/Project Manager: $260/Hour
Sr. Engineer-Designer: $230/Hour
Engineer-Designer: $185/Hour
Project Designer-Drafter: $165/Hour
Administrative: $135/Hour
*Annual rate changes are expected to be 4% per year.

Docusign Envelope ID: 8FC79C5B-22E9-486D-B4BE-E4D2DCA9E299 1008 181
Interface Engineering Inc
39 Soledad Street and 34-40/45 Soledad Street Entitlements April 2, 2025
Professional Services Proposal

Page 4 ends

DESIGN-BUILD SERVICES
If design-build services are provided, Client acknowledges that Interface will provide performance specifications. In the event that drawings are provided, they will be conceptual drawings only. Conceptual drawings and performance specifications are intended as guidelines for the design of system(s) by the design-build contractor. Conceptual drawings and performance specifications are not intended for use to obtain a building permit or as bid documents. The design-build contractor is responsible for complete design, engineering, permit documents, construction documents, and coordination with architectural, all trades and utilities, and governing jurisdictions and licensing agencies. The design-build contractor is responsible for system quantities, capacities, routing, and installation adequate for its intended use. All detailing by design builder. Client agrees that Interface is not responsible for the design and will indemnify and hold harmless Interface for any and all claims, damages, allegations, and costs, including attorneys' fees at trial, arbitration and on appeal, arising out of the design and installation of design-build systems.

Client acknowledges that Interface's review of submittals by design-build contractor is for the limited purpose of checking for conformance with the performance concept expressed in the contract documents. Interface's review does not constitute approval of safety precautions, means and methods, approval of an assembly, or approval of a component.

Attached is our Standard Provisions of Agreement for Professional Services. If this Proposal and the Standard Provisions of Agreement meet with your approval, please sign below, initial the Standard Provisions, and return to us. By your signature, you acknowledge that you have read the Standard Provisions of Agreement and that you read and agree to the Limitation of Liability paragraph. We will not proceed with the work until this signed Agreement is returned to us. In addition, you represent that you have authority to bind TEF Design. If you have modified this proposal, we will review your modifications.

This Agreement shall not be in effect until we sign, accepting your modifications.

If you have any questions, please contact this office.

Sincerely,
Wesley Lau, PE, LEED AP Hormoz Janssens, PE, LEED AP
Principal Managing Principal
Enclosures: Standard Provisions
COMPANY: TEF Design
CONTACT: _____________________________________ ______________________________ Lindsey Moder, AIA, Associate Date
L:\Opportunities\2025\TEF Design\39 Soledad Street and 34-40_45 Soledad Street Entitlements\Fee Proposal\20250403FP - 39 Soledad Street and 34-40-45 Soledad Street Entitlements.docx Docusign Envelope ID: 8FC79C5B-22E9-486D-B4BE-E4D2DCA9E299 1009 182
p. 1
October 29, 2024, Revised June 10, 2025
Grant Leonard
City of Salinas
Planning Manager, Community Development Department
65 West Alisal Street, 2nd Floor
Salinas, CA 93901
[email protected]
Re: 37 Soledad Street/Republic Cafe - Historic Structures Report, Structural Upgrades and Building Shell Improvements
Dear Grant,
Thank you for this opportunity for TEF Architecture & Interior Design, Inc. (TEF, TEF Design or Design Team) to submit our proposal for architectural design and historic preservation services for improvements to the historic Republic Cafe, located at 37 Soledad Street in Salinas’ Chinatown. The overall intent of the project is to establish the building’s historic significance and integrity through the preparation of a Historic Structure Report, to understand the financial feasibility of using the property for mixed use and residential uses, and to complete structural upgrades and building shell improvements in order to bring the building to a stable and watertight condition. We understand that this project is categorized as an emergency stabilization and will be exempted from NEPA review requirements prior to the initiation of the project.

DESCRIPTION of SCOPE
The Republic Cafe was designed and constructed in 1942 and owned by the prominent local Salias Chinatown family of Wallace Ahtye. The building played an important part in the development and business district of Salinas’ Chinatown, was listed in the National Register of Historic Places in 2011, and is a State and local landmark. The City of Salinas Community Development Department has recently purchased the building.

Given the extensive disrepair and extreme structural degradation of the building, the City has asked TEF to prepare a Historic Structure Report (HSR). For this effort, TEF will serve as the historical architect and lead the evaluation and report effort. We have invited Gretchen Boyce, architectural historian from Groundwork Planning (GP) and Marc Steyer, Structural Engineer from Tipping Engineers, Inc. to join our team. With limited, specific scopes, these consultants will provide a thorough building evaluation.

The primary focus of this project will be emergency stabilization structural upgrades and repairs to the building shell. Note that a full rehabilitation of the building exterior will occur at a future design phase. The intent of this phase as it pertains to the historical integrity of the building is to secure historic components to the building and to prevent their further degradation.

The base scope of work includes structural upgrades to the historic, two-story, reinforced concrete building. Additional shell improvements will be required to bring the building to a watertight and secure condition, including but not limited to:
● Select minimal demolition (including architectural, structural, plumbing, mechanical and electrical systems) to complete structural upgrades and to ensure safety on site during construction; ● Full roof replacement, including repair or replacement of roof drainage components; ● Temporary securement of architectural components at primary west facade; attachment methods to be designed to not damage historic structure or materials (alternatively, some components 1420 Sutter Street, Floor 2, San Francisco, CA 94109 | TEFarch.com Docusign Envelope ID: 8FC79C5B-22E9-486D-B4BE-E4D2DCA9E299 1010 183
p. 2
may require removal and storage until a further design stage; ● Boarding up of existing facade openings (doors and windows); ● Repair of cracks, spalls, additional damage to exterior stucco and concrete exterior walls to watertight condition;
● For the purposes of budgeting, TEF will include fire sprinkler protection of the building in the schematic design costing set. If the Client elects to move forward with a Fire protection system through Construction Documents, a plumbing engineer will be brought on to the team (as an additional service with an added cost) to provide criteria documents for a design-build fire protection system (see Additional Services).
● The project will result in a cold shell structure. The building will not be conditioned, but will have code-required safety lighting and (at the option of the City) may have a fire protection system installed. Emergency lighting will be designed by the contractor on a design-build basis. Interior finishes will include plywood flooring and unfinished gypsum board walls.

In order to complete this work, the building will first be fully documented to generate as-built drawings and a civil site survey to document existing utilities, site topography etc. An existing conditions site analysis is required for both the HSR and upgrade work and will be completed in two separate visits. A summary of the project team, scope, and assumptions are listed below and in the attached Exhibit B: Task & Hours Summary. Any variance from the items outlined below may require a revision to the proposed fees.

PROJECT TEAM & DISCIPLINES

ARCHITECT & PRESERVATION ARCHITECT
TEF Design, 1420 Sutter St., 2nd Flr, San Francisco, CA 94109 Maryam Rostami, Principal and Lindsey Moder, Project Manager and Preservation Architect

ARCHITECTURAL HISTORIAN
Groundwork Preservation LLC, 26445 Cape Horn Rd, Colfax, CA 95713 Gretchen Hilyard Boyce, Principal

STRUCTURAL ENGINEER
Tipping Engineers, 1906 Shattuck Avenue, Berkeley, CA 94704 Marc Steyer, SE, Principal

CIVIL ENGINEER
BKF Engineers, 255 Shoreline Drive, Suite 200, Redwood City, CA 94065 Jonathan Tang, PE, Associate Principal

COST ESTIMATOR
TBD Cost Consultants, 2063 Grant Road, Los Altos, CA 94024 Deo Bhalotia, Principal
1420 Sutter Street, Floor 2, San Francisco, CA 94109 | TEFarch.com Docusign Envelope ID: 8FC79C5B-22E9-486D-B4BE-E4D2DCA9E299 1011 184
p. 3

PROJECT SCOPE & PHASES
The project scope of work described herein is based on a phone conversation with members of the City’s Community Development Department on October 16, 2024.

HISTORIC STRUCTURE REPORT (HSR)

1. Gather and review available building information in preparation for site visit.

2. Attend site visit* to document building conditions photographically and graphically by hand. Our evaluations will:
a. Be completed from ground using visual observation only; b. Include evaluation of interior spaces and finish conditions; c. Include evaluation of the roof and roofing components; d. Identify observed and known deferred maintenance, repairs, and required replacements; e. Identify character defining features.
*Project team will require assistance from the City to coordinate a site visit, to remove existing plywood from the building facade to enable visual inspection of all building elevations and access to the building interior, and to provide additional presence on site during the evaluation.

3. Complete research at pre-identified local repositories and online, as needed. (TEF & GP only)

4. Attend & facilitate (1) meeting with the City to present findings of team investigation (TEF & GP only)

5. Complete report and submit to the City.

Meetings

1. Site Investigation Results Meeting with the City
Deliverable Dates:

1. Historic Structure Report Draft: October, 2025

BUILDING STRUCTURAL UPGRADES AND BUILDING SHELL IMPROVEMENTS Phase 1: Building Existing Conditions Assessment

1. Initial site visit to:
a. Review site survey and grades with Civil Engineer (to occur at HSR site visit); b. Review building deficiencies with structural engineer; c. Take existing conditions measurements to confirm existing drawings; d. Fully document building existing conditions (photographically, in drawings and in words); e. Document existing building systems and service points of connection

2. Prepare base drawings (incorporating existing conditions) using existing drawings** and documented building measurements.
a. Architect will document existing MEP systems/ components with the understanding that they will all be demolished back to source for future redesign. b. Structural Engineer to prepare existing conditions drawings to document building structural components.
c. Base drawings to include:
i. Site Plan (based on Civil Survey)
ii. Floor Plans
iii. Roof Plan
iv. Elevations
v. Building Section
**Note: TEF has located as-built drawings prepared by The Architecture Company in 2009. A reimbursable cost has been included here to purchase these drawings. 1420 Sutter Street, Floor 2, San Francisco, CA 94109 | TEFarch.com Docusign Envelope ID: 8FC79C5B-22E9-486D-B4BE-E4D2DCA9E299 1012 185
p. 4

3. Complete building code analysis. Prepare a memo that identifies code requirements and recommendations as related to current codes and Fire Marshal requirements.

Meetings:

1. Bi-weekly call-in meetings with the City, Architect and appropriate AE Team members. Topics to include, but not limited to: Conditions survey findings, and approach to building stabilization.

2. Regulatory Meetings (1 meeting per AHJ):
a. Salinas Fire Marshal
b. City of Salinas Building Department
Deliverable Dates:

1. As-built drawings: September, 2025

2. Code Memo: September, 2025
Phase 2: Schematic Design

1. Develop and refine demolition and conceptual plans and for the City’s consideration, review, and comments. Considerations for the conceptual plan may include:
a. Required demolition and/or salvage (including MEP systems) b. Historic elements (interior and exterior) to remain
c. Structural Upgrades. SE will prepare two schemes.

2. Consult with AE Team and cost estimator on demolition, structural upgrade schemes, and exterior envelope repairs and document to inform a Project Cost of Work. a. Provide directives on any non-standard or potentially costly repairs for building envelope and/or new design items.
b. Review Project Cost of Work with the City, including format, categories and assumptions.

3. Prepare for and present to the Salinas Historic Resources Board. This Presentation will include presentation of both the results of the HSR efforts and endeavor to show that the proposed project work is in keeping with the Secretary of the Interior's Standards for the Treatment of Historic Properties. (TEF, Tipping)
a. 1.5-hr in-person presentation (slideshow)

4. Structural Engineer to develop a full scope of services to complete Design Development, Construction Documents, Bidding, and Construction Observation for the Republic Cafe Structural Upgrades following Phase 2 Schematic Design. Please note that Structural Engineer fees provided herein for Phases 3, 4, and 5 are estimated. See Tipping Proposal Exhibit D.

Meetings:

1. Bi-weekly call-in meetings with Owner, Architect and appropriate AE team members. Topics to include, but not limited to: conceptual design review, cost estimate, and presentation to HRB.

Deliverables:

1. Conceptual level building demolition plans.

2. Two conceptual level structural upgrade schemes

3. Conceptual level proposed roof and floor plans, building elevations and building sections annotated with relevant rehabilitation and design work.

4. Cost Estimate

5. HRB Presentation SlideDeck

6. Written Scope of Services to complete Design Development, Construction Documents, Bidding, Construction Observation for the historic Fred Turner Building rehabilitation. 1420 Sutter Street, Floor 2, San Francisco, CA 94109 | TEFarch.com Docusign Envelope ID: 8FC79C5B-22E9-486D-B4BE-E4D2DCA9E299 1013 186
p. 5
Deliverable Dates:

1. Conceptual Level drawings: Late September, 2025

2. Comments on Cost of Work estimate: October, 2025
Phase 3: 90% Construction Document for Building Permit and Pricing

1. Advance design documentation to 90% Construction Documents* and Technical Specifications for Building Permit Submittal for City's approval and as bid documents. a. Construction Drawings and Specifications shall be sufficient for construction of the project.
b. Client and team will choose one schematic structural upgrade scheme to progress to Construction Documents.

2. Update project construction cost estimate and review with the City.

Meetings:

1. Bi-weekly call-in meetings with the City, Architect and appropriate AE Team members.

Deliverables:

1. PDF of Permit Submittal Construction Documents (drawings, technical specifications in CSI format Division 2 through 32, structural calculations) for Building Permit. PDF of 100% Submittal Construction Documents for Building Permit:
a. Drawings to include:
i. Title and building code summary sheets;
ii. Site plan
iii. Demolition basement, first floor and roof plans, and demolition elevations/sections;
iv. Floor plans;
v. Building elevations and sections – elevations to include facade repair notes; vi. Exterior repair details;
vii. Structural Foundation and framing plans, and structural details; b. Technical specifications in CSI format Division 2 through 32; i. Division 1 specifications pertaining to historic preservation requirements only; c. Structural calculations

2. Appropriate Division 1 specifications pertaining to historic preservation treatment plans, selective demolition, and building monitoring.

3. Ten copies of Construction Documents for Bidding and make available "camera-ready" PDF copies
Deliverables Date:

1. Building Permit Set Submittal: January, 2026
Needed from the City:

1. The City shall provide "front-end" specifications of Project Manual including Instruction to Bidders, Contract, General Conditions and Division 1.

Phase 4: Conformed Set (100% Construction Documents)

1. Meet with City permit review staff as needed to refine plans for resubmittal. Obtain final permit.

2. After receipt of City's approval of Working Drawings, Technical Specifications, and results/changes based on external cost estimate and constructability review, assemble 100 % Final specifications and drawings.
1420 Sutter Street, Floor 2, San Francisco, CA 94109 | TEFarch.com Docusign Envelope ID: 8FC79C5B-22E9-486D-B4BE-E4D2DCA9E299 1014 187
p. 6
Meetings:

1. Up to two (2) meetings with Permit Service Center

2. Bi-weekly call-in meetings with the City, Architect and appropriate AE Team members.

Deliverables:

1. Building Permit Set Resubmittal including Building Department permit comment responses Deliverable Dates:

1. Building Permit Set Resubmittal: TBD.

2. 100% Submittal Construction Documents: TBD
Phase 5: Construction Administration and Project Closeout

1. Support the City and the Contractor in the construction of the project in accordance to the contract documents, schedule and budget; and in the turnover of a complete project. The City shall provide prompt written notice to the Architect if theCity becomes aware of any fault or defect in the project, including errors.

2. Lead the design team and coordinate with the contractor and the City during construction. a. Review General Contractor’s Construction Schedule.
b. Response to field inquiries and RFI’s – Assume 20 RFIs c. Create Architect’s Construction sketches – Assume 10 ASKs and 30 per each consultant d. Review submittals and coordination of reviews by the City – Assume 10 submittals plus (1) resubmittal per each submittal
e. Develop and issue Supplemental Instructions – Assume 10 ASIs f. Review change order proposals and change orders prepared by others.(up to 15) g. Review contractor pay applications (assume 12)
h. Attend monthly project construction meetings. (GC to lead meetings and issue minutes.) i. Perform quality-assurance/field observation walks following regularly scheduled project meetings, and prepare site observation reports – assume 6 reports j. Coordinate code-related changes to the project with the City.

3. Manage the Design Team’s final review and punch list efforts a. Coordinate the design team and perform punch list walks, and issue in writing to GC the observations or corrections required for inclusion in punch list – assume 2 punch lists i. Conduct two rounds of on-site review.
ii. Approve completed punch list.

Meetings:

1. On-site Construction meetings – 6, bi-monthly

2. Telephone Construction meetings- 24, every other week except for on-site per above

3. Two site walks total for punch list
Schedule Estimate

1. Construction and construction close-out duration assumed 12 months 1420 Sutter Street, Floor 2, San Francisco, CA 94109 | TEFarch.com Docusign Envelope ID: 8FC79C5B-22E9-486D-B4BE-E4D2DCA9E299 1015 188
p. 7

ADDITIONAL SERVICES
The Additional Services listed below are not included in the Basic Services but may be required for the Project.

1. Drone Services: Fee to hire drone services for additional photos of the building. See Spaur Group Proposal Exhibit H.

2. Prepare and manage team development of as-built drawings. a. Review GC’s as-built drawings for architectural, civil, landscape, structural, plumbing, mechanical, electrical and lighting, and coordinate effort to deliver a complete Record Set for the project.

3. Structural Engineering for Phases 3 through 5: Scope & fee clarifications based on scope determined in Phase 2: Schematic Design. See Tipping Proposal Exhibit D.

4. Fire Protection System: Coordination & plumbing engineering services for design-build criteria documents

ASSUMPTIONS

1. Project drawings will be generated in Revit. Delivery of AutoCAD to the City may be requested but no specific CAD standards are required.

2. Civil Site Survey will be prepared in CAD and shared with the City in native format. No specific CAD standards are required.

3. All work shall comply with current codes.

4. The Client will provide continuity of staff to serve as the primary contact(s) through the duration of the project.

5. See Exhibit A for the proposed project schedule.

6. The following are the responsibility of the City:
a. Geotechnical investigation and report including foundation design recommendations and seismic site.
b. Pest and termite inspection and report.
c. Hazardous materials investigation and report. The Architect and our Consultants shall have no responsibility for the discovery, presence, handling, removal or disposal of, or exposure to, hazardous materials or toxic substances in any form at the project site.
d. Destructive testing.
e. Permit submittal costs

EXCLUSIONS

GENERAL

1. Work related to the investigation or handling of Hazardous Materials

2. Materials testing and inspections or selective demolition

3. Geotechnical Investigations

4. Design or installation of building security systems

5. Generation of multiple conceptual design plans and multiple and additional revisions/iterations of conceptual and schematic design plans.

6. Meetings and presentations additional to those listed in Scope of Services.

7. Overall project management, including overall project and construction schedule, project budget and project bidding process.

8. Presentation drawings and renderings (of elevations, floor plans and 3-D views), and physical and computerized models (hard copy and/or digital) for the City's use. 1420 Sutter Street, Floor 2, San Francisco, CA 94109 | TEFarch.com Docusign Envelope ID: 8FC79C5B-22E9-486D-B4BE-E4D2DCA9E299 1016 189
p. 8

9. Phasing plans and strategy.

10. Environmental review, documentation, coordination or completion of required mitigation measures required by Salinas Planning Department, California Environmental Quality Act (CEQA), or National Environmental Protection Act (NEPA) may be completed as an additional service to this proposal.

11. Not responsible for tests, inspections, and reports required by law or the Contract Documents, such as structural, mechanical, and chemical tests, tests for air and water pollution, and tests for hazardous materials.

12. Not responsible for all legal, insurance and accounting services, including auditing services, that may be reasonably necessary at any time for the Project to meet the City’s needs and interests.

13. Energy, comfort (temperature) and thermal computational modeling and related graphic imagery.

14. LEED or any other sustainable design program documentation and submittal for certification..

15. Redraw or redesign due to unforeseen conditions – including unknown site conditions, impact of surrounding project (as identified by City’s approval process), unpredictability of bid climate and escalating construction cost.

16. Emergency generator.

17. Renewable energy such as photovoltaic arrays and systems.

18. Front End Documents including the following typically included in a Project Manual:

Introductory Information, Bidding Requirements, Instructions to Bidders, Contracting Requirements, Division 1 and Division 2 of the Specifications Sections

19. Special documentation of additive or deductive bid alternates in Construction Documents.

20. Review of bidders’ pre-qualifications.

21. Construction means and methods.

CONSTRUCTION ADMINISTRATION

1. Meetings and presentations additional to those listed in Scope of Services

2. Overall project management and construction management, including overall project and construction schedule, project budget, bidding process and direction to selected general contractor

3. Establishing design criteria for designing or making field observations of shoring for building excavations or underpinning of adjacent structures, or temporary support of building elements during construction.

4. Continuous and/or detailed inspections of construction including Special Inspections as defined in Section 1704 of the California Building Code.

5. Special construction and inspections – Typically conducted by the City’s engineering testing laboratory.

6. Submittal list – Typically prepared by the General Contractor.

7. Construction administration services beyond 12 months

8. Additional RFI or Submittal review beyond the assumptions listed above

9. Prepare Requests for Proposal (RFP)

10. Review proposals prepared by General Contractor
1420 Sutter Street, Floor 2, San Francisco, CA 94109 | TEFarch.com Docusign Envelope ID: 8FC79C5B-22E9-486D-B4BE-E4D2DCA9E299 1017 190
p. 9

FEE SUMMARY
The proposed fees are lump sum figures, as follows:

HSR Fee Summary
TEF Design (Historical Architect) $47,337.00
Groundwork Planning (Architectural Historian) $23,824.19 Tipping Structural Engineers (Structural) $5,250.00
TOTAL $76,411.19
Structural Upgrades Fee Summary
TEF Design (Historical Architect) $166,913.92
Tipping Structural Engineers (Structural) $10,250.00 (excludes Phases 3-5) BKF Engineers (Civil) $8,250.00
TBD Consultants (Cost Estimate) $41,360.00
TOTAL $226,773.92
A breakdown of the team proposed fees can be found in the attached Exhibits C, D, E, and F. Fees will be invoiced on a monthly basis on percentage of completion. Reimbursable expenses will be invoiced monthly. Additional services will be performed only upon your written authorization, should they be requested. Please note that the structural engineering fees provided for Phases 3, 4 & 5 of the Building Structural Upgrades & Building Shell Improvement phases are estimates. Any additional scope that is determined during Phase 2 will be proposed as an additional service.

Additional Services
Drone Services (See Exhibit G) $488.58

CONCLUSION
Please feel free to contact me if you have any questions or comments. If you agree with the terms of this proposal, please sign below. We are excited to continue supporting the City of Salinas with this project.

Sincerely,
Maryam Rostami, AIA, LEED AP, NOMA, LFA Douglas Tom, FAIA, LEED AP Principal Founding Principal
Agreed by Date
1420 Sutter Street, Floor 2, San Francisco, CA 94109 | TEFarch.com Docusign Envelope ID: 8FC79C5B-22E9-486D-B4BE-E4D2DCA9E299 1018 191
p. 10
Attachments: Exhibit A - Proposed Project Schedule
Exhibit B - Task & Hours Summary: Architectural, dated 28, October 2024 Exhibit C - GroundWork Preservation Proposal
Exhibit D - Tipping Engineers Proposal
Exhibit E - BKF Engineering Proposal
Exhibit F - TBD Consultants Proposal
Exhibit G - Spaur Group Proposal
1420 Sutter Street, Floor 2, San Francisco, CA 94109 | TEFarch.com Docusign Envelope ID: 8FC79C5B-22E9-486D-B4BE-E4D2DCA9E299 1019 192
37 Soledad Street HSR & Structural Upgrades
PROPOSED Project Schedule10/29/24, Revised 06/10/25
EXHIBIT A Docusign Envelope ID: 8FC79C5B-22E9-486D-B4BE-E4D2DCA9E299 193 1020
TEF Design 10/29/24
37 Soledad Street HSR and Structural Upgrades
City of Salinas
TASK & HOURS SUMMARY: Design Team Summary
HSR Fee Summary Structural Upgrades Fee Summary Financial Feasibility Analysis TEF Design (Historical Architect) $47,337.00 TEF Design (Historical Architect) $166,913.92 EPS Inc (Market Study) $12,500.00 Groundwork Planning (Architectural Historian) $23,824.19 Tipping Structural Engineers (Structural) $10,250.00 (excludes Phases 3-5) TOTAL $12,500.00
Tipping Structural Engineers (Structural) $5,250.00 BKF Engineers (Civil) $8,250.00 TBD Consultants (Cost Estimate) $41,360.00
TOTAL $76,411.19 TOTAL $226,773.92
Additional Services
Drone Services $488.58

BASIC SERVICES FIRM
HSR Tasks
TEF
Design
(Historical
Architect)
Tipping
Engineers
(Structural
Engineer)
Groundwork
Planning
(Architectural
Historian)
Total

1.0 Gather and review available information $530.00 $1,000.00 $2,240.00 $3,770.00

2.0 Attend Site Visit $4,680.00 $1,000.00 $3,180.00 $8,860.00

3.0 Complete Research $670.00 - $3,180.00 $3,850.00

4.0 Present Findings to Client $670.00 - $560.00 $1,230.00

5.0 Complete and submit report $38,260.00 $3,000.00 $14,100.00 $55,360.00

6.0 Project Mangagement $2,000.00 - - $2,000.00
Reimbursable Expenses $527.00 $250.00 $564.19 $1,341.19 TOTAL $76,411.19

BASIC SERVICES FIRM
Structural Upgrade Tasks
TEF
Design
(Historical
Architect)
Tipping
Engineers
(Structural
Engineer)
BKF
Engineers
(Civil Engineer)
TBD
Consultants
(Cost Esimate)
Total
Phase 1: Building Existing Conditions Assessment (3 weeks)

1.1 Attend Site visit $3,120 $1,000 $500 - $4,620.00

1.2 Prepare Existing Conditions Drawings $7,600 $2,000 - - $9,600.00

1.3 Building Code Analysis $1,840 - - - $1,840.00

1.4 Bi-weekly Project Meetings (1) $750 - - - $750.00

1.5 Project Mangagement $2,000 - - - $2,000.00
Task 1 Sub-Total $18,810.00
Phase 2: Schematic Design ( 3 weeks)

2.1 Develop Schematic Design Drawings $7,200 $7,000 $7,500 - $21,700.00

2.2 Cost Estimate Coordination $1,840 - - $18,800 $20,640.00

2.3 Prepare for HRB Presentation $2,400 - - - $2,400.00

2.4 Attend HRB Presentation $3,360 - - - $3,360.00

2.5 Bi Weekly Project Meetings (4) $3,000 - - - $3,000.00

2.6 Project Management + QC $2,000 - - - $2,000.00
Task 2 Sub-Total $53,100.00
Phase 3: 90% Construction Documents (10 weeks)

3.1 Develop Construction Documents $19,400 - - - $19,400.00

3.2 Develop Technical Specfications $13,600 - - - $13,600.00

3.3 Update Construction Cost Estimate $2,120 - - $22,560 $24,680.00

3.4 Prepare Permit submission to City $650 - - - $650.00

3.5 Bi-weekly Project Meetings (8) $4,080 - - - $4,080.00

3.6 Project Management + QC $2,040 - - - $2,040.00
Task 3 Sub-Total Task 3 Sub-Total $64,450.00
Phase 4: Conformed Set (100% Construction Documents) (3 weeks)

4.1 Respond to City Questions/ attend meeting with review staff (virtual) $3,040 - - - $3,040.00

4.2 Revise Drawings $3,480 - - - $3,480.00

4.3 Revise Specifications $4,080 - - - $4,080.00

4.4 Bi-weekly Project meetings (4) $2,040 - - - $2,040.00

4.5 Project Management $1,360 - - - $1,360.00
Task 4 Sub-Total $14,000.00
Phase 5: Construction Administration and Project Close-out (assume 12 month construction duration)

5.1 Review GC Schedule $1,240 - - - $1,240.00

5.2 Respond to RFIs (up to 20) $11,800 - - - $11,800.00

5.3 ASKs (up to 10) $5,900 - - - $5,900.00

5.4 Submittal Review (up to 10) $7,300 - - - $7,300.00

5.5 ASIs (up to 10) $7,300 - - - $7,300.00

5.6 Change Order review (up to 15) $6,750 - - - $6,750.00

5.7 Contractor Pay Application Reviews (up to 12) $3,400 - - - $3,400.00

5.8 OAC Meetings - virtual (24) $7,440 - - - $7,440.00

5.9 Site Walks (6) $16,560 - - - $16,560.00

5.1 Punch walk and write up (2) $5,860 - - - $5,860.00
Task 5 Sub-Total $73,550.00
Reimbursable Expenses $2,363.92 $250.00 $250.00 $0.00 $2,863.92 TOTAL $226,773.92

EXHIBIT B
Docusign Envelope ID: 8FC79C5B-22E9-486D-B4BE-E4D2DCA9E299 1021 194
Project Name:

Date:

Prepared By:

Prepared For:

Notes
Rate Unit Qty Cost Qty Cost Qty Cost Qty Cost
$190.00 Hour 8 $1,520.00 24 $4,560.00 62 $11,780.00 94 $ 17,860.00 Task 2: Assumes 2 staff for
1 day site visit including
travel time.

Associate Cultural Resources Historian $90.00 Hour 8 $720.00 20 $1,800.00 32 $2,880.00 60 $ 5,400.00 Task 3: Includes up to 2
hours of meetings with
client to discuss findings.

Total $ 23,260.00
Expense Description Rate Unit Qty Cost Qty Cost Qty Cost Qty Cost Mileage (1 site visit, round
trip to site from Colfax, CA =
500 miles)
Federal Rate $0.670 Mile 470 $314.90 470 $314.90
Per Diem (meals)
Daily Rate
(Monterey
County)
$74.00 Day 2 $148.00 2 $148.00
Research Fees $50.00 Flat rate 1 $50.00 1 $50.00
10% Markup $0.00 $51.29 $0.00 0 $51.29
Total $564.19
Total Direct
Labor
Total
Expenses
Total
Project Cost
$564.19
$2,240.00 $6,924.19 $14,660.00 $23,824.19
$0.00 $564.19 $0.00
$23,260.00
Task 1: Background
Review
Task 2: Site
Visit/Research Task 3: Final HSR
$2,240.00 $6,360.00 $14,660.00
Expenses
Totals
October 22, 2024
Totals
Labor
Lindsey Moder, TEF Architects
Task 1: Background
Review Task 3: Final HSR
Task 2: Site
Visit/Research
3 Site visits are inclusive of travel time.
1 Electronic deliverables only, no printing.
2 No rounds of review and comment from client.

Gretchen Hilyard Boyce, Groundwork
Preservation, LLC
Historic Structure Report, Soledad
Street, Salinas, CA
Title
Principal
Assumptions

EXHIBIT C
37 Docusign Envelope ID: 8FC79C5B-22E9-486D-B4BE-E4D2DCA9E299 1022 195
October 28, 2024
Maryam Rostami
TEF Design
1420 Sutter Street
San Francisco, CA 94109
Re: 37-39 Soledad Street Stabilization
37 Soledad Street
Salinas, CA 93901
Job No. 2024.294.00
Dear Maryam,
Thank you for considering Tipping for the proposed stabilization and retrofit of 37-39 Soledad Street in the historic Chinatown district of Salinas. We are delighted to work with you on this important renovation.

We have based our proposal on the scope of work described in an email from TEF Design, dated October 21, 2024 and a Market Value Appraisal Report by Pacific Appraisers dated November 22, 2022. We understand the property is part of the Chinatown Revitalization Project Plan by the City of Salinas and will ideally be preserved and improved as a cultural heritage site. The buildings are currently in poor condition, requiring stabilization. From our conversations with you, we understand that the City wishes to pursue construction of a seismic retrofit scheme as an integral part of the building stabilization, in anticipation of future improvements and use of the site.

The existing site includes two adjoining buildings constructed in 1942, each two-stories tall and totaling approximately 9,431 square feet of interior space. 37 Soledad Street, also known as the Republic Cafe, is on the National Register of Historic Places and recognized by the State of California as a historic building. A fire in October of 2022, along with much deferred maintenance, has rendered the wood-framed buildings uninhabitable.

PROJECT GOALS
As the building has been damaged by fire and neglect, and noting the historic nature of this building, the first goal is to document the existing condition of the building in a Historic Structure Report (HSR).

Following that effort, the goal will be to present options for stabilization and retrofit for future occupancy. Given that seismic renovation scope and construction costs typically vary, we understand that you will rely on Tipping providing good information and insight early in the process to inform the

EXHIBIT D
Docusign Envelope ID: 8FC79C5B-22E9-486D-B4BE-E4D2DCA9E299 1023 196
37-39 Soledad Street Stabilization October 28, 2024
team's critical decision making. We anticipate that the retrofit work would consist primarily of new seismic shear walls or frames (likely at or near the front facade), possible plywood diaphragm strengthening, out of plane concrete wall to framing connections, and other localized measures to ensure the overall stability of the building and mitigate falling hazards.

Given the uncertainty related to the required retrofit scope, this proposal specifically covers the initial seismic evaluation and schematic design phase in which a scope of structural improvements necessary to meet the client goals will be created. This scope defined in schematic design drawings will serve as the basis for future phases of the project.

SCOPE OF STRUCTURAL ENGINEERING SERVICES
The Basic Services for which Tipping Structural Engineers is responsible include the analysis, design, and documentation for the seismic improvements described above. The following is a summary of the services that we will provide through the different phases of the project. Please note that as mentioned above, the scope of this proposal is only for the initial Evaluation / Scope Definition / Schematic Design phase; however, we have outlined the expected scope of future phases (which would be part of a modified or new agreement) for your reference.

Evaluation / Schematic Design / Scope Definition
• Meet with project team to coordinate the work.
• Review any existing structural drawings, geotechnical reports, or other documents made available to us.
• Make one site visit to identify and confirm the configuration of the existing structural systems and observe details of existing construction.
• Define a limited testing program to expose, measure, and document a small sampling of existing structural elements, as necessary, to be performed by an owner-retained contractor or testing laboratory.
• Perform a formal seismic assessment of the building and identify the deficiencies that need to be addressed.
• Document existing conditions for inclusion in the HSR. • Issue a preliminary set of seismic retrofit plans, including up to 2 options, for budgeting and planning.
2 of 8
Docusign Envelope ID: 8FC79C5B-22E9-486D-B4BE-E4D2DCA9E299 1024 197
37-39 Soledad Street Stabilization October 28, 2024
Construction Documents
• Meet with project team to coordinate and deliver the work. • Perform engineering analysis and detailed design of seismic improvements to address noted deficiencies.
• Establish testing and inspection requirements for all structural materials and workmanship. • Prepare complete drawings, specifications, and calculations for permitting, bidding, and construction of the project.

Approvals and Bidding
• Respond to plan check comments and revise plans as necessary. • Advise and consult with client and architect during the solicitation and evaluation of contractor bids
• Issue final construction documents and addenda for construction.

Construction Administration
• Attend a pre-construction conference to answer questions about design intent or interpretation of the documents, and to examine the contractor's understanding of the project and its requirements.
• Review fabrication drawings and construction submittals for overall compliance with the structural portion of the contract documents. We assume a single round of review of complete, coordinated, and timely submittal packages that are reviewed and approved by the contractor prior to review by our office.
• Review inspection and test reports for items detailed on the structural drawings or called out in the specifications. Take necessary action on reports indicating non-conforming items. This excludes significant design revisions that may result from non-conformance with and deviations from the contract documents.
• Respond to questions from the client and/or special inspector regarding interpretation of the structural portion of the contract documents.
• Respond to contractor RFIs. This excludes redesign effort or significant changes to the approved plans due to contractor’s means and methods or requests for substitution. This also excludes the design of repair or remediation measures for damaged or inadequately performed work.
3 of 8
Docusign Envelope ID: 8FC79C5B-22E9-486D-B4BE-E4D2DCA9E299 1025 198
37-39 Soledad Street Stabilization October 28, 2024
• Visit the construction site at appropriate times to observe the progress of construction and its general conformance to structural drawings and specifications. We estimate that the project would include up to three (3) site visits during construction for periodic structural observation.

This excludes site visits for inspection, field coordination, troubleshooting, repair or remediation of damaged or inadequately performed work, and quality control efforts. • Prepare a record set of drawings.

EVALUATION / SCOPE DEFINITION / SCHEMATIC DESIGN: FEE
We propose to provide basic structural engineering services for the initial Evaluation / Scope Definition / Schematic Design Phase of the project for the fixed sum of $14,000.

ESTIMATED DESIGN FEES FOR FUTURE PHASES
Assuming the project proceeds with a scope of improvements outlined in our initial evaluation / schematic design phase, we would provide the scope of services outlined above for Construction Documents, Approvals and Bidding, and Construction Administration phases. In order for the client to make initial budgeting plans, we have been asked to provide a rough estimate of fees for these phases at this time. Below are these estimates, to be used for planning purposes only. Given the lack of scope definition, we emphasize that they are to be considered preliminary estimates that may change as the project develops.

Phase Estimated Fee Range
Construction Documents $16,000 - $34,000
Approvals and Bidding $2,500 - $5,000
Construction Administration $12,000 - $26,000
If you find this proposal acceptable, please sign and return a copy as our authorization to proceed.

Again, thank you for considering Tipping as part of your team for this project. We look forward to working with you. Please do not hesitate to contact us if you have any questions. 4 of 8
Docusign Envelope ID: 8FC79C5B-22E9-486D-B4BE-E4D2DCA9E299 1026 199
37-39 Soledad Street Stabilization October 28, 2024
Sincerely, Accepted:
______________________________________________
Signature
______________________________________________
Marc Steyer, SE, LEED AP Printed Name and Title
Principal
______________________________________________
Date
24294.wa.odt
5 of 8
Docusign Envelope ID: 8FC79C5B-22E9-486D-B4BE-E4D2DCA9E299 1027 200

BKF ENGINEERS
255 Shoreline Drive, Suite 200, Redwood City, CA 94065 | 650.482.6300 October 28, 2024
BKF No. 20242143
Ms. Maryam Rostami
TEF Design
1420 Sutter Street, 2nd Floor
San Francisco, CA 94109
Transmitted Via Email: [email protected]
Subject: 37 Soledad Street, Salinas
Land Surveying Proposal
Dear Maryam:

BKF Engineers welcomes the opportunity to submit this proposal for land surveying services associated with the project located at 37 Soledad Street in the City of Salinas, California. To arrive at the estimated effort required by our office for this project, we have outlined a proposed scope of services and determined a level of effort fee for each task.

SCOPE OF SERVICES
TASK 1: SITE MEETING

1. Existing Conditions Review: BKF will attend one (1) site meeting with the team to review the existing site constraints and conditions. We will note any potential challenges to development and confirm our scope of survey services to support the project. This task is will be performed in conjunction with the 45 Soledad Street site meeting.

TASK 2: TOPOGRAPHIC AND BOUNDARY SURVEY (37 SOLEDAD)

1. Establishment of Project Survey Control: BKF will perform a Control Survey and establish project control. Horizontal control will be based on California Coordinates System of 1983 (CCS83) relative to California Spatial Reference Network by static GPS observation. Vertical coordinates will be relative to the North American Vertical Datum of 1988 (NAVD88). BKF will establish suitable off-site survey control for use during the preparation of the topographic survey. Permanent control points such as mag nails with washers and cut crosses will be set at the project site as aerial survey targets. BKF will set the topographic survey control points, which will be located outside the project site and will be used by our sub-consultant as control for the initial base mapping.

2. Boundary Analysis: BKF will perform a Boundary Survey and prepare a Boundary Analysis that will define the development parcel area. While performing the field work associated with the topography, BKF will conduct field research for primary monumentation to establish boundary resolution. Once the research and reconnaissance has been completed, BKF will perform a boundary determination, which includes an analysis of the assembled evidence with respect to its relationship to the title and other documentary evidence.

3. Topographic Field Survey: Simultaneous to conducting the field reconnaissance discussed above, BKF will provide the field work to prepare a complete Topographic Map for the subject property. BKF will gather available public data and plans for the site and its surrounding improvements. The topographic survey will be comprised of the following:

EXHIBIT E
Docusign Envelope ID: 8FC79C5B-22E9-486D-B4BE-E4D2DCA9E299 1028 201

Page 2 of 4 ends

a. Terrestrial Survey - BKF will provide the field work to prepare a Topographic Map for the subject property. The limits of the topographic survey will be the subject property and the improved width of roadways along the property frontage. The topographic survey will be comprised of identified visible site features such as roadways, pavements, evidence of significant traveled ways, walls, fences, trees 6- inches and larger in diameter and visual utility infrastructure. We will obtain a succession of spot elevations to define the general terrain of the site and immediately adjacent improvements to produce mapping at a 1-foot contour interval.
b. Utilities - Utility infrastructure within the mapping limits, including sewer, water valves, hydrants, meter boxes, storm drain and marked utilities, if encountered during the course of our field survey, will also be identified. The basic routing, inverts and orientation of the on-site gravity utilities will be identified based on field evidence and any available plans provided if to BKF prior to commencement of the survey. If as-built drawings are not provided or are inconclusive when compared to the field evidence, only data at the dipped structures will be provided. c. Utility Locating - BKF’s in-house utility locators will perform utility investigation services using standard industry acceptable methods as per California Government Code section 4216 to determine the approximate horizontal position and depth of detectable subsurface utilities within the designated area (see attached Limits of Work). BKF’s field crews will use a combination of water-based paint and pin flags to mark the results of our investigation on the ground surface. BKF crews may opt to use the Ground Penetrating Radar (GPR), if the soil conditions will return a good signal to attempt to locate water lines and other utility lines with no tracer wires. Individual field conditions will dictate the thoroughness of our subsurface utility investigation. BKF will perform a reasonable effort to determine the location of the existing underground utility lines; however, due to technical limitations of today’s most modern equipment, no guarantee (expressed or implied) can be made. Irrigation lines, empty conduits, and abandoned utilities will not be located. Potholing and excavation are specifically excluded on this proposal. This scope of work does not include clearing areas for geotechnical boring, soil sampling, and drilling operations.
d. Mapping - BKF will produce the mapping in a reproducible hard copy and electronic format. The signed hardcopy Topographic Map will be an instrument of service. Electronic mapping will be completed in an AutoCAD format and can be transferred and used by other team consultants for their work, as a courtesy.
1) The mapping is anticipated to be compiled at 1" = 20', and will also indicate individual spot elevations at various locations throughout the site. BKF will take a series of photographs for future reference and documentation of current field conditions encountered during the time of our survey.
2) The vertical control for the survey will be tied to the North American Vertical Datum of 1988 (NAVD88), unless otherwise agreed upon in writing prior to commencement of the survey. 3) The horizontal location and rotation of the mapping is anticipated to be on an "assumed" coordinate system otherwise agreed upon in writing prior to commencement of the survey.

Note: Record of Survey
State law requires that the Surveyor of record performing the boundary resolution file a record of survey with the County if a map is not prepared as part of the project. As this project may anticipate pursuing a Tentative Parcel and Final Parcel Map for Condominium Purposes, we have currently excluded fee for this task in our scope of services. If a determination is made to eliminate pursuing filing of a map as part of the final permitting process BKF will be required to prepare and file a record of survey with the County at the expense of the owner. Recordation fees are not included in our proposal.

Docusign Envelope ID: 8FC79C5B-22E9-486D-B4BE-E4D2DCA9E299 1029 202

Page 3 of 4 ends

SCOPE QUALIFICATIONS AND ASSUMPTIONS
BKF Engineers' services are limited to those expressly set forth in the scope. We understand that BKF will have no other obligations or responsibilities for the project except as provided in this proposal letter, or as otherwise agreed to in writing. BKF will provide the scope of services consistent with, and limited to, the standard of care applicable to such services. For the scope of work identified, we have assumed the following:
1) Basis of Design and Site Information
a) Topographic Survey: Proposal assumes field survey will be completed for 37 and 45 Soledad Street sites concurrently. Separate mobilizations to survey each site independently will be an additional service. b) Title Report: A current title report for the property will be provided by the owner. c) Potholing: Potholing services are not included in this proposal unless specifically identified.

COMPENSATION

1. BASE SCOPE OF WORK:

BKF proposes to provide the services on a lump sum basis. We will invoice for our services on a percent complete basis per task summarized as follows:

Task Description Fee
1 Site Meeting $500
2 Topographic and Boundary Survey (37 Soledad) $7,500
Total Labor Fee $8,000
In addition, please budget $250 for reimbursable expenses. Reimbursable expenses are anticipated for reproduction, mileage, express and messenger deliveries, and computer deliverable plots. Reimbursable expenses will be billed on a cost plus 10-percent markup basis.

For tasks requested by the owner or Architect not defined in this scope of services, BKF will identify them as potential extra work. We can provide a scope and fee for these items or they may be tracked separately as extra work and billed on a time and materials per our attached rate schedule.

Thank you for the opportunity to present this proposal. We look forward to assisting in developing this project.

Please contact me at 650-482-6306 if you have any questions regarding our scope of services.

Respectfully,
BKF Engineers
Jonathan Tang, PE
Associate Principal
Docusign Envelope ID: 8FC79C5B-22E9-486D-B4BE-E4D2DCA9E299 1030 203

Page 4 of 4 ends

BKF ENGINEERS PROFESSIONAL SERVICES RATE SCHEDULE
EFFECTIVE JANUARY 1, 2024

CLASSIFICATION HOURLY RATE

PROJECT MANAGEMENT
Principal $302.00
Senior Associate Principal $280.00
Associate Principal $273.00
Senior Project Manager | Senior Technical Manager $265.00 Project Manager | Technical Manager $260.00
Engineering Manager | Surveying Manager | Planning Manager $239.00

TECHNICAL STAFF
Senior Project Engineer | Senior Project Surveyor | Senior Project Planner $222.00 Project Engineer | Project Surveyor | Project Planner $195.00 Design Engineer | Staff Surveyor | Staff Planner $170.00 BIM Specialist I, II, III $170.00 - $195.00 - $222.00
Technician I, II, III, IV $162.00 - $172.00 - $189.00 - $203.00 Drafter I, II, III, IV $127.00 - $139.00 - $150.00 - $167.00 Engineering Assistant | Surveying Assistant | Planning Assistant $106.00

FIELD SURVEYING
Survey Party Chief $222.00
Instrument Person $190.00
Survey Chainperson $143.00
Utility Locator I, II, III, IV $116.00 - $164.00 - $197.00 - $224.00 Apprentice I, II, III, IV $88.00 - $118.00 - $130.00 - $138.00

CONSTRUCTION ADMINISTRATION
Senior Consultant $290.00
Senior Construction Administrator $253.00
Resident Engineer $188.00
Field Engineer I, II, III $170.00 - $195.00 - $222.00

FUNDING & GRANT MANAGEMENT
Director of Funding Strategies $208.00
Funding Strategies Manager $190.00
Funding/Research Analyst I, II, III, IV $130.00 - $150.00 - $160.00 - $176.00

PROJECT ADMINISTRATION
Project Coordinator $142.00
Senior Project Assistant $122.00
Project Assistant $108.00
Clerical | Administrative Assistant $90.00
Expert witness rates are available upon request. Subject to the terms of a services agreement:
• Charges for outside services, equipment, materials, and facilities not furnished directly by BKF Engineers will be billed as reimbursable expenses at cost plus 10%. Such charges may include, but shall not be limited to: printing and reproduction services; shipping, delivery, and courier charges; subconsultant fees and expenses; agency fees; insurance; transportation on public carriers; meals and lodging; and consumable materials. • Allowable mileage will be charged at the prevailing IRS rate per mile. • Monthly invoices are due within 30 days from invoice date. Interest will be charged at 1.5% per month on past due accounts.
• The rates shown are subject to periodic increases, including January 1st of each year.

Docusign Envelope ID: 8FC79C5B-22E9-486D-B4BE-E4D2DCA9E299 1031 204
Project Management | Construction Cost Management
Our ref.: DB
October 28th, 2024
Maryam Rostami
TEF Design
1420 Sutter Street, 2nd Floor
San Francisco, CA 94109
Re: Fee Proposal – Cost Estimating Services
37 Soledad Street Café Building
2063 Grant Rd.

Los Altos, CA, 94024
Tel: 415.981.9430
Dear Maryam,
Further to your email, we are pleased to offer Cost Estimating services for the above project.

Scope of Services
We understand the scope of our services is to prepare an opinion of probable cost for the City of Salinas Soledad Street Café Building; we understand this project involves structural upgrades to the historic, two-story, reinforced concrete building The opinion of probable cost will be at the Schematic and Construction Documents of design.

The estimate will be based on the measurements of quantities from the drawings with composite unit rates reflecting the scope of work and the current market conditions. We will not obtain any bids or opinions of cost from subcontractors unless the work is of such a unique nature that no other cost information is available. No bids or third-party opinions will be obtained without prior approval from the client.

We have included time required to review and discuss our cost estimate with the Design Team and for incorporating any requested revision to the estimate as a result of the Design Team review. We have excluded any time required to reconcile our estimate with another cost estimate prepared by others. We have also excluded time required to attend any meetings or any Value Engineering cost services from this proposal. Should additional work be required, our standard hourly rate of $235 per hour will apply.

EXHIBIT F
Docusign Envelope ID: 8FC79C5B-22E9-486D-B4BE-E4D2DCA9E299 1032 205
Project Management | Construction Cost Management
Fees
We propose to provide the above services based on the following budget NTE Fees – 90% SD Cost Estimate (80 hrs @ $235/hr.) $ 18,800
100% CD Cost Estimate (96 hrs @235/hr.) $ 22,560
Total Not to Exceed Fees $41,360
We assume no alternates or options.

Expenses such as drawing reproduction, courier services, special mailing services (Federal Express, Express Mail etc.), and other abnormal costs are excluded and will be charged at cost plus 0% administration.

Our fees exclude travel costs outside the San Francisco Bay Area, any such travel costs as incurred will be billed separately.

Payment and Terms
We will issue a monthly invoice. Payment will be due thirty (30) calendar days.

Our proposal remains open for a period of ninety (90) days. After this time, we will be pleased to review the proposal, make any required amendments, and re-submit for your review and approval.

Work will be completed under the direction of Deo Bhalotia.

We trust that we have interpreted your requirements correctly, if you have any questions or suggested amendments, please do not hesitate to contact the undersigned. If you would like to proceed with the above services, please complete and return the authorization below.

We look forward to working with you on this project.

On behalf of TBD Consultants On behalf of TEF Design
Accepted by:

Deo Bhalotia
Associate Principal Date:

Title:

Docusign Envelope ID: 8FC79C5B-22E9-486D-B4BE-E4D2DCA9E299 1033 206
Project Management
| Construction Cost Management
Docusign Envelope ID: 8FC79C5B-22E9-486D-B4BE-E4D2DCA9E299 1034 207

ESTIMATE
Spaur Group
988 Easton Ave
San Bruno, CA 94066
[email protected]
+1 (510) 559-0856
www.spaurgroup.com
Bill to
TEF Design
1420 Sutter St, 2nd Floor
San Francisco, CA 94109
Estimate details
Estimate no.: 1008
Estimate date: 10/29/2024
# Date Product or service Description Qty Rate Amount

1. Aerial Photography Aerial photography and imagery processing:
nadir, oblique, and/or 360 imaging.

2.25 $200.00 $450.00

2. Travel 192 $0.65 $124.80
Note to customer
Aerial photography of buildings at 37 Salinas st Salinas, CA. Imagery to show current conditions of building roof and will consist of 10-15 photos from mostly top down perspective, and including 360 panoramic images from corners of building. Images will include metadata of GPS location and orientation of images.

Price includes introductory discount.

Thank you for your business!
Subtotal $574.80
Discount 15% -$86.22
Total $488.58
Accepted date Accepted by

EXHIBIT G
Docusign Envelope ID: 8FC79C5B-22E9-486D-B4BE-E4D2DCA9E299 1035 208

Page 1 of 2 ends

Version: July 2024
AGREEMENT —AMENDMENT NO. [3] TO

AGREEMENT FOR PROFESSIONAL SERVICES

BETWEEN
TEF ARCHITECTURE AND INTERIOR DESIGN, INC. AND CITY OF SALINAS This Amendment No. [3] to the Professional Services Agreement (the “Amendment”) is entered into this 28th day of October 2025, by and between the City of Salinas (the “City”) and TEF Architecture and Interior Design, Inc., (the “Consultant”). City and Contractor may be individually referred to herein as a “Party” and collectively the City and Contractor may be referred to as the “Parties.”

RECITALS
WHEREAS, the City and Contractor first entered into a/an Professional Services Agreement effective July 1, 2024, pursuant to which Contractor agreed to act as and provide certain services to the City for compensation (the “Agreement”); and
WHEREAS, on November 19, 2024, the Council approved Amendment No. 1 to the TEF Architecture and Interior Design, Inc. agreement to refine the design concepts further and select a preferred concept for 34-38 Soledad Street, to include additional design and pre-development work for the City-owned property at 45 Soledad Street, extend the term of the contract to December 31, 2025, and increase the not to exceed amount to $252,290.00; and
WHEREAS, On July 1, 2025, the Council approved Amendment No. 2 to develop the design concepts for 34-38 37-39, and 45 Soledad Street into schematic designs for entitlement prior to the preparation of a Request for Proposals for development of the sites, extend the term of the contract to December 31, 2026, and increase the not to exceed amount to $736,560.00; and

WHEREAS, the City and Contractor desire to further amend the Agreement to reflect the additional scope provided by consultant and reflect the revised compensation to be paid to consultant.

NOW, THEREFORE, in mutual consideration of the terms and conditions set forth below, the Parties agree as follows:

TERMS

1. The Agreement, Scope of Services section, is amended to add the additional services outlined in the Consultant proposal, attached and incorporated by reference.

2. The Agreement, Compensation section, is amended to increase the not to exceed amount to $840,889.00.

3. All other covenants, terms, and conditions set forth in the Agreement and not amended by this Amendment shall remain in full force and effect as if fully set forth herein.

IN WITNESS WHEREOF, the undersigned, as authorized representatives of the City and Contractor have entered into this Agreement as of the date first written above.

CITY OF SALINAS
___________________________________
René Mendez, City Manager
Docusign Envelope ID: 8D648451-9740-4FC8-ACAC-F244B0649467 209 972

Page 2 of 2 ends

Version: July 2024
APPROVED AS TO FORM:
___________________________________
□ Christopher A. Callihan, City Attorney
□ Rhonda Combs, Assistant City Attorney
TEF ARCHITECTURE AND INTERIOR DESIGN, INC.
____________________________________
Printed name: Maryam Rostami__________
Title: Principal________________________
Docusign Envelope ID: 8D648451-9740-4FC8-ACAC-F244B0649467 210 973
Additional Services Request #3: 37-39 Soledad Street, Additional Research & As-Built Services From: Maryam Rostami
TEF Architecture & Interior Design, Inc
1420 Sutter Street, 2nd Floor
San Francisco, CA 94109
ASR No.:

Project No.:
03 22377.03
Project:

Date:
37-39 Soledad Street HSR & Emergency Stabilization
September 02, 2025 Revised September 04, 2025
Client: Grant Leonard
City of Salinas
DESCRIPTION of ADDITIONAL SCOPE of SERVICES & FEES
TEF Design is requesting additional fees pursuant to extended scope items not anticipated by our proposal, including the items listed below, completed by both TEF and Groundwork Preservation.

Scope of Work
The scope of services included in this proposal includes:

1. Additional Research to evaluate 39 Soledad Street for Historical Significance (by Groundwork Preservation)
a. Targeted Archival Research
b. Development of Additional site history and context
c. Update CPHR/HRHP evaluation

2. As-Built Documentation of 39 Soledad Street
(by TEF Design)
a. Additional site visit to building to document existing conditions measurements b. Update of existing Revit model of the building.

A detailed breakdown of each discipline’s services scope are included in attached fee documents.

PROPOSED FEE:

Fees will be invoiced monthly based on the percentage of work completed in that month.

Groundwork Preservation $6,000.00
TEF $1,960.00
TOTAL $7,960.00
Estimated Reimbursables: $293
Upon your agreement, please sign this Additional Services Proposal and/or please provide a Contract Modification. We will commence design services based on completion of a contract modification. 1420 Sutter Street, Floor 2, San Francisco, CA 94109 | TEFarch.com Docusign Envelope ID: 8D648451-9740-4FC8-ACAC-F244B0649467 211 974
Agreed by:

Client: Architect:
_____________________________
Agreed by Maryam Rostami, AIA, NOMA, LEED AP, LFA
Principal
TEF Architecture & Interior Design, Inc.
4 Sep 2025
Date Date
1420 Sutter Street, Floor 2, San Francisco, CA 94109 | TEFarch.com Docusign Envelope ID: 8D648451-9740-4FC8-ACAC-F244B0649467 City Manager
10/30/2025 | 2:03 PM PDT
212 975
TEF Design 09/02/25 Revised 09/04/25
37 Soledad Street HSR and Structural Upgrades
Additional Services Request 3
City of Salinas
TASK & HOURS SUMMARY: Design Team Summary
SCOPE of SERVICES
HSR

HOURS & FEES
Principal Rate Project Rate Project Rate Arch Rate Clerical Rate Total TASKS $350 Manager $250 Arch. $170 Staff $140 Staff $110 Fee

1.0 Update Revit Model 0 $0 2 $500 2 $340 8 $1,120 0 $0 $1,960 Sub-Total 0 $0 2 $500 2 $340 8 $1,120 0 $0 $1,960
Docusign Envelope ID: 8D648451-9740-4FC8-ACAC-F244B0649467 213 976
Project Name:

Date:

Prepared By:

Prepared For:

Notes
Task 4 includes targeted
archival research,
development of additional
site history and context,
and updated CRHR/NRHP
evaluation to include 39
Soledad and Criterion C/3
significance.

Rate Unit Qty Cost Qty Cost
$190.00 Hour 24 $4,560.00 24 $ 4,560.00
Associate Cultural Resources Historian $90.00 Hour 16 $1,440.00 16 $ 1,440.00 Total $ 6,000.00
Expense Description Rate Unit Qty Cost Qty Cost
Mileage (1 site visit, round
trip to site from Colfax, CA =
500 miles)
Federal Rate $0.670 Mile 0 $0.00
Per Diem (meals)
Daily Rate
(Monterey
County)
$74.00 Day 0 $0.00
Research Fees $50.00 Flat rate 0 $0.00
10% Markup $0.00 0 $0.00
Total $0.00
Total Direct
Labor
Total
Expenses
Total Project
Cost
$0.00
$6,000.00 $6,000.00
$0.00
$6,000.00
Task 4: Research and
Significance
Evaluation for 39
Soledad
$6,000.00
Expenses
Totals
August 27, 2025
Totals
Labor
Lindsey Moder, TEF Architects
Task 4: Research and
Significance
Evaluation for 39
Soledad
3 Site visits are inclusive of travel time.
1 Electronic deliverables only, no printing.
2 No rounds of review and comment from client.

Gretchen Hilyard Boyce, Groundwork
Preservation, LLC
Historic Structure Report, 37-39 Soledad
Street, Salinas, CA - Addendum 1
Title
Principal
Assumptions
Docusign Envelope ID: 8D648451-9740-4FC8-ACAC-F244B0649467 214 977
Additional Services Request #4: 37-39 Soledad Street, Concept Design for 39 Soledad Street From: Maryam Rostami
TEF Architecture & Interior Design, Inc
1420 Sutter Street, 2nd Floor
San Francisco, CA 94109
ASR No.:

Project No.:
04 22377.05
Project:

Date:
37-39 Soledad Street Concept Design and
Entitlements Package
September 19, 2025
Client: Grant Leonard
City of Salinas
DESCRIPTION of ADDITIONAL SCOPE of SERVICES & FEES
TEF Design is requesting additional fees pursuant to extended scope items not anticipated by our proposal, including the items listed below, completed by both TEF and Groundwork Preservation.

Scope of Work
The scope of services included in this proposal includes:

Task 1: Additional work to develop a conceptual design and stakeholder engagement for 39 Soledad Street a. Deliverables: Concept Design Presentation w/ 2 Renderings, Slidedecks and Notes from stakeholder engagement meetings
b. Meetings: Three (3) stakeholder engagement meetings, 1 Concept Design Review Meeting c. Duration: 8 weeks (3 weeks Concept Design + 5 weeks Stakeholder Engagement) Task 2: Additional work to proceed through Schematic Design (SD) for 39 Soledad Street - Deliverables: 90SD Drawings (2 sets)
- Meetings: 1 client review meeting, 1 pre-app meeting with Planning - Duration: 6 weeks
Task 3: Additional work to prepare Entitlements Packages for 39 Soledad and respond to comments, revise drawings
- Deliverables: Entitlements Package (2 packages)
- Duration: 6 weeks
PROPOSED FEE:

Fees will be invoiced monthly based on the percentage of work completed in that month.

TEF $34,073.00
Estimated Reimbursables: $613
Upon your agreement, please sign this Additional Services Proposal and/or please provide a Contract Modification. We will commence design services based on completion of a contract modification. 1420 Sutter Street, Floor 2, San Francisco, CA 94109 | TEFarch.com Docusign Envelope ID: 8D648451-9740-4FC8-ACAC-F244B0649467 215 978
Agreed by:

Client: Architect:
_____________________________
Agreed by Maryam Rostami, AIA, NOMA, LEED AP, LFA
Principal
TEF Architecture & Interior Design, Inc.
19 Sep 2025
Date Date
1420 Sutter Street, Floor 2, San Francisco, CA 94109 | TEFarch.com Docusign Envelope ID: 8D648451-9740-4FC8-ACAC-F244B0649467 City Manager
10/30/2025 | 2:03 PM PDT
216 979
Additional Services Request #5: 37-39 Soledad Street Structural Stabilization, Structural effort for Construction Documents and Construction Administration
From: Maryam Rostami
TEF Architecture & Interior Design, Inc
1420 Sutter Street, 2nd Floor
San Francisco, CA 94109
ASR No.:

Project No.:
05 22377.03
Project:

Date:
37-39 Soledad Street HSR and Emergency
Stabilization
September 19, 2025
Client: Grant Leonard
City of Salinas
DESCRIPTION of ADDITIONAL SCOPE of SERVICES & FEES
TEF Design and their consultant, Tipping Engineers, is requesting additional fees pursuant to additional work required to complete this project, including the items listed below, completed by both TEF and Tipping Engineers.

Scope of Work
The scope of services included in this proposal includes:
90% Construction Document for Building Permit and Pricing

1. Advance design documentation to 90% Construction Documents and Technical Specifications for Building Permit Submittal for City's approval and as bid documents. a. Construction Drawings, Specifications, and structural calculations shall be sufficient for construction of the project.
b. Client and team will choose one schematic structural upgrade scheme to progress to Construction Documents.

2. Update project construction cost estimate and review with the City.

Phase 4: Conformed Set (100% Construction Documents)

1. Meet with City permit review staff as needed to refine plans for resubmittal. Obtain final permit.

2. After receipt of City's approval of Working Drawings, Technical Specifications, and results/changes based on external cost estimate and constructability review, assemble 100 % Final specifications and drawings.

Phase 5: Construction Administration and Project Closeout

1. Support the City and the Contractor in the construction of the project in accordance to the contract documents, schedule and budget; and in the turnover of a complete project.

PROPOSED FEE:

Fees will be invoiced monthly based on the percentage of work completed in that month.

Tipping Engineers $58,000.00
TEF $2,640.00
TOTAL $60,640.00
1420 Sutter Street, Floor 2, San Francisco, CA 94109 | TEFarch.com Docusign Envelope ID: 8D648451-9740-4FC8-ACAC-F244B0649467 217 980
Estimated Reimbursables: $750
Upon your agreement, please sign this Additional Services Proposal and/or please provide a Contract Modification. We will commence design services based on completion of a contract modification.

Agreed by:

Client: Architect:
_____________________________
Agreed by Maryam Rostami, AIA, NOMA, LEED AP, LFA
Principal
TEF Architecture & Interior Design, Inc.
19 Sep 2025
Date Date
1420 Sutter Street, Floor 2, San Francisco, CA 94109 | TEFarch.com Docusign Envelope ID: 8D648451-9740-4FC8-ACAC-F244B0649467 10/30/2025 | 2:03 PM PDT
City Manager
218 981
September 10, 2025
Maryam Rostami
TEF Design
1420 Sutter Street
San Francisco, CA 94109
Re: 37-39 Soledad Street Stabilization – ASR#1 - CD-CA
Salinas, CA
Job No. 2024.294.00
Dear Maryam,
We are pleased to provide this proposal for additional services for the 37-39 Soledad Street Stabilization project. This proposal covers tasks and deliverables that are outside the scope of structural engineering services included in our original work agreement, dated August 18, 2025.

This additional services request is necessary to incorporate the design drawings, approvals and construction administration services associated with the implementation of structural stabilization measures identified as part of base scope of work in the August 18, 2025 agreement.

After visiting the site, reviewing relevant documents, drawings, and reports, and discussing the project goals with you and the client, we have identified a scope of recommended structural stabilization measures. We understand that due to funding requirements, the client now intends to complete the construction of the stabilization scope by March of 2026. As such, the design of this work is now proceeding on a faster track than originally anticipated.

The structural scope of stabilization work will include the following:
• Addition of wall to floor out-of-plane anchors at the second floor of both 37 and 39 Soledad (these were previously added at the roof level of 37 Soledad) • Addition of new plywood roof sheathing at 39 Soledad and plywood floor sheathing at the second floor of both 37 and 39 Soledad (not that plywood roof sheathing was previously added to 37 Soledad).
• Addition of a new steel moment frame and footing to provide seismic strength in the building’s transverse direction at the front facade
• Repair of damaged, rotated and detached framing at the front facade • Repair of fire damaged wood framing at the roof and front elevation Docusign Envelope ID: 8D648451-9740-4FC8-ACAC-F244B0649467 219 982
37-39 Soledad Street Stabilization – ASR#1 - CD-CA September 10, 2025 • Coordination to ensure the preservation and/or temporary removal of historic elements at the entry facade that require rehabilitation.

As part of our work, we will provide a set of structural drawings for permit and construction. We will also provide substantiating calculations. We will respond to plan check comments and incorporate changes as required. We will provide typical construction administration services such as responding to contractor requests for information, making site observations, reviewing submittals, etc.

We propose to provide basic structural engineering services for the work described above for the fixed sums indicated below. Please note that this work is being done in accordance with the Additional Services Section of our original agreement referenced above, except the fee is fixed rather than hourly.

Our fee shall be broken down by phase as follows:

Phase Total Fee
Construction Documents $37,000
Approvals and Bidding 3,000
Construction Services 18,000
Total $58,000
If this proposal meets with your approval, please return a signed copy as our authorization to proceed.

We appreciate this opportunity to be of service to you. Please reach out directly if you have any questions or concerns about this additional services request.

Sincerely, Accepted:
______________________________________________
Signature
______________________________________________
Marc Steyer, SE, LEED AP Printed Name and Title
Principal
______________________________________________
Date
2 of 2
Docusign Envelope ID: 8D648451-9740-4FC8-ACAC-F244B0649467 220 983

Page 1 of 2 ends

Version: July 2024
AGREEMENT —AMENDMENT NO. [4] TO

AGREEMENT FOR PROFESSIONAL SERVICES

BETWEEN
TEF ARCHITECTURE AND INTERIOR DESIGN, INC. AND CITY OF SALINAS This Amendment No. [4] to the Professional Services Agreement (the “Amendment”) is entered into this 3rd day of February 2026, by and between the City of Salinas (the “City”) and TEF Architecture and Interior Design, Inc., (the “Consultant”). City and Contractor may be individually referred to herein as a “Party” and collectively the City and Contractor may be referred to as the “Parties.”

RECITALS
WHEREAS, the City and Contractor first entered into a/an Professional Services Agreement effective July 1, 2024, pursuant to which Contractor agreed to act as and provide certain services to the City for compensation (the “Agreement”); and
WHEREAS, on November 19, 2024, the Council approved Amendment No. 1 to the TEF Architecture and Interior Design, Inc. agreement to refine the design concepts further and select a preferred concept for 34-38 Soledad Street, to include additional design and pre-development work for the City-owned property at 45 Soledad Street, extend the term of the contract to December 31, 2025, and increase the not to exceed amount to $252,290.00; and
WHEREAS, On July 1, 2025, the Council approved Amendment No. 2 to develop the design concepts for 34-38 37-39, and 45 Soledad Street into schematic designs for entitlement prior to the preparation of a Request for Proposals for development of the sites, extend the term of the contract to December 31, 2026, and increase the not to exceed amount to $736,560.00; and
WHEREAS, On October 28, 2025, the Council approved Amendment No. 3 to complete additional design, historic structure analysis, and structural engineering work for 34, 36, 38, and 40, 37 and 39, and 45 Soledad Street prior to the preparation of a Request for Proposals for development of the site, and increase the not to exceed compensation amount to $840,889; and
WHEREAS, the City and Contractor desire to further amend the Agreement to reflect the additional scope provided by consultant and reflect the revised compensation to be paid to consultant; and NOW, THEREFORE, in mutual consideration of the terms and conditions set forth below, the Parties agree to further amend the Agreement as follows:

TERMS

1. Section 1 of the Agreement is further amended to add the additional services outlined Consultant proposal attached hereto as Exhibit A to the Consultant’s scope of services.

2. Section 3 of the Agreement is amended to increase the total compensation amount by $473,640, for a maximum compensation amount not to exceed amount to $1,314,499.00.

3. All other covenants, terms, and conditions set forth in the Agreement and not amended by this Amendment shall remain in full force and effect as if fully set forth herein.

Docusign Envelope ID: 30FFE4CC-2616-489F-8F67-0B308E0EA6E5 Docusign Envelope ID: D35B3BE8-6C11-45CA-A070-8F3E1C48400A 221 935

Page 2 of 2 ends

Version: July 2024
IN WITNESS WHEREOF, the undersigned, as authorized representatives of the City and Contractor have entered into this Amendment as of the date first written above.

CITY OF SALINAS
___________________________________
René Mendez, City Manager
APPROVED AS TO FORM:
___________________________________
□ Christopher A. Callihan, City Attorney
□ Rhonda Combs, Assistant City Attorney
TEF ARCHITECTURE AND INTERIOR DESIGN, INC.
____________________________________
Printed name: Maryam Rostami__________
Title: Principal________________________
Docusign Envelope ID: 30FFE4CC-2616-489F-8F67-0B308E0EA6E5 Docusign Envelope ID: D35B3BE8-6C11-45CA-A070-8F3E1C48400A 222 936
26 November 2025 revised 9January 2026
Grant Leonard
Planning Manager
Community Development Department
City of Salinas
[email protected]
831.758.7975
Re: Proposal for Additional Services #5- City of Salinas - Additional Scope Items Dear Grant,
Based on work that exceeds our initial task order agreement, TEF Architecture & Interior Design, Inc. (TEF, TEF Design or Design Team) is asking the City of Salinas (Client) for additional services to complete entitlement drawings for 34-40 Soledad, 37-39 Soledad, and 45 Soledad. Additional scope items are outlined below.

FEE SUMMARY
TASKS

HOURS & FEES
Prncpl Rate Sr Rate Arch Rate Arch Rate Total
$275 PM $200 Level 3 $180 Staff 1 $145 Fee
Additional Scope Items
Delivery of drawings sets at two
separate entitlement packages, in
lieu of one complete package
2 $550 4 $800 4 $720 4 $580 $2,650
Adjusting unit mix to meet Large
Family CTCAC requirements
4 $1,100 8 $1,600 20 $3,600 20 $2,900 $9,200
Preliminary study at test fit level of
45 Soledad to senior use, with goal
of potentially doubling unit count at
this address
2 $550 4 $800 20 $3,600 30 $4,350 $9,300
Tasks related to taking 45
Soledad through Entitlements
Process as per above design
change as per direction from City
of Salinas
12 $3,300 24 $4,800 48 $8,640 60 $8,700 $25,440
Consultant fees to revise 45
Soledad per above, includes MEP
only**
$2,500
Design investigation of adding more
traditional character defining
features at both 34-40 and 45
Soledad
2 $550 2 $400 4 $720 6 $870 $2,540
1420 Sutter Street, Floor 2, San Francisco, CA 94109 | TEFarch.com Docusign Envelope ID: D35B3BE8-6C11-45CA-A070-8F3E1C48400A 223 937
Incorporation of housing comments
delivered to design team including:
addition of trash chutes,
consolidation of laundry room from
in-unit laundry services; addition of
maintenance shop and residential
services office suite; transformer
location at ground level - does not
include change of construction type
at 45 Soledad, should the City
desire to change this.
4 $1,100 6 $1,200 40 $7,200 40 $5,800 $15,300
Update existing renderings and
deliver a total of (4) renderings per
34-40, and 45 Soledad (total of 8
renderings)
8 $2,200 8 $1,600 60 $10,800 80 $11,600 $26,200
Preparation for and attendance of
additional (2) community meetings
8 $2,200 2 $400 4 $720 4 $580 $3,900
Include installation of NFPA-13
compliant Fire sprinkler system
into emergency stabilization CDs,
CA of 37-39 Soledad St
0 $0 6 $1,200 0 $0 0 $0 $1,200
Plumbing Engineer fees to
complete sprinkler install per
above. (Specs only)**
$5,000
Provide Cost Estimate for 37-39
Schematic Design Package
(includes cost narrative by TEF)
0 $0 8 $1,600 24 $4,320 0 $0 $5,920
Cost Estimator fees to provide
SD level estimate per above**
$20,400
Provide Permit & Bid Documents,
Construction Administration for
Rehabilitation of 37-39 (includes
fees for TEF, Structural, MEP,
Civil and Spec Writer)***
$344,060
Total Proposed Fee 42 $11,550 58 $14,400 200 $40,320 244 $35,380 $473,610 ** See Exhibit B for Consultant Proposals
*** See Exhibit C for Breakdown of Fees
37-39 Soledad Street Scope Clarification
This ASR also acknowledges that the design team effort in doing schematic drawings at 37-39 Soledad has exceeded our original understanding of the project in that there is still currently no decision with respect to the program of 39 Soledad: it may be either B occupancy for the whole building and represent minimal plan changes, transform to group/ transitional housing or single family at the second floor, cafe, restaurant or community space at the first floor. We have verbally agreed that the deliverables for that property will now include: 90% SD drawings and one rendering, and will not include Entitlements drawings (these are not required for the purpose of getting a building permit as per a meeting with City officials). A schematic level cost estimate has been added to the scope of work for the approved schematic design scheme. TEF will provide a cost narrative for this effort.

A schematic design scheme has been approved and the design team will proceed to bring the project forward through construction of the building, per the tasks outlined below:
1420 Sutter Street, Floor 2, San Francisco, CA 94109 | TEFarch.com Docusign Envelope ID: D35B3BE8-6C11-45CA-A070-8F3E1C48400A 224 938
60% Construction Document for Building Permit

1. Advance design documentation to 60% Construction Documents Meetings:

1. Bi-weekly call-in meetings with the City, Architect and appropriate AE Team members.

Deliverables:

1. PDF of Ptogress Construction Document Drawings

2. Drawings to include:
i. Title and building code summary sheets;
ii. Site plan
iii. Demolition plans, and demolition elevation(s);
iv. Proposed Floor plans;
v. Building elevations and sections – elevations to include facade repair/restoration notes;
vi. Exterior repair details;
vii. Appropriate exterior and interior detailing
Deliverables Date:

1. Estimated Set Submittal: May, 2026
90% Construction Document for Building Permit

1. Advance design documentation to 90% Construction Documents and Technical Specifications for Building Permit Submittal for City's approval and as bid documents. a. Construction Drawings and Specifications shall be sufficient for construction of the project.

Meetings:

1. Bi-weekly call-in meetings with the City, Architect and appropriate AE Team members.

Deliverables:

1. PDF of Permit Submittal Construction Documents (drawings, technical specifications in CSI format Division 2 through 32, structural calculations) for Building Permit. PDF of 100% Submittal Construction Documents for Building Permit:
b. Drawings to include:
i. Title and building code summary sheets;
ii. Site plan
iii. Demolition plans, and demolition elevation(s);
iv. Proposed Floor plans;
v. Building elevations and sections – elevations to include facade repair/restoration notes;
vi. Exterior repair details;
vii. Appropriate exterior and interior detailing
c. Technical specifications in CSI format Division 2 through 32; i. Division 1 specifications pertaining to historic preservation treatment plans, selective demolition, and building monitoring;
d. Structural calculations

3. Ten copies of Construction Documents for Bidding and make available "camera-ready" PDF copies Deliverables Date:

1. Estimated Building Permit Set Submittal: June, 2026
1420 Sutter Street, Floor 2, San Francisco, CA 94109 | TEFarch.com Docusign Envelope ID: D35B3BE8-6C11-45CA-A070-8F3E1C48400A 225 939
Needed from the City:

1. The City shall provide "front-end" specifications of Project Manual including Instruction to Bidders, Contract, General Conditions and Division 1.

Conformed Set (100% Construction Documents)

1. Meet with City permit review staff as needed to refine plans for resubmittal. Obtain final permit.

2. After receipt of City's approval of Working Drawings, Technical Specifications, and results/changes based on external cost estimate and constructability review, assemble 100 % Final specifications and drawings.

3. Respond to bidders questions, review bidder RFP and attend bid walk.

Meetings:

1. Up to two (2) meetings with Permit Service Center (virtual, 1 hour each)

2. Bi-weekly call-in meetings with the City, Architect and appropriate AE Team members (virtual, 1 hour each)

3. One (1) in-person bid walk
Deliverables:

1. Building Permit Set Resubmittal including Building Department permit comment responses Deliverable Dates:

1. Building Permit Set Resubmittal: TBD.

2. 100% Submittal Construction Documents: TBD
Construction Administration and Project Closeout

1. Support the City and the Contractor in the construction of the project in accordance to the contract documents, schedule and budget; and in the turnover of a complete project. The City shall provide prompt written notice to the Architect if theCity becomes aware of any fault or defect in the project, including errors.

2. Lead the design team and coordinate with the contractor and the City during construction. a. Review General Contractor’s Construction Schedule.
b. Response to field inquiries and RFI’s – Assume 20 RFIs c. Create Architect’s Construction sketches – Assume 10 ASKs and 30 per each consultant d. Review submittals and coordination of reviews by the City – Assume 10 submittals plus (1) resubmittal per each submittal
e. Develop and issue Supplemental Instructions – Assume 10 ASIs f. Review change order proposals and change orders prepared by others.(up to 15) g. Review contractor pay applications (assume 12)
h. Attend monthly project construction meetings. (GC to lead meetings and issue minutes.) i. Perform quality-assurance/field observation walks following regularly scheduled project meetings, and prepare site observation reports – assume 6 reports j. Coordinate code-related changes to the project with the City.

3. Manage the Design Team’s final review and punch list efforts a. Coordinate the design team and perform punch list walks, and issue in writing to GC the observations or corrections required for inclusion in punch list – assume 2 punch lists i. Conduct two rounds of on-site review.
ii. Approve completed punch list.

Meetings:

1. On-site Construction meetings – 6, bi-monthly
1420 Sutter Street, Floor 2, San Francisco, CA 94109 | TEFarch.com Docusign Envelope ID: D35B3BE8-6C11-45CA-A070-8F3E1C48400A 226 940

2. Telephone Construction meetings- 24, every other week except for on-site per above

3. Two site walks total for punch list
Schedule Estimate

1. Construction and construction close-out duration assumed 12 months

ASSUMPTIONS

1. Project drawings will be generated in Revit. Delivery of AutoCAD to the City may be requested but no specific CAD standards are required.

2. All work shall comply with current codes.

3. The Client will provide continuity of staff to serve as the primary contact(s) through the duration of the project.

4. The following are the responsibility of the City:
a. Geotechnical investigation and report including foundation design recommendations and seismic site.
b. Pest and termite inspection and report.
c. Destructive testing.
d. Permit submittal costs

EXCLUSIONS

GENERAL

1. Work related to the investigation or handling of Hazardous Materials

2. Materials testing and inspections or selective demolition

3. Geotechnical Investigations

4. Design or installation of building security systems

5. Meetings and presentations additional to those listed in Scope of Services.

6. Overall project management, including overall project and construction schedule, project budget and project bidding process.

7. Presentation drawings and renderings (of elevations, floor plans and 3-D views), and physical and computerized models (hard copy and/or digital) for the City's use.

8. Phasing plans and strategy.

9. Environmental review, documentation, coordination or completion of required mitigation measures required by Salinas Planning Department, California Environmental Quality Act (CEQA), or National Environmental Protection Act (NEPA) may be completed as an additional service to this proposal.

10. Not responsible for tests, inspections, and reports required by law or the Contract Documents, such as structural, mechanical, and chemical tests, tests for air and water pollution, and tests for hazardous materials.

11. Not responsible for all legal, insurance and accounting services, including auditing services, that may be reasonably necessary at any time for the Project to meet the City’s needs and interests.

12. Energy, comfort (temperature) and thermal computational modeling and related graphic imagery.

13. LEED or any other sustainable design program documentation and submittal for certification..

14. Redraw or redesign due to unforeseen conditions – including unknown site conditions, impact of surrounding project (as identified by City’s approval process), unpredictability of bid climate and escalating construction cost.

15. Emergency generator.

16. Renewable energy such as photovoltaic arrays and systems. 1420 Sutter Street, Floor 2, San Francisco, CA 94109 | TEFarch.com Docusign Envelope ID: D35B3BE8-6C11-45CA-A070-8F3E1C48400A 227 941

17. Front End Documents including the following typically included in a Project Manual: Introductory Information, Bidding Requirements, Instructions to Bidders, Contracting Requirements, Division 1 and Division 2 of the Specifications Sections

18. Special documentation of additive or deductive bid alternates in Construction Documents.

19. Review of bidders’ pre-qualifications.

20. Construction means and methods.

CONSTRUCTION ADMINISTRATION

1. Meetings and presentations additional to those listed in Scope of Services

2. Overall project management and construction management, including overall project and construction schedule, project budget, bidding process and direction to selected general contractor

3. Establishing design criteria for designing or making field observations of shoring for building excavations or underpinning of adjacent structures, or temporary support of building elements during construction.

4. Continuous and/or detailed inspections of construction including Special Inspections as defined in Section 1704 of the California Building Code.

5. Special construction and inspections – Typically conducted by the City’s engineering testing laboratory.

6. Submittal list – Typically prepared by the General Contractor.

7. Construction administration services beyond 12 months

8. Additional RFI or Submittal review beyond the assumptions listed above

9. Prepare Requests for Proposal (RFP)

10. Review proposals prepared by General Contractor

SCHEDULE
Please see attached Exhibit A for revised understanding of schedule as of the writing of this proposal.

CONCLUSION
Please feel free to contact me if you have any questions or comments. If you agree with the terms of this additional service, please prepare a Contract Modification. We look forward to continuing to support San Mateo County with this critical work.

Sincerely,
Maryam Rostami, AIA, NOMA, LEED AP, LFA
Principal Agreed by Date
TEF Architecture & Interior Design, Inc.

ATTACHMENTS:

1. Exhibit A - Schedule Overview

2. Exhibit B - Consultant Proposals

3. Exhibit C - Fee breakdown for 37-39 Rehabilitation Construction Documents 1420 Sutter Street, Floor 2, San Francisco, CA 94109 | TEFarch.com Docusign Envelope ID: D35B3BE8-6C11-45CA-A070-8F3E1C48400A 228 942
EXHIBIT A - Schedule Overview
34-40 Soledad
90% SD - December 23rd
Site Plan Review (Entitlements) Set submission - December 23rd TEF assumes 8 weeks total Planning review time with one round of revisions with completion prior to February 20th.

City Council Design Presentation Material (3 weeks prior to meeting) - January 6th Attendance at City Council meeting - January 27th
45 Soledad - TBD pending redesign
90% SD - Jan 20th
Site Plan Review (Entitlements) Set submission - Jan 20h TEF assumes 8 weeks total Planning review time with one round of revisions with completion prior to February 20th.

City Council Design Presentation Material (3 weeks prior to meeting) - January 20th Attendance at City Council meeting - February 10th
37-39 Soledad HSR (under separate contract)
HSR Findings Client Review meeting - Week of 01/26/26
Submit HSR to Client - 02/10/26
37-39 Soledad Emergency Stabilization (under separate contract) Verify Building Conditions - week of 01/28/26 (pending completion of building cleanup, assumed access to building week of 01/26/26)
Complete 90% CDs - 03/30/26
Submit for Building Permit - 03/30/26
37-39 Soledad Conceptual Design
Present Concept Design Plans and Renderings to Client - week of 12/15/26 Community Presentation - January 2026
90% Schematic Design Schemes (two schemes) - 03/05/26
37-39 Rehabilitation Construction Documents
60% CDs - May 2026
90% / Permit Drawings - June 2026
1420 Sutter Street, Floor 2, San Francisco, CA 94109 | TEFarch.com Docusign Envelope ID: D35B3BE8-6C11-45CA-A070-8F3E1C48400A 229 943

EXHIBIT B - CONSULTANT'S PROPOSALS
Docusign Envelope ID: D35B3BE8-6C11-45CA-A070-8F3E1C48400A 230 944
Docusign Envelope ID: D35B3BE8-6C11-45CA-A070-8F3E1C48400A 231 945
MEP Engineering | Fire/Life Safety | Lighting Design | Energy Consulting | Building Technologies | Commissioning Interface Engineering Inc
1999 Harrison Street, Suite 550
Oakland, CA 94612
TEL 415.489.7240
www.interfaceengineering.com
January 7, 2026
Lindsey Moder
TEF Design
1420 Sutter Street, 2nd Floor
San Francisco, CA 94109
Re: 37-39 Soledad Emergency Stabilization
Professional Services Proposal
Dear Lindsey:

Thank you for the opportunity to provide you with our proposal for the 37-39 Soledad Emergency Stabilization project.

This proposal is based on our Standard Provisions of Agreement for Professional Services, which is attached and incorporated by this reference.

PROJECT DESCRIPTION
Project Owner
City of Salinas
Project Location
37-39 Soledad Street, Salinas, CA 93901
Project Description
The project is the emergency stabilization of the subject property. The property is two adjoining buildings, one two-story and one three-story. Interface’s scope is to provide design-build specifications and submittal reviews for the fire sprinkler system. The existing buildings are not sprinklered.

INFORMATION SOURCE
• Based on RFP/email from Lindsey Moder dated January 5, 2026.

ASSUMPTIONS
Based on our conversation and information received, we understand that this project:
• Will have a single bid/construction packet.
• Will have a single document/construction phase.
• Final bidding and/or GMP of the project will be done after submission of permit and/or issuance of 100 Percent CD.
• Project Funding: We have assumed and understand that funding for this project has been secured or will be in place when project design starts. We have not assumed that payment for services will be held or delayed due to any funding delays or issues.

PROJECT SCHEDULE
This proposal is based on a mutually agreeable schedule.

MEETINGS AND DESIGN SITE VISITS
• Up to two virtual meetings and conference calls.

Docusign Envelope ID: D35B3BE8-6C11-45CA-A070-8F3E1C48400A 232 946
Interface Engineering Inc
37-39 Soledad Emergency Stabilization
January 7, 2026
Professional Services Proposal

Page 2 ends

DESIGN SUBMITTALS
• 90 Percent Construction Documents (Specifications)
• 100 Percent Construction Documents (Specifications)

CONSTRUCTION COSTS
Total Construction Cost is undisclosed.

ENGINEERING SERVICES DESCRIPTION
Our scope of services is limited to the following. Services not included are additional services.

Fire/Life Safety Engineering Services
Fire Protection Sprinkler Services

1. Performance specifications only based on the following. No drawings are included in this approach. a. State and local code requirements.

2. The design will be performed by the contractor. We will review the design for conformance to our specifications.

3. Preliminary sizing of fire main service and coordination with civil engineer. Incoming fire main location shown on civil drawings.

4. Riser location and room size estimate.

5. Determination of need for standpipes.

6. Review of adequacy of water supply for supplying the automatic fire sprinkler systems.

CONSTRUCTION ADMINISTRATION

1. Two reviews of the submittals for each Division are included; additional reviews will be billed at our hourly rates with prior written approval. Fee is based on submittals being provided per Interface standard specifications.

2. Answer RFIs, DCVRs, and construction questions.

3. Issue of ASIs, change orders, plan revisions, etc. generated by others is not included. Additional fees will be submitted for prior approval for these services.

4. Review of change order costs initiated by others is not included.

EXCLUSIONS

1. Attendance at prebid and preconstruction meetings.

2. Construction observation site visits.

3. Construction record drawings.

4. Shop drawings, fabrication drawings, and construction coordination drawings.

5. Structural calculations for the seismic restraint and anchorage of equipment.

6. Waterproofing details/requirements for building components.

7. Commissioning of systems.

8. Commissioning participation.

Docusign Envelope ID: D35B3BE8-6C11-45CA-A070-8F3E1C48400A 233 947
Interface Engineering Inc
37-39 Soledad Emergency Stabilization
January 7, 2026
Professional Services Proposal

Page 3 ends

FEE
Fixed Fee
Project Phase
Fire/Life
Safety
Construction Documents $3,200
Construction Administration $1,800
Discipline Totals $5,000
Total Fee: $5,000
*Plus reimbursable expenses noted below.

PAYMENT TERMS
Standard reimbursable expenses include, but are not limited to: final plots, project mileage to jobsite or meeting locations, parking, shipping, and messenger services.

Billed in addition to the above fee at cost plus 10 percent processing fee.

We will bill fees and reimbursable expenses monthly as services are performed. Payment is due within 60 days of receipt of invoice. Finance charges may be added after that time at a rate of 1.5 percent per month (annual rate of 18 percent). Finance charges will be applied to delayed payments resulting from lack of project funding. Upon aging of fees and reimbursable expenses beyond 90 days, Interface reserves the right to meet with Architect and holder of Prime Contract to determine resolution prior to continuation of services.

This proposal is valid for 90 days from the date first written above. Interface Engineering Inc (Interface) reserves the right to modify or update this proposal after that date.

ADDITIONAL SERVICES
Services requested beyond those included in this proposal will be considered extra services and will be billed either at hourly rates listed below or will be estimated on a lump sum basis. Interface may decline to perform additional work until authorization is received in writing.

Additional services will be billed at our standard hourly rates at the time the work is performed*. Our current standard hourly rates (2026) are:

Senior Principal: $385/Hour
Principal: $335/Hour
Associate Principal: $280/Hour
Associate/Project Manager: $265/Hour
Sr. Engineer-Designer: $235/Hour
Engineer-Designer: $195/Hour
Project Designer-Drafter: $175/Hour
Administrative: $145/Hour
*Annual rate changes are expected to be 4% per year.

Docusign Envelope ID: D35B3BE8-6C11-45CA-A070-8F3E1C48400A 234 948
Interface Engineering Inc
37-39 Soledad Emergency Stabilization
January 7, 2026
Professional Services Proposal

Page 4 ends

DESIGN-BUILD SERVICES
If design-build services are provided, Client acknowledges that Interface will provide performance specifications. In the event that drawings are provided, they will be conceptual drawings only. Conceptual drawings and performance specifications are intended as guidelines for the design of system(s) by the design-build contractor. Conceptual drawings and performance specifications are not intended for use to obtain a building permit or as bid documents. The design-build contractor is responsible for complete design, engineering, permit documents, construction documents, and coordination with architectural, all trades and utilities, and governing jurisdictions and licensing agencies. The design-build contractor is responsible for system quantities, capacities, routing, and installation adequate for its intended use. All detailing by design builder. Client agrees that Interface is not responsible for the design and will indemnify and hold harmless Interface for any and all claims, damages, allegations, and costs, including attorneys' fees at trial, arbitration and on appeal, arising out of the design and installation of design-build systems.

Client acknowledges that Interface's review of submittals by design-build contractor is for the limited purpose of checking for conformance with the performance concept expressed in the contract documents. Interface's review does not constitute approval of safety precautions, means and methods, approval of an assembly, or approval of a component.

Attached is our Standard Provisions of Agreement for Professional Services. If this Proposal and the Standard Provisions of Agreement meet with your approval, please sign below, initial the Standard Provisions, and return to us. By your signature, you acknowledge that you have read the Standard Provisions of Agreement and that you read and agree to the Limitation of Liability paragraph. We will not proceed with the work until this signed Agreement is returned to us. In addition, you represent that you have authority to bind TEF Design. If you have modified this proposal, we will review your modifications.

This Agreement shall not be in effect until we sign, accepting your modifications.

Docusign Envelope ID: D35B3BE8-6C11-45CA-A070-8F3E1C48400A 235 949
Interface Engineering Inc
37-39 Soledad Emergency Stabilization
January 7, 2026
Professional Services Proposal

Page 5 ends

If you have any questions, please contact this office.

Sincerely,
Wesley Lau, PE, LEED AP
Principal
WL:ah
Enclosures: Standard Provisions
COMPANY: TEF Design
CONTACT: _____________________________________ ______________________________ Lindsey Moder, Associate Date
L:\Opportunities\2026\TEF Design\37-39 Soledad Emergency Stabilization\Fee Proposal\20260108FP - 37-39 Soledad Emergency Stabilization.docx
Docusign Envelope ID: D35B3BE8-6C11-45CA-A070-8F3E1C48400A 236 950
MEP Engineering | Fire/Life Safety | Lighting Design | Energy Consulting | Building Technologies | Commissioning Interface Engineering, Inc
49 Stevenson Street, Suite 660
San Francisco, CA 94105
TEL 415.489.7240
www.interfaceengineering.com
January 7, 2026
Lindsey Moder
TEF Design
1420 Sutter Street, 2nd Floor
San Francisco, CA 94109
Re: 37-39 Soledad Rehabilitation
Professional Services Proposal
Dear Lindsey:

Thank you for the opportunity to provide you with our proposal for the 37-39 Soledad Rehabilitation project.

This proposal is based on our Standard Provisions of Agreement for Professional Services, which is attached and incorporated by this reference.

PROJECT DESCRIPTION
Project Owner
City of Salinas
Project Location
37-39 Soledad Street, Salinas, CA 93901
Project Description
The project is the rehabilitation and renovation of the subject property. 37 Soledad is currently programmed for the Asian Cultural Experience of Salinas Museum on the first floor, mezzanine, rear of second floor, and third floor; the second floor is programmed for a single 2-bedroom apartment unit. 39 Soledad is current programmed for a commercial space with a bar (no commercial cooking) on the first floor and a commercial/retail cold shell on the second floor. The buildings have been vacant for some time and has no active utility services.

The MEP scope will be to provide a cold dark shell space, which includes a new electrical service, new domestic water and sanitary sewer services stubbed and capped at the interior, and code-required fire alarm and fire sprinkler systems. We will provide plumbing connections for the fixtures in the apartment kitchen and bathroom.

Sustainable Design Requirements
Project is not anticipated to pursue LEED® certification or any other third-party green building certifications/incentive programs. We will include energy efficiency designs where feasible and cost effective.

INFORMATION SOURCE
• Based on RFP/email from Lindsey Moder dated January 5, 2026.

Docusign Envelope ID: D35B3BE8-6C11-45CA-A070-8F3E1C48400A 237 951
Interface Engineering, Inc
37-39 Soledad Rehabilitation
January 7, 2026
Professional Services Proposal

Page 2 ends

ASSUMPTIONS
Based on our conversation and information received, we understand that this project:
• Will have a single bid/construction packet.
• Will have a single document/construction phase.
• Is shell only with no tenant improvement.
• Final bidding and/or GMP of the project will be done after submission of permit and/or issuance of 100 Percent CD.
• Project will be developed as a Revit model to meet Level of Development 300 and Clash Classification as outlined in the attached Revit Deliverables document. • Project will not be a LEED® project.
• Project Funding: We have assumed and understand that funding for this project has been secured or will be in place when project design starts. We have not assumed that payment for services will be held or delayed due to any funding delays or issues.

PROJECT SCHEDULE
This proposal is based on a mutually agreeable schedule.

MEETINGS AND DESIGN SITE VISITS
• Virtual meetings and conference calls with architect and design team as required. • One Client Review meeting at 60% submittal.

DESIGN SUBMITTALS
• 60 Percent Construction Documents, (CD Drawings and Specifications) • 90 Percent Construction Documents (CD Drawings and Specifications) • 100 Percent Construction Documents/Permit (CD Drawings, Specifications and Code Forms)

CONSTRUCTION COSTS
Total Construction Cost is undisclosed.

ENGINEERING SERVICES DESCRIPTION
Our scope of services is limited to the following. Services not included are additional services.

Plumbing Engineering Services
Plumbing Systems

1. We have assumed that there are no existing plumbing systems within the buildings and all systems will be new.

2. Sanitary drainage, domestic water design from 5 feet outside each building, stubbed and capped at the interior.

3. Plumbing connections (no fixtures or fixture specifications) in the apartment kitchen and bathroom.

Docusign Envelope ID: D35B3BE8-6C11-45CA-A070-8F3E1C48400A 238 952
Interface Engineering, Inc
37-39 Soledad Rehabilitation
January 7, 2026
Professional Services Proposal

Page 3 ends

Electrical Engineering Services
Electrical Utilities Coordination

1. We have assumed that there are no existing electrical systems within the buildings and all systems will be new.

2. Power Utility: revenue meter location/requirements, transformer pad location (if applicable).

Building Power Distribution

1. Building power distribution design. Design of incoming power with termination at main distribution panel.

2. Egress lighting design and illuminated exit sign placement design per CBC requirements, based on a complete and comprehensive egress plan provided by Architect, indicating occupant load calculations and designated egress paths and exit sign locations.

3. Design of code-required emergency and egress lighting using unit battery equipment as the backup source.

Fire/Life Safety Engineering Services (OPTIONAL SERVICE) Fire Protection Sprinkler Services

1. Performance specifications only based on the following. No drawings are included in this approach. a. State and local code requirements.

2. The design will be performed by the contractor. We will review the design for conformance to our specifications.

3. Preliminary sizing of fire main service and coordination with civil engineer. Incoming fire main location shown on plumbing drawings.

4. Riser location and room size estimate.

5. Determination of need for standpipes.

6. Review of adequacy of water supply for supplying the automatic fire sprinkler systems.

Fire Detection and Alarm Services

1. Performance specification only based on the following. No device drawings. a. State and local code requirements.

2. The design will be performed by the contractor. We will review the design for conformance to our specifications.

Prescriptive Envelope Compliance Documentation (OPTIONAL SERVICE)

1. Provide guidance on envelope performance requirements per Title 24-2025 (preliminary guidance document provided upon review of design documents).

2. Provide Prescriptive energy analysis to meet California Title 24-2025.

3. Document and submit analysis results for permit.

4. Respond to city comments.

Docusign Envelope ID: D35B3BE8-6C11-45CA-A070-8F3E1C48400A 239 953
Interface Engineering, Inc
37-39 Soledad Rehabilitation
January 7, 2026
Professional Services Proposal

Page 4 ends

BIDDING/NEGOTIATIONS AND PERMITTING

1. Answer questions during bidding phase.

2. Issue addenda as may be required under the original design scope during the bidding phase.

3. Review of substitution requests. Maximum of two reviews per vendor.

4. Respond to jurisdiction permit comments and issue addenda as required to address comments.

Maximum of two responses and addenda issuances. Meetings with code officials can be provided as a supplemental service.

CONSTRUCTION ADMINISTRATION

1. Two reviews of the submittals for each Division are included; additional reviews will be billed at our hourly rates with prior written approval. Fee is based on submittals being provided per Interface standard specifications.

2. Answer RFIs, DCVRs, and construction questions.

3. Issue of ASIs, change orders, plan revisions, etc. generated by others is not included. Additional fees will be submitted for prior approval for these services.

4. Review of change order costs initiated by others is not included.

EXCLUSIONS

1. Substantial cost reduction requiring redesign after 60% Design.

2. Redesign work associated with substantial floor plan changes after 60% Design.

3. Changes to the MEP design related to change orders initiated by others, supply chain issues, ASIs, and/or value engineering.

4. Construction cost estimates. We will review cost estimator’s pricing and provide comments.

5. Life cycle cost analysis for electrical systems.

6. Attendance at prebid and preconstruction meetings.

7. Construction record drawings.

8. Shop drawings, fabrication drawings, and construction coordination drawings.

9. Structural calculations for the seismic restraint and anchorage of equipment.

10. Design of temporary power for construction.

11. Design of building footing drainage and/or sub-slab groundwater drainage.

12. Radon system design.

13. Waterproofing details/requirements for building components.

14. Acoustical analysis, design of noise attenuation requirements, and special vibration isolation requirements for mechanical systems. We will include modifications to our systems per your acoustical consultants’ recommendations within our base fee.

15. Determination/interpretation of egress lighting paths with local officials.

16. Work associated with public street lighting or power design.

17. Commissioning of systems.

18. Commissioning participation.

19. Lightning protection system design.

20. Project related services associated with LEED and/or other third-party Green Building Certification.

21. Project related services associated with utility incentives, including energy modeling for custom track incentives, charrettes and incentive documentation.

22. Mechanical system design.

23. Information and Communications Technology (ICT) system design.

Docusign Envelope ID: D35B3BE8-6C11-45CA-A070-8F3E1C48400A 240 954
Interface Engineering, Inc
37-39 Soledad Rehabilitation
January 7, 2026
Professional Services Proposal

Page 5 ends

FEE
Fixed Fee
Project Phase
Plumbing
Engineering
Electrical
Engineering Phase Totals
Construction Documents $9,100 $11,100 $20,200
Bid/Negotiation and Permitting $1,100 $1,300 $2,400
Construction Administration $2,600 $3,100 $5,700
Discipline Totals $12,800 $15,500 $28,300
Total Fee: $28,300
*Plus reimbursable expenses noted below.

OPTIONAL SERVICES (ADDITIVE)
Project Phase Fee Client Initials
Fire/Life Safety Engineering Services $7,000
Prescriptive Envelope Compliance Documentation $6,000
Site visit conducted on an as-requested basis. Cost per person and per site visit. $2,000

PAYMENT TERMS
Standard reimbursable expenses include, but are not limited to: final plots, project mileage to jobsite or meeting locations, parking, shipping, and messenger services.

Billed in addition to the above fee at cost plus 10 percent processing fee.

We will bill fees and reimbursable expenses monthly as services are performed. Payment is due within 60 days of receipt of invoice. Finance charges may be added after that time at a rate of 1.5 percent per month (annual rate of 18 percent). Finance charges will be applied to delayed payments resulting from lack of project funding. Upon aging of fees and reimbursable expenses beyond 90 days, Interface reserves the right to meet with Architect and holder of Prime Contract to determine resolution prior to continuation of services.

This proposal is valid for 90 days from the date first written above. Interface Engineering, Inc (Interface) reserves the right to modify or update this proposal after that date.

Docusign Envelope ID: D35B3BE8-6C11-45CA-A070-8F3E1C48400A 241 955
Interface Engineering, Inc
37-39 Soledad Rehabilitation
January 7, 2026
Professional Services Proposal

Page 6 ends

ADDITIONAL SERVICES
Services requested beyond those included in this proposal will be considered extra services and will be billed either at hourly rates listed below or will be estimated on a lump sum basis. Interface may decline to perform additional work until authorization is received in writing.

Additional services will be billed at our standard hourly rates at the time the work is performed*. Our current standard hourly rates (2026) are:

Senior Principal: $385/Hour
Principal: $335/Hour
Associate Principal: $280/Hour
Associate/Project Manager: $265/Hour
Sr. Engineer-Designer: $235/Hour
Engineer-Designer: $195/Hour
Project Designer-Drafter: $175/Hour
Administrative: $145/Hour
*Annual rate changes are expected to be 4% per year.

DESIGN-BUILD SERVICES
If design-build services are provided, Client acknowledges that Interface will provide performance specifications. In the event that drawings are provided, they will be conceptual drawings only. Conceptual drawings and performance specifications are intended as guidelines for the design of system(s) by the design-build contractor. Conceptual drawings and performance specifications are not intended for use to obtain a building permit or as bid documents. The design-build contractor is responsible for complete design, engineering, permit documents, construction documents, and coordination with architectural, all trades and utilities, and governing jurisdictions and licensing agencies. The design-build contractor is responsible for system quantities, capacities, routing, and installation adequate for its intended use. All detailing by design builder. Client agrees that Interface is not responsible for the design and will indemnify and hold harmless Interface for any and all claims, damages, allegations, and costs, including attorneys' fees at trial, arbitration and on appeal, arising out of the design and installation of design-build systems.

Client acknowledges that Interface's review of submittals by design-build contractor is for the limited purpose of checking for conformance with the performance concept expressed in the contract documents. Interface's review does not constitute approval of safety precautions, means and methods, approval of an assembly, or approval of a component.

Attached is our Standard Provisions of Agreement for Professional Services. If this Proposal and the Standard Provisions of Agreement meet with your approval, please sign below, initial the Standard Provisions, and return to us. By your signature, you acknowledge that you have read the Standard Provisions of Agreement and that you read and agree to the Limitation of Liability paragraph. We will not proceed with the work until this signed Agreement is returned to us. In addition, you represent that you have authority to bind TEF Design. If you have modified this proposal, we will review your modifications.

This Agreement shall not be in effect until we sign, accepting your modifications.

Docusign Envelope ID: D35B3BE8-6C11-45CA-A070-8F3E1C48400A 242 956
Interface Engineering, Inc
37-39 Soledad Rehabilitation
January 7, 2026
Professional Services Proposal

Page 7 ends

If you have any questions, please contact this office.

Sincerely,
Wesley Lau, PE, LEED AP
Principal
WL:ah
Enclosures: Standard Provisions; Revit Deliverables
COMPANY: TEF Design
CONTACT: _____________________________________ ______________________________ Lindsey Moder, Associate Date
L:\Opportunities\2026\TEF Design\37-39 Soledad Rehabilitation\Fee Proposal\20260107FP - 37-39 Soledad Rehabilitation.docx Docusign Envelope ID: D35B3BE8-6C11-45CA-A070-8F3E1C48400A 243 957
Project Management | Construction Cost Management
2063 Grant Rd.

Los Altos, CA, 94024
Tel: 415.981.9430
Our ref.: DB-01
January 8, 2026
Maryam Rostami
TEF Design
1420 Sutter Street, 2nd Floor
San Francisco, CA 94109
Re: Fee Proposal – Cost Estimating Services for Renovations: 37-39 Soledad Street Project in Salinas, CA (Rev 1)
Dear Maryam,
Further to your email, we are pleased to offer Cost Estimating services for the above project.

Scope of Services
We understand the scope of our services is to prepare cost estimates per following:
• Asian Cultural Experience of Salinas Museum at first floor, mezzanine, rear of second floor, and third floor
• Single Apartment unit at the existing second floor unit; Commercial space at First Floor (rear one story building to be demolished), and open cold shell at second story
• Limited structural work; New utility services (water, electrical); some MEP work.

The estimate will be based on the measurements of quantities from the drawings with composite unit rates reflecting the scope of work and the current market conditions. We will not obtain any bids or opinions of cost from subcontractors unless the work is of such a unique nature that no other cost information is available. No bids or third-party opinions will be obtained without prior approval from the client.

We have included time required to review and discuss our cost estimate with the Design Team and for incorporating any requested revision to the estimate as a result of the Design Team review. We have excluded any time required to reconcile our estimate with another cost estimate prepared by others. We have also excluded time required to attend any meetings or any Value Engineering cost services from this proposal. Should additional work be required, our standard hourly rate of $255 per hour will apply.

Fees
We propose to provide the above services based on the following Fees – Docusign Envelope ID: D35B3BE8-6C11-45CA-A070-8F3E1C48400A 244 958

Project Management | Construction Cost Management
100% SD Cost Estimate (80hrs, $255/hr.) $ 20,400
Total Fees $ 20,400
Expenses such as drawing reproduction, courier services, special mailing services (Federal Express, Express Mail etc.), and other abnormal costs are excluded and will be charged at cost plus 0% administration.

Our fees exclude travel costs outside the San Francisco Bay Area, any such travel costs as incurred will be billed separately.

Payment and Terms
We will issue a monthly invoice. Payment will be due thirty (30) calendar days.

Our proposal remains open for a period of ninety (90) days. After this time, we will be pleased to review the proposal, make any required amendments, and re-submit for your review and approval.

Work will be completed under the direction of Deo Bhalotia.

We trust that we have interpreted your requirements correctly, if you have any questions or suggested amendments, please do not hesitate to contact the undersigned. If you would like to proceed with the above services, please complete and return the authorization below.

We look forward to working with you on this project.

On behalf of TBD Consultants On behalf of TEF Design
_______________________________ Accepted by: _________________________ Deo Bhalotia
Associate Principal Date:
_________________________
Title: _________________________
Docusign Envelope ID: D35B3BE8-6C11-45CA-A070-8F3E1C48400A 245 959
 




  

!"

!#$%&' !
('
&' ) *+&
,-
"
'./01234567895:;<=>83? @94ABC:;BDABEFEGB:HBIJEEBKL M8JBN4;<O26BL8<29B.54;<O261H2P:9>Q=>83? R>JBL:96:3BS8OH:34B.3:96:31H2P:9>Q=>83? T4BN4;<O26A B U>8V2W=B/XH29489BY9>Q4H2>HZ9:5BOV2>OB[B92Q:7BOV2>OB\]4HQBN4;<O26^OB:OO4OH:;>2_AB4;>5Z<4;`B]:H29V988P4;`BOV2>O= E=Ba;H29489BUV2>OJBY9>Q4H2>HZ9:5BOV2>OBP89BIDBU852<:<B7:9B92OH89:H48;bB:9>Q4H2>HZ9:5BOV2>OBP89B]Q4H2B>85< OQ255O= I=BS88PBc89dB4OB2X>5Z<2<= e=Bf2;29:5BR8;<4H48;OB:;<BS2gZ49232;HOB\h4i=BFW_B:92B2X>5Z<2<= j=BDFkBRhOJBh9:PHB:;<B@4;:5BUV2>O=BB/0UB]455B>83V452B>8;OZ5H:;HBOV2>OBH8BP893B:BV98l2>HB3:;Z:5A 4;>5Z<4;`B:BH:752B8PB>8;H2;HO= G=B@22JBmWGAWIF mDAEeFBP89BHQ2B<9:PHBOV2> mjAWnFBP89BHQ2BP4;:5BOV2> mWADGFB:558]:;>2oQ8Z956B9:H2B8PBmEejoQ9B\nBQ9O_BH8B:;O]29BgZ2OH48;OoZV<:H2BOV2>OB<Z94;`B74<<4;`oRY B K52:O2B52HB32Bd;8]B4PB68ZBQ:i2B:;6BgZ2OH48;O= B
MQ:;dOAB/3456 B
pqrstuvwxsyz{|u}"&'~&

~&€&
" ‚#$ƒ#$$#$„
#†**„‚}#$ƒ} pqrstuvwxsyz{u‡ˆ‰Šr‹rŠyŒrwz|uŽzŠ ‘’“”•–—˜™•š›œ‘˜“ }% '
žŸ ¡¢ ¢Ÿ£££ 
pv‡u¤‰xŒr‹rŠyŒrwz¥ ¦-*§¨&~"
†-*# '©" '~&)~
$¨„ -ª¨&~"
«§-}¬­
&~¦
"®)#$‚„¯ 
WoDoEGABeJFFBKL M/@BY9>Q4H2>HZ92B°Ba;H29489Bh2O4`;BL:45B±BI²±IDBU852<:<BUH922HABRQ4;:H8];BU:54;:O QHHVOJoo3:45=`88`52=>83o3:45oZoFo³4d´7WEn2<F²Pe[i42]´VH[O2:9>Q´:55[V2933O`4<´3O`±PJWnjInnII²DneGEWIFej[O43V5´3O`±PJWnjInnII²DneGEWIFej Woj Docusign Envelope ID: D35B3BE8-6C11-45CA-A070-8F3E1C48400A 246 960

BKF ENGINEERS
255 Shoreline Drive, Suite 200, Redwood City, CA 94065 | 650.482.6300 January 7, 2026
BKF No: 20250631
Ms. Lindsey Moder
TEF Design
1420 Sutter Street, 2nd Floor
San Francisco CA 94109
Transmitted via email [email protected]
Subject: 37-39 Soledad Street, Salinas
Civil Engineering Proposal
Dear Ms. Moder:

BKF Engineers welcomes the opportunity to submit this proposal for civil engineering services associated with the mixed-use project located at 37-39 Soledad Street in the City of Salinas, California. To arrive at the estimated effort required by our office for this project, we have outlined a proposed scope of services, identified assumptions, and determined a level of effort fee based on our understanding of the project.

PROJECT UNDERSTANDING
Based on your proposal request and information obtained, we understand the project as follows:

The project proposes to construct Asian Cultural Experience of Salinas Museum at 37 Soledad St first floor, mezzanine, rear of second floor, and third floor. A single apartment unit is proposed at the existing second floor unit. A commercial space is proposed at 39 Soledad Street first floor (rear one story building to be demolished). Open cold shell is currently proposed at the second story.

At the time of proposal, no proposed floor plans were provided.

BKF’s scope is limited to Civil Engineering services including grading, utility connections and erosion control. These will all be completed to a construction document level suitable for City permits and construction. As this is an internal remodel, we have excluded stormwater programming scope from this project.

This proposal assumes that public improvements along the project frontages will be limited to new sidewalks, curb & gutter, driveways, and utility service laterals.

BASIS OF DESIGN
Our proposal is based on the following:

1. 37 Soledad Street survey by BKF Engineers, dated September 9th, 2025

2. 45 Soledad Street survey by BKF Engineers, dated March 18th, 2025 Docusign Envelope ID: D35B3BE8-6C11-45CA-A070-8F3E1C48400A 247 961

Page 2 of 6 ends

SCOPE OF SERVICES
TASK 1: CONSTRUCTION DOCUMENTS

1. Existing Conditions Review: BKF will review the existing site constraints and conditions. We will note any potential challenges to development to support the planning and permit processes.

2. Project Coordination: BKF will coordinate with the Architect and the design team regarding design concepts and electronic data exchange associated with the Permit Phase. Civil documents will be based on the digital site plan and building footprints provided by the Architect.

3. Drawings: We will be sure to prepare all civil-related items listed in the City’s submittal checklist. The following plans will be prepared for the permit submittal:
a. Civil Cover Sheet
b. Notes & Legend
c. Existing Conditions
d. Public Frontage Improvements
e. Utility Plan
f. Construction Details
g. Sedimentation and Erosion Control Plan.

4. Design Calculations: BKF does not expect any calculations to be required for our scope.

5. Specifications: BKF will prepare technical specifications in CSI format for elements included in our scope of work.

6. Meetings: BKF has budgeted up to a maximum of sixteen (16) combined staff hours to attend meetings and participate in conference calls during the construction documents phase. Anticipated meetings include City coordination and internal coordination including a Client Review Meeting at 60% submittal. Attendance at formal hearings such as Planning Commission, City Council, would be considered as additional services and not part the scope and fee provided.

7. Submittals: BKF will provide Construction Document submittals at the 60%, 90% and 100% level of completion. We have not included time for additional intermediate coordination sets with this phase of the project. We have assumed that the 90% set will be used for the initial permit submittal. We have included a separate submittal to Cal Water in this scope

8. Project Approval: BKF will update the drawings based on agency comments and re-submit for review. We have allocated fee for up to twenty (20) combined staff hours to address minor comments that do not change the design of the civil improvements or site plan. We have assumed that no more than two plan submittals will be needed and that the agency will not be utilizing third party plan reviewers.

TASK 2: BIDDING AND CONSTRUCTION SUPPORT

1. Bidding Support: We will assist the owner with the project bidding process. This includes attending answering questions during the bidding period. BKF has allocated up to a maximum of four (4) hours of combined staff time to support the project team during the bidding phase.

2. Construction Support: BKF has allocated up to a maximum of sixteen (16) hours of combined staff time to support the contractor and design team during the construction phase of the project. Anticipated services Docusign Envelope ID: D35B3BE8-6C11-45CA-A070-8F3E1C48400A 248 962

Page 3 of 6 ends

include written response to requests for information (RFI's), submittal reviews, substitution requests, informational bulletins, attending pre-construction meetings, site visits to provide clarification of the consultant's design intent for the contractor, Architect or owner, stormwater facility construction observations, punch list walks, and record drawings. This does not include work (site visit, design, and permitting) related to field changes needed to address unknown or unforeseen conditions or changes to the design based on the contractor’s sequencing design.

SCOPE QUALIFICATIONS AND ASSUMPTIONS
BKF Engineers' services are limited to those expressly set forth in the scope. We understand that BKF will have no other obligations or responsibilities for the project except as provided in this proposal letter, or as otherwise agreed to in writing. BKF will provide the scope of services consistent with, and limited to, the standard of care applicable to such services. Any participation in non-adversarial procedures, or other right to repair items, is considered as additional services. For the scope of work identified, we have assumed the following:
1) Basis of Design and Site Information
a) Topographic Survey: The survey completed by BKF in September 2025 will be utilized for our civil engineering design.
b) Title Report: A current title report for the property will be provided by the owner. c) Geotechnical Report: A geotechnical report for the project will be provided. At a minimum, this report should address the required paving structural sections, earthwork and compaction recommendations, soil bearing pressures, surcharge pressures, settlement issues, soil infiltration/percolation rates, groundwater levels, and corrosion recommendations.
d) Existing Utilities: Unless otherwise indicated or provided by others, any existing utilities identified on BKF's drawings/plans are based on information obtained by BKF, or provided to BKF, and may not be accurately documented in their horizontal location or vertical profile. Other utilities may be present that were not disclosed. BKF highly recommends that critical facilities be underground service alert (USA) located and potholed during design or prior to construction.
e) Potholing: Potholing services are not included in this proposal unless specifically identified. f) Existing Utility Capacities: Unless otherwise addressed, existing utilities have adequate capacity to serve the proposed improvements, that they are adjacent to the site frontage and do not require main extensions, and that utility system capacity studies are not required.
2) Responsibilities
a) Civil Engineering Scope Items: BKF's design tasks are limited to civil work outside of the structure(s) and utility connections 5-feet outside of the structure(s) including: site grading, non-structural concrete pavement, concrete sidewalks, concrete curbs and gutters, asphalt pavement, storm drainage, wastewater, and domestic water/fire water design.
b) Architect: The Architect will be responsible for the overall site plan including accessible routes of travel, details of site accessibility signage, parking counts, site coverage calculations, trash areas/enclosures, fencing and walls. A site plan will be provided by the Architect prior to our beginning design. All work within the building (including any podium, porches, garages, or ramps) will be the Architect's scope of work. c) Site Dry Utilities: All electric, gas, communications, and lighting improvements will be designed by others, unless specifically included in the civil scope of work.

Docusign Envelope ID: D35B3BE8-6C11-45CA-A070-8F3E1C48400A 249 963

Page 4 of 6 ends

d) Fire System: Certification of the fire protection system from the point of connection at the public water main to the building sprinkler system must be provided by a properly-licensed fire protection engineer or contractor.
e) Site Landscape/Irrigation: The landscape architect will provide landscape, irrigation design, and layout and details of walks, plazas, trails, entry monuments, walls, and/or fences. The architect and landscape architect will lead the design development efforts for the design, grading, and detailing of interior courtyards, plaza areas, hardscape and landscape areas.
f) Structural Details: Structural calculations, design, and details for such items as reinforced concrete slabs, foundations, pads, vaults, footings, ramps, stairs, sound/site walls, and/or retaining walls will be provided by others. This includes structural design and detailing for storm water treatment elements that retain ground, parking, or buildings foundations.
g) Mechanical, Electrical and Plumbing (MEP): All site HVAC, power, gas, communications, and low voltage improvements, and existing water pressures will be coordinated, designed, and documented by others. MEP will also provide preliminary fire service sizing based on the California Plumbing and Fire Code requirements and provide fire service lateral locations and sizes to BKF. h) Joint Trench Design: Services to the buildings, main extensions, and/or relocation of existing 'dry' utilities (gas, electric, communication, fiber, etc.) will be led by the joint trench/electrical designers unless otherwise contracted. Any utility relocation/abandonment required is assumed to be coordinated and processed by the Joint Trench Consultant. Dry utilities designed by the joint trench consultant will be shown for coordination purposes only on the civil plans.
i) Lighting Design & Photometric Analysis: Lighting design and photometric analysis for the site and public roadways will be provided by others.
j) Traffic Signal Design: Design or modification of traffic signals is not currently included in our scope of work.

BKF can provide these services if the City conditions these improvements to the project. k) Water Design: Proposal assumes that the project will require new water services for domestic, irrigation, and fire. We have not allocated budget to install public or private fire loops within the development or main extensions within the public right of way.
l) Mapping: We have not included time to prepare additional items not contained in the mapping scope of work. Additional mapping services such as subdivision maps, private easement documents, quit claims, ALTA's, right of way dedications, etc. not specifically listed in this proposal are not included. m) Cost Estimating: All cost estimating will be provided by a project estimator. BKF will review the cost estimates for general consistency with the plans.
n) Pump Stations: Pump station design (electrical, mechanical, plumbing, and sitework) is not included in the basic scope of services. We can provide pump station design service as an additional scope item at your request.
o) Earthwork: We do not expect to provide any earthwork calculations.

Docusign Envelope ID: D35B3BE8-6C11-45CA-A070-8F3E1C48400A 250 964

Page 5 of 6 ends

3) CEQA, Entitlement, and Off-Site Improvements/Studies a) CEQA/EIR Consulting: Some jurisdictions allow project sponsors to provide technical studies to support the CEQA document and review by the sponsor of the administrative draft document. We have not included time for assisting in this effort. Should this be requested, we can provide a separate scope to support this effort. b) Off-Site Improvements: Off-site improvements are limited to designing new curb cuts along the project frontage and construction of new curb, gutter, sidewalk, and utility services to the public mains within the fronting public roads. If additional off-site improvements are subsequently required, we will notify you of the change in scope and provide an additional service request to cover the new scope. 4) Meetings
Meetings: Meetings are assumed to be held in the Bay Area or via remote conference. Meeting time requested beyond what we have budgeted is not included in this proposal. 5) Phasing, Delivery and Deliverables
a) Phasing: The project will be permitted and constructed in one phase and that construction phasing plan(s), or interim condition plans, will not be required for this project. Proposal does not include preparing and processing split construction permits for demolition, rough grading, backbone utilities, etc. b) Submittals: All submittals, and the coordination thereof, will be facilitated by the lead consultant and /or owner representative.

c) Permits: Unless otherwise specifically delineated in the scope of services, permit processing, applications, fees, and submittals to local, state, and federal agencies and utility purveyors will be provided by others. BKF will submit to the client delineated scope deliverables for client submission to governing agencies. d) Drawings: All drawings will be prepared in AutoCAD format. We will submit copies of all drawings in both electronic and paper format.
e) Building Information Modeling (BIM): We have not included time to convert civil 3D design or existing conditions AutoCAD files into BIM model files. We have assumed all conversions will be by the Architect.

Docusign Envelope ID: D35B3BE8-6C11-45CA-A070-8F3E1C48400A 251 965

Page 6 of 6 ends

COMPENSATION
BKF proposes to provide the services on a lump sum basis. We will invoice for our services on a percent complete basis per task summarized as follows:

Task Description Fee
1 Construction Documents $25,500
2 Bidding and Construction Support $5,200
Total Fee $30,700
Reimbursable expenses are anticipated for reproduction, mileage, express and messenger deliveries, and computer deliverable plots. Reimbursable expenses will be billed on a cost plus 10-percent markup basis.

For tasks requested by the owner or Architect not defined in this scope of services, BKF will identify them as potential extra work. We can provide a scope and fee for these items or they may be tracked separately as extra work and billed on a time and materials per our attached rate schedule.

Thank you for the opportunity to present this proposal. We look forward to assisting in developing this project. Please contact me at 650-482-6475 if you have any questions regarding our scope of services.

Respectfully,
BKF Engineers
Craig Smith, PE, QSD Jonathan Tang, PE
Project Manager Associate Principal
Docusign Envelope ID: D35B3BE8-6C11-45CA-A070-8F3E1C48400A 252 966
January 9, 2026
Maryam Rostami
TEF Design
1420 Sutter Street
San Francisco, CA 94109
Re: 37-39 Soledad Street Rehabilitation
37-39 Soledad Street
Salinas, CA 93901
Job No. 2024.294.01
Dear Maryam,
Thank you for considering Tipping for the proposed rehabilitation of 37-39 Soledad Street in the historic Chinatown district of Salinas. We are delighted to work with you on this important renovation.

We have worked with your office under a separate agreement to provide structural content for a Historic Structures Report and structural design work for stabilization work of the existing building.

This proposal is related to a separate but related scope of work to design interior renovations for new programming at the building as part of its adaptive reuse plans.

The existing site includes two adjoining buildings constructed in 1942, each two-stories tall and totaling approximately 9,431 square feet of interior space. 37 Soledad Street, also known as the Republic Cafe, is on the National Register of Historic Places and recognized by the State of California as a historic building. A fire in October of 2022, along with much deferred maintenance, has rendered the wood-framed buildings uninhabitable. The building shell, including the primary structure, will be improved as part of the separate stabilization project. The proposed program for the interior rehabilitation improvements includes the following:
37 Soledad:
• Asian Cultural Experience of Salinas Museum at first floor, mezzanine, rear of second floor, and third floor.
• A single apartment unit at the existing second floor unit • Design of a new interior transverse shear wall or braced frame (and associated foundations) as a voluntary seismic upgrade. This element will be integrated into the architectural space plan so as not to interrupt circulation or adversely impact the function of the space.

Docusign Envelope ID: D35B3BE8-6C11-45CA-A070-8F3E1C48400A 253 967
37-39 Soledad Street Rehabilitation January 9, 2026
39 Soledad:
• Commercial space at first floor
• Demolition of rear one story building
• Open cold shell at second story
Given the lack of design development for the proposed program, aside for the specific voluntary seismic retrofit element (interior shear wall or braced frame), the scope of structural engineering required for the design is not clear at this time. The structural scope may be limited or non-existent for the rehabilitation, although it is possible structural consulting and design could be required for miscellaneous items such as the following:
• Framing modifications for MEP upgrades
• Trenching coordination and patch back details at SOG for new plumbing • Framing evaluation for heavy loads (servers, operable partitions, other items) • Seismic anchorage for suspended elements (soffits) or partial height walls • MEP equipment or solar anchorage
• Design of new openings or supports for improved vertical circulation (elevators)

SCOPE OF STRUCTURAL ENGINEERING SERVICES
This proposal includes structural engineering services for the scope of work described above. Our basic services consist of the analysis, design, detailing, and specifications for the structural portions of the project and include construction services to review fabrication drawings, respond to clarification requests, and make periodic observations related to structural components and systems.

Our tasks, milestones, responsibilities, and deliverables for the project at each phase are described in detail below:

Construction Documents
• Attend regularly scheduled meetings with the owner, contractor, and design team to develop design strategies and establish key parameters. • Create computational models for the proposed structural modifications and perform detailed analyses demonstrating adequacy for gravity, wind, and earthquake loading. • Review the effects of secondary or nonstructural elements and design the components 2 of 7
Docusign Envelope ID: D35B3BE8-6C11-45CA-A070-8F3E1C48400A 254 968
37-39 Soledad Street Rehabilitation January 9, 2026
required for their support.
• Prepare complete sets of drawings, structural note specifications, and calculations documenting the structural work for bidding, approvals, and construction of the project, including progress deliverables at 60% and 90% milestones. • Establish testing and inspection requirements for all structural materials and workmanship.

Approvals and Bidding
• Respond to plan check comments and revise plans as necessary. • Advise and consult with client and architect during the solicitation and evaluation of contractor bids
• Issue final construction documents and addenda for construction.

Construction Administration
• Attend a pre-construction conference to answer questions about design intent or interpretation of the documents, and to examine the contractor's understanding of the project and its requirements.
• Review fabrication drawings and construction submittals for overall compliance with the structural portion of the contract documents. We assume a single round of review of complete, coordinated, and timely submittal packages that are reviewed and approved by the contractor prior to review by our office.
• Review inspection and test reports for items detailed on the structural drawings or called out in the specifications. Take necessary action on reports indicating non-conforming items. This excludes significant design revisions that may result from non-conformance with and deviations from the contract documents.
• Respond to questions from the client and/or special inspector regarding interpretation of the structural portion of the contract documents.
• Respond to contractor RFIs. This excludes redesign effort or significant changes to the approved plans due to contractor’s means and methods or requests for substitution. This also excludes the design of repair or remediation measures for damaged or inadequately performed work.
• Visit the construction site at appropriate times to observe the progress of construction and its general conformance to structural drawings and specifications. We estimate that the project would include up to two (2) site visits during construction for periodic structural observation. 3 of 7
Docusign Envelope ID: D35B3BE8-6C11-45CA-A070-8F3E1C48400A 255 969
37-39 Soledad Street Rehabilitation January 9, 2026
This excludes site visits for inspection, field coordination, troubleshooting, repair or remediation of damaged or inadequately performed work, and quality control efforts.

FEES
Owing to the uncertainty in the scope required, we propose to provide basic structural engineering services on a time and materials basis. We estimate our fees will be in the range of $35,000-$45,000 although we caution this fee could increase somewhat significantly if extensive structural work is required (i.e. a scenario where a new elevator with pit and penthouse is required in conjunction with a new custom stair, extensive framing strengthening for equipment or occupiable roof loads, and the design and anchorage of 5 to 10 interior architectural elements such as moveable partitions, soffits, partial height walls, etc.)
If you find this proposal acceptable, please sign and return a copy as our authorization to proceed.

Again, thank you for considering Tipping as part of your team for this project. We look forward to working with you. Please do not hesitate to contact us if you have any questions.

Sincerely, Accepted:
______________________________________________
Signature
______________________________________________
Marc Steyer, SE, LEED AP Printed Name and Title
Principal
______________________________________________
Date
24294_01.wa2.odt
4 of 7
Docusign Envelope ID: D35B3BE8-6C11-45CA-A070-8F3E1C48400A 256 970
 

 











 



 !

"#$%&&''"()



 *+,*-,./ 01234526783462 937: 7;<=>?@?A=A?BC54D5E=FGF E69 D;F?HC E?II?CH 6CH?C;;JFKK 0L956CH?C;;JF 3CA;JM=N; 6CH?C;;JF 6O?@P 0BJ@=CQ EBA=@ 5RST54BCFAJUNA?BC5DBNUO;CAF5VR5W;;GFX YZ[\]^S_SS ` ` ` ` Ya\SRS_SS ` ` ` ` Ya\ZaS_SS ` ` ` ` Y^\b[S_SS E=FG5a52U>`EBA=@ Yca\[]S_SS 5bST54BCFAJUNA?BC5DBNUO;CAF5VR5W;;GFX YZ]\a^S_SS ` YR^S_SS ` Ya\]ZS_SS ` YZ\[SS_SS E=FG5a52U>`EBA=@5 Y[[[\dRS_SS 4BCMBJO;Q52;A5V[SST54BCFAJUNA?BC5DBNUO;CAFX5Vd5W;;GFX ` Yd\^]S_SS ` Y[R\ccS_SS ` Yd\SSS_SS ` Yc]S_SS Y^\ZSS_SS ` Yd\S]S_SS E=FG5d52U>`EBA=@5 Ydd\SSS_SS 4BCFAJUNA?BC51QO?C?FAJ=A?BC5=CQ5eJBf;NA54@BF;`BUA5V=FFUO;5[a5OBCA<5NBCFAJUNA?BC5QUJ=A?BCX Y[\[cS_SS Y]S\R[S_SS ` YZ\c[^_SS ` Y[^\bbS_SS ` Yb\dbS_SS ` Y^\[bS_SS ` Yd\SRS_SS ` Y^\]SS_SS ` Y[Z\ZSS_SS ` YZ\bSS_SS E=FG5]52U>`EBA=@5 Y[[]\ad^_SS 7;?O>UJF=>@;56gI;CF;F Yd\da^_SS EhE1i Yd]]\SRS_SS YaR\cbS_SS
jklmnoplo qrokslosktu vwxnwppky qzn{nu|vwxnwppky q}v~y qrpl€y ‚ƒ‚„p{pu |z
w€okslon
w|„
ls†pwo€ ‡ˆ‰Š‚‹‹ ‡‚ŒŠ‹‹‹ ‡‚ˆŠ‰Œ‹ ‡‚Š‹‹ Ž ‚ƒˆzunpwo|p{np|}pponwx ‡ˆŠ‹‹ ‚ƒ‘’nސpp“u”|~k •plo|}pponwx€|q‘y ‡ˆŠ‰ˆ‹ ‚ƒ–~k
•plo|}twtxp†pwo|—|˜z ‡ŒŠ™‚‹ št€“|ˆ|rs›Žo
otu ˆƒ‚„p{pu
|z
w€okslon
w|„
ls†pwo€ ‡ˆ™Š™‹‹ ‡‚ŒŠ‹‹‹ ‡‚ˆŠ‰Œ‹ ‡‚Š‹‹ ˆƒ‘~kptkp|~pk†no|€s›†n€€n w|o
|zno” ‡Œ‹ Ž Ž Ž ˆƒ–ƒ’nސpp“u”|~k
•plo|}pponwx€|q‘y ‡ˆŠ–‰‹ Ž Ž Ž ˆƒŒ~k
•plo|}twtxp†pwo|—|˜z ‡‰Š‚‹‹ Ž Ž Ž št€“|ˆ|rs›Žš
otu| ‘ƒ‚p€
wœ|o
|zno”|˜sp€on
w€|toopwœ|†pponwx|nom|kp{np|€otž q{nkostuy ‡‘ŠŒ–‹ Ž Ž Ž ‘ƒˆp{n€p|„ktnwx€ ‡‚ˆŠ–Ÿ‹ Ž ‡ˆŠ‹‹‹ ‡ˆŠ–‹‹ ‘ƒ‘p{n€p|rpln nlton w€ ‡‘Š‹‹‹ Ž Ž Ž ‘ƒ–’nސpp“u”|~k
•plo|†pponwx€|qˆy ‡Ÿ–‹ Ž Ž Ž ‘ƒŒp€
wœ|o
|’nœœpk€|˜sp€on
w€||p{np|’nœœpk|¡~|joopwœ|’nœ ¢tu“ ‡ŒŠ‰‹‹ ‘ƒ~k
•plo|}twtxp†pwo ‡‘Š‹–‹ Ž Ž Ž –ƒ‚p{np|£z|rlmpœsup ‡‚Š‚Ÿ‹ Ž Ž Ž –ƒˆp€ wœ|o
|¡¤€|qs|o
|‘‹y ‡‚–ЉŒ‹ ‡‚ŒŠ‹‹‹ ‡‘Šˆ‹‹ ‡ŒŠ‰‹‹ ‡‚Š™‹ –ƒ‘jr¥€|qs|o |‚Œy ‡‰ŠŸ‚Œ Ž Ž Ž –ƒ–rs›†nootu|p{np|qs|o
|ˆŒy ‡‚ŒŠ™™‹ Ž Ž Ž –ƒŒjr¤€|qs|o
|‚Œy ‡™Š‘™‹ Ž Ž Ž –ƒzmtwxp|¦kœpk|kp{np|qs|o
|‚Œy ‡ŒŠ‚™‹ Ž Ž Ž –ƒ‰z
woktlo
k|~t”|junlton
w|p{np€|qs|o
|‚ˆy ‡‘Š‹‹ Ž Ž Ž –ƒŸ¦jz|}pponwx€|Ž|{nkostu|qˆ–y ‡ŒŠ–‹‹ Ž Ž Ž –ƒ™rnop|¢tu“€|qy ‡‚‰Š‰‹‹ Ž Ž Ž –ƒ‚~swlm|tu“|twœ|knop|s|qˆy ‡‰Š™‹‹ Ž Ž Ž ‡‚ŠŸˆŒƒ‹‹ ‡Œ‹‹ƒ‹‹ ‡Œ‹‹ƒ‹‹ ‡Œ‹‹ƒ‹‹ ˆƒˆ„p{pu
|p{np|šplmwnltu|rpl nlton
w€ ‡‚ˆŠ‰ˆ‹ Ž Ž Ž ‡‚–Š‚‰‹
§§¨©ªª«¬­®¯°¨±²«³´µ°µ¨¶·¨¸¹´º¨¯«®º»ª¸­®¸ ¼°°¨½¾´¶´¸¨¿¨À«²¨Á«®º»ª¸­®¸¨Â²«±«º­ªº Docusign Envelope ID: D35B3BE8-6C11-45CA-A070-8F3E1C48400A 257 971

Page 1 of 2 ends

Version: July 2024
AGREEMENT —AMENDMENT NO. 5 TO

AGREEMENT FOR PROFESSIONAL SERVICES

BETWEEN
TEF ARCHITECTURE AND INTERIOR DESIGN, INC. AND CITY OF SALINAS This Amendment No. 5 to the Professional Services Agreement (the “Amendment”) is entered into this 21st day of April 2026, by and between the City of Salinas (the “City”) and TEF Architecture and Interior Design, Inc., (the “Consultant”). City and Contractor may be individually referred to herein as a “Party” and collectively the City and Contractor may be referred to as the “Parties.”

RECITALS
WHEREAS, the City and Contractor first entered into a/an Professional Services Agreement effective July 1, 2024, pursuant to which Contractor agreed to act as and provide certain services to the City for compensation (the “Agreement”); and
WHEREAS, on November 19, 2024, the Council approved Amendment No. 1 to the TEF Architecture and Interior Design, Inc. agreement to refine the design concepts further and select a preferred concept for 34-38 Soledad Street, to include additional design and pre-development work for the City-owned property at 45 Soledad Street, extend the term of the contract to December 31, 2025, and increase the not to exceed amount to $252,290.00; and
WHEREAS, On July 1, 2025, the Council approved Amendment No. 2 to develop the design concepts for 34-38 37-39, and 45 Soledad Street into schematic designs for entitlement prior to the preparation of a Request for Proposals for development of the sites, extend the term of the contract to December 31, 2026, and increase the not to exceed amount to $736,560.00; and

WHEREAS, On October 28, 2025, the Council approved Amendment No. 3 to complete additional design, historic structure analysis, and structural engineering work for 34, 36, 38, and 40, 37 and 39, and 45 Soledad Street prior to the preparation of a Request for Proposals for development of the site, and increase the not to exceed compensation amount to $840,889; and
WHEREAS, On February 3rd, 2026, the Council approved Amendment No. 4 to complete additional design work and provide Permit and Bid documents and construction administration, and increase the not to exceed compensation amount to $1,314,499; and
WHEREAS, the City and Contractor desire to further amend the Agreement to reflect the additional scope provided by consultant and reflect the revised compensation to be paid to consultant; and NOW, THEREFORE, in mutual consideration of the terms and conditions set forth below, the Parties agree to further amend the Agreement as follows:

TERMS

1. Section 1 of the Agreement is further amended to add the additional services outlined Consultant proposal attached hereto as Exhibit A to the Consultant’s scope of services.

2. Section 3 of the Agreement is amended to increase the total compensation amount by $51,235, for a maximum compensation amount not to exceed amount to $1,365,734.

Docusign Envelope ID: A8D61F3A-9261-8018-8033-8E4A53F655C3 258 92

Page 2 of 2 ends

Version: July 2024

3. All other covenants, terms, and conditions set forth in the Agreement and not amended by this Amendment shall remain in full force and effect as if fully set forth herein.

IN WITNESS WHEREOF, the undersigned, as authorized representatives of the City and Contractor have entered into this Amendment as of the date first written above.

CITY OF SALINAS
___________________________________
René Mendez, City Manager
APPROVED AS TO FORM:
___________________________________
□ Christopher A. Callihan, City Attorney
□ Rhonda Combs, Assistant City Attorney
TEF ARCHITECTURE AND INTERIOR DESIGN, INC.
____________________________________
Printed name: Maryam Rostami__________
Title: Principal________________________
Docusign Envelope ID: A8D61F3A-9261-8018-8033-8E4A53F655C3 259 92
Certificate Of Completion
Envelope Id: A8D61F3A-9261-8018-8033-8E4A53F655C3 Status: Completed Subject: Complete with Docusign: Amendment No. 5 TEF Architecture and Interior Design (04212026) Source Envelope:

Document Pages: 2 Signatures: 2 Envelope Originator:

Certificate Pages: 5 Initials: 0 Patricia M. Soratos
AutoNav: Enabled
EnvelopeId Stamping: Enabled
Time Zone: (UTC-08:00) Pacific Time (US & Canada)
200 Lincoln Avenue
Salinas, CA 93901
[email protected]
IP Address: 192.70.238.194
Record Tracking
Status: Original
4/27/2026 11:57:46 AM
Holder: Patricia M. Soratos
[email protected]
Location: DocuSign
Signer Events Signature Timestamp
Christopher A. Callihan
[email protected]
City Attorney
City of Salinas
Security Level: Email, Account Authentication
(None)
Signature Adoption: Pre-selected Style
Using IP Address: 198.212.195.93
Signed using mobile
Sent: 4/27/2026 11:59:56 AM
Viewed: 4/27/2026 5:14:24 PM
Signed: 4/27/2026 5:14:29 PM
Electronic Record and Signature Disclosure:

Not Offered via Docusign
Rene Mendez
[email protected]
Rene Mendez, City Manager
Security Level: Email, Account Authentication
(None) Signature Adoption: Pre-selected Style
Using IP Address: 192.70.238.194
Sent: 4/27/2026 5:14:30 PM
Viewed: 4/28/2026 10:37:33 AM
Signed: 4/28/2026 10:37:44 AM
Electronic Record and Signature Disclosure:

Accepted: 12/31/2025 12:55:33 PM
ID: fc304b5a-9076-43a3-84fa-d428406abc97
In Person Signer Events Signature Timestamp
Editor Delivery Events Status Timestamp
Agent Delivery Events Status Timestamp
Intermediary Delivery Events Status Timestamp
Certified Delivery Events Status Timestamp
Carbon Copy Events Status Timestamp
Kirsten Zehring
[email protected]
City of Salinas
Security Level: Email, Account Authentication
(None)
Sent: 4/28/2026 10:37:45 AM
Electronic Record and Signature Disclosure:

Not Offered via Docusign
Witness Events Signature Timestamp
260 93
Notary Events Signature Timestamp
Envelope Summary Events Status Timestamps
Envelope Sent Hashed/Encrypted 4/27/2026 11:59:56 AM
Certified Delivered Security Checked 4/28/2026 10:37:33 AM Signing Complete Security Checked 4/28/2026 10:37:44 AM Completed Security Checked 4/28/2026 10:37:46 AM
Payment Events Status Timestamps
Electronic Record and Signature Disclosure
261 93

CONSUMER DISCLOSURE
From time to time, Carahsoft OBO City of Salinas - City Clerk's Office (we, us or Company) may be required by law to provide to you certain written notices or disclosures. Described below are the terms and conditions for providing to you such notices and disclosures electronically through the DocuSign, Inc. (DocuSign) electronic signing system. Please read the information below carefully and thoroughly, and if you can access this information electronically to your satisfaction and agree to these terms and conditions, please confirm your agreement by clicking the ‘I agree’ button at the bottom of this document.

Getting paper copies
At any time, you may request from us a paper copy of any record provided or made available electronically to you by us. You will have the ability to download and print documents we send to you through the DocuSign system during and immediately after signing session and, if you elect to create a DocuSign signer account, you may access them for a limited period of time (usually 30 days) after such documents are first sent to you. After such time, if you wish for us to send you paper copies of any such documents from our office to you, you will be charged a $0.00 per-page fee. You may request delivery of such paper copies from us by following the procedure described below.

Withdrawing your consent
If you decide to receive notices and disclosures from us electronically, you may at any time change your mind and tell us that thereafter you want to receive required notices and disclosures only in paper format. How you must inform us of your decision to receive future notices and disclosure in paper format and withdraw your consent to receive notices and disclosures electronically is described below.

Consequences of changing your mind
If you elect to receive required notices and disclosures only in paper format, it will slow the speed at which we can complete certain steps in transactions with you and delivering services to you because we will need first to send the required notices or disclosures to you in paper format, and then wait until we receive back from you your acknowledgment of your receipt of such paper notices or disclosures. To indicate to us that you are changing your mind, you must withdraw your consent using the DocuSign ‘Withdraw Consent’ form on the signing page of a DocuSign envelope instead of signing it. This will indicate to us that you have withdrawn your consent to receive required notices and disclosures electronically from us and you will no longer be able to use the DocuSign system to receive required notices and consents electronically from us or to sign electronically documents from us.

All notices and disclosures will be sent to you electronically Unless you tell us otherwise in accordance with the procedures described herein, we will provide electronically to you through the DocuSign system all required notices, disclosures, authorizations, acknowledgements, and other documents that are required to be provided or made available to you during the course of our relationship with you. To reduce the chance of you inadvertently not receiving any notice or disclosure, we prefer to provide all of the required notices and disclosures to you by the same method and to the same address that you have given us. Thus, you can receive all the disclosures and notices electronically or in paper format through the paper mail delivery system. If you do not agree with this process, please let us know as described below. Please also see the paragraph immediately above that describes the consequences of your electing not to receive delivery of the notices and disclosures Electronic Record and Signature Disclosure created on: 10/16/2017 3:18:21 PM Parties agreed to: Rene Mendez
262 93
electronically from us.

How to contact Carahsoft OBO City of Salinas - City Clerk's Office:

You may contact us to let us know of your changes as to how we may contact you electronically, to request paper copies of certain information from us, and to withdraw your prior consent to receive notices and disclosures electronically as follows:

To contact us by email send messages to: [email protected] To advise Carahsoft OBO City of Salinas - City Clerk's Office of your new e-mail address To let us know of a change in your e-mail address where we should send notices and disclosures electronically to you, you must send an email message to us at [email protected] and in the body of such request you must state: your previous e-mail address, your new e-mail address.

We do not require any other information from you to change your email address..

In addition, you must notify DocuSign, Inc. to arrange for your new email address to be reflected in your DocuSign account by following the process for changing e-mail in the DocuSign system.

To request paper copies from Carahsoft OBO City of Salinas - City Clerk's Office To request delivery from us of paper copies of the notices and disclosures previously provided by us to you electronically, you must send us an e-mail to [email protected] and in the body of such request you must state your e-mail address, full name, US Postal address, and telephone number. We will bill you for any fees at that time, if any.

To withdraw your consent with Carahsoft OBO City of Salinas - City Clerk's Office To inform us that you no longer want to receive future notices and disclosures in electronic format you may:
i. decline to sign a document from within your DocuSign session, and on the subsequent page, select the check-box indicating you wish to withdraw your consent, or you may; ii. send us an e-mail to [email protected] and in the body of such request you must state your e-mail, full name, US Postal Address, and telephone number. We do not need any other information from you to withdraw consent.. The consequences of your withdrawing consent for online documents will be that transactions may take a longer time to process..

Required hardware and software
Operating Systems: Windows® 2000, Windows® XP, Windows
Vista®; Mac OS® X
Browsers: Final release versions of Internet Explorer® 6.0 or above (Windows only); Mozilla Firefox 2.0
or above (Windows and Mac); Safari™ 3.0 or
above (Mac only)
PDF Reader: Acrobat® or similar software may be required to view and print PDF files
Screen Resolution: 800 x 600 minimum
Enabled Security Settings: Allow per session cookies
** These minimum requirements are subject to change. If these requirements change, you will be asked to re-accept the disclosure. Pre-release (e.g. beta) versions of operating systems and browsers are not supported.

Acknowledging your access and consent to receive materials electronically 263 93
To confirm to us that you can access this information electronically, which will be similar to other electronic notices and disclosures that we will provide to you, please verify that you were able to read this electronic disclosure and that you also were able to print on paper or electronically save this page for your future reference and access or that you were able to e-mail this disclosure and consent to an address where you will be able to print on paper or save it for your future reference and access. Further, if you consent to receiving notices and disclosures exclusively in electronic format on the terms and conditions described above, please let us know by clicking the ‘I agree’ button below.

By checking the ‘I agree’ box, I confirm that:
• I can access and read this Electronic CONSENT TO ELECTRONIC RECEIPT OF ELECTRONIC CONSUMER DISCLOSURES document; and
• I can print on paper the disclosure or save or send the disclosure to a place where I can print it, for future reference and access; and
• Until or unless I notify Carahsoft OBO City of Salinas - City Clerk's Office as described above, I consent to receive from exclusively through electronic means all notices, disclosures, authorizations, acknowledgements, and other documents that are required to be provided or made available to me by Carahsoft OBO City of Salinas - City Clerk's Office during the course of my relationship with you.
264 93
City of Salinas
Legislation Text
200 Lincoln Ave., Salinas,
CA 93901
www.salinas.gov
File #: ID#26-364, Version: 1
Amendment No. 5 to Agreement for Services with California Premier Restoration for Emergency CleanUp and Stabilization of 37 and 39 Soledad Street Approve a Resolution authorizing the City Manager to execute Amendment No. 5 to Agreement for Services with California Premier Restoration for emergency clean-up and stabilization of 37 and 39 Soledad Street to increase the total compensation amount by $2,904, for a maximum compensation amount not to exceed $454,224.

City of Salinas Page 1 of 1 Printed on 7/30/2026
powered by Legistar™265
Page | 1

CITY OF SALINAS

COUNCIL STAFF REPORT
DATE: AUGUST 4, 2026
DEPARTMENT: COMMUNITY DEVELOPMENT
FROM: LISA BRINTON, DIRECTOR
BY: GRANT LEONARD, PLANNING MANAGER
TITLE: AMENDMENT NO. 5 TO AGREEMENT FOR SERVICES WITH

CALIFORNIA PREMIER RESTORATION FOR EMERGENCY
CLEAN-UP AND STABILIZATION OF 37 AND 39 SOLEDAD
STREET
RECOMMENDED MOTION:

A motion to approve a Resolution authorizing the City Manager to execute Amendment No. 5 to Agreement for Services with California Premier Restoration for emergency clean-up and stabilization of 37 and 39 Soledad Street to increase the total compensation amount by $2,904, for a maximum compensation amount not to exceed $454,224.

EXECUTIVE SUMMARY:

The City currently has an Agreement for Services with California Premier Restoration for emergency clean-up and stabilization of 37 and 39 Soledad Street. This Amendment expands the scope of services provided and increases the total compensation amount by $2,904 for a maximum compensation amount not to exceed $454,224.

BACKGROUND:

As part of the on-going efforts to implement the Chinatown Revitalization Plan (2019), the City purchased the Republic Café and Lotus Inn (37 and 39 Soledad Street) in December 2024. The buildings are currently boarded up and were damaged by a fire in 2022. In November of 2025, the City entered into an Agreement for Services with California Premier Restoration for emergency clean-up and stabilization of 37 and 39 Soledad Street with a not to exceed amount of $247,150.

On January 30, 2026, the City executed Amendment No. 1 to the Agreement for Services with California Premier Restoration to extend the term to June 30, 2026. On February 3, 2026, the City executed Amendment No. 2 to the Agreement for Services with California Premier Restoration to complete demolition and disposal of additional materials from 39 Soledad Street. On April 7, 2026, the Agreement was further amended to complete the removal of hazardous materials from 39 Soledad Street (Amendment No. 3). On June 30, 2026, the City executed Amendment No. 4 to the 266
Page | 2
Agreement for Services with California Premier Restoration to extend the term to December 31, 2026.

The City and California Premier Restoration have identified additional engineering work to be completed, as outlined in the attached Change Order (Exhibit A). Amendment No. 5 will allow the City and California Premier Restoration to complete the additional work and prepare the building for future rehabilitation and restoration work.

CEQA CONSIDERATION:

Not a Project. The City of Salinas has determined that the proposed action is not a project as defined by the California Environmental Quality Act (CEQA) (CEQA Guidelines Section 15378).

In addition, CEQA Guidelines Section 15061 includes the general rule that CEQA applies only to activities which have the potential for causing a significant effect on the environment. Where it can be seen with certainty that there is no possibility that the activity in question may have a significant effect on the environment, the activity is not subject to CEQA. Because the proposed action and this matter have no potential to cause any effect on the environment, or because it falls within a category of activities excluded as projects pursuant to CEQA Guidelines section 15378, this matter is not a project. Because the matter does not cause a direct or foreseeable indirect physical change on or in the environment, this matter is not a project. Any subsequent discretionary projects resulting from this action will be assessed for CEQA applicability.

CALIFORNIA GOVERNMENT CODE §84308 APPLIES:

Yes.

STRATEGIC PLAN INITIATIVE:

Development of the City-owned properties in Chinatown advances the City Council’s 2025-2028 Housing and Economic Development initiatives by supporting the development of mixed-use affordable housing and the revitalization of the Chinatown neighborhood.

DEPARTMENTAL COORDINATION:

The Community Development Department is leading this effort with close coordination with Public Works and Finance Departments.

FISCAL AND SUSTAINABILITY IMPACT:

Funding for Amendment No. 4 will come from the City’s Chinatown Revitalization CIP (9070).

Fund General Ledger Number
(Operating/CIP)
General Ledger Account
Name
Remaining Budget
Appropriation
Amount Requested
1000 30.9070-63.5900 Outside Services Other
Professional Services
$586,178 $2,904
267
Page | 3
ATTACHMENTS:

1. Resolution

2. Amendment No. 5
a. Exhibit “A” California Premier Restoration Change Order

3. Agreement for Services

4. Amendment No. 1

5. Amendment No. 2

6. Amendment No. 3

7. Amendment No. 4
268
Page | 1
RESOLUTION NO.

A RESOLUTION APPROVING AMENDMENT NO. 5 TO THE AGREEMENT FOR

SERVICES BETWEEN THE CITY OF SALINAS AND CALIFORNIA PREMIER

RESTORATION
WHEREAS, as part of the on-going efforts to implement the Chinatown Revitalization Plan, the City purchased 37 and 39 Soledad Street in December 2024; and WHEREAS, 37 and 39 Soledad Street are currently boarded up and were damaged by a fire in 2022; and
WHEREAS, in November of 2025, the City entered into an Agreement for Services with California Premier Restoration for emergency clean-up and stabilization of 37 and 39 Soledad Street with a not to exceed amount of $247,150; and
WHEREAS, on January 30, 2026, the City approved Amendment No. 1 to the Agreement for Services with California Premier Restoration in January 2026, to extend the term to June 30, 2026; and
WHEREAS, on February 3, 2026, the City approved Amendment No. 2 to the Agreement for Services between the City of Salinas and California Premier Restoration to expand the scope of services and increase the total compensation amount by $135,000 for a maximum not to exceed compensation amount of $382,150.00
WHEREAS, on April 7, 2026, the City approved Amendment No. 3 to the Agreement for Services with California Premier Restoration to expand the scope of services and increase the total compensation amount by $69,170 for a maximum not to exceed compensation amount of $451,320.00.

WHEREAS, on June 30, 2026, the City approved Amendment No. 4 to the Agreement for Services with California Premier Restoration to extend contact to December 31, 2026.

WHEREAS, City and California Premier Restoration have identified additional engineering work to be completed, as outlined in the attached Change Order (Exhibit A); and WHEREAS, the City has $473,835 in the Chinatown Revitalization Plan CIP 9070 available for predevelopment work at 37 and 39, and therefore funding for Amendment No. 5 will come from the City’s Chinatown Revitalization CIP (9070); and WHEREAS, the City of Salinas has determined that the proposed action is not a project as defined by the California Environmental Quality Act (CEQA) (CEQA Guidelines Section 15378). Any subsequent discretionary projects resulting from this action will be assessed for CEQA applicability.
269
Page | 2
NOW, THEREFORE, BE IT RESOLVED the Salinas City Council hereby authorizes the City Manager to execute Amendment No. 5 to Agreement for Services with California Premier Restoration for emergency clean-up and stabilization of 37 and 39 Soledad Street to increase the total compensation amount by $2,904, for a maximum compensation amount not to exceed $454,224. Funding for Amendment No. 5 will come from the City’s Chinatown Revitalization CIP (9070)
PASSED AND APPROVED this 4th day of August 2026, by the following vote:

AYES:

NOES:

ABSENT:

ABSTAIN:

APPROVED:
_______________________
Dennis Donohue, Mayor
ATTEST:
_________________________
Patricia M. Soratos, City Clerk
270
271
272
273


 

 



 




 

 

 


274


 

 



 




 

 

 


275


 

 



 




 

 

 


276


 

 



 




 

 

 


277


 

 



 




 

 

 


278


 

 



 




 

 

 


279


 

 



 




 

 

 


280


 

 



 




 

 

 


281


 

 



 




 

 

 


282


 

 



 




 

 

 


283


 

 



 




 

 

 


284


 

 



 




 

 

 


285


 

 



 




 

 

 


286


 

 



 




 

 

 


287



 

 

 


288



 

 

 


289



 

 

 


290



 

 

 


291



 

 

 


292



 

 

 


293



 

 

 


294



 

 

 


295



 

 

 


296



 

 

 


297



 

 

 


298



 

 

 


299

Page 1 of 2 ends

Form: Agreement Amendment
Version: July 2025
AGREEMENT —AMENDMENT NO. [1] TO
37 AND 39 SOLEDAD STREET EMERGENCY CLEAN-UP AND STABILIZATION

BETWEEN CITY OF SALINAS AND CALIFORNIA PREMIER RESTORATION This Amendment No. 1 to the Agreement for Services for 37 And 39 Soledad Street Emergency Clean-Up And Stabilization (the “Amendment”) is entered into this 30th day of January 2026, by and between the City of Salinas (the “City”) and California Premier Restoration, a California Corporation, (the “Contractor”). City and Contractor may be individually referred to herein as a “Party” and collectively the City and Contractor may be referred to as the “Parties.”

RECITALS
WHEREAS, the City and Contractor first entered into a/an Agreement for Services for 37 And 39 Soledad Street Emergency Clean-Up And Stabilization effective November 14th, 2025, pursuant to which Contractor agreed to act as and provide certain services to the City for compensation (the “Agreement”); and WHEREAS, the City and Contractor desire to amend the Agreement to reflect the additional scope of services provided by contractor, to reflect the revised compensation to be paid to contractor, and to extend the term of the agreement.

NOW, THEREFORE, in mutual consideration of the terms and conditions set forth below, the Parties agree as follows:

TERMS

1. The Agreement, Term section, is amended to extend the following:

Work under this agreement shall be completed by 06/30/2026 unless City grants a written extension of time as set forth in Section 2.

2. All other covenants, terms, and conditions set forth in the Agreement and not amended by this Amendment shall remain in full force and effect as if fully set forth herein.

IN WITNESS WHEREOF, the undersigned, as authorized representatives of the City and Contractor have entered into this Agreement as of the date first written above.

CITY OF SALINAS
___________________________________
René Mendez, City Manager
APPROVED AS TO FORM:
___________________________________
□ Christopher A. Callihan, City Attorney
□ Rhonda Combs, Assistant City Attorney
California Premier Restoration, a California Corporation Docusign Envelope ID: 173CE8B8-27C1-4212-8B88-E00EBE7BC26F Docusign Envelope ID: 1392BA27-E9E2-4D8F-92A5-92C4584A6A37 300 9

Page 2 of 2 ends

Form: Agreement Amendment
Version: July 2025
____________________________________
Printed name: Michael Mosebach_________
Title: President________________________
Docusign Envelope ID: 173CE8B8-27C1-4212-8B88-E00EBE7BC26F Docusign Envelope ID: 1392BA27-E9E2-4D8F-92A5-92C4584A6A37 301 9
Docusign Envelope ID: 173CE8B8-27C1-4212-8B88-E00EBE7BC26F Docusign Envelope ID: 1392BA27-E9E2-4D8F-92A5-92C4584A6A37  
 

 



 




 

 

 


302 9
Docusign Envelope ID: 173CE8B8-27C1-4212-8B88-E00EBE7BC26F Docusign Envelope ID: 1392BA27-E9E2-4D8F-92A5-92C4584A6A37  
 

 



 




 

 

 


303 9
Docusign Envelope ID: 173CE8B8-27C1-4212-8B88-E00EBE7BC26F Docusign Envelope ID: 1392BA27-E9E2-4D8F-92A5-92C4584A6A37  
 

 



 




 

 

 


304 9
Docusign Envelope ID: 173CE8B8-27C1-4212-8B88-E00EBE7BC26F Docusign Envelope ID: 1392BA27-E9E2-4D8F-92A5-92C4584A6A37  
 

 



 




 

 

 


305 9
Docusign Envelope ID: 173CE8B8-27C1-4212-8B88-E00EBE7BC26F Docusign Envelope ID: 1392BA27-E9E2-4D8F-92A5-92C4584A6A37  
 

 



 




 

 

 


306 9
Docusign Envelope ID: 173CE8B8-27C1-4212-8B88-E00EBE7BC26F Docusign Envelope ID: 1392BA27-E9E2-4D8F-92A5-92C4584A6A37  
 

 



 




 

 

 


307 9
Docusign Envelope ID: 173CE8B8-27C1-4212-8B88-E00EBE7BC26F Docusign Envelope ID: 1392BA27-E9E2-4D8F-92A5-92C4584A6A37  
 

 



 




 

 

 


308 9
Docusign Envelope ID: 173CE8B8-27C1-4212-8B88-E00EBE7BC26F Docusign Envelope ID: 1392BA27-E9E2-4D8F-92A5-92C4584A6A37  
 

 



 




 

 

 


309 9
Docusign Envelope ID: 173CE8B8-27C1-4212-8B88-E00EBE7BC26F Docusign Envelope ID: 1392BA27-E9E2-4D8F-92A5-92C4584A6A37  
 

 



 




 

 

 


310 9
Docusign Envelope ID: 173CE8B8-27C1-4212-8B88-E00EBE7BC26F Docusign Envelope ID: 1392BA27-E9E2-4D8F-92A5-92C4584A6A37  
 

 



 




 

 

 


311 9
Docusign Envelope ID: 173CE8B8-27C1-4212-8B88-E00EBE7BC26F Docusign Envelope ID: 1392BA27-E9E2-4D8F-92A5-92C4584A6A37  
 

 



 




 

 

 


312 9
Docusign Envelope ID: 173CE8B8-27C1-4212-8B88-E00EBE7BC26F Docusign Envelope ID: 1392BA27-E9E2-4D8F-92A5-92C4584A6A37  
 

 



 




 

 

 


313 9
Docusign Envelope ID: 173CE8B8-27C1-4212-8B88-E00EBE7BC26F Docusign Envelope ID: 1392BA27-E9E2-4D8F-92A5-92C4584A6A37  
 

 



 




 

 

 


314 9
Docusign Envelope ID: 173CE8B8-27C1-4212-8B88-E00EBE7BC26F Docusign Envelope ID: 1392BA27-E9E2-4D8F-92A5-92C4584A6A37  
 

 



 




 

 

 


315 9
Docusign Envelope ID: 173CE8B8-27C1-4212-8B88-E00EBE7BC26F Docusign Envelope ID: 1392BA27-E9E2-4D8F-92A5-92C4584A6A37 

 

 

 


316 9
Docusign Envelope ID: 173CE8B8-27C1-4212-8B88-E00EBE7BC26F Docusign Envelope ID: 1392BA27-E9E2-4D8F-92A5-92C4584A6A37 

 

 

 


317 9
Docusign Envelope ID: 173CE8B8-27C1-4212-8B88-E00EBE7BC26F Docusign Envelope ID: 1392BA27-E9E2-4D8F-92A5-92C4584A6A37 

 

 

 


318 9
Docusign Envelope ID: 173CE8B8-27C1-4212-8B88-E00EBE7BC26F Docusign Envelope ID: 1392BA27-E9E2-4D8F-92A5-92C4584A6A37 

 

 

 


319 9
Docusign Envelope ID: 173CE8B8-27C1-4212-8B88-E00EBE7BC26F Docusign Envelope ID: 1392BA27-E9E2-4D8F-92A5-92C4584A6A37 

 

 

 


320 9
Docusign Envelope ID: 173CE8B8-27C1-4212-8B88-E00EBE7BC26F Docusign Envelope ID: 1392BA27-E9E2-4D8F-92A5-92C4584A6A37 

 

 

 


321 9
Docusign Envelope ID: 173CE8B8-27C1-4212-8B88-E00EBE7BC26F Docusign Envelope ID: 1392BA27-E9E2-4D8F-92A5-92C4584A6A37 

 

 

 


322 9
Docusign Envelope ID: 173CE8B8-27C1-4212-8B88-E00EBE7BC26F Docusign Envelope ID: 1392BA27-E9E2-4D8F-92A5-92C4584A6A37 

 

 

 


323 9
Docusign Envelope ID: 173CE8B8-27C1-4212-8B88-E00EBE7BC26F Docusign Envelope ID: 1392BA27-E9E2-4D8F-92A5-92C4584A6A37 

 

 

 


324 9
Docusign Envelope ID: 173CE8B8-27C1-4212-8B88-E00EBE7BC26F Docusign Envelope ID: 1392BA27-E9E2-4D8F-92A5-92C4584A6A37 

 

 

 


325 9
Docusign Envelope ID: 173CE8B8-27C1-4212-8B88-E00EBE7BC26F Docusign Envelope ID: 1392BA27-E9E2-4D8F-92A5-92C4584A6A37 

 

 

 


326 9
Docusign Envelope ID: 173CE8B8-27C1-4212-8B88-E00EBE7BC26F Docusign Envelope ID: 1392BA27-E9E2-4D8F-92A5-92C4584A6A37 

 

 

 


327 9
Docusign Envelope ID: FF828B62-9320-46F4-B59F-9D61940B3A 1 A AGREEMENT -AMENDMENT NO. [2] TO
37 AND 39 SOLEDAD STREET EMERGENCY CLEAN-UP AND STABILIZATION

BETWEEN CITY OF SALINAS AND CALIFORNIA PREMIER RESTORATION This Amendment No. 2 to the Agreement for Services for 37 And 39 Soledad Street Emergency Clean-Up And Stabilization (the "Amendment") is entered into this 3rd day of Fedruary 2026, by and between the City of Salinas (the "City") and California Premier Restoration, a California Corporation, (the "Contractor"). City and Contractor may be individually referred to herein as a "Party" and collectively the City and Contractor may be referred to as the "Parties."

RECITALS
WHEREAS, the City and Contractor first entered into an Agreement for Services for 37 And 39 Soledad Street Emergency Clean-Up And Stabilization effective November 14 th
, 2025, pursuant to which Contractor agreed to act as
and provide certain services to the City for compensation (the "Agreement"); and WHEREAS, the City amended the Agreement for Services with California Premier Restoration in January, 2026, to extend the term to June 30, 2026; and
WHEREAS, the City and Contractor desire to further amend the Agreement to reflect the additional scope of services provided by contractor and reflect the revised compensation to be paid to contractor.

NOW, TH EREFORE, in mutual consideration of the terms and conditions set forth below, the Parties agree as follows:

TERMS

1. The Agreement, Scope section, is amended to add the following:

Additional services as described in the Contractor's Change Order 1 (Exhibit A).

2. The Agreement, Payment section, is amended to increase the following:

City agrees to pay and the Contractor agrees to accept as full and fair consideration for the performance of this agreement, Three Hundred Eighty Two Thousand One Hundred and Fifty Dollars ($382,150).

3. All other covenants, terms, and conditions set forth in the Agreement and not amended by this Amendment shall remain in full force and effect as if fully set forth herein.

IN WITNESS WHEREOF, the undersigned, as authorized representatives of the City and Contractor have entered into this Agreement as of the date first written above.

CITY OF SALINAS
Rene Mendez, City Manager
APPROVED AS TO FORM:

Form: Agreement Amendment
Version: July 2025

Page 1 of 2 ends

Docusign Envelope ID: 5D106BCC-CE22-40DE-8B9B-C0F0A8CB8174 328 89
Docusign Envelope ID: 5D106BCC-CE22-40DE-8B9B-C0F0A8CB8174 329 89

Page 1 of 2 ends

Form: Agreement Amendment
Version: April 2026
AGREEMENT —AMENDMENT NO. [3] TO
37 AND 39 SOLEDAD STREET EMERGENCY CLEAN-UP AND STABILIZATION

BETWEEN CITY OF SALINAS AND CALIFORNIA PREMIER RESTORATION This Amendment No. 3 to the Agreement for Services for 37 And 39 Soledad Street Emergency Clean-Up And Stabilization (the “Amendment”) is entered into this 7th day of April, 2026, by and between the City of Salinas (the “City”) and California Premier Restoration, a California Corporation, (the “Contractor”). City and Contractor may be individually referred to herein as a “Party” and collectively the City and Contractor may be referred to as the “Parties.”

RECITALS
WHEREAS, the City and Contractor first entered into an Agreement for Services for 37 And 39 Soledad Street Emergency Clean-Up And Stabilization effective November 14th, 2025, pursuant to which Contractor agreed to act as and provide certain services to the City for compensation (the “Agreement”); and WHEREAS, the City amended the Agreement for Services with California Premier Restoration in January, 2026, to extend the term to June 30, 2026; and
WHEREAS, the City further amended the Agreement for Services with California Premier Restoration in February, 2026, to add additional scope of services and increase the maximum compensation to $382,150; and WHEREAS, the City and Contractor desire to further amend the Agreement to reflect the additional scope of services provided by contractor and reflect the revised compensation to be paid to contractor.

NOW, THEREFORE, in mutual consideration of the terms and conditions set forth below, the Parties agree as follows:

TERMS

1. Section 1 of the Agreement is further amended to add the additional services outlined in the Contractor’s Change Order 2 (Exhibit A).

2. Section 4 of the Agreement is further amended to increase the total compensation by $69,170, for a total maximum compensation amount not to exceed $451,320.

3. All other covenants, terms, and conditions set forth in the Agreement and not amended by this Amendment shall remain in full force and effect as if fully set forth herein.

IN WITNESS WHEREOF, the undersigned, as authorized representatives of the City and Contractor have entered into this Agreement as of the date first written above.

CITY OF SALINAS
___________________________________
René Mendez, City Manager
APPROVED AS TO FORM:

Docusign Envelope ID: FF5A1FDE-3616-4E9E-A8EB-333CD313117C Docusign Envelope ID: 54B1E63C-039C-8784-83FE-8CE85F16FB55 330 896

Page 2 of 2 ends

Form: Agreement Amendment
Version: April 2026
___________________________________
□ Christopher A. Callihan, City Attorney
□ Rhonda Combs, Assistant City Attorney
California Premier Restoration, a California Corporation ____________________________________
Printed name: Michael Mosebach_________
Title: President________________________
Docusign Envelope ID: FF5A1FDE-3616-4E9E-A8EB-333CD313117C Docusign Envelope ID: 54B1E63C-039C-8784-83FE-8CE85F16FB55 331 897

Page 1 of 2 ends

Form: Agreement Amendment
Version: April 2026
AMENDMENT NO. [4] TO
37 AND 39 SOLEDAD STREET EMERGENCY CLEAN-UP AND STABILIZATION

AGREEMENT BETWEEN CITY OF SALINAS AND CALIFORNIA PREMIER RESTORATION This Amendment No. 4 to the Agreement for Services for 37 And 39 Soledad Street Emergency Clean-Up And Stabilization (the “Amendment”) is entered into this 30th day of June, 2026, by and between the City of Salinas (the “City”) and California Premier Restoration, a California Corporation, (the “Contractor”). City and Contractor may be individually referred to herein as a “Party” and collectively the City and Contractor may be referred to as the “Parties.”

RECITALS
WHEREAS, the City and Contractor first entered into an Agreement for Services for 37 And 39 Soledad Street Emergency Clean-Up And Stabilization effective November 14, 2025, pursuant to which Contractor agreed to act as and provide certain services to the City for compensation (the “Agreement”); and WHEREAS, the Agreement was amended in January, 2026, to extend the term to June 30, 2026; and WHEREAS, the Agreement was further amended in February 2026, to add additional scope of services and increase the maximum compensation to $382,150; and
WHEREAS, the Agreement was further amended on April 7th, 2026, to add additional scope of services and increase the maximum compensation to $451,320; and
WHEREAS, the City and Contractor desire to further amend the Agreement to extend the term of the Agreement.

NOW, THEREFORE, in mutual consideration of the terms and conditions set forth below, the Parties agree as follows:

TERMS

1. Section 2 of the Agreement, Term, is further amended to extend the term to December 31, 2026.

2. All other covenants, terms, and conditions set forth in the Agreement and not amended by this Amendment shall remain in full force and effect as if fully set forth herein.

IN WITNESS WHEREOF, the undersigned, as authorized representatives of the City and Contractor have entered into this Amendment as of the date first written above.

CITY OF SALINAS
___________________________________
René Mendez, City Manager
APPROVED AS TO FORM:
___________________________________
Docusign Envelope ID: D5A978CB-C4D2-8E67-8372-4DEDEA7C8A26 332 817

Page 2 of 2 ends

Form: Agreement Amendment
Version: April 2026
□ Christopher A. Callihan, City Attorney
□ Rhonda Combs, Assistant City Attorney
California Premier Restoration, a California Corporation ____________________________________
Printed name: Michael Mosebach_________
Title: President________________________
Docusign Envelope ID: D5A978CB-C4D2-8E67-8372-4DEDEA7C8A26 333 818
Docusign Envelope ID: D5A978CB-C4D2-8E67-8372-4DEDEA7C8A26  
 

 



 




 

 

 


334 819
Docusign Envelope ID: D5A978CB-C4D2-8E67-8372-4DEDEA7C8A26  
 

 



 




 

 

 


335 820
Docusign Envelope ID: D5A978CB-C4D2-8E67-8372-4DEDEA7C8A26  
 

 



 




 

 

 


336 821
Docusign Envelope ID: D5A978CB-C4D2-8E67-8372-4DEDEA7C8A26  
 

 



 




 

 

 


337 822
Docusign Envelope ID: D5A978CB-C4D2-8E67-8372-4DEDEA7C8A26  
 

 



 




 

 

 


338 823
Docusign Envelope ID: D5A978CB-C4D2-8E67-8372-4DEDEA7C8A26  
 

 



 




 

 

 


339 824
Docusign Envelope ID: D5A978CB-C4D2-8E67-8372-4DEDEA7C8A26  
 

 



 




 

 

 


340 825
Docusign Envelope ID: D5A978CB-C4D2-8E67-8372-4DEDEA7C8A26  
 

 



 




 

 

 


341 826
Docusign Envelope ID: D5A978CB-C4D2-8E67-8372-4DEDEA7C8A26  
 

 



 




 

 

 


342 827
Docusign Envelope ID: D5A978CB-C4D2-8E67-8372-4DEDEA7C8A26  
 

 



 




 

 

 


343 828
Docusign Envelope ID: D5A978CB-C4D2-8E67-8372-4DEDEA7C8A26  
 

 



 




 

 

 


344 829
Docusign Envelope ID: D5A978CB-C4D2-8E67-8372-4DEDEA7C8A26  
 

 



 




 

 

 


345 830
Docusign Envelope ID: D5A978CB-C4D2-8E67-8372-4DEDEA7C8A26  
 

 



 




 

 

 


346 831
Docusign Envelope ID: D5A978CB-C4D2-8E67-8372-4DEDEA7C8A26  
 

 



 




 

 

 


347 832
Docusign Envelope ID: D5A978CB-C4D2-8E67-8372-4DEDEA7C8A26 

 

 

 


348 833
Docusign Envelope ID: D5A978CB-C4D2-8E67-8372-4DEDEA7C8A26 

 

 

 


349 834
Docusign Envelope ID: D5A978CB-C4D2-8E67-8372-4DEDEA7C8A26 

 

 

 


350 835
Docusign Envelope ID: D5A978CB-C4D2-8E67-8372-4DEDEA7C8A26 

 

 

 


351 836
Docusign Envelope ID: D5A978CB-C4D2-8E67-8372-4DEDEA7C8A26 

 

 

 


352 837
Docusign Envelope ID: D5A978CB-C4D2-8E67-8372-4DEDEA7C8A26 

 

 

 


353 838
Docusign Envelope ID: D5A978CB-C4D2-8E67-8372-4DEDEA7C8A26 

 

 

 


354 839
Docusign Envelope ID: D5A978CB-C4D2-8E67-8372-4DEDEA7C8A26 

 

 

 


355 840
Docusign Envelope ID: D5A978CB-C4D2-8E67-8372-4DEDEA7C8A26 

 

 

 


356 841
Docusign Envelope ID: D5A978CB-C4D2-8E67-8372-4DEDEA7C8A26 

 

 

 


357 842
Docusign Envelope ID: D5A978CB-C4D2-8E67-8372-4DEDEA7C8A26 

 

 

 


358 843
Docusign Envelope ID: D5A978CB-C4D2-8E67-8372-4DEDEA7C8A26 

 

 

 


359 844

Page 1 of 2 ends

Form: Agreement Amendment
Version: July 2025
AGREEMENT —AMENDMENT NO. [1] TO
37 AND 39 SOLEDAD STREET EMERGENCY CLEAN-UP AND STABILIZATION

BETWEEN CITY OF SALINAS AND CALIFORNIA PREMIER RESTORATION This Amendment No. 1 to the Agreement for Services for 37 And 39 Soledad Street Emergency Clean-Up And Stabilization (the “Amendment”) is entered into this 30th day of January 2026, by and between the City of Salinas (the “City”) and California Premier Restoration, a California Corporation, (the “Contractor”). City and Contractor may be individually referred to herein as a “Party” and collectively the City and Contractor may be referred to as the “Parties.”

RECITALS
WHEREAS, the City and Contractor first entered into a/an Agreement for Services for 37 And 39 Soledad Street Emergency Clean-Up And Stabilization effective November 14th, 2025, pursuant to which Contractor agreed to act as and provide certain services to the City for compensation (the “Agreement”); and WHEREAS, the City and Contractor desire to amend the Agreement to reflect the additional scope of services provided by contractor, to reflect the revised compensation to be paid to contractor, and to extend the term of the agreement.

NOW, THEREFORE, in mutual consideration of the terms and conditions set forth below, the Parties agree as follows:

TERMS

1. The Agreement, Term section, is amended to extend the following:

Work under this agreement shall be completed by 06/30/2026 unless City grants a written extension of time as set forth in Section 2.

2. All other covenants, terms, and conditions set forth in the Agreement and not amended by this Amendment shall remain in full force and effect as if fully set forth herein.

IN WITNESS WHEREOF, the undersigned, as authorized representatives of the City and Contractor have entered into this Agreement as of the date first written above.

CITY OF SALINAS
___________________________________
René Mendez, City Manager
APPROVED AS TO FORM:
___________________________________
□ Christopher A. Callihan, City Attorney
□ Rhonda Combs, Assistant City Attorney
California Premier Restoration, a California Corporation Docusign Envelope ID: 173CE8B8-27C1-4212-8B88-E00EBE7BC26F Docusign Envelope ID: 1392BA27-E9E2-4D8F-92A5-92C4584A6A37 Docusign Envelope ID: D5A978CB-C4D2-8E67-8372-4DEDEA7C8A26 360 845

Page 2 of 2 ends

Form: Agreement Amendment
Version: July 2025
____________________________________
Printed name: Michael Mosebach_________
Title: President________________________
Docusign Envelope ID: 173CE8B8-27C1-4212-8B88-E00EBE7BC26F Docusign Envelope ID: 1392BA27-E9E2-4D8F-92A5-92C4584A6A37 Docusign Envelope ID: D5A978CB-C4D2-8E67-8372-4DEDEA7C8A26 361 846
Docusign Envelope ID: 173CE8B8-27C1-4212-8B88-E00EBE7BC26F Docusign Envelope ID: 1392BA27-E9E2-4D8F-92A5-92C4584A6A37 Docusign Envelope ID: D5A978CB-C4D2-8E67-8372-4DEDEA7C8A26  
 

 



 




 

 

 


362 847
Docusign Envelope ID: 173CE8B8-27C1-4212-8B88-E00EBE7BC26F Docusign Envelope ID: 1392BA27-E9E2-4D8F-92A5-92C4584A6A37 Docusign Envelope ID: D5A978CB-C4D2-8E67-8372-4DEDEA7C8A26  
 

 



 




 

 

 


363 848
Docusign Envelope ID: 173CE8B8-27C1-4212-8B88-E00EBE7BC26F Docusign Envelope ID: 1392BA27-E9E2-4D8F-92A5-92C4584A6A37 Docusign Envelope ID: D5A978CB-C4D2-8E67-8372-4DEDEA7C8A26  
 

 



 




 

 

 


364 849
Docusign Envelope ID: 173CE8B8-27C1-4212-8B88-E00EBE7BC26F Docusign Envelope ID: 1392BA27-E9E2-4D8F-92A5-92C4584A6A37 Docusign Envelope ID: D5A978CB-C4D2-8E67-8372-4DEDEA7C8A26  
 

 



 




 

 

 


365 850
Docusign Envelope ID: 173CE8B8-27C1-4212-8B88-E00EBE7BC26F Docusign Envelope ID: 1392BA27-E9E2-4D8F-92A5-92C4584A6A37 Docusign Envelope ID: D5A978CB-C4D2-8E67-8372-4DEDEA7C8A26  
 

 



 




 

 

 


366 851
Docusign Envelope ID: 173CE8B8-27C1-4212-8B88-E00EBE7BC26F Docusign Envelope ID: 1392BA27-E9E2-4D8F-92A5-92C4584A6A37 Docusign Envelope ID: D5A978CB-C4D2-8E67-8372-4DEDEA7C8A26  
 

 



 




 

 

 


367 852
Docusign Envelope ID: 173CE8B8-27C1-4212-8B88-E00EBE7BC26F Docusign Envelope ID: 1392BA27-E9E2-4D8F-92A5-92C4584A6A37 Docusign Envelope ID: D5A978CB-C4D2-8E67-8372-4DEDEA7C8A26  
 

 



 




 

 

 


368 853
Docusign Envelope ID: 173CE8B8-27C1-4212-8B88-E00EBE7BC26F Docusign Envelope ID: 1392BA27-E9E2-4D8F-92A5-92C4584A6A37 Docusign Envelope ID: D5A978CB-C4D2-8E67-8372-4DEDEA7C8A26  
 

 



 




 

 

 


369 854
Docusign Envelope ID: 173CE8B8-27C1-4212-8B88-E00EBE7BC26F Docusign Envelope ID: 1392BA27-E9E2-4D8F-92A5-92C4584A6A37 Docusign Envelope ID: D5A978CB-C4D2-8E67-8372-4DEDEA7C8A26  
 

 



 




 

 

 


370 855
Docusign Envelope ID: 173CE8B8-27C1-4212-8B88-E00EBE7BC26F Docusign Envelope ID: 1392BA27-E9E2-4D8F-92A5-92C4584A6A37 Docusign Envelope ID: D5A978CB-C4D2-8E67-8372-4DEDEA7C8A26  
 

 



 




 

 

 


371 856
Docusign Envelope ID: 173CE8B8-27C1-4212-8B88-E00EBE7BC26F Docusign Envelope ID: 1392BA27-E9E2-4D8F-92A5-92C4584A6A37 Docusign Envelope ID: D5A978CB-C4D2-8E67-8372-4DEDEA7C8A26  
 

 



 




 

 

 


372 857
Docusign Envelope ID: 173CE8B8-27C1-4212-8B88-E00EBE7BC26F Docusign Envelope ID: 1392BA27-E9E2-4D8F-92A5-92C4584A6A37 Docusign Envelope ID: D5A978CB-C4D2-8E67-8372-4DEDEA7C8A26  
 

 



 




 

 

 


373 858
Docusign Envelope ID: 173CE8B8-27C1-4212-8B88-E00EBE7BC26F Docusign Envelope ID: 1392BA27-E9E2-4D8F-92A5-92C4584A6A37 Docusign Envelope ID: D5A978CB-C4D2-8E67-8372-4DEDEA7C8A26  
 

 



 




 

 

 


374 859
Docusign Envelope ID: 173CE8B8-27C1-4212-8B88-E00EBE7BC26F Docusign Envelope ID: 1392BA27-E9E2-4D8F-92A5-92C4584A6A37 Docusign Envelope ID: D5A978CB-C4D2-8E67-8372-4DEDEA7C8A26  
 

 



 




 

 

 


375 860
Docusign Envelope ID: 173CE8B8-27C1-4212-8B88-E00EBE7BC26F Docusign Envelope ID: 1392BA27-E9E2-4D8F-92A5-92C4584A6A37 Docusign Envelope ID: D5A978CB-C4D2-8E67-8372-4DEDEA7C8A26 

 

 

 


376 861
Docusign Envelope ID: 173CE8B8-27C1-4212-8B88-E00EBE7BC26F Docusign Envelope ID: 1392BA27-E9E2-4D8F-92A5-92C4584A6A37 Docusign Envelope ID: D5A978CB-C4D2-8E67-8372-4DEDEA7C8A26 

 

 

 


377 862
Docusign Envelope ID: 173CE8B8-27C1-4212-8B88-E00EBE7BC26F Docusign Envelope ID: 1392BA27-E9E2-4D8F-92A5-92C4584A6A37 Docusign Envelope ID: D5A978CB-C4D2-8E67-8372-4DEDEA7C8A26 

 

 

 


378 863
Docusign Envelope ID: 173CE8B8-27C1-4212-8B88-E00EBE7BC26F Docusign Envelope ID: 1392BA27-E9E2-4D8F-92A5-92C4584A6A37 Docusign Envelope ID: D5A978CB-C4D2-8E67-8372-4DEDEA7C8A26 

 

 

 


379 864
Docusign Envelope ID: 173CE8B8-27C1-4212-8B88-E00EBE7BC26F Docusign Envelope ID: 1392BA27-E9E2-4D8F-92A5-92C4584A6A37 Docusign Envelope ID: D5A978CB-C4D2-8E67-8372-4DEDEA7C8A26 

 

 

 


380 865
Docusign Envelope ID: 173CE8B8-27C1-4212-8B88-E00EBE7BC26F Docusign Envelope ID: 1392BA27-E9E2-4D8F-92A5-92C4584A6A37 Docusign Envelope ID: D5A978CB-C4D2-8E67-8372-4DEDEA7C8A26 

 

 

 


381 866
Docusign Envelope ID: 173CE8B8-27C1-4212-8B88-E00EBE7BC26F Docusign Envelope ID: 1392BA27-E9E2-4D8F-92A5-92C4584A6A37 Docusign Envelope ID: D5A978CB-C4D2-8E67-8372-4DEDEA7C8A26 

 

 

 


382 867
Docusign Envelope ID: 173CE8B8-27C1-4212-8B88-E00EBE7BC26F Docusign Envelope ID: 1392BA27-E9E2-4D8F-92A5-92C4584A6A37 Docusign Envelope ID: D5A978CB-C4D2-8E67-8372-4DEDEA7C8A26 

 

 

 


383 868
Docusign Envelope ID: 173CE8B8-27C1-4212-8B88-E00EBE7BC26F Docusign Envelope ID: 1392BA27-E9E2-4D8F-92A5-92C4584A6A37 Docusign Envelope ID: D5A978CB-C4D2-8E67-8372-4DEDEA7C8A26 

 

 

 


384 869
Docusign Envelope ID: 173CE8B8-27C1-4212-8B88-E00EBE7BC26F Docusign Envelope ID: 1392BA27-E9E2-4D8F-92A5-92C4584A6A37 Docusign Envelope ID: D5A978CB-C4D2-8E67-8372-4DEDEA7C8A26 

 

 

 


385 870
Docusign Envelope ID: 173CE8B8-27C1-4212-8B88-E00EBE7BC26F Docusign Envelope ID: 1392BA27-E9E2-4D8F-92A5-92C4584A6A37 Docusign Envelope ID: D5A978CB-C4D2-8E67-8372-4DEDEA7C8A26 

 

 

 


386 871
Docusign Envelope ID: 173CE8B8-27C1-4212-8B88-E00EBE7BC26F Docusign Envelope ID: 1392BA27-E9E2-4D8F-92A5-92C4584A6A37 Docusign Envelope ID: D5A978CB-C4D2-8E67-8372-4DEDEA7C8A26 

 

 

 


387 872
Page | 1
RESOLUTION NO. 2026-016
A RESOLUTION APPROVING AMENDMENT NO. 2 TO THE AGREEMENT FOR

SERVICES BETWEEN THE CITY OF SALINAS AND CALIFORNIA PREMIER

RESTORATION
WHEREAS, the City applied for and received $1,555,000 in Regional Early Action Planning Grant (REAP 2.0) funding from the Association of Monterey Bay Area Governments (AMBAG) to complete predevelopment activities for the development of mixed-use affordable housing to be located in the Chinatown neighborhood; and WHEREAS, as part of the on-going efforts to implement the Chinatown Revitalization Plan, the City purchased 37 and 39 Soledad Street in December 2024; and WHEREAS, 37 and 39 Soledad Street are currently boarded up and were damaged due to a fire in 2022; and
WHEREAS, in November of 2025, the City entered into an Agreement for Services with California Premier Restoration for emergency clean-up and stabilization of 37 and 39 Soledad Street with a not to exceed amount of $247,150; and
WHEREAS, the scope of work for California Premier Restoration included an optional task to complete removal of interior finishes and fixtures to bring the interior to bare stud condition following testing for lead and asbestos; and
WHEREAS, the City administratively amended the Agreement for Services with California Premier Restoration in January 2026, to extend the term to June 30, 2026; and WHEREAS, the City completed lead and asbestos testing for the buildings in December 2025, and California Premier Restoration is now prepared to move forward with the removal of the interior finishes, as outlines in the attached Change Order (Exhibit A); and WHEREAS, the Regional Early Action Planning Grant (REAP 2.0) from the Association of Monterey Bay Area Governments (AMBAG) funds this project; and WHEREAS, to meet the March 31, 2026, expenditure deadline, $135,000 in REAP 2.0 funds previously allocated to a separate contract with TEF Design for architectural services for Chinatown are being reallocated to fund Amendment No. 2; and WHEREAS, the City of Salinas has determined that the proposed action is not a project as defined by the California Environmental Quality Act (CEQA) (CEQA Guidelines Section 15378). Any subsequent discretionary projects resulting from this action will be assessed for CEQA applicability.

NOW, THEREFORE, BE IT RESOLVED that the Salinas City Council authorizes the City Manager to execute Amendment No. 2 to the Agreement for Services between the City of Docusign Envelope ID: F59B6D11-9A74-4A8C-A9D9-30829FCA6B03 Docusign Envelope ID: D5A978CB-C4D2-8E67-8372-4DEDEA7C8A26 388 873
Page | 2
Salinas and California Premier Restoration to expand the scope of services provided in Exhibit A, increase the total compensation amount by 135,000 for a maximum not to exceed compensation amount of $382,150.00. REAP 2.0 Grant funds are the funding source.

PASSED AND APPROVED this 3
rd day of February 2026, by the following vote:

AYES: Councilmembers Barajas, Barrera, De La Rosa, Salazar, Sandoval and Mayor Donohue NOES: None
ABSENT: Councilmember D’Arrigo
ABSTAIN: None
APPROVED:
_______________________
Dennis Donohue, Mayor
ATTEST:
______________________________
Alexis Mejia, Assistant City Clerk
Docusign Envelope ID: F59B6D11-9A74-4A8C-A9D9-30829FCA6B03 Docusign Envelope ID: D5A978CB-C4D2-8E67-8372-4DEDEA7C8A26 389 874

MEMORANDUM
DATE: November 14, 2025
TO: Rene Mendez, City Manager
FROM: Lisa Brinton, Director
BY: Grant Leonard, Planning Manager
SUBJECT: 34, 36, and 38 Soledad Street Emergency Fencing At approximately 4:30 p.m. on Monday, September 22, 2025 a fire began inside 38 Soledad Street, Salinas, CA, a boarded-up building located on City-owned property. Due to the condition of the building and status of the fire, the Fire Department determined it was not safe to enter the structure and established a defensive position to monitor the fire and ensure it did not spread to neighboring structures. As a result of the fire, 38 Soledad Street was destroyed, and the adjoining buildings, 36 and 34 Soledad Street were damaged. On Saturday, September 29th, 2025, the Fire Department and Code Enforcement conducted a searched of the site with a cadaver dog that determined no humans were present in the building debris.

The City Chief Building Official and Code Enforcement department have determined that the remaining portions of the building are not structurally sound and pose a danger to the public due to the potential for collapse of the remaining building materials. See photos below.

Given the risk of collapsing building materials, it was critically important to secure the property immediately after the fire to ensure the public could not access the site or the sidewalk in front of the property. The Community Development Department has secured the site with temporary fencing from an available fencing company, JR Fencing. See photos below.

At this time, the Community Development Department seeks to move forward with an after the fact emergency procurement to secure the site after the fire and during demolition, pursuant to Section 18 of the City’s purchasing policy and Section 12-24 of the City Code, due to the urgent need to prevent injury or loss of life that could result from collapse of the remaining structure.

Docusign Envelope ID: B6BA3047-E10F-4E15-96E7-9EC4146DDD0C City Manager
City of Salinas
11/14/2025 | 3:52 PM PST
René Mendez
Docusign Envelope ID: D5A978CB-C4D2-8E67-8372-4DEDEA7C8A26 390 875
Docusign Envelope ID: B6BA3047-E10F-4E15-96E7-9EC4146DDD0C Docusign Envelope ID: D5A978CB-C4D2-8E67-8372-4DEDEA7C8A26 391 876
Docusign Envelope ID: B6BA3047-E10F-4E15-96E7-9EC4146DDD0C Docusign Envelope ID: D5A978CB-C4D2-8E67-8372-4DEDEA7C8A26 392 877
Docusign Envelope ID: B6BA3047-E10F-4E15-96E7-9EC4146DDD0C Docusign Envelope ID: D5A978CB-C4D2-8E67-8372-4DEDEA7C8A26 393 878
Docusign Envelope ID: B6BA3047-E10F-4E15-96E7-9EC4146DDD0C Docusign Envelope ID: D5A978CB-C4D2-8E67-8372-4DEDEA7C8A26 394 879
Docusign Envelope ID: B6BA3047-E10F-4E15-96E7-9EC4146DDD0C Docusign Envelope ID: D5A978CB-C4D2-8E67-8372-4DEDEA7C8A26 395 880
INVOICE #
10335
BILL TO:

City of Salinas City
65 W. Alisal St. 2nd Floor
Salinas, CA. 93901-2639
JOB SITE:

City of Salinas City
34-36 Soledad St.

Salinas, CA. 93901

JR FENCING
P.O. Box 6551
Salinas, CA 93912
License # 721779
P.O. NO. V.O. NO. TERMS
Due on receipt

INVOICE DATE
11/6/2025

PROJECT
Additional Temp fencing
3% convenience fee will be added to the invoice total for credit card payments.

Phone #
831-455-2208
TOTAL

BLK/LOT QTY DESCRIPTION UNIT PRICE AMOUNT
6ft. tall temporary chain link panels, ( 6' X 12'
panels). 3 month rental term
252 10.00 2,520.00
1 350.00 350.00 Deliver & Pickup fee.
1 350.00 350.00 Relocation of temp panels.
$3,220.00
Docusign Envelope ID: B6BA3047-E10F-4E15-96E7-9EC4146DDD0C Docusign Envelope ID: D5A978CB-C4D2-8E67-8372-4DEDEA7C8A26 396 881
Estimate/Contract
DATE
11/3/2025
ESTIMATE #
11579

NAME / ADDRESS
City of Salinas City
65 W. Alisal St. 2nd Floor
Salinas, CA. 93901-2639

JR FENCING
P.O. Box 6551
Salinas, CA 93912
License # 721779
Project
Due on receipt

SALESPERSON
JR
Due Date
34-38 Soledad St. Sa...

EXPIRES ON
12/05/2025

SIGNATURE
Phone # 831-455-2208
Fax # 831-455-2238
TOTAL

DESCRIPTION QTY UNIT PRICE TOTAL
8ft. tall Chain Link Fence. Using 2-7/8 Terminal post set 3-4ft. in concrete, 2-3/8 line post set 3ft. in concrete, 1-5/8 top rails, 7 gauge spring tension wire, and 3/8/11/96 chain link fabric.
130 111.00 14,430.00
Unit price per foot based on Bobcat access.

Labor rate based on prevailing wage rates for Monterey County.

Any additional bonds, permit, and insurance requirements will be added to the total.
_____________________________________
All work will be performed in accordance with standard practice.Property lines must be marked by purchaser and seller assumes no responsibility for location of property lines. Seller is not responsible for any permits. Purchaser is aware and agrees that underlying rock, concrete, shale, hardpan, hidden pipe,electrical wiring, or other substance that will require jackhammering, drilling or if any other condition is unknown to the seller involving extra labor cost, will result in additonal charges apart from this agreement, seller shall honor rescission by purchaser under such state and federal laws pertaining to such action taken by purchaser, guarantees or warranties shall be honored by seller only if in written form or certified. No verbal assurance or guarantees and warranties shall have any validity at any time. The above conditions are binding to the contract. A late charge of

1.5% per month (A.P.R.) is billed on accounts still open 30 days after date of invoice. $14,430.00
Docusign Envelope ID: B6BA3047-E10F-4E15-96E7-9EC4146DDD0C Docusign Envelope ID: D5A978CB-C4D2-8E67-8372-4DEDEA7C8A26 397 882
Estimate/Contract
DATE
11/13/2025
ESTIMATE #
11598

NAME / ADDRESS
City of Salinas City
65 W. Alisal St. 2nd Floor
Salinas, CA. 93901-2639

JR FENCING
P.O. Box 6551
Salinas, CA 93912
License # 721779
Project
Due on receipt

SALESPERSON
JR
Due Date
8' Tall Ornamental Ir...

EXPIRES ON
12/25/2025

SIGNATURE
Phone # 831-455-2208
Fax # 831-455-2238
TOTAL

DESCRIPTION QTY UNIT PRICE TOTAL
The installation of 32' of 8ft. tall Curved Top Ornamental Iron fence.

Using 3x3 11 gauge metal post set in a 10"x 36" concrete footing,1-1/2x 1-1/2 14 gauge top and bottom rails,3/4 x 3/4 16 gauge metal pickets. 1 5,300.00 5,300.00
Any additional bonds, permits, and insurance requirements will be added to the total.

Labor rate based on prevailing wage rates for Monterey County. _____________________________________
All work will be performed in accordance with standard practice.Property lines must be marked by purchaser and seller assumes no responsibility for location of property lines. Seller is not responsible for any permits. Purchaser is aware and agrees that underlying rock, concrete, shale, hardpan, hidden pipe,electrical wiring, or other substance that will require jackhammering, drilling or if any other condition is unknown to the seller involving extra labor cost, will result in additonal charges apart from this agreement, seller shall honor rescission by purchaser under such state and federal laws pertaining to such action taken by purchaser, guarantees or warranties shall be honored by seller only if in written form or certified. No verbal assurance or guarantees and warranties shall have any validity at any time. The above conditions are binding to the contract. A late charge of

1.5% per month (A.P.R.) is billed on accounts still open 30 days after date of invoice. $5,300.00
Docusign Envelope ID: B6BA3047-E10F-4E15-96E7-9EC4146DDD0C Docusign Envelope ID: D5A978CB-C4D2-8E67-8372-4DEDEA7C8A26 398 883
Page | 1
RESOLUTION NO. 2026-046

A RESOLUTION OF THE SALINAS CITY COUNCIL APPROVING AMENDMENT NO. 3 TO THE AGREEMENT FOR SERVICES BETWEEN THE CITY OF SALINAS

AND CALIFORNIA PREMIER RESTORATION
WHEREAS, as part of the on-going efforts to implement the Chinatown Revitalization Plan, the City purchased 37 and 39 Soledad Street in December 2024; and WHEREAS, 37 and 39 Soledad Street are currently boarded up and were damaged due to a fire in 2022; and
WHEREAS, in November of 2025, the City entered into an Agreement for Services with California Premier Restoration for emergency clean-up and stabilization of 37 and 39 Soledad Street for a not to exceed amount of $247,150; and
WHEREAS, the City completed Amendment No. 1 to the Agreement for Services with California Premier Restoration in January, 2026, to extend the term to June 30, 2026; and WHEREAS, the City of Salinas executed Amendment No. 2 to the Agreement for Services between the City of Salinas and California Premier Restoration in February, 2026 to expand the scope of services and increase the total compensation amount by $135,000 for a maximum not to exceed compensation amount of $382,150; and
WHEREAS, City and California Premier Restoration have identified additional work to be completed related to hazardous materials abatement, exterior cleaning and removal of debris, and testing of roof drainage systems, as outlined in the attached Change Order (Exhibit A); and WHEREAS, the City has $1,059,908 in the Chinatown Revitalization Plan CIP 9070 available for predevelopment work at 37 and 39, and therefore funding for Amendment No. 3 will come from the City’s Chinatown Revitalization CIP (9070); and WHEREAS, the City of Salinas has determined that the proposed action is not a project as defined by the California Environmental Quality Act (CEQA) (CEQA Guidelines Section 15378). Any subsequent discretionary projects resulting from this action will be assessed for CEQA applicability.

NOW, THEREFORE, BE IT RESOLVED the Salinas City Council hereby authorizes the City Manager to execute Amendment No. 3 to Agreement for Services with California Premier Restoration for emergency clean-up and stabilization of 37 and 39 Soledad Street to increase the total compensation amount by $69,170 for a maximum compensation amount not to exceed $451,320. Funding for Amendment No. 3 will come from the City’s Chinatown Revitalization CIP (9070).

Docusign Envelope ID: E6AFC3BB-4E2C-8D15-8109-EC2FA460964B Docusign Envelope ID: D5A978CB-C4D2-8E67-8372-4DEDEA7C8A26 399 884
Page | 2
PASSED AND APPROVED this 7
th day of April 2026, by the following vote:

AYES: Councilmembers Barrera, D’Arrigo, De La Rosa, Salazar, Sandoval and Mayor Donohue NOES: None
ABSENT: Councilmember Barajas
ABSTAIN: None
APPROVED:
_______________________
Dennis Donohue, Mayor
ATTEST:
_____________________________
Alexis Mejia, Assistant City Clerk
Docusign Envelope ID: E6AFC3BB-4E2C-8D15-8109-EC2FA460964B Docusign Envelope ID: D5A978CB-C4D2-8E67-8372-4DEDEA7C8A26 400 885

SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE

THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS.

INSURER(S) AFFORDING COVERAGE
INSURER F :

INSURER E :

INSURER D :

INSURER C :

INSURER B :

INSURER A :

NAIC #
NAME:

CONTACT
(A/C, No):

FAX
E-MAIL
ADDRESS:

PRODUCER
(A/C, No, Ext):

PHONE

INSURED
COVERAGES CERTIFICATE NUMBER: REVISION NUMBER:

IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed.

If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).

THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS

CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.

OTHER:
(Per accident)
(Ea accident)
$
$
N / A
SUBR
WVD
ADDL
INSD

THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS

CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. $
$
$
$ PROPERTY DAMAGE
BODILY INJURY (Per accident)
BODILY INJURY (Per person)

COMBINED SINGLE LIMIT

AUTOS ONLY

AUTOS ONLY AUTOS

NON-OWNED

OWNED SCHEDULED

ANY AUTO

AUTOMOBILE LIABILITY
Y / N

WORKERS COMPENSATION

AND EMPLOYERS' LIABILITY
OFFICER/MEMBER EXCLUDED?
(Mandatory in NH)
DESCRIPTION OF OPERATIONS below
If yes, describe under

ANY PROPRIETOR/PARTNER/EXECUTIVE
$
$
$
E.L. DISEASE - POLICY LIMIT
E.L. DISEASE - EA EMPLOYEE
E.L. EACH ACCIDENT
ER

OTH- STATUTEPER
(MM/DD/YYYY) LIMITS POLICY EXP (MM/DD/YYYY)

POLICY EFF LTR TYPE OF INSURANCE POLICY NUMBER INSR
DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required)

EXCESS LIAB
UMBRELLA LIAB EACH OCCURRENCE $
AGGREGATE $
$
OCCUR

CLAIMS-MADE
DED RETENTION $
PRODUCTS - COMP/OP AGG $
GENERAL AGGREGATE $
PERSONAL & ADV INJURY $
MED EXP (Any one person) $
EACH OCCURRENCE $

DAMAGE TO RENTED
PREMISES (Ea occurrence) $

COMMERCIAL GENERAL LIABILITY

CLAIMS-MADE OCCUR
GEN'L AGGREGATE LIMIT APPLIES PER:

POLICY PROJECT LOC

CERTIFICATE OF LIABILITY INSURANCE DATE (MM/DD/YYYY)

CANCELLATION

AUTHORIZED REPRESENTATIVE
ACORD 25 (2016/03)
© 1988-2015 ACORD CORPORATION. All rights reserved.

CERTIFICATE HOLDER
The ACORD name and logo are registered marks of ACORD
HIRED

AUTOS ONLY
ACORD 0025 2016-03 Acroform 11/12/2025 Newfront Insurance Services, LLC 777 Mariners Island Blvd Suite 250 San Mateo CA 94404 Certificate Department (415) 754-3635 [email protected] CALIFORNIA PREMIER RESTORATION 22 Lower Ragsdale Drive, Suite F Monterey CA 93940 Admiral Insurance Company 24856 Infinity Auto Insurance Company 11738 SUNZ Insurance Company 34762 Ironshore Specialty Insurance Company 25445 A X X FEI-ECC-23338-08 03/17/2025 03/17/2026 5,000,000 50,000 5,000 5,000,000 5,000,000 5,000,000 B 50022886201 09/25/2025 03/25/2026 1,000,000 A FEI-EXS-45718-01 03/17/2025 03/17/2026 5,000,000 5,000,000 C X C57201617 02/26/2025 02/26/2026 1,000,000 1,000,000 1,000,000 A Pollution
FEI-ECC-23338-08 03/17/2025 03/17/2026 Aggregate $2,000,000 Ea Poll Condition $1,000,000 (Insurer D) - Excess - XSCUW0032516300 - (03/17/2025 - 03/17/2026) - Each Occurrence/Aggregate: $3,000,000 (Insurer A) - Professional Liability - FEI-ECC-23338-08 - (03/17/2025 - 03/17/2026) - Each Claim: $1,000,000, Aggregate: $2,000,000 Re: City Hall water mitigation.

The City of Salinas, its officers, officials, employees, and volunteers are included as an additional insured as required by a written contract with respect to General Liability. Coverage is Primary and Non-Contributory. Waiver of subrogation applies in favor of The City of Salinas, its officers, officials, employees, and volunteers with respect to General Liability and Workers Compensation. Notice of (continued on page 2) City of Salinas 200 Lincoln Avenue Salinas CA 93901 Docusign Envelope ID: D5A978CB-C4D2-8E67-8372-4DEDEA7C8A26 401 886
EFFECTIVE DATE:

NAMED INSURED

POLICY NUMBER

CARRIER NAIC CODE
AGENCY
LOC #:

AGENCY CUSTOMER ID:

ADDITIONAL REMARKS SCHEDULE Page of

ADDITIONAL REMARKS
FORM NUMBER: FORM TITLE:

THIS ADDITIONAL REMARKS FORM IS A SCHEDULE TO ACORD FORM, © 2008 ACORD CORPORATION. All rights reserved.

The ACORD name and logo are registered marks of ACORD
ACORD 101 (2008/01)
ACORD 0101 2008-01 Acroform
2 2
Newfront Insurance Services, LLC CALIFORNIA PREMIER RESTORATION 25 CERTIFICATE OF LIABILITY INSURANCE Cancellation form #ECC-1315-0118 applies with respect to the General Liability policy. Per project general aggregate applies.

Docusign Envelope ID: D5A978CB-C4D2-8E67-8372-4DEDEA7C8A26 402 887
Workers' Compensation and Employers' Liability Policy
TO

CALIFORNIA WAIVER OF OUR RIGHT TO RECOVER FROM OTHERS ENDORSEMENT 12/31/2024 01/01/2026
C72819895
City of Salines, its officers, officials, employees, and volunteers 200 Lincoln Avenue
Salinas, CA 93901
WLR

CALIFORNIA PREMIER RESTORATION
Monterey, CA 93940
22 Lower Ragsdale Dr Suite F
Indemnity Insurance Company of North America
Waiver of subrogation in favor of the City of Salinas its officers officials employees and volunteers where required by written contract. 11/11/2025
Docusign Envelope ID: D5A978CB-C4D2-8E67-8372-4DEDEA7C8A26 403 888
California Premier Restoration
CG 20 37 12 19 © Insurance Services Office, Inc., 2018 Page 1 of 1 Endorsement Number: 16

ADDITIONAL INSURED OWNERS, LESSEES OR CONTRACTORS

COMPLETED OPERATIONS BLANKET
This endorsement, effective 03/17/2025, attaches to and forms a part of Policy Number FEI-ECC-23338-08.

THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY.

This endorsement modifies insurance provided under the following:

COMMERCIAL GENERAL LIABILITY

SCHEDULE
Name Of Additional Insured Person(s)
Or Organization(s)
Location And Description Of Completed
Operations
Any person(s) or organization(s) whom the Named
Insured agrees, in a written contract, to name as an
additional insured. However, this status exists only for the project specified in that contract.

Information required to complete this Schedule, if not shown above, will be shown in the Declarations.

Docusign Envelope ID: D5A978CB-C4D2-8E67-8372-4DEDEA7C8A26 404 889
California Premier Restoration
ECC-320-0712 © 2018, Freberg Environmental, Inc. Page 1 of 1 Endorsement Number: 6
Automatic Waiver of Subrogation Endorsement
This endorsement, effective 03/17/2025, attaches to and forms a part of Policy Number FEI-ECC-23338-08.

THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY.

This endorsement modifies coverage provided under the following coverage part(s):

COMMERCIAL GENERAL LIABILITY

CONTRACTORS POLLUTION LIABILITY

SCHEDULE
Name of Person or Organization:

Any person(s) or organization(s) to whom the Named Insured agrees, in a written contract, to provide a waiver of subrogation. However, this status exists only for the project specified in that contract.

The Company waives any right of recovery it may have against the person or organization shown in the above Schedule because of payments the Company makes for injury or damage arising out of the work done under a contract with that person or organization. The waiver applies only to the person or organization in the above Schedule.

Under no circumstances shall this endorsement act to extend the policy period, change the scope of coverage or increase the Aggregate Limits of Insurance shown in the Declarations.

Docusign Envelope ID: D5A978CB-C4D2-8E67-8372-4DEDEA7C8A26 405 890
California Premier Restoration
ECC-1315-0118 © 2018, Freberg Environmental, Inc. Page 1 of 2 Endorsement Number: 1

COMMON POLICY CONDITIONS ENDORSEMENT
This endorsement, effective 03/17/2025, attaches to and forms a part of Policy Number FEI-ECC-23338-08.

THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY.

In consideration of the premium charged, and notwithstanding anything contained in this Policy to the contrary, it is hereby agreed that all coverage parts included in this Policy are subject to the following conditions:
(1) CANCELLATION
The Named Insured may cancel this Policy by mailing to the Company written notice stating when thereafter such cancellation shall become effective. The Company may cancel this Policy by mailing to the Named Insured, at the mailing address specified in the Declarations, written notice stating when not less than thirty (30) days thereafter such cancellation shall become effective, except in the event of the nonpayment of premium, not less than ten (10) days advance notice of cancellation shall be given. The mailing of notice as stated above, shall be sufficient proof of either party's intent to cancel. The effective date of cancellation specified in such notice shall terminate the Policy Period. Delivery of such notice shall be equivalent to mailing.

If the Named Insured cancels, the earned premium shall be computed in accordance with the customary short rate table. If the Company cancels, the earned premium shall be computed pro rata. The Company will tender any return premium subject to retaining a minimum earned premium equal to 25% of the amount specified in the Declarations.

Premium adjustment may be made either at the time cancellation is effective or as soon as practicable thereafter, but tender of the unearned premium or return of this Policy, shall not be conditions precedent to cancellation hereunder.
(2) CHANGES
The terms of this Policy shall not be amended, waived or otherwise changed, except by endorsement issued by the Company and made a part of this Policy. (3) EXAMINATION OF BOOKS AND RECORDS
The Company may examine and audit the books and records as they relate to this Policy at any time during the Policy Period and up to three (3) years afterward. (4) INSPECTIONS AND SURVEYS
The Company has the right, but is not obliged to:

1. Make inspections and surveys at any time;

2. Give the Named Insured reports on the conditions the Company finds; and

3. Recommend changes.

Any inspections, surveys, reports or recommendations relate only to insurability and the premiums to be charged. The Company does not make safety inspections. The Company does not undertake to perform the duty of any person or organization to provide for the health or safety of workers or the public. The Company does not warrant that conditions:

Docusign Envelope ID: D5A978CB-C4D2-8E67-8372-4DEDEA7C8A26 406 891
California Premier Restoration
ECC-1315-0118 © 2018, Freberg Environmental, Inc. Page 2 of 2

1. Are safe or healthful; or

2. Comply with laws, regulations, codes or standards.

This condition applies not only to the Company, but also to any rating, advisory, rate service, engineering firm or similar organization which makes insurance inspections, surveys, reports or recommendations.
(5) NAMED INSURED AS AGENT
The Named Insured specified in the Declarations shall be deemed agent of each Insured with respect to all matters involving this Policy, however, the Company shall have the right to seek indemnification from any Insured or any other person who may be legally liable for the debts of the Named Insured. (6) PREMIUMS
The First Named Insured shown in the Declarations:

1. Is responsible for the payment of all premiums;

2. Will be the payee for any return premiums the Company pays; and

3. Is responsible for the payment of all deductibles and self-Insured retention amounts under this Policy.
(7) ADDITIONAL PREMIUMS
If, during the Policy Period, an increase in the risk or hazards covered hereunder occurs, the Company shall have the right to charge the appropriate additional premium. (8) TRANSFER OF RIGHTS AND DUTIES UNDER THIS POLICY
The rights and duties under this Policy may not be transferred without the Named Insured. If
an individual Named Insured dies, their rights and duties will be transferred to their legal representative, but only while acting within the scope of duties as such. Until the Named legal representative is appointed, anyone having proper temporary custody of the property will have their rights and duties but only with respect to that property.
(9) BANKRUPTCY OR INSOLVENCY
Bankruptcy or insolvency of the Insured or of the Insured Company of its obligations under the Policy.

All other terms and conditions under the Policy remain unchanged.

Docusign Envelope ID: D5A978CB-C4D2-8E67-8372-4DEDEA7C8A26 407 892
California Premier Restoration
ECC-1315-0118 © 2018, Freberg Environmental, Inc. Page 1 of 2 Endorsement Number: 1

COMMON POLICY CONDITIONS ENDORSEMENT
THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY.

In consideration of the premium charged, and notwithstanding anything contained in this Policy to the contrary, it is hereby agreed that all coverage parts included in this Policy are subject to the following conditions:

A. CANCELLATION
The Named Insured may cancel this Policy by mailing to the Company written notice stating when thereafter such cancellation shall become effective. The Company may cancel this Policy by mailing to the Named Insured, at the mailing address specified in the Declarations, written notice stating when not less than thirty (30) days thereafter such cancellation shall become effective, except in the event of the Named Insured’s nonpayment of premium, not less than ten (10) days advance notice of cancellation shall be given. The mailing of notice as stated above, shall be sufficient proof of either party's intent to cancel. The effective date of cancellation specified in such notice shall terminate the Policy Period. Delivery of such notice shall be equivalent to mailing.

If the Named Insured cancels, the earned premium shall be computed in accordance with the customary short rate table. If the Company cancels, the earned premium shall be computed pro rata. The Company will tender any return premium subject to retaining a minimum earned premium equal to 25% of the amount specified in the Declarations.

Premium adjustment may be made either at the time cancellation is effective or as soon as practicable thereafter, but tender of the unearned premium or return of this Policy, shall not be conditions precedent to cancellation hereunder.

B. CHANGES
The terms of this Policy shall not be amended, waived or otherwise changed, except by endorsement issued by the Company and made a part of this Policy.

C. EXAMINATION OF BOOKS AND RECORDS
The Company may examine and audit the Named Insured’s books and records as they relate to this Policy at any time during the Policy Period and up to three (3) years afterward.

D. INSPECTIONS AND SURVEYS
The Company has the right, but is not obliged to:

1. Make inspections and surveys at any time;

2. Give the Named Insured reports on the conditions the Company finds; and

3. Recommend changes.

Any inspections, surveys, reports or recommendations relate only to insurability and the premiums to be charged. The Company does not make safety inspections. The Company This endorsement, effective 03/17/2024, attaches to and forms a part of Policy Number FEI-ECC-23338-07.

Docusign Envelope ID: D5A978CB-C4D2-8E67-8372-4DEDEA7C8A26 408 893
California Premier Restoration
ECC-1315-0118 © 2018, Freberg Environmental, Inc. Page 2 of 2 does not undertake to perform the duty of any person or organization to provide for the health or safety of workers or the public. The Company does not warrant that conditions:

1. Are safe or healthful; or

2. Comply with laws, regulations, codes or standards.

This condition applies not only to the Company, but also to any rating, advisory, rate service, engineering firm or similar organization which makes insurance inspections, surveys, reports or recommendations.

E. NAMED INSURED AS AGENT
The Named Insured specified in the Declarations shall be deemed agent of each Insured with respect to all matters involving this Policy, however, the Company shall have the right to seek indemnification from any Insured or any other person who may be legally liable for the debts of the Named Insured.

F. PREMIUMS
The First Named Insured shown in the Declarations:
a. Is responsible for the payment of all premiums;
b. Will be the payee for any return premiums the Company pays; and c. Is responsible for the payment of all deductibles and self-Insured retention amounts under this Policy.

G. ADDITIONAL PREMIUMS
If, during the Policy Period, an increase in the risk or hazards covered hereunder occurs, the Company shall have the right to charge the appropriate additional premium.

H. TRANSFER OF RIGHTS AND DUTIES UNDER THIS POLICY
The Named Insured’s rights and duties under this Policy may not be transferred without the Company’s written consent except in the case of death of an individual Named Insured. If an individual Named Insured dies, their rights and duties will be transferred to their legal representative, but only while acting within the scope of duties as such. Until the Named Insured’s legal representative is appointed, anyone having proper temporary custody of the Named Insured’s property will have their rights and duties but only with respect to that property.

I. BANKRUPTCY OR INSOLVENCY
Bankruptcy or insolvency of the Insured or of the Insured’s estate will not relieve the Company of its obligations under the Policy.

All other terms and conditions under the Policy remain unchanged.

Docusign Envelope ID: D5A978CB-C4D2-8E67-8372-4DEDEA7C8A26 409 894
California Premier Restoration
ECC-548-0317 © 2018, Freberg Environmental, Inc. Page 1 of 1 Endorsement Number: 27
Automatic Primary and Non-Contributory Insurance Endorsement Designated Work Or Project(s)
This endorsement, effective 03/17/2025, attaches to and forms a part of Policy Number FEI-ECC-23338-08.

THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY.

This endorsement modifies insurance provided under the Coverage Part(s) indicated below:

CONTRACTORS POLLUTION LIABILITY

COMMERCIAL GENERAL LIABILITY

SCHEDULE
Name of Person or Organization:

Any person(s) or organization(s) whom the Named Insured agrees, in a written contract, to provide Primary and/or Non-contributory status of this insurance. However, this status exists only for the project specified in that contract.

In consideration of an additional premium of $Applied, and notwithstanding anything contained in this policy to the contrary, it is hereby agreed that this policy shall be considered primary to any similar insurance held by third parties in respect to work performed by you under any written contractual agreement with such third party. It is further agreed that any other insurance which the person(s) or organization(s) named in the schedule may have is excess and non-contributory to this insurance.

Docusign Envelope ID: D5A978CB-C4D2-8E67-8372-4DEDEA7C8A26 410 895
City of Salinas
Legislation Text
200 Lincoln Ave., Salinas,
CA 93901
www.salinas.gov
File #: ID#26-368, Version: 1
Direct Purchase of Speed Cushions for Traffic Calming
Approve a Resolution authorizing the Purchasing Agent to complete the direct purchase of speed cushions from Traffic Logix for traffic calming projects for a not to exceed total of $1,000,000 for the Traffic Calming Program CIP 9163.

City of Salinas Page 1 of 1 Printed on 7/30/2026
powered by Legistar™411
Page | 1

CITY OF SALINAS

COUNCIL STAFF REPORT
DATE: AUGUST 4, 2026
DEPARTMENT: PUBLIC WORKS DEPARTMENT
FROM: DAVID JACOBS, P.E., L.S., PUBLIC WORKS DIRECTOR
BY: ADRIANA ROBLES, P.E., C.F.M., CITY ENGINEER

GERARDO RODRIGUEZ, ASSISTANT ENGINEER
TITLE: PURCHASE OF SPEED CUSHIONS FOR TRAFFIC CALMING
RECOMMENDED MOTION:

A motion to approve a Resolution authorizing the direct purchase of speed cushions from Traffic Logix for traffic calming projects for a not to exceed total of $1,000,000 for the Traffic Calming Program CIP 9163.

EXECUTIVE SUMMARY:

Following the 2009 adoption of the Neighborhood Traffic Management Program, staff updated the Traffic Calming Policy and secured augmented funding in the 2026, biennial budget to address 15 of the 27 pending traffic calming requests. Under Salinas Municipal Code Section 12-03.05, purchases exceeding $250,000 require competitive sealed bids; however, Council may authorize a direct purchase if competitive bidding does not serve the City's best interest. Because Traffic Logix supplied equipment for all, but four of the traffic calming projects installed, utilizing them ensures system uniformity, reduces labor costs, and simplifies parts management. Therefore, staff recommends approving a Resolution authorizing the direct purchase of speed cushions from Traffic Logix for all applicable projects under Traffic Calming Program CIP 9163 to expedite the process and installation.

BACKGROUND:

On October 6, 2009, City Council adopted the Neighborhood Traffic Management Program and established the City’s Traffic Calming Policy (Resolution No. 19674). The program was established to address traffic concerns from residential neighborhoods. Traffic calming has a range of proven benefits to a community, including reducing speeding, lowering fatality rates, decreasing injury severity, reducing traffic noise, increasing pedestrian and bicyclist safety, and improving street aesthetics. Although the program was established in 2009, the first traffic calming project was not implemented until 2016 due to lack of funding. In 2017 and following an overwhelming number of traffic calming requests received, City Council approved a prioritization criterion that would allow for ranking of requests (Resolution No. 21291). 412
Page | 2
In 2025, staff hosted two study sessions with the Traffic and Transportation Commission and two community meetings to gather feedback on proposed policy updates. The primary concern raised by residents was the excessive length of time required to implement traffic calming measures.

Over the past year, staff reviewed the existing Traffic Calming Policy to identify administrative bottlenecks and opportunities to expedite the process. The resulting policy updates focus on three key areas: refining the prioritization criteria, eliminating procedural delays, and optimizing the implementation to significantly expedite project installation.

As part of this year’s budget process, staff proposed a one-time budget augmentation for traffic calming to the Finance Committee that would allow installation of speed cushions to address 15 of the 27 pending traffic calming requests. On June 16, 2026, City Council approved the biennial budget which allocated the additional funding to traffic calming.

For general purchases, pursuant to Salinas Municipal Code (SMC) Section 12-03.05, except as otherwise directed by the City Council or pursuant to subsection (b)… whenever the amount to be expended for any purchase in excess of two hundred-fifty thousand dollars the Purchasing Agent shall advertise for sealed bids and the contract of purchase shall be awarded to the lowest responsible bidder. A direct purchase may be authorized by the City Council if it is determined that low-bid based competition is not likely to serve the best interests of the City, yield the best value to the City, or result in the lowest price.

For the past ten years, Traffic Logix has provided speed cushions for nearly all of the City’s traffic calming installations, with only four exceptions where other traffic calming measure were used.

Continuing to purchase from this vendor serves the City's best interest and offers the highest value, as staff has secured lower pricing. Furthermore, standardizing equipment across the City reduces maintenance expenses and streamlines ordering of parts, thereby reducing labor costs. City Council previously authorized direct purchases from Traffic Logix in October 2019 (Resolution No. 21726) and in October 2020 (Resolution No. 21979). During the October 13, 2020 meeting, Council formally designated Traffic Logix as the sole source provider for the City’s Traffic Calming Program. To expedite the process and installation, staff, again, is requesting approval of the direct purchase of speed cushions from Traffic Logix with a not to exceed of $1,000,000.

CEQA CONSIDERATION:

The City of Salinas has determined that the project, installation of speed cushions, is exempt from the California Environmental Quality Act (CEQA) Guidelines (Section 15301, Class 1) because the project consists of the operation, repair, or minor alteration of public streets involving no expansion of use. There would be no significant effect on the environment.

CALIFORNIA GOVERNMENT CODE §84308 APPLIES:

No.
413
Page | 3
STRATEGIC PLAN INITIATIVE:

The City’s Traffic Calming Program supports Council goals of Infrastructure and Public Safety.

DEPARTMENTAL COORDINATION:

Public Works staff manages the Salinas Neighborhood Traffic Management Program. Public Works staff have coordinated with the Salinas Fire Department on the selection of the speed cushions with the wheel slot gap and support of the installation. PW Staff have coordination with Salinas Police Department for temporary speed enforcement through radar feedback trailers and traffic calming enforcement assistance.

FISCAL AND SUSTAINABILITY IMPACT:

The amount requested for approval is subject to budget availability and additional appropriation of funds.

Fund General Ledger Number
(Operating/CIP)
General Ledger Account
Name
Remaining Budget
Appropriation
Amount Requested
2510 50.9163-66.4000 Improvements $650,000 $1,000,000
ATTACHMENTS:

Resolution
Resolution No. 21726
Resolution No. 21979
414
Page | 1
RESOLUTION NO.

A RESOLUTION AUTHORIZING THE DIRECT PURCHASE OF SPEED CUSHIONS

FROM TRAFFIC LOGIX FOR TRAFFIC CALMING PROJECTS FOR A NOT TO EXCEED TOTAL OF $1,000,000 FOR THE TRAFFIC CALMING PROGRAM CIP 9163.

WHEREAS, City Council adopted the Neighborhood Traffic Management Program and established the City’s Traffic Calming Policy at its October 6, 2009, meeting (Resolution No. 19764) which outlined a process for consideration of traffic calming requests from the community; and
WHEREAS, City Council through Resolution No. 19764 delegated authority to the City Engineer to make revisions to the program to ensure its effectiveness; and WHEREAS, the City Council approved a prioritization strategy for Traffic Calming requests on its November 7, 2017, meeting (Resolution No. 21291); and WHEREAS, in 2025, staff hosted two study sessions with the Traffic and Transportation Commission and two community meetings to gather feedback on proposed policy updates. The primary concern raised by residents was the excessive length of time required to implement traffic calming measures; and
WHEREAS, the Salinas Municipal Code Sections 12-03.05 requires competitive bidding for purchases in excess of $250,000, limiting direct purchasing, unless it yields the best value for the City; and
WHEREAS, for the past ten years, Traffic Logix has provided speed cushions for nearly all of the City’s traffic calming installations; and
WHEREAS, continuing to purchase from Traffic Logix serves the City’s best interest and offers the highest value, as staff has secured lower pricing. Furthermore, standardizing equipment across the City reduces maintenance costs and streamlines ordering of parts, thereby also reducing labor costs.

NOW, THEREFORE, BE IT RESOLVED that pursuant to Salinas Municipal Code Section 12-03.11 the Salinas City Council approves a Resolution authorizing the Purchasing Agent to complete the direct purchase of speed cushions from Traffic Logix for traffic calming projects for a not to exceed total of $1,000,000 for the Traffic Calming Program CIP 9163.

PASSED AND APPROVED this 4
th day of August, 2026, by the following vote:

AYES:

NOES:

ABSENT:
415
Page | 2
ABSTAIN:

APPROVED:
_______________________
Dennis Donohue, Mayor
ATTEST:
_________________________
Patricia M. Soratos, City Clerk
416
RESOLUTION NO. 21726 (N.C.S.)

A RESOLUTION AUTHORIZING THE DIRECT PURCHASE OF SPEED CUSHIONS

FROM TRAFFIC LOGIX
WHEREAS, Speed Cushion from Traffic Logix have been installed at various neighborhoods throughout the City of Salinas as part of the Neighborhood Traffic Management Program; and
WHEREAS, the City Council can approve this purchase pursuant to Salinas Municipal Code Sections 12-25 (cooperative purchases) and 12-27 (purchases without notice, advertising or competitive bids) in contracting for equipment, materials, supplies and services; and without application of the local purchasing preference pursuant to Salinas Municipal Code Section 12-

28.080.

NOW, THEREFORE, BE IT RESOLVED by the Salinas City Council that the Purchasing Officer is hereby authorized to direct purchase Speed Cushion from Traffic Logix for a total amount of $84,701 as specified in the Staff Report and the attachments thereto which accompany this Resolution, using funds from CIP 9163.

PASSED AND APPROVED this 22nd day of October 2019 by the following vote:

AYES: Councilmembers: Barrera, Cromeenes, Davis, De La Rosa and Mayor Gunter NOES: None
ABSENT: Councilmember McShane and Villegas
ABSTAIN: None
APPROVED:
_________________
Joe Gunter, Mayor
ATTEST:
_________________________
Patricia M. Barajas, City Clerk
DocuSign Envelope ID: 21961935-D452-42A6-A961-D41DCC1E7279 417
RESOLUTION NO. 21979 (N.C.S.)

A RESOLUTION AUTHORIZING THE DIRECT PURCHASE OF SPEED CUSHIONS

FROM TRAFFIC LOGIX
WHEREAS, Capital Improvement Project 9163 (Traffic Calming) funds are allocated to reduce speeding and reduce traffic volumes in neighborhoods; and WHEREAS, Speed Cushion from Traffic Logix have been installed at various neighborhoods throughout the City of Salinas as part of the Neighborhood Traffic Management Program; and
WHEREAS, the City Council may approve this purchase pursuant to Salinas Municipal Code Sections 12-25 (cooperative purchases) and 12-27 (purchases without notice, advertising or competitive bids) in contracting for equipment, materials, supplies and services; and without application of the local purchasing preference pursuant to Salinas Municipal Code Section 12-

28.080.

NOW, THEREFORE, BE IT RESOLVED that the Salinas City Council approves the direct purchase Traffic Logix speed cushions for approved Traffic Calming projects as specified in the Staff Report and the attachments thereto which accompany this Resolution, using funding from CIP 9163.

PASSED AND APPROVED this 13th day of October 2020, by the following vote:

AYES: Councilmembers: Barrera, Davis, McShane, Villegas and Mayor Pro Tem Cromeenes NOES: None
ABSENT: Councilmember De La Rosa
ABSTAIN: None
APPROVED:
______________________________
Christie Cromeenes, Mayor Pro Tem
ATTEST:
_________________________
Patricia M. Barajas, City Clerk
DocuSign Envelope ID: 6E2D0966-5628-4FE4-BF53-4AFEC16030B3 418
City of Salinas
Legislation Text
200 Lincoln Ave., Salinas,
CA 93901
www.salinas.gov
File #: ID#26-376, Version: 1
An Extension of the Urgency Interim Ordinance Prohibiting the Issuance of Tobacco Retailers’ Licenses Consider extending the Urgency Interim Ordinance No. 2697(NCS) prohibiting the issuance of Tobacco Retailers’ Licenses citywide for an additional 10 months and 15 days.

City of Salinas Page 1 of 1 Printed on 7/30/2026
powered by Legistar™419
Page | 1

CITY OF SALINAS

COUNCIL STAFF REPORT
DATE: AUGUST 4, 2026
DEPARTMENT: ADMINISTRATION

OFFICE OF THE CITY ATTORNEY

COMMUNITY DEVELOPMENT
FROM: ERNESTO LIZAOLA, ASSISTANT TO THE CITY MANAGER
THROUGH: CHRISTOPHER A. CALLIHAN, CITY ATTORNEY

LISA BRINTON, DIRECTOR
TITLE: EXTENSION OF THE URGENCY INTERIM ORDINANCE
PROHIBITING THE ISSUANCE OF TOBACCO RETAILERS’
LICENSES FOR THE PERIOD NOT TO EXCEED 10 MONTHS
AND 15 DAYS
RECOMMENDED MOTION:

A motion to extend Urgency Interim Ordinance No. 2697(NCS) prohibiting the issuance of Tobacco Retailers’ Licenses citywide for an additional 10 months and 15 days. A four-fifths vote (i.e., five affirmative votes) is required in order for the proposed extension to take effect.

EXECUTIVE SUMMARY:

The proposed extension of Urgency Interim Ordinance No. 2697(NCS) will prolong the temporary moratorium on the issuance of Tobacco Retailers’ Licenses citywide for an additional 10 months and 15 days, to allow the City additional time to study best practices and develop a more comprehensive regulatory framework for tobacco retailers. The extension would not affect existing licenses or the renewal of existing licenses. The proposed extension is pursuant to California Government Code Section 65858, which allows for extension of such urgency interim ordinance.

If adopted by the City Council, the moratorium on the issuance of Tobacco Retailers’ Licenses will be extended from August 14, 2026 to June 29, 2027. This staff report serves as the 10-day report required by California Government Code Section 65858(d).

BACKGROUND:

On June 30, 2026, pursuant to California Government Code Section 65858, the Salinas City Council adopted Urgency Interim Ordinance No. 2697(NCS) prohibiting the issuance of Tobacco 420
Page | 2
Retailers’ Licenses for a period of 45 days. The current 45-day temporary moratorium expires on August 14, 2026.

During this initial 45-day period, City staff identified key actions the City can undertake to alleviate the threat to public health, welfare, and safety posed by the adverse effects associated with tobacco products and retailers, especially as it relates to access and exposure to minors. This includes, but not limited to, addressing licensing enforcement; reviewing best practices from other jurisdictions; analyzing police data from crime and violation patterns; and compiling and analyzing list of existing tobacco retailers in relation to population density and proximity to youth-populated areas. The proposed extension will allow the City additional time to study best practices and develop a more comprehensive regulatory framework for tobacco retailers.

If approved, the proposed extension of 10 months and 15 days for the moratorium on the issuance of Tobacco Retailers’ Licenses will take effect from August 14, 2026 to June 29, 2027. If needed, pursuant to California Government Code Section 65858, the ordinance can be extended a second time for an additional year prior to June 29, 2027.

City staff have started to engage community partners and other stakeholders as we evaluate possible changes to the issuance and the regulation of the Tobacco Retailers’ Licenses. Thus far, we have engaged with the Monterey County Health Department, Monterey County Office of Education, California Fuels & Convenience Alliance (CFCA), and other local municipalities to gather information and feedback. In the coming months, we will continue to engage these and other stakeholders to inform and guide possible changes to our existing process and policies.

This extension of the Urgency Interim Ordinance No. 2697(NCS) directly responds to concerns Salinas residents have shared about public health, neighborhood safety, and youth exposure in areas with high concentration of tobacco retailers and smoke shops. The City does not currently have any restrictions on the proximity of tobacco retail sales to youth-populated areas such as schools, parks, recreation centers, and/or childcare centers. To address these problems, many municipalities across California have enacted limits on the number of retailers’ licenses that can be issued based on per capita and/or geographical factors.

The City is in the process of reviewing and updating its General Plan (Visión Salinas 2040) and Zoning Code (Chapter 37 of the Salinas Municipal Code), as well as its regulations on commercial cannabis businesses and tobacco retail businesses. This presents an opportunity to evaluate and to address the foregoing concerns with which the uses currently authorized by tobacco retailers’ licenses may be in conflict.

CEQA CONSIDERATION:

Not a Project. The City of Salinas has determined that the proposed action is not a project as defined by the California Environmental Quality Act (CEQA) (CEQA Guidelines Section 15378).

In addition, CEQA Guidelines Section 15061 includes the general rule that CEQA applies only to 421
Page | 3
activities which have the potential for causing a significant effect on the environment. Where it can be seen with certainty that there is no possibility that the activity in question may have a significant effect on the environment, the activity is not subject to CEQA. Because the proposed action and this matter have no potential to cause any effect on the environment, or because it falls within a category of activities excluded as projects pursuant to CEQA Guidelines section 15378, this matter is not a project. Because the matter does not cause a direct or foreseeable indirect physical change on or in the environment, this matter is not a project. Any subsequent discretionary projects resulting from this action will be assessed for CEQA applicability.

CALIFORNIA GOVERNMENT CODE §84308 APPLIES:

No.

STRATEGIC PLAN INITIATIVE:

The City Council’s adoption of this urgency interim ordinance does not directly address any of the City Council’s Strategic Goals; however, the urgency interim ordinance would provide measures that help prevent youth access to tobacco products.

DEPARTMENTAL COORDINATION:

The City Manager’s Office coordinated with the Community Development Department and the City Attorney’s Office on the preparation of this urgency interim ordinance and this Report.

FISCAL AND SUSTAINABILITY IMPACT:

Adopting this urgency interim ordinance will have no direct fiscal impact on the General Fund.

ATTACHMENTS:

Draft Extension of Urgency Interim Ordinance
422
ORDINANCE NO. ___________(N.C.S)
AN EXTENSION OF URGENCY INTERIM ORDINANCE NO. 2697(NCS) OF THE CITY OF

SALINAS, ADOPTED PURSUANT TO CALIFORNIA GOVERNMENT CODE SECTION 65858 TEMPORARILY PROHIBITING THE ISSUANCE OF TOBACCO RETAILERS’

LICENSES
City Attorney Summary
The proposed extension of Urgency Interim Ordinance No. 2697(NCS) will prolong the temporary moratorium on the issuance of Tobacco Retailers’ Licenses citywide for an additional 10 months and 15 days. The extension would not affect existing licenses or the renewal of existing licenses.

The proposed extension is pursuant to California Government Code Section 65858, which allows for extension of such interim ordinance. If adopted by the City Council, the moratorium on the issuance of Tobacco Retailers’ Licenses will be extended from August 14, 2026 to June 29, 2027.

The City Council of the City of Salinas finds and declares as follows:

A. The City of Salinas is a municipal corporation duly organized as a charter city under the California Constitution and laws of the State of California.

B. The City Council has broad discretion pursuant to Article XI, Section 5 of the California Constitution, and the general laws of the state to adopt and enforce ordinance and regulations to protect and promote the public health, safety, and welfare of its residents.

C. The City of Salinas is charged with the responsibility of ensuring the orderly and equitable enforcement of local, state and federal law.

D. California Government Code Section 65858 sets forth procedures for the adoption of an urgency interim ordinance to prohibit the approval of applications for additional subdivisions, use permits, variances, building permits, and other applicable entitlements for uses that may be in conflict with a contemplated specific plan or zoning proposal that the legislative body, planning commission or the planning department is considering or studying or intends to study.

E. On January 6, 2015, the City of Salinas adopted an Ordinance requiring all tobacco retailers to obtain a “Tobacco Retailer License” to ensure that retailers comply with tobacco control laws and City business standards (Ord. No. 2555(NCS), § 1, 1-6-2015; Salinas Municipal Code section 16-119.1).

F. While many tobacco retailers in the City operate as grocery stores, liquor stores, gas stations, convenience stores, in recent years the City has seen an increase in the number of standalone “Smoke Shop” tobacco retail stores.
423
G. The City does not currently have any restrictions on the proximity of tobacco retail sales to youth-populated areas such as schools, parks, recreation centers, and/or childcare centers.

H. As of June 2026, there are 125 tobacco retailers in the City of Salinas. Currently, there are no limits on the number of tobacco retailers that can operate within the City.

I. In California, individuals under the age of 21 are prohibited from purchasing or using tobacco products. This regulation is based on evidence that smoking is the leading cause of preventable disease and mortality worldwide. Smokeless tobacco is also associated with increased risk for several cancers, including those of the mouth, esophagus, and pancreas.

J. A 2025 California Synar Tobacco Purchase Survey shows that tobacco stores, smoke shops, and liquor stores tend to have higher violation rates as it relates to unlawful sale of tobacco products to minors.

K. Findings from an Online California Adult Tobacco Survey (Online CATS), a survey funded by the California Department of Public Health, found that approximately half (53.3%) of Californians reported being exposed to either secondhand tobacco smoke or secondhand vape in the past two weeks in 2023.

L. The prevalence of tobacco retail establishments in the City of Salinas may contribute to various adverse effects because of the associated health risks and density to walkable areas where minors frequent. In addition, social and economic burdens due to smokingrelated illnesses place demands on community health resources and increase healthcare costs. Tobacco retailer businesses may be affiliated with the sale of illegal cannabis products and drug paraphernalia that encourage illegally activity. Marketing of tobacco products is often aimed towards children featuring colorful packaging designs and sweet candy flavors.

M. The City is in the process of reviewing and updating its General Plan (Visión Salinas 2040) and Zoning Code (Chapter 37 of the Salinas Municipal Code), as well as its regulations on commercial cannabis businesses and tobacco retail businesses, to address the foregoing concerns with which the uses currently authorized by tobacco retailers’ licenses may be in conflict.

N. Considering the foregoing findings, the City Council finds there is a current and immediate threat to public health, safety, and welfare, and that approval of additional tobacco retailers’ licenses would result in and exacerbate that threat to public health, safety, or welfare.

O. On June 30, 2026, pursuant to California Government Code Section 65858, the Salinas City Council adopted Urgency Interim Ordinance No. 2697(NCS) prohibiting the issuance of Tobacco Retailers’ Licenses for a period of 45 days.
424
P. Within the 45-day period, City staff prepared a 10-day report, as required by California Government Code Section 65858, identifying key actions the City can undertake to alleviate the threat to public health, welfare, and safety posed by the adverse effects associated with tobacco products and retailers, especially as it relates to minors. This includes, but not limited to, addressing licensing enforcement; reviewing best practices from other jurisdictions; analyzing police data from crime and violation patterns; compiling and analyzing list of existing tobacco retailers in relation to population density and proximity to youth-populated areas.

Q. Pursuant to Government Code section 65858, Urgency Interim Ordinance No. 2797(NCS) can be extended for a duration of 10 months and 15 days to allow the City additional time to study best practices and develop a more comprehensive regulatory framework for tobacco retailers.

R. The extension of this interim ordinance is statutorily exempt from the California Environmental Quality Act because it is an urgency interim ordinance necessary to protect the City and its residents from a current and immediate threat to public health, safety, and welfare.

S. On August 4, 2026, in accordance with State law, the City Council provided due consideration of all evidence presented and provided and held a duly noticed public heating and took testimony regarding extension of Urgency Interim Ordinance No. 2797(NCS) which will extend the moratorium on the issuance of Tobacco Retailers’ Licenses from August 14, 2026 to June 29, 2027.

SECTION 1. RECITALS.

The above recitals are true and correct and hereby adopted as the City Council’s findings.

SECTION 2: PURPOSE; APPLICABILITY.

In the interest of protecting the health, safety, and welfare of the residents in the city of Salinas, it is the purpose and intent of this urgency interim ordinance to extend the temporary moratorium on the issuance of any new license, permit, or other entitlement for any tobacco retail business.

This includes any new license, permit, or other entitlement for the establishment of any new tobacco retail business falling under the definition of “Tobacco retailer” engaged in “Tobacco retailing” as defined in Chapter 7.80 of the Monterey County Code.

The extension of Urgency Interim Ordinance No. 2696(NCS) applies to all areas within the limits of the City of Salinas.
425
The City Council has authority to extend this ordinance pursuant to California Government Code section 65858 as an urgency measure prohibiting any use that may be in conflict with a contemplated general plan, specific plan, or zoning proposal that the City is considering or studying.

SECTION 3: REGULATIONS.

Prohibition on the issuance of new Tobacco Retailers’ Licenses. These regulations apply during the term of this interim ordinance and any duly adopted extension of this interim ordinance, unless a specific exemption under this ordinance is applicable. This moratorium shall not apply to the renewal of an existing Tobacco Retailers’ License previously issued by the City of Salinas or the County of Monterey on behalf of the City of Salinas.

SECTION 4: ENFORCEMENT.

Any violation of this interim ordinance is unlawful and a public nuisance. In the event of a violation of this ordinance, the City may, in the discretion of the City Attorney, in addition to all other remedies, take such enforcement action as is authorized under the Salinas Municipal Code and such other enforcement action as is authorized under the law.

SECTION 5: EFFECTIVE DATE.

This ordinance becomes effective immediately upon the approval of four-fifths (4/5) of the City Council and will terminate on June 29, 2027, unless extended before then by the City Council in accordance with California Government Code Section 65858.

SECTION 6: NO TAKING OF PROPERTY RIGHT INTENDED.

Nothing in this ordinance will be interpreted to affect an unconstitutional taking of the property right of any person. If the City Council determines, based on specific evidence in the administrative records, that the applicability of one or more provisions of this ordinance to a proposed project would affect an unconstitutional taking of a property right, the City Council shall disregard such provision or provisions to the extent necessary to avoid such unconstitutional taking.

SECTION 7: SEVERABILITY.

If any section, subsection, sentence, clause, or phrase of this ordinance is for any reason held invalid by a court of competent, such a decision shall not affect the validity of the remaining portions of this ordinance. The City Council declares that it would have passed this ordinance and each section, subsection, sentence, clause, or phrase thereof, irrespective of the fact that one or more sections, subsections, clauses, or phrases, be declared invalid. 426
SECTION 8: PUBLICATION.

The City Clerk shall cause a summary of this ordinance to be published once in a newspaper published and circulated in Salinas within fifteen (15) days after adoption. (Salinas Charter Section 11.9)
PASSED and ADOPTED this 4th day of August 2026, by the following vote:

AYES:

NOES:

ABSENT:

ABSTAIN:

APPROVED:
__________________________________
Dennis Donohue, Mayor
APPROVED AS TO FORM:
_____________________________________
Christopher A. Callihan, City Attorney
ATTEST:
______________________________________
Patricia M. Soratos, City Clerk
427
City of Salinas
Legislation Text
200 Lincoln Ave., Salinas,
CA 93901
www.salinas.gov
File #: ID#26-360, Version: 1
Commercial Cannabis Permit 2025-004; Appeal of Planning Commission upholding the Selection Committee denial of a Major Amendment to Commercial Cannabis Permit 2024-009 to relocate from 1610 Moffett Street to 2033 North Main Street in the Commercial Retail - West Boronda Road at U.S. 101 Gateway Overlay (CR-GW-1) Zoning District
Approve a Resolution finding the action is not a project as defined by the California Environmental Quality Act (CEQA) (CEQA Guidelines Section 15378) and exempt pursuant to CEQA Guidelines Section 15061 which includes the general rule that CEQA applies only to activities which have the potential for causing a significant effect on the environment; and affirming the Planning Commission’s upholding of the Selection Committee’s denial of Emerald Skyway LLC’s (doing business as “Valley Farms”) request to amend Commercial Cannabis Permit 2024-009 (Commercial Cannabis Permit 2025-004) to relocate from 1610 Moffett Street to 2033 North Main Street within proximity of sensitive uses per Municipal Code Section 5-07.27.

City of Salinas Page 1 of 1 Printed on 7/30/2026
powered by Legistar™428
Page | 1

CITY OF SALINAS

CITY COUNCIL STAFF REPORT
DATE: AUGUST 4, 2026
DEPARTMENT: COMMUNITY DEVELOPMENT DEPARTMENT
FROM: LISA BRINTON, COMMUNITY DEVELOPMENT DIRECTOR
THROUGH: COURTNEY GROSSMAN, PLANNING MANAGER
BY: THOMAS WILES, SENIOR PLANNER
TITLE: COMMERCIAL CANNABIS PERMIT 2025-004; APPEAL OF

PLANNING COMMISSION UPHOLDING THE SELECTION

COMMITTEE DENIAL OF A MAJOR AMENDMENT TO
COMMERCIAL CANNABIS PERMIT 2024-009 TO RELOCATE
FROM 1610 MOFFETT STREET TO 2033 NORTH MAIN STREET
IN THE COMMERCIAL RETAIL – WEST BORONDA ROAD AT
U.S. 101 GATEWAY OVERLAY (CR–GW-1) ZONING DISTRICT
RECOMMENDED MOTION:

A motion to approve a resolution as follows:

1. Find the action is not a project as defined by the California Environmental Quality Act (CEQA) (CEQA Guidelines Section 15378) and exempt pursuant to CEQA Guidelines Section 15061 which includes the general rule that CEQA applies only to activities which have the potential for causing a significant effect on the environment; and

2. Affirm the Planning Commission’s upholding of the Selection Committee’s denial of Emerald Skyway LLC’s (doing business as “Valley Farms”) request to amend Commercial Cannabis Permit 2024-009 (Commercial Cannabis Permit 2025-004) to relocate from 1610 Moffett Street to 2033 North Main Street within proximity of sensitive uses per Municipal Code Section 5-07.27.

EXECUTIVE SUMMARY:

On November 21, 2025, the Applicant, Emerald Skyway LLC (doing business as “Valley Farms”), submitted Commercial Cannabis Permit 2025-004 for a major amendment (“Amendment 429
Page | 2
Application”) to Commercial Cannabis Permit 2024-009 (“CCP 2024-009”) to relocate an existing Cannabis Dispensary with accessory Delivery and Distribution from 1610 Moffett Street to 2033 North Main Street. Following the City Attorney’s determination that the Amendment Application contained all the required information, the Amendment Application was forwarded to the Selection Committee appointed by the City Manager for their review in accordance with Article VII of Chapter 5 of the Salinas Municipal Code.

On April 13, 2026, the Selection Committee met to consider the Amendment Application and at that meeting denied the Amendment Application. On April 21, 2026, pursuant to Municipal Code Section 5-07.10, Valley Farms submitted an appeal of the Selection Committee’s denial (see attached Appeal Letter dated April 21, 2026). On June 3, 2026, the Planning Commission upheld the Selection Committee’s denial of the Amendment Application (see Planning Commission Resolution No. 2026-05). On June 9, 2026, pursuant to Municipal Code Section 5-07.10, Valley Farms submitted an appeal of the Planning Commission’s upholding of the Selection Committee’s denial to the City Council (see attached Appeal Letter dated June 9, 2026).

DISCUSSION:

Background:

The proposed site is owned by Northridge Plaza, LLC and is located at 2203 North Main Street [Assessor Parcel Number (APN): 253-061-025-000]. The commercial cannabis business would be located within an approximately 2,733 square-foot tenant space in the Northridge Plaza Shopping Center at the northwest corner of North Main Street and Boronda Road across Boronda Road from the Northridge Mall Shopping Center. The site consists of approximately 1.98-acres and is located in the Commercial Retail – West Boronda Road at U.S. 101 Gateway Overlay (CRGW-1) Zoning District. The following provides an overview of the land uses and zoning districts adjacent to the proposed site:

North: Multi-family Residential and Commercial/Residential High Density-West Boronda Road @ U.S. 101 (R-H-2.1-GW-1) and Commercial Retail (CR) South: Northridge Mall Shopping Center/Commercial Retail (CR) East: Multi-family Residential and Commercial/Residential High Density (R-H2.1) and Commercial Retail (CR) West: U.S. Highway 101
Commercial Cannabis Permits-Amendment Procedures
The holder of a Commercial Cannabis Permit (CCP) issued by the City may request an Amendment pursuant Municipal Code Section 5-07.09. The applicant may request a change to the business location subject to the following requirements:
(1) The applicant shall submit all items normally required for a new application, except that information related to the principals or operations that will remain 430
Page | 3
unchanged and are not directly related to the site may be excluded. (2) The selection committee shall review the proposed new site. The selection committee may approve an amendment to the permit authorizing the new site if it can make the following findings:
a. The new site would not be located within the distances specified in Section 5-07.27, unless an exception is approved pursuant to that section. b. The relocation to the new site would not create any significant negative impacts greater than those that existed at the original site. c. The proposed location is located in an appropriate zoning district for the proposed use.
d. Owners of real property located within three hundred feet of the proposed site have been notified and have had the opportunity to provide information to the city regarding the proposed site.

Commercial Cannabis Permit 2025-004
Valley Farms has been in pursuit of relocation since 2022 as reflected in the record with the request for five (5) separate Zoning Information Letters as shown in Table 1: Zoning Information Letters.

All five (5) Zoning Information Letters are attached to this staff report. The June 3, 2026 Planning Commission Staff Report also included five letters, but one was requested by another party, while another was omitted. Table 1 has been modified to accurately reflect the record.

Table 1: Zoning Information Letters
Case Number Date of
Letter
Address Sensitive Uses

1. ZLTR 2022-011 12/14/22 2033 N Main Street
(Diane Findley)
7; One school, five alcohol-related uses, and a
smoke shop

2. ZLTR 2023-002 4/26/23 245 Merced Street
(Diane Findley)
9; Seven alcohol-related uses and two churches.

3. ZLTR 2024-006 5/9/24 61 Tarp Circle
(Emerald Skyway)
6; One park and recreation facility, two religious
assembly facilities, and three alcohol-related uses

4. ZLTR 2024-010 6/11/24 240 W Market Street
(Emerald Skyway)
4; One religious assembly facility, one alcoholrelated use and two residential uses 431
Page | 4

5. ZLTR 2025-007 11/21/25
revised on
12/15/25
2033 N Main Street
(Michalah Frey -
Emerald Skyway)
10; One elementary school, seven alcohol-related
uses, one smoke shop, and one site zoned for
multi-family residential uses
Valley Farms retail operations on Moffett Street were not Zoning compliant. Valley Farms dispensary was originally approved on December 28, 2017 as CCP 2017-004 under the name Emerald Skyway LLC. The original permit was connected to two other permits: CCP 2017-003 for Cultivation and CCP 2017-002 for Manufacturing. With the manufacturing permit, the retail dispensary was considered accessory. According to City records, the other two permits were not initiated. Therefore, upon abandonment of the manufacturing permit, the retail dispensary was not permitted.

Analysis:

Pursuant to State Law, the proposed site must not be located within a 600-foot radius of a day care, preschool, private/charter school or school. In addition, pursuant to Municipal Code Section 5-

07.27(a), no Commercial Cannabis Business may operate within 1,000 feet of any of the following sensitive uses:
(1) School, college or university (including public, private, charter, and other nontraditional schools, but excluding trade schools that exclusively serve adults at least eighteen years of age);
(2) Park, daycare center, library, or publicly-owned and operated recreational facility; (3) Church or other house of worship;
(4) Smoke-shops, hookah lounges or businesses engaged in the same or a similar activity, and locations where alcohol is sold or served for individual consumption on or off the premises;
(5) Card rooms and retail firearm sales businesses;
(6) Any other commercial cannabis business operating as a dispensary, excepting therefrom the occasional and transient operation of a commercial cannabis delivery business, or
(7) Any other public or private business or facility where the presence of the commercial cannabis activity would cause a public nuisance or other situation which may result in repeated police department response.

The proposed location at 2033 North Main Street is within a 1,000-foot radius (measured from parcel to parcel) from the ten (10) identified sensitive uses listed Municipal Code Section 5-

07.27(a)(1) and (4) and shown on Table 2: Distance to Sensitive Uses below. 432
Page | 5
Table 2: Distance to Sensitive Uses
Address Use Distance
Parcel to Parcel Building
to Building
Business Name

1. 2014 Santa Rita Street School 995 feet away

1,360 feet away Santa Rita
Elementary School

2. 2015 N. Main Street On-site alcohol
sales
Same parcel 180 feet away El Michoacano
Restaurant

3. 2010 N. Main Street Off-site alcohol
sales
105 feet away

450 feet away Fish & Chips

4. 2087 N. Main Street Off-site alcohol
sales
505 feet away

570 feet away La Consentida
Market

5. 1988 N. Main Street On-site alcohol
sales
242 feet away

660 feet away Buffalo Wild Wings

6. 2068 N. Main Street Off-site alcohol
sales
560 feet away

590 feet away 7-Eleven

7. 1962 N. Main Street Off-site alcohol
sales
242 feet away

950 feet away Foodmaxx

8. 1912 N. Main Street Smoke Shop 242 feet away

1,300 feet away Santa Rita Smoke
Shop

9. 2034 N. Main Street Off-site alcohol
sales
110 feet away

334 feet away Tony’s market

10. 95 Castro Street Residential Adjacent

57 feet away 93 North Apartments
Police Department Comments:

Per Municipal Code Section 5-07.27(d), no commercial cannabis business may operate within any residential area or district of the city or adjacent to a residential area or district if, in the opinion of the Chief of Police or the Community Development Director, the operation of a commercial cannabis business in such location would tend to cause a public nuisance or a situation which may result in repeated police department response or a negative impact on the adjacent residential units. Staff notes there is an existing multi-family residential development located at 95 Castro Street adjacent to the north of the site.

Per the attached Memorandum dated March 16, 2026, the Police Chief is not aware of any information or conditions sufficient to form an opinion regarding the potential of either a public nuisance or repeated Police response to result from Valley Farms’ operation of a cannabis dispensary at 2033 North Main Street.

Selection Committee’s Determination and Findings
As outlined in section 5-07.09(a)(2), the Selection Committee is required to review the proposed new location and may approve an amendment to the new location if it can establish the following findings:
433
Page | 6
a. The new site would not be located within the distances specified in section 5-07.27, unless an exception is approved pursuant to that section;
b. The relocation to the new site would not create any significant negative impacts greater than those that existed at the original site;
c. The proposed location is located in an appropriate zoning district for the proposed use; and d. Owners of real property located within three hundred feet of the proposed site have been notified and have had an opportunity to provide information to the City regarding the proposed site.

On April 13, 2026, the Selection Committee met to consider the Amendment Application and at that meeting denied the Amendment Application pursuant to Municipal Code Section 5-

07.27(a)(1) because the site is located 995 feet from the Santa Rita School, at 2014 Santa Rita Street, which is less than the minimum required 1,000 feet for a sensitive use (see attached Denial Letter). During that meeting, the Selection Committee conveyed their reasons for the denial and the findings of fact upon which their decision was based to the City Attorney.

Appeal of Selection Committee denial:

Pursuant to Municipal Code Section 5-07.27(c), an application (including a dispensary application) which has been denied based on any of the limitations set forth in Subsections 5-

07.27(a)(3) through (a)(7) may be appealed by the applicant in accordance with Section 5-07.10.

The appellate body may grant an exception to the limitations set forth in this subsection upon findings that the intent of this article would otherwise be met. No such exception will be granted, however, for the distance limitations from those uses listed in Subsections (a)(1) and (a)(2). The Amendment Application was denied by the Selection Committee based on Subsection (a)(1) because the site is within 1,000 feet of a school.

Pursuant to Municipal Code Section 5-07.10, on April 21, 2026, the Applicant filed a timely appeal of the Selection Committee denial per the attached Appeal Letter (see Appeal Letter of the Selection Committee denial dated April 21, 2026). As per the Appeal Letter, the basis for appeal is as follows (staff response in italics):

1. Municipal Code does not specify whether the 1,000-foot distance is measured from parcelto-parcel, building-to-building, or by another method.

Staff Response: Per Municipal Code Section 5-07.27(i), for purposes of Section 5-07.27, distance shall be measured from the closest point of the site occupied by the Commercial Cannabis Business and the closest point of the site occupied by the use defined in Section 5-07.27 Subsection (a), including any parking areas, landscaping, and/or fencing, but excluding any areas of a parcel that is unavailable for use by the commercial cannabis business or the sensitive use. This section shall be construed to require measurement from parcel line to parcel line unless the Selection Committee determines that different points of measure would be appropriate.
434
Page | 7

2. That the State of California pursuant to Business and Professions Code 26054(b) establishes a Statewide minimum of a 600-foot radius between a licensed cannabis retail premises and a school providing instruction in Kindergarten or Grades 1 through 12 and directs that the distance shall be measured in a manner set forth in Health and Safety Code 11362.768(c).

Staff Response: Business and Professions Code 26054(b) states the following: “A premises licensed under this division shall not be located within a 600-foot radius of a school providing instruction in kindergarten or any grades 1 through 12, daycare center, or youth center that is in existence at the time the license is issued, unless the department or a local jurisdiction specifies a different radius. The distance specified in this section shall be measured in the same manner as provided in subdivision (c) of Section 11362.768 of the Health and Safety Code unless otherwise provided by law.” Per Municipal Code Section 5-07.27(a), the City of Salinas as a local jurisdiction has specified a 1,000-foot radius from a school for approval of Commercial Cannabis Businesses. The City’s 1,000-foot radius requirement exceeds the State’s 600-foot radius.

3. The City of Salinas failed to raise a zoning issue in a timely manner and was identified in November 2025 well into the review process.

Staff Response: Three (3) Zoning Information Letters were issued for the subject property (2033 North Main Street – APN: 253-061-025-000) on December 14, 2022, April 12, 2024, and December 15, 2025 (see attached). All three letters indicated the presence of sensitive uses including Santa Rita School at 2014 Santa Rita Street. In as early as 2022, a total of seven (7) sensitive uses were identified, including the school. Subsequently, additional sensitive alcohol related uses were also identified. It is noted that the State of California prohibits a cannabis dispensary located within 600 feet of a school; however, the Salinas Municipal Code requires a 1,000-foot separation. The Zoning Information Letters included two methodologies of measurements: one measured parcel to parcel, and the other by building to building, both of which were determined using the City’s GIS system.

See discussion below for measurement methodology pursuant to the Municipal Code.

4. That the denial rests on a five (5) foot shortfall, whereas an alternative and previously acknowledged measurement method, building-to-building, which is approximately 1,360 feet.

Staff Response: Per Municipal Code Section 5-07.27(i), measurement of a proposed Commercial Cannabis Business to a Sensitive Use is as follows:

For purposes of this section, distance shall be measured from the closest point of the site occupied by the commercial cannabis business and the closest point of the site occupied by the use defined in subsection (a), including any parking areas, landscaping, and/or fencing, but excluding any areas of a parcel that is unavailable for use by the commercial 435
Page | 8
cannabis business or the sensitive use. This section shall be construed to require measurement from parcel line to parcel line unless the Selection Committee determines that different points of measure would be appropriate.

Therefore, measurement is from parcel line to parcel line unless the Selection Committee determines that different points of measure would be appropriate. In this case, the Selection Committee did not determine a different point of measure. Staff notes that as of the date of the most recent Zoning Information Letter, the proposed Commercial Cannabis Business is located within 1,000 feet of nine (9) other sensitive uses consisting of several alcohol related uses and a smoke shop.

Planning Commission Consideration:

In response to the Applicant’s timely appeal of the Selection Committee’s denial of the Amendment Application, this item was scheduled for Planning Commission consideration at a public hearing on June 3, 2026. After hearing public testimony from both the Applicant and the public concerning the proposed Amendment Application, the Planning Commission by a 4-1 vote upheld the Selection Committee’s denial of Commercial Cannabis Permit 2025-004 (see Planning Commission Resolution 2025-04, Planning Commission Minutes dated June 3, 2026, and Planning Commission Staff Report dated June 3, 2026).

Appeal of Planning Commission upholding Selection Committee denial:

Pursuant to Municipal Code Section 5-07.27(c), an application (including a dispensary application) which has been denied based on any of the limitations set forth in Subsections 5-

07.27(a)(3) through (a)(7) may be appealed by the applicant in accordance with Section 5-07.10.

In addition, pursuant to Section 5-07.10(d), the decision of the Planning Commission may be appealed to the City Council in the same manner as an appeal to the Planning Commission, except that the hearing shall be set by the City Manager or his/her designee.

Pursuant to Municipal Code Section 5-07.10, on June 9, 2026, the Applicant filed a timely appeal of the Planning Commission’s upholding of the Selection Committee’s denial of the Amendment Application to the City Council as per the attached Appeal Letter (see Appeal Letter of the Planning Commission denial dated June 9, 2026). Per the Appeal Letter, the basis for appeal is summarized in the following (staff response in italics):

Factual and Procedural Background:

1. Valley Farms acquired an existing City-permitted dispensary in good-faith reliance on City determinations. In the appeal, the Applicant provided the following timeline. Per the Applicant, in 2020, they purchased the existing above referenced cannabis operation located at 1610 Moffett Street from the prior owners for over $3,000,000 relying on Cityissued documentation indicating that the operation was compliant. 436
Page | 9
Staff Response: The location of the previous site at 1610 Moffett Street in the Industrial Business Park (IBP) Zoning District does not permit a retail dispensary unless accessory to an IBP zoning compliant use. The Valley Farms retail operations on Moffett Street were not Zoning compliant following abandonment of the primary manufacturing use. Valley Farms dispensary was originally approved on December 28, 2017, as CCP 2017-004 under the name Emerald Skyway LLC. The original permit was connected to two other permits: CCP 2017-003 for Cultivation and CCP 2017-002 for Manufacturing. With the manufacturing permit, the retail dispensary was considered accessory. According to City records, the other two permits were not initiated. Upon abandonment of the manufacturing permit, the retail dispensary was not permitted.

2. That the City of Salinas identified the site (2033 North Main Street) as the most feasible site and confirmed its compliance. Per the Applicant, in April 2023, the City’s cannabis consultant advised that of all of the locations that they had evaluated, the site at 2033 North Main Street was the most feasible.

Staff Response: Multiple Zoning Information Letters have been prepared. All of the letters indicate proximity to sensitive uses dated back to 2022. Zoning Information Letter 2022- 011 (ZLTR 2022-011) dated December 14, 2022, which was referenced in the appeal letter stated that the proposed Commercial Cannabis Business (CCB) is located within 600-feet and 1,000-feet of sensitive uses as measured from parcel to parcel. The letter states that the site is located within 600-feet and 1,000-feet from five (5) sensitive uses as measured from building to building. As stated on Page 2 of the letter, the issuance of a “Zoning Information Letter” does not mean the written evidence of permission is given by the City or any of its officials to operate a CCB. Per Municipal Code Section 5.07.07(e), the Selection Committee shall have the authority to grant or deny an application for a commercial cannabis permit. The approval of a CCB is a discretionary action of the Selection Committee that may be appealed to the Planning Commission or the City Council.

3. The City of Salinas reversed course mid-process, applying a new measurement that produced a five-foot conflict.

Staff Response: Three (3) Zoning Information Letters were issued for the subject property (2033 North Main Street – APN: 253-061-025-000) on December 14, 2022, April 12, 2024, and December 15, 2025 (see attached). All three letters indicate the presence of sensitive uses including Santa Rita School at 2014 Santa Rita Street. In as early as 2022, a total of seven (7) sensitive uses were identified, including the school. Subsequently, additional sensitive alcohol related uses were identified. It is noted that the State of California prohibits a cannabis dispensary located within 600 feet of a school; however, the Salinas Municipal Code requires a 1,000-foot separation. The Zoning Information Letters included two methodologies of measurement: one measured parcel to parcel, and the other by building to building, both of which were determined using the City’s GIS system. See below for discussion on measurement methodology pursuant to the Municipal Code. 437
Page | 10
Argument:

4. That the denial turns on a single disputed five-foot shortfall based on an inappropriate and improper measurement methodology.

Staff Response: Per Municipal Code Section 5-07.27(i), measurement of a proposed Commercial Cannabis Business to a Sensitive Use is as follows:

For purposes of this section, distance shall be measured from the closest point of the site occupied by the commercial cannabis business and the closest point of the site occupied by the use defined in subsection (a), including any parking areas, landscaping, and/or fencing, but excluding any areas of a parcel that is unavailable for use by the commercial cannabis business or the sensitive use. This section shall be construed to require measurement from parcel line to parcel line unless the Selection Committee determines that different points of measure would be appropriate.

Therefore, measurement is from parcel line to parcel line unless the Selection Committee determines that different points of measure would be appropriate. In this case, the Selection Committee did not determine a different point of measure. Staff notes that as of the date of the most recent Zoning Information Letter, the proposed Commercial Cannabis Business is located within 1,000 feet of eight (8) other sensitive uses consisting of several alcohol related uses and a smoke shop. In addition, the proposed Commercial Cannabis Business is located adjacent to residential uses. The Zoning Information letters are prepared in a manner providing both measurement methodologies, subject to Selection Committee determination.

5. Properly measured under Municipal Code Section 5-07.27(i), the site satisfies the 1,000- foot separation.

Staff Response: Per Municipal Code Section 5-07.27(i), distance shall be measured from the closest point of the site occupied by the commercial cannabis business and the closest point of the site occupied by the use defined in subsection (a), including any parking areas, landscaping, and/or fencing, but excluding any areas of a parcel that is unavailable for use by the commercial cannabis business or the sensitive use. This section shall be construed to require measurement from parcel line to parcel line unless the Selection Committee determines that different points of measure would be appropriate. The Selection Committee did not determine whether an alternative point of measure would be appropriate.

6. The Code does not prescribe a single mandatory measurement methodology, and the City has applied it inconsistently.

Staff Response: Per Municipal Code Section 5-07.27(i), for purposes of Section 5-07.27, 438
Page | 11
distance shall be measured from the closest point of the site occupied by the Commercial Cannabis Business and the closest point of the site occupied by the use defined in Section 5-07.27 Subsection (a), including any parking areas, landscaping, and/or fencing, but excluding any areas of a parcel that is unavailable for use by the commercial cannabis business or the sensitive use. This section shall be construed to require measurement from parcel line to parcel line unless the Selection Committee determines that different points of measure would be appropriate.

7. State law measures that distance parcel line to parcel line without regard to intervening structures, and the site satisfies the state standard with substantial margin.

Staff Response: Business and Professions Code 26054(b) states the following: “A premises licensed under this division shall not be located within a 600-foot radius of a school providing instruction in kindergarten or any grades 1 through 12, daycare center, or youth center that is in existence at the time the license is issued, unless the department or a local jurisdiction specifies a different radius. The distance specified in this section shall be measured in the same manner as provided in subdivision (c) of Section 11362.768 of the Health and Safety Code unless otherwise provided by law.” Per Municipal Code Section 5-07.27(a), the City of Salinas as a local jurisdiction has specified a 1,000-foot radius from a school for approval of Commercial Cannabis Businesses. The City’s 1,000-foot radius requirement exceeds the State’s 600-foot radius.

On July 13, 2026, the Applicant e-mailed to City staff the attached Site Survey & Parcel separation for Emerald Skyway LLC prepared by Salinas Valley Surveyors dated July 10, 2026. The survey shows the minimum distance as 1,112.7 feet between the Santa Rita Elementary School District Property and the northwest corner of the Denny’s Restaurant Lease, on the boundary of Northridge Plaza Salinas of the subject property (APN: 253- 111-016-000). However, as stated above, the Municipal Code states that the minimum distance shall be measured from parcel-to-parcel, which is 995-feet (see attached measurements).

8. Valley Farms’ substantial good-faith reliance and the absence of any negative impact support reversal or, at minimum, an exception.

Staff Response: Each of the Zoning Information Letters that were provided to the Applicant stated that the issuance of a Zoning Information Letter does not mean the written evidence of permission given by the City of Salinas or any of its officials to operate a Commercial Cannabis Business (CCB) nor does it mean “permit” within the meaning of the Permit Streamlining Act, nor does it constitute an entitlement under the Zoning or Building Codes, and a regulatory permit for the purpose of regulating a CCB does not constitute a permit that runs with the land on which the CCB is established. Per Municipal Code Section 5-

07.07(e), the Selection Committee shall have the authority to either grant or deny an application for a commercial cannabis permit. Notwithstanding what is otherwise provided in this article, the Selection Committee, when approving a commercial cannabis permit, 439
Page | 12
may place any additional limitations and conditions on the operation of the business as deemed necessary, consistent with the public interest and with this article.

9. The City Council possesses the authority to grant an exception, and the equities and record warrant doing so here.

Staff Response: Per Municipal Code Section 5-07.07(g), in addition to whatever additional findings may be made by the Selection Committee (or the appellate body or the City Council in the event of an appeal initiated pursuant to this article), an application for a commercial cannabis permit may be denied upon making any of the following findings:
(1) The applicant made one or more false or misleading statements or omissions on the registration application or during the application process. (2) The applicant is not qualified to operate a commercial cannabis business. (3) The applicant fails to meet the requirements of this Article or any regulation adopted pursuant to this article.
(4) The operation of the proposed commercial cannabis business at the proposed location is prohibited by any state or local law or regulation. (5) Any person who is listed on the application is ineligible to operate a commercial cannabis business due to their criminal history as specified in subsection (b) of this Section.
(6) The applicant or the operator listed in the application is less than twenty-one years of age.
(7) The Selection Committee determines that the proposal, taken as a whole, would be unable to operate without significant impact on the community. (8) The number of businesses of the subject application type that have been approved or permitted within the City of Salinas meets or exceeds the maximum number of that respective business type specified in this article.

Public Correspondence:

Owners of real property located within 300-feet of the proposed site have been notified of this appeal and public hearing and have the opportunity to provide information to the City regarding the proposed site. The Appeal letter and other correspondence received up to the date of publication are attached to the Report. Any comments received after publication will be provided to the City Council at the meeting and will be included in the record.

Findings:

The City Council must establish findings to uphold the Planning Commission’s upholding of the Selection Committee denial of the Amendment Application. Findings for the City Council to consider, pursuant to City Code Section 5-07.09(a)(2), include the following (see attached draft denial resolution):
440
Page | 13
a. The new site would not be located within the sensitive use distances specified in Section 5-07.27, unless an exception is approved pursuant to that Section; b. The relocation of the new site would not create any significant negative impacts greater than those that existed at the original site;
c. The proposed location is located in an appropriate Zoning District for the proposed use; and
d. Owners of real property located within three hundred feet of the proposed site have been notified and have had the opportunity to provide information to the city regarding the proposed site.

Time Consideration:

The Planning Commission upheld the Selection Committee’s denial of the Amendment Application on June 3, 2026. On June 9, 2026, pursuant to Municipal Code Section 5-07.10, the Applicant filed a timely appeal within 10 calendar days of the Selection Committee denial.

Pursuant to Municipal Code Section 5-07.10(b), a public hearing before the City Council shall be scheduled within 60-days from the filing of the appeal. Per the Municipal Code, the deadline for City Council consideration is August 8, 2026.

CEQA CONSIDERATION:

Not a Project. The City of Salinas has determined that the proposed action is not a project as defined by the California Environmental Quality Act (CEQA) (CEQA Guidelines Section 15378).

CEQA Guidelines Section 15061 includes the general rule that CEQA applies only to activities which have the potential for causing a significant effect on the environment. Where it can be seen with certainty that there is no possibility that the activity in question may have a significant effect on the environment, the activity is not subject to CEQA. Because the proposed action and this matter have no potential to cause any effect on the environment, or because it falls within a category of activities excluded as projects pursuant to CEQA Guidelines Section 15378, this matter is not a project. Because the matter does not cause a direct or foreseeable indirect physical change on or in the environment, this matter is not a project. Any subsequent discretionary projects resulting from this action will be assessed for CEQA applicability.

Alternatives Available to the City Council (Section 5-07.10(d)):

1. Affirm the Planning Commission’s upholding of the Selection Committee’s denial of Valley Farm’s Amendment Application and deny Commercial Cannabis Permit 2025-004;

2. Reverse the Planning Commission’s upholding of the Selection Committee’s denial of Valley Farm’s Amendment Application and approve Commercial Cannabis Permit 2025- 004; or

3. Modify the Planning Commission’s upholding of the Selection Committee’s denial of Valley Farm’s Amendment Application and approve Commercial Cannabis Permit 2025- 441
Page | 14
004 with modifications.

CALIFORNIA GOVERNMENT CODE §84308 APPLIES:

No.

STRATEGIC PLAN INITIATIVE:

The appeal does not directly relate to the City Council’s 2025-2028 Strategic Goals.

DEPARTMENTAL COORDINATION:

The processing of this appeal appeals was been coordinated by the Current Planning Division of the Community Development Department, the City Attorney, and the Police Department.

FISCAL AND SUSTAINABILITY IMPACT:

No significant impacts to the City’s General Fund are anticipated with this application.

ATTACHMENTS:

Draft City Council Denial Resolution
Planning Commission Resolution 2026-05
Unofficial Planning Commission Minutes dated June 3, 2026 Planning Commission Staff Report dated June 3, 2026 without attachments Police Department Memorandum dated March 16, 2026
City Attorney Complete Letter dated March 13, 2026
Valley Farms Appeal Letter of Planning Commission denial dated June 9, 2026 Site Survey & Parcel Separation for Emerald Skyway LLC prepared by Salinas Valley Surveyors dated July 10, 2026
Valley Farms Appeal Letter of Selection Committee denial dated April 21, 2026 City Attorney Denial Letter dated April 13, 2026
Parcel to Parcel distance map
Sensitive Uses Map for CCP 2025-004
Sensitive Uses Radius Map within 1,000 feet of 2033 North Main Street CCP 2023-006 Valley Farms Renewal
Zoning Information Letter 2025-007 dated December 15, 2025 Zoning Information Letter 2024-010 dated June 11, 2024
Zoning Information Letter 2024-006 dated May 9, 2024
Zoning Information Letter 2023-002 dated April 26, 2023 Zoning Information Letter 2022-011 dated December 14, 2022 Ordinance No. 2566 (N.C.S.) and Report to the City Council Ordinance No. 2597 (N.C.S.) and Report to the City Council Ordinance No. 2598 (N.C.S.) and Report to the City Council 442
Page | 15
Ordinance No. 2600 (N.C.S.) and Report to the City Council Draft August 4, 2026 City Council PowerPoint presentation Cc: Emerald Skyway LLC (doing business as “Valley Farms”), Applicant and Appellant Micalah Frey, Kolaboration Ventures Corporation
Chuck Wesley, Kolaboration Ventures Corporation
Andrew Wesley, Kolaboration Ventures Corporation
Martin Wesley, Kolaboration Ventures Corporation
Gene Stonebarger, Stonebarger Law
Krista Fontius, Kolaboration Ventures Corporation
Northridge Plaza, LLC, Property Owner
I:\ComDev\Planning Share Space\Cannabis Permits\CCP 2025-004 Emerald Skyway-Valley Farms\08-04-26 CC Staff Report.docx 443
RESOLUTION NO. ____________ (N.C.S.)

A RESOLUTION OF THE CITY OF SALINAS CITY COUNCIL UPHOLDING

APPEAL OF PLANNING COMMISSION DENIAL OF SELECTION COMMITTEE DENIAL OF COMMERCIAL CANNABIS PERMIT 2025-004 TO AMEND
COMMERCIAL CANNABIS PERMIT 2024-009 TO RELOCATE FROM 1610 MOFFETT STREET TO 2033 NORTH MAIN STREET IN THE COMMERCIAL RETAIL – WEST BORONDA ROAD AT U.S. 101 GATEWAY OVERLAY (CR–GW-1)

ZONING DISTRICT
(CCP 2025-004)
WHEREAS, on November 21, 2025, the Applicant, Emerald Skyway LLC (doing business as “Valley Farms”) applied for a Major Amendment to Commercial Cannabis Permit 2024-009, known as Commercial Cannabis Permit 2025-004 (CCP 2025-004), to relocate an existing Cannabis Dispensary with accessory Delivery and Distribution from 1610 Moffett Street to 2033 North Main Street (Assessor's Parcel Number: 253-061-025-000); and WHEREAS, on April 13, 2026, the Selection Committee denied Commercial Cannabis Permit 2025-004 due to the proposed location (2033 North Main Street) being within one thousand (1,000) feet of a school (Santa Rita Elementary School - 2014 Santa Rita Street, Salinas), measured parcel to parcel; and
WHEREAS, on April 21, 2026, the Applicant, pursuant to Municipal Code Section 5-

07.10, submitted a timely appeal of the Selection Committee’s April 13, 2026 denial to the Planning Commission; and
WHEREAS, on June 3, 2026, the Salinas Planning Commission, at the request of the Applicant, held a duly noticed public hearing to consider the appeal of the Selection Committee’s April 13, 2026 denial of Commercial Cannabis Permit 2025-004; and WHEREAS, at the June 3, 2026, public hearing, the Salinas Planning Commission considered the Amendment Application, staff reports (both oral and written), the General Plan and Zoning on the subject property, the Zoning Code codified at Chapter 37 and Public Peace and Morals (Cannabis) codified at Chapter 5 of the Salinas Municipal Code, testimony, written comments, and all other materials presented at the public hearing and upheld the Selection Committee’s denial of Commercial Cannabis Permit 2025-004 pursuant to Planning Commission Resolution 2026-05; and
WHEREAS, on June 9, 2026, the Applicant appealed the Planning Commission’s upholding of the Selection Committee’s denial of Commercial Cannabis Permit 2025-004; and WHEREAS, the City Council held a duly noticed public hearing on August 4, 2026, and considered the Staff Report, meeting minutes, Planning Commission Resolution, Selection Committee denial, public testimony, and correspondence regarding Commercial Cannabis Permit 2025-004 (CCP 2025-004).
444
NOW, THEREFORE, BE IT RESOLVED by the Salinas City Council that it upholds the Planning Commission’s June 3, 2026 upholding of the Selection Committee’s April 13, 2026 denial and denies Commercial Cannabis Permit 2025-004; and BE IT FURTHER RESOLVED that the Salinas City Council adopts the following findings as the basis for its determination, and that the foregoing recitations are true and correct, and are included herein by reference as findings:

1. The City of Salinas has determined that the proposed action is not a project as defined by the California Environmental Quality Act (CEQA) (CEQA Guidelines Section 15378). In addition, CEQA Guidelines Section 15061 includes the general rule that CEQA applies only to activities which have the potential for causing a significant effect on the environment. Where it can be seen with certainty that there is no possibility that the activity in question may have a significant effect on the environment, the activity is not subject to CEQA. Because the proposed action and this matter have no potential to cause any effect on the environment, or because it falls within a category of activities excluded as projects pursuant to CEQA Guidelines Section 15378, this matter is not a project. Because the matter does not cause a direct or foreseeable indirect physical change on or in the environment, this matter is not a project. Any subsequent discretionary projects resulting from this action will be assessed for CEQA applicability.

For the Commercial Cannabis Permit (Dispensary):

2. Pursuant to City Code Section 5-07.09(a)(2), the City Council determines the following:
a. The new site is located within the sensitive distances specified in City Code Section 5-07.27, and no exception has been approved pursuant to this Section; Pursuant to State Law, the proposed site must not be located within a 600-foot radius of a day care, preschool, private/charter school or school. In addition, pursuant to Municipal Code Section 5-07.27(a), no Commercial Cannabis Business may operate within 1,000 feet of any of the following sensitive uses:
(1) School, college or university (including public, private, charter, and other non-traditional schools, but excluding trade schools that exclusively serve adults at least eighteen years of age); (2) Park, daycare center, library, or publicly-owned and operated recreational facility;
(3) Church or other house of worship;
(4) Smoke-shops, hookah lounges or businesses engaged in the same or a similar activity, and locations where alcohol is sold or served for individual consumption on or off the premises;
445
(5) Card rooms and retail firearm sales businesses;
(6) Any other commercial cannabis business operating as a dispensary, excepting therefrom the occasional and transient operation of a commercial cannabis delivery business, or
(7) Any other public or private business or facility where the presence of the commercial cannabis activity would cause a public nuisance or other situation which may result in repeated police department response.

No exception has been approved by the City Council. The new site is located within 1,000 feet of sensitive uses pursuant to Municipal Code Section 5-07.27(a).

Pursuant to Municipal Code Section 5-07.27(a)(1), the site is located within 1,000 feet of a school (Santa Rita School, at 2014 Santa Rita Street). Pursuant to Municipal Code Section 5-07.27(a)(4), the site is also located within 1,000 feet of locations of where alcohol is sold for individual consumption on or off the premises, and a smoke shop. See Table 1 below:

Table 1: Distance to Sensitive Uses
Address Use Distance
Parcel to Parcel
Business Name

1. 2014 Santa Rita
Street
School 995 feet away

Santa Rita
Elementary
School

2. 2015 N. Main
Street
On-site
alcohol sales
Same parcel El Michoacano
Restaurant

3. 2010 N. Main
Street
Off-site
alcohol sales
105 feet away

Fish & Chips

4. 2087 N. Main
Street
Off-site
alcohol sales
505 feet away

La Consentida
Market

5. 1988 N. Main
Street
On-site
alcohol sales
242 feet away

Buffalo Wild
Wings

6. 2068 N. Main
Street
Off-site
alcohol sales
560 feet away 7-Eleven

7. 1962 N. Main
Street
Off-site
alcohol sales
242 feet away

Foodmaxx

8. 1912 N. Main
Street
Smoke Shop 242 feet away

Santa Rita Smoke
Shop

9. 2034 N. Main
Street
Off-site
alcohol sales
110 feet away

Tony’s market

10. 95 Castro Street Residential Adjacent

93 North
Apartments
Per Municipal Code Section 5-07.27(d), no commercial cannabis business may 446
operate within any residential area or district of the city or adjacent to a residential area or district if, in the opinion of the Chief of Police or the Community Development Director, the operation of a commercial cannabis business in such location would tend to cause a public nuisance or a situation which may result in repeated police department response or a negative impact on the adjacent residential units. Staff notes there is an existing multi-family residential development located at 95 Castro Street (93 North Apartments) adjacent to the north of the site.

Per a Police Department Memorandum dated March 16, 2026, the Police Chief is not aware of any information or conditions sufficient to form an opinion regarding the potential of either a public nuisance or repeated Police response to result from Valley Farms’ operation of a cannabis dispensary at 2033 North Main Street. b. The relocation of the new site would create significant negative impacts greater than those existing at the original site;
The new site is located within 1,000 feet of sensitive uses pursuant to Municipal Code Section 5-07.27(a). Pursuant to Municipal Code Section 5-07.27(a)(1), the site is located within 1,000 feet of a school (Santa Rita School, at 2014 Santa Rita Street). In addition, pursuant to Municipal Code Section 5-07.27(a)(4), the new site is also located within 1,000 feet of locations of where alcohol is sold for individual consumption on or off the premises, and a smoke shop. Because the site is located within an area of sensitive uses pursuant to Municipal Code Section 5-

07.27(a), the relocation would create significant negative impacts greater than those existing at the original site of 1610 Moffett Street.
c. The new site is located in an appropriate Zoning District for the proposed use; and
The proposed Cannabis Dispensary with accessory Delivery and Distribution is considered a retail use, which is permitted in the Commercial Retail – West Boronda Road at U.S. 101 Gateway Overlay (CR–GW-1) Zoning District. d. Owners of real property located within 300-feet of the new site have been notified and have had the opportunity to provide information to the City regarding the proposed site.

City staff mailed public hearing notices to all property owners within 300-feet of the new site and interested parties and July 17, 2026 and posted notices on July 20, 2026. The public hearing notice was published in the Monterey County Weekly on July 23, 2026.
447
PASSED AND APPROVED this 4th day of August 2026 by the following vote:

AYES:

NOES:

ABSTAIN:

ABSENT:

APPROVED
_________________________________
Dennis Donohue, Mayor
ATTEST
________________________
Patricia Soratos, City Clerk
I:\ComDev\Planning Share Space\Cannabis Permits\CCP 2025-004 Emerald Skyway-Valley Farms\08-04-26 CC Denial Resolution.docx 448
449
450
451
200 Lincoln Ave., Salinas,
CA 93901
www.salinas.gov
City of Salinas
Meeting Minutes - Unofficial
Planning Commission
Commissioners:

Juan Gutierrez, Mayor's Appointee
Eric Mora, District 1 - Juan Flores, District 2
Lorisa McKelvey Daye, District 3 - Maureen Wruck, District 4 Carissa Purnell, District 5 - Marcelino Rocamora Jr, District 6 Lisa Brinton, Community Development Director
Courtney Grossman, Planning Manager
Christopher A. Callihan, City Attorney
Community Development Department Office: (831) 758-7206 Wednesday, June 3, 2026 4:00 PM City Council Rotunda

PLEDGE OF ALLEGIANCE

ROLL CALL
Commissioner Lorisa McKelvey Daye
Commissioner Carissa Purnell
Commissioner Marcelino Rocamora Jr
Commissioner Maureen Wruck
Commissioner Juan Gutierrez
Commissioner Juan Flores

Present: 6 -

Absent: 1 - Commissioner Eric Mora

GENERAL PUBLIC COMMENTS

CONSENT
ID#26-261 Minutes of May 20, 2026.

Upon motion by Commissioner Purnell, seconded by Commissioner Wruck, the Minutes of May 20, 2026, were approved. The motion carried by the following vote:

Ayes: Commissioner McKelvey Daye, Commissioner Purnell, Commissioner Rocamora Jr, Commissioner Wruck, Commissioner Gutierrez and Commissioner Flores 6 -

Absent: 1 - Commissioner Mora

PUBLIC HEARINGS
ID#26-262 Commercial Cannabis Permit 2025-004; Appeal of Selection Committee Denial of a Major Amendment to Commercial Cannabis Permit 2024-009 to Relocate from 1610 Moffett Street to 2033 North Main Street in the Commercial Retail - West Boronda Road at U.S. 101 Gateway Overlay City of Salinas Page 1
452
Planning Commission Meeting Minutes - Unofficial June 3, 2026 (CR-GW-1) Zoning District
Received a presentation from Senior Planner, Thomas Wiles. On November 21, 2025, the Applicant, Emerald Skyway LLC (doing business as “Valley Farms”), submitted Commercial Cannabis Permit 2025-004 for a major amendment (“Amendment Application”) to Commercial Cannabis Permit 2024-009 (“CCP 2024-009”) to relocate an existing Cannabis Dispensary with accessory Delivery and Distribution from 1610 Moffett Street to 2033 North Main Street. Following the City Attorney’s determination that the Amendment Application contained all the required information, the Amendment Application was forwarded to the Selection Committee appointed by the City Manager for their review in accordance with Article VII of Chapter 5 of the Salinas Municipal Code. On April 13, 2026, the Selection Committee met to consider the Amendment Application and at that meeting denied the Amendment Application. On April 21, 2026, pursuant to Municipal Code Section 5-07.10, Valley Farms submitted an appeal of the Selection Committee’s denial. Report filed with the Commission Secretary as the record.

The following members of the public commented on the item:
- Krista Fontius
- Martin Wesley
- Jacob Sandoval
- Felipe Lopez
- Jasmin Topete
- Unidentified Audience Member
- Wendy
- Mario
Upon motion by Commissioner Wruck, seconded by Commissioner Gutierrez, a motion to approve a resolution as follows: 1. Find the action is not a project as defined by the California Environmental Quality Act(CEQA) (CEQA Guidelines Section 15378) and exempt pursuant to CEQA Guidelines Section 15061 which includes the general rule that CEQA applies only to activities which have the potential for causing a significant effect on the environment; and 2. Affirm the Selection Committee’s denial of Emerald Skyway LLC’s (doing business as “Valley Farms”) request to amend Commercial Cannabis Permit 2024-009 (Commercial Cannabis Permit 2025-004) to relocate from 1610 Moffett Street to 2033 North Main Street within proximity of sensitive uses per Municipal Code Section 5-07.27, was approved. The motion carried by the following vote:

Ayes: Commissioner McKelvey Daye, Commissioner Purnell, Commissioner Wruck and Commissioner Gutierrez
4 -
Noes: 1 - Commissioner Flores

Absent: 1 - Commissioner Mora
Recused: 1 - Commissioner Rocamora Jr
ID#26-244 Time Extension 2026-003 (TE 2026-003); Request for 36-month Time Extension to Tentative Map 2022-001 located at the southeast corner of the John Street and Abbott Street intersection in the Commercial Office - Abbott Street Focused Growth Overlay (CO - FG-4) and Industrial - General (IG) Zoning District.

Received a presentation from Associate Planner, Bobby Latino, regarding the UniKool Partners, Applicant and Property Owner, requests a 36-month extension to Tentative Map City of Salinas Page 2
453
Planning Commission Meeting Minutes - Unofficial June 3, 2026 2022-001 to extend the expiration date from June 11, 2026 to June 11, 2029. Tentative Map 2022-001 was approved by City Council on June 11, 2024, which reconfigures fourteen (14) lots into nine (9) lotsin connection with a proposed mixed use development project. The time extension is requested to allow additional time to process civil drawings submitted for on- and off-site infrastructure improvements and a building application for the construction of the hotel which cannot be issued prior to Final map recordation. More time is also needed to undertake additional testing required for compliance with mitigations measures identified in the adopted Initial Study Mitigated Negative Declaration (ISMND) and Mitigation Monitoring and Reporting Program (MMRP). Pursuant to Municipal Code Section 31-401.11, extensions to approved tentative maps require a recommendation from the Planning Commission and final determination by the City Council. Report filed with the Commission Secretary as the record.

Upon motion by Commissioner Gutierrez, seconded by Commissioner Purnell, a motion to approve a resolution finding the project consistent with the Initial Study Mitigated Negative Declaration adopted by the City Council on June 11, 2024, affirming the findings, and recommending City Council approve a 36-month time extension to Tentative Map 2022-001, was approved. The motion carried by the following vote:

Ayes: Commissioner McKelvey Daye, Commissioner Purnell, Commissioner Rocamora Jr, Commissioner Wruck, Commissioner Gutierrez and Commissioner Flores 6 -

Absent: 1 - Commissioner Mora
ID#26-260 Zoning Code Amendment 2026-001; Phase 1 - An Ordinance Amending Chapters 17 (Housing) and 37 (Zoning Code) of the Salinas Municipal Code to Align with State Law Related to Housing and Cottage Food Operations, Federal Law Related to Religious Uses, Amend Requirements for Driveway Width Expansions, and Amend Requirements for Accessory Office Space in Industrial Districts
Item continued to the June 17, 2026, Planning Commission meeting.

CONSIDERATIONS

COMMISSIONER COMMENTS / REPORTS
Commissioner Wruck inquired about a residential zoning area and asked whether boarding houses are permitted within it.

FUTURE AGENDA ITEMS
Planning Manager, Courtney Grossman, introduced the tentative items for the upcoming meetings of June 17 and July 1, 2026.

ADJOURNMENT
Meeting adjourned at 5:01 P.M.
__________________________________
Brisa Salcedo / Administrative Aide
City of Salinas Page 3
454
Page | 1

CITY OF SALINAS

PLANNING COMMISSION REPORT
DATE: JUNE 3, 2026
TO: PLANNING COMMISSION
FROM: LISA BRINTON, COMMUNITY DEVELOPMENT DIRECTOR
THROUGH: COURTNEY GROSSMAN, PLANNING MANAGER
BY: THOMAS WILES, SENIOR PLANNER
TITLE: COMMERCIAL CANNABIS PERMIT 2025-004; APPEAL OF

SELECTION COMMITTEE DENIAL OF A MAJOR AMENDMENT TO
COMMERCIAL CANNABIS PERMIT 2024-009 TO RELOCATE FROM
1610 MOFFETT STREET TO 2033 NORTH MAIN STREET IN THE
COMMERCIAL RETAIL – WEST BORONDA ROAD AT U.S. 101
GATEWAY OVERLAY (CR–GW-1) ZONING DISTRICT
RECOMMENDED MOTION:

A motion to approve a resolution as follows:

1. Find the action is not a project as defined by the California Environmental Quality Act (CEQA) (CEQA Guidelines Section 15378) and exempt pursuant to CEQA Guidelines Section 15061 which includes the general rule that CEQA applies only to activities which have the potential for causing a significant effect on the environment; and

2. Affirm the Selection Committee’s denial of Emerald Skyway LLC’s (doing business as “Valley Farms”) request to amend Commercial Cannabis Permit 2024-009 (Commercial Cannabis Permit 2025-004) to relocate from 1610 Moffett Street to 2033 North Main Street within proximity of sensitive uses per Municipal Code Section 5-07.27.

EXECUTIVE SUMMARY:

On November 21, 2025, the Applicant, Emerald Skyway LLC (doing business as “Valley Farms”), submitted Commercial Cannabis Permit 2025-004 for a major amendment (“Amendment Application”) to Commercial Cannabis Permit 2024-009 (“CCP 2024-009”) to relocate an existing Cannabis Dispensary with accessory Delivery and Distribution from 1610 Moffett Street to 2033 455
Page | 2
North Main Street. Following the City Attorney’s determination that the Amendment Application contained all the required information, the Amendment Application was forwarded to the Selection Committee appointed by the City Manager for their review in accordance with Article VII of Chapter 5 of the Salinas Municipal Code. On April 13, 2026, the Selection Committee met to consider the Amendment Application and at that meeting denied the Amendment Application. On April 21, 2026, pursuant to Municipal Code Section 5-07.10, Valley Farms submitted an appeal of the Selection Committee’s denial (see attached Appeal Letter).

DISCUSSION:

Background:

The proposed site is owned by Northridge Plaza, LLC and is located at 2203 North Main Street [Assessor Parcel Number (APN): 253-061-025-000]. The commercial cannabis business would be located within an approximately 2,733 square-foot tenant space in the Northridge Plaza Shopping Center at the northwest corner of North Main Street and Boronda Road across Boronda Road from the Northridge Mall Shopping Center. The site consists of approximately 1.98-acres and is located in the Commercial Retail – West Boronda Road at U.S. 101 Gateway Overlay (CRGW-1) Zoning District. The following provides an overview of the land uses and zoning districts adjacent to the proposed site:

North: Multi-family Residential and Commercial/Residential High Density-West Boronda Road @ U.S. 101 (R-H-2.1-GW-1) and Commercial Retail (CR) South: Northridge Mall Shopping Center/Commercial Retail (CR) East: Multi-family Residential and Commercial/Residential High Density (R-H2.1) and Commercial Retail (CR) West: U.S. Highway 101
On January 26, 2016, the Salinas City Council adopted Ordinance No. 2566 allowing for the establishment, operation and regulation of commercial cannabis businesses for the dispensing, distribution, cultivation, and manufacturing of medical marijuana and medical marijuana products. (A copy of the City Council’s January 26, 2016, Report to the City Council and of Ordinance No. 2566 (N.C.S.) are attached to this report for reference. At the time of the City Council’s adoption of Ordinance No. 2566, one medical marijuana edible manufacturing and wholesale distribution facility had begun operating in the city prior to the City’s having established any land use controls or requirements for the operation of such businesses. Ordinance No. 2566 repealed a prohibition on the establishment and operation of medical marijuana cultivation facilities and manufacturing facilities, allowed for a limited number of commercial cannabis businesses to open and to operate, provided for a competitive process for the limited number of commercial cannabis permits, and imposed operating restrictions to protect the health, safety, and welfare of the general public.

Among the regulations included in Ordinance No. 2566 were restrictions on the proximity of commercial cannabis businesses to sensitive uses.
456
Page | 3
The Salinas City Council amended Ordinance No. 2566 (the City’s commercial cannabis business regulations) on three occasions in 2017:
a. Ordinance No. 2597 (N.C.S.) adopted on August 15, 2017, increased the maximum number of permits which may be issued in the dispensary, manufacturing, and cultivation categories; provided for an administrative process for cannabis testing facilities; and included administrative revisions to the City’s commercial cannabis regulations to reflect changes in state law and changes in the City’s implementation of the commercial cannabis business regulations. (A copy of Ordinance No. 2597 and the associated Report to the City Council are attached to this report for reference.)
b. Ordinance No. 2598 (N.C.S.) adopted on September 5, 2017, recodified several chapters and articles of the Salinas Municipal Code, including those related to the regulations on commercial cannabis businesses. No changes were made to the content of those provisions outlining the regulations on commercial cannabis businesses. (A copy of Ordinance No. 2598 (N.C.S.) and the associated Report to the City Council are attached to this report for reference.)
c. Ordinance No. 2600 (N.C.S.) adopted on November 29, 2017, updated the regulations on commercial cannabis businesses codified at Article VII of Chapter 5 of the Salinas Municipal Code. Specifically, Ordinance No. 2600 specified that businesses involving adult-use cannabis and cannabis products may operate within the city. Ordinance No. 2600 also clarified the City’s permitting structure for commercial cannabis businesses, clarified the operating requirements of various types of commercial cannabis businesses, established commercial cannabis businesses codified at Article VII of Chapter 5 of the Salinas Municipal Code. Specifically, Ordinance No. 2600 specified that businesses involving adult-use cannabis and cannabis products may operate within the city. Ordinance No. 2600 also clarified the City’s permitting structure for commercial cannabis businesses, clarified the operating requirements of various types of commercial cannabis businesses, established reasonable regulations relating to the growing of cannabis within a private residence for personal use, and included administrative changes to the regulations to reflect changes in state law and in the City’s implementation of the Salinas Municipal Code. A copy of Ordinance No. 2600 (N.C.S.) and the associated Staff Report to the City Council are attached to this report for reference.

Commercial Cannabis is regulated by the City’s Municipal Code Chapter 5 – Public Peace and Morals.

Commercial Cannabis Permits-Amendment Procedures
The holder of a Commercial Cannabis Permit (CCP) issued by the City may request an Amendment pursuant Municipal Code Section 5-07.09. Permittees may request relocation of their cannabis business by submitting a complete application for CCP amendment, including all items normally required for a new CCP application, excluding information relating to the principals or operations that will remain unchanged and are not directly related to the site. The application for 457
Page | 4
a change to the business location must submit all items normally required for a new application as outlined on section 5-07.07.

The Amendment Application is subject to compliance with Municipal Code Section 5-07.09(a).

The applicant may request a change to the business location subject to the following requirements:
(1) The applicant shall submit all items normally required for a new application, except that information related to the principals or operations that will remain unchanged and are not directly related to the site may be excluded. (2) The selection committee shall review the proposed new site. The selection committee may approve an amendment to the permit authorizing the new site if it can make the following findings:
a. The new site would not be located within the distances specified in Section 5-07.27, unless an exception is approved pursuant to that section. b. The relocation to the new site would not create any significant negative impacts greater than those that existed at the original site. c. The proposed location is located in an appropriate zoning district for the proposed use.
d. Owners of real property located within three hundred feet of the proposed site have been notified and have had the opportunity to provide information to the city regarding the proposed site.

Commercial Cannabis Permit 2025-004
Valley Farms has been in pursuit of relocation since 2022 as reflected in the record with the request for five (5) separate Zoning Information Letters as shown in the Table 1: Zoning Information Letters. All five Zoning Information Letters are attached to this staff report.

Table 1: Zoning Information Letters
Case Number Date of
Letter
Address Sensitive Uses

1. ZLTR 2022-011 12/14/22 2033 N Main Street 7; One school, five alcohol-related uses, and a smoke shop

2. ZLTR 2024-003 4/12/24 2033 N Main Street 9; One school, six alcohol-related uses, one smoke shop, and one site zoned for multi-family
residential uses

3. ZLTR 2024-006 5/9/24 61 Tarp Circle 6; One park and recreation facility, two religious assembly facilities, and three alcohol-related uses
458
Page | 5

4. ZLTR 2024-010 6/11/24 240 W Market Street 4; One religious assembly facility, one alcoholrelated use and two residential uses

5. ZLTR 2025-007 11/21/25 2033 N Main Street 10; One elementary school, seven alcohol-related uses, one smoke shop, and one site zoned for
multi-family residential uses
Analysis:

Pursuant to State Law, the proposed site must not be located within a 600-foot radius of a day care, preschool, private/charter school or school. In addition, pursuant to Municipal Code Section 5-

07.27(a), no Commercial Cannabis Business may operate within 1,000 feet of any of the following sensitive uses:
(1) School, college or university (including public, private, charter, and other nontraditional schools, but excluding trade schools that exclusively serve adults at least eighteen years of age);
(2) Park, daycare center, library, or publicly-owned and operated recreational facility; (3) Church or other house of worship;
(4) Smoke-shops, hookah lounges or businesses engaged in the same or a similar activity, and locations where alcohol is sold or served for individual consumption on or off the premises;
(5) Card rooms and retail firearm sales businesses;
(6) Any other commercial cannabis business operating as a dispensary, excepting therefrom the occasional and transient operation of a commercial cannabis delivery business, or
(7) Any other public or private business or facility where the presence of the commercial cannabis activity would cause a public nuisance or other situation which may result in repeated police department response.

The proposed location at 2033 North Main Street is within a 1,000-foot radius (measured from parcel to parcel) from the ten (10) identified sensitive uses listed Municipal Code Section 5-

07.27(a)(1) and (4) and shown on Table 2: Distance to Sensitive Uses below. 459
Page | 6
Table 2: Distance to Sensitive Uses
Address Use Distance
Parcel to Parcel Building to Building
Business Name

1. 2014 Santa Rita
Street
School 995 feet away 1,360 feet
away
Santa Rita
Elementary
School

2. 2015 N. Main Street On-site
alcohol sales
Same parcel 180 feet away ElMichoacano
Restaurant

3. 2010 N. Main Street Off-site
alcohol sales
105 feet away 450 feet
away
Fish & Chips

4. 2087 N. Main Street Off-site
alcohol sales
505 feet away 570 feet
away
La Consentida
Market

5. 1988 N. Main Street On-site
alcohol sales
242 feet away 660 feet
away
Buffalo Wild
Wings

6. 2068 N. Main Street Off-site
alcohol sales
560 feet away 590 feet
away
7-Eleven

7. 1962 N. Main Street Off-site
alcohol sales
242 feet away 950 feet
away
Foodmaxx

8. 1912 N. Main Street Smoke Shop 242 feet away 1,300 feet away
Santa Rita Smoke
Shop

9. 2034 N. Main Street Off-site
alcohol sales
110 feet away 334 feet
away
Tony’s market

10. 95 Castro Street Residential Adjacent 57 feet
away
93 North
Apartments
Police Department Comments:

Per Municipal Code Section 5-07.27(d), no commercial cannabis business may operate within any residential area or district of the city or adjacent to a residential area or district if, in the opinion of the chief of police or the community development director, the operation of a commercial cannabis business in such location would tend to cause a public nuisance or a situation which may result in repeated police department response or a negative impact on the adjacent residential units. Staff notes there is an existing 46-unit multi-family residential development located at 75 Nissen Drive adjacent to the site to the northwest.

Per the attached Memorandum dated March 16, 2026, the Police Chief is not aware of any information or conditions sufficient to form an opinion regarding the potential of either a public nuisance or repeated Police response to result from Valley Farms’ operation of a cannabis dispensary at 2033 North Main Street.

Selection Committee’s Determination and Findings
As outlined in section 5-07.09(a)(2), the Selection Committee is required to review the proposed 460
Page | 7
new location and may approve an amendment to the new location if it can make the following findings:
a. The new site would not be located within the distances specified in section 5-07.27, unless an exception is approved pursuant to that section;
b. The relocation to the new site would not create any significant negative impacts greater than those that existed at the original site;
c. The proposed location is located in an appropriate zoning district for the proposed use; and d. Owners of real property located within three hundred feet of the proposed site have been notified and have had an opportunity to provide information to the City regarding the proposed site.

On April 13, 2026, the Selection Committee met to consider the Amendment Application and at that meeting denied the Amendment Application pursuant to Municipal Code Section 5-

07.27(a)(1) because the site is located 995 feet from the Santa Rita School, at 2014 Santa Rita Street, which is less than the minimum required 1,000 feet for a sensitive use (see attached Denial Letter). During that meeting, the Selection Committee conveyed their reasons for the denial and the findings of fact upon which their decision was based to the City Attorney.

Appeal of Selection Committee denial:

Pursuant to Municipal Code Section 5-07.27(c), an application (including a dispensary application) which has been denied based on any of the limitations set forth in Subsections 5-

07.27(a)(3) through (a)(7) may be appealed by the applicant in accordance with Section 5-07.10.

The appellate body may grant an exception to the limitations set forth in this subsection upon findings that the intent of this article would otherwise be met. No such exception will be granted, however, for the distance limitations from those uses listed in Subsections (a)(1) and (a)(2). The Amendment Application was denied based on Subsection (a)(1) because the site is within 1,000 feet of a school.

Pursuant to Municipal Code Section 5-07.10, on April 21, 2026, the Applicant filed a timely appeal of the Selection Committee denial per the attached Appeal Letter (see Appeal Letter). As per the Appeal Letter, the basis for appeal is as follows (staff response in italics):

1. Municipal Code does not specify whether the 1,000 foot distance is measured from parcelto-parcel, building-to-building, or by another method.

Staff Response: Per Municipal Code Section 5-07.27(i), for purposes of Section 5-07.27, distance shall be measured from the closest point of the site occupied by the Commercial Cannabis Business and the closest point of the site occupied by the use defined in Section 5-07.27 Subsection (a), including any parking areas, landscaping, and/or fencing, but excluding any areas of a parcel that is unavailable for use by the commercial cannabis business or the sensitive use. This section shall be construed to require measurement from parcel line to parcel line unless the selection committee determines that different 461
Page | 8
points of measure would be appropriate.

2. That the State of California pursuant to Business and Professions Code 26054(b) establishes a Statewide minimum of a 600-foot radius between a licensed cannabis retail premises and a school providing instruction in Kindergarten or Grades 1 through 12 and directs that the distance shall be measured in a manner set forth in Health and Safety Code 11362.768(c).

Staff Response: Business and Professions Code 26054(b) states the following: “A premises licensed under this division shall not be located within a 600-foot radius of a school providing instruction in kindergarten or any grades 1 through 12, daycare center, or youth center that is in existence at the time the license is issued, unless the department or a local jurisdiction specifies a different radius. The distance specified in this section shall be measured in the same manner as provided in subdivision (c) of Section 11362.768 of the Health and Safety Code unless otherwise provided by law.” Per Municipal Code Section 5-07.27(a), the City of Salinas as a local jurisdiction has specified a 1,000-foot radius from a school for approval of Commercial Cannabis Businesses. The City’s 1,000-foot radius requirement exceeds the State’s 600-foot radius.

3. The City of Salinas failed to raise a zoning issue in a timely manner and was identified in November 2025 well into the review process.

Staff Response: Three (3) Zoning Information Letters were issued for the subject property (2033 North Main Street – APN: 253-061-025-000) on December 14, 2022, April 12, 2024, and December 15, 2025 (see attached). All three letters indicated the presence of sensitive uses including the Santa Rita School at 2014 Santa Rita Street. In as early as 2022, a total of seven (7) sensitive uses were identified, including the school. Subsequently, additional sensitive alcohol related uses were also identified. It is noted that the State of California prohibits a cannabis dispensary located within 600 feet of a school; however, the Salinas Municipal Code requires a 1,000 foot separation. The Zoning Information Letters included two methodologies of measurements: one measured parcel to parcel, and the other by building to building, both of which determined by the City’s GIS system. See discussion below for measurement methodology pursuant to the Municipal Code.

4. That the denial rests on a five (5) foot shortfall, whereas an alternative and previously acknowledged measurement method, building-to-building, which is approximately 1,360 feet.

Staff Response: Per Municipal Code Section 5-07.27(i), measurement of a proposed Commercial Cannabis Business to a Sensitive Use is as follows:

For purposes of this section, distance shall be measured from the closest point of the site occupied by the commercial cannabis business and the closest point of the site occupied by the use defined in subsection (a), including any parking areas, 462
Page | 9
landscaping, and/or fencing, but excluding any areas of a parcel that is unavailable for use by the commercial cannabis business or the sensitive use. This section shall be construed to require measurement from parcel line to parcel line unless the selection committee determines that different points of measure would be appropriate.

Therefore, measurement is from parcel line to parcel line unless the selection committee determines that different points of measure would be appropriate. In this case, the Selection Committee did not determine a different point of measure. Staff notes that as of the date of the most recent Zoning Information Letter, the proposed Commercial Cannabis Business is located within 1,000 feet of nine (9) other sensitive uses consisting of several alcohol related uses and a smoke shop.

Public Correspondence:

Owners of real property located within 300-feet of the proposed site have been notified of this appeal and public hearing and have the opportunity to provide information to the City regarding the proposed site. The Appeal letter and other correspondence received up to the date of publication are attached to the Report. Comments received after publication will be provided to the Commission at the meeting and will be included in the record.

Findings:

The Planning Commission must establish findings to uphold the Selection Committee’s denial of the Amendment Application. Findings for the Planning Commission to consider, pursuant to City Code Section 5-07.09(a)(2), include the following (see attached draft denial resolution):
a. The new site would not be located within the sensitive use distances specified in Section 5-07.27, unless an exception is approved pursuant to that Section; b. The relocation of the new site would not create any significant negative impacts greater than those that existed at the original site;
c. The proposed location is located in an appropriate Zoning District for the proposed use; and
d. Owners of real property located within three hundred feet of the proposed site have been notified and have had the opportunity to provide information to the city regarding the proposed site.

Time Consideration:

The Amendment Application was denied by the Selection Committee on April 13, 2026. On April 21, 2026, pursuant to Municipal Code Section 5-07.10, the Applicant filed a timely appeal within 10 calendar days of the Selection Committee denial. Pursuant to Municipal Code Section 5-

07.10(b), a public hearing before the Planning Commission shall be scheduled within 60-days from the filing of the appeal. Per the Municipal Code, the deadline for Planning Commission 463
Page | 10
consideration is June 20, 2026.

CEQA CONSIDERATION:

Not a Project. The City of Salinas has determined that the proposed action is not a project as defined by the California Environmental Quality Act (CEQA) (CEQA Guidelines Section 15378).

CEQA Guidelines Section 15061 includes the general rule that CEQA applies only to activities which have the potential for causing a significant effect on the environment. Where it can be seen with certainty that there is no possibility that the activity in question may have a significant effect on the environment, the activity is not subject to CEQA. Because the proposed action and this matter have no potential to cause any effect on the environment, or because it falls within a category of activities excluded as projects pursuant to CEQA Guidelines Section 15378, this matter is not a project. Because the matter does not cause a direct or foreseeable indirect physical change on or in the environment, this matter is not a project. Any subsequent discretionary projects resulting from this action will be assessed for CEQA applicability.

Alternatives Available to the Commission (Section 5-07.10):

1. Affirm the Selection Committee’s denial of Valley Farm’s Amendment Application and deny Commercial Cannabis Permit 2025-004;

2. Reverse the Selection Committee’s denial of Valley Farm’s Amendment Application and approve Commercial Cannabis Permit 2025-004; or

3. Modify the Selection Committee’s denial of Valley Farm’s Amendment Application; or In the event of no decision, the matter would be forwarded to City Council for a final determination.

ATTACHMENTS:

Draft Planning Commission Denial Resolution
City Attorney Complete Letter dated March 13, 2026
Police Department Memorandum dated March 16, 2026
City Attorney Denial Letter dated April 13, 2026
Valley Farms Appeal Letter dated April 21, 2026
Sensitive Uses Map for CCP 2025-004
Sensitive Uses Radius Map within 1,000 feet of 2033 North Main Street CCP 2023-006 Valley Farms Renewal
Zoning Information Letter 2025-007 dated December 15, 2025 Zoning Information Letter 2024-010 dated June 11, 2024
Zoning Information Letter 2024-006 dated May 9, 2024
Zoning Information Letter 2024-003 dated April 12, 2024 Zoning Information Letter 2022-011 dated December 14, 2022 Ordinance No. 2566 (N.C.S.) and Report to the City Council Ordinance No. 2597 (N.C.S.) and Report to the City Council 464
Page | 11
Ordinance No. 2598 (N.C.S.) and Report to the City Council Ordinance No. 2600 (N.C.S.) and Report to the City Council Cc: Emerald Skyway LLC (doing business as “Valley Farms”)., Applicant and Appellant Northridge Plaza, LLC, Property Owner
I:\ComDev\Planning Share Space\Cannabis Permits\CCP 2025-004 Emerald Skyway-Valley Farms\CCP 2025-004 PC Staff Report.docx 465
466
467
468
City of Salinas
OFFICEOFTHECITYATTORNEY• 200LincolnAve•Salinas,California 93901 (831) 758-7256 •(831) 758-7257 (Fax)• www.ci.salinas.ca.us Christopher A. Callihan, City Attorney
March 13, 2026
Via Electronic Mail Only: [email protected] Michalah Frey
Emerald Skyway LLC dba Valley Farms
183 Main Street
Rio Vista, California 94571
Re: Emerald Skyway LLC dba Valley Farms; Application for Major Amendment to Commercial Cannabis Permit CCP No. 2024-009 (Major Amendment No. 2025-004) Dear Ms. Frey:

Pursuant to Salinas Municipal Code section 5-07.07(c) the above-referenced Application for Major Amendment (“Application”) was forwarded to the City Attorney’s Office for review to determine whether the Application contains all the required information. We have reviewed the Application and have determined that it contains all the required information.

As required by Salinas Municipal Code section 5-07.07(c) the Application will be forwarded to the Selection Committee appointed by the City Manager. We anticipate the Selection Committee will meet in mid-April to review the Application. We will let you know the Selection Committee has completed its review and made a determination regarding the Application.

Please let us know if you have any questions.

Sincerely,
Christopher A. Callihan
City Attorney
Cc (via email):

Planning Manager
Senior Planner
469
470

Page 1 of 10 ends
← All documents from this meeting