LOS Peak Count Avg
# Intersection Jurisdiction Standard Hour Date Delay LOS 51 Lawrence Expressway and Kifer Road SCC E AM 03/07/18 54.8 D E PM 03/07/18 97.6 F
52 Lawrence Expressway and Reed Ave/Monroe St SCC E AM 03/07/18 114.8 F (CMP) E PM 11/13/18 61.8 E
53 Lawrence Expressway and Homestead Road SCC E AM 01/01/20 3 61.8 E (CMP) E PM 11/15/18 65.4 E
54 Lawrence Expressway and Pruneridge Avenue SCC E AM 01/01/20 3 74.5 E E PM 01/01/20 3 47.4 D
55 Bowers Avenue and Monroe Street SC D AM 10/30/19 31.7 C D PM 10/30/19 33.9 C
56 Bowers Ave/Kiely Boulevard and El Camino Real SC E AM 10/30/19 28.9 C (CMP) E PM 11/15/18 30.4 C
57 Kiely Boulevard and Benton Street SC D AM 05/16/19 34.0 C D PM 05/10/18 37.9 D
58 Kiely Boulevard and Homestead Road SC D AM 05/16/19 37.3 D D PM 05/10/18 41.6 D
Notes:
SCC = Santa Clara County, SC = Santa Clara, SJ = San Jose, SV = Sunnyvale Bold indicates a substandard level of service.
1. Traffic counts from 2018/2019 are lower than 2016 counts. Thus, 2020 traffic volumes were estimated by applying a 2% annual growth factor to 2016 counts.
3. Traffic counts from 2018/2019 are not available. Thus, 2020 traffic volumes were estimated by applying a 2% annual growth factor to 2017 counts.
2. Traffic counts from 2018/2019 are not available. Thus, 2020 traffic volumes were estimated by applying a 2% annual growth factor to 2014 counts.
Freedom Circle Focus Area Plan and Greystar General Plan Amendment TA December 22, 2021 Page | 35
3. Background Conditions
Background conditions reflect Year 2030 traffic conditions without the land use development envisioned under the proposed Greystar General Plan Amendment or the proposed Freedom Circle Focus Area Plan. This chapter describes background improvements assumed in the Year 2030 transportation network, the procedure used to forecast background traffic volumes, and the resulting traffic conditions.
Roadway Network Under Background Conditions
The Year 2030 forecasts produced using the CSC model reflect planned transportation improvements anticipated to occur by the Year 2030. Most notable is the planned BART extension into Silicon Valley.
The base year (2018) CSC model reflects BART service that terminated at the Warm Springs/South Fremont Station. In June 2020, BART service commenced on the Phase I extension from Warm Springs to Milpitas and Berryessa/North San José. The Phase II BART extension into downtown San José and Santa Clara is assumed to be complete by 2030.
VTA light rail service also was modified at the end of 2019. While the base year (2018) model assumed that LRT service between Old Ironsides Station and Milpitas would require a transfer, the 2030 model reflects the current LRT lines. The Orange Line now offers direct LRT service with 20-minute headways from the Old Ironsides Station to the Milpitas BART station as well as to the Moffett Park business park in Sunnyvale, Mountain View, and the Alum Rock area of San José. Furthermore, the Green Line now provides direct LRT service with 20-minute headways from the Old Ironsides Station to downtown San José and Campbell. LRT service between the Old Ironsides Station and South San José would require a transfer to the Blue Line.
In addition, the 2030 model assumes the existing carpool (HOV) lanes on US 101 will be converted to express lanes. Carpools with three or more occupants will be permitted to use the express lane free of charge, while vehicles with two or fewer occupants must pay a fee to access the express lane.
The transportation network under background conditions is assumed to include the following improvements at study intersections. The intersection improvements are planned CIP projects or improvements that will be fully funded by the Tasman East Specific Plan, City Place Phases 1, 2, and 3 developments, or the approved data center at 2305 Mission College. Figure 8 shows the lane configurations at the study intersections under background conditions.
Freedom Circle Focus Area Plan and Greystar General Plan Amendment TA December 22, 2021 Page | 39
10. Great America Parkway and SR 237 Westbound Ramps: restripe the southbound approach as one through/right-turn lane and one right-turn lane, add a second westbound rightturn lane and a third westbound left-turn lane and associated receiving lane under underpass.
11. Great America Parkway and SR 237 Eastbound Ramps: add a third southbound through lane and a second eastbound right-turn lane.
12. Great America Parkway and Great America Way: add a second westbound right-turn lane with an overlap phase and a second southbound left-turn lane.
13. Great America Parkway and Old Mountain View-Alviso Road: add a second eastbound left-turn lane.
15. Great America Parkway and Tasman Drive: add a southbound right-turn lane and a third westbound left-turn lane.
18. Great America Parkway and Mission College Boulevard: add a third northbound left-turn lane, a third westbound left-turn lane, a second eastbound left-turn lane, and a westbound rightturn pocket.
30. Juliette Lane and Mission College Boulevard: remove the north leg (i.e., southbound movements), the northbound through lane and the eastbound left-turn lane.
31. Burton Drive and Mission College Boulevard: restripe the northbound through/right-turn lane as a right-turn only lane.
39. Lick Mill Boulevard and Tasman Drive: reconfigure northbound and southbound approaches to include two left-turn lanes, one through lane, and one right-turn lane; change the northbound/southbound phasing from split to protected phasing; add a second westbound leftturn lane.
40. Lafayette Street and Calle De Luna: restripe the westbound approach to include one leftturn lane and one right-turn lane.
44. De la Cruz Boulevard and Central Expressway: add a third southbound through lane and a second southbound right-turn lane; add a second eastbound right-turn lane; add a third northbound left-turn lane and remove one northbound through lane.
45. Agnew Road/De La Cruz Boulevard and Montague Expressway: add a second northbound left-turn lane.
49. Trimble Road and Montague Expressway: construction of a flyover to serve westbound left turn traffic from Montague Expressway to southbound Trimble Road.
53. Lawrence Expressway and Homestead Road: add a third eastbound through lane and a third westbound through lane.
Background Traffic Volumes
Background traffic volumes were developed using the CSC travel demand forecasting model. In most locations, the model reflects anticipated growth according to ABAG 2030 land use projections. In the vicinity of the Focus Area, the model assumes completion of City Place Phases 1-3 and buildout of the Tasman East Specific Plan. For consistency, the trip estimates reported in the EIR for each of these developments was hard coded into the model. The proposed Kylli development is not assumed in 2030.
Freedom Circle Focus Area Plan and Greystar General Plan Amendment TA December 22, 2021 Page | 40
While the ABAG land use data do not reflect any growth in enrollment at Mission College from 2018 to 2030, the forecasts were modified to reflect a five percent increase in enrollment by the Year 2030 based on historic data obtained from the California Community Colleges Chancellor’s Office.3 Figure 9 shows the traffic volumes at the study intersections under background conditions.
Background (Year 2030) land uses within the Freedom Circle Focus Area assume the existing Marriott Hotel with 750 rooms is unchanged and a modest increase (approximately seven percent) in the size of other land uses based on ABAG land use forecasts. Overall, employment within the Focus Area under Background (Year 2030) No Project conditions is expected to be approximately six percent greater than under existing (Year 2018) conditions. The trip generation estimates for the Freedom Circle Focus Area under Background (2030) conditions account for trip reductions for transit use. Table 5 presents the CSC model trip estimates for the background no project conditions within the Focus Area.
Table 5
Trip Generation Estimates for the Freedom Circle Focus Area – Background (2030) Conditions Background Intersection Levels of Service
The results of the intersection level of service analysis show that the following 16 study intersections would operate at an unacceptable level of service (LOS E or worse for any San José intersection and locally controlled Santa Clara and Sunnyvale intersections and LOS F for CMP and expressway intersections in Santa Clara and Sunnyvale) during at least one peak hour under background conditions (see Table 6).
4. Lawrence Expressway and US101 Southbound Ramps (PM peak hour)
5. Lawrence Expressway and E. Arques Avenue (PM peak hour)
17. Great America Parkway and Patrick Henry Drive (PM peak hour)
23. Bowers Avenue and Central Expressway (AM and PM peak hours)
32. Mission College Boulevard and Montague Expressway (AM peak hour)
35. San Tomas Expressway and El Camino Real (AM peak hour)
42. Scott Street and Central Expressway (PM peak hour)
44. De La Cruz Boulevard and Central Expressway (AM peak hour)
45. Agnew Road/De La Cruz Boulevard and Montague Expressway (AM and PM peak hours)
47. N. 1st Street and Montague Expressway (AM and PM peak hours)
48. Zanker Road and Montague Expressway (AM and PM Peak hours)
49. Trimble Rd and Montague Expressway (PM peak hour)
50. McCarthy Boulevard/O’Toole Avenue and Montague Expressway (AM and PM peak hours)
3 https://datamart.cccco.edu/Students/Enrollment_Status.aspx Mode Mode Mode
Rate Trips Share Rate In Out Total Share Rate In Out Total Share Total Project Trips 1
Employment2 6,119 jobs 2.95 18,070 100.0% 0.25 1,285 269 1,554 100.0% 0.32 560 1,414 1,974 100.0% Less External Public Transit Trips (705) 3.9% (50) (11) (61) 3.9% (20) (51) (71) 3.6% External Vehicle Trips 17,365 96.1% 1,235 258 1,493 96.1% 540 1,363 1,903 96.4% Daily AM Peak Hour PM Peak Hour
Vehicle Trips Vehicle Trips
2 Year 2030 land uses include the Marriott Hotel (750 rooms) and approximately 2,514,000 s.f. of other uses including a mix of office, research & development, and restaurant (which reflect a 7% growth above existing conditions based on ABAG land use forecasts). 1 For comparison purposes, project trip estimates listed above do not include external bike/walk trips forecast by the CSC model since ITE trip rates reflect only vehicle trips.
Freedom Circle Focus Area Plan and Greystar General Plan Amendment TA December 22, 2021 Page | 44
Table 6
Background Intersection Levels of Service
Existing
LOS Peak Avg Avg
# Intersection Jurisdiction Standard Hour Delay LOS Delay LOS 1 Lawrence Expressway and Tasman Drive SCC E AM 42.0 D 47.6 D (CMP) E PM 55.1 E 64.5 E
2 Lawrence Expwy and Sandia Av/Lakehaven Dr SCC E AM 63.4 E 64.3 E E PM 58.3 E 62.5 E
3 Lawrence Expressway and US 101 NB Ramps SCC E AM 10.0 B 11.6 B E PM 13.8 B 19.7 B
4 Lawrence Expressway and US 101 SB Ramps SCC E AM 6.6 A 7.2 A E PM 71.5 E 109.4 F
5 Lawrence Expressway and E. Arques Ave. SCC E AM 37.7 D 39.9 D (CMP) E PM 71.6 E 81.2 F
6 Patrick Henry Drive and Tasman Drive SC D AM 17.2 B 16.2 B D PM 17.7 B 18.0 B
7 Old Ironsides Drive and Tasman Drive SC D AM 6.4 A 5.5 A D PM 15.9 B 10.9 B
8 Old Ironsides Drive and Old Glory Lane SC D AM 3.6 A 3.9 A (Unsignalized) D PM 3.5 A 3.6 A
9 Old Ironsides Drive and Patrick Henry Drive SC D AM 0.8 A 0.9 A (Unsignalized) D PM 3.9 A 4.4 A
10 Great America Parkway and SR 237 WB Ramps SJ D AM 15.7 B 13.1 B (CMP) D PM 19.0 B 18.8 B
11 Great America Parkway and SR 237 EB Ramps SJ D AM 13.4 B 10.7 B (CMP) D PM 14.5 B 13.2 B
12 Great America Parkway and Great America Way SC D AM 23.6 C 22.1 C D PM 16.9 B 17.3 B
13 Great America Pkwy and Old Mt View-Alviso Rd SC D AM 19.4 B 22.2 C D PM 44.4 D 42.5 D
14 Great America Parkway and Bunker Hill Lane SC D AM 16.9 B 13.3 B D PM 29.8 C 29.5 C
15 Great America Parkway and Tasman Drive SC E AM 42.0 D 44.5 D (CMP) E PM 28.4 C 33.1 C
16 Great America Parkway and Old Glory Lane SC D AM 10.7 B 10.5 B D PM 16.9 B 13.3 B
17 Great America Parkway and Patrick Henry Drive SC D AM 29.6 C 27.4 C D PM 53.6 D 66.5 E
18 Great America Pkwy and Mission College Blvd SC E AM 44.8 D 36.9 D (CMP) E PM 42.6 D 40.4 D
19 Great America Pkwy and US 101 NB Off Ramp SC E AM 11.6 B 11.4 B (CMP) E PM 10.0 A 9.6 A
20 Bowers Avenue and US 101 SB Off Ramp SC E AM 13.2 B 11.9 B (CMP) E PM 7.6 A 10.9 B
21 Bowers Avenue and Augustine Drive SC D AM 21.3 C 26.0 C D PM 33.2 C 36.4 D
22 Bowers Avenue and Scott Boulevard SC E AM 40.5 D 49.6 D E PM 33.5 C 37.1 D
23 Bowers Avenue and Central Expressway SCC E AM 56.2 E 89.0 F E PM 53.8 D 103.6 F
24 Bowers Avenue and Kifer Road/Walsh Avenue SC D AM 31.2 C 36.0 D D PM 28.6 C 30.4 C
25 Mission College Loop and Mission College Blvd SC D AM 12.0 B 12.1 B D PM 25.6 C 25.2 C
Background (2030)
No Project
Freedom Circle Focus Area Plan and Greystar General Plan Amendment TA December 22, 2021 Page | 45
Table 6 (Continued)
Background Intersection Levels of Service
Existing
LOS Peak Avg Avg
# Intersection Jurisdiction Standard Hour Delay LOS Delay LOS 26 Marriott Dwy and Mission College Blvd SC D AM 13.0 B 11.8 B D PM 12.9 B 12.0 B
27 Freedom Circle W and Mission College Blvd SC D AM 12.3 B 11.0 B D PM 26.2 C 25.9 C
28 Agnew/Freedom Circle E & Mission College Blvd SC D AM 30.0 C 31.1 C D PM 31.8 C 31.5 C
29 Great America employee entrance and Agnew Rd SC D AM 3.9 A 3.6 A D PM 5.2 A 5.1 A
30 Juliette Lane and Mission College Boulevard SC D AM 19.8 B 13.5 B D PM 30.6 C 22.6 C
31 Burton Drive and Mission College Boulevard SC D AM 20.6 C 20.5 C D PM 19.1 B 18.8 B
32 Mission College Blvd and Montague Expwy SCC E AM 65.8 E 98.3 F (CMP) E PM 52.4 D 72.7 E
33 San Tomas Expressway and Scott Boulevard SCC E AM 30.8 C 79.0 E (CMP) E PM 50.7 D 56.7 E
34 San Tomas Expressway and Monroe Street SCC E AM 39.5 D 43.2 D (CMP) E PM 38.5 D 45.8 D
35 San Tomas Expressway and El Camino Real SCC E AM 72.6 E 85.5 F (CMP) E PM 71.3 E 74.5 E
36 Convention Center and Tasman Drive SC D AM 14.4 B 14.8 B D PM 14.8 B 15.5 B
37 Centennial Boulevard and Tasman Drive SC D AM 14.8 B 25.5 C D PM 17.5 B 27.3 C
38 Calle Del Sol and Tasman Drive SC D AM 14.6 B 21.8 C D PM 18.3 B 23.3 C
39 Lick Mill Boulevard and Tasman Drive SC D AM 27.5 C 41.3 D D PM 24.8 C 41.2 D
40 Lafayette Street and Calle De Luna SC D AM 13.1 B 23.2 C D PM 19.3 B 36.9 D
41 Lafayette Street and Agnew Road SC D AM 27.9 C 29.3 C D PM 29.9 C 51.0 D
42 Scott Boulevard and Central Expressway SCC E AM 41.8 D 67.6 E (CMP) E PM 64.9 E 109.5 F
43 Lafayette Street and Central Expressway SCC E AM 52.4 D 75.2 E (CMP) E PM 53.3 D 62.6 E
44 De la Cruz Boulevard and Central Expressway SCC E AM 96.8 F 107.2 F (CMP) E PM 32.8 C 70.3 E
45 Agnew Rd/De La Cruz Blvd and Montague Expwy SCC E AM 52.3 D 94.4 F (CMP) E PM 48.1 D 106.0 F
46 Lick Mill Boulevard and Montague Expressway SCC E AM 38.7 D 56.1 E E PM 28.4 C 52.1 D
47 N. 1st Street and Montague Expressway SCC D AM 87.3 F 132.6 F (CMP) D PM 69.9 E 121.4 F
48 Zanker Road and Montague Expressway SCC D AM 50.2 D 57.5 E (CMP) D PM 50.5 D 79.2 E
49 Trimble Road and Montague Expressway SCC D AM 36.3 D 36.5 D (CMP) D PM 46.7 D 105.7 F
50 McCarthy Blvd/O'Toole Av and Montague Expwy SCC D AM 41.8 D 75.9 E (CMP) D PM 82.3 F 134.0 F
Background (2030)
No Project
Freedom Circle Focus Area Plan and Greystar General Plan Amendment TA December 22, 2021 Page | 46
Table 6 (Continued)
Background Intersection Levels of Service
51. Lawrence Expressway and Kifer Road (AM and PM peak hours)
52. Lawrence Expressway and Monroe Street (AM peak hour)
58. Kiely Boulevard and Homestead Road (PM peak hour)
All other study intersections would operate at acceptable levels during both the AM and PM peak hours of traffic. The intersection levels of service calculation sheets are included in Appendix B.
Existing
LOS Peak Avg Avg
# Intersection Jurisdiction Standard Hour Delay LOS Delay LOS 51 Lawrence Expressway and Kifer Road SCC E AM 54.8 D 102.3 F E PM 97.6 F 181.3 F
52 Lawrence Expressway and Reed Ave/Monroe St SCC E AM 114.8 F 124.3 F (CMP) E PM 61.8 E 71.1 E
53 Lawrence Expressway and Homestead Road SCC E AM 61.8 E 51.7 D (CMP) E PM 65.4 E 69.4 E
54 Lawrence Expressway and Pruneridge Avenue SCC E AM 74.5 E 79.6 E E PM 47.4 D 62.6 E
55 Bowers Avenue and Monroe Street SC D AM 31.7 C 33.4 C D PM 33.9 C 40.7 D
56 Bowers Ave/Kiely Boulevard and El Camino Real SC E AM 28.9 C 28.9 C (CMP) E PM 30.4 C 31.8 C
57 Kiely Boulevard and Benton Street SC D AM 34.0 C 37.2 D D PM 37.9 D 46.1 D
58 Kiely Boulevard and Homestead Road SC D AM 37.3 D 38.6 D D PM 41.6 D 57.9 E
Notes:
SCC = Santa Clara County, SC = Santa Clara, SJ = San Jose, SV = Sunnyvale Bold indicates a substandard level of service.
Background (2030)
No Project
Freedom Circle Focus Area Plan and Greystar General Plan Amendment TA December 22, 2021 Page | 47
4. Background Plus Project Conditions
This chapter describes background plus project traffic conditions. Background plus project conditions were evaluated relative to background conditions in order to determine potential project impacts. This chapter analyzes the proposed Greystar development by itself as well as the full buildout of the Freedom Circle Focus Area, which includes the proposed Greystar development along with additional residential and office development on other sites within the Focus Area.
Roadway Network Under Background Plus Project Conditions The roadway network under background plus project conditions would be the same as the background roadway network as described in Chapter 3 at all study intersections.
Project Trip Estimates
The magnitude of traffic produced by a new development and the locations where that traffic would appear were estimated using a three-step process: (1) trip generation, (2) trip distribution, and (3) trip assignment. In determining project trip generation, the magnitude of traffic entering and exiting the site is estimated for the AM and PM peak hours. As part of the project trip distribution, an estimate is made of the directions to and from which the project trips would travel. In the project trip assignment, the project trips are assigned to specific streets and intersections. These procedures are described below.
Trip Generation
Vehicle trips generated by development of the Greystar General Plan Amendment and buildout of the Freedom Circle Focus Area were estimated using the trip rates for a general Urban/Suburban area published in the Institute of Transportation Engineers’ (ITE) Trip Generation Manual, 10th Edition (2017). For residential land uses, trips rates for “Multi-family Housing Mid-Rise” (Land Use 221) were used. As defined by the ITE, “mid-rise” multifamily housing are buildings that have between 3 and 10 floors. ITE trip rates for “General Office Building” (Land Use 710) were used for office uses, “Shopping Center” (Land Use 820) trip rates were used for retail uses, and “Hotel” (Land Use 310) trip rates were used for the existing Marriott hotel.
The Greystar site is currently vacant. The proposed Greystar development would construct 1,100 dwelling units and 2,000 square feet of retail space. As shown in Table 7, development of the Greystar project is estimated to generate 6,060 gross daily vehicle trips, 398 (104 inbound and 294 outbound) gross AM peak hour trips, and 492 (299 inbound and 193 outbound) gross PM peak hour trips.
Freedom Circle Focus Area Plan and Greystar General Plan Amendment TA December 22, 2021 Page | 48
Buildout of the Freedom Circle Focus Area including the Greystar development would result in a total of 3,600 dwelling units, 5,369,000 square feet office space4 , 2,000 square feet retail space, and 750 hotel
rooms within the Focus Area. As shown in Table 8, buildout of the Freedom Circle Focus Area is estimated to generate 78,224 gross daily trips, 7,879 (5,902 inbound and 1,977 outbound) gross AM peak hour trips, and 8,216 (2,188 inbound and 6,028 outbound) gross PM peak hour trips.
Table 7
Project Trip Generation Estimates (Year 2030) – Greystar Table 8
Project Trip Generation Estimates (Year 2030) – Focus Area Buildout Since the Freedom Circle Focus Area would include a mix of land uses, a portion of the trips generated by Focus Area developments will both begin and end within the Focus Area, also known as internal trips. Some trips to and from the Focus Area will also occur using alternative modes of travel like public transit. The Year 2030 CSC travel demand forecasting model was used to estimate trip reductions for internalization and transit usage under background conditions. Because the proposed Greystar project would be comprised primarily of residential uses with only a very small amount of retail space, internal trips within the Greystar site are estimated to comprise no more than 0.5 percent of all trips. With full 4 Size of existing developments (2,349,000 s.f.) plus ABAG projected growth (302,000 s.f.) plus previously approved developments (718,000 s.f.) plus additional development permitted under the Focus Area Plan (2,000,000 s.f.).
Land Use Rate Trips
Mode
Share Rate In Out Total
Mode
Share Rate In Out Total
Mode
Share
Multifamily Housing (Mid-Rise) 1,100 Dwelling Units 5.44 5,984 0.36 103 293 396 0.44 295 189 484 Retail 2,000 Square Feet 37.75 76 0.94 1 1 2 3.81 4 4 8 Total Proposed Project Trips 6,060 100.0% 104 294 398 100.0% 299 193 492 100.0% Less Internal Trips (28) 0.5% (1) (1) (2) 0.5% (1) (1) (2) 0.3% Less External Public Transit Trips (295) 4.9% (5) (16) (21) 5.3% (13) (9) (22) 4.5% Less Retail Passby Trips (15) 0.2% 000 0.0% (1) (1) (2) 0.4% External Vehicle Trips 5,722 94.4% 98 277 375 94.2% 284 182 466 94.7% Source: Trip rates from ITE Trip Generation Manual, 10th Edition, 2017. Internal and transit trip reductions derived from CSC travel demand model.
AM Peak Hour PM Peak Hour
Daily Trips Trips
Size
Land Use Rate Trips
Mode
Share Rate In Out Total
Mode
Share Rate In Out Total
Mode
Share
Multifamily Housing (Mid-Rise) 3,600 Dwelling Units 5.44 19,584 0.36 337 959 1,296 0.44 966 618 1,584 Total Residential Trips 3,600 Dwelling Units 5.44 19,584 0.36 337 959 1,296 0.44 966 618 1,584 General Office Building 5,369,000 Square Feet 9.740 52,294 1.16 5,356 872 6,228 1.15 988 5,186 6,174 Retail 2,000 Square Feet 37.75 76 0.94 1 1 2 3.81 4 4 8 Hotel 750 Rooms 8.36 6,270 0.47 208 145 353 0.60 230 220 450 Total Employment Trips 5,371,000 Square Feet 58,640 5,565 1,018 6,583 1,222 5,410 6,632 Total Proposed Project Trips 78,224 100.0% 5,902 1,977 7,879 100.0% 2,188 6,028 8,216 100.0% Less Internal Trips (3,088) 3.9% (68) (68) (136) 1.7% (134) (134) (268) 3.3% Less External Public Transit Trips (5,044) 6.4% (435) (176) (611) 7.8% (150) (369) (519) 6.3% Less Retail Passby Trips (17) 0.0% 00 0 0.0% (1) (1) (2) 0.0% External Vehicle Trips 70,075 89.6% 5,399 1,733 7,132 90.5% 1,903 5,524 7,427 90.4% Source: Trip rates from ITE Trip Generation Manual, 10th Edition, 2017. Internal and transit trip reductions derived from CSC travel demand model.
Size
AM Peak Hour PM Peak Hour
Daily Trips Trips
Freedom Circle Focus Area Plan and Greystar General Plan Amendment TA December 22, 2021 Page | 49
buildout of the Freedom Circle Focus Area, the CSC model estimates that approximately 3.9 percent of the daily trips, 1.7 percent of the AM peak hour trips, and 3.3 percent of the PM peak hour trips would be internal within the Focus Area. Internal trips are assumed to be made via an alternative mode such as walking or bicycling. Transit trips are estimated to comprise roughly 5 percent of all Greystar trips and 6 to 8 percent of all trips generated by buildout of the Freedom Circle Focus Area.
The project also includes retail uses, which attract some of their customers from people who are passing by the site as they head to their destination. These customers do not need to make a separate vehicle trip to come to the project site. Such vehicle trips are categorized as pass-by trips as they are not new trips generated on the roadway network and are credited from the project trip generation. The pass-by trip reduction for the retail land uses is assumed to be 25 percent for daily, AM and PM peak hours.
After applying the internal capture, transit, and pass-by reductions, the proposed Greystar development is expected to generate 5,722 net daily vehicle trips, 375 (98 inbound and 277 outbound) net AM peak hour trips, and 466 (284 inbound and 182 outbound) net PM peak hour trips under background plus project conditions. Buildout of the Freedom Circle Focus Area is expected to generate 70,075 net daily vehicle trips, 7,132 (5,399 inbound and 1,733 outbound) net AM peak hour trips, and 7,427 (1,903 inbound and 5,524 outbound) net PM peak hour trips under background plus project conditions.
Trip Distribution and Assignment
The net project trip estimates were hard coded into the CSC model, which was then used to determine the distribution and assignment of project trips. Note that the trip estimates presented in Table 8 do not include any credits for existing use trips because the CSC model inputs need to reflect the total vehicle trips generated by the Focus Area rather than the incremental increase in trips beyond the existing trip generation.
While the CSC model is capable of estimating gross traffic patterns, it does not accurately model turning movements at study intersections within and immediately adjacent to the Freedom Circle Focus Area. Thus, a more detailed model of the Freedom Circle Focus Area was created using the TRAFFIX software to refine the traffic forecasts for nearby study intersections on Great America Parkway and Mission College Boulevard. Likewise, forecasts also were refined at study intersections within the immediate vicinity of the Patrick Henry Drive Specific Plan Area to ensure the background plus project forecasts are consistent with the method used to develop cumulative (Year 2040) forecasts, which reflect the development of both Plan Areas. The TRAFFIX model represents the future land uses anticipated within the Freedom Circle Focus Area on a parcel level.
Background Plus Project Traffic Volumes
In addition to the new vehicle trips associated with developments within the Freedom Circle Focus Area, model forecasts under background plus project conditions also reflect changes in background no project trips not associated with the Focus Area. For example, the addition 2 million s.f. of additional office space along with the introduction of 3,600 residential units in an employment-rich area of northern Santa Clara are expected to cause changes in trip distribution patterns for background traffic, changes in the mode split choices of other travelers, and a diversion of some vehicles from one route to another in order to avoid the most congested routes and reduce travel time.
Figures 10 and 11 show the traffic volumes forecast under background plus project conditions for the proposed Greystar development alone, and for full buildout of the Freedom Circle Focus Area (including Greystar), respectively. Note that at some intersections, the CSC model shows that the Greystar project would result in modest decreases in traffic volumes in the peak commute direction and increases in trips in the off-peak direction. This is an expected response to the construction of the large
Freedom Circle Focus Area Plan and Greystar General Plan Amendment TA December 22, 2021 Page | 56
residential project in a major employment area, resulting in fewer workers commuting long distances from residential areas farther south.
Furthermore, while the model shows that the buildout of the Freedom Circle Focus Area would cause traffic volumes to increase at most locations, a few intersection turn movements are expected to see decreases in traffic volumes due to changes in travel patterns for other nearby land uses. For example, the buildout of the Freedom Circle Focus Area would add a substantial number of trips to northbound Great America Parkway south of Hichborn Drive causing trips for other nearby developments located farther north to divert to other routes resulting in a projected decrease in traffic on northbound Great America Parkway between Mission College Boulevard and Bunker Hill Lane.
Background Plus Project Intersection Levels of Service – Greystar The results of the intersection level of service analysis (see Table 9) show that following study intersections would continue to operate at unacceptable levels of service under background plus Greystar project conditions.
4. Lawrence Expressway and US101 Southbound Ramps (PM peak hour)
5. Lawrence Expressway and E. Arques Avenue (PM peak hour)
17. Great America Parkway and Patrick Henry Drive (PM peak hour)
23. Bowers Avenue and Central Expressway (AM and PM peak hours)
32. Mission College Boulevard and Montague Expressway (AM peak hour)
35. San Tomas Expressway and El Camino Real (AM peak hour)
42. Scott Boulevard and Central Expressway (PM peak hour)
44. De La Cruz Boulevard and Central Expressway (AM peak hour)
45. Agnew Road/De La Cruz Boulevard and Montague Expressway (AM and PM peak hours)
47. N. 1st Street and Montague Expressway (AM and PM peak hours)
48. Zanker Road and Montague Expressway (AM and PM Peak hours)
49. Trimble Rd and Montague Expressway (PM peak hour)
50. McCarthy Boulevard/O’Toole Avenue and Montague Expressway (AM and PM peak hours)
51. Lawrence Expressway and Kifer Road (AM and PM peak hours)
52. Lawrence Expressway and Reed Avenue/Monroe Street (AM peak hour)
58. Kiely Boulevard and Homestead Road (PM peak hour)
However, development of the Greystar project alone would not cause a four-second increase in the critical-movement delay and a one percent (0.01) increase in the V/C compared to background conditions at any of the study intersections. The level of service calculation sheets are included in Appendix B.
Freedom Circle Focus Area Plan and Greystar General Plan Amendment TA December 22, 2021 Page | 57
Table 9
Background Intersection Levels of Service - Greystar
Peak Avg Avg Incr. In Incr. In
# Intersection Hour Delay LOS Delay LOS Crit. Delay Crit. V/C 1 Lawrence Expressway and Tasman Drive AM 47.6 D 47.8 D 0.2 0.003 (CMP) PM 64.5 E 66.1 E 3.1 0.012
2 Lawrence Expwy and Sandia Av/Lakehaven Dr AM 64.3 E 64.4 E 0.0 0.000 PM 62.5 E 62.6 E 0.3 0.002
3 Lawrence Expressway and US 101 NB Ramps AM 11.6 B 11.7 B 0.2 0.005 PM 19.7 B 19.9 B 0.5 0.001
4 Lawrence Expressway and US 101 SB Ramps AM 7.2 A 7.2 A 0.0 -0.002 PM 109.4 F 107.8 F -2.9 0.001
5 Lawrence Expressway and E. Arques Ave. AM 39.9 D 40.1 D 0.1 0.000 (CMP) PM 81.2 F 81.5 F 1.0 0.006
6 Patrick Henry Drive and Tasman Drive AM 16.2 B 16.3 B 0.2 0.003 PM 18.0 B 18.1 B 0.1 0.002
7 Old Ironsides Drive and Tasman Drive AM 5.5 A 5.5 A 0.0 0.003 PM 10.9 B 10.9 B 0.0 0.003
8 Old Ironsides Drive and Old Glory Lane AM 3.9 A 3.9 A 0.0 -0.001 (Unsignalized) PM 3.6 A 3.5 A -0.1 0.000
9 Old Ironsides Drive and Patrick Henry Drive AM 0.9 A 0.8 A 0.0 -0.001 (Unsignalized) PM 4.4 A 4.5 A 0.1 0.013
10 Great America Parkway and SR 237 WB Ramps AM 13.1 B 13.1 B 0.0 0.001 (CMP) PM 18.8 B 18.7 B 0.0 -0.001
11 Great America Parkway and SR 237 EB Ramps AM 10.7 B 10.6 B -0.1 0.001 (CMP) PM 13.2 B 13.2 B 0.0 -0.004
12 Great America Parkway and Great America Way AM 22.1 C 22.1 C 0.0 0.000 PM 17.3 B 17.3 B 0.0 -0.002
13 Great America Pkwy and Old Mt View-Alviso Rd AM 22.2 C 22.1 C 0.0 0.001 PM 42.5 D 42.3 D -0.3 -0.009
14 Great America Parkway and Bunker Hill Lane AM 13.3 B 13.2 B -0.1 0.004 PM 29.5 C 29.3 C -0.2 -0.002
15 Great America Parkway and Tasman Drive AM 44.5 D 44.5 D 0.1 0.002 (CMP) PM 33.1 C 33.1 C 0.0 0.000
16 Great America Parkway and Old Glory Lane AM 10.5 B 10.5 B 0.0 0.004 PM 13.3 B 13.3 B 0.0 0.000
17 Great America Parkway and Patrick Henry Drive AM 27.4 C 27.3 C 0.0 0.002 PM 66.5 E 67.6 E 1.7 0.006
18 Great America Pkwy and Mission College Blvd AM 36.9 D 37.7 D 0.8 0.017 (CMP) PM 40.4 D 41.3 D 1.2 0.020
19 Great America Pkwy and US 101 NB Off Ramp AM 11.4 B 11.3 B -0.1 -0.004 (CMP) PM 9.6 A 9.6 A 0.0 0.000
20 Bowers Avenue and US 101 SB Off Ramp AM 11.9 B 11.7 B -0.1 0.007 (CMP) PM 10.9 B 11.7 B 0.8 0.010
21 Bowers Avenue and Augustine Drive AM 26.0 C 25.5 C -0.2 0.007 PM 36.4 D 36.5 D 0.2 0.004
22 Bowers Avenue and Scott Boulevard AM 49.6 D 53.5 D 11.5 0.048 (CMP) PM 37.1 D 37.1 D 0.1 0.004
23 Bowers Avenue and Central Expressway AM 89.0 F 90.9 F 2.4 0.008 (CMP) PM 103.6 F 104.0 F 0.1 0.000
Background (2030) Conditions
with Project
No Project Greystar Only
Freedom Circle Focus Area Plan and Greystar General Plan Amendment TA December 22, 2021 Page | 58
Table 9 (Continued)
Background Intersection Levels of Service – Greystar
Peak Avg Avg Incr. In Incr. In
# Intersection Hour Delay LOS Delay LOS Crit. Delay Crit. V/C 24 Bowers Avenue and Kifer Road/Walsh Avenue AM 36.0 D 36.1 D 0.1 0.001 PM 30.4 C 30.4 C 0.1 0.001
25 Mission College Loop and Mission College Blvd AM 12.1 B 12.2 B 0.0 0.001 PM 25.2 C 25.2 C 0.0 0.002
26 Marriott Dwy and Mission College Blvd AM 11.8 B 11.4 B -0.3 0.031 PM 12.0 B 11.8 B 0.0 0.002
27 Freedom Circle W and Mission College Blvd AM 11.0 B 12.5 B 1.7 0.036 PM 25.9 C 25.9 C 0.2 0.007
28 Agnew/Freedom Circle E & Mission College Blvd AM 31.1 C 31.9 C 6.0 -0.023 PM 31.5 C 36.4 D 5.2 0.068
29 Great America employee entrance and Agnew Rd AM 3.6 A 3.6 A 0.0 0.002 PM 5.1 A 5.1 A 0.0 -0.003
30 Juliette Lane and Mission College Boulevard AM 13.5 B 13.9 B -0.5 0.006 PM 22.6 C 22.0 C -0.1 0.007
31 Burton Drive and Mission College Boulevard AM 20.5 C 21.4 C 0.0 -0.002 PM 18.8 B 18.5 B 0.0 0.006
32 Mission College Blvd and Montague Expwy AM 98.3 F 80.0 F -0.4 0.006 (CMP) PM 72.7 E 52.7 D 0.9 0.030
33 San Tomas Expressway and Scott Boulevard AM 79.0 E 79.4 E 3.6 0.002 (CMP) PM 56.7 E 56.7 E 0.0 0.000
34 San Tomas Expressway and Monroe Street AM 43.2 D 43.2 D -0.1 0.000 (CMP) PM 45.8 D 46.2 D 0.6 0.003
35 San Tomas Expressway and El Camino Real AM 85.5 F 84.9 F -1.4 -0.003 (CMP) PM 74.5 E 74.4 E -0.4 -0.004
36 Convention Center and Tasman Drive AM 14.8 B 14.8 B 0.0 0.000 PM 15.5 B 15.5 B 0.0 0.000
37 Centennial Boulevard and Tasman Drive AM 25.5 C 25.6 C 0.0 0.000 PM 27.3 C 27.2 C -0.1 -0.002
38 Calle Del Sol and Tasman Drive AM 21.8 C 21.8 C -0.1 -0.001 PM 23.3 C 23.2 C 0.0 0.003
39 Lick Mill Boulevard and Tasman Drive AM 41.3 D 41.2 D 0.0 0.000 PM 41.2 D 41.4 D 0.3 0.004
40 Lafayette Street and Calle De Luna AM 23.2 C 23.1 C -0.2 -0.003 PM 36.9 D 35.9 D -2.0 -0.010
41 Lafayette Street and Agnew Road AM 29.3 C 29.8 C -1.4 0.014 PM 51.0 D 51.8 D 1.4 0.004
42 Scott Boulevard and Central Expressway AM 67.6 E 66.3 E -1.3 -0.002 (CMP) PM 109.5 F 109.7 F 0.8 0.001
43 Lafayette Street and Central Expressway AM 75.2 E 74.5 E -1.2 -0.002 (CMP) PM 62.6 E 62.7 E 0.2 0.004
44 De la Cruz Boulevard and Central Expressway AM 107.2 F 105.7 F -1.9 -0.003 (CMP) PM 70.3 E 73.6 E 5.6 0.007
45 Agnew Rd/De La Cruz Blvd and Montague Expwy AM 94.4 F 94.0 F -0.9 0.002 (CMP) PM 106.0 F 107.5 F 2.6 0.009
46 Lick Mill Boulevard and Montague Expressway AM 56.1 E 56.1 E 0.1 -0.001 PM 52.1 D 52.1 D -0.1 0.001
Background (2030) Conditions
with Project
No Project Greystar Only
Freedom Circle Focus Area Plan and Greystar General Plan Amendment TA December 22, 2021 Page | 59
Table 9 (Continued)
Background Intersection Levels of Service – Greystar
Peak Avg Avg Incr. In Incr. In
# Intersection Hour Delay LOS Delay LOS Crit. Delay Crit. V/C 47 N. 1st Street and Montague Expressway AM 132.6 F 132.5 F 0.0 0.000 (CMP) PM 121.4 F 123.3 F 2.5 0.005
48 Zanker Road and Montague Expressway AM 57.5 E 57.2 E -0.4 0.000 (CMP) PM 79.2 E 78.9 E -0.4 0.001
49 Trimble Road and Montague Expressway AM 36.5 D 36.5 D -0.2 -0.004 (CMP) PM 105.7 F 105.8 F -0.1 0.002
50 McCarthy Blvd/O'Toole Av and Montague Expwy AM 75.9 E 74.8 E -1.7 -0.004 (CMP) PM 134.0 F 133.8 F -2.5 -0.002
51 Lawrence Expressway and Kifer Road AM 102.3 F 102.9 F -0.7 -0.002 PM 181.3 F 184.8 F 6.0 0.009
52 Lawrence Expressway and Reed Ave/Monroe St AM 124.3 F 123.7 F -0.4 -0.001 (CMP) PM 71.1 E 71.6 E 1.1 0.004
53 Lawrence Expressway and Homestead Road AM 51.7 D 51.5 D -0.1 -0.006 (CMP) PM 69.4 E 69.8 E 0.1 0.000
54 Lawrence Expressway and Pruneridge Avenue AM 79.6 E 79.2 E 0.8 0.005 PM 62.6 E 65.1 E 2.3 0.007
55 Bowers Avenue and Monroe Street AM 33.4 C 33.2 C -0.2 -0.002 PM 40.7 D 40.7 D 0.0 0.000
56 Bowers Ave/Kiely Boulevard and El Camino Real AM 28.9 C 28.9 C 0.0 -0.001 (CMP) PM 31.8 C 31.6 C -0.4 -0.008
57 Kiely Boulevard and Benton Street AM 37.2 D 37.1 D 0.0 0.000 PM 46.1 D 46.3 D 0.2 0.002
58 Kiely Boulevard and Homestead Road AM 38.6 D 38.3 D 0.1 0.003 PM 57.9 E 56.1 E -3.7 -0.011
Notes:
Bold indicates a substandard level of service.
Background (2030) Conditions
with Project
No Project Greystar Only
Freedom Circle Focus Area Plan and Greystar General Plan Amendment TA December 22, 2021 Page | 60
Background Plus Project Intersection Levels of Service – Focus Area Buildout
The results of the intersection level of service analysis (see Table 10) show that buildout of the Freedom Circle Focus Area, including the proposed Greystar project, would cause adverse effects at the following 20 intersections:
2. Lawrence Expressway and Sandi Avenue/Lakehaven Drive (PM peak hour)
4. Lawrence Expressway and US 101 southbound ramps (PM peak hour)
5. Lawrence Expressway and Arques Avenue (PM peak hour)
17. Great America Parkway and Patrick Henry Drive (PM peak hour)
18. Great America Parkway and Mission College Boulevard (PM peak hour)
23. Bowers Avenue and Central Expressway (AM and PM peak hours)
27. Freedom Circle and Mission College Boulevard (AM and PM peak hours)
28. Agnew/Freedom Circle and Mission College Boulevard (PM peak hour)
32. Mission College Boulevard/Thomas Road and Montague Expressway (AM peak hour)
35. San Tomas Expressway and El Camino Real (AM and PM peak hours)
42. Scott Boulevard and Central Expressway (PM peak hour)
43. Lafayette Street and Central Expressway (AM peak hour)
44. De La Cruz Boulevard and Central Expressway (AM peak hour)
45. Agnew Road/De La Cruz Boulevard and Montague Expressway (AM peak hour)
47. N. 1st Street and Montague Expressway (AM peak hour)
48. Zanker Road and Montague Expressway (AM peak hour)
50. McCarthy Boulevard/O’Toole Avenue and Montague Expressway (AM peak hour)
54. Lawrence Expressway and Pruneridge Avenue (AM peak hour) The adverse effects and proposed improvements to alleviate the deficiencies are described below.
The following study intersections also would operate at unacceptable levels of service under background plus Focus Area buildout conditions.
33. San Tomas Expressway and Scott Boulevard (AM peak hour)
49. Trimble Road and Montague Expressway (PM peak hour)
51. Lawrence Expressway and Kifer Road (AM and PM peak hours)
52. Lawrence Expressway and Reed Avenue/Monroe Street (AM peak hour)
58. Kiely Boulevard and Homestead Road (PM peak hour)
However, since buildout of the Freedom Circle Focus Area would not cause the critical-movement delay at the above signalized intersections to increase by four or more seconds and the V/C to increase by one percent (0.01) or more compared to background conditions, the project would not have an adverse effect on the operation of those intersections. The level of service calculation sheets are included in Appendix C.
Adverse Effects and Recommended Improvements – Focus Area Buildout This section discusses the adverse effects identified under background plus project conditions with full buildout of the Freedom Circle Focus Area and proposed improvements to address the deficiencies under this scenario. As previously stated, adverse effects on intersection operations do not constitute significant impacts under CEQA.
Freedom Circle Focus Area Plan and Greystar General Plan Amendment TA December 22, 2021 Page | 61
Table 10
Background Intersection Levels of Service – Focus Area Buildout Incr. In Incr. In
Peak Avg Avg Crit. Crit. Avg
# Intersection Hour Delay LOS Delay LOS Delay V/C Delay LOS 1 Lawrence Expressway and Tasman Drive AM 47.6 D 46.8 D 0.4 0.006 (CMP) PM 64.5 E 68.2 E 8.2 0.048
2 Lawrence Expwy and Sandia Av/Lakehaven Dr AM 64.3 E 71.4 E 0.0 0.000 PM 62.5 E 191.0 F 286.5 0.542
3 Lawrence Expressway and US 101 NB Ramps AM 11.6 B 11.4 B -0.7 0.074 PM 19.7 B 36.5 D 29.1 0.085
4 Lawrence Expressway and US 101 SB Ramps AM 7.2 A 18.4 B 7.3 0.049 17.4 B PM 109.4 F 103.5 F -13.8 0.070 71.2 E
5 Lawrence Expressway and E. Arques Ave. AM 39.9 D 42.4 D 4.3 0.048 (CMP) PM 81.2 F 91.9 F 15.5 0.049
6 Patrick Henry Drive and Tasman Drive AM 16.2 B 14.8 B -0.3 -0.007 PM 18.0 B 18.8 B 2.4 0.037
7 Old Ironsides Drive and Tasman Drive AM 5.5 A 7.6 A 3.0 0.014 PM 10.9 B 13.0 B 1.0 0.010
8 Old Ironsides Drive and Old Glory Lane AM 3.9 A 1.8 A -2.1 -0.005 (Unsignalized) PM 3.6 A 4.3 A 0.8 0.038
9 Old Ironsides Drive and Patrick Henry Drive AM 0.9 A 2.6 A 1.7 0.142 (Unsignalized) PM 4.4 A 4.1 A -0.2 -0.058
10 Great America Parkway and SR 237 WB Ramps AM 13.1 B 13.2 B 0.0 0.020 (CMP) PM 18.8 B 19.1 B 0.7 0.015
11 Great America Parkway and SR 237 EB Ramps AM 10.7 B 10.7 B 0.1 0.006 (CMP) PM 13.2 B 12.6 B -0.6 0.041
12 Great America Parkway and Great America Way AM 22.1 C 21.8 C -0.3 0.038 PM 17.3 B 17.3 B 0.1 0.053
13 Great America Pkwy and Old Mt View-Alviso Rd AM 22.2 C 22.3 C -0.2 0.058 PM 42.5 D 39.3 D -4.5 0.034
14 Great America Parkway and Bunker Hill Lane AM 13.3 B 13.0 B -0.6 0.066 PM 29.5 C 28.6 C -0.6 0.076
15 Great America Parkway and Tasman Drive AM 44.5 D 45.3 D 0.6 0.070 (CMP) PM 33.1 C 36.0 D 7.7 0.063
16 Great America Parkway and Old Glory Lane AM 10.5 B 12.6 B 0.2 0.196 PM 13.3 B 15.3 B 4.0 0.018
17 Great America Parkway and Patrick Henry Drive AM 27.4 C 37.2 D 5.6 0.137 25.2 C PM 66.5 E 89.7 F 15.6 0.035 67.2 E
18 Great America Pkwy and Mission College Blvd AM 37.1 D 54.7 D 21.2 0.264 47.1 D (CMP) PM 40.4 D 204.5 F 288.9 0.469 61.5 E
19 Great America Pkwy and US 101 NB Off Ramp AM 11.4 B 9.6 A -1.2 0.131 (CMP) PM 9.6 A 8.9 A -0.5 0.069
20 Bowers Avenue and US 101 SB Off Ramp AM 11.9 B 15.0 B 2.9 0.125 (CMP) PM 10.9 B 13.0 B 2.1 0.050
21 Bowers Avenue and Augustine Drive AM 26.0 C 26.1 C 2.7 0.043 PM 36.4 D 36.3 D 0.0 -0.006
22 Bowers Avenue and Scott Boulevard AM 49.6 D 52.6 D 3.9 0.064 (CMP) PM 37.1 D 37.9 D 1.3 0.031
23 Bowers Avenue and Central Expressway AM 89.0 F 91.1 F 6.5 0.040 (CMP) PM 103.6 F 109.8 F 9.5 0.019
24 Bowers Avenue and Kifer Road/Walsh Avenue AM 36.0 D 36.0 D 0.0 0.019 PM 30.4 C 30.7 C -0.6 0.021
25 Mission College Loop and Mission College Blvd AM 12.1 B 14.2 B 2.8 0.021 PM 25.2 C 23.9 C -1.3 0.050
Background (2030) Conditions
with Project
Freedom Circle Buildout - With
Improvement & 10% TDM No Project Freedom Circle Buildout Freedom Circle Focus Area Plan and Greystar General Plan Amendment TA December 22, 2021 Page | 62
Table 10 (Continued)
Background Intersection Levels of Service – Focus Area Buildout
Incr. In Incr. In
Peak Avg Avg Crit. Crit. Avg
# Intersection Hour Delay LOS Delay LOS Delay V/C Delay LOS 26 Marriott Dwy and Mission College Blvd AM 11.8 B 23.5 C 18.2 0.329 PM 12.0 B 51.1 D 61.9 0.440
27 Freedom Circle W and Mission College Blvd AM 11.0 B 70.1 E 86.9 0.680 46.6 D PM 25.9 C 217.3 F 283.3 0.893 33.8 C
28 Agnew/Freedom Circle E & Mission College Blvd AM 31.1 C 42.2 D 17.4 0.297 31.3 C PM 31.5 C 126.1 F 128.4 0.531 37.5 C
29 Great America employee entrance and Agnew Rd AM 3.6 A 4.2 A 1.0 0.107 PM 5.1 A 11.1 B 8.2 0.205
30 Juliette Lane and Mission College Boulevard AM 13.5 B 11.7 B -19.9 0.260 PM 22.6 C 20.4 C -1.3 0.154
31 Burton Drive and Mission College Boulevard AM 20.5 C 31.8 C 16.2 0.265 PM 18.8 B 18.6 B 1.2 0.132
32 Mission College Blvd and Montague Expwy AM 98.3 F 127.0 F 69.9 0.262 (CMP) PM 72.7 E 69.8 E 22.6 0.139
33 San Tomas Expressway and Scott Boulevard AM 79.0 E 80.8 F 1.7 0.024 (CMP) PM 56.7 E 57.5 E 1.1 0.008
34 San Tomas Expressway and Monroe Street AM 43.2 D 47.4 D 1.2 0.007 (CMP) PM 45.8 D 47.8 D 1.7 0.084
35 San Tomas Expressway and El Camino Real AM 85.5 F 88.6 F 8.0 0.220 (CMP) PM 74.5 E 80.1 F 9.6 0.029
36 Convention Center and Tasman Drive AM 14.8 B 15.2 B 0.0 0.027 PM 15.5 B 16.4 B 0.8 0.025
37 Centennial Boulevard and Tasman Drive AM 25.5 C 26.5 C 0.4 0.023 PM 27.3 C 28.5 C 2.2 0.034
38 Calle Del Sol and Tasman Drive AM 21.8 C 22.6 C 0.3 0.026 PM 23.3 C 22.2 C -1.0 0.022
39 Lick Mill Boulevard and Tasman Drive AM 41.3 D 41.8 D 3.5 0.022 PM 41.2 D 40.4 D -1.5 -0.021
40 Lafayette Street and Calle De Luna AM 23.2 C 23.9 C 0.9 0.062 PM 36.9 D 33.9 C -4.2 -0.016
41 Lafayette Street and Agnew Road AM 29.3 C 37.4 D 12.7 0.132 PM 51.0 D 50.6 D -3.3 -0.005
42 Scott Boulevard and Central Expressway AM 67.6 E 74.7 E 10.7 0.162 (CMP) PM 109.5 F 115.2 F 5.8 0.016
43 Lafayette Street and Central Expressway AM 75.2 E 82.9 F 13.1 0.047 (CMP) PM 62.6 E 68.8 E 14.1 0.038
44 De la Cruz Boulevard and Central Expressway AM 107.2 F 118.2 F 14.4 0.018 102.2 F (CMP) PM 70.3 E 75.5 E 10.1 0.010 70.0 E
45 Agnew Rd/De La Cruz Blvd and Montague Expwy AM 94.4 F 93.4 F -0.7 0.057 (CMP) PM 106.0 F 103.5 F -4.0 0.002
46 Lick Mill Boulevard and Montague Expressway AM 56.1 E 54.0 D -7.1 0.017 PM 52.1 D 69.6 E 31.1 0.060
47 N. 1st Street and Montague Expressway AM 132.6 F 141.3 F 14.2 0.032 (CMP) PM 121.4 F 118.7 F -13.3 -0.018
Background (2030) Conditions
with Project
Freedom Circle Buildout - With
Improvement & 10% TDM No Project Freedom Circle Buildout Freedom Circle Focus Area Plan and Greystar General Plan Amendment TA December 22, 2021 Page | 63
Table 10 (Continued)
Background Intersection Levels of Service – Focus Area Buildout
In addition to physical improvements recommended to resolve deficiencies at affected intersections, the Freedom Circle Focus Area will include Travel Demand Management (TDM) measures to achieve a 10 percent reduction in VMT per the City’s Climate Action Plan. A sensitivity analysis was conducted to determine if a reduction in project vehicle trips due to TDM would avoid any of the adverse effects at study intersections.
2. Lawrence Expressway and Sandia Avenue/Lakehaven Drive This City of Sunnyvale intersection would operate at an acceptable LOS E under background no project conditions during the PM peak hour. The buildout of the Freedom Circle Focus Area would cause the intersection to degrade to an unacceptable LOS F during the PM peak hour. This constitutes an adverse effect on intersection operations.
Intersection operations could be improved by widening Lawrence Expressway to add a fifth through lane on the northbound and southbound approaches. However, this improvement is not feasible because it would require acquisition of additional right of way and negatively impact adjacent properties. Implementation of TDM measures within the Freedom Circle Focus Area could reduce the vehicle trips associated with the development. However, a sensitivity analysis shows that a 10 percent Incr. In Incr. In
Peak Avg Avg Crit. Crit. Avg
# Intersection Hour Delay LOS Delay LOS Delay V/C Delay LOS 48 Zanker Road and Montague Expressway AM 57.5 E 62.2 E 9.1 0.025 57.1 E (CMP) PM 79.2 E 77.0 E -4.2 -0.028 57.1 E
49 Trimble Road and Montague Expressway AM 36.5 D 36.6 D 0.8 0.014 (CMP) PM 105.7 F 108.7 F 11.6 -0.012
50 McCarthy Blvd/O'Toole Av and Montague Expwy AM 75.9 E 82.7 F 8.4 0.025 (CMP) PM 134.0 F 141.5 F 10.0 0.007
51 Lawrence Expressway and Kifer Road AM 102.3 F 101.1 F 2.1 -0.004 PM 181.3 F 175.3 F -10.3 -0.019
52 Lawrence Expressway and Reed Ave/Monroe St AM 124.3 F 128.4 F 3.7 0.006 (CMP) PM 71.1 E 73.6 E 5.9 0.019
53 Lawrence Expressway and Homestead Road AM 51.7 D 52.0 D 1.1 0.013 (CMP) PM 69.4 E 70.2 E 1.0 0.010
54 Lawrence Expressway and Pruneridge Avenue AM 79.6 E 83.7 F 7.5 0.023 PM 62.6 E 64.1 E 0.5 0.019
55 Bowers Avenue and Monroe Street AM 33.4 C 33.9 C 0.6 0.016 PM 40.7 D 41.5 D 0.8 0.011
56 Bowers Ave/Kiely Boulevard and El Camino Real AM 28.9 C 29.3 C 0.5 0.024 (CMP) PM 31.8 C 32.1 C 0.3 0.009
57 Kiely Boulevard and Benton Street AM 37.2 D 37.7 D 1.0 0.018 PM 46.1 D 47.7 D 2.3 0.016
58 Kiely Boulevard and Homestead Road AM 38.6 D 38.9 D 1.3 0.030 PM 57.9 E 59.7 E 1.4 0.009
Notes:
Bold indicates a substandard level of service.
Bold indicates an adverse effect caused by the project.
OVFL indicates that the result is out of software calculation limits.
Background (2030) Conditions
with Project
Freedom Circle Buildout - With
Improvement & 10% TDM No Project Freedom Circle Buildout Freedom Circle Focus Area Plan and Greystar General Plan Amendment TA December 22, 2021 Page | 64
TDM trip reduction within the Focus Area would not be sufficient to avoid the adverse effect on intersection operations.
The Long-Range Transportation Plan for Santa Clara County (VTP2040) lists a project (VTP ID# R39) that would realign Wildwood Avenue to connect directly with Lawrence Expressway and create a new signalized intersection at Lawrence Expressway and Wildwood Avenue. This improvement would have a beneficial effect on traffic operations at the Lawrence/Sandia/Lakehaven intersection. The Freedom Circle Focus Area developments should provide fair-share funding towards this improvement.
4. Lawrence Expressway and US 101 Southbound Ramps
This CMP intersection in the City of Sunnyvale would operate at an unacceptable LOS F under background no project conditions during the PM peak hour. The buildout of the Freedom Circle Focus Area would cause the intersection’s average critical movement delay to decrease, but the critical v/c would increase by more than 0.01 during the PM peak hour. This constitutes an adverse effect on intersection operations.
Implementation of TDM measures within the Focus Area could reduce the vehicle trips associated with the development. However, a sensitivity analysis shows that a 10 percent TDM trip reduction within the Focus Area would not be sufficient to avoid the adverse effect on intersection operations. Intersection operations could be improved to an acceptable level by converting an eastbound left-turn lane to a shared left-turn/right-turn lane. The cost of this improvement will be fully funded by Freedom Circle Focus Area developments.
5. Lawrence Expressway and E. Arques Avenue
This CMP intersection in the City of Sunnyvale would operate at an unacceptable LOS F under background no project conditions during the PM peak hour. The buildout of the Freedom Circle Focus Area would cause the intersection’s average critical movement delay to increase by 15.5 seconds and the critical v/c to increase by 0.049 during the PM peak hour. This constitutes an adverse effect on intersection operations.
Implementation of TDM measures within the Freedom Circle Focus Area could reduce the vehicle trips associated with the development. However, a sensitivity analysis shows that a 10 percent TDM trip reduction within the Focus Area would not be sufficient to avoid the adverse effect on intersection operations. The County identified the need for a grade-separated interchange at this location as part of the 2040 Expressway Plan. The Freedom Circle Focus Area developments should provide fair-share funding towards this improvement. The funds collected for this improvement are subject to programming by the County for Board-approved projects.
17. Great America Parkway and Patrick Henry Drive
This City of Santa Clara intersection would operate at an unacceptable LOS E during the PM peak hour under background conditions. The buildout of the Freedom Circle Focus Area would cause the average critical movement delay to increase by 15.6 seconds and the critical v/c to increase by 0.035 during the PM peak hour. This constitutes an adverse effect on intersection operations.
Intersection operations could be improved by constructing a second northbound left-turn lane and a second eastbound right-turn lane. Although intersection widening for dual right-turn lanes may improve vehicle operations, this improvement conflicts with bicycle and pedestrian policies within the City’s 2010-2035 General Plan (GP), 2018 Bicycle Master Plan (BMP), and 2019 Pedestrian Master Plan (PMP). Intersection widening is discouraged by GP Policy 5.8.2-P2 and PMP Policies 1.A.3, 2.A.1, and
2.A.4. Dual right-turn lanes result in challenges with visibility between turning vehicles and pedestrians (Caltrans Highway Design Manual 403.6(1)) and this conflicts with GP Policy 5.8.4-P13, BMP Policy Freedom Circle Focus Area Plan and Greystar General Plan Amendment TA December 22, 2021 Page | 65
1.A.2 and PMP Policies 1.A.3 and 2.A.5. Furthermore, intersection widening reduces the width of sidewalks and conflicts with GP Policy 5.8.2-P1 and the PMP Pedestrian Recommendation Toolbox.
Therefore, intersection widening for dual right-turn lanes is not recommended. With the recommended dual northbound left-turn lanes and a 10 percent TDM reduction, the intersection is expected to continue to operate at an unacceptable LOS E during the PM peak hour under background plus project conditions. The cost of this improvement will be fully funded by Freedom Circle Focus Area developments.
Developments within the Freedom Circle Focus Area also will be responsible for construction of a Class IV separated bikeway on Great America Parkway. This multimodal improvement, which is identified in the City’s Bicycle Master Plan Update 2018, would encourage residents and employees to leave their vehicles at home by adding a physical barrier between the existing bike lane and the vehicular travel lane, thereby increasing the comfort level for cyclists. Adjacent to the Focus Area, the bikeway improvement will be constructed as part of the Focus Area Plan. Beyond the Focus Area (between Patrick Henry Drive and SR 237), Freedom Circle area stakeholders will pay a fair share fee for future construction of the bikeway on Great America Parkway.
18. Great America Parkway and Mission College Boulevard This CMP intersection in the City of Santa Clara would operate at an acceptable LOS D during the PM peak hour under background conditions. The buildout of the Freedom Circle Focus Area would cause the intersection to degrade to an unacceptable LOS F during the PM peak hour. This constitutes an adverse effect on intersection operations.
Intersection operations could be improved to an acceptable LOS E by converting Hichborn Drive from one-way (eastbound only) flow to two-way flow with a 60-foot right-of-way width, adding a traffic signal at Great America Parkway and Hichborn Drive to allow left and right turns in and out, and synchronizing the new signal with the traffic signal at Great America Parkway and Mission College Boulevard. In addition, the US 101 northbound off-ramp right turn to northbound Great America Parkway would be modified to reduce the curb radius to 50 feet. With the recommended improvements and a 10 percent TDM reduction, the intersection is expected to operate at an acceptable LOS E during the PM peak hour under background plus project conditions. The cost of this improvement will be fully funded by Freedom Circle Focus Area developments.
23. Bowers Avenue and Central Expressway
This CMP intersection in the City of Santa Clara would operate at an unacceptable LOS F under background no project conditions during the AM and PM peak hours. The buildout of the Freedom Circle Focus Area would cause the intersection’s average critical movement delay to increase by more than 4.0 seconds and the critical v/c to increase by more than 0.01 during the AM and PM peak hours.
This constitutes an adverse effect on intersection operations.
Implementation of TDM measures within the Focus Area could reduce the vehicle trips associated with the Freedom Circle development. However, a sensitivity analysis shows that a 10 percent TDM trip reduction within the Focus Area would not be sufficient to avoid the adverse effect on intersection operations. The County identified the need for a grade-separated interchange at this location as part of the 2040 Expressway Plan. The Freedom Circle Focus Area developments should provide fair-share funding towards this improvement. The funds collected for this improvement are subject to programming by the County for Board-approved projects.
27. Freedom Circle (W) and Mission College Boulevard
This City of Santa Clara intersection would operate at an acceptable LOS B and LOS C under background no project conditions during the AM and PM peak hours, respectively. The buildout of the Freedom Circle Focus Area Plan and Greystar General Plan Amendment TA December 22, 2021 Page | 66
Freedom Circle Focus Area would cause the intersection to degrade to an unacceptable LOS E during the AM peak hour and to LOS F during the PM peak hour. This constitutes an adverse effect on intersection operations.
Intersection operations could be improved by adding an eastbound right-turn lane, removing the crosswalk on the west leg, relocating bus stops to the east side of the intersection, restriping the northbound approach for one right-turn lane, one shared through/left-turn lane and one left-turn lane, and implementing split-phase signal control for the north and south legs. The construction of these improvements along with the planned Class IV separated bike lanes on Mission College Boulevard would require widening Mission College Boulevard and require the dedication of additional right of way on the east side of the intersection. The dedication is required to install a far side bus stop and near side bus stop in accordance with VTA Bus Stop and Passenger Facilities Standards. Intersection operations could be further improved by the proposed improvements at Great America Parkway and Hichborn Drive: converting Hichborn Drive from one-way (eastbound only) flow to two-way flow and adding a traffic signal at Great America Parkway and Hichborn Drive to allow left and right turns in and out... This roadway network change would provide another route out of the Freedom Circle Focus Area and thus reduce the northbound left-turn volume at the Freedom Circle W/Mission College Boulevard intersection. With the recommended improvement on the eastbound and northbound approaches, the improvements at Great America Parkway and Hichborn Drive, and a 10 percent TDM reduction, the intersection is expected to operate an acceptable LOS D or C during the AM and PM peak hours, respectively. Therefore, these improvements would be sufficient to fully offset the adverse effect on intersection operations. The cost of these improvements will be fully funded by Freedom Circle Focus Area developments.
28. Agnew Road/Freedom Circle (E) and Mission College Boulevard This City of Santa Clara intersection would operate at an acceptable LOS C during the PM peak hour under background no project conditions. The buildout of the Freedom Circle Focus Area would cause the intersection to degrade to an unacceptable LOS F during the PM peak hour. This constitutes an adverse effect on intersection operations.
Intersection operations could be improved by adding a northbound right-turn lane. The intersection is expected to operate at an acceptable LOS D during the PM peak hour with the recommended improvement and a 10 percent TDM reduction. Thus, the recommended improvement would be sufficient to fully offset the adverse effect on intersection operations. The cost of this improvement will be fully funded by Freedom Circle Focus Area developments.
32. Mission College Boulevard/Thomas Road and Montague Expressway This CMP intersection in the City of Santa Clara would operate at an unacceptable LOS F during the AM peak hour under background conditions. The buildout of the Freedom Circle Focus Area would cause the average critical movement delay to increase by more than four seconds and the critical v/c to increase by more than 0.01 during the AM peak hour. This constitutes an adverse effect on intersection operations.
Implementation of TDM measures within the Focus Area could reduce the vehicle trips associated with the Freedom Circle development. However, a sensitivity analysis shows that a 10 percent TDM trip reduction within the Focus Area would not be sufficient to avoid the adverse effect on intersection operations. Intersection operations could be improved by constructing a partial grade separation with a flyover from eastbound Montague Expressway to northbound Mission College Boulevard. This improvement was identified as part of the 2040 Expressway Plan. The Freedom Circle Focus Area developments should provide fair-share funding towards this improvement. The funds collected for this improvement are subject to programming by the County for Board-approved projects.
Freedom Circle Focus Area Plan and Greystar General Plan Amendment TA December 22, 2021 Page | 67
35. San Tomas Expressway and El Camino Real
This CMP intersection in the City of Santa Clara would operate at an unacceptable LOS F during the AM peak hour and an acceptable LOS E during the PM peak hour under background no project conditions. The buildout of the Freedom Circle Focus Area would cause the intersection’s average critical movement delay to increase by 8.0 seconds and the critical v/c to increase by 0.220 during the AM peak hour and would cause the intersection to degrade to an unacceptable LOS F during the PM peak hour. This constitutes an adverse effect on intersection operations.
Implementation of TDM measures could reduce the vehicles trips associated with the Freedom Circle Focus Area developments. However, a sensitivity analysis shows that a 10 percent TDM trip reduction within the Focus Area would not be sufficient to avoid the adverse effect on intersection operations. The County identified the need for a grade-separated interchange at this location as part of the 2040 Expressway Plan. The Freedom Circle Focus Area developments should provide fair-share funding towards this improvement. The funds collected for this improvement are subject to programming by the County for Board-approved projects.
42. Scott Boulevard and Central Expressway
This CMP intersection in the City of Santa Clara would operate at an unacceptable LOS F under background no project conditions during the PM peak hour. The buildout of the Freedom Circle Focus Area would cause the intersection’s average critical movement delay to increase by more than 4.0 seconds and the critical v/c to increase by more than 0.01 during the PM peak hour. This constitutes an adverse effect on intersection operations.
Implementation of TDM measures within the Freedom Circle Focus Area could reduce the vehicles trips associated with the Focus Area development. However, a sensitivity analysis shows that a 10 percent TDM trip reduction within the Focus Area would not be sufficient to avoid the adverse effect on intersection operations. The County identified the need for a grade-separated interchange at this location as part of the 2040 Expressway Plan. The Freedom Circle Focus Area developments should provide fair-share funding towards this improvement. The funds collected for this improvement are subject to programming by the County for Board-approved projects.
43. Lafayette Street and Central Expressway
This CMP intersection in the City of Santa Clara would operate at an acceptable LOS E under background no project conditions during the AM peak hour. The buildout of the Freedom Circle Focus Area would cause the intersection to degrade to an unacceptable LOS F during the AM peak hour. This constitutes an adverse effect on intersection operations.
Implementation of TDM measures within the Freedom Circle Focus Area could reduce the vehicles trips associated with the Focus Area development. However, a sensitivity analysis shows that a 10 percent TDM trip reduction within the Focus Area would not be sufficient to avoid the adverse effect on intersection operations. The County identified the need for a grade-separated interchange at this location as part of the 2040 Expressway Plan. The Freedom Circle Focus Area developments should provide fair-share funding towards this improvement. The funds collected for this improvement are subject to programming by the County for Board-approved projects.
44. De La Cruz Boulevard and Central Expressway
This CMP intersection in the City of Santa Clara would operate at an unacceptable LOS F under background no project conditions during the AM peak hour. The buildout of the Freedom Circle Focus Area would cause the intersection’s average critical movement delay to increase by more than 4.0 Freedom Circle Focus Area Plan and Greystar General Plan Amendment TA December 22, 2021 Page | 68
seconds and the critical v/c to increase by more than 0.01 during the AM peak hour. This constitutes an adverse effect on intersection operations.
Implementation of TDM measures within the Freedom Circle Focus Area could reduce the vehicle trips associated with the Focus Area development. However, a sensitivity analysis shows that a 10 percent TDM trip reduction within the Focus Area would not be sufficient to avoid the adverse effect on intersection operations.
The analysis of background conditions at this intersection assumes the following planned improvements: a third southbound through lane and a second southbound right-turn lane; a second eastbound right-turn lane; a third northbound left-turn lane and removal of one northbound through lane. The planned conversion of the existing HOV lanes on Central Expressway to mixed-flow lanes is anticipated to be complete sometime between the Year 2030 and 2040. Thus, this improvement is assumed under cumulative conditions but not background conditions. While the intersection would continue to operate at LOS F under background plus project conditions during the AM peak hour with this planned improvement and a 10 percent TDM reduction, the delay would be less than under no project conditions. The Freedom Circle Focus Area developments should provide fair-share funding towards this improvement.
45. Agnew Road/De La Cruz Boulevard and Montague Expressway This CMP intersection in the City of Santa Clara would operate at an unacceptable LOS F under background no project conditions during the AM peak hour. The buildout of the Freedom Circle Focus Area would cause the intersection’s average critical movement delay to decrease but the critical v/c to increase by more than 0.01 during the AM peak hour. This constitutes an adverse effect on intersection operations.
Implementation of TDM measures within the Freedom Circle Focus Area could reduce the vehicle trips associated with the Focus Area development. However, a sensitivity analysis shows that a 10 percent TDM trip reduction within the Focus Area would not be sufficient to avoid the adverse effect on intersection operations. This intersection is included in the City of Santa Clara Multimodal Improvement Plan (MIP). MIP Actions intended to address the LOS deficiency at this intersection include installation of crosswalk motion sensors, accessible pedestrian signals, upgraded safety lighting, travel time data collection systems, traffic monitoring cameras, and periodic retiming of signal coordination at intersections along Agnew Road/De La Cruz Boulevard. The Freedom Circle Focus Area developments should provide fair-share funding towards these multimodal improvements.
47. N. 1st Street and Montague Expressway
This CMP intersection in the City of San José would operate at an unacceptable LOS F under background conditions during the AM peak hour. The buildout of the Freedom Circle Focus Area would cause the intersection’s average critical movement delay to increase by 14.2 seconds and the critical v/c to increase by 0.032 during the AM peak hour. This constitutes an adverse effect on intersection operations.
Implementation of TDM measures within the Freedom Circle Focus Area could reduce the vehicle trips associated with the Focus Area development and lessen the adverse effect. However, a sensitivity analysis shows that a 10 percent TDM trip reduction within the Focus Area would not be sufficient to avoid the adverse effect on intersection operations. The County identified the need for a gradeseparated interchange at this location as part of the 2040 Expressway Plan. The Freedom Circle Focus Area developments should provide fair-share funding towards this improvement. The funds collected for this improvement are subject to programming by the County for Board-approved projects.
Freedom Circle Focus Area Plan and Greystar General Plan Amendment TA December 22, 2021 Page | 69
48. Zanker Road and Montague Expressway
This CMP intersection in the City of San José would operate at an unacceptable LOS E under background conditions during the AM peak hour. The buildout of the Freedom Circle Focus Area would cause the intersection’s average critical movement delay to increase by 9.1 seconds and the critical v/c to increase by 0.025 during the AM peak hour. This constitutes an adverse effect on intersection operations.
The City of San José plans to widen Zanker Road to three lanes in each direction from River Oaks Parkway to Trimble Road and to add a second left-turn lane on both the northbound and southbound approaches. This improvement is anticipated to be complete sometime between the Year 2030 and 2040. Thus, this improvement is assumed under cumulative conditions but not background conditions.
While the intersection would continue to operate at an unacceptable LOS E with this planned improvement and a 10 percent TDM reduction, the delay would be less than under no project conditions. The Freedom Circle Focus Area developments should either pay the North San José fee, or a fair-share contribution for the improvement, or a fair-share contribution for off-setting multimodal improvements based on the Focus Area’s percent contribution to the traffic volume growth at the intersection.
50. McCarthy Boulevard/O’Toole Avenue and Montague Expressway This CMP intersection in the City of San José would operate at an unacceptable LOS E under background conditions during the AM peak hour. The buildout of the Freedom Circle Focus Area would cause the intersection to degrade to LOS F and cause the intersection’s average critical movement delay to increase by 8.4 seconds and the critical v/c to increase by 0.025 during the AM peak hour. This constitutes an adverse effect on intersection operations.
Implementation of TDM measures within the Freedom Circle Focus Area could reduce the vehicles trips associated with the Focus Area development. However, a sensitivity analysis shows that a 10 percent TDM trip reduction within the Focus Area would not be sufficient to avoid the adverse effect on intersection operations. The City of San José plans to construct a “square-loop” interchange to replace the at-grade intersection. This improvement is anticipated to be complete sometime between the Year 2030 and 2040. Thus, this improvement is assumed under cumulative conditions but not background conditions. The Freedom Circle Focus Area developments should either pay the North San José fee, or a fair-share contribution for this improvement.
54. Lawrence Expressway and Pruneridge Avenue
This City of Santa Clara intersection would operate at an acceptable LOS E under background conditions during the AM and PM peak hours. The buildout of the Freedom Circle Focus Area would cause the intersection to degrade to unacceptable LOS F during the AM peak hour. This constitutes an adverse effect on intersection operations.
Implementation of TDM measures could reduce the vehicle trips associated with the Freedom Circle Focus Area. However, a sensitivity analysis shows that a 10 percent TDM trip reduction within Focus Area would not be sufficient to avoid the adverse effect on intersection operations. The County identified the need for a grade-separated interchange at this location as part of the 2040 Expressway Plan. The Freedom Circle Focus Area developments should provide fair-share funding towards this improvement. The funds collected for this improvement are subject to programming by the County for Board approved improvement projects.
Freedom Circle Focus Area Plan and Greystar General Plan Amendment TA December 22, 2021 Page | 70
Summary of Background Plus Project Conditions – Focus Area Buildout Table 11 presents a summary of the intersections that would be adversely affected under background plus project conditions with buildout of the Freedom Circle Focus Area and the improvements recommended. The table also shows the development level triggering the need for each improvement both as a percentage of the Freedom Circle Focus Area buildout and as the total daily vehicle trips generated by all parcels within the Focus Area. With the exception of planned improvements to intersections on County Expressways and planned multimodal improvements, to which the project would pay a fair-share contribution, the project will fully fund the improvements required to offset adverse effects identified under background plus project conditions.
Freedom Circle Focus Area Plan and Greystar General Plan Amendment TA December 22, 2021 Page | 71
Table 11 Summary of Affected Intersections under Background Plus Project Conditions – Focus Area Buildout Project
# Intersection Jurisdiction Recommended Improvements Responsibility2 Lawrence Expwy and Sandia Av/Lakehaven Dr SCC 13.6% % of Total Traffic 9,543
4 Lawrence Expressway and US 101 SB Ramps SCC 14.3% 100% 10,011
5 Lawrence Expressway and E. Arques Ave. SCC 25.8% % of Total Traffic (CMP) 18,084
17 Great America Parkway and Patrick Henry Drive SC 28.6% Add a second northbound left-turn lane 100% 20,021 Construct Class IV bikeway on Great America Parkway adjacent Plan Construct Class IV bikeway on Great America Parkway between SR 237 and Patrick Henry Drive (Bicycle Master Plan Update 2018) 100%
% of Total Traffic
18 Great America Pkwy and Mission College Blvd SC 24.1% 100% (CMP) 16,910
23 Bowers Avenue and Central Expressway SCC 52.6% % of Total Traffic (CMP) 36,882
27 Freedom Circle W and Mission College Blvd SC 15.2% 100% 10,654
28 Agnew/Freedom Circle E & Mission College Blvd SC 24.8% 100% 17,408
32 Mission College Blvd and Montague Expwy SCC 5.7% Construct partial grade separation % of Total Traffic (CMP) 4,010 (2040 Expressway Plan)
35 San Tomas Expressway and El Camino Real SCC 50.0% % of Total Traffic (CMP) 35,038
42 Scott Boulevard and Central Expressway SCC 69.0% Construct grade separated interchange % of Total Traffic (CMP) 48,328 (2040 Expressway Plan)
Add an eastbound right-turn lane; Remove west leg crosswalk; Relocate bus stops to the east side of the intersection; Restripe south leg with 1 left-turn, 1 left-turn/through, 1 right-turn lane; Make north leg and south leg split phase; Convert Hichborn Dr. to 2-way flow and add a signal at Great America Parkway.Construct grade separated interchange (2040 Expressway Plan)Realign Wildwood Avenue to connect with Lawrence Expressway and create a new signalized intersection (VTP 2040)Construct grade separated interchange (Measure B Expressway Program)Construct grade separated interchange (2040 Expressway Plan) Development Level
Triggering Need for
Improvement % (daily trips)
Convert eastbound left-turn lane to a shared left-turn/right-turn laneAdd a northbound right-turn laneConvert Hichborn Drive from one-way (eastbound only) flow to two-way flow with a 60-feet right-of-way width, add a traffic signal at Great America Parkway and Hichborn Drive to allow left and right turns in and out, synchronize the new signal with the traffic signal at Great America Parkway and Mission College Boulevard, reduce the curb radius at the US 101 northbound off-ramp right turn to northbound Great America Parkway to 50 feet.
Freedom Circle Focus Area Plan and Greystar General Plan Amendment TA December 22, 2021 Page | 72
Table 11 (continued) Summary of Affected Intersections under Background Plus Project Conditions – Focus Area Buildout Project
# Intersection Jurisdiction Recommended Improvements Responsibility1 43 Lafayette Street and Central Expressway SCC 62.3% Construct grade separated interchange % of Total Traffic (CMP) 43,683 (2040 Expressway Plan)
44 De la Cruz Boulevard and Central Expressway SCC 55.6% % of Total Traffic (CMP) 38,931
45 Agnew Rd/De La Cruz Blvd and Montague Expwy SCC 17.5% Implement measures identified in Multimodal Improvement Plan % of Total Traffic (CMP) 12,294
47 N. 1st Street and Montague Expressway SCC 31.3% Construct grade separated interchange % of Total Traffic (CMP) 21,898 (2040 Expressway Plan)
48 Zanker Road and Montague Expressway SCC 44.0%
(CMP) 30,802
50 McCarthy Blvd/O'Toole Av and Montague Expwy SCC 47.6% (CMP) 33,369
54 Lawrence Expressway and Pruneridge Avenue SCC 53.3% Construct grade separated interchange % of Total Traffic 37,373 (2040 Expressway Plan)
Notes:
SCC = Santa Clara County, SC = Santa Clara, SJ = San Jose, SV = Sunnyvale Widen Zanker Rd to 3 lanes in each direction from River Oaks Parkway to Trimble Rd and add a 2nd left-turn lane on both the NB and SB approaches (North San José Deficiency Plan) Pay North San José fee or
fair-share contribution
Convert the existing HOV lanes on Central Expressway to mixed-flow lanes (VTP 2040)Construct grade separated "square loop" interchange (North San José Area Development Policy, Phase 3, 2017) Pay North San José fee or
fair-share contribution
Development Level
Triggering Need for
Improvement
% (daily trips)
Freedom Circle Focus Area Plan and Greystar General Plan Amendment TA December 22, 2021 Page | 73
5. Cumulative Conditions
This chapter describes the roadway traffic operations under cumulative no project conditions, cumulative plus project conditions without Greystar, and cumulative plus project conditions including Greystar. Cumulative conditions represent the Year 2040. Cumulative no project conditions include all anticipated developments in the area including the buildout of the Patrick Henry Drive Specific Plan (PHDSP) Option 2 except development of the Freedom Circle Focus Area. Cumulative plus project conditions including Greystar were evaluated relative to cumulative plus project conditions without Greystar to identify adverse effects of the Greystar General Plan Amendment. Cumulative plus project conditions including Greystar also were evaluated relative to cumulative no project conditions to identify adverse effects of the Freedom Circle Focus Area Plan. This chapter describes cumulative improvements assumed in the Year 2040 transportation network, the procedure used to forecast cumulative traffic volumes, the resulting traffic conditions, and improvements recommended to alleviate adverse effects of the Greystar General Plan Amendment and the Freedom Circle Focus Area Plan.
Roadway Network under Cumulative Conditions
The transportation network under cumulative conditions is assumed to include all of the background transportation improvements described in Chapter 3 plus the following additional improvements at study intersections. The intersection improvements are planned CIP projects and improvements that will be funded by City Place as mitigation for buildout of the project. Figure 12 shows the lane configurations at the study intersections under cumulative conditions.
38. Calle Del Sol and Tasman Drive: reconfigure southbound approach to include two left-turn lanes and one right-turn lane with overlap phase.
40. Lafayette Street and Calle De Luna: reconstruct the westbound approach to include two left-turn lanes and one right-turn lane.
41. Lafayette Street and Agnew Road: add a second eastbound left-turn lane and a second southbound left-turn lane.
42. Scott Boulevard and Central Expressway: convert Central Expressway HOV lane to mixed-flow lane, resulting in 3 mixed-flow lanes in each direction (eastbound and westbound).
43. Lafayette Street and Central Expressway: convert Central Expressway HOV lane to mixed-flow lane, resulting in 3 mixed-flow lanes in each direction (eastbound and westbound).
44. De la Cruz Boulevard and Central Expressway: convert Central Expressway HOV lane to mixed-flow lane, resulting in 3 mixed-flow lanes in eastbound direction.
Freedom Circle Focus Area Plan and Greystar General Plan Amendment TA December 22, 2021 Page | 77
46. Lick Mill Boulevard and Montague Expressway: add a third southbound left-turn lane.
48. Zanker Road and Montague Expressway: widen Zanker Road to three lanes in northbound and southbound directions from River Oaks Parkway to Trimble Road; Add a second northbound left-turn lane and a second southbound left-turn lane.
50. McCarthy Boulevard/O’Toole Avenue and Montague Expressway: construction of a “square-loop” interchange to replace the at-grade intersection.
55. Bowers Avenue and Monroe Street: add a northbound left-turn lane and a southbound left-turn lane and change northbound and southbound approaches from split to protected leftturn phasing.
Cumulative plus project conditions assume the above transportation improvements and the same intersection lane configuration as shown in Figure 12.
Cumulative Traffic Volumes
Cumulative No Project Traffic Volumes
Traffic volumes under cumulative no project conditions (see Figure 13) were estimated using the CSC travel demand forecast model. The model land use assumptions reflect ABAG 2040 land use projections in most locations. In the vicinity of the Focus Area, the model assumes buildout of City Place and the Tasman East Specific Plan Area as well as development of an additional 1,500 dwelling units per a proposed Amendment to the Tasman East Specific Plan.
Cumulative no project conditions also assume buildout of the proposed Kylli site located immediately north of the PHDSP Area and the buildout of the PHDSP Option 2. As originally proposed, the Kylli mixed-use development totaled 10.61 million gross square feet. The application is currently on hold as Kylli works to prepare a reduced-density plan with reduced heights based on feedback from the FAA.
While the reduced density plan has not yet been finalized, for the purpose of this analysis, the Kylli site is assumed to contain 3,170 residential dwelling units, 3,060,000 s.f. of office space, approximately 250,000 s.f. of retail/restaurant space, a 300-room hotel, a 600-student elementary school and a 160- student day care.
The PHDSP Option 2 land uses under this cumulative scenario are assumed to include approximately 10,300 residential units and 1,095,000 s.f. of non-residential uses, including 785,000 s.f. of office space, 150,000 s.f. of retail space, a 45,000 s.f. library, 25,000 s.f. of community/civic uses, and 90,000 s.f. of flex space, which is assumed to be an equal mix of office space, retail space, and residential amenities.
Like under background no project conditions, cumulative no project conditions assume a modest level of job growth (approximately 13 percent) above the existing employment within the Freedom Circle Focus Area. In addition, cumulative no project conditions assume the construction of the approved Sobrato development at 4301 Great America Parkway, which would add 718,000 s.f. of office space to the existing uses.
While the ABAG land use data do not reflect any growth in enrollment at Mission College from 2018 to 2040, the forecasts were modified to reflect a ten percent increase in enrollment by the Year 2040 based on historic data obtained from the California Community Colleges Chancellor’s Office.
Generally, traffic volumes under Cumulative (Year 2040) conditions are greater than that under Background (Year 2030) conditions. However, trips generated by the proposed Kylli mixed-use development and the Patrick Henry Drive Specific Plan Area, which are assumed to be completed in
Freedom Circle Focus Area Plan and Greystar General Plan Amendment TA December 22, 2021 Page | 81
the Year 2040 but not 2030, would displace other traffic resulting in a decrease in traffic volume for certain movements. For example, the eastbound through movement at the Tasman/Old Ironsides intersection would be approximately 350 vehicles lower under Cumulative Conditions than under Background Conditions during the PM peak hour due to the large increase in traffic (830 vehicles) that would be added to the northbound right-turn movement from the Kylli and PHDSP developments.
Cumulative Plus Project Traffic Volumes Without Greystar This scenario reflects full buildout of the Freedom Circle Focus Area with the exception of the Greystar site, which would remain vacant. Traffic volumes under cumulative plus project conditions without Greystar were estimated using the CSC travel demand forecast model. The land use assumptions outside the Focus Area are unchanged from the above cumulative no project scenario. Except for the Greystar site, the land uses assumptions within the Freedom Circle Focus Area are the same as under background plus project conditions (see Chapter 4). Like under background plus project conditions, the trips generated by the Focus Area development were estimated based on ITE trip rates and reductions for internal trips and transit usage based on CSC model estimates.
The development of Freedom Circle Focus Area without Greystar is estimated to generate 72,164 gross daily trips including 7,481 AM peak hour trips and 7,724 PM peak hour trips. After applying the trip reductions, the Focus Area development without Greystar is expected to generate 65,168 net daily vehicle trips, 6,723 (5,245 inbound and 1,478 outbound) net AM peak hour trips, and 7,021 (1,662 inbound and 5,359 outbound) net PM peak hour trips under cumulative conditions (see Table 12). See Figure 14 for traffic volumes under cumulative plus project conditions without Greystar.
Table 12
Project Trip Generation Estimates – Focus Area Without Greystar Cumulative Plus Project Traffic Volumes Including Greystar This scenario reflects full buildout of the Freedom Circle Focus Area including the Greystar site. Traffic volumes under cumulative plus project including Greystar conditions were estimated using the CSC travel demand forecast model. The land use assumptions outside the Focus Area are unchanged from the above cumulative no project scenario. The land uses assumptions within the Freedom Circle Focus Area are the same as under background plus project conditions (see Chapter 4). Like under background plus project conditions, the trips generated by the Focus Area development were estimated based on ITE trip rates, a 25-percent pass-by trip reduction for retail uses, and reductions for internal trips and transit usage based on CSC model estimates.
Land Use Rate Trips
Mode
Share Rate In Out Total
Mode
Share Rate In Out Total
Mode
Share
Multifamily Housing (Mid-Rise) 2,500 Dwelling Units 5.44 13,600 0.36 234 666 900 0.44 671 429 1,100 Total Residential Trips 2,500 Dwelling Units 5.44 13,600 0.36 234 666 900 0.44 671 429 1,100 General Office Building 5,369,000 Square Feet 9.74 52,294 1.16 5,356 872 6,228 1.15 988 5,186 6,174 Hotel 750 Rooms 8.36 6,270 0.47 208 145 353 0.60 230 220 450 Total Employment Trips 5,369,000 Square Feet 58,564 5,564 1,017 6,581 1,218 5,406 6,624 Total Proposed Project Trips 72,164 100.0% 5,798 1,683 7,481 100.0% 1,889 5,835 7,724 100.0% Less Internal Trips (2,054) 2.8% (43) (43) (86) 1.1% (92) (92) (184) 2.4% Less External Public Transit Trips (4,942) 6.8% (510) (162) (672) 9.0% (135) (384) (519) 6.7% External Vehicle Trips 65,168 90.3% 5,245 1,478 6,723 89.9% 1,662 5,359 7,021 90.9% Source: Trip rates from ITE Trip Generation Manual, 10th Edition, 2017. Internal and transit trip reductions derived from CSC travel demand model.
AM Peak Hour PM Peak Hour
Daily Trips Trips
Size
Freedom Circle Focus Area Plan and Greystar General Plan Amendment TA December 22, 2021 Page | 82
The gross project trips generated by the development of Freedom Circle Focus Area including Greystar remain the same as described in Chapter 4. After applying the trip reductions, the Focus Area development including Greystar is expected to generate 70,250 net daily vehicle trips, 7,070 (5,342 inbound and 1,728 outbound) net AM peak hour trips, and 7,438 (1,917 inbound and 5,521 outbound) net PM peak hour trips under cumulative conditions (see Table 13). See Figure 15 for traffic volumes under cumulative plus project conditions including Greystar.
Table 13
Project Trip Generation Estimates – Focus Area Including Greystar Compared to Cumulative No Project Conditions, Cumulative traffic volumes with buildout of the Freedom Circle Focus Area including Greystar show substantial increases in traffic volumes in the peak commute directions due to the addition of a large number of jobs in an area that is already rich in jobs.
The buildout of the Freedom Circle Focus Area would also cause decreases in traffic volumes for some movements in the off-peak direction (eastbound Montague Expressway, for example) as the proposed new jobs would attract trips from residents in planned nearby residential developments such as the Patrick Henry Drive Specific Plan Area, the Kylli mixed-use site, the City Place development, and the Tasman East Specific Plan Area that would otherwise commute to other jobs farther away.
Land Use Rate Trips
Mode
Share Rate In Out Total
Mode
Share Rate In Out Total
Mode
Share
Multifamily Housing (Mid-Rise) 3,600 Dwelling Units 5.44 19,584 0.36 337 959 1,296 0.44 966 618 1,584 Total Residential Trips 3,600 Dwelling Units 5.44 19,584 0.36 337 959 1,296 0.44 966 618 1,584 General Office Building 5,369,000 Square Feet 9.74 52,294 1.16 5,356 872 6,228 1.15 988 5,186 6,174 Retail 2,000 Square Feet 37.75 76 0.94 1 1 2 3.81 4 4 8 Hotel 750 Rooms 8.36 6,270 0.47 208 145 353 0.60 230 220 450 Total Employment Trips 5,371,000 Square Feet 58,640 5,565 1,018 6,583 1,222 5,410 6,632 Total Proposed Project Trips 78,224 100.0% 5,902 1,977 7,879 100.0% 2,188 6,028 8,216 100.0% Less Internal Trips (2,430) 3.1% (54) (54) (108) 1.4% (107) (107) (214) 2.6% Less External Public Transit Trips (5,527) 7.1% (506) (195) (701) 8.9% (164) (398) (562) 6.8% Less Retail Passby Trips (17) 0.0% 00 0 0.0% (1) (1) (2) 0.0% External Vehicle Trips 70,250 89.8% 5,342 1,728 7,070 89.7% 1,917 5,521 7,438 90.5% Source: Trip rates from ITE Trip Generation Manual, 10th Edition, 2017. Internal and transit trip reductions derived from CSC travel demand model.
AM Peak Hour PM Peak Hour
Daily Trips Trips
Size
Freedom Circle Focus Area Plan and Greystar General Plan Amendment TA December 22, 2021 Page | 89
Cumulative No Project Intersection Levels of Service
This scenario was developed as the baseline to identify the adverse effects attributable to the full buildout of the Freedom Circle Focus Area including the Greystar site. The results of the intersection level of service analysis show that the following 31 study intersections would operate at an unacceptable level during at least one peak hour under cumulative no project conditions (see Table 14).
1. Lawrence Expressway and Tasman Drive (PM peak hour)
2. Lawrence Expressway and Sandia Avenue/Lakehaven Drive (AM and PM peak hours)
5. Lawrence Expressway and E. Arques Ave (PM peak hour)
6. Patrick Henry Drive and Tasman Drive (AM and PM peak hours)
8. Old Ironsides Drive and Old Glory Lane (AM and PM peak hours)
9. Old Ironsides Drive and Patrick Henry Drive (AM and PM peak hours)
12. Great America Parkway and Great America Way (PM peak hour)
16. Great America Parkway and Old Glory Lane (AM and PM peak hours)
17. Great America Parkway and Patrick Henry Drive (AM and PM peak hours)
18. Great America Parkway and Mission College Boulevard (AM and PM peak hours)
23. Bowers Avenue and Central Expressway (AM and PM peak hours)
32. Mission College Boulevard and Montague Expressway (AM and PM peak hours)
33. San Tomas Expressway and Scott Boulevard (AM peak hour)
35. San Tomas Expressway and El Camino Real (AM and PM peak hours)
39. Lick Mill Boulevard and Tasman Drive (AM and PM peak hours)
41. Lafayette Street and Agnew Road (PM peak hour)
42. Scott Boulevard and Central Expressway (PM peak hour)
43. Lafayette Street and Central Expressway (PM peak hour)
44. De La Cruz Boulevard and Central Expressway (AM and PM peak hours)
45. Agnew Road/De La Cruz Boulevard and Montague Expressway (AM and PM peak hours)
46. Lick Mill Boulevard and Montague Expressway (PM peak hour)
47. N. 1st Street and Montague Expressway (AM and PM peak hours)
48. Zanker Road and Montague Expressway (AM and PM peak hours)
49. Trimble Road and Montague Expressway (PM peak hour)
51. Lawrence Expressway and Kifer Road (AM and PM peak hours)
52. Lawrence Expressway and Reed Avenue/Monroe Street (AM and PM peak hours)
54. Lawrence Expressway and Pruneridge Avenue (AM peak hour)
57. Kiely Boulevard and Benton Street (PM peak hour)
58. Kiely Boulevard and Homestead Road (PM peak hour)
All other study intersections would operate at acceptable levels during both the AM and PM peak hours of traffic. The intersection level of service calculation sheets are included in Appendix C.
Freedom Circle Focus Area Plan and Greystar General Plan Amendment TA December 22, 2021 Page | 90
Table 14
Cumulative Intersection LOS without and with Focus Area Buildout
Incr. In Incr. In
Peak Avg Avg Crit. Crit. Avg
# Intersection Hour Delay LOS Delay LOS Delay V/C Delay LOS 1 Lawrence Expressway and Tasman Drive AM 66.5 E 64.2 E -10.7 -0.051 (CMP) PM 167.9 F 196.1 F 56.0 0.049
2 Lawrence Expwy and Sandia Av/Lakehaven Dr AM 135.1 F 158.0 F 49.8 0.156 PM OVFL F OVFL F OVFL 0.569
3 Lawrence Expressway and US 101 NB Ramps AM 11.7 B 11.9 B -0.3 0.029 PM 65.4 E 68.8 E 3.6 0.043
4 Lawrence Expressway and US 101 SB Ramps AM 19.2 B 32.1 C 21.0 0.091 PM 77.3 E 70.9 E -0.7 0.044
5 Lawrence Expressway and E. Arques Ave. AM 46.9 D 50.2 D 4.1 0.028 (CMP) PM 112.2 F 123.1 F 17.1 0.015
6 Patrick Henry Drive and Tasman Drive AM 61.0 E 82.4 F 40.6 0.089 PM 66.3 E 70.5 E -4.5 -0.008
7 Old Ironsides Drive and Tasman Drive AM 36.0 D 48.1 D 21.4 0.075 PM 47.7 D 64.6 E 9.7 0.066
8 Old Ironsides Drive and Old Glory Lane AM OVFL F OVFL F OVFL -65.584 66.8 E (Unsignalized) PM OVFL F OVFL F OVFL 0.085 121.7 F
9 Old Ironsides Drive and Patrick Henry Drive AM OVFL F 295.5 F -273.4 -10.339 (Unsignalized) PM OVFL F OVFL F -1992.0 -10.045
10 Great America Parkway and SR 237 WB Ramps AM 13.6 B 13.8 B 0.2 0.017 (CMP) PM 21.4 C 22.0 C 1.1 0.033
11 Great America Parkway and SR 237 EB Ramps AM 9.4 A 9.3 A 0.0 0.011 (CMP) PM 12.4 B 12.8 B 0.5 0.048
12 Great America Parkway and Great America Way AM 42.3 D 93.3 F 63.5 0.160 PM 67.6 E 91.5 F 30.3 0.056
13 Great America Pkwy and Old Mt View-Alviso Rd AM 16.9 B 18.4 B 2.0 0.076 PM 41.6 D 42.1 D 2.3 0.080
14 Great America Parkway and Bunker Hill Lane AM 11.7 B 11.6 B -0.2 -0.025 PM 25.7 C 30.1 C 5.9 0.063
15 Great America Parkway and Tasman Drive AM 48.0 D 48.6 D 4.8 0.024 (CMP) PM 52.7 D 54.0 D 4.5 0.009
16 Great America Parkway and Old Glory Lane AM 250.8 F OVFL F 49.9 0.112 50.6 D PM OVFL F OVFL F -3.3 -0.009 276.2 F
17 Great America Parkway and Patrick Henry Drive AM 275.9 F 234.4 F -73.1 -0.136 PM OVFL F OVFL F -59.4 -0.134
18 Great America Pkwy and Mission College Blvd AM 106.7 F 122.6 F 33.5 -0.276 90.3 F (CMP) PM 58.1 E 229.5 F 206.3 0.192 143.3 F
19 Great America Pkwy and US 101 NB Off Ramp AM 9.9 A 9.6 A 0.4 0.132 (CMP) PM 8.3 A 8.4 A 0.2 0.048
20 Bowers Avenue and US 101 SB Off Ramp AM 12.0 B 16.4 B 4.8 0.172 (CMP) PM 11.1 B 10.1 B -0.9 0.016
21 Bowers Avenue and Augustine Drive AM 28.6 C 28.7 C 0.6 0.060 PM 41.4 D 41.1 D -0.5 -0.008
22 Bowers Avenue and Scott Boulevard AM 60.3 E 60.6 E 3.9 -0.013 (CMP) PM 49.5 D 49.3 D -0.2 0.002
23 Bowers Avenue and Central Expressway AM 98.6 F 93.7 F -7.6 0.013 93.4 F (CMP) PM 126.5 F 129.7 F -8.5 -0.025 128.7 F
24 Bowers Avenue and Kifer Road/Walsh Avenue AM 39.2 D 38.8 D -0.3 0.012 PM 46.1 D 48.7 D 4.1 0.023
25 Mission College Loop and Mission College Blvd AM 12.6 B 12.4 B -0.6 -0.008 PM 23.2 C 21.5 C 0.6 0.069
Cumulative (2040) Conditions
With Project
Freedom Circle Buildout
(including Greystar)
w/ Improv & 10% TDM
No Project Freedom Circle Buildout
(including Greystar)
Freedom Circle Focus Area Plan and Greystar General Plan Amendment TA December 22, 2021 Page | 91
Table 14 (cont.)
Cumulative Intersection LOS without and with Focus Area Buildout Incr. In Incr. In
Peak Avg Avg Crit. Crit. Avg
# Intersection Hour Delay LOS Delay LOS Delay V/C Delay LOS 26 Marriott Dwy and Mission College Blvd AM 10.4 B 25.7 C 21.2 0.112 PM 18.0 B 25.8 C 8.9 0.018
27 Freedom Circle W and Mission College Blvd AM 11.0 B 73.6 E 90.8 0.450 49.5 D PM 32.0 C 168.8 F 196.4 0.456 36.0 D
28 Agnew/Freedom Circle E & Mission College Blvd AM 37.2 D 45.1 D 15.8 0.043 32.5 C PM 38.5 D 223.3 F 272.6 0.731 68.9 E
29 Great America employee entrance and Agnew Rd AM 3.5 A 4.7 A 1.7 0.151 PM 5.4 A 41.8 D 43.9 0.406
30 Juliette Lane and Mission College Boulevard AM 12.1 B 21.3 C 11.5 0.139 PM 22.0 C 22.2 C 0.3 0.055
31 Burton Drive and Mission College Boulevard AM 24.8 C 26.0 C 1.9 0.026 PM 18.6 B 18.7 B 0.0 0.001
32 Mission College Blvd and Montague Expwy AM 126.8 F 140.8 F 23.7 0.085 (CMP) PM 121.9 F 133.0 F 21.0 0.118
33 San Tomas Expressway and Scott Boulevard AM 166.3 F 156.3 F -22.2 0.022 (CMP) PM 66.6 E 69.8 E 5.7 0.021
34 San Tomas Expressway and Monroe Street AM 59.1 E 62.2 E 4.0 -0.004 (CMP) PM 53.3 D 54.8 D -0.2 0.010
35 San Tomas Expressway and El Camino Real AM 100.6 F 102.4 F 3.5 0.002 (CMP) PM 120.3 F 123.2 F 6.2 0.005
36 Convention Center and Tasman Drive AM 13.1 B 13.4 B 0.3 0.033 PM 14.4 B 14.8 B 0.8 0.028
37 Centennial Boulevard and Tasman Drive AM 35.3 D 36.3 D -2.0 -0.022 PM 41.6 D 42.1 D -1.2 -0.004
38 Calle Del Sol and Tasman Drive AM 26.3 C 24.6 C -2.4 0.014 PM 24.6 C 19.8 B -4.3 0.009
39 Lick Mill Boulevard and Tasman Drive AM 112.7 F 124.4 F 22.4 0.050 PM 79.4 E 98.0 F 52.7 0.141
40 Lafayette Street and Calle De Luna AM 22.4 C 22.3 C 0.0 0.021 PM 24.3 C 25.6 C -7.0 0.017
41 Lafayette Street and Agnew Road AM 42.5 D 63.7 E 31.7 0.059 PM 78.2 E 119.3 F 87.9 0.176
42 Scott Boulevard and Central Expressway AM 71.8 E 79.7 E 14.7 0.047 (CMP) PM 108.5 F 116.4 F 5.7 0.015
43 Lafayette Street and Central Expressway AM 55.9 E 57.7 E -1.3 0.020 (CMP) PM 81.5 F 82.9 F -1.7 0.019
44 De la Cruz Boulevard and Central Expressway AM 108.3 F 117.0 F 11.6 0.025 (CMP) PM 229.5 F 232.8 F 6.5 0.007
45 Agnew Rd/De La Cruz Blvd and Montague Expwy AM 116.8 F 99.9 F -23.4 -0.057 (CMP) PM 137.7 F 138.1 F -1.1 0.040
46 Lick Mill Boulevard and Montague Expressway AM 69.0 E 74.3 E 10.4 0.011 PM 104.8 F 131.7 F 46.7 0.033
47 N. 1st Street and Montague Expressway AM 187.9 F 197.9 F 17.6 0.027 (CMP) PM 179.7 F 147.0 F -34.0 0.117
Cumulative (2040) Conditions
With Project
Freedom Circle Buildout
(including Greystar)
w/ Improv & 10% TDM
No Project Freedom Circle Buildout
(including Greystar)
Freedom Circle Focus Area Plan and Greystar General Plan Amendment TA December 22, 2021 Page | 92
Table 14 (cont.)
Cumulative Intersection LOS without and with Focus Area Buildout
Incr. In Incr. In
Peak Avg Avg Crit. Crit. Avg
# Intersection Hour Delay LOS Delay LOS Delay V/C Delay LOS 48 Zanker Road and Montague Expressway AM 80.8 F 80.7 F -1.4 0.000 (CMP) PM 74.4 E 64.7 E -19.3 -0.069
49 Trimble Road and Montague Expressway AM 42.3 D 41.1 D 0.1 0.001 (CMP) PM 150.6 F 156.7 F 17.9 -0.016
50 McCarthy Blvd/O'Toole Av and Montague Expwy AM -- -- -- -- -- -- -- (CMP) PM -- -- -- -- -- -- --
51 Lawrence Expressway and Kifer Road AM 190.5 F 194.2 F 7.9 0.009 PM 221.1 F 219.4 F -1.2 -0.015
52 Lawrence Expressway and Reed Ave/Monroe St AM 123.3 F 134.2 F 14.5 0.038 (CMP) PM 87.2 F 86.4 F -2.7 0.012
53 Lawrence Expressway and Homestead Road AM 53.5 D 55.6 E 4.0 0.034 (CMP) PM 76.7 E 76.8 E 0.4 0.010
54 Lawrence Expressway and Pruneridge Avenue AM 94.5 F 101.0 F 9.6 0.022 PM 73.3 E 72.0 E -3.6 0.010
55 Bowers Avenue and Monroe Street AM 32.1 C 32.4 C 0.4 0.004 PM 36.0 D 37.1 D 0.7 0.005
56 Bowers Ave/Kiely Boulevard and El Camino Real AM 30.2 C 30.2 C -0.1 0.010 (CMP) PM 33.4 C 34.0 C 1.0 0.008
57 Kiely Boulevard and Benton Street AM 41.8 D 42.0 D 0.4 0.008 PM 63.0 E 68.3 E 8.2 0.023
58 Kiely Boulevard and Homestead Road AM 42.6 D 43.6 D 1.7 0.014 PM 76.8 E 83.7 F 10.2 0.027
Notes:
Bold indicates a substandard level of service.
Bold indicates an adverse effect caused by the project.
OVFL indicates that the result is out of software calculation limits.
Cumulative (2040) Conditions
With Project
Freedom Circle Buildout
(including Greystar)
w/ Improv & 10% TDM
No Project Freedom Circle Buildout
(including Greystar)
Freedom Circle Focus Area Plan and Greystar General Plan Amendment TA December 22, 2021 Page | 93
Cumulative Plus Project Intersection Levels of Service Without Greystar This scenario reflects full buildout of the Freedom Circle Focus Area with the exception of the Greystar site, which would remain vacant. This scenario was developed as the baseline to identify the adverse effects attributable to the development of the Greystar General Plan Amendment. The results of the intersection level of service analysis under cumulative plus project conditions without Greystar show that the following 35 intersections would operate at an unacceptable level during at least one peak hour (see Table 15):
1. Lawrence Expressway and Tasman Drive (PM peak hour)
2. Lawrence Expressway and Sandia Avenue/Lakehaven Drive (AM and PM peak hours)
5. Lawrence Expressway and E. Arques Avenue (PM peak hour)
6. Patrick Henry Drive and Tasman Drive (AM and PM peak hours)
7. Old Ironsides Drive and Tasman Drive (PM peak hour)
8. Old Ironsides Drive and Old Glory Lane (AM and PM peak hours)
9. Old Ironsides Drive and Patrick Henry Drive (AM and PM peak hours)
12. Great America Parkway and Great America Way (AM and PM peak hours)
16. Great America Parkway and Old Glory Lane (AM and PM peak hours)
17. Great America Parkway and Patrick Henry Drive (AM and PM peak hours)
18. Great America Parkway and Mission College Boulevard (AM and PM peak hours)
23. Bowers Avenue and Central Expressway (AM and PM peak hours)
25. Mission College Loop and Mission College Boulevard (PM peak hour)
27. Freedom Circle (W) and Mission College Boulevard (AM and PM peak hours)
28. Agnew Road/Freedom Circle (E) and Mission College Boulevard (PM peak hour)
32. Mission College Boulevard and Montague Expressway (AM and PM peak hours)
33. San Tomas Expressway and Scott Boulevard (AM peak hour)
35. San Tomas Expressway and El Camino Real (AM and PM peak hours)
39. Lick Mill Boulevard and Tasman Drive (AM and PM peak hours)
41. Lafayette Street and Agnew Road (AM and PM peak hours)
42. Scott Boulevard and Central Expressway (PM peak hour)
43. Lafayette Street and Central Expressway (PM peak hour)
44. De La Cruz Boulevard and Central Expressway (AM and PM peak hours)
45. Agnew Road/De La Cruz Boulevard and Montague Expressway (AM and PM peak hours)
46. Lick Mill Boulevard and Montague Expressway (PM peak hour)
47. N. 1st Street and Montague Expressway (AM and PM peak hours)
48. Zanker Road and Montague Expressway (AM and PM peak hours)
49. Trimble Road and Montague Expressway (PM peak hour)
51. Lawrence Expressway and Kifer Road (AM and PM peak hours)
52. Lawrence Expressway and Monroe Street (AM and PM peak hours)
54. Lawrence Expressway and Pruneridge Avenue (AM peak hour)
57. Kiely Boulevard and Benton Street (PM peak hour)
58. Kiely Boulevard and Homestead Road (PM peak hour)
All other study intersections would operate at acceptable levels during both the AM and PM peak hours of traffic. The intersection level of service calculation sheets are included in Appendix C.
Freedom Circle Focus Area Plan and Greystar General Plan Amendment TA December 22, 2021 Page | 94
Table 15
Cumulative Intersection LOS without and with Greystar
Incr. In Incr. In
Peak Avg Avg Crit. Crit. Avg
# Intersection Hour Delay LOS Delay LOS Delay V/C Delay LOS 1 Lawrence Expressway and Tasman Drive AM 64.1 E 64.2 E -0.2 0.001 (CMP) PM 195.7 F 196.1 F 0.4 0.006
2 Lawrence Expwy and Sandia Av/Lakehaven Dr AM 158.8 F 158.0 F 1.4 0.002 PM OVFL F OVFL F 3.7 0.010
3 Lawrence Expressway and US 101 NB Ramps AM 11.9 B 11.9 B -0.1 -0.005 PM 70.1 E 68.8 E -2.3 0.002
4 Lawrence Expressway and US 101 SB Ramps AM 31.3 C 32.1 C 1.3 0.000 PM 69.8 E 70.9 E 2.9 0.005
5 Lawrence Expressway and E. Arques Ave. AM 50.4 D 50.2 D -0.1 0.000 (CMP) PM 123.7 F 123.1 F -0.7 -0.001
6 Patrick Henry Drive and Tasman Drive AM 82.0 F 82.4 F 0.3 0.001 PM 70.0 E 70.5 E 1.7 0.005
7 Old Ironsides Drive and Tasman Drive AM 47.2 D 48.1 D 1.6 0.004 PM 62.1 E 64.6 E 4.0 0.011 64.5 E
8 Old Ironsides Drive and Old Glory Lane AM OVFL F OVFL F OVFL 1.752 67.4 E (Unsignalized) PM OVFL F OVFL F OVFL -0.025 122.1 F
9 Old Ironsides Drive and Patrick Henry Drive AM 298.5 F 295.5 F -3.1 -0.142 (Unsignalized) PM OVFL F OVFL F -19.5 -0.065
10 Great America Parkway and SR 237 WB Ramps AM 13.8 B 13.8 B 0.0 -0.001 (CMP) PM 21.9 C 22.0 C 0.1 0.003
11 Great America Parkway and SR 237 EB Ramps AM 9.3 A 9.3 A 0.0 0.000 (CMP) PM 12.8 B 12.8 B 0.1 0.003
12 Great America Parkway and Great America Way AM 100.9 F 93.3 F -8.7 -0.017 PM 89.0 F 91.5 F 3.0 0.008
13 Great America Pkwy and Old Mt View-Alviso Rd AM 18.5 B 18.4 B -0.1 -0.003 PM 42.1 D 42.1 D 0.2 0.005
14 Great America Parkway and Bunker Hill Lane AM 11.6 B 11.6 B 0.0 0.001 PM 29.3 C 30.1 C 1.0 0.009
15 Great America Parkway and Tasman Drive AM 48.7 D 48.6 D 0.2 0.009 (CMP) PM 54.8 D 54.0 D -2.1 -0.006
16 Great America Parkway and Old Glory Lane AM OVFL F OVFL F -0.7 -0.001 PM OVFL F OVFL F 1.6 0.004
17 Great America Parkway and Patrick Henry Drive AM 224.4 F 234.4 F 14.5 0.032 89.2 F PM OVFL F OVFL F 5.8 0.013 284.8 F
18 Great America Pkwy and Mission College Blvd AM 115.4 F 122.6 F 14.2 0.028 90.3 F (CMP) PM 220.0 F 229.5 F 20.1 0.034 143.3 F
19 Great America Pkwy and US 101 NB Off Ramp AM 9.6 A 9.6 A 0.0 0.000 (CMP) PM 8.4 A 8.4 A 0.0 -0.001
20 Bowers Avenue and US 101 SB Off Ramp AM 16.6 B 16.4 B 0.0 0.004 (CMP) PM 9.2 A 10.1 B 0.8 0.010
21 Bowers Avenue and Augustine Drive AM 27.6 C 28.7 C 2.3 0.018 PM 40.8 D 41.1 D 0.4 0.004
22 Bowers Avenue and Scott Boulevard AM 60.0 E 60.6 E 0.5 -0.013 (CMP) PM 48.8 D 49.3 D 0.8 0.004
23 Bowers Avenue and Central Expressway AM 93.8 F 93.7 F -0.1 -0.001 (CMP) PM 129.6 F 129.7 F 0.3 0.003
24 Bowers Avenue and Kifer Road/Walsh Avenue AM 39.2 D 38.8 D -0.6 -0.005 PM 47.5 D 48.7 D 2.1 0.011
25 Mission College Loop and Mission College Blvd AM 12.6 B 12.4 B -0.6 0.014 PM 21.4 C 21.5 C 0.0 0.001
Freedom Circle
(without
Greystar)
Freedom Circle Buildout
(including Greystar)
Freedom Circle Buildout
(including Greystar)
w/ Improv & 10% TDM
Cumulative (2040) Conditions
Freedom Circle Focus Area Plan and Greystar General Plan Amendment TA December 22, 2021 Page | 95
Table 15 (cont.)
Cumulative Intersection LOS without and with Greystar
Incr. In Incr. In
Peak Avg Avg Crit. Crit. Avg
# Intersection Hour Delay LOS Delay LOS Delay V/C Delay LOS 26 Marriott Dwy and Mission College Blvd AM 23.5 C 25.7 C 3.4 0.029 PM 26.1 C 25.8 C 0.3 0.016
27 Freedom Circle W and Mission College Blvd AM 64.4 E 73.6 E 14.1 0.041 49.5 D PM 151.7 F 168.8 F 24.3 0.052 36.0 D
28 Agnew/Freedom Circle E & Mission College Blvd AM 40.8 D 45.1 D 6.7 0.056 33.6 C PM 213.2 F 223.3 F 14.4 0.033 85.5 F
29 Great America employee entrance and Agnew Rd AM 4.7 A 4.7 A 0.1 0.004 PM 39.7 D 41.8 D 2.6 0.009
30 Juliette Lane and Mission College Boulevard AM 20.4 C 21.3 C 0.9 0.000 PM 22.6 C 22.2 C 0.0 0.001
31 Burton Drive and Mission College Boulevard AM 26.1 C 26.0 C -0.1 -0.001 PM 18.8 B 18.7 B 0.0 0.000
32 Mission College Blvd and Montague Expwy AM 135.7 F 140.8 F 7.4 0.023 (CMP) PM 130.9 F 133.0 F 3.7 0.016
33 San Tomas Expressway and Scott Boulevard AM 152.7 F 156.3 F 6.7 0.004 (CMP) PM 69.1 E 69.8 E 1.3 0.002
34 San Tomas Expressway and Monroe Street AM 62.8 E 62.2 E -1.3 -0.005 (CMP) PM 54.9 D 54.8 D -6.6 -0.102
35 San Tomas Expressway and El Camino Real AM 103.8 F 102.4 F -2.0 -0.004 (CMP) PM 123.4 F 123.2 F -0.3 -0.003
36 Convention Center and Tasman Drive AM 13.4 B 13.4 B 0.1 0.004 PM 14.8 B 14.8 B 0.0 0.000
37 Centennial Boulevard and Tasman Drive AM 36.0 D 36.3 D -2.8 -0.035 PM 42.0 D 42.1 D 0.9 0.005
38 Calle Del Sol and Tasman Drive AM 24.6 C 24.6 C 0.0 0.003 PM 19.8 B 19.8 B 0.0 0.001
39 Lick Mill Boulevard and Tasman Drive AM 123.9 F 124.4 F 0.6 0.001 PM 97.2 F 98.0 F 0.5 0.001
40 Lafayette Street and Calle De Luna AM 22.4 C 22.3 C 0.0 0.000 PM 25.6 C 25.6 C 0.1 0.002
41 Lafayette Street and Agnew Road AM 61.9 E 63.7 E 3.0 0.008 PM 116.8 F 119.3 F 4.3 0.008
42 Scott Boulevard and Central Expressway AM 79.5 E 79.7 E 0.4 0.003 (CMP) PM 114.4 F 116.4 F 1.8 0.004
43 Lafayette Street and Central Expressway AM 57.7 E 57.7 E 0.3 0.004 (CMP) PM 83.0 F 82.9 F -1.6 -0.001
44 De la Cruz Boulevard and Central Expressway AM 119.1 F 117.0 F -2.6 -0.002 (CMP) PM 231.6 F 232.8 F 1.4 0.003
45 Agnew Rd/De La Cruz Blvd and Montague Expwy AM 98.9 F 99.9 F -0.2 -0.002 (CMP) PM 136.9 F 138.1 F 1.2 0.003
46 Lick Mill Boulevard and Montague Expressway AM 73.1 E 74.3 E 2.1 0.004 PM 129.4 F 131.7 F 4.0 0.003
47 N. 1st Street and Montague Expressway AM 198.1 F 197.9 F 0.5 0.003 (CMP) PM 145.6 F 147.0 F 1.3 0.003
Freedom Circle
(without
Greystar)
Freedom Circle Buildout
(including Greystar)
Freedom Circle Buildout
(including Greystar)
w/ Improv & 10% TDM
Cumulative (2040) Conditions
Freedom Circle Focus Area Plan and Greystar General Plan Amendment TA December 22, 2021 Page | 96
Table 15 (cont.)
Cumulative Intersection LOS without and with Greystar
Cumulative Plus Project Intersection Levels of Service Including Greystar The following study intersections would operate at unacceptable levels of service under cumulative plus project conditions including Greystar.
1. Lawrence Expressway and Tasman Drive (PM peak hour)
2. Lawrence Expressway and Sandia Avenue/Lakehaven Drive (AM and PM peak hours)
5. Lawrence Expressway and E. Arques Avenue (PM peak hour)
6. Patrick Henry Drive and Tasman Drive (AM and PM peak hours)
7. Old Ironsides Drive and Tasman Drive (PM peak hour)
8. Old Ironsides Drive and Old Glory Lane (AM peak hour)
12. Great America Parkway and Great America Way (AM and PM peak hours)
16. Great America Parkway and Old Glory Lane (AM and PM peak hours)
17. Great America Parkway and Patrick Henry Drive (AM and PM peak hours)
18. Great America Parkway and Mission College Boulevard (AM and PM peak hours)
23. Bowers Avenue and Central Expressway (AM and PM peak hours)
27. Freedom Circle (W) and Mission College Boulevard (AM and PM peak hours)
28. Agnew Road/Freedom Circle (E) and Mission College Boulevard (PM peak hour)
32. Mission College Boulevard and Montague Expressway (AM and PM peak hours)
33. San Tomas Expressway and Scott Boulevard (AM peak hour) Incr. In Incr. In
Peak Avg Avg Crit. Crit. Avg
# Intersection Hour Delay LOS Delay LOS Delay V/C Delay LOS 48 Zanker Road and Montague Expressway AM 81.7 F 80.7 F -1.5 -0.001 (CMP) PM 65.3 E 64.7 E -1.1 -0.003
49 Trimble Road and Montague Expressway AM 40.7 D 41.1 D -0.1 -0.001 (CMP) PM 155.7 F 156.7 F 1.0 0.000
50 McCarthy Blvd/O'Toole Av and Montague Expwy AM -- -- -- -- -- -- -- (CMP) PM -- -- -- -- -- -- --
51 Lawrence Expressway and Kifer Road AM 193.9 F 194.2 F 0.0 -0.002 PM 217.4 F 219.4 F 2.8 0.005
52 Lawrence Expressway and Reed Ave/Monroe St AM 134.8 F 134.2 F -1.1 -0.004 (CMP) PM 85.4 F 86.4 F 3.0 0.009
53 Lawrence Expressway and Homestead Road AM 55.6 E 55.6 E 0.1 0.000 (CMP) PM 75.8 E 76.8 E 2.1 0.009
54 Lawrence Expressway and Pruneridge Avenue AM 101.2 F 101.0 F -0.5 -0.001 PM 71.6 E 72.0 E 0.6 0.002
55 Bowers Avenue and Monroe Street AM 33.1 C 32.4 C -1.0 -0.021 PM 36.9 D 37.1 D 0.0 0.001
56 Bowers Ave/Kiely Boulevard and El Camino Real AM 30.4 C 30.2 C -0.3 -0.004 (CMP) PM 33.7 C 34.0 C 0.5 0.006
57 Kiely Boulevard and Benton Street AM 48.7 D 42.0 D -9.6 -0.093 PM 66.3 E 68.3 E 3.2 0.009
58 Kiely Boulevard and Homestead Road AM 51.9 D 43.6 D -13.1 -0.078 PM 83.7 F 83.7 F 0.0 0.000
Notes:
Bold indicates a substandard level of service.
Bold indicates an adverse effect caused by the project.
OVFL indicates that the result is out of software calculation limits.
Freedom Circle
(without
Greystar)
Freedom Circle Buildout
(including Greystar)
Freedom Circle Buildout
(including Greystar)
w/ Improv & 10% TDM
Cumulative (2040) Conditions
Freedom Circle Focus Area Plan and Greystar General Plan Amendment TA December 22, 2021 Page | 97
35. San Tomas Expressway and El Camino Real (AM and PM peak hours)
39. Lick Mill Boulevard and Tasman Drive (AM and PM peak hours)
41. Lafayette Street and Agnew Road (AM and PM peak hours)
42. Scott Boulevard and Central Expressway (PM peak hour)
43. Lafayette Street and Central Expressway (PM peak hour)
44. De La Cruz Boulevard and Central Expressway (AM and PM peak hours)
45. Agnew Road/De La Cruz Boulevard and Montague Expressway (AM and PM peak hours)
46. Lick Mill Boulevard and Montague Expressway (PM peak hour)
47. N. 1st Street and Montague Expressway (AM and PM peak hours)
48. Zanker Road and Montague Expressway (AM and PM peak hours)
49. Trimble Road and Montague Expressway (PM peak hour)
51. Lawrence Expressway and Kifer Road (AM and PM peak hours)
52. Lawrence Expressway and Monroe Street (AM and PM peak hours)
54. Lawrence Expressway and Pruneridge Avenue (AM peak hour)
57. Kiely Boulevard and Benton Street (PM peak hour)
58. Kiely Boulevard and Homestead Road (PM peak hour)
The intersection level of service calculation sheets are included in Appendix C. The intersection levels of service under cumulative plus project conditions including Greystar were compared against cumulative no project conditions to identify the adverse effects attributable to the full buildout of the Freedom Circle Focus Area.
Compared to results under cumulative no project conditions, buildout of the Freedom Circle Focus Area would cause adverse effects at the following 26 intersections (see Table 14):
1. Lawrence Expressway and Tasman Drive (PM peak hour)
2. Lawrence Expressway and Sandia Avenue/Lakehaven Drive (AM and PM peak hours)
5. Lawrence Expressway and E. Arques Avenue (PM peak hour)
6. Patrick Henry Drive and Tasman Drive (AM peak hour)
7. Old Ironsides Drive and Tasman Drive (PM peak hour)
8. Old Ironsides Drive and Old Glory Lane (PM peak hour)
12. Great America Parkway and Great America Way (AM and PM peak hours)
16. Great America Parkway and Old Glory Lane (AM peak hour)
18. Great America Parkway and Mission College Boulevard (PM peak hour)
23. Bowers Avenue and Central Expressway (AM peak hour)
27. Freedom Circle (W) and Mission College Boulevard (AM and PM peak hours)
28. Agnew Road/Freedom Circle (E) and Mission College Boulevard (PM peak hour)
32. Mission College Boulevard and Montague Expressway (AM peak hour)
33. San Tomas Expressway and Scott Boulevard (AM peak hour)
39. Lick Mill Boulevard and Tasman Drive (AM and PM peak hours)
41. Lafayette Street and Agnew Road (AM and PM peak hours)
42. Scott Boulevard and Central Expressway (PM peak hour)
43. Lafayette Street and Central Expressway (PM peak hour)
44. De La Cruz Boulevard and Central Expressway (AM peak hour)
45. Agnew Road/De La Cruz Boulevard and Montague Expressway (PM peak hour)
46. Lick Mill Boulevard and Montague Expressway (PM peak hour)
47. N. 1st Street and Montague Expressway (AM and PM peak hours)
52. Lawrence Expressway and Monroe Street (AM peak hour)
54. Lawrence Expressway and Pruneridge Avenue (AM peak hour)
57. Kiely Boulevard and Benton Street (PM peak hour)
58. Kiely Boulevard and Homestead Road (PM peak hour)
Freedom Circle Focus Area Plan and Greystar General Plan Amendment TA December 22, 2021 Page | 98
The intersection levels of service under cumulative plus project conditions including Greystar were compared against cumulative plus project conditions without Greystar to identify adverse effects attributable to the development of the Greystar General Plan Amendment. Compared to the results under cumulative plus project conditions without Greystar, the Greystar General Plan Amendment would cause adverse effects at the following seven intersections: (see Table 15).
7. Old Ironsides Drive and Tasman Drive (PM peak hour)
8. Old Ironsides Drive and Old Glory Lane (AM peak hour)
17. Great America Parkway and Patrick Henry Drive (AM and PM peak hours)
18. Great America Parkway and Mission College Boulevard (AM and PM peak hours)
27. Freedom Circle (W) and Mission College Boulevard (AM and PM peak hours)
28. Agnew Road/Freedom Circle (E) and Mission College Boulevard (PM peak hour)
32. Mission College Boulevard and Montague Expressway (AM and PM peak hours) The adverse effects and proposed improvements to alleviate the deficiencies for Greystar only and for Freedom Circle buildout are described below.
Adverse Effects and Recommended Improvements Solely for Greystar This section discusses the adverse effects solely attributable to the development of the Greystar site under cumulative conditions and proposed improvements to address the deficiencies. It should be noted that adverse effects on intersection operations do not constitute significant impacts under CEQA.
The Greystar development will include TDM measures to achieve a 10 percent reduction in VMT per the City’s Climate Action Plan. A sensitivity analysis was conducted to determine if a reduction in project vehicle trips due to TDM would avoid any of the adverse effects at study intersections.
7. Old Ironsides Drive and Tasman Drive
This City of Santa Clara intersection would operate at an unacceptable LOS E cumulative plus project conditions without Greystar during the PM peak hour. The development of the Greystar site would cause the intersection’s average critical movement delay to increase by more than 4.0 seconds and the critical v/c to increase by more than 0.01. This constitutes an adverse effect on intersection operations.
Intersection operations could be improved by installing a second westbound left-turn lane and a second northbound right-turn lane. The addition of a second westbound left-turn lane is considered to be infeasible as it would require the acquisition of additional right of way on the northeast quadrant of the intersection. Furthermore, as described above, dual northbound right-turn lanes are not recommended because they would adversely affect cyclists and pedestrians and conflict with City policies.
Implementation of TDM measures within the Freedom Circle Focus Area could reduce the vehicle trips associated with the Focus Area development. A sensitivity analysis shows that a 10 percent TDM trip reduction within the Focus Area would cause a decrease in critical v/c ratio such that the project would not be considered to have an adverse effect on intersection operations. Thus, TDM measures are expected to be sufficient to avoid the adverse effect without any physical improvements at this intersection.
8. Old Ironsides Drive and Old Glory Lane
This unsignalized intersection in the City of Santa Clara would operate at an unacceptable LOS F under cumulative plus project conditions without Greystar during the AM and PM peak hours. The poor level of service is due to the trips associated with buildout of the Patrick Henry Specific Plan and the proposed Kylli mixed-use development, which would have access via the west leg at this intersection.
Freedom Circle Focus Area Plan and Greystar General Plan Amendment TA December 22, 2021 Page | 99
The development of the Greystar site would exacerbate the deficiency at this intersection. Furthermore, the intersection is expected to satisfy the peak-hour signal warrant. This constitutes an adverse effect on intersection operations.
Intersection operations could be improved by installing a traffic signal, adding a second southbound left-turn lane, a second eastbound through lane, an exclusive northbound right-turn lane, an exclusive eastbound right-turn lane, and an exclusive westbound left-turn lane. With the recommended improvements and a 10 percent TDM reduction, the intersection would continue to operate at an unacceptable LOS E or LOS F, however the delay would be less than that under cumulative plus project conditions without Greystar. Greystar should provide fair-share funding towards this improvement.
17. Great America Parkway and Patrick Henry Drive
This City of Santa Clara intersection would operate at an unacceptable LOS F under cumulative plus project conditions without Greystar during the AM and PM peak hours. The development of the Greystar site would cause the intersection’s average critical movement delay to increase by more than
4.0 seconds and the critical v/c to increase by more than 0.01 during both AM and PM peak hours. This constitutes an adverse effect on intersection operations.
Intersection operations could be improved by constructing a second northbound left-turn lane. While the intersection is expected to operate at an unacceptable LOS F during the AM and PM peak hours with the recommended dual northbound left-turn lanes and a 10 percent TDM reduction, the average delay would be less than under cumulative plus project without Greystar conditions. Thus, the recommended improvement plus TDM measures would be sufficient to fully offset the adverse effect on intersection operations. Greystar should provide fair-share funding towards this improvement.
18. Great America Parkway and Mission College Boulevard This CMP intersection in the City of Santa Clara would operate at an unacceptable LOS F under cumulative plus project conditions without Greystar during the AM and PM peak hours. The development of the Greystar site would cause the intersection’s average critical movement delay to increase by more than 4.0 seconds and the critical v/c to increase by more than 0.01 during the AM and PM peak hours. This constitutes an adverse effect on intersection operations.
Implementation of TDM measures within the Greystar site could reduce the vehicle trips associated with the development. However, a sensitivity analysis shows that a 10 percent TDM trip reduction for Greystar would not be sufficient to avoid the adverse effect on intersection operations.
The adverse effect at this intersection could be lessened by converting Hichborn Drive from one-way (eastbound only) flow to two-way flow with a 60-foot right-of-way width, adding a traffic signal at Great America Parkway and Hichborn Drive to allow left and right in and out, and synchronizing the new signal with the traffic signal at Great America Parkway and Mission College Boulevard. In addition, the US 101 northbound off-ramp right turn to northbound Great America Parkway would be modified to reduce the curb radius to 50 feet. With the recommended improvements and a 10 percent TDM reduction, the intersection is expected to continue to operate an unacceptable LOS F during the AM and PM peak hours. However, the average delay would decrease compared to cumulative plus project conditions without Greystar. Thus, the recommended improvements plus TDM measures would be sufficient to fully offset the adverse effect on intersection operations. Greystar should provide fair-share funding towards the improvements at Great America Parkway and Hichborn Drive.
Freedom Circle Focus Area Plan and Greystar General Plan Amendment TA December 22, 2021 Page | 100
27. Freedom Circle (W) and Mission College Boulevard
This City of Santa Clara intersection would operate at an unacceptable LOS E and F under cumulative plus project conditions without Greystar during the AM and PM peak hours, respectively. The development of the Greystar site would cause the intersection’s average critical movement delay to increase by more than 4.0 seconds and the critical v/c to increase by more than 0.01 during the AM and PM peak hours. This constitutes an adverse effect on intersection operations.
Intersection operations could be improved by adding an eastbound right-turn, removing the crosswalk on the eastbound leg, relocating bus stops to the east side of the intersection, restriping the northbound approach for one right-turn lane, one shared through/left-turn lane and one left-turn lane, and implementing split-phase signal control on the north and south legs. The construction of these improvements along with the planned Class IV separated bike lanes on Mission College Boulevard would require widening Mission College Boulevard and require the dedication of additional right of way on the east side of the intersection. The dedication is required to install a far side bus stop and near side bus stop in accordance with VTA Bus Stop and Passenger Facilities Standards. Intersection operations could be further improved by the proposed improvements at Great America Parkway and Hichborn Drive: converting Hichborn Drive from one-way (eastbound only) flow to two-way flow and adding a traffic signal at Great America Parkway and Hichborn Drive to allow left and right turns in and out. This roadway network change would provide another route out of the Freedom Circle Focus Area and thus reduce the northbound left-turn volume at the Freedom Circle W/Mission College Boulevard intersection. With the recommended improvements on the eastbound and northbound approaches, improvements at Great America Parkway and Hichborn Drive, and a 10 percent TDM reduction, the intersection is expected to operate an acceptable LOS D during both the AM and PM peak hours. Thus, the recommended improvements plus TDM measures would be sufficient to fully offset the adverse effect on intersection operations. Greystar should provide fair-share funding towards these improvements.
28. Agnew Road/Freedom Circle (E) and Mission College Boulevard This City of Santa Clara intersection would operate at an unacceptable LOS F under cumulative plus project conditions without Greystar during the PM peak hour. The development of the Greystar site would cause the intersection’s average critical movement delay to increase by more than 4.0 seconds and the critical v/c to increase by more than 0.01 during the PM peak hour. This constitutes an adverse effect on intersection operations.
Intersection operations could be improved by adding a second eastbound left-turn lane and widening the northbound approach to include one left-turn lane, one through lane, and two right-turn lanes. The addition of a second lane on the north leg (Agnew Road) to receive the dual eastbound left-turn lanes would require the dedication of right of way from adjacent properties within the Freedom Circle Focus Area and/or narrowing the sidewalk and thus is considered to be infeasible. Furthermore, as described above, dual right-turn lanes are not recommended as they would adversely affect cyclists and pedestrians and conflict with City of Santa Clara policies. Thus, only the addition of a single northbound right-turn lane is recommended. While the intersection would continue to operate at LOS F during the PM peak hour with the recommended improvement on the northbound approach and a 10 percent TDM reduction, the average delay would be less than under cumulative plus project conditions without Greystar. Thus, the recommended improvement plus TDM measures would be sufficient to fully offset the adverse effect on intersection operations. Greystar should provide fair-share funding towards this improvement.
Freedom Circle Focus Area Plan and Greystar General Plan Amendment TA December 22, 2021 Page | 101
32. Mission College Boulevard and Montague Expressway
This CMP intersection in the City of Santa Clara would operate at an unacceptable LOS F under cumulative plus project conditions without Greystar during the AM peak hour. During the AM peak hour, the intersection’s average critical movement delay would increase by more than 4.0 seconds and the critical v/c would increase by more the 0.010. This constitutes an adverse effect on intersection operations.
Implementation of TDM measures within the Greystar site could reduce the vehicle trips associated with the development. However, a sensitivity analysis shows that a 10 percent TDM trip reduction for Greystar would not be sufficient to avoid the adverse effect on intersection operations.
Intersection operations could be improved by constructing a partial grade separation with a flyover from eastbound Montague Expressway to northbound Mission College Boulevard. This improvement was identified as part of the 2040 Expressway Plan. Greystar should provide fair-share funding towards this improvement. The funds collected for this improvement are subject to programming by the County for Board-approved projects.
Adverse Effects and Recommended Improvements for Focus Area Buildout This section discusses the adverse effects associated with buildout of the Freedom Circle Focus Area under cumulative conditions and proposed improvements to address the deficiencies. It should be noted that adverse effects on intersection operations do not constitute significant impacts under CEQA.
The Freedom Circle Focus Area will include TDM measures to achieve a 10 percent reduction in VMT per the City’s Climate Action Plan. A sensitivity analysis was conducted to determine if a reduction in project vehicle trips due to TDM would avoid any of the adverse effects at study intersections.
1. Lawrence Expressway and Tasman Drive
This CMP intersection in the City of Sunnyvale would operate at an unacceptable LOS F under cumulative no project conditions during the PM peak hour. The buildout of the Freedom Circle Focus Area would cause the intersection’s average critical movement delay to increase by more than 4.0 seconds and the critical v/c to increase by more than 0.01. This constitutes an adverse effect on intersection operations.
Operation of the Lawrence/Tasman intersection could be improved by adding a westbound right-turn lane. However, this improvement is not feasible since it would require acquisition of additional right of way and result in a significant loss of parking on the adjacent commercial development. Implementation of TDM measures within the Freedom Circle Focus Area could reduce the vehicle trips associated with the Focus Area development. However, a sensitivity analysis shows that a 10 percent TDM trip reduction within the Focus Area would not be sufficient to avoid the adverse effect on intersection operations.
The County identified an improvement that would depress the light rail transit (LRT) line under this intersection as part of the 2040 Expressway Plan. Depressing the LRT would reduce delay for both trains and vehicle traffic. The Freedom Circle Focus Area developments should provide fair-share funding towards this improvement. The funds collected for this improvement are subject to programming by the County for Board-approved projects.
2. Lawrence Expressway and Sandia Avenue/Lakehaven Drive This City of Sunnyvale intersection would operate at an unacceptable LOS F under cumulative no project conditions during the AM and PM peak hours. The buildout of the Freedom Circle Focus Area Freedom Circle Focus Area Plan and Greystar General Plan Amendment TA December 22, 2021 Page | 102
would cause the intersection’s average critical movement delay to increase by more than 4.0 seconds and the critical v/c to increase by more than 0.01 during the AM and PM peak hours. This constitutes an adverse effect on intersection operations.
As described in Chapter 4, improvements to the at-grade intersection are not feasible due to right of way constraints and impacts on adjacent properties. Implementation of TDM measures within the Freedom Circle Focus Area could reduce the vehicle trips associated with the Focus Area development. However, a sensitivity analysis shows that a 10 percent TDM trip reduction within the Focus Area would not be sufficient to avoid the adverse effect on intersection operations.
The Long-Range Transportation Plan for Santa Clara County (VTP2040) lists a project (VTP ID# R39) that would realign Wildwood Avenue to connect directly with Lawrence Expressway and create a new signalized intersection at Lawrence Expressway and Wildwood Avenue. This improvement would have a beneficial effect on traffic operations at the Lawrence/Sandia/Lakehaven intersection. The Freedom Circle Focus Area developments should provide fair-share funding towards this improvement.
5. Lawrence Expressway and E. Arques Avenue
This CMP intersection in the City of Sunnyvale would operate at an unacceptable LOS F under cumulative no project conditions during the PM peak hour. The buildout of the Freedom Circle Focus Area would cause the intersection’s average critical movement delay to increase by 17.1 seconds and the critical v/c to increase by 0.015 during the PM peak hour. This constitutes an adverse effect on intersection operations.
Implementation of TDM measures within the Freedom Circle Focus Area could reduce the vehicle trips associated with the Focus Area. However, a sensitivity analysis shows that a 10 percent TDM trip reduction within the Focus Area would not be sufficient to avoid the adverse effect on intersection operations. The County identified the need for a grade-separated interchange at this location as part of the 2040 Expressway Plan. The Freedom Circle Focus Area developments should provide fair-share funding towards this improvement. The funds collected for this improvement are subject to programming by the County for Board-approved projects.
6. Patrick Henry Drive and Tasman Drive
This City of Santa Clara intersection is expected to operate at an unacceptable LOS E under cumulative no project conditions during the AM peak hour. The buildout of the Freedom Circle Focus Area would cause the intersection’s average critical movement delay to increase by more than 4.0 seconds and the critical v/c to increase by more than 0.01 during the AM peak hour. This constitutes an adverse effect on intersection operations.
Vehicle delay at this intersection could be reduced by installing a second eastbound right-turn lane.
However, as stated previously, dual right-turn lanes are not recommended because they would adversely affect cyclists and pedestrians and conflict with City policies.
Implementation of TDM measures within the Freedom Circle Focus Area could reduce the vehicle trips associated with the Focus Area development. However, a sensitivity analysis shows that a 10 percent TDM trip reduction within the Focus Area would not be sufficient to avoid the adverse effect on intersection operations.
The adverse effect at this intersection could be lessened by the construction of a Class IV separated bikeway on Great America Parkway. This improvement, which is identified in the City’s Bicycle Master Plan Update 2018, would encourage cycling by adding a physical barrier between the existing bike lane and the vehicular travel lane, thereby increasing the comfort level for cyclists. Adjacent to the Focus Area, the bikeway improvement will be constructed as part of the Focus Area Plan. Beyond the Focus Freedom Circle Focus Area Plan and Greystar General Plan Amendment TA December 22, 2021 Page | 103
Area (between Patrick Henry Drive and SR 237), Freedom Circle area stakeholders will pay a fair share fee for future construction of the bikeway on Great America Parkway.
7. Old Ironsides Drive and Tasman Drive
This City of Santa Clara intersection would operate at an acceptable LOS D under cumulative no project conditions during the PM peak hour. The buildout of the Freedom Circle Focus Area would cause the intersection to degrade to an unacceptable LOS E during the PM peak hour. This constitutes an adverse effect on intersection operations.
Intersection operations could be improved by installing a second westbound left-turn lane and a second northbound right-turn lane. The addition of a second westbound left-turn lane is considered to be infeasible as it would require the acquisition of additional right of way on the northeast quadrant of the intersection. Furthermore, as described above, dual northbound right-turn lanes are not recommended because they would adversely affect cyclists and pedestrians and conflict with City policies.
Implementation of TDM measures within the Freedom Circle Focus Area could reduce the vehicle trips associated with the Focus Area development. However, a sensitivity analysis shows that a 10 percent TDM trip reduction within the Focus Area would not be sufficient to avoid the adverse effect on intersection operations.
The adverse effect at this intersection could be lessened by the construction of a Class IV separated bikeway on Great America Parkway. This improvement is identified in the City’s Bicycle Master Plan Update 2018. Adjacent to the Focus Area, the bikeway improvement will be constructed as part of the Focus Area Plan. Beyond the Focus Area (between Patrick Henry Drive and SR 237), Freedom Circle area stakeholders will pay a fair share fee for future construction of the bikeway on Great America Parkway.
Furthermore, the Bicycle Master Plan lists a spot improvement at this intersection that would tighten the curb radius on the northeast corner. The Freedom Circle Focus Area developments should provide fairshare funding towards these improvements.
8. Old Ironsides Drive and Old Glory Lane
This unsignalized intersection in the City of Santa Clara would operate at an unacceptable LOS F under cumulative no project conditions during the AM and PM peak hours. The poor level of service is due to the trips associated with buildout of the Patrick Henry Specific Plan and the proposed Kylli mixed-use development, which would have access via the west leg at this intersection. The buildout of the Freedom Circle Focus Area would exacerbate the deficiency at this intersection. Furthermore, the intersection is expected to satisfy the peak-hour signal warrant. This constitutes an adverse effect on intersection operations.
Intersection operations could be improved by installing a traffic signal, adding a second southbound left-turn lane, a second eastbound through lane, an exclusive northbound right-turn lane, an exclusive eastbound right-turn lane, and an exclusive westbound left-turn lane. With the recommended improvements and a 10 percent TDM reduction, the intersection would continue to operate at an unacceptable LOS E or LOS F, however the delay would be less than that under cumulative no project conditions. The Freedom Circle Focus Area developments should provide fair-share funding towards these improvements.
12. Great America Parkway and Great America Way
This City of Santa Clara intersection would operate at an acceptable LOS D during the AM peak hour and an unacceptable LOS E during the PM peak hour under cumulative no project conditions. The buildout of the Freedom Circle Focus Area would cause the intersection to degrade to an unacceptable Freedom Circle Focus Area Plan and Greystar General Plan Amendment TA December 22, 2021 Page | 104
LOS F during the AM peak hour and would cause the intersection’s average critical movement delay to increase by more than 4.0 seconds and the critical v/c to increase by more than 0.01 during the PM peak hour. This constitutes an adverse effect on intersection operations.
Implementation of TDM measures within the Freedom Circle Focus Area could reduce the vehicle trips associated with the Focus Area development. However, a sensitivity analysis shows that a 10 percent TDM trip reduction within the Focus Area would not be sufficient to avoid the adverse effect on intersection operations.
Intersection operations could be improved by adding a northbound right-turn lane. This improvement is not considered feasible as it would require acquisition of additional right-of-way. Intersection operations could be improved by the construction of a Class IV separated bikeway on Great America Parkway.
This multimodal improvement, which is identified in the City’s Bicycle Master Plan Update 2018, would encourage residents and employees to leave their vehicles at home by adding a physical barrier between the existing bike lane and the vehicular travel lane, thereby increasing the comfort level for cyclists. Adjacent to the Focus Area, the bikeway improvement will be constructed as part of the Focus Area Plan. Beyond the Focus Area (between Patrick Henry Drive and SR 237), Freedom Circle area stakeholders will pay a fair share fee for future construction of the bikeway on Great America Parkway.
16. Great America Parkway and Old Glory Lane
This City of Santa Clara intersection would operate at an unacceptable LOS F under cumulative no project conditions during the AM peak hour. The buildout of the Focus Area would cause the intersection’s average critical movement delay to increase by more than 4.0 seconds and the critical v/c to increase by more than 0.01 during the AM peak hour. This constitutes an adverse effect on intersection operations.
Intersection operations could be improved by adding a second northbound left-turn lane. With this improvement and a 10 percent TDM reduction, the intersection is expected to operate at an acceptable LOS D during the AM peak hour. During the PM peak hour, the intersection would continue to operate at LOS F, however the average delay would be less than that under cumulative no project conditions.
The Freedom Circle Focus Area developments should provide fair-share funding towards this improvement.
18. Great America Parkway and Mission College Boulevard This CMP intersection in the City of Santa Clara would operate at an unacceptable LOS F under cumulative no project conditions during the PM peak hour. The buildout of the Freedom Circle Focus Area would cause the intersection’s average critical movement delay to increase by more than 4.0 seconds and the critical v/c to increase by more than 0.01 during the PM peak hour. This constitutes an adverse effect on intersection operations.
As described above, intersection improvements are not feasible because it would require acquisition of additional right of way and negatively impact adjacent properties. Implementation of TDM measures within the Freedom Circle Focus Area could reduce the vehicle trips associated with the Focus Area development. However, a sensitivity analysis shows that a 10 percent TDM trip reduction within the Focus Area would not be sufficient to avoid the adverse effect on intersection operations.
The adverse effect at this intersection could be lessened by converting Hichborn Drive from one-way (eastbound only) flow to two-way flow with a 60-foot right-of-way width, adding a traffic signal at Great America Parkway and Hichborn Drive to allow left and right turns in and out, and synchronizing the new signal with the traffic signal at Great America Parkway and Mission College Boulevard. In addition, -the US 101 northbound off-ramp right turn to northbound Great America Parkway would be modified to Freedom Circle Focus Area Plan and Greystar General Plan Amendment TA December 22, 2021 Page | 105
reduce the curb radius to 50 feet. With the recommended improvements and a 10 percent TDM reduction, the intersection is expected to continue to operate an unacceptable LOS F during the PM peak hour. However, the critical v/c would decrease compared to cumulative no project conditions.
Thus, the recommended improvements plus TDM measures would be sufficient to fully offset the adverse effect on intersection operations. The cost of this improvement will be fully funded by Freedom Circle Focus Area developments.
23. Bowers Avenue and Central Expressway
This CMP intersection in the City of Santa Clara would operate at an unacceptable LOS F under cumulative no project conditions during the AM peak hour. The buildout of the Freedom Circle Focus Area would cause the average critical movement delay to decrease while the critical v/c would increase by more than 0.01 during the AM peak hour. This constitutes an adverse effect on intersection operations.
Implementation of TDM measures within the Freedom Circle Focus Area could reduce the vehicle trips associated with the Focus Area development. A sensitivity analysis shows that a 10 percent TDM trip reduction within the Focus Area would cause a decrease in critical v/c ratio such that the project would not be considered to have an adverse effect on intersection operations. Thus, TDM measures are expected to be sufficient to avoid the adverse effect without any physical improvements at this intersection.
27. Freedom Circle (W) and Mission College Boulevard
This City of Santa Clara intersection would operate at an acceptable LOS B and C under cumulative no project conditions during the AM and PM peak hours, respectively. The buildout of the Freedom Circle Focus Area would cause the intersection to degrade to an unacceptable LOS E during the AM peak hour and to LOS F during the PM peak hour. This constitutes an adverse effect on intersection operations.
Intersection operations could be improved by adding an eastbound right-turn lane, removing the crosswalk on the eastbound leg, relocating bus stops to the east side of the intersection, restriping the northbound approach for one right-turn lane, one shared through/left-turn lane and one left-turn lane, and implementing split-phase signal control on the north and south legs. The construction of these improvements along with the planned Class IV separated bike lanes on Mission College Boulevard would require widening Mission College Boulevard and require the dedication of additional right of way on the east side of the intersection. The dedication is required to install a far side bus stop and near side bus stop in accordance with VTA Bus Stop and Passenger Facilities Standards.
Intersection operations could be further improved by the proposed improvements at Great America Parkway and Hichborn Drive: converting Hichborn Drive from one-way (eastbound only) flow to twoway flow and adding a traffic signal at Great America Parkway and Hichborn Drive to allow left and right turns in and out. This roadway network change would provide another route out of the Freedom Circle Focus Area and thus reduce the northbound left-turn volume at the Freedom Circle W/Mission College Boulevard intersection. With the recommended improvements on the eastbound and northbound approaches, the improvements at Great America Parkway and Hichborn Drive, and a 10 percent TDM reduction, the intersection is expected to operate an acceptable LOS D during the AM and PM peak hours. Therefore, these improvements would be sufficient to avoid the adverse effect on intersection operations. The cost of these improvements will be fully funded by Freedom Circle Focus Area developments.
Freedom Circle Focus Area Plan and Greystar General Plan Amendment TA December 22, 2021 Page | 106
28. Agnew Road/Freedom Circle (E) and Mission College Boulevard This City of Santa Clara intersection would operate at an acceptable LOS D under cumulative no project conditions during the PM peak hour. The buildout of the Freedom Circle Focus Area would cause the intersection to degrade to an unacceptable LOS F during the PM peak hour. This constitutes an adverse effect on intersection operations.
Intersection operations could be improved by adding a second eastbound left-turn lane and widening the northbound approach to include one left-turn lane, one through lane, and two right-turn lanes. The addition of a second lane on the north leg (Agnew Road) to receive the dual eastbound left-turn lanes would require the dedication of right of way from adjacent properties within the Freedom Circle Focus Area and/or narrowing the sidewalk and thus is considered to be infeasible. Furthermore, as described above, dual right-turn lanes are not recommended as they would adversely affect cyclists and pedestrians and conflict with City of Santa Clara policies. Thus, only the addition of a single northbound right-turn lane is recommended. With the recommended improvement on the northbound approach and a 10 percent TDM reduction, the intersection would continue to operate at LOS E during the PM peak hour. Therefore, this improvement would not be sufficient to avoid the adverse effect on intersection operations. The cost of this improvement will be fully funded by Freedom Circle Focus Area developments.
Developments within the Freedom Circle Focus Area also will be responsible for the construction of a Class IV separated bikeway on Mission College Boulevard. This improvement, which is identified in the City’s Bicycle Master Plan Update 2018, would encourage cycling by adding a physical barrier between the existing bike lane and the vehicular travel lane, thereby increasing the comfort level for cyclists.
Within the Plan Area, the bikeway improvement will be constructed as part of the Focus Area Plan.
Beyond the Focus Area, Freedom Circle Focus Area stakeholders will pay a fair share fee for future construction of the bikeway on Mission College Boulevard between the Mission College Loop and Great America Parkway and between San Tomas Aquino Creek and Montague Expressway.
32. Mission College Boulevard and Montague Expressway
This CMP intersection in the City of Santa Clara would operate at an unacceptable LOS F under cumulative no project conditions during the AM and PM peak hours. The buildout of the Freedom Circle Focus Area would cause the intersection’s average critical movement delay to decrease while the critical v/c to increase by more the 0.010 during the AM and PM peak hours. This constitutes an adverse effect on intersection operations.
Implementation of TDM measures within the Freedom Circle Focus Area could reduce the vehicle trips associated with the Focus Area. However, a sensitivity analysis shows that even a 10 percent TDM trip reduction within the Focus Area would not be sufficient to avoid the adverse effect on intersection operations. Intersection operations could be improved by constructing a partial grade separation with a flyover from eastbound Montague Expressway to northbound Mission College Boulevard. This improvement was identified as part of the 2040 Expressway Plan. The Freedom Circle Focus Area developments should provide fair-share funding towards this improvement. The funds collected for this improvement are subject to programming by the County for Board-approved projects.
33. San Tomas Expressway and Scott Boulevard
This CMP intersection in the City of Santa Clara would operate at an unacceptable LOS F under cumulative no project conditions during the AM peak hour. The buildout of the Freedom Circle Focus Area would cause the intersection’s average critical movement delay to decrease while the critical v/c would increase by more than 0.01 during the AM peak hour. This constitutes an adverse effect on intersection operations.
Freedom Circle Focus Area Plan and Greystar General Plan Amendment TA December 22, 2021 Page | 107
Implementation of TDM measures within the Freedom Circle Focus Area could reduce the vehicle trips associated with the Focus Area. However, a sensitivity analysis shows that even a 10 percent TDM trip reduction within the Focus Area would not be sufficient to avoid the adverse effect on intersection operations. The County identified the need for a grade-separated interchange at this location as part of the Comprehensive County Expressway Planning Study 2008 Update. The Freedom Circle Focus Area developments should provide fair-share funding towards this improvement. The funds collected for this improvement are subject to programming by the County for Board-approved projects.
39. Lick Mill Boulevard and Tasman Drive
This City of Santa Clara intersection would operate at an unacceptable LOS F and E under cumulative no project conditions during the AM and PM peak hours, respectively. The buildout of the Freedom Circle Focus Area would cause the intersection’s average critical movement delay to increase by more than 4.0 seconds and the critical v/c would increase by more than 0.01 during the AM and PM peak hours. This constitutes an adverse effect on intersection operations.
Planned improvements associated with City Place that are assumed under cumulative no project conditions include reconfiguring the northbound and southbound approaches to two left-turn lanes, one through lane, and one right-turn lane. In addition, the signal phasing would be changed from split phase to protected left turns for the northbound and southbound approaches. Lastly, a second westbound leftturn lane is planned. Intersection operations could be further improved by converting the right-turn lane to a free right-turn lane. This improvement is not recommended because it would have an adverse effect on pedestrians and bicyclists. Implementation of TDM measures could reduce the vehicle trips associated with the Freedom Circle Focus Area. However, a sensitivity analysis shows that a 10 percent TDM trip reduction within the Focus Area would not be sufficient to avoid the adverse effect on intersection operations.
The adverse effect at this intersection could be lessened by the construction of a Class IV separated bikeway on Lick Mill Boulevard, which is identified in the City’s Bicycle Master Plan Update 2018. This multimodal improvement would add to the bicycle network in northern Santa Clara encouraging commuters and residents to cycle instead of traveling by motor vehicle. The Freedom Circle Focus Area developments should provide fair-share funding towards this multimodal improvement.
41. Lafayette Street and Agnew Road
This City of Santa Clara intersection would operate at an acceptable LOS D and an unacceptable LOS E under cumulative no project conditions during the AM and PM peak hours, respectively. The buildout of the Freedom Circle Focus Area would cause the intersection to degrade to an unacceptable LOS E during the AM peak hour. During the PM peak hour, the intersection would degrade to LOS F while the average critical delay would increase by more than 4.0 seconds and the critical v/c ratio would increase by more than 0.01. This constitutes an adverse effect on intersection operations.
Intersection operations under cumulative conditions could be improved by adding a southbound rightturn lane. However, the addition of a southbound right-turn lane is considered infeasible because it would require the acquisition of additional right of way. Implementation of TDM measures could reduce the vehicle trips associated with the Freedom Circle Focus Area. However, a sensitivity analysis shows that a 10 percent TDM trip reduction within the Focus Area would not be sufficient to avoid the adverse effect on intersection operations.
The adverse effect at this intersection could be lessened by the construction of a Class IV separated bikeway on Lafayette Street. This multimodal improvement, which is identified in the City’s Bicycle Master Plan Update 2018, would encourage residents and employees to bike to nearby destinations Freedom Circle Focus Area Plan and Greystar General Plan Amendment TA December 22, 2021 Page | 108
including City Place. The Freedom Circle Focus Area developments should provide fair-share funding towards this multimodal improvement.
42. Scott Boulevard and Central Expressway
This CMP intersection in the City of Santa Clara would operate at an unacceptable LOS F under cumulative no project conditions during the PM peak hour. The buildout of the Freedom Circle Focus Area would cause the intersection’s average critical movement delay to increase by more than 4.0 seconds and the critical v/c to increase by more than 0.01 during the PM peak hour. This constitutes an adverse effect on intersection operations.
Implementation of TDM measures within the Freedom Circle Focus Area could reduce the vehicles trips associated with the Focus Area. However, a sensitivity analysis shows that a 10 percent TDM trip reduction within the Focus Area would not be sufficient to avoid the adverse effect on intersection operations. The County identified the need for a grade-separated interchange at this location as part of the 2040 Expressway Plan. The Freedom Circle Focus Area developments should provide fair-share funding towards this improvement. The funds collected for this improvement are subject to programming by the County for Board-approved projects.
43. Lafayette Street and Central Expressway
This CMP intersection in the City of Santa Clara would operate at an acceptable LOS F under cumulative no project conditions during the PM peak hour. The buildout of the Freedom Circle Focus Area would cause the intersection’s average critical movement delay to decrease while the critical v/c would increase by more than 0.01. This constitutes an adverse effect on intersection operations.
Implementation of TDM measures within the Freedom Circle Focus Area could reduce the vehicles trips associated with the Focus Area development. However, a sensitivity analysis shows that a 10 percent TDM trip reduction within the Focus Area would not be sufficient to avoid the adverse effect on intersection operations. The County identified the need for a grade-separated interchange at this location as part of the 2040 Expressway Plan. The Freedom Circle Focus Area developments should provide fair-share funding towards this improvement. The funds collected for this improvement are subject to programming by the County for Board-approved projects.
44. De La Cruz Boulevard and Central Expressway
This CMP intersection in the City of Santa Clara would operate at an unacceptable LOS F under cumulative no project conditions during the AM peak hour. The buildout of the Freedom Circle would cause the intersection’s average critical movement delay to increase by more than 4.0 seconds and the critical v/c to increase by more than 0.01 during the AM peak hour. This constitutes an adverse effect on intersection operations.
The analysis of cumulative conditions at this intersection assumes the following planned improvements:
a third southbound through lane and a second southbound right-turn lane; a second eastbound rightturn lane; a third northbound left-turn lane and removal of one northbound through lane. In addition, cumulative conditions include the planned conversion of the existing HOV lanes on Central Expressway to mixed-flow lanes. Further improvements are not considered feasible since it would require extensive widening to add additional through lanes on both roadways that would entail acquisition of additional right of way adversely affecting adjacent properties as well as reconstruction of the railroad bridge over Central Expressway just west of the intersection. Implementation of TDM measures within the Freedom Circle Focus Area could reduce the vehicle trips associated with the Focus Area development.
However, a sensitivity analysis shows that a 10 percent TDM trip reduction within the Focus Area would not be sufficient to avoid the adverse effect on intersection operations.
Freedom Circle Focus Area Plan and Greystar General Plan Amendment TA December 22, 2021 Page | 109
The adverse effect at this intersection could be lessened by the construction of a Class IV separated bikeway on De La Cruz Boulevard. This improvement, which is identified in the City’s Bicycle Master Plan Update 2018, would provide an important link for cyclists between the southern and northern portions of Santa Clara and connect to buffered bike lanes on Trimble Road in San José. This intersection is also included in the City of Santa Clara Multimodal Improvement Plan (MIP). MIP Actions intended to address the LOS deficiency at this intersection include installation of crosswalk motion sensors, accessible pedestrian signals, upgraded safety lighting, travel time data collection systems, traffic monitoring cameras, and periodic retiming of signal coordination at intersections along De La Cruz Boulevard. The Freedom Circle Focus Area developments should provide fair-share funding towards these multimodal improvements.
45. Agnew Road/De La Cruz Boulevard and Montague Expressway This CMP intersection in the City of Santa Clara would operate at an unacceptable LOS F under cumulative no project conditions during the PM peak hour. The buildout of the Freedom Circle Focus Area would cause the intersection’s average critical movement delay to decrease while the critical v/c to increase by more than 0.01 during the PM peak hour. This constitutes an adverse effect on intersection operations.
Cumulative no project conditions assume the addition of a second northbound left-turn lane.
Implementation of TDM measures within the Freedom Circle Focus Area could reduce the vehicle trips associated with the Focus Area development. However, a sensitivity analysis shows that a 10 percent TDM trip reduction within the Focus Area would not be sufficient to avoid the adverse effect on intersection operations. The adverse effect at this intersection could be partially offset by the implementation of improvements listed in the City of Santa Clara Multimodal Improvement Plan (MIP).
MIP Actions intended to address the LOS deficiency at this intersection include installation of crosswalk motion sensors, accessible pedestrian signals, upgraded safety lighting, travel time data collection systems, traffic monitoring cameras, and periodic retiming of signal coordination at intersections along Agnew Road and De La Cruz Boulevard. The Freedom Circle Focus Area developments should provide fair-share funding towards these multimodal improvements.
46. Lick Mill Boulevard and Montague Expressway
This City of Santa Clara intersection would operate at an unacceptable LOS F under cumulative no project conditions during the PM peak hour. The buildout of the Freedom Circle Focus Area would cause the intersection’s average critical delay to increase by more than 4.0 seconds and the critical v/c ratio to increase by more than 0.01 during the PM peak hour. This constitutes an adverse effect on intersection operations.
Cumulative no project conditions assume the addition of a third southbound left-turn lane.
Implementation of TDM measures within the Freedom Circle Focus Area could reduce the vehicle trips associated with the Focus Area development. However, a sensitivity analysis shows that a 10 percent TDM trip reduction within the Focus Area would not be sufficient to avoid the adverse effect on intersection operations.
The adverse effect at this intersection could be lessened by the construction of a Class IV separated bikeway on Lick Mill Boulevard, which is identified in the City’s Bicycle Master Plan Update 2018. This multimodal improvement would add to the bicycle network in northern Santa Clara encouraging commuters and residents to cycle instead of traveling by motor vehicle. The Freedom Circle Focus Area developments should provide fair-share funding towards this multimodal improvement.
Freedom Circle Focus Area Plan and Greystar General Plan Amendment TA December 22, 2021 Page | 110
47. N. 1st Street and Montague Expressway
This CMP intersection in the City of San José would operate at an unacceptable LOS F under cumulative no project conditions during the AM and PM peak hours. The buildout of the Freedom Circle Focus Area would cause the intersection’s average critical movement delay to increase by more than
4.0 seconds and the critical v/c to increase by more than 0.01 during the AM peak hour. During the PM peak hour, the buildout of the Freedom Circle Focus Area would cause the intersection’s average critical movement delay to decrease while the critical v/c would increase by more than 0.01. This constitutes an adverse effect on intersection operations.
Implementation of TDM measures could reduce the vehicle trips associated with the Freedom Circle Focus Area. However, a sensitivity analysis shows that a 10 percent TDM trip reduction within Focus Area would not be sufficient to avoid the adverse effect on intersection operations. The County identified the need for a grade-separated interchange at this location as part of the 2040 Expressway Plan. The Freedom Circle Focus Area developments should provide fair-share funding towards this improvement. The funds collected for this improvement are subject to programming by the County for Board-approved projects.
52. Lawrence Expressway and Reed Avenue/Monroe Street
This CMP intersection in the City of Sunnyvale would operate at an unacceptable LOS F under cumulative no project conditions during the AM peak hour. The buildout of the Freedom Circle Focus Area would cause the intersection’s average critical movement delay to increase by more than 4.0 seconds and the critical v/c to increase by more than 0.01 during the AM peak hour. During the PM peak hour, the buildout of the Freedom Circle Focus Area would cause the intersection’s average critical movement delay to decrease while the critical v/c would increase by more than 0.01. This constitutes an adverse effect on intersection operations.
Implementation of TDM measures could reduce the vehicle trips associated with the Freedom Circle Focus Area. However, a sensitivity analysis shows that a 10 percent TDM trip reduction within Focus Area would not be sufficient to avoid the adverse effect on intersection operations. The County identified the need for a grade-separated interchange at this location as part of the 2040 Expressway Plan. The Freedom Circle Focus Area developments should provide fair-share funding towards this improvement. The funds collected for this improvement are subject to programming by the County for Board-approved projects.
54. Lawrence Expressway and Pruneridge Avenue
This City of Santa Clara intersection would operate at an unacceptable LOS F under cumulative no project conditions during the AM peak hour. The buildout of the Freedom Circle Focus Area would cause the intersection’s average critical movement delay to increase by more than 4.0 seconds and the critical v/c to increase by more than 0.01 during the AM peak hour. This constitutes an adverse effect on intersection operations.
Implementation of TDM measures could reduce the vehicle trips associated with the Freedom Circle Focus Area. However, a sensitivity analysis shows that a 10 percent TDM trip reduction within Focus Area would not be sufficient to avoid the adverse effect on intersection operations. The County identified the need for a grade-separated interchange at this location as part of the 2040 Expressway Plan. The Freedom Circle Focus Area developments should provide fair-share funding towards this improvement. The funds collected for this improvement are subject to programming by the County for Board approved improvement projects.
Freedom Circle Focus Area Plan and Greystar General Plan Amendment TA December 22, 2021 Page | 111
57. Kiely Boulevard and Benton Street
This City of Santa Clara intersection would operate at an unacceptable LOS E under cumulative no project conditions during the PM peak hour. The buildout of the Freedom Circle Focus Area would cause the intersection’s average critical movement delay to increase by more than 4.0 seconds and the critical v/c to increase by more than 0.01 during the PM peak hour. This constitutes an adverse effect on intersection operations.
Implementation of TDM measures could reduce the vehicle trips associated with the Freedom Circle Focus Area. However, a sensitivity analysis shows that a 10 percent TDM trip reduction within Focus Area would not be sufficient to avoid the adverse effect on intersection operations. The adverse effect at this intersection could be lessened by the construction of Class IIB buffered bike lanes on Benton Street, which is identified in the City’s Bicycle Master Plan Update 2018. Furthermore, the Pedestrian Master Plan 2019 recommends the construction of curb extensions as a spot improvement at this intersection. These multimodal improvements would encourage active transportation modes as an alternative to traveling by motor vehicle. The Freedom Circle Focus Area developments should provide fair-share funding towards these improvements.
58. Kiely Boulevard and Homestead Road
This City of Santa Clara intersection would operate at an unacceptable LOS E under cumulative no project conditions during the PM peak hour. The buildout of the Freedom Circle Focus Area would cause the intersection to degrade to LOS F while the intersection’s average critical movement delay would increase by more than 4.0 seconds and the critical v/c would increase by more than 0.01 during the PM peak hour. This constitutes an adverse effect on intersection operations.
Intersection operations could be improved by adding an eastbound right-turn lane. However, this would require eliminating on-street parking, which would negatively affect adjacent properties. Thus, this improvement is not recommended. Implementation of TDM measures could reduce the vehicle trips associated with the Freedom Circle Focus Area. However, a sensitivity analysis shows that a 10 percent TDM trip reduction within Focus Area would not be sufficient to avoid the adverse effect on intersection operations.
The adverse effect at this intersection could be reduced by construction of Class IIB buffered bike lanes on Bowers Avenue from Chromite Drive to El Camino Real. This upgrade from the existing Class III bike route would increase the comfort level of cyclists along this key route through central Santa Clara.
Furthermore, the Pedestrian Master Plan 2019 identifies spot improvements at this intersection including reducing the curb radius, adding curb ramps, constructing transit waiting area improvements and public space activation/parklet. The Freedom Circle Focus Area developments should provide fairshare funding towards these multimodal improvements.
Summary of Cumulative Plus Project Conditions
A summary of the adverse effects associated with the Greystar General Plan Amendment and with buildout of the Freedom Circle Focus Area under cumulative conditions, the recommended improvements, and funding responsibilities are provided in Tables 16 and 17, respectively.
Freedom Circle Focus Area Plan and Greystar General Plan Amendment TA December 22, 2021 Page | 112
Table 16 Summary of Affected Intersections under Cumulative Plus Project Conditions - Greystar Project
# Intersection Jurisdiction Recommended Improvements Responsibility7 Old Ironsides Drive and Tasman Drive SC TDM Measures with 10% Trip Reduction 100%8 Old Ironsides Drive and Old Glory Lane SC % of Total Traffic (Unsignalized)
17 Great America Parkway and Patrick Henry Drive SC Add a second northbound left-turn lane % of Total Traffic18 Great America Pkwy and Mission College Blvd SC % of Total Traffic (CMP)
27 Freedom Circle W and Mission College Blvd SC % of Total Traffic28 Agnew/Freedom Circle E & Mission College Blvd SC % of Total Traffic 32 Mission College Blvd and Montague Expwy SCC Construct partial grade separation % of Total Traffic (CMP) (2040 Expressway Plan)
Notes:
SCC = Santa Clara County, SC = Santa Clara, SJ = San Jose, SV = Sunnyvale Install a traffic signal and add a 2nd SB LT lane, a 2nd EB TH lane, a NB RT lane, an EB RT lane, and a WB LT lane Add an eastbound right-turn lane; Remove west leg crosswalk; Relocate bus stops to the east side of the intersection; Restripe south leg with 1 left-turn, 1 left-turn/through, 1 right-turn lane; Make north leg and south leg split phase; Convert Hichborn Dr. to 2-way flow and add a signal at Great America Parkway.Add a northbound right-turn lane. Convert Hichborn Drive from one-way (eastbound only) flow to twoway flow with a 60-feet right-of-way width, add a traffic signal at Great America Parkway and Hichborn Drive to allow left and right turns in and out, synchronize the new signal with the traffic signal at Great America Parkway and Mission College Boulevard, reduce the curb radius at the US 101 northbound off-ramp right turn to northbound Great America Parkway to 50 feet.
Freedom Circle Focus Area Plan and Greystar General Plan Amendment TA December 22, 2021 Page | 113
Table 17 Summary of Affected Intersections under Cumulative Plus Project Conditions – Focus Area Buildout Project
# Intersection Jurisdiction Recommended Improvements Responsibility1 Lawrence Expressway and Tasman Drive SCC Depress LRT under the intersection % of Total Traffic (CMP) (2040 Expressway Plan)
2 Lawrence Expwy and Sandia Av/Lakehaven Dr SCC % of Total Traffic5 Lawrence Expressway and E. Arques Ave. SCC % of Total Traffic (CMP)
6 Patrick Henry Drive and Tasman Drive SC Construct Class IV bikeway on Great America Parkway adjacent Plan 100% Construct Class IV bikeway on Great America Parkway between SR 237 and Patrick Henry Drive (Bicycle Master Plan Update 2018) % of Total Traffic
7 Old Ironsides Drive and Tasman Drive SC Construct Class IV bikeway on Great America Parkway adjacent Plan area Construct Class IV bikeway on Great America Parkway between SR 237 and Patrick Henry Drive (Bicycle Master Plan Update 2018) and 100%
% of Total Traffic
tighten curb radius on NE corner (Bicycle Master Plan Update 2018) % of Total Traffic 8 Old Ironsides Drive and Old Glory Lane SC % of Total Traffic (Unsignalized)
12 Great America Parkway and Great America Way SC Construct Class IV bikeway on Great America Parkway adjacent Plan 100% Construct Class IV bikeway on Great America Parkway between SR 237 and Patrick Henry Drive (Bicycle Master Plan Update 2018) % of Total Traffic
16 Great America Parkway and Old Glory Lane SC % of Total Traffic18 Great America Pkwy and Mission College Blvd (CMP)
SC 100%
23 Bowers Avenue and Central Expressway SCC TDM Measures with 10% Trip Reduction 100% (CMP)
27 Freedom Circle W and Mission College Blvd SC 100%28 Agnew/Freedom Circle E & Mission College Blvd SC Same improvement as proposed under background conditions and Construct Class IV bikeway on Mission College Boulevard within the Plan Area (Bicycle Master Plan Update 2018) 100%
Construct Class IV bikeway on Mission College Boulevard between the Mission College Loop and Great America Parkway and between San Tomas Aquino Creek and Montague Expressway. % of Total Traffic
Same improvements as proposed under background conditionsSame improvements as proposed under background conditionsAdd a second northbound left-turn laneSame improvements as proposed under background conditionsInstall a traffic signal and add a 2nd SB LT lane, a 2nd EB TH lane, a NB RT lane, an EB RT lane, and a WB LT lane Same improvements as proposed under background conditions Freedom Circle Focus Area Plan and Greystar General Plan Amendment TA December 22, 2021 Page | 114
Table 17 (continued) Summary of Affected Intersections under Cumulative Plus Project Conditions – Focus Area Buildout Project
# Intersection Jurisdiction Recommended Improvements Responsibility 32 Mission College Blvd and Montague Expwy SCC Same improvements as proposed under background conditions (CMP)
33 San Tomas Expressway and Scott Boulevard SCC Construct grade separated interchange (CMP) (Comprehensive County Expressway Planning Study 2008 Update) 39 Lick Mill Boulevard and Tasman Drive SC Construct a Class IV separated bikeway on Lick Mill Boulevard % of Total Traffic (Bicycle Master Plan Update 2018)
41 Lafayette Street and Agnew Road SC Construct a Class IV separated bikeway on Lafayette Street % ot Total Traffic (Bicycle Master Plan Update 2018)
42 Scott Boulevard and Central Expressway SCC
(CMP)
43 Lafayette Street and Central Expressway SCC Same improvements as proposed under background conditions (CMP)
44 De la Cruz Boulevard and Central Expressway SCC % of Total Traffic (CMP)
45 Agnew Rd/De La Cruz Blvd and Montague Expwy SCC
(CMP)
46 Lick Mill Boulevard and Montague Expressway SCC % of Total Traffic 47 N. 1st Street and Montague Expressway SCC
(CMP)
52 Lawrence Expressway and Reed Ave/Monroe St SCC Construct grade separated interchange % of Total Traffic (CMP) (2040 Expressway Plan)
% of Total Traffic
Same improvements as proposed under background conditionsConstruct Class IV separated bikeway on De La Cruz Boulevard (Bicycle Master Plan Update 2018) and implement measures identified in Multimodal Improvement PlanSame improvements as proposed under background conditionsSame improvements as proposed under background conditionsConstruct Class IV separated bikeway on Lick Mill Boulevard (Bicycle Master Plan Update 2018) Freedom Circle Focus Area Plan and Greystar General Plan Amendment TA December 22, 2021 Page | 115
Table 17 (continued) Summary of Affected Intersections under Cumulative Plus Project Conditions – Focus Area Buildout Project
# Intersection Jurisdiction Recommended Improvements Responsibility 54 Lawrence Expressway and Pruneridge Avenue SCC57 Kiely Boulevard and Benton Street SC % of Total Traffic58 Kiely Boulevard and Homestead Road SC % of Total Traffic Notes:
SCC = Santa Clara County, SC = Santa Clara, SJ = San Jose, SV = Sunnyvale Same improvements as proposed under background conditionsConstruct Class IIB buffered bike lanes on Bowers Avenue between Chromite Drive and El Camino Real (Bicycle Master Plan Update 2018) and spot improvements including reducing the curb radius, adding curb ramps, transit waiting area improvements and public space activation/parklet (Pedestrian Master Plan 2019)Construct Class IIB buffered bike lanes on Benton Street (Bicycle Master Plan Update 2018) and spot improvements including curb extensions (Pedestrian Master Plan 2019) Freedom Circle Focus Area Plan and Greystar General Plan Amendment TA December 22, 2021 Page | 116
6. Other Transportation Issues
This chapter presents other transportation issues associated with the project, including:
x Freeway segment traffic operations
x Freeway ramp traffic operations
x Vehicle queuing analysis
x Signal warrant analysis at unsignalized study intersections x Site access and internal vehicular circulation within the Freedom Circle Focus Area x Parking analysis
x Impacts on pedestrians, bicycles, and transit facilities Unlike the level of service analysis, which is based on level of service standards adopted by the Cities of Santa Clara, Sunnyvale, and San José and the Valley Transportation Authority, many topics contained in this chapter are based on professional judgment in accordance with the standards and methods employed by the traffic engineering community. Although intersection level of service deficiencies identified in the previous chapters and operational issues described in this chapter are not considered CEQA impacts, they do describe traffic conditions that are relevant to describing the transportation environment with the proposed Freedom Circle Focus Area. In contrast, impacts on pedestrians, bicycle, and transit facilities were evaluated according to the CEQA checklist.
Freeway Segment Traffic Operations
Traffic volumes for the study freeway segments in Santa Clara County were obtained from the 2018 CMP Annual Monitoring Report. The existing levels of service for study freeway segments in San Mateo and Alameda Counties were obtained from the 2018 and 2019 CMP Monitoring Program Reports, respectively. The results show that the mixed-flow lanes and/or HOV lane(s) on the following study freeway segments currently operate at LOS F in at least one direction during at least one peak hour:
x US 101, northbound between Bernal Road and Silver Creek Valley Road (AM peak hour) x US 101, northbound between Silver Creek Valley Road and Hellyer Avenue (AM peak hour) x US 101, northbound between Hellyer Avenue and Yerba Buena Road (AM peak hour) x US 101, northbound between Yerba Buena Road to Capitol Expressway (AM peak hour) x US 101, northbound between Capitol Expressway to Tully Road (AM peak hour) x US 101, northbound between Tully Road to Story Road (AM peak hour) x US 101, northbound between Story Road to I-280 (AM peak hour) x US 101, northbound between I-280 to Santa Clara Street (AM peak hour) Freedom Circle Focus Area Plan and Greystar General Plan Amendment TA December 22, 2021 Page | 117
x US 101, northbound between Santa Clara Street to McKee Road (AM peak hour) x US 101, northbound between McKee Road and Oakland Road (AM Peak Hour) x US 101, northbound between Oakland Road and I-880 (AM Peak Hour) x US 101, northbound between I-880 and Old Bayshore Highway (AM Peak Hour) x US 101, northbound between Old Bayshore Highway and N. First Street (AM Peak Hour) x US 101, northbound between N. First Street and Guadalupe Parkway (AM Peak Hour) x US 101, northbound between Guadalupe Parkway and De La Cruz Boulevard (AM Peak Hour) x US 101, northbound between De La Cruz Boulevard and Montague Expressway/San Tomas Expressway (AM Peak Hour)
x US 101, northbound between Montague Expressway/San Tomas Expressway and Bowers Avenue/Great America Parkway (AM Peak Hour)
x US 101, northbound between Bowers Avenue/Great America Parkway and Lawrence Expressway (AM Peak Hour)
x US 101, northbound between Lawrence Expressway and N. Fair Oaks Avenue (AM Peak Hour) x US 101, northbound between N. Fair Oaks Avenue and N. Mathilda Avenue (AM Peak Hour) x US 101, northbound between N. Mathilda Avenue and SR 237 (AM Peak Hour) x US 101, northbound between SR 237 and Moffett Boulevard (AM Peak Hour) x US 101, northbound between Moffett Boulevard and SR 85 (Both Peak Hours) x US 101, northbound between SR 85 and to N. Shoreline Boulevard (Both Peak Hours) x US 101, northbound between N. Shoreline Boulevard and Rengstorff Avenue (Both Peak Hours)
x US 101, northbound between Rengstorff Avenue and San Antonio Avenue (PM Peak Hour) x US 101, northbound between San Antonio Avenue and Oregon Expressway (PM Peak Hour) x US 101, northbound between Oregon Expressway and Embarcadero Road (Both Peak Hours) x US 101, northbound between Santa Clara County Line and Whipple Avenue (Both Peak Hours) x US 101, northbound between Whipple Avenue and SR 92 (Both Peak Hours) x US 101, southbound between SR 92 and Whipple Avenue (Both Peak Hours) x US 101, southbound between Whipple Avenue and Santa Clara County Line (Both Peak Hours) x US 101, southbound between Embarcadero Road and Oregon Expressway (PM Peak Hour) x US 101, southbound between Oregon Expressway and San Antonio Avenue (PM Peak Hour) x US 101, southbound between San Antonio Avenue and Rengstorff Avenue (PM Peak Hour) x US 101, southbound between Rengstorff Avenue and N. Shoreline Boulevard (PM Peak Hour) x US 101, southbound between N. Shoreline Boulevard and SR 85 (PM Peak Hour) x US 101, southbound between SR 85 and Moffett Boulevard (PM Peak Hour) x US 101, southbound between Moffett Boulevard and SR 237 (PM Peak Hour) x US 101, southbound between SR 237 and N. Mathilda Avenue (PM Peak Hour) x US 101, southbound between N. Mathilda Avenue and N. Fair Oaks Avenue (PM Peak Hour) x US 101, southbound between N. Fair Oaks Avenue and Lawrence Expressway (PM Peak Hour) x US 101, southbound between Lawrence Expressway and Bowers Avenue/Great America Parkway (PM Peak Hour)
x US 101, southbound between Bowers Avenue/Great America Parkway and Montague Expressway/San Tomas Expressway (PM Peak Hour)
x US 101, southbound between Montague Expressway/San Tomas Expressway and De La Cruz Boulevard (PM Peak Hour)
x US 101, southbound between Guadalupe Parkway and N. First Street (PM Peak Hour) x US 101, southbound between N. First Street and Old Bayshore Highway (PM Peak Hour) x US 101, southbound between Old Bayshore Highway and I-880 (PM Peak Hour) x US 101, southbound between I-880 and Oakland Road (PM Peak Hour) x SR 237, eastbound between SR 85 and Central Parkway (AM Peak Hour) Freedom Circle Focus Area Plan and Greystar General Plan Amendment TA December 22, 2021 Page | 118
x SR 237, eastbound between Maude Avenue and US 101 (PM Peak Hour) x SR 237, eastbound between US 101 and Mathilda Avenue (PM Peak Hour) x SR 237, eastbound between Mathilda Avenue and N. Fair Oaks Avenue (PM Peak Hour) x SR 237, eastbound between N. Fair Oaks Avenue and Lawrence Expressway (PM Peak Hour) x SR 237, eastbound between Lawrence Expressway and Great America (PM Peak Hour) x SR 237, eastbound between Great America Parkway and N. First Street (PM Peak Hour) x SR 237, eastbound between N. First Street and Zanker Road (PM Peak Hour) x SR 237, westbound between I-880 and McCarthy Boulevard (AM Peak Hour) x SR 237, westbound between McCarthy Boulevard and Zanker Road (AM Peak Hour) x SR 237, westbound between Zanker Road and N. First Street (AM Peak Hour) x SR 237, westbound between N. First Street and Great America Parkway (AM Peak Hour) x SR 237, westbound between Great America Parkway and Lawrence Expressway (AM Peak Hour)
x SR 237, westbound between Lawrence Expressway and N. Fair Oaks Avenue (Both Peak Hours)
x SR 237, westbound between N. Fair Oaks Avenue and Mathilda Avenue (Both Peak Hours) x SR 237, westbound between Mathilda Avenue and US 101 (PM Peak Hour) x SR 237, westbound between US 101 and Maude Avenue (PM Peak Hour) x SR 237, westbound between Maude Avenue and Central Parkway (PM Peak Hour) x SR 237, westbound between Central Parkway and SR 85 (PM Peak Hour) x SR 237, westbound between SR 85 and to El Camino Real (AM Peak Hour) x SR 87, northbound between SR 85 and Capitol Expressway (AM Peak Hour) x SR 87, northbound between Capitol Expressway and Curtner Avenue (AM Peak Hour) x SR 87, northbound between Curtner Avenue and Almaden Road (AM Peak Hour) x SR 87, northbound between I-280 and Julian Street (AM Peak Hour) x SR 87, northbound between Julian Street and Coleman Avenue (AM Peak Hour) x SR 87, northbound between Taylor Street and Skyport Drive (AM Peak Hour) x SR 87, northbound between Skyport Drive and US 101 (AM Peak Hour) x SR 87, southbound between US 101 and Skyport Drive (PM Peak Hour) x SR 87, southbound between Skyport Drive and Taylor Street (PM Peak Hour) x SR 87, southbound between Taylor Street and Coleman Street (PM Peak Hour) x SR 87, southbound between Julian Street and I-280 (PM Peak Hour) x SR 87, southbound between I-280 and Alma Avenue (PM Peak Hour) x SR 87, southbound between Alma Avenue and Almaden Avenue (PM Peak Hour) x I-680, northbound between Scott Creek Road and SR 262 (PM Peak Hour) x I-680, northbound between SR 262 and Durham Road (PM Peak Hour) x I-680, northbound between Durham Road and Washington Boulevard (PM Peak Hour) x I-680, northbound between Washington Boulevard and SR 238 (PM Peak Hour) x I-680, northbound between SR 238 and Vargas Road (PM Peak Hour) x I-680, northbound between Vargas Road and Andrade Road (PM Peak Hour) x I-680, southbound between Bernal Avenue and Sunol Boulevard (AM Peak Hour) x I-680, southbound between Stoneridge Drive and Bernal Avenue (AM Peak Hour) x I-680, southbound between Jacklin Road and Calaveras Boulevard/SR 237 (PM Peak Hour) x I-680, southbound between Calaveras Boulevard/SR 237 and Yosemite Drive (PM Peak Hour) x I-880, northbound between Dixon Landing Road to SR 262 (PM Peak Hour) x I-880, northbound between Stevenson Boulevard and Decoto Road (PM Peak Hour) x I-880, northbound between Decoto Road and Alvarado Boulevard (PM Peak Hour) x I-880, southbound between Decoto Road and Stevenson Boulevard (AM Peak Hour) Freedom Circle Focus Area Plan and Greystar General Plan Amendment TA December 22, 2021 Page | 119
x I-880, southbound between Alvarado Boulevard and Decoto Boulevard (AM Peak Hour) x I-880, southbound between Great Mall Parkway and Montague Expressway (Both Peak Hours) x I-880, southbound between SR 237 and Great Mall Parkway (PM Peak Hour) x I-880, southbound between Dixon Landing and SR 237 (AM Peak Hour) Per the CMP guidelines, the analysis of freeway segments with buildout of the Freedom Circle Focus Area was evaluated under existing (2018/2019) plus project conditions. As described previously, trips associated with buildout of the Freedom Circle Focus Area in the Year 2018 were estimated using ITE trip rates, a 25-percent pass-by trip reduction, and reductions for internalization and transit usage based on CSC model estimates. The gross project trips remain the same as described in Chapter 4.
After applying reductions for internal capture, transit use, and pass-by trips, the Freedom Circle Focus Area development is expected to generate 70,075 net daily vehicle trips, 7,132 (5,399 inbound and 1,733 outbound) net AM peak hour trips, and 7,427 (1,903 inbound and 5,524 outbound) net PM peak hour trips under existing conditions (See Table 18).
Table 18
Freedom Circle Focus Area Trip Generation Estimates (Year 2018) Freedom Circle Focus Area Plan and Greystar General Plan Amendment TA December 22, 2021 Page | 120
The freeway analysis results (see Tables 19, 20, and 21) reflect the net increase in freeway trips above that generated by the existing Focus Area uses. Due to the existing freeway congestion in the vicinity of the Freedom Circle Focus Area, the model shows that freeway traffic volumes would increase very little under existing plus project conditions compared to existing conditions. To ensure that the transportation analysis does not under report potential adverse effects on freeway segments, the freeway analysis was conducted based on the difference in the CSC model project trip assignment on each freeway segment for the proposed uses compared to the existing uses. Thus, the freeway analysis reflects the net increase in trips generated by buildout of the Focus Area without any subtraction for existing traffic that would divert to other roadways due to the project. At the same time, the model forecasts on local roadways presented in previous chapters include traffic that is expected to divert from the freeway due to the addition of project-generated traffic. Thus, the transportation analysis reflects a conservative, worst-case evaluation of the project’s effects on both freeways and local streets.
The mixed-flow lanes on the following freeway segments would be adversely affected under existing plus project conditions due to the buildout of the Freedom Circle Focus Area:
x US 101, northbound between Santa Clara County Line and Whipple Avenue (PM Peak Hour) x US 101, northbound between Whipple Avenue and SR 92 (PM Peak Hour) x US 101, northbound between Bernal Road and Silver Creek Valley Road (AM peak hour) x US 101, northbound between Silver Creek Valley Road and Hellyer Avenue (AM peak hour) x US 101, northbound between Hellyer Avenue and Yerba Buena Road (AM peak hour) x US 101, northbound between Yerba Buena Road to Capitol Expressway (AM peak hour) x US 101, northbound between Capitol Expressway to Tully Road (AM peak hour) x US 101, northbound between Tully Road to Story Road (AM peak hour) x US 101, northbound between Story Road to I-280 (AM peak hour) x US 101, northbound between I-280 to Santa Clara Street (AM peak hour) x US 101, northbound between Santa Clara Street to McKee Road (AM peak hour) x US 101, northbound between McKee Road and Oakland Road (AM Peak Hour) x US 101, northbound between Oakland Road and I-880 (AM Peak Hour) x US 101, northbound between I-880 and Old Bayshore Highway (AM Peak Hour) x US 101, northbound between Old Bayshore Highway and N. First Street (AM Peak Hour) x US 101, northbound between N. First Street and Guadalupe Parkway (AM Peak Hour) x US 101, northbound between Guadalupe Parkway and De La Cruz Boulevard (AM Peak Hour) x US 101, northbound between De La Cruz Boulevard and Montague Expressway/San Tomas Expressway (AM Peak Hour)
x US 101, northbound between Montague Expressway/San Tomas Expressway and Bowers Avenue/Great America Parkway (AM Peak Hour)
x US 101, northbound between Bowers Avenue/Great America Parkway and Lawrence Expressway (AM Peak Hour)
x US 101, northbound between Lawrence Expressway and N. Fair Oaks Avenue (AM Peak Hour) x US 101, northbound between N. Fair Oaks Avenue and N. Mathilda Avenue (AM Peak Hour) x US 101, northbound between SR 237 and Moffett Boulevard (AM Peak Hour) x US 101, northbound between Moffett Boulevard and SR 85 (AM and PM Peak Hours) x US 101, northbound between SR 85 and N. Shoreline Boulevard (AM and PM Peak Hour) x US 101, northbound between N. Shoreline Boulevard and Rengstorff Avenue (PM Peak Hour) x US 101, northbound between Rengstorff Avenue and San Antonio Avenue (PM Peak Hour) x US 101, northbound between San Antonio Avenue and Oregon Expressway (PM Peak Hour) x US 101, northbound between Oregon Expressway and Embarcadero Road (PM Peak Hour) x US 101, southbound between SR 92 and Whipple Avenue (AM Peak Hour) x US 101, southbound between Whipple Avenue and Santa Clara County Line (AM Peak Hour) Freedom Circle Focus Area Plan and Greystar General Plan Amendment TA December 22, 2021 Page | 121
x US 101, southbound between N. Shoreline Boulevard and SR 85 (PM Peak Hour) x US 101, southbound between SR 85 and Moffett Boulevard (PM Peak Hour) x US 101, southbound between Moffett Boulevard and SR 237 (PM Peak Hour) x US 101, southbound between SR 237 and N. Mathilda Avenue (PM Peak Hour) x US 101, southbound between N. Mathilda Avenue and N. Fair Oaks Avenue (PM Peak Hour) x US 101, southbound between N. Fair Oaks Avenue and Lawrence Expressway (PM Peak Hour) x US 101, southbound between Lawrence Expressway and Bowers Avenue / Great American Parkway (PM Peak Hour)
x US 101, southbound between Bowers Avenue / Great American Parkway and Montague Expressway / San Tomas Expressway (PM Peak Hour)
x US 101, southbound between Montague Expressway / San Tomas Expressway and De La Cruz Boulevard (PM Peak Hour)
x US 101, southbound between Guadalupe Parkway and N. First Street (PM Peak Hour) x US 101, southbound between N. First Street and Old Bayshore Highway (PM Peak Hour) x US 101, southbound between Old Bayshore Highway and I-880 (PM Peak Hour) x US 101, southbound between I-880 and Oakland Road (PM Peak Hour) x US 101, southbound between Oakland Road and McKee Road (PM Peak Hour) x SR 237, eastbound between SR 85 and Central Expressway (AM Peak Hour) x SR 237, eastbound between Maude Avenue and US 101 (PM Peak Hour) x SR 237, eastbound between Great America Parkway and N. First Street (PM Peak Hour) x SR 237, eastbound between N. First Street and Zanker Road (PM Peak Hour) x SR 237, westbound between I-880 and McCarthy Boulevard (AM Peak Hour) x SR 237, westbound between McCarthy Boulevard and Zanker Road (AM Peak Hour) x SR 237, westbound between Zanker Road and N. 1st Street (AM Peak Hour) x SR 237, westbound between N. 1st Street and Great America Parkway (AM Peak Hour) x SR 237, westbound between US 101 and Maude Avenue (PM Peak Hour) x SR 237, westbound between Maude Avenue and Central Parkway (PM Peak Hour) x SR 237, westbound between Central Parkway and SR 85 (PM Peak Hour) x SR 237, westbound between SR 85 and El Camino Real (AM Peak Hour) x SR 87, northbound between SR 85 and Capitol Expressway (AM Peak Hour) x SR 87, northbound between Capitol Expressway and Curtner Avenue (AM Peak Hour) x SR 87, northbound between Curtner Avenue and Almaden Road (AM Peak Hour) x SR 87, northbound between Almaden Road and Alma Avenue (AM Peak Hour) x SR 87, northbound between I-280 and Julian Street (AM Peak Hour) x SR 87, northbound between Julian Street and Coleman Avenue (AM Peak Hour) x SR 87, northbound between Taylor Street and Skyport Drive (AM Peak Hour) x SR 87, northbound between Skyport Drive and US 101 (AM Peak Hour) x SR 87, southbound between US 101 and Skyport Drive (PM Peak Hour) x SR 87, southbound between Skyport Drive and Taylor Street (PM Peak Hour) x SR 87, southbound between Taylor Street and Coleman Street (PM Peak Hour) x SR 87, southbound between Julian Street and I-280 (PM Peak Hour) x SR 87, southbound between I-280 and Alma Avenue (PM Peak Hour) x SR 87, southbound between Alma Avenue and Almaden Avenue (PM Peak Hour) x I-880, southbound between Great Mall Parkway and Montague Expressway (AM Peak Hour) x I-880, southbound between Dixon Landing and SR 237 (AM Peak Hour) x I 680, northbound between Scott Creek Road and SR 262 (PM Peak Hour) x I 680, northbound between SR 262 and Durham Road (PM Peak Hour) x I 680, northbound between Durham Road and Washington Boulevard (PM Peak Hour) Freedom Circle Focus Area Plan and Greystar General Plan Amendment TA December 22, 2021 Page | 122
x I 680, northbound between Washington Boulevard and SR 238 (PM Peak Hour) x I 680, northbound between SR 238 and Vargas Road (PM Peak Hour) x I 680, northbound between Vargas Road and Andrade Road (PM Peak Hour) x I 680, southbound between Bernal Avenue and Sunol Boulevard (AM Peak Hour) x I 680, southbound between Stoneridge Drive and Bernal Avenue (AM Peak Hour) x I-880, northbound between Dixon Landing and SR 262 (PM Peak Hour) Furthermore, the buildout of the Freedom Circle Focus Area also would adversely affect 42 high occupancy vehicle (HOV) lane segments.
The VTA’s Valley Transportation Plan (VTP) 2040 identifies freeway express lane projects along US 101 between Cochrane Road and Whipple Avenue. The planned conversion of the existing HOV lane to an express lane and the construction of a second express lane in each direction would increase the capacity of the freeway and help to address the deficiency in freeway operations to which the project would contribute. The Phase 3 portion of the Silicon Valley Express Lanes Project, which extends along US 101 from SR 237 to San Mateo County, is currently under construction and is anticipated to open in 2021. Phase 5, which will extend the US 101 express lanes south from SR 237 to I-880, is expected to be completed in 2025. The San Mateo 101 Express Lanes Project is currently under construction and is expected to be completed in 2022.
The Phase 2 portion of the Silicon Valley Express Lane Project, which extends along SR 237 from N.
First Street to Mathilda Avenue, opened in November 2019. The level of service listed in the above table are taken from VTA's 2018 Congestion Management Program Monitoring Report, and thus do not reflect the newly opened express lane. Additional freeway improvements such as the addition of mixedflow lanes are generally not feasible due to right of way constraints and secondary impacts associated with induced travel.
The Alameda County Transportation Commission (Alameda CTC), in cooperation with the California Department of Transportation (Caltrans) and the Federal Highway Administration (FHWA), environmentally cleared the construction of an HOV/express lane on northbound I-680 from the SR 237 interchange in Santa Clara County to north of the SR 84 interchange in Alameda County. The project was split into two phases. Phase 1, which entailed the construction of nine miles of a HOV/continuous access express lane in the northbound direction on I-680 between SR 262 and SR 84 was completed in 2020. Additionally, the adjacent I-680 Southbound Express Lane is being upgraded to improve access.
Tolling operations for both directions will begin in spring 2022. Phase 2 will construct five miles of HOV/express lane along the northbound direction on I-680 from SR-237 to Auto Mall Parkway through widening I-680 along with other necessary improvements, including structure widening/modification and retaining walls. Future development of Phase 2 will be performed in close coordination with the Santa Clara Valley Transportation Authority.
The Metropolitan Transportation Commission (MTC) completed the conversion of existing I-880 HOV lanes that run from Hegenberger Road to Dixon Landing Road in the southbound direction and from Dixon Landing Road to Lewelling Boulevard in the northbound direction to express lanes in 2020. The conversion involved lane striping and installing sign structures, signs, tolling equipment, traffic monitoring video cameras, a data communications network, lighting, median barrier replacement and CHP observation areas. The highway also was widened in three locations to accommodate merge lanes into and out of the future express lanes. The level of service listed in the above table are taken from the 2018 Congestion Management Program Monitoring Report, and thus do not reflect the newly opened HOV/express lanes on I-680 and I-880.
Freedom Circle Focus Area Plan and Greystar General Plan Amendment TA December 22, 2021 Page | 123
Table 19 Santa Clara County Freeway Segment Traffic Operations Freedom Circle Focus Area Plan and Greystar General Plan Amendment TA December 22, 2021 Page | 124
Table 19 (Continued) Santa Clara County Freeway Segment Traffic Operations Freedom Circle Focus Area Plan and Greystar General Plan Amendment TA December 22, 2021 Page | 125
Table 19 (Continued) Santa Clara County Freeway Segment Traffic Operations Freedom Circle Focus Area Plan and Greystar General Plan Amendment TA December 22, 2021 Page | 126
Table 19 (Continued) Santa Clara County Freeway Segment Traffic Operations Peak # of # of Project % of Project % of
Dir Hour Lanes1 Capacity2 Density LOS1 Lanes1 Capacity2 Density LOS1 Density LOS Trips Capacity Density LOS Trips Capacity SR 237 WB AM 2 4,400 98 F 1 1,650 70 F 105 F 199 4.5% 73 F 66 4.0% PM 2 4,400 45 D 1 1,650 11 A 46 D 61 1.4% 11 A 0 0.0%
SR 237 WB AM 2 4,400 92 F 1 1,650 84 F 98 F 196 4.5% 88 F 66 4.0% PM 2 4,400 38 D 1 1,650 14 B 39 D 61 1.4% 14 B 0 0.0%
SR 237 WB AM 2 4,400 103 F 1 1,650 82 F 103 F 0 0.0% 86 F 77 4.7% PM 2 4,400 27 D 1 1,650 15 B 27 D 12 0.3% 16 B 59 3.6%
SR 237 WB AM 2 4,400 95 F 1 1,650 93 F 96 F 38 0.9% 94 F 7 0.4% PM 2 4,400 61 F 1 1,650 38 D 61 F 15 0.3% 39 D 49 3.0%
SR 237 WB AM 3 6,900 89 F 0 -- -- -- 90 F 38 0.6% -- -- -- -- PM 3 6,900 84 F 0 -- -- -- 84 F 15 0.2% -- -- -- --
SR 237 WB AM 2 4,400 51 E 0 -- -- -- 51 E 31 0.7% -- -- -- -- PM 2 4,400 82 F 0 -- -- -- 82 F 13 0.3% -- -- -- --
SR 237 WB AM 2 4,400 36 D 0 -- -- -- 37 D 72 1.6% -- -- -- -- PM 2 4,400 95 F 0 -- -- -- 100 F 141 3.2% -- -- -- --
SR 237 WB AM 2 4,400 39 D 0 -- -- -- 40 D 61 1.4% -- -- -- -- PM 2 4,400 77 F 0 -- -- -- 80 F 130 3.0% -- -- -- --
SR 237 WB AM 2 4,400 28 D 0 -- -- -- 28 D 49 1.1% -- -- -- -- PM 2 4,400 64 F 0 -- -- -- 66 F 110 2.5% -- -- -- --
SR 237 WB AM 2 4,400 65 F 0 -- -- -- 66 F 42 1.0% -- -- -- -- PM 2 4,400 43 D 0 -- -- -- 44 D 108 2.5% -- -- -- --
SR 87 NB AM 2 4,400 95 F 1 1,650 137 F 98 F 81 1.8% 141 F 17 1.0% PM 2 4,400 18 B 1 1,650 12 B 18 C 15 0.3% 12 B 7 0.4%
SR 87 NB AM 2 4,400 113 F 1 1,650 100 F 118 F 106 2.4% 102 F 22 1.3% PM 2 4,400 29 D 1 1,650 10 A 29 D 18 0.4% 10 A 8 0.5%
SR 87 NB AM 2 4,400 108 F 1 1,650 80 F 113 F 112 2.5% 81 F 28 1.7% PM 2 4,400 31 D 1 1,650 20 C 31 D 21 0.5% 20 C 9 0.5%
SR 87 NB AM 2 4,400 58 E 1 1,650 49 E 60 F 144 3.3% 50 E 32 1.9% PM 2 4,400 46 D 1 1,650 17 B 46 E 25 0.6% 17 B 11 0.7%
SR 87 NB AM 2 4,400 35 D 1 1,650 27 D 36 D 124 2.8% 28 D 34 2.1% PM 2 4,400 42 D 1 1,650 15 B 42 D 29 0.7% 15 B 12 0.7%
SR 87 NB AM 2 4,400 93 F 1 1,650 72 F 98 F 151 3.4% 73 F 36 2.2% PM 2 4,400 15 B 1 1,650 11 A 15 B 29 0.7% 11 B 12 0.7%
SR 87 NB AM 2 4,400 102 F 1 1,650 63 F 108 F 149 3.4% 65 F 52 3.2% PM 2 4,400 34 D 1 1,650 13 B 35 D 62 1.4% 13 B 24 1.5%
SR 87 NB AM 2 4,400 51 E 1 1,650 46 D 53 E 146 3.3% 47 E 53 3.2% PM 2 4,400 21 C 1 1,650 7 A 22 C 62 1.4% 7 A 25 1.5%
SR 87 NB AM 2 4,400 62 F 1 1,650 36 D 65 F 186 4.2% 37 D 56 3.4% PM 2 4,400 17 B 1 1,650 4 A 18 B 76 1.7% 4 A 28 1.7%
SR 87 NB AM 2 4,400 128 F 1 1,650 102 F 140 F 193 4.4% 107 F 56 3.4% PM 2 4,400 25 C 1 1,650 8 A 26 C 85 1.9% 8 A 28 1.7%
SR 87 SB AM 2 4,400 21 C 1 1,650 8 A 22 C 82 1.9% 8 A 26 1.6% PM 2 4,400 100 F 1 1,650 36 D 105 F 135 3.1% 37 D 63 3.8% SR 87 SB AM 2 4,400 23 C 1 1,650 4 A 24 C 67 1.5% 4 A 24 1.5% PM 2 4,400 100 F 1 1,650 28 D 105 F 130 3.0% 29 D 62 3.8% SR 87 SB AM 2 4,400 23 C 1 1,650 6 A 23 C 59 1.3% 6 A 22 1.3% PM 2 4,400 94 F 1 1,650 36 D 97 F 103 2.3% 37 D 57 3.5% SR 87 SB AM 2 4,400 30 D 1 1,650 7 A 30 D 59 1.3% 7 A 22 1.3% PM 2 4,400 55 E 1 1,650 28 D 56 E 100 2.3% 29 D 57 3.5% Zanker Rd to N. 1st StN. 1st St to Great America PkwyGreat America Pkwy to Lawrence ExpwyLawrence Expwy to N. Fair Oaks AveAlma Ave to I-280US 101 to Skyport DrSkyport Dr to Taylor StTaylor St to Coleman StColeman Ave to Julian StSkyport Dr to US 101Taylor St to Skyport DrN. Fair Oaks Ave to Mathilda AveMathilda Ave to US 101I-280 to Julian StJulian St to Coleman AveColeman St to Taylor StSR 85 to Capitol ExpwyCapitol Expwy to Curtner AveCurtner Ave to Almaden RdAlmaden Rd to Alma AveCentral Pkwy to SR 85SR 85 to El Camino RealUS 101 to Maude AveMaude Ave to Central Pkwy Existing Conditions
Mixed-Flow HOV Lane
Freeway Segment
Mixed-Flow HOV Lane
Existing + Project
Freedom Circle Focus Area Plan and Greystar General Plan Amendment TA December 22, 2021 Page | 127
Table 19 (Continued) Santa Clara County Freeway Segment Traffic Operations Peak # of # of Project % of Project % of
Dir Hour Lanes1 Capacity2 Density LOS1 Lanes1 Capacity2 Density LOS1 Density LOS Trips Capacity Density LOS Trips Capacity SR 87 SB AM 2 4,400 14 B 1 1,650 6 A 14 B 35 0.8% 6 A 14 0.8% PM 2 4,400 69 F 1 1,650 36 D 71 F 81 1.8% 36 D 33 2.0%
SR 87 SB AM 2 4,400 15 B 1 1,650 8 A 15 B 26 0.6% 8 A 11 0.7% PM 2 4,400 82 F 1 1,650 54 E 84 F 62 1.4% 55 E 29 1.8%
SR 87 SB AM 2 4,400 27 D 1 1,650 6 A 27 D 23 0.5% 6 A 10 0.6% PM 2 4,400 81 F 1 1,650 47 E 83 F 78 1.8% 48 E 28 1.7%
SR 87 SB AM 2 4,400 20 C 1 1,650 8 A 20 C 19 0.4% 8 A 8 0.5% PM 2 4,400 48 E 1 1,650 35 D 49 E 75 1.7% 35 D 25 1.5%
SR 87 SB AM 2 4,400 16 B 1 1,650 6 A 16 B 17 0.4% 6 A 8 0.5% PM 2 4,400 43 D 1 1,650 28 D 44 D 71 1.6% 28 D 21 1.3%
SR 87 SB AM 2 4,400 23 C 1 1,650 6 A 23 C 12 0.3% 6 A 5 0.3% PM 2 4,400 31 D 1 1,650 19 C 31 D 40 0.9% 19 C 14 0.8%
I-680 NB AM 4 9,200 22 C 0 -- -- -- 22 C 0 0.0% -- -- -- -- PM 4 9,200 28 D 0 -- -- -- 28 D 74 0.8% -- -- -- --
I-680 NB AM 3 6,900 39 D 0 -- -- -- 39 D 0 0.0% -- -- -- -- PM 3 6,900 26 C 0 -- -- -- 26 D 73 1.1% -- -- -- --
I-680 NB AM 3 6,900 28 D 0 -- -- -- 28 D 0 0.0% -- -- -- -- PM 3 6,900 22 C 0 -- -- -- 22 C 86 1.2% -- -- -- --
I-680 SB AM 3 6,900 25 C 1 1,650 18 B 25 C 90 1.3% 18 C 17 1.0% PM 3 6,900 40 D 1 1,650 12 B 40 D 3 0.0% 12 B 6 0.4%
I-680 SB AM 3 6,900 24 C 1 1,650 18 B 24 C 85 1.2% 18 C 17 1.0% PM 3 6,900 79 F 1 1,650 16 B 79 F 2 0.0% 16 B 6 0.4%
I-680 SB AM 4 9,200 24 C 0 -- -- -- 24 C 100 1.1% -- -- -- -- PM 4 9,200 95 F 0 -- -- -- 95 F 4 0.0% -- -- -- --
I-880 NB AM 3 6,900 22 C 1 1,650 17 B 22 C 0 0.0% 17 B 0 0.0% PM 3 6,900 28 D 1 1,650 13 B 28 D 32 0.5% 13 B 3 0.2%
I-880 NB AM 3 6,900 27 D 1 1,650 27 D 27 D 0 0.0% 27 D 0 0.0% PM 3 6,900 34 D 1 1,650 20 C 34 D 30 0.4% 20 C 3 0.2%
I-880 NB AM 3 6,900 24 C 1 1,650 11 A 27 D 51 0.7% 11 B 21 1.3% PM 3 6,900 46 D 1 1,650 39 D 53 E 174 2.5% 40 D 64 3.9% I-880 SB AM 3 6,900 60 F 1 1,650 30 D 62 F 200 2.9% 30 D 6 0.4% PM 3 6,900 68 F 1 1,650 28 D 68 F 38 0.6% 28 D 11 0.7%
I-880 SB AM 3 6,900 44 D 1 1,650 36 D 45 D 120 1.7% 36 D -5 -0.3% PM 3 6,900 82 F 1 1,650 38 D 82 F 13 0.2% 38 D 11 0.7%
I-880 SB AM 3 6,900 57 E 1 1,650 122 F 66 F 135 2.0% 129 F 61 3.7% PM 3 6,900 29 D 1 1,650 19 C 33 D 18 0.3% 19 C 11 0.7%
Notes:HOV = high-occupancy vehicle; LOS = level of service.1. Number of lanes and level of service (LOS) on each segment are taken from VTA's 2018 Congestion Management Program Monitoring Report .2. Capacity is based on the capacities cited in VTA's Transportation Impact Analysis Guidelines (2014).Bold indicates a substandard level of service.
Outline indicates an adverse effect associated with the Freedom Circle development.
Mixed-Flow HOV Lane
Existing Conditions Existing + Project
Mixed-Flow HOV Lane
Freeway Segment
Alma Ave to Almaden AveI-280 to Alma AveJulian St to I-280Almaden Ave to Curtner AveCurtner Ave to Capitol ExpwyCapitol Expwy to SR 85Jacklin Rd to Calaveras Blvd / SR 237Calaveras Blvd / SR 237 to Yosemite DrSR 237 to Great Mall PkwyDixon Landing to SR 237SR 237 to Dixon LandingGreat Mall Pkwy to Montague ExpwyMontague Expwy to Great Mall PkwyGreat Mall Pkwy to SR 237Scott Creek Rd to Jacklin RdYosemite Dr to Calaveras Blvd / SR 237Calaveras Blvd / SR 237 to Jacklin RdJacklin Rd to Scott Creek Rd Freedom Circle Focus Area Plan and Greystar General Plan Amendment TA December 22, 2021 Page | 128
Table 20
Alameda County Freeway Segment Traffic Operations
Freedom Circle Focus Area Plan and Greystar General Plan Amendment TA December 22, 2021 Page | 129
Table 20 (continued)
Alameda County Freeway Segment Traffic Operations
Table 21
San Mateo County Freeway Segment Traffic Operations
Freedom Circle Focus Area Plan and Greystar General Plan Amendment TA December 22, 2021 Page | 130
While the SR 87 Corridor Study, dated October 2018, stated that there is no room to expand the freeway, it identified technology-based improvements and innovative solutions to maximize use of the existing infrastructure and lead to lower levels of solo driving and higher use of other available modes of travel along the corridor. Potential improvements identified in the study include converting the southbound ramp from US 101 southbound to SR 87 southbound from one to two lanes, use of shoulders as part-time lanes, converting HOV lanes to express lanes, technology-based improvements, and multimodal improvements. Implementation of TDM measures would reduce vehicle trips generated by the Freedom Circle Focus Area, lessening the project’s effect on nearby freeways. However, even with an aggressive TDM program, the project would have an adverse effect on many freeway segments.
Developments within the Freedom Circle Focus Area should be required to provide fair share funding for the above-listed freeway improvements as they come along if full funding is not secured by then.
Freeway Ramp Traffic Operations
A freeway ramp operations analysis was performed to verify that the nearby freeway ramps have sufficient capacity to serve the projected traffic volumes with the development of the Freedom Circle Focus Area. This analysis consisted of a volume-to-capacity (v/c) ratio evaluation of the freeway ramps at the study interchanges that provide access to the Focus Area. The ramp capacities were obtained from the Highway Capacity Manual 2000, and consider the free-flow speed, number of lanes on the ramp, and ramp metering. It should be noted that the evaluation of freeway ramps is not required based on the VTA’s Transportation Impact Analysis Guidelines, nor are there adopted methodologies and impact criteria for the analysis of freeway ramps.
Freeway ramp traffic operations analysis was conducted for ramps at the following interchanges:
x US 101/Montague Expressway
x US 101/Great America Parkway
x SR 237/Great America Parkway
x US 101/Lawrence Expressway
x SR 237/Lawrence Expressway
Table 22 presents the existing freeway ramp parameters (ramp type, number of lanes, ramp meter locations, and peak-hour traffic volumes) as well as the existing v/c ratio. The existing traffic volume is well below the capacity on all study freeway ramps.
Table 23 presents an analysis of freeway ramps with the trips added by buildout of the Freedom Circle Focus Area. Under existing plus project conditions, all but one study ramp are expected to have sufficient capacity (v/c < 1.0) during both peak hours. The volume on the US 101 Northbound On Ramp from southbound Great America Parkway is expected to exceed the ramp capacity during the PM peak hour due to the buildout of the Freedom Circle Focus Area. This ramp currently has a single lane with ramp metering equipment that limits the ramp capacity to 900 vehicle per hour. The capacity of this ramp could be doubled by widening the ramp to add a second lane for high-occupancy vehicles that merges back to a single lane after the ramp meter. This improvement would require Caltrans approval.
It is recommended that the Freedom Circle Focus Area developments fund this improvement.
Vehicle Queuing Analysis
The analysis of intersection levels of service was supplemented with a vehicle queuing analysis for leftturn lanes at intersections where buildout of the Freedom Circle Focus Area would add a substantial number of left turns. This analysis provides a basis for estimating future storage requirements at the Freedom Circle Focus Area Plan and Greystar General Plan Amendment TA December 22, 2021 Page | 131
Table 22 Existing Freeway Ramp Operations
Interchange Ramp Type Peak Hour Mixed-Flow HOV Meter1 Capacity2 Peak Volume3 v/c Diagonal AM 2,000 248 0.12
PM 2,000 358 0.18
Loop AM 1,800 298 0.17
PM 1,800 270 0.15
Diagonal AM 900 284 0.32
PM 900 517 0.57
Loop AM 1,800 260 0.14
PM 1,800 621 0.35
Diagonal AM 2,000 1,543 0.77
PM 2,000 940 0.47
Diagonal AM 2,000 1,054 0.53
PM 2,000 449 0.22
Diagonal AM 1,800 361 0.20
PM 1,800 823 0.46
Diagonal AM 900 565 0.63
PM 900 693 0.77
Diagonal AM 2,000 605 0.30
PM 2,000 546 0.27
Diagonal AM 2,000 978 0.49
PM 2,000 1,269 0.63
US 101/Lawrence Expressway Diagonal AM 1,800 505 0.28
PM 1,800 349 0.19
Loop AM 1,800 337 0.19
PM 1,800 162 0.09
US 101/Lawrence Expressway Diagonal AM 3,800 1,136 0.30 PM 3,800 1,309 0.34
Diagonal AM 3,800 811 0.21
PM 3,800 1,754 0.46
SR 237/Lawrence Expressway Loop AM 900 282 0.31
PM 900 191 0.21
Diagonal AM 2,000 79 0.04
PM 2,000 620 0.31
Notes:
NB=northbound, SB=southbound, EB=eastbound, WB=westbound, v/c = volume-to-capacity ratio 1 As a conservative approach, if an on-ramp has meter equipment present, the ramp is analyzed assuming it is metered.23 Peak-hour volumes are obtained through intersection counts or the Caltrans Performance Measurement System (PeMS) database.
SR 237/Great America Parkway
EB Off-Ramp to Great America Parkway 1 - -WB On-Ramp from Great America Parkway 1 - Equipment PresentWB Off-Ramp to Great America Parkway 1 - - US 101/Great America ParkwayUS 101/Great America ParkwaySR 237/Great America Parkway - -
SB Off-Ramp to Great America Parkway 1 - -
Equipment
Present
Ramp capacities were obtained from the Highway Capacity Manual, 2000 (pg 25-4), and considered the free-flow speed, the number of lanes on the ramp, and ramp metering. 1 1122 - -
1 -
Equipment
Present
-
NB On-Ramp from Southbound Lawrence ExpresswaySB On-Ramp from Southbound Lawrence ExpresswayNB Off-Ramp to Lawrence ExpresswaySB Off-Ramp to Lawrence Expressway Lanes Existing Conditions
Equipment
Present
NB On-Ramp from Southbound Great America Parkway 1 - Equipment PresentSB On-Ramp from Southbound Great America Parkway 1 1 Equipment PresentNB Off-Ramp to Great America Parkway 1EB On-Ramp from Great America Parkway 1 1WB On-Ramp from Northbound Lawrence Expressway 1 - Equipment PresentEB Off-Ramp to Southbound Lawrence Expressway 1 - -SB On-Ramp from Westbound Montague Expressway 1 1 Equipment Present US 101/Montague Expressway
NB Off-Ramp to Eastbound Montague Expressway 1 - -
Freedom Circle Focus Area Plan and Greystar General Plan Amendment TA December 22, 2021 Page | 132
Table 23 Freeway Ramp Operations under Existing Plus Project Conditions Interchange Ramp Type Peak Hour Capacity1 Peak Volume2 v/c Project Trips Peak Volume % of Capacity v/c NB Off-Ramp to Eastbound Montague Expressway Diagonal AM 2,000 248 0.12 454 702 22.7% 0.35 PM 2,000 358 0.18 310 668 15.5% 0.33
SB On-Ramp from Westbound Montague Expressway Loop AM 1,800 298 0.17 219 517 12.2% 0.29 PM 1,800 270 0.15 212 482 11.8% 0.27
AM 900 284 0.32 173 457 19.2% 0.51
PM 900 517 0.57 595 1,112 66.1% 1.24
Loop AM 1,800 260 0.14 128 388 7.1% 0.22
PM 1,800 621 0.35 184 805 10.2% 0.45
NB Off-Ramp to Great America Parkway Diagonal AM 2,000 1,543 0.77 56 1,599 2.8% 0.80 PM 2,000 940 0.47 179 1,119 9.0% 0.56
SB Off-Ramp to Great America Parkway Diagonal AM 2,000 1,054 0.53 285 1,339 14.3% 0.67 PM 2,000 449 0.22 181 630 9.1% 0.32
AM 1,800 361 0.20 12 373 0.7% 0.21
PM 1,800 823 0.46 221 1,044 12.3% 0.58
Diagonal AM 900 565 0.63 68 633 7.6% 0.70
PM 900 693 0.77 145 838 16.1% 0.93
EB Off-Ramp to Great America Parkway Diagonal AM 2,000 605 0.30 208 813 10.4% 0.41 PM 2,000 546 0.27 174 720 8.7% 0.36
WB Off-Ramp to Great America Parkway Diagonal AM 2,000 978 0.49 52 1,030 2.6% 0.52 PM 2,000 1,269 0.63 -42 1,227 -2.1% 0.61
US 101/Lawrence Expressway AM 1,800 505 0.28 4 509 0.2% 0.28 PM 1,800 349 0.19 -3 346 -0.2% 0.19
Loop AM 1,800 337 0.19 -5 332 -0.3% 0.18
PM 1,800 162 0.09 64 226 3.6% 0.13
US 101/Lawrence Expressway NB Off-Ramp to Lawrence Expressway Diagonal AM 3,800 1,136 0.30 -15 1,121 -0.4% 0.30 PM 3,800 1,309 0.34 263 1,572 6.9% 0.41
SB Off-Ramp to Lawrence Expressway Diagonal AM 3,800 811 0.21 5 816 0.1% 0.21 PM 3,800 1,754 0.46 54 1,808 1.4% 0.48
SR 237/Lawrence Expressway Loop AM 900 282 0.31 -62 220 -6.9% 0.24 PM 900 191 0.21 16 207 1.8% 0.23
Diagonal AM 2,000 79 0.04 56 135 2.8% 0.07
PM 2,000 620 0.31 -155 465 -7.8% 0.23
Notes:
NB=northbound, SB=southbound, EB=eastbound, WB=westbound, v/c = volume-to-capacity ratio 12 Peak-hour volumes are obtained through intersection counts or the Caltrans Performance Measurement System (PeMS) database.3 As a conservative approach, if an on-ramp has meter equipment present, the ramp is analyzed assuming it is metered.
EB Off-Ramp to Southbound Lawrence Expressway
Existing + Project Conditions
WB On-Ramp from Northbound Lawrence Expressway
SR 237/Great America Parkway
Existing Conditions
EB On-Ramp from Great America Parkway Diagonal
US 101/Montague ExpresswayRamp capacities were obtained from the Highway Capacity Manual, 2000 (pg 25-4), and considered the free-flow speed, the number of lanes on the ramp, and ramp metering.
NB On-Ramp from Southbound Lawrence ExpresswaySB On-Ramp from Southbound Lawrence Expressway Diagonal
NB On-Ramp from Southbound Great America Parkway
Diagonal
SB On-Ramp from Southbound Great America Parkway
US 101/Great America ParkwayUS 101/Great America ParkwaySR 237/Great America Parkway WB On-Ramp from Great America Parkway
Freedom Circle Focus Area Plan and Greystar General Plan Amendment TA December 22, 2021 Page | 133
intersections under existing and cumulative plus project conditions, which includes development of both the Freedom Circle Focus Area and the PHDSP Area along with other nearby planned and proposed developments including the Kylli project, City Place, and the Tasman East Specific Plan.
Vehicle queues were estimated using a Poisson probability distribution, described in Chapter 1. The following left-turn movements were selected for evaluation:
x Bowers Avenue and US 101 SB Off-Ramp – Eastbound left turn x Great America Parkway and Mission College Boulevard – Westbound and southbound left turn
x Great America Parkway and Patrick Henry Drive – Southbound and westbound left turn x Great America Parkway and Tasman Drive –Westbound left turn x Marriott Driveway and Mission College Boulevard – Eastbound left turn x Freedom Circle (W) and Mission College Boulevard – Northbound and eastbound left turn x Freedom Circle (E)/Agnew Road and Mission College Boulevard – Northbound, westbound, and eastbound left turn
x Mission College Boulevard and Montague Expressway – Southbound and eastbound left turn x Great America Parkway and SR 237 Westbound Ramps – Northbound and westbound left turn
The queuing analysis results are presented in Table 24. The results show that seven of the nine intersections studied are expected to have insufficient turn lane storage to accommodate the anticipated traffic volumes in the Year 2040. The feasibility of potential improvements to address the queue storage deficiencies is discussed below. It should be noted that this analysis is conservative since the queue storage requirements could be reduced somewhat (up to 10 percent) through the implementation of TDM measures.
Great America Parkway and Mission College Boulevard – Westbound and Southbound Left Turn
Currently there are two left-turn lanes each 250 feet long on the westbound Mission College Boulevard approach. Under existing conditions, the 95th percentile queue exceeds the existing storage by 150 and 100 feet during the AM and PM peak hours, respectively. Planned improvements at this intersection include the addition of a third westbound left-turn lane. Even with this increase in queue storage, the traffic volumes under cumulative plus project conditions would result in queues that spill out of the triple left-turn pocket. The Freedom Circle Focus Area developments will be required to convert Hichborn Drive into a two-way street and construct a fullaccess signalized intersection at Great America Parkway and Hichborn Drive to offset the adverse effect on intersection levels of service. This roadway network change would reduce the traffic volume making the westbound left turn at the Great America/Mission College intersection. With the planned third westbound left-turn lane, traffic reassignment due to the signalization of Great America Parkway and Hichborn Drive, and a 10 percent TDM reduction, the 95th percentile queue would be reduced to 300 feet per lane, which would still exceed the available storage during the AM peak hour. The length of the turn lanes could be extended to accommodate the projected 95th percentile queue (300 feet) by modifying the landscaped median island.
The existing storage capacity for the southbound left-turn movement on Great America Parkway is approximately 200 feet in the inner lane and 600 feet in the outer left-turn lane for an average of 400 feet per lane. Under existing conditions, the available storage is sufficient to accommodate the 95th percentile queue. Under cumulative conditions, this movement is expected to exceed the available storage during both the AM and PM peak hours, with a maximum queue of 725 feet per lane. T he proposed improvements at Great America Parkway and Hichborn Drive would cause some southbound Great America Parkway traffic to divert from turning left at Mission College Boulevard to Freedom Circle Focus Area Plan and Greystar General Plan Amendment TA December 22, 2021 Page | 134
turning left at Hichborn Drive. With the reassignment in traffic due to the improvements at Hichborn Drive and a 10 percent TDM reduction, the 95th percentile queue would be reduced to 575 feet per lane, which would still exceed the available storage during both peak hours. The turn lanes could be extended by modifying the existing landscaped median. However, there is not sufficient space to accommodate the 95th percentile queue at this intersection while also accommodating the queue storage required for the northbound left turn at the Great America/Patrick Henry intersection, which would face lengthy queues as a result of the trips added by the Patrick Henry Drive Specific Plan and Kylli developments.
Freedom Circle Focus Area Plan and Greystar General Plan Amendment TA December 22, 2021 Page | 135
Table 24 Left-Turn Storage Queuing Analysis
Measurement AM PM AM PM AM PM AM PM AM PMExisting Cycle/Delay1 (sec) 78 110 156 140 156 140 156 160 156 160Volume (vph) 569 253 468 445 142 368 29 9 13 209Lanes 2 2 2222 1 1 2 2Volume (vphpl) 285 127 234 223 71 184 29 9 7 105Avg. Queue (veh) 6.2 3.9 10.1 8.7 3.1 7.2 1.3 0.4 0.3 4.6Avg. Queue (ft.) 154 97 254 216 77 179 31 10 7 11695th %. Queue (veh) 10 7 16 14 6 12 3 2 1 895th %. Queue (ft.) 250 175 400 350 150 300 75 50 25 200Storage (ft/ln) 780 780 250 250 400 400 380 380 125 125Adequate (Y/N) YY NN YY Y Y Y NCum + ProjectCycle/Delay1 (sec) 78 110 156 140 156 140 156 160 156 160Volume (vph) 977 404 740 3 1120 3 970 3 1087 3 124 39 110 686Lanes 2 2 3322 1 1 2 2Volume (vphpl) 489 202 247 373 485 544 124 39 55 343Avg. Queue (veh) 10.6 6.2 10.7 14.5 21.0 21.1 5.4 1.7 2.4 15.2Avg. Queue (ft.) 265 154 267 363 525 528 134 43 60 38195th %. Queue (veh) 16 11 16 21 29 29 9 4 5 2295th %. Queue (ft.) 400 275 400 525 725 725 225 100 125 550Storage (ft/ln) 780 780 250 250 400 400 380 380 125 125Adequate (Y/N) YY NNNN YYY N1 Vehicle queue calculations based on cycle length for signalized intersections, and movement delay for unsignalized intersections.2 Assumes 25 Feet Per Vehicle Queued3 The WBL and SBL volumes at Great America Parkway/Mission College Boulevard under cumulative plus project conditions do not reflect the traffic reassignment expected as a result of signalization at the Great America Parkway/Hichborn Drive intersection.
EBL
Bowers Av/US 101 SB Off Ramp Great America Pkwy/Mission College Blvd
WBL SBL
Great America Pkwy/Patrick Henry Dr
SBL WBL
Freedom Circle Focus Area Plan and Greystar General Plan Amendment TA December 22, 2021 Page | 136
Table 24 (continued) Left-Turn Storage Queuing Analysis Measurement AM PM AM PM AM PM AM PM AM PM AM PMExisting Cycle/Delay1 (sec) 156 90 100 100 130 130 130 130 130 130 130 130Volume (vph) 335 270 10 8 47 336 1 4 4 10 213 43Lanes 2 2 1 1 11111122Volume (vphpl) 168 135 10 8 47 336 1 4 4 10 107 22Avg. Queue (veh) 7.3 3.4 0.3 0.2 1.7 12.1 0.0 0.1 0.1 0.4 3.8 0.8Avg. Queue (ft.) 181 84 7 6 42 303 1 4 4 9 96 1995th %. Queue (veh) 12 7 1 1 4 18 1 1 1 2 7 295th %. Queue (ft.) 300 175 25 25 100 450 25 25 25 50 175 50Storage (ft/ln) 270 270 160 160 115 115 150 150 150 150 110 110Adequate (Y/N) N Y Y YY N YYYY N YCum + ProjectCycle/Delay1 (sec) 156 90 100 100 130 130 130 130 130 130 130 130Volume (vph) 722 617 105 28 528 3 1240 3 304 67 206 132 860 479Lanes 3 3 1 1 22111122Volume (vphpl) 241 206 105 28 264 620 304 67 206 132 430 240Avg. Queue (veh) 10.4 5.1 2.9 0.8 9.5 22.4 11.0 2.4 7.4 4.8 15.5 8.6Avg. Queue (ft.) 261 129 73 19 238 560 274 60 186 119 388 21695th %. Queue (veh) 16 9 6 2 15 30 17 5 12 9 22 1495th %. Queue (ft.) 400 225 150 50 375 750 425 125 300 225 550 350Storage (ft/ln) 270 270 160 160 115 115 150 150 150 150 110 110Adequate (Y/N) N Y YY NNN Y NNNN*Volume reflects total EB approach volume in the single shared-lane approach. 1 Vehicle queue calculations based on cycle length for signalized intersections, and movement delay for unsignalized intersections.2 Assumes 25 Feet Per Vehicle Queued3 The NBL volumes at Freedom Circle (W)/Mission College Boulevard under cumulaitve plus project conditions do not reflect the traffic reassignment expected as a result of signalization at the Great America Parkway/Hichborn Drive intersection.
WBL
Great America Pkwy/Tasman Dr Marriott Dwy/Mission College Blvd Freedom Circle (W)/Mission College Blvd Freedom Circle (E)/Agnew Rd/Mission College Blvd
WBL EBL NBL EBL NBL
Freedom Circle Focus Area Plan and Greystar General Plan Amendment TA December 22, 2021 Page | 137
Table 24 (continued) Left-Turn Storage Queuing Analysis Measurement AM PM AM PM AM PM AM PM AM PMExisting Cycle/Delay1 (sec) 130 130 190 190 190 190 52 72 52 72Volume (vph) 129 493 46 730 996 247 141 343 901 944Lanes 1122222222Volume (vphpl) 129 493 23 365 498 124 71 172 451 472Avg. Queue (veh) 4.7 17.8 1.2 19.3 26.3 6.5 1.0 3.4 6.5 9.4Avg. Queue (ft.) 116 445 30 482 657 163 25 86 163 23695th %. Queue (veh) 8 25 3 27 35 11 3 7 11 1595th %. Queue (ft.) 200 625 75 675 875 275 75 175 275 375Storage (ft/ln) 350 350 310 310 700 700 210 210 480 480Adequate (Y/N) Y N Y NN YYYYYCum + ProjectCycle/Delay1 (sec) 130 130 190 190 190 190 52 72 52 72Volume (vph) 287 945 420 730 1420 485 186 809 1159 1162Lanes 1122222233Volume (vphpl) 287 945 210 365 710 243 93 405 386 387Avg. Queue (veh) 10.4 34.1 11.1 19.3 37.5 12.8 1.3 8.1 5.6 7.7Avg. Queue (ft.) 259 853 277 482 937 320 34 202 140 19495th %. Queue (veh) 16 44 17 27 48 19 3 13 10 1395th %. Queue (ft.) 400 1100 425 675 1200 475 75 325 250 325Storage (ft/ln) 350 350 310 310 700 700 210 210 480 480Adequate (Y/N) NNNNN YY N YY 1 Vehicle queue calculations based on cycle length for signalized intersections, and movement delay for unsignalized intersections.2 Assumes 25 Feet Per Vehicle Queued Freedom Circle (E)/Agnew Rd/
Mission College Blvd
EBL SBL EBL NBL WBL/T
Mission College Blvd/Montague Expressway Great America Pkwy/SR 237 Westbound Ramps Freedom Circle Focus Area Plan and Greystar General Plan Amendment TA December 22, 2021 Page | 138
Great America Parkway and Patrick Henry Drive – Westbound Left Turn Under existing conditions, the 95th percentile queue for the westbound left-turn (200 feet per lane) exceeds the available storage (125 feet per lane) during the PM peak hour. Buildout of the Freedom Circle Focus Area would more than triple the traffic volume at this location resulting in a 95th percentile queue of 550 feet per lane. The length of the turn lanes could be extended to approximately 350 feet by restriping the roadway. However, even with this change, queues are expected to spillback into the parking lots of the adjacent properties during the PM peak hour.
Great America Parkway and Tasman Drive –Westbound Left Turn The westbound left-turn queue is expected to grow from 300 feet per lane in two lanes under existing conditions to as much as 400 feet per lane in three lanes in the Year 2040 during the AM peak hour.
The left-turn pocket could be extended from the existing length of 270 feet to 425 feet by modifying the existing landscaped median.
Freedom Circle (W) and Mission College Boulevard – Northbound and Eastbound Left Turn
The 95th percentile queue (450 feet) currently exceeds the available storage (115 feet) for the northbound left-turn movement during the PM peak hour. The addition of a second northbound left-turn lane is recommended at this intersection to offset the adverse effect of Freedom Circle Focus Area developments under cumulative plus project conditions. This improvement can be accomplished within the existing curb-to-curb width. Even with the added lane, the 95th percentile queue is expected to exceed the available storage during both peak hours with a maximum queue of 750 feet per lane. The proposed conversion of Hichborn Drive to a two-way street and construction of a full-access signalized intersection at Great America Parkway and Hichborn Drive would reduce the traffic volume making the northbound left turn at the Freedom Circle (W)/Mission College intersection. With the recommended improvements on the eastbound and northbound approaches, signalization of Great America Parkway and Hichborn Drive, and a 10 percent TDM reduction, the 95th percentile queue would be reduced to 250 feet per lane, which would still exceed the available storage during both peak hours. The recommended dual left-turn lanes should be extended beyond the current turn-lane length to approximately 250 feet by restriping the roadway, and adjacent properties should avoid locating driveways in close proximity to Mission College Boulevard when they redevelop to avoid issues with queue spillback.Under existing conditions, the eastbound left-turn queue can be accommodated within the existing turn pocket storage. However, in the Year 2040, the trips associated with buildout of the Freedom Circle Focus Area are expected to cause the left-turn queue on eastbound Mission College Boulevard to extend up to 425 feet, which would exceed the existing turn pocket length by 275 feet.
The turn lane could be extended to a maximum length of approximately 300 feet by modifying the existing landscaped median. However, there is not sufficient space to accommodate the 95th percentile queue at this intersection due to its proximity to the Marriott Driveway/Mission College Boulevard intersection.
Freedom Circle (E)/Agnew Road and Mission College Boulevard – Northbound, Westbound, and Eastbound Left Turn
Currently, the northbound left-turn lane on the northbound Freedom Circle (E) approach at Mission College Boulevard is approximately 150 feet long. The existing queue storage is sufficient to accommodate the 95th percentile queue under existing conditions. However, the trips associated with buildout of the Freedom Circle development would cause the 95th percentile queue to grow to 300 feet during the AM peak hour and 225 feet during the PM peak hour under cumulative plus project conditions. The existing left-turn lane could be extended to accommodate the projected queue length by restriping the two-way left-turn lane as a dedicated turn lane for another 150 feet. The adjacent Freedom Circle Focus Area Plan and Greystar General Plan Amendment TA December 22, 2021 Page | 139
properties should avoid locating driveways in close proximity to Mission College Boulevard so that site access is not impeded by left-turn queues on Freedom Circle.
The site plan for the proposed Greystar development shows three driveways on Freedom Circle including one at the northern edge of the project site that is only about 70 feet south of Mission College Boulevard. It is recommended that this driveway be limited to right-turns in and out only since it would frequently be blocked by queues on Freedom Circle. Furthermore, vehicles wanting to turn left into this driveway from southbound Freedom Circle would have to stop in the through lane while waiting for a break in traffic flow in the northbound lanes causing traffic on Freedom Circle to back up onto Mission College Boulevard.
The dual left-turn lanes on the westbound Mission College Boulevard approach are only 110 feet long.
Under existing conditions, the 95th percentile queue exceeds the available storage during the AM peak hour. Over 800 vehicles are expected to make this left turn by the Year 2040 in the AM peak hour due to the buildout of the Freedom Circle Focus Area, resulting in a 95th percentile queue of 550 feet per lane. Extending the westbound left-turn lanes to accommodate the projected queue length would require modifications to the median on the San Tomas Aquino Creek bridge.
The trips associated with the Freedom Circle Focus Area also are expected to exacerbate the queue storage deficiency for the eastbound left-turn lane. Currently, the 95th percentile queue (625 feet) exceeds the available storage (350 feet) by about 11 vehicles during the PM peak hour. Traffic growth by the Year 2040 would cause the 95th percentile queue to grow to 1,100 feet during the PM peak hour.
The addition of a second eastbound left-turn lane is not feasible because it would require acquisition of additional right of way in order to add another receiving lane on the north leg (Agnews Road). The existing turn lane could be extended by modifying the landscaped median; however, it is not feasible to accommodate the projected queue length in a single lane due to the proximity of the upstream signalized intersection at Freedom Circle (W).
Mission College Boulevard and Montague Expressway – Southbound and Eastbound Left Turn
Currently there are two left-turn lanes, each 310 feet long, on the southbound Mission College Boulevard approach. Under existing conditions, the queue storage is adequate during the AM peak hour, and the 95th percentile queue exceeds the existing storage by 365 feet during the PM peak hour.
The traffic volumes under cumulative plus project conditions are expected to increase during the AM peak hour resulting in queues that exceed the length of the dual left-turn pocket by 115 feet. The cumulative plus project forecast for the PM peak hour shows that the southbound left-turn volume would be unchanged. The length of the turn lanes cannot be extended due to the proximity of Wyatt Drive.
Under existing conditions, the 95th percentile queue for the eastbound left-turn movement on Montague Expressway currently extends beyond the storage capacity during the AM peak hour. Under Cumulative Plus Project conditions, the 95th percentile queue length is expected to grow to 1,200 feet per lane during the AM peak hour, which exceeds the available storage by 500 feet. The 2040 Expressway Plan identifies a partial grade separation at this intersection that would replace the eastbound dual left-turn lanes with a flyover. The flyover would eliminate signal control of the eastbound left-turn movement and thus resolve the queuing deficiency. The Freedom Circle Focus Area developments would provide fair share funding towards this improvement to offset the adverse effect on this intersection caused by the project. The funds collected for this improvement are subject to programming by the County for Board-approved projects.
Freedom Circle Focus Area Plan and Greystar General Plan Amendment TA December 22, 2021 Page | 140
Great America Parkway and SR 237 Westbound Ramps – Northbound Left Turn The existing storage capacity for the northbound left-turn lane on Great America Parkway is approximately 210 feet, or 8 vehicles per lane. The traffic growth expected by the Year 2040 is estimated to result in a 95th percentile queue length of 325 feet per lane. The left-turn storage cannot be increased because the turn lanes extend to the upstream intersection at the SR 237 Eastbound Ramps.
Signal Warrant Analysis
The study evaluated two unsignalized T-intersections: Old Ironsides Drive/Old Glory Lane and Old Ironsides Drive/Patrick Henry Drive. The Old Ironsides Drive/Old Glory Lane intersection is stop controlled for the westbound Old Glory Lane approach. The Old Ironsides Drive/Patrick Henry Drive intersection is stop controlled on the southbound Old Ironsides Drive approach. Under cumulative conditions, which includes the Patrick Henry Drive Specific Plan Option 2 development, the parcel on the south side of Patrick Henry Drive, opposite to Old Ironsides Drive, is assumed to redevelop and have a driveway that would create a new south leg so that the intersection would have four legs. It was assumed that the intersection would include a single shared approach lane on the south leg. The north leg would be re-striped with one left-turn lane and one shared through/right-turn lane.
The level of service analysis (see Chapters 2 to 5) shows that both intersections would operate at an acceptable level (LOS A) under background no project and background plus project conditions. In the year 2030, neither intersection would meet the signal warrant both with or without the proposed Greystar General Plan or the buildout of the Freedom Circle Focus Area. In the year 2040, both intersections would operate at unacceptable levels (LOS F) and satisfy the signal warrant both with and without the proposed buildout of the Freedom Circle Focus Area during the AM and PM peak hours.
The signal warrant calculations are included in Appendix D.
As noted above, both the proposed Greystar project and the full buildout of the Freedom Circle Focus Area would cause an adverse effect at the intersection of Old Ironsides Drive and Old Glory Lane under cumulative conditions. The Freedom Circle Focus Area developments including the Greystar development should provide fair-share funding towards signalization and the addition of a second southbound left-turn lane, a second eastbound through lane, an exclusive northbound right-turn lane, an exclusive eastbound right-turn lane, and an exclusive westbound left-turn lane. Although the intersection of Old Ironsides Drive and Patrick Henry Drive also would meet signal warrants under cumulative conditions, neither the Greystar development nor the full buildout of the Freedom Circle Focus Area would cause an adverse effect at this intersection. Thus, these developments will not be required to contribute to a new traffic signal or other geometric improvements at this intersection.
Site Access and Internal Circulation
The Freedom Circle Focus Area would maintain the existing roadways and vehicle connections from Great America Parkway and Mission College Boulevard with no new public roadways. Aside from Greystar, which has submitted a formal development application, detailed site plans showing access and circulation for new developments in the Freedom Circle Focus Area have not yet been prepared.
Thus, the analysis of site access and internal vehicular circulation is limited to only the Greystar site.
This review is based on the site plan, dated November 13, 2020 (see Figure 16).
Vehicle Site Access
In the vicinity of the Greystar site, Freedom Circle runs in a north-south direction and serves as the western boundary of the project site. A new two-way semi-circular private street (26 feet wide) is proposed around the perimeter of the Greystar site to provide vehicular connections between parking Freedom Circle Focus Area Plan and Greystar General Plan Amendment TA December 22, 2021 Page | 141
garages in the project area and Freedom Circle. The semi-circular street would connect to Freedom Circle at two locations as shown on Figure 16 and provide access to the parking garages in Buildings A, B, and C. In addition to the proposed site access at each end of the new private street, the proposed Building C parking garage also would have direct access to Freedom Circle via a driveway (24 feet wide) approximately 600 feet south of Mission College Boulevard.
According to the City of Santa Clara Municipal Code, Chapter 18.74 (Parking Regulations), two-way driveways providing access to 25 or more residential parking spaces or garage spaces shall have a minimum width of 26 feet (24-foot pavement with 1-foot clearance on each side).
Recommendation: The width of the parking garage entrances should be modified to satisfy the City’s driveway design standards.
As discussed in the intersection queuing analysis, the northern driveway would be located only about 70 feet south of Mission College Boulevard. It would frequently be blocked by queues on Freedom Circle. Furthermore, vehicles wanting to turn left into this driveway from southbound Freedom Circle would have to stop in the through lane while waiting for a break in traffic flow in the northbound lanes causing queues on Freedom Circle that extend onto Mission College Boulevard.
Recommendation: The northern site driveway should be limited to right turns in and out only.
As shown on Table 7, the Greystar development is estimated to generate 375 vehicle trips (98 inbound and 277 outbound) during the AM peak hour, which would be less than two vehicles entering and about five vehicles exiting every minute. During the PM peak hour, the Greystar project would generate 468 vehicle trips (284 inbound and 182 outbound), which would be about five vehicles entering and three vehicles exiting every minute.
The operation of site driveways were evaluated assuming the northern driveway would be restricted right turns in and out only. The total volume expected to use the northern driveway on Freedom Circle is 68 vehicles (3 inbound and 65 outbound) during the AM peak hour and 54 vehicles (10 inbound and 44 outbound) during the PM peak hour. The total volume expected to use the southern driveway on Freedom Circle is 236 vehicles (69 inbound and 167 outbound) during the AM peak hour and 311 vehicles (202 inbound and 109 outbound) during the PM peak hour. The total volume expected to use the middle driveway is 71 vehicles (26 inbound and 45 outbound) during the AM peak hour and 101 vehicles (72 inbound and 29 outbound) during the PM peak hour. Under background plus project conditions, the outbound traffic at all driveways is expected to experience minor delays corresponding to LOS C or better and would not cause any operational issues on the project site. While southbound left-turn traffic using the two-way left-turn lane on Freedom Circle to turn into the middle and southern driveways may experience minor delays while waiting for a gap in oncoming traffic, the delay is expected to be less than 10 seconds per vehicle on average and result in a 95th percentile queue length of two vehicles. Thus, the projected traffic volumes could be served satisfactorily by the proposed three access points on Freedom Circle with the recommended turn restrictions.
The operation of the Greystar driveways also were evaluated under cumulative conditions with full buildout of the Freedom Circle Focus Area. The Irvine property, which would have a driveway directly opposite the middle Greystar driveway, is assumed to redevelop replacing the existing 419,000 s.f. of office/research and development space with 1,223,000 s.f. of office space and 2,500 multifamily dwelling units. The traffic volumes at this Irvine driveway were estimated based on the trip distribution pattern and the location of other driveways. Figure 16 shows the estimated turning-movement volumes at each of the Greystar driveway intersections. The northern and southern Greystar driveway intersections are expected to operate at an acceptable level with stop control on the driveway (see Table 25). The middle Greystar driveway intersection would operate at an unacceptable level (LOS F) under two-way stop control on the driveways during both the AM and PM peak hours due to the heavy traffic volume projected to use the Irvine driveway. The intersection also would operate at LOS F as a single-lane roundabout. The intersection is expected to meet the peak-hour signal warrant under Freedom Circle Focus Area Plan and Greystar General Plan Amendment TA December 22, 2021 Page | 142
cumulative conditions with full buildout of the Freedom Circle Focus Area due to the traffic volumes at the Irvine driveway. With signalization, the intersection is expected to operate at an acceptable level (LOS C).
Freedom Circle Focus Area Plan TransportaƟon Analysis
Figure 16
Greystar Site Circulation Plan With Cumulative Plus Project Including Greystar Traffic Volumes
AMENITY
DOWN TO B1
GARAGE
BAYSHORE FREEWAY - US 101
FREEDOM CIRCLE DRIVE
SAN TOMAS AQUINO CREEK TRAIL
BLDG B LEVEL
1 GARAGE
ACCESS
PUBLIC PARK/
GUEST/RETAIL/
LEASING ACCESS
ONLY
BLDG A LEVEL
1 GARAGE
ACCESS
BLDG A LEVEL
2 GARAGE
ACCESS
BLDG B LEVEL B1 GARAGE ACCESS
SECURED RESIDENTIAL ACCESS ONLY
UP TO LEVEL
2 GARAGE
BLDG A LEVEL
B1 GARAGE
ACCESS
TO SANTA
CLARA SQUARE
BLDG C
GARAGE
ACCESS TO ALL
LEVELS
BLDG B LEVEL 2 GARAGE ACCESS TWO WAY TRAFFIC
PEDESTRIAN ACCESSBIKE PATHMOVE-IN LOBBY
LEGEND
MOVE-IN / LOADING ZONEREGIONAL BIKE & PEDESTRIAN TRAILPEDESTRIAN PATH
CROSSING
M
I
S
S
I
O
N
C
O
L
L
E
E
L
TO LEVI’S
STADIUM
PASEO
BUILDING A
BUILDING B
2.0 ACRE
PUBLIC PARK
SEE LANDSCAPE PLAN FOR
PARK PEDESTRIAN PATH
BUILDING C
AMENITY
DOWN TO B1
GARAGE
BAYSHORE FREEWAY - US 101
FREEDOM CIRCL
E
SAN TOMAS AQUINO CREEK TRAIL
BLDG B LEVEL
1 GARAGE
ACCESS
RK/
ETAIL/
ACCESS
ONLY
BLDG A LEVEL
1 GARAGE
ACCESS
BLDG A LEVEL
2 GARAGE
ACCESS
BLDG B LEVEL B1 GARAGE ACCESS
SECURED RESIDENTIAL ACCESS ONLY
UP TO LEVEL
2 GARAGE
BLDG A LEVEL
B1 GARAGE
ACCESS
TO SANTA
CLARA SQUARE
BLDG C
GARAGE
ACCESS TO ALL
LEVELS
BLDG B LEVEL 2 GARAGE ACCESS TWO WAY TRAFFIC
PEDESTRIAN ACCESSBIKE PATHMOVE-IN LOBBY
LEGEND
MOVE-IN / LOADING ZONEREGIONAL BIKE & PEDESTRIAN TRAILPEDESTRIAN PATH
CROSSING
M
I
S
S
I
O
N
C
O
L
L
E
L
TO LEVI’S
STADIUM
PASEO
BUILDING A
BUILDING B
2.0 ACRE
PUBLIC PARK
SEE LANDSCAPE PLAN FOR
PARK PEDESTRIAN PATH
BUILDING C
E
E DRIV
PUBLIC PARK
GUEST/RETA
LEASING A
ON 142(95) 25(15) 35(23) 10(6) 0(0) 748(233) 46(25)
207(119) 784(352) 19(51) 225(407) 0(0) 0(0) 81(46) 392(954) 7(21) 65(44) 1217(641) 722(1555) 3(10) 250(859) 25(76) STOP STOP
Freedom Circle Focus Area Plan and Greystar General Plan Amendment TA December 22, 2021 Page | 144
Table 25
Cumulative Levels of Service at Greystar Driveway Intersections On-Site Circulation
The on-site circulation was reviewed in accordance with generally accepted traffic engineering standards. Generally, the proposed plan would provide adequate connectivity through the parking areas for vehicles, bicycles, and pedestrians.
On-site parking for the proposed project would be provided via three separate parking garages (Garages A, B, and C): one for each building. From the southern driveway, the new semi-circular street would first lead to an entrance to the public parking area reserved for guests, retail, and leasing on level 1 of Garage B. The new semi-circular street would then connect to a U-shaped one-way loop between Buildings A and B that would include a passenger loading area and entrances to level 1 of Garages A and B. The one-way U-shaped travel lane would be 20 feet wide, which would meet the City’s standard for a one-way drive aisle. Entrances to garage level 2 and level B1 of Building A would be located at the southwest and southeast corners of the building, respectively. Entrances to garage level 2 and level B1 of Building B would be located at the southwest and southeast corners of the building, respectively. In addition, there would be one entrance to level B1 located along the east side of Building C.
The current site plan does not label the slope of the garage ramps. Commonly cited parking publications recommend grades of up to 16% on ramps where no parking is permitted, but grades of up to 20% are cited as acceptable when ramps are covered (i.e., protected from weather) and not used for pedestrian walkways.
Recommendation:
The garage entrances should be free and clear of any obstructions to optimize sight distance, thereby ensuring that exiting vehicles can see other vehicles traveling on the circular road. Any landscaping and signage should be located in such a way as to ensure an unobstructed view for drivers entering and exiting the garage.
The slopes of all garage ramps should be reviewed to ensure they meet appropriate design standards.
Parking Garages
All parking spaces in the parking garages are oriented at a 90-degree angle from the drive aisles. The 24-foot-wide drive aisles would not meet the City of Santa Clara minimum requirement (25 feet) for 90- degree standard parking spaces on double-loaded drive aisles with two-way traffic.
Intersection LOS
AM 0.5 A
PM 1.1 A
AM 14.2 B
PM 25.1 C
AM 2.3 A
PM 2.5 A
Note:
OWSC = One-Way Stop Control
Freedom Circle and Southern Greystar Dwy OWSC
Freedom Circle and Northern Greystar Dwy
Peak
Hour
Freedom Circle and Middle Greystar Dwy/Irvine
Dwy
Traffic
Control
OWSC
Signal
Avg. Delay
(sec)
Freedom Circle Focus Area Plan and Greystar General Plan Amendment TA December 22, 2021 Page | 145
The site plan shows good circulation through the three-level garage. The parking garages include multiple dead-end drive aisles on each level. Although dead-end aisles are generally undesirable, extra space has been provided to allow a vehicle to turn around, which is acceptable. Dead-end aisles are also not a concern in areas where spaces are reserved for residents.
The parking space dimensions are not marked on the current site plan. According to the City of Santa Clara Municipal Code, Chapter 18.74, standard parking spaces must be 18 feet long and 9 feet wide (10 feet wide if they are next to a wall).
Recommendation: The width of the parking garage drive aisles should be modified to satisfy the City’s driveway design standards.
Prior to final design, the width of the drive aisle and the parking space dimensions should be measured to confirm that they comply with City of Santa Clara standards Emergency Vehicles, Truck Access and Circulation
As shown on the site plan, emergency vehicles would access the project site from the northern driveway on Freedom Circle Drive. The width of the semi-circular street surrounding the project site would be 26 feet wide, which is not wide enough for emergency vehicles to turn around. Therefore, with the current design, emergency vehicles would have to enter from the northern driveway and exit from the southern driveway.
A loading zone is proposed along the south side of Building A and the east side of Buildings B and C.
Loading zones are also proposed on Freedom Circle at the northern and southern edges of the proposed park.
The site plan also shows multiple trash termination rooms in the parking garage for each building.
Trash staging and collection would occur along the proposed perimeter street. Garbage trucks would be able to enter the site from either the northern or southern driveway and circulate through the site without having to turn around on site.
Pedestrian and Bicycle On-Site Circulation
Within the site, pedestrian paths are shown throughout the project site, providing connections between sidewalks on the adjacent streets, the proposed buildings, parking garages, and other amenities onsite. The project site plan shows that the project would provide sidewalks along the inner side of the new semi-circular street surrounding the project area, which would connect the sidewalk on Freedom Circle Drive and lobby entrances in each of the new buildings. The site plan also shows that multiple pedestrian paths would be built crossing the Paseo area between Buildings A and B and the public park between Buildings B and C. The pedestrian paths in the public park area would connect to the sidewalk along Freedom Circle Drive. In addition, the project would construct a new connection to the San Tomas Aquino Creek trail on the east side of the proposed public park. These proposed pedestrian facilities would provide adequate pedestrian circulation within and through the project site.
Improvements to pedestrian facilities that provide access to the project site are discussed below.
The project site plan shows that the project would provide a new bike path on the south edge of public park that would lead to a new connection to the San Tomas Aquino Creek trail. The site plan shows that width of the bike path would vary with a minimum width of 10 feet. Per the City of Santa Clara Bicycle Plan Update 2018, the path should have a minimum width of eight feet with two-foot shoulders on each side. The proposed project also would include bicycle amenities such as bike parking and a bike shop. Bike parking is discussed in the following section.
Freedom Circle Focus Area Plan and Greystar General Plan Amendment TA December 22, 2021 Page | 146
Parking Analysis
The parking analysis focuses on the proposed Greystar development as no other development applications have been submitted for other parcels within the Freedom Circle Focus Area.
As mentioned previously, the proposed Greystar project requires a General Plan Amendment to change the land use designation on the project site from High Intensity Office/R&D to Very High Density Residential. The parking standards for the proposed site will be established in the Freedom Circle Focus Area Plan. It is expected that the Freedom Circle Focus Area Plan will follow the parking standards set forth in the City of Santa Clara Municipal Code §18.23.070. The parking ratios in this section were developed for the Lawrence Station Area Plan.
Vehicle Parking
The parking requirements applicable to the proposed project are listed below. • Minimum 1.0 parking space for every studio and one-bedroom residential unit • Minimum 2.0 parking spaces for every two-bedroom residential unit • Minimum 4.0 parking spaces for every 1,000 square feet for retail uses The proposed Greystar development would include 170 studios, 597 one-bedroom units, and 308 twobedroom units. Based on the parking ratios listed above, the project would be required to provide 1,383 spaces for residential use and 8 spaces for retail uses (see Table 26).
Table 26
Vehicle Parking Analysis
The project would provide 1,383 on-site parking spaces for residential use and 8 spaces on site for retail use, which equals the parking requirement for each use. The Lawrence Station Area Plan does not include public park space, so Santa Clara Municipal Code §18.23.070 does not set parking Required Proposed
Parking Parking
Land Use Spaces2 Spaces2
Residential
Studio 170 units 170
1 BR 597 units 597
2 BR 308 units 616
Total 1,075 units 1,383 1,383
Retail 2,000 s.f. 8 8
Total Vehicle Parking Spaces 1,391 1,391
Notes:
s.f. = square feet
1 2
The number of spaces required is based on the parking ratios set forth in the City of Santa Clara Zoning Code Section 18.23.070.
Proposed parking listed above excludes 20 spaces designated for visitors to the proposed public park.
Proposed
Size
Freedom Circle Focus Area Plan and Greystar General Plan Amendment TA December 22, 2021 Page | 147
standards for this use. As requested by the City’s Parks and Recreation Department, the project would provide 20 parking spaces for park users.
The City of Santa Clara’s VMT Transportation Analysis Policy for Environmental Review sets forth criteria that must be met for a project near a major transit corridor to be considered transit supportive, and thus presumed to have a less than significant impact on VMT. One of the criteria states that transit supportive projects may not include more parking for use by residents, customers, or employees of the project than required by the City Code. As currently proposed, the on-site parking at the Greystar project (1,391 spaces) would equal the City Code required parking. Thus, the proposed parking supply is consistent with a transit supportive project.
Electric Vehicle Parking Spaces
Based on 2019 Green Building Standard Code (CAL Green) (Section 4.106.4.2), for new multifamily dwelling development, 10 percent of total parking spaces on the building site should be electric vehicle charging spaces (EV spaces) capable of supporting future EVSE. The project currently proposes 15% of the parking spaces would be EV-ready or EV-future spaces, which would meet the Cal Green requirements.
Bicycle Parking
The bicycle parking spaces were evaluated based on the requirements set forth in the City of Santa Clara Municipal Code §18.23.070.
x Residential developments: One Class I bicycle parking space per 3 units and two Class II spaces per 15 units.
x Non-residential developments: One Class I space per 30 employees or fraction thereof and two Class II spaces for every 3,000 square feet of floor area.
Based on the above ratios, the Greystar project would be required to provide a total of 501 bicycle parking spaces for the proposed residential uses (with 358 long-term spaces and 143 short-term spaces) and 1 Class I and 2 Class II bicycle parking spaces for the proposed retail use.
As shown on the site plan (Sheet A-000), the project proposes to provide 359 long-term bicycle parking spaces and 35 short-term bicycle parking spaces for a total of 394 bicycle parking spaces for residential uses and 2 spaces (1 long-term space and 1 short-term space) for the proposed retail use. The proposed number of bicycle parking spaces would not meet the required number of short-term bicycle parking spaces, with 38 fewer short-term parking spaces than required.
Recommendation: Short-term (Class II) bicycle parking should be added in accordance with the bicycle parking requirements set forth in the City of Santa Clara Municipal Code §18.23.070.
Effects on Pedestrians, Bicycles, and Transit Facilities The following sections describe the potential impact of the project on pedestrian, bicycle, and transit facilities and services. Impacts are identified based on the significance criteria as described below.
Significance Criteria
Significant impacts to pedestrian or bicycle facilities would occur when a project or an element of the project:
1. Creates a hazardous condition that does not currently exist for pedestrians and bicyclists, or otherwise interferes with pedestrian accessibility to the site and adjoining areas; or Freedom Circle Focus Area Plan and Greystar General Plan Amendment TA December 22, 2021 Page | 148
2. Conflicts with an existing or planned pedestrian or bicycle facility; or
3. Conflicts with policies related to bicycle and pedestrian activity adopted by the City of Santa Clara.
Significant impacts to transit service would occur if the project:
1. Disrupts existing transit services or facilities; or
2. Conflicts with an existing or planned transit facility; or
3. Conflicts with transit policies adopted by the City of Santa Clara or VTA.
Pedestrian Facilities
The project would improve pedestrian access to the Freedom Circle Focus Area. Currently, Mission College Boulevard has sidewalks along both sides of the street between the Mission College Boulevard loop road and Montague Expressway while Freedom Circle has sidewalks along both sides for its entire length. Sidewalks are also present along the south side of Hichborn Drive that connect Great America Parkway with Freedom Circle. The Focus Area currently comprises very large parcels that make walking distances excessive between properties. The plan would implement a fine-grain network of internal bike and pedestrian paths that would improve cross-site connectivity and significantly shorten walking distances.
While the Freedom Circle Focus Area lies adjacent to the San Tomas Aquino Creek Trail, currently the only trail connection in the vicinity is located at Mission College Boulevard. The Freedom Circle Focus Area would provide a new multi-use path along the north edge of the Focus Area that would connect the San Tomas Aquino Creek Trail with Patrick Henry Drive and provide another cross-site connector for bikes and pedestrians. The Greystar site plan also shows the project would add a new trail connection approximately 750 feet south of Mission College Boulevard. This new trail connection would connect to two pedestrian paths on either side of the proposed park and a multiuse bike/pedestrian trail through the park providing public access between the trail and Freedom Circle.
Besides the shopping areas described above, typical destinations for pedestrians include schools, parks, and transit stops. The existing and planned pedestrian network would allow access to all nearby facilities. Parks are planned within the Freedom Circle Focus Area. Additional parks are planned within the Patrick Henry Drive Specific Plan Area and within the proposed Kylli development, both of which are located northwest of the Freedom Circle Focus Area. Bus stops are currently located within the Focus Area on Great America Parkway and Mission College Boulevard. Light rail service is provided along Tasman Drive with the closest station being about a mile north of the Focus Area. Thus, except for schools, which are discussed below, most of the daily needs of future residents could be met within walking distance of the planned mixed-use district.
In summary, the project would have a beneficial impact on pedestrian facilities. It would build several new pedestrian connections, and it is located in an area that is near existing and planned services.
Bicycle Facilities
The area surrounding the Freedom Circle Focus Area has numerous bicycle facilities, including trails and bike lanes. There are north-south trails along Calabazas Creek, San Tomas Aquino Creek, and the Guadalupe River. These trails connect to the Bay Trail on the north edge of Santa Clara. There are east-west bike lanes on Tasman Drive, Mission College Boulevard, and several other streets. There is also a bike and pedestrian bridge over Calabazas Creek that connects to the John W. Christian trail in Sunnyvale.
Freedom Circle Focus Area Plan and Greystar General Plan Amendment TA December 22, 2021 Page | 149
In addition to recreational riding, there would likely be many future residents of the Freedom Circle Focus Area who would ride to work. There are bike lane and bike trail connections to most surrounding employment areas. Existing employment zones to the north of the project could be reached via bike lanes on Great America Parkway or via the San Tomas Aquino Creek trail. Bicyclists could access planned employment in the Kylli development via the proposed new multi-use path along the northern boundary of the Focus Area. There also is a large amount of employment planned as part of the City Place development. This area could be reached via the San Tomas Aquino Creek trail and the bike lanes on Tasman Drive. The same bike lanes on Tasman Drive could be used to reach the employment area in North San José. The Guadalupe River trail could be used to reach downtown San José.
Employment areas south of the project site could be reached via the San Tomas Aquino Creek trail or bike lanes on Great America Parkway/Bowers Avenue. Likewise, the existing and planned bicycle facilities would allow people who work within the Freedom Circle Focus Area to bike to their homes in the Patrick Henry Drive Specific Plan Area, the Kylli development, City Place, and the Tasman East Specific Plan Area.
Consistent with the City’s Bicycle Master Plan Update 2018, Class IV protected bike lanes will be provided on Mission College Boulevard and on Great America Parkway adjacent to the Plan (between US 101 and Patrick Henry Drive). In addition, Freedom Circle would be retrofit to add Class II bike lanes. In summary, the project would have a beneficial impact to bicycle facilities. Also, the Freedom Circle Focus Area is well situated to take advantage of numerous existing bicycle facilities that provide connections to all likely destinations.
Access to Schools
The Freedom Circle Focus Area would generate an increase in school attendance. The Kylli development is planning to build an elementary school as part of the project. This school would be more than one mile away from Freedom Circle Focus Area residential uses, which is beyond walking distance for elementary students. There are no other elementary schools within walking distance of the Focus Area.
Likewise, the Santa Clara Unified School District does not have any middle schools or high schools in the close proximity to the Freedom Circle Area. The nearest schools are several miles away. Given the distance of the schools, no middle school or high school students would be expected to walk, and few students would bicycle. Therefore, students would need to get to school by transit or car.
Transit Services
Bus service in the vicinity of the Focus Area is currently limited due to COVID-19. The VTA expects to resume frequent network service with 15-minute headways on certain routes when ridership levels increase. Existing bus routes serving the Freedom Circle Focus Area include an ACE shuttle and three VTA routes along Great America Parkway and/or Mission College Boulevard. The Freedom Circle Focus Area is located about one mile southeast of the Old Ironsides light rail station on Tasman Drive.
The Focus Area is not served by a Caltrain shuttle. However, VTA route 20 connects to the Sunnyvale Caltrain station, and light rail connects to the Mountain View Caltrain station. Both connections are indirect.
The project would not interfere or conflict with existing or planned transit facilities. To the contrary, the project would contribute to grade separation projects at intersections with light rail in the median, HOV type signal improvements that could support future bus rapid transit facilities, and transit signal priority at signalized intersections. Thus, the project is expected to have a positive effect on transit services at these locations.
Freedom Circle Focus Area Plan and Greystar General Plan Amendment TA December 22, 2021 Page | 150
An evaluation of the effects of project traffic on transit vehicle delay also was completed. The analysis was completed for transit routes that serve the project vicinity utilizing estimated vehicle delay presented in the intersection level of service analysis contained in Chapters 3 and 4. The results of the transit delay analysis are presented in Table 27. The analysis shows that for most routes, the traffic associated with the Greystar project would increase delay to transit vehicles by 15 seconds or less per vehicle. Traffic associated with the buildout of the Freedom Circle Focus Area would have a greater effect on transit vehicle delay. For bus routes 55 and 57, the transit vehicle delay would increase by less than 40 seconds. For bus routes 20, 59, and the ACE Yellow shuttle, the buildout of the Freedom Circle Focus Area would cause transit vehicle delay to increase by roughly 1 to 16 minutes. With the exception of the ACE Yellow route, which currently has a total travel time of roughly 25 minutes from end to end, the other routes shown are quite lengthy with total end-to-end travel times of between 40 and 65 minutes. The required 10 percent TDM trip reduction and the recommended roadway and multimodal improvements would reduce the project’s effect on transit vehicle delay. The VTA has not established policies or significance criteria related to transit vehicle delay. Thus, this data is presented for informational purposes only.
Table 27
Transit Vehicle Delay in Study Area
Summary of Proposed Improvements Related to Other Transportation Issues
A summary of other transportation issues associated with the Greystar General Plan Amendment and with buildout of the Freedom Circle Focus Area, the recommended improvements, and funding responsibilities are provided in Table 28.
Bus Route Study Area Streets Direction AM PM AM PM
20 Eastbound 15.0 11.8 61.9 523.7
Westbound -26.6 -2.1 97.2 561.1
55 Lawrence Expwy, Tasman Dr Northbound -0.1 -0.3 18.2 0.6 Southbound 0.0 0.0 0.0 26.5
57 Northbound -5.8 0.7 32.9 38.4
Southbound -2.4 0.5 7.6 16.1
59 Northbound -2.9 17.2 944.2 317.8
Southbound 10.5 -38.6 53.5 341.4
ACE Yellow Outbound 6.7 74.0
Inbound 7.6 259.5
Note:
Projected increase in transit delay based on a comparison of background vs. background plus project intersection movement delays calculated by TRAFFIX.
Bowers Ave, Scott Blvd, San Tomas Expwy,
Mission College Blvd, Great America Pkwy,
Tasman Dr
Arques Ave/Scott Blvd, Bowers Ave/Great
America Pkwy, Mission College Blvd, Agnew
Rd, Montague Expwy
Scott Blvd, San Tomas Expwy, Mission
College Blvd, Great America Pkwy, Old
Ironsides Dr
Bowers Ave/Great America Pwy, Mission
College Blvd, Tasman Dr, Patrick Henry Dr,
Old Ironsides Dr
Projected Change in Transit Vehicle Delay (sec/veh)
Due to Greystar Due to Freedom Circle Buildout
Freedom Circle Focus Area Plan and Greystar General Plan Amendment TA December 22, 2021 Page | 151
Table 28
Summary of the Proposed Improvements related to Other Transportation Issues Project
Facility / Location Recommended Improvements Responsibility Freeway Segments:
US 101 Convert the existing HOV lane to an express lane and construct a second express lane in each direction along US 101 between Cochrane Road and Whipple Avenue (Valley Transportation Plan 2040)
% of Total Traffic
I-680 Construct an HOV/express lane on northbound I-680 from the SR 237 interchange in Santa Clara County to north of the SR 84 interchange in Alameda County.
% of Total Traffic
1. Implement technology-based and multimodal improvements identified in the SR 87 Corridor Study.
% of Total Traffic
2. Convert the southbound ramp from US 101 southbound to SR 87 southbound from one to two lanes, use of shoulders as part-time lanes, and convert HOV lanes to express lanes.
% of Total Traffic
Freeway Ramps:
US 101 Northbound On Ramp from
southbound Great America Parkway
Add a second lane for high-occupancy vehicles that merges back to a single lane after the ramp meter.
100%
Left-Turn Lane Storage:
18 Great America Parkway and Mission College
Boulevard – Westbound Left Turn
Extend the planned triple left-turn lanes to approximately 300 feet by modifying the median.
100%
18 Great America Parkway and Mission College
Boulevard – Southbound Left Turn
Extend the outermost left-turn lane by approximately 150 feet by modifying the landscaped median.
100%
17 Great America Parkway and Patrick Henry
Drive – Westbound Left Turn
Extend the left-turn lanes to approximately 350 feet by restriping the roadway.
100%
15 Great America Parkway and Tasman Drive
–Westbound Left Turn
Extend the left-turn pocket to 425 feet by modifying the existing landscaped median.
100%
27 Freedom Circle (W) and Mission College
Boulevard – Northbound Left Turn
Add a second northbound left-turn lane and extend the turn-lane to approximately 250 feet by restriping the roadway.
100%
27 Freedom Circle (W) and Mission College
Boulevard – Eastbound Left Turn
Extend the turn lane to approximately 300 feet by modifying the existing landscaped median
100%
28 Freedom Circle (E)/Agnew Road and Mission
College Boulevard – Northbound Left Turn
Extend the left-turn lane to 300 feet by restriping the two-way left-turn lane as a dedicated turn lane
100%
28 Freedom Circle (E)/Agnew Road and Mission
College Boulevard – Eastbound Left Turn
Extend the left-turn lane to approximately 450 feet by modifying the existing lanescaped median.
100%
32 Mission College Boulevard and Montague
Expressway – Eastbound Left Turn
Construct partial grade separation. (Same improvements as proposed under background conditions.)
% of Total Traffic
Signalization:
8 Old Ironsides Drive and Old Glory Lane Install a traffic signal and add a 2nd SB LT lane, a 2nd EB TH lane, a NB RT lane, an EB RT lane, and a WB LT lane (same improvements as proposed under cumulative conditions).
% of Total Traffic
n/a Freedom Circle/Irvine driveway/Greystar drivewaInstall a traffic signal. 100% Bicycle Facilities: *
Mission College Boulevard Construct Class IV protected bike lanes within the Plan Area 100% Great America Parkway Construct Class IV protected bike lanes adjacent to the Plan Area (between US 101 and Patrick Henry Drive).
100%
Freedom Circle Construct Class II bike lanes along the entire length of the street 100% Internal to Greystar site Construct Class I bike/pedestrian trail on the south edge of the public park to connect Freedom Circle with the San Tomas Aquino Creek Trail 100%
* See Tables 11, 16 and 17 for additional off-site bicycle improvements required to offset intersection LOS deficiencies.
SR 87
Memo
To: John Davidson and Alexander Abbe, City of Santa Clara CC: Ray Pendro, MIG, and Chris Butcher, Thomas Law Group From: Phil Gleason and Chris Dugan
Date: May 12, 2022
SUBJECT: Freedom Circle Focus Area Plan and Greystar General Plan Amendment:
Post-Planning Commission EIR Memo for Air Quality Comments This memorandum addresses the portions of the Adams Broadwell Joseph & Cardozo letter received at the City of Santa Clara Planning Commission Meeting on April 13, 2022, as they relate to the air quality, health risk assessment, and greenhouse gas emissions analyses of the Freedom Circle Focus Area Plan/Greystar General Plan Amendment Environmental Impact Report (EIR) (State Clearinghouse Number 2020060425; City of Santa Clara 2021). The responses provided herein this memorandum correspond to the coded comments contained in Attachment A. This memorandum also contains the results of a quantitative construction health risk assessment (HRA) prepared for the Greystar General Plan Amendment Project as Attachment B.
Coded Responses
General Plan Consistency Response: See the end of this memorandum for a detailed response on this matter.
Response 1: The commenter reiterates their assertion that the City has violated CEQA by failing to conduct a quantitative health risk analysis. As responded to in FEIR Response to Comment L4.30, the Draft EIR utilized a robust, qualitative discussion to assess health risks from construction and operational emissions in order to demonstrate the Project would result in a less-than-significant impact.
The Draft EIR’s detailed qualitative analysis supports the conclusion that the Project would result in less-than-significant health risks (i.e., the Project would not result in emissions that would exceed the numerical health risk thresholds provided in Draft EIR Table 5-10, including the cancerogenic health risk threshold). The BAAQMD’s thresholds of significance constitute a basis for disclosing the magnitude of the Project’s health risk impacts. Therefore, the analysis contained in the Project’s EIR explained the nature and magnitude of the impact and determined it to be less than significant.
Nonetheless, to further respond to claims made by the commenter, the City prepared a quantitative construction health risk assessment (HRA) for the Greystar Project, which demonstrates that diesel particulate matter (DPM) emissions associated with construction of the Greystar Project would not result in significant cancerogenic or non-cancerogenic health risk impacts, which is the same conclusion reached in the Project’s EIR. The construction HRA estimated DPM concentrations at receptor locations utilizing the United States Environmental Protection Agency’s (EPA) AERMOD dispersion model, which is an EPA-approved and Bay Area Air Quality Management District (BAAQMD) recommended model for simulating the dispersion of pollutant emissions and FCFAP and Greystar GPA: Post-Planning Commission EIR Memo Page 2 Air Quality Comments
MIG Memorandum May 12, 2022
estimating concentrations of pollutants at specified receptor locations. Estimated DPM pollutant concentrations were translated into potential health risks utilizing California Office of Environmental Health Hazard Assessment (OEHHA) recommended methodologies and assumptions.
The quantitative construction HRA was prepared for two emissions scenarios and under two sets of meteorological conditions utilizing conservative assumptions. All four of the total scenarios evaluated found potential health risks to be less than significant, further affirming the rationale and findings of the EIR.
It should be further noted that when using the meteorological data set recommended by the BAAQMD for the dispersion modeling conducted for the Project, potential cancerogenic health risks estimated for the Project were found to be less than one tenth of the BAAQMD’s cancerogenic health risk threshold of
10.0 excess cancers per million population. See the construction HRA memorandum for additional details regarding the methodology and results of the quantitative construction HRA prepared for the Project.
Response 2: The commenter incorrectly asserts that the City’s responses in the Final EIR indicated that disclosure of potential health risks is not necessary, and the quote provided by the commenter from Final EIR Response to Comment L4.31 is used out of context. The analysis contained in the Draft EIR and the responses provided in the Final EIR were made on a less-than-significant impact determination for potential health risks that could be posed by the Project. The commenter’s excerpt from the Court’s explanation in Sierra Club v. County of Fresno is not applicable to the Project, because whereas the Project in Sierra Club v. County of Fresno was determined to have a significant impact, the Greystar Project was determined to have a less-than-significant impact. As discussed in Response 1, the City prepared a quantitative construction HRA for the Greystar Project that affirms DPM emissions associated with the Project would result in a less-than-significant health risk impact.
Response 3: The commenter references the results of a screening-level HRA prepared by SWAPE. As discussed in Response 1, the City prepared a quantitative construction HRA that determined construction DPM emissions associated with the Greystar Project would not result in a significant health risk impact. The EIR’s qualitative analysis of potential health risk impacts, which is based on substantial evidence, is further supported by the results of the construction HRA prepared for the Project.
Response 4: The commenter refers to responses provided in the Final EIR that identify several assumptions made by SWAPE during the preparation of their screening-level HRA that are not appropriate for the Project. The screening-level HRA prepared by SWAPE, as contained in Final EIR Comment Letter L-4, is not considered substantial evidence for the reasons identified in Final EIR Response to Comment L4.124. This is further evidenced by SWAPE’s revised screening-level HRA that was submitted with this comment letter, dated April 13, 2022, which acknowledges their initial operational cancer risk estimate was, “overestimated” and “artificially inflated” (SWAPE, pg. 7). Nonetheless, as discussed in Response 1, the City prepared a quantitative construction HRA that determined construction DPM emissions associated with the Greystar Project would not result in a significant health risk impact.
Response 5: The commenter incorrectly suggests that the utilization of off-road equipment meeting U.S. EPA / CARB Tier III or Tier IV emissions standards, as was FCFAP and Greystar GPA: Post-Planning Commission EIR Memo Page 3 Air Quality Comments
MIG Memorandum May 12, 2022
analyzed in the Draft EIR based on information provided by the Project Applicant, should have been incorporated as a mitigation measure to avoid a significant impact. As described in Response 1, a quantitative construction HRA was prepared for the Greystar Project. The quantitative construction HRA evaluated two emissions scenarios: Scenario 1, which was based on the equipment type and engine classification provided by the Applicant and analyzed in the Draft EIR, and Scenario 2, which was based on average county-wide emissions rates derived from CARB’s OFFROAD2021 emission factor database for the various pieces of off-road equipment that are anticipated for use on the Project. Scenario 2 evaluated the same equipment type (e.g., scraper, grader, etc.), runtime hours, engine horsepower, etc., as Scenario 1. The only difference being that the equipment’s emissions rates for Scenario 2 are based on county-wide data (obtained from CARB’s official off-road diesel equipment emissions inventory/model) as opposed to the specific U.S. EPA / CARB Tier III or Tier IV standards identified in the EIR. The results of the emissions analysis between Scenario 1 and Scenario 2 revealed that the average county-wide off-road emissions factor in the Santa Clara Sub-Area for Year 2022 was between U.S.
EPA / CARB Tier III and Tier IV standards (see more on this under the “Discussion of Scaling Health Risk Values” subheading on page 10 of the construction HRA memorandum). As such, the engine tier classification data provided by the Project Applicant is consistent with what is expected to be used for a typical project occurring in the Santa Clara Sub-Area for Year 2022. As detailed in the construction HRA memorandum, potential health risks associated with Greystar Project were found to be less than significant based on both emissions scenarios. Thus, it can be reasonably inferred that even if the specific engine tier equipment identified by the Project Applicant were not used for the Project – which is not anticipated to be the case – that the use of average engine tier of equipment operating in the Santa Clara Sub-Area also would result in a less-than-significant impact. The commenter, therefore, is incorrect that the EIR needs to incorporate the use of equipment meet U.S. EPA / CARB Tier III or Tier IV emissions standards as a mitigation measure, because no significant impact would occur with the use of other construction equipment typically used in the Project’s region, in the year during which construction activities would be occurring. Regardless, because the applicant proposed using Tier III and Tier IV equipment as part of the project, such equipment will be required as part of the conditions of approval.
Response 6: The commenter summarizes that the EIR’s analysis of the Greystar Project’s construction emissions are based on a list of heavy-duty off-road equipment that would be used during construction, as provided by the Project Applicant, including the engine tier classification. This comment is introductory and does not require further response.
Response 7: The commenter summarizes the commenter’s interpretation of the Court’s holding in Lotus v. Department of Transportation. This comment is introductory and does not require further response.
Response 8: The commenter incorrectly asserts that the EIR, by incorporating the use of Tier III and Tier IV off-road construction equipment into the EIR’s analysis, has compressed the analysis of impacts and mitigation measures into a single issue.
The proposed Project is not like the Lotus case for several reasons, and has not compressed the analysis of impacts into a single issue.
FCFAP and Greystar GPA: Post-Planning Commission EIR Memo Page 4 Air Quality Comments
MIG Memorandum May 12, 2022
First, as described in Response 5, the quantitative construction HRA memorandum prepared for the Greystar Project analyzed emissions from two scenarios, and found that the average county-wide off-road emissions factor in the Santa Clara Sub-Area for Year 2022 was between U.S. EPA / CARB Tier III and Tier IV standards. It should be further noted that the Tier III and Tier IV emissions standards for new equipment started being phased-in in 2006 and 2008, respectively, approximately 17 and 15 years prior to when construction activities associated with the Greystar Project are anticipated to start. To phrase this differently – Tier III and Tier IV equipment have been on the market for almost two decades at this point, and most, if not all, Tier I and Tier II equipment have been phased out of the construction fleets operating in the Santa Clara region (based on the emissions profile reflected in OFFROAD2021). While some older equipment may still be in use in the area, even when it is assumed that such lower tier equipment may be included in the construction fleet for a project, the average emission factor for construction equipment in the region nevertheless exceeds Tier III standards (given that more Tier III and Tier IV equipment is in circulation than older, lower tier equipment) and, for that reason, standard modeling (i.e., that evaluated in Scenario 2 of the quantitative construction HRA) accounts for an off-road equipment emissions profile above Tier III. Thus, even if, as OFFROAD2021 assumes, some lower tier equipment may be included in the construction fleet, the Project’s potential impact would remain less than significant. As the developer committed not to use any lower tier equipment, the emission profile for the Project has the potential to be even lower than using standard modeling assumptions. The use of Tier III and Tier IV equipment is not unique or special to this Project or region; rather, it is consistent with national, state, and county-wide conditions. Thus, it is more than reasonably foreseeable, indeed, highly likely, that Tier III and Tier IV equipment would be used even if not proposed as part of the Project and required as a condition of approval.
Second, unlike the Lotus case, the EIR has not identified any specialized operating conditions for off-road construction equipment that could be construed as “avoidance, minimization and/or mitigation measures.” The EIR’s analysis is based on typical conditions under which off-road construction equipment would operate, and the use of heavy-duty off-road equipment is necessitated for almost every single construction project of similar scope and size as the Greystar Project.
Third, the Draft EIR contained a full, robust analysis for each environmental impact that was related to the operation of heavy-duty off-road construction equipment. The EIR made significance determinations based on substantial evidence regarding criteria air pollutant emissions, toxic air contaminants, and greenhouse gas emissions that could be released from the Project. The Draft EIR analyses did not “compress the analysis” of impacts into a single issue.
Finally, information regarding construction equipment operating assumptions; construction phasing; worker, vendor, and hauling trips; and other construction parameters (e.g., quantity of soils for off-haul) was requested at the onset of environmental review as part of a data request and prior to any analysis conducted to evaluate the significance of Project’s air quality or greenhouse gas emissions, including potential health risks posed by receptor exposure to DPM emissions. The BAAQMD recommends “construction-related TAC and PM impacts should be addressed on a case-by-case basis, taking into consideration FCFAP and Greystar GPA: Post-Planning Commission EIR Memo Page 5 Air Quality Comments
MIG Memorandum May 12, 2022
the specific construction-related characteristics of each project…” (BAAQMD CEQA Guidelines 2017; pg. 2-7, pg. 8-7, emphasis added). Thus, the Project’s approach to assessing air quality and greenhouse gas emissions is consistent with guidance provided by the BAAQMD, and the City has made a good-faith effort to disclose potential impacts associated with the Project by utilizing known project-specific information in its analysis.
The EIR analyzed potential impacts associated with construction of the Greystar Project utilizing construction activity information that was available, including the engine tier of the heavy-duty off-road equipment that would be used for the Project, and analyzed potential impacts using established thresholds of significance. The Tier III and Tier IV heavy-duty off-road equipment analyzed in the EIR is readily available on the market, and the average emission rates are consistent with the overall off-road construction fleet utilized throughout the Santa Clara Sub-Area based on data obtained from CARB’s OFFROAD2021 model. The Project does not require any unique equipment, construction practices, or operating characteristics. The EIR has not compressed the analysis of impacts and mitigation measures into a single issue. Therefore, the use of Tier III and IV equipment does not need to be included in the MMRP, and the EIR does not need to be recirculated.
Further, the commenter’s claim that features of a project cannot be considered as such when “their purpose are [sic] to reduce adverse impacts” has no support in case law. Many projects as proposed include features that effect the project’s potential environmental impacts. For example, the Greystar Project includes a public park and pedestrian pathways, which necessarily effect various potential impacts of the project including transportation and recreation impacts. There is no requirement that such features be characterized as mitigation. Further, such a principle would prohibit project proponents from incorporating environmentally beneficial features into their initial project planning efforts, which is contrary to CEQA’s intent. (See, e.g., CEQA Guidelines, § 15124(c) [a project description shall identify a project’s “environmental characteristics” and “principal engineering proposals”]; see also CEQA Guidelines, Appendix F(II)(A)(3) [stating the project description shall identify “[e]nergy conservation equipment and design features”].)
Finally, the quantitative construction HRA prepared by MIG supports and amplifies the conclusion in the EIR that the Greystar Project’s pollutant concentrations of DPM do not result in significant health risks to sensitive receptors. As demonstrated in this analysis, the impact is less than significant regardless of whether the Applicant proposed to use Tier III and IV equipment, because, even absent the Applicant’s commitment not to use of lower tier equipment, the average county-wide off-road emissions factor in the Santa Clara Sub-Area for Year 2022 is between U.S. EPA / CARB Tier III and Tier IV standards. As the Applicant’s commitment to use Tier III and Tier IV equipment is not required to reduce potential health risk impacts to a less-than-significant level, that commitment does not constitute mitigation pursuant to CEQA. “[M]itigation measures are not required where the environmental effect is insignificant.” (Laurel Heights Improvement Assn. v. Regents of University of California (1993) 6 Cal. 4th 1112, 1141.) In short, the City disagrees that CEQA requires an EIR to identify all project features included in a project description, which reduce a project’s potentially significant environmental impacts, as mitigation measures. However, here, whether called mitigation or not, the FCFAP and Greystar GPA: Post-Planning Commission EIR Memo Page 6 Air Quality Comments
MIG Memorandum May 12, 2022
developer’s commitment to use Tier III and IV equipment (which is included in the Greystar Project’s conditions of approval) is not required to comply with CEQA.
Biology Response: See the end of this memorandum for a detailed response on this matter.
Response 9: The commenter indicates they have reviewed the Project’s Draft EIR and Final EIR and purports an updated EIR should be prepared to address the errors they allege are in the EIR. As described in Responses to Comments 10 through 41, the Final EIR has adequately and appropriately assessed the proposed Project’s air quality and health risk impacts. The significance of the air quality impacts have been accurately identified and mitigated as required by CEQA. The significance determinations made in the EIR are further affirmed by the results of the construction HRA prepared for the Greystar Project (see Response 1).
Response 10:The commenter presents results contained in Draft EIR Section 5.3.3, including Table 5-16, and a summary of the Draft EIR’s findings for the Project’s operational criteria air pollutant emissions. The commenter specifically identifies the Draft EIR’s conclusions that the Freedom Circle Focus Area Plan’s operational NOx and ROG emissions would exceed applicable BAAQMD thresholds. This comment does not identify any deficiencies or inadequacies in the emissions modeling or analysis contained in the Draft EIR. No further response is required.
Response 11:The commenter presents language contained in Draft EIR Section 5.3.3 explaining the significant and unavoidable findings made for the Project’s operational criteria air pollutant emissions even after the incorporation of feasible mitigation measures. This comment does not identify any deficiencies or inadequacies in the emissions modeling or analysis contained in the Draft EIR.
No further response is required.
Response 12:The commenter states that the Draft EIR’s conclusion that the Freedom Circle Focus Area Plan’s operational criteria air pollutant emissions would be significant and unavoidable is incorrect and cites CEQA Guidelines § 15096(g)(2). The comment is introductory and lacks specificity.
Response 13:The commenter states that that although the Project has incorporated Mitigation Measures 5-3C and 5-3D, which address emissions from architectural coatings and mobile sources (via a Transportation Demand Management program), the Draft EIR and Final EIR have failed to implement all feasible mitigation measures. The commenter recommends additional feasible mitigation measures should be incorporated and provides a list of suggested measures at the end of the letter.
It should be noted that although this comment specifically addresses operational criteria air pollutant emissions from the Freedom Circle Focus Area Plan, that the overwhelming majority of mitigation measures recommended by the commenter do not address operational emissions; rather, they address construction emissions. As detailed in the Draft EIR and Final EIR, and further affirmed through the construction HRA prepared for the Greystar Project, the Greystar Project would not result in a significant impact related to its criteria air pollutant emissions or DPM emissions, and mitigation is not required. The Project has incorporated mitigation at the programmatic level (Mitigation Measures 5-3A, 5- 3D, and 5-5) to address potential construction air quality impacts associated with future development proposed within the Focus Plan Area.
FCFAP and Greystar GPA: Post-Planning Commission EIR Memo Page 7 Air Quality Comments
MIG Memorandum May 12, 2022
The commenter has provided no evidence that the Project’s significant-andunavoidable impact determination for the Freedom Circle Focus Area Plan’s operational criteria air pollutants is unsubstantiated, nor has the commenter identified additional feasible mitigation measures that would further reduce the magnitude of the impact. Further, the duty to condition project approval on incorporation of feasible mitigation measures only exists when such measures would “substantially lessen” a significant environmental effect. (Public Resources Code, § 21002; State CEQA Guidelines, § 15021, subd. (a)(2).) Thus, a lead agency need not, under CEQA, adopt every nickel and dime mitigation scheme brought to its attention or proposed in the project EIR. (San Franciscans for Reasonable Growth v. City and County of San Francisco (1989) 209 Cal.App.3d 1502, 1519.) The EIR’s significance conclusions are substantiated, and all feasible mitigation has been incorporated. The preparation of an updated EIR is not required as suggested by the commenter. See Responses 32 through 41 for a point-by-point response to each mitigation measure recommended by the commenter.
Response 14:The commenter presents an excerpt from the Draft EIR that discusses operational emissions of ROG, NOx, and PM from mobile sources in the Freedom Circle Focus Area Plan Area. This comment is introductory and lacks specificity. No further response is required.
Response 15:The commenter presents Mitigation Measure 5-3D from the Draft EIR. This comment is introductory and lacks specificity. No further response is required.
Response 16: The commenter suggests that EIR Mitigation Measure 5-3D, which requires residential and office land uses within the Freedom Circle Focus Area Plan to prepare and implement TDM Programs, is insufficient, because the measure, “fails to tangibly consider potential actions that could achieve the measure’s performance standard” (SWAPE, pg. 3). The existence of TDM Programs as well as their implementation and the menu of options available for achieving the goals of a TDM Program are not new concepts. The Valley Transportation Agency’s Requirements for Deficiency Plans, referenced in the City’s 2010-2035 General Plan EIR, identifies TDM Programs for the region dating as far back as 1992, approximately three decades prior to the preparation of the EIR (Santa Clara 2011; pg. 84). TDM Programs (and the measures that comprise the programs) have also been identified in the City’s 2010-2035 General Plan (Santa Clara 2010; pg. 140) and 2013 Climate Action Plan (Santa Clara 2013; pg. 89).
Furthermore, the Draft EIR includes examples of potential TDM measures throughout the document, including:
• Draft EIR pg. 5-31, which states, “The land uses would be required to comply with the City of Santa Clara’s Climate Action Plan and General Plan, which require the development and implementation of TDM measures. The TDM plans could include measures such as transit subsidies, carpool incentives, bicycling incentives, carshare memberships, additional last mile services, and/or vanpools.” • Draft EIR pg. 5-34, which states, “Telecommuting is an example of a measure that could be implemented through a TDM plan that would reduce single-occupancy vehicle trips and VMT.”
• Draft EIR pg. 17-34: “The following are example TDM measures that could be considered: providing both short- and long-term bicycle parking in convenient, secure and prominent locations in each building; providing FCFAP and Greystar GPA: Post-Planning Commission EIR Memo Page 8 Air Quality Comments
MIG Memorandum May 12, 2022
information about transit options and passes; distributing transportation news and commuter alerts; and providing information to residents (through links to appropriate websites, apps and other resources like “511”); and assisting with rideshare matching, which would also reduce single-occupancy vehicle trips and VMT.”
The implementation of the example TDM measures identified above would be more than adequate for achieving the performance standard specified in Mitigation Measure 5-3D. For example, according to the California Air Pollution Control Officers Association (CAPCOA) Handbook for Analyzing Greenhouse Gas Emission Reductions, Assessing Climate Vulnerabilities, and Advancing Health and Equity, a transit subsidy program can result in up to a 5.5% reduction in vehicle emissions from employees/residents accessing the site (Measure T-9), providing information in transit options and passes can result in up to a 4% reduction in vehicle emissions from employees/residents accessing the site (Measure T-7), and providing a ridesharing program can result in up to a 8% reduction in vehicle emissions from employees/residents accessing the site (Measure T-8) (CAPCOA 2021). As noted in the CAPCOA document, the emissions reductions associated with TDM measure implementation can be paired/packaged together for increased (i.e., stacking) reductions (CAPCOA 2021, pg. 92).
Furthermore, the term “TDM measures” does not need to be redefined within the mitigation measure itself – examples of TDM measures have been well documented historically, and definitions and examples of TDM measures have been provided numerous times throughout the City’s planning documents, including the Draft EIR itself. The potential actions covered under the implementation of TDM measures would feasibly achieve the performance standard set forth by the mitigation measure. Mitigation Measure 5-3D is adequate per CEQA Guidelines Section 15126.4(a)(1)(B), and the Draft EIR and Final EIR both adequately address and mitigate the Project’s significant mobilesource operational emissions.
Response 17:The commenter reiterates the assertion made in their December 17, 2021, comment letter that the Draft EIR failed to adequately evaluate the proposed Project’s potential health risk impacts. The commenter indicates they have identified five reasons to support their assertion. This comment is introductory and lacks specificity. See Responses 18 through 28 for detailed responses on this matter.
Response 18:The commenter quotes a section of Response to Comment L4.119 from the Final EIR that concerns the construction emission rate for DPM that SWAPE had calculated. This comment is introductory. No further response is required.
Response 19:The commenter responds to a portion of Final EIR Response to Comment L4.119 indicating that the screening-level construction HRA they prepared only utilized on-road mobile source emissions and argues that the DPM emissions rate they used in the screening-level analysis was not overestimated.
Comment noted. As described in Response 1, the City prepared a quantitative construction HRA that evaluated potential health risks at residential receptors that could be exposed to construction DPM emissions associated with the Greystar Project. The results of the construction HRA affirm the Draft EIR’s determination that construction DPM emissions associated with the Greystar Project would not result in a significant health risk impact.
FCFAP and Greystar GPA: Post-Planning Commission EIR Memo Page 9 Air Quality Comments
MIG Memorandum May 12, 2022
Response 20:See Response 19.
Response 21:The commenter quotes a section of Response to Comment L4.119 from the Final EIR related to BAAQMD guidelines for health risk assessments. This comment is introductory. No further response is required.
Response 22:The commenter acknowledges that the screening-level construction HRA they prepared incorrectly utilized PM10 exhaust emissions when it should have utilized PM2.5 exhaust emissions. See Response 19.
Response 23:See Response 19. The commenter has failed to acknowledge the deficiencies in their derivation of an operational emissions rate for a health risk assessment, as detailed in Final EIR Response to Comment L4.119. The commenter continues to improperly use the sum of all emissions sources included in CalEEMod (i.e., area, energy, and mobile) for their comparison purposes. As discussed in Final EIR Response to Comment L4.119, it is incorrect to assume that all PM2.5 exhaust emissions from the Project would be 100 percent DPM. The commenter’s April 13, 2022, comment letter does not respond to or address any of the issues raised in Final EIR Response to Comment L4.119, nor have they provided any additional information to support their derivation of the operational emissions rate utilized in their December 17, 2021, comment letter. The actual DPM emission associated with operational activities would only be a minor subset of the mobile source emissions, which would be distributed throughout the city, county, and region in proximity of the Project site as vehicles travel on the regional transportation network. Thus, the fact that the commenter notes that, “the difference between operational PM10 exhaust emissions and PM2.5 exhaust emissions… is negligible” (SWAPE, pg. 6) is immaterial to the argument at hand.
The PM2.5 exhaust emissions total of approximately 0.1088 tons / year is not representative of operational DPM emissions and is an incorrect assumption by the commenter. The commenter has not provided any evidence that the Project would result in significant operational health risk impact and continues to incorrectly conflate sources contributing to DPM emissions.
Response 24:The commenter quotes a section of Response to Comment L4.119 from the Final EIR related to unmitigated vs. mitigated operational emissions rate from the Greystar Project. This comment is introductory. No further response is required.
Response 25:The commenter indicates they used the “mitigated” operational emissions estimates, not the “unmitigated” operational emissions estimates, for the Greystar Project during the preparation of their screening-level operational health risk assessment contained in their December 17, 2021, comment letter.
Comment noted. As shown in the unmitigated and mitigated Greystar Residential Development CalEEMod output files, Draft EIR pgs. 1238 and 1152, respectively, the PM2.5 exhaust emission for operation mobile sources are both estimated to be approximately 0.0272 tons / year. This is because the operational mobile source emissions estimates shown in the “Greystar Residential Development (2030; Mitigated)” file (Draft EIR pg. 1152) does not reflect the application of Mitigation Measure 5-3D. Mitigation Measure 5-3D, while applicable to the Greystar Project because it falls within the programmatic EIR’s analysis, was not quantified in the emissions modeling. This is because Mitigation Measure 5-3D was not needed to demonstrate that the Greystar Project’s air quality and greenhouse gas emissions would be less-than-significant on the project-level.
Thus, the mobile source emissions reductions associated with the Greystar Project’s mobile source emissions would be lower than that shown in the Draft FCFAP and Greystar GPA: Post-Planning Commission EIR Memo Page 10 Air Quality Comments
MIG Memorandum May 12, 2022
EIR. Additional information is provided below on the additional reductions in mobile source emissions that would occur through the Greystar Project implementing Mitigation Measure 5-3D.
Implementation of Mitigation Measure 5-3D would decrease the mobile source emissions shown in the “Greystar Residential Development (2030; Mitigated)” CalEEMod file by approximately 14%. As shown in Hexagon’s Transportation Analysis, Draft EIR pg. 1492, Table 7, the Greystar Project’s trip generation would be decreased by approximately 5.6 percent based on reductions from fewer internal trips, fewer external public transit trips, and fewer retail passby trips. Thus, the implementation of Mitigation Measure 5-3D for the Greystar Project, which requires a minimum reduction in VMT of 20 percent, is anticipated to reduce Greystar Project mobile source emissions by approximately 14 percent more than that shown in the “Greystar Residential Development (2030; Mitigated)” CalEEMod file. Applying Mitigation Measure 5-3D to the “Greystar Residential Development (2030; Mitigated)” CalEEMod file would further reduce already less-than-significant impacts at the project-level.
Response 26:The commenter quotes portions of Final EIR Response to Comment L4.119 related to the operational emissions rate the commenter had used for the operational HRA that was included in their December 17, 2021, comment letter.
This comment is introductory. No further response is required.
Response 27:The commenter acknowledges that the operational DPM emissions rate they utilized was overestimated and indicates that a more refined estimated of on-site DPM emissions was not utilized, because the Draft EIR did not provide on-site DPM emissions associated with the Project.
Comment noted. It should be reiterated that the operational HRA prepared by the commenter (contained in their December 17, 2021, comment letter) contained several incorrect assumptions regarding the methodology used to derive the DPM emissions rate, and the health risk estimates prepared by the commenter are not at all reflective of the Project. The actual DPM emission associated with operational activities would only be a minor subset of the mobile source emissions, which would be distributed throughout the city, county, and region in proximity of the Project site as vehicles travel on the regional transportation network. The operational DPM emissions would not come from the area sources, energy sources, or majority of mobile sources as had been assumed by the commenter.
The commenter’s operational HRA health risks were overestimated and artificially inflated, as acknowledged by the commenter. The operational HRA prepared by the commenter does not constitute substantial evidence of a significant impact. See also Response 19 regarding construction health risks associated with the Project.
Response 28:The commenter re-presents the results of their screening-level construction HRA.
As noted by the commenter in Response 29, the screening-level HRA is known to be conservative. The refined quantitative construction HRA prepared for the Greystar Project takes into account site specific details, including an emissions breakdown by construction year, emissions assignments to the specific areas in which the emissions would occur, topography, and meteorological conditions at the site. Thus, the quantitative construction HRA prepared for the Project reflects a more accurate portrayal of the Project’s emissions and health risks than the screening-level HRA prepared by the commenter. See Response 19.
FCFAP and Greystar GPA: Post-Planning Commission EIR Memo Page 11 Air Quality Comments
MIG Memorandum May 12, 2022
Response 29:The commenter accurately quotes a section of the U.S. EPA’s “Exposure Assessment Tools by Tiers and Types - Screening-Level and Refined” that provides an overview of exposure assessment tools. This comment is introductory. No further response is required.
Response 30:The commenter suggests that an updated, refined quantitative HRA should be prepared, because their screening-level analysis indicates a potentially significant impact. See Response 19. The commenter has not provided any evidence of a potentially significant operational health risk impact. The analysis contained on page 5-55 of the Draft EIR provides the rationale for the less-thansignificant operational health risk conclusion. Final EIR Response to Comments L4.30, L4.32, and L4.124 provide additional context regarding the appropriateness of the Project’s operational health risk assessment. Thus, no quantitative operational HRA was prepared.
Response 31:The commenter purports their analysis demonstrates that the Project would result in a significant air quality impact, and that further mitigation should be identified to reduce the Project’s emissions, citing the Southern California Association of Government’s (SCAG) 2020 RTP/SCS Programmatic EIR’s Air Quality Project Level Mitigation Measures (“PMM-AQ-1”). This comment is introductory. No further response is required.
Response 32:The commenter identifies SCAG RTP/SCS 2020-2045 PMM-AQ-1(m), which includes recommendations for reducing fugitive dust by having an operational water truck on-site at all times and sweeping paved streets at least once per day.
The actions proposed by SCAG RTP/SCS 2020-2045 PMM-AQ-1(m) are already incorporated into the Project through Draft EIR Mitigation Measures 5-3A and 5- 4A. Thus, the actions proposed by this measure would not be anything additional or new beyond that already addressed or covered in the EIR. Implementation of Draft EIR Mitigation Measures 5-3A and 5-4A would reduce the significance of fugitive dust emissions during construction to less than significant, consistent with the BAAQMD significance thresholds. No additional mitigation is required.
This additional mitigation measure has not been incorporated into the EIR.
Response 33:The commenter identifies SCAG RTP/SCS 2020-2045 PMM-AQ-1(n), which includes recommendations for utilizing existing power sources or clean fuel generators rather than temporary power generators.
As discussed under Draft EIR Impact 5-4 (Draft EIR pg. 5-43) and Impact 5-7 (Draft EIR pg. 5-54) the Greystar Project would not result in a significant criteria air pollutant or health risk impact during construction after the implementation of Mitigation Measures 5-4A and 5-4B. The less-than-significant health risk assessment determination is further affirmed by the quantitative construction HRA prepared for the Project. The less-than-significant construction impacts associated with the Greystar Project do not require further mitigation.
Mitigation Measures 5-3B and 5-5 were identified to address programmatic impacts associated with future development that could occur within the Freedom Circle Focus Area Plan. Mitigation Measures 5-3B and 5-5 require the preparation of quantitative project-level construction criteria air pollutant and toxic air contaminant emissions analysis for future development proposed under implementation of the Freedom Circle Focus Area Plan. Mitigation Measures 5- 3B and 5-5 specify that if emissions are shown to be above BAAQMD thresholds, the City shall require the implementation of mitigation to reduce emissions below FCFAP and Greystar GPA: Post-Planning Commission EIR Memo Page 12 Air Quality Comments
MIG Memorandum May 12, 2022
BAAQMD thresholds or to the maximum extent feasible. Mitigation Measures 5- 3B and 5-5 identify equipment utilizing alternative fuel sources (e.g., electricpowered and liquefied or compressed natural gas) as a possible means by which to reduce construction emissions.
Incorporation of this mitigation measure is not required for the Greystar Project and would not further reduce the magnitude of Draft EIR Impact 5-3 and Impact 5-5 for the Freedom Circle Focus Area Plan. Further, the recommendations of SCAG RTP/SCS 2020-2045 PMM-AQ-1(n) are already addressed through the mitigation measures contained in the EIR. This additional mitigation measure, as written, has not been incorporated into the EIR as suggested by the commenter.
Response 34:The commenter identifies SCAG RTP/SCS 2020-2045 PMM-AQ-1(o), which includes recommendations that projects develop a traffic plan to minimize traffic flow interference from construction activities.
As discussed under Draft EIR Impact 5-4 and Impact 5-7, the Greystar Project would not result in a significant criteria air pollutant or health risk impact during construction after the implementation of Mitigation Measures 5-4A and 5-4B. The less-than-significant health risk assessment determination is further affirmed by the quantitative construction HRA prepared for the Project. The less-thansignificant construction impacts associated with the Greystar Project do not require further mitigation.
Furthermore, Draft EIR Mitigation Measure 13-1 functions in many aspects as a traffic plan, as suggested by SCAG RTP/SCS 2020-2045 PMM-AQ-1(o). Draft EIR Mitigation Measure 13-1 restricts work hours, contains provisions that public notification be given, and requires construction traffic to follow City Citydesignated truck routes and avoid routes (including local roads in the Plan Area) that contain residential dwelling units to the maximum extent feasible given specific project location and access needs. Other considerations contained in PMM-AQ-1(o), such as use of public transportation or providing satellite parking areas with shuttle service, could be options considered under the implementation of Mitigation Measures 5-3B and 5-5, if needed.
This additional mitigation measure, as written, has not been incorporated into the EIR as suggested by the commenter, because many of the provisions are already required through Mitigation Measure 13-1 and other options identified in PMM-AQ-1(o) could be considered, if needed, for future projects through the implementation of Mitigation Measures 5-3B and 5-5. Further, incorporation of this mitigation measure is not required for the Greystar Project, nor would it reduce the magnitude of Draft EIR Impact 5-3 and Impact 5-5 for the Freedom Circle Focus Area Plan.
Response 35:The commenter identifies SCAG RTP/SCS 2020-2045 PMM-AQ-1(p), which includes recommendations that portable engines and portable engine-driven equipment units used at the project work site, with the exception of on-road and off-road motor vehicles, obtain CARB Portable Equipment Registration with the state or a local district permit.
As discussed under Draft EIR Impact 5-4 (Draft EIR pg. 5-43) and Impact 5-7 (Draft EIR pg. 5-54) the Greystar Project would not result in a significant criteria air pollutant or health risk impact during construction after the implementation of Mitigation Measures 5-4A and 5-4B. The less-than-significant health risk assessment determination is further affirmed by the quantitative construction FCFAP and Greystar GPA: Post-Planning Commission EIR Memo Page 13 Air Quality Comments
MIG Memorandum May 12, 2022
HRA prepared for the Project. The less-than-significant construction impacts associated with the Greystar Project do not require further mitigation.
The commenter has provided no evidence that the incorporation of PMM-AQ-1(p) would reduce the magnitude of Draft EIR Impacts 5-3 and 5-5, nor as the commenter identified what constitutes “appropriate consultations” as provided for in the commenter’s recommended mitigation language. Furthermore, the mitigation language, as proposed by the commenter, could raise enforceability issues, as the City does not have the authority to register equipment under CARB’s Portable Equipment Registration Program (PERP); rather, CARB is the regulatory entity that oversees, implements, and enforces the PERP. Future projects occurring under the implementation of the Freedom Circle Focus Area Plan would be required to comply with Mitigation Measures 5-3B and 5-5, which require the preparation of quantitative project-level construction criteria air pollutant and toxic air contaminant emissions analyses. Mitigation Measures 5- 3B and 5-5 specify that if emissions are shown to be above BAAQMD thresholds, the City shall require the implementation of mitigation to reduce emissions below BAAQMD thresholds or to the maximum extent feasible. Discussions with CARB or the BAAQMD may be undertaken if a future project is unable to reduce its emissions below BAAQMD thresholds, but requiring consultations in and of themselves does not guarantee emissions reductions or a reduction in magnitude of Draft EIR Impact 5-3 and 5-5.
Incorporation of this mitigation measure is not required for the Greystar Project and would not further reduce the magnitude of Draft EIR Impact 5-3 and Impact 5-5 for the Freedom Circle Focus Area Plan. This additional mitigation measure, as written, has not been incorporated into the EIR as suggested by the commenter.
Response 36:The commenter identifies SCAG RTP/SCS 2020-2045 PMM-AQ-1(q), which includes recommendations that projects within 500 feet of residences, hospitals, or schools use Tier IV equipment for all engines greater than 50 horsepower unless the individual project can demonstrate that Tier IV engines would not be required to mitigate emissions below significance thresholds.
As discussed under Draft EIR Impact 5-4 (Draft EIR pg. 5-43) and Impact 5-7 (Draft EIR pg. 5-54) the Greystar Project would not result in a significant criteria air pollutant or health risk impact during construction after the implementation of Mitigation Measures 5-4A and 5-4B. The less-than-significant health risk assessment determination is further affirmed by the quantitative construction HRA prepared for the Project. The less-than-significant construction impacts associated with the Greystar Project do not require further mitigation.
Mitigation Measures 5-3B and 5-5 were identified to address programmatic impacts associated with future development that could occur within the Freedom Circle Focus Area Plan. Mitigation Measures 5-3B and 5-5 require the preparation of quantitative project-level construction criteria air pollutant and toxic air contaminant emissions analysis for future development proposed under implementation of the Freedom Circle Focus Area Plan. Mitigation Measures 5- 3B and 5-5 specify that if emissions are shown to be above BAAQMD thresholds, the City shall require the implementation of mitigation to reduce emissions below BAAQMD thresholds or to the maximum extent feasible. The implementation of recommended PMM-AQ-1(q) would have no different effect in practice as Draft EIR Mitigation Measures 5-3B and 5-5.
FCFAP and Greystar GPA: Post-Planning Commission EIR Memo Page 14 Air Quality Comments
MIG Memorandum May 12, 2022
Incorporation of this mitigation measure is not required for the Greystar Project and would not further reduce the magnitude of Draft EIR Impact 5-3 and Impact 5-5 for the Freedom Circle Focus Area Plan. This additional mitigation measure, as written, has not been incorporated into the EIR as suggested by the commenter.
Response 37:The commenter identifies SCAG RTP/SCS 2020-2045 PMM-AQ-1(t), which includes recommendations that projects should provide information about air quality related programs to schools, including the EJCP, CARE, and Why Air Quality Matters programs.
As described under Section 5.1.4.1 of the Draft EIR, “the Plan Area is not located in a disadvantaged community (as designated by SB 535 or the BAAQMD Community Air Risk Evaluation (CARE) program), nor is it exposed to high amounts of pollution” (Draft EIR pg. 5-11). Furthermore, there are no schools in proximity of the Plan Area that serve a younger student population, and the mitigation language proposed would not reduce any emissions from the Project.
The nearest school is Mission College, which provides educational opportunities for older teenagers and adults. The OEHHA health risk assessment methodology contains age sensitivity factors that take into account the increased sensitivity to carcinogens during early-life exposure. These age sensitivity factors provide a higher weighting of risks for younger members of the population (e.g., infants, children, pre-teens, and younger teens) than those of younger and older adults.
Sensitive receptors – as they relate to schools – to are for facilities that provide educational services for children and young adults (e.g., elementary, middle, and high schools). Facilities that provide educational opportunities for adults (e.g., colleges) are typically not considered sensitive receptors, particularly for construction health risk assessments. Thus, increased consideration of potential risks for students at Mission College would not be given, since it provides educational opportunities to older members of the public. It should be further noted that student receptors at colleges are transient, meaning that they move throughout the campus throughout the day while attending classes and would not be exposed to the same pollutant concentrations throughout the day and year.
The Project would not result in any potentially significant health risk impacts to students, including the college students at Mission College. Thus, the lack of a significant health risk impact at a school eliminates the need for any mitigation, such as the proposed information to the schools.
This additional mitigation measure, as written, has not been incorporated into the EIR as suggested by the commenter. It is not applicable to the Project’s setting, nor would it reduce the magnitude of any air quality impacts associated with the Project.
Response 38:The commenter identifies SCAG RTP/SCS 2020-2045 PMM-AQ-1(u), which includes recommendations that projects work with local cities and communities to install signage that prohibits truck idling in certain locations (e.g., near schools and sensitive receptors). The Freedom Circle Focus Area Plan and Greystar Project propose primarily residential and office land uses, which do not generate substantial number of trucks trips like other land uses, such as industrial and warehousing operations. The majority of truck trips associated with future activities within the Freedom Circle Focus Area Plan would be related to construction, which is temporary (and, as noted below, impacts would be less than significant). Therefore, it is not logical that project applicants would work with the City to install temporary signage.
FCFAP and Greystar GPA: Post-Planning Commission EIR Memo Page 15 Air Quality Comments
MIG Memorandum May 12, 2022
As discussed under Draft EIR Impact 5-4 (Draft EIR pg. 5-43) and Impact 5-7 (Draft EIR pg. 5-54) the Greystar Project would not result in a significant criteria air pollutant or health risk impact during construction after the implementation of Mitigation Measures 5-4A and 5-4B. The less-than-significant health risk assessment determination is further affirmed by the quantitative construction HRA prepared for the Project. The less-than-significant construction impacts associated with the Greystar Project do not require further mitigation.
Mitigation Measures 5-3B and 5-5 were identified to address programmatic impacts associated with future development that could occur within the Freedom Circle Focus Area Plan. Mitigation Measures 5-3B and 5-5 require the preparation of quantitative project-level construction criteria air pollutant and toxic air contaminant emissions analysis for future development proposed under implementation of the Freedom Circle Focus Area Plan. Mitigation Measures 5- 3B and 5-5 specify that if emissions are shown to be above BAAQMD thresholds, the City shall require the implementation of mitigation to reduce emissions below BAAQMD thresholds or to the maximum extent feasible. Requirements on idling and idling times could be incorporated as requirements for projects through the implementation of Mitigation Measures 5-3B and 5-5, if necessary. These requirements could include installing signage.
This additional mitigation measure, as written, has not been incorporated into the EIR as suggested by the commenter. The Project does not propose land uses that would generate trip trick in the quantities that would result in significant health risks, is not located in proximity of any Elementary / Middle Schools, and potential impacts associated with truck operation would be addressed through the implementation of Mitigation Measures 5-3B and 5-5. Incorporating SCAG RTP/SCS 2020-2045 PMM-AQ-1(u) as a standalone mitigation measure for the Project’s EIR would not further reduce the magnitude of Draft EIR Impacts 5-3 and 5-5.
Response 39:The commenter identifies SCAG RTP/SCS 2020-2045 PMM-AQ-1(y), which includes recommendations that projects locating sensitive receptors within 500 feet of freeways and other sources install high efficiency enhanced filtration units.
This comment relates to the environment’s impact on a project, rather than the project’s impact on the environment.
The California Supreme Court decision (December 2015) in California Building Industry Association v. Bay Area Air Quality Management District (“CBIA v.
BAAQMD”) concluded, “[W]e hold that CEQA does not generally require an agency to consider the effects of existing environmental conditions on a proposed project’s future users or residents. What CEQA does mandate…is an analysis of how a project might exacerbate existing environmental hazards.” Thus, per the Court’s ruling in CBIA v. BAAQMD, the City is not required to incorporate PMM-AQ-1(y) as recommended by the commenter.
Future projects developed within the Freedom Circle Focus Area Plan would be required to demonstrate consistency with the City’s General Plan, which currently includes Policy 5.10.5-P34. General Plan Policy 5.10.5-P34 requires, “projects to implement minimum setbacks of 500 feet from roadways with average daily trips of 100,000 or more and 100 feet from railroad tracks for new residential or other uses with sensitive receptors, unless a project‐specific study identifies measures, such as site design, tiered landscaping, air filtration systems, and window design, FCFAP and Greystar GPA: Post-Planning Commission EIR Memo Page 16 Air Quality Comments
MIG Memorandum May 12, 2022
to reduce exposure, demonstrating that the potential risks can be reduced to acceptable levels” (Draft EIR pg. 5-55).
SCAG RTP/SCS 2020-2045 PMM-AQ-1(y) is not required for projects to comply with CEQA or General Plan Policy 5.10.5-P34 and therefore has not been incorporated as mitigation into the EIR.
Response 40:The commenter identifies SCAG RTP/SCS 2020-2045 PMM-AQ-1(z), which recommends a monitoring and maintenance program for MERV filters (presumably those discussed in SCAG RTP/SCS 2020-2045 PMM-AQ-1(y)). See Response 39.
Response 41:The commenter identifies SCAG RTP/SCS 2020-2045 PMM-AQ-1(bb), which sets forth recommendations for equipment using diesel equipment. See Response 36.
Response 42:The commenter identifies SCAG RTP/SCS 2020-2045 PMM-AQ-1(cc), which recommends various measures to increase energy efficiency, including:
improving pedestrian networks, implementing street design features to reduce traffic (e.g., traffic calming measures), creating urban non-motorized zones (including parks and public spaces), dedicating land for bike trails, limiting parking / require parking permits, and providing ride-sharing programs.
As described on Draft EIR pg. 1-2, “Pursuant to section 15150 (Incorporation By Reference) of the CEQA Guidelines, the Freedom Circle Focus Area Plan is incorporated into this Draft EIR by reference.” The Freedom Circle Focus Area Plan contains numerous goals and policies related to pedestrian and bicycle improvements, roadway design criteria to help reduce vehicle trips, and increasing transit ridership. See FC-G4, FC-G6, FC-P4 through FC-P6, FC-P7, FC-P10 through FC-P12, FC-P14, FC-P16, FC-P18 through FC-P24. The Draft EIR also includes Mitigation Measures 5-3D and 9-1A, which set forth requirements that new projects develop TDM Programs that achieve minimum reduction in vehicle miles traveled (VMT) of 20 percent compared to baseline conditions. Such TDM measures could include limiting parking supply, requiring residential area parking permits, and/or providing ride-sharing programs.
This additional mitigation measure, as written, has not been incorporated into the EIR as suggested by the commenter. The commenter has not provided any evidence that SCAG RTP/SCS 2020-2045 PMM-AQ-1(cc) would substantially lessen the magnitude of any significant impacts identified in the EIR. (See San Franciscans for Reasonable Growth v. City and County of San Francisco (1989) 209 Cal.App.3d 1502, 1519; Public Resource Code, § 21002; State CEQA Guidelines, § 15021, subd. (a)(2).) The street design criteria and improvements to pedestrian and bicycle infrastructure are included in the Focus Area Plan’s framework, and other measures related to parking supply, parking permits, and ride-sharing programs are addressed through Draft EIR Mitigation Measures 5- 3D and 9-1A.
Response 43:See Responses 32 through 42. The SCAG RTP/SCS 2020-2045 mitigation measures recommended by the commenter are either included or incorporated through existing mitigation identified in the EIR, are covered under the framework of the Freedom Circle Focus Area Plan, would not substantially lessen the magnitude of any significant impacts, or are not applicable to the Project at all.
The EIR has not incorporated any of the mitigation measures recommended by the commenter. The mitigation measures identified in the EIR fully, accurately, FCFAP and Greystar GPA: Post-Planning Commission EIR Memo Page 17 Air Quality Comments
MIG Memorandum May 12, 2022
and appropriately address potential impacts, and mitigate them consistent with CEQA requirements.
Response 44:Comment noted.
General Plan Consistency Response
The 2035 General Plan includes three Future Focus Areas. All the requirements set forth in the General Plan relating to Future Focus Areas concerns these three existing Future Focus Areas.
For these three existing Future Focus Areas, the General Plan includes discussion and policies concerning the development of comprehensive planning for these areas. In adopting policies relating to these three Future Focus Areas as part of the existing General Plan, the City exercised its discretion to prohibit any specific project from moving forward within these three Future Focus Areas until after comprehensive planning was completed.
Freedom Circle is not one of the three existing Future Focus Areas included in the General Plan. The General Plan does not state that, should the City exercise its discretion to create Additional Future Focus Areas, those Additional Future Focus Areas must be made subject to all the same requirements as the three Future Focus Areas included in current General Plan.
Therefore, in proposing to identify Freedom Circle as an Additional Future Focus Area, the City has the discretion to create new policies relating to it and other Additional Future Focus Areas that may be proposed by the City in the future.
As explained in the EIR, the City has proposed adding Policy 5.4.7-P11 to the General Plan, which allows for the creation of Additional Future Focus Areas and also allows the City to exercise its discretion to allow for General Plan and Zoning amendments to proceed at that the same time as an Additional Focus Area is created. For example, the City may choose to exercise its discretion to allow for General Plan and Zoning amendments to proceed concurrently for an Additional Focus Area, where a Future Focus Area is made up of numerous property owners and only a subset of those property owners is prepared to move forward to specific project applications as was the case with Freedom Circle and Greystar. In such circumstances, the City may determine that delaying an application for a specific development project is not appropriate for one or more reasons such as, for example, where due to the location or use proposed by an applicant the City believes the use can move forward concurrently with the comprehensive planning without negatively impacting the ability to comprehensively plan the Additional Future Focus Area or where the City determines the use, if developed, should be developed in the near term. For Greystar, as demonstrated in the EIR, the Project can be implemented without negatively impacting comprehensive planning of the entire Additional Future Focus Area. Moreover, the Greystar Project proposes over 1,000 new homes. Given the local need and state objective to produce more housing, City staff believes the uses proposed in Greystar further supports the City Council exercising its discretion to allow the project to move forward concurrently with comprehensive planning of this Additional Future Focus Area.
City Staff, however, acknowledges that minor clarifications to the proposed General Plan Amendments may help to avoid confusion concerning the differences between existing Future Focus Areas and Additional Future Focus Areas such as Freedom Circle. Therefore, City Staff proposes the following clarifications to the proposed General Plan Amendments:
Text under section 5.4.7, Future Focus Areas Goals and Policies:
“In addition to the three Future Focus Areas identified in the General Plan as adopted on November 16, 2010, Aadditional Future Focus Areas may be added to the General Plan Land Use diagram through the General Plan Amendment process. Subject to the discretion provided pursuant to Policy 5.4.7-P11, tThe creation of an Additional FCFAP and Greystar GPA: Post-Planning Commission EIR Memo Page 18 Air Quality Comments
MIG Memorandum May 12, 2022
Future Focus Area is a precursor to the comprehensive planning process required for all Focus Areas.”
Policy 5.4.7-P11:
Allow for General Plan Amendments and rezonings outside of existing Future Focus Areas in combination with the designation of new Additional Future Focus Areas.
Biology Response
MIG prepared a memorandum in addition to this one that provides an updated biological setting for the Greystar Project parcels, based on a site visit conducted in April 2022 (MIG 2022). See that memorandum for additional details regarding comments related to biological resources. The Smallwood letter repeats numerous arguments addressed in the Final EIR, and many of the arguments are based on Smallwood’s claim that the biological site visit is too old or otherwise inaccurate. While CEQA’s baseline is generally when the NOP was issued, an additional site visit was nevertheless completed in order to confirm whether conditions have substantially changed in a way that could impact the environmental conclusions in the EIR. As explained in the updated biological setting memorandum, the site visit confirms the conclusions reached in the EIR.
References
The following references were used to prepare this memorandum:
California Air Pollution Control Officers Association (CAPCOA). 2021. Handbook for Analyzing Greenhouse Gas Emission Reductions, Assessing Climate Vulnerabilities, and Advancing Health and Equity. December 2021. Available online:
https://www.airquality.org/ClimateChange/Documents/Final%20Handbook_AB434.pdf City of Santa Clara. 2010. 2010-2035 General Plan. Adopted November 16, 2010. Available online:
https://www.santaclaraca.gov/home/showpublisheddocument/56139/636619791319700 000
______. 2011. Integrated Final Environmental Impact Report for the City of Santa Clara 2010- 2035 General Plan. January 2011. Available online:
https://www.santaclaraca.gov/home/showpublisheddocument/12900/635713044859030 000
______. 2013. City of Santa Clara Climate Action Plan. Adopted December 3, 2013. Available online:
https://www.santaclaraca.gov/home/showpublisheddocument/10170/635713044859030 000
______. 2021. Environmental Impact Report for Freedom Circle Focus Area and Greystar General Plan Amendment. SCH# 2020060425. November 2021.
MIG, Inc. (MIG). 2022. Memorandum. Re: Updated Biological Setting for the Greystar Parcels in the Freedom Circle Focus Area Plan. From Tay Peterson, MIG, to John Davidson, City of Santa Clara. May 11, 2022.
## PG / CD
FCFAP and Greystar GPA: Post-Planning Commission EIR Memo Attachment A Air Quality Comments
MIG Memorandum May 12, 2022
Attachment A
Adams Broadwell Joseph & Cardozo April 13, 2022, Planning Commission Letter FCFAP and Greystar GPA: Post-Planning Commission EIR Memo Attachment A Air Quality Comments
MIG Memorandum May 12, 2022
This page intentionally left blank.
3826-007acp
KEVIN T. CARMICHAEL
CHRISTINA M. CARO
THOMAS A. ENSLOW
KELILAH D. FEDERMAN
ANDREW J. GRAF
TANYA A. GULESSERIAN
KENDRA D. HARTMANN*
DARIEN K. KEY
RACHAEL E. KOSS
AIDAN P. MARSHALL
TARA C. RENGIFO
MICHAEL R. SEVILLE
Of Counsel
MARC D. JOSEPH
DANIEL L. CARDOZO
*Not admitted in California.
Licensed in Colorado.
SACRAMENTO OFFICE
520 CAPITOL MALL, SUITE 350
SACRAMENTO, CA 95814-4721
TEL: (916) 444-6201
FAX: (916) 444-6209
ADAMS BROADWELL JOSEPH & CARDOZO A PROFESSIONAL CORPORATION
ATTORNEYS AT LAW
601 GATEWAY BOULEVARD, SUITE 1000
SOU TH SAN FRANCISCO, CA 94080-7037
___________
TEL: (650) 589-1660
FAX: (650) 589-5062
[email protected]
printed on recycled paper
April 13, 2022
Via Email Submission
Santa Clara Planning Commission
1500 Warburton Ave.
Santa Clara, CA 95050
[email protected]
John Davidson
Principal Planner
Email: [email protected]
Andrew Crabtree
Director, Planning & Inspection Dept.
Email: [email protected]
Re: Agenda Item 4 (22-259): Comments on the Freedom Circle Focus Area and Greystar General Plan Amendment Project
Honorable Members of the Planning Commission:
We write on behalf of Silicon Valley Residents for Responsible Development (“Silicon Valley Residents”) to provide comments on Freedom Circle Focus Area and Greystar General Plan Amendment Project (“Project”), which appears as Item 4 (22- 259) on the Agenda for the April 13, 2022 Santa Clara Planning Commission meeting. The Planning Commission will consider whether to adopt resolutions recommending (1) approval of an Environmental Impact Report (“EIR”) and an associated Mitigation Monitoring and Reporting Program (“MMRP”); (2) adoption of General Plan amendments; and (3) rezoning for the Greystar site (collectively, “approvals”).
The Freedom Circle Focus Area would allow, subject to a future planning study, 2,500 dwelling units beyond those anticipated in the Greystar General Plan Amendment, and an additional 2 million square feet of additional office space. The Focus Area is 108 gross acres bounded by San Tomas Aquino Creek to the east, Great America Parkway to the west, Great America Theme Park to the north and Highway 101 to the south.
Post Meeting Material
Planning Commission
Meeting
April 13, 2022
Item 4
April 13, 2022