Following interviews and presentations, Phase 2 scores were tabulated as shown in Table 2.

Table 2
Evaluation Criteria - Phase Two Aramark Pritchard ABM C&W Interview and Presentations 34.00 36.00 36.00 34.00
(40 points)
Cost (60 points) 51.00 43.20 49.80 39.00
Total 85.00 79.20 85.80 73.00
The Notice of Intended Award was published on February 24, 2025 recommending for award of contract to ABM Industry Groups, LLC based on the total combined scores from Phase One and Phase Two {Table 3):

Table 3
Total Combined Phase One and 168.30 169.20 176.90 162.00 Phase Two Score
B. Discussion - Response to C&W's Protest
Correction of Clerical Error in the Notice of Intended Award (NOIA) On March 3, 2025, C&W submitted via email a bid protest letter raising concerns regarding inconsistencies in the RFP evaluation criteria and NOIA.

After review, I can confirm that the NOIA contained a clerical error in the description of one evaluation criteria. Specifically, the document incorrectly listed "Methodology to Provide Required Services (30 points)" instead of the correct criterion, "Cost (60 points) ." However, this was a clerical error in the NOIA only and did not impact the actual scoring, evaluation, or award determination.

To further clarify, the actual scores assigned for this Cost criterion were: 51.00 (Aramark), 43.20 (Pritchard), 49.80 (ABM), and 39.00 (C&W). These scores align with a 60-point scale, not a 30- point scale. This confirms that the evaluation committee applied the correct weight during scoring, and that all tabulations, calculations, and final scores remain accurate and in accordance with the evaluation criteria published in the RFP. My review confirms that this clerical error did not impact the fairness, integrity, or outcome of the process.

Section 23.1.6 of the RFP states that the Stadium Manager reserves the right to remedy errors in the RFP process. Accordingly, a corrected Notice of Intended of Award was published on March 7, 2025 by Stadium Manager noting the clerical error, and we thank you for bringing it to our attention .

Charlotte Jensen, C&W Services, Inc.

Re: Protest letter from C&W Services, Inc. dated March 3, 2025APPROVAL OF STADIUM

MANAGER'S REQUEST TO
March 11, 2025

Page 3 ends

Regarding Delays and Communication
I acknowledge your concerns regarding communication throughout the RFP process. However, a review of the correspondence between C&W and Stadium Manager demonstrates that regular engagement occurred at key stages of the RFP. While I understand the desire for additional updates, it is important to note that the procurement timelines must balance transparency with the confidentiality required during the evaluation phase. The Stadium Manager remained engaged throughout the process and provided responses when feasible, ensuring that C&W received key information as the evaluation progressed .

C. Conclusion
Given that the clerical error in the NOIA was limited to wording and did not impact the actual evaluation or scoring, that the correct Cost criterion (60 points) was applied during the evaluation process , and that the final award recommendation remains based on accurate scoring, I am upholding the recommendation of award to ABM as stated in the NOIA I find that all parties acted in good faith, that denial of the protest (and upholding the Notice of Intended Award) would not undermine the intent and purpose of the Stadium Authority's procurement policies, and that the clerical error that forms the basis for the protest did not prevent substantial compliance with the Stadium Authority's procurement policies.

In accordance with the procedures outlined under Santa Clara City Code Chapter 17.30.140 (Bid Contest Procedures), you have seven days after receipt of this letter to appeal this decision and request a hearing with the Stadium Authority Board.

We appreciate the time and effort C&W had invested in this RFP and value your interest and participation in this process.

Sincerely,
r;;)y
J~ .G~oga
Executive Director
City of Santa Clara
Agenda Report
1500 Warburton Avenue
Santa Clara, CA 95050
santaclaraca.gov
@SantaClaraCity
25-166 Agenda Date: 3/25/2025

REPORT TO COUNCIL

SUBJECT
Public Hearing: Actions to Allow the Development of 1,792 Residential Units and Associated On- and Off-Site Improvements on Property Located at 2518 Mission College Boulevard, including an Addendum to the Freedom Circle Future Focus Area Plan Environmental Impact Report and Mitigation Monitoring and Reporting Program, General Plan Amendment, Rezone, and a Vesting Tentative Subdivision Map

COUNCIL PILLAR
Promote and Enhance Economic, Housing and Transportation Development

BACKGROUND
On April 22, 2024, Irvine Company (applicant) filed an application (File Nos. PLN24-00160 and PLN24-00213) for the subject proposal to redevelop the 25.74-acre parcel (APN:104-40-019) as a residential apartment community “project”, with 1,792 residential units in five, five-story buildings, approximately 3,500 square feet of retail and 4.225 acres of public park land and associated on- and off-site improvements.

The project site is located south of Mission College Boulevard, encircled by Freedom Circle on the east, west and south boundaries, and has nearby access from Bowers Avenue and Great America Parkway exit on US Route 101. It is near Great America Theme Park, Santa Clara Convention Center and Levi’s Stadium to the north and Santa Clara Square, an Irvine horizontal mixed-use development to the south. The site is currently developed with a business park containing 12 two- story partially vacant commercial buildings with surface parking and landscaping. The project site currently has a General Plan land use designation of Very High Density Residential (VHDR) within the Freedom Circle Future Focus Area and is zoned HO-RD (High-Intensity Office/Research and Development (R&D)). See Attachment 14 for a vicinity map.

The Freedom Circle Future Focus Area comprises 108 acres and is bounded by San Tomas Aquino Creek to the east, Great America Parkway to the west, Great America Theme Park to the north, and US Route 101 to the south (“Area”). On June 7, 2022, the City Council approved the Freedom Circle Future Focus Area Plan to include 3,600 residential units. The Area still intends to preserve a significant amount of commercial and office uses and would add approximately two million square feet of new office space.

Council action on June 7, 2022 also included approval of the 13.3-acre Greystar residential project within the Area, which is bounded by San Tomas Aquino Creek to the East, Freedom Circle to the West, and US 101 freeway to the south (the “Greystar Site”). This approval allowed for a total of 1,075 dwelling units in three, seven-story buildings, a 2,000 square feet of retail space, and a two- acre public park with a connection to the San Tomas Aquino Creek trail.

City of Santa Clara Printed on 3/21/2025Page 1 of 5
powered by Legistar™
25-166 Agenda Date: 3/25/2025
To implement the project, a General Plan Text Amendment (adding a new policy), Rezone to Planned Development (PD), a Tentative Subdivision Map, and Architectural Review are necessary. The General Plan Amendment and Rezoning applications require approval by the City Council after the Planning Commission has reviewed and provided a recommendation (Chapter 18.142, 2024 Zoning Code). Tentative Map Applications require Council approval after the Planning Commission has reviewed and provided a recommendation (Chapter 17.05 of the City Code). Architectural Review will be evaluated after the other applications are resolved through the Development Review Hearing process.

At a publicly noticed meeting on February 19, 2025, the Planning Commission reviewed the project to construct 1,792 residential units and associated on- and off-site improvements and provided a unanimous recommendation of approval to the City Council.

DISCUSSION
At the February 19, 2025, Planning Commission meeting, staff presented an analysis of the project’s conformance with the Freedom Circle Future Focus Area Plan, General Plan, Zoning Code and the Subdivision Code. The Planning Commission Staff report with detailed analysis of the project is included as Attachment 1. Project plans are included as Attachments 12 and 13. During the meeting, the Commission had questions regarding:
· The use of cobblestones for paving
· garage security
· providing a higher level of affordable units
· electric vehicle and bicycle charging
· use of solar panels, architectural style of the project, and · the construction timeline for the project.

In response to these questions, the applicant team shared that they plan to use pavers instead of cobblestone that was used at their Santa Clara Square project because of its durability. The garages at the proposed project would have 24/7 patrol service and cameras for added security. Regarding affordability, the applicant team shared that in addition to providing five percent units at 50% Area Median Income (AMI) and ten percent units at 100% AMI, the project provides “affordability by size” by providing 70% of the units at an average of 667 square foot per unit that may be more attractive to teachers, students, and tech workers. Additionally, the affordable units will be evenly distributed throughout the five buildings. The Commission recommended the applicant use some fast chargers in the project for vehicle charging. The Commission asked if the solar panels could be on rooftop and recommended the adjustment of solar power to use it both for hot water and heating to reduce the equipment cost. The applicant responded that all the solar panels are on upper level of the parking garage. The Commission asked the applicant how they would provide a variation to the overall Mission style architecture into the project. The applicant clarified that they are working on providing distinction in style from their other projects and providing a distinction in each of the four architectural styles: Palladian, Formal Spanish, Italian and Modern Palazzo. In their response, the applicant noted that it was a balancing act providing for their customer base demand and building a unique project.

Prior to the Planning Commission Meeting, staff received a total of 30 public comments, including comments from:

City of Santa Clara Printed on 3/21/2025Page 2 of 5
powered by Legistar™
25-166 Agenda Date: 3/25/2025
· Catalyze SV
· Housing Action Coalition
· Silicon Valley Bicycle Coalition, and
· The Sierra Club
Of these commenters, approximately half were from Santa Clara residents. All except one comment were in support of the project. Some comments included the recommendations for the project to include more density, more affordable units, lighting improvements on the trail, more retail and restaurants, clear timelines for completion of trails and roads, providing robust transit passes, bikeshare, e-bike charging, developer owned parks/facilities to include active amenities like tot lots, water bottle refill stations, cautioning against use of artificial turf in the project, and using bird-safe glass and native plantings.

At the Planning Commission Hearing, 14 members of the public spoke on the project. Of those, 11 members of the public spoke in strong support of the project, and two members were representing local unions emphasized the importance of using the skilled local labor. Commentators noted the Irvine Company does quality development and their other developments in the City are mostly occupied, the project provides much needed housing and affordable units, and provides plenty of amenities and sustainability features on site. The concerns from commenters included providing unbundled parking, robust Vehicle Miles Reduction (VMT) strategies, making e-bike charging available in the bike parking area, lighting improvements on trails, and providing more retail in the project. The applicant responded that adequate e-charging will be available in garages, and that the parking will be unbundled. Also, the retail provided by the project will be maintained and run by Irvine Company and that from their perspective proposed 3,500 square foot retail is adequate and sustainable. In response to the lighting improvements on San Tomas Aquino Creek trail, the applicant noted that the trail is managed by the City and Valley Water. While they could light up the trail heads, additional lighting would interrupt the biological environment around the trail.

At the end of the discussion, the Planning Commission unanimously recommended approval of the project to the City Council, adding a condition (Condition # P10 of the Rezoning) for the Applicant to explore opportunities to work with the local construction labor unions.

After further discussions with the Parks division to have dedicated parkland instead of public easements, the Vesting Tentative Map has been updated to subdivide the subject parcel into five residential parcels and three park parcels. This revision has been reviewed and cleared by the City’s Subdivision Committee.

ENVIRONMENTAL REVIEW
An Addendum to the Freedom Circle Future Focus Area Plan Environmental Impact Report (EIR) (2022) was prepared for the project by the environmental consultant firm MIG, Inc, in accordance with the California Environmental Quality Act (CEQA) and was posted on the City’s website (weblink provided in Attachment 4). The Addendum concluded that the proposed project would not cause substantial changes to the previously approved EIR. This Addendum includes four refinements to 2022 EIR mitigation measures which provide clarification and detailed protocols for project-specific implementation of the 2022 EIR mitigation measures: one in Air Quality, two in Biological Resources, and one in Cultural Resources. No further evaluation is required, and no Subsequent or Supplemental EIR is needed pursuant to State CEQA Guidelines Section 15162, and an EIR Addendum has therefore appropriately been prepared, pursuant to Section 15164. Pursuant to CEQA City of Santa Clara Printed on 3/21/2025Page 3 of 5
powered by Legistar™
25-166 Agenda Date: 3/25/2025
Guidelines Section 15164(c), this Addendum will not be circulated for public review but will be included in the public record file for the project approval.

FISCAL IMPACT
There is no fiscal impact to the City for processing the requested application other than administrative time and expense typically covered by processing fees paid by the applicant. To comply with the General Plan policy 5.1.1-P8, a fiscal evaluation of the project was prepared for the project. It concluded the project is expected to result in a positive net fiscal impact on the City’s General Fund at buildout and on the Santa Clara Unified School District’s (SCUSD) operating budget.

COORDINATION
This report has been coordinated with the City Attorney’s Office, Parks and Recreation Department and Public Works Department.

PUBLIC CONTACT
On February 5, 2025, a hearing notice was published in the Santa Clara Weekly and on February 13, 2025, a notice was published in the San Jose Mercury News. On February 6 and February 13, 2025, a notice of public hearing for this item was mailed to property owners within 1,000 feet of the project side boundaries and interested parties. Staff has received several public comments on the project including from Catalyze SV, the Housing Action Coalition, and the Silicon Valley Bicycle Coalition and they are available as Attachment 1.

Community Meetings
Consistent with the City’s Public Outreach Policy for Planning Applications, public outreach meetings were conducted by the Property Owner/Applicant on May 13, 2024 (hybrid) and on October 16, 2024 (in-person), to engage the neighborhood community in the planning process. Notices of the meetings were mailed by the Property Owner/Applicant to properties within 1,000 feet of the project site boundaries and recording and meeting minutes were posted on the City’s website. These meetings provided the community opportunities to review and comment on the proposal. Key topics at these meetings included land use and density, affordability, Transportation and Parking, preserving onsite trees, bike and pedestrian connectivity and environmentally sustainable features.

ALTERNATIVES

1. Adopt a resolution adopting the Addendum to the Freedom Circle Future Focus Area Plan Environmental Impact Report (EIR) (2022), and the Mitigation Monitoring and Reporting Program for Santa Clara Park Residential Project at 2518 Mission College Boulevard.

2. Adopt a resolution approving the General Plan text amendment to add a new policy to the Freedom Circle Focus Area to clarify that a Planned Development rezone satisfies the requirement of a comprehensive plan for the project at 2518 Mission College Boulevard.

3. Adopt a resolution approving a rezoning of the project site from High Intensity Office and R & D (HO-RD) to Planned Development (PD) to allow construction of residential development consisting of 1,792 units, 3,500 square feet retails, 4.225 acres of public parks, landscaping, and on- and off-site improvements at 2518 Mission College Boulevard, subject to conditions of approval.

4. Adopt a resolution approving a Vesting Tentative Subdivision Map to subdivide the land into six individual lots to serve the proposed development at 2518 Mission College Boulevard, subject to conditions of approval.

5. Deny the General Plan text amendment to add a new policy to the Freedom Circle Focus Area City of Santa Clara Printed on 3/21/2025Page 4 of 5
powered by Legistar™
25-166 Agenda Date: 3/25/2025
that would have clarified that a Planned Development rezone satisfies the requirement of a comprehensive plan for the project at 2518 Mission College Boulevard.

6. Deny the rezoning of the project site from High Intensity Office and R & D (HO-RD) to Planned Development (PD) to allow construction of residential development consisting of 1,792 units, 3,500 square feet retails, 4.225 acres of public parks, landscaping, and on- and off-site improvements at 2518 Mission College Boulevard.

7. Deny the Vesting Tentative Subdivision Map to subdivide the land into six individual lots to serve the proposed development at 2518 Mission College Boulevard.

RECOMMENDATION
Alternatives: 1, 2, 3 and 4

1. Adopt a resolution adopting the Addendum to the Freedom Circle Future Focus Area Plan Environmental Impact Report (EIR) (2022), and the Mitigation Monitoring and Reporting Program for Santa Clara Park Residential Project at 2518 Mission College Boulevard.

2. Adopt a resolution approving the General Plan text amendment to add a new policy to the Freedom Circle Focus Area to clarify that a Planned Development rezone satisfies the requirement of a comprehensive plan for the project at 2518 Mission College Boulevard.

3. Adopt a resolution approving a rezoning of the project site from High Intensity Office and R & D (HO-RD) to Planned Development (PD) to allow construction of residential development consisting of 1,792 units, 3,500 square feet of retail, 4.225 acres of public parks, landscaping, and on- and off-site improvements at 2518 Mission College Boulevard, subject to conditions of approval.

4. Adopt a resolution approving a Vesting Tentative Subdivision Map to subdivide the land into eight individual lots to serve the proposed development at 2518 Mission College Boulevard, subject to conditions of approval.

Reviewed by: Afshan Hamid, Director, Community Development Department Approved by: Jovan Grogan, City Manager

ATTACHMENTS

1. Planning Commission Staff Report of February 19, 2025

2. Public Comments Received

3. Link to the Addendum to the Freedom Circle Future Focus Area Plan Environmental Impact Report (EIR) (2022)

4. Resolution adopting the Addendum to the Freedom Circle Future Focus Area Plan EIR

5. Resolution Approving the General Plan Amendment

6. Resolution Approving the Rezone

7. Resolution Approving the Vesting Tentative Subdivision Map

8. Conditions of General Plan Amendment and Rezoning Approval

9. Conditions of Tentative Subdivision Map Approval

10. Project Data Table

11. Freedom Circle Future Focus Area Plan Conformance

12. Planned Development Document

13. Link to the Vesting Tentative Subdivision Map

14. Vicinity Map
City of Santa Clara Printed on 3/21/2025Page 5 of 5
powered by Legistar™
City of Santa Clara
Agenda Report
1500 Warburton Avenue
Santa Clara, CA 95050
santaclaraca.gov
@SantaClaraCity
24-1188 Agenda Date: 2/19/2025

REPORT TO PLANNING COMMISSION

SUBJECT
PUBLIC HEARING: Action on an Addendum to the Freedom Circle Future Focus Area Plan Environmental Impact Report and Mitigation Monitoring and Reporting Program, General Plan Amendment, Rezone, and Vesting Tentative Subdivision Map for the Property Located at 2518 Mission College Boulevard to Allow the Development of 1,792 Residential Units and Associated On- and Off-Site Improvements

REPORT IN BRIEF
Applicant /Owner: Irvine Company/ Freedom Circle LLC
General Plan: Very High Density Residential (VHDR)
Zoning: High-Intensity Office/R&D (HO-RD)
Site Area: 25.74 acres
Existing Conditions: The site currently is a business park containing 12 two-story commercial buildings with surface parking and landscaping. The business park was built around 1978 and is currently mostly vacant.

Surrounding Land Uses:
· North: Mission College Boulevard, Office Uses
· South: Freedom Circle, Retail and Office Uses
· East: Freedom Circle, Vacant Parcel (Approved Greystar project for 1,075 residential units) · West: Freedom Circle, Retail and Office uses
Staff Recommendation: The Planning Commission adopt resolutions recommending the City Council adopt the Addendum to the Freedom Circle Future Focus Area Plan Environmental Impact Report (EIR) and Mitigation Monitoring and Reporting Program; and approve the General Plan Amendment, Rezone and Vesting Tentative Subdivision Map for the property located at 2518 Mission College Boulevard to allow the development of 1,792 residential units and associated on- and off-site improvements.

BACKGROUND
On April 22, 2024, Irvine Company (applicant) filed an application (File Nos. PLN24-00160 and PLN24-00213) for the subject proposal to redevelop the 25.74-acre parcel (APN:104-40-019) as a residential apartment community “project”, with 1,792 residential units, approximately 3,500 square feet of retail and 4.225 acres of public parks and associated on- and-offsite improvements.

The subject property currently has a General Plan land use designation of Very High Density Residential (VHDR) within the Freedom Circle Future Focus Plan Area and is zoned HO-RD (High- Intensity Office/Research and Development (R&D)). The subject property is located south of Mission City of Santa Clara Printed on 2/13/2025Page 1 of 11
powered by Legistar™
24-1188 Agenda Date: 2/19/2025
College Boulevard, encircled by Freedom Circle on the east, west and south boundaries, and has nearby access from Bowers Avenue and Great America Parkway exit on US Route 101. It is near Great America Theme Park, Santa Clara Convention Center and Levi’s Stadium to the north and Santa Clara Square to the south.

Site History and Previous Actions
The subject site is within the Freedom Circle Future Focus Area. The Plan Area comprises 108 acres bounded by San Tomas Aquino Creek to the east, Great America Parkway to the west, Great America Theme Park to the north, and US Route 101 to the south (“Area”). On June 7, 2022, the City Council approved the Freedom Circle Future Focus Area Plan. Although this employment rich area was long envisioned to be a commercial center, because of the significant redevelopment interest and the City’s interest in projects that would help the City achieve its Regional Housing Needs Assessment (RHNA) goals for housing production, the future focus area was approved to include 3,600 residential units, converting the sites along Freedom Circle to high-intensity residential use.

The Area still intends to preserve a significant amount of commercial use and office uses, and would add approximately two million square feet of new office space.

The Council action of June 7, 2022, also included approval of the 13.3-acre Greystar project within the Area, which is bounded by San Tomas Aquino Creek to the East, Freedom Circle to the West, and US 101 freeway to the south (the “Greystar Site”). This approval included a General Plan Amendment to change the General Plan land use designation for the Greystar Site from High- Intensity Office/R&D (maximum Floor Area Ratio of 2.0) to Very High Density Residential (51-100 Dwelling Units/Acre), and allowed for the a development comprised of a total of 1,075 dwelling units in three, seven-story buildings, a 2,000 square feet of retail space, and a two-acre public park with a connection to the San Tomas Aquino Creek trail.

The Area was added as a Phase III Future Focus Area to the General Plan (Section 5.4.7), and any change in land use designation or rezoning of land within the Freedom Circle area would be subject to the requirements of the Future Focus Area Goals and Policies of the General Plan.

Requested Actions
Implementation of the project requires the following actions by the City Council:

1. General Plan text amendment to add a new policy to the Freedom Circle Future Focus Area to clarify that a Planned Development rezone satisfies the requirement of a comprehensive plan for the project

2. Rezone of the property from HO-RD to Planned Development (PD)

3. Vesting Tentative Subdivision Map to subdivide the property into six lots, and The project also requires approval of Architectural Review. In accordance with Chapter 18.120, Architectural Review is conducted by Staff through a Development Review Hearing process, which is a Departmental hearing open for public comments.

DISCUSSION
The developer proposes to subdivide the parcel into six lots, construct a wrap style (residential building around a multi-level parking structure) five-story building on each of the five lots. The sixth lot City of Santa Clara Printed on 2/13/2025Page 2 of 11
powered by Legistar™
24-1188 Agenda Date: 2/19/2025
will be developed as a 3.48-acre public park, with additional parkland provided as a north-south connection, resulting in a total parkland dedication of 4.225 acres. The proposal includes approximately 3,500 square feet of resident and public-serving retail space, and approximately 13,000 square feet of amenity space. Consistent with the City’s affordable housing ordinance, fifteen percent of the total number of units (or 268.8 units) are required to be provided as affordable housing units. The proposal includes five percent of the units at Very Low income and 10 percent of the units as Moderate income, with an overall affordability level of less than 100 percent Area Median Income (AMI). Redevelopment of the property as proposed includes the demolition of all existing structures and site improvements (surface parking lot and landscaping) and removal and relocation of some trees.

Primary considerations for the project include consistency with the Freedom Circle Future Focus Area Plan, City’s General Plan, and conformance with the City Code requirements for Planned Development Zoning and subdivision.

General Plan Conformance
Two Policies and one Goal of the City’s General Plan require adoption of a future planning document, such as a specific plan, prior to a new development or redevelopment in the Freedom Circle Future Focus Area Plan. These General Plan policies and goal are listed below:
· 5.1.1-P8: Prior to approval of residential development for Phase III in any Future Focus Area, complete a comprehensive plan for each area that specifies:
• Land Uses, with the location of residential, retail, mixed ‐
uses, public facilities, schools
and parks.
• Street System, with the location of neighborhood circulation elements, connections to existing roadways, pedestrian and bicycle amenities, and access to alternate transportation modes.
• Community Design, with appropriate design guidelines for private development, public facilities, streetscapes and transitions to adjacent land uses. • Infrastructure and Utilities, with provisions for sufficient storm drain, sanitary sewer conveyance, wastewater treatment, water, solid waste disposal and energy capacity. • Public Services, with provisions that new development: does not have adverse impacts on libraries; arts, cultural and community facilities; police services; and fire and life safety services; and avoids impacts on schools and requires mitigation consistent with State regulations.
• Fiscal Health, with an evaluation of projected costs and revenues associated with implementation of the Future Focus Area development and its potential effects on the City’s budget.
• Public Participation, with opportunities for community input at each stage of the planning process.
· 5.4.7-P1: Require the adoption of the comprehensive plan prior to any rezoning within that designated Future Focus Area.
· Goal 5.4.7-G1: All applicable prerequisites are met, and a comprehensive plan is adopted, prior to implementation of any Future Focus Area.

Currently, the Freedom Circle Future Focus Area Plan does not provide for development of site through an adopted specific plan. Therefore, the proposed project would require a General Plan text City of Santa Clara Printed on 2/13/2025Page 3 of 11
powered by Legistar™
24-1188 Agenda Date: 2/19/2025
amendment to add a new policy to the Freedom Circle Focus Area Plan to allow the project to proceed under a plan specific to the project site. The following text amendment is proposed to accomplish this purposes:

FC-P25: For the 25.74-acre Santa Clara Park project located at 2518 Mission College Boulevard, a Planned Development Rezoning shall satisfy the comprehensive plan requirements of General Plan Policies 5.1.1-P8 and 5.4.7-P1 and Goal 5.4.7-G1.

Thus, the proposed PD Document (Attachment # 11) would serve as the “future planning document” applicable to the project and would also establish the framework for development, development assumptions, and related performance standards to implement this site-specific development proposal.

The General Plan land use designation for the project site is Very High Density Residential. This designation is intended for residential development at densities ranging from 51 to 100 units per gross acre. This density range is intended to take advantage of proximity to transit, offering an urban feel and typically comprising mid- to high-rise buildings featuring structured or below-grade parking, as well as shared outdoor space. Additionally, retail and other compatible commercial uses that activate the street are permitted on the ground floor. The proposed project is in alignment with the Freedom Circle Future Focus Area Plan.

The proposed project is consistent with the following General Plan Policies:

General Land Use Policies
· 5.3.1-P2: Encourage advance notification and neighborhood meetings to provide an opportunity for early community review of new development proposals. · 5.3.1-P26: Support a community-initiated planning process so that existing neighborhoods can participate in developing more detailed plans for street, landscape and pedestrian facility improvements.

The applicant conducted public outreach through mailings and two community meetings to involve neighboring property owners in the design of the project. Notices were mailed to property owners within 1,000 feet of the project boundaries and interested parties. · 5.3.1
‐
P4 Encourage new development that meets the minimum intensities and densities specified in the land use classifications or as defined through applicable Focus Area, Neighborhood Compatibility or Historic Preservation policies of the General Plan.

The proposed residential project would develop the subject site at a density of 69.6 DU/acre in conformance with the density range specified for the Very High Density Residential land use designation (51-100 DU/acre) in the Freedom Circle Future Focus Area Plan. · 5.3.1-P8: Work with property owners to improve or redevelop underutilized and vacant properties.
· 5.3.1-P9: Require that new development provide adequate public services and facilities, infrastructure, and amenities to serve the new employment or residential growth.

The project would redevelop the subject site currently developed with 12 two-story partially vacant commercial office buildings with 1,792 residential units and public and private on- and off-site City of Santa Clara Printed on 2/13/2025Page 4 of 11
powered by Legistar™
24-1188 Agenda Date: 2/19/2025
improvements, that include private street, utilities, and landscaping. · 5.3.1-P10: Provide opportunities for increased landscaping and trees in the community, including requirements for new development to provide street trees and a minimum 2:1 on- or off-site ratio replacement for trees removed as part of the proposal to help increase the urban forest and minimize the heat island effect.

Landscaping and preserving existing redwood trees, incorporating them into the new site plan is a primary focus of the redevelopment plan. The proposed buildings are articulated with open landscaped courtyards and setbacks allowing for additional trees and ground cover. Mature redwoods along perimeter building edges screen views and lessen the perception of building scale.

The proposed development plan includes landscaping of the site and the project street frontage with a variety of plant and tree species. Of the 417 trees on site, it would replace the 287 trees that are proposed to be removed with 932 new trees, thereby exceeding the minimum replacement ratio of 2:1. In addition, 94 trees would be preserved, and 36 trees would be relocated. · 5.3.1-P12: Encourage convenient pedestrian connections within new and existing developments.
· 5.3.1-P16: Consolidate curb cuts with new development on arterial roadways to minimize pedestrian/vehicle conflicts at driveway locations and improve traffic flow. · 5.3.1
‐
P15 Require new developments and major public infrastructure projects to include adequate rights-of
‐
way to accommodate all modes of transportation.
· 5.3.1
‐
P14 Encourage Transportation Demand Management strategies and the provision of bicycle and pedestrian amenities in all new development greater than 25 housing units or more than 10,000 non
‐
residential square feet, and for City employees, in order to decrease use of the single
‐
occupant automobile and reduce vehicle miles traveled, consistent with the Climate Action Plan.

The project would construct a seven-foot wide sidewalk along the project site perimeter and a Class IV separated bikeway along Mission College Boulevard and Freedom Circle to facilitate pedestrian access and link neighboring land uses. A new 28-foot-wide two-way east/west private street roughly dividing the project site into a northern half and a southern half would be added. It would include bike lanes, six-foot pedestrian sidewalks on both sides, and a landscape parkway in-between the street and sidewalk. The curb cuts along Freedom Circle have been consolidated to open on the new east west private street to minimize the bike/pedestrian and vehicle conflicts. A north/south green pedestrian path connects Mission College Boulevard to the proposed 3.48-acre public park at the southern edge of the project site across the street from the approved two-acre public park on the Greystar project site, leading to the San Tomas Aquino Creek trail. Consistent with the City’s Climate Action Plan (2022), the applicant has provided a draft Transportation Demand Management (TDM) plan demonstrating the vehicle miles travelled (VMT) reduction of 20 percent. · P.3.1-P29: Encourage design of new development to be compatible with, and sensitive to, nearby existing and planned development, consistent with other applicable General Pan policies.

The Freedom Circle loop separates the project site from the retail and office uses on the adjacent parcels. Mature redwood trees along the perimeter screen views and lessen the perception of building scale. The proposed residential buildings are designed in a wrap style concealing the parking structure at the center.

City of Santa Clara Printed on 2/13/2025Page 5 of 11
powered by Legistar™
24-1188 Agenda Date: 2/19/2025
Transition Policies
· 5.5.2-P1: Require that new development incorporate building articulation and architectural features, including front doors, windows, stoops, porches or bay windows along street frontages, to integrate new development into the existing neighborhoods. · 5.5.2
‐
P2 Implement design review guidelines for setback, heights, materials, massing, articulation and other standards to support Transition Policies and promote neighborhood compatibility.

The project incorporates four different architectural styles (Modern Palazzo, Italian, Palladian, and Formal Spanish), offsets along the building planes and a mixture of exterior materials and architectural features to create visual breaks and interest in the design for compatibility with the surrounding neighborhood. Interconnected bike and pedestrian paths connect through various courtyards and green spaces connecting to the public sidewalk fronting the site and neighboring properties.
· 5.5.2-P3: Implement site design solutions, such as landscaping and increased building setbacks, to provide buffers between nonresidential and residential uses. · 5.5.2-P5: Require that new development provide an appropriate transition to surrounding neighborhoods.

The project includes landscaped building setbacks to transition the proposed five story Mediterranean style residential development on the site from adjacent commercial properties. · 5.5.2
‐
P9 Improve pedestrian amenities, including sidewalks and bicycle paths, to promote neighborhood compatibility.

The project would add sidewalks, bike paths, a new east west private street with dedicated bike lanes and sidewalks, and a north south pedestrian path to enhance the connection to the surrounding properties.

Freedom Circle Future Focus Area Plan Conformance
The long-term buildout of the Freedom Circle Future Focus Area will create a dynamic, mixed-use district that includes residential developments and community amenities as well as a diverse range of employment uses. It will complement other North Santa Clara neighborhoods and provide a complete network of pedestrian, bicycle and roadway connections to destinations including employment centers, transit stops, and trails. The Future Focus Area Plan includes goals and policies that guide development within the Freedom Circle Future Focus Area. Figure 1 of the Freedom Circle Future Focus Area Plan illustrates the locations of the various land use designations, proposed open space areas and pedestrian and bicycle connections.

Attachment #10 includes a Freedom Circle Goals & Policy Consistency Statement, provided by the applicant demonstrating consistency with these goals and policies.

Zoning Conformance
The project would rezone the property from HO-RD to PD. The project was deemed cleared by the City’s Project Clearance Committee (PCC) on December 10, 2024, and appropriate Conditions of Approval were added.

City of Santa Clara Printed on 2/13/2025Page 6 of 11
powered by Legistar™
24-1188 Agenda Date: 2/19/2025
Per Chapter 18.20 of the Zoning Code, the PD zone is limited to the properties that are at least 25 acres and are intended to allow for creative design solutions and land uses not otherwise allowed in standard zoning districts while maintaining compatibility with the existing community and allowing for greater community ownership. The proposed PD zoning establishes development standards in the density and site design compatible with existing and approved land uses surrounding the project site.

Affordable Housing
The proposed project is subject to the City’s Affordable Housing Ordinance (Chapter 17.40) and would be required to designate 15 percent of the 1,792 units (or 268.8 units) as affordable housing for households at the following affordability levels: five percent (or 75 units) at 50 percent of AMI and the remaining 193.8 units offered at an average of one hundred percent of AMI. For the fractional unit of 0.8, the applicant has elected to provide an additional affordable unit, for a total of 194 affordable units at average of 100 percent AMI. Affordable units shall be reasonably dispersed throughout the project, and contain the same number of bedrooms as market rate units.

Site Design and Architecture
The project features five five-story residential wrap style buildings including 1,792 apartment units with array of residential amenities and 3,500 square feet of project serving retail located in Building 5.

The project would provide a private central street through the project site to connect the east and west sides of Freedom Circle, with Buildings 1, 2, and 3 north of the road, and Buildings 4 and 5 south of the road.

The project would divide the existing 25.74-acre parcel to create six parcels of varying sizes, which would include one parcel for each of the five proposed residential buildings and one parcel for the public park to be dedicated to the city. Each of the buildings will have studio, one-bedroom and two- bedroom apartment units, and multi-level parking tucked internally, away from the street view. All parcels and buildings are of varying sizes: Building 1 (362 units); Building 2 (341 units); Building 3 (536 units); Building 4 (292 units); and Building 5 (261 units). Dividing the property between north and south is an east-to-west street connection that would accommodate vehicles as well as bicycles and pedestrians. At the center of this connection, a north-to-south pedestrian connection intersects the property between eastern and western portions leading to the future public park. This intersection and approximate center of the project site is envisioned to serve as the focal point and social hub for the development, with the retail, leasing office and amenities located here.

The current architecture is conceptual for the buildings and is an overall Mediterranean style. Formal evaluation of architecture will occur through the Architectural Review process in accordance with Chapter 18.120 of the City Code as the current proposed elevations are being refined.

Staff comments on Architecture
The architecture is at the conceptual level and more details will be required prior to being approved at the Development Review Hearing. Staff is requesting more details and delineation between the various styles of Mediterranean architecture such as:
a. Adding varying details between each building, such as balconies or entrances b. Varying the entry features through distinct design elements c. Further refinement of the material palette and color so it is a more vernacular color palette d. Assigning a single architectural style to each of the buildings.

City of Santa Clara Printed on 2/13/2025Page 7 of 11
powered by Legistar™
24-1188 Agenda Date: 2/19/2025
Circulation and Parking
Primary access to the project site is from Freedom Circle via Mission College Boulevard, and from Bowers and Great America exit on US Route 101 via Hichborn Drive. The project would construct a seven-foot wide sidewalk along the project site perimeter, and a Class IV separated bikeway along Freedom Circle and Mission College Boulevard. A new 28-foot-wide two-way east/west private street roughly dividing the project site into a northern half and a southern half would be added. It would include bike lanes, six-foot pedestrian sidewalks on both sides, and a landscape parkway in-between the street and sidewalk. The curb cuts along Freedom Circle would be consolidated to open onto the new east/west private street to minimize the bike/pedestrian and vehicle conflicts. A north/south pedestrian path connects Mission College Boulevard to the proposed 3.48-acre public park at the southern edge of the project site across the street from the approved two-acre public park on the Greystar project site, leading to the San Tomas Aquino Creek trail. A crosswalk is proposed on Freedom Circle on the southeast corner across from the two parks. Staff recommends a crosswalk on the intersection of the project site and the trail.

The project provides a total of 2,459 parking spaces, whereas the code requires 2,126 parking spaces. The proposed parking .exceeds the parking requirement per Zoning Code Section 18.22.050 to provide one parking space for each of the studio and one-bedroom units and 1.5 parking spaces for each of the two-bedroom units. Loading zones would be provided for each building. The proposed public park will also include a parking lot with approximately 15 parking spaces to be used by park visitors. Consistent with the City Code, the project would provide one secure private bicycle parking space per unit located in the five parking garages with electrical outlets (1,792 total bicycle parking spaces), 120 short-term, public Class II bike racks within public park space, do-it-yourself bicycle repair facilities (e.g., air pump and basic tools) so cyclists can conduct repairs as needed, and e-bike charging stations.

Landscaping and Open Space
The project includes a landscape plan for the site that incorporates a mixture of plant species and trees for planting within courtyards, interconnected green common areas and along the project perimeter. Of the total 417 existing onsite trees, 94 trees will be preserved, 36 trees will be transplanted, and 287 trees shall be removed. As a condition of project approval, the project will replace the removed trees at a minimum of 2:1 with 24-inch box species or equivalent. The proposed project would include the planting of approximately 932 trees, at least 24-inch box trees throughout the site, exceeding the requirement to plant 574 trees.

Subdivision
In accordance with Chapter 17.05 of the City Code, the project requires a tentative subdivision map.

The application proposes five residential lots, and one lot dedicated for the public park. The Subdivision Committee reviewed and deemed the application cleared on December 10, 2024, satisfying code requirements, and including conditions of approval contained in Attachment # 7.

ENVIRONMENTAL REVIEW
An Addendum to the Freedom Circle Future Focus Area Plan Environmental Impact Report (EIR) (2022) was prepared for the project by the environmental consultant firm MIG, Inc, in accordance with the California Environmental Quality Act (CEQA) and was posted on the City’swebsite (weblink provided in Attachment 1). The Addendum concluded that the proposed project would not cause substantial changes to the previously approved EIR. This Addendum includes four refinements to 2022 EIR mitigation measures which provide clarification and detailed protocols for project-specific City of Santa Clara Printed on 2/13/2025Page 8 of 11
powered by Legistar™
24-1188 Agenda Date: 2/19/2025
2022 EIR mitigation measures which provide clarification and detailed protocols for project-specific implementation of the 2022 EIR mitigation measures: one in Air Quality, two in Biological Resources, and one in Cultural Resources. No further evaluation is required, and no Subsequent or Supplemental EIR is needed pursuant to State CEQA Guidelines Section 15162, and an EIR Addendum has therefore appropriately been prepared, pursuant to Section 15164. Pursuant to CEQA Guidelines Section 15164(c), this Addendum will not be circulated for public review but will be included in the public record file for the project approval.

FISCAL IMPACT
There is no fiscal impact to the City for processing the requested application other than administrative time and expense typically covered by processing fees paid by the applicant. To comply with the General Plan policy 5.1.1-P8, a fiscal evaluation of the project was prepared for the project. It concluded the project is expected to result in a positive net fiscal impact on the City’s General Fund at buildout and on the Santa Clara Unified School District’s (SCUSD) operating budget.

COORDINATION
This report has been coordinated with the City Attorney’s Office, Parks and Recreation Department and Public Works Department.

PUBLIC CONTACT
On February 5, 2025, a hearing notice was published in the Santa Clara Weekly and on February 13, 2025 a notice was published in the San Jose Mercury News. On February 6 and February 13, 2025, a notice of public hearing for this item was mailed to property owners within 1,000 feet of the project side boundaries and interested parties. Staff has received several public comments on the project including from Catalyze SV, the Housing Action Coalition, and the Silicon Valley Bicycle Coalition and they are available as Attachment # 8.

Community Meetings
Consistent with the City’s Public Outreach Policy for Planning Applications, public outreach meetings were conducted by the Property Owner/Applicant on May 13, 2024 (hybrid) and on October 16, 2024 (in-person), to engage the neighborhood community in the planning process. Notices of the meetings were mailed by the Property Owner/Applicant to properties within 1,000 feet of the project site boundaries and recording and meeting minutes were posted on the City’s website. These meetings provided the community opportunities to review and comment on the proposal. Key topics at these meetings included land use and density, affordability, Transportation and Parking, preserving onsite trees, bike and pedestrian connectivity and environmental sustainable features.

ALTERNATIVES

1. Adopt a resolution recommending the City Council adopt the Addendum to the Freedom Circle Future Focus Area Plan Environmental Impact Report (EIR) (2022), and the Mitigation Monitoring and Reporting Program for Santa Clara Park Residential Project at 2518 Mission College Boulevard.

2. Adopt a resolution recommending the City Council approve the General Plan text amendment to add a new policy to the Freedom Circle Focus Area to clarify that a Planned Development rezone satisfies the requirement of a comprehensive plan for the project at 2518 Mission College Boulevard.

3. Adopt a resolution recommending the City Council approve a rezoning of the project site from High Intensity Office and R & D (HO-RD) to Planned Development (PD) to allow construction City of Santa Clara Printed on 2/13/2025Page 9 of 11
powered by Legistar™
24-1188 Agenda Date: 2/19/2025
of residential development consisting of 1,792 units, 3,500 square feet retails, 4.225 acres of public parks, landscaping, and on- and off-site improvements at 2518 Mission College Boulevard, subject to conditions of approval.

4. Adopt a resolution recommending City Council approve a Vesting Tentative Subdivision Map to subdivide the land into six individual lots to serve the proposed development at 2518 Mission College Boulevard, subject to conditions of approval.

5. Recommend the City Council deny the General Plan text amendment to add a new policy to the Freedom Circle Focus Area that would have clarified that a Planned Development rezone satisfies the requirement of a comprehensive plan for the project at 2518 Mission College Boulevard.

6. Recommend the City Council deny the rezoning of the project site from High Intensity Office and R & D (HO-RD) to Planned Development (PD) to allow construction of residential development consisting of 1,792 units, 3,500 square feet retails, 4.225 acres of public parks, landscaping, and on- and off-site improvements at 2518 Mission College Boulevard.

7. Recommend the City Council deny the Vesting Tentative Subdivision Map to subdivide the land into six individual lots to serve the proposed development at 2518 Mission College Boulevard.

RECOMMENDATION
Alternatives: 1, 2, 3 and 4

1. Adopt a resolution recommending the City Council adopt the Addendum to the Freedom Circle Future Focus Area Plan Environmental Impact Report (EIR) (2022), and the Mitigation Monitoring and Reporting Program for Santa Clara Park Residential Project at 2518 Mission College Boulevard.

2. Adopt a resolution recommending the City Council approve the General Plan text amendment to add a new policy to the Freedom Circle Focus Area to clarify that a Planned Development rezone satisfies the requirement of a comprehensive plan for the project at 2518 Mission College Boulevard.

3. Adopt a resolution recommending the City Council approve a rezoning of the project site from High Intensity Office and R & D (HO-RD) to Planned Development (PD) to allow construction of residential development consisting of 1,792 units, 3,500 square feet of retail, a 4.225 acres of public parks, landscaping, and on- and off-site improvements at 2518 Mission College Boulevard, subject to conditions of approval.

4. Adopt a resolution recommending City Council approve a Vesting Tentative Subdivision Map to subdivide the land into six individual lots to serve the proposed development at 2518 Mission College Boulevard, subject to conditions of approval.

Prepared by: Nimisha Agrawal, Senior Planner
Reviewed by: Alexander Abbe, Assistant City Attorney
Approved by: Lesley Xavier, Planning Manager

ATTACHMENTS

1. Link to the Addendum to the Freedom Circle Future Focus Area Plan Environmental Impact Report (EIR) (2022)

2. Resolution Recommending Council adopt the Addendum to the Freedom Circle Future Focus Area Plan EIR

3. Resolution Recommending Council Approve the General Plan Amendment

4. Resolution Recommending Council Approve the Rezone
City of Santa Clara Printed on 2/13/2025Page 10 of 11
powered by Legistar™
24-1188 Agenda Date: 2/19/2025

5. Resolution Recommending Council Approve the Vesting Tentative Subdivision Map

6. Conditions of General Plan Amendment and Rezoning Approval

7. Conditions of Tentative Subdivision Map Approval

8. Public Comments Received

9. Project Data Table

10. Freedom Circle Future Focus Area Plan Conformance

11. Planned Development Document

12. Vesting Tentative Subdivision Map

13. Vicinity Map
City of Santa Clara Printed on 2/13/2025Page 11 of 11
powered by Legistar™

Link to the Addendum to the Freedom Circle Future Focus Area Plan Environmental Impact Report (EIR) (2022)

This document is available for review in the Community Development Department Planning Division
Correspondence
3/25/25 City Council Meeting
2518 Mission College Blvd.

RTC 25-166
From:

To:

Subject:

Date:
__,
Building Houses with no solution for water is nonsense! Monday, April 29, 2024 4:33:42 PM
I You don't ofte n get email from
I find it disturbing that Santa Clara is gleefully authorizing housing when we live in a desert.

You expect those of us here to use less and less water while authorizing the building of more and more housing.

Where is plain common sense?
What will 1792 apaiime nts require in the way of additional water? Let's assume 2 or 3 people, toilets, baths, launchy, dishes? And you want me to not water my l0sq feet of yai·d that feeds hummingbird s, bees and helps provide oxygen to the environment. Ridiculous! What is the city's solution? It is like sticking your head in the sand. One day you tum on the faucet and there will not be one ch·ip! How many jobs will there be when this happens.

Brenda
VenetianBeadShop.com
From:

To:

Cc:

Subject:

Date: Friday, September 20, 2024 11:05:30 AM
I You don't often get email from
Hello Carlene and Jim,
Thank you for presenting Irvine Company's Santa Clara Park to om members at last month's Project Advocacy Committee meeting.

Your project scored 3.43 out of 5 among our members. Overall, our members particularly liked these aspects of the project:
• bicycle infrastmcture enhancements
• commitment to the preservation of existing redwood trees • ongoing monthly meetings with the community
Although some aspects were well received, the project did not meet our 3.5 out of 5 threshold for advocacy. Our goal is for projects to score as high as possible, and we are confident that with our members' feedback, Santa Clara Park can achieve a higher score. The following documents contain our members' recommendations and suggestions:

1. Letter : Positive elements and recommendations

2. Scorecard : Our members' scores for each of our categories In the meantime , we're happy to set up a call to answer any questions you may have about our members' feedback.

In the coming days, we will post the project on our website . The page will include the letter and scorecard shared above.

Thanks again for sharing Santa Clara Park with us. We look fo1ward to continuing to work with you on this project.

Best,
Jake Wilde
Manager of Development Projects I Catalyze SV
www.CatalyzeSiliconValley.org
www.CatalyzeSiliconValley.org
September 20, 2024
Carlene Matchniff
Irvine Company
5451 Great America Pkwy, #201
Santa Clara, CA 95054
Jim Cunneen
California Strategies
RE: Irvine Company Proposal for Santa Clara Park
Dear Carlene & Jim,
Thank you for sharing Irvine Company’s Santa Clara Park with our members at our August 28 Project Advocacy Meeting. As we understand it, Santa Clara Park is a five-building, 1,792-unit mixed-income development located on a 25.74-acre site at 2518 Mission College Boulevard. The proposal will replace the existing 12 office buildings with 6.43 acres of public open space and over 1,740,000 square feet of residential space. The residential units are split between all five-story buildings that are a mix of studios, 1-bedrooms, and 2-bedrooms. Each bedroom contributes one parking space for a total of 2445 parking spaces plus an additional 90 spaces for visitors and guests. Plans also call for a small 4,000-square-foot centrally located cafe, as well as amenities for residents only, like a fitness center, co-working space, and two swimming pools.

With the project well underway, our members would like to offer the following feedback and suggestions:

Standout Elements:

Community
As advocates of inclusive engagement, our members are pleased with Irvine Company’s efforts to engage the community, especially its future plans for monthly meetings where community members can get involved in the development process. Our members recommend these meetings be advertised to the community through sufficient channels so as to reach as many folks as possible. Additionally, since Santa Clara Park is geared toward young, working professionals, some of our members want to see Irvine Company directly reach out to Mission College students, located just a few blocks down the street. The student community could be the focus of one of the monthly meetings.

Sustainability
Our members appreciate and recognize Santa Clara Park as a standout project in our sustainability category. The project is aiming for GreenPoint Gold certification, will 1 CATALYZE SV
www.CatalyzeSiliconValley.org
have rooftop photovoltaics, and makes use of reclaimed water. These features put Santa Clara Park a head above the rest. For Santa Clara Park to improve even further in this category, some of our members would like to see the project better interface with the plants and wildlife of the San Tomas Aquino Creek. They suggest incorporating more riparian vegetation as well as pollinator-friendly trees into the project’s plentiful open green space. Members also want to see the project’s windows made bird-safe, as San Tomas Aquino Creek is a habitat for a plethora of diverse bird species.

Legacy
Members of Catalyze SV do not typically score projects in our Legacy category but felt it was important and relevant to Santa Clara Park in one regard—the preservation of the redwood trees. Our members are ecstatic to hear that Irvine Company is making the effort to preserve as many of the existing redwood trees as possible. As the site is currently a parking lot and private office campus, our members hope the community will one day be able to enjoy the redwood trees as part of a public park. We will be tracking this aspect of the project to make sure Irvine follows through on preserving the redwoods.

Elements to Improve:

Vibracny
Finding and keeping commercial tenants isn’t always easy. Our members understand this. Yet the more people in an area, the more it can support vibrant activity like retail and restaurants. We are impressed by Irvine Company’s partial solution to this issue—operate its own in-house cafe and market. While we have never heard of this model, Irvine Company has tested a similar approach at its Redwood Place project in Sunnyvale. As described to us, this type of establishment will sell a range of goods to residents and the public, potentially filling a role similar to a convenience store. The cafe is a positive step. Our members stand by a bigger approach to vibrancy that entails more ground-floor activations near residents. We want Irvine Company to activate more space in the development for neighbors. River View Apartment Homes, a 1,308-unit Irvine Company community in San Jose, hosts a diverse collection of businesses, including restaurants, healthcare providers, and financial services. Our members note that Santa Clara Park’s neighboring Irvine property, Santa Clara Square, has some noteworthy retail but lacks a substantial connection to Santa Clara Park as they are on opposite sides of Highway 101. The trail beneath the highway is not the same as a walkable neighborhood street. It is especially problematic at night or for those more vulnerable who would fear for their safety going under an overpass. Santa Clara Park should attempt to foster its own activity hub that does not rely on Santa Clara Square’s existing amenities, especially considering it proposes so many homes as part of this project. It should consider complementing its solar rooftops with activation on top of them for residents. Housing is 2 CATALYZE SV
•
www.CatalyzeSiliconValley.org
wonderful and our region’s highest need, yet we need complete neighborhoods if we’re truly providing livable communities. Santa Clara Park needs to be a next-generation development.

Transportation
The San Tomas Aquino Creek Trail is the existing active transportation connection between Santa Clara Park and Santa Clara Square. The distance between the two properties is roughly one mile, and it would take a bicyclist at an average speed of roughly six and a half minutes on a mixed-use path. Our members appreciate that Santa Clara Park will improve cycling access from the site to the trail by installing new bike lanes along Freedom Circle. However, they are concerned regarding the reliability of the trail as the main connection to Santa Clara Square, which, in addition to a grocer and a few other businesses, primarily hosts restaurants and bars. During the day, commuting between the two locations is not an issue, but the trail closes at sunset. This means that during the busiest hours, traveling by car is the most viable option. Even if the trail were open, it would need significant lighting improvements to make it safe. It is an unfortunate situation, especially since our members are very impressed by the other cycling accommodations, like the 1,792 private bicycle stalls for residents. This is a huge effort by Irvine and represents the best of current development projects. We encourage Irvine Company, Valley Water, and Santa Clara to work together to enhance the north-south connection between these sites. As is, the only option for anyone outside of a car past sunset is to ride or walk along a six-lane highway service interchange.

Intensity/Zoning
Santa Clara Park proposes a total of 1,792 units split between five, five-story buildings.

Our members understand this is a typical footprint for an Irvine Company project, but as advocates for dense urban housing, we want Santa Clara Park to match not just higher possible densities allowed by the construction type Irvine proposes here but also match the existing character of the neighborhood. Directly to the project’s south are two 11-story buildings. To the project’s west are another two 12-story buildings, and north of those is the 14-story Santa Clara Marriott. East of the project is Mission City Center, a 13-story high-rise accompanied by a separate seven-story parking garage. At only five stories, Santa Clara Park is rather short in the surrounding context. In the midst of our housing crisis, where supply is nowhere near meeting demands, our members want to see projects that maximize the use of our scarce land and deliver as many homes as possible. We urge the developer to increase the height by two to three stories. Again, an urban development in Silicon Valley in 2024 cannot leave this many homes on the table when they are feasible. We will fight hard to support Irvine Company in making this change.

Affordability
Santa Clara Park proposes a total of 1,792 units split between five, five-story buildings.

Our members understand this is a typical footprint for an Irvine Company project, but 3 •
~
w

CATALYZE SV
www.CatalyzeSiliconValley.org
as advocates for dense urban housing, we want Santa Clara Park to match not just higher possible densities allowed by the construction type Irvine proposes here but also match the existing character of the neighborhood. Directly to the project’s south are two 11-story buildings. To the project’s west are another two 12-story buildings, and north of those is the 14-story Santa Clara Marriott. East of the project is Mission City Center, a 13-story high-rise accompanied by a separate seven-story parking garage. At only five stories, Santa Clara Park is rather short in the surrounding context. In the midst of our housing crisis, where supply is nowhere near meeting demands, our members want to see projects that maximize the use of our scarce land and deliver as many homes as possible. We urge the developer to increase the height by two to three stories. Again, an urban development in Silicon Valley in 2024 cannot leave this many homes on the table when they are feasible. We will fight hard to support Irvine Company in making this change.

Santa Clara Park has the potential to provide a home to thousands of people, and we will fight hard to turn that potential into reality. After decades of declining housing construction and underbuilding, it is crucial to maximize density whenever the opportunity arises. We hope Santa Clara and Irvine Company will work together to find a path that makes the most out of this site.

Sincerely,
Catalyze SV’s staff and Project Advocacy Committee members CC: [email protected]
Mayor Lisa Gillmor ([email protected])
Kathy Watanabe ([email protected])
Karen Hardy ([email protected])
Suds Jain ([email protected])
Raj Chahal ([email protected])
Kevin Park ([email protected])
Anthony Becker ([email protected])
City Clerk ([email protected])
Nimisha Agrawal ([email protected])
Lesley Xavier ([email protected])
Reena Brilliot ([email protected])
Planning Commission ([email protected]) Planning Division ([email protected])
Benjamin Demers
Cade Story- Y etto
Rachael Gibson
Roseryn Bhudsabourg
Genevieve Yip
Carlene Matchni
ff
Jim Cunneen
Jimmy Ly
4 CATALYZE SV
www.CatalyzeSiliconValley.org
About Catalyze SV
Catalyze SV’s Project Advocacy Committee is comprised of community members who identify, evaluate, & lead advocacy e
fforts around speci fic development projects.
5 CATALYZE SV
Project Review Scorecard
Project Under Review: Santa Clara Park
Project Applicant: Irvine Company
Review Date: August 28, 2024

Page 4 ends

Community Score: 4/5
As advocates of inclusive engagement, our members are pleased with Irvine Company’s efforts to engage the community, especially its future plans for monthly meetings where community members can get involved in the development process. Our members recommend these meetings be advertised to the community through sufficient channels so as to reach as many folks as possible. Additionally, since Santa Clara Park is geared toward young, working professionals, some of our members want to see Irvine Company directly reach out to Mission College students, located just a few blocks down the street. The student community could be the focus of one of the monthly meetings.

Vibrancy Score: 3/5
Finding and keeping commercial tenants isn’t always easy. Our members understand this. Yet the more people in an area, the more it can support vibrant activity like retail and restaurants. We are impressed by Irvine Company’s partial solution to this issue—operate its own in-house cafe. While we have never heard of this model, Irvine Company has tested a similar approach at its Redwood Place project in Sunnyvale. As described to us, this type of establishment will sell a range of goods to residents and the public, potentially filling a role similar to a convenience store. The cafe is a positive step. Our members stand by a bigger approach to vibrancy that entails more ground-floor activations near residents. We want Irvine Company to activate more space in the development for neighbors. River View Apartment Homes, a 1,308-unit Irvine Company community in San Jose, hosts a diverse collection of businesses, including restaurants, healthcare providers, and financial services. Our members note that Santa Clara Park’s neighboring Irvine property, Santa Clara Square, has some noteworthy retail but lacks a substantial connection to Santa Clara Park as they are on opposite sides of Highway 101. The trail beneath the highway is not the same as a walkable neighborhood street. It is especially problematic at night or for those more vulnerable who would fear for their safety going under an overpass. Santa Clara Park should attempt to foster its own activity hub that does not rely on Santa Clara Square’s existing amenities, especially considering it proposes so many homes as part of this project. It should consider complementing its solar rooftops with activation on top of them for residents.

Housing is wonderful and our region’s highest need, yet we need complete neighborhoods if we’re truly providing livable communities. Santa Clara Park needs to be a next-generation development. 1 CATALYZE SV
Transportation Score: 3/5
The San Tomas Aquino Creek Trail is the existing active transportation connection between Santa Clara Park and Santa Clara Square. The distance between the two properties is roughly one mile, and it would take a bicyclist at an average speed of roughly six and a half minutes on a mixed-use path. Our members appreciate that Santa Clara Park will improve cycling access from the site to the trail by installing new bike lanes along Freedom Circle. However, they are concerned regarding the reliability of the trail as the main connection to Santa Clara Square, which, in addition to a grocer and a few other businesses, primarily hosts restaurants and bars. During the day, commuting between the two locations is not an issue, but the trail closes at sunset. This means that during the busiest hours, traveling by car is the most viable option. Even if the trail were open, it would need significant lighting improvements to make it safe. It is an unfortunate situation, especially since our members are very impressed by the other cycling accommodations, like the 1,792 private bicycle stalls for residents. This is a huge effort by Irvine and represents the best of current development projects. We encourage Irvine Company, Valley Water, and Santa Clara to work together to enhance the north-south connection between these sites. As is, the only option for anyone outside of a car past sunset is to ride or walk along a six-lane highway service interchange.

Sustainability Score: 4/5
Our members appreciate and recognize Santa Clara Park as a standout project in our sustainability category. The project is aiming for GreenPoint Gold certification, will have rooftop photovoltaics, and makes use of reclaimed water. These features put Santa Clara Park a head above the rest. For Santa Clara Park to improve even further in this category, some of our members would like to see the project better interface with the plants and wildlife of the San Tomas Aquino Creek. They suggest incorporating more riparian vegetation as well as pollinator-friendly trees into the project’s plentiful open green space. Members also want to see the project’s windows made bird-safe, as San Tomas Aquino Creek is a habitat for a plethora of diverse bird species.

Intensity/Zoning Score: 3/5
Santa Clara Park proposes a total of 1,792 units split between five, five-story buildings. Our members understand this is a typical footprint for an Irvine Company project, but as advocates for dense urban housing, we want Santa Clara Park to match not just higher possible densities allowed by the construction type Irvine proposes here but also match the existing character of the neighborhood. Directly to the project’s south are two 11-story buildings. To the project’s west are another two 12-story buildings, and north of those is the 14-story Santa Clara Marriott. East of the project is Mission City Center, a 13-story high-rise accompanied by a separate seven-story parking garage. At only five stories, Santa Clara Park is rather short in the surrounding context. In the midst of our housing crisis, where supply is nowhere near meeting demands, our members want to see projects that maximize the use of our scarce land and deliver as many homes as possible. We urge the developer to increase the height by two to three stories. Again, an urban development in Silicon Valley in 2024 cannot leave this many homes on the table when they are feasible. We will fight hard to support Irvine Company in making this change.
2 CATALYZE SV
•
Affordability Score: 3/5
Santa Clara Park complies with the city’s Affordable Housing Ordinance by providing 15% of units as deed-restricted affordable housing. Our members are glad to see these units will be on-site and integrated with the market-rate units. As presented to our members, the project aims to provide 5% of the affordable units to very low-income households, which for a two-person household is $73,750, and the remaining 10% of units will be provided to households earning the area median income, $147,450 for a household of two. Our members value deeply affordable housing and also recognize the potential for “affordable by design” units to deliver lower housing costs, but ultimately it is deed-restricted affordable housing that provides the greatest impact. While $147k meets the legal definition of affordable housing, this is well above a middle-class income, even in Silicon Valley. As such, our members encourage the developer to offer all the affordable units to households in very low or lower income levels to serve our neediest neighbors.

Legacy Score: 4/5
Members of Catalyze SV do not typically score projects in our Legacy category but felt it was important and relevant to Santa Clara Park in one regard—the preservation of the redwood trees.

Our members are ecstatic to hear that Irvine Company is making the effort to preserve as many of the existing redwood trees as possible. As the site is currently a parking lot and private office campus, our members hope the community will one day be able to enjoy the redwood trees as part of a public park. We will be tracking this aspect of the project to make sure Irvine follows through on preserving the redwoods.

Cumulative Score: 3.43 out of 5
3 ~
w
•

CATALYZE SV

OVERVIEW
This project review scorecard provides guidelines for consistently evaluating how a proposed development aligns with Catalyze SV’s values. Catalyze SV’s values are:
● Inclusive, Diverse Communities
● Healthy, Sustainable Development
● Convenient Transportation Choices
● Housing Solutions for All
● Vibrant Places for People
● Equitable Community Engagement
Grading Criteria - Merits
Community: The applicant is making signi ficant efforts to reach out to the community, including underrepresented** voices, and has addressed recommendations collected through community engagement.

Vibrancy: The proposal seizes locational opportunities and includes features to enhance the human experience of the site and neighborhood. Public and private space is designed to promote physical, mental, and/or social well-being while connecting with parks, fresh food, and/or other community amenities.

Transportation: The project recognizes the growing importance of a variety of mobility solutions, incentivizes reduced automobile usage, and measures mobility after the project is built and occupied. Transportation Demand Management plans are encouraged.

Sustainability: The project incorporates measurable green building features. CalGreen Tier 1/2 measures and/or third-party certi
fications (LEED, WELL, Living Building Challenge, etc) are encouraged. Some features can be found here:
https://www.catalyzesiliconvalley.org/sustainable-features.

Intensity/Zoning: The project utilizes nearly the full density allowed under its zoning and general plan designations.

A
ffordability: The proposal considers protections or relocation bene fits for existing residential and/or commercial tenants that may be displaced. It goes beyond current government requirements for onsite, below-market-rate homes, stabilized commercial leases, or appropriate substitutes.

Legacy (when applicable): The project undertakes e fforts to incorporate, protect, or preserve any objects of signi ficant cultural or historic merit identi fied by the community on or near the site.
** = Research has shown that renters, new residents, people of color, younger people, and females tend to be underrepresented voices on local development issues. (1 2 3) Grading Scale - Merits
An average score of 3.5 is required for Catalyze SV to consider advocating full support for a project.
1 = Fails to meet project review criteria
2 = Meets some project review criteria
3 = Meets basic project review criteria
4 = Exceeds project review criteria
5 = Goes far beyond project review criteria
N/A = Category does not apply
4 • •
~
• • e
•

CATALYZE SV
Catalyze SV
www.CatalyzeSiliconValley.org
Dear Catalyze SV Staff & Project Advocacy Committee members:

Thank you for taking the time to review Irvine Company’s proposed Santa Clara Park Project located at 2518 MIssion College Blvd, Santa Clara. We are writing to add additional information that was in process or still under review by the City of Santa Clara at the time we presented our proposed project to your group on August 28, 2024. Your support is important to us and we hope that we will be able to provide you with additional information and clarify points to gain Catalyze’s support for the project.

Community
We appreciate and share CatalyzeSV’s commitment to engaging with the community. We will continue our outreach throughout the entitlement process via community meetings, our project website and ongoing engagement with local residents and organizations. Upcoming community meetings will be posted on the city’s website.

Sustainability
Sustainability has always been a central tenet of Irvine Company developments, an example of which are the nearby Santa Clara Square and Redwood Place developments. In response to your comments, we would like to clarify the following points from your letter:
● Reduced Runoff: The project will significantly decrease impervious area resulting in less runoff when compared to current conditions.
● Improved Water Quality: Bioretention treatment is designed to filter out pollutants prior to stormwater entering natural systems.
● Green Infrastructure Amenity: The treatment areas provide an additional landscaping amenity for pedestrian use around the site.
● Heat Reduction: Treatment areas and vegetation around the site help lower site surface temperatures when compared to current conditions.
● Installation of all electric appliances.
● The project includes 50% EV stall capacity.
● The Landscape Plant palette will be climate appropriate to the region with a focus on Mediterranean and drought tolerant species that meet or exceed local and regional water use regulations.
● Windows will be bird friendly.
● Carbon Capture and Sequestration through preserving, relocating, or reusing existing Redwood trees and planting 997 new trees.
frl IRVINE COMPANY
~<J' APARTMENT DEVELOPMENT
● Photovoltaic Systems installed on garage and residential roof tops to benefit common area energy usage.
● Reducing vehicle miles traveled by 20% over existing conditions, including 10% from TDM measures, and 10% from physical design features.
● Extending reclaimed water line to complete Freedom Circle Loop. ● The sustainable features of the project would achieve LEED Gold equivalent.

Legacy
Tree preservation. Of the 417 existing trees on-site, we plan on preserving approximately 130..

This will include protecting-in-place 81 Coast Redwoods, 14 Japanese Zelkovas (large, existing street trees along Mission College), and 1 Stone Pine. We will also box and relocate another 34 existing Redwoods elsewhere on the project site. Existing trees requiring removal due to health or other reasons will be replaced at a 2:1 ratio at a size of 24” Box or larger per the City of Santa Clara guidelines. We intend to add approximately 997 new trees (quantity subject to change during the design process) which is well over the 578 required by the city’s tree replacement standards. For those redwood trees unsuitable for preservation, an effort will be made (where feasible) to repurpose the salvaged wood into furniture or other site elements within the landscape.

Throughout the project will be a series of miniparks which will take inspiration from “The Life Cycle of Redwoods”. Each mini-park will include themed, educational or interactive spaces focused on each phase of a redwoods growth starting from Seed, growing into Sapling, Fully Mature Tree/ Forest, and Fallen Logs. A continuous trail system throughout the community will interlink all of these spaces together and connect them to our large, neighborhood park at the southern end of the site which features several active and passive spaces tucked into several mature Redwoods Groves.

Beyond this plan, our scale and commitment to community forestry has allowed us to plant more than 550,000 trees that sequester 7 million pounds of carbon. I invite you to learn more about our community forestry program here: irvinecompany.com/communityforestry/ Vibrancy
Consistent with the City of Santa Clara’s Freedom Circle Focus Area Plan, the site is designated as a high-density residential community with commercial uses adjacent. However, in addition to housing, we are offering an on-site centrally located market/cafe managed by Irvine Company to provide residents, neighboring office tenants and park users, daily food and beverages from the opening of the project. This will cut down auto trips and allow residents daily conveniences without getting into their cars.
frl IRVINE COMPANY
~<J' APARTMENT DEVELOPMENT
In addition, we have evaluated proximity to the food and services located within a 1-mile radius of our project. Our project design ensures the right balance of retail, and residential in both Santa Clara Park and our adjacent Santa Clara Square community, and believe this will create a cohesive, right-sized approach to mixed-use experiences.In addition, within this 1 mile radius are other retail options, including the Mercado shopping center.

Transportation
This project is designed to accommodate secure bicycle parking for each unit, located within bicycle rooms in each building garage. The project will also offer bicycle repair stations and electric bicycle charging in the bicycle rooms. Overall, the project is designed for connectivity adding 1 mile of dedicated bike lane improvements that will benefit not only this project but the region.

The San T omas Aquino trail, is a multi-jurisdictional, and multi-functional facility (containing both trail and environmentally sensitive areas) under the jurisdiction of public entities and, thus, not an element of our proposal (nor are there any conditions that would have to be universally applicable to other development in the region for undefined improvements). As such, we respectfully suggest that the scoring for our development should not be discounted in this area.

In terms of food and services, both the Mercado shopping center and Santa Clara Square are located nearby and the development will be located conveniently to use electric bikes, scooters, bicycles, and by foot within a 10 minute walk or ride.

Intensity/Zoning
As a long-term owner committed to preserving the quality and the identity of the communities we plan, we appreciate the City’s planning efforts with respect to the Freedom Circle Focus Area Plan. The Plan allows for a range of housing opportunities including developments assumed to be at a density range between 51-100 du/ac. The proposed development is about 69 du/ac. In addition to density, however, it is important to balance the character of our developments, the current pressing need for housing not only in context with adjacent land uses but in terms of the ability to deliver that housing given economic, infrastructure and overall mandated community elements such as parks, affordable housing, and other site-specific improvements. In that regard we have proposed the five-story wrap-type configuration. This product type strikes a balance between density and livability, providing both a high-quality living experience and compatible land use relative to the surrounding area and will result in housing designed to address needs of the nearby employment sectors. frl IRVINE COMPANY
~<J' APARTMENT DEVELOPMENT
Affordability
Affordable housing is an integral part of the Santa Clara Park plan. Unlike other developments that provide affordable housing off-site or pay fees (which are indeed essential elements as a part of an overall affordable housing strategy meeting other income level thresholds) we have proposed, including deed restrictions ensuring retention of affordability levels in perpetuity, that 15% of the total units (with 5%, at 50% AMI and 10% at 100% AMI) be provided in perpetuity within the Santa Clara Park community providing those employed in nearby job centers the ability to live close to where they work.

In addition to the 15% of units designated for deed restricted affordable housing, we are also providing a wide range or unit square footage options that are intended to provide affordable by design units. These units will provide additional moderate income units to the overall market.

We are hopeful the additional information provided here will assist Catalyze SV with the re-evaluation of our original scorecard. The City of Santa Clara identified the need to focus more growth in North Santa Clara through the vision created in the Freedom Circle Future Focus Area. An important part of this vision was identifying the need for more housing. Irvine Company looks forward to addressing a significant portion of this need with the plan we have created for the Santa Clara Park Redevelopment, central to Freedom Circle. Our plan is designed to address a range of housing types, including affordable housing, resident-serving amenities, a public park system, private open space, and connectivity to the surrounding community. Thank you for your consideration of our proposed development at Freedom Circle.

Sincerely,
Carlen
Matchni
Carlene Matchniff, Vice President Entitlements
Northern California
CC: [email protected]
Mayor Lisa Gillmor ([email protected])
Kathy Watanabe ([email protected])
Karen Hardy ([email protected])
Suds Jain ([email protected])
Raj Chahal ([email protected])
Kevin Park ([email protected])
Anthony Becker ([email protected])
frl IRVINE COMPANY
~<J' APARTMENT DEVELOPMENT
City Clerk ([email protected])
Nimisha Agrawal ([email protected])
Lesley Xavier ([email protected])
Reena Brilliot ([email protected])
Planning Commission ([email protected]) Planning Division ([email protected])
Benjamin Demers
Cade Story-Yetto
Rachael Gibson
Roseryn Bhudsabourg
Genevieve Yip
frl IRVINE COMPANY
~<J' APARTMENT DEVELOPMENT

January 15, 2025

Santa Clara City Planning Commission
1500 Warburton Ave, Santa Clara, CA 95050

Dear Mayor Gilmor, City Councilmembers, and Planning Commissioners,

The Housing Action Coalition is pleased to endorse the Irvine Company’s Santa Clara Park Apartment Community at 2518 Mission College Boulevard. After a detailed review, the committee is excited to support this project, which demonstrates a thoughtful and effective approach to addressing housing needs, affordability, and sustainability while fostering a vibrant and inclusive community.

The committee was particularly impressed by the scale and ambition of the project, which proposes 1,792 residential units, including 298 density bonus units, spread across five distinctive residential buildings. Of these, 1,206 units (70%) will be compact, averaging 667 square feet, while the remaining 586 units (30%) will average 839 square feet. The mix of studios, studios with dens, and one- and two-bedroom apartments will accommodate diverse demographic and economic needs, especially within the local workforce.

We commend the project’s strong commitment to affordability, meeting the City of Santa Clara’s 15% affordable housing requirement by designating 5% of the non-density bonus units for very low-income households and 10% for moderate-income households, with an average affordability of 100% AMI. This balance ensures that the development contributes significantly to Santa Clara’s affordable housing stock while fostering an economically diverse community.

The State has allocated 11,632 units to Santa Clara as their Regional Housing Needs Assessment or “RHNA”. Out of the 11,632 units, the City is required to build 1,981 moderate income units, and 2,872 very low income units. We commend the City’s progress towards their housing goals. The Irvine Company’s Santa Clara Park Apartment greatly contributes to the State mandated RHNA requirements.

The committee also praises the project’s exceptional design and integration of public and private open spaces. With over 6.4 acres of public parkland and 3 acres of private recreation areas, the development includes a wide variety of amenities: a flexible lawn, sports courts, playgrounds for different age groups, a dog park, and a ¾-mile walking and biking loop trail. These features create opportunities for both active and passive recreation, fostering social interaction and enhancing quality of life for residents and visitors alike.

The committee was further impressed by the project’s innovative sustainability features. The integration of photovoltaic systems, high-efficiency windows, Energy Star appliances, electric heat pumps, reclaimed water systems, and tree preservation initiatives highlight a strong commitment to environmental stewardship. With plans to preserve or relocate 148 mature trees, including iconic redwoods, the development will maintain a harmonious balance between urban growth and natural beauty.

In addition, the project’s focus on connectivity and accessibility is highly commendable. The site’s connection with the San Tomas Aquino Creek Trail and proximity to nearby employment hubs, retail centers, and public transportation options will reduce car dependency and enhance multimodal access for residents.

HOUSING

COALITION
555 Montgomery Stroot, suite 720
San Francisc o, CA 94111
info@h ousinguctio ncoalitio n.org
housi ng~ctio ncoa l ition.org
The Housing Action Coalition is pleased to support the Irvine Company’s Santa Clara Park Apartment Community. By delivering much-needed housing—including affordable units—alongside thoughtful design, sustainability, and community-focused amenities, this project sets a high standard for future development in Santa Clara.

Sincerely,
Corey Smith, Executive Director

HOUSING

COALITION
555 Montgomery Stroot, suite 720
San Francisc o, CA 94111
info@h ousinguctio ncoalitio n.org
housi ng~ctio ncoa l ition.org
Nimisha Agrawal
Subject: RE: Letter of Support for Proposed Irvine Company Apartment Development From: Emmy Moore M inister
Sent: Tuesday, January 14, 2025 2:54 PM
To: Mayor and Council <[email protected]> Subject: Letter of Support for Proposed Irvine Company Apartment Development You don 't often get email from
Santa Clara Mayor Lisa Gillmor and
Santa Clara City Council
Santa Clara Planning Commission
City of Santa Clara
1500 Warburton Ave.

Santa Clara, CA, 95050
January 14, 2025
Learn why this is important
Re: Letter of Support for the Proposed Apartn1ent Develop1nent by the Irvine Company
Dear Honorable Santa Clara Mayor Gillmor, Santa Clara City Council Members and Santa Clara Planning Commissioner s,
This letter is to express my support for Irvine Company's propo sed apartment development (which include s 1792 unit s) located at 2518-2650 Mission College Blvd. and 3900-3990 Freedom Circle in Santa Clara. This well-planned project will bring multipl e benefit s to the City of Santa Clara and the overall community starting with the city's need for additional housing, including affordable housing. 1 2
The Irvine Company has a proven track record of developing sustainable, thoughtfully planned communities. They make it a habit to always incorporate green building practices, energy-efficient technologies, and green open space which translates into a vibrant development that is environmentally responsible.

I became familiar with this well-thought-out project by attending community meetings where the developer has shared detailed plans for all components of this project while listening closely to the concerns and suggestions of meeting attendees.

In concert with its previous projects in Santa Clara, the Irvine Company remains committed to providing efficiently designed apartment units that will help meet the market demand.

Additionally, the project will create numerous construction jobs and employment opportunities for local workers, many of whom reside within the City of Santa Clara.

Tenants attracted to this highly sustainable apartment community will contribute to our local economy through their support of nearby businesses and services.

The proposed development is strategically located which will allow many of its residents to walk, bike or utilize nearby public transit. The attractively designed buildings surrounded by drought resistant landscaping and plenty of parklike open space (including a walking trail) coupled with a recreational area for youth and a dog park, will create a welcoming environment for residents and families. The plans also include a retail component on site which is yet another added benefit for residents and those who work in the area.

It is for all the reasons above, and more, I strongly encourage the Santa Clara City Council and its Planning Commission to approve this proposed project.

Respectfully submitted,
M. M.E. Emmy Moo
Minister
1 Nimisha Agrawal
Subject: RE: Letter of Support for the Proposed Santa Clara Park Apartment Development by the Irvine Company
From: Mary Grizzle
Sent: Saturday, January 11, 2025 1:19 PM
To: Mayor and Council <[email protected]>; PlanningCommission <[email protected]>
Subject: Letter of Support for the Proposed Santa Clara Park Apartment Development by the Irvine Company Mayor Gillmor, Santa Clara City Council and Santa Clara Planning Commissioners:

I am writing to strongly support Irvine Company’s Santa Clara Park apartment development which includes 1792 units located on Mission College Blvd in the Freedom Circle planning area of our city. Irvine is well kn ow for building beautiful communities including Santa Clara Square and Monticello.  This new project will continue their commitment to the City of Santa Clara by building needed new housing near jobs, including affordable housing, a new public park and improved bike lanes and trails. The Irvine Company has been a wonderful commu nity member supporting many non‐profits and
providing beautiful public parks. Their new proposal includes sustainable green building practices, solar rooftop energy and a commitment to preserving redwoods by designing the project around the natural environment. I attended two of their community meetings where the company shared the project details and re sponded to questions from the public.

The proposed development is strategically located which will allow many of its residents to walk, bike or utilize nearby public transit. The public park will include equipment for youth and a dog park.

In short it will be a welcoming place for residents and the public. It is for all the reasons above, and more, that I strongly
encourage the Santa Clara City Council and its Planning Commission to approve this proposed project.   Thank you for your consideration in approving this project.

Mary O. Grizzle

1 Nimisha Agrawal
Subject: RE: Irvines Santa Clara Park Development
From: Steve Kelly
Sent: Friday, January 10, 2025 8:34 PM
To: Mayor and Council <[email protected]> Subject: RE: Irvines Santa Clara Park Development
Dear Mayor Gillmor & City Council Members,
I had the opportunity to attend the Irvines Santa Clark Park presentation.

I like the fact that it is a mixed‐use development close to transit and Mission College. I also like that it is pedestrian and bike friendly with a large park on the site.  I like the mixture of retail, restaurants, jobs, and other a menities on the site.

I am in support of the project at this location.

Sincerely,
Steve Kelly
3093 Forbes Ave
Santa Clara, CA 95051
Irvines Santa Clark Park presentation

1 Nimisha Agrawal
Subject: RE: Letter of Support for the Irvine: Santa Clara Project with Park Redevelopment From: ana Vargas‐Smith
Sent: Tuesday, January 14, 2025 1:16 PM
To: Mayor and Council <[email protected]>; ana Vargas‐Smith Subject: Letter of Support for the Irvine: Santa Clara Project with Park Redevelopment

Dear Mayor and Council

Happy New Year!

Excited to see that Irvine has a new project near Mission College and Tech jobs that would provide much needed workforce housing to the area‐‐more welcoming and livable spaces with retail is always the ideal.

As a long‐tim
e local Resident of Santa Clara, it's great to see a quality development project that includes green places that protect and preserve 130 heritage Redwood trees, but also creates active neighborhood‐like spaces for recreation, gathering and retail‐‐something for everyone.   Not only does this project provide much needed placemaking with affordable housing strategicall y close to Mission College and a variety of Tech campuses, but it provides a 3 acre public park for recreation with bike and pedestrian paths that connect to light rail, nearby businesses and other retail like Santa Clara Square, grassy picnic and sports areas, a kids playground, a dog park for our
furry family members and access to nearby Trails.  Very Important given the density of 1700 units, that folks have access to amenities on the property and within biking and walking distance.

Irvine has a history of  working with our local community to build quality and successful mix ed use retail projects like Santa Clara Square, Monticello etc‐‐ but also giving back to the community with meaningful benefits like the SC City Library Bookmobile‐‐a favorite of mine, and a win for generations of Santa Clarans to come.

I have not seen many other developers who have delivered, not only on quality construction, public amenities and community benefits, but successfully recruited desirable quality merchants to their  mixed use projects‐‐ like Irvine has been able to do. So often the complaint by other developers is that doing retail is hard.  Well not for Irvine apparently.   I hope you are moved to support after reviewing the entire plann ed development‐‐like I was.

Many thanks for all you do for our community

Warm Regards

Ana Vargas‐Smith

Nimisha Agrawal
Subject: RE: Project Support
From: Charmein's Comcast
Sent: Monday, January 20, 2025 6:00 PM
To: Mayor and Council <[email protected]> Subject: Project Support
You don't often get email from Learn why this is important Dear Mayor Gillmor, City Council, and Planning Commissioners, I am writing to you in support of the proposed apartment development at 2518-2650 Mission College Blvd. and 3900-3990 Freedom Circle in Santa Clara.

As a long-time property owner in Santa Clara (and one who cares deeply about the future of the city), a few months ago I attended a community meeting hosted by the Irvine Company where I learned a lot about the proposed project.

It is well planned and accompanied by appropriate amenities for the tenant s including parklike open space, a dog park, walking trails, some retail offerings, and more.

This project will also help meet the cities housing shortage. I hope you will vote in favor of this project.

Sincerely,
Charmein Locascio
Warm regards,
Charmein
1 1
Nimisha Agrawal
Subject: RE: Support for Irvine Company’s new and amazing project ‐‐‐‐‐Original Message‐‐‐‐‐
From: constance costa
Sent: Saturday, January 11, 2025 6:15 PM
To: Mayor and Council <[email protected]>; PlanningCommission <[email protected]> Subject: Support for Irvine Company’s new and amazing project

[You don't oŌen get email from   Learn why this is important at hƩps://aka.ms/LearnAboutSenderIdenƟficaƟon ]

Mayor Gillmor, City Council & all our Planning Commissioners:

It is with great pride that I am endorsing
the Irvine Company’s new development project in Freedom Circle. I am so impressed with their meƟculous work that goes over and beyond the many projects that have been built locally such as recessed windows. You only have to mak e an appointment to see the difference for yourself all the special ameniƟes that they provide. I might also add their responsive Service teams keep the projects lively, well kept and all their tenants happy with the many ameniƟes Irvine Company provides, a safe environment, recre aƟon geared for all parks and even a dog park.

For these reasons, I am giving a huge thumbs up for this development and hope that the Council and Planning Commissioners do the same.

Thank you for your consideraƟon

Constance M. Costa

Nimisha Agrawal
To:

Cc:

Subject:

Mayor and Council
PlanninqCommission; Afshan Hamid
RE: Irvine Project
From: Ruben Camacho
Sent: Tuesday, January 21, 2025 1:44 PM
To: Mayor and Counci l <[email protected]> Subject: Irvine Project
You don 't often get email from Learn why this is important Dear Mayor, Council & Planning Commission,
First off thank you for your service to Santa Clara.

It is great to hear that Irvine has a new project , North of the Bayshore, near Mission College and High Tech jobs, that wou ld provide much needed qua lity housi ng to Santa Clara.

As a long-time local Resident of Santa Clara, my parents moved here in 1934, it's nice to see a development project, that includes park places and beautifu lly designed build ings.

Irvine has a strong history of working with our local community to build qua lity projects, like Santa Clara Square. Looking for to visiting this new wonderful development.

Asking for your support.

Best Regards
Ruben Camacho
55 plus year resident
of Santa Clara
1 January 22, 2025
Mayor Lisa Gillmor
Santa Clara City Councilmembers
1500 Warburton Avenue
Santa Clara , CA 95050
Anne J. Kepner
2128 Forbes Avenue
Sent Via Email Only: mayorandcouncil@santaclaraca gov
Re: Irvine Santa Clara Park Redevelopment Project
Dear Mayor Gillmor and Councilmembers,
I have been a resident of Santa Clara for more than 30 years and for the past 10 years have had the honor of serving as a Trustee for West Valley-Mission Community College District. While I live in District 6, serving as a trustee has provided me an opportunity to become familiar with the area surrounding Mission College. Our city is in need of more housing and the area near Mission College is an optimal location for new housing developments.

I have been provided an overview of the proposed Irvine Santa Clara Park Redevelopment project and, as an individual resident of Santa Clara, I support it for a number of reasons. First, the project contemplates close to 1,800 units, and 15% will be affordable housing units. As the cost of living continues to rise, it is important to add more housing units that are below market rate. Second, the proposed development is designed to encourage and promote walkability and bicycle use. These design features will likely increase the use of the nearby bike trails and public transportation, namely the light rail along Tasman. Third, this project would further support the existing retail properties near Mission College and at Santa Clara Square as well as the retail components of anticipated developments to be built north of Mission College. The vision for the area to the north and east of Mission College will result in a more vibrant and better integrated neighborhood for those who live and/or work in this part of Santa Clara. 1 urge you to support the Irvine Santa Clara Park Development and look forward to the continued growth and investment in the area of Santa Clara surrounding Mission College.

Hello Mayor Gillmor, Council, and Planning Commission,

I am wri�ng in support of the Irvine Company's project at Freedom Circle and would like to share a couple reasons why:

Since housing is one of the city's greatest needs, I like the 1,700+ high-density units this adds - in close proximity to a major work/office area. The high number of units that meet the affordable housing requirement further my support for this project.

I also like the crea�vity used to create a 3-acre park that will provide space for picnics, sports courts, a kids playground, a dog park, and other recrea�on. The apartment community itself will be friendly to bicyclists and people who want to walk to nearby Santa Clara Square, as well as their work & other dining des�na�ons.

The short walk to the San Tomas Aquino Trail opens up many access and recrea�on opportuni�es.

Overall, I see that the project delivers on promo�ng community, offers accessibility, increases connec�vity for residents, and is sustainable, with minimal demands on u�li�es.

The Irvine Company has been a good partner with Santa Clara for many years and has consistently demonstrated their willingness to listen to what the community wants and incorporate feedback into their designs. I have seen this first-hand through the recent community mee�ngs I have atended for this project.

I hope you can support this exci�ng project and help provide more housing in Santa Clara.

Thank you for your service to The City.

Sincerely,
Brian Goldenberg
50+year life-long Santa Clara Resident

From:

Daniel Meyberg
Director of Corporate Development
O2 Micro Interna�onal
3118 Patrick Henry Drive
Santa Clara, CA. 95054

To:

Santa Clara Mayor
Santa Clara City Council Members
Santa Clara Planning Commission

Subj: Support of the Irvine Santa Clara Park Redevelopment located near Mission College.

Dear Mayor Gillmor and members of the Santa Clara City Council and Planning Commission.

I am wri�ng in support of the Irvine Santa Clara Park Redevelopment located encircling Freedom Circle Drive, This project would greatly benefit the community by providing 1,792 apartment homes that include15% affordable housing requirement. Also, 70% of the units (1,239) will be designed to be affordable for the surrounding workforce, many of whom work and support the 1.7 million sq feet of high-tech employment space, much of which is within walking distance

The Santa Clara Park community supports a walkable, ac�ve, and social living experience including a large public park (3+ Acres) featuring flexible lawn for various sports configura�ons, family picnic areas, courts and kids' playground. Walk and Bike trails are throughout the development providing a ¾ mile loop trail that will link to San Tomas Aquino Creek trailhead that connects to the many high value des�na�ons including Santa Clara Square, Levi Stadium, the Santa Clara Conven�on Center, Light Rail, and the extensive Bay Trail network. Mission College, Santa Clara Square, and other nearby retail proper�es including large neighborhood retail centers anchored by Whole Foods Grocery, are just a short walk or ride away.

For these reasons, I urge your support of the Irvine Santa Clara Park Redevelopment. I feel this development will greatly benefit Santa Clara now and in the extended future.

Sincerely,
Daniel Meyberg

January 23, 2025

Dear Santa Clara Mayor, City Council and Planning Commission, The Irvine Company's proposed Santa Clara apartment project will benefit the community and local businesses. Below are some posi�ve points to consider:

1. Increased Housing Supply: The project can help address housing shortages in the area, and with units making it more affordable to live in Santa Clara.

2. Economic Growth: New residents o�en lead to increased demand for local businesses, poten�ally boos�ng sales for shops, restaurants, and services in the area.

3. Job Crea�on: The construc�on of the apartments will create jobs, both in the short term during the building phase and in the long term as new businesses emerge to help serve the growing popula�on.

4. Improved Infrastructure: Development o�en comes with upgrades to exis�ng infrastructure, including roads, public transport, and u�li�es, which can enhance the quality of life for all residents.

5. Community Ameni�es: This project has designated open space, a dog park, plus walking trails which will encourage recrea�on and promote social interac�on.

6. Sustainability Ini�a�ves: This project includes eco-friendly design and technology, which add to sustainability efforts and can lower the overall carbon footprint of the area.

7. Diversity and Inclusion: By providing various housing op�ons, the project can foster a more diverse community, promo�ng inclusivity and access for different demographics.

8. Tax Revenue: Increased housing and business ac�vity like this proposed project can lead to increased tax revenues, which can be directed towards public services and improvements like schools, public safety, and community programs.

I advocate for the proposed Irvine Company apartment housing project, and I encourage you to vote in favor of it, as it presents many posi�ve benefits for the community.

Sincerely,
Michael B. Villalpando, Principle
Na�onal Compassion Holiday, Founder
Hello, my name is Mike Walke (Santa Clara Resident) and I would like to offer my support of the Irvine Company's proposed apartment development located south of Mission College Boulevard. As you know 1,792 apartment homes are planned to be built on this site. The plan includes 269 (15 %) affordable housing units and an addi�onal 1,239 housing units to be built in the city of Santa Clara.

The project includes park, bicycle, and pedestrian friendly ameni�es. It offer's a walkable, ac�ve, diverse experience while promo�ng social interac�on. Integral to the site design is a 3- acre public park. The public park will feature a flexible lawn for ac�ve recrea�on, picnic areas, sports courts, kids' playground (with 2 separate areas serving ages 2-5 and ages 6-12), as well as a dog park. In addi�on, an interconnected set of trails throughout the perimeter will serve as an important public link to the San Tomas Aquino Creek trailhead.

During community mee�ngs the Irvine Company has commited to safeguarding heritage trees in their exis�ng loca�ons and strategically relocates trees deemed suitable for transplan�ng. The landscape plan envisions preserving approximately 130 exis�ng trees, including Redwoods and other species.

The Irvine Company has held three significant community mee�ngs reaching out to hundreds of residents like me. In addi�on, Irvine supports many nonprofits in our community as well.

I thank you in advance for your support of the Irvine Apartment Community project!

Sincerely
Mike Walke

cc: Mayor and Council

From:

To: Nimisha Agrawal
Cc:

Subject: Public comments on 2518 Mission College
Date: Wednesday, February 12, 2025 3:32:53 PM
Hello Nimisha (City Traffic Engineer and developer team cc'ed), Thank you for meeting with me last week. Can you please forward my comments along to the Planning Commission and include in their packet?
The Silicon Valley Bicycle Coalition is pleased to support the project at 2518 Mission College, with recommendations. The developer and owner, Irvine Group, proactively engaged the coalition with a presentation on the project. We support the project as it offers a mix of affordable as well as "affordable by design" units that will help address the affordable housing crisis. The developer commits to adding Class IV lanes on Freedom Circle and secure bike lockers with one space per unit. SVBC also reviewed the project's proposed TDM measures and we have the following recommendations of the Planning Commission:

While we are pleased to see commitment to secure bike parking facilities, we are skeptical of real mode shifts occurring without supporting programs and incentives. We offer the following recommendations to strengthen the mode-shift opportunities:

Built-in timelines/coordination between the City, subject property owner and adjacent to ensure the roads and trail improvements are completed in a timely manner.

More robust funding for transit passes. SVBC staff managed the TDM work on an affordable housing project that provided 1 year of free Caltrain passes to residents. A Clipper card that provided access to VTA, Bikeshare, Caltrain and Amtrak would help shift people out of their cars.

Work with the developer to bring Bikeshare to their site and the trail entry/exit. Provide reduced or free bikeshare for residents.

Provide e-bike charging stations for residents similar to the e-car requirements that many cities now have. Add these to the bike locker areas.

Ensure that the developer-owned connecting parks/facilities to the trail promote well- designed active uses and amenities such as tot lots, water bottle refill stations, etc.

SVBC would like to work with the developer and city to provide resources to residents about our programs, such as our valet bike parking for Levi's stadium , which is a short
bike ride away along a Class I trail from the project site.

Thank you for the opportunity to comment on this project. Please feel free to reach out to me with any questions.

Best,
--
Matt Jones
| he/him/his
Director of Advocacy
Silicon Valley Bicycle Coalition
Take Action | Bike Resources
Volunteer | Donate
•
•
•
•
•
•
•
Dear Commissioners,

I am writing to express strong support for the Irvine Company’s Santa Clara Park Apartment Community at 2518 Mission College Boulevard. This project will help address Santa Clara’s housing needs while creating a sustainable and welcoming community.

The project includes 1,792 apartments, with a variety of unit sizes to serve different needs. It also dedicates 15% of the units to affordable housing—5% for very low-income households and 10% for moderate-income households—helping meet the city’s housing goals.

I am excited about the project’s open spaces, which include over 6 acres of public parks and 3 acres of private recreation areas. Features like sports courts, playgrounds, a dog park, and walking trails will benefit both residents and the community.

The development’s sustainability features are also impressive. These include solar panels, energy-efficient appliances, and systems for conserving water. Preserving 148 mature trees, including redwoods, shows the project’s commitment to the environment.

The location of the project is ideal, with access to trails, jobs, shopping, and public transit. Its connection to the San Tomas Aquino Creek Trail and proximity to major employment hubs will enhance accessibility and reduce car dependency, making it easier for residents to get around while supporting sustainable transportation options.

This project is a great step toward meeting Santa Clara’s housing needs and creating a more sustainable and inclusive city. I encourage you to approve it and help bring these benefits to our community.

Sincerely,
Elizabeth Barcelos

95113

Dear Commissioners,

My name is Noah, and I have lived in Santa Clara my entire life. I now attend USC, where I study Urban Sustainable Planning. I am writing to express strong support for the Irvine Company’s Santa Clara Park Apartment Community at 2518 Mission College Boulevard. This project will help address Santa Clara’s housing needs while creating a sustainable and welcoming community.

The project includes 1,792 apartments, with a variety of unit sizes to serve different needs. It also dedicates 15% of the units to affordable housing—5% for very low-income households and 10% for moderate-income households—helping meet the city’s housing goals.

I am excited about the project’s open spaces, which include over 6 acres of public parks and 3 acres of private recreation areas. Features like sports courts, playgrounds, a dog park, and walking trails will benefit both residents and the community.

The development’s sustainability features are also impressive. These include solar panels, energy-efficient appliances, and systems for conserving water. Preserving 148 mature trees, including redwoods, shows the project’s commitment to the environment.

The location of the project is ideal, with access to trails, jobs, shopping, and public transit. Its connection to the San Tomas Aquino Creek Trail and proximity to major employment hubs will enhance accessibility and reduce car dependency, making it easier for residents to get around while supporting sustainable transportation options.

This project is a great step toward meeting Santa Clara’s housing needs and creating a more sustainable and inclusive city. I encourage you to approve it and help bring these benefits to our community. If more projects like these are not developed at a much higher rate, rents will remain high, and all my friends and I will have to leave the South Bay.

Sincerely,
Noah Schneider

95050

Dear Commissioners,
I support the Irvine Company’s Santa Clara Park Apartment Community at 2518 Mission
College Boulevard. This project will help address Santa Clara’s housing shortage while creating a sustainable and welcoming community.

I am a renter living in Santa Clara County who has struggled to find and afford housing. Our community desperately needs more homes at all income levels. I am excited that this project includes 1,792 apartments, with 15% of the homes dedicated to affordable housing—5% for very low-income households and 10% for moderate-income households—helping meet the city’s housing goals.

Furthermore, the location of the project is ideal, with access to trails, jobs, shopping, and public transit.

This project is a great step toward meeting Santa Clara’s housing needs and creating a more sustainable and inclusive city. I encourage you to approve it without delay.

Sincerely,
Elizabeth Conlan
95118

Dear Commissioners,
Affordable housing is the foremost crisis facing our region, and we should welcome new homes
into our community. I am writing to express strong support for the Irvine Company’s Santa Clara Park Apartment Community at 2518 Mission College Boulevard. This project will help address Santa Clara’s housing needs while creating a sustainable and welcoming community.

The project includes 1,792 apartments, with a variety of unit sizes to serve different needs. It also dedicates 15% of the units to affordable housing—5% for very low-income households and 10% for moderate-income households—helping meet the city’s housing goals.

I am excited about the project’s open spaces, which include over 6 acres of public parks and 3 acres of private recreation areas. Features like sports courts, playgrounds, a dog park, and walking trails will benefit both residents and the community.

The development’s sustainability features are also impressive. These include solar panels, energy-efficient appliances, and systems for conserving water. Preserving 148 mature trees, including redwoods, shows the project’s commitment to the environment.

The location of the project is ideal, with access to trails, jobs, shopping, and public transit. Its connection to the San Tomas Aquino Creek Trail and proximity to major employment hubs will enhance accessibility and reduce car dependency, making it easier for residents to get around while supporting sustainable transportation options.

This project is a great step toward meeting Santa Clara’s housing needs and creating a more sustainable and inclusive city. I encourage you to approve it and help bring these benefits to our community.

Sincerely,
Kate Conley
94041

Dear Commissioners,
I am writing to express strong support for the Irvine Company’s Santa Clara Park Apartment

Community at 2518 Mission College Boulevard. This project will help address Santa Clara’s housing needs while creating a sustainable and welcoming community.

The project includes 1,792 apartments, with a variety of unit sizes to serve different needs. It also dedicates 15% of the units to affordable housing—5% for very low-income households and 10% for moderate-income households—helping meet the city’s housing goals.

I am excited about the project’s open spaces, which include over 6 acres of public parks and 3 acres of private recreation areas. Features like sports courts, playgrounds, a dog park, and walking trails will benefit both residents and the community.

The development’s sustainability features are also impressive. These include solar panels, energy-efficient appliances, and systems for conserving water. Preserving 148 mature trees, including redwoods, shows the project’s commitment to the environment.

The location of the project is ideal, with access to trails, jobs, shopping, and public transit. Its connection to the San Tomas Aquino Creek Trail and proximity to major employment hubs will enhance accessibility and reduce car dependency, making it easier for residents to get around while supporting sustainable transportation options.

This project is a great step toward meeting Santa Clara’s housing needs and creating a more sustainable and inclusive city. I encourage you to approve it and help bring these benefits to our community.

Sincerely,
Calum Brydon
94040

Dear Commissioners,
I am writing to express strong support for the Irvine Company’s Santa Clara Park Apartment

Community at 2518 Mission College Boulevard. This project will help address Santa Clara’s housing needs while creating a sustainable and welcoming community.

The project includes 1,792 apartments, with a variety of unit sizes to serve different needs. It also dedicates 15% of the units to affordable housing—5% for very low-income households and 10% for moderate-income households—helping meet the city’s housing goals.

I am excited about the project’s open spaces, which include over 6 acres of public parks and 3 acres of private recreation areas. Features like sports courts, playgrounds, a dog park, and walking trails will benefit both residents and the community.

The development’s sustainability features are also impressive. These include solar panels, energy-efficient appliances, and systems for conserving water. Preserving 148 mature trees, including redwoods, shows the project’s commitment to the environment.

The location of the project is ideal, with access to trails, jobs, shopping, and public transit. Its connection to the San Tomas Aquino Creek Trail and proximity to major employment hubs will enhance accessibility and reduce car dependency, making it easier for residents to get around while supporting sustainable transportation options.

This project is a great step toward meeting Santa Clara’s housing needs and creating a more sustainable and inclusive city. I encourage you to approve it and help bring these benefits to our community.

Sincerely,
Michael Tessaro
95127

Dear Commissioners,
I am writing to express strong support for the Irvine Company’s Santa Clara Park Apartment

Community at 2518 Mission College Boulevard. This project will help address Santa Clara’s housing needs while creating a sustainable and welcoming community.

The project includes 1,792 apartments, with a variety of unit sizes to serve different needs. It also dedicates 15% of the units to affordable housing—5% for very low-income households and 10% for moderate-income households—helping meet the city’s housing goals.

I am excited about the project’s open spaces, which include over 6 acres of public parks and 3 acres of private recreation areas. Features like sports courts, playgrounds, a dog park, and walking trails will benefit both residents and the community.

The development’s sustainability features are also impressive. These include solar panels, energy-efficient appliances, and systems for conserving water. Preserving 148 mature trees, including redwoods, shows the project’s commitment to the environment.

The location of the project is ideal, with access to trails, jobs, shopping, and public transit. Its connection to the San Tomas Aquino Creek Trail and proximity to major employment hubs will enhance accessibility and reduce car dependency, making it easier for residents to get around while supporting sustainable transportation options.

This project is a great step toward meeting Santa Clara’s housing needs and creating a more sustainable and inclusive city. I encourage you to approve it and help bring these benefits to our community.

Sincerely,
Janet Holt
94024

Dear Commissioners,
I am writing to express strong support for the Irvine Company’s Santa Clara Park Apartment

Community at 2518 Mission College Boulevard. This project will help address Santa Clara’s housing needs while creating a sustainable and welcoming community.

The project includes 1,792 apartments, with a variety of unit sizes to serve different needs. It also dedicates 15% of the units to affordable housing—5% for very low-income households and 10% for moderate-income households—helping meet the city’s housing goals.

I am excited about the project’s open spaces, which include over 6 acres of public parks and 3 acres of private recreation areas. Features like sports courts, playgrounds, a dog park, and walking trails will benefit both residents and the community.

The development’s sustainability features are also impressive. These include solar panels, energy-efficient appliances, and systems for conserving water. Preserving 148 mature trees, including redwoods, shows the project’s commitment to the environment.

The location of the project is ideal, with access to trails, jobs, shopping, and public transit. Its connection to the San Tomas Aquino Creek Trail and proximity to major employment hubs will enhance accessibility and reduce car dependency, making it easier for residents to get around while supporting sustainable transportation options.

This project is a great step toward meeting Santa Clara’s housing needs and creating a more sustainable and inclusive city. I encourage you to approve it and help bring these benefits to our community.

Sincerely,
Eugene Toh
95050

Dear Commissioners,
I am writing to express strong support for the Irvine Company’s Santa Clara Park Apartment

Community at 2518 Mission College Boulevard. This project will help address Santa Clara’s housing needs while creating a sustainable and welcoming community.

The project includes 1,792 apartments, with a variety of unit sizes to serve different needs. It also dedicates 15% of the units to affordable housing—5% for very low-income households and 10% for moderate-income households—helping meet the city’s housing goals.

I am excited about the project’s open spaces, which include over 6 acres of public parks and 3 acres of private recreation areas. Features like sports courts, playgrounds, a dog park, and walking trails will benefit both residents and the community.

The development’s sustainability features are also impressive. These include solar panels, energy-efficient appliances, and systems for conserving water. Preserving 148 mature trees, including redwoods, shows the project’s commitment to the environment.

The location of the project is ideal, with access to trails, jobs, shopping, and public transit. Its connection to the San Tomas Aquino Creek Trail and proximity to major employment hubs will enhance accessibility and reduce car dependency, making it easier for residents to get around while supporting sustainable transportation options.

This project is a great step toward meeting Santa Clara’s housing needs and creating a more sustainable and inclusive city. I encourage you to approve it and help bring these benefits to our community.

Sincerely,
Dan Kletter
94043

Dear Commissioners,
I am writing to express strong support for the Irvine Company’s Santa Clara Park Apartment Community
at 2518 Mission College Boulevard. This project will help address Santa Clara’s housing needs while creating a sustainable and welcoming community.

The project includes 1,792 apartments, with a variety of unit sizes to serve different needs. It also dedicates
15% of the units to affordable housing—5% for very low-income households and 10% for moderate-income households—helping meet the city’s housing goals.

I am excited about the project’s open spaces, which include over 6 acres of public parks and 3 acres of private
recreation areas. Features like sports courts, playgrounds, a dog park, and walking trails will benefit both residents and the community.

The development’s sustainability features are also impressive. These include solar panels, ener
gy-efficient appliances, and systems for conserving water. Preserving 148 mature trees, including redwoods, shows the project’s commitment to the environment.

The location of the project is ideal, with access to trails, jobs, shopping, and public transit. Its connection
to the San Tomas Aquino Creek Trail and proximity to major employment hubs will enhance accessibility and reduce car dependency, making it easier for residents to get around while supporting sustainable transportation options.

This project is a great step toward meeting Santa Clara’s housing needs and creating a more sustainable
and inclusive city. I encourage you to approve it and help bring these benefits to our community.

Sincerely,
Savita Nataraj

Dear Commissioners,
I am writing to express strong support for the Irvine Company’s Santa Clara Park Apartment Community at 2518 Mission College Boulevard. This project will help address Santa Clara’s housing needs while creating a sustainable and welcoming community.

The project includes 1,792 apartments, with a variety of unit sizes to serve different needs. It also dedicates 15% of the units to affordable housing—5% for very low-income households and 10% for moderate-income households—helping meet the city’s housing goals.

I am excited about the project’s open spaces, which include over 6 acres of public parks and 3 acres of private recreation areas. Features like sports courts, playgrounds, a dog park, and walking trails will benefit both residents and the community.

The development’s sustainability features are also impressive. These include solar panels, energy-efficient appliances, and systems for conserving water. Preserving 148 mature trees, including redwoods, shows the project’s commitment to the environment.

The location of the project is ideal, with access to trails, jobs, shopping, and public transit. Its connection to the San Tomas Aquino Creek Trail and proximity to major employment hubs will enhance accessibility and reduce car dependency, making it easier for residents to get around while supporting sustainable transportation options.

This project is a great step toward meeting Santa Clara’s housing needs and creating a more sustainable and inclusive city. I encourage you to approve it and help bring these benefits to our community.

Sincerely,
Jose Medeiros

I am writing to express strong support for the Irvine Company’s Santa Clara Park Apartment Community at 2518 Mission College Boulevard. This project will help address Santa Clara’s housing needs while creating a sustainable and welcoming community.

The project includes 1,792 apartments, with a variety of unit sizes to serve different needs. It also dedicates 15% of the units to affordable housing—5% for very low-income households and 10% for moderate-income households—helping meet the city’s housing goals.

I am excited about the project’s open spaces, which include over 6 acres of public parks and 3 acres of private recreation areas. Features like sports courts, playgrounds, a dog park, and walking trails will benefit both residents and the community.

The development’s sustainability features are also impressive. These include solar panels, energy-efficient appliances, and systems for conserving water. Preserving 148 mature trees, including redwoods, shows the project’s commitment to the environment.

The location of the project is ideal, with access to trails, jobs, shopping, and public transit. Its connection to the San Tomas Aquino Creek Trail and proximity to major employment hubs will enhance accessibility and reduce car dependency, making it easier for residents to get around while supporting sustainable transportation options.

This project is a great step toward meeting Santa Clara’s housing needs and creating a more sustainable and inclusive city. I encourage you to approve it and help bring these benefits to our community.

You don't often get email from Learn why this is important From: Elizabeth Elliott
To: Jason Silva
Cc: Nimisha Agrawal; Lesley Xavier; Lucy Garcia
Subject: PMM FW: New eComment for Planning Commission on 2025-02-19 6:00 PM Date: Tuesday, February 18, 2025 11:33:07 AM
Jason,
Save as PMM.

Thanks.

From:

Sent: Saturday, February 15, 2025 11:33 AM
To: Elizabeth Elliott <[email protected]>
Subject: New eComment for Planning Commission on 2025-02-19 6:00 PM City of Santa Clara
New eComment for Planning Commission on
2025-02-19 6:00 PM
Susan Hinton submitted a new eComment.

Meeting: Planning Commission on 2025-02-19 6:00 PM
Item: 2. 24-1188 PUBLIC HEARING: Action on an Addendum to the Freedom Circle Future Focus Area Plan Environmental Impact Report and Mitigation Monitoring and Reporting Program, General Plan Amendment, Rezone, and Vesting Tentative Subdivision Map for the Property Located at 2518 Mission College Boulevard to Allow the Development of 1,792 Residential Units and Associated On- and Off-Site Improvements eComment: "Flex" turf is the 'new' word for plastic turf, which likely includes another petroleum- based tire crumb or plastic or synthetic rubber layer beneath. It's a fact that mixed chemicals & plastics cannot be sustainably recycled at end-of-life (8-10 yrs) & add to the worldwide plastics burden,http://tiny.cc/PlasticClimatePlanet & to plastic in our brains, https://wapo.st/3EMnK7H .

Plus plastic heats in sunlight, so those picnic spots may not be comfy or safe. Fix this, e.g., Lippia: Phyla nodiflora
View and Analyze eComments
This email was sent from
I
Unsubscribe from future mailings
From: Elizabeth Elliott
To: Jason Silva
Cc: Lucy Garcia; Sheldon Ah Sing
Subject: PMM FW: Public comment on Irvine"s proposed Santa Clara Park Date: Wednesday, February 19, 2025 2:55:28 PM
Attachments: image001.png
image002.png
Importance: High
Please redact info and save as PMM.

Print 10 copies and put at dais
Commissioners
Lesley
Xander
Elizabeth
From: Planning Public Comment
Sent: Wednesday, February 19, 2025 2:54 PM
To:
'Betsy Megas' Planning Public Comment
<[email protected]>
Cc: Sheldon Ah Sing <[email protected]>; Lesley Xavier <[email protected]>; Alexander Abbe <[email protected]>
Subject: RE: Public comment on Irvine's proposed Santa Clara Park Good Afternoon.

This is to confirm that your email has been received in the Planning Division and that your comments will be part of the public record on this item.

Thank you,
Elizabeth Elliott | Staff Aide II
Community Development Department | Planning Division
1500 Warburton Avenue | Santa Clara, CA 95050
O: 408.615.2450 | D: 408.615.2474
www.SantaClaraCA.gov
From: Betsy Megas
Sent: Wednesday, February 19, 2025 12:07 PM
To: Planning Public Comment <[email protected] >
Subject: Public comment on Irvine's proposed Santa Clara Park I
You don't often get email from Learn why this is important To the Planning Commission:

The upcoming Santa Clara Park, the Freedom Circle development by Irvine, is basically Santa Clara Square II, bland but reasonable. I wish we'd come up with more distinctive, memorable names for these developments.

It will have the minimum amount of affordable housing, plus some "affordable-by- design" 300sqft studios, which would probably still fetch in the neighborhood of $2500– $3000/month in terms of today's prices. (For a point of reference, mail carriers around here earn $22.13/hour and could not afford such a studio on their own.)

I'd like to see more specifics behind the promises of VMT reduction. If parking will be unbundled, is the same is true at Santa Clara Square, and if so, what are they charging and how are they enforcing it? Do we have performance metrics on how efforts are working, and for how many people access the area by different modes? Trail access looks reasonable, pending Greystar doing their part, although if it were really working at Santa Clara Square, I wouldn't always be the only one at Whole Foods to arrive on a bike to a parking lot full of cars. I think it's optimistic to expect that many will make the trip from Santa Clara Park to Santa Clara Square on foot or by bike, even with the trail access complete. Please help make sure sidewalk and trail improvements and access get built and marked, with good lighting, so it's easy to find and inviting to use.

This area has the old, boxy sodium vapor street lights, with the sickly yellow light. I hope to see an upgrade to current LED standards for anything the project is touching.

It's also going to be another case of a pocket of walk- and bike ability hemmed in by big, busy streets. As soon as someone's kid has to cross Bowers, Tasman, Lafayette, or Mission College Blvd., etc., to get to school, that trip is happening in a car. In the absence of a City North plan, at best we can make sure that sidewalks and trails are connected and coordinated with adjacent projects.

Irvine plans to add a coffee shop and operate it as an amenity for residents. Now I'm wondering if there's any such opportunity for filling some of the other chronically vacant storefronts around. It might help with the chicken-and-egg situation, where nobody wants to try some of the new retail spaces because nobody's going there to shop, because there's nowhere to shop. I wonder if "seeding" some of the ground floor retail I
spaces like that could be a way to attract additional tenants.

Because this project is not directly against the creek, nobody seems to be thinking in terms of creek-adjacent things like bird-safe glass or native plantings. I've watched birds fly that far, and I've seen egrets and herons further from creeks than this site. There's certainly nothing stopping those birds from crashing into windows they can't see or carrying seeds from invasive or non-native landscape plants into wilder spaces.

I'm glad to see recycled water connections being made for landscape irrigation. It looks like the city got them most of the way there already. It would be foolish and wasteful not to connect the rest of the way.

Thank you for your consideration,
Betsy Megas

Link to the Addendum to the Freedom Circle Future Focus Area Plan Environmental Impact Report (EIR) (2022)

This document is available for review in the Community Development Department Planning Division
Resolution/ Santa Clara Park Residential Project 2518 Mission College Boulevard– Addendum to the Freedom Circle Future Focus Area EIR 1 of 5
Rev. Rev: 11/22/17
RESOLUTION NO. __________

A RESOLUTION OF THE CITY OF SANTA CLARA, CALIFORNIA

APPROVING AND ADOPT ING AN ADDENDUM TO THE

ENVIRONMENTAL IMPACT REPORT FOR THE FREEDOM

CIRCLE FUTURE FOCUS AREA PLAN / GREYSTAR PROJECT

GENERAL PLAN AMENDMENT, ANALYZING THE PROPOSED
“SANTA CLARA PARK” RESIDENTIAL DEVELOPMENT
CONSISTING OF 1,792 APARTMENT UNITS LOCATED AT 2518

MISSION COLLEGE BOULEVARD, SANTA CLARA

PLN24-00160 (General Plan Amendment and Rezone)
PLN24-00213 (Vesting Tentative Subdivision Map)
Addendum to the Future Freedom Circle Focus Area Plan
Environmental Impact Report (SCH #2020060425)

WHEREAS, on April 22, 2024, Irvine Company (“Applicant”), on behalf of Freedom Circle LLC (“Owner”) filed a development application for the 25.74-acre site located at 2518 Mission College Boulevard (APN:104-40-019), which is developed as a business park and consists of 12 two story commercial buildings with surface parking and site landscaping (“Project Site”); WHEREAS, the Owner simultaneously applied for a General Plan text amendment to add a new policy to the Freedom Circle Future Focus Area to clarify that a Planned Development rezone satisfies the requirement of a comprehensive plan; a rezone of the property from High Intensity Office and R&D (HO-RD) to Planned Development (PD); and a Vesting Tentative Subdivision Map application to allow the construction of the Santa Clara Park residential development with 1,792 apartment units in five residential buildings, associated on- and off-site improvements and

4.225 acres of public parks (“Project”), as shown on the attached Development Plans and Vesting Tentative Subdivision Map, incorporated herein by this reference; WHEREAS, an Addendum was prepared for the Freedom Circle Future Focus Area Plan / Greystar Project General Plan Amendment Environmental Impact Report (EIR) (2022) (“Addendum”) in accordance with the California Environmental Quality Act (“CEQA”); WHEREAS, the Addendum includes four refinements to 2022 EIR mitigation measures which provide clarification and detailed protocols for Santa Clara Park project -specific implementation Resolution/ Santa Clara Park Residential Project 2518 Mission College Boulevard– Addendum to the Freedom Circle Future Focus Area EIR 2 of 5
Rev. Rev: 11/22/17
of the 2022 EIR mitigation measures: one in Air Quality, two in Biological Resources, and one in Cultural Resources. No further evaluation is required, and no Sub sequent or Supplemental EIR is needed pursuant to State CEQA Guidelines Section 15162, and an EIR Addendum has therefore appropriately been prepared, pursuant to Section 15164:

WHEREAS, pursuant to CEQA Guidelines Section 15164(c), this Addendum will not be circulated for public review, but will be included in the public record file for the project approval; WHEREAS, a Mitigation Monitoring and Reporting Program (“MMRP”) has been prepared for implementation with Project development to reduce potentially significant impacts identified in the Freedom Circle Future Focus Area Plan EIR for the Project, along with the four refinements to 2022 EIR mitigation measures, which provide clarification and detailed protocols for Santa Clara Park project-specific implementation of the 2022 EIR mitigation measures; WHEREAS, on February 19, 2025, the Planning Commission held a duly noticed public hearing, at the conclusion of which, the Planning Commission unanimously recommended approval of the Addendum to EIR (2022), General Plan Amendment, Rezoning, and the Tentative Subdivision Map;
WHEREAS, on February 5, 2025, a notice of the p ublic hearing on the proposed General Plan Amendment was published in the Santa Clara Weekly, and on February 13, 2025, a notice was published in the San Jose Mercury News, for the City Council Hearing to be conducted on March 25, 2025;
WHEREAS, on February 6 and February 13, 2025, the notice of public hearing for the March 25, 2025, City Council meeting for this item was mailed to property owners within a 1,000 foot radius of the Project Site boundaries;
WHEREAS, pursuant to SCCC Section 18.146.020, on February 13, 2025, notices of the public hearing of March 25, 2025 were posted at City Hall, the Central Park Library, the Mission Branch Library, the Northside Branch Library, and on the City’s website; and Resolution/ Santa Clara Park Residential Project 2518 Mission College Boulevard– Addendum to the Freedom Circle Future Focus Area EIR 3 of 5
Rev. Rev: 11/22/17
WHEREAS, on March 25, 2025, the City Council held a duly noticed public hearing to consider the Project, Addendum to the Freedom Circle Future Focus Area EIR, MMRP, and all pertinent information in the record, during which the City Council invited and considered any, and all verbal and written testimony and evidence offered in favor of and in opposition to the Project.

NOW THEREFORE, BE IT RESOLVED BY THE CITY OF SANTA CLARA AS FOLLOWS:

1. That the City Council hereby finds that the above Recitals are true and correct and by this reference makes them a part hereof.

2. The City Council hereby finds that the proposed Project would not cause substantial changes to the previously approved Freedom Circle Future Focus Ar ea and Greystar General Plan Amendment Project, and major revisions to the EIR would not be required.

3. The City Council further finds that no substantial changes would occur with respect to the circumstances under which the previously approved Freedom Circl e Future Focus Area and Greystar General Plan Amendment Project is undertaken and, therefore, no major revisions of the EIR would be required.

4. The City Council also finds that there is no new information of substantial importance, which was not known and could not have been known with reasonable diligence at the time the EIR was certified, that shows (1) that the Project would have one or more significant effects not discussed in the EIR, (2) significant effects previously examined in the EIR would be substantially more severe than shown in the EIR, (3) mitigation measures or alternatives previously found not feasible would in fact be feasible and would substantially reduce one or more significant effects of the proposed project, but the Applicant declined to adopt the mitigation or alternative, or (4) mitigation measures or alternatives which are considerably different from those analyzed in the EIR would substantially reduc e one or more significant effects on the environment, but the Applicant declined to adopt the mitigation measure or alternative.

5. The City Council further finds that t his Addendum includes four refinements to EIR mitigation measures which provide clarifica tion and detailed protocols for Project-specific Resolution/ Santa Clara Park Residential Project 2518 Mission College Boulevard– Addendum to the Freedom Circle Future Focus Area EIR 4 of 5
Rev. Rev: 11/22/17
implementation of the EIR mitigation measures: one in Air Quality, two in Biological Resources, and one in Cultural Resources. As to those refinements, the City Council finds that the mitigation measures remain equally or more effective as originally proposed.

6. The City Council finds that n o new significant or substantially more severe significant environmental impacts have been identified compared to the EIR. Therefore, no further evaluation is required, and no Subsequent or Supplemental EIR is needed pursuant to State CEQA Guidelines Section 15162, and an EIR Addendum has therefore appropriately been prepared, pursuant to Section 15164.

7. That the City Council hereby designates the Director of Community Develo pment as the Custodian of Records for the Project, and the Planning Division at City Hall, 1500 Warburton Avenue, Santa Clara, California, is the location of the documents and other material that constitute the record of proceedings upon which this decision is based.

8. Effective date. This resolution shall become effective immediately.

I HEREBY CERTIFY THE FOREGOING TO BE A TRUE COPY OF A RESOLUTION PASSED

AND ADOPTED BY THE CITY OF SANTA CLARA, CALIFORNIA, AT A REGULAR MEETING THEREOF HELD ON THE 25TH DAY OF MARCH 2025, BY THE FOLLOWING VOTE:

AYES: COUNCILORS:

NOES: COUNCILORS:

ABSENT: COUNCILORS:

ABSTAINED: COUNCILORS:

Attachments Incorporated by Reference:

1. Development Plans

2. Vesting Tentative Subdivision Map

3. Conditions of Approval

ATTEST:

NORA PIMENTEL, MMC

ASSISTANT CITY CLERK

CITY OF SANTA CLARA
Resolution/ Santa Clara Park Residential Project 2518 Mission College Boulevard– General Plan Amendment 1 of 5 Rev. Rev: 11/22/17
RESOLUTION NO. __________

A RESOLUTION OF THE CITY OF SANTA CLARA, CALIFORNIA

APPROVING A GENERAL PLAN TEXT AMENDMENT ADDING

A POLICY TO THE FREEDOM CIRCLE FUTURE FOCUS AREA

PLAN TO CLARIFY THE REQUIREMENTS FOR PREPARING A

COMPREHENSIVE PLAN PRIOR TO ADDITIONAL

DEVELOPMENT

PLN24-00160 (General Plan Amendment and Rezone)
PLN24-00213 (Vesting Tentative Subdivision Map)
Addendum to the Future Freedom Circle Focus Area Plan
Environmental Impact Report (SCH #2020060425)

WHEREAS, on April 22, 2024, Irvine Company (“Applicant”), on behalf of Freedom Circle LLC (“Owner”) filed a development application for the 25.74-acre site located at 2518 Mission College Boulevard (APN:104-40-019), which is developed as a business park and consists of 12 two story commercial buildings with surface parking and site landscaping (“Project Site”); WHEREAS, the Owner simultaneously applied for a General Plan text amendment to add a new policy to the Freedom Circle Focus Area to clarify that a Planned Development rezone satisfies the requirement of a comprehensive plan; a rezone of the property from High Intensity Office and R&D (HO-RD) to Planned Development (PD); and a Vesting Tentative Subdivision Map application to allow the construction of Santa Clara Park residential development with 1,792 apartment units in five residential buildings, associated on- and off-site improvements and 4.225 acres of public parks (“Project”);
WHEREAS, an Addendum was prepared for the Freedom Circle Future Focus Area Plan / Greystar Project General Plan Amendment Environmental Impact Report (EIR) (2022) (the “Addendum”) in accordance with the California Environmental Quality Act (“CEQA”) and it concluded that the proposed project would not cause substantial changes to the previously approved EIR and no further environmental evaluation is required; WHEREAS, a Mitigation Monitoring and Reporting Program (“MMRP”) has been prepared for implementation with Project development to reduce potentially significant impacts identified in the Resolution/ Santa Clara Park Residential Project 2518 Mission College Boulevard– General Plan Amendment 2 of 5 Rev. Rev: 11/22/17
Freedom Circle Future Focus Area Plan EIR for the Project, along with the four refinement s to 2022 EIR mitigation measures, which provide clarification and detailed protocols for Santa Clara Park project-specific implementation of the 2022 EIR mitigation measures; WHEREAS, on February 19, 2025, the Planning Commission held a duly noticed public hearing, at the conclusion of which, the Planning Commission unanimously recommended approval of the Addendum to EIR (2022), General Plan Amendment, Rezoning, and the Tentative Subdivision Map;
WHEREAS, on February 5, 2025, a notice of the public hearing on the proposed General Plan Amendment was published in the Santa Clara Weekly, and on February 13, 2025, a notice was published in the San Jose Mercury News, for the City Council Hearing to be conducted on March 25, 2025;
WHEREAS, on February 6 and 13, 2025, the notice of public hearing for the March 25, 2025, City Council meeting for this item was mailed to property owners within a 1,000 foot radius of the Project Site boundaries;
WHEREAS, pursuant to SCCC Section 18.146.020, on February 13, 2025, notices of the public hearing of March 25, 2025 were posted at City Hall, the Central Park Library, the Mission Branch Library, the Northside Branch Library, and on the City’s website; and WHEREAS, on March 25, 2025, the City Council held a duly noticed public hearing to consider the Project, the Addendum, the MMRP, and all pertinent information in the record during which the City Council invited and considered any and all verbal and written testimony and evidence offered in favor of and in opposition to the Project.

NOW THEREFORE, BE IT RESOLVED BY THE CITY OF SANTA CLARA AS FOLLOWS:

1. That the City Council hereby finds that the above Recitals are true and correct and by this reference makes them a part hereof.

2. That the City Council finds and determines that the General Plan Amendment is in the interest of the public good for the following reasons:

Resolution/ Santa Clara Park Residential Project 2518 Mission College Boulevard– General Plan Amendment 3 of 5 Rev. Rev: 11/22/17
A. The proposed amendment is deemed to be in the public interest, in that the project provides 1,792 residential units in an urbanized area served by existing municipal services and invests in public services and infrastructure with on- and off-site improvements like a public park and complete streets along the project frontage;
B. The proposed General Plan amendment is consistent and compatible with the rest of the General Plan and any implementation programs that may be affected, in that the proposal would be in alignment with the land use designation for the site in the Freedom Circle Future Focus Area Plan, and utilizes and develops an underutilized property into an apartment community;
C. The potential impacts of the proposed amendment have been assessed and have been determined not to be detrimental to the public health, safety, or welfare, in that as proposed, it i ncludes all feasible mitigation to reduce the potential adverse environmental effects of the project to less-than-significant levels; and
D. The proposed amendment has been processed in accordance with the applicable provisions of the California Governme nt Code and the California Environmental Quality Act (CEQA), in that an Addendum to the Freedom Circle Future Focus Area Plan Environmental Impact Report and a Mitigation Monitoring and Reporting Program has been prepared.

3. That the City Council hereby amends the General Plan by adding a new Policy FC-P25 to Section 5.4.8 (“Freedom Circle Future Focus Area Goals and Policies”) of Subchapter 5.4 (“Focus Areas”) of Chapter 5 (“Goals and Policies”) to read as follows:
“FC-P25: For the 25.74-acre Santa Clara Park project located at 2518 Mission College Boulevard, a Planned Development Rezoning shall satisfy the comprehensive plan requirements of General Plan Policies 5.1.1-P8 and 5.4.7-P1 and Goal 5.4.7-G1.”

4. Effective date. This resolution shall become effective immediately.

Resolution/ Santa Clara Park Residential Project 2518 Mission College Boulevard– General Plan Amendment 4 of 5 Rev. Rev: 11/22/17

I HEREBY CERTIFY THE FOREGOING TO BE A TRUE COPY OF A RESOLUTION PASSED

AND ADOPTED BY THE CITY OF SANTA CLARA, CALIFORNIA, AT A REGULAR MEETING THEREOF HELD ON THE 25TH DAY OF FEBRUARY 2025, BY THE FOLLOWING VOTE:

AYES: COUNCILORS:

NOES: COUNCILORS:

ABSENT: COUNCILORS:

ABSTAINED: COUNCILORS:

Attachments Incorporated by Reference: None

ATTEST:

NORA PIMENTEL, MMC

ASSISTANT CITY CLERK

CITY OF SANTA CLARA

Resolution/ Santa Clara Park Residential Project 2518 Mission College Boulevard– Rezone 1 of 5 Rev. Rev: 11/22/17
RESOLUTION NO. __________

A RESOLUTION OF THE CITY OF SANTA CLARA, CALIFORNIA

APPROVING A REZONING FROM HIGH INTENSITY OFFICE

AND R & D (HO -RD) TO PLANNED DEVELOPMENT (PD) TO
ALLOW RESIDENTIAL DEVELOPMENT CONSISTING OF 1,792
APARTMENT UNITS LOCATED AT 2518 MISSION COLLEGE

BOULEVARD, SANTA CLARA

PLN24-00160 (General Plan Amendment and Rezone)
PLN24-00213 (Vesting Tentative Subdivision Map)
Addendum to the Future Freedom Circle Focus Area Plan
Environmental Impact Report (SCH #2020060425)

WHEREAS, on April 22, 2024, Irvine Company (“Applicant”), on behalf of Freedom Circle LLC (“Owner”) filed a development application for the 25.74-acre site located at 2518 Mission College Boulevard (APN:104-40-019), which is developed as a business park and consists of 12 two story commercial buildings with surface parking and site landscaping (“Project Site”); WHEREAS, the Owner simultaneously applied for a General Plan text amendment to add a new policy to the Freedom Circle Focus Area to clarify that a Planned Development rezone satisfies the requirement of a comprehensive plan; a rezone of the property from High Intensity Office and R&D (HO-RD) to Planned Development (PD); and a Vesting Tentative Subdivision Map application to allow the construction of the Santa Clara Park residential development with 1,792 apartment units in five residential buildings, associated on- and off-site improvements and 4.225 acres of public parks (“Project”), as shown on the attached Development Plans, incorporated herein by this reference;
WHEREAS, an Addendum was prepared for the Freedom Circle Future Focus Area Plan / Greystar Project General Plan Amendment Environmental Impact Report (EIR) (2022) (the “Addendum”) in accordance with the California Environmental Quality Act (“CEQA”) and it concluded that the proposed project would not cause substantial changes to the previously approved EIR and no further environmental evaluation is required; Resolution/ Santa Clara Park Residential Project 2518 Mission College Boulevard– Rezone 2 of 5 Rev. Rev: 11/22/17
WHEREAS, a Mitigation M onitoring and Reporting Program (“MMRP”) has been prepared for implementation with Project development to reduce potentially significant impacts identified in the Freedom Circle Future Focus Area Plan EIR for the Project, along with the four refinement s to 2022 EIR mitigation measures, which provide clarification and detailed protocols for Santa Clara Park project-specific implementation of the 2022 EIR mitigation measures; WHEREAS, on February 19, 2025, the Planning Commission held a duly noticed public hearing, at the conclusion of which, the Planning Commission unanimously recommended approval of the Addendum to EIR (2022), General Plan Amendment, Rezoning, and the Tentative Subdivision Map;
WHEREAS, on February 5, 2025, a notice of the public hearing on the proposed rezoning was published in the Santa Clara Weekly, and on February 13, 2025, a notice was published in the San Jose Mercury News, for the City Council Hearing to be conducted on March 25, 2025; WHEREAS, on February 6 and 13, 2025, the notice of public hearing for the March 25, 2025, City Council meeting for this item was mailed to property owners within a 1,000-foot radius of the Project Site boundaries; and
WHEREAS, pursuant to SCCC Section 18.146.020, on February 13, 2025, notices of the public hearing of March 25, 2025, were posted at City Hall, the Central Park Library, the Mission Branch Library, the Northside Branch Library, and on the City’s website; WHEREAS, on March 25, 2025, the City Council held a duly noticed public hearing to consider the Project, the Addendum, the MMRP, and all pertinent information in the record during which the Council invited and considered any and all verbal and written testimony and evidence offered in favor of and in opposition to the Project.

NOW THEREFORE, BE IT RESOLVED BY THE CITY OF SANTA CLARA AS FOLLOWS:

1. That the City Council hereby finds that the above Recitals are true and correct and by this reference makes them a part hereof.

Resolution/ Santa Clara Park Residential Project 2518 Mission College Boulevard– Rezone 3 of 5 Rev. Rev: 11/22/17

2. That the City Council hereby approves rezoning the Project Site from High Intensity Office and R&D (HO-RD) to Planned Development (PD) to allow the construction of Santa Clara Park residential development with 1,792 apartment units in five residential buildings, associated on - and off -site improvements and 4.225 acres of public park s, as shown on the attached Development Plans and conditioned as speci fied in the attached Conditions of Rezoning Approval, incorporated herein by this reference.

3. Effective date. This resolution shall become effective immediately.

I HEREBY CERTIFY THE FOREGOING TO BE A TRUE COPY OF A RESOLUTION PASSED

AND ADOPTED BY THE CITY OF SANTA CLARA, CALIFORNIA, AT A REGULAR MEETING THEREOF HELD ON THE 25TH DAY OF MARCH 2025, BY THE FOLLOWING VOTE:

AYES: COUNCILORS:

NOES: COUNCILORS:

ABSENT: COUNCILORS:

ABSTAINED: COUNCILORS:

Attachments Incorporated by Reference:

1. Development Plans

2. Conditions of Rezoning Approval

ATTEST:

NORA PIMENTEL, MMC

ASSISTANT CITY CLERK

CITY OF SANTA CLARA

Resolution/ Santa Clara Park Residential Project 2518 Mission College Boulevard– Vesting Tentative Map 1 of 5 Rev. Rev: 11/22/17
RESOLUTION NO. __________

A RESOLUTION OF THE CITY OF SANTA CLARA, CALIFORNIA

TO APPROVE A VESTING TENTATIVE SUBDIVISION MAP TO
SUBDIVIDE THE PROPERTY LOCATED AT 2518 MISSION

COLLEGE BOULEVARD, SANTA CLARA, INTO SIX LOTS

PLN24-00160 (General Plan Amendment and Rezone)
PLN24-00213 (Vesting Tentative Subdivision Map)
Addendum to the Future Freedom Circle Focus Area Plan
Environmental Impact Report (SCH #2020060425)

WHEREAS, on April 22, 2024, Irvine Company (“Applicant”), on behalf of Freedom Circle LLC (“Owner”) filed a development application for the 25.74-acre site located at 2518 Mission College Boulevard (APN:104-40-019), which is developed as a business park and consists of 12 two story commercial buildings with surface parking and site landscaping (“Project Site”); WHEREAS, the Owner simultaneously applied for a General Plan text amendment to add a new policy to the Freedom Circle Focus Area to clarify that a Planned Development rezone satisfies the requirement of a comprehensive plan; a rezone of the property from High Intensity Office and R&D (HO-RD) to Planned Development (PD), and a Vesting Tentative Subdivision Map application to allow the construction of the Santa Clara Park residential development with 1,792 apartment units in five residential buildings, associated on- and off-site improvements and 4.225 acres of public parks (“Project”), as shown on the attached Development Plans and Vesting Tentative Subdivision Map, incorporated herein by this reference; WHEREAS, pursuant to Section 17.05.210 of the Code of the City of Santa Clara (“SCCC”), a Tentative Subdivision Map shall be required for all divisions of land into five or more parcels; WHEREAS, consistent with the proposed uses under the development plan, the proposal includes the division of the site into six individual lots, as shown on the proposed Vesting Tentative Subdivision Map, attached hereto and incorporated herein by this reference; WHEREAS, on December 10, 2024, the Subdivision Committee determined that the application was cleared and that the Vesting Tentative Subdivision Map be reviewed by the Planning Resolution/ Santa Clara Park Residential Project 2518 Mission College Boulevard– Vesting Tentative Map 2 of 5 Rev. Rev: 11/22/17
Commission and the City Council in conformance with Section 17.05.300 of the SCCC as a Vesting Tentative Subdivision Map along with the Project; WHEREAS, an Addendum was prepared for the Freedom Circle Future Focus Area Plan / Greystar Project General Plan Amendment Environmental Impact Report (EIR) (2022) (the “Addendum”) in accordance with the California Environmental Quality Act (“CEQA”) and it concluded that the proposed project would not cause substantial changes to the previously approved EIR and no further environmental evaluation is required; WHEREAS, a Mitigation M onitoring and Reporting Program (“MMRP”) has been prepared for implementation with Project development to reduce potentially significant impacts identified in the Freedom Circle Future Focus Area Plan EIR for the Project, along with the four refinement s to 2022 EIR mitigation measures, which provide clarification and detailed protocols for Santa Clara Park project-specific implementation of the 2022 EIR mitigation measures; WHEREAS, on February 19, 2025, the Planning Commission held a duly noticed public hearing, at the conclusion of which, the Planning Commission unanimously recommended approval of the Addendum to EIR (2022), General Plan Amendment, Rezoning, and the Tentative Subdivision Map;
WHEREAS, on February 5, 2025, a notice of the public hearing on the proposed General Plan Amendment was published in the Santa Clara Weekly, and on February 13, 2025, a notice was published in the San Jose Mercury News, for the City Council Hearing to be conducted on March 25, 2025;
WHEREAS, on February 6 and 13, 2025, the notice of public hearing for the March 25, 2025, Planning Commission meeting for this item was mailed to property owners within a 1,000-foot radius of the Project Site boundaries;
WHEREAS, pursuant to SCCC Section 18.146.020, on February 13, 2025, notices of the public hearing of March 25, 2025, were posted at City Hall, the Central Park Library, the Mission Branch Library, the Northside Branch Library, and on the City’s website; and Resolution/ Santa Clara Park Residential Project 2518 Mission College Boulevard– Vesting Tentative Map 3 of 5 Rev. Rev: 11/22/17
WHEREAS, on March 25, 2025, the City Council held a duly noticed public hearing to consider the Project, the Addendum, the MMRP, and all pertinent information in the record during which the City Council invited and considered any and all verbal and written testimony and evidence offered in favor of and in opposition to the Project.

NOW THEREFORE, BE IT RESOLVED BY THE CITY OF SANTA CLARA AS FOLLOWS:

1. That the City Council hereby finds that the above Recitals are true and correct and by this reference makes them a part hereof.

2. Vesting Tentative Subdivision Map Findings. Pursuant to California Government Code Sections 66426 and 66428 and SCCC Section 17.05.300( h), the City Council finds and determines that:

A. The Vesting Tentative Subdivision Map is consistent with the objectives, policies, general land use and programs specified in the City’s General Plan in that the proposed Vesting Tentative Subdivision Map is to allow the development of Santa Clara Park residential development with 1,792 apartment units, and on- and off-site improvements consistent with the Freedom Circle Future Focus Area Plan, and compatible with neighboring commercial development, subject to conditions set forth in the Vesting Tentative Subdivision Map Conditions of Approval, attached hereto and incorporated by this reference. The Project proposes a density of 69.6 dwelling units per acre, consistent with the Very High Residential Density General Plan designation in the Freedom Circle Future Focus Area Plan for the Project Site, which allows residential development between 51-100 dwelling units per acre.

B. The design and improvements of the proposed subdivision are consistent with the City’s General Plan in that the Vesting Te ntative Subdivision Map would redevelop an underutilized and partially vacant property (Policy 5.3.1-P8), provides adequate landscaping and replaces trees at a 2:1 ratio (Policy 5.3.1-P10), includes sidewalks and consolidates curb cuts to minimize pedestrian/vehicle conflicts (Policies 5.3.1-P12 and P16), and provides a design that is compatible with and sensitive to neighboring residential development (Policy 5.3.1-P29).

Resolution/ Santa Clara Park Residential Project 2518 Mission College Boulevard– Vesting Tentative Map 4 of 5 Rev. Rev: 11/22/17
C. The site is physically suitable for the proposed type of development in that the Project is designed to p rovide high quality housing consistent with existing and planned development in the surrounding area.

D. This site is physically suitable for the proposed density of development in that the Project Site is located in an urbanized area and allows for red evelopment consistent with the height, uses and development that are existing and planned in the surrounding area.

E. The design of the subdivision and type of improvements are not likely to cause serious health problems in that the impacts of the proposed residential subdivision have been analyzed in the previously certified Freedom Circle Future Focus Area Plan / Greystar Project General Plan Amendment EIR, and with mitigation, most impacts related to health were determined to be less than significant. For Air Quality, at the time the EIR was prepared, it did identify a significant unavoidable impact, explaining that “it cannot be definitively known or stated at this time that all development projects occurring under implementation of the Focus Area Plan would be able to reduce potential TAC emissions to levels that are below BAAQMD thresholds.” However, at a project level, the Addendum analyzed the potential emissions from the proposed Project and determined that the impacts would be less-than-significant with the use of low-VOC architectural coatings.

F. The design of the subdivision and type of improvements are not likely to cause substantial environmental damage and will not substantially or unavoidably injure fish or wildlife or their habitat in that the Project Site is located in an urbanized setting, on a previously developed site, and includes mitigation measures, as identified in the Addendum to the EIR and MMRP, that reduce impacts to wildlife habitat to less than significant levels.

G. The design of the subdivision and type of improvements will no t conflict with easements acquired by the public at large or use of property within the proposed subdivision in that, the Project is designed to avoid encroachments and conflicts with public easements in the site design.

Resolution/ Santa Clara Park Residential Project 2518 Mission College Boulevard– Vesting Tentative Map 5 of 5 Rev. Rev: 11/22/17
H. The Vesting Tentative Subdivision Map provides, to the extent feasible, for future passive or natural heating or cooling opportunities, in that it would allow flexibility in the development standards to maximize the benefits of green building standards for site and building design.

3. Based on the findings set forth in this Resolution and the evidence in the Staff Report, the Addendum, the MMRP, and such other evidence as received at the public hearings on this matter before the City Council, the City Council hereby approves the Vesting Tentative Subdivision Map, substantially in the form on file as shown in the attached Vesting Tentative Subdivision Map and Conditions of Vesting Tentative Subdivision Map Approval, incorporated herein by this reference.

4. Effective date. This resolution shall become effective immediately.

I HEREBY CERTIFY THE FOREGOING TO BE A TRUE COPY OF A RESOLUTION PASSED

AND ADOPTED BY THE CITY OF SANTA CLARA, CALIFORNIA, AT A REGULAR MEETING THEREOF HELD ON THE 25TH DAY OF MARCH 2025, BY THE FOLLOWING VOTE:

AYES: COUNCILORS:

NOES: COUNCILORS:

ABSENT: COUNCILORS:

ABSTAINED: COUNCILORS:

Attachments Incorporated by Reference: None

ATTEST:

NORA PIMENTEL, MMC

ASSISTANT CITY CLERK

CITY OF SANTA CLARA
________________________________________________________________________________ City Council Hearing March 25, 2025 Page 1 of 24

CONDITIONS OF GENERAL PLAN AMENDMENT AND REZONING APPROVAL

PLN24-00160 and PLN24-00213 /2518 Mission College Blvd APN:104-40-019 Deemed Complete / Cleared
Project Description: Adoption of an Addendum to the to the Freedom Circle Future Focus Area Plan Environmental Impact Report and Mitigation Monitoring and Reporting Program, General Plan Amendment, Rezone, and Vesting Tentative Subdivision Map for the Property Located at 2518 Mission College Boulevard to Allow the Development of 1,792 Residential Units and Associated On- and Off-Site Improvements.

GENERAL
G1. Permit Expiration. This Permit shall automatically be revoked and terminated if not used within two years of original grant or within the period of any authorized extension thereof. The date of granting this Permit is the date this Permit is approved by the Decision-making body and the appeal period has been exhausted. The expiration date is March 25, 2027.

G2. Conformance with Plans. Prior to the issuance of Building Permit, the development of the site and all associate improvements shall conform to the approved plans on file with the Community Development Department, Planning Division. No change to the plans will be made without prior review by the Planning Division through approval of a Minor Amendment or through an Architectural Review, at the discretion of the Director of Community Development or designee. Each change shall be identified and justified in writing.

G3. Conditions on Plans. All conditions of approval for this Permit shall be reprinted and included within the first three sheets of the building permit plan sets submitted for review and approval. At all times these conditions of approval shall be on all grading and construction plans kept on the project site.

G4. Necessary Relocation of Public Facility. If relocation of an existing public facility becomes necessary due to a conflict with the developer's new improvements, then the cost of said relocation shall be borne by the developer.

G5. Indemnify and Hold Harmless. The owner or designee agrees to defend and indemnify and hold City, its officers, agents, employees, officials and representatives free and harmless from and against any and all claims, losses, damages, attorney’s fees, injuries, costs, and liabilities from any suit for damages or for equitable or injunctive relief which is filed by a third party against the City by reason of its approval of owner or designee’s project.

G6. Code Compliance. The construction permit application drawings submitted to the Santa Clara Building Division shall include an overall California Building Code analysis; proposed use and occupancy of all spaces (CBC Ch. 3), all building heights and areas (CBC Ch. 5), all proposed types of construction (CBC Ch. 6), all proposed fire and smoke protection features, including all types of all fire rated penetrations proposed (CBC Ch. 7), all proposed interior finishes fire resistance (CBC Ch. 8), all fire protec tion systems proposed (CBC Ch. 9), and all means of egress proposed (CBC Ch. 10). Noncombustable exterior wall, floor, and roof finishes are strongly encouraged. a. During construction retaining a single company to install all fire related penetrations is highly recommended.
b. The grade level lobbies shall be minimum 1-hour rated all sides and above. c. All stair shafts shall be minimum 1-hour rated.
d. All elevator shafts shall be minimum 1-hour rated.
e. All trash chute shafts shall be minimum 1-hour rated. f. Recommendation: provide minimum two trash chutes ; one for recyclables, one for trash, each trash chute to be routed down to a grade level trash collection room. g. Any trash rooms shall be minimum 1-hour rated all sides and above.

________________________________________________________________________________ City Council Hearing March 25, 2025 Page 2 of 24
G7. Building Codes as Amended. See Title 15 of the Santa Clara City Code for any amendments to the California Building Codes.

G8. Reach Codes. This project is subject to the provisions of the City of Santa Clara 2022 Reach Code, effective January 2022. See Ordinance No. 2034 and/or Title 15 of the Santa Clara City Code. a. Chapter 15.38 – Green Building Code for additional Electric Vehicle Charging requirements for new construction.

G9. Comply with all applicable codes, regulations, ordinances and resolutions.

COMMUNITY DEVELOPMENT – PLANNING DIVISION

DESIGN / PERFORMANCE– PRIOR TO BUILDING PERMIT ISSUANCE P1. Roof Mounted Mechanical Equipment. All roof mounted mechanical equipment shall be placed within a screened roof top enclosure depicted on the elevation drawings or located below the parapet level and shall not be visible from the ground at any distance from the building. Cross section roof drawings shall be provided at the building permit stage indicating the relative height of the screen wall or parapet.

Minimum screen height or parapet depth shall be five feet or greater to match the height of any proposed equipment.

P2. Tree Replacement (on-site). Trees permitted by the City for removal shall be replaced on-site at a ratio of _2:1_____. (SCC 12.35.090)
P3. Tree Replacement (Alternative Means). If the applicant is unable to meet the 2:1 ratio requirement, trees permitted by the City for removal shall be replaced at a ratio pursuant to an alternative plan approved by the Director of Community Development. (SCC 12.35.090)
P4. Construction Management Plan. The owner or designee shall submit a construction management plan addressing impacts to the public during construction activities including: showing work hours, noticing of affected businesses, construction signage, noise control, storm water pollution prevention, job trailer location, contractor parking, parking enforcement, truck hauling routes, staging, concrete pours, crane lifts, scaffolding, materials storage, pedestrian safety, and traffic control. The plan shall be subm itted to the Director of Community Development or designee for approval prior to issuance of demolition and building permits.

P5. Applicant shall install proposed crosswalk adjacent to the park located at the southern edge of the project site with enhanced pedestrian safety features, such as a raised crosswalk with flashing beacon, different surface materials for the crosswalk.

DURING CONSTRUCTION -- PRIOR TO OCCUPANCY
P6. Construction Hours. Construction activity shall be limited to the hours of 7:00 a.m. to 6:00 p.m. weekdays and 9:00 a.m. to 6:00 p.m. Saturdays for projects within 300 feet of a residential use and shall not be allowed on recognized State and Federal holidays.

P7. Construction Trash/Debris. During construction activities, the owner or designee is responsible for collection and pick-up of all trash and debris on-site and adjacent public right-of-way.

P8. Construction Parking. Off street parking is required to be available from the time of issuance of building permits until the issuance of certificate of occupancy. 448 parking spaces shall be made available. Off- street construction parking lots are required to be maintained mud-free and dustless. If the off -street construction parking lot is located on an unpaved surface, daily street sweeping of surrounding streets is required. (SCC 18.38.030)
P9. Landscape Water Conservation. The owner or designee shall ensure that landscaping installation meets City water conservation criteria in a manner acceptable to the Director of Community Development.

P10. Explore opportunities to work with the local construction labor unions. ________________________________________________________________________________ City Council Hearing March 25, 2025 Page 3 of 24

OPERATIONAL CONDITIONS
P11. Use of Garage. The owner or designee shall ensure that the garage always be maintained free and clear for vehicle parking use. It shall not be used only for storage.

P12. Landscaping Installation & Maintenance. The owner or designee shall ensure that the landscaping installed and accepted with this project shall be maintained on the site as per the approved plans. Any alteration or modification to the landscaping shall not be permitted unless otherwise approved by the Director of Community Development.

P13. Landscaping. The owner or designee shall maintain the front yard landscaping between the house and sidewalk. New landscape areas of 500 square feet or more or rehabilitated landscape of 2,500 square feet or more shall conform to the California Department of Water Efficient Landscape Ordinance.

P14. Transportation Demand Management (TDM) Program (Residential Project). The owner or designee shall implement the project TDM program that includes elements to reduce vehicle miles traveled (VMT) by 20 percent with 10% through active TDM measures per the City’s 2022 Climate Action Plan. A final TDM plan shall be submitted to the Director of Community Development or designee prior to Building Permit Final by the Planning Division. The property owner or designee shall monitor the project TDM program and submit an annual report to the Director of Community Development or designee. Monitoring and reporting requirements may be revised in the future if the minimum reduction is not achieved through the measures and programs initially implemented.

MITIGATION MEASURES
P15. Mitigation Monitoring and Reporting Program. The Mitigation Monitoring and Reporting Program (MMRP), prepared for this project in compliance with the California Environmental Quality Act (CEQA), shall be incorporated by reference as conditions of approval. The applicant shall comply with all specified mitigation measures in the timelines outlined in the project’s MMRP.

COMMUNITY DEVELOPMENT - BUILDING DIVISION

DESIGN / PERFORMANCE– PRIOR TO BUILDING PERMIT ISSUANCE BD1. Addressing. Prior to overall construction permit application, submit to the Santa Clara Building Division, 2 copies of an addressing diagram request, to be prepared by a licensed architect or engineer. The addressing diagram(s) shall include all proposed streets and all building floor plans. The addressing diagram(s) shall conform to Santa Clara City Manager Directive #5; Street Name and Building Number Changes, and Santa Clara Building Division Address Policy For Residential and Commercial Developments. The addressing diagram(s) shall indicate all unit numbers to be based off established streets, not alleys nor access-ways to garages. Allow a minimum of 10 working days for initial staff review.

Please note city staff policy that existing site addresses typi cally are retired. Provide digital pdf printed from design software, not scanned from printed paper sheet. a. Any building or structure that is demolished shall have its address retired and a new address/s shall be issued for the project.

BD2. Flood Zone. The construction permit application drawings submitted to the Santa Clara Building Division shall include a copy of the latest Federal Emergency Management Agency (FEMA) Flood Zone Map:
https://msc.fema.gov/portal/home. The project drawings shall indicate how the project complies with the Santa Clara Flood Damage Prevention Code.
a. FEMA Flood Zone map designations and requirements are based on the map in effect at date of Building Permit issuance.

BD3. Water Pollution Control. The construction permit application drawings submitted to the Santa Clara Building Division shall include Santa Clara Valley Urban Runoff Pollution Prevention Program Low Impact Development (LID) practices http://www.scvurppp-w2k.com/nd_wp.shtml . All projects that disturb more
than one acre, or projects that are part of a larger development that in total disturbs more than one acre, ________________________________________________________________________________ City Council Hearing March 25, 2025 Page 4 of 24
shall comply with the Santa Clara Valley Urban Runoff Pollution Prevention Program Best Management Practices (BMP): http://www.scvurppp-w2k.com/construction_bmp.shtml, and shall provide a Storm Water Pollution Prevention Plan (SWPPP) by a certified Qualified SWPPP Developer (QSD). All site drainage and grading permit applications submitted to the Santa Clara Building Division shall include a city of Santa Clara "C3" data form, available on this web page:
• https://www.santaclaraca.gov/our-city/departments-g-z/public-works/environmental- programs/stormwater-pollution-prevention and will be routed to a contract consultant for review.

BD4. Submittal Requirements. The overall project construction permit application shall include the geotechnical, architectural, structural, energy, electrical, mechanical, and plumbing drawings and calculations. Prior to the issuance of the overall project construction permit, a conditions of approval review meeting must be held in city hall, which meeting must be attended by the on-site field superintendent(s). The meeting will not be held without the attendance of the on-site field superintendent(s). The on-si te grading permit shall be a separate permit application to the Building Division.

DURING CONSTRUCTION – PRIOR TO OCCUPANCY
BD5. Temporary Certificates of Occupancy. Temporary Certificates of Occupancy (TCO) will not be routinely issued and will be considered on a very limited basis only when there is a clear and compelling reason for city staff to consider a TCO. A TCO will be approved only after all applicable City staff have approved in writing; Planning, P.W./ Engineering, Fire Prev., Santa Clara Water, Silicon Valley Power, and any other applicable agencies such as the Santa Clara County Health Dept., with the Building Division being the final approval of all TCO.'s.

COMMUNITY DEVELOPMENT - HOUSING DIVISION
DESIGN / PERFORMANCE – PRIOR TO BUILDING PERMIT ISSUANCE

H1. In accordance with the Santa Clara City Code chapter 17.40, this project is subject to the affordable housing requirements and impact fee for the proposed 1,792 units rental residential development.

The Applicant is required to provided at least fifteen percent (15%) of the units (268.8 units) as affordable housing for households at the following affordability levels: five percent (5%) or 75 units at fifty percent (50%) of Area Median Income (AMI) to qualify for a twenty percent (20%) density bonus, with the remaining 193.8 units offered at an average of one hundred percent (100%) of AMI. The fractional unit of 0.8, the applicant has elected to provide 194 affordable units at average of 100%AMI. Affordable units shall be reasonably dispersed throughout the project, contain the same number of bedrooms as market rate units.

They shall be comparable to the design, appearance, material and finished quality of the market rate units in the project. Affordable units will also have the same access to the project amenities and recreational facilities as market-rate units.

Prior to issuance of Building Permits, the Developer shall enter into an Affordable Housing Agreement (AHA) with the City, which will establish the affordable rents and apply all terms and covenants ensuring the prescribed affordability, subject to the satisfaction of the Director of Community Development.

Compliance with the affordable housing obligation will be memorialized in the AHA and may be subject to City Council approval. A fee of $5,868 will be required for the preparation of the AHA, due prior to its execution. Additionally, there will be an annual monitoring fee of $127 per affordable unit.

FIRE DEPARTMENT

DESIGN / PERFORMANCE—PRIOR TO BUILDING PERMIT ISSUANCE
________________________________________________________________________________ City Council Hearing March 25, 2025 Page 5 of 24
F1. Hazmat Clearance. Prior to any Building Permit issuance, Hazardous Materials Closure (HMCP) is required as applicable:  This is a permit is issued by the Santa Clara Fire Department, Fire Prevention & Hazardous Materials Division.  Hazardous materials closure plans are required for busi nesses that used, handled or stored hazardous materials.  While required prior to closing a business this is not always done by the business owner, and therefore should be part of the developer’s due diligence.  The hazardous materials closure plans demonstrate that hazardous materials which were stored, dispensed, handled or used in the facility/business are safely transported, disposed of or reused in a manner that eliminates any threat to public health and environment.

F2. Hazmat Clearance. Prior to any Building Permit Issuance, a Phase II environmental assessment is required to be submitted to CRRD for review. If hazards are present that require site mitigation, cleanup, or management of chemical contaminants in soil, soil vapor, or groundwater a separate permit from one of the regulatory agencies below will be required. The type and extent of contamination on site(s) will govern which of the regulatory agencies noted below can supervise the cleanup: Department of Toxic Substances Control (DTSC); State Water Resources Control Board; or Santa Clara County, Department of Environmental Health.

If the project intends to contract with a State or County Agency for onsite/offsite environmental remediation activities the following documentation shall be provided to the Fire Prevention & Hazardous Materials Division prior to issuance of a Building Per mit for demolition or grading: Oversight agency case number; and Oversight mangers contact name, phone number.

For smaller projects that are not moving soil at all, a Phase I environmental assessment may be adequate.

Please contact Assistant Fire Marshal Fred Chun at [email protected] for more information.

F3. Fire Flow Requirement. Prior to Building Permit Issuance, provide documentation from the City of Santa Clara Water & Sewer Department that the minimum required fire-flow can be met. Fire Department fire- flow will be based on the current California Fire Code. The most restrictiv e departments requirement shall apply.

F4. Fire Hydrants. Prior to Building Permit Issuance, building plans shall show the required number, location and distribution of fire hydrants for the buildings will be based on the current California Fire Code, Appendix C as amended. The required number of fire hydrants will be based on the fire-flow before the reduction for fire sprinklers. Both public and private fire hydrants may be required.

F5. Fire Department Access. Prior to Building Permit Issuance, a five-foot all -weather perimeter pathway around the entire perimeter of the buildings to facilitate firefighter access is required to be incorporated into the Building permit submittal.

F6. Fire Department Access. Prior to the issuance of the Building Permit, approval for fire department apparatus access roads is required. Roadways must be provided to comply with all the following requirements:
• Fire apparatus access roadways shall be provided so that the exterior walls of the first story of the buildings are located not more than 150 feet from fire apparatus access as measured by an approved route around the exterior of each building. In addition, aerial apparatus roadways must be located so aerial apparatus will have clear access to the “entire” face/sides of the building. The minimum number of sides is project- specific and depends on the building configuration, building design, occupancy, and construction type, etc. As part of Building Permit Issuance, an alternative materials, design, and methods of construction and equipment permit application will need to be submitted for review and approval incorporating applicable mitigation measures as determined by the fire department for the lack of compliance. Please note acceptable mitigation methods may have been discussed during the planning stage. Those mitigations are not guaranteed until a formal alternate means permit is submitted concurrently with the Building Plans. Conversely, an ________________________________________________________________________________ City Council Hearing March 25, 2025 Page 6 of 24
acceptable mitigation method may not have been discussed and will be evaluated under an alternate means permit at the building permit stage.
• For underpasses, garages, gates, or anything similar that a Fire apparatus is required to drive under as part of the emergency vehicle access, 16 feet vertical clearance will be required. For all other areas, the “minimum” unobstructed vertical clearance s hall not be less than 13 feet 6 inches.
or

• For all other areas, the “minimum” unobstructed vertical clearance shall not be less than 13 feet 6 inches.
• The “minimum” width of aerial roadways for aerial apparatus is 26 feet. • The minimum inside turning radius shall be 30 feet and an outside turning radius of 50 feet. • The “minimum” width of roadways for aerial apparatus is 26 feet. Aerial access roadways shall be located a minimum of 15 feet and a maximum of 30 feet from the protected building. This requirement is only applicable when Appendix D of the Fire Code is enforceable. • Overhead utility and power lines easements shall not be located over fire apparatus access roads or between the aerial fire apparatus roads and the buildings to avoid the possibility of injury and equipment damage from electrical hazards.
• Fire apparatus access roadways shall be all -weather surface(s) designed to support a gross vehicle weight of 75,000-pounds.
• Trees at full development must not exceed 30 feet in height and not impair aerials apparatus operations to sweep opposing sides of a building. Other obstructions such as site lighting, bio - retention, and architectural features are reviewed case-by -case to ensure they do not obstruct aerial and ground ladder access.
• Traffic control/calming devices are not permitted on any designated fire access roadway unless approved. Traffic calming devices are shown currently on this plan and are not allowed. The project has the option to remove them or provide pneumatic bollards to isolate the portion of the road they want for pedestrian access. A separate Fire Department permit is required for any barrier devices installed alone fire department apparatus access roads.

Prior to any Building Department Issuance, all fire department apparatus access roadways on private property are required to “be recorded” with the County of Santa Clara as Emergency Vehicle Access Easements (EVAE’s) and reviewed by the Fire Department. No other instruments will be considered as substitutions such as P.U.E, Ingress/Egress easements and/or City Right-of-Ways.

F7. Emergency Responder Radio Coverage System. Prior to Building Permit Issuance, provisions shall be made for Emergency Responder Radio Coverage System (ERRCS) equipment, including but not limited to pathway survivability in accordance with Santa Clara Emergency Responder Radio Coverage System Standard.

F8. Fire Department Access. Prior to the start of construction, roadways and water supplies for fire protection are required to be installed and made serviceable and maintained throughout the course of construction.

F9. Fire Department Access. Prior to issuance of the Building Permit, a gate permit is required to obtained. Openings for access gates located across fire apparatus access roads shall be a minimum of 20 feet of clear width. Gates shall also be provided with a minimum unobstructed vertical clearance of 16-feet. All gates installed on designated fire department access roads must be electrically automatic powered gates. Gates shall be provided with an emergency power or be of a fail -safe design, allowing the gate to be pushed open without the use of special knowledge or equipment. A Tomar Strobe Switch or 3M Opticom detector shall be installed to control the automatic gate(s) to allow emergency vehicles (e.g., fire, police, ems). Said device shall be mounted at a minimum height of eight to ten feet (8’ - 10’) above grade.
________________________________________________________________________________ City Council Hearing March 25, 2025 Page 7 of 24
F10. Alternative Means and Methods. Prior to any Building Permit issuance, an alternate means or methods permits to mitigate any code deficiency must be submitted and approved. Please submit this permit concurrently with the building plans. Please note specific mitigations may have been discussed during the planning process. None of these discussions are binding and can only be formally approved through submitting an AMMR permit. The AMMR permit is formally documenting that and still needs to be submitted. This project will require an AMMR for the following items:
a. Redwood trees remaining in place along aerial access roads. The project has been told to remove the trees, but are choosing to defer their decision to the building permit stage. b. Hose pulls are not within 150 feet of all exterior portions of the building c. Aerial access setbacks are not 15 to 30 feet on at least two sides of each building (1 short side and 1 long side). Even with the removal of the trees, aerial access setbacks will still be code deficient
F11. The Fire Department reserves the right to add or edit comments based on environmental impact reports, the CEQA process, or a Fire Department Needs Assessment.

F12. Hazmat Information. Prior to Building Permit Issuance, a Hazardous Materials Inventory Statement including refrigerants is required to be submitted and reviewed with the Building Permit if applicable.

F13. Fire Safety During Construction. Prior to Building Permit Issuance, a permit for Construction Safety & Demolition shall be submitted to the fire department for review and approval in compliance with our Construction Safety & Demolition standard.

DURING CONSTRUCTION – PRIOR TO OCCUPANCY
F14. Shared Fire Protection Features that Cross Property Lines. Prior to Building Permit Final, any EVAEs or fire protection equipment (including but not limited to fire service undergrounds, sprinkler piping, fire alarm equipment, fire pumps, ERRCS) that cross property lines or is not located on the parcel of the bui lding it serves shall have a CC&R legally recorded detailing who is responsible for maintenance and repair of the EVAE or fire protection equipment.

F15. Fire Protection Systems Before Occupancy. Prior to any Certificate of Occupancy Issuance (temporary or permanent), fire-life safety systems installations must be fully installed, functional, and approved.

F16. If traffic preemption is not currently installed at Agnew and Mission College for Station 8, the project will be responsible for installing. This will be listed as a Condition of approval.

PARKS & RECREATION DEPARTMENT

DESIGN / PERFORMANCE– PRIOR TO BUILDING PERMIT ISSUANCE PR1. Park Impact Fees. This memo assumes the Project is a subdivision and the Quimby Act provisions will apply. The project will generate an estimated 3441 residents (1.92 persons/household x 1792 units). Based on the Quimby Act standard of 3.0 acres/1000 residents, the amount of public parkland required for this Project to mitigate the impact of the new resident demand is approximately

10.323 acres. The equivalent fee due in lieu of parkland dedication is $69,986,560 (1792 units X $39,055).

PR2. The balance of fees due in-lieu of parkland dedication is $34,135,899, provided the developer dedicates in fee title to the City a 4.225-acre public park free of any encumbrances or easements, the value of which is approximately $25,150,430 and 4.222-acres of private active recreational amenity space valued at approximately $10,700,231 (50% of the value of the land). The value of the park improvements is unknown at this time. If any of the proposed acreage changes, calculations will be updated accordingly.

PR3. Final Determination of Park Impact Fees. The City recently updated the amount of fees to be paid in lieu of parkland dedication pursuant to City Code Section 17.35.040(c), based upon updated determinations of average density (persons per household) for single family and multi-family residential units, the fair market value of dedicated parkland, and the cost of parkland improvements.

The Project shall be subject to the in-lieu fees adopted by City Council Resolution on October 29, 2024, whether such fee adoption is completed prior or subsequent to the Project application being ________________________________________________________________________________ City Council Hearing March 25, 2025 Page 8 of 24
deemed complete. Developer had the right to participate in the City Council proceedings regarding the amount of fees to be paid. However, Developer waives its right to request an appraisal pursuant to SCCC 17.35.040(b)(2) with respect to the adoption of the in-lieu fees by the City Council on October 29, 2024.

PR4. Application for Credit. Calculations for credit includes 183,938 sq. ft. of active recreational amenity space. A credit of 50% of the value of the land devoted to the private recreational amenity space is eligible for credit against the requirement of land dedication or fees in-lieu thereof. That value of the credit is $10,700,231. City Code Section 17.35.070(b) states that the private amenity areas shall be devoted to active recreational uses, and Section 17.35.070(b) states that the space shall be reasonably adapted for use for recreational purposes. Many of the areas proposed in the project plans are dedicated to passive uses. The developer shall find ways to activate more of these areas.

PR5. Developer shall supply a covenant to maintain the private recreational amenity spaces to the City Attorney prior to approval of the final subdivision map for review and approval. Once approved by the City Attorney, such document shall be recorded simultaneously with the final subdivision map.

PR6. The Covenants, Conditions, and Restrictions (CC&R's) or other equivalent instrument for this project should expressly provide for the perpetual maintenance of private recreational spaces for the life of the Project.

PR7. Building Permit - Payment of In-Lieu Fees. In-lieu fees imposed under City Code 17.35 shall be due and payable to the City prior to issuance of a building permit for each dwelling unit. Final calculations will depend upon the actual number and type of units and the mix of parkland dedicated and remaining fee due, at the discretion of the City. Calculations may change if the number of units change, if any areas do not conform to City Code Chapter 17.35, and/or if the fee schedule for new residential development fees due in lieu of parkland dedication changes before this Project is deemed complete by Planning.

PR8. Per City Code Section 17.35.080, the Director of Parks and Recreation shall determine the conditions necessary to comply with the requirements for parkland dedication.

PR9. Dedicated Parkland. Public park plans are considered to be a conceptual design. The developer will work with this department to follow the public outreach, design review, and approval process, and it shall meet the Department’s “Park Amenity & Design Standards” as well as City standards for the approximately 4.225-acre neighborhood park.

PR10. The City accepts the location of the proposed neighborhood park, provided it is dedicated to the City in fee title, is free of all encumbrances and easements (i.e. UGEEs, EVAs, water, sewer, etc.), and that there are no entrances to the building from and through the park parcel. The plan sheets show private stormwater treatment management areas (i.e. biorentention basins and silva cells) for the private buildings within the proposed public park parcel and shall be relocated. Private stormwater management treatment cannot be located in the public park, and nor shall treatment measures use the public park to address private stormwater requirements.

PR11. Egress/emergency exits from the building into the park would be an acceptable exception and should be outside of the park parcel. There shall not be any ingress access from the public park parcels into the buildings. Show all building doors on the plan sheets where they exit towards the public park.

PR12. There are size discrepancies for the neighborhood park on the plan set and the Vesting Tentative Map. The Vesting Tentative Map shows a 2.73-acre parcel proposed for the public neighborhood park and the latest landscaping sheets show a 3.35-acre parcel proposed for the public neighborhood park. All plans shall be updated to reflect the correct acreage and the correct parcel lines. The park shall be a single cohesive parcel and there shall not be any private utilities crossing public park and private parcel property lines.

PR13. Provide soil reports for the public park parcel.

PR14. The public park parcel boundary line shall be a minimum of 10-feet away from the face of any building and/or any private amenities. No-build easements shall be outside of the public park parcel.

The park property lines should be a “straight line” from any building, and not follow the lines of the building. There shall be a distinct separation between private and public property. ________________________________________________________________________________ City Council Hearing March 25, 2025 Page 9 of 24
PR15. The proposed parallel parking stalls along the park on Freedom Circle have been eliminated by the developer and an onsite parking area added. All plan sheets shall be updated accordingly. There will not be additional credit for this parking lot or the parking spaces.

PR16. The park requires its own building permit, separate from the residential development, through the City’s Permitting Online Portal, Accela.

PR17. The park name will follow the City’s Naming Policy.

PR18. Developer shall construct the park and maintain the park for the life of the park at the sole cost to the Developer.

PR19. Developer will provide City with GIS/Enterprise Asset Management System (EAMS) data (CAD file) for the public park facilities. The base map and design elements/assets should meet the City data dictionary definitions for each asset.

PR20. Developer shall enter into a Park Improvement Agreement and a Park Maintenance Agreement with the City which will be submitted to City Council for approval and then recorded with the County before park construction begins.

PR21. The public park shall be dedicated to the City in fee title, not a public access easement or easement of any kind, at the sole cost of the developer, and the public park parcel reflected on the vesting tentative subdivision map.

PR22. Building Permit – Dwelling Unit Tax. A dwelling unit tax (DUT) is also due based on the number of units and additional bedroom per City Code Chapter 3.15. The Project mix includes 525 studios, 595 one-bedroom units, and 672 two-bedroom units [$15 x 1792 bedrooms) + ($5 x 672 additional bedrooms)] for a total DUT of $30,240.

See below for details:

Table 1. Computation of Parkland Dedication

Project Unit Type: Multi Fam Dwelling Quimby Act
Persons/Dwelling Type 1.92
Multi Family Project Units 1792
Total New Residents 3441
Parkland Dedication Required (acres): R/1,000 x

3.0 10.323
Equivalent In Lieu Fee $69,986,560

Table 2. Public Parkland Dedications Proposed, Service Level

Parkland Proposed Square Feet Acres Type of Dedication
Neighborhood Park 184,051 4.225 Fee Title free of any
encumbrances or easements

Total to be dedicated: 184,051 4.225
Total Proposed Dedicated Public Parkland Value: $25,150,430

Table 3. Credit for Proposed Private Onsite Park & Recreation “Active Rec Uses”

Square Feet Acres
Bldg 1: courtyard 1 - landscaped & furnished, park-like quiet area 8,042 0.1846
Bldg 1: courtyard 12 - game, fitness or sport court area 21,348 0.4901 Bldg 2: courtyard 2 - family picnic area 15,099 0.3466
Bldg 2: courtyard 3 - family picnic area 4,016 0.0922
________________________________________________________________________________ City Council Hearing March 25, 2025 Page 10 of 24
Bldg 2: pool area 1 - accessible swimming pool (min
dimensions of 42-ft by 75-ft) w adjacent deck & lawn areas 33,976 0.7800 Bldg 3: courtyard 4 - game, fitness or sport court area 2,246 0.0516 Bldg 3: courtyard 5 - family picnic area 5,845 0.1342
Bldg 3: courtyard 6 - landscaped & furnished, park-like quiet area 3,783 0.0868
Bldg 3: courtyard 7 - landscaped & furnished, park-like quiet area 2,233 0.0513
Bldg 3: courtyard 8 - family picnic area 2,651 0.0609
Bldg 3: courtyard 13 - family picnic area 33,936 0.7791 Bldg 3: fitness room - recreation center buildings & grounds 7,200 0.1653 Bldg 4: courtyard 9 - family picnic area 7,372 0.1692
Bldg 4: courtyard 10 - landscaped & furnished, park-like quiet area 1,107 0.0254
Bldg 4: pool area 2 - accessible swimming pool (min
dimensions of 42-ft by 75-ft) w adjacent deck & lawn areas 24,469 0.5617 Bldg 5: courtyard 11 - family picnic area 4,075 0.0935
Bldg 5: courtyard tbd 6,540 0.1501
Total 183,938 4.2226

Credit at 50% for private Active Recreation & Equivalent Value:

2.111 /
$10,700,231

POLICE DEPARTMENT
DURING CONSTRUCTION – PRIOR TO OCCUPANCY
PD1. A Coded Entry System is required for police access to enclosed parking lots and gated communities.

This can be accomplished with a coded key pad system or the Police Department Knox Box key system. We understand security is a prime concern for the tenants of the project, which necessitates some sort of secure building and admittance process. By having either of these secure access systems for law enforcement, it will allow us to better respond to emergency situations should they arise in the development. Contact Sergeant John Terry at 408-615-4870 or email [email protected] to obtain information on Police Knox box program.

PD2. Applicant shall contact the Santa Clara Police Department ‘Intelligence” unit (408-615-4849) for Alcohol Beverage Control (ABC) licensing review.

PD3. The developer shall meet the City of Santa Clara’s guidelines established for radio signal penetration, detailed in the Communications Department’s Public Safety Radio System Building Penetration Guidelines. The intended use of telecommunications sites shall be clearly and accurately stated in the use permit. The signal, of whatever nature, of any communications facility or system, shall in no way whatsoever interfere with or affect any police communication or police communication system.

PUBLIC WORKS DEPARTMENT - ENGINEERING

DESIGN—PRIOR TO BUILDING PERMIT ISSUANCE
E1. Site Clearance. Obtain site clearance through Public Works Department prior to issuance of Building Permit. Site clearance will require payment of applicable development fees. Other requirements may be ________________________________________________________________________________ City Council Hearing March 25, 2025 Page 11 of 24
identified for compliance during the site clearance process. Contact Public Works Department at (408) 615-3000 for further information.

E2. Easement. Obtain Council approval of a resolution ordering vacation of existing public easement(s) proposed to be abandoned, if any, through Public Works Department, and pay all appropriate fees, prior to start of construction.

E3. Subdivision Map. After City Council approval of the Tentative Map, submit the Subdivision Map, prepared by a Licensed Land Surveyor or a Registered Civil Engineer with Land Surveyor privileges to the Engineering Department. The submittal shall include a title report, clos ure calculations, and all appropriate fees.

E4. Design. The sanitary sewer (SS) discharge information (i.e., building use, square footage, point of connection to the public system, and 24-hour average and peak SS flow graphs for the peak day, showing average daily and peak daily SS flows) submitted by the developer was added to the City’s Sanitary Sewer Hydraulic Model (SSHM) to determine if there is enough SS conveyance capacity in the SS trunk system to accommodate the proposed development. The SSHM output shows that there is slight surcharging in some downstream SS trunk lines. The SSHM output may change based on pending development applications and future projects. The SSHM output does not guarantee or in any way reserves or holds SS conveyance capacity until developer has Final Approval for the project. For purposes of this condition, “Final Approval” shall mean the final vote of the City Council necessary for all entitlements to be approved, unless a legal challenge is brought to the Council decisions, in which case the Final Approval shall mean the final disposition of the legal challenge.

DURING CONSTRUCTION
E5. Encroachment Permit. All work within the public right-of-way and/or public easement, which is to be performed by the Developer/Owner, the general contractor, and all subcontractors shall be submitted within a Single Encroachment Permit to be reviewed and issued by the City Public Works Department.

Issuance of the Encroachment Permit and payment of all appropriate fees shall be completed prior to commencement of work, and all work under the permit shall be completed prior to issuance of occupancy permit.

E6. Encroachment Permit. Submit public improvement/encroachment permit plans prepared in accordance with City Public Works Department procedures which provide for the installation of public improvements directly to the Public Works Department. Plans shall be prepared by a Registered Civil Engineer and approved by the City Engineer prior to approval and recordation of final map and/or issuance of building permits.

E7. Encroachment Permit. Existing non-standard or non-ADA compliant frontage improvements shall be replaced with current City standard frontage improvements as directed by the City Engineer or his designee.

E8. Encroachment Permit. Damaged curb, gutter, and sidewalk within the public right-of-way along property’s frontage shall be repaired or replaced (to the nearest score mark) in a manner acceptable to the City Engineer or his designee. The extents of said repair or replacement within the property frontage shall be at the discretion of the City Engineer or his designee.

E9. Encroachment Permit. Owner or designee shall provide a complete storm drain study for the 10-year and 100-year storm events. The grading plans shall include the overland release for the 100-year storm event and any localized flooding areas. System improvements, if needed, will be at developer’s expense.

E10. Encroachment Permit. Construct new sanitary sewer main to connect existing sanitary sewer mains along Freedom Circle.

E11. Encroachment Permit. Sanitary sewer and storm drain mains and laterals shall be outside the drip line of mature trees or ten (10) feet clear of the tree trunk, whichever is greater, to the satisfaction of the City Engineer.

E12. Encroachment Permit. Provide root barriers when the drip line of the mature trees covers the sidewalk.

Root barriers for sidewalk protection shall be 16' long or extend to drip line of the mature tree, whichever is greater, and be 1.5' deep, and centered on trees. Root barrier s for curb and gutter protection shall be 16' long or extend to drip line of the mature tree, whichever is greater, and be 2’ deep, and centered on trees.

E13. Encroachment Permit. Existing streetlights shall be clear of proposed sidewalk, developer shall relocate as necessary.
________________________________________________________________________________ City Council Hearing March 25, 2025 Page 12 of 24
E14. Encroachment Permit. Mission College Boulevard along the project frontage has been paved (type II slurry seal). No pavement cuts are permitted per the City pavement moratorium (Ordinance No. 1998) until after December 31, 2025 . Refer to https://www.santaclaraca.gov/our -city/departments-g-z/public- works/maintenance-operations/street-maintenance/pavement-preservation-ordinance for more information.

E15. Encroachment Permit. Pavement treatment shall be 2” overlay with digouts for the full street width of Freedom Circle.

E16. Easement. Dedicate required on-site easements for any new public utilities, and/or emergency vehicle access by means of subdivision map or approved instrument at time of development.

E17. Easement. Dedicate sidewalk easements along the project frontage where public sidewalks extend into private property. Sidewalk easements are to be 1’ behind proposed back of walk where there is landscaping behind sidewalk. Sidewalk easement where hardscape is behind sidewalk is to be at back- of-walk. Cold joint is required between public sidewalk and private hardscape.

E18. Easement. Record release of interest for “Agreement for installation and maintenance of landscape improvements” (C484 P109, SC14365), “Landscape improvement and maintenance easement” (C992 P12, SC14388), and “Agreement for installation and maintenance of landscape i mprovements” (C631 P680, SC14388-A).

E19. Easement. Dedicate private storm water overland release easements for overland flow crossing proposed property lines.

E20. Agreement. If requested, owner or designee shall prepare and submit for City approval a maintenance plan for all sidewalk, curb and gutter, landscaping and irrigation system improvements installed within the public right-of-way prior to encroachment permit issuance. Such plan shall include at a minimum, maintenance requirements for trees and shrubs, in acknowledgement of developer’s/property owner’s obligation under Chapter 12.30 and 17.15.

E21. Building Permit. File letter of map amendment/revision with FEMA for portions of proposed structure within flood zone AH.

PUBLIC WORKS DEPARTMENT - STORMWATER

DESIGN / PERFORMANCE—PRIOR TO BUILDING PERMIT ISSUANCE
ST1. Final Stormwater Management Plan. Prior to City’s issuance of Building or Grading Permits, the applicant shall develop a Final Stormwater Management Plan, update the C.3 Data Form, the Special Project Narratives and Worksheet (as appropriate), and an Erosion and Sediment Control Plan.

ST2. 3rd Party Review of Final Stormwater Management Plan. The Final Stormwater Management Plan and all associated calculations shall be reviewed and certified by a qualified 3rd party consultant from the SCVURPPP List of Qualified Consultants, and a 3rd party review letter (on design) shall be submitted with the Plan.

ST3. Notice of Intent. For project that disturbs a land area of one acre or more, the applicant shall provide a copy of the Notice of Intent (NOI) with WDID number for coverage under the State Construction General Permit. Active projects with NOI will be inspected by the City once per month during the wet season (October – April).

ST4. Best Management Practices. The applicant shall incorporate Best Management Practices (BMPs) into construction plans and incorporate post-construction water runoff measures into project plans. Include the SCVURPPP Countywide Construction BMPs Plan Sheet with the plans. Applicant to add Source control measures with designations from C.3 stormwater handbook, Appendix H.

ST5. C.3 Treatment Facilities Construction Notes. Include the C.3 Treatment Facilities Construction Notes on the Improvement Plans and/or Stormwater Control Plans.

ST6. Decorative & Recreational Water Features. Decorative and recreational water features such as fountains, pools, and ponds shall be designed and constructed to drain to the sanitary sewer system only.

ST7. Small Projects. For single-family homes and other small projects that create and/or replace 2,500 – 10,000 square feet of impervious surface area, the applicant shall implement at least one of the following site design measures:
a. Direction of roof runoff into cisterns or rain barrels ________________________________________________________________________________ City Council Hearing March 25, 2025 Page 13 of 24
b. Direction of roof, sidewalk, walkway, patio, driveway, or parking lot runoff onto vegetated areas c. Construction of sidewalks, walkways, patios, bike lanes, driveways, and parking lots with permeable surfaces
Plans shall specify which site design measures are selected for the project and show the direction of flow from impervious surfaces to the selected site design measures. All measures shall meet the design criteria in the 2016 C.3. Stormwater Handbook, Appendix K: Standard Specifications for Lot-Scale Measures for Small Projects.

ST8. Interior Floor Drains. Interior floor drains shall be plumbed to the sanitary sewer system and not connected to the City’s storm drain system.

ST9. Trash Enclosure Floor Drains. Floor drains within trash enclosures shall be plumbed to the sanitary sewer system and not connected to the City’s storm drain system.

ST10. Architectural Copper. The use of architectural copper is prohibited.

DURING CONSTRUCTION OR OPERATION
ST11. Biotreatment Soil Media. Applicant shall install biotreatment soil media that meets the minimum specifications as set forth in the SCVURPPP C.3 Stormwater Handbook. If percolation rate test of the biotreatment soil mix is not performed on-site, a certification letter from the supplier verifying that the soil meets the specified mix (the date of such document shall not be older than 3 months).

ST12. Stormwater Control Measure Inspection. At critical construction phases, all stormwater control measures shall be inspected for conformance to approved plans by a qualified 3 rd party consultant from the SCVURPPP List of Qualified Consultants.

ST13. Inspections. Permeable Pavement, Media Filter vaults, and Trash Full Capture Devices shall be inspected by a 3 rd party reviewer and/or manufacturer representative for conformance with the details and specifications of the approved plans. All new pervious concrete and porous asphalt pavements should have a minimum surface infiltration rate of 100 in./hr. as described in the SCVURPPP C.3 Handbook. A map displaying the number, location and details of full trash capture devices shall be prepared as an attachment to the Operations and Maintenance (O&M) Agreement with the City.

ST14. Stormwater Treatment Facilities. Stormwater treatment facilities must be designed, installed, and maintained to achieve the site design measures throughout their life in accordance to the SCVRUPPP C.3 Stormwater Handbook (Chapter 6 and Appendix C).

ST15. Amendments to Operation & Maintenance Agreement. Any site design measures used to reduce the size of stormwater treatment measures shall not be installed for the project without the written approval from the City, installing the corresponding resizing of other stormwater treatment measures and an amendment of the property’s O&M Agreement.

ST16. Stormwater Pollution Prevention Messaging. Developer shall install an appropriate stormwater pollution prevention message such as “No Dumping – Flows to Bay” on any storm drains located on private property.

ST17. Outdoor Storage Areas. All outdoor equipment and materials storage areas shall be covered and/or bermed, or otherwise designed to limit the potential for runoff to contact pollutants.

PRIOR TO FINAL OF BUILDING PERMIT
ST18. As-Built Drawings. As-Built drawing shall be submitted to the Public Works Department.

ST19. 3
rd Party Concurrence Letter. 3rd Party concurrence letter on the C.3 facilities construction shall be submitted to the Public Works Department. The letter shall be prepared by a 3rd party consultant from the SCVURPPP List of Qualified Consultants. The City reserves the right to review the 3 rd party inspection report on the C.3 stormwater facility installation.

ST20. Final C.3 Inspection. Applicant shall schedule and City shall conduct a final C.3 inspection.

ST21. Operation & Maintenance Agreement. The property owner shall enter into an Operation and Maintenance (O&M) Agreement with the City for all installed stormwater treatment measures and full trash capture devices in perpetuity. Applicants should contact Public Works Dept. - Environmental Services at (408) 615-3080 or [email protected] for assistance completing the Agreement. For more information and to download the most recent version of the O&M Agreement, visit the City’s ________________________________________________________________________________ City Council Hearing March 25, 2025 Page 14 of 24
stormwater resources website at http://santaclaraca.gov/stormwater. Inspection of permeable pavement, media filter vaults and full trash capture devices is to be done annually by December 31 of each year.

PUBLIC WORKS DEPARTMENT - TRANSPORTATION

DESIGN—PRIOR TO BUILDING PERMIT ISSUANCE
TR1. Design. A transportation impact analysis is not required as the project is covered under the Freedom Circle Focus Area Plan TIA.

TR2. Design. A VMT analysis is not required as the project meets the criteria for a transit priority project.

However, should the provided number of parking stalls for the project exceed the amount required by City code, a VMT analysis will be required.

DURING CONSTRUCTION
TR3. Encroachment Permit. Project shall be responsible for implementing the improvements, if any, identified from the traffic operations analysis.

TR4. Encroachment Permit. Applicant shall install proposed crosswalk adjacent to the park located at the southern edge of the project site such that it is not located along a horizontal bend along Freedom Circle roadway and shall include safety features such as a raised crosswalk with flashing beacon.

TR5. Encroachment Permit. This project triggers improvements at the intersection of Freedom Circle (west)/Mission College based on findings per the Freedom Circle Focus Area Plan TIA. Based on the results of the requested traffic operations analysis, the applicant shall design and construct the following:

Freedom Circle (west)/Mission College – Add an eastbound right-turn lane; Remove west leg crosswalk; Relocate bus stops to the east side of the intersection; Restripe south leg (NB approach) with 1 left-turn, 1 left-turn/through, 1 right-turn lane; Make north leg and south leg split phase; Convert Hichborn Dr. to 2-way flow and add a signal at Great America Parkway. The signal at Great America/Hichborn must allow for left and right turns in and out. Provide connection to the existing fiber trunk along Great America Parkway and retime signals along Great America Parkway, i.e., synchronize signals, from Mission College to US 101 SB Ramps.

Such improvement may be subject to a reimbursement agreement for the portion of the cost of the improvements in excess of the construction costs required for the subdivision. The reimbursement agreement shall be subject to approval by the City Council at the time of considering any Final Map.”

TR6. Encroachment Permit. Design and construct a 8’ Class IV Bike lane (6’ bike lane (including gutter pan) and 2’ buffer with delineators) along both sides of Freedom Circle. Provide a 50’ wide Freedom Circle roadway which includes a 8’ Class IV bike lane, 11’ travel lane, 12’ center turn lane, 11’ travel lane, and 8’ Class IV bike lane. Coordination with the Greystar applicant is advised for the required 8’ Class IV bike lane along their project frontage.

TR7. Encroachment Permit. Project shall abide by all standards and elements contained in the Freedom Circle Focus Area Plan.

TR8. Encroachment Permit. At Mission College/Agnew Rd intersection, modify traffic signal by replacing all four existing Type 1 pole with Type 15TS pole. Remove all existing signals, head, buttons, wiring, and foundations and furnish and install new.

TR9. Encroachment Permit. At Mission College/Freedom Circle (west) intersection, modify traffic signal by replacing two existing Type 1 pole with Type 15TS pole. Remove all existing signals, head, buttons, wiring, and foundations and furnish and install new.

TR10. Encroachment Permit. Reconstruct project frontage corners of Mission College/Freedom Circle (west) and Mission College/Freedom Circle (east) to be 25-foot curb radius to be in compliance with Pedestrian Master Plan Policy 2.A.5. This would require traffic signal modifications to accommodate new corner radius and curb ramps.

TR11. Encroachment Permit. Design and construct minimum 5-foot sidewalk along Mission College Boulevard and Freedom Circle project frontages.

TR12. Encroachment Permit. All proposed driveways shall be City standard ST-8. ________________________________________________________________________________ City Council Hearing March 25, 2025 Page 15 of 24
TR13. Encroachment Permit. Improvements within 10 feet of a driveway must be less than 3 feet or greater than 10 feet per City Standard Detail TR-9.

TR14. Encroachment Permit. Maintain street signage along Mission College Boulevard and Freedom Circle.

TR15. Encroachment Permit. Unused driveways in the public right-of-way shall be replaced with City standard curb, gutter, and sidewalk per City Standard Detail ST-12.

TR16. Encroachment Permit. Intersection safety lighting at the intersections of Mission College/Freedom Circle (east) and Mission College/Freedom Circle (west) shall be upgraded from HPS to LED on all four corners (if not currently LED).

TR17. Building Permit. Provide trash pickup location on-site.

TR18. Building Permit. Provide loading/unloading zone on-site.

TR19. Building Permit. Residential and Non-residential Class I bicycle parking spaces and Class II bicycle parking spaces shall be provided per the requirements in the adopted Santa Clara Zoning Code Update.

Bicycle parking, as defined in Santa Clara Municipal Code 18.74.075, sh all be conveniently accessible from the street, within 200 feet of a building entrance and/or highly visible area.

TR20. Fees. Prior to building permit occupancy, project shall pay fair share traffic fees in the amount of $410,660 for intersection improvements identified in the Freedom Circle Focus Area Plan TIA including at:
o Lawrence Expressway/Tasman Drive
o Lawrence Expressway/Lakehaven Drive
o Lawrence Expressway/US 101 SB Ramps
o Lawrence Expressway/Arques Avenue
o Great America Parkway/Patrick Henry Drive
o Patrick Henry Drive/Tasman Drive
o Old Ironsides Drive/Tasman Drive
o Great America Parkway/Great America Way
o Freedom Circle (east)/Mission College Boulevard
o Mission College Boulevard/Montague Expressway
o San Tomas Expressway/El Camino Real
o San Tomas Expressway/Scott Boulevard
o Lick Mill Boulevard/Tasman Drive
o Lafayette Street/Agnew Road
o Bowers Avenue/Central Expressway
o Scott Boulevard/Central Expressway
o Lafayette Street/Central Expressway
o De La Cruz Boulevard/Central Expressway
o Agnew Road/Montague Expressway
o Zanker Road/Montague Expressway
o North 1st Street/Montague Expressway
o Lawrence Expressway/Monroe Street
o Lawrence Expressway/Pruneridge Avenue
o Kiely Boulevard/Benton Street
o Kiely Boulevard/Homestead Road

STREETS DIVISION
Right of Way Landscape

DESIGN/PERFORMANCE PRIOR TO ISSUANCE OF BUILDING PERMIT L1. Tree Preservations Specifications. Include City of Santa Clara Tree Preservation/ City Arborist specifications on all improvement plans.

L2. Mature Trees. Identify existing mature trees to be maintained. Prepare a tree protection plans for review and approval by the City prior to any demolition, grading or other earthwork in the vicinity of existing trees on the site.

L3. Tree Replacement. 2:1 tree replacement ratio required for all trees removed from the right-of-way.

DURING CONSTRUCTION OR OPERATION
________________________________________________________________________________ City Council Hearing March 25, 2025 Page 16 of 24
L4. No Public Root Cutting. No cutting of any part of public, including roots, shall be done without securing prior approval of the City Arborist. Tree trimming/removal shall be done in accordance to the City of Santa Clara Tree Preservation/City Arborist specifications and with direct supervision of a certified arborist (Certification of International Society of Arboriculture).

PRIOR TO FINAL OF BUILDING PERMIT
L5. In Lieu Fee. If 2:1 replacement ratio cannot be met for removal of right of way landscape trees, tree planting fee must be paid prior to building permit final.

Solid Waste

DESIGN/PERFORMANCE PRIOR TO ISSUANCE OF BUILDING PERMIT SW1. Post-Construction Solid Waste Generation Estimation and Collection Form. The applicant shall complete and provide the Post-Construction Solid Waste Generation Estimation and Collection Form, which includes the estimation of trash and recycling materials generated from the project. Use the City’s Solid Waste Guidelines for New and Redevelopment Projects as specified by the development type.

Contact the Public Works Department at [email protected] or (408) 615-3080 for more information.

SW2. Site Plan. The applicant shall provide a site plan showing all proposed locations of solid waste containers, chutes, compactors, compactor access, and trash enclosures and trash staging areas. The site plan shall show the route or access for trash and recycling collectors (trucks) including vertical clearance, turning radius and street/alley widths. All plans shall comply with the City’s Solid Waste Guidelines. Solid metal roof, gates and a trench drain shall be installed within the trash enclosure and connected to the on-site sewer system. Ceiling height for compactor room shall be no less than 23 feet high. Roll up door to compactor room shall be no less than 21 feet. Vehicle shall have the ability to back straight in to compactor location.

SW3. Construction Waste Diversion. For projects that involve construction, demolition, or renovation of 5,000 square feet or more, the applicant shall comply with City Code Section 8.25.285 and recycle or divert at least sixty five percent (65%) of materials generated for discard by the project during demolition and construction activities. No building, demolition, or site development permit shall be issued unless and until applicant has submitted a construction and demolition debris materials check-off list. Applicant shall create a Waste Management Plan and submit, for approval, a Construction and Demolition Debris Recycling Report through the City’s online tracking tool at http://santaclara.wastetracking.com/ .

SW4. Authorized Service Haulers. This project is subject to the City’s Accumulation, Transportation and Disposal of Solid Waste Ordinance (Chapter 8.25 of the Municipal Codes), which requires the handling and disposal of waste by authorized service haulers. Insert the General Notes for the Construction & Demolition (C&D) Waste Management into construction plans in accordance with the City’s municipal codes prior to the issuance of a Building or Grading permit. Provide the Green Halo waste online tracking number to Building staff prior to the issuance of a demolition or building permit.

SW5. Exclusive Franchise Hauling Area. Project applicant shall contact the Public Works Department, Street Maintenance Division at (408) 615-3080 to verify if the property falls within the City’s exclusive franchise hauling area. If so, the applicant is required to use the City’s exclusive franchise hauler and rate structure for any hired debris boxes. Prior to the issuance of a Public Works clearance, the project applicant shall complete and sign the Construction and Demolition (C&D) / Waste Management Rules and Regulations Form.

DURING CONSTRUCTION OR OPERATION
SW6. Waste Generation Tracking. Applicant to track all waste generated and upload debris tags to GreenHalo for City staff review.

PRIOR TO FINAL OF BUILDING PERMIT
SW7. Weight Tickets. Prior to obtaining a Temporary or Final Certificate of Occupancy, individual weight tickets for all materials generated for discard or reuse by the project during demolition and construction ________________________________________________________________________________ City Council Hearing March 25, 2025 Page 17 of 24
activities shall be uploaded to Green Halo and submitted for review and approval by Environmental Services. At a minimum two (2) weeks review time is required.

SILICON VALLEY POWER

GENERAL
SVP1. Applicant Design Process available to Developer to expedite distribution electric substructure design.

SVP2. SVP Equipment Clearances:
a. Access Doors: Ten (10) foot minimum clearance in front of equipment access doors. b. Pad Sides: Five (5) foot minimum clearance from pad on sides without access doors. c. Truck Access: Eighteen (18) foot minimum width on one side of the equipment pad for truck access.
d. Barrier pipes: (on sides accessible to vehicles)
i. Thirty (30) inches from equipment sides.
ii. Forty-Eight (48) inches in front of access doors. (use removable bollards) SVP3. SVP Conduit Clearances:
a. Longitudinal: Five (5) foot minimum between new conduits/piping and existing/proposed SVP conduits.
b. Vertical: Twelve (12) inch minimum between new conduit/pipes perpendicular to existing SVP conduits.
c. Poles/Posts: Three (3) foot six (6) inches clearance required from poles (electrolier, guy stub, service clearance, self-supporting steel, and light poles), except for riser conduits. This is reduced to a three (3) foot minimum for posts (signposts, barrier pipes, bollards, fence posts, and other similar posts).
d. Structures: Five (5) foot minimum is required from walls, footings, retaining walls, landscape planter, or similar permanent structures.
e. Subsurface Facilities: Five (5) foot minimum from new splice boxes, pull boxes, manholes, vaults, or similar subsurface facilities.
f. Fire Hydrant: Five (5) foot minimum from fire hydrant thrust block. (Extends 5 feet on either side of the hydrant in line with the radial water pipe connected to the hydrant).

SVP4. SVP Vault/Manhole Clearances:
a. Ten (10) foot minimum between adjacent Vaults or Manholes. b. Three (3) foot minimum from face of curb. (bollards required for vaults).

SVP5. SVP Guy Anchor Clearances: Five (5) foot minimum clearance is required between the center of anchor line and any excavation area.

SVP6. Tree Clearances:
a. Conduits: Five (5) foot minimum to tree root barrier or other subsurface wall or structure. b. Equipment: Five (5) foot minimum to tree root barrier. The tree canopy drip line cannot be over the SVP equipment.
c. Subsurface Facilities: Five (5) foot minimum to any electric department facilities. Any existing trees in conflict will have to be removed.
d. Easements: No trees shall be planted in SVP’s U.G.E.E or P.U. E’s.

SVP7. Transformer & Switch Placement: these devices and pads may only be located outdoors. Clearances to buildings are defined in UG1225. All projects are to assume mineral oil fluid, unless otherwise approved by SVP.

SVP8. SVP Standards. Reference the listed SVP standards. All requirements of any applicable standard will apply:
a. UG1000 - Installation of Underground Substructures by Developers b. UG1250 – Encroachment Permit Clearances from Electric Facilities ________________________________________________________________________________ City Council Hearing March 25, 2025 Page 18 of 24
c. UG0339 – Remote Switch Pad
d. OH1230 – Tree Clearances from Overhead Electric Lines e. SD1235 – Tree Planting Requirements Near Underground Electric Facilities f. UG1225 – Pad mounted Equipment Clearances and Protection g. UG0250 – High Density Residential Metering Requirements h. FO-1901 – Fiber Optic Splicing and Testing Methods
i. SVP Rules and Regulations – Latest Edition
SVP9. SVP Standards. Miscellaneous:
a. In the case of podium -style construction, all SVP facilities and conduit systems must be located on solid ground (aka “real dirt”) and cannot be supported on parking garage ceilings or placed on top of structures.
b. No splice boxes are allowed between the SVP utility connection point and the customer’s main switch board.
c. SVP does not utilize any sub-surface (below grade) devices in its system. This includes transformers, switches, etc.

SVP10. Meter Locations:
a. For condominium or apartment, all electric meters and service disconnects shall be grouped at one location, outside of the building or in a accessible utility room. If they are townhomes or single- family residences, then each unit shall have its own meter, located on the structure. A double hasp locking arrangement shall be provided on the main switchboard door(s). Utility room door(s) shall have a double hasp locking arrangement or a lock box shall be provided. Utility room door(s) shall not be alarmed.
b. All interior meter rooms at ground level are to have direct, outside access through only ONE door.

Interior electric rooms must be enclosed in a dedicated electric room and cannot be in an open warehouse or office space.

SVP11. Underground Service Entrance
a. (277/480V Service or Lower) Underground service entrance conduits and conductors shall be “privately” owned, maintained, and installed per City Building Inspection Division Codes to the SVP defined utility connection point.
b. (12KV Service) SVP terminates cable on the customer owned switchgear. c. No cross-parcel distribution is allowed. SVP service points must be within the parcels that they serve.

SVP12. Code Sections:
a. The Developer shall provide and install electric facilities per Santa Clara City Code chapter

17.15.210.
b. Installation of underground facilities shall be in accordance with City of Santa Clara Electric Department standard UG-1000, latest version, and Santa Clara City Code chapter 17.15.050. c. Electrical improvements (including underground electrical conduits along frontage of properties) may be required if any single non-residential private improvement valued at $200,000 or for any series of such improvements made within a three-year period (Santa Clara City Code Title 17 Appendix A (Table III)).
d. The developer shall provide the City, in accordance with current City standards and specifications, all trenching, backfill, resurfacing, landscaping, conduit, junction boxes, vaults, street light foundations, equipment pads and subsurface housings required for power distribution, street lighting, and signal communication systems, as required by the City in the development of frontage and on-site property. Upon completion of improvements satisfactory to the City, the City shall accept the work. Developer shall further install at his cost the service facilities, consisting of ________________________________________________________________________________ City Council Hearing March 25, 2025 Page 19 of 24
service wires, cables, conductors, and associated equipment necessary to connect a customer to the electrical supply system of and by the City. After completion of the facilities installed by developer, the City shall furnish and install all cable, switches, street lighting poles, luminaries, transformers, meters, and other equipment that it deems necessary for the betterment of the system (Santa Clara City Code chapter 17.15.210 (2)).

SVP13. Existing Facilities:
a. All existing SVP facilities, onsite or offsite, are to remain unless specifically addressed by SVP personnel in a separate document. It is the Developers responsibility to maintain all clearances from equipment and easements. Developer to contact SVP outside of the PCC process for clear definitions of these clearance requirements. Developers should not assume that SVP will be removing any existing facilities without detailed design drawings from SVP indicating potential removals. Simply indicating that SVP facilities are to be removed or relocated on conceptual plans does not imply that this action has been approved by SVP. b. Any relocation of existing electric facilities shall be at Developer’s expense.

SVP14. Generators: Non-Utility Generator equipment shall not operate in parallel with the electric utility, unless approved and reviewed by the Electric Engineering Division. All switching operations shall be “Open- Transition-Mode”, unless specifically authorized by SVP Ele ctric Engineering Division. A Generating Facility Interconnection Application must be submitted with building permit plans. Review process may take several months depending on size and type of generator. No interconnection of a generation facility with SVP is allowed without written authorization from SVP Electric Engineering Division.

DESIGN / PERFORMANCE – PRIOR TO ISSUANCE OF BUILDING PERMIT

SVP15. Initial Information: Applicant shall provide a site plan showing all existing utilities, structures, easements, and trees. The applicant shall also include a detailed panel schedule showing all current and proposed electric loads.

SVP16. SVP Developers Work Drawing: Applicant shall have a developers work drawing created for the site by either an SVP estimator or through the applicant design process. All SVP standards and clearance requirements as defined in the General Section of the COA’s must be met, or variance approvals must be granted by SVP. The developers’ work drawing shall include but is not limited to: SVP substructure for primary, low voltage, streetlight, and fiber facilities. SVP facilities may extend off-site to the nearest utility connection point(s) to tie-in with existing infrastructure as deemed necessary by SVP.

SVP17. Encroachment Permit: Prior to issuance of Building Permits, the applicant shall submit an encroachment permit application with an approved SVP Developers Work Drawing for construction of electric utilities that comply with the latest edition of SVP Standards and Rules and Regulations, Electric Notes, and Electric Standard Details and Specifications SVP18. Customer Switchgear: All customers’ main switchgear with SVP meters must meet EUSERC standards and be approved by SVP’s meter shop prior to ordering. Switchgear for 12KV gear must have batteries sized for 4 hours of operation, no capacitive tripping, and 2 sets of relays, CTs, & PTs for each main. All double ended switchgear with a tie breaker, must include a kirk-key interlock scheme and an SVP provided warning label for the operation of the main tiebreaker.

SVP19. AMI/Fiber Building Requirements: All projects implementing high rise metering and multi-floor infrastructure requirements shall meet the requirements outlined in UG 0250. Project may be required to take service at 277/480V to reduce the number of SVP transformers for each building.

SVP20. Cable Pulling Calculations: The project will be responsible for providing cable pulling calculations using SVP standard cable for each run of cable for the site. Conduit bends that exceed 270 degrees ________________________________________________________________________________ City Council Hearing March 25, 2025 Page 20 of 24
worth of bends or can not be pulled based on the cable pulling calculations will need to be straightened out to reduce the total bend angle of the segment.

DURING CONSTRUCTION – PRIOR TO OCCUPANCY
SVP21. Easements: Prior to the City’s issuance of Building or Grading Permits, the applicant shall provide a dedicated underground electric utility easement (U.G.E.E) around the electric onsite facilities (Not a P.U.E). The electric utility easement shall be a minimum of 10 feet wide around conduit and 5’ minimum around equipment and vault/manhole pads. Additionally, the applicant shall submit plans defining existing easements so Electric Division can verify if there are any conflicts with new proposed easements or improvements. The developer shall grant to the City, without cost, all easements and/or right of way necessary for serving the property of the developer and for the installation of utilities (Santa Clara City Code chapter 17.15.110).

SVP22. Coordination Study: For any services taken at 12KV, a coordination study will need to be conducted by the applicant prior to energizing the service.

SVP23. Customer Switchgear: All customer switchgear will be inspected on site by SVP to ensure compliance with approved switchgear drawings. Electric meters and main disconnects shall be installed per Silicon Valley Power Standard MS-G7, Rev. 2.

SVP24. Electric Facilities: Prior to the City's issuance of Occupancy, the applicant shall construct all electric utilities per the approved SVP Developers Work Drawing. SVP will inspect all electric utility installations and all other improvements encroaching on electric facilities.

SVP25. Municipal Fee’s: Prior to electric service energization, all applicable fees per the City of Santa Clara’s Municipal Fee Schedule shall be paid.

SVP26. Special Fee’s: Any developments which can’t adhere to SVP standards, resulting in non-standard installations or equipment requirements will be responsible for any costs incurred by SVP.

SVP27. System Impact Study – The project is subjected to the restrictions and fees within the system impact study issued on Oct. 22, 2024.

OPERATIONAL CONDITIONS – AFTER OCCUPANCY
SVP28. Access: SVP will require 24-hour unobstructed access to all SVP equipment, manholes, transformers, vaults, meters, etc.

WATER & SEWER DEPARTMENT

DESIGN / PERFORMANCE -- PRIOR TO ISSUANCE OF BUILDING PERMIT W1. Recycled Water Use. Pursuant to Chapter 13.15, Water, Article IV. Regulation of Recycled Water Service and Use, of the Municipal Code, the project is required to use recycled water for all non-potable uses where recycled water is made available and where provided for by Recy cled Water regulations.

This project is required to extend and connect to the City’s existing Recycled Water System.

W2. On-site Recycled Water Construction. Construction and installation of all on-site recycled water system equipment shall not begin until the Compliance Division of Water and Sewer Utilities has approved the on-site recycled water design. Please note on-site designs are generally not the same as the Building Permit plans. On-site recycled water plans require SBWR and California State Water Resources Control Board, Division of Drinking Water signatures for final approval.

W3. On-site Recycled Water Inspection. Inspections are required at all on-site recycled water systems being installed prior to backfilling trenches or cover in walls and ceilings. Request a recycled water inspection by email [email protected] or call (408) 615-2002. Please provi de the site location, SBWR project ID, and date and time preferences. These inspections are in addition to the Building Permit inspections.
a. Need to verify separations between all potable/fire lines and recycled water lines, pipe type, pipe depths, equipment types, warning lids, tags and signs.
________________________________________________________________________________ City Council Hearing March 25, 2025 Page 21 of 24
W4. Potable Water Main. The applicant shall replace the existing water main on the Mission College Boulevard frontage. This requirement may be exempt if no more than 3 services taps or cut-ins are proposed on the existing AC water main. The water main replacement shall begin and end at a valve connection and shall extend, at a minimum, the entire length of the property's frontage.

W5. Recycled Water Main. The project shall install a new 8" DIP recycled water main on Freedom Circle Blvd. extending from the south eastern intersection of Mission College Blvd. and Freedom Circle and from the north western intersection of Mission College Blvd and Freedom Circle to the furthest RW services from both intersections respectively.

W6. Encroachment Permit. Prior to issuance of Building Permits, the applicant shall submit an encroachment permit application and design plans for construction of water utilities that comply with the latest edition of the Water & Sewer Utilities Water Service and Use Rules and Regulations, Water System Notes, and Water Standard Details and Specifications. In addition, prior to the City's issuance of Occupancy, the applicant shall construct all public water utilities per the approved plans. The Water & Sewer Utilities will inspect all public water utility installations and all other improvements encroaching public water utilities.

W7. Utility Design Plans. Utility Design Plans shall indicate the pipe material and the size of existing water, recycled water and sewer main(s). The plans shall show the nearest existing fire hydrant and the two nearest existing water main line gate valves near the project area. The plans shall show meter and backflow configurations to scale and per City of Santa Clara Water & Sewer Utilities Standard Details.

Note that all new water meters and backflow prevention devices shall be located behind the sidewalk i n a landscape area. Fire hydrants should be located two feet behind monolithic sidewalk if sidewalk is present; two feet behind face of curb if no sidewalk is present, per City Std Detail 18. The plans shall provide the profile section details for utilities crossing water, sewer, or recycled water mains to ensure a 12” minimum vertical clearance is maintained.

W8. Utility Separations. Applicant shall adhere to and provide a note indicating that all horizontal and vertical clearances comply with State and local regulations. The applicant shall maintain a minimum 12” of vertical clearance at water service crossing with other utilities, and all required minimum horizontal clearances from water services: 10' from sanitary sewer utilities, 10’ from recycled water utilities, 8' from storm drain utilities, 5' from fire and other water utilities, 3' from abandoned water serv ices, 5' from gas and electric utilities, and 5’ from the edge of the propose or existing driveway. For sanitary sewer, water, and recycled water utilities, the applicant shall maintain a minimum horizontal clearance of 10' from existing and proposed trees. If applicant installs tree root barriers, clearance from tree reduces to 5' (clearance must be from the edge of tree root barrier to edge of water facilities). No structures (fencing, foundation, biofiltration swales, etc.) allowed over sanitary sewer, potable water and/or recycled water utilities and easements.

W9. Separate Services. Applicant shall submit plans showing proposed water, recycled water, sanitary sewer, and fire services connected to a public main in the public right- of-way to the satisfaction of the Director of Water & Sewer Utilities. Different types of water and recycled water use (domestic, irrigation, fire) shall be served by separate water services, each separately tapped at the water main. Tapping on existing fire service line(s) is prohibited. Approved backflow prevention device(s) are required on all potable water services.

W10. City Standard Meters and Backflows. All proposed meters and backflows for all water services shall meet the current City of Santa Clara Water & Sewer Utilities Standard Details. Plans shall show meter and backflow configurations to scale.

W11. Existing Services. The applicant must indicate the disposition of all existing water and sewer services and mains on the plans. If the existing services will not be used, then the applicant shall properly abandon these services to the main per Water & Sewer Utilities standards and install a new service to accommodate the water needs of the project. The applicant shall bear the cost of any relocation or abandonment of existing Water Department facilities required for project construction to the satisfaction of the Director of Water and Sewer Utilities.

W12. On-Site Storm Drain Treatment. Prior to issuance of Building Permit, the applicant shall submit plans showing any onsite storm water treatment system. The plan shall include a section detail of the treatment system. No water, sewer, or recycled water facilities shall be located within 5-feet of any storm water treatment system.
________________________________________________________________________________ City Council Hearing March 25, 2025 Page 22 of 24
W13. Water Usage. Prior to the issuance of Building Permits, the applicant shall provide documentation of water usage so the Water Division can verify the appropriate size of all proposed water meters. Please note that if the existing water services are incapable of supplying the water needs to the site, the existing services shall be abandoned, and new separate dedicated water services shall be provided for each use (domestic and irrigation).

W14. Landscaping. All the landscaping for the project shall comply with the California Water Conservation in Landscaping Act, Government Code Section 65591 et. seq. All plants shall be either California native or non-invasive, low water-using or moderate water-using plants. High water-using plants and nonfunctional turf are prohibited.

W15. Water Features. Prior to issuance of Building Permits, the applicant shall submit plan details for all water features (including but not limited to fountains and ponds) designed to include provisions for operating the system without City potable water supply and capable of being physically disconnected from source of potable water supply during City declared water conservation periods, to the satisfaction of the Director of the Water & Sewer Utilities. Decorative water features may be permanently connected to the City’s recycled water supply.

W16. Easements. Prior to City’s issuance of Building or Grading Permits, the applicant shall provide a dedicated water utility easement around the backflow prevention device onsite. The water utility easement for the water services and all other public water appurtenances shall be a minimum 15 feet wide and be adjacent to the public right-of-way without overlapping any public utility easement.

Additionally, the applicant shall submit plans defining existing easements so Water Division can verify if there are any conflicts with proposed easements and water utilities.

W17. Underground Fire Permit. Prior to issuance of Building Permits, applicant shall submit an underground fire permit unless otherwise waived by the Fire Department. If fire flow information is needed, applicant shall coordinate with Water and Sewer Utilities Department, for fire flow information at (408)615-2000. A dedicated fire service line, with an approved backflow prevention device, shall be used for on-site fire hydrants. Fire service lines required for commercial and industrial use shall be sized appropriately per fire flow demand and code requirements.

DURING CONSTRUCTION
W18. City Standard Meters and Backflow Installation. No meters or backflows shall be installed prior to establishment of water service account with the Municipal Services Division of the Finance Department.

The applicant shall provide a copy of the account information to the Water and Sewer Utilities Department Inspector and Meter Shop prior to installation of any meter or backflow. All meters and backflows approved for installation shall be tested prior to use. Water service connections shall not be used prior to authorization by the Water and Sewer Utilities inspector.

W19. Construction Water. This project shall use recycled water for all construction water needs for onsite and offsite construction.

W20. Water Shortage Response Actions. Pursuant to the City of Santa Clara’s Urban Water Management Plan, during times of drought or water shortage, the City implements water shortage response actions in accordance with the level of water shortage declared. All construction activities and all new irrigation connections are subject to the Water Shortage Response Actions in effect at the time of construction and connection of the irrigation service.

Water Shortage Response Actions for Stage 2 and higher include water use restrictions that limit the use of potable water such as:
a. prohibiting the installation of new potable water irrigation services. new irrigation connections, construction, and dust control.
b. restrict the use of potable water used for construction and dust control if recycled water is available.

This project is subject to all the requirements and restrictions of the Water Shortage Response Actions in place or adopted during the duration of the project. For more information, visit the City of Santa Clara Water & Sewer Utilities website at www.santaclaraca.gov/waterconservation.

PRIOR TO FINAL OF BUILDING PERMIT
________________________________________________________________________________ City Council Hearing March 25, 2025 Page 23 of 24
W21. Record Drawings. Upon completion of construction and prior to the City’s issuance of a Certificate of Occupancy, the applicant shall provide "as -built" drawings of the public water utility infrastructure prepared by a registered civil engineer to the satisfaction of the D irector of Water & Sewer Utilities Department.

W22. Conditional Releases. The applicant shall comply with all the requirements of any building permit conditional release requirements.

OPERATIONAL CONDITIONS
W23. Onsite Recycled Water Compliance. An active onsite recycled water system is a regulated system that must continuously be in compliance with all State, SBWR and City code requirements and regulations.

The applicant shall always maintain a certified Site Supervisor and prevent any cross -connections from occurring between the onsite regulated RW system and the other plumbing systems, especially the domestic water system. The Site Supervisor for this site shall work with to the Compliance Division of Water and Sewer Utilities to remain in compliance and report any changes to the regulated system.

_____________________________________
KEY:

G = General
P = Planning Division
BD = Building Division
H = Housing & Community Services Division
F = Fire Department
PR = Parks & Recreation Department
PD = Police Department
E = Engineering Division
Streets Division (Landscape, Solid Waste, and Stormwater) L = Landscape
SW = Solid Waste
ST = Stormwater
SVP = Silicon Valley Power
W = Water & Sewer Department

ACKNOWLEDGEMENT AND ACCEPTANCE OF CONDITIONS OF APPROVAL

Permittee/Property Owner

The undersigned agrees to each condition of approval and acknowledges and hereby agrees to use the project property on the terms and conditions set forth in this permit.

Signature: _________________________________________________

Printed Name: _________________________________________________

Relationship to Property: _________________________________________________ ________________________________________________________________________________ City Council Hearing March 25, 2025 Page 24 of 24

Date: _________________________________________________

Pursuant to Santa Clara City Code 18.128.100, the applicant shall return this document to the Department, properly signed and dated, within 30-days following the date of the Acknowledgement.

________________________________________________________________________________ City Council Hearing March 25, 2025 Page 1 of 11

CONDITIONS OF VESTING TENTATIVE MAP APPROVAL

PLN24-00160 and PLN24-00213 /2518 Mission College Blvd APN:104-40-019 Deemed Complete / Cleared
Project Description: Vesting Tentative Subdivision Map to divide the existing 25.74 acre parcel located at 2518 Mission College Boulevard into six lots to allow the development of 1,792 residential units and associated on- and off-site improvements. Complete / Cleared

GENERAL
G1. Subdivision Expiration. This subdivision shall automatically be revoked and terminated if not used within two years of original grant or within the period of any authorized extension thereof. The date of granting this subdivision is the date this subdivision is approved by the Decision-making body and the appeal period has exhausted. The expiration date is February 19, 2027.

G2. Conformance with Plans. The lot design on the subdivision map shall be designed in conformance with the subdivision map, as approved by the decision-making body.

G3. Conditions of Plans. All conditions of approval for this subdivision shall be reprinted and included within the first three sheets of the subdivision map sets submitted for review and approval. At all times these conditions of approval shall be on all grading and construction plans kept on the project site.

G4. Necessary Relocation of Public Facility. If relocation of an existing public facility becomes necessary due to a conflict with the developer's new improvements, then the cost of said relocation shall be borne by the developer.

G5. Indemnify and Hold Harmless. The owner or designee agrees to defend and indemnify and hold City, its officers, agents, employees, officials and representatives free and harmless from and against any and all claims, losses, damages, attorney’s fees, injuries, costs, and liabilities fr om any suit for damages or for equitable or injunctive relief which is filed by a third party against the City by reason of its approval of owner or designee’s project.

G6. Code Compliance. The construction permit application drawings submitted to the Santa Clara Building Division shall include an overall California Building Code analysis; proposed use and occupancy of all spaces (CBC Ch. 3), all building heights and areas (CBC Ch. 5), all proposed types of construction (CBC Ch. 6), all proposed fire and smoke protection features, including all types of all fire rated penetrations proposed (CBC Ch. 7), all proposed interior finishes fire resistance (CBC Ch. 8), all fire protec tion systems proposed (CBC Ch. 9), and all means of egress proposed (CBC Ch. 10). Noncombustable exterior wall, floor, and roof finishes are strongly encouraged. a. During construction retaining a single company to install all fire related penetrations is highly recommended.
b. The grade level lobbies shall be minimum 1-hour rated all sides and above. c. All stair shafts shall be minimum 1-hour rated.
d. All elevator shafts shall be minimum 1-hour rated.
e. All trash chute shafts shall be minimum 1-hour rated. f. Recommendation: provide minimum two trash chutes; one for recyclables, one for trash, each trash chute to be routed down to a grade level trash collection room. g. Any trash rooms shall be minimum 1-hour rated all sides and above.

G7. Building Codes as Amended. See Title 15 of the Santa Clara City Code for any amendments to the California Building Codes.

________________________________________________________________________________ City Council Hearing March 25, 2025 Page 2 of 11

G8. Reach Codes. This project is subject to the provisions of the City of Santa Clara 2022 Reach Code, effective January 2022. See Ordinance No. 2034 and/or Title 15 of the Santa Clara City Code. a. Chapter 15.38 – Green Building Code for additional Electric Vehicle Charging requirements for new construction.

G9. Comply with all applicable codes, regulations, ordinances and resolutions.

COMMUNITY DEVELOPMENT – PLANNING DIVISION

DESIGN / PERFORMANCE– PRIOR TO BUILDING PERMIT ISSUANCE P1. The project shall comply with the Conditions of General Plan Amendment and Rezoning approvals (PLN24-00160) and the mitigation measures identified in the CEQA Addendum prepared for the project.

P2. Developer shall prepare and submit Covenant, Conditions and Restrictions (CC&R’s) to the City for review and approval. The approved CC&Rs are to be recorded prior to the issuance of building permits and a copy is provided to the Planning Department.

P3. Tree Replacement (on-site). Trees permitted by the City for removal shall be replaced on-site at a ratio of 2:1. (SCC 12.35.090)
P4. Tree Replacement (Alternative Means). If the applicant is unable to meet the 2:1 ratio requirement, trees permitted by the City for removal shall be replaced at a ratio pursuant to an alternative plan approved by the Director of Community Development. (SCC 12.35.090)

OPERATIONAL CONDITIONS
P5. Landscaping Installation & Maintenance. The owner or designee shall ensure that the landscaping installed and accepted with this project shall be maintained on the site as per the approved plans. Any alteration or modification to the landscaping shall not be permitted unless otherwise approved by the Director of Community Development.

P6. Landscape Water Conservation. The owner or designee shall ensure that landscaping installation meets City water conservation criteria in a manner acceptable to the Director of Community Development.

P7. Landscaping. The owner or designee shall maintain the front yard landscaping between the house and sidewalk. New landscape areas of 500 square feet or more or rehabilitated landscape of 2,500 square feet or more shall conform to the California Department of Water Efficient Landscape Ordinance.

COMMUNITY DEVELOPMENT - BUILDING DIVISION

DESIGN / PERFORMANCE– PRIOR TO BUILDING PERMIT ISSUANCE BD1. Addressing. Prior to overall construction permit application, submit to the Santa Clara Building Division, 2 copies of an addressing diagram request, to be prepared by a licensed architect or engineer. The addressing diagram(s) shall include all proposed streets and all building floor plans. The addressing diagram(s) shall conform to Santa Clara City Manager Directive #5; Street Name and Building Number Changes, and Santa Clara Building Division Address Policy For Residential and Commercial Developments. The addressing diagram(s) shall indicate all unit numbers to be based off established streets, not alleys nor access-ways to garages. Allow a minimum of 10 working days for initial staff review.

Please note city staff policy that existing site addresses typi cally are retired. Provide digital pdf printed from design software, not scanned from printed paper sheet. a. Any building or structure that is demolished shall have its address retired and a new address/s shall be issued for the project.

BD2. Flood Zone. The construction permit application drawings submitted to the Santa Clara Building Division shall include a copy of the latest Federal Emergency Management Agency (FEMA) Flood Zone Map:
________________________________________________________________________________ City Council Hearing March 25, 2025 Page 3 of 11

https://msc.fema.gov/portal/home. The project drawings shall indicate how the project complies with the Santa Clara Flood Damage Prevention Code.
a. FEMA Flood Zone map designations and requirements are based on the map in effect at date of Building Permit issuance.

BD3. Water Pollution Control. The construction permit application drawings submitted to the Santa Clara Building Division shall include Santa Clara Valley Urban Runoff Pollution Prevention Program Low Impact Development (LID) practices http://www.scvurppp-w2k.com/nd_wp.shtml . All projects that disturb more
than one acre, or projects that are part of a larger development that in total disturbs more than one acre, shall comply with the Santa Clara Valley Urban Runoff Pollution Prevention Program Best Management Practices (BMP): http://www.scvurppp-w2k.com/construction_bmp.shtml, and shall provide a Storm Water Pollution Prevention Plan (SWPPP) by a certified Qualified SWPPP Developer (QSD). All site drainage and grading permit applications submitted to the Santa Clara Building Division shall include a city of Santa Clara "C3" data form, available on this web page:
• https://www.santaclaraca.gov/our-city/departments-g-z/public-works/environmental- programs/stormwater-pollution-prevention and will be routed to a contract consultant for review.

BD4. Submittal Requirements. The overall project construction permit application shall include the geotechnical, architectural, structural, energy, electrical, mechanical, and plumbing drawings and calculations. Prior to the issuance of the overall project construction permit, a conditions of approval review meeting must be held in city hall, which meeting must be attended by the on-site field superintendent(s). The meeting will not be held without the attendance of the on-site field superintendent(s). The on-si te grading permit shall be a separate permit application to the Building Division.

DURING CONSTRUCTION – PRIOR TO OCCUPANCY
BD5. Temporary Certificates of Occupancy. Temporary Certificates of Occupancy (TCO) will not be routinely issued and will be considered on a very limited basis only when there is a clear and compelling reason for city staff to consider a TCO. A TCO will be approved only after all applicable City s taff have approved in writing; Planning, P.W./ Engineering, Fire Prev., Santa Clara Water, Silicon Valley Power, and any other applicable agencies such as the Santa Clara County Health Dept., with the Building Division being the final approval of all TCO.'s.

FIRE DEPARTMENT

DURING CONSTRUCTION – PRIOR TO OCCUPANCY
F1. Shared Fire Protection Features that Cross Property Lines. Prior to Building Permit Final, any EVAEs or fire protection equipment (including but not limited to fire service undergrounds, sprinkler piping, fire alarm equipment, fire pumps, ERRCS) that cross property lines or is not located on the parcel of the building it serves shall have a CC&R legally recorded detailing who is responsible for maintenance and repair of the EVAE or fire protection equipment.

F2. The fire service line running down private street A is required to be shifted to the south side of the property line running down the street to avoid crossing property lines.

PARKS & RECREATION DEPARTMENT

DESIGN / PERFORMANCE—PRIOR TO BUILDING PERMIT ISSUANCE
PR1. The neighborhood park parcels shall be dedicated to the City in fee title and shall be free of all encumbrances and easements (i.e. private serving UGEEs, EVAs, private water, private sewer, private stormwater treatment, etc.).
________________________________________________________________________________ City Council Hearing March 25, 2025 Page 4 of 11

PR2. The grading shall be modified to prevent any stormwater overland release to flow from private parcels towards/onto public park parcels.

PR3. There shall be no entrances to the building from and through a park parcel, including into Building 4.

PR4. There shall not be any private utilities crossing public park and private parcel property lines.

PR5. The public park parcel boundary line shall be a minimum of 10-feet away from the face of any building and/or any private amenities. No-build easements shall be outside of the public park parcel. The park property lines should be a “straight line” from any building, and not follow the lines of the building. There shall be a distinct separation between private and public property.

PR6. The Covenants, Conditions, and Restrictions (CC&R's) or other equivalent instrument for this project should expressly provide for the perpetual maintenance of private recreational spaces for the life of the Project.

PUBLIC WORKS DEPARTMENT - ENGINEERING

DESIGN—PRIOR TO BUILDING PERMIT ISSUANCE
E1. Site Clearance. Obtain site clearance through Public Works Department prior to issuance of Building Permit. Site clearance will require payment of applicable development fees. Other requirements may be identified for compliance during the site clearance process. Contact Public Works Department at (408) 615-3000 for further information.

E2. Easement. Obtain Council approval of a resolution ordering vacation of existing public easement(s) proposed to be abandoned, if any, through Public Works Department, and pay all appropriate fees, prior to start of construction.

E3. Subdivision Map. After City Council approval of the Tentative Map, submit the Subdivision Map, prepared by a Licensed Land Surveyor or a Registered Civil Engineer with Land Surveyor privileges to the Engineering Department. The submittal shall include a title report, clos ure calculations, and all appropriate fees.

E4. Design. The sanitary sewer (SS) discharge information (i.e., building use, square footage, point of connection to the public system, and 24-hour average and peak SS flow graphs for the peak day, showing average daily and peak daily SS flows) submitted by the devel oper was added to the City’s Sanitary Sewer Hydraulic Model (SSHM) to determine if there is enough SS conveyance capacity in the SS trunk system to accommodate the proposed development. The SSHM output shows that there is slight surcharging in some downstream SS trunk lines. The SSHM output may change based on pending development applications and future projects. The SSHM output does not guarantee or in any way reserves or holds SS conveyance capacity until developer has Final Approval for the proje ct. For purposes of this condition, “Final Approval” shall mean the final vote of the City Council necessary for all entitlements to be approved, unless a legal challenge is brought to the Council decisions, in which case the Final Approval shall mean the final disposition of the legal challenge.

DURING CONSTRUCTION
E5. Encroachment Permit. All work within the public right-of-way and/or public easement, which is to be performed by the Developer/Owner, the general contractor, and all subcontractors shall be submitted within a Single Encroachment Permit to be reviewed and issued by the City Public Works Department.

Issuance of the Encroachment Permit and payment of all appropriate fees shall be completed prior to commencement of work, and all work under the permit shall be completed prior to issuance of occupancy permit.

E6. Encroachment Permit. Submit public improvement/encroachment permit plans prepared in accordance with City Public Works Department procedures which provide for the installation of public improvements directly to the Public Works Department. Plans shall be prepared by a Registered Civil Engineer and approved by the City Engineer prior to approval and recordation of final map and/or issuance of building permits.
________________________________________________________________________________ City Council Hearing March 25, 2025 Page 5 of 11

E7. Encroachment Permit. Existing non-standard or non-ADA compliant frontage improvements shall be replaced with current City standard frontage improvements as directed by the City Engineer or his designee.

E8. Encroachment Permit. Damaged curb, gutter, and sidewalk within the public right-of-way along property’s frontage shall be repaired or replaced (to the nearest score mark) in a manner acceptable to the City Engineer or his designee. The extents of said repair or replacement within the property frontage shall be at the discretion of the City Engineer or his designee.

E9. Encroachment Permit. Owner or designee shall provide a complete storm drain study for the 10-year and 100-year storm events. The grading plans shall include the overland release for the 100-year storm event and any localized flooding areas. System improvements, if needed, will be at developer’s expense.

E10. Encroachment Permit. Construct new sanitary sewer main to connect existing sanitary sewer mains along Freedom Circle.

E11. Encroachment Permit. Sanitary sewer and storm drain mains and laterals shall be outside the drip line of mature trees or ten (10) feet clear of the tree trunk, whichever is greater, to the satisfaction of the City Engineer.

E12. Encroachment Permit. Provide root barriers when the drip line of the mature trees covers the sidewalk.

Root barriers for sidewalk protection shall be 16' long or extend to drip line of the mature tree, whichever is greater, and be 1.5' deep, and centered on trees. Root barrier s for curb and gutter protection shall be 16' long or extend to drip line of the mature tree, whichever is greater, and be 2’ deep, and centered on trees.

E13. Encroachment Permit. Existing streetlights shall be clear of proposed sidewalk, developer shall relocate as necessary.

E14. Encroachment Permit. Mission College Boulevard along the project frontage has been paved (type II slurry seal). No pavement cuts are permitted per the City pavement moratorium (Ordinance No. 1998) until after December 31, 2025 . Refer to https://www.santaclaraca.gov/our -city/departments-g-z/public- works/maintenance-operations/street-maintenance/pavement-preservation-ordinance for more information.

E15. Encroachment Permit. Pavement treatment shall be 2” overlay with digouts for the full street width of Freedom Circle.

E16. Easement. Dedicate required on-site easements for any new public utilities, and/or emergency vehicle access by means of subdivision map or approved instrument at time of development.

E17. Easement. Dedicate sidewalk easements along the project frontage where public sidewalks extend into private property. Sidewalk easements are to be 1’ behind proposed back of walk where there is landscaping behind sidewalk. Sidewalk easement where hardscape is behind sidewalk is to be at back- of-walk. Cold joint is required between public sidewalk and private hardscape.

E18. Easement. Dedicate private storm water overland release easements for overland flow crossing proposed property lines.

E19. Easement. Record release of interest for “Agreement for installation and maintenance of landscape improvements” (C484 P109, SC14365), “Landscape improvement and maintenance easement” (C992 P12, SC14388), and “Agreement for installation and maintenance of landscape i mprovements” (C631 P680, SC14388-A).

E20. Easement. Dedicate private storm water overland release easements for overland flow crossing proposed property lines.

E21. Agreement. If requested, owner or designee shall prepare and submit for City approval a maintenance plan for all sidewalk, curb and gutter, landscaping and irrigation system improvements installed within the public right-of-way prior to encroachment permit issuance. Such plan shall include at a minimum, maintenance requirements for trees and shrubs, in acknowledgement of developer’s/property owner’s obligation under Chapter 12.30 and 17.15.

E22. Building Permit. File letter of map amendment/revision with FEMA for portions of proposed structure within flood zone AH.
________________________________________________________________________________ City Council Hearing March 25, 2025 Page 6 of 11

PUBLIC WORKS DEPARTMENT - STORMWATER

DESIGN / PERFORMANCE—PRIOR TO BUILDING PERMIT ISSUANCE
ST1. Final Stormwater Management Plan. Prior to City’s issuance of Building or Grading Permits, the applicant shall develop a Final Stormwater Management Plan, update the C.3 Data Form, the Special Project Narratives and Worksheet (as appropriate), and an Erosion and Sediment Control Plan.

ST2. 3rd Party Review of Final Stormwater Management Plan. The Final Stormwater Management Plan and all associated calculations shall be reviewed and certified by a qualified 3rd party consultant from the SCVURPPP List of Qualified Consultants, and a 3rd party review letter (on design) shall be submitted with the Plan.

ST3. Notice of Intent. For project that disturbs a land area of one acre or more, the applicant shall provide a copy of the Notice of Intent (NOI) with WDID number for coverage under the State Construction General Permit. Active projects with NOI will be inspected by the City once per month during the wet season (October – April).

ST4. Best Management Practices. The applicant shall incorporate Best Management Practices (BMPs) into construction plans and incorporate post-construction water runoff measures into project plans. Include the SCVURPPP Countywide Construction BMPs Plan Sheet with the plans. Applicant to add Source control measures with designations from C.3 stormwater handbook, Appendix H.

ST5. C.3 Treatment Facilities Construction Notes. Include the C.3 Treatment Facilities Construction Notes on the Improvement Plans and/or Stormwater Control Plans.

ST6. Decorative & Recreational Water Features. Decorative and recreational water features such as fountains, pools, and ponds shall be designed and constructed to drain to the sanitary sewer system only.

ST7. Small Projects. For single-family homes and other small projects that create and/or replace 2,500 – 10,000 square feet of impervious surface area, the applicant shall implement at least one of the following site design measures:
a. Direction of roof runoff into cisterns or rain barrels b. Direction of roof, sidewalk, walkway, patio, driveway, or parking lot runoff onto vegetated areas c. Construction of sidewalks, walkways, patios, bike lanes, driveways, and parking lots with permeable surfaces
Plans shall specify which site design measures are selected for the project and show the direction of flow from impervious surfaces to the selected site design measures. All measures shall meet the design criteria in the 2016 C.3. Stormwater Handbook, Appendix K: Standard Specifications for Lot-Scale Measures for Small Projects.

ST8. Interior Floor Drains. Interior floor drains shall be plumbed to the sanitary sewer system and not connected to the City’s storm drain system.

ST9. Trash Enclosure Floor Drains. Floor drains within trash enclosures shall be plumbed to the sanitary sewer system and not connected to the City’s storm drain system.

ST10. Architectural Copper. The use of architectural copper is prohibited.

DURING CONSTRUCTION OR OPERATION
ST11. Biotreatment Soil Media. Applicant shall install biotreatment soil media that meets the minimum specifications as set forth in the SCVURPPP C.3 Stormwater Handbook. If percolation rate test of the biotreatment soil mix is not performed on-site, a certification letter from the supplier verifying that the soil meets the specified mix (the date of such document shall not be older than 3 months).

ST12. Stormwater Control Measure Inspection. At critical construction phases, all stormwater control measures shall be inspected for conformance to approved plans by a qualified 3 rd party consultant from
the SCVURPPP List of Qualified Consultants.

ST13. Inspections. Permeable Pavement, Media Filter vaults, and Trash Full Capture Devices shall be inspected by a 3 rd party reviewer and/or manufacturer representative for conformance with the details and specifications of the approved plans. All new pervious concrete and porous asphalt pavements should have a minimum surface infiltration rate of 100 in./hr. as described in the SCVURPPP C.3 ________________________________________________________________________________ City Council Hearing March 25, 2025 Page 7 of 11

Handbook. A map displaying the number, location and details of full trash capture devices shall be prepared as an attachment to the Operations and Maintenance (O&M) Agreement with the City.

ST14. Stormwater Treatment Facilities. Stormwater treatment facilities must be designed, installed, and maintained to achieve the site design measures throughout their life in accordance to the SCVRUPPP C.3 Stormwater Handbook (Chapter 6 and Appendix C).

ST15. Amendments to Operation & Maintenance Agreement. Any site design measures used to reduce the size of stormwater treatment measures shall not be installed for the project without the written approval from the City, installing the corresponding resizing of other stormwater treatment measures and an amendment of the property’s O&M Agreement.

ST16. Stormwater Pollution Prevention Messaging. Developer shall install an appropriate stormwater pollution prevention message such as “No Dumping – Flows to Bay” on any storm drains located on private property.

ST17. Outdoor Storage Areas. All outdoor equipment and materials storage areas shall be covered and/or bermed, or otherwise designed to limit the potential for runoff to contact pollutants.

PRIOR TO FINAL OF BUILDING PERMIT
ST18. As-Built Drawings. As-Built drawing shall be submitted to the Public Works Department.

ST19. 3
rd Party Concurrence Letter. 3rd Party concurrence letter on the C.3 facilities construction shall be submitted to the Public Works Department. The letter shall be prepared by a 3rd party consultant from the SCVURPPP List of Qualified Consultants. The City reserves the right to review the 3 rd party inspection report on the C.3 stormwater facility installation.

ST20. Final C.3 Inspection. Applicant shall schedule and City shall conduct a final C.3 inspection.

ST21. Operation & Maintenance Agreement. The property owner shall enter into an Operation and Maintenance (O&M) Agreement with the City for all installed stormwater treatment measures and full trash capture devices in perpetuity. Applicants should contact Public Works Dept. - Environmental Services at (408) 615-3080 or [email protected] for assistance completing the Agreement. For more information and to download the most recent version of the O&M Agreement, visit the City’s stormwater resources website at http://santaclaraca.gov/stormwater. Inspection of permeable pavement, media filter vaults and full trash capture devices is to be done annually by December 31 of each year. o Scott Boulevard/Central Expressway
o Lafayette Street/Central Expressway
o De La Cruz Boulevard/Central Expressway
o Agnew Road/Montague Expressway
o Zanker Road/Montague Expressway
o Lick Mill Boulevard/Montague Expressway
o North 1st Street/Montague Expressway
o Lawrence Expressway/Monroe Street
o Lawrence Expressway/Pruneridge Avenue
o Kiely Boulevard/Benton Street
o Kiely Boulevard/Homestead Road

STREETS DIVISION
Right of Way Landscape

DESIGN / PERFORMANCE -- PRIOR TO ISSUANCE OF BUILDING PERMIT L1. Tree Preservations Specifications. Include City of Santa Clara Tree Preservation/ City Arborist specifications on all improvement plans.

L2. Mature Trees. Identify existing mature trees to be maintained. Prepare a tree protection plans for review and approval by the City prior to any demolition, grading or other earthwork in the vicinity of existing trees on the site.

L3. Tree Replacement. 2:1 tree replacement ratio required for all trees removed from the right-of-way.

________________________________________________________________________________ City Council Hearing March 25, 2025 Page 8 of 11

DURING CONSTRUCTION OR OPERATION
L4. No Public Root Cutting. No cutting of any part of public, including roots, shall be done without securing prior approval of the City Arborist. Tree trimming/removal shall be done in accordance to the City of Santa Clara Tree Preservation/City Arborist specifications and with direct supervision of a certified arborist (Certification of International Society of Arboriculture).

PRIOR TO FINAL OF BUILDING PERMIT
L5. In Lieu Fee. If 2:1 replacement ratio cannot be met for removal of right of way landscape trees, tree planting fee must be paid prior to building permit final.

Solid Waste

DESIGN / PERFORMANCE -- PRIOR TO ISSUANCE OF BUILDING PERMIT SW1. Post-Construction Solid Waste Generation Estimation and Collection Form. The applicant shall complete and provide the Post-Construction Solid Waste Generation Estimation and Collection Form, which includes the estimation of trash and recycling materials generated from the project. Use the City’s Solid Waste Guidelines for New and Redevelopment Projects as specified by the development type.

Contact the Public Works Department at [email protected] or (408) 615-3080 for more information.

SW2. Site Plan. The applicant shall provide a site plan showing all proposed locations of solid waste containers, chutes, compactors, trash enclosures and trash staging areas. The site plan shall show the route or access for trash and recycling collectors (trucks) including vertical clearance, turning radius and street/alley widths. All plans shall comply with the City’s Solid Waste Guidelines. Solid metal roof, gates and a trench drain shall be installed within the trash enclosure and connected to the on-site sewer system.

SW3. Construction Waste Diversion. For projects that involve construction, demolition or renovation of 5,000 square feet or more, the applicant shall comply with City Code Section 8.25.285 and recycle or divert at least sixty five percent (65%) of materials generated for discard by the project during demolition and construction activities. No building, demolition, or site development permit shall be issued unless and until applicant has submitted a construction and demolition debris materials check-off list. Applicant shall create a Waste Management Plan and submit, for approval, a Construction and Demolition Debris Recycling Report through the City’s online tracking tool at http://santaclara.wastetracking.com/.

SW4. Authorized Service Haulers. This project is subject to the City’s Accumulation, Transportation and Disposal of Solid Waste Ordinance (Chapter 8.25 of the Municipal Codes), which requires the handling and disposal of waste by authorized service haulers. Insert the General Notes for t he Construction & Demolition (C&D) Waste Management into construction plans in accordance with the City’s municipal codes prior to the issuance of a Building or Grading permit. Provide the Green Halo waste online tracking number to Building staff prior to the issuance of a demolition or building permit.

SW5. Exclusive Franchise Hauling Area. Project applicant shall contact the Public Works Department, Street Maintenance Division at (408) 615-3080 to verify if the property falls within the City’s exclusive franchise hauling area. If so, the applicant is required to use the City’s exclusive franchise hauler and rate structure for any hired debris boxes. Prior to the issuance of a Public Works clearance, the project applicant shall complete and sign the Construction and Demolition (C&D) / Waste Management Rules and Regulations Form.

DURING CONSTRUCTION OR OPERATION
SW6. Waste Generation Tracking. Applicant to track all waste generated and upload debris tags to GreenHalo for City staff review.

PRIOR TO FINAL OF BUILDING PERMIT
SW7. Weight Tickets. Prior to obtaining a Temporary or Final Certificate of Occupancy, individual weight tickets for all materials generated for discard or reuse by the project during demolition and construction activities shall be uploaded to Green Halo and submitted for review and approval by Environmental Services. At a minimum two (2) weeks review time is required. ________________________________________________________________________________ City Council Hearing March 25, 2025 Page 9 of 11

SILICON VALLEY POWER
DESIGN / PERFORMANCE – PRIOR TO ISSUANCE OF BUILDING PERMIT SVP1. Electrical services / Utility Connection Points shall be designed for each parcel.

SVP2. Remove any plants/trees from SVP easements.

WATER & SEWER DEPARTMENT

DESIGN / PERFORMANCE -- PRIOR TO ISSUANCE OF BUILDING PERMIT W1. Related Approvals. Applicant shall comply with all related City approvals, entitlements, permits, or requirements associated with the subject property, unless explicitly superseded or revised by the Director of Water and Sewer Utilities.

W2. Encroachment Permit . Prior to issuance of Building Permits, the applicant shall submit an encroachment permit application and design plans for construction of water utilities that comply with the latest edition of the Water & Sewer Utilities Water Service and Use Rules and Regulations, Water System Notes, and Water Standard Details and Specifications. In addition, prior to the City's issuance of Occupancy, the applicant shall construct all public water utilities per the approved plans. The Water & Sewer Utilities will inspect all public water utility installations and all other improvements encroaching public water utilities.

W3. Utility Design Plans. Utility Design Plans shall indicate the pipe material and the size of existing water, recycled water and sewer main(s). The plans shall show the nearest existing fire hydrant and the two nearest existing water main line gate valves near the project area. The plans shall show meter and backflow configurations to scale and per City of Santa Clara Water & Sewer Utilities Standard Details.

Note that all new water meters and backflow prevention devices shall be located behind the sidewalk i n a landscape area. Fire hydrants should be located two feet behind monolithic sidewalk if sidewalk is present; two feet behind face of curb if no sidewalk is present, per City Std Detail 18. The plans shall provide the profile section details for utilities crossing water, sewer, or recycled water mains to ensure a 12” minimum vertical clearance is maintained.

W4. Utility Separations. Applicant shall adhere to and provide a note indicating that all horizontal and vertical clearances comply with State and local regulations. The applicant shall maintain a minimum 12” of vertical clearance at water service crossing with other utilities, and all required minimum horizontal clearances from water services: 10' from sanitary sewer utilities, 10’ from recycled water utilities, 8' from storm drain utilities, 5' from fire and other water utilities, 3' from abandoned water serv ices, 5' from gas and electric utilities, and 5’ from the edge of the propose or existing driveway. For sanitary sewer, water, and recycled water utilities, the applicant shall maintain a minimum horizontal clearance of 10' from existing and proposed trees. If applicant installs tree root barriers, clearance from tree reduces to 5' (clearance must be from the edge of tree root barrier to edge of water facilities). No structures (fencing, foundation, biofiltration swales, etc.) allowed over sanitary sewer, potable water and/or recycled water utilities and easements.

W5. Separate Services. Applicant shall submit plans showing proposed water, recycled water, sanitary sewer, and fire services connected to a public main in the public right- of-way to the satisfaction of the Director of Water & Sewer Utilities. Different types of water and recycled water use (domestic, irrigation, fire) shall be served by separate water services, each separately tapped at the water main. Tapping on existing fire service line(s) is prohibited. Approved backflow prevention device(s) are required on all potable water services.

W6. City Standard Meters and Backflows. All proposed meters and backflows for all water services shall meet the current City of Santa Clara Water & Sewer Utilities Standard Details. Plans shall show meter and backflow configurations to scale.

W7. Existing Services. The applicant must indicate the disposition of all existing water and sewer services and mains on the plans. If the existing services will not be used, then the applicant shall properly abandon these services to the main per Water & Sewer Utilities standards and install a new service to accommodate the water needs of the project. The applicant shall bear the cost of any relocation or ________________________________________________________________________________ City Council Hearing March 25, 2025 Page 10 of 11

abandonment of existing Water Department facilities required for project construction to the satisfaction of the Director of Water and Sewer Utilities.

W8. On-Site Storm Drain Treatment . Prior to issuance of Building Permit, the applicant shall submit plans showing any onsite storm water treatment system. The plan shall include a section detail of the treatment system. No water, sewer, or recycled water facilities shall be located within 5-feet of any storm water treatment system.

W9. Water Usage. Prior to the issuance of Building Permits, the applicant shall provide documentation of water usage so the Water Division can verify the appropriate size of all proposed water meters. Please note that if the existing water services are incapable of supplying the water needs to the site, the existing services shall be abandoned, and new separate dedicated water services shall be provided for each use (domestic and irrigation).

W10. Landscaping. All the landscaping for the project shall comply with the California Water Conservation in Landscaping Act, Government Code Section 65591 et. seq. All plants shall be either California native or non-invasive, low water-using or moderate water-using plants. High water-using plants and nonfunctional turf are prohibited.

W11. Water Features. Prior to issuance of Building Permits, the applicant shall submit plan details for all water features (including but not limited to fountains and ponds) designed to include provisions for operating the system without City potable water supply and capable of being physically disconnected from source of potable water supply during City declared water conservation periods, to the satisfaction of the Director of the Water & Sewer Utilities. Decorative water features may be permanently connected to the City’s recycled water supply.

W12. Easements. Prior to City’s issuance of Building or Grading Permits, the applicant shall provide a dedicated water utility easement around the backflow prevention device onsite. The water utility easement for the water services and all other public water appurtenances shall be a minimum 15 feet wide and be adjacent to the public right-of-way without overlapping any public utility easement.

Additionally, the applicant shall submit plans defining existing easements so Water Division can verify if there are any conflicts with proposed easements and water utilities.

W13. Underground Fire Permit. Prior to issuance of Building Permits, applicant shall submit an underground fire permit unless otherwise waived by the Fire Department. If fire flow information is needed, applicant shall coordinate with Water and Sewer Utilities Department, for fire flow information at (408)615-2000. A dedicated fire service line, with an approved backflow prevention device, shall be used for on-site fire hydrants. Fire service lines required for commercial and industrial use shall be sized appropriately per fire flow demand and code requirements.

DURING CONSTRUCTION
W14. City Standard Meters and Backflow Installation. No meters or backflows shall be installed prior to establishment of water service account with the Municipal Services Division of the Finance Department.

The applicant shall provide a copy of the account information to the Water and Sewer Utilities Department Inspector and Meter Shop prior to installation of any meter or backflow. All meters and backflows approved for installation shall be tested prior to use. Water service connections shall not be used prior to authorization by the Water and Sewer Utilities inspector.

W15. Construction Water. This project shall use recycled water for all construction water needs for onsite and offsite construction.

W16. Water Shortage Response Actions. Pursuant to the City of Santa Clara’s Urban Water Management Plan, during times of drought or water shortage, the City implements water shortage response actions in accordance with the level of water shortage declared. All construction activities and all new irrigation connections are subject to the Water Shortage Response Actions in effect at the time of construction and connection of the irrigation service.

Water Shortage Response Actions for Stage 2 and higher include water use restrictions that limit the use of potable water such as:
a. prohibiting the installation of new potable water irrigation services. new irrigation connections, construction, and dust control.
________________________________________________________________________________ City Council Hearing March 25, 2025 Page 11 of 11

b. restrict the use of potable water used for construction and dust control if recycled water is available.

This project is subject to all the requirements and restrictions of the Water Shortage Response Actions in place or adopted during the duration of the project. For more information, visit the City of Santa Clara Water & Sewer Utilities website at www.santaclaraca.gov/waterconservation.

PRIOR TO FINAL OF BUILDING PERMIT
W17. Record Drawings. Upon completion of construction and prior to the City’s issuance of a Certificate of Occupancy, the applicant shall provide "as -built" drawings of the public water utility infrastructure prepared by a registered civil engineer to the satisfaction of the D irector of Water & Sewer Utilities Department.

W18. Conditional Releases. The applicant shall comply with all the requirements of any building permit conditional release requirements.

_____________________________________
KEY:

G = General
P = Planning Division
BD = Building Division
H = Housing & Community Services Division
F = Fire Department
PR = Parks & Recreation Department
PD = Police Department
E = Engineering Division
Streets Division (Landscape, Solid Waste, and Stormwater) L = Landscape
SW = Solid Waste
ST = Stormwater
SVP = Silicon Valley Power
W = Water & Sewer Department

ACKNOWLEDGEMENT AND ACCEPTANCE OF CONDITIONS OF APPROVAL

Permittee/Property Owner

The undersigned agrees to each condition of approval and acknowledges and hereby agrees to use the project property on the terms and conditions set forth in this permit.

Signature: _________________________________________________

Printed Name: _________________________________________________

Relationship to Property: _________________________________________________

Date: _________________________________________________

Pursuant to Santa Clara City Code 18.128.100, the applicant shall return this document to the Department, properly signed and dated, within 30-days following the date of the Acknowledgement.

Attachment 9: Project Data Table
Project Address: 2518 Mission College Blvd.

Project Number: PLN24-00160 and PLN24-00213

Proposed Zoning: Planned Development (PD)

Standard Existing Proposed
Lot Area (SF) (min): 25.74 acres 25.74 acres divided into 6 lots. • Lot1: 3.71 acres
• Lot 2: 4.38 acres
• Lot 3: 5.88 acres
• Lot4: 5.11 acres
• Lot 5: 3.94 acres
• Lot 6: 2.73 acres
Building Area/units 12 two-story office
buildings

Building 1: 516, 840 sq. ft/ 362 units
Building 2: 504, 130 sq. ft/ 341 units
Building 3: 763,530 sq. ft/ 536 units
Building 4: 527,730 sq. ft/ 292 units
Building 5: 471,690 sq. ft/ 261 units
Total: 427,380 sq. ft. 1,766,170 GSF Building Area
1,017,750 GSF Garage
Building Coverage (All): - 50.64%
Retail Area - 3,500
Parking: - Building 1: 500
Building 2: 474
Building 3: 728
Building 4: 398
Building 5: 359
Total: 2,459
Guest: - 20
Class 1 Bicycle: - 1,792
Class 2 Bicycle: - 120
Trees 417 287 trees removed
Private recreation space: - 3.08 acres
Public recreation space: - 3.35 acres Public Park

Thefollowinggoalsandpolicieswill guidethedevelopment of theFreedomCircleFocusArea:

FC-G1:Developanurban-scalemixed-useactivitycenter inNorthSantaClaratosupport economicvitalitywhileincreasingresidential options.

SCParkRedevelopment inFCFAPprovideshousingnear jobscentersandisamulti-modalcommunityprovidinginternal andexternal connectivitysupportingeconomicvitality, andofferingarangeof housingproducts, sizesandpricingtooffer optionstonewresidents.

FC-G2: Providefor arangeof housingtypesanddensitiestoaccommodatefutureresidentsandtocreatediversityinbuildingscaleandtypology.

Thereare1,792unitsofferedranginginsizefrom385SFtoover 1,300SF. Therearetwoproduct types, all withstudio, andoneandtwobedroomunits. Theproject consistsof 5, fivestoryresidential buildingsorganizedaroundparks, openspacesand1,200smaller sizedunits,withmanyaffordablebydesign.

FC-G3: Createacompleteneighborhoodthat provideseasyaccesstoday-to-dayservicesandamenitiesfor residents, employeesandvisitors Theproject islocatedwithina10minutewalkor bikeridealongtheSanTomasAquino CreekTrail toprovideservicesandamenitiesfor residentsandvisitorsalike. It isalsolocatedwithinthecoreareawherethousandsof jobsareofferedandentertainment venues.

FC-G4: Reducerelianceonprivatevehiclesandimprovejobs/housingbalancebylocatingamenitiesandjobsthat canbecomfortablyandsafelyaccessedfromhousingbywalking.

Theproject isdesignedtoprovideconnectivitythroughout withamulti-modal andtransitsupportiveapproachtothedesign. Thereispedestrianandbicyclepublicaccessnorth-southandeast-west connectingtheproject tothegreater community.

FC-G5: Createahumanscaledpublicrealmthroughinvitingarchitectureandurbandesign.

Themaster plannedcommunityhasahumanscaledrealmestablishedbyaseriesof definedopenspacesmarkedbystrongarchitectural formsandmatureredwoodtrees. EachbuildingisclassicallycomposedandproportionedinMediterraneanarchitectural styles. Aninterconnectednetworkthroughvariouscourtyardsprovidesoutdoor recreationincludingpools, outdoor diningandrecreation.

FC-G6: Improvemulti-modal transportationoptionsandconnections.

Theentireproject isfocusedonmulti-modal design, throughtrialsandaccessiblepublicconnectivity, amplebicycleandelectricvehiclechargingandparkinginsecuredgarages.

FC-G7: EnhanceconnectivitytotheSanTomasAquinoCreektrail. III.

Theproject isdesignedtoprovidesafeaccessfromMissionCollegethroughtheproject withvariedamenitiestoenjoyalongtheway, toreachthesouthernpublicparkandthenacrosswalkthat takesbothpedestriansandbicycliststocrossover toconnect directlytotheSanTomasAquinoCreekTrail. Theproject will alsobringonemileof newbicyclelaneswhichwill provideeasyaccesstothetrail alongFreedomCircleDrive.

Policies:

FC-P1: Allowfor arangeof housingdensityanddevelopment intensitythroughout theplanarea, consistent withtheGeneral Plandesignationsandoverall buildout capacity.

Theproject isconsistent withtheGeneral Plandensityrangeof 51-100du/ac. Therearearangeof apartment sizesandincomelevels.

FC-P2: Co-locatecommercial, recreational andother activeusestocreatenodesof activitythroughout theplanarea Acentral nodewill act asapublicgatheringspacewithgroundfloor usesandactivation. At thecenter of thisactivationwill bea3,500SFpublic-servingcafe/market .Otherpointsof activationincludeco-workingspacefor theresidentsandalargefitnesscenter .FC-P3:Requireactivestreet frontagesandgroundfloor usestocreateapedestrian-friendly,cohesiveurbanenvironment Theplanisdesignedwithastrongpedestrianorientation. Aninterconnectednetworkof groundfloor activeusesoffersanactivestreet frontagetotheMainSt. designedtoaccommodateresidentsaswell asvisitorstothecentral cafe.

FC-P4: Providepublicparklandandprivately-ownedpublicopenspace(POPOs) that isaccessibletoall residentsandvisitors, adequatetomeet resident activityneeds, andconsistentwiththeGeneral Planrequirementsandother Cityregulations.

Theproject aimstoaddresstheessential needfor accessiblepublicparklandandprivatelyownedpublicopenspace(POPOs) for all residentsandvisitors. Theproject will provide9.5acresof suchspaces, strategicallydistributedtocater tovariousrecreational andcommunitygatheringneeds. Notably, a2.7acreneighborhoodparkislocatedonthesouthernportionof thesite, servingasafocal point for communityengagement andoutdoor activities.

FC-P5: Requiretheprovisionof openspace, or payment of in ‐ lieufeesfor parksandopenspacefor residential development, consistent withtheCity’sParklandDedicationOrdinance.

Theproject will followall provisionsof thecityparklanddedicationordinanceandQuimbyActguidelines, consistent withtheGeneral Plan.

FC-P6: Prioritizesize, shape, andlocationof publicparklandtoensurethat amenitiesareusable, programmable, andflexible.

Applicant will workwithcitystaff toensureamenitiesareusable, programmable, andflexibleandmeet therequirementsof theCity’sParkordinance.

FC-P7: Encouragesensitivedesignandsiteplanningtomitigatethescaleandheight of largerbuildingsthroughuseof buildingmassing, setbacks, façadearticulation, fenestration, variedparapetsandroof lines, andpedestrian ‐ scaledarchitectural details.

Theplannedapartment communityisenvisionedasadynamicareathat meetstheobjectiveoftheFCFAP. Theproject consistsof fivewrapbuildingsof TypeIII constructionwhichhidetheparkingstructurefromview. Buildingsarearticulatedwithgenerousopenlandscapedcourtyardsandsetbacks.

FC-P8: Provideappropriatetransitionsbetweennewdevelopment intheFocusAreaandadjacent usesconsistent withGeneral PlanTransitionPolicies.

Theproject hasbeenthoughtfullydesignedtointegratewithintheFCFAexistingandplannedlandusesprovidingtransitionof usesandtakingintoconsiderationadjacencyincludingsharedinfrastructure, andalignment of connectivitywithintheplanningarea.

FC-P9: Requirethat buildingfacadesandentrancesdirectlyfacestreet frontages, withahighproportionof transparent windowsfacingthestreet for nonresidential uses.

Theproject designwill reflect ahighdegreeof facadesandentrancesdirectlyfacingstreetfrontageswithahighdegreeof transparent windowsfacingthestreet for all non-residential usesparticularlythoseinthecentral node.

FC-P10: Minimizesurfaceparkingbyrequiringbelow ‐ gradeor structuredparkingfacilitieswithactiveusesalongstreet frontages.

All residential parkingislocatedwithinstructuredparkinggarages. Thepublicparkedgewillincludestreet parkingconsistent withcompletestreetsprogrammingfor publicparkingusage.

FC-P11: Establishparkingratiosthat support transit, activetransportationandsharedvehicleuse Theproject isdesignedtotheminimumcityparkingrequirements. Theproject doesnot includeguest parking, includesonebicycleparkingspot per unit, andconnectstopublicbikewaysystems.

FC-P12: Encouragesharedparkingbetweenusesandparcels, includingtheshareduseofexistingstructures.

Not applicabletothisproject. Tenant parkingisrestrictedtoindividual residential buildings.

FC-P13: Establishaffordablehousingrequirementsfor residential andresidential mixed-usedevelopmentsthat support regional growthgoals, Citypolicy, andlocal need.

Theproject will include5%verylowincomedeedrestrictedunits, and10%moderateincomerestrictedunitsfor atotal 15%affordablehousingdesignation.

FC-P14: Providenewstreet, bicycleandpedestriannetworksthat breakdownlargeblocksandsites, accommodatemultiplemodesof travel, andmaximizeconnectionstoactivityhubsandtransit facilities.

Largeblocksarebrokendownwithpedestrianandresident accessthroughthecenter of theproject. Bikepathsontheexterior andinterior of theproject encourageconnectivitytotheSanTomasAquinotrail systemandbroader SantaClarabikepathsystem.

FC-P15: Developdesignstandardsandguidelinestosupport activeground-floor environments,welcomingpublicspaces, andsafeandcomfortablesidewalksandpathways.

Theproject designstandardsandguidelineswill support activegroundfloor environmentswhereapplicable.

FC-P16: Designandprogramtheplanareaandsitestoencouragewalking, bicyclingandtransituse.

Multi-modal connectivityisfundamental totheplanningof thisproject. Withover 1mileof newbicyclelanesaddedandpublicpedestrianandbicycleconnectivitybisectingtheproject site, thispolicyhasbeenmet.

FC-P17: Minimizeenvironmental impactsthroughsustainablebuildingandinfrastructuredesign,consistent withCALGreenandSantaClaraClimateActionPlanrequirements.

Buildingswill bedesignedinaccordancewithTitle24regulations, Cal GreenandSantaClaraClimateActionPlanrequirements.

FC-P18: RedesignMissionCollegeBoulevard, FreedomCircle, andHichbornDrivetobetterbalancespacededicatedtovehicles, bicycles, andpedestrians.

Theproject teamwill coordinatewithcitystaff basedonrecommendationsfromtrafficoperational analysistoredesignrespectivestreetsasneeded.

FC-P19: RedesignMissionCollegeBoulevard, FreedomCircle, andHichbornDrivetofacilitatesafeandcomfortablepedestriancrossings.

Theproject teamwill coordinatewithcitystaff basedonrecommendationsfromtrafficoperational analysistoredesignrespectivestreetsasneeded.

FC-P20: MaintainVTAbustransit serviceintheFocusAreaPlanareaandimprovetransit stopsandshelters Theproject teamwill coordinatewithstaff tomaintainbustransit serviceandimprovetransitstopswhereneeded.

FC-P21: DesignpedestrianandbicyclenetworksandinfrastructuretofacilitateaccesstotransitstopsonGreat AmericaParkway, MissionCollegeandTasmanDrive Pedestrianandbicyclenetworksandinfrastructurewill facilitateaccesstotransit stopsonGreatAmericaParkway, MissionCollegeandTasmanDrive, includingconnectivitytoSanTomasAquinotrail andwideningof Hichborndrive.

FC-P22: Locateloadingzonesandridesharepick-up/ drop-off areasawayfrombusstops.

Loadingzonesandridesharepick-up/ dropoff areaswill belocatedawayfrombusstops FCP23: RequiredevelopmentstocontributetoCityvehiclemilestraveled(VMT) goalsandimplement avarietyof sustainabletransit solutionsasaTransportationDemandManagement(TDM) program.

Theproject areaislocatedinaTransit SupportiveAreaof thecityandwill contributetothesegoalsasrequired.

FC-P24: RequiredevelopersandpropertyownerstocoordinatewithNorthSantaClaraemployersandstakeholderstoexploreparticipatinginaprivatetransit systemsand/or aTransportationManagement Agency(TMA) aspart of theSpecificPlanprocess Acknowledged. Applicant tocoordinateaspart of theentitlement process.

SANTA CLARA PARK

PD REZONING APPLICATION

03.12.2025

2518 MISSION
COLLEGE BOULEVARDSANTA CLARA PARK | NOVEMBER 2
Illustrative Visualization of the proposed development
SANTA CLARA PARK | Irvine Company Apartment Development | City of Santa Clara PD Rezoning Application SANTA CLARA PARK | Irvine Company Apartment Development | City of Santa Clara PD Rezoning Application | PROJECT TEAM |
CLIENT
Irvine Company Apartment Development

ARCHITECT
MVE + Partners

CIVIL ENGINEERING
BKF Engineering

LANDSCAPE ARCHITECT

EPTDESIGN

TRAFFIC

FEHR & PEERS

ENVIRONMENTAL
ROUX Associates
CEQA
MIG, Inc.

SANTA CLARA PARK | Irvine Company Apartment Development | City of Santa Clara PD Rezoning Application

TABLE OF CONTENTS
CHAPTER 1 | INTRODUCTION 1

1.1 Project Description 2

1.2 Project Location 3
CHAPTER 2 | LAND USE 4

2.1 Community Context 5

2.2 Regional Context Map 6-7

2.3 Existing Land Use 8

2.4 Connecivity 9-11

2.5 Mobility 12

2.6 Transportation Demand Management 13-14

2.7 Affordable Housing 15

2.8 Park Concept Inspiration 16-17

2.9 Publicly Dedicated Parkland 18-20

2.10 Private Open Space 21-25

2.11 Sustainability 26-27

CHAPTER 3 | STREETS 28

3.1 Design Principles 29-32
CHAPTER 4 | DESIGN GUIDELINES & STANDARDS 33

4.1 Massing and Architecture 34-43

4.2 Development Standards 44

4.3 Parking 45

4.4 Loading and Service Access 46-47

CHAPTER 5 | INFRASTRUCTURE & UTILITIES 48

5.1 Infrastructure & Utilities 49
CHAPTER 6 | PUBLIC SERVICES 50

6.1 Public Services 51

6.2 Impact to Public Services 52
CHAPTER 7 | FISCAL ANALYSIS 53

7.1 Fiscal Analysis (See Attachment ‘A’) 54
CHAPTER 8 | COMMUNITY OUTREACH 55

8.1 Public Participation 56-59
A |ATTACHMENT 60

1 SANTA CLARA PARK | Irvine Company Apartment Development | City of Santa Clara PD Rezoning Application 01 | Introduction
2 SANTA CLARA PARK | Irvine Company Apartment Development | City of Santa Clara PD Rezoning Application 1 | Introduction

1.1 PROJECT DESCRIPTION
The proposed project provides an opportunity,
consistent with the Freedom Circle Focus
Area Plan, to redevelop the existing Office
complex and create a high-density apartment
community, creating a sense of place through
connecting housing opportunities to project-
based amenities, on-site recreation, and public
and private park spaces in a multi-modal
environment. The project consists of 1,792
(inclusive of 298 Density Bonus Units) apartment
units with approximately 1,766,170 gross square
feet (GSF) of residential buildings and 1,017,750
GSF of garage square feet. The overall site density
is 69.7 dwelling units per acre. Of the 1,792 units
proposed, 1,239 of these units will average 667
SF per unit. These units make up 70% of the total
units in the project. The remaining 553 units will
average 839 SF per unit. All product types will
contain a range of studios, studios plus dens,
one and two bedrooms, and have been designed
with the surrounding workforce in mind. The
project will feature 15% affordable units with 5%
very low AMI and 10% moderate at 100% AMI.

The proposed project includes approximately
3,500 GSF of resident and public-serving retail
space and 13,100 GSF of amenity space.

Additional retail uses serving this site are located
nearby at Santa Clara Square, accessed through
the walkable San Tomas Aquino Creek Trail,
and other nearby retail properties in the Patrick
Henry and Mission College area. These facilities
are within a 2-mile radius of this site. This project
implements the vision of the Freedom Circle
Focus Area and will be approved through a
Planned Development Rezoning specifically for
this property.

The proposal will develop new residential
neighborhoods in conjunction with appropriate
affordable housing, amenities, parks, and open
space in a transit supportive region. Other
infrastructure improvements (i.e., sewer, water,
and storm drainage) would also be constructed
or expanded to serve the proposed project.

Figure 1.2: Illustrative Visualization of the proposed development 3 SANTA CLARA PARK | Irvine Company Apartment Development | City of Santa Clara PD Rezoning Application 1 | Introduction

1.2 PROJECT LOCATION
4 SANTA CLARA PARK | Irvine Company Apartment Development | City of Santa Clara PD Rezoning Application 02 | Land Use
5 SANTA CLARA PARK | Irvine Company Apartment Development | City of Santa Clara PD Rezoning Application 2 | Land Use

2.1 Community Context
The subject site is a 25.74-acre parcel of land
currently developed for Office and R&D uses
within the central portion of the Freedom Circle
Focus Area in the City of Santa Clara. The
Focus Area Plan designated the site to allow
high-density residential development. The site
is located directly south of Mission College
Boulevard and encircled by Freedom Circle
Drive on the property’s west, east, and south
boundaries. Primary access to the site would be
from Great America Parkway to Mission College
Boulevard, conveniently located off the Bowers/
Great America exit via the 101 freeway.

Irvine Company is proposing to redevelop the
site and provide an apartment community
in compliance with the recently approved
residential plan for the future of this portion of
the Freedom Circle Focus Area. The proposed
project includes street improvements and
upgrades for pedestrians and bicycles that
will improve connectivity and intersection
operations. The apartment community is also
within walking distance of the San Tomas Aquino
Creek Trail, which provides a direct pedestrian
link to Santa Clara Square, Levi Stadium, the
Santa Clara Convention Center, Light Rail, and
the extensive Bay Trail network. The project will
also include both public and private open space
and recreation and will include project-serving
retail for residents and the general public utilizing
the project’s park.

In addition, the Santa Clara Park Apartment
Community is within a short walk, bike ride, or
drive to Irvine Company’s Master planned Santa
Clara Square. This nearby community provides

1.7 million square feet of high-tech employment
space, a 125,000-square-foot neighborhood
retail center anchored by Whole Foods Grocery,
Fleming’s Steakhouse, Il Fornaio, Eureka, and
Puesto, and another 40,000 square feet of
ground floor retail along an activated mixed-use
frontage to a similar sized residential community.

This community is built within the backdrop of
11 acres of public parks and private recreation
areas.

The Freedom Circle Focus Area covers
approximately 108 acres and currently contains
predominantly commercial uses such as biotech
and electronics, business offices, a hotel
(Marriott), and various support services (such
as car rental, UPS store, medical/dental, and
restaurants). Great America Parkway generally
bounds the Plan Area to the west, California’s
Great America amusement park to the north,
San Tomas Aquino Creek to the east, and U.S. 101
to the south. The Plan Area is relatively flat and
developed, with buildings ranging in height from
two and three stories to up to 13 stories (Marriott
Hotel) in the west; buildings in the rest of the Plan
Area range from one to three stories. Directly to
the east of the proposed Irvine Company project
is the entitled Greystar project, proposed to be
a 1,075-unit multi-family residential project (with
some project-serving retail and a two-acre public
park) proposed for two currently vacant parcels
formerly owned by Intel Corporation in the
southeastern portion of the Future Focus Plan
Area. The Plan Area is generally underutilized,
and some buildings are vacant. (Plan area-wide
description, excerpt from Freedom Circle Focus
Area DEIR section 2.1.1)
Currently, no residential land uses, public parks,
or historic structures exist in the Plan Area. The
proposal will facilitate changing the current
underutilized office use, consistent with the
Focus Area Plan, into a walkable, connected
urban high-density community with various
amenities for its residents and the general public
visiting the project’s parks and using pedestrian
and bicycle features.

Consistent with the Freedom Circle Focus plan,
a comprehensive rezoning plan will be filed with
this project. The City certified a Programmatic
EIR for the Freedom Circle Future Focus Area,
such that subsequent implementing projects,
including but not limited to a General Plan
Amendment, PD Rezone, Architectural Review,
on- and off-site utilities, and/or all project
amenities and features necessary to implement
the plan may tier off of the certified document
by utilizing a CEQA Checklist or an Addendum
(perhaps with focused project-specific studies).
6 SANTA CLARA PARK | Irvine Company Apartment Development | City of Santa Clara PD Rezoning Application 2 | Land Use

2.2 Regional Context Map
Figure 2.2-1: Regional Location and Aerial
Figure 2.1-2: Site Plan
7 SANTA CLARA PARK | Irvine Company Apartment Development | City of Santa Clara PD Rezoning Application 2 | Land Use

FREEDOM CIRCLE

MISSION COLLEGE BLVD

FREEDOM CIRCLE
8 SANTA CLARA PARK | Irvine Company Apartment Development | City of Santa Clara PD Rezoning Application 2 | Land Use

2.3 Existing Land Use
The Santa Clara Park (SCP) project existing land
use is office/R&D consisting of 427,379 SF and
will be redeveloped to a residential community.

The SCP site is located within the approximately
108-acre Freedom Circle Future Focus Area
Plan Area, as designated by the General Plan, in
the northwestern part of the city and generally
bounded by Great America Parkway to the west,
California’s Great America amusement park to
the north, San Tomas Aquino Creek to the east,
and U.S. 101 to the south. Except for the currently
vacant Greystar project site located in the
southeast portion of the Future Focus Area Plan
Area, the Plan Area is essentially built out and is
in an area of the city primarily designated in the
General Plan as High Intensity Office/R&D with
some Regional Commercial, with uses such as
biotech and electronics, business offices, hotels,
and various support services (such as car rental,
UPS store, medical/dental, and restaurants).

According to the General Plan Land Use
Diagram, the site is designated as Very High
Density Residential (51-100 dwelling units per
acre). The Freedom Circle Future Focus Area
was added as a Phase III Future Focus Area
to the General Plan in 2022. Per the General
Plan and Freedom Circle Focus Area Plan, any
change in land use designation or rezoning of
land within the Freedom Circle area is subject to
the requirements of the Future Focus Area Goals
and Policies of the General Plan. The SCP project
will accomplish this via its proposed General
Plan Amendment and rezoning.

Buildings cover about 23 percent of the Future
Focus Area Plan Area. The Plan Area has a
“superblock street layout” with ample surface
parking that supports dependence on cars. The
buildings are spaced relatively far apart, with
surface parking lots in between. Pedestrian
linkages are limited.
/0□/2□/3□/4□/5□/6□/7□/8□□
/10□/5□/6□/6□/2□/10□/11□/4□/12□/4□/11□/13
/14 /15 /16 /16 /17 /18 /19/20/21 /22 □/20/21 □
/24 /17 /25/25/15 /21 /20 /19 /26 □
/25 /17 /27 /20/28/20/19/26
/29 /30 /31/32/33 /34 /35 □ /33 /37/38/38/39/30 /35 /40/41□ /41/40/42 /40/43 /39/38/44 /40/32/35 /8/45/46/45/47/48
/49 /29 /50 □/51 /37 /33 □/52 /39 /37 /35 /40
/53 /31 /43/35 /30 /31 /34/32 □/54 /55 /37 /35 /35 /43/40 □/52 /39 /37 /35 /40 /50 /56 /40 □/54 /55 /37 /35 /35 /43/40 □/52 /39 /37 /35 /40 /49 /29 /50 □/57 /34/58 /55 /35 □/52 /31 /34/43□/57 /34/32 /40 /53 /31 /43/35 /30/31 /34/32 □/57 /34/32 /40
/50 /53 /59 /60/53 /31 /38 /34/35 /39 /43□/53 /39 /30 /30 /34/41 /39 /30 □/57 /34/32 /40 /7/10/2□
/61 /62 /63 /62 /64/65 /47
/8/63/66 /67 /45/47/68/45□
/10 /63 /69/62 /67/63 /64/47 □
/61 /62 /63 /62 /64/65 /47
/0□/2□/3□/4□/5□/6□/7□/8□□
/10□/5□/6□/6□/2□/10□/11□/4□/12□/4□/11□/13
/14 /15 /16 /16 /17 /18 /19/20/21 /22 □/20/21 □
/24 /17 /25/25/15 /21 /20 /19 /26 □
/25 /17 /27 /20/28/20/19/26
/29 /30 /31/32/33 /34 /35 □ /33 /37/38/38/39/30 /35 /40/41□ /41/40/42 /40/43 /39/38/44 /40/32/35 /8/45/46/45/47/48
/49 /29 /50 □/51 /37 /33 □/52 /39 /37 /35 /40
/53 /31 /43/35 /30 /31 /34/32 □/54 /55 /37 /35 /35 /43/40 □/52 /39 /37 /35 /40 /50 /56 /40 □/54 /55 /37 /35 /35 /43/40 □/52 /39 /37 /35 /40 /49 /29 /50 □/57 /34/58 /55 /35 □/52 /31 /34/43□/57 /34/32 /40 /53 /31 /43/35 /30/31 /34/32 □/57 /34/32 /40
/50 /53 /59 /60/53 /31 /38 /34/35 /39 /43□/53 /39 /30 /30 /34/41 /39 /30 □/57 /34/32 /40 /7/10
/61 /62 /63
/8/63/66 /67 /45/47/68/45□
/10 /63 /69/62 /67/63 /64/47 □
/61 /62 /63 /62 /64/65 /47
Figure 2.4-1: Regional Connectivity
9 SANTA CLARA PARK | Irvine Company Apartment Development | City of Santa Clara PD Rezoning Application 2 | Land Use

2.4 Connectivity
Project Site
/0
/1
/2
/3
/4
/5□
/7/8/9/9/10/11/12 □
/14 /15/8 /16 /17/9 □
/7 /11 /16/18 /19□
/20 /8/9/21□ /22 /17 /21/23
/24/25 □/27 /28 /29 /30 /31 □/32 /33 /32 /32 /34□/35 /31 /36 □/37 /38/35 /39 □/40 /41□ /42/28/25/35 /28□ /37 /43 /28/29 /28□ /28/44/44/29 /40/45/36/46□ /35 /31/36/38/29 □ /44 /43/28 /25 □/35 /40 □/47 /48 /44 /44 /43/36 /49 /36 /25 /35 □/35 /31 /36 □ /50 /36 /25 /36 /29 /28 /43□/51 /43/28 /25 □/28 /25 /46 □/46 /36 /52 /25 /36 □/28 □ /41/48 /35 /48 /29 /36 □/40 /41□/31 /40 /48 /47 /38/25 /53 □/25 /36 /28 /29 □/54/40 /55 □ /30/36/25/35 /36/29 /47 /34 □ /29 /36/35 /28/38/43 □ /28/25/46□ /25/28/35 /48/29 /28/43 □ /40 /44 /36 /25 □ /47/44 /28 /30/36 /47/56
/0
/1
/2
/1
/3
/4
/5
□□□□□□□□□□□□□□□□/58 □/59 /60 /61/62 /63/64 /60 /65 /66 □/67 /68 /62 /69 □/68 /61/70 /71 /72 □/62 /69 /66 □ /71 /70 /73 /62 /69 /66 /73 /71 □/74 /70 /60 /71 /75 /68 /73 /76 □/70 /77□/62 /69 /66 □/78 /70 /79 /60 /65 □/58 /73 /66 /68 □ /80 /63 /61 /61 □ /70/77 /77 /66/73 □ /68/71/70/62 /69/66/73 □ /79/73 /70/65 /65 /64 /65 /63 /62 /66□ /79/70/71/71/66/79/62 /70/73 □ /77 /70/73 □ /74/63 /81/66/65 □ /68/71/75□ /67/66/75/66/65 /62 /73 /63 /68/71/65 /82 □ /83 /68 /62 /66 /80 /68 /76 /65 □/68 /61/70 /71 /72 □/84 /63/65 /65 /63/70 /71 □/85 /70 /61/61/66 /72 /66 □/86 /61/87 /75 /82□ /68 /62 □/62 /69 /66 □/78 /70 /79 /60 /65 □/58 /73 /66 /68 □/74 /70 /60 /71 /75 /68 /73 /63/66 /65 □/80 /63/61/61□/74 /66 □ /66 /65 /62 /68 /74 /61/63/65 /69 /66 /75 □/62 /70 □/73 /66 /63/71 /77/70 /73 /79 /66 □/63/59 /68 /72 /66 /68 /74 /63/61/63/62 /76 /88□ /68/71/75□ /69/63 /72/69/61 /63 /72/69/62 □ /77 /66/68/62 /60/73 /66/65 □ /68/71/75□ /68/59 /66/71/63 /62 /63 /66/65 /82 □ /58 □/79 /66 /71 /62 /73 /68 /61□/71 /70 /75 /66 □/80 /63/61/61□/68 /79 /62 □/68 /65 □/68 □ /67 /60 /74 /61/63/79 /89/90 /60 /68 /65 /63/64 /67 /60 /74 /61/63/79 □/72 /68 /62 /69 /66 /73 /63/71 /72 □/65 /67 /68 /79 /66 □ /68/71/75□ /67/73 /63 /70/73 /63 /62 /63 /91 /66□ /72/73 /70/60/71/75/64 /92/70/70/73 □ /68/79/62 /63 /87/66□ /60 /65/66 /65/82 □
□□□□□□□□□□□□□□□□/93 /65 /62 /68 /74 /61/63/65 /69 /63/71 /72 □/67 /66 /75 /66 /65 /62 /73 /63/68 /71 □/68 /71 /75 □ /74 /63/81 /66 □/71 /66 /62 /80 /70 /73 /81 □/62 /70 □/63/71 /79 /73 /66 /68 /65 /66 □/63/71 /62 /66 /73 /71 /68 /61□ /80 /68 /61/81 /68 /74 /63/61/63/62 /76 □/68 /71 /75 □/79 /73 /70 /65 /65 /64 /65 /63/62 /66 □/79 /70 /71 /71 /66 /79 /62 /63/87 /63/62 /76 □ /80 /69 /63/61/66 □/70 /67 /66 /71 /63/71 /72 □/60 /67 □/70 /67 /67 /70 /73 /62 /60 /71 /63/62 /63/66 /65 □/77/70 /73 □ /72/73 /70/60/71/75/64 /92/70/70/73 □ /68/79/62 /63 /87 /68/62 /63 /70/71/82 □ /58 □/62 /80 /70 /64 /68 /79 /73 /66 □/79 /70 /59 /59 /60 /71 /63/62 /76 □/67 /68 /73 /81 □/80 /63/61/61□ /67 /73 /70 /87 /63/75 /66 □/68 /71 □/70 /67 /66 /71 □/65 /67 /68 /79 /66 □/68 /71 /75 □/70 /77/77/66 /73 □ /77 /68/79 /63 /61 /63 /62 /63 /66/65 □ /62 /70□ /66/71/69/68/71/79 /66□ /79 /70/71/71/66/79 /62 /63 /87 /63 /62 /76 □ /62 /70□ /62 /69 /66 □/94 /68 /71 □/95 /70 /59 /68 /65 □/58 /90 /60 /63/71 /70 □/85 /73 /66 /66 /81 □/95 /73 /68 /63/61/82□ /96 /67 /66 /71 □/68 /71 /75 □/68 /79 /62 /63/87 /66 □/72 /73 /70 /60 /71 /75 /64 /92 /70 /70 /73 □ /77/73 /70 /71 /62 /68 /72 /66 /65 /88□/80 /66 /61/61/64 /75 /66 /65 /63/72 /71 /66 /75 □/61/68 /71 /75 /65 /79 /68 /67 /63/71 /72 □ /68/71/75□ /70/71/64 /65 /63 /62 /66□ /68/59 /66/71/63 /62 /63 /66/65 □ /80 /63 /61 /61 □ /66/71/65 /60/73 /66□ /87 /63/74 /73 /68 /71 /79 /76 /82□
□□□□□□□□□□□□□□□□/58 □/97 /78 /73 /66 /66 /75 /70 /59 □/98 /70 /70 /67 /99 □/84 /60 /61/62 /63/64 /100 /65 /66 □ /67 /68 /62 /69 □/80 /63/61/61□/79 /73 /66 /68 /62 /66 □/68 □/65 /68 /77/66 □/68 /71 /75 □/77/60 /71 /79 /62 /63/70 /71 /68 /61□ /74/63 /81/66□ /68/71/75□ /67/66/75/66/65 /62 /73 /63 /68/71□ /73 /70/60/62 /66□ /62 /70□ /66/71/69/68/71/79/66□ /79 /70/71/71/66/79 /62 /63 /87 /63 /62 /76 □ /68/71/75□ /61 /63 /71/81□ /62 /70□ /70/71/64 □ /68/71/75□ /70 /77/77/64 /65 /63/62 /66 □/62 /73 /68 /63/61□/67 /68 /62 /69 □/71 /66 /62 /80 /70 /73 /81 /65 /82□ Figure 2.4-2: Freedom Circle Focus Area Plan
10 SANTA CLARA PARK | Irvine Company Apartment Development | City of Santa Clara PD Rezoning Application 2 | Land Use
/0/1/2/3/4 /5/6□ /8/5/3/9□
/3/10 /5/8/11 /4 /11 /5/12□ □
/13 /14 /15 /16 /14 □/18 /19/14 /20 /14 □/21 /14 /20 /22 □/23/24 □/14 □/24 /25 /26 /20 /16 □/27 /23/24 /16 /14 /15 /28 /29 □/30/20 /26 /31 □ /14 □/32 /14 /20 /23/29 /16 /33 □/26 /30□/14 /31 /29 /15 /23/16 /23/29 /24 □/14 /15 /27 □/24 /29 /20 /32 /23/28 /29 /24 /34□/31 /14 /15 /33 □ /26 /30□/35 /25 /23/28 /25 □/28 /14 /15 □/36 /29 □/20 /29 /14 /28 /25 /29 /27 □/32 /23/14 □/14 □/37 /38/39 /31 /23/15 /40 /16 /29 □ /35 /14 /19/22 □/16 /26 □/13 /14 /15 /16 /14 □/18 /19/14 /20 /14 □/13 /41 /40 /14 /20 /29 □/26 /15 □/16 /25 /29 □/13 /14 /15 □ /42 /26 /31 /14 /24 □/43 /41 /40 /23/15 /26 □/18 /20 /29 /29 /22 □/42 /20 /14 /23/19/44 /45 /46/47/48 /49/50/51 /49/52/48
/45 /46 /48 /49 /53/54
/55 /56 /48/46 /54
/55 /46/49/54 /48 /57/58/49/51 /46
/59 /51/56 /58 /46 /51/60
Figure 2.4-3: Amenities
11 SANTA CLARA PARK | Irvine Company Apartment Development | City of Santa Clara PD Rezoning Application 2 | Land Use

SANTA CLARA PARK

PROJECT CIRCULATION DIAGRAM

MISSION COLLEGE BLVD

FREEDOM CIRCLE

FREEDOM CIRCLE

FREEDOM CIRCLE
FUTURE

PUBLIC PARK
(NOT A PART)

EXISTING COMMERCIAL
(NOT A PART)

EXISTING COMMERCIAL
(NOT A PART)

EXISTING COMMERCIAL
(NOT A PART)
BLDG 1
BLDG 2
BLDG 3
BLDG 5
BLDG 4
Pool
Pool
AMERICA PKWY.

HICHBORN DR.

GREAT
101-FREEWAY-OFFRAMP
SANTA CLARA PARK January 24, 2025 L10
Legend

PROJECT CIRCULATION DIAGRAM
0 50 100
Primary Pedestrian Connection Point
Public Pedestrian Path
San Tomas Aquinos Trail
Freedom Circle and Mission College Blvd.

Bike Lane
Private Street 'A' Bike Lane
Vehicular Garage Entry
Vehicular / Bike Connection
Loading Zone
Existing Crosswalk
Proposed Crosswalk
Retail
Mailroom
Amenity
6' Pedestrian Walk
(Class I Shared-use Path)
(Class IV Bike Path)
(Class II Bike Path on Both Sides of Street)

MISSION COLLEGE BLVD

FREEDOM CIRCLE

FREEDOM CIRCLE

FREEDOM CIRCLE
FUTURE

PUBLIC PARK
(NOT A PART)

EXISTING COMMERCIAL
(NOT A PART)

EXISTING COMMERCIAL
(NOT A PART)

EXISTING COMMERCIAL
(NOT A PART)
BLDG 1
BLDG 2
BLDG 3
BLDG 5
BLDG 4
Pool
Pool
AMERICA PKWY.

HICHBORN DR.

GREAT
101-FREEWAY-OFFRAMP
Primary Gateway
Secondary Gateway
Primary Bike / Pedestrian Connection Point
Figure 2.5: Project Circulation
12 SANTA CLARA PARK | Irvine Company Apartment Development | City of Santa Clara PD Rezoning Application 2 | Land Use

2.5 Mobility
13 SANTA CLARA PARK | Irvine Company Apartment Development | City of Santa Clara PD Rezoning Application 2 | Land Use

2.6 Transportation Demand Mangement
TDM Program
This chapter provides details on the TDM
measures offered to onsite residents, employees
(leasing office and maintenance), and visitors.

The measures are designed to allow visitors and
residents to reduce single occupancy vehicle
trips to and from the development. To gauge the
effectiveness of the TDM program monitoring
and evaluation of the program will occur as
described in the Monitoring and Reporting
section. The goal of the TDM program is to
reduce vehicle miles travelled (VMT) by 20%,
with 10% from project design features, and 10%
from active TDM measures per the city’s Climate
Action Plan (2022).

TDM Strategies
The TDM strategies offered to Santa Clara
Park residents, employees, and visitors include
measures to encourage transit use, ridesharing,
walking, biking, and car sharing for commute
trips as well as trips off-site during the day. There
is a strong emphasis on providing tools and
information to residents to help them plan their
commute by bike, transit, or ride-sharing as well
as encouraging them to use these modes both to
and from the site as well as internally within the
site. Visitors are also provided with information
about alternative modes to the site. (Figure 2.6)
illustrates the strategies that are provided to
Santa Clara Park in terms of physical design
features and TDM programs and services.

Housing Density and Destination Accessibility
As mentioned in the project description, the
Santa Clara Park Redevelopment Project would
construct 1,792 residential dwelling units (15%
affordable units) of the 2,500 dwelling units
remaining in the Focus Area Plan, or 70% of
the remaining residential units allowed under
the Focus Area Plan. The 25.7-acre site with
427,380 square feet of existing office space will
be replaced by 1,792 residential units with over
nine acres of public and private recreation and
open space. Santa Clara Park is near major
destinations, including Levi’s Stadium, Great
America Theme Park, Santa Clara Convention
Center, employment clusters in Santa Clara and
North San Jose, and Mission College west of
the Project site on Mission College Boulevard.

Destination accessibility is measured in terms of
the number of jobs or other attractions reachable
within a given travel time, which tends to be
the highest at central locations and lowest at
peripheral ones. Proximity to major destinations
reduces vehicle trip lengths, thereby reducing
VMT. It also increases the potential for people to
walk and bike to these destinations and therefore
reduces Project-generated VMT.