The City has advanced these goals through several transportation safety planning efforts, including the Safe Mobility Santa Ana (SMSA) Plan adopted in 2016 and Active Transportation Plan adopted in 2019. In 2020, the City adopted the Santa Ana Safe Routes to School (SRTS) Plan, developed through a multi-agency partnership to promote walking and bicycling as safe and healthy transportation options for students traveling to and from school. In 2024, the City adopted its Vision Zero Action Plan, which updated the SMSA Plan and identified strategies to address serious collisions and improve safety for the City’s most vulnerable roadway users.
The City owns, operates, and maintains 50 parks and recreational facilities, consisting of:
• City Parks (6)
• Community Parks (17)
• Neighborhood Parks (12)
• Pocket Parks (8)
• Urban Plazas (3)
• Special Use Facilities (4)
While roadways adjacent to certain parks and schools have been evaluated through the Vision Zero Action Plan and Safe Routes to School Plan, the majority of routes providing access to the City’s 50 parks and recreational facilities have not been comprehensively studied. This planning gap identified the need for a Safe Routes to Parks and Wheelchair Assessment Plan to evaluate existing conditions, identify accessibility and safety deficiencies, and develop recommended improvements that build upon the City’s previous transportation planning efforts. The wheelchair assessment will further evaluate pedestrian accessibility along routes serving City parks, including sidewalks, curb ramps, crossings, and other potential barriers to mobility. The proposed Safe Routes to Parks and Wheelchair Assessment Plan will complement, rather than duplicate, these existing planning efforts by focusing specifically on safe and accessible routes to City parks and identifying mobility barriers for persons with disabilities.
The project will evaluate pedestrian and bicycle access to the City's 50 parks and recreational facilities, with a focus on routes within one-quarter mile of each park. Based on the City's existing pedestrian network, the combined park study areas encompass an estimated 250 miles of sidewalk before accounting for overlapping study areas. The wheelchair assessment will build upon the City's existing citywide inventory of approximately 7,400 curb-ramp locations and will update curb-ramp conditions, with park-area ramps receiving focused field review and other locations evaluated through a combination of desktop review and targeted field verification.
The City applied for and was awarded a Planning and Demonstration grant through the U.S. Department of Transportation (DOT) Federal Highway Administration (FHWA) Fiscal Year 2023 Safe Streets and Roads for All (SS4A) Grant program. The SS4A City Council 16 – 2 9/15/2026
Award of an Agreement for the Safe Routes to Parks and Wheelchair Assessment Plan September 15, 2026
Program supports the planning, infrastructure, behavioral, and operational initiatives to prevent roadway deaths and serious injuries among all roadway users, including pedestrians, bicyclists, transit and micromobility users, and commercial vehicle operators.
Due to federal staffing constraints and a high volume of grant agreements, U.S. DOT experienced significant processing delays for Fiscal Year 2023 awards. During the processing period, U.S. DOT required revisions to its standard grant agreements and provided the City with an updated agreement template on November 3, 2025. To mitigate delays in processing, the grant provides a five-year period of performance from the award date, with eligible grant expenditures required to be completed by September 30, 2028.
On December 2, 2025, City Council recognized $651,200 in Federal SS4A grant funding. Pursuant to the executed agreement with U.S. DOT, the City will contribute $162,654 local matching funds, resulting in a project budget of $813,854.
The Safe Routes to Parks and Wheelchair Assessment Plan will evaluate pedestrian and bicycle access to City parks, identify existing safety and accessibility barriers, engage community stakeholders, and develop prioritized recommendations for future infrastructure improvements. The Plan will provide the City with an implementation framework to guide future capital projects and support applications for competitive grant funding.
The Safe Routes to Parks and Wheelchair Assessment Plan is intended to serve as an implementation and funding framework for future pedestrian, bicycle, and accessibility improvements throughout the City. The City will leverage the approach used for its Safe Routes to School Plan, which has provided a foundation for identifying, prioritizing, developing, and pursuing funding for improvements around schools. To date, the City has successfully secured over $100 million in grant funding for Safe Routes to School and related active transportation improvements, including funding through the Active Transportation Program (ATP) and other competitive funding sources.
Similarly, the Safe Routes to Parks Plan will identify specific infrastructure needs and recommended improvements; establish priorities based on safety accessibility, equity, community needs, and feasibility; and develop planning-level cost estimates and GIS mapping necessary to advance projects for future funding applications. The Plan will also identify appropriate federal, state, regional, and local funding opportunities and establish a prioritized list of projects that can be pursued as funding opportunities become available. This approach will allow the City to move from planning to implementation by using the completed Plan as a foundation for developing grant applications, capital improvement projects, and future design and construction efforts.
City Council 16 – 3 9/15/2026
Award of an Agreement for the Safe Routes to Parks and Wheelchair Assessment Plan September 15, 2026
By establishing a citywide, data-driven, community-supported list of prioritized Safe Routes to Parks projects, the City will be better positioned to compete for discretionary funding programs such as the Active Transportation Program, Highway Safety Improvement Program, Safe Streets and Roads for All, and other Federal, State, and regional funding sources. The Plan will also identify opportunities to coordinate park access improvements with roadway, sidewalk, bicycle, transit, and accessibility projects already planned or programmed by the City and partner agencies.
This approach is consistent with the City's existing Safe Routes to School implementation model and is intended to create a repeatable pipeline of grant-ready projects that can be pursued over multiple funding cycles.
Request for Proposal (RFP) No. 26-028A was issued February 26, 2026 on the City’s online bid management and publication system. A summary of vendor participation and results is as follows:
546
0 45
5 0
Vendors notified
Santa Ana vendors notified
Vendors downloaded the RFP packet
Responsive proposals received
Responsive proposals received from Santa Ana vendors
Proposals were solicited, opened on March 30, 2026, and evaluated. Five proposals were submitted by the RFP deadline and were determined to be responsive to the specifications and met the City’s requirements. An evaluation committee reviewed and rated the proposals according to the criteria listed in the RFP. The following summarizes the rankings of all responding firms:
Firm City Ranking
KTU&A San Diego, CA 1
Toole Design Group Los Angeles, CA 2
Alta Planning & Design Los Angeles, CA 3
Mark Thomas Irvine, CA 4
HDR Engineering, Inc. Irvine, CA 5
Based on a comprehensive evaluation of the proposals, the evaluation committee determined that KTU&A demonstrated the best overall understanding of the City's vision for the Safe Routes to Parks and Wheelchair Assessment Plan and is uniquely qualified to deliver a community-centered planning process tailored to Santa Ana. KTU&A's proposal reflects extensive experience preparing multimodal transportation, active transportation, and community planning projects for California public agencies, with particular emphasis on integrating transportation planning, urban design, accessibility, and placemaking. The proposed project team demonstrated a strong understanding of Santa Ana's existing planning efforts, including the Vision Zero Action Plan, Safe City Council 16 – 4 9/15/2026
Award of an Agreement for the Safe Routes to Parks and Wheelchair Assessment Plan September 15, 2026
Routes to School Plan, and Sidewalk Connectivity Plan, and presented an approach that builds upon these efforts while focusing on implementation-ready recommendations that improve access to parks for residents of all ages and abilities.
The evaluation committee highly ranked KTU&A's collaborative and multidisciplinary approach, which emphasizes meaningful community engagement, coordination with local stakeholders, and context-sensitive solutions that reflect the unique character and needs of Santa Ana's neighborhoods. KTU&A's experience working within Southern California communities, combined with its understanding of equitable transportation planning and public realm design, positions the firm to successfully develop a plan that not only identifies infrastructure improvements, but also creates a practical roadmap for future capital investment and competitive grant funding opportunities. Based on the proposal, interview, and overall evaluation, the committee determined that KTU&A offers the best overall value and project approach to successfully complete the Safe Routes to Parks and Wheelchair Assessment Plan in accordance with the City's objectives.
Staff recommends awarding an agreement to the highest-ranked firm, KTU&A (Exhibit 1), based on evaluations of both the proposal (Exhibit 2) and interview performance.
KTU&A demonstrated the ability to allocate the necessary staffing and resources to complete the project within the timeline allotted by the grant funding source.
ENVIRONMENTAL IMPACT
There is no environmental impact associated with this action.
FISCAL IMPACT
With the approval of the requested appropriation adjustment, a portion of the accumulated fund balance will be appropriated for spending in the Measure M2 Local Fairshare St., Improvements Other Than Buildings expenditure account (No. 03217662- 66220). The spendable portion of the fund balance is estimated at $1,862,161.31 as of June 30, 2027, which is sufficient to allow for the recommended appropriation of $83,486. Any remaining balances not expended at the end of the fiscal year will be presented to City Council for approval of carryovers into Fiscal Year 2027-2028. (Exhibit 3).
Funding will be budgeted and made available in the following account for the specified year, subject to City Council approval:
City Council 16 – 5 9/15/2026
Award of an Agreement for the Safe Routes to Parks and Wheelchair Assessment Plan September 15, 2026
Fiscal
Year
Accounting
Unit – Account
No.
(Project No.)
Fund
Description
Accounting Unit,
Account Description Amount
APPROPRIATION ADJUSTMENT
2026-27 03217662-
66220 (26-6100)
Measure MStreet
Construction
Measure M2 Local
Fairshare St,
Improvements Other
Than Buildings
$83,486
CURRENT BUDGET
2026-27
14717611-
66220
(26-6100)
Street Safety
Programs
Pub SVS-Street Safety
Projects, Improvements
Other Than Buildings
$651,200
2026-27
03217662-
66220
(26-6100)
Measure MStreet
Construction
Measure M2 Local
Fairshare St,
Improvements Other
Than Buildings
$79,168
TOTAL $813,854
EXHIBIT(S)
1. Agreement with KTU&A
2. KTU&A Proposal
3. Capital Improvement Project Worksheet
Submitted By: Rodolfo Rosas, P.E., Acting Executive Director of Public Works Approved By: Alvaro Nuñez, City Manager
City Council 16 – 6 9/15/2026
AGREEMENT WITH KTU&A TO PROVIDE TRANSPORTATION
PLANNING AND TRAFFIC ENGINEERING SERVICES
THIS AGREEMENT is made and entered into on this 15th day of September, 2026 by and between KTU&A (“Consultant”), and the City of Santa Ana, a charter city and municipal corporation organized and existing under the Constitution and laws of the State of California (“City”).
RECITALS
A. On February 26, 2026, the City issued Request for Proposals (“RFP”) No. 26-028A, by which it sought a Consultant to perform transportation planning and traffic engineering services for the Safe Routes to Parks and Wheelchair Assessment Plan.
B. Consultant submitted a responsive proposal that was selected by the City. Consultant represents that it is able and willing to provide the services described in the scope of work that was included in RFP 26-028A.
C. In undertaking the performance of this Agreement, Consultant represents that it is knowledgeable in its field and that any services performed by Consultant under this Agreement will be performed in compliance with such standards as may reasonably be expected from a professional consulting firm in the field.
NOW THEREFORE, in consideration of the mutual and respective promises, and subject to the terms and conditions hereinafter set forth, the parties agree as follows:
1. SCOPE OF SERVICES
Consultant shall perform during the term of this Agreement, the tasks and obligations including all labor, materials, tools, equipment, and incidental customary work required to fully and adequately complete the services described and set forth in Exhibit A, attached hereto and incorporated by reference.
COMPENSATION
City agrees to pay, and Consultant agrees to accept as total payment for its services for City, the rates and charges identified in Exhibit B. The total amount to be expended during the term of this Agreement shall not exceed $813,854 . Payment by City shall be made within forty-five (45) days following receipt of proper invoice evidencing work performed, subject to City accounting procedures. City and Consultant agree that all payments due and owing under this Agreement shall be made through Automated Clearing House (ACH) transfers. Consultant agrees to execute the City’s standard ACH Vendor Payment Authorization and provide required documentation. Upon verification of the data provided, the City will be authorized to deposit payments directly into Consultant’s account(s) with financial institutions.
Payment need not be made for work which fails to meet the standards of performance set forth in the Recitals which may reasonably be expected by City.
City Council 16 – 7 9/15/2026
3. TERM
This Agreement shall commence on the date first written above for a one (1) year term with the option for the City to grant up to two (2), one (1)-year extension(s), exercisable by a writing by the City Manager and the City Attorney, unless terminated earlier in accordance with Section 16, below.
4. PREVAILING WAGES
Consultant is aware of the requirements of California Labor Code Section 1720, et seq., and 1770, et seq., as well as California Code of Regulations, Title 8, Section 16000, et seq., (“Prevailing Wage Laws”), which require the payment of prevailing wage rates and the performance of other requirements on “public works” and “maintenance” projects. If the services being performed are part of an applicable “public works” or “maintenance” project, as defined by the Prevailing Wage Laws, and the total compensation is $1,000 or more, Consultant agrees to fully comply with such Prevailing Wage Laws. Consultant shall defend, indemnify and hold the City, its elected officials, officers, employees and agents free and harmless from any claim or liability arising out of any failure or alleged failure to comply with the Prevailing Wage Laws.
5. INDEPENDENT CONTRACTOR
Consultant shall, during the entire term of this Agreement, be construed to be an independent contractor and not an employee of the City. This Agreement is not intended nor shall it be construed to create an employer-employee relationship, a joint venture relationship, or to allow the City to exercise discretion or control over the professional manner in which Consultant performs the services which are the subject matter of this Agreement; however, the services to be provided by Consultant shall be provided in a manner consistent with all applicable standards and regulations governing such services. Consultant shall pay all salaries and wages, employer's social security taxes, unemployment insurance and similar taxes relating to employees and shall be responsible for all applicable withholding taxes.
6. OWNERSHIP OF MATERIALS
This Agreement creates a non-exclusive and perpetual license for City to copy, use, modify, reuse, or sublicense any and all copyrights, designs, and other intellectual property embodied in plans, specifications, studies, drawings, estimates, and other documents or works of authorship fixed in any tangible medium of expression, including but not limited to, physical drawings or data magnetically or otherwise recorded on computer diskettes, which are prepared or caused to be prepared by Consultant under this Agreement (“Documents & Data”). Consultant shall require all subcontractors to agree in writing that City is granted a non-exclusive and perpetual license for any Documents & Data the subcontractor prepares under this Agreement.
Consultant represents and warrants that Consultant has the legal right to license any and all Documents & Data. Consultant makes no such representation and warranty in regard to Documents & Data which were provided to Consultant by the City. City shall not be limited in City Council 16 – 8 9/15/2026
any way in its use of the Documents and Data at any time, provided that any such use not within the purposes intended by this Agreement shall be at City’s sole risk.
7. INSURANCE
Insurance requirements attached hereto as Exhibit C and incorporated by reference.
8. INDEMNIFICATION
Consultant agrees to defend, and shall indemnify and hold harmless the City, its officers, agents, employees, contractors, special counsel, and representatives from liability: (1) for personal injury, damages, just compensation, restitution, judicial or equitable relief arising out of claims for personal injury, including death, and claims for property damage, which may arise from the negligent operations of the Consultant, its subcontractors, agents, employees, or other persons acting on its behalf which relates to the services described in section 1 of this Agreement; and (2) from any claim that personal injury, damages, just compensation, restitution, judicial or equitable relief is due by reason of the terms of or effects arising from this Agreement. This indemnity and hold harmless agreement applies to all claims for damages, just compensation, restitution, judicial or equitable relief suffered, or alleged to have been suffered, by reason of the events referred to in this Section or by reason of the terms of, or effects, arising from this Agreement. The Consultant further agrees to indemnify, hold harmless, and pay all costs for the defense of the City, including fees and costs for special counsel to be selected by the City, regarding any action by a third party challenging the validity of this Agreement, or asserting that personal injury, damages, just compensation, restitution, judicial or equitable relief due to personal or property rights arises by reason of the terms of, or effects arising from this Agreement. City may make all reasonable decisions with respect to its representation in any legal proceeding. Notwithstanding the foregoing, to the extent Consultant’s services are subject to Civil Code Section 2782.8, the above indemnity shall be limited, to the extent required by Civil Code Section 2782.8, to claims that arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of the Consultant.
9. INTELLECTUAL PROPERTY INDEMNIFICATION
Consultant shall defend and indemnify the City, its officers, agents, representatives, and employees against any and all liability, including costs, for infringement of any United States’ letters patent, trademark, or copyright infringement, including costs, contained in the work product or documents provided by Consultant to the City pursuant to this Agreement.
10. RECORDS
Consultant shall keep records and invoices in connection with the work to be performed under this Agreement. Consultant shall maintain complete and accurate records with respect to the costs incurred under this Agreement and any services, expenditures, and disbursements charged to the City for a minimum period of three (3) years, or for any longer period required by law, from the date of final payment to Consultant under this Agreement. All such records and invoices shall be clearly identifiable. Consultant shall allow a representative of the City to examine, audit, and make transcripts or copies of such records and any other documents created City Council 16 – 9 9/15/2026
pursuant to this Agreement during regular business hours. Consultant shall allow inspection of all work, data, documents, proceedings, and activities related to this Agreement for a period of three (3) years from the date of final payment to Consultant under this Agreement.
11. CONFIDENTIALITY
If Consultant receives from the City information which due to the nature of such information is reasonably understood to be confidential and/or proprietary, Consultant agrees that it shall not use or disclose such information except in the performance of this Agreement, and further agrees to exercise the same degree of care it uses to protect its own information of like importance, but in no event less than reasonable care. “Confidential Information” shall include all nonpublic information. Confidential information includes not only written information, but also information transferred orally, visually, electronically, or by other means. Confidential information disclosed to either party by any subsidiary and/or agent of the other party is covered by this Agreement. The foregoing obligations of non-use and nondisclosure shall not apply to any information that (a) has been disclosed in publicly available sources; (b) is, through no fault of the Consultant disclosed in a publicly available source; (c) is in rightful possession of the Consultant without an obligation of confidentiality; (d) is required to be disclosed by operation of law; or (e) is independently developed by the Consultant without reference to information disclosed by the City.
12. CONFLICT OF INTEREST CLAUSE
a. The recipient or subrecipient must maintain written standards of conduct covering conflicts of interest and governing the actions of its employees engaged in the selection, award, and administration of contracts. No employee, officer, agent, or board member with a real or apparent conflict of interest may participate in the selection, award, or administration of a contract supported by the Federal award. A conflict of interest includes when the employee, officer, agent, or board member, any member of their immediate family, their partner, or an organization that employs or is about to employ any of the parties indicated herein, has a financial or other interest in or a tangible personal benefit from an entity considered for a contract. An employee, officer, agent, and board member of the recipient or subrecipient may neither solicit nor accept gratuities, favors, or anything of monetary value from contractors. However, the recipient or subrecipient may set standards for situations where the financial interest is not substantial or a gift is an unsolicited item of nominal value. The recipient's or subrecipient's standards of conduct must also provide for disciplinary actions to be applied for violations by its employees, officers, agents, or board members. b. If the recipient or subrecipient has a parent, affiliate, or subsidiary organization that is not a State, local government, or Indian Tribe, the recipient or subrecipient must also maintain written standards of conduct covering organizational conflicts of interest.
Organizational conflicts of interest mean that because of relationships with a parent company, affiliate, or subsidiary organization, the recipient or subrecipient is unable or appears to be unable to be impartial in conducting a procurement action involving a City Council 16 – 10 9/15/2026
related organization.
c. Consultant covenants that it presently has no interests and shall not have interests, direct or indirect, which would conflict in any manner with performance of services specified under this Agreement.
d. No immediate family members of either the Mayor, City Council Member, or any appointed City Official, including appointed board and commission members, as defined under the City’s Municipal Code, whose position with the City shall award or influence the award of this Agreement, or any competing contract or amendment thereof, shall be employed in any capacity by the Consultant or have any other direct or indirect financial benefit or interest in this Agreement. e. The section also prohibits the awarding of any agreement, contract, grant, or any amendment to those awards, to any former full-time employee for one-year from date of employee separation except for any CalPERS retiree as authorized by City Council resolution
f. The Consultant must comply with all conflict of interest laws, ordinances, and regulations now in effect or hereafter to be enacted during the term of this Agreement.
The Consultant warrants that it is not now aware of any facts which conflict with the prohibitions defined above. If the Consultant hereafter becomes aware of any facts that might reasonably be expected to create a conflict of interest, it must immediately make full written disclosure of such facts to the City. Full written disclosure must include, but is not limited to, identification of all persons implicated and a complete description of all relevant circumstances. Failure to comply with the provisions of this paragraph will be a material breach of this Agreement.
g. Consultant covenants that none of its directors, officers, employees, or agents shall participate in selecting or administrating any subcontract supported (in whole or in part) by City funds stemming from the Agreement where the awarding of the subcontract has any direct or indirect financial benefit or interest to any individual, as defined in subsections (d) and (e) above.
13. NON-DISCRIMINATION
Consultant shall not discriminate because of race, color, creed, religion, sex, marital status, sexual orientation, gender identity, gender expression, gender, medical conditions, genetic information, or military and veteran status, age, national origin, ancestry, or disability, as defined and prohibited by applicable law, in the recruitment, selection, teaching, training, utilization, promotion, termination or other employment related activities or any services provided under this Agreement. Consultant affirms that it is an equal opportunity employer and shall comply with all applicable federal, state and local laws and regulations.
City Council 16 – 11 9/15/2026
14. EXCLUSIVITY AND AMENDMENT
This Agreement represents the complete and exclusive statement between the City and Consultant, and supersedes any and all other agreements, oral or written, between the parties. In the event of a conflict between the terms of this Agreement and any attachments hereto, the terms of this Agreement shall prevail. This Agreement may not be modified except by written instrument signed by the City and by an authorized representative of Consultant. The parties agree that any terms or conditions of any purchase order or other instrument that are inconsistent with, or in addition to, the terms and conditions hereof, shall not bind or obligate Consultant or the City. Each party to this Agreement acknowledges that no representations, inducements, promises or agreements, orally or otherwise, have been made by any party, or anyone acting on behalf of any party, which is not embodied herein.
15. ASSIGNMENT
Inasmuch as this Agreement is intended to secure the specialized services of Consultant, Consultant may not assign, transfer, delegate, or subcontract any interest herein without the prior written consent of the City and any such assignment, transfer, delegation or subcontract without the City's prior written consent shall be considered null and void. Nothing in this Agreement shall be construed to limit the City’s ability to have any of the services which are the subject to this Agreement performed by City personnel or by other Contractors retained by City.
16. TERMINATION
This Agreement may be terminated by the City upon thirty (30) days written notice of termination. In such event, Consultant shall be entitled to receive and the City shall pay Consultant compensation for all services performed by Consultant prior to receipt of such notice of termination, subject to the following conditions:
a. As a condition of such payment, the Executive Director may require Consultant to deliver to the City all work product(s) completed as of such date, and in such case such work product shall be the property of the City unless prohibited by law, and Consultant consents to the City's use thereof for such purposes as the City deems appropriate.
b. Payment need not be made for work which fails to meet the standard of performance specified in the Recitals of this Agreement.
17. WAIVER
No waiver of breach, failure of any condition, or any right or remedy contained in or granted by the provisions of this Agreement shall be effective unless it is in writing and signed by the party waiving the breach, failure, right or remedy. No waiver of any breach, failure or right, or remedy shall be deemed a waiver of any other breach, failure, right or remedy, whether or not similar, nor shall any waiver constitute a continuing waiver unless the writing so specifies.
18. JURISDICTION - VENUE
City Council 16 – 12 9/15/2026
This Agreement has been executed and delivered in the State of California and the validity, interpretation, performance, and enforcement of any of the clauses of this Agreement shall be determined and governed by the laws of the State of California. Both parties further agree that Orange County, California, shall be the venue for any action or proceeding that may be brought or arise out of, in connection with or by reason of this Agreement.
19. PROFESSIONAL LICENSES
Consultant shall, throughout the term of this Agreement, maintain all necessary licenses, permits, approvals, waivers, and exemptions necessary for the provision of the services hereunder and required by the laws and regulations of the United States, the State of California, the City of Santa Ana and all other governmental agencies. Consultant shall notify the City immediately and in writing of its inability to obtain or maintain such permits, licenses, approvals, waivers, and exemptions. Said inability shall be cause for termination of this Agreement.
20. FEDERAL REGULATIONS
KTU&A shall comply with all applicable contractual provisions required by the United States Office of Management and Budget (OMB), as set for the in 2 CRF Part 200, whether or not expressly set forth in this document, including but not limited to those provisions set forth below. Notwithstanding, anything to the contrary herein, including without limitation , the language in this Agreement, the actual language contained in federal statutes, federal regulations, federally promulgated materials and state statutes, shall control in determining any obligations under federal law in the event of a conflict with any terms, language or provisions contained in this Agreement. KTU&A shall not perform any act, fail to perform any act, or refuse to comply with any requests, which would cause City to be in violation of the federal terms and conditions.
a. Federal Regulations – Recipient must comply with the government cost principles, uniform administrative requirements and audit requirements for federal grant program housed within Title 2, Part 180 of the Code of Federal Regulations.
b. Debarment and Suspension – As required by Executive Orders 12549 and 12689, and 2 CFR §200.214 and codified in 2 CFR Part 200, Recipient must provide protection against waste, fraud, and abuse by debarring or suspending those persons deemed irresponsible in their dealings with the Federal government.
c. Audit Records – With respect to all matters covered by this agreement all records shall be made available for audit and inspection by CITY, the grant agency and/or their duly authorized representatives for a period of three (3) years from the date of submission of the final expenditure report by the City of Santa Ana. For a period of three years after final delivery hereunder or until all claims related to this Agreement are finally settled, whichever is later, Recipient shall preserve and maintain all documents, papers and records relevant to the services provided in accordance with this Agreement, including the Attachments hereto. For the same time period, Recipient shall make said documents, papers and records available to City and the agency from which City City Council 16 – 13 9/15/2026
received grant funds or their duly authorized representative(s), for examination, copying, or mechanical reproduction on or off the premises of Recipient, upon request during usual working hours.
d. Reports – Recipient shall provide to City all records and information requested by City for inclusion in quarterly reports and such other reports or records as City may be required to provide to the agency from which City received grant funds or other persons or agencies. e. Section 504 of the Rehabilitation Act of 1973 (Handicapped) – All recipients of federal funds must comply with Section 504 of the Rehabilitation Act of 1973 (The Act). Therefore, the federal funds recipient pursuant to the requirements of The Act hereby gives assurance that no otherwise qualified handicapped person shall, solely by reason of handicap be excluded from the participation in, be denied the benefits of or be subject to discrimination, including discrimination in employment, in any program or activity that receives or benefits from federal financial assistance. The Recipient agrees it will ensure that requirements of The Act shall be included in the agreements with and be binding on all of its contractors, subcontractors, assignees or successors.
f. Americans with Disabilities Act of 1990 – (ADA) Recipient must comply with all requirements of the Americans with Disabilities Act of 1990 (ADA), as applicable. g. Political Activity – None of the funds, materials, property, or services provided directly or indirectly under this agreement shall be used for any partisan political activity, or to further the election or defeat of any candidate for public office, or otherwise in violation of the provisions of the "Hatch Act".
h. No Lobbying – Recipient will comply with all applicable lobbying prohibitions and laws, including those found in the Byrd Anti-Lobbying Amendment (31 U.S.C. 1352, et seq.), and agrees that none of the funds provided under this award may be expended by the Recipient to pay any person to influence, or attempt to influence an officer or employee of any agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with any federal action concerning the award or renewal of any federal contract, grant, loan, or cooperative agreement.
i. Non-Discrimination and Equal Opportunity – Recipient will comply, and all its contractors (or subrecipients) will comply, with Title VI of the Civil Rights Act of 1964, as amended; Section 504 of the Rehabilitation Act of 1964, as amended; Subtitle A, Title II of the Americans with Disabilities Act (ADA) (1990); Title IX of the Education Amendments of 1972; the Age Discrimination Act of 1975, as amended; Drug Abuse Office and Treatment Act of 1972, as amended; Comprehensive Alcohol Abuse and Alcoholism Prevention, Treatment and Rehabilitation Act of 1970, as amended; Section 523 and 527 of the Public Health Service Act of 1912, as amended; Title VIII of the Civil Rights Act of 1968, as amended; Department of Justice Non-Discrimination Regulations, 28 CFR Part 42, Subparts C, D, E, and G; and Department of Justice regulations on disability discrimination, 28 CFR Part 35 and 39. In the event a Federal or State court, Federal or State administrative agency, or the Recipient makes a finding of discrimination after a due process hearing on the grounds of race, color, religion, national origin, City Council 16 – 14 9/15/2026
sex, or disability against a recipient of funds, the Recipient will forward a copy of the findings to CITY which will, in turn, submit the findings to the Office of Civil Rights, Office of Justice Programs, U.S. Department of Justice. If applicable, recipient will comply with the equal opportunity clause in 41 C.F.R. 60-1.4(b) in accordance with Executive Order 11246 as amended by Executive Order No. 11375.
j. Equal Employment Opportunity – Recipient will comply, and all its contractors (or subrecipients) will comply, with all requirements of the Executive Order 11246 of September 24, 1965, entitled “Equal Employment Opportunity,” as amended by Executive Order 11375 of October 13, 1967, and as supplemented in Department of Labor regulations (41 CFR chapter 60), as applicable.
k. Public Contracts Code – Recipient will comply, and all its contractors (or subrecipients) will comply, with all requirements of the California Public Contract Code Section 10295.3, as applicable.
l. Copeland “Anti-Kickback” Act – Recipient will comply, and all its contractors (or subrecipients) will comply, with all requirements of the Copeland “Anti-Kickback” Act (40 U.S.C. 3145) as supplemented in Department of Labor regulations (29 CFR Part 3), as applicable. m. Davis-Bacon Act – Recipient will comply, and all its contractors (or subrecipients) will comply, with all requirements of the Davis-Bacon Act (40 U.S.C. 3141-3144 and 3146-3148) as supplemented by Department of Labor regulations (29 CFR Part 5), as applicable. n. Work Hours and Safety – Recipient will comply, and all its contractors (or subrecipients) will comply, with all requirements of Sections 103 and 107 of the Contract Work Hours and Safety Standards Act (40 U.S.C. 3702 and 3704) as supplemented by Department of Labor regulations (29 CFR Part 5), as applicable.
o. Clean Air Act –
1. The Consultant agrees to comply with all applicable standards, orders or regulations issued pursuant to the Clean Air Act, as amended, 42 U.S.C. § 7401 et seq.
2. The Consultant agrees to report each violation to CITY and understands and agrees that the CITY will, in turn, report each violation as required to assure notification to the Federal Emergency Management Agency, and the appropriate Environmental Protection Agency Regional Office.
3. The Consultant agrees to include these requirements in each subcontract exceeding $150,000 financed in whole or in part with Federal assistance provided by FEMA. p. Energy and Conservation – Recipient will comply, and all its contractors (or subrecipients) will comply, with all requirements of the Energy Policy and Conservation Act (42 U.S.C. 6201), as applicable.
q. Waste Disposal – Recipient will comply, and all its contractors (or subrecipients) will City Council 16 – 15 9/15/2026
comply, with all requirements of Section 6002 of the Solid Waste Disposal Act, as amended by the Resource Conservation and Recovery Act, as applicable. r. Patent Rights – Recipient agrees that the Department of Homeland Security shall have the authority to seek patent rights for any process, product, invention or discovery developed and paid for with funding through this Agreement based on the requirements of 37 CFR§ 401 and any other implementing regulations, as applicable.
s. Copyright – Recipient may copyright any books, publications or other copyrightable materials developed in the course of or under this Agreement. However, the federal awarding agency, State Administrative Agency (SAA) and City reserve a royalty-free, non-exclusive, and irrevocable license to reproduce, publish or otherwise use, and to authorize others to use, for federal government, SAA and/or City purpose:
(1) the copyright in any work developed through this Agreement; and (2) any rights of copyright to which the subcontractor purchases ownership with support through this grant. The Federal government’s, SAA’s and City’s rights identified above must be conveyed to the publisher and the language of the publisher’s release form must ensure the preservation of these rights. t. Equal Employment in Construction Contracts – Pursuant to Equal Employment Opportunity requirements of 41 C.F.R. 60-1.4(b) in accordance with Executive Order 11246 as amended by Executive Order No. 11375, as to any construction contract thereunder, if applicable, during the performance of this contract, the Consultant agrees as follows:
(1) The Consultant will not discriminate against any employee or applicant for employment because of race, color, religion, sex, sexual orientation, gender identity, or national origin. The Consultant will take affirmative action to ensure that applicants are employed, and that employees are treated during employment without regard to their race, color, religion, sex, sexual orientation, gender identity, or national origin. Such action shall include, but not be limited to the following:
Employment, upgrading, demotion, or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship. The Consultant agrees to post in conspicuous places, available to employees and applicants for employment, notices to be provided setting forth the provisions of this nondiscrimination clause. (2) The Consultant will, in all solicitations or advertisements for employees placed by or on behalf of the Consultant, state that all qualified applicants will receive consideration for employment without regard to race, color, religion, sex, sexual orientation, gender identity, or national origin.
(3) The Consultant will not discharge or in any other manner discriminate against any employee or applicant for employment because such employee or applicant has City Council 16 – 16 9/15/2026
inquired about, discussed, or disclosed the compensation of the employee or applicant or another employee or applicant. This provision shall not apply to instances in which an employee who has access to the compensation information of other employees or applicants as a part of such employee's essential job functions discloses the compensation of such other employees or applicants to individuals who do not otherwise have access to such information, unless such disclosure is in response to a formal complaint or charge, in furtherance of an investigation, proceeding, hearing, or action, including an investigation conducted by the employer, or is consistent with the Consultant's legal duty to furnish information. (4) The Consultant will send to each labor union or representative of workers with which he has a collective bargaining agreement or other contract or understanding, a notice to be provided advising the said labor union or workers' representatives of the Consultant's commitments under this section, and shall post copies of the notice in conspicuous places available to employees and applicants for employment. (5) The Consultant will comply with all provisions of Executive Order 11246 of September 24, 1965, and of the rules, regulations, and relevant orders of the Secretary of Labor.
(6) The Consultant will furnish all information and reports required by Executive Order 11246 of September 24, 1965, and by rules, regulations, and orders of the Secretary of Labor, or pursuant thereto, and will permit access to his books, records, and accounts by the administering agency and the Secretary of Labor for purposes of investigation to ascertain compliance with such rules, regulations, and orders. (7) In the event of the Consultant's noncompliance with the nondiscrimination clauses of this contract or with any of the said rules, regulations, or orders, this contract may be canceled, terminated, or suspended in whole or in part and the Consultant may be declared ineligible for further Government contracts or federally assisted construction contracts in accordance with procedures authorized in Executive Order 11246 of September 24, 1965, and such other sanctions may be imposed and remedies invoked as provided in Executive Order 11246 of September 24, 1965, or by rule, regulation, or order of the Secretary of Labor, or as otherwise provided by law.
(8) The Consultant will include the portion of the sentence immediately preceding paragraph (1) and the provisions of paragraphs (1) through (8) in every subcontract or purchase order unless exempted by rules, regulations, or orders of the Secretary of Labor issued pursuant to section 204 of Executive Order 11246 of September 24, 1965, so that such provisions will be binding upon each subcontractor or vendor. The Consultant will take such action with respect to any subcontract or purchase order as the administering agency may direct as a means of enforcing such provisions, including sanctions for noncompliance.
u. Prohibition on Certain Telecommunications and Video Surveillance Services or City Council 16 – 17 9/15/2026
Equipment – Recipient will comply, and all its contractors (or subrecipients) will comply, with all requirements under Uniform Guidance 2 CFR §200.216. Recipient will comply with FEMA Policy 405-143-1, Prohibitions on Expending FEMA Award Funds on Covered Telecommunications Equipment or Services (Interim), which prohibits grant recipients and subrecipients from obligating or expending loan or grant funds to procure or obtain, extend or renew a contract to procure or obtain, or to enter into a contract (or extend or renew a contract) to procure or obtain equipment, services, or systems that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system.
As described in Public Law 115-232, section 889, covered telecommunications equipment:
(1) Telecommunications equipment produced by Huawei Technologies Company or ZTE Corporation (or any subsidiary or affiliate of such entities). (2) For the purpose of public safety, security of government facilities, physical security surveillance of critical infrastructure, and other national security purposes, video surveillance and telecommunications equipment produced by Hytera Communications Corporation, Hangzhou Hikvision Digital Technology Company, or Dahua Technology Company (or any subsidiary or affiliate of such entities).
(3) Telecommunications or video surveillance services produced by such entities or using such equipment.
(4) Telecommunications or video surveillance equipment or services produced or provided by an entity that the Secretary of Defense, in consultation with the Director of the National Intelligence or the Director of the Federal Bureau of Investigation, reasonably believes to be an entity owned or controlled by, or otherwise connected to, the government of a covered foreign country. v. Domestic Preferences for Procurements/Subcontracts – Recipient will comply, and all its contractors (or subrecipients) will comply, with all requirements under Uniform Guidance 2 CFR §200.322.
Recipient shall comply with the federal and recipient standards in the award of any subcontracts.
For purposes of this Agreement, subcontracts shall include but not be limited to purchase agreements, rental or lease agreements, third party agreements, consultant service contracts and construction subcontracts.
Recipient shall ensure that the terms of this Agreement with the CITY are incorporated into all Subcontractor Agreements. The recipient shall submit all Subcontractor Agreements to the CITY for review prior to the release of any funds to the subcontractor. The recipient shall withhold funds to any subcontractor agency that fails to comply with the terms and conditions of this Agreement and their respective Subcontractor Agreement.
(1) Recovered Materials
City Council 16 – 18 9/15/2026
Recipient shall make maximum use of products containing recovered materials that are EPA-designated items unless the product cannot be acquired competitively within a timeframe providing for compliance with the contract performance schedule; Meeting contract performance requirements; or at a reasonable price.
Information about this requirement, along with the list of EPA-designated items, is available at EPA’s Comprehensive Procurement Guidelines webpage:
https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program.
The Consultant also agrees to comply with all other applicable requirements of Section 6002 of the Solid Waste Disposal Act.
(2) Domestic Preference for Procurements
Recipient should, to the greatest extent practicable, provide a preference for the purchase, acquisition, or use of goods, products, or materials produced in the United States. This includes, but is not limited to iron, aluminum, steel, cement, and other manufactured products.
For purposes of this clause:
Produced in the United States means, for iron and steel products, that all manufacturing processes, from the initial melting stage through the application of coatings, occurred in the United States.
Manufactured products mean items and construction materials composed in whole or in part of non-ferrous metals such as aluminum; plastics and polymer-based products such as polyvinyl chloride pipe; aggregates such as concrete; glass, including optical fiber; and lumber.
w. Termination for Cause and Convenience – Should recipient fail for any reason to comply with the contractual obligations of this agreement within the time specified by this Agreement, the CITY reserves the right to terminate the Agreement, reserving all rights under state and federal law.
x. Contractual/Legal Remedies for Breach of Contract – Should recipient fail for any reason to comply with the contractual obligations of this Agreement and/or willfully, knowingly or negligently breach any term, condition or requirement of the agreement, City may impose sanctions including but not limited to damages (liquidated damages and or penalties) and /or any other remedy available pursuant to the Agreement of the laws then in effect.
21. NOTICE
Any notice, tender, demand, delivery, or other communication pursuant to this Agreement shall be in writing and shall be deemed to be properly given if delivered in person or mailed by City Council 16 – 19 9/15/2026
first class or certified mail, postage prepaid, or sent by fax or other telegraphic communication in the manner provided in this Section, to the following persons:
To City:
City Clerk
City of Santa Ana
20 Civic Center Plaza (M-30)
P.O. Box 1988
Santa Ana, California 92702-1988
With courtesy copies to:
Public Works Agency
City of Santa Ana
20 Civic Center Plaza (M-42)
P.O. Box 1988
Santa Ana, California 92702
To Consultant:
KTU&A
Attention: Joe Punsalan, Principal
1200 F Street
San Diego, California, 92101
A party may change its address by giving notice in writing to the other party. Thereafter, any communication shall be addressed and transmitted to the new address. If sent by mail, communication shall be effective or deemed to have been given three (3) days after it has been deposited in the United States mail, duly registered or certified, with postage prepaid, and addressed as set forth above. If sent by fax, communication shall be effective or deemed to have been given twenty-four (24) hours after the time set forth on the transmission report issued by the transmitting facsimile machine, addressed as set forth above. For purposes of calculating these time frames, weekends, federal, state, County or City holidays shall be excluded.
23. MISCELLANEOUS PROVISIONS
a. Each undersigned represents and warrants that its signature herein below has the power, authority and right to bind their respective parties to each of the terms of this Agreement, and shall indemnify City fully, including reasonable costs and attorney’s fees, for any injuries or damages to City in the event that such authority or power is not, in fact, held by the signatory or is withdrawn. b. All Exhibits referenced herein and attached hereto shall be incorporated as if fully set forth in the body of this Agreement.
City Council 16 – 20 9/15/2026
IN WITNESS WHEREOF, the parties hereto have executed this Agreement the date and year first above written.
ATTEST: CITY OF SANTA ANA
JENNIFER L. HALL ALVARO NUÑEZ
City Clerk City Manager
APPROVED AS TO FORM: CONSULTANT:
SONIA R. CARVALHO
City Attorney
By:
Kyle Nellesen By:
Assistant City Attorney Title:
RECOMMENDED FOR APPROVAL:
Rodolfo Rosas, P E
Acting Executive Director
Public Works Agency
Joe Punsalan
Principal
City Council 16 – 21 9/15/2026
EXHIBIT A
City Council 16 – 22 9/15/2026
City Council 16 – 23 9/15/2026
City Council 16 – 24 9/15/2026
City Council 16 – 25 9/15/2026
City Council 16 – 26 9/15/2026
City Council 16 – 27 9/15/2026
City Council 16 – 28 9/15/2026
City Council 16 – 29 9/15/2026
City Council 16 – 30 9/15/2026
City Council 16 – 31 9/15/2026
City Council 16 – 32 9/15/2026
City Council 16 – 33 9/15/2026
City Council 16 – 34 9/15/2026
EXHIBIT B
City Council 16 – 35 9/15/2026
City Council 16 – 36 9/15/2026
City Council 16 – 37 9/15/2026
City Council 16 – 38 9/15/2026
EXHIBIT C
City Council 16 – 39 9/15/2026
Prior to undertaking performance of work under this Agreement, Consultant shall maintain and shall require any subcontractors to obtain and maintain insurance as described below for the entire Term of this Agreement against claims for injuries to persons or damage to property which may arise from or in connection with services, products and materials supplied to City. Total cost of such insurance shall be borne by Consultant.
MINIMUM SCOPE AND LIMIT OF INSURANCE
1. Commercial General Liability (CGL): Insurance Services Office Form CG 00 01covering CGL on an “occurrence” basis, including products and completed operations, property damage, bodily injury and personal & advertising injury with limits no less than $2,000,000 per occurrence and $4,000,000 aggregate. Required policy limits can be met with primary and umbrella/excess insurance policies.
2. Automobile Liability (AL): Insurance Services Office Form CA 00 01 covering Code 1 (any auto), with limits no less than $1,000,000 combined single limits. In the event Consultant does not maintain commercial automobile liability insurance, City will accept evidence of personal automobile insurance, provided that such policy is endorsed for business use and provides coverage with a minimum limit of $1,000,000. Required policy limits can be met with primary and umbrella/excess insurance policies.
3. Workers’ Compensation (WC): as required by the State of California, with Statutory Limits, and Employer’s Liability Insurance with limit of no less than $1,000,000 per accident, policy or employee, for bodily injury or disease. Coverage is not required if Consultant has no employees and signs request to waive such insurance.
4. Professional Liability (PL) /Errors and Omissions(E&O): with limits no less than $2,000,000 per occurrence or claim, and $2,000,000 aggregate.
If Consultant maintains broader coverage and/or higher limits than the minimum requirements for each line of coverage shown above, City requires and shall be entitled to the broader coverage and/or the higher limits maintained by Consultant. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to City.
Other Insurance Provisions
The above required insurance policies are to contain or be endorsed to contain the following provisions:
1. City, its City Council, its officers, officials, employees, agents, and volunteers are to be covered as additional insureds, under Consultant’s CGL and AL policies, with respect to any liability arising out of work or operations performed by or on behalf of the Consultant including materials, parts, equipment, and personnel furnished in connection with such work or operations.
2. Consultant’s Insurance company(ies) agrees to waive all rights of subrogation against City, its City Council, its officers, officials, employees, agents, and volunteers for losses paid under the terms of Consultant’s CGL, AL, and WC policies which arise from work performed by Consultant under this Agreement.
City Council 16 – 40 9/15/2026
For any claims related to this contract, Consultant’s insurance coverage shall be primary and any insurance maintained by City, its City Council, its officers, officials, employees, agents, or volunteers shall not contribute with it.
A severability of interest provision must apply for all the additional insureds, ensuring that Consultant’s insurance shall apply separately to each insured against whom a claim is made or suit is brought, except with respect to the insurer’s limits of liability.
Insurance policies required herein shall provide that coverage shall not be canceled, suspended, voided, reduced in coverage or in limits, non-renewed by the carrier, or materially changed except after thirty (30) days prior written notice has been given to City. Ten (10) days prior written notice shall be provided to City for policy cancellation or non-renewal due to nonpayment of premium.
Certificate Holder on each Evidence of Insurance certificate shall be: City of Santa Ana, Attention: , , M- , Santa Ana, CA 92701. The name and
location of project must be included in the Description of Operations section of each certificate.
Self-Insured Retentions
Self-insured retentions must be declared to and approved by the City. The City may require the Consultant to purchase coverage with a lower retention or provide proof of ability to pay losses and related investigations, claim administration, and defense expenses within the retention.
Acceptability of Insurers
Insurance is to be placed with insurers authorized to conduct business in the State of California with a current A.M. Best rating of no less than A:VII, unless otherwise acceptable to City.
Verification of Coverage
Consultant shall furnish City with original Certificates of Insurance including all required amendatory endorsements (or copies of the applicable policy language effecting coverage required by this clause) and a copy of the Declarations and Endorsement Page of the CGL policy listing all policy endorsements before work begins. However, failure to obtain the required documents prior to the work beginning shall not waive Consultant’s obligation to provide them.
City reserves the right to require complete, certified copies of all required insurance policies, including endorsements required by these specifications, at any time.
Special Risks or Circumstances
City reserves the right to modify these requirements, including limits, based on the nature of the risk, prior experience, insurer, coverage, or other special circumstances.
City Council 16 – 41 9/15/2026
City Council 16 – 42 9/15/2026
City Council 16 – 43 9/15/2026
City Council 16 – 44 9/15/2026
City Council 16 – 45 9/15/2026
City Council 16 – 46 9/15/2026
City Council 16 – 47 9/15/2026
City Council 16 – 48 9/15/2026
City Council 16 – 49 9/15/2026
City Council 16 – 50 9/15/2026
City Council 16 – 51 9/15/2026
City Council 16 – 52 9/15/2026
City Council 16 – 53 9/15/2026
SAFE ROUTES TO PARKS AND
WHEELCHAIR ASSESSMENT PLAN
CITY OF SANTA ANA
REQUEST FOR PROPOSAL NO. 26-028A | MARCH 30, 2026
Exhibit 2
City Council 16 – 54 9/15/2026
1. Statement of Qualifications .......................................................1 a. Cover Letter................................................................................1 b. Services Provided.....................................................................2 c. Firm and Team Experience ....................................................12 d. Proposed Work Plan ................................................................27
2. Cost Proposal ...............................................................................28
3. Certifications & Attachments ...................................................30 Appendix (Resumes) .......................................................................42
TABLE OF CONTENTS
City Council 16 – 55 9/15/2026
1 Statement of
City Council Qualifications 16 – 56 9/15/2026
CITY OF SANTA ANA | SAFE ROUTES TO PARKS & WHEELCHAIR ASSESSMENT PLAN / 1 March 30, 2026
Mike Arizabal, Senior Transportation Analyst
City of Santa Ana – Public Works Agency
20 Civic Center Plaza
Santa Ana, CA 92701
Dear Mr. Arizabal and Members of the Selection Committee I’m excited to submit our interest in continuing our longstanding partnership with the City of Santa Ana. Over the years, we have built a strong track record of delivering thoughtful, community-driven plans that reflect the City’s vision and priorities.
Our work on key initiatives including the Downtown Complete Streets Plan, Central Santa Ana Complete Streets Plan, Active Transportation Plan, landscape design for Standard Avenue, the Vision Zero Action Plan and the current update, demonstrates our familiarity with Santa Ana’s neighborhoods, stakeholders, and implementation challenges. This experience allows us to move efficiently and effectively from planning to action while maintaining a high level of collaboration with City staff and the community.
We are also park planners and bring a holistic perspective that extends beyond park boundaries. We recognize that improvements do not stop at the park edge; rather, they must address safety, accessibility, and connectivity within and around these spaces. We anticipate that community engagement will surface important feedback related to park conditions and needs, and we are committed to documenting and synthesizing this input in a way that supports coordination across City departments. This integrated approach ensures that park planning efforts contribute to broader mobility, safety, and qualityof-life goals.
We take pride in developing plans that are not only visionary but also feasible and implementable. Over the past decade, our concepts, planning efforts, and robust community engagement strategies have helped the City secure more than $36 million in grant funding. In less than six years, many of these ideas have been realized through built improvements throughout Downtown Santa Ana, an outcome that reflects both the City’s leadership and the strength of our partnership. We are committed to continuing this momentum by delivering practical, fundable solutions that lead to measurable outcomes.
We value the meaningful relationships we have built with City staff, stakeholders, and residents, and we are eager to continue this collaboration. KTUA looks forward to the opportunity to support the City of Santa Ana in advancing safe, accessible, and vibrant parks and community spaces. KTUA acknowledges the Addenda released by the city on 03/16/2026.
Sincerely,
KTUA AUTHORIZED REPRESENTATIVE
Joe Punsalan | Principal Planner
Phone: (619) 294-4477 x127 | Email: [email protected]
a. Cover Letter / KTUA
1200 F Street
San Diego, CA 92101
619.294.4477
www.ktua.com
City Council 16 – 57 9/15/2026
CITY OF SANTA ANA | SAFE ROUTES TO PARKS & WHEELCHAIR ASSESSMENT PLAN / 2 b. Services Provided / KTUA
TASK 1: PROJECT MANAGEMENT
Task 1.1 Project Management Plan
KTUA will prepare a Project Management Plan (PMP) for
the Safe Routes to Parks and Wheelchair Assessment Plan (Plan) that includes key team contacts; scope, schedule, and budget; progress tracking and reporting procedures; invoicing processes and documentation standards; and
document control and QA/QC protocols. The PMP will define procedures for managing tasks, resources, communication, and performance, with mechanisms for early issue
identification and resolution. Once approved by the City, it will serve as the guiding document for project execution, and any changes will require approval from both parties. The PMP will be submitted for review and approval within thirty (30) days of contract execution.
Following contract execution, KTUA will also prepare
a comprehensive Project Master Schedule, to become
the Project Baseline Schedule upon approval by the
City. This schedule will detail all tasks, subtasks, start dates, durations, deliverable deadlines, milestones, and dependencies, including critical path activities. Deliverables will be submitted to the Project Development Team (PDT) per the schedule, with a two-week review period, after
which comments will be addressed, and two (2) revised
submissions will be provided.
Task 1.2 Kickoff Meeting and Project Development
Team (PDT) Meetings
KTUA will schedule and facilitate a virtual kick-off meeting within thirty (30) calendar days of contract execution.
KTUA will prepare the agenda and the meeting notes.
Recommended objectives for the kickoff meeting may
include, but are not limited to:
• Establish communication channels and protocols
• Review project objectives
• Refine Project Management Plan and Schedule
• Identify known preliminary issues, if any
• Develop ideas and strategies for community
engagement
• Develop a list of background data/plans to request and review
KTUA will schedule up to 16 monthly virtual PDT meetings to maintain strong communication and transparency,
and meet milestones. Monthly meetings will include the
consultant team, the City’s project manager, and key
stakeholders, such as the City’s Public Works, Parks and Recreation, and Planning and Building agencies, as well as the Orange County Transportation Authority (OCTA), Santa Ana Unified School District, etc. KTUA will be responsible for creating all meeting materials, such as agendas, handouts, presentations, and meeting notes.
Task 1.3 Federal Safe Streets and Roads for All (SS4A)
Grant Program Reporting
KTUA has extensive experience with managing grant-funded projects, including several funded by the SS4A program, such as the City of Rialto Safety Action Plan, Town of Apple Valley Complete Streets Action Plan (SS4A grant), and the Safe Mobility Santa Ana Plan update. KTUA will support the City with any reporting and invoicing requirements outlined by the SS4A Grant Program.
TASK 1 DELIVERABLES
• Project Management Plan and Schedule
• Kick-Off Meeting Agenda and Notes
• Monthly Invoices and Progress Reports
• PDT Monthly Meeting Materials, Agendas, and Notes
• SS4A Grant Reporting Methodology and Plans
TASK 2: EXISTING ANALYSIS AND ASSESSMENT
Task 2.1 Data Collection
With extensive experience working in Santa Ana, including current work on the Santa Ana Vision Zero Plan update, the KTUA team has the unique privilege of having consistent, present-day experience collecting and analyzing City data.
Proper selection and use of data is integral to supporting the development of a plan that is cohesive with other ongoing City efforts. The KTUA team will identify and develop a list of data to be used in Task 2 analyses, including, but not limited to:
• Traffic counts
• Bicycle and pedestrian counts
• Most recent 5-year collision data
• Posted speed limits and 85th percentile speeds
• Bus boardings and alightings at bus stops
• Sidewalk and curb ramp data
• Lighting data
Additionally, existing conditions will be observed and
recorded during fieldwork conducted by the KTUA team in the project’s early stages. Data not directly available will be submitted in a request to the City.
City Council 16 – 58 9/15/2026
CITY OF SANTA ANA | SAFE ROUTES TO PARKS & WHEELCHAIR ASSESSMENT PLAN / 3 Sub-Task 2.1.1 Literature Review
KTUA will conduct a thorough literature review of
existing local and regional planning documents to ensure consistency with related planning efforts and support
future project development. This review will summarize
key information, including vision statements, goals and policies, priority corridors, planned improvements, and previous recommendations, from documents such as the
Santa Ana General Plan, Parks Master Plan, Vision Zero
Plan and update, Safe Routes to School Plan, and others as applicable.
Reviewing these documents will help ensure that the Plan aligns with ongoing and past initiatives. The City’s recently completed Parks Master Plan, Safe Routes to School
Plan, and Vision Zero Plan will be particularly valuable in identifying current community priorities and project corridor needs.
Task 2.2 Walk and Bike Audits
The KTUA team proposes technical Walk and Bike Audits,
as well as ‘Walk and Talk’ events, to ensure high-quality data is collected while meaningfully engaging community members in the data collection process. This combination of data collection provides a unique opportunity to gather both quantitative and qualitative data.
Subtask 2.2.1 Technical Walk and Bike Audits
Evari will conduct technical walk and bike audits for
each of the City’s 48 parks and facilities, focusing on the pedestrian and bicycle access routes within a quartermile radius of each park location. Using the mobile field data collection platform developed under Task 2.1, Evari field crews will systematically document infrastructure conditions along routes to and from each park, capturing attributes including missing or damaged sidewalks, missing or non-compliant curb ramps, potential crosswalk locations, bicycle infrastructure gaps, traffic calming needs, traffic signal deficiencies, signage, and pedestrian-scale lighting conditions.
Field crews will document conditions using point, line, and polygon features tied to the project geodatabase, with
data made available to the full project team through the interactive web GIS applications developed under Task 2.1.
To efficiently cover all 48 locations, Evari will organize the audits into geographic clusters and, where feasible, coordinate scheduling with KTUA to align with community Walk/Bike and Talk events (Subtask 2.2.2). Field audits will be conducted during periods of peak park utilization to ensure observations reflect typical user conditions.
b. Services Provided / KTUA
Subtasks 2.2.2 Walk and Talk Events
To ensure diversity and inclusion, six (6) qualitative audits will be conducted with specific community members;
these sessions will be referred to as “Walk/Bike and Talk” events. The KTUA team will develop an audit tool featuring colloquial, simple, and easily understandable language
tailored for community members who may not be familiar
with technical terminology for use during these “Walk/Bike and Talk” events. This tool will enable community members to identify existing issues allowing them to pinpoint problems such as uneven sidewalks, missing curb ramps, potential locations for crosswalks, necessary bicycle infrastructure, traffic calming measures, and any required enhancements to roadway signage and suggest potential improvements.
The Walk/Bike & Talk events include: 1) an event exclusively for youth; 2) an event exclusively for seniors; 3) an event exclusively for individuals with special needs; 4) an
event involving cyclists; 5) an event with members of the Stakeholder Group; and 6) an event open to any member of the community.
Because many parks are located near schools, most events will begin at school sites to maximize safety and comfort for participants, particularly those who may feel cautious moving through the community amid the current political climate. Each event will be kept under 45 minutes to
further support participant comfort. Community members
will be invited to share their needs and typical routes to and around City parks. At each of these events, translation services will be provided in Spanish and Vietnamese, and necessary accommodations will be made to suit the specific needs of each group taking into account age, physical
condition, and capabilities. Latino Health Access (LHA) maintains established relationships with senior centers and organizations that serve older adults and youth, as well as a relationship with the Regional Center of Orange County, which works with individuals with special needs. City Council 16 – 59 9/15/2026 CITY OF SANTA ANA | SAFE ROUTES TO PARKS & WHEELCHAIR ASSESSMENT PLAN / 4 The Walk/Bike and Talk events schedule will be posted
on the project website; emailed and distributed to project stakeholder members, other LHA partners, promotores and participants; promoted via City’s website and newsletters (COSAS and Santa Ana Neighborhood) as well of Latino
Health Access Facebook, Instagram,Tik-Tok; and shared
with the network of neighborhood associations and ComLink leaders. Additionally, printed copies of the schedule will be distributed to the various community centers located within or near the parks. The schedule and invitation
emails to participate will also be sent to staff from OCTA, SAUSD, OCFA, and OCHCA; furthermore, staff from other
City departments including Parks & Recreation, Planning & Building, Community Development, and SAPD.
LHA will maintain a record of all outreach and promotion regarding the audits, and will take attendance at each of the audits and the Walk/Bike & Talk events, which may be shared with City staff if necessary.
Task 2.3 Existing Conditions Technical Memorandum
Based on the findings from Tasks 2.1 and 2.2, KTUA will prepare an Existing Conditions Technical Memorandum that summarizes opportunities, constraints, and challenges to be addressed in the Plan. This report will become the Existing Conditions chapter of the final Plan.
TASK 2 DELIVERABLES
• Data Collection/Existing Conditions Technical
Memorandum
• Walk and Talk Events (6) and Summaries
• Existing Bicycle and Pedestrian Facilities Map
• Existing Conditions Technical Memorandum
TASK 3: COMMUNITY OUTREACH AND
ENGAGEMENT
The KTUA team believes that the most effective project is one that is built by the community and for the community.
The project will be conducted in an open and transparent manner with community members participating throughout
the process. In-person and indirect outreach strategies will be utilized, including the creation of a diverse stakeholder group, pop-ups, community workshops, survey collection
and social media promotion and invitations, project
outreach and education conducted through presentations, announcements, pop-ups at city and community events,
emails, phone calls, text messages, social media posts, newsletters, mass distribution of the audit schedule, and flyers for community workshops.
b. Services Provided / KTUA
Task 3.1 Outreach and Engagement Plan
LHA will create and submit an inclusive Outreach and
Engagement plan designed to provide opportunities for
people of various ages to participate. This plan will allow us to meet the community “where they are” not only physically, but also in terms of their current level of knowledge regarding the subject matter, by creating educational infographics and a survey featuring easy-to-understand vocabulary, conducting in-person outreach in areas surrounding the parks, inviting residents to attend community workshops, and/or to complete the survey. LHA will take the time to provide project context and education regarding active transportation, safety, mobility, and access during every in-person interaction we have. This project and the outreach efforts will enable LHA to reach areas and individuals that could not be reached during the Vision Zero projects and the Santa Ana STPS plans, especially those walking and bicycling on routes that connect to park facilities.
LHA, in collaboration with the City of Santa Ana, will establish a stakeholder group comprising at least 20-25 members. First, LHA will compile a preliminary list of 40 potential stakeholders, which will include community members including youth and seniors who walk or use public transportation to access the city’s parks, also local CBOs (such as Santa Ana Active Street, The Bicycle Tree, KidWorks, El Centro Cultural de Mexico, THRIVE Santa Ana, Community HUB Santa Ana, etc.), as well as representatives from public institutions (OCTA, SAUSD, OCFA, OCHCA, City of Santa Ana departments: Parks &
Recreation, Planning & Building, Community Development, and SAPD), leaders from the different neighborhood association, Com-Link, sports leagues, faith based groups and businesses.
The KTUA team will plan and facilitate up to five (5)
Stakeholder meetings and be responsible for the preparation of agendas, presentation slides and meeting summaries.
Task 3.2 Website, Social Media, and Survey
Website
The KTUA team will develop a dynamic website that will be used throughout the entire planning process. Content will be developed for each major milestone, including, but not limited to, project updates, information about upcoming outreach opportunities, event summaries, links to relevant Santa Ana planning efforts, etc. An interactive online map will be included that allows residents and stakeholders to provide locationspecific comments and easily view the various datasets collected in Task 2.1. The City will be asked to create a simple landing page on its website that residents can bookmark and use to navigate to the consultant team’s custom project website.
https://parks-master-plan-sample-1-2-ktuagis.hub.arcgis.com/ City Council 16 – 60 9/15/2026
CITY OF SANTA ANA | SAFE ROUTES TO PARKS & WHEELCHAIR ASSESSMENT PLAN / 5 b. Services Provided / KTUA
Evari will provide support by including interactive web-based GIS applications built on relational SQL databases, providing the project team and City staff with dynamic tools that go beyond static map viewers. These applications will allow users to query, filter, and visualize collected data across multiple dimensions, for example, viewing collision clusters by severity and mode, overlaying infrastructure gaps against equity indicators, or comparing field audit findings across park service areas.
Promotional Materials & Social Media Graphics
The KTUA team will create graphics and social media
materials to spread project awareness and promote
outreach events throughout the planning process. Items
such as flyers, social media caption text, and press releases will be developed. Unique branding will be developed that will be used across all digital and printed media. A project logo, color palette, fonts, and taglines will be designed based on the City’s branding guidelines. All materials will also be provided in English, Spanish, and Vietnamese.
Survey
LHA will support KTUA with the creation of a comprehensive and culturally relevant survey that will be made available for in-person events and online. The survey will be conducted before any recommendations are developed to understand
focus areas, priorities, and constraints and opportunities residents observe regarding getting to and from city parks.
The survey will be available for a long window of time, providing residents with an easily accessible opportunity to share their input without attending an in-person event. LHA will share the survey link via email and text message with members of the stakeholder group, community partners,
and LHA promotores and participants; additionally, LHA
will coordinate with the administrators of the COSAS and Neighborhood Santa Ana newsletters to ensure the survey is disseminated on those platforms as well. The online survey will be made available in English, Spanish, and Vietnamese.
For those who do attend in-person events, printed surveys in English, Spanish, Vietnamese, and, when applicable,
Cantonese, will be available to increase survey participation rates.
Task 3.3 Community Workshops and Pop-Ups
LHA, in collaboration with KTUA and with the support
of stakeholders and the City will plan and facilitate
two (2) community workshops. The workshops will
be an opportunity not only for the community to offer
recommendations but also for us to present preliminary
results from the audits and surveys. The first workshop will be in the middle of the engagement timeline, we will present an overview of the project vision and will provide an opportunity to gather community input regarding
concerns about pedestrian and cyclist traffic safety, public transportation issues, and general mobility challenges
related to traveling to and from local parks. The second workshop will be held near the end of the project and will be designed to present the findings as well as the draft of the Safe Routes to Parks Plan to the community.
Four (4) pop-up events will be held prior to the last
community workshop. The intention behind these events is to meet people where they are, inviting them to complete the survey and/or attend the community workshops. These pop-ups will take place at City or community events, as well as at key locations situated near parks. The goal is to host a total of six events (four pop-ups and two workshops) and, whenever possible, to distribute them so that at least one event is held in each City ward. LHA will remain in constant communication with the City of Santa Ana to identify suitable locations and to confirm specific venues and dates.
LHA will incorporate popular education principles to ensure that the pop-ups and workshops are both interactive,
engaging and educational. LHA and KTUA will create all
materials used in workshops, including boards, printouts, visual aids, posters, comment cards, maps, etc., attendees will rotate through various stations. Staff members from the City and the KTUA team will be present to provide support City Council 16 – 61 9/15/2026
CITY OF SANTA ANA | SAFE ROUTES TO PARKS & WHEELCHAIR ASSESSMENT PLAN / 6 b. Services Provided / KTUA
and answer questions from the community. Spanish and
Vietnamese interpreters will be available at the community workshops, while English-to-Spanish interpretation services will be provided at the pop-up events.
LHA will share promotional materials and workshops flyers through its base of participants, posted on the project website and the City’s social media platforms, LHA social media platforms (Facebook, Instagram, TikTok), and shared with stakeholders, community centers, local CBOs, ComLink, City of Santa Ana, Neighborhood Initiatives, Santa Ana Unified’s Family and Community Engagement team, among
others, to support with the social media and newsletter promotion. LHA will maintain a record of all outreach and promotion regarding the workshops, and will capture
attendance at each event to share it with City staff when necessary. LHA will be proactive in selecting locations and times that are safer for the community, which is currently fearful of participating, and will work closely with the Orange County Rapid Response Network to monitor the area before and during in-person community events.
Subtask 3.3.1 Stakeholder Meetings
KTUA will facilitate up to five (5) virtual stakeholder meetings designed to give City staff and other key stakeholders
the opportunity to provide specific feedback and
recommendations unique to the needs of those attending
the meeting. Examples of stakeholders who may be part
of the meetings include, but are not limited to, City Public Works Agency, City Planning Building Agency, Santa Ana
Police Department, Orange County Transportation Authority, Santa Ana Unified School District, and Caltrans. KTUA will prepare meeting agendas, presentations, and summaries.
Task 3.4 City Council Meetings
KTUA will attend and present at up to two (2) City Council meetings, with one presentation following each community workshop. These presentations will be designed to provide Council members with updates on draft recommendations
and how they align with residents’ input received during the community engagement process. Council members will also be given the opportunity to comment on recommendations
to ensure the final Plan reflects the City’s broader goals and vision for the future.
TASK 3 DELIVERABLES
• Community Engagement Plan
• Online Social Media Materials, including website,
outreach promotion, and surveys
• Two (2) Community Workshops, Agendas, and Minutes
• Four (4) Pop-Up Events, Agendas, and Minutes
• Five (5) Virtual Stakeholder Group Meetings, Agendas
and Minutes
• Attendance and Presentation at City Council Meetings
(2)
TASK 4: ANALYSIS
Task 4.1 Collision Analysis
KTUA will use guidance from the following sources to
conduct the collision analysis:
• Local Roadway Safety Manual (LRSM)
• Systemic Safety Project Selection Tool
• The Caltrans Systemic Safety Analysis Report Program
(SSARP) Guidelines
• The current Vision Zero Plan Update (to provide
longitudinal consistency)
The collision analysis will consist of a systematic review and study of the data collected, using sources such as SCAG’s High Injury Network (HIN) and the California Highway Patrol’s Statewide Integrated Traffic Records System (SWITRS).
Data will be pulled for collisions occurring in the past five years, with a special focus on all pedestrian and bicycleinvolved collisions. The analysis will review collisions to identify correctable collision patterns, including , but not limited to: time of day, day of the week, lighting conditions, age of parties, year-by-year trends, primary collision factors, types of collisions, severity of injury, and fatalities. The data analysis will focus on instances of severe injuries and fatalities.
Task 4.2 Local Prioritization and Field Review
Task 4.2 will use a two-step prioritization matrix to identify sites (intersections or corridors) that will be explored further in Tasks 4.3 and 4.6. This prioritization matrix will begin with a review of quantitative data using criteria grouped into three categories: (1) Environmental Justice, (2) Safety, and (3) Park Usage and Parks Master Plan park access
recommendations. The data for these groups may include City Council 16 – 62 9/15/2026 CITY OF SANTA ANA | SAFE ROUTES TO PARKS & WHEELCHAIR ASSESSMENT PLAN / 7 demographic data, CalEnviroScreen and Healthy Places
Index scores, road classifications, crash data within ¼ mile of parks, crime data within ¼ mile of parks, existing and future population counts, average daily traffic (ADT), etc. This data will be used to determine general locations where certain criteria indicating the need for safety countermeasures are most prevalent. From here, a review of qualitative data will be conducted with specific data criteria grouped into two categories: (1) Community Input and (2) City Priorities.
This data will help refine the locations of all recommended projects.
The criteria selected and methodology used for the
prioritization matrix were developed with various
prioritization methodologies in mind, including:
• Industry best practices/standards (National Recreation and Park Association (NRPA), AmericaWalks, Safe Routes
Partnership, etc.)
• KTUA’s engagement toolkits
• City of Santa Ana Safe Routes to School Plan
• City of Santa Ana Parks Master Plan
• City of Santa Ana Vision Zero Plan and Update
The GIS tools the KTUA team have access to can also
support scenario-driven decision-making, such as
adjusting prioritization weights in real time to see how changes to criteria like collision severity, equity score, or proximity to schools reshape the ranking of recommended improvements. This approach gives City staff and
stakeholders a transparent, repeatable framework they
can continue to use beyond the life of this project - for grant applications, capital improvement programming, and ongoing performance tracking.
Task 4 Prioritization Process
• Run prioritization matrix on all 48
parks
Task 4.1
Task 4.2
Step 1: Prioritize Park Corridors
• Develop typologies for the SRTP plan,
using the existing five (5) park types
from the Park Master Plan
Task 4.2
Task 4.7
Step 2: Develop Typologies
• Craft recommendations for the
remaining park travelsheds
• Incorporate safest routes within each
park corridor
• Provide a ranked, CIP-style list of
improvements for park sites
Task 4.2
Task 4.7
Step 4: Park-by-Park Recomendations
• Develop recommendations and
concept drawings (in AutoCAD) for
3-5 projects.
• Identify costs associated for all
recommended improvements,
including the concept drawings).
Task 4.4
Task 4.5
Task 4.6
Task 4.7
Task 4.8
Step 3: Priority Corridor Recommendations
Step 5: Identify Funding Sources
• Identify funding sources that may be
used to support the implementation
of the proposed improvements
Task 4.5
b. Services Provided / KTUA
Task 4.3 Recommended Countermeasures Toolbox
Countermeasure Development
The development of recommended countermeasures will
be based on a comprehensive approach that combines
the existing conditions analysis as well as the KTUA team’s experience in active transportation, complete streets, and park planning. To illustrate potential countermeasures, the KTUA team will develop typologies based on the City’s
street classifications (Principal Arterial, Major Arterial, Primary Arterial, Secondary Arterial, Divided Collector, Collector, etc.) and the six park types identified in the 2022 Parks and Recreation Master Plan (Citywide Parks, Community
Parks, Neighborhood Parks, Pocket Parks, Urban Plazas,
and Special Use Facilities). Typologies will describe the potential countermeasures that are appropriate for each park and street classification combination. For example, a Community Park that is located on a Major Arterial may have recommendations that prioritize separated bikeways, bike boxes, green transition striping, enhanced crossings, pedestrian lighting, speed feedback signs, and wayfinding signage, where as a Pocket Park located on a Local Street may prioritize bicycle routes with sharrows, high-visibility crosswalks, curb extensions, and neighborhood traffic
circles.
City Council 16 – 63 9/15/2026
CITY OF SANTA ANA | SAFE ROUTES TO PARKS & WHEELCHAIR ASSESSMENT PLAN / 8 b. Services Provided / KTUA
Tailored Countermeasure Cutsheets by Typology
KTUA will design each typology combination as a cut sheet that includes information such as: descriptions of park and street classifications, typical amenities found in the park, a list of mobility recommendations, a list of existing City parks that match this typology, and an illustrative 3D rendering. The development of these typologies will serve as a template for the City to use as it explores the types of recommendations to pursue during project design and
implementation. See graphic above.
Designed by Engineers to Advance Implementation
Countermeasures will be recommended based on guidance
from the 6 E’s of Safe Routes to School Planning. In
particular, Arcadis will focus on countermeasures related to ‘Engineering’ and ‘Evaluation’ strategies.
• Engineering focuses on recommendations that
physically alter the built environment to slow vehicle
traffic, improve pedestrian and bicyclist visibility, and create a safer environment for vulnerable travelers.
This is particularly important for vulnerable travelers trying to access park space in vehicle-dominant areas
of Santa Ana. Countermeasures in Santa Ana should
focus on traffic calming, and enhanced accessibility and safety, including ITS-based solutions that prioritize active transportation movements. Additionally, recommendations to improve placemaking will add to the comfort of the
environment and can enhance the branding of Santa Ana’s parks as a network of open space across the city.
• Evaluation focuses on identifying metrics for quantifying the benefits from bicycle and pedestrian improvements.
Examples of evaluation countermeasures may include
bicycle and pedestrian counts, level of traffic stress, and the percent reduction in bicyclist and pedestrian collisions.
This information can then be used by the City of Santa Ana to determine if other areas would benefit from this type of improvement, as well as provide the City with metrics to assist with reporting and grant funding pursuits.
Examples of engineering and evaluation countermeasures, but not limited to, that will effectively slow traffic and create safer routes to parks are listed in the table below.
City Council 16 – 64 9/15/2026
CITY OF SANTA ANA | SAFE ROUTES TO PARKS & WHEELCHAIR ASSESSMENT PLAN / 9 b. Services Provided / KTUA
Task 4.4 Consistency Review
KTUA will review countermeasures for consistency
with local, regional, and state policies, regulations, and guidelines, as well as Safe Routes to Parks best practices developed by the Safe Routes Partnership. The KTUA
team will also ensure countermeasures align with related plans, including the Vision Zero Plan Update and previously adopted Santa Ana Safe Routes to Schools plan, First Street Multimodal Study, and other previous active transportation efforts, as well as OC Active (currently undergoing an
update) by OCTA, which was led by Arcadis and KTUA and
included a 6 Es toolkit for Orange County.
Task 4.5 Cost Estimates and Funding Sources
Arcadis will develop cost estimates for the projects and countermeasures identified in Task 4.2, Task 4.3, and Task
4.6. Cost estimates will be derived from a variety of reliable resources, including the Caltrans Consumer Construction Cost Indexes (CCI) and recently constructed projects in Southern California. Costs will be provided as unit costs and as total costs based on the concepts developed in Task 4.6.
Cost estimates can be used by the City to inform
future grant application pursuits. To facilitate future grant applications, the KTUA team will also develop a
comprehensive list of potential funding sources, including Federal, State, Regional, and Local funding sources. This deliverable will also include grant deadlines and direct links to specific grant programs. As the City is no stranger to applying for and winning competitive active transportation grants, identifying this information and gathering the
data and concepts early will help position the City as a competitive grant applicant to receive the funding needed to implement the Plan’s recommendations.
Task 4.6 Improvement Prioritization
Task 4.6 will use a specialized prioritization methodology to help the City make informed decisions on which projects to implement in short, mid, and long-term timeframes.
This methodology will use criteria similar to those in
Task 4.2, but will also incorporate new criteria specific to project implementation, such as the complexity and cost of the proposed recommendations, potential impacts on
maintenance operations, consistency/coordination with
other ongoing projects, etc. The results of this prioritization process will result in a table that indicates which projects the City should consider pursuing as funding opportunities arise in the near future. City Council 16 – 65 9/15/2026
CITY OF SANTA ANA | SAFE ROUTES TO PARKS & WHEELCHAIR ASSESSMENT PLAN / 10 b. Services Provided / KTUA
KTUA has extensive experience assisting cities with project implementation by purposefully designing plans with grantready projects that can be used to develop competitive grant applications. For example, the City of Santa Ana has secured over $36 million in grant funding as a result of the five previous plans that the KTUA team has led.
Task 4.6.1 Concept Drawings
Upon reviewing the results of the improvement prioritization process mentioned above, the City will select three to
five projects they would like the KTUA team to develop as concept drawings. Concepts will be designed in AutoCAD at a conceptual level that clearly communicates the potential improvements appropriate for the selected project. The
concept designs are meant to be flexible and tailored to the project such as a half-mile corridor concept design or a more detailed intersection design. Concept drawings will include the following:
• An aerial layout of the top priority corridors
• Conceptual design of the proposed roadway/bikeway
geometry and traffic-calming features
• Conceptual design of pedestrian crossing safety
elements (crosswalks, median refuge islands, curb
ramps)
• Basic callouts identifying the improvements and
potential major impacts to existing surface culture
• Potential for conceptual traffic signal modification design (depending on chosen countermeasure)
• Potential for conceptual signing and striping design
(depending on chosen countermeasure)
The goal of these concept drawings will be to close gaps to improve access, safety, and comfort. The drawings
can also serve as guidance, along with the typology
recommendations, to complete other corridors or
intersections identified. The City can use these concepts to make future grant applications more competitive and
accelerate project implementation.
Task 4.7 Agency Coordination
KTUA will coordinate with partner agencies, such as SCAG and OCTA, to review ongoing/previously planned projects and minimize project redundancies. The goal will be to
ensure all new projects identified through this Plan will close gaps and complement any projects already planned within Santa Ana. This agency coordination will complement the consistency review described in Task 4.4.
Task 4.8 GIS Mapping
KTUA will create maps for each of the forty-eight (48) park sites. Each map will include critical existing conditions data as well as recommendations identified in Task 4.2.
Recommendations may include, but are not limited to,
sidewalk gap closures, new ADA curb ramps, proposed
bicycle facilities, enhanced crossings, etc. These maps will be designed to meet City GIS requirements.
TASK 4 DELIVERABLES
• Collision Analysis
• Improvement Prioritization Technical Memorandum
• Cost Estimates
• Ten (10) Corridor Concepts
• GIS Maps
TASK 5: WHEELCHAIR ASSESSMENT
5.1 Wheelchair Assessment
Evari will lead the citywide wheelchair assessment by
updating the City’s 2017 Sidewalk Connectivity Plan curb ramp inventory to reflect current conditions. Evari will employ a tiered assessment methodology that leverages the City’s existing GIS data and maximizes the value of field work already conducted under Task 2.
The 2017 curb ramp inventory, which includes ramp
presence, visual compliance status, truncated dome
condition, obstructions, and impedance scoring, will serve as the baseline dataset. Evari will collect post-2017 project records from the City’s Capital Improvement Program, Safe Routes to Schools Plan, and other completed construction projects to identify locations where curb ramps were
likely constructed, replaced, or modified since the original assessment.
Curb ramp locations within the quarter-mile park buffer will be updated directly using field data captured during the technical walk and bike audits (Subtask 2.2.1), eliminating the need for duplicate field visits. For locations outside the quarter-mile buffer, Evari will conduct a systematic desktop review using current aerial and street-level imagery to verify ramp status against the 2017 baseline and flag locations that appear changed, missing, or inconclusive for targeted field verification. Only locations that cannot be definitively assessed through desktop review will require in-person
inspection.
The result will be an updated citywide curb ramp inventory maintaining the original attribute schema, delivered in the City’s GIS environment, with missing and non-compliant
City Council 16 – 66 9/15/2026
CITY OF SANTA ANA | SAFE ROUTES TO PARKS & WHEELCHAIR ASSESSMENT PLAN / 11 locations prioritized for future capital improvements. This updated inventory will be included as an appendix to the final Safe Routes to Parks and Wheelchair Assessment Plan.
TASK 5 DELIVERABLES
• Citywide curb ramp inventory (GIS shapefile)
TASK 6: SAFE ROUTES TO PARKS AND
WHEELCHAIR ASSESSMENT PLAN
Task 6.1 Draft Plan
KTUA will create a draft Plan structured around the 6 E’s (Education, Encouragement, Enforcement, Engineering,
Evaluation, and Equity) established by Safe Routes to
School planning principles. The Plan will be a friendly, graphic-heavy, easy-to-understand document that reflects all of the work completed. It will be purposefully designed for implementation to support the City’s commitment to
improving the lives of residents and visitors throughout Santa Ana. The draft Plan will be provided to the City for review via PDF. KTUA will provide two (2) rounds of revisions in preparation for sharing the final Plan with the City Council for adoption.
Task 6.2 Final Plan
KTUA will incorporate all City staff feedback collected through two routes of revisions and export a final version of the Plan. KTUA will prepare and present the final Plan to the City Council for adoption at an in person meeting. Upon completion of the Plan, the consultant team will provide the City with all applicable files at the close of the project, such as GIS datasets, engagement summaries, photos, CAD files, cost estimate spreadsheets, etc.
TASK 6 DELIVERABLES
• Draft Safe Routes to Parks and Wheelchair Assessment
Plan
• Final Safe Routes to Parks and Wheelchair Assessment
Plan
• PowerPoint presentation for City Council adoption
• Consolidated project files shared via Dropbox/Box/
Sharepoint
b. Services Provided / KTUA
City Council 16 – 67 9/15/2026
CITY OF SANTA ANA | SAFE ROUTES TO PARKS & WHEELCHAIR ASSESSMENT PLAN / 12 c. Firm and Team Experience / KTUA
KTUA is a collaboration of planners, landscape architects, GIS analysts, and graphic designers focused on the creation of livable outdoor areas meant to foster community.
Established in 1970 and with the partnership of our clients, KTUA has expanded the boundaries of a traditional landscape architecture office by incorporating active transportation, trail planning, parks and recreation planning, federal planning, and natural resource management practices into our portfolio. With this diversity, we are able to help shape the bigger picture while addressing the fine-grained details that contribute to our client’s sustainable natural and built environments.
Employees
27 • 9 Landscape Architects
• 8 Planners
• 2 Landscape Designers
• 2 Irrigation Designers
• 2 GIS Analysts
• 2 Marketing
• 2 Accounting
Generation
Leadership
3rd
• Chris Langdon, President
• Mark Carpenter, Treasurer
• Joe Punsalan, Secretary
• Brooke Whalen, Vice
President
Location
Office
• San Diego (Main Office)
1200 F Street
San Diego, CA 92101
Phone: 619-294-4477
INSIGHTFUL PLANNING INSPIRED DESIGN
Founded in
1970(55 Years)
California Corporation
Planning Services
• Existing Condition Assessments
• Data/Geospatial Analysis
• Community Engagement
• Visioning
• Conceptual Plans
• Master Plans
• Visual Simulations
• Grant Writing
Landscape Architecture Services
• Multi-Disciplinary Team Management
• Community Engagement
• Conceptual Design
• Schematic Design/Design
Development
• Construction Documents
• Construction Administration
• In-House Irrigation Design
• 3D Modeling/Rendering
i., ii
iii.
Managing Principal Agent: Joe Punsalan
Phone Number: (619) 294-4477
Email: [email protected]
Project Manager: Jacob Leon
Phone Number: (818) 468-9974
Email: [email protected]
City Council 16 – 68 9/15/2026
CITY OF SANTA ANA | SAFE ROUTES TO PARKS & WHEELCHAIR ASSESSMENT PLAN / 13 Katherine Padilla & Associates (KPA), Inc. is a full-service communications firm founded in 1994, specializing in strategic community outreach, public information campaigns, and community-based research. The firm offers services including workshops, focus groups, branding and design, social media, multimedia production, and translation, supported by a diverse, bilingual team. Certified as a WBE, DBE, MBE, and SBE, KPA has extensive experience partnering with cities, counties, and agencies across California to deliver effective, culturally responsive communication and engagement KATHERINE PADILLA & ASSOCIATES, INC.
ARCADIS
Arcadis is a global design and consulting firm with over 36,000 professionals in 70+ countries, delivering sustainable solutions for natural and built environments since 1888.
Its Mobility team develops safe, accessible, and equitable multimodal transportation systems by combining data-driven insights, technical expertise, and inclusive community engagement. Using innovative tools and best practices like Dutch design standards, Arcadis tailors solutions to local contexts such as Santa Ana, partnering with trusted organizations like Santa Ana Active Streets to ensure culturally fluent, communitysupported outcomes.
EVARI CONSULTING
Evari Consulting, Inc. (Evari) is a Small Business Enterprise (SBE) and WomenOwned Business Enterprise (WBE) founded in 2009, specializing in GIS-driven data collection, spatial database management, and interactive web applications for municipal infrastructure and planning. Evari develops mobile data platforms, enterprise geodatabases, and custom web dashboards with dynamic querying and scenariobased prioritization. The firm has delivered GIS and infrastructure projects nationwide, including street lighting master plans, ADA assessments, parks inventories, and active transportation planning. Evari has six employees, with two assigned to this project.
LATINO HEALTH ACCESS
Latino Health Access (LHA), a 501(c)(3) public health organization founded in 1993, advances health, equity, and sustainable change through community-driven education, services, and civic participation. With nearly 15 years of experience in active transportation outreach, LHA partners with cities and agencies across Orange County to deliver inclusive programs in schools, parks, and neighborhoods, removing participation barriers with childcare, translation, and transportation support. A pioneer of the Promotor de Salud/Community Health Worker model, LHA trains trusted community members to connect residents with services, navigate systems, and lead efforts that build community capacity, voice, and equitable policy change.
c. Firm and Team Experience / KTUA
Subconsultant Firms
City Council 16 – 69 9/15/2026
CITY OF SANTA ANA | SAFE ROUTES TO PARKS & WHEELCHAIR ASSESSMENT PLAN / 14 The area in the City of Santa Ana between the Regional Transportation Center (SARTC) and Downtown includes a variety of land uses: transit oriented development, high density housing, schools, churches, recreational centers, parks, transportation center and commercial. The transportation modes servicing this area cover a broad spectrum including pedestrian, bicyclist, transit and motorist. Although the scale of Downtown and the SARTC are walkable and bikeable, the study area faces multiple challenges from high vehicle speeds, wide streets, a lack of bicycle facilities, the presence of schools, uncontrolled pedestrian crossings, and unsafe access to transit and shopping.
To address these challenges, KTUA worked with the City to develop a Downtown Complete Streets Plan between Downtown and the Santa Ana Regional Transportation Center to improve access and mobility for all modes. The plan identified Complete Streets methods and designs to improve these modes within and around Downtown.
A large multi-lingual public outreach component included surveys, community advisory meetings, and a neighborhood workshop - a consecutive three-day workshop where walking and biking tours were conducted to gather input and intimately experience the Downtown area. The outcome was a plan with detailed recommendations for physical changes to streets, sidewalks and intersections that supports safe, active transportation along and across this study area. Through the public input process, stakeholder collaboration and primarily through the neighborhood workshop, five priority projects were identified and developed with preliminary designs. These concepts included planning level designs, 3D illustrations and costs estimates. The five projects were branded during the workshops with unique names such as Who’s on Third (Third Street), First on First (First Street), Cycle Track Square (Downtown to SARTC connection), Civic Duty (Civic Center Drive) and Ross is Boss (Ross Street).
Client Contact Information:
City of Santa Ana
Zed Kekula, Senior Civil Engineer
(714) 647-5606
[email protected]
Total Contract Amount/KTUA
Fee:
$219,122 / $150,389
Project Completion:
08/2015
Description of Services Provided:
• Complete Street Planning
• Community Engagement
Key KTUA Personnel:
• Joe Punsalan
• Jacob Leon
CITY OF SANTA ANA DOWNTOWN COMPLETE STREETS MASTER PLAN c. Firm and Team Experience / KTUA
City Council 16 – 70 9/15/2026
CITY OF SANTA ANA | SAFE ROUTES TO PARKS & WHEELCHAIR ASSESSMENT PLAN / 15 Building on the momentum of the award-winning Santa Ana Downtown Zone Complete Streets Plan, KTUA was retained to continue the Complete Streets planning effort for Central Santa Ana. To support this effort, KTUA created several StoryMaps to help keep residents informed and to tackle technical topics. The City has identified five existing corridors to be part of the study with the goal of adding connections between them, and adding new corridors for a complete network. Because of the success of the outreach process, designs and grant procurement for the Downtown project, the process for Central Santa Ana was almost identical, while incorporating additional grassroots organizations to conduct the outreach.
As part of this project, a four-day workshop was completed averaging more than 30 people per day over an entire weekend. Translation services and materials were provided in Spanish. Various activities took place such as tactical urbanism with a demonstration cycle track and parklet, walking and biking tours and a bus-walk tour combination. The activities allowed participants to experience the City streets and transit firsthand and provide insight as to what they would like to see improved.
Participants engaged in various mapping and table exercises to narrow down the various options to their most important priorities. A follow up workshop was then conducted to select the top ten corridors to be included in the final plan. Participants were also involved in the recommendations of each corridor which included intersection art, traffic calming and streetscape improvements.
Client Contact Information:
City of Santa Ana
Zed Kekula, Senior Civil Engineer
(714) 647-5606
[email protected]
Total Contract Amount/KTUA
Fee:
$297,000 / $297,000
Project Completion:
09/2017
Description of Services Provided:
• Complete Street Planning
• Public Outreach
Key KTUA Personnel:
• Joe Punsalan
• Jacob Leon
CITY OF SANTA ANA CENTRAL COMPLETE STREETS MASTER PLAN
c. Team and Team Experience / KTUA
City Council 16 – 71 9/15/2026
CITY OF SANTA ANA | SAFE ROUTES TO PARKS & WHEELCHAIR ASSESSMENT PLAN / 16 The Santa Ana Vision Zero Update (SAVZ) builds on the original SMSA from 2016 to evaluate citywide traffic safety through a comprehensive analysis of traffic collisions.
The analysis phase includes identifying contributing factors or patterns in the collision data, to locate specific hot spot locations, citywide trends, and best practices in traffic safety to identify solutions that will evolve the roadway network in Santa Ana into one where roadway users can make transportation decisions and unanticipated mistakes without risk of severe injury or death. The plan will utilize the FHWA-sanctioned Safe Systems approach to improve the safety across the network, using low-cost but highly effective countermeasures.
KTUA provided data collection, analysis, GIS map production, and led the safety evaluation and field reviews for street segments and intersections that present the highest risk to vulnerable roadways users (bicyclists and pedestrians). The prioritization of risk factors established included collision patterns, severity of injuries, and proximity to school, parks, and other pedestrian/bicycle generating uses.
Based on the data collection, field review and collision analysis; countermeasures for proposed projects were recommended and CAD drawings were produced in AutoCAD for 20 corridors, segments, and intersections to mitigate potential future collisions and facilitate safe and comfortable trips for children’s travel to and from school.
SAFE MOBILITY SANTA ANA UPDATE (SANTA ANA VISION ZERO)
Client Contact Information:
City of Santa Ana
Zed Kekula, Senior Civil Engineer
(714) 647-5606
[email protected]
Total Contract Amount/KTUA Fee:
$179,965 / $120,190
Project Completion:
02/2024
Description of Services Provided:
• GIS
• Collision Analysis and
Countermeasures
• Safe Routes to School
City Council 16 – 72 9/15/2026
CITY OF SANTA ANA | SAFE ROUTES TO PARKS & WHEELCHAIR ASSESSMENT PLAN / 17 The Santa Ana Standard Avenue Protected Bikeway project implemented a Class 2 buffered bike lane along Standard Avenue from Warner Avenue to Edinger Avenue, a Class 4 protected bike lane from Edinger Avenue to Chestnut Avenue, and a Class 3 bicycle boulevard from Chestnut Avenue to 3rd Street. This design also included a fully protected intersection at Standard Avenue and McFadden Avenue as well as partial protection/curb extensions at other various intersections. Signalized bicycle crossings included separate bicycle phasing and signal heads. Pedestrian improvements along the corridor include high-visibility crosswalks and bulb outs at all crossings and rectangular rapid flashing beacons at unsignalized crossings.
KTUA prepared conceptual renderings to effectively convey the proposed project features at community workshops and assisted in facilitating those meetings. KTUA also assisted with landscape design, placemaking and a landscape construction document package with specifications. Due to the experience is planning, designing, and implementing bikeways, as well as the Central Santa Ana Complete Streets Plan, KTUA provided bikeway and pedestrian design review for the various submittals.
Client Contact Information:
City of Santa Ana
Zed Kekula, Senior Civil Engineer
(714) 647-5606
[email protected]
Total Contract Amount/KTUA
Fee:
$30,840 / $30,540
Project Completion:
09/2021
Description of Services Provided:
• Landscape Architecture
• Complete Streets Planning
Key KTUA Personnel:
• Joe Punsalan
• Jacob Leon
• Stephen Nunez
CITY OF SANTA ANA STANDARD AVENUE PROTECTED BIKEWAY
iv. Relevant Project Experience
*Grant Win*
c. Firm and Team Experience / KTUA
City Council 16 – 73 9/15/2026
CITY OF SANTA ANA | SAFE ROUTES TO PARKS & WHEELCHAIR ASSESSMENT PLAN / 18 Client Contact Information:
Rich Berger, San Bernardino
County Transportation Authority
Planning Manager
(760) 792-0998
[email protected]
Total Contract Amount/KTUA
Fee:
$749,914 / $459,545
Project Completion:
Ongoing 2026
Description of Services Provided:
• Complete Streets Planning
Key KTUA Personnel:
• Joe Punsalan
• Jacob Leon
• Isabel Perez
• Nicole Rogge
• Marina Varano
• Amanda Herbst
TOWN OF APPLE VALLEY TOWN WIDE COMPLETE STREETS ACTION PLAN The Town of Apple Valley Complete Streets Action Plan (Plan) is a community-driven roadmap that has redefined the Town’s approach to safety and mobility. Informed by extensive public outreach and data analysis, the Plan identified 14 priority projects to improve walking, biking, transit, and ADA accessibility, with a focus on underserved areas and high-need corridors. Six projects also include grant-ready conceptual designs, detailed geoengineering surveys, 3D renderings, and cost estimates to accelerate implementation and support future grant applications. The technical depth of the Plan allowed the Town to move immediately from the planning phase into the grant application phase, setting a new standard for how small to mid-sized jurisdictions can accelerate infrastructure delivery.
To ensure the Plan addressed community priorities, the Town conducted a robust community engagement strategy that included a community survey, five pop-up events, eight focus groups and interviews, six advisory committee meetings, one virtual town hall, and two Town Council meetings. Through these activities, the Town engaged over 1,000 residents and gained insights into community needs that data alone could not provide.
The effectiveness of the Plan is best demonstrated by its immediate results. Within six months of adoption, the Town was awarded $10.9 million through the federal Safe Streets and Roads for All (SS4A) program and SBCTA Article 3 funds. This success establishes a ten-year pipeline of impactful capital projects that will enhance the quality of life for Apple Valley residents well into the mid-2030s. *Grant Win*
c. Firm and Team Experience / KTUA
City Council 16 – 74 9/15/2026
CITY OF SANTA ANA | SAFE ROUTES TO PARKS & WHEELCHAIR ASSESSMENT PLAN / 19 KTUA developed an Active Transportation Plan to provide a clear and comprehensive framework for safe, more convenient transit and non-motorized transportation options throughout the City. The plan identified and created a methodology to improve bicycle and pedestrian connectivity and safety by: expanding existing bicycle networks, improving pedestrian circulation, reducing vehicle trips, creating complete streets, prioritizing access to transit, creating a first and last mile transit routes plan, and prioritizing improvements to help build a healthy and livable community. The plan improves connectivity of the city’s bicycle network to the region’s network.
A critical component of this ATP was the Safe Routes to Parks plan which was vital to understand and enhance public safety, promote equitable park access, and improve the overall health and well-being of residents. This analysis and recommendations offered a unique opportunity to enhance safety and accessibility on both a citywide and targeted scale around parks. The methodology emulated the safe routes to schools framework with inclusive community engagement and mobility enhancements for all ages and abilities.
The project was guided by a Technical Advisory Committee which suggested popup outreach at City events was the best solution to garner community input. KTUA kept the project on an expedited schedule by moving forward with other critical tasks that didn’t require community input. Once these tasks were completed and in place, community input was incorporated, and the project was delivered on time.
Client Contact Information:
City of Rialto
Amparo Corona
Principal Budget and Financial
Analyst
(909) 421-7244
[email protected]
Total Contract Amount/KTUA
Fee:
$199,040 / $152,991
Project Completion:
03/2020
Description of Services Provided:
• Active Transportation
Planning
• Community Engagement
• Safe Routes to Parks
Key KTUA Personnel:
• Joe Punsalan
• Jacob Leon
CITY OF RIALTO ACTIVE TRANSPORTATION PLAN
c. Firm and Team Experience / KTUA
City Council 16 – 75 9/15/2026
CITY OF SANTA ANA | SAFE ROUTES TO PARKS & WHEELCHAIR ASSESSMENT PLAN / 20 This combined Active Transportation/Safe Routes to School Plan (ATP/SR2S Plan) assessed existing active transportation modes and provided infrastructure and policy recommendations intended to encourage more biking and walking throughout the city. The scope included a sidewalk inventory to identify gaps, and to provide a plan for sidewalk repair and replacement. Particular focus was also paid to identifying preferred routes for students to walk or bike to school. This is the city’s first ATP/ SR2S Plan and significant community engagement was an integral part of developing the plan, including bi-lingual participation and outreach “pop-ups” at established city events. This ATP/SR2S Plan is in compliance with active transportation program guidelines and is intended to be used to both guide future infrastructure investments and to support requests for future grant funding.
Client Contact Information:
City of El Centro
Adriana Nava
Community Services Director
(760) 337-4545
[email protected]
Total Contract Amount/KTUA
Fee:
$149,896 / $99,520
Project Completion:
02/2019
Description of Services Provided:
• Safe Routes to School
• Public Outreach
• Bi-Lingual Participation
Key KTUA Personnel:
• Jacob Leon
CITY OF EL CENTRO ACTIVE TRANSPORTATION/SAFE ROUTES TO SCHOOL PLAN c. Firm and Team Experience / KTUA
City Council 16 – 76 9/15/2026
CITY OF SANTA ANA | SAFE ROUTES TO PARKS & WHEELCHAIR ASSESSMENT PLAN / 21 SBCTA SAFE ROUTES TO SCHOOL PHASE 2
KTUA played a key role in supporting Lochner (Formerly known as KOA at the time of this project) in developing the San Bernardino Safe Routes to School Plan Phase II. KTUA provided assistance with project branding, announcements, flyers, social media content, and organizing/participating in stakeholder meetings and pop-up events. The Safe Routes to School plan covered most cities in San Bernardino County, but KTUA specifically led walk audits in Ontario, Montclair, San Bernardino, Yucca Valley, and Joshua Tree. KTUA also provided walking, bicycling, traffic calming, and other related active transportation recommendations for each of the schools we were responsible for. Joe Punsalan and Jacob Leon were the project leads from KTUA.
CITY OF UPLAND MOBILITY MASTER PLAN
KTUA conducted a policy review and data analysis to understand existing conditions; spearheaded a comprehensive, year-long community engagement process to understand community needs; and developed project recommendations to improve safe and efficient active transportation and public transit options for Upland.
The relative quality and quantity of mobility infrastructure of the City is well-served by an aging but nominally sufficient pedestrian network, whereas safety and comfort in accessing regional non-vehicular mobility options such as light rail, bus, and multipurpose paths is deficient. This is especially true for the disadvantaged communities within the wealthier 80,000-person City of Upland, though public outreach efforts were challenged to reach this population. In-person and online outreach methods were employed through multiple channels, with metrics for tracking success in reaching these areas slowly and surely improving. Walk audits in these neighborhoods were key outreach endeavors for understanding issues and distributing more information about surveys and additional opportunities for input.
Owner Contact/Reference:
Yesenia Diaz
Assistant Engineer
Upland Public Works Land
Development & Transportation
Division
(909) 931-4137
[email protected]
Total Contract Amount/KTUA
Fee:
$269,862 / $155,170
Project Completion:
10/2025
Description of Services Provided:
• Active Transportation
Planning
• Community Engagement
• Safe Routes to School
Key Personnel:
• Joe Punsalan
• Alex Samarin
• Madeline Pysher
• Marina Varano
Owner Contact/Reference:
SBCTA
Josh Lee
(909) 884-8276
[email protected]
Total Contract Amount/KTUA
Fee:
$70,760 / $70,760
Project Completion:
09/2017
Description of Services Provided:
• Safe Routes to School
• Public Outreach
Key Personnel:
• Joe Punsalan
• Jacob Leon
c. Firm and Team Experience / KTUA
City Council 16 – 77 9/15/2026
CITY OF SANTA ANA | SAFE ROUTES TO PARKS & WHEELCHAIR ASSESSMENT PLAN / 22 ADDITIONAL PROJECT LIST:
• County of San Diego, Safe and Equitable Access to Parks and Everyday Destinations (SEAPED) • City of Placentia, Open Spaces and Urban Greening
• Port of San Diego, Shelter Island and Harbor Island Bikeways • City of La Verne Parks and Recreation Master Plan
• City of Santa Fe Springs Park, Recreation, and Community Services Master Plan • City of Clovis, Wayfinding and Trail Design Guidelines • City of Arroyo Grande, Active Transportation Plan
• City of Moorpark Parks Master Plan
• County of San Diego, San Dieguito Road Pathway
• City of Merced, Merced Park, Recreation, & Open Space Master Plan • City of Bellflower Parks and Recreation Master Plan
• City of Whittier Parks and Recreation Master Plan
• OC Active: Orange County Active Transportation Plan
c. Firm and Team Experience / KTUA
City Council 16 – 78 9/15/2026
CITY OF SANTA ANA | SAFE ROUTES TO PARKS & WHEELCHAIR ASSESSMENT PLAN / 23 Orange County Transportation Authority, OC Active |
Orange County Transportation Authority| Orange County,
CA
Arcadis was engaged by OCTA to develop the first
countywide active transportation plan covering all 34 cities and the County. The plan identifies regional bikeways,
pedestrian priority areas, and includes a bicycle/pedestrian best practices toolkit with strategies, case studies, and tools based on the Five E’s: education, encouragement,
enforcement, engineering, and evaluation. Emphasizing
equity, the plan addresses the needs of disadvantaged and underserved communities across Orange County.
The team used a mix of traditional and innovative outreach methods to ensure an engaging and inclusive process. To identify priority areas, KTUA applied a GIS-based bicycle and pedestrian propensity model to pinpoint improvement locations. The project also featured creative outreach, including a school-focused chalk art contest, community– police engagement opportunities, and joint walk-to-school day events with the Orange County Public Health Agency.
Metro D (Purple) Line First/Last Mile Plan and First/Last Mile Planning Guidelines| Los Angeles Metro | Los Angeles, CA Arcadis planned and designed First/Last Mile (FLM)
improvements for seven future Purple Line subway stations between Wilshire/La Brea and Westwood/VA Hospital. The
work included walk audits within a half-mile of each station, analysis of existing conditions, stakeholder coordination with UCLA, LADOT, the VA, and the City of Beverly Hills, and extensive community engagement through interviews,
walk audits, and online surveys in partnership with Los Angeles Walks. The team developed and prioritized active transportation strategies based on implementation factors, advancing top projects to 30% design with pathway maps
and rough-order-of-magnitude cost estimates. In parallel, Arcadis created Metro’s First/Last Mile Planning Guidelines, establishing a consistent process, clarifying agency roles, and ensuring FLM improvements are integrated into transit projects and not value-engineered out.
Los Angeles Department of Regional Planning: East
San Gabriel Valley Mobility Action Plan| Los Angeles
Department of Regional Planning | East San Gabriel Valley, CA
As a subconsultant to KTUA, Arcadis worked on the
Dracea Avenue Neighborhood Greenway Corridor Study,
developing traffic calming and active transportation
c. Firm and Team Experience / KTUA
OCTA Safe Travels Education Program (STEP)
The Orange County Safe Routes to School Program
(2020–2023), managed by OCTA and OCHCA, Latino
Health Access, and Walk & Rollers, provided 25 elementary schools with free educational activities and resources to encourage safe walking and biking to school. Latino Health Access conducted outreach to 20 schools, implementing
3–4 activities at 8 of them, including bike rodeos, school assemblies, Walk to School Days, and parent presentations.
The program also distributed safety materials such as
helmets and reflective armbands, along with banners and suggested safe routes maps for each school. Approximately 600 students were reached per school, totaling about 4,800 students across the 8 participating schools.
OCTA Next Travels Education Program 2024-2027
This project is a continuation of the STEP program, providing another 25 elementary schools with free educational
activities and resources to encourage families to walk and bike to school safely and more often. Running from 2020 to 2023, the program is managed by OCTA and OCHCA and
supported by Latino Health Access, and Walk & Rollers, with Latino Health Access leading school engagement and the
educational component. The effort aims to reach at least 150 elementary schools countywide and deliver 3–4 educational activities at 25 of those schools.
Santa Ana Safe Routes to School Plan (2019-2020)
The project was supported by Latino Health Access
promoting, attending, and supporting school audits while also serving as a stakeholder member.
Santa Ana Street Lighting Master
A citywide street lighting Master Plan (2023–2025),
managed by the City of Santa Ana and developed with
Clanton & Associates, Inc., Evari GIS Consulting, Inc., IronStride Solutions, and Latino Health Access, assessed existing conditions, established updated industry-based guidelines, and identified near-term projects and cost
scenarios for improvements and maintenance. Latino Health Access led outreach and engagement, including workshops, stakeholder meetings, flyers, surveys, educational
presentations, Spanish translations, social media outreach, survey collection, and stakeholder list development.
City Council 16 – 79 9/15/2026
CITY OF SANTA ANA | SAFE ROUTES TO PARKS & WHEELCHAIR ASSESSMENT PLAN / 24 improvements. The study’s goal was to transform Dracea
Avenue into a safe, accessible greenway for bicyclists
and pedestrians. The corridor serves schools, residential neighborhoods, and commercial uses, requiring a contextsensitive approach to safety and mobility.
Project work included a physical inventory of corridor
conditions, public life surveys, and the development of a traffic calming toolkit tailored to local conditions. The team prepared preliminary design guidelines and concept-level recommendations to improve pedestrian and bicyclist safety while supporting neighborhood livability.
City of Santa Ana Street Light Inventory & Street Lighting Master Plan | City of Santa Ana | Santa Ana, CA
Evari provided GIS data collection, analysis, and web
application development services for the City of Santa Ana’s Street Lighting Master Plan. Evari completed a citywide inventory of approximately 16,000 streetlight fixtures, using a combination of deep learning AI screening and mobile
field data collection to verify, update, and supplement the City’s existing GIS data. Web GIS-based project tracking dashboards were developed for the City and project
stakeholders, including automated reporting to flag
immediate maintenance needs.
Building on the inventory, Evari developed interactive
web GIS applications that integrated streetlight data
with collision history, pedestrian crosswalk locations, bicycle facility information, school walksheds, and other contextual datasets to support prioritization and community engagement. This work gave the Evari team direct
familiarity with the City of Santa Ana’s GIS environment, data standards, and stakeholder coordination processes, providing a strong foundation for the data collection, GIS mapping, and web application development proposed under the Safe Routes to Parks and Wheelchair Assessment Plan.
Safe and Equitable Access to Parks and Everyday
Destinations (SEAPED) | Circulate San Diego | San Diego, CA
Evari provided pedestrian-scale lighting analysis for the Safe and Equitable Access to Parks and Everyday Destinations (SEAPED) project, evaluating exterior lighting conditions along streets and sidewalks within a quarter-mile travel shed of six San Diego parks. Using photometric modeling, Evari assessed lighting performance across pedestrian access
routes to identify underlit segments that pose safety risks to pedestrians and bicyclists traveling to and from park facilities. The analysis produced GIS-based visualizations and summary statistics documenting lighting levels along each route, providing project stakeholders defensible, datadriven evidence to support targeted lighting improvement recommendations and quick-build concepts designed to
improve park access at several under-resourced locations throughout the City.
City of El Monte Sidewalk Inventory & Web GIS Data
Management | City of El Monte | El Monte, CA
Together with KTUA, Evari conducted a comprehensive 250- mile sidewalk inventory for the City of El Monte in support of the City’s Vision Zero Action Plan. Working without any prior sidewalk data, Evari designed and deployed a mobile GIS field collection platform to systematically document sidewalk conditions, curb ramp types, and infrastructure deficiencies across the entire city. Field crews used tablets to capture georeferenced point-location data linked to standardized attribute schemas, while WebGIS dashboards provided the project team and City staff with real-time visibility into audit progress and findings as fieldwork unfolded.
Evari’s GIS team analyzed the collected data alongside
collision records to identify high-concentration corridors, bicycle and pedestrian incident hotspots, primary collision factors, and recommended countermeasures—with
comparisons to statewide and peer city statistics.
Santa Ana Safe Routes to School | City of Santa Ana
KPA supported the City of Santa Ana in the implementation of the Safe Routes to School (SRTS) Plan. KPA was
responsible for managing outreach to schools throughout the city, including frequent communication with school
administrators to explain the program and its benefits.
The team scheduled walk audits, managed audit tracking
databases, and coordinated the distribution and collection of tally sheets. KPA also conducted site visits to answer questions, reinforce participation, and emphasize the
importance of audits in strengthening grant applications for state funding aimed at improving infrastructure for walking, biking, and school access.
El Centro Imperial Avenue Complete Streets | City of El Centro
Launched in fall 2023, the Imperial Avenue Complete
Streets Plan aims to transform one of El Centro’s primary c. Firm and Team Experience / KTUA
City Council 16 – 80 9/15/2026
CITY OF SANTA ANA | SAFE ROUTES TO PARKS & WHEELCHAIR ASSESSMENT PLAN / 25 corridors into a safer, more vibrant, and pedestrian-friendly route. Serving as the project’s outreach lead under prime consultant KTUA, KPA developed a robust engagement
strategy that included bilingual press releases, e-blasts, social media content, and bilingual outreach materials. KPA also coordinated logistics for community meetings and
pop-up events, conducted bilingual intercept surveys, and produced summary reports capturing community input.
Community voices played a central role in shaping the plan, which preserves Imperial Avenue as a key regional roadway while including much-needed safety and beautification
enhancements.
City of Costa Mesa | Costa Mesa Pedestrian Master Plan
The City of Costa Mesa launched the Costa Mesa Pedestrian Master Plan to serve as a road map to identify solutions to improve walkability in the city. The plan proposed pedestrian improvements to infrastructure for connecting communities to schools, parks, businesses and other destinations
in Costa Mesa. KPA led the community engagement
component of the project, using a combination of walk
audits, surveys, and virtual community meetings to collect feedback from residents and stakeholders. All outreach
materials were developed in both English and Spanish to ensure inclusive participation.
c. Firm and Team Experience / KTUA
City Council 16 – 81 9/15/2026
CITY OF SANTA ANA | SAFE ROUTES TO PARKS & WHEELCHAIR ASSESSMENT PLAN / 26 Jacob Leon
Project Manager
Joe Punsalan
Principal-in-Charge
SUBCONSULTANTS
Isabel Perez
Senior Planner
Madeline Pysher
GIS Planner
CITY OF SANTA ANA
KTUA
Amanda Herbst
Senior Planner
Marina Varano
Deputy Project Manager
KPA
Community Engagement Support
Jessica Padilla
Katherine Padilla
Xavier Sibaja
ARCADIS
Transportation Engineering
Braulio Ranierz, PE
Cristina Martinez, AICP
Eric Tunell
Karen Iniguez-Sujata, PE
EVARI
GIS/Wheelchair Inventory Study
Brian Gaze, AICP
Dan Hamalainen, GISP
LHA
Community Engagement
Rosario “Charis” Galeas
Moises Vasquez
Nallely Enriquez
v. Team organization including key staff, subconsultants, and an organizational chart. vi. Resumes for all key staff proposed describing relevant experience can be found in the appendix, on page #30 c. Firm and Team Experience / KTUA
City Council 16 – 82 9/15/2026
CITY OF SANTA ANA | SAFE ROUTES TO PARKS & WHEELCHAIR ASSESSMENT PLAN / 27 d. Proposed Work Plan / KTUA
To expand our observations and exceed the needs of this project, our team has developed and will employ many
recognized industry best-practices tools and community
engagement strategies, and apply with context specific to Santa Ana. Our team understands the types of services
required in the RFP and have completed many projects
with similar scopes of services, successfully throughout the state. KTUA has also supported funding efforts by refining the scope and analysis to assist our client’s efforts for grant applications, providing added value tasks, infographics, narratives, and summaries to essentially, “plug and play” elements of the plan into an application.
Our team will bring the following ethos to this project.
Values and Vision, A Road Map to the Future – An agency’s values reflect their leadership and staff values, and those of the community they represent. This Safe Routes to Parks and Wheelchair Assessment Plan will help the City update these values and vision so that it can best determine the direction and priorities needed to make meaningful change.
A Strong and Comprehensive Community Engagement
Process – Community engagement is needed to genuinely
understand the community’s issues, determine the value of public services, and provide a vision for the future that the community supports. We have found that effective outreach means going to the public instead of expecting the public to come to us. The KTUA team’s effective and flexible
community engagement is the basis for measuring the
quantitative and qualitative components of this plan.
Community Driven Design Options – The efforts need to
focus on listening to public and staff input (as well as from elected officials) about issues, concerns, solutions, and priorities to direct the conceptual designs. The City has a great infrastructure base to build upon for safe, connected, and implementable recommendations.
KTUA recognizes that today’s political climate can directly affect community participation, particularly when concerns related to enforcement create hesitation around attending public workshops and events. This has been a consistent challenge across recent projects, where fear and uncertainty can limit engagement from key community members. To
address this, KTUA has partnered with trusted, communitybased organizations such as Latino Health Access, which brings culturally competent outreach strategies and
established relationships within the community. Through these partnerships, KTUA will foster safe, welcoming
environments for engagement, ensuring that workshops,
walk and talks, and conversations are inclusive, accessible, and reflective of the community’s full voice.
At the same time, KTUA understands and supports the
City Council’s strong commitment to improving roadway
safety, particularly in addressing speeding, racing, and the need for enhanced traffic control measures, and
pedestrian safety such as implementing stop bars at
intersections. We understand there may be concerns with this project and the ongoing Vision Zero project that KTUA is concurrently working on. By aligning with Vision Zero principles, KTUA will deliver actionable recommendations that extend beyond parks to create safer, connected
streets for all users and destinations. Recognizing the City’s workload and concurrent planning efforts, KTUA’s extended team is structured to function as seamless staff extension, coordinating closely with ongoing initiatives while maintaining project momentum. With clearly defined roles and a proactive approach, KTUA will guide the project efficiently, incorporating City input at critical milestones while advancing toward a practical, implementable plan that reflects both community needs and policy priorities within the expedited timeline.
KTUA’s approach goes beyond the scope by delivering
added value tasks that strengthen both the planning
process and long-term implementation. Drawing from its
experience as both active transportation and park planners, KTUA applies a Safe Routes to School informed framework that expands the conversation beyond park boundaries
to include the full journey to and from these spaces.
This perspective allows the team to capture real-world
challenges related to access, safety, and connectivity, while guiding community input toward actionable improvements
along surrounding corridors. Through interactive strategies such as walk and bike audits and “Walk and Talks,” KTUA will engage residents directly in the field, creating a deeper understanding of on-the-ground conditions and fostering meaningful dialogue that informs practical solutions.
In addition to engagement, KTUA provides enhanced
technical deliverables designed to support the City’s
future decision-making. The team will develop park
typologies, aligned with the City’s Parks Master Plan, to establish tailored access and safety strategies for different park types, supported by conceptual corridor plans for
high-priority examples. KTUA will also prepare targeted recommendations for all parks, ensuring a comprehensive and systemwide approach.
To meet the project timeline, the team has been intentionally structured to provide the capacity and flexibility needed to deliver within the 18-month schedule. With overlapping outreach efforts and clearly defined subconsultant roles, KTUA ensures consistent progress while maintaining highquality engagement and analysis. The result is a forwardlooking, implementable plan that equips the City with clear guidance for improving safe access to parks well into the future.
i, ii, iii
City Council 16 – 83 9/15/2026
2City Council Cost Proposal 16 – 84 9/15/2026
2. Cost Proposal / KTUA
CITY OF SANTA ANA | SAFE ROUTES TO PARKS & WHEELCHAIR ASSESSMENT PLAN / 28 City Council 16 – 85 9/15/2026
CITY OF SANTA ANA | SAFE ROUTES TO PARKS & WHEELCHAIR ASSESSMENT PLAN / 29
2. Cost Proposal - Schedule / KTUA
City Council 16 – 86 9/15/2026
3 Certifications
City Council & Attachments 16 – 87 9/15/2026
CITY OF SANTA ANA | SAFE ROUTES TO PARKS & WHEELCHAIR ASSESSMENT PLAN / 30
3. Certifications & Attachments / KTUA
CITY OF SANTA ANA
__________________________________________________________________________________
LEGAL NAME OF COMPANY TYPE OF BUSINES STRUCTURE
__________________________________________________________________________________
BUSINESS ADDRESS
__________________________________________________________________________________
NAME OF AUTHORIZED AGENT TITLE
__________________________________________________________________________________
E-MAIL ADDRESS PHONE NUMBER
SMALL, LOCAL BUSINESS PREFERENCE
Is your firm claiming small, local business preference for this soliciation? Yes, my firm is a small Santa Ana business*
Yes, my firm is a small Orange County business**
No, my firm is not claiming local business preference *Small Santa Ana business shall mean a business certified by the state department of general services as a small business, which has a substantial presence through either a headquarters or branch office within the geographical boundaries of the city, and which headquarters or branch office was established prior to the city inviting bids for the respective procurement.
**Small Orange County business shall mean a business certified by the state department of general services as a small business, which has a substantial presence through either a headquarters or branch office within the geographical boundaries of Orange County, and which headquarters or branch office was established prior to the city inviting bids for the respective procurement.
IF YOU ANSWERED YES, THEN YOU MUST SUBMIT YOUR BUSINESS LICENSE AND CA
DEPARTMENT OF GENERAL SERVICES SMALL BUSINESS CERTIFICATION WITH YOUR PROPOSAL. A post office box address within the city shall not qualify as a valid business location.
Proposer understands and agrees that this written RFP (or any part thereof specifically designated and accepted by the City of Santa Ana, hereinafter City) shall constitute the entire agreement between Proposer and the City only after it has been accepted by the City Council, endorsed by the Clerk of the Council with her signature and official seal noting hereon the action of approval of the Council, signed by the Executive Director or his duly authorized agent, and signed by the City Attorney, denoting her approval of the form of this document, and its execution, and when it or an exact copy of it has been either delivered to Proposer or deposited with the United States Postal Service properly addressed to the Proposer with the correct postage affixed thereto.
Proposer further agrees that upon delivery (as defined above) of the accepted agreement he/she will furnish City all required bonds and certificate of liability insurance within ten (10) days (excluding Saturdays, Sundays and City’s legal holidays), or the funds, check, draft, or Proposer’s bond substituted in lieu thereof ATTACHMENT A –
PROPOSER’S CERTIFICATION
THIS FORM MUST BE COMPLETED AND INCLUDED WITH THE PROPOSAL.
PROPOSALS THAT DO NOT CONTAIN THIS FORM WILL BE CONSIDERED NONRESPONSIVE.
KTU&A
1200 F Street, San Diego, CA 92101
Corporation
x
Joe Punsalan Principal Transportation Planner
[email protected] (619) 294-4477 x127
The certifications and attachments are acknowledged and signed and submitted separately through PlanetBids.
City Council 16 – 88 9/15/2026
CITY OF SANTA ANA | SAFE ROUTES TO PARKS & WHEELCHAIR ASSESSMENT PLAN / 31
3. Certifications & Attachments / KTUA
CITY OF SANTA ANA
Consultant shall provide three (3) references from other similar public agencies for which services similar to those specified in this RFP have been performed, including contact names and telephone numbers.
The respondent grants permission for the City to contact any individuals listed as references for additional information regarding your firm's qualifications.
City may disqualify a Proposer if:
• References fail to substantiate Proposer’s description of services and deliverables provided; or • References fail to support that Proposer has a continuing pattern of providing capable, productive, and skilled personnel, or
• City is unable to reach the point of contact with reasonable effort. It is the Proposer’s responsibility to inform the point of contact(s) of normal City working hours.
List and describe fully the contracts performed by your firm which demonstrate your ability to provide the supplies, equipment or services included in the scope of the proposal specifications.
Attach additional pages if required.
REFERENCE
Customer Name:_________________________Contact Individual: ____________________________ Address: ________________________________Phone Number:
_______________________________ Email: ____________________________________ Contract Amount: ________________________Year: ______________________________________ Description of supplies, equipment, or services provided:
__________________________________________________________________________________
REFERENCE
Customer Name:_________________________Contact Individual: ____________________________ Address: ________________________________Phone Number:
_______________________________ Email: ____________________________________ Contract Amount: ________________________Year: ______________________________________ Description of supplies, equipment, or services provided:
__________________________________________________________________________________
REFERENCE
Customer Name:_________________________Contact Individual: ____________________________ ATTACHMENT B –
REFERENCES
THIS FORM MUST BE COMPLETED AND INCLUDED WITH THE PROPOSAL.
PROPOSALS THAT DO NOT CONTAIN THIS FORM WILL BE CONSIDERED NONRESPONSIVE.
City of Upland Yesenia Diaz
(909) 931-4137
[email protected]
$269,862
City of Upland Master Mobility Plan
460 N Euclid Avenue
Upland, CA 91786
01/2024 - 10/2025
City of El Centro Angel Hernandez
Town of Apple Valley Complete Streets Action Plan
$749,914 11/2023 - 2025
Town of Apple Valley Rich Berger (now with SBCTA)
(760) 792-0998
[email protected]
14955 Dale Evans Parkway
Apple Valley, CA 92307
City Council 16 – 89 9/15/2026
CITY OF SANTA ANA | SAFE ROUTES TO PARKS & WHEELCHAIR ASSESSMENT PLAN / 32
3. Certifications & Attachments / KTUA
CITY OF SANTA ANA
Address: ________________________________Phone Number:
_______________________________ Email: ____________________________________ Contract Amount: ________________________Year: ______________________________________ Description of supplies, equipment, or services provided:
__________________________________________________________________________________ THIS FORM MUST BE COMPLETED AND INCLUDED WITH THE PROPOSAL.
PROPOSALS THAT DO NOT CONTAIN THIS FORM WILL BE CONSIDERED NONRESPONSIVE. (760) 337-3864
[email protected]
$329,250 06/2023 - 02/2025
City of El Centro Imperial Avenue Complete Streets Plan 1275 W. Main Street
El Centro, CA 92243
City Council 16 – 90 9/15/2026
CITY OF SANTA ANA | SAFE ROUTES TO PARKS & WHEELCHAIR ASSESSMENT PLAN / 33
3. Certifications & Attachments / KTUA
CITY OF SANTA ANA
This certification is required by the regulations implementing Executive Order 12549, as amended, Nonprocurement Debarment and Suspension, 2 CFR Part 2998, Subpart C, Responsibilities of Participants Regarding Transactions. The regulations were published as Part VII of the May 26, 1988, Federal Register (Pages 19160-19211), and as subsequently amended in 81 Federal Register 25585. (Before completing certification, read instructions which are an integral part of certification)
1. Pursuant to 2 CFR 180.335, the prospective primary participant, (i.e. grantee) certifies to the best of its knowledge and belief, that it and its principals:
a. Are not presently excluded or disqualified;
b. Have not been convicted within the preceding three years of any of the offenses listed in 2CFR 180.800(a) or had a civil judgment rendered against them for one of those offenses within that time period.
c. Are not presently indicted for or otherwise criminally or civilly charged by a government entity (Federal, State or local) with commission of any of the offenses listed in 2 CFR 180.800(a); and d. Have not had one or more public transactions (Federal, State or local) terminated within the preceding three years for cause or default.
2. Where the prospective primary participant is unable to certify to any of the statements in this certification, such prospective participant shall attach an explanation to this proposal. _____________________________________________________________ Signature
_____________________________________________________________ Name and Title of Official Authorized to Certify
On Behalf of Vendor
_____________________________________________________________ Date
ATTACHMENT C –
CERTIFICATION REGARDING DEBARMENT,
SUSPENSION, INELIGIBILITY, AND VOLUNTARY
EXCLUSION
THIS FORM MUST BE COMPLETED AND INCLUDED WITH THE PROPOSAL.
PROPOSALS THAT DO NOT CONTAIN THIS FORM WILL BE CONSIDERED NONRESPONSIVE.
Joe Punsalan, Principal Transportation Planner
03/30/2026
City Council 16 – 91 9/15/2026
CITY OF SANTA ANA | SAFE ROUTES TO PARKS & WHEELCHAIR ASSESSMENT PLAN / 34
3. Certifications & Attachments / KTUA
CITY OF SANTA ANA
The prospective participant certifies, by signing and submitting this bid or proposal, to the best of his or her knowledge and belief, that:
(1) No Federal appropriated funds have been paid or will be paid, by or on behalf of the undersigned, to any person for influencing or attempting to influence an officer or employee of any Federal agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with the awarding of any Federal contract, the making of any Federal grant, the making of any Federal loan, the entering into of any cooperative agreement, and the extension, continuation, renewal, amendment, or modification of any Federal contract, grant, loan, or cooperative agreement.
(2) If any funds other than Federal appropriated funds have been paid or will be paid to any person for influencing or attempting to influence an officer or employee of any Federal agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with this Federal contract, grant, loan, or cooperative agreement, the undersigned shall complete and submit Standard Form-LLL, "Disclosure of Lobbying Activities," in conformance with its instructions.
This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into. Submission of this certification is a prerequisite for making or entering into this transaction imposed by Section 1352, Title 31, U.S. Code. Any person who fails to file the required certification shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure.
The prospective participant also agrees by submitting his or her bid or proposal that he or she shall require that the language of this certification be included in all lower tier subcontracts, which exceed $100,000 and that all such subrecipients shall certify and disclose accordingly.
Signed:
Title:
Firm:
Date:
ATTACHMENT D –
NON-LOBBYING CERTIFICATION
THIS FORM MUST BE COMPLETED AND INCLUDED WITH THE PROPOSAL.
PROPOSALS THAT DO NOT CONTAIN THIS FORM WILL BE CONSIDERED NONRESPONSIVE.
Principal Transportation Planner
KTU&A
03/30/2026
City Council 16 – 92 9/15/2026
CITY OF SANTA ANA | SAFE ROUTES TO PARKS & WHEELCHAIR ASSESSMENT PLAN / 35
3. Certifications & Attachments / KTUA
CITY OF SANTA ANA
The undersigned consultant or corporate officer, during the performance of this contract, certifies as follows:
1. The Consultant shall not discriminate against any employee or applicant for employment because of race, color, religion, sex, or national origin. The Consultant shall take affirmative action to ensure that applicants are employed, and that employees are treated during employment without, regard to their race, color, religion, sex, or national origin. Such action shall include, but not be limited to, the following: employment, upgrading, demotion, or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship. The Consultant agrees to post in conspicuous places, available to employees and applicants for employment, notices to be provided setting forth the provisions of this nondiscrimination clause.
2. The Consultant shall, in all solicitations or advertisements for employees placed by or on behalf of the Consultant, state that all qualified applicants will receive consideration for employment without regard to race, color, religion, sex, or national origin.
3. The Consultant shall send to each labor union or representative of workers with which he/she has a collective bargaining agreement or other contract or understanding, a notice to be provided advising the said labor union or workers’ representatives of the Consultant’s commitments under this section, and shall post copies of the notice in conspicuous places available to employees and applicants for employment.
4. The Consultant shall comply with all provisions of Executive Order 11246 of September 24, 1965, and of the rules, regulations, and relevant orders of the Secretary of Labor.
5. The Consultant shall furnish all information and reports required by Executive Order 11246 of September 24, 1965, and by rules, regulations, and orders of the Secretary of Labor, or pursuant thereto, and will permit access to his/her books, records, and accounts by the administering agency and the Secretary of Labor for purposes of investigation, to ascertain compliance with such rules, regulations, and orders.
6. In the event of the Consultant’s non-compliance with the nondiscrimination clauses of this contract or with any of the said rules, regulations, or orders, the contract may be canceled, terminated, or suspended in whole or in part and the Consultant may be declared ineligible for further Government contracts or federally assisted construction contracts in accordance with procedures authorized in Execution Order 11246 of September 24, 1965, and such other sanctions may be imposed and remedies invoked as provided in Executive Order 11246 of September 24, 1965, or by rule, regulations, or order of the Secretary of Labor, or as otherwise provided by law.
7. The Consultant shall include the portion of the sentence immediately preceding paragraph (1) and the provisions of paragraphs (1) through (7) in every subcontract or purchase order unless exempted by rules, regulations, or orders of the Secretary of Labor issued pursuant to Section 204 of Executive Order 11246 of September 24, 1965, so that such provisions will be binding upon each subcontract or purchase order as the administering agency may direct as means of enforcing such provisions, including sanctions for noncompliance; provided, however, that in the event the Consultant becomes involved in, or is threatened with, litigation with a subconsultant or vendor as a result of such direction ATTACHMENT E –
NON-DISCRIMINATION CERTIFICATION
THIS FORM MUST BE COMPLETED AND INCLUDED WITH THE PROPOSAL.
PROPOSALS THAT DO NOT CONTAIN THIS FORM WILL BE CONSIDERED NONRESPONSIVE.
City Council 16 – 93 9/15/2026
CITY OF SANTA ANA | SAFE ROUTES TO PARKS & WHEELCHAIR ASSESSMENT PLAN / 36
CITY OF SANTA ANA
by the administering agency, the
Consultant may request that the United States enter into such litigation to protect the interests of the United States.
8. Pursuant to California Labor Code Section 1735, as added by Chapter 643 Stats. 1939, and as amended, no discrimination shall be made in the employment of persons upon public works because of race, religious creed, color, national origin, ancestry, physical handicaps, mental condition, marital status, or sex of such persons, except as provided in Section 1420, and any consultant of public works violating this Section is subject to all the penalties imposed for a violation of the Chapter.
Signed:
Title:
Firm:
Date:
THIS FORM MUST BE COMPLETED AND INCLUDED WITH THE PROPOSAL.
PROPOSALS THAT DO NOT CONTAIN THIS FORM WILL BE CONSIDERED NONRESPONSIVE.
Principal Transportation Planner
KTU&A
03/30/2026
3. Certifications & Attachments / KTUA
City Council 16 – 94 9/15/2026
CITY OF SANTA ANA | SAFE ROUTES TO PARKS & WHEELCHAIR ASSESSMENT PLAN / 37
3. Certifications & Attachments / KTUA
City Council 16 – 95 9/15/2026
CITY OF SANTA ANA | SAFE ROUTES TO PARKS & WHEELCHAIR ASSESSMENT PLAN / 38
3. Certifications & Attachments / KTUA
City Council 16 – 96 9/15/2026
CITY OF SANTA ANA | SAFE ROUTES TO PARKS & WHEELCHAIR ASSESSMENT PLAN / 39
3. Certifications & Attachments / KTUA
CITY OF SANTA ANA
(Title 23 United States Code Section 112 and Public Contract Code Section 7106) To the CITY OF SANTA ANA
In accordance with Title 23 United States Code Section 112 and Public Contract Code 7106 the proposer declares that the proposal is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation; that the proposal is genuine and not collusive or sham; that the proposer has not directly or indirectly induced or solicited any other proposer to put in a false or sham proposal, and has not directly or indirectly colluded, conspired, connived or agreed with any proposer or anyone else to put in a sham proposal, or that anyone shall refrain from bidding; that the proposer has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the proposal price of the proposer or any proposer, or to fix any overhead, profit, or cost element of the proposal price, or of that of any other proposer, or to secure any advantage against the public body awarding the contract of anyone interested in the proposed contract; that all statements contained in the proposal are true; and, further, that the proposer has not, directly or indirectly, submitted his or her proposal price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will not pay, any fee to any corporation, partnership, company association, organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham proposal.
Note: The above non-collusion affidavit is part of the proposal. Signing this proposal on the signature portion thereof shall also constitute signature of this non-collusion affidavit. Proposers are cautioned that making a false certification may subject the certifier to criminal prosecution. This form must be notarized.
Signed____________________________________________________________________________ State of ________, County of __________________________________________________________ Subscribed and sworn to (or affirmed) before me on this________ day of_____________, 20____, by ________________________, proved to me on the basis of satisfactory evidence to be the person(s) who appeared before me.
________________________
Notary Public Signature Notary Public Seal
ATTACHMENT F –
NON-COLLUSION AFFIDAVIT
THIS FORM MUST BE COMPLETED AND INCLUDED WITH THE PROPOSAL.
PROPOSALS THAT DO NOT CONTAIN THIS FORM WILL BE CONSIDERED NONRESPONSIVE.
City Council 16 – 97 9/15/2026
CITY OF SANTA ANA | SAFE ROUTES TO PARKS & WHEELCHAIR ASSESSMENT PLAN / 40
3. Certifications & Attachments / KTUA
CITY OF SANTA ANA
On April 4, 2022, the federal government stopped using the DUNS Number to uniquely identify entities.
Now, entities doing business with the federal government use the Unique Entity ID created in SAM.gov.
They no longer have to go to a third-party website to obtain their identifier. This transition allows the government to streamline the entity identification and validation process, making it easier and less burdensome for entities to do business with the federal government.
This RFP includes federal funding, and as such, the proposer must provide verification of their SAM.gov UEI and active registration status. Please attach your entity’s registration from SAM.gov, including UEI and active registration status. Respondents must have active registration on Sam.Gov at time of proposal submittal in order to be considered for award.
Proposer’s UEI:_______________________________________________ SAM.gov Registration Expiration Date:_____________________________ Signed: _____________________________________________________ Date:_______________________________________________________ ATTACHMENT G –
SAM.GOV UEI VERIFICATION
THIS FORM MUST BE COMPLETED AND INCLUDED WITH THE PROPOSAL.
PROPOSALS THAT DO NOT CONTAIN THIS FORM WILL BE CONSIDERED NONRESPONSIVE. 03/30/2026
09/18/2026
DD7UNQVTKEM6
City Council 16 – 98 9/15/2026
CITY OF SANTA ANA | SAFE ROUTES TO PARKS & WHEELCHAIR ASSESSMENT PLAN / 41 Kristie Bevacqua <[email protected]>
Registration Activated for KTU&A / DD7UNQVTKEM6 / 0LPA2 in the U.S.
Government's System for Award Management (SAM.gov)
1 message
[email protected] <[email protected]> Thu, Sep 18, 2025 at 10:46 AM To: [email protected], [email protected], [email protected]
Cc: [email protected], [email protected], [email protected]
Mark Carpenter, Sharon Singleton, Kristie Bevacqua,
The registration for KTU&A / DD7UNQVTKEM6 / 0LPA2 is now active in the U.S. federal government's System for Award Management (SAM.gov). If you did not provide a Commercial and Government Entity (CAGE) Code during the registration process, one has been assigned to you by the Defense Logistics Agency (DLA) CAGE Program.
To remain eligible to do business with the federal government, you must renew your entity's registration in SAM.gov every year. The annual renewal date for the registration is 2026-09-18 13:08:24.391.
You may invite additional users to manage or review your entity registration by following these steps:
1. Go to the SAM.gov website and sign in
2. On your Workspace page, scroll down to the “User Directory”
3. Enter the email address of the user you want to invite and select the email address from the list
4. On the next page, select the “Assign Role” button in the top right corner of the page
5. On the assign role page, follow the instructions provided and then select “Send Invitation” at the bottom of the page
6. The user will be notified
All invitees will receive an email message from SAM.gov with instructions on how to complete the process.
Remember, it is free to register in SAM.gov. Get free help at SAM.gov in the “Help” section and at the Federal Service Desk (FSD) where you will find SAM.gov user guides, quick start guides, helpful hints, videos, and frequently asked questions. If you are going through entity validation at SAM.gov for the first time and have questions, visit this list of FAQs.
In addition, if you are located in the U.S. and its outlying areas, you can get FREE support from your local APEX Accelerator (formerly known as PTAC), an official resource for government contracting assistance. Go to https://www.apexaccelerators.us to find your closest office.
Do not reply to this auto-generated email.
This email was sent from Production.
3. Certifications & Attachments / KTUA
City Council 16 – 99 9/15/2026
4 Appendix
City Council (Resumes) 16 – 100 9/15/2026
CITY OF SANTA ANA | SAFE ROUTES TO PARKS & WHEELCHAIR ASSESSMENT PLAN / 42 Education
• B.A., Geography, Sacramento
State University, 1998
Registrations
• ITE Professional Transportation
Planner
• LEED Green Associate
• GISP, GIS Certification Institute
#53646, exp. 1/31/2028
• League of American Bicyclists
League Certified Instructor
#2005
Affiliations
• Association of Pedestrian and
Bicycle Professionals (APBP)
• League of American Bicyclists
• California Parks and Recreation
Society (CPRS)
• Women in Transportation
• Circulate San Diego
Joe Punsalan | Principal Parks
& Transportation Planner
Joe Punsalan is a principal and oversees KTUA’s parks and active transportation planning practice for clients throughout California. He is actively engaged in citywide park master plan projects and large-scale active transportation planning projects such as complete street plans and corridor studies, active transportation plans, vision zero, and first/last mile connectivity. He is responsible for scope development, data analysis, public engagement and facilitation of workshops, focus group and stakeholder meetings, report writing, grant writing and reporting, and staff and consultant team management. He has a background in GIS for mapping, research and analysis, and uses a simplified approach to displaying complex methodologies.
CITY OF SANTA ANA DOWNTOWN COMPLETE STREETS PLAN
Project manager responsible for stakeholder and public outreach coordination, workshop and meeting facilitation, data gathering and analysis. Analysis included bicycle and pedestrian level of traffic stress and collision assessment. Responsible for the coordination between traffic engineering and outreach subconsultants for all aspects of the project. Other tasks include preparing materials, organizing, walk audit routing, leading a bike tour during the three-day charrette process, document and presentation preparation, bike and pedestrian project development and cost estimating.
CITY OF SANTA ANA CENTRAL SANTA ANA COMPLETE STREETS PLAN Project manager. As a result of the award-winning success of the Downtown Complete Streets Plan, this project provided similar planning, design and outreach efforts for Central Santa Ana. The project included a five-day workshop incorporating a demonstration project, walking and biking tours and workshop activities. Responsible for the coordination of workshops, activities, presentations, and staffing. Additional tasks include community advisory presentations, facilitation and subconsultant coordination. Managed corridor prioritization, data collection and preliminary engineering design review for ten corridors
CITY OF SANTA ANA SAFE MOBILITY SANTA ANA UPDATE (SANTA ANA VISION ZERO) Principal, responsible for overseeing the development of a comprehensive Vision Zero Plan with a Safe Routes to School (SRTS) component. Assisted in overseeing subconsultants, data collection, analysis, and GIS map production. Coordinated the successful comprehensive outreach tasks that included pop-up workshops, walk audits, neighborhood meetings and online engagement. Assisted and oversaw the data collection, field review and collision analysis; countermeasures for proposed projects and the CAD drawings for 20 corridors, segments, and intersections to mitigate potential future collisions and facilitate safe and comfortable trips for children’s travel to and from school.
TOWN OF APPLE VALLEY COMPLETE STREETS ACTION PLAN
Principal-in-charge overseeing task development and completion from the team and subconsultants. In-charge of quality control, client relations and overseeing major tasks, project development and community engagement.
CITY OF SAN DIEGO VISION ZERO
Team leader for the development of visual simulations for four priority corridors:
University Avenue, Market Street, Garnet Avenue and Imperial Avenue. Responsible for task assignment, bicycle and pedestrian design options, MUTCD and NACTO compliance and quality control.
Appendix - Resumes / KTUA
City Council 16 – 101 9/15/2026
CITY OF SANTA ANA | SAFE ROUTES TO PARKS & WHEELCHAIR ASSESSMENT PLAN / 43 Education
• Bachelor of Landscape
Architecture, California
Polytechnic State University,
San Luis Obispo, 2013
Registrations
• 2014 LEED Green Associate
Affiliations
• American Society of Landscape
Architects
• California Parks and Recreation
Society
• American Planning Association
• Association of Pedestrian and
Bicycle Professionals
• ACE Mentor - Board of Directors
• SDHS Geotech Academy -
Board of Directors
Jacob Leon |
Project Manager
Jacob Leon is dedicated to parks and recreation planning, trail and open space planning, complete streets planning, and community outreach. His project responsibilities entail project management, existing conditions analysis, overseeing community engagement, facilitating community workshops and special meetings with elected officials, and developing comprehensive project recommendations.
He is passionate about raising awareness of the benefits of thoughtful urban planning and public realm design, equitable access to parks and open space, and safe transportation infrastructure. His passion for nature, parks, trails and genuine community engagement reinforces his commitment to clients and the communities he works in throughout California.
CITY OF SANTA ANA VISION ZERO UPDATE
Project manager responsible for day-to-day coordination between the client and sub consultants. Jacob will oversee the community engagement process, the development of conceptual drawings for seven (7) corridors, and ensure all elements from the 2024 Plan are updated correctly with this planning effort.
CITY OF SANTA ANA CENTRAL SANTA ANA COMPLETE STREETS PLAN Key team member responsible for supporting all tasks associated with existing conditions analysis, community engagement, and recommendation development.
Jacob was responsible for Spanish translation and interpretation for all outreach events, developing 3D renderings for proposed recommendations, creating concepts in CAD, and assembling the final plan in Indesign.
CITY OF SANTA ANA ACTIVE TRANSPORTATION PLAN
Assistant project manager/associate planner, supported all major tasks. Special focus on comprehensive community engagement strategies, events, and materials. Assisted the team with existing conditions analysis, project development, cost estimation, and document production. Helped identify project recommendations and assisted with the design and review of key priority projects.
TOWN OF APPLE VALLEY COMPLETE STREETS PLAN
Project manager responsible for day-to-day coordination between the client and sub consultants. Played a vital role in supporting all community engagement efforts due to the Town’s diverse demographics. Helped facilitate and attended focus group meetings, pop-ups, workshops, and Advisory Committee meetings. Led the conceptual development of proposed complete-street improvements for several corridors. Provided guidance on cost estimates and the development of the final report.
CITY OF EL CENTRO IMPERIAL AVENUE COMPLETE STREETS PLAN, EL CENTRO, CA Project manager responsible for coordinating all elements of the scope of work between the client and project team. Tasks include facilitating monthly meetings, helping coordinate and facilitate community engagement efforts, overseeing the development of alternative conceptual drawings, and overseeing the development of the preferred concept that incorporates practical and innovative Complete Streets solutions that align with existing local and regional plans. Community engagement efforts include facilitating workshops, pop-up events, stakeholder meetings, and presentations to elected officials. Jacob’s Spanish-speaking proficiency allows him to provide equitable community engagement communication throughout the planning process. Jacob is also responsible for managing all subconsultants.
Appendix - Resumes / KTUA
City Council 16 – 102 9/15/2026
CITY OF SANTA ANA | SAFE ROUTES TO PARKS & WHEELCHAIR ASSESSMENT PLAN / 44 Education
• Master of City & Regional
Planning, California Polytechnic
State University, San Luis
Obispo
• B.S. in Environmental Studies
with a minor in Earth Science,
University of California, Santa
Barbara, 2016
Registrations
• California Planning Leadership
Academy, 2025
Affiliations
• American Planning Association
(Member)
• Association of Pedestrian and
Bicycle Professionals (Member)
Marina Varano | Deputy
Project Manager
Marina Varano is as senior planner serving on numerous active transportation and park master plans since joining KTUA. She has a Master’s in City and Regional Planning from Cal Poly, San Luis Obispo and holds a B.S. in Environmental Studies from the University of California, Santa Barbara. Marina previously worked for the City of San Luis Obispo’s Office of Sustainability and Natural Resources while in graduate school, where she contributed to climate action planning and implementation, as well as open space conservation planning projects. With a passion for sustainable and healthy communities, Marina hopes to contribute to impactful planning projects that will shape our cities for the better.
TOWN OF APPLE VALLEY COMPLETE STREETS ACTION PLAN
Deputy project manager / Senior Planner responsible for managing timelines, coordinating with clients and subconsultants, and leading advisory committee and Town Hall meetings. Guided development of a comprehensive plan identifying highneed complete streets improvements for underserved communities, including grantready projects. Within six months of adoption, the client secured nearly $10M in funding and pursued additional sources.
CITY OF UPLAND MOBILITY MASTER PLAN
Deputy project manager / Senior Planner. Key responsibilities include overseeing project timelines and tasks; managing relationships with clients, stakeholders, and sub-consultants; conducting policy review and data analysis to understand existing conditions; spearheading a comprehensive, year-long community engagement process to understand community needs, including walk audits, surveys, pop-up booths, community workshops, and technical advisory committee meetings; and developing project recommendations to improve safe and efficient active transportation and public transit options for Upland.
CITY OF ARROYO GRANDE ACTIVE TRANSPORTATION PLAN
Deputy project manager / Senior Planner. Key responsibilities include overseeing project timelines and tasks; managing relationships with clients, stakeholders, and sub-consultants; conducting policy review and data analysis to understand existing conditions; planning and delivering diverse and meaningful community engagement experiences; and developing an award-winning and deeply community-driven active transportation plan for a small city with substantial potential for and interest in walking and biking.
MOORPARK PARKS AND RECREATION MASTER PLAN
Deputy project manager / Senior Planner. Key responsibilities include executing project tasks to meet deliverables; managing relationships with clients, stakeholders, and subconsultants; planning and executing a range of community engagement methods, including pop-up booths, focus group meetings, interviews with leadership, and workshops; and developing a comprehensive, community-driven Parks and Recreation Master Plan.
SAN DIEGUITO ROAD PATHWAY PRELIMINARY ENGINEERING REPORT Project manager / senior planner. Key responsibilities include managing project timelines and consultant teams, conducting site visits, analyzing existing conditions, and developing recommendations for a shared use pathway along San Dieguito Road in unincorporated San Diego County. Deliverables include a Conceptual Alignment Study, Pathway Analysis, and Preliminary Engineering Report (PER) to support future implementation.
Appendix - Resumes / KTUA
City Council 16 – 103 9/15/2026
CITY OF SANTA ANA | SAFE ROUTES TO PARKS & WHEELCHAIR ASSESSMENT PLAN / 45 Amanda Herbst is a senior planner at KTUA. She earned a B.A. in Political Science from Point Loma Nazarene University and is pursuing a Master’s in City Planning at San Diego State University. Before entering urban planning, she worked in the nonprofit sector serving vulnerable populations in San Diego County. During graduate school, she worked as a land use planner at a planning and engineering firm and as a research assistant at SDSU, where she studied links between young breast cancer incidence and “locally undesirable land uses.” This work strengthened her passion for creating healthier connections between the built and natural environments and ensuring equitable access to spaces that support emotional, social, and physical wellbeing.
TOWN OF APPLE VALLEY COMPLETE STREETS ACTION PLAN
Senior planner. Key responsibilities included supporting and attending community engagement efforts such as workshops and pop up events, analyzing community feedback, asset inventory collection, graphic creation, and report writing and development.
PORT OF SAN DIEGO SHELTER/HARBOR ISLAND BIKEWAYS
Senior planner. Key responsibilities included the identification and analysis of existing literature related to Harbor and Shelter Island active transportation efforts, data collection and analysis of existing conditions, and the development of bicycle facility feasibility recommendations.
CITY OF LA VERNE PARKS AND RECREATION MASTER PLAN
Senior planner. Key responsibilities included supporting and attending community engagement efforts such as workshops and pop up events, analyzing community feedback, asset inventory collection, graphic creation, and report writing and development.
SANTA FE SPRINGS PARKS AND RECREATION MASTER PLAN
Senior planner. Key responsibilities included identifying and analyizing existing literature related to the City’s parks and recreation system, leading tot the development of a comprehensive literature review. Collected and summarized community feedback after project workshops and events. Supported report development through content editing and document formatting.
CLOVIS WAYFINDING AND TRAIL DESIGN GUIDELINES
Senior planner. Key responsibilities include the identification and analysis of existing literature related to active transportation and trails projects or policies in the City of Clovis. Responsible for using identified literature to develop a comprehensive literature review to guide the wayfinding and design guidelines document development. Developed report text and provided input and support on proposed recommendations/guidelines.
Education
• BA Political Science, Point Loma
Nazarene University, 2020
• Master City Planning, San Diego
State University, (expected
2026)
Affiliations
• American Planning Association
(member)
• San Diego Bird Alliance
(member)
Amanda Herbst |
Senior Planner
Appendix - Resumes / KTUA
City Council 16 – 104 9/15/2026
CITY OF SANTA ANA | SAFE ROUTES TO PARKS & WHEELCHAIR ASSESSMENT PLAN / 46 Education
• B.A. Urban Studies and
Planning, University of California
San Diego, 2023
Registrations
• LEED Green Associate
Isabel Perez | Senior Planner
Isabel Pérez joined the KTUA team as a Planner and Designer after earning her B.A. in Urban Studies and Planning from the University of California San Diego. Her technical skills include the Adobe Creative Suite, ArcGIS, AutoCAD, Lumion, Revit, and SketchUp – all of which she actively uses to create high-quality graphics, threedimensional models, and renderings for a range of projects involving trails, active transportation, complete streets, and parks and recreation planning. Before joining KTUA she became a LEED Green Associate, held a Planning Intern position for a local urban planning and design firm, and helped develop the Sustainable Food Systems course for the Department of Urban Studies and Planning at UCSD.
TOWN OF APPLE VALLEY COMPLETE STREETS PLAN
Planner/designer. Key responsibilities included conducting fieldwork and extensive research to develop written and graphical community engagement materials to encourage public participation. Additionally, provided support throughout all phases of the project, from developing branding to priority project planning-level recommendations.
CITY OF SANTA ANA VISION ZERO UPDATE
Deputy project manager. Coordinated day‑to‑day communication between the project manager, client, and subconsultants to maintain schedule alignment and project momentum. Supported the development of project materials across all phases, from existing‑conditions analysis through public outreach. Provided Spanish translation and interpretation support at outreach events and for all public facing material.
Additionally, contributed to the preparation of final deliverables for seven new planning‑level corridor concepts.
CITY OF EL CENTRO IMPERIAL AVENUE COMPLETE STREETS PLAN Planner/designer. Managed the creation of physical and digital community engagement material, field work of existing conditions, and took part in public engagement events for the curation of appropriate graphical material and text to be included within the final document.
CITY OF SAN DIEGO, SAFE AND EQUITABLE ACCESS TO PARKS AND EVERYDAY DESTINATIONS (SEAPED) Senior planner/designer. Managed and coordinated with the project team throughout all phases of the project. Key responsibilities included analyzing existing and proposed projects to ensure alignment with ongoing quick-build efforts within the study’s focus areas and proposing planning-level quick-build recommendations.
MERCED PARK, RECREATION, AND OPEN SPACE MASTER PLAN
The Merced Park, Recreation, and Open Space Master Plan is an ongoing project for the City of Merced. Isabel’s role consists of: attending community events to inform the public about the project and gathering community input to be used for the development of the Plan, the development of outreach materials, community feedback analysis, and final Plan recommendations.
A unique aspect of working on this project has been the diverse facility types found throughout the city, one of them being a zoo. The result of the project is a Plan that is expected to serve as a guide in the pursuit of future funding opportunities for the betterment of parks, recreation, and programming offered throughout the city.
Appendix - Resumes / KTUA
City Council 16 – 105 9/15/2026
CITY OF SANTA ANA | SAFE ROUTES TO PARKS & WHEELCHAIR ASSESSMENT PLAN / 47 Education
• B.A. Urban Planning and
Sustainable Development, with
a double minor in Geographic
Information Services and
Environmental Justice, Western
Washington University, 2024
Madeline Pysher is a Planner and GIS Analyst at KTUA. She holds a B.A. in Urban Planning and Sustainable Development with minors in Geographic Information Systems and Environmental Justice, specializing in equity mapping and analysis. She previously interned with a Metropolitan Planning Organization and Regional Transportation Planning Organization. Madeline is a LEED Green Associate and is skilled in ArcGIS, Microsoft Access, SketchUp, Adobe Creative Suite, and Python.
CITY OF SANTA ANA VISION ZERO UPDATE
Planner/spatial analyst. Primary responsibilities in developing the City of Santa Ana Vision Zero Update included analyzing data and fostering community engagement.
Collected, processed, and conveyed updated collision data using charts and maps. Fostered community engagement by creating an online comment map and contributing to an online survey, allowing the public to provide valuable feedback on the Vision Zero Update.
CITY OF UPLAND MOBILITY MASTER PLAN
Designed existing conditions maps for the Upland Mobility Master Plan utilizing copious data sources and spatial modeling techniques. I coordinated with and participated in leading Walk Audits around crucial connection corridors in Upland to foster understanding of the communities mobility needs. I created an online community comment map to integrate public feedback into the planning process. I contributed to the creation of Safe Routes to School and future bike path recommendations, and implemented visual representations for those recommendations into the final report.
UPLAND SAFE ROUTES TO SCHOOL
Primary responsibilities in developing the City of Upland Master Mobility Plan (MMP) include analyzing different data sources during the existing conditions phase and creating maps that accurately reflect the city’s current environmental, social, and physical conditions. Recommendations for Safe Routes to School were analyzed using a half mile walking distance from schools, a walk-audit with professionals and students, documentation of existing infrastructure, and community feedback—all to identify gaps in active transportation safety for pedestrians and cyclists traveling to and from schools in Upland.
TOWN OF APPLE VALLEY COMPLETE STREETS ACTION PLAN
Planner/spatial analyst. Key responsibilities include utilizing geospatial data and aerial imagery software to assist in graphical materials as well as the creation of an interactive map useful for assessing final recommendations.
Madeline Pysher | GIS Planner
Appendix - Resumes / KTUA
City Council 16 – 106 9/15/2026
CITY OF SANTA ANA | SAFE ROUTES TO PARKS & WHEELCHAIR ASSESSMENT PLAN / 48 Education
• Bachelor’s degree in
Psychology (Universidad
Autónoma de Occidente,
Sinaloa, México), 2004
Registration
• League Certified Instructor
of the League of American
Bicyclists (LCI #4933)
• Youth Mental Health First Aid
Certification
• Adult, Child and Baby First Aid/
CPR/AED Certification
• Community Emergency
Response Team (CERT)
certification
Born and raised in Sinaloa, Mexico, Charis was the first in her family to earn a bachelor’s degree in Psychology and developed an early passion for community engagement. Since joining Latino Health Access in 2006, she has led youth-focused projects and educational initiatives, collaborating with stakeholders across Orange County to improve quality of life in underserved communities. She is committed to advancing health and transportation equity through infrastructure, education, and supportive policies.
COMMUNITY ENGAGEMENT EXPERIENCE IN ORANGE COUNTY
• Former Santa Ana Active Streets Coalition (SAAS) Chair and founding member • Share Ourselves Organization Board Member
• Co-leaded Youth Engagement for the Santa Ana Building Healthy Communities Initiative
• Advocate for the Santa Ana Sundays On Main Open Street (SOMOS) event • Coordinated the LHA’s Integrated Outreach Initiative
• Coordinated and facilitated Youth educational classes and groups ACTIVE TRANSPORTATION OUTREACH & EDUCATION PROJECTS EXPERIENCE:
• Co-led the coordination and implementation of the LHA Downtown Santa Ana Wellness Corridor project (2012 - 2015)
• Co-led the coordination and implementation of the Santa Ana Active Streets:
Active Transportation Leadership Program (2015)
• Supported the community outreach for the Santa Ana Downtown Complete Streets Plan (2015 - 2016)
• Co-led the community outreach and engagement for the Central Santa Ana Complete Streets Plan (2016 -2017)
• Led the coordination and implementation of the Santa Ana Bicycle Safety Education & Outreach Campaign (2016)
• Led the coordination and implementation of the Santa Ana Bike Safety Education Campaign (2017-2018)
• Led the coordination and implementation of the Outreach and Educational Campaign to Improve Bicyclist and Pedestrian Safety in the City of Santa Ana (2018-2019)
• Led and Coordinated the community outreach and engagement for the Santa Ana Active Transportation Plan (2018-2019)
• Santa Ana Safe Routes to School Plan, Stakeholder member and supported School Audits (2019-2020)
• Led the coordination and implementation of the OCTA Bicycle and Pedestrian Educational Safety Campaign (2019-2020)
Rosario “Charis” Galeas |
Children & Youth Engagement
Department Program Director
Appendix - Resumes / KTUA
City Council 16 – 107 9/15/2026
CITY OF SANTA ANA | SAFE ROUTES TO PARKS & WHEELCHAIR ASSESSMENT PLAN / 49 Education
• Bachelor of Science, Public
Health (2019)
Registration
• CPR & AED
• Youth Mental Health First Aid
Nallely earned her bachelor’s degree in Public Health
Sciences from the University of California, Irvine in
2019, where she volunteered with Latino Health Access and developed a passion for grassroots community work. She joined the organization the same year and now serves as Program Coordinator in the Children and Youth Engagement Department.
In this role, she leads youth leadership and mentorship programs focused on substance use prevention and supports school-based bike and pedestrian safety initiatives. She has also served on the Leadership Committee for Santa Ana Active Streets, including as co-chair, advocating for safer streets for youth.
As the daughter of Mexican immigrant parents, Nallely is committed to empowering youth, advancing mobility justice, and promoting equitable policies through community-centered engagement.
ACTIVE TRANSPORTATION AND COMMUNITY ENGAGEMENT EXPERIENCE • Santa Ana Vision Zero Update (2026)
• OCTA Bus Stop Safety and Accessibility Plan (2023-Present) • OCTA Next STEP (2024-Present)
• Santa Ana Street Lighting Master Plan (2024-Present)
• Connect SoCal (2023)
• SAAS Leadership Committee Chair (June 2022-2023)
• Safe Mobility Santa Ana/Santa Ana Vision Zero (2022-2023) • OC Safe Travels Educational Program (2020)
• Los Alamitos Active Transportation Plan (2020)
• OCTA Pedestrian and Bike Safety Program (2020)
• SAAS Leadership Committee Member (2019-2023)
• Bike and Pedestrian Safety Education Campaign (2019)
• Santa Ana Active
Nallely Enriquez | Program
Coordinator
Appendix - Resumes / KTUA
City Council 16 – 108 9/15/2026
CITY OF SANTA ANA | SAFE ROUTES TO PARKS & WHEELCHAIR ASSESSMENT PLAN / 50 Education
• Santa Ana College Digital/Music
Production
Moises Vazquez is a Community Health Worker at
Latino Health Access, a music educator, musician and
a film/theater composer. His career is guided by a deep love for his culture and a commitment to reciprocity. Whether he is providing emotional and academic support to youth or composing for the stage, Moises is dedicated to the uplifting and healing of his community through community service and music.
ACTIVE TRANSPORTATION AND BIKE & PED EDUCATIONAL PROJECTS EXPERIENCE:
• Santa Ana Active Transportation Plan (2018-2019)
• OCTA Bicycle and Pedestrian Educational Safety Campaign (2019-2020) • SCAG Go Human Local Community Engagement & Safety Mini-Grants: Santa Ana “Safe Where You Are” (2020)
• SCAG Go Human Local Community Engagement & Safety Mini-Grants: Placentia Active Transportation, Health and Safety for Community (2020) • Los Alamitos Active Transportation Plan (2020)
• OCTA Safe Travels Education Program (2020-2023)
• SCAG Go Human Mini grant: Bike, Walk & Roll OC Project (2022) • Santa Ana Vision Zero Plan (2023)
• SCAG Go Human Community Hubs Grant Program: Bike, Walk & Roll OC (2023) • Connect SoCal 2024 Community Partner Program (2023)
• Santa Ana Street Lighting Master Plan (2024-2025)
• SCAG Go Human Community Streets Grant: Bike, Walk & Roll OC (2024) • OCTA Bus Stop Safety and Accessibility Plan (2024-2026) • OCTA Next Safe Travels Education Program (2024-2026)
• Santa Ana Vision Zero Update Plan (2026)
Moises Vazquez | Lead
Community Health Worker
Appendix - Resumes / KTUA
City Council 16 – 109 9/15/2026
CITY OF SANTA ANA | SAFE ROUTES TO PARKS & WHEELCHAIR ASSESSMENT PLAN / 51 Education
• Master of Urban and
Regional Planning, University
of California, Irvine; B.S.,
Environmental Science and
Policy, Chapman University
Registration
• Certified Planner, America
Institute of Certified Planners
(AICP), #31139
Affiliations
• American Planning Association
• WTS International (formerly
Women’s Transportation
Seminar)
Cristina Martinez is a Transportation Planner with 10 years of experience at Arcadis managing regional multimodal plans, active transportation projects, TOD access studies, first‑/last‑mile planning, and parking management. Her expertise is in complete streets, multimodal connectivity, curbside management, GIS, and environmental justice/social equity. She is a proven leader of multidisciplinary teams—planners, designers, and outreach specialists—delivering collaboratively developed solutions for regional and local clients.
OC ACTIVE (ORANGE COUNTY ACTIVE TRANSPORTATION PLAN)
Planning Lead. Led technical tasks to develop Orange County’s first countywide active transportation plan and implementation strategies for bikeway and pedestrian improvements.
METRO D (PURPLE) LINE & FIRST-LAST MILE GUIDELINES
Planning Lead. Led First-Last Mile analysis and planning for 4 stations and assisted in developing systemwide First-Last Mile Guidelines to integrate improvements into LA Metro’s capital transit process from planning through implementation.
EAST SAN GABRIEL VALLEY MOBILITY ACTION PLAN
Planning Lead. Led multimodal planning study for sustainable mobility solutions in the unincorporated areas of East San Gabriel Valley. Work included innovative community engagement, existing conditions analysis, development of a public web map, and suitability analysis to identify high-need areas.
DRACEA AVENUE NEIGHBORHOOD GREENWAY CORRIDOR STUDY
Project Manager. Managed traffic-calming recommendations for Dracea Avenue to develop a greenway for bicyclists and pedestrians as a subconsultant to KTUA.
Conducted physical inventory, public life surveys, and developed traffic calming toolkit and preliminary design guidelines.
Cristina Martinez, AICP |
Project Manager
Appendix - Resumes / KTUA
City Council 16 – 110 9/15/2026
CITY OF SANTA ANA | SAFE ROUTES TO PARKS & WHEELCHAIR ASSESSMENT PLAN / 52 Education
• Master of Urban Planning,
University of Southern
California; B.A., History, Arizona
State University
Affiliations
• WTS International (formerly
Women’s Transportation
Seminar)
• Mpact Conference (formerly
Rail~Volution)
Eric Tunell is an Urban Planner with 7 years of experience in planning and placemaking, specializing in community engagement and storytelling. He is experienced in active transportation, curb management, and county-level transit–land use integration projects, and is known for innovative public engagement that centers community voices. He previously supported LA Metro’s Shared Mobility division and brings 8 years of prior experience in public relations and corporate communications across private and nonprofit sectors.
LA METRO D (PURPLE) LINE & FIRST-LAST MILE GUIDELINES
Transportation Planner. Supported updates to the agency’s First/Last Mile Guidelines as part of the Metro D Line Extension project. Performed research and interviews on best practices for integration of micromobility into transit projects. Conducted policy research and analysis to improve communication and streamline project coordination efforts between the agency and local jurisdictions.
EAST SAN GABRIEL VALLEY MOBILITY ACTION PLAN
Transportation Planner. Facilitated the community engagement effort, contributed to the policy analysis and mobility needs identification and recommendations, wrote final report.
LADOT DODGER STADIUM TRANSPORTATION STUDY
Transportation Planner. Leading first/last mile and active transportation improvements evaluation and recommendations, supporting community and stakeholder engagement activities, conducting walk and bike audits, and supporting traffic impact analysis.
SCAG CURB SPACE DATA INVENTORY PROJECT
Transportation Planner. Served as City of Los Angeles liaison for multi-city project that digitized and analyzed curb space, identified and screened focus study corridors for pilot projects, led key stakeholder engagement workshops.
Eric Turnell | Senior Planner
Appendix - Resumes / KTUA
City Council 16 – 111 9/15/2026
CITY OF SANTA ANA | SAFE ROUTES TO PARKS & WHEELCHAIR ASSESSMENT PLAN / 53 Education
• M.S., Civil Engineering,
University of California,
Irvine, B.S., Civil Engineering,
University of California, Irvine
Registrations
• PE, Civil Engineer, CA (#88791)
Karen Iniguez is a Transportation Planner and a Registered Civil Engineer in California with extensive experience designing local street improvements, signing & striping, bike path plans, and parking facility concepts. She is skilled in multimodal level‑of‑service analyses, traffic impact studies, and comprehensive transportation evaluations across California. Key project experience includes alternatives analysis and conceptual design for the North San Fernando Valley BRT Corridor and signing/striping and QC for the Figueroa Streetscape final design. She is proficient in AutoCAD, MicroStation, Synchro, and Traffix, with a strong track record delivering active‑transportation and complete‑streets solutions.
FIGUEROA STREETSCAPE
Transportation Engineer. Led streetscape redesign of Figueroa Street corridor in Los Angeles, featuring protected bike lanes, pedestrian enhancements, and restriping/ resigning for multimodal users. Responsibilities included signing and striping design, underground utility research, and QA/QC of final plans.
CITY OF BAKERSFIELD THOMAS ROAD IMPROVEMENTS PROGRAM (TRIP) Transportation Engineer. Contributed to connecting State Route 58 to I-5 in Bakersfield by planning and designing a Class I multi-use path along freeway remnant parcels.
Supported feasibility study, bike path route selection, and development of plan/profile sheets. Prepared local street improvement plans including street profile redesign, sidewalks, signing & striping, and ADA curb ramps.
SANDAG UPTOWN BIKEWAYS PHASE 3
Transportation Engineer. Supported Phase 3 of SANDAG’s Uptown Bikeways project, adding bicycle and pedestrian facilities across Mission Valley and Hillcrest to reduce congestion, support climate goals, and promote community health.
WILSHIRE AVENUE BICYCLE BOULEVARD
Transportation Engineer. Worked on the design of a live mock-up installation of the bike boulevard, in which temporary neighborhood traffic circles were installed and assessed for effectiveness.
Karen Iniguez, PE | Cost
Estimates Lead
Appendix - Resumes / KTUA
City Council 16 – 112 9/15/2026
CITY OF SANTA ANA | SAFE ROUTES TO PARKS & WHEELCHAIR ASSESSMENT PLAN / 54 Education
• B.S. Civil Engineering, California
State Polytechnic University,
Pomona
Registrations
• PE, Civil Engineer, AL (#54326),
CA (#85189), CT (#38206), LA
(#48956), MA (#59640), ME
(#19000), MI (#6201314414),
NH (#18657), NV (#034324),
OH (#90734), OR (#107626),
TX (#152744), RI (#15698), VT
(#018.0136181))
Affiliations
• Institute of Transportation
Engineers
• Orange County Traffic
Engineering Council
Braulio Ramirez is a Principal ITS Engineer/Project Manager with 22 years of experience in Intelligent Transportation Systems, traffic signal design, and communications networks. He has led numerous ITS projects including RTSSP, ATMS, and TSP, and is skilled in ITS equipment integration, field inventories, line-ofsight surveys, design plan preparation, procurement, construction management, and acceptance testing.
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA) HARBOR BOULEVARD PILOT INNOVATIVE TSP STUDY
Design Lead. Provided design support for advanced detection and safety analytics on a 60-signal Harbor Boulevard corridor (Bravo! 543 bus routes). Managed LIDAR, radar, and camera system installations to detect near-misses, wrong-way drivers, and crosswalk violations during a nine-month evaluation. Scope included ITS integration, bus performance assessments, cost estimating, funding identification, and risk mitigation. Coordinated multi-jurisdictionally to improve transit efficiency and vulnerable road user safety.
CITY OF SANTA ANA MCFADDEN AVENUE TSP PILOT
Data Collection Lead. Led design of a cloud-based TSP system on McFadden Avenue to improve travel time and reliability for OCTA Route 66. Managed needs assessment, vendor evaluations, and concept plan development, resulting in a recommended solution now in procurement, deployment, and evaluation phases in collaboration with OCTA and the City of Santa Ana.
CITY OF LONG BEACH ECO-TOTEM POLE DISPLAY
Project Manager and Lead Engineer. Provided ITS support for City of Long Beach bicycle/pedestrian totem pole digital display installation to promote active lifestyles and enable user monitoring for planning and programming.
Brualio Ramirez, PE | ITS
Advisor
Appendix - Resumes / KTUA
City Council 16 – 113 9/15/2026
CITY OF SANTA ANA | SAFE ROUTES TO PARKS & WHEELCHAIR ASSESSMENT PLAN / 55 Education
• Master of City Planning, San
Diego State University
• BA, Communication, UC San
Diego
Registration
• American Institute of Certified
Planners (AICP)
Affiliations
• Caltrans D11 Bicycle and
Pedestrian Advisory Committee,
Member
• Caltrans Statewide Walk+Bike
TAC, Member
• San Diego Chamber of
Commerce Land Use and
Transportation Committee, Vice
Chair
Brian Gaze, AICP has over nineteen years of experience in environmental, land use, and transportation planning, with a focus on applying GIS to support equitable infrastructure and park access planning. His expertise includes developing publicfacing WebGIS dashboards, interactive web applications, and mapping tools that communicate safety deficiencies, service gaps, and equity considerations to diverse stakeholders. Since joining Evari in 2019 as Director, Brian has expanded the firm’s planning portfolio to include sidewalk and streetlight inventories, Vision Zero data analysis, and web-based engagement platforms. He specializes in connecting fieldcollected asset data to community engagement processes, ensuring that infrastructure investment strategies are data-driven, equitable, and defensible.
CITY OF SANTA ANA, CA — STREET LIGHT INVENTORY & STREET LIGHTING MASTER PLAN Project Director. Directed Evari’s GIS data collection, analysis, and web application development for the City’s Street Lighting Master Plan. Oversaw a citywide inventory of approximately 16,000 fixtures using AI-assisted screening and mobile field collection, and guided development of web GIS dashboards integrating collision history, pedestrian crosswalk locations, bicycle facilities, and school walksheds to support prioritization and community engagement.
CITY OF EL MONTE, CA — SIDEWALK INVENTORY & WEB GIS DATA MANAGEMENT (WITH KTUA) Project Director. Provided executive oversight for a comprehensive 250-mile sidewalk inventory supporting the City’s Vision Zero Action Plan. Guided planning, staffing, and workflow coordination to ensure field data collection, QA/QC, and GIS integration met standards for accuracy and defensibility. Delivered public-facing dashboards enabling the City to monitor progress and identify safety priorities in real time.
CITY OF AUSTIN, TX — CITYWIDE LIGHTING PLAN
Project Director. Provided strategic direction and executive oversight for Evari’s role in the City of Austin’s Citywide Lighting Plan. Guided development of a state-of-the-art pedestrian safety lighting analysis, including vertical illuminance modeling at crosswalk locations to evaluate driver visibility of pedestrians under real-world conditions.
Directed integration of safety, equity, and land use data into an interactive prioritization framework to support transparent, data-driven capital planning.
Brian Gaze, AICP | Principal/
Project Director
Appendix - Resumes / KTUA
City Council 16 – 114 9/15/2026
CITY OF SANTA ANA | SAFE ROUTES TO PARKS & WHEELCHAIR ASSESSMENT PLAN / 56 Education
• MS, Data Intelligence &
Geospatial Analytics, Saint
Mary’s University of Minnesota
• BA, Economics, Carleton
College
Registration
• Certified GIS Professional (GISP)
Dan Hamalainen, GISP is a GIS and infrastructure data specialist with expertise in field data collection system design, enterprise geodatabase development, and interactive web application development for municipal planning projects. He has managed largescale infrastructure inventories and condition assessments for parks, sidewalks, curb ramps, and streetlighting systems, leading field teams and developing standardized mobile collection tools and QA/QC protocols. Dan specializes in building scalable GIS platforms that transform complex field data into actionable decision-support tools, including dynamic prioritization dashboards, interactive web maps, and publicfacing engagement applications, helping municipalities move from assessment to implementation.
TOWN OF MAMMOTH LAKES, CA — PARKS AND RECREATION MASTER PLAN (WITH KTUA) GIS Developer and Inventory Specialist. Designed and implemented the asset inventory collection system for the Town’s Parks and Recreation Master Plan.
Developed the enterprise geodatabase, configured field data collection tools, and built web-based applications for sharing results with Town staff and stakeholders. Produced a standardized, interactive WebGIS environment that enabled transparent reporting and data-driven decision-making for the Town’s parks and recreation system.
CITY OF GARDENA, CA — VACANT LOT INVENTORY & ASSESSMENT (WITH KTUA) Inventory Manager and GIS Developer. Managed a GIS-based inventory and assessment of vacant parcels to identify potential sites for new community parks. Ran deep learning models combined with aerial verification to characterize parcels across six square miles. Developed the project geodatabase, interactive GIS web map, and multilingual StoryMaps displaying candidate sites and proposed park concepts.
OREGON DEPARTMENT OF TRANSPORTATION — ADA CURB RAMP ASSET INVENTORY & DATABASE
DEVELOPMENT
Project Manager. Led GIS data management for the audit of over 12,000 state-owned curb ramps across four Oregon counties, assessing ADA compliance for ODOT.
Developed enterprise geodatabase, mobile field collection applications, and officebased QC web applications. Migrated assessment data into construction-phase databases and developed progress tracking applications across the full project lifecycle.
SAN DIEGO, CA — SAFE AND EQUITABLE ACCESS TO PARKS AND EVERYDAY DESTINATIONS (SEAPED) GIS Lead. Conducted pedestrian-scale photometric modeling of exterior lighting along streets and sidewalks within a quarter-mile travel shed of six San Diego parks, evaluating lighting performance along pedestrian and bicycle access routes. Produced GIS-based visualizations and summary statistics documenting underlit segments to support targeted safety improvement recommendations.
Dan Hamalainen, GISP |
Project Manager / GIS Lead
Appendix - Resumes / KTUA
City Council 16 – 115 9/15/2026
CITY OF SANTA ANA | SAFE ROUTES TO PARKS & WHEELCHAIR ASSESSMENT PLAN / 57 Education
• Master of Business
Administration, California
State University Los Angeles /
Bachelor of Science, Business
Administration, California State
University Los Angeles
Registration
• Certified Charrette Planner,
Certified Charrette Manager,
Certified Public Meeting
Facilitator - National Charrette
Institute
• Trained in Mediation - LA City
Attorney’s Office, Dispute
Resolution Program
• Trained in Project Management
and Interpersonal
Communication - UCLA
Extension
• Completed coursework: Global
Logistics Specialist Certification
- California State University,
Long Beach
• Completed training: “The Art
of Hosting Conversations that
Matter” (Facilitative Techniques)
- Berkana Institute, Bangor, PA
Founder and President of Katherine Padilla & Associates (KPA), Inc. for nearly 30 years, Ms. Padilla Otanez is a communications strategist specializing in organizational development, facilitation, marketing research, and community/government relations, with additional experience in planning, architecture, and engineering.
KPA is a certified DBE/MBE/WBE/SBE firm. She previously managed drafting services for engineering and architecture projects while earning her MBA and BS, and has completed training in NEPA, CEQA, environmental justice, and diversity, equity, and inclusion.
IMPERIAL COUNTY TRANSPORTATION COMMISSION REGIONAL LONG-RANGE TRANSPORTATION PLAN
UPDATE, IMPERIAL COUNTY
Project Manager/ Managing Principal. Ms. Padilla Otañez developed the outreach plan, including marketing and branding, and assisted in recruiting and convening the Technical Advisory Committee, including key agencies and community organizations.
Oversaw all communications including press releases, social media, outreach to 16 community-based organizations, surveys, community meetings, pop-ups events, presentations, collateral developments, flyers, fact sheets, promotional materials and displays, and oversaw summary of input to guide project descriptions.
LA COUNTY NORWALK BL. METRO RAIL STATION FIRST-LAST MILE PLAN, LA COUNTY DEPARTMENT OF
PUBLIC WORKS / LA COUNTY LAMBERT RD METRO RAIL STATION FIRST-LAST MILE PLAN, LA COUNTY
DEPARTMENT OF PUBLIC WORKS
Project Manager/Managing Principal. For these two separate and related projects, Ms. Padilla Otañez developed the outreach plan and strategy; conducted interviews, with walk audits; planned and facilitated community meetings; developed surveys and press releases; contacted and engaged community-based organizations and stakeholders; and produced outreach materials, such as flyers, factsheets, social media messaging; and planned and staffed pop-ups at community events.
REGIONAL RESILIENCE FRAMEWORK, SOUTHERN CALIFORNIA ASSOCIATION OF GOVERNMENTS (SCAG), WITHIN SIX SOUTHERN CA COUNTIES.
Community Engagement Project Manager/Principal-in-Charge. KPA was a member a team conducting the SCAG Regional Resilience Framework. KPA was responsible for developing and conducting an Outreach & Engagement Strategy to involve community-based organizations focused on environmental justice from six Southern California counties in a meaningful process to develop the Framework. KPA recruited and conducted interviews with community-based organizations and tribal communities to obtain input to shape the tools of the Framework. KPA developed an outreach plan, recruitment letters, an interview-survey questionnaire, and conducted interviews.
TRANSIT-ORIENTED DISTRICT TOOLKIT ATLANTIC WHITTIER, LOS ANGELES COUNTY.
Project Manager/Managing Principal. KPA served on the KOA team and Ms. Padilla Otañez led the outreach strategy and program on behalf of LA County. Responsibilities included developing a community engagement plan, stakeholder interviews, in-person and online community meeting planning, survey development, student art contest, public relations and social media, and website development.
Katherine Padilla Otanez |
KPA Managing Partner/Project
Manager
Appendix - Resumes / KTUA
City Council 16 – 116 9/15/2026
CITY OF SANTA ANA | SAFE ROUTES TO PARKS & WHEELCHAIR ASSESSMENT PLAN / 58 Education
• Master of Public Administration,
San Diego State University,
Bachelor of Arts, Theater/
Economics, Occidental College,
Los Angeles
Registration
• IAP2, APR, PRSA, Certified
Professional Coach
(International Coaching
Federation)
Affiliations
• Certified International
Association of Public
Participation
• Accredited in Public Relations
• Public Relations Society of
America member
Ms. Padilla Bowen joined Katherine Padilla and Associates (KPA), Inc. in 2020, bringing more than 20 years of experience in government and nonprofit communications. She specializes in project management, event coordination, and meeting facilitation.
Prior to joining KPA, Ms. Padilla Bowen spent 15 years with the City of Carlsbad, where she supported multiple departments, including Community & Economic Development and Public Works, and served as a Public Information Officer in the City’s Emergency Operations Center. Earlier in her career, she spent six years leading communications efforts in the nonprofit sector.
CITY OF UPLAND MOBILITY MASTER PLAN
Senior Associate. As the outreach subconsultant on the Upland Mobility Master Plan, KPA led the charge in designing and implementing an inclusive and meaningful community engagement strategy. Ms. Padilla Bowen developed the comprehensive outreach plan and coordinated and staffed a wide range of in-person engagement activities from walk audits to community workshops to popup events, ensuring that community voices were heard and reflected throughout the planning process.
LOS ANGELES COUNTY DEPARTMENT OF PARKS & RECREATION STRATEGIC PLAN, LA COUNTY DEPARTMENT OF PARKS & RECREATION Senior Associate. Coordinated meeting space, social media, videography, flyers, and meeting support staffing and materials and attendance tracking at five Strategic Plan rollout community meetings in each LA County supervisorial district. These meetings were an opportunity for County of LA Parks & Rec Department staff to introduce the Park and Recreation Strategic Plan to community members.
CITY OF EL CENTRO IMPERIAL AVENUE COMPLETE STREETS
Senior Associate. Launched in fall 2023, the Imperial Avenue Complete Streets Plan aims to transform one of El Centro’s primary corridors into a safer, more vibrant, and pedestrian-friendly route. Serving as the project’s outreach lead under prime consultant KTUA, KPA developed a robust engagement strategy that included bilingual press releases, e-blasts, social media content, and bilingual outreach materials. KPA also coordinated logistics for community meetings and pop-up events, conducted bilingual intercept surveys, and produced summary reports capturing community input. Community voices played a central role in shaping the plan, which preserves Imperial Avenue as a key regional roadway while including much-needed safety and beautification enhancements.
IMPERIAL COUNTY ACTIVE TRANSPORTATION PLAN
Senior Associate. With KTUA, KPA developed a Community Involvement Strategy plan to involve community members throughout Imperial County. The community outreach focused on leveraging a County-wide TAC, who provided input on the plan and helped get the word out about engagement opportunities, including a survey and pop-up events. To reach the widest amount of community members possible, the team strategically planned and staffed 10 popup events throughout the County, from Back to School Night at Imperial Valley College to Día de los Muertos and Veterans Day festivals to visits at libraries in more remote areas of the County. This helped the team secure valuable feedback on areas of concern that shaped the plan. Additionally, KPA’s strong work on the ATP helped secure a second contract with Imperial Valley Transportation Commission for their Long-Range Transportation Plan.
Jessica Padilla Bowen |
Senior Associate/Project
Manager
Appendix - Resumes / KTUA
City Council 16 – 117 9/15/2026
CITY OF SANTA ANA | SAFE ROUTES TO PARKS & WHEELCHAIR ASSESSMENT PLAN / 59 Education
• Master of Public Administration,
City University of New York,
Baruch College / Bachelor’s
in Communication Sciences,
Universidad Autonoma
Metropolitana, Mexico City
Registration
• Professional Designation in
Public Relations, University of
California, Los Angeles
Collaborative agency leader and social entrepreneur with a passion for serving community, educational, and arts organizations.
Engaging communicator with strong people skills and breadth of knowledge from life-long learning. Bilingual communicator (Spanish and English) with expertise in connecting with diverse communities. Led successful merchant and community engagement campaigns.
Secured funds and sponsorships and brought together people and organizations to leverage synergies toward achieving program goals. Delivered outstanding PR coverage from Los Angeles Times, the New York Times, the Washington Post, CSPAN, PBS, and other outlets.
LOS ANGELES COUNTY DEPARTMENT OF PARKS & RECREATION STRATEGIC PLAN, LA COUNTY DEPARTMENT OF PARKS & RECREATION Outreach Associate. Xavier hosted three pop-up community events in Belvedere Park (East Los Angeles), Mona Park (Compton) and George Lane Park (Lancaster), to raise awareness on DPR’s Strategic Plan while conducting a related survey in English and Spanish. Created outreach site visit reports for each event. Assisted with five Strategic Plan rollout community meetings in each LA County supervisorial district.
LOS ANGELES COUNTY DEPARTMENT OF PUBLIC WORKS, RE-ENVISIONING WHITEMAN AIRPORT, PACOIMA Outreach Associate. Xavier canvased the Pacoima area to raise awareness of a community Town Hall meeting. Supported Town Hall and meeting event logistics and edited and translated community comment reports.
CONNECTING SAN PEDRO PROJECT PEDESTRIAN IMPROVEMENT & MULTI-MODEL ACCESS Outreach Associate. Planned canvassing tour in Central San Pedro and visiting 140 residences and businesses to increase awareness about the project improvements and answer questions. Coordinated joint meetings with NW San Pedro and Central San Pedro Neighborhood Councils, as well as additional meetings with the San Pedro Historical Waterfront Business Improvement District and San Pedro Chamber of Commerce. Coordinated with graphic designer the production of the project-branded collateral.
CITY OF FRESNO SOUTH CENTRAL FRESNO COMMUNITY TRUCK REROUTE STUDY (AB617) Outreach Associate. Wrote Outreach Plan to strategically guide the project communication. Hosted two drop-in stakeholder presentations at City of Fresno Public Library and Community Center. Hosted Community Advisory Group and Technical Advisory Committee (TAC) virtual meetings and wrote meeting briefings. Coordinated with TAC members to disseminate an assessment stakeholder’s survey. Coordinated with graphic designer for the production of the project-branded collateral.
IMPERIAL COUNTY TRANSPORTATION COMMISSION, LONG-RANGE TRANSPORTATION PLAN, IMPERIAL COUNTY
Outreach Specialist/Translation. Produced Technical Advisory Committee (TAC) meeting reports to capture stakeholder feedback to guide the final plan, helped organize and conduct field outreach and connected with diverse community members through county-wide pop-up events, assisted at virtual meetings and wrote outreach summaries.
Xavier Sibaja | Community
Outreach and Translation
Appendix - Resumes / KTUA
City Council 16 – 118 9/15/2026
I PROJECT TITLE:
Safe Routes to Parks Plan
PROJECT CATEGORY:
Traffic Improvements
Planning
LOCATION MAP Al _N_
I
I
CITYWIDE
AGENCY:
Public Works
CITY OF SANTA ANA FY 26/27CIP
CAPITAL IMPROVEMENT PROJECT WORKSHEET
-
PROJECT DESCRIPTION: PROJECT NEED:
Safe Routes to Parks plan will identify deficiencies and corresponding needed improvements on the walking and biking routes leading to and from parks.
This project is designed to increase traffic safety for all park users in the City when they walk or ride to or from City parks.
PROJECT COSTS FY 26/27
Planning 813,854
TOTAL 813,854
SOURCE OF FUNDS FY 26/27
SS4A 651,200
M2 LOCAL FAIRSHARE 162,654
TOTAL 813,854
DIVISION:
Traffic Engineering
FY 27/28 FY 28/29 FY 29/30 FY 30/31
FY 27/28 FY 28/29 FY 29/30 FY 30/31
CONTACT:
Zdenek Keku/a, Principal Civil Engineer
FY 31/32
FY 31/32
FY 32/33
FY 32/33
DATE:
27-Aug-2026
Exhibit 3
City Council 16 – 119 9/15/2026
Public Works Agency
www.santa-ana.gov/pw
Item # 17
City of Santa Ana
20 Civic Center Plaza, Santa Ana, CA 92701
Staff Report
September 15, 2026
TOPIC: Award Agreement with Gensler, Inc. to provide architectural design services for the Santa Ana Regional Transportation Center Bike Center Project
AGENDA TITLE
Agreement with Gensler, Inc. for Architectural Design Services for the Santa Ana Regional Transportation Center (SARTC) Bike Center Project (Project No. 25-6912) (Non-General Fund)
RECOMMENDED ACTION
1. Approve an appropriation adjustment recognizing Transit and Intercity Rail Capital Program (TIRCP) grant funding in the amount of $2,625,000 in the Select Street Construction, State Grant-Direct revenue account and appropriate the same amount into the Select Street Construction, Improvements Other Than Building expenditure account. (Requires five affirmative votes)
2. Authorize the City Manager to execute an agreement with Gensler, Inc. to provide architectural design services for the SARTC Bike Center in an amount not-to-exceed $107,600 for a one-year term beginning September 15, 2026 and expiring September 14, 2027 with provisions for four, one-year extensions (Agreement No. A-2026-XXX).
GOVERNMENT CODE §84308 APPLIES: Yes
DISCUSSION
The Santa Ana Regional Transportation Center (SARTC) Bike Center Project (Project) was developed to improve first- and last-mile connectivity by providing secure bicycle facilities for residents and commuters accessing regional transit services at the Santa Ana Regional Transportation Center. In January 2018, the City received a $1.25 million State Bicycle Corridor Improvement Program (BCIP) grant that is administered by the Orange County Transportation Authority (OCTA) for the design and construction of the SARTC Bike Center Project. The Project was originally included in the Fiscal Year 2018-19 Capital Improvement Program and proposed a secure indoor bicycle storage facility and supporting amenities plus the installation of 2,500 bicycle racks throughout City Council 17 – 1 9/15/2026
Award Agreement with Gensler, Inc. to provide architectural design services for the Santa Ana Regional Transportation Center Bike Center Project
September 15, 2026
the City. The project is intended to expand bicycle infrastructure and improve connections between bicycle travel and other transportation options.
On August 21, 2018, the City retained Gensler, Inc. to provide architectural design services for the Bike Center Project under an agreement not to exceed $149,000. After completing the design, the project was advertised for construction bids on May 25, 2021. The lowest responsive bid exceeded available funds by approximately $400,000.
To reduce construction costs, Staff revised the project scope by reducing the number of proposed bicycle racks from 2,500 to 1,500 and eliminating the restrooms and storage room from the SARTC Bike Center. The revised project was re-advertised for construction bids on July 11, 2022; however, the lowest responsive bid again exceeded available funds by approximately $500,000. Following the second unsuccessful bid solicitation, the City deferred the Project to evaluate funding and project delivery options.
In February 2023, City staff began working with OCTA staff to review the project scope and pursue alternative funding opportunities for the Project. As a result, a project scope change was approved in January 2024 which separated the bike rack improvements from the SARTC Bike Center improvements which allowed the City to pursue additional funding for the improvements at SARTC.
On May 15, 2026, the City was awarded a $2,625,000 Transit and Intercity Rail Capital Program (TIRCP) grant to construct the revised SARTC Bike Center Project. These grant funds are part of a regional grant received and administered by OCTA. The grant funds both updates to the project's design construction documents as well as the construction phase.
Subsequently, in July 2026 the citywide bike rack component of the project was formally canceled from the BCIP Program due to high cost and unavailability of grant funds.
The revised Bike Center Project scope includes construction of a secure indoor bicycle storage facility with lockers and a community bicycle workspace. The facility will provide secure bicycle storage and supporting amenities for SARTC users, improving first- and last -mile bicycle access and connectivity to regional transit services fully funded by the TIRCP grant.
The original SARTC Bike Center plans prepared by Gensler need to be updated to reflect the new scope of work as well as to comply with the current 2025 California Building Standards Code, as the original design documents were prepared under a previous edition of the code. Public Works staff coordinated with Planning and Building Agency staff and determined that an in-house design approach was not feasible because the City does not have staff with the specialized design experience necessary to perform the required design updates. Additionally, modifying construction documents City Council 17 – 2 9/15/2026
Award Agreement with Gensler, Inc. to provide architectural design services for the Santa Ana Regional Transportation Center Bike Center Project
September 15, 2026
prepared by another design firm would require the City to assume responsibility for those revisions.
Because Gensler prepared the original construction documents, the firm possesses direct knowledge of the Project’s design and is best positioned to efficiently complete the required revisions. Assigning the work to another firm would require substantial review of the existing documents and assumption of design responsibility, resulting in duplicative effort, additional costs, and potential project delays. City staff consulted with the grant agencies and confirmed that retaining the original design firm is acceptable under the applicable grant requirements. The procurement was also conducted in accordance with the City’s applicable procurement requirements.
Approval of the proposed agreement with Gensler, Inc. will allow the consultant to revise the construction drawings and specifications to comply with the 2025 California Building Standards Code and advance the SARTC Bike Center project toward construction. TIRCP grant funds will be used to fund this design work, with the remaining funds available for project construction. Upon completion of the document updates and required permitting, staff anticipates advertising the Bike Center Project for construction bids and returning to the City Council for award of a construction contract utilizing the balance of the TIRCP grant funds.
ENVIRONMENTAL IMPACT
There is no environmental impact associated with this action.
FISCAL IMPACT
With the approval of the requested appropriation adjustments, all funds will be available for expenditure in Fiscal Year 2026-2027. Any remaining balances not expended at the end of the fiscal year will be presented to City Council for approval of carryovers into Fiscal Year 2027-2028. Subsequent fiscal year funding will be included in the proposed budgets for City Council consideration.
With the approval of the requested appropriation adjustment, $2,625,000 in TIRCP grant funds will be recognized in the Select Street Construction, State Grant-Direct revenue account (No. 05917002-52025) and appropriated for spending into the Select Street Construction, Improvements Other Than Building Account (No. 05917660- 66220).
Approval of the requests to reallocate funds will provide a total of $31,000 in unspent funds from Project 23-6905.
City Council 17 – 3 9/15/2026
Award Agreement with Gensler, Inc. to provide architectural design services for the Santa Ana Regional Transportation Center Bike Center Project
September 15, 2026
Fiscal
Year
Accounting
Unit – Account
No.
(Project No.)
Fund
Description
Accounting Unit,
Account Description Amount
APPROPRIATION ADJUSTMENT
2026-27 05917660-66220
(25-6912)
Select Street
Construction
Select Street
Construction,
Improvements Other
Than Buildings
$2,625,000
REALLOCATION
2026-27 03217662-66220
(From 26-6905)
Measure M –
Street
Construction
Measure M2 Local
Fairshare,
Improvements Other
Than Buildings
$31,000
TOTAL $2,656,000
EXHIBIT(S)
1. Agreement with Gensler
Submitted By: Rodolfo Rosas, P.E., Acting Executive Director of Public Works Approved By: Alvaro Nuñez, City Manager
City Council 17 – 4 9/15/2026
AGREEMENT WITH GENSLER INC. FOR ARCHITECTURAL DESIGN AND
CONSTRUCTION ADMINISTRATION SERVICES
THIS AGREEMENT is made and entered into on this 15th day of September, 2026 by and between Gensler, Inc. (“Consultant”), and the City of Santa Ana, a charter city and municipal corporation organized and existing under the Constitution and laws of the State of California (“City”).
RECITALS
A. The City desires to retain a Consultant having special skill and knowledge in the field of architectural design and construction administration services, specific to City’s Bike Center Project.
B. Consultant was previously retained by City to provide architectural design and construction administration services for the Bike Center Project under Agreement A-2018-201.
Consultant provided a completed design, but the Project did not proceed due to lack of available funding.
C. City has identified and secured alternative funding for the Bike Center Project. Due to timing, the previously prepared design documents will need to be updated to comply with 2025 California Building Standards Code.
D. Selection of Consultant for this task avoids the additional cost and time to complete new plans, as Consultant can update their prior designs to meet current Code. As required by the Santa Ana Municipal Code, the purchasing manager has approved an exception to process to award the instant Agreement to Consultant.
E. In undertaking the performance of this Agreement, Consultant represents that it is knowledgeable in its field and that any services performed by Consultant under this Agreement will be performed in compliance with such standards as may reasonably be expected from a professional consulting firm in the field.
NOW THEREFORE, in consideration of the mutual and respective promises, and subject to the terms and conditions hereinafter set forth, the parties agree as follows:
1. SCOPE OF SERVICES
Consultant shall perform during the term of this Agreement, the tasks and obligations including all labor, materials, tools, equipment, and incidental customary work required to fully and adequately complete the services described and set forth in Exhibit A, attached hereto and incorporated by reference.
2. COMPENSATION
a. City agrees to pay, and Consultant agrees to accept as total payment for its services for City, the rates and charges identified in Exhibit A. The total amount to be expended during the term of this Agreement shall not exceed $107,600, including any extension EXHIBIT 1
City Council 17 – 5 9/15/2026
periods.
b. Payment by City shall be made within forty-five (45) days following receipt of proper invoice evidencing work performed, subject to City accounting procedures. City and Consultant agree that all payments due and owing under this Agreement shall be made through Automated Clearing House (ACH) transfers. Consultant agrees to execute the City’s standard ACH Vendor Payment Authorization and provide required documentation. Upon verification of the data provided, the City will be authorized to deposit payments directly into Consultant’s account(s) with financial institutions.
Payment need not be made for work which fails to meet the standards of performance set forth in the Recitals which may reasonably be expected by City.
3. TERM
This Agreement shall commence on September 15, 2026, for a one (1) year term with the option for the City to grant up to a four (4), one-year extension(s), exercisable by a writing by the City Manager and the City Attorney, unless terminated earlier in accordance with Section 17, below.
4. PREVAILING WAGES
Consultant is aware of the requirements of California Labor Code Section 1720, et seq., and 1770, et seq., as well as California Code of Regulations, Title 8, Section 16000, et seq., (“Prevailing Wage Laws”), which require the payment of prevailing wage rates and the performance of other requirements on “public works” and “maintenance” projects. If the services being performed are part of an applicable “public works” or “maintenance” project, as defined by the Prevailing Wage Laws, and the total compensation is $1,000 or more, Consultant agrees to fully comply with such Prevailing Wage Laws. Consultant shall defend, indemnify and hold the City, its elected officials, officers, employees and agents free and harmless from any claim or liability arising out of any failure or alleged failure to comply with the Prevailing Wage Laws.
5. INDEPENDENT CONTRACTOR
Consultant shall, during the entire term of this Agreement, be construed to be an independent contractor and not an employee of the City. This Agreement is not intended nor shall it be construed to create an employer-employee relationship, a joint venture relationship, or to allow the City to exercise discretion or control over the professional manner in which Consultant performs the services which are the subject matter of this Agreement; however, the services to be provided by Consultant shall be provided in a manner consistent with all applicable standards and regulations governing such services. Consultant shall pay all salaries and wages, employer's social security taxes, unemployment insurance and similar taxes relating to employees and shall be responsible for all applicable withholding taxes.
6. OWNERSHIP OF MATERIALS
This Agreement creates a non-exclusive and perpetual license for City to copy, use, EXHIBIT 1
City Council 17 – 6 9/15/2026
modify, reuse, or sublicense any and all copyrights, designs, and other intellectual property embodied in plans, specifications, studies, drawings, estimates, and other documents or works of authorship fixed in any tangible medium of expression, including but not limited to, physical drawings or data magnetically or otherwise recorded on computer diskettes, which are prepared or caused to be prepared by Consultant under this Agreement (“Documents & Data”). Consultant shall require all subconsultants to agree in writing that City is granted a non-exclusive and perpetual license for any Documents & Data the subconsultant prepares under this Agreement.
Consultant represents and warrants that Consultant has the legal right to license any and all Documents & Data. Consultant makes no such representation and warranty in regard to Documents & Data which were provided to Consultant by the City. City shall not be limited in any way in its use of the Documents and Data at any time, provided that any such use not within the purposes intended by this Agreement shall be at City’s sole risk.
7. INSURANCE
Insurance requirements attached hereto as Exhibit B and incorporated by reference.
8. INDEMNIFICATION
Consultant agrees to defend, and shall indemnify and hold harmless the City, its officers, agents, employees, contractors, special counsel, and representatives from liability: (1) for personal injury, damages, just compensation, restitution, judicial or equitable relief arising out of claims for personal injury, including death, and claims for property damage, which may arise from the negligent operations of the Consultant, its subconsultants, agents, employees, or other persons acting on its behalf which relates to the services described in section 1 of this Agreement; and (2) from any claim that personal injury, damages, just compensation, restitution, judicial or equitable relief is due by reason of the terms of or effects arising from this Agreement. This indemnity and hold harmless agreement applies to all claims for damages, just compensation, restitution, judicial or equitable relief suffered, or alleged to have been suffered, by reason of the events referred to in this Section or by reason of the terms of, or effects, arising from this Agreement. The Consultant further agrees to indemnify, hold harmless, and pay all costs for the defense of the City, including fees and costs for special counsel to be selected by the City, regarding any action by a third party challenging the validity of this Agreement, or asserting that personal injury, damages, just compensation, restitution, judicial or equitable relief due to personal or property rights arises by reason of the terms of, or effects arising from this Agreement. City may make all reasonable decisions with respect to its representation in any legal proceeding. Notwithstanding the foregoing, to the extent Consultant’s services are subject to Civil Code Section 2782.8, the above indemnity shall be limited, to the extent required by Civil Code Section 2782.8, to claims that arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of the Consultant.
9. INTELLECTUAL PROPERTY INDEMNIFICATION
Consultant shall defend and indemnify the City, its officers, agents, representatives, and employees against any and all liability, including costs, for infringement of any United States’ letters patent, trademark, or copyright infringement, including costs, contained in the work product or documents provided by Consultant to the City pursuant to this Agreement.
EXHIBIT 1
City Council 17 – 7 9/15/2026
10. RECORDS
Consultant shall keep records and invoices in connection with the work to be performed under this Agreement. Consultant shall maintain complete and accurate records with respect to the costs incurred under this Agreement and any services, expenditures, and disbursements charged to the City for a minimum period of three (3) years, or for any longer period required by law, from the date of final payment to Consultant under this Agreement. All such records and invoices shall be clearly identifiable. Consultant shall allow a representative of the City to examine, audit, and make transcripts or copies of such records and any other documents created pursuant to this Agreement during regular business hours. Consultant shall allow inspection of all work, data, documents, proceedings, and activities related to this Agreement for a period of three (3) years from the date of final payment to Consultant under this Agreement.
11. CONFIDENTIALITY
If Consultant receives from the City information which due to the nature of such information is reasonably understood to be confidential and/or proprietary, Consultant agrees that it shall not use or disclose such information except in the performance of this Agreement, and further agrees to exercise the same degree of care it uses to protect its own information of like importance, but in no event less than reasonable care. “Confidential Information” shall include all nonpublic information. Confidential information includes not only written information, but also information transferred orally, visually, electronically, or by other means. Confidential information disclosed to either party by any subsidiary and/or agent of the other party is covered by this Agreement. The foregoing obligations of non-use and nondisclosure shall not apply to any information that (a) has been disclosed in publicly available sources; (b) is, through no fault of the Consultant disclosed in a publicly available source; (c) is in rightful possession of the Consultant without an obligation of confidentiality; (d) is required to be disclosed by operation of law; or (e) is independently developed by the Consultant without reference to information disclosed by the City.
12. CONFLICT OF INTEREST CLAUSE
a. The recipient or subrecipient must maintain written standards of conduct covering conflicts of interest and governing the actions of its employees engaged in the selection, award, and administration of contracts. No employee, officer, agent, or board member with a real or apparent conflict of interest may participate in the selection, award, or administration of a contract supported by the Federal award. A conflict of interest includes when the employee, officer, agent, or board member, any member of their immediate family, their partner, or an organization that employs or is about to employ any of the parties indicated herein, has a financial or other interest in or a tangible personal benefit from an entity considered for a contract. An employee, officer, agent, and board member of the recipient or subrecipient may neither solicit nor accept gratuities, favors, or anything of monetary value from Consultants. However, the recipient or subrecipient may set standards for situations where the financial interest is not substantial or a gift is an unsolicited item of nominal value. The recipient's or EXHIBIT 1
City Council 17 – 8 9/15/2026
subrecipient's standards of conduct must also provide for disciplinary actions to be applied for violations by its employees, officers, agents, or board members. b. If the recipient or subrecipient has a parent, affiliate, or subsidiary organization that is not a State, local government, or Indian Tribe, the recipient or subrecipient must also maintain written standards of conduct covering organizational conflicts of interest.
Organizational conflicts of interest mean that because of relationships with a parent company, affiliate, or subsidiary organization, the recipient or subrecipient is unable or appears to be unable to be impartial in conducting a procurement action involving a related organization.
c. Consultant covenants that it presently has no interests and shall not have interests, direct or indirect, which would conflict in any manner with performance of services specified under this Agreement.
d. No immediate family members of either the Mayor, City Council Member, or any appointed City Official, including appointed board and commission members, as defined under the City’s Municipal Code, whose position with the City shall award or influence the award of this Agreement, or any competing contract or amendment thereof, shall be employed in any capacity by the Consultant or have any other direct or indirect financial benefit or interest in this Agreement. e. The section also prohibits the awarding of any agreement, contract, grant, or any amendment to those awards, to any former full-time employee for one-year from date of employee separation except for any CalPERS retiree as authorized by City Council resolution
f. The Consultant must comply with all conflict of interest laws, ordinances, and regulations now in effect or hereafter to be enacted during the term of this Agreement.
The Consultant warrants that it is not now aware of any facts which conflict with the prohibitions defined above. If the Consultant hereafter becomes aware of any facts that might reasonably be expected to create a conflict of interest, it must immediately make full written disclosure of such facts to the City. Full written disclosure must include, but is not limited to, identification of all persons implicated and a complete description of all relevant circumstances. Failure to comply with the provisions of this paragraph will be a material breach of this Agreement.
g. Consultant covenants that none of its directors, officers, employees, or agents shall participate in selecting or administrating any subcontractsupported (in whole or in part) by City funds stemming from the Agreement where the awarding of the subcontract has any direct or indirect financial benefit or interest to any individual, as defined in subsections (d) and (e) above.
13. NON-DISCRIMINATION
EXHIBIT 1
City Council 17 – 9 9/15/2026
Consultant shall not discriminate because of race, color, creed, religion, sex, marital status, sexual orientation, gender identity, gender expression, gender, medical conditions, genetic information, or military and veteran status, age, national origin, ancestry, or disability, as defined and prohibited by applicable law, in the recruitment, selection, teaching, training, utilization, promotion, termination or other employment related activities or any services provided under this Agreement. Consultant affirms that it is an equal opportunity employer and shall comply with all applicable federal, state and local laws and regulations.
14. EXCLUSIVITY AND AMENDMENT
This Agreement represents the complete and exclusive statement between the City and Consultant, and supersedes any and all other agreements, oral or written, between the parties. In the event of a conflict between the terms of this Agreement and any attachments hereto, the terms of this Agreement shall prevail. This Agreement may not be modified except by written instrument signed by the City and by an authorized representative of Consultant. The parties agree that any terms or conditions of any purchase order or other instrument that are inconsistent with, or in addition to, the terms and conditions hereof, shall not bind or obligate Consultant or the City. Each party to this Agreement acknowledges that no representations, inducements, promises or agreements, orally or otherwise, have been made by any party, or anyone acting on behalf of any party, which is not embodied herein.
15. ASSIGNMENT
Inasmuch as this Agreement is intended to secure the specialized services of Consultant, Consultant may not assign, transfer, delegate, or subcontract any interest herein without the prior written consent of the City and any such assignment, transfer, delegation or subcontract without the City's prior written consent shall be considered null and void. Nothing in this Agreement shall be construed to limit the City’s ability to have any of the services which are the subject to this Agreement performed by City personnel or by other Consultants retained by City.
16. TERMINATION
This Agreement may be terminated by the City upon thirty (30) days written notice of termination. In such event, Consultant shall be entitled to receive and the City shall pay Consultant compensation for all services performed by Consultant prior to receipt of such notice of termination, subject to the following conditions:
a. As a condition of such payment, the Executive Director may require Consultant to deliver to the City all work product(s) completed as of such date, and in such case such work product shall be the property of the City unless prohibited by law, and Consultant consents to the City's use thereof for such purposes as the City deems appropriate.
b. Payment need not be made for work which fails to meet the standard of performance specified in the Recitals of this Agreement.
17. WAIVER
EXHIBIT 1
City Council 17 – 10 9/15/2026
No waiver of breach, failure of any condition, or any right or remedy contained in or granted by the provisions of this Agreement shall be effective unless it is in writing and signed by the party waiving the breach, failure, right or remedy. No waiver of any breach, failure or right, or remedy shall be deemed a waiver of any other breach, failure, right or remedy, whether or not similar, nor shall any waiver constitute a continuing waiver unless the writing so specifies.
18. JURISDICTION - VENUE
This Agreement has been executed and delivered in the State of California and the validity, interpretation, performance, and enforcement of any of the clauses of this Agreement shall be determined and governed by the laws of the State of California. Both parties further agree that Orange County, California, shall be the venue for any action or proceeding that may be brought or arise out of, in connection with or by reason of this Agreement.
19. PROFESSIONAL LICENSES
Consultant shall, throughout the term of this Agreement, maintain all necessary licenses, permits, approvals, waivers, and exemptions necessary for the provision of the services hereunder and required by the laws and regulations of the United States, the State of California, the City of Santa Ana and all other governmental agencies. Consultant shall notify the City immediately and in writing of its inability to obtain or maintain such permits, licenses, approvals, waivers, and exemptions. Said inability shall be cause for termination of this Agreement.
20. FEDERAL REGULATIONS
Gensler shall comply with all applicable contractual provisions required by the United States Office of Management and Budget (OMB), as set for the in 2 CRF Part 200, whether or not expressly set forth in this document, including but not limited to those provisions set forth below.
Notwithstanding, anything to the contrary herein, including without limitation , the language in this Agreement, the actual language contained in federal statutes, federal regulations, federally promulgated materials and state statutes, shall control in determining any obligations under federal law in the event of a conflict with any terms, language or provisions contained in this Agreement.
Gensler shall not perform any act, fail to perform any act, or refuse to comply with any requests, which would cause City to be in violation of the federal terms and conditions. a. Federal Regulations – Recipient must comply with the government cost principles, uniform administrative requirements and audit requirements for federal grant program housed within Title 2, Part 180 of the Code of Federal Regulations.
b. Debarment and Suspension – As required by Executive Orders 12549 and 12689, and 2 CFR §200.214 and codified in 2 CFR Part 200, Recipient must provide protection against waste, fraud, and abuse by debarring or suspending those persons deemed irresponsible in their dealings with the Federal government.
c. Audit Records – With respect to all matters covered by this agreement all records shall be EXHIBIT 1
City Council 17 – 11 9/15/2026
made available for audit and inspection by CITY, the grant agency and/or their duly authorized representatives for a period of three (3) years from the date of submission of the final expenditure report by the City of Santa Ana. For a period of three years after final delivery hereunder or until all claims related to this Agreement are finally settled, whichever is later, Recipient shall preserve and maintain all documents, papers and records relevant to the services provided in accordance with this Agreement, including the Attachments hereto. For the same time period, Recipient shall make said documents, papers and records available to City and the agency from which City received grant funds or their duly authorized representative(s), for examination, copying, or mechanical reproduction on or off the premises of Recipient, upon request during usual working hours.
d. Reports – Recipient shall provide to City all records and information requested by City for inclusion in quarterly reports and such other reports or records as City may be required to provide to the agency from which City received grant funds or other persons or agencies. e. Section 504 of the Rehabilitation Act of 1973 (Handicapped) – All recipients of federal funds must comply with Section 504 of the Rehabilitation Act of 1973 (The Act). Therefore, the federal funds recipient pursuant to the requirements of The Act hereby gives assurance that no otherwise qualified handicapped person shall, solely by reason of handicap be excluded from the participation in, be denied the benefits of or be subject to discrimination, including discrimination in employment, in any program or activity that receives or benefits from federal financial assistance. The Recipient agrees it will ensure that requirements of The Act shall be included in the agreements with and be binding on all of its contractors, subcontractors, assignees or successors.
f. Americans with Disabilities Act of 1990 – (ADA) Recipient must comply with all requirements of the Americans with Disabilities Act of 1990 (ADA), as applicable. g. Political Activity – None of the funds, materials, property, or services provided directly or indirectly under this agreement shall be used for any partisan political activity, or to further the election or defeat of any candidate for public office, or otherwise in violation of the provisions of the "Hatch Act".
h. No Lobbying – Recipient will comply with all applicable lobbying prohibitions and laws, including those found in the Byrd Anti-Lobbying Amendment (31 U.S.C. 1352, et seq.), and agrees that none of the funds provided under this award may be expended by the Recipient to pay any person to influence, or attempt to influence an officer or employee of any agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with any federal action concerning the award or renewal of any federal contract, grant, loan, or cooperative agreement.
i. Non-Discrimination and Equal Opportunity – Recipient will comply, and all its contractors (or subrecipients) will comply, with Title VI of the Civil Rights Act of 1964, as amended; Section 504 of the Rehabilitation Act of 1964, as amended; Subtitle A, Title II of the Americans with Disabilities Act (ADA) (1990); Title IX of the Education Amendments of 1972; the Age Discrimination Act of 1975, as amended; Drug Abuse Office and Treatment Act of 1972, as EXHIBIT 1
City Council 17 – 12 9/15/2026
amended; Comprehensive Alcohol Abuse and Alcoholism Prevention, Treatment and Rehabilitation Act of 1970, as amended; Section 523 and 527 of the Public Health Service Act of 1912, as amended; Title VIII of the Civil Rights Act of 1968, as amended; Department of Justice Non-Discrimination Regulations, 28 CFR Part 42, Subparts C, D, E, and G; and Department of Justice regulations on disability discrimination, 28 CFR Part 35 and 39. In the event a Federal or State court, Federal or State administrative agency, or the Recipient makes a finding of discrimination after a due process hearing on the grounds of race, color, religion, national origin, sex, or disability against a recipient of funds, the Recipient will forward a copy of the findings to CITY which will, in turn, submit the findings to the Office of Civil Rights, Office of Justice Programs, U.S. Department of Justice. If applicable, recipient will comply with the equal opportunity clause in 41 C.F.R. 60-1.4(b) in accordance with Executive Order 11246 as amended by Executive Order No. 11375.
j. Equal Employment Opportunity – Recipient will comply, and all its contractors (or subrecipients) will comply, with all requirements of the Executive Order 11246 of September 24, 1965, entitled “Equal Employment Opportunity,” as amended by Executive Order 11375 of October 13, 1967, and as supplemented in Department of Labor regulations (41 CFR chapter 60), as applicable.
k. Public Contracts Code – Recipient will comply, and all its contractors (or subrecipients) will comply, with all requirements of the California Public Contract Code Section 10295.3, as applicable.
l. Copeland “Anti-Kickback” Act – Recipient will comply, and all its contractors (or subrecipients) will comply, with all requirements of the Copeland “Anti-Kickback” Act (40 U.S.C. 3145) as supplemented in Department of Labor regulations (29 CFR Part 3), as applicable. m. Davis-Bacon Act – Recipient will comply, and all its contractors (or subrecipients) will comply, with all requirements of the Davis-Bacon Act (40 U.S.C. 3141-3144 and 3146-3148) as supplemented by Department of Labor regulations (29 CFR Part 5), as applicable. n. Work Hours and Safety – Recipient will comply, and all its contractors (or subrecipients) will comply, with all requirements of Sections 103 and 107 of the Contract Work Hours and Safety Standards Act (40 U.S.C. 3702 and 3704) as supplemented by Department of Labor regulations (29 CFR Part 5), as applicable.
o. Clean Air Act –
1. The Consultant agrees to comply with all applicable standards, orders or regulations issued pursuant to the Clean Air Act, as amended, 42 U.S.C. § 7401 et seq.
2. The Consultant agrees to report each violation to CITY and understands and agrees that the CITY will, in turn, report each violation as required to assure notification to the Federal Emergency Management Agency, and the appropriate Environmental Protection Agency Regional Office.
3. The Consultant agrees to include these requirements in each subcontract exceeding EXHIBIT 1
City Council 17 – 13 9/15/2026
$150,000 financed in whole or in part with Federal assistance provided by FEMA. p. Energy and Conservation – Recipient will comply, and all its contractors (or subrecipients) will comply, with all requirements of the Energy Policy and Conservation Act (42 U.S.C. 6201), as applicable.
q. Waste Disposal – Recipient will comply, and all its contractors (or subrecipients) will comply, with all requirements of Section 6002 of the Solid Waste Disposal Act, as amended by the Resource Conservation and Recovery Act, as applicable. r. Patent Rights – Recipient agrees that the Department of Homeland Security shall have the authority to seek patent rights for any process, product, invention or discovery developed and paid for with funding through this Agreement based on the requirements of 37 CFR§ 401 and any other implementing regulations, as applicable.
s. Copyright – Recipient may copyright any books, publications or other copyrightable materials developed in the course of or under this Agreement. However, the federal awarding agency, State Administrative Agency (SAA) and City reserve a royalty-free, non-exclusive, and irrevocable license to reproduce, publish or otherwise use, and to authorize others to use, for federal government, SAA and/or City purpose:
(1) the copyright in any work developed through this Agreement; and (2) any rights of copyright to which the subcontractor purchases ownership with support through this grant. The Federal government’s, SAA’s and City’s rights identified above must be conveyed to the publisher and the language of the publisher’s release form must ensure the preservation of these rights. t. Equal Employment in Construction Contracts – Pursuant to Equal Employment Opportunity requirements of 41 C.F.R. 60-1.4(b) in accordance with Executive Order 11246 as amended by Executive Order No. 11375, as to any construction contract thereunder, if applicable, during the performance of this contract, the Consultant agrees as follows:
(1) The Consultant will not discriminate against any employee or applicant for employment because of race, color, religion, sex, sexual orientation, gender identity, or national origin. The Consultant will take affirmative action to ensure that applicants are employed, and that employees are treated during employment without regard to their race, color, religion, sex, sexual orientation, gender identity, or national origin. Such action shall include, but not be limited to the following:
Employment, upgrading, demotion, or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship. The Consultant agrees to post in conspicuous places, available to employees and applicants for employment, notices to be provided setting forth the provisions of this nondiscrimination clause.
EXHIBIT 1
City Council 17 – 14 9/15/2026
(2) The Consultant will, in all solicitations or advertisements for employees placed by or on behalf of the Consultant, state that all qualified applicants will receive consideration for employment without regard to race, color, religion, sex, sexual orientation, gender identity, or national origin.
(3) The Consultant will not discharge or in any other manner discriminate against any employee or applicant for employment because such employee or applicant has inquired about, discussed, or disclosed the compensation of the employee or applicant or another employee or applicant. This provision shall not apply to instances in which an employee who has access to the compensation information of other employees or applicants as a part of such employee's essential job functions discloses the compensation of such other employees or applicants to individuals who do not otherwise have access to such information, unless such disclosure is in response to a formal complaint or charge, in furtherance of an investigation, proceeding, hearing, or action, including an investigation conducted by the employer, or is consistent with the Consultant's legal duty to furnish information. (4) The Consultant will send to each labor union or representative of workers with which he has a collective bargaining agreement or other contract or understanding, a notice to be provided advising the said labor union or workers' representatives of the Consultant's commitments under this section, and shall post copies of the notice in conspicuous places available to employees and applicants for employment. (5) The Consultant will comply with all provisions of Executive Order 11246 of September 24, 1965, and of the rules, regulations, and relevant orders of the Secretary of Labor.
(6) The Consultant will furnish all information and reports required by Executive Order 11246 of September 24, 1965, and by rules, regulations, and orders of the Secretary of Labor, or pursuant thereto, and will permit access to his books, records, and accounts by the administering agency and the Secretary of Labor for purposes of investigation to ascertain compliance with such rules, regulations, and orders. (7) In the event of the Consultant's noncompliance with the nondiscrimination clauses of this contract or with any of the said rules, regulations, or orders, this contract may be canceled, terminated, or suspended in whole or in part and the Consultant may be declared ineligible for further Government contracts or federally assisted construction contracts in accordance with procedures authorized in Executive Order 11246 of September 24, 1965, and such other sanctions may be imposed and remedies invoked as provided in Executive Order 11246 of September 24, 1965, or by rule, regulation, or order of the Secretary of Labor, or as otherwise provided by law.
(8) The Consultant will include the portion of the sentence immediately preceding paragraph (1) and the provisions of paragraphs (1) through (8) in every subcontract or purchase order unless exempted by rules, regulations, or orders of the Secretary EXHIBIT 1
City Council 17 – 15 9/15/2026
of Labor issued pursuant to section 204 of Executive Order 11246 of September 24, 1965, so that such provisions will be binding upon each subconsultant or vendor. The Consultant will take such action with respect to any subcontract or purchase order as the administering agency may direct as a means of enforcing such provisions, including sanctions for noncompliance.
u. Prohibition on Certain Telecommunications and Video Surveillance Services or Equipment – Recipient will comply, and all its contractors (or subrecipients) will comply, with all requirements under Uniform Guidance 2 CFR §200.216. Recipient will comply with FEMA Policy 405-143-1, Prohibitions on Expending FEMA Award Funds on Covered Telecommunications Equipment or Services (Interim), which prohibits grant recipients and subrecipients from obligating or expending loan or grant funds to procure or obtain, extend or renew a contract to procure or obtain, or to enter into a contract (or extend or renew a contract) to procure or obtain equipment, services, or systems that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system.
As described in Public Law 115-232, section 889, covered telecommunications equipment:
(1) Telecommunications equipment produced by Huawei Technologies Company or ZTE Corporation (or any subsidiary or affiliate of such entities). (2) For the purpose of public safety, security of government facilities, physical security surveillance of critical infrastructure, and other national security purposes, video surveillance and telecommunications equipment produced by Hytera Communications Corporation, Hangzhou Hikvision Digital Technology Company, or Dahua Technology Company (or any subsidiary or affiliate of such entities).
(3) Telecommunications or video surveillance services produced by such entities or using such equipment.
(4) Telecommunications or video surveillance equipment or services produced or provided by an entity that the Secretary of Defense, in consultation with the Director of the National Intelligence or the Director of the Federal Bureau of Investigation, reasonably believes to be an entity owned or controlled by, or otherwise connected to, the government of a covered foreign country. v. Domestic Preferences for Procurements/Subcontracts – Recipient will comply, and all its Consultants (or subrecipients) will comply, with all requirements under Uniform Guidance 2 CFR §200.322.
Recipient shall comply with the federal and recipient standards in the award of any subcontracts.
For purposes of this Agreement, subcontracts shall include but not be limited to purchase agreements, rental or lease agreements, third party agreements, consultant service contracts and construction subcontracts.
EXHIBIT 1
City Council 17 – 16 9/15/2026
Recipient shall ensure that the terms of this Agreement with the CITY are incorporated into all Subcontractor Agreements. The recipient shall submit all Subcontractor Agreements to the CITY for review prior to the release of any funds to the subcontractor. The recipient shall withhold funds to any subcontractor agency that fails to comply with the terms and conditions of this Agreement and their respective Subcontractor Agreement.
(1) Recovered Materials
Recipient shall make maximum use of products containing recovered materials that are EPA-designated items unless the product cannot be acquired competitively within a timeframe providing for compliance with the contract performance schedule; Meeting contract performance requirements; or at a reasonable price.
Information about this requirement, along with the list of EPA-designated items, is available at EPA’s Comprehensive Procurement Guidelines webpage:
https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program.
The Consultant also agrees to comply with all other applicable requirements of Section 6002 of the Solid Waste Disposal Act.
(2) Domestic Preference for Procurements
Recipient should, to the greatest extent practicable, provide a preference for the purchase, acquisition, or use of goods, products, or materials produced in the United States. This includes, but is not limited to iron, aluminum, steel, cement, and other manufactured products.
For purposes of this clause:
Produced in the United States means, for iron and steel products, that all manufacturing processes, from the initial melting stage through the application of coatings, occurred in the United States.
Manufactured products mean items and construction materials composed in whole or in part of non-ferrous metals such as aluminum; plastics and polymer-based products such as polyvinyl chloride pipe; aggregates such as concrete; glass, including optical fiber; and lumber.
w. Termination for Cause and Convenience – Should recipient fail for any reason to comply with the contractual obligations of this agreement within the time specified by this Agreement, the CITY reserves the right to terminate the Agreement, reserving all rights under state and federal law.
x. Contractual/Legal Remedies for Breach of Contract – Should recipient fail for any reason to comply with the contractual obligations of this Agreement and/or willfully, knowingly or negligently breach any term, condition or requirement of the agreement, City may impose EXHIBIT 1
City Council 17 – 17 9/15/2026
sanctions including but not limited to damages (liquidated damages and or penalties) and /or any other remedy available pursuant to the Agreement of the laws then in effect.
21. NOTICE
Any notice, tender, demand, delivery, or other communication pursuant to this Agreement shall be in writing and shall be deemed to be properly given if delivered in person or mailed by first class or certified mail, postage prepaid, or sent by fax or other telegraphic communication in the manner provided in this Section, to the following persons:
To City:
City Clerk
City of Santa Ana
20 Civic Center Plaza (M-30)
P.O. Box 1988
Santa Ana, CA 92702-1988
With courtesy copies to:
Executive Director, Public Works Agency
City of Santa Ana
20 Civic Center Plaza (M-36)
P.O. Box 1988
Santa Ana, California 92702
To Consultant:
Gensler
Attention: Andrew P. Cohen, Executive Director
4675 MacArthur Ct #100
Newport Beach, CA 92660
A party may change its address by giving notice in writing to the other party. Thereafter, any communication shall be addressed and transmitted to the new address. If sent by mail, communication shall be effective or deemed to have been given three (3) days after it has been deposited in the United States mail, duly registered or certified, with postage prepaid, and addressed as set forth above. If sent by fax, communication shall be effective or deemed to have been given twenty-four (24) hours after the time set forth on the transmission report issued by the transmitting facsimile machine, addressed as set forth above. For purposes of calculating these time frames, weekends, federal, state, County or City holidays shall be excluded.
23. MISCELLANEOUS PROVISIONS
a. Each undersigned represents and warrants that its signature herein below has the power, authority and right to bind their respective parties to each of the terms of this Agreement, and shall indemnify City fully, including reasonable costs and EXHIBIT 1
City Council 17 – 18 9/15/2026
attorney’s fees, for any injuries or damages to City in the event that such authority or power is not, in fact, held by the signatory or is withdrawn. b. All Exhibits referenced herein and attached hereto shall be incorporated as if fully set forth in the body of this Agreement.
IN WITNESS WHEREOF, the parties hereto have executed this Agreement the date and year first above written.
ATTEST: CITY OF SANTA ANA
JENNIFER L. HALL ALVARO NUÑEZ
City Clerk City Manager
APPROVED AS TO FORM: CONSULTANT:
SONIA R. CARVALHO
City Attorney
By:
Kyle Nellesen By:
Assistant City Attorney Title:
RECOMMENDED FOR APPROVAL:
Rodolfo Rosas, P.E.
Active Executive Director
Public Works Agency
Nicholas Acevedo
Principal
EXHIBIT 1
Rodolfo Rosas (Sep 3, 2026 09:17:57 PDT)
Rodolfo Rosas
City Council 17 – 19 9/15/2026
EXHIBIT A
EXHIBIT 1
City Council 17 – 20 9/15/2026
Gensler LOA – Architecture
January 2021
May 15, 2026
David Sierra
CIP Engineering
City of Santa Ana
20 Civic Center Plaza, Santa Ana, CA 92701
For City of Santa Ana
Fee Proposal for Bike Station at Santa Ana Regional Transportation Center Subject: Agreement for Architectural Services
Gensler Project Number: 007.3556.500
Dear Mr. Sierra:
This Agreement is between City of Santa Ana (“Client”) and M. Arthur Gensler Jr. & Associates, Inc (“Gensler”), located at 4675 MacArthur Court, Newport Beach, CA 92660, Suite 100, for architectural services.
A. PROJECT
A.1 Project Description. This project involves the new interior build out of an approximately 1,200 square foot space for a secured indoor bicycle storage, and community bicycle workshop located on the ground floor of the existing parking structure located at 625 North Santiago Street, Santa Ana, CA 92701. (the “Project”).
A.2 Project Budget. Client will provide and Gensler will review Client’s overall project and construction budget goals for the Project (the “Project Budget”) prior to the commencement of services. Gensler understands current budget as being set at $1,000,000. The Project Budget will include appropriate amounts for design and construction contingencies, consistent with the nature of the Project. During design, Gensler will provide estimates of the Construction Cost at beginning kick off phase and at construction documents design phase, including contingency amounts commensurate with the stage of design evolution and the nature of the Project. Client and Gensler will review such cost estimates and Client will adjust it to reflect changes in the program requirements, design, and level of design detail, or adjust the program, to the extent required for consistency with the Project Budget. Unless it would otherwise be an Optional/Additional Service (as defined in Section B.3 below). Gensler will incorporate any agreed upon changes in the subsequent design phase as part of its Basic Services (as defined in Section B.1 below).
A.3 Project Schedule. The project schedule of important milestones (“Schedule”) is set forth below. The Project will proceed in accordance with the Schedule. The partieswill monitor the Project for conformance with the Schedule. If Client directs Gensler to provide Additional Services requiring additional time or the Project is not proceeding in accordance with the Schedule due to factors beyond Gensler’s reasonable EXHIBIT 1
City Council 17 – 21 9/15/2026
Agreement for Architectural Services
March 17, 2025
Gensler LOA- Architecture
January 2021
control, Gensler and Client will adjust the Schedule as appropriate, consistent with Section B.3, Optional/Additional Services. The Schedule will consist of the following presently projected milestones:
Proposed Schedule
A. Estimated Commencement June 2026
B. Design Stages
a. Drawing Update 2 weeks
i. City Review 2 weeks
b. 100% Permitting Estimated 8 weeks
c. Bidding Prior to end of 2026
C. Construction Stage Estimated 16 weeks, to be completed prior to summer 2027 B. SCOPE OF SERVICES PROVIDED BY GENSLER
Client and Gensler will each provide the names of their key Project team members, including the primary contact person and the person authorized to make decisions. Meetings and Site Visits may be conducted by telephonic, videoconference, or other remote means.
Project Scope Information from RFP provided by Client
B.1 Gensler’s Basic Services
Gensler’s Basic Services include architectural support services for preparation of demolition documentation for the removal of the project.
Gensler’s fee for Basic Services is based upon (among other things) the information in Section A, including the Project Budget and Schedule, and the scope of services in Section B. Changes in Project Budget, Schedule, or scope may result in Additional Services, consistent with Section B.3.
Gensler will engage sub-consultants for the following: Civil Engineering, Structural Engineering, Mechanical Engineering, Electrical Engineering, Plumbing Engineering, Landscape Design, Cost estimating
Client is to provide design services for the following building systems or components: Temporary supports and structures, Energy modeling, Parking Consultant, Accessibility Consultant (CASP Certification), AV/IT/Security Consultant, Technology Consultant, Acoustic Consultant, Exterior Envelope and Waterproofing Consultant, LEED Consulting, Specification Consultant, Geo-technical Engineer, Site Surveying (ALTA and topographical) Hazardous materials testing or abatement, art coordination, furniture, window washing, Environmental Information Consultant, Commissioning, Fire sprinkler, Fire Alarm, DAS Consultant, Commissioning, , and Dry Utility as required for the project.
Gensler will provide backgrounds of Gensler’s drawings to Client’s consultants, for coordination of the removal of project.
B.1.1 Kickoff
EXHIBIT 1
City Council 17 – 22 9/15/2026
Agreement for Architectural Services
March 17, 2025
Gensler LOA- Architecture
January 2021
B.1.1.1 Project Start-up/Kickoff. Upon Client’s authorization to proceed, key representatives of Client, Gensler, and appropriate consultants will meet to kick off the Project. The purpose of the meeting is to establish the parties’ mutual understanding of the Project objectives, schedule, budget, and delivery process.
B.1.1.2 Client-Provided Programming Information. Not applicable, programming completed and updated documentation based on scope writeup.
B.1.1.3 Data Collection. Client understands and agrees that Gensler may gather statistical data, analytics, trends and other aggregated or otherwise de-identified data derived from Gensler’s services to Client (“Aggregate Data”), and that Aggregate Data will be stored and processed by Gensler for general research purposes. Aggregate Data, as well as any resulting research, know-how, processes, algorithms or other methodology related to the Aggregate Data, shall remain Gensler’s property and will be considered Confidential Information under the Standard Terms and Conditions attached to this Agreement.
B.1.1.4 Existing Site Conditions. Gensler will review record documentation provided by Client of the existing site conditions, including: ALTA Survey, topographical survey, geotechnical report. Gensler will visit the Project site to verify reasonably observable conditions, including: site access, views, existing site conditions. If required, and approved by Client, Gensler may provide Additional Services to measure portions of the Project solely for the purpose of verifying certain conditions. Under certain circumstances, e.g., if the documentation of existing conditions is unavailable or appears to be unreliable, Gensler may recommend that Client engage the services of a surveyor to document the existing conditions before Gensler can proceed with further design services. Client acknowledges that demolition and site excavation can reveal pre-existing, hidden conditions, which may require Additional Services and/or modifications to the Program, Project Budget, and/or Project Schedule.
Gensler will prepare minutes documenting any Program adjustments, design decisions, and issues which the parties may agree to address at a later stage. Gensler will issue such minutes to the Client for review and approval. Client may request or Gensler may recommend further or separate design discovery meetings or other services as Additional Services.
B. 1.2 Design
B.1.2.1 Services will commence when Client has confirmed the Program and other initial information established in prior phase is accepted and directed Gensler to proceed accordingly.
B.1.2.2 Design Documents. Gensler will initiate and modify the previously dated documentation issued on May 13, 2022 Rebid set which was previously permitted under California Building Code 2016.
Gensler will work with consultants to revise documents for permitting under current code, which will include adding Alternate 01 and Alternate 02 from previous documents. In addition Gensler and consultants will be doing the following:
• Requested to provide an updated cost estimate based on the previous documents and then a cost estimate for the documents that are updated.
EXHIBIT 1
City Council 17 – 23 9/15/2026
Agreement for Architectural Services
March 17, 2025
Gensler LOA- Architecture
January 2021
Gensler will provide the documents in PDF. Client will be responsible for printed copies of the documents unless Client directs Gensler to produce such copies as a Reimbursable Expense, including a package for Client’s cost estimator to update the cost estimate, which will be provided to Gensler.
Gensler will meet with Client up to two (2) times to present and review the material, including the cost estimate prepared by cost estimator. Client and Gensler will agree upon any reasonable changes, consistent with the Program, and Gensler will incorporate such changes in the next phase, unless the changes would otherwise be an Optional/Additional Service (as defined in Section B.3 below). Meetings in this phase will include (1) Gensler personnel for up to 1 hours.
B.1.2.3. Permit Application / 100% Documents Gensler will assist Client in connection with filing a permit set required by governmental authorities having jurisdiction over the Project, as it relates to the issuance of a demolition permit. Client will be responsible for payment of all application fees and other expenses relating to the permit process.
B.1.3 Phase Three - Implementation
B.1.3.1 Bidding and Negotiation. Gensler will collaborate with client in preparation of bidding documents. Gensler will assist Client with questions regarding the Construction Documents. Gensler will meet with Client to discuss Client’s pricing and contracting strategies and selection of the key subcontractors. Gensler will attend up to One (1) meeting with Client and potential contractor.
B.1.3.1.1 Fast Track. Gensler’s standard practice requires the completion of the Construction Documents prior to bidding/awarding contracts to construct the project. Gensler has assumed no early works package for the project. If Client awards a construction contract for the Project or portions of the Project prior to completion of the Construction Documents outside this additional package, and/or if Client requests Gensler to issue separate Construction Documents packages for portions of the Project, Gensler’s services to prepare such packages will be provided as Additional Services.
B.1.3.2 Construction Administration. Gensler’s Construction Administration services will commence upon Client’s direction to Gensler to begin performing the services defined in this Section B.1.3 (such as submittal review) or upon the award of the Construction Contract (whichever is earlier) and will continue until thirty (30) days after Substantial Completion or Occupancy. The duration of Gensler’s Construction Administration services will not exceed the duration of time between the Commencement of Construction and thirty (30) days after Substantial Completion or Occupancy, as such duration is indicated in the Schedule. Gensler will provide Construction Administration services as set forth below and in AIA Document A201™–2017, General Conditions of the Contract for Construction, and mutually agreed upon Supplementary Conditions which Gensler will incorporate in the Project Manual, and all defined terms in this section shall have the same meaning as those in the General and Supplementary Conditions. If Client and Contractor modify the General and Supplementary Conditions, those modifications will not affect Gensler’s services under this Agreement unless Client and Gensler agree mutually to amend this Agreement.
EXHIBIT 1
City Council 17 – 24 9/15/2026
Agreement for Architectural Services
March 17, 2025
Gensler LOA- Architecture
January 2021
B.1.3.1. Pre-Construction Conference. Gensler will attend one (1) pre-construction conference with the Project team (Client, Contractor, Gensler, and each of their key subconsultants and subcontractors) to discuss the operational aspects of the Project, including the Construction Administration procedures.
B.1.3.2 Progress Meetings and Site Visits. Gensler will visit the Project site during construction to attend combined progress meetings and site walkthroughs (“Site Visit”) as often as is appropriate, in Gensler’s professional judgment, up to the extent specified in this section. The purpose of the site walkthroughs is to become generally familiar with the progress and quality of the Work and to determine whether the Work is in general conformance with the aesthetic design intent. Gensler’s fee for Basic Services includes: a total of four (4) progress meetings / site visits. If Gensler observes Work that does not conform to the Construction Documents, Gensler will recommend that Client reject it.
Gensler will also recommend inspection or testing of the Work if Gensler believes it is appropriate.
B.1.3.3 Communications during Construction. Client and Contractor will communicate with each other, and with Gensler’s consultants, through Gensler. Gensler will maintain logs of documents received, reviewed, and/or issued by Gensler.
B.1.3.4 Requests for Information. Upon Client’s or Contractor’s request for information, Gensler will provide written or graphic interpretations and clarifications of the Construction Documents.
B.1.3.5 Bulletins. Gensler will use its Bulletin form to: a) authorize minor changes in the Work; b) issue supplemental instructions related to the Work; c) confirm Field Orders; and d) request proposals for changes in the Work.
B.1.3.6 Submittals. Gensler will review and take appropriate action on Samples, Product Data, Shop Drawings, and other submittals that the Construction Documents require Contractor to submit (“Submittals”), to determine whether those items and Contractor’s proposed methods of fabrication are generally consistent with the aesthetic design intent. Gensler will take action on Submittals within the time specified in a submittal schedule to be provided by the Contractor and approved by Gensler, or otherwise within ten business days absent exigent circumstances. Gensler will conduct up to two reviews of Submittals as a Basic Service.
B.1.3.7 Changes. A reasonable amount of changes in the Work are typically anticipated and the Project Budget will include adequate contingencies for such changes. Gensler may authorize minor changes in the Work if they are consistent with the aesthetic design intent and do not involve an adjustment in the Project Budget (including contingencies) or Schedule. Gensler will assist Client in reviewing properly documented Change Order proposals submitted by Contractor and in issuing Change Order Directives requested by Client. In any event, Client will notify Gensler promptly of any Client-approved changes in the Work that deviate from the Construction Documents prepared by Gensler.
B.1.3.8 Contractor’s Payment Applications. Gensler will review Contractor’s monthly payment applications and make recommendations to Client regarding amounts due. Gensler’s approval of a payment application will represent to Client that, to the best of Gensler’s knowledge, information, and EXHIBIT 1
City Council 17 – 25 9/15/2026
Agreement for Architectural Services
March 17, 2025
Gensler LOA- Architecture
January 2021
belief, the Work has progressed to the point indicated and is consistent with the aesthetic design intent.
If Gensler is requested to issue Certificates for Payment, such certification will be made to the best of Gensler’s knowledge, information and belief, based on the documentation provided with the Contractor’s payment applications and Gensler’s site observations, and will be subject to: (1) Gensler’s observation of the Work upon Substantial Completion, (2) results of subsequent tests and inspections, (3) correction of minor deviations from the Contract Documents prior to completion, and (4) any qualifications expressed by Gensler. The issuance of a Certificate for Payment will not be a representation that Gensler has: (1) made exhaustive or continuous on-site inspections to check the quality or quantity of the Work, (2) reviewed construction means, methods, techniques, sequences or procedures, (3) reviewed copies of requisitions received from Subcontractors and material suppliers and other data requested by Client to substantiate the Contractor’s right to payment, or (4) ascertained how or for what purpose the Contractor has used money previously paid on account of the Contract Sum.
B.1.3.9 Substantial Completion. Upon receipt of Contractor’s written representation that the Work is substantially complete, along with Contractor’s punch list of items to be completed or corrected, Gensler will conduct one field review to observe whether the Work is substantially complete. When Gensler determines that the Work is substantially complete, Gensler will issue the Certificate of Substantial Completion.
B.1.3.10 Final Completion and Project Close-Out. No later than thirty (30) days following Substantial Completion, upon Contractor’s and Client’s request, Gensler will conduct one field review to observe Contractor’s completed punch list items. When Gensler believes that the Work has been sufficiently completed per the Construction Documents, Gensler will approve Contractor’s final payment application. Multiple or separate field reviews may be requested as an Additional Service.
B.2 CAD Format and Standards. Gensler and its consultants will use Revit and Gensler’s CAD Standards.
At the completion of the Project, Gensler will deliver electronic as-designed record files, consisting of Gensler’s Construction Documents and Bulletins, in PDF. Gensler will translate CAD files provided by Client and/or Client’s consultants as an Additional Service. Preparation/review of as-built construction drawings, including incorporating Contractor’s as-built record drawings into Gensler’s as-designed record files, may be requested by Client as an Additional Service.
B.3 Optional/Additional Services. Gensler will provide services beyond the Basic Services described in Section B.1 (“Additional Services”) if requested by Client and confirmed in writing by Gensler.
Additional Services include, but are not limited to:
a. Services required due to accelerated deadlines, delays, untimely Client information, approvals, or instructions, out-of-sequence phasing, Project pauses or remobilization, or other schedule changes due to reasons beyond Gensler’s reasonable control; b. Services required due to changes in: (i) the Program; (ii) previously provided Client information, approvals, or instructions; or (iii) federal, state, or local laws, or regulations (or their interpretation by the authority having jurisdiction);
c. Value engineering services required due to (i) absence of Project Budget at the commencement of Services; (ii) Project Budget changes after the Programming phase; (iii) new value engineering EXHIBIT 1
City Council 17 – 26 9/15/2026
Agreement for Architectural Services
March 17, 2025