4 1
8 5
ENVIRONMENTAL IMPACT
There is no environmental impact associated with this action. The project will assess the environmental impact for compliance with the California Environmental Quality Act (CEQA).
FISCAL IMPACT
Approval of the requested Appropriation Adjustment will recognize Traffic System Management Grant funds in the amount of $450,000 in the State Grant-Direct, revenue account (No. 14817002-52025) and appropriate the same amount to the Active Transportation Program, Improvements Other than Buildings expenditure account (No. 14817613-66220).
With the approval of the amendment to the FY 2023-24 Capital Improvement Program, funds will be assigned, budgeted, and available for expenditure in FY 2023-24. Future phases of these projects will be budgeted in future Capital Improvement Programs.
The following table summarizes the funds budgeted and available for expenditure to deliver this project.
Fiscal
Year
Accounting Unit
- Account No.
(Project No.)
Fund
Description
Accounting Unit,
Account No.
Description
Amount
2023-24 14817613-66220
(23-6029)
Traffic
System
Management
Grant
Active Transportation
Program, Improvements
Other Than Buildings
$450,000
Total $450,000
EXHIBIT(S)
1. Conceptual Plan
2. Location Map
3. CIP Sheet Project 23-6029
4. Program Supplement Agreement No. A456
Submitted By: Nabil Saba, P.E., Executive Director – Public Works Agency Approved By: Alvaro Nuñez, Acting City Manager
City Council
12 –
2 4/16/2024
City of Santa Ana - Memory Lane and Flower Street Bikeway Attachment D - Page 1
ALL PROPOSED WORK WITHIN EXISTING PUBLIC RIGHT-OF-WAY
EXHIBIT 1
City Council
12 –
3 4/16/2024
City of Santa Ana - Memory Lane and Flower Street Bikeway Attachment D - Page 2
PROPOSED BULB-OUTS
TO SHORTEN CROSSING
ALL PROPOSED WORK WITHIN EXISTING PUBLIC RIGHT-OF-WAY
City Council
12 –
4 4/16/2024
City of Santa Ana - Memory Lane and Flower Street Bikeway Attachment D - Page 3
PROPOSED RAISED
CROSSWALK WITH
RRFB'S
PROPOSED BULB-OUTS
TO SHORTEN CROSSING
ALL PROPOSED WORK WITHIN EXISTING PUBLIC RIGHT-OF-WAY
City Council
12 –
5 4/16/2024
.
625 feet
MEMORY LANE AND FLOWER STREET BIKEWAY
EXHIBIT 2
PROJECT
LIMITS
Memory Lane
Flower St
Bristol St
The City Drive
PROJECT
LIMITS
City Council
12 –
6 4/16/2024
CITY OF SANTA ANA FY 23/24CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
PROJECT DESCRIPTION:
Construction of bikeway, ADA compliant sidewalks, curb ramps, bulb-outs (curb extensions), raised medians/crosswalks, traffic signal modification and channelization on Memory Lane and Flower Street.
PROJECT NEED:
The City of Santa Ana and City of Orange designed to increase bicyclist and pedestrian safety and mobility.
PROJECT TITLE:
Memory Lane and Flower Street
Bikeway
PROJECT CATEGORY:
Traffic Improvements
Street/Bridge Improvements &
Widening
LOCATION MAP
AGENCY: DIVISION: CONTACT: DATE:
Public Works CIP Engineering Gilbert Castillo, Senior Engineer 16-Apr-2024 PROJECT COSTS FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 Engineering 450,000 - - - - - -
TOTAL 450,000 - - - - - -
SOURCE OF FUNDS FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 ATP 450,000 - - - - - -
TOTAL 450,000 - - - - - -
EXHIBIT 3
City Council
12 –
7 4/16/2024
EXHIBIT 4
City Council
12 –
8 4/16/2024
City Council
12 –
9 4/16/2024
Public Works Agency
www.santa-ana.org/public-works
Item # 13
City of Santa Ana
20 Civic Center Plaza, Santa Ana, CA 92701
Staff Report
April 16, 2024
TOPIC: Clean California Bus Stop Improvement Project
AGENDA TITLE
Appropriation Adjustment and Capital Improvement Project Amendment for the Bus Stop Improvement Project (Project No. 24-6985) (Non-General Fund)
RECOMMENDED ACTION
1.Approve an appropriation adjustment recognizing $398,000 in Clean California Local Grant Program grant funds in the Select Street Construction, State Grant-Direct revenue account, and appropriate the same amount into the Select Street Construction, Improvements Other than Buildings expenditure account. (Requires five affirmative votes)
2.Approve an amendment to the Fiscal Year 2023-24 Capital Improvement Project to include $398,000 of funding to the Bus Stop Improvement Project (Project No. 24- 6985).
GOVERNMENT CODE §84308 APPLIES: No
DISCUSSION
The Clean California Local Grant Program (CCLGP) is a competitive statewide program created to beautify and clean local streets and roads, tribal lands, parks, pathways, transit centers, and other public spaces. A total amount of $114.5 million was made available statewide for projects that reduce waste and debris, install measures to beautify and improve public spaces and mitigate the urban heat island effect, improve public spaces for walking and recreation, and advance equity for underserved communities.
The Public Works Agency submitted a successful application for $398,000 of funding for Orange County Transportation Authority (OCTA) bus stop facility improvements throughout the city (Exhibit 1). This project will provide one new bus shelter, 34 benches, 28 trash bins, two trees, and up to five selected sidewalk repairs. These improvements foster the District Transit Partnership’s primary objective of enhancing the cleanliness and attractiveness of bus stops within the city. The shelter and benches will afford transit users the ability to comfortably sit while waiting for bus arrivals and the new trash bins will decrease the amount of litter and debris at the bus shelters.
City Council
13 –
1 4/16/2024
Clean California Bus Stop Improvement Plan
April 16, 2024
4 1
7 2
The City received a Notice to Proceed on January 8, 2024 in the amount of $398,000 from CCLGP (Exhibit 2). A resolution authorizing the Executive Director of the Public Works Agency (Exhibit 3) to enter into a Restricted Grant Agreement (RGA) with Caltrans was approved on December 19, 2023 (Exhibit 4). The Clean California Local Grant Program (CCLGP) can be applied to projects that beautify and clean local streets and roads, tribal lands, parks, pathways, transit centers, and other public spaces. These funds were granted and can be applied towards our Bus Stop Improvement Project due to the project providing new and improved benches, trashcans, and sidewalk at bus stops within the scope.
ENVIRONMENTAL IMPACT
There is no environmental impact associated with this action. The project will assess the environmental impact for compliance with the California Environmental Quality Act (CEQA).
FISCAL IMPACT
Approval of the appropriation adjustment will recognize the receipt of $398,000 via the Select Street Construction, State Grant-Direct revenue account (No. 05917002-52025) and appropriate to the Select Street Construction, Improvements Other than Buildings, expenditure account (No. 05917660-66220).
The following table summarizes the funds budgeted and available in FY 2023-24 for expenditure to deliver this project. Any remaining balances not expended at the end of the current fiscal year will be presented to the City Council for approval to carry forward to FY 2024-25.
Fiscal
Year
Accounting Unit -
Account No.
(Project No.)
Fund
Description
Accounting Unit, Account
No. Description Amount
Appropriation Adjustment
2023-24 05917660-66220
(24-6985)
Select Street
Construction
Select Street Construction,
Improvements Other Than
Buildings
$398,000
Total $398,000
EXHIBIT(S)
1. CIP Sheet Project 24-6985
2. Clean California Transit Program Notice to Proceed
3. Executed Resolution
4. Executed Restricted Grant Agreement
Submitted By: Nabil Saba, P.E., Executive Director – Public Works Agency Approved By: Alvaro Nuñez, Acting City Manager
City Council
13 –
2 4/16/2024
CITY OF SANTA ANA FY 23/24CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
PROJECT DESCRIPTION:
This project will provide one new bus shelter, 34 benches, 28 trash bins, two trees, and up to five selected sidewalk repairs. These improvements foster the District Transit Partnership primary objective of enhancing the cleanliness and attractiveness of bus stops within the City of Santa Ana. The shelter and benches will afford transit users the ability to comfortably sit while waiting for bus arrivals and the new trash bins will decrease the amount of litter and debris at the bus shelters.
PROJECT NEED:
The Clean California Local Grant Program (CCLGP) is a competitive statewide program created to beautify and clean up local streets and roads, tribal lands, parks, pathways, transit centers, and other public spaces.
PROJECT TITLE:
Bus Stop Improvements Project
PROJECT CATEGORY:
Street Improvements
Curb, Gutter, Sidewalk
Improvements
LOCATION MAP
CITYWIDE
AGENCY: DIVISION: CONTACT: DATE:
Public Works CIP Engineering Gilbert Castillo, Senior Engineer 16-Apr-2024 PROJECT COSTS FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 Construction 368,000 - - - - - -
Engineering 30,000 - - - - - -
TOTAL 398,000 - - - - - -
SOURCE OF FUNDS FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 FED CLEAN WATER 398,000 - - - - - -
TOTAL 398,000 - - - - - -
EXHIBIT 1
City Council
13 –
3 4/16/2024
“Provide a safe and reliable transportation network that serves all people and respects the environment”
OFFICE OF CLEAN CALIFORNIA PROGRAM
1120 N St, MS–49(Room HQ-1114) | SACRAMENTO , CA 95814
(559) 917-4185 | FAX (916) 653-5776 TTY 711
www.dot.ca.gov
Clean California Transit Program
NOTICE to PROCEED
January 8, 2024
Mr. Gilbert Castillo
Grantee Project Manager
City of Santa Ana
20 Civic Center Plaza
Santa Ana, California 92702
Dear Mr. Gilbert Castillo:
Congratulations! The Restricted Grant Agreement (RGA) for the Santa Ana Bus Stop Improvements Project has been fully executed by and between City of Santa Ana and the California Department of Transportation (Caltrans). Please accept this letter as a Notice to Proceed with the scope of work outlined within the Clean California Local Grant Program for Transit executed RGA. Please note, any expenses incurred prior to the execution of the grant agreement or the date of this Notice to Proceed, whichever occurs later, cannot be reimbursed. Clean California Local Grant Program Transit funds shall not supplant other committed funds.
The complete and executed RGA for City of Santa Ana has been inc luded for your records.
The City of Santa Ana has been awarded $ 398,000.00 in Clean California Local Grant Program Transit funds. These funds are reimbursable upon submission to the CALTRANS District Partnership Liaison the Local Agency Invoice Form (LAPM5A). Please not e that only eligible expenses outlined within the approved scope of the work in the RGA will be reimbursed.
The Reimbursement Ratio for this project is 100%. The ratio was calculated by dividing the awarded Clean California Local Grant Program Transit State Funds on the project
City Council
13 –
4 4/16/2024
Mr. Gilbert Castillo, Grantee Project Manager
January 8, 2024
“Provide a safe and reliable transportation network that serves all people and respects the environment” by the total of all approved participating costs. This ratio shall be included in invoices submitted for reimbursement.
Please take before and after geotagged photographs of the project site locations that will have at a minimum the date, time, latitude, and longitude assigned to the images for all the work being performed and delivered.
If the facility has a General Transit Feed Specification (GTFS) component, then please provide the following as well:
• Location via lat/long coordinates of individual components (e.g., bus shelter, platform) being improved on
• The unique identifier of these components as it pertains to GTFS transit data feeds
Submit photos to your Clean Ca District Partnership Liaison.
Sincerely,
WALTER YU
Clean CA Program Director
Enclosures
1. Executed RGA.
2. Executed Clean CA Transit Project Proposal.
3. Executed Clean CA Transit Project Deliverables.
c: Dallia Foster
, Clean CA Program Manager
Chanta Apodaca, Clean CA Strategic Coordinator
Eric Corona, CALTRANS District Partnership Liaison
Dallia Foster (Jan 8, 2024 15:21 PST)
City Council
13 –
5 4/16/2024
12_TRANSIT_06-Notice To Proceed
Final Audit Report 2024-01-08
Created: 2024-01-08
By: Dallia Foster ([email protected])
Status: Signed
Transaction ID: CBJCHBCAABAAD_L4e4nIFiLg3DxxQNene3hbDoiM8zgy "12_TRANSIT_06-Notice To Proceed" History
Document created by Dallia Foster ([email protected])
2024-01-08 - 11:18:40 PM GMT
Document emailed to Dallia Foster ([email protected]) for signature 2024-01-08 - 11:19:04 PM GMT
Email viewed by Dallia Foster ([email protected]) 2024-01-08 - 11:21:15 PM GMT
Document e-signed by Dallia Foster ([email protected]) Signature Date: 2024-01-08 - 11:21:32 PM GMT - Time Source: server Agreement completed.
2024-01-08 - 11:21:32 PM GMT
City Council
13 –
6 4/16/2024
RESOLUTION NO. 2023- 097
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
SANTA ANA AUTHORIZING THE EXECUTIVE DIRECTOR
OF THE PUBLIC WORKS AGENCY TO EXECUTE
AGREEMENTS WITH THE CALIFORNIA DEPARTMENT OF
TRANSPORTATION FOR THE SANTA ANA BUS STOP
FACILITY IMPROVEMENTS PROJECT
WHEREAS, the City of Santa Ana is eligible to receive State funding for certain transportation - related work through the California Department of Transportation; WHEREAS, the City of Santa Ana Public Works Agency submitted a successful application for funding from the Clean California Local Grant Program for the Santa Ana Bus Stop Facility Improvements Project;
WHEREAS, a Restricted Grant Agreement is needed to be executed with the California Department of Transportation before such funds can be claimed through the Clean California Local Grant Program; and
WHEREAS, the City Council wishes to delegate authorization to execute these Agreements and amendments thereto.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Santa Ana as follows:
Section 1. The Executive Director of the Public Works Agency, or designee, is authorized to execute all Grant Agreements and any amendments thereto with the California Department of Transportation for the Santa Ana Bus Stop Facility Improvements Project.
Section 2. This Resolution shalltake effect immediatelyupon its adoption by the City Council, and the Clerk of the Council shall attest to and certify the vote adopting this Resolution.
ADOPTED this 19thday of Deceml
Resolution No. 2023- 097
EXHIBIT 3
City Council
13 –
7 4/16/2024
APPROVED AS TO FORM:
Sonia R. Carvalho, City Attorney
Byl" aVL Nru-
Brandon Salvatierra
AcQADeputyCityAttorney
AYES: Councilmembers
NOES: Councilmembers
ABSTAIN: Councilmembers
Amezcua Bacerra, Hernandez, Lopez,
Penaloza Phan Vazquez ( 7)
None ( 0)
None ( 0)
NOT PRESENT: Councilmembers None ( 0)
CERTIFICATE OF ATTESTATION AND ORIGINALITY
I, JENNIFERL. HALL, City Clerk, do herebyattestto and certifythe attachedResolution No. 2023-097 to be the original resolution adopted by the City Council of the City of Santa Ana on December 19, 2023.
Date: `4C("PWga a-s
Jennifer
of Santa
Resolution No. 2023- 097
City Council
13 –
8 4/16/2024
City Council
13 –
9 4/16/2024
City Council
13 –
10 4/16/2024
City Council
13 –
11 4/16/2024
City Council
13 –
12 4/16/2024
City Council
13 –
13 4/16/2024
City Council
13 –
14 4/16/2024
City Council
13 –
15 4/16/2024
City Council
13 –
16 4/16/2024
City Council
13 –
17 4/16/2024
City Council
13 –
18 4/16/2024
City Council
13 –
19 4/16/2024
City Council
13 –
20 4/16/2024
City Council
13 –
21 4/16/2024
City Council
13 –
22 4/16/2024
City Council
13 –
23 4/16/2024
City Council
13 –
24 4/16/2024
City Council
13 –
25 4/16/2024
City Council
13 –
26 4/16/2024
01/08/2023
Dallia Foster (Jan 8, 2024 15:20 PST)
01/08/2024
City Council
13 –
27 4/16/2024
12-Transit-06 RGA_ FINAL
Final Audit Report 2024-01-08
Created: 2024-01-08
By: Dallia Foster ([email protected])
Status: Signed
Transaction ID: CBJCHBCAABAAWlDVqVDUzflurEJlunvAnjI3LiAQh7wQ "12-Transit-06 RGA_ FINAL" History
Document created by Dallia Foster ([email protected])
2024-01-08 - 11:08:18 PM GMT
Document emailed to Dallia Foster ([email protected]) for signature 2024-01-08 - 11:08:51 PM GMT
Email viewed by Dallia Foster ([email protected]) 2024-01-08 - 11:20:36 PM GMT
Document e-signed by Dallia Foster ([email protected]) Signature Date: 2024-01-08 - 11:20:54 PM GMT - Time Source: server Agreement completed.
2024-01-08 - 11:20:54 PM GMT
City Council
13 –
28 4/16/2024
Public Works Agency
www.santa-ana.org/public-works
Item # 14
City of Santa Ana
20 Civic Center Plaza, Santa Ana, CA 92701
Staff Report
April 16, 2024
TOPIC: Proposition 1 Integrated Regional Water Management Grant Projects
AGENDA TITLE
Appropriation Adjustments and Capital Improvement Project Amendments for the Santa Ana Zoo Stormwater Capture and Diversion Project (Project No. 24-6604) and the New Washington Well Project (Project No. 19-6423) (Non-General Fund)
RECOMMENDED ACTION
1. Approve an appropriation adjustment to recognize $2,603,525 in Proposition 1 Integrated Regional Water Management (IRWM) grant funds from the California Department of Water Resources into the Miscellaneous Revenue, State Grants- Indirect Revenue Account and appropriate the same amount into the Proposition 1 Integrated Regional Water Management Program, Improvements Other than Buildings expenditure account. (Requires five affirmative votes)
2. Approve an amendment to the Fiscal Year 2023-24 Capital Improvement Program to include $2,603,525 of funding from the Department of Water Resources Proposition 1 Integrated Regional Water Management Grant Program for the Santa Ana Zoo Stormwater Capture and Diversion Project.
3. Approve an appropriation adjustment to recognize $3,394,743 in Prop 1 IRWM Grant Funds from the California Department of Water Resources into the Miscellaneous Revenue, State Grants-Indirect Revenue Account and appropriate the same amount into the Proposition 1 Integrated Regional Water Management Program, Improvements Other than Buildings expenditure account. (Requires five affirmative votes)
4. Approve an amendment to the Fiscal Year 2023-24 Capital Improvement Program to include $3,394,743 of funding from the Department of Water Resources Proposition 1 Integrated Regional Water Management Grant Program for the New Washington Well Project.
GOVERNMENT CODE §84308 APPLIES: No
City Council
14 –
1 4/16/2024
Proposition 1 Integrated Regional Water Management Grant Projects April 16, 2024
4 1
7 6
DISCUSSION
In November 2014, California voters passed Proposition 1, the Water Quality, Supply, and Infrastructure Improvement Act of 2014. Proposition 1 authorized $7.545 billion in general obligation bonds to fund, in part, water resource projects identified as regional priorities through local Integrated Regional Water Management (IRWM) Plans. In April 2023, City staff was notified of funding awards for two projects from Round 2 of the Proposition 1 IRWM program (Exhibit 1).
Washington Well Project
The majority of the City of Santa Ana’s potable water comes from the Orange County Groundwater Basin (OC Basin) and is pumped through 21 existing City wells. Due to a variety of issues, including the presence of per- and polyfluoroalkyl substances (PFAS) found in routine well monitoring, several wells in the City have been taken offline. Given the limited water supplies in the region, and recent recurring drought conditions, removing wells from the City’s potable water distribution system will reduce its reliability.
Rehabilitating existing wells or constructing new wells will reduce the burden on other City water production facilities and the reliance on imported water sources.
The Water Resources Division is currently in the initial phase of drilling for the Washington Well Project, which will ultimately construct a new well that will address low-pressure deficiencies in the distribution system and will add approximately 4,000 acre-feet per year to the City’s pumping capacity. The current Proposition 1, Round 2 IRWM grant funding will provide up to $3,394,743 in grant funds for the construction of the well. The City has already received grant funding in the amount of $100,000 from the Santa Ana Watershed Project Authority for the design of the project, and $750,000 from the United States Department of Interior Bureau of Reclamation for construction.
The total construction cost for drilling the well is $3,432,274, with an anticipated equipping cost of $4,500,000.
The well drilling phase of construction is anticipated to have a completion date in August 2024. Equipping and commissioning of the well should be completed by winter of 2026.
Santa Ana Zoo Stormwater Capture and Diversion Project
The Santa Ana Zoo Stormwater Capture and Diversion (SAZSCAD) Project features the construction of subsurface stormwater infiltration systems at the Santa Ana Zoo. The project is designed to capture and infiltrate approximately 67 acre-feet per year (AFY) of stormwater and dry-weather runoff to help improve water quality in the Newport Bay watershed, increase local water supplies, and reduce flooding downstream. The project will also include a new urban green space, bioswales, pervious pavement, seating, drought tolerant landscaping and shade trees, and interpretive signage promoting watershed and water quality education to Zoo visitors. The Public Works Agency has collaborated with Santa Ana Zoo staff on the project and Caltrans is a project partner.
The project has received letters of support from the Regional Water Board, Orange County Water District, and a local environmental nonprofit.
City Council
14 –
2 4/16/2024
Proposition 1 Integrated Regional Water Management Grant Projects April 16, 2024
4 1
7 6
The final design phase of the project will start upon approval of the Proposition 1 IRWM grant funding and take approximately 1-year to complete. Construction is anticipated to start in fall 2025.
ENVIRONMENTAL IMPACT
There is no environmental impact associated with this action. The project design consultant will assess the environmental impact of this project in compliance with the California Environmental Quality Act (CEQA).
FISCAL IMPACT
Approval of the requested appropriation adjustments will accept Proposition 1 IRWM grant funding of $5,998,268 from the California Department of Water Resources into the PWA Enterprise Capital Grants, Miscellaneous Revenue, State Grants-Indirect Revenue Account (No. 16417002-52027) and appropriate the same amount into the Proposition 1 IRWM Program, Improvements Other than Buildings (No. 16417643- 66220). With the approval of the amendments to the FY 2023-24 Capital Improvement Program, funds will be budgeted and available for expenditure in FY 2023-24 (Exhibits 2 & 3). The remaining balance not expended at the end of the fiscal year will be presented to the City Council for approval of carryovers to FY 2024-25.
The following table summarizes the funds budgeted and available for expenditure to deliver this project.
Fiscal Year
Accounting Unit -
Account No.
(Project No.)
Fund
Description
Accounting Unit,
Account No. Description Amount
Appropriation Adjustments
2023-24 16417643-66220
(24-6604)
PWA
Enterprise
Capital Grants
Prop 1 IRWM Program,
Improvements Other Than
Buildings
$2,603,525
2023-24 16417643-66220
(19-6423)
PWA
Enterprise
Capital Grants
Prop 1 IRWM Program,
Improvements Other Than
Buildings
$3,394,743
Total $5,998,268
EXHIBIT(S)
1. Prop 1 IRWM Round 2 Funding Award List
2. SAZCAD Project FY 2023-24 CIP Sheet
3. New Washington Well Project FY 2023-24 CIP Sheet
Submitted By: Nabil Saba, P.E., Executive Director – Public Works Agency Approved By: Alvaro Nuñez, Acting City Manager
City Council
14 –
3 4/16/2024
Final Funding Recommendations – Round 2 Integrated Regional Water Management (IRWM) Implementation Grant Solicitation
April 2023
IRWM Region: Santa Ana Applicant: Santa Ana Watershed Project Authority Project Name Project Implementing Agency
Primary
Benefit
DAC Implementation Funds General Implementation Funds
Requested Awarded Requested Awarded
Grant Administration Santa Ana Watershed Project Authority N/A $1,352,929 $1,352,929 Santa Ana Watershed Weather Modification Pilot
Project Santa Ana Watershed Project Authority Water Supply $861,400 $861,400 Etiwanda Intervalley Water Quality and Water
Resiliency Project Phase-1A Jurupa Community Services District Water Supply $2,954,213 $2,954,213 Wellhead Nitrate Treatment for Wells 4 & 27 Monte Vista Water District Water Supply $2,533,492 $2,533,492 Cable Creek Basin (Upper) San Bernardino County Flood Control District Stormwater and
Flood
Management
$2,521,678 $2,521,678
Lake Elsinore Algae Harvesting and Nutrient
Removal Pilot Project Lake Elsinore and San Jacinto Watersheds Authority Water Quality $1,500,000 $1,500,000 Lake Rialto Habitat Management and Community
Open Space Project City of Rialto Water Quality $2,149,748 $2,149,748 Well 2 Replacement Monte Vista Water District Water Supply $2,006,311 $2,006,311 New Washington Well Project City of Santa Ana Water Supply $3,394,743 $3,394,743 Water Quality: Lead Service Line Replacements in
the Bloomington DAC West Valley Water District Water Quality $315,000 $315,000 Box Springs Mutual Water Company Well
Improvement Project Box Springs Mutual Water Company Water Supply $1,885,257 $385,257 $1,500,000 Orange County Regional PFAS Groundwater
Treatment Program Orange County Water District Water Supply $4,200,000 $4,200,000 Santa Ana Zoo Stormwater Capture and Diversion
Project City of Santa Ana
Stormwater and
Flood
Management
$2,603,525 $2,603,525
Making Conservation an Orange County Way of Life Municipal Water District of Orange County Water Conservation
$780,275 $780,275
Totals: $5,595,000 $4,095,000 $23,463,571 $24,963,571 Total Final Award $29,058,571
Funding Area: Santa Ana
Cycle 2 Award: $29,058,571
City Council
14 –
4 4/16/2024
City Council
14 –
5 4/16/2024
CITY OF SANTA ANA FY
23/24
CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
PROJECT DESCRIPTION:
Design of a new groundwater well.
PROJECT NEED:
A new well will help increase the reliability and performance of the water system and improve customer experience.
PROJECT TITLE:
Washington Well Site Improvements
PROJECT CATEGORY:
Utility/Drainage/Lighting
Improvements
Water Improvements
LOCATION MAP
AGENCY:
DIVISION:
CONTACT:
DATE:
Public Works
Water Resources
Armando Fernandez, Senior Civil Engineer
19-Mar-2024
PROJECT COSTS
FY 23/24
FY 24/25
FY 25/26
FY 26/27
FY 27/28
FY 28/29
FY 29/30
Construction
3,394,743
-
-
-
-
-
-
TOTAL
3,394,743
-
-
-
-
-
-
SOURCE OF FUNDS
FY 23/24
FY 24/25
FY 25/26
FY 26/27
FY 27/28
FY 28/29
FY 29/30
Prop 1 IRWM Grant
3,394,743
-
-
-
-
-
-
TOTAL
3,394,743
-
-
-
-
-
-
City Council
14 –
6 4/16/2024
Public Works Agency
www.santa-ana.org/public-works
Item # 15
City of Santa Ana
20 Civic Center Plaza, Santa Ana, CA 92701
Staff Report
April 16, 2024
TOPIC: Compressed Natural Gas Fueling Services
AGENDA TITLE
Blanket Order Contract to US Gain, a Division of US Venture Inc., for Compressed Natural Gas Fueling Services (Spec No. 24-049) (Non-General Fund)
RECOMMENDED ACTION
Award Blanket Order Contract to US Gain, a Division of US Venture Inc., for compressed natural gas fueling services, in amount not to exceed $240,000, on an as- needed basis, for an initial one-year term beginning April 16, 2024 and expiring April 15, 2025, with provisions for one, one-year renewal option.
GOVERNMENT CODE §84308 APPLIES: Yes
DISCUSSION
The City’s Public Works Agency utilizes a variety of heavy equipment vehicles and trucks to deliver street maintenance, water, and sewer services. The City recently completed its goal of transitioning all heavy equipment vehicles from diesel fuel- powered to natural gas-powered.
On August 17, 2021, the City Council approved an agreement with OPAL Fuels Station Services, LLC (formerly TruStar Energy, LLC) to provide services for Phase I, Design; Phase II, Equipment Procurement; and Phase III, Construction of a new Compressed Natural Gas (CNG) fueling station at the City Corporate Yard. On December 20, 2022, the City Council approved an amendment to the agreement with OPAL Fuels Station Services to update the agreement’s scope of work to include a publicly-accessible fuel station.
The City’s 31 CNG-powered vehicles had been fueling at the City’s Corporate Yard with supplemental fueling performed at a US Gain fueling station located within City boundaries at 1601 East 1st Street. During the past few months, the Corporate Yard’s CNG station stopped being functional and after numerous maintenance and repair services efforts, it has been determined to be cost-prohibitive to repair Corporate Yard’s CNG station. The above-mentioned project with OPAL Fuels Station Services is over a year away from completion. Staff is requesting contract authority to allow for CNG fueling services with US Gain, which will allow City CNG-powered fleet vehicles to
City Council
15 –
1 4/16/2024
Compressed Natural Gas Fueling Services
April 16, 2024
4 1
7 8
continue their everyday operations without any fueling interruptions while City staff actively seeks contracting options for CNG fueling services.
FISCAL IMPACT
Funding is available in the current FY 2023-24 budget and funding for subsequent fiscal year will be included in the proposed budget for City Council consideration.
Fiscal Year Accounting
Unit- Account
#
Fund
Description
Accounting Unit,
Account
Description
Amount
2023-24
Apr – Jun
07617102-
63301
Stores & Property
Control
Stores & Property
Control, Alternative
Fuel-CNG
$45,000
2024-25 07617102-
63301
Stores & Property
Control
Stores & Property
Control, Alternative
Fuel-CNG
$120,000
2025-26 07617102-
63301
Stores & Property
Control
Stores & Property
Control, Alternative
Fuel-CNG
$75,000
TOTAL $240,000
Submitted By: Nabil Saba, P.E., Executive Director – Public Works Agency Approved By: Alvaro Nuñez, Acting City Manager
City Council
15 –
2 4/16/2024
Public Works Agency
www.santa-ana.org/public-works
Item # 16
City of Santa Ana
20 Civic Center Plaza, Santa Ana, CA 92701
Staff Report
April 16, 2024
TOPIC: Manhole Covers, Water Valves, and Covers
AGENDA TITLE
Aggregate Blanket Order Contracts to Famcon Pipe & Supply, Inc. and Core & Main for Manhole Covers, Water Valves, and Covers in an Aggregate Amount Not to Exceed $1,235,000 (Specification No. 24-019) (Non-General Fund)
RECOMMENDED ACTION
Award aggregate blanket order contracts to Famcon Pipe & Supply, Inc. and Core & Main for the purchase of manhole covers, water valves, and covers on an as-needed basis in an aggregate amount not to exceed $1,235,000, for a two-year term beginning April 16, 2024 and expiring April 15, 2026, with provisions for three, one-year renewal options.
GOVERNMENT CODE §84308 APPLIES: No
DISCUSSION
The Public Works Agency’s Water Resources Division (Water Resources Division) oversees the operation of 21 City-owned wells, seven pump stations, 50 water quality monitoring stations, 10 storage reservoirs, over 480 miles of water pipeline, and over 450 miles of sewer mains.
The Water Resources Division, Sewer Maintenance section maintains the City’s sanitary sewer infrastructure. Sewer manholes are essential to any sewer system as they provide access points to assess the system. Having standard manhole frames and covers eliminates the guess work for replacement parts and fast response to emergency replacement.
Additionally, the Water Resources Division, Water Maintenance section maintains the City’s water distribution system. Water valves serve as access points to turn off water at certain points in the system for repairs and maintenance to the distribution infrastructure. Standardizing gate valve frame and covers are essential to the efficient replacement of old, dilapidated frames and covers in the system.
The Invitation for Bids (IFB) No. 24-019 was advertised on February 8, 2024 on the
City Council
16 –
1 4/16/2024
Manhole Covers, Water Valves, and Covers
April 16, 2024
4 1
7 7
City’s online bid management and publication system. A summary of IFB vendor participation and results is as follows:
43 Vendors notified
2 Santa Ana vendors notified
18 Vendors downloaded the bid packet
2 Bids received
1 Bid received from Santa Ana vendors
Bids were solicited, opened on February 27, 2024, and evaluated (Exhibit 1). Two bids were submitted by the IFB deadline, and both bids submitted by Famcon Pipe & Supply, Inc. of Oxnard, CA, and Core & Main of Santa Ana, CA were determined to be the lowest responsible bids, were responsive to the specifications of the bid, and met the City’s requirements. Staff recommends awarding contracts to Famcon Pipe & Supply, Inc. and Core & Main to ensure availability of resources. Famcom Pipe is a new vendor to Santa Ana, but has been in business for waterworks materials and supplies since the 1980’s. Core and Main became an independent company in 2017, and has been a provider of various waterworks supplies and materials for the City for multiple projects.
FISCAL IMPACT
Funding is available in the current FY 2023-24 budget and funding for subsequent fiscal years will be included in the proposed budgets for City Council consideration.
Fiscal
Year
Accounting Unit-
Account #
Fund Description Accounting Unit,
Account
Description
Amount
05617640-63001 Sanitary Sewer
Fund
Sanitary Sewer
Service,
Miscellaneous
Operating Expenses
$50,000
FY 23-24
Apr - Jun
06017641-63001 Water Fund
Water System
Maintenance,
Miscellaneous
Operating Expenses
$30,000
FY 24-25 05617640-63001 Sanitary Sewer
Fund
Sanitary Sewer
Service,
Miscellaneous
Operating Expenses
$165,000
06017641-63001 Water Fund
Water System
Maintenance,
Miscellaneous
Operating Expenses
$82,000
FY 25-26 05617640-63001 Sanitary Sewer
Fund
Sanitary Sewer
Service,
Miscellaneous
Operating Expenses
$165,000
City Council
16 –
2 4/16/2024
Manhole Covers, Water Valves, and Covers
April 16, 2024
4 1
7 7
Fiscal
Year
Accounting Unit-
Account #
Fund Description Accounting Unit,
Account
Description
Amount
06017641-63001 Water Fund
Water System
Maintenance,
Miscellaneous
Operating Expenses
$82,000
05617640-63001 Sanitary Sewer
Fund
Sanitary Sewer
Service,
Miscellaneous
Operating Expenses
$165,000
FY 26-27
06017641-63001 Water Fund
Water System
Maintenance,
Miscellaneous
Operating Expenses
$82,000
05617640-63001 Sanitary Sewer
Fund
Sanitary Sewer
Service,
Miscellaneous
Operating Expenses
$165,000
FY 27-28
06017641-63001 Water Fund
Water System
Maintenance,
Miscellaneous
Operating Expenses
$82,000
05617640-63001 Sanitary Sewer
Fund
Sanitary Sewer
Service,
Miscellaneous
Operating Expenses
$115,000
FY 28-29
Jul - Apr
06017641-63001 Water Fund
Water System
Maintenance,
Miscellaneous
Operating Expenses
$52,000
TOTAL $1,235,000
EXHIBIT(S)
1. Bid Abstract
Submitted By: Nabil Saba, P.E., Executive Director – Public Works Agency Approved By: Alvaro Nuñez, Acting City Manager
City Council
16 –
3 4/16/2024
BIDDER LOCATION TOTAL
Famcon Pipe & Supply, Inc. Oxnard, CA 222,660 $
Core & Main Santa Ana, CA 237,429 $
MANHOLE LIDS, WATER VALVES, & Covers (Bid No. 24-019)
ABSTRACT OF BIDS
EXHIBIT 1
City Council
16 –
4 4/16/2024
Public Works Agency
www.santa-ana.org/public-works
Item # 17
City of Santa Ana
20 Civic Center Plaza, Santa Ana, CA 92701
Staff Report
April 16, 2024
TOPIC: West Side Bleacher Seating at Santa Ana Stadium
AGENDA TITLE
Purchase Order to Southern Bleacher Company, Inc. for the Purchase and Installation of Bleacher Seating in an Amount Not to Exceed $549,214 (Specification No. 24-045) (General Fund)
RECOMMENDED ACTION
Authorize a one-time purchase and payment of a purchase order to Southern Bleacher Company, Inc. for bleacher seating and corresponding installation services for the Santa Ana Stadium in the amount of $499,285, plus a contingency amount of $49,929, for a total amount not to exceed $549,214.
GOVERNMENT CODE §84308 APPLIES: No
DISCUSSION
The Public Works Agency’s Parks Maintenance Division is responsible for overseeing and repairing various parks and facilities. The City-owned Santa Ana Stadium (Stadium) is a multifunctional, outdoor stadium that hosts many events including local sports leagues, football, and soccer games, high schools and college athletics, commencement ceremonies, and various citywide events. Additionally, the 9,000-seat stadium has hosted national and international soccer leagues for exhibition games. The programming at the Santa Ana Stadium provides leisure, recreation, and entertainment opportunities for residents and highlights our city facility to outside visitors.
The Public Works staff, in collaboration with Parks and Recreation staff, have evaluated the seating at the Stadium and determined that improvements were necessary to support the various sporting and recreation events hosted at this site. Due to prolonged sun exposure and consistent usage, the current seating has broken plastic seats and has faded in color. The installation of new seating (Project No. 24-2602) will provide suitable and safe seating for stadium patrons and a comfortable viewing experience for City residents and visitors alike. Installation of new seating will entail demolition of current existing west side seating by our Public Works General Maintenance staff and the Southern Bleacher Company will provide aluminum seating, backrest materials, and installation at the west side of the stadium (Exhibit 1).
City Council
17 –
1 4/16/2024
West Side Bleacher Seating for the Santa Ana Stadium
April 16, 2024
4 1
7 9
Santa Ana City Ordinance No. NS-3401 authorizes the City to purchase against contracts from any public agency utilizing a competitive bid process. BuyBoard, a cooperative government purchasing agency, awarded a contract to Southern Bleacher Company, Inc. (Contract No. 665-22) as a result of open, competitive bidding on behalf of its members, which includes government agencies.
Staff researched available procurement options and product offerings in the market, and determined that Southern Bleacher Company, Inc. meets the City’s specifications. By leveraging the procurement power through cooperative purchasing, the City of Santa Ana is able to obtain nationally vetted, high quality products at competitive volume pricing, and is in accordance with the City’s existing Purchasing guidelines.
FISCAL IMPACT
Funds for the requested Purchase Order of $549,214 for materials and installation is available for expenditure in Fiscal Year 2023-24. Any remaining balances not expended at the end of the fiscal year will be carried forward to the following fiscal year.
Fiscal
Year
Accounting
Unit-Account #
Fund
Description
Accounting Unit,
Account
Description
Amount
2023-24
01113017-
66220
(24-2602)
General Fund
PRCSA Service
Enhancement-
Improvements Other
Than Building
549,214
TOTAL $549,214
EXHIBIT(S)
1. Bleacher Replacement Location
Submitted By: Nabil Saba, P.E., Executive Director – Public Works Agency Approved By: Alvaro Nuñez, Acting City Manager
City Council
17 –
2 4/16/2024
Stadiu1n Seat Replacement
EXHIBIT 1
City Council
17 –
3 4/16/2024
Public Works Agency
www.santa-ana.org/public-works
Item # 18
City of Santa Ana
20 Civic Center Plaza, Santa Ana, CA 92701
Staff Report
April 16, 2024
TOPIC: Santa Ana Boulevard Grade Separation Project
AGENDA TITLE
Amendment to Agreement with Mark Thomas & Company for Grant Writing Services (Project No. 22-6899 & 24-6899) (Non-General Fund)
RECOMMENDED ACTION
Authorize the City Manager to execute the first amendment to the agreement with Mark Thomas & Company, Inc. for grant writing services for the Santa Ana Boulevard Grade Separation in the amount of $69,654, with a contingency amount of $10,346, for a new total agreement amount of $330,000 (Agreement No. A-2024-XXX).
GOVERNMENT CODE §84308 APPLIES: Yes
DISCUSSION
The proposed Santa Ana Boulevard Grade Separation is adjacent to the Santa Ana Regional Transportation Center (SARTC), and will include a new six-lane underpass to replace the existing at-grade rail crossing at the Southern California Regional Rail Authority (SCRRA) double tracks on Santa Ana Boulevard. This project will provide connectivity across Santa Ana Boulevard to SARTC, and improvements will also include a raised median, bike lanes, sidewalks, storm water pump station, space for a transportation opportunity zone, and a pedestrian plaza.
On September 27, 2021, the Public Works Agency released Request for Proposals (RFP) No. 21-111, by which it sought the services of a professional engineering firm to provide grant writing services for the Public Works Agency Santa Ana Boulevard Grade Separation Project. Mark Thomas & Company, Inc. was awarded an agreement based upon the scope of work and selection criteria outlined in the RFP.
Mark Thomas & Company, Inc. has submitted several grant applications for the Santa Ana Boulevard Grade Separation as part of the original agreement scope, including one successful grant award of $7,000,000. Staff recommends executing an amendment to the current agreement with Mark Thomas & Company, Inc. to provide grant writing services for an additional three grant applications, including the Railroad Crossing Elimination Program (RCE), Trade Corridor Enhancement Program (CEP), and
City Council
18 –
1 4/16/2024
Santa Ana Boulevard Grade Separation Project
April 16, 2024
4 1
7 3
Reconnecting Communities and Neighborhoods (RCN) Program for the Santa Ana Boulevard Grade Separation project (Exhibit 1).
FISCAL IMPACT
Funds are budgeted and available for expenditure in the current Fiscal Year 2023-24.
The following table summarizes the reallocation of funds that will be budgeted to fund the grant writing services per the agreement amendment. Since the scope of work is contingent on the schedule of future grant applications prepared and submitted, any remaining balances not expended at the end of the agreement term will be carried forward for expenditure into FY 2024-25 and FY 2025-26 in the event the optional extension periods are exercised.
EXHIBIT(S)
1. Agreement Amendment with Mark Thomas & Company, Inc.
Submitted By: Nabil Saba, P.E., Executive Director – Public Works Agency Approved By: Alvaro Nuñez, Acting City Manager
Fiscal
Year
Accounting Unit -
Account No.
Fund
Description
Accounting
Unit - Account
No. Description
Amount
Current Project Budget
2023-24 03217662-66220
(Proj. 22-6899)
Measure M
Street
Construction
Measure M2
Local Fairshare,
Improvements
Other Than
Buildings
$250,000
Amendment
2023-24 03217662-66220
(Proj. 24-6899)
Measure M
Street
Construction
Measure M2
Local Fairshare,
Improvements
Other Than
Buildings
$80,000
TOTAL: $330,000
City Council
18 –
2 4/16/2024
EXHIBIT 1
City Council
18 –
3 4/16/2024
City Council
18 –
4 4/16/2024
City Council
18 –
5 4/16/2024
City Council
18 –
6 4/16/2024
City Council
18 –
7 4/16/2024
City Council
18 –
8 4/16/2024
City Council
18 –
9 4/16/2024
City Council
18 –
10 4/16/2024
City Council
18 –
11 4/16/2024
Public Works Agency
www.santa-ana.org/public-works
Item # 19
City of Santa Ana
20 Civic Center Plaza, Santa Ana, CA 92701
Staff Report
April 16, 2024
TOPIC: Site Sublicense Agreement For Bus Passenger Services
AGENDA TITLE
Site License Agreement with Pacific Coast Shuttles, LLC, dba Futura Bus Net, Inc to allow for Sublicense Agreement with Ohana Shuttles, LLC for Bus Passenger Services at the Santa Ana Regional Transportation Center
RECOMMENDED ACTION
Authorize the City Manager to amend the site license agreement with Pacific Coast Shuttles, LLC, dba Futura Bus Net, Inc., to allow for a sub-license agreement with Ohana Shuttles, LLC to compensate the City $1,500 per month for the rental of one bus bay for bus passenger services at the Santa Ana Regional Transportation Center, for a one-year term beginning May 1, 2024 and ending April 30, 2025, with the option for three, one-year renewal periods (Agreement No. 2024-XXX).
GOVERNMENT CODE §84308 APPLIES: Yes
DISCUSSION
The Santa Ana Regional Transportation Center (SARTC) is a regional transportation hub that brings together Amtrak, Metrolink, Orange County Transportation Authority (OCTA), and interstate bus services. It is open to the public seven days a week from 5:00 a.m. to midnight and contains approximately 35,000 square feet of total rental space, including ten bus bays.
In October 2023, the City Council approved a site license agreement with Pacific Coast Shuttles, LLC authorizing the use of Bus Bay #8 to provide interstate bus services for a six-month term, with the option for four one-year renewals. Due to the positive outcome, the Licensee would like to sublicense this bay to their sister company, Ohana Shuttles, to address the high demand in Orange County and provide a higher level of service for their patrons. Ohana Shuttles, LLC began in 2022 and provides the same bus passenger services.
Staff recommends amending the site license agreement with Pacific Coast Shuttles, LLC, to allow for a sublicense agreement with Ohana Shuttles, LLC to license one bus bay for a one-year period, with three one-year renewal options (Exhibit 1).
City Council
19 –
1 4/16/2024
Site Sublicense Agreement For Bus Passenger Services
April 16, 2024
4 1
7 4
FISCAL IMPACT
Following the approval of the agreement amendment, lease income totaling $3,000 for Fiscal Year 2023-24, at a rate of $1,500 per month, will be recognized into the Public Works Agency-SARTC Operations, Rental-Ohana Shuttles revenue account.
Fiscal
Year
Accounting
Unit-
Account No.
Fund
Description
Accounting Unit-
Account No.
Description
Amount
FY 23-24 06717002-
53835
Regional
Transportation
Center
PWA-SARTC
Operations – Rental –
Ohana Shuttles
$3,000
TOTAL $3,000
EXHIBIT(S)
1. Site Sublicense Agreement with Ohana Shuttles, LLC
Submitted By: Nabil Saba, P.E., Executive Director – Public Works Agency Approved By: Alvaro Nuñez, Acting City Manager
City Council
19 –
2 4/16/2024
EXHIBIT 1
City Council
19 –
3 4/16/2024
City Council
19 –
4 4/16/2024
City Council
19 –
5 4/16/2024
Public Works Agency
www.santa-ana.org/public-works
Item # 20
City of Santa Ana
20 Civic Center Plaza, Santa Ana, CA 92701
Staff Report
April 16, 2024
TOPIC: Santa Ana Zoo Educational Hub Building Project
AGENDA TITLE
Amend Agreement with LOC Architects to Increase the Design Services for the Santa Ana Zoo Educational Hub Building Project (Project No. 23-2601)
RECOMMENDED ACTION
Authorize the City Manager to execute a first amendment to the consultant agreement with LOC Architects for design services for the Santa Ana Zoo Educational Hub Project (Project No. 23-2601) to increase the amount by $123,400, for a total amount not to exceed $508,520 (Agreement No. A-2024-XXX).
GOVERNMENT CODE §84308 APPLIES: Yes
DISCUSSION
On May 3, 2022, the City Council adopted a resolution approving the acceptance of grant funds from the State of California Natural Resources Agency for the Santa Ana Zoo Educational Hub Building Project, and authorized the City Manager to execute grant documents. The new educational hub building will include a large multipurpose space, classrooms, and serve as a hub for community volunteers and zoo staff. The classrooms are flexible in design to maximize their use potential throughout the day and year. The 2,600 square foot multipurpose space is also designed so it can serve as a rental space at times, generating additional revenue.
On February 22, 2023, the Public Works Agency (PWA) released a Request for Proposals (RFP) No. 23-033 to select a professional architectural services firm for the Santa Ana Zoo Educational Hub Building project. These services include all design and engineering as required for the project scope. After reviewing all proposals, an agreement was executed with LOC Architects on August 1, 2023.
The RFP and initial award of the contract to LOC Architects was for the design of one new “Hive” building. Site and underground surveys revealed that several trees and an Edison easement conflicted with the new building location. Additional office spaces and a multi-functional room which can be used as both a classroom and community event space will allow for expanded programming. After consideration of several design concepts that would accommodate these factors and meet the needs of the community, Staff recommends that the scope of this project now includes two buildings separated
City Council
20 –
1 4/16/2024
Santa Ana Zoo Educational Hub Building Project
April 16, 2024
4 1
8 0
by a gathering space (exhibit attached). This new scope will increase the square footage of the project, and additional cost for the structural and electrical design, without compromising design efforts.
An amendment to the current agreement will increase the total agreement amount to $508,520 (Exhibit 2). PWA and Parks and Recreation staff provided the best design program possible in the RFP for services prior to commencing design, but after thorough assessment of project and the needs of LOC Architects, staff recommends the approval of the recommended action as the change provides the best long-term project for the City.
FISCAL IMPACT
There is no fiscal impact associated with this action. The originally approved project cost total will not change.
EXHIBIT(S)
1. Site Plan
2. Agreement Amendment
Submitted By: Nabil Saba, P.E., Executive Director – Public Works Agency Approved By: Alvaro Nuñez, Acting City Manager
City Council
20 –
2 4/16/2024
City Council
20 –
3 4/16/2024
FIRST AMENDMENT TO CONSULTANT AGREEMENT BETWEEN THE CITY OF
SANTA ANA AND LOC ARCHITECTS TO PROVIDE PROFESSIONAL
ARCHITECTURAL SERVICES FOR THE SANTA ANA ZOO
EDUCATIONAL HUB BUILDING PROJECT
THIS FIRST AMENDMENT to the above-referenced agreement is entered into on April 16, 2024, by and between LOC Architects (“Consultant”) and the City of Santa Ana, a charter city and municipal corporation organized and existing under the Constitution and laws of the State of California (“City”).
RECITALS
A. The parties entered into Agreement No. A-2023-136, dated August 1, 2023 , by which Consultant agreed to p rovide professional architectural services for the Santa Ana Zoo Educational Hub Building Project (“Project”) for the City’s Public Works Agency (“Agreement”).
B. The Agreement is current and in-effect, and expires on July 31, 2026.
C. The parties now wish to amend the Scope of Services set forth in the Agreement to expand the overall size of the Project in order to accommodate the Zoo and community ’s needs, which requires the design of two buildings/structures (rather than one), with a gathering space in between the two buildings/structures. The parties further wish to increase the total not -to- exceed amount due under the Agreement to reflect this additional design concept. No other changes are contemplated by this First Amendment.
The Parties therefore agree:
1. Section 1, Scope of Services, is hereby amended to include the following language:
Furthermore, Consultant will provide an expanded scope of services for the proposed education hub at the Santa Ana Zoo to address the increased size of the project , as more particularly described in Consultant’s “Supplemental Services Authorization” and “Site Plan ,” which are attached hereto and incorporated herein as Exhibit A-1 and Exhibit B-1, respectively.
2. Section 2.a., Compensation , is amended to increase the not -to-exceed amount by an additional $123,400.00, for a total not-to-exceed amount under the Agreement of $508,520.00.
This sum is comprised of (1) a base amount of $473,520.00 and (2) a contingency in the amount of $35,000.00, for any additional and as -needed services to be exercised at the City’s sole discretion.
3. Except as modified by this First Amendment, all terms and conditions of the Agreement shall remain in full force and effect.
[signatures on following page]
EXHIBIT 2
City Council
20 –
4 4/16/2024
SIGNATURE PAGE FIRST AMENDMENT TO CONSULTANT AGREEMENT
BETWEEN THE CITY OF SANTA ANA AND LOC ARCHITECTS TO PROVIDE
PROFESSIONAL ARCHITECTURAL SERVICES FOR THE SANTA ANA ZOO
EDUCATIONAL HUB BUILDING PROJECT
IN WITNESS WHEREOF, the parties hereto have executed this First Amendment to the Agreement on the date and year first written above.
ATTEST CITY OF SANTA ANA
_______________________________ ______________________________ JENNIFER L. HALL TOM HATCH
City Clerk Interim City Manager
APPROVED AS TO FORM CONSULTANT
Sonia R. Carvalho
City Attorney
By:___________________________ _______________________________ JONATHAN T. MARTINEZ By:
Assistant City Attorney Title:
RECOMMENDED FOR APPROVAL
________________________________
NABIL SABA
Executive Director
Public Works Agency
Poonam Sharma
Principal, LOC
City Council
20 –
5 4/16/2024
LOC
453 S. Spring St. Ste.1126
Los Angeles, CA 90013
213.537.0480
www. loc-arch.com
S U P P L E M E N T A L S E R V I C E S A U T H O R I Z A T I O N March 12, 2024
City of Santa Ana
Gilbert Castillo
20 Civic Center Plaza
P.O. Box 1988
Santa Ana, CA 93792-1988
2308.01 Expanded Project Scope
Dear Mr. Castillo
Per the Owner's request, we are providing this proposal to perform the following additional services:
• Provided an expanded scope of complete architectural services for the proposed education hub at the Santa Ana Zoo to address the increased size of the project • The project is now 8,300 SF in size, vs. 6,000 SF as indicated in the RFP (38% increase). The site area is now 15,000 SF in size, vs. 9,000 SF in the RFP (67% increase).
We propose to provide these additional services for fixed fee of One Hundred and Twenty-Three Thousand Four Hundred Dollars ($123,400).
LOC INC. (Architectural) $49,800
KPFF (Structural) $34,000
KPFF (Civil) $30,000
Consultant Subtotal $64,000
LOC, INC. mark-up (15%) $9,600
Total $123,400
EXHIBIT A-1
City Council
20 –
6 4/16/2024
LOC
453 S. Spring St. Ste.1126
Los Angeles, CA 90013
213.537.0480
www. loc-arch.com
If this is acceptable to the City of Santa Ana and you would like us to proceed, please sign below and return to us.
Best Regards,
Ali Jeevanjee, Architect
Principal, LOC, INC.
For the City of Santa Ana
____________________________ ________________________
Signature Date Printed Name and Title
City Council
20 –
7 4/16/2024
EXHIBIT B-1
Edison Easement
Trees to be
protected
Trees to be
protected
City Council
20 –
8 4/16/2024
Public Works Agency
www.santa-ana.org/public-works
Item # 21
City of Santa Ana
20 Civic Center Plaza, Santa Ana, CA 92701
Staff Report
April 16, 2024
TOPIC: Master Plan of Arterial Highways
AGENDA TITLE
Memorandum of Understanding for the Master Plan of Arterial Highways with the Orange County Transportation Authority and the City of Irvine
RECOMMENDED ACTION
Authorize the City Manager to execute a Memorandum of Understanding for the Master Plan of Arterial Highways Amendment with the Orange County Transportation Authority and the City of Irvine (Agreement No. A-2024-XXX).
GOVERNMENT CODE §84308 APPLIES: Yes
DISCUSSION
The Master Plan of Arterial Highways (MPAH) is the countywide roadway network for regional mobility managed by the Orange County Transportation Authority (OCTA), and cities must comply to qualify for M2 Funds. Coordination and consensus between the cities is required whenever changes to the MPAH are requested by any of local agencies that form part of the MPAH. The process described below was similarly followed by the City of Santa Ana (City) when an MPAH amendment was processed by the City back in June 2021 to reclassify several roadways in the City.
The City of Irvine has requested an amendment to the MPAH to reclassify Red Hill Avenue, between MacArthur Boulevard and Main Street, from a major six-lane to a primary four-lane arterial. The IBC Vision Plan 2018 Traffic Study Update Alternative Analysis (Exhibit 1), conducted as part of the MPAH amendment process, determined that the amendment to the MPAH would result in cumulative projected changes to future traffic patterns.
These projected changes in future traffic patterns result in a determination that appreciable impacts may occur at the intersections of Flower Street/MacArthur Boulevard and Flower Street/Segerstrom Avenue, both intersections which are located in the city. Improvements identified to mitigate appreciable impacts at the two intersections will be fully mitigated by adding an eastbound right turn lane at the intersection of Flower Street and MacArthur Boulevard and adding a westbound right turn lane at the intersection of Flower Street and Segerstrom Avenue which require right-of-way acquisition. It should be noted that the City will monitor the individual intersection performance and is only required to implement such improvements should the thresholds impacting the operations of the intersections be triggered.
City Council
21 –
1 4/16/2024
Master Plan of Arterial Highways
April 16, 2024
4 1
8 1
The City of Irvine shall provide the City a 1.1% fair share funding for Flower Street at Segerstrom Avenue and 1.0% fair share funding for Flower Street at MacArthur Boulevard. The projects will be programmed in the future Capital Improvement Program.
This MPAH amendment will require the execution of a Memorandum of Understanding (MOU) between OCTA and the Cities of Irvine and Santa Ana (Exhibit 2). All parties, the City of Irvine and Santa Ana, have agreed to these terms and conditions since there are traffic impacts to be coordinated between the two jurisdictions.
Staff recommends approving terms and conditions, and authorizing the City Manager to negotiate and execute a memorandum of understanding.
FISCAL IMPACT
There are two traffic operation improvements identified in the MOU within the City of Santa Ana. Implementation of these improvements require the traffic congestion to degrade to a certain threshold in the future. These locations will be monitored and, if the threshold is met, the projects will be programmed into a future CIP and funded accordingly. Project funding to be identified in the future will include grant funds, Transportation System Impact Area fees, and Irvine’s fair share. There is no fiscal impact at this time.
EXHIBIT(S)
1. Traffic Study
2. Memorandum of Understanding
Submitted By: Nabil Saba, P.E., Executive Director of Public Works Agency Approved By: Alvaro Nuñez, Acting City Manager
City Council
21 –
2 4/16/2024
Exhibit 1
IBC VISION PLAN 2018 TRAFFIC STUDY UPDATE
ALTERNATIVES ANALYSIS
FINAL
June 2019
Submitted to:
10040 | Prepared by Iteris, Inc.
City Council
21 –
3 4/16/2024
IBC VISION PLAN 2018 TRAFFIC STUDY UPDATE –
ALTERNATIVES ANALYSIS
Final
TABLE OF CONTENTS
Introduction and Summary ...................................................................................................................................6 51 5 n/a
7 1.1 Introduction .................................................................................................................................................6 Alternative 1.................................................................................................................................................9 Alternative 2...............................................................................................................................................10
1.2 1.3
1.4 1.5
Traffic Impacts & Fair Share.......................................................................................................................10 7 n/aEstimated Costs of Alternatives .................................................................................................................12 83 Alternative 2 - Red Hill Avenue Widening (Main Street to MacArthur Boulevard).............................................55 8 8
3.1 Introduction ...............................................................................................................................................55 Alternative 2 Daily Arterial Segment Analysis............................................................................................55 Alternative 2 Peak Hour Link Analysis........................................................................................................65 Alternative 2 Peak Hour Intersection Analysis...........................................................................................65 Alternative 2 Peak Hour Freeway Mainline Analysis .................................................................................74 Alternative 2 Peak Hour Freeway Ramp Analysis ......................................................................................76 Alternative 2 Future Improvements and Mitigations ................................................................................82
3.2 3.3
3.4 3.5
3.6 3.7
18 18
27 29
35 40
40 42
43 47
48 n/a
113
115
117
119
n/a
122
4 Cost Estimates.....................................................................................................................................................87
4.1 Cost Estimates for Mitigation Improvements............................................................................................87 References...........................................................................................................................................................91 Glossary of Transportation Terms.......................................................................................................................92 Appendices..........................................................................................................................................................96 Appendix A: ICU Worksheets ..................................................................................................................................96 Appendix B: HCS Mainline Analysis.........................................................................................................................97 Appendix C: HCS Ramp Analysis..............................................................................................................................98 Appendix D: Fair Share Analysis ..............................................................................................................................99 Appendix E: ICU Worksheet for Mitigation Intersection.......................................................................................100 Appendix F: Intersection Improvement List..........................................................................................................101 Appendix G: Alternative 1 Improvement Concept Plans and Cost Estimates .......................................................102 Appendix H: Alternative 2 Improvement Concept Plans and Cost Estimates .......................................................103 5 6
7 Iteris, Inc. | ii
City Council
21 –
4 4/16/2024
IBC VISION PLAN 2018 TRAFFIC STUDY UPDATE –
ALTERNATIVES ANALYSIS
Final
TABLES
7 7
Table 1.3 - Number of Significantly Impacted Locations in the Study Area Under Alternative 2................................10 Table 1.4- Alternative 2 Improvement Strategies .......................................................................................................10 10 18
20 28
31 35
35 38
38 Table 3.1 –Alternative 2 Daily Arterial LOS..................................................................................................................57 Table 3.2 – Alternative 2 Peak Hour Link Analysis.......................................................................................................65 Table 3.3 – Alternative 2 Peak Hour Intersection LOS.................................................................................................67 Table 3.4 – Alternative 2 Freeway Peak Hour Mainline LOS .......................................................................................75 Table 3.5 – Alternative 2 Peak Hour Freeway Ramp LOS ............................................................................................78 Table 3.6 – Alternative 2 Number of Impacted Locations in the Study Area ..............................................................82 Table 3.7 –Alternative 2 Intersections Significantly Impacted in the Study Area .......................................................82 Table 3.8 – City of Santa Ana Intersection Improvements ..........................................................................................85 Table 3.9– Alternative 2 Freeway Ramp Plan Update Impacts and Fair-Share ...........................................................85 41Table 4.2 – Alternative 2 Cost of Improvements.........................................................................................................90 Iteris, Inc. | iii
City Council
21 –
5 4/16/2024
IBC VISION PLAN 2018 TRAFFIC STUDY UPDATE –
ALTERNATIVES ANALYSIS
Final
FIGURES
Figure 1.2 – Projects Removed From Road Network in Alternative 2 Scenario ............................................................8 6 16Figure 3.1 – Alternative 2 Daily Arterial ADT...............................................................................................................63 Figure 3.2 – Alternative 2 Daily Arterial Deficiencies ..................................................................................................64 Figure 3.3 – Alternative 2 AM Peak Hour Intersection Deficiencies............................................................................72 Figure 3.4 – Alternative 2 PM Peak Hour Intersection Deficiencies............................................................................73 Figure 3.5 – Alternative 2 Freeway AM Peak Hour Deficiencies .................................................................................80 Figure 3.6 – Alternative 2 Freeway PM Peak Hour Deficiencies..................................................................................81 Figure 3.7 – Alternative 2 IBC Vision Study Area Improvement Locations..................................................................84 17 25
26 33
34 37
Iteris, Inc. | v
City Council
21 –
6 4/16/2024
IBC VISION PLAN 2018 TRAFFIC STUDY UPDATE –
ALTERNATIVES ANALYSIS
Final
1 INTRODUCTION AND SUMMARY
1.1 Introduction
This 2018 IBC Vision Plan Two-Year Traffic Study Update (2018 Update) evaluates potential traffic impact locations and documents how development actually occurred over the past two years. The update takes a “snapshot” of the development activity today and considers ambient regional growth to compare with the 2010 and 2015 assumptions. If as a result of actual development, the original traffic impacts are altered or changed, the City has the ability to revise the list of traffic mitigations and IBC fees accordingly within the umbrella of the adopted Vision Plan.
Six alternative land use scenarios are tested in the 2018 IBC Vision Plan Two-Year Traffic Study Update (2018 Update). This supplemental report includes additional analysis for two alternative scenarios in the Buildout condition to test the removal of future highway network improvements. The study area defined in the 2018 Update is also used for this report. The following two scenarios were analyzed:
Alternative 2 – Reflects updated Vision Plan assumptions anticipated to be constructed by Buildout but with the removal of the MPAH widening of Red Hill Avenue from four to six lanes between MacArthur Blvd and Main Street which is currently assumed in the Buildout scenario. Alternative 2 is compared to the Buildout with Update scenario.
The location of these two improvements is illustrated in Figure 1.1 and Figure 1.2.
For both the Alternative 1 and Alternative 2 scenarios, land use is assumed to be the same as Buildout Cumulative Baseline With Update scenario, however, the land use assumptions in the comparison scenario used for Alternative 1 and Alternative 2 are different. Alternative 1 tests the land uses associated with the Vision Plan Update as well as the removal of both highway network improvements while Alternative 2 tests only the removal of the single network improvement and no land use changes.
A summary of the analysis, list of deficient locations and improvements is provided in the following sections.
Detailed analysis of Alternative 1 and Alternative 2 are discussed in Chapter 2 and Chapter 3, respectively.
Iteris, Inc. | 6
City Council
21 –
7 4/16/2024
IBC VISION PLAN 2018 TRAFFIC STUDY UPDATE –
ALTERNATIVES ANALYSIS
Final
Figure 1.2 – Projects Removed From Road Network in Alternative 2 Scenario Iteris, Inc. | 8
City Council
21 –
8 4/16/2024
IBC VISION PLAN 2018 TRAFFIC STUDY UPDATE –
ALTERNATIVES ANALYSIS
Final
1.3 Alternative 2
Alternative 2 tests the removal of the MPAH widening of Red Hill Avenue from four to six lanes between MacArthur Blvd and Main Street. Unlike Alternative 1, the land use scenarios are the same for the Alternative 2 and No Alternative (Buildout with Update) scenarios, which explains why Alternative 2 generates considerably fewer impacts than Alternative 1 as shown in Table 1.3. Alternative 2 generates only two intersection impacts: Flower Street/Segerstrom Avenue in the City of Santa Ana and Flower Street/MacArthur Boulevard in the City of Costa Mesa. The improvement strategies at these locations are shown in Table 1.4
Table 1.3 - Number of Significantly Impacted Locations in the Study Area Under Alternative 2
FACILITY
Arterial Segments
Intersections
Freeway Mainline
Freeway Ramps
Total
ALTERNATIVE 2
0 2
0 1
2 Table 1.4- Alternative 2 Improvement Strategies
INTERSECTION ID # INTERSECTION NAME JURISDICTION IMPROVEMENT STRATEGY ALTERNATIVE 2 IMPACTS AND CUMULATIVE DEFICIENCIES
720
719
Flower Street at MacArthur Boulevard
Flower Street at Segerstrom Avenue
Costa Mesa
Santa Ana
Add EBR
Add WBR
1.4 Traffic Impacts & Fair Share
A fair-share methodology was used to evaluate the financial participation of mitigating IBC Vision impacts.
The following methodology is applied:
For impacts within the City of Irvine, the IBC Vision Plan is fully responsible.
For impacts outside the City of Irvine, the IBC Vision Plan would participate on a fair-share basis.
Alternative 2 tests the removal of the proposed MPAH widening of Red Hill Avenue from four to six lanes between Main Street and MacArthur Boulevard. Both the No Project and With Project scenarios use the same With IBC Vision Plan land use assumptions. Alternative 2 is therefore a test of removal of this improvement from the Orange County Master Plan of Arterial Highways (MPAH). For any improvements identified under this scenario, the City of Irvine is responsible for the full cost of mitigation within the City of Irvine and for a fair share basis for improvements outside the City of Irvine.
All impacts referenced in this study update represent impacts as defined in the City of Irvine’s Traffic Impact Analysis (TIA) Guidelines, adopted August 2004, or for locations outside Irvine, per the performance criteria for each affected agency.
Iteris, Inc. | 10
City Council
21 –
9 4/16/2024
IBC VISION PLAN 2018 TRAFFIC STUDY UPDATE –
ALTERNATIVES ANALYSIS
Final
3 ALTERNATIVE 2 - RED HILL AVENUE WIDENING (MAIN
STREET TO MACARTHUR BOULEVARD)
3.1 Introduction
The 2018 Traffic Study Update Alternative 2 is an analysis to observe the impacts of removing the one remaining MPAH roadway network project within the IBC area; the widening of Red Hill Avenue from four to six lanes between Main Street and MacArthur Boulevard. The location of this project is illustrated in Figure
1.2. For this analysis, the Buildout Cumulative With Update is assumed to be the No Project (Baseline) scenario and the Alternative 2 scenario is the With Project scenario. Traffic analysis is performed using the same methodology employed for the Interim and Buildout year analysis. Any forecast deficiency locations are identified, together with identification of the most effective improvement measures to mitigate them.
The transportation networks are consistent between these two future scenarios except for one exception, the Alternative 2 scenario removes the Red Hill Avenue widening project currently in the MPAH that would widen the arterial to six lanes between Main Street and MacArthur Boulevard. The Alternative 2 scenario assumes Red Hill Avenue in the project area to have the same configuration as existing conditions.
In order to isolate the effects of removing the Red Hill widening to traffic patterns in the study area, the Alternative 2 scenario has the identical land-use as Buildout With Update.
3.2 Alternative 2 Daily Arterial Segment Analysis
The Alternative 2 traffic patterns generally remain very similar to the Buildout With Update scenario traffic patterns. The vast majority of road segments see the same traffic volume in both scenarios. Because the Alternative 2 roadway network does not include the Red Hill Widening project, the largest difference in traffic volume between the two scenarios occurs on Red Hill Avenue. Most notably, ADT on Red Hill Avenue between McGaw Avenue and Sky Park decreases by 1,200 vehicles in Alternative 2 compared to the Buildout Cumulative With Update scenario. The list of arterial segments that are deficient in the Alternative 2 scenario are identical to those of the Buildout Cumulative With Update scenario.
Deficient segments under daily Alternative 2 conditions are shown in Table 3.1 and are:
Campus Drive:
o 879—Campus Drive from Carlson Avenue to University Drive (Irvine) Culver Drive:
o
o
o
o
o
o
726—Culver Drive from I-5 NB Ramps to I-5 SB Ramps (Irvine) 213—Culver Drive from I-5 SB Ramps to Scottsdale Drive (Irvine) 214—Culver Drive from Scottsdale Drive to Walnut Avenue (Irvine) 215—Culver Drive from Walnut Avenue to Deerfield Avenue(Irvine) 217—Culver Drive from Irvine Center Drive to Warner Avenue (Irvine) 219—Culver Drive from Barranca Parkway to Alton Parkway (Irvine) Iteris, Inc. | 55
City Council
21 –
10 4/16/2024
IBC VISION PLAN 2018 TRAFFIC STUDY UPDATE –
ALTERNATIVES ANALYSIS
Final
o
o
o
o
220—Culver Drive from Alton Parkway to Main Street (Irvine) 221—Culver Drive from Main Street to San Leandro (Irvine) 222—Culver Drive from San Leandro to I-405 NB On-Ramp (Irvine) 224—Culver Drive from I-405 SB On-Ramp to Michelson Drive (Irvine)
Harvard Avenue:
o
Jamboree Road:
183—Harvard Avenue from Michelson Drive to University Drive (Irvine) o
o
o
o
133—Jamboree Road from Michelle Drive to Walnut Avenue (Irvine) 144—Jamboree Road from Kelvin Avenue to Main Street (Irvine) 148—Jamboree Road from I-405 SB Ramps to Michelson Drive (Irvine) 149—Jamboree Road from Michelson Drive to Dupont Drive (Irvine) Von Karman Avenue:
o
o
o
o
98—Von Karman Avenue from Barranca parkway to Alton Parkway (Irvine) 100—Von Karman Avenue from Alton Parkway to McGaw Avenue (Irvine) 102—Von Karman Avenue from McGaw Avenue to Anchor(Irvine) 103—Von Karman Avenue from Anchor to Main Street (Irvine)
Bristol Street:
o
o
o
920—Bristol Street SB Red Hill Avenue to Campus Drive (Newport Beach)* 1303—Bristol Street SB from Campus Drive to Birch Street (Newport Beach)* 1305—Bristol Street NB from Birch Street to Campus Drive (Newport Beach)* MacArthur Boulevard:
o
o
953—MacArthur Boulevard from University Drive to Bison Avenue (Newport Beach)* 1301—MacArthur Boulevard from Bison Avenue to Ford Road (Newport Beach)*
Dyer Road:
o
Walnut Avenue:
1326—Dyer Road from SR-55 SB Ramp to SR-55 NB Ramp (Santa Ana)* o 587—Walnut Avenue East of Newport Avenue (Tustin)*
*Deficient locations under daily conditions—no peak hour link analysis required.
Figure 3.1 and Figure 3.2 display the arterial ADT and deficient segments for the Alternative 2 scenario.
Deficient segments in the City of Irvine are evaluated under peak hour conditions in the following section. For Costa Mesa, Newport Beach, and Tustin, arterial segment deficiencies are addressed through intersection improvements. For Santa Ana, deficient segments under daily conditions are typically improved to operate at an acceptable LOS. Impacts and improvements are discussed in Section 3.7.
Iteris, Inc. | 56
City Council
21 –
11 4/16/2024
IBC VISION PLAN 2018 TRAFFIC STUDY UPDATE –
ALTERNATIVES ANALYSIS
Final
Table 3.1 –Alternative 2 Daily Arterial LOS
BUILDOUT CUMULATIVE ALTERNATIVE 2WITH UPDATE
ID ARTERIAL SEGMENT LIMITS
2725 Anton Blvd
2721 Baker St
2729 Baker St
1294 Baker St
1468 Baker St
Bristol St to Sunflower Ave
Bear St to Bristol St
Bristol St to SR 55 SB Ramps
SR 55 SB to SR 55 NB
CM
CM
CM
CM
CM
CM
CM
CM
CM
CM
CM
CM
CM
CM
CM
CM
CM
CM
CM
CM
CM
CM
CM
CM
CM
CM
CM
CM
CM
CM
CM
CM
CM
CM
CM
CM
Irv
4D
6D
6D
6D
6D
6D
6D
6D
6D
6D
6D
9D+1 AUX
8D
6D
6D
6D
6D
4D
4D
4D
4D
4D
6D
2U
2U
4D
4D
4D
4D
4D
4D
4D
4D
4D
4D
4D
4D
4D
4D
6D
6D
6D
6D
6D
8D
7D
7D
7D
21,700 0.57
0.53 0.60
0.46 0.26
0.09 0.55
0.73 0.81
0.80 0.84
0.78 0.87
0.80 0.65
0.48 0.36
0.63 0.33
0.36 0.28
0.17 0.47
0.49 0.49
0.38 0.24
0.52 0.46
0.34 0.15
0.55 0.51
0.46 0.24
0.33 0.94
0.70 0.70
0.48 0.46
0.35 0.38
0.51 0.61
0.77 0.74
0.79 A
A
A
A
A
A
A
C
D
C
D
C
D
C
B
A
A
B
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
E
21,600 0.57
0.52 0.60
0.46 0.26
0.09 0.55
0.73 0.81
0.80 0.84
0.78 0.87
0.81 0.65
0.48 0.36
0.63 0.33
0.36 0.28
0.17 0.47
0.49 0.49
0.38 0.24
0.52 0.45
0.34 0.15
0.54 0.50
0.45 0.24
0.33 0.94
0.70 0.70
0.48 0.46
0.35 0.38
0.51 0.61
0.77 0.74
0.79 A
A
A
A
A
A
A
C
D
C
D
C
D
D
B
A
A
B
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
E
29,500
33,500
26,000
14,600
5,000
29,400
33,400
25,900
14,500
5,000
SR 55 NB to Red Hill Ave
1469 Baker St
2723 Bear St
Red Hill Ave to Airway Ave
Paularino Ave to Baker St
Segerstrom Ave to West Alton Ave
West Alton Ave to MacArthur Blvd
MacArthur Blvd to Sunflower Ave
Sunflower Ave to Anton Blvd
Anton Blvd to I-405 NB Ramps
I-405 NB Ramps to I-405 SB Ramps
I-405 SB Ramps to Paularino Ave
Paularino Ave to Baker St
Baker St to SR 55
30,900
41,000
45,600
44,800
46,800
66,100
65,100
45,000
36,500
26,700
20,400
24,100
12,500
13,800
10,700
6,400
26,500
6,100
6,100
14,300
9,300
19,700
17,300
13,100
5,700
31,000
41,000
45,600
44,900
46,800
66,100
65,100
45,200
36,500
26,800
20,400
24,100
12,500
13,800
10,700
6,500
26,100
6,100
6,100
14,300
9,200
19,700
17,200
13,000
5,800
2733 Bristol St
2737 Bristol St
2738 Bristol St
2727 Bristol St
2728 Bristol St
2751 Bristol St
2745 Bristol St
2732 Bristol St
2730 Bristol St
1888 Bristol St
2793 Del Mar Ave
2791 Del Mar Ave
2772 Flower St
2804 Flower St
2760 Flower St
2756 Main St
2785 Mesa Drive
2783 Mesa Drive
2779 Mesa Drive
2742 Paularino Ave
2746 Paularino Ave
1291 Paularino Ave
1344 Paularino Ave
1342 Paularino Ave
SR-55 to Red Hill Ave
Newport Blvd SB to Newport Blvd NB
Newport Blvd to Santa Ana Ave
Segerstrom Ave to MacArthur Blvd
MacArthur Blvd to Sunflower Ave
Sunflower Ave to Anton Blvd
Sunflower Ave to SR-55
Newport Blvd SB to Newport Blvd NB
Newport Blvd NB to Santa Ana Ave
Irvine Ave to Birch St
Bear St to Bristol St
Bristol St to SR-55 SB
SR-55 SB to SR-55 NB
SR-55 NB to Red Hill Ave
Red Hill Ave to Airway Ave
Main St to Paularino Ave
Paularino Ave to Baker St
Baker St to Bristol St
39 Red Hill Ave a 21,000
19,300
17,300
9,200
20,600
18,900
17,200
9,200
1340 Red Hill Ave
40 41
Red Hill Ave
Santa Ana Ave Mesa Drive to Bristol St
2769 University Drive Santa Ana Ave to Irvine Ave
Daimler St to Red Hill Ave
Red Hill Ave to Von Karman Ave
Von Karman Ave to Jamboree Rd
Jamboree Rd to Murphy Ave
Murphy Ave to Harvard Ave
Harvard Ave to Paseo Westpark
Paseo Westpark to San Marino
San Marino to Culver Drive
12,400
30,000
22,300
22,300
25,800
24,800
19,000
20,500
27,800
43,800
48,700
46,600
50,000
12,400
30,100
22,300
22,300
25,700
24,800
18,900
20,500
27,800
43,900
48,600
46,500
49,900
770
776
778
779
780
781
Alton Pkwy
Alton Pkwy
Alton Pkwy
Alton Pkwy
Alton Pkwy
Alton Pkwy
a
a
a
a
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
B
B
A
A
A
A
A
B
C
C
C
B
B
A
A
A
A
A
B
C
C
C
1378 Alton Pkwy
783
735
736
739
740
Alton Pkwy
Barranca Pkwy (Dyer Rd) Pullman to Red Hill Ave
Barranca Pkwy
Barranca Pkwy
Barranca Pkwy
Red Hill Ave to Armstrong
Armstrong to Von Karman Ave
Von Karman Ave to Jamboree Rd
a
a
a
Irv
Irv
Irv
Iteris, Inc. | 57
City Council
21 –
12 4/16/2024
IBC VISION PLAN 2018 TRAFFIC STUDY UPDATE –
ALTERNATIVES ANALYSIS
Final
BUILDOUT CUMULATIVE ALTERNATIVE 2WITH UPDATE
ID ARTERIAL SEGMENT LIMITS
743 Barranca Pkwy Jamboree Rd to Construction Circle
Construction Circle to Harvard Ave
Harvard Ave to Paseo Westpark
Paseo Westpark to Santa Rosa
Santa Rosa to Culver Drive
Jamboree Rd to Marketplace
Marketplace to El Camino Real
El Camino Real to Rubicon
a
a
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
6D
6D
6D
6D
6D
4D
4D
4D
4D
6U
4D
4D
4D
4D
4D
4D
35,400 0.66
0.53 0.50
0.57 0.57
0.72 0.72
0.70 0.78
0.30 0.51
0.48 0.49
0.82 0.92
0.31 0.96
1.10 0.98
0.92 0.79
0.92 0.89
1.03 0.97
0.97 1.01
1.08 0.80
0.73 0.76
0.20 0.39
0.46 0.46
0.41 0.51
0.56 0.64
0.60 0.63
0.69 0.84
0.84 0.85
1.65 0.57
0.64 0.67
0.98 B
A
A
A
A
C
C
B
C
A
A
A
A
D
E
A
E
F
E
E
C
E
D
F
E
E
35,300 0.65
0.52 0.50
0.57 0.57
0.72 0.72
0.70 0.78
0.30 0.51
0.48 0.49
0.82 0.92
0.31 0.96
1.10 0.98
0.92 0.79
0.92 0.89
1.03 0.97
0.97 1.02
1.08 0.80
0.73 0.76
0.20 0.39
0.46 0.46
0.41 0.51
0.56 0.64
0.60 0.63
0.69 0.84
0.84 0.85
1.65 0.57
0.64 0.67
0.98 B
A
A
A
A
C
C
B
C
A
A
A
A
D
E
A
E
F
E
E
C
E
D
F
E
E
744
745
747
748
538
Barranca Pkwy
Barranca Pkwy
Barranca Pkwy
Barranca Pky
Bryan Ave
28,400
27,200
31,000
30,800
23,200
23,100
22,300
25,100
16,400
16,300
15,500
15,700
26,300
29,400
10,000
60,600
59,300
52,700
49,600
46,500
49,600
47,800
55,400
52,500
52,600
54,800
58,200
43,000
39,200
24,200
6,500
10,900
12,900
13,000
13,100
16,300
18,000
20,600
19,100
20,100
22,200
27,000
27,000
27,200
21,500
30,700
34,600
48,500
66,300
28,300
27,100
31,000
30,800
23,200
23,100
22,300
25,100
16,400
16,400
15,500
15,700
26,300
29,400
10,000
60,600
59,300
52,700
49,600
46,400
49,600
47,800
55,400
52,600
52,600
54,900
58,200
43,000
39,200
24,200
6,500
10,900
12,900
13,000
13,100
16,200
18,000
20,600
19,100
20,100
22,200
27,000
27,000
27,200
21,500
30,700
34,700
48,500
66,300
1812 Bryan Ave
539
540
869
870
871
872
877
879
166
726
213
214
215
216
217
218
219
220
221
222
224
225
226
Bryan Ave
Bryan Ave Rubicon to Culver
MacArthur Blvd to MartinCampus Drive
Campus Drive
Campus Drive
Campus Drive
Campus Drive
Campus Drive
Carlson Ave
Culver Drive
Culver Drive
Culver Drive
Culver Drive
Culver Drive
Culver Drive
Culver Drive
Culver Drive
Culver Drive
Culver Drive
Culver Drive
Culver Drive
Culver Drive
Culver Drive
a
a
a
a
a
Martin to Von Karman Ave
Von Karman Ave to Teller Ave
Teller Ave to Jamboree Rd
Jamboree Rd to Carlson Ave
Carlson Ave to University
Michelson Drive to Campus Drive
I-5 NB Ramps to I-5 SB Ramps
I-5 SB Ramps to Scottsdale Drive
Scottsdale Drive to Walnut Ave
Walnut Ave to Deerfield Ave
Deerfield Ave to Irvine Center Drive
Irvine Center Drive to Warner Ave
Warner Ave to Barranca Pkwy
Barranca Pkwy to Alton Pkwy
Alton Pkwy to Main St
a
7D
6D
6D
6D
Maj6D+ 1AUX
6D
6D
6D
6D
6D
6D
6D
6D
6D
4D
4D
4U
4U
4U
4D
4D
4D
4D
4D
4D
4D
4D
4D
4D
2U
6D
6D
8D
Main St to San Leandro
San Leandro to I-405 NB On-Ramp
I-405 SB Ramps to Michelson Drive
Michelson Drive to Sandburg Way
Sandburg Way to University Drive
Jamboree Rd to Alliance
MacArthur Blvd to Jamboree Rd
Walnut Ave to Poplar St
Poplar St to Deerfield Ave
Deerfield Ave to Irvine Center Drive
Irvine Center Drive to Paseo Westpark
Paseo Westpark to Warner Ave
Warner to Barranca Pkwy
Barranca Pkwy to San Juan
San Juan to San Leon
San Leon to Alton Pkwy
Alton Pkwy to San Marino
San Marino to Main St
Main St to Coronado
Coronado to Michelson Drive
Michelson Drive to University Drive
Harvard Ave to Hearthstone
Hearthstone to Culver Drive
Bryan Ave to El Camino
F
F
F
F
C
C
C
A
A
A
A
A
A
A
B
A
B
B
D
D
D
F
C
C
C
A
A
A
A
A
A
A
B
A
B
B
D
D
D
F
1206 El Camino Real
169
170
Fairchild Rd
Harvard Ave
3040 Harvard Ave
171
172
174
175
177
Harvard Ave
Harvard Ave
Harvard Ave
Harvard Ave
Harvard Ave
2829 Harvard Ave
178
179
180
181
182
183
675
676
129
130
Harvard Ave
Harvard Ave
Harvard Ave
Harvard Ave
Harvard Ave
Harvard Ave
Irvine Center Drive
Irvine Center Drive
Jamboree Rd
Jamboree Rd
b
b
b
b
A
B
B
E
A
B
B
EEl Camino Real to I-5 NB Ramps Maj7D+ 1AUX
Iteris, Inc. | 58
City Council
21 –
13 4/16/2024
IBC VISION PLAN 2018 TRAFFIC STUDY UPDATE –
ALTERNATIVES ANALYSIS
Final
BUILDOUT CUMULATIVE ALTERNATIVE 2WITH UPDATE
ID ARTERIAL SEGMENT LIMITS
958 Jamboree Rd I-5 NB Ramps to I-5 SB Ramps
I-5 SB Ramps to Michelle Drive
Michelle Drive to Walnut Ave
Walnut Ave to Edinger Ave (& Frontage Rd)
Edinger Ave to Warner Ave
Warner Ave to Barranca Pkwy
Barranca Pkwy to Beckman Ave
Beckman Ave to Alton Pkwy
Alton Pkwy to McGaw Ave
McGaw Ave to Kelvin Ave
b
b
b
b
b
a,b
a,b
a,b
a,b
a,b
a,b
b
a,b
a,b
a,b
b
b
b
a,b
a
a
a
a
a
a
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
8D
8D
5D
Exp8
Exp8
Exp8
8D
8D
62,600 0.87
0.80 1.69
0.47 0.48
0.37 0.81
0.88 0.93
0.86 1.04
0.99 1.13
1.03 0.84
0.94 0.78
0.68 0.80
0.58 0.45
0.45 0.75
0.90 0.68
0.66 0.99
0.99 0.51
0.52 0.49
0.52 0.65
0.52 0.49
0.41 0.45
0.41 0.41
0.25 0.39
0.33 0.10
0.56 0.50
0.75 0.55
0.72 0.77
0.79 D
C
F
A
A
A
D
D
E
D
F
E
F
F
62,500 0.87
0.80 1.69
0.47 0.48
0.37 0.81
0.88 0.93
0.86 1.04
0.99 1.13
1.03 0.84
0.94 0.78
0.68 0.80
0.59 0.45
0.45 0.75
0.90 0.68
0.66 0.99
0.99 0.51
0.52 0.49
0.52 0.65
0.52 0.49
0.41 0.46
0.41 0.41
0.25 0.39
0.33 0.10
0.56 0.51
0.75 0.55
0.72 0.77
0.79 D
C
F
A
A
A
D
D
E
D
F
E
F
F
131
133
135
136
137
138
Jamboree Rd
Jamboree Rd
Jamboree Rd
Jamboree Rd
Jamboree Rd
Jamboree Rd
57,900
72,600
84,900
85,800
66,700
58,500
63,600
66,800
62,000
74,700
80,400
91,900
65,200
53,100
50,900
49,200
43,100
43,200
36,700
28,400
28,100
60,800
68,600
49,200
47,200
53,500
53,300
27,700
27,900
26,500
35,200
38,000
28,200
26,700
24,200
24,500
13,100
13,200
7,900
57,900
72,700
84,900
85,800
66,700
58,500
63,500
66,800
62,000
74,700
80,400
91,900
65,100
53,000
50,900
49,100
43,100
43,200
37,100
28,400
28,100
61,000
68,700
49,300
47,300
53,500
53,300
27,500
28,200
26,700
35,300
38,100
28,200
26,700
24,200
24,600
13,100
13,200
7,900
1503 Jamboree Rd
140
142
144
145
148
149
150
151
152
154
155
814
815
Jamboree Rd
Jamboree Rd
Jamboree Rd
Jamboree Rd
Jamboree Rd
Jamboree Rd
Jamboree Rd
Jamboree Rd
Jamboree Rd
Jamboree Rd
Jamboree Rd
MacArthur Blvd
MacArthur Blvd
8D
8D
8DKelvin Ave to Main St
Main St to I-405 NB Ramps
I-405 SB Ramps to Michelson Drive
Michelson Drive to Dupont Drive
Dupont Drive to Campus Drive
Campus Drive to Birch St
Maj8D+ 2AUX
Maj8D+ 2AUX
7D
7D
6D
7D
7D
6D
7D
7D
D
E
D
E
Birch St to Fairchild Rd C
B
C
A
A
A
C
D
B
B
E
C
B
C
A
A
A
C
D
B
B
E
Fairchild Rd to Koll Center
Koll Center to MacArthur Blvd
Fitch to Red Hill Ave
Red Hill Ave to Skypark Blvd
Skypark Blvd to Main St1524 MacArthur Blvd
60 62
63 7D
MacArthur Blvd
MacArthur Blvd
MacArthur Blvd
MacArthur Blvd
MacArthur Blvd
MacArthur Blvd
Main St
Main St
Main St
Main St
Main St
Main St
Main St
Main St
Main St
Main St
Main St
Main St to I-405 NB Ramps
I-405 SB Ramps to Michelson Dr
Michelson Drive to Douglass
Douglas to Campus Drive
Jamboree Rd to Fairchild Rd
Fairchild Rd to University Drive
McDurmott to Red Hill Ave
Red Hill Ave to Executive Park
Executive Park to MacArthur Blvd
MacArthur Blvd to Mercantile
Gillette Ave to Von Karman Ave
Von Karman Ave to Cartwright
Siglo to Jamboree Rd
Maj8D+ 2AUX
Maj8D+ 1AUX
8D
8D
6D
6D
6D
6D
6D
64 916
917
817
818
819
820
821
822
823
824
825
826
827
a,b
b
a
a
a
a
a
a
a
E E
A
A
A
A
B
A
A
A
A
A
A
A
A
A
A
A
A
C
A
C
C
C
A
A
A
A
B
A
A
A
A
A
A
A
A
A
A
A
A
C
A
C
C
C
Maj7D+ 1AUX
Maj6D+ 1AUX
6D
6D
Jamboree Rd to Union
Veneto to Harvard Ave
a Maj6D+ 1AUX
6D
4D
4D
4D
4D
4D
4D
5D
4D
Harvard Ave to San Mateo
Paseo Westpark to Culver Drive
Daimler St to Red Hill Ave
Red Hill Ave to Von Karman Ave
Von Karman Ave to Jamboree Rd
Jamboree Rd to Murphy Ave
MacArthur Blvd to Dupont Drive
Bixby to Von Karman Ave
Von Karman Ave to Obsidian
Teller Ave to Jamboree Rd
Jamboree Rd to Carlson Ave
Carlson Ave to Prince
1507 McGaw Ave
808
810
a
a
a
McGaw Ave
McGaw Ave
12,600
10,600
3,200
24,200
16,100
27,100
23,800
28,700
27,800
25,400
12,500
10,600
3,200
24,200
16,200
27,100
23,800
28,700
27,800
25,400
1449 McGaw Ave
840
843
844
845
846
847
848
Michelson Drive a
a
a
a
a
Michelson Drive
Michelson Drive
Michelson Drive
Michelson Drive
Michelson Drive
Michelson Drive
Prim4D+ 1AUX
5D
Prim4D+ 2AUX
Prim4D+ 1AUX
4DRiparian View to Harvard Ave
Iteris, Inc. | 59
City Council
21 –
14 4/16/2024
IBC VISION PLAN 2018 TRAFFIC STUDY UPDATE –
ALTERNATIVES ANALYSIS
Final
BUILDOUT CUMULATIVE ALTERNATIVE 2WITH UPDATE
ID ARTERIAL SEGMENT LIMITS
1346 Michelson Drive Harvard Ave to Parkside Drive
Parkside Drive to Culver Drive
Dyer/Barranca Pkwy to Deere Ave
Deere Ave to Alton Pkwy
Alton Pkwy to McGaw Ave
McGaw Ave to MacArthur Blvd
MacArthur Blvd to Sky Park
Sky Park to Main St
MacArthur Blvd to California Ave
California Ave to Mesa Rd
Mesa Rd to Campus Drive
Campus Drive to Harvard Ave
Harvard Ave to San Joaquin Hills Rd
San Joaquin Hills Rd to Culver Drive
Barranca Pkwy to Alton Pkwy
Alton Pkwy to McGaw Ave
McGaw Ave to Anchor
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
NB
NB
NB
NB
NB
NB
NB
NB
NB
NB
NB
NB
NB
NB
NB
NB
NB
NB
NB
4D
4D
6D
6D
6D
6D
4D
4D
6D
6D
6D
6D
6D
6D
4D
4D
19,400 0.61
0.61 0.69
0.70 0.67
0.85 0.70
0.55 0.65
0.70 0.71
0.63 0.59
0.58 1.30
1.13 1.02
1.03 0.94
1.00 0.81
0.78 0.77
0.66 0.36
0.45 0.61
0.63 0.56
0.42 0.43
0.57 0.68
0.40 0.58
0.26 0.11
0.34 1.84
0.58 0.91
1.07 0.88
0.59 0.64
0.24 0.56
0.44 0.76
0.62 B
B
B
B
B
D
B
A
B
B
C
B
A
A
F
19,400 0.61
0.61 0.69
0.69 0.67
0.84 0.65
0.52 0.65
0.70 0.71
0.63 0.59
0.58 1.30
1.13 1.02
1.04 0.94
1.00 0.81
0.78 0.77
0.66 0.36
0.45 0.61
0.63 0.56
0.42 0.42
0.57 0.68
0.40 0.58
0.26 0.11
0.34 1.84
0.58 0.92
1.07 0.88
0.59 0.64
0.24 0.56
0.44 0.76
0.62 B
B
B
B
B
D
B
A
B
B
C
B
A
A
F
850
31 Michelson Drive
Red Hill Ave
19,500
37,500
37,600
36,400
45,700
22,300
17,700
35,300
37,600
38,100
34,000
31,700
31,500
41,700
36,100
32,700
33,100
33,700
36,100
25,900
25,100
24,600
23,800
21,300
21,300
19,500
20,100
17,900
13,500
13,700
22,900
27,100
15,900
23,300
10,200
6,100
19,500
37,400
37,500
36,000
45,200
20,800
16,500
35,300
37,700
38,100
34,000
31,700
31,500
41,600
36,100
32,700
33,200
33,700
36,100
25,900
25,100
24,600
23,800
21,300
21,300
19,500
20,100
17,900
13,500
13,600
22,900
27,100
15,800
23,300
10,200
6,100
a
a
a
a
a
a
32 Red Hill Ave
33 Red Hill Ave
36 Red Hill Ave
37 Red Hill Ave
38 Red Hill Ave
189
188
187
880
881
882
98 100
102
103
104
107
108
110
111
594
593
595
596
597
728
729
732
University Drive
University Drive
University Drive
University Drive
University Drive
University Drive
Von Karman Ave
Von Karman Ave
Von Karman Ave
Von Karman Ave
Von Karman Ave
Von Karman Ave
Von Karman Ave
Von Karman Ave
Von Karman Ave
Walnut Ave
Walnut Ave
Walnut Ave
Walnut Ave
Walnut Ave
Warner Ave
Warner Ave
Warner Ave
a
a
a
a
a
a
a
a
a
F
F
F
E
F
F
F
E
4D
4DAnchor to Main St
Main St to Morse Ave
Quartz to Michelson Drive
Michelson Diver to Dupont Drive
Dupont Drive to Martin
Prim4D+ 1AUX
Prim4D+ 1AUX E E
4D
4D
4D
D
C
C
B
A
A
B
B
A
A
A
A
B
A
A
A
A
A
F
D
C
C
B
A
A
B
B
A
A
A
A
B
A
A
A
A
A
F
Martin to Campus Drive
Myford to Jamboree SB Ramp
Jamboree Rd to Peters Canyon
Peters Canyon to Harvard Ave
Harvard Ave to Mall St
Prim4D+ 1AUX
Maj6D+ 1AUX
Prim5D+ 1AUX
4D
4D
4D
4D
4D
4D
4D
4D
4D
4D
6D
4D
2D
3D
3D
3D
4D
3D
6D
4D
6D
6D
4D
6D
Mall St to Culver Drive
Construction N to Harvard Ave
Harvard Ave to Paseo Westpark
Santa Ynez to Culver Drive
Mesa Drive to Bristol St SB
Bristol St SB to Bristol St NB
East of MacArthur Blvd
1223 Birch St
1314 Birch St
874
69 875
Birch St
Birch St
Birch St
West of MacArthur Blvd
East of Von Karman Ave
1705 Bison Ave
1773 Bison Ave
Jamboree Rd to MacArthur Blvd
MacArthur Blvd to SR-73
Red Hill Ave to Campus Drive
Campus Drive to Red Hill Ave
Campus Drive to Birch St
Birch St to Campus Drive
West of Jamboree Rd
13,600
33,100
16,900
26,500
31,100
35,400
17,000
37,300
9,500
32,300
25,800
30,200
36,000
13,500
33,100
16,900
26,600
31,100
35,400
17,000
37,300
9,500
32,300
25,800
30,200
36,000
920 Bristol St SB
1310 Bristol St NB
1303 Bristol St SB
1305 Bristol St NB
1312 Bristol St SB
1580 Bristol St NB
A
E
F
A
E
F
D
A
B
A
A
A
C
B
D
A
B
A
A
A
C
B
West of Jamboree Rd
66 Campus Drive Bristol St NB to MacArthur Blvd
Jamboree Rd to MacArthur Blvd
Bristol St NB to Bristol St SB
Bristol St SB to Mesa Drive
S of University Drive
1778 Ford Rd
1304 Irvine Ave
67 2768 Irvine Ave
156 Jamboree Rd
Irvine Ave
S of MacArthur Blvd
Iteris, Inc. | 60
City Council
21 –
15 4/16/2024
IBC VISION PLAN 2018 TRAFFIC STUDY UPDATE –
ALTERNATIVES ANALYSIS
Final
BUILDOUT CUMULATIVE ALTERNATIVE 2WITH UPDATE
ID ARTERIAL SEGMENT LIMITS
1856 Jamboree Rd Bristol St SB to Bristol St NB
S of Bristol St
University Drive to Bison Ave
Bison Ave to Ford Rd
Campus Drive to Birch St
S of Birch St
Von Karman Ave to Jamboree Rd
University Drive to Bison Ave
Bison Ave to Ford Rd
East of Irvine Ave
Jamboree Rd to MacArthur Blvd
S of Campus Drive
S of Birch St
Main St to Halladay St
Halladay St to SR-55 SB
SR-55 SB to SR-55 NB
SR-55 NB to Pullman St
Warner Ave to Hotel Terrace Drive
Hotel Terrace Drive to SR-55 NB
Dyer Rd to Alton Ave
Alton Ave to McGaw Ave(Columbine)
Flower St to Main St
NB
NB
NB
NB
NB
NB
NB
NB
NB
NB
NB
NB
NB
SA
SA
SA
SA
SA
SA
SA
SA
SA
SA
SA
SA
SA
SA
SA
SA
SA
SA
SA/CM
SA/CM
SA/CM
Tus
Tus
Tus
Tus
Tus
Tus
Tus
Tus
Tus
Tus
Tus
Tus
6D
8D
6D
6D
8D
6D
6D
6D
8D
2U
5D
4D
4D
6D
6D
6D
8D
6D
6D
4D
2U
6D
6D
6D
6D
6D
6D
4U
4D
4D
6D
6D
6D
6D
2U
4U
4D
4D
4D
6D
6D
6D
4D
4D
4D
4D
6D
42,900 0.74
0.66 0.72
0.56 0.37
0.40 0.40
1.23 1.17
0.52 0.28
0.45 0.37
0.61 0.67
1.06 0.83
0.51 0.51
0.25 0.28
0.74 0.67
0.61 0.51
0.53 0.40
0.49 0.74
0.77 0.45
0.40 0.37
0.49 0.52
0.72 0.48
0.49 0.61
0.96 0.63
0.57 0.38
0.25 0.29
0.52 0.56
C
B
C
A
A
A
A
F
42,900 0.74
0.66 0.72
0.56 0.37
0.40 0.40
1.23 1.17
0.52 0.28
0.45 0.37
0.61 0.67
1.06 0.83
0.51 0.51
0.25 0.29
0.75 0.67
0.61 0.51
0.53 0.40
0.49 0.74
0.77 0.45
0.40 0.37
0.48 0.52
0.73 0.48
0.49 0.61
0.96 0.63
0.57 0.38
0.25 0.29
0.52 0.56
C
B
C
A
A
A
A
F
157
159
Jamboree Rd
Jamboree Rd
45,100
42,000
32,200
25,400
23,000
23,100
71,200
79,400
5,200
13,900
18,000
14,900
34,200
37,700
59,900
61,900
28,700
28,500
9,200
45,100
42,000
32,200
25,400
23,000
23,100
71,300
79,500
5,200
13,900
18,000
14,900
34,200
37,700
59,900
61,900
28,700
28,500
9,200
1777 Jamboree Rd
73 75
914
953
MacArthur Blvd
MacArthur Blvd
MacArthur Blvd
MacArthur Blvd b
b1301 MacArthur Blvd
2767 University Drive
1774 University Drive
F F
A
A
A
A
B
B
F
A
A
A
A
B
B
F
112
113
Von Karman Ave
Von Karman Ave
2795 Dyer Rd
2799 Dyer Rd
1326 Dyer Rd
734 Dyer Rd D
A
A
A
A
C
B
B
A
A
A
A
C
C
A
A
A
A
A
C
A
A
B
E
D
A
A
A
A
C
B
B
A
A
A
A
C
C
A
A
A
A
A
C
A
A
B
E
2764 Grand Ave
2806 Grand Ave
2800 Halladay St
2822 Halladay St
2805 MacArthur Blvd
1884 MacArthur Blvd
2796 Main St
2826 Main St
2809 Main St
2811 Main St
2823 McGaw Ave (Alton)
2736 Segerstrom Ave
2771 Segerstrom Ave
2763 Warner Ave
2761 Sunflower Ave
2759 Sunflower Ave
2757 Sunflower Ave
1198 Browning Ave
3,500 3,600
41,800
38,000
34,300
28,600
29,900
22,400
11,700
27,600
29,000
25,300
22,400
20,900
27,400
6,500
18,100
18,000
18,500
22,700
53,800
35,500
32,000
14,300
9,300
42,000
38,000
34,400
28,700
30,000
22,600
11,800
27,600
29,000
25,400
22,300
20,800
27,100
6,500
18,200
18,000
18,500
22,700
53,800
35,500
32,000
14,300
9,300
Main St to SR-55 SB
Segerstrom Ave to Alton Ave
Alton Ave to McGaw Ave(Columbine)
McGaw(Columbine) to MacArthur Blvd
MacArthur Blvd to Sunflower Ave
Main St to Halladay St
Bristol St to Flower St
Flower St to Main St
Grand Ave to SR-55
Bristol St to Flower St
Flower St to Anton Blvd
Anton Blvd to Main St
Walnut Ave to I-5
534
535
536
537
44 Bryan Ave
Bryan Ave
Bryan Ave
Bryan Ave
Edinger Ave
Edinger Ave
Edinger Ave
Newport Blvd to Red Hill Ave
Red Hill Ave to Browning
Browning Ave to Tustin Ranch Rd
Tustin Ranch Rd to Jamboree Rd
West of Newport Ave
Newport Ave to Red Hill Ave
Red Hill Ave and Tustin Ranch Rd
Newport Ave to Red Hill Ave
Red Hill Ave to Browning Ave
Browning Ave to Tustin Ranch Rd
Tustin Ranch Rd to Jamboree Rd
b
b
b
663
665
B
A
A
A
A
A
A
B
A
A
A
A
A
A
1202 El Camino Real
938 El Camino Real
1740 El Camino Real
1205 El Camino Real
Irvine Center Drive
10,700
19,500
31,600
10,700
19,600
31,600672 Tustin Ranch Rd to Jamboree Rd b
b
Tus(Edinger)
674 Irvine Center Drive Jamboree Rd to Harvard Ave
Newport Ave to Red Hill Ave
Tus
Tus
6D
2U
30,600
7,400
0.54 0.59
A
A
30,600
7,400
0.54 0.59
A
A2777 Mitchell Ave
Iteris, Inc. | 61
City Council
21 –
16 4/16/2024
IBC VISION PLAN 2018 TRAFFIC STUDY UPDATE –
ALTERNATIVES ANALYSIS
Final
BUILDOUT CUMULATIVE ALTERNATIVE 2WITH UPDATE
ID ARTERIAL SEGMENT LIMITS
2775 Mitchell Ave Red Hill Ave to Browning Ave
El Camino Real to I-5
I-5 to Mitchell Ave
Mitchell Ave to McFadden Ave
N of Sycamore Ave
Tus
Tus
Tus
Tus
Tus
Tus
Tus
Tus
Tus
Tus
Tus
Tus
Tus
Tus
Tus
Tus
Tus
Tus
Tus
Tus
Tus
Tus
Tus
Tus
Tus
Tus
Tus
Tus
Tus
Tus
Tus
Tus
Tus
Tus
Tus
2U
6D
6D
6D
6D
6D
2U
2U
6D
6D
6D
6D
6D
6D
6D
6D
6D
7D
4D
4D
6D
6D
6D
6D
6D
6D
4D
4D
4D
4D
4U
4D
4D
4D
6D
5,800 0.46
0.89 0.75
0.70 0.41
0.55 0.46
0.54 0.68
0.64 0.76
0.56 0.54
0.54 0.60
0.66 0.68
0.67 0.23
0.27 0.79
0.81 0.58
0.60 0.74
0.53 0.28
0.48 0.31
0.33 0.92
0.52 0.61
0.57 0.40
A
D
C
B
A
A
A
A
B
B
C
A
A
A
A
B
B
B
A
A
C
D
A
A
C
A
A
A
A
A
E
5,800 0.46
0.89 0.75
0.70 0.41
0.55 0.46
0.54 0.68
0.64 0.76
0.56 0.54
0.54 0.60
0.66 0.68
0.66 0.23
0.27 0.79
0.81 0.58
0.60 0.74
0.53 0.28
0.48 0.31
0.33 0.92
0.51 0.61
0.57 0.40
A
D
C
B
A
A
A
A
B
B
C
A
A
A
A
B
B
B
A
A
C
D
A
A
C
A
A
A
A
A
E
6 7
48 49
Newport Ave
Newport Ave
Newport Ave
Newport Ave
50,200
42,200
39,400
23,200
31,000
5,800
50,200
42,100
39,300
23,100
31,000
5,800
1585 Newport Ave
1351 Nisson Rd
Valencia Ave to Edinger Ave
Newport Ave to Red Hill Ave
Red Hill Ave to Browning Ave
I-5 NB Ramps to El Camino Real
I-5 SB Ramps to I-5 NB Ramps
Nisson Rd to I-5 SB Ramps
Nisson Rd to Mitchell Ave
Mitchell Ave to Walnut Ave
Walnut Ave to Sycamore Ave
Sycamore Ave to Edinger Ave
Edinger Ave to Valencia Ave
Valencia Ave to Warner Ave
Warner Ave to Barranca Pkwy/Dyer
SR-55 NB to Newport Ave
Newport Ave to Red Hill Ave
N of I-5
939 Nisson Rd 6,700 6,700
1355 Red Hill Ave
1354 Red Hill Ave
38,400
35,800
42,900
31,600
30,500
30,300
33,900
37,200
38,500
43,700
8,500
10,100
44,300
45,400
32,900
33,900
41,500
29,600
10,400
18,100
11,500
12,300
22,900
19,400
22,900
21,300
22,400
38,500
35,800
42,900
31,600
30,500
30,300
33,900
37,200
38,500
43,600
8,500
10,100
44,200
45,400
32,800
33,800
41,500
29,600
10,400
18,100
11,500
12,300
23,000
19,300
22,800
21,300
22,400
21 Red Hill Ave
1353 Red Hill Ave
22 23
24 25
26 30
Red Hill Ave
Red Hill Ave
Red Hill Ave
Red Hill Ave
Red Hill Ave
Red Hill Ave
1363 Sycamore Ave
1920 Sycamore Ave
85 86
Tustin Ranch Rd
Tustin Ranch Rd I-5 to Walnut Ave
2168 Tustin Ranch Road
2073 Tustin Ranch Road
2071 Tustin Ranch Road
2070 Tustin Ranch Road
2173 Valencia Ave
Walnut Avenue to Valencia Avenue
Valencia Avenue to Warner Avenue
Warner Avenue to Park Avenue
Park Avenue to Barranca Parkway
Newport Ave to Red Hill Ave
Red Hill Avenue to Armstrong Avenue
Armstrong Avenue to Kensington Park
Kensington Park to Tustin Ranch Road
East of Newport Ave
East of Red Hill Ave
West of Tustin Ranch Rd
Franklin Ave to Myford Rd
SR-55 to Red Hill Ave
632 Valencia Avenue
2844 Valencia Avenue
2842 Valencia Avenue
587
589
590
Walnut Ave
Walnut Ave
Walnut Ave
A
B
A
A
A
B
A
A
1366 Walnut Ave
1478 Warner Ave
a Intersection within Irvine Planning Area 36--LOS E acceptable b Orange County Congestion Management Program (CMP) locations Iteris, Inc. | 62
City Council
21 –
17 4/16/2024
IBC VISION PLAN 2018 TRAFFIC STUDY UPDATE –
ALTERNATIVES ANALYSIS
Final
Figure 3.1 – Alternative 2 Daily Arterial ADT
Iteris, Inc. | 63
City Council
21 –
18 4/16/2024
IBC VISION PLAN 2018 TRAFFIC STUDY UPDATE –
ALTERNATIVES ANALYSIS
Final
Figure 3.2 – Alternative 2 Daily Arterial Deficiencies
Iteris, Inc. | 64
City Council
21 –
19 4/16/2024
IBC VISION PLAN 2018 TRAFFIC STUDY UPDATE –
ALTERNATIVES ANALYSIS
Final
3.3 Alternative 2 Peak Hour Link Analysis
Peak hour directional traffic volumes were directly obtained from peak hour forecast turning movement volumes for intersections upstream and downstream for each deficient arterial segment. Table 3.2 presents the results of peak hour link analysis, indicating all arterial segments within the City of Irvine that are deficient under daily conditions operate at an acceptable LOS in both peak hours, and hence no mitigation measures are recommended at this time for these facilities.
Table 3.2 – Alternative 2 Peak Hour Link Analysis
ALTERNATIVE 2 FORECAST VOLUME AM PMFACILITY
TYPE
WITH UPDATEID ARTERIAL SEGMENT LIMITS AM PM
SB/WB NB/EB SB/WB NB/EB SB/WBNB/EB
645
1,648
SB/WB NB/EB
879 Campus Drive Carlson Avenue to University 4D
7D
1,369
3,406
1,155
3,330
868
2,038
Acceptable Acceptable Acceptable Acceptable
Acceptable Acceptable Acceptable Acceptable726 Culver Drive 213 Culver Drive
I-5 NB Ramps to I-5 SB Ramps
I-5 SB Off-Ramp to Scottsdale
Drive
Scottsdale Drive to Walnut
Avenue
Walnut Avenue to Deerfield
Avenue
Irvine Center Drive to Warner
Avenue
6D
6D
6D
6D
6D
1,615
1,580
1,361
1,356
1,462
3,102
2,689
2,786
2,797
2,699
3,020
2,839
1,957
2,650
2,726
2,556
2,162
2,786
1,937
1,830
Acceptable Acceptable Acceptable Acceptable
Acceptable Acceptable Acceptable Acceptable
Acceptable Acceptable Acceptable Acceptable
Acceptable Acceptable Acceptable Acceptable
Acceptable Acceptable Acceptable Acceptable
214 Culver Drive
215 Culver Drive
217 Culver Drive
219 Culver Drive Barranca Parkway to Alton
Parkway
220 Culver Drive
221 Culver Drive
Alton Parkway to Main Street
Main Street to San Leandro
San Leandro to I-405 NB On-
Ramp
I-405 SB On-Ramp to
Michelson Drive
Michelson Drive to University
Drive
Michelle Drive to Walnut
Avenue
6D
6D
1,620
1,515
2,669
2,747
2,960
2,860
1,839
1,848
Acceptable Acceptable Acceptable Acceptable
Acceptable Acceptable Acceptable Acceptable
222 Culver Drive 6D
6D
2U
5D
8D
1,626
2,133
535
3,025
2,838
1,163
2,608
3,399
5,101
2,514
2,576
2,017
1,852
1,881
3,102
2,779
1,221
1,801
3,854
4,521
2,669
2,780
2,160
1,918
1,920
1,925
2,266
940
Acceptable Acceptable Acceptable Acceptable
Acceptable Acceptable Acceptable Acceptable
Acceptable Acceptable Acceptable Acceptable
Acceptable Acceptable Acceptable Acceptable
Acceptable Acceptable Acceptable Acceptable
Acceptable Acceptable Acceptable Acceptable
Acceptable Acceptable Acceptable Acceptable
Acceptable Acceptable Acceptable Acceptable
Acceptable Acceptable Acceptable Acceptable
Acceptable Acceptable Acceptable Acceptable
Acceptable Acceptable Acceptable Acceptable
224 Culver Drive
Harvard183
133
144
148
149
98 Avenue
Jamboree
Road
Jamboree
Road
Jamboree
Road
Jamboree
Road
Von Karman
Avenue
814 1,795
2,529
3,706
2,508
2,680
1,352
1,110
1,079
Kelvin Avenue to Main Street 1,812
2,736
1,854
2,140
957
I-405 On-Ramp to Michelson
Drive
Michelson Drive to Dupont
Drive
Barranca Parkway to Alton
Parkway
Alton Parkway to McGaw
Avenue
Maj8D+
2AUX
7D
4D
4D
4D
4D
Von Karman
Avenue
Von Karman
Avenue
Von Karman
Avenue
100
102
103
McGaw Avenue to Anchor
Anchor to Main Street
942
880
3.4 Alternative 2 Peak Hour Intersection Analysis
The intersection analysis includes both a reporting of intersection ICU and the corresponding LOS, as well as a comparison between Buildout Cumulative With Update and Alternative 2 scenarios. The results of this Iteris, Inc. | 65
City Council
21 –
20 4/16/2024
IBC VISION PLAN 2018 TRAFFIC STUDY UPDATE –
ALTERNATIVES ANALYSIS
Final
analysis are presented in Table 3.3. There are 24 intersection deficiencies so compared to the Buildout Cumulative With Update scenario, there is one more intersections that become deficient in the Alternative 2 scenario: #720: Flower at MacArthur Boulevard (Costa Mesa). Further discussion of specific impacts, mitigation, and fair-share cost analysis is addressed in Section 3.7. Based on the Alternative 2 intersection ICU analysis, the following intersections within the study area are forecast to operate at the deficient LOS:
#12: SR-55 Frontage Road SB at Baker Street (Costa Mesa) – AM Peak Hour LOS E with a 0.91 ICU #720: Flower at MacArthur Boulevard (Costa Mesa) – AM Peak Hour LOS E with a 0.91 ICU* #98: Von Karman Avenue at Alton Parkway (Irvine) – PM Peak Hour LOS F with a 1.02 ICU #144: Jamboree Road at I-405 SB Ramps (Irvine) – AM Peak Hour LOS F with a 1.06 ICU #145: Jamboree Road at Michelson Drive (Irvine) – PM Peak Hour LOS F with a 1.02 ICU #188: Harvard Avenue at Michelson Drive (Irvine) – PM Peak Hour LOS E with a 0.91 ICU #192: California Avenue at University Drive (Irvine) – AM Peak Hour LOS E with a 0.97 ICU #232: Culver Drive at I-405 NB Ramps (Irvine) – PM Peak Hour LOS E with a 0.92 ICU #84: MacArthur Boulevard at Campus Drive (Irvine/Newport Beach) – PM Peak Hour LOS E with a
0.94 ICU
#44: Red Hill Avenue at Alton Parkway (Irvine / Santa Ana) – PM Peak Hour LOS E with a 0.97 ICU #97: Von Karman Avenue/Tustin Ranch Road at Barranca Parkway (Irvine/Tustin) – PM Peak Hour LOS F with a 1.19 ICU
#136: Jamboree Road at Barranca Parkway (Irvine/Tustin) – AM Peak Hour LOS E with a 0.94 ICU and PM Peak Hour LOS E with a 1.11 ICU
#63: Campus Drive at Bristol Street SB (Newport Beach) – AM Peak Hour LOS E with a 0.93 ICU #543: Bristol at Segerstrom (Santa Ana) – AM Peak Hour LOS E with a 1.00 ICU and PM Peak Hour LOS E with a 0.93 ICU
#544: Bristol Street at MacArthur Boulevard (Santa Ana) – PM Peak Hour LOS E with a 0.92 ICU #719: Flower at Segerstrom (Santa Ana) – PM Peak Hour LOS E with a 1.02 ICU* #723: Main Street at Segerstrom (Santa Ana) – AM Peak Hour LOS E with a 1.00 ICU and PM Peak Hour LOS F with a 1.19 ICU
#727: Halladay at Dyer (Santa Ana) – PM Peak Hour LOS E with a 1.00 ICU #728: Halladay E at Alton Parkway (Santa Ana) – AM Peak Hour LOS F with a 1.12 ICU #3: Newport Avenue at Edinger Avenue (Tustin) – AM Peak Hour LOS F with a 1.15 ICU #38: Red Hill Avenue at Walnut Avenue (Tustin) – PM Peak Hour LOS E with a 0.94 ICU #40: Red Hill Avenue at Edinger Avenue (Tustin) – PM Peak Hour LOS E with a 0.91 ICU #453: Red Hill Avenue at Valencia Avenue (Tustin) – AM Peak Hour LOS E with a 1.00 ICU #749: Park Avenue at A Street (Tustin) – PM Peak Hour LOS E with a 0.97 ICU *Denotes impact in Alternative 2 Scenario
Figure 3.3 and Figure 3.4 graphically present the AM and PM peak hour intersection ICU for deficient intersections for the Alternative 2 scenario. Appendix A presents detailed ICU worksheets. For shared jurisdictions, the more conservative methodology was utilized.
Iteris, Inc. | 66
City Council
21 –
21 4/16/2024
IBC VISION PLAN 2018 TRAFFIC STUDY UPDATE –
ALTERNATIVES ANALYSIS
Final
Table 3.3 – Alternative 2 Peak Hour Intersection LOS
BUILDOUT CUMULATIVE WITH ALTERNATIVE 2
AM PM
UPDATE
AM PMID INTERSECTION
ICU LOS ICU LOS ICU LOS ICU LOS
10 SR-55 Frontage Rd SB at Paularino Ave
11 SR-55 Frontage Rd NB at Paularino Ave
12 SR-55 Frontage Rd SB at Baker St
13 SR-55 Frontage Rd NB at Baker St
50 Red Hill Ave at Paularino Ave
51 Red Hill Ave at Baker St
52 Red Hill Ave at Bristol St
541 Bear at Baker St
542 Bear at Paularino Ave
545 Bristol at Sunflower
CM
CM
CM
CM
CM
CM
CM
CM
CM
CM
CM
CM
CM
CM
CM
CM
CM
CM
CM
CM
CM
CM
CM
CM
CM
CM
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
0.85 0.73
0.92 0.84
0.75 0.60
0.74 0.75
0.49 0.67
0.46 0.50
0.58 0.31
0.43 0.49
0.48 0.44
0.90 0.54
0.43 0.68
0.77 0.53
0.42 0.24
0.26 0.56
0.80 0.35
0.83 0.68
0.46 0.44
0.35 0.37
0.42 0.81
0.76 0.68
0.94 0.55
0.48 0.92
0.77 0.73
0.62 0.87
D
C
E
0.77 0.61
0.80 0.71
0.69 0.69
0.65 0.74
0.73 0.73
0.66 0.81
0.66 0.57
0.53 0.73
0.60 0.54
0.87 0.57
0.41 0.74
0.55 0.59
0.36 0.70
0.25 0.81
0.89 0.47
0.94 0.72
0.66 0.63
0.40 0.49
0.53 0.91
0.72 0.82
0.96 0.70
0.50 1.02
0.88 0.84
0.71 0.95
C
B
C
C
B
B
B
C
C
C
B
D
B
A
A
C
A
A
D
A
A
C
A
A
A
B
A
D
D
A
E
C
B
B
A
A
A
E
C
D
E
B
A
F
D
D
C
E
0.86 0.73
0.91 0.82
0.74 0.60
0.75 0.75
0.49 0.68
0.46 0.51
0.58 0.31
0.43 0.49
0.49 0.44
0.91 0.53
0.42 0.69
0.77 0.52
0.43 0.25
0.26 0.55
0.79 0.33
0.83 0.68
0.46 0.44
0.36 0.37
0.41 0.82
0.77 0.68
0.93 0.55
0.48 0.93
0.77 0.73
0.62 0.87
D
C
E
0.78 0.61
0.81 0.70
0.69 0.68
0.64 0.76
0.71 0.74
0.66 0.79
0.67 0.58
0.53 0.74
0.60 0.54
0.88 0.58
0.40 0.73
0.54 0.59
0.36 0.70
0.25 0.80
0.86 0.43
0.91 0.71
0.65 0.62
0.40 0.48
0.53 0.92
0.72 0.82
0.96 0.70
0.50 1.02
0.87 0.84
0.71 0.96
C
B
D
B
B
B
B
C
C
C
B
C
B
A
A
C
A
A
D
A
A
C
A
A
A
B
A
C
D
A
E
C
B
B
A
A
A
E
C
D
E
B
A
F
D
D
C
E
*
D
C
A
C
C
A
B
A
A
A
A
A
A
A
A
D
A
A
B
C
A
A
A
A
A
C
A
D
B
A
A
A
A
A
D
C
B
E
D
C
A
C
C
A
B
A
A
A
A
A
A
A
A
E
A
A
B
C
A
A
A
A
A
C
A
D
B
A
A
A
A
A
D
C
B
E
546 Bristol at Anton
547 Bristol at Paularino Ave
548 Bristol at Baker St
549 Newport Blvd SB at Bristol
550 Newport Blvd NB at Bristol
715 Bristol at I-405 NB Off Ramp
716 Bristol at I-405 SB Ramps
717 Bear at SR-73 SB Ramps
720 Flower at MacArthur Blvd
721 Flower at Sunflower
722 Anton at Sunflower
726 Main St at Sunflower
735 Newport Blvd NB at Del mar
736 Newport Blvd SB at Fair/Del Mar
737 Newport Blvd NB at Mesa Rd
738 Newport Blvd SB at Mesa Rd
32 Daimler St at McGaw Ave
45 Red Hill Ave at McGaw Ave
47 Red Hill Ave at MacArthur Blvd
48 Red Hill Ave at Sky Park N
49 Red Hill Ave at Main St
66 Gillette Avenue at Alton Parkway
67 Gillette Ave at McGaw Ave
70 Gillette Ave at Main Street
73 Armstrong Avenue and Alton Parkway West
74 Armstrong Avenue and Alton Parkway East
77 MacArthur Blvd at Sky Park East
78 MacArthur Blvd at Main St
79 MacArthur Blvd at I-405 NB Ramps
80 MacArthur Blvd at I-405 SB Ramps
82 MacArthur Blvd at Michelson Dr
83 MacArthur Blvd at Douglas Ave
87 Dupont Dr at Michelson Dr
98 Von Karman Ave at Alton Pkwy
99 Von Karman Ave at McGaw Ave
100 Von Karman Ave at Main St
101 Von Karman Ave at Morse Ave
102 Von Karman Ave at Michelson Dr
a
a
a
a
a
a
a
a
a
a
a
a
a
a
a
a
a
a
a
a
a
A
A
E
C
C
B
D
A
A
E
C
C
B
D
Irv
Irv
Irv
Irv
Irv
Iteris, Inc. | 67
City Council
21 –
22 4/16/2024
IBC VISION PLAN 2018 TRAFFIC STUDY UPDATE –
ALTERNATIVES ANALYSIS
Final
BUILDOUT CUMULATIVE WITH ALTERNATIVE 2
AM PM
UPDATE
AM PMID INTERSECTION
ICU LOS ICU LOS ICU LOS ICU LOS
103 Von Karman Ave at Dupont Dr
104 Von Karman Ave at Martin
115 Millikan Ave at Alton Pkwy
116 Cartwright Rd at Main St
119 Teller Ave at Michelson Dr
128 Jamboree Rd at I-5 NB Ramps
129 Jamboree Rd at I-5 SB Ramps
130 Jamboree Rd at Michelle Dr
131 Jamboree Rd SB at Walnut Ave
132 Jamboree Rd NB at Walnut Ave
135 Jamboree Rd NB Ramps at Warner Ave
137 Jamboree Rd at Beckman Ave
138 Jamboree Rd at Alton Pkwy
139 Jamboree Rd at McGaw Ave
140 Jamboree Rd at Kelvin Ave
141 Jamboree Rd at Main St
143 Jamboree Rd at I-405 NB Ramps
144 Jamboree Rd at I-405 SB Ramps
145 Jamboree Rd at Michelson Dr
146 Jamboree Rd at Dupont Rd
164 Construction S at Barranca Pkwy
168 Murphy Ave at Alton Pkwy
170 Union at Main St
a
a
a
a
a
b
b
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
0.66 0.48
0.45 0.51
0.67 0.86
0.75 0.71
0.64 0.48
0.45 0.64
0.76 0.70
0.70 0.80
0.82 1.06
0.91 0.64
0.39 0.41
0.38 0.38
0.67 0.71
0.44 0.51
0.57 0.69
0.64 0.65
0.75 0.83
0.69 0.49
0.97 0.74
0.45 0.47
0.50 0.57
0.78 0.84
0.70 0.76
0.82 0.78
0.80 B
A
A
A
B
D
C
C
B
A
A
B
C
B
B
C
D
F
0.71 0.64
0.65 0.66
0.64 0.73
0.59 0.79
0.68 0.63
0.90 0.76
0.90 0.77
0.72 0.93
0.95 0.93
1.02 0.73
0.68 0.74
0.65 0.60
0.84 0.81
0.56 0.73
0.75 0.69
0.80 0.64
0.91 0.86
0.77 0.60
0.81 0.65
0.44 0.61
0.68 0.59
0.71 0.78
0.64 0.87
0.84 0.78
0.74 C
B
B
B
B
C
A
C
B
B
D
C
D
C
C
E
0.66 0.47
0.44 0.51
0.67 0.86
0.76 0.71
0.63 0.47
0.45 0.62
0.77 0.71
0.70 0.80
0.83 1.06
0.91 0.64
0.39 0.41
0.38 0.38
0.67 0.71
0.44 0.51
0.57 0.69
0.64 0.65
0.75 0.84
0.69 0.50
0.97 0.74
0.45 0.47
0.50 0.57
0.79 0.84
0.70 0.76
0.81 0.78
0.80 B
A
A
A
B
D
C
C
B
A
A
B
C
C
B
C
D
F
0.71 0.64
0.65 0.66
0.64 0.73
0.59 0.80
0.67 0.63
0.90 0.76
0.90 0.77
0.72 0.94
0.96 0.94
1.02 0.74
0.68 0.74
0.66 0.60
0.84 0.81
0.56 0.73
0.74 0.69
0.80 0.64
0.91 0.86
0.77 0.59
0.81 0.65
0.44 0.61
0.68 0.59
0.71 0.78
0.64 0.87
0.84 0.78
0.74 C
B
B
B
B
C
A
C
B
B
D
C
D
C
C
E
a
a
a
a
a
a,b
a,b
a
a
a
E
E
F
E
E
FE E
B
A
A
A
A
B
C
A
A
A
B
B
B
C
D
B
A
E
C
A
A
A
A
C
D
B
C
D
C
C
C
B
C
B
A
D
D
A
C
C
B
C
B
E
D
C
A
D
B
A
B
B
A
C
C
B
D
D
C
C
B
A
A
A
A
B
C
A
A
A
B
B
B
C
D
B
A
E
C
A
A
A
A
C
D
B
C
D
C
C
C
B
C
B
A
D
D
A
C
C
B
C
B
E
D
C
A
D
B
A
B
B
A
C
C
B
D
D
C
C
a
a
171 Veneto at Main St
174 Carlson Ave at Michelson Dr
175 Carlson Ave at Campus Dr
180 Harvard Ave at Walnut Ave
183 Harvard Ave at Warner Ave
184 Harvard Ave at Barranca Pkwy
185 Harvard Ave at Alton Pkwy
186 Harvard Ave at Main St
187 Harvard Ave at Coronado
188 Harvard Ave Michelson Dr
189 Harvard Ave University Dr
190 University Dr at Campus Dr
191 Mesa Rd at University Dr
192 California Ave at University Dr
196 Hearthstone Blvd at Irvine Center Dr
198 Paseo Westpark at Warner Ave
199 Paseo Westpark at Barranca Pkwy
200 Paseo Westpark at Alton Pkwy
201 Paseo Westpark at Main St
221 Culver Dr at Bryan Ave
√
222 Culver Dr at Trabuco Rd
223 Culver Dr at I-5 SB Ramps
224 Culver Dr at Walnut Ave
225 Culver Dr at Deerfield Dr
226 Culver Dr at Irvine Center Dr
227 Culver Dr at Warner Ave
√
√
Iteris, Inc. | 68
City Council
21 –
23 4/16/2024
IBC VISION PLAN 2018 TRAFFIC STUDY UPDATE –
ALTERNATIVES ANALYSIS
Final
BUILDOUT CUMULATIVE WITH ALTERNATIVE 2
AM PM
UPDATE
AM PMID INTERSECTION
ICU LOS ICU LOS ICU LOS ICU LOS
228 Culver Dr at Barranca Pkwy
229 Culver Dr at Alton Pkwy
230 Culver Dr at Main St
231 Culver Dr at San Leandro
232 Culver Dr at I-405 NB Ramps
233 Culver Dr at I-405 SB Ramps
234 Culver Dr at Michelson Dr
235 Culver Dr at University Dr
337 Von Karman Ave at Quartz
439 Bixby at Michelson Dr
√
√
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
Irv
0.79 0.75
0.67 0.78
0.71 0.73
0.64 0.82
0.78 0.48
0.40 0.58
0.74 0.75
0.45 0.83
0.74 0.88
0.83 0.70
0.76 0.82
0.75 0.67
0.52 1.02
0.77 0.53
C
C
B
C
C
C
B
D
C
A
A
A
C
C
A
D
C
D
D
B
C
D
C
B
A
F
0.80 0.87
0.79 0.62
0.92 0.72
0.86 0.79
0.86 0.56
0.56 0.68
0.93 0.85
0.58 0.82
0.76 0.87
0.90 0.78
0.68 0.57
0.64 0.69
0.88 1.32
0.90 0.74
C
D
C
B
E
C
D
C
D
A
A
B
E
D
A
D
C
D
D
C
B
A
B
B
D
F
0.79 0.77
0.68 0.78
0.71 0.73
0.64 0.82
0.78 0.48
0.40 0.57
0.74 0.75
0.45 0.83
0.74 0.88
0.84 0.70
0.76 0.83
0.75 0.68
0.51 0.83
0.77 0.52
C
C
B
C
C
C
B
D
C
A
A
A
C
C
A
D
C
D
D
B
C
D
C
B
A
D
C
A
0.80 0.88
0.78 0.62
0.92 0.72
0.87 0.80
0.85 0.56
0.56 0.68
0.94 0.85
0.58 0.82
0.76 0.88
0.89 0.78
0.68 0.57
0.64 0.71
0.87 0.97
0.89 0.74
C
D
C
B
E
C
D
C
D
A
A
B
E
D
A
D
C
D
D
C
B
A
B
C
D
E
√
a
a
Irv
Irv
Irv
440 Siglo at Main St
472 Obsidian at Michelson Dr
84 MacArthur Blvd at Campus Dr
105 Von Karman Ave at Campus Dr
121 Teller Ave at Campus Dr
147 Jamboree Rd at Campus Dr
149 Jamboree Rd at Fairchild Rd
150 Jamboree Rd at MacArthur Blvd
176 Fairchild Ave at MacArthur Blvd
193 MacArthur Blvd NB at University Dr
194 MacArthur Blvd SB at University Dr
195 SR-73 SB Ramps at University Dr
Irv/NB
Irv/NB
Irv/NB
Irv/NB
Irv/NB
Irv/NB
Irv/NB
Irv/NB
Irv/NB
Irv/NB
Irv/SA
Irv/SA
Irv/SA
Irv/SA
Irv/SA/Tus
Irv/Tus
b
9 SR-55 NB Ramps at MacArthur Blvd
31 Daimler St at Alton Pkwy
43 Red Hill Ave at Deere Ave
44 Red Hill Ave at Alton Pkwy
42 Red Hill Ave at Barranca Pkwy/Dyer Rd
71 Armstrong Ave at Barranca Pkwy
Von Karman Ave/Tustin Ranch Rd at
C
A
D
C
D
C
97 Irv/Tus 0.89 D 1.19 F 0.90 D 1.19 FBarranca Pkwy
112 Myford Rd at Michelle Dr
113 Myford Rd at Walnut Ave
114 Millikan Ave/District Way at Barranca Pkwy
126 Jamboree Rd at Bryan Ave
127 Jamboree Rd at El Camino Real
134 Loop Rd/Park Ave at Warner Ave
136 Jamboree Rd at Barranca Pkwy
181 Harvard Ave at Edinger Ave/Irvine Center Dr
182 Harvard Ave at Paseo Westpark/Moffett Dr.
441 Loop Rd at Jamboree Rd SB Ramps
61 Campus Dr at Airport Way
Irv/Tus
Irv/Tus
Irv/Tus
Irv/Tus
Irv/Tus
Irv/Tus
Irv/Tus
Irv/Tus
Irv/Tus
Irv/Tus
NB
NB
NB
NB
NB
NB
NB
NB
NB
0.36 0.36
0.53 0.72
0.74 0.50
0.94 0.54
0.42 0.39
0.55 0.79
0.93 0.75
0.61 0.65
0.50 0.48
0.68 0.37
A
A
A
C
C
A
E
A
A
A
A
C
E
C
B
B
A
A
B
A
0.28 0.49
0.72 0.80
0.80 0.78
1.11 0.72
0.52 0.80
0.86 0.81
0.74 0.73
0.65 0.78
0.56 0.67
0.58 0.58
A
A
C
C
C
C
F
C
A
C
D
D
C
C
B
C
A
B
A
A
0.37 0.36
0.53 0.72
0.74 0.50
0.94 0.54
0.42 0.39
0.55 0.79
0.93 0.75
0.61 0.65
0.50 0.47
0.67 0.37
A
A
A
C
C
A
E
A
A
A
A
C
E
C
B
B
A
A
B
A
0.28 0.48
0.72 0.80
0.80 0.78
1.11 0.73
0.51 0.80
0.86 0.80
0.74 0.73
0.65 0.78
0.56 0.67
0.58 0.59
A
A
C
C
C
C
F
C
A
C
D
C
C
C
B
C
A
B
A
A
62 Campus Dr at Bristol St NB
63 Campus Dr at Bristol St SB
64 Birch St at Bristol St NB
65 Birch St at Bristol St SB
85 MacArthur Blvd at Birch St
106 Von Karman Ave at Birch St
107 Von Karman Ave at MacArthur Blvd
148 Jamboree Rd at Birch St
151 Jamboree Rd at Bristol St NB NB
Iteris, Inc. | 69
City Council
21 –
24 4/16/2024
IBC VISION PLAN 2018 TRAFFIC STUDY UPDATE –
ALTERNATIVES ANALYSIS
Final
BUILDOUT CUMULATIVE WITH ALTERNATIVE 2
AM PM
UPDATE
AM PMID INTERSECTION
ICU LOS ICU LOS ICU LOS ICU LOS
153 Jamboree Rd at Bristol St SB
154 Jamboree Rd at Eastbluff Dr
155 Jamboree Rd at Bison Ave
156 Jamboree Rd at Ford Rd
178 MacArthur Blvd at Bison Ave
179 MacArthur Blvd at Ford Rd
741 Jamboree at San Joaquin
742 MacArthur at San Joaquin
733 Irvine at Mesa Rd
NB
NB
NB
NB
NB
NB
NB
NB
NB/OC
NB/OC
SA
SA
SA
SA
SA
SA
SA
SA
SA
SA
SA
SA
SA
SA
SA
0.69 0.69
0.47 0.90
0.67 0.66
0.62 0.51
0.73 0.68
0.81 0.61
0.81 0.85
0.70 0.60
1.00 0.80
0.37 0.84
1.00 0.62
0.67 0.88
1.12 0.82
0.65 0.63
1.15 0.51
0.54 0.84
0.85 0.81
0.63 0.68
0.82 0.68
0.50 0.62
0.54 0.67
0.78 0.71
0.76 0.43
0.51 0.47
0.73 B
B
A
D
B
B
B
A
C
B
D
B
D
D
B
A
E
C
A
D
E
B
B
D
F
0.60 0.62
0.55 0.77
0.66 0.68
0.56 0.73
0.74 0.75
0.69 0.77
0.68 0.59
0.62 0.81
0.93 0.92
0.64 1.00
1.19 0.81
0.83 1.00
0.84 0.77
0.72 0.53
0.67 0.52
0.67 0.79
0.85 0.62
0.73 0.57
0.84 0.66
0.48 0.80
0.54 0.78
0.94 0.67
0.91 0.59
0.49 0.66
0.82 A
B
A
C
B
B
A
C
C
C
B
C
B
A
B
D
E
0.70 0.69
0.47 0.90
0.68 0.66
0.62 0.51
0.73 0.68
0.81 0.61
0.81 0.85
0.70 0.60
1.00 0.80
0.37 0.84
1.00 0.63
0.68 0.88
1.12 0.82
0.64 0.66
1.15 0.49
0.54 0.84
0.85 0.80
0.62 0.67
0.83 0.70
0.49 0.62
0.54 0.68
0.79 0.71
0.76 0.42
0.50 0.48
0.73 B
B
A
D
B
B
B
A
C
B
D
B
D
D
B
A
E
C
A
D
E
B
B
D
F
0.60 0.62
0.55 0.77
0.67 0.68
0.56 0.72
0.74 0.75
0.69 0.77
0.69 0.59
0.63 0.81
0.93 0.92
0.64 1.02
1.19 0.82
0.83 1.00
0.85 0.77
0.72 0.53
0.67 0.53
0.67 0.78
0.85 0.62
0.73 0.56
0.84 0.66
0.48 0.80
0.54 0.78
0.94 0.67
0.91 0.60
0.50 0.67
0.82 A
B
A
C
B
B
A
C
C
C
B
C
B
A
B
D
E
734 Irvine at University/Del Mar
4 5
6 7
8 SR-55 SB Ramps at Edinger Ave
Hotel Terrace Dr at Dyer Rd
Grand Ave at Dyer Rd
SR-55 NB Ramps at Dyer Rd
SR-55 SB Ramps at MacArthur Blvd
b
c
29 Pullman St at Barranca Pkwy
543 Bristol at Segerstrom
544 Bristol St at MacArthur Blvd
718 Bear at SR-73 NB Ramps
719 Flower at Segerstrom
723 Main St at Segerstrom
724 Main St at Alton Ave
725 Main and MacArthur (w/o SR-55)
727 Halladay at Dyer Rd
E
B
E
E
B
F*
c
F F
D
D
E
D
D
E
728 Halladay E at Alton Pkwy
729 Halladay W at Alton Pkwy
730 Grand Ave at Warner
D
C
C
A
B
A
B
C
D
B
C
A
D
B
A
C
A
C
E
D
C
C
A
B
A
B
C
D
B
C
A
D
B
A
C
A
C
E
SA
SA
SA
D
B
B
F
D
B
B
F
731 SR-55 SB Ramps at Grand Ave
3 Newport Ave at Edinger Ave Tus
Tus
Tus
Tus
Tus
Tus
Tus
Tus
Tus
Tus
Tus
Tus
Tus
Tus
Tus
Tus
Tus
Tus
Tus
Tus
Tus
14 Walnut Ave at McFadden Ave
18 Newport Ave at Bryan Ave
19 Newport Ave at Main St
A
A
D
D
D
B
B
D
B
A
B
A
B
C
C
C
A
A
A
C
A
A
D
D
C
B
B
D
B
A
B
A
B
C
C
C
A
A
A
C
20 Newport Ave at El Camino Real
21 Newport Ave at I-5 NB Ramps
22 Newport Ave at I-5 SB Ramp/Nisson Rd
23 Newport Ave at McFadden St
24 Newport Ave at Walnut Ave
25 Newport Ave at Sycamore Ave
27 Del Amo Ave at Edinger Ave
35 Red Hill Ave at Bryan Ave
36 Red Hill Ave at El Camino Real
37 Red Hill Ave at Nisson Rd
38 Red Hill Ave at Walnut Ave
39 Red Hill Ave at Sycamore Ave
40 Red Hill Ave at Edinger Ave
55 Browning Ave at Bryan Ave
56 Browning Ave at El Camino Real
58 Browning Ave at Walnut Ave
92 Tustin Ranch Rd at Bryan Ave
B
E
A
A
B
D
B
E
A
A
B
D
Iteris, Inc. | 70
City Council
21 –
25 4/16/2024
IBC VISION PLAN 2018 TRAFFIC STUDY UPDATE –
ALTERNATIVES ANALYSIS
Final
BUILDOUT CUMULATIVE WITH ALTERNATIVE 2
AM PM
UPDATE
AM PMID INTERSECTION
ICU LOS ICU LOS ICU LOS ICU LOS
93 Tustin Ranch Rd at El Camino Real
94 Tustin Ranch Rd at I-5 NB Ramps
95 Tustin Ranch Rd at I-5 SB Ramps
96 Tustin Ranch Rd at Walnut Ave
109 Myford Rd at Bryan Ave
110 Myford Rd at El Camino Real
111 Franklin Ave at Walnut Ave
133 Jamboree Rd at Edinger Ave
445 Tustin Ranch Rd at Warner Ave N
446 Tustin Ranch Rd at Warner Ave S
447 Armstrong Ave/Severyns Rd Valencia Ave
448 Armstrong Ave at Warner Ave
453 Red Hill Ave at Valencia Ave
454 Tustin Ranch Rd at Valencia Ave
455 E Connector/Jamboree Plaza at Edinger Ave
456 N Loop Rd at Valencia Ave
Tus
Tus
Tus
Tus
Tus
Tus
Tus
Tus
Tus
Tus
Tus
Tus
Tus
Tus
Tus
Tus
Tus
Tus
Tus
Tus
Tus
Tus
Tus
Tus
Tus
Tus
Tus
Tus
Tus
Tus
Tus
Tus
Tus
Tus/SA
Tus/SA
Tus/SA
0.86 0.65
0.70 0.68
0.52 0.44
0.53 0.47
0.54 0.64
0.37 0.38
1.00 0.60
0.58 0.17
0.47 0.67
0.68 0.21
0.64 0.75
0.58 0.60
0.50 0.45
0.36 0.36
0.75 0.45
0.65 0.17
0.47 0.62
0.56 0.54
D
B
B
B
A
A
A
A
A
B
A
A
E
A
A
A
A
B
B
A
B
C
A
A
A
A
A
A
C
A
B
A
A
B
A
A
0.76 0.57
0.66 0.87
0.66 0.66
0.84 0.74
0.73 0.81
0.41 0.43
0.79 0.68
0.66 0.15
0.37 0.65
0.80 0.19
0.65 0.71
0.68 0.89
0.65 0.60
0.37 0.48
0.97 0.67
0.73 0.16
0.40 0.67
0.77 0.67
C
A
B
D
B
B
D
C
C
D
A
A
C
B
B
A
A
B
C
A
B
C
B
D
B
A
A
A
E
0.86 0.65
0.70 0.69
0.52 0.44
0.53 0.47
0.54 0.65
0.37 0.38
1.00 0.59
0.58 0.17
0.47 0.67
0.68 0.21
0.64 0.75
0.58 0.60
0.50 0.45
0.36 0.36
0.75 0.45
0.65 0.17
0.47 0.63
0.56 0.54
D
B
B
B
A
A
A
A
A
B
A
A
E
A
A
A
A
B
B
A
B
C
A
A
A
A
A
A
C
A
B
A
A
B
A
A
0.77 0.57
0.66 0.87
0.66 0.66
0.84 0.74
0.73 0.80
0.41 0.43
0.81 0.68
0.66 0.15
0.37 0.65
0.79 0.19
0.65 0.71
0.68 0.90
0.65 0.60
0.37 0.48
0.97 0.67
0.73 0.16
0.40 0.67
0.77 0.67
C
A
B
D
B
B
D
C
C
C
A
A
D
B
B
A
A
B
C
A
B
C
B
D
B
A
A
A
E
b
457 N Loop Rd at Moffett Dr
478 Red Hill Ave at I-5 NB Ramps
479 Red Hill Ave at I-5 SB Ramps
480 Tustin Ranch Rd/Connector at Edinger Ave
732 SR-55 NB Ramp at Newport Ave
739 Newport Ave at Mitchell Ave
740 Red Hill Ave at Mitchell Ave
743 Newport Ave at Valencia
745 Tustin Ranch Rd at Park Ave
746 Kensington Park Dr at Edinger Ave
747 Kensington Park Dr at Valencia Ave
748 Armstrong Ave at A St
749 Park Ave at A St
750 Legacy Rd at Warner Ave
751 Tustin Ranch Rd at Legacy Rd
752 Legacy Rd at N Loop Rd
753 Tustin Ranch Rd at Edinger Ave Connector
28 Pullman St at Warner Ave
B
C
A
A
B
C
B
B
C
A
A
B
C
B
41 Red Hill Ave at Warner Ave
754 Red Hill Ave at Carnegie Ave
F
a
b
c
√
*
Denotes intersection operating at a deficient LOS
Intersection within Irvine Planning Area 36--LOS E acceptable Orange County Congestion Management Program (CMP) locations Intersections within City of Santa Ana--LOS E acceptable ATMS credit-Reduction of 0.05 applied to ICU
Impact
Iteris, Inc. | 71
City Council
21 –
26 4/16/2024
IBC VISION PLAN 2018 TRAFFIC STUDY UPDATE –
ALTERNATIVES ANALYSIS
Final
Figure 3.3 – Alternative 2 AM Peak Hour Intersection Deficiencies Iteris, Inc. | 72
City Council
21 –
27 4/16/2024
IBC VISION PLAN 2018 TRAFFIC STUDY UPDATE –
ALTERNATIVES ANALYSIS
Final
Figure 3.4 – Alternative 2 PM Peak Hour Intersection Deficiencies Iteris, Inc. | 73
City Council
21 –
28 4/16/2024
IBC VISION PLAN 2018 TRAFFIC STUDY UPDATE –
ALTERNATIVES ANALYSIS
Final
3.5 Alternative 2 Peak Hour Freeway Mainline Analysis
Future freeway mainline volumes are based on forecast traffic using the ITAM model. Table 3.4 presents the freeway mainline segment analysis for Alternative 2 conditions and compares mainline segment performance to Buildout Cumulative With Update conditions. The Alternative 2 scenario does not include any freeway mainline capacity improvements, consequently, the capacities are consistent with the Buildout Cumulative With Update scenario. Appendix B presents detailed HCS worksheets for mainline analysis.
The same segments that are forecast to be deficient in the Buildout With Update scenario are also deficient in Alternative 2. In the AM peak, 34 out of 60 freeway segments operate at a deficient LOS and in the PM peak 27 out of 60 operate at a deficient LOS. In total 40 segments are deficient in one or both peaks. The deficient segments are:
AM Peak Hour:
I-5 Northbound Between Culver Drive and Jamboree Road Between Jamboree Road and Tustin Ranch Road
Between Tustin Ranch Road and Red Hill Avenue
Between Red Hill Avenue and Newport Avenue
Between Newport Avenue and SR-55
North of SR-55
Southbound Between Jamboree Road and Culver Drive
Between Tustin Ranch Road and Jamboree Road
Between Red Hill Avenue and Tustin Ranch Road
Between Newport Avenue and Red Hill Avenue
North of SR-55
I-405 Northbound
Southbound
Between Culver Drive and Jamboree Road
Between Jamboree Road and MacArthur Boulevard
Between MacArthur Boulevard and SR-55
Between Jamboree Road and Culver Drive
Between SR-55 and MacArthur Boulevard
Between Bristol Street and SR-55
Between SR-73 and Bristol Street
SR-55
SR-73
Northbound
Southbound
Fair Drive to SR-73
McFadden Street/Sycamore Avenue to I-5
Between Dyer Road and MacArthur Boulevard
Between Edinger Avenue and Dyer Road
Between McFadden Street/Sycamore Avenue and Edinger Avenue Between I-5 and McFadden Street/Sycamore Avenue
Between MacArthur Boulevard and University Drive
Between University Drive and Jamboree Road
Between Jamboree Road and Birch Street
Between Birch Street and Campus Drive
Between Campus Drive and SR-55
Northbound
Southbound Between University Drive and MacArthur Boulevard Between Campus Drive and Birch Street
Between SR-55 and Campus Drive
Between SR-55 and Bear Street
SR-261 Southbound
Northbound
South of El Camino Real
PM Peak Hour:
I-5 Between Culver Drive to Jamboree Road
Between Jamboree Road to Tustin Rach Road
Between Tustin Ranch Road and Red Hill Avenue
Between Red Hill Avenue and Newport Avenue
Iteris, Inc. | 74
City Council
21 –
29 4/16/2024
IBC VISION PLAN 2018 TRAFFIC STUDY UPDATE –
ALTERNATIVES ANALYSIS
Final
Between Newport Avenue and SR-55
North of SR-55
Southbound Between Jamboree Road and Culver Drive
Between Tustin Ranch Road and Jamboree Road
Between Red Hill Avenue and Tustin Ranch Road
Between Newport Avenue and Red Hill Avenue
North of SR-55
I-405 Northbound
Southbound
Northbound
Between Jamboree Road and MacArthur Boulevard
Between SR-55 and MacArthur Boulevard
Between Jamboree Road and MacArthur Boulevard
Between SR-55 and MacArthur Boulevard
Between MacArthur Boulevard and Dyer Road
Between Dyer Road and Edinger Avenue
Between Edinger Avenue to McFadden Street/Sycamore Avenue Between McFadden Street/Sycamore Avenue and I-5
Between Edinger Avenue to Dyer Road
Between Jamboree Road and Birch Street
Between Birch Street and Campus Drive
Between Campus Drive and SR-55
SR-55
Southbound
NorthboundSR-73
Between SR-55 and Bear Street
Southbound Between MacArthur Boulevard and University Drive Between Birch Street and Campus Drive
Between SR-55 and Campus Drive
Table 3.4 – Alternative 2 Freeway Peak Hour Mainline LOS
BUILDOUT CUMULATIVE WITH UPDATE
AM PEAK HOUR PM PEAK HOUR
ALTERNATIVE 2
AM PEAK HOURFREEWAY LANES PM PEAK HOUR
LOCATION
Culver Dr to Jamboree
Rd
Jamboree Rd to Tustin
Ranch Rd
Tustin Ranch Rd to Red
Hill Ave
NB
SB
NB
SB
NB
SB
6 6
6 6
6 6
5 6
6 4
5 5
5 4
6 7
6 6
4 5
5 5
12,000 13,482 1.12
12,000 12,970 1.08
12,000 13,158 1.10
12,000 12,969 1.08
12,000 13,299 1.11
12,000 13,562 1.13
10,000 12,645 1.05
12,000 13,083 1.09
12,000 13,262 1.11
8,000 9,981 0.83
10,000 11,249 1.12
10,000 10,517 1.05
10,000 13,859 1.15
8,000 10,460 1.05
12,000 13,628 1.14
14,000 12,326 0.88
12,000 12,411 1.03
12,000 13,969 1.16
8,000 6,152 0.62
10,000 10,591 1.06
10,000 7,211 0.72
10,000 10,144 1.01
F
F
F
F
F
F
F
F
F
D
F
F
F
F
F
D
F
F
C
F
D
F
12,029 1.00
12,372 1.03
11,971 1.00
11,990 1.00
12,210 1.02
12,370 1.03
11,684 0.97
11,682 0.97
12,279 1.02
8,892 0.74
10,466 1.05
9,123 0.91
10,617 0.88
12,118 1.21
11,628 0.97
12,158 0.87
12,567 1.05
11,739 0.98
6,891 0.69
7,946 0.79
8,306 0.83
6,918 0.69
E
F
E
E
F
13,482 1.12 F
F
F
F
F
F
F
F
F
D
F
F
F
F
F
D
F
F
C
F
D
F
12,033 1.00 E
F
E
E
F
12,898 1.07
13,132 1.09
13,084 1.09
13,286 1.11
13,672 1.14
12,638 1.05
13,190 1.10
13,236 1.10
10,030 0.84
11,165 1.12
10,458 1.05
13,858 1.15
10,446 1.04
13,637 1.14
12,248 0.87
12,430 1.04
13,881 1.16
6,167 0.62
10,509 1.05
7,213 0.72
10,094 1.01
12,374 1.03
11,991 1.00
11,990 1.00
12,224 1.02
12,378 1.03
11,691 0.97
11,688 0.97
12,327 1.03
8,905 0.74
10,496 1.05
9,117 0.91
10,661 0.89
12,116 1.21
11,604 0.97
12,171 0.87
12,597 1.05
11,763 0.98
6,883 0.69
7,981 0.80
8,338 0.83
6,922 0.69
F F
Red Hill Ave to Newport NB E
E
F
D
F
E
D
F
E
D
F
E
C
D
D
C
E
E
F
D
F
E
D
F
E
D
F
E
C
D
D
C
Ave SB
NB
SB
NB
SB
NB
SB
NB
SB
NB
SB
NB
SB
NB
SB
Newport Ave to SR-55
North of SR-55
Culver Dr to Jamboree
Rd
Jamboree Rd to
MacArthur Blvd
MacArthur Blvd to SR-55
SR-55 to Bristol St
Bristol St to SR-73
Iteris, Inc. | 75
City Council
21 –
30 4/16/2024
IBC VISION PLAN 2018 TRAFFIC STUDY UPDATE –
ALTERNATIVES ANALYSIS
Final
BUILDOUT CUMULATIVE WITH UPDATE
AM PEAK HOUR PM PEAK HOUR
ALTERNATIVE 2
AM PEAK HOURFREEWAY LANES PM PEAK HOUR
LOCATION
NB
SB
NB
SB
NB
SB
NB
SB
NB
SB
NB
SB
4 3
4 3
4 4
4 4
4 4
4 4
4 4
4 4
5 8,000 3,984 0.66
6,000 3,187 0.53
8,000 6,396 0.80
6,000 5,006 0.63
8,000 7,911 0.99
8,000 5,887 0.74
8,000 7,009 0.88
8,000 6,818 0.85
8,000 7,009 0.88
8,000 6,818 0.85
8,000 9,035 0.75
8,000 10,674 0.89
8,000 8,094 0.81
8,000 10,668 1.07
8,000 8,198 0.82
8,000 10,999 1.37
10,000 8,431 0.84
C
C
D
C
E
D
D
D
D
D
D
D
D
F
3,424 0.57
3,276 0.55
4,867 0.61
5,556 0.69
6,210 0.78
6,500 0.81
6,143 0.77
6,675 0.83
6,143 0.77
6,675 0.83
9,220 0.77
8,947 0.75
9,387 0.94
8,070 0.81
10,330 1.03
7,674 0.96
10,377 1.04
C 4,044 0.67 C
C
D
C
E
D
D
D
D
D
D
D
D
F
3,424 0.57
3,278 0.55
C
C
C
C
D
D
D
D
D
D
D
D
E
South of Victoria St
Victoria St to Fair Dr
Fair Dr to SR-73
C
C
C
D
D
D
D
D
D
D
D
E
3,195 0.53
6,425 0.80
5,020 0.63
7,927 0.99
5,911 0.74
7,045 0.88
6,829 0.85
7,045 0.88
6,829 0.85
9,058 0.75
10,675 0.89
8,085 0.81
10,714 1.07
8,205 0.82
10,952 1.37
8,395 0.84
4,874 0.61
5,553 0.69
6,225 0.78
6,498 0.81
6,153 0.77
6,678 0.83
6,153 0.77
6,678 0.83
9,260 0.77
8,951 0.75
9,394 0.94
8,056 0.81
10,319 1.03
7,662 0.96
10,374 1.04
SR-73 to Baker St
Baker St to I-405
I-405 to MacArthur Blvd
MacArthur Blvd to Dyer NB
Rd SB
NB
SB
D
F
E
D
F
E
D
F
D
D
F
D
Dyer Rd to Edinger Ave
Edinger Ave to
McFadden St/ Sycamore
Ave
NB F F
SB 4 8,000 11,638 1.16 F 8,118 0.81 D 11,581 1.16 F 8,103 0.81 D McFadden St/Sycamore NB 5
5 3
3 3
4 3
3 4
3 4
4 4
4 3
3 3
3 10,000 9,110 0.91
10,000 10,964 1.10
6,000 6,114 0.61
6,000 8,447 0.84
6,000 8,333 1.04
8,000 7,461 0.93
6,000 7,563 0.95
6,000 5,583 0.70
8,000 9,667 1.21
6,000 6,891 0.86
8,000 7,835 0.98
8,000 8,291 1.04
8,000 8,834 1.10
8,000 10,630 1.33
6,000 6,459 0.81
6,000 7,194 0.90
6,000 5,505 0.69
6,000 6,577 0.82
E
F
C
D
F
E
E
C
F
D
E
F
F
F
D
E
C
D
10,957 1.10
7,971 0.80
7,829 0.78
5,777 0.58
6,857 0.86
7,575 0.95
5,730 0.72
6,072 0.76
8,562 1.07
7,095 0.89
7,412 0.93
7,711 0.96
9,839 1.23
8,854 1.11
7,218 0.90
5,884 0.74
6,174 0.77
5,126 0.64
F
D
D
C
D
E
D
D
F
D
E
E
F
F
9,092 0.91
10,950 1.09
6,164 0.62
8,426 0.84
8,362 1.05
7,461 0.93
7,588 0.95
5,582 0.70
9,666 1.21
6,895 0.86
7,840 0.98
8,298 1.04
8,839 1.10
10,640 1.33
6,462 0.81
7,195 0.90
5,510 0.69
6,620 0.83
E
F
C
D
F
E
E
C
F
D
E
F
F
F
D
E
C
D
10,962 1.10
7,943 0.79
7,852 0.79
5,796 0.58
6,835 0.85
7,572 0.95
5,707 0.71
6,068 0.76
8,541 1.07
7,092 0.89
7,388 0.92
7,696 0.96
9,802 1.23
8,852 1.11
7,195 0.90
5,885 0.74
6,144 0.77
5,128 0.64
F
D
D
C
D
E
C
D
F
D
E
E
F
F
Ave to I-5 SB
NB
SB
NB
SB
NB
SB
NB
SB
NB
SB
NB
SB
NB
SB
NB
SB
North of I-5
MacArthur Blvd to
University Dr
University Dr to
Jamboree Rd
Jamboree Rd to Birch St
Birch St to Campus Dr
Campus Dr to SR-55
SR-55 to Bear St E E
D
D
C
D
D
CBear St to I-405
NB 2 4,000 922 0.12 A 3,125 0.39
1,295 0.32
B
B
922 0.12 A 3,115 0.39
1,292 0.32
B
B
SR-261 South of El
Camino Real 3,728 0.93 E 3,730 0.93 ESB 2 4,000
Note:
*Impacted location. No HCM Analysis required for LOS F locations With Update impacts per performance criteria.
3.6 Alternative 2 Peak Hour Freeway Ramp Analysis
The ramp analysis methodology for Alternative 2 is consistent with that applied for Buildout Cumulative With Update. Table 3.5 displays the freeway ramp interchange, ramp type, number of lanes, peak hour capacity, Iteris, Inc. | 76
City Council
21 –
31 4/16/2024
IBC VISION PLAN 2018 TRAFFIC STUDY UPDATE –
ALTERNATIVES ANALYSIS
Final
volumes, densities, and LOS. Appendix C presents detailed HCS worksheets for ramp analysis. When compared to the Buildout Cumulative With Update scenario, there is one additional deficient location at the Southbound SR-55 Off-Ramp to Baker Street. Impacts on freeway ramps are addressed in Section 3.7 in accordance with the impact criteria agreed to by the City and Caltrans. The deficient ramp locations are:
AM Peak Hour:
I-5
I-405
Northbound
Northbound
Off-Ramp to Jamboree Road
Off-Ramp to Jamboree Road
Off-Ramp to MacArthur Boulevard
Off-Ramp to Jamboree Road
Off-Ramp to MacArthur Boulevard
Direct On-Ramp from Fair Drive
On-Ramp from Paularino Avenue
Off-Ramp to Paularino Avenue
Off-Ramp to Dyer Road
Southbound
Northbound
Southbound
SR-55
SR-73 Northbound
Southbound
Off-Ramp to Birch Street
Off-Ramp to MacArthur Boulevard
Off-Ramp to Campus Drive
PM Peak Hour:
I-5 Northbound
Southbound
Northbound
Off-Ramp to Jamboree Road
Direct On-Ramp from Jamboree Road
Direct On-Ramp from Bristol Street*
Off-Ramp to Bristol Street
I-405
Southbound
Northbound
Off-Ramp to Jamboree Road
SR-55 Direct On-Ramp from Fair Drive
On-Ramp from Paularino Avenue
Direct On-Ramp from MacArthur Boulevard
On-Ramp from Edinger Avenue
On-Ramp from McFadden Avenue
Off-Ramp to Victoria StreetSouthbound
Northbound
Off-Ramp to Baker Street
Off-Ramp to Paularino Avenue
On-Ramp North of University Drive from MacArthur Boulevard On-Ramp from Jamboree Road
Off-Ramp to Birch Street
SR-73
On-Ramp from Campus Drive
Off-Ramp to Bear Street
Southbound Off-Ramp to MacArthur Boulevard
*Denotes freeway ramp impacts.
Figure 3.5 and Figure 3.6 graphically depict the Alternative 2 freeway and ramp deficiencies.
Iteris, Inc. | 77
City Council
21 –
32 4/16/2024
IBC VISION PLAN 2018 TRAFFIC STUDY UPDATE –
ALTERNATIVES ANALYSIS
Final
Table 3.5 – Alternative 2 Peak Hour Freeway Ramp LOS
RAMP
CAPACITY
BUILDOUT CUMULATIVE WITH UPDATE
AM PEAK HOUR PM PEAK HOUR
ALTERNATIVE 2
AM PEAK HOUR PM PEAK HOUR
INTERCHANGE
Culver Dr
RAMP TYPE
SB On Direct
SB On Loop
SB Off
NB On Loop
NB On Direct
NB Off
SB On Direct
SB On Loop
SB Off
1 1
2 2
1 1
2 2
2 2
2 1
2 3
1 2
2 2
1 1
1 2
1 1
2 1
1 2
2 1
2 1
2 2
2 2
1 1
1 2
1 1
1 1
2 1
1 1
2 1
1 1
1,000
1,000
500
1,000
1,000
500
1,000
1,000
500
1,000
1,000
500
335
597
841
750
653
504
401
862
1,160 0.39
570
480
1,693 1.13
690 0.46
0.37 0.66
0.37 0.50
0.73 0.34
0.27 0.57
B
C
B
B
D
B
A
C
B
C
B
F
B
C
B
B
C
C
C
B
C
C
B
B
B
B
D
C
B
A
F
559
300
1,811 0.80
480
175
763
1,420 0.95
440 0.29
1,324 0.44
570
300
1,444 0.96
770
970
562
1,024 0.46
1,040 0.69
0.62 0.33
C
B
D
B
A
C
E
A
B
C
A
E
334
595
840
750
652
509
401
852
1,160
580
480
1,693
690
1,090
696
1,072
892
813
840
500
770
930
570
430
1,087
740
1,250
1,228
810
365
2,690
640
1,390
2,663
620
2,544
550
2,601
1,104
993
160
673
824
517
0.37 0.66
0.37 0.50
0.72 0.34
0.27 0.57
0.39 0.54
0.44 1.13
0.46 0.61
0.46 0.48
0.59 0.54
0.56 0.33
0.51 0.62
0.38 0.48
0.36 0.49
0.83 0.55
0.45 0.24
1.20 0.43
0.77 1.18
0.34 1.13
0.37 1.73
0.74 0.44
0.18 0.45
0.55 0.57
0.56 0.83
0.43 0.29
0.51 1.12
0.12 0.37
B
C
B
B
D
B
A
C
B
C
B
F
B
C
B
B
C
C
C
B
C
C
B
B
B
B
D
C
B
A
F
559 0.62
300 0.33
C
B
D
B
A
C
E
A
B
C
A
E
1,811 0.80
480 0.32
175 0.19
767 0.51
1,420 0.95
440 0.29
1,322 0.44
570 0.53
300 0.28
1,444 0.96
760 0.51
970 0.54
554 0.37
1,021 0.45
1,040 0.69
768 0.51
1,020 0.68
492 0.33
901 0.60
870 0.58
1,242 0.83
400 0.44
1,507 0.5
290 0.19
430 0.29
1,437 0.64
1,562 0.87
701 0.47
2,111 0.94
630 0.42
970 0.54
1,843 0.82
1,380 0.77
1,146 0.51
1,270 0.85
932 0.62
1,127 0.75
951 0.42
230 0.26
1,430 0.95
2,056 1.37
657 0.73
2,086 0.93
1,141 0.76
778 0.52
331 0.37
1,616 0.72
1,981 1.32
146 0.10
1,153 0.77
0.32 0.19
0.51 Jamboree Rd NB On Loop
NB On Direct
NB Off
0.53 0.44
0.53 0.28
SB On
NB On
NB Off
SB Off
SB On
NB On
NB Off
SB Off
1,000
1,000 1,090 0.61
0.51 0.54
0.37 C
C
B
B
C
C
C
B
C
C
D
B
B
A
A
C
D
B
E
B
C
D
D
B
D
C
D
B
A
E
C
C
B
B
C
C
C
B
C
C
D
B
B
A
A
C
D
B
E
B
C
D
D
C
D
C
D
B
A
E
Tustin Ranch Rd 500
500
1,000
1,000
500
500
500
1,000
1,000
1,000
500
1,000
1,000 1,250 0.83
500
1,000
1,000
500
698
1,072 0.48
0.47 892
813
840
500
760
930
570
430
0.59 0.54
0.56 0.33
0.51 0.62
0.38 0.48
767
1,010 0.67
0.51Red Hill Ave
503
901
870
1,240 0.83
400 0.44
1,505 0.50
290
430
1,431 0.64
1,560 0.87
700
2,091 0.93
630
970
1,843 0.82
1,370 0.76
1,135
1,250 0.83
931 0.62
1,114 0.74
952
230
1,386 0.92
2,058 1.37
655
2,084 0.93
1,143 0.76
795
332
1,615 0.72
1,971 1.31
146
0.34 0.60
0.58 SB Off
NB OnNewport Blvd
SB On Direct
SB On Loop
SB Off
NB On Loop
NB On Direct
NB Off
SB On Direct
SB On Loop
SB Off
NB On Loop
NB On Direct
NB Off
1,089 0.36
740 0.49Culver Dr 0.19
0.29 1,228 0.55
811
365
2,688 1.19
640 0.43
0.45 0.24 0.47
Jamboree Rd 1,000
1,000 1,390 0.77
B
D
F
B
F
0.42 0.54
B
D
F
B
F
500
1,000
500
1,000
500
2,659 1.18
620 0.34
2,554 1.14
540 0.36
2,600 1.73
SB Direct On
SB Off 0.5MacArthur Blvd
Bristol St
NB On
NB Off
B
F
B
F
SB Loop On
SB Off
NB On Loop
NB On Direct
NB Off
SB Direct On
SB Off
NB Direct On
NB Off
SB Direct On
SB Off
NB Direct On
NB Off
1,000 1,112 0.74 D
B
A
B
C
C
C
D
B
A
C
F
D
B
A
B
C
C
C
D
B
A
C
F
500
1,000
1,000
500
1,000
500
993
160
672
824
516
0.44 0.18
0.45 0.55
0.57 0.42
0.26 31.5 D
F
D
E
D
C
B
D
F
F
D
E
D
C
B
D
F
0.73 1,239 0.55 1,254
1,249
651
Victoria St 1,000 1,252 0.83
500
1,000
500
1,000 1,691 1.13
500
676
257
1,138 0.51
0.45 0.29
0.53 0.37 262
1,152
1,679
178
Fair Dr
176
559
0.12 0.37
A
B
0.10 A
D
A
B
A
DBaker St SB On 1,000 1,150 0.77 558
Iteris, Inc. | 78
City Council
21 –
33 4/16/2024
IBC VISION PLAN 2018 TRAFFIC STUDY UPDATE –
ALTERNATIVES ANALYSIS
Final
RAMP
CAPACITY
BUILDOUT CUMULATIVE WITH UPDATE
AM PEAK HOUR PM PEAK HOUR
ALTERNATIVE 2
AM PEAK HOUR PM PEAK HOUR
INTERCHANGE RAMP TYPE
SB Off
NB Off
SB Off
NB On
SB On Direct
SB On Loop
SB Off
NB On Loop
NB On Direct
NB Off
1 1
1 1
1 1
2 1
1 2
1 1
1 1
1 1
1 1
1 1
1 2
1 1
1 1
1 1
1 1
1 1
1 2
1 1
2 1
1 1
1 1
2 2
1 1
500
500
500
979
1,243 0.83
1,741 1.16
0.65 C
D
F
1,323 0.88
1,021 0.68
1,470 0.98
1,210 1.34
D
C
E
980
1,207
1,750
1,561
990
210
1,992
770
300
1,732
950
809
881
430
640
1,445
1,014
1,119
961
824
614
601
1,215
519
150
1,015
454
219
1,377
744
991
1,190
474
1,403
1,087
1,827
2,342
999
830
400
724
250
1,217
556
359
0.65 0.80
1.17 1.73
0.66 0.23
0.89 0.51
0.33 0.77
0.63 0.54
0.59 0.29
0.71 0.96
0.68 0.75
0.64 0.55
0.41 0.27
0.81 0.35
0.10 0.68
0.30 0.15
0.92 0.50
0.66 0.79
0.32 0.62
0.72 1.22
1.04 0.67
0.55 0.27
0.48 0.17
0.41 0.25
0.24 0.69
C
D
F
1,349 0.9
1,020 0.68
E
C
E1,498 1.00
1,220 1.36
837 0.56
747 0.83
1,018 0.45
627 0.42
961 1.07
1,180 0.52
1,255 0.84
570 0.38
500 0.33
1,190 0.79
680 0.76
475 0.32
936 0.62
580 0.39
1,459 0.97
635 0.42
609 0.41
958 0.43
1,566 1.04
767 0.51
360 0.24
479 0.32
1,201 0.80
1,212 0.81
1,403 0.94
1,194 0.80
1,866 1.24
820 0.55
950 0.63
821 0.36
1,985 1.32
1,567 1.04
1,571 0.70
3,281 2.19
740 0.49
390 0.26
1,586 1.06
470 0.31
1,301 0.43
1,388 0.62
1,172 0.78
528 0.35
Paularino Ave 1,000 1,570 1.74
1,000 1,000 0.67
1,000
500
1,000
1,000
500
1,000
500
F F F F
C
A
D
C
B
D
C
C
C
A
C
E
C
D
C
C
B
A
D
B
A
C
B
A
E
839
738
0.56 0.82
C
D
B
B
E
C
D
B
B
D
D
B
C
B
E
B
B
B
E
C
A
B
D
D
E
D
F
C
C
B
F
E
C
F
B
A
E
B
B
C
D
B
C
A
D
C
B
D
C
C
C
A
C
E
C
D
C
C
B
A
D
B
A
C
A
A
E
C
D
B
B
E
C
D
B
B
D
D
B
C
B
E
B
B
B
E
C
A
B
D
D
E
D
F
C
C
B
F
E
C
F
B
A
E
B
B
C
D
B
200
1,981 0.88
770
310
1,704 0.76
960
852
830
430
640
0.22 1,018 0.45MacArthur Blvd 0.51
0.34 625
977
0.42 1.09
1,161 0.52
1,249 0.83SB On 0.64
0.57 0.55
0.29 0.71
SB Off Loop
SB Off to Grand
NB On Direct
NB On Loop
NB Off
SB On
SB Off
NB On
NB Off
SB On
SB Off
NB On
NB Off
SB On
SB Off
NB On
SB On
570
499
0.38 0.33500Dyer Rd 1,000
1,000
500
1,190 0.79
680
475
936
580
0.76 0.32
0.62 0.39
1,445 0.96
1,000 1,022 0.68
500
1,000
500
1,000
500
1,120 0.75Edinger Ave 957
834
634
602
0.64 0.56
0.42 0.27
1,459 0.97
625
594
955
0.42 0.40
0.42McFadden Ave
Bison Ave
1,000 1,199 0.80 1,558 1.04
500
1,000
500
1,000
1,000
500
1,000
1,000 1,012 0.67
500
1,000
500
1,000 1,092 0.73
500
500
1,000
1,000
500
500
1,000
1,000 1,215 0.40
520
150
1,015 0.68
463
218
1,371 0.91
723 0.48
0.35 0.10
770
360
482
0.51 0.24
0.32 0.31
0.15 1,201 0.80
1,208 0.81
1,403 0.94
1,203 0.80
1,858 1.24
SB OffMacArthur Blvd NB On s/o University Dr
NB On n/o University Dr
SB Off
SB On
SB Off
NB On
NB Off
SB Off
NB On
SB On
SB Off
NB Off
NB On
SB On
NB Off
NB On
SB Off
B
C
D
B
C
D
F
B
C
D
B
C
D
F
University Dr
Jamboree Rd
1,180 0.79
476 0.32
1,399 0.62
820
950
837
0.55 0.63
0.37 1,991 1.33
1,563 1.04
1,553 0.69
3,298 2.20
Birch St 1,832 1.22
2,339 1.04 E ECampus Dr 999
830
390
724
250
0.67 0.55
0.26 0.48
0.17 C
C
A
B
A
B
A
A
C
C
C
A
B
A
B
A
A
C
740
391
0.49 0.26SR-73 at Bear
Jamboree Rd
1,582 1.05
501 0.33
1,329 0.44
1,386 0.62
1,176 0.78
250
1,000
500
559
358
1,034 0.69
0.25 0.24Walnut Ave 529 0.35 1,041
Note:
1HCM2010 limits Ramp HCM Density calculations with freeway lanes to 5 or less. HCM density was adjusted to include freeway lanes of 5 or more lanes.
Iteris, Inc. | 79
City Council
21 –
34 4/16/2024
IBC VISION PLAN 2018 TRAFFIC STUDY UPDATE –
ALTERNATIVES ANALYSIS
Final
Figure 3.5 – Alternative 2 Freeway AM Peak Hour Deficiencies Iteris, Inc. | 80
City Council
21 –
35 4/16/2024
IBC VISION PLAN 2018 TRAFFIC STUDY UPDATE –
ALTERNATIVES ANALYSIS
Final
Figure 3.6 – Alternative 2 Freeway PM Peak Hour Deficiencies Iteris, Inc. | 81
City Council
21 –
36 4/16/2024
IBC VISION PLAN 2018 TRAFFIC STUDY UPDATE –
ALTERNATIVES ANALYSIS
Final
3.7 Alternative 2 Future Improvements and Mitigations
Table 3.6 shows the number of significantly impacted locations for arterials, intersections, freeway mainline and ramps. Because the land-use is identical and there is only one roadway network difference between the Alternative 2 and Buildout Cumulative With Update scenarios, there are few significant impacts observed.
Improvement strategies for each are discussed in turn.
Table 3.6 – Alternative 2 Number of Impacted Locations in the Study Area
FACILITY
Arterial Segments
Intersections
Freeway Mainline
Freeway Ramps
Total
ALTERNATIVE 2
0 2
0 1
2 Intersections
Deficient intersections within the IBC study area fall under two categories: significant impact and cumulative deficiency. Impacts are determined using the definition of significant impacts from each city’s traffic impact analysis protocol, presented in Chapter 2 of the 2018 IBC Vision Plan Two-Year Traffic Study Update. For the cities of Costa Mesa, Santa Ana, and Tustin, significant impacts are identified as an increase in intersection ICU of 0.01 or greater under With Update conditions of a deficient intersection when compared to Baseline conditions. For the City of Newport Beach, an impact is identified as an increase of 0.01 or more of the critical movement of a deficient intersection. Cumulative deficiencies are identified as those intersections that fail under both the Baseline and With Update conditions but do not have an update impact as identified by the above noted criteria. The City of Irvine threshold for defining impact is degradation of an intersection from acceptable to deficient LOS, or for a location already deficient in the baseline, an increase of 0.02 or greater of an intersection ICU. For intersections with shared jurisdictional boundaries, the more conservative methodology was employed.
Twenty-four intersections under Alternative 2 are forecast to operate at a deficient LOS. Of those deficient intersections, a significant impact is forecast for two intersections in Alternative 2 and require intersection improvements. Table 3.7 identifies intersections with significant impact deficiencies for the Alternative 2 scenario studied.
Table 3.7 –Alternative 2 Intersections Significantly Impacted in the Study Area
ID LOCATION JURSDICTION MITIGATION REQUIRED
719
720
Flower Street at Segerstrom
Flower Street at MacArthur Boulevard
Santa Ana
Santa Ana
Total Number Locations
Yes
Yes
2 Source: ITAM, City of Irvine, ICU analysis
Iteris, Inc. | 82
City Council
21 –
37 4/16/2024
IBC VISION PLAN 2018 TRAFFIC STUDY UPDATE –
ALTERNATIVES ANALYSIS
Final
Improvements
The development of improvements is consistent with the approach used in the 2018 IBC Vision Plan Two- Year Traffic Study Update. The improvements recommended in this study result in facility operations within acceptable thresholds and are physical improvements rather than operational improvements. Improvements are also analyzed for feasibility based upon potential cost-effectiveness and right-of-way acquisition.
Where applicable, feasible improvements identified in the 2010 and 2015 IBC Vision Plans that have yet to be implemented were recommended as improvements where appropriate. Additionally, traffic studies and other planning documents were sourced in adjacent jurisdictions to develop improvement strategies for intersection deficiencies.
Figure 3.7 identifies the locations of the intersection impacts and cumulative deficiencies with a description of the improvement for each location.
Fair-share
As done in the 2018 IBC Vision Plan Two-Year Traffic Study Update, for the sole purpose of providing a reference, a fair-share methodology has been performed to evaluate what the financial participation of improving impacts would be. The same formula is used to calculate the fair-share proportion as in the 2018 IBC Vision Plan Two-Year Traffic Study Update. Detailed fair-share calculation worksheets are included in Appendix E.
Iteris, Inc. | 83
City Council
21 –
38 4/16/2024
IBC VISION PLAN 2018 TRAFFIC STUDY UPDATE –
ALTERNATIVES ANALYSIS
Final
Figure 3.7 – Alternative 2 IBC Vision Study Area Improvement Locations Iteris, Inc. | 84
City Council
21 –
39 4/16/2024
IBC VISION PLAN 2018 TRAFFIC STUDY UPDATE –
ALTERNATIVES ANALYSIS
Final
The following sections discuss the intersection deficiencies and recommended mitigations for each jurisdiction within the study area.
3.7.1 City of Santa Ana
There are two location in the City of Santa Ana which require mitigation. Table 3.8 identifies the improvement strategy and corresponding ICUs. The following mitigation is recommended for the intersection that is significantly impacted by the proposed plan update:
Intersection #719: Flower Street and Segerstrom Avenue
This intersection is deficient under the Buildout Cumulative With Update and is forecast to have a significant impact under the Alternative 2 scenario during the PM peak. Because of the high westbound volume on Segerstrom Avenue in the morning, the recommended improvement is to widen the road to add a westbound right-turn lane. The improvement would bring the deficient intersection back to an acceptable LOS.
Intersection #720: Flower Street and MacArthur Boulevard This intersection is forecast to have a significant impact under the Alternative 2 scenario during the PM peak. Because of the high eastbound volume on MacArthur Boulevard during the AM Peak hour, the recommended improvement is to widen the road to add an eastbound right-turn lane. The improvement would bring the deficient intersection back to an acceptable LOS.
Table 3.8 – City of Santa Ana Intersection Improvements ALTERNATIVE 2 AFTERALTERNATIVE 2
AM PM
IMPROVEMENT IMPROVEMENT
STRATEGYID INTERSECTION
AM PM
Flower St at
Segerstrom Ave
Flower St at
MacArthur
719
720
0.84 0.91
D
E
1.02 0.88
E 0.84
0.86 D
D
0.97 0.88
E Add WBR
Add EBR
1.1%
1.0%D D
Boulevard
*Fair-share percentage is shown for informational and comparison purposes only
3.7.2 Freeway Ramps
There are 24 freeway ramp which are deficient under the Alternative 2 future scenarios. The volumes are generally consistent with the Buildout With Update scenario forecast volumes, with one ramp experiencing an increase in the peak hour volume of over 30 vehicles per hour, triggering an impact under the impact criteria as agreed to by the City of Irvine and Caltrans. Table 3.9 identifies the one impacted freeway ramp and fair-shares under the Alternative 2 conditions for information and future planning purposes.
Table 3.9– Alternative 2 Freeway Ramp Plan Update Impacts and Fair-Share RAMP
CAPACITY
BUILDOUT CUMULATIVE WITH
UDPATE ALTERNTIAVE 2 IMPACT IDENTIFIED
AM PEAK HOUR PM PEAK HOUR AM PEAK HOUR PM PEAK HOUR
INTERCHANGE
I-405 Bristol St NB On-Direct 1 1,000 672 0.45 B 1,386 0.92 E 673 0.45 B 1,430 0.95 E +1 +44 * 3.1% Iteris, Inc. | 85
City Council
21 –
40 4/16/2024
IBC VISION PLAN 2018 TRAFFIC STUDY UPDATE –
ALTERNATIVES ANALYSIS
Final
*Fair-share percentage is shown for informational and comparison purposes only Iteris, Inc. | 86
City Council
21 –
41 4/16/2024
IBC VISION PLAN 2018 TRAFFIC STUDY UPDATE –
ALTERNATIVES ANALYSIS
Final
4 COST ESTIMATES
4.1 Cost Estimates for Mitigation Improvements
Planning level cost estimates were developed for each of the required mitigation locations. This involved the development of concept plans for each of the improvements overlaid on recent aerial imagery provided by the City. Unit costs were updated based on recent Caltrans cost estimates and on bid data provided to the City. These unit costs were then applied to the construction requirements identified in the concept plans.
Utility identification, including sewer and overhead electrical lines, were determined to the extent possible from the aerial imagery. Length of turn pocket date was determined from traffic data where appropriate.
Consistent with the 2010 Vision Plan Traffic Fee Nexus Study and the 2015 Update, cost estimates include provisions for the following:
Preliminary project development
Right-of-way
Design Engineering and Administration Cost
Construction Engineering Cost and Administration
Construction Cost
Construction Contingency
4.1.2 Cost Estimates for Alternative 2
Table 4.2 shows the cost estimates for the improvements identified for the Alternative 2. Concept plans are and detailed cost estimates broken down into component categories are provided in Appendix H. Both intersection improvement locations are unique to Alternative 2.
Iteris, Inc. | 87
City Council
21 –
42 4/16/2024
IBC VISION PLAN 2018 TRAFFIC STUDY UPDATE –
ALTERNATIVES ANALYSIS
Final
Table 4.2 – Alternative 2 Cost of Improvements
PD/Construc Right-of- Design/
CM
Total
($ 000's)ID Jurisdiction Intersection Improvement tion
($ 000's)
way
($ 000's)
Alt 2 Only
($ 000's)
Flower Street at
MacArthur
Boulevard
Flower Street at
Segerstrom
Avenue
720
719
Santa Ana
Santa Ana
Add EBR $611 $3,290
$362
$606 $4,507 Yes
YesAdd WBR
All Intersections
$1,814 $1,208 $3,384
$7,891
Iteris, Inc. | 90
City Council
21 –
43 4/16/2024
IBC VISION PLAN 2018 TRAFFIC STUDY UPDATE –
ALTERNATIVES ANALYSIS
Final
5 REFERENCES
City of Irvine General Plan—2006
City of Tustin General Plan—2008
City of Costa Mesa General Plan—2000
City of Newport Beach General Plan–2006
Irvine City Council Ordinance No. 03-08, April 2003
National Cooperative Highway Research Program Report 255, Transportation Research Board.
ICU Worksheets Methodology, Austin-Foust Associates, Inc.
Irvine Business Complex General Plan Amendment and Rezoning Project Environmental Impact Report, Robert Bein, William Frost and Associates, October 1992 North Irvine Transportation Mitigation (NITM) Program Nexus Study Five Year Review, Parsons Brinckerhoff, July 2008
Irvine Business Complex Vision Plan Traffic Study, March 2010 Parson Brinkerhoff 2012 Citywide Circulation Phasing Report, Iteris, 2013
Irvine Business Complex Vision Plan Traffic Study, January 13 2016, Iteris Iteris, Inc. | 91
City Council
21 –
44 4/16/2024
IBC VISION PLAN 2018 TRAFFIC STUDY UPDATE –
ALTERNATIVES ANALYSIS
Final
6 GLOSSARY OF TRANSPORTATION TERMS
Common Abbreviations
ADT Average Daily Traffic
ITAM
Caltrans
DU
Irvine Traffic Analysis Model
The California Department of Transportation
Dwelling Unit
HCM Highway Capacity Manual
HCS
HOV
ICU
Highway Capacity Software (Software package utilizing the formulae in the Highway Capacity Manual) High Occupancy Vehicle lane
Intersection Capacity Utilization
ITAM
OCTA
OCTAM
TSF
Irvine Traffic Analysis Model
Orange County Transportation Authority
Orange County Transportation Analysis Model
Thousands of Square Feet
V/C Volume/Capacity Ratio
VMT Vehicle Miles Traveled
AUXILIARY LANE: A non-capacity enhancing lane that provides operational benefits to the freeway mainline.
Typically an auxiliary lane extends between an on-ramp and off-ramp to facilitate the weave movement between the interchange without detrimental effects to the mainline through lanes.
AVERAGE DAILY TRAFFIC: The total volume during a year divided by the number of days in a year. Usually only weekdays are included.
BANDWIDTH: The number of seconds of green time available for through traffic in a signal progression.
BOTTLENECK: A constriction along a travelway that limits the amount of traffic that can proceed downstream from its location.
CAPACITY: The maximum number of vehicles that can be reasonably expected to pass over a given section of a lane or a roadway in a given time period.
CHANNELIZATION: The separation or regulation of conflicting traffic movements into definite paths of travel by the use of pavement markings, raised islands, or other suitable means to facilitate the safe and orderly movements of both vehicles and pedestrians.
CLEARANCE INTERVAL: Nearly same as yellow time. lf there is an all red interval after the end of a yellow, then that is also added into the clearance interval.
CRITICAL MOVEMENT: Conflicting intersection turning movements that are found to have the highest ICU for opposing movements; i.e. each of the approaches at a four-legged intersection will contain a critical movement that conflicts with an opposing movement.
DAILY CAPACITY: The daily volume of traffic that will result in a volume during the peak hour equal to the capacity of the roadway.
Iteris, Inc. | 92
City Council
21 –
45 4/16/2024
IBC VISION PLAN 2018 TRAFFIC STUDY UPDATE –
ALTERNATIVES ANALYSIS
Final
DELAY: The time consumed while traffic is impeded in its movement by some element over which it has no control, usually expressed in seconds per vehicle.
DEMAND RESPONSIVE SIGNAL: Same as traffic-actuated signal.
DENSITY: The number of vehicles occupying in a unit length of the through traffic lanes of a roadway at any given instant. Usually expressed in vehicles per mile.
DIRECTIONAL SPLIT: The percent of traffic in the peak direction at any point in time.
DIVERGE AREA (HCM): the two right shoulder lanes plus the auxiliary lane for 1500 feet downstream from the ramp gore point (location where the ramp intersects with the freeway mainline.
DIVERSION: The rerouting of peak hour traffic to avoid congestion.
FORCED FLOW: Opposite of free flow.
FREE FLOW: Volumes are well below capacity. Vehicles can maneuver freely and travel is unimpeded by other traffic.
GAP: Time or distance between successive vehicles in a traffic stream, rear bumper to front bumper.
HEADWAY: Time or distance spacing between successive vehicles in a traffic stream, front bumper to front bumper.
HIGH OCCUPANCY VEHICLE (HOV) LANE: A lane restricted for use by vehicles with 2 or more persons.
INTERCONNECTED SIGNAL SYSTEM: A number of intersections that are connected to achieve signal progression.
LEVEL OF SERVICE: A qualitative measure of a number of factors, which include speed and travel time, traffic interruptions, freedom to maneuver, safety, driving comfort and convenience, and operating costs.
LOOP DETECTOR: A vehicle detector consisting of a loop of wire embedded in the roadway, energized by alternating current and producing an output circuit closure when passed over by a vehicle.
MERGE AREA (HCM): the two right shoulder lanes plus the auxiliary lane for 1500 feet downstream from the ramp gore point (location where the ramp intersects with the freeway mainline.
MINIMUM ACCEPTABLE GAP: Smallest time headway between successive vehicles in a traffic stream into which another vehicle is willing and able to cross or merge.
MIXED USE DEVELOPMENT: The practice of allowing more than one type of lane use in a building or set of buildings. In planning terms, this can mean some combination of residential, commercial, industrial, office, institutional, or other land uses.
Iteris, Inc. | 93
City Council
21 –
46 4/16/2024
IBC VISION PLAN 2018 TRAFFIC STUDY UPDATE –
ALTERNATIVES ANALYSIS
Final
MULTI-MODAL: More than one mode; such as automobile, bus transit, rail rapid transit, and bicycle transportation modes.
OFFSET: the time interval in seconds between the beginning of green at one intersection and the beginning of green at an adjacent intersection.
PLATOON; A closely grouped component of traffic that is composed of several vehicles moving, or standing ready to move, with clear spaces ahead and behind.
ORANGE COUNTY TRANSPORTATION ANALYSIS MODEL (OCTAM): The regional model developed and maintained by OCTA that is the parent model to the City of Irvine subarea model, ITAM.
ORIGIN-DESTINATION SURVEY: A survey to determine the point of origin and the point of destination for a given vehicle trip.
PASSENGER CAR EQUIVALENTS (PGE): One car is one Passenger car Equivalent. A truck is equal to two or three Passenger car Equivalents in that a truck requires longer to start, goes slower, and accelerates slower.
Loaded trucks have a higher Passenger Car Equivalent than empty trucks.
PEAK HOUR: The 60 consecutive minutes with the highest number of vehicles.
PEAK HOUR FACTOR: the period during which peak hour traffic volume is at its highest. Peak Hour factor is determined by calculating the hourly volume divided by the peak rate of flow within the hour, which is the highest 15 minute interval multiplied by four.
PRETIMED SIGNAL: A type of traffic signal that directs traffic to stop and go on a predetermined time schedule without regard to traffic conditions. Also, fixed time signal.
PROGRESSION: A term used to describe the progressive movement of traffic through several signalized intersections.
SCREEN-LINE: An imaginary line or physical feature across which all trips are counted, normally to verify the validity of mathematical traffic models.
SIGNAL CYCLE: The time in seconds required for one complete sequence of signal indications.
SIGNAL PHASE: The part of the signal cycle allocated to one or more traffic movements.
SIGNIFICANT IMPACT (CEQA): Projects can cause significant impacts by direct physical changes to the environment or by triggering reasonably foreseeable indirect physical changes. Physical changes caused by a project can contribute incrementally to cumulative effects that are significant, even if individual changes resulting from a project are limited. You must determine whether the cumulative impact is significant, as well as whether an individual effect is “cumulatively considerable.” This means “the incremental effects of an individual project are significant when viewed in connection with the effects of past projects, the effects of other current projects, and the effects of probable future projects” (CEQA Guidelines Section 15064(h)(1)).
Iteris, Inc. | 94
City Council
21 –
47 4/16/2024
IBC VISION PLAN 2018 TRAFFIC STUDY UPDATE –
ALTERNATIVES ANALYSIS
Final
STARTING DELAY: The delay experienced in initiating the movement of queued traffic from a stop to an average running speed through a signalized intersection.
SYNCHRO: A complete software package for modeling, optimizing, managing and simulating traffic systems.
Synchro implements the HCM methodologies for intersection analysis and is applied for State Highway System ramp termini intersections.
TRANSIT ORIENTED DEVELOPMENT: A mixed-use residential or commercial area designed to maximize access to public transport, and often incorporates features to encourage transit ridership.
TRIP: The movement of a person or vehicle from one location (origin) to another (destination). For example, from home to store to home are two trips, not one.
TRIP-END: one end of a trip at either the origin or destination; i.e. each trip has two trip-ends. A trip-end occurs when a person, object, or message is transferred to or from a vehicle.
TRIP GENERATION RATE: The quality of trips produced and/or attracted by a specific land use stated in terms of units such as per dwelling, per acre, and per 1,000 square feet of floor space.
TRUCK: A vehicle having dual tires on one or more axles, or having more than two axles.
UNBALANCED Flow: Heavier traffic flow in one direction than the other. On a daily basis, most facilities have balanced flow. During the peak hours, flow is seldom balanced in an urban area.
VEHICLE MILES OF TRAVEL: A measure of the amount of usage of a section of highway, obtained by multiplying the average daily traffic by length of facility in miles.
WEAVING AREA: The area of a freeway where there is cross traffic from either a on or off-ramp or transition to another freeway. Typically weaving segments are formed when merge areas are followed closely by diverge areas (within 2,500 feet) and the two are joined by an auxiliary lane requiring the crossing of two or more traffic streams traveling in the same general direction along a significant length of highway without the aid of traffic control devices.
Iteris, Inc. | 95
City Council
21 –
48 4/16/2024
IBC VISION PLAN 2018 TRAFFIC STUDY UPDATE –
ALTERNATIVES ANALYSIS
Final
7 APPENDICES
Appendix A: ICU Worksheets
Innovating Through Informatics™
City Council
21 –
49 4/16/2024
IBC VISION PLAN 2018 TRAFFIC STUDY UPDATE
Final
Alternative 2 ICU Worksheets
Iteris, Inc. | 5
City Council
21 –
50 4/16/2024
31 . Daimler St. at Alton Pkwy.
ITAM 18 Alt 2 (IRVINE ISEC)
AM PK HOUR
32 . Daimler St. at McGaw Av.
ITAM 18 Alt 2 (IRVINE ISEC)
PM PK HOUR AM PK HOUR PM PK HOUR
VOL V/CLANES CAPACITY VOL V/C VOL V/C LANES CAPACITY VOL V/C NBL
NBT
NBR
1 1
0 1700
1700
0 72
19 40
.04*
.03
196
151
107
.12*
.15
NBL
NBT
NBR
0 1
d
0 1700
1700
58 38
70 11 {.01}*
.06*
.04
44 .03
.07126
SBL
SBT
SBR
1 1
0 1700
1700
0 65
92 115
.04
.12*
44 35
82 .03
.07*
SBL
SBT
SBR
0 1
d
0 1700
1700
150 {.09}* 96
46 18
51 16
.12
.01
.08*
.01
EBL
EBT
EBR
1 2
1 1700
3400
1700
87 1414
230
.05
.42*
.14
162
979
94 .10*
.29
.06
EBL
EBT
EBR
1 2
0 1700
3400
0 3
10 7
.00
.01*
5 111
23 .00
.04*
WBL
WBT
WBR
1 2
1 1700
3400
1700
88 972
27 .05*
.29
.02
51 1262
107
.03
.37*
.06
WBL
WBT
WBR
1 2
0 1700
3400
0 82
127
29 .05*
.05
124
72 83
.07*
.04
.05
Clearance Interval
TOTAL CAPACITY UTILIZATION
.05*
.68
.05*
.71
Clearance Interval .05*
.26
.05*
.25TOTAL CAPACITY UTILIZATION
42 . Red Hill Av. at Barranca Pkwy.
ITAM 18 Alt 2 (IRVINE ISEC)
AM PK HOUR
43 . Red Hill Av. at Deere Av.
ITAM 18 Alt 2 (IRVINE ISEC)
PM PK HOUR AM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C LANES CAPACITY VOL V/C VOL V/C NBL
NBT
NBR
2 4
d
3400
6800
1700
180
639
132
.05 488 .14
.35*
.25
NBL
NBT
NBR
1 3
d
1700
5100
1700
79 882
157
.05*
.17
.09
31 2932
48 .02
.57*
.03
.09* 2382
.08 424
SBL
SBT
SBR
2 4
d
3400
6800
1700
536
1124
210
.16*
.17
.12
457
800
245
.13*
.12
.14
SBL
SBT
SBR
1 3
1 1700
5100
1700
105
1705
140
.06 80 .05*
.21
.01
.33* 1053
.08 24
EBL
EBT
EBR
2 4
0 3400
6800
0 262
1882
306
.08
.32* 1079
122
299 .09*
.18
EBL
EBT
EBR
1 1
0 1700
1700
0 16
91 34
.01
.07*
110
122
100
.06
.13*
WBL
WBT
WBR
2 4
1 3400
6800
1700
500
820
260
.15*
.12
.15
198
1857
619
.06
.27*
.36
WBL
WBT
WBR
1 1
1 1700
1700
1700
11 32
28 .01*
.02
.02
117
65 209
.07*
.04
.12
Clearance Interval .05*
.77
.05*
.89
Clearance Interval
TOTAL CAPACITY UTILIZATION
.05*
.51
.05*
.87TOTAL CAPACITY UTILIZATION
Friday, December 14, 2018 Page 1
City Council
21 –
51 4/16/2024
44 . Red Hill Av. at Alton Pkwy.
ITAM 18 Alt 2 (IRVINE ISEC)
AM PK HOUR
45 . Red Hill Av. at McGaw Av.
ITAM 18 Alt 2 (IRVINE ISEC)
PM PK HOUR AM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C LANES CAPACITY VOL V/C VOL V/C NBL
NBT
NBR
1 3
1 1700
5100
1700
300
634
474
.18*
.12
.28
193
2139
195
.11
.42*
.11
NBL
NBT
NBR
2 3
1 3400
5100
1700
253
1223
606
.07 85 .03
.41*
.39
.24* 2085
.36 671
SBL
SBT
SBR
1 3
1 1700
5100
1700
411
1017
415
.24
.20*
.24
220
980
190
.13*
.19
.11
SBL
SBT
SBR
2 3
d
3400
5100
1700
242
1189
100
.07*
.23
.06
130
1510
40 .04*
.30
.02
EBL
EBT
EBR
2 2
1 3400
3400
1700
256
806
275
.08
.24*
.16
328
855
308
.10
.25*
.18
EBL
EBT
EBR
1 2
0 1700
3400
0 40
93 67
.02
.05*
95 230
303
.06
.14*
.18
WBL
WBT
WBR
2 2
1 3400
3400
1700
258
766
201
.08*
.23
.12
403
897
503
.12*
.26
.30
WBL
WBT
WBR
2 2
0 3400
3400
0 343
168
127
.10*
.09
529
255
354
.16*
.15
.21
Right Turn Adjustment
Clearance Interval
NBR .08*
.05*
Right Turn Adjustment
Clearance Interval
NBR .04*
.05*.05*
.97
.05*
.80TOTAL CAPACITY UTILIZATION .83 TOTAL CAPACITY UTILIZATION .55 46 . Red Hill Av. at Reynolds Av.
ITAM 18 Alt 2 (IRVINE ISEC)
AM PK HOUR
47 . Red Hill Av. at MacArthur Blvd.
ITAM 18 Alt 2 (IRVINE ISEC)
AM PK HOURPM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C LANES CAPACITY VOL V/C VOL V/C NBL
NBT
NBR
1 3
d
1700
5100
1700
280
1800
461
.16*
.35
.27
74 2300
249
.04*
.45
.15
NBL
NBT
NBR
2 3
0 3400
5100
0 85
909
20 .03
.18* 1152
36 142 .04
.23*
SBL
SBT
SBR
1 3
d
1700
5100
1700
49 1120
30 .03 11 .01
.44*
.01
SBL
SBT
SBR
2 3
f
3400
5100
495
734
373
.15*
.14
653
1020
926
.19*
.20.22* 2259
.02
.03
.01
16 EBL
EBT
EBR
0 0
1 0
0 1700
0 0
50 0
0 231
EBL
EBT
EBR
2 3
d
3400
5100
1700
1111
1315
127
.33*
.26
.07
677
627
86 .20*
.12
.05.14
WBL
WBT
WBR
0 0
1 0
0 1700
0 0
20 0
0 100
WBL
WBT
WBR
1 3
f
1700
5100
50 422
820
.03
.08*
120
993
1268
.07
.19*
.06
Right Turn Adjustment
Clearance Interval
Multi .15*
.05*
Clearance Interval
TOTAL CAPACITY UTILIZATION
.05*
.79
.05*
.86
.05*
.43TOTAL CAPACITY UTILIZATION
Friday, December 14, 2018
.68
City Council
21 –
52 4/16/2024
48 . Red Hill Av. at Sky Park N
ITAM 18 Alt 2 (IRVINE ISEC)
AM PK HOUR
49 . Red Hill Av. at Main St.
ITAM 18 Alt 2 (IRVINE ISEC)
PM PK HOUR AM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C LANES CAPACITY VOL V/C VOL V/C NBL
NBT
NBR
1 3
d
1700
5100
1700
87 864
112
.05
.17*
.07
78 998
47 .05
.20*
.03
NBL
NBT
NBR
2 2
1 3400
3400
1700
192
790
546
.06
.23*
.32
413
990
398
.12*
.29
.23
SBL
SBT
SBR
1 3
d
1700
5100
1700
91 566
91 .05*
.11
.05
89 876
62 .05*
.17
.04
SBL
SBT
SBR
2 2
0 3400
3400
0 103
417
132
.03*
.16
82 648
318
.02
.28*
EBL
EBT
EBR
1 1
1 1700
1700
1700
26 18
47 .02*
.01
.03
76 46
108
.04*
.03
.06
EBL
EBT
EBR
2 3
0 3400
5100
0 228
1921
243
.07
.42*
181
870
163
.05*
.20
WBL
WBT
WBR
1 1
0 1700
1700
0 18
12 50
.01
.04*
78 42
119
.05
.09*
WBL
WBT
WBR
2 3
0 3400
5100
0 170
496
103
.05*
.12
449
2010
88 .13
.41*
Clearance Interval .05*
.33
.05*
.43
Right Turn Adjustment
Clearance Interval
NBR .05*
.05* .05*
.91
TOTAL CAPACITY UTILIZATION
TOTAL CAPACITY UTILIZATION .83
66 . Gillette Av. at Alton Pkwy.
ITAM 18 Alt 2 (IRVINE ISEC)
AM PK HOUR
67 . Gillette Av. at McGaw Av.
ITAM 18 Alt 2 (IRVINE ISEC)
PM PK HOUR
VOL V/C
AM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C LANES CAPACITY VOL V/C VOL V/C
NBL
NBT
NBR
0 1
d
0 1700
1700
90 {.05}* 355 {.21}* NBL
NBT
NBR
1 1
0 1700
1700
0 119
53 37
.07*
.05
238
311
91 .14
.24*0 .05
.03
0 .21
.2750 467
SBL
SBT
SBR
0 0
0 0
0 0
0 0
0 0
0 0
SBL
SBT
SBR
1 1
d
1700
1700
1700
33 120
76 .02
.07*
.04
59 63
207
.03*
.04
.12
EBL
EBT
EBR
0 2
0 0
3400
0 0
1400
268
0 EBL
EBT
EBR
1 2
0 1700
3400
0 209
613
47 .12*
.19
194
833
36 .11*
.26.49* 1163
104
.37
WBL
WBT
WBR
1 2
0 1700
3400
0 152
1110
0 .09*
.33
86 1495
0 .05
.44*
WBL
WBT
WBR
1 2
0 1700
3400
0 94
479
29 .06
.15*
40 690
47 .02
.22*
Right Turn Adjustment
Clearance Interval
NBR .01*
.05*
Clearance Interval .05*
.46
.05*
.65
.05*
.68
TOTAL CAPACITY UTILIZATION
TOTAL CAPACITY UTILIZATION
Friday, December 14, 2018
.71
City Council
21 –
53 4/16/2024
70 . Gillette Av. at Main St.
ITAM 18 Alt 2 (IRVINE ISEC)
71 . Armstrong St. at Barranca Pkwy.
ITAM 18 Alt 2 (IRVINE ISEC)
AM PK HOURAM PK HOUR PM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C LANES CAPACITY VOL V/C VOL V/C NBL
NBT
NBR
2 1
1 3400
1700
1700
36 6
78 .01*
.00
.05
255
154
392
.08
.09*
.23
NBL
NBT
NBR
1 2
0 1700
3400
0 100
83 97
.06*
.05
.06
488
294
469
.29*
.17
.28
SBL
SBT
SBR
2 1
d
3400
1700
1700
89 99
162
.03
.06*
.10
195
13 192
.06*
.01
.11
SBL
SBT
SBR
1 1
1 1700
1700
1700
36 48
37 .02
.03*
.02
138
117
144
.08
.07*
.08
EBL
EBT
EBR
2 4
f
3400
6800
276
1363
326
.08*
.20
175
1623
79 .05*
.24
EBL
EBT
EBR
1 4
d
1700
6800
1700
145
1537
228
.09*
.23
.13
118
1657
165
.07*
.24
.10
WBL
WBT
WBR
2 3
0 3400
5100
0 285
1082
148
.08
.24* 1571
174
48 .01
.34*
WBL
WBT
WBR
2 4
1 3400
6800
1700
274
2003
192
.08 148 .04
.26*
.06
.29* 1752
.11 109
Right Turn Adjustment
Clearance Interval
NBR .03*
.05*
Clearance Interval
TOTAL CAPACITY UTILIZATION
.05*
.52
.05*
.74
.05*
TOTAL CAPACITY UTILIZATION .44 .62
73 . Armstrong St. W. at Alton Pkwy.
ITAM 18 Alt 2 (IRVINE ISEC)
AM PK HOUR
74 . Armstrong St. E. at Alton Pkwy.
ITAM 18 Alt 2 (IRVINE ISEC)
AM PK HOURPM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C LANES CAPACITY VOL V/C VOL V/C NBL
NBT
NBR
1 0
1 1700
0 1700
30 0
50 .02*
.03
100
0 220
.06*
.13
NBL
NBT
NBR
0 0
0 0
0 0
0 0
0 0
0 0
SBL
SBT
SBR
0 0
0 0
0 0
0 0
0 0
0 0
SBL
SBT
SBR
1 0
1 1700
0 1700
32 0
80 .02*
.05
143
0 178
.08*
.10
EBL
EBT
EBR
0 3
d
0 5100
1700
0 1130
99 0 EBL
EBT
EBR
1 3
0 1700
5100
0 171
978
0 .10*
.19
217
1017
0 .13*
.20.22* 1070 .21*
.01.06 22
WBL
WBT
WBR
1 3
0 1700
5100
0 111
960
0 .07*
.19
78 1190
0 .05*
.23
WBL
WBT
WBR
0 3
d
0 5100
1700
0 1010
99 0
.20* 1102 .22*
.05.06 93
Right Turn Adjustment
Clearance Interval
NBR .03*
.05*
Clearance Interval
TOTAL CAPACITY UTILIZATION
.05*
.37
.05*
.48
.05*
.36TOTAL CAPACITY UTILIZATION
Friday, December 14, 2018
.40
City Council
21 –
54 4/16/2024
77 . MacArthur Bl. at Sky Park E.
ITAM 18 Alt 2 (IRVINE ISEC)
AM PK HOUR
78 . MacArthur Bl. at Main St.
ITAM 18 Alt 2 (IRVINE ISEC)
PM PK HOUR AM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C LANES CAPACITY VOL V/C VOL V/C NBL
NBT
NBR
1 3
0 1700
5100
0 161
1158
0 .09*
.23
118
2179
0 .07
.43*
NBL
NBT
NBR
2 4
f
3400
6800
691
1176
1422
.20*
.17
785
1609
657
.23*
.24
SBL
SBT
SBR
0 4
0 0
6800
0 0
1542
201
0 SBL
SBT
SBR
2 4
1 3400
6800
1700
572
1011
107
.17 369 .11
.17*
.04
.26* 1240
82 .19 .15* 1159
.06 72
EBL
EBT
EBR
2 0
1 3400
0 1700
36 0
73 .01*
.04
181
0 250
.05*
.15
EBL
EBT
EBR
1 3
1 1700
5100
1700
63 970
828
.04
.19*
.49
128
826
757
.08
.16*
.45
WBL
WBT
WBR
0 0
0 0
0 0
0 0
0 0
0 0
WBL
WBT
WBR
2 3
f
3400
5100
445
573
252
.13*
.11
848
1116
616
.25*
.22
Clearance Interval
TOTAL CAPACITY UTILIZATION
.05*
.41
.05*
.53
Right Turn Adjustment
Clearance Interval
EBR .10*
.05*
EBR .06*
.05*
Note: Assumes Right-Turn Overlap for EBR
TOTAL CAPACITY UTILIZATION .82 .92
79 . MacArthur Bl. at I-405 NB Ramps
ITAM 18 Alt 2 (IRVINE ISEC)
AM PK HOUR
80 . MacArthur Bl. at I-405 SB Ramps
ITAM 18 Alt 2 (IRVINE ISEC)
AM PK HOURPM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C LANES CAPACITY VOL V/C VOL V/C NBL
NBT
NBR
0 4
2 0
6800
3400
0 1984
360
0 NBL
NBT
NBR
0 4
1 0
6800
1700
0 1525
464
0 2974
801
.29* 2616 .38*
.23
.22
.27
.44*
.47.11 770
SBL
SBT
SBR
2 4
0 3400
6800
0 190
2085
0 .06*
.31
500
2312
0 .15*
.34
SBL
SBT
SBR
2 4
1 3400
6800
1700
156
1893
638
.05 579 .17*
.26
.21
.28* 1781
.38 352
EBL
EBT
EBR
0 0
0 0
0 0
0 0
0 0
0 0
EBL
EBT
EBR
0 0
0 0
0 0
0 0
0 0
0 0
WBL
WBT
WBR
2 0
2 3400
0 3400
1265
0 1336
.37*
.39
488
0 444
.14*
.13
WBL
WBT
WBR
2 1
f
3400
1700
1197
322
785
.35*
.19
559
190
406
.16*
.11
Clearance Interval .05*
.77
.05*
.72
Clearance Interval
TOTAL CAPACITY UTILIZATION
.05* .05*
TOTAL CAPACITY UTILIZATION
Friday, December 14, 2018
.68 .68
City Council
21 –
55 4/16/2024
81 . MacArthur Bl. at Business Center Dr.
ITAM 18 Alt 2 (IRVINE ISEC)
82 . MacArthur Bl. at Michelson Dr.
ITAM 18 Alt 2 (IRVINE ISEC)
AM PK HOURAM PK HOUR PM PK HOUR
VOL
PM PK HOUR
LANES CAPACITY VOL V/C V/C LANES CAPACITY VOL V/C VOL V/C NBL
NBT
NBR
0 4
d
0 6800
1700
0 1289
370
0 2815
390
NBL
NBT
NBR
1 4
1 1700
6800
1700
331
1403
352
.19 200 .12
.34*
.10
.19
.22
.41*
.23
.21* 2341
.21 169
SBL
SBT
SBR
0 4
0 0
6800
0 0
2970
0 0 SBL
SBT
SBR
2 4
0 3400
6800
0 1199
1902
21 .35*
.28
742
1594
13 .22*
.24.44* 2170
0 .32
EBL
EBT
EBR
0 0
0 0
0 0
0 0
0 0
0 0
EBL
EBT
EBR
2 1
1 3400
1700
1700
699
200
192
.21*
.12
.11
491
173
192
.14*
.10
.11
WBL
WBT
WBR
0 0
1 0
0 1700
0 0
101
0 0
325
WBL
WBT
WBR
2 1
1 3400
1700
1700
120
187
223
.04
.11*
.13
640
171
734
.19*
.10
.43.06 .19
Right Turn Adjustment
Clearance Interval
WBR .19*
.05*
Right Turn Adjustment
Clearance Interval
WBR .02*
.05*.05*
.49
.05*
Note: Assumes E/W Split Phasing
TOTAL CAPACITY UTILIZATION .65 Note: Assumes Right-Turn Overlap for WBR TOTAL CAPACITY UTILIZATION .93 .96
83 . MacArthur Bl. at Douglas Av.
ITAM 18 Alt 2 (IRVINE ISEC)
AM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C
NBL
NBT
NBR
0 4
0 0
6800
0 0
1929
177
0 .31* 1957
81 .30*
SBL
SBT
SBR
2 4
0 3400
6800
0 503
1695
0 .15*
.25
380
2055
0 .11*
.30
EBL
EBT
EBR
0 0
0 0
0 0
0 0
0 0
0 0
WBL
WBT
WBR
1 0
1 1700
0 1700
65 0
231
.04*
.14
79 0
548
.05*
.32
Right Turn Adjustment
Clearance Interval
WBR .19*
.05*.05*
.55TOTAL CAPACITY UTILIZATION
Friday, December 14, 2018
.70 Page 6
City Council
21 –
56 4/16/2024
87 . Dupont Dr. at Michelson Dr.
ITAM 18 Alt 2 (IRVINE ISEC)
AM PK HOUR
97 . Von Karman Av. at Barranca Pkwy.
ITAM 18 Alt 2 (IRVINE ISEC)
AM PK HOURPM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C LANES CAPACITY VOL V/C VOL V/C NBL
NBT
NBR
1 2
0 1700
3400
0 93
35 33
.05*
.02
190
40 70
.11*
.02
.04
NBL
NBT
NBR
2 2
d
3400
3400
1700
94 608
160
.03*
.18
.09
129
1761
428
.04
.52*
.25
SBL
SBT
SBR
1 2
0 1700
3400
0 23
12 25
.01
.01*
.01
179
123
109
.11
.07*
SBL
SBT
SBR
2 2
2 3400
3400
3400
309
1344
760
.09
.40*
.22
280
796
873
.08*
.23
.26
EBL
EBT
EBR
1 2
0 1700
3400
0 68
884
297
.04
.35*
61 601
213
.04
.24*
EBL
EBT
EBR
2 3
d
3400
5100
1700
554
1051
158
.16 542 .16
.35*
.05
.21* 1762
.09 80
WBL
WBT
WBR
1 3
0 1700
5100
0 31
383
108
.02*
.10
45 941
79 .03*
.20
WBL
WBT
WBR
2 4
1 3400
6800
1700
698
1326
188
.21*
.20
.11
454
1268
746
.13*
.19
.44
Clearance Interval .05*
.48
.05*
.50
Right Turn Adjustment
Clearance Interval
WBR .06*
.05*.05*
.90
TOTAL CAPACITY UTILIZATION
TOTAL CAPACITY UTILIZATION 1.19
98 . Von Karman Av. at Alton Pkwy.
ITAM 18 Alt 2 (IRVINE ISEC)
AM PK HOUR
99 . Von Karman Av. at McGaw Av.
ITAM 18 Alt 2 (IRVINE ISEC)
AM PK HOURPM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C LANES CAPACITY VOL V/C VOL V/C NBL
NBT
NBR
1 2
d
1700
3400
1700
148
729
127
.09*
.21
.07
87 1608
220
.05
.47*
.13
NBL
NBT
NBR
1 2
d
1700
3400
1700
97 744
52 .06*
.22
.03
115
1507
180
.07
.44*
.11
SBL
SBT
SBR
1 2
d
1700
3400
1700
83 1522
220
.05
.45*
.13
234
880
249
.14*
.26
.15
SBL
SBT
SBR
1 2
d
1700
3400
1700
59 1572
244
.03
.46*
.14
84 874
119
.05*
.26
.07
EBL
EBT
EBR
1 2
d
1700
3400
1700
182
770
112
.11
.23*
.07
205
928
136
.12*
.27
.08
EBL
EBT
EBR
1 2
0 1700
3400
0 74
409
128
.04*
.16
295
798
97 .17*
.26
WBL
WBT
WBR
1 2
d
1700
3400
1700
186
703
119
.11*
.21
.07
116
815
180
.07
.24*
.11
WBL
WBT
WBR
1 2
0 1700
3400
0 70
489
62 .04
.16*
41 418
111
.02
.16*
Clearance Interval .05*
.93
.05*
1.02 Clearance Interval
TOTAL CAPACITY UTILIZATION
.05*
.77
.05*
.87TOTAL CAPACITY UTILIZATION
Friday, December 14, 2018 Page 7
City Council
21 –
57 4/16/2024
100 . Von Karman Av. at Main St.
ITAM 18 Alt 2 (IRVINE ISEC)
AM PK HOUR
101 . Von Karman Av. at Morse Av.
ITAM 18 Alt 2 (IRVINE ISEC)
AM PK HOURPM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C LANES CAPACITY VOL V/C VOL V/C NBL
NBT
NBR
2 2
1 3400
3400
1700
258
718
216
.08*
.21
.13
463
1196
544
.14
.35*
.32
NBL
NBT
NBR
2 2
0 3400
3400
0 330
1098
113
.10*
.36
107
1763
32 .03
.53*
SBL
SBT
SBR
1 2
1 1700
3400
1700
118
1160
404
.07
.34*
.24
151
719
291
.09*
.21
.17
SBL
SBT
SBR
1 2
f
1700
3400
199
1433
176
.12
.42* 1217
60 44 .03*
.36
EBL
EBT
EBR
2 3
f
3400
5100
237
735
541
.07*
.14
383
1525
305
.11
.30*
EBL
EBT
EBR
1 1
f
1700
1700
28 8
44 .02*
.00
49 4
253
.03*
.00
WBL
WBT
WBR
2 3
0 3400
5100
0 399
847
115
.12
.19* 1056
191
166 .05*
.24
WBL
WBT
WBR
1 1
0 1700
1700
0 23
4 54
.01
.03*
130
13 108
.08
.07*
Clearance Interval
TOTAL CAPACITY UTILIZATION
.05*
.73
.05*
.84
Clearance Interval
TOTAL CAPACITY UTILIZATION
.05*
.62
.05*
.71
102 . Von Karman Av. at Michelson Dr.
ITAM 18 Alt 2 (IRVINE ISEC)
AM PK HOUR
103 . Von Karman Av. at Dupont Dr.
ITAM 18 Alt 2 (IRVINE ISEC)
AM PK HOURPM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C LANES CAPACITY VOL V/C VOL V/C NBL
NBT
NBR
1 2
1 1700
3400
1700
65 1086
153
.04 42 .02
.38*
.09
NBL
NBT
NBR
1 2
0 1700
3400
0 40
1266
52 .02
.39* 1123
158
59 .03
.38*.32* 1306
.09 160
SBL
SBT
SBR
1 2
0 1700
3400
0 457
1216
239
.27*
.43
294
1158
141
.17*
.38
SBL
SBT
SBR
1 2
1 1700
3400
1700
134
1094
32 .08*
.32
.02
151
1455
72 .09*
.43
.04
EBL
EBT
EBR
1 2
0 1700
3400
0 135
270
26 .08*
.09
329
496
98 .19*
.17
EBL
EBT
EBR
1 2
0 1700
3400
0 11
104
87 .01
.06*
38 241
221
.02
.14*
WBL
WBT
WBR
1 2
f
1700
3400
179
506
488
.11
.15*
303
567
665
.18
.17*
WBL
WBT
WBR
1 2
0 1700
3400
0 139
118
153
.08*
.07
.09
84 139
219
.05*
.08
.13
Clearance Interval .05*
.87
.05*
.96
Clearance Interval
TOTAL CAPACITY UTILIZATION
.05*
.66
.05*
.71TOTAL CAPACITY UTILIZATION
Friday, December 14, 2018 Page 8
City Council
21 –
58 4/16/2024
104 . Von Karman Av. at Martin
ITAM 18 Alt 2 (IRVINE ISEC)
112 . Myford Rd. at Michelle Dr.
ITAM 18 Alt 2 (IRVINE ISEC)
AM PK HOURAM PK HOUR PM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C LANES CAPACITY VOL V/C VOL V/C NBL
NBT
NBR
1 2
1 1700
3400
1700
26 1273
13 .02*
.37
.01
32 1074
26 .02*
.32
.02
NBL
NBT
NBR
1 2
0 1700
3400
0 95
0 102
.06*
.03
82 0
406
.05
.12*
SBL
SBT
SBR
1 2
0 1700
3400
0 28
1088
173
.02
.37* 1446
241
29 .02
.50*
SBL
SBT
SBR
1 2
0 1700
3400
0 0
0 0
.00
.00*
0 0
0 .00
.00
EBL
EBT
EBR
2 1
0 3400
1700
0 55
9 36
.02*
.03
151
5 35
.04*
.02
EBL
EBT
EBR
1 2
d
1700
3400
1700
0 128
40 .00
.04*
.02
0 229
88 .00
.07*
.05
WBL
WBT
WBR
1 1
0 1700
1700
0 7
1 12
.00
.01*
23 8
49 .01
.03*
WBL
WBT
WBR
1 2
0 1700
3400
0 370
545
0 .22*
.16
63 110
0 .04*
.03
Clearance Interval .05*
.47
.05*
.64
Clearance Interval .05*
.37
.05*
.28TOTAL CAPACITY UTILIZATION TOTAL CAPACITY UTILIZATION 113 . Myford Rd. at Walnut Av.
ITAM 18 Alt 2 (IRVINE ISEC)
114 . Millikan Av. at Barranca Pkwy.
ITAM 18 Alt 2 (IRVINE ISEC)
AM PK HOURAM PK HOUR PM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C LANES CAPACITY VOL V/C VOL V/C NBL
NBT
NBR
1 1
f
1700
1700
9 19
63 .01
.01*
76 45
391
.04
.03*
NBL
NBT
NBR
1 2
d
1700
3400
1700
139
10 10
.08*
.00
.01
398
97 116
.23*
.03
.07
SBL
SBT
SBR
2 1
1 3400
1700
1700
122
22 67
.04*
.01
.04
256
16 108
.08*
.01
.06
SBL
SBT
SBR
2 0.5
1.5 3400
3400
26 .01 186
74 {.04}*
251 {.04}
.05
24 {.05}*
222
EBL
EBT
EBR
1 2
d
1700
3400
1700
99 586
101
.06
.17*
.06
75 773
26 .04*
.23
.02
EBL
EBT
EBR
2 3
d
3400
5100
1700
154
935
308
.05*
.18
.18
231
1938
237
.07
.38*
.14
WBL
WBT
WBR
2 2
1 3400
3400
1700
307
684
182
.09*
.20
.11
118
966
211
.03
.28*
.12
WBL
WBT
WBR
1 4
1 1700
6800
1700
17 2060
56 .01 39 .02*
.26
.23
.30* 1802
.03 393
Clearance Interval .05*
.36
.05*
.48
Clearance Interval
TOTAL CAPACITY UTILIZATION
.05*
.53
.05*
.72TOTAL CAPACITY UTILIZATION
Friday, December 14, 2018 Page 9
City Council
21 –
59 4/16/2024
115 . Millikan Av. at Alton Pkwy.
ITAM 18 Alt 2 (IRVINE ISEC)
AM PK HOUR
116 . Cartwright Rd. at Main St.
ITAM 18 Alt 2 (IRVINE ISEC)
AM PK HOURPM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C LANES CAPACITY VOL V/C VOL V/C NBL
NBT
NBR
1 1
1 1700
1700
1700
42 7
21 .02*
.00
.01
117
53 111
.07*
.03
.07
NBL
NBT
NBR
1 1
1 1700
1700
1700
33 2
45 .02*
.00
.03
127
11 151
.07*
.01
.09
SBL
SBT
SBR
1 1
1 1700
1700
1700
44 22
113
.03
.01*
.07
93 30
189
.05
.02*
.11
SBL
SBT
SBR
2 1
0 3400
1700
0 116
5 148
.03
.09*
141
3 146
.04
.09*
EBL
EBT
EBR
1 2
d
1700
3400
1700
120
720
110
.07*
.21
.06
168
1135
98 .10
.33*
.06
EBL
EBT
EBR
1 3
0 1700
5100
0 110
912
129
.06*
.20
147
2123
30 .09
.42*
WBL
WBT
WBR
1 2
d
1700
3400
1700
120
965
75 .07
.28*
.04
302
924
98 .18*
.27
.06
WBL
WBT
WBR
2 3
0 3400
5100
0 136
1353
119
.04
.29* 1171
92 98 .03*
.25
Right Turn Adjustment
Clearance Interval
SBR .01*
.05*
Clearance Interval .05*
.51
.05*
.66
.05*
.65
TOTAL CAPACITY UTILIZATION
TOTAL CAPACITY UTILIZATION .44
119 . Teller Av. at Michelson Dr.
ITAM 18 Alt 2 (IRVINE ISEC)
AM PK HOUR
126 . Jamboree Rd. at Bryan Av.
ITAM 18 Alt 2 (IRVINE ISEC)
PM PK HOUR AM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C LANES CAPACITY VOL V/C VOL V/C NBL
NBT
NBR
2 1
0 3400
1700
0 52
16 81
.02
.06*
154
39 340
.05
.22*
NBL
NBT
NBR
2 4
1 3400
6800
1700
90 558
119
.03*
.08
.07
437
2178
333
.13
.32*
.20
SBL
SBT
SBR
1 1
1 1700
1700
1700
300
70 169
.18*
.04
.10
168
77 117
.10*
.05
.07
SBL
SBT
SBR
2 4
d
3400
6800
1700
341
2402
146
.10
.35*
.09
165
945
271
.05*
.14
.16
EBL
EBT
EBR
1 3
1 1700
5100
1700
48 568
160
.03*
.11
.09
78 1192
150
.05
.23*
.09
EBL
EBT
EBR
2 2
d
3400
3400
1700
86 600
203
.03
.18*
.12
267
490
172
.08*
.14
.10
WBL
WBT
WBR
1 3
1 1700
5100
1700
310
1799
26 .18
.35*
.02
63 949
123
.04*
.19
.07
WBL
WBT
WBR
2 2
1 3400
3400
1700
375
644
166
.11*
.19
.10
310
1034
296
.09
.30*
.17
Clearance Interval .05*
.67
.05*
.64
Clearance Interval
TOTAL CAPACITY UTILIZATION
.05*
.72
.05*
.80TOTAL CAPACITY UTILIZATION
Friday, December 14, 2018 Page 10
City Council
21 –
60 4/16/2024
127 . Jamboree Rd. at El Camino Real
ITAM 18 Alt 2 (IRVINE ISEC)
AM PK HOUR
128 . Jamboree Rd. at I-5 NB Ramps
ITAM 18 Alt 2 (IRVINE ISEC)
AM PK HOURPM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C LANES CAPACITY VOL V/C VOL V/C NBL
NBT
NBR
2 4
1 3400
6800
1700
245
647
521
.07*
.10
.31
657
2490
375
.19
.37*
.22
NBL
NBT
NBR
0 4
f
0 6800
0 1055
580
0 2659
570
.16 .39*
SBL
SBT
SBR
1 4
1 1700
6800
1700
234
2633
162
.14
.39*
.10
82 943
293
.05*
.14
.17
SBL
SBT
SBR
0 4
f
0 6800
0 2933
479
0 .43* 1577
300
.23
EBL
EBT
EBR
1 1
2 1700
1700
3400
71 204
269
.04
.12*
.08
277
196
397
.16*
.12
.12
EBL
EBT
EBR
0 0
0 0
0 0
0 0
0 0
0 0
WBL
WBT
WBR
2 2
0 3400
3400
0 359
153
62 .11*
.06
498
346
216
.15
.17*
WBL
WBT
WBR
1.5 0
1.5 1297
1 395
.38*
.23
453
0 991
.27*
.29
5100
Clearance Interval .05* .05*
.80
Right Turn Adjustment
Clearance Interval
WBR .02*
.05*Note: Assumes Right-Turn Overlap for EBR .05*
.86TOTAL CAPACITY UTILIZATION .74 TOTAL CAPACITY UTILIZATION .73 129 . Jamboree Rd. at I-5 SB Ramps
ITAM 18 Alt 2 (IRVINE ISEC)
AM PK HOUR
130 . Jamboree Rd. at Michelle Dr.
ITAM 18 Alt 2 (IRVINE ISEC)
AM PK HOURPM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C LANES CAPACITY VOL V/C VOL V/C NBL
NBT
NBR
0 4
f
0 6800
0 1177
401
0 2748
1420
NBL
NBT
NBR
1 4
d
1700
6800
1700
177
1401
60 .10*
.21
.04
101
3504
7 .06
.52*
.00
.17 .40*
SBL
SBT
SBR
0 4
f
0 6800
0 3349
852
0 SBL
SBT
SBR
1 4
d
1700
6800
1700
37 3414
658
.02 26 .02*
.33
.15
.49* 1650
440
.24 .50* 2272
.39 254
EBL
EBT
EBR
2 0
2 3400
0 3400
427
0 733
.13*
.22
472
0 850
.14*
.25
EBL
EBT
EBR
2 0.5
1.5 3400
3400
181
3 80
.05*
.00
563
17 {.01}
195
.17*
WBL
WBT
WBR
0 0
0 0
0 0
0 0
0 0
0 0
WBL
WBT
WBR
1 1
0 1700
1700
0 6
5 8
.00
.01*
26 .02
.04*5
59 Right Turn Adjustment
Clearance Interval
EBR .09*
.05*
Clearance Interval
TOTAL CAPACITY UTILIZATION
.05*
.71
.05*
.80
.05*
.59TOTAL CAPACITY UTILIZATION
Friday, December 14, 2018
.76
City Council
21 –
61 4/16/2024
131 . Jamboree Rd. SB at Walnut Av.
ITAM 18 Alt 2 (IRVINE ISEC)
AM PK HOUR
132 . Jamboree Rd. NB at Walnut Av.
ITAM 18 Alt 2 (IRVINE ISEC)
AM PK HOURPM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C LANES CAPACITY VOL V/C VOL V/C NBL
NBT
NBR
0 0
0 0
0 0
0 0
0 0
0 0
NBL
NBT
NBR
2 2
d
3400
3400
1700
333
452
396
.10
.13*
.23
449
865
561
.13
.25*
.33
SBL
SBT
SBR
2 2
1 3400
3400
1700
303
884
534
.09
.26*
.31
297
556
209
.09
.16*
.12
SBL
SBT
SBR
0 0
0 0
0 0
0 0
0 0
0 0
EBL
EBT
EBR
0 3
1 0
5100
1700
0 465
364
0 813
600
EBL
EBT
EBR
2 3
0 3400
5100
0 50
724
0 .01*
.14
343
769
0 .10*
.15.09*
.21
.16*
.35
WBL
WBT
WBR
2 3
0 3400
5100
0 360
720
0 .11*
.14
374
1201
0 .11*
.24
WBL
WBT
WBR
0 3
1 0
5100
1700
0 747
337
0 .15* 1131 .22*
.23.20 392
Right Turn Adjustment
Clearance Interval
EBR .12*
.05*
EBR .19*
.05*
Right Turn Adjustment Multi
Clearance Interval
.13*
.05*
WBR .01*
.05*
TOTAL CAPACITY UTILIZATION .63 .67 TOTAL CAPACITY UTILIZATION .47 .63 134 . Loop Rd. at Warner Av.
ITAM 18 Alt 2 (IRVINE ISEC)
135 . Jamboree Rd. NB at Warner Av.
ITAM 18 Alt 2 (IRVINE ISEC)
AM PK HOURAM PK HOUR PM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C LANES CAPACITY VOL V/C VOL V/C NBL
NBT
NBR
1 2
1 1700
3400
1700
59 36
196
.03
.01*
.12
172
56 622
.10*
.02
.37
NBL
NBT
NBR
0 1
0 0
1700
0 0
0 0
0 0
0 .00 .00
SBL
SBT
SBR
1 2
f
1700
3400
256
210
507
.15*
.06
229
263
148
.13
.08*
SBL
SBT
SBR
0 1
1 0
1700
1700
7 0
85 8
0 167
.00*
.05
.00*
.10
EBL
EBT
EBR
2 3
1 3400
5100
1700
23 878
183
.01 53 .02*
.21
.09
EBL
EBT
EBR
1 2
d
1700
3400
1700
382
643
1 .22*
.19
.00
915
892
3 .54*
.26
.00
.17* 1088
.11 158
WBL
WBT
WBR
2 2
1 3400
3400
1700
157
464
31 .05*
.14
.02
289
961
61 .09
.28*
.04
WBL
WBT
WBR
1 2
d
1700
3400
1700
1 595
138
.00 2 .00
.31*
.11
.18* 1043
.08 195
Right Turn Adjustment
Clearance Interval
NBR .07*
.05*
NBR .25*
.05*
Clearance Interval .05*
.45
.05*
.90TOTAL CAPACITY UTILIZATION
TOTAL CAPACITY UTILIZATION
Friday, December 14, 2018
.50 .78
City Council
21 –
62 4/16/2024
136 . Jamboree Rd. at Barranca Pkwy.
ITAM 18 Alt 2 (IRVINE ISEC)
AM PK HOUR
137 . Jamboree Rd. at Beckman Av.
ITAM 18 Alt 2 (IRVINE ISEC)
AM PK HOURPM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C LANES CAPACITY VOL V/C VOL V/C NBL
NBT
NBR
2 4
f
3400
6800
207
968
144
.06*
.14
563
3320
100
.17
.49*
NBL
NBT
NBR
1 4
0 1700
6800
0 25
1253
78 .01*
.20
28 3506
30 .02
.52*
SBL
SBT
SBR
2 4
f
3400
6800
579
3999
1393
.17
.59* 1823
589
352 .10*
.27
SBL
SBT
SBR
1 4
0 1700
6800
0 71
3225
197
.04
.50* 1786
88 11 .01*
.28
EBL
EBT
EBR
2.5 2.5
1 210
649
181
.06 1100 EBL
EBT
EBR
1 1
d
1700
1700
1700
39 11
21 .02*
.01
178
39 .10*
.028500
1700
.13* 1089 .26*
.16.11
.06
.11* 1078
660
264 .01 93 .05
WBL
WBT
WBR
2 3
f
3400
5100
194
583
143
143 .04
.21*
WBL
WBT
WBR
1 1
0 1700
1700
0 55
38 38
.03
.04*
77 24
119
.05
.08*
Clearance Interval .05* .05*
1.11 Clearance Interval .05*
.62
.05*
.76
Note: Assumes E/W Split Phasing
TOTAL CAPACITY UTILIZATION
TOTAL CAPACITY UTILIZATION .94
138 . Jamboree Rd. at Alton Pkwy.
ITAM 18 Alt 2 (IRVINE ISEC)
AM PK HOUR
139 . Jamboree Rd. at McGaw Av.
ITAM 18 Alt 2 (IRVINE ISEC)
PM PK HOUR AM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C LANES CAPACITY VOL V/C VOL V/C NBL
NBT
NBR
2 4
1 3400
6800
1700
212
1115
258
.06*
.16
.15
287
3166
174
.08
.47*
.10
NBL
NBT
NBR
2 4
0 3400
6800
0 202
1452
54 .06*
.22
245
3247
33 .07
.48*
SBL
SBT
SBR
2 4
0 3400
6800
0 304
2942
206
.09
.46* 1523
260
267 .08*
.26
SBL
SBT
SBR
2 4
0 3400
6800
0 18
3092
274
.01
.50* 1917
112
24 .01*
.30
EBL
EBT
EBR
2 3
0 3400
5100
0 151
498
187
.04
.13*
470
809
252
.14*
.21
EBL
EBT
EBR
1 2
0 1700
3400
0 120
101
140
.07*
.06
.08
309
374
299
.18
.20*
WBL
WBT
WBR
2 3
d
3400
5100
1700
221
652
154
.07*
.13
.09
265
793
233
.08
.16*
.14
WBL
WBT
WBR
1 2
0 1700
3400
0 24
90 16
.01
.03*
57 63
50 .03*
.03
Clearance Interval .05*
.77
.05*
.90
Clearance Interval
TOTAL CAPACITY UTILIZATION
.05*
.71
.05*
.77TOTAL CAPACITY UTILIZATION
Friday, December 14, 2018 Page 13
City Council
21 –
63 4/16/2024
140 . Jamboree Rd. at Kelvin Av.
ITAM 18 Alt 2 (IRVINE ISEC)
AM PK HOUR
141 . Jamboree Rd. at Main St.
ITAM 18 Alt 2 (IRVINE ISEC)
PM PK HOUR AM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C LANES CAPACITY VOL V/C VOL V/C NBL
NBT
NBR
1 4
0 1700
6800
0 75
1595
152
.04*
.26
162
3316
316
.10
.53*
NBL
NBT
NBR
2 4
f
3400
6800
418
1496
489
.12*
.22
404
2831
617
.12
.42*
SBL
SBT
SBR
1 4
d
1700
6800
1700
18 3115
5 .01 13 .01*
.34
.03
SBL
SBT
SBR
2 4
1 3400
6800
1700
453
2577
348
.13 286 .08*
.28
.15
.46* 2285 .38* 1936
.00 49 .20 247
EBL
EBT
EBR
1 1
d
1700
1700
1700
47 20
174
.03
.01*
.10
20 32
138
.01
.02*
.08
EBL
EBT
EBR
2 3
f
3400
5100
142
470
368
.04
.09* 1199
663
678 .20
.24*
WBL
WBT
WBR
1 1
d
1700
1700
1700
132
21 18
.08*
.01
.01
186
29 14
.11*
.02
.01
WBL
WBT
WBR
2 3
f
3400
5100
545
757
167
.16*
.15
504
680
405
.15*
.13
Right Turn Adjustment
Clearance Interval
EBR .06*
.05*
Clearance Interval .05* .05*
.94
.05*
.72
Note: Assumes Right-Turn Overlap for SBR
TOTAL CAPACITY UTILIZATION .70 TOTAL CAPACITY UTILIZATION .80 142 . Jamboree Rd. at Union
ITAM 18 Alt 2 (IRVINE ISEC)
143 . Jamboree Rd. at I-405 NB Ramps
ITAM 18 Alt 2 (IRVINE ISEC)
AM PK HOURAM PK HOUR PM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C LANES CAPACITY VOL V/C VOL V/C NBL
NBT
NBR
0 4
1 0
6800
1700
0 2570
470
0 3750
120
NBL
NBT
NBR
0 3
f
0 5100
0 2169
640
0 .38
.28
.55*
.07
.43* 3398
630
.67*
SBL
SBT
SBR
0 4
0 0
6800
0 0
3000
0 0 SBL
SBT
SBR
0 4
f
0 6800
0 2138
1390
0 2269
970
.44* 3690
0 .54 .31 .33
EBL
EBT
EBR
0 0
0 0
0 0
0 0
0 0
0 0
EBL
EBT
EBR
0 0
0 0
0 0
0 0
0 0
0 0
WBL
WBT
WBR
0 0
0 0
0 0
0 0
0 0
0 0
WBL
WBT
WBR
3 0
f
5100
0 1782
0 881
.35* 1221 .24*
0 622
Clearance Interval .05*
.49
.05*
.60
Clearance Interval
TOTAL CAPACITY UTILIZATION
.05*
.83
.05*
.96TOTAL CAPACITY UTILIZATION
Friday, December 14, 2018 Page 14
City Council
21 –
64 4/16/2024
144 . Jamboree Rd. at I-405 SB Ramps
ITAM 18 Alt 2 (IRVINE ISEC)
AM PK HOUR
145 . Jamboree Rd. at Michelson Dr.
ITAM 18 Alt 2 (IRVINE ISEC)
AM PK HOURPM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C LANES CAPACITY VOL V/C VOL V/C NBL
NBT
NBR
0 3
f
0 5100
0 1911
810
0 2931
1562
NBL
NBT
NBR
1 4
1 1700
6800
1700
218
1576
436
.13 132 .08
.35*
.22
.37 .57* .23* 2403
.26 373
SBL
SBT
SBR
0 4
f
0 6800
0 3514
365
0 SBL
SBT
SBR
2 4
f
3400
6800
1271
2392
1337
.37*
.35
891
2165
526
.26*
.32.52* 2816
701
.41
EBL
EBT
EBR
2 0
2 3400
0 3400
1017
0 1673
.30* 1073
0 .32*
.31
EBL
EBT
EBR
2 2
1 3400
3400
1700
392
424
103
.12*
.12
.06
772
728
111
.23*
.21
.07.49 1038
WBL
WBT
WBR
0 0
0 0
0 0
0 0
0 0
0 0
WBL
WBT
WBR
2 2
f
3400
3400
317
476
765
.09
.14*
497
453
1369
.15
.13*
Right Turn Adjustment
Clearance Interval
EBR .19*
.05*
Clearance Interval
TOTAL CAPACITY UTILIZATION
.05*
.91
.05*
1.02 .05*
.94TOTAL CAPACITY UTILIZATION 1.06
146 . Jamboree Rd. at Dupont Rd.
ITAM 18 Alt 2 (IRVINE ISEC)
AM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C
NBL
NBT
NBR
1 4
1 1700
6800
1700
126
1743
14 .07*
.26
.01
82 2339
35 .05*
.34
.02
SBL
SBT
SBR
1 3
d
1700
5100
1700
66 2027
248
.04 161 .09
.45*
.08
.40* 2291
.15 132
EBL
EBT
EBR
2 1
0 3400
1700
0 127
70 107
.04
.10*
199
94 208
.06
.18*
WBL
WBT
WBR
1 2
0 1700
3400
0 26
46 180
.02*
.03
.11
21 46
113
.01*
.03
.07
Clearance Interval .05*
.64
.05*
.74TOTAL CAPACITY UTILIZATION
Friday, December 14, 2018 Page 15
City Council
21 –
65 4/16/2024
164 . Construction S. at Barranca Pkwy.
ITAM 18 Alt 2 (IRVINE ISEC)
AM PK HOUR
168 . Murphy Av. at Alton Pkwy.
ITAM 18 Alt 2 (IRVINE ISEC)
PM PK HOUR AM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C LANES CAPACITY VOL V/C VOL V/C NBL
NBT
NBR
1 1
0 1700
1700
0 30
24 27
.02*
.03
333
108
178
.20*
.17
NBL
NBT
NBR
1 1
0 1700
1700
0 30
20 112
.02
.08*
82 202
406
.05
.36*
SBL
SBT
SBR
1 1
1 1700
1700
1700
54 62
113
.03
.04*
.07
56 48
265
.03
.03*
.16
SBL
SBT
SBR
1 1
0 1700
1700
0 40
27 23
.02*
.03
62 49
118
.04*
.10
EBL
EBT
EBR
1 3
1 1700
5100
1700
243
880
205
.14*
.17
.12
142
1269
34 .08*
.25
.02
EBL
EBT
EBR
1 3
d
1700
5100
1700
123
848
69 .07*
.17
.04
54 1165
33 .03
.23*
.02
WBL
WBT
WBR
1 3
d
1700
5100
1700
153
727
83 .09 58 .03
.25*
.04
WBL
WBT
WBR
1 3
d
1700
5100
1700
94 947
68 .06 109 .06*
.22
.03
.14* 1277 .19* 1113
.05 71 .04 45
Right Turn Adjustment
Clearance Interval
SBR .07*
.05*
Clearance Interval .05*
.41
.05*
.74
.05*
.39
TOTAL CAPACITY UTILIZATION
TOTAL CAPACITY UTILIZATION .68
170 . Union at Main St. 171 . Veneto at Main St.
ITAM 18 Alt 2 (IRVINE ISEC) ITAM 18 Alt 2 (IRVINE ISEC)
AM PK HOUR PM PK HOUR AM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C LANES CAPACITY VOL V/C VOL V/C NBL
NBT
NBR
2 1
0 3400
1700
0 141
3 36
.04
.02*
722
12 87
.21*
.06
NBL
NBT
NBR
2 1
0 3400
1700
0 209
8 36
.06*
.03
207
21 193
.06
.13*
SBL
SBT
SBR
1 1
1 1700
1700
1700
61 5
43 .04*
.00
.03
44 2
84 .03
.00*
.05
SBL
SBT
SBR
1 1
0 1700
1700
0 41
11 80
.02
.05*
23 6
50 .01*
.03
EBL
EBT
EBR
2 3
f
3400
5100
97 843
374
.03*
.17
165
1970
102
.05
.39*
EBL
EBT
EBR
1 3
0 1700
5100
0 29
573
102
.02*
.13
84 1891
87 .05
.39*
WBL
WBT
WBR
2 3
0 3400
5100
0 56
1210
21 .02
.24*
26 713
42 .01*
.15
WBL
WBT
WBR
2 3
0 3400
5100
0 57
1011
23 .02
.20*
57 526
35 .02*
.11
Clearance Interval .05*
.38
.05*
.66
Clearance Interval
TOTAL CAPACITY UTILIZATION
.05*
.38
.05*
.60TOTAL CAPACITY UTILIZATION
Friday, December 14, 2018 Page 16
City Council
21 –
66 4/16/2024
174 . Carlson Av. at Michelson Dr.
ITAM 18 Alt 2 (IRVINE ISEC)
AM PK HOUR
175 . Carlson Av. at Campus Dr.
ITAM 18 Alt 2 (IRVINE ISEC)
PM PK HOUR AM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C LANES CAPACITY VOL V/C VOL V/C NBL
NBT
NBR
2 2
1 3400
3400
1700
326
240
334
.10*
.07
.20
215
175
329
.06*
.05
.19
NBL
NBT
NBR
0 0
0 0
0 0
0 0
0 0
0 0
SBL
SBT
SBR
2 1
f
3400
1700
71 48
341
.02
.03*
146
275
1269
.04
.16*
SBL
SBT
SBR
1 0
1 1700
0 1700
292
0 259
.17*
.15
328
0 292
.19*
.17
EBL
EBT
EBR
2 2
1 3400
3400
1700
1065
867
118
.31*
.26
.07
737
855
288
.22*
.25
.17
EBL
EBT
EBR
1 2
0 1700
3400
0 297
848
0 .17*
.25
428
1332
0 .25*
.39
WBL
WBT
WBR
1 2
f
1700
3400
155
626
178
.09
.18* 1185
247
428 .25
.35*
WBL
WBT
WBR
0 2
d
0 3400
1700
0 1101
173
0 .32* 1098 .32*
.18.10 302
Clearance Interval .05*
.67
.05*
.84
Clearance Interval
TOTAL CAPACITY UTILIZATION
.05*
.71
.05*
.81TOTAL CAPACITY UTILIZATION
180 . Harvard Av. at Walnut Av.
ITAM 18 Alt 2 (IRVINE ISEC)
181 . Harvard Av. at Edinger Av.
ITAM 18 Alt 2 (IRVINE ISEC)
AM PK HOURAM PK HOUR PM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C LANES CAPACITY VOL V/C VOL V/C NBL
NBT
NBR
2 1
d
3400
1700
1700
206
61 144
.06
.04*
.08
347
58 295
.10*
.03
.17
NBL
NBT
NBR
2 2
1 3400
3400
1700
174
223
145
.05
.07*
.09
278
580
254
.08
.17*
.15
SBL
SBT
SBR
1 1
1 1700
1700
1700
149
91 111
.09*
.05
.07
99 58
73 .06
.03*
.04
SBL
SBT
SBR
1 2
d
1700
3400
1700
191
306
147
.11*
.09
.09
118
243
109
.07*
.07
.06
EBL
EBT
EBR
1 2
1 1700
3400
1700
38 556
261
.02*
.16
.15
103
856
340
.06
.25*
.20
EBL
EBT
EBR
2 3
1 3400
5100
1700
74 1354
150
.02 144 .04*
.22
.11
.27* 1147
.09 180
WBL
WBT
WBR
1 2
d
1700
3400
1700
108
803
91 .06
.24*
.05
202
910
28 .12*
.27
.02
WBL
WBT
WBR
2 3
0 3400
5100
0 124
1090
83 .04*
.23
126
1883
136
.04
.40*
Right Turn Adjustment
Clearance Interval
NBR .01*
.05*
Clearance Interval
TOTAL CAPACITY UTILIZATION
.05*
.54
.05*
.73
.05*
.44TOTAL CAPACITY UTILIZATION .56
Friday, December 14, 2018 Page 17
City Council
21 –
67 4/16/2024
182 . Harvard Av. at Paseo Westpark
ITAM 18 Alt 2 (IRVINE ISEC)
AM PK HOUR
183 . Harvard Av. at Warner Av.
ITAM 18 Alt 2 (IRVINE ISEC)
PM PK HOUR AM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C LANES CAPACITY VOL V/C VOL V/C NBL
NBT
NBR
1 2
d
1700
3400
1700
91 264
75 .05*
.08
.04
110
761
178
.06
.22*
.10
NBL
NBT
NBR
1 2
d
1700
3400
1700
105
298
57 .06*
.09
.03
277
989
96 .16
.29*
.06
SBL
SBT
SBR
1 2
1 1700
3400
1700
116
361
112
.07
.11*
.07
69 362
110
.04*
.11
.06
SBL
SBT
SBR
1 2
d
1700
3400
1700
245
656
128
.14
.19*
.08
135
426
118
.08*
.13
.07
EBL
EBT
EBR
1 1
d
1700
1700
1700
66 209
125
.04
.12*
.07
163
173
83 .10*
.10
.05
EBL
EBT
EBR
1 2
d
1700
3400
1700
133
367
220
.08*
.11
.13
195
539
86 .11*
.16
.05
WBL
WBT
WBR
1 1
d
1700
1700
1700
154
166
210
.09*
.10
.12
115
170
186
.07
.10*
.11
WBL
WBT
WBR
1 2
d
1700
3400
1700
84 448
159
.05
.13*
.09
68 696
186
.04
.20*
.11
Clearance Interval .05*
.42
.05*
.51
Clearance Interval .05*
.51
.05*
.73TOTAL CAPACITY UTILIZATION TOTAL CAPACITY UTILIZATION 184 . Harvard Av. at Barranca Pkwy.
ITAM 18 Alt 2 (IRVINE ISEC)
AM PK HOUR
185 . Harvard Av. at Alton Pkwy.
ITAM 18 Alt 2 (IRVINE ISEC)
AM PK HOURPM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C LANES CAPACITY VOL V/C VOL V/C NBL
NBT
NBR
1 2
1 1700
3400
1700
149
321
91 .09*
.09
.05
265
1100
226
.16
.32*
.13
NBL
NBT
NBR
1 2
d
1700
3400
1700
262
422
126
.15*
.12
.07
293
1233
146
.17
.36*
.09
SBL
SBT
SBR
1 2
1 1700
3400
1700
250
785
119
.15
.23*
.07
132
388
89 .08*
.11
.05
SBL
SBT
SBR
1 2
1 1700
3400
1700
36 1042
162
.02
.31*
.10
56 533
123
.03*
.16
.07
EBL
EBT
EBR
2 3
1 3400
5100
1700
57 699
226
.02*
.14
.13
161
1032
225
.05*
.20
.13
EBL
EBT
EBR
2 3
1 3400
5100
1700
76 538
367
.02*
.11
.22
265
1039
407
.08*
.20
.24
WBL
WBT
WBR
2 3
0 3400
5100
0 189
822
102
.06
.18* 1056
179
136 .04
.24*
WBL
WBT
WBR
2 3
0 3400
5100
0 191
787
22 .06
.16*
140
803
52 .04
.17*
Clearance Interval .05*
.57
.05*
.74
Clearance Interval
TOTAL CAPACITY UTILIZATION
.05*
.69
.05*
.69TOTAL CAPACITY UTILIZATION
Friday, December 14, 2018 Page 18
City Council
21 –
68 4/16/2024
186 . Harvard Av. at Main St.
ITAM 18 Alt 2 (IRVINE ISEC)
187 . Harvard Av. at Coronado
ITAM 18 Alt 2 (IRVINE ISEC)
AM PK HOUR PM PK HOUR AM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C LANES CAPACITY VOL V/C VOL V/C NBL
NBT
NBR
2 2
1 3400
3400
1700
110
413
116
.03*
.12
.07
192
1277
330
.06
.38*
.19
NBL
NBT
NBR
2 2
0 3400
3400
0 150
434
13 .04*
.13
226
1633
44 .07
.49*
SBL
SBT
SBR
2 2
1 3400
3400
1700
55 1297
389
.02
.38*
.23
26 776
169
.01*
.23
.10
SBL
SBT
SBR
1 2
d
1700
3400
1700
50 1592
154
.03 118 .07*
.29
.03
.47* 1002
.09 55
EBL
EBT
EBR
2 3
0 3400
5100
0 184
229
155
.05 647 .19
.32*
EBL
EBT
EBR
2 1
d
3400
1700
1700
72 6
155
.02*
.00
.09
80 9
252
.02*
.01
.15
.07* 1358
.09 263
WBL
WBT
WBR
2 3
0 3400
5100
0 378
581
22 .11*
.12
132
290
29 .04*
.06
WBL
WBT
WBR
1 1
1 1700
1700
1700
43 16
114
.03
.01*
.07
17 11
42 .01
.01*
.02
Clearance Interval
TOTAL CAPACITY UTILIZATION
.05*
.64
.05*
.80
Right Turn Adjustment
Clearance Interval
EBR .06*
.05* .05*
.64TOTAL CAPACITY UTILIZATION .65
188 . Harvard Av. at Michelson Dr.
ITAM 18 Alt 2 (IRVINE ISEC)
AM PK HOUR
189 . Harvard Av. at University Dr.
ITAM 18 Alt 2 (IRVINE ISEC)
AM PK HOURPM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C LANES CAPACITY VOL V/C VOL V/C NBL
NBT
NBR
1 2
0 1700
3400
0 130
362
48 .08*
.12
89 1024
96 .05
.33*
NBL
NBT
NBR
1 2
d
1700
3400
1700
79 337
107
.05*
.10
.06
84 757
290
.05
.22*
.17
SBL
SBT
SBR
1 2
1 1700
3400
1700
184
985
621
.11
.29*
.37
321
650
270
.19*
.19
.16
SBL
SBT
SBR
1 2
d
1700
3400
1700
30 677
468
.02
.20*
.28
103
590
246
.06*
.17
.14
EBL
EBT
EBR
2 2
f
3400
3400
100
318
62 .03*
.09
662
933
194
.19*
.27
EBL
EBT
EBR
1 3
0 1700
5100
0 114
1115
53 .07*
.23
419
1827
76 .25*
.37
WBL
WBT
WBR
1 2
d
1700
3400
1700
103
829
137
.06
.24*
.08
96 511
213
.06
.15*
.13
WBL
WBT
WBR
1 3
0 1700
5100
0 151
2158
80 .09
.44* 1360
54 174 .10
.28*
Right Turn Adjustment
Clearance Interval
SBR .06*
.05*
Right Turn Adjustment
Clearance Interval
SBR .03*
.05*.05*
.91
.05*
.86TOTAL CAPACITY UTILIZATION
Friday, December 14, 2018
.75 TOTAL CAPACITY UTILIZATION .84
City Council
21 –
69 4/16/2024
190 . University Dr. at Campus Dr.
ITAM 18 Alt 2 (IRVINE ISEC)
AM PK HOUR
191 . Mesa Rd. at University Dr.
ITAM 18 Alt 2 (IRVINE ISEC)
AM PK HOURPM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C LANES CAPACITY VOL V/C
.00
.03
VOL V/C
NBL
NBT
NBR
2 3
1 3400
5100
1700
107
1082
402
.03*
.21
.24
258
1575
273
.08
.31*
.16
NBL
NBT
NBR
1 0
1 1700
0 1700
7 0
44 103
0 .06*
.13219
SBL
SBT
SBR
1 3
1 1700
5100
1700
155
1989
614
.09 80 .05*
.27
.16
SBL
SBT
SBR
0 0
0 0
0 0
0 0
0 0
0 0
.39* 1367
.36 279
EBL
EBT
EBR
2 2
d
3400
3400
1700
164
753
363
.05
.22*
.21
525
898
165
.15*
.26
.10
EBL
EBT
EBR
0 3
1 0
5100
1700
0 1576
109
0 .31* 2011 .39*
.04.06 63
WBL
WBT
WBR
2 2
d
3400
3400
1700
177
609
43 .05*
.18
.03
318
874
200
.09
.26*
.12
WBL
WBT
WBR
1 3
0 1700
5100
0 231
2263
0 .14*
.44
127
1687
0 .07*
.33
Clearance Interval
TOTAL CAPACITY UTILIZATION
.05*
.74
.05*
.82
Right Turn Adjustment
Clearance Interval
NBR .02*
.05*.05*
.50TOTAL CAPACITY UTILIZATION .59
192 . California Av. at University Dr.
ITAM 18 Alt 2 (IRVINE ISEC)
AM PK HOUR
193 . MacArthur Blvd. NB at University Dr.
ITAM 18 Alt 2 (IRVINE ISEC)
PM PK HOUR AM PK HOUR PM PK HOUR
VOLLANES CAPACITY VOL V/C VOL V/C LANES CAPACITY VOL V/C V/C NBL
NBT
NBR
2 0
1 3400
0 1700
228
0 222
.07*
.13
765
0 855
.23*
.50
NBL
NBT
NBR
1 0
1 1700
0 1700
33 0
331
.02*
.19
10 0
269
.01*
.16
SBL
SBT
SBR
0 0
0 0
0 0
0 0
0 0
0 0
SBL
SBT
SBR
0 0
0 0
0 0
0 0
0 0
0 0
EBL
EBT
EBR
0 3
1 0
5100
1700
0 1411
1071
0 EBL
EBT
EBR
0 3
d
0 5100
1700
0 2159
150
0 .28* 1215 .24
.35
.42* 1551 .30*
.07.63 588 .09 112
WBL
WBT
WBR
2 3
0 3400
5100
0 923
1315
0 .27*
.26
132
1655
0 .04
.32*
WBL
WBT
WBR
2 3
0 3400
5100
0 580
937
0 .17* 1418 .42*
.19.18 950
0 Right Turn Adjustment
Clearance Interval
EBR .30*
.05*
NBR .21*
.05*
Right Turn Adjustment
Clearance Interval
NBR .04*
.05* .05*
.78TOTAL CAPACITY UTILIZATION
Friday, December 14, 2018
.97 .81 TOTAL CAPACITY UTILIZATION .70
City Council
21 –
70 4/16/2024
196 . Hearthstone Bl. at ICD
ITAM 18 Alt 2 (IRVINE ISEC)
AM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C
NBL
NBT
NBR
1 1
1 1700
1700
1700
24 23
483
.01*
.01
.28
37 46
364
.02*
.03
.21
SBL
SBT
SBR
1 1
d
1700
1700
1700
38 50
60 .02
.03*
.04
25 40
45 .01
.02*
.03
EBL
EBT
EBR
1 3
0 1700
5100
0 17
1724
77 .01
.35* 1440
91 48 .03
.30*
WBL
WBT
WBR
1 3
0 1700
5100
0 255
1219
21 .15*
.24
439
2018
56 .26*
.41
Right Turn Adjustment
Clearance Interval
NBR .15*
.05* .05*
.65TOTAL CAPACITY UTILIZATION .74
Friday, December 14, 2018 Page 21
City Council
21 –
71 4/16/2024
198 . Paseo Westpark at Warner Av.
ITAM 18 Alt 2 (IRVINE ISEC)
AM PK HOUR
199 . Paseo Westpark at Barranca Pkwy.
ITAM 18 Alt 2 (IRVINE ISEC)
AM PK HOURPM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C LANES CAPACITY VOL V/C VOL V/C NBL
NBT
NBR
1 1
d
1700
1700
1700
109
154
26 .06*
.09
.02
152
170
48 .09*
.10
.03
NBL
NBT
NBR
2 1
1 3400
1700
1700
74 143
145
.02*
.08
.09
185
347
258
.05
.20*
.15
SBL
SBT
SBR
1 1
d
1700
1700
1700
82 260
50 .05
.15*
.03
49 83
58 .03
.05*
.03
SBL
SBT
SBR
2 1
d
3400
1700
1700
159
234
90 .05
.14*
.05
86 125
49 .03*
.07
.03
EBL
EBT
EBR
1 2
d
1700
3400
1700
90 512
113
.05*
.15
.07
100
563
128
.06*
.17
.08
EBL
EBT
EBR
1 3
1 1700
5100
1700
37 876
107
.02 115 .07
.24*
.08
.17* 1246
.06 130
WBL
WBT
WBR
1 2
d
1700
3400
1700
45 461
121
.03
.14*
.07
49 660
101
.03
.19*
.06
WBL
WBT
WBR
1 3
0 1700
5100
0 150
966
100
.09*
.21
145
1096
148
.09*
.24
Clearance Interval .05*
.45
.05*
.44
Clearance Interval .05*
.47
.05*
.61TOTAL CAPACITY UTILIZATION TOTAL CAPACITY UTILIZATION 200 . Paseo Westpark at Alton Pkwy.
ITAM 18 Alt 2 (IRVINE ISEC)
AM PK HOUR
201 . Paseo Westpark at Main St.
ITAM 18 Alt 2 (IRVINE ISEC)
AM PK HOURPM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C LANES CAPACITY VOL V/C VOL V/C NBL
NBT
NBR
1 1
0 1700
1700
0 32
233
77 .02
.18*
38 422
99 .02
.31*
NBL
NBT
NBR
1 1
0 1700
1700
0 131
282
78 .08
.21*
61 201
31 .04
.14*
SBL
SBT
SBR
1 1
1 1700
1700
1700
139
290
103
.08*
.17
.06
91 187
112
.05*
.11
.07
SBL
SBT
SBR
1 1
1 1700
1700
1700
154
253
132
.09*
.15
.08
78 141
75 .05*
.08
.04
EBL
EBT
EBR
1 3
0 1700
5100
0 57
634
25 .03*
.13
109
1039
49 .06
.21*
EBL
EBT
EBR
1 2
d
1700
3400
1700
36 285
129
.02*
.08
.08
319
1171
128
.19
.34*
.08
WBL
WBT
WBR
1 3
d
1700
5100
1700
85 805
90 .05
.16*
.05
103
771
149
.06*
.15
.09
WBL
WBT
WBR
1 2
d
1700
3400
1700
44 680
67 .03
.20*
.04
21 294
90 .01*
.09
.05
Clearance Interval .05*
.50
.05*
.68
Clearance Interval .05*
.57
.05*
.59TOTAL CAPACITY UTILIZATION TOTAL CAPACITY UTILIZATION Friday, December 14, 2018 Page 22
City Council
21 –
72 4/16/2024
221 . Culver Dr. at Bryan Av.
ITAM 18 Alt 2 (IRVINE ISEC)
222 . Culver Dr. at Trabuco Rd.
ITAM 18 Alt 2 (IRVINE ISEC)
AM PK HOUR PM PK HOUR AM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C LANES CAPACITY VOL V/C
.13
.20
VOL V/C
NBL
NBT
NBR
2 3
1 3400
5100
1700
270
588
244
.08*
.12
.14
689
1639
363
.20*
.32
.21
NBL
NBT
NBR
0 3
f
0 5100
0 657
973
0 2033
1190
.40*
SBL
SBT
SBR
2 3
d
3400
5100
1700
141
1892
342
.04
.37*
.20
78 698
103
.02
.14*
.06
SBL
SBT
SBR
1 3
f
1700
5100
339
2684
652
163 .10*
.25.53* 1284
175
EBL
EBT
EBR
2 1.5
1.5 3400
5100
252
345 {.14}*
475
.07 253
579 {.17}
457 {.12}
.07* EBL
EBT
EBR
0 0
0 0
0 0
0 0
0 0
0 0
WBL
WBT
WBR
2 2
0 3400
3400
0 494
538
121
.15*
.19
214
758
108
.06
.25*
WBL
WBT
WBR
2 0
2 3400
0 3400
879
0 480
.26*
.14
765
0 824
.23*
.24
Clearance Interval .05* .05*
.71
Clearance Interval .05*
.84
.05*
.78
Note: Assumes Right-Turn Overlap for NBR
TOTAL CAPACITY UTILIZATION
TOTAL CAPACITY UTILIZATION .79
223 . Culver Dr. at I-5 SB Ramps
ITAM 18 Alt 2 (IRVINE ISEC)
AM PK HOUR
224 . Culver Dr. at Walnut Av.
ITAM 18 Alt 2 (IRVINE ISEC)
PM PK HOUR AM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C LANES CAPACITY VOL V/C VOL V/C NBL
NBT
NBR
0 4
f
0 6800
0 1282
334
0 2461
559
NBL
NBT
NBR
2 3
1 3400
5100
1700
140
891
342
.04*
.17
.20
241
1991
331
.07
.39*
.19
.19 .36*
SBL
SBT
SBR
0 3
f
0 5100
0 2638
595
0 SBL
SBT
SBR
2 3
1 3400
5100
1700
196
2073
424
.06 347 .10*
.28
.23
.52* 1720
300
.34 .41* 1420
.25 395
EBL
EBT
EBR
3 0
2 5100
0 3400
388
0 452
.08*
.13
975
0 836
.19*
.25
EBL
EBT
EBR
2 2
1 3400
3400
1700
419
612
252
.12
.18*
.15
599
552
131
.18*
.16
.08
WBL
WBT
WBR
0 0
0 0
0 0
0 0
0 0
0 0
WBL
WBT
WBR
2 2
1 3400
3400
1700
456
586
280
.13*
.17
.16
369
663
249
.11
.20*
.15
Right Turn Adjustment
Clearance Interval
EBR .05*
.05*
EBR .04*
.05*
Clearance Interval .05* .05*
Note: Assumes Right-Turn Overlap for NBR
TOTAL CAPACITY UTILIZATION
Friday, December 14, 2018
.70 .64 TOTAL CAPACITY UTILIZATION .81 .92
City Council
21 –
73 4/16/2024
225 . Culver Dr. at Deerfield Dr.
ITAM 18 Alt 2 (IRVINE ISEC)
AM PK HOUR
226 . Culver Dr. at ICD
ITAM 18 Alt 2 (IRVINE ISEC)
PM PK HOUR AM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C LANES CAPACITY VOL V/C VOL V/C NBL
NBT
NBR
2 3
1 3400
5100
1700
42 998
93 .01*
.20
.05
90 2066
127
.03
.41*
.07
NBL
NBT
NBR
2 4
f
3400
6800
292
796
242
.09*
.12
413
1849
377
.12
.27*
SBL
SBT
SBR
2 3
1 3400
5100
1700
177
2320
280
.05 124 .04*
.30
.18
SBL
SBT
SBR
2 4
1 3400
6800
1700
350
2025
253
.10 231 .07*
.20
.14
.45* 1515 .30* 1339
.16 298 .15 230
EBL
EBT
EBR
1 1
d
1700
1700
1700
175
160
105
.10*
.09
.06
391
139
131
.23*
.08
.08
EBL
EBT
EBR
2 3
f
3400
5100
194
1410
397
.06
.28* 1023
285
320 .09*
.20
WBL
WBT
WBR
1 1
0 1700
1700
0 136
158
177
.08
.20*
84 92
103
.05
.11*
WBL
WBT
WBR
2 3
f
3400
5100
372
1065
121
.11*
.21
305
1767
220
.09
.35*
Clearance Interval .05*
.81
.05*
.84
Clearance Interval
TOTAL CAPACITY UTILIZATION
.05*
.83
.05*
.83TOTAL CAPACITY UTILIZATION
227 . Culver Dr. at Warner Av.
ITAM 18 Alt 2 (IRVINE ISEC)
228 . Culver Dr. at Barranca Pkwy.
ITAM 18 Alt 2 (IRVINE ISEC)
AM PK HOURAM PK HOUR PM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C LANES CAPACITY VOL V/C VOL V/C NBL
NBT
NBR
1 3
1 1700
5100
1700
132
1046
99 .08*
.21
.06
201
2286
147
.12
.45*
.09
NBL
NBT
NBR
2 3
1 3400
5100
1700
132
893
345
.04*
.18
.20
304
1901
342
.09
.37*
.20
SBL
SBT
SBR
1 3
d
1700
5100
1700
100
2499
195
.06 128 .08*
.28
.21
SBL
SBT
SBR
2 3
f
3400
5100
468
2042
240
.14
.40* 1219
296
208 .06*
.24.49* 1449
.11 359
EBL
EBT
EBR
2 2
d
3400
3400
1700
212
292
246
.06
.09*
.14
232
255
143
.07*
.08
.08
EBL
EBT
EBR
2 2
1 3400
3400
1700
197
850
242
.06
.25*
.14
456
870
303
.13*
.26
.18
WBL
WBT
WBR
1 2
d
1700
3400
1700
145
263
112
.09*
.08
.07
98 290
142
.06
.09*
.08
WBL
WBT
WBR
2 3
0 3400
5100
0 339
719
181
.10*
.18
268
960
262
.08
.24*
Clearance Interval .05*
.80
.05*
.74
Clearance Interval
TOTAL CAPACITY UTILIZATION
.05*
.84
.05*
.85TOTAL CAPACITY UTILIZATION
Friday, December 14, 2018 Page 24
City Council
21 –
74 4/16/2024
229 . Culver Dr. at Alton Pkwy.
ITAM 18 Alt 2 (IRVINE ISEC)
230 . Culver Dr. at Main St.
ITAM 18 Alt 2 (IRVINE ISEC)
AM PK HOUR PM PK HOUR AM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C LANES CAPACITY VOL V/C VOL V/C NBL
NBT
NBR
2 3
1 3400
5100
1700
139
1108
318
.04*
.22
.19
248
2272
371
.07
.45*
.22
NBL
NBT
NBR
2 3
1 3400
5100
1700
96 1335
126
.03*
.26
.07
150
2370
374
.04
.46*
.22
SBL
SBT
SBR
2 3
f
3400
5100
221
2219
334
.07
.44* 1259
319
292 .09*
.25
SBL
SBT
SBR
2 3
f
3400
5100
106
2118
430
.03
.42* 1475
169
219 .06*
.29
EBL
EBT
EBR
2 2
1 3400
3400
1700
218
672
183
.06
.20*
.11
362
861
277
.11*
.25
.16
EBL
EBT
EBR
2 2
f
3400
3400
191
142
169
.06
.04*
601
446
236
.18*
.13
WBL
WBT
WBR
2 2
1 3400
3400
1700
289
707
234
.09*
.21
.14
279
767
274
.08
.23*
.16
WBL
WBT
WBR
2 2
1 3400
3400
1700
462
323
152
.14*
.10
.09
139
92 69
.04
.03*
.04
Clearance Interval
TOTAL CAPACITY UTILIZATION
.05*
.82
.05*
.93
Clearance Interval
TOTAL CAPACITY UTILIZATION
.05*
.68
.05*
.78
231 . Culver Dr. at Paseo Westpark
ITAM 18 Alt 2 (IRVINE ISEC)
AM PK HOUR
232 . Culver Dr. at I-405 NB Ramps
ITAM 18 Alt 2 (IRVINE ISEC)
AM PK HOURPM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C LANES CAPACITY VOL V/C VOL V/C NBL
NBT
NBR
1 3
0 1700
5100
0 191
1399
0 .11*
.27
312
2761
0 .18
.54*
NBL
NBT
NBR
0 3
f
0 5100
0 1405
740
0 2488
290
.28 .49*
SBL
SBT
SBR
0 3
d
0 5100
1700
0 2598
153
0 SBL
SBT
SBR
0 3
f
0 5100
0 1887
1250
0 .51* 1768 .35
.05
.37* 1565
430
.31
.09 78
EBL
EBT
EBR
1 0
1 1700
0 1700
70 0
319
.04*
.19
59 0
92 .03*
.05
EBL
EBT
EBR
0 0
0 0
0 0
0 0
0 0
0 0
WBL
WBT
WBR
0 0
0 0
0 0
0 0
0 0
0 0
WBL
WBT
WBR
2 0
1 3400
0 1700
973
0 255
.29*
.15
785
0 652
.23*
.38
Right Turn Adjustment
Clearance Interval
EBR .07*
.05*
Right Turn Adjustment
Clearance Interval
WBR .15*
.05*.05*
.62
.05*
.71TOTAL CAPACITY UTILIZATION
Friday, December 14, 2018
.78 TOTAL CAPACITY UTILIZATION .92
City Council
21 –
75 4/16/2024
233 . Culver Dr. at I-405 SB Ramps
ITAM 18 Alt 2 (IRVINE ISEC)
AM PK HOUR
234 . Culver Dr. at Michelson Dr.
ITAM 18 Alt 2 (IRVINE ISEC)
AM PK HOURPM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C LANES CAPACITY VOL V/C VOL V/C NBL
NBT
NBR
0 3
f
0 5100
0 1393
570
0 1714
1242
NBL
NBT
NBR
2 3
0 3400
5100
0 224
1208
29 .07*
.24
373
1796
25 .11
.36*.27 .34
SBL
SBT
SBR
0 3
f
0 5100
0 2390
430
0 SBL
SBT
SBR
2 3
1 3400
5100
1700
211
1823
726
.06 443 .13*
.26
.25
.47* 1798
400
.35* .36* 1319
.43 431
EBL
EBT
EBR
1.5 0
1.5 727
0 360
.21* 1078
0 .32*
.25
EBL
EBT
EBR
2 1
1 3400
1700
1700
359
181
171
.11*
.11
.10
911
341
250
.27*
.20
.15
5100
.21 429
WBL
WBT
WBR
0 0
0 0
0 0
0 0
0 0
0 0
WBL
WBT
WBR
1 1.5
1.5 1700
5100
85 .05 91 .05
174 {.05}*
260 {.01}
187 {.06}*
223 {.03}
Clearance Interval
TOTAL CAPACITY UTILIZATION
.05*
.73
.05*
.72
Clearance Interval .05*
.64
.05*
.87TOTAL CAPACITY UTILIZATION
235 . Culver Dr. at University Dr.
ITAM 18 Alt 2 (IRVINE ISEC)
AM PK HOUR
337 . Von Karman Ave. at Quartz
ITAM 18 Alt 2 (IRVINE ISEC)
PM PK HOUR AM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C LANES CAPACITY VOL V/C VOL V/C NBL
NBT
NBR
2 4
2 3400
6800
3400
61 1176
784
.02*
.17
.23
56 1523
820
.02*
.22
.24
NBL
NBT
NBR
1 2
1 1700
3400
1700
260
1246
229
.15*
.37
.13
118
2145
70 .07
.63*
.04
SBL
SBT
SBR
2 3
d
3400
5100
1700
61 1367
369
.02 67 .02
.22*
.13
SBL
SBT
SBR
1 2
d
1700
3400
1700
428
1899
468
.25 76 .04*
.37
.08
.27* 1123 .56* 1251
.22 214 .28 141
EBL
EBT
EBR
2 3
d
3400
5100
1700
99 1155
73 .03 418 .12
.33*
.04
EBL
EBT
EBR
2 1
1 3400
1700
1700
42 6
51 .01
.00*
.03
393
14 277
.12*
.01
.16
.23* 1662
.04 70
WBL
WBT
WBR
2 3
0 3400
5100
0 1030
1810
45 .30*
.36
777
1290
79 .23*
.27
WBL
WBT
WBR
1 1
f
1700
1700
42 7
91 .02*
.00
92 11
422
.05
.01*
Clearance Interval .05* .05*
.85
Clearance Interval
TOTAL CAPACITY UTILIZATION
.05*
.78
.05*
.85
Note: Assumes Right-Turn Overlap for NBR
TOTAL CAPACITY UTILIZATION
Friday, December 14, 2018
.87
City Council
21 –
76 4/16/2024
439 . Bixby at Michleson Dr.
ITAM 18 Alt 2 (IRVINE ISEC)
440 . Siglo at Main St.
ITAM 18 Alt 2 (IRVINE ISEC)
AM PK HOUR PM PK HOUR AM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C LANES CAPACITY VOL V/C VOL V/C NBL
NBT
NBR
1 1
0 1700
1700
0 14
9 7
.01*
.01
34 3
33 .02*
.02
NBL
NBT
NBR
0 0
0 0
0 0
0 0
0 0
0 0
SBL
SBT
SBR
2 1
0 3400
1700
0 28
2 61
.01
.04*
210
1 349
.06
.21*
SBL
SBT
SBR
2 0
1 3400
0 1700
152
0 68
.04*
.04
298
0 182
.09*
.11
EBL
EBT
EBR
1 2
0 1700
3400
0 400
485
31 .24*
.15
136
691
36 .08*
.21
EBL
EBT
EBR
2 3
0 3400
5100
0 159
848
0 .05*
.17
115
2162
0 .03
.42*
WBL
WBT
WBR
1 2
1 1700
3400
1700
27 475
241
.02
.14*
.14
43 683
42 .03
.20*
.02
WBL
WBT
WBR
0 3
1 0
5100
1700
0 1322
191
0 .26* 1128 .22
.11.11 195
Clearance Interval .05*
.48
.05*
.56
Clearance Interval .05*
.40
.05*
.56TOTAL CAPACITY UTILIZATION TOTAL CAPACITY UTILIZATION 441 . Loop Rd. at Jamboree Rd. SB Ramps
ITAM 18 Alt 2 (IRVINE ISEC)
AM PK HOUR
472 . Obsidian at Michleson Dr.
ITAM 18 Alt 2 (IRVINE ISEC)
PM PK HOUR AM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C LANES CAPACITY VOL V/C VOL V/C NBL
NBT
NBR
0 2
1 0
3400
1700
1 0
52 3
1 192
NBL
NBT
NBR
0 1
0 0
1700
0 7
2 21
27 0
93 .00*
.03
.00*
.11
.02* .07*
SBL
SBT
SBR
1 2
0 1700
3400
0 288
0 15
.17*
.00
558
2 75
.33*
.00
.04
SBL
SBT
SBR
0 1
f
0 1700
41 {.02}* 376 {.22}*
4 .03 0 .22
17 243
EBL
EBT
EBR
0 0
0 0
0 0
0 0
0 0
0 0
EBL
EBT
EBR
1 2
0 1700
3400
0 136
748
40 .08*
.23
11 940
9 .01*
.28
WBL
WBT
WBR
2 0
1 3400
0 1700
180
322
510
.05*
.30
110
499
979
.03*
.58
WBL
WBT
WBR
1 2
1 1700
3400
1700
75 1076
722
.04 21 .01
.33*
.03
.32* 1118
.42 50
Right Turn Adjustment
Clearance Interval
WBR .12* Multi
.05*
.39*
.05*
Right Turn Adjustment
Clearance Interval
WBR .08*
.05* .05*
.68TOTAL CAPACITY UTILIZATION
Friday, December 14, 2018
.39 .80 TOTAL CAPACITY UTILIZATION .57
City Council
21 –
77 4/16/2024
10 . SR-55 Frontage Rd. SB at Paularino Av.
ITAM 18 Alt 2 (COSTA MESA ISEC)
11 . SR-55 Frontage Rd. NB at Paularino Av.
ITAM 18 Alt 2 (COSTA MESA ISEC)
AM PK HOUR PM PK HOUR AM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C LANES CAPACITY VOL V/C VOL V/C NBL
NBT
NBR
0 0
0 0
0 0
0 0
0 0
0 0
NBL
NBT
NBR
0 2
d
0 3200
1600
86 1053
216
138
607
155
.36*
.14
.23*
.10
SBL
SBT
SBR
0 2
0 0
3200
0 698
848
204
188
959
351
SBL
SBT
SBR
0 0
0 0
0 0
0 0
0 0
0 0
.55*
.29*
.47*
.17*
EBL
EBT
EBR
0 2
0 0
3200
0 0
807
133
0 365
175
EBL
EBT
EBR
1 2
0 1600
3200
0 341
1174
0 .21
.37*
167
385
0 .10*
.12
WBL
WBT
WBR
1 2
0 1600
3200
0 32
158
0 .02*
.05
225
706
0 .14*
.22
WBL
WBT
WBR
0 2
1 0
3200
1600
0 104
167
0 772
446
.03
.10
.24*
.28
Right Turn Adjustment
TOTAL CAPACITY UTILIZATION
WBR .04*
.61
TOTAL CAPACITY UTILIZATION .86 .78
.73
12 . SR-55 Frontage Rd. SB at Baker St.
ITAM 18 Alt 2 (COSTA MESA ISEC)
13 . SR-55 Frontage Rd. NB at Baker St.
ITAM 18 Alt 2 (COSTA MESA ISEC)
AM PK HOUR PM PK HOUR AM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C LANES CAPACITY
1.5 VOL V/C VOL V/C
NBL
NBT
NBR
0 0
0 0
0 0
0 0
0 0
0 0
NBL
NBT
NBR
278
505
424
.17
.32*
.26
297
315
408
.19
.20*
.26
1.5 0
4800
SBL
SBT
SBR
1 0.5
1.5 1600
3200
543
162 {.10}
275
.34* 130
443 {.37}*
776
.08 SBL
SBT
SBR
0 0
0 0
0 0
0 0
0 0
0 0
EBL
EBT
EBR
0 2
1 0
3200
1600
0 1669
312
0 592
419
EBL
EBT
EBR
1 2
0 1600
3200
0 695
1486
0 .43*
.46
276
485
0 .17*
.15.52*
.20
.19*
.26
WBL
WBT
WBR
1 2
0 1600
3200
0 84
415
0 .05*
.13
291
1089
0 .18*
.34
WBL
WBT
WBR
0 2
1 0
3200
1600
0 222
110
0 .07* 1067 .33*
.19.07 302
Right Turn Adjustment EBR .07*
.81
TOTAL CAPACITY UTILIZATION .82 .70
TOTAL CAPACITY UTILIZATION
Friday, December 14, 2018
.91
City Council
21 –
78 4/16/2024
50 . Red Hill Av. at Paularino Av.
ITAM 18 Alt 2 (COSTA MESA ISEC)
AM PK HOUR
51 . Red Hill Av. at Baker St.
ITAM 18 Alt 2 (COSTA MESA ISEC)
PM PK HOUR AM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C LANES CAPACITY VOL V/C VOL V/C NBL
NBT
NBR
2 2
0 3200
3200
0 122
1401
79 .04
.46* 1057
17 168 .05*
.34
NBL
NBT
NBR
2 2
0 3200
3200
0 141
870
59 .04
.29*
317
756
16 .10*
.24
SBL
SBT
SBR
1 2
0 1600
3200
0 67
417
40 .04*
.14
44 852
223
.03
.34*
SBL
SBT
SBR
1 2
0 1600
3200
0 42
442
115
.03*
.17
11 574
386
.01
.30*
EBL
EBT
EBR
1 2
0 1600
3200
0 185
563
165
.12
.23*
228
132
99 .14*
.07
EBL
EBT
EBR
1.5 1.5
1 828
299
203
.26*
.19
.13
471
64 165
.15*
.04
.10
4800
1600
WBL
WBT
WBR
1 2
0 1600
3200
0 18
78 24
.01*
.03
53 431
85 .03
.16*
WBL
WBT
WBR
1 2
0 1600
3200
0 9
39 21
.01
.02*
50 351
50 .03
.13*
TOTAL CAPACITY UTILIZATION .74 .69 TOTAL CAPACITY UTILIZATION .60 .68 52 . Red Hill Av. at Bristol St.
ITAM 18 Alt 2 (COSTA MESA ISEC)
AM PK HOUR
541 . Bear St. at Baker St.
ITAM 18 Alt 2 (COSTA MESA ISEC)
PM PK HOUR AM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C LANES CAPACITY VOL V/C VOL V/C NBL
NBT
NBR
2 1.5
1.5 3200
4800
133
468
160
.04
.15*
.10
98 176
67 .03
.06*
NBL
NBT
NBR
1 1
0 1600
1600
0 54
119
39 .03
.10*
218
227
26 .14*
.16
SBL
SBT
SBR
2 2
1 3200
3200
1600
336
124
126
.11*
.04
.08
524
420
448
.16*
.13
.28
SBL
SBT
SBR
2 1
2 3200
1600
3200
343
252
304
.11*
.16
.10
271
184
625
.08
.12*
.20
EBL
EBT
EBR
2 3
1 3200
4800
1600
525
1164
91 .16*
.24
.06
185
579
118
.06*
.12
.07
EBL
EBT
EBR
2 2
0 3200
3200
0 323
1459
212
.10
.52*
229
583
89 .07*
.21
WBL
WBT
WBR
2 3
1 3200
4800
1600
45 501
657
.01 122 .04
.32*
.23
WBL
WBT
WBR
1 3
0 1600
4800
0 26
411
127
.02*
.11
27 1677
315
.02
.10* 1543 .42*
.41 369
SBRRight Turn Adjustment WBR .23*
.75
.04*
.64
Right Turn Adjustment
Note: Assumes Right-Turn Overlap for SBR
SBR .01*
.76
TOTAL CAPACITY UTILIZATION
Friday, December 14, 2018
TOTAL CAPACITY UTILIZATION .75
City Council
21 –
79 4/16/2024
542 . Bear St. at Paularino Av.
ITAM 18 Alt 2 (COSTA MESA ISEC)
545 . Bristol St. at Sunflower Av.
ITAM 18 Alt 2 (COSTA MESA ISEC)
AM PK HOURAM PK HOUR PM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C LANES CAPACITY VOL V/C VOL V/C NBL
NBT
NBR
1 3
0 1600
4800
0 16
714
258
.01
.20* 1645
142
41 .03
.37*
NBL
NBT
NBR
3 2.5
1.5 4800
6400
102
603
175
.02*
.13
.11
629
1813
212
.13
.38*
.13
SBL
SBT
SBR
1 3
0 1600
4800
0 293
989
10 .18*
.21
129
1019
15 .08*
.22
SBL
SBT
SBR
2 3
1 3200
4800
1600
303
1714
113
.09
.36*
.07
208
934
230
.07*
.19
.14
EBL
EBT
EBR
1 1
0 1600
1600
0 11
25 33
.01
.04*
16 11
33 .01
.03*
EBL
EBT
EBR
2 2.5
1.5 3200
6400
124
993
444
.04
.22*
334
490 {.10}
277
.10*
WBL
WBT
WBR
1 1
1 1600
1600
1600
111
4 74
.07*
.00
.05
365
34 290
.23*
.02
.18
WBL
WBT
WBR
2 4
d
3200
6400
1600
250
299
150
.08*
.05
.09
289
1221
343
.09
.19*
.21
TOTAL CAPACITY UTILIZATION .49 .71 TOTAL CAPACITY UTILIZATION .68 .74 546 . Bristol St. at Anton Blvd.
ITAM 18 Alt 2 (COSTA MESA ISEC)
AM PK HOUR
547 . Bristol St. at Paularino Av.
ITAM 18 Alt 2 (COSTA MESA ISEC)
AM PK HOURPM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C LANES CAPACITY VOL V/C VOL V/C NBL
NBT
NBR
2 4
f
3200
6400
49 986
1147
.02*
.15
388
2122
788
.12
.33*
NBL
NBT
NBR
2 4
0 3200
6400
0 13
829
74 .00
.14
145
1278
101
.05*
.22
SBL
SBT
SBR
2 4
1 3200
6400
1600
291
1985
12 .09 198 .06*
.22
.06
SBL
SBT
SBR
2 3
0 3200
4800
0 307
1303
44 .10
.28* 1467
171
295 .09
.34*.31* 1417
.01 88
EBL
EBT
EBR
1 1
1 1600
1600
1600
8 21
11 .01
.01*
.01
115
54 120
.07
.03*
.08
EBL
EBT
EBR
1 1
1 1600
1600
1600
223
321
35 .14
.20*
.02
114
144
53 .07*
.09
.03
WBL
WBT
WBR
3 1
1 4800
1600
1600
584
19 136
.12*
.01
.09
966
105
417
.20*
.07
.26
WBL
WBT
WBR
2 1
1 3200
1600
1600
86 72
191
.03*
.05
.12
190
534
408
.06
.33*
.26
Right Turn Adjustment
Note: Assumes Right-Turn Overlap for WBR
WBR .04*
.66
TOTAL CAPACITY UTILIZATION .51 .79
TOTAL CAPACITY UTILIZATION .46
Friday, December 14, 2018 Page 30
City Council
21 –
80 4/16/2024
548 . Bristol St. at Baker St.
ITAM 18 Alt 2 (COSTA MESA ISEC)
549 . Bristol St. at Newport Blvd. SB
ITAM 18 Alt 2 (COSTA MESA ISEC)
AM PK HOURAM PK HOUR PM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C LANES CAPACITY VOL V/C VOL V/C NBL
NBT
NBR
2 4
1 3200
6400
1600
54 416
231
.02
.07*
.14
273
905
254
.09
.14*
.16
NBL
NBT
NBR
2 3
0 3200
4800
0 258
760
8 .08*
.16
780
1609
9 .24*
.34
SBL
SBT
SBR
2 3
1 3200
4800
1600
483
815
173
.15*
.17
.11
450
794
548
.14*
.17
.34
SBL
SBT
SBR
0 3
d
0 4800
1600
0 1100
312
0 664
537
.23*
.20
.14*
.34
EBL
EBT
EBR
3 3
0 4800
4800
0 304
1276
100
.06
.29*
314
456
112
.07*
.12
EBL
EBT
EBR
0 0
0 0
0 0
0 0
0 0
0 0
WBL
WBT
WBR
2 3
1 3200
4800
1600
220
286
234
.07*
.06
.15
314
1159
340
.10
.24*
.21
WBL
WBT
WBR
0 0
0 0
0 0
0 0
0 0
0 0
Right Turn Adjustment SBR .08* Right Turn Adjustment
TOTAL CAPACITY UTILIZATION
SBR .20*
.58
Note: Assumes Right-Turn Overlap for SBR NBR
.31
TOTAL CAPACITY UTILIZATION .58 .67
550 . Bristol St. at Newport Blvd. NB
ITAM 18 Alt 2 (COSTA MESA ISEC)
AM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C
NBL
NBT
NBR
0 3
0 0
4800
0 0
689
0 0
2125
0 .14 .44*
SBL
SBT
SBR
0 3
0 0
4800
0 0
1091
0 0
655
0 .23* .14
EBL
EBT
EBR
1.5 0
1.5 351 {.20}* 295
0 .09*
4800 2 .20
629 226 {.00}
WBL
WBT
WBR
0 0
0 0
0 0
0 0
0 0
0 0
TOTAL CAPACITY UTILIZATION
Friday, December 14, 2018
.43 .53
City Council
21 –
81 4/16/2024
715 . Bristol St. at I-405 NB Ramps
ITAM 18 Alt 2 (COSTA MESA ISEC)
AM PK HOUR
716 . Bristol St. at I-405 SB Ramps
ITAM 18 Alt 2 (COSTA MESA ISEC)
AM PK HOURPM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C LANES CAPACITY VOL V/C VOL V/C NBL
NBT
NBR
0 4
0 0
6400
0 0
1577
160
0 2275
230
NBL
NBT
NBR
1 4
0 1600
6400
0 90
1158
0 .06*
.18
150
1875
0 .09*
.29.27 .39*
SBL
SBT
SBR
0 5
0 0
8000
0 0
2629
10 0 SBL
SBT
SBR
0 3
f
0 0
1474
1014
0 .33* 2485
23 .31 4800 .31* 1786
977
.37*
.14*EBL
EBT
EBR
0 0
2 0
0 3200
0 0
50 1
0 280
EBL
EBT
EBR
3 0
f
4800
0 569
0 424
.12* 695
0 256.02 .09
WBL
WBT
WBR
1.5 1.5
2 181
50 593
.06*
.03
.19
635
387
1034
WBL
WBT
WBR
0 0
0 0
0 0
0 0
0 0
0 0
4800
3200
.21*
.32
Right Turn Adjustment Multi
Note: Assumes E/W Split Phasing
.10* Multi
.49
.14*
TOTAL CAPACITY UTILIZATION .49 .60
TOTAL CAPACITY UTILIZATION .74
717 . Bear St. at SR-73 SB Ramps
ITAM 18 Alt 2 (COSTA MESA ISEC)
AM PK HOUR
720 . Flower St. at MacArthur Blvd.
ITAM 18 Alt 2 (COSTA MESA ISEC)
AM PK HOURPM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C LANES CAPACITY VOL V/C VOL V/C NBL
NBT
NBR
0 2
0 0
3200
0 0
303
267
0 620
178
NBL
NBT
NBR
1 2
0 1600
3200
0 279
464
655
.17*
.29
.41
202
875
123
.13
.31*.18* .25*
SBL
SBT
SBR
2 2
0 3200
3200
0 563
617
0 .18*
.19
561
891
0 .18*
.28
SBL
SBT
SBR
1 2
0 1600
3200
0 127
549
176
.08
.23*
23 469
63 .01*
.17
EBL
EBT
EBR
1.5 0
0.5 127
0 273
.08*
.17
180
1 209
.11*
.13
EBL
EBT
EBR
1 3
0 1600
4800
0 81
1684
241
.05
.40* 1014
433
139 .09*
.303200
WBL
WBT
WBR
0 0
0 0
0 0
0 0
0 0
0 0
WBL
WBT
WBR
1 3
0 1600
4800
0 116
790
35 .07*
.17
418
2125
136
.26
.47*
Right Turn Adjustment NBR .04*
.91
TOTAL CAPACITY UTILIZATION
Friday, December 14, 2018
.44 .54
TOTAL CAPACITY UTILIZATION .88
City Council
21 –
82 4/16/2024
721 . Flower St. at Sunflower Av.
ITAM 18 Alt 2 (COSTA MESA ISEC)
AM PK HOUR
722 . Anton Blvd. at Sunflower Av.
ITAM 18 Alt 2 (COSTA MESA ISEC)
AM PK HOURPM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C LANES CAPACITY VOL V/C VOL V/C NBL
NBT
NBR
1 2
1 1600
3200
1600
26 77
131
.02
.02*
.08
67 474
79 .04
.15*
.05
NBL
NBT
NBR
1 0
2 1600
0 3200
12 0
267
.01*
.08
13 0
676
.01*
.21
SBL
SBT
SBR
1 2
0 1600
3200
0 287
236
138
.18*
.12
87 128
184
.05*
.08
.12
SBL
SBT
SBR
0 0
0 0
0 0
0 0
0 0
0 0
EBL
EBT
EBR
2 3
0 3200
4800
0 112
1171
82 .04
.26*
275
665
74 .09*
.15
EBL
EBT
EBR
0 3
0 0
4800
0 0
1480
44 0
694
25 .32* .15
WBL
WBT
WBR
2 3
0 3200
4800
0 112
366
91 .04*
.10
85 1175
216
.03
.29*
WBL
WBT
WBR
2 3
0 3200
4800
0 257
410
0 .08*
.09
345
1447
0 .11
.30*
Right Turn Adjustment NBR .03*
.53
Right Turn Adjustment NBR .01*
.42
NBR .09*
.40TOTAL CAPACITY UTILIZATION .58 TOTAL CAPACITY UTILIZATION 726 . Main St. at Sunflower Av.
ITAM 18 Alt 2 (COSTA MESA ISEC)
735 . Newport Blvd. NB at Del Mar Av./University Dr.
ITAM 18 Alt 2 (COSTA MESA ISEC)
AM PK HOUR PM PK HOUR AM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C LANES CAPACITY VOL V/C VOL V/C NBL
NBT
NBR
2 3
0 3200
4800
0 284
219
3 .09* 1365 .43*
.26
NBL
NBT
NBR
0 3
1 0
4800
1600
165
1407
228
116
679
204
.05 1256
3 .33*
.14
.17*
.13
SBL
SBT
SBR
1 2
1 1600
3200
1600
8 851
336
.01
.27*
.21
3 269
400
.00
.08*
.25
SBL
SBT
SBR
0 0
0 0
0 0
0 0
0 0
0 0
EBL
EBT
EBR
1.5 0.5
2 411
3 1329
681
7 659
EBL
EBT
EBR
2 2
0 3200
3200
0 873
887
0 .27*
.28
334
646
0 .10*
.203200
3200
.13*
.42
.22*
.21
WBL
WBT
WBR
0 1
0 0
1600
0 0
0 0
0 0
0 WBL
WBT
WBR
0 1.5
1.5 0 0
428
372
0 854
317
.00* .00*
.73
4800 .17*
.77
.27*
.20
Right Turn Adjustment
Note: Assumes E/W Split Phasing
Note: Assumes Right-Turn Overlap for EBR
EBR .20*
TOTAL CAPACITY UTILIZATION .54
TOTAL CAPACITY UTILIZATION
Friday, December 14, 2018
.69
City Council
21 –
83 4/16/2024
736 . Newport Blvd. SB at Del Mar Av./University
ITAM 18 Alt 2 (COSTA MESA ISEC)
737 . Newport Blvd. NB at Mesa Dr.
ITAM 18 Alt 2 (COSTA MESA ISEC)
AM PK HOUR PM PK HOURAM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C LANES CAPACITY VOL V/C VOL V/C NBL
NBT
NBR
0 0
0 0
0 0
0 0
0 0
0 0
NBL
NBT
NBR
1 2
d
1600
3200
1600
33 783
162
.02
.24*
.10
35 386
71 .02
.12*
.04
SBL
SBT
SBR
1 3
f
1600
4800
261
551
386
.16*
.11
392
1610
1218
.25
.34*
SBL
SBT
SBR
0 0
0 0
0 0
0 0
0 0
0 0
EBL
EBT
EBR
0 4
0 0
6400
0 0
1504
50 1
548
52 EBL
EBT
EBR
2 1
0 3200
1600
0 144
178
0 .05*
.11
91 229
0 .03*
.14.24* .09*
WBL
WBT
WBR
1 2
0 1600
3200
0 192
406
0 .12*
.13
248
722
0 .16*
.23
WBL
WBT
WBR
0 1
0 0
1600
0 0
177
43 0
295
34 .14*
.43
.21*
.36TOTAL CAPACITY UTILIZATION .52 .59 TOTAL CAPACITY UTILIZATION 738 . Newport Blvd. SB at Mesa Dr.
ITAM 18 Alt 2 (COSTA MESA ISEC)
AM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C
NBL
NBT
NBR
0 0
0 0
0 0
0 0
0 0
0 0
SBL
SBT
SBR
1 4
1 1600
6400
1600
320
1140
0 .20*
.18
.00
323
2997
10 .20
.47*
.01
EBL
EBT
EBR
0 1
1 0
1600
1600
0 0
0 0
0 10
.00*
.00
.00*
.01
WBL
WBT
WBR
1 1
0 1600
1600
0 80
0 0
.05*
.00
350
0 .22*
.00
0 Right Turn Adjustment EBR .01*
.70TOTAL CAPACITY UTILIZATION
Friday, December 14, 2018
.25
City Council
21 –
84 4/16/2024
61 . Airport Wy. at Campus Dr.
ITAM 18 Alt 2 (NEWPORT BEACH ISEC)
AM PK HOUR
62 . Campus Dr. at Bristol St. NB
ITAM 18 Alt 2 (NEWPORT BEACH ISEC)
AM PK HOURPM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C LANES CAPACITY VOL V/C VOL V/C NBL
NBT
NBR
0 0
0 0
0 0
0 0
0 0
0 0
NBL
NBT
NBR
2 3
0 3200
4800
0 484
2699
0 .15
.56*
412
923
0 .13*
.19
SBL
SBT
SBR
0 0
2 0
0 0
0 0
0 SBL
SBT
SBR
0 4
3 0
6400
4800
0 266
314
0 1577
1409
.04
.07
.25*
.293200 411 .13
.26
1148 .36
EBL
EBT
EBR
1 3
0 1600
4800
0 422
2030
0 242
.42* 1230
0 .15*
.26
EBL
EBT
EBR
0 0
0 0
0 0
0 0
0 0
0 0
WBL
WBT
WBR
0 3
0 0
4800
0 0
349
198
0 1482
178
WBL
WBT
WBR
1 5
0 1600
8000
0 184
1362
371
.12 323 .20
.38*.11
.12
.35* .21* 2869
.23 187
Right Turn Adjustment SBR .13*
.55
SBR .36*
.86
Right Turn Adjustment WBR .02*
.79
SBR .04*
.80TOTAL CAPACITY UTILIZATION TOTAL CAPACITY UTILIZATION 63 . Campus Dr. at Bristol St. SB
ITAM 18 Alt 2 (NEWPORT BEACH ISEC)
AM PK HOUR
64 . Birch St. at Bristol St. NB
ITAM 18 Alt 2 (NEWPORT BEACH ISEC)
AM PK HOURPM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C LANES CAPACITY VOL V/C VOL V/C NBL
NBT
NBR
0 5
0 0
8000
0 0
1479
303
0 755
266
NBL
NBT
NBR
2 2
0 3200
3200
0 196
1513
0 .06
.47*
251
681
0 .08*
.21.22* .12*
.17
SBL
SBT
SBR
1 3
0 1600
4800
0 137
332
0 .09*
.07
402
1496
0 .25*
.31
SBL
SBT
SBR
0 1.5
2.5 0
6400
0 325
209
0 801
1082
.10
.07
.29*
EBL
EBT
EBR
1.5 2.5
2 1681 {.62}* 609 {.32}* EBL
EBT
EBR
0 0
0 0
0 0
0 0
0 0
0 0
6400
3200
2301
518
.62
.16
1435
546
.32
.17
WBL
WBT
WBR
0 0
0 0
0 0
0 0
0 0
0 0
WBL
WBT
WBR
1.5 3.5
0 505
1485
267
679
.28* 2037
179
8000 .36*
.73
Right Turn Adjustment NBR .05*
.74
TOTAL CAPACITY UTILIZATION .75
TOTAL CAPACITY UTILIZATION
Friday, December 14, 2018
.93
City Council
21 –
85 4/16/2024
65 . Birch St. at Bristol St. SB
ITAM 18 Alt 2 (NEWPORT BEACH ISEC)
AM PK HOUR
84 . MacArthur Bl. at Campus Dr.
ITAM 18 Alt 2 (NEWPORT BEACH ISEC)
AM PK HOURPM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C LANES CAPACITY VOL V/C VOL V/C NBL
NBT
NBR
0 2.5
1.5 0
6400
0 635
535
0 466
373
NBL
NBT
NBR
2 4
1 3200
6400
1600
39 1244
89 .01 143 .04
.25*
.05
.18* .13 .19* 1604
.06 72
SBL
SBT
SBR
2 2
0 3200
3200
0 244
677
0 .08*
.21
253
1249
0 .08
.39*
SBL
SBT
SBR
1 3.5
1.5 1600
8000
382
1179
196
.24*
.18
.12
536
1579
127
.34*
.25
.08
EBL
EBT
EBR
1.5 3.5
0 1075 {.35}*
1481
283
434 {.26}*
1434
211
EBL
EBT
EBR
2 3
d
3200
4800
1600
779
1229
84 .24*
.26
.05
461
641
177
.14*
.13
.11
8000 .35 .26
WBL
WBT
WBR
0 0
0 0
0 0
0 0
0 0
0 0
WBL
WBT
WBR
2 3
f
3200
4800
147
335
127
.05
.07* 1000
165
174 .05
.21*
TOTAL CAPACITY UTILIZATION .61 .65 TOTAL CAPACITY UTILIZATION .74 .94 85 . MacArthur Bl. at Birch St.
ITAM 18 Alt 2 (NEWPORT BEACH ISEC)
AM PK HOUR
105 . Von Karman Av. at Campus Dr.
ITAM 18 Alt 2 (NEWPORT BEACH ISEC)
AM PK HOURPM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C LANES CAPACITY VOL V/C VOL V/C NBL
NBT
NBR
1 3
f
1600
4800
59 993
150
.04
.21*
145
781
35 .09*
.16
NBL
NBT
NBR
1 2
f
1600
3200
13 848
101
.01
.26*
59 763
221
.04*
.24
SBL
SBT
SBR
1 4
0 1600
6400
0 169
867
352
.11*
.18
.22
118
1221
308
.07
.24*
SBL
SBT
SBR
1 2
0 1600
3200
0 187
751
120
.12*
.27
250
963
274
.16
.39*
EBL
EBT
EBR
1.5 1.5
0 181
561
78 .11
.20*
418
467
67 EBL
EBT
EBR
1 2
f
1600
3200
358
851
63 .22*
.27
198
719
86 .12*
.224800 .20*
WBL
WBT
WBR
1 2
f
1600
3200
85 409
126
.05
.13*
132
797
231
.08
.25*
WBL
WBT
WBR
1 2
0 1600
3200
0 127
328
154
.08
.15*
131
758
189
.08
.30*
Note: Assumes E/W Split Phasing
TOTAL CAPACITY UTILIZATION
TOTAL CAPACITY UTILIZATION .75 .85
.65 .78
Friday, December 14, 2018 Page 36
City Council
21 –
86 4/16/2024
106 . Von Karman Av. at Birch St.
ITAM 18 Alt 2 (NEWPORT BEACH ISEC)
AM PK HOUR
107 . Von Karman Av. at MacArthur Bl.
ITAM 18 Alt 2 (NEWPORT BEACH ISEC)
AM PK HOURPM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C LANES CAPACITY VOL V/C VOL V/C NBL
NBT
NBR
1 2
d
1600
3200
1600
44 671
51 .03
.21*
.03
78 634
138
.05*
.20
.09
NBL
NBT
NBR
1 2
f
1600
3200
62 156
53 .04*
.05
157
341
272
.10
.11*
SBL
SBT
SBR
1 2
d
1600
3200
1600
83 445
245
.05*
.14
.15
57 803
170
.04
.25*
.11
SBL
SBT
SBR
2 1
f
3200
1600
253
231
56 .08
.14*
742
223
115
.23*
.14
EBL
EBT
EBR
1 2
d
1600
3200
1600
134
366
79 .08*
.11
.05
160
435
74 .10*
.14
.05
EBL
EBT
EBR
1 3
f
1600
4800
84 604
203
.05*
.13
119
1162
118
.07
.24*
WBL
WBT
WBR
1 2
d
1600
3200
1600
106
502
45 .07
.16*
.03
52 522
115
.03
.16*
.07
WBL
WBT
WBR
1 3
f
1600
4800
57 1131
700
.04
.24*
150
690
171
.09*
.14
TOTAL CAPACITY UTILIZATION .50 .56 TOTAL CAPACITY UTILIZATION .47 .67 121 . Teller Av. at Campus Dr. 147 . Jamboree Rd. at Campus Dr.
ITAM 18 Alt 2 (NEWPORT BEACH ISEC)
AM PK HOUR
ITAM 18 Alt 2 (NEWPORT BEACH ISEC)
AM PK HOUR PM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C LANES CAPACITY VOL V/C VOL V/C NBL
NBT
NBR
1 1
1 1600
1600
1600
8 34
69 .01*
.02
.04
41 152
86 .03
.10*
.05
NBL
NBT
NBR
2 4
0 3200
6400
0 157
1609
243
.05
.29* 1926
454
96 .03
.37*
SBL
SBT
SBR
1 1
0 1600
1600
0 92
132
77 .06
.13*
139
74 117
.09*
.12
SBL
SBT
SBR
2 4
0 3200
6400
0 360
1777
87 .11*
.29
251
2017
287
.08*
.36
EBL
EBT
EBR
1 2
f
1600
3200
67 779
77 .04
.24* 1045
44 71 .04
.33*
EBL
EBT
EBR
2 2
f
3200
3200
201
697
79 .06
.22*
278
835
247
.09
.26*
WBL
WBT
WBR
1 2
0 1600
3200
0 111
505
119
.07*
.20
101
732
106
.06*
.26
WBL
WBT
WBR
2 2
1 3200
3200
1600
674
377
151
.21*
.12
.09
357
707
386
.11*
.22
.24
TOTAL CAPACITY UTILIZATION .45 .58 TOTAL CAPACITY UTILIZATION .83 .82 Friday, December 14, 2018 Page 37
City Council
21 –
87 4/16/2024
148 . Jamboree Rd. at Birch St.
ITAM 18 Alt 2 (NEWPORT BEACH ISEC)
AM PK HOUR
149 . Jamboree Rd. at Fairchild Rd.
ITAM 18 Alt 2 (NEWPORT BEACH ISEC)
AM PK HOURPM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C LANES CAPACITY VOL V/C VOL V/C NBL
NBT
NBR
1 3
0 1600
4800
0 308
1633
3 .19*
.34
75 2171
0 .05
.45*
NBL
NBT
NBR
1 3
0 1600
4800
0 1
1551
69 .00
.34* 1740
16 47 .03
.37*
SBL
SBT
SBR
1 3
f
1600
4800
6 1936
632
.00
.40* 1469
1165
6 .00
.31
SBL
SBT
SBR
2 4
d
3200
6400
1600
411
1612
1 .13*
.25
.00
201
2356
6 .06*
.37
.00
EBL
EBT
EBR
1.5 0.5
f
247
3 409 EBL
EBT
EBR
1 1
0 1600
1600
0 22
21 27
.01 54
53 74
.03
3200 .08*
.00*
1 .13*
.00*
.03* .08*
84 241
WBL
WBT
WBR
0 1
0 0
1600
0 0
0 0
0 0
0 WBL
WBT
WBR
1 1
1 1600
1600
1600
25 1
412
.02*
.00
.26
70 7
487
.04*
.00
.30
Note: Assumes E/W Split Phasing
TOTAL CAPACITY UTILIZATION
Right Turn Adjustment WBR .22*
.74
WBR .21*
.76.67 .58 TOTAL CAPACITY UTILIZATION
150 . Jamboree Rd. at MacArthur Bl.
ITAM 18 Alt 2 (NEWPORT BEACH ISEC)
AM PK HOUR
151 . Jamboree Rd. at Bristol St. NB-SR73 NB Ramps
ITAM 18 Alt 2 (NEWPORT BEACH ISEC)
PM PK HOUR AM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C LANES CAPACITY VOL V/C VOL V/C NBL
NBT
NBR
2 4
d
3200
6400
1600
375
1157
231
.12 296 .09*
.16
.03
NBL
NBT
NBR
2 3
f
3200
4800
674
1790
700
.21
.37* 1380
790
677 .21*
.29.18* 1049
.14 47
SBL
SBT
SBR
3 3
1 4800
4800
1600
490
678
624
.10*
.14
.39
805
1518
356
.17
.32*
.22
SBL
SBT
SBR
0 3.5
1.5 0
8000
0 630
396
0 1120
1203
.13 .23*
.38
EBL
EBT
EBR
2 3
f
3200
4800
160
709
202
.05*
.15
241
1758
429
.08
.37*
EBL
EBT
EBR
0 0
0 0
0 0
0 0
0 0
0 0
WBL
WBT
WBR
2 3
1 3200
4800
1600
120
1531
633
.04
.32*
.40
304
709
459
.10*
.15
.29
WBL
WBT
WBR
0 0
0 0
0 0
0 0
0 0
0 0
Right Turn Adjustment SBR .23* Right Turn Adjustment
TOTAL CAPACITY UTILIZATION
SBR .15*
.59
Note: Assumes Right-Turn Overlap for WBR
.37
TOTAL CAPACITY UTILIZATION
Friday, December 14, 2018
.88 .88
City Council
21 –
88 4/16/2024
153 . Jamboree Rd. at Bristol St. SB
ITAM 18 Alt 2 (NEWPORT BEACH ISEC)
AM PK HOUR
154 . Jamboree Rd. at Eastbluff Dr.-University Dr.
ITAM 18 Alt 2 (NEWPORT BEACH ISEC)
PM PK HOUR AM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C LANES CAPACITY VOL V/C VOL V/C NBL
NBT
NBR
0 6
0 0
9600
0 0
1639
32 0 NBL
NBT
NBR
1 3
1 1600
4800
1600
98 1170
357
.06*
.24
.22
65 1523
338
.04
.32*
.21
.17* 1780
70 .19*
SBL
SBT
SBR
0 4
0 0
6400
0 0
650
0 0
1150
0 SBL
SBT
SBR
2 3
1 3200
4800
1600
68 1294
244
.02 100 .03*
.30
.21
.10 .18 .27* 1439
.15 338
EBL
EBT
EBR
1.5 1.5
2 1685
479
.53* 1030 {.41}* EBL
EBT
EBR
1.5 0.5
0 367
177
61 209
122
33 4800
3200
.30
.45
950 .41
.37
3200
4800
.19* .11*
1436 1180
WBL
WBT
WBR
0 0
0 0
0 0
0 0
0 0
0 0
WBL
WBT
WBR
1.5 1.5
f
544
228
183
.17*
.14
524
218
101
.16*
.14
Note: Assumes E/W Split Phasing
TOTAL CAPACITY UTILIZATION
TOTAL CAPACITY UTILIZATION .70 .60
.69 .62
155 . Jamboree Rd. at Bison Av. 156 . Jamboree Rd. at Ford Rd.
ITAM 18 Alt 2 (NEWPORT BEACH ISEC)
AM PK HOUR
ITAM 18 Alt 2 (NEWPORT BEACH ISEC)
AM PK HOURPM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C LANES CAPACITY VOL V/C VOL V/C NBL
NBT
NBR
0 3
d
0 4800
1600
0 1394
213
0 NBL
NBT
NBR
2 3
0 3200
4800
0 530
1240
98 .17*
.28
335
1744
223
.10*
.41.29* 1684 .35*
.08.13 129
SBL
SBT
SBR
2 3
1 3200
4800
1600
186
1630
50 .06*
.34
.03
156
1730
72 .05*
.36
.05
SBL
SBT
SBR
1 3
1 1600
4800
1600
50 1568
131
.03 63 .04
.37*
.07
.33* 1786
.08 110
EBL
EBT
EBR
1 0
1 1600
0 75
1 .05*
.04
.04
.04
139
2 .09*
.04
EBL
EBT
EBR
1.5 1.5
1 235
292
433
62 178
350
.04
.06*
.22
4800
1600
.11*
.271600 66 58
WBL
WBT
WBR
2 0
2 3200
0 3200
124
0 120
202
0 158
.06 WBL
WBT
WBR
1.5 1.5
1 113
430
27 .07
.13*
.02
204
180
26 4800
1600
.08*
.02.05
Right Turn Adjustment Multi
TOTAL CAPACITY UTILIZATION
.07* Multi
.47
.06*
.55
Right Turn Adjustment EBR .16* EBR .16*
Note: Assumes E/W Split Phasing
TOTAL CAPACITY UTILIZATION .90 .77
Friday, December 14, 2018 Page 39
City Council
21 –
89 4/16/2024
176 . Fairchild Av. at MacArthur Bl.
ITAM 18 Alt 2 (NEWPORT BEACH ISEC)
AM PK HOUR
178 . MacArthur Bl. at Bison Av.
ITAM 18 Alt 2 (NEWPORT BEACH ISEC)
AM PK HOURPM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C LANES CAPACITY VOL V/C VOL V/C NBL
NBT
NBR
0 0
0 0
0 0
0 0
0 0
0 0
NBL
NBT
NBR
2 4
1 3200
6400
1600
225
2801
194
.07 184 .06*
.40
.13
.44* 2529
.12 209
SBL
SBT
SBR
1 0
1 1600
0 1600
45 0
26 .03*
.02
511
0 210
.32*
.13
SBL
SBT
SBR
2 4
1 3200
6400
1600
80 2267
225
.03*
.35
.14
167
2723
276
.05
.43*
.17
EBL
EBT
EBR
1 3
0 1600
4800
0 264
1145
0 .17*
.24
41 2759
0 .03
.57*
EBL
EBT
EBR
2 2
f
3200
3200
253
237
260
.08
.07*
245
214
202
.08
.07*
WBL
WBT
WBR
0 3
0 0
4800
0 0
2404
646
1 WBL
WBT
WBR
2 2
1 3200
3200
1600
451
244
134
.14*
.08
355
250
166
.11*
.08.64* 1110
139
.26
.89
.08 .10
TOTAL CAPACITY UTILIZATION .84 TOTAL CAPACITY UTILIZATION .68 .67 179 . MacArthur Bl. at Ford Rd. 194 . MacArthur Blvd. SB at University Dr.
ITAM 18 Alt 2 (NEWPORT BEACH ISEC)ITAM 18 Alt 2 (NEWPORT BEACH ISEC)
AM PK HOUR PM PK HOUR AM PK HOUR PM PK HOUR
VOLLANES CAPACITY VOL V/C VOL V/C LANES CAPACITY VOL V/C V/C NBL
NBT
NBR
2 4
f
3200
6400
46 1895
99 .01
.30* 2128
732
61 .02
.33*
NBL
NBT
NBR
1 0
1 1600
0 1600
21 0
449
.01*
.28
30 0
553
.02*
.35
SBL
SBT
SBR
3 4
f
4800
6400
587
2455
29 .12*
.38
877
2261
71 .18*
.35
SBL
SBT
SBR
0 0
0 0
0 0
0 0
0 0
0 0
EBL
EBT
EBR
2 2
1 3200
3200
1600
49 294
59 .02
.09*
.04
35 333
62 .01
.10*
.04
EBL
EBT
EBR
0 3
0 0
4800
0 1
1711
78 0
.37* 1117
29 .24*
WBL
WBT
WBR
2 2
f
3200
3200
486
325
1025
.15*
.10
216
283
750
.07*
.09
WBL
WBT
WBR
2 3
0 3200
4800
0 352
739
0 .11*
.15
301
710
0 .09*
.15
Right Turn Adjustment NBR .27*
.76
NBR .33*
.68
TOTAL CAPACITY UTILIZATION .66 .68
TOTAL CAPACITY UTILIZATION
Friday, December 14, 2018 Page 40
City Council
21 –
90 4/16/2024
195 . SR-73 SB Ramps at University Dr.
ITAM 18 Alt 2 (NEWPORT BEACH ISEC)
AM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C
NBL
NBT
NBR
0 0
0 0
0 0
0 0
0 0
0 0
SBL
SBT
SBR
1 0
1 1600
0 1600
1067
0 123
.67*
.08
659
0 161
.41*
.10
EBL
EBT
EBR
0 3
0 0
4800
0 0
690
0 1
451
0 .14 .09
WBL
WBT
WBR
0 3
0 0
4800
0 0
770
0 2
759
0 .16*
.83
.16*
.57TOTAL CAPACITY UTILIZATION
Friday, December 14, 2018 Page 41
City Council
21 –
91 4/16/2024
733 . Irvine Av. at Mesa Dr.
ITAM 18 Alt 2 (NEWPORT BEACH ISEC)
AM PK HOUR
734 . Irvine Av. at University Dr.
ITAM 18 Alt 2 (NEWPORT BEACH ISEC)
AM PK HOURPM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C LANES CAPACITY VOL V/C VOL V/C NBL
NBT
NBR
1 3
1 1600
4800
1600
113
1597
610
.07
.33*
.38
52 689
317
.03*
.14
.13
NBL
NBT
NBR
1 3
1 1600
4800
1600
133
1740
50 .08
.36*
.03
139
675
21 .09*
.14
.01
SBL
SBT
SBR
1 3
1 1600
4800
1600
22 810
121
.01*
.17
.08
19 1826
373
.01
.38*
.23
SBL
SBT
SBR
1 3
1 1600
4800
1600
124
641
249
.08*
.13
.16
54 1969
637
.03
.41*
.40
EBL
EBT
EBR
1 1.5
1 1600
4000
212
408
86 .13
.25*
48 164
142
.03
.10*
.09
EBL
EBT
EBR
1.5 0.5
1 533 {.21}* 273 {.11}*
3200
1600
136
173
.21
.11
84 .11
.12194
WBL
WBT
WBR
2 1
0 3200
1600
0 274
76 11
.09*
.05
721
335
24 .23*
.22
WBL
WBT
WBR
1 1
d
1600
1600
1600
15 48
27 .01
.03*
.02
51 226
114
.03
.14*
.07
Right Turn Adjustment NBR .05*
.73
TOTAL CAPACITY UTILIZATION .68 .75
TOTAL CAPACITY UTILIZATION .74
741 . Jamboree Av. at San Joaquin Hills Rd.
ITAM 18 Alt 2 (NEWPORT BEACH ISEC)
742 . MacArthur Blvd. at San Joaquin Hills Rd.
ITAM 18 Alt 2 (NEWPORT BEACH ISEC)
AM PK HOUR PM PK HOUR AM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C LANES CAPACITY VOL V/C VOL V/C NBL
NBT
NBR
1 3
f
1600
4800
55 1231
237
.03
.26* 1233
123
74 .05
.26*
NBL
NBT
NBR
2 4
0 3200
6400
0 103
1220
6 .03
.19* 1604
19 56 .02
.25*
SBL
SBT
SBR
2 3
f
3200
4800
766
1350
92 .24*
.28
543
1581
266
.17*
.33
SBL
SBT
SBR
2 3
f
3200
4800
538
1487
906
.17*
.31
616
1496
418
.19*
.31
EBL
EBT
EBR
1.5 1.5
f
262
73 63
.08*
.05
119
48 63
.04*
.03
EBL
EBT
EBR
3 3
0 4800
4800
0 102
267
71 .02*
.07
880
457
112
.18*
.124800
WBL
WBT
WBR
2 1
1 3200
1600
1600
134
23 23
.04*
.01
.01
285
99 66
.09*
.06
.04
WBL
WBT
WBR
1 2
f
1600
3200
23 410
766
.01
.13*
48 333
429
.03
.10*
Note: Assumes E/W Split Phasing
TOTAL CAPACITY UTILIZATION
TOTAL CAPACITY UTILIZATION .51 .72
.62 .56
Friday, December 14, 2018 Page 42
City Council
21 –
92 4/16/2024
4 . SR-55 SB Ramps at Edinger Av. 5 . Hotel Terrace Dr. at Dyer Rd.
ITAM 18 Alt 2 (SANTA ANA ISEC) ITAM 18 Alt 2 (SANTA ANA ISEC)
AM PK HOUR PM PK HOUR AM PK HOUR PM PK HOUR
LANES CAPACITY
1.5 VOL V/C VOL V/C LANES CAPACITY
1.5 VOL V/C VOL V/C
NBL
NBT
NBR
437
49 361
30 NBL
NBT
NBR
245
17 331
90.5 2
3400
3400
.14*
.19
.12*
.06
0.5 2
3400
3400
.08*
.16
.10*
.07633 189 547 230
SBL
SBT
SBR
1 1
1 1700
1700
1700
44 24
11 .03*
.01
.01
100
69 51
.06*
.04
.03
SBL
SBT
SBR
0.5 1.5
1 55
187
65 100
250
119
3400
1700
.07*
.04
.10*
.07
EBL
EBT
EBR
1 3
f
1700
5100
27 2197
450
.02
.43* 1704
431
50 .03
.33*
EBL
EBT
EBR
1 3
1 1700
5100
1700
37 1499
349
.02 82 .05
.29*
.13
.29* 1492
.21 226
WBL
WBT
WBR
2 3
0 3400
5100
0 540
1561
124
.16*
.33
436
1987
123
.13*
.41
WBL
WBT
WBR
2 3
1 3400
5100
1700
414
810
97 .12*
.16
.06
779
1361
70 .23*
.27
.04
Clearance Interval .05*
.81
.05*
.69
Clearance Interval .05*
.61
.05*
.77
Note: Assumes N/S Split Phasing Note: Assumes N/S Split Phasing
TOTAL CAPACITY UTILIZATION TOTAL CAPACITY UTILIZATION
6 . Grand Av. at Dyer Rd. 7 . SR-55 NB Ramps at Dyer Rd.
ITAM 18 Alt 2 (SANTA ANA ISEC)
AM PK HOUR
ITAM 18 Alt 2 (SANTA ANA ISEC)
AM PK HOUR PM PK HOUR PM PK HOUR
LANES CAPACITY VOL V/C VOL V/C LANES CAPACITY VOL V/C VOL V/C NBL
NBT
NBR
0 0
0 0
0 0
0 0
0 0
0 0
NBL
NBT
NBR
1.5 730 {.28}* 212
0 .06*
0 5100 0 .28
1.5 715 263 {.00}
SBL
SBT
SBR
2 0
1 3400
0 1700
1266
0 361
.37*
.21
497
0 464
.15*
.27
SBL
SBT
SBR
0 0
0 0
0 0
0 0
0 0
0 0
EBL
EBT
EBR
2 3
0 3400
5100
0 145
2010
0 .04
.39* 1441
0 334 .10*
.28
EBL
EBT
EBR
0 3
f
0 5100
0 2635
640
0 .52* 1397
680
.27
WBL
WBT
WBR
0 3
f
0 5100
0 882
877
0 1765
670
WBL
WBT
WBR
0 2.5
1.5 0
6800
0 0
.17 .35* 1050 {.21}
430 {.04}
2178 {.48}*
1190
Right Turn Adjustment
Clearance Interval
SBR .04*
.05*
Clearance Interval
TOTAL CAPACITY UTILIZATION
.05* .05*
.59
.05*
.81
.85
TOTAL CAPACITY UTILIZATION
Friday, December 14, 2018
.69