selected by a blind draw. The cost of mediation shall be borne equally by the parties. Neither party shall be deemed the prevailing party. No party shall be permitted to file a legal action without first meeting in mediation and making a good faith attempt to reach a mediated settlement. The mediation process, once commenced by a meeting with the mediator, shall last until agreement is reach by the parties but not more than 60 days, unless the maximum time is extended by the parties.
ARTICLE 13 - TESTS AND INSPECTIONS; CORRECTION OF DEFECTIVE WORK
13.01 Tests and Inspections
A. Owner and RPR will have access to the Site and the Work at reasonable times for their observation, inspection, and testing. Contractor shall provide them proper and safe conditions for such access.
B. Contractor shall give RPR timely notice of readiness of the Work for all required inspections and tests and shall cooperate with inspection and testing personnel to facilitate required inspections and tests.
C. If any Work that is to be inspected, tested, or approved is covered by Contractor without written concurrence of RPR, Contractor shall, if requested by RPR, uncover such Work for observation. Such uncovering shall be at Contractor’s expense.
13.02 Defective Work
A. Contractor shall ensure that the Work is not defective.
B. RPR has the authority to determine whether Work is defective, and to reject defective Work.
C. Prompt notice of all defective Work of which Owner or RPR has actual knowledge will be given to Contractor.
D. The Contractor shall promptly correct all such defective Work.
E. When correcting defective Work, Contractor shall take no action that would void or otherwise impair Owner’s special warranty and guarantee, if any, on said Work.
F. If the Work is defective or Contractor fails to supply sufficient skilled workers or suitable materials or equipment, or fails to perform the Work in such a way that the completed Work will conform to the Contract Documents, then Owner may order Contractor to stop the Work, or any portion thereof, until the cause for such order has been eliminated.
ARTICLE 14 - PAYMENTS TO CONTRACTOR
14.01 Progress Payments
A. The Contractor shall prepare a schedule of values that will serve as the basis for progress payments. The schedule of values will be in a form of application for payment acceptable to RPR. The unit price breakdown submitted with the bid will be used for unit price work. Break lump sum items into units that will allow for measurement of Work in progress.
14.02 Applications for Payments:
A. Contractor shall submit an application for payment in a form acceptable to the RPR, no more frequently than monthly, to RPR. Applications for payment will be prepared and signed by 255 of 786
This document is a MODIFIED version of EJCDC® C-522, Copyright © 2016 by the National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers, or is based in part on excerpts from copyrighted EJCDC documents. Those portions of the text that originated in copyrighted EJCDC documents remain subject to the copyright.
Contractor. Contractor shall provide supporting documentation required by the Contract Documents. Payment will be paid for Work completed as of the date of the application for payment.
A. Beginning with the second application for payment, each application shall include an affidavit of Contractor stating that all previous progress payments received on account of the Work have been applied on account to discharge Contractor’s legitimate obligations associated with prior applications for payment.
1.01 Retainage
A. The Owner shall retain 5% of each progress payment until the Work is substantially complete.
1.02 Review of Applications
A. Within 10 days after receipt of each application for payment, the RPR will either indicate in writing a recommendation for payment and present the application for payment to Owner or return the application for payment to Contractor indicating in writing RPR’s reasons for refusing to recommend payment. The Contractor will make the necessary corrections and resubmit the application for payment.
B. RPR will recommend reductions in payment (set-offs) which, in the opinion of the RPR, are necessary to protect Owner from loss because the Work is defective and requires correction or replacement.
C. The Owner is entitled to impose set-offs against payment based on any claims that have been made against Owner on account of Contractor’s conduct in the performance of the Work, incurred costs, losses, or damages on account of Contractor’s conduct in the performance of the Work, or liquidated damages that have accrued as a result of Contractor’s failure to complete the Work.
1.03 Contractor’s Warranty of Title
A. Contractor warrants and guarantees that title to all Work, materials, and equipment furnished under the Contract will pass to Owner free and clear of (1) all liens and other title defects, and (2) all patent, licensing, copyright, or royalty obligations, no later than seven days after the time of payment by Owner.
1.04 Substantial Completion
A. The Contractor shall notify Owner and RPR in writing that the Work is substantially complete and request the RPR issue a certificate of substantial completion when Contractor considers the Work ready for its intended use. Contractor shall at the same time submit to Owner and RPR an initial draft of punch list items to be completed or corrected before final payment.
B. RPR will make an inspection of the Work with the Owner and Contractor to determine the status of completion. If RPR does not consider the Work substantially complete, RPR will notify Contractor and Owner in writing giving the reasons therefor.
C. If RPR considers the Work substantially complete or upon resolution of all reasons for nonissuance of a certificate identified in 14.06.B, RPR will deliver to Owner a certificate of substantial completion which shall fix the date of substantial completion and include a punch list of items to be completed or corrected before final payment. 256 of 786
This document is a MODIFIED version of EJCDC® C-522, Copyright © 2016 by the National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers, or is based in part on excerpts from copyrighted EJCDC documents. Those portions of the text that originated in copyrighted EJCDC documents remain subject to the copyright.
1.01 Final Inspection
A. Upon written notice from Contractor that the entire Work is complete, RPR will promptly make a final inspection with Owner and Contractor and will notify Contractor in writing of all particulars in which this inspection reveals that the Work, or agreed portion thereof, is incomplete or defective. Contractor shall immediately take such measures as are necessary to complete such Work or remedy such deficiencies.
1.02 Final Payment
A. Contractor may make application for final payment after Contractor has satisfactorily completed all Work defined in the Contract, including providing all maintenance and operating instructions, schedules, guarantees, bonds, certificates or other evidence of insurance, certificates of inspection, annotated record documents and other documents.
B. The final application for payment shall be accompanied (except as previously delivered) by:
1. All documentation called for in the Contract Documents;
2. Consent of the surety to final payment;
3. Satisfactory evidence that all title issues have been resolved such that title to all Work, materials, and equipment has passed to Owner free and clear of any liens or other title defects, or will so pass upon final payment;
4. A list of all disputes that Contractor believes are unsettled; and
5. Complete and legally effective releases or waivers (satisfactory to Owner) of all lien rights arising out of the Work, and of liens filed in connection with the Work.
C. The Work is complete (subject to surviving obligations) when it is ready for final payment as established by the RPR’s written recommendation of final payment.
1.03 Waiver of Claims
A. The making of final payment will not constitute a waiver by Owner of claims or rights against Contractor.
B. The acceptance of final payment by Contractor will constitute a waiver by Contractor of all claims and rights against Owner other than those pending matters that have been duly submitted.
ARTICLE 15 - SUSPENSION OF WORK AND TERMINATION
15.01 Owner May Suspend Work
A. At any time and without cause, Owner may suspend the Work or any portion thereof for a period of not more than 60 consecutive days by written notice to Contractor and RPR. Such notice will fix the date on which Work will be resumed. Contractor shall resume the Work on the date so fixed. Contractor shall be entitled to an adjustment in the Contract Price or an extension of the Contract Times, or both, directly attributable to any such suspension.
15.02 Owner May Terminate for Cause
A. Contractor’s failure to perform the Work in accordance with the Contract Documents or other failure to comply with a material term of the Contract Documents will constitute a default by Contractor and justify termination for cause. 257 of 786
This document is a MODIFIED version of EJCDC® C-522, Copyright © 2016 by the National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers, or is based in part on excerpts from copyrighted EJCDC documents. Those portions of the text that originated in copyrighted EJCDC documents remain subject to the copyright.
A. If Contractor defaults in its obligations, then after giving Contractor and any surety ten days written notice that Owner is considering a declaration that Contractor is in default and termination of the Contract, Owner may proceed to:
1. Declare Contractor to be in default, and give Contractor and any surety notice that the Contract is terminated; and
2. Enforce the rights available to Owner under any applicable performance bond.
B. Owner may not proceed with termination of the Contract under Paragraph 15.02.B if Contractor within seven days of receipt of notice of intent to terminate begins to correct its failure to perform and proceeds diligently to cure such failure.
C. Subject to the terms and operation of any applicable performance bond, if Owner has terminated the Contract for cause, Owner may exclude Contractor from the Site, take possession of the Work, incorporate in the Work all materials and equipment stored at the Site or for which Owner has paid Contractor but which are stored elsewhere, and complete the Work as Owner may deem expedient.
D. In the case of a termination for cause, if the cost to complete the Work, including related claims, costs, losses, and damages, exceeds the unpaid contract balance, Contractor shall pay the difference to Owner.
1.01 Owner May Terminate for Convenience
A. Upon seven days written notice to Contractor, Owner may, without cause and without prejudice to any other right or remedy of Owner, terminate the Contract. In such case, Contractor shall be paid for, without duplication of any items:
1. Completed and acceptable Work executed in accordance with the Contract Documents prior to the effective date of termination, including fair and reasonable sums for overhead and profit on such Work;
2. Expenses sustained prior to the effective date of termination in performing services and furnishing labor, materials, or equipment as required by the Contract Documents in connection with uncompleted Work, plus fair and reasonable sums for overhead and profit on such expenses; and
3. Other reasonable expenses directly attributable to termination, including costs incurred to prepare a termination for convenience cost proposal.
B. Contractor shall not be paid on account of loss of anticipated overhead, profits, or revenue, or other economic loss arising out of or resulting from such termination.
ARTICLE 16 - CONTRACTOR’S REPRESENTATIONS
16.01 Contractor Representations
A. Contractor makes the following representations when entering into this Contract:
1. Contractor has examined and carefully studied the Contract Documents, and any data and reference items identified in the Contract Documents.
2. Contractor has visited the Site, conducted a thorough visual examination of the Site and adjacent areas, and become familiar with and is satisfied as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work. 258 of 786
This document is a MODIFIED version of EJCDC® C-522, Copyright © 2016 by the National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers, or is based in part on excerpts from copyrighted EJCDC documents. Those portions of the text that originated in copyrighted EJCDC documents remain subject to the copyright.
1. Contractor is familiar with and is satisfied as to all Laws and Regulations that may affect cost, progress, and performance of the Work.
2. Contractor has considered the information known to Contractor itself; information commonly known to contractors doing business in the locality of the Site; information and observations obtained from visits to the Site; the Contract Documents; and the Siterelated reports and specifications identified in the Contract Documents, with respect to the effect of such information, observations, and documents on:
a. The cost, progress, and performance of the Work;
b. The means, methods, techniques, sequences, and procedures of construction to be employed by Contractor; and
c. Contractor’s safety precautions and programs.
3. Based on the information and observations referred to in the preceding paragraph, Contractor agrees that no further examinations, investigations, explorations, tests, studies, or data are necessary for the performance of the Work at the Contract Price, within the Contract Times, and in accordance with the other terms and conditions of the Contract.
4. Contractor is aware of the general nature of work to be performed by Owner and others at the Site that relates to the Work as indicated in the Contract Documents.
5. Contractor has given RPR written notice of all conflicts, errors, ambiguities, or discrepancies that Contractor has discovered in the Contract Documents, and the written resolution thereof by RPR is acceptable to Contractor.
6. The Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work.
7. Contractor’s entry into this Contract constitutes an incontrovertible representation by Contractor that, without exception, all prices in the Contract are premised upon performing and furnishing the Work required by the Contract Documents.
ARTICLE 17 - MISCELLANEOUS
17.01 Cumulative Remedies
A. The duties and obligations imposed by this Contract and the rights and remedies available hereunder to the parties hereto are in addition to, and are not to be construed in any way as a limitation of, any rights and remedies available to any or all of them which are otherwise imposed or available by Laws or Regulations, by special warranty or guarantee, or by other provisions of the Contract. The provisions of this paragraph will be as effective as if repeated specifically in the Contract Documents in connection with each particular duty, obligation, right, and remedy to which they apply.
17.02 Limitation of Damages
A. Neither Owner, RPR, nor any of their officers, directors, members, partners, employees, agents, consultants, or subcontractors, shall be liable to Contractor for any claims, costs, losses, or damages sustained by Contractor on or in connection with any other project or anticipated project.
259 of 786
This document is a MODIFIED version of EJCDC® C-522, Copyright © 2016 by the National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers, or is based in part on excerpts from copyrighted EJCDC documents. Those portions of the text that originated in copyrighted EJCDC documents remain subject to the copyright.
1.01 No Waiver
A. A party’s non-enforcement of any provision shall not constitute a waiver of that provision, nor shall it affect the enforceability of that provision or of the remainder of this Contract.
1.02 Survival of Obligations
A. All representations, indemnifications, warranties, and guarantees made in, required by, or given in accordance with the Contract, as well as all continuing obligations indicated in the Contract, will survive final payment, completion, and acceptance of the Work or termination or completion of the Contract or termination of the services of Contractor.
1.03 Contractor’s Certifications
A. Contractor certifies that it has not engaged in corrupt, fraudulent, collusive, or coercive practices in competing for or in executing the Contract.
1.04 Controlling Law and Venue
A. This Contract is to be governed by the law of the state of California and, in the event of litigation, venue will be in the County of San Mateo.
1.05 Notices
A. All notices shall be in writing, and delivered in person, or transmitted by certified mail, postage prepaid. Notices required to be given to Owner or Contractor shall be addressed as appears in the signature block at the end of this Contract.
1.06 No Partnership or Agency
A. Nothing in this Contract nor in the contract documents shall be deemed to constitute a partnership in law between Owner and Contractor, or any subcontractor, to constitute either party as an agent of the other for any purpose; or to entitle either party to commit or bind the other in any manner unless expressly agreed upon in the contract documents.
1.07 Severability
A. If any part or provision of the contract documents is determined by any court to be illegal, invalid, or unenforceable, in whole or in part, the contract documents shall continue to be valid as to its other provisions and the remainder of the affected provision, unless it can be concluded from the circumstances that, in the absence of the provisions found to be null and void, the parties would not have entered into the contract documents. The parties shall use all reasonable efforts to replace any and all provisions or parts found to be null and void with provisions that are valid under the applicable law and come closest to their original intention.
1.08 Waiver
A. None of the following shall operate as a waiver of any provision of the contract documents, or of any power herein reserved by the Owner, or any right to damages herein provided: 1) inspection by the Owner or its authorized agents or representatives; 2) any order or certificate for payment, or any payment for, or acceptance of the whole or any party of the work by the Owner; 3) an extension of time; or 4) any position taken by the Owner or its authorized agents or representatives.
260 of 786
This document is a MODIFIED version of EJCDC® C-522, Copyright © 2016 by the National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers, or is based in part on excerpts from copyrighted EJCDC documents. Those portions of the text that originated in copyrighted EJCDC documents remain subject to the copyright.
1.01 Warranty
A. Contractor warrants and guarantees that the materials and equipment provided shall be at least of the quality specified and new unless otherwise required or permitted by the contract documents and, if no quality is specified, then the materials and equipment shall be of commercial grade, suitable for heavy public use in facilities of similar size and complexity,, that the work performed hereunder will be free from defects, and that the work will conform to the requirements of the contract documents.
IN WITNESS WHEREOF, Owner and Contractor have signed this Contract.
This Contract will be effective on __________________ (which is the Effective Date of the Contract).
OWNER: City of San Mateo CONTRACTOR: OnPoint Construction By: Matt Fabry By: Emmanel Koutantos
Title: Public Works Director Title: President
By:
Title:
Address for giving notices:
330 West 20th Avenue 322 Lang Road
San Mateo, CA 94403 Burlingame, CA 94010
License No.: 949627
(where applicable)
APPROVED AS TO FORM
Linh P. Nguyen, Asst. City Attorney
261 of 786
This document is a MODIFIED version of EJCDC® C-522, Copyright © 2016 by the National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers, or is based in part on excerpts from copyrighted EJCDC documents. Those portions of the text that originated in copyrighted EJCDC documents remain subject to the copyright.
262 of 786
EXHIBIT A
SCOPE OF WORK
1. Exterior Façade:
• Extent of cement plaster and remedial work at first floor retail spaces includes area from the base of wall to 3-coat cement plaster assembly at floors 2-4. • Remove tile, brown and scratch coats, existing weather resistive barrier, flashing and accessories to the gypsum substrate. extend demolition to reveal 8-10 inches of weather resistive barrier to tie in over new weather resistive barrier. • Remove and store door for thresholds remediation storefront to remain in place if possible. • Repair or replace existing substrate.
• Clean rust off steel steel studs. apply rust inhibitors. • Prepare substrate to recieve new liquid membrane.
• Install trowel grade filler according manufacturer recommendations. • Install new liquid flashing at rough openings.
• Install new liquid membrane at fields.
• Install drainage matrix, lath, cement plaster accessories and stainless steel weeps. • Install scratch and brown coats.
• Install thinset and tiles at ground level.
• At levels above install EPS foam plant-ons and finish coat. • Paint and repellent to match.
• A green halo account is required by the city prior to permit request. direct to:
https://wastetracking.com/city/sanmateo/
• Contractor to clarify if scaffolding or sidewalk closures are required. provide pedestrian detour plan.
• Contractor to clarify if 3rd ave garage entries will be closed during the remedial work. garage entries from the street and from within the garage to be coned off if needed.
2. Traffic and Repellent Coating:
• At top parking floor remove and discard existing coating at pour strips. • Apply new traffic coating at pour strips.
• Apply new repellent coating at the rest of top parking concrete. • Apply new traffic coating at limited areas of level 2 parking floor and open areas of 3rd floor.
3. Miscellaneous Repairs:
• Repair all transitions, sealant joints adjacent to removed and or repaired assemblies. • Repair all interior finishes damaged by leaks.
• Re-coat all exterior signage.
263 of 786
• Repaint with elastomeric coating only at work areas.
1. Parking Floor Guardrail:
• Reapply elastomeric coating at guardrails.
• Remove and reapply sealant at guardrails.
• Remove existing flexi-rock at the exterior face of the guardrail and replace with cement plaster assembly.
2. Windows:
• Apply new metal joinery bridge-seal with color-match silicone sealant to blend with the existing aluminum frame.
• Apply new wet seal at glazing joints with black silicone sealant. • Storefront to remain in place if possible.
264 of 786
265 of 786
266 of 786
267 of 786
268 of 786
269 of 786
270 of 786
271 of 786
272 of 786
273 of 786
274 of 786
275 of 786
276 of 786
277 of 786
278 of 786
279 of 786
280 of 786
281 of 786
282 of 786
283 of 786
284 of 786
285 of 786
EXHIBIT B
INSURANCE REQUIREMENTS FOR CONSTRUCTION CONTRACTS
ARTICLE 1 - MINIMUM SCOPE AND LIMIT OF INSURANCE
1.01 Contractor shall procure and maintain for the duration of the contract, and for five (5) years thereafter, insurance against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the work hereunder by the Contractor, his agents, representatives, employees, or subcontractors.
1.02 Coverage shall be at least as broad as:
A. Commercial General Liability (CGL): Insurance Services Office (ISO) Form CG 00 01 covering CGL on an “occurrence” basis, including products and completed operations, property damage, bodily injury and personal & advertising injury with limits no less than $5,000,000 per occurrence. If a general aggregate limit applies, either the general aggregate limit shall apply separately to this project/location (ISO CG 25 03 or 25 04) or the general aggregate limit shall be twice the required occurrence limit.
B. Automobile Liability: Insurance Services Office Form CA 0001 covering Code 1 (any auto), with limits no less than $5,000,000 per accident for bodily injury and property damage.
C. Workers’ Compensation insurance as required by the State of California, with Statutory Limits, and Employers’ Liability insurance with a limit of no less than $1,000,000 per accident for bodily injury or disease.
D. Builder’s Risk (Course of Construction) insurance utilizing an “All Risk” (Special Perils) coverage form, with limits equal to the completed value of the project and no coinsurance penalty provisions.
E. Surety Bonds as described below.
F. Professional Liability (if Design/Build), with limits no less than $2,000,000 per occurrence or claim, and $2,000,000 policy aggregate.
G. Contractors’ Pollution Legal Liability and/or Asbestos Legal Liability and/or Errors and Omissions (if project involves environmental hazards) with limits no less than $1,000,000 per occurrence or claim, and $2,000,000 policy aggregate.
1.03 If the contractor maintains broader coverage and/or higher limits than the minimums shown above, the City requires and shall be entitled to the broader coverage and/or the higher limits maintained by the contractor. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to the City.
1.04 Self-Insured Retentions. Self-insured retentions must be declared to and approved by the City. At the option of the City, either: the contractor shall cause the insurer shall to reduce or eliminate such selfinsured retentions as respects the City, its officers, officials, employees, and volunteers; or the Contractor shall provide a financial guarantee satisfactory to the City guaranteeing payment of losses and related investigations, claim administration, and defense expenses. The policy language shall 286 of 786
provide, or be endorsed to provide, that the self-insured retention may be satisfied by either the named insured or City.
ARTICLE 2 - OTHER INSURANCE PROVISIONS
2.01 The insurance policies are to contain, or be endorsed to contain, the following provisions:
A. The City, its officers, officials, employees, and volunteers are to be covered as additional insureds on the CGL policy with respect to liability arising out of work or operations performed by or on behalf of the Contractor including materials, parts, or equipment furnished in connection with such work or operations and automobiles owned, leased, hired, or borrowed by or on behalf of the Contractor. General liability coverage can be provided in the form of an endorsement to the Contractor’s insurance (at least as broad as ISO Form CG 20 10, CG 11 85 or both CG 20 10, CG 20 26, CG 20 33, or CG 20 38; and CG 20 37 forms if later revisions used).
B. For any claims related to this project, the Contractor’s insurance coverage shall be primary insurance coverage at least as broad as ISO CG 20 01 04 13 as respects the City, its officers, officials, employees, and volunteers. Any insurance or self-insurance maintained by the City, its officers, officials, employees, or volunteers shall be excess of the Contractor’s insurance and shall not contribute with it.
C. Each insurance policy required by this clause shall provide that coverage shall not be canceled, except with notice to the City.
2.02 Builder’s Risk (Course of Construction) Insurance
A. Contractor may submit evidence of Builder’s Risk insurance in the form of Course of Construction coverage. Such coverage shall name the City as a loss payee as their interest may appear.
B. If the project does not involve new or major reconstruction, at the option of the City, an Installation Floater may be acceptable. For such projects, a Property Installation Floater shall be obtained that provides for the improvement, remodel, modification, alteration, conversion or adjustment to existing buildings, structures, processes, machinery and equipment. The Property Installation Floater shall provide property damage coverage for any building, structure, machinery or equipment damaged, impaired, broken, or destroyed during the performance of the Work, including during transit, installation, and testing at the City’s site.
2.03 Claims Made Policies
A. If any coverage required is written on a claims-made coverage form:
1. The retroactive date must be shown, and this date must be before the execution date of the contract or the beginning of contract work.
2. Insurance must be maintained, and evidence of insurance must be provided, for at least five (5) years after completion of contract work.
3. If coverage is cancelled or non-renewed, and not replaced with another claims-made policy form with a retroactive date prior to the contract effective, or start of work date, the Contractor must purchase extended reporting period coverage for a minimum of five (5) years after completion of contract work.
4. A copy of the claims reporting requirements must be submitted to the City for review.
5. If the services involve lead-based paint or asbestos identification/remediation, the Contractors Pollution Liability policy shall not contain lead-based paint or asbestos 287 of 786
exclusions. If the services involve mold identification/remediation, the Contractors Pollution Liability policy shall not contain a mold exclusion, and the definition of Pollution shall include microbial matter, including mold.
1.01 Acceptability of Insurers
A. Insurance is to be placed with insurers authorized to conduct business in the state with a current A.M. Best rating of no less than A: VII, unless otherwise acceptable to the City.
1.02 Waiver of Subrogation
A. Contractor hereby agrees to waive rights of subrogation which any insurer of Contractor may acquire from Contractor by virtue of the payment of any loss. Contractor agrees to obtain any endorsement that may be necessary to affect this waiver of subrogation. The Workers’ Compensation policy shall be endorsed with a waiver of subrogation in favor of the City for all work performed by the Contractor, its employees, agents and subcontractors.
1.03 Verification of Coverage
A. Contractor shall furnish the City with original Certificates of Insurance including all required amendatory endorsements (or copies of the applicable policy language effecting coverage required by this clause) and a copy of the Declarations and Endorsement Page of the CGL policy listing all policy endorsements to City before work begins. However, failure to obtain the required documents prior to the work beginning shall not waive the Contractor’s obligation to provide them. The City reserves the right to require complete, certified copies of all required insurance policies, including endorsements, required by these specifications, at any time.
1.04 Subcontractors
A. Contractor shall require and verify that all subcontractors maintain insurance meeting all requirements stated herein, and Contractor shall ensure that City is an additional insured on insurance required from subcontractors. For CGL coverage, subcontractors shall provide coverage with a form at least as broad as CG 20 38 04 13.
1.05 Surety Bonds.
A. Contractor shall provide the following Surety Bonds:
1. Performance Bond
2. Payment Bond
3. Maintenance Bond
B. The Payment Bond and the Performance Bond shall be in a sum equal to the contract price. If the Performance Bond provides for a one-year warranty a separate Maintenance Bond is not necessary. If the warranty period specified in the contract is for longer than one year a Maintenance Bond equal to 10% of the contract price is required. Bonds shall be duly executed by a responsible corporate surety, authorized to issue such bonds in the State of California and secured through an authorized agent with an office in California.
1.06 Special Risks or Circumstances.
A. City reserves the right to modify these requirements, including limits, based on the nature of the risk, prior experience, insurer, coverage, or other circumstances. 288 of 786
CITY OF SAN MATEO
CITY OF SAN MATEO
Agenda Report
City Hall
330 W. 20th Avenue
San Mateo CA 94403
www.cityofsanmateo.org
Agenda Number: 19 Section Name: CONSENT CALENDAR Account Number: 10-1311 File ID: 26-11519 TO: City Council
FROM: Alex Khojikian, City Manager
PREPARED BY: Human Resources Department
MEETING DATE: August 17, 2026
SUBJECT:
Civilian Investigator Classification Series Job Specification and Salary Schedule; Revisions to the Golf Services Manager and Parks and Landscape Manager Job Specifications – Approval RECOMMENDATION:
Adopt a Resolution to: 1) approve the establishment of the Civilian Investigator I-II-III merit classification series; 2) approve the job specification and salary ranges for the Civilian Investigator I, II, and III classification series; and 3) approve the revisions to the job specifications for the Golf Services Manager and Parks and Landscape Manager classifications.
BACKGROUND:
Police Department Civilian Investigator Classification Series:
The Police Department has historically relied on retired annuitants to conduct pre-employment background investigations and assist with follow-up investigations and cold cases. This model has become increasingly difficult to sustain due to a declining pool of qualified retirees, CalPERS post-retirement employment limitations, and increased competition for experienced investigators. As a result, delays in background investigations have the potential to affect the Department's ability to recruit and hire sworn personnel efficiently.
To address these challenges, the Police Department requests approval to establish the merit Civilian Investigator classification series, consisting of three classifications: Civilian Investigator I, an entry-level classification responsible for conducting pre-employment background investigations and providing administrative investigative support; Civilian Investigator II, a journey-level classification responsible for conducting independent investigations and case follow-up; and Civilian Investigator III, an advanced-level classification responsible for complex investigations, including cold cases, sensitive administrative investigations, and program oversight. The request also includes approval of the associated job specifications and annual salary ranges as follows:
• Civilian Investigator I: $105,587.99 - $125,915.64 annually • Civilian Investigator II: $116,146.78 - $138,507.20 annually • Civilian Investigator III: $127,761.46 - $152,357.92 annually The proposed classification series creates a dedicated career path for civilian investigative staff, reducing reliance on retired annuitants while providing continuity in investigative services. It also supports the timely completion of background investigations, strengthens recruitment efforts, and enables sworn personnel to focus on enforcement and high-priority investigative work.
The creation of Civilian Investigator classification series will serve as a replacement for the retired annuitant positions, and the Department currently intends to only hire per diem employees funded through the cost savings realized from the retired annuitant program.
289 of 786
CITY OF SAN MATEO
Parks and Recreation Department Revisions to Job Specifications:
The Parks and Recreation Department currently has one (1) Golf Services Manager position and one (1) Parks and Landscape Manager position. Following recent resignations, the Department conducted a comprehensive review of its operations to evaluate the roles and responsibilities of its merit staff and ensure that position classifications accurately reflect current operational needs.
As part of this review, the Department determined that the Golf Services Manager job specification had not been comprehensively updated since 2002 and no longer reflected the full scope of the position's responsibilities. The proposed revisions update the job specification to accurately capture the breadth of duties performed and the level of leadership, service, and operational standards required to effectively manage the City's golf facilities and programs.
For the Parks and Landscape Manager position, minor revisions are proposed. These edits are intended to improve consistency by aligning the job specification with the responsibilities and expectations of other management positions within the Parks and Recreation Department.
BUDGET IMPACT:
The creation of the new Civilian Investigator I-II-III classification does not include the addition of any new full-time merit positions and, therefore, has no impact on the City’s budget. The Police Department intends to utilize the classification solely for per diem employees using budget savings generated by vacant retired annuitant positions. No additional appropriation is required. There is no budget impact associated with the revisions to the job specifications of Golf Services Manager and Parks and Landscape Manager.
ENVIRONMENTAL DETERMINATION:
These classification updates are not subject to CEQA, because they will not cause a physical change in the environment. (CEQA Guidelines Section 15378(b)(4).)
STRATEGIC INITIATIVE:
This staff report supports the Organizational Health and Good Governance initiative.
NOTICE PROVIDED
All meeting noticing requirements were met.
ATTACHMENTS
Att 1 – Proposed Resolution
Exhibit A – Job Specifications
Exhibit B – Merit Salary Schedule
Att 2 – Job specifications with tracked changes
STAFF CONTACT
Aracelia G. Esparza, Human Resources Director
[email protected]
(650) 522-7260
290 of 786
CITY OF SAN MATEO
RESOLUTION NO. __ (2026)
APPROVING THE CLASSIFICATION UPDATES IN THE
POLICE DEPARTMENT AND DEPARTMENT OF PARKS AND RECREATION WHEREAS, pursuant to the San Mateo Municipal Code Section 2.57.030(d), approval of new classifications and related job specifications, salary schedules, compensation changes, elimination or reinstatement of positions, reallocation of positions, reclassifications, and revisions of job specifications must be approved by City Council Resolution; and
WHEREAS, the proposed updates, as detailed below, will establish the Civilian Investigator I-II-III merit classification series to support the Police Department's pre-employment background investigations and other investigative functions; and ensure that the job specifications for the Civilian Investigator I-II-III, Golf Services Manager, and Parks and Landscape Manager accurately reflect current operational responsibilities and organizational priorities.
WHEREAS, the proposed job specifications for the classifications of Civilian Investigator I-II-III, Golf Services Manager and Parks and Landscape Manager; and the salary ranges for the Civilian Investigator I-II-III classification series are attached hereto as Exhibits A and B, and incorporated by reference; and WHEREAS, the employee association representing the impacted classification has been informed of the proposed classification updates and has not brought forth any objections or concerns.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF SAN MATEO, CALIFORNIA, HEREBY RESOLVES that:
1. These classification updates are not subject to CEQA, because they will not cause a physical change in the environment. (CEQA Guidelines Section 15378(b)(4).)
2. The establishment of the Civilian Investigator I-II-III merit classification series; and
3. The job specifications for the classifications of Civilian Investigator I-II-III, Golf Services Manager and Parks and Landscape Manager; and
4. The salary ranges for the Civilian Investigator I-II-III classification series attached hereto as Exhibits A and B, are approved.
291 of 786
CIVILIAN INVESTIGATOR I - II - III
DEFINITIONS
Under close supervision for the Civilian Investigator I, under general supervision for the Civilian Investigator II and the Civilian Investigator III, perform investigative work in support of police operations, including background investigations, administrative investigations, follow-up investigations, case development, and coordination with sworn personnel and prosecutors; and perform other duties as required.
DISTINGUISHING CHARACTERISTICS
This is a three-level professional investigative series:
1. Civilian Investigator I – This is the entry level in the Civilian Investigator series that allows the employee to develop journey-level knowledge and skills. This classification is distinguished from the Civilian Investigator II by the performance of routine and structured investigative work in support of police operations, including background investigations, administrative investigations, and basic case support under close supervision. Employees are expected to demonstrate proficiency and may advance to the Civilian Investigator II classification.
2. Civilian Investigator II – This is the journey level in the Civilian Investigator series.
Employees within this classification are distinguished from Civilian Investigator I by the performance of standard investigative work, including independent background investigations, follow-up investigations, case development, and coordination with sworn personnel and prosecutors while exercising independent judgment. Positions in this class are flexibly staffed and are normally filled by advancement from the lower class of Civilian Investigator I, or, when filled from the outside, require prior investigative work experience.
3. Civilian Investigator III – This is the advanced journey level class in the Civilian Investigator series. Positions at this level are distinguished from other classes within the series by the level of responsibility assumed and the complexity of duties assigned. Individuals in the Civilian Investigator III classification perform advanced and lead-level investigative work, including complex, sensitive, or high-profile investigations (e.g., cold cases, internal investigations, officer-involved incidents support), and may serve as a program lead or a subject matter expert, and provide program oversight.
The Civilian Investigator III is a flexibly staffed classification, and positions are generally filled by advancement from the journey level class of Civilian Investigator II through a competitive process, or, when filled from the outside, require prior and advance investigative work experience.
Exhibit A
292 of 786
This classification is non-sworn and does not exercise peace officer powers.
SUPERVISION RECEIVED AND EXERCISED
• Investigator I: Receives close supervision from a sworn supervisor (Sergeant or above) or designated manager.
• Investigator II: Receives general supervision from a sworn supervisor (Sergeant or above) or designated manager.
• Investigator III: Receives general supervision from a sworn supervisor (Sergeant or above) or designated manager and may provide lead direction to lower-level investigators, analysts, or support staff.
EXAMPLES OF DUTIES Depending upon assignment, duties may include, but are not limited to, the following:
All Levels
• Conduct interviews of applicants, witnesses, victims, and involved parties • Collect, review, and analyze records (criminal history, financial, employment, digital evidence) • Prepare detailed investigative reports and summaries
• Maintain case files in compliance with legal and departmental standards • Testify in administrative or judicial proceedings as required • Coordinate with internal units and external agencies
• Ensure compliance with POST, local, state, and federal regulations Civilian Investigator I
• Conduct background investigations for police applicants and professional staff • Verify employment, education, and reference information • Conduct neighborhood canvassing and record checks
• Assist sworn personnel with follow-up investigations
• Compile case materials and organize investigative files • Perform data entry and case tracking
Civilian Investigator II
• Conduct complete, independent background investigations • Perform follow-up investigations on assigned criminal or administrative cases • Analyze evidence, timelines, and case facts
• Prepare search warrant and subpoena documentation (as applicable) • Coordinate with prosecutors and other agencies
• Assist with case preparation for filing and court proceedings • May be assigned to specialized units (e.g., personnel, property crimes, RTIC support) Civilian Investigator III
• Lead or conduct complex investigations, including cold cases and sensitive administrative investigations
• Review and approve investigative reports for completeness and quality • Provide guidance and training to lower-level investigators • Serve as liaison with prosecutors, command staff, and external partners • Manage investigative programs (e.g., backgrounds unit, cold case program) • Develop investigative procedures, policies, and best practices 293 of 786
• May oversee contract investigators or retired annuitants
QUALIFICATIONS
Knowledge of (All Levels, increasing with level)
• Investigative principles and practices
• Rules of evidence and legal procedures
• Interview and interrogation techniques
• Report writing and documentation standards
• Criminal justice system and court processes
• Applicable laws, regulations, and confidentiality requirements Ability to:
• Conduct thorough and objective investigations
• Analyze complex information and draw logical conclusions • Prepare clear, concise, and defensible reports
• Communicate effectively, both orally and in writing
• Establish and maintain working relationships
• Maintain confidentiality and handle sensitive information • Use investigative databases and technology systems
Experience and Education:
Any combination equivalent to experience and education that would provide the required knowledge and abilities would be qualifying. A typical way to obtain the knowledge and abilities would be:
Civilian Investigator I
• Equivalent to an Associate’s degree in criminal justice, public administration, or related field. • One (1) year of experience in investigative support, law enforcement support, or related field.
Civilian Investigator II
• Equivalent to a Bachelor’s degree in criminal justice or related field. • Three (3) years of progressively responsible investigative experience. • Desirable: Prior experience conducting background investigations or criminal investigations.
Civilian Investigator III
• Equivalent to a Bachelor’s degree in criminal justice or related field. • Five (5) years of advanced investigative experience, including complex or sensitive investigations.
• Experience leading investigations or related programs is required. • Desirable: Prior law enforcement, investigative, or prosecutorial experience.
License or Certificate:
Possession of a valid California driver’s license is required. 294 of 786
Necessary Special Qualifications/Requirements:
• Must meet all Department medical, physical, and psychological standards. • Must pass a comprehensive background investigation.
• Must maintain confidentiality of sensitive information. • May be required to work evenings, weekends, or on-call assignments ADA Special Requirements
Essential duties require the following physical abilities and work environment:
Ability to sit, stand, walk, kneel, crouch, squat, stoop, reach, crawl, twist, climb, and lift approximately 25 pounds. Exposure to cold, heat, extreme noise, outdoors, confining workspace, electrical hazards, chemicals, dust, toxic waste, mechanical hazards, and explosive materials.
ADOPTED CC: 08-17-2026
REVISED CC:
FORMER TITLES:
BARGAINING UNIT: MANAGEMENT UNIT
FLSA: NON-EXEMPT
DOT: YES
PRE APPT-MEDICAL: YES
SAFETY SENSITIVE: YES
REQUIRED HARASSMENT PREVENTION TRAINING: SUPERVISORY (III) FORM 700: NO
JOB CODES: CIVILIAN INVESTIGATOR I - 2004
CIVILIAN INVESTIGATOR II - 2005
CIVILIAN INVESTIGATOR III - 2006
ABOLISHED:
295 of 786
296 of 786
GOLF SERVICES MANAGER
DEFINITION
To plan, direct, organize, coordinate, and supervise municipal golf course operations and staff, including course maintenance, ground conditions, and facilities, while ensuring compliance with regulatory requirements. Administers and manage concessionaire contracts and activities, ensuring all contract provisions are consistently met; and other related duties as assigned.
SUPERVISION RECEIVED AND EXERCISED
Receives general direction from the director or designee.
Exercises direct supervision over professional, administrative, and maintenance staff.
EXAMPLE OF DUTIES - Depending upon assignment, duties may include, but are not limited to, the following:
Oversee all golf course daily functions, activities, operations, maintenance, and staff.
Develop standards of quality service for division staff and ensure the development and implementation of goals, objectives, and standards for the division.
Assist in developing and negotiating concessionaire and food and beverage contracts; administer contracts, audit and review all financial transactions; and ensure that contract provisions are being met for pro-shop, restaurant, banquet facility, and related activities.
Plan, supervise, lead, and review all maintenance activities for golf course , including but not limited to parking lots, equipment use and storage, irrigation systems, trees, ponds, wells, bunkers, tees, fairways greens and associated systems.
Prepare and authorize work orders; prioritize tasks; monitor and review work through completion and ensure compliance with standards and requirements.
Plan and implement approved short- and long-term renovations to course grounds and facilities in collaboration with the department project manager and other City departments; evaluate alternatives and recommend the most cost-effective and fiscally responsible approach Participate in the development of specifications for capital improvements and equipment purchase; administer contracts for course improvements and maintenance services. 297 of 786
Direct the selection, supervision and work evaluation of division staff and provide for their training and development.
Resolve public concerns and complaints timely regarding golf course facilities and functions; and confer with concessionaires regarding their services and ensure that standards are set for maximum public participation and enjoyment.
Prepare and administer the division's budget, including appropriate budgetary controls.
Ensure compliance of all division activities with city policies, and related federal, state, and local laws, codes and regulations.
Review golf course expenditures, revenues, fees and pro shop financial transactions ensuring they are appropriate and within current area market trends.
Enforce on-site City ordinances regarding the safe and proper use of golf course facilities.
Coordinate facilities and golf course maintenance activities with appropriate staff of other City departments and ensure completion.
Authorize and direct the maintenance and repair of golf course upkeep equipment while following all required procurement procedures.
Prepare and direct the maintenance of accurate records, files and reports related to the work of the division.
Administer, maintain, and support all golf operations technology, including but not limited to POS systems, reservation software, self-service kiosks, credit card processing equipment, and related hardware/software; ensure system integration, develop operating procedures, and provide training and technical support to City staff and contracted users.
Attend and participate in professional group meetings; stay abreast of new trends and innovations in the field of golf course management and operations.
Serve as a liaison for assigned functions with other City departments, divisions and outside agencies; provides staff support to commissions and committees.
QUALIFICATIONS
Knowledge of:
Principles and practices of municipal golf course maintenance and administration.
Methods, materials, equipment, tools, and techniques used in the maintenance and repair of golf course grounds and facilities.
Principles and practices of contract negotiation and administration, particularly in a public agency setting.
298 of 786
Principles and practices of employee supervision, including selection, work planning, organization, performance review and evaluation, and employee training and discipline.
Principles and practices of administration and budget management.
Turf and plant diseases and pests, including appropriate control and eradication measures.
Accurate record keeping principles and practices.
Safety principles, practices and equipment related to the work.
Techniques for effectively interacting and communicating with the public.
Ability to:
Oversee and evaluate work activities to ensure efficient and effective operations.
Train and develop staff..
Plan, organize, coordinate, and direct the improvement, maintenance and repair of golf turf and related facilities.
Analyze, review, and audit business operations and concessionaire agreements to ensure compliance, accountability, and operational effectiveness Read and interpret plans and specifications.
Prepare clear and concise reports, correspondence, and other written materials.
Develop and implement effective organizational frameworks, including goals, policies, and accountability measures.
Establish and maintain effective working relationships with those contacted in the course of the work.
Experience and Education:
Any combination equivalent to experience and training that would like provide the required knowledge and abilities would be qualifying. A typical way to obtain the knowledge and abilities would be:
Experience:
Four years of administrative and/or supervisory experience in golf course operations and maintenance. Experience in turf management and course renovation is desirable.
Training:
Equivalent to graduation from a four-year college or university with major course work in horticulture, agronomy, or a field related to the work. Additional experience in golf course 299 of 786
management, turf maintenance or a related field may be substituted for the education on a yearfor-year basis.
Licenses and Certifications:
Possession of, or ability to obtain, an appropriate, valid driver's license.
Possession of any professional certificates in golf maintenance, agronomy or golf management is highly desirable.
ADA Special Requirement:
Essential duties require the following physical abilities and work environment:
Ability to sit, stand, walk, kneel, stoop, drive, and lift 50 pounds, exposure to outdoors, chemicals, pesticides, dust, and mechanical hazards.
ADOPTED CC: 4-12-81
REVISED CC: 12-16-85, 7-18-94, 5-20-02, 8-17-26
FORMER TITLES: GOLF SUPERINTENDENT
BARGAINING UNIT: MANAGEMENT
FLSA: EXEMPT
PERFORMANCE APPRAISAL: MANAGEMENT
DOT: NO
PRE APPT-MEDICAL: YES
SAFETY SENSITIVE: NO
REQUIRED HARASSMENT PREVENTION TRAINING: SUPERVISORY
FORM 700: YES JOB
CODE: 2160 ABOLISHED:
300 of 786
301 of 786
PARKS AND LANDSCAPE MANAGER
DEFINITION
Under direction, plans, organizes and directs all activities of the Park for the beautification, improvement and maintenance of the City's parks, landscaping, urban forest, playgrounds, public facilities, open space areas, and medians. Performs related work as required.
SUPERVISION RECEIVED AND EXERCISED
Receives general direction from the director or designee.
Exercises direct supervision over supervisory, professional, maintenance, and administrative support staff.
EXAMPLES OF DUTIES - Duties may include, but are not limited to, the following:
Plan and organize the work to staff responsible for the development, improvement and maintenance of parks, landscaped medians, urban forests, playground areas, public facility landscaping and open space areas.
Inspect and review work in progress and upon completion and resolve work problems.
Receive and review bids from contractors; award contracts within policy guidelines; and monitor performance.
Develop program goals, content and standards of quality; and ensure implementation of goals and objectives.
Review and advise on new park and park redevelopment plans, including irrigation.
Coordinate park maintenance and improvement activity with other City departments and with outside agencies.
Fully utilize the computerized work systems in accordance with work flow processes.
Respond to questions, complaints and emergency calls and take appropriate course of action.
Prepare and administer the Park Division budget.
302 of 786
Prepare and supervise the maintenance of a variety of records and reports.
Direct the selection, supervision and work evaluation of staff and provide for their training and development.
Research plant materials, diseases and pests; assess growth habits and soil requirements.
Respond to community concerns as required.
Ensure compliance of activities to pertinent codes, regulations and guidelines; especially SB2126- Agricultural Pest Control Advisor requirements.
Perform related duties as assigned.
MINIMUM QUALIFICATIONS
Knowledge of:
Principles and practices of municipal park management, horticulture, landscaping, and urban forestry.
Current methods, materials, equipment, tools and safety practices used in the maintenance of parks and urban forests.
Irrigation materials, methods, and design concepts.
Tree planting and maintenance.
Plant and tree diseases and pests, including approved control and eradication methods and chemicals.
Principles and practices of administration, budget and personnel management.
Safety practices related to the work.
Principles and practices of contract preparation and administration.
Personal computer applications.
Ability to:
Acquire a thorough knowledge of Department and Division policies and regulations; and of applicable City policies, programs and regulations.
Acquire a thorough knowledge of applicable local, State and Federal laws and regulations. 303 of 786
Effectively plan, organize, coordinate, and direct the development, improvement, maintenance, and repair of parks, urban forests, and other open space areas.
Review organizational and administrative problems; recommend and implement effective courses of action.
Ability to use computers and handheld electronic devices in the course of work.
Communicate clearly and concisely, orally and in writing.
Develop and implement goals, objectives, policies, work standards and management controls.
Maintain proper records and prepare accurate reports.
Establish and maintain effective working relationships with those contacted in the course of work.
Read and interpret construction plans and specifications.
Experience and Training Guidelines
Any combination equivalent to experience and training that would likely provide the required knowledge and abilities are qualifying. A typical way to obtain the knowledge and abilities would be:
Experience:
Four years of increasingly responsible administrative and supervisory experience in park management and urban forestry.
Training:
Equivalent to a Bachelor's degree from an accredited college or university with major coursework in park management, landscape architecture, arboriculture or horticulture.
License or Certificates:
Possession of a valid California Driver's License.
Possession of a certificate as an Arborist by the International Society of Arborists is desirable.
ADA Special Requirement:
Essential duties require the following physical abilities and work environment:
Ability to work in a standard office and field environment, including exposure to inclement weather; and ability to work extended hours and respond to emergency situations. 304 of 786
ADOPTED CC: 4-12-81
REVISED CC: 12-16-85, 6-17-91, 5-20-02, 4-04-07, 3-06-17, 8-21-17 FORMER TITLES:
BARGAINING UNIT: MANAGEMENT UNIT
FLSA: EXEMPT
PERFORMANCE APPRAISAL: MANAGEMENT
DOT: NO
PRE APPT MEDICAL: NO
SAFETY SENSITIVE: NO
REQUIRED HARASSMENT PREVENTION TRAINING: SUPERVISORY
FORM 700: YES JOB
CODES: 2250
ABOLISHED:
305 of 786
306 of 786
Exhibit B
City of San Mateo – Merit Salary Schedule for Adoption by Council on August 17, 2026.
Steps Hourly Biweekly Monthly Annual
Step 1 50.76 4061.08 8,799.00 105,587.99
Step 2 53.05 4243.82 9,194.95 110,339.45
Step 3 55.43 4434.80 9,608.73 115,304.72
Step 4 57.93 4634.36 10,041.12 120,493.44
Step 5 60.54 4842.91 10,492.97 125,915.64
Steps Hourly Biweekly Monthly Annual
Step 1 55.84 4467.18 9,678.90 116,146.78
Step 2 58.35 4668.21 10,114.45 121,373.39
Step 3 60.98 4878.28 10,569.60 126,835.19
Step 4 63.72 5097.80 11,045.23 132,542.78
Step 5 66.59 5327.20 11,542.27 138,507.20
Steps Hourly Biweekly Monthly Annual
Step 1 61.42 4913.90 10,646.79 127,761.46
Step 2 64.19 5135.03 11,125.89 133,510.73
Step 3 67.08 5366.10 11,626.56 139,518.71
Step 4 70.09 5607.58 12,149.75 145,797.05
Step 5 73.25 5859.92 12,696.49 152,357.92
Civilian Investigator I - 2004
Civilian Investigator II - 2005
Civilian Investigator III - 2006
307 of 786
GOLF SERVICES MANAGER
DEFINITION
To plan, direct, organize, coordinate, and supervise municipal golf course operations through subordinate supervisionand staff, including course maintenance, ground conditionss, and facilities, whileand activitiesensuring compliance with regulatory requirements;. to aAdministers and manage concessionaire contracts and activities, and ensureensuring all that contract provisions are metconsistently met; and other. ; to supervise grounds and facilities maintenance activities through subordinate supervision; and to do related related work as requiredduties as assigned.
SUPERVISION RECEIVED AND EXERCISED
General Receives general direction is provided by from the director or designeeParks and Recreation Director.
Direct supervision is provided to office support staff and maintenance supervisory staff; indirect supervision is provided to maintenance staff. Exercises direct supervision over professional, administrative, , and maintenance staff.
EXAMPLE OF DUTIES - Depending upon assignment, duties may include, but are not limited to, the following:
Oversee all golf course daily functions, activities, operations, and maintenance, and staff.
Develop standards of quality service for division staff and ensure the development and implements implementation of goals, and objectives, and standards for the division.
Assist in developing and negotiating concessionaire and food and beverage contracts; administer contracts, audit and review revenues and expenditures all financial tranastionstransactions; and ensure that contract provisions are being met for pro-shop, restaurant, banquet facility, and related activities.
Plan, supervise, through subordinate supervision, lead, and review all maintenance activities for golf course maintenance, including but not limited to parking lots, equipment use and storage, 308 of 786
irrigation systems, trees, ponds, wells, bunkers, tees, fairways . and greens and associated systems.
Prepare and authorize work orders, prioritize work and review work in progress and upon through completion, ensure that work meets accepted standards and requirements; resolve contract problems. Prepare and authorize work orders; prioritize tasks; monitor and review work through completion and ensure compliance with standards and requirements.
Plan and implement, in partnership with department project manager or other city departments, upon approval, short- and long-term renovation of course grounds and facilities; and analyze alternatives and determine whether such renovation should be done by City or contractor staff.
Best approach that is fiscally prudent. Plan and implement approved short- and long-term renovations to course grounds and facilities in collaboration with the department project manager and other City departments; evaluate alternatives and recommend the most cost-effective and fiscally responsible approach
Participate in the development of specifications for capital improvements and equipment purchase; administer contracts for course improvements and maintenance services.
Direct the selection, supervision and work evaluation of division staff and provide for their training and development.
Resolve public concerns and complaints tinelytimely regarding golf course facilities and functions; and confer with concessionaires regarding their services and ensure that standards are set for maximum public participation and enjoyment.
Prepare and administer the division's budget, including appropriate budgetary controls.
Ensure compliance of all division activities with applicable codes, regulations and guidelines with city policies, and related federal, state, and local laws, codes and regulations.
Review golf course charges andexpenditures, revenues, fees and pro shop financial transactionsfees and ensuringe that they are appropriate in the currentand within current area market trends.
Enforce on-site City ordinances regarding the safe and proper use of golf course facilities.
Coordinate facilities and golf course maintenance activities with appropriate staff of other City departments and ensure completion.
Authorize and direct the maintenance and repair of golf course upkeep equipment while following all required procurement procedures.
Coordinate and oversee the design and renovation of golf course facilities and grounds. 309 of 786
Authorize and direct the maintenance and repair of golf course upkeep equipment.
Prepare and direct the maintenance of accurate records, files and reports related to the work of the unitdivision.
Administer and monitor all technology reincluding hardware and software selected by the City to manage golf activities. Implement procedures and training for City staff and contracted endusers- Administer, maintain, and support all golf operations technology, including but not limited to POS systems, reservation software, self-service kiosks, credit card processing equipment, and related hardware/software; ensure system integration, develop operating procedures, and provide training and technical support to City staff and contracted users.
Attends and participates in professional group meetings; stays abreast of new trends and innovations in the field of golf course management and operations.
Serve as a liaison for assigned functions with other City departments, divisions and outside agencies; provides staff support to commissions and committees.
QUALIFICATIONS
Knowledge of:
Principles and practices of municipal golf course maintenance and administration.
Methods, materials, equipment, tools, and techniques used in the maintenance and repair of golf course grounds and facilities.
Principles and practices of contract negotiation and administration, particularly in a public agency setting.
Principles and practices of employee supervision, including selection, work planning, organization, performance review and evaluation, and employee training and discipline.
Principles and practices of administration and budget management.
Turf and plant diseases and pests, including appropriate control and eradication measures.
Accurate Rrecord keeping principles and practices.
Safety principles, practices and equipment related to the work.
Techniques for dealing with the public, in person and over the telephoneeffectively interacting and communicating with the public.
310 of 786
Ability to:
Oversee and evaluate work activities to ensure efficient and effective operations.Plan, organize, supervise, review and evaluate the work of others.
Train and develop staff.others in policies and procedures related to the work.
Plan, organize, coordinate, and direct the improvement, maintenance and repair of golf turf and related facilities.
Analyze, review, and audit business operations and concessionaire agreements to ensure compliance, accountability, and operational effectivenessReview and audit business activities and concessionaire contracts.
Read and interpret plans and specifications.
Prepare clear and concise reports, correspondence, and other written materials.
Develop and implement effective organizational frameworks, including goals, policies, and accountability measures. Develop and implement goals, objectives, policies, work standards and management controls.
Establish and maintain effective working relationships with those contacted in the course of the work.
Experience and Education:
Any combination equivalent to experience and training that would like provide the required knowledge and abilities would be qualifying. A typical way to obtain the knowledge and abilities would be:
Experience:
Four years of administrative and/or supervisory experience in golf course operations and maintenance. Experience in turf management and course renovation is desirable.
Training:
Equivalent to graduation from a four-year college or university with major course work in horticulture, agronomy, or a field related to the work. Additional experience in golf course management, turf maintenance or a related field may be substituted for the education on a year-for-year basis.
Licenses and Certifications:
Possession of, or ability to obtain, an appropriate, valid driver's license. 311 of 786
Must possess a valid California Driver's license.
Possession of a Pest Control Advisor's certificate issued by the State of California within one year of appointment is desirable. Possession of any professional certificates in golf maintenance, agronomy or golf management is highly desirable.
ADA Special Requirement:
Essential duties require the following physical abilities and work environment:
Ability to sit, stand, walk, kneel, stoop, drive, and lift 50 pounds, exposure to outdoors, chemicals, pesticides, dust, and mechanical hazards.
ADOPTED CC: 4-12-81
REVISED CC: 12-16-85, 7-18-94, 5-20-02, 7-20-268-17-26
FORMER TITLES: GOLF SUPERINTENDENT
BARGAINING UNIT: MANAGEMENT
FLSA: EXEMPT
PERFORMANCE APPRAISAL: MANAGEMENT
DOT: NO
PRE APPT-MEDICAL: YES
SAFETY SENSITIVE: NO
REQUIRED HARASSMENT PREVENTION TRAINING: SUPERVISORY
FORM 700: YES JOB CODE: 2160
ABOLISHED:
312 of 786
PARKS AND LANDSCAPE MANAGER
DEFINITION
Under direction, plans, organizes and directs all activities of the Park for the beautification, improvement and maintenance of the City's parks, landscaping, urban forest, playgrounds, public facilities, open space areas, and medians. Performs related work as required.
SUPERVISION RECEIVED AND EXERCISED
Receives general direction from the Director of Parks and Recreationdirector or designee.
Exercises direct supervision over supervisory, professional, maintenance, and administrative support staff.
EXAMPLES OF DUTIES - Duties may include, but are not limited to, the following:
Plan and organize the work to staff responsible for the development, improvement and maintenance of parks, landscaped medians, urban forests, playground areas, public facility landscaping and open space areas.
Inspect and review work in progress and upon completion and resolve work problems.
Receive and review bids from contractors; award contracts within policy guidelines; and monitor performance.
Develop program goals, content and standards of quality; and ensure implementation of goals and objectives.
Review and advise on new park and park redevelopment plans, including irrigation.
Coordinate park maintenance and improvement activity with other City departments and with outside agencies.
Fully utilize the computerized work systems in accordance with work flow processes.
Respond to questions, complaints and emergency calls and take appropriate course of action.
Prepare and administer the Park Division budget.
313 of 786
Prepare and supervise the maintenance of a variety of records and reports.
Direct the selection, supervision and work evaluation of staff and provide for their training and development.
Research plant materials, diseases and pests; assess growth habits and soil requirements.
Respond to community concerns as required.
Ensure compliance of activities to pertinent codes, regulations and guidelines; especially SB2126-Agricultural Pest Control Advisor requirements.
Perform related duties as assigned.
MINIMUM QUALIFICATIONS
Knowledge of:
Principles and practices of municipal park management, horticulture, landscaping, and urban forestry.
Current methods, materials, equipment, tools and safety practices used in the maintenance of parks and urban forests.
Irrigation materials, methods, and design concepts.
Tree planting and maintenance.
Plant and tree diseases and pests, including approved control and eradication methods and chemicals.
Principles and practices of administration, budget and personnel management.
Safety practices related to the work.
Principles and practices of contract preparation and administration.
Personal computer applications.
Ability to:
Acquire a thorough knowledge of Department and Division policies and regulations; and of applicable City policies, programs and regulations.
314 of 786
Acquire a thorough knowledge of applicable local, State and Federal laws and regulations.
Effectively plan, organize, coordinate, and direct the development, improvement, maintenance, and repair of parks, urban forests, and other open space areas.
Review organizational and administrative problems; recommend and implement effective courses of action.
Ability to use computers and handheld electronic devices in the course of work.
Communicate clearly and concisely, orally and in writing.
Develop and implement goals, objectives, policies, work standards and management controls.
Maintain proper records and prepare accurate reports.
Establish and maintain effective working relationships with those contacted in the course of work.
Read and interpret construction plans and specifications.
Experience and Training Guidelines
Any combination equivalent to experience and training that would likely provide the required knowledge and abilities are qualifying. A typical way to obtain the knowledge and abilities would be:
Experience:
Four years of increasingly responsible administrative and supervisory experience in park management and urban forestry.
Training:
Equivalent to a Bachelor's degree from an accredited college or university with major coursework in park management, landscape architecture, arboriculture or horticulture.
License or Certificates:
Possession of a valid California Driver's License.
Possession of a certificate as an Arborist by the International Society of Arborists is desirable.
ADA Special Requirement:
315 of 786
Essential duties require the following physical abilities and work environment:
Ability to work in a standard office and field environment, including exposure to inclement weather; and ability to work extended hours and respond to emergency situations.
ADOPTED CC: 4-12-81
REVISED CC: 12-16-85, 6-17-91, 5-20-02, 4-04-07, 3-06-17, 8-21-17 FORMER TITLES:
BARGAINING UNIT: MANAGEMENT UNIT
FLSA: EXEMPT
PERFORMANCE APPRAISAL: MANAGEMENT
DOT: NO
PRE APPT MEDICAL: NO
SAFETY SENSITIVE: NO
REQUIRED HARASSMENT PREVENTION TRAINING: SUPERVISORY
FORM 700: YES JOB CODES: 2250
ABOLISHED:
316 of 786
CITY OF SAN MATEO
CITY OF SAN MATEO
Agenda Report
City Hall
330 W. 20th Avenue
San Mateo CA 94403
www.cityofsanmateo.org
Agenda Number: 20 Section Name: CONSENT CALENDAR Account Number: 10-1511 File ID: 26-11572 TO: City Council
FROM: Alex Khojikian, City Manager
PREPARED BY: City Clerk's Office
MEETING DATE: August 17, 2026
SUBJECT:
League of California Cities Annual Conference — Voting Delegate Designation RECOMMENDATION:
Designate Deputy Mayor Nicole Fernandez as the voting delegate for the 2026 League of California Cities Annual Conference.
BACKGROUND:
The City is a member of the League of California Cities (League) and as part of its annual conference, a business meeting will be conducted between September 23-25, 2026, for the League membership to consider and act on resolutions that establish League policy. The City has one vote in the proceedings, and the City Council must designate a voting delegate to represent the City and may also appoint up to two alternate voting delegates, one of whom may vote in the event that the designated voting delegate is unable to serve in that capacity. The City's voting delegate is due to the League no later than September 1, 2026.
BUDGET IMPACT:
The City Council budget has sufficient funds to cover the costs associated with Deputy Mayor Fernandez' participation as a voting delegate at the League of California Annual Conference.
ENVIRONMENTAL DETERMINATION:
This travel authorization request is not a project subject to CEQA, because it is an organizational or administrative activity that will not result in direct or indirect physical changes in the environment. (CEQA Guidelines Section 15378(b)(5).)
STRATEGIC PLAN ALIGNMENT
This staff report supports the Organizational Health and Good Governance initiative.
NOTICE PROVIDED
All meeting noticing requirements were met.
ATTACHMENTS
None
STAFF CONTACT
Martin McTaggart, City Clerk
[email protected]
(650) 522-7042
317 of 786
CITY OF SAN MATEO
CITY OF SAN MATEO
Agenda Report
City Hall
330 W. 20th Avenue
San Mateo CA 94403
www.cityofsanmateo.org
Agenda Number: 21 Section Name: PUBLIC HEARING Account Number: 26-3111 File ID: 26-11356 TO: City Council
FROM: Alex Khojikian, City Manager
PREPARED BY: Community Development Department
MEETING DATE: August 17, 2026
SUBJECT:
616 S. B Street – New Eight-Story Commercial/Residential Mixed-Use Building (PA-2025-039) — Approval RECOMMENDATION:
Adopt a Resolution to approve the Site Plan and Architectural Review (SPAR), Site Development Planning Application (SDPA), and Tentative Parcel Map to merge five lots, demolish two existing commercial buildings and construct a new eight-story mixed-use building with 94 residential units and 7,286 square feet of ground floor commercial space at 616 S. B Street, and find that the project is Categorically Exempt from the California Environmental Quality Act pursuant to Section 15332 (Infill Development Projects) based on the findings for approval and subject to the conditions of approval.
BACKGROUND:
On June 20, 2025, Nazareth Vista, LLC, (“Applicant”) submitted a Planning Application (PA-2025-039) to demolish two existing commercial buildings (former Kelly-Moore Paints and TAP Plastics, approximately 11,300 square feet total) and construct a new eight-story mixed-use building at 616 S. B Street, referred to as “Nazareth Vista” (“Project”). The proposed mixed-use building includes 94 residential units, with 10 below market rate (BMR) units at the very low-income affordability level, 7,286 square feet of ground floor commercial space, and an internal parking structure located on the ground floor, second and third story levels (114 total spaces). The proposed unit mix includes studio, one-bedroom, and two-bedroom units. The formal application follows the submittal of a Preliminary Application (PA- 025-023) under the Housing Crisis Act (Senate Bill 330). A Neighborhood Informational Meeting was held by the applicant on April 23, 2025.
The Applicant had previously obtained a Planning Application approval on December 12, 2023 for a five-story mixed-use building with 48 rental units with five BMR units at the very low-income level, and approximately 9,200 square feet of ground-floor retail (PA-2022-037). This prior project approval expired on December 12, 2025.
On June 9, 2026, the Planning Commission held a hearing to consider the Project. Following public comments and deliberation, the Planning Commission voted unanimously (5-0) to recommend that the City Council approve the Project.
The Planning Commission recommendation included a condition of approval, with the applicant expressing consent, that incorporated the recommendations from the City’s retail consultant, with the exception of the recommendation to require additional retail ceiling height on the ground floor.
The Project requires approval by the City Council in accordance with SMMC Section 7.06.050(d), as the Project exceeds the height limit specified in the General Plan. The Project site has a General Plan Land Use Designation of Mixed-Use Medium II, which allows buildings up to six stories. The proposed Project has a height of eight stories and is utilizing a State Density Bonus waiver to exceed this General Plan standard, which is discussed in further detail below. 318 of 786
CITY OF SAN MATEO
Project Site
The Project site is located at 616 S. B Street, on the southwest side of the street, between 6th Avenue and 7th Avenue. It consists of two parcels with a combined area of 27,921 square feet (0.64 acres). The 2040 General Plan Land Use Designation for the Project site is Mixed-Use Medium II, which allows residential densities of up to 99 dwelling units per acre, and is zoned C1-3/R5 (Neighborhood Commercial/Residential Overlay – Mixed Use). The Project site is also located within the Downtown Area Plan. The existing site contains two one-story commercial buildings with retail uses – formerly TAP Plastics and Kelly-Moore Paints.
Adjacent uses include multi-family residential, commercial, and a mixed-use building consisting of office, residential, and ground floor commercial uses. To the south of the Project site across 7th Avenue is “Nazareth Terrace” – a four-story mixeduse building with ground floor commercial and three upper stories of residential. Bordering to the west of the Project site is a two-story residential building, and a five-story residential condominium building (Stradbally Court). “The Stratford,” a 10- story senior living condominium building is also located on the same block west of the Project site. Across 6th Avenue to the north of the site is “Gramercy on the Park,” a six-story residential condominium building, and across S. B Street to the east is a two-story mixed-use building (commercial and residential) and a one-story office building. The Downtown San Mateo Caltrain station is located approximately 0.4 miles north of the Project site. A location map showing the Project and its vicinity is included as Attachment 2.
Project Description
The Applicant proposes an eight-story mixed-use building containing ground floor commercial space and residential units above. The ground floor includes 7,286 square feet of commercial space, oriented along S. B Street. There are four main pedestrian entries to the commercial storefronts, with three storefront entries provided along the S. B Street frontage, and one storefront entry at the corner of S. B Street and 6th Avenue. Also included on the ground floor is the main pedestrian entrance to the residential lobby, located on the 7th Avenue frontage, as well as a fitness center for use by residents only with access both from the residential lobby and at the corner of 7th Avenue and S. B Street.
A total of 114 vehicle parking stalls and 98 long-term bicycle parking spaces are also provided within the proposed Project, accessed via two vehicular driveways – one along 6th Avenue and another along 7th Avenue. The 6th Avenue vehicular driveway provides access to 21 parking stalls located on the ground floor to serve the retail uses as well as visitor parking.
The 7th Avenue vehicular driveway provides access to the second and third floor parking garage levels with 93 parking stalls reserved for residents. Long-term bicycle storage for the retail uses is provided within the ground floor parking level, and long-term bicycle storage for the residential uses is located on the second and third floor parking levels. Bicycle racks located along the 7th Avenue, S. B Street, and 6th Avenue frontages satisfy the required 10 short-term bicycle spaces for the Project.
Floors four through eight include the 94 residential rental units, 10 of which are below market rate (BMR) units affordable to very-low income households. In addition to the fitness center on the ground floor, residential amenities include a shared open-space amenity deck and a community room, both located on the fourth floor.
The Project design and context are discussed further below. Project plans including the proposed site plan, floor plans, elevations, and architectural renderings are included as Attachment 3.
Mixed-Use Retail Component
To maximize the commercial viability and leasing potential of the ground-floor retail space, the Project was routed to the City’s retail consultant, Metrovation Retail Resources, for review. The consultant provided several recommendations. The first recommendation was to incorporate doors at the back of each retail tenant space to provide access via the interior parking area for trash disposal and deliveries, as well as for customers to access the retail from the retail parking area.
Additional recommendations included adding infrastructure to accommodate future food-based businesses such as restaurants or cafes. Such infrastructure recommendations include providing appropriate Type I and Type II venting hood systems and grease interceptors, ensuring appropriate utility connections for water, gas, and electric are provided with individual metering for each retail tenant, including restrooms for each retail tenant space, and avoiding drop ceilings that would reduce the interior floor to ceiling height of the retail spaces. The applicant was receptive to including each of these recommendations, noting that they would provide additional information to show the utilities, ventilation, and other 319 of 786
CITY OF SAN MATEO
infrastructure for the retail tenant spaces during the building permit review phase of the Project. A recommendation to increase the ceiling height to at least 14 feet was also included, but the applicant was not open to incorporating this recommendation as it would not work with their overall building construction design.
APPLICABLE CODE AND POLICY REVIEW:
General Plan and Zoning Code
The 2040 General Plan Land Use Designation for the Project site is Mixed-Use Medium II, which allows medium-density mixed-use buildings to provide a mix of commercial, office, and/or residential uses within the same site or building. It is intended to allow a mix of uses near other mixed-use, commercial, or residential areas, and within Downtown. The MixedUse Medium II designation allows for residential densities of up to 99 dwelling units per acre. For this 0.64-acre site, the base density allows up to 64 units.1 To achieve the proposed 94 units (147 units per acre), the applicant is requesting a fifty percent density bonus under state law, which is further discussed below. A list of applicable General Plan policies, and discussion of how the Project is consistent with these policies is included in the Resolution (Attachment 1).
The Project site is zoned C1-3/R5 (Neighborhood Commercial/Residential Overlay – Mixed Use); therefore, the project is subject to the development standards outlined in San Mateo Municipal Code (“SMMC”) Chapter 27.30, Neighborhood Commercial. In addition, the R5 overlay allows residential uses by right and provides development standards in SMMC Chapter 27.29 pertaining to density, floor area ratio (FAR), setbacks, and open space for residential projects located in commercial or office zoning districts. A project data table listing the applicable Zoning Code standards and the Project’s conformance to them is included in Attachment 4. As noted in the table, where there is an inconsistency between the Zoning Code and General Plan 2040, the General Plan shall control (per Government Code Section 65860(c)(2)(B) and SMMC Section
27.02.220). Additionally, the applicant is seeking one concession and several development waivers to certain development standards in accordance with State Density Bonus Law (Government Code Section 65915) and local code per SMMC Chapter
27.15. The concession and waivers are discussed in greater detail below.
Parking Standards
The Project is located within the City’s Central Parking Improvement District (CPID), which was established to set specific regulations for projects located within the Downtown Area Plan. However, the site is also located within one-half mile of the Downtown Caltrain Station, which is a major transit stop. Therefore, pursuant to Government Code Section 65863.2 (AB 2097), the Project is not subject to any minimum parking requirements or parking in-lieu fees. Despite the fact that no parking is required, the Project includes 114 spaces, with 21 spaces for the commercial tenants and 93 spaces for residents.
Downtown Area Plan
The Project site is located within the Downtown Area Plan, which established goals and policies to implement the overall vision of the downtown. The Downtown Area Plan, adopted in 2009, provides design guidance and a vision for Downtown San Mateo that is pedestrian-friendly and serves as a focal point of the community, including a blend of historical buildings and new development, with retail, entertainment, and housing opportunities. The Downtown design guidelines have been adapted to enforceable objective standards reflected in the City’s Multi-family and Residential Mixed-Use Objective Design Standards (ODS), discussed further below.
Citywide Pedestrian Master Plan
The Citywide Pedestrian Master Plan includes recommendations to improve the pedestrian realm throughout the City.
Appendix A of the Plan provides guidance on sidewalk design and widths based on the adjacent land uses and street parking configurations. For the Project frontages, the Plan recommends sidewalk widths ranging from 16 to 26 feet.
The Project proposes sidewalks measuring 16 feet in width along 6th Avenue and 12 feet in width along both 7th Avenue and S. B Street. While the sidewalk along 6th Avenue is consistent with the Plan’s recommendations, the sidewalks along S.
B Street and 7th Avenue do not achieve the recommended widths because setbacks (which provide the space for widened sidewalks) are not provided. No setback is required along the S. B Street frontage, and the Project seeks a setback waiver along 7th Avenue pursuant to State Density Bonus Law. Despite these constraints, the Project incorporates enhanced 1 The calculation of 63.36 units is rounded up to 64 units in accordance with State housing law requiring fractional units be rounded up to the nearest whole number. 320 of 786
CITY OF SAN MATEO
pedestrian space at key intersections. Along 6th Avenue, the 20-foot setback creates an expanded sidewalk area of up to 30 feet in width extending approximately 20 feet from the corner with S. B Street. At the intersection of 7th Avenue and S. B Street, a curb bulb-out increases the sidewalk width to approximately 20 feet at the Project corner.
Overall, the project is consistent with the Pedestrian Master Plan by providing compliant sidewalk widths along 6th Avenue and portions of S. B Street and 7th Avenue, while also meeting applicable Zoning Code setback requirements through waivers under State Density Bonus Law, as discussed further below.
Bicycle Master Plan
The Bicycle Master Plan provides policies and recommendations to implement citywide infrastructure improvements to support bicycle use. The Bicycle Master Plan also lays out a proposed bicycle network of various bicycle lanes, paths and routes. Specific to the subject project site, the Bicycle Master Plan calls for a buffered bicycle lane (Class II) along the Project’s S. B Street frontage, which consists of pavement markings that provide additional horizontal separation between vehicles and bicyclists.
The City is not requiring the Applicant to physically construct or design the bike facilities along its S. B Street frontage. Rather, staff evaluated the Project to ensure the site plan would not preclude installation of the buffered bike lanes in the future.
Lastly, as required by the City’s Zoning Code, the Project provides 97 long-term bicycle parking spaces for residential uses within dedicated rooms on the second and third level of the garage and two long-term bicycle parking spaces for commercial uses in a bike locker located on the ground floor of the parking garage. A total of ten short-term bicycle parking spaces are also provided through on-site bike racks.
Transportation Analysis
A Transportation Impact Analysis (TIA) prepared by Hexagon Transportation Consultants, Inc. (“Hexagon”) was submitted by the Applicant and reviewed by the City (Attachment 6). Based on the City’s adopted TIA Guidelines (2020), the Project was determined to be exempt from a detailed Vehicle Miles Travelled (VMT) analysis under the California Environmental Quality Act (CEQA), specifically because the Project meets the following screening criteria: it is within one-half mile of a high-quality transit stop (Downtown San Mateo Caltrain Station), has a floor area ratio greater than 0.75, does not result in the reduction of affordable residential units, does not provide more parking than would otherwise be required by the City’s local standards, and is consistent with the Metropolitan Transportation Commission’s (MTC) Sustainable Communities Strategy.
The General Plan 2040 Circulation Element Policy C 6.3 requires a site-specific TIA be prepared in accordance with the City’s adopted TIA Guidelines for projects that may result in an adverse condition or effect on the roadway system. This is a local policy requirement independent from the CEQA VMT analysis requirements. In accordance with this requirement, the TIA provided by Hexagon includes a Local Transportation Analysis (LTA), which included a Level of Service (LOS) analysis at six study intersections around the Project site. The report found that the LOS at the study intersections, both in the opening year of the Project and cumulatively, would operate at an acceptable level of service.
Overall, the LTA estimates that the project would generate a total of 901 net-new average daily vehicle trips, 56 net-new vehicle trips in the AM peak hour, and 55 net-new vehicle trips in the PM peak hour. These trip generation numbers were included in the LOS analysis and were not found to result in any adverse impacts to the LOS at the study intersections.
However, the City/County Association of Governments (C/CAG) of San Mateo County requires projects that generate more than 100 average daily trips to implement trip reduction measures. Based on C/CAG’s guidelines, this Project is required to reach a minimum of 25 percent trip reduction through Transportation Demand Management (TDM) measures. C/CAG provides a TDM checklist that the Project has completed to identify how the Project will achieve the required trip reduction through a selection of TDM measures. Some of the measures, such as registration and participation in Commute.org certification for TDM are required, while others are optional. The total reduction for this Project from the selected TMD measures is 32.5 percent, which exceeds the required 25 percent reduction. The Project conditions of approval include a requirement that the Project comply with the TDM Program through the life of the Project. 321 of 786
CITY OF SAN MATEO
APPLICABLE HOUSING LAWS:
State Density Bonus Law
The Project utilizes the provisions of State Density Bonus Law in accordance with Government Code Section 65915 and as locally adopted in SMMC Chapter 27.15 Density Bonus. To comply with Density Bonus regulations, the City must allow for increased residential density, reduced parking standards, and “concessions” and “waivers” from development standards for residential projects that provide a certain percentage of the units as affordable units.
The Project site’s General Plan Land Use Designation of Mixed-Use Medium II, with a density of 99 units per acre, allows for a base of 64 units. The Project includes 15 percent (10 units) at the very low-income level. Pursuant Government Code Section 66915(d)(2)(C), a project can receive a 50 percent density bonus when 15 percent of the units are proposed at very low-income levels; therefore, the Project is able to increase its density by up to 50 percent, which allows for a total of 94 units (147 units per acre).
With 15 percent of the units provided at the very-low-income level, State Density Bonus Law also allows the applicant to request up to three concessions and unlimited waivers from development standards. A concession is a reduction or modification of a development standard that results in identifiable or actual cost reductions to provide for affordable housing costs, helping to make the Project financially feasible. A waiver is a modification of a standard that would otherwise physically preclude the construction of the Project at the allowed density. The Project application includes one concession request to depart from the Spanish Colonial Revival architectural style required by Section 7.1.2 of the Objective Design Standards, as well as several waivers for aspects of the Project that do not meet various City development standards. The applicant has included a summary of the Project waivers in their density bonus request letter (Attachment 5). A complete list of the Project’s requested waivers is included in Attachment 1, Exhibit B.
Other Applicable State Laws
In addition to State Density Bonus Law, there are several other State Laws that regulate housing development projects. For this Project, these include, but are not necessarily limited to the following:
• The Housing Crisis Act (Senate Bill 330) - Under Senate Bill 330 (SB 330), the Project vests the ordinances, policies, and standards adopted and in effect when a preliminary application was submitted to the City. This Project submitted a Preliminary Application under SB 330 on 33, and is therefore vested to the ordinances, policies, and standards in place as of this date.
• The Housing Accountability Act (HAA) - The HAA limits a local agency’s ability to deny, reduce the density of, or render housing development projects infeasible if objective standards are met. As proposed, this Project meets all applicable objective standards in the General Plan, Zoning Code, and other local policy documents that were in effect at the time the preliminary application was submitted under SB 330.
Inclusionary Housing Requirements
The City’s Below Market Rate (Inclusionary) Program requires rental projects of 11 or more units to provide a minimum of 15 percent of the proposed units to be designated low-income units. The applicant proposes to designate 10 units (15 percent of the base density) as affordable at the very low-income level, which meets the City’s Inclusionary Program requirements (very-low-income units satisfy low-income requirements). These affordable units are required to be distributed throughout the development, have access to all on-site amenities, generally be of comparable size to similar market rate units, and have an exterior design and appearance compatible with similar market rate units.
PLANNING APPLICATIONS:
Site Plan and Architectural Review (SPAR)
The Project requires a Site Plan and Architectural Review (SPAR) approval for construction of a new building in accordance with SMMC Section 27.08.030. Staff have reviewed the Project for compliance with the Objective Design Standards and 3 The initial SB330 Preliminary Application was submitted on March 28, 2025. However, between the first and second resubmittals, over 90 days elapsed. Pursuant to Government Code Section 65941.1(d)(2), if the applicant does not provide a resubmittal within 90 days of receiving the City’s comments on an incomplete application, the preliminary application expires. The applicant provided a new SB330 Preliminary Application with their resubmittal made on December 22, 2025, thereby vesting the Project to local ordinances, policies, and standards adopted in effect from this date. 322 of 786
CITY OF SAN MATEO
worked with the applicant to revise portions of the design for greater compatibility with these standards and the surrounding neighborhood context. Detailed findings for approval of the SPAR are included in the Resolution (Attachment 1).
Design Review – Objective Design Standards
The Project was reviewed for consistency with the City’s Multi-family and Residential Mixed-Use Objective Design Standards (ODS). The Project has a contemporary urban mixed-use style with clean horizontal and vertical massing, a flat roof form, and a modern material palette. Design features include recessed balconies, large vertical windows, and a decorative banding feature above the ground floor commercial spaces. The podium construction design provides a visual break between the ground floor commercial component and screened internal parking structure from the residential units above, and the building corner features expanded glazing at the podium level helping to distinguish this feature in the design.
The building is eight stories in height, which is considered a high-rise building per the City’s ODS. The Project includes a parking structure integrated into the building on the first three levels. The parking area is fully enclosed, with two garage entries proposed – one at the 6th Avenue frontage providing access for the residential parking on the second and third floors, and one at the 7th Avenue frontage providing access to the retail and visitor parking on the ground floor. The frontage includes public open space with landscape planters and a seating bench incorporated into the design, as well as ground-level entrances to commercial storefronts proposed along S. B Street, contributing to a pedestrian-friendly environment at the street level.
The Project requests a concession to depart from the Spanish Colonial Revival architectural style required by Section 7.1.2 of the Objective Design Standards, citing that full adherence to these architectural standards would impose additional costs on the development due to the cost of adding the architectural features such as ornamentation, decorative tile, or additional window recesses. In addition to this concession request, the project has identified several waivers to specific development standards outlined in the Zoning Ordinance and the ODS, specifically related to the building height, setback requirements, floor area ratio requirements, loading zone configuration, vertical wall plane breaks, open space shading requirements, and standards derived from the Downtown Plan Area related to the height of architectural features in relation to adjacent buildings.
Site Development Planning Application (SDPA)
Municipal Code Section 23.40 requires a Site Development Planning Application (SDPA) approval for removal of major vegetation in conjunction with the redevelopment of a parcel. The Project proposes removal of a total of six trees, two of which qualify as protected trees due to their trunk diameters being 15 inches or greater, measured at 54 inches above natural grade. The equivalent landscape unit (LU) value of the removed trees would be replaced as conditioned via planting of new trees, payment of an in-lieu fee, or a combination of both in accordance with SMMC 27.71. Staff’s evaluation of the proposed Project is that the SDPA findings for approval can be made in that the Project proposes to plant four new trees along the 6th Avenue landscape area and 12 new street trees along the 6th Avenue, 7th Avenue, and B Street frontages. An in-lieu fee will be paid to the City’s Tree Planting Fund for the remaining balance of the existing LU value. Additional details on the SDPA findings for approval are included in the Resolution (Attachment 1).
Tentative Parcel Map
The Project requires approval of a Tentative Parcel Map, pursuant to San Mateo Municipal Code Section 26.48, to merge five lots into one parcel. The Tentative Parcel Map is consistent with SMMC Title 26, Subdivisions, and all other applicable requirements. Additional details regarding the Tentative Parcel Map findings for approval are included in the Resolution (Attachment 1). The full list of conditions of approval is provided in Exhibit A of Attachment 1.
PUBLIC NOTICE AND COMMENTS:
All meeting noticing requirements were met in accordance with SMMC Section 27.08.050, with notice provided in the San Mateo Daily Journal, City placards posted on the Project site, and notice sent to the following parties more than ten days in advance of this City Council meeting:
• Property owners & tenants of property located within a 1,000-foot radius of the Project site. • The City’s Planning “Notify Me” email list; and
• The interested parties, which includes interested individuals who contacted the City and requested to be added to 323 of 786
CITY OF SAN MATEO
the Project notification list.
The applicant held a formal Neighborhood Informational Meeting on April 23, 2025, which was attended by approximately 17 participants. The discussion and comments at the Neighborhood Informational Meeting included concerns with the proposed height of the building (at eight stories as compared to the previous approval for a five-story structure), concerns related to parking and traffic impacts of the proposed project, with some residents commenting that parking in the neighborhood is already constrained and expressing concern for increased traffic, specifically related to pedestrian safety.
Residents from the nearby residential buildings raised concerns regarding loss of bay views and screening of rooftop mechanical equipment, as well as shadows from the new building. Several attendees commented in support of the Project, citing the quality of architecture and design, increase in housing supply particularly in Downtown San Mateo, and confidence in the Applicant, Nazareth Enterprises, based on prior projects by the same developer nearby.
Ahead of the June 9, 2026 Planning Commission public hearing, staff received six emails, including public comments from neighbors, as well as a petition including signatures from approximately 100 residents of the nearby Gramercy building. The comments included concerns focused on increased building height and density, traffic, parking, noise, pedestrian safety, loss of sunlight and views, and potential neighborhood quality of life impacts. These comments are included as Attachment 8.
During the Planning Commission meeting on June 9, 2026, 13 speakers provided verbal public comments. Comments provided focused primarily on pedestrian safety, traffic, loading and moving operations, and requests for additional crosswalk and traffic calming improvements. Other speakers expressed support for the project's addition of housing near transit, contribution to downtown revitalization, and potential to support local businesses.
Following the Planning Commission public hearing, additional correspondence with public comment/questions was received by staff for clarification regarding the scoping of the TIA document. Specifically, these questions centered around why specific items listed in Section 3.9 of the TIA Guidelines were not included in the TIA for this project, including the following:
Neighborhood Traffic Assessment for 6th and 7th Avenues, pedestrian facilities analysis within a quarter mile of the project site, bicycle facilities analysis within a quarter mile of the project site, parking assessment comparing proposed supply against ITE peak demand rates, and a fair share calculation for B Street and 5th Avenue. Each of these items was considered when reviewing the TIA scope, and were determined to not be applicable or not required as a part of the TIA review, either because they were addressed through other sections of the analysis, were outside the scope of the City's TIA Guidelines or legal authority, or were not triggered because the project would not create an adverse traffic condition or require transportation improvements. This email correspondence, including staff’s response, is included in Attachment 8.
Any additional public comments received after the publication of this report will be forwarded to the City Council for review consideration and posted to this item as “Post Packet Public Comments” on the City’s Agendas & Minutes Public Meeting Portal.
BUDGET IMPACT:
As a new housing project filed under SB 330, the Project would be subject to several impact and in-lieu fees in effect at the time of the application filing date, including the ones listed below, which are assessed and collected prior to the issuance of building permits or occupancy5.
• Commercial Linkage Fee of approximately $47,720, to offset the impact of development projects on the need for affordable housing.
• Child Care Development Fee of approximately $319,950, to offset the impact on the need for future childcare space as a result of new development
• Park Impact Fee of approximately $2,394,550 ($25,474 per residential unit), to offset the increased demands on park and recreation facilities serving new developments. • Wastewater Capacity Charge of approximately $601,170, to pay for the Project’s proportionate share of the 5 The fees provided are estimates only. Actual fees may be higher or lower based on any permissible fee increase at the time of fee collection or credits the Project may be eligible for.
324 of 786
CITY OF SAN MATEO
average cost of sewer facilities (exiting and planned) to meet demands of the City’s sewer service area. • School Impact Fees charged at $4.94 per sq. ft. of residential area, to offset the increased demands on school facilities caused by new development. This is collected by the San Mateo Union High School District for all schools in San Mateo.
• Public Art Fee in the amount of 1.19% of the total building valuation (excluding land acquisition and off-site improvement cost) in-lieu of providing on-site public art. • Transportation Improvement Fee of approximately $569,570 to fund citywide traffic improvements.
ENVIRONMENTAL DETERMINATION:
In accordance with the California Environmental Quality Act (CEQA), the project meets the criteria to be Categorically Exempt from further environmental review pursuant to Section 15332 (Class 32 - Infill Development Projects). Qualification for the exemption requires that the project is consistent with all applicable General Plan policies and Zoning Code regulations; the site is located within an urban setting on a site less than five acres in size; it has no value as habitat for endangered, rare, or threatened species; and would continue to be served by all utilities and public services, and does not have unusual circumstances that lead to significant effects with the inclusion of standard conditions of approval. Approval of the Project would not result in any significant impacts relating to traffic, noise, air quality, or water quality. The proposed project meets the above criteria and qualifies for the exemption. A more detailed explanation of these findings is included in the Categorical Exemption Memorandum prepared by the City’s environmental review consultant, David J. Powers (Attachment 7).
STRATEGIC PLAN ALIGNMENT:
This Staff Report supports the Housing initiative.
ATTACHMENTS
Att 1 – Proposed Resolution
Exhibit A – Conditions of Approval
Exhibit B – Density Bonus Waivers
Att 2 – Location Map
Att 3 – Project Plans
Att 4 – Project Date Table
Att 5 – Density Bonus Request Letter
Att 6 – Transportation Impact Analysis (Hexagon, Inc.)
Att 7 – CEQA Categorical Exemption Memorandum
Att 8 – Public Comments
STAFF CONTACT
Elizabeth Gagliardi, Associate Planner
[email protected]
(650) 522-7206
325 of 786
CITY OF SAN MATEO
RESOLUTION NO. ____ (2026)
A RESOLUTION OF THE CITY COUNCIL APPROVING A SITE PLAN AND ARCHITECTURAL REVIEW (SPAR), SITE
DEVELOPMENT PLANNING APPLICATION (SDPA), AND TENTATIVE PARCEL MAP TO MERGE TWO LOTS, FOR CONSTRUCTION OF A NEW MIXED-USE BUILDING WITH COMMERCIAL USES AND 94 RESIDENTIAL UNITS, AND
DETERMINE THAT THE PROJECT IS EXEMPT FROM FURTHER ENVIRONMENTAL REVIEW UNDER CALIFORNIA
ENVIRONMENTAL QUALITY ACT
WHEREAS, Nazareth Vista, LLC, (“Applicant”) submitted a Planning Application No. PA‐2025‐039 for a Site Plan and Architectural Review, Site Development Planning Application, and Tentative Parcel Map for lot merger and construction of a new mixed-use building consisting of 7,286 square feet of commercial uses and 94 residential units and associated site improvements located at 616 S. B Street (collectively referred to as “Project”) in the City of San Mateo (“City”); and
WHEREAS, the proposed Project is designated as Mixed-Use Medium II in the General Plan Land Use Plan, Zoned Neighborhood Commercial/Residential Overlay – Mixed Use (C1-3/R5) in the Zoning Ordinance, and located within Downtown Area Plan planning area; and
WHEREAS, in fulfillment of the City’s Below Market Rate requirement pursuant to San Mateo Municipal Code (SMMC) Section 27.16.050, the Project is providing ten (10) rental units affordable to very-low income households, of which five are studio units, four are one-bedroom units, and one is a two-bedroom unit; and WHEREAS, approval of the Applicant’s Project is considered a “Project” for the purposes of the California Environmental Quality Act, Public Resources Code Section 21000, et. seq (“CEQA”); and WHEREAS, the City finds that the Project is categorically exempt from further environmental review under CEQA Guidelines Section 15332 In-Fill Development Projects based on the findings in the section below; and WHEREAS, the Project is consistent with the applicable policies of the General Plan 2040 and other applicable policies; and
WHEREAS, the Project is providing 15 percent of the units affordable to Very-Low Income households, which allows the applicant to request up to three concessions and unlimited waivers from developmentstandards pursuant to State Density Bonus Law under Government Code Section 65915(d). The Applicant requests one concession and several waivers. A list of Project concessions and waivers are included as Exhibit B; and WHEREAS, the Planning Commission held a public hearing for the Project on June 9, 2026, duly noticed, at which time the Commission received and considered oral and written evidence, all public comments were considered, and by a vote of 5-0 recommended that the City Council approve the Project; and WHEREAS, SMMC Section 27.06.050 authorizes the City Council to take final action on Site Plan and Architectural Review for buildings that exceed the height limit in the General Plan.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF SAN MATEO, CALIFORNIA, HEREBY FINDS AND RESOLVES that:
1. On the basis of the whole record before it, there is no substantial evidence that the Project will have a significant effect on the environment. The Project is categorically exempt from the provisions of CEQA under CEQA Guidelines Section 15332 as follows:
326 of 786
a. The Project is consistent with the General Plan land use designation and all applicable General Plan policies as well as the applicable zoning designation and regulations. b. The Project site is located within an urban setting on a site of less than five acres (0.64 acres).
The Project site has no value for endangered, rare, or threatened species. The Project will not have a substantial adverse effect on any riparian habitat or sensitive natural community, or on any species identified as a candidate, sensitive, or special status species, identified in local or regional plans, policies, or regulations, or by the California Department of Fish and Game or U.S. Fish and Wildlife Service.
The Project will not have a substantial adverse effect on federally protected wetlands through direct removal, filling, hydrological interruption, or other means, and will not substantially interfere with the movement of any native resident or migratory fish or wildlife species or with established native resident or migratory wildlife corridors, or impede the use of native wildlife nursery sites.
The Project will not conflict with any local policies or ordinances protecting biological resources, such as but not limited to, a tree preservation policy or ordinance; nor will it conflict with the provisions of an adopted Habitat Conservation Plan, Natural Community Conservation Plan, or other approved local, regional, or state habitat conservation plan.
The Project will not impact any threatened or endangered biological resources, and buildings have existed on the site. The Project will include the removal of six trees, and planting of three new trees and twelve new street trees on the Project site. The Applicant will pay a fee in lieu of the difference between the number of trees removed and the number of new trees to be planted.
b. Approval of the Project will not result in any significant effects relating to traffic. Hexagon Transportation Consultants, Inc., the applicant hired consultant, prepared a Transportation Impact Assessment (TIA). The TIA concluded that the Project will not cause any study intersection to operate at an unacceptable level of service and will not cause adverse Level of Service (LOS) effects. The TIA also determined that the Project does not require a detailed Vehicle Miles Traveled (VMT) analysis due to the proximity of the Project site to an existing, major transit stop (Downtown Caltrain station) and another transit system (SamTrans), and proximity to downtown.
Additionally, the applicant has completed the City/County Association of Governments (C/CAG) checklist to implement a combination of required and optional Transportation Demand Management (TDM) measuresthat will result in an expected 32.5 percent reduction in trips, which exceeds the required 25 percent reduction for projects that generate over 100 net new trips.
The Project will not conflict with an applicable congestion management program and will not result in a change in air traffic patterns. The Project will not substantially increase hazards due to a design feature or incompatible uses, result in inadequate emergency access or inadequate parking capacity, conflict with other adopted policies, plans, or programs regarding public transit, bicycle, or pedestrian facilities, or otherwise decrease the performance or safety of such facilities. All Project safety elements will be designed to meet all applicable California Building, Fire, Safety and any other requirements. c. Approval of the Project will not result in any significant effects relating to noise or vibration as conditioned. The Project will not expose persons to or generate noise levels, groundborne vibration, or groundborne noise levels in excess of standards established in the local general plan or noise ordinance, or applicable standards, and will not create a substantial permanent increase in ambient noise levels in the Project vicinity above existing levels. 327 of 786
The Project may expect a substantial temporary or periodic increase in groundborne vibration and ambient noise levels in the Project vicinity above levels existing without the Project, but only during the period of construction. Noise generated during construction would differ depending on the construction phase and the type and amount of equipment used at the construction site. The Applicant will be required to abide by the conditions of approval, construction work hours, and comply with the City’s Noise Ordinance. d. Approval of the Project will not result in any significant effects relating to air quality, as conditioned. The Project will not conflict with or obstruct implementation of the applicable air quality plan, violate any air quality standard or contribute substantially to an existing or projected air quality violation, result in a cumulatively consideration net increase of any criteria pollutant, expose sensitive receptors to substantial pollutant concentrations, or create objectionable odors affecting a substantial number of people.
The Project will have limited impact to air quality and would not subject customers or employees of nearby businesses, visitors, residents, and/or neighbors to objectionable odors.
The Project would not result in additional exposure of sensitive receptors to substantial pollutant concentrations in the long term but has the potential to generate dust and other pollutants, during demolition, grading, and construction. However, the impact of dust generated by demolition, grading and/or construction activities is temporary in nature and limited to site preparation and future construction of the new residential development.
Conditions of approval to minimize dust and vehicle emissions during grading and construction activities are included.
e. Approval of the Project will not result in any significant effects relating to water quality. The Project will not violate any water quality standards or waste discharge requirements or substantially deplete groundwater supplies or interfere substantially with groundwater recharge as the site is not serviced by nearby wells, nor will it alter the existing drainage pattern of the site or area, create or contribute runoff water which would exceed the capacity of existing or planned stormwater drainage systems.
The Project will not otherwise substantially degrade water quality or place housing or structures within a 100-year flood hazard area since the Project is not located within a 100- year flood plain. The Project will not expose people or structures to a significant risk of loss, injury or death involving flooding, including flooding as a result of the failure of a levee or dam or create inundation by seiche, tsunami, or mudflow since the Project is not located in an area of potential inundation as identified in the City’s General Plan. f. The site is adequately served by all required utilities. The Project would not exceed wastewater treatment requirements of the applicable Regional Water Quality Control Board, require or result in the construction of new water or wastewater treatment facilities or expansion of existing facilities, require or result in the construction of new storm water drainage facilities or expansion of existing facilities. The Public Works department has determined that there is adequate infrastructure capacity serving the site to adequately handle the increases.
c. The site is adequately served by all required public services. The Project would not result in substantial adverse physical impacts associated with the provision of new or physically altered governmental facilities, need for new or physically altered governmental facilities, in order to maintain acceptable service ratios, response times or other performance objectives for Fire protection, Police protection, Schools, Parks, or other public facilities. The Project will be subject to various impact fees, and is located in an urbanized area served by municipal services, therefore it is not anticipated to significantly impact public services or require the 328 of 786
additional construction of public facilities as the proposed multi-family residential use can be accommodated with existing levels of service.
BE IT FURTHER RESOLVED, BY THE CITY COUNCIL OF THE CITY OF SAN MATEO, CALIFORNIA AS FOLLOWS:
General Plan Conformance
1. The Project conforms to applicable policies of the General Plan 2040 Land Use Element. a. Policy LU 1.1 Equitable Development. Prioritize development projects that meet social and economic needs of the economically vulnerable populations to address and reverse the underlying socioeconomic factors in the community that contribute to residential and social segregation in the city. Provide a range of housing types, sizes, and affordability levels in all San Mateo neighborhoods.
b. Policy LU 3.1 Housing Diversity. Promote safe, attractive, and walkable residential neighborhoods with diverse types and sizes of homes for individuals, families, and households of all income levels.
The Project is consistent with the above Land Use Element policies by providing a diverse set of units ranging from studio to two-bedrooms, including 84 market-rate units and 10 affordable units for very-low income households and within one-half mile of the Downtown San Mateo Caltrain Station. The Project replaces two one-story commercial buildings with a high-quality mixed-use commercial and residential development that incorporates on-site amenities and open spaces. It also includes a range of bedroom configurations that support different household sizes, including two-bedroom units.
2. The Project conforms to applicable policies of the General Plan 2040 Circulation Element. a. Policy C 3.2 Pedestrian Enhancements with New Development. Require new development projects to provide sidewalks and pedestrian ramps and to repair or replace damaged sidewalks, in addition to right-of-way improvements identified in adopted City master plans.
Encourage new developments to include pedestrian-oriented design to facilitate pedestrian path of travel.
b. Policy C 4.5 Bicycle Improvements. Require new developments to construct or contribute to improvements that enhance the cyclist experience, including bicycle lanes and bicycle parking.
The Project is consistent with the above Circulation Element policies by providing sidewalks and pedestrian path of travel in accordance with the City’s Pedestrian Master Plan. The Project incorporates street-level landscaping as well as a public open space with bench seating near the entry of the building. In addition, the Project provides both short-term and long-term bicycle parking.
3. The Project conforms to applicable policies of Housing Element 2023-02031. a. Policy H1.3 Increase Affordable Housing Production. Adopting an updated Density Bonus/Community Benefit Program that provides additional incentives and/or streamlining option for housing projects that provide additional affordable units or the most needed unit types (including those with special needs) beyond minimum State requirements. 329 of 786
The Project increases affordable housing production by providing 10 affordable units for very-low income households. In addition, the Project includes 94 total units, expanding housing options for a range of household sizes and income levels.
4. The Project conforms to applicable policies of the General Plan 2040 Community Design and Historic Resources Element.
a. Policy CD 3.2 Replacement Planting. Require appropriate replacement planting or payment of an in-lieu fee when protected trees on public or private property are removed. b. Policy CD 6.7 Public Open Space Design. Seek opportunities to establish public open spaces in new developments and new public buildings, and promote innovative and creative designs to create exceptional, unique, and functional spaces. Require signage that clearly delineates these spaces as publicly accessible.
c. Policy CD 7.3 Multifamily Design. Encourage architectural design of new multifamily developments that enhances a neighborhood’s visual and architectural character by providing context sensitive building and pedestrian-scale elements, high-quality materials and construction, open space, and resident amenities.
The Project provides in-lieu fees for protected trees proposed for removal and includes the installation of replacement trees in accordance with City requirements. The Project incorporates on-site open space areas with amenities, landscaping and bench seating at the street level, private balconies per unit, a common open space amenity decks at the fourth stories, a fitness center, common room, and bicycle parking. In addition, the Project proposes a contemporary architectural style with high-quality materials that enhances neighborhood character and includes pedestrian-scale elements such as a seating area and landscaping, as well as resident-serving amenities.
Downtown Area Plan
1. The Project conforms to applicable policies and design guidelines of the Downtown Area Plan. a. In conformance with Policy II.6, “Neighborhood Commercial Uses,” the Project includes ground floor retail space along S. B Street that will contribute towards this policy’s stated goal of serving the day to day shopping needs of existing and future residents. b. In conformance with Policy II.10 “Mixed-Use Commercial-Residential,” the Project includes multi-family residential uses with ground floor commercial integrated into the same building. c. In conformance with Policies III.7 and III.8, the Project includes pedestrian-scale improvements through new landscaping, bicycle parking, and street trees consistent with the Street Tree Master Plan. The project also includes visual and audible alert signals at the parking garage entry and exit points to enhance pedestrian and vehicle safety. d. The Project conforms to Policy II.0, Housing in the Retail Core, by creating new housing units within close proximity to the downtown area and Caltrain station. e. The reduced setbacks, increased building height, and varied stepbacks the Project incorporates are allowed as waivers under State Density Bonus Law (California Government Code Section 65915).
Site Plan and Architectural Review (SPAR)
1. The Site Plan and Architectural Review (SMMC Section 27.08.030) application and associated Conditions of Approval are approved based on the following findings:
a. The structures, site plan, and landscaping are in scale and harmonious with the character of the neighborhood in that:
330 of 786
i. The design and massing of the proposed buildings are appropriately scaled and compatible with the existing surrounding uses, which include an existing four-story mixed use building to the south, a five-story residential building to the west, a 10- story residential building on the same block, a six-story residential building to the north, and one and two-story mixed use and commercial/office buildings to the east. ii. The Project proposes a high-quality, contemporary mixed-use design, incorporating materials and details that positively enhance the existing character of the neighborhood and surrounding area.
iii. The Project provides site plan and landscape improvements that contribute to a welcoming and comfortable pedestrian experience within the Downtown. b. The development will not be detrimental to the harmonious and orderly growth of the City in that:
i. The Project has voluntarily included 114 off-street parking spaces, despite being exempted from minimum parking standards under State law, to accommodate expected demand for residential parking, in addition to implementing Transportation Demand Management measures through the C/CAG checklist. ii. The Project is consistent with the General Plan, Zoning Code, Downtown Area Plan, and the Multi-Family and Residential Mixed-Use Objective Design Standards, except where modifications are allowed under the State Density Bonus Law. iii. The Project is in conformance with the Bicycle Master Plan and the Citywide Pedestrian Master Plan.
c. The development will not impair the desirability of investment or occupation in the vicinity, and otherwise is in the best interests of the public health, safety, or welfare in that:
i. The Project provides additional housing opportunities including affordable housing units and, as conditioned, would not result in any significant impacts to public health, safety, or welfare.
ii. The Project will be constructed in compliance with all applicable building codes, fire codes, and the City’s building security requirements.
d. The development meets all applicable standards as adopted by the Planning Commission and City Council, conforms with the General Plan, and will correct any violations of the zoning ordinance, building code, or other municipal codes that exist on the site, in that:
i. The Project complies with applicable General Plan, Zoning Code, Downtown Area Specific Plan, and Objective Design Standards, subject to approval of the identified waivers under State Density Bonus Law. No violations of the Zoning Ordinance or Building Code were identified on the site. Therefore, the development meets all applicable standards as adopted by the Planning Commission and City Council, conforms with the General Plan and other applicable plans and policies. e. The development will not adversely affect matters regarding police protection, crime prevention, and security in that the buildings, paths of travel, and parking facilities will be required to conform to the City’s current Security Ordinance through Conditions of Approval, in that:
i. The Project complies with the City’s Security Ordinance by providing a physical security plan and a site lighting plan through the Conditions of Approval, which are intended to promote crime prevention.
Site Development Planning Application (SDPA)
331 of 786
1. The Project grading activities are exempt from the requirements for Site Development Planning Application per SMMC Section 23.40.030(d)(1), as the excavations below finished grade proposed for this project are for building footings within the footprint of the building. Therefore, the Site Development Planning Application review is limited to the major vegetation removal proposed.
2. All concerns regarding major vegetation removal have been addressed and the Site Development Planning Application (SMMC Section 23.40.040) and associated Conditions of Approval are approved based on the following findings and factors:
a. Whether the natural landscape and major vegetation is unnecessarily scarred through the proposed grading or removal of vegetation;
i. The Project will not scar the natural landscape or major vegetation as a result of the proposed grading or vegetation removal.
b. The report from the Project Arborist with respect to Protected Trees pursuant to Chapters
27.71 and 13.40;
i. The Project will result in the removal of six existing trees, of which two are considered protected trees. The removal of these trees is necessary to accommodate the development of the proposed Project. All trees will be removed and replaced with appropriate landscaping to both enhance the site and create necessary buffers between surrounding properties.
ii.All concerns regarding tree removal on the site have been addressed as conditions of approval requiring conformance to the City's landscape regulations, through the provision of new tree planting as shown on the project plans, and/or through the payment of a fee to the City’s tree planting fund.
332 of 786
CITY OF SAN MATEO PLANNING APPLICATION
CONDITIONS OF APPROVAL
PA-2025-039, 616 S B ST., SPAR+SDPA+ TENTATIVE PARCEL MAP 616 S B ST, SAN MATEO, 94401-4121 CA
PARCEL # 034194030
AS APPROVED BY THE CITY COUNCIL ON
The following conditions of approval apply to the Project referenced above. The conditions of approval are grouped under specific headings that relate to the timing of required compliance.
Additional language within a condition may further define the timing of required compliance. Types of Building permits include Demolition, Shoring/Excavation, Foundation, and Superstructure.
The following conditions shall be satisfied prior to issuance of a DEMOLITION PERMIT, BUILDING PERMIT FOR SHORING OR FOUNDATION, or SITE DEVELOPMENT PERMIT, whichever is issued first, or prior to the deadline specified in that condition.
Planning Division (PA)
1 APPROVED PLANNING APPLICATION CONFORMANCE – All building permit plans, details, and subsequent construction shall substantially conform with the approved planning application. This includes but is not limited to plans, materials, project description, and other items submitted as part of the approved planning application. Any proposed modifications to the approved planning application shall be reviewed and approved by the Community Development Director, or his/her designee, prior to construction of the proposed modifications. The Community Development Director, or his/her designee, shall determine whether the proposed modifications substantially conform with the approved planning application, or whether a planning application modification is required to be submitted to permit the proposed modifications, as required by Municipal Code Section
27.08.080 Modifications. (PLANNING)
2 BELOW MARKET RATE (BMR) AGREEMENT – Prior to the issuance of the building permit and in accordance with Municipal Code Section 27.16.050 and Resolution 131 (2010), the applicant shall enter into and record a BMR Affordability Restriction Agreement to provide BMR unit(s). The BMR unit(s) shall conform to all of the standards in Section VII of the BMR Guidelines as follows:
(A) Have exterior design and appearance compatible with and substantially the same as market rate units within the Project, including landscaping; (B) Be distributed throughout the development Project as approved by the City; (C) Have similar access to the unit from the exterior as market rate units; (D) Contain proportionately the same number of bedrooms as market rate units; (E) Generally be of comparable size of similar market rate units; (F) Have access to all on-site amenities;
(G) In phased development projects, be constructed proportionately in each phase; Exhibit A
333 of 786
PA-2025-039, 616 S B ST., SPAR+SDPA+ TENTATIVE PARCEL MAP As approved on _______________
and
(H) Interior unit amenities shall be, at minimum, UL or AGA-listed if amenities such as floor covering, appliances, and other fixtures differ from market rate units. The BMR Affordability Restriction Agreement shall be subject to the satisfaction of the Housing Manager, or their designee.
The BMR unit distribution and locations shall be in conformance with the BMR unit exhibit included on Sheets A2.14-A2.18 of the Project plans, or as modified and approved at the discretion of the Community Development Director, or their designee. (PLANNING) 3 CONDITIONS OF APPROVAL – This complete list of Conditions of Approval shall be reproduced onto the second sheet of all building permit plan sets. (PLANNING) 4 CONSTRUCTION EQUIPMENT VIBRATION - The contractor shall submit a construction vibration plan prepared by a technical expert subject to all standards and BMPs established in the Noise and Vibration Assessment by Illingworth & Rodkin, Inc., dated November 8, 2023, showing how vibration levels during demolition or construction will not exceed 0.3 in/sec Peak Particle Velocity (PPV) at the conventional buildings within 25 feet of the Project site. The contractor shall submit the plan to the City’s Planning and Building Divisions, subject to the satisfaction of the Director of Community Development, or his/her designee, prior to issuance of a demolition permit. At minimum, the construction vibration plan shall include:
(A) A list of all heavy construction equipment. The list shall also specify smaller equipment (less than 18,000 pounds) to be used near the property lines adjacent to the residential uses to the west of the Project site. (B) A schedule indicating the stages of construction anticipated to generate high vibration levels. The schedule shall also indicate at which points the contractor or his/her designee will submit reports to the Planning and Building Divisions to verify compliance with the plan. The reports shall include the activities that triggered alerts, the PPV readings, and the actions enacted to reduce the impact, all time and dated stamped. Reports shall be submitted to the Planning and Building Divisions at a minimum after demolition: shoring and tieback placement; excavation; pier placement; compaction activities; and any other activities that create a vibration reaching the threshold of 0.3 in/sec PPV.
(C) A list of demolition methods to be used in order to minimize vibration impacts.
Name and contact information for a designated Disturbance Coordinator(s) responsible for registering and investigating claims of excessive vibration, and coordinating any outreach or noticing to inform neighboring properties of activities that may generate high vibration levels.
334 of 786
PA-2025-039, 616 S B ST., SPAR+SDPA+ TENTATIVE PARCEL MAP As approved on _______________
(D) A plan to document conditions at all structures located within 25 feet of construction site, where access is granted, prior to, during, and after vibrationgenerating construction activities. (BUILDING/PLANNING) 5 CONSTRUCTION MANAGEMENT PLAN - Prior to issuance of any permits, the applicant shall submit a Construction Management Plan (CMP) for review and approval by the Community Development Director or their designee. The CMP shall be implemented throughout all phases of construction and shall include, at a minimum, the following components:
(A) Construction timeline (estimated) including major milestones (B) Construction Phasing Plan
(C) Project 24-Hour Liaison and Disturbance Coordinator Name and Contact Information
(D) Construction Sign as required in Pre-Construction Meeting Guide (E) Construction Hours Acknowledgment and Work Hour Waiver Requirements for Extended Operations (e.g. large concrete pours, crane hoists, etc.) (F) Winterization Plan (if excavation/grading will occur in wet season) (G) Documentation of Adjacent Street Condition (when applicable) (H) Traffic Control and Logistic Plan
(I) Road or Sidewalk Closure Plan
(J) Construction Hauling Routes
(K) Construction Worker Parking Location and Agreements (L) Construction Materials and Equipment Staging Plan
(M) Construction Equipment List including compliance with applicable Air Quality and Emission Regulations
(N) Erosion and Dust Control Plan
(O) Vibration Monitoring Plan
(P) Construction Noise Mitigation Plan
o This Plan shall comply with all standards and best management practices in the Noise and Vibration Assessment by Illingworth & Rodkin, Inc. dated November 8, 2023, showing how noise levels during demolition or construction will not exceed 90 A-Weighted Sound Level (dBA) at distance of 25 feet from the source of noise.
(Q) Vector Control Plan
A full list of requirements for this document can be found within the construction management plan guide available on the City website. Any modification to the approved 335 of 786
PA-2025-039, 616 S B ST., SPAR+SDPA+ TENTATIVE PARCEL MAP As approved on _______________
CMP throughout the construction process shall be subject to review and approval by the Community Development Director or their designee. (PLANNING) 6 NESTING BIRDS AND MIGRATORY RAPTORS - All potential nesting substrates (e.g., bushes, trees, grasses, and other vegetation) that are planned to be removed by the Project shall be removed prior to February 1 or after August 31, unless the applicant or his/her designee complies with the following procedures:
(A) Should construction activities be scheduled between February 1 and August 31, pre-construction surveys shall be conducted by a qualified ornithologist to ensure that no nests will be disturbed during Project implementation. These surveys shall be conducted no more than 14 days prior to the initiation of construction. During this survey, the ornithologist shall inspect all trees and other potential nesting habitats within 250 feet of the limits of construction activities. If an active nest is found sufficiently close to work areas to be disturbed by these activities, the ornithologist shall determine the extent of a construction-free buffer zone (typically 250 feet for raptors and 50 feet for other species), to ensure that nests of species protected by the Migratory Bird Treaty Act and California Department of Fish & Wildlife shall not be disturbed during Project implementation. These buffers may be increased or decreased, as appropriate, depending on the bird species and the level of disturbance anticipated near the nest with the permission of the ornithologist.
(B) The applicant shall submit a report prepared by a qualified ornithologist indicating the results of the survey and any designated buffer zones to the City’s Planning Division subject to the satisfaction of the Director of Community Development, or his/her designee. (PLANNING)
7 PAYMENT OF OUTSTANDING PLANNING APPLICATION FEES – The applicant shall pay all outstanding planning application fees. (PLANNING)
8 PARKING GARAGE IMPROVEMENTS – The plans shall show the following improvements at the parking garage per the recommendations included in the Transportation Impact Analysis dated April 23, 2026 prepared by Hexagon Transportation Consultations, Inc., subject to the satisfaction of the Director of Community Development, or his/her designee:
(A) Mirrors shall be included at the corners of ramps to improve visibility around 336 of 786
PA-2025-039, 616 S B ST., SPAR+SDPA+ TENTATIVE PARCEL MAP As approved on _______________
corners.
(B) A gate or other electrically operated closure shall be installed at the residential garage entrance on 7th Avenue to limit access to residents only (PLANNING). 9 COMMERCIAL TENANT SPACES – The applicant shall include details to address the following items on the plans at the time of building permit submittal:
(A) Access doors shall be included at each retail tenant space to provide access from the parking garage.
(B) Grease interceptors and ventilation infrastructure to support Type 1 & 2 Vent Hoods shall be installed at time of construction in commercial spaces for restaurant and similar uses.
(C) Restroom(s) with required fixtures to serve each commercial tenant space. (D) Utility connections and adequate amperage at each tenant space. (PLANNING) Building Division (PA)
10 ADDRESS ASSIGNMENT – The applicant shall submit an address assignment application for the proposed Project, subject to the review and approval by the Building Division. The Address Assignment Form is available at
https://www.cityofsanmateo.org/DocumentCenter/View/98206/CDD-AddressAssignment-Application-Form (BUILDING) 11 APPLICABLE BUILDING STANDARDS AND LOCAL CODES – All building permit plans shall demonstrate compliance with the applicable California Building Standards Codes and local amendments as adopted by the Building Division at the time of filing the building permit application. (BUILDING)
12 BAAQMD JOB NUMBER – The applicant shall submit an asbestos demolition and renovation notification job number (J#) from Bay Area Air Quality Management District. (BAAQMD). (BUILDING)
13 DEMOLITION – A building permit for demolition shall be issued in accordance with Section
23.06.100 of the San Mateo Municipal Code, to the satisfaction of the Building Official or his/her designee. (BUILDING)
337 of 786
PA-2025-039, 616 S B ST., SPAR+SDPA+ TENTATIVE PARCEL MAP As approved on _______________
14 PRE-CONSTRUCTION CONFERENCE FOR LARGE PROJECTS – A pre-construction conference shall be held at a time and location agreed upon by the City and applicant for the purpose of reviewing Conditions of Approval and construction-site procedures. The applicant shall be represented by his design and construction staffs, which include any sub-contractors.
Departments having conditions of approval for the Project will represent the City. This meeting shall be held prior to issuance of the Demolition Permit, Building Permit or Site Development Permit, and shall be satisfied prior to issuance of whichever permit is issued first. (BUILDING)
15 SITE SURVEY – The applicant shall provide a full site survey stamped and signed by a Land Surveyor licensed by the State of California. The survey shall include, but not be limited to:
location and dimensions of property lines, location of streets and easements, existing buildings, topographic contour lines, trees/landscape, and other structures. (BUILDING) 16 SOILS REPORT AND INVESTIGATION LETTER – The applicant shall submit a stamped, signed, and dated soils investigation report containing design recommendations and integrate recommendations into the plans as-appropriate, to the satisfaction of the Building Official or his/her designee. The applicant shall also submit a letter stamped and signed by the Geotechnical engineer of-record stating the plans and specifications substantially conform to the recommendations in the soil report, subject to the satisfaction of the Building Official or his/her designee. (A) The geotechnical report shall explicitly reference the most current Project plans and their version date, describe the current proposed building configuration, and address the Geotechnical Engineer’s review of and concurrence with the proposed underground stormwater treatment (silva cells) (BUILDING).
Fire Department (PA)
17 FIRE FLOW – The applicant shall provide fire flow information to the Fire Plan Checker, which is subject to the review and approval of the Fire Marshal or his/her designee. (FIRE) Public Works Department (PA)
18 CONSTRUCTION GENERAL PERMIT – For construction activities that will disturb one (1) acre or more, the Applicant shall file a Notice of Intent (NOI) with the State Water Resources Control Board under the Construction Stormwater General Permit (General Permit). Applicant shall provide proof of the General Permit and a Storm Water Pollution 338 of 786
PA-2025-039, 616 S B ST., SPAR+SDPA+ TENTATIVE PARCEL MAP As approved on _______________
Prevention Plan (SWPPP) prepared by a qualified SWPPP designer to Public Works. (PUBLIC WORKS)
19 ENCROACHMENT PERMITS, BONDS, AND INSURANCE – For any work within the public right-of-way, the applicant shall obtain an encroachment permit, posting the required bonds and insurance, and provide a one (1) year warranty for all work to be done in the City's right-of-way or easements prior to any work being done. (PUBLIC WORKS 20 GRADING AND DRAINAGE PLANS – The Project plans shall include grading and drainage plans that identify the vertical elevation datum, date of survey, and surveyor. Grading plans shall show existing topo and features at least 20’ beyond the Project boundary. Plan shall show existing topography, label contour elevations, drainage patterns, flow lines, slopes, and all other property encumbrances. (PUBLIC WORKS) 21 PARCEL MAP – The applicant shall have a parcel map prepared by a person authorized to practice land surveying in California, delineating all parcels created or deleted and all changes in lot lines in conformance with SMMC Chapter 26.56.
The parcel map shall be approved by the Department of Public Works and recorded with the County Recorder’s Office prior to the issuance of any City permits.
Prior to the City’s release of the parcel map to the title company, the applicant may, at the discretion of the Director of Public Works or designee, be required to submit to the City an electronic copy of the map in PDF and AutoCAD. (PUBLIC WORKS) 22 STORMWATER POLLUTION PREVENTION PERMIT – In accordance with SMMC Chapter
7.39.170, the applicant shall obtain a Stormwater Pollution Prevention (STOPPP) Construction permit for all work associated with stormwater pollution prevention, pay the required fees and post the required cash deposit. This permit is reviewed as part of the Building Permit and does not require a separate submittal. The fee amount will be based upon the Comprehensive Fee Schedule in effect at the time the building permit application is submitted. The Applicant shall be required to increase the deposit, at the discretion of the City, for any associated costs in excess of the deposit. Prior to final occupancy, the bill shall be paid in full. The City will refund any portion of the deposit not utilized. (PUBLIC WORKS)
339 of 786
PA-2025-039, 616 S B ST., SPAR+SDPA+ TENTATIVE PARCEL MAP As approved on _______________
23 TRAFFIC CONTROL & SITE LOGISTICS PLANS – The applicant shall submit traffic control plans for any impact to the right-of-way for each phase of operation, including phase durations and pedestrian and bicycle detour plans as applicable. The traffic control plan shall comply with the most recent version of the California Manual of Uniform Traffic Control Devices (CA MUTCD) and the City’s Traffic Control Plan Requirements.
CDD Arborist (PA)
24 LANDSCAPE UNIT IN LIEU FEES – Prior to the issuance of any building permit, the applicant shall pay in-lieu fees for existing trees to be removed as evaluated in the Tree Evaluation Schedule and Required Tree Planting form during the planning application.
Existing trees to be removed shall be replaced on-site, or a fee shall be paid in lieu of planting trees at the rate established in the annual Comprehensive Fee Schedule. (CDD Arborist)
25 REQUIRED TREE PLANTING FORM – The Required Tree Planting form shall be corrected to be consistent with the landscape plans and tree planting schedules. This form shall accurately reflect the in-lieu fees to be paid to the City prior to the building permit issuance (CDD ARBORIST)
26 STREET TREES – The landscape plans shall specify installation of street trees in accordance with the City of San Mateo Street Tree Master Plan. In accordance with Municipal Code Section 27.71.120(a)(1), 24-inch box shall be the minimum size for street trees planted along public streets and shall include tree grates and root barriers as specified by the City Standard Drawings 3-1-847 and 3-1-933. The landscape plans shall be subject to the review and approval of the Community Development Director, or his/her designee. (CDD
ARBORIST)
The following conditions shall be satisfied prior to issuance of a BUILDING PERMIT FOR THE SUPERSTRUCTURE.
Planning Division (PA)
27 CHILD CARE DEVELOPMENT FEE – The applicant shall pay a Child Care Development Fee subject to the rate established in the annual Comprehensive Fee Schedule in effect at the time of building permit issuance. (PLANNING)
28 COMMERCIAL LINKAGE – The applicant shall pay the Affordable Commercial Housing 340 of 786
PA-2025-039, 616 S B ST., SPAR+SDPA+ TENTATIVE PARCEL MAP As approved on _______________
Linkage Fee in accordance with Municipal Code Section 23.61 and (Planner: Choose one based on submittal date) Resolution 84 (2016) OR Resolution 111 (2021) subject to the rate established in the annual Comprehensive Fee Schedule in effect at the time payment is made. (PLANNING)
29 EXTERIOR ACOUSTICAL ANALYSIS – In compliance with General Plan Policy N 1.3, the applicant shall provide an acoustical analysis prepared by a qualified acoustical consultant for new multifamily common open space for residents that have an exterior noise level of 60 dBA (Ldn) or above, as shown on Figure N-2 of the General Plan. The applicant shall incorporate necessary mitigation measures into residential project design to minimize common open space noise levels. Maximum exterior noise should not exceed 65 dBA (Ldn) for residential uses. (PLANNING)
30 INTERIOR ACOUSTICAL ANALYSIS – In compliance with General Plan Policy N 1.2, the applicant shall provide an acoustical analysis prepared by a qualified acoustical consultant which shall contain recommendations to ensure the building’s interior noise levels comply with the levels established in the General Plan or Building Code, whichever is more restrictive, subject to the satisfaction of the Community Development Director, or his/her designee. (PLANNING)
31 LANDSCAPING AGREEMENT – The applicant shall provide proof of an agreement with a licensed landscape contractor or General Contractor for the duration of the Project’s Plant Establishment Maintenance Period, which consists of three (3) growing season months (March through October) for all proposed landscaped areas. (PLANNING) 32 LOCATION AND SCREENING OF ABOVE GROUND UTILITIES AND EQUIPMENT – All screening for any ground-level utilities, equipment, and other Project related operational/utility devices shall be shown on the building permit plans in substantial conformance with the approved planning application. All above ground utilities and equipment shall be screened with landscaping, fencing, and/or other solid materials to the satisfaction of the Community Development Director, or his/her designee. (PLANNING) 33 SCREENING OF ROOFTOP MECHANICAL EQUIPMENT – All rooftop mechanical equipment shall be shown on the building permit plans in substantial conformance with the approved planning application. All equipment shall be painted and/or screened by a solid enclosure or parapet wall with materials compatible with the building design subject to the 341 of 786
PA-2025-039, 616 S B ST., SPAR+SDPA+ TENTATIVE PARCEL MAP As approved on _______________
satisfaction of the Community Development Director, or his/her designee. (PLANNING) 34 SIGNAGE – Preliminary signage shown in the approved planning application plans are for information only. Final signage shall be reviewed and approved in accordance with Title 25 of the Municipal Code. (PLANNING)
Building Division (PA)
35 CALGREEN – The building permit plans shall incorporate the applicable CALGreen Checklist noting the green building measures the Project will incorporate in accordance with the California Green Building Standards Code and City of San Mateo Reach Codes subject to the review and approval by the Building Official, or his/her designee. Current City of San Mateo CALGreen checklists are located on Building Division webpage or will be provided by Community Development Department staff, if requested. (BUILDING) 36 WATER CONSERVATION IN LANDSCAPING – The applicant shall submit a completed Water Conservation in Landscaping Screening Form. If the screening form indicates the Project is subject to the Water Conservation in Landscaping Ordinance pursuant to Municipal Code Section 23.72.030, additional documentation prescribed by the screening form shall also be included with the site plan. City of San Mateo Water Conservation in Landscaping forms are located on Building Division webpage. The applicant shall submit the required landscape documentation package with building permit application subject to the review and satisfaction of the Building Official, or his/her designee. (BUILDING) Fire Department (PA)
37 CODE CONFORMANCE – The applicant shall indicate on all building permit plans that all construction shall meet current code standards at the time of building permit submittal.
The building permit plans are subject to review and approval by the Fire Marshal or his/her designee. (FIRE)
38 FIRE CONTROL ROOM – The plans shall show a fire control room with direct access from the exterior of the building subject to the requirements listed in the Fire Department’s local Ordinance and subject to the review and approval of the Fire Marshal or his/her designee. (FIRE)
342 of 786
PA-2025-039, 616 S B ST., SPAR+SDPA+ TENTATIVE PARCEL MAP As approved on _______________
39 FIRE DEPARTMENT SUBMITTALS – The applicant shall submit all plans involving fire systems (including but not limited to fire sprinklers, fire hydrants, and fire alarms) in conjunction with the superstructure building permit plans to the Fire Department. The plans are subject to review and approval by the Fire Marshal or his/her designee. (FIRE) 40 REMOTE POWER DISCONNECT – The plans shall show a key switch/shunt trip to disconnect the building electrical power and/or solar photovoltaic system by Fire Department personnel. The key switch/shunt trip location(s) shall be subject to the review and approval of the Fire Marshal or his/her designee. (FIRE) Police Department (PA)
41 BUILDING SECURITY CODE COMPLIANCE – The building permit plans shall comply with the City’s Building Security Code (San Mateo Municipal Code Chapter 23.54). (POLICE) 42 MIXED USE PARKING GARAGE SECURITY – The building permit plans for the superstructure shall show:
(A) Restricted access to the residential portion of the parking garage with electrically operated closures to allow passage of motor vehicles at all times. Required visitor parking shall have unrestricted access at all times.
(B) Restricted access to the portion of the parking garage intended to service commercial uses outside of standard business hours (restricted hours defined as bank holidays, Saturday, Sunday, and Monday through Friday from 6:00pm to 6:00am, or as specified in a shared use agreement the City is a party to). Outside of standard business hours the portion of the parking garage intended to serve commercial uses shall include electrically operated closures to allow passage of motor vehicles.
(C) The closures, whether overhead, sliding or swinging shall be provided with reopening devices which will function to stop and reopen the closure in case the closure is obstructed when closing.
(D) Openings into the garage which are not for vehicular or human passage shall be provided with security grilles or screens.
(E) Digital keypads and/or wireless “click to enter” systems complying with SECURED BUILDING ACCESS BY EMERGENCY PERSONNEL shall be provided to allow for entry into all 343 of 786
PA-2025-039, 616 S B ST., SPAR+SDPA+ TENTATIVE PARCEL MAP As approved on _______________
portions of the garage at all times.
(F) If egress doors are required by code to connect garage spaces with different uses, the egress doors shall be alarmed and monitored.
(G) Exterior doors or gates providing access into the secure areas of the parking garage shall remain locked at all times, and shall only be accessible through the use of keys, key fob or remote keyless entry system devices furnished to the building residents and shall be equipped with self-closing devices.
(H) All storage, maintenance, and trash rooms within parking garages shall have doors which cannot be locked from the inside, and that close and lock quickly and automatically upon exit.
(I) Parking spaces shall not be numbered to coincide with interior unit numbers. (J) Lighting in the parking garage shall be in conformance with the Security Ordinance as it applies to SITE LIGHTING. No dark areas shall exist inside the parking garage. (POLICE) 43 PHOTOMETRIC PLAN SUBMITTAL REQUIREMENT – The building permit plans for the superstructure shall include a photometric plan showing the installation of lighting fixtures and lighting levels to be reviewed and approved by the Chief of Police or his/her designee.
The photometric plan shall include point-by-point lighting levels in foot-candles for the entire plot and ten feet beyond the Project property lines. The point-by-point photometric plan shall provide lighting levels on a grid not to exceed five feet by five feet across the entire site. Each point shall report the illuminance to the nearest 0.1 footcandles. Photometric calculations including maximum foot-candles, average foot-candles, minimum foot-candles, average to minimum uniformity, and maximum to minimum uniformity shall be included on the plan submitted. Select specifications for fixtures selected shall be provided on the photometric plan sufficient to ensure compliance with the SITE LIGHTING STANDARDS. (POLICE)
44 PUBLIC SAFETY COMMUNICATIONS FOR TALL BUILDINGS – The building permit plans for the superstructure shall show compliance with Security Code SMMC “23.54.020 CITY COMMUNICATION SYSTEMS – HIGH RISE BUILDINGS”, by providing for the following allowances for the placement of emergency communications equipment on the building permit plans:
344 of 786
PA-2025-039, 616 S B ST., SPAR+SDPA+ TENTATIVE PARCEL MAP As approved on _______________
(A) Enough enclosed space for the equivalent of one dedicated server rack in a locked server room that is clean, dry, and well-ventilated (this does not need to be a fire control room);
(B) One 4” conduit from the designated server rack through the roof. The conduit shall be provided with wide radius bends, a weatherhead on the roof, and a pull string and ring; (C) Authorization to mount antennas on the roof. The maximum allowable distance from the designated server rack to the antenna mounting location shall be 100 feet; (D) One 20 amp, 120 VAC dedicated electrical circuit on the building's emergency generator. An uninterruptable power supply (UPS) may be installed by the City if the building is not provided with an emergency generator;
(E) 12 copper cable pairs to the building's main telephone terminal; and, (F) Ground buss bar bonded to the building grounding system.
This requirement is in addition to the requirement of the California Fire Code to supply a functional emergency responder radio coverage system. (POLICE) 45 SECURED BUILDING ACCESS BY EMERGENCY PERSONNEL – The building permit plans for the superstructure shall show the detailed specifications for and the installation of telephone entry pads (TEPs) and/or wireless “click to enter” systems at the main exterior building entrance(s) and parking garage entrance(s) for secured buildings. These access systems must allow emergency personnel to access all levels of the interior of the building.
The access systems must also be installed at exterior gate locations that lead to secured areas of the site, such as interior courtyards. Access system placement location is subject to the review and approval of the Chief of Police or his/her designee, prior to the approval of the first building permit for the Project. Police access codes shall be provided by the Chief of Police or his/her designee at the time of installation. (POLICE) 46 SITE FURNITURE – The building permit plans for the superstructure shall show permanent site furniture accessible to the public designed and installed to prevent an adult from laying down by installing arm rests not more than 4' apart, or by designing elevation changes 4" or more on horizontal surfaces every 4'. Temporary site furniture shall be secured at the close of each business day. (POLICE)
345 of 786
PA-2025-039, 616 S B ST., SPAR+SDPA+ TENTATIVE PARCEL MAP As approved on _______________
47 STAIRWELL & EXTERIOR DOORS – The building permit plans for the superstructure shall show the maximum allowable viewing panel in egress doors from stairwells and exterior doors leading to exterior areas, parking garages, and basement levels. (POLICE) 48 VIDEO SURVEILLANCE SUBMITTAL REQUIREMENT – The building permit plans for the superstructure shall include a plan showing the installation of cameras and approximate viewing fields of surveillance cameras to be reviewed and approved by the Chief of Police or his/her designee. The plan shall include cameras placed to view areas as required by VIDEO SURVEILLANCE STANDARDS, and include select specifications for cameras and storage equipment to ensure compliance with the VIDEO SURVEILLANCE STANDARDS. (POLICE)
Public Works Department (PA)
49 C3 COMPLIANCE – The Project shall provide stormwater controls and treatment measures in compliance with the requirements of the Municipal Regional Permit NPDES Permit # CAS612008 and the San Mateo County C.3 Stormwater Technical Guidance. The Project’s grading, drainage, and treatment designs shall be in substantial conformance with the approved plans and subject to the final approval of the City Engineer or designee. All underground stormwater treatment facilities shall be located outside a plane forming a 45-degree angle with the vertical extension of the foundation plane in accordance with the recommendations in the Geotechnical Report Update for Mixed-Use Building at 606 – 616 South B Street letter dated March 20th, 2026.
The Project plans shall include a Stormwater Management Plan that identifies the Project site area, new and/or replaced pervious and impervious areas, drainage management areas, treatment measures, sizing calculations, source controls and site design measures implemented, saturated hydraulic conductivity rates at relevant locations or hydrologic soil type (A, B, C, or D) and information sources, elevations of seasonal high groundwater table, and a summary of how the Project complies with C.3 requirements.
Treatment measures shall be sized to accommodate runoff their full tributary drainage area or provide a separate bypass system such that the treatment measure is not surcharged and act as a bypass. (PUBLIC WORKS)
50 COVERED PARKING DRAINAGE – The building permit plans for the superstructure shall show that water from the covered parking garage shall not be discharged onto the public 346 of 786
PA-2025-039, 616 S B ST., SPAR+SDPA+ TENTATIVE PARCEL MAP As approved on _______________
street. The applicant shall direct discharge from covered or underground garage to the City's sanitary sewer system. Stormwater runoff from the roof or other exposed areas of the Project shall not discharge to these garage drains. (PUBLIC WORKS) 51 DRAINAGE – The Project shall be designed to maintain or reduce the stormwater runoff peak flow at each of the Project’s discharge point(s) to the public storm drain system. The Project shall direct all runoff directly to the City’s storm drain system without passing through adjacent properties not part of this Project. Applicant shall submit plans, drawings, and storm calculations to demonstrate the design complies with these requirements. (PUBLIC WORKS)
52 ENCROACHMENT & MAINTENANCE AGREEMENT – Property owner shall enter into an encroachment & maintenance agreement for the bike racks and benches encroaching into a Public Utility Easement or public right of way prior to the issuance of the building permit.
The applicant shall have the agreement recorded against the owner’s property that indemnifies and holds harmless the City, its elected and appointed officials, employees and agents. The agreement shall include language in which the applicant agrees to allow access to any utility company wishing to have access to the public right-of-way for existing or new utility installation. The agreement shall also include language that requires the removal of the improvements, at the owner’s expense, should the City desire to use the right-of-way for or other purposes identified by the Director of Public Works or designee.
The agreement shall be approved as to form by the City Attorney’s Office and shall be recorded against the owner’s property prior to the issuance of any City encroachment permit. (PUBLIC WORKS)
53 FOOD SERVICE EQUIPMENT CLEANING – The applicant of any food service facilities shall have any sink or other floor mat, container, and equipment cleaning area, connected to a grease interceptor prior to discharging to the sanitary sewer system. The cleaning area shall be large enough to clean the largest mat or piece of equipment to be cleaned. The cleaning area shall be indoors or in a covered outdoor area; either areas being plumbed to the sanitary sewer. Outdoor cleaning areas shall be designed to prevent stormwater runon from entering the sanitary sewer and to prevent stormwater run-off from carrying pollutants to the site storm drains. Signs shall be posted indicating that all food service equipment washing activities shall be conducted in this area. Regular maintenance and cleaning of the grease interceptor is required. (PUBLIC WORKS) 347 of 786
PA-2025-039, 616 S B ST., SPAR+SDPA+ TENTATIVE PARCEL MAP As approved on _______________
54 GARBAGE/RECYCLE/COMPOSTING STORAGE AND SERVICE – The applicant shall provide an adequate area for the purposes of storing garbage, recycling, composting collection containers for scheduled servicing by the franchise solid waste collection service. The containers shall be placed at the service location allowing enough room for the truck to safely approach the containers. The collection containers shall be brought to the service area and returned to the storage enclosure by the property owner. The containers are not to be in public view or in the public right-of-way prior to, or beyond the scheduled service times. A letter shall be provided from the City’s franchise solid waste collection service provider stating that service is available to the Project as designed. The building permit plans for the superstructure shall show garbage and recycling areas. (PUBLIC WORKS) 55 PARKING LOTS – The building permit plans for the superstructure shall include all proposed off-street parking lots, showing ramp profiles and parking dimensions in conformance with City Standards. (PUBLIC WORKS)
56 PUBLIC IMPROVEMENTS – The applicant shall have improvement plans prepared for all work in the public right-of-way or easements by a licensed civil engineer. The improvement plans shall substantially conform to the approved planning application and shall be approved by the Director of Public Works or designee. All work within the City’s right of way shall be designed and constructed to the City Standards and Specifications unless otherwise noted. All public improvements shall be completed prior to the Certificate of Occupancy.
An Encroachment Permit shall be required for all public improvements in the public rightof-way or easements. All work shown on the improvement plans shall be inspected and approved by Public Works. The developer shall repair or replace all existing or new improvements that were damaged or removed because of developer's operations.
The public improvement plans shall show the following public improvements in the public right of way:
(A) STANDARD PUBLIC IMPROVEMENTS – sidewalks, curbs, gutters, traffic signage, pavement striping, curb markings, curb ramps, driveway approaches, sewer lateral connection, storm drain connections, manholes, catch basins. (B) LOADING ZONE – The applicant shall install a loading zone as shown on the approved plans.
348 of 786
PA-2025-039, 616 S B ST., SPAR+SDPA+ TENTATIVE PARCEL MAP As approved on _______________
(C) STORM MAIN - The applicant shall extend the City storm drain line along 6th Avenue and South B Street to the existing City storm drain line at 8th Avenue and South B Street as depicted in the approved planning application plans. Manholes, catch basins, lateral connections, and other structures shall be included as necessary.
(D) STREETLIGHTING IMPROVEMENTS – The applicant shall provide streetlight improvement plans with the civil plans a The Streetlight Improvement Plan shall:
1. Implement the Project’s Lighting Plan from their Project frontage to the roadway centerline.
2. Implement improvements beyond the Project frontage or the roadway centerline if such improvements are necessary to provide a functioning lighting system.
3. Show all work necessary to construct the streetlight improvements for which the Project is responsible to implement.
4. Include all electrical calculations (i.e. voltage drop) required for design of a functional streetlight system that complies with all applicable codes and standards.
5. Shows location of connection to existing streetlight circuit(s).
6. Shows location of proposed new electrical service connections.
7. Include a map showing the full extent of all streetlight circuits that will include Project lighting improvements. This map shall include information necessary for verifying voltage drop calculations and may also be used for submittal to the serving utility as part of an electrical service modification application. At a minimum the map shall include:
a. Location and wattage of all streetlight luminaires on the circuit. b. Streetlight pole numbers.
c. Length of conduit runs used for voltage drop calculations.
Lengths may be labeled directly on the plan view or presented in a conduit run schedule.
349 of 786
PA-2025-039, 616 S B ST., SPAR+SDPA+ TENTATIVE PARCEL MAP As approved on _______________
It shall be the applicant’s responsibility to verify the location of all existing streetlight equipment and infrastructure, including, but not limited to, underground conduits, pull boxes, poles, and electrical service connections, as needed for the preparation of the Lighting Plan and the Streetlight Improvement Plan. The applicant shall be responsible for coordinating all lighting improvements with the serving utility, including preparing all required documents and attachments, attending all field meetings requested by the serving utility, submitting applications for new or modified electrical service.
The applicant shall be responsible for all costs charged by the serving utility associated with the Project’s streetlight improvements, including but not limited to application fees, permit fees, engineering charges, and construction charges. (PUBLIC WORKS) 57 SEPARATE WATER METERS – When a development includes multiple uses, there shall be a separate water meter for each development use. The building permit plans for the superstructure shall show the separate water meters. (PUBLIC WORKS) 58 SIDEWALK EASEMENT - The applicant shall dedicate a sidewalk easement within the Project site as delineated in the approved planning application plans. The easement shall be dedicated through the parcel map. The easements shall be approved by the Director of Public Works or designee, recorded with the County Recorder’s Office, and a recorded copy of the document returned to the City prior to the release of the building permit for the superstructure.
59 STORM AND SEWER INPSECTION – The applicant shall perform an initial inspection (via remote TV camera) of the storm and sanitary sewer mains from the nearest upstream structure to the nearest downstream structure of the Project’s points of connections.
During the initial inspection, any damage must be reported to the Department of Public Works. The applicant shall perform the same inspection once construction is completed.
Damage in result of this Project’s construction shall be repaired by the applicant at their sole expense. (PUBLIC WORKS)
60 STORM DRAIN INLETS AND WATERWAYS – The building permit plans shall show the marking of the words “No Dumping! Flows to Bay,” or equivalent, on all storm inlets surrounding and within the Project site using methods approved by the City standards, consistent with the San Mateo Countywide Water Pollution Prevention Program’s C.3 requirements (PUBLIC WORKS)
350 of 786
PA-2025-039, 616 S B ST., SPAR+SDPA+ TENTATIVE PARCEL MAP As approved on _______________
61 STREETLIGHTS PHOTOMETRICS – The applicant shall provide a lighting “photometrics” plan for streetlights in the public right-of-way with the civil plans. The lighting plan shall comply with the following:
(A) Be based on photometric analysis consistent with the Illuminating Engineering Society’s (IES) Recommended Practice For Design And Maintenance Of Roadway And Parking Facility Lighting (ANSI/IES RP-8-18) and achieve the required lighting levels using the least number of luminaires possible, using a consistent pattern of luminaire placement, and shall include luminaires on both sides of the street if such a pattern reduces the number of luminaires required, unless otherwise approved by the City. Utilize the City’s list of standard luminaires at the time of design for selection of any new or replacement luminaires proposed by the Project. (B) Include a design for lighting all public streets, intersections, sidewalks, pedestrian paths, and bicycle facilities located in the public roadway right-of-way adjacent to the Project site to meet the lighting levels per the photometric analysis.
Include only City owned streetlights within the public right-of-way, or located in an easement on private property, unless otherwise approved by the City. (C) Include pedestrian scale lighting if pedestrian scale lighting is already in use on the block of the Project frontage, or if the City’s Pedestrian Master Plan recommends pedestrian scale lighting on the Project frontage.
(D) Include separate analysis zones for each street, each sidewalk by frontage, and each intersection, configured according to the City’s standard practice in use at the time the analysis is begun. Show each photometric analysis zone with point illuminance values.
(E) Include the following information about each luminaire included in the analysis:
i. Location
ii. Type (Indicated by the City’s specification name)
iii. Mounting height
iv. Arm length
v. Total luminaire Light Loss Factor (LLF)
(F) Include a table displaying the following values for the analysis zones:
i. Average Maintained Illuminance (fc)
ii. Average Uniformity Ratio
iii. Maximum Uniformity Ratio
iv. Maximum Point Illuminance Value (fc)
v. Minimum Point Illuminance Value (fc)
(G) Maintain the following minimum spacing between luminaires:
351 of 786
PA-2025-039, 616 S B ST., SPAR+SDPA+ TENTATIVE PARCEL MAP As approved on _______________
i. 50 feet between pedestrian scale luminaires on the same side of the street ii. 100 feet between all other types of luminaires on the same side of the street.
iii. 50 feet between luminaires of mixed types.
iv. Reduced spacing may be approved by the City if the photometric analysis indicates it is necessary to meet the required lighting levels. (H) The Project is required to meet the following RP-8-18 Table 11-1 & 12-1 light levels:
i. 6th Avenue Roadway: 0.7 fc Average, 6.0 Average Uniformity Ratio, 10.0 Max Uniformity Ratio
ii. B Street Roadway: 0.8 fc Average, 3.5 Average Uniformity Ratio, 6.0 Max Uniformity Ratio
iii. 7th Avenue Roadway: 0.7 fc Average, 6.0 Average Uniformity Ratio, 10.0 Max Uniformity Ratio
iv. 6th Avenue Sidewalk: 0.5 fc Average, 4.0 Average Uniformity Ratio v. B Street Sidewalk: 0.5 fc Average, 4.0 Average Uniformity Ratio vi. 7th Avenue Sidewalk: 0.5 fc Average, 4.0 Average Uniformity Ratio vii. 6th Avenue Roadway/B Street Intersection: 1.5 fc Average, 4.0 Average Uniformity Ratio
viii. 7th Avenue Roadway/B Street Intersection: 1.5 fc Average, 4.0 Average Uniformity Ratio (PUBLIC WORKS).
62 TRANSPORTATION IMPROVEMENT FEE – The applicant shall pay a fee proportional to the Project's share of transportation improvements needed to serve cumulative development within the City of San Mateo, as established by SMMC Chapter 27.13 and based on the Comprehensive Fee Schedule in effect on the date the complete SB 330 Preliminary Application was submitted. The fee shall be collected by the Public Works Department and paid prior to issuance of the first superstructure building permit. (PUBLIC WORKS) 63 TRASH CAPTURE DEVICES – The building permits shall show installation of trash capture devices in storm drain systems that lead directly to the off-site storm drain system or outfall. Devices shall be approved by the Director of Public Works or designee. Trash capture devices are required on site consistent with the State Water Resources Control Board definition of Full Capture System. All on-site trash capture devices shall be cleaned routinely and maintained by the Owner per the Stormwater Treatment Facilities Maintenance Agreement. The building permit plans for the superstructure shall show trash capture devices. (PUBLIC WORKS)
352 of 786
PA-2025-039, 616 S B ST., SPAR+SDPA+ TENTATIVE PARCEL MAP As approved on _______________
64 TRIANGULAR AREA OF VISIBILITY – The building permit plans for the superstructure shall show that the installation of landscaping and permanent structures located within the 10' triangular area of visibility at the driveways, and 45’ triangular area of visibility at any Project corner meets the requirements of a minimum vertical clearance of 7', and/or are less than 3' in height. This includes all tree canopies and other landscaping, PG&E above ground structures and other utility facilities. Additionally, a pedestrian warning system shall be installed at the garage exit on 7th Avenue where the 10’ triangular area of visibility requirement at the driveway is not met. (PUBLIC WORKS) 65 UNDERGROUND UTILITIES – The building permit plans for the superstructure shall show the installation of all new, and upgraded, utility services, including telephone, electric power, and other communications lines underground to the building in accordance with City of SMMC 26.32.020. Transformers and switch gear cabinets shall be placed on private property or within a utility easement. (PUBLIC WORKS)
66 UTILITIES – Utility plans shall be submitted as part of the building permit plans for the superstructure and shall show appropriate line types and labels to identify different type of utilities and pipe sizes. Clearly identify both existing and proposed public and private utilities.
The Developer shall provide joint trench composite plans for the underground electrical, gas, telephone, cable television, and communication conduits and cables including the size, location and details of all trenches, locations of building utility service stubs and meters and placements or arrangements of junction structures.
Sanitary sewer laterals and/or water meters located in driveways shall have traffic rated boxes and lids.
Developer is required to confirm the location of existing utility lines along the Project frontage by potholing. Prior to any potholing, developer shall obtain an encroachment permit and submit a pothole plan for City review and approval. Developer shall provide the pothole results to the Director of Public Works or designee or designee prior to final design. Any utility conflicts shall be the responsibility of the developer to rectify. (PUBLIC WORKS)
67 WASTEWATER CAPACITY CHARGE – A wastewater capacity charge, as established by 353 of 786
PA-2025-039, 616 S B ST., SPAR+SDPA+ TENTATIVE PARCEL MAP As approved on _______________
SMMC Chapter 7.38.065, is imposed on all new development to recover a proportionate share of costs for existing and future wastewater system facilities and assets from new or expanded connections to City wastewater systems. The applicable wastewater capacity charge is determined by use, wastewater flow, and wastewater strength loadings and the amount shall be established by City Council resolution. The fee shall be collected by the Public Works Department and paid prior to issuance of the first superstructure building permit. The fee shall be based on the Comprehensive Fee Schedule in effect on the date the complete SB 330 Preliminary Application was submitted. (PUBLIC WORKS 68 WATER SUPPLY SERVICE – A Will Serve Letter from the water company shall be supplied to the Director of Public Works or designee. The letter shall include a statement of the improvements proposed to be made or previously installed as to the adequacy of such installations and the rights-of-way or easements therefor or proposed; Required water supply service improvements shall be coordinated or constructed by the Applicant at no cost to the City. (PUBLIC WORKS)
The following conditions shall be met prior to RELEASE OF UTILITIES, FINAL INSPECTION, ISSUANCE OF A TEMPORARY CERTIFICATE OF OCCUPANCY, or ISSUANCE OF A CERTIFICATE OF OCCUPANCY, whichever occurs first.
Planning Division (PA)
69 ACOUSTICAL COMPLIANCE LETTER – The applicant shall submit an acoustical compliance letter to the Project Planner written and signed by the Project acoustical consultant indicating all recommendations incorporated into the Project to reach compliance with the noise limits listed in Tables N-1 and N-2 of the Noise Element of the General Plan. This letter shall be submitted prior to scheduling the Planning Final Inspection. (PLANNING) 70 LANDSCAPE VERIFICATION LETTER – The applicant shall submit a landscape verification letter to the Project Planner written, signed, and stamped by the Project landscape architect indicating that all on-site and off-site landscape improvements (including on-site trees, street trees, shrubs, and irrigation systems) have been installed in compliance with the approved landscape plans. This letter shall be submitted prior to scheduling the Planning Final Inspection. (PLANNING)
71 PLANNING FINAL INSPECTION – Upon completion of all construction and landscaping, the applicant shall request the Project Planner conduct a Planning Final inspection for verification of compliance with all outstanding conditions of approval. The applicant shall 354 of 786
PA-2025-039, 616 S B ST., SPAR+SDPA+ TENTATIVE PARCEL MAP As approved on _______________
contact the Project Planner to schedule each inspection a minimum of 72 hours in advance of the requested inspection. (PLANNING)
Building Division (PA)
72 ART IN PUBLIC PLACES – The applicant shall comply with Section 23.60 of the San Mateo Municipal Code for Art in Public Places. (BUILDING)
73 SOIL FINAL REPORT – The Geotechnical Engineer or Civil Engineer who prepared the soil investigation, or an equally qualified professional, shall issue a final report stating the completed pad, foundation, finish grading and associated site work substantially conform to the approved plans, specifications and investigations, to the satisfaction of the Building Official or his/her designee. (BUILDING)
Fire Department (PA)
74 EMERGENCY RESPONDER RADIO COVERAGE – An Emergency Responder Radio Coverage system may be required for this Project. Testing shall occur during construction due to circuit protection requirements that will affect building design. The applicant shall provide a third-party testing grid report to the Fire Department subject to the review and approval by the Fire Marshal or his/her designee prior to the Fire Final Inspection. (FIRE) 75 FIRE HYDRANTS – The applicant shall install the approved number of public/private fire hydrant(s) spaced as per the Fire Department’s local Ordinance. All fire hydrants used for fire flow for the Project site shall be upgraded to a Clow model 960 or equivalent consisting of (2) 2-½ inch and (1) 4-½ inch outlets. Each hydrant shall be capable of providing a minimum fire flow of 1500 gpm at 20 psi residual pressure. Water supply for fire protection is required to be installed in accordance with water purveyor’s specifications. The water supply shall be tested, flushed and approved operable prior to any combustible construction materials being placed on the site. Staged construction shall insure that the necessary water supply is maintained from stage to stage in the construction planning. The letter shall be submitted to the Fire Marshal or his/her designee for review and approval prior to the Fire Final Inspection. (FIRE) Public Works Department (PA)
76 OUTSTANDING CHARGES – Prior to occupancy, the applicant shall pay any outstanding charges due to the City that were applied to the Project during the construction of the 355 of 786
PA-2025-039, 616 S B ST., SPAR+SDPA+ TENTATIVE PARCEL MAP As approved on _______________
Project in accordance with the Comprehensive Fee Schedule in effect for the Building Permit. (PUBLIC WORKS)
77 RECORD DRAWINGS – The applicant shall submit record or as-built drawings, in PDF and AutoCAD formats, for all off-site improvements to the Department of Public Works. All public improvements shall be shown on the record drawings as constructed in the field. (PUBLIC WORKS)
78 RESTORATION OF ROADWAY – Due to the anticipated construction and the Project’s truck traffic, the applicant shall grind and overlay the full width of 6th Avenue, B Street and 7th Avenue along the Project frontage including the intersections with 2.5 inches of asphalt concrete. If the street abutting the property has been classified as being in a failed condition or a Pavement Condition Index (PCI) of 50 or below, the applicant will be required to reconstruct the street subject to the review and approval of the Director of Public Works or designee. (PUBLIC WORKS)
79 STORM WATER TREATMENT FACILITIES MAINTENANCE AGREEMENT – The applicant shall execute a maintenance agreement with the City’s Director of Public Works or designee as specified in SMMC Chapter 7.39 of the Stormwater Management and Discharge Control ordinance and the San Mateo Countywide Water Pollution Prevention Program C.3 Program Technical Guidance. The agreement shall outline the continuous operation and maintenance (O&M) plan for the permanent storm water treatment facilities including irrigation and landscape maintenance of treatment measures constructed in the public right-of-way and private property and shall be recorded with the County Recorder’s Office.
This agreement shall be executed prior to the first occupancy of the building. (PUBLIC WORKS)
The following conditions shall be met prior to the approval of the FINAL MAP or PARCEL MAP.
Public Works Department (PA)
80 PUBLIC IMPROVEMENT AGREEMENT - The applicant shall enter into a public improvement agreement with the City per Gov. Code Section 66462(a) and shall arrange to provide security for the remaining public improvements to be completed. This agreement shall be recorded against the property. Alternatively, the applicant may provide a cash deposit to guarantee the public improvements will be completed. (PUBLIC WORKS) The following conditions shall be complied with AT ALL TIMES DURING THE CONSTRUCTION PHASE 356 of 786
PA-2025-039, 616 S B ST., SPAR+SDPA+ TENTATIVE PARCEL MAP As approved on _______________
OF THE PROJECT.
Planning Division (PA)
81 ARCHAEOLOGICAL RESOURCES – In the event of the discovery of archaeological resources whether on-site or in the public right-of-way, the applicant shall halt all construction activities, notify the Planning Manager and/or Project Planner, and retain a qualified archaeologist. The archaeologist shall evaluate the uniqueness of the find, contact local Native American and Historical organizations for proposed recommendations for continuing construction, and submit a summary of findings to the Project Planner. The applicant shall incorporate the recommendations of the local Native American and Historical organizations when continuing construction. (PLANNING) 82 CONSTRUCTION MANAGEMENT PLAN COMPLIANCE – The applicant shall implement and remain in full compliance with the approved Construction Management Plan throughout all phases of construction. All construction activities shall be conducted in a manner consistent with the approved plan. Any deviation from, or modification to the approved Construction Management Plan shall require prior review and approval by the Community Development Director or their designee. Consistent with the requirements of the CMP, construction disturbances reports shall be submitted monthly to provide timely updates on Project impacts.
Violations of any portion of the approved Construction Management Plan or other applicable construction management requirement may result in the issuance of a “Stop Work Order”. (PLANNING)
83 CULTURAL RESOURCES – In the event of the discovery of human remains whether on-site in the public right-of-way, the applicant shall halt all activity within 50 feet of the discovery and notify the Planning Manager and/or Project Planner. The applicant shall also immediately notify San Mateo County Coroner to have a determination made as to whether the remains are of Native American origin or whether an investigation into the cause of death is required. Treatment of human remains and any associated or unassociated funerary objects discovered during any soil-disturbing activity within the Project site shall comply with applicable State laws. If the remains are determined to be Native American, the Coroner will notify the Native American Heritage Commission (NAHC) immediately. Once the NAHC identifies the most likely descendants, the descendants will make recommendations regarding proper burial, which will be implemented in accordance with Section 15064.5(e) of the CEQA Guidelines. (PLANNING) 357 of 786
PA-2025-039, 616 S B ST., SPAR+SDPA+ TENTATIVE PARCEL MAP As approved on _______________
84 CULTURAL RESOURCES MONITOR – Should construction monitoring be required, the applicant shall submit a scope of work with a cultural resources monitor as prescribed by the Archaeological Monitoring Plan. The scope of work shall indicate that, in the event of a discovery, the monitor:
(A) Has stop-work authority to halt all construction activities; (B) Will notify the Planning Manager and/or Project Planner; (C) Will evaluate the discovery to determine whether additional treatment is warranted; and,
(D) Will determine adequacy of the evaluation of the discovery prior to authorization of construction activities to resume. (PLANNING)
85 FRAME/PLANNING ROUGH INSPECTION – Upon completion of all framing and prior to the installation of exterior sheathing and windows, the applicant shall request the Project Planner conduct a Rough Frame inspection to verify items including, but not limited to, window locations, window sizes, and massing. The applicant shall contact the Project Planner to schedule each inspection a minimum of 72 hours in advance of the requested inspection. (PLANNING)
86 PALEONTOLOGICAL RESOURCES – In the event of the discovery of paleontological resources (fossils) whether on-site or in the public right-of-way, the applicant shall halt all construction activities within 50 feet of the discovery, notify the Planning Manager and/or Project Planner, and retain a qualified paleontologist to determine the significance of the discovery. The paleontologist shall evaluate the uniqueness of the find, prepare a written report documenting the find and recommending further courses of action, and submit a summary of findings to the Project Planner. The applicant shall incorporate the recommendations of the paleontologist when continuing construction. (PLANNING) Fire Department (PA)
87 ADDRESS NUMBERS – The applicant shall post temporary address numbers on each building at the Project site that must be easily visible from the street or fire access road. (FIRE)
88 BARRICADES ACROSS EMERGENCY ACCESS ROADS – Prior to the installation or use of 358 of 786
PA-2025-039, 616 S B ST., SPAR+SDPA+ TENTATIVE PARCEL MAP As approved on _______________
barricades, fences, or gates across emergency vehicle access roads during construction, the applicant submit plans to the Fire Plan Checker subject to the review and approval of the Fire Marshal or his/her designee. (FIRE)
89 DEMOLITION – The applicant shall comply with the California Fire Code Chapter 33 during all phases of construction of the Project. (FIRE)
90 EGRESS – The applicant shall maintain required egress for all adjacent buildings/properties. (FIRE)
91 STANDPIPES – For projects that require standpipes by California Fire Code Section 905.3.1, the applicant shall provide not less than one standpipe for use during construction or demolition. (FIRE)
Public Works Department (PA)
92 BEST MANAGEMENT PRACTICES (BMP) – The applicant shall perform all construction activities in accordance with the City’s Storm Water Management and Discharge Control Rules and Regulations (SMMC 7.39), and the San Mateo Countywide Water Pollution Prevention Plan (SMCWPPP) Construction Best Management Practices. (PUBLIC WORKS) The following conditions shall be complied with AT ALL TIMES that the project permitted by this planning application occupies the premises.
Planning Division (PA)
93 APPROVED PLANNING APPLICATION CONFORMANCE AT ALL TIMES – All physical improvements, uses, and operational requirements authorized by the approved planning application shall, at all times that the use permitted by this planning application occupies the premises, substantially conform with the approved planning application. This includes but is not limited to plans, materials, project description, and other items submitted as part of the approved planning application. Any proposed modifications to the approved planning application shall be reviewed and approved by the Community Development Director, or his/her designee, prior to construction of the proposed modifications. The Community Development Director, or his/her designee shall determine whether the proposed modifications substantially conform with the approved planning application, or whether a planning application modification is required to be submitted to permit the proposed modifications, as required by Municipal Code Section 27.08.080 Modifications. 359 of 786
PA-2025-039, 616 S B ST., SPAR+SDPA+ TENTATIVE PARCEL MAP As approved on _______________
(PLANNING)
94 GENERAL PLAN COMPLIANCE – Unless otherwise approved through the entitlement process, the Project shall be designed, constructed, and operated in a manner that is consistent with all applicable goals, policies, land use designations, and development standards of the City’s adopted General Plan 2040. (PLANNING) 95 ONGOING LANDSCAPE MAINTENANCE – All landscaped areas shall be maintained free of litter, debris and weeds. All plantings shall be permanently maintained in a healthy growing condition and, whenever necessary, replaced with equivalent plant materials to ensure continued conformance with approved plans. (PLANNING) 96 TANDEM PARKING SPACES – Any pair of parking stalls designed in tandem configuration shall be assigned to or reserved for the same residential unit. Any pair of tandem stalls shall not be divided between different residential units (PLANNING).
Public Works Department (PA)
97 C/CAG TRANSPORTATION DEMAND MANAGEMENT (TDM) PROGRAM – The Project shall comply with the San Mateo City/County Association of Governments (C/CAG) Congestion Management Program Land Use Implementation Policy (C/CAG TDM Policy). Specifically, the Project shall ensure that the measures identified in the C/CAG TDM Checklist approved with the planning application are implemented over the life of the Project, and that the property owner and tenants acknowledge the requirement to participate in the periodic monitoring and reporting requirements identified in the C/CAG TDM Policy.
Accordingly, it is recommended that the property owner and/or developer clearly identify these TDM provisions and responsibilities in any sales and/or lease or sublease agreements. (PUBLIC WORKS)
98 POST CONSTRUCTION BEST MANAGEMENT PRACTICES (BMP) – In accordance with the City’s Storm Water Management and Discharge Control Rules and Regulations, SMMC Chapter 7.39, and the San Mateo Countywide Stormwater Management Plan (SWMP) by reference, the applicant shall:
(A) Adhere to the requirements and obligations identified in the stormwater treatment operation and maintenance agreement to include performing 360 of 786
PA-2025-039, 616 S B ST., SPAR+SDPA+ TENTATIVE PARCEL MAP As approved on _______________
inspection, maintenance, documentation, and payment of fees. (B) Label new and redeveloped storm drain inlets with the phrase “No Dumping – Drains to Bay” plaques to alert the public to the destination of storm water and to prevent direct discharge of pollutants into the storm drain. Template ordering information is available from the Department of Public Works.
All process equipment, oils fuels, solvents, coolants, fertilizers, pesticides, and similar chemical products, as well as petroleum based wastes, tallow, and grease planned for storage outdoors shall be stored in covered containers at all times (PUBLIC WORKS).
Police Department (PA)
99 PUBLIC SAFETY COMMUNICATIONS FOR TALL BUILDINGS, ACCESS AND SECURITY – The applicant shall allow 24 hour, 7 day per week access to the dedicated public safety communications radio server rack and antenna(s) for maintenance purposes at all times that the use permitted by this planning application occupies the premises. If the City installs radio equipment, applicant shall take reasonable measures to secure and safeguard City equipment from theft or vandalism. (POLICE) 100 SITE LIGHTING STANDARDS – Exterior security lighting in compliance with the Building Security Code “Exterior Security Lighting” (San Mateo Municipal Code Section 23.54.060) shall be provided and maintained at all times that the use permitted by this planning application occupies the premises. Site lighting shall comply with the requirement of an average illuminance of 1 foot-candle, a minimum illuminance of 0.3 foot-candle, and a uniformity ratio not to exceed 4:1 average to minimum. Light sources shall be capable of producing a “bright white” light with a color temperature between 3000K and 4000K and a color rendering index (CRI) of at least 65 unless otherwise approved. This lighting standard is applicable to all parking lots, driveways, circulation areas, aisles, passageways, recesses, and grounds contiguous to all buildings. The lighting system shall be so designed as to limit light spill beyond property lines and to shield the light source from view from off site. (POLICE)
101 VIDEO SURVEILLANCE STANDARDS – The applicant shall install and operate for the life of the Project a video surveillance system subject to the following requirements:
(A) The information shall be maintained and retrievable for a minimum of 30 days.
The captured video material shall be accessible to investigating police personnel 361 of 786
PA-2025-039, 616 S B ST., SPAR+SDPA+ TENTATIVE PARCEL MAP As approved on _______________
through some form of facility management during regular business hours. The applicant shall provide proof of registration of the video surveillance camera system with the City through the City’s Neighborhood Eyes Security Team web form (https://www.cityofsanmateo.org/forms.aspx?FID=134). (B) Cameras shall be placed and maintained to view common areas of the property accessible to the public such as lobbies, parking lots, parking garages and entrances and exits to all parking garages, gates dividing different uses inside mixed-use parking garages, driveways, circulation areas, aisles, passageways, recesses, and grounds contiguous to all buildings. This condition is not intended to require Applicant to install pole mount cameras on the property, cameras to view these areas may be installed on the building facing out.
(C) The cameras in this system shall be megapixel or better CCTV cameras that shall be capable of operating in all lighting conditions anticipated at Project completion.
Cameras viewing locations intended to allow routine vehicle passage onto the sites and/or garages shall additionally be capable of capturing the front and rear of all entering and exiting vehicles that use the sites and/or garages, and be of sufficient quality to identify the make and model of vehicles accessing the site, clearly read both front and rear license plates of vehicles, and clearly depict faces of occupants through the front windshield. (POLICE)
City Attorney (PA)
102 INDEMNIFICATION – The applicant will defend, indemnify, and hold harmless the City of San Mateo, its elected and appointed officials, employees, and agents from and against any costs, claims, or liabilities arising out of the approval of this planning application, including, without limitation, any award of attorney fees that might result from third party challenge. If applicant is required to defend the City, the City shall retain the right to select the counsel who shall defend the City. (CITY ATTORNEY) 103 PENALTY – In accordance with San Mateo Municipal Code section 27.02.210-Violations of Planning Application Conditions, any violation of any of the conditions of approval is unlawful and will subject the applicant to the penalties set forth in Chapter 1.04-General Penalty of the San Mateo Municipal Code as well as any other available legal remedies. (CITY ATTORNEY)
362 of 786
EXHIBIT B
SUMMARY OF PROJECT CONCESSIONS AND WAIVERS
The following concession has been requested by the applicant, pursuant to State Density Bonus Law:
1. Architectural Style - Objective Design Standards Section 7.1.2 requires new development in the Downtown area be designed in a Spanish Colonial Revival architectural style. The project requests a concession, stating that full adherence to this standard would impose additional costs on the Project.
Waivers to the following standards have been identified by the applicant, pursuant to State Density Bonus Law:
1. Residential Density – The San Mateo General Plan 2040 Land Use Designation for this site is Mixed-Use Medium II, and the maximum base density is 99 dwellings per acre. For this 0.64-acre site, the maximum density is 64 dwellings. The proposed Project would include 94 dwelling units, exceeding the maximum density. However, the Project would reserve 15% of the base density (10 units, or 15% of the General Plan maximum) for Very-Low Income (VLI) households. Per Government Code section 65915(f)(2), a project with at least 15% of the dwellings reserved for VLI households is eligible for a density bonus of 50% of the base density. The 50% bonus applied to this site would increase the maximum allowable density to 94 dwellings.
2. Building Height – San Mateo Municipal Code (SMMC) Section 27.30.055 refers to the General Plan for building height standards. The General Plan Land Use designation for this site of Mixed-Use Medium II includes a maximum building height of six stories. The proposed project seeks a waiver to exceed the maximum height limit by two stories for a total height of eight stories.
3. Setback Requirements – Per SMMC Section 27.30.060, the project would be required to provide a 20- foot setback along 7th Avenue, as well as a 15-foot rear yard setback. The project requests a waiver for reductions to both setbacks.
4. Loading Zone – Per SMMC Section 27.64.390(a)(2), to approve an on-street loading zone, the loading space must be located at least 50 feet from the nearest intersection. The project has identified a waiver to this request, as the loading zone is located less than 50 feet from the nearest intersection. The loading configuration has been reviewed by Public Works staff and determined to be acceptable with the waiver.
5. Architectural Features – Objective Design Standards (ODS) Section 7.1.2.F requires three architectural features (cornices, cornices above second floor awnings, and windowsills) be aligned with these features on adjacent buildings. The project identifies a waiver, as these features are not designed to align with adjacent buildings.
6. Shadows – ODS Section 5.1.2 requires that 50% of the required open space are be unshaded between 12:00 PM and 2:00 PM at spring and fall equinox. The project requests a waiver, as the open space area would be 13% unshaded during these hours, and would require a reduction in the number of residential units to comply with the 50% requirement.
7. Vertical Wall Plane Breaks – ODS Section 4.1.7.B.2 provide a list of four criteria for vertical wall plane breaks, requiring high rise projects to incorporate at least three into the design. The project includes roof cornice and material changes to partially meet this standard, but does not provide a third design feature to fully comply with this standard, requesting a waiver to the section. 363 of 786
LOCATION MAP
PA-2025-039
616 S. B St., Nazareth Vista SPAR + SDPA + Tentative Parcel Map Address: 616 S. B St.
Parcel Number: 034194030, 034194140
Project Site
364 of 786
VICINITY MAP
PROJECT #:
A Planning Application For:
NAZARETH VISTA
606 - 616 South B Street
San Mateo, CA 94401
NAZARETH VISTA
606 - 616 South B Street San Mateo, CA 94401
225684.12
A Planning Application For:
ARC TE
C
ARCHITECTURAL TECHNOLOGIES
Arizona California
2960 E. Northern Avenue1731 Technology Drive Building C Suite 750 Phoenix, AZ 85028 San Jose, CA 95110 602.953.2355 408.496.0696
www.arctecinc.com
82 82
SITE
S EL CAMINO REAL
LAUREL AVE
9TH AVE
ARAGON BLVD
PALM AVE
ROSEWOOD DR
S B STREET
S RAILROAD AVE
S RAILROAD AVE
S B STREET
S RAILROAD AVE
S CLAREMONT ST.
S DELAWARE ST.
S ELDORADO ST.
S FREMONT ST.
S B STREET
S B STREET
E 4TH AVE
E 3RD AVE
E 5TH AVE
SAN MATEO DR
S ELLSWORTH AVE
6TH AVE
7TH AVE
8TH AVE
9TH AVE
7TH AVE
9TH AVE
10TH AVE
S CLAREMONT ST.
10TH AVE
11TH AVE
S DELAWARE ST.
DRAWING INDEX AND ISSUE DATES
COVER SHEET
ARCHITECTURALA0.01 EXTERIOR BUILDING RENDERINGA0.02 EXTERIOR BUILDING RENDERINGA0.03 EXTERIOR BUILDING RENDERINGA0.04 EXTERIOR BUILDING RENDERINGA0.05 EXTERIOR BUILDING RENDERINGA0.06 EXTERIOR BUILDING RENDERINGA0.07 EXTERIOR BUILDING RENDERINGA0.08 EXTERIOR BUILDING RENDERINGA0.09 EXTERIOR BUILDING RENDERINGA0.10 EXTERIOR BUILDING RENDERINGA0.16 NEIGHBORHOOD CONTEXTA0.17 NEIGHBORHOOD CONTEXTA0.21 AREA CALCULATIONSA0.22 AREA CALCULATIONSA0.23 AREA CALCULATIONSA0.24 COMMERCIAL OPEN SPACE AREA DIAGRAM - FIRST LEVELA0.25 USABLE OPEN SPACE DIAGRAMA0.31 BUILDING CODE DATAA0.32 EGRESS DIAGRAMSA0.33 EGRESS DIAGRAMSA1.00 DEMOLITION SITE PLANA1.01 ARCHITECTURAL SITE PLANA1.02 SITE DETAILSA1.11 SOLAR SHADOW STUDYA2.11 FLOOR PLAN - LEVEL 01A2.12 FLOOR PLAN - LEVEL 02A2.13 FLOOR PLAN - LEVEL 03A2.14 FLOOR PLAN - LEVEL 04A2.15 FLOOR PLAN - LEVEL 05A2.16 FLOOR PLAN - LEVEL 06A2.17 FLOOR PLAN - LEVEL 07A2.18 FLOOR PLAN - LEVEL 08A2.31 ROOF PLANA3.11 NORTH ELEVATION & PARTIAL FLOOR PLANSA3.12 EAST ELEVATION & PARTIAL FLOOR PLANSA3.13 SOUTH ELEVATION & PARTIAL FLOOR PLANSA3.14 WEST ELEVATION & PARTIAL FLOOR PLANSA3.15 EXTERIOR ELEVATIONSA3.16 EXTERIOR ELEVATIONSA3.17 EXTERIOR FINISHESA3.18A OBJECTIVE DESIGN STANDARDSA3.18B OBJECTIVE DESIGN STANDARDSA3.19 IMAGERYA3.20 OPENING FIRE SEPARATION DISTANCEA4.11 BUILDING SECTIONSA5.11 ENLARGED UNIT PLANSA5.12 ENLARGED UNIT PLANSA5.13 ENLARGED UNIT PLANSA5.14 ENLARGED UNIT PLANSA5.15 ENLARGED UNIT PLANS CIVIL
C1.0 COVER SHEETC2.0 TOPOGRAPHIC SURVEYC2.1 TOPOGRAPHIC SURVEYC2.2 TENTATIVE PARCEL MAPC3.0 GRADING AND DRAINAGE PLANC3.1 GRADING SECTIONSC4.0 UTILITY PLANC4.1 UTILITY PLANC4.2 UTILITY PLANC4.3 SILVA CELLS LAYOUTC4.4 SILVA CELLS LAYOUTC5.0 STORMWATER MANAGEMENT PLANC5.1 STORMWATER MANAGEMENT DETAILSC5.2 STORMWATER MANAGEMENT DETAILSC6.0 EROSION CONTROL PLANC6.1 EROSION CONTROL DETAILSC6.2 COUNTY BMP SHEETC7.0 FIRE ACCESS PLANC8.0 SIGNING AND STRIPINGC9.0 TRUCK TURNING MOVEMENTSC9.1 TRUCK TURNING MOVEMENTS
LANDSCAPE
L0.1 PRELIMINARY SITE PLANL0.2 PRELIMINARY 4TH FLOOR PLANL0.3 TREE DISPOSITION AND PLANT IMAGES
PHOTOMETRIC
PM-2 PROPOSED PHOTOMETRIC EXHIBIT
TRASH MANAGEMENT
T0.1 FLOOR PLAN - LEVEL 01T0.2 FLOOR PLAN - LEVEL 03T0.3 FLOOR PLAN - LEVEL 04T1.0 TRASH COLLECTION AREA
ISSUE DATES AND DESCRIPTIONS
03.26.2025
SB330 APPLICATION
04.30.2025
1ST PLANNING SUBMITTAL
08.11.2025
2ND PLANNING SUBMITTAL
12.16.2025
3RD PLANNING SUBMITTAL
03.26.2026
4TH PLANNING SUBMITTAL
PRELIMINARY OR PRICING PLANS
FIRST FORMAL SUBMITTAL OR NO CHANGES
SINCE PREVIOUS ISSUE
MODIFICATIONS SINCE PREVIOUS ISSUE
2025 CALIFORNIA BUILDING CODE (CCR TITLE 24, PART 2)2025 CALIFORNIA ELECTRIC CODE (CCR TITLE 24, PART 3)2025 CALIFORNIA MECHANICAL CODE (CCR TITLE 24, PART 4)2025 CALIFORNIA PLUMBING CODE (CCR TITLE 24, PART 5)2025 CALIFORNIA ENERGY CODE (CCR TITLE 24, PART 6)2025 CALIFORNIA FIRE CODE (CCR TITLE 24, PART 9)2025 CALIFORNIA GREEN BUILDING STANDARDS CODE (CCR TITLE 24, PART 11)
ALL CODES ARE SUBJECT TO LOCAL GOVERNMENT AMENDMENTS PER CALIFORNIA BUILDING STANDARDS COMMISSION BULLETIN 10-03.
APPLICABLE CODES
PROJECT TEAM
OWNER NAME:PROJECT ADDRESS:
BUILDING AREA:NUMBER OF STORIES:CONSTRUCTION TYPE:FIRE SPRINKLERS:TOTAL RESIDENTIAL UNITS:OCCUPANCY TYPE:
PROJECT DATA
NAZARETH VISTA LLC
606-616 S. B STREET
SAN MATEO, CA 94401
162,119 S.F.
8 SEE BELOW
YES
M, S-2 & R-2
94 UNITS
LEVEL 4 TRU LEVEL 8 - CONSTRUCTION TYPE I-B (RESIDENTIAL R-2)/ STEEL STUD FRAMINGLEVEL 3 - CONSTRUCTION TYPE I-A (PARKING S-2)/ CONCRETE STRUCTURELEVEL 2 - CONSTRUCTION TYPE I-A (PARKING S-2)/ CONCRETE STRUCTURELEVEL 1 - CONSTRUCTION TYPE I-A (RETAIL M)/ CONCRETE STRUCTURE BUILDING TOP OF PLATE: 84'-10"
CONSTRUCTION TYPES
Occupancy Group(s) S1/ M & R-2
Type of Construction I-A (levels 01, 02 & 03) & I-B (level 04 to level 08) Lot Size (Sq. Ft.) 27,921Permitted Floor Area Ratio 4.0Maximum Permitted Floor Area (Sq. Ft.) 111,684 Existing Proposed Occupancy Group
Floor Area (Sq. Ft.) 0
Main Structure(s) 0
Level 01 0 25,158 S1/ M
Level 02 0 24,459 S1Level 03 0 24,459 S1Level 04 0 18,147 R-2Level 05 0 18,147 R-2Level 06 0 18,147 R-2Level 07 0 18,147 R-2Level 08 0 15,455 R-2 Detached Accessory Structures 0 0 N/A
Total Floor Area (Sq. Ft.) 162,119
Proposed Building Height 84'-10"Number of Stories 8
Ratio
Proposed Number of Residential Units (Studio) 42 45%Proposed Number of Residential Units (1-bedroom) 41 43%Proposed Number of Residential Units (2-bedroom) 11 12% Total Proposed Number of Residential Units 94
Proposed Number of BMR Units (Studio - Very Low Income) 6Proposed Number of BMR Units (1-bedroom - Very Low Income) 3Proposed Number of BMR Units (2-bedroom - Very Low Income) 1Proposed Total Number of BMR Units (Very Low Income) 10 Existing interior Floor Area to be remodeled 0
Total Floor Area for Parking Requirements 61,206Total Covered Parking Stalls 114Total Uncovered Parking Stalls 0Total Area of new and rehabilitated landscape area (sq. ft.) Cubic Yard of Soil Disturbance 450
PROJECT DATA:
Residential Units
Unit Type Unit Area (S.F.) Balcony Area (S.F.) Unit Area w/Balcony (S.F.) # Unit Level 4 # Unit Level 5 # Unit Level 6 # Unit Level 7 # Unit Level 8 Total # Units Density Bonus Parking Req'd Short-Term Bike Pkg Req'd Long-Term Bike Pkg Req'd Total Unit Area Total Balcony Area Unit Mix A1.0 (Studio) 541 0 541 0 3 3 3 3 12 0.50 0.05 1.00 6,492 0 45%
A1.1 (Studio) 660 0 660 0 1 1 1 0 3 0.50 0.05 1.00 1,980 0A1.2 (Studio) 653 0 653 1 1 1 1 0 4 0.50 0.05 1.00 2,612 0A1.2A (Studio) 553 92 645 0 1 1 1 0 3 0.50 0.05 1.00 1659 276A1.3 (Studio) 468 0 468 3 3 3 3 0 12 0.50 0.05 1.00 5,616 0A1.4 (Studio) 517 0 517 1 1 1 1 0 4 0.50 0.05 1.00 2,068 0A1.5 (Studio) 507 152 659 0 0 0 0 1 1 0.50 0.05 1.00 507 152A1.6 (Studio) 442 92 534 0 0 0 0 1 1 0.50 0.05 1.00 442 92A1.6A (Studio) 481 96 577 0 0 0 0 1 1 0.50 0.05 1.00 481 96A1.7 (Studio) 370 0 370 0 0 0 0 1 1 0.50 0.05 1.00 370 0 B1.0 (1BR/1BA Unit) 820 74 894 1 2 2 2 2 9 0.50 0.05 1.00 7,380 666 42%
B1.1 (1BR/1BA Unit) 800 74 874 1 1 1 1 1 5 0.50 0.05 1.00 4,000 370B1.2 (1BR/1BA Unit) 894 148 1,042 1 1 1 1 0 4 0.50 0.05 1.00 3,576 592B1.3 (1BR/1BA Unit) 747 74 821 3 3 3 3 0 12 0.50 0.05 1.00 8964 888B1.4 (1BR/1BA Unit) 832 88 920 1 1 1 1 0 4 0.50 0.05 1.00 3328 352B1.5 (1BR/1BA Unit) 976 627 1603 0 0 0 0 1 1 0.50 0.05 1.00 976 627B1.6 (1BR/1BA Unit) 622 195 817 0 0 0 0 3 3 0.50 0.05 1.00 1866 585B1.7 (1BR/1BA Unit) 670 220 890 0 0 0 0 1 1 0.50 0.05 1.00 670 220B1.8 (1BR/1BA Unit) 623 260 883 0 0 0 0 1 1 0.50 0.05 1.00 623 260B1.9 (1BR/1BA Unit) 713 611 1324 0 0 0 0 1 1 0.50 0.05 1.00 713 611 C1.0 (2BR/2BA Unit) 1308 0 1,308 1 1 1 1 0 4 0.50 0.10 1.25 5,232 0 13%
C1.1 (2BR/2BA Unit) 1,400 58 1,458 1 1 1 1 0 4 0.50 0.10 1.25 5,600 232C1.2 (2BR/2BA Unit) 1,118 277 1,395 0 0 0 0 1 1 0.50 0.10 1.25 1,118 277C1.3 (2BR/1BA Unit) 1,223 92 1,315 1 0 0 0 0 1 0.50 0.10 1.25 1223 92C1.4 (2BR/2BA Unit) 1,240 74 1314 1 0 0 0 0 1 0.50 0.10 1.25 1240 74 Total # dwelling units 16 20 20 20 18 94 67,495 6,553
Floor Area
(per General
Plan 2040)
Use Level 1 Level 2 Level 3 Level 4 Level 5 Level 6 Level 7 Level 8 Total Area Project FAR Retail Area 7,286 7,286Parking garage 12,288 12,288
Total FAR Floor Area 19,574 0.70
Open Space
Private Residential Open Space (Level 4/ Level 5/ Level 6/ Level 7 & Level 8) (S.F.) - Provided 6,553 Common Residential Open Space at Level 4 (S.F.) - Provided 5,378 Total open space private + common (residential) - Provided 11,931 Parking Provided
Use Short-Term Bike Long-Term Bike Bike Total Standard Compact Standard
(Tandem)/ Level
2 EV Ready
Compact
(Tandem)/ Level
2 EV Ready
Standard
Accessible
Standard
Accessible Level
2 EVCS
Van Accessible Van Accessible Level 2 EVCS Standard Level 2 EV Capable Standard Level 2 EVCS Standard Level 2 EV Ready Compact Level 2 EVCS Compact Level 2 EV Ready Parking Provided Level 1 - Retail/ Visitors 4 1 7 8 5 1 1 1 4 1 21Level 1 - Residential 6 6Level 2 - Residential 1 1 1 1 4 22 4 12 46Level 3 - Residential 97 97 1 1 1 1 27 4 12 47 Total Parking Provided 10 98 114
BMR UNIT REQUIREMENTS - PER SDB ON BASE DENSITY (63 UNITS) 50% INCREASE: 15% VERY LOW INCOME 10 UNITS
BMR UNIT BREAKDOWN
# VLI
(VERY LOW INCOME)
UNITS
UNIT TYPE
STUDIO
LOCATION
LEVEL 04 1
# LI
( LOW INCOME)
UNITS
0 # MOD
( MODERATE INCOME)
UNITS
0 TAG
A1.2
1BED/1BA B1.3 LEVEL 04 1 0 0
2BED/2BA C1.4 LEVEL 04 1 0 0
STUDIO A1.3 LEVEL 05 1 0 0
1BED/1BA B1.1 LEVEL 05 1 0 0
STUDIO A1.0 LEVEL 06 1 0 0
1BED/1BA B1.3 LEVEL 06 1 0 0
STUDIO A1.0 LEVEL 07 1 0 0STUDIO A1.2 LEVEL 07 1 0 0
653
AREA
(S.F.)
747
1,240
468800
541
747
541
653
TOTAL BMR UNITS 10 0 0
TOTAL BMR
UNITS
111111111
% BMR
UNITS
10%10%10%10%10%10%10%10%10%
1BED/1BA B1.1 800 LEVEL 07 1 0 0 1 10%
PHONE:CONTACT:EMAIL:
LANDSCAPEARCHITECT:
KLA INC.151 N. Norlin StreetSonora, CA 95370
209.743.0278Tom [email protected]
PHONE:CONTACT:EMAIL:
ARCHITECT: ARC TEC INC.
1731 Technology Drive, Suite 750San Jose, CA 95110
408.496.0676Evan [email protected]
PHONE:CONTACT:EMAIL:
CIVILENGINEER:
SANDIS1700 S. Winchester Boulevard, Suite 200Campbell, CA 95008 408.636.0981Nate [email protected]
PHONE:CONTACT:EMAIL:
OWNER: NAZARETH VISTA LLC
800 S B Street, Suite 100San Mateo, CA 94401
650.347.9500 Ext. 101Mounir [email protected]
PROJECT DESCRIPTION
GENERAL DESCRIPTION
THIS PROJECT INVOLVES THE DEVELOPMENT OF A NEW 162,119 -SQUARE-FOOT, EIGHT-STORY BUILDING INCLUDING FIVE-STORIES OF RESIDENTIAL FLOORS OVER TWO STORIES OF PARKING ON AN 27,921-SQUARE-FOOT LOT. THEBUILDING WILL INCLUDE A 7,286-SQUARE-FOOT COMMERCIAL SPACE AT THE GROUND FLOOR, ABOVE GRADE VISITOR/ RETAIL & RESIDENTIAL PARKING GARAGE AT LEVEL 02 AND 03, CONTRIBUTING TO THE ACTIVATION OF THE STREETSCAPE AND ENHANCING NEIGHBORHOOD AMENITIES. THE SCOPE OF WORK ENCOMPASSES THE CORE ANDSHELL CONSTRUCTION OF THE BUILDING, PROVIDING A STRUCTURAL FRAMEWORK FOR FUTURE RESIDENTIAL ANDCOMMERCIAL TENANTS.
ADDITIONALLY, THE PROJECT INCLUDES SITE IMPROVEMENTS TO ENHANCE PEDESTRIAN AND BICYCLEACCESSIBILITY, SUCH AS NEW SIDEWALKS, CURB AND GUTTER ENHANCEMENTS, RAISED PLANTERS, BICYCLE RACKS, AND STREET TREES.EXISTING COMMERCIAL STRUCTURES ARE PROPOSED TO BE DEMOLISHED. LOT MERGER PROCESS WILL BE USED TO COMBINED SUBJECT PROPERTIES WITH RESPECTED APN 034194030 & 034194140 INTO ONE (1) PARCEL.
THE PROJECT PROPOSES TO DISTURBED APPROXIMATELY 450 CY (330 CY CUT AND 120 CY FILL) OF SOIL TO CONSTRUCT THIS PROJECT.PROJECT TYPE AND TENURE
THE DEVELOPMENT WILL CONSIST OF APARTMENT-STYLE UNITS INTENDED FOR RENT. THIS MODEL PROMOTES
OPPORTUNITIES FOR RESIDENTS AND ALIGNS WITH THE CITY'S OBJECTIVES TO DIVERSIFY HOUSING OPTIONS
AFFORDABLE HOUSING UNITS
THE PROPOSED DEVELOPMENT PROPOSES A TOTAL OF NINETY-FOUR (94) RENTAL DWELLING UNITS AND INCLUDES 15% OF UNITS DESIGNATED AS AFFORDABLE HOUSING OR (10) TEN VERY- LOW INCOME UNITS.
PARKING
THE PROPOSED DEVELOPMENT PROPOSES A TOTAL OF ONE HUNDRED - SEVENTEEN (114) PARKING SPACES INCLUDING ELEVEN (21) PARKING STALLS FOR VISITORS/ RETAIL AND (93) PARKING STALLS FOR RESIDENT USE ONLY. CALIFORNIA ASSEMBLY BILL AB2097 PROHIBITS PUBLIC AGENCIES FROM IMPOSING MINIMUM PARKING
REQUIREMENTS ON RESIDENTIAL/ COMMERCIAL PROJECT LOCATED WITHIN ONE-HALF MILE OF A MAJOR TRANSIT STOP. ADDITIONALLY, NINETY-SEVEN (97) LONG-TERM BIKE RACKS FOR RESIDENT USE AND (1) LONG-TERM BIKE RACK FOR RETAIL USE WILL BE INSTALLED (SECURED STORAGE). A TOTAL OF FOUR (10) SHORT-TERM BIKE RACKS WILL BE PROVIDED FOR RETAIL AND RESIDENT USES.
REQUIRED ENTITLEMENTS
TO PROCEED WITH THE DEVELOPMENT, THE FOLLOWING ENTITLEMENTS ARE REQUESTED: · SITE PLAN AND ARCHITECTURAL REVIEW (SPAR): APPROVAL OF THE PROPOSED SITE LAYOUT AND BUILDING DESIGNS. AS PER SAN MATEO MUNICIPAL CODE §27.08.030, THIS REVIEW ENSURES THAT THE STRUCTURES,
SITE PLAN, AND LANDSCAPING ARE IN SCALE AND HARMONIOUS WITH THE CHARACTER OF THE NEIGHBORHOOD AND MEET ALL APPLICABLE STANDARDS.
· SITE DEVELOPMENT PERMIT (SDP): AUTHORIZATION FOR GRADING, UTILITY INSTALLATION, AND INFRASTRUCTURE IMPROVEMENTS. ACCORDING TO SAN MATEO MUNICIPAL CODE §23.40.030, A SITE DEVELOPMENT PLANNING APPLICATION MUST BE SUBMITTED, FOLLOWED BY THE ISSUANCE OF A SITEDEVELOPMENT PERMIT, TO COMMENCE ANY SITE DEVELOPMENT. · VESTING TENTATIVE MAP (VTM): APPROVAL FOR THE MERGER OF EXISTING LOTS AND ESTABLISHMENT OF CONDOMINIUM UNITS. THIS MAP DEFINES THE BOUNDARIES AND LAYOUT OF THE PROPOSED DEVELOPMENT.
DEVELOPMENT PROJECT DATA INFORMATION
ACCESSOR'S PARCEL NUMBERS: 034-194-030 & 034-194-140
365 of 786
A0.01 RENDERING SCALE: RENDERING - VIEW FROM S. B STREET LOOKING TOWARDS 6TH AVENUEN.T.S. 1 PROJECT NO: DATE DESCRIPTION Q:\2022 Jobs\225684 - Nazareth Vista Mixed-Use\01-Planning App\2025-MMDD 3RD PLANNING SUBMITTAL\225684-A001-A008.dwg - Dec 22, 2025, 1:01pm - josephinek The "user(s)" in possession of this documentation acknowledge(s) that ARC TEC's and ARC TEC consultants' drawings, specifications, reports, electronic data and other documentation are instruments of service. ARC TEC and ARC TEC consultants shall be deemed the author and owner of such documentation. The "user(s)" in possession of this documentation shall not use or authorize any other person to use ARC TEC's or ARC TEC consultants' instruments of service. Reuse without ARC TEC's written authorization will be at the user(s) sole risk and without liability to ARC TEC and ARC TEC's consultants. The user(s) possessing this documentation shall indemnify and hold harmless ARC TEC and ARC TEC's consultants and agents and employees from and against all claims, damages losses and expenses, including but not limited to attorneys' fees, arising out of unauthorized reuse of ARC TEC o r ARC TEC' s c o n s u l t a n t s i n s tr ume n t s o f s e r v i c e . Written dimensions on this drawing shall have precedence over any scaled dimension. DO NOT SCALE THIS DRAWING for accurate dimensions and notify ARC TEC of any discrepancies. © Copyright ARC TEC, Inc. 2021 In Association with: A R C T E C ARCHITECTURAL TECHNOLOGIES www.arctecinc.com Arizona 2960 East Northern Avenue, Building C Phoenix, AZ 85028 602.953.2355 California 1731 Technology Drive, Suite 750 San Jose, CA 95110 408.496.0676 225684.11 A Planning Applicationt For:
NAZARETH VISTA
606 - 616 SOUTH B STREET
SAN MATEO, CA 94401 03.26.2025 SB330 APPLICATION 04.30.2025 1ST PLANNING SUBMITTAL 08.11.2025 2ND PLANNING SUBMITTAL 12.16.2025 3RD PLANNING SUBMITTAL PA-2024-039 12 366 of 786 A0.02 RENDERING SCALE: RENDERING - S. B STREET AND 7TH AVENUE INTERSECTIONN.T.S. 1 PROJECT NO: DATE DESCRIPTION Q:\2022 Jobs\225684 - Nazareth Vista Mixed-Use\01-Planning App\2025-MMDD 3RD PLANNING SUBMITTAL\225684-A001-A008.dwg - Dec 22, 2025, 1:01pm - josephinek The "user(s)" in possession of this documentation acknowledge(s) that ARC TEC's and ARC TEC consultants' drawings, specifications, reports, electronic data and other documentation are instruments of service. ARC TEC and ARC TEC consultants shall be deemed the author and owner of such documentation. The "user(s)" in possession of this documentation shall not use or authorize any other person to use ARC TEC's or ARC TEC consultants' instruments of service. Reuse without ARC TEC's written authorization will be at the user(s) sole risk and without liability to ARC TEC and ARC TEC's consultants. The user(s) possessing this documentation shall indemnify and hold harmless ARC TEC and ARC TEC's consultants and agents and employees from and against all claims, damages losses and expenses, including but not limited to attorneys' fees, arising out of unauthorized reuse of ARC TEC o r ARC TEC' s c o n s u l t a n t s i n s tr ume n t s o f s e r v i c e . Written dimensions on this drawing shall have precedence over any scaled dimension. DO NOT SCALE THIS DRAWING for accurate dimensions and notify ARC TEC of any discrepancies. © Copyright ARC TEC, Inc. 2021 In Association with: A R C T E C ARCHITECTURAL TECHNOLOGIES www.arctecinc.com Arizona 2960 East Northern Avenue, Building C Phoenix, AZ 85028 602.953.2355 California 1731 Technology Drive, Suite 750 San Jose, CA 95110 408.496.0676 225684.11 A Planning Applicationt For:
NAZARETH VISTA
606 - 616 SOUTH B STREET
SAN MATEO, CA 94401 03.26.2025 SB330 APPLICATION 04.30.2025 1ST PLANNING SUBMITTAL 08.11.2025 2ND PLANNING SUBMITTAL 12.16.2025 3RD PLANNING SUBMITTAL PA-2024-039 12 367 of 786 A0.03 RENDERING SCALE: RENDERING - VIEW FROM 6TH AVENUE LOOKING TOWARDS S. B STREETN.T.S. 1 PROJECT NO: DATE DESCRIPTION Q:\2022 Jobs\225684 - Nazareth Vista Mixed-Use\01-Planning App\2025-MMDD 3RD PLANNING SUBMITTAL\225684-A001-A008.dwg - Dec 22, 2025, 1:01pm - josephinek The "user(s)" in possession of this documentation acknowledge(s) that ARC TEC's and ARC TEC consultants' drawings, specifications, reports, electronic data and other documentation are instruments of service. ARC TEC and ARC TEC consultants shall be deemed the author and owner of such documentation. The "user(s)" in possession of this documentation shall not use or authorize any other person to use ARC TEC's or ARC TEC consultants' instruments of service. Reuse without ARC TEC's written authorization will be at the user(s) sole risk and without liability to ARC TEC and ARC TEC's consultants. The user(s) possessing this documentation shall indemnify and hold harmless ARC TEC and ARC TEC's consultants and agents and employees from and against all claims, damages losses and expenses, including but not limited to attorneys' fees, arising out of unauthorized reuse of ARC TEC o r ARC TEC' s c o n s u l t a n t s i n s tr ume n t s o f s e r v i c e . Written dimensions on this drawing shall have precedence over any scaled dimension. DO NOT SCALE THIS DRAWING for accurate dimensions and notify ARC TEC of any discrepancies. © Copyright ARC TEC, Inc. 2021 In Association with: A R C T E C ARCHITECTURAL TECHNOLOGIES www.arctecinc.com Arizona 2960 East Northern Avenue, Building C Phoenix, AZ 85028 602.953.2355 California 1731 Technology Drive, Suite 750 San Jose, CA 95110 408.496.0676 225684.11 A Planning Applicationt For:
NAZARETH VISTA
606 - 616 SOUTH B STREET
SAN MATEO, CA 94401 03.26.2025 SB330 APPLICATION 04.30.2025 1ST PLANNING SUBMITTAL 08.11.2025 2ND PLANNING SUBMITTAL 12.16.2025 3RD PLANNING SUBMITTAL PA-2024-039 12 368 of 786 A0.04 RENDERING SCALE: RENDERING - S. B STREET AND 6TH AVENUE INTERSECTIONN.T.S. 1 PROJECT NO: DATE DESCRIPTION Q:\2022 Jobs\225684 - Nazareth Vista Mixed-Use\01-Planning App\2025-MMDD 3RD PLANNING SUBMITTAL\225684-A001-A008.dwg - Dec 22, 2025, 1:01pm - josephinek The "user(s)" in possession of this documentation acknowledge(s) that ARC TEC's and ARC TEC consultants' drawings, specifications, reports, electronic data and other documentation are instruments of service. ARC TEC and ARC TEC consultants shall be deemed the author and owner of such documentation. The "user(s)" in possession of this documentation shall not use or authorize any other person to use ARC TEC's or ARC TEC consultants' instruments of service. Reuse without ARC TEC's written authorization will be at the user(s) sole risk and without liability to ARC TEC and ARC TEC's consultants. The user(s) possessing this documentation shall indemnify and hold harmless ARC TEC and ARC TEC's consultants and agents and employees from and against all claims, damages losses and expenses, including but not limited to attorneys' fees, arising out of unauthorized reuse of ARC TEC o r ARC TEC' s c o n s u l t a n t s i n s tr ume n t s o f s e r v i c e . Written dimensions on this drawing shall have precedence over any scaled dimension. DO NOT SCALE THIS DRAWING for accurate dimensions and notify ARC TEC of any discrepancies. © Copyright ARC TEC, Inc. 2021 In Association with: A R C T E C ARCHITECTURAL TECHNOLOGIES www.arctecinc.com Arizona 2960 East Northern Avenue, Building C Phoenix, AZ 85028 602.953.2355 California 1731 Technology Drive, Suite 750 San Jose, CA 95110 408.496.0676 225684.11 A Planning Applicationt For:
NAZARETH VISTA
606 - 616 SOUTH B STREET
SAN MATEO, CA 94401 03.26.2025 SB330 APPLICATION 04.30.2025 1ST PLANNING SUBMITTAL 08.11.2025 2ND PLANNING SUBMITTAL 12.16.2025 3RD PLANNING SUBMITTAL PA-2024-039 12 369 of 786 A0.05 RENDERING PROJECT NO: DATE DESCRIPTION
Q:\2022 Jobs\225684 - Nazareth Vista Mixed-Use\01-Planning App\2025-MMDD 3RD PLANNING SUBMITTAL\225684-A001-A008.dwg - Dec 22, 2025, 1:01pm - josephinek The "user(s)" in possession of this documentation acknowledge(s) that ARC TEC's and ARC TEC consultants' drawings, specifications, reports, electronic data and other documentation are instruments of service. ARC TEC and ARC TEC consultants shall be deemed the author and owner of such documentation. The "user(s)" in possession of this documentation shall not use or authorize any other person to use ARC TEC's or ARC TEC consultants' instruments of service. Reuse without ARC TEC's written authorization will be at the user(s) sole risk and without liability to ARC TEC and ARC TEC's consultants. The user(s) possessing this documentation shall indemnify and hold harmless ARC TEC and ARC TEC's consultants and agents and employees from and against all claims, damages losses and expenses, including but not limited to attorneys' fees, arising out of unauthorized reuse of ARC TEC o r ARC TEC' s c o n s u l t a n t s i n s tr ume n t s o f s e r v i c e . Written dimensions on this drawing shall have precedence over any scaled dimension. DO NOT SCALE THIS DRAWING for accurate dimensions and notify ARC TEC of any discrepancies. © Copyright ARC TEC, Inc. 2021 In Association with: A R C T E C ARCHITECTURAL TECHNOLOGIES www.arctecinc.com Arizona 2960 East Northern Avenue, Building C Phoenix, AZ 85028 602.953.2355 California 1731 Technology Drive, Suite 750 San Jose, CA 95110 408.496.0676 225684.11 A Planning Applicationt For:
NAZARETH VISTA
606 - 616 SOUTH B STREET
SAN MATEO, CA 94401 03.26.2025 SB330 APPLICATION 04.30.2025 1ST PLANNING SUBMITTAL 08.11.2025 2ND PLANNING SUBMITTAL 12.16.2025 3RD PLANNING SUBMITTAL PA-2024-039 12 SCALE: RENDERING - VIEW FROM S. B STREET LOOKING TOWARDS 7TH AVENUEN.T.S. 1 370 of 786 A0.06 RENDERING PROJECT NO: DATE DESCRIPTION
Q:\2022 Jobs\225684 - Nazareth Vista Mixed-Use\01-Planning App\2025-MMDD 3RD PLANNING SUBMITTAL\225684-A001-A008.dwg - Dec 22, 2025, 1:01pm - josephinek The "user(s)" in possession of this documentation acknowledge(s) that ARC TEC's and ARC TEC consultants' drawings, specifications, reports, electronic data and other documentation are instruments of service. ARC TEC and ARC TEC consultants shall be deemed the author and owner of such documentation. The "user(s)" in possession of this documentation shall not use or authorize any other person to use ARC TEC's or ARC TEC consultants' instruments of service. Reuse without ARC TEC's written authorization will be at the user(s) sole risk and without liability to ARC TEC and ARC TEC's consultants. The user(s) possessing this documentation shall indemnify and hold harmless ARC TEC and ARC TEC's consultants and agents and employees from and against all claims, damages losses and expenses, including but not limited to attorneys' fees, arising out of unauthorized reuse of ARC TEC o r ARC TEC' s c o n s u l t a n t s i n s tr ume n t s o f s e r v i c e . Written dimensions on this drawing shall have precedence over any scaled dimension. DO NOT SCALE THIS DRAWING for accurate dimensions and notify ARC TEC of any discrepancies. © Copyright ARC TEC, Inc. 2021 In Association with: A R C T E C ARCHITECTURAL TECHNOLOGIES www.arctecinc.com Arizona 2960 East Northern Avenue, Building C Phoenix, AZ 85028 602.953.2355 California 1731 Technology Drive, Suite 750 San Jose, CA 95110 408.496.0676 225684.11 A Planning Applicationt For:
NAZARETH VISTA
606 - 616 SOUTH B STREET
SAN MATEO, CA 94401 03.26.2025 SB330 APPLICATION 04.30.2025 1ST PLANNING SUBMITTAL 08.11.2025 2ND PLANNING SUBMITTAL 12.16.2025 3RD PLANNING SUBMITTAL PA-2024-039 12 SCALE: RENDERING - VIEW FROM 7TH AVENUE LOOKING TOWARDS S. B STREETN.T.S. 1 371 of 786 A0.07 RENDERING PROJECT NO: DATE DESCRIPTION
Q:\2022 Jobs\225684 - Nazareth Vista Mixed-Use\01-Planning App\2025-MMDD 3RD PLANNING SUBMITTAL\225684-A001-A008.dwg - Dec 22, 2025, 1:01pm - josephinek The "user(s)" in possession of this documentation acknowledge(s) that ARC TEC's and ARC TEC consultants' drawings, specifications, reports, electronic data and other documentation are instruments of service. ARC TEC and ARC TEC consultants shall be deemed the author and owner of such documentation. The "user(s)" in possession of this documentation shall not use or authorize any other person to use ARC TEC's or ARC TEC consultants' instruments of service. Reuse without ARC TEC's written authorization will be at the user(s) sole risk and without liability to ARC TEC and ARC TEC's consultants. The user(s) possessing this documentation shall indemnify and hold harmless ARC TEC and ARC TEC's consultants and agents and employees from and against all claims, damages losses and expenses, including but not limited to attorneys' fees, arising out of unauthorized reuse of ARC TEC o r ARC TEC' s c o n s u l t a n t s i n s tr ume n t s o f s e r v i c e . Written dimensions on this drawing shall have precedence over any scaled dimension. DO NOT SCALE THIS DRAWING for accurate dimensions and notify ARC TEC of any discrepancies. © Copyright ARC TEC, Inc. 2021 In Association with: A R C T E C ARCHITECTURAL TECHNOLOGIES www.arctecinc.com Arizona 2960 East Northern Avenue, Building C Phoenix, AZ 85028 602.953.2355 California 1731 Technology Drive, Suite 750 San Jose, CA 95110 408.496.0676 225684.11 A Planning Applicationt For:
NAZARETH VISTA
606 - 616 SOUTH B STREET
SAN MATEO, CA 94401 03.26.2025 SB330 APPLICATION 04.30.2025 1ST PLANNING SUBMITTAL 08.11.2025 2ND PLANNING SUBMITTAL 12.16.2025 3RD PLANNING SUBMITTAL PA-2024-039 12 SCALE: RENDERING - VIEW FROM THE 4TH FLOOR - RESIDENTIAL COMMON AREAN.T.S. 1 372 of 786 A0.08 RENDERING PROJECT NO: DATE DESCRIPTION
Q:\2022 Jobs\225684 - Nazareth Vista Mixed-Use\01-Planning App\2025-MMDD 3RD PLANNING SUBMITTAL\225684-A001-A008.dwg - Dec 22, 2025, 1:01pm - josephinek The "user(s)" in possession of this documentation acknowledge(s) that ARC TEC's and ARC TEC consultants' drawings, specifications, reports, electronic data and other documentation are instruments of service. ARC TEC and ARC TEC consultants shall be deemed the author and owner of such documentation. The "user(s)" in possession of this documentation shall not use or authorize any other person to use ARC TEC's or ARC TEC consultants' instruments of service. Reuse without ARC TEC's written authorization will be at the user(s) sole risk and without liability to ARC TEC and ARC TEC's consultants. The user(s) possessing this documentation shall indemnify and hold harmless ARC TEC and ARC TEC's consultants and agents and employees from and against all claims, damages losses and expenses, including but not limited to attorneys' fees, arising out of unauthorized reuse of ARC TEC o r ARC TEC' s c o n s u l t a n t s i n s tr ume n t s o f s e r v i c e . Written dimensions on this drawing shall have precedence over any scaled dimension. DO NOT SCALE THIS DRAWING for accurate dimensions and notify ARC TEC of any discrepancies. © Copyright ARC TEC, Inc. 2021 In Association with: A R C T E C ARCHITECTURAL TECHNOLOGIES www.arctecinc.com Arizona 2960 East Northern Avenue, Building C Phoenix, AZ 85028 602.953.2355 California 1731 Technology Drive, Suite 750 San Jose, CA 95110 408.496.0676 225684.11 A Planning Applicationt For:
NAZARETH VISTA
606 - 616 SOUTH B STREET
SAN MATEO, CA 94401 03.26.2025 SB330 APPLICATION 04.30.2025 1ST PLANNING SUBMITTAL 08.11.2025 2ND PLANNING SUBMITTAL 12.16.2025 3RD PLANNING SUBMITTAL PA-2024-039 12 SCALE: RENDERING - VIEW FROM THE 4TH FLOOR - RESIDENTIAL COMMON AREAN.T.S. 1 373 of 786 A0.09 RENDERING PROJECT NO: DATE DESCRIPTION
Q:\2022 Jobs\225684 - Nazareth Vista Mixed-Use\01-Planning App\2025-MMDD 3RD PLANNING SUBMITTAL\225684-A001-A008.dwg - Dec 22, 2025, 1:02pm - josephinek The "user(s)" in possession of this documentation acknowledge(s) that ARC TEC's and ARC TEC consultants' drawings, specifications, reports, electronic data and other documentation are instruments of service. ARC TEC and ARC TEC consultants shall be deemed the author and owner of such documentation. The "user(s)" in possession of this documentation shall not use or authorize any other person to use ARC TEC's or ARC TEC consultants' instruments of service. Reuse without ARC TEC's written authorization will be at the user(s) sole risk and without liability to ARC TEC and ARC TEC's consultants. The user(s) possessing this documentation shall indemnify and hold harmless ARC TEC and ARC TEC's consultants and agents and employees from and against all claims, damages losses and expenses, including but not limited to attorneys' fees, arising out of unauthorized reuse of ARC TEC o r ARC TEC' s c o n s u l t a n t s i n s tr ume n t s o f s e r v i c e . Written dimensions on this drawing shall have precedence over any scaled dimension. DO NOT SCALE THIS DRAWING for accurate dimensions and notify ARC TEC of any discrepancies. © Copyright ARC TEC, Inc. 2021 In Association with: A R C T E C ARCHITECTURAL TECHNOLOGIES www.arctecinc.com Arizona 2960 East Northern Avenue, Building C Phoenix, AZ 85028 602.953.2355 California 1731 Technology Drive, Suite 750 San Jose, CA 95110 408.496.0676 225684.11 A Planning Applicationt For:
NAZARETH VISTA
606 - 616 SOUTH B STREET
SAN MATEO, CA 94401 03.26.2025 SB330 APPLICATION 04.30.2025 1ST PLANNING SUBMITTAL 08.11.2025 2ND PLANNING SUBMITTAL 12.16.2025 3RD PLANNING SUBMITTAL PA-2024-039 12 SCALE: RENDERING - VIEW FROM THE 4TH FLOOR - RESIDENTIAL COMMON AREAN.T.S. 1 374 of 786 A0.10 RENDERING PROJECT NO: DATE DESCRIPTION
Q:\2022 Jobs\225684 - Nazareth Vista Mixed-Use\01-Planning App\2025-MMDD 3RD PLANNING SUBMITTAL\225684-A001-A008.dwg - Dec 22, 2025, 1:02pm - josephinek The "user(s)" in possession of this documentation acknowledge(s) that ARC TEC's and ARC TEC consultants' drawings, specifications, reports, electronic data and other documentation are instruments of service. ARC TEC and ARC TEC consultants shall be deemed the author and owner of such documentation. The "user(s)" in possession of this documentation shall not use or authorize any other person to use ARC TEC's or ARC TEC consultants' instruments of service. Reuse without ARC TEC's written authorization will be at the user(s) sole risk and without liability to ARC TEC and ARC TEC's consultants. The user(s) possessing this documentation shall indemnify and hold harmless ARC TEC and ARC TEC's consultants and agents and employees from and against all claims, damages losses and expenses, including but not limited to attorneys' fees, arising out of unauthorized reuse of ARC TEC o r ARC TEC' s c o n s u l t a n t s i n s tr ume n t s o f s e r v i c e . Written dimensions on this drawing shall have precedence over any scaled dimension. DO NOT SCALE THIS DRAWING for accurate dimensions and notify ARC TEC of any discrepancies. © Copyright ARC TEC, Inc. 2021 In Association with: A R C T E C ARCHITECTURAL TECHNOLOGIES www.arctecinc.com Arizona 2960 East Northern Avenue, Building C Phoenix, AZ 85028 602.953.2355 California 1731 Technology Drive, Suite 750 San Jose, CA 95110 408.496.0676 225684.11 A Planning Applicationt For:
NAZARETH VISTA
606 - 616 SOUTH B STREET
SAN MATEO, CA 94401 03.26.2025 SB330 APPLICATION 04.30.2025 1ST PLANNING SUBMITTAL 08.11.2025 2ND PLANNING SUBMITTAL 12.16.2025 3RD PLANNING SUBMITTAL PA-2024-039 12 SCALE: RENDERING - BIRD'S-EYE-VIEW FROM 7TH STREETN.T.S. 1 375 of 786 6 2 7 3 8 4 1 COMMERCIAL RESIDENCE RESIDENCE RESIDENCE 910 5 RESIDENCE/ COMMERCIAL COMMERCIAL COMMERCIAL RESIDENCE RESIDENCE RESIDENCE RESIDENCE RESIDENCE RESIDENCE COMMERCIAL COMMERCIAL COMMERCIAL COMMERCIAL COMMERCIAL COMMERCIAL COMMERCIAL COMMERCIAL COMMERCIAL COMMERCIAL COMMERCIAL RESIDENCE RESIDENCE RESIDENCE RESIDENCE COMMERCIAL SOUTH B STREET 7TH AVENUE
6TH AVENUE 18'-6" 18'-0" PROJECT NO: DATE DESCRIPTION
Q:\2022 Jobs\225684 - Nazareth Vista Mixed-Use\01-Planning App\2025-MMDD 3RD PLANNING SUBMITTAL\225684-A016.dwg - Dec 22, 2025, 1:02pm - josephinek The "user(s)" in possession of this documentation acknowledge(s) that ARC TEC's and ARC TEC consultants' drawings, specifications, reports, electronic data and other documentation are instruments of service. ARC TEC and ARC TEC consultants shall be deemed the author and owner of such documentation. The "user(s)" in possession of this documentation shall not use or authorize any other person to use ARC TEC's or ARC TEC consultants' instruments of service. Reuse without ARC TEC's written authorization will be at the user(s) sole risk and without liability to ARC TEC and ARC TEC's consultants. The user(s) possessing this documentation shall indemnify and hold harmless ARC TEC and ARC TEC's consultants and agents and employees from and against all claims, damages losses and expenses, including but not limited to attorneys' fees, arising out of unauthorized reuse of ARC TEC o r ARC TEC' s c o n s u l t a n t s i n s tr ume n t s o f s e r v i c e . Written dimensions on this drawing shall have precedence over any scaled dimension. DO NOT SCALE THIS DRAWING for accurate dimensions and notify ARC TEC of any discrepancies. © Copyright ARC TEC, Inc. 2021 In Association with: A R C T E C ARCHITECTURAL TECHNOLOGIES www.arctecinc.com Arizona 2960 East Northern Avenue, Building C Phoenix, AZ 85028 602.953.2355 California 1731 Technology Drive, Suite 750 San Jose, CA 95110 408.496.0676 225684.11 A Planning Applicationt For:
NAZARETH VISTA
606 - 616 SOUTH B STREET
SAN MATEO, CA 94401 03.26.2025 SB330 APPLICATION 04.30.2025 1ST PLANNING SUBMITTAL 08.11.2025 2ND PLANNING SUBMITTAL 12.16.2025 3RD PLANNING SUBMITTAL PA-2024-039 12 SCALE: REFERENCE SITE PLANN.T.S 2 RESIDENCE BUILDING COMMERCIAL 1 4 COMMERCIAL RESIDENCE BUILDING 3 6 RESIDENCE BUILDING COMMERCIAL 5 8 COMMERCIAL COMMERCIAL / RESIDENTIAL BUILDING 7 COMMERCIAL / RESIDENTIAL BUILDING 9 RESIDENTIAL 10 A0.16 NEIGHBORHOOD CONTEXT 376 of 786
COMMERCIAL RESIDENCE RESIDENCE RESIDENCE RESIDENCE/ COMMERCIAL COMMERCIAL COMMERCIAL RESIDENCE RESIDENCE RESIDENCE RESIDENCE RESIDENCE RESIDENCE COMMERCIAL COMMERCIAL COMMERCIAL COMMERCIAL COMMERCIAL COMMERCIAL COMMERCIAL COMMERCIAL COMMERCIAL COMMERCIAL COMMERCIAL RESIDENCE RESIDENCE RESIDENCE RESIDENCE COMMERCIAL SOUTH B STREET 7TH AVENUE
6TH AVENUE 1 234 5 6 7 8 109 EXTG. BLDG 18'-6" EXTG. BLDG 18'-0" PROJECT NO: DATE DESCRIPTION Q:\2022 Jobs\225684 - Nazareth Vista Mixed-Use\01-Planning App\2025-MMDD 3RD PLANNING SUBMITTAL\225684-A016.dwg - Dec 22, 2025, 1:02pm - josephinek The "user(s)" in possession of this documentation acknowledge(s) that ARC TEC's and ARC TEC consultants' drawings, specifications, reports, electronic data and other documentation are instruments of service. ARC TEC and ARC TEC consultants shall be deemed the author and owner of such documentation. The "user(s)" in possession of this documentation shall not use or authorize any other person to use ARC TEC's or ARC TEC consultants' instruments of service. Reuse without ARC TEC's written authorization will be at the user(s) sole risk and without liability to ARC TEC and ARC TEC's consultants. The user(s) possessing this documentation shall indemnify and hold harmless ARC TEC and ARC TEC's consultants and agents and employees from and against all claims, damages losses and expenses, including but not limited to attorneys' fees, arising out of unauthorized reuse of ARC TEC o r ARC TEC' s c o n s u l t a n t s i n s tr ume n t s o f s e r v i c e . Written dimensions on this drawing shall have precedence over any scaled dimension. DO NOT SCALE THIS DRAWING for accurate dimensions and notify ARC TEC of any discrepancies. © Copyright ARC TEC, Inc. 2021 In Association with: A R C T E C ARCHITECTURAL TECHNOLOGIES www.arctecinc.com Arizona 2960 East Northern Avenue, Building C Phoenix, AZ 85028 602.953.2355 California 1731 Technology Drive, Suite 750 San Jose, CA 95110 408.496.0676 225684.11 A Planning Applicationt For:
NAZARETH VISTA
606 - 616 SOUTH B STREET
SAN MATEO, CA 94401 03.26.2025 SB330 APPLICATION 04.30.2025 1ST PLANNING SUBMITTAL 08.11.2025 2ND PLANNING SUBMITTAL 12.16.2025 3RD PLANNING SUBMITTAL PA-2024-039 12 SCALE: REFERENCE SITE PLANN.T.S 2 RESIDENCE BUILDING COMMERCIAL 1 4 COMMERCIAL RESIDENCE BUILDING 3 6 RESIDENCE BUILDING COMMERCIAL 5 8 COMMERCIAL COMMERCIAL / RESIDENTIAL BUILDING 7 COMMERCIAL / RESIDENTIAL BUILDING 9 RESIDENTIAL 10 A0.17 NEIGHBORHOOD CONTEXT 377 of 786 NO PARKING NO PARKING UP 20% VAN EV CAPABLE COMPACT COMPACT COMPACT COMPACT TURN AROUND UP EV CAPABLE LEVEL 2 EVCS VAN ACCESSIBLE UP 10% EV CAPABLE EV CAPABLE DN 6.0% DN 5.0% DN
5.0% DN 5.0% COMPACT COMPACT UP RETAIL AREA 7,286 SF PARKING AREA 12,288 SF RETAIL AREA PARKING AREA LEVEL 01 RETAIL SPACE 7,286 SQ. FT. VISITOR/ RETAIL PARKING (INCLUDING RAMP) 12,288 SQ. FT. TOTAL: 19,674 SQ. FT. TOTAL FLOOR AREA: 19,674 SQ. FT. FAR FLOOR AREA CALCULATIONS (PER GENERAL PLAN 2040 REQUIREMENTS) TOTAL FAR FLOOR AREA: 19,674 SQ.FT. FIRST LEVEL RETAIL SPACE 7,286 SQ. FT. TOTAL: 7,286 SQ. FT. PARKING ORDINANCE AREA CALCULATIONS FAR AREA DESIGNATION BICYCLE PARKING ANALYSIS (PER CITY OF SAN MATEO MUNICIPAL CODE SECTION 27.64.262 REQUIRED SHORT-TERM (RESIDENTIAL) STUDIO AND ONE-BEDROOM UNIT @ 0.05 SPACES PER UNIT 83 UNITS x 0.05 = 4.65 SPACES TWO-BEDROOM UNIT @ 0.1 SPACES PER UNIT 11 UNITS x 0.1 = 1.1 SPACE TOTAL REQUIRED SHORT-TERM (RESIDENTIAL): 5.75 SPACES OR 6 SPACES REQUIRED LONG-TERM (RESIDENTIAL) STUDIO AND ONE-BEDROOM UNIT @ 1.0 SPACE PER UNIT 83 UNITS x 1.0 = 83 SPACES TWO-BEDROOM UNIT @ 1.25 SPACES PER UNIT 11 UNITS x 1.25 = 13.75 SPACES TOTAL REQUIRED LONG-TERM (RESIDENTIAL): 96.75 SPACES OR 97 SPACES REQUIRED SHORT-TERM (RETAIL) 1 PER 2,000 S.F. OF RETAIL SPACE 7,286 S.F. / 2,000 = 3.64 SPACES OR 4 SPACES REQUIRED LONG-TERM (RETAIL) 1 PER 12,000 S.F. OF RETAIL SPACE 7,286 S.F. / 12,000 = 0.60 SPACES OR 1 SPACE PROVIDED SHORT-TERM BIKE (RESIDENTIAL): 6 SPACES (REFER TO SHEET A1.01 FOR LOCATION) PROVIDED SHORT-TERM BIKE SPACES (RETAIL): 4 SPACES (REFER TO SHEET A1.01 FOR LOCATION) PROVIDED LONG-TERM BIKE SPACES (RESIDENTIAL): 97 SPACES (REFER TO SHEET A2.13 FOR LOCATION) PROVIDED LONG-TERM BIKE SPACES (RETAIL): 1 SPACE (REFER TO SHEET A1.01 FOR LOCATION) PROJECT NO: DATE DESCRIPTION Q:\2022 Jobs\225684 - Nazareth Vista Mixed-Use\01-Planning App\2025-MMDD 3RD PLANNING SUBMITTAL\225684-A021_A023.dwg - Dec 22, 2025, 1:02pm - josephinek The "user(s)" in possession of this documentation acknowledge(s) that ARC TEC's and ARC TEC consultants' drawings, specifications, reports, electronic data and other documentation are instruments of service. ARC TECand ARC TEC consultants shall be deemed the author and owner of suchdocumentation. The "user(s)" in possession of this documentation shall not use or authorize any other person to use ARC TEC's or ARC TEC consultants' instruments of service. Reuse without ARC TEC's written authorization will beat the user(s) sole risk and without liability to ARC TEC and ARC TEC's consultants. The user(s) possessing this documentation shall indemnify and hold harmless ARC TEC and ARC TEC's consultants and agents and employees from and against all claims, damages losses and expenses, including but not limited to attorneys' fees, arising out of unauthorized reuse of ARC TEC o r ARC TEC' s c o n s u l t a n t s i n s tr ume n t s o f s e r v i c e . Written dimensions on this drawing shall have precedence over any scaled dimension. DO NOT SCALE THIS DRAWING for accurate dimensions and notify ARC TEC of any discrepancies. © Copyright ARC TEC, Inc. 2021 In Association with: A R C T E C ARCHITECTURAL TECHNOLOGIES www.arctecinc.com Arizona 2960 East Northern Avenue, Building C Phoenix, AZ 85028 602.953.2355 California 1731 Technology Drive, Suite 750 San Jose, CA 95110 408.496.0676 225684.11 A Planning Applicationt For:
NAZARETH VISTA
606 - 616 SOUTH B STREET
SAN MATEO, CA 94401 03.26.2025 SB330 APPLICATION 04.30.2025 1ST PLANNING SUBMITTAL 08.11.2025 2ND PLANNING SUBMITTAL 12.16.2025 3RD PLANNING SUBMITTAL PA-2024-039 12 SCALE: AREA CALCULATIONS - LEVEL 01 1/16" = 1'-0" 0 10 20 40 60 80 A0.21 AREA CALCULATIONS PER GENERAL PLAN REQUIREMENTS 378 of 786 NO PARKING NO PARKING UP 20% VAN EV CAPABLE COMPACT COMPACT COMPACT COMPACT TURN AROUND UP EV CAPABLE LEVEL 2 EVCS VAN ACCESSIBLE UP 10% EV CAPABLE EV CAPABLE DN 6.0% DN 5.0% DN
5.0% DN 5.0% COMPACT COMPACT UP RETAIL AREA 7,286 SF PARKING AREA 12,288 SF RESIDENTIAL 1,470 SF RESIDENTIAL 608 SF RESIDENTIAL 1,274 SF STAIR #2 204 SF STAIR #1 & RESI ELEVS 469 SF FITNESS 1,550 SF RETAIL AREA PARKING AREA RESIDENTIAL AREA LEVEL 01 RETAIL 7,286 SQ.FT. VISITOR/ RETAIL PARKING (INCLUDING RAMP) 12,288 SQ. FT. RESIDENTIAL LOBBY 2,824 SQ.FT. ELEVATORS/ STAIR #1 (RESIDENTIAL) 469 SQ.FT. STAIR #2 (RESIDENTIAL) 204 SQ. FT. ELECTRICAL (RESIDENTIAL) 608 SQ. FT. TRASH (RESIDENTIAL) 1,479 SQ. FT. FLOOR AREA RETAIL 7,286 SQ. FT. FLOOR AREA RESIDENTIAL 5,584 SQ. FT. LEVEL 04 RESIDENTIAL AREA 17,417 SQ.FT. FLOOR AREA RESIDENTIAL LEVEL 05 RESIDENTIAL AREA 17,417 SQ.FT. FLOOR AREA RESIDENTIAL LEVEL 06 RESIDENTIAL AREA 17,417 SQ.FT. FLOOR AREA RESIDENTIAL LEVEL 07 RESIDENTIAL AREA 17,417 SQ.FT. FLOOR AREA RESIDENTIAL LEVEL 08 RESIDENTIAL AREA 14,782 SQ.FT. FLOOR AREA RESIDENTIAL FAR FLOOR AREA CALCULATIONS (PER ZONING REQUIREMENTS) TOTAL FAR FLOOR AREA RETAIL: 7,286 SQ. FT. TOTAL FAR FLOOR AREA RESIDENTIAL: 90,034 SQ. FT. TOTAL PARKING + RAMP FLOOR AREA: 12,288 SQ. FT. FIRST LEVEL RETAIL SPACE 7,286 SQ. FT. TOTAL: 7,286 SQ. FT. PARKING ORDINANCE AREA CALCULATIONS FAR AREA DESIGNATION BICYCLE PARKING ANALYSIS (PER CITY OF SAN MATEO MUNICIPAL CODE SECTION 27.64.262 REQUIRED SHORT-TERM (RESIDENTIAL) STUDIO AND ONE-BEDROOM UNIT @ 0.05 SPACES PER UNIT 83 UNITS x 0.05 = 4.65 SPACES TWO-BEDROOM UNIT @ 0.1 SPACES PER UNIT 11 UNITS x 0.1 = 1.1 SPACE TOTAL REQUIRED SHORT-TERM (RESIDENTIAL): 5.75 SPACES OR 6 SPACES REQUIRED LONG-TERM (RESIDENTIAL) STUDIO AND ONE-BEDROOM UNIT @ 1.0 SPACE PER UNIT 83 UNITS x 1.0 = 83 SPACES TWO-BEDROOM UNIT @ 1.25 SPACES PER UNIT 11 UNITS x 1.25 = 13.75 SPACES TOTAL REQUIRED LONG-TERM (RESIDENTIAL): 96.75 SPACES OR 97 SPACES REQUIRED SHORT-TERM (RETAIL) 1 PER 2,000 S.F. OF RETAIL SPACE 7,286 S.F. / 2,000 = 3.64 SPACES OR 4 SPACES REQUIRED LONG-TERM (RETAIL) 1 PER 12,000 S.F. OF RETAIL SPACE 7,286 S.F. / 12,000 = 0.60 SPACES OR 1 SPACE PROVIDED SHORT-TERM BIKE (RESIDENTIAL): 6 SPACES (REFER TO SHEET A1.01 FOR LOCATION) PROVIDED SHORT-TERM BIKE SPACES (RETAIL): 4 SPACES (REFER TO SHEET A1.01 FOR LOCATION) PROVIDED LONG-TERM BIKE SPACES (RESIDENTIAL): 97 SPACES (REFER TO SHEET A2.13 FOR LOCATION) PROVIDED LONG-TERM BIKE SPACES (RETAIL): 1 SPACE (REFER TO SHEET A1.01 FOR LOCATION) UPDN UPDN STAIR #1 & RESI ELEVS 469 SF STAIR #2 204 SF RESIDENTIAL 16,264 SF COMMUNITY 1,210 SF UPDN UPDN STAIR #1 & RESI ELEVS 469 SF STAIR #2 204 SF RESIDENTIAL 17,474 SF PROJECT NO: DATE DESCRIPTION Q:\2022 Jobs\225684 - Nazareth Vista Mixed-Use\01-Planning App\2025-MMDD 3RD PLANNING SUBMITTAL\225684-A021_A023.dwg - Dec 22, 2025, 1:02pm - josephinek The "user(s)" in possession of this documentation acknowledge(s) that ARC TEC's and ARC TEC consultants' drawings, specifications, reports, electronic data and other documentation are instruments of service. ARC TEC and ARC TEC consultants shall be deemed the author and owner of such documentation. The "user(s)" in possession of this documentation shall not use or authorize any other person to use ARC TEC's or ARC TEC consultants' instruments of service. Reuse without ARC TEC's written authorization will be at the user(s) sole risk and without liability to ARC TEC and ARC TEC's consultants. The user(s) possessing this documentation shall indemnify and hold harmless ARC TEC and ARC TEC's consultants and agents and employees from and against all claims, damages losses and expenses, including but not limited to attorneys' fees, arising out of unauthorized reuse of ARC TEC o r ARC TEC' s c o n s u l t a n t s i n s tr ume n t s o f s e r v i c e . Written dimensions on this drawing shall have precedence over any scaled dimension. DO NOT SCALE THIS DRAWING for accurate dimensions and notify ARC TEC of any discrepancies. © Copyright ARC TEC, Inc. 2021 In Association with: A R C T E C ARCHITECTURAL TECHNOLOGIES www.arctecinc.com Arizona 2960 East Northern Avenue, Building C Phoenix, AZ 85028 602.953.2355 California 1731 Technology Drive, Suite 750 San Jose, CA 95110 408.496.0676 225684.11 A Planning Applicationt For:
NAZARETH VISTA
606 - 616 SOUTH B STREET
SAN MATEO, CA 94401 03.26.2025 SB330 APPLICATION 04.30.2025 1ST PLANNING SUBMITTAL 08.11.2025 2ND PLANNING SUBMITTAL 12.16.2025 3RD PLANNING SUBMITTAL PA-2024-039 12 SCALE: AREA CALCULATIONS - LEVEL 01 1/16" = 1'-0" 0 10 20 40 60 80 A0.22 AREA CALCULATIONS PER ZONING REQUIREMENTS SCALE: AREA CALCULATIONS - LEVEL 04 1/16" = 1'-0" 0 10 20 40 60 80 SCALE: AREA CALCULATIONS - LEVEL 05 TO LEVEL 07 1/16" = 1'-0" 0 10 20 40 60 80 1 1 379 of 786 UPDN UPDN STAIR #1 & RESI ELEVS 469 SF STAIR #2 204 SF RESIDENTIAL 14,782 SF RETAIL AREA PARKING AREA RESIDENTIAL AREA LEVEL 01 RETAIL 7,286 SQ.FT. VISITOR/ RETAIL PARKING (INCLUDING RAMP) 12,288 SQ. FT. RESIDENTIAL LOBBY 2,824 SQ.FT. ELEVATORS/ STAIR #1 (RESIDENTIAL) 469 SQ.FT. STAIR #2 (RESIDENTIAL) 204 SQ. FT. ELECTRICAL (RESIDENTIAL) 608 SQ. FT. TRASH (RESIDENTIAL) 1,479 SQ. FT. FLOOR AREA RETAIL 7,286 SQ. FT. FLOOR AREA RESIDENTIAL 5,584 SQ. FT. LEVEL 04 RESIDENTIAL AREA 17,417 SQ.FT. FLOOR AREA RESIDENTIAL LEVEL 05 RESIDENTIAL AREA 17,417 SQ.FT. FLOOR AREA RESIDENTIAL LEVEL 06 RESIDENTIAL AREA 17,417 SQ.FT. FLOOR AREA RESIDENTIAL LEVEL 07 RESIDENTIAL AREA 17,417 SQ.FT. FLOOR AREA RESIDENTIAL LEVEL 08 RESIDENTIAL AREA 14,782 SQ.FT. FLOOR AREA RESIDENTIAL FAR FLOOR AREA CALCULATIONS (PER ZONING REQUIREMENTS) TOTAL FAR FLOOR AREA RETAIL: 7,286 SQ. FT. TOTAL FAR FLOOR AREA RESIDENTIAL: 90,034 SQ. FT. TOTAL PARKING + RAMP FLOOR AREA: 12,288 SQ. FT. FIRST LEVEL RETAIL SPACE 7,286 SQ. FT. TOTAL: 7,286 SQ. FT. PARKING ORDINANCE AREA CALCULATIONS FAR AREA DESIGNATION BICYCLE PARKING ANALYSIS (PER CITY OF SAN MATEO MUNICIPAL CODE SECTION 27.64.262 REQUIRED SHORT-TERM (RESIDENTIAL) STUDIO AND ONE-BEDROOM UNIT @ 0.05 SPACES PER UNIT 83 UNITS x 0.05 = 4.65 SPACES TWO-BEDROOM UNIT @ 0.1 SPACES PER UNIT 11 UNITS x 0.1 = 1.1 SPACE TOTAL REQUIRED SHORT-TERM (RESIDENTIAL): 5.75 SPACES OR 6 SPACES REQUIRED LONG-TERM (RESIDENTIAL) STUDIO AND ONE-BEDROOM UNIT @ 1.0 SPACE PER UNIT 83 UNITS x 1.0 = 83 SPACES TWO-BEDROOM UNIT @ 1.25 SPACES PER UNIT 11 UNITS x 1.25 = 13.75 SPACES TOTAL REQUIRED LONG-TERM (RESIDENTIAL): 96.75 SPACES OR 97 SPACES REQUIRED SHORT-TERM (RETAIL) 1 PER 2,000 S.F. OF RETAIL SPACE 7,286 S.F. / 2,000 = 3.64 SPACES OR 4 SPACES REQUIRED LONG-TERM (RETAIL) 1 PER 12,000 S.F. OF RETAIL SPACE 7,286 S.F. / 12,000 = 0.60 SPACES OR 1 SPACE PROVIDED SHORT-TERM BIKE (RESIDENTIAL): 6 SPACES (REFER TO SHEET A1.01 FOR LOCATION) PROVIDED SHORT-TERM BIKE SPACES (RETAIL): 4 SPACES (REFER TO SHEET A1.01 FOR LOCATION) PROVIDED LONG-TERM BIKE SPACES (RESIDENTIAL): 97 SPACES (REFER TO SHEET A2.13 FOR LOCATION) PROVIDED LONG-TERM BIKE SPACES (RETAIL): 1 SPACE (REFER TO SHEET A1.01 FOR LOCATION) PROJECT NO: DATE DESCRIPTION Q:\2022 Jobs\225684 - Nazareth Vista Mixed-Use\01-Planning App\2025-MMDD 3RD PLANNING SUBMITTAL\225684-A021_A023.dwg - Dec 22, 2025, 1:02pm - josephinek The "user(s)" in possession of this documentation acknowledge(s) that ARC TEC's and ARC TEC consultants' drawings, specifications, reports, electronic data and other documentation are instruments of service. ARC TECand ARC TEC consultants shall be deemed the author and owner of suchdocumentation. The "user(s)" in possession of this documentation shall not use or authorize any other person to use ARC TEC's or ARC TEC consultants' instruments of service. Reuse without ARC TEC's written authorization will beat the user(s) sole risk and without liability to ARC TEC and ARC TEC's consultants. The user(s) possessing this documentation shall indemnify and hold harmless ARC TEC and ARC TEC's consultants and agents and employees from and against all claims, damages losses and expenses, including but not limited to attorneys' fees, arising out of unauthorized reuse of ARC TEC o r ARC TEC' s c o n s u l t a n t s i n s tr ume n t s o f s e r v i c e . Written dimensions on this drawing shall have precedence over any scaled dimension. DO NOT SCALE THIS DRAWING for accurate dimensions and notify ARC TEC of any discrepancies. © Copyright ARC TEC, Inc. 2021 In Association with: A R C T E C ARCHITECTURAL TECHNOLOGIES www.arctecinc.com Arizona 2960 East Northern Avenue, Building C Phoenix, AZ 85028 602.953.2355 California 1731 Technology Drive, Suite 750 San Jose, CA 95110 408.496.0676 225684.11 A Planning Applicationt For:
NAZARETH VISTA
606 - 616 SOUTH B STREET
SAN MATEO, CA 94401 03.26.2025 SB330 APPLICATION 04.30.2025 1ST PLANNING SUBMITTAL 08.11.2025 2ND PLANNING SUBMITTAL 12.16.2025 3RD PLANNING SUBMITTAL PA-2024-039 12 SCALE: AREA CALCULATIONS - LEVEL 08 1/16" = 1'-0" 0 10 20 40 60 80 A0.23 AREA CALCULATIONS PER ZONING REQUIREMENTS 380 of 786 NO PARKING NO PARKING UP 20% VAN EV CAPABLE COMPACT COMPACT COMPACT COMPACT TURN AROUND ELEV 01 ## ELEV 02 ## STAIR #01 ## UP RETAIL/ VISITOR PARKING ## GENERATOR ## ELECTRICAL ## FIRE CONTROL ROOM ## PARCELS ## EMR ## RESIDENTIAL LOBBY ## MAIL ## RETAIL ## RETAIL TRASH ## STAIR #02 ## EV CAPABLE LEVEL 2 EVCS VAN ACCESSIBLE RESI. FITNESS CENTER ## UP 10% RESIDENTIAL TRASH ## SHAFT ## EV CAPABLE EV CAPABLE DN 6.0% DN 5.0% DN
5.0% DN 5.0% COMPACT COMPACT UP S O U T H B S T R E E T (70' WIDE PUBLIC STREET) 7 T H A V E N U E
(70' WIDE PUBLIC STREET)
6 T H A V E N U E
(60' WIDE PUBLIC STREET) SCALE: FIRST LEVEL - OPEN SPACE AREA DIAGRAM1"=10'-0" 0 5 10 20 30 50 PROJECT NO: DATE DESCRIPTION Q:\2022 Jobs\225684 - Nazareth Vista Mixed-Use\01-Planning App\2025-MMDD 3RD PLANNING SUBMITTAL\225684-A0.24.dwg - Dec 22, 2025, 1:01pm - josephinek The "user(s)" in possession of this documentation acknowledge(s) that ARC TEC's and ARC TEC consultants' drawings, specifications, reports, electronic data and other documentation are instruments of service. ARC TEC and ARC TEC consultants shall be deemed the author and owner of such documentation. The "user(s)" in possession of this documentation shall not use or authorize any other person to use ARC TEC's or ARC TEC consultants' instruments of service. Reuse without ARC TEC's written authorization will be at the user(s) sole risk and without liability to ARC TEC and ARC TEC's consultants. The user(s) possessing this documentation shall indemnify and hold harmless ARC TEC and ARC TEC's consultants and agents and employees from and against all claims, damages losses and expenses, including but not limited to attorneys' fees, arising out of unauthorized reuse of ARC TEC o r ARC TEC' s c o n s u l t a n t s i n s tr ume n t s o f s e r v i c e . Written dimensions on this drawing shall have precedence over any scaled dimension. DO NOT SCALE THIS DRAWING for accurate dimensions and notify ARC TEC of any discrepancies. © Copyright ARC TEC, Inc. 2021 In Association with: A R C T E C ARCHITECTURAL TECHNOLOGI www.arctecinc.com Arizona 2960 East Northern Avenue, Building C Phoenix, AZ 85028 602.953.2355 California 1731 Technology Drive, Suite 750 San Jose, CA 95110 408.496.0676 225684.11 A Planning Applicationt For:
NAZARETH VISTA
606 - 616 SOUTH B STREET
SAN MATEO, CA 94401 03.26.2025 SB330 APPLICATION 04.30.2025 1ST PLANNING SUBMITTAL 08.11.2025 2ND PLANNING SUBMITTAL 12.16.2025 3RD PLANNING SUBMITTAL PA-2024-039 12 A0.24 COMMERCIAL OPEN SPACE AREA DIAGRAM - FIRST LEVEL A27.38.090 OPEN SPACE REQUIREMENTS. (a) OPEN SPACE SHALL BE PROVIDED IN AN AMOUNT EQUAL TO ONE PERCENT (1%) OF THE NONRESIDENTIAL FLOOR AREA OF THE PROJECT, NOT INCLUDING PARKING, PROVIDED THAT THERE SHALL BE NO REQUIREMENT FOR OPEN SPACE WHERE THE RESULTING OPEN SPACE WOULD BE LESS THAN 200 SQUARE FEET. (b) THIS REQUIRED OPEN SPACE SHALL BE USABLE OPEN SPACE LOCATED AT GROUND LEVEL DIRECTLY ACCESSIBLE TO A PUBLIC SIDEWALK WITH A MINIMUM WIDTH ALONG THE SIDEWALK OF 25 FEET. FIFTY PERCENT OF THE REQUIRED OPEN SPACE SHALL BE UNSHADED BETWEEN NOON AND 2:00 P.M. AT THE SPRING AND FALL EQUINOX EXCEPT WHERE THE OPEN SPACE IS ALREADY SHADED BY AN EXISTING BUILDING AND NO OTHER OPPORTUNITIES EXIST ON THE SITE. THIS OPEN SPACE AREA SHALL INCLUDE PROVISIONS FOR PUBLIC USE FACILITIES, SUCH AS SEATING FOR THE PUBLIC IN THE PUBLIC AREAS COMMERCIAL OPEN SPACE CALCULATIONS OPEN SPACE AT GROUND LEVEL, SHADED BETWEEN NOON-2P ON THE SPRING AND FALL EQUINOX OPEN SPACE AT GROUND LEVEL, UNSHADED BETWEEN NOON-2P ON THE SPRING AND FALL EQUINOX PROVIDED OPEN SPACE 2,904 S.F. SHADED OPEN SPACE 415 S.F. UNSHADED OPEN SPACE 3,319 S.F. PROVIDED OPEN SPACE > 56 S.F. REQUIRED OPEN SPACE REQUIRED UNSHADED OPEN SPACE 50% OF REQUIRED COMMERCIAL OPEN SPACE 56 S.F. * .5 = 28 S.F. REQUIRED UNSHADED OPEN SPACE 415 S.F. PROVIDED UNSHADED OPEN SPACE > 28 S.F. REQUIRED UNSHADED OPEN SPACE SHADED / UNSHADED AREA RATIO: 87% SHADED AREA 13% UNSHADED AREA * (*) OBJECTIVE DESIGN STANDARDS - CHAPTER 5 LANDSCAPING, OPEN SPACE AND EXTERIOR LIGHTING 5.1 LANDSCAPING AND OPEN SPACE 5.1.2 SHADOW REQUIREMENTS - MID-RISE AND HIGH-RISE BUILDINGS: FIFTY (50) PERCENT OF REQUIRED OPEN SPACE SHALL BE UNSHADED BETWEEN THE HOURS OF 12:00 PM AND 2:00 PM AT THE SPRING AND FALL EQUINOX. THIS STANDARD SHALL NOT APPLY WHERE THE OPEN SPACE IS ALREADY SHADED BY AN EXISTING BUILDING AND NO OTHER OPPORTUNITIES FOR ACCESS TO SUNLIGHT EXIST ON THE SITE. THE PROPOSED UNSHADED AREA IS LESS THAN 50% REQUIRED OPEN SPACE TOTAL COMMERCIAL S.F. = 5,584 S.F. 5,584 * .01 = 55.84 S.F. OR 56 S.F. OF REQUIRED OPEN SPACE 381 of 786 UPDN UPDN 74 S.F. PRIVATE RESIDENTIAL PATIO 74 S.F. PRIVATE RESIDENTIAL PATIO 74 S.F. PRIVATE RESIDENTIAL PATIO 74 S.F. PRIVATE RESIDENTIAL BALCONY 74 S.F. PRIVATE RESIDENTIAL BALCONY 74 S.F. PRIVATE RESIDENTIAL BALCONY 74 S.F. PRIVATE RESIDENTIAL BALCONY 88 S.F. PRIVATE RESIDENTIAL BALCONY 74 S.F. PRIVATE RESIDENTIAL BALCONY 58 S.F. PRIVATE RESIDENTIAL BALCONY 5,378 S.F. SHARED RESIDENTIAL OPEN AREA 92 S.F. PRIVATE RESIDENTIAL BALCONY 16'-0" 230'-11" 50'-8" 6'-4"
18'-5" 131'-9" 42'-1"
6'-0"
6'-0"
6'-0" 6'-0" 6'-0"
6'-0"
6'-0"
6'-0"
6'-0"
6'-0" 6'-0" UPDN UPDN 74 S.F. PRIVATE RESIDENTIAL BALCONY 74 S.F. PRIVATE RESIDENTIAL BALCONY 74 S.F. PRIVATE RESIDENTIAL BALCONY 74 S.F. PRIVATE RESIDENTIAL BALCONY 74 S.F. PRIVATE RESIDENTIAL BALCONY 74 S.F. PRIVATE RESIDENTIAL BALCONY 74 S.F. PRIVATE RESIDENTIAL BALCONY 88 S.F. PRIVATE RESIDENTIAL BALCONY 74 S.F. PRIVATE RESIDENTIAL BALCONY 58 S.F. PRIVATE RESIDENTIAL BALCONY 92 S.F. PRIVATE RESIDENTIAL BALCONY 6'-0"
6'-0"
6'-0" 6'-0" 6'-0"
6'-0"
6'-0"
6'-0"
6'-0"
6'-0" 6'-0" UPDN UPDN 260 S.F. PRIVATE RESIDENTIAL BALCONY 220 S.F. PRIVATE RESIDENTIAL BALCONY 195 S.F. PRIVATE RESIDENTIAL BALCONY 91 S.F. PRIVATE RESIDENTIAL BALCONY 195 S.F. PRIVATE RESIDENTIAL BALCONY 195 S.F. PRIVATE RESIDENTIAL BALCONY 627 S.F. PRIVATE RESIDENTIAL BALCONY 92 S.F. PRIVATE RESIDENTIAL BALCONY 96 S.F. PRIVATE RESIDENTIAL BALCONY 152 S.F. PRIVATE RESIDENTIAL BALCONY 74 S.F. PRIVATE RESIDENTIAL BALCONY 74 S.F. PRIVATE RESIDENTIAL BALCONY 74 S.F. PRIVATE RESIDENTIAL BALCONY 277 S.F. PRIVATE RESIDENTIAL BALCONY 611 S.F. PRIVATE RESIDENTIAL BALCONY 6'-0"
6'-0"
6'-0" 9'-2"
16'-5" 15'-10" 15'-2" 27'-11" 26'-8" 28'-7" 28'-5" 25'-10" 15'-0" 25'-10" 26'-4" 53'-11" 9'-0"
6'-2"
49'-7" 38'-8" 9'-2" 6'-2" 8'-10"
9'-0" USABLE RESIDENTIAL OPEN SPACE CALCULATIONS PER SMMC 27.38.130 RESIDENTIAL DEVELOPMENT STANDARDS. (c) OPEN SPACE. RESIDENTIAL DEVELOPMENT SHALL INCLUDE PRIVATE USABLE OPEN SPACE EQUAL TO AT LEAST 80 SQUARE FEET (STATE DENSITY BONUS REQUEST TO REDUCE TO 58 S.F.) PER DWELLING UNIT OR COMMON USABLE OPEN SPACE EQUAL TO AT LEAST 150% OF THE PRIVATE USABLE OPEN SPACE REQUIREMENTS, OR A COMBINATION OF BOTH. PRIVATE USABLE OPEN SPACE USED TO FULFILL THIS REQUIREMENT SHALL HAVE A USABLE AREA OF NOT LESS THAN 75 SQUARE FEET (STATE DENSITY BONUS REQUEST TO REDUCE TO 58 S.F. PER DWELLING UNIT) AND SHALL NOT BE LESS THAN SIX (6) FEET IN ANY DIMENSION. REQUIRED PRIVATE OPEN SPACE (59 UNITS x 58 S.F.): 3,422 S.F. REQUIRED COMMON OPEN SPACE (59 UNITS x (58 S.F. x 150%) : 5,133 S.F. TOTAL REQUIRED OPEN SPACE: 8,555 S.F. PROVIDED PRIVATE OPEN SPACE - LEVEL 04: 830 S.F. PROVIDED PRIVATE OPEN SPACE - LEVEL 05: 830 S.F. PROVIDED PRIVATE OPEN SPACE - LEVEL 06: 830 S.F. PROVIDED PRIVATE OPEN SPACE - LEVEL 07: 830 S.F. PROVIDED PRIVATE OPEN SPACE - LEVEL 08: 3,233 S.F. TOTAL PROVIDED PRIVATE OPEN SPACE: 6,553 S.F. TOTAL PROVIDED COMMON OPEN SPACE: 5,378 S.F. TOTAL PROVIDED OPEN SPACE PRIVATE + COMMON: 11,931 S.F. OPEN SPACE LEGEND PRIVATE RESIDENTIAL OPEN SPACE SHARED RESIDENTIAL OPEN SPACE PROJECT NO: DATE DESCRIPTION Q:\2022 Jobs\225684 - Nazareth Vista Mixed-Use\01-Planning App\2025-MMDD 3RD PLANNING SUBMITTAL\225684-A0.25.dwg - Dec 22, 2025, 1:01pm - josephinek The "user(s)" in possession of this documentation acknowledge(s) that ARC TEC's and ARC TEC consultants' drawings, specifications, reports, electronic data and other documentation are instruments of service. ARC TEC and ARC TEC consultants shall be deemed the author and owner of such documentation. The "user(s)" in possession of this documentation shall not use or authorize any other person to use ARC TEC's or ARC TEC consultants' instruments of service. Reuse without ARC TEC's written authorization will be at the user(s) sole risk and without liability to ARC TEC and ARC TEC's consultants. The user(s) possessing this documentation shall indemnify and hold harmless ARC TEC and ARC TEC's consultants and agents and employees from and against all claims, damages losses and expenses, including but not limited to attorneys' fees, arising out of unauthorized reuse of ARC TEC o r ARC TEC' s c o n s u l t a n t s i n s tr ume n t s o f s e r v i c e . Written dimensions on this drawing shall have precedence over any scaled dimension. DO NOT SCALE THIS DRAWING for accurate dimensions and notify ARC TEC of any discrepancies. © Copyright ARC TEC, Inc. 2021 In Association with: A R C T E C ARCHITECTURAL TECHNOLOGIES www.arctecinc.com Arizona 2960 East Northern Avenue, Building C Phoenix, AZ 85028 602.953.2355 California 1731 Technology Drive, Suite 750 San Jose, CA 95110 408.496.0676 225684.11 A Planning Applicationt For:
NAZARETH VISTA
606 - 616 SOUTH B STREET
SAN MATEO, CA 94401 03.26.2025 SB330 APPLICATION 04.30.2025 1ST PLANNING SUBMITTAL 08.11.2025 2ND PLANNING SUBMITTAL 12.16.2025 3RD PLANNING SUBMITTAL PA-2024-039 12 A0.25 USABLE OPEN SPACE DIAGRAMS SCALE: OPEN SPACE DIAGRAM - LEVEL 05 TO LEVEL 07 1/16" = 1'-0" SCALE: OPEN SPACE DIAGRAM - LEVEL 04 1/16" = 1'-0" SCALE: OPEN SPACE DIAGRAM - LEVEL 08 1/16" = 1'-0" Level 04 Open Space Private Open Space (Balconies) (S.F.) - Provided 830 S.F. Shared Residential Open Area at Level 4 (S.F.) - Provided 5,378 S.F. Level 05 Open Space Private Open Space (Balconies) (S.F.) - Provided 830 S.F. Level 06 Open Space Private Open Space (Balconies) (S.F.) - Provided 830 S.F. Level 07 Open Space Private Open Space (Balconies) (S.F.) - Provided 830 S.F. Level 08 Open Space Private Open Space (Balconies) (S.F.) - Provided 3,233 S.F. TOTAL OPEN SPACE 11,931 S.F. USABLE OPEN SPACE PER FLOOR - RESIDENTIAL Level 05 to Level 07 Open Space Residential Private Open Space (Balconies) (S.F.) - Provided per floor 830 Residential Private Open Space (Balconies) (S.F.) - Provided total 2,490 Level 04 Open Space Residential Private Open Space (Balconies) (S.F.) - Provided 830 Shared Residential Open Area (S.F.) - Provided 5,378 Level 08 Open Space Residential Private Open Space (Balconies) (S.F.) - Provided 3,233 PROJECT DATA: Residential Units Unit Type Unit Area (S.F.) Balcony Area (S.F.) Unit Area w/Balcony (S.F.) # Unit Level 4 # Unit Level 5 # Unit Level 6 # Unit Level 7 # Unit Level 8 Total # Units Density Bonus Parking Req'd Short-Term Bike Pkg Req'd Long-Term Bike Pkg Req'd Total Unit Area Total Balcony Area Unit Mix A1.0 (Studio) 541 0 541 0 3 3 3 3 12 0.50 0.05 1.00 6,492 0 45% A1.1 (Studio) 660 0 660 0 1 1 1 0 3 0.50 0.05 1.00 1,980 0 A1.2 (Studio) 653 0 653 1 1 1 1 0 4 0.50 0.05 1.00 2,612 0 A1.2A (Studio) 553 92 645 0 1 1 1 0 3 0.50 0.05 1.00 1659 276 A1.3 (Studio) 468 0 468 3 3 3 3 0 12 0.50 0.05 1.00 5,616 0 A1.4 (Studio) 517 0 517 1 1 1 1 0 4 0.50 0.05 1.00 2,068 0 A1.5 (Studio) 507 152 659 0 0 0 0 1 1 0.50 0.05 1.00 507 152 A1.6 (Studio) 442 92 534 0 0 0 0 1 1 0.50 0.05 1.00 442 92 A1.6A (Studio) 481 96 577 0 0 0 0 1 1 0.50 0.05 1.00 481 96 A1.7 (Studio) 370 0 370 0 0 0 0 1 1 0.50 0.05 1.00 370 0 B1.0 (1BR/1BA Unit) 820 74 894 1 2 2 2 2 9 0.50 0.05 1.00 7,380 666 42% B1.1 (1BR/1BA Unit) 800 74 874 1 1 1 1 1 5 0.50 0.05 1.00 4,000 370 B1.2 (1BR/1BA Unit) 894 148 1,042 1 1 1 1 0 4 0.50 0.05 1.00 3,576 592 B1.3 (1BR/1BA Unit) 747 74 821 3 3 3 3 0 12 0.50 0.05 1.00 8964 888 B1.4 (1BR/1BA Unit) 832 88 920 1 1 1 1 0 4 0.50 0.05 1.00 3328 352 B1.5 (1BR/1BA Unit) 976 627 1603 0 0 0 0 1 1 0.50 0.05 1.00 976 627 B1.6 (1BR/1BA Unit) 622 195 817 0 0 0 0 3 3 0.50 0.05 1.00 1866 585 B1.7 (1BR/1BA Unit) 670 220 890 0 0 0 0 1 1 0.50 0.05 1.00 670 220 B1.8 (1BR/1BA Unit) 623 260 883 0 0 0 0 1 1 0.50 0.05 1.00 623 260 B1.9 (1BR/1BA Unit) 713 611 1324 0 0 0 0 1 1 0.50 0.05 1.00 713 611 C1.0 (2BR/2BA Unit) 1308 0 1,308 1 1 1 1 0 4 0.50 0.10 1.25 5,232 0 13% C1.1 (2BR/2BA Unit) 1,400 58 1,458 1 1 1 1 0 4 0.50 0.10 1.25 5,600 232 C1.2 (2BR/2BA Unit) 1,118 277 1,395 0 0 0 0 1 1 0.50 0.10 1.25 1,118 277 C1.3 (2BR/1BA Unit) 1,223 92 1,315 1 0 0 0 0 1 0.50 0.10 1.25 1223 92 C1.4 (2BR/2BA Unit) 1,240 74 1314 1 0 0 0 0 1 0.50 0.10 1.25 1240 74 Total # dwelling units 16 20 20 20 18 94 67,495 6,553 Open Space Private Residential Open Space (Level 4/ Level 5/ Level 6/ Level 7 & Level 8) (S.F.) - Provided 6,553 Common Residential Open Space at Level 4 (S.F.) - Provided 5,378 Total open space private + common (residential) - Provided 11,931 382 of 786 PROJECT NO: DATE DESCRIPTION
Q:\2022 Jobs\225684 - Nazareth Vista Mixed-Use\01-Planning App\2025-MMDD 3RD PLANNING SUBMITTAL\225684-A031.dwg - Dec 22, 2025, 1:02pm - josephinek The "user(s)" in possession of this documentation acknowledge(s) that ARC TEC's and ARC TEC consultants' drawings, specifications, reports, electronic data and other documentation are instruments of service. ARC TEC and ARC TEC consultants shall be deemed the author and owner of such documentation. The "user(s)" in possession of this documentation shall not use or authorize any other person to use ARC TEC's or ARC TEC consultants' instruments of service. Reuse without ARC TEC's written authorization will be at the user(s) sole risk and without liability to ARC TEC and ARC TEC's consultants. The user(s) possessing this documentation shall indemnify and hold harmless ARC TEC and ARC TEC's consultants and agents and employees from and against all claims, damages losses and expenses, including but not limited to attorneys' fees, arising out of unauthorized reuse of ARC TEC o r ARC TEC' s c o n s u l t a n t s i n s tr ume n t s o f s e r v i c e . Written dimensions on this drawing shall have precedence over any scaled dimension. DO NOT SCALE THIS DRAWING for accurate dimensions and notify ARC TEC of any discrepancies. © Copyright ARC TEC, Inc. 2021 In Association with: A R C T E C ARCHITECTURAL TECHNOLOGIES www.arctecinc.com Arizona 2960 East Northern Avenue, Building C Phoenix, AZ 85028 602.953.2355 California 1731 Technology Drive, Suite 750 San Jose, CA 95110 408.496.0676 225684.11 A Planning Applicationt For:
NAZARETH VISTA
606 - 616 SOUTH B STREET
SAN MATEO, CA 94401 03.26.2025 SB330 APPLICATION 04.30.2025 1ST PLANNING SUBMITTAL 08.11.2025 2ND PLANNING SUBMITTAL 12.16.2025 3RD PLANNING SUBMITTAL PA-2024-039 12 FIRE-RESISTANCE RATING REQUIREMENTS FOR BUILDING ELEMENTS (HOURS) (TABLE 601) BUILDING ELEMENT TYPE I A TYPE I B TYPE I I A TYPE I I B TYPE I I I A TYPE I I I B TYPE I V TYPE VA TYPE VB Primary Structural Frame (See Section 202) 3 2 1 0 1 0 HT 1 0 Bearing Walls Exterior Interior 33 22 11 00 21 20 2 1/HT 11 00 Nonbearing Walls And Partitions - Exterior See Table 602 Nonbearing Walls And Partitions - Interior 0 0 0 0 0 0 See Section 602.4.6 0 0 Floor Construction and Associated Secondary Members (see Section 202) 2 2 1 0 1 0 HT 1 0 Roof Construction and Associated Secondary Members (see Section 202) 1 1/2 1 1 0 1 0 HT 1 0 a d d f a a a f,g d b b,c b,c c b,c b,c FIRE RESISTANCE . a. Roof supports: Fire-resistance ratings of primary structural frame and bearing walls are permitted to be reduced by 1 hour where supporting a roof only. b1. Except in Group A, E, F-1, H, I, L, M, R-1, R-2, R-2.1 and S 1 occupancies, high-rise buildings, and other applications listed in Section 1.11 regulated by the Office of the State Fire Marshal, fire protection of structural members shall not be required, including protection of roof framing and decking where every part of the roof construction is 20 feet or more above any floor immediately below. Fire-retardant-treated wood members shall be allowed to be used for such unprotected members. b2. For Group A, E, I, L, R-1, R-2, and R-2.1 occupancies, high-rise buildings, and other applications listed in Section 1.11 regulated by the Office of the State Fire Marshal, fire protection of members other than the structural frame shall not be required, including protection of roof framing and decking where every part of the roof construction is 20 feet or more above any floor immediately below. Fire-retardant treated wood members shall be allowed to be used for such unprotected members. b3. For one-story portions of Group A and E assembly occupancies the roof-framing system of Type I I A or Type I I I A construction may be of unprotected construction when such roof-framing system is open to the assembly area and does not contain concealed spaces. c. In all occupancies, heavy timber shall be allowed where a 1-hour or less fire-resistance rating is required. d. Not less than the fire-resistance rating required by other sections of this code. e. Not less than the fire-resistance rating based on fire separation distance (see Table 602). f. Not less than the fire-resistance rating as referenced in Section 704.10. ABOVE-GRADE BUILDING CONSTRUCTION TYPE: LEVELS 1 to 3 TYPE I-A CONSTRUCTION TYPE: LEVELS 4 to 8: TYPE I-B AUTOMATIC SPRINKLER CONFIGURATION: SM (BUILDING TWO OR MORE STORIES ABOVE GRADE PLANE, EQUIPPED THROUGHOUT WITH AN AUTOMATIC SPRINKLER SYSTEM IN ACCORDANCE WITH SECTION 903.3.1.1). OCCUPANCY CLASSIFICATION M/ S2 (type I-A) R-2 (type I-B) MAXIMUM HEIGHT (TABLE 504.3) UNLIMITED 180 FT MAXIMUM NUMBER OF STORIES (TABLE 504.4) UNLIMITED 12 SM ALLOWABLE AREA FACTOR (TABLE 506.2) UNLIMITED UNLIMITED HEIGHT OF PROPOSED BUILDING 84'-10" (TOP OF PLATE) NUMBER OF STORIES ABOVE GRADE 8 PROPOSED AREA PER FLOOR LEVEL 01 - MERCANTILE 7,286 S.F. M LEVEL 01 - RESIDENTIAL 5,584 S.F. R-2 LEVEL 01 - PARKING 12,288 S.F. S-2 LEVEL 02 - PARKING 24,459 S.F. S-2 LEVEL 03 - PARKING 24,459 S.F. S-2 LEVEL 04 - RESIDENTIAL 18,147 S.F. R-2 LEVEL 05 - RESIDENTIAL 18,147 S.F. R-2 LEVEL 06 - RESIDENTIAL 18,147 S.F. R-2 LEVEL 07 - RESIDENTIAL 18,147 S.F. R-2 LEVEL 08 - RESIDENTIAL 15,455 S.F. R-2 TOTAL BUILDING AREA ABOVE GRADE 162,119 S.F. ALLOWABLE BUILDING AREA PLUMBING FIXTURE TABULATIONS 2022 CALIFORNIA BUILDING CODE - PLUMBING TABLE 422.1 - MINIMUM PLUMBING FIXTURES Each building shall be provided with sanitary facilities, including provisions for persons with disabilities as prescribed by the Department Having Jurisdiction. Table 422.1 applies to new buildings, additions to a building, and changes of occupancy or type in an existing building resulting in increased occupant load. In accordance with Sections 1.8.7 and 301.3, the Authority Having Jurisdiction may approve alternative design criteria when determining the minimum number of plumbing fixtures For requirements for persons with disabilities, Chapter 11A or 11B of the California Building Code shall be used. The total occupant load shall be determined in accordance with the Occupant Load Factor Table A. Water Closets (Fixtures per Person) Bathtubs or Showers (Fixtures per Person) Drinking Fountains (Fixtures per Person) Urinals (Fixtures per Person) Lavatories (Fixtures per Person) 1 3 Other CALIFORNIA BUILDING CODE - TABLE 1004.5 - MAXIMUM FLOOR AREA ALLOWANCES PER OCCUPANT OCCUPANCY *, ** OCCUPANT LOAD FACTOR (square feet) LEVEL 01 FLOOR (RETAIL) MERCANTILE OCCUPANCY (M) NET AREA: 7,286 S.F. 7,286 S.F / 60 S.F. PER PERSON = 121.43 PERSONS; ROUND UP TO 122 PERSONS OR 61 MEN & 61 WOMEN MEN'S FIXTURES REQUIRED: WOMEN'S FIXTURES REQUIRED: WATER CLOSETS: 61 OCCUPANTS or 1 WATER CLOSETS: 61 OCCUPANTS or 1 URINALS: 61 OCCUPANTS or 0 LAVATORIES: 61 OCCUPANTS or 1 LAVATORIES: 61 OCCUPANTS or 1 RESTROOM FIXTURE REQUIREMENTS AND PROVIDED (DURING TENANT IMPROVEMENT OF THE RETAIL AREA) TOTAL FOR LEVEL 01 FLOOR RETAIL PER CBC SECTION 422.1: WHERE APPLYING THE FIXTURE RATIOS IN TABLE 422.1 RESULTS IN FRACTIONAL NUMBERS, SUCH NUMBERS SHALL BE ROUNDED TO THE NEXT WHOLE NUMBER. FOR MULTIPLE OCCUPANCIES, FRACTIONAL NUMBERS SHALL BE FIRST SUMMED AND THEN ROUNDED TO THE NEXT WHOLE NUMBER. Male: Female 1 : 1-200 1: 1-200 2: 201-400 2: 201-300 3: 301-400 Over 400, add 1 fixture for each additional 500 males and 1 fixture for each 400 females. Male: 0: 1-200 1: 201-400 Over 400, add 1 fixture for each additional 500 males. M Mercantile occupancy (the sale of merchandise and accessible to the public) Male: Female 1 : 1-100 1: 1-100 2: 101-200 2: 101-200 3: 201-400 4: 201-300 6: 301-400 Over 400, add 1 fixture for each additional 500 males and 1 fixture for each additional 200 females. 1: 1-250 2: 251-500 3: 501-750 Over 750, add 1 fixture for each additional 500 persons. 1 service sink or laundry tray Group M - LEVEL 01 Retail or wholesale stores 60 gross Group R2 - LEVELS 04 TO 08 Residential Dwelling Units 200 gross Group S2 - LEVELS 01 TO LEVEL 03 Parking Garage 150 gross A0.31 BUILDING CODE DATA 1 1 383 of 786 NO PARKING NO PARKING UP 20% VAN EV CAPABLE COMPACT COMPACT COMPACT COMPACT TURN AROUND ELEV 01 ## ELEV 02 ## STAIR #01 ## UP RETAIL/ VISITOR PARKING ## GENERATOR ## ELECTRICAL ## FIRE CONTROL ROOM ## PARCELS ## EMR ## RESIDENTIAL LOBBY ## MAIL ## RETAIL ## RETAIL TRASH ## STAIR #02 ## A 1 B C D E F G H K 2452.2 2.5 C.1 2.73 B.3 B.5 J 4.5 A.6 B.6 B.6 D.4 F.6 G.4 H.2 J.1 2.4 EV CAPABLE LEVEL 2 EVCS VAN ACCESSIBLE RESI. FITNESS CENTER ## UP 10% RESIDENTIAL TRASH ## SHAFT ## EV CAPABLE EV CAPABLE DN 6.0% DN 5.0% DN
5.0% DN 5.0% COMPACT COMPACT UP 1 : S.F. PARKING S-2 12,288200 61 1 : S.F. RETAIL M 7,28660 121 1 : S.F. RESI./ LEASING B 1,290150 9 31 6.2" 34" 106 21.2" 34" 306" 68" 6131 108 30 16 30 306" 68" 30 1 : S.F. RESI. FITNESS CENTER A3 1,53450 31 306" 68" 30 31 6.2" 68" 31 16 3.2" 68" 36.2" 34" 15 306" 34" 61 12.2" 34" 61 18.3" 60" 61 12.2" 34" 61 18.3" 60" DIAGONAL DISTANCE: 184'-418" 177'-315 16" IS > 1/3 DIAGONAL DISTANCE ELEV 01 ## ELEV 02 ## STAIR #01 ## GENERATOR ## FIRE CONTROL ROOM ## PARCELS ## ## RESIDENTIAL LOBBY ## MAIL ## RETAIL ## RETAIL TRASH ## STAIR #02 ## RESI. FITNESS CENTER ## RESIDENTIAL TRASH ## SHAFT ## EV READY EV READYEV READY COMPACT / EV READY COMPACT / EV READY COMPACT / EV READY COMPACT COMPACT / EV READY EV READY COMPACT EV READY EV READY EV READY EV READY EV READY EV READY EV READY EV READY DN 10% DN 18% NO PARKING STOP EV READY NO PARKING VAN COMPACT / EV READY EV READY COMPACT / EV READY EV READY A 1 B C D E F G H K 2452.2 2.5 C.1 2.73 B.3 B.5 J 4.5 A.6 B.6 B.6 D.4 F.6 G.4 H.2 J.1 2.4 ELEV 01 ## ELEV 02 ## UPDN STAIR #02 ## STAIR #01 ## UPDN RESIDENTIAL PARKING ## MOTORCYCLE PARKING R=33' R=35' R=33' R=35' R=33' R=35'
EV READY
COMPACT /
EV READY
COMPACT /
EV READY
COMPACT /
EV READY
COMPACT / EV READY
COMPACT /
EV READY
COMPACT /
EV READY
COMPACT /
UP
10%
UP
18% EV READY EV READY EV READY COMPACT COMPACT MOTORCYCLE PARKING SHAFT ##
EV READY
COMPACT / EV READY EV READY EV READY EV READY EV READY EV READY 1 : S.F. PARKING S-2 24,459200 122 61 6161 12.2" 34" 61 18.3" 60" 184'-8" IS > 1/3 DIAGONAL DISTANCE DIAGONAL DISTANCE: 253'-5" 61 12.2" 34" 61 18.3" 60" EV READY EV READYEV READY COMPACT / EV READY COMPACT / EV READY COMPACT / EV READY COMPACT / EV READY
EV READY
COMPACT / COMPACT / EV READY EV READY EV READY EV READY EV READY EV READY EV READY EV READY EV READY EV READY DN 10% NO PARKING
EV READY
COMPACT /
STOP COMPACT / EV READY EV READY EV READY EV READY NO PARKING ELEV 01 ## ELEV 02 ## RESI.LONG-TERM BIKE STORAGE ## RESIDENTIAL PARKING ## UPDN STAIR #02 ## STAIR #01 ## MOTORCYCLE PARKING R=33' R=35' R=33' R=35'
EV READY
COMPACT LEVEL 2 EVCS STANDARD ACCESSIBLE LEVEL 2 EVCS VAN ACCESSIBLE MOTORCYCLE PARKING EV READY COMPACT EV READYEV READY COMPACTCOMPACT A 1 B C D E F G H K 2452.2 2.5 C.1 2.73 B.3 B.5 J 4.5 A.6 B.6 B.6 D.4 F.6 G.4 H.2 J.1 2.4 UPDN SHAFT ##
EV READY
COMPACT
EV READY
COMPACT EV READY EV READY EV READY EV READY EV READY EV READY COMPACT EV READY EV READY EV READY EV READY EV READY
EV READY
COMPACT /
EV READY
COMPACT /
EV READY
COMPACT / DN 18% 1 : S.F. PARKING S-2 24,459200 122 184'-8" IS > 1/3 DIAGONAL DISTANCE DIAGONAL DISTANCE: 253'-5" 61 6161 12.2" 34" 61 18.3" 60" 61 12.2" 34" 61 18.3" 60" PROJECT NO: DATE DESCRIPTION Q:\2022 Jobs\225684 - Nazareth Vista Mixed-Use\01-Planning App\2025-MMDD 3RD PLANNING SUBMITTAL\225684-A0.32-A0.34.dwg - Dec 22, 2025, 1:01pm - josephinek The "user(s)" in possession of this documentation acknowledge(s) that ARC TEC's and ARC TEC consultants' drawings, specifications, reports, electronic data and other documentation are instruments of service. ARC TEC and ARC TEC consultants shall be deemed the author and owner of such documentation. The "user(s)" in possession of this documentation shall not use or authorize any other person to use ARC TEC's or ARC TEC consultants' instruments of service. Reuse without ARC TEC's written authorization will be at the user(s) sole risk and without liability to ARC TEC and ARC TEC's consultants. The user(s) possessing this documentation shall indemnify and hold harmless ARC TEC and ARC TEC's consultants and agents and employees from and against all claims, damages losses and expenses, including but not limited to attorneys' fees, arising out of unauthorized reuse of ARC TEC o r ARC TEC' s c o n s u l t a n t s i n s tr ume n t s o f s e r v i c e . Written dimensions on this drawing shall have precedence over any scaled dimension. DO NOT SCALE THIS DRAWING for accurate dimensions and notify ARC TEC of any discrepancies. © Copyright ARC TEC, Inc. 2021 In Association with: A R C T E C ARCHITECTURAL TECHNOLOGIES www.arctecinc.com Arizona 2960 East Northern Avenue, Building C Phoenix, AZ 85028 602.953.2355 California 1731 Technology Drive, Suite 750 San Jose, CA 95110 408.496.0676 225684.11 A Planning Applicationt For:
NAZARETH VISTA
606 - 616 SOUTH B STREET
SAN MATEO, CA 94401 03.26.2025 SB330 APPLICATION 04.30.2025 1ST PLANNING SUBMITTAL 08.11.2025 2ND PLANNING SUBMITTAL 12.16.2025 3RD PLANNING SUBMITTAL PA-2024-039 12 A0.32 EGRESS DIAGRAMS SCALE: EGRESS PLAN - LEVEL 02 1/16" = 1'-0" SCALE: EGRESS PLAN - LEVEL 01 1/16" = 1'-0" SCALE: EGRESS PLAN - LEVEL 03 1/16" = 1'-0" 2-HOUR RATED FIRE SEPARATION 1-HOUR RATED FIRE SEPARATION DIRECTION OF EGRESS OCCUPANT LOAD FIRE EXTINGUISHER BRACKET-MOUNTED OCCUPANCY CLASSIFICATION OF THE SPACE SQUARE FOOTAGE OCCUPANT LOAD FACTOR NUMBER OF OCCUPANTS NUMBER OF OCCUPANTS EXIT WIDTH REQUIRED EXIT WIDTH PROVIDED NUMBER OF OCCUPANTS STAIR WIDTH REQUIRED (INCHES) STAIR WIDTH PROVIDED (INCHES) EXIT IN ONE DIRECTION EXIT IN BOTH DIRECTIONS SIGN FACE DIRECTION F.E AREA OCCUPANT LOAD DESIGNATION DOORWAY OCCUPANT LOAD DESIGNATION STAIRWAY OCCUPANT LOAD DESIGNATION PATH OF TRAVEL DESIGNATION DIRECTION OF EGRESS/OCCUPANT LOAD DESIGNATION FIRE EXTINGUISHERS AND FIRE HOSES EXIT SIGNAGE DESIGNATION RATED SEPARATION DESIGNATION F.E.C. F.E.C. 100 30.0 60 100 20.0 34 25 1 : S.F. ROOM NAME B 12,444150 - DIRECTION OF TRAVEL EXITING WIDTH TABULATIONS . THIS BUILDING IS EQUIPPED WITH AUTOMATIC SPRINKLER SYSTEM. EXIT WIDTH REQUIRED IS 0.3" PER PERSON FOR STAIRS AND 0.2" PER DOORS AND OTHER EXIT ELEMENTS, PER CBC SECTION 1005.3. SYMBOL KEY384 of 786 A 1 B C D E F G H K 2452.2 2.5 C.1 2.73 B.3 B.5 J 4.5 A.6 B.6 B.6 D.4 F.6 G.4 H.2 J.1 2.4 UNIT B1.4 1BR/ 1BA 832 S.F. UNIT C1.1 2BR/ 2BA 1,400 S.F. UPDN UPDN UNIT C1.0 2BR/ 2BA 1,308 S.F. UNIT B1.2 1BR/ 1BA 894 S.F. UNIT A1.1 STUDIO 660 S.F. UNIT B1.3 1BR/ 1BA 747 S.F. UNIT B1.3 1BR/ 1BA 747 S.F. UNIT B1.3 1BR/ 1BA 747 S.F. UNIT A1.4 STUDIO 517 S.F. UNIT A1.3 (BMR - VLI) STUDIO 468 S.F. UNIT A1.3 STUDIO 468 S.F. UNIT A1.3 STUDIO 468 S.F. UNIT B1.0 1BR/ 1BA 820 S.F. UNIT B1.1 (BMR - VLI) 1BR/ 1BA 800 S.F. UNIT B1.0 1BR/ 1BA 820 S.F. UNIT A1.0 STUDIO 541 S.F. UNIT A1.0 STUDIO 541 S.F. UNIT A1.0 STUDIO 541 S.F. UNIT A1.2 STUDIO 653 S.F. UNIT A1.2A STUDIO 563 S.F. 1 : S.F. DWELLING UNIT R-2 653200 3 1 : S.F. DWELLING UNIT R-2 563200 3 1 : S.F. DWELLING UNIT R-2 660200 4 1 : S.F. DWELLING UNIT R-2 894200 5 1 : S.F. DWELLING UNIT R-2 468200 2 1 : S.F. DWELLING UNIT R-2 517200 2 1 : S.F. DWELLING UNIT R-2 747200 4 1 : S.F. DWELLING UNIT R-2 832200 4 1 : S.F. DWELLING UNIT R-2 747200 4 1 : S.F. DWELLING UNIT R-2 747200 4 1 : S.F. DWELLING UNIT R-2 820200 4 1 : S.F. DWELLING UNIT R-2 800200 4 1 : S.F. DWELLING UNIT R-2 820200 4 1 : S.F. DWELLING UNIT R-2 541200 2 35 10.5" 60" 35 36 357" 34" 36 7.2" 34" 36 10.8" 60" 1 : S.F. DWELLING UNIT R-2 1,308200 7 1 : S.F. DWELLING UNIT R-2 1,400200 7 1 : S.F. DWELLING UNIT R-2 541200 2 1 : S.F. DWELLING UNIT R-2 541200 2 1 : S.F. DWELLING UNIT R-2 468200 2 1 : S.F. DWELLING UNIT R-2 468200 2 DIAGONAL DISTANCE: 247'-118" 182'-814" IS > 1/3 DIAGONAL DISTANCE A 1 B C D E F G H K 2452.2 2.5 C.1 2.73 B.3 B.5 J 4.5 A.6 B.6 B.6 D.4 F.6 G.4 H.2 J.1 2.4 UPDN UPDN UNIT A1.5 STUDIO 507 S.F. UNIT A1.6A STUDIO 481 S.F. UNIT A1.6 STUDIO 442 S.F. UNIT B1.6 1BR/ 1BA 622 S.F. UNIT B1.5 1BR/ 1BA 976 S.F. UNIT B1.6 1BR/ 1BA 622 S.F. UNIT B1.6 1BR/ 1BA 622 S.F. UNIT B1.7 1BR/ 1BA 670 S.F. UNIT A1.7 STUDIO 370 S.F. UNIT B1.8 1BR/ 1BA 623 S.F. UNIT B1.9 1BR/ 1BA 713 S.F. UNIT C1.2 2BR/ 2BA 1,118 S.F. UNIT B1.0 1BR/ 1BA 820 S.F. UNIT B1.1 1BR/ 1BA 800 S.F. UNIT B1.0 1BR/ 1BA 820 S.F. UNIT A1.0 STUDIO 541 S.F. UNIT A1.0 STUDIO 541 S.F. UNIT A1.0 STUDIO 541 S.F. 27" 8.1" 60" 27 1 : S.F. DWELLING UNIT R-2 820200 4 1 : S.F. DWELLING UNIT R-2 800200 4 1 : S.F. DWELLING UNIT R-2 820200 4 1 : S.F. DWELLING UNIT R-2 541200 2 1 : S.F. DWELLING UNIT R-2 541200 2 1 : S.F. DWELLING UNIT R-2 541200 2 28 27 5.4" 34" 28 5.6" 34" 28 8.4" 60" 1 : S.F. DWELLING UNIT R-2 976200 5 1 : S.F. DWELLING UNIT R-2 622200 3 1 : S.F. DWELLING UNIT R-2 622200 3 1 : S.F. DWELLING UNIT R-2 370200 2 1 : S.F. DWELLING UNIT R-2 622200 3 1 : S.F. DWELLING UNIT R-2 670200 3 1 : S.F. DWELLING UNIT R-2 623200 3 1 : S.F. DWELLING UNIT R-2 713200 41 : S.F. DWELLING UNIT R-2 1,118200 6 1 : S.F. DWELLING UNIT R-2 507200 2 1 : S.F. DWELLING UNIT R-2 481200 2 1 : S.F. DWELLING UNIT R-2 442200 2 DIAGONAL DISTANCE: 224'-61116" 182'-814" IS > 1/3 DIAGONAL DISTANCE A 1 B C D E F G H K 2452.2 2.5 C.1 2.73 B.3 B.5 J 4.5 A.6 B.6 B.6 D.4 F.6 G.4 H.2 J.1 2.4 ELEC. RM ## LARGE TRASH ## ELEVATOR LOBBY ## STAIR #01 ## ELEV 01 ## ELEV 02 ## HALLWAY ## UPDN UPDN STAIR #02 ## CHUTE VESTIBULE ## 74 S.F. PRIVATE BALCONY ## 88 S.F. PRIVATE BALCONY ## PRIVATE BALCONY ## 58 S.F. 74 S.F. PRIVATE PATIO ## 74 S.F. PRIVATE BALCONY ## 74 S.F. PRIVATE BALCONY ## 74 S.F. PRIVATE BALCONY ## 74 S.F. PRIVATE BALCONY ## 74 S.F. PRIVATE PATIO ## SHARED RESIDENTIAL OPEN AREA ## UNIT B1.0 1BR/ 1BA 820 S.F. UNIT B1.1 1BR/ 1BA 800 S.F. UNIT B1.4 1BR/ 1BA 832 S.F. UNIT C1.1 2BR/ 2BA 1,400 S.F. UNIT C1.0 2BR/ 2BA 1,308 S.F. UNIT B1.2 1BR/ 1BA 894 S.F. UNIT A1.2 (BMR - VLI) STUDIO 653 S.F. UNIT B1.3 1BR/ 1BA 747 S.F. UNIT B1.3 1BR/ 1BA 747 S.F. UNIT B1.3 (BMR - VLI) 1BR/ 1BA 747 S.F. UNIT A1.4 STUDIO 517 S.F. UNIT A1.3 STUDIO 468 S.F. UNIT A1.3 STUDIO 468 S.F. UNIT A1.3 STUDIO 468 S.F. COMMUNITY CENTER ## UNIT C1.3 2BR/ 1BA 1,223 S.F. UNIT C1.4 (BMR - VLI) 2BR/ 2BA 1,240 S.F. 74 S.F. PRIVATE PATIO ## 92 S.F. PRIVATE BALCONY ## SHAFT ## 1 : S.F. DWELLING UNIT R-2 653200 3 1 : S.F. DWELLING UNIT R-2 894200 5 1 : S.F. DWELLING UNIT R-2 468200 2 1 : S.F. DWELLING UNIT R-2 517200 2 1 : S.F. DWELLING UNIT R-2 747200 4 1 : S.F. DWELLING UNIT R-2 832200 4 1 : S.F. DWELLING UNIT R-2 747200 4 1 : S.F. DWELLING UNIT R-2 747200 4 1 : S.F. DWELLING UNIT R-2 820200 4 1 : S.F. DWELLING UNIT R-2 800200 4 1 : S.F. DWELLING UNIT R-2 1,240200 6 1 : S.F. RESI COMMON AREA A-2 5,37815 358 --60 -- --34 --34 --60 40 408" 34" 179 179 35.8" 36" -- 1 : S.F. DWELLING UNIT R-2 1,308200 7 1 : S.F. DWELLING UNIT R-2 1,400200 7 1 : S.F. COMMUNITY CENTER A-2 1,20915 81 1 : S.F. DWELLING UNIT R-2 1,223200 6 1 : S.F. DWELLING UNIT R-2 468200 2 1 : S.F. DWELLING UNIT R-2 468200 2 179 179 35.8" 36" DIAGONAL DISTANCE: 247'-118" 182'-814" IS > 1/3 DIAGONAL DISTANCE DIAGONAL DISTANCE: 231'-3716" 132'-33 8" IS > 1/3 DIAGONAL DISTANCE 2-HOUR RATED FIRE SEPARATION 1-HOUR RATED FIRE SEPARATION DIRECTION OF EGRESS OCCUPANT LOAD FIRE EXTINGUISHER BRACKET-MOUNTED OCCUPANCY CLASSIFICATION OF THE SPACE SQUARE FOOTAGE OCCUPANT LOAD FACTOR NUMBER OF OCCUPANTS NUMBER OF OCCUPANTS EXIT WIDTH REQUIRED EXIT WIDTH PROVIDED NUMBER OF OCCUPANTS STAIR WIDTH REQUIRED (INCHES) STAIR WIDTH PROVIDED (INCHES) EXIT IN ONE DIRECTION EXIT IN BOTH DIRECTIONS SIGN FACE DIRECTION F.E AREA OCCUPANT LOAD DESIGNATION DOORWAY OCCUPANT LOAD DESIGNATION STAIRWAY OCCUPANT LOAD DESIGNATION PATH OF TRAVEL DESIGNATION DIRECTION OF EGRESS/OCCUPANT LOAD DESIGNATION FIRE EXTINGUISHERS AND FIRE HOSES EXIT SIGNAGE DESIGNATION RATED SEPARATION DESIGNATION F.E.C. F.E.C. 100 30.0 60 100 20.0 34 25 1 : S.F. ROOM NAME B 12,444150 - DIRECTION OF TRAVEL EXITING WIDTH TABULATIONS . THIS BUILDING IS EQUIPPED WITH AUTOMATIC SPRINKLER SYSTEM. EXIT WIDTH REQUIRED IS 0.3" PER PERSON FOR STAIRS AND 0.2" PER DOORS AND OTHER EXIT ELEMENTS, PER CBC SECTION 1005.3. PROJECT NO: DATE DESCRIPTION Q:\2022 Jobs\225684 - Nazareth Vista Mixed-Use\01-Planning App\2025-MMDD 3RD PLANNING SUBMITTAL\225684-A0.32-A0.34.dwg - Dec 22, 2025, 1:01pm - josephinek The "user(s)" in possession of this documentation acknowledge(s) that ARC TEC's and ARC TEC consultants' drawings, specifications, reports, electronic data and other documentation are instruments of service. ARC TEC and ARC TEC consultants shall be deemed the author and owner of such documentation. The "user(s)" in possession of this documentation shall not use or authorize any other person to use ARC TEC's or ARC TEC consultants' instruments of service. Reuse without ARC TEC's written authorization will be at the user(s) sole risk and without liability to ARC TEC and ARC TEC's consultants. The user(s) possessing this documentation shall indemnify and hold harmless ARC TEC and ARC TEC's consultants and agents and employees from and against all claims, damages losses and expenses, including but not limited to attorneys' fees, arising out of unauthorized reuse of ARC TEC o r ARC TEC' s c o n s u l t a n t s i n s tr ume n t s o f s e r v i c e . Written dimensions on this drawing shall have precedence over any scaled dimension. DO NOT SCALE THIS DRAWING for accurate dimensions and notify ARC TEC of any discrepancies. © Copyright ARC TEC, Inc. 2021 In Association with: A R C T E C ARCHITECTURAL TECHNOLOGIES www.arctecinc.com Arizona 2960 East Northern Avenue, Building C Phoenix, AZ 85028 602.953.2355 California 1731 Technology Drive, Suite 750 San Jose, CA 95110 408.496.0676 225684.11 A Planning Applicationt For:
NAZARETH VISTA
606 - 616 SOUTH B STREET
SAN MATEO, CA 94401 03.26.2025 SB330 APPLICATION 04.30.2025 1ST PLANNING SUBMITTAL 08.11.2025 2ND PLANNING SUBMITTAL 12.16.2025 3RD PLANNING SUBMITTAL PA-2024-039 12 A0.33 EGRESS DIAGRAMS SCALE: EGRESS PLAN - LEVEL 08 1/16" = 1'-0" SCALE: EGRESS PLAN - LEVEL 05 TO LEVEL 07 1/16" = 1'-0" SYMBOL KEY SCALE: EGRESS PLAN - LEVEL 04 1/16" = 1'-0" 385 of 786 2 12 12 2 S. B STREET 3 3 2 10 211111111 11 2 5 5 8 8 4 44 12 12 1515 15 2 8 1 7TH AVENUE
6TH AVENUE 2 1 EXISTING BUILDING STRUCTURE EXISTING BUILDING STRUCTURE 6 6 13 13 13 6 14 EXTG. TREE T5REMOVED TO BE EXTG. TREE T4REMOVED TO BE EXTG. TREE T3REMOVED TO BE EXTG. TREE T2REMOVED TO BE EXTG. TREE T1 TO BE REMOVED EXTG. TREE T8 TO REMAIN EXTG. TREE T7 TO REMAIN EXTG. TREE T6REMOVED TO BE EXTG. TREE TO REMAIN 5 EXISTING STRUCTURE TO BE DEMOLISHED. REMOVE EXISTING TREE OR SHRUB 24 KEYNOTES . 31 NO DEMO SCOPE OF WORK AT THIS AREA 6 EXISTING PAVED PARKING AND DRIVES TO BE REMOVED. EXISTING CONCRETE SLAB TO BE DEMOLISHED. REMOVE EXISTING SIGNAGE 8 EXISTING SIDEWALK/ ROADWAY FRONTAGE TO BE DEMOLISHED AND REPLACED 7 DEMOLISH EXISTING CONCRETE STEPS/RAMP AND HANDRAIL. 9 EXISTING GAS METER TO BE REMOVED. CAP ALL UTILITIES PER LOCAL AGENCY REQUIREMENTS. 10 DEMOLISH EXISTING FENCE. 11 DEMOLISH EXISTING WHEEL STOP. PROJECT NO: DATE DESCRIPTION Q:\2022 Jobs\225684 - Nazareth Vista Mixed-Use\01-Planning App\2025-MMDD 3RD PLANNING SUBMITTAL\225684-A100.dwg - Dec 22, 2025, 1:02pm - josephinek The "user(s)" in possession of this documentation acknowledge(s) that ARC TEC's and ARC TEC consultants' drawings, specifications, reports, electronic data and other documentation are instruments of service. ARC TEC and ARC TEC consultants shall be deemed the author and owner of such documentation. The "user(s)" in possession of this documentation shall not use or authorize any other person to use ARC TEC's or ARC TEC consultants' instruments of service. Reuse without ARC TEC's written authorization will be at the user(s) sole risk and without liability to ARC TEC and ARC TEC's consultants. The user(s) possessing this documentation shall indemnify and hold harmless ARC TEC and ARC TEC's consultants and agents and employees from and against all claims, damages losses and expenses, including but not limited to attorneys' fees, arising out of unauthorized reuse of ARC TEC o r ARC TEC' s c o n s u l t a n t s i n s tr ume n t s o f s e r v i c e . Written dimensions on this drawing shall have precedence over any scaled dimension. DO NOT SCALE THIS DRAWING for accurate dimensions and notify ARC TEC of any discrepancies. © Copyright ARC TEC, Inc. 2021 In Association with: A R C T E C ARCHITECTURAL TECHNOLOGIES www.arctecinc.com Arizona 2960 East Northern Avenue, Building C Phoenix, AZ 85028 602.953.2355 California 1731 Technology Drive, Suite 750 San Jose, CA 95110 408.496.0676 225684.11 A Planning Applicationt For:
NAZARETH VISTA
606 - 616 SOUTH B STREET
SAN MATEO, CA 94401 03.26.2025 SB330 APPLICATION 04.30.2025 1ST PLANNING SUBMITTAL 08.11.2025 2ND PLANNING SUBMITTAL 12.16.2025 3RD PLANNING SUBMITTAL PA-2024-039 12 SCALE: DEMOLITION SITE PLAN 3/32" = 1'-0" 0 5 10 20 30 50 70 A1.00 DEMOLITION SITE PLAN 12 REMOVE ASPHALT CURB. 13 EXISTING TREE TO REMAIN. 14 EXISTING LOW RETAINING WALL TO REMAIN. 15 EXISTING LOW WALL TO BE DEMOLISHED. TREE SPECIES SPECIFIC TREE PROTECTION: - REMOVE TREES T1, T2, T3, T4, T5 AND T6 AS DESIGNATED - INSTALL TREE PROTECTION FENCING AROUND TREE T7 TREE 'T1' AMERICAN SWEET GUM (LIQUIDAMBAR STYRACIFLUA) TREE 'T2' AMERICAN SWEET GUM (LIQUIDAMBAR STYRACIFLUA) TREE 'T3' AMERICAN SWEET GUM (LIQUIDAMBAR STYRACIFLUA) TREE 'T4' AMERICAN SWEET GUM (LIQUIDAMBAR STYRACIFLUA) TREE 'T5' AMERICAN SWEET GUM (LIQUIDAMBAR STYRACIFLUA) TREE 'T6' SOUTHERN MAGNOLIA (MAGNOLIA GRANDIFLORA ' MAJESTIC BEAUTY') TREE 'T7' CAMPHOR (CINNAMOMUM CAMPHORA) TREE 'T8' SOUTHERN MAGNOLIA (MAGNOLIA GRANDIFLORA ' MAJESTIC BEAUTY') 386 of 786 NO
PARKING
NO
PARKING
UP 20%
VAN
EV CAPABLE COMPACT COMPACT COMPACT
COMPACT
TURN
AROUND
UP
EV CAPABLE
LEVEL 2 EVCS
VAN
ACCESSIBLE
UP 10%
EV CAPABLE EV CAPABLE
DN 6.0%
DN 5.0%
DN
5.0%
DN 5.0%
COMPACT COMPACT
UP
S O U T H B S T R E E T
(70' WIDE PUBLIC STREET)
7 T H A V E N U E
(70' WIDE PUBLIC STREET)
6 T H A V E N U E
(60' WIDE PUBLIC STREET)
4 19
10 10
1 20
1 15
TYP.
6 6
6 32
53 10
35 TYP.
15 TYP.
14 36
34 33
21 1
10 11
30 29
27 26
12 31
7 28
8 3
TYP.
1 45'-0"
45'-0"
10'-0"
10'-0"
10'-0"
10'-0"
45'-0"
45'-0"
38 21222324
23 TYP.
22 TYP.
25 TYP.
49 23
TYP.
8 13
9 21
21 37
20 2020
17 17
17 17
17 17
1717
'T6'
'T7'
'T5' 'T4'
'T3' 'T9'
'T2''T1'
12 9'-0"
36'-0"
24 6
32 21'-0"
10'-0"
10'-0"
10'-0"
10'-0"
40 110.07'
110.03'
253.71'
253.72'
5'-0"
5'-0"
3'-0"
3'-0"
3'-0"
3'-0"
3'-0"
3'-0"
3'-0"
5'-0"
5'-0"
3'-0"
5'-0"
5'-0"
39 6'-0"
48 21
21 414141
4141
41 41
42 4242
42 4342
4242
45 44
45 45
46 22'-0"
20'-0"
60'-0"
RIGHT-OF-WAY
70'-0"
RIGHT-OF-WAY
30 47
16'-10"
15'-7"
12'-5"
3'-6" 2'-3"
9'-5" 19'-0"
1'-6" 2'-0"
45 11
3'-9"
12'-10"
49 23
11 1142
SCALE:
ARCHITECTURAL SITE PLAN
1"=10'-0"
0 5 10 20 30 50
PROJECT NO:
DATE DESCRIPTION
Q:\2022 Jobs\225684 - Nazareth Vista Mixed-Use\01-Planning App\2026-MMDD 4th PLANNING SUBMITTAL\225684-A101.dwg - Mar 25, 2026, 3:32pm - evans The "user(s)" in possession of this documentation acknowledge(s) thatARC TEC's and ARC TEC consultants' drawings, specifications, reports, electronic data and other documentation are instruments of service. ARC TEC and ARC TEC consultants shall be deemed the author and owner of such documentation. The "user(s)" in possession of this documentation shall not use or authorize any other person to use ARC TEC's or ARC TEC consultants' instruments of service. Reuse without ARC TEC's written authorization will be at the user(s) sole risk and without liability to ARC TEC and ARC TEC's consultants. The user(s) possessing this documentation shall indemnify and hold harmless ARC TEC and ARC TEC's consultants and agents and employees from and against all claims, damages losses and expenses, including but not limited to attorneys' fees, arising out of unauthorized reuse of ARC TEC o r ARC TEC' s c o n s u l t a n t s in s tr ume n t s o f s e r v i c e . Written dimensions on this drawing shall have precedence over any scaled dimension. DO NOT SCALE THIS DRAWING for accurate dimensions and notify ARC TEC of any discrepancies.
© Copyright ARC TEC, Inc. 2021
In Association with:
A R C T E C
ARCHITECTURAL TECHNOLOGI
www.arctecinc.com
Arizona
2960 East Northern Avenue, Building C
Phoenix, AZ 85028 602.953.2355
California
1731 Technology Drive, Suite 750
San Jose, CA 95110 408.496.0676
225684.11
A Planning Applicationt For:
NAZARETH VISTA
606 - 616 SOUTH B STREET
SAN MATEO, CA 94401
03.26.2025 SB330 APPLICATION04.30.2025 1ST PLANNING SUBMITTAL08.11.2025 2ND PLANNING SUBMITTAL12.16.2025 3RD PLANNING SUBMITTAL03.26.2026 4TH PLANNING SUBMITTAL PA-2024-039
12 A1.01
ARCHITECTURAL
SITE PLAN
PROJECT DATA . GENERAL PLAN REQUIREMENTS
ASSESSOR'S PARCEL NO.: 034-194-030
034-194-140
GENERAL PLAN: MIXED-USE MEDIUM II
SITE AREA: ±27,921 S.F. / 0.64 ACRES
ALLOWABLE MAX FAR (NON-RESIDENTIAL ONLY) 4.0 (111,684 S.F.) PROPOSED MAX FAR (NON-RESIDENTIAL ONLY) 0.7 (19,574 S.F.)DWELLING UNIT DENSITY (51-99 DU/ AC) 33 DU - 63 DU W/ 50% INCREASED STATE DENSITY 95 DU
LOT COVERAGE 100%
ALLOWABLE MAX. BUILDING HEIGHT 4 TO 6 STORIES
PROPOSED BUILDING HEIGHT 84'-10" (8 STORIES)
ZONING REQUIREMENTSZONING: C1-3/R5- CENTRAL BUSINESS SUPPORT SITE AREA: ±27,921 S.F. / 0.64 ACRES
ALLOWABLE MAX FAR (RESIDENTIAL + COMMERCIAL) 3.0 (83,763 S.F.) PROPOSED MAX FAR (RESIDENTIAL + COMMERCIAL) 3.6 (100,913 S.F.)MAX. DWELLING UNIT DENSITY (50 DU/AC) 32 DU W/ 50% INCREASED STATE DENSITY 48 DU
ALLOWABLE MAX. BUILDING HEIGHT 55'-0"
PROPOSED BUILDING HEIGHT 84'-10"PROPOSED BUILDING AREA (8-STORY BUILDING)RESIDENTIAL - LEVEL 01 5,584 S.F.PARKING GARAGE - LEVEL 01 12,288 S.F.RETAIL - LEVEL 01 7,286 S.F.PARKING GARAGE - LEVEL 02 24,459 S.F.PARKING GARAGE - LEVEL 03 24,459 S.F.RESIDENTIAL - LEVEL 04 18,147 S.F.RESIDENTIAL - LEVEL 05 18,147 S.F.RESIDENTIAL - LEVEL 06 18,147 S.F.RESIDENTIAL - LEVEL 07 18,147 S.F.RESIDENTIAL - LEVEL 08 15,455 S.F.
TOTAL BUILDING AREA 162,119 S.F.TOTAL RETAIL AREA (PROVIDED): 7,286 S.F.TOTAL PARKING AREA (PROVIDED): 61,206 S.F.TOTAL NON-COMMERCIAL AREA (PROVIDED): 93,627 S.F.# DWELLING UNITS PER FLOOR LEVEL 04 16 DULEVEL 05 20 DULEVEL 06 20 DULEVEL 07 20 DULEVEL 08 18 DU TOTAL # DWELLING UNITS 94 UNITS (OR 147 DU/ AC)
DWELLING UNIT MIX
STUDIO 42 DU (OR 45%)
ONE-BEDROOM 41 DU (OR 43%)
TWO-BEDROOM 11 DU (OR 12%)TOTAL # DWELLING UNITS 94 UNITS (OR 147 DU/ AC) BMR UNIT REQUIREMENTS - PER SDB ON BASE DENSITY (63 UNITS) 50% INCREASE: 15% VERY LOW INCOME 10 UNITS
MINIMUM BICYCLE PARKING
STALLS REQUIRED
(PER CITY OF SAN MATEO MUNICIPAL CODE SECTION 27.64.262
REQUIRED SHORT-TERM - RESIDENTIAL
STUDIO AND ONE-BEDROOM UNIT @ 0.05 SPACES PER UNIT83 UNITS x 0.05 = 4.65 SPACES TWO-BEDROOM UNIT @ 0.1 SPACES PER UNIT
11 UNITS x 0.10 = 1.1 SPACE
TOTAL REQUIRED SHORT-TERM - RESIDENTIAL: 5.75 SPACES OR 6 SPACES
REQUIRED LONG-TERM - RESIDENTIAL
STUDIO AND ONE-BEDROOM UNIT @ 1.0 SPACE PER UNIT83 UNITS x 1.0 =83 SPACES TWO-BEDROOM UNIT @ 1.25 SPACES PER UNIT
11 UNITS x 1.25 = 13.75 SPACES
TOTAL REQUIRED LONG-TERM - RESIDENTIAL: 96.75 SPACES OR 97 SPACES
REQUIRED SHORT-TERM - RETAIL
1 SPACE PER 2,000 S.F. OF RETAIL AREA
7,286 S.F. / 2,000 S.F. = 3.64 SPACES OR 4 SPACES
REQUIRED LONG-TERM - RETAIL
1 SPACE PER 12,000 S.F. OF RETAIL AREA
7,286 S.F. / 12,000 S.F. = 0.60 SPACES OR 1 SPACE
PROVIDED SHORT-TERM SPACESRESIDENTIAL 6 SPACESRETAIL 4 SPACES TOTAL 10 SPACES
PROVIDED LONG-TERM SPACES
RESIDENTIAL 97 SPACES (PROVIDED @ LEVEL 03)RETAIL 1 SPACE (PROVIDED @ LEVEL 01) TOTAL 98 SPACES
SITE PLAN NOTES
- REFER TO SHEET C2.01 AND C3.01 FOR ALL EXISTING AND PROPOSED
OBSTRUCTIONS ON SIDEWALKS AND CURBS INCLUDING BUT NOT LIMITED TO HYDRANTS, UTILITY METERS, UTILITY POLES AND STREETLIGHTS. - REFER TO SHEET C2.01 FOR ALL EXISTING EASEMENTS ON THE PROJECT.THERE ARE NO PROPOSED EASEMENTS AT THIS TIME.- REFER TO SHEET L0.1 FOR LOCATION, SPECIES AND SIZE OF ALL EXISTINGTREES NOTED TO BE REMOVED.- DEVELOPER TO PAY IN-LIEU FEE IN PLACE OF PROVIDING PUBLIC ARTWORK (PER SMMC 23.60).
TREE SPECIES
TREE 'T1' - 18" DBH LIQUIDAMBAR STYRACIFLUA - TO BE REMOVEDTREE 'T2' - 11" DBH LIQUIDAMBAR STYRACIFLUA - TO BE REMOVEDTREE 'T3' - 15" DBH LIQUIDAMBAR STYRACIFLUA - TO BE REMOVEDTREE 'T4' - 9" DBH LIQUIDAMBAR STYRACIFLUA - TO BE REMOVEDTREE 'T5' - 10" DBH LIQUIDAMBAR STYRACIFLUA - TO BE REMOVEDTREE 'T6' - 17" DBH MAGNOLIA GRANDIFLORA - TO BE REMOVEDTREE 'T7' - 16" DBH CINNAMOMUM CAMPHORA - OFF-SITE TREE TO REMAINTREE 'T8' - 14" DBH MAGNOLIA GRANDIFLORA - OFF-SITE TREE TO REMAINTREE 'T9' - 7" DBH ACER PALMATUM - OFF-SITE TREE TO REMAIN SPECIFIC TREE PROTECTION:
- REMOVE TREES T1, T2, T3, T4, T5 AND T6 AS DESIGNATED ON THE SITE PLAN AND ARBORIST REPORT.
- INSTALL TREE PROTECTION FENCING AROUND TREE T7.
1 EXISTING PROPERTY LINE
KEYNOTES .NOTE: NOT ALL KEYNOTES LISTED MAY APPLY TO THIS DRAWING. 23 VEHICLE ENTRY TO ON GRADE PARKING GARAGE w/ VISUAL AND AUDIBLE WARNINGS 4 SIDEWALK - REFER TO LANDSCAPE PLAN
56789
RAMP TO PARKING STRUCTURE w/TRANSITION SLOPE TOP & BOTTOM. PROVIDE VISUAL AND AUDIBLE ALARMS FOR PEDESTRIAN SAFETY.
10 ACCESSIBLE PATH OF TRAVEL SHOWN DASHED
1112
13 RETAIL ENTRYPRIMARY RESIDENTIAL ENTRYEGRESS DOOR
10'-0" x 10'-0" VISIBILITY TRIANGLES. NO OBSTRUCTION ABOVE 3'-0" OR BELOW 7'-0".
DASHED LINE INDICATES CANOPIES ABOVE
1415161718
SHORT-TERM BICYCLE RACKS
TRASH STAGING AND LOADING ZONE YELLOW PAINTED CURB (9'x32')
PARKING GARAGE EGRESS DOOR
LONG-TERM BIKE STORAGE (RETAIL)
6" DIAMETER STEEL BOLLARDS.
EXISTING TREE TO REMAIN - REFER TO ARBORIST REPORTEXISTING TREE TO BE REMOVED - REFER TO ARBORIST REPORT TREE PROTECTION FENCE. THE EXISTING STONE RETAINING WALL IS APPROX. 8FT. TALL AND PROVIDES ADEQUATE TREE PROTECTION TO ANY NEIGHBORING TREES. REFER TOARBORIST TREE PROTECTION PLAN. 19 4" WIDE PAINT CENTERLINE STRIPPING20 VISIBLE AND AUDIBLE WARNING DEVICE AT ENTRY 21 ACCESSIBLE PATH OF TRAVEL SHOWN DASHED22 BENCH - REFER TO LANDSCAPE PLAN23 STREET TREE AND TREE GRATE - REFER TO LANDSCAPE PLAN24 45'-0" x 45'-0" VISIBILITY TRIANGLE25 PLANTER - REFER TO LANDSCAPE PLAN26 FITNESS CENTER ENTRANCE27 FITNESS CENTER AREA - RESIDENT ONLY28 RESIDENTIAL LOBBY29 RETAIL AREA30 ADA CURB RAMP & TRUNCATED DOME PLATE31 GENERATOR ROOM32 TRASH ROOM33 DIRECTIONAL ARROWS34 PARKING STRIPING35 LEVEL 2 EV CHARGING STATION36 CONCRETE WHEEL STOP37 RETAIL/ VISITOR PARKING GARAGE38 INSTALL SIGN AT THE LOADING ZONE FOR NO STOPPING, STANDING OR PARKING AT ANY TIME BETWEEN 5:30AM AND 6:00PM OF ANY
DAY EXCEPT SUNDAY IN ADDITION TO THE YELLOW CURB
PARKING ANALYSIS
CALIFORNIA ASSEMBLY BILL (AB) 2097 PROHIBITS PUBLIC AGENCIES FROM
IMPOSING MINIMUM PARKING REQUIREMENTS ON RESIDENTIAL/ COMMERCIAL PROJECT LOCATED WITHIN ONE-HALF MILE OF A MAJOR TRANSIT STOPPARKING - PROVIDEDLEVEL 01 RETAIL - COMPACT 5 SPACESRETAIL - STANDARD 8 SPACESRETAIL - STANDARD/ EV CAPABLE 4 SPACESRETAIL - VAN ACCESSIBLE 1 SPACERETAIL - VAN ACCESSIBLE/ LEVEL 2 EVCS 1 SPACERETAIL - STANDARD ACCESSIBLE/ LEVEL 2 EVCS 1 SPACERETAIL - STANDARD/ LEVEL 2 EVCS 1 SPACE TOTAL RETAIL PARKING LEVEL01 - PROVIDED 21 SPACES
LEVEL 02RESIDENTIAL - TANDEM (COMPACT)/ EV READY 1 SPACERESIDENTIAL - TANDEM (STANDARD)/ EV READY 1 SPACERESIDENTIAL - COMPACT/ EV READY 12 SPACESRESIDENTIAL - STANDARD/ EV READY 22 SPACESRESIDENTIAL - COMPACT/ LEVEL2 EVCS 4 SPACESRESIDENTIAL - STANDARD/ LEVEL2 EVCS 4 SPACESRESIDENTIAL - STANDARD ACCESSIBLE 1 SPACERESIDENTIAL - VAN ACCESSIBLE 1 SPACERESIDENTIAL - STANDARD ACCESSIBLE/ LEVEL 2 EVCS 0 SPACERESIDENTIAL - VAN ACCESSIBLE/ LEVEL 2 EVCS 0 SPACE TOTAL RESIDENTIAL PARKING LEVEL 02 - PROVIDED 46 SPACES LEVEL 03RESIDENTIAL - TANDEM (COMPACT)/ EV READY 1 SPACERESIDENTIAL - TANDEM (STANDARD)/ EV READY 1 SPACERESIDENTIAL - COMPACT/ EV READY 12 SPACESRESIDENTIAL - STANDARD/ EV READY 27 SPACESRESIDENTIAL - COMPACT/ LEVEL 2 EV EVCS 4 SPACESRESIDENTIAL - STANDARD/ LEVEL 2 EV EVCS 0 SPACERESIDENTIAL - STANDARD ACCESSIBLE 0 SPACERESIDENTIAL - VAN ACCESSIBLE 0 SPACERESIDENTIAL - STANDARD ACCESSIBLE/ LEVEL 2 EVCS 1 SPACERESIDENTIAL - VAN ACCESSIBLE/ LEVEL 2 EVCS 1 SPACE TOTAL RESIDENTIAL PARKING LEVEL 03 - PROVIDED 47 SPACESTOTAL RETAIL/ VISITOR PARKING (LEVEL 01) - PROVIDED 21 SPACESTOTAL RESIDENTIAL PARKING (LEVELS 02 & 03) - PROVIDED 93 SPACES 3940 ABOVE-GROUND TRANSFORMER
21FT SETBACK
48 PROPOSED 6FT WIDE SIDEWALK EASEMENT
41 EXISTING BUILDING STRUCTURE
42 RED PAINTED CURB43 YELLOW PAINTED CURB (LOADING AND TRASH STAGING ZONE)44 EXISTING FIRE HYDRANT45 PROPOSED FIRE HYDRANT
CITY OF SAN MATEO PARKING SIGN TO BE RELOCATED OUTSIDEOF DRIVEWAY APRON 4647 STREET LIGHT49 SEATING AREA - REFER TO LANDSCAPE PLAN FOR FURNITURE SPECS 2 3
2 2
3 3
3 3
387 of 786
19'-0"
25'-2"
8'-11" 14'-9" 1'-6" 6'-0"
5'-2"
1'-5"
1'-5" 1'-5"
1'-5"
11" 4"
4"
4" 11"
1'-1"
1'-9" 6'-0"
18'-0" MIN. 12'-0" MIN. 5'-0" MIN. VAN 1. ALL PARKING SPACES AND ACCESS AISLE SHALL HAVE A MAXIMUM SLOPE IN ALL DIRECTIONS OF 1:48. 2. PEDESTRIAN WAYS WHICH ARE ACCESSIBLE TO PERSONS WITH DISABILITIES SHALL BE PROVIDED FROM EACH ACCESSIBLE SPACE TO RELATED FACILITIES. REFER TO SITE PLAN FOR LOCATION OF ACCESSIBLE PATH OF TRAVEL LINKING ACCESS AISLE TO RELATED FACILITIES. 3. ACCESS AISLE MAY BE SHARED BY TANDEM SPACES. IF ONE SPACE IS VAN ACCESSIBLE, THE ACCESS AISLE MUST BE ON THE PASSENGER SIDE OF SPACE. 4. VAN PARKING (CONFIGURATION A) SHALL BE PERMITTED TO BE 108" (9'-0") WIDE MINIMUM WHERE THE ACCESS AISLE IS 96" (8'-0") WIDE MINIMUM. ACCESS AISLE FOR VAN ACCESSIBLE PARKING SHALL BE ON THE PASSENGER SIDE. 5. WHEN NO CURB OR BARRIER IS PROVIDED AT THE FRONT OF STALL AND THERE IS A WALKWAY IN FRONT OF THE STALL, A WHEEL STOP IS REQUIRED WHICH WILL PREVENT ENCROACHMENT OF CARS OVER WALKWAYS. SIGN (TYPICAL); SEE 8A FOR STANDARD SPACE SIGN AND 8B/- FOR VAN SPACE SIGN 3'-0"
2'-0" 6" PRECAST CONCRETE WHEEL STOP WHERE REQUIRED 4" WIDE DIAGONAL STRIPING, WHITE OR BLUE ACCESSIBLE PARKING SYMBOL; SEE 2/- 12" HIGH WHITE LETTERING IN ACCESS AISLE SCALE: ACCESSIBLE PARKING SPACES 1/8" = 1'-0" 9'-0" MIN. 4" WIDE BLUE STRIPING AT PERIMETER OF ACCESS AISLE SCALE: ACCESSIBLE PARKING SIGNAGE & UNAUTHORIZED VEHICLE SIGNAGE 1 1/2"=1'-0" UNAUTHORIZED VEHICLES PARKED IN DESIGNATED ACCESSIBLE SPACES NOT DISPLAYING DISTINGUISHING PLACARDS OR SPECIAL LICENSE PLATES ISSUED FOR PERSONS WITH DISABILITIES WILL BE TOWED AWAY AT THE OWNER'S EXPENSE. TOWED VEHICLES MAY BE RECLAIMED AT: OR BY TELEPHONING. INSERT ADDRESS INSERT TELEPHONE NUMBER SIGN TYPE A: ACCESSIBLE CAR PARKING SPACE IDENTIFICATION SIGN TYPE B: ACCESSIBLE VAN PARKING SPACE IDENTIFICATION SIGN TYPE C: UNAUTHORIZED VEHICLE WARNING SIGN ACCESSIBLE PARKING IDENTIFICATION SIGNAGE 1. REFLECTORIZED PORCELAIN FINISH ON STEEL WITH BEADED TEXT OR EQUAL 2. LETTERS AND SYMBOLS TO BE WHITE ON A DARK BLUE BACKGROUND 3. SIGN TO BE CENTERED AT THE INTERIOR END OF PARKING SPACE 4. CORNERS OF SIGN TO BE RADIUSED 1/2" MINIMUM. THIS PORTION OF SIGN TO BE 70 SQUARE INCHES MINIMUM (TYPICAL) BOTTOM OF SIGNAGE: WHEN SIGN IS LOCATED IN A PATH OF TRAVEL, BOTTOM OF SIGN SHALL BE A MINIMUM OF 6'-8" ABOVE THE WALKING SURFACE. WHEN LOCATED IN A LANDSCAPE AREA OR ON A WALL AT THE END OF THE SPACE, THE BOTTOM OF SIGN SHALL BE AT 5'-0" ABOVE ADJACENT GRADE 17" MINIMUM 18" RECOMMENDED 22" MINIMUM
24" RECOMMENDED UNAUTHORIZED VEHICLE WARNING SIGNAGE SHALL BE POSTED EITHER: 1. IN A CONSPICUOUS PLACE AT EACH ENTRANCE TO AN OFF-STREET PARKING FACILITY, OR 2. IMMEDIATELY ADJACENT TO ON-SITE ACCESSIBLE PARKING AND VISIBLE FROM EACH PARKING SPACE. THE PHONE NUMBER OR ADDRESS WHERE TOWED VEHICLES CAN BE RECLAIMED IS POSTED IN THE APPROPRIATE LOCATION ON THE SIGN AND IS A PERMANENT PART OF THE SIGN. LETTERING SHALL BE A MINIMUM OF 1" IN HEIGHT. SINGLE RAMP, STRAIGHT SIDES WHERE PLANTING AREA ADJOINS RAMP A DETECTABLE WARNING SURFACE AT THE LOWER 3'-0" OF THE RAMP, FULL WIDTH OF RAMP; SEE 'D' 6" WIDE CONCRETE CURB AT EACH SIDE OF RAMP FROM TOP OF RAMP TO BOTTOM EDGE OF RAMP 2.30" - 2.40"
2.30" - 2.40" SECTION THROUGH DOME 0.45" - 0.47" AT TOP 0.90" - 0.92" AT BASE
0.18" -0.20" DETECTABLE WARNING SURFACE . TRUNCATED DOME PATTERN SHALL BE SQUARE IN THE DIRECTION OF TRAVEL
C PARALLEL RAMP
D DETECTABLE WARNING SURFACE AT THE LANDING; 3'-0" DEEP X FULL WIDTH OF LANDING ADJACENT TO PAVING. SEE 'D' FOR DOME PATTERN 6" WIDE CONCRETE CURB AT BACK SIDE, TOP OF RAMP TO TOP OF RAMP SINGLE RAMP; FLARED SIDES WHERE WALKING SURFACE ADJOINS RAMP B DETECTABLE WARNING SURFACE AT THE LOWER 3'-0" OF THE RAMP, FULL WIDTH OF RAMP; SEE 'D' TAPERED SIDES; SLOPE 1 : 10 MAXIMUM SCALE: CURB RAMP CONFIGURATION N.T.S 6" WIDE CONCRETE CURB AT FRONT SIDE OF RAMP FROM TOP OF RAMP TO BOTTOM EDGE OF RAMP PLAN RAMP NOTES . 1. Concrete walk and ramp shall be min. 4" deep with 6x6x WWM centered in slab over compacted fill with 8" turndown at sides and adjacent to pavement. 2. Ramps shall have a maximum running slope of 1:12 in the direction of travel of the sidewalk and maximum cross slope of 1:48. 3. 48" long landings that slope maximum 1:48 in all directions shall be provided at the tops of curb ramps and blended transitions. When located in roadways, the bottom landings of curb ramps shall have counter slopes of maximum 5.0% within 24" of the curb. Grade breaks at both the top and bottom of curb ramps shall be perpendicular to the direction of the ramp run. 4. Blended transitions shall have a running slope not steeper than 1:20. 5. Detectable warning surfaces shall be integrally colored. On ramp surface, the color shall provide a 70% visual contrast to adjacent walking surfaces. Detectable warning surface at landings shall be OSHA yellow. Warning surface shall differ from adjoining surfaces in resiliencey or sound-on-cane contact. 3'-0" 3'-0" NOTE: THE CENTERLINE OF THE SYMBOL SHALL BE A MAXIMUM OF 6" FROM THE CENTERLINE OF THE PARKING SPACE, IT'S SIDES PARALLEL TO THE LENGTH OF THE STALL AND ITS LOWER CORNER AT, OR LOWER SIDE ALIGNED WITH, THE END OF THE PARKING STALL (CBC 11B-502.6.4.1) PAINT SYMBOL WITH TWO COATS HEAVY DUTY WHITE TRAFFIC PAINT BACKGROUND TO BE TWO COATS HEAVY DUTY BLUE TRAFFIC PAINT SCALE: ACCESSIBILITY PARKING SYMBOL N.T.S. OPTIONAL WHITE BORDER MUST BE OUTSIDE THE 3'-0" X 3'-0" BLUE SQUARE SCALE: EV PARKING STALL SYMBOL 1/2" = 1'-0" 3'-0" ALIGN ALIGN PARKING STALL STRIPEELECTRIC VEHICLE STATION PARKING SYMBOL STENCIL, WHITE REFLECTORIZED PAINT ON GREEN BACKGROUND 9'-0" 3'-0" EQ. EQ. SCALE: ELECTRIC VEHICLE CHARGING STATION SIGNAGE 1 1/2"=1'-0" ELECTRIC VEHICLE CHARGING STATION SPACE IDENTIFICATION 1'-0" 1'-6" 1 1/2" WHITE LETTERING ON GREEN BACKGROUND GREEN BORDER 1 1/2" GREEN LETTERING ON WHITE BACKGROUND 7"
1 1
2 " 1" 1
1 2
" 1
1 2
" 1
1 2
" 11"
1 1
2 "1"1
1 2
"1"1
1 2
"1"1
1 2
" 3
4 " 1
1 4
" BOTTOM OF SIGNAGE: WHEN SIGN IS LOCATED IN A PATH OF TRAVEL, BOTTOM OF SIGN SHALL BE A MINIMUM OF 6'-8" ABOVE THE WALKING SURFACE. WHEN LOCATED IN A LANDSCAPE AREA OR ON A WALL AT THE END OF THE SPACE, THE BOTTOM OF SIGN SHALL BE AT 5'-0" ABOVE ADJACENT GRADE WELLE CIRCULAR RACK, INGROUND, IN STAINLESS STEEL (PRODUCT REFERENCE: WCR02-SF-P) CONCRETE SIDEWALK IN-GROUND EMBEDDED INSTALLATION PER MANUFACTURER'S INSTRUCTIONS FINISHED INSTALLATION HEIGHT: 32" 3'-0"
2'-6"
4"
2'-6"
5'-4" IN SOLID BLOCK LETTERING 2'-0" HIGH CENTERED ON DIRECTIONAL ARROW INDICATING "IN" OR "OUT" AT ENTRANCE(S) AND EXIT(S) ONLY 6" 9" 9" 6" 2'-6" 2'-6"
4"
2'-6"
5'-4" 9" 9" 6" 6" 2'-6" TRUNCATED DOME SURFACES ARE REQUIRED IN THE FOLLOWING LOCATIONS: · WALKWAYS CROSSING VEHICULAR WAYS WITH SLOPES BETWEEN 5% (1 : 20) AND 6.67% (1 : 15): FULL SURFACE OF THE RAMP SHALL HAVE TRUNCATED DOMES · WALKWAYS CROSSING VEHICULAR WAYS WITH SLOPES BETWEEN 6.67% (1 : 15) AND (8.5% 1 : 12): 3' WIDE X (WIDTH OF SIDEWALK) AREA OF TRUNCATED DOMES· THE TRUNCATED DOME SURFACE DOES NOT NEED TO BE YELLOW, IT ONLY NEEDS TO CONTRAST VISUALLY WITH ADJACENT SURFACES, AND IT MUST BE INTEGRALLY COLORED. DOME PATTERN 2.35"
2.35" SECTION THROUGH DOME 0.9" 0.45"
0.2" 3'-0" / 6'-0" LONG PRECAST CONCRETE WHEEL STOP; SEE SITE PLAN FOR LOCATION. #4 BAR X 1'-0" AT EA. END LOCATION CONC. PAVING SLAB ON GRADE 2'-0" TO END OF STALL #3 BAR X 5'-8" @ 6'-0" LONG STOP #3 BAR X 2'-8" @ 3'-0" LONG STOP 3'-0" / 6'-0" LONG PRECAST CONCRETE WHEEL STOP (GLUE DOWN TYPE); SEE SITE PLAN FOR LOCATION. EPOXY ADHESIVE AND ATTACHMENTS PER WHEEL STOP MANUF. CONC. PARKING DECK 2'-0" TO END OF STALL A AT SLAB ABOVE GRADE LEVELB AT SLAB ON GRADE PARKING STRIPING (WHERE OCCURS). FUTURE CHARGING WALL MOUNTED STATION SHOWN DASHED SLEEVE FOR CONDUIT STUB-UP, CENTER ON PARKING STRIPING AS INDICATED (WHERE OCCURS); PROVIDE CAP AT CONDUIT CONCRETE WALL OF PARKING GARAGE. 16'-0" MIN.
15'-0" MIN. FOR COMPACT 4-INCH WIDE STRIPES
2'-0"
24'-0" MIN. DRIVE AISLE
(NOT TO SCALE) CLEAN AIR/EV CAV /EV PARKING PAINTED SIGNAGE (WHERE OCCURS; REFER TO PARKING GARAGE PLANS). SEE DETAIL 7/A1.02. RESERVED PARKING SIGN CENTERED ON STALL WHERE OCCURS. SEE DETAILS 6 AND 8/A1.02. 8'-6" MIN./ 8'-0" MIN. COMPACT 9'-0" MIN./ 8'-6" MIN. COMPACT 9'-0" MIN./ 8'-6" MIN. COMPACT R9" 1'-6" TYP. WALL OR OTHER OBSTRUCTION STRUCTURAL COLUMN CONCRETE CURB, SEE DET. 13B/A1.02 PARKING STRIPING PER SAN MATEO ORDINANCE 2" 2'-10" 8"
3'-0" MIN.
3 3
4 " MAX. 4'-0" MAX.
3 7
8 " MAX. 1
4" X 2" FLAT BAR KICK PLATE SECTION ELEVATION PLAN MANUFACTURER: PACIFIC STAIR CORPORATION MODEL: STANDARD GUARD RAIL WITH HANDRAIL - ROD R737 1. POST AND TOP LINE MATERIAL TO BE 3 4" X 2" FLAT BAR 2. HANDRAIL MATERIAL TO BE 1 1
2" DIAMETER (1.66" O.D.) PIPE 3. ROD MATERIAL TO BE 1
2" ROUND BAR NOTE: SEE SHEET A3.06 FOR BALCONY RAILING COLOR SPECIFICATION. SCALE: PARKING STALL STRIPING 1/8"=1'-0" SCALE: CONCRETE CURB 1 1/2"=1'-0" A1.02 SITE DETAILS 1 23
5678
91012 1314 1718 PROJECT NO: DATE DESCRIPTION
Q:\2022 Jobs\225684 - Nazareth Vista Mixed-Use\01-Planning App\2025-MMDD 3RD PLANNING SUBMITTAL\225684-A102.dwg - Dec 22, 2025, 1:02pm - josephinek The "user(s)" in possession of this documentation acknowledge(s) that ARC TEC's and ARC TEC consultants' drawings, specifications, reports, electronic data and other documentation are instruments of service. ARC TEC and ARC TEC consultants shall be deemed the author and owner of suchdocumentation. The "user(s)" in possession of this documentation shall not use or authorize any other person to use ARC TEC's or ARC TEC consultants' instruments of service. Reuse without ARC TEC's written authorization will beat the user(s) sole risk and without liability to ARC TEC and ARC TEC's consultants. The user(s) possessing this documentation shall indemnify and hold harmless ARC TEC and ARC TEC's consultants and agents and employees from and against all claims, damages losses and expenses, including but not limited to attorneys' fees, arising out of unauthorized reuse of ARC TEC o r ARC TEC' s c o n s u l t a n t s i n s tr ume n t s o f s e r v i c e . Written dimensions on this drawing shall have precedence over any scaled dimension. DO NOT SCALE THIS DRAWING for accurate dimensions and notify ARC TEC of any discrepancies. © Copyright ARC TEC, Inc. 2021 In Association with: A R C T E C ARCHITECTURAL TECHNOLOGIES www.arctecinc.com Arizona 2960 East Northern Avenue, Building C Phoenix, AZ 85028 602.953.2355 California 1731 Technology Drive, Suite 750 San Jose, CA 95110 408.496.0676 225684.11 A Planning Applicationt For:
NAZARETH VISTA
606 - 616 SOUTH B STREET
SAN MATEO, CA 94401 03.26.2025 SB330 APPLICATION 04.30.2025 1ST PLANNING SUBMITTAL 08.11.2025 2ND PLANNING SUBMITTAL 12.16.2025 3RD PLANNING SUBMITTAL PA-2024-039 12 SCALE: DIRECTIONAL ARROW 1/2"=1'-0" SCALE: DERO BIKE RACK FILE 1/4"=1'-0" SCALE: SHORT_TERM BIKE RACK 1"=1'-0" SCALE: TRUNCATED DOMES 3"=1'-0" DERO DECKER: 97 BIKES SCALE: FUTURE EV CHARGING STUB OUT 1"=1'-0" SCALE: RESIDENTIAL BALCONY GUARD RAIL 1/2"=1'-0" 2 388 of 786
PROJECT NO: DATE DESCRIPTION
Q:\2022 Jobs\225684 - Nazareth Vista Mixed-Use\01-Planning App\2025-MMDD 3RD PLANNING SUBMITTAL\225684-A111.dwg - Dec 22, 2025, 1:02pm - josephinek The "user(s)" in possession of this documentation acknowledge(s) that ARC TEC's and ARC TEC consultants' drawings, specifications, reports, electronic data and other documentation are instruments of service. ARC TEC and ARC TEC consultants shall be deemed the author and owner of such documentation. The "user(s)" in possession of this documentation shall not use or authorize any other person to use ARC TEC's or ARC TEC consultants' instruments of service. Reuse without ARC TEC's written authorization will be at the user(s) sole risk and without liability to ARC TEC and ARC TEC's consultants. The user(s) possessing this documentation shall indemnify and hold harmless ARC TEC and ARC TEC's consultants and agents and employees from and against all claims, damages losses and expenses, including but not limited to attorneys' fees, arising out of unauthorized reuse of ARC TEC o r ARC TEC' s c o n s u l t a n t s i n s tr ume n t s o f s e r v i c e . Written dimensions on this drawing shall have precedence over any scaled dimension. DO NOT SCALE THIS DRAWING for accurate dimensions and notify ARC TEC of any discrepancies. © Copyright ARC TEC, Inc. 2021 In Association with: A R C T E C ARCHITECTURAL TECHNOLOGIES www.arctecinc.com Arizona 2960 East Northern Avenue, Building C Phoenix, AZ 85028 602.953.2355 California 1731 Technology Drive, Suite 750 San Jose, CA 95110 408.496.0676 225684.11 A Planning Applicationt For:
NAZARETH VISTA
606 - 616 SOUTH B STREET
SAN MATEO, CA 94401 03.26.2025 SB330 APPLICATION 04.30.2025 1ST PLANNING SUBMITTAL 08.11.2025 2ND PLANNING SUBMITTAL 12.16.2025 3RD PLANNING SUBMITTAL PA-2024-039 12 A1.11 SOLAR SHADOW STUDY SCALE: WINTER SOLSTICE - 9 AMN.T.S 13 SCALE: WINTER SOLSTICE - 12 PMN.T.S 14 SCALE: WINTER SOLSTICE - 4 PMN.T.S 16 SCALE: AUTUMN EQUINOX - 9 AMN.T.S 9 SCALE: AUTUMN EQUINOX - 12 PMN.T.S 10 SCALE: AUTUMN EQUINOX - 2 PMN.T.S 11 SCALE: AUTUMN EQUINOX - 4 PMN.T.S 12 SCALE: SUMMER SOLSTICE - 9 AMN.T.S 5 SCALE: SUMMER SOLSTICE - 12 PMN.T.S 6 SCALE: SUMMER SOLSTICE - 4 PMN.T.S 8 SCALE: SPRING EQUINOX - 9 AMN.T.S 1 SCALE: SPRING EQUINOX - 12 PMN.T.S 2 SCALE: SPRING EQUINOX - 2 PMN.T.S 3 SCALE: SPRING EQUINOX - 4 PMN.T.S 4 389 of 786 NO
PARKING
NO
PARKING
UP 20%
VAN
EV CAPABLE COMPACT COMPACT COMPACT
COMPACT
TURN
AROUND
UP
A
1 B C D E F G H K
245
2.22.5 C.1
2.7 3
B.3 B.5 J
1 A4.11
2 A3.15
1 A3.16
1 A3.15
2 A3.16
4.5 A.6 B.6 B.6 D.4 F.6 G.4 H.2 J.1
10'-11" 6'-1" 7'-6" 5'-6" 6'-1" 8'-11" 6'-0" 9'-0" 12'-6" 11'-4" 16'-2" 27'-6" 15'-4" 12'-2" 11'-10" 16'-8" 7'-3" 22'-3" 2'-11" 11'-1" 227'-0"
15'-11" 10'-7" 8'-1" 8'-2" 32'-0" 14'-9" 12'-3"
102'-11"
2 A4.11
2.4 EV CAPABLE
LEVEL 2 EVCS
VAN
ACCESSIBLE
UP 10%
EV CAPABLE EV CAPABLE
DN 6.0%
DN 5.0%
DN
5.0%
DN 5.0%
COMPACT COMPACT
UP
12 9 9 1
TYP.
8 TYP.
2 2 7 2
TYP.
11 TYP.
20 16
25 7
TYP.
2614
4 14
27 28
29 30
31 TYP.
33 32
23 18
TYP.
7 TYP.
9 TYP.
3 5
7 TYP.
34 TYP. 35
TYP.
1 36
37 38
8'-9" 8'-6" 8'-3" 8'-9" 8'-6" 8'-3" 8'-9" 8'-6" 8'-3" 8'-9" 8'-6" 8'-3" 8'-6" 9'-0" 8'-6" 9'-0" 8'-6" 9'-0" 8'-6" 9'-0" 9'-6" 9'-0"
8'-6" 8'-6" 8'-6"
8'-9" 8'-9" 12'-3"
24'-0" 18'-0" 18'-0" 4445 46 TYP.
+0'-0" A.F.F.T.O. SLAB
47 4445
48 25'-0"
24'-0"
5'-0" 12'-0" 5'-0" 12'-0" 8'-6" 8'-6" 8'-6"
8'-9" 8'-9"
SCALE:
FLOOR PLAN - LEVEL 01
3/32" = 1'-0"
0 5 10 20 30 50 70
PROJECT NO:
DATE DESCRIPTION
Q:\2022 Jobs\225684 - Nazareth Vista Mixed-Use\01-Planning App\2026-MMDD 4th PLANNING SUBMITTAL\225684-A211.dwg - Mar 25, 2026, 3:32pm - evans The "user(s)" in possession of this documentation acknowledge(s) thatARC TEC's and ARC TEC consultants' drawings, specifications, reports, electronic data and other documentation are instruments of service. ARC TEC and ARC TEC consultants shall be deemed the author and owner of suchdocumentation. The "user(s)" in possession of this documentation shall not use or authorize any other person to use ARC TEC's or ARC TEC consultants' instruments of service. Reuse without ARC TEC's written authorization will be at the user(s) sole risk and without liability to ARC TEC and ARC TEC's consultants. The user(s) possessing this documentation shall indemnify and hold harmless ARC TEC and ARC TEC's consultants and agents and employees from and against all claims, damages losses and expenses, including but not limited to attorneys' fees, arising out of unauthorized reuse of ARC TEC o r ARC TEC' s c o n su lt a n t s i n s tr ume n t s o f s e r v i c e . Written dimensions on this drawing shall have precedence over any scaleddimension. DO NOT SCALE THIS DRAWING for accurate dimensions and notify ARC TEC of any discrepancies.
© Copyright ARC TEC, Inc. 2021
In Association with:
A R C T E C
ARCHITECTURAL TECHNOLOGIES
www.arctecinc.com
Arizona
2960 East Northern Avenue, Building C
Phoenix, AZ 85028 602.953.2355
California
1731 Technology Drive, Suite 750
San Jose, CA 95110 408.496.0676
225684.11
A Planning Applicationt For:
NAZARETH VISTA
606 - 616 SOUTH B STREET
SAN MATEO, CA 94401
03.26.2025 SB330 APPLICATION04.30.2025 1ST PLANNING SUBMITTAL08.11.2025 2ND PLANNING SUBMITTAL12.16.2025 3RD PLANNING SUBMITTAL03.26.2026 4TH PLANNING SUBMITTAL PA-2024-039
12 A2.11
FLOOR PLAN - LEVEL 01
1 EXISTING PROPERTY LINE
KEYNOTES - FLOOR PLAN . NOTE: NOT ALL KEYNOTES LISTED MAY APPLY TO THIS DRAWING. 23 PRIMARY RETAIL ENTRANCE
4 PRIMARY RESIDENTIAL ENTRANCE
56789
SERVICE DOOR
10 ACCESS RAMP TO PARKING STRUCTURE W/ TRANSITION SLOPE
TOP BOTTOM SIDEWALK
11 2-HR FIRE RATED WALLS AT TRASH CHUTTE
EXTERIOR WALLS - REFER TO EXTERIOR ELEVATIONS
CANOPY ABOVE (SHOWN DASHED)CANOPY BELOW
EXTERIOR ALUM./ GLASS STOREFRONT WINDOW SYSTEM
STRUCTURAL COLUMN
12 2HR. MECHANICAL SHAFT13 42" HIGH GUARDRAIL AT RESIDENTIAL COMMON AREA14 EGRESS DOOR15 RESIDENTIAL DWELLING UNIT (TYP.)16 RETAIL/ VISITOR PARKING17 42"H. AFF PARAPET WALL18 66"H. PRIVACY SCREEN19 PRIVATE BALCONY ABOVE (SHOWN DASHED)20 EXTERIOR SLIDING GLASS DOOR 21 1HR FIRE RATED DEMISING WALL AT DWELLING UNIT22 1HR FIRE RATED WALL AT HALLWAY23 2HR FIRE RATED WALL AT STAIRS, ELEVATORS AND TRASH CHUTE24 PRIVATE RESIDENTIAL BALCONY WITH 42" H. GUARDRAIL25 FITNESS CENTER ENTRANCE - FOR RESIDENT ONLY26 VISITOR/ RETAIL PARKING ENTRANCE27 TRASH ROOM28 6" CONCRETE CURB29 DIRECTIONAL MARKING30 PARKING STRIPPING31 5FT WIDE ACCESSIBLE AISLE32 BOLLARDS33 LONG-TERM BIKE LOCKER (RETAIL)34 ELECTRIC VEHICLE CHARGING STATION35 CONCRETE WHEEL STOP36 FITNESS CENTER - RESIDENT ONLY37 RESIDENTIAL LOBBY38 RESIDENTIAL ELEVATORS39 RESIDENTIAL COMMON AREA (OUTDOOR)40 42" H. PARAPET WALL AT RESIDENTIAL PRIVATE BALCONY41 RESIDENTIAL PARKING42 MOTORCYCLE PARKING43 RESIDENTIAL LONG-TERM BIKE STORAGE REFER TO SHEET A1.02 FOR ENLARGED PLAN AND MANUFACTURER SPECIFICATIONS. PROVIDE ELECTRICAL OUTLETS FOR E-BIKE CHARGERS 4445
CLEARANCE BAR ABOVE (SHOWN DASHED)
MOTORIZED SECURITY GRILLE
46 ACCESSIBLE PATH OF TRAVEL47 ELECTRICAL ROOM TO INCLUDE CITY RADIO COMMUNICATION EQUIPMENT AND ALL SUPPORTING EQUIPMENT.
48 4" WIDE PAINT CENTERLINE STRIPPING
EV PARKING ANALYSIS TABLE - PROVIDED
RETAIL/ VISITOR USE TOTAL NUMBER OF STALLS 21
TOTAL NUMBER OF LEVEL 2 EVCS STALLS 10% or 2
TOTAL NUMBER OF LEVEL 2 EV CAPABLE STALLS 10% or 2
RESIDENTIAL USE TOTAL NUMBER OF STALLS 93
TOTAL NUMBER OF LEVEL 2 EVCS STALLS (15%) 14
TOTAL NUMBER OF LEVEL 2 EV READY STALLS (85%) 79
93 2% OR 2
COMPLIANT MINIMUM REQUIRED TOTAL PARKING SPACES
REQUIRED NUMBER OF ACCESSIBLE PARKING STALLS
RESIDENTIAL (CBC 1109A.3)
EV NOTES:
1. EV AND EVSE PER SAN MATEO GREEN BUILDING
REACH CODES, ACTIVE JAN. 1, 2023.
2. PER CALGREEN 2022 TABLE 5.106.5.3.1
1-25 1
COMPLIANT MINIMUM REQUIRED TOTAL PARKING SPACES
REQUIRED NUMBER OF ACCESSIBLE PARKING STALLS
(CBC TABLE 11B-208.2)
YES
RETAIL
YES
Parking Provided
Use Short-Term Bike Long-Term Bike Bike Total Standard Compact Standard
(Tandem)/ Level
2 EV Ready
Compact
(Tandem)/ Level
2 EV Ready
Standard
Accessible
Standard
Accessible Level
2 EVCS
Van Accessible Van Accessible Level 2 EVCS Standard Level 2 EV Capable Standard Level 2 EVCS Standard Level 2 EV Ready Compact Level 2 EVCS Compact Level 2 EV Ready Parking Provided Level 1 - Retail/ Visitors 4 1 7 8 5 1 1 1 4 1 21Level 1 - Residential 6 6Level 2 - Residential 1 1 1 1 4 22 4 12 46Level 3 - Residential 97 97 1 1 1 1 27 4 12 47 Total Parking Provided 10 98 114
MINIMUM BICYCLE PARKING
STALLS REQUIRED
(PER CITY OF SAN MATEO MUNICIPAL CODE SECTION 27.64.262
REQUIRED SHORT-TERM - RESIDENTIAL
STUDIO AND ONE-BEDROOM UNIT @ 0.05 SPACES PER UNIT83 UNITS x 0.05 = 4.65 SPACES TWO-BEDROOM UNIT @ 0.1 SPACES PER UNIT
11 UNITS x 0.10 = 1.1 SPACE
TOTAL REQUIRED SHORT-TERM - RESIDENTIAL: 5.75 SPACES OR 6 SPACES
REQUIRED LONG-TERM - RESIDENTIAL
STUDIO AND ONE-BEDROOM UNIT @ 1.0 SPACE PER UNIT83 UNITS x 1.0 =83 SPACES TWO-BEDROOM UNIT @ 1.25 SPACES PER UNIT
11 UNITS x 1.25 = 13.75 SPACES
TOTAL REQUIRED LONG-TERM - RESIDENTIAL: 96.75 SPACES OR 97 SPACES
REQUIRED SHORT-TERM - RETAIL
1 SPACE PER 2,000 S.F. OF RETAIL AREA
7,286 S.F. / 2,000 S.F. = 3.64 SPACES OR 4 SPACES
REQUIRED LONG-TERM - RETAIL
1 SPACE PER 12,000 S.F. OF RETAIL AREA
7,286 S.F. / 12,000 S.F. = 0.60 SPACES OR 1 SPACE
PROVIDED SHORT-TERM SPACESRESIDENTIAL 6 SPACESRETAIL 4 SPACES TOTAL 10 SPACES
PROVIDED LONG-TERM SPACES
RESIDENTIAL 97 SPACES (PROVIDED @ LEVEL 03)RETAIL 1 SPACE (PROVIDED @ LEVEL 01) TOTAL 98 SPACES
1 1
1 1
PARKING ANALYSIS
CALIFORNIA ASSEMBLY BILL (AB) 2097 PROHIBITS PUBLIC AGENCIES FROM
IMPOSING MINIMUM PARKING REQUIREMENTS ON RESIDENTIAL/ COMMERCIAL PROJECT LOCATED WITHIN ONE-HALF MILE OF A MAJOR TRANSIT STOPPARKING - PROVIDEDLEVEL 01 RETAIL - COMPACT 5 SPACESRETAIL - STANDARD 8 SPACESRETAIL - STANDARD/ EV CAPABLE 4 SPACESRETAIL - VAN ACCESSIBLE 1 SPACERETAIL - VAN ACCESSIBLE/ LEVEL 2 EVCS 1 SPACERETAIL - STANDARD ACCESSIBLE/ LEVEL 2 EVCS 1 SPACERETAIL - STANDARD/ LEVEL 2 EVCS 1 SPACE TOTAL RETAIL PARKING LEVEL01 - PROVIDED 21 SPACES
LEVEL 02RESIDENTIAL - TANDEM (COMPACT)/ EV READY 1 SPACERESIDENTIAL - TANDEM (STANDARD)/ EV READY 1 SPACERESIDENTIAL - COMPACT/ EV READY 12 SPACESRESIDENTIAL - STANDARD/ EV READY 22 SPACESRESIDENTIAL - COMPACT/ LEVEL2 EVCS 4 SPACESRESIDENTIAL - STANDARD/ LEVEL2 EVCS 4 SPACESRESIDENTIAL - STANDARD ACCESSIBLE 1 SPACERESIDENTIAL - VAN ACCESSIBLE 1 SPACERESIDENTIAL - STANDARD ACCESSIBLE/ LEVEL 2 EVCS 0 SPACERESIDENTIAL - VAN ACCESSIBLE/ LEVEL 2 EVCS 0 SPACE TOTAL RESIDENTIAL PARKING LEVEL 02 - PROVIDED 46 SPACES LEVEL 03RESIDENTIAL - TANDEM (COMPACT)/ EV READY 1 SPACERESIDENTIAL - TANDEM (STANDARD)/ EV READY 1 SPACERESIDENTIAL - COMPACT/ EV READY 12 SPACESRESIDENTIAL - STANDARD/ EV READY 27 SPACESRESIDENTIAL - COMPACT/ LEVEL 2 EV EVCS 4 SPACESRESIDENTIAL - STANDARD/ LEVEL 2 EV EVCS 0 SPACERESIDENTIAL - STANDARD ACCESSIBLE 0 SPACERESIDENTIAL - VAN ACCESSIBLE 0 SPACERESIDENTIAL - STANDARD ACCESSIBLE/ LEVEL 2 EVCS 1 SPACERESIDENTIAL - VAN ACCESSIBLE/ LEVEL 2 EVCS 1 SPACE TOTAL RESIDENTIAL PARKING LEVEL 03 - PROVIDED 47 SPACESTOTAL RETAIL/ VISITOR PARKING (LEVEL 01) - PROVIDED 21 SPACESTOTAL RESIDENTIAL PARKING (LEVELS 02 & 03) - PROVIDED 93 SPACES 3 3
390 of 786
EV READY EV READY
EV READY
COMPACT /
EV READY
COMPACT /
EV READY
COMPACT /
EV READY
COMPACT
COMPACT /
EV READY EV READY
COMPACT
EV READY EV READY EV READY EV READY EV READY EV READY
EV READY EV READY
DN
10%
DN 18%
NO
PARKING
STOP
EV READY
NO
PARKING
VAN
COMPACT /
EV READY EV READY
COMPACT /
EV READY EV READY
A
1 B C D E F G H K
245
2.22.5 C.1
2.7 3
B.3 B.5 J
1 A4.11
2 A3.15
1 A3.16
1 A3.15
2 A3.16
4.5 A.6 B.6 B.6 D.4 F.6 G.4 H.2 J.1
10'-11" 6'-1" 7'-6" 5'-6" 6'-1" 8'-11" 6'-0" 9'-0" 12'-6" 11'-4" 16'-2" 27'-6" 15'-4" 12'-2" 11'-10" 16'-8" 7'-3" 22'-3" 2'-11" 11'-1" 227'-0"
15'-11" 10'-7" 8'-1" 8'-2" 32'-0" 14'-9" 12'-3"
102'-11"
2 A4.11
2.4 ELEV 01
##
ELEV 02
##
UPDN
STAIR #02
##
STAIR #01
##
UPDN
RESIDENTIAL
PARKING
##
MOTORCYCLE
PARKING
R=33'
R=35'
R=33'
R=35'
R=33'
R=35'
EV READY
COMPACT /
EV READY
COMPACT /
EV READY
COMPACT /
EV READY
COMPACT / EV READY
COMPACT /
EV READY
COMPACT /
EV READY
COMPACT /
UP
10%
UP
18%
EV READY EV READY
EV READY
COMPACT
COMPACT
MOTORCYCLE
PARKING
SHAFT
##
EV READY
COMPACT /
EV READY EV READY EV READY
EV READY EV READY EV READY
7 TYP.
8 TYP.
23 TYP.
1 10
TYP.
11 TYP.
29 TYP.
30 TYP.
28 TYP.
23 TYP.
34 TYP.
35 TYP.
23 TYP.
5 5
31 TYP.
38 41
7 TYP.
1 7 1
TYP.
8 TYP.
10 TYP.
10 TYP.
8 TYP.
7 TYP.
1 42
8'-9" 8'-6" 8'-3" 8'-9" 8'-6" 8'-3" 8'-9" 8'-6" 8'-6" 8'-6" 8'-6" 8'-6" 8'-9" 8'-9" 8'-9" 8'-9" 8'-9" 9'-9" 9'-5" 10'-0"
18'-0"
8'-0" 8'-6" 8'-6" 8'-6" 8'-6"
8'-10" 9'-3" 8'-10" 9'-3" 5'-0" 9'-0" 8'-9" 8'-3" 8'-6" 8'-9" 8'-3" 8'-6" 8'-9" 8'-6" 8'-6" 18'-0" 18'-0" 24'-0" 18'-0" 12'-0" 5'-0" 8'-9" 8'-6" 8'-3" 8'-9" 8'-6" 17'-5" 17'-0"
8'-6" 8'-0" 8'-6"
8'-9" 8'-9"
18'-0" 18'-0"
24'-0"
8'-9" 9'-0"
24'-0"
24'-0"
27'-0"
22'-0"
24'-0"
+14'-0" A.F.F.
T.O. SLAB
32"
46 TYP.
48 TYP.
48 TYP.
12'-0"
12'-0"
28 TYP.
28 TYP.
R42'-0"
R18'-0"
R16'-8"
11'-0" 11'-0"
9'-0" 8'-6" 8'-6" 9'-0" 8'-6" 9'-0" 9'-6"
8'-3" 8'-9" 8'-6" 8'-3" 8'-9" 8'-6" 8'-3" 8'-9" 8'-6" 8'-6" R18'-0"
28'-0"
14'-0"
PROJECT NO:
DATE DESCRIPTION
Q:\2022 Jobs\225684 - Nazareth Vista Mixed-Use\01-Planning App\2026-MMDD 4th PLANNING SUBMITTAL\225684-A212.dwg - Mar 25, 2026, 3:32pm - evans The "user(s)" in possession of this documentation acknowledge(s) thatARC TEC's and ARC TEC consultants' drawings, specifications, reports, electronic data and other documentation are instruments of service. ARC TEC and ARC TEC consultants shall be deemed the author and owner of suchdocumentation. The "user(s)" in possession of this documentation shall not use or authorize any other person to use ARC TEC's or ARC TEC consultants' instruments of service. Reuse without ARC TEC's written authorization will be at the user(s) sole risk and without liability to ARC TEC and ARC TEC's consultants. The user(s) possessing this documentation shall indemnify and hold harmless ARC TEC and ARC TEC's consultants and agents and employees from and against all claims, damages losses and expenses, including but not limited to attorneys' fees, arising out of unauthorized reuse of ARC TEC o r ARC TEC' s c o n su lt a n t s i n s tr ume n t s o f s e r v i c e . Written dimensions on this drawing shall have precedence over any scaleddimension. DO NOT SCALE THIS DRAWING for accurate dimensions and notify ARC TEC of any discrepancies.
© Copyright ARC TEC, Inc. 2021
In Association with:
A R C T E C
ARCHITECTURAL TECHNOLOGIES
www.arctecinc.com
Arizona
2960 East Northern Avenue, Building C
Phoenix, AZ 85028 602.953.2355
California
1731 Technology Drive, Suite 750
San Jose, CA 95110 408.496.0676
225684.11
A Planning Applicationt For:
NAZARETH VISTA
606 - 616 SOUTH B STREET
SAN MATEO, CA 94401
03.26.2025 SB330 APPLICATION04.30.2025 1ST PLANNING SUBMITTAL08.11.2025 2ND PLANNING SUBMITTAL12.16.2025 3RD PLANNING SUBMITTAL03.26.2026 4TH PLANNING SUBMITTAL PA-2024-039
12 A2.12
FLOOR PLAN - LEVEL 02
1 EXISTING PROPERTY LINE
KEYNOTES - FLOOR PLAN . NOTE: NOT ALL KEYNOTES LISTED MAY APPLY TO THIS DRAWING. 23 PRIMARY RETAIL ENTRANCE
4 PRIMARY RESIDENTIAL ENTRANCE
56789
SERVICE DOOR
10 ACCESS RAMP TO PARKING STRUCTURE W/ TRANSITION SLOPE
TOP BOTTOM SIDEWALK
11 2-HR FIRE RATED WALLS AT TRASH CHUTTE
EXTERIOR WALLS - REFER TO EXTERIOR ELEVATIONS
CANOPY ABOVE (SHOWN DASHED)CANOPY BELOW
EXTERIOR ALUM./ GLASS STOREFRONT WINDOW SYSTEM
STRUCTURAL COLUMN
12 2HR. MECHANICAL SHAFT13 42" HIGH GUARDRAIL AT RESIDENTIAL COMMON AREA14 EGRESS DOOR15 RESIDENTIAL DWELLING UNIT (TYP.)16 RETAIL/ VISITOR PARKING17 42"H. AFF PARAPET WALL18 66"H. PRIVACY SCREEN19 PRIVATE BALCONY ABOVE (SHOWN DASHED)20 EXTERIOR SLIDING GLASS DOOR 21 1HR FIRE RATED DEMISING WALL AT DWELLING UNIT22 1HR FIRE RATED WALL AT HALLWAY23 2HR FIRE RATED WALL AT STAIRS, ELEVATORS AND TRASH CHUTE24 PRIVATE RESIDENTIAL BALCONY WITH 42" H. GUARDRAIL25 FITNESS CENTER ENTRANCE - FOR RESIDENT ONLY26 VISITOR/ RETAIL PARKING ENTRANCE27 TRASH ROOM28 6" CONCRETE CURB29 DIRECTIONAL MARKING30 PARKING STRIPPING31 5FT WIDE ACCESSIBLE AISLE32 BOLLARDS33 LONG-TERM BIKE LOCKER (RETAIL)34 ELECTRIC VEHICLE CHARGING STATION35 CONCRETE WHEEL STOP36 FITNESS CENTER - RESIDENT ONLY37 RESIDENTIAL LOBBY38 RESIDENTIAL ELEVATORS39 RESIDENTIAL COMMON AREA (OUTDOOR)40 42" H. PARAPET WALL AT RESIDENTIAL PRIVATE BALCONY41 RESIDENTIAL PARKING42 MOTORCYCLE PARKING43 RESIDENTIAL LONG-TERM BIKE STORAGE REFER TO SHEET A1.02 FOR ENLARGED PLAN AND MANUFACTURER SPECIFICATIONS. PROVIDE ELECTRICAL OUTLETS FOR E-BIKE CHARGERS 4445
CLEARANCE BAR ABOVE (SHOWN DASHED)
MOTORIZED SECURITY GRILLE
46 ACCESSIBLE PATH OF TRAVEL47 ELECTRICAL ROOM TO INCLUDE CITY RADIO COMMUNICATION EQUIPMENT AND ALL SUPPORTING EQUIPMENT.
48 4" WIDE PAINT CENTERLINE STRIPPING
EV PARKING ANALYSIS TABLE - PROVIDED
RETAIL/ VISITOR USE TOTAL NUMBER OF STALLS 21
TOTAL NUMBER OF LEVEL 2 EVCS STALLS 10% or 2
TOTAL NUMBER OF LEVEL 2 EV CAPABLE STALLS 10% or 2
RESIDENTIAL USE TOTAL NUMBER OF STALLS 93
TOTAL NUMBER OF LEVEL 2 EVCS STALLS (15%) 14
TOTAL NUMBER OF LEVEL 2 EV READY STALLS (85%) 79
93 2% OR 2
COMPLIANT MINIMUM REQUIRED TOTAL PARKING SPACES
REQUIRED NUMBER OF ACCESSIBLE PARKING STALLS
RESIDENTIAL (CBC 1109A.3)
EV NOTES:
1. EV AND EVSE PER SAN MATEO GREEN BUILDING
REACH CODES, ACTIVE JAN. 1, 2023.
2. PER CALGREEN 2022 TABLE 5.106.5.3.1
1-25 1
COMPLIANT MINIMUM REQUIRED TOTAL PARKING SPACES
REQUIRED NUMBER OF ACCESSIBLE PARKING STALLS
(CBC TABLE 11B-208.2)
YES
RETAIL
YES
Parking Provided
Use Short-Term Bike Long-Term Bike Bike Total Standard Compact Standard
(Tandem)/ Level
2 EV Ready
Compact
(Tandem)/ Level
2 EV Ready
Standard
Accessible
Standard
Accessible Level
2 EVCS
Van Accessible Van Accessible Level 2 EVCS Standard Level 2 EV Capable Standard Level 2 EVCS Standard Level 2 EV Ready Compact Level 2 EVCS Compact Level 2 EV Ready Parking Provided Level 1 - Retail/ Visitors 4 1 7 8 5 1 1 1 4 1 21Level 1 - Residential 6 6Level 2 - Residential 1 1 1 1 4 22 4 12 46Level 3 - Residential 97 97 1 1 1 1 27 4 12 47 Total Parking Provided 10 98 114
MINIMUM BICYCLE PARKING
STALLS REQUIRED
(PER CITY OF SAN MATEO MUNICIPAL CODE SECTION 27.64.262
REQUIRED SHORT-TERM - RESIDENTIAL
STUDIO AND ONE-BEDROOM UNIT @ 0.05 SPACES PER UNIT83 UNITS x 0.05 = 4.65 SPACES TWO-BEDROOM UNIT @ 0.1 SPACES PER UNIT
11 UNITS x 0.10 = 1.1 SPACE
TOTAL REQUIRED SHORT-TERM - RESIDENTIAL: 5.75 SPACES OR 6 SPACES
REQUIRED LONG-TERM - RESIDENTIAL
STUDIO AND ONE-BEDROOM UNIT @ 1.0 SPACE PER UNIT83 UNITS x 1.0 =83 SPACES TWO-BEDROOM UNIT @ 1.25 SPACES PER UNIT
11 UNITS x 1.25 = 13.75 SPACES
TOTAL REQUIRED LONG-TERM - RESIDENTIAL: 96.75 SPACES OR 97 SPACES
REQUIRED SHORT-TERM - RETAIL
1 SPACE PER 2,000 S.F. OF RETAIL AREA
7,286 S.F. / 2,000 S.F. = 3.64 SPACES OR 4 SPACES
REQUIRED LONG-TERM - RETAIL
1 SPACE PER 12,000 S.F. OF RETAIL AREA
7,286 S.F. / 12,000 S.F. = 0.60 SPACES OR 1 SPACE
PROVIDED SHORT-TERM SPACESRESIDENTIAL 6 SPACESRETAIL 4 SPACES TOTAL 10 SPACES
PROVIDED LONG-TERM SPACES
RESIDENTIAL 97 SPACES (PROVIDED @ LEVEL 03)RETAIL 1 SPACE (PROVIDED @ LEVEL 01) TOTAL 98 SPACES
1 1
SCALE:
FLOOR PLAN - LEVEL 02
3/32" = 1'-0"
0 5 10 20 30 50 70
1 PARKING ANALYSIS
CALIFORNIA ASSEMBLY BILL (AB) 2097 PROHIBITS PUBLIC AGENCIES FROM
IMPOSING MINIMUM PARKING REQUIREMENTS ON RESIDENTIAL/ COMMERCIAL PROJECT LOCATED WITHIN ONE-HALF MILE OF A MAJOR TRANSIT STOPPARKING - PROVIDEDLEVEL 01 RETAIL - COMPACT 5 SPACESRETAIL - STANDARD 8 SPACESRETAIL - STANDARD/ EV CAPABLE 4 SPACESRETAIL - VAN ACCESSIBLE 1 SPACERETAIL - VAN ACCESSIBLE/ LEVEL 2 EVCS 1 SPACERETAIL - STANDARD ACCESSIBLE/ LEVEL 2 EVCS 1 SPACERETAIL - STANDARD/ LEVEL 2 EVCS 1 SPACE TOTAL RETAIL PARKING LEVEL01 - PROVIDED 21 SPACES
LEVEL 02RESIDENTIAL - TANDEM (COMPACT)/ EV READY 1 SPACERESIDENTIAL - TANDEM (STANDARD)/ EV READY 1 SPACERESIDENTIAL - COMPACT/ EV READY 12 SPACESRESIDENTIAL - STANDARD/ EV READY 22 SPACESRESIDENTIAL - COMPACT/ LEVEL2 EVCS 4 SPACESRESIDENTIAL - STANDARD/ LEVEL2 EVCS 4 SPACESRESIDENTIAL - STANDARD ACCESSIBLE 1 SPACERESIDENTIAL - VAN ACCESSIBLE 1 SPACERESIDENTIAL - STANDARD ACCESSIBLE/ LEVEL 2 EVCS 0 SPACERESIDENTIAL - VAN ACCESSIBLE/ LEVEL 2 EVCS 0 SPACE TOTAL RESIDENTIAL PARKING LEVEL 02 - PROVIDED 46 SPACES LEVEL 03RESIDENTIAL - TANDEM (COMPACT)/ EV READY 1 SPACERESIDENTIAL - TANDEM (STANDARD)/ EV READY 1 SPACERESIDENTIAL - COMPACT/ EV READY 12 SPACESRESIDENTIAL - STANDARD/ EV READY 27 SPACESRESIDENTIAL - COMPACT/ LEVEL 2 EV EVCS 4 SPACESRESIDENTIAL - STANDARD/ LEVEL 2 EV EVCS 0 SPACERESIDENTIAL - STANDARD ACCESSIBLE 0 SPACERESIDENTIAL - VAN ACCESSIBLE 0 SPACERESIDENTIAL - STANDARD ACCESSIBLE/ LEVEL 2 EVCS 1 SPACERESIDENTIAL - VAN ACCESSIBLE/ LEVEL 2 EVCS 1 SPACE TOTAL RESIDENTIAL PARKING LEVEL 03 - PROVIDED 47 SPACESTOTAL RETAIL/ VISITOR PARKING (LEVEL 01) - PROVIDED 21 SPACESTOTAL RESIDENTIAL PARKING (LEVELS 02 & 03) - PROVIDED 93 SPACES 3 3
3 391 of 786
7 TYP.
23 TYP.
1 11
TYP.
29 TYP.
30 TYP.
28 TYP.
23 TYP.
34 TYP.
35 TYP.
23 TYP.
5 31
TYP.
38 41
7 TYP.
1 8 1
TYP.
8 TYP.
7 TYP.
1 42
43 8'-9" 8'-6" 8'-3" 8'-9" 8'-6" 8'-3" 8'-9" 8'-6" 8'-6" 8'-6" 8'-6" 8'-6" 8'-9" 8'-9" 8'-9" 8'-9" 8'-8" 9'-9" 9'-5" 10'-0"
18'-0" 24'-0" 18'-0" 18'-0" 12'-0" 5'-0" 9'-0" 8'-9" 8'-9" 8'-6" 8'-3" 8'-9" 8'-6" 8'-3" 8'-9" 8'-6" 8'-3" 8'-3" 8'-6" 8'-9" 8'-9" 8'-6" 8'-6" 9'-8" 9'-3" 9'-0" 8'-9" 9'-0" 8'-9" 9'-0" 8'-6" 8'-6" 9'-0" 9'-0" 9'-9"24'-0" 17'-4"
8'-0" 8'-6" 8'-6" 9'-0"
9'-3"
9'-0"
9'-9" 8'-9" 9'-3"
17'-0"
8'-6" 8'-0"
8'-9"
8'-6"
8'-9"
24'-0"
4'-8"
+24'-0" A.F.F.
T.O. SLAB
46 TYP.
32"
48 TYP.
30 TYP.
28 28
24'-0"
12'-0"
12'-0"
R42'-0"
R18'-0"
R16'-8"
R29'-0"
EV READY EV READY
EV READY
COMPACT /
EV READY
COMPACT /
EV READY
COMPACT /
EV READY
COMPACT /
EV READY
EV READY
COMPACT /
COMPACT /
EV READY
EV READY EV READY EV READY EV READY EV READY EV READY
EV READY EV READY EV READY
DN
10%
NO
PARKING
EV READY
COMPACT /
STOP
COMPACT /
EV READY EV READY
EV READY
EV READY
NO
PARKING
ELEV 01
##
ELEV 02
##
RESI.LONG-TERM
BIKE STORAGE
##
RESIDENTIAL
PARKING
##
UPDN
STAIR #02
##
STAIR #01
##
MOTORCYCLE
PARKING
R=33'
R=35'
R=33'
R=35'
EV READY
COMPACT
LEVEL 2 EVCS
STANDARD
ACCESSIBLE
LEVEL 2 EVCS
VAN
ACCESSIBLE
MOTORCYCLE
PARKING
EV READY
COMPACT
EV READY
EV READY
COMPACT
COMPACT
A
1 B C D E F G H K
245
2.22.5 C.1
2.7 3
B.3 B.5 J
1 A4.11
2 A3.15
1 A3.16
1 A3.15
2 A3.16
4.5 A.6 B.6 B.6 D.4 F.6 G.4 H.2 J.1
10'-11" 6'-1" 7'-6" 5'-6" 6'-1" 8'-11" 6'-0" 9'-0" 12'-6" 11'-4" 16'-2" 27'-6" 15'-4" 12'-2" 11'-10" 16'-8" 7'-3" 22'-3" 2'-11" 11'-1" 227'-0"
15'-11" 10'-7" 8'-1" 8'-2" 32'-0" 14'-9" 12'-3"
102'-11"
2 A4.11
2.4 UPDN
SHAFT
##
EV READY
COMPACT
EV READY
COMPACT
EV READY EV READY EV READY
EV READY EV READY EV READY
COMPACT
EV READY EV READY EV READY
EV READY EV READY
EV READY
COMPACT /
EV READY
COMPACT /
EV READY
COMPACT /
DN 18%
PROJECT NO:
DATE DESCRIPTION
Q:\2022 Jobs\225684 - Nazareth Vista Mixed-Use\01-Planning App\2026-MMDD 4th PLANNING SUBMITTAL\225684-A213.dwg - Mar 25, 2026, 3:33pm - evans The "user(s)" in possession of this documentation acknowledge(s) thatARC TEC's and ARC TEC consultants' drawings, specifications, reports, electronic data and other documentation are instruments of service. ARC TEC and ARC TEC consultants shall be deemed the author and owner of suchdocumentation. The "user(s)" in possession of this documentation shall not use or authorize any other person to use ARC TEC's or ARC TEC consultants' instruments of service. Reuse without ARC TEC's written authorization will be at the user(s) sole risk and without liability to ARC TEC and ARC TEC's consultants. The user(s) possessing this documentation shall indemnify and hold harmless ARC TEC and ARC TEC's consultants and agents and employees from and against all claims, damages losses and expenses, including but not limited to attorneys' fees, arising out of unauthorized reuse of ARC TEC o r ARC TEC' s c o n su lt a n t s i n s tr ume n t s o f s e r v i c e . Written dimensions on this drawing shall have precedence over any scaleddimension. DO NOT SCALE THIS DRAWING for accurate dimensions and notify ARC TEC of any discrepancies.
© Copyright ARC TEC, Inc. 2021
In Association with:
A R C T E C
ARCHITECTURAL TECHNOLOGIES
www.arctecinc.com
Arizona
2960 East Northern Avenue, Building C
Phoenix, AZ 85028 602.953.2355
California
1731 Technology Drive, Suite 750
San Jose, CA 95110 408.496.0676
225684.11
A Planning Applicationt For:
NAZARETH VISTA
606 - 616 SOUTH B STREET
SAN MATEO, CA 94401
03.26.2025 SB330 APPLICATION04.30.2025 1ST PLANNING SUBMITTAL08.11.2025 2ND PLANNING SUBMITTAL12.16.2025 3RD PLANNING SUBMITTAL03.26.2026 4TH PLANNING SUBMITTAL PA-2024-039
12 A2.13
FLOOR PLAN - LEVEL 03
1 EXISTING PROPERTY LINE
KEYNOTES - FLOOR PLAN . NOTE: NOT ALL KEYNOTES LISTED MAY APPLY TO THIS DRAWING. 23 PRIMARY RETAIL ENTRANCE
4 PRIMARY RESIDENTIAL ENTRANCE
56789
SERVICE DOOR
10 ACCESS RAMP TO PARKING STRUCTURE W/ TRANSITION SLOPE
TOP BOTTOM SIDEWALK
11 2-HR FIRE RATED WALLS AT TRASH CHUTTE
EXTERIOR WALLS - REFER TO EXTERIOR ELEVATIONS
CANOPY ABOVE (SHOWN DASHED)CANOPY BELOW
EXTERIOR ALUM./ GLASS STOREFRONT WINDOW SYSTEM
STRUCTURAL COLUMN
12 2HR. MECHANICAL SHAFT13 42" HIGH GUARDRAIL AT RESIDENTIAL COMMON AREA14 EGRESS DOOR15 RESIDENTIAL DWELLING UNIT (TYP.)16 RETAIL/ VISITOR PARKING17 42"H. AFF PARAPET WALL18 66"H. PRIVACY SCREEN19 PRIVATE BALCONY ABOVE (SHOWN DASHED)20 EXTERIOR SLIDING GLASS DOOR 21 1HR FIRE RATED DEMISING WALL AT DWELLING UNIT22 1HR FIRE RATED WALL AT HALLWAY23 2HR FIRE RATED WALL AT STAIRS, ELEVATORS AND TRASH CHUTE24 PRIVATE RESIDENTIAL BALCONY WITH 42" H. GUARDRAIL25 FITNESS CENTER ENTRANCE - FOR RESIDENT ONLY26 VISITOR/ RETAIL PARKING ENTRANCE27 TRASH ROOM28 6" CONCRETE CURB29 DIRECTIONAL MARKING30 PARKING STRIPPING31 5FT WIDE ACCESSIBLE AISLE32 BOLLARDS33 LONG-TERM BIKE LOCKER (RETAIL)34 ELECTRIC VEHICLE CHARGING STATION35 CONCRETE WHEEL STOP36 FITNESS CENTER - RESIDENT ONLY37 RESIDENTIAL LOBBY38 RESIDENTIAL ELEVATORS39 RESIDENTIAL COMMON AREA (OUTDOOR)40 42" H. PARAPET WALL AT RESIDENTIAL PRIVATE BALCONY41 RESIDENTIAL PARKING42 MOTORCYCLE PARKING43 RESIDENTIAL LONG-TERM BIKE STORAGE REFER TO SHEET A1.02 FOR ENLARGED PLAN AND MANUFACTURER SPECIFICATIONS. PROVIDE ELECTRICAL OUTLETS FOR E-BIKE CHARGERS 4445
CLEARANCE BAR ABOVE (SHOWN DASHED)
MOTORIZED SECURITY GRILLE
46 ACCESSIBLE PATH OF TRAVEL47 ELECTRICAL ROOM TO INCLUDE CITY RADIO COMMUNICATION EQUIPMENT AND ALL SUPPORTING EQUIPMENT.
48 4" WIDE PAINT CENTERLINE STRIPPING
EV PARKING ANALYSIS TABLE - PROVIDED
RETAIL/ VISITOR USE TOTAL NUMBER OF STALLS 21
TOTAL NUMBER OF LEVEL 2 EVCS STALLS 10% or 2
TOTAL NUMBER OF LEVEL 2 EV CAPABLE STALLS 10% or 2
RESIDENTIAL USE TOTAL NUMBER OF STALLS 93
TOTAL NUMBER OF LEVEL 2 EVCS STALLS (15%) 14
TOTAL NUMBER OF LEVEL 2 EV READY STALLS (85%) 79
93 2% OR 2
COMPLIANT MINIMUM REQUIRED TOTAL PARKING SPACES
REQUIRED NUMBER OF ACCESSIBLE PARKING STALLS
RESIDENTIAL (CBC 1109A.3)
EV NOTES:
1. EV AND EVSE PER SAN MATEO GREEN BUILDING
REACH CODES, ACTIVE JAN. 1, 2023.
2. PER CALGREEN 2022 TABLE 5.106.5.3.1
1-25 1
COMPLIANT MINIMUM REQUIRED TOTAL PARKING SPACES
REQUIRED NUMBER OF ACCESSIBLE PARKING STALLS
(CBC TABLE 11B-208.2)
YES
RETAIL
YES
Parking Provided
Use Short-Term Bike Long-Term Bike Bike Total Standard Compact Standard
(Tandem)/ Level
2 EV Ready
Compact
(Tandem)/ Level
2 EV Ready
Standard
Accessible
Standard
Accessible Level
2 EVCS
Van Accessible Van Accessible Level 2 EVCS Standard Level 2 EV Capable Standard Level 2 EVCS Standard Level 2 EV Ready Compact Level 2 EVCS Compact Level 2 EV Ready Parking Provided Level 1 - Retail/ Visitors 4 1 7 8 5 1 1 1 4 1 21Level 1 - Residential 6 6Level 2 - Residential 1 1 1 1 4 22 4 12 46Level 3 - Residential 97 97 1 1 1 1 27 4 12 47 Total Parking Provided 10 98 114
MINIMUM BICYCLE PARKING
STALLS REQUIRED
(PER CITY OF SAN MATEO MUNICIPAL CODE SECTION 27.64.262
REQUIRED SHORT-TERM - RESIDENTIAL
STUDIO AND ONE-BEDROOM UNIT @ 0.05 SPACES PER UNIT83 UNITS x 0.05 = 4.65 SPACES TWO-BEDROOM UNIT @ 0.1 SPACES PER UNIT
11 UNITS x 0.10 = 1.1 SPACE
TOTAL REQUIRED SHORT-TERM - RESIDENTIAL: 5.75 SPACES OR 6 SPACES
REQUIRED LONG-TERM - RESIDENTIAL
STUDIO AND ONE-BEDROOM UNIT @ 1.0 SPACE PER UNIT83 UNITS x 1.0 =83 SPACES TWO-BEDROOM UNIT @ 1.25 SPACES PER UNIT
11 UNITS x 1.25 = 13.75 SPACES
TOTAL REQUIRED LONG-TERM - RESIDENTIAL: 96.75 SPACES OR 97 SPACES
REQUIRED SHORT-TERM - RETAIL
1 SPACE PER 2,000 S.F. OF RETAIL AREA
7,286 S.F. / 2,000 S.F. = 3.64 SPACES OR 4 SPACES
REQUIRED LONG-TERM - RETAIL
1 SPACE PER 12,000 S.F. OF RETAIL AREA
7,286 S.F. / 12,000 S.F. = 0.60 SPACES OR 1 SPACE
PROVIDED SHORT-TERM SPACESRESIDENTIAL 6 SPACESRETAIL 4 SPACES TOTAL 10 SPACES
PROVIDED LONG-TERM SPACES
RESIDENTIAL 97 SPACES (PROVIDED @ LEVEL 03)RETAIL 1 SPACE (PROVIDED @ LEVEL 01) TOTAL 98 SPACES
SCALE:
FLOOR PLAN - LEVEL 03
3/32" = 1'-0"
0 5 10 20 30 50 70
1 PARKING ANALYSIS
CALIFORNIA ASSEMBLY BILL (AB) 2097 PROHIBITS PUBLIC AGENCIES FROM
IMPOSING MINIMUM PARKING REQUIREMENTS ON RESIDENTIAL/ COMMERCIAL PROJECT LOCATED WITHIN ONE-HALF MILE OF A MAJOR TRANSIT STOPPARKING - PROVIDEDLEVEL 01 RETAIL - COMPACT 5 SPACESRETAIL - STANDARD 8 SPACESRETAIL - STANDARD/ EV CAPABLE 4 SPACESRETAIL - VAN ACCESSIBLE 1 SPACERETAIL - VAN ACCESSIBLE/ LEVEL 2 EVCS 1 SPACERETAIL - STANDARD ACCESSIBLE/ LEVEL 2 EVCS 1 SPACERETAIL - STANDARD/ LEVEL 2 EVCS 1 SPACE TOTAL RETAIL PARKING LEVEL01 - PROVIDED 21 SPACES
LEVEL 02RESIDENTIAL - TANDEM (COMPACT)/ EV READY 1 SPACERESIDENTIAL - TANDEM (STANDARD)/ EV READY 1 SPACERESIDENTIAL - COMPACT/ EV READY 12 SPACESRESIDENTIAL - STANDARD/ EV READY 22 SPACESRESIDENTIAL - COMPACT/ LEVEL2 EVCS 4 SPACESRESIDENTIAL - STANDARD/ LEVEL2 EVCS 4 SPACESRESIDENTIAL - STANDARD ACCESSIBLE 1 SPACERESIDENTIAL - VAN ACCESSIBLE 1 SPACERESIDENTIAL - STANDARD ACCESSIBLE/ LEVEL 2 EVCS 0 SPACERESIDENTIAL - VAN ACCESSIBLE/ LEVEL 2 EVCS 0 SPACE TOTAL RESIDENTIAL PARKING LEVEL 02 - PROVIDED 46 SPACES LEVEL 03RESIDENTIAL - TANDEM (COMPACT)/ EV READY 1 SPACERESIDENTIAL - TANDEM (STANDARD)/ EV READY 1 SPACERESIDENTIAL - COMPACT/ EV READY 12 SPACESRESIDENTIAL - STANDARD/ EV READY 27 SPACESRESIDENTIAL - COMPACT/ LEVEL 2 EV EVCS 4 SPACESRESIDENTIAL - STANDARD/ LEVEL 2 EV EVCS 0 SPACERESIDENTIAL - STANDARD ACCESSIBLE 0 SPACERESIDENTIAL - VAN ACCESSIBLE 0 SPACERESIDENTIAL - STANDARD ACCESSIBLE/ LEVEL 2 EVCS 1 SPACERESIDENTIAL - VAN ACCESSIBLE/ LEVEL 2 EVCS 1 SPACE TOTAL RESIDENTIAL PARKING LEVEL 03 - PROVIDED 47 SPACESTOTAL RETAIL/ VISITOR PARKING (LEVEL 01) - PROVIDED 21 SPACESTOTAL RESIDENTIAL PARKING (LEVELS 02 & 03) - PROVIDED 93 SPACES 3 3
392 of 786
A 1 B C D E F G H K 2452.2 2.5 C.1 2.73 B.3 B.5 J 1 A4.11 2 A3.15 1 A3.16 1 A3.15 2 A3.16 4.5 A.6 B.6 B.6 D.4 F.6 G.4 H.2 J.1 10'-11" 6'-1" 7'-6" 5'-6" 6'-1" 8'-11" 6'-0" 9'-0" 12'-6" 11'-4" 16'-2" 27'-6" 15'-4" 12'-2" 11'-10" 16'-8" 7'-3" 22'-3" 2'-11" 11'-1" 227'-0" 15'-11" 10'-7" 8'-1" 8'-2" 32'-0" 14'-9" 12'-3"
102'-11" 2 A4.11 2.4 ELEC. RM ## LARGE TRASH ## ELEVATOR LOBBY ## STAIR #01 ## ELEV 01 ## ELEV 02 ## HALLWAY ## UPDN UPDN STAIR #02 ## CHUTE VESTIBULE ## 74 S.F. PRIVATE BALCONY ## 88 S.F. PRIVATE BALCONY ## PRIVATE BALCONY ## 58 S.F. 74 S.F. PRIVATE PATIO ## 74 S.F. PRIVATE BALCONY ## 74 S.F. PRIVATE BALCONY ## 74 S.F. PRIVATE BALCONY ## 74 S.F. PRIVATE BALCONY ## 74 S.F. PRIVATE PATIO ## SHARED RESIDENTIAL OPEN AREA ## UNIT B1.0 1BR/ 1BA 820 S.F. UNIT B1.1 1BR/ 1BA 800 S.F. UNIT B1.4 1BR/ 1BA 832 S.F. UNIT C1.1 2BR/ 2BA 1,400 S.F. UNIT C1.0 2BR/ 2BA 1,308 S.F. UNIT B1.2 1BR/ 1BA 894 S.F. UNIT A1.2 (BMR - VLI) STUDIO 653 S.F. UNIT B1.3 1BR/ 1BA 747 S.F. UNIT B1.3 1BR/ 1BA 747 S.F. UNIT B1.3 (BMR - VLI) 1BR/ 1BA 747 S.F. UNIT A1.4 STUDIO 517 S.F. UNIT A1.3 STUDIO 468 S.F. UNIT A1.3 STUDIO 468 S.F. UNIT A1.3 STUDIO 468 S.F. COMMUNITY CENTER ## UNIT C1.3 2BR/ 1BA 1,223 S.F. UNIT C1.4 (BMR - VLI) 2BR/ 2BA 1,240 S.F. 74 S.F. PRIVATE PATIO ## 92 S.F. PRIVATE BALCONY ## SHAFT ## 1 137 TYP. 8 TYP. 13 TYP. 8 1 TYP. 7 TYP. 13 TYP. 22 TYP. 21 TYP. 14 TYP. 14 TYP. 23 TYP. 15 39 23 TYP. 23 TYP. 7 TYP. 8 TYP. 13 TYP. 1 TYP. 13 TYP. 13 TYP. 1 TYP. +34'-0" A.F.F. T.O. SLAB PROJECT NO: DATE DESCRIPTION Q:\2022 Jobs\225684 - Nazareth Vista Mixed-Use\01-Planning App\2025-MMDD 3RD PLANNING SUBMITTAL\225684-A214.dwg - Dec 22, 2025, 1:03pm - josephinek The "user(s)" in possession of this documentation acknowledge(s) that ARC TEC's and ARC TEC consultants' drawings, specifications, reports, electronic data and other documentation are instruments of service. ARC TEC and ARC TEC consultants shall be deemed the author and owner of such documentation. The "user(s)" in possession of this documentation shall not use or authorize any other person to use ARC TEC's or ARC TEC consultants' instruments of service. Reuse without ARC TEC's written authorization will be at the user(s) sole risk and without liability to ARC TEC and ARC TEC's consultants. The user(s) possessing this documentation shall indemnify and hold harmless ARC TEC and ARC TEC's consultants and agents and employees from and against all claims, damages losses and expenses, including but not limited to attorneys' fees, arising out of unauthorized reuse of ARC TEC o r ARC TEC' s c o n s u l t a n t s i n s tr ume n t s o f s e r v i c e . Written dimensions on this drawing shall have precedence over any scaled dimension. DO NOT SCALE THIS DRAWING for accurate dimensions and notify ARC TEC of any discrepancies. © Copyright ARC TEC, Inc. 2021 In Association with: A R C T E C ARCHITECTURAL TECHNOLOGIES www.arctecinc.com Arizona 2960 East Northern Avenue, Building C Phoenix, AZ 85028 602.953.2355 California 1731 Technology Drive, Suite 750 San Jose, CA 95110 408.496.0676 225684.11 A Planning Applicationt For:
NAZARETH VISTA
606 - 616 SOUTH B STREET
SAN MATEO, CA 94401 03.26.2025 SB330 APPLICATION 04.30.2025 1ST PLANNING SUBMITTAL 08.11.2025 2ND PLANNING SUBMITTAL 12.16.2025 3RD PLANNING SUBMITTAL PA-2024-039 12 A2.14 FLOOR PLAN - LEVEL 04 1 EXISTING PROPERTY LINE KEYNOTES - FLOOR PLAN . NOTE: NOT ALL KEYNOTES LISTED MAY APPLY TO THIS DRAWING. 23 PRIMARY RETAIL ENTRANCE 4 PRIMARY RESIDENTIAL ENTRANCE 56789 SERVICE DOOR 10 ACCESS RAMP TO PARKING STRUCTURE W/ TRANSITION SLOPE TOP BOTTOM SIDEWALK 11 2-HR FIRE RATED WALLS AT TRASH CHUTTE EXTERIOR WALLS - REFER TO EXTERIOR ELEVATIONS CANOPY ABOVE (SHOWN DASHED) CANOPY BELOW EXTERIOR ALUM./ GLASS STOREFRONT WINDOW SYSTEM STRUCTURAL COLUMN 12 2HR. MECHANICAL SHAFT 13 42" HIGH GUARDRAIL AT RESIDENTIAL COMMON AREA 14 EGRESS DOOR 15 RESIDENTIAL DWELLING UNIT (TYP.) 16 RETAIL/ VISITOR PARKING 17 42"H. AFF PARAPET WALL 18 66"H. PRIVACY SCREEN 19 PRIVATE BALCONY ABOVE (SHOWN DASHED) 20 EXTERIOR SLIDING GLASS DOOR 21 1HR FIRE RATED DEMISING WALL AT DWELLING UNIT 22 1HR FIRE RATED WALL AT HALLWAY 23 2HR FIRE RATED WALL AT STAIRS, ELEVATORS AND TRASH CHUTE 24 PRIVATE RESIDENTIAL BALCONY WITH 42" H. GUARDRAIL 25 FITNESS CENTER ENTRANCE - FOR RESIDENT ONLY 26 VISITOR/ RETAIL PARKING ENTRANCE 27 TRASH ROOM 28 6" CONCRETE CURB 29 DIRECTIONAL MARKING 30 PARKING STRIPPING 31 5FT WIDE ACCESSIBLE AISLE 32 BOLLARDS 33 LONG-TERM BIKE LOCKER (RETAIL) 34 ELECTRIC VEHICLE CHARGING STATION 35 CONCRETE WHEEL STOP 36 FITNESS CENTER - RESIDENT ONLY 37 RESIDENTIAL LOBBY 38 RESIDENTIAL ELEVATORS 39 RESIDENTIAL COMMON AREA (OUTDOOR) 40 42" H. PARAPET WALL AT RESIDENTIAL PRIVATE BALCONY 41 RESIDENTIAL PARKING 42 MOTORCYCLE PARKING 43 RESIDENTIAL LONG-TERM BIKE STORAGE REFER TO SHEET A1.02 FOR ENLARGED PLAN AND MANUFACTURER SPECIFICATIONS. PROVIDE ELECTRICAL OUTLETS FOR E-BIKE CHARGERS 4445 CLEARANCE BAR ABOVE (SHOWN DASHED) MOTORIZED SECURITY GRILLE 46 ACCESSIBLE PATH OF TRAVEL 47 ELECTRICAL ROOM TO INCLUDE CITY RADIO COMMUNICATION EQUIPMENT AND ALL SUPPORTING EQUIPMENT. 48 4" WIDE PAINT CENTERLINE STRIPPING PROJECT DATA: Residential Units Unit Type Unit Area (S.F.) Balcony Area (S.F.) Unit Area w/Balcony (S.F.) # Unit Level 4 # Unit Level 5 # Unit Level 6 # Unit Level 7 # Unit Level 8 Total # Units Density Bonus Parking Req'd Short-Term Bike Pkg Req'd Long-Term Bike Pkg Req'd Total Unit Area Total Balcony Area Unit Mix A1.0 (Studio) 541 0 541 0 3 3 3 3 12 0.50 0.05 1.00 6,492 0 45% A1.1 (Studio) 660 0 660 0 1 1 1 0 3 0.50 0.05 1.00 1,980 0 A1.2 (Studio) 653 0 653 1 1 1 1 0 4 0.50 0.05 1.00 2,612 0 A1.2A (Studio) 553 92 645 0 1 1 1 0 3 0.50 0.05 1.00 1659 276 A1.3 (Studio) 468 0 468 3 3 3 3 0 12 0.50 0.05 1.00 5,616 0 A1.4 (Studio) 517 0 517 1 1 1 1 0 4 0.50 0.05 1.00 2,068 0 A1.5 (Studio) 507 152 659 0 0 0 0 1 1 0.50 0.05 1.00 507 152 A1.6 (Studio) 442 92 534 0 0 0 0 1 1 0.50 0.05 1.00 442 92 A1.6A (Studio) 481 96 577 0 0 0 0 1 1 0.50 0.05 1.00 481 96 A1.7 (Studio) 370 0 370 0 0 0 0 1 1 0.50 0.05 1.00 370 0 B1.0 (1BR/1BA Unit) 820 74 894 1 2 2 2 2 9 0.50 0.05 1.00 7,380 666 42% B1.1 (1BR/1BA Unit) 800 74 874 1 1 1 1 1 5 0.50 0.05 1.00 4,000 370 B1.2 (1BR/1BA Unit) 894 148 1,042 1 1 1 1 0 4 0.50 0.05 1.00 3,576 592 B1.3 (1BR/1BA Unit) 747 74 821 3 3 3 3 0 12 0.50 0.05 1.00 8964 888 B1.4 (1BR/1BA Unit) 832 88 920 1 1 1 1 0 4 0.50 0.05 1.00 3328 352 B1.5 (1BR/1BA Unit) 976 627 1603 0 0 0 0 1 1 0.50 0.05 1.00 976 627 B1.6 (1BR/1BA Unit) 622 195 817 0 0 0 0 3 3 0.50 0.05 1.00 1866 585 B1.7 (1BR/1BA Unit) 670 220 890 0 0 0 0 1 1 0.50 0.05 1.00 670 220 B1.8 (1BR/1BA Unit) 623 260 883 0 0 0 0 1 1 0.50 0.05 1.00 623 260 B1.9 (1BR/1BA Unit) 713 611 1324 0 0 0 0 1 1 0.50 0.05 1.00 713 611 C1.0 (2BR/2BA Unit) 1308 0 1,308 1 1 1 1 0 4 0.50 0.10 1.25 5,232 0 13% C1.1 (2BR/2BA Unit) 1,400 58 1,458 1 1 1 1 0 4 0.50 0.10 1.25 5,600 232 C1.2 (2BR/2BA Unit) 1,118 277 1,395 0 0 0 0 1 1 0.50 0.10 1.25 1,118 277 C1.3 (2BR/1BA Unit) 1,223 92 1,315 1 0 0 0 0 1 0.50 0.10 1.25 1223 92 C1.4 (2BR/2BA Unit) 1,240 74 1314 1 0 0 0 0 1 0.50 0.10 1.25 1240 74 Total # dwelling units 16 20 20 20 18 94 67,495 6,553 Parcel Coverage Location % Coverage Area (S.F.) Ground Level Open Parcel 27,921 Subtotal Open Parcel Required Open Space Private Residential Open Space (Level 4/ Level 5/ Level 6/ Level 7 & Level 8) (S.F.) - Provided 6,553 Common Residential Open Space at Level 4 (S.F.) - Provided 5,378 Total open space private + common (residential) - Provided 11,931 BMR UNIT BREAKDOWN # VLI (VERY LOW INCOME) UNITS UNIT TYPE STUDIO LOCATION LEVEL 04 1 # LI ( LOW INCOME) UNITS 0 # MOD ( MODERATE INCOME) UNITS 0 TAG A1.2 1BED/1BA B1.3 LEVEL 04 1 0 0 2BED/2BA C1.4 LEVEL 04 1 0 0 STUDIO A1.3 LEVEL 05 1 0 0 1BED/1BA B1.1 LEVEL 05 1 0 0 STUDIO A1.0 LEVEL 06 1 0 0 1BED/1BA B1.3 LEVEL 06 1 0 0 STUDIO A1.0 LEVEL 07 1 0 0 STUDIO A1.2 LEVEL 07 1 0 0 653 AREA (S.F.) 747 1,240 468 800 541 747 541 653 TOTAL BMR UNITS 10 0 0 TOTAL BMR UNITS 111111111 % BMR UNITS 10% 10% 10% 10% 10% 10% 10% 10% 10% 1BED/1BA B1.1 800 LEVEL 07 1 0 0 1 10% SCALE: FLOOR PLAN - LEVEL 04 3/32" = 1'-0" 0 5 10 20 30 50 70 393 of 786 A 1 B C D E F G H K 2452.2 2.5 C.1 2.73 B.3 B.5 J 1 A4.11 2 A3.15 1 A3.16 1 A3.15 2 A3.16 4.5 A.6 B.6 B.6 D.4 F.6 G.4 H.2 J.1 10'-11" 6'-1" 7'-6" 5'-6" 6'-1" 8'-11" 6'-0" 9'-0" 12'-6" 11'-4" 16'-2" 27'-6" 15'-4" 12'-2" 11'-10" 16'-8" 7'-3" 22'-3" 2'-11" 11'-1" 227'-0" 15'-11" 10'-7" 8'-1" 8'-2" 32'-0" 14'-9" 12'-3"
102'-11" 2 A4.11 2.4 UNIT B1.4 1BR/ 1BA 832 S.F. ELEC. RM ## LARGE TRASH ## ELEVATOR LOBBY ## STAIR #01 ## ELEV 01 ## ELEV 02 ## UNIT C1.1 2BR/ 2BA 1,400 S.F. HALLWAY ## UPDN UPDN STAIR #02 ## UNIT C1.0 2BR/ 2BA 1,308 S.F. UNIT B1.2 1BR/ 1BA 894 S.F. 74 S.F. PRIVATE BALCONY ## 88 S.F. PRIVATE BALCONY ## PRIVATE BALCONY ## 58 S.F. 74 S.F. PRIVATE BALCONY ## 74 S.F. PRIVATE BALCONY ## 74 S.F. PRIVATE BALCONY ## UNIT A1.1 STUDIO 660 S.F. 74 S.F. PRIVATE BALCONY ## 74 S.F. PRIVATE BALCONY ## 74 S.F. PRIVATE BALCONY ## 74 S.F. PRIVATE BALCONY ## UNIT B1.3 1BR/ 1BA 747 S.F. UNIT B1.3 1BR/ 1BA 747 S.F. UNIT B1.3 1BR/ 1BA 747 S.F. UNIT A1.4 STUDIO 517 S.F. UNIT A1.3 (BMR - VLI) STUDIO 468 S.F. UNIT A1.3 STUDIO 468 S.F. UNIT A1.3 STUDIO 468 S.F. UNIT B1.0 1BR/ 1BA 820 S.F. UNIT B1.1 (BMR - VLI) 1BR/ 1BA 800 S.F. UNIT B1.0 1BR/ 1BA 820 S.F. UNIT A1.0 STUDIO 541 S.F. UNIT A1.0 STUDIO 541 S.F. UNIT A1.0 STUDIO 541 S.F. 92 S.F. PRIVATE BALCONY ## UNIT A1.2 STUDIO 653 S.F. UNIT A1.2A STUDIO 563 S.F. CHUTE VESTIBULE ## SHAFT ## 1 7 TYP. 8 TYP. 13 TYP. 8 1 TYP. 7 TYP. 13 TYP. 22 TYP. 21 TYP. 23 TYP. 15 23 TYP. 23 TYP. 7 TYP. 8 TYP. 13 TYP. 1 TYP. 1 TYP. 13 TYP. +44'-2" A.F.F. T.O. SLAB PROJECT NO: DATE DESCRIPTION Q:\2022 Jobs\225684 - Nazareth Vista Mixed-Use\01-Planning App\2025-MMDD 3RD PLANNING SUBMITTAL\225684-A215.dwg - Dec 22, 2025, 1:03pm - josephinek The "user(s)" in possession of this documentation acknowledge(s) that ARC TEC's and ARC TEC consultants' drawings, specifications, reports, electronic data and other documentation are instruments of service. ARC TEC and ARC TEC consultants shall be deemed the author and owner of such documentation. The "user(s)" in possession of this documentation shall not use or authorize any other person to use ARC TEC's or ARC TEC consultants' instruments of service. Reuse without ARC TEC's written authorization will be at the user(s) sole risk and without liability to ARC TEC and ARC TEC's consultants. The user(s) possessing this documentation shall indemnify and hold harmless ARC TEC and ARC TEC's consultants and agents and employees from and against all claims, damages losses and expenses, including but not limited to attorneys' fees, arising out of unauthorized reuse of ARC TEC o r ARC TEC' s c o n s u l t a n t s i n s tr ume n t s o f s e r v i c e . Written dimensions on this drawing shall have precedence over any scaled dimension. DO NOT SCALE THIS DRAWING for accurate dimensions and notify ARC TEC of any discrepancies. © Copyright ARC TEC, Inc. 2021 In Association with: A R C T E C ARCHITECTURAL TECHNOLOGIES www.arctecinc.com Arizona 2960 East Northern Avenue, Building C Phoenix, AZ 85028 602.953.2355 California 1731 Technology Drive, Suite 750 San Jose, CA 95110 408.496.0676 225684.11 A Planning Applicationt For:
NAZARETH VISTA
606 - 616 SOUTH B STREET
SAN MATEO, CA 94401 03.26.2025 SB330 APPLICATION 04.30.2025 1ST PLANNING SUBMITTAL 08.11.2025 2ND PLANNING SUBMITTAL 12.16.2025 3RD PLANNING SUBMITTAL PA-2024-039 12 A2.15 FLOOR PLAN - LEVEL 05 PROJECT DATA: Residential Units Unit Type Unit Area (S.F.) Balcony Area (S.F.) Unit Area w/Balcony (S.F.) # Unit Level 4 # Unit Level 5 # Unit Level 6 # Unit Level 7 # Unit Level 8 Total # Units Density Bonus Parking Req'd Short-Term Bike Pkg Req'd Long-Term Bike Pkg Req'd Total Unit Area Total Balcony Area Unit Mix A1.0 (Studio) 541 0 541 0 3 3 3 3 12 0.50 0.05 1.00 6,492 0 45% A1.1 (Studio) 660 0 660 0 1 1 1 0 3 0.50 0.05 1.00 1,980 0 A1.2 (Studio) 653 0 653 1 1 1 1 0 4 0.50 0.05 1.00 2,612 0 A1.2A (Studio) 553 92 645 0 1 1 1 0 3 0.50 0.05 1.00 1659 276 A1.3 (Studio) 468 0 468 3 3 3 3 0 12 0.50 0.05 1.00 5,616 0 A1.4 (Studio) 517 0 517 1 1 1 1 0 4 0.50 0.05 1.00 2,068 0 A1.5 (Studio) 507 152 659 0 0 0 0 1 1 0.50 0.05 1.00 507 152 A1.6 (Studio) 442 92 534 0 0 0 0 1 1 0.50 0.05 1.00 442 92 A1.6A (Studio) 481 96 577 0 0 0 0 1 1 0.50 0.05 1.00 481 96 A1.7 (Studio) 370 0 370 0 0 0 0 1 1 0.50 0.05 1.00 370 0 B1.0 (1BR/1BA Unit) 820 74 894 1 2 2 2 2 9 0.50 0.05 1.00 7,380 666 42% B1.1 (1BR/1BA Unit) 800 74 874 1 1 1 1 1 5 0.50 0.05 1.00 4,000 370 B1.2 (1BR/1BA Unit) 894 148 1,042 1 1 1 1 0 4 0.50 0.05 1.00 3,576 592 B1.3 (1BR/1BA Unit) 747 74 821 3 3 3 3 0 12 0.50 0.05 1.00 8964 888 B1.4 (1BR/1BA Unit) 832 88 920 1 1 1 1 0 4 0.50 0.05 1.00 3328 352 B1.5 (1BR/1BA Unit) 976 627 1603 0 0 0 0 1 1 0.50 0.05 1.00 976 627 B1.6 (1BR/1BA Unit) 622 195 817 0 0 0 0 3 3 0.50 0.05 1.00 1866 585 B1.7 (1BR/1BA Unit) 670 220 890 0 0 0 0 1 1 0.50 0.05 1.00 670 220 B1.8 (1BR/1BA Unit) 623 260 883 0 0 0 0 1 1 0.50 0.05 1.00 623 260 B1.9 (1BR/1BA Unit) 713 611 1324 0 0 0 0 1 1 0.50 0.05 1.00 713 611 C1.0 (2BR/2BA Unit) 1308 0 1,308 1 1 1 1 0 4 0.50 0.10 1.25 5,232 0 13% C1.1 (2BR/2BA Unit) 1,400 58 1,458 1 1 1 1 0 4 0.50 0.10 1.25 5,600 232 C1.2 (2BR/2BA Unit) 1,118 277 1,395 0 0 0 0 1 1 0.50 0.10 1.25 1,118 277 C1.3 (2BR/1BA Unit) 1,223 92 1,315 1 0 0 0 0 1 0.50 0.10 1.25 1223 92 C1.4 (2BR/2BA Unit) 1,240 74 1314 1 0 0 0 0 1 0.50 0.10 1.25 1240 74 Total # dwelling units 16 20 20 20 18 94 67,495 6,553 Parcel Coverage Location % Coverage Area (S.F.) Ground Level Open Parcel 27,921 Subtotal Open Parcel Required 1 EXISTING PROPERTY LINE KEYNOTES - FLOOR PLAN . NOTE: NOT ALL KEYNOTES LISTED MAY APPLY TO THIS DRAWING. 23 PRIMARY RETAIL ENTRANCE 4 PRIMARY RESIDENTIAL ENTRANCE 56789 SERVICE DOOR 10 ACCESS RAMP TO PARKING STRUCTURE W/ TRANSITION SLOPE TOP BOTTOM SIDEWALK 11 2-HR FIRE RATED WALLS AT TRASH CHUTTE EXTERIOR WALLS - REFER TO EXTERIOR ELEVATIONS CANOPY ABOVE (SHOWN DASHED) CANOPY BELOW EXTERIOR ALUM./ GLASS STOREFRONT WINDOW SYSTEM STRUCTURAL COLUMN 12 2HR. MECHANICAL SHAFT 13 42" HIGH GUARDRAIL AT RESIDENTIAL COMMON AREA 14 EGRESS DOOR 15 RESIDENTIAL DWELLING UNIT (TYP.) 16 RETAIL/ VISITOR PARKING 17 42"H. AFF PARAPET WALL 18 66"H. PRIVACY SCREEN 19 PRIVATE BALCONY ABOVE (SHOWN DASHED) 20 EXTERIOR SLIDING GLASS DOOR 21 1HR FIRE RATED DEMISING WALL AT DWELLING UNIT 22 1HR FIRE RATED WALL AT HALLWAY 23 2HR FIRE RATED WALL AT STAIRS, ELEVATORS AND TRASH CHUTE 24 PRIVATE RESIDENTIAL BALCONY WITH 42" H. GUARDRAIL 25 FITNESS CENTER ENTRANCE - FOR RESIDENT ONLY 26 VISITOR/ RETAIL PARKING ENTRANCE 27 TRASH ROOM 28 6" CONCRETE CURB 29 DIRECTIONAL MARKING 30 PARKING STRIPPING 31 5FT WIDE ACCESSIBLE AISLE 32 BOLLARDS 33 LONG-TERM BIKE LOCKER (RETAIL) 34 ELECTRIC VEHICLE CHARGING STATION 35 CONCRETE WHEEL STOP 36 FITNESS CENTER - RESIDENT ONLY 37 RESIDENTIAL LOBBY 38 RESIDENTIAL ELEVATORS 39 RESIDENTIAL COMMON AREA (OUTDOOR) 40 42" H. PARAPET WALL AT RESIDENTIAL PRIVATE BALCONY 41 RESIDENTIAL PARKING 42 MOTORCYCLE PARKING 43 RESIDENTIAL LONG-TERM BIKE STORAGE REFER TO SHEET A1.02 FOR ENLARGED PLAN AND MANUFACTURER SPECIFICATIONS. PROVIDE ELECTRICAL OUTLETS FOR E-BIKE CHARGERS 4445 CLEARANCE BAR ABOVE (SHOWN DASHED) MOTORIZED SECURITY GRILLE 46 ACCESSIBLE PATH OF TRAVEL 47 ELECTRICAL ROOM TO INCLUDE CITY RADIO COMMUNICATION EQUIPMENT AND ALL SUPPORTING EQUIPMENT. 48 4" WIDE PAINT CENTERLINE STRIPPING BMR UNIT BREAKDOWN # VLI (VERY LOW INCOME) UNITS UNIT TYPE STUDIO LOCATION LEVEL 04 1 # LI ( LOW INCOME) UNITS 0 # MOD ( MODERATE INCOME) UNITS 0 TAG A1.2 1BED/1BA B1.3 LEVEL 04 1 0 0 2BED/2BA C1.4 LEVEL 04 1 0 0 STUDIO A1.3 LEVEL 05 1 0 0 1BED/1BA B1.1 LEVEL 05 1 0 0 STUDIO A1.0 LEVEL 06 1 0 0 1BED/1BA B1.3 LEVEL 06 1 0 0 STUDIO A1.0 LEVEL 07 1 0 0 STUDIO A1.2 LEVEL 07 1 0 0 653 AREA (S.F.) 747 1,240 468 800 541 747 541 653 TOTAL BMR UNITS 10 0 0 TOTAL BMR UNITS 111111111 % BMR UNITS 10% 10% 10% 10% 10% 10% 10% 10% 10% 1BED/1BA B1.1 800 LEVEL 07 1 0 0 1 10% Open Space Private Residential Open Space (Level 4/ Level 5/ Level 6/ Level 7 & Level 8) (S.F.) - Provided 6,553 Common Residential Open Space at Level 4 (S.F.) - Provided 5,378 Total open space private + common (residential) - Provided 11,931 SCALE: FLOOR PLAN - LEVEL 05 3/32" = 1'-0" 0 5 10 20 30 50 70 394 of 786 A 1 B C D E F G H K 2452.2 2.5 C.1 2.73 B.3 B.5 J 1 A4.11 2 A3.15 1 A3.16 1 A3.15 2 A3.16 4.5 A.6 B.6 B.6 D.4 F.6 G.4 H.2 J.1 10'-11" 6'-1" 7'-6" 5'-6" 6'-1" 8'-11" 6'-0" 9'-0" 12'-6" 11'-4" 16'-2" 27'-6" 15'-4" 12'-2" 11'-10" 16'-8" 7'-3" 22'-3" 2'-11" 11'-1" 227'-0" 15'-11" 10'-7" 8'-1" 8'-2" 32'-0" 14'-9" 12'-3"
102'-11" 2 A4.11 2.4 UNIT B1.4 1BR/ 1BA 832 S.F. ELEC. RM ## LARGE TRASH ## ELEVATOR LOBBY ## STAIR #01 ## ELEV 01 ## ELEV 02 ## UNIT C1.1 2BR/ 2BA 1,400 S.F. HALLWAY ## UPDN UPDN STAIR #02 ## UNIT C1.0 2BR/ 2BA 1,308 S.F. UNIT B1.2 1BR/ 1BA 894 S.F. 74 S.F. PRIVATE BALCONY ## 88 S.F. PRIVATE BALCONY ## PRIVATE BALCONY ## 58 S.F. 74 S.F. PRIVATE BALCONY ## 74 S.F. PRIVATE BALCONY ## 74 S.F. PRIVATE BALCONY ## UNIT A1.1 STUDIO 660 S.F. 74 S.F. PRIVATE BALCONY ## 74 S.F. PRIVATE BALCONY ## 74 S.F. PRIVATE BALCONY ## 74 S.F. PRIVATE BALCONY ## UNIT B1.3 1BR/ 1BA 747 S.F. UNIT B1.3 1BR/ 1BA 747 S.F. UNIT B1.3 (BMR - VLI) 1BR/ 1BA 747 S.F. UNIT A1.4 STUDIO 517 S.F. UNIT A1.3 STUDIO 468 S.F. UNIT A1.3 STUDIO 468 S.F. UNIT A1.3 STUDIO 468 S.F. UNIT B1.0 1BR/ 1BA 820 S.F. UNIT B1.1 1BR/ 1BA 800 S.F. UNIT B1.0 1BR/ 1BA 820 S.F. UNIT A1.0 STUDIO 541 S.F. UNIT A1.0 (BMR - VLI) STUDIO 541 S.F. UNIT A1.0 STUDIO 541 S.F. 92 S.F. PRIVATE BALCONY ## UNIT A1.2 STUDIO 653 S.F. UNIT A1.2A STUDIO 563 S.F. CHUTE VESTIBULE ## SHAFT ## 1 7 TYP. 8 TYP. 13 TYP. 8 1 TYP. 7 TYP. 13 TYP. 22 TYP. 21 TYP. 23 TYP. 15 23 TYP. 23 TYP. 7 TYP. 8 TYP. 13 TYP. 1 TYP. 1 TYP. 13 TYP. +54'-4" A.F.F. T.O. SLAB PROJECT NO: DATE DESCRIPTION Q:\2022 Jobs\225684 - Nazareth Vista Mixed-Use\01-Planning App\2025-MMDD 3RD PLANNING SUBMITTAL\225684-A216.dwg - Dec 22, 2025, 1:03pm - josephinek The "user(s)" in possession of this documentation acknowledge(s) that ARC TEC's and ARC TEC consultants' drawings, specifications, reports, electronic data and other documentation are instruments of service. ARC TEC and ARC TEC consultants shall be deemed the author and owner of such documentation. The "user(s)" in possession of this documentation shall not use or authorize any other person to use ARC TEC's or ARC TEC consultants' instruments of service. Reuse without ARC TEC's written authorization will be at the user(s) sole risk and without liability to ARC TEC and ARC TEC's consultants. The user(s) possessing this documentation shall indemnify and hold harmless ARC TEC and ARC TEC's consultants and agents and employees from and against all claims, damages losses and expenses, including but not limited to attorneys' fees, arising out of unauthorized reuse of ARC TEC o r ARC TEC' s c o n s u l t a n t s i n s tr ume n t s o f s e r v i c e . Written dimensions on this drawing shall have precedence over any scaled dimension. DO NOT SCALE THIS DRAWING for accurate dimensions and notify ARC TEC of any discrepancies. © Copyright ARC TEC, Inc. 2021 In Association with: A R C T E C ARCHITECTURAL TECHNOLOGIES www.arctecinc.com Arizona 2960 East Northern Avenue, Building C Phoenix, AZ 85028 602.953.2355 California 1731 Technology Drive, Suite 750 San Jose, CA 95110 408.496.0676 225684.11 A Planning Applicationt For:
NAZARETH VISTA
606 - 616 SOUTH B STREET
SAN MATEO, CA 94401 03.26.2025 SB330 APPLICATION 04.30.2025 1ST PLANNING SUBMITTAL 08.11.2025 2ND PLANNING SUBMITTAL 12.16.2025 3RD PLANNING SUBMITTAL PA-2024-039 12 A2.16 FLOOR PLAN - LEVEL 06 PROJECT DATA: Residential Units Unit Type Unit Area (S.F.) Balcony Area (S.F.) Unit Area w/Balcony (S.F.) # Unit Level 4 # Unit Level 5 # Unit Level 6 # Unit Level 7 # Unit Level 8 Total # Units Density Bonus Parking Req'd Short-Term Bike Pkg Req'd Long-Term Bike Pkg Req'd Total Unit Area Total Balcony Area Unit Mix A1.0 (Studio) 541 0 541 0 3 3 3 3 12 0.50 0.05 1.00 6,492 0 45% A1.1 (Studio) 660 0 660 0 1 1 1 0 3 0.50 0.05 1.00 1,980 0 A1.2 (Studio) 653 0 653 1 1 1 1 0 4 0.50 0.05 1.00 2,612 0 A1.2A (Studio) 553 92 645 0 1 1 1 0 3 0.50 0.05 1.00 1659 276 A1.3 (Studio) 468 0 468 3 3 3 3 0 12 0.50 0.05 1.00 5,616 0 A1.4 (Studio) 517 0 517 1 1 1 1 0 4 0.50 0.05 1.00 2,068 0 A1.5 (Studio) 507 152 659 0 0 0 0 1 1 0.50 0.05 1.00 507 152 A1.6 (Studio) 442 92 534 0 0 0 0 1 1 0.50 0.05 1.00 442 92 A1.6A (Studio) 481 96 577 0 0 0 0 1 1 0.50 0.05 1.00 481 96 A1.7 (Studio) 370 0 370 0 0 0 0 1 1 0.50 0.05 1.00 370 0 B1.0 (1BR/1BA Unit) 820 74 894 1 2 2 2 2 9 0.50 0.05 1.00 7,380 666 42% B1.1 (1BR/1BA Unit) 800 74 874 1 1 1 1 1 5 0.50 0.05 1.00 4,000 370 B1.2 (1BR/1BA Unit) 894 148 1,042 1 1 1 1 0 4 0.50 0.05 1.00 3,576 592 B1.3 (1BR/1BA Unit) 747 74 821 3 3 3 3 0 12 0.50 0.05 1.00 8964 888 B1.4 (1BR/1BA Unit) 832 88 920 1 1 1 1 0 4 0.50 0.05 1.00 3328 352 B1.5 (1BR/1BA Unit) 976 627 1603 0 0 0 0 1 1 0.50 0.05 1.00 976 627 B1.6 (1BR/1BA Unit) 622 195 817 0 0 0 0 3 3 0.50 0.05 1.00 1866 585 B1.7 (1BR/1BA Unit) 670 220 890 0 0 0 0 1 1 0.50 0.05 1.00 670 220 B1.8 (1BR/1BA Unit) 623 260 883 0 0 0 0 1 1 0.50 0.05 1.00 623 260 B1.9 (1BR/1BA Unit) 713 611 1324 0 0 0 0 1 1 0.50 0.05 1.00 713 611 C1.0 (2BR/2BA Unit) 1308 0 1,308 1 1 1 1 0 4 0.50 0.10 1.25 5,232 0 13% C1.1 (2BR/2BA Unit) 1,400 58 1,458 1 1 1 1 0 4 0.50 0.10 1.25 5,600 232 C1.2 (2BR/2BA Unit) 1,118 277 1,395 0 0 0 0 1 1 0.50 0.10 1.25 1,118 277 C1.3 (2BR/1BA Unit) 1,223 92 1,315 1 0 0 0 0 1 0.50 0.10 1.25 1223 92 C1.4 (2BR/2BA Unit) 1,240 74 1314 1 0 0 0 0 1 0.50 0.10 1.25 1240 74 Total # dwelling units 16 20 20 20 18 94 67,495 6,553 Parcel Coverage Location % Coverage Area (S.F.) Ground Level Open Parcel 27,921 Subtotal Open Parcel Required 1 EXISTING PROPERTY LINE KEYNOTES - FLOOR PLAN . NOTE: NOT ALL KEYNOTES LISTED MAY APPLY TO THIS DRAWING. 23 PRIMARY RETAIL ENTRANCE 4 PRIMARY RESIDENTIAL ENTRANCE 56789 SERVICE DOOR 10 ACCESS RAMP TO PARKING STRUCTURE W/ TRANSITION SLOPE TOP BOTTOM SIDEWALK 11 2-HR FIRE RATED WALLS AT TRASH CHUTTE EXTERIOR WALLS - REFER TO EXTERIOR ELEVATIONS CANOPY ABOVE (SHOWN DASHED) CANOPY BELOW EXTERIOR ALUM./ GLASS STOREFRONT WINDOW SYSTEM STRUCTURAL COLUMN 12 2HR. MECHANICAL SHAFT 13 42" HIGH GUARDRAIL AT RESIDENTIAL COMMON AREA 14 EGRESS DOOR 15 RESIDENTIAL DWELLING UNIT (TYP.) 16 RETAIL/ VISITOR PARKING 17 42"H. AFF PARAPET WALL 18 66"H. PRIVACY SCREEN 19 PRIVATE BALCONY ABOVE (SHOWN DASHED) 20 EXTERIOR SLIDING GLASS DOOR 21 1HR FIRE RATED DEMISING WALL AT DWELLING UNIT 22 1HR FIRE RATED WALL AT HALLWAY 23 2HR FIRE RATED WALL AT STAIRS, ELEVATORS AND TRASH CHUTE 24 PRIVATE RESIDENTIAL BALCONY WITH 42" H. GUARDRAIL 25 FITNESS CENTER ENTRANCE - FOR RESIDENT ONLY 26 VISITOR/ RETAIL PARKING ENTRANCE 27 TRASH ROOM 28 6" CONCRETE CURB 29 DIRECTIONAL MARKING 30 PARKING STRIPPING 31 5FT WIDE ACCESSIBLE AISLE 32 BOLLARDS 33 LONG-TERM BIKE LOCKER (RETAIL) 34 ELECTRIC VEHICLE CHARGING STATION 35 CONCRETE WHEEL STOP 36 FITNESS CENTER - RESIDENT ONLY 37 RESIDENTIAL LOBBY 38 RESIDENTIAL ELEVATORS 39 RESIDENTIAL COMMON AREA (OUTDOOR) 40 42" H. PARAPET WALL AT RESIDENTIAL PRIVATE BALCONY 41 RESIDENTIAL PARKING 42 MOTORCYCLE PARKING 43 RESIDENTIAL LONG-TERM BIKE STORAGE REFER TO SHEET A1.02 FOR ENLARGED PLAN AND MANUFACTURER SPECIFICATIONS. PROVIDE ELECTRICAL OUTLETS FOR E-BIKE CHARGERS 4445 CLEARANCE BAR ABOVE (SHOWN DASHED) MOTORIZED SECURITY GRILLE 46 ACCESSIBLE PATH OF TRAVEL 47 ELECTRICAL ROOM TO INCLUDE CITY RADIO COMMUNICATION EQUIPMENT AND ALL SUPPORTING EQUIPMENT. 48 4" WIDE PAINT CENTERLINE STRIPPING BMR UNIT BREAKDOWN # VLI (VERY LOW INCOME) UNITS UNIT TYPE STUDIO LOCATION LEVEL 04 1 # LI ( LOW INCOME) UNITS 0 # MOD ( MODERATE INCOME) UNITS 0 TAG A1.2 1BED/1BA B1.3 LEVEL 04 1 0 0 2BED/2BA C1.4 LEVEL 04 1 0 0 STUDIO A1.3 LEVEL 05 1 0 0 1BED/1BA B1.1 LEVEL 05 1 0 0 STUDIO A1.0 LEVEL 06 1 0 0 1BED/1BA B1.3 LEVEL 06 1 0 0 STUDIO A1.0 LEVEL 07 1 0 0 STUDIO A1.2 LEVEL 07 1 0 0 653 AREA (S.F.) 747 1,240 468 800 541 747 541 653 TOTAL BMR UNITS 10 0 0 TOTAL BMR UNITS 111111111 % BMR UNITS 10% 10% 10% 10% 10% 10% 10% 10% 10% 1BED/1BA B1.1 800 LEVEL 07 1 0 0 1 10% Open Space Private Residential Open Space (Level 4/ Level 5/ Level 6/ Level 7 & Level 8) (S.F.) - Provided 6,553 Common Residential Open Space at Level 4 (S.F.) - Provided 5,378 Total open space private + common (residential) - Provided 11,931 SCALE: FLOOR PLAN - LEVEL 06 3/32" = 1'-0" 0 5 10 20 30 50 70 395 of 786 A 1 B C D E F G H K 2452.2 2.5 C.1 2.73 B.3 B.5 J 1 A4.11 2 A3.15 1 A3.16 1 A3.15 2 A3.16 4.5 A.6 B.6 B.6 D.4 F.6 G.4 H.2 J.1 10'-11" 6'-1" 7'-6" 5'-6" 6'-1" 8'-11" 6'-0" 9'-0" 12'-6" 11'-4" 16'-2" 27'-6" 15'-4" 12'-2" 11'-10" 16'-8" 7'-3" 22'-3" 2'-11" 11'-1" 227'-0" 15'-11" 10'-7" 8'-1" 8'-2" 32'-0" 14'-9" 12'-3"
102'-11" 2 A4.11 2.4 UNIT B1.4 1BR/ 1BA 832 S.F. ELEC. RM ## LARGE TRASH ## ELEVATOR LOBBY ## STAIR #01 ## ELEV 01 ## ELEV 02 ## UNIT C1.1 2BR/ 2BA 1,400 S.F. HALLWAY ## UPDN UPDN STAIR #02 ## UNIT C1.0 2BR/ 2BA 1,308 S.F. UNIT B1.2 1BR/ 1BA 894 S.F. 74 S.F. PRIVATE BALCONY ## 88 S.F. PRIVATE BALCONY ## PRIVATE BALCONY ## 58 S.F. 74 S.F. PRIVATE BALCONY ## 74 S.F. PRIVATE BALCONY ## 74 S.F. PRIVATE BALCONY ## UNIT A1.1 STUDIO 660 S.F. 74 S.F. PRIVATE BALCONY ## 74 S.F. PRIVATE BALCONY ## 74 S.F. PRIVATE BALCONY ## 74 S.F. PRIVATE BALCONY ## UNIT B1.3 1BR/ 1BA 747 S.F. UNIT B1.3 1BR/ 1BA 747 S.F. UNIT B1.3 (BMR - VLI) 1BR/ 1BA 747 S.F. UNIT A1.4 STUDIO 517 S.F. UNIT A1.3 STUDIO 468 S.F. UNIT A1.3 STUDIO 468 S.F. UNIT A1.3 STUDIO 468 S.F. UNIT B1.0 1BR/ 1BA 820 S.F. UNIT B1.1 1BR/ 1BA (BMR - VLI) 800 S.F. UNIT B1.0 1BR/ 1BA 820 S.F. UNIT A1.0 STUDIO 541 S.F. UNIT A1.0 (BMR - VLI) STUDIO 541 S.F. UNIT A1.0 STUDIO 541 S.F. 92 S.F. PRIVATE BALCONY ## UNIT A1.2 (BMR - VLI) STUDIO 653 S.F. UNIT A1.2A STUDIO 563 S.F. CHUTE VESTIBULE ## SHAFT ## 1 7 TYP. 8 TYP. 13 TYP. 8 1 TYP. 7 TYP. 13 TYP. 22 TYP. 21 TYP. 23 TYP. 15 23 TYP. 23 TYP. 7 TYP. 8 TYP. 13 TYP. 1 TYP. 1 TYP. 13 TYP. +64'-6" A.F.F. T.O. SLAB PROJECT NO: DATE DESCRIPTION Q:\2022 Jobs\225684 - Nazareth Vista Mixed-Use\01-Planning App\2025-MMDD 3RD PLANNING SUBMITTAL\225684-A217.dwg - Dec 22, 2025, 1:03pm - josephinek The "user(s)" in possession of this documentation acknowledge(s) that ARC TEC's and ARC TEC consultants' drawings, specifications, reports, electronic data and other documentation are instruments of service. ARC TEC and ARC TEC consultants shall be deemed the author and owner of such documentation. The "user(s)" in possession of this documentation shall not use or authorize any other person to use ARC TEC's or ARC TEC consultants' instruments of service. Reuse without ARC TEC's written authorization will be at the user(s) sole risk and without liability to ARC TEC and ARC TEC's consultants. The user(s) possessing this documentation shall indemnify and hold harmless ARC TEC and ARC TEC's consultants and agents and employees from and against all claims, damages losses and expenses, including but not limited to attorneys' fees, arising out of unauthorized reuse of ARC TEC o r ARC TEC' s c o n s u l t a n t s i n s tr ume n t s o f s e r v i c e . Written dimensions on this drawing shall have precedence over any scaled dimension. DO NOT SCALE THIS DRAWING for accurate dimensions and notify ARC TEC of any discrepancies. © Copyright ARC TEC, Inc. 2021 In Association with: A R C T E C ARCHITECTURAL TECHNOLOGIES www.arctecinc.com Arizona 2960 East Northern Avenue, Building C Phoenix, AZ 85028 602.953.2355 California 1731 Technology Drive, Suite 750 San Jose, CA 95110 408.496.0676 225684.11 A Planning Applicationt For:
NAZARETH VISTA
606 - 616 SOUTH B STREET
SAN MATEO, CA 94401 03.26.2025 SB330 APPLICATION 04.30.2025 1ST PLANNING SUBMITTAL 08.11.2025 2ND PLANNING SUBMITTAL 12.16.2025 3RD PLANNING SUBMITTAL PA-2024-039 12 A2.17 FLOOR PLAN - LEVEL 07 PROJECT DATA: Residential Units Unit Type Unit Area (S.F.) Balcony Area (S.F.) Unit Area w/Balcony (S.F.) # Unit Level 4 # Unit Level 5 # Unit Level 6 # Unit Level 7 # Unit Level 8 Total # Units Density Bonus Parking Req'd Short-Term Bike Pkg Req'd Long-Term Bike Pkg Req'd Total Unit Area Total Balcony Area Unit Mix A1.0 (Studio) 541 0 541 0 3 3 3 3 12 0.50 0.05 1.00 6,492 0 45% A1.1 (Studio) 660 0 660 0 1 1 1 0 3 0.50 0.05 1.00 1,980 0 A1.2 (Studio) 653 0 653 1 1 1 1 0 4 0.50 0.05 1.00 2,612 0 A1.2A (Studio) 553 92 645 0 1 1 1 0 3 0.50 0.05 1.00 1659 276 A1.3 (Studio) 468 0 468 3 3 3 3 0 12 0.50 0.05 1.00 5,616 0 A1.4 (Studio) 517 0 517 1 1 1 1 0 4 0.50 0.05 1.00 2,068 0 A1.5 (Studio) 507 152 659 0 0 0 0 1 1 0.50 0.05 1.00 507 152 A1.6 (Studio) 442 92 534 0 0 0 0 1 1 0.50 0.05 1.00 442 92 A1.6A (Studio) 481 96 577 0 0 0 0 1 1 0.50 0.05 1.00 481 96 A1.7 (Studio) 370 0 370 0 0 0 0 1 1 0.50 0.05 1.00 370 0 B1.0 (1BR/1BA Unit) 820 74 894 1 2 2 2 2 9 0.50 0.05 1.00 7,380 666 42% B1.1 (1BR/1BA Unit) 800 74 874 1 1 1 1 1 5 0.50 0.05 1.00 4,000 370 B1.2 (1BR/1BA Unit) 894 148 1,042 1 1 1 1 0 4 0.50 0.05 1.00 3,576 592 B1.3 (1BR/1BA Unit) 747 74 821 3 3 3 3 0 12 0.50 0.05 1.00 8964 888 B1.4 (1BR/1BA Unit) 832 88 920 1 1 1 1 0 4 0.50 0.05 1.00 3328 352 B1.5 (1BR/1BA Unit) 976 627 1603 0 0 0 0 1 1 0.50 0.05 1.00 976 627 B1.6 (1BR/1BA Unit) 622 195 817 0 0 0 0 3 3 0.50 0.05 1.00 1866 585 B1.7 (1BR/1BA Unit) 670 220 890 0 0 0 0 1 1 0.50 0.05 1.00 670 220 B1.8 (1BR/1BA Unit) 623 260 883 0 0 0 0 1 1 0.50 0.05 1.00 623 260 B1.9 (1BR/1BA Unit) 713 611 1324 0 0 0 0 1 1 0.50 0.05 1.00 713 611 C1.0 (2BR/2BA Unit) 1308 0 1,308 1 1 1 1 0 4 0.50 0.10 1.25 5,232 0 13% C1.1 (2BR/2BA Unit) 1,400 58 1,458 1 1 1 1 0 4 0.50 0.10 1.25 5,600 232 C1.2 (2BR/2BA Unit) 1,118 277 1,395 0 0 0 0 1 1 0.50 0.10 1.25 1,118 277 C1.3 (2BR/1BA Unit) 1,223 92 1,315 1 0 0 0 0 1 0.50 0.10 1.25 1223 92 C1.4 (2BR/2BA Unit) 1,240 74 1314 1 0 0 0 0 1 0.50 0.10 1.25 1240 74 Total # dwelling units 16 20 20 20 18 94 67,495 6,553 Parcel Coverage Location % Coverage Area (S.F.) Ground Level Open Parcel 27,921 Subtotal Open Parcel Required 1 EXISTING PROPERTY LINE KEYNOTES - FLOOR PLAN . NOTE: NOT ALL KEYNOTES LISTED MAY APPLY TO THIS DRAWING. 23 PRIMARY RETAIL ENTRANCE 4 PRIMARY RESIDENTIAL ENTRANCE 56789 SERVICE DOOR 10 ACCESS RAMP TO PARKING STRUCTURE W/ TRANSITION SLOPE TOP BOTTOM SIDEWALK 11 2-HR FIRE RATED WALLS AT TRASH CHUTTE EXTERIOR WALLS - REFER TO EXTERIOR ELEVATIONS CANOPY ABOVE (SHOWN DASHED) CANOPY BELOW EXTERIOR ALUM./ GLASS STOREFRONT WINDOW SYSTEM STRUCTURAL COLUMN 12 2HR. MECHANICAL SHAFT 13 42" HIGH GUARDRAIL AT RESIDENTIAL COMMON AREA 14 EGRESS DOOR 15 RESIDENTIAL DWELLING UNIT (TYP.) 16 RETAIL/ VISITOR PARKING 17 42"H. AFF PARAPET WALL 18 66"H. PRIVACY SCREEN 19 PRIVATE BALCONY ABOVE (SHOWN DASHED) 20 EXTERIOR SLIDING GLASS DOOR 21 1HR FIRE RATED DEMISING WALL AT DWELLING UNIT 22 1HR FIRE RATED WALL AT HALLWAY 23 2HR FIRE RATED WALL AT STAIRS, ELEVATORS AND TRASH CHUTE 24 PRIVATE RESIDENTIAL BALCONY WITH 42" H. GUARDRAIL 25 FITNESS CENTER ENTRANCE - FOR RESIDENT ONLY 26 VISITOR/ RETAIL PARKING ENTRANCE 27 TRASH ROOM 28 6" CONCRETE CURB 29 DIRECTIONAL MARKING 30 PARKING STRIPPING 31 5FT WIDE ACCESSIBLE AISLE 32 BOLLARDS 33 LONG-TERM BIKE LOCKER (RETAIL) 34 ELECTRIC VEHICLE CHARGING STATION 35 CONCRETE WHEEL STOP 36 FITNESS CENTER - RESIDENT ONLY 37 RESIDENTIAL LOBBY 38 RESIDENTIAL ELEVATORS 39 RESIDENTIAL COMMON AREA (OUTDOOR) 40 42" H. PARAPET WALL AT RESIDENTIAL PRIVATE BALCONY 41 RESIDENTIAL PARKING 42 MOTORCYCLE PARKING 43 RESIDENTIAL LONG-TERM BIKE STORAGE REFER TO SHEET A1.02 FOR ENLARGED PLAN AND MANUFACTURER SPECIFICATIONS. PROVIDE ELECTRICAL OUTLETS FOR E-BIKE CHARGERS 4445 CLEARANCE BAR ABOVE (SHOWN DASHED) MOTORIZED SECURITY GRILLE 46 ACCESSIBLE PATH OF TRAVEL 47 ELECTRICAL ROOM TO INCLUDE CITY RADIO COMMUNICATION EQUIPMENT AND ALL SUPPORTING EQUIPMENT. 48 4" WIDE PAINT CENTERLINE STRIPPING BMR UNIT BREAKDOWN # VLI (VERY LOW INCOME) UNITS UNIT TYPE STUDIO LOCATION LEVEL 04 1 # LI ( LOW INCOME) UNITS 0 # MOD ( MODERATE INCOME) UNITS 0 TAG A1.2 1BED/1BA B1.3 LEVEL 04 1 0 0 2BED/2BA C1.4 LEVEL 04 1 0 0 STUDIO A1.3 LEVEL 05 1 0 0 1BED/1BA B1.1 LEVEL 05 1 0 0 STUDIO A1.0 LEVEL 06 1 0 0 1BED/1BA B1.3 LEVEL 06 1 0 0 STUDIO A1.0 LEVEL 07 1 0 0 STUDIO A1.2 LEVEL 07 1 0 0 653 AREA (S.F.) 747 1,240 468 800 541 747 541 653 TOTAL BMR UNITS 10 0 0 TOTAL BMR UNITS 111111111 % BMR UNITS 10% 10% 10% 10% 10% 10% 10% 10% 10% 1BED/1BA B1.1 800 LEVEL 07 1 0 0 1 10% Open Space Private Residential Open Space (Level 4/ Level 5/ Level 6/ Level 7 & Level 8) (S.F.) - Provided 6,553 Common Residential Open Space at Level 4 (S.F.) - Provided 5,378 Total open space private + common (residential) - Provided 11,931 SCALE: FLOOR PLAN - LEVEL 07 3/32" = 1'-0" 0 5 10 20 30 50 70 396 of 786 A 1 B C D E F G H K 2452.2 2.5 C.1 2.73 B.3 B.5 J 1 A4.11 2 A3.15 1 A3.16 1 A3.15 2 A3.16 4.5 A.6 B.6 B.6 D.4 F.6 G.4 H.2 J.1 10'-11" 6'-1" 7'-6" 5'-6" 6'-1" 8'-11" 6'-0" 9'-0" 12'-6" 11'-4" 16'-2" 27'-6" 15'-4" 12'-2" 11'-10" 16'-8" 7'-3" 22'-3" 2'-11" 11'-1" 227'-0" 15'-11" 10'-7" 8'-1" 8'-2" 32'-0" 14'-9" 12'-3"
102'-11" 2 A4.11 2.4 ELEC. RM ## ELEVATOR LOBBY ## STAIR #01 ## ELEV 01 ## ELEV 02 ## UPDN UPDN STAIR #02 ## PRIVATE BALCONY ## PRIVATE BALCONY ## PRIVATE BALCONY ## PRIVATE BALCONY ## PRIVATE BALCONY ## PRIVATE BALCONY ## PRIVATE BALCONY ## PRIVATE BALCONY ## PRIVATE BALCONY ## PRIVATE BALCONY ## 277 S.F. PRIVATE BALCONY ## PRIVATE BALCONY ## 611 S.F. 260 S.F. 220 S.F. 195 S.F. 91 S.F. 195 S.F. 195 S.F. 627 S.F. 92 S.F. 96 S.F. UNIT A1.5 152 S.F. STUDIO 507 S.F. UNIT A1.6A STUDIO 481 S.F. UNIT A1.6 STUDIO 442 S.F. UNIT B1.6 1BR/ 1BA 622 S.F. UNIT B1.5 1BR/ 1BA 976 S.F. UNIT B1.6 1BR/ 1BA 622 S.F. UNIT B1.6 1BR/ 1BA 622 S.F. UNIT B1.7 1BR/ 1BA 670 S.F. UNIT A1.7 STUDIO 370 S.F. UNIT B1.8 1BR/ 1BA 623 S.F. UNIT B1.9 1BR/ 1BA 713 S.F. UNIT C1.2 2BR/ 2BA 1,118 S.F. 74 S.F. PRIVATE BALCONY ## 74 S.F. PRIVATE BALCONY ## 74 S.F. PRIVATE BALCONY ## UNIT B1.0 1BR/ 1BA 820 S.F. UNIT B1.1 1BR/ 1BA 800 S.F. UNIT B1.0 1BR/ 1BA 820 S.F. UNIT A1.0 STUDIO 541 S.F. UNIT A1.0 STUDIO 541 S.F. UNIT A1.0 STUDIO 541 S.F. HALLWAY ## CHUTE VESTIBULE ## SHAFT ## 1 7 TYP. 40 TYP. 40 1 TYP. 7 TYP. 22 TYP. 21 TYP. 23 TYP. 15 23 TYP. 23 TYP. 8 TYP. 7 TYP. 40 TYP. 1 TYP. 1 TYP. 13 TYP. 7 TYP. 8 TYP. 9 TYP. 9 TYP. 8 TYP. 18 TYP. 8 TYP. 18 TYP. 9 TYP. +74'-8" A.F.F. T.O. SLAB PROJECT NO: DATE DESCRIPTION Q:\2022 Jobs\225684 - Nazareth Vista Mixed-Use\01-Planning App\2025-MMDD 3RD PLANNING SUBMITTAL\225684-A218.dwg - Dec 22, 2025, 1:03pm - josephinek The "user(s)" in possession of this documentation acknowledge(s) that ARC TEC's and ARC TEC consultants' drawings, specifications, reports, electronic data and other documentation are instruments of service. ARC TEC and ARC TEC consultants shall be deemed the author and owner of such documentation. The "user(s)" in possession of this documentation shall not use or authorize any other person to use ARC TEC's or ARC TEC consultants' instruments of service. Reuse without ARC TEC's written authorization will be at the user(s) sole risk and without liability to ARC TEC and ARC TEC's consultants. The user(s) possessing this documentation shall indemnify and hold harmless ARC TEC and ARC TEC's consultants and agents and employees from and against all claims, damages losses and expenses, including but not limited to attorneys' fees, arising out of unauthorized reuse of ARC TEC o r ARC TEC' s c o n s u l t a n t s i n s tr ume n t s o f s e r v i c e . Written dimensions on this drawing shall have precedence over any scaled dimension. DO NOT SCALE THIS DRAWING for accurate dimensions and notify ARC TEC of any discrepancies. © Copyright ARC TEC, Inc. 2021 In Association with: A R C T E C ARCHITECTURAL TECHNOLOGIES www.arctecinc.com Arizona 2960 East Northern Avenue, Building C Phoenix, AZ 85028 602.953.2355 California 1731 Technology Drive, Suite 750 San Jose, CA 95110 408.496.0676 225684.11 A Planning Applicationt For:
NAZARETH VISTA
606 - 616 SOUTH B STREET
SAN MATEO, CA 94401 03.26.2025 SB330 APPLICATION 04.30.2025 1ST PLANNING SUBMITTAL 08.11.2025 2ND PLANNING SUBMITTAL 12.16.2025 3RD PLANNING SUBMITTAL PA-2024-039 12 A2.18 FLOOR PLAN - LEVEL 08 PROJECT DATA: Residential Units Unit Type Unit Area (S.F.) Balcony Area (S.F.) Unit Area w/Balcony (S.F.) # Unit Level 4 # Unit Level 5 # Unit Level 6 # Unit Level 7 # Unit Level 8 Total # Units Density Bonus Parking Req'd Short-Term Bike Pkg Req'd Long-Term Bike Pkg Req'd Total Unit Area Total Balcony Area Unit Mix A1.0 (Studio) 541 0 541 0 3 3 3 3 12 0.50 0.05 1.00 6,492 0 45% A1.1 (Studio) 660 0 660 0 1 1 1 0 3 0.50 0.05 1.00 1,980 0 A1.2 (Studio) 653 0 653 1 1 1 1 0 4 0.50 0.05 1.00 2,612 0 A1.2A (Studio) 553 92 645 0 1 1 1 0 3 0.50 0.05 1.00 1659 276 A1.3 (Studio) 468 0 468 3 3 3 3 0 12 0.50 0.05 1.00 5,616 0 A1.4 (Studio) 517 0 517 1 1 1 1 0 4 0.50 0.05 1.00 2,068 0 A1.5 (Studio) 507 152 659 0 0 0 0 1 1 0.50 0.05 1.00 507 152 A1.6 (Studio) 442 92 534 0 0 0 0 1 1 0.50 0.05 1.00 442 92 A1.6A (Studio) 481 96 577 0 0 0 0 1 1 0.50 0.05 1.00 481 96 A1.7 (Studio) 370 0 370 0 0 0 0 1 1 0.50 0.05 1.00 370 0 B1.0 (1BR/1BA Unit) 820 74 894 1 2 2 2 2 9 0.50 0.05 1.00 7,380 666 42% B1.1 (1BR/1BA Unit) 800 74 874 1 1 1 1 1 5 0.50 0.05 1.00 4,000 370 B1.2 (1BR/1BA Unit) 894 148 1,042 1 1 1 1 0 4 0.50 0.05 1.00 3,576 592 B1.3 (1BR/1BA Unit) 747 74 821 3 3 3 3 0 12 0.50 0.05 1.00 8964 888 B1.4 (1BR/1BA Unit) 832 88 920 1 1 1 1 0 4 0.50 0.05 1.00 3328 352 B1.5 (1BR/1BA Unit) 976 627 1603 0 0 0 0 1 1 0.50 0.05 1.00 976 627 B1.6 (1BR/1BA Unit) 622 195 817 0 0 0 0 3 3 0.50 0.05 1.00 1866 585 B1.7 (1BR/1BA Unit) 670 220 890 0 0 0 0 1 1 0.50 0.05 1.00 670 220 B1.8 (1BR/1BA Unit) 623 260 883 0 0 0 0 1 1 0.50 0.05 1.00 623 260 B1.9 (1BR/1BA Unit) 713 611 1324 0 0 0 0 1 1 0.50 0.05 1.00 713 611 C1.0 (2BR/2BA Unit) 1308 0 1,308 1 1 1 1 0 4 0.50 0.10 1.25 5,232 0 13% C1.1 (2BR/2BA Unit) 1,400 58 1,458 1 1 1 1 0 4 0.50 0.10 1.25 5,600 232 C1.2 (2BR/2BA Unit) 1,118 277 1,395 0 0 0 0 1 1 0.50 0.10 1.25 1,118 277 C1.3 (2BR/1BA Unit) 1,223 92 1,315 1 0 0 0 0 1 0.50 0.10 1.25 1223 92 C1.4 (2BR/2BA Unit) 1,240 74 1314 1 0 0 0 0 1 0.50 0.10 1.25 1240 74 Total # dwelling units 16 20 20 20 18 94 67,495 6,553 Parcel Coverage Location % Coverage Area (S.F.) Ground Level Open Parcel 27,921 Subtotal Open Parcel Required 1 EXISTING PROPERTY LINE KEYNOTES - FLOOR PLAN . NOTE: NOT ALL KEYNOTES LISTED MAY APPLY TO THIS DRAWING. 23 PRIMARY RETAIL ENTRANCE 4 PRIMARY RESIDENTIAL ENTRANCE 56789 SERVICE DOOR 10 ACCESS RAMP TO PARKING STRUCTURE W/ TRANSITION SLOPE TOP BOTTOM SIDEWALK 11 2-HR FIRE RATED WALLS AT TRASH CHUTTE EXTERIOR WALLS - REFER TO EXTERIOR ELEVATIONS CANOPY ABOVE (SHOWN DASHED) CANOPY BELOW EXTERIOR ALUM./ GLASS STOREFRONT WINDOW SYSTEM STRUCTURAL COLUMN 12 2HR. MECHANICAL SHAFT 13 42" HIGH GUARDRAIL AT RESIDENTIAL COMMON AREA 14 EGRESS DOOR 15 RESIDENTIAL DWELLING UNIT (TYP.) 16 RETAIL/ VISITOR PARKING 17 42"H. AFF PARAPET WALL 18 66"H. PRIVACY SCREEN 19 PRIVATE BALCONY ABOVE (SHOWN DASHED) 20 EXTERIOR SLIDING GLASS DOOR 21 1HR FIRE RATED DEMISING WALL AT DWELLING UNIT 22 1HR FIRE RATED WALL AT HALLWAY 23 2HR FIRE RATED WALL AT STAIRS, ELEVATORS AND TRASH CHUTE 24 PRIVATE RESIDENTIAL BALCONY WITH 42" H. GUARDRAIL 25 FITNESS CENTER ENTRANCE - FOR RESIDENT ONLY 26 VISITOR/ RETAIL PARKING ENTRANCE 27 TRASH ROOM 28 6" CONCRETE CURB 29 DIRECTIONAL MARKING 30 PARKING STRIPPING 31 5FT WIDE ACCESSIBLE AISLE 32 BOLLARDS 33 LONG-TERM BIKE LOCKER (RETAIL) 34 ELECTRIC VEHICLE CHARGING STATION 35 CONCRETE WHEEL STOP 36 FITNESS CENTER - RESIDENT ONLY 37 RESIDENTIAL LOBBY 38 RESIDENTIAL ELEVATORS 39 RESIDENTIAL COMMON AREA (OUTDOOR) 40 42" H. PARAPET WALL AT RESIDENTIAL PRIVATE BALCONY 41 RESIDENTIAL PARKING 42 MOTORCYCLE PARKING 43 RESIDENTIAL LONG-TERM BIKE STORAGE REFER TO SHEET A1.02 FOR ENLARGED PLAN AND MANUFACTURER SPECIFICATIONS. PROVIDE ELECTRICAL OUTLETS FOR E-BIKE CHARGERS 4445 CLEARANCE BAR ABOVE (SHOWN DASHED) MOTORIZED SECURITY GRILLE 46 ACCESSIBLE PATH OF TRAVEL 47 ELECTRICAL ROOM TO INCLUDE CITY RADIO COMMUNICATION EQUIPMENT AND ALL SUPPORTING EQUIPMENT. 48 4" WIDE PAINT CENTERLINE STRIPPING BMR UNIT BREAKDOWN # VLI (VERY LOW INCOME) UNITS UNIT TYPE STUDIO LOCATION LEVEL 04 1 # LI ( LOW INCOME) UNITS 0 # MOD ( MODERATE INCOME) UNITS 0 TAG A1.2 1BED/1BA B1.3 LEVEL 04 1 0 0 2BED/2BA C1.4 LEVEL 04 1 0 0 STUDIO A1.3 LEVEL 05 1 0 0 1BED/1BA B1.1 LEVEL 05 1 0 0 STUDIO A1.0 LEVEL 06 1 0 0 1BED/1BA B1.3 LEVEL 06 1 0 0 STUDIO A1.0 LEVEL 07 1 0 0 STUDIO A1.2 LEVEL 07 1 0 0 653 AREA (S.F.) 747 1,240 468 800 541 747 541 653 TOTAL BMR UNITS 10 0 0 TOTAL BMR UNITS 111111111 % BMR UNITS 10% 10% 10% 10% 10% 10% 10% 10% 10% 1BED/1BA B1.1 800 LEVEL 07 1 0 0 1 10% Open Space Private Residential Open Space (Level 4/ Level 5/ Level 6/ Level 7 & Level 8) (S.F.) - Provided 6,553 Common Residential Open Space at Level 4 (S.F.) - Provided 5,378 Total open space private + common (residential) - Provided 11,931 SCALE: FLOOR PLAN - LEVEL 08 3/32" = 1'-0" 0 5 10 20 30 50 70 397 of 786 A 1 B C D E F G H K 2452.2 2.5 C.1 2.73 B.3 B.5 J 1 A4.11 2 A3.15 1 A3.16 1 A3.15 2 A3.16 4.5 A.6 B.6 B.6 D.4 F.6 G.4 H.2 J.1 10'-11" 6'-1" 7'-6" 5'-6" 6'-1" 8'-11" 6'-0" 9'-0" 12'-6" 11'-4" 16'-2" 27'-6" 15'-4" 12'-2" 11'-10" 16'-8" 7'-3" 22'-3" 2'-11" 11'-1" 227'-0" 15'-11" 10'-7" 8'-1" 8'-2" 32'-0" 14'-9" 12'-3"
102'-11" 2 A4.11 2.4 UPDN SHAFT ## 2 10 35111 1 1 32 2 3 4 7 5'-0" 5'-0"
5'-0" 5'-0"
5'-0" 5'-0"
5'-0" 5'-0"
2'-0"
2'-0"
2'-0"
2'-0"
5'-0" 5'-0"
5'-0" 2% 2% 2% 2% 2% 2% 2% 2%
2%
2% 2% 2%
2%
2%
2% 2% 9 TYP. PROJECT NO: DATE DESCRIPTION
Q:\2022 Jobs\225684 - Nazareth Vista Mixed-Use\01-Planning App\2025-MMDD 3RD PLANNING SUBMITTAL\225684-A231.dwg - Dec 22, 2025, 1:03pm - josephinek The "user(s)" in possession of this documentation acknowledge(s) that ARC TEC's and ARC TEC consultants' drawings, specifications, reports, electronic data and other documentation are instruments of service. ARC TEC and ARC TEC consultants shall be deemed the author and owner of such documentation. The "user(s)" in possession of this documentation shall not use or authorize any other person to use ARC TEC's or ARC TEC consultants' instruments of service. Reuse without ARC TEC's written authorization will be at the user(s) sole risk and without liability to ARC TEC and ARC TEC's consultants. The user(s) possessing this documentation shall indemnify and hold harmless ARC TEC and ARC TEC's consultants and agents and employees from and against all claims, damages losses and expenses, including but not limited to attorneys' fees, arising out of unauthorized reuse of ARC TEC o r ARC TEC' s c o n s u l t a n t s i n s tr ume n t s o f s e r v i c e . Written dimensions on this drawing shall have precedence over any scaled dimension. DO NOT SCALE THIS DRAWING for accurate dimensions and notify ARC TEC of any discrepancies. © Copyright ARC TEC, Inc. 2021 In Association with: A R C T E C ARCHITECTURAL TECHNOLOGIES www.arctecinc.com Arizona 2960 East Northern Avenue, Building C Phoenix, AZ 85028 602.953.2355 California 1731 Technology Drive, Suite 750 San Jose, CA 95110 408.496.0676 225684.11 A Planning Applicationt For:
NAZARETH VISTA
606 - 616 SOUTH B STREET
SAN MATEO, CA 94401 03.26.2025 SB330 APPLICATION 04.30.2025 1ST PLANNING SUBMITTAL 08.11.2025 2ND PLANNING SUBMITTAL 12.16.2025 3RD PLANNING SUBMITTAL PA-2024-039 12 A2.31 ROOF PLAN 1 KEYNOTES . NOTE: NOT ALL KEYNOTES LISTED MAY APPLY TO THIS DRAWING. RIDGE 2 CANOPY BELOW 3 PARAPET WALL 4 PRIMARY AND SECONDARY ROOF DRAIN 5 MECHANICAL EQUIPMENT SCREEN 6 LINE OF BALCONY AT FLOOR LEVEL 2 7 SINGLE-PLY ROOFING MEMBRANE OF TAPERED INSULATION RESIDENTIAL ROOF TOP MECHANICAL UNITS; FINAL SIZE AND LOCATION TO BE DETERMINED 8 NOT USED 910 ELEVATOR OVERRUN ROOF PLAN GENERAL NOTES 1. ROOFING TO A MINIMUM AGED SOLAR REFLECTANCE OF 0.70 AND A MINIMUM THERMAL EMITTANCE OF 0.85 OR2. A MINIMUM SOLAR REFLECTANCE INDEX (SRI) OF 85 PER SMMC 23.24.030 A 3 KW PHOTOVOLTAIC SYSTEM REQUIRED FOR NON-RESIDENTIAL WITH LESS THAN 10,000 SQUARE FEET A 3 KW PHOTOVOLTAIC SYSTEM REQUIRED FOR MUTLI-FAMILY RESIDENTIAL 17 UNITS OR MORE. AT 15.8% EFFICIENCY 1 SQUARE FOOT = 15 WATTS TOTAL 6KW/ 15 WATTS = TOTAL SQUARE FEET REQUIRED 400 SQUARE FEET REQUIRED IT CONSISTS OF ARRAYS OF 20 PANELS @ STANDARD 77"X39" (20.85 SF PER PANEL) EACH OPTION PROVIDES 417 SQUARE FEET 11 SCALE: ROOF PLAN 3/32" = 1'-0" 0 5 10 20 30 50 70 398 of 786 74 S.F. PRIVATE PATIO ## 74 S.F. PRIVATE PATIO ## SHARED RESIDENTIAL OPEN AREA ## 74 S.F. PRIVATE PATIO ## PRIVATE UP 20% COMPACT COMPACT COMPACT EV CAPABLE TURN AROUND ELECTRICAL ## EV CAPABLE UP 10% EV CAPABLE EV CAPABLE PROJECT NO: DATE DESCRIPTION C:\Users\JOSEPH~1\AppData\Local\Temp\AcPublish_2892\225684-A311-A316.DWG - Dec 22, 2025, 1:21pm - josephinek The "user(s)" in possession of this documentation acknowledge(s) that ARC TEC's and ARC TEC consultants' drawings, specifications, reports, electronic data and other documentation are instruments of service. ARC TEC and ARC TEC consultants shall be deemed the author and owner of such documentation. The "user(s)" in possession of this documentation shall not use or authorize any other person to use ARC TEC's or ARC TEC consultants' instruments of service. Reuse without ARC TEC's written authorization will be at the user(s) sole risk and without liability to ARC TEC and ARC TEC's consultants. The user(s) possessing this documentation shall indemnify and hold harmless ARC TEC and ARC TEC's consultants and agents and employees from and against all claims, damages losses and expenses, including but not limited to attorneys' fees, arising out of unauthorized reuse of ARC TEC o r ARC TEC' s c o n s u l t a n t s i n s tr ume n t s o f s e r v i c e . Written dimensions on this drawing shall have precedence over any scaled dimension. DO NOT SCALE THIS DRAWING for accurate dimensions and notify ARC TEC of any discrepancies. © Copyright ARC TEC, Inc. 2021 In Association with: A R C T E C ARCHITECTURAL TECHNOLOGIES www.arctecinc.com Arizona 2960 East Northern Avenue, Building C Phoenix, AZ 85028 602.953.2355 California 1731 Technology Drive, Suite 750 San Jose, CA 95110 408.496.0676 225684.11 A Planning Applicationt For:
NAZARETH VISTA
606 - 616 SOUTH B STREET
SAN MATEO, CA 94401 03.26.2025 SB330 APPLICATION 04.30.2025 1ST PLANNING SUBMITTAL 08.11.2025 2ND PLANNING SUBMITTAL 12.16.2025 3RD PLANNING SUBMITTAL PA-2024-039 12 A3.11 NORTH ELEVATION & PARTIAL FLOOR PLANS SCALE: PARTIAL FLOOR PLAN - LEVEL 01 3/32" = 1'-0" 3 0 5 10 20 30 50 70 SCALE: PARTIAL FLOOR PLAN - LEVEL 04 3/32" = 1'-0" 1 0 5 10 20 30 50 70 SCALE: EXTERIOR ELEVATION | NORTH - REAR 3/32" = 1'-0" 2 0 5 10 20 30 50 70 399 of 786 UP
DN UP PROJECT NO: DATE DESCRIPTION
C:\Users\JOSEPH~1\AppData\Local\Temp\AcPublish_2892\225684-A311-A316.DWG - Dec 22, 2025, 1:21pm - josephinek The "user(s)" in possession of this documentation acknowledge(s) that ARC TEC's and ARC TEC consultants' drawings, specifications, reports, electronic data and other documentation are instruments of service. ARC TEC and ARC TEC consultants shall be deemed the author and owner of such documentation. The "user(s)" in possession of this documentation shall not use or authorize any other person to use ARC TEC's or ARC TEC consultants' instruments of service. Reuse without ARC TEC's written authorization will be at the user(s) sole risk and without liability to ARC TEC and ARC TEC's consultants. The user(s) possessing this documentation shall indemnify and hold harmless ARC TEC and ARC TEC's consultants and agents and employees from and against all claims, damages losses and expenses, including but not limited to attorneys' fees, arising out of unauthorized reuse of ARC TEC o r ARC TEC' s c o n s u l t a n t s i n s tr ume n t s o f s e r v i c e . Written dimensions on this drawing shall have precedence over any scaled dimension. DO NOT SCALE THIS DRAWING for accurate dimensions and notify ARC TEC of any discrepancies. © Copyright ARC TEC, Inc. 2021 In Association with: A R C T E C ARCHITECTURAL TECHNOLOGIES www.arctecinc.com Arizona 2960 East Northern Avenue, Building C Phoenix, AZ 85028 602.953.2355 California 1731 Technology Drive, Suite 750 San Jose, CA 95110 408.496.0676 225684.11 A Planning Applicationt For:
NAZARETH VISTA
606 - 616 SOUTH B STREET
SAN MATEO, CA 94401 03.26.2025 SB330 APPLICATION 04.30.2025 1ST PLANNING SUBMITTAL 08.11.2025 2ND PLANNING SUBMITTAL 12.16.2025 3RD PLANNING SUBMITTAL PA-2024-039 12 A3.12 EAST ELEVATION & PARTIAL FLOOR PLANS SCALE: PARTIAL FLOOR PLAN - LEVEL 01 3/32" = 1'-0" 3 0 5 10 20 30 50 70 SCALE: PARTIAL FLOOR PLAN - LEVEL 04 3/32" = 1'-0" 1 0 5 10 20 30 50 70 SCALE: EXTERIOR ELEVATION | EAST - 6TH AVENUE 3/32" = 1'-0" 2 0 5 10 20 30 50 70 400 of 786 UP RETAIL ## RETAIL TRASH ## STAIR #02 ## RESI. FITNESS CENTER ## PROJECT NO: DATE DESCRIPTION C:\Users\JOSEPH~1\AppData\Local\Temp\AcPublish_2892\225684-A311-A316.DWG - Dec 22, 2025, 1:22pm - josephinek The "user(s)" in possession of this documentation acknowledge(s) that ARC TEC's and ARC TEC consultants' drawings, specifications, reports, electronic data and other documentation are instruments of service. ARC TECand ARC TEC consultants shall be deemed the author and owner of suchdocumentation. The "user(s)" in possession of this documentation shall not use or authorize any other person to use ARC TEC's or ARC TEC consultants' instruments of service. Reuse without ARC TEC's written authorization will beat the user(s) sole risk and without liability to ARC TEC and ARC TEC's consultants. The user(s) possessing this documentation shall indemnify and hold harmless ARC TEC and ARC TEC's consultants and agents and employees from and against all claims, damages losses and expenses, including but not limited to attorneys' fees, arising out of unauthorized reuse of ARC TEC o r ARC TEC' s c o n s u l t a n t s i n s tr ume n t s o f s e r v i c e . Written dimensions on this drawing shall have precedence over any scaled dimension. DO NOT SCALE THIS DRAWING for accurate dimensions and notify ARC TEC of any discrepancies. © Copyright ARC TEC, Inc. 2021 In Association with: A R C T E C ARCHITECTURAL TECHNOLOGIES www.arctecinc.com Arizona 2960 East Northern Avenue, Building C Phoenix, AZ 85028 602.953.2355 California 1731 Technology Drive, Suite 750 San Jose, CA 95110 408.496.0676 225684.11 A Planning Applicationt For:
NAZARETH VISTA
606 - 616 SOUTH B STREET
SAN MATEO, CA 94401 03.26.2025 SB330 APPLICATION 04.30.2025 1ST PLANNING SUBMITTAL 08.11.2025 2ND PLANNING SUBMITTAL 12.16.2025 3RD PLANNING SUBMITTAL PA-2024-039 12 A3.13 SOUTH ELEVATION & PARTIAL FLOOR PLANS SCALE: PARTIAL FLOOR PLAN - LEVEL 01 3/32" = 1'-0" 3 0 5 10 20 30 50 70 SCALE: PARTIAL FLOOR PLAN - LEVEL 04 3/32" = 1'-0" 1 0 5 10 20 30 50 70 SCALE: EXTERIOR ELEVATION | SOUTH - S. B STREET 3/32" = 1'-0" 2 0 5 10 20 30 50 70 401 of 786
UP
DN
UP
20%
UP
UP
10% PROJECT NO: DATE DESCRIPTION
C:\Users\JOSEPH~1\AppData\Local\Temp\AcPublish_2892\225684-A311-A316.DWG - Dec 22, 2025, 1:22pm - josephinek The "user(s)" in possession of this documentation acknowledge(s) that ARC TEC's and ARC TEC consultants' drawings, specifications, reports, electronic data and other documentation are instruments of service. ARC TEC and ARC TEC consultants shall be deemed the author and owner of such documentation. The "user(s)" in possession of this documentation shall not use or authorize any other person to use ARC TEC's or ARC TEC consultants' instruments of service. Reuse without ARC TEC's written authorization will be at the user(s) sole risk and without liability to ARC TEC and ARC TEC's consultants. The user(s) possessing this documentation shall indemnify and hold harmless ARC TEC and ARC TEC's consultants and agents and employees from and against all claims, damages losses and expenses, including but not limited to attorneys' fees, arising out of unauthorized reuse of ARC TEC o r ARC TEC' s c o n s u l t a n t s i n s tr ume n t s o f s e r v i c e . Written dimensions on this drawing shall have precedence over any scaled dimension. DO NOT SCALE THIS DRAWING for accurate dimensions and notify ARC TEC of any discrepancies. © Copyright ARC TEC, Inc. 2021 In Association with: A R C T E C ARCHITECTURAL TECHNOLOGIES www.arctecinc.com Arizona 2960 East Northern Avenue, Building C Phoenix, AZ 85028 602.953.2355 California 1731 Technology Drive, Suite 750 San Jose, CA 95110 408.496.0676 225684.11 A Planning Applicationt For:
NAZARETH VISTA
606 - 616 SOUTH B STREET
SAN MATEO, CA 94401 03.26.2025 SB330 APPLICATION 04.30.2025 1ST PLANNING SUBMITTAL 08.11.2025 2ND PLANNING SUBMITTAL 12.16.2025 3RD PLANNING SUBMITTAL PA-2024-039 12 A3.14 WEST ELEVATION & PARTIAL FLOOR PLANS SCALE: PARTIAL FLOOR PLAN - LEVEL 01 3/32" = 1'-0" 3 0 5 10 20 30 50 70 SCALE: PARTIAL FLOOR PLAN - LEVEL 04 3/32" = 1'-0" 1 0 5 10 20 30 50 70 SCALE: EXTERIOR ELEVATION | WEST - 7TH AVENUE 3/32" = 1'-0" 2 0 5 10 20 30 50 70 402 of 786 +14'-0" A.F.F. LEVEL 2 +0'-0" A.F.F. LEVEL 1 +84'-10" A.F.F. PLATE +24'-0" A.F.F. LEVEL 3 +34'-0" A.F.F. LEVEL 4 +44'-2" A.F.F. LEVEL 5 +54'-4" A.F.F. LEVEL 6 +64'-6" A.F.F. LEVEL 7 +74'-8" A.F.F. LEVEL 8 5 4 3 2.7 2.5 2.2 2 1 4 M1 5 W1 5 W1 6 P2 6 P1 3 G1 5 W1 3 G2 6 P1 16 P2 7 M5 12 4 M1 6 W1 20 6 P1 11 114 G2 3 P1 16 4 M1 13 6 P1 10 M4 4.5 17 20 +90'-10" A.F.F. T.O. SCREEN 23.22' LOWEST GRADE 84'-10" T.O. PLATE HEIGHT AT 6TH AVENUE FROM LOWEST GRADE POINT AT EXISTING SIDEWALK GRADE 22 22 92'-9" FROM LOWEST GRADE POINT TO HIGHEST TOP OF WALL +14'-0" A.F.F. LEVEL 2 +0'-0" A.F.F. LEVEL 1 +84'-10" A.F.F. PLATE +24'-0" A.F.F. LEVEL 3 +34'-0" A.F.F. LEVEL 4 +44'-2" A.F.F. LEVEL 5 +54'-4" A.F.F. LEVEL 6 +64'-6" A.F.F. LEVEL 7 +74'-8" A.F.F. LEVEL 8 21 5 W1 1 4 M1 4 M1 5 W1 5 W1 6 P2 6 P1 3 G1 5 W1 7 M5 6 P1 10 M4 13 6 P1 7 M5 6 P3 6 P2 6 P2 6 P3 5 W1 6 P1 6 P3 5 W1 6 P1 K J.1 J H.2 H G.4 G F.6 F E D.4 D B.6 C.1 C B.6 B.5 B.3 B A.6 A +90'-10" A.F.F. T.O. SCREEN FF 22.78' LOWEST GRADE 84'-10" T.O. PLATE HEIGHT AT 7TH AVENUE FROM LOWEST GRADE POINT AT EXISTING SIDEWALK GRADE 21 G1 G1 92'-9" FROM LOWEST GRADE POINT TO HIGHEST TOP OF WALL PROJECT NO: DATE DESCRIPTION C:\Users\JOSEPH~1\AppData\Local\Temp\AcPublish_2892\225684-A311-A316.DWG - Dec 22, 2025, 1:22pm - josephinek The "user(s)" in possession of this documentation acknowledge(s) that ARC TEC's and ARC TEC consultants' drawings, specifications, reports, electronic data and other documentation are instruments of service. ARC TEC and ARC TEC consultants shall be deemed the author and owner of such documentation. The "user(s)" in possession of this documentation shall not use or authorize any other person to use ARC TEC's or ARC TEC consultants' instruments of service. Reuse without ARC TEC's written authorization will be at the user(s) sole risk and without liability to ARC TEC and ARC TEC's consultants. The user(s) possessing this documentation shall indemnify and hold harmless ARC TEC and ARC TEC's consultants and agents and employees from and against all claims, damages losses and expenses, including but not limited to attorneys' fees, arising out of unauthorized reuse of ARC TEC o r ARC TEC' s c o n s u l t a n t s i n s tr ume n t s o f s e r v i c e . Written dimensions on this drawing shall have precedence over any scaled dimension. DO NOT SCALE THIS DRAWING for accurate dimensions and notify ARC TEC of any discrepancies. © Copyright ARC TEC, Inc. 2021 In Association with: A R C T E C ARCHITECTURAL TECHNOLOGIES www.arctecinc.com Arizona 2960 East Northern Avenue, Building C Phoenix, AZ 85028 602.953.2355 California 1731 Technology Drive, Suite 750 San Jose, CA 95110 408.496.0676 225684.11 A Planning Applicationt For:
NAZARETH VISTA
606 - 616 SOUTH B STREET
SAN MATEO, CA 94401 03.26.2025 SB330 APPLICATION 04.30.2025 1ST PLANNING SUBMITTAL 08.11.2025 2ND PLANNING SUBMITTAL 12.16.2025 3RD PLANNING SUBMITTAL PA-2024-039 12 SCALE: EXTERIOR ELEVATION | EAST - 6TH AVENUE 3/32" = 1'-0" 2 0 5 10 20 30 50 70 A3.15 EXTERIOR ELEVATIONS SCALE: EXTERIOR ELEVATION | NORTH - REAR 3/32" = 1'-0" 1 0 5 10 20 30 50 70 1 KEYNOTES . NOTE: NOT ALL KEYNOTES LISTED MAY APPLY TO THIS DRAWING. 2 ALUMINUM/GLASS EXTERIOR STORE FRONT SYSTEM - REFER TO SPECIFICATIONS ON THIS SHEET 4 EXTRUDED ALUMINUM CANOPY SYSTEM - REFER TO COLOR SPECIFICATION ON THIS SHEET 5 COMPOSITE WOOD CLADDING AND EXTERIOR SHEATHING OVER METAL STUD FRAMING 6 1" INSULATED GLAZING SYSTEM - REFER TO SPECIFICATIONS ON THIS SHEET PAINTED SMOOTH STUCCO FINISH AND EXTERIOR SHEATHING OVER METAL STUD FRAMING 7 EXISTING PROPERTY LINE 3 BALCONY RAILING SYSTEM - REFER TO COLOR SPECIFICATION ON THIS SHEET AND DETAILS ON SHEET A1.02 8 EXTERIOR ALUMINUM/ GLASS SLIDING DOOR SYSTEM - REFER TO COLOR SPECIFICATION ON THIS SHEET 9 EXTERIOR PAINTED STEEL DOOR AND H.M. FRAME - COLOR TO MATCH ADJACENT WALL FINISH COLOR 10 PARAPET WALL CAP FLASHING - REFER TO COLOR SPECIFICATION ON THIS SHEET 11 ENTRY TO PARKING STRUCTURE 12 PRIMARY RETAIL ENTRANCE 13 LOUVERED ROOF EQUIPMENT SCREEN. 5'-8" H x 2" DEEP HORIZONTAL BLADES. COLOR TO BE: ANODIC CLEAR REYNOBOND SERIES TWO - PREMIUM 2-COAT MICA FINISH. 14 BUILDING SIGNAGE - UNDER SEPARATE PERMIT 15 FITNESS CENTER ENTRANCE - RESIDENT ONLY 16 PARKING GARAGE STRUCTURAL CONCRETE COLUMN 17 SERVICE DOOR 18 RESIDENTIAL LOBBY ENTRANCE 19 COMPOSITE ALUMINUM CLADDING AND EXTERIOR SHEATHING OVER METAL STUD FRAMING 20 EGRESS DOOR 21 SPANDREL GLASS OVER FIRE RATED WALL ASSEMBLY 22 FRITTED GLASS 2 MATERIAL PALETTE G1 TYPE: 1" INSULATED EXTERIOR GLAZING COLOR: DARK BLUE TINT PRODUCT REF.: BLUE GLAZING TYPE (RETAIL ONLY): VIRACON 1" INSTULATED VE27-2M (14" PACIFICA WITH VE-2M#2 - 1/2" AIRSPACE - 1/4" CLEAR). * GLAZING SPECIFIED INDICATES GENERAL TONE AND COLOR. FINAL PERCEIVED COLOR AND CLARITY WILL VARY DEPENDING ON 1" INSULATED GLAZING SPECIFICATION TO BE DETERMINED AT TIME OF CONSTRUCTION DOCUMENTATION. W1 TYPE: COMPOSITE CLADDING SYSTEM COLOR: CINDER BLOCK TEK PRODUCT REF.: PARKLEX PRODEMA M1 TYPE: EXTRUDED ALUMINUM CANOPY SYSTEM COLOR: NIGHTFALL METALLIC PRODUCT REF.: REYNOBOND SERIES THREE - PREMIUM 3-COAT METALLIC FINISH P1 TYPE: EXTERIOR PAINT COLOR: WHITE SNOW PRODUCT REF.: SHERWIN WILLIAMS - SW9541 M2 TYPE: EXTERIOR ALUM./ GLASS STOREFRONT DOOR & WINDOW FRAME COLOR: ANODIZED PLUS - YK1N BLACK PRODUCT REF.: YKK AP YES 40FI COMMERCIAL STOREFRONT SYSTEM CENTER SET FLUSH GLAZING WITH 1" INSULATED GLASS. ANY OTHER PRODUCT COMPLYING WITH BASIS OF DESIGN TO BE SUBMITTED FOR FURTHER APPROVAL. P2 TYPE: EXTERIOR PAINT COLOR: FAWN BRINDLE PRODUCT REF.: SHERWIN WILLIAMS - SW7640 G2 TYPE: 1" INSULATED EXTERIOR GLAZING COLOR: LIGHT BLUE TINT PRODUCT REF.: LOW TINT: VIRACON1" INSULATED VRE1-4725-OITC30 (14" CLEAR WITH VRE-4725 #2 - 12" AIRSPACE - 14" CLEAR HS). M3 TYPE: EXTERIOR ALUM./ GLASS SLIDING DOORS COLOR: ANODIZED PLUS - YK1N BLACK PRODUCT REF.: YKK AP SLIDING DOORS - TWO OR THREE PANELS M4 TYPE: PARAPET WALL CAP COLOR: NIGHTFALL METALLIC PRODUCT REF.: REYNOBOND SERIES THREE - PREMIUM 3-COAT METALLIC FINISH M5 TYPE: BALCONY RAILING SYSTEM COLOR: NIGHTFALL METALLIC PRODUCT REF.: REYNOBOND SERIES THREE - PREMIUM 3-COAT METALLIC FINISH M6 TYPE: ARCHITECTURE COMPOSITE ALUMINUM CLADDING COLOR: NIGHTFALL METALLIC PRODUCT REF.: REYNOBOND SERIES THREE - PREMIUM 3-COAT METALLIC FINISH P3 TYPE: EXTERIOR PAINT COLOR: MOUNTAIN ROAD PRODUCT REF.: SHERWIN WILLIAMS - SW7743 2 2 2 2 2 2 2 2 2 2 403 of 786 +14'-0" A.F.F. LEVEL 2 +0'-0" A.F.F. LEVEL 1 +84'-10" A.F.F. PLATE +24'-0" A.F.F. LEVEL 3 +34'-0" A.F.F. LEVEL 4 +44'-2" A.F.F. LEVEL 5 +54'-4" A.F.F. LEVEL 6 +64'-6" A.F.F. LEVEL 7 +74'-8" A.F.F. LEVEL 8 15 12 12 4 M1 4 M1 12 5 W1 3 G1 6 P1 12 4 M1 1 6 P14 M15 W15 W16 P26 P13 G15 W13 G2
7 M5 6 P1 10 M4 13
4 M1 14 14 6 P1 16 P1
A A.6
B B.3 B.5 B.6
C C.1 B.6
D D.4
E
F F.6
G G.4
H H.2
J J.1
K
1 +90'-10" A.F.F. T.O. SCREEN FF 22.31' LOWEST GRADE
84'-10" T.O. PLATE HEIGHT AT S. B STREET FROM LOWEST GRADE POINT AT EXISTING SIDEWALK GRADE 22 22 92'-9" FROM LOWEST GRADE POINT TO HIGHEST TOP OF WALL +14'-0" A.F.F. LEVEL 2 +0'-0" A.F.F. LEVEL 1 +84'-10" A.F.F. PLATE +24'-0" A.F.F. LEVEL 3 +34'-0" A.F.F. LEVEL 4 +44'-2" A.F.F. LEVEL 5 +54'-4" A.F.F. LEVEL 6 +64'-6" A.F.F. LEVEL 7 +74'-8" A.F.F. LEVEL 8 1 2 2.2 2.5 2.7
3 4
5 4 M1 15 4 M1 13
4 M15 W15 W16 P26 P13 G15 W13 G2 16 P11 11 17 6 P2 18 5 W1 4 M1 1 M5 7 P2 6
6 P1 10 M4 7 M5 19 M6
6 P1 G2 3 4.5
5 W1 +90'-10" A.F.F. T.O. SCREEN 22.09' LOWEST GRADE
84'-10" T.O. PLATE HEIGHT AT 7TH AVENUE FROM LOWEST GRADE POINT AT EXISTING LOWEST GRADE 22 22 86'-1" FROM LOWEST GRADE POINT TO HIGHEST TOP OF WALL PROJECT NO: DATE DESCRIPTION C:\Users\JOSEPH~1\AppData\Local\Temp\AcPublish_2892\225684-A311-A316.DWG - Dec 22, 2025, 1:22pm - josephinek The "user(s)" in possession of this documentation acknowledge(s) that ARC TEC's and ARC TEC consultants' drawings, specifications, reports, electronic data and other documentation are instruments of service. ARC TECand ARC TEC consultants shall be deemed the author and owner of suchdocumentation. The "user(s)" in possession of this documentation shall not use or authorize any other person to use ARC TEC's or ARC TEC consultants' instruments of service. Reuse without ARC TEC's written authorization will beat the user(s) sole risk and without liability to ARC TEC and ARC TEC's consultants. The user(s) possessing this documentation shall indemnify and hold harmless ARC TEC and ARC TEC's consultants and agents and employees from and against all claims, damages losses and expenses, including but not limited to attorneys' fees, arising out of unauthorized reuse of ARC TEC o r ARC TEC' s c o n s u l t a n t s i n s tr ume n t s o f s e r v i c e . Written dimensions on this drawing shall have precedence over any scaled dimension. DO NOT SCALE THIS DRAWING for accurate dimensions and notify ARC TEC of any discrepancies. © Copyright ARC TEC, Inc. 2021 In Association with: A R C T E C ARCHITECTURAL TECHNOLOGIES www.arctecinc.com Arizona 2960 East Northern Avenue, Building C Phoenix, AZ 85028 602.953.2355 California 1731 Technology Drive, Suite 750 San Jose, CA 95110 408.496.0676 225684.11 A Planning Applicationt For:
NAZARETH VISTA
606 - 616 SOUTH B STREET
SAN MATEO, CA 94401 03.26.2025 SB330 APPLICATION 04.30.2025 1ST PLANNING SUBMITTAL 08.11.2025 2ND PLANNING SUBMITTAL 12.16.2025 3RD PLANNING SUBMITTAL PA-2024-039 12 A3.16 EXTERIOR ELEVATIONS SCALE: EXTERIOR ELEVATION | WEST - 7TH AVENUE 3/32" = 1'-0" 2 0 5 10 20 30 50 70 SCALE: EXTERIOR ELEVATION | SOUTH - S. B. STREET 3/32" = 1'-0" 1 0 5 10 20 30 50 70
1 KEYNOTES . NOTE: NOT ALL KEYNOTES LISTED MAY APPLY TO THIS DRAWING. 2 ALUMINUM/GLASS EXTERIOR STORE FRONT SYSTEM - REFER TO SPECIFICATIONS ON THIS SHEET4 EXTRUDED ALUMINUM CANOPY SYSTEM - REFER TO COLOR SPECIFICATION ON THIS SHEET5 COMPOSITE WOOD CLADDING AND EXTERIOR SHEATHING OVER METAL STUD FRAMING6 1" INSULATED GLAZING SYSTEM - REFER TO SPECIFICATIONS ON THIS SHEET PAINTED SMOOTH STUCCO FINISH AND EXTERIOR SHEATHING OVER METAL STUD FRAMING7 EXISTING PROPERTY LINE3 BALCONY RAILING SYSTEM - REFER TO COLOR SPECIFICATION ON THIS SHEET AND DETAILS ON SHEET A1.028 EXTERIOR ALUMINUM/ GLASS SLIDING DOOR SYSTEM - REFER TO COLOR SPECIFICATION ON THIS SHEET9 EXTERIOR PAINTED STEEL DOOR AND H.M. FRAME - COLOR TO MATCH ADJACENT WALL FINISH COLOR 10 PARAPET WALL CAP FLASHING - REFER TO COLOR SPECIFICATION ON THIS SHEET 11 ENTRY TO PARKING STRUCTURE 12 PRIMARY RETAIL ENTRANCE 13 LOUVERED ROOF EQUIPMENT SCREEN. 5'-8" H x 2" DEEP HORIZONTAL BLADES. COLOR TO BE: ANODIC CLEAR REYNOBOND SERIES TWO - PREMIUM 2-COAT MICA FINISH. 14 BUILDING SIGNAGE - UNDER SEPARATE PERMIT 15 FITNESS CENTER ENTRANCE - RESIDENT ONLY 16 PARKING GARAGE STRUCTURAL CONCRETE COLUMN 17 SERVICE DOOR 18 RESIDENTIAL LOBBY ENTRANCE 19 COMPOSITE ALUMINUM CLADDING AND EXTERIOR SHEATHING OVER METAL STUD FRAMING 20 EGRESS DOOR 21 SPANDREL GLASS OVER FIRE RATED WALL ASSEMBLY 22 FRITTED GLASS 2 MATERIAL PALETTE G1 TYPE: 1" INSULATED EXTERIOR GLAZING COLOR: DARK BLUE TINT PRODUCT REF.: BLUE GLAZING TYPE (RETAIL ONLY): VIRACON 1" INSTULATED VE27-2M (1 4" PACIFICA WITH VE-2M#2 - 1/2" AIRSPACE - 1/4" CLEAR). * GLAZING SPECIFIED INDICATES GENERAL TONE AND COLOR. FINAL PERCEIVED COLOR AND CLARITY WILL VARY DEPENDING ON 1" INSULATED GLAZING SPECIFICATION TO BE DETERMINED AT TIME OF CONSTRUCTION DOCUMENTATION. W1 TYPE: COMPOSITE CLADDING SYSTEM COLOR: CINDER BLOCK TEK PRODUCT REF.: PARKLEX PRODEMA M1 TYPE: EXTRUDED ALUMINUM CANOPY SYSTEM COLOR: NIGHTFALL METALLIC PRODUCT REF.: REYNOBOND SERIES THREE - PREMIUM 3-COAT METALLIC FINISH P1 TYPE: EXTERIOR PAINT COLOR: WHITE SNOW PRODUCT REF.: SHERWIN WILLIAMS - SW9541 M2 TYPE: EXTERIOR ALUM./ GLASS STOREFRONT DOOR & WINDOW FRAME COLOR: ANODIZED PLUS - YK1N BLACK PRODUCT REF.: YKK AP YES 40FI COMMERCIAL STOREFRONT SYSTEM CENTER SET FLUSH GLAZING WITH 1" INSULATED GLASS. ANY OTHER PRODUCT COMPLYING WITH BASIS OF DESIGN TO BE SUBMITTED FOR FURTHER APPROVAL. P2 TYPE: EXTERIOR PAINT COLOR: FAWN BRINDLE PRODUCT REF.: SHERWIN WILLIAMS - SW7640 G2 TYPE: 1" INSULATED EXTERIOR GLAZING COLOR: LIGHT BLUE TINT PRODUCT REF.: LOW TINT: VIRACON1" INSULATED VRE1-4725-OITC30 (1 4" CLEAR WITH VRE-4725 #2 - 1
2" AIRSPACE - 1
4" CLEAR HS). M3 TYPE: EXTERIOR ALUM./ GLASS SLIDING DOORS COLOR: ANODIZED PLUS - YK1N BLACK PRODUCT REF.: YKK AP SLIDING DOORS - TWO OR THREE PANELS M4 TYPE: PARAPET WALL CAP COLOR: NIGHTFALL METALLIC PRODUCT REF.: REYNOBOND SERIES THREE - PREMIUM 3-COAT METALLIC FINISH M5 TYPE: BALCONY RAILING SYSTEM COLOR: NIGHTFALL METALLIC PRODUCT REF.: REYNOBOND SERIES THREE - PREMIUM 3-COAT METALLIC FINISH M6 TYPE: ARCHITECTURE COMPOSITE ALUMINUM CLADDING COLOR: NIGHTFALL METALLIC PRODUCT REF.: REYNOBOND SERIES THREE - PREMIUM 3-COAT METALLIC FINISH P3 TYPE: EXTERIOR PAINT COLOR: MOUNTAIN ROAD PRODUCT REF.: SHERWIN WILLIAMS - SW7743 2 2
2 2
2 2
2 404 of 786
+14'-0" A.F.F. LEVEL 2 +0'-0" A.F.F. LEVEL 1 +84'-10" A.F.F. PLATE +24'-0" A.F.F. LEVEL 3 +34'-0" A.F.F. LEVEL 4 +44'-2" A.F.F. LEVEL 5 +54'-4" A.F.F. LEVEL 6 +64'-6" A.F.F. LEVEL 7 +74'-8" A.F.F. LEVEL 8 15 12 12 4 M1 4 M1 12 5 W1 3 G1 6 P1 12 4 M1 1 6 P1 4 M1 5 W1 5 W1 6 P2 6 P1 3 G1 5 W1 3 G2 7 M5 6 P1 10 M4 13 4 M1 14 14 6 P1 16 P1 A A.6 B B.3 B.5 B.6 C C.1 B.6 D D.4 E F F.6 G G.4 H H.2 J J.1 K 1 +90'-10" A.F.F. T.O. SCREEN FF 22.31' LOWEST GRADE 84'-10" T.O. PLATE HEIGHT AT S. B STREET FROM LOWEST GRADE POINT AT EXISTING SIDEWALK GRADE 22 22 92'-9" FROM LOWEST GRADE POINT TO HIGHEST TOP OF WALL PROJECT NO: DATE DESCRIPTION Q:\2022 Jobs\225684 - Nazareth Vista Mixed-Use\01-Planning App\2025-MMDD 3RD PLANNING SUBMITTAL\225684-A311-A316.DWG - Dec 22, 2025, 2:10pm - fabianb The "user(s)" in possession of this documentation acknowledge(s) that ARC TEC's and ARC TEC consultants' drawings, specifications, reports, electronic data and other documentation are instruments of service. ARC TEC and ARC TEC consultants shall be deemed the author and owner of such documentation. The "user(s)" in possession of this documentation shall not use or authorize any other person to use ARC TEC's or ARC TEC consultants' instruments of service. Reuse without ARC TEC's written authorization will be at the user(s) sole risk and without liability to ARC TEC and ARC TEC's consultants. The user(s) possessing this documentation shall indemnify and hold harmless ARC TEC and ARC TEC's consultants and agents and employees from and against all claims, damages losses and expenses, including but not limited to attorneys' fees, arising out of unauthorized reuse of ARC TEC o r ARC TEC' s c o n s u l t a n t s i n s tr ume n t s o f s e r v i c e . Written dimensions on this drawing shall have precedence over any scaled dimension. DO NOT SCALE THIS DRAWING for accurate dimensions and notify ARC TEC of any discrepancies. © Copyright ARC TEC, Inc. 2021 In Association with: A R C T E C ARCHITECTURAL TECHNOLOGIES www.arctecinc.com Arizona 2960 East Northern Avenue, Building C Phoenix, AZ 85028 602.953.2355 California 1731 Technology Drive, Suite 750 San Jose, CA 95110 408.496.0676 225684.11 A Planning Applicationt For:
NAZARETH VISTA
606 - 616 SOUTH B STREET
SAN MATEO, CA 94401 03.26.2025 SB330 APPLICATION 04.30.2025 1ST PLANNING SUBMITTAL 08.11.2025 2ND PLANNING SUBMITTAL 12.16.2025 3RD PLANNING SUBMITTAL PA-2024-039 12 A3.17 FINISHES SCALE: EXTERIOR ELEVATION | SOUTH - S. B. STREET 3/32" = 1'-0" 1 0 5 10 20 30 50 70 1 KEYNOTES . NOTE: NOT ALL KEYNOTES LISTED MAY APPLY TO THIS DRAWING. 2 ALUMINUM/GLASS EXTERIOR STORE FRONT SYSTEM - REFER TO SPECIFICATIONS ON THIS SHEET 4 EXTRUDED ALUMINUM CANOPY SYSTEM - REFER TO COLOR SPECIFICATION ON THIS SHEET 5 COMPOSITE WOOD CLADDING AND EXTERIOR SHEATHING OVER METAL STUD FRAMING 6 1" INSULATED GLAZING SYSTEM - REFER TO SPECIFICATIONS ON THIS SHEET PAINTED SMOOTH STUCCO FINISH AND EXTERIOR SHEATHING OVER METAL STUD FRAMING 7 EXISTING PROPERTY LINE 3 BALCONY RAILING SYSTEM - REFER TO COLOR SPECIFICATION ON THIS SHEET AND DETAILS ON SHEET A1.02 8 EXTERIOR ALUMINUM/ GLASS SLIDING DOOR SYSTEM - REFER TO COLOR SPECIFICATION ON THIS SHEET 9 EXTERIOR PAINTED STEEL DOOR AND H.M. FRAME - COLOR TO MATCH ADJACENT WALL FINISH COLOR 10 PARAPET WALL CAP FLASHING - REFER TO COLOR SPECIFICATION ON THIS SHEET 11 ENTRY TO PARKING STRUCTURE 12 PRIMARY RETAIL ENTRANCE 13 LOUVERED ROOF EQUIPMENT SCREEN. 5'-8" H x 2" DEEP HORIZONTAL BLADES. COLOR TO BE: ANODIC CLEAR REYNOBOND SERIES TWO - PREMIUM 2-COAT MICA FINISH. 14 BUILDING SIGNAGE - UNDER SEPARATE PERMIT 15 FITNESS CENTER ENTRANCE - RESIDENT ONLY 16 PARKING GARAGE STRUCTURAL CONCRETE COLUMN 17 SERVICE DOOR 18 RESIDENTIAL LOBBY ENTRANCE 19 COMPOSITE ALUMINUM CLADDING AND EXTERIOR SHEATHING OVER METAL STUD FRAMING 20 EGRESS DOOR 21 SPANDREL GLASS OVER FIRE RATED WALL ASSEMBLY 22 FRITTED GLASS 2 MATERIAL PALETTE G1 TYPE: 1" INSULATED EXTERIOR GLAZING COLOR: DARK BLUE TINT PRODUCT REF.: BLUE GLAZING TYPE (RETAIL ONLY): VIRACON 1" INSTULATED VE27-2M (14" PACIFICA WITH VE-2M#2 - 1/2" AIRSPACE - 1/4" CLEAR). * GLAZING SPECIFIED INDICATES GENERAL TONE AND COLOR. FINAL PERCEIVED COLOR AND CLARITY WILL VARY DEPENDING ON 1" INSULATED GLAZING SPECIFICATION TO BE DETERMINED AT TIME OF CONSTRUCTION DOCUMENTATION. W1 TYPE: COMPOSITE CLADDING SYSTEM COLOR: CINDER BLOCK TEK PRODUCT REF.: PARKLEX PRODEMA M1 TYPE: EXTRUDED ALUMINUM CANOPY SYSTEM COLOR: NIGHTFALL METALLIC PRODUCT REF.: REYNOBOND SERIES THREE - PREMIUM 3-COAT METALLIC FINISH P1 TYPE: EXTERIOR PAINT COLOR: WHITE SNOW PRODUCT REF.: SHERWIN WILLIAMS - SW9541 M2 TYPE: EXTERIOR ALUM./ GLASS STOREFRONT DOOR & WINDOW FRAME COLOR: ANODIZED PLUS - YK1N BLACK PRODUCT REF.: YKK AP YES 40FI COMMERCIAL STOREFRONT SYSTEM CENTER SET FLUSH GLAZING WITH 1" INSULATED GLASS. ANY OTHER PRODUCT COMPLYING WITH BASIS OF DESIGN TO BE SUBMITTED FOR FURTHER APPROVAL. P2 TYPE: EXTERIOR PAINT COLOR: FAWN BRINDLE PRODUCT REF.: SHERWIN WILLIAMS - SW7640 G2 TYPE: 1" INSULATED EXTERIOR GLAZING COLOR: LIGHT BLUE TINT PRODUCT REF.: LOW TINT: VIRACON1" INSULATED VRE1-4725-OITC30 (14" CLEAR WITH VRE-4725 #2 - 12" AIRSPACE - 14" CLEAR HS). M3 TYPE: EXTERIOR ALUM./ GLASS SLIDING DOORS COLOR: ANODIZED PLUS - YK1N BLACK PRODUCT REF.: YKK AP SLIDING DOORS - TWO OR THREE PANELS M4 TYPE: PARAPET WALL CAP COLOR: NIGHTFALL METALLIC PRODUCT REF.: REYNOBOND SERIES THREE - PREMIUM 3-COAT METALLIC FINISH M5 TYPE: BALCONY RAILING SYSTEM COLOR: NIGHTFALL METALLIC PRODUCT REF.: REYNOBOND SERIES THREE - PREMIUM 3-COAT METALLIC FINISH M6 TYPE: ARCHITECTURE COMPOSITE ALUMINUM CLADDING COLOR: NIGHTFALL METALLIC PRODUCT REF.: REYNOBOND SERIES THREE - PREMIUM 3-COAT METALLIC FINISH P3 TYPE: EXTERIOR PAINT COLOR: MOUNTAIN ROAD G1 PRODUCT REF.: SHERWIN WILLIAMS - SW7743 M1 M2 P2 SCALE: MATERIALSNTS 2 G2 P1 W1 M4 M5 M6 M3 P3 2 2 405 of 786 +14'-0" A.F.F.
LEVEL 2+0'-0" A.F.F.LEVEL 1+84'-10" A.F.F.PLATE+24'-0" A.F.F.LEVEL 3+34'-0" A.F.F.LEVEL 4+44'-2" A.F.F.LEVEL 5+54'-4" A.F.F.LEVEL 6+64'-6" A.F.F.LEVEL 7+74'-8" A.F.F.LEVEL 8 35'-9" 25'-11" 25'-11" 55'-2" 25'-11" 25'-10" 36'-3"
MEETS 7.1.1.B FACADE DESIGN AT 25'-50' INTERVALS USING CHANGE IN MATERIALS BETWEEN STUCCO AND GLASS +14'-0" A.F.F.LEVEL 2+0'-0" A.F.F.LEVEL 1+84'-10" A.F.F.PLATE+24'-0" A.F.F.LEVEL 3+34'-0" A.F.F.LEVEL 4+44'-2" A.F.F.LEVEL 5+54'-4" A.F.F.LEVEL 6+64'-6" A.F.F.LEVEL 7+74'-8" A.F.F.LEVEL 8 PROJECT NO:
DATE DESCRIPTION
Q:\2022 Jobs\225684 - Nazareth Vista Mixed-Use\01-Planning App\2026-MMDD 4th PLANNING SUBMITTAL\225684-A318.dwg - Mar 25, 2026, 3:31pm - evans The "user(s)" in possession of this documentation acknowledge(s) thatARC TEC's and ARC TEC consultants' drawings, specifications, reports, electronic data and other documentation are instruments of service. ARC TEC and ARC TEC consultants shall be deemed the author and owner of suchdocumentation. The "user(s)" in possession of this documentation shall not use or authorize any other person to use ARC TEC's or ARC TEC consultants' instruments of service. Reuse without ARC TEC's written authorization will be at the user(s) sole risk and without liability to ARC TEC and ARC TEC's consultants. The user(s) possessing this documentation shall indemnify and hold harmless ARC TEC and ARC TEC's consultants and agents and employees from and against all claims, damages losses and expenses, including but not limited to attorneys' fees, arising out of unauthorized reuse of ARC TEC o r ARC TEC' s c o n su lt a n t s i n s tr ume n t s o f s e r v i c e . Written dimensions on this drawing shall have precedence over any scaleddimension. DO NOT SCALE THIS DRAWING for accurate dimensions and notify ARC TEC of any discrepancies.
© Copyright ARC TEC, Inc. 2021
In Association with:
A R C T E C
ARCHITECTURAL TECHNOLOGIES
www.arctecinc.com
Arizona
2960 East Northern Avenue, Building C
Phoenix, AZ 85028 602.953.2355
California
1731 Technology Drive, Suite 750
San Jose, CA 95110 408.496.0676
225684.11
A Planning Applicationt For:
NAZARETH VISTA
606 - 616 SOUTH B STREET
SAN MATEO, CA 94401
03.26.2025 SB330 APPLICATION04.30.2025 1ST PLANNING SUBMITTAL08.11.2025 2ND PLANNING SUBMITTAL12.16.2025 3RD PLANNING SUBMITTAL03.26.2026 4TH PLANNING SUBMITTAL PA-2024-039
12 A3.18A
OBJECTIVE DESIGN STANDARDS
SCALE:
EXTERIOR ELEVATION | SOUTH - S. B. STREET
3/32" = 1'-0" 1
0 5 10 20 30 50 70
4.1.2 ARTICULATION DETAILS
BALCONIES PER UNIT
4.1.2 ARTICULATION DETAILS4" WINDOW RECESSES
BASE BODY TOP
4-STORY 3-STORY 1-STORY 4.1.6A MASSING BREAKS 3-STORY BASE 4.1.6A MASSING BREAKS 4-STORY BODY 4.1.6A MASSING BREAKS 1-STORY TOP CHANGE OF BUILDING MATERIALS STEPBACK WITH PROJECTED ROOF OVERHANG 4.1.6B MASSING BREAKS CHANGE IN BUILDING MATERIAL AND COLOR BETWEEN BASE AND BODY
4.1.6B MASSING BREAKS
10 FT STEPBACK AT THE TOP FLOOR
4.1.6C BUILDING CORNER TREATMENT
SPECIAL TREATMENT OF EITHER DIFFERENT
EXTERIOR MATERIALS
4.1.2 ARTICULATION DETAILS
6 FT WALL RECESSES AT BALCONY
4.1.3 BUILDING MATERIALS AND COLORA CHANGE IN COLOR AND MATERIALS W/ 6" OFFSET4.1.3 BUILDING MATERIALS AND COLOR
CHANGE OF MATERIALS DOES NOT END AT THEOUTSIDE EXTERIOR CORNER
4.2 GROUND FLOOR REQUIREMENTS - MIXED-USE
12 FT FINISHED FLOOR TO CEILING HEIGHT FOR
GROUND FLOOR RETAIL/ COMMERCIAL USES
4.3.1 CONSISTENT DESIGN
PRIMARY MATERIAL ON ALL STREET ELEVATIONSPRIMARY COLOR ON ALL STREET ELEVATIONS
WINDOW DETAILS AND PROPORTIONS
REPEATING RECESS DEPTH
SCALE:
EXTERIOR ELEVATION | WEST - 7th STREET
3/32" = 1'-0" 2
0 5 10 20 30 50 70
BASE BODY TOP
4-STORY 3-STORY 1-STORY
3.2.3 PARKING ENTRANCE AND CURB CUTS
LOCATED ON THE SECONDARY STREET FRONTAGE
4.3.2 DIFFERENTIATE BETWEEN RESIDENTIAL AND COMMERCIAL USE
DISTINCT CANOPY
3.2.4 INTEGRATED PARKING STRUCTURE
GROUND-LEVEL SCREENING
4.1.2 ARTICULATION DETAILSARCHITECTURAL PROJECTION4.3.2 DIFFERENTIATE BETWEEN RESIDENTIALAND COMMERCIAL USE
DISTINCT CANOPY
4.1.6B FLAT PLANE VARIATION - MASSING BRAKES
CHANGE OF MATERIALS AND COLORS
4.2 GROUND FLOOR REQUIREMENTS - MIXED-USE
GLAZING AT 75% OF THE GROUND FLOOR COMMERCIAL
WALL AREA
4.1.3 BUILDING MATERIALS AND COLOR
COMBINATION OF THREE DIFFERENT COLORS/ MATERIALS
4.3.1 CONSISTENT DESIGN
REPEATING RECESS DEPTH
4.6.1 WINDOW AND DOOR ALIGNMENTVERTICAL ALIGNMENT
HORIZONTAL ALIGNMENT
4.6.2 WINDOWS - DEPTH
3" RECESS FROM EXTERIOR WALL
4.6.3 WINDOWS - REFLECTIVITY, TRANSPARENCY
USE OF BLUE TINT GLASS, NO REFLECTIVE GLASSUSE OF WINDOW TRIM/ PROJECTED SILL
4.6.3 WINDOWS - REFLECTIVITY, TRANSPARENCY, AND DETAILS
CONSISTENT SIZE AND PROPORTION AMONG WINDOWS IN A GROUP
4.6.5 ENTRIES, DOORS AND STAIRWAYS
MAIN ENTRY FRONTING THE PRIMARY
STREET FRONTAGE
4.6.5 ENTRIES, DOORS AND STAIRWAYS
MAIN ENTRY FRONTING THE PRIMARY
STREET FRONTAGE
4.6.5 ENTRIES, DOORS AND STAIRWAYS
ENTRY ELEMENT MORE THAN 3FT IN DEPTH
TRANSOM WINDOWS, SIDELITE WINDOW, COVERED ENTRANCE
AND RECESSED ENTRY
4.1.2 ARTICULATION DETAILS
BALCONIES PER UNIT
4.1.2 ARTICULATION DETAILS4" WINDOW RECESSES4.1.6A MASSING BREAKS 3-STORY BASE
4.1.6A MASSING BREAKS4-STORY BODY4.1.6A MASSING BREAKS
1-STORY TOP
CHANGE OF BUILDING MATERIALSSTEPBACK WITH PROJECTED ROOF OVERHANG
4.1.6B MASSING BREAKS
CHANGE IN BUILDING MATERIAL
AND COLOR BETWEEN BASE AND BODY
4.1.6C BUILDING CORNER TREATMENT
SPECIAL TREATMENT OF EITHER DIFFERENT
EXTERIOR MATERIALS
4.1.3 BUILDING MATERIALS AND COLOR
A CHANGE IN COLOR AND MATERIALS W/ 6" OFFSET
4.1.3 BUILDING MATERIALS AND COLOR
CHANGE OF MATERIALS DOES NOT END AT THEOUTSIDE EXTERIOR CORNER
4.3.2 DIFFERENTIATE BETWEEN RESIDENTIAL
AND COMMERCIAL USE
DISTINCT CANOPY
4.1.6B FLAT PLANE VARIATION - MASSING BRAKES
CHANGE OF MATERIALS AND COLORS
4.1.3 BUILDING MATERIALS AND COLOR
COMBINATION OF THREE DIFFERENT COLORS/ MATERIALS
4.3.1 CONSISTENT DESIGN
REPEATING RECESS DEPTH
4.1.2 ARTICULATION DETAILSARCHITECTURAL PROJECTION
4.1.2 ARTICULATION DETAILS
6 FT WALL RECESSES AT BALCONY
4.6.1 WINDOW AND DOOR ALIGNMENTVERTICAL ALIGNMENT
HORIZONTAL ALIGNMENT
4.6.2 WINDOWS - DEPTH
3" RECESS FROM EXTERIOR WALL
3 406 of 786
PROJECT NO:
DATE DESCRIPTION
Q:\2022 Jobs\225684 - Nazareth Vista Mixed-Use\01-Planning App\2026-MMDD 4th PLANNING SUBMITTAL\225684-A318.dwg - Mar 25, 2026, 3:30pm - evans The "user(s)" in possession of this documentation acknowledge(s) thatARC TEC's and ARC TEC consultants' drawings, specifications, reports, electronic data and other documentation are instruments of service. ARC TEC and ARC TEC consultants shall be deemed the author and owner of suchdocumentation. The "user(s)" in possession of this documentation shall not use or authorize any other person to use ARC TEC's or ARC TEC consultants' instruments of service. Reuse without ARC TEC's written authorization will be at the user(s) sole risk and without liability to ARC TEC and ARC TEC's consultants. The user(s) possessing this documentation shall indemnify and hold harmless ARC TEC and ARC TEC's consultants and agents and employees from and against all claims, damages losses and expenses, including but not limited to attorneys' fees, arising out of unauthorized reuse of ARC TEC o r ARC TEC' s c o n su lt a n t s i n s tr ume n t s o f s e r v i c e . Written dimensions on this drawing shall have precedence over any scaleddimension. DO NOT SCALE THIS DRAWING for accurate dimensions and notify ARC TEC of any discrepancies.
© Copyright ARC TEC, Inc. 2021
In Association with:
A R C T E C
ARCHITECTURAL TECHNOLOGIES
www.arctecinc.com
Arizona
2960 East Northern Avenue, Building C
Phoenix, AZ 85028 602.953.2355
California
1731 Technology Drive, Suite 750
San Jose, CA 95110 408.496.0676
225684.11
A Planning Applicationt For:
NAZARETH VISTA
606 - 616 SOUTH B STREET
SAN MATEO, CA 94401
03.26.2025 SB330 APPLICATION04.30.2025 1ST PLANNING SUBMITTAL08.11.2025 2ND PLANNING SUBMITTAL12.16.2025 3RD PLANNING SUBMITTAL03.26.2026 4TH PLANNING SUBMITTAL PA-2024-039
12 A3.18B
OBJECTIVE DESIGN STANDARDS
SCALE:
7.1.1.C
EXTERIOR ELEVATION | SOUTH - S. B. STREET
3/32" = 1'-0" 1
0 5 10 20 30 50 70
7.1.1.C.4 ALIGNMENT AT CANOPIES
ALIGNMENT AT FLOOR ELEMENTS
7.1.1.C.5 ALIGNMENT AT BASE7.1.1.C.2 ALIGNMENT AT RETAIL WINDOWS 3 3
407 of 786
A3.19 IMAGERY 1" INSULATED EXTERIOR GLAZING LIGHT BLUE TINT 1" INSULATED EXTERIOR GLAZING DARK BLUE TINT SECOND/ FIFTH FLOOR DECK AND RESIDENTIAL BALCONY RAILING SYSTEM EXTERIOR RESIDENTIAL SLIDING DOOR SYSTEM ARCHITECTURE COMPOSITE ALUMINUM CLADDING AT MAIN RESIDENTIAL LOBBY ENTRANCE - NIGHTFALL METALLIC PRIVACY LANDSCAPE PLANTER SCREEN AT SECOND/ FIFTH FLOOR DECK PRIVACY LANDSCAPE PLANTER SCREEN AT SECOND/ FIFTH FLOOR DECK SURFACE MOUNT LIGHT FIXTURE - BUILDING PERIMETER ARCHITECTURE CANOPY - NIGHTFALL METALLIC MOTORIZED SECURITY GRILLE AT PARKING GARAGE ENTRANCE - COOKSON ESG10 SERIES SEATING IMAGERY - 6TH AVENUE & S. B STREET SEATING IMAGERY - 6TH AVENUE & S. B STREET SEATING IMAGERY - 6TH AVENUE & S. B STREET MECHANICAL SCREEN AT ROOF EQUIPMENT WELLE WCR02-SF SHORT-TERM BIKE RACK PROJECT NO: DATE DESCRIPTION Q:\2022 Jobs\225684 - Nazareth Vista Mixed-Use\01-Planning App\2025-MMDD 3RD PLANNING SUBMITTAL\225684-A319.dwg - Dec 22, 2025, 1:05pm - josephinek The "user(s)" in possession of this documentation acknowledge(s) that ARC TEC's and ARC TEC consultants' drawings, specifications, reports, electronic data and other documentation are instruments of service. ARC TEC and ARC TEC consultants shall be deemed the author and owner of such documentation. The "user(s)" in possession of this documentation shall not use or authorize any other person to use ARC TEC's or ARC TEC consultants' instruments of service. Reuse without ARC TEC's written authorization will be at the user(s) sole risk and without liability to ARC TEC and ARC TEC's consultants. The user(s) possessing this documentation shall indemnify and hold harmless ARC TEC and ARC TEC's consultants and agents and employees from and against all claims, damages losses and expenses, including but not limited to attorneys' fees, arising out of unauthorized reuse of ARC TEC o r ARC TEC' s c o n s u l t a n t s i n s tr ume n t s o f s e r v i c e . Written dimensions on this drawing shall have precedence over any scaled dimension. DO NOT SCALE THIS DRAWING for accurate dimensions and notify ARC TEC of any discrepancies. © Copyright ARC TEC, Inc. 2021 In Association with: A R C T E C ARCHITECTURAL TECHNOLOGIES www.arctecinc.com Arizona 2960 East Northern Avenue, Building C Phoenix, AZ 85028 602.953.2355 California 1731 Technology Drive, Suite 750 San Jose, CA 95110 408.496.0676 225684 A Planning Application for:
NAZARETH VISTA
616 S. B STREET
SAN MATEO, CA 94401 05.10.2022 1ST PLANNING SUBMITTAL 10.21.2022 2ND PLANNING SUBMITTAL 01.20.2023 3RD PLANNING SUBMITTAL 04.07.2023 4TH PLANNING SUBMITTAL 05.25.2023 5TH PLANNING SUBMITTAL 408 of 786 +14'-0" A.F.F.
LEVEL 2
+0'-0" A.F.F.
LEVEL 1
+84'-10" A.F.F.
PLATE
+24'-0" A.F.F.
LEVEL 3
+34'-0" A.F.F.
LEVEL 4
+44'-2" A.F.F.
LEVEL 5
+54'-4" A.F.F.
LEVEL 6
+64'-6" A.F.F.
LEVEL 7
+74'-8" A.F.F.
LEVEL 8
FACADE SETBACK FROM PROPERTY LINE
BETWEEN 20FT TO LESS THAN 25 FT
FACADE AREA 'A' 43'-0"
R-2
OCCUPANCY
UNPROTECTED
77 S.F.
R-2
OCCUPANCY
UNPROTECTED
77 S.F.
R-2
OCCUPANCY
UNPROTECTED
77 S.F.
R-2
OCCUPANCY
UNPROTECTED
52 S.F.
R-2
OCCUPANCY
UNPROTECTED
52 S.F.
R-2
OCCUPANCY
UNPROTECTED
52 S.F.
R-2
OCCUPANCY
UNPROTECTED
77 S.F.
R-2
OCCUPANCY
UNPROTECTED
77 S.F.
R-2
OCCUPANCY
UNPROTECTED
77 S.F.
R-2
OCCUPANCY
UNPROTECTED
77 S.F.
R-2
OCCUPANCY
UNPROTECTED
77 S.F.
R-2
OCCUPANCY
UNPROTECTED
77 S.F.
R-2
OCCUPANCY
UNPROTECTED
77 S.F.
R-2
OCCUPANCY
UNPROTECTED
77 S.F.
R-2
OCCUPANCY
UNPROTECTED
77 S.F.
R-2
OCCUPANCY
UNPROTECTED
77 S.F.
R-2
OCCUPANCY
UNPROTECTED
77 S.F.
R-2
OCCUPANCY
UNPROTECTED
77 S.F.
R-2
OCCUPANCY
UNPROTECTED
77 S.F.
R-2
OCCUPANCY
UNPROTECTED
77 S.F.
R-2
OCCUPANCY
UNPROTECTED
77 S.F.
R-2
OCCUPANCY
UNPROTECTED
52 S.F.
R-2
OCCUPANCY
UNPROTECTED
52 S.F.
R-2
OCCUPANCY
UNPROTECTED
52 S.F.
R-2
OCCUPANCY
UNPROTECTED
52 S.F.
R-2
OCCUPANCY
UNPROTECTED
52 S.F.
R-2
OCCUPANCY
UNPROTECTED
52 S.F.
R-2
OCCUPANCY
UNPROTECTED
77 S.F.
R-2
OCCUPANCY
UNPROTECTED
77 S.F.
R-2
OCCUPANCY
UNPROTECTED
52 S.F.
R-2
OCCUPANCY
UNPROTECTED
65 S.F.
R-2
OCCUPANCY
UNPROTECTED
52 S.F.
R-2
OCCUPANCY
UNPROTECTED
52 S.F.
R-2
OCCUPANCY
UNPROTECTED
77 S.F.
R-2
OCCUPANCY
UNPROTECTED
77 S.F.
R-2
OCCUPANCY
UNPROTECTED
77 S.F.
R-2
OCCUPANCY
UNPROTECTED
77 S.F.
R-2
OCCUPANCY
UNPROTECTED
77 S.F.
R-2
OCCUPANCY
UNPROTECTED
65 S.F.
R-2
OCCUPANCY
UNPROTECTED
65 S.F.
R-2
OCCUPANCY
UNPROTECTED
65 S.F.
R-2
OCCUPANCY
UNPROTECTED
65 S.F.
R-2
OCCUPANCY
UNPROTECTED
65 S.F.
R-2
OCCUPANCY
UNPROTECTED
65 S.F.
R-2
OCCUPANCY
UNPROTECTED
65 S.F.
R-2
OCCUPANCY
UNPROTECTED
65 S.F.
R-2
OCCUPANCY
UNPROTECTED
65 S.F.
R-2
OCCUPANCY
UNPROTECTED
65 S.F.
R-2
OCCUPANCY
UNPROTECTED
65 S.F.
R-2
OCCUPANCY
UNPROTECTED
65 S.F.
R-2
OCCUPANCY
UNPROTECTED
65 S.F.
R-2
OCCUPANCY
UNPROTECTED
65 S.F.
R-2
OCCUPANCY
UNPROTECTED
26 S.F.
R-2
OCCUPANCY
UNPROTECTED
26 S.F.
R-2
OCCUPANCY
UNPROTECTED
26 S.F.
R-2
OCCUPANCY
UNPROTECTED
26 S.F.
R-2
OCCUPANCY
UNPROTECTED
26 S.F.
R-2
OCCUPANCY
UNPROTECTED
26 S.F.
R-2
OCCUPANCY
UNPROTECTED
26 S.F.
R-2
OCCUPANCY
UNPROTECTED
26 S.F.
R-2
OCCUPANCY
UNPROTECTED
26 S.F.
R-2
OCCUPANCY
UNPROTECTED
26 S.F.
FACADE SETBACK FROM PROPERTY LINE
BETWEEN 25FT TO LESS THAN 30FT
FACADE AREA 'B'
13'-2"
FACADE SETBACK FROM PROPERTY LINE
BETWEEN 25FT TO LESS THAN 30FT
FACADE AREA 'E'
48'-3"
FACADE SETBACK FROM PROPERTY LINE
BETWEEN 25FT TO LESS THAN 30FT
FACADE AREA 'C'
13'-2"
FACADE SETBACK FROM PROPERTY LINE
BETWEEN 25FT TO LESS THAN 30FT
FACADE AREA 'D'
13'-2"
FACADE SETBACK FROM PROPERTY LINE
BETWEEN 20FT TO LESS THAN 25 FT
FACADE AREA 'F'
52'-0"
R-2
OCCUPANCY
UNPROTECTED
25 S.F.
R-2
OCCUPANCY
UNPROTECTED
25 S.F.
R-2
OCCUPANCY
UNPROTECTED
25 S.F.
R-2
OCCUPANCY
UNPROTECTED
25 S.F.
R-2
OCCUPANCY
UNPROTECTED
25 S.F.
R-2
OCCUPANCY
UNPROTECTED
38 S.F.
R-2
OCCUPANCY
UNPROTECTED
38 S.F.
R-2
OCCUPANCY
UNPROTECTED
38 S.F.
R-2
OCCUPANCY
UNPROTECTED
38 S.F.
FACADE SETBACK FROM PROPERTY LINE
30 FT OR GREATER
FACADE AREA 'G' 6'-0"
FACADE SETBACK FROM PROPERTY LINE
30 FT OR GREATER
FACADE AREA 'H' 12'-7"
FACADE SETBACK FROM PROPERTY LINE
30 FT OR GREATER
FACADE AREA 'J' 12'-7"
FACADE SETBACK FROM PROPERTY LINE
30 FT OR GREATER
FACADE AREA 'K' 12'-7"
FACADE SETBACK FROM PROPERTY LINE
30 FT OR GREATER
FACADE AREA 'L' 5'-3"
PROJECT NO:
DATE DESCRIPTION
Q:\2022 Jobs\225684 - Nazareth Vista Mixed-Use\01-Planning App\2025-MMDD 3RD PLANNING SUBMITTAL\225684-A320.dwg - Dec 22, 2025, 1:28pm - josephinek The "user(s)" in possession of this documentation acknowledge(s) thatARC TEC's and ARC TEC consultants' drawings, specifications, reports, electronic data and other documentation are instruments of service. ARC TEC and ARC TEC consultants shall be deemed the author and owner of suchdocumentation. The "user(s)" in possession of this documentation shall not use or authorize any other person to use ARC TEC's or ARC TEC consultants' instruments of service. Reuse without ARC TEC's written authorization will be at the user(s) sole risk and without liability to ARC TEC and ARC TEC's consultants. The user(s) possessing this documentation shall indemnify and hold harmless ARC TEC and ARC TEC's consultants and agents and employees from and against all claims, damages losses and expenses, including but not limited to attorneys' fees, arising out of unauthorized reuse of ARC TEC o r ARC TEC' s c o n su lt a n t s i n s tr ume n t s o f s e r v i c e . Written dimensions on this drawing shall have precedence over any scaleddimension. DO NOT SCALE THIS DRAWING for accurate dimensions and notify ARC TEC of any discrepancies.
© Copyright ARC TEC, Inc. 2021
In Association with:
A R C T E C
ARCHITECTURAL TECHNOLOGIES
www.arctecinc.com
Arizona
2960 East Northern Avenue, Building C
Phoenix, AZ 85028 602.953.2355
California
1731 Technology Drive, Suite 750
San Jose, CA 95110 408.496.0676
225684.11
A Planning Applicationt For:
NAZARETH VISTA
606 - 616 SOUTH B STREET
SAN MATEO, CA 94401
03.26.2025 SB330 APPLICATION04.30.2025 1ST PLANNING SUBMITTAL08.11.2025 2ND PLANNING SUBMITTAL12.16.2025 3RD PLANNING SUBMITTAL PA-2024-039
12 A3.20
OPENING FIRE SEPARATION
DISTANCE
SCALE:
EXTERIOR ELEVATION | REAR
3/32" = 1'-0" 1
0 5 10 20 30 50 70
WALL OPENING TABULATION CALCULATIONS - REAR ELEVATION (PER CBC 2022 TABLE 705.8 MAXIMUM AREA OF EXTERIOR WALL
OPENINGS BASED ON FIRE SEPARATION DISTANCE AND DEGREE OF OPENING PROTECTION
TOTAL STORY ALLOWABLE OPENING AREA OPENING AREA
AREA AREA % ALLOWED PROVIDED
FACADE AREA 'A'
4TH LEVEL 43'-0" * 10'-2" = 437.89 SF NO LIMIT NO LIMIT 154 SF 5TH LEVEL 43'-0" * 10'-2" = 437.89 SF NO LIMIT NO LIMIT 77 SF6TH LEVEL 43'-0" * 10'-2" = 437.89 SF NO LIMIT NO LIMIT 77 SF7TH LEVEL 43'-0" * 10'-2" = 437.89 SF NO LIMIT NO LIMIT 77 SF8TH LEVEL 43'-0" * 10'-2" = 437.89 SF NO LIMIT NO LIMIT 25 SF
TOTAL STORY ALLOWABLE OPENING AREA OPENING AREA
AREA AREA % ALLOWED PROVIDED
FACADE AREA 'B'
4TH LEVEL 13'-2" * 10'-2" = 134.22 SF NO LIMIT NO LIMIT 52 SF 5TH LEVEL 13'-2" * 10'-2" = 134.22 SF NO LIMIT NO LIMIT 52 SF6TH LEVEL 13'-2" * 10'-2" = 134.22 SF NO LIMIT NO LIMIT 52 SF7TH LEVEL 13'-2" * 10'-2" = 134.22 SF NO LIMIT NO LIMIT 52 SF8TH LEVEL 13'-2" * 10'-2" = 134.22 SF NO LIMIT NO LIMIT 25 SF
TOTAL STORY ALLOWABLE OPENING AREA OPENING AREA
AREA AREA % ALLOWED PROVIDED
FACADE AREA 'C'
4TH LEVEL 13'-2" * 10'-2" = 134.22 SF NO LIMIT NO LIMIT 52 SF 5TH LEVEL 13'-2" * 10'-2" = 134.22 SF NO LIMIT NO LIMIT 52 SF6TH LEVEL 13'-2" * 10'-2" = 134.22 SF NO LIMIT NO LIMIT 52 SF7TH LEVEL 13'-2" * 10'-2" = 134.22 SF NO LIMIT NO LIMIT 52 SF8TH LEVEL 13'-2" * 10'-2" = 134.22 SF NO LIMIT NO LIMIT 25 SF
TOTAL STORY ALLOWABLE OPENING AREA OPENING AREA
AREA AREA % ALLOWED PROVIDED
FACADE AREA 'D'
4TH LEVEL 13'-2" * 10'-2" = 134.22 SF NO LIMIT NO LIMIT 52 SF 5TH LEVEL 13'-2" * 10'-2" = 134.22 SF NO LIMIT NO LIMIT 52 SF6TH LEVEL 13'-2" * 10'-2" = 134.22 SF NO LIMIT NO LIMIT 52 SF7TH LEVEL 13'-2" * 10'-2" = 134.22 SF NO LIMIT NO LIMIT 52 SF8TH LEVEL 13'-2" * 10'-2" = 134.22 SF NO LIMIT NO LIMIT 25 SF
TOTAL STORY ALLOWABLE OPENING AREA OPENING AREA
AREA AREA % ALLOWED PROVIDED
FACADE AREA 'E'
4TH LEVEL 48'-3" * 10'-2" = 490.71 SF NO LIMIT NO LIMIT 231 SF 5TH LEVEL 48'-3" * 10'-2" = 490.71 SF NO LIMIT NO LIMIT 231 SF6TH LEVEL 48'-3" * 10'-2" = 490.71 SF NO LIMIT NO LIMIT 231 SF7TH LEVEL 48'-3" * 10'-2" = 490.71 SF NO LIMIT NO LIMIT 231 SF8TH LEVEL 48'-3" * 10'-2" = 490.71 SF NO LIMIT NO LIMIT 114 SF
TOTAL STORY ALLOWABLE OPENING AREA OPENING AREA
AREA AREA % ALLOWED PROVIDED
FACADE AREA 'F'
4TH LEVEL 52'-0" * 10'-2" = 528.66 SF NO LIMIT NO LIMIT 154 SF 5TH LEVEL 52'-0" * 10'-2" = 528.66 SF NO LIMIT NO LIMIT 154 SF6TH LEVEL 52'-0" * 10'-2" = 528.66 SF NO LIMIT NO LIMIT 154 SF7TH LEVEL 52'-0" * 10'-2" = 528.66 SF NO LIMIT NO LIMIT 154 SF8TH LEVEL 52'-0" * 10'-2" = 528.66 SF NO LIMIT NO LIMIT 63 SF
TOTAL STORY ALLOWABLE OPENING AREA OPENING AREA
AREA AREA % ALLOWED PROVIDED
FACADE AREA 'G'
4TH LEVEL 6'-0" * 10'-2" = 60.93 SF NO LIMIT NO LIMIT 26 SF 5TH LEVEL 6'-0" * 10'-2" = 60.93 SF NO LIMIT NO LIMIT 26 SF6TH LEVEL 6'-0" * 10'-2" = 60.93 SF NO LIMIT NO LIMIT 26 SF7TH LEVEL 6'-0" * 10'-2" = 60.93 SF NO LIMIT NO LIMIT 26 SF8TH LEVEL 6'-0" * 10'-2" = 60.93 SF NO LIMIT NO LIMIT 26 SF
TOTAL STORY ALLOWABLE OPENING AREA OPENING AREA
AREA AREA % ALLOWED PROVIDED
FACADE AREA 'H'
4TH LEVEL 12'-7" * 10'-2" = 128.28 SF NO LIMIT NO LIMIT 65 SF 5TH LEVEL 12'-7" * 10'-2" = 128.28 SF NO LIMIT NO LIMIT 65 SF6TH LEVEL 12'-7" * 10'-2" = 128.28 SF NO LIMIT NO LIMIT 65 SF7TH LEVEL 12'-7" * 10'-2" = 128.28 SF NO LIMIT NO LIMIT 65 SF8TH LEVEL 12'-7" * 10'-2" = 128.28 SF NO LIMIT NO LIMIT 65 SF
TOTAL STORY ALLOWABLE OPENING AREA OPENING AREA
AREA AREA % ALLOWED PROVIDED
FACADE AREA 'J'
4TH LEVEL 12'-7" * 10'-2" = 128.28 SF NO LIMIT NO LIMIT 65 SF 5TH LEVEL 12'-7" * 10'-2" = 128.28 SF NO LIMIT NO LIMIT 65 SF6TH LEVEL 12'-7" * 10'-2" = 128.28 SF NO LIMIT NO LIMIT 65 SF7TH LEVEL 12'-7" * 10'-2" = 128.28 SF NO LIMIT NO LIMIT 65 SF8TH LEVEL 12'-7" * 10'-2" = 128.28 SF NO LIMIT NO LIMIT 65 SF
TOTAL STORY ALLOWABLE OPENING AREA OPENING AREA
AREA AREA % ALLOWED PROVIDED
FACADE AREA 'K'
4TH LEVEL 12'-7" * 10'-2" = 128.28 SF NO LIMIT NO LIMIT 65 SF 5TH LEVEL 12'-7" * 10'-2" = 128.28 SF NO LIMIT NO LIMIT 65 SF6TH LEVEL 12'-7" * 10'-2" = 128.28 SF NO LIMIT NO LIMIT 65 SF7TH LEVEL 12'-7" * 10'-2" = 128.28 SF NO LIMIT NO LIMIT 65 SF8TH LEVEL 12'-7" * 10'-2" = 128.28 SF NO LIMIT NO LIMIT 65 SF
TOTAL STORY ALLOWABLE OPENING AREA OPENING AREA
AREA AREA % ALLOWED PROVIDED
FACADE AREA 'L'
4TH LEVEL 5'-3" * 10'-2" = 53.36 SF NO LIMIT NO LIMIT 26 SF 5TH LEVEL 5'-3" * 10'-2" = 53.36 SF NO LIMIT NO LIMIT 26 SF6TH LEVEL 5'-3" * 10'-2" = 53.36 SF NO LIMIT NO LIMIT 26 SF7TH LEVEL 5'-3" * 10'-2" = 53.36 SF NO LIMIT NO LIMIT 26 SF8TH LEVEL 5'-3" * 10'-2" = 53.36 SF NO LIMIT NO LIMIT 26 SF 2 2
409 of 786
+14'-0" A.F.F.
LEVEL 2
+0'-0" A.F.F.
LEVEL 1
+84'-10" A.F.F.
PLATE
+24'-0" A.F.F.
LEVEL 3
+34'-0" A.F.F.
LEVEL 4
+44'-2" A.F.F.
LEVEL 5
+54'-4" A.F.F.
LEVEL 6
+64'-6" A.F.F.
LEVEL 7
+74'-8" A.F.F.
LEVEL 8
A B B.1 B.3 C C.1 D D.1 E E.1 F F.1 G G.9 H H.8 J K
RETAIL
##
PARKING GARAGE
##
PARKING GARAGE
##
RESIDENTIAL
UNIT
##
RESIDENTIAL
UNIT
##
RESIDENTIAL
UNIT
##
RESIDENTIAL
UNIT
##
RESIDENTIAL
UNIT
##
RESIDENTIAL
UNIT
##
RESIDENTIAL
UNIT
##
RESIDENTIAL
UNIT
##
RESIDENTIAL
UNIT
##
RESIDENTIAL
UNIT
##
RESIDENTIAL
UNIT
##
RESIDENTIAL
UNIT
##
RESIDENTIAL
UNIT
##
RESIDENTIAL
UNIT
##
RESIDENTIAL
UNIT
##
RESIDENTIAL
UNIT
##
RESIDENTIAL
UNIT
##
RESIDENTIAL
UNIT
##
RESIDENTIAL
UNIT
##
RESIDENTIAL
UNIT
##
RESIDENTIAL
UNIT
##
RESIDENTIAL
UNIT
##
RESIDENTIAL
UNIT
##
RESIDENTIAL
UNIT
##
RESIDENTIAL
UNIT
##
RESIDENTIAL
UNIT
##
RESIDENTIAL
UNIT
##
RESIDENTIAL
UNIT
##
RESIDENTIAL
UNIT
##
RESIDENTIAL
UNIT
##
RESIDENTIAL
UNIT
##
RESIDENTIAL
UNIT
##
RESIDENTIAL
UNIT
##
RESIDENTIAL
UNIT
##
RESIDENTIAL
UNIT
##
RESIDENTIAL
UNIT
##
RESIDENTIAL
UNIT
##
RESIDENTIAL
UNIT
##
RESIDENTIAL
UNIT
##
RESIDENTIAL
UNIT
##
RESIDENTIAL
UNIT
##
RESIDENTIAL
UNIT
##
RESIDENTIAL
UNIT
##
RESIDENTIAL
UNIT
##
RESIDENTIAL
UNIT
##
RESIDENTIAL
UNIT
##
RESIDENTIAL
UNIT
##
RESIDENTIAL
UNIT
##
MECH
ROOF
##
RESIDENTIAL
FITNESS CENTER
##
84'-10" T.O. PLATE HEIGHT MEASURED FROM LOWEST GRADE POINT
AT SIDEWALK GRADE
14'-0" 10'-0" 10'-0" 10'-2" 10'-2" 10'-2" 10'-2" 10'-2" 8'-8"
TYP. CEILING
HEIGHT
8'-8"
TYP. CEILING
HEIGHT
8'-8"
TYP. CEILING
HEIGHT
8'-8"
TYP. CEILING
HEIGHT
8'-8"
TYP. CEILING
HEIGHT
6 TYP.
1 TYP.
8 1
4 TYP.
7 7
18 19
16 TYP.
11 TYP.
20 15
17171717
13 TYP.
151515
1 TYP.
87 2
475
TYP.
5 RESIDENTIAL
UNIT
##
1 2 2.2 2.5 2.7 3 4 4.5
RESIDENTIAL
FITNESS CENTER
##
RESIDENTIAL
LOBBY
##
MECH
ROOF
##
PARKING GARAGE
ACCESS RAMP
##
RESIDENTIAL
UNIT
##
RESIDENTIAL
UNIT
##
RESIDENTIAL
UNIT
##
RESIDENTIAL
UNIT
##
STAIR #01
##
LARGETRASH
##
LARGETRASH
##
LARGETRASH
##
LARGETRASH
##
LARGETRASH
##
ELEVATOR
LOBBY
##
ELEVATOR
LOBBY
##
ELEVATOR
LOBBY
##
ELEVATOR
LOBBY
##
ELEVATOR
LOBBY
##
RESIDENTIAL
UNIT
##
RESIDENTIAL
UNIT
##
RESIDENTIAL
UNIT
##
RESIDENTIAL
UNIT
##
RESIDENTIAL
UNIT
##
PARKING GARAGE
##
PARKING GARAGE
##
SHARED RESIDENTIAL
OPEN AREA
##
84'-10" T.O. PLATE HEIGHT MEASURED FROM LOWEST GRADE POINT
AT SIDEWALK GRADE
PARKING GARAGE
ACCESS RAMP
##
PARKING GARAGE
ACCESS RAMP
##
EXISTING
2-STORY
BUILDING
14'-0" 10'-0" 10'-0" 10'-2" 10'-2" 10'-2" 10'-2" 10'-2" 8'-8"
TYP. CEILING
HEIGHT
8'-8"
TYP. CEILING
HEIGHT
8'-8"
TYP. CEILING
HEIGHT
8'-8"
TYP. CEILING
HEIGHT
8'-8"
TYP. CEILING
HEIGHT
+14'-0" A.F.F.
LEVEL 2
+0'-0" A.F.F.
LEVEL 1
+84'-10" A.F.F.
PLATE
+24'-0" A.F.F.
LEVEL 3
+34'-0" A.F.F.
LEVEL 4
+44'-2" A.F.F.
LEVEL 5
+54'-4" A.F.F.
LEVEL 6
+64'-6" A.F.F.
LEVEL 7
+74'-8" A.F.F.
LEVEL 8
8 7
19 6
TYP.
1 TYP.
81 4
TYP.
151515
15 16
TYP.
171717
17 7
7 11
TYP. 3
9 20
18 6
5 TYP.
2 PROJECT NO:
DATE DESCRIPTION
Q:\2022 Jobs\225684 - Nazareth Vista Mixed-Use\01-Planning App\2025-MMDD 3RD PLANNING SUBMITTAL\225684-A411.dwg - Dec 22, 2025, 1:29pm - josephinek The "user(s)" in possession of this documentation acknowledge(s) thatARC TEC's and ARC TEC consultants' drawings, specifications, reports, electronic data and other documentation are instruments of service. ARC TEC and ARC TEC consultants shall be deemed the author and owner of suchdocumentation. The "user(s)" in possession of this documentation shall not use or authorize any other person to use ARC TEC's or ARC TEC consultants' instruments of service. Reuse without ARC TEC's written authorization will be at the user(s) sole risk and without liability to ARC TEC and ARC TEC's consultants. The user(s) possessing this documentation shall indemnify and hold harmless ARC TEC and ARC TEC's consultants and agents and employees from and against all claims, damages losses and expenses, including but not limited to attorneys' fees, arising out of unauthorized reuse of ARC TEC o r ARC TEC' s c o n su lt a n t s i n s tr ume n t s o f s e r v i c e . Written dimensions on this drawing shall have precedence over any scaleddimension. DO NOT SCALE THIS DRAWING for accurate dimensions and notify ARC TEC of any discrepancies.
© Copyright ARC TEC, Inc. 2021
In Association with:
A R C T E C
ARCHITECTURAL TECHNOLOGIES
www.arctecinc.com
Arizona
2960 East Northern Avenue, Building C
Phoenix, AZ 85028 602.953.2355
California
1731 Technology Drive, Suite 750
San Jose, CA 95110 408.496.0676
225684.11
A Planning Applicationt For:
NAZARETH VISTA
606 - 616 SOUTH B STREET
SAN MATEO, CA 94401
03.26.2025 SB330 APPLICATION04.30.2025 1ST PLANNING SUBMITTAL08.11.2025 2ND PLANNING SUBMITTAL12.16.2025 3RD PLANNING SUBMITTAL PA-2024-039
12 A4.11
BUILDING SECTIONS
SCALE:
BUILDING SECTION
3/32" = 1'-0" 1
0 5 10 20 30 50 70
SCALE:
BUILDING SECTION
3/32" = 1'-0" 2
0 5 10 20 30 50 70
1 EXTERIOR GLAZING SYSTEM WITH ANODIZED ALUMINUM FRAMES
KEYNOTES
2 STAIR BEYOND3 TWO-STORY ADJACENT BUILDING4 RESIDENTIAL BALCONY6 42" H. BALCONY RAILING SYSTEM7 ALUMINUM COMPOSITE CANOPY SYSTEM8 EXISTING PROPERTY LINE9 SHARED RESIDENTIAL BALCONY 10 NOT USED
5 EXTERIOR WALL SYSTEM - REFER TO EXTERIOR ELEVATIONS FOR MATERIAL SPECIFICATIONS REINFORCED CONCRETE COLUMN WITH 34 11 " CHAMFERED EDGES 12 NOT USED13 1HR FIRE-RATED DEMISING WALL BETWEEN DWELLING UNITS1415161718 6 FT HIGH MECHANICAL EQUIPMENT SCREEN
WOOD JOIST RATED FLOOR/ CEILING ASSEMBLY
CONCRETE BEAMCONCRETE SLAB
19 SINGLE-PLY ROOFING SYSTEM OVER RIGID INSULATION
ALUM./ GLASS STOREFRONT ENTRANCE DOOR
20 3-HOUR HORIZONTAL FIRE RATING AT THE PODIUM
1 1
1 410 of 786
2'-8" 9'-11"X 7'-8" (H) 2'-8" 15'-3"
16'-8" 5'-7" 4'-2" 2'-0" 3'-0" 6'-7"
6'-10" 2'-8" 3'-10" 7'-0" 4'-11" 3'-5" LIVING / SLEEPING BATHEWH KITCHEN WIC W/D CL DINING 3'-1" 9'-11"X 7'-8" (H) 2'-6" 15'-5" 6'-1" 3'-0" 12'-1"
5" 13'-6"
3'-10" 3'-4" 6'-7"
6'-10" 2'-0" 4'-2"5'-1"
19'-7"
3'-8" 9'-11"X 7'-8" (H) 6'-1" 2'-2" 6'-4" 7'-0" LIVING / SLEEPING BATH W/D CL WIC EWH KITCHEN DINING 3'-5" 8'-4" X 7'-8" (H) 3'-10" 15'-6" LIVING / SLEEPING BATH W/D CL CL EWH KITCHEN DINING PRIVATE BALCONY 13'-5" 2'-0"
2'-8" 3'-10"
6'-10" 6'-7"
20'-1"
33'-7"
3'-4" 5'-2" 3'-0" 2'-2" 7'-0" 6'-4" 6'-7" LIVING / SLEEPING BATH W/D CL EWH KITCHENDINING 2'-0" 9'-11" X 7'-8" (H) 2'-0" 13'-10" 13'-7" 2'-2" 5'-8" 6'-0" 5'-2" 6'-7"
6'-10"
2'-8" 3'-10"
3'-4" 3'-0"2'-0"5'-7"
30'-10" LIVING / SLEEPING BATH W/D CL EWH KITCHEN DINING 2'-10" 9'-11" X 7'-8" (H) 2'-10" 15'-6" 17'-4" 2'-0"6'-7" 2'-2"
13'-9" 5'-2" 6'-7"
6'-10"
2'-8" 3'-10"
13'-6"
30'-10" 7'-0" LIVING / SLEEPING BATH W/D CL EWH KITCHEN DINING PRIVATE BALCONY 3'-2" 6'-8" X 7'-8" (H)
9'-10" 2'-2" 9'-11" X 7'-8" (H) 3'-6"
13'-10" 15'-7"2'-0" 6'-10" 6'-7"
3'-10" 3'-4" 3'-0" 5'-2" 8'-8" 13'-11"
31'-7"
12'-10" 4'-11" 3'-5" X 7'-8" (H) 9'-7" 2'-2" 3'-1" 6'-8" X 7'-8" (H) 5'-9" 15'-6" 5" 22'-7" 13'-0"
3'-4" 3'-0" 2'-2" 6'-4" 7'-0"
5'-7" 6'-7" 6'-7"6'-10" 2'-8" 3'-10" LIVING / SLEEPING BATH W/D WIC EWH KITCHEN DINING PROJECT NO: DATE DESCRIPTION Q:\2022 Jobs\225684 - Nazareth Vista Mixed-Use\01-Planning App\2025-MMDD 3RD PLANNING SUBMITTAL\225684-A511.dwg - Dec 22, 2025, 1:01pm - josephinek The "user(s)" in possession of this documentation acknowledge(s) that ARC TEC's and ARC TEC consultants' drawings, specifications, reports, electronic data and other documentation are instruments of service. ARC TECand ARC TEC consultants shall be deemed the author and owner of suchdocumentation. The "user(s)" in possession of this documentation shall not use or authorize any other person to use ARC TEC's or ARC TEC consultants' instruments of service. Reuse without ARC TEC's written authorization will beat the user(s) sole risk and without liability to ARC TEC and ARC TEC's consultants. The user(s) possessing this documentation shall indemnify and hold harmless ARC TEC and ARC TEC's consultants and agents and employees from and against all claims, damages losses and expenses, including but not limited to attorneys' fees, arising out of unauthorized reuse of ARC TEC o r ARC TEC' s c o n s u l t a n t s i n s tr ume n t s o f s e r v i c e . Written dimensions on this drawing shall have precedence over any scaled dimension. DO NOT SCALE THIS DRAWING for accurate dimensions and notify ARC TEC of any discrepancies. © Copyright ARC TEC, Inc. 2021 In Association with: A R C T E C ARCHITECTURAL TECHNOLOGIES www.arctecinc.com Arizona 2960 East Northern Avenue, Building C Phoenix, AZ 85028 602.953.2355 California 1731 Technology Drive, Suite 750 San Jose, CA 95110 408.496.0676 225684.11 A Planning Applicationt For:
NAZARETH VISTA
606 - 616 SOUTH B STREET
SAN MATEO, CA 94401 03.26.2025 SB330 APPLICATION 04.30.2025 1ST PLANNING SUBMITTAL 08.11.2025 2ND PLANNING SUBMITTAL 12.16.2025 3RD PLANNING SUBMITTAL PA-2024-039 12 A5.11 ENLARGED UNIT PLANS SCALE: ENLARGED PLAN STUDIO TYPE 'A1.0' 1/4" = 1'-0" 1 NET RENTABLE AREA: 541 S.F. SCALE: ENLARGED PLAN STUDIO TYPE 'A1.1' 1/4" = 1'-0" 2 NET RENTABLE AREA: 660 S.F. SCALE: ENLARGED PLAN STUDIO TYPE 'A1.2' 1/4" = 1'-0" 3 NET RENTABLE AREA: 653 S.F. SCALE: ENLARGED PLAN STUDIO TYPE 'A1.2A' 1/4" = 1'-0" 4 NET RENTABLE AREA: 563 S.F. SCALE: ENLARGED PLAN STUDIO TYPE 'A1.3' 1/4" = 1'-0" 5 NET RENTABLE AREA: 468 S.F. SCALE: ENLARGED PLAN STUDIO TYPE 'A1.4' 1/4" = 1'-0" 6 NET RENTABLE AREA: 517 S.F. SCALE: ENLARGED PLAN STUDIO TYPE 'A1.5' 1/4" = 1'-0" 7 NET RENTABLE AREA: 507 S.F. PROJECT DATA: Residential Units Unit Type Unit Area (S.F.) Balcony Area (S.F.) Unit Area w/Balcony (S.F.) # Unit Level 4 # Unit Level 5 # Unit Level 6 # Unit Level 7 # Unit Level 8 Total # Units Density Bonus Parking Req'd Short-Term Bike Pkg Req'd Long-Term Bike Pkg Req'd Total Unit Area Total Balcony Area Unit Mix A1.0 (Studio) 541 0 541 0 3 3 3 3 12 0.50 0.05 1.00 6,492 0 45% A1.1 (Studio) 660 0 660 0 1 1 1 0 3 0.50 0.05 1.00 1,980 0 A1.2 (Studio) 653 0 653 1 1 1 1 0 4 0.50 0.05 1.00 2,612 0 A1.2A (Studio) 553 92 645 0 1 1 1 0 3 0.50 0.05 1.00 1659 276 A1.3 (Studio) 468 0 468 3 3 3 3 0 12 0.50 0.05 1.00 5,616 0 A1.4 (Studio) 517 0 517 1 1 1 1 0 4 0.50 0.05 1.00 2,068 0 A1.5 (Studio) 507 152 659 0 0 0 0 1 1 0.50 0.05 1.00 507 152 A1.6 (Studio) 442 92 534 0 0 0 0 1 1 0.50 0.05 1.00 442 92 A1.6A (Studio) 481 96 577 0 0 0 0 1 1 0.50 0.05 1.00 481 96 A1.7 (Studio) 370 0 370 0 0 0 0 1 1 0.50 0.05 1.00 370 0 B1.0 (1BR/1BA Unit) 820 74 894 1 2 2 2 2 9 0.50 0.05 1.00 7,380 666 42% B1.1 (1BR/1BA Unit) 800 74 874 1 1 1 1 1 5 0.50 0.05 1.00 4,000 370 B1.2 (1BR/1BA Unit) 894 148 1,042 1 1 1 1 0 4 0.50 0.05 1.00 3,576 592 B1.3 (1BR/1BA Unit) 747 74 821 3 3 3 3 0 12 0.50 0.05 1.00 8964 888 B1.4 (1BR/1BA Unit) 832 88 920 1 1 1 1 0 4 0.50 0.05 1.00 3328 352 B1.5 (1BR/1BA Unit) 976 627 1603 0 0 0 0 1 1 0.50 0.05 1.00 976 627 B1.6 (1BR/1BA Unit) 622 195 817 0 0 0 0 3 3 0.50 0.05 1.00 1866 585 B1.7 (1BR/1BA Unit) 670 220 890 0 0 0 0 1 1 0.50 0.05 1.00 670 220 B1.8 (1BR/1BA Unit) 623 260 883 0 0 0 0 1 1 0.50 0.05 1.00 623 260 B1.9 (1BR/1BA Unit) 713 611 1324 0 0 0 0 1 1 0.50 0.05 1.00 713 611 C1.0 (2BR/2BA Unit) 1308 0 1,308 1 1 1 1 0 4 0.50 0.10 1.25 5,232 0 13% C1.1 (2BR/2BA Unit) 1,400 58 1,458 1 1 1 1 0 4 0.50 0.10 1.25 5,600 232 C1.2 (2BR/2BA Unit) 1,118 277 1,395 0 0 0 0 1 1 0.50 0.10 1.25 1,118 277 C1.3 (2BR/1BA Unit) 1,223 92 1,315 1 0 0 0 0 1 0.50 0.10 1.25 1223 92 C1.4 (2BR/2BA Unit) 1,240 74 1314 1 0 0 0 0 1 0.50 0.10 1.25 1240 74 Total # dwelling units 16 20 20 20 18 94 67,495 6,553 (1) BMR UNIT @ LEVEL 06 (1) BMR UNIT @ LEVEL 07 (1) BMR UNIT @ LEVEL 04 (1) BMR UNIT @ LEVEL 07 (1) BMR UNIT @ LEVEL 05 BMR UNIT BREAKDOWN # VLI (VERY LOW INCOME) UNITS UNIT TYPE STUDIO LOCATION LEVEL 04 1 # LI ( LOW INCOME) UNITS 0 # MOD ( MODERATE INCOME) UNITS
0 TAG A1.2 1BED/1BA B1.3 LEVEL 04 1 0 0 2BED/2BA C1.4 LEVEL 04 1 0 0 STUDIO A1.3 LEVEL 05 1 0 0 1BED/1BA B1.1 LEVEL 05 1 0 0 STUDIO A1.0 LEVEL 06 1 0 0 1BED/1BA B1.3 LEVEL 06 1 0 0 STUDIO A1.0 LEVEL 07 1 0 0 STUDIO A1.2 LEVEL 07 1 0 0 653 AREA (S.F.) 747 1,240 468 800 541 747 541 653 TOTAL BMR UNITS 10 0 0 TOTAL BMR UNITS 111111111 % BMR UNITS 10% 10% 10% 10% 10% 10% 10% 10% 10% 1BED/1BA B1.1 800 LEVEL 07 1 0 0 1 10% 411 of 786
LIVING / SLEEPING BATH W/D WIC EWH KITCHEN DINING PRIVATE BALCONY 15'-7" 3'-6" 9'-11" X 7'-8" (H) 15'-6" 2'-2" 6'-4" 7'-0" 5'-7" 2'-8" 6'-10" 6'-7" 3'-0" 5'-2"
3'-4"
32'-9" 3'-10" 2'-2" 6'-7" LIVING / SLEEPING BATH W/D CL EWH KITCHEN DINING PRIVATE BALCONY 2'-2" 9'-11" X 7'-8" (H) 2'-7" 14'-7" 13'-10" 2'-0"6'-7" 3'-10"
2'-8" 6'-7"
6'-10" 7'-0" 4'-2" 3'-5"
3'-4"
18'-11"
32'-9" BATH LIVING BEDRM 01 KITCHENPRIVATE BALCONY STUDY DINING W/D EWH CL ENTRANCE 2'-2" 8'-4" X 7'-8" (H) 2'-7" 13'-1" 29'-5" 12'-6" 5'-6" 6'-7"
5'-6" 6'-10" 6'-7" 3'-10" 2'-5" 6'-8" X 7'-8" (H) 2'-5" 11'-6" 14'-3" 3'-4" 3'-0" 25'-0"
2'-8" 2'-0" 6'-7" BATH LIVING BEDRM 01 KITCHEN PRIVATE BALCONY EWH CL CL W/D DINING ENTRANCE 2'-2" 8'-4" X 7'-8" (H) 2'-7" 13'-1" 29'-5" 1'-10" 6'-8" X 7'-8" (H) 3'-4" 11'-11"
12'-3"
2'-8" 2'-0" 3'-10" 6'-7" 6'-10" 2'-11" 7'-6" 12'-10" 5'-2" 18'-5" 3'-4" 3'-0"W/D BATH LIVING BEDRM 01 KITCHEN PRIVATE BALCONY EWH CL PRIVATE BALCONY DINING ENTRANCE 8'-7" 9'-11" X 7'-8" (H) 3'-5" 21'-11" 4'-4" 6'-8" X 7'-8" (H) 3'-8"
14'-8"
2'-5" 8'-4" X 7'-8" (H) 2'-10"
13'-7" 2'-2" 8'-4" X 7'-8" (H) 2'-7" 13'-1"
11'-2" 2'-0"
6'-10" 6'-7" 5'-7"
5'-2" 8'-0"
13'-2" 6'-7"2'-8" 16'-3" 15'-9" 6'-2" BATH LIVING BEDRM 01 KITCHENPRIVATE BALCONY EWH CL W/D DINING ENTRANCE STUDY 2'-2" 8'-4" X 7'-8" (H) 2'-7" 13'-1" 5'-7"
26'-6"
5'-6" 6'-10" 6'-7"
2'-8" 3'-10"2'-0"
3'-0"3'-4" 12'-6" 5" 5'-6"
1'-10" 25'-0"
11'-4" 2'-5" 6'-8" X 7'-8" (H) 2'-5" 11'-6" 6'-7" BATH LIVING BEDRM 01 KITCHEN PRIVATE BALCONY CL DINING ENTRANCE 1'-1" 8'-4" X 7'-8" (H) 3'-10" 13'-3" 10'-8" 2'-0" 6'-10"
6'-7" 4'-9"
13'-1" 3'-1" 9'-11" X 7'-8" (H) 3'-1" 16'-0"
30'-10" 13'-10" 5'-11"
1'-10"
13'-1" 19'-9" 10'-2"
19'-3" 6'-5" PROJECT NO: DATE DESCRIPTION
Q:\2022 Jobs\225684 - Nazareth Vista Mixed-Use\01-Planning App\2025-MMDD 3RD PLANNING SUBMITTAL\225684-A511.dwg - Dec 22, 2025, 1:01pm - josephinek The "user(s)" in possession of this documentation acknowledge(s) that ARC TEC's and ARC TEC consultants' drawings, specifications, reports, electronic data and other documentation are instruments of service. ARC TEC and ARC TEC consultants shall be deemed the author and owner of such documentation. The "user(s)" in possession of this documentation shall not use or authorize any other person to use ARC TEC's or ARC TEC consultants' instruments of service. Reuse without ARC TEC's written authorization will be at the user(s) sole risk and without liability to ARC TEC and ARC TEC's consultants. The user(s) possessing this documentation shall indemnify and hold harmless ARC TEC and ARC TEC's consultants and agents and employees from and against all claims, damages losses and expenses, including but not limited to attorneys' fees, arising out of unauthorized reuse of ARC TEC o r ARC TEC' s c o n s u l t a n t s i n s tr ume n t s o f s e r v i c e . Written dimensions on this drawing shall have precedence over any scaled dimension. DO NOT SCALE THIS DRAWING for accurate dimensions and notify ARC TEC of any discrepancies. © Copyright ARC TEC, Inc. 2021 In Association with: A R C T E C ARCHITECTURAL TECHNOLOGIES www.arctecinc.com Arizona 2960 East Northern Avenue, Building C Phoenix, AZ 85028 602.953.2355 California 1731 Technology Drive, Suite 750 San Jose, CA 95110 408.496.0676 225684.11 A Planning Applicationt For:
NAZARETH VISTA
606 - 616 SOUTH B STREET
SAN MATEO, CA 94401 03.26.2025 SB330 APPLICATION 04.30.2025 1ST PLANNING SUBMITTAL 08.11.2025 2ND PLANNING SUBMITTAL 12.16.2025 3RD PLANNING SUBMITTAL PA-2024-039 12 A5.12 ENLARGED UNIT PLANS PROJECT DATA: Residential Units Unit Type Unit Area (S.F.) Balcony Area (S.F.) Unit Area w/Balcony (S.F.) # Unit Level 4 # Unit Level 5 # Unit Level 6 # Unit Level 7 # Unit Level 8 Total # Units Density Bonus Parking Req'd Short-Term Bike Pkg Req'd Long-Term Bike Pkg Req'd Total Unit Area Total Balcony Area Unit Mix A1.0 (Studio) 541 0 541 0 3 3 3 3 12 0.50 0.05 1.00 6,492 0 45% A1.1 (Studio) 660 0 660 0 1 1 1 0 3 0.50 0.05 1.00 1,980 0 A1.2 (Studio) 653 0 653 1 1 1 1 0 4 0.50 0.05 1.00 2,612 0 A1.2A (Studio) 553 92 645 0 1 1 1 0 3 0.50 0.05 1.00 1659 276 A1.3 (Studio) 468 0 468 3 3 3 3 0 12 0.50 0.05 1.00 5,616 0 A1.4 (Studio) 517 0 517 1 1 1 1 0 4 0.50 0.05 1.00 2,068 0 A1.5 (Studio) 507 152 659 0 0 0 0 1 1 0.50 0.05 1.00 507 152 A1.6 (Studio) 442 92 534 0 0 0 0 1 1 0.50 0.05 1.00 442 92 A1.6A (Studio) 481 96 577 0 0 0 0 1 1 0.50 0.05 1.00 481 96 A1.7 (Studio) 370 0 370 0 0 0 0 1 1 0.50 0.05 1.00 370 0 B1.0 (1BR/1BA Unit) 820 74 894 1 2 2 2 2 9 0.50 0.05 1.00 7,380 666 42% B1.1 (1BR/1BA Unit) 800 74 874 1 1 1 1 1 5 0.50 0.05 1.00 4,000 370 B1.2 (1BR/1BA Unit) 894 148 1,042 1 1 1 1 0 4 0.50 0.05 1.00 3,576 592 B1.3 (1BR/1BA Unit) 747 74 821 3 3 3 3 0 12 0.50 0.05 1.00 8964 888 B1.4 (1BR/1BA Unit) 832 88 920 1 1 1 1 0 4 0.50 0.05 1.00 3328 352 B1.5 (1BR/1BA Unit) 976 627 1603 0 0 0 0 1 1 0.50 0.05 1.00 976 627 B1.6 (1BR/1BA Unit) 622 195 817 0 0 0 0 3 3 0.50 0.05 1.00 1866 585 B1.7 (1BR/1BA Unit) 670 220 890 0 0 0 0 1 1 0.50 0.05 1.00 670 220 B1.8 (1BR/1BA Unit) 623 260 883 0 0 0 0 1 1 0.50 0.05 1.00 623 260 B1.9 (1BR/1BA Unit) 713 611 1324 0 0 0 0 1 1 0.50 0.05 1.00 713 611 C1.0 (2BR/2BA Unit) 1308 0 1,308 1 1 1 1 0 4 0.50 0.10 1.25 5,232 0 13% C1.1 (2BR/2BA Unit) 1,400 58 1,458 1 1 1 1 0 4 0.50 0.10 1.25 5,600 232 C1.2 (2BR/2BA Unit) 1,118 277 1,395 0 0 0 0 1 1 0.50 0.10 1.25 1,118 277 C1.3 (2BR/1BA Unit) 1,223 92 1,315 1 0 0 0 0 1 0.50 0.10 1.25 1223 92 C1.4 (2BR/2BA Unit) 1,240 74 1314 1 0 0 0 0 1 0.50 0.10 1.25 1240 74 Total # dwelling units 16 20 20 20 18 94 67,495 6,553 NET RENTABLE AREA: 442 S.F. SCALE: ENLARGED PLAN STUDIO TYPE 'A1.6A' 1/4" = 1'-0" 2 NET RENTABLE AREA: 481 S.F. SCALE: ENLARGED PLAN STUDIO TYPE 'A1.6' 1/4" = 1'-0" 1 SCALE: ENLARGED PLAN 1BR/ 1BA TYPE 'B1.0' 1/4" = 1'-0" 3 NET RENTABLE AREA: 820 S.F. SCALE: ENLARGED PLAN 1BR/ 1BA TYPE 'B1.1' 1/4" = 1'-0" 4 NET RENTABLE AREA: 800 S.F. SCALE: ENLARGED PLAN 1BR/ 1BA TYPE 'B1.2' 1/4" = 1'-0" 5 NET RENTABLE AREA: 894 S.F. SCALE: ENLARGED PLAN 1BR/ 1BA TYPE 'B1.3' 1/4" = 1'-0" 6 NET RENTABLE AREA: 747 S.F. SCALE: ENLARGED PLAN 1BR/ 1BA TYPE 'B1.4' 1/4" = 1'-0" 7 NET RENTABLE AREA: 832 S.F. (1) BMR UNIT @ LEVEL 05 (1) BMR UNIT @ LEVEL 07 (1) BMR UNIT @ LEVEL 04 (1) BMR UNIT @ LEVEL 06 BMR UNIT BREAKDOWN # VLI (VERY LOW INCOME) UNITS UNIT TYPE STUDIO LOCATION LEVEL 04 1 # LI ( LOW INCOME) UNITS 0 # MOD ( MODERATE INCOME) UNITS 0 TAG A1.2 1BED/1BA B1.3 LEVEL 04 1 0 0 2BED/2BA C1.4 LEVEL 04 1 0 0 STUDIO A1.3 LEVEL 05 1 0 0 1BED/1BA B1.1 LEVEL 05 1 0 0 STUDIO A1.0 LEVEL 06 1 0 0 1BED/1BA B1.3 LEVEL 06 1 0 0 STUDIO A1.0 LEVEL 07 1 0 0 STUDIO A1.2 LEVEL 07 1 0 0 653 AREA (S.F.) 747 1,240 468 800 541 747 541 653 TOTAL BMR UNITS 10 0 0 TOTAL BMR UNITS 111111111 % BMR UNITS 10% 10% 10% 10% 10% 10% 10% 10% 10% 1BED/1BA B1.1 800 LEVEL 07 1 0 0 1 10% 412 of 786 UP BATH LIVING BEDRM 01 KITCHEN PRIVATE BALCONY EWH CL CL W/D DINING ENTRANCE 2'-3" 6'-8" X 7'-8" (H) 2'-7" 11'-6" 10'-4" 2'-0"6'-7"
6'-10" 6'-7"
2'-8" 3'-10" 5'-8" 5" 15'-2" 4'-5" 25'-8"
2'-0" 2'-1" 11'-1" 36'-9"
3'-0" 3'-4" 1'-7" 10'-0" X 7'-8" (H) 7'-3" 10'-0" X 7'-8" (H) 3'-2" 31'-10" 5'-2" 10'-0" X 7'-8" (H) 3'-2"
18'-3" LIVING BEDRM 01 KITCHEN PRIVATE BALCONY EWH CL W/D DINING BATH ENTRANCE 22'-8" 1'-2" 10'-0" X 7'-8" (H) 2'-7" 13'-8" 2'-7" 6'-8" X 7'-8" (H) 2'-3" 11'-6" 10'-4" 2'-0"6'-7"
2'-8" 3'-10"
6'-10" 12'-6" 6'-7" 5" 5'-8"
5'-4" 3'-0" 3'-4" 18'-7"
7'-9" 4'-11" LIVING BEDRM 01 KITCHEN PRIVATE BALCONY EWH CL W/D DINING BATH ENTRANCE 1'-8" 10'-0" X 7'-8" (H) 4'-2" 15'-8" 22'-8" 15'-1" 5" 5'-2" 6'-7" 20'-7"
7'-9" 4'-11" 6'-7"
2'-0" 2'-8" 3'-10"6'-10"
10'-4" 2'-5" 6'-8"X 7'-8" (H) 2'-5" 11'-6"
5'-4" 3'-0" 3'-4" LIVING BEDRM 01 KITCHEN PRIVATE BALCONY EWH WIC W/D DINING BATH ENTRANCE 2'-1" 10'-0" X 7'-8" (H) 8" 1'-6" 10'-0" X 7'-8" (H) 3'-4" 12'-8" 14'-8" 6'-9" 6'-7"
3'-0"4'-7" 7'-8"13'-1"
16'-6" 2'-8" 4'-0"
3'-0"3'-4" 10'-11"
16'-10" 5" 3'-8" LIVING BEDRM 01 KITCHEN ENTRANCE PRIVATE BALCONY EWH DINING CL CL BATH 2'-0" 1'-1" 10'-8" 5'-4"
11'-9"
14'-10" 13'-0" 3'-5" 16'-5"
6'-10" 6'-7"
3'-4" 3'-0"3'-10" 3'-1"
12'-4" 12'-0"
6'-8" X 7'-8" (H) 1'-3"
8'-11"
1'-4" 10'-0" X 7'-8" (H) 3'-1" 10'-0" X 7'-8" (H) 3'-2" 27'-5" 1'-5" 3'-5"X 7'-8" (H) 11'-6" 16'-5" PROJECT NO: DATE DESCRIPTION Q:\2022 Jobs\225684 - Nazareth Vista Mixed-Use\01-Planning App\2025-MMDD 3RD PLANNING SUBMITTAL\225684-A511.dwg - Dec 22, 2025, 1:01pm - josephinek The "user(s)" in possession of this documentation acknowledge(s) that ARC TEC's and ARC TEC consultants' drawings, specifications, reports, electronic data and other documentation are instruments of service. ARC TEC and ARC TEC consultants shall be deemed the author and owner of such documentation. The "user(s)" in possession of this documentation shall not use or authorize any other person to use ARC TEC's or ARC TEC consultants' instruments of service. Reuse without ARC TEC's written authorization will be at the user(s) sole risk and without liability to ARC TEC and ARC TEC's consultants. The user(s) possessing this documentation shall indemnify and hold harmless ARC TEC and ARC TEC's consultants and agents and employees from and against all claims, damages losses and expenses, including but not limited to attorneys' fees, arising out of unauthorized reuse of ARC TEC o r ARC TEC' s c o n s u l t a n t s i n s tr ume n t s o f s e r v i c e . Written dimensions on this drawing shall have precedence over any scaled dimension. DO NOT SCALE THIS DRAWING for accurate dimensions and notify ARC TEC of any discrepancies. © Copyright ARC TEC, Inc. 2021 In Association with: A R C T E C ARCHITECTURAL TECHNOLOGIES www.arctecinc.com Arizona 2960 East Northern Avenue, Building C Phoenix, AZ 85028 602.953.2355 California 1731 Technology Drive, Suite 750 San Jose, CA 95110 408.496.0676 225684.11 A Planning Applicationt For:
NAZARETH VISTA
606 - 616 SOUTH B STREET
SAN MATEO, CA 94401 03.26.2025 SB330 APPLICATION 04.30.2025 1ST PLANNING SUBMITTAL 08.11.2025 2ND PLANNING SUBMITTAL 12.16.2025 3RD PLANNING SUBMITTAL PA-2024-039 12 A5.13 ENLARGED UNIT PLANS SCALE: ENLARGED PLAN 1BR/ 1BA TYPE 'B1.5' 1/4" = 1'-0" 1 NET RENTABLE AREA: 976 S.F. SCALE: ENLARGED PLAN 1BR/ 1BA TYPE 'B1.6' 1/4" = 1'-0" 2 NET RENTABLE AREA: 622 S.F. SCALE: ENLARGED PLAN 1BR/ 1BA TYPE 'B1.7' 1/4" = 1'-0" 3 NET RENTABLE AREA: 670 S.F. SCALE: ENLARGED PLAN 1BR/ 1BA TYPE 'B1.8' 1/4" = 1'-0" 4 NET RENTABLE AREA: 623 S.F. SCALE: ENLARGED PLAN 1BR/ 1BA TYPE 'B1.9' 1/4" = 1'-0" 5 NET RENTABLE AREA: 713 S.F. PROJECT DATA: Residential Units Unit Type Unit Area (S.F.) Balcony Area (S.F.) Unit Area w/Balcony (S.F.) # Unit Level 4 # Unit Level 5 # Unit Level 6 # Unit Level 7 # Unit Level 8 Total # Units Density Bonus Parking Req'd Short-Term Bike Pkg Req'd Long-Term Bike Pkg Req'd Total Unit Area Total Balcony Area Unit Mix A1.0 (Studio) 541 0 541 0 3 3 3 3 12 0.50 0.05 1.00 6,492 0 45% A1.1 (Studio) 660 0 660 0 1 1 1 0 3 0.50 0.05 1.00 1,980 0 A1.2 (Studio) 653 0 653 1 1 1 1 0 4 0.50 0.05 1.00 2,612 0 A1.2A (Studio) 553 92 645 0 1 1 1 0 3 0.50 0.05 1.00 1659 276 A1.3 (Studio) 468 0 468 3 3 3 3 0 12 0.50 0.05 1.00 5,616 0 A1.4 (Studio) 517 0 517 1 1 1 1 0 4 0.50 0.05 1.00 2,068 0 A1.5 (Studio) 507 152 659 0 0 0 0 1 1 0.50 0.05 1.00 507 152 A1.6 (Studio) 442 92 534 0 0 0 0 1 1 0.50 0.05 1.00 442 92 A1.6A (Studio) 481 96 577 0 0 0 0 1 1 0.50 0.05 1.00 481 96 A1.7 (Studio) 370 0 370 0 0 0 0 1 1 0.50 0.05 1.00 370 0 B1.0 (1BR/1BA Unit) 820 74 894 1 2 2 2 2 9 0.50 0.05 1.00 7,380 666 42% B1.1 (1BR/1BA Unit) 800 74 874 1 1 1 1 1 5 0.50 0.05 1.00 4,000 370 B1.2 (1BR/1BA Unit) 894 148 1,042 1 1 1 1 0 4 0.50 0.05 1.00 3,576 592 B1.3 (1BR/1BA Unit) 747 74 821 3 3 3 3 0 12 0.50 0.05 1.00 8964 888 B1.4 (1BR/1BA Unit) 832 88 920 1 1 1 1 0 4 0.50 0.05 1.00 3328 352 B1.5 (1BR/1BA Unit) 976 627 1603 0 0 0 0 1 1 0.50 0.05 1.00 976 627 B1.6 (1BR/1BA Unit) 622 195 817 0 0 0 0 3 3 0.50 0.05 1.00 1866 585 B1.7 (1BR/1BA Unit) 670 220 890 0 0 0 0 1 1 0.50 0.05 1.00 670 220 B1.8 (1BR/1BA Unit) 623 260 883 0 0 0 0 1 1 0.50 0.05 1.00 623 260 B1.9 (1BR/1BA Unit) 713 611 1324 0 0 0 0 1 1 0.50 0.05 1.00 713 611 C1.0 (2BR/2BA Unit) 1308 0 1,308 1 1 1 1 0 4 0.50 0.10 1.25 5,232 0 13% C1.1 (2BR/2BA Unit) 1,400 58 1,458 1 1 1 1 0 4 0.50 0.10 1.25 5,600 232 C1.2 (2BR/2BA Unit) 1,118 277 1,395 0 0 0 0 1 1 0.50 0.10 1.25 1,118 277 C1.3 (2BR/1BA Unit) 1,223 92 1,315 1 0 0 0 0 1 0.50 0.10 1.25 1223 92 C1.4 (2BR/2BA Unit) 1,240 74 1314 1 0 0 0 0 1 0.50 0.10 1.25 1240 74 Total # dwelling units 16 20 20 20 18 94 67,495 6,553 BMR UNIT BREAKDOWN # VLI (VERY LOW INCOME) UNITS UNIT TYPE STUDIO LOCATION LEVEL 04 1 # LI ( LOW INCOME) UNITS 0 # MOD ( MODERATE INCOME) UNITS 0 TAG A1.2 1BED/1BA B1.3 LEVEL 04 1 0 0 2BED/2BA C1.4 LEVEL 04 1 0 0 STUDIO A1.3 LEVEL 05 1 0 0 1BED/1BA B1.1 LEVEL 05 1 0 0 STUDIO A1.0 LEVEL 06 1 0 0 1BED/1BA B1.3 LEVEL 06 1 0 0 STUDIO A1.0 LEVEL 07 1 0 0 STUDIO A1.2 LEVEL 07 1 0 0 653 AREA (S.F.) 747 1,240 468 800 541 747 541 653 TOTAL BMR UNITS 10 0 0 TOTAL BMR UNITS 111111111 % BMR UNITS 10% 10% 10% 10% 10% 10% 10% 10% 10% 1BED/1BA B1.1 800 LEVEL 07 1 0 0 1 10% 413 of 786 BEDRM 01 BEDRM 02 BATH BATH KITCHEN LIVING DINING WIC CL CLCL W/D EWH CL ENTRANCE 13'-11" 3'-3" 6'-8" X 7'-8" (H) 2'-4" 2'-0"8'-8"
12'-3" 6'-7"
6'-10"
2'-8" 3'-9" 2'-3" 6'-8"
1'-7" 5'-0"
15'-1"
19'-0" 2'-6" 3'-0"3'-4" 6'-0" 4'-2" 7'-3"
2'-0" 2'-6" 10'-0" X 7'-8" (H) 7'-8"
20'-1"
6'-8" X 7'-8" (H) 4'-2"
11'-2" 3'-3" 10'-0" X 7'-8" (H) 14'-2" 6'-10"
6'-11"
13'-7" 26'-5" BEDRM 01 BEDRM 02 BATH BATH KITCHEN LIVING DINING PRIVATE BALCONY CL CL CL W/D EWHENTRANCE 3'-0" 10'-0" X 7'-8" (H) 4'-11" 3'-3" 17'-9"
10'-0" X 7'-8" (H) 4'-9" 10'-0" X 7'-8" (H) 3'-1" 17'-8" 4'-1" 6'-8" 5'-9" 2'-0"
16'-5"
15'-1" 3'-4" 3'-0" 3'-9" 4'-11" 4'-4"
3'-3"
13'-2" 6'-7" 6'-11"
6'-10"
3'-9" 6'-8" X 7'-8" (H) 3'-3"
13'-8" 6'-0" 27'-10" 7'-11"
1'-8" 8'-4" X 7'-8" (H)
10'-11" 2'-6" 20'-5"
4'-11"
24'-7" BEDRM 01 BEDRM 02 BATH BATH KITCHEN LIVING DINING PRIVATE BALCONY CL CL CL W/D EWH ENTRANCE 3'-2" 6'-8" X 7'-8" (H) 3'-4"
13'-2" 3'-2" 6'-8" X 7'-8" (H) 10'-6" 2'-0" 4'-9" 8'-0" 6'-7" 6'-11" 6'-10" 3'-2" 3'-9" 4'-11" 1'-7" 10'-0" X 7'-8" (H) 12'-7" 3'-2" 6'-8" X 7'-8" (H) 5'-9"
15'-7"
2'-0" 4'-4"
2'-1" 10'-0" X 7'-8" (H) 11'-9"
23'-9" 25'-11" 10'-10"
3'-4" 3'-0"
19'-4" 4'-5" 5'-4"
2'-6" 19'-5" BEDRM 01 BEDRM 02 BATH KITCHEN LIVING DINING PRIVATE BALCONY CL CL CL W/D EWH ENTRANCE 3'-8" 10'-0" X 7'-8" (H) 3'-5" 16'-11" 15'-5" 2'-0"
14'-1" 6'-11"
6'-10" 4'-7" 2'-0"
3'-4" 3'-0" 3'-10"2'-8" 13'-6"
3'-11" 16'-10"
5'-6" 10'-0" X 7'-8" (H) 3'-8" 14'-5"
3'-1" 10'-0" X 7'-8" (H)
15'-5"
8'-4" X 7'-8" (H) 3'-9"
16'-0"
2'-6" 33'-7"
11'-5" PROJECT NO: DATE DESCRIPTION
Q:\2022 Jobs\225684 - Nazareth Vista Mixed-Use\01-Planning App\2025-MMDD 3RD PLANNING SUBMITTAL\225684-A511.dwg - Dec 22, 2025, 1:01pm - josephinek The "user(s)" in possession of this documentation acknowledge(s) that ARC TEC's and ARC TEC consultants' drawings, specifications, reports, electronic data and other documentation are instruments of service. ARC TEC and ARC TEC consultants shall be deemed the author and owner of such documentation. The "user(s)" in possession of this documentation shall not use or authorize any other person to use ARC TEC's or ARC TEC consultants' instruments of service. Reuse without ARC TEC's written authorization will be at the user(s) sole risk and without liability to ARC TEC and ARC TEC's consultants. The user(s) possessing this documentation shall indemnify and hold harmless ARC TEC and ARC TEC's consultants and agents and employees from and against all claims, damages losses and expenses, including but not limited to attorneys' fees, arising out of unauthorized reuse of ARC TEC o r ARC TEC' s c o n s u l t a n t s i n s tr ume n t s o f s e r v i c e . Written dimensions on this drawing shall have precedence over any scaled dimension. DO NOT SCALE THIS DRAWING for accurate dimensions and notify ARC TEC of any discrepancies. © Copyright ARC TEC, Inc. 2021 In Association with: A R C T E C ARCHITECTURAL TECHNOLOGIES www.arctecinc.com Arizona 2960 East Northern Avenue, Building C Phoenix, AZ 85028 602.953.2355 California 1731 Technology Drive, Suite 750 San Jose, CA 95110 408.496.0676 225684.11 A Planning Applicationt For:
NAZARETH VISTA
606 - 616 SOUTH B STREET
SAN MATEO, CA 94401 03.26.2025 SB330 APPLICATION 04.30.2025 1ST PLANNING SUBMITTAL 08.11.2025 2ND PLANNING SUBMITTAL 12.16.2025 3RD PLANNING SUBMITTAL PA-2024-039 12 A5.14 ENLARGED UNIT PLANS SCALE: ENLARGED PLAN 2BR/ 2BA TYPE 'C1.0' 1/4" = 1'-0" 1 NET RENTABLE AREA: 1,308 S.F. SCALE: ENLARGED PLAN 2BR/ 2BA TYPE 'C1.1' 1/4" = 1'-0" 2 NET RENTABLE AREA: 1,400 S.F. SCALE: ENLARGED PLAN 2BR/ 2BA TYPE 'C1.2' 1/4" = 1'-0" 3 NET RENTABLE AREA: 1,400 S.F. SCALE: ENLARGED PLAN 2BR/ 1BA TYPE 'C1.3' 1/4" = 1'-0" 4 NET RENTABLE AREA: 1,223 S.F. PROJECT DATA: Residential Units Unit Type Unit Area (S.F.) Balcony Area (S.F.) Unit Area w/Balcony (S.F.) # Unit Level 4 # Unit Level 5 # Unit Level 6 # Unit Level 7 # Unit Level 8 Total # Units Density Bonus Parking Req'd Short-Term Bike Pkg Req'd Long-Term Bike Pkg Req'd Total Unit Area Total Balcony Area Unit Mix A1.0 (Studio) 541 0 541 0 3 3 3 3 12 0.50 0.05 1.00 6,492 0 45% A1.1 (Studio) 660 0 660 0 1 1 1 0 3 0.50 0.05 1.00 1,980 0 A1.2 (Studio) 653 0 653 1 1 1 1 0 4 0.50 0.05 1.00 2,612 0 A1.2A (Studio) 553 92 645 0 1 1 1 0 3 0.50 0.05 1.00 1659 276 A1.3 (Studio) 468 0 468 3 3 3 3 0 12 0.50 0.05 1.00 5,616 0 A1.4 (Studio) 517 0 517 1 1 1 1 0 4 0.50 0.05 1.00 2,068 0 A1.5 (Studio) 507 152 659 0 0 0 0 1 1 0.50 0.05 1.00 507 152 A1.6 (Studio) 442 92 534 0 0 0 0 1 1 0.50 0.05 1.00 442 92 A1.6A (Studio) 481 96 577 0 0 0 0 1 1 0.50 0.05 1.00 481 96 A1.7 (Studio) 370 0 370 0 0 0 0 1 1 0.50 0.05 1.00 370 0 B1.0 (1BR/1BA Unit) 820 74 894 1 2 2 2 2 9 0.50 0.05 1.00 7,380 666 42% B1.1 (1BR/1BA Unit) 800 74 874 1 1 1 1 1 5 0.50 0.05 1.00 4,000 370 B1.2 (1BR/1BA Unit) 894 148 1,042 1 1 1 1 0 4 0.50 0.05 1.00 3,576 592 B1.3 (1BR/1BA Unit) 747 74 821 3 3 3 3 0 12 0.50 0.05 1.00 8964 888 B1.4 (1BR/1BA Unit) 832 88 920 1 1 1 1 0 4 0.50 0.05 1.00 3328 352 B1.5 (1BR/1BA Unit) 976 627 1603 0 0 0 0 1 1 0.50 0.05 1.00 976 627 B1.6 (1BR/1BA Unit) 622 195 817 0 0 0 0 3 3 0.50 0.05 1.00 1866 585 B1.7 (1BR/1BA Unit) 670 220 890 0 0 0 0 1 1 0.50 0.05 1.00 670 220 B1.8 (1BR/1BA Unit) 623 260 883 0 0 0 0 1 1 0.50 0.05 1.00 623 260 B1.9 (1BR/1BA Unit) 713 611 1324 0 0 0 0 1 1 0.50 0.05 1.00 713 611 C1.0 (2BR/2BA Unit) 1308 0 1,308 1 1 1 1 0 4 0.50 0.10 1.25 5,232 0 13% C1.1 (2BR/2BA Unit) 1,400 58 1,458 1 1 1 1 0 4 0.50 0.10 1.25 5,600 232 C1.2 (2BR/2BA Unit) 1,118 277 1,395 0 0 0 0 1 1 0.50 0.10 1.25 1,118 277 C1.3 (2BR/1BA Unit) 1,223 92 1,315 1 0 0 0 0 1 0.50 0.10 1.25 1223 92 C1.4 (2BR/2BA Unit) 1,240 74 1314 1 0 0 0 0 1 0.50 0.10 1.25 1240 74 Total # dwelling units 16 20 20 20 18 94 67,495 6,553 BMR UNIT BREAKDOWN # VLI (VERY LOW INCOME) UNITS UNIT TYPE STUDIO LOCATION LEVEL 04 1 # LI ( LOW INCOME) UNITS 0 # MOD ( MODERATE INCOME) UNITS 0 TAG A1.2 1BED/1BA B1.3 LEVEL 04 1 0 0 2BED/2BA C1.4 LEVEL 04 1 0 0 STUDIO A1.3 LEVEL 05 1 0 0 1BED/1BA B1.1 LEVEL 05 1 0 0 STUDIO A1.0 LEVEL 06 1 0 0 1BED/1BA B1.3 LEVEL 06 1 0 0 STUDIO A1.0 LEVEL 07 1 0 0 STUDIO A1.2 LEVEL 07 1 0 0 653 AREA (S.F.) 747 1,240 468 800 541 747 541 653 TOTAL BMR UNITS 10 0 0 TOTAL BMR UNITS 111111111 % BMR UNITS 10% 10% 10% 10% 10% 10% 10% 10% 10% 1BED/1BA B1.1 800 LEVEL 07 1 0 0 1 10% 414 of 786 BEDRM 01 BEDRM 02 BATH BATH KITCHEN LIVING DINING PRIVATE BALCONY PANTRY CL WIC STUDY W/D EWH ENTRANCE 2'-9" 6'-8" X 7'-8" (H) 2'-5" 14'-3" 11'-10" 2'-7" 8'-4" X 7'-8" (H) 2'-7" 13'-6" 2'-5" 6'-8" 2'-5" 11'-6" 14'-3" CL
5'-1" 6'-7"
4'-0" 2'-0"3'-4"
6'-10" 6'-7"5'-6"
2'-0"
2'-8" 3'-10" 6'-7"
6'-10" 5'-6" 6'-7" 6'-7"
14'-2" 30'-8"
8'-6" 21'-0"
29'-5"
4'-0" 3'-4"3'-0" PROJECT NO: DATE DESCRIPTION
Q:\2022 Jobs\225684 - Nazareth Vista Mixed-Use\01-Planning App\2025-MMDD 3RD PLANNING SUBMITTAL\225684-A511.dwg - Dec 22, 2025, 1:01pm - josephinek The "user(s)" in possession of this documentation acknowledge(s) that ARC TEC's and ARC TEC consultants' drawings, specifications, reports, electronic data and other documentation are instruments of service. ARC TECand ARC TEC consultants shall be deemed the author and owner of suchdocumentation. The "user(s)" in possession of this documentation shall not use or authorize any other person to use ARC TEC's or ARC TEC consultants' instruments of service. Reuse without ARC TEC's written authorization will beat the user(s) sole risk and without liability to ARC TEC and ARC TEC's consultants. The user(s) possessing this documentation shall indemnify and hold harmless ARC TEC and ARC TEC's consultants and agents and employees from and against all claims, damages losses and expenses, including but not limited to attorneys' fees, arising out of unauthorized reuse of ARC TEC o r ARC TEC' s c o n s u l t a n t s i n s tr ume n t s o f s e r v i c e . Written dimensions on this drawing shall have precedence over any scaled dimension. DO NOT SCALE THIS DRAWING for accurate dimensions and notify ARC TEC of any discrepancies. © Copyright ARC TEC, Inc. 2021 In Association with: A R C T E C ARCHITECTURAL TECHNOLOGIES www.arctecinc.com Arizona 2960 East Northern Avenue, Building C Phoenix, AZ 85028 602.953.2355 California 1731 Technology Drive, Suite 750 San Jose, CA 95110 408.496.0676 225684.11 A Planning Applicationt For:
NAZARETH VISTA
606 - 616 SOUTH B STREET
SAN MATEO, CA 94401 03.26.2025 SB330 APPLICATION 04.30.2025 1ST PLANNING SUBMITTAL 08.11.2025 2ND PLANNING SUBMITTAL 12.16.2025 3RD PLANNING SUBMITTAL PA-2024-039 12 A5.15 ENLARGED UNIT PLANS SCALE: ENLARGED PLAN 2BR/ 2BA TYPE 'C1.4' 1/4" = 1'-0" 1 NET RENTABLE AREA: 1,240 S.F. PROJECT DATA: Residential Units Unit Type Unit Area (S.F.) Balcony Area (S.F.) Unit Area w/Balcony (S.F.) # Unit Level 4 # Unit Level 5 # Unit Level 6 # Unit Level 7 # Unit Level 8 Total # Units Density Bonus Parking Req'd Short-Term Bike Pkg Req'd Long-Term Bike Pkg Req'd Total Unit Area Total Balcony Area Unit Mix A1.0 (Studio) 541 0 541 0 3 3 3 3 12 0.50 0.05 1.00 6,492 0 45% A1.1 (Studio) 660 0 660 0 1 1 1 0 3 0.50 0.05 1.00 1,980 0 A1.2 (Studio) 653 0 653 1 1 1 1 0 4 0.50 0.05 1.00 2,612 0 A1.2A (Studio) 553 92 645 0 1 1 1 0 3 0.50 0.05 1.00 1659 276 A1.3 (Studio) 468 0 468 3 3 3 3 0 12 0.50 0.05 1.00 5,616 0 A1.4 (Studio) 517 0 517 1 1 1 1 0 4 0.50 0.05 1.00 2,068 0 A1.5 (Studio) 507 152 659 0 0 0 0 1 1 0.50 0.05 1.00 507 152 A1.6 (Studio) 442 92 534 0 0 0 0 1 1 0.50 0.05 1.00 442 92 A1.6A (Studio) 481 96 577 0 0 0 0 1 1 0.50 0.05 1.00 481 96 A1.7 (Studio) 370 0 370 0 0 0 0 1 1 0.50 0.05 1.00 370 0 B1.0 (1BR/1BA Unit) 820 74 894 1 2 2 2 2 9 0.50 0.05 1.00 7,380 666 42% B1.1 (1BR/1BA Unit) 800 74 874 1 1 1 1 1 5 0.50 0.05 1.00 4,000 370 B1.2 (1BR/1BA Unit) 894 148 1,042 1 1 1 1 0 4 0.50 0.05 1.00 3,576 592 B1.3 (1BR/1BA Unit) 747 74 821 3 3 3 3 0 12 0.50 0.05 1.00 8964 888 B1.4 (1BR/1BA Unit) 832 88 920 1 1 1 1 0 4 0.50 0.05 1.00 3328 352 B1.5 (1BR/1BA Unit) 976 627 1603 0 0 0 0 1 1 0.50 0.05 1.00 976 627 B1.6 (1BR/1BA Unit) 622 195 817 0 0 0 0 3 3 0.50 0.05 1.00 1866 585 B1.7 (1BR/1BA Unit) 670 220 890 0 0 0 0 1 1 0.50 0.05 1.00 670 220 B1.8 (1BR/1BA Unit) 623 260 883 0 0 0 0 1 1 0.50 0.05 1.00 623 260 B1.9 (1BR/1BA Unit) 713 611 1324 0 0 0 0 1 1 0.50 0.05 1.00 713 611 C1.0 (2BR/2BA Unit) 1308 0 1,308 1 1 1 1 0 4 0.50 0.10 1.25 5,232 0 13% C1.1 (2BR/2BA Unit) 1,400 58 1,458 1 1 1 1 0 4 0.50 0.10 1.25 5,600 232 C1.2 (2BR/2BA Unit) 1,118 277 1,395 0 0 0 0 1 1 0.50 0.10 1.25 1,118 277 C1.3 (2BR/1BA Unit) 1,223 92 1,315 1 0 0 0 0 1 0.50 0.10 1.25 1223 92 C1.4 (2BR/2BA Unit) 1,240 74 1314 1 0 0 0 0 1 0.50 0.10 1.25 1240 74 Total # dwelling units 16 20 20 20 18 94 67,495 6,553 (1) BMR UNIT @ LEVEL 04 BMR UNIT BREAKDOWN # VLI (VERY LOW INCOME) UNITS UNIT TYPE STUDIO LOCATION LEVEL 04 1 # LI ( LOW INCOME) UNITS 0 # MOD ( MODERATE INCOME) UNITS
0 TAG A1.2 1BED/1BA B1.3 LEVEL 04 1 0 0 2BED/2BA C1.4 LEVEL 04 1 0 0 STUDIO A1.3 LEVEL 05 1 0 0 1BED/1BA B1.1 LEVEL 05 1 0 0 STUDIO A1.0 LEVEL 06 1 0 0 1BED/1BA B1.3 LEVEL 06 1 0 0 STUDIO A1.0 LEVEL 07 1 0 0 STUDIO A1.2 LEVEL 07 1 0 0 653 AREA (S.F.) 747 1,240 468 800 541 747 541 653 TOTAL BMR UNITS 10 0 0 TOTAL BMR UNITS 111111111 % BMR UNITS 10% 10% 10% 10% 10% 10% 10% 10% 10% 1BED/1BA B1.1 800 LEVEL 07 1 0 0 1 10% 415 of 786
UNAUTHORIZED CHANGES AND USES
CAUTION :
OWNER INFO
EARTHWORK QUANTITIES
PROJECT DESCRIPTION
KEY MAP
CIVIL SHEET INDEX
COVER SHEET C-1.0
CALIFORNIA 1
sandis.net
NAZARETH VISTA
TENTATIVE PARCEL MAP
SAN MATEO 22
SB330 APPLICATION 03/26/25
C 79716
CIVIL
NATHAN D I CK I NSON 1ST PLANNING SUBMITTAL 04/30/25
1 2ND PLANNING SUBMITTAL 08/11/25
2 3RD PLANNING SUBMITTAL 12/16/25
3 4TH PLANNING SUBMITTAL 03/13/26
LEGEND
EXISTING PROPOSED ABBREVIATIONS
VICINITY MAP
SITE
NAZARETH VISTA
TENTATIVE PARCEL MAP
616 SOUTH B STREET SAN MATEO, CA SIXTH AVENUE SEVENTH AVENUE
SOUTH B STREET
616 SOUTH B STREET
CIVIL ENGINEER INFO
GENERAL NOTES
416 of 786
SOUTH B STREET SIXTH AVENUE SEVENTH AVENUE
TOPOGRAPHIC SURVEY C-2.0
CALIFORNIA sandis.net
NAZARETH VISTA
TENTATIVE PARCEL MAP
SAN MATEO 22
SB330 APPLICATION 03/26/25
C 79716
CIVIL
NATHAN D I CK I NSON 1ST PLANNING SUBMITTAL 04/30/25
1 2ND PLANNING SUBMITTAL 08/11/25
2 3RD PLANNING SUBMITTAL 12/16/25
3 4TH PLANNING SUBMITTAL 03/13/26
BENCHMARK
SURVEY NOTES
BOUNDARY NOTE
UNDERGROUND UTILITY NOTE
SITE BENCHMARK
SURVEYOR'S STATEMENT
0'
1 INCH =
4' 10' 20' 40'
20 FT
LEGEND SEE C-2.1 FOR CONTINUATION
2 1 2 3 4 5
417 of 786
EIGHTH AVENUE NINTH AVENUE
TOPOGRAPHIC SURVEY C-2.1
CALIFORNIA 3
sandis.net
NAZARETH VISTA
TENTATIVE PARCEL MAP
SAN MATEO 22
SB330 APPLICATION 03/26/25
C 79716
CIVIL
NATHAN D I CK I NSON 1ST PLANNING SUBMITTAL 04/30/25
1 2ND PLANNING SUBMITTAL 08/11/25
2 3RD PLANNING SUBMITTAL 12/16/25
3 4TH PLANNING SUBMITTAL 03/13/26 SEE C-2.0 FOR CONTINUATION 418 of 786
GENERAL NOTES
LEGEND
SITE LOT DIMENSIONS
ENGINEER INFO
UTILITY PURVEYOR INFO
OWNER INFO
1 2 3 4 5
TENTATIVE PARCEL MAP C-2.2
0'
1 INCH =
4' 10' 20' 40'
20 FT
CALIFORNIA sandis.net
NAZARETH VISTA
TENTATIVE PARCEL MAP
SAN MATEO 22
SB330 APPLICATION 03/26/25
C 79716
CIVIL
NATHAN D I CK I NSON 1ST PLANNING SUBMITTAL 04/30/25
1 2ND PLANNING SUBMITTAL 08/11/25
2 3RD PLANNING SUBMITTAL 12/16/25
3 4TH PLANNING SUBMITTAL 03/13/26 4
LOT "A"
0.64 AC
27,932.4 SF
419 of 786
BUILDING
F.F. = 23.62 BUILDING
F.F. = 23.16
BUILDING
F.F. = 22.61
BUILDING
F.F. = 24.92
BUILDING
F.F. = 24.92
BUILDING
F.F. = 22.75
BUILDING
F.F. = 22.75 SIXTH AVENUE
SOUTH B STREET SEVENTH AVENUE
CALIFORNIA sandis.net
NAZARETH VISTA
TENTATIVE PARCEL MAP
SAN MATEO 22
SB330 APPLICATION 03/26/25
C 79716
CIVIL
NATHAN D I CK I NSON 1ST PLANNING SUBMITTAL 04/30/25
1 2ND PLANNING SUBMITTAL 08/11/25
2 3RD PLANNING SUBMITTAL 12/16/25
3 4TH PLANNING SUBMITTAL 03/13/26
GENERAL NOTES
LEGEND
0'
1 INCH =
4' 10' 20' 40'
20 FT
GRADING NOTES
GRADING AND DRAINAGE PLAN C-3.0
5 420 of 786
20 25
30 20
25 30
0+00 1+00 1+30
18 20
25 18
20 25
0+00 0+70
18 20
25 18
20 25
0+00 0+90
20 25
30 20
25 30
0+00 1+00 1+30
GRADING SECTIONS C-3.1
CALIFORNIA sandis.net
NAZARETH VISTA
TENTATIVE PARCEL MAP
SAN MATEO 22
SB330 APPLICATION 03/26/25
C 79716
CIVIL
NATHAN D I CK I NSON 1ST PLANNING SUBMITTAL 04/30/25
1 2ND PLANNING SUBMITTAL 08/11/25
2 3RD PLANNING SUBMITTAL 12/16/25
3 4TH PLANNING SUBMITTAL 03/13/26 6
421 of 786
SIXTH AVENUE
SOUTH B STREET MATCHLINE - SEE SHEET C-4.1
CALIFORNIA sandis.net
NAZARETH VISTA
TENTATIVE PARCEL MAP
SAN MATEO 22
SB330 APPLICATION 03/26/25
C 79716
CIVIL
NATHAN D I CK I NSON 1ST PLANNING SUBMITTAL 04/30/25
1 2ND PLANNING SUBMITTAL 08/11/25
2 3RD PLANNING SUBMITTAL 12/16/25
3 4TH PLANNING SUBMITTAL 03/13/26
LEGEND
UTILITY PLAN C-4.0
GENERAL NOTES
7 0'
1 INCH =
2' 5' 10' 20'
10 FT
GENERAL NOTES
STORM DRAIN NOTES
SANITARY SEWER NOTES
WATER SYSTEM NOTES SIXTH AVENUE
MATCHLINE SEE LEFT
MATCHLINE SEE RIGHT
LEGEND
422 of786
SOUTH B STREET SEVENTH AVENUE MATCHLINE - SEE SHEET C-4.2 CALIFORNIA sandis.net
NAZARETH VISTA
TENTATIVE PARCEL MAP
SAN MATEO 22
SB330 APPLICATION 03/26/25
C 79716
CIVIL
NATHAN D I CK I NSON 1ST PLANNING SUBMITTAL 04/30/25
1 2ND PLANNING SUBMITTAL 08/11/25
2 3RD PLANNING SUBMITTAL 12/16/25
3 4TH PLANNING SUBMITTAL 03/13/26
GENERAL NOTES
LEGEND
STORM DRAIN NOTES
SANITARY SEWER NOTES
WATER SYSTEM NOTES
UTILITY PLAN C-4.1
GENERAL NOTES
8 MATCHLINE - SEE SHEET C-4.0
0'
1 INCH =
2' 5' 10' 20'
10 FT
LEGEND
423 of786
SOUTH B STREET EIGHTH AVENUE MATCHLINE - SEE SHEET C-4.1 CALIFORNIA sandis.net
NAZARETH VISTA
TENTATIVE PARCEL MAP
SAN MATEO 22
SB330 APPLICATION 03/26/25
C 79716
CIVIL
NATHAN D I CK I NSON 1ST PLANNING SUBMITTAL 04/30/25
1 2ND PLANNING SUBMITTAL 08/11/25
2 3RD PLANNING SUBMITTAL 12/16/25
3 4TH PLANNING SUBMITTAL 03/13/26
LEGEND
UTILITY PLAN C-4.2
GENERAL NOTES
9 0'
1 INCH =
2' 5' 10' 20'
10 FT
GENERAL NOTES
STORM DRAIN NOTES
SANITARY SEWER NOTES
WATER SYSTEM NOTES
424 of786
SIXTH AVENUE SOUTH B STREET
CALIFORNIA sandis.net
NAZARETH VISTA
TENTATIVE PARCEL MAP
SAN MATEO 22
SB330 APPLICATION 03/26/25
C 79716
CIVIL
NATHAN D I CK I NSON 1ST PLANNING SUBMITTAL 04/30/25
1 2ND PLANNING SUBMITTAL 08/11/25
2 3RD PLANNING SUBMITTAL 12/16/25
3 4TH PLANNING SUBMITTAL 03/13/26
LEGEND
SILVA CELLS LAYOUT C-4.3
GENERAL NOTES
0'
1 INCH =
1' 2.5' 5' 10'
5 FT
10 GENERAL NOTES
STORM DRAIN NOTES
SANITARY SEWER NOTES
WATER SYSTEM NOTES
425 of 786
SEVENTH AVENUE SOUTH B STREET
CALIFORNIA sandis.net
NAZARETH VISTA
TENTATIVE PARCEL MAP
SAN MATEO 22
SB330 APPLICATION 03/26/25
C 79716
CIVIL
NATHAN D I CK I NSON 1ST PLANNING SUBMITTAL 04/30/25
1 2ND PLANNING SUBMITTAL 08/11/25
2 3RD PLANNING SUBMITTAL 12/16/25
3 4TH PLANNING SUBMITTAL 03/13/26
LEGEND
SILVA CELLS LAYOUT C-4.4
GENERAL NOTES
0'
1 INCH =
1' 2.5' 5' 10'
5 FT
11 MATCHLINE - SEE RIGHT
MATCHLINE - SEE LEFT SOUTH B STREET
GENERAL NOTES
STORM DRAIN NOTES
SANITARY SEWER NOTES
WATER SYSTEM NOTES
426 of786
CALIFORNIA sandis.net
NAZARETH VISTA
TENTATIVE PARCEL MAP
SAN MATEO 22
SB330 APPLICATION 03/26/25
C 79716
CIVIL NATHAN D I CK I NSON 1ST PLANNING SUBMITTAL 04/30/25 1 2ND PLANNING SUBMITTAL 08/11/25 2 3RD PLANNING SUBMITTAL 12/16/25 3 4TH PLANNING SUBMITTAL 03/13/26
SILVA CELLS SECTION, TRENCH DRAIN
DETAILS C-4.5
12 427 of 786
DMA 02
20,226 SF
TCM 2 - 795 SF OF TREATMENT REQUIRED
DMA 03
14,412 SF
TCM 3 - 445 SF OF TREATMENT REQUIRED
(FLOW-VOLUME COMBO SIZING)
DMA 04
3,852 SF
TCM 4 - 153
SF OF TREATMENT
REQUIRED
TCM 01
368 SF TOTAL PROVIDED
TCM 02
800 SF TOTAL PROVIDED
TCM 03
452 SF TOTAL PROVIDED
TCM 04
166 SF TOTAL PROVIDED
DMA 01
7,695 SF
TCM 1 - 302 SF OF TREATMENT REQUIRED
HYDROMODIFICATION NOTE:
SITE TREATMENT AREA NOTE:
STORMWATER MANAGEMENT NOTES:
STORMWATER
MANAGEMENT PLAN LEGEND
STORMWATER MANAGEMENT PLAN C-5.0 SIXTH AVENUE
SOUTH B STREET SEVENTH AVENUE
0'
1 INCH =
4' 10' 20' 40'
20 FT
CALIFORNIA sandis.net
NAZARETH VISTA
TENTATIVE PARCEL MAP
SAN MATEO 22
SB330 APPLICATION 03/26/25
C 79716
CIVIL
NATHAN D I CK I NSON 1ST PLANNING SUBMITTAL 04/30/25
1 2ND PLANNING SUBMITTAL 08/11/25
2 3RD PLANNING SUBMITTAL 12/16/25
3 4TH PLANNING SUBMITTAL 03/13/26 13
428 of 786
STORMWATER MANAGEMENT DETAILS C-5.1
SECTION
FOR INFORMATIONAL USE ONLY - NOT FOR CONSTRUCTION
SECTION
CALIFORNIA sandis.net
NAZARETH VISTA
TENTATIVE PARCEL MAP
SAN MATEO 22
SB330 APPLICATION 03/26/25
C 79716
CIVIL
NATHAN D I CK I NSON 1ST PLANNING SUBMITTAL 04/30/25
1 2ND PLANNING SUBMITTAL 08/11/25
2 3RD PLANNING SUBMITTAL 12/16/25
3 4TH PLANNING SUBMITTAL 03/13/26 14
429 of786
STORMWATER MANAGEMENT DETAILS
FLOW VOLUME COMBO SIZING
CALCULATION
C-5.2
CALIFORNIA sandis.net
NAZARETH VISTA
TENTATIVE PARCEL MAP
SAN MATEO 22
SB330 APPLICATION 03/26/25
C 79716
CIVIL NATHAN D I CK I NSON 1ST PLANNING SUBMITTAL 04/30/25 1 2ND PLANNING SUBMITTAL 08/11/25 2 3RD PLANNING SUBMITTAL 12/16/25 3 4TH PLANNING SUBMITTAL 03/13/26 15 430 of 786
WATER POLLUTION CONTROL NOTES:
LEGEND
EROSION CONTROL PLAN C-6.0
0'
1 INCH =
4' 10' 20' 40'
20 FT SIXTH AVENUE
SOUTH B STREET SEVENTH AVENUE
CALIFORNIA sandis.net
NAZARETH VISTA
TENTATIVE PARCEL MAP
SAN MATEO 22
SB330 APPLICATION 03/26/25
C 79716
CIVIL
NATHAN D I CK I NSON 1ST PLANNING SUBMITTAL 04/30/25
1 2ND PLANNING SUBMITTAL 08/11/25
2 3RD PLANNING SUBMITTAL 12/16/25
3 4TH PLANNING SUBMITTAL 03/13/26 16
431 of 786
EROSION CONTROL DETAILS C-6.1
CALIFORNIA sandis.net
NAZARETH VISTA
TENTATIVE PARCEL MAP
SAN MATEO 22
SB330 APPLICATION 03/26/25
C 79716
CIVIL NATHAN D I CK I NSON 1ST PLANNING SUBMITTAL 04/30/25 1 2ND PLANNING SUBMITTAL 08/11/25 2 3RD PLANNING SUBMITTAL 12/16/25 3 4TH PLANNING SUBMITTAL 03/13/26 17 432 of 786
COUNTY BMP SHEET C-6.2
CALIFORNIA sandis.net
NAZARETH VISTA
TENTATIVE PARCEL MAP
SAN MATEO 22
SB330 APPLICATION 03/26/25
C 79716
CIVIL NATHAN D I CK I NSON 1ST PLANNING SUBMITTAL 04/30/25 1 2ND PLANNING SUBMITTAL 08/11/25 2 3RD PLANNING SUBMITTAL 12/16/25 3 4TH PLANNING SUBMITTAL 03/13/26 18 433 of 786
LEGEND
FIRE FLOW REQUIREMENTS
FIRE PROTECTION NOTES
FIRE ACCESS PLAN C-7.0
0'
1 INCH =
4' 10' 20' 40'
20 FT SIXTH AVENUE
SOUTH B STREET SEVENTH AVENUE
CALIFORNIA sandis.net
NAZARETH VISTA
TENTATIVE PARCEL MAP
SAN MATEO 22
SB330 APPLICATION 03/26/25
C 79716
CIVIL
NATHAN D I CK I NSON 1ST PLANNING SUBMITTAL 04/30/25
1 2ND PLANNING SUBMITTAL 08/11/25
2 3RD PLANNING SUBMITTAL 12/16/25
3 4TH PLANNING SUBMITTAL 03/13/26 19
434 of 786
SIXTH AVENUE
SOUTH B STREET SEVENTH AVENUE
CALIFORNIA sandis.net
NAZARETH VISTA
TENTATIVE PARCEL MAP
SAN MATEO 22
SB330 APPLICATION 03/26/25
C 79716
CIVIL
NATHAN D I CK I NSON 1ST PLANNING SUBMITTAL 04/30/25
1 2ND PLANNING SUBMITTAL 08/11/25
2 3RD PLANNING SUBMITTAL 12/16/25
3 4TH PLANNING SUBMITTAL 03/13/26
SIGNING AND STRIPING C-8.0
0'
1 INCH =
4' 10' 20' 40'
20 FT
20 435 of 786
LEGEND
TRUCK TURNING MOVEMENTS C-9.0
0'
1 INCH =
4' 10' 20' 40'
20 FT
SOUTH B STREET SEVENTH AVENUE
FIRE TRUCK
SOUTH B STREET SEVENTH AVENUE
CALIFORNIA sandis.net
NAZARETH VISTA
TENTATIVE PARCEL MAP
SAN MATEO 22
SB330 APPLICATION 03/26/25
C 79716
CIVIL
NATHAN D I CK I NSON 1ST PLANNING SUBMITTAL 04/30/25
1 2ND PLANNING SUBMITTAL 08/11/25
2 3RD PLANNING SUBMITTAL 12/16/25
3 4TH PLANNING SUBMITTAL 03/13/26 21
436 of 786
TRUCK TURNING MOVEMENTS C-9.1
0'
1 INCH =
4' 10' 20' 40'
20 FT
LEGEND
SOUTH B STREET SEVENTH AVENUE
FIRE TRUCK
CALIFORNIA sandis.net
NAZARETH VISTA
TENTATIVE PARCEL MAP
SAN MATEO 22
SB330 APPLICATION 03/26/25
C 79716
CIVIL
NATHAN D I CK I NSON 1ST PLANNING SUBMITTAL 04/30/25
1 2ND PLANNING SUBMITTAL 08/11/25
2 3RD PLANNING SUBMITTAL 12/16/25
3 4TH PLANNING SUBMITTAL 03/13/26 22
437 of 786
Preliminary Site Plan B S T R E E T Area of Improvement - Scope of Work Project Location 0' 5' 10' 20'
S I X T H
A V E N U E
S E V E N T H
A V E N U E PROJECT NO: DATE DESCRIPTION
Z:\cadfile\cadfiles\Projects_22\22-2484 - Naz Vista\Drawings\Plans\Prelim-2025\Pre2484r5.dwg - Mar 18, 2026, 12:45pm - Natalie The "user(s)" in possession of this documentation acknowledge(s) that ARC TEC's and ARC TEC consultants' drawings, specifications, reports, electronic data and other documentation are instruments of service. ARC TEC and ARC TEC consultants shall be deemed the author and owner of such documentation. The "user(s)" in possession of this documentation shall not use or authorize any other person to use ARC TEC's or ARC TEC consultants' instruments of service. Reuse without ARC TEC's written authorization will be at the user(s) sole risk and without liability to ARC TEC and ARC TEC's consultants. The user(s) possessing this documentation shall indemnify and hold harmless ARC TEC and ARC TEC's consultants and agents and employees from and against all claims, damages losses and expenses, including but not limited to attorneys' fees, arising out of unauthorized reuse of ARC TEC o r ARC TEC' s c o n s u l t a n t s i n s tr ume n t s o f s e r v i c e . Written dimensions on this drawing shall have precedence over any scaled dimension. DO NOT SCALE THIS DRAWING for accurate dimensions and notify ARC TEC of any discrepancies. © Copyright ARC TEC, Inc. 2023 In Association with: A R C T E C ARCHITECTURAL TECHNOLOGIES www.arctecinc.com Arizona 2960 East Northern Avenue, Building C Phoenix, AZ 85028 602.953.2355 California 1731 Technology Drive, Suite 750 San Jose, CA 95110 408.496.0676 STATE OF CAL IFORNIA LICENSED LANDSCAPE ARCHITECT Renewal Date Date Signature THOMAS W. HOLLOWAY #3589 225684.11/KLA22-2484 A Preliminary Application for:
NAZARETH VISTA
606 - 616 SOUTH B STREET
SAN MATEO, CA 94401 11.11.2024 SB330 APPLICATION 04.30.2025 PLANNING APPLICATION 1 08.11.2025 2nd PLANNING SUBMITTAL PA-2024-039 2 12.16.2025 3rd PLANNING SUBMITTAL 3 01.14.2016 Revisions per Arborist Comments Residential Fitness Center Retail Ramp to Lower Level Parking Garage Residential Lobby Mail Elevators Stair #01 Parcels Fire Pump Stair #02 Generator Trash Electrical Retail / Visitor Parkind Irrigation The entire site will be irrigated using a fully automatic system and designed to meet the City's Water Efficient Landscaping Ordinance (WELO). The irrigation system will be subsurface drip lines with in-pipe emitters at regular spacing for even distribution in the at-grade planters. The street trees will be irrigated with deep root bubblers on a separate circuit from the rest of the irrigation. The system will include in-line valves, quick couplers, and gate valves. The irrigation controller will be a "smart" controller by Rainbird, Toro, Hunter, or equal. A complete irrigation design with these parameters will be provided with the submittal of building permit plans. The landscape design concept for the new office building is to provide a functional, enjoyable, and aesthetic space for the employees and guests that fits within the landscape framework of the surrounding area. Plant material has been selected that performs well in the conditions of the Bay Area - San Mateo (Sunset Zone #15). No turf areas are being added. Low and medium water-use hardy trees, shrubs, grasses, and groundcover are proposed for the landscape around building. There is a limited amount of at-grade planting on 6th Ave. with plants in containers for the rest of the streetscape planting (B St. and 7th Ave.). There are street in tree grates in accordance with the Downtown San Mateo Design Guidelines. The landscape (and associated irrigation) has been designed to be compliant with City of San Mateo's Water Efficient Landscape Ordinance. Special considerations have been provided in selection of plant material that respects the needs of the office users as well as the guests. Clear and secure view corridors have been provided to ensure safety of people entering the building as well as moving around the site. Landscape Concept Corner bulb-out with curb ramps
Street light - typical
Enhanced paving at the corner entry -
All enhanced paving is within the
private property and not in the
Right-of-Way
Accent plants in containers
Street light - typical
Bench within the brick strip per theDowntown Specific Plan Natural gray concrete paving
with grid score joints per the
City standards One bike rack - 2 bikes 4' wide brick paving furniture zone per Sidewalk Standards Street trees in tree grates at approx. 30' on center. Tree grate per Downtown Specific Plan Driveway apron
Bike locker (2 bicycles)
Linear containers with accent plants
along the face of the windows
Bench within the brick strip per theDowntown Specific Plan Accent stone or tile paving along the
strip under the containers along the
face of the building (not in the RoW) Upright round containers in-line with architectural columns Street trees in tree grates at approx. 30' on center. Tree grate per
Downtown Specific Plan
4' wide brick paving furniture zone
per Sidewalk Standards
Street light - typical
Enhanced paving at the corner entry -
All enhanced paving is within the
private property and not in the
Right-of-Way
Accent plants in containers
Street light - typical
4' wide brick paving furniture zone
per Sidewalk Standards
Street trees in tree grates at approx.
30' on center. Tree grate per
Downtown Specific Plan Two bike racks - 4 bikes Enhanced paving with modular seating elements At-grade planter with evergreen hedge Small light and airy accent tree (Fruitless Olive) At-grade planter with shrubs and groundcovers with a variety of leaf color, form, and texture Upright evergreen shrubs to accentuate architectural character Driveway apron At-grade planter with shrubs and
groundcovers with a variety of leaf
color, form, and texture to screen the
transformer (below grade)
Upright evergreen shrubs to accentuate architectural character Bench on concrete pad Small light and airy accent tree
(Fruitless Olive)
Street trees in tree grates at approx.
30' on center. Tree grate per
Downtown Specific Plan
4' wide brick paving furniture zone
per Sidewalk Standards
Natural gray concrete paving with
grid score joints per the City standards Natural gray concrete paving with grid score joints per the City standards Natural gray concrete paving with grid score joints per the City standards The Preliminary Plant Palette represents a sampling of the types of shrubs and groundcovers that we anticipate to be appropriate for the location as well as the design style and overall theme.
This is the list from which plant selection will be drawn from. Not all plants listed within this plant palette will be used in the final design and some plants not listed may be introduced. However, the planting design intent will remain consistent with this plan and plant palette.
Mulch to be evenly distributed throughout all shrub and groundcover areas unless otherwise noted on plans. Mulch to be nitrogen stabilized, max. 3/4",recycled material installed at min. 3" depth. "Gorilla-Hair" is not acceptableunless specifically noted for slope areas.
Non-Living Groundcover Grasses or Accent Plants - 5 gal. @ 24"-36" O.C. See Sheet L0.4 Preliminary Plant Palette Street Trees - All are proposed to be 36"-Box 6th Ave. Handroanthus heptaphyllus Pink Trumpet Tree 7th Ave. Handroanthus heptaphyllus Pink Trumpet Tree B St. Ginkgo biloba 'Autumn Gold' Maidenhair Tree Shrubs Accent Planting - 5 gal. @ 30"-36" O.C. See Sheet L0.4 Spikey Accent Plants - 5 gal. @ 24"-30" O.C. See Sheet L0.4 Evergreen Groundcover - 5 gal. @ 30"-36" O.C. See Sheet L0.4 Espalier - 15 gal. See Sheet L0.4 Columnar Accent Plant - 15 gal. See Sheet L0.4 Middle Planting - 5 gal. @ 30"-36" O.C. See Sheet L0.4 Small Plants - 1 gal. @ 24"-30" O.C. See Sheet L0.4 Accent tree in tree grate as per requirements for silva-cell storm drainage 438 of 786
NO PARKING NO PARKING COMPACT COMPACT VAN COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT/ EV CAPABLE COMPACT TURN AROUND COMPACT/ COMPACT EV CAPABLE LEVEL 2 EVCS LEVEL 2 EVCS LEVEL 2 EVCS STANDARD ACCESSIBLE LEVEL 2 EVCS VAN ACCESSIBLE Ground Floor Materials B S T R E E T 0' 8' 16' 32'
S I X T H A V E N U E
S E V E N T H A V E N U E PROJECT NO: DATE DESCRIPTION
Z:\cadfile\cadfiles\Projects_22\22-2484 - Naz Vista\Drawings\Plans\Prelim-2025\Pre2484r5.dwg - Mar 18, 2026, 12:49pm - Natalie The "user(s)" in possession of this documentation acknowledge(s) that ARC TEC's and ARC TEC consultants' drawings, specifications, reports, electronic data and other documentation are instruments of service. ARC TEC and ARC TEC consultants shall be deemed the author and owner of such documentation. The "user(s)" in possession of this documentation shall not use or authorize any other person to use ARC TEC's or ARC TEC consultants' instruments of service. Reuse without ARC TEC's written authorization will be at the user(s) sole risk and without liability to ARC TEC and ARC TEC's consultants. The user(s) possessing this documentation shall indemnify and hold harmless ARC TEC and ARC TEC's consultants and agents and employees from and against all claims, damages losses and expenses, including but not limited to attorneys' fees, arising out of unauthorized reuse of ARC TEC o r ARC TEC' s c o n s u l t a n t s i n s tr ume n t s o f s e r v i c e . Written dimensions on this drawing shall have precedence over any scaled dimension. DO NOT SCALE THIS DRAWING for accurate dimensions and notify ARC TEC of any discrepancies. © Copyright ARC TEC, Inc. 2023 In Association with: A R C T E C ARCHITECTURAL TECHNOLOGIES www.arctecinc.com Arizona 2960 East Northern Avenue, Building C Phoenix, AZ 85028 602.953.2355 California 1731 Technology Drive, Suite 750 San Jose, CA 95110 408.496.0676 STATE OF CAL IFORNIA LICENSED LANDSCAPE ARCHITECT Renewal Date Date Signature THOMAS W. HOLLOWAY #3589 225684.11/KLA22-2484 A Preliminary Application for:
NAZARETH VISTA
606 - 616 SOUTH B STREET
SAN MATEO, CA 94401 11.11.2024 SB330 APPLICATION 04.30.2025 PLANNING APPLICATION 1 08.11.2025 2nd PLANNING SUBMITTAL PA-2024-039 2 12.16.2025 3rd PLANNING SUBMITTAL 3 01.14.2016 Revisions per Arborist Comments Ground Floor - Materials / Products Brick paving - per City of San Mateo Design Guidelines. McNear Brick and Block - Commercial Series. Color: Tangiers or McNear Flash. Tree grate - per City of San Mateo Design Guidelines. Urban Accessories - OT - Title 24. Color: Powdercoat RAL 6004 Bench - per City of San Mateo Design Guidelines. Wabash Valley - Estate Series 72" with intermediate armrest. Color: Black powder coat Trash receptacle - Wabash Valley Urbanscape "J" style 32 gallon Receptacle. Color: Black powder coat Bike rack - Welle Circular Rack - WCR02-IG. Finish to be stainless steel. Natural Gray Concrete Paving per City of San Mateo Public Works Dept. requirements Colored concrete with saw cut score joints and water-etch finish using TopCast releasing agent Narrow Modular Pavers available from Stepstone (or approved equal) in color blend of Agave, Granada White, and Porcelain 2"x2" Porfido cobblestone available from ArmStone - Under containers Ground Floor - Paving Materials Ground Floor - Furnishings Seating - Montara Linear precast concrete and wood benches available from Tournesol SiteWorks (or approved equal) - 30" wide and in 5', 6' and 8' lengths. Ground Floor - Containers For container locations see sheet L0.4 439 of 786 Preliminary 4th Floor Plan B S T R E E T
S I X T H A V E N U E
S E V E N T H A V E N U E PROJECT NO: DATE DESCRIPTION
Z:\cadfile\cadfiles\Projects_22\22-2484 - Naz Vista\Drawings\Plans\Prelim-2025\Pre2484r5.dwg - Mar 18, 2026, 12:50pm - Natalie The "user(s)" in possession of this documentation acknowledge(s) that ARC TEC's and ARC TEC consultants' drawings, specifications, reports, electronic data and other documentation are instruments of service. ARC TEC and ARC TEC consultants shall be deemed the author and owner of such documentation. The "user(s)" in possession of this documentation shall not use or authorize any other person to use ARC TEC's or ARC TEC consultants' instruments of service. Reuse without ARC TEC's written authorization will be at the user(s) sole risk and without liability to ARC TEC and ARC TEC's consultants. The user(s) possessing this documentation shall indemnify and hold harmless ARC TEC and ARC TEC's consultants and agents and employees from and against all claims, damages losses and expenses, including but not limited to attorneys' fees, arising out of unauthorized reuse of ARC TEC o r ARC TEC' s c o n s u l t a n t s i n s tr ume n t s o f s e r v i c e . Written dimensions on this drawing shall have precedence over any scaled dimension. DO NOT SCALE THIS DRAWING for accurate dimensions and notify ARC TEC of any discrepancies. © Copyright ARC TEC, Inc. 2023 In Association with: A R C T E C ARCHITECTURAL TECHNOLOGIES www.arctecinc.com Arizona 2960 East Northern Avenue, Building C Phoenix, AZ 85028 602.953.2355 California 1731 Technology Drive, Suite 750 San Jose, CA 95110 408.496.0676 STATE OF CAL IFORNIA LICENSED LANDSCAPE ARCHITECT Renewal Date Date Signature THOMAS W. HOLLOWAY #3589 225684.11/KLA22-2484 A Preliminary Application for:
NAZARETH VISTA
606 - 616 SOUTH B STREET
SAN MATEO, CA 94401 11.11.2024 SB330 APPLICATION 04.30.2025 PLANNING APPLICATION 1 08.11.2025 2nd PLANNING SUBMITTAL PA-2024-039 2 12.16.2025 3rd PLANNING SUBMITTAL 3 01.14.2016 Revisions per Arborist Comments 0' 4' 8' 16' Planted containers to screen the bedrooms 'Hang-out' space with synthetic lawn and blocks of various heights and sizes Large containers with small trees Linear row of 42" tall containers with plants Built-in counter with grill and sink KLA recommends this window be removed Outdoor dining - tables and chairs Bar counter Shade structure with TVs Planted containers to screen the bedrooms Low fence - Private patio barrier Planted containers to screen the bedrooms Low seat wall 'bench' seating Synthetic lawn informal recreation Large containers with small trees Large TV screen mounted to wall Informal seating Low seat wall 'bench' seating Synthetic lawn informal recreation - Area for seating for 'movie night' Large containers with trees are set on column locations Double-sided fireplace with seating on both sides
Posts with string lights
Informal seating Linear row of 42" tall containers with plants Linear row of 42" tall containers with plants 5' wide pedestal paver walkway
Community Center Private Patio Private Patio Private Patio Main Walkway (5' wide) Synthetic Lawn Paver Patio Paver Dining Wood Flooring Bar Wood Flooring Paver Dining Synthetic Lawn Synthetic Lawn Trellis / Shade Cover Concept Imagery Planting Containers - See Planted Container Table on Sheet L0.4 Structural Wood Tiles on Pedestals Precast Concrete Pavers 440 of 786 NO PARKING NO PARKING COMPACT COMPACT VAN COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT/ EV CAPABLE COMPACT TURN AROUND COMPACT/ COMPACT EV CAPABLE LEVEL 2 EVCS LEVEL 2 EVCS LEVEL 2 EVCS STANDARD ACCESSIBLE LEVEL 2 EVCS VAN ACCESSIBLE HAN HEP36" box2 GIN AG36" box7 HAN HEP36" box3 OLE SH 36" box 3 LIG TEX 15 gal 4 AGA BG 5 gal 4 DEL COO 4" pots 24 DIA CB 5 gal 12 POD ESP 24" box 1 LIG TEX 15 gal 3DIA CB 5 gal 14 LIG TEX 15 gal 4 POD ESP 24" box 4 ANI BR 5 gal 2 DAS WHE 5 gal 2 GIN AG36" box7 Planting Plan PROJECT NO: DATE DESCRIPTION Z:\cadfile\cadfiles\Projects_22\22-2484 - Naz Vista\Drawings\Plans\Prelim-2025\Pre2484r5.dwg - Mar 18, 2026, 12:55pm - Natalie The "user(s)" in possession of this documentation acknowledge(s) that ARC TEC's and ARC TEC consultants' drawings, specifications, reports, electronic data and other documentation are instruments of service. ARC TEC and ARC TEC consultants shall be deemed the author and owner of such documentation. The "user(s)" in possession of this documentation shall not use or authorize any other person to use ARC TEC's or ARC TEC consultants' instruments of service. Reuse without ARC TEC's written authorization will be at the user(s) sole risk and without liability to ARC TEC and ARC TEC's consultants. The user(s) possessing this documentation shall indemnify and hold harmless ARC TEC and ARC TEC's consultants and agents and employees from and against all claims, damages losses and expenses, including but not limited to attorneys' fees, arising out of unauthorized reuse of ARC TEC o r ARC TEC' s c o n s u l t a n t s i n s tr ume n t s o f s e r v i c e . Written dimensions on this drawing shall have precedence over any scaled dimension. DO NOT SCALE THIS DRAWING for accurate dimensions and notify ARC TEC of any discrepancies. © Copyright ARC TEC, Inc. 2023 In Association with: A R C T E C ARCHITECTURAL TECHNOLOGIES www.arctecinc.com Arizona 2960 East Northern Avenue, Building C Phoenix, AZ 85028 602.953.2355 California 1731 Technology Drive, Suite 750 San Jose, CA 95110 408.496.0676 STATE OF CAL IFORNIA LICENSED LANDSCAPE ARCHITECT Renewal Date Date Signature THOMAS W. HOLLOWAY #3589 225684.11/KLA22-2484 A Preliminary Application for:
NAZARETH VISTA
606 - 616 SOUTH B STREET
SAN MATEO, CA 94401 11.11.2024 SB330 APPLICATION 04.30.2025 PLANNING APPLICATION 1 08.11.2025 2nd PLANNING SUBMITTAL PA-2024-039 2 12.16.2025 3rd PLANNING SUBMITTAL 3 01.14.2016 Revisions per Arborist Comments Plant Imagery
Agave 'Blue Glow'Anigozanthos 'Bush Ranger'
Dasylerion wheeleri Delosperma cooperi Dianella caerulea 'Cassa Blue' Podocarpus gracilior 'Espalier' Handroanthus heptaphyllus 0' 5' 10' 20' CODE BOTANICAL NAME COMMON NAME CONT QTY WATER USE TREES GIN AG Ginkgo biloba 'Autumn Gold' Autumn Gold Maidenhair Tree 36" box 8 Medium HAN HEP Handroanthus heptaphyllus Pink Trumpet Tree 36" box 5 Medium OLE SH Olea europaea 'Swan Hill' Swan Hill Fruitless Olive 36" box 3 Low SYMBOL CODE BOTANICAL NAME COMMON NAME SIZE QTY WATER USE SHRUBS AGA BG Agave x 'Blue Glow' Blue Glow Agave 5 gal 4 Low ANI BR Anigozanthos x 'Bush Ranger' Bush Ranger Kangaroo Paw 5 gal 2 Low DAS WHE Dasylirion wheeleri Grey Desert Spoon 5 gal 2 Low DIA CB Dianella caerulea 'Cassa Blue' Flax Lily 5 gal 26 Low LIG TEX Ligustrum japonicum 'Texanum' Texas Japanese Privet 15 gal 11 Medium ESPALIER POD ESP Podocarpus gracilior 'Espalier' Fern Pine Espalier 24" box 9 Medium SYMBOL CODE BOTANICAL NAME COMMON NAME CONT SPACING QTY WATER USE GROUND COVERS DEL COO Delosperma cooperi Purple Ice Plant 4" pots 18" o.c. 24 Low PLANT SCHEDULE PRELIM Misc. Landscape Materials All shrub and groundcover areas shall be top-dressed with a 3" layer of mulch derived from recycled wood chips or arbor chips from tree trimming. Mulch shall be 2" minus in length and not greater than 3/8" in thickness, and shall be dark brown in color. Contractor shall provide sample for approval prior to installation. Shredded redwood or cedar bark ("Gorilla-Hair") is not acceptable.
Ginkgo biloba 'Autumn Gold'
Olea europaea 'Swan Hill'
Ligustrum japonicum 'Texanum'
Landscape AreasAt-grade landscape Tree Grates Container Surface Total: 367 sf 42% 300 sf 34% 212 sf 24% 879 sf 100% The total landscape area is 879 sf. This project is less than 1,000 sf of landscape and therefore is not subject tothe City of San Mateo requirements for Water Efficient Landscape Ordinance (WELO) documentation. For container locations see sheet L0.4 441 of 786 NO PARKING NO PARKING COMPACT COMPACT VAN COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT/ EV CAPABLE COMPACT TURN AROUND COMPACT/ COMPACT EV CAPABLE LEVEL 2 EVCS LEVEL 2 EVCS LEVEL 2 EVCS STANDARD ACCESSIBLE LEVEL 2 EVCS VAN ACCESSIBLE T5 T3 T4 T2 T7 T6 T1 T8 Tree Disposition 0' 8' 16' 32' PROJECT NO: DATE DESCRIPTION Z:\cadfile\cadfiles\Projects_22\22-2484 - Naz Vista\Drawings\Plans\Prelim-2025\Pre2484r5.dwg - Mar 18, 2026, 12:51pm - Natalie The "user(s)" in possession of this documentation acknowledge(s) that ARC TEC's and ARC TEC consultants' drawings, specifications, reports, electronic data and other documentation are instruments of service. ARC TEC and ARC TEC consultants shall be deemed the author and owner of such documentation. The "user(s)" in possession of this documentation shall not use or authorize any other person to use ARC TEC's or ARC TEC consultants' instruments of service. Reuse without ARC TEC's written authorization will be at the user(s) sole risk and without liability to ARC TEC and ARC TEC's consultants. The user(s) possessing this documentation shall indemnify and hold harmless ARC TEC and ARC TEC's consultants and agents and employees from and against all claims, damages losses and expenses, including but not limited to attorneys' fees, arising out of unauthorized reuse of ARC TEC o r ARC TEC' s c o n s u l t a n t s i n s tr ume n t s o f s e r v i c e . Written dimensions on this drawing shall have precedence over any scaled dimension. DO NOT SCALE THIS DRAWING for accurate dimensions and notify ARC TEC of any discrepancies. © Copyright ARC TEC, Inc. 2023 In Association with: A R C T E C ARCHITECTURAL TECHNOLOGIES www.arctecinc.com Arizona 2960 East Northern Avenue, Building C Phoenix, AZ 85028 602.953.2355 California 1731 Technology Drive, Suite 750 San Jose, CA 95110 408.496.0676 STATE OF CAL IFORNIA LICENSED LANDSCAPE ARCHITECT Renewal Date Date Signature THOMAS W. HOLLOWAY #3589 225684.11/KLA22-2484 A Preliminary Application for:
NAZARETH VISTA
606 - 616 SOUTH B STREET
SAN MATEO, CA 94401 11.11.2024 SB330 APPLICATION 04.30.2025 PLANNING APPLICATION 1 08.11.2025 2nd PLANNING SUBMITTAL PA-2024-039 2 12.16.2025 3rd PLANNING SUBMITTAL 3 01.14.2016 Revisions per Arborist Comments Existing Trees
Arborist Report
Existing Tree Disposition
Existing Trees to be removed
Number corresponds to Tree Evaluation Schedule provided in Arborist's ReportBlue 'X' are trees per the arborist report - All on-site trees are to be removed Green 'O' are existing trees to remain that are not impacted by this project and no action is proposed T1T9 B S T R E E T
S I X T H
A V E N U E
S E V E N T H
A V E N U E
Existing 12" Magnolia tree to remain -
No mitigation required per Arborist
report Tree Valuation Forms On-Site Trees Off-Site Trees (Street Trees) Note - The In-Lieu fee for tree mitigation changes annually associated with the City Fiscal Year. At the time of building permit, the fee may be different and the total mitigation may need to be recalculated.
442 of 786
sandis.net CALIFORNIA NAZARETH VISTA CONDOMINIUM SAN MATEO PROPOSED PHOTOMETRIC EXHIBIT PM-2
SIXTH AVENUESOUTH B STREET
SEVENTH AVENUE ILLUMINANCE VALUES LEGEND 0' 1 INCH = 4' 10' 20' 40' 20 FT LIGHTING FIXTURE SCHEDULE 443 of 786 35ft Front End Loader Overall Length 35.000ft Overall Width 8.330ft Overall Body Height 1.400ft Min Body Ground Clearance 1.400ft Track Width 8.000ft Lock-to-lock time 4.00s Curb to Curb Turning Radius 32.000ft NO PARKING NO COMPACT COMPACT PARKING UP 20% VAN COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT/ EV CAPABLE COMPACT TURN AROUND ELEV 01 ## ELEV 02 ## STAIR #01 ## UP RETAIL/ VISITOR PARKING ## GENERATOR ## ELECTRICAL ## FIRE PUMP ## PARCELS ## EMR ## RESIDENTIAL LOBBY ## MAIL ## RETAIL ## STAIR #02 ## A 1 B C D E F G H K 2452.2 2.5 C.1 2.73 B.3 B.5 J 1 A4.11 4.5 A.6 B.6 B.6 D.4 F.6 G.4 H.2 J.1 10'-11" 6'-1" 7'-6" 5'-6" 6'-1" 8'-11" 6'-0" 9'-0" 12'-6" 11'-4" 16'-2" 27'-6" 15'-4" 12'-2" 11'-10" 16'-8" 7'-3" 22'-3" 2'-11" 11'-1" 227'-0" 15'-11" 10'-7" 8'-1" 8'-2" 32'-0" 14'-9" 12'-3"
102'-11" 2 A4.11 COMPACT/ EV CAPABLE COMPACT LEVEL 2 EVCS LEVEL 2 EVCS LEVEL 2 EVCS STANDARD ACCESSIBLE LEVEL 2 EVCS VAN ACCESSIBLE RESI. FITNESS CENTER ## UP 10% S. B S T R E E T 7 T H A V E N U E
6 T H A V E N U E
45'-0" 45'-0"
10'-0" 10'-0" 10'-0"10'-0" 45'-0" OC 3CY FL COMPACTOR WASTE SPARE 3CY FL COMPACTOR RECYCLING SPARE 3CY FL COMPACTOR CONTAINER WASTE 4CY FL COMPACTOR REC 4CY FL COMPACTOR CONTAINER WASTE A1000 COMPACTOR LOOSE
2CY FL COMPOST CHAIN LINK FENCE 6'-8" STS 500 SSL STS 500 SSL 3CY FL COMPACTOR CONTAINER RECYCLING MCP MCP AC (2) TOTAL STACKED POWER PACKS W/ DISCONNECTS A1000 COMPACTOR 2CY FL LOOSE COMPOST 2CY FL LOOSE COMPOST FD 36'-0"
16'-0" 65'-0"
21'-6" PROJECT NO: DATE DESCRIPTION
/Users/daisyurbina/Desktop/251014_ATM_161 S B- Street_San Mateo.dwg - Oct 15, 2025, 1:43pm - daisyurbina The "user(s)" in possession of this documentation acknowledge(s) that ARC TEC's and ARC TEC consultants' drawings, specifications, reports, electronic data and other documentation are instruments of service. ARC TEC and ARC TEC consultants shall be deemed the author and owner of such documentation. The "user(s)" in possession of this documentation shall not use or authorize any other person to use ARC TEC's or ARC TEC consultants' instruments of service. Reuse without ARC TEC's written authorization will be at the user(s) sole risk and without liability to ARC TEC and ARC TEC's consultants. The user(s) possessing this documentation shall indemnify and hold harmless ARC TEC and ARC TEC's consultants and agents and employees from and against all claims, damages losses and expenses, including but not limited to attorneys' fees, arising out of unauthorized reuse of ARC TEC o r ARC TEC' s c o n s u l t a n t s i n s tr ume n t s o f s e r v i c e . Written dimensions on this drawing shall have precedence over any scaled dimension. DO NOT SCALE THIS DRAWING for accurate dimensions and notify ARC TEC of any discrepancies. © Copyright ARC TEC, Inc. 2021 In Association with: A R C T E C ARCHITECTURAL TECHNOLOGIES www.arctecinc.com Arizona 2960 East Northern Avenue, Building C Phoenix, AZ 85028 602.953.2355 California 1731 Technology Drive, Suite 750 San Jose, CA 95110 408.496.0676 225684.11 A Planning Applicationt For:
NAZARETH VISTA
606 - 616 SOUTH B STREET
SAN MATEO, CA 94401 03.26.2025 SB330 APPLICATION 04.30.2025 1ST PLANNING SUBMITTAL 08.11.2025 2ND PLANNING SUBMITTAL PA-2024-039 1 TRASH COLLECTION AREA, SEE DETAILS ON TR1.0 T0.1 FLOOR PLAN - LEVEL 01 STAGING AREA, DETAILS ON PAGE TR1.1 444 of 786 COMPACT / EV READY EV READY EV READY EV READY COMPACT / EV READY COMPACT / EV READY COMPACT COMPACT / EV READY COMPACT / EV READY COMPACT / EV READY COMPACT / EV READY COMPACT / EV READY COMPACT COMPACT / EV READY COMPACT / EV READY COMPACTCOMPACT EV READY EV READY EV READY EV READY EV READY EV READY EV READY EV READY DN 10% DN 18% NO PARKING STOP EV READY NO PARKING VAN COMPACT / EV READY COMPACT / EV READY EV READY COMPACT / EV READY EV READY A 1 B C D E F G H K 2452.2 2.5 C.1 2.73 B.3 B.5 J 1 A4.11 4.5 A.6 B.6 B.6 D.4 F.6 G.4 H.2 J.1 10'-11" 6'-1" 7'-6" 5'-6" 6'-1" 8'-11" 6'-0" 9'-0" 12'-6" 11'-4" 16'-2" 27'-6" 15'-4" 12'-2" 11'-10" 16'-8" 7'-3" 22'-3" 2'-11" 11'-1" 227'-0" 15'-11" 10'-7" 8'-1" 8'-2" 32'-0" 14'-9" 12'-3"
102'-11" 2 A4.11 ELEV 01 ## ELEV 02 ## UPDN STAIR #02 ## STAIR #01 ## UPDN RESIDENTIAL PARKING ## MOTORCYCLE PARKING R=33' R=35' R=33' R=35' R=33' R=35'
EV READY
COMPACT /
EV READY
COMPACT /
EV READY
COMPACT /
EV READY
COMPACT / EV READY
COMPACT /
EV READY
COMPACT /
EV READY
COMPACT /
UP
10%
UP
18% EV READY EV READY EV READY COMPACTCOMPACT COMPACTCOMPACT MOTORCYCLE PARKING SHAFT ##
EV READY
COMPACT / 8'-6" 8'-6" 8'-6" 8'-6" 8'-6" 8'-6" 8'-6" 8'-6" 8'-6" 8'-6" 8'-6" 8'-6" 8'-9" 8'-9" 8'-9" 8'-9" 8'-9" 9'-9" 9'-5" 10'-0" 18'-0"
8'-0" 8'-6" 8'-6" 8'-6" 8'-6"
8'-10" 9'-3" 8'-10" 9'-3" 5'-0" 9'-0" 8'-6" 8'-6" 8'-6" 8'-6" 8'-6" 8'-6" 8'-6" 8'-6" 8'-6" 18'-0" 18'-0" 24'-0" 18'-0" 12'-0" 5'-0" 8'-6" 8'-6" 8'-6" 8'-6" 8'-6" 17'-5" 17'-0" 8'-6" 8'-0" 8'-6"
8'-9" 8'-9"
18'-0" 18'-0"
24'-0" 8'-9" 8'-9" 8'-9" 8'-9" 8'-9" 8'-9" 8'-9" 8'-9" 9'-9" 24'-0" 24'-0"
27'-0" 22'-0" 24'-0" +14'-0" A.F.F. T.O. SLAB 32"
25'-0" 12'-0"
12'-0" R42'-0" R18'-0" R16'-8" 11'-0" 11'-0" A 1 B C D E F G H K 2452.2 2.5 C.1 2.73 B.3 B.5 J 1 A4.11 4.5 A.6 B.6 B.6 D.4 F.6 G.4 H.2 J.1 10'-11" 6'-1" 7'-6" 5'-6" 6'-1" 8'-11" 6'-0" 9'-0" 12'-6" 11'-4" 16'-2" 27'-6" 15'-4" 12'-2" 11'-10" 16'-8" 7'-3" 22'-3" 2'-11" 11'-1" 227'-0" 15'-11" 10'-7" 8'-1" 8'-2" 32'-0" 14'-9" 12'-3"
102'-11" 2 A4.11 ELEC. RM ## LARGE TRASH ## ELEVATOR LOBBY ## STAIR #01 ## ELEV 01 ## ELEV 02 ## HALLWAY ## UPDN UPDN STAIR #02 ## 74 S.F. PRIVATE BALCONY ## 88 S.F. PRIVATE BALCONY ## PRIVATE BALCONY ## 58 S.F. 74 S.F. PRIVATE PATIO ## 74 S.F. PRIVATE BALCONY ## 74 S.F. PRIVATE BALCONY ## 74 S.F. PRIVATE BALCONY ## 74 S.F. PRIVATE BALCONY ## 74 S.F. PRIVATE PATIO ## SHARED RESIDENTIAL OPEN AREA ## UNIT B1.0 1BR/ 1BA 820 S.F. UNIT B1.1 1BR/ 1BA 800 S.F. UNIT B1.4 1BR/ 1BA 832 S.F. UNIT C1.1 2BR/ 2BA 1,400 S.F. UNIT C1.0 2BR/ 2BA 1,308 S.F. UNIT B1.2 1BR/ 1BA 894 S.F. UNIT A1.2 (BMR - VLI) STUDIO 653 S.F. UNIT B1.3 1BR/ 1BA 747 S.F. UNIT B1.3 1BR/ 1BA 747 S.F. UNIT B1.3 (BMR - VLI) 1BR/ 1BA 747 S.F. UNIT A1.4 STUDIO 517 S.F. UNIT A1.3 STUDIO 468 S.F. UNIT A1.3 STUDIO 468 S.F. UNIT A1.3 STUDIO 468 S.F. COMMUNITY CENTER ## UNIT C1.3 2BR/ 1BA 1,223 S.F. UNIT C1.4 (BMR - VLI) 2BR/ 2BA 1,240 S.F. 74 S.F. PRIVATE PATIO ## 92 S.F. PRIVATE BALCONY ## SHAFT ## +34'-0" A.F.F. T.O. SLAB (2) 30"Ø CHUTES W/ 34"Ø ROUND FLOOR OPENING FOR CONCRETE FLOOR AND 34"x34" SQUARE FLOOR OPENING FOR WOODEN FLOORS (TYP). ADA FRONT APPROACH MASON BRA RED FLOOR MOUNT (2) SELF CLOSING, 15 x 18 BH AUTOMATIC OPENING DOOR, PER CBC ADA FRONT APPROACH R W PROJECT NO: DATE DESCRIPTION /Users/daisyurbina/Desktop/251014_ATM_161 S B- Street_San Mateo.dwg - Oct 15, 2025, 1:43pm - daisyurbina The "user(s)" in possession of this documentation acknowledge(s) that ARC TEC's and ARC TEC consultants' drawings, specifications, reports, electronic data and other documentation are instruments of service. ARC TEC and ARC TEC consultants shall be deemed the author and owner of such documentation. The "user(s)" in possession of this documentation shall not use or authorize any other person to use ARC TEC's or ARC TEC consultants' instruments of service. Reuse without ARC TEC's written authorization will be at the user(s) sole risk and without liability to ARC TEC and ARC TEC's consultants. The user(s) possessing this documentation shall indemnify and hold harmless ARC TEC and ARC TEC's consultants and agents and employees from and against all claims, damages losses and expenses, including but not limited to attorneys' fees, arising out of unauthorized reuse of ARC TEC o r ARC TEC' s c o n s u l t a n t s i n s tr ume n t s o f s e r v i c e . Written dimensions on this drawing shall have precedence over any scaled dimension. DO NOT SCALE THIS DRAWING for accurate dimensions and notify ARC TEC of any discrepancies. © Copyright ARC TEC, Inc. 2021 In Association with: A R C T E C ARCHITECTURAL TECHNOLOGIES www.arctecinc.com Arizona 2960 East Northern Avenue, Building C Phoenix, AZ 85028 602.953.2355 California 1731 Technology Drive, Suite 750 San Jose, CA 95110 408.496.0676 225684.11 A Planning Applicationt For:
NAZARETH VISTA
606 - 616 SOUTH B STREET
SAN MATEO, CA 94401 03.26.2025 SB330 APPLICATION 04.30.2025 1ST PLANNING SUBMITTAL 08.11.2025 2ND PLANNING SUBMITTAL PA-2024-039 1 CHUTE OPENING LEVEL 2 T0.2 FLOOR PLAN - LEVEL 02 & 04 REDUCED CHUTE VESTIBULE LEVEL 4 TRASH CLOSET LEVEL 4 445 of 786 OC 3CY FL COMPACTOR WASTE SPARE 3CY FL COMPACTOR RECYCLING SPARE 3CY FL COMPACTOR CONTAINER WASTE 4CY FL COMPACTOR REC 4CY FL COMPACTOR CONTAINER WASTE A1000 COMPACTOR LOOSE
2CY FL
COMPOST CHAIN LINK FENCE STS 500 SSL STS 500 SSL 3CY FL COMPACTOR CONTAINER RECYCLING MCP MCP AC (2) TOTAL STACKED POWER PACKS W/ DISCONNECTS A1000 COMPACTOR 2CY FL LOOSE COMPOST FD 16'-0" 8'-6" 18'-0" (2) 30"Ø CHUTES W/ 34"Ø ROUND FLOOR OPENING FOR CONCRETE FLOOR AND 34"x34" SQUARE FLOOR OPENING FOR WOODEN FLOORS (TYP). ADA FRONT APPROACH MASON BRA RED FLOOR MOUNT (2) SELF CLOSING, 15 x 18 BH AUTOMATIC OPENING DOOR, PER CBC ADA FRONT APPROACH R W PROJECT NO: DATE DESCRIPTION /Users/daisyurbina/Desktop/251014_ATM_161 S B- Street_San Mateo.dwg - Oct 15, 2025, 1:43pm - daisyurbina The "user(s)" in possession of this documentation acknowledge(s) that ARC TEC's and ARC TEC consultants' drawings, specifications, reports, electronic data and other documentation are instruments of service. ARC TEC and ARC TEC consultants shall be deemed the author and owner of such documentation. The "user(s)" in possession of this documentation shall not use or authorize any other person to use ARC TEC's or ARC TEC consultants' instruments of service. Reuse without ARC TEC's written authorization will be at the user(s) sole risk and without liability to ARC TEC and ARC TEC's consultants. The user(s) possessing this documentation shall indemnify and hold harmless ARC TEC and ARC TEC's consultants and agents and employees from and against all claims, damages losses and expenses, including but not limited to attorneys' fees, arising out of unauthorized reuse of ARC TEC o r ARC TEC' s c o n s u l t a n t s i n s tr ume n t s o f s e r v i c e . Written dimensions on this drawing shall have precedence over any scaled dimension. DO NOT SCALE THIS DRAWING for accurate dimensions and notify ARC TEC of any discrepancies. © Copyright ARC TEC, Inc. 2021 In Association with: A R C T E C ARCHITECTURAL TECHNOLOGIES www.arctecinc.com Arizona 2960 East Northern Avenue, Building C Phoenix, AZ 85028 602.953.2355 California 1731 Technology Drive, Suite 750 San Jose, CA 95110 408.496.0676 225684.11 A Planning Applicationt For:
NAZARETH VISTA
606 - 616 SOUTH B STREET
SAN MATEO, CA 94401 03.26.2025 SB330 APPLICATION 04.30.2025 1ST PLANNING SUBMITTAL 08.11.2025 2ND PLANNING SUBMITTAL PA-2024-039 1 RESIDENTIAL & RETAIL TRASH ROOM PLAN LEVEL 1 SHEET NOTES: RESIDENTIAL TRASH ROOM. LEVEL 1 1. TRASH COLLECTION ROOM IS 2HR FIRE-RATED - RESTRICTED ACCESS. 2. FLOOR SHALL BE FINISHED WITH WATERPROOF DECK COATING. FLOOR TO HAVE MINIMAL SLOPE (1° MAX) AND FLOOR DRAIN. FLOOR LEVEL UNDER COMPACTORS. 3. WALLS SHALL BE FINISHED WITH WASHABLE WATERPROOF SURFACE SUCH AS FRP OR HIGH-GLOSS ENAMEL PAINT 8'-0" AFF. 4. WALL PROTECTION: 12"HX6"W CONCRETE CURB AT BASE OF WALLS PER PLAN. INSTALL 18" THICK STEEL DIAMOND TREAD BACKING 6'-0" AFF ALONG WALL AT G.L. D PER PLAN. 5. ROOM SHALL BE MECHANICALLY VENTILATED WITH (1) CFM/SF PER 2022 CBC. 6. INSTALL 8'-0" WIDE ROLL-UP DOOR FOR TRANSFERRING CONTAINERS. INSTALL 3'-0" NFPA COMPLIANT DOOR FOR FIRE EGRESS. 7. (2) 30"Ø 16G GALVANIZED STEEL CHUTES WITH APOLLO MODEL A500 SINGLE-SIDE LATCH COMPACTORS AND 3CY FL COMPACTOR CONTAINERS FOR WASTE AND RECYCLING. CHUTES TERMINATE 5'-9" AFF. 8. PP: COMPACTOR POWER PACKS SHALL BE FLOOR-MOUNTED AND STACKED VERTICALLY. (2) 5HP 3-PHASE, 208/230/460V. (2) 30A DISCONNECTS 60" AFF. 9. MCP: CHUTE MASTER CONTROL PANEL SHALL BE WALL-MOUNTED 60" AFF. MUST ALLOW LOCK DOWN OF CHUTE INTAKES FOR EXCHANGING CONTAINERS AND WASHING CHUTES. (2) TOTAL. 120V 15A SERVICE OUTLET REQUIRED. 10. AC: AIR COMPRESSOR (OIL LESS) 4610AC WITH AUTOMATIC TANK DRAIN VALVE. 2 HP PEAK, TWIN TANK CAPACITY 4.6 GALLONS, VOLTAGE @ 60 HZ 110 VOLTS, CURRENT 8.5 AMPS TO POWER THE CHUTE INTAKE DOORS. (1) TOTAL. 11. OC: ODOR CONTROL UNIT SHALL BE WALL-MOUNTED 60" AFF. 120V 15A SERVICE OUTLETS REQUIRED. 12. HB: HOT AND COLD HOSE BIBB SHALL BE WALL-MOUNTED 60" AFF. 13. PROVIDE WPT45 27" X 48" ELECTRIC PALLET TRUCK FOR TRANSFERRING CONTAINERS. 4500LB CAPACITY WITH 57.5" TURNING RADIUS. 120V 15A SERVICE OUTLETS REQUIRED. 14. PROVIDE (1) UNDEDICATED 120V 15A SERVICE OUTLET REQUIRED FOR STAFF MAINTENANCE PURPOSE. 15. CHUTE DISCHARGE DOORS: WILKINSON TYPE-A, B-LABEL CONSTRUCTION 90 MINUTE FIRE-RATED, HORIZONTALLY ROLLING DOOR, HELD OPEN BY 165°F FUSIBLE LINK, SHOWN IN CLOSED POSITION. CHUTE INTAKE VESTIBULES. SIM AT LEVELS 2-5. 16. CHUTE INTAKE VESTIBULES SHALL BE 2HR FIRE-RATED WITH 2HR FIRE-RATED ACCESS DOOR FOR RESIDENTIAL ACCESS. 5'-0" MIN DIAMETER WHEELCHAIR TURNING SPACE REQUIRED PER ADA REQUIREMENTS. POWER TO INTAKE DOORS SUPPLIED BY MCP. PROVIDE (2) 15X18 BOTTOM HINGED, NORMALLY CLOSED LOW-VOLTAGE, ELECTRICALLY INTERLOCKED, AUTOMATIC OPENING DOORS FOR WASTE AND RECYCLING AT EACH FLOOR. SEE DETAIL 1/TR2.0. 30" X 48" FRONT APPROACH REQUIRED PER ADA STANDARDS. MANAGEMENT TO PROVIDE 23-GALLON 'RUBBERMAID SLIM JIM' OR EQUIVALENT CONTAINER FOR COMPOST DISPOSAL. STAFF TO EMPTY IN TOTERS DAILY AT TRASH ROOM. 17. 2HR FIRE-RATED FACE WALL SHALL NOT BE ERECTED UNTIL CHUTES HAVE BEEN INSTALLED. FOR SOUND PROOFING PURPOSES, DOUBLE STUD-WALLS ARE REQUIRED ADJACENT TO OCCUPIED SPACES. INTERIOR OF SHAFT SHALL BE TAPED TO PREVENT ODOROUS AIR LEAKING INTO OCCUPIED SPACES. 18. PROVIDE ROUND FLOOR OPENINGS AT CONCRETE FLOORS AND SQUARED FLOOR OPENINGS AT WOOD-FRAME CONSTRUCTION. SEE PLAN FOR DIAMETER OF OPENINGS. INSTALL FLOOR SUPPORT FRAME AT EACH FLOOR PENETRATION TO SECURE CHUTE. SEE DETAIL 9/TR2.0 FOR ANCHORING. POUR RINGS WILL VARY BASED ON THICKNESS OF FLOOR SLAB - PROVIDED BY MANUFACTURER. GENERAL NOTES. 1. ANY DESIGNS OR SOLUTIONS SHOWN IN DRAWING, EITHER DIRECT OR IMPLIED, ARE HEREBY CLARIFIED AS EXAMPLES AND SHALL NOT BE CONSIDERED COMPLETE DESIGNS FOR CONSTRUCTION. THESE DRAWINGS ARE INTENDED TO SUPPLEMENT THE SUBMITTAL PACKAGE FROM ARCHITECT. 2. ANY PARTIAL INFORMATION, OMISSIONS, OR INACCURATE DESCRIPTIONS OF WORK SHOWN IN DRAWINGS, WHICH ARE NECESSARY TO PERFORM THE SCOPE OF WORK, SHALL NOT RELIEVE THE CONTRACTOR FROM COMPLETION OF WORK. ALL WORK SHALL BE PERFORMED TO SATISFY THE MINIMUM REQUIREMENTS OF THE CURRENT APPLICABLE BUILDING CODES. 3. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AND CONDITIONS PRIOR TO START OF CONSTRUCTION. THE ARCHITECT SHALL BE PROMPTLY NOTIFIED OF ANY INCONSISTENCIES AND/OR DISCREPANCIES. SCALE: 1/2" = 1'-0" CHUTE SHAFT AT LEVEL 2 SCALE: 1/2" = 1'-0" T1.0 TRASH COLLECTION AREA SCALE: 1/2" = 1'-0" CHUTE VESTIBULE AT LEVEL 4 PROJECTED COLLECTION SCHEDULE: RESI TRASH ROOM WASTE COMPOST SERVICE: CONTAINER VOL / TYPE: FREQUENCY: (1) 3CY FL COMPACTED CONTAINER 2x/wk (1) 2CY COMPOST 2x/wk RECYCLING (1) 3CY FL COMPACTED CONTAINERS 3x/wk PROJECTED COLLECTION SCHEDULE: RETAIL TRASH ROOM WASTE COMPOST SERVICE: CONTAINER VOL / TYPE: FREQUENCY: (1) 4CY FL COMPACTED CONTAINER 2x/wk (1) 2CY COMPOST 2x/wk RECYCLING (1) 4CY FL COMPACTED CONTAINERS 2x/wk 446 of 786 GENERATOR ## ELECTRICAL STAIR #02 ## 2'-11" 11'-1"
6 T H A V E N U E 6'-8"
36'-0" 65'-0"
21'-6" GENERATOR ## STAIR #02 ## 2'-11" 11'-1"
6 T H A V E N U E 9'-0" 9'-0"
36'-0" 65'-0"
21'-6" PROJECT NO: DATE DESCRIPTION
/Users/daisyurbina/Desktop/251014_ATM_161 S B- Street_San Mateo.dwg - Oct 15, 2025, 1:43pm - daisyurbina The "user(s)" in possession of this documentation acknowledge(s) that ARC TEC's and ARC TEC consultants' drawings, specifications, reports, electronic data and other documentation are instruments of service. ARC TEC and ARC TEC consultants shall be deemed the author and owner of suchdocumentation. The "user(s)" in possession of this documentation shall not use or authorize any other person to use ARC TEC's or ARC TEC consultants' instruments of service. Reuse without ARC TEC's written authorization will beat the user(s) sole risk and without liability to ARC TEC and ARC TEC's consultants. The user(s) possessing this documentation shall indemnify and hold harmless ARC TEC and ARC TEC's consultants and agents and employees from and against all claims, damages losses and expenses, including but not limited to attorneys' fees, arising out of unauthorized reuse of ARC TEC o r ARC TEC' s c o n s u l t a n t s i n s tr ume n t s o f s e r v i c e . Written dimensions on this drawing shall have precedence over any scaled dimension. DO NOT SCALE THIS DRAWING for accurate dimensions and notify ARC TEC of any discrepancies. © Copyright ARC TEC, Inc. 2021 In Association with: A R C T E C ARCHITECTURAL TECHNOLOGIES www.arctecinc.com Arizona 2960 East Northern Avenue, Building C Phoenix, AZ 85028 602.953.2355 California 1731 Technology Drive, Suite 750 San Jose, CA 95110 408.496.0676 225684.11 A Planning Applicationt For:
NAZARETH VISTA
606 - 616 SOUTH B STREET
SAN MATEO, CA 94401 03.26.2025 SB330 APPLICATION 04.30.2025 1ST PLANNING SUBMITTAL 08.11.2025 2ND PLANNING SUBMITTAL PA-2024-039 1 STAGING AREA- OPTION 1 SCALE: 3/16" = 1'-0" TR1.1 STAGING AREA STAGING AREA- OPTION 2 SCALE: 3/16" = 1'-0" 447 of 786 ELEC. RM ## LARGE TRASH ## ELEVATOR LOBBY ## ## ## UNIT C1.0 2BR/ 2BA 1,308 S.F. +34'-0" A.F.F. T.O. SLAB PROJECT NO: DATE DESCRIPTION /Users/daisyurbina/Desktop/251014_ATM_161 S B- Street_San Mateo.dwg - Oct 15, 2025, 1:44pm - daisyurbina The "user(s)" in possession of this documentation acknowledge(s) that ARC TEC's and ARC TEC consultants' drawings, specifications, reports, electronic data and other documentation are instruments of service. ARC TEC and ARC TEC consultants shall be deemed the author and owner of such documentation. The "user(s)" in possession of this documentation shall not use or authorize any other person to use ARC TEC's or ARC TEC consultants' instruments of service. Reuse without ARC TEC's written authorization will be at the user(s) sole risk and without liability to ARC TEC and ARC TEC's consultants. The user(s) possessing this documentation shall indemnify and hold harmless ARC TEC and ARC TEC's consultants and agents and employees from and against all claims, damages losses and expenses, including but not limited to attorneys' fees, arising out of unauthorized reuse of ARC TEC o r ARC TEC' s c o n s u l t a n t s i n s tr ume n t s o f s e r v i c e . Written dimensions on this drawing shall have precedence over any scaled dimension. DO NOT SCALE THIS DRAWING for accurate dimensions and notify ARC TEC of any discrepancies. © Copyright ARC TEC, Inc. 2021 In Association with: A R C T E C ARCHITECTURAL TECHNOLOGIES www.arctecinc.com Arizona 2960 East Northern Avenue, Building C Phoenix, AZ 85028 602.953.2355 California 1731 Technology Drive, Suite 750 San Jose, CA 95110 408.496.0676 225684.11 A Planning Applicationt For:
NAZARETH VISTA
606 - 616 SOUTH B STREET
SAN MATEO, CA 94401 03.26.2025 SB330 APPLICATION 04.30.2025 1ST PLANNING SUBMITTAL 08.11.2025 2ND PLANNING SUBMITTAL PA-2024-039 1 TRASH CLOSET SCALE: 1/2" = 1'-0" T1.2 TRASH CLOSET SLIM JIM FOR COMPOST 448 of 786
MIXED-USE DATA FORM
NAME:
616 S. B St., Nazareth Vista
SPAR + SPDA +Tent. Parcel Map
PA:
PA-2025-03
ADDRESS:
616 S. B Street
LOT AREA:
27,921 sq. ft. (0.64 acres)
ZONING:
C1-3/R5
LAND USE: Mixed-Use Medium II
APNs:
034194030, 034194140
PROPOSED MAXIMUM ALLOWED
FLOOR AREA
Level 1-3 (Commercial &
Parking)
Leve 4-8 (Residential)
TOTAL:
74,076 sq.ft
88,043 sq.ft.
162,119 sq. ft. 111,684 sq. ft.
F.A.R.: 5.81 4.0
RESIDENTIAL DENSITY:
Density
# of Units
147 units/acre2
94 units
99 units/acre
64 units/ acre
RESIDENTIAL UNIT MIX:
Studio
1 Bedroom
2 Bedrooms
42 units
41 units
11 units
-
-
-
BLDG. HEIGHT: 84’10” to top plate
90’10” to parapet screen
-
STORIES 8 6
PROPOSED MINIMUM REQUIRED:
SETBACKS:
S. B Street:
6 th Avenue:
7 th Avenue:
Rear:
0’- 0”
20’- 0”
0’- 0”3
0’- 0’3
0’- 0”
20’- 0”
20’- 0”
15’- 0”
PARKING:
Residential:
Commercial:
TOTAL:
93 stalls4
21 stalls4
114 stalls4
0 0
0 BICYCLE PARKING:
Residential:
Commercial:
TOTAL:
Short-Term
6 4
10 spaces
Long-Term
97 1
98 spaces
Short-Term
6 4
10 spaces
Long-Term
97 1
98 spaces
OPEN SPACE:
Private:
Common:
6,553 sq. ft.
5,378 sq. ft.
4,320 sq. ft.
4,800 sq. ft.
1 The project requests a waiver to exceed floor area limits pursuant to State Density Bonus law. 2 The project includes a density bonus request under State Law to increase the allowable density by 50% of the base density. 3 The project requests a waiver to reduce required yards along 7th Ave and the rear of the building pursuant to State Density Bonus law.
4 The Project is exempt from minimum parking standards under State Law (AB2097). 449 of 786
c
TEN ALMADEN BOULEVARD
ELEVENTH FLOOR
SAN JOSE, CALIFORNIA 95113-2233
TELEPHONE: (408) 286-5800
FACSIMILE: (408) 998-5388
www.berliner.com Branch Offices
Merced, CA • Modesto, CA
____________ ____________
FOUNDERS
SANFORD A. BERLINER (d. 2020)
SAMUEL J. COHEN
OF COUNSEL
STEVEN L. HALLGRIMSON
PEGGY L. SPRINGGAY
FRANK R. UBHAUS
NANCY J. JOHNSON
JEROLD A. REITON
MICHAEL B. IJAMS
NANCY L. BRANDT
BRADLEY HEBERT
FRED A. SILVA
March 26, 2026
Elizabeth Gagliardi, Planner
City of San Mateo Community
Development Department
330 West 20th Avenue
San Mateo, CA 94403
Re: Nazareth Vista LLC Mixed-Use Development Project
616 South B Street - APNs 034-194-030, 034-194-140
Density Bonus Request Letter
Dear Ms. Gagliardi:
This letter is on behalf of applicant Nazareth Vista LLC (“Applicant”) in support of their entitlement application for a housing development project on 616 South B Street, San Mateo, CA 94403 (“Project”). This letter addresses the Project’s density bonus, parking ratio, and several waivers that are being requested by the Applicant for the Project in support of the current permit application.
Project Overview
The Project consists of the construction of an 8-story, 162,119 square foot, mixed-use building, including 94 multi-family residential units, 7,286 square feet of commercial space, 117 vehicle parking spaces and 98 long-term bicycle parking spaces. The Project places the commercial retail space and parking garage on the first floor, parking garages on the second and third floors, and residential units on the remaining floors. The Project will also provide site improvements to ANDREW L. FABER
JAMES P. CASHMAN
JONATHAN D. WOLF
KEVIN F. KELLEY
MARK MAKIEWICZ
JOLIE HOUSTON
BRIAN L. SHETLER
HARRY A. LOPEZ
CHARLES W. VOLPE
CHRISTINE H. LONG
AARON M. VALENTI
CHRISTIAN E. PICONE
SUSAN E. BISHOP
SANDRA G. SEPÚLVEDA
KIMBERLY G. FLORES
DAWN C. SWEATT
TYLER A. SHEWEY
JAMES F. LANDRUM, JR.
MICHAEL J. CHENG
EILEEN P. KENNEDY
JOSHUA BORGER
BENJAMIN M. JOHNSON
STEPHEN C. SCORDELIS
C. DAVID SPENCE
BRANDON L. REBBOAH
TIMOTHY K. BOONE
STUART B. SPENCER
WENDY C. KROG
BLAINE R. COX
DAVID A. BELLUMORI
ERIC D. CAPRON
CRAIG A. TANABE
ALEXANDRIA N. NGUYEN
MONICA S. HAMMER
LEILA N. SOCKOLOV
ALAN LAW
ANGELA SHAW
SADIYA S. AHMED
NATHAN C. BRADY
GIULIANA R. FERRANTE
LINDSAY I. WALCZAK
MAKAYLA A. WHITNEY
JACE D. LYNCH
MARISA J. MARTINSON
MARIA I. PALOMARES
KEVIN S. LANDIS
OMEED RAJAEE
TIFFANY A. SCOGGIN
CHRISTIAN D. WICK
VEENA A. BANSAL
YAO VANG
JOSEPH H. FELDMAN
MATTHEW C. TOSCANO
JEANETTE MARTINEZ
ISAAC D. NIEBLAS
ROBERT AVERSA-GOODMAN
SHANY KLEIN
MILAN NEDA
KIM G. DESCAMPS
MORGAN H. WAHLER
JUSTIN D. GAZZANIGA
JOSEPH C. FORGATCH
GARRETT D. BERGTHOLD
TONY INFANTE
IAN M. DURUPT
RAMSIN YOUKANA
ADAM M. CARDOSO
EDUARDO FLORESCOVARRUBIAS
RACHEL M. HICKINGBOTTOM
450 of 786
Elizabeth Gagliardi, Planner
March 26, 2026
-2-
enhance pedestrian and bicycle accessibility, such as new sidewalks, curb and gutter enhancements, bicycle racks, and street trees.
Of the 94 residential units, 10 units would be designated as affordable to Very Low-Income households, including six studio units, three 1-bedroom units and one 2-bedroom unit. The residential units include studio apartments (42 units), 1-bedroom apartments (41 units) and 2- bedroom apartments (11 units). The affordable units are distributed evenly across the four residential floors and three-unit types. The Project site is 0.64 acres, resulting in a project density of 150 dwelling units/acre.
The Project site General Plan designation is Mixed-Use Medium II, which allows a residential density of 51-99 dwelling units/acre and a building height of 4-6 stories. Mixed-use development is supported by this designation. The site is zoned C1-3/R-5. Adjacent zonings are C1-3/R-5 (NE and SE), R6-D (SW), and CBD/R (NW). The R6-D zoned parcel is adjoining while the other zoned parcels are separated by intervening streets.
For Density Bonus calculations, it is important to note that per the Government Code Section 65915(f)(5), all numbers shall be rounded up to the nearest whole number. Also, the percentage of affordable units is to be calculated based on the proposed density prior to application of a Density Bonus per Section 65915(b) (1), which reads in part: “A city, county, or city and county shall grant one density bonus, the amount of which shall be as specified in subdivision (f)… if an applicant for a housing development seeks and agrees to construct a housing development, excluding any units permitted by the density bonus awarded pursuant to this section…”.
The base density for the Project site is 64 dwelling units. Ten Very Low-Income units represents 16% of the base density, thereby qualifying the Project for a 50% density bonus, or a total of 94 residential units. Accordingly, the Project also qualifies for waivers or reductions of development standards as necessary to utilize the density bonus and for concessions/incentives if needed to make the project feasible. The Project is eligible for three concessions/incentives, pursuant to Government Code Section 65915(d)(2)(C). At this time, the Project proposes use of one concession/incentive, and further the Applicant reserves the right to modify the Project to take advantage of additional concessions/incentives, if necessary or appropriate. Finally, the Applicant requires several waivers as outlined below.
Parking
The Project also incorporates the parking ratios set forth in Government Code Section 65915(p)(2)(A). Government Code Section 65915(p)(2)(A) provides that a housing development with at least 11% Very Low-Income units that is also one-half mile from a major transit stop to have a parking ratio that does not exceed 0.5 spaces per housing unit. Because 15% of the base units of the Project are designated as Very Low Income, and the Project is approximately 0.4 miles from the San Mateo Station serviced by Caltrain, the Project will be entitled to a parking ratio that does not exceed 0.5 spaces per housing unit. Therefore, the Project is required to provide a minimum of 47 spaces to support the proposed residential uses. 451 of 786
Elizabeth Gagliardi, Planner
March 26, 2026
-3-
The Project will have 96 residential parking spaces, exceeding the minimum parking requirement of 47 spaces. The Project will have an additional 21 spaces dedicated for visitor and retail parking, satisfying the requirement for 14 retail/visitor parking spots (1.9/1000). Thus, the Project satisfies both the residential and commercial parking minimums.
Waivers
Government Code Section 65915(e) states that the City shall waive any applicable development standard that would have the effect of physically precluding the Project unless the local agency finds that the waiver would (1) violate state or federal law; or (2) have a significant and unmitigable impact on public health or safety, as defined in Government Code 65589.5(d)(2).
The standard for considering waiver requests was interpreted by the court recently in Bankers Hill 150 v. City of San Diego (2022) 74 Cal.App.5th 755 (“Bankers Hill”). In Bankers Hill, neighborhood groups challenged a height waiver for a project that was granted by the City of San Diego, because they claimed that the project could have been redesigned to avoid the need for a height waiver. The court found that the city lacked discretion to deny a height waiver because once the applicant had “established its eligibility for the density bonus . . . , it was entitled to a waiver of any development standards that would preclude construction” of the proposed project unless the city could make findings of a specific, adverse impact on public health or safety, or unless granting the waiver would violate state or federal law (Bankers Hill, p. 774).
As a result, the Applicant has the initial burden of justifying a waiver by showing that under Government Code Section 65915, the Project qualifies for the density proposed, and that the Project cannot be constructed as proposed unless the waiver is granted. If the Applicant meets this burden, the burden shifts to the City to identify a significant, adverse impact on public health or safety, or a violation of federal law. The Applicant is not required to consider or propose alternative projects that attempt to achieve the same density without the waivers sought.
As outlined in the Project Overview above, the Project qualifies for a density bonus with a maximum density of 94 units. The Applicant has designed the Project with 94 units. The development standards discussed below would physically preclude construction of the Project.
Thus, the Project is entitled to be granted the below waivers from standards unless the City makes a finding for denial as described above. The Applicant is unaware of any circumstances that would justify finding for denial.
Building Height
San Mateo Municipal Code (SMMC) Section 27.30/055 establishes a maximum allowed height for the Project site through reference to the General Plan. As stated in the General Plan, the maximum height for the property is 6 stories. The Project is 8-stories in height. Reducing the height of the Project to 6 stories would significantly reduce the number of residential units as well as affordable units in the Project. The Applicant asks that the City grant a waiver to this height requirement to allow the Project to be constructed as designed at the proposed density. 452 of 786
Elizabeth Gagliardi, Planner
March 26, 2026
-4-
Setback Requirements
For mixed-use projects, SMMC Section 27.29.116 states that setbacks are determined by the underlying zoning district, which in this case is the C1-3 district. SMMC Section 27.30.060 identifies required setbacks for parcels adjoining residential parcels. As the Project is located on a parcel adjoining residential use, per this Section, the Project is required to provide a rear yard setback equivalent to the side yard of the adjoining R6-D parcel. The Project would thus be required to provide a 15-foot rear setback per SMMC Section 27.28.086. For parcels that front on to a street with a district with at least 80% residential use across the street must similarly provide a front setback equivalent to that required for the opposing residential district. In this case the Project’s 7th Avenue frontage is required to provide a 20-foot setback.
The Applicant requests a waiver to the 20-foot setback requirement along 7th Avenue per SMMC Section 27.28.084. The Project currently has no setback along 7th Avenue, so enforcing the 20-foot setback requirement would preclude the Project from being constructed as designed at the proposed density. Adding a 20-foot setback would result in reducing the building’s footprint and as a result, losing affordable residential units. Because the Project has qualified for a density bonus, the Applicant cannot be required to redesign the Project under Bankers Hill. The Applicant asks that the City grant a waiver to this setback requirement to allow the Project to be constructed as designed at the proposed density.
The Applicant requests an additional waiver to the 15-foot rear setback per SMMC Section
27.28.086. The Project currently has no rear setback, so complying with this setback requirement would significantly decrease the building’s footprint and reduce the number of affordable units the Project can provide. Because the Project has qualified for a density bonus, and this setback requirement would also prohibit the Project from being constructed as designed at the proposed density, the Applicant asks that the City also waive this setback requirement pursuant to the holding in Bankers Hill.
Floor Area Ratio/Density
The Applicant requests a waiver to the floor area ratio limit (FAR) applicable to the Project.
The Project is in a C1-3/R5 district, which has a FAR of 3.0 pursuant to SMMC Sections
27.26.050, 27.28.050, 27.29.110, and 27.30.050. The Project is on a 27,921 sq/ft lot and has a total floor area of 109,219 sq/ft. Consequently, the Project has a FAR of 3.6. If the Project was required to comply with a FAR of 3.0, then it would be required to reduce its total floor area to 83,763 sq/ft.
This would result in eliminating housing units from the Project and reducing the total number of affordable housing units. The R5 overlay limits the maximum residential density to 50 dwelling units/acre. A waiver from this limitation is necessary to utilize the density bonus as discussed above.
Vertical Wall Plan Breaks (ODS 4.1.7.B.2)
The City’s Objective Design Standards (Objective Standards) include several provisions applicable to the Project identified as High Rise Standards. The Project conforms to most of these but would not fully conform to the Vertical Wall Plan Breaks requirement. The Objective Standards requires three out of four criteria to be met, but the Project only meets two of the criteria. 453 of 786
Elizabeth Gagliardi, Planner
March 26, 2026
-5-
The Project is able to meet the two criteria that pertain to architectural treatment (roof cornice and material changes), but not able to meet either of the remaining two, both of which require a stepback that would reduce the building square footage. Accordingly, incorporation of such a stepback would reduce the number of units that could be placed within the building and would therefore be inconsistent with use of the Density Bonus Law.
Shadow Requirements (ODS 5.1.2)
“Fifty (50) percent of required open space shall be unshaded between the hours of 12:00 p.m. to 2:00 p.m. at the spring and fall equinox. This standard shall not apply where the open space is already shaded by an existing building and no other opportunities for access to sublight exist on the site.” As designed, the Project open space would be 13% unshaded during this timeframe.
Increasing the unshaded are to 50% would require a significant reduction in building height such that the Project would lose the units provided through the Density Bonus Law.
Loading Zone
The project will not conform to two of the City’s standards for loading zone. The City normally requires a 10’ width for a loading space and the project provides a 9’ wide space. Additionally, the loading space does not meet the City’s standard of a 50-foot separation from the nearest street intersection. It would not be feasible for the project to be modified to meet these requirements without the loss of residential units and/or the parking that is provided as an amenity for those units. Accordingly, the applicant is requesting waivers from these standards.
Objective Design Standard 7.1.2.F
ODS7.1.2.F requires that three architectural façade design features (cornices, cornices above second floor awnings, and windowsills) be placed at the same height as on adjacent buildings. This would only be possible with changes to the height of each floor within the building and would result in the loss of residential units and/or parking due to a less efficient design.
Concessions/Incentives
Pursuant to Government Code Section 65915(d)(2)(C), the Project is entitled to three Concessions/Incentives, independent of any Waivers granted to the Project. In the case of Concessions/Incentives, the City has the obligation to demonstrate that the Concession/Incentive would either not result in a cost reduction for the applicant, have an adverse effect on the public welfare, or be contrary to State Law.
The Applicant requests that the Project be granted a Concession/Incentive for relief from Mixed-Use Section 7.1.2 (A, B, and C) of the Multi-family and Mixed-Use Objective Design Standards (Mixed-Use Standards). Section 7.1.2 of the Mixed-Use Standards requires that new development in the Downtown area implement a Spanish Colonial Revival architectural style.
While the Project conforms to some of the criteria in the Mixed-Use Standard, it does not fully conform to the following: Required Architectural Elements; and Additional Architectural Elements. (Note that the Project would also not conform to the Building Façade Materials and Colors standard, but conformance to this standard is optional given that the Project otherwise conforms to the Mixed-Use Standard 4.1.)
454 of 786
Elizabeth Gagliardi, Planner
March 26, 2026
-6-
Full adherence to the requirements set forth in the Mixed-Use Standards would impose additional costs on the Project in the form of expensive architectural features and details inconsistent and incompatible with the proposed height and density for the Project. Adding architectural elements such as historic ornamentation, elaborate chimneys, decorative tiles or extra deep recessed windows would increase both construction and maintenance costs, as well as be inappropriate for use on the proposed 8-story building, as they are associated with lower density forms of development. In some cases, qualifying elements for this standard (e.g., low-pitched roof, round or square towers, and deep recessed windows) would require a reduction of habitable building area, thereby also undermining use of the density bonus. Granting this Concession/Incentive will result in cost savings for the Project while not endangering the public welfare or being contrary to state law; the Project therefore is entitled to this Concession/Incentive.