Cities Index.
Agenda packet

San Luis Obispo City Council
February 18, 2025

Document
Agenda packet
Meeting
February 18, 2025
Body
San Luis Obispo City Council
Pages
504
Original file
81.5 MB
Text extracted from the city's file for reading and search. Open the original on pub-slocity.escribemeetings.com. That file is the official record.

ID Task Name Duration Start
188 Create Basemap of Record R/W 10 days Wed 11/27/24
189 Control Survey Densification 1 day Wed 12/11/24
190 Field Locate Record Monumentation 5 days Thu 12/12/24 191 Least Square Adjustment of Field Located
Monumentation
3 days Thu 12/19/24
192 Best Fit Field Located Monumentation to Record
Maps
5 days Tue 12/24/24
193 Supplemental Field Surveying 15 days Thu 2/20/25
194 Conform Surveys 15 days Thu 2/20/25
195 Drainage System Surveys 15 days Thu 2/20/25
196 San Luis Obispo Creek Channel Cross Sections 15 days Thu 2/20/25 197 Building Finish Floor Elevation Data Collection 15 days Thu 2/20/25 198 Topographic Feature Data Collection 15 days Thu 2/20/25 199 Design Technical Reports 484 days Fri 11/15/24
200 Geotechnical Design and Materials Report (PGDR) 435 days Thu 1/16/25 201 Prepare Draft PGDR 4 wks Thu 1/16/25
202 Consor Review 1 wk Thu 2/13/25
203 Update PGDR 4 wks Thu 2/20/25
204 Draft Report 2 wks Thu 3/20/25
205 City Review 1 wk Thu 4/3/25
206 Update Draft Report 1 wk Thu 4/10/25
207 Caltrans/City Review 4 wks Thu 4/17/25
208 Respond to comments 1 wk Thu 5/15/25
209 Final Report 2 wks Thu 9/3/26
210 Draft Structure Preliminary Geotechnical Report (SPGR) 435 days Thu 1/16/25 211 Prepare Draft SPGR 4 wks Thu 1/16/25
212 Consor Review 1 wk Thu 2/13/25
213 Update PGDR 2 wks Thu 2/20/25
214 Draft Report 2 wks Thu 3/6/25
215 City Review 2 wks Thu 3/20/25
216 Update Draft Report 2 wks Thu 4/3/25
217 Caltrans/City Review 4 wks Thu 4/17/25
218 Respond to comments 2 wks Thu 5/15/25
219 Final Report 4 wks Thu 8/20/26
220 Updated Location Hydraulic Study 435 days Thu 1/16/25 221 Develop Draft LHS 8 wks Thu 1/16/25
222 Consor Review 1 wk Thu 3/13/25
223 Admin Draft 2 wks Thu 3/20/25
224 City Review 2 wks Thu 4/3/25
225 Update Draft LHS 2 wks Thu 4/17/25
226 Caltrans/City Review 4 wks Thu 5/1/25
227 1ST Round Response to comments 1 wk Thu 5/29/25
228 Submit updated LHS 4 wks Thu 6/5/25
229 Caltrans/City Review 2 wks Thu 7/3/25
230 2ND Round Response to Comments 1 wk Thu 7/17/25
231 Final LHS 4 wks Thu 8/20/26
232 Drainage Impact Study Report 435 days Thu 1/16/25
233 Develop Draft Report 8 wks Thu 1/16/25
234 Consor Review 4 wks Thu 3/13/25
235 Admin Draft 4 wks Thu 4/10/25
236 City Review 4 wks Thu 5/8/25
237 Update Draft Report 4 wks Thu 6/5/25
238 Caltrans/City Review 4 wks Thu 7/3/25
239 Final Report 4 wks Thu 8/20/26
240 Preliminary Floodplain and Bridge Design Hydraulic
Study
435 days Thu 1/16/25
241 Develop Draft Study 4 wks Thu 1/16/25
242 Consor Review 1 wk Thu 2/13/25
243 Admin Draft 2 wks Thu 2/20/25
244 City Review 2 wks Thu 3/6/25
245 Update Draft Study 2 wks Thu 3/20/25
246 Caltrans/City Review 4 wks Thu 4/3/25
247 1ST Round Response to comments 2 wks Thu 5/1/25
248 Submit updated Study 2 wks Thu 5/15/25
249 Caltrans/City Review 2 wks Thu 5/29/25
250 2ND Round Response to Comments 2 wks Thu 6/12/25
251 Final Study 2 wks Thu 9/3/26
252 Preliminary Storm Water Data Report 435 days Thu 1/16/25 253 Develop Draft Report 4 wks Thu 1/16/25
254 Consor Review 1 wk Thu 2/13/25
255 Admin Draft 2 wks Thu 2/20/25
256 City Review 2 wks Thu 3/6/25
257 Update Draft Report 2 wks Thu 3/20/25
258 Caltrans/City Review 4 wks Thu 4/3/25
259 Final Report 2 wks Thu 9/3/26
260 Water Quality Assessment Report 435 days Thu 1/16/25

JSNJMMJSNJMMJS
Half 2, 2024 Half 1, 2025 Half 2, 2025 Half 1, 2026 Half 2, 2026

Page 2 ends

ID Task Name Duration Start
261 Develop Draft Report 4 wks Thu 1/16/25
262 Consor Review 4 wks Thu 2/13/25
263 Admin Draft 4 wks Thu 3/13/25
264 City Review 4 wks Thu 4/10/25
265 Update Draft Report 4 wks Thu 5/8/25
266 Caltrans/City Review 4 wks Thu 6/5/25
267 Final Report 4 wks Thu 8/20/26
268 Right of Way Needs Determination 40 days Thu 1/16/25 269 Preliminary ROW Assessment 4 wks Thu 1/16/25
270 Develop ROW Parcel Needs Spreadsheet 4 wks Thu 2/13/25 271 Right of Way Estimating/Right of Way Data Sheet for Perferred Alternative
395 days Wed 3/12/25
272 Receive ROW Needs Mapping from Consor 0 wks Wed 3/12/25 273 Preparation of ROW Data Sheet 4 wks Thu 3/13/25
274 Admin Draft 1 wk Thu 4/10/25
275 City Review 2 wks Thu 4/17/25
276 Update Draft Data Sheet 1 wk Thu 5/1/25
277 Caltrans/City Review 2 wks Thu 5/8/25
278 Respond to comments 1 wk Thu 5/22/25
279 Final Data Sheet 1 wk Thu 9/10/26
280 Environmental Permit and Monitoring Memorandum
(EPMM)
435 days Thu 1/16/25
281 Develop Draft EPMM 4 wks Thu 1/16/25
282 Consor Review 1 wk Thu 2/13/25
283 Admin Draft Memo 1 wk Thu 2/20/25
284 City Review 1 wk Thu 2/27/25
285 Update Draft Memo 1 wk Thu 3/6/25
286 Caltrans/City Review 4 wks Thu 3/13/25
287 Respond to comments 1 wk Thu 4/10/25
288 Final Memo 1 wk Thu 9/10/26
289 Value Analysis Report 105 days Thu 11/21/24
290 Initial Alternative 3A Roll Map & APS 4 wks Thu 11/21/24 291 Meeting 2 Material Development - Conceptual Roll
Map with APS for 2 Concepts
3 wks Thu 12/19/24
292 Meeting 3 Material Development - Refinement of
Conceptual Roll Map and APS for 2 Concepts
2 wks Thu 1/9/25
293 Design Charrettes 25 days Wed 12/18/24
294 DC #1 - Alternative 3A Focus 0 days Wed 12/18/24
295 DC #2 - 2 Concept Plans & Bridge APS Focus 0 days Wed 1/8/25 296 DC #3 - Refinement of Concept Plans & Bridge APS -
Focus on Preferred Concept
0 days Wed 1/22/25
297 Admin Draft VA Report 4 wks Thu 1/23/25
298 City Review 1 wk Thu 2/20/25
299 Update Draft VA Report 2 wks Thu 2/27/25
300 Caltrans/City Review 2 wks Thu 3/13/25
301 Respond to comments 2 wks Thu 3/27/25
302 Final VA Report 1 wk Thu 4/10/25
303 LEED/Envision Memo of Feasibility 370 days Thu 4/17/25 304 Develop Draft Memo 4 wks Thu 4/17/25
305 Consor Review 4 wks Thu 5/15/25
306 Admin Draft 4 wks Thu 6/12/25
307 City Review 4 wks Thu 7/10/25
308 Update Draft Memo 4 wks Thu 8/7/25
309 City Review 4 wks Thu 9/4/25
310 Final Draft Memo 4 wks Thu 8/20/26
311 Sustainability Memo 370 days Thu 4/17/25
312 Develop Draft Memo 4 wks Thu 4/17/25
313 Consor Review 4 wks Thu 5/15/25
314 Admin Draft 4 wks Thu 6/12/25
315 City Review 4 wks Thu 7/10/25
316 Update Draft Memo 4 wks Thu 8/7/25
317 City Review 4 wks Thu 9/4/25
318 Final Draft Memo 4 wks Thu 8/20/26
319 Schematic Aesthetic Development 370 days Thu 4/17/25 320 Develop 3 Concept Alternatives 10 wks Thu 4/17/25
321 Virtual Meeting #1 With Caltrans/City 0 wks Wed 6/25/25 322 Refine Concepts 4 wks Thu 6/26/25
323 Admin Draft Aesthetics Report 4 wks Thu 6/26/25
324 City Review 2 wks Thu 7/24/25
325 Virtual Meeting #2 With Caltrans/City 0 wks Wed 8/6/25 326 Refine Concepts 4 wks Thu 8/7/25
327 Draft Aesthetics Report 4 wks Thu 8/7/25
328 Caltrans/City Review 4 wks Thu 9/4/25
329 Update Report 2 wks Thu 10/2/25
330 Public Meeting 0 days Wed 10/15/25
331 Final Draft Aesthetics Report 4 wks Thu 8/20/26
332 Bridge Type Selection 195 days Thu 4/17/25
333 As-Built Review and Assessment 1 wk Thu 4/17/25
334 Pre-Type Selection Submittal to OSFP 85 days Thu 5/8/25 3/12 Receive ROW Needs Mapping from Consor
12/18 DC #1 - Alternative 3A Focus
1/8 DC #2 - 2 Concept Plans & Bridge APS Focus
1/22 DC #3 - Refinement of Concept Plans & Bridge APS - Focus on Preferred Concept 6/25 Virtual Meeting #1 With Caltrans/City
8/6 Virtual Meeting #2 With Caltrans/City
10/15 Public Meeting

J S N J M M J S N J M M J S
Half 2, 2024 Half 1, 2025 Half 2, 2025 Half 1, 2026 Half 2, 2026

Page 3 ends

ID Task Name Duration Start
335 Bridge Site Data Submittal Package 4 wks Thu 5/8/25 336 Foundation Boring Plan 4 wks Thu 5/29/25
337 Draft Bridge Design Hydraulics Report 4 wks Thu 6/12/25 338 Submit to Caltrans OSFP 0 days Wed 8/6/25
339 OSFP Review and Comment 4 wks Thu 8/7/25
340 Draft Type Selection Report 140 days Thu 6/5/25
341 Develop GP & Foundation Plan 3-Bridges 6 wks Thu 6/5/25 342 Develop GP & Foundation Plan Retaining
Structures
4 wks Thu 6/5/25
343 Develop GP Estimates 4 wks Thu 7/17/25
344 Draft Type Selection Report 8 wks Thu 8/14/25
345 City Review 2 wks Thu 10/9/25
346 Incorporate Comments 4 wks Thu 10/23/25
347 Submit Draft TSR to Caltrans 0 days Wed 11/19/25
348 Type Selection Meeting 4 wks Thu 11/20/25
349 Update TSR and Incorporate Comments 4 wks Thu 12/18/25 350 Submit Final TSR to Caltrans 0 wks Wed 1/14/26
351 Preliminary Assessment - Design Standard Decision
Dcoumentation
320 days Thu 7/3/25
352 DIB 78 1 wk Thu 7/3/25
353 DSDD Assessment Table 1 wk Thu 7/3/25
354 Conceptual Concurrence on DSDD Types 1 wk Thu 9/17/26 355 Utility Coordination 60 days Fri 11/15/24
356 Conflict Identification - Utility A Letter 4 wks Fri 11/15/24 357 Receive Facility Maps and Update Base Map 8 wks Fri 12/13/24 358 50% Submittal 475 days Thu 11/21/24
359 Develop Preliminary Geometric Plan and Constraints
Assessment
8 wks Thu 11/21/24
360 Draft Plan Package Development 370 days Thu 4/17/25 361 Roadway Plans 60 days Thu 4/17/25
362 Roadway plans 12 wks Thu 4/17/25
363 Preliminary Signal & Lighting Plans 8 wks Thu 5/15/25 364 Preliminary Landscape Concept Plans 8 wks Thu 5/15/25 365 Preliminary Drainage Concept Plans 8 wks Thu 5/15/25 366 Preliminary Traffic Handling/Stage Construction
Plans
8 wks Thu 5/15/25
367 Preliminary Right of Way 8 wks Thu 5/15/25
368 Preliminary Wet Utility Plans 8 wks Thu 5/15/25
369 Structure Plans 40 days Thu 1/15/26
370 Prado Road Mainline Bridge Plans 8 wks Thu 1/15/26
371 Prado Road/US 101 Offramp Bridge Plans 8 wks Thu 1/15/26 372 Prado Road/US 101 Onramp Bridge Plans 8 wks Thu 1/15/26 373 Preliminary Engineers Estimate 3 wks Thu 3/12/26
374 Internal QA/QC 2 wks Thu 4/2/26
375 Draft Plan Package Assembled 3 wks Thu 4/16/26
376 City Review/3rd Party Review 3 wks Thu 5/7/26
377 Update Plans & Response to Comments 4 wks Thu 5/28/26 378 Submit Draft Final Plans 0 days Wed 6/24/26
379 Caltrans/City Review 4 wks Thu 6/25/26
380 Update Plans & Response to Comments 4 wks Thu 7/23/26 381 Submit Final Draft Plans 0 days Wed 8/19/26
382 Caltrans/City Review 4 wks Thu 8/20/26
383 NEXT STEPS 55 days Thu 9/17/26
384 Scoping Document Summarizing Conceptual Phase and
Recommendations
3 wks Thu 9/17/26
385 Simplified Proposal for PHASE II WORK PLAN 3 wks Thu 9/17/26 386 City Approval of Phase II Work Plan 8 wks Thu 10/8/26 387 PHASE II WORK PLAN 705 days Wed 12/2/26
388 Phase II NTP 0 days Wed 12/2/26
389 General Project Management 19 mons Thu 12/3/26
390 Project Management Plan 704 days Thu 12/3/26
391 QMP 3 wks Thu 12/3/26
392 Risk Management Plan 630 days Wed 3/17/27
423 Schedule Management 630 days Wed 3/17/27
454 PDT MEETINGS 630 days Wed 2/10/27
485 Project Technical Focus Virtual Meetings (15) 560 days Wed 3/17/27 501 Grant Application Assistance 80 days Thu 12/3/26
502 Yearly Report of Grant Opportunities 8 wks Thu 12/3/26 503 Grant Application Assistance 8 wks Thu 1/28/27
504 Advisory Body Assistance (ARC, PC, others) 456 days Fri 5/7/27 505 4- Meetings in Person as Technical Support 325 days Wed 5/12/27 510 Lead 8-Prep Meetings with City Staff 456 days Fri 5/7/27 519 Public Outreach 576 days Thu 12/3/26
520 Develop Project Fact Sheet 8 wks Thu 12/3/26
521 Pubilc Meeting Near 90% 0 wks Wed 12/29/27
522 Outreach Efforts 522 days Wed 2/17/27
523 Residences/Businesses in Project Area 3 wks Thu 12/2/27 524 Mass Mailer #1 3 wks Thu 12/2/27
525 Mass Mailer #2 3 wks Thu 6/8/28
8/6 Submit to Caltrans OSFP
11/19 Submit Draft TSR to Caltrans
1/14 Submit Final TSR to Caltrans
6/24 Submit Draft Final Plans
8/19 Submit Final Dr
12/

J S N J M M J S N J M M J S
Half 2, 2024 Half 1, 2025 Half 2, 2025 Half 1, 2026 Half 2, 2026

Page 4 ends

ID Task Name Duration Start
526 8-Press Releases 455 days Fri 5/21/27
535 City Webpage Monthly Updates 500 days Fri 3/5/27
560 Collateral Materials for 8-Events 455 days Wed 2/17/27 569 Public Meeting 10 days Wed 7/19/28
570 1-Meeting Post 90% 0 wks Wed 7/19/28
571 Meeting Minutes, Comment Matrix, Capture Proposed
Changes to Address Public Comments
2 wks Thu 7/20/28
572 Next Steps 55 days Thu 12/21/28
573 Scoping Narrative Documentation for Design Decisions and Reasoning
3 wks Thu 12/21/28
574 Simplified Proposal for Phase III Work Plan 3 wks Thu 12/21/28 575 City Authorization for Phase III Work Plan 8 wks Thu 1/11/29 576 UTILITY COORDINATION 280 days Thu 12/3/26
577 Coordination Meetings with Utilities 140 days Thu 12/3/26 578 Field Meeting #1 0 days Wed 12/16/26
579 Field Meeting #2 0 days Wed 6/16/27
580 Virtual Meeting #1 0 days Thu 12/3/26
581 Virtual Meeting #2 0 days Thu 6/3/27
582 Determine ROW Needs for Utilities 15 days Thu 12/9/27 583 Confirm ROW Needs for Utilities 3 wks Thu 12/9/27
584 Pothole Exhibits to City Polholing Vendor 3 wks Thu 12/9/27 585 Utility B Letters 8 wks Thu 12/3/26
586 Develop Caltrans Utility Reports of Investigation 160 days Thu 1/28/27 587 Confirm Liability Determination 8 wks Thu 1/28/27
588 Assemble Prior Rights Documentation & Review of
Prelim Title Reports
8 wks Thu 1/28/27
589 Draft Utility Agreements 8 wks Thu 1/28/27
590 Draft Notice to Owners 4 wks Thu 1/28/27
591 Assemble Complete ROI Packages For Each Utility 8 wks Thu 3/25/27 592 City Review of ROI Package 4 wks Thu 5/20/27
593 Update ROI Package 4 wks Thu 6/17/27
594 Caltrans/City Review of ROI Submittal 4 wks Thu 7/15/27 595 Final ROI Package 4 wks Thu 8/12/27
596 Contirm Utility Relocation Needs and Review of Utility Relocation Plan
8 wks Thu 1/28/27
597 Utility C Letters 8 wks Thu 9/9/27
598 ROW COORDINATION 350 days Thu 2/25/27
599 Finalize ROW Map for Proposed Takes and Utility Needs 8 wks Thu 2/25/27 600 Right of Way Engineering 140 days Thu 2/25/27
601 Caltrans Appraisal Map 8 wks Thu 2/25/27
602 Caltrans Review of Appraisal Map 4 wks Thu 4/22/27
603 Plats & Legal Descriptions 4 wks Thu 5/20/27
604 Caltrans/City Review 4 wks Thu 6/17/27
605 Final Plats & Legals 4 wks Thu 7/15/27
606 Coordination with ROW Acquisition Agent 4 wks Thu 8/12/27 607 Right of Way Appraisals 80 days Thu 6/17/27
608 Prepare Appraisals 8 wks Thu 6/17/27
609 Caltrans/City Review 4 wks Thu 8/12/27
610 Update Appraisal 4 wks Thu 9/9/27
611 Right of Way Acquisitions 190 days Thu 10/7/27
612 Issue First Written Offer 4 wks Thu 10/7/27
613 Property Owner Negoiations 4 wks Thu 11/4/27
614 Finalize acquistions 26 wks Thu 12/2/27
615 Draft Right of Way of Certification 4 wks Thu 6/1/28 616 65% PS&E 265 days Thu 12/3/26
617 Prepare Draft Plans 200 days Thu 12/3/26
618 Roadway Plans 60 days Thu 12/3/26
619 Roadway plans 12 wks Thu 12/3/26
620 Signal & Lighting Plans 8 wks Thu 12/31/26
621 Landscape Concept Plans 8 wks Thu 12/31/26
622 Drainage Concept Plans 8 wks Thu 12/31/26
623 Traffic Handling/Stage Construction Plans 8 wks Thu 12/31/26 624 Confirm Right of Way 8 wks Thu 12/31/26
625 Wet Utility Plans 8 wks Thu 12/31/26
626 Bridge Design 40 days Thu 12/24/26
627 Prado Road Mainline Bridge Plans 8 wks Thu 12/24/26 628 Prado Road/US 101 Offramp Bridge Plans 8 wks Thu 12/24/26 629 Prado Road/US 101 Onramp Bridge Plans 8 wks Thu 12/24/26 630 Final Aesthetic Development 125 days Thu 2/18/27
631 Develop Admin Draft Plan 4 wks Thu 2/18/27
632 Consor Review and Update 1 wk Thu 3/18/27
633 Submit Admin draft 0 wks Wed 3/24/27
634 City Review 2 wks Thu 3/25/27
635 Update Draft 4 wks Thu 4/8/27
636 Draft Review Caltrans/City 4 wks Thu 5/6/27
637 1ST Round Response to Comments 2 wks Thu 6/3/27
638 Submit Updated Draft 0 wks Wed 6/16/27
12 12/

JSNJMMJSNJMMJS
Half 2, 2024 Half 1, 2025 Half 2, 2025 Half 1, 2026 Half 2, 2026

Page 5 ends

ID Task Name Duration Start
639 Caltrans/City Review 4 wks Thu 6/17/27
640 2ND Round Response to Comments 2 wks Thu 7/15/27
641 Final Aesthetic Plan 2 wks Thu 7/29/27
642 Assemble Draft Plans 4 wks Thu 8/12/27
643 Design Standards Decision Document 4 wks Thu 8/12/27 644 Utility Encroachment Variance Request If Needed 4 wks Thu 8/12/27 645 Prepare Draft Quantities and Estimate 4 wks Thu 9/9/27 646 Prepare Draft Special Provisions 4 wks Thu 9/9/27
647 Internal QA/QC 2 wks Thu 10/7/27
648 City Review 1 wk Thu 10/21/27
649 Update Plans 2 wks Thu 10/28/27
650 Submit 65% PS&E to District 0 days Wed 11/10/27
651 Submit 65% PS&E to Structures 0 days Wed 11/10/27
652 Independent Check 4 wks Thu 11/11/27
653 65% Constructability Review 4 wks Thu 11/11/27
654 Caltrans Functional Unit Review and Structures
Review
4 wks Thu 11/11/27
655 90% PS&E 160 days Thu 12/9/27
656 Comment Resolution Documentation 65% Reviews
and incorporate comments
4 wks Thu 12/9/27
657 Update PS&E 8 wks Thu 1/6/28
658 Final Plan Package 4 wks Thu 3/2/28
659 Final Estimate 2 wks Thu 3/30/28
660 Final Specifications 2 wks Thu 3/30/28
661 Internal QA/QC 2 wks Thu 4/13/28
662 Update Package 4 wks Thu 4/27/28
663 City Review/3rd Party Review 2 wks Thu 5/25/28
664 Update Plans 2 wks Thu 6/8/28
665 Submit 90% PS&E to District 0 days Wed 6/21/28
666 Submit 90% PS&E to Structures 0 days Wed 6/21/28
667 District Functional Unit Reviews, Safety Review,
Constructability Review
4 wks Thu 6/22/28
668 Structures Review 4 wks Thu 6/22/28
669 100% PS&E 110 days Thu 7/20/28
670 Comment Resolution Documentation 95% Reviews
and incorporate comments
2 wks Thu 7/20/28
671 Update PS&E 4 wks Thu 8/3/28
672 Final Plan Package 4 wks Thu 8/31/28
673 Final Estimate 2 wks Thu 9/28/28
674 Final Specifications 2 wks Thu 9/28/28
675 Internal QA/QC 2 wks Thu 10/12/28
676 City Review 2 wks Thu 10/26/28
677 Update Plans 2 wks Thu 11/9/28
678 Submit 100% PS&E to District 0 days Wed 11/22/28
679 Submit 100% PS&E to Structures 0 days Wed 11/22/28
680 District Functional Unit Reviews 4 wks Thu 11/23/28 681 Structures Review 4 wks Thu 11/23/28
682 Final PS&E 110 days Thu 12/21/28
683 Comment Resolution Documentation 100% Reviews 2 wks Thu 12/21/28 684 Update PS&E 4 wks Thu 1/4/29
685 Final Plan Package 2 wks Thu 2/1/29
686 Final Estimate 2 wks Thu 2/1/29
687 Final Specifications 2 wks Thu 2/1/29
688 Internal QA/QC 2 wks Thu 2/15/29
689 RE Pending File 2 wks Thu 3/1/29
690 Geotechnical Information Handout 2 wks Thu 3/1/29
691 Materials Informaiton Handout 2 wks Thu 3/1/29
692 Design Cross Sections and Staking Notes 2 wks Thu 3/1/29 693 Right of Way Certification 2 wks Thu 3/1/29
694 Assemble Final PS&E Package 2 wks Thu 3/15/29
695 Submit Final PS&E 0 wks Wed 3/28/29
696 Caltrans/City Review 4 wks Thu 3/29/29
697 Update Pacakage 2 wks Thu 4/26/29
698 Assemble Final Advertise Ready Package 2 wks Thu 4/26/29 699 Caltrans Approval of Encroachment Permit to
Construct
2 wks Thu 5/10/29
700 City Advertise Project 8 wks Thu 5/24/29
701 City Award Project 4 wks Thu 7/19/29

J S N J M M J S N J M M J S
Half 2, 2024 Half 1, 2025 Half 2, 2025 Half 1, 2026 Half 2, 2026

Page 6 ends

Conflict of Interest
Conflict of Interest
US 101/Prado Road Interchange • City of San Luis Obispo • July 2024 • 108 Conflict of Interest Statement
Consor does not have any financial, business, or other relationship with the City of San Luis Obispo that may have an impact upon the outcome of this project. Consor does not have any clients who have a financial interest in the outcome of this consultant services agreement. Consor will be able to comply with the requirements of the City’s Conflict of Interest Statement during the duration of this project.

Local Presence
Local Presence
US 101/Prado Road Interchange • City of San Luis Obispo • July 2024 • 109 Local Presence
Consor has an established office in the City of San Luis Obispo.

Our office location is:
364 Pacific Street, 1st Floor
San Luis Obispo, CA 93401
References
References
US 101/Prado Road Interchange • City of San Luis Obispo • July 2024 • 110 References

COUNTY OF EL DORADO
Matt Smeltzer, Deputy Director of Engineering
E: [email protected]
P: 530.621.5912

MERCED COUNTY DEPARTMENT OF PUBLIC WORKS
Nathan Bray, Public Works Director
E: [email protected]
P: 209.385.7601
Consor has experience completing feasibility studies, preliminary studies, PS&Es, and other technical documents needed to take this project from concept to construction. Our expertise and success with public outreach as well as designing and supporting construction of interchanges can give the City confidence that the Consor team can provide a PS&E that accurately and comprehensively considers trade-offs for alternatives and impacts to the public. We are eager to partner with the City of San Luis Obispo to help make the US 101/Prado Road Interchange a reality. Below are three references from recent similar projects that will give the City a sense of what it is like to work with our team.

Project: US 50 HOV/LATROBE ROAD/EL DORADO HILLS BOULEVARD

INTERCHANGE IMPROVEMENTS PHASED PROJECTS
Project: ATWATER-MERCED EXPRESSWAY PHASE 1B

CONTRA COSTA TRANSPORTATION AUTHORITY
Ivan Ramirez
E: [email protected]
P: 925.256.4737
Project: SR-4/BALFOUR ROAD INTERCHANGE
Exceptions to Standard Agreement
Exceptions to
Standard Agreement
US 101/Prado Road Interchange • City of San Luis Obispo • July 2024 • 111 Exceptions to the Standard Agreement
Consor respectfully requests the City consider the following revisions to the Standard Agreement. Requested revisions are indicated by red font.

25. Hold Harmless and Indemnification.

To the fullest extent permitted by law (including, but not limited to California Civil Code Sections 2782 and 2782.8), Consultant shall indemnify, defend, and hold harmless the City, and its elected officials, officers, employees, authorized volunteers, and agents (“City Indemnitees”), from and against any and all causes of action, claims, liabilities, obligations, judgments, or damages, including reasonable legal counsels’ fees and costs of litigation (“claims”), arising out of the Consultant’s negligent performance or Consultant’s failure to perform its obligations under this Agreement or out of the operations conducted by Consultant, including the City’s passive negligence, except for such loss or damage arising from the sole or active negligence or willful misconduct of the City. Notwithstanding the foregoing, in no event shall Consultant’s obligations under this section extend to the proportionate share of fault of any indemnified party. In the event the City Indemnitees are made a party to any action, lawsuit, or other adversarial proceeding arising from Consultant’s performance of this Agreement, the Consultant shall provide a defense to the City Indemnitees or at the City’s option, reimburse the City Indemnitees their costs of defense, including reasonable legal fees, incurred in defense of such claims.

The review, acceptance or approval of the Consultant’s work or work product by any indemnified party shall not affect, relieve or reduce the Consultant’s indemnification or defense obligations. This Section survives completion of the services or the termination of this contract. The provisions of this Section are not limited by and do not affect the provisions of this contract relating to insurance.

Appendix - Resumes
Appendix - Resumes
US 101/Prado Road Interchange • City of San Luis Obispo • July 2024 • 112 Brent will leverage his 38 years of public-sector experience providing oversight on projects and will act as an advisor and advocate for clients and mentor for staff. Brent has extensive experience on both the public agency and consultant side. His career includes 18 years at Caltrans where he served in many roles including: Staff Engineer, Project Engineer, Design Engineer, Geometric Reviewer, Design Manager, and Capital Delivery Manager while delivering projects statewide.

He provides a valuable perspective on transportation projects that span major interchanges, bridges, corridor studies, roundabouts, roadways, and trails. He has led numerous design teams in the development of Project Study Reports, Project Reports, and PS&Es. From the smallest to the largest, most complex project, the thing that sets Brent apart is his second-to-none project management and collaboration skills.

Select Project Experience
ATWATER - MERCED EXPRESSWAY PHASE 1B, Merced County, CA; Project Manager & PrincipalIn-Charge. Brent was responsible for developing the Environmental Document, Report Project, and PS&E package for the construction of approximately one mile of new expressway near State Route 99 south of the City of Atwater in Merced County. The project evaluates several alternative alignments for a two-mile segment of four-lane divided expressway. Improvements will be phased with Phase 1B constructing approximately one mile of the new expressway consisting of a two-lane interim facility which is expected to facilitate ongoing economic development through improved freight mobility (including accessibility to the Mid-California International Trade District), and benefit surrounding communities with increased safety, air quality, and mobility to nearby schools, residences, and businesses.

STATE ROUTE 4 BALFOUR ROAD INTERCHANGE; City of Brentwood, Contra Costa County, CA; Project Manager. A phased interchange improvement project to convert an existing at-grade intersection with the City of Brentwood to an interchange. The project included significant utility relocations involving PG&E transmission towers, PG&E underground joint trench construction with AT&T, Comcast and the City participating, relocation of a 10-inch Kinder Morgan high-pressure oil line and booster station, Contra Costa Water District 90-inch Los Vaqueros Pipeline. As the project manager, Brent led the utility effort and developed reports of investigation, utility agreements and staging plans to accomplish the work without disruption to service. The interchange area provides access to a high school, middle school and regional medical center which necessitated access to these facilities throughout construction. John Muir Regional Medical facility included a Helipad adjacent to the freeway and required the proposed improvements meet FAA clearance requirements.

Brent also led the efforts with the East Contra Costa Habitat Conservancy, coordinated permitting agreements and monitoring report requirements. He provided direction for the completion of the environmental revalidation which required three separate addendums through the life of the design phase of the project. Lead the project team in concert with working with Caltrans functional units to obtain project approvals, the City of Brentwood, the SR4 Bypass Authority, Contra Costa County (performing right of way acquisitions) and the Contra Costa Transportation Authority.

US 50 EL DORADO HILLS/LATROBE ROAD INTERCHANGE PHASE 2B, El Dorado County, CA; Project Manager. Brent served as project manager for this phased interchange improvement project delivered within 2 ½ months from the notice to proceed. This unprecedented accelerated delivery was in response to the County DOT’s desire to capture CMIA fund savings and further the completion of ultimate interchange improvements. The project included right-of-way acquisitions, utility relocations (PG&E electric, AT&T fiber, and Comcast fiber), ACOE Nation Wide Permit, signalized

EXPERIENCE
38 years

EDUCATION
MS, Civil Engineering,
California State University,
Fresno
BS, Civil Engineering, California
State University, Fresno

REGISTRATION
Professional Civil Engineer -
CA #46715
Project Management Institute -
PMP Cert #2022265

YEARS WITH CONSOR
16 years
R. Brent Lemon, PE, PMP
Project Manager
US 101/Prado Road Interchange • City of San Luis Obispo • July 2024 • 113 intersections, ramp metering, a new off-ramp bridge and complex staging. Expedited approvals were completed for mandatory and advisory design exceptions and longitudinal utility encroachment exceptions approval through Caltrans Headquarters. Consor was able to capture over $16 million in construction funding for this project which is currently under construction.

US 50/PHASE 1 HOV LANE (PS&E), El Dorado County, CA;
Project Manager. Responsible for preparing the PS&E of initial improvements within the corridor (Phase 1 HOV Lane Project), which were constructed as part of the Governor’s Corridor Mobility Improvement Account (Prop 1B). This complex project was delivered in less than 12 months from notice to proceed to advertised construction documents. Development of the project plans included coordinating with five separate environmental documents, performing an environmental revalidation during the PS&E phase, developing complex stage construction plans for replacement of the Latrobe Road UC while maintaining local road access within the interchange, widening of the Clarksville UC, coordination of high risk utility facilities, obtaining approval for a Longitudinal Utility Encroachment Exception from Caltrans, approvals of mandatory and advisory design exceptions and developing a pavement rehabilitation strategy for 3-miles on mainline U.S. 50. Pavement rehabilitation included establishing a new profile grade, variable depth paving, and cross slope corrections.

STATE ROUTE 20/WESTERN PARKWAY, YUBA CITY, CA; Project
Manager. Responsible for delivery of a PSR/PR, preparing the environmental document, obtaining City approval for local street access modifications, obtaining California Transportation Commission approval for a new connection to State Route 20, and developing the project plans, specifications, and estimate for this major intersection and local street improvement project.

This project was delivered in two phases, the first phase of improvements were included in a construction contract change order to an on-going Caltrans administered contract on SR20 to perform pavement rehabilitation on the mainline highway. This first phase required development of the change order, specifications and estimate for the Caltrans Resident Engineer to negotiate and administer in the field. Improvements implemented were widening SR 20 for a right & left turn pockets, paving the median, correcting superelevation and drainage improvements. This approach saved the City over $1 million in estimated capital improvement costs.

The second phase involved construction of the local street “T” Intersection improvements which included utility relocations, signals, lighting, drainage, Caltrans right-of-way mapping, recording quit claim deeds for Caltrans and local agency right-of-way changes.

The second phase was constructed by the local agency under a Caltrans encroachment permit.

OLD DAVIS ROUNDABOUT, UNIVERSITY OF CALIFORNIA, DAVIS;
Project Engineer. A project to improve the Old Davis Road intersection with California Avenue on the campus of the University of California, Davis. This intersection is the main campus entrance for Interstate 80 traffic exiting to the campus. The improvements are compatible with future facility expansion plans adjacent to the project area. This required the Consor team to utilize AutoCAD files from the university’s GIS system for base mapping preparation. The project had an expedited delivery time line which required the final PS&E package to be developed within a four-month time frame.

PEASE ROAD INTERCHANGE PROJECT REPORT, CITY OF YUBA
CITY, CA; Project Manager. Responsible for developing interchange alternatives and preparing the Project Report and coordinating the Environmental Document for this interchange project. Interchange alternatives included a Type L-2 with roundabouts at the ramp intersections, a Type L-7, and a Type L-9.

STATE ROUTE 246/ALAMO PINTADO ROAD, SOLVANG, CA; Project Manager. Responsible to develop a Project Study Report (PSR) for traffic operational improvements to the State Route 246 and Alamo Pintado Road intersection. Developed a multi-lane roundabout alternative and worked closely with Caltrans in facilitating Design Workshops between the City and Caltrans to obtain approval of the Roundabout Concept Approval Report. The project also involved developing a conventional intersection widening alternative to provide the necessary capacity. Other issues that were addressed included bridge replacement/widening alternative investigation, hydraulic studies of Alamo Pintado Creek, access management of multiple ingress/egress points on intersection approaches, development of alternative creek crossings for a Class 1 bike path, utility relocations, and development of a roundabout north of the study intersection.

BRIDGE STREET BRIDGE (HBP), CITY OF ARROYO GRANDE, CA;
Roadway Project Engineer. Responsible for design alternatives for this historic bridge (built in 1908) replacement project.

Replacement or rehabilitation of the structure will require closure of the local road in a highly sensitive historic district of down town Arroyo Grande. Public outreach efforts have included the community, business interests, and the historic society. The existing bridge is a steel truss that is both functionally obsolete and structurally deficient. The replacement structure needed to clear span the Arroyo Grande Creek approximately 115 feet.

The rehabilitation of the existing bridge maintained the same span lengths, although all of the substructure needed to be replaced. Utility relocations included a six-inch gas main. This project required close coordination with Caltrans to navigate the Section 106 Process, development of the FNOAE, evaluation of 4f impacts both for historic resource and park access. This project also involved close coordination with several stakeholder groups including historic societies all closely monitoring project. Project was completed in February 2021.

US 101/Prado Road Interchange • City of San Luis Obispo • July 2024 • 114 As a former Deputy Director of Transportation for the County of Santa Barbara, Dace has experience working with citizen groups, regulatory agencies, boards and commissions, and special interest groups which will be of great value to all her clients. She has over 26 years of experience on transportation projects in both design and construction and spent over 9 years with the Public Works Department of the County of Santa Barbara where she spent 4 years as the Deputy Director responsible for the Transportation Division. Dace brings a strong project management background as well as a wealth of experience in civil, transportation, and bridge design. She also has a wealth of knowledge of Federal, State, and Local Transportation Funding.

Select Project Experience
DEL RIO ROAD/US 101 INTERCHANGE IMPROVEMENTS, City of Atascadero, CA; Project Engineer. Responsible for the preparation of the PSR for the interchange improvements at the Del Rio Road/US 101 Interchange. The improvements consist of two roundabouts, one at each ramp termini and planning for a third roundabout at the local frontage road. Dace worked closely with the internal and external team members to successfully complete the PID phase of the project.

US 101/BETTERAVIA INTERCHANGE IMPROVEMENTS, City of Santa Maria, CA; Project Manager. The City of Santa Maria was experiencing a large amount of development on the Enos Ranchos property just west of the US 101/Betteravia Interchange. As a result of this development and other growth within the City, improvements to the interchange were needed. Dace and her team worked with the City to develop an interim solution to increase vehicle storage on eastbound Betteravia for vehicles wanting to access northbound US 101 and widening the southbound US 101 offramp to accommodate a dedicated right turn lane. Dace was the Project Manager responsible for the PS&E package for the improvements and the PEER document for the Caltrans Encroachment Permit. The project offered much needed relief for the interchange and allowed the City to work with Caltrans on needed long term improvements to the interchange.

PRADO ROAD BRIDGE WIDENING, City of San Luis Obispo, CA; Roadway Project Engineer. The existing bridge is a constriction point for vehicles traveling along Prado Road between South Higuera and US 101 and is in need of widening for current and future traffic volumes. The existing three-span bridge structure is going to be replaced with a single-span bridge to offer protection to an existing 24-inch diameter gravity sewer line in times of high-flow. A dual retaining wall system will be constructed along the creek banks to provide additional hydraulic capacity and sour protection for the new bridge.

CENTRAL AVENUE OVERPASS, City of Newark, CA; Independent Check. Responsible for the independent check of the overhead structure for Central Avenue over the Union Pacific Railroad (UPRR) right-of-way, between Sycamore Street and Morton Avenue. The bridge structure is a 940-foot-long,, seven-span precast, prestressed California Wide Flange bridge. The bridge is supported on large diameter cast-in-drilled hole concrete piles. The design and the check of the bridge was made additionally more complicated given the varying heights of the bents. This resulted in the need to balance the stiffnesses between the eight supports to meet current Caltrans Seismic Design Criteria. This balance was achieved through different connections between the superstructure and substructure and between the dropped bent cap and the concrete columns. The bridge width varied from just over 74 feet wide to 84 feet wide. Given the amount of variations in the geometry of the bridge, an independent check was performed on all eight supports, the seven girder spans, and multiple girders per span.

EXPERIENCE
28 years

EDUCATION
MS, Structural Engineering,
University of California,
Berkeley
BS, Civil Engineering,
University of California, Davis

REGISTRATION
Professional Engineer -
CA #54408

YEARS WITH CONSOR
4 years
Dace Morgan, PE
Deputy Project Manager/Roadway Project Engineer
US 101/Prado Road Interchange • City of San Luis Obispo • July 2024 • 115 With 36 years of experience, Mark has been involved in and responsible for the PS&E and construction support of over 170 projects involving more than 280 bridges, primarily throughout California and other western states. These projects have included new structures, widenings, upgrades, retrofits, as well as retaining structures, storm damage and emergency projects. Mark is a nationally recognized bridge engineer and project manager and serves on several national committees and boards. He has also been involved in delivering projects in Caltrans District 5 for nearly 30 years. His extensive project experience coupled with his many agency and resource contacts enables him to effectively manage and deliver successful transportation projects. He also brings a keen understanding of local, state, and federal funding programs. Mark is a former Branch Chief in Caltrans Division of Structures and has extensive experience delivering Caltrans on-system projects not only internally to Caltrans but also externally working as a consultant for Local Agencies.

Mark brings a solid understanding of the City’s staff, processes and has worked with various City staff on multiple projects with other agencies. In addition, he maintains strong relationships with the City, Utility, Regulatory Agencies and Caltrans District 5 personnel.

Select Project Experience
TRAFFIC WAY BRIDGE REPLACEMENT, City of Arroyo Grande; Principal-In-Charge, Project Manager. Mark was responsible for completing the preliminary scour evaluation of the bridge and then supported the City in securing Highway Bridge Program (HBP) federal funds for the replacement of this scour-critical bridge. Mark has led the team in the development of all the necessary documents for the NEPA and CEQA clearance and is currently closing out the right of way phase. Mark proposed the early NEPA delivery alternative on this project which has saved one year of the overall delivery. This project requires a complex and out of the box solution for construction access, has eliminated the need for any permanent right of way acquisitions and required coordination with Caltrans for various encroachment requirements and permits of the project. Currently scheduled for construction in 2025.

I-680/SR 4 INTERCHANGE (PHASES 1, 2A & 4), Contra Costa County; Project Manager. Under contract to Contra Costa Transportation Authority (CCTA), responsible for independent quality control review of the entire project design submittals including both Roadway and Structures elements. This project includes the increase and reconfiguration of the current interchange requiring large direct connector ramps. Responsible for providing quality control review of reports, advanced planning studies, type selection reports, DIB-78, proposed design exception listings, providing constructability reviews, quality control reviews of engineering plans for 35%, 65%, 95% & 100% submittals prior to submittal to Caltrans. Structures including widenings, retaining walls, connectors.

STATE ROUTE 4 BALFOUR ROAD INTERCHANGE; City of Brentwood, Contra Costa County, CA; Principal-in-Charge. Mark was responsible for this intersection replacement project. His team developed a project study report/project report and prepared the PS&E package to construct a grade-separated interchange at State Route 4 and Balfour Road in the City of Brentwood. The interchange replaced an at-grade intersection and included the construction of bridges, utility relocation, drainage facilities, and traffic signals. The replacement also required coordination with Caltrans, Contra Costa Transportation Authority, the City of Brentwood, the local regional water quality control board, and various utility agencies.

EXPERIENCE
36 years

EDUCATION
BS, Civil Engineering,
University of California, Davis

REGISTRATION
Professional Engineer -
CA # 47756

YEARS WITH CONSOR
22 years
Mark Reno, PE
Principal-in-Charge
US 101/Prado Road Interchange • City of San Luis Obispo • July 2024 • 116 With over 20 years of tenure at Consor, Greg started as a student intern and has now served as a Project Manager, Project Engineer, Design Engineer, Assistant Resident Engineer, and Structure Representative on a variety of California transportation projects. What makes Greg’s experience unique is that he has spent approximately 25 percent of his time in the field. As a result, Greg approaches every PS&E package with constructability as one of the primary considerations.

He is an HBP project specialist and uses his strong technical background in conjunction with his knowledge of the federally funded project process to successfully navigate the design, environmental, utility and right-of-way phases.

Select Project Experience
SHELDON ROAD INTERCHANGE, City of Elk Grove, CA; Design Engineer. Replacement structures for the Sheldon Road Interchange over Highway 99. The two-span overcrossing structure (approximately 148-feet wide and 273-feet long) is a cast-in-place, prestressed concrete box girder bridge that was designed to be built in stages so that traffic on Sheldon Road could be maintained throughout construction. This project also involved the design and construction of a free-standing soldier pile wall with a free height of 16.5 feet placed along the edge of the Highway 99 shoulder, near an historic cemetery. In addition, this project involved the design of a replacement PumpPlant Station to maintain the drainage of the low-point of Highway 99.

BRIDGE STREET BRIDGE REHABILITATION (HBP), City of Arroyo Grande, CA; Project Engineer.

Responsible for design alternatives for this historic bridge (built in 1908) replacement project.

Replacement or rehabilitation of the structure will require closure of the local road in a highly sensitive historic district of down town Arroyo Grande. Public outreach efforts have included the community, business interests, and the historic society. The existing bridge is a steel truss that is both functionally obsolete and structurally deficient. The replacement structure needed to clear span the Arroyo Grande Creek approximately 115 feet. The rehabilitation of the existing bridge maintained the same span lengths, although all of the substructure needed to be replaced. Utility relocations included a six-inch gas main. This project required close coordination with Caltrans to navigate the Section 106 Process, development of the FNOAE, evaluation of 4f impacts both for historic resource and park access. This project also involved close coordination with several stakeholder groups including historic societies all closely monitoring project.

BELLO STREET BRIDGE REPLACEMENT (HBP), City of Pismo Beach, CA; Project Engineer.

Responsible or the preliminary engineering and final PS&E for this bridge replacement project.

Consor approached the City of Pismo Beach with an opportunity to secure HBP funding for a bridge that was identified as a “closed bridge” (i.e., a bridge taken out of the National Bridge Inventory [NBI] and therefore not eligible for Federal Funding). Consor got the bridge added back into the NBI and therefore eligible for HBP funding. This project provides a key link back into the City’s network and direct access to the City’s recreation fields and maintenance facilities. The bridge also connects the City’s bike and pedestrian trails.

SANTA LUCIA BRIDGE REPLACEMENT (HBP), City of Atascadero, CA; Project Engineer. Responsible for the replacement of the existing 45-foot-long, conventionally-reinforced concrete T-beam span.

This structure is located within a narrow strip of City right-of-way and is flanked by private property on both sides. This condition presented a challenge as the bridge provides the sole access to this rural residential area. Given the higher ADT, keeping traffic open during construction was a primary consideration. Consor presented several traffic staging alternatives to the City along with the pros and cons of each alternative. This allowed the City to make the best decision for their residents which resulted in less public impact and political fallout.

EXPERIENCE
24 years

EDUCATION
BS, Civil Engineering,
University of California, Davis

REGISTRATION
Professional Engineer -
CA #82850

YEARS WITH CONSOR
24 years
Greg Young, PE
Q u a l i t y A s s u r a n c e / Q u a l i t y C o n t r o l - B r i d g e D e s i g n US 101/Prado Road Interchange • City of San Luis Obispo • July 2024 • 117 Scott is a structural design engineer with experience on bridges, civil structures, and building design projects. He has over 18 years of experience in the design of several bridge projects, retaining walls, and masonry buildings, as well as other miscellaneous hydraulic structures. Scott has been involved in Caltrans and local agency projects in addition to private developer projects.

Select Project Experience
STATE ROUTE 4 BALFOUR ROAD INTERCHANGE; City of Brentwood, Contra Costa County, CA; Structural Designer. The conversion of a two-lane expressway (and at-grade intersection) to a four-lane divided Highway and I/C. This project included the following four structures: (1) Deer Creek Bridge, a single-span, 160-foot-long by 71-foot-wide precast girder bridge; (2) Deer Creek Bridge at EB SR4 On-ramp Bridge, a single-span, 100-foot-long by 48-foot-wide reinforced concrete, box girder bridge on a 150-foot radius curve; (3) Balfour Road UC – Bridge, a two-span, 195-footlong by 92-foot-wide precast girder bridge, of which the design utilized an integral bent cap with continuous post-tensioning; (4) Deer Creek MSE Retaining Wall, a 104-foot-long by 22-foot-high MSE wall.

I-880, 23RD AVENUE AND 29TH AVENUE OPERATIONAL AND SAFETY IMPROVEMENT PROJECT, Alameda County Transportation Commission, Oakland, CA; Structural Designer.

Responsible for the design of eight Mechanically Stabilized Embankment (MSE) walls, one Sound Wall on Barrier/ Retaining Wall, and one concrete cantilever retaining wall. Design has included single stage MSE walls as well as multiple stage constructed geosynthetic reinforced walls to support the approach embankments for the proposed bridges. Also prepared Type Selection Report, design calculations, and final plans for the construction of the walls. For Phase I (PSR/PR) of this $75 million project, responsibilities consisted of the production of an Advanced Planning Study (APS) for two proposed bridge replacements, including 23rd Avenue Overcrossing and the 29th Avenue Overcrossing.

INTERSTATE 15/CALIFORNIA OAKS ROAD INTERCHANGE BRIDGE WIDENING, City of Murrieta, CA; Structural Designer. Responsible for the design of two (2) single-span, cast-in-place posttensioned reinforced box girder bridges and two tieback walls. Prepared Type Selection Report, structural design calculations, engineer’s estimate and final plans for construction. Limited vertical clearance required the superstructure to be constructed above final grade then lowered into place.

PRADO ROAD BRIDGE WIDENING, City of San Luis Obispo, CA; Project Manager. This project replaced the existing Prado Road Bridge with a new bridge and two retaining walls to support the new Prado Road improvements. The existing bridge is a constriction point for vehicles traveling along Prado Road between South Higuera and US 101 and is in need of widening for current and future traffic volumes. The existing three-span bridge structure will be replaced with a singlespan precast concrete wide flange girder bridge which will offer protection to an existing 24-inch diameter gravity sewer line in times of high-flow. Retaining walls will be constructed along the creek banks to provide additional hydraulic capacity and scour protection for the new bridge. The existing Bob Jones Pedestrian bridge will also be relocated on to new abutment supports located further downstream to avoid conflict with the new wider Prado Road Bridge.

EXPERIENCE
21 years

EDUCATION
MS, Civil Engineering,
University of California, Davis
BS, Civil Engineering,
University of California, Davis

REGISTRATION
Professional Engineer -
CA #88532

YEARS WITH CONSOR
11 years
Scott McCauley, PE
Bridge Lead Engineer
US 101/Prado Road Interchange • City of San Luis Obispo • July 2024 • 118 Ashley is a talented and enthusiastic Project Engineer, who excels at managing assigned tasks in support of Consor engineers on multiple projects with specific duties including geometric design, calculating road quantities, spec writing, and support with AutoCad and Microstation.

Select Project Experience
HUER HUERO CREEK BRIDGE & ROUNDABOUT, City of Paso Robles, CA; Bridge Designer.

Responsible for the design of a new, four span bridge over Huer Huero Creek in Paso Robles, California. The Huer Huero Creek Bridge is part of a greater project to construct a realignment of Airport Road. The project is a response to increased traffic demands on Highway 46 in the eastern portion of Paso Robles. The bridge is a cast-in-place, post-tensioned Concrete, box girder bridge on multi column piers with drilled shafts. The bridge design required significant coordination efforts for utilities, hydraulic, and foundation design. Services provided included type selection and the production of plans, specs, quantities, and cost estimates.

MID HIGUERA BYPASS AND BIANCHI LANGE BRIDGE, City of San Luis Obispo, CA; Independent Check. Performed the GP Estimate on this project to replace a single-span steel plate girder bridge approximately 64 feet long and 16 feet wide with a two-span, 120’ long bridge founded on Cast-InDrilled-Hole (CIDH) deep foundations.

LOPEZ DRIVE BRIDGE RETROFIT, San Luis Obispo County, CA; CADD. Performed redlines and minor design for the existing Lopez Drive Bridge spanning over Lopez Lake in San Luis Obispo County, CA. The existing three-span precast concrete girder structure, founded on pier wall substructure, is founded on soil material highly susceptible to liquefaction and lateral spreading.

Responsibilities included the seismic evaluation and design calculations, preparation of a Retrofit Strategy Report, and preparation of plans for the retrofit/ replacement alternatives.

MORGAN TERRITORY ROAD BRIDGES AT PM 5.0 AND PM 5.2, Contra Costa County, CA; Independent Check. Performed independent checks of three soldier pile retaining wall designs. The retaining walls act as wingwall extensions for bridge replacements of two Morgan Territory Road Bridges Crossing Marsh Creek. The existing structures were severely damaged by heavy storm flows and scour making layout of the proposed structures critical for preventing similar damage in the future.

UVAS ROAD BRIDGE OVER LITTLE UVAS CREEK, County of Santa Clara, CA; Independent Check. Replacement of a single span bridge with Precast Pre-stressed I-girders on a realignment of Uvas Road in Santa Clara County, California. Services provided include independent check of the Replacement Bridge and modified Caltrans Type 5 Retaining Wall.

CARROL CREEK & WALKER CREEK BRIDGES, Inyo County, CA; Design Engineer. Carroll Creek:

Design Engineer on this proposed project that includes constructing a new bridge along Carroll Creek Road over the Los Angeles Aqueduct, approximately 275 feet south of the existing bridge and realigning the roadway approaching the bridge from either direction. Walker Creek: Designer Engineer on this proposed project that includes constructing a new bridge along Walker Creek Road over the Los Angeles Aqueduct, approximately 400 feet south of the existing bridge and realigning the roadway approaching the bridge from either direction.

EXPERIENCE
5 years

EDUCATION
BS, Civil Engineering, California
State University, Chico

REGISTRATION
Professional Engineer -
CA #94887

YEARS WITH CONSOR
5 years
Ashley Hanson, PE
Bridge Design Engineer
US 101/Prado Road Interchange • City of San Luis Obispo • July 2024 • 119 Brent has five years of experience as a professional engineer with a focus on transportation engineering. In his tenure with Consor, Brent has assisted the team on multiple projects with duties that include calculating road and bridge quantities, designing road geometry, utility coordination, technical writing, survey field work and map drawing, surveying measurements, and support with AutoCAD and Microstation.

Select Project Experience
DANVILLE BOULEVARD – ORCHARD COURT COMPLETE STREETS IMPROVEMENTS, Pleasanton, CA; Roadway Design Engineer. Brent was responsible for stage construction design of the roadway and roundabout for Danville Boulevard. This complete streets improvement project in Danville located in Contra Costa County includes the implementation of a roundabout on Danville Boulevard. Due to the high ADT of Danville Boulevard the county wanted to keep traffic open through the use of staged construction. Brent worked through the design to keep the flow of traffic along Danville Boulevard while staging the construction of the proposed roundabout.

YANKEE JIMS ROAD BRIDGE OVER NORTH FORK AMERICAN RIVER (HBP), Placer County, CA; Roadway Design Engineer. Brent was responsible for the geometric design of the roadway elements for the Yankee Jims Bridge. The Yankee Jims Bridge is located in a remote area of Placer County and spans over the North Fork of the American River. The rural location of the project site creates many different challenges for design and access to the project for construction. Brent was responsible for implementing design alternatives of over 17 different locations along the access road that need to be altered for the contractor to have access down to the bridge at the project location. Due to the CM/GC project delivery method, Brent was able to work with the contractor to discover the best alternatives for the project. This project includes a large hillside cut to realign the roadway to construct the proposed bridge adjacent to the existing bridge. Brent designed a large infill area to relocate all the excavated cut material from the roadway and minimize all hauling of material off the project site.

MCBEAN PARK DRIVE BRIDGE REPLACEMENT OVER AUBURN RAVINE (HBP), Lincoln, CA; Roadway Design Engineer. Brent was responsible for the geometric design of the roadway and drainage design for the McBean Park Drive Bridge. This project, located in Lincoln, California, includes approximately 0.5 miles of roadway with 1.5 intersections to rebuild and a bridge over Auburn Ravine. Brent used his knowledge of the ADA design standards to design ADA compliant access routes along the stretch of the project. This project includes various utility coordination for intermediated and final stages of utility relocation during the project construction. McBean Park Drive’s drainage plan was designed in conjunction with its many existing drainage features. The proposed drainage plan tied into the existing network to create an efficient and environmentally friendly drainage system.

EMERGENCY STORM DAMAGE ON TORO AND VIEJO ROAD, Monterey County, CA; Roadway Design Engineer. Brent was responsible for the geometric design, drainage design, utility coordination, and plan preparation for the roadway plans at Toro and Viejo Road. These two projects are located in Monterey County. Both these projects include the correction of slope failures and roadway geometry to make the roadway safer. Brent was able to redesign the roadway and drainage systems, which will correct the slope failures and allow water to move through the sites without erosion or slope instability in the future. Utility coordination was needed to move underground utilities out of the way for the construction of the roadway and drainage features.

EXPERIENCE
5 years

EDUCATION
BS, Civil Engineering, California
State University, Chico

REGISTRATION
Professional Engineer -
CA #93977

YEARS WITH CONSOR
5 years
Brent Harrison, PE
Roadway Design Engineer
US 101/Prado Road Interchange • City of San Luis Obispo • July 2024 • 120 Mike has 29 years of experience focused on improving transportation for local agencies and the State of California. He has worked extensively on roadway projects including major corridor improvements, highways, interchanges, as well as local agency bridge replacement and rehabilitation projects in support of the Highway Bridge Program. Mike offers particular expertise in roadway design, geometric layout of highways and ramps, drainage system analysis and design, pavement management, design and coordination of underground utilities, and construction support.

Select Project Experience
COMBIE ROAD WIDENING, Nevada County, CA; Project Engineer. Responsible for utility coordination, drainage and roadway design. The proposed project will include widening Combie Road to five lanes (including a two-way, left turn lane), a traffic signal at the Combie Road/Higgins Road intersection, a shared use Bicycle/Pedestrian Path, along with the extension of a sewer line and other drainage improvements. The project will result in the realignment of a small portion of Ragsdale Creek, requiring consultation with ACOE and coordination with the United States Fish and Wildlife Service regarding potential impacts to California Red-Legged Frog habitat. Also included is a Rule 20A Undergrounding Project where PG&E and AT&T will be relocating to a joint trench.

Work includes PA/ED as well as PS&E.

SHELDON ROAD/WATERMAN ROAD ROUNDABOUT, Elk Grove, CA; Project Manager.

Project Manager responsible for completing the plans, specifications, and estimates to improve the intersection of Sheldon Road and Waterman Road with the construction of a single-lane roundabout. The intersection is located in the east part of Elk Grove within the City’s designated Rural Sheldon/Rural Residential Area and is adjacent to a powerline corridor with Sacramento Municipal Utility District, Pacific Gas & Electric, and Western Area Power Administration. The improved intersection included pervious colored concrete pedestrian paths around the perimeter of the roundabout as well as public art themed to match the rural character of the area. The roadway approach legs included accommodations for shoulders/bike lanes and storm drainage facilities with detention ponds to maintain pre-construction run-off conditions and historical drainage patterns. Construction was completed in less than two months under a full intersection closure. Mike was responsible for the roundabout geometrics, final design, construction details, utility coordination, and community outreach meetings. Mike worked closely with the City of Elk Grove and the community to obtain support for construction under a full intersection closure, which resulted in schedule and construction budget savings. 16TH AVENUE OVER TULARE LAKE CANAL BRIDGE REPLACEMENT (HBP), Kings County, CA; Project Manager/Roadway Project Engineer. Responsible for the design and delivery of PS&E for roadway improvements of the replacement of this bridge. Michael developed the preliminary and final horizontal and vertical layouts. He led the utility coordination effort, which facilitated PG&E’s relocation of a utility pole conflict prior to construction.

PUBLIC WORKS ENGINEER/STAFF AUGMENTATION, Stanislaus County, CA; Project Manager.

Responsible for general project oversight, management, and coordination of multiple bridge replacement projects within Stanislaus County as a part time staff augmentation County employee.

Mike represents the County to facilitate coordination of various project elements with property owners, utility companies, Caltrans and each design team. In addition to daily remote work, Mike's dedication to Stanislaus County includes working in the public works office in Modesto, CA as needed.

EXPERIENCE
29 years

EDUCATION
BS, Civil Engineering,
University of California,
Berkeley

REGISTRATION
Professional Engineer -
CA #60254

YEARS WITH CONSOR
22 years
Michael Sanchez, PE
Utility Coordination
US 101/Prado Road Interchange • City of San Luis Obispo • July 2024 • 121 John has over 30 years of experience as a civil engineer and senior project manager, designing and planning infrastructure for water resources, wastewater treatment, water treatment, pumping, conveyance, and other water-related projects. His experience encompasses detailed civil and mechanical design of infrastructure and equipment, project management, construction management, technical writing, cost estimation, permitting, subcontractor/subconsultant management, and client service for capital improvement projects.

John has extensive experience managing technical subdisciplines such as structural, electrical, instrumentation, SCADA, geotechnical, corrosion/cathodic protection, site civil, mechanical piping and pumping, architectural, and HVAC/plumbing.

Select Project Experience
RESERVOIR TOWER STRUCTURAL AND CONDITION ASSESSMENT, Helix Water District, CA; Project Manager. Project involves a condition assessment and dive inspection of the 150-foot-tall reservoir outlet tower at Lake Jennings. Consor performed a comprehensive 5-day dive inspection of the 150-foot tall Lake Jennings Inlet/Outlet Tower, using six professionally-trained divers with surface-supplied air up to 135 foot dive depth. Consor then prepared a detailed condition assessment report which included a seismic evaluation of the tower. Consor also performed a field evaluation of the existing 54-inch and 60-inch raw water piping connecting the tower and the Levy Water Treatment Plant. The findings of this condition assessment were necessary to inform Helix Water District and other partner agencies for the East County Advanced Water Purification Program that the tower was capable of serving as the primary conduit for purified recycled water delivered through the tower and into the existing water treatment plant.

WELL 13 TREATMENT PLANT DESIGN SERVICES, City of Lakewood, CA; Deputy Project Manager. John served as Deputy Project Manager on this project which includes design and construction support for the City’s Well 13 Arsenic Removal Treatment Plant and was based on results of pilot testing the full‐scale facilities, also performed by the design team. Treatment plant improvements included installation of the filter package, backwash recycle pump, and a ferric chloride feed system. An existing tank at the treatment plant site was proposed by the City to be re-purposed for backwash settling and recycle. Design of the filter equipment incorporated the existing electrical services to supply power to the filter controller, the backwash pump, and the chemical feed facility with single phase power. A cost‐effective control strategy was included to allow staff to remotely monitor the facility and the equipment to operate automatically.Deodar Reservoir Rehabilitation Design, Vista Irrigation District, CA; Project Manager. Consor conducted a comprehensive raft inspection, dry inspection, condition assessment, and seismic analysis of the existing 1.3 MG Deodar Reservoir. This prestressed circular concrete reservoir was constructed in 1976. Consor also performed condition assessment of the existing on‐site buried steel piping.

Following the condition assessment, Consor designed a reservoir rehabilitation consisting of the following elements:Full roof replacement with a new aluminum geodesic roof dome; New interior and exterior stairs, roof hatches, and roof railing; new perimeter road and access road; new cast‐ in‐place retaining wall on the north cut slope; repair of existing retaining walls; new site fencing, gates, and fence replacement; valve replacement; new reservoir overflow and inlet piping and check valves; reservoir coating; on‐site stormwater improvements; and landscaping enhancements.

EXPERIENCE
30 years

EDUCATION
MS, Wind Engineering, Kiel
University of Applied Sciences
ME, Geological Sciences,
Cornell University
BS, Civil Engineering, California
Polytechnic State University,
San Luis Obispo

REGISTRATION
Professional Engineer -
CA #59270

YEARS WITH CONSOR
4 years
John Thayer, PE
U t i l i t i e s D e s i g n - W e t
US 101/Prado Road Interchange • City of San Luis Obispo • July 2024 • 122 Linda has 37 years of experience as a project manager/project engineer for a variety of water and wastewater system improvement projects for public agencies throughout Central and Northern California. Linda has been responsible for the design of both potable water systems and wastewater facilities. Her experience covers a wide range of projects including water distribution, transmission, and storage systems, as well as wastewater collection and treatment facilities. Linda is experienced in water projects which include planning and design of production wells, distribution systems, booster pump stations, storage tanks, and transmission pipelines. Apart from project management duties, Linda performs peer review and QA/QC review on water and wastewater design projects and studies, and is a mentor for junior engineering staff.

Select Project Experience
NUT TREE ROAD OVERCROSSING UTILITY DESIGN, City of Vacaville, CA; Design/Utility Coordinator. Design and construction services for City utilities including water and sewer pipelines for the new six-lane structure and frontage road improvements at Nut Tree Road and I-80. Included relocation of existing water transmission mains and the addition of future transmission capacity for the City in the form of a 24-inch water transmission main crossing under I-80. Coordination with Caltrans for pipeline crossing alternatives was included and resulted in boring and jacking steel casing under the interstate and installing DIP carrier pipe.

NACIMIENTO PIPELINE AT EL CAMINO REAL BRIDGE REPLACEMENT, San Luis Obispo County, CA; Project Manager. Design of an 18-inch raw water pipeline that was relocated from an independent truss structure with deteriorating abutments, onto an adjacent new vehicular bridge that was replacing a structurally deficient bridge over Santa Margarita Creek. The high pressure pipeline (350 psi) is a critical component of the Nacimiento Water Project that delivers raw water over 45 miles from Lake Nacimiento to the San Luis Obispo Water Treatment Plant. The ductile iron pipe was designed to be hung on the north side of the bridge by a series of hangers and brackets, with flex joints, combination air valves, and pump outs to match the existing original design.

Existing cathodic protection on the pipeline and fiber optic cables installed adjacent to the pipeline were replaced and reconnected on each side of the creek crossing.

CENTRAL AVENUE OVERHEAD PROJECT, City of Newark, CA; Project Manager/Engineer.

Responsible for the relocation of potable water and gravity sewer due to the roadway improvements and grade separation structure for Central Avenue over the Union Pacific Railroad (UPRR) right-of-way, between Sycamore Street and Morton Avenue. Closely coordinated with Alameda County Water District (ACWD) and Union Sanitation District (USD). The pipelines ranged in size from 8 inch to 24 inch diameter. The design included bore and jack at the UPRR crossing.

The project scope includes preliminary engineering, final design and preparation of construction bid documents.

CONN CREEK BRIDGE WATER LINE PROJECT, City of Calistoga, Calistoga, CA; Project Manager.

The City of Calistoga’s existing potable water pipeline under Conn Creek has historically been exposed to erosion, scour damage, and in 2006 required emergency repairs. The concrete cap over the pipeline was exposed and in need of repair. Repeated repairs/maintenance in the creek bed have impacted the natural habitat of endangered California Freshwater Shrimp and threatened and endangered salmonids. The project included design of a 16-inch transmission main (increased capacity for the City), attached to a bridge recently completed by Caltrans. The City received an HMPG grant through FEMA for 65% design. The project included coordination with environmental agencies to obtain permits. Local indigenous Tribes were involved to monitor the project.

EXPERIENCE
37 years

EDUCATION
MS, Civil Engineering,
California State University,
Sacramento
BA, Geography, University of
California, Davis

REGISTRATION
Professional Engineer -
CA #49691
OR #91396

YEARS WITH CONSOR
9 years
Linda Scroggs, PE
U t i l i t i e s D e s i g n - W e t
US 101/Prado Road Interchange • City of San Luis Obispo • July 2024 • 123 As one of our stormwater enthusiasts, Nick brings expertise in the design construction of various types of stormwater projects, including pipeline design, low impact development, regional treatment and detention systems and integration with other adjacent utilities. He is also wellversed in transportation, water and wastewater, making him one of the firm’s sought-after crossdiscipline engineers. A returned Peace Corps volunteer, Nick’s work experience extends outside of the boundaries of the United States on projects ranging from master planning to site development.

While he enjoys getting technical, it’s engaging with clients, colleagues, system operators, maintenance personnel, and the community that truly motivates Nick. While he nourishes existing relationships, he also develops new relationships to connect people who share common goals and can support one another in their passion for sustainable infrastructure. This sustainable infrastructure passion has even earned Nick some valuable certifications such as LEED AP BD+C and ENV SP.

Select Project Experience
STORMWATER MASTER PLAN UPDATE; City of Sherwood, OR; Project Manager. Consor updated the City of Sherwood’s 2007 comprehensive Stormwater Master Plan in coordination with Clean Water Services (CWS) and the governing watershed-based DEQ NPDES Permit. Planning work for the City was conducted in parallel to a sanitary sewer master plan update to efficiently assess stormwater management issues. The project utilized current City as-builts, planning documents, GIS mapping, and hydrologic/hydraulic modeling and analysis using InfoSWMM, (EPASWMM 5 hydraulic engine) and Tualatin River Urban Stormwater Tool (TRUST).

COOPER MOUNTAIN UTILITY PLAN (CMUP); City of Beaverton, OR; Technical Advisor QA/ QC. Consor provided planning and design services to cohesively integrate stormwater, water, and wastewater utilities within the urban reserve area (URA) boundary expansion of Cooper Mountain. Stormwater services include natural area enhancement strategies that complement utility corridors, including low impact stormwater infrastructure and resilient streams, coupled with permitting guidance and building consensus with regulators for those approaches. Future storm conveyances were sized to reflect regional detention and treatment needs. This approach maximized develop-able land by prioritizing and co-locating in-stream stormwater management within vegetated corridor buffers. Nick oversaw production of deliverables and provided QA/QC review of project documents.

MASTER PLANNING SERVICES; City of Pendleton, OR; Project Engineer. Consor developed stormwater, sewer, and water master plans for the City of Pendleton. The first step in the project was to develop a GIS database for each of the water, sewer, and stormwater utilities for use in developing hydraulic models and supporting the overall master plan development. The plans evaluated the ability for the City to meet existing and future service requirements for all three utilities through build-out. The project will included updated design and construction standards for use internally as well as for developer reference. A CIP was developed to address any existing and future projects. Consor delivered updated water, sewer, and stormwater GIS and associated hydraulic models as part of the project.

EXPERIENCE
22 years

EDUCATION
BS, Civil Engineering, Oregon
State University

REGISTRATION
Professional Engineer -
OR #72710PE
WA #52873
CO #55472

CERTIFICATION
U.S. Green Building Council,
LEED AP BD+C
Institute for Sustainable
Infrastructure, ENV SP

YEARS WITH CONSOR
10 years
Nicholas McMurtrey, PE, LEED AP, ENV SP
LEED/Envision
US 101/Prado Road Interchange • City of San Luis Obispo • July 2024 • 124 Erin has 12 years of experience focused on structural systems for flood risk management projects, and is currently serving as Consor's Hydraulic Structures Practice Lead. Prior to joining Consor, Erin worked for the U.S. Army Corps of Engineers (USACE) where she served as a structural engineer subject matter expert and technical lead specializing in the design, inspection, operation, and repair of hydraulic steel structures for multi-million-dollar flood risk management and navigation projects across the US. Erin is experienced in performing design charrettes and value engineering studies for large-scale, multi-disciplinary projects which involved leading design teams, consulting with stakeholders, understanding project requirements, and improving operations and material selection. While Erin has a structural background, she has a passion for environmental stewardship and green infrastructure dating back to her time as an Eco-Rep while attending the University of Vermont.

Erin will be able to utilize her design charrette experience and passion for environmental sustainability to lead the project team through sustainable project selections and application of a sustainable rating system.

Select Project Experience
FIBER REINFORCED POLYMER (FRP) COMPOSITE PROGRAM, USACE, Inland Navigation Design Center; Program Lead. Erin led, developed, and implemented the FRP Composite Program to expand hydraulic structures applications in USACE. She coordinated with partners in other federal agencies, industry, and researchers to expand the use of FRP in civil works structures. Erin provided expertise on FRP while participating in design charrettes and presented to varying audiences in workshops and on virtual platforms. She planned and developed guidance documents. Erin coordinated presentors and facilitated bi-monthly meetings for the USACE FRP Composite Users’ and Interest Group.

MITER GATE AND ANCHORAGE REPLACEMENTS AT LOCKS 2-10, USACE; Technical Lead & Structural Lead. Erin led multi-disciplinary design teams through project conception, design charrettes, development of plans and specifications, contract award, engineering-duringconstruction, and installation for the miter gate and anchorage replacements at ten lock and dam sites on the Mississippi River. Erin increased commonality of components with site standardization, and worked through complex, short fuse issues to develop engineering solutions with Engineering and Operations team, A/E firms, and Contractors. Erin led the development of the scope, schedule, and budgets for these multifaceted multi-million-dollar navigation projects.

FARGO MOORHEAD METROPOLITAN AREA PROGRAM, USACE, St. Paul District, MN; Structural. Erin developed designs, plans, and specifications for the dam control building, waterway and safety signs, stairs, walkways, and miscellaneous features, and performed QC reviews of the dam bulkheads, control structure foundation, Tainter gates, and gage well house for three control structures on the Fargo-Moorhead Metropolitan Area Flood Control Diversion Project. Performed design reviews and sustainability reviews and coordinated across multiple disciplines on this multibillion-dollar Public-Private Partnership project.

EXPERIENCE
12 years

EDUCATION
MS, Civil Engineering, Johns
Hopkins University
BS, Civil Engineering,
University of Vermont

REGISTRATION
Professional Engineer -
MN #56000
WA #24004487
OR #104731PE
TX #152176

CERTIFICATION
LEED AP #10932410
Envision SP #62934
PMI, Project Management
Professional #7780505

YEARS WITH CONSOR
< 1 year
Erin Krug, PE, LEED AP, ENV SP, PMP
LEED/Envision
US 101/Prado Road Interchange • City of San Luis Obispo • July 2024 • 125 Lincoln is a Senior Consulting Manager within AECOM’s National Infrastructure Economics Practice and is the national lead for Grant Support Services for Transportation. He has more than two decades of international experience across a wide spectrum of strategic planning, economic analysis, and project management in infrastructure advisory, transportation economics, land use economics, and regional development. Lincoln specializes in the development and support of grant applications for public and private sector clients, as well as grant administration once projects are awarded federal funding.

Select Project Experience
US 64 ITHMAS HIGHWAY CORRIDOR RECONSTRUCTION, MPDG Grant Application. Lincoln was the author, lead economist, and grant coordinator in the development of an application for the New Mexico Department of Transportation and Navajo Department of Transportation for MPDG grant funding. The project comprised the reconstruction of approximately 26 miles of highway in northwest New Mexico which acts as the primary access to the Navajo Nation. Improvements include bridge replacement, shoulder widening, safety and lighting upgrades, and the installation of fiber conduit. The application was awarded $59M in funding in January 2024.

BORDER HIGHWAY CONNECTOR AT SANTA TERESA PORT OF ENTRY, INFRA Grant Application.

Lincoln was the author and coordinator of a successful turnkey grant application submitted by New Mexico Department of Transportation seeking funding under the 2022 INFRA grant program. The project comprised the development of a six-mile-long greenfield highway facility connecting the Santa Teresa Port of Entry with Interstate 10 near El Paso. The implementation of the project will result in the removal of commercial traffic from local roads, leading to improved safety, as well as the more efficient movement of freight between the nation’s ports of entry, interstate system, and intermodal facilities. The project was awarded $45M in funding in September 2022.

US64 ITHMAS HIGHWAY CORRIDOR RECONSTRUCTION, RAISE Grant Application. Lincoln was the author, lead economist, and grant coordinator in the development of an application for the New Mexico Department of Transportation and Navajo Department of Transportation for RAISE grant funding. The project comprised the reconstruction of approximately 26 miles of highway in northwest New Mexico which acts as the primary access to the Navajo Nation. Improvements include bridge replacement, shoulder widening, safety and lighting upgrades, and the installation of fiber conduit. The application was awarded $25M in funding in November 2021.

US 74 CORRIDOR OPPORTUNITIES FOR RURAL EFFICIENCY & SAFETY IMPROVEMENT (CORESI), INFRA Grant. Lincoln was the primary author of the successful application for this project spanning 350 miles of the US Route 74 corridor between Asheville and Wilmington in North Carolina. Comprising the construction of bypasses, safety improvements, ITS upgrades, and the installation of hundreds of miles of fiber optic cabling. The CORESI project will bring about a harmonization and continuity of free flow (toward full control of access) along the key freight corridor, with outcomes including an increase in vehicle capacity, faster travel times throughout the entire corridor, a decrease in recurring and non-recurring congestion, and improved safety conditions resulting in a reduction in accidents and fatalities. Furthermore, the installation of fiber optics cabling will enable the foundation for the future deployment of ITS technologies providing tremendous potential for many other communications mechanisms including broadband internet, cameras, and future connected and autonomous vehicle (both passenger and freight) technology.

The project was awarded $25 million under the INFRA program in July 2020.

EXPERIENCE
23 years

EDUCATION
Master, Business, Macquarie
University, Sydney
Master, International
Relations, Macquarie
University, Sydney
Bachelor of Arts, History,
University of California, Santa
Barbara/Universidad de
Barcelona, Spain

YEARS WITH AECOM
13 years
Lincoln James
Grant Writing Assistance
US 101/Prado Road Interchange • City of San Luis Obispo • July 2024 • 126 Nathan Brierley is a Senior Consultant in the Infrastructure Economics team at AECOM. He has over seven years of experience providing economic and financial advice to support public and private sector clients with strategic planning and investment decisions. He is experienced in benefit-cost analysis (BCA), grant writing, economic impact analysis and other bespoke economic and financial analysis across a range of infrastructure types including transportation and others. Prior to joining AECOM, Nathan worked at Deloitte Access Economics and Infrastructure Australia.

Select Project Experience
BIPARTISAN INFRASTRUCTURE LAW SYSTEM SUPPORT, BNSF. Nathan is working with BNSF to identify opportunities for funding across the Red River and Southwest Divisions. An extensive pipeline of potential projects has been developed through research and consultation, and various discretionary grant programs have been reviewed to identify potential funding opportunities. The scope also involves grant writing and benefit-cost analyses (BCA) to support the various applications.

REGION 1 BRIDGE PRE-SCOPING STUDY; COLORADO DEPARTMENT OF TRANSPORTATION.

Nathan is currently working with the Colorado Department of Transportation (CDOT) to prioritize and identify funding opportunities for structures across Region 1. This engagement involves prioritizing the structures in need of rehabilitation or replacement and researching various discretionary grant programs to identify competitive candidates. The scope also involves grant writing and BCA to support the various applications.

DOWNTOWN RAIL EXTENSION PROJECT, TRANSBAY JOINT POWERS AUTHORITY. Nathan supported the BCA for the Downtown Rail Extension (DTX) Project, to support the Transbay Joint Powers Authority’s application for the 2023 Federal-State Partnership (FSP) for Intercity Passenger Rail Discretionary Grant Program. The DTX Project will extend Caltrain commuter rail from its current terminus at Fourth and King to the new Transit Center. It will also deliver the California High-Speed Rail Authority’s future high-speed rail service to the Transit Center. Because the program focused specifically on intercity passenger rail, the BCA considered the costs and benefits to California High-Speed Rail only. The range of economic costs and benefits included economic competitiveness, safety, quality of life, environmental sustainability, and state of good repair.

LOUISIANA INTERNATIONAL TERMINAL, PORT OF NEW ORLEANS. Nathan supported the BCA for the Louisiana International Terminal (LIT) Project, as part of the Port of New Orleans’ application for the 2023 Multimodal Project Discretionary Grant (MPDG) Program. The BCA considered transportation cost savings, container handling savings, accident cost savings, social cost savings, emissions reductions, and residual value.

INTERSTATE 25 NORTH, SEGMENT 5 PROJECT, WELD COUNTY, CO. Nathan developed the BCA for the Interstate 25 North, Segment 5 Project, as part of Weld County’s application for the 2023 Multimodal Project Discretionary Grant (MPDG) Program. The BCA monetized benefits related to safety, state of good repair, economic impacts, freight movement and job creation, climate change, resiliency, and the environment.

DAVE LYLE BOULEVARD PEDESTRIAN BRIDGE PROJECT, CITY OF ROCK HILL, SC. Nathan led the BCA for the Dave Lyle Boulevard Pedestrian Bridge Project, as part of the City of Rock Hill’s application for the 2023 Reconnecting Communities and Neighborhoods (RCN) Program. The BCA monetized benefits related to safety, economic strength, equity, and climate and sustainability.

EXPERIENCE
7 years

EDUCATION
Bachelor of Commerce,
Economics & Finance with
Honors (Economics) (Class I),
Griffith University, Australia

YEARS WITH AECOM
1 year
Nathan Brierley
Grant Writing Assistance
US 101/Prado Road Interchange • City of San Luis Obispo • July 2024 • 127 Kendall Myers is an Economist with AECOM’s National Infrastructure Economics Practice. She brings experience in economic analysis and both quantitative and qualitative research. In her daily work, she applies skills in project management, benefit-cost analyses, and economic modelling. In less than two years, Kendall has assisted clients to win $500 million in federal grants. Kendall has strong interests in economic development, environmental resilience, and demography.

Prior to joining AECOM, Kendall was a Research Assistant at Vanderbilt University’s Owen Graduate School of Management. In that role, she managed various research projects involving wage discrepancy, project evaluation, survey formation, climate change and more. This research was performed using Stata, R/RStudio, REDCap, and advanced Microsoft Excel functions.

Select Project Experience

NEW RIVER GORGE BRIDGE STRUCTURAL HEALTH MONITORING PROJECT APPLICATION

TO STRENGTHENING MOBILITY AND REVOLUTIONIZING TRANSPORTATION (SMART) GRANT PROGRAM, New River Gorge National Park & Preserve, West Virginia Department of Transportation Division of Highways (WVDOT DOH). Kendall developed the grant narrative to support WVDOT’s application seeking funding to plan and install a system of sensors to monitor the structural health of the historic, marquee New River Gorge Bridge in Fayette County, West Virginia.

GOLD LINE EASTSIDE TRANSIT CORRIDOR PROJECT, Los Angeles County Metropolitan Transportation Authority. Kendall was the task lead for preparing Growth-Inducing Impacts Technical Report according to local trends and National Environmental Policy Act (NEPA) guidelines.

The Project would extend the Los Angeles County Metropolitan Transportation Authority’s (Metro’s) E Line, a light rail transit (LRT) line, 4.6 miles from its current terminus at the Atlantic Station in the unincorporated community of East Los Angeles to the cities of Commerce and Montebello.

AMTRAK CASCADES CORRIDOR IDENTIFICATION AND DEVELOPMENT (CORRIDOR ID) PROGRAM GRANT APPLICATION, Washington Department of Transportation (WSDOT).

Coordinated efforts between Amtrak, WSDOT, and Oregon Department of Transportation (ODOT).

Contributed to the development of narratives, maps, and graphics for the corridors, including rolling submissions of drafts for client review and feedback. This project was awarded an initial $500 thousand in December 2023.

RAIL DIVISION, CORRIDOR IDENTIFICATION, AND DEVELOPMENT (CID) GRANTS, North Carolina Department of Transportation. Kendall supported the development of five CID grant application narratives on behalf of NCDOT. Assessed possible corridors against state planning documents. NCDOT was awarded an initial $1 million for the Asheville to Salisbury and WinstonSalem to Raleigh routes in December 2023.

REBUILDING AMERICAN INFRASTRUCTURE WITH SUSTAINABILITY & EQUITY (RAISE) PROGRAM GRANT APPLICATION, City of Hartford, CT. Kendall led the development of the BCA to support the City of Hartford’s 2023 Rebuilding American Infrastructure with Sustainability and Equity (RAISE) program grant application seeking funding to transform an existing multilane roadway into an inclusive complete street that improves safety, connects communities, and promotes active transportation and transit options by improving amenities for transit users, pedestrians, and cyclists. Authored supporting technical memo documenting the BCA approach, assumptions, and findings. This project was awarded $19 million in June 2023.

EXPERIENCE
5 years

EDUCATION
MA, Economics, Graduate
Program in Economic
Development, Vanderbilt
University
BS, Business & Economics,
Minors in Spanish &
International Business,
University of Kentucky

REGISTRATION
Professional Engineer -
CA #84726
Qualified SWPPP Developer/
Practitioner (QSD/P) #26790

YEARS WITH AECOM
2 years
Kendall Myers
Grant Writing Assistance
US 101/Prado Road Interchange • City of San Luis Obispo • July 2024 • 128 Maxim Nasab has international experience as an architect, having worked in the United States, Canada, and China. With over 10 years of experience, Maxim has worked on dozens of bridge projects as lead bridge design architect including Centennial Park Bridge, Blue Ridge Pedestrian Bridge, Sumner Street Pedestrian Bridge, and Kosciusko Bridge. He is a spokesperson for bridge architecture and has published countless articles on the subject and has given presentations regarding the importance that aesthetics and architects bring to infrastructure projects.

Maxim is a licensed architect as well as NCARB Certified, allowing him to have reciprocity throughout the United States and Canada. He currently serves as Leadership for NCARB’s Item Development Subcommittee, is a member of AIA Tallahassee’s Board of Directors, and is an visiting professor at Florida Agricultural & Mechanical University’s School of Architecture.

Select Project Experience
BLUE RIDGE ROAD PEDESTRIAN BRIDGE, Raleigh, NC. The City of Raleigh contracted the design team to provide professional engineering design services, final construction plans, and contract bid documents for the bicycle and pedestrian improvement project located near the heart of Downtown Raleigh. The project consists of designing a gateway-pedestrian bridge that crosses Wade Avenue, a six-lane, controlled-access freeway entering Downtown Raleigh, and extensive stakeholder outreach. Maxim is the bridge architect on the project.

CENTENNIAL PARK BRIDGE, Cañon City, CO. This small design/build project focuses on the City of Cañon City’s desire to create a “WOW Factor” at night with their historic steel truss bridge that crosses the Arkansas River. The project is part of a larger master plan to enhance connectivity with Main Street businesses and Centennial Park. Maxim was the lead architect on the project to design and specify all the lighting.

SUMNER STREET BRIDGE, Akron, OH. The University of Akron in Ohio required an up-to-date replacement for one of their pedestrian bridges crossing Sumner Street in the center of campus.

The bridge connects two important nodes for the school; the student union and the Auburn Science and Engineering building. The connection is a main artery for the campus to get students from one side to the other. Maxim was the bridge architect responsible for the design of all aesthetic elements including the materials, texture, pier types and shapes as well as the stairways and aesthetic lighting.

Publications
Nasab, M., Pre-Fabricated Without Compromising Unique Design. Proceedings of International Bridge Conference (IBC). (2023) National Harbor, MD.

Nasab, M., Prescribing Bridge Architecture for Social Resilience, The Evolving Metropolis, 2019 IABSE Congress, New York, NY.

Nasab, M., The Architect’s Role in Designing Sustainable Bridges: An Essay, Florida/Caribbean ARCHITECT, AIA Florida Magazine, 2018.

EXPERIENCE
13 years

EDUCATION
Master of Architecture,
Savannah College of Art &
Design
Bachelor of Fine Arts,
Savannah College of Art &
Design

REGISTRATION
Architect - CA #C-40321
NCARB Certificate
LEED Green Associate

YEARS WITH APEXX
8 years
Maxim D. Nasab, AIA, NCARB
Bridge Architect
US 101/Prado Road Interchange • City of San Luis Obispo • July 2024 • 129 Dan has more than 40 years of experience in traffic/electrical engineering specializing in traffic signals, lighting, and transportation electrical systems. He has completed traffic/electrical engineering plans, specifications, and estimates (PS&E) for more than 1,200 transportation projects in over 100 jurisdictions, including County of San Luis Obispo and Caltrans District 5.

Select Project Experience
SR 217/HOLLISTER AVENUE INTERCHANGE, City of Goleta, CA; Electrical Design Task Manager.

Dan was responsible for managing all electrical design activities related to preparation of PS&E for traffic signals and lighting. This project is to convert the existing diamond interchange to a roundabout interchange. This project also included improvements on Hollister Avenue between SR 217 and Kellogg Avenue.

SCCRTC HIGHWAY 1 AUXILIARY LANES, Caltrans – Santa Cruz County, CA; Electrical Design Task Manager. Dan was responsible for managing all electrical design activities related to preparation of PS&E for traffic signals, lighting, ramp metering, traffic monitoring station, camera system, flashing beacons, and electric service for irrigation controllers. The project is to widen Highway 1 to include auxiliary lanes between interchanges from Soquel Drive to Freedom Boulevard.

AVILA BEACH DRIVE/HWY 101 ROUNDABOUT INTERCHANGE, San Luis Obispo County, CA; Electrical Design Task Manager. Dan was responsible for managing all electrical design activities related to preparation of PS&E for roundabout lighting and park-n-ride lot lighting. This project is to construct a roundabout at the US 101 SB off-ramp intersection to improve traffic operations at the US 101/Avila Beach Drive interchange. This project also included construction of a park- n-ride lot on the southwest quadrant of the interchange.

US 50/EL DORADO HILLS BLVD-LATROBE ROAD INTERCHANGE, El Dorado County, CA; Electrical Design Task Manager. Dan was responsible for managing all electrical design activities related to preparation of PS&E for traffic signals, lighting, sign illumination, and ramp metering.

This multi-phase project included widening of US 50 to add HOV lanes, widening of El Dorado Hills Blvd-Latrobe Road under US 50, widening of on and off-ramps, as well as realignment of Saratoga Way.

SR120/MCKINLEY AVENUE INTERCHANGE, City of Manteca, CA; Electrical Design Task Manager. Dan was responsible for managing all electrical design activities related to preparation of PS&E for traffic signals, lighting, and ramp metering. The project will build a new partial cloverleaf interchange that includes on-and off-ramps, two new ramp bridges, auxiliary lanes on SR120, ramp metering, and roadway improvements on McKinley Avenue, including Class II bike lanes.

EXPERIENCE
40 years

EDUCATION
MS, Transportation
Engineering, University of
California, Berkeley
BS,Civil Engineering, California
State University, Fresno

REGISTRATION
Professional Engineer -
CA #44611
Traffic Engineer - CA #TR1471
Professional Traffic Operations
Engineer, ITE, #211

YEARS WITH
BENNETT+Y&C
27 years
Daniel Yau, PE, TE, PTOE
Signals & Lighting
US 101/Prado Road Interchange • City of San Luis Obispo • July 2024 • 130 Kin Chan has 33 years of experience in traffic/electrical engineering, specializing in traffic signals, lighting, and intelligent transportation systems. He has completed traffic/electrical engineering plans, specifications, and estimates (PS&E) for more than 1,000 transportation projects for numerous public agencies, including County of San Luis Obispo and Caltrans District 5.

Select Project Experience
SR 217/HOLLISTER AVENUE INTERCHANGE, City of Goleta, CA; Lead Electrical Design Engineer.

Kin was responsible for preparing PS&E for traffic signals and lighting. This project is to convert the existing diamond interchange to a roundabout interchange. This project also included improvements on Hollister Avenue between SR 217 and Kellogg Avenue.

SCCRTC HIGHWAY 1 AUXILIARY LANES, Caltrans – Santa Cruz County, CA; Lead Electrical Design Engineer. Kin was responsible for preparing PS&E for traffic signals, lighting, ramp metering, traffic monitoring station, camera system, flashing beacons, and electric service for irrigation controllers.

The project is to widen Highway 1 to include auxiliary lanes between interchanges from Soquel Drive to Freedom Boulevard.

AVILA BEACH DRIVE/HWY 101 ROUNDABOUT INTERCHANGE, San Luis Obispo County, CA; Lead Electrical Design Engineer. Kin was responsible for preparing PS&E for roundabout lighting and park-n-ride lot lighting. This project is to construct a roundabout at the US 101 SB off-ramp intersection to improve traffic operations at the US 101/Avila Beach Drive interchange. This project also included construction of a park- n-ride lot on the southwest quadrant of the interchange.

US 50/EL DORADO HILLS BLVD-LATROBE ROAD INTERCHANGE, El Dorado County, CA; Lead Electrical Design Engineer. Kin was responsible for preparing PS&E for traffic signals, lighting, sign illumination, and ramp metering. This multi-phase project included widening of US 50 to add HOV lanes, widening of El Dorado Hills Blvd-Latrobe Road under US 50, widening of on and off-ramps, as well as realignment of Saratoga Way.

SR120/MCKINLEY AVENUE INTERCHANGE, City of Manteca, CA; Lead Electrical Design Engineer. Kin was responsible for preparing PS&E for traffic signals, lighting, and ramp metering.

The project will build a new partial cloverleaf interchange that includes on-and off-ramps, two new ramp bridges, auxiliary lanes on SR120, ramp metering, and roadway improvements on McKinley Avenue, including Class II bike lanes.

SR 227/PRICE CANYON ROAD INTERSECTION IMPROVEMENTS, San Luis Obispo County, CA; Lead Electrical Design Engineer. Kin was responsible for preparing PS&E for modification of traffic signal and intersection safety lighting. This project was to widen the SR 227/Price Canyon Road intersection to include a southbound right-turn lane.

EXPERIENCE
33 years

EDUCATION
MS, Civil Engineering, San Jose
State University
BS, Civil Engineering, San Jose
State University

REGISTRATION
Professional Engineer -
CA #55391

YEARS WITH
BENNETT+Y&C
27 years
Kin Chan, PE
Signals & Lighting
US 101/Prado Road Interchange • City of San Luis Obispo • July 2024 • 131 Jim has over 30 years of experience in regional multimodal transportation planning, congestion management, multidisciplinary corridor studies, safety studies, transit studies, active transportation studies, operational analyses, transportation and air quality modeling, and performance measure applications. He has managed regional transportation plan/sustainable community strategy updates and general plan circulation element updates; operational traffic studies for state highway infrastructure improvement projects (PSR/PA-ED Phases); corridor studies; active transportation studies; traffic impact fee programs; travel demand modeling; air quality modeling; and transportation operational studies for a variety of clients including Caltrans, MPOs, and various cities and counties in California. He has served on state and regional planning committees and conference panels for transportation air quality conformity, performance measurement, and SB 743, respectively.

Select Project Experience
US 50/LATROBE RD/EL DORADO HILLS BLVD INTERCHANGE PHASE 2B, El Dorado County, CA; Project Manager. Jim’s team prepared the travel forecasts and traffic operations studies for the El Dorado Hills Blvd Interchange Phase 2B. Three eastbound ramp alternatives were analyzed for two horizon years (2027 and 2047). In addition to travel forecasts and operations DKS performed a Level of Traffic Stress for pedestrian and bike travel and a IHSDM Safety analysis of the three design concepts.

EL DORADO HILLS INTERCHANGE AND HOV LANES TRAFFIC OPERATIONS ANALYSIS, El Dorado County, CA; Project Manager. Jim’s team prepared the travel forecasts and traffic operations studies for the El Dorado Hills Interchange and U.S. 50 HOV lanes. Two alternatives under three phasing scenarios were analyzed for two horizon years (2010 and 2030). Travel forecasts and operations to inform design concepts for the reconfiguration of the interchange and identified future impacts and proposed mitigation was developed.

SR 99 WHITELOCK PARKWAY INTERCHANGE PSR-PDS TRAFFIC ANALYSIS, City of Elk Grove, CA; Project Manager. Jim managed the traffic analysis to provide technical support for the PSRPDS phase of the SR 99 Whitelock Interchange Improvement Project in the City of Elk Grove. A detailed operational analysis, evaluation, and finding of the traffic operational performances of 17 study intersections also performed within vicinity of the proposed new interchange for SR-99 at Whitelock Parkway. Three interchange configuration alternatives were evaluated including tight diamond (1A), diverging diamond (2A), and tight diamond with roundabouts (3A). The analysis was performed based on methodologies, assumptions, criteria, and traffic conditions under Cumulative Plus Project scenario.

ATWATER-MERCED EXPRESSWAY (STATE ROUTE 59 BYPASS AND SR 99 INTERCHANGE) PA-ED & PS&E TRAFFIC STUDY, Merced County, CA; Project Manager. Jim managed the development of the travel forecasts and operations for three Atwater-Merced Expressway alignment alternatives including two new interchanges with SR 99 and Santa Fe Road in Merced County. Traffic modeling was used to generate traffic performance information for each alignment alternative as well as inform the interchange configuration design alternatives. Various project phases were analyzed independently which carried through to the PS&E of Phase 1A_Reduced which is now constructed and open to traffic.

EXPERIENCE
34 years

EDUCATION
MS, Geography, University of
California, Santa Barbara, CA
BA, Geography (Honors),
University of California, Santa
Barbara, CA

YEARS WITH DKS
3 years
Jim Damkowitch
Traffic
US 101/Prado Road Interchange • City of San Luis Obispo • July 2024 • 132 Daniel is an experienced transportation engineer and planner with a diverse background in working on projects throughout California. He specializes in data-driven planning for roadways, active modes, transit, site developments, and general plans. Daniel excels in developing, validating, and applying travel demand and economic/behavioral models. He is skilled in micro-simulation and proficient with various transportation analysis software, including VISSIM, VISUM, VISTRO, Synchro/ SimTraffic, TransCAD, Cube/Voyager, ArcGIS, HCS, FREEVAL, and Traffix.

Select Project Experience
PIER AVENUE MULTIMODAL CORRIDOR STUDY, San Luis Obispo County, CA; Traffic Operations and Forecasting Support. DKS is transforming Pier Avenue from an auto-centric design to a multimodal street to better connect the Oceano community with the beach and dunes. The study includes traffic operations analysis, bicycle and pedestrian stress levels, and parking analysis to prioritize safety for pedestrians and cyclists.

HOLIDAY INN EXPRESS TIA REVIEW, City of Santa Maria, CA; Peer Review Lead. Daniel performed a peer review of a Traffic Impact Analysis for a hotel in Santa Maria. The review focused primarily on the VMT analysis.

CALIFORNIA POLYTECHNIC STATE UNIVERSITY (CAL POLY), SAN LUIS OBISPO CAMPUS MASTER PLAN EIR, Cal Poly, San Luis Obispo, CA; Traffic Operations and Forecasting Support.

Daniel performed intersection-level multimodal traffic operations analysis to identify and mitigate impacts under CEQA for the update of the Cal Poly Campus Master Plan.

STOCKTON BLVD CORRIDOR COMPLETE STREETS, City of Sacramento, CA; Traffic Operations and Forecasting Support. Daniel led the traffic engineering study for a 4-mile urban arterial, initially an intercity autoroute, to accommodate various users (pedestrians, cyclists, transit). He used SACOG's regional travel demand model to forecast future demand, assess the impact on parallel routes, and perform VISSIM micro-simulation for a challenging intersection.

SANTA CLARA COUNTY EXPRESSWAY PROGRAM SUPPORT SERVICES, Santa Clara County, CA; Traffic Operations and Forecasting Lead. Daniel was the traffic analysis lead for the Montague Expressway corridor study, providing planning and design services. The project included VISSIM modeling and testing operational improvements.

US 101 HOV LANES PA/ED, Ventura County Transportation Commission, CA; Traffic Operations and Forecasting Support. Daniel led the freeway operations analysis for adding 29 miles of HOV lanes on US 101 through Thousand Oaks and Ventura, using the HCM method and FREEVAL software.

EXPERIENCE
17 years

EDUCATION
MS, Transportation Technology
and Policy, University of
California, Davis
BS, Civil Engineering, California
Polytechnic State University,
San Luis Obispo

REGISTRATION
Professional Traffic Engineer -
CA #2676

YEARS WITH DKS
<1 year
Daniel Block, TE
Traffic
US 101/Prado Road Interchange • City of San Luis Obispo • July 2024 • 133 Sean offers a broad range of analysis skills, including signal timing, traffic operations analysis, transportation system planning, and crash data and safety analysis. Sean works with public agencies to identify and resolve today’s transportation issues and plan for future travel demand.

He is experienced in providing quantitative and qualitative analysis for all mobility methods. He has worked on projects throughout California and Oregon to address the needs of growing traffic, transit, and active mobility demands. Sean is adept at applying various software packages for traffic analysis, including Synchro/SimTraffic, Vissim, ArcGIS, and Cube.

Select Project Experience
SLOCOG US 101 CORRIDOR MOBILITY MASTER PLAN ADDENDUM, San Luis Obispo County, CA; Traffic Operations and Analysis Support. Sean conducted safety and operations analysis for the US 101 Corridor Mobility Master Plan Addendum in 2020. This involved preparing materials for Avila Beach Drive Interchange, US 101 Pismo shoulder lanes, and Shell Beach Streetscape projects.

Sean also provided data inputs for SLOCOG's SB-1 grant application.

PIER AVENUE MULTIMODAL CORRIDOR, San Luis Obispo County, CA; Traffic Operations and Analysis Lead. Sean is developing a corridor plan for Pier Avenue in Oceano, aimed at enhancing bicycle and pedestrian access to the beach. Pier Avenue is a primary access point for the Oceano Dunes State Vehicular Recreation Area, leading to varying demand due to tourist activity. Sean leads alternative concept development driven by stakeholder outreach conducted by DKS in the project study area.

CHURCH STREET ROUNDABOUT FEASIBILITY STUDY, Santa Maria, CA; Traffic Operations and Analysis Lead. Sean led a traffic analysis to assess the feasibility of installing roundabouts at five locations along Church Street in Santa Maria. Using Sidra and HCM methodologies, Sean determined lane requirements and evaluated traffic operations. Each location was assessed for necessary right-of-way for proposed improvements.

I-5/RICHARDS BOULEVARD INTERCHANGE, Sacramento, CA; Traffic Operations and Analysis Lead. Sean leads traffic analysis to evaluate interchange design alternatives. Initial screening via SimTraffic microsimulation determines viability, followed by Vissim analysis of top alternatives for comprehensive impact assessment on local and freeway systems. The project requires extensive coordination between the City and Caltrans to ensure analysis consistency across multiple projects in the study area.

I-5/I STREET INTERCHANGE, Sacramento, CA; Traffic Operations and Analysis Lead. Sean led traffic and safety analysis for the I-5/I Street Interchange redesign in Downtown Sacramento, aiming to improve local transit, bicycle, and pedestrian access to Sacramento Valley Station.

Unique design considerations required Vissim microsimulation to compare alternatives and ensure operational feasibility amidst physical constraints.

EXPERIENCE
10 years

EDUCATION
BS, Civil Engineering, Cal Poly
San Luis Obispo

REGISTRATION
Engineer in Training -
CA #146088

YEARS WITH DKS
10 years
Sean Carney, EIT
Traffic
US 101/Prado Road Interchange • City of San Luis Obispo • July 2024 • 134 Lillian has been the Managing Senior Associate of Hamner, Jewell & Associates since 1990, and since 1979 has spent her entire career in real estate. Lillian has functioned in a primary role in residential, commercial, and agricultural land negotiations and acquisitions for cities, counties, special districts, water agencies, utilities, and redevelopment agencies. A resident of Arroyo Grande in San Luis Obispo County, Lillian is very familiar with the area and has managed projects that include federally funded freeway interchange projects, the acquisition of sites for federally funded transportation centers, Metrolink stations, and transit maintenance facility sites, as well as several park acquisitions, many roadway and public trail projects. She also managed the acquisition and relocation services in conjunction with approximately 200 parcel acquisitions for the California High Speed Rail Project.

Over the years she has had extensive specialized training in the governmental real estate sector through professional courses and seminars offered by the International Right of Way Association, Caltrans, FHWA, FRA, HUD, CRLA (continuing legal education) and through the Ventura Center for Dispute Resolution. Courses have also included Understanding Environmental Contamination in Real Estate Transactions. Lillian has a lengthy resume of experience in providing acquisitions, sales of excess lands, and interim property management in conjunction with transportation, public works, housing, and redevelopment projects. She is a “hands-on” manager who closely monitors project progress and maintains direct relationships with our clients and project teams.

Qualifications and Capabilities
• Federal Uniform Act
• State Government Code
• Eminent domain requirements
• Caltrans policies and procedures
• Organizational leadership and project management
• Drafting relocation guidelines, plans, and cost estimates • Central Coast, Central Valley, and other California real estate Relevant Project Experience
• Freeway interchange projects
• Fee purchases of vacant and improved properties
• Easement acquisition for pipelines and street widening • Sidewalk and bike path projects
• Project planning, budgetary estimates and right of way data sheets • Securing rights of entry
• Relocation Assistance
• Acquisition of sites for federally funded transportation • Transit maintenance facility sites
• Park acquisitions
• Roadways and bridges

EXPERIENCE
44 years

EDUCATION
BA, University of California,
Santa Barbara

REGISTRATION
Corporate Real Estate Broker
Licensed Real Estate Broker:

DRE #00704804

YEARS WITH HAMNER,

JEWELL & ASSOCIATES
34 years
Lillian D. Jewell
Right-of-Way Acquisition
US 101/Prado Road Interchange • City of San Luis Obispo • July 2024 • 135 J.T. joined Hamner, Jewell & Associates in January 2017. Over the years, he has progressed to increasingly responsible positions, and is a well-rounded, cross trained Right of Way Agent and Project Manager with excellent communication skills, technical skills, and organizational skills. He is thoroughly experienced with public right of way acquisition projects from inception through completion, including initial property identification and research and completing Right of Way Data Sheets and budgetary estimates for projects small and large primarily throughout San Luis Obispo County, where he also lives. J.T. has worked closely with the Consor team on the early stages of the Atwater Merced Expressway Project, a large scale highway project involving federal requirements and Caltrans oversight. He has also worked with Consor on several federally funded bridge projects in San Luis Obispo and Merced Counties.

J.T. holds a California Real Estate License and Notary Public Commission, as well as a Right of Way Agent designation from the International Right of Way Association. His active, on-the-job training has been supplemented by attending specialized professional level courses offered through the IRWA, Caltrans, and FHWA. J.T.’s interpersonal skills lend themselves to a skillful approach to property owner negotiations. Through these negotiations, he has acquired fee title, permanent and temporary easements for federally funded and local agency projects.

J.T. has also assisted public agency clients with preparing Caltrans Right of Way Certification forms.

Additionally, he has completed relocation plans for temporary relocations prompted by housing rehabilitation projects. J.T. has excellent aptitude, judgment, and presentation skills, excellent communication skills, both verbal and in writing, and top-notch technical skills.

Qualifications and Capabilities
• Right of Way Acquisition, federally funded Caltrans oversight & Local Agency • Streets and Highways, Water and Wastewater Systems
• Full & Partial Acquisitions, Fee & Easements, Temporary Easements • Right of Way Data Sheets & Budgetary Analysis
• Relocation Impact Analysis and Relocation Plans
• Relocation Assistance per State and Uniform Act Guidelines • Waiver Valuations
• Williamson Act Compliance
• Development Conditions/Required Dedications
Relevant Project Experience
• Prado Interchange RW Data Sheets, City of San Luis Obispo, CA • Chorro Murray Sewerline Project, City of San Luis Obispo, CA • Two Federally-Funded Bridge Replacement Projects, City of Atascadero, CA • Recycled Water Conveyance Project/Several condition of development transportation and utility projects, City of Paso Robles, CA
• Atwater Merced Expressway and Several Federally Funded Bridge Projects, Merced County, CA • Multiple Street Improvement and Roundabout Projects, City of Dinuba, CA • Several Federally Funded Road Widening projects including business relocation assistance, City of Fresno, CA

EXPERIENCE
7 years

EDUCATION
MA, Education, San Diego
State University
BA, Journalism, San Diego
State University

REGISTRATION
California Real Estate License:

DRE #02109021

YEARS WITH HAMNER,

JEWELL & ASSOCIATES
7 years
J.T. Katavich
Right-of-Way Acquisitions
US 101/Prado Road Interchange • City of San Luis Obispo • July 2024 • 136 Stephen Myrick joined Hamner, Jewell & Associates in 2023, bringing with him several years of commercial and residential real estate experience in San Luis Obispo County. A San Luis Obispo native, he continues to live in south county and has exceptional knowledge and contacts in the area that set the stage for his success in providing right of way acquisition services for local San Luis Obispo County communities. His familiarity with the Central Coast and its real estate market has made him a perfect fit for the right of way industry and boosted him into several important local projects involving right of way acquisition on state, local, and federally-funded projects that have included a sidewalk infill project in the City of San Luis Obispo, a pending federally funded bridge replacement project in Arroyo Grande, and he has assisted with the City of San Luis Obispo MidHiguera Bypass Project, among other projects.

Prior to joining Hamner, Jewell & Associates, Stephen gained general real estate experience through his work with Elite Real Estate Group and with Richardson Properties. In both capacities, he worked to assist clients with leasing, buying, and selling real estate on the Central Coast. His work was primarily focused on commercial real estate transactions involving a variety of property types including retail, office, medical, land, development, industrial, and investment properties. He was able to develop strong skills in negotiation, marketing, contract management, and an overall strong understanding of the local real estate market.

Prior to entering the real estate field, Stephen was a first responder in the San Luis Obispo area after completing his service to our country in the US Military, where he was trained as a medic.

Qualifications and Capabilities
• San Luis Obispo County communities
• Residential and commercial real estate
• California lease and rental agreement laws
• Contract law
• Appraisal principles and practices
• Excellent written and verbal communication skills
• Establishing relationships; negotiation skills
• Excellent technical skills
Relevant Project Experience
• Mid-Higuera Bypass Project, City of San Luis Obispo, CA • Prado Road Bridge Widening Project, City of San Luis Obispo, CA • Traffic Way Bridge Project, City of Arroyo Grande, CA • South Higuera Sidewalk Project, City of San Luis Obispo, CA • Kings County Fire Station Site Acquisition, Kings County, CA

EXPERIENCE
4 years

EDUCATION
BS, Health Sciences and
Public Health Systems, Kaplan
University, Davenport, IA
AS, General Education,
Colorado Technical University,
Colorado Springs, CO

REGISTRATION
California Real Estate DRE
#02105416

YEARS WITH HAMNER,

JEWELL & ASSOCIATES
1 year
Stephen Myrick
Right-of-Way Acquisition
US 101/Prado Road Interchange • City of San Luis Obispo • July 2024 • 137 Chris has 28 years of experience working on a number of projects involving highway and roadway drainage, water supply issues, and hydraulic modeling of rivers and floodplains. He has a wide range of field experience in environmental and hydraulic and hydrologic projects. His typical projects include floodplain analysis and delineation, drainage design, bridge hydraulics, scour analyses, wetland impact mitigation, water quality assessment, and water rate measurement and availability. His experience includes working with and delivering on-call transportation projects for public agency clients, including the City of San Luis Obispo.

Select Project Experience
PRADO ROAD OVERCROSSING PROJECT, City of San Luis Obispo, CA; Project Manager. The City of San Luis Obispo proposes to extend Prado Road over US 101 to connect with Dalidio Drive to the north. The project limits are located within the Federal Emergency Management Agency’s (FEMA) regulatory floodplain, with flooding sources including San Luis Obispo Creek, Prefumo Canyon Creek, and Froom Creek. Chris worked with the City and oversaw the development the two-dimensional (2D) hydraulic model of the project reach of San Luis Obispo Creek to evaluate the project’s impacts on the floodplain. Work involved evaluating the existing hydraulic conditions based on FEMA design flows, current available data, and the associated Letter of Map Revisions (LOMR) and assessing the proposed conditions based on preliminary interchange improvement configurations. Chris worked closely with the City, guiding the analyses and overseeing the development of the Floodplain Evaluation Report.

LOS OSOS VALLEY ROAD/US 101 INTERCHANGE IMPROVEMENT PROJECT, City of San Luis Obispo, CA; Senior Engineer. The purpose of this project was to perform a floodplain risk assessment and recommend mitigation measures for the proposed improvements to the Los Osos Valley Road/US 101 interchange in the city of San Luis Obispo. The improvements were proposed by the City of San Luis Obispo, Caltrans, and the Federal Highway Administration. Chris performed studies for the design of fish passage enhancement, which included the design of facilities through which both adult and juvenile steelhead could pass. He also prepared the Floodplain Evaluation Report and Bridge Design Hydraulic Study Report.

RIVER GROVE BRIDGE REHABILITATION PROJECT, San Luis Obispo County, CA; Supervising Engineer. Chris prepared the Bridge Design Hydraulic Study Report to present the design flow characteristics for the existing bridge and the proposed rehabilitation bridge. He reviewed available hydrologic data and prepared a hydrologic study; a hydraulic analysis to determine the design water surface elevations and flow velocities for the existing and proposed rehabilitation bridges over Estrella River; a scour analysis to estimate potential scour depths for the proposed bridge condition; and scour countermeasure analyses and recommendations for the proposed bridge rehabilitation.

EXPERIENCE
28 years

EDUCATION
BASc, Civil & Environmental
Engineering, University of
British Columbia
AAsc, Civil Engineering, College
of New Caledonia

REGISTRATION
Professional Engineer -
CA #64807
Qualified SWPPP Developer/
Practitioner (QSD/P) -
CA #618

YEARS WITH HDR
23 years
Chris Sewell, PE, QSD/P
W a t e r R e s o u r c e s , F l o o d p l a i n , D r a i n a g e D e s i g n , Drainage Report
US 101/Prado Road Interchange • City of San Luis Obispo • July 2024 • 138 Jeanette has more than 10 years of experience performing hydrologic and hydraulic modeling of watersheds, rivers, and floodplains for tasks such as channel improvements, fish passage design, hydraulic structure analysis, stormwater drainage, sea level rise, and floodplain delineation. Her modeling experience includes HEC-RAS, HEC-HMS, ICM, PC SWMM, and Flow 3D. She also has experience with ArcGIS and R for tasks such as data preparation, results post-processing, and specialized analysis.

Select Project Experience
PRADO ROAD OVERCROSSING PROJECT, City of San Luis Obispo, CA; Associate Engineer. The City of San Luis Obispo proposes to extend Prado Road over US 101 to connect with Dalidio Drive to the north. The project limits are located within the Federal Emergency Management Agency’s (FEMA) regulatory floodplain, with flooding sources including San Luis Obispo Creek, Prefumo Canyon Creek, and Froom Creek. Jeanette developed a HEC-RAS two-dimensional (2D) hydraulic model of the project reach of San Luis Obispo Creek to evaluate the project’s impacts on the floodplain. Work involved evaluating the existing hydraulic conditions based on FEMA design flows, current available data, and the associated Letter of Map Revisions (LOMR) and assessing the proposed conditions based on preliminary interchange improvement configurations. Jeanette was also responsible for analyzing and calibrating split-flows, identifying level of impacts, and documenting the results in the Floodplain Evaluation Report.

STATE ROUTE 41 EXPANSION PROJECT, Madera County, CA; Associate Engineer. The County of Madera, in cooperation with Caltrans District 6, proposes to expand SR 41 from 0.4 miles south of the Avenue 11 undercrossing to 0.4 miles north of Avenue 15, about 15 miles east of the city of Madera and 12 miles north of the city of Fresno. Jeanette was responsible for hydraulic modeling and assessed existing hydraulics and hydrology so that appropriate drainage can be proposed for Caltrans’ approval. She analyzed the existing conditions, created watershed exhibits and summaries of results, and provided recommendations for drainage sizing and conceptual input. Jeanette created HEC-RAS 2D and HEC-HMS models and provided the models to a third-party developer’s engineers for existing flow results. She was also responsible for updating models and exhibits according to the third-party developer’s engineers’ recommendation and input on what should be included in the analyses.

HIGHWAY 1 IN SONOMA COUNTY PM 15.1 TO 15.8, Caltrans District 4, Sonoma County, CA; Associate Engineer. The project was to perform erosion control analysis at Gleason Beach for the Highway 1 Relocation Project. Jeanette analyzed coastal conditions including the effects of storm frequency, wave run-up, and sea level rise to determine the rate of bluff retreat and map the predicted shoreline for the years 2050 and 2100. The study included a statistical analysis of available data and a sensitivity analysis of the predictive parameters used.

EXPERIENCE
10 years

EDUCATION
MS, Civil & Environmental
Engineering, University of
California, Davis
BS, Civil & Environmental
Engineering, University of
California, Davis

YEARS WITH HDR
5 years
Jeanette Newmiller
W a t e r R e s o u r c e s , F l o o d p l a i n , D r a i n a g e D e s i g n , Drainage Report
US 101/Prado Road Interchange • City of San Luis Obispo • July 2024 • 139 Analette has 31 years of experience in the fields of water quality, stormwater management and hydraulics. She has been involved in hundreds of Caltrans projects statewide for drainage and stormwater best management practices (BMP) design. Her experience ranges from large-scale projects to local infrastructure improvements and low-impact development (LID). Analette also has trained local agencies and Caltrans staff on LID and Construction General Permit (CGP) requirements. Her experience negotiating stormwater permit compliance with the Regional Water Quality Control Boards (RWQCB) has helped her develop strong working relationships with RWQCB staff and facilitates efficient permitting and compliance.

Select Project Experience
JACK CREEK ROAD AT PASO ROBLES CREEK BRIDGE REPLACEMENT PROJECT, San Luis Obispo County, CA; Hydraulics Project Manager. San Luis Obispo County is proposing to replace the existing timber bridge on Jack Creek Road with a new concrete bridge. The project area is located approximately 4.3 miles west of US 101 and 0.2 mile north of State Route (SR) 46. HDR was responsible for the post-construction BMP design, Roadway Drainage Hydrologic and Hydraulic Memorandum, and the Phase I Initial Site Assessment. Analette oversaw the preparation of the 65%, 95% and Final Submittal for LID BMP Design Plans, Specifications, and Estimates (PS&E), as well as the Roadway Drainage Hydrology and Hydraulics Memorandum for the 65%, 90% and Final PS&E.

NORTHBOUND INTERSTATE 280 OFF-RAMP TO FOOTHILL EXPRESSWAY PROJECT, Cupertino and Los Altos, CA, Santa Clara Valley Transportation Authority (VTA); Supervising Engineer. VTA proposes to widen the existing northbound Interstate 280 (I-280) exit to Foothill Expressway from one lane to two lanes in order to improve traffic operations in the section of northbound I-280 between the two-lane branch connector from SR 85 and the Foothill Expressway off-ramp in the cities of Cupertino and Los Altos. Analette was responsible for preparation of the Stormwater Data Report, as well as the water pollution and erosion control PS&E. The recommended BMPs met the design requirements of Caltrans, VTA, Santa Clara Valley Urban Runoff Pollution Prevention Program, and the San Francisco Bay RWQCB.

YERBA BUENA ISLAND SOUTHGATE ROAD REALIGNMENT, San Francisco, CAMTC-BATA & San Francisco County Transportation Authority; Supervising Engineer. The project was for the realignment of Southgate Road and Hillcrest Road as well as the construction of the previously approved eastbound off-ramp south of I-80 and bicycle/pedestrian facilities. Analette oversaw the hydrologic and hydraulic analyses; Drainage Report; and the water pollution control and erosion control PS&E.

EXPERIENCE
31 years

EDUCATION
BS, Civil Engineering,
University of California, Davis

REGISTRATION
Professional Civil Engineer -
CA #55279
Qualified SWPPP Developer
and Practitioner (QSD/P) -
CA #178
QSD/P Trainer of Record (ToR) -
CA #178

YEARS WITH HDR
17 years
Analette Ochoa, PE, QSD/P, ToR
Stormwater Treatment, SWDR, Erosion Control
US 101/Prado Road Interchange • City of San Luis Obispo • July 2024 • 140 Andrew has 16 years of experience in civil and environmental engineering studies. He develops reports and presentations in the fields of water quality and stormwater, including preparing Water Quality Assessment Reports, Stormwater Data Reports, and Conceptual Stormwater Pollution Prevention Plans (SWPPP), meeting Caltrans and local agency guidelines. He also develops plans, specifications, and estimates (PS&E), and he provides construction support for stormwater and roadway drainage projects. Andrew uses his experience to meet current design regulations for stormwater treatment, low-impact development, and hydromodification management as well as the design of bioretention facilities, media filters, and other treatment devices.

Select Project Experience
STATE ROUTE 178 WIDENING PROJECT, City of Bakersfield, CA and Caltrans District 6; Project Engineer. The project widened State Route 178 in the northeast portion of the City of Bakersfield.

Andrew prepared the Stormwater Data Report for the project.

SOUTH COUNTY CONNECTOR, Stanislaus Council of Governments, Stanislaus County, CA; Water Quality Specialist. Andrew is assisting with the preparation of the Preliminary Hydrology, Floodplain, and Water Quality technical studies for this project. Local and regional investment limitations and the preliminary cost-benefit analysis of the proposed alternatives were provided for this project.

US 101/SR 25 INTERCHANGE – PHASE 1 PROJECT, Santa Clara Valley Transportation Authority, Santa Clara County, CA; Senior Engineer. The Santa Clara Valley Transportation Authority (VTA) proposes to construct a new US 101/SR 25 interchange and modify northbound and southbound on- and off-ramps to US 101 in southern Santa Clara County. Andrew completed the roadway drainage and stormwater treatment calculations and reports for the project, which included performing the design sizing calculations and modeling for the drainage, hydromodification management, and stormwater facilities to meet Caltrans and Santa Clara County’s criteria. Andrew also assisted and provided oversight for completion of the project’s water well replacement studies, preliminary site investigation, and geomorphic assessment.

STATE ROUTE 9 DRAINAGE FACILITIES UPGRADE PROJECT, Caltrans District 5, Santa Cruz County, CA; Senior Engineer. The project proposes to upgrade drainage facilities at 16 locations on SR 9 in Santa Cruz County from PM 0.09 to PM 7.53. This project was initiated by Pete Riegelhuth and the District 5 NPDES Unit as a result of a regulatory order from the Central Coast RWQCB.

Andrew assisted with the development of the PS&E phase Stormwater Data Report.

EXPERIENCE
16 years

EDUCATION
BS, Environmental
Engineering, University of
California, Riverside

REGISTRATION
Engineer-in-Training -
CA #61526

YEARS WITH HDR
16 years
Andrew P. Chin, EIT
Stormwater Treatment, SWDR, Erosion Control
US 101/Prado Road Interchange • City of San Luis Obispo • July 2024 • 141 Chris manages and prepares CEQA and NEPA documentation in the California central coast region and technical air quality, greenhouse gas emissions, and noise analyses for public agencies and private sector clients throughout California. He has 16 years of planning experience with an emphasis on environmental planning and technical environmental analysis. His experience includes a wide range of technical environmental and planning studies, including infrastructure development projects, urban land redevelopment projects, general plans and specific plans, solar power facilities and other energy projects, waste and wastewater management facilities, and other long-range planning projects.

Select Project Experience
PRADO ROAD-US 101 INTERCHANGE PROJECT: CALTRANS PEAR, CEQA/NEPA ENVIRONMENTAL TECHNICAL STUDIES, AND IS-MND/EA, City of San Luis Obispo, CA; Environmental Project Manager. Chris managed preparation of technical studies and an IS-MND/ EA for the Prado Road-U.S. 101 Interchange Project. The project will provide connectivity between the existing and planned neighborhoods east and west of U.S. 101 and resolve operational deficiencies on State and City facilities for all transportation modes. Rincon worked with the City of San Luis Obispo and Caltrans staff to prepare environmental technical studies in conformance with Caltrans’ Standard Environmental Reference, including a Natural Environment Study, Archaeological Survey Report, Historic Resources Evaluation Reports, Historic Property Survey Reports, Noise Study Report, Air Quality and GHG technical analyses, Community Impact Analysis, Visual Impact Analysis and Water Quality Report.

SAN YSIDRO ROAD/NORTH JAMESON LANE/US 101 ROUNDABOUT PROJECT, CALTRANS NEPA ENVIRONMENTAL TECHNICAL STUDIES AND CEQA ANALYSIS, Santa Barbara County, CA; Project Manager. Chris managed preparation of technical studies and an EIR Addendum for the San Ysidro Road/North Jameson Lane/U.S. 101 Roundabout Project. Rincon worked with County of Santa Barbara, City of Santa Barbara, Caltrans staff, and the contract engineer to prepare environmental technical studies in conformance with Caltrans’ SER for each roundabout, including Natural Environment Study-Minimal Impact (NES-MI) reports, Archaeological Survey Reports (ASR), Historic Resources Evaluation Reports (HRER), Historic Property Survey Reports (HPSR), Initial Site Assessments (ISA), Noise Studies, Air Quality and GHG analyses, Community Impact Analyses (CIA), Visual Impact Analyses (VIA) and Water Quality Reports.

US 101/CLARK AVENUE INTERCHANGE IMPROVEMENTS PROJECT PEAR, Santa Barbara County, CA; Project Manager. Chris oversaw preparation of a Preliminary Environmental Analysis Report (PEAR) in accordance with the Caltrans PEAR Manual, in support of a PSR for the Clark Avenue Northbound Ramps at U.S. Highway 101 Interchange Improvements Project. The project proposes to construct a new wide diamond configuration of the U.S. 101 northbound on- and offramps and signalize the intersection with Clark Avenue. The PEAR was used to document the issues that are anticipated to be addressed in the NEPA and CEQA documentation and the assumptions that were used to anticipate those issues.

STATE ROUTE 227 OPERATIONS ANALYSIS: ENVIRONMENTAL CONSTRAINTS ANALYSIS, San Luis Obispo Council of Governments, San Luis Obispo County, CA; Project Manager. Chris served as Project Manager for an Environmental Constraints Analysis for traffic improvements, including road widening, identified along a 1.3-mile segment of State Route (SR) 227, Broad Street, and Los Ranchos Road. The project corridor also included a segment of the Union Pacific Railroad east of Edna Road and north of Biddle Ranch Road.

EXPERIENCE
16 years

EDUCATION
MESM, Conservation Planning,
Bren School of Environmental
Science & Management,
University of California, Santa
Barbara
BA, Psychology, Brandeis
University

YEARS WITH RINCON
16 years
Chris Bersbach
Environmental Permitting
US 101/Prado Road Interchange • City of San Luis Obispo • July 2024 • 142 Colby is a Principal and Senior Ecologist with Rincon Consultants. He has 26 years of professional experience as a botanist, ecologist, wetlands specialist, and biological sciences educator and researcher. His duties at Rincon include biological field surveys for special status species, habitat and plant community mapping, wetlands assessments, biological resources analyses, construction and mitigation monitoring, conservation planning, regulatory compliance, and the preparation of biological reports, environmental documents and permit applications in support of California Environmental Quality Act (CEQA), National Environmental Policy Act (NEPA), Porter-Cologne Water Quality Control Act, California Fish and Game Code, California Coastal Act, Clean Water Act, Rivers and Harbors Act of 1899, and State and federal Endangered Species Acts.

Select Project Experience
PRADO ROAD-US 101 INTERCHANGE PROJECT: CALTRANS PEAR, CEQA/NEPA ENVIRONMENTAL TECHNICAL STUDIES, AND IS-MND/EA, City of San Luis Obispo, CA; QA/ QC Biological Resources. Colby provided oversight and QA/QC for the preparation of technical studies and an IS-MND/EA specific to biological resources for the Prado Road-U.S. 101 Interchange Project. The project will provide connectivity between the existing and planned neighborhoods east and west of U.S. 101 and resolve operational deficiencies on State and City facilities for all transportation modes. Rincon prepared the PEAR for the interchange project and worked with the City of San Luis Obispo, Caltrans staff, and project engineer to prepare environmental technical studies in conformance with Caltrans’ Standard Environmental Reference, including a Natural Environment Study, Archaeological Survey Report, Historic Resources Evaluation Reports, Historic Property Survey Reports, Noise Study Report, Air Quality and GHG technical analyses, Community Impact Analysis, Visual Impact Analysis and Water Quality Report.

WATER RESOURCE RECOVERY FACILITY PROJECT, City of San Luis Obispo, CA; Principal Biologist and Regulatory Specialist. Colby provided strategic regulatory planning support and negotiated permit conditions with the lead agencies as a part of completing an EIR. Rincon prepared the EIR to satisfy the requirements of CEQA-Plus to support application for federal funding under the State Clean Water Revolving Fund. Rincon provided expertise and advice on probable future regulatory conditions that could be attached to a potential cooling wetland option to assist the City in its decision-making process on that component of the project.

JOHNSON AVENUE EMERGENCY PROJECT, City of San Luis Obispo, CA; Principal-in-Charge. The Rincon team provided environmental consulting services to the City for this creek bank stabilization project. Rincon completed resource agency notifications, a pre-construction survey, aquatic species relocation, WEAP trainings, archaeological monitoring, biological monitoring, and a project completion report and NOC for the emergency repair activities that were conducted for the first phase of the project in 2022. Rincon then completed these again for the emergency work for the second/permanent phase of this project in 2023, which also include preparation of a HMMP to describe all impacts and present an approach to accomplishing compensatory mitigation for both phases.

EXPERIENCE
26 years

EDUCATION
MS, Botany, California State
University, Chico
BS, Ecology and Evolution,
University of California, Santa
Barbara

CERTIFICATION/

REGISTRATION
Certified Ecologist – Ecological
Society of America
California Rapid Assessment
Method – CRAM.org
Wetland Delineation Training –
Richard Chinn Env.

PERMITS
Rare, Threatened, and
Endangered Plant Voucher
Collecting Permit No. 2081(a)-
23-081-V – CDFW

YEARS WITH RINCON
16 years
Colby J. Boggs
Environmental Permitting
US 101/Prado Road Interchange • City of San Luis Obispo • July 2024 • 143 Michael Tom is a Supervising Biologist with Rincon’s biological resources group. Michael has 14 years of experience conducting general and focused surveys for a variety of plant and animal species. He is proficient in maintaining herpetology collections and providing assistance with a number of vertebrate and invertebrate species. Michael has working knowledge and training with the fauna and flora of the central coast, San Joaquin Valley, and desert regions of California. He has also received specific training in survey protocols, habitat requirements and natural histories of the California red-legged frog (CRLF) and desert tortoise. Michael has prepared and managed the preparation of documents to support Section 7 and Section 10 consultation with the U.S. Fish and Wildlife and National Marine Fisheries Services as well as 2081 Incidental Take Permit applications under the California Endangered Species Act. Michael has also been authorized under and implemented measures in issued Biological Opinions and 2081 Incidental Take Permits.

Select Project Experience
PRADO ROAD-US 101 INTERCHANGE PROJECT: CALTRANS PEAR, CEQA/NEPA ENVIRONMENTAL TECHNICAL STUDIES, AND IS-MND/EA, City of San Luis Obispo, CA; Supervising Biologist. Michael oversaw the preparation of technical studies and an IS-MND/EA specific to biological resources for the Prado Road-U.S. 101 Interchange Project. The project will provide connectivity between the existing and planned neighborhoods east and west of U.S. 101 and resolve operational deficiencies on State and City facilities for all transportation modes.

SAN LUIS RANCH SPECIFIC PLAN PROJECT EIR, City of San Luis Obispo, CA; Biologist. Michael prepared the Biological Resources section of the San Luis Ranch Project Specific Plan EIR on behalf of the City of San Luis Obispo. The 131-acre project site represented a key development area for the City, identified in the Land Use and Circulation Element Update. The proposed project included a Specific Plan, General Plan Amendment, and Development Plan for a 131-acre project site, including annexation of the site into the City of San Luis Obispo. This Specific Plan included a mixture of residential, commercial, office, and hotel uses, with a portion of the site preserved for agriculture and open space uses.

WASTEWATER TREATMENT PLAN REDUNDANCY PROJECT CEQA TECHNICAL STUDIES, Oceano, South San Luis Obispo County Sanitation District; Biologist. The South San Luis Obispo County Sanitation District Redundancy Project involves the construction and operation of backup infrastructure at the District’s wastewater treatment facility in Oceano. In support of Clean Water State Revolving Fund and United States Department of Agriculture funding pursuits for the project, Rincon prepared technical studies compliant with CEQA-Plus and NEPA requirements.

Technical studies include an Environmental Report for Categorical Exclusion, a Federal Clean Air Act Conformity Analysis, a Cultural Resources Assessment, and a Biological Evaluation. Rincon is also coordinating with U.S. Department of Agriculture staff to facilitate the environmental review process and receive a Biological Opinion from United States Fish and Wildlife Service for impacts to California red-legged frog.

ON-CALL ENVIRONMENTAL DOCUMENT & DOCUMENTATION SERVICES CALTRANS DISTRICT 5 — CENTRAL CALIFORNIA STATE ROUTE 46 CORRIDOR IMPROVEMENTS PROJECT, San Luis Obispo County, CA; Biologist. Michael served as a Designated Biologist for the project and implemented tasks including pre-construction surveys, biological monitoring during geotechnical investigations pursuant to the USFWS BO and 2081 ITP.

EXPERIENCE
14 years

EDUCATION
MS, Biological Sciences,
California Polytechnic State
University, San Luis Obispo
BS, Ecology & Systematic
Biology, Concentration in
Wildlife Biology, California
Polytechnic State University,
San Luis Obispo

YEARS WITH RINCON
14 years
Michael Tom
Environmental Permitting
US 101/Prado Road Interchange • City of San Luis Obispo • July 2024 • 144 Brian has over 38 years of experience in multimodal transportation planning, traffic engineering, and contextual roadway design. He has planned and designed roundabouts since the late 1990s and is presently leading efforts for new national roundabout guidance: A Guide for Roundabouts.

He has performed location design and engineering evaluations for a variety of corridor studies and environmental impact review documents across the US and in the California central coast. He has actively supported projects within California for over 25 years, including extensive coordination with cities, counties, and Caltrans. Brian has been a trusted advisor to Caltrans, including supporting integrating roundabouts, Highway Design Manual review, staff training, and peer-topeer support in developing the Intersection Evaluation Control (ICE) policy directive.

Brian is a nationally recognized leader in interchange planning and design and has been:
• A roundabout and Highway Safety Manual trainer to Caltrans District and Headquarters staff • An advisor to Caltrans in developing Traffic Operations Policy Directive 13-02 Intersection Control Evaluation (ICE)
• A reviewer/contributor to the roundabout elements of the Highway Design Manual (HDM) Select Project Experience
US 101/AVILA BEACH INTERCHANGE, San Luis Obispo County, CA; Project Manager/ICE Lead.

Brian directed roundabout design activities to address safety and traffic operations performance issues at the US 101/Avila Beach Drive interchange. He oversaw the traffic operations sensitivity analyses, roundabout layout at the south bound ramp terminal intersection. The roundabout design formed the basis for the associated ICE and Caltrans project approval. The project is in PS&E and Brian was engaged in peer review of preliminary plans and led efforts on construction sequencing and staging.

I-80/ASHBY AVENUE INTERCHANGE PROJECT, Emeryville, CA; Project Manager/ICE Lead. Brian supported project approval and environmental document (PA&ED) efforts for this complex project.

Specifically, Brian supported the project team in developing interchange concepts to supplement alternatives completed in earlier studies. Brian developed a range of high-capacity diamond forms (including a diverging diamond) and led intersection control evaluations for Step 1 and Step 2. He led interchange design evaluations that considered a wide range of performance metrics focusing on pedestrian and bicycle facilities, and solution optimization within the constrained environment.

The project is being advanced to final design and PS&E.

I-580/VASCO ROAD INTERCHANGE, Livermore, CA; Traffic Engineer. Brian led the ICE and interchange concept evaluations to replace the existing interchange. Livermore is a growing community with increasing employment and a planned Valley Link rail transit extension to be integrated onto I-580. Contemporary interchange forms are needed to replace the existing rural interchange design. Brian led concept designs for service interchange forms that focused on integrating pedestrians and bicyclists while meeting increased forecast traffic. The forms included diamond and partial cloverleaf forms. A diverging diamond and single loop partial cloverleaf form ranked among the strongest alternative candidates.

EXPERIENCE
38 years

EDUCATION
BS, Civil Engineering, Portland
State University

REGISTRATION
Professional Engineer -

AL, AZ, CO, FL, GA, IA, ID, LA,

MD, MO, MN, MS, MT, NM,

OH, OR, TX, UT, WA, WI, & WY

YEARS WITH SUNRISE

TRANSPORTATION

STRATEGIES
3 years
Brian Ray
Q A / Q C - G e o m e t r i c D e s i g n , Tr a f f i c P e e r R e v i e w L e a d US 101/Prado Road Interchange • City of San Luis Obispo • July 2024 • 145 With over 30 years of experience in marketing and communications, Mary Verdin has established herself as a visionary leader in the industry, being recognized by the Public Relations Society of America, Stevie Awards for Women in Business, Association for Fundraising Professionals, and the Rotary Club. Serving as the President/CEO at Verdin Marketing Ink Co. Since founding the company in December 2003, she has spearheaded its growth into a thriving multimillion-dollar business.

Alongside developing and mentoring a team of 12 employees, Mary leads the agency’s business development programs and nurturing client relationships. Mary has always been dedicated to supporting the community and our local nonprofit organizations, underscoring her commitment to corporate social responsibility. She has received recognition from Public Relations Society of America, Rotary Club, Lumina Alliance, Assn of Fundraising Professionals, Stevie Awards, and Cuesta College.

Select Project Experience
Prado Interchange Environmental Phase Public Outreach, City of San Luis Obispo; Public Outreach and Communications Support. This was a short-term project supporting the City in coordinating and facilitating a public meeting for public input on the Prado Interchange environmental review and to present design options. In addition to the public meeting, Verdin provided media relations services, direct mail, website updates, and ongoing website updates.

Prado Bridge Replacement Project, City of San Luis Obispo; Public Outreach and Communications Support. Working with Wallace Group, Verdin provided media relations services, direct mail, website updates, and ongoing website updates. We also coordinated and facilitated a public meeting to give information and get input on the Prado Bridge replacement.

Coast Corridor Rail Study, San Luis Obispo Council of Governments; Public Outreach and Communications Support. Scope of work included creating a stakeholder database, coordinating a Community Advisory Committee, supporting on Community Open Houses, and collaborating on a countywide survey.

Neighborhood Meetings/Reballoting, City of Paso Robles; Public Relations and Communications Support. Worked with the City to coordinate and facilitate public meetings and materials to educate the community of coming changes to community parks and reballoting. Scope included public meetings facilitation, communications planning and execution, community based social marketing, mailers and collateral development.

EXPERIENCE
30+ years

EDUCATION
Area of Study, Psychology,
University of Califorina, Davis

YEARS WITH VERDIN
21 years
Mary Verdin
Public Outreach
US 101/Prado Road Interchange • City of San Luis Obispo • July 2024 • 146 Since 2010, Ashlee Akers has been an integral part of the account team at Verdin, joining as an account manager before advancing to Vice President/Client Services and ultimately reaching the C-suite as Chief Strategy Officer in 2023. In this role, she supervises and mentors account staff in developing marketing strategies to achieve client goals, and reviews campaign concepts to ensure strategic alignment. Additionally, she consults on major media and public relations plans, builds relationships with senior client personnel, manages budgets and timelines, and actively seeks out new opportunities for our clients’ success.

Ashlee serves on the agency’s Board of Directors and is involved in the community, supporting organizations like Jack’s Helping Hand and the United Way, and contributing to industry organizations serving on the marketing committee of Visit SLO CAL and on the board of the Central Coast Tourism Council.

Select Project Experience
Cultural Arts District Parking Structure, City of San Luis Obispo; Communications Support.

Ashlee provided communications to support the two-year construction of this long-awaited parking structure in downtown SLO. Scope includes downtown business and residents surveys, communications plan and execution through email marketing, social media, and some paid media.

Much of this will be in collaboration with the Arts partners in the district.

Marsh St. Bridge Replacement Project, City of San Luis Obispo; Communications Support.

Ashlee provided communications services to notify residents, businesses and commuters of the construction for the Orcutt Roundabout. Verdin utilized press releases, emails, direct mail and website updates to keep community apprised of detours and progress of the Roundabout construction, through to completion.

Orcutt-Tank Farm Roundabout, City of San Luis Obispo; Communications Support. Ashlee provided communications services to notify residents, businesses and commuters of the construction for the Orcutt Roundabout. Verdin utilized press releases, emails, direct mail and website updates to keep community apprised of detours and progress of the Roundabout construction, through to completion.

LOVR Interchange Project, City of San Luis Obispo; Public Relations and Communications Support.

This project included interfacing with the City, SLOCOG and Caltrans. This two-year effort included research, public relations activities and communications to adjacent residents and businesses, as well as cyclists, commuters and general cross-town traffic.

EXPERIENCE
18 years

EDUCATION
BA, Agricultural Science/
Ag Business, California
Polytechnic State University,
San Luis Obispo

CERTIFICATIONS
Graphic Design Certification
Account Management
Certification

YEARS WITH VERDIN
14 years
Ashlee Akers
Public Outreach
US 101/Prado Road Interchange • City of San Luis Obispo • July 2024 • 147 Clayton has an extensive background in land surveying and civil engineering. He is proficient with a broad range of surveying services relating to boundaries, design, construction, and mapping with many of his professional services being performed to assist in the design of a variety of solar projects. Typical to his experience are corner searches, parcel maps, subdivisions, lot line adjustments, residential construction staking, pipeline staking, line staking, easement surveys and analysis, boundary surveys, topographic mapping, control for aerial mapping and Global Positioning System (GPS).

Select Project Experience
PRADO ROAD BRIDGE WIDENING, San Luis Obispo, CA; Surveying Director. Provided large scale ground-survey mapping in an area that included 2,000 feet of City of San Luis Obispo right-of-way, adjacent frontages and approximately 1,000 feet of creek corridor. The survey mapping included utilities, hardscape, bridge features, sewer and storm structure inverts, striping and found survey monuments. The mapping specific to the bridge structure included a detailed survey of the bridge columns and utilities attached to the bridge structure. He further researched the right-of-way property lines and easements with the mapping area. These items were then plotted and compiled into the survey base map.

SR227 LOS RANCHOS ROAD SURVEY, San Luis Obispo, CA; Surveying Director. For the County of SLO’s Preliminary Engineering of the SR 227/Los Ranchos Road corridor, Clayton directed the survey team tasked with base mapping, digital terrain modelling, topographic surveying, point cloud scanning, photogrammetry, a detailed tree survey and boundary, right-of-way and easement retracement and plotting. Clayton’s team also set primary control points for the proposed improvement project.

AVILA BEACH DRIVE AT US 101 INTERCHANGE, County of San Luis Obispo, CA; Surveying Director. Clayton directed the land surveying services related to the project, including right of way, boundary, easement and topographic mapping and oversaw the use of cutting-edge technology, deploying terrestrial scanners to capture dense point clouds throughout the project area and collect a variety of conventional measurements. The safety of field crew staff and the public is of upmost importance to Clayton and the selection of terrestrial scanning as an approach to field measurement collection kept the field crews safely away from traffic.

EXPERIENCE
23 years

EDUCATION
BS, Civil Engineering, California
Polytechnic State University,
San Luis Obispo, CA

REGISTRATION
Professional Engineer -
CA #65864
Professional Land Surveyor -
CA #8298

YEARS WITH WALLACE
GROUP
23 years
Clayton Bradshaw, PE, PLS
Survey/Right-of-Way Engineering
US 101/Prado Road Interchange • City of San Luis Obispo • July 2024 • 148 In 2016, after graduating from Fresno State University, Luz joined Wallace Group bringing her wellrounded background in geomatics engineering to the Survey Department. Her career has been focused on boundary, subdivision maps, topographic/right-of-way surveys, and the preparation of legal descriptions.

Luz’s field experience includes data acquisition using the latest technology such as laser scanners, Unmanned Aerial Systems (UAS), GNSS, and total stations. Her versatile technical knowledge allows the survey team to deliver reliable and accurate data to Clients.

Select Project Experience
PRADO ROAD BRIDGE WIDENING, County of San Luis Obispo, CA; Land Surveyor. Luz’s support during the easement legal description preparation for this project has been essential. She has been working alongside the senior surveyor, preparing map exhibits and reviewing the legal descriptions document before submittal.

BUCKLEY EXTENSION, County of San Luis Obispo, CA; Land Surveyor. Luz not only helped with the field work during the construction of the Buckley extension, but she also prepared the postconstruction Record of Survey and coordinated with the County to get this recorded.

ANNUAL STREET RESURFACING PHASE 2, City of Marina, CA; Surveying Tech. Completed the office mapping and right-of-way determination of 14 intersections for ADA improvements using point cloud data with Trimble Business Center and Civil 3D.

CITY OF PACIFIC GROVE, CA; Field Crew Member & Project Surveyor. Luz participated as a field crew member in several projects involving field data collection for topographic surveys for the City’s Sewer Master Plan capital improvement projects and the Pacific Grove Urban Division. Today she is helping manage the surveying scope for the City’s Sewer Infrastructure improvements which includes coordinating with the design team, field crew, and drafting personnel.

JDH CORROSION CONSULTANTS, INC., County of San Luis Obispo, CA; Project Surveyor. Utilizing UAS and conventional technology, topographic surveys and high-quality orthographic imagery was collected for 22 working sites. Luz managed the field preparation and performed as both Party Chief and UAS pilot during the field collection. She also elegated and contributed to the office drafting and right-of-way re-establishment, delivering the final product in a timely manner.

DRY CREEK ROAD REPAIRS PHASE 2, City of Paso Robles, CA; Land Surveyor. Luz prepared preand post-construction Record of Surveys, and a right-of-way record of survey along with several easement legal descriptions. Luz also helped with monument perpetuation and setting of the rightof-way and centerline monuments.

EXPERIENCE
8 years

EDUCATION
BS, Geomatics Engineering,
California State University,
Fresno

REGISTRATION
Professional Land Surveyor -
CA #9657

YEARS WITH WALLACE
GROUP
8 years
Luz Garcia, PLS
Survey/Right-of-Way Engineering
US 101/Prado Road Interchange • City of San Luis Obispo • July 2024 • 149 Matt is the Director of Landscape Architecture at Wallace Group. His dedication to the profession and interest in 3D and digital technology has allowed him to lead the discussion about technology use in practice. He has prepared and led landscape design projects from concept to completion, and has created various 3D models, animations and photo simulations for site and city-wide design solutions.

Select Project Experience
GOLDEN HILL/UNION ROAD ROUNDABOUT, Paso Robles, CA; Landscape Architecture Task Manager. Matt was the Landscape Architecture Tasks Manager for the improvements at Union Road and Golden Hill Road intersection. He assisted with the oversight and design of the landscape, irrigation, site hardscape and furnishings. The Wallace Group team provided roadway design and project planning services including but not limited to: field surveys, utility design and coordination, public outreach, storm water quality, drainage, street, landscape, and irrigation. Design support services during construction were also a key component of our service offerings.

US 101/AVILA BEACH DRIVE INTERCHANGE, San Luis Obispo, CA; Landscape Architecture Tasks Manager. As the Landscape Architecture Tasks Manager for the operational improvement project at the US 101/Avila Beach Drive interchange Matt assisted with the oversight and design of the landscape, irrigation, and site hardscape and furnishings. The Wallace Group team provided roadway design and project planning services including but not limited to: field surveys, utility design and coordination, public outreach, storm water quality, drainage, street, landscape, and irrigation. Wallace Group is currently working with Caltrans and the contractor on the design support services during construction.

HUER HUERO CREEK BRIDGE AND ROUNDABOUT, Paso Robles, CA; Landscape Architecture Task Manager. As the Landscape Architecture Tasks Manager Matt supported the design of a 600'+ bridge over Huer Huero Creek and a three-leg single lane roundabout in a rural high-speed environment. He provided quality control for the landscape plan set, Caltrans formatted technical specifications, and an itemized cost estimate. Matt coordinated with City and electrical engineer to select appropriate light poles and standards.

BOB JONES BIKE PATH, County of San Luis Obispo, CA; Director. As Director, Matt is overseeing the landscape architectural improvements for the Bob Jones Bike Path, which is a 4.5-mile extension of the existing trail that connects from Avila Beach at Ontario Road to the Octagon Barn.

Understanding how to refine the Bob Jones Trail alignment to maximize user experience while harmonizing the trail with active agricultural operations, a floodplain, and other natural constraints are major aspects of completing this project.

EXPERIENCE
14 years

EDUCATION
Bachelor of Landscape
Architecture, California
Polytechnic State University,
San Luis Obispo, CA

REGISTRATION
Professional Landscape
Architect #6398

YEARS WITH WALLACE
GROUP
1 year
Matt Wilkins, PLA
Landscape Architecture
US 101/Prado Road Interchange • City of San Luis Obispo • July 2024 • 150 Judd has provided consulting services on the coast of California for over 20 years. He is the lead geotechnical engineer and project manager for public works and infrastructure projects on the coast of California. He has worked on several bridge and interchange improvement projects up and down the Highway 101 corridor. Judd is the lead geotechnical engineer and project manager on a consultant team for several Federal Highway Administration Lands Division (FHWA) projects in Nevada. He is also experienced with Caltrans Local Assistance, working with San Luis Obispo County and Santa Barbara County on highway bridge program projects. He is experienced with Caltrans design methods, standard plans and details, and with the AASHTO LRFD Bridge Design Specifications. Judd also teaches soil mechanics laboratory classes part time in the Civil Engineering Department at Cal Poly, San Luis Obispo.

Judd has extensive expertise in geotechnical exploration methods in complicated subsurface conditions. He also specializes in soft ground, mitigation of liquefaction, mechanically stabilized earth walls, reinforced soil slopes, ground improvement, tunneling, rock coring, Select Project Experience
US 101/AVILA BEACH DRIVE INTERCHANGE IMPROVEMENTS, San Luis Obispo County, CA; Geotechnical Engineer and Project Manager. The project includes the design of a roundabout at the intersection of Shell Beach Road with Avila Beach Drive and rerouting southbound on and off-ramps from the highway. Design features include retaining walls, embankments, drainage improvements, stormwater infiltration, and pavement. Retaining walls will provide grade separation under the overcrossing and along the southbound on-ramp. Judd managed the preparation of a Preliminary Geotechnical Design Report, Geotechnical Design Report, and a Foundation Report for the project in accordance with Caltrans guidelines.

TRAFFIC WAY BRIDGE REPLACEMENT, Arroyo Grande, CA; Geotechnical Engineer and Project Manager. Project Manager for the replacement of Traffic Way Bridge, a multi-span bridge with a total length of approximately 210 feet that spans Arroyo Grande Creek. Scour and structure degradation has led to the need to replace the bridge that serves as a main arterial for the city. The new bridge will be a single span structure supported on CIDH pile abutments. Prefabricated girders are planned to support the new bridge structure. Judd managed the exploration and preparation of a Foundation Report for the project in accordance with Caltrans guidelines.

PRADO ROAD BRIDGE, San Luis Obispo, CA; Geotechnical Engineer Senior Project Manager. Judd has worked on this project since 2012 while with a different firm. The Prado Road Bridge replacement at San Luis Obispo Creek involves the replacement of a multi span bridge with a single span bridge supported on cast-in-drilled hole (CIDH) shafts. Preliminary work included subsurface exploration and development of pile design recommendations for the bridge. Other aspects of the project include tiered soldier pile tie-back walls to address scour potential and deep-seated abutments for the proposed structure. Judd is continuing work on the bridge replacement project with Yeh.

HIGHWAY 101 NORTHBOUND/SR46 EAST RAMP IMPROVEMENTS, Paso Robles, CA; Geotechnical Engineer and Project Manager. Project Manager for the preliminary phase of the project that is studying the widening of Highway 101 from Paso Robles Street to the existing SR 46 East Ramp. The project will likely involve the widening of the existing ramp bridge and possibly the Salinas River Bridge. Retaining walls and embankments are also planned for the project.

Judd is managing the preparation of a Preliminary Geotechnical Design Report for the project in accordance with Caltrans guidelines.

EXPERIENCE
21 years

EDUCATION
BS Civil Engineering, California
Polytechnic State University,
San Luis Obispo, CA

REGISTRATION
Professional Engineer -
CA #68257
Registered Geotechnical
Engineer - CA #2903

YEARS WITH YEH
8 years
Judd King, PE, GE
Geotechnical
US 101/Prado Road Interchange • City of San Luis Obispo • July 2024 • 151 Jamie has more than 9 years of experience performing field logging and exploration, geotechnical analyses for slopes and foundation systems, geotechnical design for retaining walls and landslide repairs, and preparing preliminary and design-level geotechnical reports. She is experienced in performing field exploration and geotechnical evaluations for pipelines, pump stations, reservoirs, water and wastewater treatment plants, and seismic hazard assessments. She has worked on several bridge and interchange improvement projects up and down the Highway 101 corridor and throughout San Luis Obispo County. Jamie’s field experience includes mud rotary, rock coring, hollow stem auger and other drilling methods as well as in-situ testing using the cone penetrometer.

Jamie has experience in geotechnical investigation, analyses, and report preparation for a variety of public infrastructure projects. Jamie is experienced with Caltrans design methods, standard plans and details, and with the AASHTO LRFD Bridge Design Specifications. She also teaches soil mechanics classes part time in the Civil Engineering Department at Cal Poly, San Luis Obispo.

Select Project Experience
US 101/AVILA BEACH DRIVE INTERCHANGE IMPROVEMENTS, San Luis Obispo County, CA; Staff Engineer. The project includes the design of a roundabout at the intersection of Shell Beach Road with Avila Beach Drive and rerouting southbound on and off-ramps from the highway. Design features include retaining walls, embankments, drainage improvements, stormwater infiltration, and pavement. Retaining walls will provide grade separation under the overcrossing and along the southbound on-ramp. Jamie performed the field exploration and the geotechnical analyses for the project. She prepared the Preliminary Geotechnical Design Report, Geotechnical Design Report, and a Foundation Report for the project in accordance with Caltrans guidelines. Construction of the project is slated to begin in 2024.

TRAFFIC WAY BRIDGE REPLACEMENT, Arroyo Grande, CA; Project Engineer. This project includes the replacement of Traffic Way Bridge, a multi-span bridge with a total length of approximately 210 feet that spans Arroyo Grande Creek. Scour and structure degradation has led to the need to replace the bridge that serves as a main arterial for the city. The new bridge will be a single span structure supported on CIDH pile abutments. Prefabricated girders are planned to support the new bridge structure. Jamie logged the borings that were drilled through the existing bridge deck and performed the geotechnical analyses for the project. She prepared the Foundation Report for the project in accordance with Caltrans guidelines.

HIGHWAY 101 NORTHBOUND/SR46 EAST RAMP IMPROVEMENTS, Paso Robles, CA; Project Engineer. The preliminary phase of this project involves planning for widening Highway 101 from Paso Robles Street to the existing SR 46 East Ramp. The project will likely involve the widening of the existing ramp bridge and possibly the Salinas River Bridge. Retaining walls and embankments are also planned for the project. Jamie is preparing the Preliminary Geotechnical Design Report for the project in accordance with Caltrans guidelines.

PRADO ROAD BRIDGE REPLACEMENT, San Luis Obispo, CA; Project Engineer. The existing twolane bridge over San Luis Obispo Creek at Prado Road will be replaced with a 104-foot-wide singlespan bridge. Preliminary work included subsurface exploration and development of pile design recommendations for the bridge. Jamie has performed all of the geotechnical analyses and report preparation for the project. The project is in design and planned to be in construction sometime in 2025.

EXPERIENCE
9 years

EDUCATION
MS, Civil Engineering -
Geotechnical Specialization,
California Polytechnic State
University, San Luis Obispo
BS, Civil Engineering, California
Polytechnic State University,
San Luis Obispo

REGISTRATION
Professional Engineer -
CA #91504

YEARS WITH YEH
9 years
Jamie Ross, PE
Geotechnical
US 101/Prado Road Interchange • City of San Luis Obispo • July 2024 • 152 Mike joined Yeh and Associates following a 26-year career with Caltrans, where he served as the Branch Chief of Geotechnical Design–North. His experience includes all aspects of conducting geotechnical investigations, including engineering analyses for bridge foundations, earth retaining structures, and preparing reports, estimates and technical specifications for geotechnical structures and materials. He has extensive experience and familiarity with Caltrans design methods, LRFD, and the AASHTO design guidelines. Mike serves as a senior project specialist assisting with technical review and support on various infrastructure projects for Yeh.

Select Project Experience
PRADO ROAD BRIDGE, San Luis Obispo, CA; Senior Project Specialist. Mike has served as technical specialist for the design of the Prado Road Bridge replacement at San Luis Obispo Creek. Preliminary work included subsurface exploration and development of pile design recommendations for the bridge. Other aspects of the project include tiered soldier pile tie-back walls to address scour potential and deep-seated abutments for the proposed structure. Mike is continuing work on the bridge replacement project with Yeh.

HIGHWAY 101 NORTHBOUND/SR46 EAST RAMP IMPROVEMENTS, Paso Robles, CA; Senior Project Specialist. The preliminary phase of the project includes a study for the widening of Highway 101 from Paso Robles Street to the existing SR 46 East Ramp. The project will likely involve the widening of the existing ramp bridge and possibly the Salinas River Bridge. Retaining walls and embankments are also planned for the project. Mike is providing technical assistance and oversight for the project including the preparation of a Preliminary Geotechnical Design Report for the project in accordance with Caltrans guidelines.

HIGHWAY 46 CORRIDOR IMPROVEMENT, San Luis Obispo County, CA; Supervisor-in-Charge.

The widening of State Route 46 from a 2-lane highway to a 4-lane expressway in eastern San Luis Obispo County has been under construction for the past 15 years. Mike was responsible for the geotechnical design of the 4.5-mile-long Whitley 1 segment which included the new 6-span Estrella River bridge supported on130-foot long, 96-inch diameter cast in drilled hole (CIDH) piles constructed under slurry. A pile load test was conducted using the Osterberg Method on a full scale pile. The 5.3 mile long Whitley 2A segment included retaining walls on spread footings and the new McMillan Canyon Creek Bridge.

US 101/AVILA BEACH DRIVE INTERCHANGE IMPROVEMENTS, San Luis Obispo County, CA; Senior Project Specialist. The project includes the design of a roundabout at the intersection of Shell Beach Road with Avila Beach Drive and rerouting southbound on and off-ramps from the highway.

Design features include retaining walls, embankments, drainage improvements, stormwater infiltration, and pavement. Retaining walls will provide grade separation under the overcrossing and along the southbound on-ramp. Mike performed QC/ QA review of a Preliminary Geotechnical Design Report, Geotechnical Design Report, and a Foundation Report for the project in accordance with Caltrans guidelines.

TRAFFIC WAY BRIDGE REPLACEMENT, Arroyo Grande, CA; Senior Project Specialist. Traffic Way Bridge is a multi-span bridge with a total length of approximately 210 feet that spans Arroyo Grande Creek. Scour and structure degradation has led to the need to replace the bridge that serves as a main arterial for the city. The new bridge will be a single span structure supported on CIDH pile abutments. Prefabricated girders are planned to support the new bridge structure. Mike has performed QC/QA checks of project documents including pile calculations and foundation report in accordance with Caltrans guidelines.

EXPERIENCE
34 years

EDUCATION
BS, Civil Engineering, California
State University,Chico

REGISTRATION
Professional Engineer -
CA #50138

CERTIFICATION/

TRAINING
National Highway Institute
Training:
• Geosynthetics Engineering
Workshop
• Geotechnical
Instrumentation
• Micropile Design and
Construction
• Mechanically Stabilized Earth
Walls and Soil Slopes
• Anchored Earth Retention
• Driven Pile Foundations
• Soils and Foundations
Workshop
• Stream Stability and Scour at
Highway Structures
• Drilled Shafts
• Rock Slopes

YEARS WITH YEH
8 years
Michael Finegan, PE
Geotechnical
www.consoreng.com
364 Pacific Street, 1st Floor
San Luis Obispo, CA 93401
916.368.9181

Page 440 of 504 ends

Detailed Scope
US 101/Prado Road Interchange • City of San Luis Obispo • October 2024 • 1 of 50 Scope of Services to be Provided by Phase
A detailed scope of services has been prepared for the City to review. The scope of work is based on our understanding of the scope of services provided in the Request for Proposals. Meetings are assumed to be virtual unless otherwise noted in the below scope. The City has laid out what appears to be concurrent reviews involving Caltrans and the City for each submittal. However, Caltrans per their quality management plan guidance will require that the City review submittals prior to delivery to Caltrans and for our team to document the review and response to comments. Our approach in the schedule shows a City review prior to submitting for Caltrans reviews, all submittals show concurrent Caltrans/City reviews after the initial submittal to the City.

PHASE I VALUE ANALYSIS, SURVEY, HYDRAULIC STUDY, GEOTECHNICAL INVESTIGATION, AND

UTILITY COORDINATION
Task 1 - Project Management and Meetings
TASK 1.1 - PROJECT MANAGEMENT
Consor North America, Inc. (Consor) will perform the activities necessary to plan, direct, and coordinate the work on this phase of the project. Consor will provide project management for each task for the entire duration of the agreed upon schedule. Consor assumes the duration of work for Phase I will not exceed 12 months.

Consor will submit monthly progress reports outlining all activities for which expenses are submitted. All activities will be itemized by task and will be consistent with the agreed upon Scope of Services. Progress reports will include the following:
> Status of work completed to date
> Expense allocation by task
> Work anticipated to be completed in the next reporting period > Identification of project issues, actions to resolve those issues, and the responsible party to drive resolution.

Project Correspondence and Project Files: All correspondence by and between Consor, the City, other agencies and parties will be recorded and filed for complete record keeping. Meeting notes, telephone record logs, incoming/outgoing correspondence, and all deliverables will be logged and filed. Outside correspondence will be coordinated with and approved by the City’s project manager. Project files will comply with the Caltrans uniform filing system as outlined in the Project Development Procedures Manual. This will facilitate transmitting the Project History File to the City during the future close out phase of the project.

Consor will provide weekly updates on progress to the City Project Manager. These updates will take the form of either e-mails or virtual meetings depending on the need for information.

Design Decision Log: Consor will disseminate up-to-date information to the project team at the PDT meetings. A Design Decision log will be prepared for items such as requests for information, documentation of decisions made as the project progresses in development, and deliverable status.

Caltrans Quantitative Risk Register: Throughout the project development process the Consor team will maintain a risk register that complies with Caltrans latest guidance.

TASK 1.2 - KICK OFF MEETING
A kick-off meeting will be held at the City offices and on site after the notice to proceed and will introduce the project team, establish communication channels, set the project schedule, clarify the scope of work, and define the roles and responsibilities of the various team members. Consor will coordinate the kick-off meeting with the consultant team and other project stakeholders that may be appropriate to thoroughly discuss the project background, scope, concepts,

Page 441 of 504 ends

Detailed Scope
US 101/Prado Road Interchange • City of San Luis Obispo • October 2024 • 2 of 50 schedule, and management. This meeting will result in an understanding amongst the project stakeholders as to the project scope and schedule, and major project issues that have already been identified by project stakeholders will be shared at this meeting.

TASK 1.3 - CLIENT FOCUS MEETINGS
Consultant assumes up to twelve (12) technical coordination meetings will be needed with the City and other outside agencies. These meetings will be identified as needed to obtain resolution of issues and consensus on strategies.

TASK 1.4 - PDT/COORDINATION MEETINGS (CALTRANS)
PDT meetings will be scheduled every month and held via telephone or video conference with the goal of keeping the project on track and to keep the City and Caltrans informed of the status of the project. One of these meetings would focus on the coordination and review of the Caltrans permanent changeable message sign project. Consor assumes that monthly conference call meetings will be one-hour in duration. This scope assumes a total of twelve (12) PDT meetings.

TASK 1.5 - PROJECT SCHEDULE UPDATES
Consor will update a project schedule on a monthly basis. The schedule will be developed using MS Project. The schedule will indicate critical path activities and major milestone deliverables.

TASK 1.6 - PUBLIC MEETING
The Consor team will attend one public meeting to present the results of the Value Analysis. The Project Manager, Deputy Project Manager, Bridge Project Engineer, Roadway Project Engineer, Landscape Architect, and Bridge Architect will attend and present the findings at the public meeting. We anticipate that the meeting will focus on the corridor aesthetics, hardscape, landscape, overall look and feel of the improvements. In addition, we will provide an update to the project timeline. We will be available to answer the public’s questions and listen to their concerns about the improvements.

It is assumed that the Consor team with the City will provide a short presentation to the public and then we will break into subgroups to address specific questions and gather feedback on the improvements.

The coordination, public outreach, and documenting public feedback for this public meeting is covered in Task 9.0 Public Outreach.

ASSUMPTIONS:
> All hard costs related to room, equipment, refreshments, and insurance are not included > Printing, postage, and production costs are not included > Meeting will be up to two hours long
> The technical team will provide content for the PowerPoint and exhibit boards, including photographs, illustrations, and renderings.

TASK 1.7 - QUALITY MANAGEMENT PLAN
As required by the COOP Agreement between the City and Caltrans, a Quality Management Plan (QMP) must be prepared for each component phase. Consor will develop, establish, and keep updated a project specific QMP that will include procedures and timetables for conducting independent quality reviews for all reports, plans, estimates, and design documents. A big part of our team’s QMP will be supplemented by Brian Ray of Sunrise Transportation Strategies. Brian will be providing his expertise to the roadway geometrics of the interchange. This will:
> Permit adherence to the QMP by both Consor and our subconsultant team throughout the course of this phase of work
> Initiate and document quality reviews and address corrective actions > Conduct quality audits to ensure quality control procedures are strictly followed and properly documented.

Page 442 of 504 ends

Detailed Scope
US 101/Prado Road Interchange • City of San Luis Obispo • October 2024 • 3 of 50 > Perform a thorough review and verification of corrections by an independent reviewer TASK 1.8 - ENCROACHMENT PERMITS — CALTRANS AND CITY
A Caltrans Encroachment Permit will be required to conduct topographic surveys, geotechnical borings, and soil sampling.

Our team will prepare the permit application, including attachments depicting traffic control, boring and sampling locations for the City’s signature. Consor will submit the application to Caltrans District 5 on behalf of the City. We expect two rounds of comments from Caltrans Encroachment staff before issuing the permit. Our scope assumes that a no cost permit from the City will be prepared and issued by the City.

TASK 1 DELIVERABLES
> Meeting attendance, agendas, and notes
> Design Decision Logs
> Updated Risk Register
> Monthly Progress Reports and invoices
> Project Schedule (including monthly updates) in Microsoft Project and PDF Format > Attendance and presentation materials for one (1) public meeting > Project correspondence
> Compliance assistance as needed
> Caltrans Encroachment Permit application and attachments Task 2.0 - Grant Assistance
AECOM will lead this effort for the Consor team with support from Consor. The focus during Phase I will be the development of a funding scan and strategy to identify and evaluate suitable federal, state, and regional discretionary grant programs which the Project could potentially access to offset capital costs associated with its construction.

TASK 2.1 - APPLICABLE GRANT OPPORTUNITY MEMO
From the funding scan, the team will prepare both a word document with information on each suitable funding program as well how to position the Project so as to align with sought after program outcomes, as well as an excel base matrix with all the pertinent information about the funding program. These will be living documents and spreadsheets which will be updated annually as program information and objectives change, new funding programs are introduced, and others sunsetted.

As part of this task, AECOM task lead will attend one virtual meeting with the City, Caltrans, and SLOCOG to discuss funding programs and strategies.

During Phase I, we will identify and evaluate strategies to increase the Project’s overall competitiveness for specific grant programs identified.

TASK 2.2 - GRANT APPLICATION ASSISTANCE
The AECOM team will develop one grant application and supporting materials during Phase I. Based on our experience, the grant application development will be comprised of:
> Application coordination
> Narrative development
> Economic justification/Benefit Cost Analysis
> QA/QC
> Graphic design

Page 443 of 504 ends

Detailed Scope
US 101/Prado Road Interchange • City of San Luis Obispo • October 2024 • 4 of 50 TASK 2 DELIVERABLES
> Grant Opportunity Memo (Word and Excel)
> Attendance at one virtual meeting
> One Grant Application (PDF)
Task 3.0 - Project Vision and Handoff
The City and the PA&ED design team have been working on this project for several years. It will be important that the Consor team has access to the design files and personnel from the previous phases of work. This is imperative to allow our team to hit the ground running and deliver the PS&E phase in a timely manner.

TASK 3.1 - PREVIOUS WORK INVENTORY
Consor will develop a tracking spreadsheet to serve as an inventory of the previous work completed. The tracking spreadsheet will include a description of the material received, the date received, the format of the material, and a brief description of the usefulness of the materials.

TASK 3.2 - HANDOFF MEETINGS
The Consor Project Manager, Deputy PM, and Project Engineers will attend three meetings with the City and PA&ED Design team. The purpose of these meetings will be to discuss and better understand the How and Why’s of the preliminary design and layout. Our team does include HDR, who performed the hydraulic analysis for the previous phase and Rincon, who completed the IS-MND for the project. We will prepare meeting agendas and meeting notes as part of this task.

TASK 3.3 - HANDOFF MEMORANDUM
Consor will prepare a memorandum of our understanding of the previous design work done to date. The memorandum will include recommendations for process improvements, a list of challenges and how our team will overcome them, a list of the previous work inventory, tracking spreadsheet, and an updated scope of work.

TASK 3 DELIVERABLES
> Previous work tracking spreadsheet (Excel)
> Attendance, agenda, and meeting notes for three (2 in person and 1 virtual) meetings > Project Handoff Memorandum and Updated Scope of Work (PDF) Task 4.0 - Surveying/Topographic Mapping
To support the planning, design, and engineering effort for the proposed Prado Road Interchange Project, current and accurate survey information will be required to provide the design team with existing conditions and right of way alignment.

This task includes providing a topographic, boundary, right of way, easement mapping, with specific additional mapping related to Flood Study Mapping, compiled in a survey base map to support of the design of the project. Figure 1 shows the approximate area to be surveyed.

TASK 4.1 - FIELD WORK/ TOPOGRAPHIC DATA COLLECTION
The survey mapping will be constrained horizontally to the California Coordinate System of 1983 (CCS83), Zone 5 projection and vertically to the North American Vertical Datum of 1988 (NAVD88) as established locally by constraining to the City of San Luis Obispo’s horizontal and vertical control networks. Our surveyors will set semi-permanent survey control points near the expected project limits for future use as control for construction staking by others.

The aerial mapping will cover approximately 80 acres of land, including a variable width strip of approximately 4,700 feet of US 101 and 1,800 feet of Prado Road, along with 1,600 feet of Elks Lane. The limits of the aerial mapping is outlined in blue in Figure 1. The aerial mapping will be compiled from data collection techniques, including high altitude aerial photogrammetry and aerial LiDAR to enhance the digital elevation model in areas of dense brush. Photography will be

Page 444 of 504 ends

Detailed Scope
US 101/Prado Road Interchange • City of San Luis Obispo • October 2024 • 5 of 50 captured at an elevation appropriate for a mapping scale of 1” = 20’, with a one foot contour interval digital terrain model surface.

The aerial mapping will serve as the base mapping layer and be supplemented by field survey densification and augmentation. Just as the ultimate aerial mapping limits have and will be closely coordinated together with the design team, the extent and focus of the field survey augmentation will also be.

Working closely with the Consor team the aerial mapping will be augmented with field survey. This is depicted by the green line in Figure 1. We also anticipate providing field densification of Figure 1 Limits of surveying and topographic mapping
the digital elevation model and in support of conform design at approximately six (6) locations, covering approximately 9.3 acres, including almost 4,000 feet of the easterly pavement of the north bound lanes of US 101. Shown in pink in Figure 1.

In support of the drainage analysis we have coordinated our efforts with the design and analysis team. Our scope of work includes providing up to 10 cross sections of the San Luis Obispo Creek upstream and downstream of the Prado Road Bridge. As part of our work for the City of San Luis Obispo’s Prado Road Bridge Widening Project, we collected detailed topographic information of San Luis Obispo Creek around the existing bridge. We will review this data and incorporate survey measurements and topographic survey that remains sufficiently accurate at the time of the survey mapping for this project, including mapping of the Prado Road bridge and the Bob Jones Bike Trail Bridge and creek cross sections. For budgeting purposes, we have assumed that the topography related to the fixed works, i.e.pavement, footings, railings, etc. will be able to be used, and that measurements of the ground surface will need to be updated. We do not anticipate surveying tree locations. We will also measure the finished floor elevations of buildings located within the drainage analysis area of interest.

Page 445 of 504 ends

Detailed Scope
US 101/Prado Road Interchange • City of San Luis Obispo • October 2024 • 6 of 50 For budgeting purposes, we have included three field survey days to complete this work and associated office time and have assumed that the outreach to building owners will be completed by the City of San Luis Obispo, or others. The limits of the area that building finished floors will be measured is shown in cyan.

These techniques and approaches will result in mapping showing such visible features as edges of pavements, curb, gutter, sidewalk, driveways, walls, fences, street signs, road striping, utility poles and structures, overhead utility lines, manholes, inlets, subsurface drainage system flow lines, culvert diameters, utility markings, fire hydrants, buildings, trees four inches in diameter and larger measured at breast height, brush and vegetation lines, and other items typical to standard practice.

Our scope includes two (2) days of traffic control for mapping and locating monuments within the vehicular traveled way and if needed for topographic measurements. We assume no additional traffic control will be needed.

To reduce the overall need for traffic control safety and to more safely collect survey measurements in and around vehicular traffic, we will use various remote sensing technologies. Wallace Group survey crews are equipped with Trimble’s SX10 scanning total station and Trimble X7 terrestrial scanner. Surveying with these devices results in information rich, high density, colorized point clouds of the areas of interest they are deployed within.

This results in conform pavement level survey measurements of areas of US 101 and other busy roads without placing survey crew field staff near, around or within high speed traffic. At the same time, resulting in the needed survey measurements that are typical to pavement surveys within the proposed project areas, while also collecting additional dense geometric information of the surrounding areas. As the project develops, and possible conform locations shift, it is possible that sufficient measurements have already been collected and stored in the point cloud model. Instead of having a change in design result in a new unexpected survey field crew site visit, using these tools results in an efficient extraction of critical measurements from the already collected dense point clouds. Further, these point cloud models can be utilized graphically in support of project rendering that clearly convey project intent to the lay public. Deploying these tools in this manner mitigates Caltrans’ Survey Manual instructions and concerns regarding weighing the value and need of pavement level accuracy measurement against the safety concerns of the public.

Topographic measurements and information collected as part of this task will be compiled into a single Civil 3d, 2024 or newer, drawing file and will be referenced into and be part of our survey base map and deliverable.

TASK 4.2 - RIGHT-OF-WAY, BOUNDARY, AND EASEMENT SURVEYS Our survey team anticipates locating sufficient monuments to establish portions record right of ways a several City of San Luis Obispo public streets, US 101 and the property sidelines of properties adjacent to these stretches within the proposed survey densification and augmentation project area. This includes re- establishment of the record location of the following right of way:

1. Prado Road: Approximately 1,600 feet of Prado Road easterly of the US 101 right of way.

2. Prado Road: That portion of the paper Prado Road right of way located easterly of US 101 being Lot 303 as shown on map of Tract 3096.

3. Dalidio Drive and Froom Ranch Way: That portion of Dalidio Drive and Froom Ranch Way located easterly of Lot 303 and within the project area.

4. US 101: Approximately 2,500 feet of US 101 right of way northerly of Prado Road and approximately 1,500 feet of US 101 right of way located southerly of Prado Road, for approximately 4,000 feet total.

We will also re-establish the approximate locations of the property sidelines that are adjacent to these right of ways.

Wallace Group has surveyed several of these properties in the past, or portion thereof, or properties that are very near or adjacent to the properties that are within the survey limits for this projects. More importantly, Wallace Group has a greater level of experience surveying several of the properties that the project may impact.

Page 446 of 504 ends

Detailed Scope
US 101/Prado Road Interchange • City of San Luis Obispo • October 2024 • 7 of 50 Our team has included scope and budget to assist and support the City in researching and if necessary, processing revisions to the several APN’s that were created as private open space and agricultural easements as a result of Tract 3096 which have encumbered the western side of US 101. This also includes the potential impact to the private “Billboard Easement”.

As part of the right of way effort, our team will also review preliminary title reports for the properties adjacent to the road right of ways within the project limits and near proposed project improvements in an effort to research, discover and plot easements that may impact the project. For budgeting purposes, we have included purchasing and reviewing up to 15 preliminary title reports with an average cost of $600, and plotting up to two easements per title report.

For budgeting purposes, we have assumed that no material discrepancies will be discovered as part of this task and that this task will not require a record of survey.

The information discovered and re-established as part of this task will be compiled in a single unique Civil 3d, 2024 or newer, drawing file and will be referenced into the survey base map and deliverable.

TASK 4.3 - ROAD ALIGNMENTS
Consor and Wallace Group will work closely to plot road construction alignments for US 101 mainlines, on and off ramps, and the City of San Luis Obispo Prado Road, Elks Lane and Dalidio Drive. For US 101, the Caltrans right of way maps will be used for the alignment control and for the City of San Luis Obispo roads, we will base the alignment off provided information, or the team will create best fit alignments.

The road alignment will be compiled in a single Civil 3d, 2024 or newer, drawing file, and be part of our survey base map and deliverables.

TASK 4 DELIVERABLES
> Civil 3d, 2024 or newer, drawing files:
• Topographic survey
• Right-of-way/property/easement survey
• Road alignments
> Signed and sealed 22 X 34 inch survey base map
Task 5.0 - Design Technical Reports
This task includes the preparation of geotechnical, bridge design hydraulics, stormwater data, drainage, environmental permitting and mitigation measures and right-of-way needs reports. The scope presented below is based on Consor’s Alternative 3A (approximately 1000 feet of bridge with retaining walls).

TASK 5.1 - GEOTECHNICAL DESIGN AND MATERIALS REPORT
Yeh will prepare a Preliminary Geotechnical Design Report (PGDR) for the design of the project. Deliverables will be prepared in accordance with the applicable Caltrans and AASHTO guidelines and manuals. Our scope includes two separate Geotechnical Reports, one for the project and one specifically for the structures included in the project. The geotechnical scope for Phases I and II is based on our knowledge of the required reports for structures, earth retaining structures and the overall project which are based on the Caltrans Geotechnical Manual. All reports will be submitted to the City of San Luis Obispo and Caltrans for review.

Assumptions for Geotechnical work:
> All work will be allowed and permitted to be performed during daylight hours between 0600 and 1800. > City will allow staging of equipment and materials at their corporation yard located at 25 Prado Road. Materials such as

Page 447 of 504 ends

Detailed Scope
US 101/Prado Road Interchange • City of San Luis Obispo • October 2024 • 8 of 50 drilling rod, cement, drilling fluid drums and other equipment will be allowed to be stored. An area of 20 feet wide by 40 feet long would be needed.

Draft Preliminary Geotechnical Design Report (PGDR)
Perform a preliminary geotechnical evaluation of the site using the existing information and prepare a Preliminary Geotechnical Report (PGDR) for the proposed project. The report will include:
> Project description
> Overview of existing geotechnical information including as- built data > Geotechnical conditions including:
• Site geology
• Topsoil – soil survey review
• Surface conditions
• Subsurface conditions based on previous studies
• Groundwater
• Seismic hazards including fault rupture, ground motion parameters developed from ARS-online, seismic parameters for slope stability analyses, liquefaction, and liquefaction induced lateral spreading > Geotechnical design evaluation including options for earth retaining structures, slopes, or sound walls (if needed) > Geotechnical design considerations pertaining to project aspects including right-of-way, constructability, and construction timeline
A draft report will be submitted for the City and Caltrans review and comment. Comments will be incorporated as appropriate. It is anticipated that project alternatives will not be added between the Draft and Final reports. Up to two rounds of reviews by the City and Caltrans are anticipated.

TASK 5.1 DELIVERABLES
> Draft Preliminary and Final Geotechnical Design Report (PGDR) TASK 5.2 - STRUCTURE PRELIMINARY GEOTECHNICAL DESIGN REPORTS (SPGR) Alternative 3A includes both earth retaining structures and bridge structures. Caltrans will require separate SPGRs be prepared for the earth retaining structures and the bridge structures.

Task 5.2.1 Draft Structure Preliminary Geotechnical Report (SPGR) for Earth Retaining Structures Yeh will compile and review published reports, maps, historical photos, and drawings pertinent to the proposed retaining walls. This review will specifically include reviewing Log of Test Borings prepared for the existing structures in the area of the project.

Yeh will perform a preliminary geotechnical evaluation of the site using the existing information and prepare a Structures Preliminary Geotechnical Report (SPGR) for the proposed earth retaining structures (ERS).

The report will include the following:
> Project description and proposed ERS structures;
> Overview of existing geotechnical information including as- built data; > Geotechnical conditions based on previous studies including site geology, surface conditions, subsurface conditions, groundwater; as well as corrosion and scour data;
> Seismic information including the ground motion parameters as well as the potential for the site and design of the project to be impacted geologic hazards such as seismic shaking, fault rupture, liquefaction or seismic settlement, lateral spreading, and slope instability;
> Preliminary recommendations for earth retaining structure types and associated foundation considerations as input

Page 448 of 504 ends

Detailed Scope
US 101/Prado Road Interchange • City of San Luis Obispo • October 2024 • 9 of 50 to type selection; and
> Recommended field work and laboratory testing for design phase services.

A draft report will be submitted for the City and Caltrans review and comment. Comments will be incorporated as appropriate. Up to two rounds of reviews by the City and Caltrans are anticipated. It is anticipated that project alternatives will not be added between the Draft and Final reports.

Task 5.2.2 Draft Structure Preliminary Geotechnical Report (SPGR) for US 101 OC/Ramps at Prado Road Yeh will compile and review published reports, maps, historical photos, and drawings pertinent to the proposed overcrossing structure and ramps. This review will specifically include reviewing Log of Test Borings prepared for the existing structures in the area of the project.

Yeh will perform a preliminary geotechnical evaluation of the site using the existing information and prepare a Structures Preliminary Geotechnical Report (SPGR) for the proposed overcrossing structure.

The report will include the following:
> Project description and proposed structures;
> Overview of existing geotechnical information including as- built data; > Geotechnical conditions based on previous studies including site geology, surface conditions, subsurface conditions, groundwater; as well as corrosion and scour data;
> Seismic information including the ground motion parameters as well as the potential for the site and design of the project to be impacted geologic hazards such as seismic shaking, fault rupture, liquefaction or seismic settlement, lateral spreading, and slope instability;
> Preliminary recommendations for foundation type selection for the structures; and > Recommended field work and laboratory testing for design phase services.

A draft report will be submitted for the City and Caltrans review and comment. Comments will be incorporated as appropriate. Up to two rounds of reviews by the City and Caltrans are anticipated. It is anticipated that project alternatives will not be added between the Draft and Final reports.

TASK 5.2 DELIVERABLES
> Draft and Final Preliminary Geotechnical Reports (SPGR)(ERS) and US 101 OC/Ramps TASK 5.3 - UPDATED LOCATION HYDRAULIC STUDY
HDR will be supporting the Consor team in the development of the hydraulics for the project. They are very familiar with the Location Hydraulic Study (LHS) from the PA&ED phase. Using the current version of the U.S. Army Corps of Engineers’ (USACE) Hydraulic Engineering Center River Analysis System (HEC-RAS) software, HDR will review, update, and implement proposed changes to the floodplain geometry identified in the value analysis recommendations, in the pseudo-steady-state 2D model previously developed for the Project. The results will be included in the updated Floodplain Evaluation Report, which will include the technical information for the Location Hydraulic Study and Floodplain Evaluation Report Summary forms, to document the investigation and determine the specific impacts on the floodplain and necessary avoidance, minimization, and/or mitigation measures.

Our scope assumes two rounds of comments from the City and Caltrans prior to finalizing the Floodplain Evaluation Report.

TASK 5.3 DELIVERABLES
> Draft and Final Updated Floodplain Evaluation Report (PDF) TASK 5.4 - DRAINAGE IMPACT STUDY REPORT
HDR will conduct a preliminary Drainage Impact Study to identify appropriate drainage design criteria and determine

Page 449 of 504 ends

Detailed Scope
US 101/Prado Road Interchange • City of San Luis Obispo • October 2024 • 10 of 50 existing hydrology and drainage systems within the Project area. The impact of the Project improvements will be documented, and recommendations for conceptual drainage improvements will be included in a technical report. A planning-level cost estimate for drainage improvements will also be included in the report.

Our scope assumes two rounds of comments from the City Caltrans prior to finalizing the Drainage Impact Study Report.

TASK 5.4 DELIVERABLES
> Draft and Final Drainage Impact Study Report (PDF)
TASK 5.5 - PRELIMINARY FLOODPLAIN AND BRIDGE DESIGN HYDRAULIC STUDY Using the hydraulic modeling developed for the Project’s Location Hydraulic Study, HDR will perform a hydraulic analysis to determine the design flow characteristics for the Project site, including limits and water surface profiles through the study area for the base flood and design flood. It is our understanding that as part of the Prado Creek Bridge project, San Luis Obispo Creek will likely be regraded. Our analysis will include the regrading of the creek based on the City provided grading surface. A bridge scour analysis will be completed to determine the scour potential according to the methodology specified in the Federal Highway Administration’s (FHWA) HEC-18 and HEC-20 manuals. The team will work to determine what, if any, scour countermeasures as necessary for the proposed improvements per the FHWA HEC-23 and Caltrans’ Highway Design Manual (HDM). HDR will model up to three (3) alternatives.

TASK 5.5 DELIVERABLES:
> Preliminary Floodplain and Bridge Design Hydraulic Study Report (PDF) TASK 5.6 - PRELIMINARY STORMWATER DATA REPORT
A Preliminary Stormwater Data Report will be prepared summarizing the Project impacts on water quality, general Project features, and recommended best management practices (BMPs). We will utilize Caltrans’ standard checklists. Our team will propose conceptual Project features or BMPs that meet the criteria set by the Regional Water Quality Control Board (RWQCB) and Caltrans National Pollutant Discharge Elimination System (NPDES) Permit. Additionally, the need for erosioncontrol measures will be addressed.

HDR will prepare a Stormwater Control Plan in accordance with the City’s stormwater requirements, and will use the Stormwater Control Plan template available from the City’s website. The Stormwater Control Plan will be included as an attachment to the Preliminary Stormwater Data Report.

TASK 5.6 DELIVERABLES:
> Preliminary Stormwater Data Report (PDF)
TASK 5.7 - WATER QUALITY ASSESSMENT REPORT
To provide the existing physical and regulatory environment information for water quality, HDR will 1) identify and describe the current and upcoming laws that relate to water quality; 2) describe the beneficial uses as detailed by the RWQCB Basin Plan for potentially affected waters; 3) discuss water quality objectives for potentially affected waters; 4) list potential sources of pollutants, existing water quality of the receiving water bodies, i.e., Total Maximum Daily Loads (TMDLs) or 303(d) impaired water bodies listed; and 5) describe the watershed, existing drainage, and hydrologic conditions. We will evaluate the water quality impacts for each proposed alternative and recommend possible BMPs or Project features to address water quality issues. HDR will document our findings in a technical report.

Our scope assumes two rounds of comments from the City and Caltrans prior to finalizing the Water Quality Assessment Report.

Page 450 of 504 ends

Detailed Scope
US 101/Prado Road Interchange • City of San Luis Obispo • October 2024 • 11 of 50 TASK 5.7 DELIVERABLES:
> Draft and Final Water Quality Assessment Report (PDF) TASK 5.8 - RIGHT OF WAY NEEDS DETERMINATION
Based on the approved 50% plans for the preferred alternative, Consor will finalize the right-of-way needs determination.

This document will include APNs, Ownership of Parcel, and Areas of temporary and permanent right-of- way needs for the project. This information will be presented in a graphic format with the information clearly summarized in a table (excel format).

TASK 5.8 DELIVERABLES:
> Exhibit Strip Map showing areas to be acquired
> Excel spreadsheet listing APN, Owner, and area required TASK 5.9 - RIGHT OF WAY ESTIMATING
Hamner, Jewell & Associates (HJA) will be supporting the Consor team for right-of-way support. HJA prepared Right-of-Way Data sheets as part of the PA&ED phase for the project. During this phase HJA will update the Right-of-Way Data sheets with current property values and updated right-of-way take areas, including updated utility relocation costs for the preferred alternative.

TASK 5.9 DELIVERABLES:
> Updated Right-of-Way data sheets for preferred alternative (PDF) TASK 5.10 - ENVIRONMENTAL PERMIT AND MONITORING MEMORANDUM The Consor team includes Rincon as our lead for environmental permitting and monitoring. An Environmental Permitting Memorandum will be prepared that will identify the regulatory permits required for the project as well as list applicable measures to avoid and/or minimize environmental impacts, including how implementation of measures, best management practices (BMPs), and compensatory mitigation will be monitored before, during, and/or after construction.

We assume that
a Lake or Streambed Alteration Agreement (LSAA) from the California Department of Fish and Wildlife (CDFW) and a Waste Discharge Requirements (WDRs) Permit from the Regional Water Quality Control Board (RWQCB) will be required, based on our understanding of the project and its associated environmental documentation.

The administrative draft Environmental Permitting Memo will be submitted to the City for preliminary review and revised in response to up to two rounds of consolidated comments.

TASK 5.10 DELIVERABLES:
> Administrative Draft, Draft, and Final Environmental Permitting Memorandum (PDF) Task 6.0 - Value Analysis
At the end of the PA&ED phase, the City conducted a hybrid Value Analysis that looked at six improvements to be considered in the next phase of work (five were determined to be viable). The focus of the previous work was to reduce the overall cost of the improvements. During this task, the Consor team will review the five viable improvements. Our team recommends we revalidate the design criteria and concepts considered in the previous phase. In addition, to the five improvements, our team suggests addressing the following elements that were not considered in the previous phase:
> Revalidate traffic analysis (Optional Task)
> Reducing the width of the overcrossing structure
> Fine tuning the limits and impacts to the floodplain by shortening the elevated portion of the project and the use of retaining walls with culvert openings

Page 451 of 504 ends

Detailed Scope
US 101/Prado Road Interchange • City of San Luis Obispo • October 2024 • 12 of 50 > Location of stormwater treatment facilities, including maintenance > Roadway drainage – City drainage versus Caltrans drainage > Relocation of wet utilities – water and recycled water lines > Use of sustainable materials, such as “Green” concrete > Determination of appropriate sustainable rating program to utilize > Review best practices for area underneath the elevated structures TASK 6.1 - DRAFT VALUE ANALYSIS REPORT
The Consor team will prepare a draft report that addresses the five design items previously discussed and the items listed above that the team, the City and Caltrans agrees should be addressed. The aesthetics for the Prado Road corridor will be developed in Task 7.0. These elements will be summarized in the Draft Value Analysis Report. The Draft report will document the process and decisions made during our Design Charrette meetings. Cost estimates will be summarized in the report. The Draft report will be prepared after the preferred alternative is chosen.

Task 6.1.1 - Design Charrettes (City and Caltrans)
The Consor Project Manager, Deputy Project Manager, Bridge and Roadway Project Engineers, Landscape Architect and Brian Ray will lead three (3) design charrettes with the City and Caltrans. The focus of the first design charrette will be to discuss and prioritize the potential improvements to be reviewed as part of the Value Analysis or revalidation process. The next two meetings will concentrate on the specific project improvements and the design team’s solutions to the concerns raised during the first meeting. In addition to the design charrette meetings, our Wet Utilities team will meet twice (2) with City utility staff to discuss the needs of the Wet Utilities within the project limits.

Task 6.1.2 - Conceptual Roll Map/Bridge Advance Plans
The Consor team will prepare a Conceptual Roll Map and Bridge Advance Plans of Alternative 3A to our first design charrette meeting as a starting point for the Validation Analysis. We will prepare two (2) conceptual plans and Bridge APS for the second meeting with the goal of gathering comments from the City and Caltrans. The goal for the third meeting would be to prepare two (2) conceptual plans and bridge APS and drill down in on the preferred concept.

Task 6.1.3 - Renderings of Preferred Alternative
After the third design charrette the design team will have a preferred alternative that incorporates those elements and revisions that the design team, City and Caltrans agree should be the basis for the preparation of the 50% Plans. The design team will create a 3-D model that will be rendered and colored. The rendering will be provided to the City and Caltrans for comment. We can provide the rendering as a roll map and/or as an electronic file format.

Task 6.1.4 - Cost Estimates
Understanding the costs associated with the options being explored during this task will be vital to making informed decisions. The team will prepare planning level (11 page estimate) cost estimates for each alternative. The estimate will be broken down to provide the City and Caltrans the cost for each element. We will prepare a total of six (6) estimates – one for Alternative 3A, two for each of the conceptual plans presented at the design charrettes and a final cost estimate for the preferred alternative.

TASK 6.1 DELIVERABLES:
> Draft Value Analysis Report (PDF)
> Attendance, agenda, and meeting notes for three (3) design charrettes (in person) > Conceptual Roll Plans (4 Alternatives) (PDF)
> Bridge Advance Planning Studies (4 Alternatives) (PDF) > 3 dimensional model of preferred alternative (PDF or Electronic) > Planning level cost estimates (total 6) (PDF)

Page 452 of 504 ends

Detailed Scope
US 101/Prado Road Interchange • City of San Luis Obispo • October 2024 • 13 of 50 TASK 6.2 - FINAL VALUE ANALYSIS REPORT
We will address two rounds of consolidated comments from the City and Caltrans on the Draft Report and incorporate, as appropriate, into the Final Value Analysis Report. A comment form will be prepared and submitted. The comment form will document the comment, response, and any further explanation as necessary.

TASK 6.2 DELIVERABLES:
> Draft Final and Final Value Analysis Report (PDF)
TASK 6.3 - VALIDATION OF TRAFFIC ANALYSIS (OPTIONAL)
This task is optional. The Consor team would encourage the City to consider a revalidation of the traffic analysis that was completed as part of the PID and PA&ED phases. We are not proposing to reanalyze all the intersections the original traffic study included. With the age of the traffic counts and the fact that they were done pre-pandemic, our team is suggesting updated traffic counts, an updated forecast model, and a future project compatibility. It is critical that the entire team is assured that the preferred alternative geometrics are still valid. This work will be led by DKS with support from Consor.

Task 6.3.1 - Update Traffic Counts and TOAR Volume Set Comparison This task is meant to determine the effects travel demand changes related to the COVID-19 pandemic and subsequent increase in work from home activity as well as traffic generated from recent development in the vicinity of the project (San Luis Ranch development) since the 2019 TOAR counts were collected. As part of this task, DKS will review up to 15 intersections including locations along Prado Road, South Higuera Street, Madonna Road, Los Osos Valley Road, and Froom Ranch Way as appropriate based on recent developments and targeted local intersections of concern for the City.

To the greatest extent possible, DKS will use counts from the City of San Luis Obispo’s count program, but our scope and fee includes the need for new counts at all study locations. Our team will also utilize available Caltrans PeMS stations to compare volume changes on US 101 between 2019 and 2024. This analysis is focused on operations and thus daily counts have not been included in this scope.

This analysis will be focused on direct volume comparisons during the AM and PM peak hours to help determine if there are any opportunities in the Value Analysis Investigation in Phase I. A ground truth of current traffic numbers will help inform the team’s decision-making process and may be potentially useful in supporting grant applications.

Our team will meet virtually with the City and Caltrans to discuss count locations and another time to discuss and review our findings.

Task 6.3.2 - Revalidation Assessment
Depending on the results of the Updated Traffic Counts and TOAR Volume Set Comparison, there may be a need to reanalyze the traffic operations previously reviewed in the TOAR. This can include intersection operations and freeway merge- diverge analysis. This analysis is not intended to reopen the environmental analysis and it is strictly meant to determine if the new base year traffic volumes would result in different needs for the interchange. This analysis will make adjustments to the 2050 design year volume set developed for the TOAR amendment based on the newly collected counts.

No new forecasting will be conducted as part of this task.

Our team will reanalyze existing conditions and design year traffic operations to determine if there have been any significant changes to the facility sizing needs based on five years of traffic growth since the previous analysis was initiated.

This analysis may also include some limited analysis of additional intersections which were not included in the 2023 TOAR Addendum (e.g. intersections along Froom Ranch Road which did not previously exist) based on City input and the locations collected in the previous task. This task assumes that all Synchro, HCS, Sidra, and Travel Demand model output files produced by GHD for the TOAR will be made available for use for this analysis.

Our scope includes three virtual meetings; one to discuss the revalidation needs, one to coordinate with GHD on file transfer

Page 453 of 504 ends

Detailed Scope
US 101/Prado Road Interchange • City of San Luis Obispo • October 2024 • 14 of 50 needs, and one to review our findings.

Task 6.3.3 - Future Compatibility Assessment
This task will take the work of the previous two tasks one step further and evaluate the traffic compatibility of the proposed interchange design with the previously considered options for providing ramps to and/or from US 101 southbound. Prior planning documents identified a need for access to the southbound freeway at Prado Road to relieve traffic stress off Madonna Road and Los Osos Valley Road. This task will re-analyze the interchange with up to two southbound ramp configurations to determine if the currently proposed design is compatible with potential future needs. This analysis will be focused on ultimate roadway sizing needs, intersection spacing, traffic operations, and queueing which may result from the addition southbound US 101 access.

This work will inform the Value Analysis Investigation to ensure that the interchange as proposed does not preclude the ability to address potential future traffic needs. The southbound ramp options were not analyzed in the TOAR and this analysis is meant to determine if the additional southbound freeway access may be warranted before the project design year. This analysis assumes using the analysis files obtained as part of previous task as a starting point for analysis. New forecasts will be developed as part of this task to include the southbound ramp access as well as any additional land uses near the interchange which may not have been previously considered. This task is not meant to be used for final concept development or environmental clearance for the southbound freeway access. This analysis is specifically meant to determine if there are any modifications to the currently proposed design which would allow for this future option and how likely it is that this option will be needed by the design year. If the southbound ramps are found to not be needed, this report could also help inform which aspects of the design could be modified to save on cost for not needing to account for this additional infrastructure.

Our scope includes four virtual meetings; one to discuss alternatives for evaluation, one to discuss preliminary results, and two to discuss comments and review final results.

TASK 6.3 (OPTIONAL) DELIVERABLES:
> Updated 2024 traffic count sheets
> Draft and Final Memorandum of Findings – comparing previous 2019 counts with the 2024 counts > Draft and Final Memorandum summarizing the revised existing conditions and design year analysis > Draft and Final Report summarizing the findings of the FCA TASK 6.4 - LEED/ENVISION/GREENROADS MEMORANDUM OF FEASIBILITY During the Public Meeting for Phase I, our team will discuss ways to incorporate sustainable elements into the project and reduce greenhouse gas emissions during construction. This collaborative effort with the City, Caltrans, and the public will help define and establish sustainability goals, priorities, preferred alternatives, and develop feasible designs for the project.

A pre-assessment checklist will be used to quickly compare project alternatives before key project decisions have been finalized. Establishing goals and priorities will help determine which sustainability rating system(s) would be appropriate to select for this project, and that will be further developed in Phase II.

After the public meeting, and the development of the pre-assessment checklist, our team will prepare a Memorandum to discuss the feasibility of incorporating these elements, recommend the most applicable sustainability rating system, likelihood of obtaining certification from the program and our team’s recommendation for Phase II.

TASK 6.4 DELIVERABLES:
> Administrative Draft and Draft LEED/Envision Memorandum (PDF) TASK 6.5 - SUSTAINABILITY MEMORANDUM
The Consor team will prepare a Sustainability Memorandum that describes material types, construction techniques, traffic control, and other methods to reduce greenhouse gas (GHG) emissions and limit environmental impact during

Page 454 of 504 ends

Detailed Scope
US 101/Prado Road Interchange • City of San Luis Obispo • October 2024 • 15 of 50 construction. The Sustainability Memo will incorporate required mitigation measures identified in the January 2023 Initial Study – Mitigated Negative Declaration (IS-MND) for the US 101/Prado Road Interchange Project, the project’s adopted Mitigation Monitoring and Reporting Program and Environmental Commitments Record, BMPs from Caltrans’ GHG Reduction Measures Toolbox (June 2021), and any applicable conditions of approval from the City of San Luis Obispo and Caltrans.

The Sustainability Memo will list applicable methods to limit environmental impacts, including how implementation of mitigation, conditions, and BMPs will be monitored during construction. The administrative draft Sustainability Memo will be submitted to the City for preliminary review and revised in response to one round of comments as part of Phase I.

Subsequent revisions will be addressed in Phase II.

TASK 6.5 DELIVERABLES:
> Administrative Draft and Draft Sustainability Memorandum (PDF) Task 7.0 - Schematic Aesthetic Development Apexx will lead the development of the aesthetic features for the Prado Road corridor. Consor and Wallace Group’s landscaping team will be assisting Apexx in this effort.

TASK 7.1 - DEVELOP RENDERINGS (3 CONCEPTS): BRIDGE, ROADWAY, SIGNAGE, LANDSCAPE Prior to developing the conceptual renderings, our team will meet with the City and Caltrans (including Caltrans Landscape Architectural Functional Unit) to brainstorm ideas for possible themes and aesthetic treatments for the bridge and retaining structures and railings, roadway enhancements including bicycle, pedestrian, and median hardscape/landscape treatments, plant palettes and locations, and lighting. This meeting will help set the vision for the corridor. After meeting with the City and Caltrans, the team will create three (3) concept alternatives based on the City and Caltrans direction with input from the design team. One of the concepts will be Alternative 3A as discussed in the Project Understanding and Approach. The development of the renderings will include:
> Creating a digital 3D model of surrounding site for rendering purposes. > Creating conceptual designs of railings, abutment, piers, lighting, superstructure type, texture, and color. > Producing renderings showcasing each alternative for team discussion during progress meetings. Renderings will be provided in JPEG, PNG, or PDF format at a resolution equal to 24”x36” at 300 DPI. All renderings and 3D modeling will be developed in Revit.

These renderings will be presented to the public for review and comment during the Public Meeting identified in Tasks 1.6 and 9.0. The team will utilize diagrams, renderings, animations, and drawings to illustrate the concepts to the public and solicit comments and feedback for a preferred option or direction.

TASK 7.2 - MEETING - CITY AND CALTRANS
The team will meet with representatives from the City and Caltrans after the draft renderings have been developed to gather input and consensus. We assumed two virtual meetings will be required to achieve consensus.

TASK 7.3 - DRAFT AESTHETIC REPORT
The aesthetic theme for the corridor will be documented in an Aesthetic Report. The report will document the process the team followed, and the decisions made and agreed upon by the team, the City and Caltrans. Feedback received from the public will also be documented in the report. The draft renderings will be included, as well as an estimate of the construction costs associated with the aesthetic treatments.

TASK 7 DELIVERABLES:
> Attendance, Agenda, and Meeting Notes at Pre-rendering virtual meeting with City and Caltrans > Draft 3D renderings for three (3) concepts

Page 455 of 504 ends

Detailed Scope
US 101/Prado Road Interchange • City of San Luis Obispo • October 2024 • 16 of 50 > Attendance, Agenda, and Meeting Notes for two virtual (2) meetings with City and Caltrans > Draft Aesthetics Report (PDF)
Task 8.0 – Utility Coordination - Phase I
Consor will provide utility coordination by working with the utility agencies identified in the survey mapping completed as part of Task 4 of the project. Consor will coordinate potential utility relocations (underground, wet and dry utilities) needed to construct the project.

Consor will follow Caltrans Local Assistance Procedures Manual (LAPM) Chapter 14 guidelines for the utility coordination for the project. During this task, we will focus on positively locating the utilities and begin coordinating with the City staff for the wet utilities and the dry utilities for undergrounding. The utility coordination will continue in Phase II of the project.

TASK 8.1 - “A” LETTERS
Consor will prepare Utility Verification Letters (“A” Letters) for each of the identified utilities. The “A” Letters will notify the utility company of the project and project limits, schedule and expectations. A color-coded plan showing existing and proposed right-of-way lines and existing and proposed utility facilities with the project improvements shown will be attached to the “A” letters. We will also include a conflict map identifying impacted utilities. The “A” Letter will request asbuilt or Atlas maps for the impacted utilities and determination of prior rights. “A” Letters can be provided to the City in MS Word format for placement on City Letterhead and signed by the City Project Manager and mailed, or Consor can place the letters on our letterhead and sign them. If the City chooses to sign the letters the contact information in the letter will be Consor’s Utility Task Lead.

TASK 8.2 - MEETINGS WITH AFFECTED UTILITIES (2 MEETINGS PER UTILITY, INCL CITY WET UTILITIES. 1 IN PERSON, 1 VIRTUAL)
Following the preparation and the utilities receipt of the “A” letters, Consor’s Utility Task Lead will attend an in person informational meeting out on site with all of the affected utilities. This meeting will be an opportunity to walk through the project impacts, timeline, goals, and verify utility alignments. The Utility Task Lead will schedule individual meetings with each affected utility to answer specific questions and discuss relocation options.

Consor’s wet utility task lead will meet in person once and once virtually with City staff to discuss the wet utility relocations specifically.

TASK 8.3 - POTHOLE EXHIBITS (2)
Consor will prepare exhibits depicting locations of potholing to be conducted by the City’s contractor. The pothole exhibits will be prepared once as-built and atlas plans have been received from those utilities that are underground. The maps will be the same color coded maps used for the “A” Letters and will show locations of the requested pot holing. We will submit a draft of the exhibits to the City for review and comment. We will address the City’s comments and submit a final exhibit.

Our scope assumes that the City will be coordinating potholing, traffic control, and all permits necessary for the potholing activities. We recommend that the locations and depths of the utilities determined during the potholing be surveyed. Our team can provide that service if desired.

TASK 8.4 - UTILITY COORDINATION - DRY UTILITIES TO UNDERGROUND The City desires to underground the overhead utilities along Prado Road, Elks Lane, and along the west side of US 101 in the area of the new overcrossing. Our scope assumes that the distribution electric line to the north of the project crossing US 101 will not be underground. Consor’s Utility Task Lead will be coordinating with the affected utilities to discuss options for the undergrounding. Those utilities crossing US 101 (overhead along the southside of Prado Road) can be placed in conduits in either the barrier rail or deck of the new overcrossing structure. The overhead lines along the north side of Prado Road that terminate at the northbound ramp termini can be placed in a joint trench in the new

Page 456 of 504 ends

Detailed Scope
US 101/Prado Road Interchange • City of San Luis Obispo • October 2024 • 17 of 50 roadway. The lines running overhead along the existing Elks Lane can also be placed in a joint trench. These alternatives will be discussed and coordinated with the affected utilities.

Our task lead will meet with the affected utilities two (2) times (virtually) during this task to determine right-of-way needs.

TASK 8 DELIVERABLES:
> Preparation of “A” Letters
> Attendance, Agendas, Meeting Notes and Action Items for Two (2), one in person and one virtual, with affected utilities.

Including City Wet Utilities
> Pot Hole Exhibits (Draft and Final) (PDF)
> Attendance, Agendas, Meeting Notes and Action Items for Two (2), two virtual meetings with Underground Utilities Task 9.0 – Bridge Type Selection
TASK 9.1 – PRE-TYPE SELECTION SUBMITTAL TO OSFP
Four weeks prior to submitting the draft Type Selection Report, Consor will prepare a Bridge Site Data Submittal Package (BSDS) and submit along with the Foundation Boring Plan and Draft Bridge Design Hydraulics Report to Caltrans according to the Office of Special Funded Project (OSFP) Guide.

TASK 9.2 – TYPE SELECTION REPORT
Consor will prepare a Type Selection Report for the bridge and retaining wall structures associated with the new Prado Road Interchange. It is assumed one comprehensive report will be developed to include all the structures.

The Type Selection Report will contain a General Plan, a General Plan Estimate, a draft Foundation Plan for each alternative for the structure, along with a memorandum addressing geotechnical, aesthetic, environmental and cost issues as outlined in the OSFP Memo 4-2 and Caltrans Memos to Designers 1-29. A structures type recommendation will be included in the report. It is assumed no more than two alternatives will be investigated. The bridge structure types assumed to be evaluated include cast-in-place post-tensioned concrete box girder and precast prestressed concrete wide flange girder.

Retaining wall structure types assumed to be evaluated include Caltrans Standard Type 1 and Mechanically Stabilized Embankment.

For each bridge alternative evaluated, consideration shall be given to structure depths, clearance over US 101, falsework requirements, slope stability (abutments), and constructability. The structure foundations shall be discussed with the geotechnical engineer to determine foundation type. The evaluation shall identify traffic handling and falsework assumptions (as required). Any required construction staging and the dimension of any required falsework openings will be shown on the General Plan. The choice of structure type shall be based on criteria outlined in Caltrans Bridge Design Aids and Memo to Designers. Estimates will be prepared for all alternatives and will be included in the Report. The following shall be indicated on the General Plan:
> Structure length, width, depth, and type
> Railing, including temporary K-rail
> Stage construction information, as required
> Type of foundation assumed
> Falsework assumptions if required
> Aesthetic requirements which affect cost of structure > Roadway widths
> Estimated construction costs
TASK 9.3 – DRAFT TYPE SELECTION REPORT SUBMITTAL TO CITY Consor will submit the Draft Type Selection Report including attachments to the City for review and comment.

Page 457 of 504 ends

Detailed Scope
US 101/Prado Road Interchange • City of San Luis Obispo • October 2024 • 18 of 50 TASK 9.4 –TYPE SELECTION REPORT SUBMITTAL TO CALTRANS & TYPE SELECTION MEETING Upon receiving approval from the City on the Type Selection Report, Consor will submit the report to Caltrans in order to schedule a Type Selection Meeting as per the guidelines outlined in the OSFP Guidelines. Consor will present the structure at a Type selection Meeting. The Project Manager, Deputy Project Manager, Bridge Project Engineer will attend the Type Selection meeting in person. The Project Geotechnical and Hydraulics Engineers will attend virtually.

After receiving all comments from the meeting, Consor will revise the General Plans and General Plan Estimates for Structure and walls as well as the Type Selection Report.

TASK 9 DELIVERABLES:
> Pre-Type Selection Submittal to OSFP including BSDS, draft Foundation Boring Plan, & draft Hydraulics Report > Draft Type Selection Report to City
> Final Draft Type Selection Report to City
> Draft Type Selection Report to Caltrans
> Schedule, prepare, attend Type Selection Meeting with Caltrans > Finalize Type Selection Meeting Notes
> Finalize Type Selection Report and submit to City and Caltrans Task 10.0 - Public Outreach - Phase I
Verdin Marketing will be leading the Consor team’s Public Outreach efforts for the Prado Road Interchange project. The team will work with the City to tailor a Communications Plan to achieve the City’s goals for communicating with the Public.

As part of this task, the team will hold an immersion session with the City, SLOCOG, and Caltrans to discuss the needs and deliverables, determine metrics, and gather input to inform the Communications Plan .

A project-specific Communications Plan for Phase I and II will be prepared as part of this task. The Communication Plan will be submitted to the City for their review and approval before finalizing.

Verdin will update the City’s existing Prado Interchange illustration, Fact Sheet and FAQs based on the Consor design team’s proposed modifications, with City and Caltrans concurrence.

Talking points for key staff to respond to questions from the media and the public will be developed as part of this task.

TASK 10.1 - PUBLIC MEETING - VA RECOMMENDATIONS
This task includes Verdin’s support of the design team’s Public Meeting. Attendance and preparation for the public meeting for the technical design team is included in Task 1.0 for Phase I. As part of this task, Verdin will complete the following:

Announcement, coordination and facilitation of one public meeting to present the recommendations of the Value Analysis task to the public. This effort includes:
> One press release and media outreach to get coverage before and after public meeting > Utilizing the City’s email program, send a branded email to residents and businesses > Creation of signage, comment cards, updates to fact sheet/ FAQs. Printing not included. > Presentation and display coordination for the meeting > Coordination and facilitation of public meeting to present the findings of the Value Analysis. Our team recommends that the public meeting be held at the City Corp Yard on Prado Rd.

TASK 10.2 - MEETING MINUTES AND COMMENT MATRIX
After the Public Meeting, Verdin and the design team will follow up with a meeting report with a summary of public engagement and comments/questions, the creation of a database for future outreach, and suggestions for project

Page 458 of 504 ends

Detailed Scope
US 101/Prado Road Interchange • City of San Luis Obispo • October 2024 • 19 of 50 refinements based on public input.

As an option, the team can videotape the public meeting for posting on the City’s Prado Interchange website to ensure information and ability to comment is inclusive of all audiences.

TASK 10.3 - LOCAL RESIDENCE OUTREACH - MASS MAILERS (2) Our team envisions that one mailer to all residents and businesses within the immediate area (anticipated to be a .5 mi radius from US 101/Prado interchange site, to include San Luis Ranch neighborhood and Madonna Plaza on west side of US 101, and businesses/residents at So. Higuera and Prado on east side of US 101) announcing the upcoming Public Meeting.

Our scope assumes the City will print and mail the mailer.

A second mass mailer could either be specific to businesses in the area with a business focused Fact Sheet. Alternatively, the second mass mailer could be a recap and a link to view meeting (if the City authorizes the videotaping of the meeting).

The mailer would be sent to the same audience that received the public meeting announcement. Our scope assumes the City would print and mail the mailer.

TASK 10.4 - PRESS RELEASES (3)
One press release would be prepared to get coverage for the Public Meeting to discuss the Value Analysis findings. A second press release would be prepared as a recap of the public meeting, and a third would be prepared to announce a planned event or as story generation, as appropriate.

TASK 10.5 - MEDIA MANAGEMENT
Our team recommends providing an outreach to the media at the start of the project to inform them of the project timeline, scope and plans to ensure channels of communication remain open.

It is recommended that the media be updated regularly; Verdin is also available to develop additional press releases and media relations for unplanned eventualities where media and public information is needed. Depending on the amount and level of effort additional scope may be required.

TASK 10.6 - CITY OF SLO WEBPAGE MONTHLY UPDATES
The team will provide monthly updates to the City’s Prado Road Interchange Project webpage. The existing webpage is housed on the City’s website with general information on the project. We will start by updating the current illustration, Fact Sheet, and FAQ’s, and noting the updated project timeline and public meeting dates and information. It is assumed that 12 updates will be completed during Phase I.

TASK 10.7 - PROJECT BOARDS FOR OUTREACH MEETINGS (3 EVENTS, 4 BOARDS EACH) The Consor team will provide project boards showing renderings of the proposed project improvements, including aesthetic treatments, landscaping (planting palettes), and hardscape options. The boards can also include project timelines, extents of flooding, location of stormwater quality/treatment areas, and utility relocations. It is anticipated that the aesthetic content for these boards or other media will be similar to those created as part of Task 7.0.

These boards/graphics/renderings will be prepared to support the public meeting and two other events like Farmer’s Market or placement at City offices.

Our scope includes the development, printing and mounting of four boards for three separate events. It also assumes that at least two of the boards will be reused at the three events for a total of eight boards.

TASK 10 DELIVERABLES:
> Final Phase I Communications Plan
> Draft Phase II Communications Plan

Page 459 of 504 ends

Detailed Scope
US 101/Prado Road Interchange • City of San Luis Obispo • October 2024 • 20 of 50 > Updated Prado Interchange Illustration, Fact Sheet, FAQs > Talking points for Key Staff
> Attendance at Public Meeting (Verdin only)
> Public Meeting Report (PDF), including comment matrix > Two mass mailers (PDF)- City to print and mail
> Three press releases
> Twelve (12) City of SLO Prado Road Interchange Project webpage updates > Eight (8) project information boards/graphics/renderings Task 11.0 - Advisory Body Assistance
The Prado Road Interchange is a significant project for the San Luis Obispo community. Therefore, as the design progresses it is important to check in with City advisory bodies to inform them of the progress and provide them with the opportunity to provide input. During this Task, the Consor team will attend meetings, provide preparation sessions with staff, provide technical content for staff reports, and support City staff. Our scope assumes that the team will attend four (4) Advisory Body meetings. The renderings, conceptual exhibits, and technical content will be developed in various other Tasks in Phase I.

TASK 11.1 - ATTEND FOUR (4) MEETINGS IN PERSON
The Consor Project Manager, Deputy Project Manager, Bridge Project Engineer will be in attendance at four Advisory Body meetings throughout Phase I. The Advisory Bodies could be Planning Commission (PC), Architectural Review Committee (ARC), Chamber of Commerce, Downtown SLO, or the City Council.

TASK 11.2 - LEAD PREP MEETINGS WITH STAFF (8)
Team preparation is important for presentations at committee meetings. The Consor team will lead preparation meetings with City and Caltrans staff prior to committee or council meetings. These meetings will be virtual. We will attend two preparation meetings for each of the four (4) meetings. The meetings will focus on walking through the presentation and discuss questions and issues that could be raised and our team’s responses.

TASK 10.3 - PREPARE TECHNICAL CONTENT FOR STAFF REPORTS (4) The Consor team will provide technical content for the City led staff reports for the Advisory Body meetings. The technical content will focus on project schedule, project costs, design decisions, aesthetic features, project layout, planting palettes, landscape and hardscape elements, bike and pedestrian features. Our team will provide renderings and conceptual plans prepared in previous tasks.

TASK 11.4 - COMMENT RESPONSE TO EACH MEETING (4)
Our goal in attending the Advisory Body meetings will be to answer questions from the committee members. However, there could be some comments or questions that cannot be effectively answered without additional analysis. Our team will document comments, questions and requests made during the meetings. We will prepare a memorandum documenting the comments and our team’s responses to those comments. In the memorandum, our team will identify requests that can be incorporated within the scope and fee and those elements that will necessitate a scope and fee revision.

TASK 11 DELIVERABLES:
> Attendance at four (4) Advisory Body Meetings (in person) > Preparation and Attendance at a total of eight (8) preparation meetings for Advisory Body meetings (virtual) > Technical Content for four (4) staff reports (Word)
> Preparation of four (4) comment response memorandums (PDF)

Page 460 of 504 ends

Detailed Scope
US 101/Prado Road Interchange • City of San Luis Obispo • October 2024 • 21 of 50 Task 12.0 - 50% Submittal
The 50% Submittal will be based on the preferred alternative determined from the Value Analysis. For scoping purposes, we have assumed that Alternative 3A is the preferred alternative. Our team will advance the conceptual drawings to a 50% level.

TASK 12.1 - 50% ROADWAY, SIGNAL, AND LIGHTING PLANS
The 50% plans will include the following sheets:
> Horizontal Alignment
> Vertical Alignment
> Preliminary Right-of-Way
> Preliminary Drainage Design Concept
> Preliminary Storm Water Temporary/Permanent Treatment Concept > Preliminary Traffic Handling/Stage Construction Plan
> Preliminary Landscape Concept Plan
> Preliminary Signal and Lighting
The 50% plans will be prepared in English units and will follow City and Caltrans standards. The design detailed on the plans will address horizontal and vertical alignment, ADA compliance, limits of cut and fill, right-of-way limits (existing and proposed), utilities, proposed drainage, traffic signals, and lighting, traffic handling/ stage construction.

TASK 12.2 - 50% STRUCTURE PLANS
The General Plans for the three bridges (Prado Mainline Bridge, Northbound off-ramp, and Northbound on-ramp) will be updated to include comments received through the Type Selection process. General Plans will be updated and finalized for retaining walls for the preferred wall type based on the approved Type Selection Report. Preliminary foundation sizes, locations, and depths will be determined. We anticipate the following sheets will be prepared for the 50% submittal:

Prado Road Mainline Bridge Sheets
> General Plan (1)
> Structure Plan (2)
> Foundation Plan (2)
> Abutment Layouts (2)
> Abutment Details (2)
> Retaining Wall Layout (4)
> Bent Layouts (3)
> Bent Details (2)
> Typical Section (2)
> Girder Layout (3)
> Barrier Details (1)
Prado Road/US 101 Off-Ramp Bridge Sheets
> General Plan (1)
> Foundation Plan (1)
> Abutment Layouts (1)
> Abutment Details (1)
> Retaining Wall Layout (2)
> Retaining Wall Details (1)
> Bent Layouts (2)
> Bent Details (2)

Page 461 of 504 ends

Detailed Scope
US 101/Prado Road Interchange • City of San Luis Obispo • October 2024 • 22 of 50 > Typical Section (1)
> Girder Layout (1)
> Barrier Details (1)
Prado Road/US 101 On-Ramp Bridge Sheets
> General Plan (1)
> Foundation Plan (1)
> Abutment Layouts (1)
> Abutment Details (1)
> Retaining Wall Layout (2)
> Retaining Wall Details (1)
> Bent Layouts (2)
> Bent Details (2)
> Typical Section (1)
> Girder Layout (1)
> Barrier Details (1)
TASK 12.3 - 50% DRAINAGE AND STORMWATER PLANS
Preliminary Stormwater Treatment Design and Water Pollution Control Design will be included. Plan sheets showing the type, size and location of the Stormwater Treatment elements will be shown as part of the 50% plans. The preliminary layout of the roadway drainage system will be shown on the 50% plans. Initial pipe locations and pipes will be delineated on the plans.

TASK 12.4 - 50% LANDSCAPE PLANS
Based on the design criteria and concept approved in during the Value Analysis and Design Charrettes, we will prepare preliminary planting and irrigation plans in general conformance to City, and Caltrans standards. Planting Plans will provide plant schedule, planting types, sizes, quantities, and locations. A draft Tree Protection and Replacement Plan will be prepared for review and approval. Preliminary erosion control hydroseed mix designs and notes will be developed for use in the erosion control plans. Irrigation plans will provide the irrigation mainline and equipment types but will not include valve layout and water demand calculations at this level of design.

TASK 12.5 - 50% WET UTILITY PLANS
The Consor team has assumed the Sewer Main will be relocated to follow the new Elks Lane and the Water Main will also be relocated. This scope may be revised depending on the outcome of the Value Analysis and Utility Meetings with City Staff. The 50% plans will include Plan and Profile sheets for the Sewer Main and Water Main relocations.

TASK 12.6 - ENGINEER’S ESTIMATE
A preliminary Engineer’s Opinion of Probable Construction Cost will be prepared based on the 50% plans. Preliminary quantities will be taken. A contingency of 25% and an escalation of 5% per year will be utilized. Relevant unit bid information will be acquired from Caltrans “As-Bid” databases and adjusted as deemed appropriate to better represent anticipated project costs.

TASK 12.7 - MEETINGS WITH 3RD PARTY REVIEWER
The City will be contracting separately with a 3rd party to review the 50% submittal. Our team will meet virtually with the 3rd party reviewers and the City to review the submittal and subsequent comments. We envision the first meeting will be a walk-through of the prepared plans, including discussing assumptions and design decisions agreed on. The second meeting will focus on a review of the comments provided and our team’s responses. The third meeting will be prior to our final 50% submittal to discuss the 3rd party’s final comments and how our team will address those comments. At each

Page 462 of 504 ends

Detailed Scope
US 101/Prado Road Interchange • City of San Luis Obispo • October 2024 • 23 of 50 submittal, our team will prepare a comment response form. The form will include the location of the comment, a summary of the comment, who is responsible for the response, and the response to the comment.

TASK 12.8 - RESPONSE TO COMMENTS (2)
A Draft 50% Submittal will be made to the City and Caltrans for their review. Our team has assumed we will receive consolidated comments. We will address these comments and submit a Draft Final 50% submittal, which will be reviewed.

Upon receiving the second set of consolidated comments, the team will address the applicable comments and submit a Final 50% submittal. At each submittal, our team will prepare a comment response form. The form will include the location of the comment, a summary of the comment, who is responsible for the response, and the response to the comment.

TASK 12 DELIVERABLES:
> Draft, Draft Final, and Final 50% Plans (PDF)
> Engineer’s Opinion of Probably Construction Cost (PDF, Excel) > Attendance at three (3) plan review meetings (virtual) > Two (2) Comment Tracking Matrices (PDF, Excel or Word) Task 13.0 - Phase I Finalization
TASK 13.1 - SCOPING DOCUMENT - PHASE I
At the conclusion of Phase I, the team will prepare a technical memorandum summarizing the design criteria for the project, a list of design exceptions, not already identified previously, findings and decisions made during the Value Analysis, Geotechnical findings, Stormwater and Drainage design decisions, wet utility relocations, recap of Public Meeting and Advisory Body comments, and recommendations for LEED/Envision and Sustainability improvements to be incorporated into the project. This document will serve as the basis for the Scope of Work for Phase II.

TASK 13.2 - PHASE II SCOPE, SCHEDULE, FEE
Upon completion of the Scoping Document Memorandum, the Consor team with the City and Caltrans input, will review the Scope, Schedule and Fee for Phase II. We will work with the team to revise to our original scope, including deliverables and provide it to the City for their review and approval. Once the revised scope has been approved, the fee will be modified to match the approved scope of work. A schedule will be prepared for Phase II during this task.

TASK 13 DELIVERABLES:
> Phase I Scoping Document Memorandum (PDF)
> Draft and Final Scope of Work, Schedule and Fee (Phase II)

Page 463 of 504 ends

Detailed Scope
US 101/Prado Road Interchange • City of San Luis Obispo • October 2024 • 24 of 50

PHASE II - PS&E DEVELOPMENT
The following scope for Phase II is based on Consor’s Alternative 3A being the preferred alternative. At the conclusion of Phase I, the scope for Phase II will be updated accordingly.

Task 14.0 - Project Management and Meetings - Phase II
TASK 14.1 - PROJECT MANAGEMENT
Consor will perform the activities necessary to plan, direct, and coordinate the work on this phase of the project. Consor will provide project management for each task for the entire duration of the agreed upon schedule. Consor assumes the duration of work for Phase II will not exceed 36 months.

Consor will submit monthly progress reports outlining all activities for which expenses are submitted. All activities will be itemized by task and will be consistent with the agreed upon Scope of Services. Progress Reports will include the following:
> Status of work completed to date
> Expense allocation by task
> Work anticipated to be completed in the next reporting period > Identification of project issues, actions to resolve those issues, and the responsible party to drive resolution Project Correspondence and Project Files: All correspondence by and between Consor, the City, other agencies and parties will be recorded and filed for complete record keeping. Meeting notes, telephone record logs, incoming/outgoing correspondence, and all deliverables will be logged and filed. Any outside correspondence will be coordinated with and approved by the City’s project manager. Project files will comply with the Caltrans uniform filing system as outlined in the Project Development Procedures Manual: This will facilitate transmitting the Project History File to the City during the future close out phase of the project. Consor will provide weekly updates on progress to the City Project Manager. These updates will take the form of either e-mails or virtual meetings depending on the need for information.

Design Decision Log: Consor will disseminate up-to-date information to the project team at the PDT meetings. A Design Decision log will be prepared for items such as requests for information, documentation of decisions made as the project progresses in development, and deliverable status.

Caltrans Quantitative Risk Register: Throughout the project development process the Consor team will maintain a risk register that complies with Caltrans latest guidance.

TASK 14.2 - CLIENT FOCUS MEETINGS
Consor assumes monthly technical coordination meetings will be needed with the City and other outside agencies for a total of thirty-six (36) meetings. These meetings will focus on project status updates, items requiring City input and direction. We have assumed that these meetings will be held virtually.

TASK 14.3 - PDT/COORDINATION MEETINGS (CALTRANS) (15)
PDT meetings will be scheduled every other month and held via telephone or video conference with the goal of keeping the project on track and to keep the City and Caltrans informed of the status of the project. Two of these meetings would focus on the coordination and review of the Caltrans permanent changeable message sign project. Consor assumes that PDT meetings will be one-hour in duration. This scope assumes a total of fifteen (15) PDT meetings.

TASK 14.4 - PROJECT SCHEDULE UPDATES
Consor will update a project schedule at major milestones and at least every six months. The schedule will be developed using MS Project. The schedule will indicate critical path activities and major milestone deliverables.

TASK 14.5 - CITY COUNCIL MEETING
The Consor team will attend one City Council meeting to present an update on the project. The Project Manager, Deputy

Page 464 of 504 ends

Detailed Scope
US 101/Prado Road Interchange • City of San Luis Obispo • October 2024 • 25 of 50 Project Manager, Bridge Project Engineer, Roadway Project Engineer, and Bridge Architect will attend and present an update and project status to the Council. We anticipate that the meeting will focus on the corridor aesthetics, hardscape, landscape, overall look and feel of the improvements. In addition, we will provide an update to the project timeline and project costs. We will be available to answer the Council’s and public’s questions about the improvements.

It is assumed that the Consor team with the City will provide a short presentation to the City Council. Our team will take notes during the presentation and note action items and comments made.

TASK 14.6 - QA/QC
As required by the COOP Agreement between the City and Caltrans a QMP must be prepared for each component phase, Consor will develop, establish, and keep updated a project specific Quality Management Plan (QMP) that will include procedures and timetables for conducting independent quality reviews for all reports, plans, estimates, and design documents. A big part of our team’s QMP will be supplemented by Brian Ray of Sunrise Transportation Strategies. Brian will be providing his expertise to the roadway geometrics of the interchange. This will:
> Permit adherence to the QMP by both Consor and our subconsultant team throughout the course of this phase of work
> Initiate and document quality reviews and address corrective actions > Conduct quality audits to ensure quality control procedures are strictly followed and properly documented.
> Perform a thorough review and verification of corrections by an independent reviewer TASK 14 DELIVERABLES:
> Attendance, Meeting Agendas and Notes for Client Focus Meetings (36) > Attendance, Meeting Agendas and Notes for PDT Meetings (15) > Design Decision Logs
> Updated Risk Register
> Monthly Progress Reports and Invoices
> Project Schedule (at milestone submittals and at least every 6 months) in Microsoft Project and PDF Format > Attendance, presentation materials, and notes for one (1) City Council Meeting > Project Correspondence
> Compliance Assistance as Needed
Task 15.0 - Grant Assistance (Phase II)
Grant support efforts during Phase II of the project development, assumed to be years 2 through 4, will comprise an annual update of the funding scan/funding strategy in which it will be amended to address changes to the mix of suitable programs as well as a reevaluation of the Project’s alignment with the funding program’s sought-after outcomes and merit criteria.

TASK 15.1 - YEARLY GRANT OPPORTUNITY/APPLICATION MEMO
Each year AECOM will update the Grant Opportunity Memo and spreadsheet to include revisions to funding programs that are suitable for the project. The team will continue to meet with City, Caltrans and SLOCOG to review the latest funding scans and strategies. We have assumed three (3) virtual meetings as part of this task.

TASK 15.2 - GRANT APPLICATION ASSISTANCE
Additional grant application support during Phase II will be analogous to that performed in Phase I and it is assumed that one grant application will be developed each year for a total of three (3). Some core material from the first grant application can be repurposed across subsequent grant applications, though the application could vary significantly from previous if seeking funding for only specific components of the Project. Project positioning and supporting analytics will

Page 465 of 504 ends

Detailed Scope
US 101/Prado Road Interchange • City of San Luis Obispo • October 2024 • 26 of 50 need to be updated for each application.

TASK 15 DELIVERABLES:
> Three (3) Grant Opportunity Memo (Word and Excel)
> Attendance at three (3) virtual meeting
> Three (3) Grant Applications (PDF)
Task 16.0 - Utility Coordination (Phase II)
Consor will continue to provide utility coordination by working with the utility agencies identified in the survey mapping completed as part of Task 4 of Phase I and those identified in Task 8 of Phase I of the project. Consor will coordinate potential utility relocations (underground, wet and dry utilities) needed to construct the project.

Consor will follow Caltrans Local Assistance Procedures Manual (LAPM) Chapter 14 guidelines to prepare a Utility Report of Investigation (Exhibit 14-E). The ROI package shall include:
> Color-coded plan showing existing and proposed right-of-way lines and existing and proposed utility facilities > Utility Agreement per LAPM 14-B
> Reports of Investigation for each impacted utility requiring relocation submitted to the City and Caltrans prior to requesting the utility to relocate
> A conflict map identifying impacted utilities
> Relocation plan prepared by the project engineer or Utility > Itemized estimate of City relocation costs
Per LAPM Chapter 14 requirements, the ROI will be submitted to Caltrans for approval prior to submitting the Right-ofWay certification.

TASK 16.1 - MEETINGS WITH AFFECTED UTILITIES (2 MEETINGS PER UTILITY, INCL CITY WET UTILITIES. 1 IN PERSON, 1 VIRTUAL)
As a continuation of the Utility Coordination in Phase I, Consor’s Utility Task Lead will will meet with the dry utilities one more time on site and one additional times virtually to discuss the status of the relocation, answer questions regarding relocation costs and timing.

Consor’s wet utility task lead will meet in person once and once virtually with City staff to discuss the wet utility relocations specifically.

TASK 16.2 - UTILITY COORDINATION - DRY UTILITIES TO UNDERGROUND Our task lead will meet with the affected utilities three (3) times (two in person and one virtually) during this task to determine right-of-way needs. Our team will work with the utility companies to provide a sketch to Wallace Group for the preparation of legal descriptions and exhibits for the utility agreements and recordation.

The utility company will complete the design of the utilities’ undergrounding for temporary and permanent relocation.

Consor will provide input and review to these design plans so that they are coordinated with the overall project design and wet utility relocations.

TASK 16.3 - REVIEW MEETINGS (5 MEETINGS WITH EACH AFFECTED UTILITY INCL CITY UTILITIES) The Consor Utility Task Lead and Wet Utility Task Lead will lead five (5) virtual meetings with each affected utility. Agendas, meeting notes, including action items with due dates will be prepared for each meeting. The focus of these meetings will be to check in on the relocation plans’ progress, provide comments, and discuss resolution to comments with the utility companies.

Page 466 of 504 ends

Detailed Scope
US 101/Prado Road Interchange • City of San Luis Obispo • October 2024 • 27 of 50 TASK 16.4 - “B” LETTERS
The “B” Letters serve as a liability determination for each utility company. These letters can be prepared on City letterhead and City signature or on Consor letterhead and signature. We will include our Reports of Investigation for each impacted utility requiring relocation.

TASK 16.5 - UTILITY AGREEMENT PREPARATION
Consor will prepare draft utility agreements for each impacted utility and coordinate issues as necessary to obtain signed agreements from each utility. The agreements will be prepared per LAPM Chapter 14 Exhibit 14-F.

TASK 16.6 - “C” LETTERS
Consor will issue Notice to Owner (“C” Letters) to all impacted utilities that will clearly define the impacted facility and the required completion date for all relocation activities. Notice to Owners shall be prepared per LAPM Chapter 14 Exhibit 14-D.

TASK 16.7 - UTILITY AGREEMENT SIGNATURES
Consor will work with the utility companies and the City and Caltrans to obtain signatures on the Utility Agreements. This task includes one (1) meeting with each impacted utility to discuss comments and requested revisions to the utility agreements. This task assumes two revisions to each of the Utility Agreements.

TASK 16 DELIVERABLES:
> Preparation of ROI package
> Review and Comments of Undergrounding Relocation Plans (Temporary and Permanent) – Three rounds of review > Attendance, Agendas, Meeting Notes, and Action Items for Two (2) (one in person, one virtual) with each impacted utility, including City Wet Utilities.
> Attendance, Agendas, Meeting Notes, and Action Items for Three (3) (two in person, one virtual) with each of the dry utilities to be undergrounded)
> Attendance, Agendas, Meeting Notes, and Action Items for Five (5) virtual meetings with each impacted utility, including City wet utilities.
> Preparation of “B” Letters
> Administrative Draft, Draft, Draft Final, and Final Signed Utility Agreements > Preparation of “C” Letters
Task 17.0 - ROW Coordination
TASK 17.1 - FINAL ROW NEEDS MAP (INCL UNDERGROUND UTILITIES) Consor will develop a map showing the areas needed for permanent and temporary rights-of-way. The map will identify visually the areas and include a table indicating property owner, APN, area of temporary and area of permanent. The map will include the needs for utility relocations including undergrounding We will prepare a draft, draft final, and final needs map for City and Caltrans review and comment.

Task 17.1.1 - Legal Descriptions and Exhibit Maps
Based on the Final ROW needs map, Wallace Group will provide legal descriptions and exhibit maps for needed the project’s right of way and easement acquisitions. For budgeting purposes, we have assumed that up to 15 legal descriptions and exhibit maps will be required. This includes one (1) draft submittal, responding to one (1) set of unified comments, and delivering one signed and sealed submittal.

TASK 17.2 - SURVEY STAKING OF POTENTIAL ROW TAKES
Our team will provide field staking for the proposed right of way takes. We will coordinate with the City prior to the field

Page 467 of 504 ends

Detailed Scope
US 101/Prado Road Interchange • City of San Luis Obispo • October 2024 • 28 of 50 staking to determine which proposed takes require staking and how the staking should appear, if any particulars are required. As this effort will take place often on private property, we will closely coordinate and schedule these activities while communication with the City. Upon completion of the field work we will provide the City with a point plot showing the locations of the stakes. For budgeting purposes, we have included three field survey days and associated office support to complete this task. We have also assumed that this task will not require staking on existing property lines and will not therefore require a possible record of survey map and setting monuments.

TASK 17.3 - PROPERTY OWNER INTRODUCTION MEETINGS (2 PER OWNER) Hamner, Jewell & Associates (HJA) will support the Consor team with the right-of-way acquisition process. HJA will first contact property owners with an introductory letters and proactive outreach by telephone to schedule introductory meetings in person with each property owner. The first meeting will be held early in the design process and a right of way agent will present the plans and discuss the project with the owners and gather any questions or concerns which can be communicated back to the design team. The second set of meetings with each property owner will be preceded by a Notice of Decision to Appraise letter. These meetings will include the property owner, the appraiser and a right of way agent which will give the owner an opportunity to present background information about their property to the appraiser.

TASK 17.4 - APPRAISALS
Due to the general value of commercial land in the area and the proposed impacts, we believe we will need to obtain appraisals and appraisal reviews for each property requiring purchase of right-of-way. If any of the required areas fall under the expected value of $10,000 once we receive final project plans and area calculations, then we can certainly conduct a waiver valuation to value those non-complex acquisitions to save on project time and budget. Appraisal preparation process then includes the following steps:
> Appraiser will review title information pertaining to respective ownerships and will review project plans and other pertinent information relative to the parcel.
> Appraiser will review the proposed acquisition deed to evaluate the rights being acquired, including permanent and temporary easement rights.
> Appraiser will inspect each property personally with the owner and right of way agent and document the inspection with photographs for use in the report.
> Appraiser will inventory all improvements affected by the proposed acquisition, including notes on their manner of disposition (i.e., pay-for and remove vs. restoration by project contractor). > Appraiser will analyze any severance damages, determine whether curable or incurable, and gather data to support the conclusion. This process may involve obtaining bids from specialists for cost to cure work or using industry standard references for establishing replacement and restoration costs. > Appraiser will perform market research to support the selected appraisal methodologies and will document and confirm comparable sales information.
> Appraiser will prepare a narrative appraisal report that conforms to the Uniform Standards of Professional Appraisal Practice (USPAP). The appraisal study and report are intended to serve as an acquisition appraisal and will be prepared in a summary format consistent with the specifications for narrative appraisal reports. > Upon completion of the appraisal report, HJA coordinates a formal appraisal review by an independent appraiser in accordance with federal regulations. > HJA reviews and analyzes the completed appraisal reports carefully for accuracy and logic; forward the appraisals to the client for review after this internal quality control and assessment process is completed.

TASK 17.5 - DRAFT OFFER PACKAGES
Once the appraisal process is complete, appraisals are reviewed and pre-approved by the City, and review appraisals done per federal guidelines, we would then prepare offer packages for each owner that will include an offer letter,

Page 468 of 504 ends

Detailed Scope
US 101/Prado Road Interchange • City of San Luis Obispo • October 2024 • 29 of 50 Appraisal Summary Statement, proposed Right of Way Agreement, and Deed. These documents would be presented to the City for your review and pre-approval prior to presenting offers to property owners.

TASK 17.6 - ATTEND TWO (2) CITY COUNCIL CLOSED SESSION MEETINGS (OFFERS) Consor’s project manager and HJA project management will attend two (2) City Council closed session meetings to assist the City in presenting the offer packages for preapproval by City Council. We will be prepared to answer any questions about the appraisal, the right of way acquisition process and how we plan to address owner or Council concerns about the project’s right-of- way impacts, if necessary.

TASK 17.7 - PROPERTY OWNER OFFER MEETINGS (2 PER OWNER) Once offers are City approved and the City sets just compensation by signing the appraisal summary statements, HJA Right of Way Agents will present purchase offers in person to each property owners. If owners do not sign at offer presentation, we will set a follow up meeting in person to follow up on the owner’s consideration of the offer. We will continue to coordinate with each owner in person, by phone, email or whatever method each owner prefers until we are able to reach amicable agreements and collect owner signatures on the Agreement, deed and any additional documentation that may be needed based on the specifics of the property. We will coordinate and work closely with the City and project team to ensure that all agreements and negotiations are preapproved before accommodating changes to the initial offers. For purchase efforts that do not culminate in mutually acceptable amicable agreements, we can amend our scope and fee to coordinate with the City Attorney’s office with any required Necessity Hearing scheduling.

TASK 17.8 - ATTEND TWO (2) CITY COUNCIL CLOSED SESSION MEETINGS (AUTHORIZE PAYMENT) Consor’s project manager and HJA project management will attend two (2) City Council closed session meetings to assist staff in presenting final settlements for approval by City Council. We will be prepared to answer any questions about negotiations and support any settlements with data and reason.

TASK 17.9 - ROW AGREEMENTS AND CREATE ESCROW ACCOUNTS
The Consor team will work with First American Title Company in San Luis Obispo on processing all escrows. For those owners who reach final agreements, we would process all documents for necessary approvals and coordinate escrows, title insurance, and closings. It is always our goal to reach cooperative agreements in lieu of eminent domain litigation on the City’s behalf. We have a great track record of successfully reaching agreements on the agency’s behalf, minimizing or eliminating the need for eminent domain action.

TASK 17 DELIVERABLES:
> Draft, Draft Final and Final Right-of-way needs map (PDF) > One draft submittal of legal descriptions and exhibit maps > One signed and sealed submittal of legal descriptions and exhibits map > Field staking of right of way takes
> Point plot exhibits showing the right of way take stake locations. > Attendance and meeting notes at two (2) meetings with impacted Property Owners > Appraisals for each permanent take of right-of-way (estimate 15 parcels) > Draft Offer Packages (estimate 15 packages)
> Attendance at two (2) City Council closed session meetings (offers) > Attendance and meeting notes at two (2) meetings with impacted Property Owners to present offers > Attendance at two (2) City Council closed session meetings (authorize payment) > Creation of Escrow accounts (estimate 15 accounts)

Page 469 of 504 ends

Detailed Scope
US 101/Prado Road Interchange • City of San Luis Obispo • October 2024 • 30 of 50 Task 18.0 - 65% PS&E Package
TASK 18.1 – 65% ROADWAY DESIGN AND PLANS
Consor will prepare design plans based on the approved 50% Plans developed in Phase I. The Title Sheet will include the appropriate City project identification, as well as a sheet schedule, a vicinity map, the project legend, general notes, project control points, and appropriate signature approval blocks. The roadway Typical Section Sheet will include the roadway structural section as designed, and the recommendations of the Geotechnical Report indicating the R-value. Plan, Profile, and Superelevation sheets will be produced. The plan view will delineate the general roadway improvements and pavement dimensions. Geometric information, tied to the project control points, will be shown to sufficiently describe both the horizontal and vertical alignments. Utility locations, re-grading and conforming details will be shown. Roadway design will be performed in AutoCAD Civil 3D highway design package utilizing Caltrans drafting standards. Plan sheets will be prepared in AutoCAD (DWG) file format. Details necessary to construct the roadway, including grading, drainage, pavement structural sections, etc. will be developed.

The roadway design will be prepared in accordance with City Standards and the Caltrans Highway Design Manual. All plans will be signed by the civil engineer (registered in the state of California) in responsible charge of the design. Our team estimates the project plans to consist of the following Roadway, Drainage, Stormwater Treatment, Signal/Lighting, Wet Utility Plan Sheets
> Title Sheet- 1
> Typical Cross Sections- 5
> Project Control- 5
> Layout- 12
> Profile and Superelevation Diagram- 7
> Construction Details- 14
> Contour Grading- 12
> Erosion Control Plans and Quantities- 12
> Drainage Plans- 12
> Drainage Profiles- 16
> Drainage Details- 4
> Drainage Quantities- 2
> Utility Plans- 9
> Construction Area Signs- 1
> Stage Construction Plans- 5
> Traffic Handling Plans, Details and Quantities- 28
> Pavement Delineation Plans, Details and Quantities – 12 > Slurry Seal Limits Plans- 2
> Sign Plans, Details and Quantities- 10
> Summary of Roadway Item Quantities- 2
> Lighting, Signal Modification and Electrical Plans, Details and Quantities- 28 > Landscape and Irrigation Plans, Details and Quantities- 28 TASK 18.2 - 65% DRAINAGE AND STORMWATER PLANS
The 50% drainage and stormwater plans will be updated to incorporate comments and revisions from Phase I. HDR will lead the revisions to these plans. The team will coordinate the location of the existing and relocated utilities with HDR to avoid conflicts with the roadway drainage system and the location of the stormwater treatment areas.

Page 470 of 504 ends

Detailed Scope
US 101/Prado Road Interchange • City of San Luis Obispo • October 2024 • 31 of 50 TASK 18.3 - 65% WET UTILITY PLANS
Our scope assumes that the existing sewer line located within existing Elks Lane will be relocated along the new Elks Lane alignment. We have also assumed that the water line in Elks Lane will be relocated as well. Plan and Profile sheets will be advanced based on comments from the City water and wastewater staff and detail sheets will be created. Both will be included in the 65% plans submittal.

TASK 18.4 - 65% BRIDGE AND RETAINING WALL PLANS
Consor will prepare structural design calculations on the preferred bridge and adjacent walls alternative identified in the approved Bridge Type Selection Report. The design will be prepared in accordance with the Caltrans Bridge Design Manuals and Load Resistance Factor Design following AASHTO LRFD Bridge Specifications, 8th Edition with the California Amendments. For seismic design, Caltrans Seismic Design Criteria (Version 2.0) will be followed. Other references that Consor will follow are Caltrans Division of Structures “Bridge Memo to Designers”, “Bridge Design Aids”, “Bridge Design Details” and the “Office of Specially Funded Projects Information and Procedure Guide”. Our partner Apexx will prepare detailed plans for the preferred aesthetic treatments on the bridge elements as part of this task. Our team estimates the project plans to consist of the following Structure Plan Sheets:

Prado Road Mainline Bridge Sheets
> General Plan (1)
> Deck Contour (1)
> Structure Plan (2)
> Foundation Plan (2)
> Abutment Layouts (2)
> Retaining Wall Layout (4)
> Retaining Wall Details (6)
> Abutment Details (3)
> Bent Layouts (3)
> Bent Details (3)
> Typical Section (2)
> Girder Layout (3)
> Girder Details (4)
> Barrier Details (1)
> Aesthetic Details (4)
> Log of Test Boring Details (1)
Prado Road/US 101 Off-Ramp Bridge Sheets
> General Plan (1)
> Deck Contour (1)
> Foundation Plan (1)
> Abutment Layouts (1)
> Retaining Wall Layout (2)
> Retaining Wall Details (2)
> Abutment Details (2)
> Bent Layouts (2)
> Bent Details (2)
> Typical Section (1)
> Girder Layout (1)
> Girder Details (1)

Page 471 of 504 ends

Detailed Scope
US 101/Prado Road Interchange • City of San Luis Obispo • October 2024 • 32 of 50 > Barrier Details (1)
> Aesthetic Details (2)
> Log of Test Boring Details (1)
Prado Road/US 101 On-Ramp Bridge Sheets
> General Plan (1)
> Deck Contour (1)
> Foundation Plan (1)
> Abutment Layouts (1)
> Retaining Wall Layout (2)
> Retaining Wall Details (2)
> Abutment Details (2)
> Bent Layouts (2)
> Bent Details (2)
> Typical Section (1)
> Girder Layout (1)
> Girder Details (1)
> Barrier Details (1)
> Aesthetic Details (2)
> Log of Test Boring Details (1)
TASK 18.5 - 65% LANDSCAPE PLANS
The 50% Landscape plans will be advanced to a 65% level based on the preferred alternative determined in Phase I.

Planting and irrigation plans, details, and notes in general conformance to City, Caltrans, standards, and formatting, as applicable will be updated. Planting Plans will provide plant schedule, planting types, sizes, quantities, and locations. We will include a Tree Protection and Replacement Plan to meet the project’s needs in this submittal as well. Updated erosion control hydroseed mix designs and notes for use in the erosion control plans will be provided. Irrigation plans will provide irrigation equipment types, layout, and water demand calculations as required for landscape water efficiency ordinances and Caltrans review. The irrigation plans development will assume that a point of connection is available for use.

TASK 18.6 - TECHNICAL SPECIFICATIONS LIST
Consor will use the most current version of the Standard Special Provisions available from Caltrans and will edit the Standard Special Provisions to meet the requirements for this specific project. The special provisions document will be developed using Microsoft Word and edited and complied according to Caltrans standards. Our assumption is the project would be advertised, awarded and administered by the City and as such the City would provide the front end boiler plate for the project prior to the 90% PS&E submittal.

TASK 18.7 - 65% ENGINEER’S ESTIMATE
An Engineer’s Opinion of Probable Construction Cost will be prepared as part of the 65% submittal. One set of quantities for the roadway, structures, drainage, stormwater treatment, lighting and signals, landscaping, and wet utilities will be completed. Unit prices will be assigned utilizing Caltrans bid data, recent City bid data, and our judgement. Caltrans BEES items will be used.

TASK 18.8 - DRAFT FINAL BRIDGE DESIGN HYDRAULICS REPORT HDR will update the San Luis Obispo Creek hydraulic analysis developed for the Preliminary Floodplain and Bridge Design Hydraulic Study (BDHS) Report, using the 65% design information, including documenting Project impacts on the floodplain.

HDR will update the bridge scour analysis to determine the scour potential according to the methodology specified in the

Page 472 of 504 ends

Detailed Scope
US 101/Prado Road Interchange • City of San Luis Obispo • October 2024 • 33 of 50 FHWA HEC-18 and HEC-20 manuals. HDR will make recommendations on the need for scour countermeasures for the proposed improvements per the FHWA HEC-23 and Caltrans’ HDM.

TASK 18.9 - DRAFT FINAL STORMWATER DATA REPORT
A Stormwater Data Report will be prepared and will summarize the Project impacts on water quality and recommended BMPs. We will propose the permanent stormwater treatment BMPs for the Project. The report will be based on the Phase I report and will be updated with the development of the PS&E. HDR will perform detailed calculations to prepare the design and detail usage of the treatment BMPs.

TASK 18.10 - DRAFT DRAINAGE REPORT
The team will review and research available data on the existing and proposed drainage facilities and will prepare design calculations to assess the capacity of the proposed drainage systems. A Drainage Report will be prepared to evaluate the hydrologic and hydraulic conditions of the proposed drainage systems to accommodate the proposed Project improvements. The report will document the hydrologic and hydraulic design criteria as well as the procedures used for the drainage design.

The results and design recommendations will be summarized in the Drainage Report, which is expected to include the following:
> Evaluation of the existing conditions, including:
• Research into downstream controlling conditions for locations where the Project connects directly to off- site storm drains,
• Evaluation of inlet interception capacities for systems impacted by the Project, and • Hydraulic analyses of proposed hydraulic conditions for systems impacted by the Project; > Identification of drainage deficiencies;
> Evaluation of spread widths at proposed inlets;
> Improvements to address drainage deficiencies; and
> Drainage mapping.

TASK 18.11 - DRAFT FINAL FOUNDATION AND GEOTECHNICAL REPORT The geotechnical services for Phase II will include a Geotechnical Design Report (GDR), Foundation Report (FR) for both the Earth Retaining Structures and the US 101 OC/Ramp structures. This is consistent with Caltrans project requirements.

Task 18.11.1 - Draft Geotechnical Design Report (GDR)
This work will include planning, field exploration, laboratory testing, and performing geotechnical analyses for preparation of the GDR. Field exploration will also be performed under this task for the proposed earth retaining structures and overcrossing structure and ramps. The scope of the field exploration and testing programs assumes that the work will be performed under a single mobilization and effort. > Submit a Field Exploration Plan showing the locations and depth of borings and describing the field work to be performed. Prepare and submit a Caltrans Encroachment Permit (Dual Permit) application for work within the Caltrans right-of-way that will address field work. An encroachment permit will also be submitted for work within the City of San Luis Obispo right-of-way. Prepare a health and safety plan (HASP) for the field work, visit the site to mark the locations of borings and contact Underground Services Alert (USA) to mark utilities prior to beginning the field exploration program. Yeh will then coordinate field exploration with the drilling and traffic control subcontractors, update the encroachment permit from Caltrans or the City if needed, obtain well permits for applicable borings from San Luis Obispo County.
> Perform a field exploration program for the proposed improvements. Traffic control will be provided by a

Page 473 of 504 ends

Detailed Scope
US 101/Prado Road Interchange • City of San Luis Obispo • October 2024 • 34 of 50 subcontractor (Avila Traffic Safety of Atascadero, California) > Unusual and special conditions; will follow the Caltrans and City approved traffic control plan(s). It is anticipated that lane closures on Prado Road and Elks Lane will be needed and shoulder closures along US 101 will be performed. Drilling will be subcontracted to Britton Exploration of Los Gatos, California. Britton will provide track-mounted drill rigs equipped with hollow-stem augers, mud rotary and rock coring equipment to perform the drilling depending on the location of the borings. Borings will be sampled with Standard Penetration Test, California Modified, and Shelby Tube samplers. Rock coring using HQ-size core barrels will be used once bedrock is encountered. Yeh will log the borings and recover soil and rock samples for laboratory testing. The field exploration is expected to occur over a period of 30 working days. The table below summarizes proposed borings for the project. Yeh will coordinate with Rincon for sampling of soil for ADL testing where practicable.
> The final depths and numbers of borings may be varied depending on the field conditions encountered and the proposed design layout for Alternative 3A. Borings will be backfilled with cement bentonite grout and capped with rapid setting concrete colored black or as approved by the Caltrans Permit Engineer if they are within the pavement. Borings within the City right-of-way will be backfilled with either native cuttings or cement bentonite grout per County well permit standards. Excess cuttings will be drummed and temporarily stored near the site and then hauled off for disposal.
> Perform laboratory tests for soil classification, grain size, strength, compaction, corrosivity, consolidation, and R-values on selected samples recovered from the borings.
> Yeh will review the data obtained from the field exploration and laboratory testing, perform preliminary geotechnical analyses, and prepare a draft Geotechnical Design Report (GDR) for the design of the embankments, roadway improvements, pavements, and storm water infiltration. The report will include the project understanding, work performed, and a description of the subsurface conditions encountered, boring logs, laboratory test results, and graphics showing the site and boring locations. The report will provide conclusions and recommendations regarding:
• Project description;
• Geotechnical exploration and laboratory testing;
• Geotechnical conditions including:
» Site geology;
» Surface conditions;
» Subsurface conditions encountered;
» Groundwater; and
» Seismic hazards evaluation including site seismic and ground motion parameters developed from ARS-online, seismic parameters for slope stability analyses, as well as potential for fault rupture, liquefaction, and liquefaction induced lateral spreading.
• Geotechnical analyses and design recommendations for:
» Soil and rock engineering properties;
» Geotechnical model and analyses performed;
» Suitability of the native soil materials encountered for reuse on-site;

Page 474 of 504 ends

Detailed Scope
US 101/Prado Road Interchange • City of San Luis Obispo • October 2024 • 35 of 50 LOCATION NO. BORINGS/DEPTHS PURPOSE NOTES
Pavement borings — various
locations
Up to 6 borings @ 5 and one to
20 ft.

Measure existing pavement
sections, subgrade sampling
Traffic control = lane closure as
needed
Earth Retaining Structures:

NB Off-Ramp, West: 190 ft long
NB Off-Ramp, East: 190 ft long
NB On-Ramp, West: 230 ft long
NB On-Ramp/Auxiliary Lane:
1,600 ft long
6 borings @ 40 ft.

Exploration for Earth Retaining
Structures
Traffic Control = Lane or Shoulder
Closure;
Monitoring wells will be installed
in two of the borings with
pressure transducers to record
groundwater levels during design
Overcrossing Structure/Ramps:
4 Abutments and 10 Bents
14 borings @ 150 ft.

Exploration for Overcrossing
Structure
Traffic Control = Lane or
Shoulder Closure
Infiltration Test Borings 6 borings up to 10 ft.

Exploration and Infiltration
Testing for Storm Water Basins
No Traffic Control
» Subgrade conditions encountered in roadway areas, suitability to support pavements, and for subexcavation and stabilization of the subgrade, if needed;
» Site preparation for embankment fill and pavement areas; » Allowable slope inclinations for cut slopes and embankments; » Erosion and drainage requirements for cut and fill slopes; » Earthwork factors for on-site materials used as compacted fill; » Overhead sign foundations (if needed);
» Corrosion considerations for culverts and other concrete substructures; » Stormwater infiltration data;
» Structural section for asphalt pavements based on R-value testing and provided traffic indices; » Notes for Specifications or reference to standard specifications for materials discussed in the report (compacted fill, asphalt concrete, base and subbase courses, bedding, pipe zone, and trench backfill); and » Notes for Construction and special provisions regarding temporary slopes, reuse of excavated onsite soil or rock for retaining walls, and groundwater.

Task 18.11.2 - Draft Foundation Report (FR) for Earth Retaining Structures Yeh will prepare a draft Foundation Report (FR) for the design of earth retaining structures (ERS) for the project. The scope is based on Consor’s Alternative 3A and may need to be updated as needed at the end of Phase I. Field exploration and laboratory testing for the proposed ERS will be performed under task 17.11.1. The report will provide conclusions and recommendations regarding:
> Project description including location, wall heights and types; > Geotechnical exploration and laboratory testing;
> Geotechnical conditions including:
• Site geology;

Page 475 of 504 ends
← All documents from this meeting