Cities Index.
Agenda packet

San Carlos City Council
January 26, 2026

Document
Agenda packet
Meeting
January 26, 2026
Body
San Carlos City Council
Pages
2
Original file
294.5 MB
Text extracted from the city's file for reading and search. Open the original on cityofsancarlos.primegov.com. That file is the official record.

CITY OF SAN CARLOS
City Council/Successor Agency to the
Redevelopment Agency/Housing Authority
Regular Meeting
January 26, 2026 7:00 PM
Council Chambers, City Hall
600 Elm Street, San Carlos, CA 94070
www.cityofsancarlos.org
AMENDED  AGENDA
This meeting will be conducted both in-person at City Hall and virtually via Zoom. Members of the public will have the option to observe the meeting and address the City Council as outlined below.

In-Person Participation:
• Location. City Hall – 600 Elm Street, Council Chambers. • Provide Public Comment. To address the City Council, fill out a Request to Speak Form located in the back of the Council Chambers and submit it to the City Clerk; or, you may raise your hand when the Mayor calls for public comments.

Remote Participation:
• Observe via:
-    Zoom. https://us02web.zoom.us/j/88256140939; or call 1-669-900-9128 and enter the Meeting ID #: 882 5614 0939
-    Meeting Webportal.  www.cityofsancarlos.org/agenda -    Local TV. Comcast Channel 27 and AT&T Uverse Channel 99 • Provide Public Comment. If you plan to make a public comment, please observe the meeting via Zoom (see above access information), and during the public comment period for the agenda item you wish to address, use the “raise hand” feature. If joining Zoom by phone, press *9 to “raise hand”.

Councilmembers may participate in this meeting remotely pursuant to Government Code 54953.8. 1 MAYOR: Pranita Venkatesh
COUNCIL: John Dugan, Neil Layton, Sara McDowell, Adam Rak

1. CALL TO ORDER

2. TELECONFERENCE ANNOUNCEMENTS BY COUNCIL

3. PLEDGE OF ALLEGIANCE

4. CHANGES TO THE ORDER OF THE AGENDA

5. REPORT FROM CLOSED SESSION

6. PRESENTATIONS
a. Present City Coins to Sean and Gino Bonetti for their Heroic Actions on November 21, 2025.
b. Receive a Presentation from HIP Housing on the Services they Provide to the Community.

7. COUNCIL COMMUNICATIONS AND ANNOUNCEMENTS
Council Communications and Announcements are brief items from members of the City Council regarding upcoming events in the community and correspondence that they have received. They are informational in nature and no action will be taken on these items at this meeting.

8. PUBLIC COMMENT
Persons wishing to address the City Council on matters NOT on the posted agenda may do so. Each speaker is limited to two minutes.

If the item you are speaking on is not listed on the agenda, please be advised that the City Council may briefly respond to statements made or questions posed as allowed under the Brown Act (Government Code Section 54954.2). The City Council's general policy is to refer items to staff for attention, or have a matter placed on a future City Council agenda for a more comprehensive action or report and formal public discussion and input at that time.

9. CONSENT CALENDAR
a. Motion to Waive Reading of All Ordinances.
2 b. Approve the City Council November 24, 2025 Regular Meeting Minutes. c. Approve the City Council December 8, 2025 Regular Meeting Minutes. d. Adopt a Resolution Authorizing the Execution of an Agreement with Consultadd, Inc. for the Migration from a Legacy On-Premise File Server to Microsoft SharePoint Online and OneDrive, in an Amount Not to Exceed $100,000. e. Adopt a Resolution Accepting the Gift of Funds from The Fisher Family Trust in a Combined Amount of $70,000 for the San Carlos Adult Community Center and Youth Center.
f. Adopt a Resolution Approving the Plans and Specifications for the Upgrade of Existing Tennis and Basketball Court Lighting at Burton and Highlands Parks Project (C2102) and Authorizing a Call for Bids.
g. Adopt a Resolution Authorizing the City of San Carlos to Execute a Memorandum of Understanding (MOU) Regarding Composting with the County of San Mateo for Participation in the San Mateo Compost for Climate Solutions Program to Support Senate Bill 1383 Procurement Compliance.
h. Adopt a Resolution Approving the Specifications for the Library Building Painting Project (C2519) and Authorizing a Call for Bids.
i. Deny Claim of Jesseca Carlos.
j. Adopt a Resolution Authorizing the Execution of an Amendment to the Existing Professional Services Agreement with Wallace Roberts & Todd (WRT) in an Amount Not to Exceed $69,900 for Additional Consulting Services Associated with the Extended Timeline of the Downtown Specific Plan.
k. Adopt Ordinance 1632 Amending San Carlos Municipal Code, Title 18 – Zoning Ordinance to Codify the Downtown Specific Plan; and Adopt Ordinance 1633 Adopting the Downtown Specific Plan.

10. NEW BUSINESS
a. Consideration of Appointments to the City Council Regional Joint Powers Authorities, Boards and Committee and Ad Hoc Subcommittees for 2026.

11. AGENDA SETTING
Items discussed in this Agenda Setting Section will be considered by the Council for placing on a future agenda. No action will be taken on these items at this meeting. 3 a. Consideration of Agendizing an Item to Include Lunar New Year and Diwali in the Parks and Recreation Department’s Program of Events and Celebrations.

12. ADJOURNMENT
Any writings or documents provided to a majority of the City Council regarding any item on this agenda will be made available for public inspection upon request.

In compliance with the Americans with Disabilities Act and Title VI, and as outlined in the City’s Reasonable Accommodations Policy, if you need special assistance or translation services to participate in this meeting, please contact the City Clerk’s Office at (650) 802-4222 or via email at [email protected]. Notification in advance of the meeting will enable the City to make reasonable arrangements to ensure accessibility to this meeting. 4 San Carlos City Council/Successor Agency to the
Redevelopment Agency/Housing Authority Regular Meeting
Council Chambers, City Hall
600 Elm Street, San Carlos, CA 94070
November 24, 2025 7:00 PM

MINUTES

ROLL CALL
City Council Present: Sara McDowell, Mayor
Pranita Venkatesh, Vice Mayor
John Dugan, Councilmember
Neil Layton, Councilmember
Adam Rak, Councilmember
Staff Present: Nil Blackburn, Assistant City Manager
Rendell Bustos, Senior Planner
Janice Cheung, Fire Marshall
Akanksha Chopra, Senior Management Analyst
Greg DaCunha, Deputy Fire Chief
Rucha Dande, Principal Planner
Andrew Douglass, Senior Management Analyst
Sajuti Haque, Economic Development and Housing Manager
Paul Harris, Financial Services Manager
Grace Le, City Engineer
Jeff Maltbie, City Manager
Andrea Mardesich, Assistant Community Development Director Rebecca Mendenhall, Administrative Services Director
Crystal Mui, City Clerk
Amy Newby, Parks and Recreation Director
Lisa Porras, Planning Manager
Gregory Rubens, City Attorney
Adolfo Ruelas, Economic Development Coordinator
Al Savay, Community Development Director
Chris Valley, Building Official
Kristie Woo, Associate Planner

1. CALL TO ORDER
Mayor McDowell called the meeting to order at 7:00 p.m.

2. ASSEMBLY BILL 2449 TELECONFERENCE REQUESTS
None.

3. PLEDGE OF ALLEGIANCE
Mayor McDowell led the Pledge of Allegiance.

9.b
January 26, 2026 Packet Pg. 5

4. CHANGES TO THE ORDER OF THE AGENDA
None.

5. REPORT FROM CLOSED SESSION
City Attorney Greg Rubens reported that at its Closed Session earlier this evening, the City Council unanimously appointed Nil Blackburn as the City’s Interim City Manager beginning January 17, 2026.

6. COUNCIL COMMUNICATIONS AND ANNOUNCEMENTS
None.

7. PUBLIC COMMENT
Michael Stafford, resident, spoke regarding the limited availability of tennis courts in the city.

Mayor McDowell noted that the city recently worked on a parks master plan and directed Parks and Recreation Director to reach out to Mr. Stafford with more information.

8. CONSENT CALENDAR
Mayor McDowell removed item ‘k’ – recruitment services, from the Consent Calendar.

MOTION: Adopt City Council Consent Calendar items ‘a’ through ‘j.

MOVER: Dugan
SECONDER: Rak
AYES: Dugan, Layton, Rak, Venkatesh, McDowell
NAYS: None
RESULT: Motion Passed 5 – 0
a. Motion to Waive Reading of All Ordinances.
b. Approve the City Council October 14, 2025 Special Meeting Minutes. c. Approve the City Council October 14, 2025 Regular Meeting Minutes. d. Accept the Fiscal Year 2025-26 First Quarter Investment Report for the Period Ending September 30, 2025.
e. Accept the Fiscal Year 2025-26 First Quarter Financial Report for the Period Ending September 30, 2025.
f. Adopt a Resolution Accepting the Annual Report for the Year Ended June 30, 2025 on Development Impact Fees, Reaffirming the Necessity for the Development Impact Fees, and Making Findings Related to Impact Fee Balances and In-Lieu Fees. Resolution 2025-128 g. Adopt a Resolution Accepting the City of San Carlos' Annual Comprehensive Financial Report (ACFR) for the Fiscal Year Ending June 30, 2025. Resolution 2025-129 h. Adopt a Resolution Authorizing the Execution of a Products and/or Services Agreement with Crayon (Formerly SoftwareOne) for the Renewal of the Annual Microsoft Corporation Enterprise Agreement Until the Microsoft Applications Are Replaced. Resolution 2025-130

9.b
January 26, 2026 Packet Pg. 6

i. Adopt a Resolution Authorizing the Execution of Professional Service Agreements with Goldfarb & Lipman LLP and Burke, Williams & Sorensen, LLP for On-Call Legal Services Related to Economic Development and Housing, Each with an Initial Term of Three Years (with the Option to Extend for Two Additional Years) and an Annual Not-to-Exceed Amount of $200,000.

Resolution 2025-131
j. Adopt a Resolution Authorizing the Execution of a Five-Year Professional Services Agreement with the County of San Mateo for Code Enforcement Services in an Amount Not to Exceed $1,255,181.34. Resolution 2025-132
k. Adopt a Resolution Authorizing the Execution of an Amendment to the Professional Services Contract with Teri Black and Company, LLC for Interim City Manager Recruitment Services in the Amount of $9,400 with a 10% Contingency for a Total Amended Not-to-Exceed Professional Services Contract Amount of $54,400.

Item ‘k’ was removed from consideration.

9. PUBLIC HEARING
a. Consideration of Adopting a Resolution Approving the Addendum to the City of San Carlos 2045 General Plan Reset Environmental Impact Report; Adopting a Resolution Amending the San Carlos General Plan Land Use Map, Land Use Element, and Circulation and Scenic Highways Element; Introducing an Ordinance Amending the San Carlos Zoning Map and Municipal Code, Title 18 - Zoning Ordinance, to Codify the Downtown Specific Plan; and Introducing an Ordinance Adopting the San Carlos Downtown Specific Plan.

Planning Manager Lisa Porras presented the proposed Downtown Specific Plan and, along with Principal Planner Rucha Dande, City Attorney Greg Rubens, Community Development Director Al Savay, Senior Principal Consultant Brian Canepa, Principal Landscape Architect Jim Stickley and City Engineer Grace Le, responded to Council questions.

The Council recessed at 9:00 p.m. and reconvened at 9:07 p.m.

Public Comment
- Charlotte Gomez, representing Sam Trans, requested to maintain the existing zoning for the SamTrans property, noting that upzoning could hinder San Carlos’ housing obligations. - CT voiced support for the proposed food hall and raised concerns regarding the rain gardens, outdoor dining, and parking policies.

At Mayor McDowell’s request, Ms. Porras and Mr. Stickley responded to questions from public comments.

MOTION: Close the Public Hearing.

MOVER: Rak
SECONDER: Dugan
AYES: Rak, Dugan, Layton, Venkatesh, McDowell
NAYS: None
RESULT: Motion Passed 5 – 0

9.b
January 26, 2026 Packet Pg. 7

Council provided the following amendments:
- Engage the City Council in the development and implementation of shared parking policies for non-residential developments, remove parking unbundling requirements for commercial leases, and clearly state that parking unbundling requirements apply to market-rate residential uses.
- Allow umbrellas to either follow the City’s color palette or be compatible with a business’s awning and brand colors, subject to staff discretion, to balance flexibility with a consistent and cohesive aesthetic.
- Remove the term “portable” from heating device regulations, thereby allowing all heaters approved by the Fire Marshal.
- Provide the City Council with additional written clarification regarding bioretention requirements and applicable regulations.
- Allow flexibility in the design and placement of bioretention ponds to protect commercial uses, particularly outdoor dining areas affected by these installations. - Develop a ground-floor activation overlay zone that prioritizes commercial uses in key locations.
- Direct staff to study a citywide stepback requirement to ensure consistency and fairness across all mixed-use neighborhoods adjacent to residential areas.

MOTION: Adopt Resolution 2025-133 Approving the Addendum to the City of San Carlos 2045 General Plan Reset Environmental Impact Report.

MOVER: Dugan
SECONDER: Layton
AYES: Dugan, Layton, Rak, Venkatesh, McDowell
NAYS: None
RESULT: Motion Passed 5 – 0
MOTION: Adopt Resolution 2025-134 Amending the San Carlos General Plan Land Use Map, Land Use Element, and Circulation and Scenic Highways Element MOVER: Venkatesh
SECONDER: Rak
AYES: Layton, Venkatesh, Rak, Dugan, McDowell
NAYS: None
RESULT: Motion Passed 5 – 0
MOTION: Introduce Ordinance 1632 Amending the San Carlos Zoning Map and Municipal Code, Title 18 - Zoning Ordinance, to Codify the Downtown Specific Plan with an amendment to not change the MU -100 zoning for the SamTrans building.

MOVER: Layton
SECONDER: Dugan
AYES: Dugan, Layton, Venkatesh, Rak, McDowell
NAYS: None
RESULT: Motion Passed 5 – 0
MOTION: Introduce Ordinance 1633 Adopting the San Carlos Downtown Specific Plan with amendments as stated by staff.

MOVER: Rak
SECONDER: McDowell
AYES: Rak, Dugan, Layton, Venkatesh, McDowell

9.b
January 26, 2026 Packet Pg. 8

NAYS: None
RESULT: Motion Passed 5 – 0

10. AGENDA SETTING
None.

11. ADJOURNMENT
Mayor McDowell adjourned the meeting at 10:14 p.m.

Crystal Mui,
City Clerk

9.b
January 26, 2026 Packet Pg. 9

San Carlos City Council/Successor Agency to the
Redevelopment Agency/Housing Authority Regular Meeting
Council Chambers, City Hall
600 Elm Street, San Carlos, CA 94070
December 8, 2025 7:00 PM

MINUTES

ROLL CALL

City Council Present: Sara McDowell, Mayor
Pranita Venkatesh, Vice Mayor
John Dugan, Councilmember
Neil Layton, Councilmember
Adam Rak, Councilmember

Staff Present: Nil Blackburn, Assistant City Manager
Samantha Copsey, Deputy City Clerk
Greg DaCunha, Deputy Fire Chief
Steven Machida, Public Works Director
Jeff Maltbie, City Manager
Andrea Mardesich, Assistant Community Development Director Rebecca Mendenhall, Administrative Services Director
Crystal Mui, City Clerk
Mark Myers, Police Chief
Amy Newby, Parks and Recreation Director
Gregory Rubens, City Attorney
Al Savay, Community Development Director
Tracy Scramaglia, Assistant Public Works Director

1. CALL TO ORDER
The meeting was called to order at 7:02 p.m.

2. ASSEMBLY BILL 2449 TELECONFERENCE REQUESTS
None.

3. PLEDGE OF ALLEGIANCE
The Pledge of Allegiance was led by White Oaks Brownie Troop #61920.

4. CHANGES TO THE ORDER OF THE AGENDA
None.

5. COUNCIL COMMUNICATIONS AND ANNOUNCEMENTS
Mayor McDowell recognized several elected officials and former mayors present in the room.

9.c
January 26, 2026 Packet Pg. 10

Council Member Rak wished his daughter, Jane, a happy 21st birthday.

6. PUBLIC COMMENT
Ron Collins, resident and former San Carlos Mayor, spoke in appreciation of soon-to-be retiring City Manager Jeff Maltbie, highlighting his accomplishments during his 15 years of service as City Manager.

Mark Olbert, resident and former San Carlos Mayor, also recognized City Manager Jeff Maltbie and shared personal remarks.

7. CONSENT CALENDAR
MOTION: Adopt City Council Consent Calendar items ‘a’ through ‘d.

MOVER: Dugan
SECONDER: Rak
AYES: Dugan, Layton, Rak, Venkatesh, McDowell
NAYS: None
RESULT: Motion Passed 5 – 0
a. Motion to Waive Reading of All Ordinances.
b. Approve the City Council October 27, 2025 Special Meeting Minutes. c. Approve the City Council October 27, 2025 Regular Meeting Minutes. d. Adopt a Resolution Authorizing the Purchase of a New Vac-con V350/850 Dual Engine Combination Sewer Truck from Municipal Maintenance Equipment in the Amount of $707,520.53.

Resolution 2025-135

8. REORGANIZATION
a. Appoint City of San Carlos’ 2026 Mayor.

Mayor McDowell delivered her outgoing remarks, reflecting on her experience serving as the centennial mayor and highlighting the year-long centennial celebrations and community events.

She also outlined key accomplishments during her term and expressed gratitude to city staff, her council colleagues, and her family for their support.

Public Comment
Twisha Anand, resident, thanked Mayor McDowell for her influence on her path to civic service and commended Vice Mayor Venkatesh's leadership.

Ray Mueller, County Supervisor, presented a certificate of appreciation to Mayor McDowell on behalf of the County Board of Supervisors, praising her service to the community.

Councilmembers expressed appreciation to Mayor McDowell for her leadership and service to the community.

MOTION: Appoint Council Member Pranita Venkatesh as City of San Carlos’ Mayor.

MOVER: Rak

9.c
January 26, 2026 Packet Pg. 11

SECONDER: Layton
AYES: Rak, Dugan, Layton, Venkatesh, McDowell
NAYS: None
RESULT: Motion Passed 5 – 0
Dean Ballback, Mayor Venkatesh’s husband, administered the Oath of Office to her.

Mayor Venkatesh delivered her incoming remarks, sharing her personal background, acknowledging her parents’ sacrifices, and noting the historic significance of becoming San Carlos’ first South Asian mayor. She thanked City staff, particularly retiring City Manager Jeff Maltbie, outlined her vision for an inclusive, family-focused, and vibrant community, and expressed gratitude to her family for their support.

Councilmembers offered congratulatory remarks.
b. Appoint City of San Carlos’ 2026 Vice Mayor.

MOTION: Appoint Council Member Adam Rak as City of San Carlos’ Vice Mayor.

MOVER: Dugan
SECONDER: Layton
AYES: Dugan, Layton, McDowell, Rak, Venkatesh
NAYS: None
RESULT: Motion Passed 5 – 0
City Clerk Crystal Mui administered the Oath of Office to Vice Mayor Rak.

Vice Mayor Rak thanked his colleagues for their support and expressed his commitment to assisting Mayor Venkatesh in her work for the city.

Councilmembers congratulated Vice Mayor Rak and expressed enthusiasm for the leadership of Mayor Venkatesh and Vice Mayor Rak.

9. AGENDA SETTING
None.

10. ADJOURNMENT
Mayor Venkatesh adjourned the meeting at 7:50 p.m. to a social reception in the foyer.

Crystal Mui,
City Clerk

9.c
January 26, 2026 Packet Pg. 12

CITY COUNCIL

STAFF REPORT
MEETING DATE: January 26, 2026
ITEM TITLE: Adopt a Resolution Authorizing the Execution of an Agreement with Consultadd, Inc. for the Migration from a Legacy On-Premise File Server to Microsoft SharePoint Online and OneDrive, in an Amount Not to Exceed $100,000.

RECOMMENDATION:

Staff recommend the City Council adopt a Resolution authorizing the execution of an agreement with Consultadd, Inc. (“Consultadd”) to migrate the City’s legacy on-premise file server to Microsoft SharePoint Online and OneDrive, in an amount not to exceed $100,000.

FISCAL IMPLICATIONS:

There are no fiscal implications, and no additional funding is needed.

The total not-to-exceed amount for the migration project is $100,000 and is budgeted in the adopted budget project # C2312. Of the total amount, $74,000 is allocated for implementation and migration services, $24,000 for optional first-year managed services for support, maintenance, and continuous improvements, and $2,000 for contingency.

BACKGROUND:

The City of San Carlos currently relies on a legacy on-premise file server environment to store departmental shared files and user home directories. While this system has served the City for many years, it limits modern collaboration, search, version control, remote access, and governance capabilities that are now standard within Microsoft Office 365. The City previously migrated to Microsoft Office 365 in 2020; however, SharePoint Online was not fully designed or configured at that time for structured departmental storage.

To address these challenges and modernize the City’s digital workplace, the City issued a request for proposals (RFP) on September 9, 2025 seeking professional services to migrate department drives into modern SharePoint Online department sites and to migrate individual user documents into OneDrive for Business. Proposals were due to the City by 4:00 p.m. on October 6, 2025, and the City received proposals from 17 vendors by the submission deadline.

ANALYSIS:

Following the proposal due date, an RFP selection committee comprised of City staff evaluated all 17 proposals for responsiveness and overall alignment with the RFP requirements. Based on this initial evaluation, the committee narrowed the pool to four finalists—Consultadd, Intellectyx, Bolted Solutions, and Zee Solutions—for interviews and demonstrations.

9.d
January 26, 2026 Packet Pg. 13
Finalist interviews and demonstrations were conducted during the week of December 8, 2025.

During this phase, the committee evaluated each finalist based on proposal completeness, demonstrated understanding of the City’s needs and RFP scope, quality and feasibility of the proposed migration methodology, approach to departmental engagement and data cleanup (including reduction of redundant, outdated, and trivial content), SharePoint site design and information architecture, training and change-management strategy, proposed project timeline and staffing, reference information, and overall pricing and value.

Based on the combined results of proposal scoring, demonstrations, and follow-up review, the selection committee determined that Consultadd offered the best overall value to the City.

Consultadd demonstrated a strong understanding of the City’s objectives, a practical approach to assisting departments with identifying and organizing data prior to migration, and a clear methodology for designing usable SharePoint sites aligned with departmental workflows. Their proposal also included a competitive fixed price, a realistic project schedule, and a structured plan for training and adoption. Staff have conducted reference checks to confirm prior experience with similar SharePoint migration projects.

ALTERNATIVES:

The alternatives available to the City Council include:

1. Adopt a Resolution authorizing the execution of an agreement with Consultadd, Inc. for the migration from a legacy on-premise file server to Microsoft SharePoint Online and OneDrive in an amount not to exceed $100,000; or

2. Do not adopt a Resolution; or

3. Provide staff with alternative direction.

Respectfully submitted by:

Rebecca Mendenhall, Administrative Services Director
Approved for submission by:
_____________________________
Nil Blackburn, Interim City Manager
ATTACHMENT(S):

1. Resolution

2. Consultadd, Inc. Proposal

9.d
January 26, 2026 Packet Pg. 14
RESOLUTION NO. 2026 – ____

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SAN CARLOS AUTHORIZING THE EXECUTION OF AN AGREEMENT WITH CONSULTADD, INC. FOR

THE MIGRATION FROM A LEGACY ON-PREMISE FILE SERVER TO MICROSOFT SHAREPOINT ONLINE AND ONEDRIVE, IN AN AMOUNT NOT TO EXCEED $100,000.

WHEREAS, the City of San Carlos currently relies on a legacy on-premise file server environment to store department files and user home directories, which limits collaboration, search, version control, remote access, and governance capabilities; and WHEREAS, on September 9, 2025, the City issued a request for proposals seeking professional services to migrate the City’s legacy file server environment to SharePoint Online and OneDrive, and proposals were due on October 6, 2025, resulting in the receipt of 17 proposals; and
WHEREAS, a City selection committee evaluated the proposals, conducted finalist interviews and demonstrations during the week of December 8, 2025, and determined that Consultadd, Inc. offered the best overall value to the City based on demonstrated understanding of the project requirements, migration methodology, pricing, and experience; and WHEREAS, funding for this project is available under the City’s Adopted Capital Improvement Program as CIP Project C2312, in a total amount not to exceed $100,000, which includes $74,000 for implementation and migration services, $24,000 for optional first-year managed services for support, maintenance, and continuous improvements, and $2,000 reserved as contingency.

NOW, THEREFORE BE IT RESOLVED, that the San Carlos City Council hereby authorizes the execution of an agreement with Consultadd, Inc. for the migration from a legacy on-premise file server to Microsoft SharePoint online and OneDrive in an amount not to exceed $100,000.
* * * * *
I, City Clerk Crystal Mui, hereby certify that the foregoing Resolution was duly and regularly passed and adopted by the City Council of the City of San Carlos at a scheduled meeting thereof held on the 26th day of January 2026, by the following vote:
________________________________
CITY CLERK of the City of San Carlos
APPROVED:
___________________________
MAYOR of the City of San Carlos
AYES, COUNCILMEMBERS:

NOES, COUNCILMEMBERS:

ABSENT, COUNCILMEMBERS:

9.d
January 26, 2026 Packet Pg. 15
Legacy File Server Migration
to SharePoint Modernization
City of San Carlos
Submitted by

Consultadd Inc.

Division of Public Services
Contact No.

+1 888 771 9958
Email Address

[email protected]
Address

175 Greenwich Street, 38th Floor, New
York, NY, 10007

2445 Augustine Dr Suites 150 and
201, Santa Clara, CA 95054

9.d
January 26, 2026 Packet Pg. 16
Proposal to serve City of San Carlos
Consultadd Inc. – Public Services Division
Proposal in Response to RFP for Legacy File Server Migration to SharePoint Modernization 1 Table of Contents
TRANSMITTAL LETTER ........................................................................................................................................ 2 COMPANY INFORMATION................................................................................................................................................ 3

1. EXECUTIVE SUMMARY – A SMARTER, SAFER, MORE CONNECTED SAN CARLOS ........................................ 4

2. FIRM BACKGROUND – OUR PEOPLE, YOUR PARTNERS ................................................................................. 7

2.1 COMPANY PROFILE & HISTORY .................................................................................................................................. 7

2.2 OUR EXPERIENCE IN CONTEXT................................................................................................................................... 7

2.3 KEY PERSONNEL ROLES & BIOS (ATTACHMENT C Q26) ................................................................................................ 8

2.3 MICROSOFT CERTIFICATIONS & PARTNERSHIPS (ATTACHMENT C Q12) ........................................................................... 9

2.4 STAFFING MODEL (ONSHORE/HYBRID AS PER CITY PREFERENCE) ................................................................................. 10

2.4 SUBCONTRACTORS (ATTACHMENT C Q14) ............................................................................................................... 10

2.5 COMMUNICATION & TOOLS (ATTACHMENT C Q26)................................................................................................... 10

3. GOALS & DESIRED OUTCOMES ................................................................................................................... 12

3.1 OUR SHARED VISION .............................................................................................................................................. 12

3.2 KEY OUTCOMES .................................................................................................................................................... 12

3.3 OPERATIONAL IMPACT............................................................................................................................................ 14

4. PROJECT APPROACH – “YOUR FUTURE-READY DOCUMENT ENVIRONMENT” .......................................... 15

4.1 MIGRATION PHASES ............................................................................................................................................... 16 Phase 1 – Pre-Migration: Laying the Foundation................................................................................................ 16 Phase 2 – Migration: Moving & Modernizing...................................................................................................... 17 Phase 3 – Post-Migration: Adoption & Assurance .............................................................................................. 19

4.2 SHAREPOINT ENHANCEMENT – FROM SHARED DRIVE TO SMART WORKSPACE ............................................................... 20

4.3 DATA SECURITY AND BACKUP CONSIDERATIONS – PROTECTING WHAT MATTERS MOST.................................................. 24

4.4 CHANGE MANAGEMENT PLAN – GUIDING PEOPLE THROUGH THE TRANSITION .............................................................. 27

4.5 USER ACCEPTANCE TESTING (UAT) PLAN – VERIFYING SUCCESS THROUGH THE PEOPLE WHO USE IT ............................... 28

4.6 TOOLS & TECHNOLOGY – OUR TOOLKIT FOR CONFIDENCE......................................................................................... 30

5. WORK PLAN & DELIVERABLES – TURNING MILESTONES INTO MEASURABLE VALUE ................................ 33

6. COST PROPOSAL – INVESTMENT FRAMEWORK .......................................................................................... 37

7. RISK MANAGEMENT – ANTICIPATING, NOT REACTING ............................................................................. 39

8. CONTINUOUS IMPROVEMENT & FUTURE ROADMAP – BUILDING FOR LONG-TERM VALUE ..................... 41

9. PROJECT REFERENCES – RELEVANT EXPERIENCE & PROVEN OUTCOMES ................................................ 43 APPENDIX A – FINANCIAL CAPACITY AND REQUIRED FORMS.........................................................................45

9.d
January 26, 2026 Packet Pg. 17
Proposal to serve City of San Carlos
Consultadd Inc. – Public Services Division
Proposal in Response to RFP for Legacy File Server Migration to SharePoint Modernization 2 Transmittal Letter
Date: October 2, 2025
City Clerk’s Office
City of San Carlos
600 Elm Street
San Carlos, CA 94070
Subject: RFP – Legacy File Server Migration to SharePoint Modernization Dear Selection Committee,
Consultadd Inc. is pleased to submit our proposal in response to the City of San Carlos’s Request for Proposal titled “Legacy File Server Migration to SharePoint Modernization.” We appreciate the opportunity to support the City’s modernization initiative and to help establish a secure, user-friendly, and well-governed Microsoft 365 environment that enables greater collaboration and efficiency across departments.

Consultadd Inc. affirms that we have thoroughly reviewed the RFP and its attachments, understand the project scope, and agree to comply with all terms and conditions of the solicitation and the City’s standard Professional Services Agreement without exceptions.

We also confirm that no subcontractors will be used in the performance of this engagement; all work will be executed directly by our in-house technical team.

We look forward to partnering with the City to deliver a successful SharePoint modernization effort that leverages best practices in migration, governance, and user adoption. Please feel free to contact the undersigned for any clarification or additional information.

Bharat Bhate
Founder and President
Consultadd Inc.

9.d
January 26, 2026 Packet Pg. 18
Proposal to serve City of San Carlos
Consultadd Inc. – Public Services Division
Proposal in Response to RFP for Legacy File Server Migration to SharePoint Modernization 3 Company Information
Name of
Respondent
Consultadd Inc. – Public Services Division
Primary Address: 175 Greenwich Street, 38th Floor
New York, NY 10007
Regional Office 2445 Augustine Dr Suites 150 and 201, Santa Clara, CA 95054
Primary Point of Contact Bharat Bhate, Founder and President Contact number 888-771-9958
Website consultaddpublicservices.com
Primary Contact Email [email protected]
Corporation Type C- Corporation

9.d
January 26, 2026 Packet Pg. 19
Proposal to serve City of San Carlos
Consultadd Inc. – Public Services Division
Proposal in Response to RFP for Legacy File Server Migration to SharePoint Modernization 4

1. Executive Summary – A Smarter, Safer, More Connected San Carlos
The City of San Carlos has set out to modernize its information environment by retiring its aging file server and transforming how staff work with information. Today, over 1.42 TB of legacy content (≈800,000 files) is spread across departmental shares and user home directories, much of it disorganized or redundant (≈57% older than five years). This legacy model creates inefficiencies, complicates compliance with California’s public records obligations, and slows staff in delivering services to the community.

Consultadd Public Services (CAPS) proposes a comprehensive, one-time modernization project that will migrate all relevant content into Microsoft 365 while creating a future-ready SharePoint and OneDrive environment designed around governance, compliance, and user adoption.

Why CAPS
• Public-Sector Proven: Preferred IT vendor for Orange County, San Mateo County, and the City of Sunnyvale.
• Large-Scale Experience: Currently leading North Dakota’s statewide K–12 data migration across 150+ districts and 17 institutions.
• Federal Expertise: Delivered major data modernization for USDA and SBA, helping the latter save $25M through improved scale and automation. • Local Presence: Two California offices (Irvine and Santa Clara) ensure onsite responsiveness combined with national-level expertise.

Our certified team including a Project Manager, Solution Architect, Migration Engineer, Compliance Specialist, Trainer, QA Tester, and Support Engineer — brings both technical depth and governance discipline. This ensures San Carlos gets not only a successful migration, but also a secure and sustainable digital workplace.

Our Approach
We will execute the project in three clear phases:

1. Pre-Migration – Clarity & Design
o Inventory and classify all data (active, inactive, ROT). o Design and configure seven new departmental SharePoint sites plus an intranet landing page.
o Build governance framework (metadata, permissions, retention, DLP). o Deliver a Proof of Concept site for early validation.

9.d
January 26, 2026 Packet Pg. 20
Proposal to serve City of San Carlos
Consultadd Inc. – Public Services Division
Proposal in Response to RFP for Legacy File Server Migration to SharePoint Modernization 5

2. Migration – Execution & Enablement
o Cleanse, migrate, and reconcile ~1.42 TB of data using industry-leading tooling (ShareGate/Quest).
o Apply governance enhancements and compliance controls as content lands.
o Conduct User Acceptance Testing with each department for trust and ownership.
o Train all 117 licensed users, site owners, and IT staff with role-based sessions and guides.

3. Post-Migration – Adoption & Assurance
o Switch legacy servers to read-only and complete final syncs. o Provide 10 weeks of SLA-driven hypercare support for stability and confidence.
o Transfer governance to City IT, with documentation and training for longterm management. o Deliver a future roadmap for automation and CoPilot readiness.

Outcomes for San Carlos
• Streamlined Collaboration: Seven modern SharePoint departmental sites with metadata-driven search and navigation.
• Improved Security: Microsoft Purview retention and DLP policies embedded; all files encrypted at rest and in transit.
• Cost Efficiency: ROT analysis reduces wasted storage and effort; legacy servers retired.
• Scalability: Cloud-native environment that grows with City needs and supports future AI tools.
• Compliance: Automated records retention, eDiscovery readiness, and audit trails built in.
• Confidence: Staff can trust their files are intact; leaders see a stable, governed, future-ready system.

9.d
January 26, 2026 Packet Pg. 21
Proposal to serve City of San Carlos
Consultadd Inc. – Public Services Division
Proposal in Response to RFP for Legacy File Server Migration to SharePoint Modernization 6 Investment Framework
We propose a fixed price of $74,000, covering all phases of the project:
• Migration: $50,000
• SharePoint Sites & Enhancement: $19,000
• Go-Live & Hypercare Support (10 weeks): $5,000
Optional Ongoing Managed Services Support, Maintenance, and Continuous Improvement are available at $24,000 annually should the City wish to extend beyond this one-time capital project.

In Closing
San Carlos is investing not just in a migration, but in a foundation for efficiency, compliance, and resilience. With CAPS’s proven expertise, local presence, and disciplined approach, the City will receive a seamless transition to Microsoft 365, a modernized SharePoint environment tailored to each department, and a confident user community ready to embrace the future of digital work.

9.d
January 26, 2026 Packet Pg. 22
Proposal to serve City of San Carlos
Consultadd Inc. – Public Services Division
Proposal in Response to RFP for Legacy File Server Migration to SharePoint Modernization 7

2. Firm Background – Our People, Your Partners

2.1 Company Profile & History
Consultadd Public Services (CAPS) is a dedicated public-sector IT services firm with over 14 years of experience delivering modernization projects for government agencies across the United States. Founded in 2011, CAPS has grown into a trusted consulting partner with a focus on:
• Cloud migrations (SharePoint, OneDrive, M365, Salesforce, AWS). • Data management & analytics.
• Cybersecurity & governance solutions.
• IT staff augmentation for federal, state, and local governments.

We are incorporated in North Carolina and operate nationally, but maintain strong California presence with two local offices in Irvine and Santa Clara. This ensures San Carlos receives both the stability of a national firm and the responsiveness of a local partner.

CAPS supports 200+ public-sector clients, including federal agencies, statewide education initiatives, and local governments. We have executed 25+ managed services projects and maintain active partnerships with 20+ leading technology providers, including Microsoft, AWS, Salesforce, Oracle, and Elastic.

2.2 Our Experience in Context
San Carlos can take confidence knowing CAPS has already delivered — or is currently delivering projects highly relevant in scale and scope:
• Preferred IT vendor for Orange County, San Mateo County, and the City of Sunnyvale – providing IT modernization, data migration, and governance-focused consulting.
• North Dakota Statewide K-12 SIS Migration (2025) – recently awarded, CAPS is leading the effort to migrate data from 150+ school districts and 17+ institutions into a unified Student Information System. This project mirrors San Carlos’s goals of large-scale file migration, governance alignment, and user adoption.

9.d
January 26, 2026 Packet Pg. 23
Proposal to serve City of San Carlos
Consultadd Inc. – Public Services Division
Proposal in Response to RFP for Legacy File Server Migration to SharePoint Modernization 8 • U.S. Department of Agriculture (USDA) – CAPS executed a data migration modernization for USDA’s inspection division, supporting automation and compliance while eliminating legacy duplication.
• Small Business Administration (SBA) – CAPS migrated SBA data into a Dynamics 365 platform, enabling the agency to handle millions of customer cases, streamline operations, and save over $25 million in operating costs.

Outcome for San Carlos: These references prove CAPS has the depth of experience and credibility to handle both the technical scale (1.42 TB, 117 users) and the governance/compliance expectations of this project.

2.3 Key Personnel Roles & Bios (Attachment C Q26)
We assign a specialized, certified team to ensure success:

Role Key Responsibilities Allocation Certifications /
Experience
Project
Manager
(PM)
Overall governance, project
schedule, stakeholder
reporting, risk management,
City coordination.
~20% PMP Certified; 10+
years managing state &
local government IT
projects.

Solution
Architect
Designs and configures 7
departmental SharePoint sites
+ intranet hub; metadata
schema, permissions,
retention/DLP setup,
governance framework.
~25% Microsoft Certified
Solutions Expert
(MCSE), 12+ years in
SharePoint and M365
architecture.

Migration
Engineer
Executes migration of ~1.42
TB data; configures tooling
(ShareGate/Quest); data
cleansing, ROT handling,
reconciliation reports.
~30% Microsoft 365 Certified:

Enterprise
Administrator Expert;
extensive experience
with large-scale data
migrations.

9.d
January 26, 2026 Packet Pg. 24
Proposal to serve City of San Carlos
Consultadd Inc. – Public Services Division
Proposal in Response to RFP for Legacy File Server Migration to SharePoint Modernization 9 Compliance
Specialist
Aligns SharePoint sites with
CPRA and City retention
schedule; configures retention
labels, sensitivity labels, DLP,
eDiscovery readiness.
~10% Microsoft Security &
Compliance Certified;
background in records
management and
public-sector data
governance.

Trainer /
Change
Lead
Delivers role-based training for
~117 users, site owners, and IT
staff; builds adoption
campaigns, quick guides, and
Q&A sessions.
~7–10% Prosci Change
Management
Practitioner; experience
training 500+
government end users.

QA / Tester Develops and executes UAT
scripts; validates file counts,
permissions, workflows;
manages defect tracking and
remediation.
~5–7% ISTQB Certified Tester;
8+ years quality
assurance and UAT in
public-sector IT.

Support
Engineer
Provides 10 weeks of SLAdriven hypercare support;
resolves technical issues,
optimizes configuration, and
assists City IT with handoff.
~5–7% Microsoft 365 Certified:

Modern Desktop
Administrator; 5+ years
in post-migration
support.

Outcome for San Carlos: A balanced team ensures technical excellence, governance discipline, and strong user adoption without overburdening City staff.

2.3 Microsoft Certifications & Partnerships (Attachment C Q12) CAPS is a Microsoft Partner with expertise in:
• Modern Work (SharePoint, OneDrive, Teams).
• Security & Compliance (Purview, DLP, retention, eDiscovery). • Cloud Solutions (Azure services).

9.d
January 26, 2026 Packet Pg. 25
Proposal to serve City of San Carlos
Consultadd Inc. – Public Services Division
Proposal in Response to RFP for Legacy File Server Migration to SharePoint Modernization 10 Our team members hold certifications such as:
• Microsoft 365 Certified: Enterprise Administrator Expert. • Microsoft Certified Solutions Expert (MCSE) – Productivity. • Microsoft Security Operations Analyst.

We also maintain partnerships with AWS, Salesforce, Oracle, and Elastic, allowing us to integrate across platforms if San Carlos chooses to expand in the future.

2.4 Staffing Model (Onshore/Hybrid as per City Preference) We align with San Carlos’s preference for onshore resources during 8 AM – 5 PM PDT business hours. Our staffing model is:
• Primarily remote delivery – to maximize cost efficiency and speed. • Selective onsite engagement – for kickoff workshops, training, and final cutover checkpoints.
• Local California presence – with offices in Irvine and Santa Clara, our team is accessible and can respond onsite if required.

Outcome for San Carlos: The City receives a hybrid model: cost-effective remote execution combined with local presence for critical milestones.

2.4 Subcontractors (Attachment C Q14)
CAPS has the capacity to staff this project fully in-house and does not require subcontractors for the core migration and SharePoint enhancement. If specialized expertise is engaged (e.g., niche CAD/GIS file handling), subcontractors will be disclosed upfront, and CAPS retains full accountability for their work.

2.5 Communication & Tools (Attachment C Q26)
Project success depends on clear, predictable communication. CAPS will use:
• Weekly progress meetings with City IT and department leads. • Microsoft Teams as the collaboration hub (shared status dashboards, Q&A, updates).

9.d
January 26, 2026 Packet Pg. 26
Proposal to serve City of San Carlos
Consultadd Inc. – Public Services Division
Proposal in Response to RFP for Legacy File Server Migration to SharePoint Modernization 11 • Weekly reconciliation reports showing migration progress and file validation. • Escalation matrix for any critical issues (with defined SLAs).

Outcome for San Carlos: Communication is structured, transparent, and two-way, ensuring stakeholders always know what has been done, what is next, and where risks lie.

9.d
January 26, 2026 Packet Pg. 27
Proposal to serve City of San Carlos
Consultadd Inc. – Public Services Division
Proposal in Response to RFP for Legacy File Server Migration to SharePoint Modernization 12

3. Goals & Desired Outcomes

3.1 Our Shared Vision
The City of San Carlos has a clear vision: create a modern, efficient digital workplace that empowers employees, strengthens compliance, and improves service delivery for the community. Today, over 1.42 TB of legacy data is stored across 800,000+ files, with 104,000 files in user home directories (~179 GB) and 685,000 files in departmental shares (~1.18 TB). Yet, more than 57% of this content is over five years old and no longer actively used. This mix of valuable records and redundant, outdated, or trivial (ROT) files has made collaboration cumbersome, increased IT support overhead, and complicated compliance with retention requirements.

Our proposal is not simply a “lift-and-shift” of files. Instead, it is an intentional modernization that reimagines how the City’s employees will store, access, and share information. By aligning migration with governance, metadata, and training, we will turn fragmented file shares into a future-ready, secure collaboration platform.

3.2 Key Outcomes

1. Streamlined Collaboration
• What we understand: Current file shares lack consistent structure, making it hard for staff to find information quickly. Teams are often duplicating content or storing files in ad-hoc locations.
• Our solution: Each of the City’s seven departments will receive a dedicated SharePoint Online site with standardized architecture, metadata (document type, department, retention category), and navigation. User home folders will be migrated into individual OneDrive accounts for personal storage. • Result: Staff will be able to locate and share files in seconds instead of minutes.

Team folders, correspondence, and records will all live in the right place. • Proof point: Orange County demonstrated that centralizing governance and data management made cloud teams far more efficient, eliminating duplicate “test” sites and accelerating productivity.

2. Improved Security and Protection
• What we understand: Legacy file servers create single points of failure and rely on manual backup procedures. Data protection is inconsistent, and public records obligations increase the stakes for secure storage.

9.d
January 26, 2026 Packet Pg. 28
Proposal to serve City of San Carlos
Consultadd Inc. – Public Services Division
Proposal in Response to RFP for Legacy File Server Migration to SharePoint Modernization 13 • Our solution: Migrating to Microsoft 365 provides enterprise-grade backup, restore, and encryption. We will integrate Microsoft Purview retention policies and DLP safeguards, ensuring compliance with California’s public records requirements.
• Result: Point-in-time restores can be performed in minutes, reducing the risk of lost or corrupted files. City leaders gain confidence that sensitive data is secured at all times.
• Proof point: Orange County now protects 60+ TB of Microsoft 365 data with automated backups and can restore critical content immediately.

3. Cost Avoidance and Efficiency
• What we understand: Maintaining aging servers consumes IT staff time and budget without delivering business value. ROT content (≈57% of files older than five years) inflates storage unnecessarily.
• Our solution: We will apply a ROT analysis during discovery and archive or exclude outdated files in consultation with City IT and department leaders. This reduces migration scope, storage consumption, and IT complexity. • Result: The City avoids spending resources migrating or storing unnecessary data and can retire legacy infrastructure, saving both operational and capital costs. • Proof point: USDA’s modernization eliminated duplicative manual processes and reduced annual maintenance by 69% – saving $1.72 M per year. Similarly, Orange County reclaimed storage space by applying inactivity policies to unused sites.

4. Scalability and Agility
• What we understand: As the City grows – adding new staff, new departments, or new service demands – current infrastructure cannot scale easily. • Our solution: A cloud-native platform in Microsoft 365 scales seamlessly.

SharePoint Online sites can be added as needed, and OneDrive storage automatically expands. Furthermore, this modernization prepares the City for AIdriven productivity tools like Microsoft CoPilot. • Result: The City will not need to purchase additional servers or storage systems to grow. Employees can adopt new tools quickly because the data foundation will already be in place.

9.d
January 26, 2026 Packet Pg. 29
Proposal to serve City of San Carlos
Consultadd Inc. – Public Services Division
Proposal in Response to RFP for Legacy File Server Migration to SharePoint Modernization 14 • Proof point: The SBA’s move to Dynamics 365 enabled it to scale to millions of aid cases virtually overnight, cutting manual overhead and saving $25 M

5. Governance & Compliance
• What we understand: San Carlos must adhere to the California Public Records Act, enforce its records retention schedule, and maintain eDiscovery readiness.

Currently, compliance depends on user discretion rather than system enforcement.
• Our solution: We will enforce retention policies and integrate Microsoft Purview labels to ensure compliant handling of records. Metadata fields will be standardized across all SharePoint sites (e.g., department, retention category), ensuring consistent governance.
• Result: Only documents with business value will move into the new environment, and ongoing governance will maintain compliance automatically. Staff will no longer need to “guess” about retention or disposal.
• Proof point: The City’s own RFP emphasizes that success means stable operations, verified migrations, and user acceptance. Our governance model delivers exactly that – operational stability combined with compliance-by-design.

3.3 Operational Impact
These outcomes go beyond technology:
• For employees: No more wasting time searching for files across drives – they’ll open SharePoint and find what they need. Collaboration will feel natural, not forced.
• For IT staff: No more chasing nightly backups or firefighting file server outages – monitoring and security are baked in.
• For leadership: Confidence that the City’s digital assets are protected, compliant, and future-ready.

In practical terms, this modernization means fewer helpdesk tickets, faster project turnarounds, and greater trust in the City’s information systems. It directly supports San Carlos’s broader goals for efficiency, transparency, and digital resilience.

9.d
January 26, 2026 Packet Pg. 30
Proposal to serve City of San Carlos
Consultadd Inc. – Public Services Division
Proposal in Response to RFP for Legacy File Server Migration to SharePoint Modernization 15

4. Project Approach – “Your Future-Ready Document
Environment”
The modernization effort for San Carlos has two major streams of work running in parallel and converging into a single outcome:

1. SharePoint Enhancement: Building the foundation – modern department sites, intuitive information architecture, metadata and governance rules, retention and compliance features.

2. Data Migration to OneDrive & SharePoint: Moving the City’s 1.42 TB of legacy data (~800,000 files) from the file server into OneDrive for personal documents (~104,000 files, 179 GB) and into departmental SharePoint sites (~685,000 files,

1.18 TB).

Both streams are tightly coordinated, ensuring that as soon as content is migrated, it lands in a modern, governed SharePoint environment designed for collaboration and compliance.

9.d
January 26, 2026 Packet Pg. 31
Proposal to serve City of San Carlos
Consultadd Inc. – Public Services Division
Proposal in Response to RFP for Legacy File Server Migration to SharePoint Modernization 16

4.1 Migration Phases
Phase 1 – Pre-Migration: Laying the Foundation
The Pre-Migration phase establishes clarity, governance, and design before any data is moved. It addresses the “what” and “why” of the migration.

1. Evaluation of Data Sources
We begin with a forensic review of the City’s current storage: the Windows Server 2012 file system and existing Microsoft 365 tenant. This involves confirming numbers provided in Attachment E – ~1.42 TB total, ~104K user files, ~685K departmental files – and identifying special file types (.PST archives, CAD drawings, ZIPs, videos). The outcome is a data inventory baseline that quantifies exactly what will be migrated, what may be excluded, and what requires special handling.

2. Categorization & Prioritization
Files are classified into three categories:
• Active content – operationally critical, frequently accessed, to be migrated immediately.
• Inactive content – >5 years old (~57% of files) but potentially subject to retention.

Candidates for archiving or exclusion.
• Special files – large files >250 MB or with unique handling requirements (CAD/GIS, PST).

We then prioritize migration by department, sequencing them for phased cutovers.

Departments with the highest operational needs (e.g., Finance, Public Works) are scheduled earlier, ensuring mission-critical functions are transitioned first.

3. Governance & SharePoint Design
In parallel, our SharePoint architects design the target environment:
• Seven departmental SharePoint Online sites with consistent layout. • Metadata schema covering document type, department, retention category. • Permissions architecture (owners, members, visitors). • Retention & deletion policies via Microsoft Purview, aligned to the City’s records schedule.

9.d
January 26, 2026 Packet Pg. 32
Proposal to serve City of San Carlos
Consultadd Inc. – Public Services Division
Proposal in Response to RFP for Legacy File Server Migration to SharePoint Modernization 17 This ensures that migrated content lands in a clean, structured environment that supports compliance and usability.

4. Change Management Preparation
We initiate the human side of change: creating communication templates (“What’s coming and why”), adoption guides, and training outlines. We identify departmental champions who will be engaged throughout to validate design decisions.

Pre-Migration Outcome:

By the end of this phase, San Carlos will have:
• A complete migration plan and inventory of all data.
• Configured SharePoint department sites ready to receive content. • Governance rules documented and approved.
• An adoption framework in place, setting the stage for successful user transition.

Phase 2 – Migration: Moving & Modernizing
The Migration phase is where transformation happens. It is structured into six critical internal steps, each designed to reduce risk and maximize operational value.

1. Data Cleansing
Before any migration job, we address technical issues:
• Invalid characters (#, %, &, etc.) replaced automatically. • Overlong paths shortened to meet SharePoint’s 400-character limit. • Large files (>15 GB) flagged and handled separately.
• ROT content excluded or archived with City IT/Dept approval.

This prevents errors, optimizes storage, and ensures only high-value data is migrated.

2. Migration Execution
We use robust migration tooling ShareGate to run department-by-department jobs:
• User folders → OneDrive – ~179 GB mapped to personal OneDrive accounts. • Department shares → SharePoint – ~1.18 TB migrated into new departmental sites.
• Phased waves – one department at a time, typically during evenings/weekends, to avoid disruption.

9.d
January 26, 2026 Packet Pg. 33
Proposal to serve City of San Carlos
Consultadd Inc. – Public Services Division
Proposal in Response to RFP for Legacy File Server Migration to SharePoint Modernization 18

3. Validation & Reconciliation
After each batch, automated reports compare file counts, sizes, and permissions. We share these reports with City IT for transparency. Departmental staff validate sample sets, confirming usability.

4. User Acceptance Testing (UAT)
Each department designates one or more owners to test their new SharePoint sites. UAT scripts guide them to:
• Verify all files are present.
• Test permissions (can the right people access the right content?). • Validate search and navigation.
• Exit criteria: parity of file counts, no broken permissions, functionality approved.

5. SharePoint Enhancements Applied During Migration
As data lands, we apply:
• Retention labels (per retention schedule).
• Sensitivity labels (for confidential data).
• External sharing restrictions (only approved guest access). • Workflow enhancements (e.g., document approval flows).

6. Training Delivery
In parallel, we roll out training to ~117 licensed users, 7 site owners, and 2–3 IT admins.

Training includes:
• Live sessions (hybrid format).
• Quick-reference guides.
• Video tutorials.
• Train-the-trainer model for long-term sustainability.

Migration Outcome:

By the end of this phase, San Carlos will have:
• Cleaned, validated data migrated to OneDrive and SharePoint. • Departmental sites live and in use.
• Staff trained and confident in new tools.
• IT equipped with governance and support playbooks.

9.d
January 26, 2026 Packet Pg. 34
Proposal to serve City of San Carlos
Consultadd Inc. – Public Services Division
Proposal in Response to RFP for Legacy File Server Migration to SharePoint Modernization 19 Phase 3 – Post-Migration: Adoption & Assurance
Once migration is complete, focus shifts to stabilization, adoption, and continuous improvement.

1. Go-Live & Cutover
Legacy servers are switched to read-only. Users are officially redirected to OneDrive/SharePoint for all work. A final incremental sync captures any last-minute changes.

2. Hypercare & Support
We provide 10 weeks of SLA-driven support. This includes:
• Critical issues resolved within 4 hours.
• Daily monitoring of SharePoint and OneDrive usage.
• Dedicated escalation paths for department heads.

3. Change Management & Adoption Support
We continue communication: “tip of the week” emails, adoption dashboards (showing usage rates), and surveys to gather feedback. Department champions lead by example, reinforcing adoption.

4. Governance Handover
We deliver full documentation to City IT:
• Site lifecycle management (provisioning, archival, deletion). • Retention/deletion policies.
• Permission structures.
• We train IT staff to independently manage governance.

5. Future-Readiness
We provide a roadmap for future enhancements:
• Automating workflows (document approvals, routing).
• Leveraging Microsoft CoPilot for drafting/search.
• Expanding Teams integration for collaboration.

9.d
January 26, 2026 Packet Pg. 35
Proposal to serve City of San Carlos
Consultadd Inc. – Public Services Division
Proposal in Response to RFP for Legacy File Server Migration to SharePoint Modernization 20 Post-Migration Outcome:

By the end of this phase, San Carlos will have:
• Fully cut over from legacy servers.
• Confident, productive users working in the cloud.
• IT staff managing governance independently.
• A roadmap for continuous improvement.

4.2 SharePoint Enhancement – From Shared Drive to Smart Workspace
Modernizing San Carlos’s information environment is not only about migrating files; it is about transforming SharePoint into a secure, intuitive, and governed digital workplace. The City’s current SharePoint usage is limited, with files primarily added adhoc through Teams or by individual users without consistent oversight. Our enhancement approach will deliver a structured, future-ready SharePoint Online platform that supports daily operations, records compliance, and long-term innovation.

1. Modern Departmental Sites
We will establish seven departmental SharePoint Online sites – one for each City department – plus an optional intranet landing page to serve as a digital “front door” connecting staff to all sites. Each departmental site will include:
• Standardized architecture: Libraries, lists, and pages configured consistently across departments.

9.d
January 26, 2026 Packet Pg. 36
Proposal to serve City of San Carlos
Consultadd Inc. – Public Services Division
Proposal in Response to RFP for Legacy File Server Migration to SharePoint Modernization 21 • Metadata-driven navigation: Columns such as document type, department, retention category for intuitive search.
• Role-based access: Owners, members, and visitors groups aligned with the City’s Active Directory/Teams structure.

Departmental SharePoint Sites – Tailored Foundations for Every Team While every department will share a common framework (architecture, metadata, governance), each will also receive unique enhancements tailored to their work.

Steps to Create & Enhance Departmental Sites

1. Discovery Workshops: Engage each department to understand workflows, records, and compliance obligations.

2. Baseline Setup: Deploy a standard SharePoint template with consistent libraries, metadata schema, and permissions.

3. Customization: Add features unique to departmental needs (see table below).

4. Governance & Permissions: Assign site owners and content managers; apply sensitivity labels and external sharing rules.

5. Validation & Training: Run UAT sessions with departmental champions and deliver role-based training.

Unique Enhancements by Department

Department Unique SharePoint
Enhancements
Value Delivered
Administration Centralized policy library,
executive document workflows,
Council agenda/reports hub.

Streamlined Council
reporting and faster
approvals.

Finance Metadata for fiscal years,
budgets, contracts; audit-ready
financial libraries.

Simplified audits, accurate
recordkeeping, stronger
compliance.

9.d
January 26, 2026 Packet Pg. 37
Proposal to serve City of San Carlos
Consultadd Inc. – Public Services Division
Proposal in Response to RFP for Legacy File Server Migration to SharePoint Modernization 22 Human
Resources
Restricted HR file library;
onboarding workflows; sensitivity
labels.

Privacy protection, faster
onboarding, CPRA
compliance.

Public Works Libraries for permits, project files,
CAD/GIS support; retention
policies.

Central hub for engineering
docs, large-file handling,
compliance.

Community
Development
Site structure for zoning, permits,
licenses; external contractor
integration.

Supports permitting, secure
external sharing.

Parks &
Recreation
Event scheduling, vendor contract
library, image/video repository.

Easier program planning,
vendor management, media
access.

IT/City Clerk Central records repository;
retention & eDiscovery controls;
governance center.

Enforces compliance,
simplifies FOIA/public
record requests.

9.d
January 26, 2026 Packet Pg. 38
Proposal to serve City of San Carlos
Consultadd Inc. – Public Services Division
Proposal in Response to RFP for Legacy File Server Migration to SharePoint Modernization 23

What Makes Our Enhancement Unique
• Balance of Standardization & Flexibility: Consistency across departments, but tailored features where needed.
• Compliance Embedded: Retention, audit logging, and DLP applied to every site. • Operational Value: Beyond storage – workflows, CAD/GIS support, onboarding, dashboards.
• Future-Ready Design: Sites structured for AI integration (e.g., Microsoft CoPilot) to support smarter search and drafting.

Outcome: Files are no longer buried in complex folder hierarchies. Staff will search and navigate by meaningful categories, instantly locating critical documents.

2. Governance Framework & Lifecycle Management
To ensure SharePoint remains clean and well-governed, we will implement a governance framework that includes:
• Site provisioning process: Requests → approval → creation → archival → deletion.
• Lifecycle standards: Archiving or deleting inactive sites to manage sprawl. • Departmental ownership: Each site will have a designated site administrator. • IT oversight: Long-term governance by City IT, with department input on content value.

Outcome: SharePoint evolves sustainably, preventing the sprawl and disorganization that plagued legacy file servers.

3. Permissions & External Sharing Controls
Permissions will be modernized to reflect real business needs:
• Simplified access: Clear role definitions (owners, contributors, readers). • Guest access: Limited, with expiration dates and approval workflows. • Information barriers: Restrictions between sensitive areas (e.g., HR vs. general staff).

9.d
January 26, 2026 Packet Pg. 39
Proposal to serve City of San Carlos
Consultadd Inc. – Public Services Division
Proposal in Response to RFP for Legacy File Server Migration to SharePoint Modernization 24 Outcome: Employees gain the access they need without over-provisioning, while guest sharing remains secure and compliant.

4. Compliance & Records Retention
Compliance is embedded directly into SharePoint:
• Retention labels & policies: Auto-applied (e.g., contracts = 7 years). • eDiscovery readiness: Support for legal holds and investigations. • DLP policies: Prevent accidental sharing of sensitive data. • Audit & reporting: Logging of key activities (sharing, permissions, deletions).

Outcome: Records management is automated, and leaders gain confidence in audit readiness.

5. Enhanced Operational Value
We will make SharePoint more than just a repository:
• Workflows: Document approvals with Power Automate.
• Teams integration: Linking SharePoint libraries directly with Microsoft Teams. • Dashboards: For project or departmental metrics (future phases). • Intranet landing page: News, resources, and quick access to sites.

Outcome: SharePoint becomes a daily productivity tool that actively supports City operations.

6. User Experience & Training Integration
Adoption depends on usability and confidence. Our enhancements will be supported by:
• Role-based training: End users learn collaboration basics; site owners/admins learn governance and reporting.
• Quick guides & videos: Easy references for all 117 licensed users. • Change champions: Departmental site owners empowered to support adoption.

Outcome: Employees receive not only a new system but also the skills and confidence to use it effectively.

4.3 Data Security and Backup Considerations – Protecting What Matters Most
Ensuring that San Carlos’s 1.42 TB of legacy data is secure during and after migration is central to our approach. We recognize that files contain not only operational records but

9.d
January 26, 2026 Packet Pg. 40
Proposal to serve City of San Carlos
Consultadd Inc. – Public Services Division
Proposal in Response to RFP for Legacy File Server Migration to SharePoint Modernization 25 also sensitive information subject to California Public Records Act (CPRA), retention schedules, and public accountability. Our data security and backup approach combines industry best practices, Microsoft 365 native safeguards, and third-party enhancements to provide full confidence that data will remain protected and recoverable throughout the project lifecycle.

1. Security by Design During Migration
• Encrypted Transfers: All data migration traffic will be encrypted in transit using TLS 1.2+. Staging in Azure (if required) uses encrypted Blob storage. • Least-Privilege Access: Migration accounts are configured with temporary, leastprivilege permissions, and audited continuously. Once cutover is complete, these accounts are revoked.
• Audit Logs: Every migration job is logged, including file counts, changes, and any errors, so there is a complete forensic trail.
• Isolation of ROT Content: Redundant/outdated files flagged for archiving are separated into restricted repositories to avoid accidental exposure.

Outcome: Sensitive files never leave controlled, encrypted channels, and administrators have clear oversight of every migration action.

2. Backup and Recovery During Migration
• Pre-Migration Backups: The entire legacy server is backed up before migration begins, ensuring a “restore point” is always available in case of rollback. • Incremental Syncs: We use iterative migration passes, meaning that after the initial bulk load, only deltas (changed/new files) are synced. This reduces risk of data mismatch or loss.
• Rollback Plan: Should a critical failure occur, departments can continue working from the existing file server until issues are resolved.

Outcome: At no point does the City risk a gap in coverage; data can always be restored or rolled back.

9.d
January 26, 2026 Packet Pg. 41
Proposal to serve City of San Carlos
Consultadd Inc. – Public Services Division
Proposal in Response to RFP for Legacy File Server Migration to SharePoint Modernization 26

3. Security Controls in the New Environment
• Encryption at Rest: Microsoft 365 automatically encrypts all SharePoint and OneDrive files at rest with AES-256 bit encryption.
• Conditional Access & MFA: Administrative and high-privilege accounts will be enforced with multi-factor authentication and conditional access policies. • Data Loss Prevention (DLP): Microsoft Purview DLP rules will be configured to detect sensitive information (financial, PII) and prevent accidental sharing. • External Sharing Restrictions: Guest access will be controlled with explicit approvals, expiration policies, and limited sharing rights.

Outcome: The City gains a hardened digital workspace that prevents unauthorized access and supports regulatory obligations.

4. Backup & Business Continuity Post-Migration
• Third-Party Backup Integration: The City already employs third-party backup solutions for Microsoft 365. We will review and validate these, ensuring they cover SharePoint, OneDrive, and Exchange, and recommending enhancements where gaps exist.
• Native Redundancy: Microsoft 365 stores content in geo-redundant datacenters, ensuring high availability (99.9% SLA).
• Retention & Recovery: SharePoint’s recycle bins, version history, and Purview retention labels will provide multiple layers of file recovery options, from userdriven restores to IT-led legal holds. • Disaster Recovery Testing: During the post-migration support window, we will perform a sample recovery test, demonstrating file restoration from backup to assure stakeholders of resilience.

Outcome: The City can recover from accidental deletion, corruption, or ransomware with minimal downtime, meeting continuity-of-operations needs.

5. Value to the City
This security and backup approach delivers peace of mind to San Carlos:

9.d
January 26, 2026 Packet Pg. 42
Proposal to serve City of San Carlos
Consultadd Inc. – Public Services Division
Proposal in Response to RFP for Legacy File Server Migration to SharePoint Modernization 27 • Employees can work confidently, knowing their files are protected. • IT staff will no longer spend time manually backing up servers – instead, automated policies ensure coverage.
• Leadership can demonstrate compliance with public records, retention, and audit requirements.
• The City is positioned to handle future cyber risks with a resilient Microsoft 365 backbone.

4.4 Change Management Plan – Guiding People Through the Transition
Technology change only succeeds if people embrace it. Our change management plan focuses on communication, inclusion, and empowerment so San Carlos employees feel supported every step of the journey.

9.d
January 26, 2026 Packet Pg. 43
Proposal to serve City of San Carlos
Consultadd Inc. – Public Services Division
Proposal in Response to RFP for Legacy File Server Migration to SharePoint Modernization 28 Core Elements

1. Early Awareness & Buy-In
o Launch communications in Phase 1 explaining why the City is modernizing, how it affects employees, and the benefits (e.g., faster search, stronger compliance).
o Department champions are identified early to act as trusted voices inside each team.

2. Ongoing Communication
o Regular updates at key milestones (pilot, first migration, go-live). o Weekly “What’s New” or “Tips” messages to keep staff engaged. o Dedicated Teams channel or intranet page where employees can access FAQs, guides, and updates.

3. Leadership Engagement
o City leadership communicates support and sets expectations. o Department heads reinforce the importance of participation in UAT and training.

4. Training & Empowerment
o Role-based training: end users, site owners, and IT staff. o Bite-sized videos and guides so staff can learn at their own pace. o “Ask-me-anything” Q&A sessions during rollout.

5. Feedback & Continuous Improvement
o Surveys and open forums to capture staff sentiment.
o Feedback loops ensure concerns are addressed quickly.

Outcome for San Carlos
Employees won’t feel blindsided by a sudden switch they will feel prepared, included, and supported. Resistance is reduced, adoption increases, and the new system quickly becomes the natural way of working.

4.5 User Acceptance Testing (UAT) Plan – Verifying Success Through the People Who Use It
User Acceptance Testing (UAT) ensures that the system works not just technically, but practically for City staff. We view UAT as an opportunity for departments to validate, take ownership, and build confidence before full cutover.

Structure of UAT

9.d
January 26, 2026 Packet Pg. 44
Proposal to serve City of San Carlos
Consultadd Inc. – Public Services Division
Proposal in Response to RFP for Legacy File Server Migration to SharePoint Modernization 29

1. Preparation
o Develop UAT scripts tailored to departmental workflows (e.g., Finance tests uploading budgets; HR tests securing personnel files). o Identify UAT participants: at least one representative from each of the 7 departments, plus IT staff.

2. Execution
o After each department’s migration, UAT participants test their new SharePoint site or OneDrive using the scripts.
o Key validation checks include:
§ File integrity: Counts and sizes match source.
§ Permissions: Correct staff can access, no one is over-provisioned. § Navigation & search: Metadata and filters work as intended. § Workflows: Sample document approval or sharing process functions correctly.

3. Defect Management
o Any discrepancies are logged and addressed immediately. o Migration jobs are re-run for missing or mismatched files.

4. Sign-Off & Ownership
o Departments provide written sign-off once their data and site function as expected.
o This sign-off represents both technical validation and cultural ownership of the new platform.

Outcome for San Carlos
UAT turns abstract promises into real trust. Departments see that their files are intact and their new sites function as promised. Staff walk away with confidence, knowing they had a hand in testing and approving the solution. Leadership gains proof of quality before decommissioning the old servers.

9.d
January 26, 2026 Packet Pg. 45
Proposal to serve City of San Carlos
Consultadd Inc. – Public Services Division
Proposal in Response to RFP for Legacy File Server Migration to SharePoint Modernization 30

4.6 Tools & Technology – Our Toolkit for Confidence
Successful migration is not only about process but also about the tools we use to protect data, accelerate migration, and ensure accuracy. San Carlos’s modernization will be supported by a carefully chosen technology stack that combines Microsoft-native capabilities with proven third-party solutions.

1. Migration Tooling
We will use industry-leading migration platforms to ensure reliable and efficient transfer of ~1.42 TB of data (~800,000 files) into SharePoint and OneDrive. Options include:
• ShareGate – widely used for SharePoint/OneDrive migrations; excels at permissions mapping, metadata preservation, and ROT identification. • Quest or AvePoint – robust alternatives that handle large volumes, support throttling, and generate reconciliation reports.
• Microsoft Native Tools – where appropriate, Microsoft’s Migration Manager and PowerShell scripts will be leveraged for smaller datasets or specific cases.

Outcome for San Carlos: The City benefits from proven, automated tools that reduce risk of data loss, preserve metadata (created/modified dates, permissions, version history), and speed up migration.

9.d
January 26, 2026 Packet Pg. 46
Proposal to serve City of San Carlos
Consultadd Inc. – Public Services Division
Proposal in Response to RFP for Legacy File Server Migration to SharePoint Modernization 31

2. Backup & Disaster Recovery Approach
Even with reliable tools, we approach migration with a “trust but verify” mindset:
• Pre-Migration Backups: Legacy file server data will be backed up before migration begins, ensuring a safe restore point.
• Incremental Migration: Data will be moved in stages, with delta syncs capturing any changes made during the migration window.
• Post-Migration Recovery: SharePoint and OneDrive are protected by Microsoft’s geo-redundant storage, recycle bins, and version history. We will validate these features and integrate with the City’s existing third-party backup solution. • Disaster Recovery Validation: During the hypercare period, we will perform sample restores to demonstrate recovery capability.

Outcome for San Carlos: At every point, the City has assurance that data can be restored, protecting against technical errors, user mistakes, or unforeseen issues.

3. Licenses & Responsibilities (Attachment C Q28–Q29)
• Migration Tool Licenses: The selected vendor (us) will provide and manage licensing for the migration tooling (ShareGate/Quest/AvePoint). The City will not be asked to procure these tools separately.
• Microsoft 365 Licenses: The City already maintains Microsoft 365 E3 licenses for ~117 users. These will continue to provide the base services (OneDrive, SharePoint Online, Teams). Any future CoPilot or Purview add-on licenses, if desired, will be procured by the City.
• Third-Party Backup Licenses: The City currently has a third-party backup solution.

We will review it and recommend enhancements if necessary, but the City will retain responsibility for licensing these long-term tools.

Outcome for San Carlos: The City avoids hidden costs or tool confusion. All migration tooling is included in our scope, while Microsoft 365 licensing remains under City ownership and control.

9.d
January 26, 2026 Packet Pg. 47
Proposal to serve City of San Carlos
Consultadd Inc. – Public Services Division
Proposal in Response to RFP for Legacy File Server Migration to SharePoint Modernization 32

4. Why These Tools Matter
• Speed: Bulk migration jobs can move hundreds of GBs overnight, keeping the project on schedule.
• Accuracy: Permissions and metadata are preserved, preventing data integrity issues.
• Transparency: Tools generate reconciliation and audit reports that we share weekly with the City.
• Resilience: Backup and DR strategies mean that even in a worst-case scenario, data is safe and recoverable.

9.d
January 26, 2026 Packet Pg. 48
Proposal to serve City of San Carlos
Consultadd Inc. – Public Services Division
Proposal in Response to RFP for Legacy File Server Migration to SharePoint Modernization 33

5. Work Plan & Deliverables – Turning Milestones Into
Measurable Value
Each deliverable in our work plan is designed to give San Carlos something tangible and useful not just a technical artifact. By the time we finish each step, City leaders, IT staff, and employees will have new clarity, new confidence, or new capability.

Discovery & Analysis Report (Q3, Q27)
This report is more than a data scan — it is a map of the City’s digital landscape. It will show:
• Exactly how much data exists (≈1.42 TB across ~800,000 files). • How that content breaks down: ~104K user files in OneDrive vs. ~685K departmental files in SharePoint targets.
• Which content is still valuable vs. which 57% has aged over 5 years and can be archived.

Outcome for San Carlos: Instead of wondering “what’s on the server,” City leaders will finally see the full picture of their information estate, making governance decisions with facts in hand.

Proof of Concept Site (1 department, permissions, metadata, workflows) This is a working model of the future, built with one department’s real structure and sample files. It lets staff test:
• Metadata-driven navigation instead of digging through folders. • Permissions and access roles aligned to their team.
• A sample workflow, like an approval chain, running on live documents.

Outcome for San Carlos: Employees don’t have to imagine what the new system will feel like they can walk through it, give feedback, and shape the final design before full rollout.

Migration Playbook (risk, rollback plan – Q9, Q24)
The playbook spells out every step of migration. It doesn’t just say “we’ll move files,” it shows:
• Which department goes first, and on what date.
• What risks are expected (like large CAD files or ROT cleanup) and how they’ll be managed.

9.d
January 26, 2026 Packet Pg. 49
Proposal to serve City of San Carlos
Consultadd Inc. – Public Services Division
Proposal in Response to RFP for Legacy File Server Migration to SharePoint Modernization 34 • What rollback looks like if an issue arises.

Outcome for San Carlos: No surprises, no black boxes. Everyone — from IT to department heads — will know the plan, the risks, and the safety nets before migration begins.

Reconciliation Reports (weekly – Q20, Q31)

Every week, you will receive a report comparing “before” and “after” counts for files, sizes, and permissions. If there are 68,574 files in Finance on Friday, you will see 68,574 files in Finance on Monday — with proof in hand.

Outcome for San Carlos: Assurance that nothing has been lost or corrupted.

Departments will trust the new system because they can see their content accounted for in black and white.

Training Materials (Q25)
Instead of handing staff a new system and saying “good luck,” we will deliver clear, rolebased training:
• Quick guides showing how to share securely.
• Short videos for daily tasks (uploading, searching, co-authoring). • Q&A sessions where staff can ask questions live.

Outcome for San Carlos: Employees won’t feel left behind. They will walk into the new system with confidence, reducing support tickets and boosting adoption.

Change Management Plan (Q5, Q15, Q16, Q22)
This is the human side of migration:
• City-wide announcements that explain “why this change matters.” • Departmental champions leading the way.
• Ongoing communications after go-live to keep momentum strong.

Outcome for San Carlos: Staff don’t just receive a new tool they understand the purpose, feel included in the change, and embrace the system as their own.

Post-Go-Live Support Plan (Q10)
We will stand with San Carlos for 10 weeks after launch, with clear SLAs for resolving issues. This means not just IT troubleshooting, but active coaching and optimization.

9.d
January 26, 2026 Packet Pg. 50
Proposal to serve City of San Carlos
Consultadd Inc. – Public Services Division
Proposal in Response to RFP for Legacy File Server Migration to SharePoint Modernization 35 Outcome for San Carlos: Employees know help is close at hand. Leaders see a smooth transition period where issues are quickly addressed, ensuring long-term stability.

Outcome-Driven Timeline - From Planning to Adoption

Phase Activities Duration Key Outcomes for San
Carlos
Phase 1 –
Pre-Migration
(Weeks 1–4)
• Kickoff & stakeholder
alignment
• Discovery & Analysis
Report (inventory, ROT,
data categorization)
Governance &
SharePoint design (7
new departmental sites,
intranet hub)
• Proof of Concept site
for 1 department
• Change Management
launch (citywide
awareness, champions
identified)
• Draft Migration
Playbook (schedule,
risks, rollback strategy)
4 weeks
Clear visibility of 1.42 TB
of legacy data (~800,000
files). Governance and
design decisions finalized.

Staff begin to understand
“what’s coming and why.”
Early trust built through
PoC site.

Phase 2 –
Migration
(Weeks 5–12)
• Data cleansing (invalid
paths, large files, ROT
exclusion)
• Department-bydepartment migration
waves
• Weekly reconciliation
reports (file counts,
parity)
• UAT for each
department (scripts,
6 weeks
Departments
progressively move into
their new SharePoint sites
and OneDrive. Staff see
files intact and begin
working in the modern
environment. UAT signoffs create confidence.

Training reduces friction.

Legacy server remains as

9.d
January 26, 2026 Packet Pg. 51
Proposal to serve City of San Carlos
Consultadd Inc. – Public Services Division
Proposal in Response to RFP for Legacy File Server Migration to SharePoint Modernization 36 validation, sign-off)
Training delivery (rolebased for 117 users, 7
site owners, 2–3 admins)
• Change Management
reinforcement (tips,
updates, FAQs)
• Apply SharePoint
enhancements
(metadata, retention,
DLP, workflows)
safety net until full
cutover.

Phase 3 –
PostMigration
(Weeks 13–
20)
• Cutover (legacy file
server read-only, final
sync)
• 10 weeks of hypercare
support (SLA-driven
issue resolution)
• Change Management
sustainment (adoption
dashboards, surveys)
• Governance handover
to City IT (site lifecycle,
retention policies)
• Post-Go-Live Support
Plan executed
• Future roadmap
delivered (automation,
CoPilot readiness)
10 weeks
Staff fully transitioned to
SharePoint/OneDrive. IT
owns governance.

Employees trust and
adopt the system. Leaders
see stability, compliance,
and a roadmap for
continuous improvement.

9.d
January 26, 2026 Packet Pg. 52
Proposal to serve City of San Carlos
Consultadd Inc. – Public Services Division
Proposal in Response to RFP for Legacy File Server Migration to SharePoint Modernization 37

6. Cost Proposal – Investment Framework
Consultadd Public Services is committed to delivering this project as a fixed-price engagement, aligning with the City of San Carlos’s preference for cost certainty. Our proposed total cost for the one-time project is $74,000, which includes all migration, SharePoint enhancement, training, and post-go-live support.

This investment is structured into three segments:

Segment Scope of Work Cost
Migration - Migration of ~1.42 TB (~800,000 files) from legacy file server to OneDrive and departmental
SharePoint sites.
- Data cleansing, ROT analysis, and reconciliation
reports.
- User Acceptance Testing (UAT) with each
department.
- Training sessions for ~117 end users, site
owners, and IT staff.
$50,000
SharePoint Sites &
Enhancement
- Creation of 7 new departmental SharePoint
sites and an optional intranet landing page.
- Metadata schema, permissions model,
retention/DLP configuration.
- Department-specific enhancements (e.g.,
Finance audit trails, HR restricted libraries, Public
Works CAD/GIS handling).
$19,000
Go-Live & Hypercare
Support (10 Weeks)
- SLA-driven support for ~10 weeks post cutover.
- Rapid issue resolution, optimization, and user
coaching.
- Knowledge transfer to City IT staff.
$5,000
Total Project
Investment
$74,000

9.d
January 26, 2026 Packet Pg. 53
Proposal to serve City of San Carlos
Consultadd Inc. – Public Services Division
Proposal in Response to RFP for Legacy File Server Migration to SharePoint Modernization 38 Optional Ongoing Services (Not Included in One-Time Cost) While this project is scoped as a one-time capital investment, the City may wish to extend its value through an ongoing managed services engagement.

Optional Service Scope of Work Annual
Cost
Managed Services – Support,
Maintenance & Continuous
Improvement
- Extended technical support for
SharePoint and OneDrive.
- Ongoing governance reviews
and retention adjustments.
- Monitoring and issue resolution.
- New workflow automation and
optimization.
- Advisory services for adopting
Microsoft CoPilot or other M365
features.
$24,000
per year
Outcome for San Carlos
• The $74,000 fixed-price project delivers a complete, risk-managed migration, a fully modernized SharePoint environment, and 10 weeks of hypercare support. • The optional managed services provides the City with flexibility — ensuring that if leadership decides they want continuous improvement, adoption reinforcement, or longer-term support, the cost and scope are clearly defined.

9.d
January 26, 2026 Packet Pg. 54
Proposal to serve City of San Carlos
Consultadd Inc. – Public Services Division
Proposal in Response to RFP for Legacy File Server Migration to SharePoint Modernization 39

7. Risk Management – Anticipating, Not Reacting
Every migration carries risks, but the difference between a smooth transition and a disruptive one is planning ahead with clarity and contingencies. For San Carlos, our risk management approach is built around prevention, transparency, and rollback assurance.

Our Strategy
• Proactive Identification: Risks are identified during Discovery and logged into a central risk register.
• Mitigation Planning: For each risk, we define preventive actions and fallback measures before migration begins.
• Rollback Capability: Legacy file servers remain intact until departments validate their new sites. If needed, we can roll back to a known safe state at any time. • Transparent Reporting: Weekly reconciliation reports will include not only migration stats but also risk status updates, keeping leadership fully informed.

Sample Risk Register – Top 5 Risks for San Carlos

Risk Impact Mitigation Strategy Rollback/Contingency
Large/Complex
Files (CAD, PST,
>15 GB)
Migration
failures,
delays
Pre-scan and isolate
large files; use
specialized handling
or alternative storage.

Legacy copy preserved
until migrated
successfully.

ROT Content
(~57% aged >5
yrs)
Wasted
effort,
storage
costs, clutter
ROT analysis with
departments; archive
or exclude outdated
files.

Keep archived ROT in
separate repository for
reference.

Permission
Mapping Errors
Wrong
access
(over/under
sharing)
Use tooling
(ShareGate/Quest) to
map NTFS to
SharePoint groups;
test in pilot.

Legacy access remains
intact until validated by
UAT.

9.d
January 26, 2026 Packet Pg. 55
Proposal to serve City of San Carlos
Consultadd Inc. – Public Services Division
Proposal in Response to RFP for Legacy File Server Migration to SharePoint Modernization 40 Downtime or
Business
Disruption
Reduced
productivity
Department-bydepartment phased
migration; schedule
cutovers off-hours.

Resume access to legacy
server if migration fails.

User Resistance Low
adoption,
shadow IT
use
Role-based training,
department
champions, ongoing
comms.

Extend
training/adoption
support during
hypercare.

The City will never be caught off-guard. Every potential risk has a plan, every migration has a safety net, and every department has ownership in validating success.

9.d
January 26, 2026 Packet Pg. 56
Proposal to serve City of San Carlos
Consultadd Inc. – Public Services Division
Proposal in Response to RFP for Legacy File Server Migration to SharePoint Modernization 41

8. Continuous Improvement & Future Roadmap – Building for Long-Term Value
The City of San Carlos has framed this project as a one-time capital investment: a complete migration of ~1.42 TB of data into a modern, secure Microsoft 365 environment. Our role is to deliver a successful migration and enhanced SharePoint foundation that achieves all project goals within the budgeted scope.

That said, we recognize that technology continues to evolve and that the City’s operational needs will grow. While our engagement concludes at project close, the design choices and frameworks we implement will ensure the City can sustain, govern, and improve its Microsoft 365 environment without needing ongoing outside assistance.

What We Deliver to Enable Ongoing Improvement

1. Governance Framework for City IT
o We will establish a site lifecycle process (provisioning → archival → deletion) that City IT can execute annually to prevent sprawl. o Retention and compliance policies (aligned to CPRA) will be preconfigured, requiring only routine updates by IT staff.

2. Automation Hooks
o Workflows such as document approval or request routing will be deployed using Power Automate.
o These serve as templates that the City can expand for additional processes later.

3. AI & CoPilot Readiness
o Metadata and governance structures will be built with future AI in mind. o This ensures that when the City decides to license Microsoft CoPilot, the environment is ready for secure and productive use without redesign.

4. Roadmap Documentation
o As part of our closeout, we will provide a Future Roadmap document that outlines opportunities City IT can pursue post-project, such as:
§ Annual governance reviews (to be performed by City staff). § Scaling departmental workflows.
§ Expanding DLP policies or sensitivity labels.
§ Optional adoption of CoPilot or Power Platform tools.

5. Optional Ongoing Services (Attachment C Q13)
o While not required, we will outline optional managed service offerings should the City later choose additional support.

9.d
January 26, 2026 Packet Pg. 57
Proposal to serve City of San Carlos
Consultadd Inc. – Public Services Division
Proposal in Response to RFP for Legacy File Server Migration to SharePoint Modernization 42 o This will be framed as a menu of possibilities, not a contractual obligation.

Outcome for San Carlos

By the end of this one-time project, San Carlos will have:
• A fully modernized SharePoint/OneDrive environment with governance and compliance embedded.
• Clear documentation and training so City IT can manage and evolve the system. • Configurations designed to accommodate future automation and AI adoption without costly redesigns.
• The confidence that this investment will deliver value long after the project concludes.

9.d
January 26, 2026 Packet Pg. 58
Proposal to serve City of San Carlos
Consultadd Inc. – Public Services Division
Proposal in Response to RFP for Legacy File Server Migration to SharePoint Modernization 43

9. Project References – Relevant Experience & Proven
Outcomes
Consultadd Public Services (CAPS) brings a strong record of success delivering SharePoint, Microsoft 365, and data modernization projects for both government and enterprise clients. The following projects demonstrate our ability to execute large-scale migrations, design governance-driven SharePoint environments, and deliver measurable operational outcomes.

Client /
Agency
Project Overview Outcomes Achieved Contact
U.S. Small
Business
Administration
(SBA)
Migrated multi-terabyte
legacy data from onpremise environments
to Microsoft 365 and
Dynamics 365;
implemented secure file
access, retention
policies, and workflow
automation for federal
operations.

Enabled SBA to
manage millions of
case records
seamlessly, improving
data visibility and
operational scalability.

Estimated annual
savings: $25M through
automation and
reduced overhead.

Tejas Godbole
Tejas.Godbole
@sba.gov
(717) 539-4589
U.S.

Department of
Agriculture
(USDA)
Led data modernization
and migration of
inspection program
data to Microsoft 365;
developed SharePoint
sites for field inspection
teams with record
retention and audit
readiness.

Improved compliance
with USDA
recordkeeping
mandates; accelerated
data retrieval; and
reduced redundant
document storage by
40%.

Richa Mistry
Richa.Mistry@us
da.gov
(218) 297-8107
Perficient Partnered on enterprise
SharePoint migration
and hybrid cloud
architecture;
implemented
metadata-driven search
and governance
Delivered improved
data findability and
governance alignment
for enterprise clients;
ensured seamless
Milan Dholariya
Milan.Dholariya
@perficient.com
(254) 230-1082

9.d
January 26, 2026 Packet Pg. 59
Proposal to serve City of San Carlos
Consultadd Inc. – Public Services Division
Proposal in Response to RFP for Legacy File Server Migration to SharePoint Modernization 44 framework for large
data environments.
cross-system
integration.

Sam’s Club /
Walmart
Supported migration of
SharePoint and internal
collaboration systems
to Microsoft 365;
enhanced security,
compliance, and
document workflow
automation across
corporate departments.

Achieved faster
collaboration cycles,
better version control,
and reduced IT
maintenance costs by
35%.

Akash Kumar
Akash.Kumar@S
amsClub.com
(469) 643-4542
Relevance to San Carlos
Our projects mirror the City’s goals in scale and complexity governance-based SharePoint migration, user adoption, and compliance automation. The same methodologies and certified team members who led these projects will deliver San Carlos’s migration to ensure accuracy, security, and sustainable value.

9.d
January 26, 2026 Packet Pg. 60
Proposal to serve City of San Carlos
Consultadd Inc. – Public Services Division
Proposal in Response to RFP for Legacy File Server Migration to SharePoint Modernization 45 Appendix A – Financial Capacity and Required Forms

9.d
January 26, 2026 Packet Pg. 61
Proposal to serve City of San Carlos
Consultadd Inc. – Public Services Division
Proposal in Response to RFP for Legacy File Server Migration to SharePoint Modernization Financial Capacity Statement
Consultadd Inc. has attached the requested financial documentation. These records demonstrate our strong fiscal health, consistent growth, and capacity to successfully perform the full scope of work defined in this RFP.

Our company maintains a stable balance sheet, healthy liquidity ratios, and an established track record of managing multi-phase Microsoft 365 and SharePoint modernization engagements within similar scale and complexity. We are fully capable of executing this project responsibly and delivering outcomes that align with the City of San Carlos’s goals for modernization, governance, and long-term value.

9.d
January 26, 2026 Packet Pg. 62
Consultadd Inc
Balance Sheet
As of December 31, 2023
Accrual Basis Wednesday, October 30, 2024 10:41 AM GMT-04:00 1/3 TOTAL
ASSETS
Current Assets
Bank Accounts
1005 Paypal (Closed) 0.00
1040 Business Advantage Chk - 1624 (Closed) 0.00
1045 Business Advantage Chk - 1787 (Closed) 0.00
1050 Business Advantage Sav - 8839 (Closed) 0.00
1060 Cash at Citi Bank 1,835,776.04
1070 Consultadd *8752 Chase 611,272.17
CARES Act Loan (Closed) 0.00
Total Bank Accounts $2,447,048.21
Accounts Receivable
1200 Accounts Receivable 1,034,821.31
1201 Unmatched Deposits 0.00
Total 1200 Accounts Receivable 1,034,821.31
Total Accounts Receivable $1,034,821.31
Other Current Assets
1300 Undeposited Fund 0.00
1400 Prepaid Expenses 0.00
1410 Prepaid Payroll Taxes 0.00
1750 Advances to Employees -8,688.11
1751 Advances to Gusto - Salaries 0.00
1752 Advances to Gusto - Payroll Taxes 0.00
1800 Due from Related Parties
1801 Due from a Stockholder 98,750.00
1802 Due from August Ventures 0.00
1803 Due from Bharat Bhate 217,531.18
1804 Due from Boto3 0.00
1805 Due from ConsultADD India 0.00
1806 Due from Gokronos 664.00
1808 Due from Ioneq 0.00
1811 Due from Nzyme 0.00
1812 Due from OC10 0.00
1815 Due from Zioqu 0.00
1816 Due from Consultadd Canada 0.00
Total 1800 Due from Related Parties 316,945.18
1890 Investments in Cloudtech.com 310,000.00
1891 Investment in TechTrust 200,000.00
Transfers 0.00
Total Other Current Assets $818,257.07
Total Current Assets $4,300,126.59

9.d
January 26, 2026 Packet Pg. 63
Consultadd Inc
Balance Sheet
As of December 31, 2023
Accrual Basis Wednesday, October 30, 2024 10:41 AM GMT-04:00 2/3 TOTAL
Fixed Assets
1500 Equipment 32,121.02
1505 Accumulated Depreciation, Equipment -4,678.35
1510 Furniture 1,813.04
1515 Accumulated Depreciation, Furniture -1,813.04
Total Fixed Assets $27,442.67
Other Assets
1600 Deposits & Other Assets 0.00
1610 Security Deposit 57,735.32
1780 Loan to Employee 1,500.00
Total Other Assets $59,235.32
TOTAL ASSETS $4,386,804.58

LIABILITIES AND EQUITY
Liabilities
Current Liabilities
Accounts Payable
2200 Accounts Payable 0.00
Total Accounts Payable $0.00
Other Current Liabilities
2310 Accrued Payroll Tax 0.00
2320 Accrued Payroll 0.00
2400 Accrued Expenses 0.00
2510 Deferred Revenue 0.00
2600 Due to Related Parties
2601 Due to August Ventures 0.00
2602 Due to Bharat Bhate 0.00
2603 Due to Boto3 0.00
2604 Due to ConsultADD India 0.00
2605 Due to Gokronos 0.00
2606 Due to Induci 0.00
2607 Due to Ioneq 0.00
2608 Due to Log1 0.00
2609 Due to Netresolute 300,000.00
2610 Due to Nzyme 900,000.00
2611 Due to OC10 600,000.00
2612 Due to Okyte 0.00
2613 Due to Pythonwise 100,000.00
2614 Due to Zioqu 300,000.00
2615 Due to Datayog 0.00

9.d
January 26, 2026 Packet Pg. 64
Consultadd Inc
Balance Sheet
As of December 31, 2023
Accrual Basis Wednesday, October 30, 2024 10:41 AM GMT-04:00 3/3 TOTAL
Total 2600 Due to Related Parties 2,200,000.00
2650 Other Current Liabilities 0.00
2651 SBA PPP Loan 0.00
2652 Refundable Consultant Deposit 0.00
Total Other Current Liabilities $2,200,000.00
Total Current Liabilities $2,200,000.00
Total Liabilities $2,200,000.00
Equity
3100 Common Stock 3,000.00
3200 Preferred Stock 0.00
3500 Retained Earnings 1,294,343.15
Opening Balance Equity 0.00
Net Income 889,461.43
Total Equity $2,186,804.58
TOTAL LIABILITIES AND EQUITY $4,386,804.58

9.d
January 26, 2026 Packet Pg. 65
Consultadd Inc
Profit and Loss
January - December 2021
Accrual Basis Monday, June 17, 2024 04:06 PM GMT-04:00 1/2 TOTAL
Income
4010 Recurring Subscription 18,777,852.25
4050 Consultant Fee Collected 195,135.33
4055 Consultant Fee Refunded -14,608.00
4060 Training Fees 30,459.41
4500 Other Income
4503 Tax Refund 39,260.86
Total 4500 Other Income 39,260.86
Grant Income 2,096,475.00
Total Income $21,124,574.85
Cost of Goods Sold
5010 Consultant Salaries 13,373,400.27
5025 Consultant Training Fees 124,604.00
5030 Payment Processing Fee 349.67
5035 Immigration Fees 179,760.34
Total Cost of Goods Sold $13,678,114.28
GROSS PROFIT $7,446,460.57
Expenses
6100 Employee Compensation
6120 Employee Reimbursement 4,363.81
6150 Payroll Taxes 868,960.24
Total 6100 Employee Compensation 873,324.05
6200 Commissions/Bonuses
6220 Bonuses 21,250.00
6230 Referral Fees 2,700.00
Total 6200 Commissions/Bonuses 23,950.00
6250 Benefits
6255 Health 665,414.31
6270 Other Benefits 2,092.33
6275 Payroll Fees 11,301.66
Total 6250 Benefits 678,808.30
6300 Contracted Help
6310 Domestic 66,402.00
6320 International 28,320.00
Total 6300 Contracted Help 94,722.00
6350 Recruiting & Relocation
6355 Recruiting Fees 500.00
6365 Recruiting Advertising 500.00
6380 Recruiting Others 98.51
6385 Relocation Expense 3,500.00
Total 6350 Recruiting & Relocation 4,598.51

9.d
January 26, 2026 Packet Pg. 66
Consultadd Inc
Profit and Loss
January - December 2021
Accrual Basis Monday, June 17, 2024 04:06 PM GMT-04:00 2/2 TOTAL
6400 Travels & Meetings
6405 Airfare 622.00
6435 Travel Others 3,864.00
Total 6400 Travels & Meetings 4,486.00
6450 General Office Expenses
6454 Administrative Fees 3,234,030.68
6455 Bank Service Charges 353.71
6458 Business Insurance 49,929.67
6462 Company Events 350,000.00
6463 Gifts & Donations 1,350.00
6464 Education/Training 1,470.00
6465 Licenses, Fees & Permits 2,757.58
6470 Office Supplies 5,032.33
6473 Shipping & Delivery 4,948.89
6475 Web Services 8,658.81
Total 6450 General Office Expenses 3,658,531.67
6500 Professional Services
6510 Accounting Fees 24,060.00
6520 Legal Fees 73,602.42
6540 Other Professional Services 19,833.75
Total 6500 Professional Services 117,496.17
6550 Marketing
6560 Advertising 51,243.25
Total 6550 Marketing 51,243.25
6600 Computer & Equipment
6630 Software Purchase 9,077.12
Total 6600 Computer & Equipment 9,077.12
6653 Facilities
6660 Rent & Lease 487,135.07
6670 Repairs & Maintenance 5,500.25
6675 Telephone 1,667.15
6685 Office Meals 699.90
Total 6653 Facilities 495,002.37
6900 Taxes 813,365.01
7000 Non-operating Revenues And Expenses
7020 Interest Income -2,008.72
Total 7000 Non-operating Revenues And Expenses -2,008.72 Total Expenses $6,822,595.73
NET OPERATING INCOME $623,864.84
NET INCOME $623,864.84

9.d
January 26, 2026 Packet Pg. 67
Consultadd Inc
Profit and Loss
January - December 2022
Accrual Basis Monday, June 17, 2024 04:07 PM GMT-04:00 1/2 TOTAL
Income
4010 Recurring Subscription 15,301,071.87
4012 Web Development Services 36,222.51
4050 Consultant Fee Collected 102,134.00
4055 Consultant Fee Refunded -6,000.00
4060 Training Fees 104,966.16
4500 Other Income
4503 Tax Refund 295,562.39
4504 Other Income 4,500.00
4505 Payroll Tax Refund 8,680.89
Total 4500 Other Income 308,743.28
Total Income $15,847,137.82
Cost of Goods Sold
5010 Consultant Salaries 11,121,658.74
5025 Consultant Training Fees 28,500.00
5030 Payment Processing Fee 85,681.46
5035 Immigration Fees 182,857.14
Total Cost of Goods Sold $11,418,697.34
GROSS PROFIT $4,428,440.48
Expenses
6100 Employee Compensation
6150 Payroll Taxes 761,130.67
Total 6100 Employee Compensation 761,130.67
6200 Commissions/Bonuses
6220 Bonuses 73,669.30
Total 6200 Commissions/Bonuses 73,669.30
6250 Benefits
6255 Health 672,350.89
6270 Other Benefits 35,769.15
6275 Payroll Fees 15,600.55
6280 401(k) Expense 14,632.80
Total 6250 Benefits 738,353.39
6300 Contracted Help
6310 Domestic 92,126.00
6320 International 3,900.00
Total 6300 Contracted Help 96,026.00
6350 Recruiting & Relocation
6380 Recruiting Others 987.21
Total 6350 Recruiting & Relocation 987.21

9.d
January 26, 2026 Packet Pg. 68
Consultadd Inc
Profit and Loss
January - December 2022
Accrual Basis Monday, June 17, 2024 04:07 PM GMT-04:00 2/2 TOTAL
6400 Travels & Meetings
6410 Hotel & Lodging 31,271.09
6420 Meals 29.02
6425 Auto & Related 481.79
6435 Travel Others 413.38
Total 6400 Travels & Meetings 32,195.28
6450 General Office Expenses
6454 Administrative Fees 4,973,372.02
6455 Bank Service Charges 917.06
6458 Business Insurance 40,428.36
6463 Gifts & Donations 9,267.26
6464 Education/Training 350.00
6465 Licenses, Fees & Permits 7,263.08
6470 Office Supplies 17,260.39
6473 Shipping & Delivery 7,038.88
6475 Web Services 18,766.38
6477 Penalties and Fines 193.87
Total 6450 General Office Expenses 5,074,857.30
6500 Professional Services
6510 Accounting Fees 35,769.31
6520 Legal Fees 78,766.86
6540 Other Professional Services 418,877.35
Total 6500 Professional Services 533,413.52
6550 Marketing
6560 Advertising 41,164.64
Total 6550 Marketing 41,164.64
6653 Facilities
6660 Rent & Lease 27,207.77
6665 Utilities 1,854.35
6675 Telephone 108.34
6685 Office Meals 42.42
Total 6653 Facilities 29,212.88
6900 Taxes 38,370.59
7000 Non-operating Revenues And Expenses
7050 Extraordinary Items 0.00
Total 7000 Non-operating Revenues And Expenses 0.00
7400 QuickBooks Payments Fees 320.00
Total Expenses $7,419,700.78
NET OPERATING INCOME $ -2,991,260.30
NET INCOME $ -2,991,260.30

9.d
January 26, 2026 Packet Pg. 69
Consultadd Inc
Profit and Loss
January - December 2023
Accrual Basis Monday, June 17, 2024 04:07 PM GMT-04:00 1/3 TOTAL
Income
4000 Revenue 0.00
4010 Recurring Subscription 14,224,221.33
4012 Web Development Services 202,054.00
4050 Consultant Fee Collected 82,892.00
4055 Consultant Fee Refunded -191,851.00
4060 Training Fees 211,276.55
4070 Administrative Fee 532,000.00
4500 Other Income
4503 Tax Refund 957,095.77
4505 Payroll Tax Refund 3,239,726.63
Total 4500 Other Income 4,196,822.40
4600 Miscellaneous Income 30.28
Total Income $19,257,445.56
Cost of Goods Sold
5010 Consultant Salaries 9,917,623.25
5025 Consultant Training Fees 33,000.00
5030 Payment Processing Fee 94,707.68
5035 Immigration Fees 134,608.40
Total Cost of Goods Sold $10,179,939.33
GROSS PROFIT $9,077,506.23
Expenses
6100 Employee Compensation
6150 Payroll Taxes 1,205,457.34
Total 6100 Employee Compensation 1,205,457.34
6200 Commissions/Bonuses
6220 Bonuses 14,500.00
Total 6200 Commissions/Bonuses 14,500.00
6250 Benefits
6255 Health 578,308.54
6265 Worker's Compensation 75.69
6275 Payroll Fees 27,914.58
6280 401(k) Expense 60,358.58
Total 6250 Benefits 666,657.39
6300 Contracted Help
6310 Domestic 1,918.45
6320 International 2,610.00
Total 6300 Contracted Help 4,528.45

9.d
January 26, 2026 Packet Pg. 70
Consultadd Inc
Profit and Loss
January - December 2023
Accrual Basis Monday, June 17, 2024 04:07 PM GMT-04:00 2/3 TOTAL
6400 Travels & Meetings
6405 Airfare 11,463.72
6410 Hotel & Lodging 14,855.09
6415 Travel Entertainment 2,982.50
6420 Meals 1,845.82
6425 Auto & Related 1,515.98
6435 Travel Others 340.00
Total 6400 Travels & Meetings 33,003.11
6450 General Office Expenses
6454 Administrative Fees 5,839,134.00
6455 Bank Service Charges 618.23
6458 Business Insurance 77,019.09
6463 Gifts & Donations 3,485.00
6464 Education/Training 26,935.00
6465 Licenses, Fees & Permits 3,198.64
6470 Office Supplies 16,225.39
6473 Shipping & Delivery 15,155.50
6475 Web Services 56,364.32
6476 General Expenses 3,467.61
Total 6450 General Office Expenses 6,041,602.78
6500 Professional Services
6510 Accounting Fees 38,109.07
6520 Legal Fees 83,919.14
6540 Other Professional Services 3,449.00
Total 6500 Professional Services 125,477.21
6550 Marketing
6560 Advertising 20,932.33
6565 Events 3,362.51
Total 6550 Marketing 24,294.84
6600 Computer & Equipment
6610 Computer Equipment 3,757.24
6620 Computer Supplies 1,987.71
Total 6600 Computer & Equipment 5,744.95
6653 Facilities
6660 Rent & Lease 36,643.25
6665 Utilities 269.97
6675 Telephone 2,959.27
6680 Internet Connectivity 1,731.99
6690 Groceries 40.80
Total 6653 Facilities 41,645.28
6850 Bad Debt Expense 6,742.00
6900 Taxes 15,368.79

9.d
January 26, 2026 Packet Pg. 71
Consultadd Inc
Profit and Loss
January - December 2023
Accrual Basis Monday, June 17, 2024 04:07 PM GMT-04:00 3/3 TOTAL
7400 QuickBooks Payments Fees 606.66
Total Expenses $8,185,628.80
NET OPERATING INCOME $891,877.43
NET INCOME $891,877.43

9.d
January 26, 2026 Packet Pg. 72
City of San Carlos RFP: Legacy File Server Migration to SharePoint Modernization
Attachment A – RFP Checklist
Company Name
Company Address
Primary RFP Contact Name
Primary RFP Contact Number
Primary RFP Contact Email Address
Person Authorized to Execute the
Contract (if different from primary
RFP contact)
The following proposal submission requirements are included in this proposal:
x RFP Checklist (This Attachment)
x Vendor Qualifications
x Proposed Methodology and Related Information Including Completion of the Minimum Requirements List
x Proposed Cost of Project
x Service Agreement and Insurance Requirement Acknowledgement x California Levine Act Statement (Attachment B)
x Vendor Questionnaire (Attachment C)
Consultadd Inc. - Division of Public Services
HQ: 175 Greenwich St, 38th Floor,New york, NY -10007
Regional office: 2445 Augustine Dr Suites 150 and 201, Santa Clara, CA 95054 Bharat Bhate - Founder and President
888-771-9958
Bharat Bhate
[email protected]

9.d
January 26, 2026 Packet Pg. 73
California Levine Act Statement
Attachment B
California Government Code Section 84308, commonly referred to as the "Levine Act," prohibits any San Carlos City Council Member from participating in any action related to a contract or application if they receive any political contributions from the business or applicant totaling more than $250 within the previous twelve months, and for twelve months following the date of a ĮŶĂůdecision.

The Levine Act also requires a member of the San Carlos City Council who has received such a contribution to disclose the contribution on the record of the proceeding.

Current San Carlos City Council Members are listed at: www.cityofsancarlos.org/CityCouncil. Proposers are responsible for accessing this link to review the names prior to answering the following questions:

1. Have you or your company, or any agent on behalf of you or your company, made any political contributions of more than $250 to any San Carlos City Council Member in the 12 months preceding the date of the submission of your proposal or application, or the anticipated date of any Council action?
Yes. List Council Member(s):

No
2 Do you or your company, or any agency on behalf of you or your company, anticipate or plan to make any political contribution of more than $250 to any San Carlos City Council Member in the 12 months following any Council action related to your proposal or application? Yes. List Council Member(s):

No
Answering yes to either of the two questions above does not preclude the San Carlos City Council from awarding a contract or approving an application or any subsequent action. It does however, preclude the ŝĚĞŶƚŝĮĞĚŽƵŶĐŝůDĞŵďĞƌ;ƐͿĨƌŽŵƉĂƌƚŝĐŝƉĂƚŝŶŐŝŶĂŶLJĂĐƚŝŽŶƐƌĞůĂƚĞĚƚŽLJŽƵƌƉƌŽƉŽƐĂůŽƌĂƉƉůŝĐĂƚŝŽŶ͘ Date Signature of authorized individual
Company/Applicant Name
10/02/2025
Consultadd Inc.

9.d
January 26, 2026 Packet Pg. 74

ATTACHMENT C
Question # Question Vendor Response City Comments
Q1 Describe your experience migrating legacy file servers to OneDrive and SharePoint Online.

Q2
Describe how NTFS/AD permissions and file ownership will be mapped to SharePoint/OneDrive (including nested groups and orphaned SIDs).

Q3 What is your approach to identifying and managing
redundant, outdated, or trivial (ROT) data?
Q4 Describe your information architecture approach (site/library structure, navigation).

Q5 How will you coordinate with City staff and departments for file clean-up and migration validation?
Q6 How do you ensure data security and compliance with
California public records laws during migration?
Q7 Provide a sample timeline for a migration project of this size.

Q8
Provide a UAT plan (test scripts, roles, exit criteria, defect thresholds, sign-off process) and success metrics for go-live.

Q9 Detail your risk and rollback strategy (data loss, throttling, long paths/illegal characters, locked files, cutover go/no-go).

Q10 Describe your post-go-live stabilization/warranty support for the first 60–90 days (scope, SLAs, response/resolution targets).

Q11 Provide three references for similar completed projects, including contact information.

Q12 What Microsoft certifications or partnerships does your firm hold?
Q13 Describe optional ongoing managed services after the warranty period (scope, SLAs, staffing model, monthly pricing).

Q14 Do you use contractors/sub-contractors for projects? Q15 Describe your approach to Microsoft Purview (retention labels/policies, DLP, sensitivity labels) for City content.

Q16 What is your default external sharing and guest access stance for SharePoint/OneDrive, and how will you enforce it?
Q17 Outline your backup/restore and eDiscovery approach postmigration (RTO/RPO assumptions).

Q18
Summarize your Copilot readiness and configuration plan (licensing assumptions, privacy/telemetry posture, connectors you recommend, data access guardrails).

Q19 Provide two examples of Copilot use cases you will pilot for the City and how you will measure value.

Q20 Provide your plan for reconciliation reporting (file/folder/byte counts, ACL parity) and success thresholds for acceptance.

Q21
How will you treat large/complex content types (e.g., PST archives, CAD/GIS files, databases, ZIPs) and maintain link integrity?
p. 20 - 24
p. 7 - 8
p. 17 - 19
p. 16 - 17
p. 18 - 19 & 28 - 30
p. 25-27
p. 35 - 36
p. 28 - 30
p. 39 - 41
p. 35 - 36
p. 43-45
p. 9-10
p. 38 - 39 & 41 - 42
p. 10-11
p. 24 - 25
p. 24
p. 25 - 27
p. 41 - 42
p. 41 - 42
p. 34-35
p. 17-18

9.d
January 26, 2026 Packet Pg. 75

ATTACHMENT C
Q22 Propose a site provisioning and lifecycle process (request → approval → creation → archival) to control sprawl.

Q23
Describe your approach to metadata/taxonomy design for
department sites (who decides, how you document, how you train).

Q24 Provide a sample risk register (top 5 risks for this project and mitigations).

Q25
Provide a training plan (end users, site owners, admins), estimated sessions, and train-the-trainer approach, with deliverables you will leave behind.

Q26
List key personnel (roles, % allocation, location), tools you use for status/risk tracking, and your communication cadence with the City.

Q27 State assumptions and required City resources (by role and estimated hours).

Q28
List all tools/platforms to be used for file assessment and migration (e.g., discovery, pre-checks, migration engine, reporting).

Q29 Who provides/pays for licenses? Include unit costs and expected quantity.

Q30 Confirm preservation of timestamps (Created/Modified), authorship, version history (if applicable), and any limitations.

Q31 What pre/post reports are produced (file/folder/byte counts, ACL parity)? Provide example templates.
p. 20-22
p. 23-24
p. 39 - 40
p. 34 - 35
p. 8-11
p. 34 - 35
p. 30 - 32
p. 32
p. 18 - 19
p. 34 - 35

9.d
January 26, 2026 Packet Pg. 76
Thank you for considering
our proposal
175 Greenwich Street, 38th Floor, New
York, NY, 10007

2445 Augustine Dr Suites 150 and 201,
Santa Clara, CA 95054
Contact No.

+1 888 771 9958
Email Address

[email protected]
Address

9.d
January 26, 2026 Packet Pg. 77

CITY COUNCIL

STAFF REPORT
MEETING DATE: January 26, 2026
ITEM TITLE: Adopt a Resolution Accepting the Gift of Funds from The Fisher Family Trust in a Combined Amount of $70,000 for the San Carlos Adult Community Center and Youth Center.

RECOMMENDATION:

Staff recommend that the City Council adopt a Resolution accepting the gift of funds from the Fisher Family Trust in the combined amount of $70,000 for the San Carlos Adult Community Center and Youth Center.

FISCAL IMPLICATIONS:

There are no fiscal implications, and no additional funding is needed.

The funds will be placed in a restricted fund to be used for facility and program improvements at the Adult Community Center and Youth Center. Through the budget process, staff will bring forth options on how the funds can be spent. The City Council will need to allocate the funds for use for a particular program or project.

BACKGROUND:

On July 23, 2025, the City was notified by an attorney that the City of San Carlos Adult Community Center and Youth Center were recipients of a gift of funds from the Fisher Family Trust. The Adult Community Center received $50,000, while the Youth Center received $20,000.

ANALYSIS:

California Government Code section 37354 outlines the authority of a city’s legislative body regarding gifts made to the city. The City Council, as the legislative body, has the power to decide whether to accept or reject any gift offered to the City.

During the budget process, staff will propose a project, or projects, for the City Council to consider funding with this donation. At the time, Council will allocate the donated funds to a specified project for improvements to the Adult Community Center and Youth Center. There is no time restriction on when the funds need to be used.

ALTERNATIVES:

The alternatives available to the City Council include:

9.e
January 26, 2026 Packet Pg. 78

1. Adopt a Resolution accepting the gift of funds from The Fisher Family Trust in a combined amount of $70,000 for the San Carlos Adult Community Center and Youth Center; or

2. Do not adopt a Resolution; or

3. Provide staff with alternative direction.

Respectfully submitted by:

Amy Newby, Parks & Recreation Director
Approved for submission by:
____________________________
Nil Blackburn, Interim City Manager
ATTACHMENT(S):

1. Resolution

9.e
January 26, 2026 Packet Pg. 79
RESOLUTION NO. 2026 – ____

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SAN CARLOS

ACCEPTING THE GIFT OF FUNDS FROM THE FISHER FAMILY TRUST IN A COMBINED AMOUNT OF $70,000 FOR THE SAN CARLOS ADULT COMMUNITY CENTER AND YOUTH CENTER.

WHEREAS, the City was notified on July 23, 2025 that the San Carlos Adult Community Center and Youth Center were recipients of a gift of funds from the Fisher Family Trust; and WHEREAS, the Adult Community Center has been gifted a total of $50,000 from the estate and the Youth Center has been gifted a total of $20,000; and WHEREAS, California Government Code section 37354 outlines the authority of a city’s legislative body regarding gifts made to the city; and
WHEREAS, the City Council has the power to decide whether to accept or reject any gift offered to the City; and
WHEREAS, the funds will be placed in a restricted fund to be used for facility and program improvements at the Adult Community Center and Youth Center; and WHEREAS, the acceptance of the gift of the funds will be followed by project and program proposals for City Council to consider and approve during the budget process; and NOW, THEREFORE BE IT RESOLVED, that the San Carlos City Council hereby accepts the Gift of Funds from the Fisher Family Trust in the amount of $70,000 for the San Carlos Adult Community Center and Youth Center.
* * * * *
I, City Clerk Crystal Mui, hereby certify that the foregoing Resolution was duly and regularly passed and adopted by the City Council of the City of San Carlos at a scheduled meeting thereof held on the 26th day of January 2026, by the following vote:
________________________________
CITY CLERK of the City of San Carlos
APPROVED:
___________________________
MAYOR of the City of San Carlos
AYES, COUNCILMEMBERS:

NOES, COUNCILMEMBERS:

ABSENT, COUNCILMEMBERS:

9.e
January 26, 2026 Packet Pg. 80

CITY COUNCIL

STAFF REPORT
MEETING DATE: January 26, 2026
ITEM TITLE: Adopt a Resolution Approving the Plans and Specifications for the Upgrade of Existing Tennis and Basketball Court Lighting at Burton and Highlands Parks Project (C2102) and Authorizing a Call for Bids.

RECOMMENDATION:

Staff recommend that the City Council adopt a Resolution approving the plans and specifications for the upgrade of existing tennis and basketball court lighting at Burton and Highlands Parks (C2102) (“Project”) and authorizing a call for bids.

FISCAL IMPLICATIONS:

There are no fiscal impacts, and no additional funding is needed.

Funding for the Project is currently budgeted for fiscal year (FY) 2025-26 and has a remaining balance of approximately $293,992.50. The engineer’s estimate, including a 10% project contingency, is approximately $355,000. If bids received are greater than the funds available, staff will request additional appropriation of funds at the time of contract award.

BACKGROUND:

The City operates the tennis and basketball courts at Burton Park and the tennis and pickleball courts at Highlands Park, which are currently equipped with outdated halogen lighting systems.

At Highlands Park, the tennis and pickleball courts also rely on parking lot lighting for night play, which does not provide adequate illumination for the intended recreational use.

As part of the City’s ongoing efforts to modernize park facilities, staff propose replacement of the existing outdoor court lighting with a new LED lighting system designed to support safe and effective nighttime play.

The City has recently completed other LED lighting upgrades for facilities and sports fields at both Burton and Highlands Parks. Replacing the outdoor court lighting would continue this effort and is consistent with recommendations outlined in the Zero Energy Feasibility Report and the Parks Master Plan.

Staff retained Salas O’Brien (“Consultant”) through an existing on-call services contract to provide engineering services and prepare the construction documents.

9.f
January 26, 2026 Packet Pg. 81
ANALYSIS:

The final bid set construction documents were signed by the City Engineer on January 13, 2026.

The tentative bid opening date is February 17, 2026, at 10:00 a.m., with the Project tentatively scheduled to be awarded at the March 9, 2026 City Council meeting.

Staff recommend approving the plans and specifications and authorizing a call for bids for the Project.

ALTERNATIVES:

The alternatives available to the City Council include:

1. Adopt a Resolution approving the plans and specifications for the upgrade of existing tennis and basketball court lighting at Burton and Highlands Parks (C2102) and authorizing a call for bids; or

2. Do not adopt the Resolution; or

3. Provide staff with alternative direction.

Respectfully submitted by:

Steven Machida, Public Works Director
Approved for submission by:
____________________________
Nil Blackburn, Interim City Manager
ATTACHMENT(S):

1. Resolution

2. Project C2102 Plans and Specifications

9.f
January 26, 2026 Packet Pg. 82
RESOLUTION NO. 2026 – ____

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SAN CARLOS

APPROVING THE PLANS AND SPECIFICATIONS FOR THE UPGRADE OF EXISTING

TENNIS AND BASKETBALL COURT LIGHTING AT BURTON AND HIGHLANDS PARKS PROJECT (C2102) AND AUTHORIZING A CALL FOR BIDS.

WHEREAS, the City operates the tennis and basketball courts at Burton Park and the tennis and pickleball courts at Highlands Park, which are currently equipped with outdated halogen lighting systems; and
WHEREAS, at Highlands Park, the tennis and pickleball courts also rely on parking lot lighting for night play, which does not provide adequate illumination for the intended recreational use; and
WHEREAS, the upgrade of existing tennis and basketball court lighting basketball court lighting at Burton and Highlands Parks C2102 (“Project”) will replace existing court lighting with new LED lighting systems designed to support safe and effective nighttime play; and WHEREAS, replacing the outdoor court lighting is consistent with the City’s ongoing efforts to modernize park facilities and with recommendations outlined in the Zero Energy Feasibility Report and the Parks Master Plan; and
WHEREAS, staff retained Salas O’Brien to provide engineering services and prepare the construction documents; and
WHEREAS, the final bid set construction documents were signed by the City Engineer on January 13, 2026; and
WHEREAS, the tentative bid opening date is February 17, 2026, at 10:00 a.m. with the Project tentatively scheduled to be awarded at the March 9, 2026 City Council meeting; and WHEREAS, staff recommend approving the plans and specifications and authorizing a call for bids for the Project.

NOW, THEREFORE BE IT RESOLVED, that the San Carlos City Council hereby approves the Upgrade of Existing Tennis and Basketball Court Lighting at Burton and Highlands Parks Project (C2102) Plans and Specifications and authorizes a call for bids. * * * * *
I, City Clerk Crystal Mui, hereby certify that the foregoing Resolution was duly and regularly passed and adopted by the City Council of the City of San Carlos at a scheduled meeting thereof held on the 26th day of January 2026, by the following vote:

9.f
January 26, 2026 Packet Pg. 83
________________________________
CITY CLERK of the City of San Carlos
APPROVED:
___________________________
MAYOR of the City of San Carlos
AYES, COUNCILMEMBERS:

NOES, COUNCILMEMBERS:

ABSENT, COUNCILMEMBERS:

9.f
January 26, 2026 Packet Pg. 84

CONSTRUCTION PHOTOGRAPHS

DEPARTMENT OF PUBLIC WORKS
SAN CARLOS, CALIFORNIA C2102 - UPGRADE OF EXISTING TENNIS AND BASKETBALL COURT LIGHTING AT BURTON AND HIGHLANDS PARK PROJ. MGR.: AMY NEWBY
CHECKED BY: HUGH KING
DRAWN BY: SALAS O'BRIEN
PROJECT ID: C2102
01/08/2026
STEVEN J. MACHIDA

DIRECTOR OF PUBLIC WORKS
Hz SCALE: AS NOTED
Vt SCALE: AS NOTED
Drawing No.

The City of Good
Living

CI TY OF SAN CARLOS

CA L I FOR N I A
BURTON: 900 CHESTNUT ST, SAN CARLOS, CA 94070
HIGHLANDS: 2600 MELENDY DR, SAN CARLOS, CA 94070
Sheet of 13
expect a difference
305 South 11th Street
San Jose, California 95112-2218
408.282.1500 | 408.297.2995 (f)
salasobrien.com
California | Georgia | Louisiana
Montana | Texas | Washington

UPGRADE OF EXISTING TENNIS AND BASKETBALL COURT LIGHTING AT

BURTON AND HIGHLANDS PARK
G-0.0
The City of Good
Living

CI TY OF SAN CARLOS

CA L I FOR N I A

UPGRADE OF EXISTING TENNIS AND BASKETBALL COURT LIGHTING AT BURTON AND HIGHLANDS PARK BURTON: 900 CHESTNUT ST, SAN CARLOS, CA 94070
HIGHLANDS: 2600 MELENDY DR, SAN CARLOS, CA 94070
1 COVER SHEET

9.f
January 26, 2026 Packet Pg. 85
“ ”

DEPARTMENT OF PUBLIC WORKS
SAN CARLOS, CALIFORNIA C2102 - UPGRADE OF EXISTING TENNIS AND BASKETBALL COURT LIGHTING AT BURTON AND HIGHLANDS PARK PROJ. MGR.: AMY NEWBY
CHECKED BY: HUGH KING
DRAWN BY: SALAS O'BRIEN
PROJECT ID: C2102
01/08/2026
STEVEN J. MACHIDA

DIRECTOR OF PUBLIC WORKS
Hz SCALE: AS NOTED
Vt SCALE: AS NOTED
Drawing No.

The City of Good
Living

CI TY OF SAN CARLOS

CA L I FOR N I A
BURTON: 900 CHESTNUT ST, SAN CARLOS, CA 94070
HIGHLANDS: 2600 MELENDY DR, SAN CARLOS, CA 94070
Sheet of 13
expect a difference
305 South 11th Street
San Jose, California 95112-2218
408.282.1500 | 408.297.2995 (f)
salasobrien.com
California | Georgia | Louisiana
Montana | Texas | Washington

UPGRADE OF EXISTING TENNIS AND BASKETBALL COURT LIGHTING AT

BURTON AND HIGHLANDS PARK
E-0.1 ELECTRICAL GENERAL NOTES
2 9.f
January 26, 2026 Packet Pg. 86
’
’

DEPARTMENT OF PUBLIC WORKS
SAN CARLOS, CALIFORNIA C2102 - UPGRADE OF EXISTING TENNIS AND BASKETBALL COURT LIGHTING AT BURTON AND HIGHLANDS PARK PROJ. MGR.: AMY NEWBY
CHECKED BY: HUGH KING
DRAWN BY: SALAS O'BRIEN
PROJECT ID: C2102
01/08/2026
STEVEN J. MACHIDA

DIRECTOR OF PUBLIC WORKS
Hz SCALE: AS NOTED
Vt SCALE: AS NOTED
Drawing No.

The City of Good
Living

CI TY OF SAN CARLOS

CA L I FOR N I A
BURTON: 900 CHESTNUT ST, SAN CARLOS, CA 94070
HIGHLANDS: 2600 MELENDY DR, SAN CARLOS, CA 94070
Sheet of 13
expect a difference
305 South 11th Street
San Jose, California 95112-2218
408.282.1500 | 408.297.2995 (f)
salasobrien.com
California | Georgia | Louisiana
Montana | Texas | Washington

UPGRADE OF EXISTING TENNIS AND BASKETBALL COURT LIGHTING AT

BURTON AND HIGHLANDS PARK
ELECTRICAL SCHEDULES, SEQUENCES, SYMBOLS AND ABBREVIATIONS E-0.2 3 9.f
January 26, 2026 Packet Pg. 87

DEPARTMENT OF PUBLIC WORKS
SAN CARLOS, CALIFORNIA C2102 - UPGRADE OF EXISTING TENNIS AND BASKETBALL COURT LIGHTING AT BURTON AND HIGHLANDS PARK PROJ. MGR.: AMY NEWBY
CHECKED BY: HUGH KING
DRAWN BY: SALAS O'BRIEN
PROJECT ID: C2102
01/08/2026
STEVEN J. MACHIDA

DIRECTOR OF PUBLIC WORKS
Hz SCALE: AS NOTED
Vt SCALE: AS NOTED
Drawing No.

The City of Good
Living

CI TY OF SAN CARLOS

CA L I FOR N I A
BURTON: 900 CHESTNUT ST, SAN CARLOS, CA 94070
HIGHLANDS: 2600 MELENDY DR, SAN CARLOS, CA 94070
Sheet of 13
expect a difference
305 South 11th Street
San Jose, California 95112-2218
408.282.1500 | 408.297.2995 (f)
salasobrien.com
California | Georgia | Louisiana
Montana | Texas | Washington

UPGRADE OF EXISTING TENNIS AND BASKETBALL COURT LIGHTING AT

BURTON AND HIGHLANDS PARK
ED-1.1 ELECTRICAL BURTON PARTIAL SITE PLAN - DEMO

AREA OF WORK
(TENNIS/BASKETBALL

COURTS)
4 9.f
January 26, 2026 Packet Pg. 88

DEPARTMENT OF PUBLIC WORKS
SAN CARLOS, CALIFORNIA C2102 - UPGRADE OF EXISTING TENNIS AND BASKETBALL COURT LIGHTING AT BURTON AND HIGHLANDS PARK PROJ. MGR.: AMY NEWBY
CHECKED BY: HUGH KING
DRAWN BY: SALAS O'BRIEN
PROJECT ID: C2102
01/08/2026
STEVEN J. MACHIDA

DIRECTOR OF PUBLIC WORKS
Hz SCALE: AS NOTED
Vt SCALE: AS NOTED
Drawing No.

The City of Good
Living

CI TY OF SAN CARLOS

CA L I FOR N I A
BURTON: 900 CHESTNUT ST, SAN CARLOS, CA 94070
HIGHLANDS: 2600 MELENDY DR, SAN CARLOS, CA 94070
Sheet of 13
expect a difference
305 South 11th Street
San Jose, California 95112-2218
408.282.1500 | 408.297.2995 (f)
salasobrien.com
California | Georgia | Louisiana
Montana | Texas | Washington

UPGRADE OF EXISTING TENNIS AND BASKETBALL COURT LIGHTING AT

BURTON AND HIGHLANDS PARK
E-1.1 ELECTRICAL BURTON PARTIAL SITE PLAN - NEW

AREA OF WORK
(TENNIS/BASKETBALL

COURTS)
5 9.f
January 26, 2026 Packet Pg. 89

DEPARTMENT OF PUBLIC WORKS
SAN CARLOS, CALIFORNIA C2102 - UPGRADE OF EXISTING TENNIS AND BASKETBALL COURT LIGHTING AT BURTON AND HIGHLANDS PARK PROJ. MGR.: AMY NEWBY
CHECKED BY: HUGH KING
DRAWN BY: SALAS O'BRIEN
PROJECT ID: C2102
01/08/2026
STEVEN J. MACHIDA

DIRECTOR OF PUBLIC WORKS
Hz SCALE: AS NOTED
Vt SCALE: AS NOTED
Drawing No.

The City of Good
Living

CI TY OF SAN CARLOS

CA L I FOR N I A
BURTON: 900 CHESTNUT ST, SAN CARLOS, CA 94070
HIGHLANDS: 2600 MELENDY DR, SAN CARLOS, CA 94070
Sheet of 13
expect a difference
305 South 11th Street
San Jose, California 95112-2218
408.282.1500 | 408.297.2995 (f)
salasobrien.com
California | Georgia | Louisiana
Montana | Texas | Washington

UPGRADE OF EXISTING TENNIS AND BASKETBALL COURT LIGHTING AT

BURTON AND HIGHLANDS PARK
ED-1.2

AREA OF WORK
(TENNIS COURT)

ELECTRICAL HIGHLANDS PARTIAL SITE PLAN - DEMO
6 9.f
January 26, 2026 Packet Pg. 90

DEPARTMENT OF PUBLIC WORKS
SAN CARLOS, CALIFORNIA C2102 - UPGRADE OF EXISTING TENNIS AND BASKETBALL COURT LIGHTING AT BURTON AND HIGHLANDS PARK PROJ. MGR.: AMY NEWBY
CHECKED BY: HUGH KING
DRAWN BY: SALAS O'BRIEN
PROJECT ID: C2102
01/08/2026
STEVEN J. MACHIDA

DIRECTOR OF PUBLIC WORKS
Hz SCALE: AS NOTED
Vt SCALE: AS NOTED
Drawing No.

The City of Good
Living

CI TY OF SAN CARLOS

CA L I FOR N I A
BURTON: 900 CHESTNUT ST, SAN CARLOS, CA 94070
HIGHLANDS: 2600 MELENDY DR, SAN CARLOS, CA 94070
Sheet of 13
expect a difference
305 South 11th Street
San Jose, California 95112-2218
408.282.1500 | 408.297.2995 (f)
salasobrien.com
California | Georgia | Louisiana
Montana | Texas | Washington

UPGRADE OF EXISTING TENNIS AND BASKETBALL COURT LIGHTING AT

BURTON AND HIGHLANDS PARK
E-1.2

AREA OF WORK
(TENNIS COURT)

ELECTRICAL HIGHLANDS PARTIAL SITE PLAN - NEW
7 9.f
January 26, 2026 Packet Pg. 91

DEPARTMENT OF PUBLIC WORKS
SAN CARLOS, CALIFORNIA C2102 - UPGRADE OF EXISTING TENNIS AND BASKETBALL COURT LIGHTING AT BURTON AND HIGHLANDS PARK PROJ. MGR.: AMY NEWBY
CHECKED BY: HUGH KING
DRAWN BY: SALAS O'BRIEN
PROJECT ID: C2102
01/08/2026
STEVEN J. MACHIDA

DIRECTOR OF PUBLIC WORKS
Hz SCALE: AS NOTED
Vt SCALE: AS NOTED
Drawing No.

The City of Good
Living

CI TY OF SAN CARLOS

CA L I FOR N I A
BURTON: 900 CHESTNUT ST, SAN CARLOS, CA 94070
HIGHLANDS: 2600 MELENDY DR, SAN CARLOS, CA 94070
Sheet of 13
expect a difference
305 South 11th Street
San Jose, California 95112-2218
408.282.1500 | 408.297.2995 (f)
salasobrien.com
California | Georgia | Louisiana
Montana | Texas | Washington

UPGRADE OF EXISTING TENNIS AND BASKETBALL COURT LIGHTING AT

BURTON AND HIGHLANDS PARK
ELECTRICAL BURTON PARTIAL SITE PLAN - PHOTOMETRICS E-1.3

AREA OF WORK
(TENNIS/BASKETBALL

COURTS)
8 9.f
January 26, 2026 Packet Pg. 92

DEPARTMENT OF PUBLIC WORKS
SAN CARLOS, CALIFORNIA C2102 - UPGRADE OF EXISTING TENNIS AND BASKETBALL COURT LIGHTING AT BURTON AND HIGHLANDS PARK PROJ. MGR.: AMY NEWBY
CHECKED BY: HUGH KING
DRAWN BY: SALAS O'BRIEN
PROJECT ID: C2102
01/08/2026
STEVEN J. MACHIDA

DIRECTOR OF PUBLIC WORKS
Hz SCALE: AS NOTED
Vt SCALE: AS NOTED
Drawing No.

The City of Good
Living

CI TY OF SAN CARLOS

CA L I FOR N I A
BURTON: 900 CHESTNUT ST, SAN CARLOS, CA 94070
HIGHLANDS: 2600 MELENDY DR, SAN CARLOS, CA 94070
Sheet of 13
expect a difference
305 South 11th Street
San Jose, California 95112-2218
408.282.1500 | 408.297.2995 (f)
salasobrien.com
California | Georgia | Louisiana
Montana | Texas | Washington

UPGRADE OF EXISTING TENNIS AND BASKETBALL COURT LIGHTING AT

BURTON AND HIGHLANDS PARK
ELECTRICAL BURTON PARTIAL SITE PLAN - BID ALTERNATE #1 - PHOTOMETRICS E-1.3A

AREA OF WORK
(TENNIS/BASKETBALL

COURTS)
9 9.f
January 26, 2026 Packet Pg. 93
222222232324232225
252525252627282626
272727282929302828
303030303131303031
323232333334333234
323233343636363435
323233343537363435
323232333536353434
323233343537363435
323233343636363435
323232333334333234
303030303131303031
272727282929302828
252525252627282626
222222232324232225
302525252524232222
332930292826252525
363131303029282727
393331313231313030
433633343534333232
453837373735343332
463937373735343232
443936363635333232
463937373735343232
453837373735343332
433633343534333232
393331313231313030
363131303029282727
342930292827252525
302525252524232222
121924252320181820
193138383429242224
253844443933282426
293843423934292628
343840393633292730
374040373431293031
363939373330293030
364039373330292929
363939373330293030
363939373431293031
333839383632292730
293742423833292628
253744443933282426
193138383429242224
121925262421191820
222323242525252428
252526272830302929
282828293133333233
303031323435353436
323233343638383640
323233353840413841
323233353841413942
323233353840413940
323233353841413841
323233353840403740
313233343536363437
303031313233323133
272728283031302829
242525252627252526
222222232222212124
252221222323232223
282526272726252525
312829313029282828
353132333232313030
393436363534333232
423740403835343232
433740413835343232
423740413835333232
433740413835333232
413639393835333232
393435363533323231
343031323231303030
302729302928272727
272425262625252424
252121212222222222
22 22 22 23 23 24232225
25252525 26272826 26
27272728292930 2828
303030303131 30 30 31
323232333334 3332 34
3232333436363634 35
323233343537363435
323232333536353434
323233343537363435
323233343636363435
323232333334333234
303030303131303031
27 27272829 29302828
2525 25 25 26 27282626
22 22 22 23 23 2423 2225
302525252524232222
332930292826252525
36 3131303029282727
3933 31 313231313030
43363334 35 34333232
45383737 37 353433 32
46393737373534 32 32
4439363636353332 32
463937373735343232
453837373735343332
43 36 33343534333232
3933 31313231313030
3631 31 30 3029 282727
3429302928 2725 25 25
302525252524 23 2222
121924252320181820
19 3138383429242224
2538 44 4439 33282426
29384342 393429 2628
343840393633 29 2730
3740403734312930 31
363939373330293030
36 4039373330292929
3639 39373330293030
36393937 3431293031
33383938363229 2730
293742423833292628
2537444439332824 26
193138383429242224
1219 25 262421191820
22 23 23242525252428
25252627 28 30302929
2828282931 33 33 3233
3030313234353534 36
323233343638383640
323233353840413841
32 32 33 35 3841413942
32323335 38 40413940
323233353841 41 3841
32323335384040 37 40
313233343536363437
30 3031313233323133
27 27 28 28 3031302829
242525252627252526
2222222322 22 21 21 24
2522 21 22 23 23232223
28252627 27 26 25 25 25
31282931302928 28 28
353132333232313030
39 3436363534333232
4237 40403835343232
4337 40 41 3835343232
42374041 3835 33 3232
4337404138353332 32
413639393835333232
39 3435363533323231
34 30 31 323231303030
3027 2930 29 28272727
272425262625 25 2424
252121212222 22 22 22

DEPARTMENT OF PUBLIC WORKS
SAN CARLOS, CALIFORNIA C2102 - UPGRADE OF EXISTING TENNIS AND BASKETBALL COURT LIGHTING AT BURTON AND HIGHLANDS PARK PROJ. MGR.: AMY NEWBY
CHECKED BY: HUGH KING
DRAWN BY: SALAS O'BRIEN
PROJECT ID: C2102
01/08/2026
STEVEN J. MACHIDA

DIRECTOR OF PUBLIC WORKS
Hz SCALE: AS NOTED
Vt SCALE: AS NOTED
Drawing No.

The City of Good
Living

CI TY OF SAN CARLOS CA L I FOR N I A
BURTON: 900 CHESTNUT ST, SAN CARLOS, CA 94070
HIGHLANDS: 2600 MELENDY DR, SAN CARLOS, CA 94070
Sheet of 13
expect a difference
305 South 11th Street
San Jose, California 95112-2218
408.282.1500 | 408.297.2995 (f)
salasobrien.com
California | Georgia | Louisiana
Montana | Texas | Washington

UPGRADE OF EXISTING TENNIS AND BASKETBALL COURT LIGHTING AT

BURTON AND HIGHLANDS PARK
E-1.4

AREA OF WORK
(TENNIS COURT)

ELECTRICAL HIGHLANDS PARTIAL SITE PLAN - PHOTOMETRICS
10 9.f
January 26, 2026 Packet Pg. 94
Ground lug
Control
transformer
Intelligent Lighting Controls, Inc. R40-1 Relays
Input module for switches
NEMA-1 Enclosure
(Option for
NEMA-4)
Back plate
assembly with
electronics and R40
relays installed

DEPARTMENT OF PUBLIC WORKS
SAN CARLOS, CALIFORNIA C2102 - UPGRADE OF EXISTING TENNIS AND BASKETBALL COURT LIGHTING AT BURTON AND HIGHLANDS PARK PROJ. MGR.: AMY NEWBY
CHECKED BY: HUGH KING
DRAWN BY: SALAS O'BRIEN
PROJECT ID: C2102
01/08/2026
STEVEN J. MACHIDA

DIRECTOR OF PUBLIC WORKS
Hz SCALE: AS NOTED
Vt SCALE: AS NOTED
Drawing No.

The City of Good
Living

CI TY OF SAN CARLOS

CA L I FOR N I A
BURTON: 900 CHESTNUT ST, SAN CARLOS, CA 94070
HIGHLANDS: 2600 MELENDY DR, SAN CARLOS, CA 94070
Sheet of 13
expect a difference
305 South 11th Street
San Jose, California 95112-2218
408.282.1500 | 408.297.2995 (f)
salasobrien.com
California | Georgia | Louisiana
Montana | Texas | Washington

UPGRADE OF EXISTING TENNIS AND BASKETBALL COURT LIGHTING AT

BURTON AND HIGHLANDS PARK
E-5.1 ELECTRICAL DETAILS
11 9.f
January 26, 2026 Packet Pg. 95

DEPARTMENT OF PUBLIC WORKS
SAN CARLOS, CALIFORNIA C2102 - UPGRADE OF EXISTING TENNIS AND BASKETBALL COURT LIGHTING AT BURTON AND HIGHLANDS PARK PROJ. MGR.: AMY NEWBY
CHECKED BY: HUGH KING
DRAWN BY: SALAS O'BRIEN
PROJECT ID: C2102
01/08/2026
STEVEN J. MACHIDA

DIRECTOR OF PUBLIC WORKS
Hz SCALE: AS NOTED
Vt SCALE: AS NOTED
Drawing No.

The City of Good
Living

CI TY OF SAN CARLOS

CA L I FOR N I A
BURTON: 900 CHESTNUT ST, SAN CARLOS, CA 94070
HIGHLANDS: 2600 MELENDY DR, SAN CARLOS, CA 94070
Sheet of 13
expect a difference
305 South 11th Street
San Jose, California 95112-2218
408.282.1500 | 408.297.2995 (f)
salasobrien.com
California | Georgia | Louisiana
Montana | Texas | Washington

UPGRADE OF EXISTING TENNIS AND BASKETBALL COURT LIGHTING AT

BURTON AND HIGHLANDS PARK
E-7.1 ELECTRICAL BURTON TENNIS COURT SINGLE LINE DIAGRAM 12 9.f
January 26, 2026 Packet Pg. 96

DEPARTMENT OF PUBLIC WORKS
SAN CARLOS, CALIFORNIA C2102 - UPGRADE OF EXISTING TENNIS AND BASKETBALL COURT LIGHTING AT BURTON AND HIGHLANDS PARK PROJ. MGR.: AMY NEWBY
CHECKED BY: HUGH KING
DRAWN BY: SALAS O'BRIEN
PROJECT ID: C2102
01/08/2026
STEVEN J. MACHIDA

DIRECTOR OF PUBLIC WORKS
Hz SCALE: AS NOTED
Vt SCALE: AS NOTED
Drawing No.

The City of Good
Living

CI TY OF SAN CARLOS

CA L I FOR N I A
BURTON: 900 CHESTNUT ST, SAN CARLOS, CA 94070
HIGHLANDS: 2600 MELENDY DR, SAN CARLOS, CA 94070
Sheet of 13
expect a difference
305 South 11th Street
San Jose, California 95112-2218
408.282.1500 | 408.297.2995 (f)
salasobrien.com
California | Georgia | Louisiana
Montana | Texas | Washington

UPGRADE OF EXISTING TENNIS AND BASKETBALL COURT LIGHTING AT

BURTON AND HIGHLANDS PARK
ELECTRICAL BURTON TENNIS COURT SINGLE LINE DIAGRAM - BID ALTERNATE #1 E-7.1A 13 9.f
January 26, 2026 Packet Pg. 97

CITY OF SAN CARLOS

SAN MATEO COUNTY, CALIFORNIA
Public Works Department
600 Elm Street
San Carlos, CA 94070
Contract Documents
For the
"Upgrade of Existing Tennis and
Basketball Court Lighting at Burton and
Highlands Parks”
CITY PROJECT NO: C2102

BID OPENING: February 17, 2026 at 10:00 a.m.

BID SET

9.f
January 26, 2026 Packet Pg. 98
This Page Intentionally Left Blank

9.f
January 26, 2026 Packet Pg. 99
Upgrade of Existing Tennis and Basketball Court Lighting at Burton and Highlands Parks
City Project No. C2102

DESIGN CERTIFICATION
The Plans and Technical Specifications contained herein have been prepared by, or under the responsible charge of, the following registered person(s):

Prepared by:
___________________________________________________________ HUGH KING, P.E., PROJECT MANAGER Date
Salas O’Brien Engineers
305 South 11th Street, San Jose, CA 95112
(408) 282-1500
Approved for Construction:
___________________________________________________________ GRACE LE, P.E., CITY ENGINEER Date
Public Works Department
City of San Carlos
600 Elm Street, San Carlos, CA 94070
(650) 802-4200
1/13/2026

9.f
January 26, 2026 Packet Pg. 100
This Page Intentionally Left Blank

9.f
January 26, 2026 Packet Pg. 101
iii

TABLE OF CONTENTS
A. INTRODUCTORY PAGES
Title Page No.

Cover Page i
Design Certifications ii
Table of Contents iii
Notice Inviting Sealed Proposals v
Instructions to Bidders vii
Schedule of Required Bid Documents and Agreement Forms ix B. BID PROPOSAL
Bid Proposal Cover Page P-1
Bid Proposal Table of Contents P-2
Bid Proposal P-3
Bidding Requirements P-4
Bid Schedule P-6
Designation of Subcontractors P-8
Department of Industrial Relations Registration Requirement P-8 Certifications and Affidavits
Non-Collusion Affidavit P-9
Bidder’s Qualifications P-10
Bidder’s References P-11
Signature Pages P-12
Bidder’s Bond P-14
C. AGREEMENT AND AGREEMENT FORMS
Agreement and Agreement Forms Table of Contents A-1
Construction Agreement A-2
Exhibit A – Contractor’s Bid Proposal A-11
Resolution of Construction Claims A-12
Agreement Forms
Payment Bond A-14
Performance Bond A-16
Workers Compensation Certification A-18
Certification of Safety Requirements for Contractors and Vendors A-19 Drug-Free Workplace Certification A-20
Escrow Agreement for Security Deposits in Lieu of Retention (Optional) A-21 Guarantee A-23
D. GENERAL PROVISIONS
Section 1 Terms and Definitions GP-1
Section 2 Proposal Requirements and Conditions GP-6
Section 3 Review of Bids, Contract Award and Execution GP-9 Section 4 Scope and Control of the Work GP-14
Section 5 Changes of Work GP-21
Section 6 Control of Materials GP-25
Section 7 Utilities GP-28
Section 8 Prosecution and Progress GP-31
Section 9 Responsibilities of the Contractor GP-40
Section 10 Measurement and Payment GP-55
Section 11 Guarantee GP-61

9.f
January 26, 2026 Packet Pg. 102
iv
E. SPECIAL PROVISIONS
Section 1 Description of Work SP-3
Section 2 Location SP-3
Section 3 Days and Hours of Operation SP-3
Section 4 Time of Completion and Liquidated Damages SP-3 Section 5 Licenses SP-3
Section 6 Encroachment Permit SP-4
Section 7 Staging / Construction Area SP-4
Section 8 City Furnished Materials SP-4
Section 9 Water and Power SP-4
Section 10 Owner / Contractor Meetings SP-5
Section 11 Notification or Residents and Merchants SP-5 Section 12 Storm Water Pollution Prevention SP-6
Section 13 Haul Routes SP-6
Section 14 Traffic Control SP-6
Section 15 Construction Schedule SP-6
Section 16 Submittals SP-6
Section 17 Street Sweeping SP-6
Section 18 Ground Protection Mats SP-6
F. TECHNICAL PROVISIONS

26 05 05 Selective Demolition for Electrical
26 05 10 Electrical General Provisions
26 05 12 Basic Material and Methods

9.f
January 26, 2026 Packet Pg. 103
If you require translation for this notice, please contact the City Clerk’s Office at 650-802-4222.

CITY OF SAN CARLOS

SAN MATEO COUNTY, CALIFORNIA

NOTICE INVITING SEALED PROPOSALS
NOTICE IS HEREBY GIVEN that sealed proposals or bids for the Upgrade of Existing Tennis and Basketball Court Lighting at Burton and Highlands Parks, No. C2102 shall be publicly opened, examined and announced on Tuesday, February 17, 2026 at 10:00 a.m. at the San Carlos City Clerk’s Office at City Hall – 600 Elm Street, San Carlos, CA 94070. Sealed bid proposals shall be received in-hand by the City Clerk before the bid opening date and time.

A Class B and/or Class C10, Contractor’s License is required for this work. Work will be done, and payments will be made in accordance with provisions more particularly described in the plans and specifications.

The scope of work generally includes the trenching and installation of sports field lighting, service distribution equipment, conduits, boxes, and the surface restoration of existing improvements. Bids are required for the entire work described herein in accordance with the instructions to bidders. The Engineer’s Estimate is between $300,000 and $400,000
Bids must be accompanied by a Proposal guarantee amounting to ten (10%) percent of the bid as described in the specifications. Said guarantee shall be forfeited to the City in case the bidder depositing the same does not, within fifteen days after written notice that the contract has been awarded to him (1) enter into a contract with the City and (2) furnish Performance and Payment Bonds as described in the specifications.

The City Council reserves the privilege of rejecting any and all proposals or to waive any irregularities or informalities in any proposals or in the bidding. No bidder may withdraw his proposal for a period of ninety (90) calendar days after the date set for opening of proposals.

As a “Public Works” project and pursuant to Section 1773 of the Labor Code, the general prevailing wage rates for San Mateo County shall apply to this contract, as determined by the Director of the California Department of Industrial Relations.

Plans and specifications, forms of proposals, bonds and contracts may be inspected or obtained from ARC Document Solutions at 1100 Industrial Rd., Unit 13, San Carlos, CA 94070, (650) 631-2310; email at [email protected]; or visit the City of San Carlos Website at www.cityofsancarlos.org. Bidders must register with ARC Document Solutions to obtain further information.

Bidders are directed to the Instructions for Bidders for additional contract requirements.

Crystal Mui, City Clerk
Published: January 29 and February 4, 2026

9.f
January 26, 2026 Packet Pg. 104
vi
This Page Intentionally Left Blank

9.f
January 26, 2026 Packet Pg. 105
vii

CITY OF SAN CARLOS

SAN MATEO COUNTY, CALIFORNIA

INSTRUCTIONS TO BIDDERS

1. Proposal Requirements: Bidder's attention is directed to the General Provisions of these Specifications for the requirements and conditions which must be adhered to in the preparation of the proposal form and submission of this proposal.

2. Receipt of Bids and Bid Opening: Proposals shall be received at the office of the City Clerk, 600 Elm Street, San Carlos, CA 94070, not later than the bid deadline described in the Notice Inviting Sealed Proposals. Proposals shall be submitted in a sealed envelope, plainly marked on the outside "Upgrade of Existing Tennis and Basketball Court Lighting at Burton and Highlands Parks, No. C2102”.

3. Time of Completion and Liquidated Damages: All work shall be diligently prosecuted to completion before the expiration of One Hundred Fifty (150) Calendar Days from the date of receipt of the “Notice to Proceed”. If the Contractor fails to complete the work within the above-specified time limit, the Contractor shall pay liquidated damages to the City, computed at the rate of Five Hundred Dollars ($500) for each calendar day beyond the specified time limit until the project is completed. See the Special Provisions for additional time of completion milestone requirements.

4. Bid Security: Pursuant to California Public Contract Code Section 20170, each proposal shall be accompanied by a bid security in the form of cash, cashier’s or certified check, or bidder’s bond made payable to the “City of San Carlos” for an amount equal to at least ten percent (10%) of the Bid Amount and no bid shall be considered unless such security is enclosed therewith.

5. Bid Guarantee: No bid shall be withdrawn except as provided for pursuant to Public Contract Code Section 5103, and the bidder shall guarantee the Total Bid Price for a period of ninety (90) calendar days from the date of the bid opening.

6. Contractor’s License: Bidders are to be licensed in accordance with the provisions of the “Contractor’s License Law,” Chapter 9 of Division 3 of the State Business and Professions Code. In addition, at the time of submitting the bid, bidder must have the following classification of contractor’s license: Class B, Contractor’s License.

7. Additional Registration and Licensing Requirements: In accordance with Labor Code Section 1725.5, Contractor and all Subcontractors shall be registered with the California Department of Industrial Relations (DIR) as a condition of being listed on the proposal form. All 2nd and lower tier subcontractors working on the project shall be registered with the Department of Industrial Relations prior to the work being performed. Contractor and all Subcontractors shall also obtain a City business license prior to the work being performed.

8. Prevailing Wage: The work contemplated by this contract is a “public work” subject to prevailing wages under California Labor Code Section 1770 et. seq. The successful bidder will be required to pay not less than the prevailing rate of per diem wages as determined by the California Department of Industrial Relations or Federal Minimum Wage Rates as determined by the United States Secretary of Labor in effect on the date the work is performed.

9.f
January 26, 2026 Packet Pg. 106
viii

9. Bonds and Insurance: All contractors are required to furnish to the City faithful performance, labor and materials, and 2-year warranty bonds and insurance, as required in the specifications.

10. Security Substitution: Pursuant to California Public Contract Code Section 22300, and at the request and expense of the Contractor to whom the Contract is awarded, securities of a value equivalent to the retention amount, in a form approved by the City, shall be permitted in substitution for money withheld by the City to ensure performance under the Contract.

11. Requests for Clarification and Project Communication: In the event the bidder has any questions as to the meaning of any part of the plans and specifications, or if the bidder finds any error, inconsistency, or ambiguity in the Contract Documents, the bidder shall make a written request for clarification prior to submitting its bid. All questions and comments regarding the plans and specifications should be directed to the Project Manager indicated below and will only be responded to if received in writing at least five (5) working days before the bid opening. Questions received after this time and date may not be addressed.

City of San Carlos – Public Works Department
600 Elm Street, San Carlos, CA 94070
Attention: Michael Runchey, Associate Engineer
[email protected]
Telephone: (650) 802-4291
Fax: (650) 595-6704

12. These “Instructions to Bidders” are hereby made a part of the Contract Documents.

9.f
January 26, 2026 Packet Pg. 107
ix

SCHEDULE OF REQUIRED

BID DOCUMENTS AND AGREEMENT FORMS
Submit with Bid Proposal - The following documents must be completed, signed and submitted as part of the Bid Proposal, prior to the bid opening:

Completed Bid Proposal consisting of:

A. Bid Schedule
B. Designation of Subcontractors
C. Certifications and Affidavits:

1. Non-Collusion Affidavit

2. Bidder’s Qualifications

3. Bidder’s References

4. Bidder’s Personnel
D. Signature Pages
E. Bid Guarantee (Bid Bond attached)
F. Addendum, if any (not attached) – signature page to be signed and submitted by bidder.

Submit Prior to Notice to Proceed -The following documents must be completed, signed and submitted after approval and award of the Contract, prior to the Notice to Proceed:

A. Agreement
B. Payment Bond
C. Performance Bond
D. Insurance Endorsements

1. General Liability

2. Automobile Liability

3. Worker’s Compensation
E. Certifications

1. Workers Compensation

2. Safety Requirements for Contractors and Vendors

3. Drug-Free Workplace
Submit Prior to Final Acceptance - The following documents must be completed, signed and submitted prior to final acceptance:

A. Guarantee
B. Stop Notice Releases, if any (form not included)
C. Record Drawings

9.f
January 26, 2026 Packet Pg. 108
x
This Page Intentionally Left Blank

9.f
January 26, 2026 Packet Pg. 109
Agreement Upgrade of Existing Tennis and Basketball Court Lighting at Burton and Highlands Parks, No. C2102 Page P-1

CITY OF SAN CARLOS

PUBLIC WORKS DEPARTMENT
600 Elm Street
San Carlos, CA 94070

BID PROPOSAL
FOR:
“Upgrade of Existing Tennis and Basketball Court Lighting at Burton and Highlands Parks”
City Project No. C2102
IN

CITY OF SAN CARLOS, COUNTY OF SAN MATEO

STATE OF CALIFORNIA
NOTE: All portions of all pages included within this section, and acknowledgement of receipt of any issued addenda must be properly completed, signed, and submitted with the bid. Failure to do so may result in the bid being deemed non-responsive by the City.

9.f
January 26, 2026 Packet Pg. 110
Agreement Upgrade of Existing Tennis and Basketball Court Lighting at Burton and Highlands Parks, No. C2102 Page P-2

BID PROPOSAL

TABLE OF CONTENTS
Bid Proposal Cover Page .................................................................................... P-1 Bid Proposal Table of Contents .......................................................................... P-2 BID PROPOSAL PAGES TO BE SUBMITTED WITH BID:

Bid Proposal ....................................................................................................... P-3 Bidding Requirements ........................................................................................ P-4 Bid Schedule ...................................................................................................... P-6 Designation of Subcontractors ............................................................................ P-8 Department of Industrial Relations Registration Requirement ............................. P-8 Certifications and Affidavits
Non-Collusion Affidavit ................................................................................. P-9 Bidder’s Qualifications .................................................................................. P-10 Bidder’s References ...................................................................................... P-11 Signature Pages ................................................................................................. P-12 Bid Bond ............................................................................................................ P-14

9.f
January 26, 2026 Packet Pg. 111
Agreement Upgrade of Existing Tennis and Basketball Court Lighting at Burton and Highlands Parks, No. C2102 Page P-3

BID PROPOSAL
" Upgrade of Existing Tennis and Basketball Court Lighting at Burton and Highlands Parks”
CITY PROJECT NO. C2102
Bid To: Honorable Mayor and City Council
City of San Carlos, City Hall
San Carlos, CA 94070
Bid From:

Bidder’s Company Name:

Contact Person:

Business Street Address:

City, State, Zip Code:

Phone No.: ( )
E-mail: __ __________________
Contractor License No.:

Contractor License Expiration Date: ____
Dear Mayor and Members of the City Council:

I, as bidder, declare that I have satisfied myself as to the actual conditions and requirements of the work by careful examination of the location of the proposed work, by examination of the plans and specifications including the Instructions to Bidders, and by other measures, and that after submission of the bid, I will not dispute, complain or assert that there was any misunderstanding in regards to the nature or amount of work to be done.

I hereby certify that only those parties interested in this proposal as principals are named in this proposal and that this bid is genuine, and not sham, collusion, or made in the interest or in behalf of any person not named. I have not directly or indirectly induced or solicited any other bidder, person, firm or corporation to put in a sham bid, or refrain from bidding, and have not in any manner sought by collusion to secure for myself an advantage over any other bidder.

I agree that if this proposal is accepted, I will contract with the City of San Carlos in the form of agreement proposed, will provide all bonds and insurance certificates as required by the agreement and will furnish all equipment and materials and perform all the labor required to complete the work in accordance with the plans, specifications and other contract documents, for the unit or lump sum prices set forth in the Bid Schedule.

9.f
January 26, 2026 Packet Pg. 112
Agreement Upgrade of Existing Tennis and Basketball Court Lighting at Burton and Highlands Parks, No. C2102 Page P-4
I have carefully checked all of the figures in the Bid Schedule and understand that the City shall not be responsible for any errors or omissions on my part in making up this bid. I agree that this bid may not be withdrawn for a period of ninety (90) calendar days from the date of the bid opening and that the City reserves the right to reject any or all bids, waive any informality in bids received, and may at its option make the award that in the judgment of the City is to the best interest of the City.

BIDDING REQUIREMENTS
The work to be done and referred to here is in the City of San Carlos, County of San Mateo, State of California, and shall be constructed in accordance with all provisions of the project specifications and project plans including: any addenda; the Instructions to Bidders, the Agreement; the Standard Specifications and Standard Plans of the California Department of Transportation, current edition; the Labor Surcharge and Equipment Rental Rates; and payment of not less than the higher of the prevailing rate of per diem wages as determined by the Director of the California Department of Industrial Relations or Federal minimum wage rate as predetermined by the United States Secretary of Labor in effect on the date the work is performed.

For each of the various contract items of work designated on the Bid Schedule, the bidder shall set forth a unit or lump sum price which the bidder shall then use to calculate and designate a total cost for each item of work based upon the designated estimate of the quantities of work to be done, all in clearly legible figures in the respective spaces of the Bid Schedule provided for this purpose.

The bidder shall include in the unit or lump sum prices paid for the various contract items of work full compensation for conforming to the requirements of the Contract Documents and for completing all of the work required. No additional compensation shall be granted for any additional items unless categorized and approved as extra work under the terms of the agreement.

The estimate of construction quantities set forth in the Bid Schedule is approximate only, being given only as a basis for the comparison of bids, and the City does not expressly or by implication agree that the actual amount of work will correspond with those estimated quantities. The City reserves the right to increase the amount of any class or portion of the work or to omit portions of the work as may be deemed necessary or expedient by the Engineer. There shall be no claim for damage or loss of anticipated profit for any bid item omitted in its entirety, and payment will only be made on the basis of actual quantities of work performed.

If the City accepts this proposal and the bidder fails to enter into the contract and/or fails to furnish bonds as required by the specifications with sureties satisfactory to the City within ten (10) calendar days after the bidder has received notice from the City that the contract has been awarded, the City may, at its option, determine that the bidder has breached and abandoned the contract, and thereupon, the bid security accompanying this proposal shall be forfeited and become the property of the City.

The Notice to Proceed will not be issued until after the contract has been fully executed. The contractor shall commence the work under the contract within ten (10) days following the date of the Notice to Proceed, or as otherwise specified in the project specifications or negotiated with

9.f
January 26, 2026 Packet Pg. 113
Agreement Upgrade of Existing Tennis and Basketball Court Lighting at Burton and Highlands Parks, No. C2102 Page P-5
the City, and shall diligently prosecute the project to completion within the time specified. The contract completion period is inclusive of the time needed for material delivery.

Bidder shall comply with the requirements of the California Labor Code, including sections 1770 et seq., and pay not less than the prevailing rate of per diem wages as determined by the Director of the California Department of Industrial Relations. Copies of such prevailing rate of per diem wages are on file at the office of the City Engineer, which copies shall be made available to any interested party upon request. The Contractor shall post a copy of such determination at the job site.

As required by Section 6705 of the California Labor Code and in addition thereto, for any excavation of any trench or trenches five feet (5’) or more in depth, the Contractor shall submit to the Engineer for acceptance, a detailed plan showing the design of shoring, bracing, sloping, or other provisions to be made for worker protection from the hazard of caving ground during the excavation of such trench or trenches. Structural calculations prepared, stamped and signed by a Registered Engineer licensed to practice in the State of California shall accompany the plan to verify the structural safety and adequacy of the sheeting, shoring and bracing to be used on the project. No such plan shall allow any shoring, sloping or a protection system less effective than that required by the Construction Safety Orders of the State Division of Occupational Safety and Health.

In accordance with the provisions of Section 1860 of the Labor Code, prior to performing work on the Contract, each Contractor to whom a public works contract is awarded shall sign and file with the City the Worker’s Compensation Certification included in the “Agreement and Agreement Forms” section of these specifications.

Bidder’s attention is directed to Section 2 of the General Provisions for additional information and requirements pertaining to the submission of a bid, and which is incorporated here by reference.

Bidder’s attention is directed to Section 2.13, “Required Contractor and Subcontractor Registration,” of the General Provision. All contractors shall register with the Department of Industrial Relations according to Labor Code Section 1725.5.

Any protest of the proposed contract award must be submitted in writing to the City no later than 5:00 p.m. on the fifth business day following the date of the bid opening. Bidder is directed to the “Bid Protest Procedure” Section of the General Provisions for additional information.

9.f
January 26, 2026 Packet Pg. 114
Agreement Upgrade of Existing Tennis and Basketball Court Lighting at Burton and Highlands Parks, No. C2102 Page P-6

BID SCHEDULE
Bids are to be submitted for the entire work. All applicable sales taxes, state and/or federal, and any other special taxes, patent rights or royalties are included in the prices quoted in the bid.

In the case of a discrepancy between the product of the “Estimated Quantity” and the “Unit Price” with the “Item Total”, the product of the “Estimated Quantity” and the “Unit Price” shall prevail and the figure shown as the “Item Total” shall be adjusted accordingly, except as provided in cases involving (a) or (b) below:
(a) If the amount set forth as a unit price is unreadable or otherwise unclear, or is omitted, or is the same as the amount entered in the item total column, then the amount set forth in the item total column for the item shall prevail and shall be divided by the estimated quantity for the item and the price thus obtained shall be the unit price; (b) (Decimal Errors) If the product of the entered unit price and the estimated quantity is exactly off by a factor of ten, one hundred, etc., or one-tenth, or one-hundredth, etc. from the item total, the discrepancy will be resolved by using the entered unit price or item total, whichever most closely approximates percentage-wise the unit price or item total in the Engineer’s Estimate.

If both the unit price and the item total are unreadable or otherwise unclear, or are omitted, the bid may be deemed irregular. Likewise if the item total for a lump sum item is unreadable or otherwise unclear, or is omitted, the bid may be deemed irregular unless the project being bid has only a single item and a clear, readable total bid is provided.

In the case of a discrepancy between the sum of the figures in the item total column (adjusted per the previous paragraphs, if necessary) and the amount set forth as the total base bid amount, the sum of the figures in the item total column shall prevail and the amount shown as the total base bid amount shall be adjusted accordingly.

9.f
January 26, 2026 Packet Pg. 115
Agreement Upgrade of Existing Tennis and Basketball Court Lighting at Burton and Highlands Parks, No. C2102 Page P-7
BASE BID ITEMS ARE AS FOLLOWS:
"Upgrade of Existing Tennis and Basketball Court Lighting at Burton and Highlands Parks”
PROJECT NO. C2102
Item
No.

Item
Description
Estimated
Quantity Unit
Unit
Price
Item
Total
1 Mobilization, Punchlist, &
Cleaning 1 LS $ $
2 Traffic Control and Construction
Area Signs 1 LS $ $
3 Site Demolition – Burton 1 LS $ $
4 Site Demolition – Highlands 1 LS $ $
5 Excavation & Trenching – Burton 1 LS $ $
6 Excavation & Trenching –
Highlands 1 LS $ $
7 Electrical Switchgear – Burton 1 LS $ $
8 Sports Lighting – Materials &
Labor – Burton 1 LS $ $
9 Sports Lighting – Materials &
Labor – Highlands 1 LS $ $
10 Sports Lighting – Materials &
Labor – Highlands 1 LS $ $
Total Base Bid Amount: $___________________

ALTERNATE BID ITEM
11 Installation and Removal of
Pathway Lighting - Burton 1 LS $ $
Total Base Bid + Alternate Amount: $___________________ Notes:

1. The Contract will be compared and awarded on the basis of the Base Bid + Alternate Amount.

2. All items on the Base Bid Schedule must be bid. Partial bids will not be accepted.

3. The City reserves the right to reject all bids for any reason whatsoever.

4. Issuance of the “Notice to Proceed” will constitute the beginning of the Contract.

5. Bid Schedule prices shall include all labor, materials, equipment, and incidentals required to fully perform the work in accordance with the plans, specifications, and all other contract

9.f
January 26, 2026 Packet Pg. 116
Agreement Upgrade of Existing Tennis and Basketball Court Lighting at Burton and Highlands Parks, No. C2102 Page P-8
documents. The Contractor shall be responsible for completing all work associated with the bid items, whether or not every component is specifically itemized in the Bid Schedule.

9.f
January 26, 2026 Packet Pg. 117
Agreement Upgrade of Existing Tennis and Basketball Court Lighting at Burton and Highlands Parks, No. C2102 Page P-9

DESIGNATION OF SUBCONTRACTORS
The Contractor shall perform work equaling at least 30 percent of the value of the original total bid with the Contractor’s own employees and equipment, owned or rented, with or without operators.

In accordance with the Subletting and Subcontracting Fair Practices Act, Public Contract Code sections 4100 et seq. (the “Subcontracting Act”), the Bidder hereby certifies and submits, as required by law, the following concerning subcontractors:

1. The portion of the work, which will be done by each such subcontractor; and

2. The name and location of the place of business of each subcontractor who will perform work or labor, fabricate a portion of the work or improvement according to detailed drawings in the project plans, or render service to the Contractor in or about the construction of the work in an amount in excess of one-half of one percent (0.5%) of the Contractor’s total bid.

Portion of Work to be
Performed by Subcontractor
Subcontractor Name,
Address and License Number
(License No. Required under AB 44)
Registered
with DIR?
 check if yes

1. 2.

3. 4.

5. 6.

7. (For additional Subcontractors, attach copies of this sheet as necessary) NOTE: THIS CERTIFICATE MUST BE COMPLETED AND RETURNED ALONG WITH THE CONTRACTOR’S BID PROPOSAL.  DEPARTMENT OF INDUSTRIAL RELATIONS REGISTRATION REQUIREMENT In accordance with Labor Code Section 1725.5, all contractors and subcontractors listed on a public works bid proposal must be registered with the DIR.

9.f
January 26, 2026 Packet Pg. 118
Agreement Upgrade of Existing Tennis and Basketball Court Lighting at Burton and Highlands Parks, No. C2102 Page P-10

NON-COLLUSION AFFIDAVIT
Title 23 United States Code Section 112 and
Public Contract Code Section 7106
State of California )
) ss.

County of _______________ )
(name of person signing affidavit), being first duly
sworn, deposes and says under penalty of perjury under the laws of the State of California, that he or she has the right, power, legal capacity, and authority to execute this Affidavit as (sole owner, partner, president, secretary, etc) of
(legal name of Bidder), the Bidder, that the
Bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation; that the Bid is genuine and not collusive or sham; that the Bidder has not directly or indirectly induced or solicited any other Bidder to put in any false or sham Bid, and has not directly or indirectly colluded, conspired, connived, or agreed with any Bidder or anyone else to put in a sham Bid, or that anyone shall refrain from Bidding; that the Bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the Bid price of the Bidder or any other Bidder, or to fix any overhead, profit, or cost element of the Bid price, or of that of any other Bidder, or to secure any advantage against the public body awarding the Contract or anyone interested in the proposed Contract; that all statements contained in the Bid are true; and, further, that the Bidder has not, directly or indirectly, submitted his Bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will not pay, any fee to any corporation, partnership, company association, organization, Bid depository, or to any member or agent thereof to effectuate a collusive or sham Bid.

IN WITNESS WHEREOF, the undersigned, as bidder, represent and warrant that they have the right, power, legal capacity, and authority to enter into and execute this document on behalf of the Bidder, and have executed this document by setting hereto their names, titles, and signature.

(Signature of Representative of Bidder)
Subscribed and sworn to before me, a Notary Public in and for the State of California, County of _____________________, this ______ day of _________________, 20____.

Signature of Notary Public:________________________
My Commission expires __________________, 20_____ (Seal) NOTE: THIS AFFIDAVIT MUST BE COMPLETED AND RETURNED AS PART OF THE CONTRACTOR’S BID PROPOSAL.

9.f
January 26, 2026 Packet Pg. 119
Agreement Upgrade of Existing Tennis and Basketball Court Lighting at Burton and Highlands Parks, No. C2102 Page P-11
BIDDER’S QUALIFICATIONS
The following statements as to the financial qualifications and experience of the Bidder are submitted as a part of this Bid and the Bidder guarantees the truthfulness and accuracy of the information. Pursuant to Public Contract Code 10165, financial statements and experience questionnaires are not public records and are not open to public inspection.

Financial Data
Reference is hereby made to the following bank or banks as to the financial responsibility of the bidder.

NAME OF BANK ADDRESS

Experience Data
The Bidder has been engaged in the contracting business, under the present business name for ________ years. Experience in work of a nature similar to that covered in this Bid extends over a period of __________ years.

The Bidder as a Contractor has never failed to satisfactorily complete a contract awarded to him, except as follows: (Name all exceptions and reasons therefore):

Bidder’s Personnel
The following is a list of key personnel including a listing of the person’s knowledge, ability or trade along with a brief description of their experience. If Bidder is awarded the Contract, it is understood that the work will be directed and actively supervised by one of these persons.

List of Personnel Knowledge/Skills Experience

9.f
January 26, 2026 Packet Pg. 120
Agreement Upgrade of Existing Tennis and Basketball Court Lighting at Burton and Highlands Parks, No. C2102 Page P-12
BIDDER’S REFERENCE
List three (3) major projects which the Bidder has performed comparable work within the last three (3) years. Provide a contact person and description of the project, or other such information that will demonstrate the ability to vigorously prosecute the work.

1. PROJECT NAME LOCATION YEAR COMPLETED

AGENCY CONTACT PERSON TELEPHONE NO. FINAL CONSTRUCTION COST

BRIEF DESCRIPTION OF THE WORK AND/OR MANNER OF EXECUTION

2. PROJECT NAME LOCATION YEAR COMPLETED

AGENCY CONTACT PERSON TELEPHONE NO. FINAL CONSTRUCTION COST

BRIEF DESCRIPTION OF THE WORK AND/OR MANNER OF EXECUTION

3. PROJECT NAME LOCATION YEAR COMPLETED

AGENCY CONTACT PERSON TELEPHONE NO. FINAL CONSTRUCTION COST

BRIEF DESCRIPTION OF THE WORK AND/OR MANNER OF EXECUTION

9.f
January 26, 2026 Packet Pg. 121
Agreement Upgrade of Existing Tennis and Basketball Court Lighting at Burton and Highlands Parks, No. C2102 Page P-13

SIGNATURE PAGES
The terms and conditions of the final contract when executed shall control and supersede anything herein to the contrary or inconsistent with such contract.

The bidder states that he has inspected the site of the proposed work in order to satisfy himself, by personal examination, or by such other means as he prefers, of the location of the proposed work and as to the actual conditions of and at the work site. The bidder hereby offers to furnish all labor, materials, equipment, transportation, and services necessary to complete the work on this project in accordance with the Contract Documents and to complete all requirements of the Contract Documents for the sums quoted in this Bid.

Addenda:
(if any) bidder has received and examined all addenda issued during the bid period and agrees that all addenda shall be made a part of the Contract Documents. The bidder acknowledges receipt and incorporation of all impacts resulting from all addenda issued by inserting the number of each addendum below OR by signing and submitting with the bid proposal the signature page from each addendum.

Addendum Nos. _____, _____, _____, _____, _____, _____, _____, _____ Bidder’s Guarantee:

In accordance with Public Contract Code Section 20170, accompanying this Bid is _______________ (insert the word “Cash”, “Cashier’s Check”, “Certified Check” or “Bidder’s Bond” as the case may be) made payable to the City of San Carlos in the amount of ___________________________________________________($_______________) equal to at least ten percent (10%) of the total amount of this bid. This amount is given as a guarantee that, in case the undersigned defaults in executing a contract and/or furnishing the necessary bonds after contract award, the said guarantee and the money payable thereon shall become and remain the property of the City as liquidated damages.

Company Profile:

The names of all persons interested in the foregoing bid as principals are as follows:
(Note: If bidder or other interested person is a corporation, state the legal name of corporation, also names of the president, secretary, treasurer and manager thereof; if partnership, state true name of firm, also names of all individual partners composing firm; if bidder or other interested person is an individual, state first and last name in full).

Firm Name:

Business Address:

Names and Titles of Company Officers:

1. 2.

3. 4.

9.f
January 26, 2026 Packet Pg. 122
Agreement Upgrade of Existing Tennis and Basketball Court Lighting at Burton and Highlands Parks, No. C2102 Page P-14
Proposal Execution:

IN WITNESS WHEREOF, the undersigned, as bidder, represent and warrant that they have the right, power, legal capacity, and authority to enter into and execute this document on behalf of the Bidder, and have executed this document by setting hereto their names, titles, and signatures. The representations made herein, including but not limited to the above contractor’s license, expiration date and name of bidder, are true and correct, shall be complied with and are made under penalty of perjury.

IF SOLE OWNER, sign here:

I sign as sole owner of the business named above.___________________________ Social Security Number:_________________________________________________ Employer Identification Number:___________________________________________ IF PARTNERSHIP, sign here:

The undersigned certify that we are partners in the business named above and that we sign this contract proposal with full authority to do so. (one or more partners sign) ______________________________________________________________________ ______________________________________________________________________ Federal Tax Identification No. (EIN):_________________________________________ State Tax Identification No.:_______________________________________________ IF CORPORATION, execute here:

The undersigned certify that they sign this contract proposal with full and proper authorization to do so.

Corporate name _________________________________________________________ By_____________________________________ (Title) _________________________ By_____________________________________ (Title) _________________________ Incorporated under the laws of the State of ___________________________________ Federal Tax Identification No. (EIN):_________________________________________ State Tax Identification No.:_______________________________________________ Subscribed and sworn to before me, a Notary Public in and for the State of California, County of _____________________, this ______ day of _________________, 20____.

Signature of Notary Public:________________________
My Commission expires __________________, 20_____ (Seal)

9.f
January 26, 2026 Packet Pg. 123
Agreement Upgrade of Existing Tennis and Basketball Court Lighting at Burton and Highlands Parks, No. C2102 Page P-15
BIDDER’S BOND
To Accompany Contract Proposal
KNOW ALL PERSONS BY THESE PRESENTS:

That we, the undersigned _________________________________________, as principal and __________________________________, as surety, are held and firmly bound unto the City of San Carlos as OWNER in the penal sum of TEN PERCENT (10%) of the total amount of the bid of the principal, for the payment of which, well and truly to be made, we hereby jointly and severally bind ourselves, successors and assigns.

The condition of the above obligation is such that whereas the Principal has submitted to OWNER a certain BID attached hereto and hereby made a part hereof to enter into a contract in writing, for Upgrade of Existing Tennis and Basketball Court Lighting at Burton and Highlands Parks, No.

C2102.

NOW, THEREFORE
(a) If said BID shall be rejected, or
(b) If said BID shall be accepted and the Principal shall execute and deliver a contract in the Form of Contract attached hereto (properly completed in accordance with said BIDS including all required bonds for faithful performance and labor and material, as well as all required evidence of insurance) then this obligation shall be void, otherwise the same shall remain in force and effect.

In the event the City brings suit upon this Bond, surety shall pay reasonable attorney’s fees and costs incurred by the City in such suit.

The Surety, for value received, stipulates and agrees that the obligations of said Surety and its BOND shall be in no way impaired or affected by any extension of the time within which the City of San Carlos may accept such BID; and said Surety does hereby waive notice of any such extension.

IN WITNESS WHEREOF, the Principal and the Surety have hereunto set their hands and seals, and such of them as are corporations have caused their corporate seals to be hereto affixed and these presents to be signed by their proper officers, this day and year first set forth.

By: (L.S.) By:
(Principal) (Seal) (Surety) (Seal)
Subscribed and sworn to before me, a Notary Public in and for the State of California, County of _____________________, this ______ day of _________________, 20____.

Signature of Notary Public:________________________ (Seal) My Commission expires __________________, 20_____

9.f
January 26, 2026 Packet Pg. 124
Agreement Upgrade of Existing Tennis and Basketball Court Lighting at Burton and Highlands Parks, No. C2102 Page P-16
IMPORTANT: Surety companies executing BONDS must be authorized to transact Surety insurance in the State of California. If Contractor is Partnership, all partners should execute BOND.

This Page Intentionally Left Blank

9.f
January 26, 2026 Packet Pg. 125
Agreement Upgrade of Existing Tennis and Basketball Court Lighting at Burton and Highlands Parks, No. C2102 Page A-1

AGREEMENT AND AGREEMENT FORMS

TABLE OF CONTENTS
Construction Agreement ........................................................................................... A-2 Exhibit A: Contractor’s Bid Proposal ....................................................................... A-11 Resolution of Construction Claims ............................................................................ A-12 Agreement Forms
Payment Bond .............................................................................................. A-14 Performance Bond ........................................................................................ A-16 Workers Compensation Certification ............................................................ A-18 Certification of Safety Requirements for Contractors and Vendors ................ A-19 Drug Free Workplace Certification ................................................................ A-20 Escrow Agreement for Security Deposits in Lieu of Retention (Optional) ...... A-21 Guarantee ..................................................................................................... A-23

9.f
January 26, 2026 Packet Pg. 126
Agreement Upgrade of Existing Tennis and Basketball Court Lighting at Burton and Highlands Parks, No. C2102 Page A-2

AGREEMENT FOR PUBLIC PROJECTS
This Agreement is made and entered into as of the _____ day of ____________, ____ by and between the City of San Carlos hereinafter called "CITY" and ____________________ hereinafter called "CONTRACTOR.”

RECITALS
This Agreement is entered into with reference to the following facts and circumstances:

A. That CITY desires to engage CONTRACTOR to provide a product and/or services to the CITY;
B. That CONTRACTOR is qualified to provide the product and/or services to the CITY and; THEREFORE, the CITY has elected to engage CONTRACTOR upon the terms and conditions as hereinafter set forth.

1. Services. The services to be performed by CONTRACTOR under this Agreement are described in Exhibit A, the CONTRACTOR’S bid proposal which is, by this reference, incorporated herein and made a part hereof as though it were fully set forth herein.

Performance of the services specified in said Exhibit is hereby made an obligation of CONTRACTOR under this Agreement, subject to any changes that may be made subsequently hereto upon the mutual written agreement of the said parties.

Where in conflict, the terms of this Agreement supersede and prevail over any terms set forth in Exhibit A.

2. Term; Termination. (a) The term of this Agreement shall commence upon the date hereinabove written and shall expire upon the date enumerated in Exhibit A, delivery of the product or completion of performance of services hereunder by CONTRACTOR, whichever date shall first occur. (b) Notwithstanding the provisions of (a) above, CITY may terminate this Agreement without cause by giving written notice not less than thirty (30) days prior to the effective date of termination, which date shall be included in said notice. CITY shall compensate CONTRACTOR for any product delivered and/or for services rendered, and reimburse CONTRACTOR for costs and expenses incurred, to the date of termination, calculated in accordance with the provisions of paragraph 3. In ascertaining the services actually rendered to the date of termination, consideration shall be given both to completed work and work in process of completion. Nothing herein contained shall be deemed a limitation upon the right of CITY to terminate this Agreement for cause, or otherwise to exercise such rights or pursue such remedies as may accrue to CITY hereunder.

3. Compensation; Expenses; Payment. CITY shall compensate CONTRACTOR for all products supplied or services performed by CONTRACTOR hereunder as shown in Exhibit A attached hereto and by this reference incorporated herein.

9.f
January 26, 2026 Packet Pg. 127
Agreement Upgrade of Existing Tennis and Basketball Court Lighting at Burton and Highlands Parks, No. C2102 Page A-3
Notwithstanding the foregoing, the combined total of compensation and reimbursement of costs payable hereunder shall not exceed the sum of $________________, as provided in the approved bid documents or in this Agreement unless additional amounts have been authorized in the acceptance of the bid and approved in advance of supplying the product, performing the services or incurring the costs and expenses by CITY’s City Manager (for contracts less than $175,000 or authorized by City Council action for contracts $175,000 or more by motion duly made and carried).

Compensation and reimbursement of costs and expenses hereunder shall be payable upon CONTRACTOR meeting contract milestones as defined in Exhibit A. Billing shall include an itemized statement, briefly describing by task and labor category or cost/expense items billed.

4. Additional Services. In the event the public project requires the delivery of additional products or performance of additional services not otherwise included within Exhibit A, such products or services must be authorized in advance by CITY’s City Manager (for contracts less than $175,000 or authorized by City Council action for contracts $175,000 or more. Such amendment to this Agreement shall include a description of the project or services to be performed thereunder, the maximum compensation and reimbursement of costs and expenses payable therefore, the time of performance thereof, and such other matters as the parties deem appropriate. Any additional services causing the total contract price to exceed $175,000, shall require approval by the City Council. Except to the extent modified by written amendment, all other terms and conditions of this Agreement shall be deemed incorporated in each such amendment.

5. Records. CONTRACTOR shall keep and maintain accurate records of products delivered or of all time expended in performing services and costs and expenses incurred relating thereto. Said records shall be available to CITY for review and copying during regular business hours at CONTRACTOR’s place of business or as otherwise agreed upon by the parties.

6. Authorization. This Agreement becomes effective when endorsed by both parties in the space provided below.

7. Reliance on Specialized Professional Skill of CONTRACTOR. CONTRACTOR represents that it has the necessary professional skills to perform the services required and the CITY shall rely on such specialized skills of the CONTRACTOR to do and perform the work. In performing services hereunder CONTRACTOR shall adhere to the standards generally prevailing for the performance of services similar to those to be performed by CONTRACTOR hereunder.

8. Documents. All documents, plans, drawings, renderings, and other papers, or copies thereof, as finally rendered, prepared by CONTRACTOR pursuant to the terms of this Agreement, shall, upon preparation and delivery to CITY, become the property of CITY

9. Relationship of Parties. It is understood that the relationship of CONTRACTOR to the CITY is that of an independent contractor and all persons working for or under

9.f
January 26, 2026 Packet Pg. 128
Agreement Upgrade of Existing Tennis and Basketball Court Lighting at Burton and Highlands Parks, No. C2102 Page A-4
the direction of CONTRACTOR are its agents or employees and not agents or employees of the CITY.

10. Schedule. CONTRACTOR shall adhere to the schedule set forth in Exhibit A; provided, that CITY shall grant reasonable extensions of time for the delivery of products or performance of services occasioned by governmental reviews of CONTRACTOR’s work product or other unavoidable delays; provided, further, that such unavoidable delay shall not include strikes, lockouts, work stoppages, or other labor disturbances conducted by, or on behalf of, CONTRACTOR’s officers or employees.

CONTRACTOR acknowledges the importance to CITY of timely delivery of products or services and agrees to put forth its best professional efforts to perform in a manner consistent with that schedule.

11. Indemnity. CONTRACTOR hereby agrees to defend, indemnify, and save harmless CITY, its Council, boards, commissions, officers, attorneys, employees and agents, from and against any and all claims, suits, actions liability, loss, damage, expense, cost (including, without limitation, costs and fees of litigation) of every nature, kind or description, which may be brought against, or suffered or sustained by, CITY, its Council, boards, commissions, officers, attorneys, employees or agents caused by, or alleged to have been caused by, the negligence, intentional tortuous act or omission, or willful misconduct of CONTRACTOR, its officers, employees or agents in the performance of any services or work pursuant to this Agreement.

The duty of CONTRACTOR to indemnify and save harmless, as set forth herein, shall include the duty to defend as set forth in Section 2778 of the California Civil Code; provided, however, that nothing herein contained shall be construed to require CONTRACTOR to indemnify CITY and, its Council, boards, commissions, officers, attorneys, employees and agents against any responsibility or liability in contravention of Section 2782 of the California Civil Code.

12. Insurance. CONTRACTOR shall acquire and maintain Workers’ Compensation, employer’s liability, commercial general liability, owned and non-owned and hired automobile liability insurance coverage relating to CONTRACTOR’s services to be performed hereunder covering CITY’s risks in form subject to the approval of the City Attorney and/or CITY’s Risk Manager. The minimum amounts of coverage corresponding to the aforesaid categories of insurance per insurable event shall be as follows:

Insurance Category Minimum Limits
Workers’ Compensation statutory minimum
Employer’s Liability $1,000,000 per accident for bodily injury or disease. Contractor shall
submit to City a Waiver of
Subrogation endorsement in favor of
City, its officers, agents, employees,
and volunteers.

9.f
January 26, 2026 Packet Pg. 129
Agreement Upgrade of Existing Tennis and Basketball Court Lighting at Burton and Highlands Parks, No. C2102 Page A-5
Commercial General $2,000,000 per occurrence and
Liability $4,000,000 aggregate for bodily
injury, personal injury and property
damage. For Public Projects over
$175,000, the policy limits shall be
$5,000,000 per occurrence and
$10,000,000 aggregate for bodily
injury, personal injury and property
damage
Automobile Liability $2,000,000 per accident for bodily injury and property damage For
Public Projects over $175,000 these
policy limits shall be $5,000,000
(coverage required to the extent
applicable to
CONTRACTOR’s vehicle usage in
performing services hereunder)
Concurrently with the execution of this Agreement, CONTRACTOR shall furnish CITY with certificates and copies of information or declaration pages of the insurance required hereunder and, with respect to evidence of commercial general liability and automobile liability insurance coverage, original endorsements:
(a) Precluding cancellation or reduction in per occurrence limits before the expiration of thirty (30) days (10 days for nonpayment) after CITY shall have received written notification of cancellation in coverage or reduction in per occurrence limits by first class mail;
(b) Naming the CITY, its Council, officers, boards, commissions, attorneys, employees, and agents, as additional insureds; and
(c) Providing that CONTRACTOR’s insurance coverage shall be primary insurance with respect to CITY, its Council, officers, boards, commissions, attorneys, employees, and agents, and any insurance or self-insurance maintained by CITY for itself, its Council, officers, boards, commissions, employees, attorneys, or agents shall be in excess of CONTRACTOR’s insurance and not contributory with it.

Claims Made Policies
If any of the required policies provide claims-made coverage:

1. The Retroactive Date must be shown and must be before the date of the contract or the beginning of contract work.

2. Insurance must be maintained, and evidence of insurance must be provided for at least five (5) years after completion of the contract of work.

3. If coverage is canceled or non-renewed, and not replaced with another claims-made policy form with a Retroactive Date prior to the contract effective

9.f
January 26, 2026 Packet Pg. 130
Agreement Upgrade of Existing Tennis and Basketball Court Lighting at Burton and Highlands Parks, No. C2102 Page A-6
date, the CONTRACTOR must purchase “extended reporting” coverage for a minimum of five (5) years after completion of contract work.

Verification of Coverage
CONTRACTOR shall furnish the CITY with original certificates and amendatory endorsements effecting coverage required by this clause. All certificates and endorsements are to be received and approved by the CITY before work commences. However, failure to obtain the required documents prior to the work beginning shall not waive the CONTRACTOR’s obligation to provide them. The CITY reserves the right to require complete, certified copies of all required insurance policies, including endorsements required by these specifications, at any time.

Waiver of Subrogation
CONTRACTOR hereby grants to CITY a waiver of any right to subrogation which any insurer of said CONTRACTOR may acquire against the CITY by virtue of the payment of any loss under such insurance. This provision applies regardless of whether or not the CITY has requested or received a waiver of subrogation endorsement from the insurer.

Acceptability of Insurers
Insurance is to be placed with insurers with a current A.M. Best’s rating of no less than A:VII, unless otherwise acceptable to the City.

Special Risks or Circumstances
CITY reserves the right to modify these requirements, including limits, based on the nature of the risk, prior experience, insurer, coverage, or other special circumstances.

Coverage
It is a requirement under this agreement that any available insurance proceeds broader than or in excess of the specified minimum insurance coverage requirements and/or limits shall be made available to the Additional Insured and shall be (1) the minimum coverage and limits specified in this Agreement; or (2) the broader coverage and maximum limits of coverage of any insurance policy, whichever is greater.

CONTRACTOR shall maintain insurance as required by this contract to the fullest amount allowed by law and shall maintain insurance for a minimum of five years following completion of the project. In the event contractor fails to obtain or maintain completed operations coverage as required by this agreement, the city at its sole discretion may purchase the coverage required and the cost shall be paid by CONTRACTOR.

Primary and Non-Contributory Coverage
The Additional Insured coverage under the CONTRACTOR’s policy shall be “primary and non-contributory” as will not seek contribution from the CITY insurance or self-insurance and shall be at least as broad as CG 20 01 04 12.

Excess Insurance

9.f
January 26, 2026 Packet Pg. 131
Agreement Upgrade of Existing Tennis and Basketball Court Lighting at Burton and Highlands Parks, No. C2102 Page A-7
The limits of insurance required in this agreement may be satisfied by a combination of primary and umbrella or excess insurance. Any umbrella or excess insurance shall contain or be endorsed to contain a provision that such coverage shall also apply on a primary and noncontributory basis for the benefit of CITY before the CITY insurance or self-insurance shall be called upon to protect it as a named insured.

13. SUBCONTRACTORS. CONTRACTOR agrees to include with all subcontractors in their subcontracts the same requirements and provisions of this agreement including the indemnity and Insurance requirements to the extent they apply to the scope of the Subcontractors’ work. Subcontractors hired by CONTRACTOR agree to be bound to CONTRACTOR and CITY in the same manner and to the same extent as CONTRACTOR is bound to CITY under the Contract documents.

Subcontract shall agree to include these same provisions in any agreement with a sub-subcontractor. CONTRACTOR shall require all subcontractors to provide a valid certificate of insurance and the required endorsements included in the agreement prior to commencement of any work and will provide proof of compliance to the CITY.

Subcontractor shall agree to be bound to CONTRACTOR and CITY in the same manner and to the same extent as CONTRACTOR is bound to CITY under the Contract Documents. Subcontractor shall further agree to include the same requirements and provisions of this agreement, including the indemnity and Insurance requirements, with a Sub-subcontractor to the extent they apply to the scope of the Sub-subcontractors’ work. A copy of the CITY Contract Document Indemnity and Insurance provisions shall be furnished to the subcontractor upon request.

14. WORKERS' COMPENSATION. CONTRACTOR certifies that he/she/it is aware of the provisions of the Labor Code of the State of California which require every employer to be insured against liability for workers' compensation or to undertake self-insurance in accordance with the provisions of that Code, and CONTRACTOR certifies that he will comply with such provisions before commencing the performance of the work of this agreement.

15. NON-DISCRIMINATION. The CONTRACTOR will not discriminate against any employee or applicant for employment because of race, color, religion, sex or national origin. The CONTRACTOR will take affirmative action to insure that applicants are employed and the employees are treated during employment without regard to their race, color, religion, sex or national origin. Such action shall include, but not be limited to the following: employment, advancement, demotion, transfer, recruitment, or recruitment advertising, layoff or termination, rates of pay or other forms of compensation, and selection for training, including apprenticeship. The CONTRACTOR shall at all times be in compliance with the requirements of the Federal Americans With Disabilities Act (Public Law 101-336) which prohibits discrimination on the basis of disability by public entities. The CONTRACTOR agrees to post in conspicuous places available to employees and applicants for employment any notices provided by the CITY setting forth the provisions of this non-discrimination clause.

9.f
January 26, 2026 Packet Pg. 132
Agreement Upgrade of Existing Tennis and Basketball Court Lighting at Burton and Highlands Parks, No. C2102 Page A-8

16. Notice. All notices required by this Agreement shall be given to the CITY and CONTRACTOR in writing, by first class mail, postage prepaid, addressed as follows:

CITY: City of San Carlos
600 Elm Street
San Carlos, CA 94070
Attention: City Manager
CONTRACTOR: _____________________
Address
Phone
Attention: ______________

17. Non-Assignment. This Agreement is not assignable either in whole or in part.

18. Amendments. This Agreement may be amended or modified only by written agreement signed by both parties.

19. Business Registration. CONTRACTOR agrees to comply with Chapter 5.04 of the Municipal Code and pay all fees required to be paid.

20. Validity. The invalidity in whole or in part of any provision of this Agreement shall not void or affect the validity of any other provision of this Agreement.

21. Governing Law. This Agreement shall be governed by the laws of the State of California and any suit or action initiated by either party shall be brought in the County of San Mateo, California. In the event of litigation between the parties hereto to enforce any provision of the Agreement, the unsuccessful party will pay the reasonable attorney’s fees and expenses of litigation of the successful party.

22. Mediation. Should any dispute arise out of this Agreement, the parties shall meet in mediation and attempt to reach a resolution with the assistance of a mutually acceptable mediator. Neither party shall be permitted to file legal action without first meeting in mediation and making a good faith attempt to reach a mediated resolution. The costs of the mediator, if any, shall be paid equally by the parties.

If a mediated settlement is reached neither party shall be deemed the prevailing party for purposes of the settlement and each party shall bear its own legal costs.

If a party refuses or fails to participate in mediation in good faith prior to filing a lawsuit, then that party shall be barred from recovery of attorney’s fees and costs of suit.

23. Conflict of Interest. CONTRACTOR may serve other clients, but none who are active within the City of San Carlos or who conduct business that would place CONTRACTOR in a "conflict of interest" as that term is defined in State law.

24. Entire Agreement. Each party acknowledges that this agreement, the exhibits hereto, and the documents incorporated by reference herein constitute the complete agreement and exclusive statement of the terms and conditions between the parties, which supersedes and merges all prior proposals, understandings and all other agreements, verbal and written, between the parties relating to the subject

9.f
January 26, 2026 Packet Pg. 133
Agreement Upgrade of Existing Tennis and Basketball Court Lighting at Burton and Highlands Parks, No. C2102 Page A-9
matter of this agreement. This agreement may not be modified or altered except by written instrument duly executed by both parties.
[SIGNATURE PAGE TO FOLLOW]

9.f
January 26, 2026 Packet Pg. 134
Agreement Upgrade of Existing Tennis and Basketball Court Lighting at Burton and Highlands Parks, No. C2102 Page A-10

SIGNATURE PAGE
IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed on the date first above written by their respective officers duly authorized in that behalf.

CITY OF SAN CARLOS:

Dated: _________________________________
Jeff Maltbie, City Manager
ATTEST:

Dated: ________________________________
Crystal Mui, City Clerk
APPROVED AS TO FORM:

Dated:

Gregory J. Rubens, City Attorney
CONSULTANT/CONTRACTOR/VENDOR:

I acknowledge that I have full authority to execute this agreement on behalf of the Consultant/Contractor/Vendor, and have read, understand, and agree to comply with the provisions of this Agreement, including the Insurance and indemnity requirements set forth herein.

Dated:

9.f
January 26, 2026 Packet Pg. 135
Agreement Upgrade of Existing Tennis and Basketball Court Lighting at Burton and Highlands Parks, No. C2102 Page A-11

EXHIBIT A
CONTRACTOR’S BID PROPOSAL
[This page to be used for other Exhibits to add on, if any]

9.f
January 26, 2026 Packet Pg. 136
Agreement Upgrade of Existing Tennis and Basketball Court Lighting at Burton and Highlands Parks, No. C2102 Page A-12

RESOLUTION OF CONSTRUCTION CLAIMS
Any public works claims arising under this contract which the Contractor wishes to assert against the Governing Agency shall be governed by California Public Contract Code Section 9204.

Claims which do not exceed three hundred seventy-five thousand dollars ($375,000) are also subject to the provisions of Article 1.5 of the California Public Contract Code (commencing with Section 20104). Pursuant to California Public Contracts Code Section 9204, claims shall be resolved as follows:
(d) (1) (A) Upon receipt of a claim pursuant to this section, the public entity to which the claim applies shall conduct a reasonable review of the claim and, within a period not to exceed 45 days, shall provide the claimant a written statement identifying what portion of the claim is disputed and what portion is undisputed. Upon receipt of a claim, a public entity and a contractor may, by mutual agreement, extend the time period provided in this subdivision. (B) The claimant shall furnish reasonable documentation to support the claim. (C) If the public entity needs approval from its governing body to provide the claimant a written statement identifying the disputed portion and the undisputed portion of the claim, and the governing body does not meet within the 45 days or within the mutually agreed to extension of time following receipt of a claim sent by registered mail or certified mail, return receipt requested, the public entity shall have up to three days following the next duly publicly noticed meeting of the governing body after the 45-day period, or extension, expires to provide the claimant a written statement identifying the disputed portion and the undisputed portion. (D) Any payment due on an undisputed portion of the claim shall be processed and made within 60 days after the public entity issues its written statement. If the public entity fails to issue a written statement, paragraph (3) shall apply.
(2) (A) If the claimant disputes the public entity’s written response, or if the public entity fails to respond to a claim issued pursuant to this section within the time prescribed, the claimant may demand in writing an informal conference to meet and confer for settlement of the issues in dispute. Upon receipt of a demand in writing sent by registered mail or certified mail, return receipt requested, the public entity shall schedule a meet and confer conference within 30 days for settlement of the dispute.
(B) Within 10 business days following the conclusion of the meet and confer conference, if the claim or any portion of the claim remains in dispute, the public entity shall provide the claimant a written statement identifying the portion of the claim that remains in dispute and the portion that is undisputed. Any payment due on an undisputed portion of the claim shall be processed and made within 60 days after the public entity issues its written statement. Any disputed portion of the claim, as identified by the contractor in writing, shall be submitted to nonbinding mediation, with the public entity and the claimant sharing the associated costs equally. The public entity and claimant shall mutually agree to a mediator within 10 business days after the disputed portion of the claim has been identified in writing. If the parties cannot agree upon a mediator, each party shall select a mediator and those mediators shall select a qualified neutral third party to mediate with regard to the disputed portion of the claim. Each party shall bear the fees and costs charged by its respective mediator in connection with the selection of the neutral mediator. If mediation is unsuccessful, the parts of the claim remaining in dispute shall be subject to applicable procedures outside this section.

9.f
January 26, 2026 Packet Pg. 137
Agreement Upgrade of Existing Tennis and Basketball Court Lighting at Burton and Highlands Parks, No. C2102 Page A-13
(C) For purposes of this section, mediation includes any nonbinding process, including, but not limited to, neutral evaluation or a dispute review board, in which an independent third party or board assists the parties in dispute resolution through negotiation or by issuance of an evaluation.

Any mediation utilized shall conform to the timeframes in this section. (D) Unless otherwise agreed to by the public entity and the contractor in writing, the mediation conducted pursuant to this section shall excuse any further obligation under Section 20104.4 to mediate after litigation has been commenced.
(E) This section does not preclude a public entity from requiring arbitration of disputes under private arbitration or the Public Works Contract Arbitration Program, if mediation under this section does not resolve the parties’ dispute.
(3) Failure by the public entity to respond to a claim from a contractor within the time periods described in this subdivision or to otherwise meet the time requirements of this section shall result in the claim being deemed rejected in its entirety. A claim that is denied by reason of the public entity’s failure to have responded to a claim, or its failure to otherwise meet the time requirements of this section, shall not constitute an adverse finding with regard to the merits of the claim or the responsibility or qualifications of the claimant.
(4) Amounts not paid in a timely manner as required by this section shall bear interest at 7 percent per annum.
(5) If a subcontractor or a lower tier subcontractor lacks legal standing to assert a claim against a public entity because privity of contract does not exist, the contractor may present to the public entity a claim on behalf of a subcontractor or lower tier subcontractor. A subcontractor may request in writing, either on his or her own behalf or on behalf of a lower tier subcontractor, that the contractor present a claim for work which was performed by the subcontractor or by a lower tier subcontractor on behalf of the subcontractor. The subcontractor requesting that the claim be presented to the public entity shall furnish reasonable documentation to support the claim. Within 45 days of receipt of this written request, the contractor shall notify the subcontractor in writing as to whether the contractor presented the claim to the public entity and, if the original contractor did not present the claim, provide the subcontractor with a statement of the reasons for not having done so.

A waiver of the rights granted by this section is void and contrary to public policy, provided, however, that (1) upon receipt of a claim, the parties may mutually agree to waive, in writing, mediation and proceed directly to the commencement of a civil action or binding arbitration, as applicable; and (2) a public entity may prescribe reasonable change order, claim, and dispute resolution procedures and requirements in addition to the provisions of this section, so long as the contractual provisions do not conflict with or otherwise impair the timeframes and procedures set forth in this section.

Nothing in this section shall impose liability upon a public entity that makes loans or grants available through a competitive application process, for the failure of an awardee to meet its contractual obligations.

9.f
January 26, 2026 Packet Pg. 138
Agreement Upgrade of Existing Tennis and Basketball Court Lighting at Burton and Highlands Parks, No. C2102 Page A-14

PAYMENT BOND
KNOW ALL MEN BY THESE PRESENTS, that
WHEREAS, The City of San Carlos (hereinafter referred to as “Owner”) and (hereinafter referred to as “Principal”) have entered into a contract for the construction of Upgrade of Existing Tennis and Basketball Court Lighting at Burton and Highlands Parks Project No. C2102 and
WHEREAS, under the terms of said contract Principal is required to furnish a bond securing payment of the claims to which reference is made in Section 3248 of the Civil Code; NOW, THEREFORE, we, the Principal, and
, as Surety, are held and firmly bound unto the
“Owner” in the penal sum of
/100 Dollars ($ )
lawful money of the United States, being not less than one hundred percent (100%) of the amount payable by the terms of the contract, for the payment of which sum well and truly to be made we bind ourselves, our heirs, executors, administrators and successors, jointly and severally, firmly by these presents.

The condition of this obligation is such that if said Principal or any of its subcontractors fails to pay any of the persons named in Section 3181 of the Civil Code, or amounts due under the Unemployment Insurance Code with respect to work or labor performed under the contract, or for any amounts required to be deducted, withheld, and paid over to the Franchise Tax Board from the wages of employees of the Principal or its subcontractors pursuant to Section 18806 of the Revenue and Taxation Code, with respect to such work and labor that the Surety will pay for the same, in an amount not exceeding the amount hereinabove set forth and also will pay, in case suit is brought upon this bond, a reasonable attorney’s fee, to be fixed by the court. We hereby state and confirm that we are a “California admitted insurer” as defined by the California Department of Insurance.

This bond shall inure to the benefit of any of the persons named in Section 3181 of the Civil Code so as to give a right of action to such persons or their assigns in any suit brought upon this bond.

This bond is given to comply with Sections 3247 and 3248 of the Civil Code. The liability of the Principal and Surety hereunder is governed by the provisions of said Code, all acts amendatory thereof, and all other statutes referred to therein, including Section 3225 of the Civil Code.

The Surety hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the contract or to the work to be performed there under or the specifications accompanying the same shall in any ways affect its obligation on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the contract or to the work or to the specifications.

9.f
January 26, 2026 Packet Pg. 139
Agreement Upgrade of Existing Tennis and Basketball Court Lighting at Burton and Highlands Parks, No. C2102 Page A-15
IN WITNESS WHEREOF, the above bounded parties have executed this instrument under their seals this _________ day of __________________, 20 , the name and corporate seal of each corporate body being hereto affixed and these presents duly signed by its undersigned representative, pursuant to authority of its governing body.

(Principal)
NOTE: By
To be signed by By
Principal and Surety
and acknowledgment
and notarial seal
(Surety)
By
By

9.f
January 26, 2026 Packet Pg. 140
Agreement Upgrade of Existing Tennis and Basketball Court Lighting at Burton and Highlands Parks, No. C2102 Page A-16

PERFORMANCE BOND
KNOW ALL MEN BY THESE PRESENTS, that
WHEREAS, The City of San Carlos (hereinafter referred to as “Owner”) has entered into a contract with _ ___________________ (hereinafter referred to as “Principal”) for the construction of Upgrade of Existing Tennis and Basketball Court Lighting at Burton and Highlands Parks, No. C2102, and
WHEREAS, said Principal is required under the terms of said contract to furnish a bond of faithful performance of said Contract;
NOW, THEREFORE, we, the Principal, and
, as Surety, are held and firmly bound unto the
“Owner” in the penal sum of ______________________________/100 Dollars($ ) lawful money of the United States, being a sum equal to the total amount payable under the contract, for the payment of which sum, well and truly to be made, we bind ourselves, our heirs, executors, administrators and successors, jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION IS SUCH that if the above bounded Principal shall in all things stand to and abide by and well and truly keep and perform the covenants, conditions and agreements in the said contract and any alteration thereof made as therein provided, on his part to be kept and performed at the time and in the manner therein specified, and in all respects according to their true intent and meaning, as therein stipulated, then this obligation shall become null and void; otherwise it shall be and remain in full force and virtue.

As a condition precedent to satisfactory completion of the said contract, the above obligations to the amount of and-00/100 Dollars ($ ) being not less than ten percent (10%) of the total amount payable under the contract, shall hold good for a period of two (2) years after the completion and acceptance of said work, during which time if the above Principal shall fail to make full, complete and satisfactory repair and replacement or totally protect the “Owner” from loss or damage made evident during said period of two (2) years from the date of acceptance of said work, and resulting from or caused by defective materials or faulty workmanship in the prosecution of the work done, the above obligations in the said sum of and-00/100 Dollars ($ ) shall remain in full force and virtue; otherwise the above obligation shall be void.

And the said Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Contract or to the work to be performed there under of the Specifications accompanying the same shall in any ways affect its obligations on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the contract or to the work or to the Specifications. We hereby state and confirm that we are a “California admitted insurer” as defined by the California Department of Insurance.

9.f
January 26, 2026 Packet Pg. 141
Agreement Upgrade of Existing Tennis and Basketball Court Lighting at Burton and Highlands Parks, No. C2102 Page A-17
In the event that the “Owner” or its successors or assigns, shall be the prevailing party in an action brought upon this bond, then, in addition to the penal sum hereinabove specified, we agree to pay to the “Owner” for its successors or assigns, a reasonable sum on account of attorney’s fees in such action, which sum shall be fixed by the court.

IN WITNESS WHEREOF, the above bounded parties have executed this instrument under their seals this _________ day of __________________, 20 , the name and corporate seal of each corporate party being hereto affixed and these presents duly signed by its undersigned representative, pursuant to the authority of its governing body.

(Principal)
NOTE: By
To be signed by By
Principal and Surety
and acknowledgment
and notarial seal
(Surety)
By
By

9.f
January 26, 2026 Packet Pg. 142
Agreement Upgrade of Existing Tennis and Basketball Court Lighting at Burton and Highlands Parks, No. C2102 Page A-18

WORKERS' COMPENSATION CERTIFICATION
Labor Code Section 1861
The Bidder hereby certifies as follows:
"I am aware of the provisions of Section 3700 of the Labor Code, which requires every employer to be insured against liability for Workers' Compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions and furnish proof of said insurance before commencing the performance of the work of this contract."

Name of Contractor

Signature of Contractor Representative
Dated: __________________________
NOTE: THIS CERTIFICATION MUST BE COMPLETED AND RETURNED BY THE SUCCESSFUL BIDDER PRIOR TO THE START OF CONSTRUCTION.

9.f
January 26, 2026 Packet Pg. 143
Agreement Upgrade of Existing Tennis and Basketball Court Lighting at Burton and Highlands Parks, No. C2102 Page A-19

CERTIFICATION OF SAFETY REQUIREMENTS FOR

CONTRACTORS AND VENDORS
California Code of Regulations, Title 8, Section 1509
To work as a contractor or vendor with the City of San Carlos, your organization is required to certify that it has an active on-the-job written Injury and Illness Prevention Program. This program is essential to make the job as accident-free as possible and to comply with Federal and State Safety Standards.

The undersigned hereby certifies that his/her organization has an active written Injury and Illness Prevention Program, as required by Cal-OSHA under California Code of Regulations, Title 8, General Industry Safety Orders, Section 3203 and/or Construction Safety Orders, Section 1509, that ensures compliance with, and enforcement of, current minimum Cal-OSHA Safety Standards, and that his/her organization has knowledge of these standards that are applicable to the job operations. This includes a program for ensuring employees have been trained to recognize hazards of their job.

The undersigned also hereby certifies that his/her organization has an active written Hazard Communication Program with evidence that all employees have been trained in safe use and handling of chemicals on the job site, and a file will be made available for review by the City of San Carlos of each Material Safety Data Sheet (MSDS) on those chemicals kept on the site.

Name of Contractor

Signature of Contractor Representative
Dated: __________________________
NOTE: THIS CERTIFICATION MUST BE COMPLETED AND RETURNED BY THE SUCCESSFUL BIDDER PRIOR TO THE START OF CONSTRUCTION.

9.f
January 26, 2026 Packet Pg. 144
Agreement Upgrade of Existing Tennis and Basketball Court Lighting at Burton and Highlands Parks, No. C2102 Page A-20

DRUG-FREE WORKPLACE CERTIFICATION
The bidder_________________________________________________________________, hereby certifies compliance with Government Code Section 8355 in matters relating to providing a drug-free workplace. The contractor will:

1. Publish a statement notifying employees that unlawful manufacture, distribution, dispensation, possession, or use of a controlled substance is prohibited and specifying actions to be taken against employees for violations, as required by Government Code Section 8355(a).

2. Establish a Drug-Free Awareness Program as required by Government Code Section 8355(b), to inform employees about all of the following:
(a) The dangers of drug abuse in the workplace,
(b) The person’s or organization’s policy of maintaining a drug-free workplace, (c) Any available counseling, rehabilitation and employee assistance programs, and (d) Penalties that may be imposed upon employees for drug abuse violations.

3. Provide as required by Government Code Section 8355(c), that every employee who works on the proposed contract or loan:
(a) Will receive a copy of the company’s drug-free policy statement, and (b) Will agree to abide by the terms of the company’s statement as a condition of employment on the contract or loan.

I, the official named below, hereby swear that I am duly authorized legally to bind the contractor to the above described certification. I am fully aware that this certification, executed on the date below, is made under penalty of perjury under the laws of the State of California.

Dated:_______________________, 20____.
________________________________
Contractor’s Signature
NOTE: THIS CERTIFICATION MUST BE COMPLETED AND RETURNED BY THE SUCCESSFUL BIDDER PRIOR TO THE START OF CONSTRUCTION.

9.f
January 26, 2026 Packet Pg. 145
Agreement Upgrade of Existing Tennis and Basketball Court Lighting at Burton and Highlands Parks, No. C2102 Page A-21
ESCROW AGREEMENT FOR SECURITY DEPOSITS IN LIEU OF RETENTION (Optional) Public Contract Code Section 22300
This Escrow Agreement is made and entered into by and between _______________________________ whose address is __________________________________________________ hereinafter called "Owner,"________________________________ whose address is ______________________________
____________________hereinafter called "Contractor" and ____________________________________ whose address is __________________________________________ hereinafter called "Escrow Agent." For the consideration hereinafter set forth, the Owner, Contractor, and Escrow Agent agree as follows:
(1) Pursuant to Section 22300 of the Public Contract Code of the State of California, Contractor has the option to deposit securities with Escrow Agent as a substitute for retention earnings required to be withheld by Owner pursuant to the Construction Contract entered into between the Owner and Contractor for __________________ in the amount of _______________ dated __________ (hereinafter referred to as the "Contract"). Alternatively, on written request of the Contractor, the Owner shall make payments of the retention earnings directly to the Escrow Agent. When the Contractor deposits the securities as a substitute for Contract earnings, the Escrow Agent shall notify the Owner within 10 days of the deposit. The market value of the securities at the time of the substitution shall be at least equal to the cash amount then required to be withheld as retention under the terms of the Contract between the Owner and Contractor. Securities shall be held in the name of ____________________, and shall designate the Contractor as the beneficial owner. (2) The Owner shall make progress payments to the Contractor for those funds which otherwise would be withheld
from progress payments pursuant to the Contract provisions, provided that the Escrow Agent holds securities in the form and amount specified above.
(3) When the Owner makes payment of retentions earned directly to the Escrow Agent, the Escrow Agent shall hold them for the benefit of the Contractor until the time that the escrow created under this contract is terminated.

The Contractor may direct the investment of the payments into securities. All terms and conditions of this agreement and the rights and responsibilities of the parties shall be equally applicable and binding when the Owner pays the Escrow Agent directly.
(4) Contractor shall be responsible for paying all fees for the expenses incurred by Escrow Agent in administering the Escrow Account and all expenses of the Owner. These expenses and payment terms shall be determined by the Owner, Contractor, and Escrow Agent.
(5) The interest earned on the securities or the money market accounts held in escrow and all interest earned on that interest shall be for the sole account of Contractor and shall be subject to withdrawal by Contractor at any time and from time to time without notice to the Owner. (6) Contractor shall have the right to withdraw all or any part of the principal in the Escrow Account only by written notice to Escrow Agent accompanied by written authorization from the Owner to the Escrow Agent that Owner consents to the withdrawal of the amount sought to be withdrawn by Contractor. (7) The Owner shall have a right to draw upon the securities in the event of default by the Contractor. Upon seven (7) days written notice to the Escrow Agent from the owner of the default, the Escrow Agent shall immediately convert the securities to cash and shall distribute the cash as instructed by the Owner.

9.f
January 26, 2026 Packet Pg. 146
Agreement Upgrade of Existing Tennis and Basketball Court Lighting at Burton and Highlands Parks, No. C2102 Page A-22
(8) Upon receipt of written notification from the Owner certifying that the Contract is final and complete, and that the Contractor has complied with all requirements and procedures applicable to the Contract, Escrow Agent shall release to Contractor all securities and interest on deposit less escrow fees and charges of the Escrow Account.

The escrow shall be closed immediately upon disbursement of all moneys and securities on deposit and payments of fees and charges.
(9) Escrow Agent shall rely on the written notifications from the Owner and the Contractor pursuant to Sections (5) to (8), inclusive, of this agreement and the Owner and Contractor shall hold Escrow Agent harmless from Escrow Agent's release and disbursement of the securities and interest as set forth above. (10) The names of the persons who are authorized to give written notice or to receive written notice on behalf of the Owner and on behalf of Contractor in connection with the foregoing, and exemplars of their respective signatures are as follows:

On behalf of Owner: On behalf of Contractor: On behalf of Escrow Agent:
___________________________ ___________________________ _______________________________ Title Title Title
___________________________ ___________________________ _______________________________ Name Name Name
___________________________ ___________________________ _______________________________ Signature Signature Signature
___________________________ ___________________________ _______________________________ Address Address Address
At the time the Escrow Account is opened, the Owner and Contractor shall deliver to the Escrow Agent a fully executed counterpart of this Agreement.

IN WITNESS WHEREOF, the parties have executed this Agreement by their proper officers on the date first set forth above.

Owner: Contractor:
______________________________ ___________________________________ Title Title
______________________________ ___________________________________ Name Name
______________________________ ___________________________________ Signature Signature

9.f
January 26, 2026 Packet Pg. 147
Agreement Upgrade of Existing Tennis and Basketball Court Lighting at Burton and Highlands Parks, No. C2102 Page A-23

GUARANTEE
(To Be Submitted Prior to Project Acceptance)

FOR THE
City of San Carlos
San Carlos, CA 94070
Upgrade of Existing Tennis and Basketball Court Lighting at Burton and Highlands Parks Project No. C2102
We hereby guarantee that the work we have installed for the above named project has been done in accordance with the Plans and Specifications and that the work installed will fulfill the requirements of the guarantee.

We agree to repair or replace any or all of our work, together with any other adjacent work which may be displayed in so doing that may prove to be defective in its workmanship or material within a period of two (2) years from the date of acceptance of the above-named work by the City of San Carlos, without any expense whatsoever to the City of San Carlos, ordinary wear and tear and unusual abuse or neglect excepted.

Within fifteen (15) days after being notified in writing by the City of San Carlos of any defects in the work, we agree to commence and prosecute with due diligence all work necessary to fulfill the terms of this guarantee, and to complete the work within a reasonable period of time, and in the event of our failure to so comply, we collectively and separately, do hereby authorize said City of San Carlos to proceed to have such work done at our expense and we will honor and pay the cost and changes therefore upon demand.

Dated:

By:

NOTE: THIS CERTIFICATION MUST BE COMPLETED AND RETURNED BY THE SUCCESSFUL BIDDER PRIOR TO PROJECT ACCEPTANCE.

9.f
January 26, 2026 Packet Pg. 148

GENERAL PROVISIONS

9.f
January 26, 2026 Packet Pg. 149
This Page Intentionally Left Blank

9.f
January 26, 2026 Packet Pg. 150

TABLE OF CONTENTS
SECTION 1 – TERMS AND DEFINITIONS

1.01 Terms ................................................................................................................................ 1

1.02 Definitions .......................................................................................................................... 1 SECTION 2 – PROPOSAL REQUIREMENTS AND CONDITIONS

2.01 General .............................................................................................................................. 6

2.02 Proposal Forms ................................................................................................................. 6

2.03 Qualifications of Bidders .................................................................................................... 6

2.04 Rejection of Proposals Containing Alterations, Erasures, or Irregularities ........................ 6

2.05 Submission of Bids ............................................................................................................ 6

2.06 Approximate Estimate ....................................................................................................... 7

2.07 Examination of Plans, Specifications and Work Site ......................................................... 7

2.08 Withdrawal of Proposals .................................................................................................... 7

2.09 Proposal Guarantee .......................................................................................................... 7

2.10 Disqualification of Bidders ................................................................................................. 7

2.11 Bid Protest Procedures ..................................................................................................... 7

2.12 List of Subcontractors ........................................................................................................ 8

2.13 Required Contractor and Subcontractor Registration ....................................................... 8 SECTION 3 – REVIEW OF BIDS, CONTRACT AWARD AND EXECUTION

3.01 Public Bid Opening and Initial Review ............................................................................... 9

3.02 Determination of Lowest Responsible Bidder ................................................................... 9

3.03 Notice of Award ................................................................................................................. 10

3.04 Contract Execution ............................................................................................................ 10

3.05 Status of Contractor .......................................................................................................... 10

3.06 Assignment ........................................................................................................................ 10

3.07 Recognition of Subcontractors .......................................................................................... 10

3.08 Return of Bid Security ....................................................................................................... 10

3.09 Forfeiture of Proposal Guarantee ...................................................................................... 11

3.10 Contract Bonds .................................................................................................................. 11

3.11 Notification of Surety Companies ...................................................................................... 12

3.12 Power of Attorney .............................................................................................................. 12

3.13 Insurance Requirements ................................................................................................... 12

3.14 Special Requirements ....................................................................................................... 12

3.15 Builders Risk Insurance ..................................................................................................... 13

3.16 Certificates ........................................................................................................................ 13

3.17 Legal Address of Contractor .............................................................................................. 13

3.18 Office of Contractor at Site ................................................................................................ 13 SECTION 4 – SCOPE AND CONTROL OF THE WORK

4.01 Work to be Done ............................................................................................................... 14

4.02 Plans and Specifications ................................................................................................... 14

4.03 Reference to Standards and Codes .................................................................................. 14

4.04 Authority of the Engineer ................................................................................................... 15

4.05 Contract Documents and Precedence .............................................................................. 15

4.06 Interpretation of Specifications and Drawings ................................................................... 15

4.07 Figured Dimensions .......................................................................................................... 15

4.08 Errors or Discrepancies ..................................................................................................... 16

4.09 Drawings to be Furnished by Contractor ........................................................................... 16

4.10 Additional Drawings by City ............................................................................................... 16

4.11 Lines and Grades .............................................................................................................. 16

4.12 Record Documents ............................................................................................................ 16

4.13 Record Drawings ............................................................................................................... 16

4.14 Reuse of Documents ......................................................................................................... 17

4.15 Subsurface Data ................................................................................................................ 17

4.16 Right-of-Way ..................................................................................................................... 17

4.17 Removal of Defective and Unauthorized Work ................................................................. 17

4.18 Acceptance of Defective Work .......................................................................................... 17

9.f
January 26, 2026 Packet Pg. 151

4.19 Submittals .......................................................................................................................... 17

4.20 Substitutions ...................................................................................................................... 18

4.21 Construction Staking Lines and Grades ............................................................................ 19

4.12 Inspection of the Work ....................................................................................................... 19

4.23 Testing ............................................................................................................................... 19 SECTION 5 – CHANGES IN WORK

5.01 Limited City Authority to Approve Change Orders ............................................................ 21

5.02 Contractor Liability for Unapproved Change Orders ......................................................... 21

5.03 Non-Material Change Requests by the Contractor ........................................................... 21

5.04 Effect of Extension of Time ............................................................................................... 21

5.05 Letters of Instruction .......................................................................................................... 21

5.06 Requests for Information, Inconsistencies and Changed Conditions ................................ 21

5.07 Extra and Omitted Work .................................................................................................... 22

5.08 Change Orders .................................................................................................................. 22

5.09 Disputed Work ................................................................................................................... 24 SECTION 6 – CONTROL OF MATERIALS

6.01 Materials and Workmanship .............................................................................................. 25

6.02 Protection of Work and Materials ...................................................................................... 25

6.03 Trade Names or Equals .................................................................................................... 25

6.04 Inspection of Materials by City .......................................................................................... 26

6.05 Inspection of Materials by Others ...................................................................................... 26

6.06 Tests of Materials .............................................................................................................. 26

6.07 Certification ....................................................................................................................... 26

6.08 Weighing and Metering Equipment ................................................................................... 26

6.09 Calibration of Testing Equipment ...................................................................................... 27 SECTION 7 – UTILITIES

7.01 City’s Statutory Obligation ................................................................................................. 28

7.02 Contractor’s Obligation to Identify and Protect Subsurface Infrastructure ........................ 28

7.03 Location ............................................................................................................................. 28

7.04 Protection .......................................................................................................................... 29

7.05 Shut Down Notification ...................................................................................................... 29

7.06 Removal ............................................................................................................................ 29

7.07 Relocation ......................................................................................................................... 29

7.08 Delays ............................................................................................................................... 30

7.09 Cooperation ....................................................................................................................... 30 SECTION 8 – PROSECUTION AND PROGRESS

8.01 Notice to Proceed .............................................................................................................. 31

8.02 Commencement of Work ................................................................................................... 31

8.03 Subcontracting .................................................................................................................. 31

8.04 Administrative Duties ......................................................................................................... 31

8.05 Baseline Construction Schedule ....................................................................................... 31

8.06 Three-Week Look Ahead Schedule .................................................................................. 31

8.07 Construction Sequence ..................................................................................................... 32

8.08 Recording Existing Conditions .......................................................................................... 32

8.09 Preconstruction Conference .............................................................................................. 32

8.10 Progress Meeting .............................................................................................................. 32

8.11 Hours of Construction ........................................................................................................ 32

8.12 Prosecution of Work .......................................................................................................... 32

8.13 Suspension of Work .......................................................................................................... 33

8.14 Default by the Contractor and Termination of Control ....................................................... 33

8.15 Contractor’s Right to Stop Work or Terminate Contract .................................................... 34

8.16 City’s Right to Terminate Contract .................................................................................... 34

8.17 Time of Completion and Days Charged ............................................................................ 35

8.18 Liquidated Damages ......................................................................................................... 35

8.19 Delays and Extension of Time ........................................................................................... 36

8.20 Substantial Completion ..................................................................................................... 38

8.21 Project Closeout ................................................................................................................ 38

9.f
January 26, 2026 Packet Pg. 152

8.22 Final Completion ............................................................................................................... 38

8.23 Final Acceptance ............................................................................................................... 39

8.24 Risk of Loss ....................................................................................................................... 39

8.25 Use of Improvements During Construction ...................................................................... 39 SECTION 9 – RESPONSIBILITIES OF THE CONTRACTOR

9.01 Contractor’s Responsibility for the Work ........................................................................... 40

9.02 Contractor’s Responsibility for Subcontracted Work ......................................................... 40

9.03 Superintendent .................................................................................................................. 40

9.04 Character of Workers ........................................................................................................ 40

9.05 Laws to be Observed ........................................................................................................ 40

9.06 Permits and Fees .............................................................................................................. 42

9.07 Coordination and Cooperation .......................................................................................... 42

9.08 Use of Premises ................................................................................................................ 43

9.09 Construction Staging and Field Office ............................................................................... 43

9.10 Site Security ...................................................................................................................... 44

9.11 Construction Water ............................................................................................................ 44

9.12 Project Site Maintenance .................................................................................................. 44

9.13 Preservation of Property .................................................................................................... 46

9.14 Protection of Buried Utilities .............................................................................................. 47

9.15 Protection of Bridges ......................................................................................................... 47

9.16 Protection of Traffic Signal Facilities ................................................................................. 47

9.17 Restoration of Adjacent and Existing Improvements ......................................................... 48

9.18 Archeological Remains ...................................................................................................... 48

9.19 Access to Private Property ................................................................................................ 48

9.20 Traffic Control and Public Convenience ............................................................................ 48

9.21 Safety ................................................................................................................................ 51

9.22 Patent Fees or Royalties ................................................................................................... 53

9.23 Advertising ......................................................................................................................... 53

9.24 Antitrust Claims ................................................................................................................. 53

9.25 Audit and Examination of Records .................................................................................... 53

9.26 Notice of Entrance ............................................................................................................. 54

9.27 Additional and Emergency Protection ............................................................................... 54

9.28 Placing Portions of Work in Service .................................................................................. 54

9.29 Rights of Way .................................................................................................................... 54 SECTION 10 – MEASUREMENT AND PAYMENT

10.01 Measurement of Quantities for Unit Price Work ................................................................ 55

10.02 Bid Items ........................................................................................................................... 55

10.03 Bid Quantities .................................................................................................................... 55

10.04 Progress Payments ........................................................................................................... 56

10.05 Retentions ......................................................................................................................... 57

10.06 Final Payment ................................................................................................................... 58

10.07 Acceptance ........................................................................................................................ 59

10.08 Compensation for Extra Work Omitted .............................................................................. 59

10.09 Compensation to City for Extension of Time ..................................................................... 59

10.10 Claims ............................................................................................................................... 59

10.11 Time Limit on Claims ......................................................................................................... 59

10.12 City Response to Claims ................................................................................................... 60

10.13 Appeal of Engineer’s Decision .......................................................................................... 60 SECTION 11 – GUARANTEE

11.01 Contractor’s Guarantee ..................................................................................................... 61

11.02 Correction of Defective Work During the Guarantee Period ............................................. 61 * * *

9.f
January 26, 2026 Packet Pg. 153
GP-1

GENERAL PROVISIONS
SECTION 1 – TERMS AND DEFINITIONS

1.01 Terms – Unless otherwise stated, the words “directed, required, permitted, ordered, instructed, designated, considered necessary, prescribed, approved, acceptable, satisfactory,” or words of like meaning, refer to actions, expressions, and prerogatives of the Engineer.

1.02 Definitions – Except as amended or supplemented, whenever in the Contract Documents the following terms are used, the intent and meaning shall be interpreted as follows:

Agreement - The written contract documents between the City and the Contractor covering the performance of the work.

As Shown, As Indicated, As Detailed - Where these words or words of similar import, are used, it shall be understood that reference to the drawings accompanying these specifications is made unless stated otherwise. Where "As Directed", "As Permitted", "Approved", or words of similar import, are used, it shall be understood that the direction, requirements, permission, approval, or acceptance of the Engineer is intended unless stated otherwise. As used herein, "Provide" shall be understood to mean "Provide Complete in Place" that is, "Furnish and Install”, and "Install" shall mean the installation complete in place of an item of equipment furnished by the City.

ASTM - American Society for Testing and Materials specifications.

AWWA - American Water Works Association and its Standard Specifications.

Addenda - Written or graphic instruments issued prior to the opening of bids which clarify, correct or change the bidding documents or the Contract Documents.

Bid - The offer or proposal of the bidder submitted on the prescribed forms setting forth the prices for the work to be performed.

Bid Forms - Includes the Bid Schedule, Designation of Subcontractors, Bidders Statement of Responsibility, Bidder’s Non-Collusion Affidavit, Bid Security, and all other information requested by the Bid Proposal Documents.

Bidder – Any individual, firm, partnership, corporation, or combination thereof submitting a bid for the work, acting directly or through a duly authorized representative. After the City awards the Contract, the term “Bidder” shall be equivalent to the term “Contractor” for the purpose of identifying the Contractor’s rights and obligations under the Contract Documents.

Bidding Documents - The Notice Inviting Sealed Proposals, Instruction to Bidders, Bid Proposal forms and Bidders Bond.

Bonds - Bid, performance, labor and material, and warranty bonds and other instruments of security.

Change Orders – A written order by the Engineer to the contractor making changes in the plans or specifications which is signed by the Contractor and City authorizing an addition, deletion or revision in the work, with possible adjustment in the contract price or the contract time, issued on or after the effective date of the Agreement. If the change involves items for which there is no contract unit price, the order shall so state and stipulate that the changes shall be performed as extra work or work omitted.

City - The City of San Carlos acting through the City Council or any other board, body, official(s) to which or to whom the power belonging to the City Council has been properly delegated.

9.f
January 26, 2026 Packet Pg. 154
GP-2
City Regulations - All written laws, rules, and policies established by the City, including those set forth in the General Plan, San Carlos Municipal Code, ordinances, resolutions, policies, procedures, and City design documents (including the Standard Specifications, design standards, and relevant Public Facility Master Plans).

Code – The terms Government Code, Labor Code, etc., refer to codes of the State of California.

Contract – See definition for “Agreement”.

Contract Documents - See Agreement, Section 2.1, “List of Contract Documents and Precedence”.

Contract Drawings or Plans - All drawings which may have been prepared by or in behalf of the City, as a basis for proposals, when duly signed and made a part of this contract by incorporation or reference, all drawings submitted in pursuance of the terms of this contract by the successful bidder with his proposal and by the contractor to the City and reviewed by the Engineer; and all drawings submitted by the Engineer to the contractor during the progress of the work as provided for herein.

Contract Price - The total amount of money for which contract is awarded and as amended.

Contract Time - The number of days or the date stated in the contract as the duration for completing work.

Contract Unit Price - The Contractor’s original bid for a single unit of an item of work in the proposal.

Contractor - An individual, partnership, corporation, developer, joint venture, subdivider or other legal entity entering into a contract or agreement with the City to perform the work covered by this contract, and their authorized agents or legal representatives. After the City awards the Contract, the term “Contractor” shall be equivalent to the term “Bidder” for the purpose of identifying the Contractor’s rights and obligations under the Contract Documents.

Day or Days - Unless herein otherwise expressly defined, shall mean a calendar day of twentyfour hours each.

Defective Work - Work that is unsatisfactory, faulty, omitted, incomplete, deficient, or does not conform to the requirements of the Contract Documents, directives of the Engineer, or requirements of any inspection, reference standard, test, or approval specified in the Contract Documents, or has been damaged prior to the Engineer’s recommendation of final acceptance. See General Provisions Section

6.01, “Materials and Workmanship”.

Directive – Any document, signed by the City, with instruction to the Contractor pertaining to the completion of a project objective; including, but not limited to responses to requests for information, clarifications, letters of instruction, the notice of award and the notice to proceed.

Engineer - The Engineer duly and officially appointed by the City to represent the City and to observe the work of construction under this contract, acting personally or through agents or assistants duly authorized by him, such agents or assistants acting within the scope of the particular duties entrusted to them.

Extra Work - Performance or furnishing of work or material found necessary for the proper completion of the improvements, the payment of which is not covered by any item of the bid schedule and for which no means of payment, direct or indirect, has been provided in the contract.

Final Completion - The point at which work has been completed in accordance with the contract documents, plans and specifications to the satisfaction of the Engineer and there are no items of work remaining to be completed. See General Provisions, Section 8.22, “Final Completion”.

9.f
January 26, 2026 Packet Pg. 155
GP-3
Force Account Work – Force account work is a method of compensation utilized to pay for extra work typically needed to overcome unanticipated work, resulting from the project work scope, necessary to complete the project work scope that cannot be well defined prior to the start of extra work. General Provision, Section 5.08 “Change Orders“ establishes the specific methods of compensation for labor, materials and equipment used to perform the force account work.

Greenbook - The Standard Specifications and Plans written and promulgated by Public Works Standards, Inc., entitled “Standard Specifications for Public Works Construction”, and “Standard Plans for Public Works Construction”, current editions.

Hold Harmless - Agreement by one party to bring no claim for negligence, breach of contract, indemnity or otherwise against another party. See Agreement Section 17, “Indemnification”.

Inspector - The engineering or technical inspector(s) duly authorized or appointed by the Engineer or City, limited to the particular duties entrusted to him or them.

Liquidated Damages - The amount of dollars assessed for each and every calendar day required to complete the contract in excess of the contract time. See General Provisions, Section 8.18, “Liquidated Damages”.

Losses - Any and all losses, costs, liabilities, claims, damages, and expenses, including, without limitation, reasonable attorneys’ fees and expenses.

Manual of Uniform Traffic Control Devices (MUTCD) or California Manual of Uniform Traffic Control Devices (CAMUTCD) – The latest edition of the California Manual of Uniform Traffic Control Devices.

Modification – Modifications to the Agreement are executed by change orders, and may only be issued after the effective date of the contract.

Notice - Any notice allowed or required to be given by the City may be given by the Engineer.

Notice of Award – The written notice by the City to the successful Bidder stating that upon completion of required conditions the City will execute the contract.

Notice to Proceed – A written notice by the City to the Contractor authorizing the Contractor to proceed with the work and fixing the date on which the contract time will start.

Plans - The contract plans and/or supplemental drawings approved by the Engineer which show the location, character, dimensions and details of the work.

Project - The total construction of which the work performed under the Contract Documents may be the whole or a part and which may include construction by the City or by separate Contractors.

Proposal - The offer of a bidder when submitted on the proposal form, properly signed and guaranteed.

Reference Specifications - Those standards, rules, method of tests or analysis, codes, and specifications of other agencies, engineering societies, or industrial associations referred to in the Contract Documents. These refer to the current edition or amendments in effect at the time of advertising the project unless specifically referred to by edition, volume or date. Unless otherwise stated in the plans or specifications, the reference specification in effect shall be that edition which was in effect on the date of the Notice Inviting Bids.

Shop Drawings - All drawings, diagrams, illustrations, schedules and other data which are specifically prepared by or for the Contractor to illustrate some portion of the work and all illustrations, brochures, standard schedules, performance charts, instructions, diagrams and other information

9.f
January 26, 2026 Packet Pg. 156
GP-4
prepared by a supplier and submitted by the Contractor to illustrate material or equipment for some portion of the work. See General Provisions, Section 4.19, “Submittals”.

Special Provisions - Any provisions which supplement or modify these standard specifications.

Specifications – The information, directions, provisions and requirements pertaining to the work, and contained herein including Special Provisions, Technical Specification, General Provisions, those administrative subsections of Caltrans’ Standard Specification that are specifically referenced in this Contract and the non-administrative sections (Section 10 through 95) of the Caltrans’ Standard Specification dated 2010.

Standard Plans - The Standard Details of the City of San Carlos, current edition, including the Parks and Streetscape Standard Plans, current edition, identifying construction standards for the various items of work indicated and/or referred to on the plans, specifications or special provisions.

Standard Specifications - The Standard Specifications of the City of San Carlos.

Standard Specifications for Public Works Construction - The Standard Specifications for Public Works Construction, “Greenbook”, current edition.

State - State of California.

State Standard Plans - The Standard Plans of the Department of Transportation of the State of California, (Caltrans’) Standard Plans dated 2010.

State Standard Specifications - The Standard Specifications of the Department of Transportation of the State of California Caltrans’ Standard Specification dated 2010.

Subcontractor - Any individual, firm or corporation having a direct contract with the Contractor or with any other Subcontractor for the performance of a part of the work at the site. Unless otherwise specifically provided, the term Subcontractor includes Subcontractor of any tier, suppliers, manufacturers and distributors. See Section 3.07 of the General Provisions.

Substantial Completion – When the work (or a specified part thereof) has progressed to the point where it is sufficiently complete and in accordance with the Contract Documents. See General Provisions, Section 8.20, “Substantial Completion”.

Superintendent – The executive representative of the contractor responsible for the site supervision of the work at all times during progress, authorized to receive and fulfill instructions from the Engineer and to accept orders for changed and extra work.

Surety - Any individual, firm or corporation, bound with and for the Contractor for the acceptable performance and completion of the work, and the satisfaction of all obligations incurred.

Surveyor - A land surveyor licensed in the State of California.

Unbalanced Bid - See Materially Unbalanced Bid and Mathematically Unbalanced Bid.

Work - The construction and services required by the Contract Documents as amended by contract modifications, whether completed or partially completed, including all labor, materials, equipment, tools, and services provided or to be provided, by the Contractor to fulfill the Contractor’s obligations. The work may constitute the whole or a part of the project Working Day – Any day except Saturday, Sunday, Holidays observed by the City, or days in which the Contractor is entitled to an excusable delay. Holidays observed by the City are: Thanksgiving, day after Thanksgiving, Christmas Day, New Year’s Day, Martin Luther King Jr. Day, President’s Day, Memorial Day, Independence Day, Labor Day, and Veteran’s Day. See General Provisions, Section 8.19, “Delays and Extension of Time”. In addition, at the option of the Engineer, the contractor may be required

9.f
January 26, 2026 Packet Pg. 157
GP-5
to suspend all work and activities during the City’s annual Holiday Closure in late December and early January of each year. No work shall be done during this suspension except such work as is necessary for the proper care and protection of work already performed, or except in case of an emergency, and in any case, only with prior written permission of the Engineer. This suspension of work will be at no cost to the City. Working days will not be assessed during this suspension of work.

9.f
January 26, 2026 Packet Pg. 158
GP-6
SECTION 2 – PROPOSAL REQUIREMENTS AND CONDITIONS

2.01 General - Bidders may obtain complete sets of the Contract Documents, including the proposal forms to be used for bidding, at the location designated in the Notice to Bidders. Bidders shall use complete sets of Contract Documents in the preparation of bids. The City makes copies of the Contract Documents available, on the above terms, for the sole purpose of obtaining Bids for the work and does not confer a license or grant permission for any other use of the Contract Documents.

2.02 Proposal Forms – The portion of the Contract Documents entitled “Bid Proposal” focuses the Bidders attention on the requirements for submitting a proposal, including the Notice to Bidders, and the Bid Proposal Forms.

Bids are required for the entire work described herein and shall be submitted on the blank forms prepared by the City and provided herein. The Bid Proposal submitted to the City shall consist of the completed Bid Schedule, Designation of Subcontractors, Bidders Statement of Responsibility, Bidder’s Non-Collusion Affidavit, Bidder’s Qualifications, Bidders References, Signature of Bidder, Bid Guarantee, and all other information requested by the Bid Proposal documents.

All proposals shall type or print legibly in ink the proposed prices both in writing and in figures and shall be signed, with address included, by the bidder or the bidder's authorized representative.

Corrections must all be individually initialed by the Bidder. Bidder shall not modify or qualify the Bid Forms in any manner.

The Bid Forms shall be signed by a person or persons legally authorized to bind the Bidder to the Contract. The individuals signing each document shall warrant that they are authorized to bind the legal entity of the Bidder. Proposals made by individuals must show the individual's signature and post office address; if made by a firm or partnership and the signature of one or all of the partners must be shown. Proposals submitted by corporations must show the name and post office address of the corporation, the name of the state, under whose laws the corporation is chartered, and the signature and title of the person signing on behalf of the corporation.

2.03 Qualifications of Bidders - Each bidder shall be licensed as specified in the Notice to Bidders and in accordance with the provisions of Chapter 9, Division 3, of the Business and Professions Code, State of California, and shall be skilled and regularly engaged in the general class or type of work called for under this contract.

It is the intention of the City to award a contract only to a bidder who is able to furnish satisfactory evidence that he has the requisite experience and ability and that he has sufficient capital, facilities and plant to enable him to prosecute the work successfully and promptly, and to complete it within the time set forth in the contract.

In determining the degree of responsibility to be credited to a bidder, the City will weigh any evidence indicating the bidder, or personnel guaranteed to be employed in responsible charge of the work, has satisfactorily performed other contracts of like nature and magnitude.

2.04 Rejection of Proposals Containing Alterations, Erasures, or Irregularities - Proposals may be rejected if they show any alterations of form, additions not called for, conditional or alternative bids, incomplete bids, irregularities of any kind, or corrections and erasures without initials by the Bidder.

2.05 Submission of Bids - All Bid Forms, including all documents required to be submitted with the Bid, shall be enclosed in a sealed opaque envelope. The envelope shall be clearly marked on its face with the Bidder’s name and address, and the notation “SEALED BID ENCLOSED, CITY OF SAN CARLOS”, with an identification of the project name and number as identified in the Notice to Bidders. If the Bid is sent by mail, the sealed envelope shall be enclosed in a separate mailing envelope. Oral, telephonic, facsimile, telegraphic, or electronically transmitted Bids are invalid and will not be accepted.

9.f
January 26, 2026 Packet Pg. 159
GP-7
Bids may be mailed or delivered by messenger. It is the Bidder’s responsibility alone to ensure that the Bid is received prior to the bid opening deadline at the place specified in the Notice to Bidders.

Whether or not bids are opened exactly at the time fixed in the public notice inviting bids, any bid received after that time shall be returned unopened.

2.06 Approximate Estimate - The quantities listed in the bid schedule are approximate only, supplied as a general indication of the scope of work and to be used as a basis for comparing bids. The City does not expressly or by implication agree that the actual amount of work will correspond therewith, and reserves the right to increase or decrease the amount of any class or portion of the work, or to delete any portions of the work in their entirety, from the quantities listed on the bid schedule, as may be deemed necessary or advisable by the Engineer.

2.07 Examination of Plans, Specifications and Work Site - Bidder shall examine carefully the plans, specifications, proposal and contract forms, and the physical site of the work contemplated, regardless of if a site walk or pre-bid meeting has been scheduled by the City or not. It will be assumed that the bidder has investigated and is aware of the conditions to be encountered in carrying out the proposed work, and is fully satisfied as to the scope, character, quality, quantity and requirements of the proposed work, and the submission of a bid will be an acknowledgement of that assumption.

The bidder shall receive no additional compensation for obstacles or difficulties due to surface or subsurface conditions actually encountered. Where investigations of surface or subsurface conditions have been made by the City in respect to foundation or other structural design, and that information is shown in the plans, said information is included only for the convenience of bidders. The City assumes no responsibility whatsoever as to the sufficiency or accuracy of borings, or of the log of test borings or other investigations or tests, or of the interpretation thereof; there is no guarantee, warranty or representation, express or implied, that the conditions indicated thereby in fact exist or are representative of those existing throughout the work. Such information shall be used as a basis for bids at the bidder's own and sole risk; making such information available to bidders is not to be construed in any way as a waiver of the other provisions of this paragraph, and bidders must satisfy themselves through their own investigation as to the surface and subsurface conditions to be encountered at the site. By submitting a Proposal, the Bidder has certified that he has examined all items indicated in Section 2.07, "Examination of Plans, Specifications, and Site of the Work."
Each proposal shall be enclosed in a sealed envelope and endorsed as specified in the Notice Invited Sealed Proposals. Bidders are warned the proposals containing irregularities of any kind, including erasures, omissions, conditions, alterations, or additional proposals may be rejected.

2.08 Withdrawals of Proposals - Any proposal may be withdrawn at any time prior to the time fixed in the Notice Inviting Sealed Proposals for the opening of bids, provided that a request in writing, executed by the bidder or his duly authorized representative, for the withdrawal of such bid, is filed with the City. The withdrawal will not prejudice the right of a bidder to file a new proposal.

2.09 Proposal Guarantee - Each proposal shall be accompanied by either a certified check, cashier's check, or bidder's bond of a surety company acceptable to the City in an amount not less than ten percent (10%) of the bid amount, and shall be made payable to the City.

2.10 Disqualification of Bidders - More than one proposal from an individual, firm or partnership, a corporation, or an association under the same or different names will not be considered.

Reasonable grounds for believing that any bidder is interested in more than one proposal for the work will be the cause of the rejection of all proposals in which such bidder is interested. If there is a reason to believe that collusion exists among the bidders, none of the participants in such collusion will be considered. Proposals in which the prices obviously are unbalanced may be rejected.

2.11 Bid Protest Procedures – Any protest of the proposed contract award shall be submitted in writing to the City Clerk no later than 5:00 p.m. on the fifth (5th) business day following the date of the bid opening. If the fifth day falls on a weekend or holiday, the last day of the protest period shall be the first working day following the fifth day.

9.f
January 26, 2026 Packet Pg. 160
GP-8
The protest must include the name, address, and telephone number of the person representing the protesting party. In addition,
(a) The party filing the protest must have submitted a bid for the Project. A Subcontractor of a party filing a bid for the project may not submit a bid protest. (b) The protest must contain a complete statement of the basis for the protest, and refer to the specific portion of the Contract Documents or the specific statute that forms the basis for the protest.
(c) The party filing the protest must concurrently transmit a copy of the protest to the proposed awardee.

Any bidder’s failure to fully comply with these procedures shall constitute a waiver of any right to further pursue a bid protest, including filing of a challenge of the award pursuant to the California Public Contract Code, filing of a claim pursuant to the California Government Code, or filing of any other legal proceedings.

The City shall review all timely protests prior to the award of contract. The City shall not be required to hold an administrative hearing to consider any protests, but may do so at its option. The City Council or the City Manager as designee if the authority to award the contract has already been granted by the City Council, may either reject the protest and award the project to the lowest responsible bidder or accept the protest and award the project to the next lowest responsible bidder. Nothing in this section shall be construed as a waiver of the City Council’s right to reject all bids.

2.12 List of Subcontractors - In accordance with the provisions of Section 4104 of the Public Contract Code, each proposal shall list the name, address and license number of each subcontractor to whom the bidder proposes to sublet portions of the work. A subcontractor is defined as one who contracts with the contractor to furnish materials and labor, or labor only, for performance of work.

Subcontractors shall be listed on the form provided in the Bid Proposal.

2.13 Required Contractor and Subcontractor Registration - In accordance with Labor Code Section 1725.5 and 1771.1, the contractor and all subcontractors shall be registered with the California Department of Industrial Relations (DIR) prior to the bid opening. All 2nd and lower tier subcontractors working on the project shall be registered with the Department of Industrial Relations prior to the work being performed. An inadvertent error in listing a subcontractor who is not registered may not be grounds for considering the bid non-responsive providing that any of the provision in Labor Code Section 1771.1(c) are satisfied.

9.f
January 26, 2026 Packet Pg. 161
GP-9
SECTION 3: REVIEW OF BIDS, CONTRACT AWARD AND EXECUTION

3.01 Public Bid Opening and Initial Review - Bids which have been submitted in accordance with the requirements of the Bidding Documents, and which are received on or before the bid deadline will be opened publicly, and the dollar amounts of each bid shall be read aloud.

The City shall have the right to reject all bids. The City shall have the right to reject any bid not accompanied by the required bid security or any other item required by the Bidding Documents, or a bid which is in any other way incomplete or irregular. The City shall have the right to waive irregularities in a bid, and to award the Contract to the Lowest Responsible Bidder (as determined by the City), only if the irregularities are non-material and inconsequential.

3.02 Determination of Lowest Responsible Bidder - Criteria for determining low bid in all contracts with the City involving an expenditure of $5,000.00 or more shall be determined as the “Lowest Monetary Bidder” on the basis of the Engineer’s approximate estimate of the quantities of work to be done as set forth in the Bid Schedule, in accordance with the calculation criteria set forth on the bid.

After the Lowest Monetary Bidder has been determined, the Engineer shall review that Bidder’s bid in order to determine whether or not that Bidder is the “Lowest Responsible Bidder.” The term Lowest Responsible Bidder shall mean the Lowest Monetary Bidder whose bid is responsive, and who is responsible to perform the work, as required by the Contract Documents.

The term “responsive” is defined by California law, but generally means that the bid has been prepared and submitted in accordance with the Bidding Requirements. The term “responsible” is defined by California law, but generally means that the Bidder is able to demonstrate that it possesses: (1) the capacity to perform the work required by the Contract Documents with respect to financial strength, resources available, and experience; and (2) the integrity and trustworthiness to complete performance of the work in accordance with the Contract Documents.

The City will make its determination of responsibility based upon information submitted by Bidders contained in the Bidders Qualifications and Bidders References included in the Bid Forms and, if necessary, through interviews with previous cities, clients, design professionals, or subcontractors with whom the Bidder has worked. In determining whether or not a Bidder is responsible, the City may consider the following factors in relation to the work to be performed for this Project:
(a) Demonstrated financial strength including, but not limited to, resources available, bonding capacity, and available insurance.
(b) Demonstrated safety record including, but not limited to, Experience Modification Rate. (c) Successful completion of projects of similar scope and size. In reviewing this factor, the City may consider elements including, but not limited to, contract amount of completed projects, experience on public works projects, experience implementing prevailing wage certified payroll requirements, timeliness of performance and, if necessary, evaluation of the Bidder’s work by previous cities, clients, design professionals, or subcontractors. (d) Sufficiency of contract administration and construction management systems including, but not limited to, proposed scheduling tools, proposed subcontract forms, proposed progress payment applications, and proposed certification of payroll documents. (e) History of claims, litigation, termination or disqualification from projects.

If the Engineer finds that the Lowest Monetary Bidder submitted a responsive Bid and that the Bidder is responsible, then that Bidder shall be deemed the apparent “Lowest Responsible Bidder,” and the Engineer shall report the findings to the City Council.

If the Engineer finds that the Lowest Monetary Bidder’s bid is not responsive, or that the Lowest Monetary Bidder is not responsible, then the Engineer may review the responsiveness and responsibility

9.f
January 26, 2026 Packet Pg. 162
GP-10
of the next Lowest Monetary Bidder. If the Engineer finds that the next Lowest Monetary Bidder is responsive and responsible, then that next lowest Bidder shall be deemed the apparent “Lowest Responsible Bidder,” and Engineer shall report its findings as recommendations to the City Council. This process may continue until the Engineer finds the Lowest Monetary Bidder which is also responsive and responsible.

In the event that one or more Low Monetary Bidders are found by the Engineer to be nonresponsive or non-responsible, those Bidders will be given notice and a reasonable opportunity to present additional relevant evidence to the Engineer for consideration, within five (5) working days after the Bidder receives the notice.

All findings by the Engineer shall be reported as recommendations to the City Council. The City Council reserves the right to reject any or all Bids, and to waive any irregularity. No Bid shall be binding upon the City until after the Agreement is signed by both the Contractor and the City. If the City Council determines that it is in the City’s best interest to award the Agreement, a Notice of Award shall be sent to the Lowest Responsible Bidder as determined by the City Council. The City Council’s decision shall be final.

The City may investigate the responsibility and qualifications of all Bidders to whom the award is contemplated for a period not to exceed ninety (90) calendar days after the Bid opening, during which time no bid shall be withdrawn by the Bidders. The ninety (90) day review period may be extended upon the written request by the Engineer and written approval by the affected Bidder.

3.03 Notice of Award – Should the City decide to proceed with the award of contract the City shall issue a Notice of Award to the lowest responsible bidder.

3.04 Contract Execution - Within fifteen (15) calendar days after receipt of the Notice of Award, the bidder shall submit to the City two (2) originals of the signed agreement, the required contract bonds and certificates of insurance. If the bidder fails or refuses to enter into a contract to do the work, then the proposal guarantee accompanying the bid shall be forfeited to the City. After the Bidder has properly submitted these documents, the City will execute the Agreement and issue a Notice to Proceed.

3.05 Status of Contractor - The right of general supervision by the City shall not make the contractor an agent of the City, and the liability of the contractor for all damages to persons or to public or private property arising from the contractor's execution of the work shall not be lessened because of such general supervision.

3.06 Assignment - No agreement or portion thereof maybe assigned without consent of the Council, except that the Contractor may assign money due which will accrue to him under the Agreement.

If given written notice, such assignment will be recognized by the City to the extent permitted by law, but any assignment of money shall be subject to all proper setoffs and withholdings in favor of the City and to all deductions provided for in the Agreement. All money withheld, whether assigned or not, shall be subject to being used by the City for completion of the work, should the Contractor be in default.

Any attempt to assign or delegate the Agreement without the written consent of the City shall be void and of no force and effect. Consent by the City to one assignment shall not be deemed to be consent to any subsequent assignment.

3.07 Recognition of Subcontractors - No subcontractors will be recognized as such, and all persons engaged in the work of construction will be considered as employees of the contractor and their work shall be subject to the provisions of the contract, including specifically these general stipulations, the specifications and the contract drawings.

3.08 Return of Bid Security - Within ten (10) working days after the execution of the Agreement, the City will return the proposal guarantees accompanying the proposals that are not to be considered in making the award. All other proposal guarantees will be held until the Agreement has been fully executed, after which, they will be returned to the respective bidders whose proposals they accompanied.

9.f
January 26, 2026 Packet Pg. 163
GP-11

3.09 Forfeiture of Proposal Guarantee - If Bidder does not properly execute the contract and submit the acceptable bonds, insurance and certifications within the specified time; this shall be just cause for the annulment of the award and the forfeiture of the proposal guarantee to the City. The City may then award the contract to next Lowest Responsible Bidder. The forfeited proposal guarantee may be utilized by the City in accordance with Public Contract Code, Sections 20170 through 20174.

3.10 Contract Bonds - Before execution of the contract by the City, the Contractor shall file with the City surety bonds satisfactory to the City in the amounts, and for the purposes, noted below.

Said bond shall be on the form furnished by the City herein. (a) Performance Bond - The contractor shall furnish and bear the cost of a bond of a surety company acceptable to the City, which bond is conditioned upon the faithful performance of all covenants and stipulations under this contract within the time prescribed, in a manner satisfactory to the City, and that all materials and workmanship will be free from original or developed defects. The amount of the bond shall be one hundred percent (100%) of the total contract price; as such sum is set forth in the agreement.

Said bond shall be on the form furnished by the City herein.

As a condition precedent to satisfactory completion of this contract, an amount equal to ten percent (10%) of the estimated contract cost shall hold good for the period specified in said bond after completion and acceptance of the work by the City. (b) Labor and Material Bond – The contractor shall furnish and bear the cost of a bond of a surety company acceptable to the City in the sum not less than one hundred percent (100%) of the total contract price, as such sum is set forth in the agreement, for the payment in full of all persons, companies, or corporations who perform labor upon or furnish materials to be used in the work under this contract, in accordance with the provisions of Section 4200 to 4208, inclusive (Chapter 3, Division 5), of the Government Code of the State of California, and any acts amendatory thereof. The bond shall be maintained by the Contractor in full force and effect until the work is accepted by the City and until all claims for materials and labor are paid.

Said bond shall be on the form furnished by the City herein. (c) Warranty Bond - The Contractor shall furnish a warranty bond in the amount of ten percent (10%) of the final contract price (total cost including change orders) to guarantee his work for two (2) years after acceptance of the work by the City Council.

Bonds shall be duly executed by a responsible corporate Surety, licensed and authorized to issue such bonds in the State of California and secured through an authorized agent with an office in California. Each bond shall be signed by both the Contractor and Surety and the signature of the authorized agent of the Surety shall be notarized.

The Contractor shall pay all bond premiums, costs and incidentals. Should any bond become insufficient due to an increase in the contract amount, the Contractor shall obtain supplemental bonding within ten (10) days.

Should any Surety at any time be unsatisfactory to the City, notice will be given the Contractor to that effect. No further payments shall be deemed due or will be made under the Agreement until a new Surety shall qualify and be accepted by the City.

Changes in the work, or extensions of time, made pursuant to the Agreement, shall in no way release the Contractor or Surety from their obligations. The requirement for notifying the Surety of such changes or extensions shall be waived by the Surety.

9.f
January 26, 2026 Packet Pg. 164
GP-12

3.11 Notification of Surety Companies - The surety companies shall familiarize themselves with all conditions and provisions of this contract and they waive the right of special notification of any change or modification of this contract or of extension of time, or of decreased or increased work, or of the cancellation of the contract, or of any other act(s) by the City or City's authorized agents, under the terms of this contract, and failure to so notify the aforesaid surety companies of changes shall in no wise relieve the surety companies of their obligation under this contract.

3.12 Power of Attorney - Attorneys-in-fact who sign bid bonds or contract bonds must file a certified and effectively dated copy of their Power of Attorney with each bond.

3.13 Insurance Requirements - Contractor shall provide at his own cost and expense from contract award date to acceptance of the work covered by the contract:
(a) Workmen's Compensation and Employer's Liability Insurance of not less than the amount shown in the Special Provisions for all of his employees to be engaged in the work under this contract. Should any such work be sublet, the contractor shall require each of his subcontractors at any tier similarly to provide Workmen's Compensation and Employer's Liability Insurance, all in strict compliance with Federal and State laws. (b) Personal Injury, Bodily Injury and Property Damage Liability Insurance (including automobiles, products and/or completed operations coverage) and Aircraft and Watercraft Bodily Injury Liability and Property Damage Liability Insurance if contractor uses owned or non-owned water aircraft in his operation, with Personal Injury and Bodily Injury (including death resulting therefrom) of not less than a combined Personal Injury and Property Damage Liability limit of not less than the amount shown in the Special Provisions. Should any work covered by the contract be sublet contractor shall require each of his subcontractors of any tier similarly to provide the aforesaid coverages. (c) All Risk (excluding Earthquake and Flood) Builder's Risk Insurance in an amount not less than the value of any work under this contract, except for buried pipelines and appurtenances which need not be included in the insurance value. Under the policies of insurance described above, each policy shall contain the provision for thirty (30) days written notice submitted by registered mail from the insurance carrier(s) to the City prior to cancellation or reduction in coverage.

3.14 Special Requirements - Under the policy of insurance described in Section 13.13-b, the policy shall contain the following provisions:
(a) The City and the City's officers, representatives, agents and employees shall be named as additional insureds.
(b) Endorsement providing that such insurance is primary insurance and no insurance of the additional insureds shall be called on to contribute to a loss. (c) Endorsement providing that such insurance shall not contain any exclusion regarding loss or damage to property caused by explosion or resulting from collapse of buildings or structures or damage to property underground, commonly referred to as "XCU" hazards. (d) Standard cross-liability clause covering personal injury, bodily injury (including death resulting therefrom), and property damage.

9.f
January 26, 2026 Packet Pg. 165
GP-13

3.15 Builders Risk Insurance - Under the policy of insurance, the policy shall contain the following provisions:
(a) The City shall be included as insured.
(b).. Losses shall be payable to the contractor and City as their interest may appear. (c).. Deductible amounts of all losses covered by insurance shall be borne by the contractor.

3.16 Certificates - Prior to beginning work, contractor shall furnish certificates satisfactory to the City as to contents and carriers of such insurance.

3.17 Legal Address of Contractor - Contractor's address as shown in the proposal, as well as such office or headquarters the contractor establishes at the site of work, hereby are designated as addresses to which drawings, samples, notices, letters, articles, or other communications to the contractor may be mailed or delivered. The delivery at either of these places of any item or communication from the City or agents thereof to the contractor shall be deemed sufficient service of such delivery. Contractor's address as shown in the proposal may be changed at any time by notice in writing from the contractor to the City. Nothing herein contained shall be deemed to preclude or render inoperative the service of any drawing, sample, notice, letter, or other article of communication to or upon the contractor personally.

3.18 Office of Contractor at Site - During the performance of the contract, Contractor shall maintain a suitable office at the site of work which shall be the headquarters of a representative authorized to receive drawings, instructions or other communications or articles from the City or City's agents; any such thing given to said representative or delivered at the contractor's office at the site of work in his absence shall be deemed to have been given to the contractor. Contractor shall maintain a complete set of plans and specifications at the site office whenever work is in progress.

9.f
January 26, 2026 Packet Pg. 166
GP-14
SECTION 4 - SCOPE AND CONTROL OF WORK

4.01 Work to be Done – The work to be done consists of furnishing all labor, materials, tools, equipment and services necessary to complete the project, as further described in the Notice to Bidders of these Specifications, and as necessary to leave the site in a neat and finished condition with all equipment properly installed and working to the satisfaction of the Engineer.

While the City has endeavored to accurately represent in the plans and specifications the physical conditions which may affect the cost of the proposed work, the City does not warrant the completeness or accuracy of such information. It is the Contractor’s responsibility to ascertain the existence of any such conditions affecting the cost of the work, which would have been disclosed by reasonable examination of the site.

Conclusions pertaining to any test, investigation, statement or estimate of fact incorporated in the plans and specifications shall be considered by the Contractor to be a recommendation only. The Contractor may request equal access to the underlying or background information to arrive at his own opinion thereon, including his determination of how reliable might be any conclusion appearing in (or inferred from) the information. The Contractor may not rely upon “record drawings” or similar final or accepted drawings or maps constructed on public or private property. Such information may be used for reference only. Actual locations and depths shall be determined by field investigations by the Contractor.

No oral or telephonic agreement or conversation with any officer, agent, or employee of the City or the Engineer, either before or after execution of the contract, shall affect or modify any of the terms or obligations contained in any of the contract documents.

4.02 Plans and Specifications - It is the intent of the Plans and Specifications to describe a functionally complete project (or part thereof) to be constructed in accordance with the Contract Documents. For convenience, the Specifications are arranged in several sections, but such separation shall not be considered as the limits of the work required by any separate trade. The terms and conditions of such limitations are wholly between the Contractor and his subcontractors. In general, the Special Provisions, General Provisions, and other sections of the specifications indicate the responsibilities of the Contractor and the quality of material and methods of workmanship. The plans indicate dimensions, quantities, positions, and various other details of construction.

Any work, materials or equipment that may be reasonably inferred from the Contract Documents as being required to produce the intended result shall be supplied whether or not specifically called for.

When words, which have a well-known technical or trade meaning, are used to describe the work, materials or equipment, such words shall be interpreted in accordance with that meaning. See General Provisions, Section 6.03, “Trade Names or Equals”.

Subheadings and titles printed on the drawings in these General Provisions, in the specifications, and elsewhere in the contract documents, are inserted for the convenience of reference only, and shall not be taken or considered as having any bearing on the interpretation thereof.

4.03 References to Standards and Codes - Reference to standard specifications, manuals or codes of any technical society, organization or association, or to the Laws or Regulations of any governmental authority, whether such reference be specific or by implication, shall mean the latest standard specification, manual, code or Laws or Regulations in effect at the time of the opening of bids (or, on the Effective Date of the Agreement if there were no bids), except as may be otherwise specifically stated. However, no provisions of any referenced standard specifications, manual or code (whether or not specifically incorporated by reference in the Contract Documents) shall be effective to change the duties and responsibilities of City, Contractor or Engineer, or any of their consultants, agents or employees, from those set forth in the Contract Documents, nor shall it be effective to assign to the Engineer, or any of the Engineer’s Consultants, agents or employees, any duty or authority to supervise or direct the furnishing or performance of the work or any duty or authority to undertake responsibility for the Contractor.

9.f
January 26, 2026 Packet Pg. 167
GP-15

4.04 Authority of the Engineer – The City has the final authority in all matters affecting the work. Within the scope of the Agreement, the Engineer has the authority to enforce compliance with the Plans and Specifications and the Contractor shall promptly comply with instructions from the Engineer.

The decision of the Engineer is final and binding on all questions relating to: quantities; acceptability of materials furnished and work performed; equipment; work execution, rate of progress or sequence of work; and interpretation of the Plans, Specifications, or other drawings. This shall be precedent to any payment under the Agreement, unless otherwise ordered by the City.

4.05 Contract Documents and Precedence - The Contract Documents consist of the documents listed below, in order of precedence. If there is a conflict between component parts of the Contract Documents, the document highest in precedence controls. (a) Change Orders.
(b) Project Directives.
(c) Permits issued by other agencies.
(d) Permits issued by the City.
(e) Agreement and required agreement forms – Bid Bond, Faithful Performance and Labor and Materials Bonds, Warranty Bond, Insurance Endorsements, Worker’s Compensation Certification.
(f) Project Specifications, in the following order - Addenda, Bid Proposal including all Bid Proposal Forms, Notice Inviting Sealed Proposals, Special Provisions, Technical Provisions, Exhibits to the Proposal, and General Provisions. (g) Project Plans and Drawings.
(h) City Standard Specifications.
(i) City Standard Plans.
(j) Reference Specifications, in the following order – State of California Department of Transportation (Caltrans) State Standard Specifications (current edition), Standard Specifications for Public Works Construction “Greenbook”. (k) Reference Plans, in the following order – State of California Department of Transportation (Caltrans) State Standard Plans (2010 edition), Standard Plans for Public Works Construction (2010 edition).

All of the individual components of the Contract Documents are intended to be complementary and what is required by one shall be binding as if required by all. Interpretation of a disputed meaning or intent of the plans and specifications shall be made initially by the Engineer in accordance with the application of the order of precedence. Any final decision required regarding precedence and the clarification of discrepancies in the Contract Documents shall be made by the Engineer.

4.06 Interpretation of Specifications and Drawings - The specifications and the contract drawings are intended to be explanatory of each other. Any work indicated in the contract drawings and not in the specifications, or vice versa, is to be executed as if indicated in both. Should it appear that the work to be done, or any of the matters relative thereto are not sufficiently detailed or explained in these contract documents, including the contract drawings, the contractor shall apply in writing to the Engineer for such further explanations as may be necessary and shall conform thereto as part of this contract so far as may be consist with the terms of the contract. Should any doubt or question arise respecting the true meaning of the specification, the Engineer shall make the final decision.

4.07 Figured Dimensions - Figured dimensions on the contract drawings shall in all cases be given precedence over scaled dimensions. If figured dimensions do not correspond to scaled dimensions, contractor shall request Engineer to verify the accuracy of the figured dimensions. It shall be the responsibility of the contractor to ascertain the correct scale of all contract drawings in his possession, including those which may have been reduced for reproduction.

9.f
January 26, 2026 Packet Pg. 168
GP-16

4.08 Errors or Discrepancies - If the contractor, in the course of the work, discovers any discrepancies between the drawings and the conditions of the ground, or any errors or omissions in the drawings or in the layout given by stakes, points or instructions, it shall be his duty to inform the Engineer immediately in writing, and the Engineer shall promptly verify the same. Any work done after such discovery, until authorized, will be done at the contractor’s risk.

4.09 Drawings to be Furnished by Contractor - As soon as practical after the execution of this contract, the contractor shall supply drawings of devices to be furnished hereunder as are called for herein or as are required by the Engineer to make clear the details of construction and to demonstrate fully that all materials and equipment comply with the intent and provisions of this contract. Unless otherwise herein specified, such drawings shall be submitted to the Engineer for his review. Should the Engineer take exception with any drawings furnished by the contractor, the contractor shall make the revisions required, and resubmit them to the Engineer for review. After a satisfactory review by the Engineer, these drawings shall become a part of this contract and the work shall be done in conformity therewith. No such work shall be begun or devices purchased until the review of the drawings detailing such items have been completed. The review of the drawings shall not relieve the contractor of responsibility, or waive or modify any of the provisions or requirements of this contract.

The Engineer's review of drawings submitted by the contractor will be for, and will cover, only generally conformity to the plans and specifications and will not constitute a blanket approval of all dimensions, quantities and details of the material or equipment shown by (nor shall review relieve the contractor of his responsibility for errors contained in) such drawings.

All shop drawings submitted by the various subcontractors which require review of the City's representative shall first be sent to the contractor who shall keep a record of the drawing numbers and the date of their receipt by him. Contractor shall submit the drawings to City's representative for review in time to prevent delays in delivery of materials.

Contractor shall thoroughly check all such shop drawings for measurements, size of member, materials and details to make sure they conform to the intent of the plans and specifications. Drawings found to be inaccurate or otherwise in error shall be returned by the contractor to the subcontractor for correction before they are submitted by the contractor to the City's representative for review.

4.10 Additional Drawings by City - Contract drawings are intended to be comprehensive and to indicate in detail the scope of the work. However, the Engineer may furnish the contractor additional drawings during the progress of the work in order to clarify and define in greater detail the intent of the contract drawings or specifications. Contractor may request such detailed drawings by submitting his request in writing to the Engineer at least two (2) weeks in advance of the time they are required.

4.11 Lines and Grades - All work under this contract shall be constructed to the lines, grades and elevations shown on the contract drawings. Contractor shall establish the lines, grades and elevations unless it is otherwise specified in the Special Provisions.

4.12 Record Documents – The Contractor shall keep at the worksite a record copy of all Drawings, Specifications, Addenda, Written Amendments, Change Orders, Work Directives, Field Orders and written interpretations and clarifications. These record documents together with all approved submittals, samples and shop drawings will be available to the Engineer as a reference at all times. Upon completion of the work, these record documents will be delivered to Engineer.

4.13 Record Drawings –The Contractor shall prepare and update a master “as-built” set of red ink-lined plans, to be reviewed and approved by the Engineer at the end of every month. Drawings shall contain information showing where actual installation differs from that shown on the original drawings, where underground or concealed features are found noting alignment (to 0.25’) and elevation (to 0.1’ ), field changes or deletions of work, and any additional work by change order. Upon the project’s completion, and prior to the project’s acceptance, the Contractor shall submit to the City the completed as-built record Drawings on one (1) set of full size prints prepared on 22" x 34" paper.

Record Drawings are full size drawings (Plans) which marked up during construction to delineate

9.f
January 26, 2026 Packet Pg. 169
GP-17
the actual in-place constructed conditions. Record Drawings shall be provided by the Contractor for this Project. Requirements for Record Drawings as specified elsewhere shall supplement the requirements specified herein.

4.14 Reuse of Documents - Neither the Contractor nor any Subcontractor or supplier or other person or organization performing or furnishing any of the work under a direct or indirect agreement with the City shall have any title or rights to any of the Drawings, Specifications or other documents (or copies thereof) which bear the seal of the design engineer. Such documents shall not be reused on extensions of the project or for any other project without written consent of the City and the design engineer.

4.15 Subsurface Data – If completed, all soil and soil test data, water table elevations, and soil analyses included or referred to in the Contract Documents apply only at the location of the test holes and to the depths indicated. If completed, soil test reports for test holes which have been drilled are available for inspection at the office of the Engineer. Any additional subsurface exploration shall be done by Bidders or the Contractor at their own expense.

The elevation of the water table indicated by soil test reports is that which existed on the date the test hole was drilled. It is the Contractor’s responsibility to determine and allow for the possibility of differing ground water elevations on the date of the project’s construction. A difference in elevation between ground water shown in soil boring logs and ground water actually encountered during construction will not be considered as a basis for extra work.

4.16 Right-of-Way – Acquisition of right-of-way or permanent easements necessary for the improvements as shown on the plans will be provided by the City. Unless otherwise provided, the Contractor shall make his own arrangements, pay for, and assume all responsibility for acquiring, using, and disposing of additional work areas, easements, and temporary facilities required. Contractor shall identify and hold the City harmless from all claims for damages resulting from such actions.

4.17 Removal of Defective and Unauthorized Work - Should the Contractor deliberately proceed with any portion or phase of construction which is obviously incorrectly indicated in the contract plans or documents, he shall be responsible for any corrective measures required to make adequate repairs or adjustment. This shall include any work done beyond the lines and grades shown on the plans or established by the Engineer, or any extra work done without written authority.

All work that has been rejected shall be remedied or removed and replaced by the Contractor in an acceptable manner and no compensation will be allowed for such removal or replacement. If the Contractor fails to remedy rejected work within ten (10) working days after written demand, the City may, without prejudice to other remedies, sell such materials at auction or at private sale, or otherwise dispose of such material. The Contractor shall be entitled to the proceeds of such sale, if any, in excess of the costs and damages for which the Contractor is liable to the City, including reasonable attorneys’ fees and expenses and compensation for the City’s services and expenses.

4.18 Acceptance of Defective Work - The City shall have the option, at its sole discretion and by written notice to the Contractor, to accept defective work instead of requiring its removal or correction, in which case the contract sum shall be reduced by an amount equal to the difference between the value to the City such work would have were it complete, correct, and in conformity with the Contract Documents and the value to the City of such defective work. Such option shall be exercised solely by written notice to the Contractor and shall not be implied from any act or omission by the City or the Engineer. If the remaining payments and retention are insufficient to cover the amount of the reduction of the contract sum, the Contractor shall promptly pay to the City the amount of any such deficiency.

4.19 Submittals - Within ten (10) working days following the Notice to Proceed, the Contractor shall provide a detailed list for review and approval of all individual submittals required to be submitted under the contract. The list shall reference the specification section and paragraph that requires the submittal along with the date the Contractor plans to transmit the submittal to the City for review.

Unless otherwise requested by the Engineer, submittals shall be provided electronically in .pdf format at least twenty-eight (28) calendar days prior to the approval being necessary for the work.

9.f
January 26, 2026 Packet Pg. 170
GP-18
Submittals shall be transmitted with a Submittal Cover Letter form as approved by the Engineer. Large submittals consisting of reports, oversized or colored pages, full sized shop drawings, manuals contained in binders, or submittals in other forms not easily reproduced shall be provided in hard copy format with six (6) copies.

For items requiring shop drawings, no materials shall be furnished, and no work shall be performed, until the drawings have been favorably reviewed. Shop drawings shall be of a size and scale to clearly show all necessary details.

After review by the City of each of the Contractor's submittals, the material will be returned to the Contractor marked with actions defined as follows:
(a) NO EXCEPTIONS TAKEN - Accepted subject to its compatibility with future submissions and additional partial submissions for portions of the work not covered in this submission.

Does not constitute acceptance of deletion of specified or required items not shown in a partial submission.
(b) MAKE CORRECTIONS NOTED - The same as item (a), except that minor corrections as noted by the City shall be made by the Contractor. No resubmission is required. (c) REVISE AND RESUBMIT - Rejected because of major inconsistencies or errors which shall be resolved or corrected by the Contractor prior to subsequent review by the City. (d) REJECTED - Submitted material does not conform to plans and Specifications in major respects. This material is not expected to be resubmitted. (e) SUBMIT SPECIFIED ITEM - Submittals not reviewed by the City but received for record purposes.

Favorable review of the shop drawings by the Engineer is interpreted to mean that there is substantial and acceptable conformance with the contract plans, but details of design may not necessarily be checked for adequacy or accuracy. Such acceptance shall not relieve the Contractor from the responsibility for errors or omissions in the shop drawings or from deviations from the contract documents unless such errors, omissions, or deviations were specifically called to the attention of the Engineer in writing. The Contractor shall be responsible for the correctness of the shop drawings, for shop fits and field corrections, and for the results obtained by the use of such plans.

4.20 Substitutions – Proposed requests by the Contractor for changes in products, materials, equipment, and methods of construction required under the Contract Documents after the award of contract are considered "requests for substitutions.” For proposed “or equal” substitutions, attention is directed to General Provision Section 6.03, “Trade Names or Equals.” Each request for substitution shall be prepared and presented to the City in accordance with the procedures for submittals, except that the following additional information shall be provided. (a) An explanation of the advantages to the City for accepting the substitution. (b) A comparison of significant qualities of the proposed substitution with those specified. (c) A list of changes or modifications needed to other parts of the work and to construction performed by the City and separate Contractors, that will be necessary to accommodate the proposed substitution.
(d) A statement indicating the substitution's effect on the Construction Schedule compared to the Baseline Construction Schedule without acceptance of the substitution. Indicate the effect of the proposed substitution on overall contract time. (e) Cost information, including a proposal of the net change, if any, in the Contract Sum. (f) Certification that the substitution is equal to or better in every respect to that required by Contract Documents, and that it will perform adequately in application indicated. Include Contractor's waiver of rights to additional payment or time extensions, that may be necessary because of the substitution's failure to perform adequately.

9.f
January 26, 2026 Packet Pg. 171
GP-19
No extension of time will be allowed through failure of the Contractor to either transmit requests for substitution sufficiently in advance of the work, or on account of processing time outside the time limits noted.

4.21 Construction Staking Lines and Grades - Unless otherwise stated in the Special Provisions, the Contractor shall provide, preserve, and replace if necessary, all of the necessary construction stakes required for the construction of the project. Grades for underground conduits will be set on the ground surface and shall then be transferred to the bottom of the trench by the Contractor.

Stakes or marks will be set by a California Licensed Surveyor or a California Registered Civil Engineer to establish the lines and grades required for the completion of the work as specified in the Contract Documents. It shall be the Contractor's responsibility to notify the Engineer of any discrepancies found between field grades and notes shown within the Contract Documents.

Contractor shall furnish horizontal control and cut sheets to the Engineer immediately upon the setting of construction or boundary markers. Upon completion, all work shall conform to the lines, elevations, and grades shown on the plans.

4.22 Inspection of the Work - All work is subject to inspection and approval of the Engineer.

Unless otherwise stated in the specifications, the City shall perform all required inspections. The Contractor shall notify the Engineer before noon of the working day before inspection is required. Unless otherwise authorized, work shall be done only in the presence of the Engineer. Any work done without proper inspection will be subject to rejection. The Engineer shall at all times have access to the work during its construction at shops and yards as well as the project site. The Contractor shall provide every reasonable facility for ascertaining that the materials and workmanship are in accordance with the Contract Documents. Inspection of the work shall not relieve the Contractor of the obligation to fulfill all conditions of the contract.

If a portion of the work is covered contrary to the Engineer’s request or direction, or contrary to the requirements of the Contract Documents, it must, if required in writing by the Engineer, be uncovered for the Engineer’s observation and be replaced at Contractor’s expense without adjustment of the contract time or the contract sum.

If a portion of the work has been covered, which is not required by the Contract Documents to be observed or inspected prior to it’s being covered and which the Engineer has not specifically requested to observe prior to it’s being covered, the Engineer may request to see such work and it shall be uncovered and replaced by Contractor. If such work is in accordance with the Contract Documents, the costs of uncovering and replacing the work shall be added to the contract sum by change order; and if the uncovering and replacing of the work extends the contract time, an appropriate adjustment of the contract time shall be made by change order. If such work is not in accordance with the Contract Documents, the Contractor shall pay such costs and shall not be entitled to an adjustment of the contract time or the contract sum.

Regular working hours for City Construction Inspectors are between 7:30 a.m. and 4:00 p.m., Monday through Friday, excluding City holidays. If the Contractor works outside these times, the Contractor may be charged for additional inspection. Inspection by the Engineer or by a City inspector, or any order measurement, approved modifications, certificate or payment of money, or acceptance of any part of whole of the work, or any extension of time, or any possession by the City or its agents, shall not operate as a waiver for any provision of this contract or of any power reserved therein to the City, or any right to damage thereunder; no breach of this contract shall be held to a waiver of any or subsequent breach. All remedies shall be taken and construed as cumulative.

4.23 Testing - Unless otherwise stated in the Contract Documents, all required testing will either be performed directly by an independent laboratory coordinated and paid for by the Contractor. The Contractor shall submit the resulting certified test results and Certificates of Compliance for all materials requiring such as specified in the Technical Provision. Contractor shall cooperate with the City in coordinating the necessary testing. The coordination of testing, including the number and location of tests,

9.f
January 26, 2026 Packet Pg. 172
GP-20
shall be under the direction of the Engineer. All compaction test sites deeper than five (5’) feet below grade shall be properly shored by the Contractor to protect testing personnel.

The cost for performing re-tests due to failures, or additional call-outs if work is not ready to test, will be charged to the Contractor. The City shall require retesting until all required tests are successfully passed.

9.f
January 26, 2026 Packet Pg. 173
GP-21
SECTION 5 – CHANGES IN WORK

5.01 Limited City Authority to Approve Change Orders - The Contractor recognizes that the City is a public agency and that it can only act through its duly authorized agents. In this regard, the Contractor agrees that only written change orders, executed by the governing body of the City, shall be valid. The Engineer shall have no authority to issue a change order unless so specifically authorized, and no person shall have authority to issue any oral change order.

5.02 Contractor Liability for Unapproved Change Orders - Unless a valid change order is issued, all changes in the work performed by the Contractor shall be at the Contractor’s own risk, and shall not be entitled to any additional compensation. Furthermore, the Contractor may be required to make the work conform to the plans and specifications. No act or series of acts by the City during the course of the contract shall be deemed to constitute a waiver of the City’s right to rely upon the provisions of this Section 5, “Changes in Work”.

5.03 Non-Material Change Requests by the Contractor - Changes in the plans and specifications requested in writing by the Contractor, which do not materially affect the work and which are not detrimental to the work or to the interests of the City, may be granted to facilitate the work, when approved in writing by the Engineer. If such changes are granted, they shall be made at a reduction in cost or at no additional cost to the City. Nothing herein shall be construed as granting a right to the Contractor to demand acceptance of such changes or to increase the contract sum or contract time as a result of the proposed change.

5.04 Effect of Extension of Time - The granting of any extension of time due to delays which, in the judgment of the City, are unavoidable delays shall in no way operate as a waiver on the part of the City of his rights under this contract.

5.05 Letters of Instruction - The Engineer may issue letters of instruction in the form of Field Orders, Clarifications, responses to Requests for Information, or any other document which makes interpretations or clarifications to the Contract Documents that do not modify the scope of work or involve an adjustment in the contract sum or contract time. Letters of Instruction shall be binding upon the Contractor, and the Contractor shall promptly carry out the requirements of such Letters of Instruction.

5.06 Requests for Information, Inconsistencies and Changed Conditions - Before undertaking each part of the work, the Contractor shall carefully study all pertinent figures shown in the Contract Documents and verify that all applicable field measurements are free of conflicts, errors, discrepancies, inconsistencies and omissions. If such conditions are discovered, the Contractor shall notify the Engineer by writing a Request for Information, and await direction from the Engineer before proceeding.

If the Contractor encounters a changed condition, as defined by one or more of the conditions below, the Contractor shall notify the Engineer by writing a Request for Information before disturbing the condition further.

(a) Material differing from that represented in the Contract which the Contractor believes may be hazardous waste, as defined by Health and Safety Code, Section 25117 that is required to be removed to a Class I, Class II, or Class III disposal site in accordance with provision of existing law; and
(b) Subsurface or latent physical conditions at the site differing materially from those represented in the Contract Documents; and
(c) Unknown physical conditions at the site of any unusual nature, which differ materially from those ordinarily encountered and generally recognized as inherent in the work and of the character provided for in the Contract Documents.

No extension of Contract time shall be made by the City due to the Contractor’s failure to provide a timely written notice of any inconsistency or changed condition requiring direction. The Engineer will

9.f
January 26, 2026 Packet Pg. 174
GP-22
respond to the Contractor’s Request for Information within three working days, providing an interpretation, clarification or change order for an appropriate adjustment in contract time and cost pursuant to General Provisions, Section 5.07, and “Change Orders”. Contractor shall wait for the Engineer’s written response to a Request for Information before proceeding with any work.

The Contractor shall not be liable to the City for failure to report any conflict, error, or discrepancy in the Contract Documents, unless the Contractor had actual knowledge or could foresee such conditions as may be discovered by a reasonable examination of the work site or materials. If the Contractor performs any construction activity in which he knows or should know involves an error, inconsistency, ambiguity, or omission referred to in this Section, without notifying and obtaining the written consent of the Engineer, Contractor shall be responsible for the resultant costs, including, without limitation, the costs of correcting defective work. However, in an emergency affecting the safety of persons or property, the Contractor shall take all reasonably necessary precautions to prevent or minimize damage, injury, or loss.

5.07 Extra and Omitted Work - Whenever corrections, alterations or modifications of the work under this contract are ordered and approved by the Engineer and increase the amount of work to be done, such added work shall be known as Extra Work. When such corrections, alterations or modifications decrease the amount of work to be done, such deleted work shall be known as Omitted Work. The General and Special Provisions shall apply with equal force to all extra and omitted work.

When the Contractor considers that any changes ordered involve extra or omitted work, he shall immediately notify the Engineer in writing and subsequently keep him informed as to when and where the alleged extra work is to be performed.

When extra work reports are agreed upon and signed by both parties, they shall become the basis of payment. When extra work is still under negotiation or has not been agreed upon, the Contractor shall keep daily detailed and accurate records itemizing each element of cost and shall provide certified payroll, invoices, and other substantiating records and documentation with records and/or claims for compensation to be provided no later than 30 days following the time in which the work claiming to be extra was performed.

Unless notification of extra work is documented, and unless a complete statement of materials used and expenses incurred is furnished by the Contractor, the Contractor shall not be entitled to payment of such alleged extra work, and any future claims for compensation will be invalid.

Payment for extra work shall be in accordance with General Provisions, Section 5.08 - “Change Orders”. Omitted work shall not constitute a claim for damages on account of anticipated profits on the work that may be omitted.

5.08 Change Orders – At any time during the progress of the work, and without in any way rendering void the Agreement, the City may order alterations, additions or deductions from the work by change order, without notice to sureties. When so ordered in writing, the Contractor shall proceed with work as directed by the change order.

The change order shall describe the change in the work, the adjustment of the contract sum (if any), and the adjustment of the contract time (if any). The Contractor shall not be entitled to any extension of time for the completion of the work by virtue of any change order unless the change order specifically provides for this. If, after receiving a change order, the Contractor feels that he is entitled to an extension of time, he may, within five (5) working days file a written claim to that effect for consideration by the Engineer.

The process of submitting a proposed change, a cost proposal, or negotiating an agreed upon change order, or any failure to reach an agreement as to an adjustment in the contract sum or the contract time, shall not relieve the Contractor of his obligation to perform in accordance with the Contract Documents.

9.f
January 26, 2026 Packet Pg. 175
GP-23
A change order may be in the form of a City directed change order or an agreed upon change order. Upon the receipt of either form of change order, the Contractor shall proceed promptly and diligently with the extra work.
(a) City Directed Change Orders - A City directed change order may be issued by the City without the Contractor’s signature where the City determines that it is in the City’s best interest to proceed with the work, and the change does not materially alter the character of the work. The Contractor shall be deemed to have accepted the terms of any City directed change order unless the Contractor asserts a claim with respect to the change order, no later than ten (10) working days following the Contractor’s receipt of the change order. See General Provisions, Section 5.09`, “Disputed Work”. (b) Agreed Upon Change Orders - Within five (5) working days after receiving a request from the City for a written proposal for an agreed upon Change Order, the Contractor shall provide the Engineer with a cost proposal in a form satisfactory to the Engineer, setting forth the Contractor’s proposed adjustments to the contract sum and contract time for performing the extra work.

Compensation for agreed upon change orders shall be calculated based upon the unit prices stated in the Bid Schedule and no additional markup for overhead or profit will be provided unless stated otherwise as follows. If there are no unit prices for the extra work, the Contractor and the City may agree upon unit prices or lump sum costs, which shall be used to increase or decrease the contract sum. In the absence of any such agreement, the contract sum shall be adjusted by Force Account.

1. Quantity Adjustments - Unit prices shall govern not only for alterations to work covered by written specifications and drawings, but also for other work incidental or necessary to completing the work for which written specifications and drawings may be later prepared. Whenever an item of work or materials is specified in the contract by unit price and is increased or decreased by more than 25 percent (25%), Section 9-1.06 of the Standard Specifications shall govern payment. This Section allows for a renegotiation of the unit price based upon consideration of the total pay item cost. If, however, a renegotiated price cannot be reached by the Contractor and the City, then the payment for this item shall be adjusted by Force Account.

2. Agreed Upon Price – If there are no unit prices for proposed extra work, the Contractor and the City may agree upon unit prices or lump sum costs, by written change order, prior to commencing work. In the absence of any such agreement, the contract sum shall be adjusted by Force Account.

3. Force Account - When extra work is to be paid on a force account basis, the labor, materials and equipment used in the performance of that work shall be paid in accordance with the 2010 State Standard Specification, Section 9-1.04 “Force Account.” To the total of the direct costs computed, there can be an added markup of up to thirty-five percent (35%) to the cost of labor, up to fifteenpercent (15%) to the cost of materials and up to fifteen-percent (15%) to the cost of equipment. These markups shall constitute full compensation for any and all overhead costs, profit, or other costs not specifically designated as a cost of labor, material or equipment. When subcontractors perform force account work, an additional ten-percent (10%) markup shall be added to the total cost of the extra work to reimburse the Contractor for additional administrative costs. No markup for any Subcontractor beyond the first tier shall be paid.

During the performance of extra work by Force Account, and as a condition to the Contractor’s right to an adjustment of the contract sum, the Contractor shall prepare daily reports itemizing all costs for labor, materials, and equipment rental and provide certified payrolls. For labor costs, the reports shall include names, job classifications, hours worked and rates of pay. For equipment costs, the reports shall include size, type, identification number and hours of operation. All records and reports shall be submitted to the Engineer for approval on a daily

9.f
January 26, 2026 Packet Pg. 176
GP-24
basis. Reports shall be made on the State of California, Daily Extra Work Report Form or on a similar form approved by the Engineer.
i. Labor - Labor costs shall be based on the prevailing wage scale for each craft or type of workman, and no compensation shall be allowed for payment in excess of the prevailing wage. Employer payments for payroll taxes and insurance, health and welfare, pension, vacation, and other direct labor costs shall be included and will be calculated as the Labor Surcharge stipulated in the State of California, Labor Surcharge and Equipment Rental Rates book.
ii. Materials - Materials cost shall be the cost of all materials purchased by the Contractor and used in the extra work and shall be the actual cost of such materials, including sales taxes, freight and delivery charges. The City reserves the right to reject materials to be furnished by the Contractor, sources of supply or, if necessary, to furnish the materials to the Contractor. No compensation will be paid to the Contractor for any material furnished by the City or for materials not used. iii. Equipment Rental - The Contractor will be allowed the actual rental rate of equipment, prorated over the time the machinery or equipment is required. For Contractor owned equipment, this rate shall be as stipulated in the State of California, Labor Surcharge and Equipment Rental Rates book. In addition, the Contractor will be allowed reasonable move-in and move-out charges, if applicable. All equipment shall, in the opinion of the Engineer, be in good working order, good condition, and suitable for its purpose. Equipment or tools having a replacement value of $200.00 or less, whether or not consumed by use, shall be considered small tools and no payment will be made therefore. iv. Other Services or Expenditures - The City may authorize and approve payment for work performed by special forces or necessary services and expenditures other than labor, materials, and equipment rental.

5.09 Disputed Work - When the Engineer and Contractor fail to agree as to whether an alteration ordered by the Engineer constitutes a material change or difference in the character of the work, or fail to agree upon the compensation to be allowed for such altered work, the Contractor shall proceed with the altered work and file with the Engineer, within ten (10) working days after receiving direction from the Engineer, a written protest detailing the particulars of the dispute and the amount of additional compensation or time required for the alteration. Failure of the Engineer to recognize a change in the character of work when ordering alterations shall in no way be construed as relieving the Contractor of the Contractor’s duty and responsibility for filing a protest as prescribed above. The City will not consider additional compensation for altered work unless the Contractor files a written protest within ten (10) working days after receiving direction from the Engineer.

If the Contractor has complied with the notification requirements of this sub-section, consideration of payment due shall be made as later determined through claim resolution procedures as set forth in General Provisions, Section 10, “Measurement and Payment”.

Although not to be considered as approval for proceeding under extra work provisions, the Contractor shall keep and furnish records of disputed work in accordance with General Provisions, Section 5.07, “Extra Work”.

9.f
January 26, 2026 Packet Pg. 177
GP-25
SECTION 6 - CONTROL OF MATERIALS

6.01 Materials and Workmanship - All materials, parts and equipment furnished by the Contractor in the work shall be new, high grade, and free from defects. Workmanship shall be in accordance with generally accepted standards. Materials and workmanship shall be subject to the Engineer’s approval.

Materials and workmanship not conforming to the requirements of these specifications shall be considered defective and will be subject to rejection. Defective work or material, whether in place or not, shall be removed immediately from the site by the Contractor, at his expense, when so directed by the Engineer.

If the Contractor fails to replace any defective or damaged work or material after notice from the Engineer, the Engineer may cause such work or materials to be replaced. The replacement expense shall be deducted from the amount to be paid to the Contractor.

Used or secondhand materials, parts and equipment are permissible only if permitted by the Special Provisions.

Specialized material or equipment to be used in the work that is not readily available from material suppliers (such as electroliers, luminaries, signal poles, heads, cable, controllers, pumps, etc.) shall be ordered within five (5) days after award of the contract. Time extensions will not be granted for project delays due to the unavailability of such specialized material and equipment unless the Contractor furnishes the Engineer with documentation of purchase order dates, acceptable reason for delay of delivery, or proof of diligent efforts to obtain said items from alternate sources.

The Contractor shall provide the Engineer with periodic reports to inform the Engineer of any changes in the projected material or equipment delivery dates.

6.02 Protection of Work and Materials - The Contractor shall provide and maintain storage facilities and employ such measures as will preserve the specified quality and fitness of materials to be used in the work. Stored materials shall be reasonably accessible for inspection. The Contractor shall also adequately protect new and existing work and equipment for the duration of his contract.

The Contractor shall not, without the City’s consent, assign, sell, mortgage, hypothecate, or remove equipment or materials which have been installed or delivered and which may be necessary for the completion of the contract.

6.03 Trade Names or Equals – In accordance with Public Contract Code Section 3400, whenever any particular material, process, or equipment is indicated by patent, proprietary or brand name, or by the name of a manufacturer or supplier, such wording is used for the purpose of facilitating its description and shall be deemed to be followed by the words “or equal”.

Because products specified may have a uniqueness that can’t be matched, the Contractor must “bid” the work based upon the products specified. If, during the submittal process, an equivalent product is proposed by the contractor, the contractor shall provide data to show that the product is considered equal. Contractor shall also identify any price differences, which shall be considered as part of the substitution and if accepted, shall result in an appropriate credit or cost to the City by change order should the substitution be made.

Unless otherwise authorized by the Engineer, the proposed substitution must be submitted in sufficient time, before the normal use or installation of the material, process or equipment, for the Engineer to determine the equivalency and for the Contractor to make any required purchases (including delivery).

9.f
January 26, 2026 Packet Pg. 178
GP-26
The Engineer shall be responsible for solely determining whether the material proposed for substitution is equivalent to that specified, and the Engineer’s findings shall be final. If a substitute offered by the Contractor is found to be not equal to the specified material, the Contractor shall furnish and install the specified material.

The specified contract completion time shall not be affected by any circumstances developing from the provisions of this Section.

6.04 Inspection of Materials by City - Unless otherwise specified, inspection may be required at the source for such typical materials and fabricated items as bituminous paving mixtures, structural concrete, metal fabrication, metal casting, welding, concrete pipe manufacture, protective coating application, and similar shop or plant operations.

Standard items of equipment such as electric motors, conveyers, elevators, plumbing fixtures, etc., are subject to inspection at the job site. Special items of equipment such as designed electrical panel boards, large pumps, sewage plant equipment, etc., are subject to inspection at the source, normally only for performance testing. The Special Provisions may specify additional inspection requirements.

6.05 Inspection of Materials by Others - When the City does not elect to make its own inspection at the source, the City may, at its expense, engage an inspector or accredited testing laboratory to inspect the materials, equipment or process. The inspector or representative of the testing laboratory shall judge the materials by the requirements of the plans and specifications. No materials or equipment shall be shipped nor any processing, fabrication or treatment of such materials shall be done without a favorable inspection by the engaged agent. These materials shall be subject to re-inspection at the job-site.

6.06 Tests of Materials - Before incorporation into the work, the Contractor shall submit samples of materials, as the Engineer may require, at no cost to the City. The Contractor, at his own expense, shall deliver the materials for testing to the place, and at the time designated, by the Engineer.

Unless otherwise provided by the Special Provisions, all testing shall be performed under the direction of the Engineer, and at no expense to the Contractor.

The Contractor shall notify the City in writing at least fifteen (15) days in advance of his intention to use materials for which tests are specified, to allow sufficient time for the City to perform the tests. The notice shall name the proposed supplier and source of material.

6.07 Certification – The Engineer may waive material testing requirements of the Specifications and accept the manufacturer’s written Certificate of Compliance or test data demonstrating that the materials to be supplied meet the requirements of the specifications. A Certificate of Compliance is acceptable for authorizing the use of steel pipe in sizes less than eighteen (18) inches and vitrified clay, cast iron or ductile iron pipe in all sizes. All materials used on the basis of a Certificate of Compliance may be sampled or tested by the City at any time. The fact that material is used on the basis of a Certificate of Compliance shall not relieve the Contractor of the responsibility for incorporating materials in the work which conforms to the requirements of the Contract Documents.

6.08 Weighing and Metering Equipment – All scales and metering equipment used for proportioning materials shall be inspected for accuracy and certified within the past twelve (12) months by the State of California Bureau of Weights and Measures, by the County Director or Sealer of Weights and Measures, or by a scale mechanic registered with or licensed by the County, The accuracy of the work by a scale service agency, except as stated herein, shall meet the standards of the California Business and Professions Code and the California Code of Regulations pertaining to weighing devices. A certificate of compliance shall be presented to the Engineer for approval prior to operation, and shall be renewed whenever required by the Engineer at no cost to the City.

9.f
January 26, 2026 Packet Pg. 179
GP-27
All scales shall be arranged so they may be read easily from the operator’s platform or area.

They shall indicate the true net weight without the application of any factor. The figures of the scales shall be clearly legible. Scales shall be accurate to within one-percent (1%) when tested with the plant shut down. Weighing equipment shall be so insulated against vibration or moving of other operating equipment in the plant area such that the error in weighing with the entire plant running will not exceed two-percent (2%) for any setting nor one and one half percent (1.5%) for any batch.

6.09 Calibration of Testing Equipment – Testing equipment, such as but not limited to, pressure gages, metering devices, hydraulic systems, force (load) measuring instruments, and strainmeasuring devices shall be calibrated by a testing agency acceptable to the Engineer at intervals not to exceed twelve (12) months, and following repairs, modification, or relocation of the equipment.

Calibration certificates shall be provided when requested by the Engineer.

9.f
January 26, 2026 Packet Pg. 180
GP-28
SECTION 7 – UTILITIES

7.01 City’s Statutory Obligation - Pursuant to Government Code, Section 4215: “in any contract to which a public agency as defined in Section 4401 is a party, the public agency shall assume the responsibility, between the parties to the contract, for the timely removal, relocation, or protection of existing main or trunk line utility facilities located on the site of any construction project that is the subject of the contract, if such utilities are not identified by the public agency in the plans and specifications made a part of the invitation for bids. The contract documents shall include provisions to compensate the Contractor for the costs of location, repairing damage not due to the failure of the Contractor to exercise reasonable care, and removing or relocating such utility facilities not indicated in the plans and specifications with reasonable accuracy and for equipment on the project necessarily idled during such work. The Contract documents shall include provisions that the Contractor shall not be assessed liquidated damages for delay in completion of the project, when such delay was caused by the failure of the public agency or the owner of the utility to provide for removal or relocation of such utility facilities.”

7.02 Contractor’s Obligation to Identify and Protect Subsurface Infrastructure - The Contractor shall locate and protect service laterals, conduits, and appurtenances of any underground facility, the presence of which could be reasonably inferred from the Contract Documents or from the presence of visible facilities such as buildings, meters, and junction boxes, prior to doing any work that may damage any such facilities, or interfere with their service. Where underground main distribution conduits, such as water, gas, sewer, electric power, telephone, or cable television are shown on the plans, the Contractor shall assume that every parcel will be served by a service connection for each type of utility. The Contractor shall comply with all requirements for the protection of underground infrastructure as set forth in Government Code, Sections 4215 through 4216.9.

It shall be the Contractor’s responsibility to complete all work in a manner that satisfies utility company standards, providing if requested, detailed plans prepared by a California Registered Civil Engineer showing necessary temporary support of utilities during coordinated construction work. The Contractor is directed to contact these agencies before submitting bids and to be familiar with their requirements and shall include all costs of this coordination within the proposals bid prices.

The Contractor agrees to assume liability and to hold the City of San Carlos, its officers, and employees harmless from any damages resulting from the existence of underground utilities and structures not reported to the Engineer, not indicated on the public records examined, or located at variance with that reported or shown on records examined.

7.03 Location - The City will search known records and indicate on the plans those utilities, except service connections, which may affect the work. All available information regarding removal, relocation, or disconnection of utilities, or installation of new utilities, will be furnished to prospective bidders before the receipt of bids. The Contractor shall immediately report to the Engineer those utilities omitted from the plans or found substantially at variance with the location shown.

Existing and proposed utilities and improvements are shown in their approximate locations.

Locations may not have been field verified and no guarantee is made as to the accuracy and completeness of the information shown. The fact that any facility is not shown on the plans shall not relieve the Contractor of his responsibility under this Section. It shall be the Contractor’s responsibility to determine the existence and location of utilities shown on the plans, indicated by field locating services, or evidenced by facilities visible in the field. No additional compensation will be allowed for delays incurred as a result of the Contractor’s failure to field verify and/or pothole existing utilities prior to beginning construction. Potholing shall be considered as part of the various contract bid items and no additional compensation will be allowed.

At least three (3) working days prior to commencing work, the Contractor shall request that utility and agencies mark or otherwise indicate the location of their substructures. Contractor shall contact Underground Service Alert (USA) at (800) 642-2444 and the Engineer at least forty-eight (48) hours prior to excavation. The location of utilities as shown on the plans are approximate and are not to be construed as certainty. It shall be the Contractor’s responsibility to determine the true location and depth of all utilities and service connections affecting or conflicting with the work, prior to the performance of the

9.f
January 26, 2026 Packet Pg. 181
GP-29
work. As necessary, the Contractor shall pothole these utilities prior to working in the area to avoid damage to them. Potholing shall be considered as part of the contract bid items, and no separate payment will be made. Contractor shall familiarize himself with the type, material, age and condition of any utility which may be affected by the work.

7.04 Protection - As necessary or as directed by the Engineer, the Contractor shall field adjust proposed improvements to avoid conflicts with existing improvements. The Contractor shall not interrupt the service function or disturb the supporting base of any utility, without authority from the utility Owner or order from the City.

Where protection is required to ensure support of existing underground, overhead and at-grade utilities (including their associated structures and service connections) as shown on the plans, the Contractor shall furnish and place the necessary protection at his expense. In case of damage, the Contractor, without additional compensation, shall restore utilities to as good of a condition as they were found.

Upon learning of the existence and location of any utility omitted from or shown incorrectly on the plans, the Contractor shall notify the City and be fully responsible for protecting such utility. When authorized by the Engineer, additional protection may be paid by change order, for utilities other than a service connection.

The Contractor shall immediately notify the Engineer and the utility owner if he disturbs, disconnects or damages any utility. If the utility is located substantially as indicated on the plans, the Contractor shall bear the costs of repair or replacement.

When placing concrete around or contiguous to any utility, the Contractor shall at his expense, furnish and install a cushion of expansion joint material, clear opening, sleeve, or other suitable material approved by the Engineer so as to prevent embedment or bonding of the utility with the concrete.

7.05 Shut Down Notification – The City is in-charge of the sewer and storm water collection systems, traffic signals and street lighting system and as such the Contractor shall coordinate shut downs of these utilities and facilities with the City’s Engineer and Public Works Maintenance Department. The Contractor shall also coordinate the shutdown of all other utilities, including, but not limited to water, electricity, gas, communications, or CATV with the corresponding utility owner.

Shut downs of any utility or other facility, when allowed, shall be done only after:

A. The Contractor has coordinated with and notify the Engineer/Utility Owners in writing, at least seventy-two (72) hours in advance of the shut down, and, B. Has properly notified customers (residents, businesses/agencies) emergency response staff, and, C. Has all materials required for the work at the job site prior to requesting a shut off.

Except for scheduled shutdowns and in cases of emergency, the Contractor shall notify all customers and effected parties of a shutdown at least forty-eight (48) hours in advance by writing and four (4) hours in advance by person to allow adequate draw time. Once shut down, the Contractor shall proceed with the work in an expedient manner until the water lines or sewer lines are back in service.

7.06 Removal - Unless otherwise specified, the Contractor shall remove all portions of interfering utilities shown on the plans as ‘abandoned’ or “to be abandoned in place”. Before starting removal operations, the Contractor shall ascertain from the utility Owner whether abandonment is complete. The costs involved in the removal and disposal of utilities to be abandoned shall be considered as part of the contract bid items, and no separate payment will be made.

7.07 Relocation - When feasible, the utilities within the area affected by the work will complete their necessary installations, relocations, repairs, or replacements before commencement of work by the Contractor. When the Contract Documents or plans indicate that a utility is to be relocated, altered or constructed by others, the City will conduct all negotiations with the utilities and the work will be done at no cost to the Contractor.

9.f
January 26, 2026 Packet Pg. 182
GP-30
Utilities interfering with the permanent project work, discovered after the award of the contract, shall either be relocated, altered, or reconstructed by the utility, or the Engineer may order changes in the work to avoid interference. Such changes will be paid for in accordance with General Provisions, Section 5, “Changes in Work”.

When the plans or specifications provide for the Contractor to alter, relocate, or reconstruct a utility, all costs for such work shall be absorbed in the contract bid items. Temporary or permanent relocation or alteration of utilities by the Contractor for his own convenience shall be his responsibility, and he shall make all arrangements, obtain all approvals, and bear all costs. The Contractor may, for his own convenience or to expedite the work, agree with the owner of any utility to disconnect and reconnect interfering service connections. The City shall not be involved in any such agreement.

7.08 Delays - The Contractor is responsible for notifying utility companies in time to prevent delays attributable to utility relocations or alterations as called for in the Contract Documents. The Contractor shall not be entitled to damages or additional payment if such delay does occur. The Engineer will determine the extent of the delay based on the Baseline Construction Schedule (Section 8.05) and on the project as a whole, and any commensurate extension of time.

7.09 Cooperation - When necessary, the Contractor shall conduct his operations so as to permit access to the worksite and provide time for utility work to be accomplished during the progress of the contract work.

9.f
January 26, 2026 Packet Pg. 183
GP-31
SECTION 8 – PROSECUTION AND PROGRESS

8.01 Notice to Proceed - Within twenty-one (21) calendar days following receipt of the signed agreement, bonds and insurance, the City shall issue the Contractor a Notice to Proceed provided that the documents are acceptable to the City. Unless stated otherwise, the contract time shall commence upon the receipt date on the Notice to Proceed.

8.02 Commencement of Work - Work shall commence within fifteen (15) calendar days following the receipt date on the Notice to Proceed, and shall be diligently prosecuted to completion within the time provided in the Notice to Bidders.

8.03 Subcontracting - Unless otherwise indicated by the Special Provisions, the Contractor shall perform the majority of the project work.

8.04 Administrative Duties - The Contractor shall coordinate the scheduling and timing of administrative duties with other activities to avoid conflicts and to ensure orderly project progress. Such activities include, but shall not be limited to, the preparation of construction schedules, preparation and processing of submittals, requests for information and responding to requests for quotations, attending and preparing for progress meetings and coordinating project closeout activities.

8.05 Baseline Construction Schedule – Within ten (10) calendar days of the Notice to Proceed, the Contractor shall submit to the Engineer an acceptable Critical Path Method (CPM) progress schedule showing the critical path for completing the various items of work within the number of contract days specified. The schedule shall show the order in which the Contractor proposes to carry out the major items of work and the dates on which he will start and finish the various items (including procurement of materials and equipment). If requested, the schedule shall be resource loaded to reflect person/crew hours and equipment loading for various construction activities in order for the City to better evaluate the proposed schedule.
(a) City Review of Schedule – The City may review and note exceptions to the Contractor’s schedule, if it is not sufficiently detailed to clearly show the work to be completed during each month to assure the completion of the work within the project duration. The Contractor will be solely and exclusively responsible for resolving any exceptions, and the City’s review will not create any scheduling obligations of the City. Any noted corrections to the schedule shall be addressed within five (5) working days. (b) Update of Schedule – After submission of a schedule to which the City has taken no exceptions, the Contractor shall submit an updated schedule on a monthly basis or as otherwise specified by the City until completion of the work. The updated schedule must show the “As Constructed” progress up to the date for which the schedule has been prepared and reflect any proposed changes in the method of operations, to achieve the project milestones within the required project duration. (c) Float – The schedule must show early and late completion dates for each task. The number of days between these dates will be designated as “float”. The float will be assigned to the project and available for the City, at the Engineer’s discretion, to allocate the “float” to the Contractor as needed to complete the work in accordance with the agreement.
(d) Failure to Submit Schedule – If the Contractor fails to submit a schedule within the time periods specified in this sub-section, or submits a schedule to which the City has taken uncorrected exceptions, the City may withhold payments to the Contractor until such schedule is submitted and/or corrected in accordance with the Contract Documents.

8.06 Three-Week Look Ahead Schedule - The Contractor is required to furnish to the Engineer, on a weekly basis at the project’s progress meetings, a three-week look ahead schedule. The schedule must show planned activities in sufficient detail to allow proper monitoring of the planned construction activities.

9.f
January 26, 2026 Packet Pg. 184
GP-32

8.07 Construction Sequence - The Contractor shall prepare and submit at the pre-construction meeting a staging or phasing plan identifying the sequence of construction work and traffic control needed to complete the project. The staging plan shall be subject to review and approval by the Engineer, prior to the start of construction. The goal of the phasing plan will be to minimize impacts to surrounding businesses and residents in the project areas. When required by the Special Provisions or plans, the Contractor shall follow the sequence of operations as set forth therein.

8.08 Recording Existing Conditions - Existing conditions throughout the project site shall be photographed and/or videotaped by the Contractor before starting construction. Recording shall include and show every detail of existing improvements, including the current condition of the curb, gutter, sidewalk, signs, landscaping, streetlights, structures near the project including face of buildings, canopies, shades, fences and any other features within the limits of work. Photos and/or videotape shall be delivered to the Engineer at the pre-construction meeting.

8.09 Preconstruction Conference - The City shall designate a date and time for the preconstruction conference once the contract has been fully executed. At the pre-construction conference, the City shall discuss various administrative procedures and project coordination issues. At a minimum, the Contractor should be prepared to furnish and discuss the following:
(a) Letter designating the Superintendent.
(b) A list of key personnel and emergency contact information including telephone numbers to be used in case of emergency
(c) Sequence or phasing plans identifying the phasing of construction work and any alternative sequences for consideration.
(d) Traffic control plans associated with the staging plans (to be signed and stamped by a Licensed Traffic Engineer).
(e) A draft of the master Baseline Construction Schedule, in Critical Path Method (CPM) format (to be finalized no later than ten (10) days after the Notice to Proceed). (f) A breakdown of lump sum bid items to be used as a basis for determining the value of work completed on future progress payments.
(g) A submittal schedule listing all project submittals that will need to be reviewed and a listing of proposed material suppliers.
(h) Utility company coordination and/or permit issues.
(i) Videotape and/or photography of the project’s existing condition (to be completed prior to starting construction.
(j) Anticipated cash flow projections, if requested by the engineer.

8.10 Progress Meeting - The Contractor, Job Superintendent and Subcontractors, if requested by the City, shall attend weekly progress meetings to be scheduled by the Engineer at a time agreeable to both the Engineer and the Contractor. Contractor shall also attend special meetings in addition to regular progress meetings if necessary and directed by the Engineer.

8.11 Hours of Construction - Construction activities shall be limited to the hours of 8:00 a.m. to 6:00 p.m., unless otherwise noted or further restricted in the Contract Documents, or as directed by the Engineer. No work shall be done on weekends, holidays or outside these specified hours, unless otherwise approved by the Engineer. The Contractor shall take into consideration and coordinate time constraints for special events or activities organized by the City or other agencies. No mechanical equipment, including hauling or deliveries by trucks, shall start before 8:00 a.m. and all equipment must shut down before 6:00 p.m. unless approved by the Engineer.

8.12 Prosecution of Work - To minimize public inconvenience and possible hazards and to restore the streets and other work areas to their original condition and former state of usefulness as soon as practicable, the Contractor shall diligently prosecute the work to completion. If, in the Engineer’s

9.f
January 26, 2026 Packet Pg. 185
GP-33
opinion the Contractor fails to prosecute the work to the extent that the above purposes are not being accomplished, the Contractor shall, upon orders from the Engineer, immediately take the steps necessary to fully accomplish said purposes. All costs for prosecuting the work as described herein shall be absorbed in the Contractor’s bid. Should the Contractor fail to take the necessary steps to fully accomplish said purposes, after orders of the Engineer to do so, the Engineer may suspend the work in whole or in part, until the Contractor takes said steps. With or without such suspension, the Engineer may cause such steps to be taken by force account or by other means at the Contractors expense.

8.13 Suspension of Work - Work may be stopped or suspended in whole or in part for up to ninety (90) days when, in the Engineer’s opinion, the suspension is necessary and in the interest of the City. The Contractor shall immediately comply with any written order of the Engineer suspending work.

Such City directed suspension shall be without liability to the Contractor on the part of the City.

Suspended work shall be resumed upon written order of the Engineer. An extension of contract time equal to the period of suspension shall be issued to the Contractor by change order. Any claim by the Contractor for an adjustment of the contract sum or the contract time shall be made within ten (10) working days after the end of the work suspension.

If work is suspended through any fault of the Contractor, all expenses and losses incurred by the Contractor during such suspensions shall be borne by the Contractor. If the Contractor fails to properly provide for public safety, traffic, and protection of the work during periods of suspension, the City may elect to do so, and shall deduct the cost thereof from monies due the Contractor. Such action will not relieve the Contractor from any liability.

8.14 Default by the Contractor and Termination of Control - As a result of any of the following events, the Contractor shall be deemed to be in default:
(a) If the Contractor is in bankruptcy or makes a general assignment for the benefit of creditors, or
(b) If the Contractor fails to make prompt payment to subcontractors for labor or materials, or (c) If a receiver is appointed on account of the Contractor’s insolvency, or (d) If the Contractor fails to provide enough properly skilled workmen or enough materials to insure compliance with the construction time schedule, or (e) If the Contractor fails to perform any portion of the work within the timing requirements of the Contract Documents, or abandons the project site, or (f) If the Contractor disregards instructions from the Engineer or violates any provision of the contract, or
(g) If the Contractor fails to replace or repair any damage caused by the Contractor or its agents, representatives, contractors, subcontractors, or employees in connection with the performance of the work, or
(h) If the Contractor violates any legal requirement related to the work.

In case of default, the City may give written notice to the Contractor and the Contractor’s bonding agent that if the default is not remedied within ten (10) calendar days or the Contractor does not provide adequate written assurance to the satisfaction of the Engineer that the cure will be forthcoming, the Contractor’s control over the work may be terminated as of the date specified in the written notice.

Upon such termination of control the City may enter upon and take possession of the entire work and may also take possession, for the purpose of completing the work, of all of the Contractor’s tools, equipment and appliances upon the work, and all materials on the site or stored off-site for incorporation into the work. The City may, at its sole option and without further notice to anyone, complete the work by day labor, by contract entered into by negotiations, by competitive bidding, by calling upon the performance of the performance bond surety, or by other means as the City, in its discretion, shall elect.

After termination of the Contractor’s control over the work as herein provided, the Contractor shall not be entitled to any further payments under the contract until the entire work thereunder has been fully

9.f
January 26, 2026 Packet Pg. 186
GP-34
completed and finally accepted by the City. After such completion and acceptance, if the “unpaid balance of the contract price” (as defined in the next paragraph) exceeds the sum of the amounts expended by the City in taking over and completing the work, including all managerial and administrative expense incurred by the City on account thereof and the amount of all damages incurred by the City by reason of the Contractor’s default, such excess shall be paid to the Contractor. If the said amount expended exceeds the unpaid balance, the Contractor and his surety shall be liable to the City for the difference. At the Contractor’s request, the expense incurred by the City in taking over and completing the work, and the amount of any damage incurred by the City by reason of the Contractor’s default shall be audited and certified by an independent third party, whose certificate thereof shall be binding and conclusive upon the parties.

For the purposes of the computations required by the paragraph above, the “unpaid balance of the contract price” shall be the original contract price as adjusted by any change orders issued prior to termination of the Contractor’s control, less all payments made on account thereof prior to such termination, and less any and all amounts withheld or paid pursuant to stop notices filed with the City upon claims of subcontractors or others from equipment, labor or materials furnished to the work on behalf of the Contractor.

Upon completion and acceptance of the work, the Contractor shall be entitled to the return of all materials not used in the work, but without claim against the City for loss or damage with respect thereto, and shall be entitled to the return of all his equipment, tools and appliances taken possession of by the City, but without claim against the City for any charge for the use thereof or for usual and ordinary depreciation and wear and tear.

The exercise of remedies provided for in this sub-section, for default by the Contractor, shall be in addition to, and shall not be deemed a waiver by the City of any other rights or remedies due the City under the contract provisions, for default by the Contractor.

8.15 Contractor’s Right to Stop Work or Terminate Contract – The Contractor may give written notice to the Engineer of intention to stop work or terminate the Agreement, or both if the work should be stopped by order of any court or other public authority, through no act, omission or fault of the Contractor or any Subcontractor, agent or employee of the Contractor, and such work stoppage under such order shall continue for thirty (30) consecutive days from the effective date of such order If, after the Contractor provides notice to the City of any of the above defaults, the City does not remedy the default within ten (10) calendar days, the Contractor may stop work and may give the City written notice of contract termination. The Contractor may then recover from the City payment for all work executed to date and any loss sustained upon any equipment or materials procured for the work prior to the work stoppage. No compensation for loss of anticipated profits will be provided, however, on work not completed. The Contractor’s right to recovery shall be subject, however, to the duty of the Contractor to mitigate all loss or damage so far as reasonably possible.

8.16 City’s Right to Terminate Contract – The City may, at its option, terminate the Agreement, in whole or from time to time in part, at any time by giving notice to the Contractor. Upon such termination, the Contractor agrees to waive any claims for damages, including loss of anticipated profits, on account thereof; and, as the sole right and remedy of the Contractor, the City shall pay the Contractor in accordance with this sub-section. Upon termination, the obligations of the Contractor for portions of the work already performed shall continue.
(a) Upon receipt of a Notice of Termination, the Contractor shall, unless the notice directs otherwise, do the following:

1. Immediately discontinue the work to the extent specified in the notice.

2. Place no further orders or subcontracts for materials, equipment, services, or facilities, except as may be necessary to complete such portion of the work that are not to be discontinued.

9.f
January 26, 2026 Packet Pg. 187
GP-35

3. Promptly cancel, on the most favorable terms reasonably possible, all subcontracts to the extent that they relate to the performance of the discontinued portion of the work.

4. Thereafter do only such work as may be necessary to preserve and protect the work already in progress and to protect materials, plants, and equipment on the project site or in transit thereto.
(b) Upon such termination, the City shall pay to the Contractor as a sole and exclusive remedy for the termination, the sum of the following, and the Contractor will be entitled to no other compensation or damages, and expressly waives same:

1. The amount of the contract amount allocated to the portion of the work properly performed by the Contractor as of the date of termination, less sums previously paid to the Contractor, plus

2. Previously unpaid costs of any items delivered to the project site which were fabricated for subsequent incorporation in the work, plus

3. Any proven losses with respect to materials and equipment directly resulting from such termination, plus

4. Reasonable demobilization costs in excess of what would have been incurred if work were not terminated, plus

5. Reasonable costs for preparing a statement of the aforesaid costs, expenses, and losses in connection with such termination.

The City may terminate the Agreement at its own discretion or when conditions encountered during the work make it impossible or impracticable to proceed, or when the City is prevented from proceeding with the Agreement by act of God, by law, or by official action of a public authority.

8.17 Time of Completion and Days Charged - The Contractor shall diligently prosecute and fully complete the work within the number of calendar or working days set forth in the Notice inviting Sealed Proposals or shall be subject to liquidated damages. Time is of the essence in the performance of all obligations under the Contract Documents, and all timing requirements shall be strictly adhered to unless otherwise modified by the City. See General Provisions, Sections 8.12, “Prosecution of Work”, and 8.18, “Liquidated Damages”.

Under a calendar day contract, City observed holidays and inclement weather delays are to be anticipated and unless there is a deviation from what is customary for the time of year the project is under construction, no additional days will be granted. Every day, including holidays, Saturdays and Sundays shall be counted as a day charged under a calendar day contract.

Under a working day contract, the Contractor will be given credit for City observed holidays and inclement weather delays, in accordance with the State Standard Specifications. Should the Contractor prepare to begin work at the regular starting time in the morning of any day on which inclement weather, or the conditions resulting from the weather prevents the work from beginning at the usual starting time and the crew is dismissed as a result thereof and the Contractor does not proceed with at least seventyfive percent (75%) of the normal labor and equipment force engaged in the current controlling operations for at least sixty percent (60%)of the total daily time being currently spent on the controlling operations, the Contractor will not be charged for a working day whether or not conditions should change thereafter.

8.18 Liquidated Damages - The City and the Contractor, by execution of the agreement, each agree that time is of the essence in the performance of the work, and that actual damages for inconvenience and loss from any delay in completion of the contract beyond the date provided in the Notice to Bidders is extremely difficult or impossible to determine.

The City and the Contractor further agree, as specified in the Notice to Bidders, that liquidated damages shall be assessed for each and every calendar day required to complete the contract in excess of the contract time established for the project, and that the amount stated therein is a reasonable

9.f
January 26, 2026 Packet Pg. 188
GP-36
estimate of the amount of such damages. The Engineer may deduct any liquidated damaged owed to the City, as determined by the Engineer from any payments otherwise payable to the Contractor under this agreement.

In addition, the City shall have the right to charge to the Contractor and to deduct from the final payment for the work the actual cost to the City of engineering, inspection, administration and other overhead expenses which are directly chargeable to the contract and which accrue during the period of such delay, except that the cost of final surveys and preparation of the final estimate shall not be included in such charges.

Separate from the above-mentioned liquidated damages, the Contractor shall be responsible for paying all damages incurred by private businesses (residential, commercial or industrial), schools and hospitals due to non-completion of the project by the date specified.

Nothing contained herein shall limit the City’s rights or remedies against Contractor for any default other than failure to complete the work within the contract time. This provision for liquidated damages shall not be applicable nor act as a limitation upon the City if the Contractor abandons the work.

In such event, the Contractor shall be liable to the City for all losses incurred.

The date of the Engineer’s Certificate of Substantial Completion shall be the termination date, if applicable, of liquidated damages.

8.19 Delays and Extensions of Time
(a) Excusable Delays - shall mean delays in the prosecution or completion of the work which result from causes beyond the control of the Contractor and City and which could not have been avoided by the exercise of care, prudence, foresight, and diligence on the part of the Contractor, suppliers, or any tier of the Contractor’s subcontractors. Excusable Delays fall into the following categories:

1. Abnormal Delays – Excusable Delays caused by acts of god, fire, unusual storms, floods, tidal waves, earthquakes, strikes, labor disputes, freight embargoes, and shortages of materials insofar as they prevent the Contractor from proceeding with at least seventy-five percent (75%) of the normal labor and equipment force for at least five (5) hours per day toward completion of the current critical path activity.

2. Weather Delays – Excusable Delays due to inclement weather conditions or the conditions resulting from weather prevent the Contractor from proceeding with seventy-five percent (75%) of the normal labor and equipment force engaged in the current critical activity item for a period of at least five (5) hours per day toward completion of the current critical path activity.

3. Material Shortage Delays – Excusable Delays due to shortages of material, provided that the Contractor submits satisfactory proof to the Engineer. For the proof to be satisfactory, the Contractor must demonstrate that he has made every effort to obtain the materials from all known sources within reasonable reach of the proposed work. Only the physical shortage of material, caused by unusual circumstances, will be considered under these provisions as an excusable delay, and no consideration will be given to any claim that material could not be obtained at a reasonable, practical, or economical price, unless it is shown to the satisfaction of the Engineer that such material was only available at exorbitant prices. A material shortage delay will not be considered for material ordered or delivered late or for material whose availability is affected by virtue of mishandled procurement. The above provisions shall apply equally to equipment to be installed in the work.
(b) Compensable Delays - shall include delays that occur in the prosecution or completion of the work, through no fault of the Contractor which prevent the Contractor from proceeding with at least seventy-five percent (75%) of the normal labor and equipment force for at

9.f
January 26, 2026 Packet Pg. 189
GP-37
least five (5) hours per day toward completion of the current critical activity item(s) on the latest favorably reviewed progress schedule due to the following causes:

1. Delays due solely to the actions and/or inactions of the City.

2. Delays due to changed conditions as defined in General Provisions, Section

5.05, “Requests for Information, Inconsistencies and Changed Conditions”.

3. Delays due to other Contractors employed by the City who interfere with the Contractor's prosecution of the work as defined above.
(c) Inexcusable Delay - means any delay in the completion of the work beyond the expiration of the contract time resulting from causes other than Excusable Delays or Compensable Delays. An Inexcusable Delay shall not entitle the Contractor to an extension of the contract time or an adjustment of the contract sum. In addition to liquidated damages for inexcusable delays, the Contractor agrees to pay the City’s actual costs, including charges for engineering, inspection and administration incurred during the delay. (d) Concurrent Delays - those periods of delay when the prosecution of the work is delayed during the same period of time due to causes from a combination of the delays defined as Excusable, Compensable or Inexcusable.

If the Contractor desires an extension of time, he shall file a written request based upon the delays reported. The Engineer will ascertain the facts, the extent of the delays, and the effect upon the entire project, and the City will grant an extension of time equivalent to verified time lost. The request for an extension of time must be made no later than ten (10) working days after the start of the condition that purportedly caused the delay, and no later than fifteen (15) working days after the date on which performance on the condition purportedly causing the delay has ended.

Contractor may make a delay claim for an extension of the contract time for an Excusable Delay or a Compensable Delay. If an Excusable Delay and a Compensable Delay occur concurrently, the maximum extension of the contract time shall be the number of calendar days from the commencement of the first delay to the cessation of the delay which ends last. If an Inexcusable Delay occurs concurrently with either an Excusable Delay or a Compensable Delay, the maximum extension of the contract time shall be the number of calendar days, if any, by which the Excusable Delay or the Compensable Delay exceeds the Inexcusable Delay.

For a Compensable Delay, the Contractor may make a delay claim for an adjustment in the contract sum in an amount equal to the sum of the actual and unavoidable additional costs of labor, material, and equipment furnished at the site by the Contractor or subcontractors, including wages, salaries, fringe benefits and payroll taxes.

Extensions of time, when granted, will be based upon the effect of delays to the project as a whole and will not be granted for non-controlling delays to minor portions of the work unless it can be shown that such delays did, in fact, delay the progress of the project as a whole. For purposes of determining delays, all float associated with the project schedule shall belong to the project. See General Provisions, Section 8.05, “Baseline Construction Schedule”.

If delays are caused by unforeseen events beyond the control of either the Contractor or the City, such delays will entitle the Contractor to an extension of time as provided herein, but the Contractor shall not be entitled to damages or additional payment due to these delays. War, governmental regulations, labor disputes, strikes, fires, floods, adverse weather necessitating cessation of work, other similar action of the elements, inability to obtain materials, equipment, or labor because of Federal Government restrictions arising out of National Defense, required extra work, action or inaction by the City, or other specific reasons as may be further described in the specifications may constitute such a delay. If delays beyond the Contractor’s control are caused by reasons other than those mentioned above, but are substantially equal in gravity to those enumerated, an extension of time may be granted, if deemed by the Engineer to be in the best interests of the City.

9.f
January 26, 2026 Packet Pg. 190
GP-38
The Contractor shall be entitled to an extension of time if delayed due to a failure of the City to furnish necessary right-of-way or materials which the City agreed to furnish, or by the City’s failure to supply necessary plans or instructions concerning the work, after written request by the Contractor.

For Compensable Delay periods resulting in indirect overhead expenses, the Contractor shall be reimbursed as provided for in General Provisions, Section 5, “Changes in Work”.

8.20 Substantial Completion – When work in accordance with the Contract Documents has progressed to a stage of one-hundred percent (100%) complete, as determined by the Engineer, except for the completion of minor punch list items of deficiencies or omissions in the work which require correction in order to satisfy the agreement, yet do not impair the City’s ability to occupy and fully utilize the work for its intended purpose, the project shall be deemed “Substantially Complete”. Portions of the work may also be designated by the City as substantially complete if the Contract Documents require separate delivery.

When the Engineer determines that the work or such designated portions of the work are substantially complete, the Engineer will prepare and sign a Certificate of Substantial Completion. The date of substantial completion shall establish the date at which days charged against the project duration shall terminate. The date of substantial completion shall also establish the date of occupancy by the City and the transfer of responsibility from the Contractor to the City for such items as security, maintenance, heat, utilities, insurance, and damage to the work from causes other than that of the Contractor. Unless otherwise indicated in the Certificate of Substantial Completion, the Contractor’s guarantee for the work shall commence upon the date of substantial completion. See General Provisions, Section 11.01, “Contractor’s Guarantee”.

8.21 Project Closeout - After the Contractor has received the Certificate of Substantial Completion and has only minor work remaining, project closeout may begin. The following items and procedures are required as part of the project close out process. (a) Following the completion of punch list items, the Contractor shall make a written request to the city to conduct a final inspection. The written request shall be accompanied by a Certification that the work has been performed in accordance with the Contract Documents.
(b) Within fourteen (14) days of receipt of the Contractor's Certificate of Completion, a final inspection will be scheduled and conducted by the City. As a result of the inspection, the City will advise the Contractor of any work that must be completed or corrected before Acceptance, in the form of a punch list.
(c) The City will conduct a re-inspection of the punch list items within when requested by the Contractor, in writing, with assurances that the punch list requirements have been met.

Any charges by a Consulting Engineer/Architect hired by the City to do repeat reinspection of the punch list may be recovered from the Contractor. (d) The contractor shall provide a final payment request with lien releases (if applicable) in a format acceptable to the City.
(e) The as-built drawings and all record documents and shall be provided to the City by the Contractor including but not limited to, equipment operation and maintenance manuals, copies of warranties, shop drawings, product data, etc. Record documents shall be properly identified and organized into binders.

8.22 Final Completion - After the Contractor has received the Certificate of Substantial Completion along with the punch list, and has completed the items identified as necessary for project closeout, the Engineer will make a determination as to if the work is fully completed and in accordance with the Contract Documents. If so, the Engineer will recommend final acceptance to the City Council.

Should it become necessary, due to developed conditions, for the City to occupy any portion of the work, or any part of any structure or equipment, before the contract is completed or accepted, such occupancy shall not constitute an acceptance of any part of the work, unless so stated in writing by the City.

9.f
January 26, 2026 Packet Pg. 191
GP-39

8.23 Final Acceptance – Final acceptance by the Engineer will be considered after the work has been fully completed. A Notice of Completion will be filed with the County Recorder once Final Acceptance has been made.

8.24 Risk of Loss - The Contractor shall be responsible for the charge, care and protection of the project and shall bear all risks of injury or damage to the work, materials or equipment delivered to the site, by any means including fire, earthquake, wind, storm or other action of the elements, vandalism, or loss by theft, from the date of Notice to Proceed to the date of the filing of the Notice of Completion by the Engineer. The Contractor shall rebuild, repair, restore and make good all injuries or damage to any portion of the work, and shall bear the entire expense thereof, except such injuries or damages that are caused by riot, insurrection, acts of the Federal or State Government, or a public enemy in time of war.

8.25 Use of Improvements During Construction - The City reserves the right to take over and utilize all or part of any completed facility or appurtenance. Such action by the City will not relieve the Contractor of responsibility for injury or damage to said completed portions of the improvement resulting from use by public traffic, from the action of the elements or from any other cause attributable to the Contractor’s operations or negligence. The Contractor will be required to restore such portions of the improvement before final acceptance. Nothing in this Section shall be construed as relieving the Contractor from full responsibility for correcting defective work or materials.

9.f
January 26, 2026 Packet Pg. 192
GP-40
SECTION 9 —RESPONSIBILITIES OF THE CONTRACTOR

9.01 Contractor’s Responsibility for the Work - The Contractor shall supervise, coordinate, and direct the work using Contractor’s best skill and attention. Contractor shall have control over and be solely responsible for construction means, methods, techniques, sequences, procedures, and the coordination of all portions of the work in accordance with the terms of the Contract Documents until the completion and final acceptance of the work by the City. The Contractor shall furnish and maintain in good condition all equipment and facilities as required for the proper execution and inspection of the work. Such equipment and facilities shall meet all requirements of applicable ordinances and laws.

The Contractor shall rebuild, repair, restore and make good all injuries, damages, re-erections and repairs occasioned or rendered necessary by causes of any nature whatsoever, excepting only acts of God and none other, to all or any portions of the work, excepting as otherwise stipulated.

9.02 Contractor’s Responsibility for Subcontracted Work - The City will deal directly with, and make all payments to the Contractor only. The Contractor shall be responsible for the coordination of all trades, subcontractors, and suppliers engaged upon the work. Neither the City nor the Engineer will undertake to settle any differences between the Contractor and his subcontractors.

All persons engaged in the work, including subcontractors, will be considered as employees of the Contractor. The Contractor will be held responsible for their work and shall be responsible to the City for acts and omissions including those by their respective agents and employees.

When subcontracted work is not prosecuted in a manner satisfactory to the Engineer, the Contractor shall be notified to take corrective action within a specified time. If timely correction is not made, then upon receipt by the Contractor of written instructions from the Engineer, the Subcontractor shall be removed immediately from the work and shall not be reemployed.

9.03 Superintendent - The Contractor shall employ, and provide a written letter designating a superintendent and/or representative and all their contact information. The superintendent and/or representative shall be present on the job site whenever work is in progress to coordinate all work with the City and neighboring property owners, and who shall be available by phone twenty-four (24) hours per day, seven (7) days a week up to the Final Acceptance of the work by the City. A backup representative may also be provided. A joint venture shall designate only one Superintendent.

City approval of the Superintendent is required prior to starting work. The City reserves the right to request an appropriately qualified replacement of the Superintendent any time during construction of the project. Contractor shall provide the Engineer with the Superintendent’s telephone number, along with an after-hours emergency contact number of a responsible person who shall correct hazardous situations, should they occur, during times other than the normal working hours.

Directions and information given to the Superintendent shall be considered as having the same effect as if delivered to the Contractor and the Superintendent shall have full authority to execute the same and to supply materials, tools and labor without delay, and who shall be the legally appointed representative of the contractor. Contractor shall be liable for the faithful observation of any instructions delivered to him or to his appointed representatives.

9.04 Character of Workers - Contractor shall provide competent, fully qualified personnel to perform the work and shall at all times maintain good discipline and order among its employees and Subcontractors. Any employed person or Subcontractor who is found to be incompetent, intemperate, troublesome, disorderly or otherwise objectionable or who fails or refuses to perform his work properly and acceptably, shall be immediately removed from the work by the Contractor and shall not be reemployed. Such discharge shall not be the basis of any claim for compensation or damages against the City of San Carlos or any of its officers, employees or agents.

9.05 Laws to be Observed - The Contractor shall keep himself fully informed of, and at all times observe and comply with all Federal, State and County laws, including those of CAL-OSHA; all

9.f
January 26, 2026 Packet Pg. 193
GP-41
municipal ordinances and regulations of the City of San Carlos; and all orders and decrees of bodies having jurisdiction over the work. The Contractor shall also cause all agents and employees engaged on the project to observe and comply with all such laws, and shall protect and indemnify the City of San Carlos and all officers, employees, and agents thereof connected with the work against any claim or liability arising from or based on the violation of any such law (a) Non-Discrimination – Attention is directed to Labor Code, Section 1735 which reads as follows: “No discrimination shall be made in the employment of persons upon public work because of the race, religious creed, color, national origin, ancestry, physical handicap, medical condition, marital status or sex of such persons, except as provided in Government Code, Section 12940 and every Contractor for public works violating this Section is subject to all the penalties imposed for a violation of this chapter.” (b) Noncitizen Labor - The Contractor shall forfeit as penalty to the City of San Carlos fifty dollars ($50.00) for each noncitizen with no permit to work in the United States of America (USA) knowingly employed in the contract, by him or by any Subcontractor under him upon any of the work herein mentioned, for each calendar day, or portion thereof, during which such noncitizen is permitted or required to labor in violation of the provisions of the Labor Code and in particular Sections 1850 to 1854 thereof, inclusive. (a) Hours of Labor – Hours of labor shall be pursuant to Labor Code, Sections 1810.

Pursuant to Labor Code, Sections 1813, Contractor shall forfeit to the City, as a penalty, twenty-five dollars ($25.00) for each worker employed in the execution of this Agreement by Contractor, or any Subcontractor in violation of the terms of this Section or in violation of the provision of any law of the State of California. Such forfeiture amounts may be deducted from the contract sum. Contractor and each Subcontractor shall keep, or cause to be kept, an accurate record showing the actual hours worked each calendar day and each calendar week by each worker employed on the project, which record shall be kept open at all reasonable hours to the inspection of the City, its officers and agents, and to the inspection of the appropriate enforcement agency of the State of California. (d) Prevailing Wage – As identified in the Notice to Bidders, the work contemplated by this agreement is a public work subject to prevailing wages under California Labor Code, Sections 1720 et. seq. The State of California Department of Industrial Relations has ascertained the general prevailing per diem wage rates in the locality in which the work is to be performed for each craft, classification, or type of worker required to perform the work. A schedule of the most recent general prevailing per diem wage rates made available to the City will be on file at the City’s principal facility office and will be made available to any interested party upon request. This prevailing wage rate schedule is provided by the City for Bidder’s information only and is not guaranteed by the City to be current. Contractor is obligated to verify all appropriate prevailing wage rates and pay those rates as required. By this reference the verified current schedule of prevailing wage rates is made part of the Contract Documents. Contractor shall pay not less than the prevailing per diem wage rates, as specified in the schedule and any amendments thereto, to all workers employed by Contractor in the execution of the work. Contractor shall cause all subcontracts to include the provision that all Subcontractors shall pay not less than the specified prevailing per diem wage rates to all workers employed by such Subcontractors in the execution of the work.

Contractor shall forfeit to the City, as a penalty, no more than fifty-dollars ($50.00) for each calendar day or portion thereof for each worker that is paid less than the specified prevailing per diem wage rates for the work or craft in which the worker is employed for any portion of the work done by Contractor or any Subcontractor in violation of the provisions of the Labor Code, and in particular Sections 1770 to 1781 thereof, inclusive.

Such forfeiture amounts may be deducted from the contract sum. Contractor shall also pay to any worker who was paid less than the specified prevailing per diem wage rate for the work or craft for which the worker was employed for any portion of the work, for each calendar day, or portion thereof, for which the worker was paid less than the specified prevailing per diem wage rate, an amount equal to the difference between the specified prevailing per diem wage rate and the amount which was paid to the worker.

9.f
January 26, 2026 Packet Pg. 194
GP-42
The City will not recognize any claim for additional compensation because of the payment by the Contractor for any wage rate in excess of prevailing wage rates set forth in the Agreement, including payment in excess of the prevailing wage for extra work paid by force account. The possibility of wage increases is one of the elements to be considered by the Contractor in determining the Contractor’s bid and will not, under any circumstances be considered as the basis of a claim against the City under the Agreement.
(e) Payroll Records - Pursuant to Labor Code, Sections 1776, Contractor and all Subcontractors shall keep an accurate payroll record, showing the name, address, social security number, job classification, straight time and overtime hours worked each day and week, and the actual per diem wages paid to each journeyman, apprentice, worker, or other employee employed in connection with the work. All payroll records shall be certified as being true and correct by Contractor or Subcontractors keeping such records; and the payroll records shall be provided to the City no later than three weeks after closing of payroll. The Contractor and all Subcontractors must also furnish electronic certified payroll records to the Labor Commisioner of the State of California, Department of Industrial Relations.
(f) Apprentice Program - Attention is directed to State of California Labor Code, Sections 3095, 1777.5, 1777.6, and 1777.7 and Title 8, California Code of Regulations, Section 200, and the applicable Sections that follow. Responsibility for compliance with these requirements lies with the Contractor. To ensure compliance and complete understanding of the law requiring apprentices, and specifically the required ratio thereunder, Contractor or Subcontractors should, where some question exists, contact the Division of Apprenticeship Standards, 425 Golden Gate Avenue, 4th Floor, San Francisco, California, 94102 or one of its branch offices prior to commencement of the work. In the event Contractor willfully fails to comply with this Section, it will be considered in violation of the requirements of the Contract.

Nothing contained herein shall be considered or interpreted as prohibiting or preventing the hiring by Contractor or Subcontractors of journeyworker trainees who may receive onthe-job training to enable them to achieve journeyworker status in any craft or trade under standards other than those set forth for apprentices.
(g) Safety Program – the Contractor shall conform to the rules and regulations pertaining to safety established by the California Division of Industrial Safety and to all requirements as set forth in the State of California Construction Safety Orders (CAL-OSHA), and in particular, Article 3 of these Safety Orders, regarding Accident Prevention and safety meetings. Within ten (10) working days following the Notice of Award the Contractor shall provide a copy of the Contractor’s Safety Plan. The price paid for the plan is included in the various contract items of work and no additional compensation will be made therefore.

9.06 Permits and Fees – Unless otherwise stated in the Special Provisions, the Contractor shall procure all permits, registrations and licenses, including a City business registration, pay all charges and fees, and give all notices necessary for lawful prosecution of the work. All permits, registrations, licenses, and other authorizations shall be secured in sufficient time to prevent delays to the work. The Contractor shall comply with the provisions of said permits, licenses and other authorizations. The contractor shall submit satisfactory proof to the City, prior to issuance of the Notice to Proceed, that such permits, registrations or licenses are and will be in effect throughout the entire life of this contract. The contractor shall keep all permits, registrations and licenses posted on the job site.

For City Capital Improvement Construction Projects, the Contractor shall obtain a “No Fee” encroachment and/or building permit. Contractor shall coordinate through the Engineer to insure that all appropriate construction inspections occur.

9.07 Coordination and Cooperation - Construction work by utility companies or other Contractors may be needed or may be occurring simultaneously within or adjacent to the limits of work for this project. The Contractor shall coordinate and cooperate with all other Contractors and utility companies

9.f
January 26, 2026 Packet Pg. 195
GP-43
throughout the duration of this project to avoid delays and minimize interference and conflicts. Cooperation will be required in the arrangement for the storage of materials, and in the detailed execution of the work.

It is the Contractor’s responsibility to ascertain the nature of work by others, coordinate his work, and install, modify, and maintain traffic control as necessary to avoid interferences and delays on the construction activities. Failure of the Contractor to keep informed of the work progressing on the site and failure to give written notice of lack of progress or defective workmanship by others shall be construed as acceptance by the Contractor of the status of the work as being satisfactory for proper coordination with his own work.

Where the work of one trade joins or is on the other’s work, there shall be no lack of continuity or discrepancy when work is completed. In conforming one kind of work with another, marring or damaging other work will not be permitted. Should improper work of any trade be covered by another which results in damage or defects, the whole work affected shall be made good by the Contractor without expense to the City.

The City reserves the right to perform work or allow others to perform work, as necessary, within or adjacent to the limits of this project, at any time. If the Contractor or any of his Subcontractors or employees causes loss or damage to any separate Contractor on the work, the Contractor, by agreement or arbitration, if he deems it necessary, will settle any claim for such loss or damage. If such separate Contractor shall sue the City, on account of any loss so sustained, the City shall notify the Contractor, who shall indemnify and hold harmless the City against any loss or damage arising therefrom, including the cost and expense of defending any such suit.

If any portions of the work specified herein are to be installed in any right-of–way owned by the State, County, Municipality, or other public entities or public utilities, it shall be incumbent upon the contractor to familiarize described above will necessarily be subject to their inspection and approval before acceptance of these portions of the work by the Engineer. Any costs for inspection by agents other than those of the City shall be borne by the contractor. Where other agencies have jurisdiction over some portion of the work, and the requirements of the agencies are at variance with this specification, then that portion of the work shall be done in accordance with the requirements of the agency(ies).

The Contractor shall absorb in his bid all costs involved in coordinating his work with others. The Contractor will not be entitled to additional compensation from the City for damages resulting from such simultaneous, collateral and essential work.

9.08 Use of Premises - The Contractor shall confine construction activities to the project limits; which shall consist of right-of-way, easements and/or property owned by the City of San Carlos. With prior approval of the Engineer, adjacent street right-of-way may also be utilized for day-to-day operations.

Unless approved by the Engineer, no storage of materials and equipment will be allowed to remain within the right-of-way during non-working hours, on the weekends, or during holidays.

Each day, after the completion of construction operations, unless otherwise approved by the Engineer, the project limits shall be secured and made accessible to the public. All excess materials and equipment not protected by approved traffic control devices (such as k-rails) shall be relocated to a staging area or demobilized. Trench spoils shall be off-hauled daily and open excavations shall be protected with steel plates.

Personnel of Contractor and Subcontractors shall not occupy, live upon, or otherwise make use of the project site during any time that work is not being performed at the project site, except as otherwise provided for in the Contract Documents for issues such as site security.

9.09 Construction Staging and Field Office - If additional space beyond the construction limits is necessary for staging, the Contractor shall, at his own cost and initiative, make special arrangements with neighboring property City(s) to secure a staging area for a field office and/or material and equipment storage. The staging area must be fenced, with screening, and shall be operated in a manner that minimizes the inconvenience to neighbors.

The Contractor is encouraged to negotiate side agreements with the property owners of such sites prior to submitting bids. Prior to occupying the staging area, the Contractor will be required to provide

9.f
January 26, 2026 Packet Pg. 196
GP-44
to the Engineer a copy of the agreement or temporary construction easement granted by the property owner. A written release from the property owners or City, holding the City harmless from liability, will also need to be provided. In addition to approval from the property owners, the Contractor may also need to secure a Use Permit from the City’s Planning Division.

9.10 Site Security - Contractor shall be responsible for the care and custody of work and the site, including all necessary security provisions, on a 24-hour per day basis throughout the entire term of the Agreement. The Contractor shall provide and maintain storage facilities and employ such measures as will preserve the specified quality and fitness of materials to be used in the work.

9.11 Construction Water – The Contractor is responsible for obtaining all water required for the project and shall work with, and obtain all permits from, the appropriate water purveyor prior to obtaining construction water. If hydrant water is to be used, the Contractor must first obtain a hydrant meter and pay all related expenses. Direct connections to hydrants without a meter are not allowed. If water trucks are used, they shall be installed with backflow prevention devices. The cost of water, including all associated fees, deposits or permits shall be incorporated into the various bid items and no separate payment shall be made. Water purveyors include:

California Water Service Company Mid-Peninsula Water District Bayshore District - Customer Center 3 Dairy Lane
341 North Delaware St. P.O. Box 129
San Mateo, CA 94401-1727 Belmont, CA 94002
M-F: 8 a.m. to 4:30 p.m. M-F: 8 a.m. to 4:30 p.m.

Tel.: (650) 558-7800 Tel.: (650) 591-8941
[email protected] midpeninsulawater.org

9.12 Project Site Maintenance – All work identified in this section shall be considered as part of the contract bid items, and no separate payment will be made thereof. (a) Disposal of Material - Unless otherwise shown on the plans or specified herein, all excess materials and materials removed from existing improvements shall become the property of, and be disposed by the Contractor. The Contractor shall be responsible for all costs associated with disposing all excess materials in a safe and legal manner. No material shall be placed on private or public property without prior approval from the City and the property owner. The Contractor shall not allow any refuse, excavated material, surplus concrete or mortar, or any associated washings, to be disposed upon paved streets, into manholes or into the City’s storm drain system.

Contractor shall establish a system for daily collection and disposal of waste materials from construction areas and elsewhere on the site. Contractor shall handle waste materials that are hazardous, dangerous, or unsanitary separately from inert waste by containerizing appropriately. Burning or burying of waste materials on site will not be permitted.

All materials removed from the existing improvements, which in the opinion of the Engineer have salvage value, shall be delivered to the City Corporation Yard at 1000 Bransten Road, San Carlos, or at any other site designated by the Engineer within the City and shall be considered as part of the contract bid items, with no separate payment will be made thereof.
(b) Cleanup and Dust Control – at all times during construction, including weekends and holidays, and throughout all phases of construction, including work suspensions and until final acceptance of the project, the Contractor shall keep the work site clean and free from rubbish, debris, and prevent the formation of an airborne dust nuisance.

Materials and equipment shall be removed from the site as soon as they are no longer necessary. Upon completion of the work and before final inspection, the entire site shall be cleared of equipment, unused materials, and rubbish so as to present a satisfactory clean and neat appearance.

9.f
January 26, 2026 Packet Pg. 197
GP-45
The Contractor shall abate dust nuisance by cleaning, sweeping, and sprinkling with water, those excavated areas of dirt or other materials which are prone to causing dust, within both the project site and the storage or staging area. If required or directed by the Engineer, the Contractor shall provide an approved water truck of large capacity with spraying capability and/or street sweeper.

The Contractor shall be required to apply water for dust control immediately during construction efforts and within one (1) hour after notification by the Engineer that an airborne nuisance exists. If dust control is not adequate, in the opinion of the Engineer, the Engineer will have this work performed by others and will deduct such cost from the total contract price.

All hauling trucks or other construction vehicles leaving the site shall be cleaned of mud or dirt clinging to exterior body surfaces or wheel rims before traveling on City streets outside the work limits. All trucks coming to or leaving the site with materials or loose debris shall be loaded in a manner, which will prevent the dropping of materials or debris on City streets. Spillage resulting from hauling operations along or across any public traveled way shall be removed immediately.

When construction operations cause dirt to be deposited on public streets, the Contractor shall immediately remove such material. Streets shall be cleaned by street sweeping, rather than flushing, so as to prevent mud from entering the storm drain system.

Excess excavated material shall be removed from the site immediately. Sufficient material may remain for use as backfill if permitted by the specifications. Forms and form lumber shall be removed from the site as soon as practicable after stripping.

Failure of the Contractor to comply with the Engineer’s cleanup orders may result in an order to suspend work until the condition is corrected. No additional compensation will be allowed as a result of such suspension.
(c) Air Pollution Control - The Contractor shall not discharge smoke, dust, or any other air contaminants into the atmosphere in such quantity as will violate the regulations of any legally constituted authority.
(d) Noise Control - The Contractor shall make every reasonable effort to control noise generated as a result of construction to the satisfaction of the Engineer. Use of an air compressor, jackhammer or other loud, vibrating sound generating device shall be limited to operations between the hours of 8:00 a.m. and 6:00 p.m. Monday thru Friday and between 9:00 a.m. to 5:00 p.m. on Saturday and Sunday, unless otherwise authorized by the Engineer.
(e) Vermin Control - At the time of acceptance, structures entirely constructed under the contract shall be free of rodents, insects, vermin and pests. Necessary extermination work shall be arranged and paid for by the Contractor as part of the contract work within the contract time and shall be performed by a licensed exterminator in accordance with requirements of governing authorities. The Contractor shall be liable for injury to persons or property and responsible for the elimination of offensive odors resulting from extermination operations.
(f) Sanitation - The Contractor shall provide and maintain enclosed toilets for the use of employees engaged in the work. These accommodations shall be maintained in a neat and sanitary condition. They shall also comply with all applicable laws, ordinances and regulations pertaining to the public health and sanitation of dwellings and camps. (g) Wastewater - Wastewater systems shall not be interrupted. Should the Contractor disrupt existing sewer facilities, the Contractor shall immediately notify the Engineer, and the Contractor shall establish a plan, subject to the approval of the City, to convey the sewage in closed conduits and disposed of it back into the sanitary sewer system.

Sewage shall not be permitted to flow in trenches or be covered by backfill. (h) Temporary Light, Power and Water - The Contractor shall at his own expense furnish, install, maintain, and remove all temporary light, power, and water, including piping, wiring, lamps, and other equipment, necessary for the work. The Contractor shall not

9.f
January 26, 2026 Packet Pg. 198
GP-46
draw water from any water source, except to extinguish a fire, without first obtaining permission from the appropriate water utility company/agency. (i) Storm Water Pollution Control – All work shall conform to the National Pollutant Discharge Elimination System (NPDES) General Permit for Storm Water Discharges Associated with Construction and Land Disturbance Activities (Order No. 2009-0009- DWQ, NPDES No. CAS000002) ("General Permit"), and the NPDES Municipal Regional Stormwater Permit (MRP) (Order No. R2-2015-0049, NPDES No. CAS612008). The Contractor shall implement all applicable San Mateo Countywide Water Pollution Prevention Program (SMCWPPP) measures and Best Management Practices (BMPs).

Failure to comply with the approved construction BMPs will result in the issuance of correction notices, citations and/or a stop work order.

The Contractor shall submit to the City a Stormwater Pollution Prevention Plan (SWPPP) or Water Pollution Control Plan (WPCP), prepared in compliance with all NPDES requirements. The SWPPP/WPCP prepared by the Contractor shall address how the Contractor will prevent materials from being rinsed or washed into the storm drain system and specify which BMPs will be implemented for preventing sediment and pollutant discharges into the storm water system. The Contractor shall provide for the construction of facilities which may be required to prevent, control, and abate water pollution.

All construction efforts shall be conducted in a manner which prevents the release of hazardous material or hazardous waste into the soil or groundwater, and minimizes the discharge of pollutants into the storm drain system. No pollutants will be allowed to enter the storm drainage system. The Contractor shall be responsible for containing and removing any waste from the Contractor’s construction operations using the appropriate BMP. The Contractor shall be responsible for cleaning catch basins of solid or liquid waste materials originating from the Contractor’s operation before this material migrates further into the storm drain system. Violation of this provision shall cause the City to issue a stop-work notice and take necessary action to require the Contractor to correct and comply with regulations. All costs related to the stop-work action and corrective work to come into compliance shall be fully borne by the Contractor.

Existing Drainage Conditions - If the work performed interferes with established drainage patterns, ample provisions shall be made by the Contractor to correct the interference.

The City may also direct the Contractor to take additional measures to be performed at the Contractor 's expense.

Illicit Discharge - No dumping or discharge of construction materials, debris, and hazardous materials will be permitted into the City's storm drainage system. In the event of any discharge, leakage, spill or emission of hazardous materials, Contractor shall promptly notify the City and shall clean all affected property. The Contractor shall indemnify, hold harmless and defend the City against all liability incurred as a result of any such discharge, leakage, spill or emission, regardless of whether such liability, cost or expense arises during or after the term of the permit.

9.13 Preservation of Property - The Contractor shall be responsible for the protection of public and private property adjacent to the work.

Due care shall be exercised to avoid damage to existing roadway improvements and facilities, adjacent property, roadside trees, lawn and shrubbery not designated for removal, pole lines, fences, signs, survey markers and monuments, buildings and structures, conduits, pipe lines under or above ground, sewer and water laterals, and any other improvements or facilities within or outside the limits of construction. As ordered and approved by the Engineer, the Contractor shall provide and install suitable safeguards to protect such objects from injury or damage. If such objects are injured or damaged by reason of the Contractor’s operations, they shall be replaced or restored, at the Contractor’s expense, to a condition as good as when the Contractor entered upon the work, or as good as required by the Contract Documents.

9.f
January 26, 2026 Packet Pg. 199
GP-47
Existing striping damaged during construction within and adjacent to the project site shall be replaced with thermoplastic. Partially damaged striping (such as what might occur trenching through a pavement legend), shall be replaced in their entirety.

Contractor shall preserve carefully bench marks, reference points, and stakes; in case of willful or careless destruction, he will be charged with the resulting expense of replacement and shall be responsible for any mistakes that may be caused by their unnecessary loss or disturbance.

Any survey monuments that are damaged or removed as part of the construction shall be replaced by the Contractor and a Record of Survey, as required by State law, shall be filed by a licensed Land Surveyor at the Contractor's expense.

The fact that any such improvement or facility is not shown upon the plans shall not relieve the Contractor of his responsibility under this Section. It shall be the Contractor’s responsibility to ascertain the existence of any underground improvements or facilities indicated on the plans, indicated by locating services, or as evidenced by facilities visible in the field.

Contractor shall protect his work, supplies and materials from damage due to the nature of the work, the action of the elements, trespassers, or any cause whatsoever which is under his control, until the completion and acceptance of the work. Neither the City nor any of the City's agents assume any responsibility for collecting indemnity from any person(s) causing damage to the work of the contractor.

9.14 Protection of Buried Utilities – When the Contractor's attention is directed to the existence of pipes, cables, culverts, and other underground structures and improvements which may or may not be shown on the plans, it is the responsibility of the contractor to ascertain the exact location of such underground utilities in advance of any digging operations so that they shall not be disturbed or damaged by him during the progress of the work. All expenses of whatever nature arising from such disturbance or replacement or repair thereof shall be borne by the contractor.

If the location of pipelines being installed by the contractor under this contract conflicts with the location of existing pipelines, contractor shall so notify the Engineer in writing. The Engineer will ascertain the location of the existing utility in question and may at his discretion relocate the pipeline being installed for the convenience of the contractor. It shall not be construed that the City or the Engineer is in any way required or obligated to locate or relocate pipelines to locations other than shown on the contract plans. If the Engineer relocates pipelines at the request of the contractor, the contractor shall bear all the expenses incurred in connection therewith.

9.15 Protection of Bridges - Contractor shall be responsible for any damage he may cause to bridges, culverts and road structures. He shall determine in advance the allowable safe load for each structure and, if necessary, provide special shoring and support at his expense.

9.16 Protection of Traffic Signal Facilities - The Contractor shall give at least seventy-two (72) hours advance notice to the Engineer before commencing any street work (such as pavement grinding or trenching) that may potentially damage any traffic signal detection loop wires or any other signal facility.

This requirement is in addition to any Underground Services Alert notifications. The City will then mark the underground traffic signal facilities.

The Contractor shall not proceed with any grinding, trenching or other underground work until it has been verified with the Inspector that signal facilities have been marked.

In the event that the Contractor's construction activities cause any failure of a traffic facility, it shall be repaired and be made fully operable within 24-hours of the damage occurring. In the event that such repair is not undertaken within this time limit, the City may repair the facility at the Contractor’s expense.

9.f
January 26, 2026 Packet Pg. 200
GP-48

9.17 Restoration of Adjacent and Existing Improvements - Contractor shall do all cutting, fitting, or patching of the work required to make all parts of the work come together properly with existing and adjacent conditions.

Unless otherwise provided, the Contractor shall repair or replace all existing improvements (e.g., curbs, sidewalks, driveways, fences, signs, utilities, street surfaces, structures, etc.) damaged or removed as a result of his operations. Repairs and replacements shall be at least equal to existing improvements, and shall match in terms of condition, finish and dimension to the satisfaction of the Engineer.

All Underground Services Alert (USA) markings, including the initial markings made by the Contractor and those markings placed by others in responseshall be removed at the Contractor’s expense when they are no longer required. Acceptable means of removal include sand blasting, high pressure washing, or other means approved by the Engineer.

All traffic signs and street signs within the limit of work necessarily removed during the various phases of operations shall be temporarily reset by the Contractor at or near the original location upon completion of each phase of construction operations. Prior to removal of all traffic control signs, the Contractor shall submit photographs of the site which show the existing location of these signs so that upon completion the photographs will aid in resetting the signs at or near their original location. Traffic control signs and street signs will be replaced upon completion of the work and the cost of removal and replacement shall be considered as part of the contract bid items, and no separate payment will be made thereof.

Rural type mail boxes shall be maintained by the Contractor in a manner satisfactory to the property owner and postal service, and the Contractor shall relocate the same as soon as possible to a permanent location in accordance with postal regulations and in a location acceptable to the property owner.

Any object to be removed and reused at other locations shall be removed with due care and delivered or stored at the project’s construction storage area, or if approved by the Engineer, at any other site designated by the Engineer within the City. Such objects may consist of street light poles, signal mast arms and other objects directed by the Engineer. Items not approved by the Engineer for reuse purposes, and without salvage value, shall become the property of the Contractor, to be disposed of at Contractor expense, in an acceptable manner.

9.18 Archeological Remains - If human and/or archeological remains are uncovered during excavation. All earthwork within one-hundred (100) feet of these materials will be stopped until a Coroner and/or professional archeologist (SCA) and/or the Society of Professional Archeology (SOPA) has had an opportunity to evaluate the significance of the find and suggest appropriate mitigation measures.

9.19 Access to Private Property - The Contractor shall schedule and perform operations so as to minimize disruption of access to private property. Prior to blocking access to any private driveway or parking lot entrance, the Contractor shall notify the residents, business owners or tenants of pending closure and allow residents to remove vehicles. During non-working hours no driveway, house or parking lot shall be denied access to a public roadway.

The Contractor shall coordinate with the adjacent property owners and businesses and maintain vehicle and pedestrian access to their properties at all times. Temporary access ramps, fencing, or other measures shall be provided as needed.

9.20 Traffic Control and Public Convenience – The Contractor shall provide for safe movement of all vehicular, bicycle and pedestrian traffic through and around the construction operations with as little inconvenience and delay as possible. The Contractor shall have no amount of work under construction other than what he can properly prosecute with due regard to the rights and convenience of the public.

Proper conveyance of vehicular traffic and pedestrians through the work area depends upon navigating under unexpected situations. The means of clarifying such conditions to the public include the Contractor’s use of signs, flagmen, pavement markings, barricades, lights, cones and delineators. No

9.f
January 26, 2026 Packet Pg. 201
GP-49
one standard sequence of signs or control devices will suit all conditions which may result from construction operations. Even for the same work, the conditions may vary from hour to hour, requiring adjustment and revisions of the traffic control in effect. The traffic control requirements specified herein are therefore intended to establish general principles to be observed in the control and regulation of traffic through and around the construction operations anticipated for this project. The requirements set forth in this Section represent the minimum traffic control requirements imposed and the Contractor shall be solely responsible for providing the full extent of traffic control measures that are necessary. Only individuals trained in the principles of implementing traffic control and/or traffic control flagging shall be assigned that responsibility at the work site.
(a) Traffic Control Plan – The Contractor shall submit a Traffic Control Plan to clearly describe proposed traffic control measures. The plan shall be generally in accordance with the illustrations included in the “California Manual of Uniform Traffic Control Devices” and the “Work Area Traffic Control Handbook”, (Building News Incorporated P.O. Box 3031, Terminal Annex, Los Angeles, CA 90051). The submittal shall consist of scaled drawings for each situation anticipated to be encountered, i.e., intersections, mid-block (each during working and non-working hours), etc. The drawings shall show signs, traffic control devices and flagmen as required.

The Traffic Control Plan shall be directed equally to the regulation and protection of nonvehicular traffic including pedestrians, bicyclists, joggers, skaters, skateboarders, etc.

The Contractor shall provide for the protection and separation of non-vehicular traffic from construction operations at all times. No work involving the implementation of traffic control shall begin until the Engineer has reviewed and has no exception to the traffic control plans. The Contractor may implement a revised Traffic Control Plan only with subsequent review with no exceptions by the Engineer.
(b) Traffic Control Devices - Traffic control devices shall be provided in sufficient quantities and types as required to provide safe and adequate traffic control. During hours of darkness, approved lights and/or flares shall be included, in proper working order, to illuminate signs and hazards and alert approaching traffic. Barricades shall be furnished and maintained along all open trenches in contact with traffic. No work may begin on any day or at any time before traffic control devices have been placed, test driven and, if required, adjusted and revised. All traffic control devices shall be placed in accordance with the Manual of Uniform Traffic Control Devices and the Contractor’s favorably reviewed traffic control plans. Locations of devices shall be adjusted to suit the conditions and circumstances of each detour situation. In all cases, signs shall be placed to most effectively convey their messages to approaching traffic.

The Contractor shall maintain all traffic control devices, at proper locations and in proper working order, at all times during construction operations and whenever a hazard resulting from Contractor’s operations exists. The Contractor shall adjust and revise traffic control devices, placement, etc., to suit changing conditions around construction operations. Traffic control devices shall remain in place at all times, as required to alert approaching traffic of upcoming hazards. After hazards have been removed, all traffic control devices shall be removed. Temporary signs shall be removed or their messages covered.

Daily traffic control measures shall continue until cleanup activities have been satisfactorily completed and all of the Contractor’s equipment has been removed from the traveled way.
(c) Traffic Control Detours - The Contractor shall direct, divert and detour traffic through, around and adjacent to construction operations in accordance with the traffic control plans specified in the Contract Documents or in accordance with the Contractor’s favorably reviewed traffic control plans.

1. Field Review of Detours - Immediately after traffic control devices have been placed, the detour shall be test driven by the Engineer or Inspector and the Contractor’s Superintendent. The test drive shall include approaches to the detour from each possible direction, and traverse the full length of each detour route. The Contractor shall adjust and revise all traffic control devices as

9.f
January 26, 2026 Packet Pg. 202
GP-50
determined to be required by the test drive and the test drive shall be repeated, if determined necessary by the Engineer or Inspector. The Contractor shall provide additional traffic control devices as required to maintain the flow of traffic throughout construction operation.

2. Diverting Bicycle and Pedestrian Traffic – Whenever construction operations obstruct the flow of bicycle and pedestrian traffic or present a hazard to bicycles and pedestrians, the Contractor shall take appropriate action to protect and separate bicycles and pedestrians from the work area. Such action may include placement of barricades between bicycles and pedestrians and the work areas, placement of warning signs, and provisions utilizing personnel as required to protect and maintain access for bicycles and pedestrians as conditions warrant.

3. Diverting Vehicular Traffic - Whenever construction operations obstruct the flow of vehicular traffic or present a hazard to vehicles operating in the vicinity of construction operations, the Contractor shall take appropriate action to warn, detour and otherwise protect approaching drivers and vehicles.

4. Flagmen - The Contractor shall employ flagmen as required for each specific detour and at all locations where barricades and warning signs cannot control the movement of traffic. A warning sign shall be placed ahead of the flagman reading: “Flagman Ahead.” The distance between the sign and the flagman should be based on the average traffic speed, allowing approximately fifty (50) feet for each ten (10) miles per hour. During hours of darkness, flagman stations shall be illuminated such that the flagman will be clearly visible to approaching traffic. Lights for illuminating the flagman station shall receive favorable review by the Engineer. The flagman shall wear a red or orange warning garment when flagging. Flagmen shall be provided with approved red flags or STOP/SLOW hand paddles, and two-way radios for communication. When flagging during hours of darkness, the flagman shall signal with a red light or flare and shall have a belt and suspender harness outside his garment fitted with reflectors or made from reflectorized cloth, unless the garment is well reflectorized in one of these ways.

5. Notice to Agencies - The Contractor shall notify the Engineer and all agencies having jurisdiction over the work, in writing, at least ninety-six (96) hours, excluding holidays and weekends, prior to instituting any lane closure or detour.

At the end of each workday, the Contractor shall inform the Engineer, Police Department and Fire Departments of the status of all detours, lane restrictions, or road closures. The Contractor shall cooperate and coordinate with the various parties involved in the collection and removal of trash and garbage, the transit providers, the U.S. Postal Service, and others, as necessary, in order to maintain existing schedules and services.

6. Emergency Vehicle Access Through Detours - During all detours and/or street closures the Contractor shall provide for the movement of emergency vehicles through the work area. It is essential that the Contractor’s work and equipment does not impede emergency access.

7. Night Detours - The Contractor shall not be permitted to maintain any lane closure or road closure during non-working hours without first obtaining written approval from the Engineer. During non-working hours the Contractor shall restore travel lanes to their original alignment and configuration by means of placing temporary asphalt pavement or bridging with steel plates. The Contractor shall place “ROUGH ROAD” signs conforming to the Manual of Uniform Traffic Control Devices at uneven temporary pavement or bridging locations. See General Provisions, Section 9.18 (b), “Trench Safety Requirements”.

8. Temporary Traffic Lanes – Temporary traffic lanes shall be at least ten (10) feet wide, or eleven (11) feet wide around curves. Provide an additional two (2) feet

9.f
January 26, 2026 Packet Pg. 203
GP-51
of clearance from curbs. The length of temporary lanes should be limited to the area under construction and the distance necessary to divert traffic. (d) Parking Restrictions - The Contractor shall post approved “No Parking” signs at all locations necessary to establish work areas and detour traffic. Signs shall read: “NO PARKING - CONSTRUCTION TOW-AWAY ZONE,” show the actual day and hours of parking restriction and indicate the telephone number of the City’s Police Department or agency having jurisdiction. Signs shall be placed at least forty-eight (48) hours in advance of the restriction. The Engineer shall approve the location and duration of no parking limits and verify their placement. “No Parking” signs shall be removed when no work is under construction and must be reposted forty-eight (48) hours before the resumption of construction activities.

For any violation of “No Parking” signs by motorists, the Contractor shall contact and coordinate directly with the City’s Police Department for removal of vehicles in accordance with the California Vehicle Code. The Contractor shall also coordinate with the Police Department directly for enforcement and towing of parked vehicles.

9.21 Safety - The Contractor shall be solely responsible for initiating, maintaining, and supervising all safety precautions and programs in connection with the performance of the work. The Contractor’s responsibilities shall specifically provide for the safety of persons involved in the project, other persons who are affected by the performance of the work, the work in place, materials and equipment to be incorporated in the work, the project site, and adjoining property.

The services of the City in conducting inspection or construction review of the Contractor's performance is not intended to include review of the adequacy of the Contractor's work methods, equipment, bracing, shoring or scaffolding, or safety measures, in, on, or near the construction site.

Safety vests and personal protection equipment shall be worn by the Contractor, all subcontractors and other personnel when working or present on the site. Hard hats shall be worn when working around earthmoving or any heavy construction equipment or during any overhead construction work.

Payment for performing all work necessary to provide safety measures shall be included in the bid items for which safety measures are required and no additional compensation will be made. (a) Safety Orders – The Contractor shall have at the work site, copies or suitable extracts of:

Construction Safety Orders, Tunnel Safety Orders, and General Industry Safety Orders issued by the State Division of Industrial Safety. The Contractor shall comply with provisions of these and all other applicable laws, ordinances, and regulations. (b) Trench Safety Requirement - As required by California Labor Code, Section 6705 and in addition thereto, for any excavation of any trench or trenches five (5’) feet or more in depth, the Contractor shall submit to the Engineer for review, a detailed plan showing the design of shoring, bracing, sloping, or other provisions to be made for worker protection from the hazard of caving ground during the excavation of such trench or trenches.

Structural calculations prepared, stamped and signed by a Registered Engineer licensed to practice in the State of California shall accompany the plan to verify the structural safety and adequacy of the sheeting, shoring and bracing to be used on the project. No such plan shall allow any shoring, sloping or a protection system less effective than that required by the Construction Safety Orders of the State Division of Occupational Safety and Health.

The maximum length of open trench shall be three-hundred (300) feet or the distance that pipe can be installed in a single day as determined by the Engineer. Trenches shall be backfilled and covered with two (2) inches of cutback (in paved areas) or bridged with tack-welded steel plates at the end of each workday. Cutback shall be placed around plate edges to provide a smooth transition and to secure against displacement.

9.f
January 26, 2026 Packet Pg. 204
GP-52
As soon as possible under the provisions of these specifications, the Contractor shall backfill all excavations and restore to usefulness all improvements that existed prior to the start of construction.
(c) Confined Space Entry Program (CSEP) - Entry into permit-required confined spaces as defined in Section 5157, Title 8, California Code of Regulations (CCR) may be required as a part of the work. All manholes, tanks, vaults, pipelines, excavations, or other enclosed or partially enclosed spaces shall be considered permit-required confined spaces until the pre-entry procedures demonstrate otherwise. The Contractor shall be responsible for implementing, administering, and maintaining a confined space entry program (CSEP) in accordance with Sections 5156, 5157, 5158, Title 8, CCR and shall implement such a program prior to performing any work in a permit-required confined space. A copy of the permit shall be available at all times for review by the Contractor and City personnel at the work site.

Prior to starting work, the Contractor shall prepare and submit its comprehensive CSEP to the Engineer. The CSEP shall address all potential physical and environmental hazards and contain procedures for safe entry into confined spaces, including, but not limited to the following:

1. Training of personnel

2. Purging and cleaning the space of materials and residue

3. Potential isolation and control of energy and material inflow

4. Controlled access to the space

5. Atmospheric testing of the space

6. Ventilation of the space

7. Special hazards consideration

8. Personal protective equipment

9. Rescue plan provisions
The Contractor’s CSEP submittal shall also include the names of the Contractor’s and Subcontractor’s personnel assigned to the project who will have CSEP responsibilities, their CSEP training, their specific assignment and their responsibilities in carrying out the CSEP.

Payment for implementing, administering, and providing all equipment and personnel associated with the CSEP shall be included in the bid items for which the CSEP is required and no additional compensation will be made.
(d) Hazardous Conditions: Contractor’s Responsibility for Precautions - Contractor agrees that if, during the progress of the work, a hazardous condition is identified which involves a risk of bodily harm to any person or a risk of damage to any property, the Contractor will take such special precautions as shall be necessary to make the progress of the work safe under such condition. Conditions may result from, but are not limited to, the use of specified materials or equipment, the location of the work, the condition of the site, the kind or method of construction, or the manner in which any of the work is required to be done. The Contractor agrees to assume the sole responsibility for determining whether any such hazardous condition exists or will be created during the course of the work. (e) Use of Explosives – Explosives may be used only when authorized in writing by the Engineer, or as otherwise stated in the Specifications. Explosives shall be handled, used, and stored in accordance with all applicable regulations. No explosive material shall be transported to, stored or utilized on the site without written permission of Engineer. All blasting work and handling of explosives on the site shall be done only by qualified persons who possess a valid permit. The Engineer’s approval of the use of explosives shall not relieve the Contractor from liability for claims caused by blasting operations.

9.f
January 26, 2026 Packet Pg. 205
GP-53
(f) Special Hazardous Substances and Process – Materials that contain hazardous substances or mixtures may be required on the work. A Material Safety Data Sheet as described in California Code of Regulations, Section 5194 shall be requested by the Contractor from the manufacturer of any hazardous products used and submitted to the Engineer.

Hazardous material usage shall be accomplished with strict adherence to California Division of Industrial Safety requirements and all manufacturer warnings and application instructions listed on the Material Safety Data Sheet and on the product container label.

The Contractor shall notify the Engineer if a specified product cannot be used under safe conditions.

9.22 Patent Fees or Royalties - All fees, royalties or claims for any patented invention, article or method that may be used upon or in any manner connected with the work under this contract shall be included in the price bid for the work and the contractor and his sureties shall protect and hold the City, together with all the City's officers, agents, servants and employees, harmless against any and all demands made for such fees or claims brought or made by the holder of any invention or patent and, before the final payment is made on account of this contract, contractor shall, if requested by the Engineer, furnish acceptable proof of a proper release from all such fees or claims.

Should the contractor, his agents, servants or employees, or any of them, be enjoined from furnishing or using any invention, article, material or appliance supplied or required to be supplied or used under this contract, the contractor shall promptly substitute other articles, materials or appliances, in lieu thereof, of equal efficiency, quality, finish, suitability and market value and satisfactory in all respects to the Engineer. Or, in the event that the Engineers elects in lieu of such substitution to have supplies and to retain and use any such invention, article, material or appliance as may be required by the contract to be supplied – in that event, the contractor shall pay such royalties and secure such valid licenses as may be requisite and necessary for the City, the City's officers, agents, servants and employees, or any of them to use such invention, article, material or appliance without being disturbed or in any way interfered with by any proceeding in law or equity on account thereof. Should the contractor neglect or refuse to make the substitution promptly, or to pay such royalties and secure such licenses as may be necessary, then, in that event, the Engineer shall have the right to make such substitution or the City may pay such royalties and secure such licenses and charge the cost thereof against any monies due the contractor from the City or recover the amount thereof from him and his sureties notwithstanding final payment under this contract may have been made.

9.23 Advertising - The names of the Contractor or Subcontractors, with their addresses and the designation of their particular specialties, may be displayed at the job site on removable signs only if written approval is received from the Engineer. Commercial advertising material shall not be attached to, or painted on the surfaces of, any buildings, fences, canopies, or barricades.

9.24 Antitrust Claims – Attention is directed to Public Contract Code, Section 7103.5 which provides: “In entering into a public works contract or a subcontract to supply goods, services, or materials pursuant to a public works contract, the Contractor or Subcontractor offers and agrees to assign to the City all rights, title, and interest in and to all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C. Sec 15) or the Cartwright Act (Chapter 2, commencing with Section 16700, of Part 2 of Division 7 of the Business and Professions Code), arising from purchases of goods, services, or materials pursuant to the public works contract or subcontract. The assignment shall be made and become effective at the time the City tenders final payment to the Contractor, without further acknowledgement by the parties.”

9.25 Audit and Examination of Records – The City and entities and agencies designated by the City, shall have access to, and the right to audit and examine at no additional cost, all of the Contractor’s project related data including but not limited to, books, estimates, records, contracts, bid cost data, Subcontractor and supplier job cost data, change orders, correspondence, instructions, drawings, receipts, vouchers, purchase orders, notes, computations, daily logs, and memoranda relating to the work. Pursuant to Government Code, Section 8546.7, the Contractor shall preserve all such records and will be subject to examination and audit by the State Auditor, at the request of the City, for a period of three (3) years after final payment under the Agreement.

9.f
January 26, 2026 Packet Pg. 206
GP-54

9.26 Notice of Entrance - Before entering any private property the contractor shall give the owner, tenant and inspector a minimum of forty-eight (48) hours written notice.

9.27 Additional and Emergency Protection - Wherever, in the opinion of the Engineer, the contractor has not taken sufficient precautions for the safety of the public or the protection of the works to be constructed under this contract, or of adjacent structures or property which may be injured by processes of construction on account of such neglect, and whenever, in the opinion of the Engineer, an emergency shall arise and immediate actions shall be considered necessary in order to protect personal and property interest, whether public or private, then and in that event, the Engineer, with or without notice to the contractor, may provide suitable protection to the said interests by causing such work to be done and such material to be furnished as shall provide such protection as the Engineer may consider necessary and adequate.

The cost and expense of such work and material so furnished shall be borne by the contractor and if the same shall not be paid on presentation of the bills therefore, then such costs shall be deducted from any amounts due or to become due the contractor. The performance of such emergency work under the direction of the Engineer shall in no way relieve the contractor from any damages which may occur during or after precaution has been taken by the Engineer.

9.28 Placing Portions of Work in Service - Portions of the work may be placed in service as completed if desired by the City. Contractor shall give proper access to the work for this purpose. Such use and operation shall not constitute an acceptance of the work and the work, and the contractor shall be liable for defects due to faulty construction until the entire work under the contract is finally accepted.

9.29 Rights-of-Way - The City will provide all rights-of-way and easements in or beneath which pipes and other structures will be constructed by the Contractor under this contract. If through the failure of the City to acquire or clear title to rights-of-way, the Contractor sustains loss which could not have been avoided by the judicious handling of forces and plant, there shall be paid to the contractor such amount as the Engineer may find to be a fair and reasonable compensation for such part of the Contractor's actual loss as the Engineer deems unavoidable. Actual loss shall be understood to include no items other than necessary payments, idle time of men, idle time of equipment, cost of extra moving of equipment, and cost of longer hauls, with no allowance in any case for overhead or profit. If performance of the Contractor's work is delayed as a result of the failure of the City to acquire or clear title to rights-ofway, a commensurate extension of time will be granted.

9.f
January 26, 2026 Packet Pg. 207
GP-55
SECTION 10 - MEASUREMENT AND PAYMENT

10.01 Measurement of Quantities for Unit Price Work - Materials and items of work which are to be paid for on the basis of measurement shall be measured in accordance with the methods stipulated in the particular sections of the Contract Documents involved. Unless specifically stated otherwise in this contract, no extra measurement(s) according to local custom of any kind shall be allowed in measuring the work under this contract; only the length, area, solid contents, number, weight, or time in standard units, as the case may be, shall be considered as specified.

Unless otherwise specified, quantities of work shall be determined from measurements or dimensions in the horizontal planes. Stationing shall be along the street centerline, lengths of sanitary sewers, storm drains and water lines shall be measured as the horizontal distances from center to center of structures, rounded to the nearest foot, and lengths of all return radii and curb data shall be measured along the face of curb. Volumetric quantities shall be the product of the mean area of vertical or horizontal sections and the intervening horizontal or vertical dimensions. Measurements shall be in accordance with U.S. Standard Measures. A pound is an avoirdupois pound. A ton is two-thousand (2,000) pounds avoirdupois. The unit of liquid measure is the U.S. gallon.

When payment is to be made on the basis of weight, the weighing shall be done on certified platform scales or, when approved by the Engineer, on a completely automated weighing and recording system. The Contractor shall submit to the Engineer with duplicate licensed Weighmaster’s certificates showing the actual net weights. The City will accept the certificates as evidence of the weights delivered.

10.02 Bid Items - Should any bid item be eliminated in its entirety, payment will be made to the Contractor for actual costs incurred, in connection with such eliminated contract work, and for costs incurred prior to the date of the Engineer’s written notification eliminating such work. The actual costs to be paid to the Contractor shall be computed in the same manner as if the work were to be paid on a force account basis. No compensation will be made to the Contractor, in any case, for loss of anticipated profits. Increased or decreased scope involving a change order will be paid as stipulated in the change order.

The estimated value of work performed, for lump sum bids or lump sum bid items will be determined from the schedule of values, to be prepared by the Contractor and presented at the preconstruction meeting. Elements of work on the schedule of values shall be separated into groupings appropriate for the project. The Technical Specifications may be used as a guide for establishing these groupings. Move-in costs, bond and insurance costs, and submittal preparation costs can be included in the schedule of values under a separate mobilization line item. This line item shall not exceed fivepercent (5%) of the contract’s value. Overhead and profit shall not be allowed as a line item, but shall be prorated over other items of work.

10.03 Bid Quantities - The quantities listed in the Bid Schedule for each bid item do not govern final payment. Payments to the Contractor will be made only for the actual quantities of contract items constructed in accordance with the plans and specifications. If upon completion of the construction, the actual quantities show either an increase or decrease from the quantities given in the bid schedule, the contract unit prices will still prevail.

Payment will not be made for materials wasted or disposed of in a manner not called for under the contract. This includes rejected material not unloaded from vehicles, material rejected after it has been placed and material placed outside of the plan lines. Unless otherwise provided, no payment will be made for materials delivered to the site but not incorporated in the work. Such quantities will not be included in the final pay quantities. No compensation will be allowed for the disposal of rejected or excess material.

When the estimated quantity for a specific portion of work is designated on the Bid Schedule as a “Final Pay Quantity”, the estimated quantity specified shall be the final quantity for which payment for such specified portion of the work will be made, regardless of the actual quantity constructed, unless the

9.f
January 26, 2026 Packet Pg. 208
GP-56
dimensions of said portions of the work shown on the plans are revised by the Engineer. If such dimensions are revised and such revisions result in an increase or decrease in the quantity of such work, the final quantity for payment will be revised by the amount represented by the change. The estimated quantity for any portion of the work designated as a Final Pay Quantity shall be considered as approximate only and no guarantee is made that the quantity, which can be determined by computations, based upon the details and dimensions shown on the plans, will equal the estimated quantity. No allowance will be made in the event that the quantities based upon computations do not equal the estimated quantities. Final pay quantities will be designated on the Bid Schedule with the letter (F) and shall only apply to the corresponding portions of work specifically designated on the plans. Any portion of work not designated as a final pay quantity will be measured and paid for as specified under other provisions of the Contract Documents.

10.04 Progress Payments – On or about the 25th day of each month may be designated as the date which would terminate each working month for the purpose of making progress payments.

The Contractor's request for a progress payment shall be submitted under cover of the Request for Progress Payment form approved by the Engineer. The Request for Progress Payment form shall be complete and properly executed by the contractor, and have, as attachments, the items listed on the form.

The Contractor shall, on the date established, prepare and submit a progress estimate to the City for work accomplished during the previous working month, based on the various contract bid items and the unit bid prices. Invoices shall include amounts previously paid, itemized retention and any deductions or additions authorized by change order. Consultation with the Engineer may be necessary to determine the amount of work accomplished.

The first progress payment will not be made until the following submittals have been provided and accepted: list and schedule of submittals, Baseline Construction Schedule, schedule of values (if applicable), SWPPP. Subsequent progress payment requests will not be accepted unless accompanied by the progress payment cover letter, an updated baseline or revised schedule, a certification that the record drawings have been updated as of the date of the invoice.

Upon receipt of a progress payment request, the City shall, within ten (10) working days, determine if the request is proper, and if disputed the City will return the progress payment to the Contractor along with a written document setting forth the progress payment request’s shortcomings.

Following receipt of an undisputed and properly submitted progress payment request, the City shall authorize payment within thirty (30) calendar days.

Contractor may request partial payment for materials delivered to the site but not yet incorporated into the work (materials on hand). To receive consideration for payment of materials on hand, the Contractor shall provide the Engineer with a list of such materials at least five (5) working days prior to submitting the monthly estimate of amount earned for work completed. At the Engineer’s sole discretion, up to seventy-five-percent (75%) of the estimated value of materials on hand may be considered for payment, subject to the following:
(a) Only materials which have received favorable review of shop drawings will qualify. (b) Eligible materials must be delivered and properly stored, protected, and maintained in a manner favorably reviewed by the Engineer, at the job site or at a bonded warehouse. (c) The Contractor's actual net cost for the materials must be supported by paid invoices to suppliers or other documentation requested by the Engineer. (d) Materials delivered to the site less than thirty (30) days prior to their scheduled incorporation in the work shall not qualify.
(e) Partial payments for materials on hand shall not be deemed to be final payment for the material nor relieve the Contractor of his obligations under the Contract. (f) Partial payments for materials on hand shall be subject to retention.

9.f
January 26, 2026 Packet Pg. 209
GP-57
From each progress estimate, five percent (5%) will be deducted and retained by the City, and the remainder of the amount due, less the amount of all previous payment will be paid to the Contractor provided all work invoiced has been completed and approved by the Engineer.

The Engineer may withhold or nullify, the whole or any part of any payment to such extent as may be necessary to protect the City from loss on account of any of the following:
(a) Defective or vandalized work not remedied,
(b) Damage to the City or another Contractor,
(c) Claims filed, or reasonable evidence indicating probable filing of claims, (d) Stop notices, or failure of the Contractor to make payments properly to subcontractors or laborers or suppliers, in which case 125% of the stop notice amount shall be withheld until a release form is received,
(e) A reasonable doubt that the contract can be completed for the balance unpaid, (f) Reasonable evidence that the work will not be completed within the contract time and that the unpaid balance of the contract sum would not be adequate to cover the City’s liquidated damages assessed in accordance with the Agreement for the anticipated delay,
(g) Failure of Contractor to maintain, update and submit record documents, schedules or other submittals as required by the Contract Documents, (h) Performance of work by Contractor without properly processed shop drawings; (i) Any other failure of Contractor to perform its obligations under the Contract Documents.

The Contractor may elect to receive one hundred percent (100%) of payments due under the contract from time to time, without retention of any portion of the payment by the City, by depositing and maintaining securities of a value equivalent to the retention amount with the City in accordance with the provisions of Public Contract Code, Section 22300. Such securities, if deposited by the Contractor, shall be valued by the City’s Administrative Services Director, whose decision on valuation of the securities shall be final.

Contractor warrants that, upon submittal of an application for payment, all work for which payment has been previously issued by the City and received by the Contractor, shall be free and clear of all claims, stop notices, security interests, and encumbrances in favor of Contractor, Subcontractors, or other persons or firms entitled to make claims by reason of having provided labor, materials, or equipment relating to work.

The payment of progress payments by the City shall not be construed as an absolute acceptance of the work done up to the time of such payments and shall not constitute acceptance of defective work.

10.05 Retentions - The City shall retain five percent (5%) of the amount of each progress estimate, and the accumulation of said amounts so retained from the progressive payments to the extent unencumbered will be paid to the contractor in no less than thirty-five (35) days after the completion and acceptance by the Engineer and the City of the work done.

Upon contractor's request, City will make payment of funds withheld from progress payments pursuant to the requirements of Code Section 14402 if contractor deposits in escrow with the City, or with a bank acceptable to the City, securities eligible for the investment of State funds under Government Code Section 16430 or bank or savings and loan certificates of deposit, upon the following conditions:
(a) Contractor shall bear the expense of the City and the escrow agent in connection with the escrow deposit made.

9.f
January 26, 2026 Packet Pg. 210
GP-58
(b) Securities or certificates of deposit to be placed in escrow shall be of a value at least equivalent to the amounts of retention to be paid to the contractor pursuant to this section.
(c) Contractor shall enter into an escrow agreement satisfactory to the City, which agreement shall include provisions governing inter alia:

1. Amount of securities to be deposited.

1. Providing of powers of attorney or other documents necessary for the transfer of the securities to be deposited.

2. Conversion to cash to provide funds to meet defaults to termination of the contractor's control over the work, stop notices filed pursuant to the law, assessment of liquidated damages or other amounts to be kept or retained under the provisions of the contract.

3. Decrease in value of securities or deposit.

4. Termination of the escrow upon completion of the contract. (d) Contractor shall obtain the written consent of the surety to such agreement.

10.06 Final Payment - The City shall, prior to final acceptance, provide the Contractor with a copy of the final quantities for the various contract bid items and a summary of contract change orders for his review. All prior payments shall be subject to correction in determining the total contract sum. The Contractor shall reply promptly in writing, to indicate either his concurrence or an explanation of possible discrepancies in the total contract sum.

The project will not be submitted to the City Council for acceptance until the Engineer and the Contractor concur with the totals of all quantities, costs, contract change orders and the total contract sum. Following concurrence, a semi-final payment will be made to the Contractor after deducting all previous payments and all amounts to be retained under the provisions of the contract. The retention payment shall be due and payable as a final payment after the expiration of thirty-five (35) days following the date of final acceptance of the work by the City Council.

If within the time fixed by law, a properly executed notice to stop payment is filed with the City, due to Contractor’s failure to pay for labor or materials used in the work, all money due for such labor or materials will be withheld from payment to the Contractor in accordance with applicable laws.

If releases are required, the Contractor shall pay or cause to be paid to Subcontractors the amount stated in the conditional releases within five (5) days after receipt of the semi-final payment, and shall promptly thereafter furnish evidence of such payment to the City.

The securities deposited by the Contractor will be released, providing that the following requirements of the contract have been fulfilled:
(a) Satisfactory completion of all construction work and written acceptance of said work by the City;
(b) The submission by the Contractor to the Engineer of all required stop notice releases, submittals, written guarantees, warranties, operating manuals, and other project related documentation;
(c) The return to the Engineer of all drawings and written specifications loaned to the Contractor during the construction period.
(d) The submission by the Contractor to the Engineer of record documents and a set of redlined drawings showing the revisions to the original set of drawings which reflect the actual construction of the project for preparation of “Record Drawings”.

The Contractor agrees that the payment of the final amount due under the contract shall release the City of San Carlos from any and all claims or liability on account of all work performed under the

9.f
January 26, 2026 Packet Pg. 211
GP-59
contract, except those items previously made in writing and identified by the Contractor as unsettled.

Release of the final payment by the City shall not be construed as an acceptance of any defective work or acceptance of improper materials.

10.07 Acceptance - Contractor shall notify Engineer in writing of the completion of the work, whereupon the Engineer shall promptly satisfy them self by personal inspection as to the actual completion of the work in accordance with the terms of the contract. After receiving a written recommendation from the Engineer for acceptance of the work, City shall accept or reject the work; stating, if the work is rejected, the requisite conditions for acceptance. When the City accepts the work, they shall file a Notice of Completion with the County Recorder in the county where the work is located and shall promptly notify the contractor in writing of the recordation. Contractor warrants and guarantees that title to all work, materials and equipment accepted by the City will pass to the City free and clear of all liens, claims, security interests or encumbrances, and that no work, materials or equipment accepted will have been acquired by the contractor, or by any other person performing the work at the site or furnishing materials or equipment for the project, subject to an agreement under which an interest therein or encumbrances thereon is retained by the seller or otherwise imposed by contractor of such other person.

10.08 Compensation for Extra or Omitted Work – Compensation for extra or omitted work shall be in accordance with Section 5.08, Change Orders.

10.09 Compensation to City for Extension of Time - In case the work called for under this contract is not completed within the time limit stipulated herein, the City shall have the right, as provided hereinabove, to extend the time of completion thereof. If the time limit so be extended, the City shall have the right to charge to the contractor and to deduct from the final payment for the work the actual cost to the City of engineering, inspection, administration, legal and other overhead expenses which are directly chargeable to the extension of time. The cost of final surveys and preparation of the final estimate shall not be included in such charges.

10.10 Claims - The term “Claim” shall mean a written demand or assertion by the Contractor seeking, as a matter of asserted right, adjustment in the terms of the Contract Documents, payment of money, extension of time, or other relief with respect to the Contract Documents, or determination of other disputes or matters in question between the City and Contractor arising out of or related to the Contract Documents or the performance of the work, including claims alleging an error or omission.

A claim must be stated with specificity, including identification of the event giving rise to claim, the date of the event, and the asserted effect on contract sum and contract time. The claim shall include adequate supporting data. Adequate supporting data for a claim for an adjustment of the contract time shall include scheduling data demonstrating the impact of the event on the completion of the work.

Adequate supporting data for a claim for an adjustment of the contract sum shall include a detailed cost breakdown of the items allowed, isolating labor, material, and equipment costs, and providing detailed quantities and unit prices for changed work. If the exact amount of a claim is not ascertainable at the time such claim is made, the supporting data currently available shall be submitted. Supplemental data supporting the exact amount of the claim shall be submitted as soon as available.

Notwithstanding the making of any claim or the existence of any dispute regarding any claim, unless otherwise directed by the Engineer, the Contractor shall not cause any delay, cessation, or termination in the performance of the work, including portions of the work pertaining to a claim.

10.11 Time Limit on Claims - Contractor shall submit any and all claims, together with adequate supporting data to the Engineer as soon as possible but not later than ten (10) working days after occurrence of the event giving rise to the claim, or the date the Contractor first recognized, or reasonably should have recognized, the condition giving rise to the claim, whichever is earlier. Contractor hereby expressly waives all claims not made within this time limit.

Contractor is expressly barred from asserting any claims of which the Contractor was aware, whether or not the exact amount of such claims was ascertainable, that is not submitted to the Engineer prior to the Contractor proceeding with the work.

9.f
January 26, 2026 Packet Pg. 212
GP-60

10.12 City Response to Claims - The Engineer shall promptly review claims. If additional supporting data is deemed necessary, the Engineer shall request such additional data within ten (10) working days after receipt of the claim. The Contractor shall furnish such additional data no later than ten (10) working days after receipt of the City’s request. The Engineer shall render a decision promptly, but in any event, within thirty (30) working days after the receipt of the claim or the receipt of additional supporting data. If the amount of the claim is in excess of $50,000, the aforesaid thirty (30) working day period shall be sixty (60) working days. Failure of the Engineer to render a decision within the aforesaid thirty (30) or sixty (60) working day period shall be deemed a decision denying the claim and the last day of such period shall be the date of such decision. The decision of the Engineer shall be final and binding unless appealed in accordance with the General Provisions, Section 10.15, “Appeal of the Engineer’s Decision”.

10.13 Appeal of Engineer’s Decision - If Contractor disputes the Engineer’s decision of a claim, the Contractor shall, within thirty (30) calendar days of the decision, make a written appeal of the decision to the Engineer. The written appeal shall include all supporting data upon which the Contractor requests the City to modify its decision, including all documentation transmitted between the Contractor and the Engineer on the underlying claim. The Engineer shall make a good faith effort to resolve the claim prior to final completion of the Project. In the event the claim is not resolved prior to final completion, the Contractor’s claim shall be heard by the Director of Public Works prior to recommending final acceptance to the City Council. The Contractor’s administrative remedies under the Contract Documents shall be exhausted after the decision of the Director of Public Works is rendered. In case of disagreement with the decision of the Director of Public Works, the Contractor may pursue the resolution of the dispute by presenting a formal claim to the City.

9.f
January 26, 2026 Packet Pg. 213
GP-61
SECTION 11 - GUARANTEE

11.01 Contractor’s Guarantee - Prior to final acceptance, the Contractor shall warrant and guarantee to the City that all work is in accordance with the Contract Documents and is not defective.

The guarantee shall be accompanied by a warranty bond for ten percent (10%) of the final contract sum, which shall warrant the quality of the work for a period of two (2) years after acceptance.

The guarantee and warranty bond shall be in accordance with the Agreement Forms furnished in the Contract Documents.

11.02 Correction of Defective Work During the Guarantee Period - If within two (2) years after the date of City Council acceptance, or such longer period of time as may be prescribed by laws or regulations or by the terms of any applicable special guarantee required by the Contract Documents, any work is found to be defective, the Contractor shall promptly without cost to the City and in accordance with the City’s written instructions, either correct such defective work or if it has been rejected by the City, remove it from the site and replace it with non-defective work.

If the Contractor does not promptly comply with the terms of such instructions within ten (10) working days after written demand by the City, the City may have the defective work corrected. The City may also correct defective work immediately in cases of emergency where delay would cause serious risk of loss or damage. All direct, indirect and consequential costs of correcting defective work (including but not limited to fees and charges of engineers, architects, attorneys and other professionals) shall be absorbed by the Contractor.

The Contractor shall remove from the Project site portions of the work and materials which are not in accordance with the Contract Documents and which are neither corrected by the Contractor nor accepted by the City. If Contractor fails to pay the costs of such removal within ten (10) working days after written demand, the City may, without prejudice to other remedies, sell such materials at auction or at private sale, or otherwise dispose of such material. The Contractor shall be entitled to the proceeds of such sale, if any, in excess of the costs and damages for which the Contractor is liable to the City, including reasonable attorneys’ fees and expenses and compensation for the City’s services and expenses.

The City shall have the option, at its sole discretion and by notice to the Contractor, to accept defective work as defined in Section 4.18 – “Acceptance of Defective Work. “

9.f
January 26, 2026 Packet Pg. 214
Special Provisions LED Lighting Conversions at Burton & Highlands Parks, C2102 Page SP-1

SPECIAL PROVISIONS

9.f
January 26, 2026 Packet Pg. 215
Special Provisions LED Lighting Conversions at Burton & Highlands Parks, C2102 Page SP-2
This Page Intentionally Left Blank

9.f
January 26, 2026 Packet Pg. 216
Special Provisions LED Lighting Conversions at Burton & Highlands Parks, C2102 Page SP-3

SPECIAL PROVISIONS
These Special Provisions contain project specific requirements pertaining to the work, and as such, shall take precedence over the General Conditions portions of these Specifications. All costs associated with satisfying the requirements in these Special Provisions shall be included in the Contractor’s bid price and no additional compensation shall be made.

1. DESCRIPTION OF WORK
In general, the Contractor shall furnish all labor, materials, equipment and services necessary to complete the project as further described in the “Instructions to Bidders” of these Specifications.

2. LOCATION
Work to be done under this contract is at Highlands Park and Burton Park in San Carlos, California as shown on the project plans.

3. DAYS & HOURS OF OPERATION
The hours of operation shall be limited to the hours between 8:00 a.m. and 4:00 p.m.

Activities outside of those hours shall not generate objectionable noise, dust, or inconvenience to the public. Regular working days are from Monday through Friday and City legal holidays unless exception is granted by the City Engineer.

4. SEQUENCING AND ORDER OF WORK
The following sequencing constraints are required on the project, shall be incorporated into the Contractor’s master schedule and shall be reflected in the order of work.

1. Demolition work, consisting of the removal and disposal of materials shown on the demolition plan sheets, shall be broken into 2 distinct work areas based on park location. Contractor shall propose the individual work area limits, with City to have final approval.

2. Highlands Parks shall be fully accessible outside of working hours.

3. Burton Park shall be fully accessible outside working hours.

4. Construction zones shall be secured during non-working hours.

5. STAGING / CONSTRUCTION AREA
The City shall designate a staging area for this project at Highlands Park. Should a staging area be desired at Burton Park, the Contractor shall be responsible for securing such an area along with any and all permits and permissions that may be necessary from the City and/or private property owners. Proof of concurrence shall be provided to the City upon request. Any fencing or other protective means (if required or employed by the Contractor) shall be at the contractor’s expense.

6. FURNISHED MATERIALS

9.f
January 26, 2026 Packet Pg. 217
Special Provisions LED Lighting Conversions at Burton & Highlands Parks, C2102 Page SP-4
No materials will be provided by the City for installation by the Contractor.

7. WATER
Water for use during construction shall be furnished by the Contractor and all costs incurred including the water use, meter charges, meter/backflow preventer deposit, vehicles and containers needed in transporting water to the job site shall be paid by the Contractor. The Contractor’s attention is directed to Section 9.11 of the General Provisions for additional information.

8. POWER
All power for and in connection with work to be done under this contract shall be furnished and maintained by Contractor. The Contractor’s attention is directed to Section

9.12(h) of the General Provisions for additional information.

Contractor shall provide power to the restrooms and irrigation controller throughout the entirety of construction at Highlands Park.

9. OWNER / CONTRACTOR MEETINGS
A. PRE-CONSTRUCTION CONFERENCE: A Pre-construction Conference will be held at the San Carlos City Hall, 600 Elm Street, San Carlos, CA 94070 within ten (10) working days after the date the Notice to Proceed is issued at the time and date described in the Notice to Proceed.

The conference will address the scope of work and the Contractor's proposed construction schedule, traffic control and detour plan. At the Pre-construction conference the Contractor shall provide the following, in addition to the items specified in Section 8.09 of the General Provisions:
 The proposed construction schedule (for overall project),  Two-week look-ahead construction schedule,
 Draft of the notification letter to residents and merchants,  The proposed traffic control plan,
 Project submittals.

The meeting shall be attended by:
 Contractor's representative, superintendent and major subcontractors,  City's representative project manager and inspector,
 Design consultant team,
 Others as Appropriate.

B. WEEKLY CONSTRUCTION MEETINGS: : A weekly construction will be held at the construction site or at San Carlos City Hall, 600 Elm Street, San Carlos, CA 94070 as determined by the City Project Manager/Inspector. The weekly meetings will be held on a day and time mutually satisfactory to the City and Contractor’s representative and/or superintendent.

10. NOTIFICATION OF RESIDENTS AND MERCHANTS:

9.f
January 26, 2026 Packet Pg. 218
Special Provisions LED Lighting Conversions at Burton & Highlands Parks, C2102 Page SP-5
The Contractor shall perform the following tasks prior to commencement of the construction work:

A. Prepare and submit to the City, a notification letter, prior to time of construction, stating the nature of work and expected duration of construction activity affecting their property. The City will have one week from the submittal date, to review and make suggested changes within one week of submittal. The Contractor shall distribute the City approved letters via U.S. mail to provide a two week and seventy-two (72) hours advance notification to all residents and businesses impacted by the construction.

B. Include Contractor's telephone number for the purpose of taking inquiries and complaints.

C. Submit draft copy to City at Pre-construction conference.

D. Final format and wording of this letter shall be subject to approval of Engineer.

11. STORM WATER POLLUTION PREVENTION
Consistent with the requirements of the federal Clean Water Act, the Project is subject to storm water pollution prevention requirements, which include the implementation of a water pollution prevention plan and/or implementation of local storm water requirements, which prohibit the discharge of pollutants from the Project site.

All work shall conform to the National Pollutant Discharge Elimination System (NPDES) General Permit for Storm Water Discharges Associated with Construction and Land Disturbance Activities (Order No. 2009-0009-DWQ, NPDES No. CAS000002) ("General Permit"), and the NPDES Municipal Regional Stormwater Permit (MRP) (Order No. R2- 2015-0049, NPDES No. CAS612008). The Contractor shall implement all applicable San Mateo Countywide Water Pollution Prevention Program (SMCWPPP) measures and Best Management Practices (BMPs). Failure to comply with the approved construction BMPs will result in the issuance of correction notices, citations and/or a stop work order.

Prior to the start of any field work, the Contractor shall prepare a Water Pollution Control Plan (WPCP), in accordance with the latest version of the California Department of Transportation "Water Pollution Control Program (WPCP) Preparation Manual" and template, or other approved template, for review and approval by the Engineer. The WPCP shall include, at a minimum, the selection of BMPs applicable to the project, and an erosion control plan detailing the locations on the project site where applicable BMPs will be implemented.

The Contractor shall include in the WPCP any applicable California Department of Transportation Construction Site BMP Fact Sheets, or an approved equivalent. The Contractor is responsible for furnishing, installing, constructing, inspecting, maintaining, removing, and disposing of the BMPs as necessary throughout the entirety of the project. The Contractor shall inspect BMPs regularly, and correct improperly installed, damaged, or ineffective BMPs immediately. Site BMP inspections shall be performed in

9.f
January 26, 2026 Packet Pg. 219
Special Provisions LED Lighting Conversions at Burton & Highlands Parks, C2102 Page SP-6
accordance with the approved SWPPP/WPCP, and at a minimum of two week intervals.

Reports of each BMP inspection shall be provided to the City on a monthly basis.

12. CONSTRUCTION AND DEMOLITION DEBRIS
The City has an ordinance requiring that debris from construction and demolition activities be reused, recycled and/or salvaged and diverted from a landfill. The Contractor shall provide sufficient evidence (weight tickets or other documents) to verify that some of debris is being recycled, reused and/or salvaged to the satisfaction of the Engineer.

13. HAUL ROUTES
The Contractor shall submit haul routes to the City for approval prior to commencing construction. Holly Street east of El Camino Real shall be prohibited.

14. TRAFFIC CONTROL
The Contractor shall submit a Traffic Control Plan, prepared by a Traffic Engineer licensed in California, for approval before performing any lane closure or detour.

15. CONSTRUCTION SCHEDULE
The Contractor shall submit a three week look ahead schedule updated weekly.

16. SUBMITTALS
The following items of work will require submittals.

Item Description Specification Section Drawing Sheet
Basic Materials and Methods Section 26 05 12
Light Fixtures E-1.1 & E-1.2
Tenons E-1.1 & E-1.2
Lighting Control Panel E-1.1 & E-1.2
Eaton Power Center E-1.2

17. STREET SWEEPING
The Contractor shall sweep the streets in accordance with the project provisions.

18. GROUND PROTECTION MATS
The Contractor shall utilize ground protection mats when traversing across any field with any vehicle. Any equipment path of travel across sport field surfaces shall be submitted to the City for approval prior to commencing construction.

9.f
January 26, 2026 Packet Pg. 220
2300283 LED Lighting Conversions at Burton & Highlands Parks 1/18/2024 TABLE OF CONTENTS
Page - 1

TABLE OF CONTENTS
DIVISION 26 - ELECTRICAL
26 05 05 SELECTIVE DEMOLITION FOR ELECTRICAL
26 05 10 ELECTRICAL GENERAL PROVISIONS
26 05 12 BASIC MATERIAL AND METHODS
9/23/2025

9.f
January 26, 2026 Packet Pg. 221
2300283 LED Lighting Conversions at Burton & Highlands Parks 1/8/2024 SELECTIVE DEMOLITION FOR ELECTRICAL
26 05 05 - 1
SECTION 26 05 05

SELECTIVE DEMOLITION FOR ELECTRICAL
PART 1 GENERAL

1.01 SECTION INCLUDES
A. Electrical demolition.

1.02 SUBMITTALS
A. See Division 1 for submittal procedures.

PART 2 PRODUCTS

2.01 MATERIALS AND EQUIPMENT
A. Materials and equipment for patching and extending work: As specified in individual sections.

PART 3 EXECUTION

3.01 EXAMINATION
A. Verify field measurements and circuiting arrangements are as indicated.

B. Verify that abandoned wiring and equipment serve only abandoned facilities.

C. Demolition drawings are based on casual field observation and existing record documents.

D. Report discrepancies to Owner before disturbing existing installation.

E. Beginning of demolition means installer accepts existing conditions.

3.02 PREPARATION
A. Disconnect electrical systems in walls, floors, and ceilings to be removed.

B. Coordinate utility service outages with utility company.

C. Provide temporary wiring and connections to maintain existing systems in service during construction. When work must be performed on energized equipment or circuits, use personnel experienced in such operations.

D. Existing Electrical Service: Maintain existing system in service until new system is complete and ready for service. Disable system only to make switchovers and connections. Minimize outage duration.

1. Obtain permission from Owner at least 24 hours before partially or completely disabling system.

2. Make temporary connections to maintain service in areas adjacent to work area.

E. Existing Fire Alarm System: Maintain existing system in service until new system is accepted.

Disable system only to make switchovers and connections. Minimize outage duration.

3.03 DEMOLITION AND EXTENSION OF EXISTING ELECTRICAL WORK A. Remove, relocate, and extend existing installations to accommodate new construction.

B. Remove abandoned wiring to source of supply.

C. Remove exposed abandoned conduit, including abandoned conduit above accessible ceiling finishes. Cut conduit flush with walls and floors, and patch surfaces.

D. Disconnect abandoned outlets and remove devices. Remove abandoned outlets if conduit servicing them is abandoned and removed. Provide blank cover for abandoned outlets that are not removed.

E. Disconnect and remove electrical devices and equipment serving utilization equipment that has been removed.

F. Repair adjacent construction and finishes damaged during demolition and extension work.

G. Maintain access to existing electrical installations that remain active. Modify installation or provide access panel as appropriate.
9/23/2025

9.f
January 26, 2026 Packet Pg. 222
2300283 LED Lighting Conversions at Burton & Highlands Parks 1/8/2024 SELECTIVE DEMOLITION FOR ELECTRICAL
26 05 05 - 2
H. Extend existing installations using materials and methods compatible with existing electrical installations, or as specified.

3.04 CLEANING AND REPAIR
A. See Section 01 74 19 - Construction Waste Management and Disposal for additional requirements.

B. Clean and repair existing materials and equipment that remain or that are to be reused.

C. Panelboards: Clean exposed surfaces and check tightness of electrical connections. Replace damaged circuit breakers and provide closure plates for vacant positions. Provide typed circuit directory showing revised circuiting arrangement.

D. Luminaires: Remove existing luminaires for cleaning. Use mild detergent to clean all exterior and interior surfaces; rinse with clean water and wipe dry. Replace lamps, ballasts and broken electrical parts.

END OF SECTION
9/23/2025

9.f
January 26, 2026 Packet Pg. 223
2300283 LED Lighting Conversions at Burton & Highlands Parks 1/8/2024 ELECTRICAL GENERAL PROVISIONS
26 05 10 - 1
SECTION 26 05 10

ELECTRICAL GENERAL PROVISIONS
PART 1 GENERAL

1.01 SECTION INCLUDES
A. Furnish all labor, materials, apparatus, tools, equipment, transportation, temporary construction and special or occasional services as required to make a complete working electrical installation, as shown on the drawings or described in these specifications.

1.02 REFERENCES
A. Reference to codes, standards, specifications and recommendations of technical societies, trade organizations and governmental agencies shall mean the latest edition of such publications adopted and published prior to submittal of the bid proposed. Such codes or standards shall be considered a part of this specification as though fully repeated herein.

B. When codes, standards, regulations, etc., allow work of lesser quality or extent than is specified under this Division, nothing in said codes shall be construed or inferred as reducing the quality, requirements or extent of the drawings and specifications.

C. California Code of Regulations (CCR) Title 24, Part 3, Basic Electrical Requirements, State Building Standards Electrical Code
D. National Fire Protection Association (NFPA).

E. Equipment and materials specified under this Division shall conform to the following standards where applicable:

1. UL Underwriters' Laboratories

2. ASTM American Society for Testing Materials

3. CMB Certified Ballast Manufacturers

4. IPCEA Insulated Power Cable Engineer Assoc.

5. NEMA National Electrical Manufacturer's Assn.

6. ANSI American National Standards Institute

7. ETL Electrical Testing Laboratories
F. All base material shall be ASTM and/or ANSI standards.

G. All electrical apparatus furnished under this Section shall conform to National Electrical Manufacturers Association (NEMA) standards and the NEC and bear the Underwriters' Laboratories (UL) label where such label is applicable.

1.03 SUBMITTALS
A. See Division 1 for submittal procedures.

B. Where items are noted as "or equal" a product of equal design, construction and performance will be considered. Contractor must submit all pertinent test data, catalog cuts and product information required to substantiate that the product is in fact equal. Refer to Division 1, General Requirement for additional requirements. Only one substitution will be considered for each product specified.

C. Submittals shall consist of detailed shop drawings, specifications, "catalog cuts" and data sheets containing physical and dimensioned information, performance data, electrical characteristics, material used in fabrication , material finish and shall clearly indicate those optional accessories which are included and those which are excluded. Shop drawings shall be prepared using AutoCAD 2018, Revit 2019, or later editions.

1.04 CUTTING, PAINTING AND PATCHING
A. Structural members shall in no case be drilled, bored or notched in such a manner that will impair their structural value. Cutting of holes, if required, shall be done with core drill and only with the approval of the Engineer.

B. Cutting and digging shall be under the direct supervision of the General Contractor. Include as necessary for the work in this section.
9/23/2025

9.f
January 26, 2026 Packet Pg. 224
2300283 LED Lighting Conversions at Burton & Highlands Parks 1/8/2024 ELECTRICAL GENERAL PROVISIONS
26 05 10 - 2
C. The contractor shall be responsible for returning any surface from which he has removed equipment or devices to the condition and finish of the adjacent surfaces.

1.05 SUPERVISION
A. Contractor shall personally or through an authorized and competent representative constantly supervise the work from beginning to completion and, within reason, keep the same workmen and foreman on the project throughout the project duration.

1.06 PROTECTION
A. Keep conduits, junction boxes, and outlet boxes, and other openings closed to prevent entry of foreign matter: cover fixtures, equipment, and apparatus and protect against dirt, paint, water, chemical, or mechanical damage, before and during construction period. Restore to original condition any fixture, apparatus, or equipment damaged prior to final acceptance, including restoration of damaged shop coats of paint, before final acceptance. Protect bright finished surfaces and similar items until in service. No rust or damage will be permitted.

1.07 EXAMINATION OF SITE
A. The Contractor shall visit the site and determine the locale, working conditions, conflicting utilities, and the conditions in which the electrical work will take place. No allowances will be made subsequently for any costs which may be incurred because of any error or omission due to failure to examine the site and to notify the Engineer of any discrepancies between drawings and specifications and actual site conditions. Schedule visits at least 1 week in advance with Owner's Maintenance staff.

1.08 ENVIRONMENTAL REQUIREMENTS
A. After other work such as sanding, painting etc. has been completed, clean lighting fixtures, panelboards, switchboards, and other electrical equipment to remove dust, dirt, and grease, or other marks, and leave work in clean condition.

1.09 VOLTAGE CHECK
A. At completion of job, check voltage at several points of utilization on the system which has been installed under this contract. During test, energize all loads installed. Measure 3-Phase voltages and note percentage differences. Submit report to Engineer. Include copy in O&M Manual.

1.10 TESTS
A. Perform tests as specified to prove installation is in accordance with contract requirements.

Perform tests in the presence of the Engineer and furnish test equipment, facilities, and technical personnel required to perform tests. Tests shall be conducted during the construction period and at completion to determine conformity with applicable codes and with these Specifications. Tests, in addition to specific system test described elsewhere, shall include:

1. Insulation Resistance: All 600 volt insulation shall be tested at 1,000 volts D.C for one minute on all feeder and branch circuit conductors including the neutral, and make a typed record of all readings to be included in the maintenance instructions. The direct current amperes shall be recorded at start and at one minute. The value shall be declining and not more than one microampere.

2. Circuit Continuity: Test all feeder and branch circuits for continuity. Test all neutrals for improper ground.

B. Equipment Operations: Test motors for correct operation and rotation.

C. Product Failure: Any products which fail during the tests or are ruled unsatisfactory by the Engineer shall be replaced, repaired, or corrected as prescribed by the Engineer at the expense of the Contractor. Tests shall be performed after repairs, replacements, or corrections until satisfactory performance is demonstrated.

D. Miscellaneous: Include all test results in the maintenance manual. Cost, if any , for all tests shall be paid by the Contractor.
9/23/2025

9.f
January 26, 2026 Packet Pg. 225
2300283 LED Lighting Conversions at Burton & Highlands Parks 1/8/2024 ELECTRICAL GENERAL PROVISIONS
26 05 10 - 3

1.11 DRAWINGS
A. Layout: General layout shown on the drawing shall be followed except where other work may conflict with the drawings.

B. Accuracy:

1. Drawings for the work under this section are diagrammatic.

2. Contractor shall verify lines, levels, and dimensions shown on the drawings and shall be responsible for the accuracy of the setting out of work and for its strict conformance with existing conditions at the site.

3. Contractor shall insure reconnection of existing equipment and circuits affected by contract demolition whether or not reconnection is specifically shown on the contract documents.

1.12 PROJECT RECORD DRAWINGS
A. Refer to General Conditions for contractual requirements. Provide project record drawings as required by the General Provisions of the specifications and as required herein. Such drawings shall fully represent installed conditions including actual locations of outlets, true panelboard connections following phase balancing routines, correct conduit and wire sizing as well as routing, revised fixture schedule listing the manufacturer and products actually installed and revised panel schedule. All changes to drawings shall be made by qualified draftspersons to match existing linework and lettering as close as possible. When all the changes have been made to the trade drawings, contractor shall produce one (1) full size (E-Size) updated set of trade drawing(s) utilizing AutoCad 2018 or newer and supply one (1) set of USB Flash Drive (USB) reflecting same.

1.13 MAINTENANCE AND OPERATING INSTRUCTIONS
A. Furnish to the Engineer four (4) hard back 3-ring binders containing all bulletins, operating and maintenance instructions and part lists and other pertinent information for each and every piece of equipment furnished under this specification. Include service telephone numbers. Each binder shall be indexed into sections and labeled for easy reference. Bulletins containing more information than the equipment concerned shall be properly stripped and assembled.

B. At the time of completion, a period of not less than eight hours shall be allotted by the Contractor for instruction of building operating and maintenance personnel in the use of all systems. All personnel shall be instructed at one time, the Contractor making all necessary arrangements with manufacturer's representative. The equipment manufacturer shall be requested to provide product literature and application guides for the user's reference. Costs, if any for the above services shall be paid by the Contractor.

1.14 WARRANTIES
A. Furnish to the Engineer four (4) hard back 3-ring binders containing all warranties of every piece of equipment furnished under this specification. Include terms and limitations of warranties, contact names, addresses, and telephone numbers of manufacturer. Each binder shall be indexed into sections and labeled for easy reference for each equipment warranty.

1.15 EXTRA MATERIALS
A. See Division 1 - Product Requirements, for additional provisions.

B. All special tools for proper operation and maintenance of the equipment provided under this Section shall be delivered to the District's representative PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION

3.01 WORKMANSHIP
A. Preparation, handling, and installation shall be in accordance with manufacturer's written instructions and technical data particular to the product specified and/or accepted equal except as otherwise specified. Coordinate work and cooperate with others in furnishing and placing this work. Work to reviewed shop drawings for work done by others and to field measurements as necessary to properly fit the work.
9/23/2025

9.f
January 26, 2026 Packet Pg. 226
2300283 LED Lighting Conversions at Burton & Highlands Parks 1/8/2024 ELECTRICAL GENERAL PROVISIONS
26 05 10 - 4
B. Conform to the National Electrical Contractor's Association "Standard of Installation" for general installation practice.

3.02 INSTALLATION
A. Install in accordance with manufacturer's instructions.

END OF SECTION
9/23/2025

9.f
January 26, 2026 Packet Pg. 227
2300283 LED Lighting Conversions at Burton & Highlands Parks 1/8/2024 BASIC MATERIAL AND METHODS
26 05 12 - 1
SECTION 26 05 12

BASIC MATERIAL AND METHODS
PART 1 GENERAL

1.01 SECTION INCLUDES
A. Conduit, raceways and fittings.

B. Wires and Cables for 600 Volts and less.

C. Wire connections.

D. Wire devices.

E. Outlet boxes.

F. Pull and junction boxes.

G. Fuses.

H. Supporting Devices.

I. Identifying Devices.

J. Grounding and Bonding

1.02 SUBMITTALS
A. Submit in accordance with the requirements of Division 1 the following items:

1. A list of conduit types indicating where each type of conduit will be used. Indicate conduit manufacturers and fittings to be used.

2. Wires and Cables.

3. Wiring Devices and Plates

4. Nameplates, including engraving schedules where engraved plates are specified.

5. Fused disconnect switches.

1.03 QUALITY ASSURANCE
A. Conform to requirements of NFPA 70.

B. Products: Listed and classified by Underwriters Laboratories, Inc. as suitable for the purpose specified and indicated.

1.04 REFERENCES
A. NFPA 70-2017 - National Electrical Code; 2017.

B. ANSI C80.1 - Rigid Steel Conduit, Zinc Coated - latest edition.

C. ANSI C80.3 - Electrical Metallic Tubing, Zinc Coated - latest edition.

D. NECA (INST) - Standard of Installation; National Electrical Contractors Association - latest edition.

E. NEMA FB 1 - Fittings, Cast Metal Boxes, and Conduit Bodies for Conduit and Cable Assemblies; latest edition.

F. NEMA RN 1 - Polyvinyl Chloride (PVC) Externally Coated Galvanized Rigid Steel Conduit and Intermediate Metal Conduit - latest edition.

G. NEMA TC 2 - Electrical Plastic Tubing (EPT) and Conduit (EPC-40 and EPC-80) - latest edition.

H. NEMA TC 3 - PVC Fittings for Use with Rigid PVC Conduit and Tubing - latest edition.

I. NFPA 70 - National Electrical Code - latest edition.

PART 2 PRODUCTS

2.01 CONDUIT, RACEWAYS AND FITTINGS
A. Rigid Steel Conduit

1. Rigid steel conduit shall be full weight, pipe size, finished inside and out by hot-dip galvanizing after fabrication, and shall conform with ANSI C80.1 and UL.

2. Couplings shall be electroplated steel.
9/23/2025

9.f
January 26, 2026 Packet Pg. 228
2300283 LED Lighting Conversions at Burton & Highlands Parks 1/8/2024 BASIC MATERIAL AND METHODS
26 05 12 - 2

3. Insulating Bushings: Threaded polypropylene or thermo-setting phenolic rated 150°C minimum.

4. Insulated grounding Bushings: Threaded cast malleable iron body with insulated throat and steel "lay-in" ground lug with compression screw.

5. Insulated Metallic Bushings: Threaded cast malleable iron body with plastic insulated throat rated 150°C.

6. Running threads are not acceptable.

B. Electrical Metallic Tubing (EMT):

1. Conduit: Conduit shall be formed of cold rolled strip steel, and shall comply with ANSI C80.3 and UL requirements.

2. Couplings: Electroplated steel, UL listed rain and concrete tight through 1-1/4" trade size.

All EMT fittings shall be compression type.

3. Connectors: Steel, gland compression type with insulated plastic throat, 150°C temperature rated. All EMT fittings shall be compression type.

C. Liquid Tight Flexible Metal Conduit:

1. Conduit: Conduit shall be fabricated in continuous lengths from galvanized steel strip, spirally wound. Flexible conduit, except where installed in concealed dry locations, shall be liquid tight with plastic jacket extruded over the outer zinc coating. No aluminum substitute will be accepted.

2. Fittings: Connectors shall be the screw clamp on screw-in (Jake) variety with cast malleable iron bodies and threaded male hubs with insulated throat or insulated bushings.

Set screw type connectors are not acceptable. Liquid tight fittings shall be of cadmium plated cast malleable iron, with insulated throat.

D. Rigid Non-Metallic Conduit:

1. Conduit and fittings shall be homogeneous plastic material free from visible cracks, holes or foreign inclusions. The conduit bore shall be smooth and free of blisters, nicks or other imperfections which could damage conductors or cables.

2. Materials: Polyvinyl Chloride (PVC) schedule 40. Material shall comply with NEMA TC-2 for conduit and NEMA TC-3 for fittings.

2.02 WIRING AND CABLES
A. Acceptable manufacturers: Southwire, or approved equal.

B. Conductor material: All wire and cable shall be insulated, stranded copper conductors. Soft drawn annealed copper wire 98% conductivity, bearing the UL label.

C. Minimum conductor size: AWG No.10 for all power and lighting branch circuits, unless specified otherwise on drawing notes. AWG No. 14 for all signal and control circuits.

D. Color Coding: System conductors shall be identified as to voltage and phase connections by means of color impregnated insulation or approved colored marking tape as follows:

E. For 120/240 volt, single phase, 3 wire system.

1. Phase A - Black

2. Phase B - Red

3. Phase C - Orange for High Leg (208v to neutral)

4. Neutral - White

5. Ground - Green
F. For 120/208 volt, 3 phase, 4 wire systems.

1. Phase A - Black

2. Phase B - Red

3. Phase C - Blue

4. Neutral - White

5. Ground - Green
G. for 277/480 Volt, 3 phase, 4 wire system

1. Phase A - Brown
9/23/2025

9.f
January 26, 2026 Packet Pg. 229
2300283 LED Lighting Conversions at Burton & Highlands Parks 1/8/2024 BASIC MATERIAL AND METHODS
26 05 12 - 3

2. Phase B - Orange

3. Phase C - Yellow

4. Neutral - Grey

5. Ground - Green
H. Secondary Wire and Cable, 0 to 600 Volts;

1. NEC Type THWN, or Type XHHW for feeders and branch circuits in wet or dry locations.

NEC type THHN for branch circuits in dry locations.

2. Electrical conductors serving equipment supplied by power conversion equipment as part of a variable frequency drive (VFD) system and/or a servo drive system shall have thermoset insulation type XHHW, or XHHW-2.

2.03 WIRE CONNECTION
A. Wire Joints: Wires in sizes from #18 to #8 AWG, stranded conductor, with insulation rated 105 degrees C. or less shall be joined with electrical spring connectors of three part construction incorporating a non-restricted, zinc coated steel spring enclosed in a steel shell with an outer jacket of vinyl plastic with a flexible insulating skirt.

B. Mechanical Compression Connectors and Taps: Stranded conductors from #6 AWG to 750 Kcmil shall be joined or tapped using bolted pressure connectors having cast bronze compression bolts. Fittings shall be wide range-taking and designed to facilitate the making of parallel taps, tees, crosses or end-to-end connections. Split-bolt connectors will not be acceptable.

C. Fixture Connections: Splice fixture wire to circuit wiring with solderless connectors as specified above in paragraph A.

D. Terminating Lugs: Conductors from size No. 6 AWG to 750 Kcmil, copper, shall be terminated using tin plated hydraulically operated crimping tools and dies as stipulated by the lug manufacturer. Lugs shall be 3M "Scotchlok" series 30000, Burndy Type Ya-L series, or equal.

E. Splicing and Insulating Tape (600 volts and below): General purpose electrical tape shall be suitable for temperatures from minus 18 degrees C to 105 degrees C, shall be black, ultraviolet proof, self-extinguishing, 7 mil thick vinyl with a dielectric strength of 10,000 volts. Apply 4 layers half-lap with 2” over-lay on each conductor.

F. Insulating Putty (600 volts and below): Pads or rolls of non-corrosive, self-fusing, one eight inch thick rubber putty with PVC backing sheet. Putty shall be suitable for temperatures from minus

17.8 degrees C to 37.8 degrees C and shall have a dielectric strength of 570 volts/mil minimum.

G. Insulating Resin: Two Part liquid epoxy resin with resin and catalyst in pre measured, sealed mixing pouch. Resin shall have a set up time of approximately 30 minutes at 21.1 degrees C, and shall have thermal and dielectric properties equal to the insulation properties of the cables immersed in the resin.

H. Terminal Strip Connectors: Terminate wire in locking tongue style, pressure type, solderless lug where applicable.

2.04 WIRING DEVICES
A. Switches: Specification grade, flush mounting, quiet operating AC type, with toggle operator, heat resistant plastic housing and self grounding metal strap. Silver or silver alloy contact. Rated 20A at 120-277V and capable of full capacity on tungsten or fluorescent lamp load. Design for up to #10 wire. Use single pole, double pole, three-way, four-way, lighted, pilot, or keyed type, as indicated on drawings or required. Provide white color unless otherwise noted.

Manufacturer: Leviton, Arrow Hart, or Hubbell.

B. Receptacles: Specification grade, flush mounting receptacles with nylon face. High grade brass allow triple wipe contacts. Provide 2 pole, 3 wire grounding type with a green colored brass hexagonal equipment grounding screw. Grounding shall be rivetless, single piece brass with no mechanical connections in the primary path between point of ground wire termination and ground blades. Use 20A rated receptacles, white in color, unless otherwise noted.

Manufacturer: Leviton, Arrow Hart, or Hubbell.
9/23/2025

9.f
January 26, 2026 Packet Pg. 230
2300283 LED Lighting Conversions at Burton & Highlands Parks 1/8/2024 BASIC MATERIAL AND METHODS
26 05 12 - 4

1. Isolated Ground - Provide separate path to ground, with orange faceplate or triangle to indicated isolated ground

2. GFCI - Equipped with diagnostic indicator for miswiring.

3. Weatherproof - GFCI type, outdoor rated, with metal lockable while in use cover C. Faceplates: Provide nylon cover faceplates for wall receptacles, outlets, and switches. Include thermal mounting screws that match plate and device color. Manufacturer: Leviton, Arrow Hart, or Hubbell.

2.05 OUTLET BOXES
A. Standard outlet boxes: Galvanized, die formed or drawn steel, knock-out type of size and configuration best suited to the application indicated on the plans. Minimum box size, 4 inch square by 1-1/2 inch deep, indoor use. FS cast boxes are required for outdoor use.

B. Cast Metal Outlet Boxes: FS/FD cast boxes are required for outdoor use. Malleable iron alloy with threaded hubs and mounting lugs as required. Boxes shall be furnished with cast cover plates of the same material as the box and neoprene cover gaskets. Thomas and Betts, Crouse-Hinds, Appleton or equal.

C. Conduit Outlet Bodies: Cadmium plated, cast iron alloy. Obround conduit outlet bodies with threaded conduit hubs and neoprene gasketed, cast iron covers. Outlet bodies shall be used to facilitate pulling of conductors or to make changes in conduit direction only. Splices are not permitted in conduit outlet bodies. Thomas and Betts, Crouse Hinds Form 8 Condulets, Appleton form 35 Unilets, or equal.

2.06 PULL AND JUNCTION
A. Sheet Metal Boxes: Use standard outlet or concrete ring boxes wherever possible; otherwise use minimum 15 gauge get metal, NEMA 1 boxes, sized to code requirements with covers secured by cadmium plated machine screws located 6 inches on centers. Circle AW Products, Hoffman Engineering Co., or equal.

B. Cast Metal Boxes: Use standard cast malleable iron outlet or device boxes wherever possible; otherwise use cadmium plated, cast malleable iron junction boxes with bolt-on, interchangeable conduit hub plates with neoprene gaskets. Appleton FS/FD series; Crouse Hinds FS/FD series, or equal.

2.07 FUSES
A. Dual Element, Time Delay, UL Class RK5. Rejection type. Size and Voltage as indicated on equipment. Bussman, Little Fuse, or approved equal.

2.08 ELECTRICAL SUPPORTING DEVICES
A. Concrete Fasteners: Hilti Kwik Bolt TZ or equal, self drilling expansion type concrete anchor.

B. Conduit Straps: Hot-dip galvanized, cast malleable iron, two hole type strap with cast clamp-backs and spacers as required. OZ/Gedney, Thomas & Betts, or equal.

C. Construction Channel: 1-1/2 inch by 1-1/2 inch 12 gauge galvanized steel channel with 17/32 inch diameter bolt holes, 1-1/2 inch on center, in the base of the channel. Kindorf 905 series, Unistrut P-1000-HS or equal.

D. Cable Ties and Clamps: Thomas and Betts Co. "Ty-Raps" Panduit "Pan-Ty" or equal one piece, nylon, reusable type lashing ties.

E. Fasteners (General) : Wood screws for fastening to wood. Machine screws for fastening to steel. Toggle bolts for fastening to hollow concrete block, gypsum board, or plaster walls.

Expansion anchors for attachments to pre-poured concrete.

2.09 IDENTIFYING DEVICES
A. Nameplates: Type NP: Engraved black bakelite, 1 inch by 3-1/2 inch, 1/8 inch high white letters, machine screw retained. For permanent identification of all switchboards, panelboards, circuit breakers in separate enclosures, motor starters, relays, time switches, disconnect switches and other cabinet-enclosed apparatus including terminal cabinets or match existing as closely as possible.
9/23/2025

9.f
January 26, 2026 Packet Pg. 231
2300283 LED Lighting Conversions at Burton & Highlands Parks 1/8/2024 BASIC MATERIAL AND METHODS
26 05 12 - 5
B. Legend Plates: Type LP: Die-stamped metal legend plate with mounting hole and positioning key for attachment to panel mounted operators' devices. Engraved paint-filled characters as specified.

C. Wire & Terminal Markers: Self-adhering, pre-printed vinyl with self-laminating wrap around strip. Markers shall be legible after termination. Brady B191 series, Thomas & Betts WSL series or equal.

D. Conductor Phase Markers: Thomas & Betts WCPHAS series or similar in addition to colored marking as specified under this section of the specifications.

2.10 GROUNDING AND BONDING
A. Ground Rods

1. Manufacturer: Blackburn, Erico, or approved Equal

2. Size: 3/4" x 10' Ground Rods
B. Grounding Electrode Conductor, 2/0 for foundation foots, and per NEC.

C. Grounding Well - Christy Box, G5 Traffic Valve Box.

PART 3 EXECUTION

3.01 CONDUIT AND RACEWAY APPLICATIONS
A. Rigid Steel Conduit: Use rigid steel conduit for the following locations or conditions:

1. All exterior applications

2. All conduits larger than 2” trade diameter.

3. All conduits indoor below eight (8) feet above finished floor.

B. Electrical Metallic Tubing (EMT): EMT is allowed for the following conditions:

1. Interior only and above eight (8) feet from finished floor.

2. Interior only and when entering a panel from above.

C. Liquidtight Flexible Metallic Conduit: Use Liquidtight for the following conditions:

1. In damp and wet locations for connections to motors, transformers, vibrating equipment and machinery.

2. Connections to all pump motors, flow switches, and similar devices.

D. Rigid Non-Metallic Conduit, Polyvinyl Chloride (PVC) Schedule 40:

1. Underground installation.

3.02 CONDUIT INSTALLATION
A. General

1. All conduit runs shown on the plans are sized based on the use of rigid steel conduit and THWN copper conductors. If conductor type is changed the contractor shall be responsible for resizing conduits to meet code. In no case is conduit to be sized smaller than 3/4" trade diameter.

2. Low voltage wiring shall be installed in conduit, minimum 3/4" trade diameter.

3. Conduits shall be tightly covered and well protected during construction using metallic bushings and bushing "pennies" to seal open ends.

4. In making joints in rigid steel conduit, ream conduit smooth after cutting and threading.

5. Clean any conduit in which moisture or any foreign matter has collected before pulling in conductors. Paint all field threaded joints to prevent corrosion.

6. In all empty conduits or ducts, install an 1100 pound tensile strength polyethylene pulling rope.

7. Conduit systems shall be electrically continuous throughout. Install code size, uninsulated, copper grounding conductors in all conduit runs, grounding conductor shall be bonded to conduit, equipment frames and properly grounded.

B. Layout:

1. All new conduits shall be concealed. Any field conditions that does not allow concealment of conduits shall be reviewed with the Engineer prior to rough-in. 9/23/2025

9.f
January 26, 2026 Packet Pg. 232
2300283 LED Lighting Conversions at Burton & Highlands Parks 1/8/2024 BASIC MATERIAL AND METHODS
26 05 12 - 6

2. Locations of conduit runs shall be planned in advance of the installation and coordinated with concrete work, plumbing and framing.

3. Where practical install conduits in groups in parallel vertical or horizontal runs and at elevations that avoid unnecessary off-sets.

4. Low voltage conduit shall be grouped separately and labelled every 10 ft interval as to system (i.e. fire, control, etc)

5. Exposed conduit shall be run parallel or at right angles to the centerlines of the columns and beams.

6. Conduits shall not be placed closer than 12 inches from a parallel hot water or steam line or three inches from such lines crossing perpendicular to the runs.

7. In long runs of conduit, provide sufficient pull boxes per NEC inside buildings to facilitate pulling wires and cables. Support pull boxes from structure independent of conduit supports. These pull boxes are not shown on the plans.

C. Supports:

1. All raceway systems shall be secured to building structures using specified fasteners, clamps and hangers spaced according to Code.

2. Support single runs of conduit using two hole pipe straps. Where run horizontally on walls in damp or wet locations, install "clamp blocks" to space conduit off the surface.

3. Multiple conduit runs shall be supported using "trapeze" hangers fabricated from 3/8 inch diameter, threaded steel rods secured to building structures. Fasten conduit to construction channel with standard two hole pipe clamps. Provide lateral seismic bracing for hangers.

4. Installation
a. Locate and install anchors, fasteners, and supports in accordance with NECA "Standard of Installation".
1) Do not fasten supports to pipes, ducts, mechanical equipment, or conduit. 2) Do not drill or cut structural members.
b. Rigidly weld support members or use hexagon-head bolts to present neat appearance with adequate strength and rigidity. Use spring lock washers under all nuts. c. Install surface-mounted cabinets and panelboards with minimum of four anchors. d. In wet and damp locations use steel channel supports to stand cabinets and panelboards 1 inch off wall.
e. Use sheet metal channel to bridge studs above and below cabinets and panelboards recessed in hollow partitions.

D. Terminations and Joints:

1. Raceways shall be joined using specified couplings or transition couplings where dissimilar raceway systems are joined.

2. Rigid conduit connection to enclosures shall be made by Myers type grounding hubs only.

EMT connections to enclosures shall be made with compression connector with grounding lock-nuts or bushings.

3. Conduit terminations exposed at weatherproof enclosures and cast outlet boxes shall be made watertight using appropriate connectors and hubs.

4. Install expansion couplings where any conduit crosses a building separation or expansion joint.

5. Install cable sealing bushings on all conduits originating outside the building walls and terminating in switchgear, cabinets or gutters inside the building. Install cable sealing bushings or caulk conduit terminations in all grade level or below grade exterior pull, junction or outlet boxes.

E. Penetrations:

1. Furnish and install metal sleeves for all exposed interior conduit runs passing through concrete floors or walls. Following conduit installation, seal all penetrations using non-iron bearing, chloride free, non-shrinking, dry-pack, grouting compound. 9/23/2025

9.f
January 26, 2026 Packet Pg. 233
2300283 LED Lighting Conversions at Burton & Highlands Parks 1/8/2024 BASIC MATERIAL AND METHODS
26 05 12 - 7

2. Install specified watertight conduit entrance seals and membrane clamps at all below grade wall and floor penetrations. Conduits penetrating exterior building walls and building floor slab shall be insulated rigid steel.

3. Conduits penetrating rated walls, floors, etc. shall be fireproofed.

3.03 CABLE AND WIRE INSTALLATION
A. Examination

1. Verify that interior of building has been protected from weather.

2. Verify that mechanical work likely to damage wire and cable has been completed.

3. Verify that raceway installation is complete and supported.

4. Verify that field measurements are as indicated.

B. Preparation

1. In existing conduits that will be reused, pull out existing conductors.

2. Completely and thoroughly swab raceway before installing wire.

3. Use 50/50 solution of Simple Green. Use CO2 to blow water and soap into conduit - let soak to break up dried out pulling compounds, then pull conductors. Pull one conductor at a time if will not pull all out together.

C. General:

1. Conductors shall not be in conduit until all work of any nature that may cause injury is completed. Care should be taken in pulling conductors that insulation is not damaged.

U.L. approved non-petroleum base and insulating type pulling compound shall be used as needed.

2. All cables shall be installed and tested in accordance with manufacturer's requirements and warranty.

3. Block and tackle, power driven winch or other mechanical means shall not be used in pulling conductors of size smaller than AWG # 1.

D. Splicing and Terminating:

1. All aspects of splicing and terminating shall be in accordance with cable manufacturer's published procedures.

2. Make up all splices in outlet boxes with connectors as specified herein with separate tails of correct color to be made up to splice. Provide at least six (6) inches of tails packed in box after splice is made up.

3. All wire and cable in panels, control centers and equipment enclosures shall be bundled and clamped.

4. Encapsulate splices in exterior outlet, junction and pull boxes using insulating resin kits.

All splices for exterior equipment in pump rooms shall be made up watertight.

5. Insulate mechanical compression taps AWG #1/0 and larger using pre-molded heat shrink tubing ITCSN Heaving Wall rated to 600V. Heating process should start from the middle of the heat shrink tubing and move to its ends.

E. Identification:

1. Securely tag all branch circuits, noting the purpose of each. Mark conductors with vinyl wrap-around markers. Where more than two conductors run through a single outlet, mark each circuit with the corresponding circuit number at the panelboard.

2. Color code conductors size #6 and larger using specified phase color markers and identification tags.

3. All terminal strips are to have each individual terminal identified with specified vinyl markers.

4. All identification shall be legible and readable after completion of installation.

5. Provide labeling for all switches and receptacle outlets. Self-adhering machine clear tape with black letters.

3.04 INSTALLATION:

A. Route wire and cable as required to meet project conditions.

1. Wire and cable routing indicated is approximate unless dimensioned. 9/23/2025

9.f
January 26, 2026 Packet Pg. 234
2300283 LED Lighting Conversions at Burton & Highlands Parks 1/8/2024 BASIC MATERIAL AND METHODS
26 05 12 - 8

2. Where wire and cable destination is indicated and routing is not shown, determine exact routing and lengths required.

3. Include wire and cable of lengths required to install connected devices within 10 ft of location shown.

B. Install wire and cable in accordance with the NECA "Standard of Installation." C. Use wiring methods indicated.

D. Pull all conductors into raceway at same time.

E. Use suitable wire pulling lubricant for building wire 4 AWG and larger.

F. Protect exposed cable from damage.

G. Support cables above accessible ceiling, using spring metal clips or metal cable ties to support cables from structure or ceiling suspension system. Do not rest cable on ceiling panels.

H. Use suitable cable fittings and connectors.

I. Neatly train and lace wiring inside boxes, equipment, and panelboards.

J. Clean conductor surfaces before installing lugs and connectors.

K. Make splices, taps, and terminations to carry full ampacity of conductors with no perceptible temperature rise.

L. Use solderless pressure connectors with insulating covers for copper conductor splices and taps, 8 AWG and smaller.

M. Use insulated spring wire connectors with plastic caps for copper conductor splices and taps, 10 AWG and smaller.

N. Trench and backfill for direct burial cable installation as specified in Underground Structure Section. Install warning tape along entire length of direct burial cable.

O. Identify and color code wire and cable. Identify each conductor with its circuit number or other designation indicated.

3.05 ELECTRICAL CONNECTIONS
A. Make electrical connections in accordance with equipment manufacturer's instructions.

B. Make conduit connections to equipment using flexible conduit. Use liquidtight flexible conduit with watertight connectors in damp or wet locations.

C. Connect heat producing equipment using wire and cable with insulation suitable for temperatures encountered.

D. Provide receptacle outlet to accommodate connection with attachment plug.

E. Provide cord and cap where field-supplied attachment plug is required.

F. Install suitable strain-relief clamps and fittings for cord connections at outlet boxes and equipment connection boxes.

G. Install disconnect switches, controllers, control stations, and control devices to complete equipment wiring requirements.

H. Install terminal block jumpers to complete equipment wiring requirements.

I. Install interconnecting conduit and wiring between devices and equipment to complete equipment wiring requirements.

3.06 INSTALLATION OF BOXES
A. General:

1. Leave no un-used openings in any box. Install close-up plugs as required to seal openings.

2. Exposed outlet boxes and boxes in damp or wet locations shall be cast metal with gasketed cast metal cover plates.

B. Box Layout:
9/23/2025

9.f
January 26, 2026 Packet Pg. 235
2300283 LED Lighting Conversions at Burton & Highlands Parks 1/8/2024 BASIC MATERIAL AND METHODS
26 05 12 - 9

1. Outlet boxes shall be installed at the locations and elevations shown on the drawings or specified herein. Make adjustments to locations as required by structural conditions and to suit coordination requirements of other trades.

2. Install junction or pullboxes where required to limit bends in conduit runs to not more than 360 degrees or where pulling tension achieved would exceed the maximum allowable for the cable to be installed. Consult wire and cable manufacturer.

3.07 INSTALLATION OF WIRING DEVICES
A. General

1. Install all devices flushmounted unless otherwise noted on the drawings. Comply with layout drawings for general locations. Consult Engineer or Owner's Representative for locations that have conflict with other devices or manner not suitable for installation. Avoid placing devices behind open doors.

2. Align devices horizontally and vertically. Device plates shall be aligned vertically with tolerance of 1/16". All four edges of device plates shall be in contact with the wall surface.

3. Mounting height as indicated on the drawings and according to ADA requirements.

4. Install device plates on all outlet boxes. Provide blank plates for all empty, spare, and boxes for future use.

5. Securely fasten devices into boxes and attach appropriate cover plates.

6. Caulk around edges or outdoor device plates and boxes when rough wall surfaces prevent raintight seal. Use caulking materials approved by Engineer. Fireproof around opening of devices located or penetrating firerated construction assemblies.

7. Fireproof around opening of devices located or penetrating firerated construction assemblies.

B. Switches

1. Where switches are indicated to be installed near doors, corner walls, etc. mount not less than 2 inches and not more than 18" from trim. Verify exact location with Architect or Engineer prior to rough-in.

2. Coordinate the location of switches to insure locations at the strike side of doors.

3. Furnish and install engraved legend of each switch that controls exhaust fans, motors, equipment systems, etc. not located within sight of the controlling switch.

4. Ganging of Switches - provide barriers for switches of difference phases and voltages.

Otherwise switches shall be gauged in one faceplate.

C. Receptacles

1. Mount receptacles vertically with U-shaped ground position on bottom.

2. Do not combine GFCI protected circuits with other circuits in the same raceway. Limit number of GFI protect circuits in any one raceway to a maximum of one (1) circuit.

D. Identification

1. Label all outlets and switches. Mark each wiring device where circuits and panel supply is derived from.

2. All identification shall be legible and readable after completion of installation

3.08 INSTALLATION OF FUSES AND DISCONNECT SWITCHES
A. Fuses shall be installed where noted on plans. Sizes are based on design data provided by equipment mfg. Listed or labeled equipment must be in accordance with instructions included in the listing or labeling. Be sure to observe maximum branch circuit fuse size labels.

B. Disconnect switches shall be mounted on the equipment, where possible. Coordinate with mechanical contractor to ensure switches are not mounted on a removable access panel.

C. Label each disconnect fuse with equipment tag as indicated in the single line diagram, or as directed.

3.09 ELECTRICAL EQUIPMENT GROUNDING
A. Ground non-current carrying metal parts of electrical equipment enclosures, frames, conductor raceways or cable trays to provide a low impedance path for line-to-ground fault current and to bond all non-current carrying metal parts together. Install a ground conductor in each raceway 9/23/2025

9.f
January 26, 2026 Packet Pg. 236
2300283 LED Lighting Conversions at Burton & Highlands Parks 1/8/2024 BASIC MATERIAL AND METHODS
26 05 12 - 10
system in addition to conductors shown. Equipment ground conductor shall be electrically and mechanically continuous from the electrical circuit source to the equipment to be grounded.

Size ground conductors per NEC 250 unless larger conductors are shown on the drawings.

B. Grounding conductors shall be identified with green insulation, except where a bare ground conductor is specified. Where green insulation is not available, on larger sizes, black insulation shall be used and suitably identified with green tape at each junction box or device enclosure.

C. Install metal raceway couplings, fittings and terminations secure and tight to insure good ground continuity. Provide insulated grounding bushing and bonding jumper where metal raceway is not directly attached to equipment metal enclosure and at concentric knock-outs.

D. Motors shall be connected to equipment ground conductors with a conduit grounding bushing and with a bolted solderless lug connection on the metal frame.

E. Conduit terminating in concentric knockouts at panelboards, cabinets and gutters shall have insulated grounding bushings and bonding jumpers installed interconnecting all such conduits and the panelboard cabinet, gutter, etc.

F. Performance:

1. Measure the resistance to ground of each ground rod before connection to the other ground rods. The resistance shall not exceed 25 ohms.
a. A single electrode which does not have a resistance to ground of 25 ohms or less shall be augmented by additional electrode(s).

2. Measure the resistance to ground of the total ground system with all connections completed. The resistance shall not exceed 2 ohms for primary services or 5 ohms for secondary services.

3. Tests of the resistance to ground shall be made using either the three point method or the fall-of-potential method.

4. Perform a continuity check from equipment ground bus bars and ground lugs to the ground system.

3.10 BONDING
A. Bonding shall be provided to assure electrical continuity and the capacity to conduct safely any fault current likely to be imposed.

B. Bonding shall be in accordance with NEC Article 250, Part V.

3.11 INSTALLATION
A. Install in accordance with manufacturer's instructions.

END OF SECTION
9/23/2025

9.f
January 26, 2026 Packet Pg. 237

CITY COUNCIL

STAFF REPORT
MEETING DATE: January 26, 2026
ITEM TITLE: Adopt a Resolution Authorizing the City of San Carlos to Execute a Memorandum of Understanding (MOU) Regarding Composting with the County of San Mateo for Participation in the San Mateo Compost for Climate Solutions Program to Support Senate Bill 1383 Procurement Compliance.

RECOMMENDATION:

Staff recommend that the City Council adopt a Resolution authorizing the City of San Carlos to execute a Memorandum of Understanding (MOU) with the County of San Mateo for participation in the San Mateo Compost for Climate Solutions Program (CCSP or “Program”) to support Senate Bill (SB) 1383 Procurement Compliance.

FISCAL IMPLICATIONS:

There are no fiscal implications, and no additional funding is needed.

The City has received a grant from CalRecycle in the amount of $84,476.00. Staff propose contributing $58,790.25 of this grant to meet the City’s composting procurement requirement.

CalRecycle SB 1383 Local Assistance Grant Program $84,476.00 Grant spent to date $20,955.29
Balance $63,519.71
City’s contribution to meet the composting requirement per the MOU $58,790.25 Remaining grant balance to be used for other program requirements during the year
$4,729.46
The fiscal impact to the City of San Carlos in 2026 is limited to the contribution authorized through the MOU. The City has the option to contribute additional funds to the CCSP or other county-led projects for additional procurement credit under this MOU with additional written approval from the City. Participation provides a cost-effective and administratively efficient approach to meeting SB 1383 procurement requirements.

BACKGROUND:

In 2016, SB 1383 established statewide targets to reduce methane emissions from organic waste disposed in landfills. SB 1383 requires jurisdictions to reduce organic waste disposal by 75 percent from 2014 levels by 2025 and to procure significant quantities of recovered organic waste

9.g
January 26, 2026 Packet Pg. 238
products (ROWPs), such as compost, mulch, and renewable natural gas, on an annual basis.

Each jurisdiction, including the City of San Carlos, has been assigned an annual ROWP procurement target by the California Department of Resources Recycling and Recovery.

The CCSP was launched in 2021 as a collaborative effort among the County of San Mateo (“County”), the San Mateo Resource Conservation District, and the cities and towns within the county to help meet these requirements. Between 2021 and 2025, the CCSP procured and applied more than 30,000 tons of compost to local farms and rangelands, contributing to countywide procurement targets while improving soil health and climate resilience along the county’s coastline.

ANALYSIS:

Beginning in 2026, the County of San Mateo will serve as the administrator of the Program and will enter into a single intergovernmental agreement with the San Mateo Resource Conservation District to implement compost procurement, delivery, application, and required SB 1383 recordkeeping on behalf of participating jurisdictions.

Under this structure, the City of San Carlos would execute this MOU with the County and provide an annual financial contribution to the CCSP. In return, the City of San Carlos will receive SB 1383 procurement credit in proportion to its contribution, without the need to directly manage contracts, field activities, or carry out record keeping activities.

For calendar year 2026, the City of San Carlos proposes to contribute $58,790.25 which is anticipated to result in approximately 1,383.3 tons of recovered organic waste product procurement credit. Of this amount, the County will retain between two and four percent to offset staff time required to administer and coordinate the Program on the jurisdiction’s behalf. The final administrative percentage will be documented by the County for the City’s review.

The County will provide the City of San Carlos with procurement documentation and reporting information necessary for inclusion in the City of San Carlos’ Electronic Annual Report (EAR) to CalRecycle and will provide written program status updates.

Community Impact.

Participation in the Program is expected to increase access to cost-subsidized compost for local farms and ranches, improve soil health, enhance carbon sequestration, and support climateresilient agriculture. Compost application provides long-term environmental and economic benefits across the county.

ALTERNATIVES:

The alternatives available to the City Council include:

1. Adopt a Resolution authorizing the City of San Carlos to execute an MOU regarding composting with the County of San Mateo for participation in the San Mateo CCSP to support SB 1383 procurement compliance; or

2. Do not adopt the Resolution; or

3. Provide staff with alternative direction.

9.g
January 26, 2026 Packet Pg. 239
Respectfully submitted by:

Steven Machida, Public Works Director
Approved for submission by:
____________________________
Nil Blackburn, Interim City Manager
ATTACHMENT(S):

1. Resolution

2. San Mateo Compost for Climate Solution Program MOU

9.g
January 26, 2026 Packet Pg. 240
RESOLUTION NO. 2026 – ____

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SAN CARLOS

AUTHORIZING THE CITY OF SAN CARLOS TO EXECUTE A MEMORANDUM OF

UNDERSTANDING (MOU) REGARDING COMPOSTING WITH THE COUNTY OF SAN

MATEO FOR PARTICIPATION IN THE SAN MATEO COMPOST FOR CLIMATE SOLUTIONS PROGRAM TO SUPPORT SENATE BILL 1383 PROCUREMENT COMPLIANCE.

WHEREAS, Senate Bill 1383 (SB 1383) requires local jurisdictions to reduce organic waste disposal and annually procure recovered organic waste products (ROWPs), such as compost, to support greenhouse gas reduction and organic waste diversion goals; and WHEREAS, the California Department of Resources Recycling and Recovery (“CalRecycle”) has assigned the City of San Carlos an annual ROWP procurement target pursuant to SB 1383 regulations; and
WHEREAS, since 2021, the San Mateo County Compost for Climate Solutions Program (CCSP or “Program”) has delivered over 30,000 tons of compost to farms and ranches in San Mateo County, supporting soil health, carbon sequestration, and climate-resilient agricultural practices while contributing to the City of San Carlos’ SB 1383 compliance; and WHEREAS, beginning in 2026, the County of San Mateo will serve as CCSP administrator and will enter into a single intergovernmental agreement with the San Mateo Resource Conservation District to implement compost procurement, delivery, application, and required SB 1383 recordkeeping on behalf of participating jurisdictions; and WHEREAS, under this structure, participating cities will provide the County of San Mateo financial contribution to the CCSP in exchange for receiving SB 1383 procurement credit in proportion to their contribution and avoiding duplicative administrative effort; and WHEREAS, by participating in a County-administered program, City of San Carlos avoids the cost and staff time associated with developing and managing separate contracts, conducting procurement processes, coordinating field activities, and establishing recordkeeping and reporting processes, resulting in a more cost-effective and administratively efficient approach to SB 1383 compliance; and
WHEREAS, the City Council has reviewed the MOU as to form and substance and desires to enter into the agreement.

NOW, THEREFORE BE IT RESOLVED, that the San Carlos City Council hereby authorizes the Interim City Manager to execute the Memorandum of Understanding regarding composting with the County of San Mateo for participation in the San Mateo County Compost for Climate Solutions Program, for and on behalf of the City. * * * * *
I, City Clerk Crystal Mui, hereby certify that the foregoing Resolution was duly and regularly passed and adopted by the City Council of the City of San Carlos at a scheduled meeting thereof held on the 26th day of January 2026, by the following vote:

9.g
January 26, 2026 Packet Pg. 241
________________________________
CITY CLERK of the City of San Carlos
APPROVED:
___________________________
MAYOR of the City of San Carlos
AYES, COUNCILMEMBERS:

NOES, COUNCILMEMBERS:

ABSENT, COUNCILMEMBERS:

9.g
January 26, 2026 Packet Pg. 242
1 MEMORANDUM OF UNDERSTANDING

BETWEEN THE CITY OF SAN CARLOS AND THE COUNTY OF SAN MATEO

FOR THE SAN MATEO COUNTY COMPOST FOR CLIMATE SOLUTIONS

PROGRAM
THIS MEMORANDUM OF UNDERSTANDING (MOU), entered into on this 31st day of January 2026, by and between the County of San Mateo, hereinafter called "the County" and the City of San Carlos , hereinafter called "the Jurisdiction"; W I T N E S S E T H:

WHEREAS, the State of California enacted Senate Bill (SB) 1383 (Chapter 395, Statutes of 2016), which required the California Department of Resources Recycling and Recovery (CalRecycle) to adopt regulations to reduce organic waste disposal by 75 percent by 2025; and WHEREAS, the SB 1383 regulations (Title 14, Division 7, Chapter 12, Article 12 of the California Code of Regulations) require jurisdictions to procure recovered organic waste products (ROWPs) to meet annual targets set by CalRecycle; and WHEREAS, in 2021, the Jurisdiction, the County, and the San Mateo Resource Conservation District (RCD) launched the San Mateo County Compost for Climate Solutions Program (CCSP), which between 2021 and 2024 procured and applied 21,000 tons of costreduced compost for local farms and rangelands, contributing to countywide procurement targets; and
WHEREAS, the CCSP will conclude in 2026 unless a new agreement is established; and WHEREAS, all parties have recognized the value of continuing the CCSP to support SB 1383 compliance, leverage prior CalRecycle SB 1383 Local Assistance Grant investments and advance progress toward procurement targets; and
WHEREAS, the Jurisdiction shall determine its annual funding contribution to the CCSP and shall receive procurement credit in proportion to its contribution; and WHEREAS, the County has agreed to administer the CCSP on the Jurisdiction’s behalf to reduce collective staff time, duplicative administrative burdens and costs in exchange for an administrative fee; and
WHEREAS, the Jurisdiction will remain ultimately responsible for meeting its annual ROWP procurement targets.

NOW, THEREFORE, IT IS HEREBY AGREED BY THE PARTIES HERETO AS FOLLOWS:

1. Services to be Performed by the County
A. Program Administration

9.g
January 26, 2026 Packet Pg. 243
2 a. The County shall serve as program administrator, overseeing the agreement with the RCD to ensure coordination and successful implementation of the CCSP, in accordance with SB 1383 requirements. In this role, the County shall provide contract management, fiscal oversight, and coordination with participating jurisdictions.
b. The County shall serve as the direct service provider and allocate procurement credits in proportion to the Jurisdiction’s contribution to the CCSP. c. The County shall execute an intergovernmental agreement with the RCD by February 28, 2026, to implement the CCSP and shall maintain the agreement for the duration of this MOU.

B. Program Funding
a. The County shall invoice the Jurisdiction for an initial contribution, set by the Jurisdiction, for an amount not to exceed $58.790.25, by February 28, 2026. The initial contribution will fund the CCSP for calendar year 2026. Invoices may be issued after this date or divided into multiple billings if necessary to align with the Jurisdiction’s fiscal schedule. Of the total invoiced amount, the County will retain between 2% and 4% of the total amount to offset staff time costs required to administer the program. The County will track all administrative costs associated with the program and will furnish data to the Jurisdiction justifying the final administrative rate that will be retained. The rate will not exceed 4% in the first year of implementation. The percentage of funding retained for County administrative costs will be adjusted in future years based on the total staff time required to administer this program.
b. The County shall provide a CCSP Authorization Letter Template to the Jurisdiction, by September 1, 2026, and annually thereafter, for use in authorizing its continued participation in the CCSP for the next calendar year. In this letter, the Jurisdiction shall specify its total contribution, the anticipated tons of ROWP credit to be received, and the percent of its contribution that the County will retain to offset program administration costs. The letter shall be signed by an employee of the Jurisdiction who is authorized to commit and disburse funding to the CCSP. c. The County shall invoice the Jurisdiction for its contribution to the CCSP as defined in the CCSP Authorization Letter no later than January 30, 2027, and annually thereafter. If no authorization letter is provided for a given calendar year, the County shall not invoice the Jurisdiction.
d. The County shall carry forward any unspent CCSP contribution for the Jurisdiction’s future use in the program.

9.g
January 26, 2026 Packet Pg. 244
3 e. Upon termination of this MOU, the County shall return any unspent contributions to the Jurisdiction within sixty (60) days.

C. Recordkeeping & Reporting
a. The County shall provide the Jurisdiction with access to an online database containing all information related to CCSP activities, in compliance with SB 1383 recordkeeping and reporting requirements. The database shall clearly identify the ROWP procurement completed by the County on the Jurisdiction’s behalf under this MOU.
b. The County shall provide the Jurisdiction with the information necessary to report procurement activities in its Electronic Annual Report (EAR) to CalRecycle. This information shall be provided no later than June 1 of each year. c. The County shall provide the Jurisdiction with written status reports twice per year on all CCSP activities.

D. Additional Work
a. With written approval, the County may invoice the Jurisdiction for supplemental contributions to the CCSP, to increase the Jurisdiction’s procurement credit. Such approval shall specify the total funding amount and the portion allocated to program activities and County administrative costs. Jurisdictions are not obliged to support additional work. A Jurisdiction choosing not to support additional work shall not be grounds for terminating this MOU. The Jurisdiction is not guaranteed any benefit from additional work for which it does not contribute. b. With written approval, the County may invoice the Jurisdiction for contributions to additional projects or agreements undertaken on the Jurisdiction’s behalf to increase procurement credit or reduce the Jurisdiction’s procurement target set by CalRecycle. Such approval shall specify the total funding amount and the portion allocated to program activities and County administrative costs.

2. Tasks to be Completed by the Jurisdiction
A. The Jurisdiction shall pay in full all invoices submitted by the County within forty-five (45) days of receipt.

B. The Jurisdiction shall provide the CCSP Authorization Letter to the County by November 1, 2026, and annually thereafter, to authorize its continued participation in the CCSP for the upcoming calendar year. The letter shall specify the total contribution, the anticipated tons of ROWP credit to be received, and the percentage of its contribution that the County will retain to offset program administration costs.

9.g
January 26, 2026 Packet Pg. 245
4 C. The Jurisdiction may authorize participation in the CCSP for one (1) year or for multiple consecutive calendar years, with mutual agreement from the County. A multi-year authorization shall specify the total annual contribution amount for each year covered and shall remain subject to annual adjustment of the County’s administrative cost percentage.

The Jurisdiction may revise or rescind its authorization for any future year by providing written notice to the County no later than November 1 preceding the year for which the change is requested.

D. The Jurisdiction shall be responsible for completing and submitting its EAR to CalRecycle, reporting the information provided by the County.

E. The Jurisdiction shall pay any additional invoices it has approved in writing, within fortyfive (45) days of receipt, for supplemental contributions to the CCSP or for additional projects and agreements undertaken by the County on the Jurisdiction’s behalf.

3. Consideration
This MOU enables the continuation of the collaborative CCSP, jointly developed by the Jurisdiction, County, and RCD since 2021. By participating in this MOU, the Jurisdiction avoids the administrative and financial burden of creating and managing a separate contract or program and allocating staff time, allowing the County on behalf of all the cities in San Mateo County to leverage economies of scale to reduce countywide SB 1383 procurement compliance costs.

In return, the Jurisdiction contributes funding to the CCSP and receives procurement credit in proportion to its contribution. This CCSP advances shared countywide goals by strengthening local food system resiliency, improving soil health, reducing climate impacts, and supporting long-term economic and environmental benefits across San Mateo County.

4. Relationship of Parties
It is expressly understood that this is an agreement between independent entities, the County and the Jurisdiction, and that no individual agency, employee, partnership, joint venture, or other relationship is established by this MOU. The intent of both the County and the Jurisdiction is to create an independent collaborative relationship.

5. Hold Harmless
A. It is agreed that the County shall defend, hold harmless, and indemnify Jurisdiction and its officers, employees, agents, and servants from any and all claims, suits, or actions of every name, kind, and description brought by a third party which arise out of the terms and conditions of this MOU and which result from the acts or omissions of the County and/or its officers, employees, agents, and servants.

B. It is agreed that Jurisdiction shall defend, save, hold harmless, and indemnify the County and its officers, employees, agents, and servants from any and all claims, suits, or actions of every name, kind, and description brought by a third party which arise out of the terms and

9.g
January 26, 2026 Packet Pg. 246
5 conditions of this MOU and which result from the acts or omissions of Jurisdiction and/or their respective officers, employees, agents and servants.

C. County shall defend, hold harmless, and indemnify Jurisdiction from and against any and all claims for wages, salaries, benefits, taxes, and all other withholdings and charges payable to, or in respect to, County’s representatives for services provided under this MOU.

D. Jurisdiction shall defend, hold harmless, and indemnify County from and against any and all claims for wages, salaries, benefits, taxes, and all other withholdings and charges payable to, or in respect to, Jurisdiction’s representatives for services provided under this MOU.

E. The duty of each party to defend, hold harmless, and indemnify the other as set forth herein shall include the duty to defend as set forth in Section 2778 of the California Civil Code.

F. In the event of concurrent negligence (or intentional/reckless acts) of Jurisdiction and/or their respective officers and employees, on the one hand, and the County and/or its officers, employees, agents, and servants, on the other hand, then the liability for any and all claims for injuries or damage to persons and/or property which arise out of the terms and conditions of this MOU shall be apportioned according to the California theory of comparative fault.

6. Amendment of MOU and Merger Clause
This MOU constitutes the sole MOU of the parties hereto and correctly states the rights, duties, and obligations of each party as of this document's date. In the event that any term, condition, provision, requirement or specification set forth in the body of this MOU conflicts with or is inconsistent with any term, condition, provision, requirement, or specification in any exhibit and/or attachment to this MOU, the provisions of this body of the MOU shall prevail. Any prior MOU, promises, negotiations, or representations between the parties not expressly stated in this document are not binding. Either party may request a modification to this MOU at any time. All subsequent modifications shall be in writing and will become effective when signed by all parties.

7. Records
The County shall maintain and preserve all records relating to this MOU in its possession and those of any third-party performing work related to this MOU for a period of five (5) years from the termination of this MOU.

8. Assignability
The County shall have the right to assign this MOU or any portion thereof to a third party or subcontract with a third party to perform any work required under this MOU. The County shall notify the Jurisdiction of any assignments made in advance.

9. Notices
Any written notice, request, demand, or other communication required or permitted hereunder shall be deemed to be properly given when deposited with the United States Postal Service, postage prepaid, or when transmitted by email communication, addressed:

9.g
January 26, 2026 Packet Pg. 247
6 In the case of the County, to:

Jasneet W. Sharma, Director
County of San Mateo Sustainability Department
455 County Center, 4th Floor
Redwood City, CA 94063
Email: [email protected]
In the case of the City of San Carlos , to:

Nil Blackburn, Interim City Manager
600 Elm Street
San Carlos, CA 94070
[email protected]

10. Controlling Law and Venue
The validity of this MOU, the interpretation of its terms and conditions, and the performance of the parties hereto shall be governed by the laws of the State of California. Any action brought to enforce this MOU must be brought in the Superior Court of California in and for the County of San Mateo.

11. Term and Termination
Subject to compliance with the terms and conditions of the MOU, the term of this MOU shall commence on January 31, 2026, and shall be renewed, with written approval by the Jurisdiction, annually under the same terms and conditions. This MOU may be terminated without cause by the Jurisdiction or the County at any time upon thirty (30) days prior written notice to the other party.

12. Electronic Signatures
Both County and the Jurisdiction wish to permit this MOU and future documents relating to this MOU to be digitally signed in accordance with California law and County’s Electronic Signature Administrative Memo. Any party to this MOU may revoke such agreement to permit electronic signatures at any time in relation to all future documents by providing notice pursuant to this Agreement.

13. Authority
The parties warrant that the signatories to the MOU have the authority to bind their respective entities.

IN WITNESS WHEREOF, the parties hereto, by their duly authorized representatives, have affixed their hands.

COUNTY OF SAN MATEO

9.g
January 26, 2026 Packet Pg. 248
7 By:____________________________ Date: __________________________ Jasneet W. Sharma
Director, Sustainability Department

City of San Carlos
By:____________________________ Date: __________________________ Nil Blackburn
Interim City Manager

9.g
January 26, 2026 Packet Pg. 249

CITY COUNCIL

STAFF REPORT
MEETING DATE: January 26, 2026
ITEM TITLE: Adopt a Resolution Approving the Specifications for the Library Building Painting Project (C2519) and Authorizing a Call for Bids.

RECOMMENDATION:

Staff recommend that the City Council adopt a Resolution approving the specifications for the Library Building Painting Project (C2519) (“Project”) and authorizing a call for bids.

FISCAL IMPLICATIONS:

There are no fiscal implications, and no additional funding is needed.

This project is part of the fiscal year (FY) 2025-30 Capital Improvement Program and has an adopted budget amount of $300,000. The engineer’s estimate, with 10% contingency, is approximately $200,000.

BACKGROUND:

The existing San Carlos Library (“Library”) building and parking lots need to be painted due to normal use and aging over time. Repainting will protect the building surfaces from environmental exposure, slow further deterioration, and refresh the overall appearance of the facility.

The scope of work includes repainting the Library foyer and entry areas, including adjacent hallways leading to the restrooms and stairwells, as well as the stairwells themselves. Work also includes repainting the upper-level rotunda area above the entryway and the staff hallway, including walls and structural pillars extending from the top floor to the ceiling.

The Project further includes repainting the lower-level (underground) Library parking lot, including all wall surfaces, structural pillars, bollards, latticework, and other select areas throughout the parking lot, extending up to, but not including the ceiling.

In addition, the Project will repaint the seven existing light poles in the upper-level Library parking lot.

The scope of work includes all necessary surface preparation and painting for the areas described, as well as the application of anti-graffiti coatings in select areas to facilitate future cleaning and maintenance.

9.h
January 26, 2026 Packet Pg. 250
Staff retained S.R. Rose Engineering, Inc. (“Consultant”) to prepare the construction specifications. The specifications are now complete to the satisfaction of the City Engineer.

Staff and the Consultant collaborated during the preparation of the construction documents to ensure the improvements meet the needs of City staff and users.

ANALYSIS:

The final bid set construction documents were signed by the City Engineer on January 13, 2026.

The tentative bid opening date is February 17, 2026, at 10:30 a.m. with the Project tentatively scheduled to be awarded at the March 9, 2026 City Council meeting.

Staff recommend approving the specifications and authorizing a call for bids for the Project.

ALTERNATIVES:

The alternatives available to the City Council include:

1. Adopt a Resolution approving the specifications for the Library Building Painting Project (C2519) and authorizing a call for bids; or

2. Do not adopt the Resolution; or

3. Provide staff with alternative direction.

Respectfully submitted by:

Steven Machida, Public Works Director
Approved for submission by:
____________________________
Nil Blackburn, Interim City Manager
ATTACHMENT(S):

1. Resolution

2. Project C2519 Specifications

9.h
January 26, 2026 Packet Pg. 251
RESOLUTION NO. 2026 – ____

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SAN CARLOS

APPROVING THE SPECIFICATIONS FOR THE LIBRARY BUILDING PAINTING PROJECT (C2519) AND AUTHORIZING A CALL FOR BIDS.

WHEREAS, the existing San Carlos Library (“Library”) building and parking lots need to be painted due to normal use and aging over time; and
WHEREAS, repainting will protect the building surfaces from environmental exposure, slow further deterioration, and refresh the overall appearance of the facility; and WHEREAS, the Library Building Painting Project (C2519) (“Project”) includes repainting the Library foyer and entry areas, including adjacent hallways leading to the restrooms and stairwells, as well as the stairwells themselves, and repainting the upper-level rotunda area above the entryway and the staff hallway, including walls and structural pillars; and WHEREAS, the Project further includes repainting the lower-level underground Library parking lot, including wall surfaces, structural pillars, bollards, latticework, and other select areas up to, but not including, the ceiling; repainting seven existing light poles in the upper-level Library parking lot; and performing all necessary surface preparation and applying anti-graffiti coatings in select areas; and
WHEREAS, staff retained S.R. Rose Engineering, Inc. (“Consultant”) to prepare the construction specifications. The specifications are now complete to the satisfaction of the City Engineer; and
WHEREAS, staff and the Consultant collaborated during the preparation of construction documents to ensure the improvements meet the needs of City staff and users; and WHEREAS, the final bid set construction documents were prepared and signed by the City Engineer on January 13, 2026; and
WHEREAS, the tentative bid opening date is February 17, 2026 at 10:30 a.m. with the Project tentatively scheduled to be awarded at the March 9, 2026 City Council meeting; and WHEREAS, staff recommend approving the specifications and authorizing a call for bids for the Project.

NOW, THEREFORE BE IT RESOLVED, that the San Carlos City Council hereby approves the specifications for the Library Building Painting Project (C2519) and authorizes a call for bids.
* * * * *
I, City Clerk Crystal Mui, hereby certify that the foregoing Resolution was duly and regularly passed and adopted by the City Council of the City of San Carlos at a scheduled meeting thereof held on the 26th day of January 2026, by the following vote:

9.h
January 26, 2026 Packet Pg. 252
________________________________
CITY CLERK of the City of San Carlos
APPROVED:
___________________________
MAYOR of the City of San Carlos
AYES, COUNCILMEMBERS:

NOES, COUNCILMEMBERS:

ABSENT, COUNCILMEMBERS:

9.h
January 26, 2026 Packet Pg. 253

CITY OF SAN CARLOS

SAN MATEO COUNTY, CALIFORNIA
Public Works Department
600 Elm Street
San Carlos, CA 94070
Contract Documents
For the
Library Building Painting Project
City Project No. C2519

BID OPENING: Tuesday, February 17, 2026 at 10:30 a.m.

MANDATORY PRE-BID JOB WALK: Wednesday, February 4, 2026 at 11:00 a.m.

BID SET

9.h
January 26, 2026 Packet Pg. 254
This Page Intentionally Left Blank

9.h
January 26, 2026 Packet Pg. 255
Library Building Painting Project
City Project No. C2519

DESIGN CERTIFICATION
The Plans and Technical Specifications contained herein have been prepared by, or under the responsible charge of, the following registered person(s):

Prepared by:
___________________________________________________________ SEAN ROSE, P.E., PROJECT MANAGER Date
S.R. Rose Engineering Inc.
15751 Kavin Ln
Los Gatos, CA 95030
(650) 400-1462
Approved for Construction:
___________________________________________________________ GRACE LE, P.E., CITY ENGINEER Date
Public Works Department
City of San Carlos
600 Elm Street, San Carlos, CA 94070
(650) 802-4201
1/9/2026
1/13/2026

9.h
January 26, 2026 Packet Pg. 256
This Page Intentionally Left Blank

9.h
January 26, 2026 Packet Pg. 257

TABLE OF CONTENTS
A. INTRODUCTORY PAGES
Title Page No.

Cover Page i
Design Certification iii
Table of Contents v
Notice Inviting Sealed Proposals vii
Instructions to Bidders ix
Schedule of Required Bid Documents and Agreement Forms xi B. BID PROPOSAL
Bid Proposal Cover Page P-1
Bid Proposal Table of Contents P-2
Bid Proposal P-3
Bidding Requirements P-4
Bid Schedule P-6
Designation of Subcontractors P-8
Department of Industrial Relations Registration Requirement P-9 Certifications and Affidavits
Non-Collusion Affidavit P-10
Bidder’s Qualifications P-11
Bidder’s References P-12
Signature Pages P-13
Bidder’s Bond P-15
C. AGREEMENT AND AGREEMENT FORMS
Agreement and Agreement Forms Table of Contents A-1
Public Project Agreement A-2
Exhibit A – Contractor’s Bid Proposal A-12
Exhibit B – Insurance Coverage Form A-13
Resolution of Construction Claims A-14
Agreement Forms
Payment Bond A-16
Performance Bond A-18
Workers Compensation Certification A-20
Certification of Safety Requirements for Contractors and Vendors A-21 Drug-Free Workplace Certification A-22
Escrow Agreement for Security Deposits in Lieu of Retention (Optional) A-23 Guarantee A-25
D. GENERAL PROVISIONS
Section 1 Terms and Definitions GP-1
Section 2 Proposal Requirements and Conditions GP-6
Section 3 Review of Bids, Contract Award and Execution GP-9 Section 4 Scope and Control of the Work GP-14
Section 5 Changes of Work GP-21
Section 6 Control of Materials GP-26
Section 7 Utilities GP-29
Section 8 Prosecution and Progress GP-32
Section 9 Responsibilities of the Contractor GP-41
Section 10 Measurement and Payment GP-56
Section 11 Guarantee GP-62

9.h
January 26, 2026 Packet Pg. 258
E. BID ITEM DESCRIPTIONS
General BD-3
Measurement and Payment BD-4
F. SPECIAL PROVISIONS
Section 1 Description of Work SP-1
Section 2 Location SP-1
Section 3 Days and Hours of Operation SP-1
Section 4 Staging/Construction Area SP-1
Section 5 Water SP-1
Section 6 Power SP-1
Section 7 Owner/Contractor meetings SP-2
Section 8 Notification of Residents and Merchants SP-2
Section 9 Storm Water Pollution Prevention SP-3
Section 10 Construction and Demolition Debris SP-3
Section 11 Haul Routes SP-3
Section 12 Sanitation Facilities and Utilities SP-3
Section 13 Sequence of Work SP-3
Section 14 Clearance Heights SP-4
Section 15 Safety of Persons and Property SP-4
Section 16 Traffic Control SP-5
Section 17 Construction Schedule SP-6
Section 18 Daily Work Reports SP-6
Section 19 Submittals SP-7
Section 20 Sweeping SP-7
G. TECHNICAL PROVISIONS
Section 010000
Section 099000
Anti-Graffiti Coating
Painting and Finishing
TP-3
TP-12

H. APPENDICES
Appendix A Daily Work Report

9.h
January 26, 2026 Packet Pg. 259
If you require translation for this notice, please contact the City Clerk’s Office at 650-802-4222.

CITY OF SAN CARLOS

SAN MATEO COUNTY, CALIFORNIA

NOTICE INVITING SEALED PROPOSALS
NOTICE IS HEREBY GIVEN that sealed proposals or bids for the Library Building Painting Project, No.

C2519 shall be publicly opened, examined and announced on Tuesday, February 17, 2026 at 10:30 a.m. at the San Carlos City Clerk’s Office at City Hall – 600 Elm Street, San Carlos, CA 94070. Sealed bid proposals shall be received in-hand by the City Clerk before the bid opening date and time. A mandatory pre-bid meeting has been scheduled for this project on Wednesday, February 4, 2026 at 11:00 a.m., in front of the San Carlos Library.

A Class C-33, Painting and Decorating Contractor’s License is required for this work. Contractors bidding with a Class-B Contractor’s License will be deemed non-responsible and non-responsive. Work will be done and payments will be made in accordance with provisions more particularly described in the plans and specifications. The Engineer’s Estimate is between $150,000 and $200,000.

Scope of Work. The scope of work generally includes repainting the walls, including handrails and other appurtenances, of the Main-Level Foyer and Entry areas of the San Carlos Library, including the adjacent hallways leading to the stairwells and bathrooms, and the stairwells themselves. Additionally, the project includes repainting the walls, including any handrails and other appurtenances, of the Library’s Upper-Level Rotunda area above the main entryway, including the structural pillars extending from the top floor to the ceiling, but excluding the circular feature, and the adjacent staff hallway. The project also includes repainting and anti-graffiti coating of all wall surfaces, structural pillars, bollards, metal grates and latticework in the Library’s Lower-Level underground parking lot. Includes the elevator lobby area at the bottom of the stairwell, the Police entrance aisle, and the Chestnut Avenue stairway. Additionally, the project includes repainting and anti-graffiti coating of seven (7) existing light poles in the Upper-Level above ground Library parking lot.

← All documents from this meeting