Cities Index.
Agenda

Stanton City Council
June 10, 2025

Document
Agenda
Meeting
June 10, 2025
Body
Stanton City Council
Pages
206
Original file
62.8 MB
Text extracted from the city's file for reading and search. Open the original on www.stantonca.gov. That file is the official record.

APPROVED AS TO FORM:

ALL BARLOW, CITY ATTORNEY
o
ATTEST:

I, Brenda Green, City Clerk of the City of Stanton, California DO HEREBY CERTIFY that the foregoing Resolution, being Resolution No. 2011- 19 has been duly signed by the Mayor and attested by the City Clerk, all at a regular meeting of the Stanton City Council, held on April 12, 2011, and that the same was adopted, signed and approved by the following vote to wit:

AYES: Donahue, Ethans, Royce, Shawver
NOES: None
ABSENT: Warren
ABSTAIN: None
o
DA\~ ~

BRENDA GREEN, ITY CLERK
o
RESOLUTION NO. 2011- 19

Page 2 of 2 ends

RESOLUTION NO. 2025-14

Page 1 of 2 ends

RESOLUTION NO. 2025-14

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF STANTON CONCERNING

THE STATUS AND UPDATE OF THE CIRCULATION ELEMENT, AND MITIGATION FEE PROGRAM FOR THE MEASURE M (M2) PROGRAM
WHEREAS, the City of Stanton desires to maintain and improve the streets within its jurisdiction, including those arterials contained in the Master Plan of Arterial Highways (MPAH); and
WHEREAS, the City of Stanton has endorsed a definition of and process for, determining consistency of the City’s Traffic Circulation Plan with the MPAH; and WHEREAS, the City has adopted a General Plan Circulation Element which does not preclude implementation of the MPAH within its jurisdiction; and WHEREAS, the City is required to adopt a resolution biennially informing the Orange County Transportation Authority (OCTA) that the City’s Circulation Element is in conformance with the MPAH and whether any changes to any arterial highways of said Circulation Element have been adopted by the City during Fiscal Years 2023-24 and FY 2024-25; and
WHEREAS, the City is required to send biennially to the OCTA all recommended changes to the City Circulation Element and the MPAH for the purposes of re-qualifying for participation in the Comprehensive Transportation Funding Programs; and WHEREAS, the City is required to adopt a resolution biennially certifying that the City has an existing Mitigation Fee Program that assess traffic impacts of new development and requires new development to pay a fair share of necessary transportation improvements attributable to the new development.

NOW, THEREFORE, BE IT RESOLVED that the City Council for the City of Stanton, does hereby inform OCTA that:

A. The arterial highway portion of the Circulation Element of the City is in conformance with the MPAH.

B. The City attests that no unilateral reduction in through lanes has been made on any MPAH arterials during FY 2023-24 and FY 2024-25.

C. The City affirms that it will bring forward requests to amend the MPAH, when necessary, in order to ensure that the MPAH and the General Plan Circulation Element remain consistent.

D. The City reaffirms that the existing Mitigation Fee Program is in effect.

Attachment: E
Click here to return to the agenda.

RESOLUTION NO. 2025-14

Page 2 of 2 ends

PASSED, APPROVED AND ADOPTED this 10th day of June, 2025.

DAVID J. SHAWVER, MAYOR
APPROVED AS TO FORM:

HONGDAO NGUYEN, CITY ATTORNEY
ATTEST:

I, Patricia A. Vazquez, City Clerk of the City of Stanton, California DO HEREBY CERTIFY that the foregoing Resolution, being Resolution No. 2025-14 has been duly signed by the Mayor and attested by the City Clerk, all at a regular meeting of the Stanton City Council, held on June 10, 2025, and that the same was adopted, signed and approved by the following vote to wit:

AYES:

NOES:

ABSENT:

ABSTAIN:

PATRICIA A. VAZQUEZ, CITY CLERK

CITY OF STANTON

GENERAL PLAN UPDATE PROGRAM EIR
Exhibit 5.4-1
Roadway Classifi cations

NOT TO SCALE
09/08 • JN 10-106202
1 The following activities are statutorily-exempt from deficiency determinations: interregional travel, traffic generated by the provision of low and very low income housing, construction rehabilitation or maintenance of facilities that impact the system, freeway ramp metering, traffic signal coordination by the state or multi-jurisdictional agencies, traffic generated by high-density residential development within 1/4 mile of a fixed-rail passenger station, traffic generated by mixed-use residential development within 1/4 mile of a fixed-rail passenger station.

Jurisdiction:

CMP Monitoring Checklist: Level of Service (LOS)
CMP Checklist YES NO N/A

1. Check "Yes" if either of the following apply:  
• There are no CMP intersections in your jurisdiction.
• Factoring out statutorily-exempt activities1, all CMP intersections within your jurisdiction are operating at LOS E (or the baseline level, if worse than E) or better.

NOTE: ONLY THOSE AGENCIES THAT CHECKED "NO" FOR QUESTION 1 NEED TO ANSWER THE REMAINING QUESTIONS.

2. If any, please list those intersections that are not operating at the CMP LOS standards.  • •
•

3. Will deficient intersections, if any, be improved by mitigation measures to be implemented in the next 18 months or improvements programmed in the first year of any recent funding program (i.e. local jurisdiction CIP, Measure M CIP)?   
a. If not, has a deficiency plan been developed for each intersection that will be operating below the CMP LOS standards?   
Additional Comments:

APPENDIX C
Congestion Management Program (CMP)
Attachment: F
Click here to return to the agenda.
2 The following activities are statutorily-exempt from deficiency determinations: interregional travel, traffic generated by the provision of low and very low income housing, construction rehabilitation or maintenance of facilities that impact the system, freeway ramp metering, traffic signal coordination by the state or multi-jurisdictional agencies, traffic generated by high-density residential development within 1/4 mile of a fixed-rail passenger station, traffic generated by mixed-use residential development within 1/4 mile of a fixed-rail passenger station.

APPENDIX C
Congestion Management Program (CMP)
CMP Monitoring Checklist: Deficiency Plans
CMP Checklist YES NO N/A

1. Check "Yes" if either of the following apply:  
• There are no CMP intersections in your jurisdiction.
• Factoring out statutorily-exempt activities2, all CMP Highway System (CMPHS) intersections within your jurisdiction are operating at LOS E (or the baseline level, if worse than E) or better.

NOTE: ONLY THOSE AGENCIES THAT CHECKED "NO" FOR QUESTION 1 NEED TO ANSWER THE REMAINING QUESTIONS.
2 If any, please list those intersections that are not operating at the CMP LOS standards.  • •
•

3. Are there improvements to bring these intersections to the CMP LOS standard scheduled for completion during the next 18 months or programmed in the first year of the CIP?    NOTE: ONLY THOSE AGENCIES THAT CHECKED "NO" FOR QUESTION 3 NEED TO ANSWER THE REMAINING QUESTIONS.

4. Has a deficiency plan or a schedule for preparing a deficiency plan been submitted to OCTA?   

5. Does the deficiency plan fulfill the following statutory requirements:
a. Include an analysis of the causes of the deficiency?    b. Include a list of improvements necessary to maintain minimum LOS standards on the CMPHS and the estimated costs of the improvements?    c. Include a list of improvements, programs, or actions and estimates of their costs, which will improve LOS on the CMPHS and improve air quality?    i. Do the improvements, programs, or actions meet the criteria established by South Coast Air Quality Management District (SCAQMD) (see the CMP Preparation Manual)?
  

APPENDIX C
Congestion Management Program (CMP)
CMP Monitoring Checklist: Deficiency Plans (cont.)
CMP Checklist YES NO N/A

6. Are the capital improvements identified in the deficiency plan programmed in your seven-year CIP?   

7. Does the deficiency plan include a monitoring program that will ensure its implementation?   

8. Does the deficiency plan include a process to allow some level of development to proceed pending correction of the deficiency?   

9. Has necessary inter-jurisdictional coordination occurred?   

10. Please describe any innovative programs, if any, included in the deficiency plan:  Additional Comments:

APPENDIX C
Congestion Management Program (CMP)
CMP Monitoring Checklist: Land Use Coordination
CMP Checklist YES NO N/A

1. Have you maintained the CMP traffic impact analysis (TIA) process you selected for the previous CMP?  
a. If not, have you submitted the revised TIA approach and methodology to OCTA for review and approval?   

2. Did any development projects require a CMP TIA during this CMP cycle?3   NOTE: ONLY THOSE AGENCIES THAT CHECKED "YES" FOR QUESTION 2 NEED TO ANSWER THE REMAINING QUESTIONS.

3. If so, how many?

4. Please list any CMPHS links & intersections that were projected to not meet the CMP LOS standards (indicate whether any are outside of your jurisdiction).
•
•
•

a. Were mitigation measures and costs identified for each and included in your sevenyear CIP?    b. If any impacted links & intersections were outside your jurisdiction, did your jurisdiction coordinate with other jurisdictions to develop a mitigation strategy?   

5. If a local traffic model was/will be used, did you follow the data and modeling consistency requirements as described in the CMP Preparation Manual (available online at http://www.octa.net/pdf/cmpprepmanual.pdf)?
  
Additional Comments:
3 Exemptions include: any development generating less than 2,400 daily trips, any development generating less than 1,600 daily trips (if it directly accesses a CMP highway), final tract and parcel maps, issuance of building permits, issuance of certificate of use and occupancy, and minor modifications to approved developments where the location and intensity of project uses have been approved through previous and separate local government actions prior to January 1, 1992.

APPENDIX C
Congestion Management Program (CMP)
CMP Monitoring Checklist: Capital Improvement Program (CIP) CMP Checklist YES NO N/A

1. Did you submit a seven-year CIP to OCTA by June 30?   

2. Does the CIP include projects to maintain or improve the performance of the CMPHS (including capacity expansion, safety, maintenance, and rehabilitation)?   

3. Is it consistent with air quality mitigation measures for transportation-related vehicle emissions?   

4. Was the OCFundtracker CIP provided by OCTA used to prepare the CIP?    Additional Comments:

APPENDIX C
Congestion Management Program (CMP)
OPTIONAL - CMP Monitoring Checklist: Federal Congestion Management CMP Checklist YES NO N/A

1. Does any federally funded project in the CIP result in a significant increase in single occupant vehicle (SOV) capacity?
  
NOTE: ONLY THOSE AGENCIES THAT CHECKED "YES" FOR QUESTION 1 NEED TO ANSWER THE REMAINING QUESTION.

2. If so, was the project developed as part of the federal Congestion Management Process, in other words, was there an appropriate analysis of reasonable travel demand reduction and operational strategies?
  
Additional Comments:

I certify that the information contained in this checklist is true.

Name (Print) Title Signature Date
RESOLUTION NO. 2025-15

Page 1 of 2 ends

RESOLUTION NO. 2025-15

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF STANTON CONCERNING

THE STATUS AND UPDATE OF THE PAVEMENT MANGEMENT PLAN FOR THE MEASURE M (M2) PROGRAM
WHEREAS, the local jurisdiction is required to meet eligibility requirements to submit eligibility verification packages to the Orange County Transportation Authority (OCTA) in order to remain eligible to receive M2 funds; and
WHEREAS, the local jurisdiction is required to adopt and update a Pavement Management Plan (PMP), using the required format, regarding the status of road pavement conditions and implementation of the PMP on a biennial basis; and WHEREAS, the local jurisdiction is required to provide a plan that manages the preservation, rehabilitation, and maintenance of paved roads by analyzing pavement life cycles, assessing overall system performance costs, and determining alternative strategies and costs necessary to improve paved roads.

NOW, THEREFORE, BE IT RESOLVED that the City Council for the City of Stanton, does hereby inform OCTA that:

A. The PMP is in conformance with the PMP Submittal Template provided in the Countywide Pavement Management Plan Guidelines.

B. The City hereby adopts a PMP and has provided an updated PMP report, using the required format, to OCTA.

C. The Public Works Director / City Engineer or designee is authorized to sign the PMP certification form.

PASSED, APPROVED AND ADOPTED this 10th day of June, 2025.

DAVID J. SHAWVER, MAYOR
APPROVED AS TO FORM:

HONGDAO NGUYEN, CITY ATTORNEY
Attachment: G
Click here to return to the agenda.

RESOLUTION NO. 2025-15

Page 2 of 2 ends

ATTEST:

I, Patricia A. Vazquez, City Clerk of the City of Stanton, California DO HEREBY CERTIFY that the foregoing Resolution, being Resolution No. 2025-15 has been duly signed by the Mayor and attested by the City Clerk, all at a regular meeting of the Stanton City Council, held on June 10, 2025, and that the same was adopted, signed and approved by the following vote to wit:

AYES:

NOES:

ABSENT:

ABSTAIN:

PATRICIA A. VAZQUEZ, CITY CLERK

FINAL REPORT

UPDATED CITYWIDE

PAVEMENT MANAGEMENT PLAN
OC Go
2025-2032
Submitted to:

City of Stanton, CA
March 13, 2025
Exhibit: A
Click here to return to the agenda.

March 13, 2025
Mr. Cesar Rangel, P.E.

Public Works Director/City Engineer
City of Stanton
7800 Katella Avenue
Stanton, CA 90680
Subject: City of Stanton – OCTA Pavement Management Compliance Report 2025 Dear Cesar:

As part of the 2025 Update of the Pavement Management Plan (PMP) for the City of Stanton, Bucknam Infrastructure Group, Inc. is pleased to submit the PMP reporting required by the Orange County Transportation Authority (OCTA). This data/report will be submitted to OCTA as part of the City’s required biennial PMP prior to June 30, 2025.

The information contained in this report was used to develop the recommended improvement program for the pavement network. The report covers the following categories:
• Pavement Management Plan Certification
• Quality Assurance / Quality Control (QA/QC) Plan
• Pavement Management Data Files (electronic Stanton.e70 file format) • Pavement Management Plan that includes the following:
• Average Pavement Conditions For Each Segment in the Network (PCI Report) The Pavement Condition Index report shows the present condition of each street in the pavement network (MPAH and Locals). In addition, the report shows the basic geometry of each street segment.
• Seven-year Projected PCI Under Existing Funding Levels This report identifies the projected PCI’s based on the local agencies current funding programs. This report details the PCI projects for the entire network, MPAH roadways and Local streets.
• Seven-year Plan for Road Maintenance and Rehabilitation (Forecasted Maintenance Report)
The Forecasted Maintenance Report projects the street maintenance activities required for the next seven years, broken down to show maintenance levels for all streets. This includes all scheduled projects provided by the City for fiscal years 2025 through 2032.
• Alternative Funding Levels
OCTA has requested two reports indicating the necessary funding to maintain the City’s current weighted average PCI as well as the necessary funding to improve the weighted average PCI by one PCI point over the next seven years. • Backlog by Fiscal Year (re: unfunded restoration, rehabilitation and reconstruction) • Percentage of total network in each of the five condition categories based on centerline mileage
• Local Match Reduction Reporting
 In order to be eligible for Local Match Reduction of 10%, the following must be submitted:
o Measurable improvement of paved road conditions during the previous reporting period defined as an overall weighted (by area) average system improvement of one PCI point.
o No reduction in the overall weighted (by area) average PCI in the MPAH or local street categories
- or –
o Have road pavement conditions, for the overall network, during the previous reporting period within the highest twenty (20%) of the scale for road pavement conditions in conformance with OCTA Ordinance No. 3, defined as a PCI of 75 or higher, otherwise defined as in “good condition”.

These reports will be submitted to the City of Stanton as part of the biennial Pavement Management Plan that is due prior to June 30, 2025. These reports will be packaged in a way that it will be easy for staff to review.

All comments received from the City have been incorporated in the reports that follow. All of the City’s comments and needs that were brought to our attention are included in the report. It has been a pleasure working with you and the City on updating your Pavement Management Plan. We look forward to the continued success of this project and future teamwork with City staff.

Sincerely,
Bucknam Infrastructure Group, Inc.

Peter J. Bucknam
Project Manager
Infrastructure Management – GIS Services
City of Stanton, CA Page i
2025 Citywide Pavement Management Plan – OCTA Submittal Final Report – March 13, 2025

AGENCY SUBMITTAL TABLE OF CONTENTS
I. Pavement Management Plan Certification.............................................................................. 2 II. Executive Summary ................................................................................................................. 3 III. Background ...................................................................................................................... 4 IV. Current Pavement Conditions (PCI)......................................................................................... 9 V. Projected Pavement Conditions (PCI).................................................................................... 10 VI. Alternative Funding Levels..................................................................................................... 11 a. Maintain Existing Average Network PCI .............................................................. 11 b. Improve Average Network PCI............................................................................. 11 VII. Current and Projected Backlog by Year of Pavement Maintenance Needs.......................... 11 VIII. Centerline Mileage................................................................................................................. 12 IX. Percentage of Network in Each of Five Condition Categories Based on Centerline mileage 12 X. Reduction in M2 Local Match................................................................................................ 13 XI. Appendix A – Seven-Year Road Maintenance and Rehabilitation Plan Based on Current or Expected Funding Level .............................................................................. 14 XII. Appendix B – Complete Street Listing Current Conditions.................................................... 15 XIII. Appendix C – GIS Digital Data ................................................................................................ 16 XIV. Appendix D – Quality Assurance / Quality Control Plan........................................................ 17 • Introduction ......................................................................................................... 17 • Objectives ............................................................................................................ 17 • Structure of QA/QC Plan...................................................................................... 18 • Condition Survey Procedures............................................................................... 18 • Accuracy Required for Data Collection................................................................ 19 • Random and Systematic Re-Inspections.............................................................. 19 • PCI Comparison with Past Surveys....................................................................... 20 • Experience of Inspectors...................................................................................... 20 • Safety Procedures................................................................................................ 20 XV. Appendix E – Pavement Management Data Files............................................................. 21 XVI. Appendix F – GIS Maps – Current Conditions................................................................... 22 City of Stanton, CA Page 1
2025 Citywide Pavement Management Plan – OCTA Submittal Final Report – March 13, 2025

CITY OF STANTON PAVEMENT MANAGEMENT PLAN
- part of -

COUNTYWIDE PAVEMENT MANAGEMENT PLAN GUIDELINES
(OCTA Guideline – April 2024)
Prepared by: Bucknam Infrastructure Group, Inc.

Submitted to OCTA: June 30, 2025
City of Stanton, CA Page 2
2025 Citywide Pavement Management Plan – OCTA Submittal Final Report – March 13, 2025
I. Pavement Management Plan Certification
The City of Stanton, CA certifies that is has a Pavement Management Plan in conformance with the criteria stated in the Orange County Transportation Authority Ordinance No. 3. This ordinance requires that a Pavement Management Plan be in place and maintained to qualify for allocation of revenues generated from renewed Measure M (M2).

The plan was developed by Bucknam Infrastructure Group, Inc. using MicroPAVER, a pavement management system conforming to American Society for Testing and Materials (ASTM) Standard D6433, and contains, at a minimum, the following elements:
• Inventory of MPAH and Local routes reviewed and updated biennially. The last update of the inventory was completed on January 2025 for the Arterial (MPAH) and January 2025 for portion of the Local streets;
• Assessment of the pavement condition for all routes in the system, updated biennially. The last field review of the pavement condition was completed in January 2025; • Percentage of all sections of pavement needing:
o Preventive Maintenance = 25%;
o Rehabilitation = 39%;
o Reconstruction = 3%
• Budget needs for preventive maintenance, rehabilitation and/or reconstruction of deficient sections of pavement for:
o Current biennial period $4,000,000
o Following biennial period $3,000,000
• Funds budgeted or available for Preventive Maintenance, Rehabilitation and/or Reconstruction. o Current biennial period $3,000,000;
o Following biennial period $3,000,000
• Backlog by year of unfunded rehabilitation, restoration and reconstruction needs (See page 9); • The Pavement Management Plan is consistent with countywide pavement condition assessment standards as described in the OCTA Countywide Pavement Management Plan Guidelines adopted by the OCTA Board of Directors.
*An electronic copy of the Pavement Management Plan (with MicroPAVER or StreetSaver compatible files) has been or will be submitted with the certification statement. A copy of this certification is being provided to the Orange County Transportation Authority.

Submitted by:
__ Cesar Rangel, PE ______City of Stanton
Name (Print) Jurisdiction
_____________________________ __________
Signed Date
_ Public Works Director / City Engineer
Title
City of Stanton, CA Page 3
2025 Citywide Pavement Management Plan – OCTA Submittal Final Report – March 13, 2025
II. EXECUTIVE SUMMARY
2025 UPDATE OF PAVEMENT MANAGEMENT PLAN (PMP)
As the City of Stanton’s infrastructure continues to mature Public Works priorities such as Local street maintenance and Arterial rehabilitation are key projects to City staff. With the City mostly built-out, wear and tear on the infrastructure will occur at an ever increasing rate. Pavement aging through annual weathering, dynamic and static vehicle loading, and increased usage, compounded with the increased cost of performing maintenance and rehabilitation, add to the yearly operational budget of the pavement network. System sustainability can only be achieved through proactive scheduling and the implementation of cost-efficient pavement applications.

In the upcoming years as the City continues to build upon this study through future inspections and maintenance work history, Stanton pavement data will continue to provide reliable data. This will enhance the PMP through detailed Orange County Transportation Authority (OCTA) OC Go funding analysis, City specific budgetary reporting and level of service reporting.

The Stanton PMP has been developed to assist City personnel by providing current data on the City’s street network and to develop cost-effective maintenance strategies to maintain a desirable level of pavement performance on a network scale, while optimizing the expenditure of limited fiscal resources.

The project consisted of analyzing the City’s 2023 dataset for quality and usability. In doing this, we were tasked to generate an updated Capital Improvement Program report that identified recommendations and deficiencies in the current operating and maintenance efforts put forth by the City.

We surveyed all designated arterial, collector (MPAH) and Local routes this past winter to assist the City in being compliant with OCTA – OC Go April 2024 guidelines. Additionally, we updated the City’s unique Pavement Management – GIS layer that will continue to assist the City in analyzing pavement conditions and other attribute information through the use of MyRoads® and ESRI ArcMap.

Bucknam Infrastructure Group reviewed the City’s previous maintenance efforts, current 2024-25 and proposed FY 2025-26 projects. These street improvements for pertinent pavement information in order to generate a CIP report that identified recommendations and opportunities for improvement in the current operating and maintenance efforts put forth by the City. The result of these work efforts is this report.

City of Stanton, CA Page 4
2025 Citywide Pavement Management Plan – OCTA Submittal Final Report – March 13, 2025
III. BACKGROUND
In late 1990, voters throughout Orange County approved a ½-cent sales tax for transportation improvements known as OC Go, formerly known as Measure M2. Funding for streets and roads are included within the sales tax and are distributed to locals agencies through both formula and a competitive method. In late 2006, the renewal of OC Go was approved by voters that would continue the ½-cent sales tax for thirty additional years, starting in 2011.

The primary of goal of this report is to comply with established guidelines from OCTA to ensure that field data collection and reporting efforts performed by outside consultants or local agency staff are consistent.

This is required in order that funding allocations can be reviewed and based on agency comparable pavement conditions. Specifically, our findings and recommendations provide Public Works administrators, managers and field personnel with:
* PMP report consistent with OCTA OC Go guidelines
* the present condition status of the pavement network (arterial, collector, residential and industrial streets), as a whole and of any grouping or individual component within the City; * a ranked list of all streets, or segments of streets, by condition within the network; * rehabilitation/maintenance needs of each street segment by year; * an optimized priority maintenance and rehabilitation program based on cost/benefit analysis and various levels of funding;
* optimum annual pavement expenditure levels for pavement maintenance for the next seven (7) years;
* prediction of the life-cycle performance of the City’s pavement network and each individual street section; and
* pavement condition data and analysis presented in through MyRoads® and ®ESRI ArcGIS Pavement is a dynamic structure where deterioration is constantly occurring; thus the pavement management system needs to be updated on a regular basis to reflect these changes in pavement conditions, pavement maintenance histories, and maintenance strategies based upon budgetary constraints. In our approach to develop the City’s forecasted maintenance recommendations we worked with Stanton Public Works/Engineering staff in identifying unit costs for all maintenance practices used on an annual basis. Currently, based upon the City’s maintenance practices and their associated unit costs, the total replacement value of the Stanton pavement network is $109,238,200. This value clearly indicates that the City’s pavement network is the most valuable and essential asset to Stanton. The City’s use of slurry seal, AC Overlay and R&R practices are typically applied at a five year, ten year and 25 year frequency respectively subject to funding availability. These frequencies are preferred but if not implemented the City may see increases in deterioration rates due to environmental, load and high average daily traffic (ADT) volumes. For example, high ADT volumes along one of Stanton’s arterial streets will increase deterioration rates for a previously applied AC Overlay compared to a small local street.

These deterioration rates are monitored through frequent inspections and functional class deterioration analysis within the City’s PMP database.

City of Stanton, CA Page 5
2025 Citywide Pavement Management Plan – OCTA Submittal Final Report – March 13, 2025
Additionally, the assessment of the City’s pavement segmentation was one of the key priorities for this project. With two years between major inspections it was essential to verify that all Arterial, Collector, Local, and Alley segmentation was up-to-date and that section SF quantities were verified, accurate and reliable (this was shown as one of the City’s major goals for this project).

This was completed during the 2023 PMP project by utilizing the Bucknam cloud-based learning technology (AI) to correctly quantify square footages for each pavement section (see sample below).

Bucknam utilized the City
of Stanton’s most recent
aerial image; in doing so,
all AC and PCC pavement
“true” areas were
calculated. These
calculations are possible
due to the technologies
working knowledge of
how to recognize define
pavement segmentation,
edge of pavement to edge of pavement limits and surface types.

This work effort allowed Bucknam to obtain the necessary quality control measurements for all Stanton PMP segments and to perform segment SF variance and correction analysis. This in turn created a more accurate total centerline / square footage totals and improved PCI calculations for the Stanton PMP network as well as enhanced the budgetary projections within this report (FY 2025-32).

City of Stanton, CA Page 6
2025 Citywide Pavement Management Plan – OCTA Submittal Final Report – March 13, 2025
Stanton MyRoads® PMP Web-Portal Bucknam’s proprietary MyRoads® is a great match for the Stanton PMP today and the future. Our application brings your PMP data to life within a dynamic dashboard! Bucknam now provides all our
PMP clients with a unique and
agency driven “MyRoads®” webportal that provides instantaneous access to your pavement
management database. This
“dashboard” allows users to toggle
through individual sections via GIS
Lasso map selections, zone
queries, rank selection and PCI
ranges to review all section
metrics, latest/previous
inspections, work histories and
filtered PCI reports. To cap it off,
your selections/queries also
generate preliminary engineering
costs estimations for slurry,
overlay and reconstruction
projects and provides you with the
predictive PCI as if the work is
complete.

Bucknam has shown, your
Stanton MyRoads® account actively working!
This tool will be accessed by City staff simply through a Username/Password methodology. As changes are made to the Stanton PMP database the MyRoads® dataset is changed to reflect work history edits, PCI inspections and section changes.

In summary, MyRoads® allows the user perform the following dynamic functions:
• Query specific pavement segment(s) to view current/historic PCI, work history inspection; • Filter for pavement sections within a defined zone, PCI range and/or functional class; • Select a pavement section or grouping of section through the on-board GIS tool; • Enter slurry, overlay & reconstruction unit costs to determine preliminary cost of maintenance and resulting citywide PCI
o Display critical street / sidewalk / ROW assets along pavement section(s) that are critical to Engineering Bid development and solicitation (ADA ramps, utilities, manholes, trees, etc.
• Displays all final GIS project maps (PCI, work history, 7-yr forecasted maintenance, etc.) • Bucknam will train Stanton staff on the simply use of the MyRoads® dashboard.

City of Stanton, CA Page 7
2025 Citywide Pavement Management Plan – OCTA Submittal Final Report – March 13, 2025

FINDINGS AND RECOMMENDATIONS
Through our assessment of historical maintenance performed within the City as well as the conditional data found across the network clearly shows that a continued funding mechanisms need to occur on the Stanton PMP network. Pavement management involves frequent preventive maintenance; as pavement deteriorates through heavy traffic impacts, weathering and time, preventive maintenances (such as slurry seal, stop gap, etc.) have limited benefits. More aggressive maintenance applications have to be used.

Our study has shown, at a minimum, that key overlay projects will be needed immediately over the next several years to maintain the network’s level of condition. Currently, the City’s Local network holds moderate and/or average weighted PCI values; it is our recommendation that a proactive, common sense overlay program and a continued slurry seal program be scheduled over the next several fiscal years. This will ensure that the citywide weighted PCI will sustain itself and allow for routine slurry seal maintenance to continue. We have found and recommend the following detailed items which should be reviewed and considered for a proactive approach to the future management of the PMP:

ARTERIAL / COLLECTOR (MPAH) FINDINGS AND RECOMMENDATIONS The actual workload requirements identified indicate that the Arterial (MPAH) street network is currently in “Good” condition. To maintain this condition, it is critical that preventive maintenance and overlay activities are funded at the levels identified on page 11 to maintain a “good” network weighted average PCI value. Our MPAH findings for conditional data and recommendations for revenue expenditures are shown below:
• The Arterial / Collector (MPAH) network has a weighted PCI of 85.5 • The MPAH network consists of 12.0 centerline miles and 3,421,539 SF of pavement; • Currently, 18% of the MPAH network (2.1 centerline miles) qualify for slurry seal/stop gap maintenance; 27% of the Arterial network (3.2 centerline miles) qualify for rehabilitation/reconstruction maintenance;
o With Arterial/Collector conditions showing approximately 3.2 miles of streets in need of major rehabilitation or reconstruction a proactive and Arterial/Collector CIP program needs to be implemented and sustained;
• At a minimum, MPAH maintenance projects should focus on the maintaining the current PCI above a weighted average of 80 over the next 7 years;
o Maintain Arterial PCI by providing revenues at the $324,400/yr level for the term of the CIP to generate the projects identified on page 11 (Maintain Budget); • Increase funding and develop a proactive approach to identify MPAH overlay projects based on the deterioration modeling within MicroPAVER;
o Utilizing current funding levels will allow the MPAH weighted PCI of 85.5 to remain at a high value (82.6) and decrease the citywide backlog from $12.2 million to $12.1 million over the next seven years;
City of Stanton, CA Page 8
2025 Citywide Pavement Management Plan – OCTA Submittal Final Report – March 13, 2025
• Perform pavement inspections on the MPAH network every two years to continue the City’s solid planning model within MicroPAVER to track PCI deterioration; also follows new OCTA guidelines for Measure M2.

LOCAL FINDINGS AND RECOMMENDATIONS
The actual workload requirements identified indicate that the Local street network is currently in “fair” condition. At a minimum, it is critical that preventive maintenance and overlay activities are funded at the levels identified on page 11 to maintain a “fair” network weighted average PCI value. Our Local network findings for conditional data and recommendations for revenue expenditures are shown below:
• The Local network has a weighted PCI of 73.4;
• The Local network consists of 32.7 centerline miles and 5,754,386 SF of pavement; • Currently, 19% of the Local network (6.2 centerline miles) qualifies for slurry seal/stop gap maintenance; 28% of the Local network (9.1 centerline miles) qualify for rehabilitation/reconstruction maintenance;
o With Local conditions showing approximately 9.1 miles of streets in need of major rehabilitation or reconstruction a proactive and aggressive Local CIP program needs to be implemented and sustained;
• At a minimum, Local maintenance projects should focus on the maintaining the current PCI above a weighted average of 75 over the next 7 years;
o Maintain Local PCI by providing revenues at the $1,099,000 Million/yr level for the term of the CIP to generate the projects identified on page 11 (Maintain Budget); • Increase funding and develop a proactive approach to identify Local overlay projects based on the deterioration modeling within MicroPAVER;
o Utilizing current funding levels will increase the Local weighted PCI of 73.4 to 76.6 and decrease the citywide backlog from $12.2 million to $12.1 million over the next seven years;
• Perform pavement inspections on the Local network every year (following the City’s maintenance zone schedule) to continue the City’s solid planning model within MicroPAVER to track PCI deterioration; also follows new OCTA guidelines for Measure M2; • Place more emphasis on increasing the Local funding appropriations for the next several years to achieve the results shown on page 11 (Increase PCI Budget).

City of Stanton, CA Page 9
2025 Citywide Pavement Management Plan – OCTA Submittal Final Report – March 13, 2025
IV. CURRENT PAVEMENT CONDITIONS (PCI)
City of Stanton, CA Page 10
2025 Citywide Pavement Management Plan – OCTA Submittal Final Report – March 13, 2025
V. PROJECTED PAVEMENT CONDITIONS (PCI)
City of Stanton, CA Page 11
2025 Citywide Pavement Management Plan – OCTA Submittal Final Report – March 13, 2025
VI. ALTERNATIVE FUNDING LEVELS
Maintain Existing Average Network PCI
Improve Average Network PCI
VII. CURRENT AND PROJECTED BACKLOG BY YEAR OF PAVEMENT

MAINTENANCE NEEDS

DEFERRED MAINTENANCE
Delaying repairs on streets where pavement conditions indicate a need generates deferred maintenance or “backlog”. Deferred maintenance is work that is postponed to a future budget cycle, or until funds are available. As maintenance is deferred, the opportunity to apply preventive, life extending pavement treatments is forfeited and the ultimate cost of rehabilitation multiplies (i.e. slurry seal costs to overlay costs). By using the City’s pavement maintenance applications and their associated unit costs, when a budgetary model is exercised within the PMP software the amount of deferred maintenance is calculated. Based upon the available budget applied to the model, deferred maintenance will increase or decrease.

As maintenance is deferred, the opportunity to apply life extending preventive pavement applications is lost and the ultimate cost of rehabilitation multiples.

City of Stanton, CA Page 12
2025 Citywide Pavement Management Plan – OCTA Submittal Final Report – March 13, 2025
In the case of Stanton, the City’s current annual funding through FY 2031-32 will continue to maintain the amount of deferred maintenance / backlog on the network at $12.1 million level by FY 2032.

VIII. CENTERLINE MILEAGE
IX. PERCENTAGE OF NETWORK IN EACH OF FIVE CONDITION CATEGORIES

BASED ON CENTERLINE MILES
City of Stanton, CA Page 13
2025 Citywide Pavement Management Plan – OCTA Submittal Final Report – March 13, 2025
X. REDUCTION IN M2 LOCAL MATCH
A local agency match reduction of 10% of the eligible cost for projects submitted for consideration of funding through the M2 Comprehensive Transportation Funding Programs (CTFP) call for projects is available if the local agency either:
a. Shows measurable improvement of paved road conditions during the previous reporting period defined as an overall weighted (by area) average system improvement of one Pavement Condition Index (PCI) point with no reduction in the overall weighted (by area) average PCI in the Master Plan of Arterial Highways (MPAH) or local categories:
or
b. Have road pavement conditions during the previous reporting period, within the highest 20% of the scale for road pavement conditions in conformance with OCTA Ordinance No. 3, defined as a PCI of 75 or higher, otherwise defined as in “good condition”.

Road conditions found through our 2025 PMP management study shows that the City is eligible for Local Match Reduction based on the current network weighted PCI of 78.0 (the system is showing PCI proactivity/increase across the network from last 2023 PMP report).

City of Stanton, CA Page 14
2025 Citywide Pavement Management Plan – OCTA Submittal Final Report – March 13, 2025
XI. APPENDIX A – SEVEN YEAR ROAD MAINTENANCE AND REHABILITATION

PLAN BASED ON CURRENT OR EXPECTED FUNDING LEVEL
City of Stanton, CA
Forecast Maintenance / Rehabilitation (FMR) Report - FY 2025-2032 Sorted by Rank, FY, Name Order (A-Z)
FY BranchID Sec ID Name From To Rank Surface Type Shoulder Zone Lanes L W True Area PCI % Load % Climate % Other Maint. Type Total $ Arterials / Collectors
2025-26 WESTR 3460 WESTERN AVE Cerritos Ave RR Tracks C AC C&G 8 4 1,268 60 78,730 48 43 44 13 2" Grind-Overlay $346,412 2025-26 WESTR 3465 WESTERN AVE RR Tracks Katella Ave C AC C&G 8 4 1,255 60 76,699 44 52 36 12 ARHM $375,825 155,429 $722,237
2026-27 CER 700 CERRITOS AVE Beach Blvd (EB) Fern Ave (EB) C AAC C&G 8 2 1,240 30 28,238 59 46 47 7 ARHM $144,014 2026-27 CER 702 CERRITOS AVE Fern Ave (EB) Dale Ave (EB) C AAC C&G 8 2 1,330 22 32,091 70 24 44 32 2" Grind-Overlay $146,977 2026-27 CER 704 CERRITOS AVE Dale Ave (WB) Fern Ave (WB) C AAC C&G 8 2 1,330 22 36,190 43 57 28 15 ARHM $184,569 96,519 $475,560
2027-28 KAT EB 1710 KATELLA AVE EB Western Ave RR Tracks C AC C&G 8 3 790 36 29,400 46 74 26 0 ARHM $155,820 2027-28 KAT EB 1712 KATELLA AVE EB RR Tracks Cedar St C AC C&G 8 3 975 36 40,796 61 55 45 0 ARHM $216,219 70,196 $372,039
2028-29 CHAP 772 CHAPMAN AVE Briarwood St (EB Only) Dale St (EB Only) C AC C&G 8 2 690 40 26,954 73 30 66 4 2" Grind-Overlay $133,422 2028-29 CHAP 774 CHAPMAN AVE Dale St (EB Only) City Limit (EB Only) C AC C&G 8 2 565 40 21,029 78 8 84 8 2" Grind-Overlay $104,094 47,983 $237,516
2029-30 KAT EB 1700 KATELLA AVE EB Knott Ave Bradford St C AC C&G 8 3 1,560 40 64,664 55 52 45 3 ARHM $370,525 64,664 $370,525
2030-31 KAT EB 1705 KATELLA AVE EB Bradford St Western Ave C AC C&G 8 3 1,205 40 49,499 61 53 47 0 ARHM $295,014 49,499 $295,014
2031-32 KAT WB 1775 KATELLA AVE WB Bradford St Knott Ave C AC C&G 8 3 1,560 40 63,865 57 41 59 0 2" Grind-Overlay $355,728 63,865 $355,728
Locals
2025-26 ACA 10 ACACIA AVE Beach Blvd Court St E AC C&G 3 2 620 36 21,465 48 77 14 9 1.5" Mill-Overlay $85,431 2025-26 ACA 15 ACACIA AVE Court St Fern St E AC C&G 3 2 625 36 21,649 58 50 22 28 1.5" Mill-Overlay $86,163 2025-26 ASB 180 ASBURY AVE Idyllwild Dr Thunderbird Ln E AC C&G 7 2 790 34 25,941 54 59 41 0 1.5" Mill-Overlay $103,245 2025-26 ASH 210 ASHDALE ST Chanticleer Rd Cul-De-Sac E AC C&G 5 2 150 40 6,847 77 42 58 0 Type II Slurry $3,150 2025-26 CARL 560 CARLTON WY Penn Way Bradford Pl E AC C&G 1 2 105 30 1,908 64 40 46 14 1.5" Mill-Overlay $7,594 2025-26 CARM 580 CARMEL DR Westcliff Dr San Marcos Dr E AC C&G 3 2 285 20 7,409 69 54 28 18 Type II Slurry $3,408 2025-26 CED 640 CEDAR ST Chester Ave Katella Ave E AC C&G 6 2 255 34 8,889 80 44 56 0 Type II Slurry $4,089 2025-26 CED 650 CEDAR ST Katella Ave South End E AAC C&G 1 2 590 40 24,750 73 73 27 0 Type II Slurry $11,385 2025-26 CHE 785 CHESTER AVE Flower Ave Beach Blvd E AC C&G 6 2 280 33 9,165 53 48 37 15 1.5" Mill-Overlay $36,477 2025-26 COUR 950 COURT AVE Monroe Ave Cul-De-Sac (N) E AC C&G 4 2 275 36 11,027 58 68 20 12 1.5" Mill-Overlay $43,887 2025-26 COUR 960 COURT AVE Monroe Ave South End E AC C&G 4 2 340 36 12,112 67 52 48 0 1.5" Mill-Overlay $48,206 2025-26 COURT 1040 COURTRIGHT RD Cody Dr City Limit (N) E AC C&G 6 2 500 34 16,393 52 81 19 0 1.5" Mill-Overlay $65,244 2025-26 GAR 1430 GARRET RD Syracuse Ave Mitchell Dr E AC C&G 6 2 360 36 12,875 82 18 82 0 Type II Slurry $5,923 2025-26 GEN 1450 GENTRY WAY Bradford Pl End E AC C&G 1 2 150 30 3,775 71 27 41 32 Type II Slurry $1,737 2025-26 HAM 1500 HAMDEN AVE Middlesex Dr Cul-De-Sac E AC C&G 7 2 312 34 12,396 49 53 47 0 1.5" Mill-Overlay $49,336 2025-26 HAMP 1530 HAMPTON WY Fulton Way Lambert Way E AC C&G 1 2 990 30 20,547 60 72 20 8 1.5" Mill-Overlay $81,777 2025-26 HARR 1550 HARRIET ST Yana Dr Cul-De-Sac E AC C&G 5 2 430 34 16,835 50 71 29 0 1.5" Mill-Overlay $67,003 2025-26 HOV 1580 HOOVER ST City Limit (N/ Garden Grove Blvd) Cul-De-Sac E AC C&G 3 2 625 36 24,468 53 43 48 9 1.5" Mill-Overlay $97,383 2025-26 KEN 1820 KENMORE ST Stardust Ln South End E AC C&G 4 2 180 30 5,206 65 15 85 0 1.5" Mill-Overlay $20,720 2025-26 MAI 2240 MAIN ST Chestnut Ave Court Ave E AC C&G 4 2 330 52 16,526 77 72 28 0 Type II Slurry $7,602 2025-26 MAI 2242 MAIN ST Court Ave Sycamore Ave E AC C&G 4 2 330 52 16,568 85 22 78 0 Type II Slurry $7,621 2025-26 MAI 2245 MAIN ST Sycamore Ave Fern Ave E AC C&G 4 2 310 52 15,460 79 49 51 0 Type II Slurry $7,112 2025-26 MAL 2250 MALIBU DR Capistrano Dr Del Rey E AC C&G 3 2 85 20 5,415 62 54 21 25 1.5" Mill-Overlay $21,552 2025-26 MAS 2300 MASTERSON ST Cody Dr City Limit E AC C&G 6 2 500 34 16,779 71 57 43 0 1.5" Mill-Overlay $66,780 2025-26 MON 2350 MONROE AVE Beach Blvd Court Ave E AC C&G 4 2 600 40 22,607 60 43 56 1 1.5" Mill-Overlay $89,976 2025-26 MON 2355 MONROE AVE Court Ave Stanton Storm Channel E AC C&G 4 2 1,075 40 42,405 62 55 45 0 1.5" Mill-Overlay $168,772 2025-26 SEN 2970 SENTRY ST Cody Dr Cul-De-Sac E AC C&G 6 2 423 34 15,785 61 60 27 13 1.5" Mill-Overlay $62,824 2025-26 SHA 2980 SHADOW LN Briarwood St Cul-De-Sac E AC C&G 3 2 155 40 7,447 77 51 49 0 Type II Slurry $3,426 2025-26 SHER 3030 SHERRILL ST Cerritos Ave Tina Way E AC C&G 4 2 635 32 20,668 53 47 46 7 1.5" Mill-Overlay $82,259 2025-26 SHER 3035 SHERRILL ST Tina Way Pacific Ave E AC C&G 4 2 350 32 9,303 68 42 55 3 Type II Slurry $4,279 2025-26 SON 3040 SONNET ST Lola Ave Winston Rd E AC C&G 5 2 392 36 12,796 78 28 72 0 Type II Slurry $5,886 465,416 $1,350,245
2026-27 ALBCH 3660 Alley b/w Beach and Chestnut Chester Ave Katella Ave O AC 4 1 235 15 3,525 43 30 61 9 1.5" Mill-Overlay $14,594

Page 1 of 5 ends

City of Stanton, CA
Forecast Maintenance / Rehabilitation (FMR) Report - FY 2025-2032 Sorted by Rank, FY, Name Order (A-Z)
FY BranchID Sec ID Name From To Rank Surface Type Shoulder Zone Lanes L W True Area PCI % Load % Climate % Other Maint. Type Total $ 2026-27 ALBCH 3662 Alley b/w Beach and Chestnut Cerritos Ave Main St O AC 4 1 585 15 8,775 48 78 21 1 1.5" Mill-Overlay $36,329 2026-27 ALBCH 3664 Alley b/w Beach and Chestnut Main St Pacific St O AC 4 1 540 15 8,100 46 43 49 8 1.5" Mill-Overlay $33,534 2026-27 ALBCO 3605 Alley b/w Camus Ln and Orrway Dr Lampson Ave Samura Pl O AC 3 1 375 20 7,500 39 65 34 1 1.5" Mill-Overlay $31,050 2026-27 SNTP 2900 SANTA PAULA AVE Santa Rita Ave Stanton Ave E AC C&G 2 2 830 34 28,791 70 51 49 0 Type II Slurry $13,820 2026-27 SNTRO 2920 SANTA ROSALIA AVE Lampson Ave Bently Ave E AC C&G 3 2 1,270 34 42,174 47 74 10 16 1.5" Mill-Overlay $174,600 2026-27 SNTRO 2925 SANTA ROSALIA AVE Bently Ave City Limits (Vanguard Cir) E AC C&G 3 2 1,030 34 34,724 50 77 23 0 1.5" Mill-Overlay $143,757 2026-27 SNTRO 2930 SANTA ROSALIA AVE Chapman Ave Santa Catalina Ave E AC 2 2 1,245 34 42,180 78 26 70 4 Type II Slurry $20,246 2026-27 VIAI 3340 VIA IRANA Via Jacara Cul-De-Sac E AC C&G 7 2 1,807 37 68,397 84 55 41 4 1.5" Mill-Overlay $283,164 2026-27 AUS 270 AUSTIN WAY Cabot Way End E AC C&G 1 2 125 20 2,722 81 0 100 0 Type II Slurry $1,307 2026-27 BAN 290 BANFF ST Winston Rd Cul-De-Sac E AC C&G 5 2 139 40 6,640 83 0 100 0 Type II Slurry $3,187 2026-27 BEE 320 BEECHWOOD WY Sandalwood Way End E AC C&G 6 2 530 20 10,823 84 6 57 37 Type II Slurry $5,195 2026-27 BEV 360 BEVER PL Beach Blvd End (Private Road) E AC 2 2 630 36 21,598 71 0 23 77 Type II Slurry $10,367 2026-27 BRAP 410 BRADFORD PL Bradford St Katella Ave E AC 1 2 980 36 37,109 65 41 59 0 1.5" Mill-Overlay $153,631 2026-27 BRA 440 BRAESWOOD WY Aspen Way Sandalwood Way E AC C&G 6 2 315 20 8,340 71 58 32 10 Type II Slurry $4,003 2026-27 BRAG 450 BRAGG WY Fulton Way Penn Way E AC C&G 1 2 185 30 5,130 51 72 28 0 1.5" Mill-Overlay $21,238 2026-27 FER 1290 FERN ST City Limit (N) Starr St E AC C&G 5 2 350 32 10,685 71 58 42 0 Type II Slurry $5,129 2026-27 FER 1295 FERN ST Starr St Chanticleer Rd E AC C&G 5 2 865 35 27,815 64 59 41 0 1.5" Mill-Overlay $115,154 2026-27 FER 1300 FERN ST Chanticleer Rd Cerritos Ave E AC C&G 5 2 760 36 24,735 54 81 19 0 1.5" Mill-Overlay $102,403 2026-27 FIE 1330 FIELDGATE ST Georgian St City Limit (Bently Ave) E AC C&G 3 2 460 34 14,616 76 77 23 0 Type II Slurry $7,016 2026-27 FIR 1350 FIRST ST Beach Blvd Cul-De-Sac E AC C&G 6 2 798 34 27,742 74 46 39 15 Type II Slurry $13,316 2026-27 SNTG 2840 SANTA GERTRUDES AVE Santa Rosalia Ave Santa Paula Ave E AC C&G 2 2 1,220 32 40,593 83 0 100 0 Type II Slurry $19,485 2026-27 SNTMO 2880 SANTA MONICA AVE Santa Cruz Ave Santa Paula Ave E AC C&G 2 2 820 34 29,074 60 71 25 4 1.5" Mill-Overlay $120,366 2026-27 VIAK 3370 VIA KANNELA Via Jacara Cul-De-Sac E AC C&G 7 2 837 34 30,799 89 0 83 17 1.5" Mill-Overlay $127,508 2026-27 WINST 3520 WINSTON ST Kenmore St Magnolia Ave E AC 5 1 260 17 3,995 82 52 48 0 Type II Slurry $1,918 2026-27 WYA 3540 WYATT RD Cody Dr Cul-De-Sac E AC C&G 6 2 445 34 18,001 69 52 35 13 Type II Slurry $8,640 2026-27 YAN 3560 YANA DR Lola Ave Chanticleer Rd E AC C&G 5 2 953 36 31,720 84 2 73 25 Type II Slurry $15,226 2026-27 YAN 3570 YANA DR Chanticleer Rd Cerritos Ave E AC C&G 5 2 810 36 27,021 70 56 44 0 Type II Slurry $12,970 623,324 $1,499,152
2027-28 ALCLU 3695 Alley b/w Lullaby and Cerritos Yana Dr West End O AC 5 1 120 20 2,400 40 52 38 10 1.5" Mill-Overlay $10,320 2027-28 ALCLU 3696 Alley b/w Lullaby and Cerritos Yana Dr East End O AC 5 1 550 20 11,000 22 54 37 9 AC Recon $133,870 2027-28 ALOKCD 3638 Alley b/w Oak and Cedar Chester Ave Katella Ave O AC 6 1 240 15 3,600 53 32 38 30 1.5" Mill-Overlay $15,480 2027-28 ALORLE 3622 Alley b/w Orangewood and Lessue Lenmar St East End O AC 2 1 245 20 4,900 22 47 53 0 AC Recon $59,633 2027-28 ALYTP 130 Alley b/w Tina and Pacific Sherrill St Magnolia Ave O AC 4 1 1,116 20 22,320 36 68 27 5 1.5" Mill-Overlay $95,976 2027-28 ALESNT 3700 Alley e/ Sentry Dr 2nd St North End O AC 6 1 215 25 5,375 38 52 48 0 1.5" Mill-Overlay $23,113 2027-28 CAB 490 CABOT WY Lambert Way Austin Way E AC C&G 1 2 110 30 3,725 85 1 99 0 Type II Slurry $1,863 2027-28 CAB 492 CABOT WY Lambert Way West End E AC C&G 1 2 85 30 1,846 81 0 80 20 Type II Slurry $923 2027-28 CAMU 510 CAMUS LN Lampson Ave Samura Pl E AC C&G 3 2 420 36 15,195 82 16 77 7 Type II Slurry $7,598 2027-28 HYNE 1620 HYNES Beach Blvd Private Gate E AC C&G 2 2 186 32 6,752 77 6 94 0 Type II Slurry $3,376 2027-28 IDY 1630 IDYLLWILD DR Asbury Ave Courson Dr E AC C&G 7 2 225 34 8,245 51 75 23 2 1.5" Mill-Overlay $35,454 2027-28 IDY 1635 IDYLLWILD DR Courson Dr Ramblewood Dr E AC C&G 7 2 225 34 7,816 47 75 25 0 1.5" Mill-Overlay $33,609 2027-28 IDY 1638 IDYLLWILD DR Ramblewood Dr Western Ave E AC C&G 7 2 220 34 7,523 53 59 41 0 1.5" Mill-Overlay $32,349 2027-28 IDY 1640 IDYLLWILD DR Western Ave End E AC C&G 6 2 381 36 13,410 43 66 26 8 1.5" Mill-Overlay $57,663 2027-28 JAN 1670 JANE WAY Orangewood Ave Pickens St E AC C&G 4 2 995 34 32,410 79 0 89 11 Type II Slurry $16,205 2027-28 OAK 2390 OAK ST Katella Ave Central Ave E AC C&G 6 2 580 34 21,728 55 55 32 13 1.5" Mill-Overlay $93,430 2027-28 PAC 2490 PACIFIC ST Beach Blvd Fern Ave E AC C&G 4 2 1,270 32 46,298 81 0 64 36 Type II Slurry $23,149 2027-28 PAR 2530 PARK PLAZA Beach Blvd Cul-De-Sac E AC C&G 3 2 285 40 12,376 48 74 6 20 1.5" Mill-Overlay $53,217 2027-28 PEN 2540 PENN WY Bragg Way Carlton Way E AC C&G 1 2 260 30 8,199 50 90 10 0 1.5" Mill-Overlay $35,256 2027-28 PIC 2560 PICKENS LN Jane Way Pine Tree Ln E AC C&G 4 2 225 34 9,148 76 0 53 47 Type II Slurry $4,574 2027-28 PIN 2570 PINE TREE LN Orangewood Ave End E AC C&G 4 2 1,095 34 36,546 73 0 62 38 Type II Slurry $18,273 2027-28 STAN 3075 STANFORD AVE Court St Fern St E AC C&G 3 2 670 32 21,358 46 61 27 12 1.5" Mill-Overlay $91,839 2027-28 STARR 3110 STARR ST Beach Blvd Lotus Ct E AC C&G 5 2 645 36 22,170 54 58 42 0 1.5" Mill-Overlay $95,331 2027-28 STARR 3115 STARR ST Lotus Ct Fern Ave E AC C&G 5 2 590 36 22,516 42 79 16 5 1.5" Mill-Overlay $96,819 2027-28 STARR 3120 STARR ST Fern Ave Vantage St E AC C&G 5 2 210 38 7,531 69 76 24 0 Type II Slurry $3,766 2027-28 SYC 3160 SYCAMORE AVE Stanford Ave Acacia Ave E AC C&G 3 2 600 36 20,701 47 68 13 19 1.5" Mill-Overlay $89,014 375,088 $1,132,098
2028-29 CHES 800 CHESTNUT AVE Central Ave Katella Ave E AC C&G 4 2 262 36 15,174 80 65 28 7 Type II Slurry $7,890 2028-29 CHES 830 CHESTNUT AVE Main St Pacific St E AC C&G 4 2 550 36 23,545 67 86 14 0 1.5" Mill-Overlay $105,482

Page 2 of 5 ends

City of Stanton, CA
Forecast Maintenance / Rehabilitation (FMR) Report - FY 2025-2032 Sorted by Rank, FY, Name Order (A-Z)
FY BranchID Sec ID Name From To Rank Surface Type Shoulder Zone Lanes L W True Area PCI % Load % Climate % Other Maint. Type Total $ 2028-29 COD 840 CODY DR Western Ave Courtright Rd E AC C&G 6 2 765 32 24,281 50 89 11 0 1.5" Mill-Overlay $108,779 2028-29 COD 845 CODY DR Courtright Rd Sentry Dr E AC C&G 6 2 720 32 23,345 60 77 23 0 1.5" Mill-Overlay $104,586 2028-29 COU 890 COURSON DR Syracuse Ave Cul-De-Sac E AC C&G 7 2 122 40 5,877 85 0 65 35 Type II Slurry $3,056 2028-29 COU 900 COURSON DR Idyllwild Dr Cul-De-Sac (N) E AC C&G 7 2 268 34 12,212 51 50 50 0 1.5" Mill-Overlay $54,710 2028-29 COU 920 COURSON DR Lowell Cul-De-Sac E AC C&G 7 2 116 34 5,842 52 39 61 0 1.5" Mill-Overlay $26,172 2028-29 COUR 1000 COURT AVE Stanford Ave Acacia Ave E AC C&G 3 2 600 36 22,951 72 73 21 6 Type II Slurry $11,935 2028-29 COUR 1010 COURT AVE Acacia Ave Garden Grove Blvd E AC C&G 3 2 630 36 22,249 53 61 34 5 1.5" Mill-Overlay $99,676 2028-29 COUR 1020 COURT AVE Orangewood Ave Plaza Way E AC C&G 4 2 600 36 14,106 83 0 70 30 Type II Slurry $7,335 2028-29 COUR 980 COURT AVE Main St Pacific St E AC C&G 4 2 545 36 17,627 83 0 60 40 Type II Slurry $9,166 2028-29 COUR 990 COURT AVE Chester Ave Katella Ave E AC C&G 4 2 265 25 6,461 64 89 5 6 1.5" Mill-Overlay $28,945 2028-29 COURLN 1025 COURT LN Orangewood Ave End E AC 2 2 135 36 4,641 67 0 100 0 Type II Slurry $2,413 2028-29 KATELLA FR 1780 KATELLA FRONTAGE RD Katella Ave (W) Mac St E AC 4 3 760 28 22,088 82 19 68 13 Type II Slurry $11,486 2028-29 KATELLA FR 1782 KATELLA FRONTAGE RD Mac St Katella Ave (E) E AC 4 3 500 28 14,011 84 0 100 0 Type II Slurry $7,286 2028-29 KEL 1800 KELTON WAY Hampton Way Burton Way E AC C&G 1 2 125 30 3,522 62 63 26 11 1.5" Mill-Overlay $15,779 2028-29 LAM 1930 LAMBERT WAY Auburn Way Fulton Way E AC C&G 1 2 215 30 6,402 79 56 38 6 Type II Slurry $3,329 2028-29 LEA 2000 LEAFWOOD ST Briarwood St Winterwood Ave E AC C&G 3 2 805 34 28,466 49 87 13 0 1.5" Mill-Overlay $127,528 2028-29 LEN 2020 LENMAR AVE Davmor Ave Orangewood Ave E AC C&G 1 2 266 33 8,910 64 56 40 4 1.5" Mill-Overlay $39,917 2028-29 LEN 2030 LENMAR AVE Orangewood Ave Lessue Ave E AC C&G 2 2 426 33 14,688 56 60 36 4 1.5" Mill-Overlay $65,802 2028-29 LOWDEN 2130 LOWDEN ST Cerritos Ave Thunderbird Ln E AC C&G 7 2 1,135 34 37,256 51 54 44 2 1.5" Mill-Overlay $166,907 2028-29 LOWDEN 2140 LOWDEN ST Syracuse Ave Bock Ave E AC C&G 7 2 535 34 17,802 82 14 86 0 Type II Slurry $9,257 2028-29 LOWELL 2150 LOWELL ST Asbury Ave Ramblewood Dr E AC C&G 7 2 480 36 16,759 60 46 54 0 1.5" Mill-Overlay $75,080 2028-29 LOWELL 2160 LOWELL ST Lowden St Litchfield Ave E AC C&G 7 2 170 34 7,623 56 61 39 0 1.5" Mill-Overlay $34,151 2028-29 RAM 2650 RAMBLEWOOD DR Lowell St Thunderbird Ln E AC C&G 7 2 362 34 12,345 54 57 43 0 1.5" Mill-Overlay $55,306 2028-29 RAM 2660 RAMBLEWOOD DR Syracuse Ave Cul-De-Sac E AC C&G 7 2 119 40 5,812 83 14 86 0 Type II Slurry $3,022 2028-29 ROY 2730 ROYAL OAK WAY Evergreen Way Summertree Ln E AC C&G 6 2 235 20 7,062 84 8 14 78 Type II Slurry $3,672 2028-29 VAN 3300 VANTAGE ST Chanticleer Rd Cul-De-Sac E AC C&G 5 2 150 40 6,874 64 68 32 0 1.5" Mill-Overlay $30,796 2028-29 VAN 3310 VANTAGE ST Lola Ave Winston Rd E AC C&G 5 2 350 36 13,633 72 59 41 0 Type II Slurry $7,089 2028-29 VER 3330 VERONA ST Stardust Lane End E AC C&G 4 2 180 30 5,232 63 7 89 4 Type II Slurry $2,721 2028-29 WEST 3440 WESTCLIFF DR Del Rey Dr Carmel Dr E AC C&G 3 2 835 20 17,613 60 50 43 7 1.5" Mill-Overlay $78,906 2028-29 WIN 3500 WINSTON RD Dale Ave Vantage St E AC C&G 5 2 1,025 36 34,187 76 43 56 1 Type II Slurry $17,777 2028-29 WINST 3510 WINSTON ST Sherrill St Cul-De-Sac E AC 5 1 607 17 10,860 82 0 100 0 Type II Slurry $5,647 489,456 $1,331,601
2029-30 BRI 460 BRIARWOOD ST Catherine Ave Winterwood Ave E AC C&G 3 2 550 36 19,130 51 75 12 13 1.5" Mill-Overlay $89,146 2029-30 BRI 462 BRIARWOOD ST Winterwood Ave Brittany Ln E AC C&G 3 2 890 36 31,788 47 78 10 12 1.5" Mill-Overlay $148,132 2029-30 BRI 464 BRIARWOOD ST Brittany Ln Chapman Ave E AC C&G 3 2 725 36 25,264 54 77 23 0 1.5" Mill-Overlay $117,730 2029-30 CHA 740 CHANTICLEER RD Dale Ave MacDuff St E AC C&G 5 2 935 36 30,991 35 82 15 3 1.5" Mill-Overlay $144,418 2029-30 CHA 750 CHANTICLEER RD Fern Ave Dale Ave E AC C&G 5 2 1,265 36 41,155 45 74 26 0 1.5" Mill-Overlay $191,782 2029-30 CRI 1050 CRIS AVE Magnolia Ave Vinevale St E AC C&G 4 2 545 36 19,443 82 39 61 0 Type II Slurry $10,499 2029-30 DEL 1140 DEL REY DR Malibu Dr Westcliff Dr E AC C&G 3 2 310 20 6,525 68 64 32 4 1.5" Mill-Overlay $30,407 2029-30 DOG 1160 DOGWOOD WAY Sandalwood Way End E AC C&G 6 2 105 30 2,473 78 18 82 0 Type II Slurry $1,335 2029-30 ELE 1240 ELECTRIC WAY Court Ave Cul-De-Sac E AC C&G 4 2 690 36 33,846 66 58 38 4 1.5" Mill-Overlay $157,722 2029-30 EME 1250 EMERSON WAY Bradford Pl Fulton Way E AC C&G 1 2 175 30 5,217 44 44 36 20 1.5" Mill-Overlay $24,311 2029-30 LUL 2170 LULLABY LN Yana Dr Cul-De-Sac E AC C&G 5 2 455 34 16,793 42 77 23 0 1.5" Mill-Overlay $78,255 2029-30 MACST 2185 MAC ST Katella Frontage City Limits E AC 4 2 110 32 3,088 24 58 21 21 AC Recon $40,638 2029-30 SAND 2790 SANDALWOOD WAY Beechwood Way Rose St E AC C&G 6 2 1,195 24 22,436 77 35 32 33 Type II Slurry $12,115 258,149 $1,046,492
2030-31 ARR 160 ARROWHEAD ST Winterwood Ave City Limit E AC C&G 3 2 1,050 36 38,967 71 80 17 3 Type II Slurry $21,822 2030-31 ASP 240 ASPEN WAY Braeswood Way End E AC C&G 6 2 105 20 2,552 83 86 14 0 Type II Slurry $1,429 2030-31 AUG 260 AUGUSTA WAY Marhsall Way End E AC C&G 1 2 86 30 2,195 78 0 100 0 Type II Slurry $1,229 2030-31 BRAS 420 BRADFORD ST Katella Ave Rutledge Ave E AC C&G 1 2 216 36 8,423 84 33 67 0 Type II Slurry $4,717 2030-31 BRIT 470 BRITTANY LN Briarwood St Cul-De-Sac E AC C&G 3 2 370 38 13,923 84 16 84 0 Type II Slurry $7,797 2030-31 CAR 550 CARLA ST Georgian St Cul-De-Sac E AC C&G 3 2 385 34 14,927 69 82 18 0 Type II Slurry $8,359 2030-31 CAT 600 CATHERINE AVE Beach Blvd Briarwood St E AC C&G 3 2 650 36 23,075 69 71 11 18 Type II Slurry $12,922 2030-31 LAG 1920 LAGUNA CT Westcliff Dr End E AC C&G 3 2 115 20 4,255 69 38 30 32 1.5" Mill-Overlay $20,594 2030-31 LAN 1980 LANDERS WAY College Dr End E AC C&G 6 2 125 20 2,740 71 42 58 0 Type II Slurry $1,534 2030-31 LAU 1990 LAURELTON AVE Santa Rosalia Ave City Limit (E) E AC C&G 3 2 310 34 10,690 81 49 51 0 Type II Slurry $5,986 2030-31 LEE 2010 LEE WAY College Dr Scripps Way E AC C&G 6 2 285 20 4,267 64 74 21 5 1.5" Mill-Overlay $20,652

Page 3 of 5 ends

City of Stanton, CA
Forecast Maintenance / Rehabilitation (FMR) Report - FY 2025-2032 Sorted by Rank, FY, Name Order (A-Z)
FY BranchID Sec ID Name From To Rank Surface Type Shoulder Zone Lanes L W True Area PCI % Load % Climate % Other Maint. Type Total $ 2030-31 LES 2040 LESSUE AVE Santa Rosalia Stanton Ave E AC C&G 2 2 1,520 33 50,134 58 76 24 0 1.5" Mill-Overlay $242,649 2030-31 LIT 2070 LITCHFIELD AVE Lowell St Cul-De-Sac E AC C&G 7 2 291 34 11,607 57 61 39 0 1.5" Mill-Overlay $56,178 2030-31 ROS 2680 ROSE ST Katella Ave Chester Ave E AC C&G 6 2 260 34 9,025 82 30 70 0 Type II Slurry $5,054 2030-31 ROS 2690 ROSE ST Chester Ave Central Ave E AC C&G 6 2 280 34 10,588 81 56 44 0 Type II Slurry $5,929 2030-31 ROS 2700 ROSE ST Central Ave Monroe Ave E AC C&G 6 2 290 34 10,667 79 24 76 0 Type II Slurry $5,974 2030-31 ROS 2710 ROSE ST Monroe Ave North End E AC C&G 6 2 230 34 7,827 83 27 73 0 Type II Slurry $4,383 2030-31 RUT 2740 RUTGERS WAY College Dr End E AC C&G 6 2 120 20 1,975 82 0 100 0 Type II Slurry $1,106 2030-31 RUTH 2750 RUTHANN AVE Santa Rosalia Ave Stanton Ave E AC C&G 1 2 1,520 33 51,752 81 1 96 3 Type II Slurry $28,981 2030-31 STANT 3080 STANTON AVE Santa Catalina Ave Cul-De-Sac E AC C&G 2 2 1,220 28 38,140 55 64 23 13 1.5" Mill-Overlay $184,598 2030-31 STAR 3100 STARDUST LN Sherrill St Magnolia Ave E AC C&G 4 2 1,120 30 35,522 62 0 96 4 1.5" Mill-Overlay $171,926 2030-31 SYL 3180 SYLVAN ST Stardust Lane End E AC C&G 4 2 180 30 5,291 76 32 68 0 Type II Slurry $2,963 2030-31 SYR 3210 SYRACUSE AVE Knott Ave Lowden St E AC C&G 7 2 1,465 32 46,390 82 50 50 0 Type II Slurry $25,978 2030-31 SYR 3220 SYRACUSE AVE Western Ave Mitchell Dr E AC C&G 6 2 619 36 22,491 80 29 71 0 Type II Slurry $12,595 2030-31 TAM 3230 TAMARACK WAY Sandalwood Way End E AC C&G 6 2 150 30 3,938 84 9 69 22 Type II Slurry $2,205 2030-31 TEM 3240 TEMPLE WAY College Dr End E AC C&G 6 2 95 20 1,424 84 0 100 0 Type II Slurry $797 2030-31 TIN 3260 TINA WY Sherrill St Magnolia Ave E AC C&G 4 2 1,110 30 29,269 66 64 36 0 1.5" Mill-Overlay $141,662 2030-31 TRI 3270 TRINITY WY College Dr End E AC C&G 6 2 120 20 2,009 82 30 70 0 Type II Slurry $1,125 2030-31 VAS 3320 VASSAR WY College Dr South End E AC C&G 6 2 255 20 4,027 56 83 14 3 1.5" Mill-Overlay $19,491 2030-31 VIL NB 3390 VILLAGE CENTR DR NB City Limit Beach Blvd E AC C&G 3 2 1,320 23 38,742 84 0 33 67 Type II Slurry $21,696 2030-31 WAB 3410 WABASH WAY Landers Way End E AC C&G 6 2 95 20 1,497 84 0 100 0 Type II Slurry $838 2030-31 WAS 3420 WASCO RD Lola Ave Chanticleer Rd E AC C&G 5 2 870 34 28,911 65 80 20 0 1.5" Mill-Overlay $139,929 2030-31 YAL 3550 YALE WAY Lee Way East End E AC C&G 6 2 185 20 3,891 81 48 52 0 Type II Slurry $2,179 541,131 $1,185,278
2024-25 ALYFB 80 Alley b/w Flower and Beach Cerritos Ave Main St O AC 6 1 580 20 11,600 18 63 32 5 AC Recon $165,068 2024-25 ALYVM 90 Alley b/w Magnolia and Vinevale Cris Ave Pacific Ave O AC 4 1 353 20 7,060 53 38 60 2 1.5" Mill-Overlay $35,582 2031-32 CEN 660 CENTRAL AVE Date St Cedar St E AC C&G 6 2 636 36 22,530 85 0 100 0 Type II Slurry $13,067 2031-32 CEN 665 CENTRAL AVE Cedar St Flower Ave E AC C&G 6 2 640 36 22,715 84 0 100 0 Type II Slurry $13,175 2031-32 CEN 668 CENTRAL AVE Flower Ave Beach Blvd E AC C&G 6 2 285 36 10,439 83 31 69 0 Type II Slurry $6,055 2031-32 CHES 820 CHESTNUT AVE Cerritos Ave Main St E AC C&G 4 2 600 36 24,006 48 90 10 0 1.5" Mill-Overlay $120,990 2031-32 COU 930 COURSON DR Idyllwild Dr Cul-De-Sac (S) E AC C&G 7 2 256 34 8,021 46 54 46 0 1.5" Mill-Overlay $40,426 2031-32 CUS 1060 CUSTER WAY Bradford Pl Grant Way E AC C&G 1 2 280 30 5,987 64 86 14 0 1.5" Mill-Overlay $30,174 2031-32 DAN 1110 DANA WAY College Dr End E AC C&G 6 2 120 20 1,815 85 0 100 0 Type II Slurry $1,053 2031-32 DAT 1120 DATE ST Katella Ave Summerwood Ln E AC C&G 6 2 1,000 34 31,917 79 28 72 0 Type II Slurry $18,512 2031-32 DRA 1180 DRAKE WAY College Dr End E AC C&G 6 2 125 20 1,868 82 16 84 0 Type II Slurry $1,083 2031-32 DRE 1190 DREW WAY College Dr Vassar Way E AC C&G 6 2 280 20 4,829 74 84 16 0 Type II Slurry $2,801 2031-32 DUK 1200 DUKE WAY College Dr End E AC C&G 6 2 120 20 1,637 82 0 100 0 Type II Slurry $949 2031-32 EIL 1220 EILEEN ST Santa Rosalia Stanton Ave E AC C&G 1 2 1,520 33 50,514 80 0 94 6 Type II Slurry $29,298 2031-32 EMO 1260 EMORY WAY College Dr End E AC C&G 6 2 120 20 2,279 80 0 89 11 Type II Slurry $1,322 2031-32 EWE 1280 EWELL WAY Rutledge Ave Hardee Way E AC C&G 1 2 230 30 6,866 76 0 6 94 Type II Slurry $3,982 2031-32 LAM 1940 LAMBERT WAY Fulton Way Longford Way E AC C&G 1 2 110 18 1,631 30 89 11 0 1.5" Mill-Overlay $8,220 2031-32 MARISA 2270 MARISA ST Georgian St Cul-De-Sac E AC C&G 3 2 190 34 8,321 81 62 38 0 Type II Slurry $4,826 2031-32 MARS 2290 MARSHALL WY Grant Way Bradford Pl E AC C&G 1 2 329 30 7,578 80 9 91 0 Type II Slurry $4,395 2031-32 MER 2310 MERCANTILE AVE Industrial Ave Katella Ave E AC C&G 1 2 475 37 16,596 84 49 51 0 Type II Slurry $9,626 2031-32 MIL 2330 MILLS WAY College Dr End E AC C&G 6 2 120 20 1,895 81 23 77 0 Type II Slurry $1,099 2031-32 MON 2358 MONROE AVE Stanton Storm Channel Dale Ave E AC C&G 4 2 880 40 35,251 45 64 36 0 1.5" Mill-Overlay $177,665 2031-32 NAP 2370 NAPA WY College Dr End E AC C&G 6 2 120 20 1,734 61 78 22 0 1.5" Mill-Overlay $8,739 2031-32 PAC 2480 PACIFIC ST Rose St Beach Blvd E AC C&G 6 2 680 36 21,703 83 50 50 0 Type II Slurry $12,588 2031-32 PAL 2520 PALAIS RD Fern Ave Sonnet St E AC C&G 5 2 1,005 36 34,063 83 28 72 0 Type II Slurry $19,757 2031-32 QUE 2590 QUEENS WAY College Dr End E AC C&G 6 2 133 20 1,981 82 15 85 0 Type II Slurry $1,149 2031-32 RAM 2630 RAMBLEWOOD DR Cerritos Ave Idyllwild Dr E AC C&G 7 2 315 36 11,060 40 75 25 0 1.5" Mill-Overlay $55,742 2031-32 RAM 2640 RAMBLEWOOD DR Idyllwild Dr Cul-De-Sac E AC C&G 7 2 156 34 8,093 41 52 39 9 1.5" Mill-Overlay $40,789 2031-32 ROS 2670 ROSE ST Cerritos Ave Pacific St E AAC C&G 6 2 965 36 34,513 46 58 18 24 1.5" Mill-Overlay $173,946 2031-32 SNTM 2850 SANTA MARIA ST Santa Gertrudes Ave Santa Catalina Ave E AC C&G 2 2 1,040 34 36,052 83 16 84 0 Type II Slurry $20,910 2031-32 SNTP 2890 SANTA PAULA AVE Chapman Ave Santa Rita Ave E AC C&G 2 2 370 33 12,776 79 54 46 0 Type II Slurry $7,410 2031-32 SNTR 2910 SANTA RITA AVE Santa Cruz Ave Santa Paula Ave E AC C&G 2 2 820 34 28,879 70 61 39 0 Type II Slurry $16,750 2031-32 SNTRO 2940 SANTA ROSALIA AVE Orangewood Ave Joel Ave E AC C&G 1 2 882 37 32,232 84 0 97 3 Type II Slurry $18,695 2031-32 SCR 2950 SCRIPPS WAY College Dr Yale Way E AC C&G 6 2 120 20 1,892 85 0 73 27 Type II Slurry $1,097

Page 4 of 5 ends

City of Stanton, CA
Forecast Maintenance / Rehabilitation (FMR) Report - FY 2025-2032 Sorted by Rank, FY, Name Order (A-Z)
FY BranchID Sec ID Name From To Rank Surface Type Shoulder Zone Lanes L W True Area PCI % Load % Climate % Other Maint. Type Total $ 2031-32 SHE 3000 SHERMAN WAY Newton Way North End E AC C&G 1 2 90 30 1,965 84 0 33 67 Type II Slurry $1,140 2031-32 SHER 3010 SHERRILL ST Lola Ave North End E AC 5 2 112 33 3,287 84 0 100 0 Type II Slurry $1,906 2031-32 STA 3060 STANDUSTRIAL ST Dale Ave West End E AC C&G 4 2 945 36 34,843 73 77 23 0 Type II Slurry $20,209 2031-32 TRO 3280 TROJAN WAY Fulton Way End E AC C&G 1 2 135 30 3,059 46 71 11 18 1.5" Mill-Overlay $15,417 553,487 $1,105,613

Page 5 of 5 ends

City of Stanton, CA Page 15
2025 Citywide Pavement Management Plan – OCTA Submittal Final Report – March 13, 2025
XII. APPENDIX B – COMPLETE STREET LISTING CURRENT CONDITIONS City of Stanton, CA
Pavement Condition Index (PCI) Report - All Streets
Sorted by Rank, Name Order (A-Z)
BranchID Sec ID Name From To Rank Surface Type Shoulder Zone Lanes L W True Area PCI % Load % Climate % Other Insp. Date Work History Type Work History Date Arterials / Collectors
CER 680 CERRITOS AVE Knott Ave Lowden St C AC C&G 8 4 1,345 60 75,397 100 0 0 0 1/8/25 Slurry Seal 8/1/10 CER 685 CERRITOS AVE Lowden St Western Ave C AC C&G 8 4 1,325 60 78,386 100 0 0 0 1/9/25 Slurry Seal 8/1/10 CER 690 CERRITOS AVE Western Ave Peppertree Ln C AC C&G 8 4 1,290 60 76,064 100 0 0 0 1/10/25 Slurry Seal 8/1/10 CER 695 CERRITOS AVE Peppertree Ln Beach Blvd C AC C&G 8 4 1,320 60 79,044 100 0 0 0 1/10/25 Slurry Seal 8/1/10 CER 700 CERRITOS AVE Beach Blvd (EB) Fern Ave (EB) C AAC C&G 8 2 1,240 30 28,238 100 0 0 0 2/27/25 Overlay - AC Structural 2/27/25 CER 702 CERRITOS AVE Fern Ave (EB) Dale Ave (EB) C AAC C&G 8 2 1,330 22 32,091 100 0 0 0 2/27/25 Overlay - AC Structural 2/27/25 CER 704 CERRITOS AVE Dale Ave (WB) Fern Ave (WB) C AAC C&G 8 2 1,330 22 36,190 100 0 0 0 2/27/25 Overlay - AC Structural 2/27/25 CER 706 CERRITOS AVE Fern Ave (WB) Beach Blvd (WB) C AAC C&G 8 2 1,240 30 44,212 100 0 0 0 2/27/25 Overlay - AC Structural 2/27/25 CER 710 CERRITOS AVE Dale Ave City Limit (170' W/ Sherrill St) C AAC C&G 8 4 1,330 60 78,951 94 0 89 11 1/14/25 Mill, Overlay w/Fabric (1.5 in) 4/8/19 CER 715 CERRITOS AVE City Limits (Sylvan St) City Limits (Alley 142) C AC 8 4 160 60 9,658 63 39 38 23 1/28/25 New Construction - Initial 1/1/80 CER 720 CERRITOS AVE City Limit (350' W/ Magnolia) Magnolia Ave C AAC C&G 8 4 355 60 20,684 84 0 100 0 1/28/25 Slurry Seal 8/1/10 CER 730 CERRITOS AVE Magnolia Ave City Limit (1110' E/ Magnolia Ave) C AC C&G 8 4 1,110 60 65,795 93 0 100 0 1/28/25 Surface Treatment - Slurry Seal 12/31/22 CHAP 760 CHAPMAN AVE City Limit (210' W/ Santa Paula) Beach Blvd C AAC C&G 8 5 565 80 44,050 99 0 100 0 12/9/24 Surface Treatment - Slurry Seal 12/31/22 CHAP 770 CHAPMAN AVE Beach Blvd Briarwood St C AC C&G 8 4 1,915 70 130,002 96 0 100 0 12/9/24 ARHM Overlay (1.5 in) 12/31/22 CHAP 772 CHAPMAN AVE Briarwood St (EB Only) Dale St (EB Only) C AC C&G 8 2 690 40 26,954 73 30 66 4 1/28/25 New Construction - Initial 7/1/04 CHAP 774 CHAPMAN AVE Dale St (EB Only) City Limit (EB Only) C AC C&G 8 2 565 40 21,029 78 8 84 8 1/28/25 New Construction - Initial 7/1/04 DAL 1070 DALE AVE City Limit (150' N/ Lola) Chanticleer Rd C AC C&G 8 4 1,190 60 70,443 98 0 100 0 12/12/24 ARHM Overlay (1.5 in) 12/31/22 DAL 1075 DALE AVE Chanticleer Rd Cerritos Ave C AC C&G 8 4 800 60 46,808 98 0 100 0 12/12/24 ARHM Overlay (1.5 in) 12/31/22 DAL 1080 DALE AVE Cerritos Ave RR Tracks C AAC C&G 8 4 1,310 60 78,047 94 0 100 0 12/12/24 Overlay - AC Structural 1/1/21 DAL 1085 DALE AVE RR Tracks Katella Ave C AAC C&G 8 4 1,270 60 75,982 100 0 0 0 12/12/24 Overlay - AC Structural 11/4/24 DAL 1086 DALE AVE Katella Ave City Limits (S) C AC 8 3 820 60 12,299 93 0 100 0 1/28/25 ARHM Overlay (1.5 in) 12/31/22 DAL 1090 DALE AVE Chapman Ave Amy Ave C AAC C&G 8 4 455 45 24,321 74 71 29 0 1/23/25 ARHM Overlay (2.0 W/LEVEL) 12/14/10 DAL 1092 DALE AVE Amy Ave Blanche Ave C AAC C&G 8 2 320 32 11,293 88 30 70 0 1/21/25 ARHM Overlay (2.0 W/LEVEL) 12/14/10 DAL 1095 DALE AVE Blanche Ave (SB Only) City Limits (SB Only) C AAC C&G 8 2 510 32 14,668 94 0 78 22 1/21/25 ARHM Overlay (2.0 W/LEVEL) 12/14/10 GGB 1420 GARDEN GROVE BLVD Beach Blvd Fern Ave B AAC 8 4 1,295 80 92,739 92 59 41 0 1/8/25 ARHM Overlay (1.5 in) 12/31/22 KAT EB 1700 KATELLA AVE EB Knott Ave Bradford St C AC C&G 8 3 1,560 40 64,664 55 52 45 3 1/27/25 SLURRY SEAL 1/31/15 KAT EB 1705 KATELLA AVE EB Bradford St Western Ave C AC C&G 8 3 1,205 40 49,499 61 53 47 0 1/27/25 SLURRY SEAL 1/31/15 KAT EB 1710 KATELLA AVE EB Western Ave RR Tracks C AC C&G 8 3 790 36 29,400 46 74 26 0 1/27/25 SLURRY SEAL 1/31/15 KAT EB 1712 KATELLA AVE EB RR Tracks Cedar St C AC C&G 8 3 975 36 40,796 61 55 45 0 1/27/25 SLURRY SEAL 1/31/15 KAT EB 1715 KATELLA AVE EB Cedar St Beach Blvd C AC C&G 8 3 820 36 38,271 69 44 52 4 1/27/25 SLURRY SEAL 1/31/15 KAT EB 1720 KATELLA AVE EB Beach Blvd Pvmnt Change (250' W/ Boatman Av) C AAC C&G 8 3 1,445 45 61,493 83 22 63 15 1/27/25 SLURRY SEAL 1/31/15 KAT EB 1725 KATELLA AVE EB Pvmnt Change (250' W/ Boatman Av) Dale Ave C AAC C&G 8 3 1,120 45 54,348 99 0 100 0 1/27/25 Overlay - AC Thin 3/20/09 KAT EB 1730 KATELLA AVE EB City Limits (560' W/ Mac Murray St) City Limits (260' E/ Mac Murray St) A AC 8 3 815 35 32,627 90 64 36 0 1/28/25 ARHM Overlay (1.5 in) 12/31/22 KAT EB 1735 KATELLA AVE EB City Limits (200' W/ Magnolia St) Magnolia St A AC 8 3 250 52 11,427 93 36 64 0 1/28/25 ARHM Overlay (1.5 in) 12/31/22 KAT WB 1738 KATELLA AVE WB Magnolia Ave City Limits (200' W/ Magnolia St) A AC 8 3 250 34 9,765 97 0 100 0 1/28/25 ARHM Overlay (1.5 in) 12/31/22 KAT WB 1740 KATELLA AVE WB City Limits (260' E/ Mac Murray St) City Limits (560' W/ Mac Murray St) A AC 8 3 840 33 29,157 93 0 100 0 1/28/25 ARHM Overlay (1.5 in) 12/31/22 KAT WB 1750 KATELLA AVE WB Dale Ave Pvmnt Change (250' W/ Boatman Av) C AAC C&G 8 3 1,120 45 46,861 99 0 100 0 1/27/25 SLURRY SEAL 1/31/15 KAT WB 1755 KATELLA AVE WB Pvmnt Change (250' W/ Boatman Av) Beach Blvd C AAC C&G 8 3 1,445 45 72,047 76 28 20 52 1/27/25 SLURRY SEAL 1/31/15 KAT WB 1760 KATELLA AVE WB Beach Blvd Cedar St C AC C&G 8 3 820 33 34,447 42 70 30 0 1/27/25 SLURRY SEAL 1/31/15 KAT WB 1762 KATELLA AVE WB Cedar St RR Tracks C AC C&G 8 3 975 38 40,966 54 49 39 12 1/27/25 SLURRY SEAL 1/31/15 KAT WB 1765 KATELLA AVE WB RR Tracks Western Ave C AC C&G 8 3 790 38 35,816 51 69 31 0 1/27/25 SLURRY SEAL 1/31/15 KAT WB 1770 KATELLA AVE WB Western Ave Bradford St C AC C&G 8 3 1,205 40 50,369 65 48 51 1 1/27/25 SLURRY SEAL 1/31/15 KAT WB 1775 KATELLA AVE WB Bradford St Knott Ave C AC C&G 8 3 1,560 40 63,865 57 41 59 0 1/27/25 SLURRY SEAL 1/31/15 KNO 1890 KNOTT AVE City Limit (N) Cerritos Ave B AC C&G 8 4 426 80 33,873 86 38 62 0 1/28/25 Mill, Overlay w/Fabric (1.5 in) 3/25/19 KNO 1900 KNOTT AVE Cerritos Ave Kermore Ln B AC C&G 8 4 1,625 80 129,910 88 83 16 1 1/27/25 Mill, Overlay w/Fabric (1.5 in) 4/8/19 KNO 1905 KNOTT AVE Kermore Ln Katella Ave B AC C&G 8 4 890 80 90,825 88 78 19 3 1/27/25 Mill, Overlay w/Fabric (1.5 in) 4/8/19 KNO 1910 KNOTT AVE Katella Ave City Limit (S) B AC C&G 8 4 1,215 80 101,751 89 0 76 24 1/20/25 Grind and Overlay (2") 3/25/19 LAMP 1960 LAMPSON AVE City Limit (W) Beach Blvd C AC C&G 8 4 1,755 60 103,740 77 76 24 0 1/21/25 Mill, Overlay w/Fabric (1.5 in) 4/8/19 LAMP 1970 LAMPSON AVE Beach Blvd City Limit (E) C AC C&G 8 4 930 60 58,507 93 0 15 85 1/21/25 ARHM Overlay (1.5 in) 12/31/22 MAG 2210 MAGNOLIA AVE City Limits (130' N/ Cerritos Ave) Cerritos Ave B AAC C&G 8 4 165 80 13,847 94 0 100 0 1/28/25 Mill, Overlay w/Fabric (1.5 in) 4/8/19 MAG 2212 MAGNOLIA AVE Cerritos Ave Pacific Ave B AAC C&G 8 4 975 80 76,991 91 26 66 8 1/28/25 Mill, Overlay w/Fabric (1.5 in) 4/8/19 MAG 2215 MAGNOLIA AVE Pacific Ave RR Tracks B AAC C&G 8 4 325 80 25,721 82 69 24 7 1/28/25 Mill, Overlay w/Fabric (1.5 in) 4/8/19 MAG 2218 MAGNOLIA AVE RR Tracks City Limits (130' N/ Syracuse Ave) B AAC C&G 8 4 335 80 27,964 86 65 35 0 1/28/25 Mill, Overlay w/Fabric (1.5 in) 4/8/19 MAG 2220 MAGNOLIA AVE City Limits (150' S/ Syracuse) Katella Ave B AC C&G 8 4 605 80 38,617 95 0 100 0 1/28/25 ARHM Overlay (1.5 in) 12/31/22 ORA 2420 ORANGEWOOD AVE Western Ave East End C AC C&G 8 2 500 59 32,969 99 0 100 0 12/9/24 Complete Reconstruction - AC 12/31/22 ORA 2430 ORANGEWOOD AVE Santa Rosalia Ave West End C AC C&G 8 2 50 58 8,331 82 0 98 2 1/23/25 AC Overlay 3/8/13

Page 1 of 9 ends

City of Stanton, CA
Pavement Condition Index (PCI) Report - All Streets
Sorted by Rank, Name Order (A-Z)
BranchID Sec ID Name From To Rank Surface Type Shoulder Zone Lanes L W True Area PCI % Load % Climate % Other Insp. Date Work History Type Work History Date ORA 2440 ORANGEWOOD AVE Santa Rosalia Ave Beach Blvd C AC 8 4 1,636 60 95,338 77 0 96 4 1/23/25 AC Overlay 4/1/13 ORA 2450 ORANGEWOOD AVE Beach Blvd City Limit (E) C AC C&G 8 4 1,300 58 76,666 88 0 100 0 1/23/25 Mill, Overlay w/Fabric (1.5 in) 4/8/19 WESTR 3450 WESTERN AVE City Limit (100' N/ Palais Rd) Cerritos Ave C AC C&G 8 4 1,290 60 77,863 99 0 100 0 1/22/25 Surface Treatment - Slurry Seal 12/31/22 WESTR 3460 WESTERN AVE Cerritos Ave RR Tracks C AC C&G 8 4 1,268 60 78,730 48 43 44 13 1/28/25 New Construction - Initial 3/1/04 WESTR 3465 WESTERN AVE RR Tracks Katella Ave C AC C&G 8 4 1,255 60 76,699 44 52 36 12 1/28/25 New Construction - Initial 3/1/04 WESTR 3470 WESTERN AVE Katella Ave Carie Ln C AC C&G 8 4 1,080 60 65,855 100 0 0 0 2/27/25 Overlay - AC Structural 2/27/25 WESTR 3475 WESTERN AVE Carie Ln Orangewood Ave C AC C&G 8 3 1,508 60 89,800 100 0 0 0 2/27/25 Overlay - AC Structural 2/27/25 WESTR 3480 WESTERN AVE Orangewood Ave City Limit (150' S/ Seaboard Cir) C AC C&G 8 3 1,330 60 78,379 100 0 0 0 2/27/25 Overlay - AC Structural 2/27/25

12.0 3,421,539
Locals
ACA 10 ACACIA AVE Beach Blvd Court St E AC C&G 3 2 620 36 21,465 48 77 14 9 1/8/25 New Construction - Initial 7/1/25 ACA 15 ACACIA AVE Court St Fern St E AC C&G 3 2 625 36 21,649 58 50 22 28 1/8/25 New Construction - Initial 7/1/25 ALE 20 ALE LN Lessue Ave Cul-De-Sac E AC C&G 2 2 188 33 8,177 100 0 0 0 2/27/25 Overlay - AC Structural 2/27/25 ALE 30 ALE LN Ruthann Ave Cul-De-Sac E AC 1 2 127 70 7,034 100 0 0 0 2/27/25 Overlay - AC Structural 2/27/25 AMY 150 AMY AVE Santa Rosalia Ave Cul-De-Sac E AC C&G 3 2 210 34 9,573 87 32 68 0 1/13/25 Surface Treatment - Slurry Seal 1/31/20 ARR 160 ARROWHEAD ST Winterwood Ave City Limit E AC C&G 3 2 1,050 36 38,967 71 80 17 3 1/21/25 Surface Treatment - Slurry Seal 1/31/20 ASB 170 ASBURY AVE Syracuse Ave Cul-De-Sac E AC C&G 7 2 140 40 6,534 88 0 96 4 1/8/25 ARHM Overlay (1.5 in) 7/12/11 ASB 180 ASBURY AVE Idyllwild Dr Thunderbird Ln E AC C&G 7 2 790 34 25,941 54 59 41 0 1/21/25 New Construction - Initial 6/1/05 ASC 190 ASCOT WAY Radcliff Way Camden Way E AC C&G 1 2 240 25 4,630 99 0 100 0 1/20/25 Grind and Overlay (2") 1/1/18 ASH 200 ASHDALE ST Cerritos Ave Cul-De-Sac (S) E AC C&G 4 2 180 40 8,608 87 28 72 0 1/14/25 Surface Treatment - Slurry Seal 1/31/20 ASH 210 ASHDALE ST Chanticleer Rd Cul-De-Sac E AC C&G 5 2 150 40 6,847 77 42 58 0 1/22/25 ARHM Overlay (2.0 in) 3/23/10 ASH 220 ASHDALE ST Winston Rd Cul-De-Sac E AC C&G 5 2 140 40 6,620 84 0 100 0 12/12/24 Surface Treatment - Slurry Seal 1/31/20 ASH 230 ASHDALE ST Cerritos Ave Cul-De-Sac (N) E AC C&G 5 2 532 36 19,150 47 67 28 5 1/14/25 New Construction - Initial 7/1/60 ASP 240 ASPEN WAY Braeswood Way End E AC C&G 6 2 105 20 2,552 83 86 14 0 1/22/25 Thin AC Overlay (1.5 in) 8/1/13 AUB 250 AUBURN WAY Lambert Way Grant Way E AC C&G 1 2 380 30 7,955 79 45 55 0 1/27/25 Surface Treatment - Slurry Seal 1/1/21 AUG 260 AUGUSTA WAY Marhsall Way End E AC C&G 1 2 86 30 2,195 78 0 100 0 1/23/25 Surface Treatment - Slurry Seal 1/31/20 AUS 270 AUSTIN WAY Cabot Way End E AC C&G 1 2 125 20 2,722 81 0 100 0 1/20/25 Cold Mill/Overlay 4/30/13 AUT 280 AUTUMN LN Briarwood St Cul-De-Sac E AC C&G 3 2 180 40 7,819 63 74 26 0 12/9/24 Surface Treatment - Slurry Seal 1/1/21 BAN 290 BANFF ST Winston Rd Cul-De-Sac E AC C&G 5 2 139 40 6,640 83 0 100 0 12/12/24 ARHM Overlay (2.0 in) 3/23/10 BAN 300 BANFF ST Chanticleer Rd Cul-De-Sac E AC C&G 5 2 160 40 7,564 100 0 0 0 2/27/25 Overlay - AC Structural 2/27/25 BAT 310 BATES WY College Dr End E AC C&G 6 2 120 40 1,846 93 0 100 0 1/20/25 Cold Mill and Overlay - 2 Inches 6/1/15 BEE 320 BEECHWOOD WY Sandalwood Way End E AC C&G 6 2 530 20 10,823 84 6 57 37 1/22/25 Thin AC Overlay (1.5 in) 8/1/13 BEL 330 BELGRAVE AVE Santa Rosalia Ave City Limit E AAC C&G 3 2 310 34 10,827 99 0 100 0 1/13/25 Overlay - AC Structural 1/31/20 BELL 340 BELL ST Cerritos Ave Cul-De-Sac E AC C&G 7 2 1,200 37 45,327 78 46 51 3 1/9/25 Surface Treatment - Slurry Seal 6/30/20 BEN 350 BENTLY AVE Santa Rosalia Ave Fieldgate St E AC C&G 3 2 800 34 26,634 53 79 16 5 1/13/25 Slurry Seal 8/1/13 BEV 360 BEVER PL Beach Blvd End (Private Road) E AC 2 2 630 36 21,598 71 0 23 77 12/9/24 Thin AC Overlay (1.5 in) 8/1/13 BLU 380 BLUE SPRUCE WY Summertree Ln End E AC AB 6 2 170 20 3,861 88 0 32 68 1/22/25 Thin AC Overlay (1.5 in) 8/1/13 BOA 390 BOATMAN AVE Katella Ave Cul-De-Sac E AC C&G 4 2 470 40 21,131 87 0 65 35 12/12/24 New Construction - Initial 1/1/56 BOC 400 BOCK AVE Lowden St Western Ave E AC C&G 7 2 1,133 34 38,294 87 0 100 0 1/9/25 Surface Treatment - Slurry Seal 1/31/20 BRAP 410 BRADFORD PL Bradford St Katella Ave E AC 1 2 980 36 37,109 65 41 59 0 1/20/25 AC Overlay (2 in) 8/14/12 BRAS 420 BRADFORD ST Katella Ave Rutledge Ave E AC C&G 1 2 216 36 8,423 84 33 67 0 1/20/25 AC Overlay (2 in) 8/14/12 BRA 430 BRAESWOOD WY Summertree Ln Aspen Way E AC C&G 6 2 105 20 2,633 88 0 50 50 1/22/25 Thin AC Overlay (1.5 in) 8/1/13 BRA 440 BRAESWOOD WY Aspen Way Sandalwood Way E AC C&G 6 2 315 20 8,340 71 58 32 10 1/22/25 Thin AC Overlay (1.5 in) 8/1/13 BRAG 450 BRAGG WY Fulton Way Penn Way E AC C&G 1 2 185 30 5,130 51 72 28 0 1/27/25 AC Overlay (2 in) 8/14/12 BRI 460 BRIARWOOD ST Catherine Ave Winterwood Ave E AC C&G 3 2 550 36 19,130 51 75 12 13 1/21/25 ARHM Overlay (2.0 in) 4/1/11 BRI 462 BRIARWOOD ST Winterwood Ave Brittany Ln E AC C&G 3 2 890 36 31,788 47 78 10 12 12/9/24 ARHM Overlay (2.0 in) 4/1/11 BRI 464 BRIARWOOD ST Brittany Ln Chapman Ave E AC C&G 3 2 725 36 25,264 54 77 23 0 12/9/24 ARHM Overlay (2.0 in) 4/1/11 BRIT 470 BRITTANY LN Briarwood St Cul-De-Sac E AC C&G 3 2 370 38 13,923 84 16 84 0 12/9/24 ARHM Overlay (2.0 in) 4/1/11 BUR 480 BURTON WY South End (@ Kelton St) North End E AC C&G 1 2 250 30 6,123 64 54 37 9 1/28/25 New Construction - Initial 6/1/05 CAB 490 CABOT WY Lambert Way Austin Way E AC C&G 1 2 110 30 3,725 85 1 99 0 1/20/25 Cold Mill/Overlay 4/1/13 CAB 492 CABOT WY Lambert Way West End E AC C&G 1 2 85 30 1,846 81 0 80 20 1/23/25 Cold Mill/Overlay 4/1/13 CAM 500 CAMDEN WY Ascot Way Rutledge Ave E AC C&G 1 2 430 30 11,430 99 0 100 0 1/20/25 Grind and Overlay (2") 1/1/18 CAMU 510 CAMUS LN Lampson Ave Samura Pl E AC C&G 3 2 420 36 15,195 82 16 77 7 1/13/25 Thin AC Overlay (1.5 in) 8/3/13 CAP 520 CAPISTRANO DR Briarwood St Malibu Dr E AC C&G 3 2 615 20 12,143 100 0 0 0 2/27/25 Overlay - AC Structural 2/27/25 CARD 530 CARDIFF DR San Marcos Dr Westcliff Dr E AC C&G 3 2 380 20 7,093 100 0 0 0 2/27/25 Overlay - AC Structural 2/27/25 CARI 540 CARIE LN Western Ave Cul-De-Sac E AC C&G 1 2 352 34 13,717 100 0 0 0 2/27/25 Overlay - AC Structural 2/27/25 CAR 550 CARLA ST Georgian St Cul-De-Sac E AC C&G 3 2 385 34 14,927 69 82 18 0 1/13/25 Surface Treatment - Slurry Seal 1/31/20 CARL 560 CARLTON WY Penn Way Bradford Pl E AC C&G 1 2 105 30 1,908 64 40 46 14 1/23/25 AC Overlay (2 in) 8/14/12

Page 2 of 9 ends

City of Stanton, CA
Pavement Condition Index (PCI) Report - All Streets
Sorted by Rank, Name Order (A-Z)
BranchID Sec ID Name From To Rank Surface Type Shoulder Zone Lanes L W True Area PCI % Load % Climate % Other Insp. Date Work History Type Work History Date CARL 570 CARLTON WY Bradford Pl End E AC C&G 1 2 190 30 4,253 91 0 48 52 1/20/25 AC Overlay (2 in) 3/1/13 CARM 580 CARMEL DR Westcliff Dr San Marcos Dr E AC C&G 3 2 285 20 7,409 69 54 28 18 1/22/25 Overlay - AC 3/29/13 CARR 590 CARROTWOOD WY Beechwood Way Blue Spruce Way E AC C&G 6 2 155 20 3,629 98 0 100 0 1/22/25 Thin AC Overlay (1.5 in) 8/1/13 CAT 600 CATHERINE AVE Beach Blvd Briarwood St E AC C&G 3 2 650 36 23,075 69 71 11 18 1/21/25 Surface Treatment - Slurry Seal 1/31/20 CED 610 CEDAR ST North End Monroe Ave E AC C&G 6 2 272 34 9,031 87 60 33 7 1/9/25 Surface Treatment - Slurry Seal 1/31/20 CED 620 CEDAR ST Monroe Ave Central Ave E AC C&G 6 2 279 34 9,123 86 0 100 0 1/9/25 Surface Treatment - Slurry Seal 1/31/20 CED 630 CEDAR ST Central Ave Chester Ave E AAC C&G 6 2 283 34 10,436 93 0 100 0 1/9/25 Overlay - AC Structural 1/31/20 CED 640 CEDAR ST Chester Ave Katella Ave E AC C&G 6 2 255 34 8,889 80 44 56 0 1/9/25 Surface Treatment - Slurry Seal 1/31/20 CED 650 CEDAR ST Katella Ave South End E AAC C&G 1 2 590 40 24,750 73 73 27 0 1/14/25 Grind and Overlay (2") 2/1/19 CEN 660 CENTRAL AVE Date St Cedar St E AC C&G 6 2 636 36 22,530 85 0 100 0 1/9/25 Grind and Overlay (2") 2/1/19 CEN 665 CENTRAL AVE Cedar St Flower Ave E AC C&G 6 2 640 36 22,715 84 0 100 0 1/9/25 Grind and Overlay (2") 2/1/19 CEN 668 CENTRAL AVE Flower Ave Beach Blvd E AC C&G 6 2 285 36 10,439 83 31 69 0 1/9/25 Grind and Overlay (2") 2/1/19 CEN 670 CENTRAL AVE Beach Blvd Chestnut Ave E AC C&G 4 2 270 25 7,009 89 57 1 42 1/10/25 New Construction - Initial 1/1/56 CHA 740 CHANTICLEER RD Dale Ave MacDuff St E AC C&G 5 2 935 36 30,991 35 82 15 3 1/14/25 AC Overlay (2 in) 2/14/12 CHA 750 CHANTICLEER RD Fern Ave Dale Ave E AC C&G 5 2 1,265 36 41,155 45 74 26 0 1/22/25 AC Overlay (2 in) 2/14/12 CHE 780 CHESTER AVE Oak St Rose St E AC C&G 6 2 620 33 19,656 48 63 23 14 1/23/25 New Construction - Initial 1/1/56 CHE 782 CHESTER AVE Rose St Flower Ave E AC C&G 6 2 295 33 9,505 44 49 38 13 1/28/25 New Construction - Initial 1/1/56 CHE 785 CHESTER AVE Flower Ave Beach Blvd E AC C&G 6 2 280 33 9,165 53 48 37 15 1/28/25 New Construction - Initial 1/1/56 CHE 790 CHESTER AVE Beach Blvd Chestnut Ave E AC C&G 4 2 230 35 8,118 90 0 100 0 12/9/24 New Construction - Initial 1/1/56 CHE 795 CHESTER AVE Chestnut Ave Court Ave E AC C&G 4 2 295 36 10,453 89 23 77 0 12/9/24 New Construction - Initial 1/1/56 CHES 800 CHESTNUT AVE Central Ave Katella Ave E AC C&G 4 2 262 36 15,174 80 65 28 7 12/9/24 New Construction - Initial 1/1/56 CHES 810 CHESTNUT AVE Monroe Ave Cul-De-Sac E AC C&G 4 2 270 36 10,818 88 20 80 0 12/12/24 New Construction - Initial 1/1/56 CHES 820 CHESTNUT AVE Cerritos Ave Main St E AC C&G 4 2 600 36 24,006 48 90 10 0 1/14/25 New Construction - Initial 1/1/56 CHES 830 CHESTNUT AVE Main St Pacific St E AC C&G 4 2 550 36 23,545 67 86 14 0 1/14/25 New Construction - Initial 1/1/56 COD 840 CODY DR Western Ave Courtright Rd E AC C&G 6 2 765 32 24,281 50 89 11 0 1/9/25 Slurry Seal or Chip Seal 2/10/09 COD 845 CODY DR Courtright Rd Sentry Dr E AC C&G 6 2 720 32 23,345 60 77 23 0 1/22/25 Slurry Seal or Chip Seal 2/10/09 COL 850 COLLEGE DR Western Ave Emory Way E AC C&G 6 2 575 32 17,477 75 67 33 0 1/20/25 Surface Treatment - Slurry Seal 6/30/20 COL 860 COLLEGE DR Emory Way Trinity Way E AC C&G 6 2 250 32 8,438 87 0 100 0 1/20/25 Surface Treatment - Slurry Seal 6/30/20 COL 870 COLLEGE DR Trinity Way Landers Way E AC C&G 6 2 358 32 10,505 84 0 100 0 1/20/25 Surface Treatment - Slurry Seal 6/30/20 COL 880 COLLEGE DR Landers way Cerritos Ave E AC C&G 6 2 305 32 9,828 83 17 83 0 1/21/25 Surface Treatment - Slurry Seal 6/30/20 COU 890 COURSON DR Syracuse Ave Cul-De-Sac E AC C&G 7 2 122 40 5,877 85 0 65 35 1/8/25 ARHM Overlay (1.5 in) 7/12/11 COU 900 COURSON DR Idyllwild Dr Cul-De-Sac (N) E AC C&G 7 2 268 34 12,212 51 50 50 0 12/12/24 New Construction - Initial 6/1/05 COU 910 COURSON DR Grandoaks Dr Cerritos Ave E AC C&G 7 2 481 34 15,522 73 66 34 0 1/9/25 Surface Treatment - Slurry Seal 6/30/20 COU 920 COURSON DR Lowell Cul-De-Sac E AC C&G 7 2 116 34 5,842 52 39 61 0 12/12/24 New Construction - Initial 6/1/05 COU 930 COURSON DR Idyllwild Dr Cul-De-Sac (S) E AC C&G 7 2 256 34 8,021 46 54 46 0 12/12/24 New Construction - Initial 7/1/56 COU 940 COURSON DR Palais Cul-De-Sac E AC C&G 7 2 162 34 7,213 82 18 82 0 1/9/25 Surface Treatment - Slurry Seal 6/30/20 COUR 1000 COURT AVE Stanford Ave Acacia Ave E AC C&G 3 2 600 36 22,951 72 73 21 6 1/8/25 Surface Treatment - Slurry Seal 1/31/20 COUR 1010 COURT AVE Acacia Ave Garden Grove Blvd E AC C&G 3 2 630 36 22,249 53 61 34 5 1/8/25 New Construction - Initial 1/1/56 COUR 1020 COURT AVE Orangewood Ave Plaza Way E AC C&G 4 2 600 36 14,106 83 0 70 30 12/9/24 Cold Mill/Overlay 8/14/12 COUR 950 COURT AVE Monroe Ave Cul-De-Sac (N) E AC C&G 4 2 275 36 11,027 58 68 20 12 12/12/24 New Construction - Initial 1/1/56 COUR 960 COURT AVE Monroe Ave South End E AC C&G 4 2 340 36 12,112 67 52 48 0 12/12/24 New Construction - Initial 1/1/56 COUR 970 COURT AVE Cerritos Ave Main St E AC C&G 4 2 585 36 19,010 86 47 29 24 1/10/25 New Construction - Initial 1/1/56 COUR 980 COURT AVE Main St Pacific St E AC C&G 4 2 545 36 17,627 83 0 60 40 1/10/25 New Construction - Initial 1/1/56 COUR 990 COURT AVE Chester Ave Katella Ave E AC C&G 4 2 265 25 6,461 64 89 5 6 12/9/24 New Construction - Initial 1/1/56 COURLN 1025 COURT LN Orangewood Ave End E AC 2 2 135 36 4,641 67 0 100 0 1/21/25 New Construction - Initial 1/1/80 COURT 1030 COURTRIGHT RD Cody Dr South End E AAC C&G 6 2 247 34 8,632 100 0 0 0 1/9/25 Overlay - AC Structural 11/4/24 COURT 1040 COURTRIGHT RD Cody Dr City Limit (N) E AC C&G 6 2 500 34 16,393 52 81 19 0 1/9/25 Slurry Seal or Chip Seal 2/10/09 CRI 1050 CRIS AVE Magnolia Ave Vinevale St E AC C&G 4 2 545 36 19,443 82 39 61 0 1/13/25 Thin AC Overlay (1.5 in) 8/1/13 CUS 1060 CUSTER WAY Bradford Pl Grant Way E AC C&G 1 2 280 30 5,987 64 86 14 0 1/23/25 Surface Treatment - Slurry Seal 1/31/20 DAN 1110 DANA WAY College Dr End E AC C&G 6 2 120 20 1,815 85 0 100 0 1/22/25 Cold Mill and Overlay - 2 Inches 6/1/15 DAT 1120 DATE ST Katella Ave Summerwood Ln E AC C&G 6 2 1,000 34 31,917 79 28 72 0 1/9/25 Surface Treatment - Slurry Seal 1/31/20 DAV 1130 DAVMOR AVE Santa Rosalia Stanton Ave E AC C&G 1 2 1,520 33 50,338 86 0 100 0 12/9/24 Grind and Overlay (2") 2/1/19 DEL 1140 DEL REY DR Malibu Dr Westcliff Dr E AC C&G 3 2 310 20 6,525 68 64 32 4 1/22/25 AC Overlay (2 in) 11/13/12 DEV 1150 DEVONWOOD AVE Santa Rosalia Ave Fieldgate St E AAC C&G 3 2 805 34 27,523 100 0 0 0 1/13/25 Overlay - AC Structural 11/4/24 DOG 1160 DOGWOOD WAY Sandalwood Way End E AC C&G 6 2 105 30 2,473 78 18 82 0 1/22/25 Thin AC Overlay (1.5 in) 8/1/13 DOV 1170 DOVER WAY Rutledge Ave Windmere Way E AC C&G 1 2 220 30 5,865 99 0 100 0 1/20/25 Grind and Overlay (2") 1/1/18 DRA 1180 DRAKE WAY College Dr End E AC C&G 6 2 125 20 1,868 82 16 84 0 1/21/25 Cold Mill and Overlay - 2 Inches 6/1/15 DRE 1190 DREW WAY College Dr Vassar Way E AC C&G 6 2 280 20 4,829 74 84 16 0 1/22/25 Cold Mill and Overlay - 2 Inches 6/1/15

Page 3 of 9 ends

City of Stanton, CA
Pavement Condition Index (PCI) Report - All Streets
Sorted by Rank, Name Order (A-Z)
BranchID Sec ID Name From To Rank Surface Type Shoulder Zone Lanes L W True Area PCI % Load % Climate % Other Insp. Date Work History Type Work History Date DUK 1200 DUKE WAY College Dr End E AC C&G 6 2 120 20 1,637 82 0 100 0 1/22/25 Cold Mill and Overlay - 2 Inches 6/1/15 EAT 1210 EATON WAY Rutledge Ave End E AC C&G 1 2 160 30 3,877 92 0 35 65 1/20/25 Grind and Overlay (2") 1/1/18 EIL 1220 EILEEN ST Santa Rosalia Stanton Ave E AC C&G 1 2 1,520 33 50,514 80 0 94 6 12/9/24 Surface Treatment - Slurry Seal 1/31/20 ELD 1230 ELDER WAY Juniper Way End E AC C&G 6 2 95 20 2,264 88 0 57 43 1/22/25 Thin AC Overlay (1.5 in) 8/1/13 ELE 1240 ELECTRIC WAY Court Ave Cul-De-Sac E AC C&G 4 2 690 36 33,846 66 58 38 4 12/12/24 New Construction - Initial 7/1/59 EME 1250 EMERSON WAY Bradford Pl Fulton Way E AC C&G 1 2 175 30 5,217 44 44 36 20 1/23/25 AC Overlay (2 in) 8/14/12 EMO 1260 EMORY WAY College Dr End E AC C&G 6 2 120 20 2,279 80 0 89 11 1/21/25 Cold Mill and Overlay - 2 Inches 6/1/15 EVE 1270 EVERGREEN WAY Summertree Ln Royal Oak Way E AC C&G 6 2 120 20 2,631 94 0 100 0 1/22/25 Thin AC Overlay (1.5 in) 8/1/13 EWE 1280 EWELL WAY Rutledge Ave Hardee Way E AC C&G 1 2 230 30 6,866 76 0 6 94 1/23/25 Grind and Overlay (2") 1/1/18 FER 1290 FERN ST City Limit (N) Starr St E AC C&G 5 2 350 32 10,685 71 58 42 0 1/13/25 Cold Mill/Overlay 8/14/12 FER 1295 FERN ST Starr St Chanticleer Rd E AC C&G 5 2 865 35 27,815 64 59 41 0 1/27/25 Cold Mill/Overlay 8/14/12 FER 1300 FERN ST Chanticleer Rd Cerritos Ave E AC C&G 5 2 760 36 24,735 54 81 19 0 1/27/25 Cold Mill/Overlay 8/14/12 FER 1310 FERN ST Cerritos Ave Pacific St E AC C&G 4 2 1,110 36 40,875 100 0 0 0 2/27/25 Overlay - AC Structural 2/27/25 FER 1320 FERN ST Stanford Ave (SB Only) Acacia Ave (SB Only) E AC C&G 3 1 650 18 11,987 100 0 0 0 1/8/25 New Construction - Initial 4/30/13 FER 1325 FERN ST Acacia Ave (SB Only) Garden Grove Blvd (SB Only) E AC C&G 3 1 635 18 10,926 100 0 0 0 1/8/25 New Construction - Initial 4/30/13 FIE 1330 FIELDGATE ST Georgian St City Limit (Bently Ave) E AC C&G 3 2 460 34 14,616 76 77 23 0 1/13/25 Slurry Seal 8/1/13 FIL 1340 FILLMORE ST City Limit (W/ Arthur Dr) Cul-De-Sac E AC C&G 2 2 450 34 17,088 78 37 63 0 12/9/24 Surface Treatment - Slurry Seal 1/31/20 FIR 1350 FIRST ST Beach Blvd Cul-De-Sac E AC C&G 6 2 798 34 27,742 74 46 39 15 1/10/25 Slurry Seal or Chip Seal 2/10/09 FLO 1360 FLOWER ST Cerritos Ave Main St E AC C&G 6 2 590 36 18,941 78 70 30 0 1/10/25 Surface Treatment - Slurry Seal 1/1/21 FLO 1370 FLOWER ST Main St Pacific St E AC C&G 6 2 538 36 17,732 75 75 25 0 1/10/25 Surface Treatment - Slurry Seal 1/1/21 FLO 1380 FLOWER ST Monroe Ave Central Ave E AC C&G 6 2 276 34 10,365 100 0 0 0 2/27/25 Overlay - AC Structural 2/27/25 FLO 1390 FLOWER ST Central Ave Chester Ave E AC C&G 6 2 285 34 10,495 100 0 0 0 2/27/25 Overlay - AC Structural 2/27/25 FLO 1400 FLOWER ST Chester Ave Katella Ave E AC C&G 6 2 265 34 8,850 100 0 0 0 2/27/25 Overlay - AC Structural 2/27/25 FUL 1410 FULTON WY Rutledge Way Trojan Way E AAC C&G 1 2 240 26 5,912 100 0 0 0 1/20/25 Overlay - AC Structural 11/1/24 FUL 1412 FULTON WY Trojan Way Emerson Way E AAC C&G 1 2 330 26 6,678 100 0 0 0 1/20/25 Overlay - AC Structural 11/4/24 FUL 1414 FULTON WY Emerson Way Grant Way E AAC C&G 1 2 590 26 14,503 100 0 0 0 1/20/25 Overlay - AC Structural 11/4/24 FUL 1415 FULTON WY Grant Way Lambert Way E AAC C&G 1 2 430 28 11,272 100 0 0 0 1/20/25 Overlay - AC Structural 11/4/24 FUL 1416 FULTON WY Lambert Way End E AAC C&G 1 2 100 25 2,111 100 0 0 0 1/20/25 Overlay - AC Structural 11/4/24 GAR 1430 GARRET RD Syracuse Ave Mitchell Dr E AC C&G 6 2 360 36 12,875 82 18 82 0 1/8/25 Surface Treatment - Slurry Seal 1/31/20 GAR 1440 GARRET RD Cody Dr City Limit E AC C&G 6 2 505 34 16,875 46 87 13 0 1/9/25 Slurry Seal or Chip Seal 2/10/09 GEN 1450 GENTRY WAY Bradford Pl End E AC C&G 1 2 150 30 3,775 71 27 41 32 1/23/25 AC Overlay (2 in) 8/14/12 GEO 1460 GEORGIAN ST Santa Rosalia Ave Cul-De-Sac E AC C&G 3 2 1,565 34 55,701 77 77 23 0 1/13/25 Surface Treatment - Slurry Seal 1/31/20 GRA 1470 GRANDOAKS DR Lexington St Ramblewood Dr E AC C&G 7 2 1,515 34 52,460 83 18 82 0 1/9/25 Surface Treatment - Slurry Seal 6/30/20 GRAN 1480 GRANT WAY Marshall Way Custer Way E AC C&G 1 2 200 30 4,674 100 0 0 0 2/27/25 Overlay - AC Structural 2/27/25 GRAN 1490 GRANT WAY Custer Way Fulton Way E AC C&G 1 2 395 30 7,481 74 56 38 6 1/28/25 Surface Treatment - Slurry Seal 1/31/20 HAM 1500 HAMDEN AVE Middlesex Dr Cul-De-Sac E AC C&G 7 2 312 34 12,396 49 53 47 0 12/12/24 New Construction - Initial 6/1/05 HAM 1510 HAMDEN AVE Syracuse Ave Cul-De-Sac (N) E AC C&G 7 2 275 34 10,911 91 0 100 0 1/8/25 ARHM Overlay (1.5 in) 7/12/11 HAM 1520 HAMDEN AVE Syracuse Ave Cul-De-Sac (S) E AC C&G 7 2 78 40 4,716 92 0 100 0 1/8/25 New Construction - Initial 7/1/59 HAMP 1530 HAMPTON WY Fulton Way Lambert Way E AC C&G 1 2 990 30 20,547 60 72 20 8 1/23/25 Cold Mill/Overlay 4/1/13 HAR 1540 HARDEE WAY Ewell Way Kirby Way E AC C&G 1 2 260 20 5,802 99 0 100 0 1/20/25 Grind and Overlay (2") 1/1/18 HARR 1550 HARRIET ST Yana Dr Cul-De-Sac E AC C&G 5 2 430 34 16,835 50 71 29 0 1/13/25 AC Overlay (2 in) 2/14/12 HIC 1560 HICKOCK ST Cody Dr Cul-De-Sac E AC C&G 6 2 210 34 8,750 76 0 8 92 1/22/25 Surface Treatment - Slurry Seal 6/30/20 HOO 1570 HOOD WAY Kirby Way Rutledge Ave E AC C&G 1 2 205 30 6,120 99 0 100 0 1/20/25 Grind and Overlay (2") 1/1/18 HOV 1580 HOOVER ST City Limit (N/ Garden Grove Blvd) Cul-De-Sac E AC C&G 3 2 625 36 24,468 53 43 48 9 1/8/25 New Construction - Initial 1/1/56 HOP 1590 HOPI RD Santa Rosalia Ave Stanton Ave E AC C&G 2 2 1,520 32 50,655 59 53 45 2 1/20/25 New Construction - Initial 2/1/96 HUN 1600 HUNTER WAY College Dr West End E AC C&G 6 2 95 20 1,632 86 0 100 0 1/22/25 Cold Mill and Overlay - 2 Inches 6/1/15 HUN 1610 HUNTER WAY College Dr East End E AC C&G 6 2 95 20 1,428 77 0 100 0 1/22/25 Cold Mill and Overlay - 2 Inches 6/1/15 HYNE 1620 HYNES Beach Blvd Private Gate E AC C&G 2 2 186 32 6,752 77 6 94 0 12/9/24 ARHM Overlay (2.0 in) 4/18/11 IDY 1630 IDYLLWILD DR Asbury Ave Courson Dr E AC C&G 7 2 225 34 8,245 51 75 23 2 1/21/25 New Construction - Initial 6/1/05 IDY 1635 IDYLLWILD DR Courson Dr Ramblewood Dr E AC C&G 7 2 225 34 7,816 47 75 25 0 1/21/25 New Construction - Initial 6/1/05 IDY 1638 IDYLLWILD DR Ramblewood Dr Western Ave E AC C&G 7 2 220 34 7,523 53 59 41 0 1/21/25 New Construction - Initial 6/1/05 IDY 1640 IDYLLWILD DR Western Ave End E AC C&G 6 2 381 36 13,410 43 66 26 8 1/23/25 Slurry Seal or Chip Seal 12/19/06 IND 1650 INDUSTRIAL AVE Western Ave Mercantile Ave E AC C&G 1 2 475 36 19,647 78 34 66 0 1/20/25 Grind and Overlay (2") 2/1/19 ION 1660 IONA WY College Dr End E AC C&G 6 2 120 20 1,690 57 95 5 0 1/22/25 Surface Treatment - Slurry Seal 1/31/20 JAN 1670 JANE WAY Orangewood Ave Pickens St E AC C&G 4 2 995 34 32,410 79 0 89 11 12/9/24 ARHM Overlay (2.0 in) 4/1/11 JOE 1680 JOEL AVE Santa Rosalia Ave Stanton Ave E AC C&G 1 2 1,520 33 50,468 82 14 86 0 1/14/25 Surface Treatment - Slurry Seal 1/31/20 JUN 1690 JUNIPER WY Beechwood Way Elder Way E AC C&G 6 2 115 30 3,044 92 0 61 39 1/22/25 Thin AC Overlay (1.5 in) 8/1/13 KATELLA FR 1780 KATELLA FRONTAGE RD Katella Ave (W) Mac St E AC 4 3 760 28 22,088 82 19 68 13 1/28/25 Thin AC Overlay (1.5 in) 8/1/13

Page 4 of 9 ends

City of Stanton, CA
Pavement Condition Index (PCI) Report - All Streets
Sorted by Rank, Name Order (A-Z)
BranchID Sec ID Name From To Rank Surface Type Shoulder Zone Lanes L W True Area PCI % Load % Climate % Other Insp. Date Work History Type Work History Date KATELLA FR 1782 KATELLA FRONTAGE RD Mac St Katella Ave (E) E AC 4 3 500 28 14,011 84 0 100 0 1/28/25 Thin AC Overlay (1.5 in) 8/1/13 KEE 1790 KEENAN PL Kermore St Cul-De-Sac E AC C&G 7 2 350 40 14,749 86 0 100 0 1/8/25 ARHM Overlay (1.5 in) 7/12/11 KEL 1800 KELTON WAY Hampton Way Burton Way E AC C&G 1 2 125 30 3,522 62 63 26 11 1/28/25 Cold Mill/Overlay 4/1/13 KEN 1810 KENMORE ST Kennelly Ln Winston St E AC C&G 5 2 250 34 9,111 99 0 100 0 1/13/25 Complete Reconstruction - AC 1/31/20 KEN 1820 KENMORE ST Stardust Ln South End E AC C&G 4 2 180 30 5,206 65 15 85 0 1/14/25 New Construction - Initial 6/1/05 KENN 1830 KENNELLY LN Sherrill St Cul-De-Sac E AC C&G 5 2 1,095 34 37,725 99 0 100 0 1/13/25 Complete Reconstruction - AC 1/31/20 KENT 1840 KENT WY Dover Way End E AC C&G 1 2 80 30 1,984 99 0 100 0 1/20/25 Grind and Overlay (2") 1/1/18 KER 1850 KERMORE LN Knott Ave Via Jacara E AC C&G 7 2 116 37 4,262 89 38 62 0 1/8/25 Surface Treatment - Slurry Seal 4/1/22 KER 1860 KERMORE LN Knott Ave Keenan Pl E AC 7 2 1,160 45 47,437 90 0 63 37 1/8/25 Micro Surfacing 1/1/17 KER 1870 KERMORE LN Keenan Pl Lowden St E AC 7 2 220 33 7,274 90 0 100 0 1/8/25 New Construction - AC 1/1/30 KIR 1880 KIRBY WY Hardee Way Hood Way E AC C&G 1 2 450 25 9,596 96 0 35 65 1/20/25 Grind and Overlay (2") 1/1/18 LAG 1920 LAGUNA CT Westcliff Dr End E AC C&G 3 2 115 20 4,255 69 38 30 32 1/23/25 Slurry Seal 1/31/20 LAM 1930 LAMBERT WAY Auburn Way Fulton Way E AC C&G 1 2 215 30 6,402 79 56 38 6 1/27/25 Surface Treatment - Slurry Seal 1/31/20 LAM 1940 LAMBERT WAY Fulton Way Longford Way E AC C&G 1 2 110 18 1,631 30 89 11 0 1/27/25 New Construction - AC 8/14/12 LAM 1950 LAMBERT WAY Longford Way Hampton Way E AC C&G 1 2 400 30 8,943 100 0 0 0 2/27/25 Overlay - AC Structural 2/27/25 LAN 1980 LANDERS WAY College Dr End E AC C&G 6 2 125 20 2,740 71 42 58 0 1/22/25 Cold Mill and Overlay - 2 Inches 6/1/15 LAU 1990 LAURELTON AVE Santa Rosalia Ave City Limit (E) E AC C&G 3 2 310 34 10,690 81 49 51 0 1/13/25 Surface Treatment - Slurry Seal 1/31/20 LEA 2000 LEAFWOOD ST Briarwood St Winterwood Ave E AC C&G 3 2 805 34 28,466 49 87 13 0 12/9/24 ARHM Overlay (2.0 in) 3/23/10 LEE 2010 LEE WAY College Dr Scripps Way E AC C&G 6 2 285 20 4,267 64 74 21 5 1/22/25 Cold Mill and Overlay - 2 Inches 6/1/15 LEN 2020 LENMAR AVE Davmor Ave Orangewood Ave E AC C&G 1 2 266 33 8,910 64 56 40 4 1/20/25 AC Overlay (2 in) 11/13/12 LEN 2030 LENMAR AVE Orangewood Ave Lessue Ave E AC C&G 2 2 426 33 14,688 56 60 36 4 12/12/24 New Construction - Initial 1/1/97 LES 2040 LESSUE AVE Santa Rosalia Stanton Ave E AC C&G 2 2 1,520 33 50,134 58 76 24 0 1/20/25 New Construction - Initial 2/1/96 LEX 2050 LEXINGTON DR Granoaks Dr Cerritos Ave E AC C&G 7 2 520 34 17,198 80 65 33 2 1/9/25 Surface Treatment - Slurry Seal 6/30/20 LEX 2060 LEXINGTON DR Cerritos Ave South End E AC C&G 7 2 750 32 24,128 87 38 25 37 1/9/25 Surface Treatment - Slurry Seal 6/30/20 LIT 2070 LITCHFIELD AVE Lowell St Cul-De-Sac E AC C&G 7 2 291 34 11,607 57 61 39 0 12/12/24 New Construction - Initial 6/1/05 LOL 2080 LOLA AVE Vantage St Sonnet St E AC C&G 5 2 739 36 26,681 87 22 78 0 12/12/24 Surface Treatment - Slurry Seal 1/31/20 LOL 2090 LOLA AVE Dale Ave MacDuff St E AC C&G 5 2 865 36 29,338 76 58 42 0 1/10/25 Surface Treatment - Slurry Seal 1/31/20 LOL 2100 LOLA AVE MacDuff St Sherrill St E AC C&G 5 2 522 33 17,176 73 70 30 0 1/13/25 Surface Treatment - Slurry Seal 1/31/20 LOL 2105 LOLA AVE Sherrill St Magnolia Ave E AC C&G 5 2 1,145 33 38,179 82 17 83 0 1/13/25 Surface Treatment - Slurry Seal 1/31/20 LON 2110 LONGFORD WAY Knott Ave Lambert Way E AC C&G 1 2 120 30 4,360 100 0 0 0 2/27/25 Overlay - AC Structural 2/27/25 LON 2120 LONGFORD WAY Lambert Way End E AC C&G 1 2 340 25 10,331 100 0 0 0 2/27/25 Overlay - AC Structural 2/27/25 LOWDEN 2130 LOWDEN ST Cerritos Ave Thunderbird Ln E AC C&G 7 2 1,135 34 37,256 51 54 44 2 12/12/24 New Construction - Initial 6/1/05 LOWDEN 2140 LOWDEN ST Syracuse Ave Bock Ave E AC C&G 7 2 535 34 17,802 82 14 86 0 1/8/25 ARHM Overlay (1.5 in) 7/12/11 LOWELL 2150 LOWELL ST Asbury Ave Ramblewood Dr E AC C&G 7 2 480 36 16,759 60 46 54 0 1/21/25 New Construction - Initial 6/1/05 LOWELL 2160 LOWELL ST Lowden St Litchfield Ave E AC C&G 7 2 170 34 7,623 56 61 39 0 12/12/24 New Construction - Initial 6/1/05 LUL 2170 LULLABY LN Yana Dr Cul-De-Sac E AC C&G 5 2 455 34 16,793 42 77 23 0 1/14/25 AC Overlay (2 in) 2/14/12 LUL 2180 LULLABY LN Lexington Dr Cul-De-Sac E AC C&G 7 2 417 34 15,534 91 0 100 0 1/9/25 Surface Treatment - Slurry Seal 6/30/20 MACST 2185 MAC ST Katella Frontage City Limits E AC 4 2 110 32 3,088 24 58 21 21 1/28/25 New Construction - Initial 1/1/80 MAC 2190 MACDUFF ST Lola Ave North End E AC 5 2 131 33 4,788 82 0 100 0 1/14/25 Grind and Overlay (2") 2/1/19 MAC 2200 MACDUFF ST Lola Ave Chanticleer Rd E AC C&G 5 2 1,036 36 30,590 55 82 18 0 1/14/25 Surface Treatment - Slurry Seal 1/31/20 MAI 2230 MAIN ST Rose St Beach Blvd E AC C&G 6 2 600 50 31,249 46 80 17 3 1/10/25 New Construction - Initial 1/1/56 MAI 2235 MAIN ST Beach Blvd Chestnut Ave E AC C&G 4 2 250 52 12,400 47 88 11 1 1/10/25 New Construction - Initial 1/1/56 MAI 2240 MAIN ST Chestnut Ave Court Ave E AC C&G 4 2 330 52 16,526 77 72 28 0 1/10/25 New Construction - Initial 1/1/56 MAI 2242 MAIN ST Court Ave Sycamore Ave E AC C&G 4 2 330 52 16,568 85 22 78 0 1/10/25 New Construction - Initial 1/1/56 MAI 2245 MAIN ST Sycamore Ave Fern Ave E AC C&G 4 2 310 52 15,460 79 49 51 0 1/10/25 New Construction - Initial 1/1/56 MAL 2250 MALIBU DR Capistrano Dr Del Rey E AC C&G 3 2 85 20 5,415 62 54 21 25 1/23/25 AC Overlay (2 in) 11/13/12 MARIO 2260 MARIO AVE Ruthann Ave Cul-De-Sac E AC C&G 1 2 209 33 9,044 100 0 0 0 2/27/25 Overlay - AC Structural 2/27/25 MARISA 2270 MARISA ST Georgian St Cul-De-Sac E AC C&G 3 2 190 34 8,321 81 62 38 0 1/13/25 Surface Treatment - Slurry Seal 1/31/20 MARR 2280 MARRYAT WAY Bradford Pl End E AC C&G 1 2 70 30 1,927 92 0 0 100 1/20/25 Cold Mill and Overlay 1/31/20 MARS 2290 MARSHALL WY Grant Way Bradford Pl E AC C&G 1 2 329 30 7,578 80 9 91 0 1/23/25 Surface Treatment - Slurry Seal 1/31/20 MAS 2300 MASTERSON ST Cody Dr City Limit E AC C&G 6 2 500 34 16,779 71 57 43 0 1/9/25 Slurry Seal or Chip Seal 2/10/09 MER 2310 MERCANTILE AVE Industrial Ave Katella Ave E AC C&G 1 2 475 37 16,596 84 49 51 0 1/9/25 Grind and Overlay (2") 2/1/19 MID 2320 MIDDLESEX ST Lowden St Ashbury Ave E AC C&G 7 2 491 34 16,514 54 65 35 0 1/21/25 New Construction - Initial 6/1/05 MIL 2330 MILLS WAY College Dr End E AC C&G 6 2 120 20 1,895 81 23 77 0 1/22/25 Cold Mill and Overlay - 2 Inches 6/1/15 MIT 2340 MITCHELL DR Garret Rd Syracuse Ave E AAC C&G 6 2 620 36 25,086 91 0 100 0 1/9/25 Overlay - AC Structural 1/31/20 MON 2350 MONROE AVE Beach Blvd Court Ave E AC C&G 4 2 600 40 22,607 60 43 56 1 12/12/24 New Construction - Initial 7/1/59 MON 2355 MONROE AVE Court Ave Stanton Storm Channel E AC C&G 4 2 1,075 40 42,405 62 55 45 0 12/12/24 New Construction - Initial 7/1/59 MON 2358 MONROE AVE Stanton Storm Channel Dale Ave E AC C&G 4 2 880 40 35,251 45 64 36 0 12/12/24 New Construction - Initial 7/1/59

Page 5 of 9 ends

City of Stanton, CA
Pavement Condition Index (PCI) Report - All Streets
Sorted by Rank, Name Order (A-Z)
BranchID Sec ID Name From To Rank Surface Type Shoulder Zone Lanes L W True Area PCI % Load % Climate % Other Insp. Date Work History Type Work History Date MON 2360 MONROE AVE Oak St Rose St E AC 6 2 626 33 20,728 100 0 0 0 2/27/25 Overlay - AC Structural 2/27/25 MON 2365 MONROE AVE Rose St Flower Ave E AC 6 2 305 33 9,804 100 0 0 0 2/27/25 Overlay - AC Structural 2/27/25 NAP 2370 NAPA WY College Dr End E AC C&G 6 2 120 20 1,734 61 78 22 0 1/22/25 Surface Treatment - Slurry Seal 1/31/20 NEWTON 2380 NEWTON WY Carlton Way Bradford Pl E AC C&G 1 2 340 30 7,945 94 0 56 44 1/20/25 AC Overlay (2 in) 3/1/13 OAK 2390 OAK ST Katella Ave Central Ave E AC C&G 6 2 580 34 21,728 55 55 32 13 1/21/25 New Construction - Initial 7/1/55 OAK 2400 OAK ST Central Ave Cul-De-Sac E AC C&G 6 2 585 34 21,412 85 25 75 0 1/9/25 Surface Treatment - Slurry Seal 1/31/20 OAKHAVEN 2410 OAKHAVEN ST Grandoaks Dr Cerritos Ave E AC C&G 7 2 478 34 16,114 75 66 34 0 1/9/25 Surface Treatment - Slurry Seal 6/30/20 ORR 2460 ORRWAY DR Lampson Ave Samura Pl E AC C&G 3 2 420 36 15,075 87 0 100 0 1/13/25 Thin AC Overlay (1.5 in) 8/1/13 OWE 2470 OWEN WAY College Dr End E AC C&G 6 2 85 20 1,299 95 0 100 0 1/21/25 Cold Mill and Overlay - 2 Inches 6/1/15 PACAVE 2475 PACIFIC AVE Magnolia Ave East City Limits E AC 4 0 100 33 2,658 86 34 66 0 1/28/25 New Construction - Initial 1/1/80 PACAVE 2500 PACIFIC AVE Sherill St Magnolia Ave E AC C&G 4 2 1,190 32 31,292 66 59 37 4 1/14/25 Slurry Seal or Chip Seal 12/18/06 PAC 2480 PACIFIC ST Rose St Beach Blvd E AC C&G 6 2 680 36 21,703 83 50 50 0 3/2/23 Surface Treatment - Slurry Seal 1/31/20 PAC 2490 PACIFIC ST Beach Blvd Fern Ave E AC C&G 4 2 1,270 32 46,298 81 0 64 36 12/9/24 New Construction - Initial 1/1/56 PAL 2510 PALAIS RD Western Ave Cul-De-Sac E AC C&G 7 2 880 34 31,100 81 45 55 0 1/9/25 Surface Treatment - Slurry Seal 6/30/20 PAL 2520 PALAIS RD Fern Ave Sonnet St E AC C&G 5 2 1,005 36 34,063 83 28 72 0 1/10/25 Surface Treatment - Slurry Seal 1/31/20 PAR 2530 PARK PLAZA Beach Blvd Cul-De-Sac E AC C&G 3 2 285 40 12,376 48 74 6 20 1/13/25 Thin AC Overlay (1.5 in) 8/1/13 PEN 2540 PENN WY Bragg Way Carlton Way E AC C&G 1 2 260 30 8,199 50 90 10 0 1/27/25 AC Overlay (2 in) 8/14/12 PEP 2550 PEPPERTREE LN Beechwood Way Cerritos Ave E AC C&G 6 2 100 40 4,446 91 0 87 13 1/22/25 Thin AC Overlay (1.5 in) 8/1/13 PIC 2560 PICKENS LN Jane Way Pine Tree Ln E AC C&G 4 2 225 34 9,148 76 0 53 47 12/9/24 ARHM Overlay (2.0 in) 4/1/11 PIN 2570 PINE TREE LN Orangewood Ave End E AC C&G 4 2 1,095 34 36,546 73 0 62 38 12/9/24 ARHM Overlay (2.0 in) 4/1/11 PUR 2580 PURDUE WAY College Dr End E AC C&G 6 2 95 20 1,434 96 0 100 0 1/22/25 Mill, Overlay w/Fabric (1.5 in) 3/1/19 QUE 2590 QUEENS WAY College Dr End E AC C&G 6 2 133 20 1,981 82 15 85 0 1/22/25 Cold Mill and Overlay - 2 Inches 6/1/15 RAD 2600 RADCLIFF WAY Rutledge Ave Ascot Way E AC C&G 1 2 245 30 6,553 99 0 100 0 1/20/25 Grind and Overlay (2") 1/1/18 RAM 2610 RAMBLEWOOD DR Palais Rd Cul-De-Sac E AC C&G 7 2 353 34 14,024 78 48 52 0 1/9/25 Surface Treatment - Slurry Seal 6/30/20 RAM 2620 RAMBLEWOOD DR Grandoaks Dr Cul-De-Sac E AC C&G 7 2 406 34 14,811 81 22 78 0 1/9/25 Surface Treatment - Slurry Seal 2/27/25 RAM 2630 RAMBLEWOOD DR Cerritos Ave Idyllwild Dr E AC C&G 7 2 315 36 11,060 40 75 25 0 1/21/25 New Construction - Initial 7/1/56 RAM 2640 RAMBLEWOOD DR Idyllwild Dr Cul-De-Sac E AC C&G 7 2 156 34 8,093 41 52 39 9 1/21/25 New Construction - Initial 6/1/05 RAM 2650 RAMBLEWOOD DR Lowell St Thunderbird Ln E AC C&G 7 2 362 34 12,345 54 57 43 0 1/21/25 New Construction - Initial 6/1/05 RAM 2660 RAMBLEWOOD DR Syracuse Ave Cul-De-Sac E AC C&G 7 2 119 40 5,812 83 14 86 0 1/8/25 ARHM Overlay (1.5 in) 7/12/11 ROS 2670 ROSE ST Cerritos Ave Pacific St E AAC C&G 6 2 965 36 34,513 46 58 18 24 1/23/25 Overlay - AC Thin 5/9/07 ROS 2680 ROSE ST Katella Ave Chester Ave E AC C&G 6 2 260 34 9,025 82 30 70 0 1/28/25 Surface Treatment - Slurry Seal 1/31/20 ROS 2690 ROSE ST Chester Ave Central Ave E AC C&G 6 2 280 34 10,588 81 56 44 0 1/9/25 Surface Treatment - Slurry Seal 1/31/20 ROS 2700 ROSE ST Central Ave Monroe Ave E AC C&G 6 2 290 34 10,667 79 24 76 0 1/9/25 Surface Treatment - Slurry Seal 1/31/20 ROS 2710 ROSE ST Monroe Ave North End E AC C&G 6 2 230 34 7,827 83 27 73 0 1/9/25 Surface Treatment - Slurry Seal 1/31/20 ROX 2720 ROXBURY WAY Rutledge Ave End E AC C&G 1 2 170 30 4,139 99 0 100 0 1/20/25 Grind and Overlay (2") 1/1/18 ROY 2730 ROYAL OAK WAY Evergreen Way Summertree Ln E AC C&G 6 2 235 20 7,062 84 8 14 78 1/22/25 Thin AC Overlay (1.5 in) 8/13/13 RUT 2740 RUTGERS WAY College Dr End E AC C&G 6 2 120 20 1,975 82 0 100 0 1/22/25 Cold Mill and Overlay - 2 Inches 6/1/15 RUTH 2750 RUTHANN AVE Santa Rosalia Ave Stanton Ave E AC C&G 1 2 1,520 33 51,752 81 1 96 3 1/20/25 Surface Treatment - Slurry Seal 1/31/20 RUTL 2760 RUTLEDGE AVE Western Ave Dover Pl E AC C&G 1 2 760 36 27,559 94 0 100 0 1/20/25 Grind and Overlay (2") 1/1/18 RUTL 2762 RUTLEDGE AVE Dover Pl Fulton Way E AC C&G 1 2 650 36 22,846 93 0 100 0 1/20/25 Grind and Overlay (2") 1/1/18 RUTL 2765 RUTLEDGE AVE Fulton Way Bradford Pl E AC C&G 1 2 560 32 19,889 93 17 83 0 1/20/25 Grind and Overlay (2") 1/1/18 SAM 2770 SAMURA PL Camus Ln Orrway Dr E AC C&G 3 2 250 36 12,804 86 0 100 0 1/13/25 Thin AC Overlay (1.5 in) 8/1/13 SAN 2780 SAN MARCOS DR Lampson Ave Cardiff Dr E AC C&G 3 2 790 32 21,355 58 57 41 2 1/23/25 Surface Treatment - Slurry Seal 2/27/25 SAND 2790 SANDALWOOD WAY Beechwood Way Rose St E AC C&G 6 2 1,195 24 22,436 77 35 32 33 1/22/25 Thin AC Overlay (1.5 in) 8/1/13 SNTB 2800 SANTA BARBARA AVE Santa Cruz Ave Santa Paula Ave E AC C&G 2 2 820 34 29,435 34 84 14 2 12/9/24 New Construction 2/14/11 SNTC 2810 SANTA CATALINA AVE Santa Rosalia Ave Santa Paula Ave E AC C&G 2 2 1,400 34 50,000 65 53 43 4 12/9/24 New Construction - Initial 2/1/96 SNTCR 2820 SANTA CRUZ ST Santa Gertrudes Ave Santa Catalina Ave E AC C&G 2 2 1,040 34 36,320 69 50 50 0 12/9/24 Surface Treatment - Slurry Seal 1/31/20 SNTCR 2830 SANTA CRUZ ST Lessue Ave Cul-De-Sac E AC C&G 2 2 188 34 8,081 100 0 0 0 2/27/25 Overlay - AC Structural 2/27/25 SNTG 2840 SANTA GERTRUDES AVE Santa Rosalia Ave Santa Paula Ave E AC C&G 2 2 1,220 32 40,593 83 0 100 0 12/9/24 Thin AC Overlay (1.5 in) 8/1/13 SNTM 2850 SANTA MARIA ST Santa Gertrudes Ave Santa Catalina Ave E AC C&G 2 2 1,040 34 36,052 83 16 84 0 12/9/24 Surface Treatment - Slurry Seal 1/31/20 SNTM 2860 SANTA MARIA ST Ruthann Ave Cul-De-Sac E AC C&G 1 2 308 33 12,234 100 0 0 0 2/27/25 Overlay - AC Structural 2/27/25 SNTM 2870 SANTA MARIA ST Lessue Ave Cul-De-Sac E AC C&G 2 2 188 34 8,187 100 0 0 0 2/27/25 Overlay - AC Structural 2/27/25 SNTMO 2880 SANTA MONICA AVE Santa Cruz Ave Santa Paula Ave E AC C&G 2 2 820 34 29,074 60 71 25 4 1/20/25 New Construction - Initial 7/1/53 SNTP 2890 SANTA PAULA AVE Chapman Ave Santa Rita Ave E AC C&G 2 2 370 33 12,776 79 54 46 0 1/20/25 Surface Treatment - Slurry Seal 1/31/20 SNTP 2900 SANTA PAULA AVE Santa Rita Ave Stanton Ave E AC C&G 2 2 830 34 28,791 70 51 49 0 1/23/25 New Construction - Initial 2/1/96 SNTR 2910 SANTA RITA AVE Santa Cruz Ave Santa Paula Ave E AC C&G 2 2 820 34 28,879 70 61 39 0 1/20/25 Surface Treatment - Slurry Seal 1/31/20 SNTRO 2920 SANTA ROSALIA AVE Lampson Ave Bently Ave E AC C&G 3 2 1,270 34 42,174 47 74 10 16 1/13/25 Slurry Seal 8/1/13 SNTRO 2925 SANTA ROSALIA AVE Bently Ave City Limits (Vanguard Cir) E AC C&G 3 2 1,030 34 34,724 50 77 23 0 1/13/25 Slurry Seal 8/1/13

Page 6 of 9 ends

City of Stanton, CA
Pavement Condition Index (PCI) Report - All Streets
Sorted by Rank, Name Order (A-Z)
BranchID Sec ID Name From To Rank Surface Type Shoulder Zone Lanes L W True Area PCI % Load % Climate % Other Insp. Date Work History Type Work History Date SNTRO 2930 SANTA ROSALIA AVE Chapman Ave Santa Catalina Ave E AC 2 2 1,245 34 42,180 78 26 70 4 12/9/24 ARHM Overlay (2.0 in) 2/12/13 SNTRO 2935 SANTA ROSALIA AVE Santa Catalina Ave Orangewood Ave E AC 2 2 1,333 34 46,899 86 18 80 2 12/9/24 ARHM Overlay (2.0 in) 2/12/13 SNTRO 2940 SANTA ROSALIA AVE Orangewood Ave Joel Ave E AC C&G 1 2 882 37 32,232 84 0 97 3 12/9/24 Grind and Overlay (2") 2/1/19 SNTRO 2945 SANTA ROSALIA AVE Joel Ave North End E AC C&G 1 2 845 37 30,788 86 0 96 4 12/9/24 Grind and Overlay (2") 2/1/19 SCR 2950 SCRIPPS WAY College Dr Yale Way E AC C&G 6 2 120 20 1,892 85 0 73 27 1/21/25 Cold Mill and Overlay - 2 Inches 6/1/15 SEC 2960 SECOND ST Sentry St Beach Blvd E AAC C&G 6 2 1,100 34 35,471 84 62 38 0 1/10/25 Overlay - AC Structural 1/31/20 SEN 2970 SENTRY ST Cody Dr Cul-De-Sac E AC C&G 6 2 423 34 15,785 61 60 27 13 1/22/25 Slurry Seal or Chip Seal 2/10/09 SHA 2980 SHADOW LN Briarwood St Cul-De-Sac E AC C&G 3 2 155 40 7,447 77 51 49 0 1/21/25 ARHM Overlay (2.0 in) 4/1/11 SHE 2990 SHERMAN WAY Newton Way South End E AC C&G 1 2 105 30 2,252 94 0 100 0 1/20/25 New Construction - Initial 6/1/05 SHE 3000 SHERMAN WAY Newton Way North End E AC C&G 1 2 90 30 1,965 84 0 33 67 1/20/25 AC Overlay (2 in) 3/1/13 SHER 3010 SHERRILL ST Lola Ave North End E AC 5 2 112 33 3,287 84 0 100 0 1/13/25 Grind and Overlay (2") 2/1/19 SHER 3020 SHERRILL ST Lola Ave Winston St E AC 5 2 497 34 17,188 99 0 100 0 1/13/25 Complete Reconstruction - AC 1/31/21 SHER 3030 SHERRILL ST Cerritos Ave Tina Way E AC C&G 4 2 635 32 20,668 53 47 46 7 1/14/25 New Construction - Initial 6/1/05 SHER 3035 SHERRILL ST Tina Way Pacific Ave E AC C&G 4 2 350 32 9,303 68 42 55 3 1/14/25 New Construction - Initial 6/1/05 SON 3040 SONNET ST Lola Ave Winston Rd E AC C&G 5 2 392 36 12,796 78 28 72 0 12/12/24 ARHM Overlay (2.0 in) 3/23/10 SON 3050 SONNET ST Chanticleer Rd Palais Rd E AC C&G 5 2 390 36 13,154 41 63 35 2 1/22/25 AC Overlay (2 in) 2/14/12 STA 3060 STANDUSTRIAL ST Dale Ave West End E AC C&G 4 2 945 36 34,843 73 77 23 0 12/12/24 Surface Treatment - Slurry Seal 1/31/20 STAN 3070 STANFORD AVE Beach Blvd Court St E AC C&G 3 2 640 32 20,554 66 48 28 24 1/21/25 New Construction - Initial 1/1/56 STAN 3075 STANFORD AVE Court St Fern St E AC C&G 3 2 670 32 21,358 46 61 27 12 1/21/25 New Construction - Initial 1/1/56 STANT 3080 STANTON AVE Santa Catalina Ave Cul-De-Sac E AC C&G 2 2 1,220 28 38,140 55 64 23 13 1/20/25 New Construction - Initial 1/1/97 STANT 3090 STANTON AVE Ruthann Ave Davmor Ave E AC C&G 1 2 798 29 22,244 87 0 100 0 12/9/24 Grind and Overlay (2") 2/1/19 STAR 3100 STARDUST LN Sherrill St Magnolia Ave E AC C&G 4 2 1,120 30 35,522 62 0 96 4 1/14/25 New Construction - Initial 6/1/05 STARR 3110 STARR ST Beach Blvd Lotus Ct E AC C&G 5 2 645 36 22,170 54 58 42 0 12/12/24 AC Overlay (2 in) 2/14/12 STARR 3115 STARR ST Lotus Ct Fern Ave E AC C&G 5 2 590 36 22,516 42 79 16 5 12/12/24 AC Overlay (2 in) 2/14/12 STARR 3120 STARR ST Fern Ave Vantage St E AC C&G 5 2 210 38 7,531 69 76 24 0 12/12/24 ARHM Overlay (2.0 in) 3/23/10 SUM 3130 SUMMERTREE LN Cerritos Ave Braeswood Way E AC C&G 6 2 455 34 13,452 95 0 100 0 1/22/25 Thin AC Overlay (1.5 in) 8/1/13 SYC 3140 SYCAMORE AVE Cerritos Ave Main St E AC C&G 4 2 590 36 21,302 93 0 88 12 1/10/25 New Construction - Initial 1/1/56 SYC 3150 SYCAMORE AVE Main St Pacific St E AC C&G 4 2 465 36 21,138 89 0 100 0 1/10/25 New Construction - Initial 1/1/56 SYC 3160 SYCAMORE AVE Stanford Ave Acacia Ave E AC C&G 3 2 600 36 20,701 47 68 13 19 1/8/25 New Construction - Initial 7/1/25 SYC 3170 SYCAMORE AVE Acacia Ave Garden Grove Blvd E AC C&G 3 2 630 36 22,123 61 57 17 26 1/8/25 New Construction - Initial 7/1/32 SYL 3180 SYLVAN ST Stardust Lane End E AC C&G 4 2 180 30 5,291 76 32 68 0 1/14/25 Surface Treatment - Slurry Seal 1/31/20 SYL 3190 SYLVAN ST Cerritos Ave End E AC C&G 4 2 285 30 9,257 100 0 0 0 2/27/25 Overlay - AC Structural 2/27/25 SYR 3200 SYRACUSE AVE Knott Ave Via Jacara E AC C&G 7 2 160 37 5,024 91 0 100 0 1/8/25 Surface Treatment - Slurry Seal 4/1/22 SYR 3210 SYRACUSE AVE Knott Ave Lowden St E AC C&G 7 2 1,465 32 46,390 82 50 50 0 1/8/25 Surface Treatment - Slurry Seal 1/31/20 SYR 3215 SYRACUSE AVE Lowden St Western Ave E AC C&G 7 2 1,205 32 39,151 84 18 82 0 1/8/25 Surface Treatment - Slurry Seal 1/31/20 SYR 3220 SYRACUSE AVE Western Ave Mitchell Dr E AC C&G 6 2 619 36 22,491 80 29 71 0 1/9/25 Surface Treatment - Slurry Seal 1/31/20 TAM 3230 TAMARACK WAY Sandalwood Way End E AC C&G 6 2 150 30 3,938 84 9 69 22 1/22/25 Thin AC Overlay (1.5 in) 8/1/13 TEM 3240 TEMPLE WAY College Dr End E AC C&G 6 2 95 20 1,424 84 0 100 0 1/22/25 Cold Mill and Overlay - 2 Inches 6/1/15 THU 3250 THUNDERBIRD LN Lowden St Western Ave E AC C&G 7 2 1,215 34 41,223 94 0 100 0 12/12/24 Reconstruct Structure (AC) 6/1/17 TIN 3260 TINA WY Sherrill St Magnolia Ave E AC C&G 4 2 1,110 30 29,269 66 64 36 0 1/14/25 Surface Treatment - Slurry Seal 1/31/20 TRI 3270 TRINITY WY College Dr End E AC C&G 6 2 120 20 2,009 82 30 70 0 1/21/25 Cold Mill and Overlay - 2 Inches 6/1/15 TRO 3280 TROJAN WAY Fulton Way End E AC C&G 1 2 135 30 3,059 46 71 11 18 1/23/25 AC Overlay (2 in) 8/14/12 TUL 3290 TULANE WAY College Dr End E AC C&G 6 2 120 20 1,797 88 24 70 6 1/21/25 Cold Mill and Overlay - 2 Inches 6/1/15 VAN 3300 VANTAGE ST Chanticleer Rd Cul-De-Sac E AC C&G 5 2 150 40 6,874 64 68 32 0 1/22/25 ARHM Overlay (2.0 in) 3/23/10 VAN 3310 VANTAGE ST Lola Ave Winston Rd E AC C&G 5 2 350 36 13,633 72 59 41 0 12/12/24 ARHM Overlay (2.0 in) 3/23/10 VAS 3320 VASSAR WY College Dr South End E AC C&G 6 2 255 20 4,027 56 83 14 3 1/22/25 Cold Mill and Overlay - 2 Inches 6/1/15 VER 3330 VERONA ST Stardust Lane End E AC C&G 4 2 180 30 5,232 63 7 89 4 1/14/25 New Construction - Initial 6/1/05 VIAI 3340 VIA IRANA Via Jacara Cul-De-Sac E AC C&G 7 2 1,807 37 68,397 84 55 41 4 1/10/25 Surface Treatment - Slurry Seal 4/1/22 VIA 3350 VIA JACARA Syracuse Ave Via Irana E AC C&G 7 2 535 37 20,144 86 57 43 0 1/8/25 Surface Treatment - Slurry Seal 4/1/22 VIAJ 3360 VIA JARDIN Via Kannela Cul-De-Sac E AC C&G 7 2 186 34 8,208 86 30 70 0 1/10/25 Surface Treatment - Slurry Seal 4/1/22 VIAK 3370 VIA KANNELA Via Jacara Cul-De-Sac E AC C&G 7 2 837 34 30,799 89 0 83 17 1/10/25 Surface Treatment - Slurry Seal 4/1/22 VIL SB 3380 VILLAGE CENTER DR SB Beach Blvd City Limit E AC C&G 3 2 1,320 23 35,720 87 13 72 15 1/21/25 Cold Mill/Overlay 4/30/13 VIL NB 3390 VILLAGE CENTR DR NB City Limit Beach Blvd E AC C&G 3 2 1,320 23 38,742 84 0 33 67 1/21/25 Cold Mill and Overlay 4/30/13 VIN 3400 VINEVALE ST Cris Ave Pacific Way E AC C&G 4 2 370 30 15,272 85 19 81 0 1/13/25 Surface Treatment - Slurry Seal 1/31/20 WAB 3410 WABASH WAY Landers Way End E AC C&G 6 2 95 20 1,497 84 0 100 0 1/22/25 Cold Mill and Overlay - 2 Inches 6/1/15 WAS 3420 WASCO RD Lola Ave Chanticleer Rd E AC C&G 5 2 870 34 28,911 65 80 20 0 1/10/25 Surface Treatment - Slurry Seal 1/31/20 WES 3430 WESTCHESTER ST Grandoaks Dr Cul-De-Sac E AC C&G 7 2 450 34 16,996 81 0 100 0 1/9/25 Surface Treatment - Slurry Seal 6/30/20 WEST 3440 WESTCLIFF DR Del Rey Dr Carmel Dr E AC C&G 3 2 835 20 17,613 60 50 43 7 1/23/25 AC Overlay (2 in) 11/13/12

Page 7 of 9 ends

City of Stanton, CA
Pavement Condition Index (PCI) Report - All Streets
Sorted by Rank, Name Order (A-Z)
BranchID Sec ID Name From To Rank Surface Type Shoulder Zone Lanes L W True Area PCI % Load % Climate % Other Insp. Date Work History Type Work History Date WIND 3490 WINDMERE WY Dover Way Rutledge Ave E AC C&G 1 2 650 30 13,216 99 0 100 0 1/20/25 Grind and Overlay (2") 1/1/18 WIN 3500 WINSTON RD Dale Ave Vantage St E AC C&G 5 2 1,025 36 34,187 76 43 56 1 12/12/24 ARHM Overlay (2.0 in) 3/23/10 WINST 3510 WINSTON ST Sherrill St Cul-De-Sac E AC 5 1 607 17 10,860 82 0 100 0 1/13/25 New Construction - AC 1/1/30 WINST 3520 WINSTON ST Kenmore St Magnolia Ave E AC 5 1 260 17 3,995 82 52 48 0 1/13/25 New Construction - AC 1/1/30 WINT 3530 WINTERWOOD AVE Briarwood St Leafwood St E AC C&G 3 2 1,000 34 38,046 61 73 27 0 12/9/24 Surface Treatment - Slurry Seal 1/31/20 WYA 3540 WYATT RD Cody Dr Cul-De-Sac E AC C&G 6 2 445 34 18,001 69 52 35 13 1/22/25 Slurry Seal or Chip Seal 2/10/09 YAL 3550 YALE WAY Lee Way East End E AC C&G 6 2 185 20 3,891 81 48 52 0 1/21/25 Cold Mill and Overlay - 2 Inches 6/1/15 YAN 3560 YANA DR Lola Ave Chanticleer Rd E AC C&G 5 2 953 36 31,720 84 2 73 25 1/13/25 ARHM Overlay (2.0 in) 9/22/09 YAN 3570 YANA DR Chanticleer Rd Cerritos Ave E AC C&G 5 2 810 36 27,021 70 56 44 0 1/14/25 ARHM Overlay (2.0 in) 9/22/09 YOR 3580 YORKSHIRE AVE Santa Rosalia Ave Stanton Ave E AC C&G 2 2 1,520 34 51,057 60 49 40 11 1/20/25 New Construction - Initial 1/1/97

32.7 5,754,386
Alleys
ALYFB 85 Alley b/w Flower and Beach Main St End AC O AC 6 1 315 20 6,300 8 52 30 18 4/7/23 New Construction - Initial 1/1/56 ALYFB 80 Alley b/w Flower and Beach Cerritos Ave Main St O AC 6 1 580 20 11,600 18 63 32 5 4/7/23 New Construction - Initial 1/1/56 ALCLU 3696 Alley b/w Lullaby and Cerritos Yana Dr East End O AC 5 1 550 20 11,000 22 54 37 9 4/14/23 New Construction - Initial 1/1/80 ALORLE 3622 Alley b/w Orangewood and Lessue Lenmar St East End O AC 2 1 245 20 4,900 22 47 53 0 4/14/23 New Construction - Initial 1/1/80 ALWM 3625 Alley b/w Katella and Industrial Western Ave Mercantile Ave O AC 1 1 470 20 9,400 23 56 38 6 4/14/23 New Construction - Initial 1/1/80 ALYTP 130 Alley b/w Tina and Pacific Sherrill St Magnolia Ave O AC 4 1 1,116 20 22,320 36 68 27 5 3/1/23 New Construction - Initial 6/1/93 ALESNT 3700 Alley e/ Sentry Dr 2nd St North End O AC 6 1 215 25 5,375 38 52 48 0 4/14/23 New Construction - Initial 1/1/80 ALBCO 3605 Alley b/w Camus Ln and Orrway Dr Lampson Ave Samura Pl O AC 3 1 375 20 7,500 39 65 34 1 4/14/23 New Construction - Initial 1/1/80 ALCLU 3695 Alley b/w Lullaby and Cerritos Yana Dr West End O AC 5 1 120 20 2,400 40 52 38 10 4/14/23 New Construction - Initial 1/1/80 ALEARR 3615 Alley e/ Arrowhead St Arrowhead St Arrowhead St O AC 3 1 895 20 17,900 40 38 54 8 4/14/23 New Construction - Initial 1/1/80 ALCHCT 3672 Alley b/w Chestnut and Court Begin AC 115' N/ Main St Main St O AC 4 1 100 15 1,500 42 16 58 26 4/14/23 New Construction - Initial 1/1/80 ALDTOK 3630 Alley b/w Date and Oak Summerwood Ln Central Ave O AC 6 1 300 15 4,500 42 3 97 0 4/14/23 New Construction - Initial 1/1/80 ALBCH 3660 Alley b/w Beach and Chestnut Chester Ave Katella Ave O AC 4 1 235 15 3,525 43 30 61 9 4/14/23 New Construction - Initial 1/1/80 ALBCH 3664 Alley b/w Beach and Chestnut Main St Pacific St O AC 4 1 540 15 8,100 46 43 49 8 4/14/23 New Construction - Initial 1/1/80 ALBCH 3662 Alley b/w Beach and Chestnut Cerritos Ave Main St O AC 4 1 585 15 8,775 48 78 21 1 4/14/23 New Construction - Initial 1/1/80 ALCHCT 3675 Alley b/w Chestnut and Court Main St End AC 140' S/ Main St O AC 4 1 140 20 2,800 53 14 85 1 4/14/23 New Construction - Initial 1/1/80 ALYCS 40 Alley b/w Court and Sycamore Cerritos Ave End AC O AC 4 1 80 20 1,600 53 26 74 0 3/22/23 New Construction - Initial 1/1/80 ALYVM 90 Alley b/w Magnolia and Vinevale Cris Ave Pacific Ave O AC 4 1 353 20 7,060 53 38 60 2 4/10/23 New Construction - Initial 7/1/60 ALOKCD 3638 Alley b/w Oak and Cedar Chester Ave Katella Ave O AC 6 1 240 15 3,600 53 32 38 30 4/14/23 New Construction - Initial 1/1/80 ALCHCT 3670 Alley b/w Chestnut and Court Cerritos Ave End PCC 115' N/ Main St O PCC 4 1 480 15 7,200 56 55 13 32 4/14/23 New Construction - Initial 1/1/80 ALOKCD 3636 Alley b/w Oak and Cedar Monroe Ave Central Ave O AC 6 1 270 15 4,050 56 56 40 4 4/14/23 New Construction - Initial 1/1/80 ALCHCT 3674 Alley b/w Chestnut and Court Chestnut Ave Alley 3670 O PCC 4 1 125 15 1,875 57 93 7 0 4/14/23 New Construction - Initial 1/1/80 ALDTOK 3632 Alley b/w Date and Oak Central Ave Katella Ave O AC 6 1 575 14 8,050 57 49 48 3 4/14/23 New Construction - Initial 1/1/80 ALCDRS 3640 Alley b/w Cedar and Rose North End Monroe Ave O PCC 6 1 275 15 4,125 58 46 10 44 4/14/23 New Construction - Initial 1/1/80 ALYFB 3655 Alley b/w Flower and Beach Central Ave Chester Ave O PCC 6 1 270 15 4,050 60 57 5 38 4/14/23 New Construction - Initial 1/1/80 ALYRF 115 Alley b/w Rose and Flower Main St Pacific St O PCC 6 1 400 20 8,000 61 60 15 25 4/7/23 New Construction - Initial 1/1/56 ALYCS 42 Alley b/w Court and Sycamore Begin PCC (S/ Cerritos Ave) Main St O PCC 4 1 505 20 10,100 62 70 18 12 3/22/23 New Construction - Initial 1/1/56 ALPB 3690 Alley s/ Pacific and w/ Beach Pacific Ave Beach Blvd O AC 4 1 930 20 18,600 62 46 54 0 4/14/23 New Construction - Initial 1/1/80 ALYCP 50 Alley b/w Criss Ave and Pacific Ave Alley b/w Magnolia and Vinevale Vinevale St O AC 4 1 322 20 6,440 63 52 48 0 4/10/23 New Construction - Initial 7/1/60 ALYFB 3656 Alley b/w Flower and Beach Chester Ave Katella Ave O PCC 6 1 240 15 3,600 64 70 22 8 4/14/23 New Construction - Initial 1/1/80 ALOKCD 3635 Alley b/w Oak and Cedar North End Monroe Ave O AC 6 1 275 15 4,125 64 16 25 59 4/14/23 New Construction - Initial 1/1/80 ALYRF 3650 Alley b/w Rose and Flower Central Ave Chester Ave O PCC 6 1 270 15 4,050 65 64 20 16 4/14/23 New Construction - Initial 1/1/80 ALCDRS 3645 Alley b/w Cedar and Rose Chester Ave Katella Ave O PCC 6 1 240 15 3,600 68 28 32 40 4/14/23 New Construction - Initial 1/1/80 ALCHCT 3678 Alley b/w Chestnut and Court Chestnut Ave Alley 3675 O AC 4 1 130 15 1,950 68 12 88 0 4/14/23 New Construction - Initial 1/1/80 ALYRF 3652 Alley b/w Rose and Flower Chester Ave Katella Ave O PCC 6 1 240 15 3,600 69 42 21 37 4/14/23 New Construction - Initial 1/1/80 ALCHCT 3676 Alley b/w Chestnut and Court Begin PCC 140' S/ Main St Chestnut Ave O PCC 4 1 400 20 8,000 71 33 17 50 4/14/23 New Construction - Initial 1/1/80 ALYRF 110 Alley b/w Rose and Flower Cerritos Ave Main St O PCC 6 1 590 20 11,800 71 61 31 8 4/7/23 New Construction - Initial 1/1/56 ALSYF 3685 Alley b/w Sycamore and Fern Main St Pacific St O PCC 4 1 445 15 6,675 72 76 16 8 4/14/23 New Construction - Initial 1/1/80 ALWYS 3698 Alley b/w Wyatt and Sentry Cody Dr North End O AC 6 1 370 20 7,400 72 50 48 2 4/14/23 New Construction - Initial 1/1/80 ALCDRS 3644 Alley b/w Cedar and Rose Central Ave Chester Ave O PCC 6 1 275 15 4,125 73 58 24 18 4/14/23 New Construction - Initial 1/1/80 ALYDO 70 Alley b/w Davmor and Orangewood Santa Rosalia St Lenmar St O AC 1 1 1,199 20 23,980 73 35 62 3 3/18/23 New Construction - Initial 1/1/97 ALYDO 75 Alley b/w Davmor and Orangewood Lenmar St East End O AC 1 1 310 20 6,200 73 26 72 2 3/18/23 New Construction - Initial 1/1/97 ALSYF 3680 Alley b/w Sycamore and Fern Cerritos Ave Main St O PCC 4 1 580 15 8,700 73 58 10 32 4/14/23 New Construction - Initial 1/1/80 ALYCS 45 Alley b/w Court and Sycamore Main St Pacific St O PCC 4 1 445 20 8,900 74 52 24 24 3/22/23 New Construction - Initial 1/1/56 ALOKCD 3637 Alley b/w Oak and Cedar Central Ave Chester Ave O AC 6 1 270 15 4,050 77 48 52 0 4/14/23 New Construction - Initial 1/1/80 ALYFB 86 Alley b/w Flower and Beach Begin PCC (S/ Main St) Pacific St O PCC 6 1 225 20 4,500 79 73 27 0 4/7/23 New Construction - Initial 1/1/80

Page 8 of 9 ends

City of Stanton, CA
Pavement Condition Index (PCI) Report - All Streets
Sorted by Rank, Name Order (A-Z)
BranchID Sec ID Name From To Rank Surface Type Shoulder Zone Lanes L W True Area PCI % Load % Climate % Other Insp. Date Work History Type Work History Date ALYS 140 Alley s/ Cerritos and e/ of Sylvan Cerritos Ave (W) Sylvan St O AC 4 1 410 20 8,200 83 47 8 45 4/10/23 Reconstruct Structure (AC) 2/1/19 ALCDRS 3642 Alley b/w Cedar and Rose Monroe Ave Central Ave O PCC 6 1 270 15 4,050 84 59 33 8 4/17/23 Complete Reconstruction - PCC 1/1/00 ALBCH 3665 Alley b/w Beach and Chestnut Alley 3664 Chestnut Ave O PCC 4 1 120 15 1,800 86 0 20 80 4/14/23 New Construction - Initial 1/1/80 ALYWIN 120 Alley b/w Sonnet and Dale Winston Rd End O AC 5 1 496 20 9,920 94 0 100 0 3/1/23 New Construction - AC 2/1/19 ALWCL 3600 Alley w/ Camus Ln and s/ Lampson Av Camus Ln Gate O AC 3 1 430 20 8,600 94 0 88 12 4/14/23 New Construction - Initial 1/1/80 ALEORR 3610 Alley e/ Orrway and s/ Lampson Orrway Dr Gate O AC 3 1 430 20 8,600 95 0 100 0 4/14/23 New Construction - Initial 1/1/80 ALYS 142 Alley s/ Cerritos and e/ of Sylvan Sylvan St Cerritos Ave (E) O AC 4 1 410 20 8,200 95 0 87 13 4/10/23 Reconstruct Structure (AC) 2/1/19 ALYPAL 100 Alley b/w Ramblewood and Western Palais Rd Western Ave O PCC 7 1 598 18 10,764 98 0 100 0 3/2/23 Complete Reconstruction - PCC 1/1/18 ALYDY 60 Alley b/w Dale Ave and Yana Dr Lola Ave Chanticleer Rd O AC 5 1 980 20 18,620 100 0 0 0 2/27/25 Overlay - AC Structural 2/27/25 ALORLE 3620 Alley b/w Orangewood and Lessue Santa Rosalia St Lenmar St O AC 2 1 1,195 20 23,900 100 0 0 0 2/27/25 Overlay - AC Structural 2/27/25

4.4 430,554

Page 9 of 9 ends

City of Stanton, CA
Pavement Condition Index (PCI) Report - All Streets
Sorted by Rank, PCI Order 0-100)
BranchID Sec ID Name From To Rank Surface Type Shoulder Zone Lanes L W True Area PCI % Load % Climate % Other Insp. Date Work History Type Work History Date Arterials / Collectors
KAT WB 1760 KATELLA AVE WB Beach Blvd Cedar St C AC C&G 8 3 820 33 34,447 42 70 30 0 1/27/25 SLURRY SEAL 1/31/15 WESTR 3465 WESTERN AVE RR Tracks Katella Ave C AC C&G 8 4 1,255 60 76,699 44 52 36 12 1/28/25 New Construction - Initial 3/1/04 KAT EB 1710 KATELLA AVE EB Western Ave RR Tracks C AC C&G 8 3 790 36 29,400 46 74 26 0 1/27/25 SLURRY SEAL 1/31/15 WESTR 3460 WESTERN AVE Cerritos Ave RR Tracks C AC C&G 8 4 1,268 60 78,730 48 43 44 13 1/28/25 New Construction - Initial 3/1/04 KAT WB 1765 KATELLA AVE WB RR Tracks Western Ave C AC C&G 8 3 790 38 35,816 51 69 31 0 1/27/25 SLURRY SEAL 1/31/15 KAT WB 1762 KATELLA AVE WB Cedar St RR Tracks C AC C&G 8 3 975 38 40,966 54 49 39 12 1/27/25 SLURRY SEAL 1/31/15 KAT EB 1700 KATELLA AVE EB Knott Ave Bradford St C AC C&G 8 3 1,560 40 64,664 55 52 45 3 1/27/25 SLURRY SEAL 1/31/15 KAT WB 1775 KATELLA AVE WB Bradford St Knott Ave C AC C&G 8 3 1,560 40 63,865 57 41 59 0 1/27/25 SLURRY SEAL 1/31/15 KAT EB 1712 KATELLA AVE EB RR Tracks Cedar St C AC C&G 8 3 975 36 40,796 61 55 45 0 1/27/25 SLURRY SEAL 1/31/15 KAT EB 1705 KATELLA AVE EB Bradford St Western Ave C AC C&G 8 3 1,205 40 49,499 61 53 47 0 1/27/25 SLURRY SEAL 1/31/15 CER 715 CERRITOS AVE City Limits (Sylvan St) City Limits (Alley 142) C AC 8 4 160 60 9,658 63 39 38 23 1/28/25 New Construction - Initial 1/1/80 KAT WB 1770 KATELLA AVE WB Western Ave Bradford St C AC C&G 8 3 1,205 40 50,369 65 48 51 1 1/27/25 SLURRY SEAL 1/31/15 KAT EB 1715 KATELLA AVE EB Cedar St Beach Blvd C AC C&G 8 3 820 36 38,271 69 44 52 4 1/27/25 SLURRY SEAL 1/31/15 CHAP 772 CHAPMAN AVE Briarwood St (EB Only) Dale St (EB Only) C AC C&G 8 2 690 40 26,954 73 30 66 4 1/28/25 New Construction - Initial 7/1/04 DAL 1090 DALE AVE Chapman Ave Amy Ave C AAC C&G 8 4 455 45 24,321 74 71 29 0 1/23/25 ARHM Overlay (2.0 W/LEVEL) 12/14/10 KAT WB 1755 KATELLA AVE WB Pvmnt Change (250' W/ Boatman Av) Beach Blvd C AAC C&G 8 3 1,445 45 72,047 76 28 20 52 1/27/25 SLURRY SEAL 1/31/15 ORA 2440 ORANGEWOOD AVE Santa Rosalia Ave Beach Blvd C AC 8 4 1,636 60 95,338 77 0 96 4 1/23/25 AC Overlay 4/1/13 LAMP 1960 LAMPSON AVE City Limit (W) Beach Blvd C AC C&G 8 4 1,755 60 103,740 77 76 24 0 1/21/25 Mill, Overlay w/Fabric (1.5 in) 4/8/19 CHAP 774 CHAPMAN AVE Dale St (EB Only) City Limit (EB Only) C AC C&G 8 2 565 40 21,029 78 8 84 8 1/28/25 New Construction - Initial 7/1/04 MAG 2215 MAGNOLIA AVE Pacific Ave RR Tracks B AAC C&G 8 4 325 80 25,721 82 69 24 7 1/28/25 Mill, Overlay w/Fabric (1.5 in) 4/8/19 ORA 2430 ORANGEWOOD AVE Santa Rosalia Ave West End C AC C&G 8 2 50 58 8,331 82 0 98 2 1/23/25 AC Overlay 3/8/13 KAT EB 1720 KATELLA AVE EB Beach Blvd Pvmnt Change (250' W/ Boatman Av) C AAC C&G 8 3 1,445 45 61,493 83 22 63 15 1/27/25 SLURRY SEAL 1/31/15 CER 720 CERRITOS AVE City Limit (350' W/ Magnolia) Magnolia Ave C AAC C&G 8 4 355 60 20,684 84 0 100 0 1/28/25 Slurry Seal 8/1/10 MAG 2218 MAGNOLIA AVE RR Tracks City Limits (130' N/ Syracuse Ave) B AAC C&G 8 4 335 80 27,964 86 65 35 0 1/28/25 Mill, Overlay w/Fabric (1.5 in) 4/8/19 KNO 1890 KNOTT AVE City Limit (N) Cerritos Ave B AC C&G 8 4 426 80 33,873 86 38 62 0 1/28/25 Mill, Overlay w/Fabric (1.5 in) 3/25/19 DAL 1092 DALE AVE Amy Ave Blanche Ave C AAC C&G 8 2 320 32 11,293 88 30 70 0 1/21/25 ARHM Overlay (2.0 W/LEVEL) 12/14/10 ORA 2450 ORANGEWOOD AVE Beach Blvd City Limit (E) C AC C&G 8 4 1,300 58 76,666 88 0 100 0 1/23/25 Mill, Overlay w/Fabric (1.5 in) 4/8/19 KNO 1905 KNOTT AVE Kermore Ln Katella Ave B AC C&G 8 4 890 80 90,825 88 78 19 3 1/27/25 Mill, Overlay w/Fabric (1.5 in) 4/8/19 KNO 1900 KNOTT AVE Cerritos Ave Kermore Ln B AC C&G 8 4 1,625 80 129,910 88 83 16 1 1/27/25 Mill, Overlay w/Fabric (1.5 in) 4/8/19 KNO 1910 KNOTT AVE Katella Ave City Limit (S) B AC C&G 8 4 1,215 80 101,751 89 0 76 24 1/20/25 Grind and Overlay (2") 3/25/19 KAT EB 1730 KATELLA AVE EB City Limits (560' W/ Mac Murray St) City Limits (260' E/ Mac Murray St) A AC 8 3 815 35 32,627 90 64 36 0 1/28/25 ARHM Overlay (1.5 in) 12/31/22 MAG 2212 MAGNOLIA AVE Cerritos Ave Pacific Ave B AAC C&G 8 4 975 80 76,991 91 26 66 8 1/28/25 Mill, Overlay w/Fabric (1.5 in) 4/8/19 GGB 1420 GARDEN GROVE BLVD Beach Blvd Fern Ave B AAC 8 4 1,295 80 92,739 92 59 41 0 1/8/25 ARHM Overlay (1.5 in) 12/31/22 KAT WB 1740 KATELLA AVE WB City Limits (260' E/ Mac Murray St) City Limits (560' W/ Mac Murray St) A AC 8 3 840 33 29,157 93 0 100 0 1/28/25 ARHM Overlay (1.5 in) 12/31/22 DAL 1086 DALE AVE Katella Ave City Limits (S) C AC 8 3 820 60 12,299 93 0 100 0 1/28/25 ARHM Overlay (1.5 in) 12/31/22 KAT EB 1735 KATELLA AVE EB City Limits (200' W/ Magnolia St) Magnolia St A AC 8 3 250 52 11,427 93 36 64 0 1/28/25 ARHM Overlay (1.5 in) 12/31/22 CER 730 CERRITOS AVE Magnolia Ave City Limit (1110' E/ Magnolia Ave) C AC C&G 8 4 1,110 60 65,795 93 0 100 0 1/28/25 Surface Treatment - Slurry Seal 12/31/22 LAMP 1970 LAMPSON AVE Beach Blvd City Limit (E) C AC C&G 8 4 930 60 58,507 93 0 15 85 1/21/25 ARHM Overlay (1.5 in) 12/31/22 CER 710 CERRITOS AVE Dale Ave City Limit (170' W/ Sherrill St) C AAC C&G 8 4 1,330 60 78,951 94 0 89 11 1/14/25 Mill, Overlay w/Fabric (1.5 in) 4/8/19 DAL 1080 DALE AVE Cerritos Ave RR Tracks C AAC C&G 8 4 1,310 60 78,047 94 0 100 0 12/12/24 Overlay - AC Structural 1/1/21 DAL 1095 DALE AVE Blanche Ave (SB Only) City Limits (SB Only) C AAC C&G 8 2 510 32 14,668 94 0 78 22 1/21/25 ARHM Overlay (2.0 W/LEVEL) 12/14/10 MAG 2210 MAGNOLIA AVE City Limits (130' N/ Cerritos Ave) Cerritos Ave B AAC C&G 8 4 165 80 13,847 94 0 100 0 1/28/25 Mill, Overlay w/Fabric (1.5 in) 4/8/19 MAG 2220 MAGNOLIA AVE City Limits (150' S/ Syracuse) Katella Ave B AC C&G 8 4 605 80 38,617 95 0 100 0 1/28/25 ARHM Overlay (1.5 in) 12/31/22 CHAP 770 CHAPMAN AVE Beach Blvd Briarwood St C AC C&G 8 4 1,915 70 130,002 96 0 100 0 12/9/24 ARHM Overlay (1.5 in) 12/31/22 KAT WB 1738 KATELLA AVE WB Magnolia Ave City Limits (200' W/ Magnolia St) A AC 8 3 250 34 9,765 97 0 100 0 1/28/25 ARHM Overlay (1.5 in) 12/31/22 DAL 1070 DALE AVE City Limit (150' N/ Lola) Chanticleer Rd C AC C&G 8 4 1,190 60 70,443 98 0 100 0 12/12/24 ARHM Overlay (1.5 in) 12/31/22 DAL 1075 DALE AVE Chanticleer Rd Cerritos Ave C AC C&G 8 4 800 60 46,808 98 0 100 0 12/12/24 ARHM Overlay (1.5 in) 12/31/22 CHAP 760 CHAPMAN AVE City Limit (210' W/ Santa Paula) Beach Blvd C AAC C&G 8 5 565 80 44,050 99 0 100 0 12/9/24 Surface Treatment - Slurry Seal 12/31/22 KAT EB 1725 KATELLA AVE EB Pvmnt Change (250' W/ Boatman Av) Dale Ave C AAC C&G 8 3 1,120 45 54,348 99 0 100 0 1/27/25 Overlay - AC Thin 3/20/09 KAT WB 1750 KATELLA AVE WB Dale Ave Pvmnt Change (250' W/ Boatman Av) C AAC C&G 8 3 1,120 45 46,861 99 0 100 0 1/27/25 SLURRY SEAL 1/31/15 ORA 2420 ORANGEWOOD AVE Western Ave East End C AC C&G 8 2 500 59 32,969 99 0 100 0 12/9/24 Complete Reconstruction - AC 12/31/22 WESTR 3450 WESTERN AVE City Limit (100' N/ Palais Rd) Cerritos Ave C AC C&G 8 4 1,290 60 77,863 99 0 100 0 1/22/25 Surface Treatment - Slurry Seal 12/31/22 CER 680 CERRITOS AVE Knott Ave Lowden St C AC C&G 8 4 1,345 60 75,397 100 0 0 0 1/8/25 Slurry Seal 8/1/10 CER 685 CERRITOS AVE Lowden St Western Ave C AC C&G 8 4 1,325 60 78,386 100 0 0 0 1/9/25 Slurry Seal 8/1/10 CER 690 CERRITOS AVE Western Ave Peppertree Ln C AC C&G 8 4 1,290 60 76,064 100 0 0 0 1/10/25 Slurry Seal 8/1/10 CER 695 CERRITOS AVE Peppertree Ln Beach Blvd C AC C&G 8 4 1,320 60 79,044 100 0 0 0 1/10/25 Slurry Seal 8/1/10

Page 1 of 9 ends

City of Stanton, CA
Pavement Condition Index (PCI) Report - All Streets
Sorted by Rank, PCI Order 0-100)
BranchID Sec ID Name From To Rank Surface Type Shoulder Zone Lanes L W True Area PCI % Load % Climate % Other Insp. Date Work History Type Work History Date CER 700 CERRITOS AVE Beach Blvd (EB) Fern Ave (EB) C AAC C&G 8 2 1,240 30 28,238 100 0 0 0 2/27/25 Overlay - AC Structural 2/27/25 CER 702 CERRITOS AVE Fern Ave (EB) Dale Ave (EB) C AAC C&G 8 2 1,330 22 32,091 100 0 0 0 2/27/25 Overlay - AC Structural 2/27/25 CER 704 CERRITOS AVE Dale Ave (WB) Fern Ave (WB) C AAC C&G 8 2 1,330 22 36,190 100 0 0 0 2/27/25 Overlay - AC Structural 2/27/25 CER 706 CERRITOS AVE Fern Ave (WB) Beach Blvd (WB) C AAC C&G 8 2 1,240 30 44,212 100 0 0 0 2/27/25 Overlay - AC Structural 2/27/25 DAL 1085 DALE AVE RR Tracks Katella Ave C AAC C&G 8 4 1,270 60 75,982 100 0 0 0 12/12/24 Overlay - AC Structural 11/4/24 WESTR 3470 WESTERN AVE Katella Ave Carie Ln C AC C&G 8 4 1,080 60 65,855 100 0 0 0 2/27/25 Overlay - AC Structural 2/27/25 WESTR 3475 WESTERN AVE Carie Ln Orangewood Ave C AC C&G 8 3 1,508 60 89,800 100 0 0 0 2/27/25 Overlay - AC Structural 2/27/25 WESTR 3480 WESTERN AVE Orangewood Ave City Limit (150' S/ Seaboard Cir) C AC C&G 8 3 1,330 60 78,379 100 0 0 0 2/27/25 Overlay - AC Structural 2/27/25

12.0 3,421,539
Locals
MACST 2185 MAC ST Katella Frontage City Limits E AC 4 2 110 32 3,088 24 58 21 21 1/28/25 New Construction - Initial 1/1/80 LAM 1940 LAMBERT WAY Fulton Way Longford Way E AC C&G 1 2 110 18 1,631 30 89 11 0 1/27/25 New Construction - AC 8/14/12 SNTB 2800 SANTA BARBARA AVE Santa Cruz Ave Santa Paula Ave E AC C&G 2 2 820 34 29,435 34 84 14 2 12/9/24 New Construction 2/14/11 CHA 740 CHANTICLEER RD Dale Ave MacDuff St E AC C&G 5 2 935 36 30,991 35 82 15 3 1/14/25 AC Overlay (2 in) 2/14/12 RAM 2630 RAMBLEWOOD DR Cerritos Ave Idyllwild Dr E AC C&G 7 2 315 36 11,060 40 75 25 0 1/21/25 New Construction - Initial 7/1/56 SON 3050 SONNET ST Chanticleer Rd Palais Rd E AC C&G 5 2 390 36 13,154 41 63 35 2 1/22/25 AC Overlay (2 in) 2/14/12 RAM 2640 RAMBLEWOOD DR Idyllwild Dr Cul-De-Sac E AC C&G 7 2 156 34 8,093 41 52 39 9 1/21/25 New Construction - Initial 6/1/05 STARR 3115 STARR ST Lotus Ct Fern Ave E AC C&G 5 2 590 36 22,516 42 79 16 5 12/12/24 AC Overlay (2 in) 2/14/12 LUL 2170 LULLABY LN Yana Dr Cul-De-Sac E AC C&G 5 2 455 34 16,793 42 77 23 0 1/14/25 AC Overlay (2 in) 2/14/12 IDY 1640 IDYLLWILD DR Western Ave End E AC C&G 6 2 381 36 13,410 43 66 26 8 1/23/25 Slurry Seal or Chip Seal 12/19/06 CHE 782 CHESTER AVE Rose St Flower Ave E AC C&G 6 2 295 33 9,505 44 49 38 13 1/28/25 New Construction - Initial 1/1/56 EME 1250 EMERSON WAY Bradford Pl Fulton Way E AC C&G 1 2 175 30 5,217 44 44 36 20 1/23/25 AC Overlay (2 in) 8/14/12 CHA 750 CHANTICLEER RD Fern Ave Dale Ave E AC C&G 5 2 1,265 36 41,155 45 74 26 0 1/22/25 AC Overlay (2 in) 2/14/12 MON 2358 MONROE AVE Stanton Storm Channel Dale Ave E AC C&G 4 2 880 40 35,251 45 64 36 0 12/12/24 New Construction - Initial 7/1/59 MAI 2230 MAIN ST Rose St Beach Blvd E AC C&G 6 2 600 50 31,249 46 80 17 3 1/10/25 New Construction - Initial 1/1/56 GAR 1440 GARRET RD Cody Dr City Limit E AC C&G 6 2 505 34 16,875 46 87 13 0 1/9/25 Slurry Seal or Chip Seal 2/10/09 ROS 2670 ROSE ST Cerritos Ave Pacific St E AAC C&G 6 2 965 36 34,513 46 58 18 24 1/23/25 Overlay - AC Thin 5/9/07 STAN 3075 STANFORD AVE Court St Fern St E AC C&G 3 2 670 32 21,358 46 61 27 12 1/21/25 New Construction - Initial 1/1/56 COU 930 COURSON DR Idyllwild Dr Cul-De-Sac (S) E AC C&G 7 2 256 34 8,021 46 54 46 0 12/12/24 New Construction - Initial 7/1/56 TRO 3280 TROJAN WAY Fulton Way End E AC C&G 1 2 135 30 3,059 46 71 11 18 1/23/25 AC Overlay (2 in) 8/14/12 ASH 230 ASHDALE ST Cerritos Ave Cul-De-Sac (N) E AC C&G 5 2 532 36 19,150 47 67 28 5 1/14/25 New Construction - Initial 7/1/60 BRI 462 BRIARWOOD ST Winterwood Ave Brittany Ln E AC C&G 3 2 890 36 31,788 47 78 10 12 12/9/24 ARHM Overlay (2.0 in) 4/1/11 SNTRO 2920 SANTA ROSALIA AVE Lampson Ave Bently Ave E AC C&G 3 2 1,270 34 42,174 47 74 10 16 1/13/25 Slurry Seal 8/1/13 IDY 1635 IDYLLWILD DR Courson Dr Ramblewood Dr E AC C&G 7 2 225 34 7,816 47 75 25 0 1/21/25 New Construction - Initial 6/1/05 SYC 3160 SYCAMORE AVE Stanford Ave Acacia Ave E AC C&G 3 2 600 36 20,701 47 68 13 19 1/8/25 New Construction - Initial 7/1/25 MAI 2235 MAIN ST Beach Blvd Chestnut Ave E AC C&G 4 2 250 52 12,400 47 88 11 1 1/10/25 New Construction - Initial 1/1/56 CHE 780 CHESTER AVE Oak St Rose St E AC C&G 6 2 620 33 19,656 48 63 23 14 1/23/25 New Construction - Initial 1/1/56 CHES 820 CHESTNUT AVE Cerritos Ave Main St E AC C&G 4 2 600 36 24,006 48 90 10 0 1/14/25 New Construction - Initial 1/1/56 PAR 2530 PARK PLAZA Beach Blvd Cul-De-Sac E AC C&G 3 2 285 40 12,376 48 74 6 20 1/13/25 Thin AC Overlay (1.5 in) 8/1/13 ACA 10 ACACIA AVE Beach Blvd Court St E AC C&G 3 2 620 36 21,465 48 77 14 9 1/8/25 New Construction - Initial 7/1/25 HAM 1500 HAMDEN AVE Middlesex Dr Cul-De-Sac E AC C&G 7 2 312 34 12,396 49 53 47 0 12/12/24 New Construction - Initial 6/1/05 LEA 2000 LEAFWOOD ST Briarwood St Winterwood Ave E AC C&G 3 2 805 34 28,466 49 87 13 0 12/9/24 ARHM Overlay (2.0 in) 3/23/10 PEN 2540 PENN WY Bragg Way Carlton Way E AC C&G 1 2 260 30 8,199 50 90 10 0 1/27/25 AC Overlay (2 in) 8/14/12 SNTRO 2925 SANTA ROSALIA AVE Bently Ave City Limits (Vanguard Cir) E AC C&G 3 2 1,030 34 34,724 50 77 23 0 1/13/25 Slurry Seal 8/1/13 HARR 1550 HARRIET ST Yana Dr Cul-De-Sac E AC C&G 5 2 430 34 16,835 50 71 29 0 1/13/25 AC Overlay (2 in) 2/14/12 COD 840 CODY DR Western Ave Courtright Rd E AC C&G 6 2 765 32 24,281 50 89 11 0 1/9/25 Slurry Seal or Chip Seal 2/10/09 COU 900 COURSON DR Idyllwild Dr Cul-De-Sac (N) E AC C&G 7 2 268 34 12,212 51 50 50 0 12/12/24 New Construction - Initial 6/1/05 IDY 1630 IDYLLWILD DR Asbury Ave Courson Dr E AC C&G 7 2 225 34 8,245 51 75 23 2 1/21/25 New Construction - Initial 6/1/05 LOWDEN 2130 LOWDEN ST Cerritos Ave Thunderbird Ln E AC C&G 7 2 1,135 34 37,256 51 54 44 2 12/12/24 New Construction - Initial 6/1/05 BRI 460 BRIARWOOD ST Catherine Ave Winterwood Ave E AC C&G 3 2 550 36 19,130 51 75 12 13 1/21/25 ARHM Overlay (2.0 in) 4/1/11 BRAG 450 BRAGG WY Fulton Way Penn Way E AC C&G 1 2 185 30 5,130 51 72 28 0 1/27/25 AC Overlay (2 in) 8/14/12 COURT 1040 COURTRIGHT RD Cody Dr City Limit (N) E AC C&G 6 2 500 34 16,393 52 81 19 0 1/9/25 Slurry Seal or Chip Seal 2/10/09 COU 920 COURSON DR Lowell Cul-De-Sac E AC C&G 7 2 116 34 5,842 52 39 61 0 12/12/24 New Construction - Initial 6/1/05 CHE 785 CHESTER AVE Flower Ave Beach Blvd E AC C&G 6 2 280 33 9,165 53 48 37 15 1/28/25 New Construction - Initial 1/1/56 HOV 1580 HOOVER ST City Limit (N/ Garden Grove Blvd) Cul-De-Sac E AC C&G 3 2 625 36 24,468 53 43 48 9 1/8/25 New Construction - Initial 1/1/56 SHER 3030 SHERRILL ST Cerritos Ave Tina Way E AC C&G 4 2 635 32 20,668 53 47 46 7 1/14/25 New Construction - Initial 6/1/05 BEN 350 BENTLY AVE Santa Rosalia Ave Fieldgate St E AC C&G 3 2 800 34 26,634 53 79 16 5 1/13/25 Slurry Seal 8/1/13 COUR 1010 COURT AVE Acacia Ave Garden Grove Blvd E AC C&G 3 2 630 36 22,249 53 61 34 5 1/8/25 New Construction - Initial 1/1/56

Page 2 of 9 ends

City of Stanton, CA
Pavement Condition Index (PCI) Report - All Streets
Sorted by Rank, PCI Order 0-100)
BranchID Sec ID Name From To Rank Surface Type Shoulder Zone Lanes L W True Area PCI % Load % Climate % Other Insp. Date Work History Type Work History Date IDY 1638 IDYLLWILD DR Ramblewood Dr Western Ave E AC C&G 7 2 220 34 7,523 53 59 41 0 1/21/25 New Construction - Initial 6/1/05 BRI 464 BRIARWOOD ST Brittany Ln Chapman Ave E AC C&G 3 2 725 36 25,264 54 77 23 0 12/9/24 ARHM Overlay (2.0 in) 4/1/11 MID 2320 MIDDLESEX ST Lowden St Ashbury Ave E AC C&G 7 2 491 34 16,514 54 65 35 0 1/21/25 New Construction - Initial 6/1/05 STARR 3110 STARR ST Beach Blvd Lotus Ct E AC C&G 5 2 645 36 22,170 54 58 42 0 12/12/24 AC Overlay (2 in) 2/14/12 ASB 180 ASBURY AVE Idyllwild Dr Thunderbird Ln E AC C&G 7 2 790 34 25,941 54 59 41 0 1/21/25 New Construction - Initial 6/1/05 FER 1300 FERN ST Chanticleer Rd Cerritos Ave E AC C&G 5 2 760 36 24,735 54 81 19 0 1/27/25 Cold Mill/Overlay 8/14/12 RAM 2650 RAMBLEWOOD DR Lowell St Thunderbird Ln E AC C&G 7 2 362 34 12,345 54 57 43 0 1/21/25 New Construction - Initial 6/1/05 MAC 2200 MACDUFF ST Lola Ave Chanticleer Rd E AC C&G 5 2 1,036 36 30,590 55 82 18 0 1/14/25 Surface Treatment - Slurry Seal 1/31/20 OAK 2390 OAK ST Katella Ave Central Ave E AC C&G 6 2 580 34 21,728 55 55 32 13 1/21/25 New Construction - Initial 7/1/55 STANT 3080 STANTON AVE Santa Catalina Ave Cul-De-Sac E AC C&G 2 2 1,220 28 38,140 55 64 23 13 1/20/25 New Construction - Initial 1/1/97 LEN 2030 LENMAR AVE Orangewood Ave Lessue Ave E AC C&G 2 2 426 33 14,688 56 60 36 4 12/12/24 New Construction - Initial 1/1/97 VAS 3320 VASSAR WY College Dr South End E AC C&G 6 2 255 20 4,027 56 83 14 3 1/22/25 Cold Mill and Overlay - 2 Inches 6/1/15 LOWELL 2160 LOWELL ST Lowden St Litchfield Ave E AC C&G 7 2 170 34 7,623 56 61 39 0 12/12/24 New Construction - Initial 6/1/05 LIT 2070 LITCHFIELD AVE Lowell St Cul-De-Sac E AC C&G 7 2 291 34 11,607 57 61 39 0 12/12/24 New Construction - Initial 6/1/05 ION 1660 IONA WY College Dr End E AC C&G 6 2 120 20 1,690 57 95 5 0 1/22/25 Surface Treatment - Slurry Seal 1/31/20 SAN 2780 SAN MARCOS DR Lampson Ave Cardiff Dr E AC C&G 3 2 790 32 21,355 58 57 41 2 1/23/25 Surface Treatment - Slurry Seal 2/27/25 LES 2040 LESSUE AVE Santa Rosalia Stanton Ave E AC C&G 2 2 1,520 33 50,134 58 76 24 0 1/20/25 New Construction - Initial 2/1/96 ACA 15 ACACIA AVE Court St Fern St E AC C&G 3 2 625 36 21,649 58 50 22 28 1/8/25 New Construction - Initial 7/1/25 COUR 950 COURT AVE Monroe Ave Cul-De-Sac (N) E AC C&G 4 2 275 36 11,027 58 68 20 12 12/12/24 New Construction - Initial 1/1/56 HOP 1590 HOPI RD Santa Rosalia Ave Stanton Ave E AC C&G 2 2 1,520 32 50,655 59 53 45 2 1/20/25 New Construction - Initial 2/1/96 COD 845 CODY DR Courtright Rd Sentry Dr E AC C&G 6 2 720 32 23,345 60 77 23 0 1/22/25 Slurry Seal or Chip Seal 2/10/09 HAMP 1530 HAMPTON WY Fulton Way Lambert Way E AC C&G 1 2 990 30 20,547 60 72 20 8 1/23/25 Cold Mill/Overlay 4/1/13 MON 2350 MONROE AVE Beach Blvd Court Ave E AC C&G 4 2 600 40 22,607 60 43 56 1 12/12/24 New Construction - Initial 7/1/59 LOWELL 2150 LOWELL ST Asbury Ave Ramblewood Dr E AC C&G 7 2 480 36 16,759 60 46 54 0 1/21/25 New Construction - Initial 6/1/05 SNTMO 2880 SANTA MONICA AVE Santa Cruz Ave Santa Paula Ave E AC C&G 2 2 820 34 29,074 60 71 25 4 1/20/25 New Construction - Initial 7/1/53 WEST 3440 WESTCLIFF DR Del Rey Dr Carmel Dr E AC C&G 3 2 835 20 17,613 60 50 43 7 1/23/25 AC Overlay (2 in) 11/13/12 YOR 3580 YORKSHIRE AVE Santa Rosalia Ave Stanton Ave E AC C&G 2 2 1,520 34 51,057 60 49 40 11 1/20/25 New Construction - Initial 1/1/97 NAP 2370 NAPA WY College Dr End E AC C&G 6 2 120 20 1,734 61 78 22 0 1/22/25 Surface Treatment - Slurry Seal 1/31/20 SYC 3170 SYCAMORE AVE Acacia Ave Garden Grove Blvd E AC C&G 3 2 630 36 22,123 61 57 17 26 1/8/25 New Construction - Initial 7/1/32 WINT 3530 WINTERWOOD AVE Briarwood St Leafwood St E AC C&G 3 2 1,000 34 38,046 61 73 27 0 12/9/24 Surface Treatment - Slurry Seal 1/31/20 SEN 2970 SENTRY ST Cody Dr Cul-De-Sac E AC C&G 6 2 423 34 15,785 61 60 27 13 1/22/25 Slurry Seal or Chip Seal 2/10/09 MON 2355 MONROE AVE Court Ave Stanton Storm Channel E AC C&G 4 2 1,075 40 42,405 62 55 45 0 12/12/24 New Construction - Initial 7/1/59 MAL 2250 MALIBU DR Capistrano Dr Del Rey E AC C&G 3 2 85 20 5,415 62 54 21 25 1/23/25 AC Overlay (2 in) 11/13/12 STAR 3100 STARDUST LN Sherrill St Magnolia Ave E AC C&G 4 2 1,120 30 35,522 62 0 96 4 1/14/25 New Construction - Initial 6/1/05 KEL 1800 KELTON WAY Hampton Way Burton Way E AC C&G 1 2 125 30 3,522 62 63 26 11 1/28/25 Cold Mill/Overlay 4/1/13 AUT 280 AUTUMN LN Briarwood St Cul-De-Sac E AC C&G 3 2 180 40 7,819 63 74 26 0 12/9/24 Surface Treatment - Slurry Seal 1/1/21 VER 3330 VERONA ST Stardust Lane End E AC C&G 4 2 180 30 5,232 63 7 89 4 1/14/25 New Construction - Initial 6/1/05 COUR 990 COURT AVE Chester Ave Katella Ave E AC C&G 4 2 265 25 6,461 64 89 5 6 12/9/24 New Construction - Initial 1/1/56 FER 1295 FERN ST Starr St Chanticleer Rd E AC C&G 5 2 865 35 27,815 64 59 41 0 1/27/25 Cold Mill/Overlay 8/14/12 BUR 480 BURTON WY South End (@ Kelton St) North End E AC C&G 1 2 250 30 6,123 64 54 37 9 1/28/25 New Construction - Initial 6/1/05 CARL 560 CARLTON WY Penn Way Bradford Pl E AC C&G 1 2 105 30 1,908 64 40 46 14 1/23/25 AC Overlay (2 in) 8/14/12 CUS 1060 CUSTER WAY Bradford Pl Grant Way E AC C&G 1 2 280 30 5,987 64 86 14 0 1/23/25 Surface Treatment - Slurry Seal 1/31/20 VAN 3300 VANTAGE ST Chanticleer Rd Cul-De-Sac E AC C&G 5 2 150 40 6,874 64 68 32 0 1/22/25 ARHM Overlay (2.0 in) 3/23/10 LEE 2010 LEE WAY College Dr Scripps Way E AC C&G 6 2 285 20 4,267 64 74 21 5 1/22/25 Cold Mill and Overlay - 2 Inches 6/1/15 LEN 2020 LENMAR AVE Davmor Ave Orangewood Ave E AC C&G 1 2 266 33 8,910 64 56 40 4 1/20/25 AC Overlay (2 in) 11/13/12 SNTC 2810 SANTA CATALINA AVE Santa Rosalia Ave Santa Paula Ave E AC C&G 2 2 1,400 34 50,000 65 53 43 4 12/9/24 New Construction - Initial 2/1/96 WAS 3420 WASCO RD Lola Ave Chanticleer Rd E AC C&G 5 2 870 34 28,911 65 80 20 0 1/10/25 Surface Treatment - Slurry Seal 1/31/20 BRAP 410 BRADFORD PL Bradford St Katella Ave E AC 1 2 980 36 37,109 65 41 59 0 1/20/25 AC Overlay (2 in) 8/14/12 KEN 1820 KENMORE ST Stardust Ln South End E AC C&G 4 2 180 30 5,206 65 15 85 0 1/14/25 New Construction - Initial 6/1/05 ELE 1240 ELECTRIC WAY Court Ave Cul-De-Sac E AC C&G 4 2 690 36 33,846 66 58 38 4 12/12/24 New Construction - Initial 7/1/59 PACAVE 2500 PACIFIC AVE Sherill St Magnolia Ave E AC C&G 4 2 1,190 32 31,292 66 59 37 4 1/14/25 Slurry Seal or Chip Seal 12/18/06 STAN 3070 STANFORD AVE Beach Blvd Court St E AC C&G 3 2 640 32 20,554 66 48 28 24 1/21/25 New Construction - Initial 1/1/56 TIN 3260 TINA WY Sherrill St Magnolia Ave E AC C&G 4 2 1,110 30 29,269 66 64 36 0 1/14/25 Surface Treatment - Slurry Seal 1/31/20 COUR 960 COURT AVE Monroe Ave South End E AC C&G 4 2 340 36 12,112 67 52 48 0 12/12/24 New Construction - Initial 1/1/56 COURLN 1025 COURT LN Orangewood Ave End E AC 2 2 135 36 4,641 67 0 100 0 1/21/25 New Construction - Initial 1/1/80 CHES 830 CHESTNUT AVE Main St Pacific St E AC C&G 4 2 550 36 23,545 67 86 14 0 1/14/25 New Construction - Initial 1/1/56 SHER 3035 SHERRILL ST Tina Way Pacific Ave E AC C&G 4 2 350 32 9,303 68 42 55 3 1/14/25 New Construction - Initial 6/1/05 DEL 1140 DEL REY DR Malibu Dr Westcliff Dr E AC C&G 3 2 310 20 6,525 68 64 32 4 1/22/25 AC Overlay (2 in) 11/13/12

Page 3 of 9 ends

City of Stanton, CA
Pavement Condition Index (PCI) Report - All Streets
Sorted by Rank, PCI Order 0-100)
BranchID Sec ID Name From To Rank Surface Type Shoulder Zone Lanes L W True Area PCI % Load % Climate % Other Insp. Date Work History Type Work History Date LAG 1920 LAGUNA CT Westcliff Dr End E AC C&G 3 2 115 20 4,255 69 38 30 32 1/23/25 Slurry Seal 1/31/20 SNTCR 2820 SANTA CRUZ ST Santa Gertrudes Ave Santa Catalina Ave E AC C&G 2 2 1,040 34 36,320 69 50 50 0 12/9/24 Surface Treatment - Slurry Seal 1/31/20 CAR 550 CARLA ST Georgian St Cul-De-Sac E AC C&G 3 2 385 34 14,927 69 82 18 0 1/13/25 Surface Treatment - Slurry Seal 1/31/20 WYA 3540 WYATT RD Cody Dr Cul-De-Sac E AC C&G 6 2 445 34 18,001 69 52 35 13 1/22/25 Slurry Seal or Chip Seal 2/10/09 CARM 580 CARMEL DR Westcliff Dr San Marcos Dr E AC C&G 3 2 285 20 7,409 69 54 28 18 1/22/25 Overlay - AC 3/29/13 CAT 600 CATHERINE AVE Beach Blvd Briarwood St E AC C&G 3 2 650 36 23,075 69 71 11 18 1/21/25 Surface Treatment - Slurry Seal 1/31/20 STARR 3120 STARR ST Fern Ave Vantage St E AC C&G 5 2 210 38 7,531 69 76 24 0 12/12/24 ARHM Overlay (2.0 in) 3/23/10 YAN 3570 YANA DR Chanticleer Rd Cerritos Ave E AC C&G 5 2 810 36 27,021 70 56 44 0 1/14/25 ARHM Overlay (2.0 in) 9/22/09 SNTR 2910 SANTA RITA AVE Santa Cruz Ave Santa Paula Ave E AC C&G 2 2 820 34 28,879 70 61 39 0 1/20/25 Surface Treatment - Slurry Seal 1/31/20 SNTP 2900 SANTA PAULA AVE Santa Rita Ave Stanton Ave E AC C&G 2 2 830 34 28,791 70 51 49 0 1/23/25 New Construction - Initial 2/1/96 GEN 1450 GENTRY WAY Bradford Pl End E AC C&G 1 2 150 30 3,775 71 27 41 32 1/23/25 AC Overlay (2 in) 8/14/12 BEV 360 BEVER PL Beach Blvd End (Private Road) E AC 2 2 630 36 21,598 71 0 23 77 12/9/24 Thin AC Overlay (1.5 in) 8/1/13 ARR 160 ARROWHEAD ST Winterwood Ave City Limit E AC C&G 3 2 1,050 36 38,967 71 80 17 3 1/21/25 Surface Treatment - Slurry Seal 1/31/20 BRA 440 BRAESWOOD WY Aspen Way Sandalwood Way E AC C&G 6 2 315 20 8,340 71 58 32 10 1/22/25 Thin AC Overlay (1.5 in) 8/1/13 FER 1290 FERN ST City Limit (N) Starr St E AC C&G 5 2 350 32 10,685 71 58 42 0 1/13/25 Cold Mill/Overlay 8/14/12 MAS 2300 MASTERSON ST Cody Dr City Limit E AC C&G 6 2 500 34 16,779 71 57 43 0 1/9/25 Slurry Seal or Chip Seal 2/10/09 LAN 1980 LANDERS WAY College Dr End E AC C&G 6 2 125 20 2,740 71 42 58 0 1/22/25 Cold Mill and Overlay - 2 Inches 6/1/15 VAN 3310 VANTAGE ST Lola Ave Winston Rd E AC C&G 5 2 350 36 13,633 72 59 41 0 12/12/24 ARHM Overlay (2.0 in) 3/23/10 COUR 1000 COURT AVE Stanford Ave Acacia Ave E AC C&G 3 2 600 36 22,951 72 73 21 6 1/8/25 Surface Treatment - Slurry Seal 1/31/20 LOL 2100 LOLA AVE MacDuff St Sherrill St E AC C&G 5 2 522 33 17,176 73 70 30 0 1/13/25 Surface Treatment - Slurry Seal 1/31/20 CED 650 CEDAR ST Katella Ave South End E AAC C&G 1 2 590 40 24,750 73 73 27 0 1/14/25 Grind and Overlay (2") 2/1/19 PIN 2570 PINE TREE LN Orangewood Ave End E AC C&G 4 2 1,095 34 36,546 73 0 62 38 12/9/24 ARHM Overlay (2.0 in) 4/1/11 STA 3060 STANDUSTRIAL ST Dale Ave West End E AC C&G 4 2 945 36 34,843 73 77 23 0 12/12/24 Surface Treatment - Slurry Seal 1/31/20 COU 910 COURSON DR Grandoaks Dr Cerritos Ave E AC C&G 7 2 481 34 15,522 73 66 34 0 1/9/25 Surface Treatment - Slurry Seal 6/30/20 FIR 1350 FIRST ST Beach Blvd Cul-De-Sac E AC C&G 6 2 798 34 27,742 74 46 39 15 1/10/25 Slurry Seal or Chip Seal 2/10/09 GRAN 1490 GRANT WAY Custer Way Fulton Way E AC C&G 1 2 395 30 7,481 74 56 38 6 1/28/25 Surface Treatment - Slurry Seal 1/31/20 DRE 1190 DREW WAY College Dr Vassar Way E AC C&G 6 2 280 20 4,829 74 84 16 0 1/22/25 Cold Mill and Overlay - 2 Inches 6/1/15 COL 850 COLLEGE DR Western Ave Emory Way E AC C&G 6 2 575 32 17,477 75 67 33 0 1/20/25 Surface Treatment - Slurry Seal 6/30/20 OAKHAVEN 2410 OAKHAVEN ST Grandoaks Dr Cerritos Ave E AC C&G 7 2 478 34 16,114 75 66 34 0 1/9/25 Surface Treatment - Slurry Seal 6/30/20 FLO 1370 FLOWER ST Main St Pacific St E AC C&G 6 2 538 36 17,732 75 75 25 0 1/10/25 Surface Treatment - Slurry Seal 1/1/21 EWE 1280 EWELL WAY Rutledge Ave Hardee Way E AC C&G 1 2 230 30 6,866 76 0 6 94 1/23/25 Grind and Overlay (2") 1/1/18 PIC 2560 PICKENS LN Jane Way Pine Tree Ln E AC C&G 4 2 225 34 9,148 76 0 53 47 12/9/24 ARHM Overlay (2.0 in) 4/1/11 FIE 1330 FIELDGATE ST Georgian St City Limit (Bently Ave) E AC C&G 3 2 460 34 14,616 76 77 23 0 1/13/25 Slurry Seal 8/1/13 SYL 3180 SYLVAN ST Stardust Lane End E AC C&G 4 2 180 30 5,291 76 32 68 0 1/14/25 Surface Treatment - Slurry Seal 1/31/20 LOL 2090 LOLA AVE Dale Ave MacDuff St E AC C&G 5 2 865 36 29,338 76 58 42 0 1/10/25 Surface Treatment - Slurry Seal 1/31/20 WIN 3500 WINSTON RD Dale Ave Vantage St E AC C&G 5 2 1,025 36 34,187 76 43 56 1 12/12/24 ARHM Overlay (2.0 in) 3/23/10 HIC 1560 HICKOCK ST Cody Dr Cul-De-Sac E AC C&G 6 2 210 34 8,750 76 0 8 92 1/22/25 Surface Treatment - Slurry Seal 6/30/20 GEO 1460 GEORGIAN ST Santa Rosalia Ave Cul-De-Sac E AC C&G 3 2 1,565 34 55,701 77 77 23 0 1/13/25 Surface Treatment - Slurry Seal 1/31/20 HYNE 1620 HYNES Beach Blvd Private Gate E AC C&G 2 2 186 32 6,752 77 6 94 0 12/9/24 ARHM Overlay (2.0 in) 4/18/11 MAI 2240 MAIN ST Chestnut Ave Court Ave E AC C&G 4 2 330 52 16,526 77 72 28 0 1/10/25 New Construction - Initial 1/1/56 SAND 2790 SANDALWOOD WAY Beechwood Way Rose St E AC C&G 6 2 1,195 24 22,436 77 35 32 33 1/22/25 Thin AC Overlay (1.5 in) 8/1/13 HUN 1610 HUNTER WAY College Dr East End E AC C&G 6 2 95 20 1,428 77 0 100 0 1/22/25 Cold Mill and Overlay - 2 Inches 6/1/15 SHA 2980 SHADOW LN Briarwood St Cul-De-Sac E AC C&G 3 2 155 40 7,447 77 51 49 0 1/21/25 ARHM Overlay (2.0 in) 4/1/11 ASH 210 ASHDALE ST Chanticleer Rd Cul-De-Sac E AC C&G 5 2 150 40 6,847 77 42 58 0 1/22/25 ARHM Overlay (2.0 in) 3/23/10 AUG 260 AUGUSTA WAY Marhsall Way End E AC C&G 1 2 86 30 2,195 78 0 100 0 1/23/25 Surface Treatment - Slurry Seal 1/31/20 SNTRO 2930 SANTA ROSALIA AVE Chapman Ave Santa Catalina Ave E AC 2 2 1,245 34 42,180 78 26 70 4 12/9/24 ARHM Overlay (2.0 in) 2/12/13 SON 3040 SONNET ST Lola Ave Winston Rd E AC C&G 5 2 392 36 12,796 78 28 72 0 12/12/24 ARHM Overlay (2.0 in) 3/23/10 BELL 340 BELL ST Cerritos Ave Cul-De-Sac E AC C&G 7 2 1,200 37 45,327 78 46 51 3 1/9/25 Surface Treatment - Slurry Seal 6/30/20 DOG 1160 DOGWOOD WAY Sandalwood Way End E AC C&G 6 2 105 30 2,473 78 18 82 0 1/22/25 Thin AC Overlay (1.5 in) 8/1/13 FIL 1340 FILLMORE ST City Limit (W/ Arthur Dr) Cul-De-Sac E AC C&G 2 2 450 34 17,088 78 37 63 0 12/9/24 Surface Treatment - Slurry Seal 1/31/20 RAM 2610 RAMBLEWOOD DR Palais Rd Cul-De-Sac E AC C&G 7 2 353 34 14,024 78 48 52 0 1/9/25 Surface Treatment - Slurry Seal 6/30/20 FLO 1360 FLOWER ST Cerritos Ave Main St E AC C&G 6 2 590 36 18,941 78 70 30 0 1/10/25 Surface Treatment - Slurry Seal 1/1/21 IND 1650 INDUSTRIAL AVE Western Ave Mercantile Ave E AC C&G 1 2 475 36 19,647 78 34 66 0 1/20/25 Grind and Overlay (2") 2/1/19 DAT 1120 DATE ST Katella Ave Summerwood Ln E AC C&G 6 2 1,000 34 31,917 79 28 72 0 1/9/25 Surface Treatment - Slurry Seal 1/31/20 SNTP 2890 SANTA PAULA AVE Chapman Ave Santa Rita Ave E AC C&G 2 2 370 33 12,776 79 54 46 0 1/20/25 Surface Treatment - Slurry Seal 1/31/20 ROS 2700 ROSE ST Central Ave Monroe Ave E AC C&G 6 2 290 34 10,667 79 24 76 0 1/9/25 Surface Treatment - Slurry Seal 1/31/20 AUB 250 AUBURN WAY Lambert Way Grant Way E AC C&G 1 2 380 30 7,955 79 45 55 0 1/27/25 Surface Treatment - Slurry Seal 1/1/21 JAN 1670 JANE WAY Orangewood Ave Pickens St E AC C&G 4 2 995 34 32,410 79 0 89 11 12/9/24 ARHM Overlay (2.0 in) 4/1/11

Page 4 of 9 ends

City of Stanton, CA
Pavement Condition Index (PCI) Report - All Streets
Sorted by Rank, PCI Order 0-100)
BranchID Sec ID Name From To Rank Surface Type Shoulder Zone Lanes L W True Area PCI % Load % Climate % Other Insp. Date Work History Type Work History Date LAM 1930 LAMBERT WAY Auburn Way Fulton Way E AC C&G 1 2 215 30 6,402 79 56 38 6 1/27/25 Surface Treatment - Slurry Seal 1/31/20 MAI 2245 MAIN ST Sycamore Ave Fern Ave E AC C&G 4 2 310 52 15,460 79 49 51 0 1/10/25 New Construction - Initial 1/1/56 CHES 800 CHESTNUT AVE Central Ave Katella Ave E AC C&G 4 2 262 36 15,174 80 65 28 7 12/9/24 New Construction - Initial 1/1/56 LEX 2050 LEXINGTON DR Granoaks Dr Cerritos Ave E AC C&G 7 2 520 34 17,198 80 65 33 2 1/9/25 Surface Treatment - Slurry Seal 6/30/20 EMO 1260 EMORY WAY College Dr End E AC C&G 6 2 120 20 2,279 80 0 89 11 1/21/25 Cold Mill and Overlay - 2 Inches 6/1/15 MARS 2290 MARSHALL WY Grant Way Bradford Pl E AC C&G 1 2 329 30 7,578 80 9 91 0 1/23/25 Surface Treatment - Slurry Seal 1/31/20 EIL 1220 EILEEN ST Santa Rosalia Stanton Ave E AC C&G 1 2 1,520 33 50,514 80 0 94 6 12/9/24 Surface Treatment - Slurry Seal 1/31/20 SYR 3220 SYRACUSE AVE Western Ave Mitchell Dr E AC C&G 6 2 619 36 22,491 80 29 71 0 1/9/25 Surface Treatment - Slurry Seal 1/31/20 CED 640 CEDAR ST Chester Ave Katella Ave E AC C&G 6 2 255 34 8,889 80 44 56 0 1/9/25 Surface Treatment - Slurry Seal 1/31/20 MIL 2330 MILLS WAY College Dr End E AC C&G 6 2 120 20 1,895 81 23 77 0 1/22/25 Cold Mill and Overlay - 2 Inches 6/1/15 ROS 2690 ROSE ST Chester Ave Central Ave E AC C&G 6 2 280 34 10,588 81 56 44 0 1/9/25 Surface Treatment - Slurry Seal 1/31/20 AUS 270 AUSTIN WAY Cabot Way End E AC C&G 1 2 125 20 2,722 81 0 100 0 1/20/25 Cold Mill/Overlay 4/30/13 RAM 2620 RAMBLEWOOD DR Grandoaks Dr Cul-De-Sac E AC C&G 7 2 406 34 14,811 81 22 78 0 1/9/25 Surface Treatment - Slurry Seal 2/27/25 LAU 1990 LAURELTON AVE Santa Rosalia Ave City Limit (E) E AC C&G 3 2 310 34 10,690 81 49 51 0 1/13/25 Surface Treatment - Slurry Seal 1/31/20 CAB 492 CABOT WY Lambert Way West End E AC C&G 1 2 85 30 1,846 81 0 80 20 1/23/25 Cold Mill/Overlay 4/1/13 MARISA 2270 MARISA ST Georgian St Cul-De-Sac E AC C&G 3 2 190 34 8,321 81 62 38 0 1/13/25 Surface Treatment - Slurry Seal 1/31/20 WES 3430 WESTCHESTER ST Grandoaks Dr Cul-De-Sac E AC C&G 7 2 450 34 16,996 81 0 100 0 1/9/25 Surface Treatment - Slurry Seal 6/30/20 RUTH 2750 RUTHANN AVE Santa Rosalia Ave Stanton Ave E AC C&G 1 2 1,520 33 51,752 81 1 96 3 1/20/25 Surface Treatment - Slurry Seal 1/31/20 PAC 2490 PACIFIC ST Beach Blvd Fern Ave E AC C&G 4 2 1,270 32 46,298 81 0 64 36 12/9/24 New Construction - Initial 1/1/56 PAL 2510 PALAIS RD Western Ave Cul-De-Sac E AC C&G 7 2 880 34 31,100 81 45 55 0 1/9/25 Surface Treatment - Slurry Seal 6/30/20 YAL 3550 YALE WAY Lee Way East End E AC C&G 6 2 185 20 3,891 81 48 52 0 1/21/25 Cold Mill and Overlay - 2 Inches 6/1/15 KATELLA FR 1780 KATELLA FRONTAGE RD Katella Ave (W) Mac St E AC 4 3 760 28 22,088 82 19 68 13 1/28/25 Thin AC Overlay (1.5 in) 8/1/13 SYR 3210 SYRACUSE AVE Knott Ave Lowden St E AC C&G 7 2 1,465 32 46,390 82 50 50 0 1/8/25 Surface Treatment - Slurry Seal 1/31/20 DRA 1180 DRAKE WAY College Dr End E AC C&G 6 2 125 20 1,868 82 16 84 0 1/21/25 Cold Mill and Overlay - 2 Inches 6/1/15 QUE 2590 QUEENS WAY College Dr End E AC C&G 6 2 133 20 1,981 82 15 85 0 1/22/25 Cold Mill and Overlay - 2 Inches 6/1/15 GAR 1430 GARRET RD Syracuse Ave Mitchell Dr E AC C&G 6 2 360 36 12,875 82 18 82 0 1/8/25 Surface Treatment - Slurry Seal 1/31/20 LOWDEN 2140 LOWDEN ST Syracuse Ave Bock Ave E AC C&G 7 2 535 34 17,802 82 14 86 0 1/8/25 ARHM Overlay (1.5 in) 7/12/11 TRI 3270 TRINITY WY College Dr End E AC C&G 6 2 120 20 2,009 82 30 70 0 1/21/25 Cold Mill and Overlay - 2 Inches 6/1/15 CRI 1050 CRIS AVE Magnolia Ave Vinevale St E AC C&G 4 2 545 36 19,443 82 39 61 0 1/13/25 Thin AC Overlay (1.5 in) 8/1/13 MAC 2190 MACDUFF ST Lola Ave North End E AC 5 2 131 33 4,788 82 0 100 0 1/14/25 Grind and Overlay (2") 2/1/19 RUT 2740 RUTGERS WAY College Dr End E AC C&G 6 2 120 20 1,975 82 0 100 0 1/22/25 Cold Mill and Overlay - 2 Inches 6/1/15 DUK 1200 DUKE WAY College Dr End E AC C&G 6 2 120 20 1,637 82 0 100 0 1/22/25 Cold Mill and Overlay - 2 Inches 6/1/15 LOL 2105 LOLA AVE Sherrill St Magnolia Ave E AC C&G 5 2 1,145 33 38,179 82 17 83 0 1/13/25 Surface Treatment - Slurry Seal 1/31/20 WINST 3520 WINSTON ST Kenmore St Magnolia Ave E AC 5 1 260 17 3,995 82 52 48 0 1/13/25 New Construction - AC 1/1/30 CAMU 510 CAMUS LN Lampson Ave Samura Pl E AC C&G 3 2 420 36 15,195 82 16 77 7 1/13/25 Thin AC Overlay (1.5 in) 8/3/13 COU 940 COURSON DR Palais Cul-De-Sac E AC C&G 7 2 162 34 7,213 82 18 82 0 1/9/25 Surface Treatment - Slurry Seal 6/30/20 JOE 1680 JOEL AVE Santa Rosalia Ave Stanton Ave E AC C&G 1 2 1,520 33 50,468 82 14 86 0 1/14/25 Surface Treatment - Slurry Seal 1/31/20 ROS 2680 ROSE ST Katella Ave Chester Ave E AC C&G 6 2 260 34 9,025 82 30 70 0 1/28/25 Surface Treatment - Slurry Seal 1/31/20 WINST 3510 WINSTON ST Sherrill St Cul-De-Sac E AC 5 1 607 17 10,860 82 0 100 0 1/13/25 New Construction - AC 1/1/30 SNTM 2850 SANTA MARIA ST Santa Gertrudes Ave Santa Catalina Ave E AC C&G 2 2 1,040 34 36,052 83 16 84 0 12/9/24 Surface Treatment - Slurry Seal 1/31/20 CEN 668 CENTRAL AVE Flower Ave Beach Blvd E AC C&G 6 2 285 36 10,439 83 31 69 0 1/9/25 Grind and Overlay (2") 2/1/19 COUR 1020 COURT AVE Orangewood Ave Plaza Way E AC C&G 4 2 600 36 14,106 83 0 70 30 12/9/24 Cold Mill/Overlay 8/14/12 GRA 1470 GRANDOAKS DR Lexington St Ramblewood Dr E AC C&G 7 2 1,515 34 52,460 83 18 82 0 1/9/25 Surface Treatment - Slurry Seal 6/30/20 RAM 2660 RAMBLEWOOD DR Syracuse Ave Cul-De-Sac E AC C&G 7 2 119 40 5,812 83 14 86 0 1/8/25 ARHM Overlay (1.5 in) 7/12/11 COUR 980 COURT AVE Main St Pacific St E AC C&G 4 2 545 36 17,627 83 0 60 40 1/10/25 New Construction - Initial 1/1/56 ASP 240 ASPEN WAY Braeswood Way End E AC C&G 6 2 105 20 2,552 83 86 14 0 1/22/25 Thin AC Overlay (1.5 in) 8/1/13 PAC 2480 PACIFIC ST Rose St Beach Blvd E AC C&G 6 2 680 36 21,703 83 50 50 0 3/2/23 Surface Treatment - Slurry Seal 1/31/20 PAL 2520 PALAIS RD Fern Ave Sonnet St E AC C&G 5 2 1,005 36 34,063 83 28 72 0 1/10/25 Surface Treatment - Slurry Seal 1/31/20 BAN 290 BANFF ST Winston Rd Cul-De-Sac E AC C&G 5 2 139 40 6,640 83 0 100 0 12/12/24 ARHM Overlay (2.0 in) 3/23/10 ROS 2710 ROSE ST Monroe Ave North End E AC C&G 6 2 230 34 7,827 83 27 73 0 1/9/25 Surface Treatment - Slurry Seal 1/31/20 SNTG 2840 SANTA GERTRUDES AVE Santa Rosalia Ave Santa Paula Ave E AC C&G 2 2 1,220 32 40,593 83 0 100 0 12/9/24 Thin AC Overlay (1.5 in) 8/1/13 COL 880 COLLEGE DR Landers way Cerritos Ave E AC C&G 6 2 305 32 9,828 83 17 83 0 1/21/25 Surface Treatment - Slurry Seal 6/30/20 CEN 665 CENTRAL AVE Cedar St Flower Ave E AC C&G 6 2 640 36 22,715 84 0 100 0 1/9/25 Grind and Overlay (2") 2/1/19 ROY 2730 ROYAL OAK WAY Evergreen Way Summertree Ln E AC C&G 6 2 235 20 7,062 84 8 14 78 1/22/25 Thin AC Overlay (1.5 in) 8/13/13 SNTRO 2940 SANTA ROSALIA AVE Orangewood Ave Joel Ave E AC C&G 1 2 882 37 32,232 84 0 97 3 12/9/24 Grind and Overlay (2") 2/1/19 VIAI 3340 VIA IRANA Via Jacara Cul-De-Sac E AC C&G 7 2 1,807 37 68,397 84 55 41 4 1/10/25 Surface Treatment - Slurry Seal 4/1/22 SHE 3000 SHERMAN WAY Newton Way North End E AC C&G 1 2 90 30 1,965 84 0 33 67 1/20/25 AC Overlay (2 in) 3/1/13 SYR 3215 SYRACUSE AVE Lowden St Western Ave E AC C&G 7 2 1,205 32 39,151 84 18 82 0 1/8/25 Surface Treatment - Slurry Seal 1/31/20

Page 5 of 9 ends

City of Stanton, CA
Pavement Condition Index (PCI) Report - All Streets
Sorted by Rank, PCI Order 0-100)
BranchID Sec ID Name From To Rank Surface Type Shoulder Zone Lanes L W True Area PCI % Load % Climate % Other Insp. Date Work History Type Work History Date TAM 3230 TAMARACK WAY Sandalwood Way End E AC C&G 6 2 150 30 3,938 84 9 69 22 1/22/25 Thin AC Overlay (1.5 in) 8/1/13 VIL NB 3390 VILLAGE CENTR DR NB City Limit Beach Blvd E AC C&G 3 2 1,320 23 38,742 84 0 33 67 1/21/25 Cold Mill and Overlay 4/30/13 WAB 3410 WABASH WAY Landers Way End E AC C&G 6 2 95 20 1,497 84 0 100 0 1/22/25 Cold Mill and Overlay - 2 Inches 6/1/15 BEE 320 BEECHWOOD WY Sandalwood Way End E AC C&G 6 2 530 20 10,823 84 6 57 37 1/22/25 Thin AC Overlay (1.5 in) 8/1/13 SHER 3010 SHERRILL ST Lola Ave North End E AC 5 2 112 33 3,287 84 0 100 0 1/13/25 Grind and Overlay (2") 2/1/19 YAN 3560 YANA DR Lola Ave Chanticleer Rd E AC C&G 5 2 953 36 31,720 84 2 73 25 1/13/25 ARHM Overlay (2.0 in) 9/22/09 MER 2310 MERCANTILE AVE Industrial Ave Katella Ave E AC C&G 1 2 475 37 16,596 84 49 51 0 1/9/25 Grind and Overlay (2") 2/1/19 TEM 3240 TEMPLE WAY College Dr End E AC C&G 6 2 95 20 1,424 84 0 100 0 1/22/25 Cold Mill and Overlay - 2 Inches 6/1/15 ASH 220 ASHDALE ST Winston Rd Cul-De-Sac E AC C&G 5 2 140 40 6,620 84 0 100 0 12/12/24 Surface Treatment - Slurry Seal 1/31/20 BRIT 470 BRITTANY LN Briarwood St Cul-De-Sac E AC C&G 3 2 370 38 13,923 84 16 84 0 12/9/24 ARHM Overlay (2.0 in) 4/1/11 COL 870 COLLEGE DR Trinity Way Landers Way E AC C&G 6 2 358 32 10,505 84 0 100 0 1/20/25 Surface Treatment - Slurry Seal 6/30/20 KATELLA FR 1782 KATELLA FRONTAGE RD Mac St Katella Ave (E) E AC 4 3 500 28 14,011 84 0 100 0 1/28/25 Thin AC Overlay (1.5 in) 8/1/13 BRAS 420 BRADFORD ST Katella Ave Rutledge Ave E AC C&G 1 2 216 36 8,423 84 33 67 0 1/20/25 AC Overlay (2 in) 8/14/12 SEC 2960 SECOND ST Sentry St Beach Blvd E AAC C&G 6 2 1,100 34 35,471 84 62 38 0 1/10/25 Overlay - AC Structural 1/31/20 VIN 3400 VINEVALE ST Cris Ave Pacific Way E AC C&G 4 2 370 30 15,272 85 19 81 0 1/13/25 Surface Treatment - Slurry Seal 1/31/20 COU 890 COURSON DR Syracuse Ave Cul-De-Sac E AC C&G 7 2 122 40 5,877 85 0 65 35 1/8/25 ARHM Overlay (1.5 in) 7/12/11 SCR 2950 SCRIPPS WAY College Dr Yale Way E AC C&G 6 2 120 20 1,892 85 0 73 27 1/21/25 Cold Mill and Overlay - 2 Inches 6/1/15 DAN 1110 DANA WAY College Dr End E AC C&G 6 2 120 20 1,815 85 0 100 0 1/22/25 Cold Mill and Overlay - 2 Inches 6/1/15 MAI 2242 MAIN ST Court Ave Sycamore Ave E AC C&G 4 2 330 52 16,568 85 22 78 0 1/10/25 New Construction - Initial 1/1/56 OAK 2400 OAK ST Central Ave Cul-De-Sac E AC C&G 6 2 585 34 21,412 85 25 75 0 1/9/25 Surface Treatment - Slurry Seal 1/31/20 CAB 490 CABOT WY Lambert Way Austin Way E AC C&G 1 2 110 30 3,725 85 1 99 0 1/20/25 Cold Mill/Overlay 4/1/13 CEN 660 CENTRAL AVE Date St Cedar St E AC C&G 6 2 636 36 22,530 85 0 100 0 1/9/25 Grind and Overlay (2") 2/1/19 HUN 1600 HUNTER WAY College Dr West End E AC C&G 6 2 95 20 1,632 86 0 100 0 1/22/25 Cold Mill and Overlay - 2 Inches 6/1/15 SNTRO 2945 SANTA ROSALIA AVE Joel Ave North End E AC C&G 1 2 845 37 30,788 86 0 96 4 12/9/24 Grind and Overlay (2") 2/1/19 VIA 3350 VIA JACARA Syracuse Ave Via Irana E AC C&G 7 2 535 37 20,144 86 57 43 0 1/8/25 Surface Treatment - Slurry Seal 4/1/22 COUR 970 COURT AVE Cerritos Ave Main St E AC C&G 4 2 585 36 19,010 86 47 29 24 1/10/25 New Construction - Initial 1/1/56 DAV 1130 DAVMOR AVE Santa Rosalia Stanton Ave E AC C&G 1 2 1,520 33 50,338 86 0 100 0 12/9/24 Grind and Overlay (2") 2/1/19 SNTRO 2935 SANTA ROSALIA AVE Santa Catalina Ave Orangewood Ave E AC 2 2 1,333 34 46,899 86 18 80 2 12/9/24 ARHM Overlay (2.0 in) 2/12/13 CED 620 CEDAR ST Monroe Ave Central Ave E AC C&G 6 2 279 34 9,123 86 0 100 0 1/9/25 Surface Treatment - Slurry Seal 1/31/20 VIAJ 3360 VIA JARDIN Via Kannela Cul-De-Sac E AC C&G 7 2 186 34 8,208 86 30 70 0 1/10/25 Surface Treatment - Slurry Seal 4/1/22 KEE 1790 KEENAN PL Kermore St Cul-De-Sac E AC C&G 7 2 350 40 14,749 86 0 100 0 1/8/25 ARHM Overlay (1.5 in) 7/12/11 PACAVE 2475 PACIFIC AVE Magnolia Ave East City Limits E AC 4 0 100 33 2,658 86 34 66 0 1/28/25 New Construction - Initial 1/1/80 SAM 2770 SAMURA PL Camus Ln Orrway Dr E AC C&G 3 2 250 36 12,804 86 0 100 0 1/13/25 Thin AC Overlay (1.5 in) 8/1/13 BOA 390 BOATMAN AVE Katella Ave Cul-De-Sac E AC C&G 4 2 470 40 21,131 87 0 65 35 12/12/24 New Construction - Initial 1/1/56 LEX 2060 LEXINGTON DR Cerritos Ave South End E AC C&G 7 2 750 32 24,128 87 38 25 37 1/9/25 Surface Treatment - Slurry Seal 6/30/20 VIL SB 3380 VILLAGE CENTER DR SB Beach Blvd City Limit E AC C&G 3 2 1,320 23 35,720 87 13 72 15 1/21/25 Cold Mill/Overlay 4/30/13 STANT 3090 STANTON AVE Ruthann Ave Davmor Ave E AC C&G 1 2 798 29 22,244 87 0 100 0 12/9/24 Grind and Overlay (2") 2/1/19 ORR 2460 ORRWAY DR Lampson Ave Samura Pl E AC C&G 3 2 420 36 15,075 87 0 100 0 1/13/25 Thin AC Overlay (1.5 in) 8/1/13 ASH 200 ASHDALE ST Cerritos Ave Cul-De-Sac (S) E AC C&G 4 2 180 40 8,608 87 28 72 0 1/14/25 Surface Treatment - Slurry Seal 1/31/20 CED 610 CEDAR ST North End Monroe Ave E AC C&G 6 2 272 34 9,031 87 60 33 7 1/9/25 Surface Treatment - Slurry Seal 1/31/20 LOL 2080 LOLA AVE Vantage St Sonnet St E AC C&G 5 2 739 36 26,681 87 22 78 0 12/12/24 Surface Treatment - Slurry Seal 1/31/20 BOC 400 BOCK AVE Lowden St Western Ave E AC C&G 7 2 1,133 34 38,294 87 0 100 0 1/9/25 Surface Treatment - Slurry Seal 1/31/20 AMY 150 AMY AVE Santa Rosalia Ave Cul-De-Sac E AC C&G 3 2 210 34 9,573 87 32 68 0 1/13/25 Surface Treatment - Slurry Seal 1/31/20 COL 860 COLLEGE DR Emory Way Trinity Way E AC C&G 6 2 250 32 8,438 87 0 100 0 1/20/25 Surface Treatment - Slurry Seal 6/30/20 TUL 3290 TULANE WAY College Dr End E AC C&G 6 2 120 20 1,797 88 24 70 6 1/21/25 Cold Mill and Overlay - 2 Inches 6/1/15 ASB 170 ASBURY AVE Syracuse Ave Cul-De-Sac E AC C&G 7 2 140 40 6,534 88 0 96 4 1/8/25 ARHM Overlay (1.5 in) 7/12/11 BLU 380 BLUE SPRUCE WY Summertree Ln End E AC AB 6 2 170 20 3,861 88 0 32 68 1/22/25 Thin AC Overlay (1.5 in) 8/1/13 BRA 430 BRAESWOOD WY Summertree Ln Aspen Way E AC C&G 6 2 105 20 2,633 88 0 50 50 1/22/25 Thin AC Overlay (1.5 in) 8/1/13 ELD 1230 ELDER WAY Juniper Way End E AC C&G 6 2 95 20 2,264 88 0 57 43 1/22/25 Thin AC Overlay (1.5 in) 8/1/13 CHES 810 CHESTNUT AVE Monroe Ave Cul-De-Sac E AC C&G 4 2 270 36 10,818 88 20 80 0 12/12/24 New Construction - Initial 1/1/56 KER 1850 KERMORE LN Knott Ave Via Jacara E AC C&G 7 2 116 37 4,262 89 38 62 0 1/8/25 Surface Treatment - Slurry Seal 4/1/22 VIAK 3370 VIA KANNELA Via Jacara Cul-De-Sac E AC C&G 7 2 837 34 30,799 89 0 83 17 1/10/25 Surface Treatment - Slurry Seal 4/1/22 SYC 3150 SYCAMORE AVE Main St Pacific St E AC C&G 4 2 465 36 21,138 89 0 100 0 1/10/25 New Construction - Initial 1/1/56 CEN 670 CENTRAL AVE Beach Blvd Chestnut Ave E AC C&G 4 2 270 25 7,009 89 57 1 42 1/10/25 New Construction - Initial 1/1/56 CHE 795 CHESTER AVE Chestnut Ave Court Ave E AC C&G 4 2 295 36 10,453 89 23 77 0 12/9/24 New Construction - Initial 1/1/56 CHE 790 CHESTER AVE Beach Blvd Chestnut Ave E AC C&G 4 2 230 35 8,118 90 0 100 0 12/9/24 New Construction - Initial 1/1/56 KER 1870 KERMORE LN Keenan Pl Lowden St E AC 7 2 220 33 7,274 90 0 100 0 1/8/25 New Construction - AC 1/1/30 KER 1860 KERMORE LN Knott Ave Keenan Pl E AC 7 2 1,160 45 47,437 90 0 63 37 1/8/25 Micro Surfacing 1/1/17

Page 6 of 9 ends

City of Stanton, CA
Pavement Condition Index (PCI) Report - All Streets
Sorted by Rank, PCI Order 0-100)
BranchID Sec ID Name From To Rank Surface Type Shoulder Zone Lanes L W True Area PCI % Load % Climate % Other Insp. Date Work History Type Work History Date LUL 2180 LULLABY LN Lexington Dr Cul-De-Sac E AC C&G 7 2 417 34 15,534 91 0 100 0 1/9/25 Surface Treatment - Slurry Seal 6/30/20 SYR 3200 SYRACUSE AVE Knott Ave Via Jacara E AC C&G 7 2 160 37 5,024 91 0 100 0 1/8/25 Surface Treatment - Slurry Seal 4/1/22 CARL 570 CARLTON WY Bradford Pl End E AC C&G 1 2 190 30 4,253 91 0 48 52 1/20/25 AC Overlay (2 in) 3/1/13 HAM 1510 HAMDEN AVE Syracuse Ave Cul-De-Sac (N) E AC C&G 7 2 275 34 10,911 91 0 100 0 1/8/25 ARHM Overlay (1.5 in) 7/12/11 MIT 2340 MITCHELL DR Garret Rd Syracuse Ave E AAC C&G 6 2 620 36 25,086 91 0 100 0 1/9/25 Overlay - AC Structural 1/31/20 PEP 2550 PEPPERTREE LN Beechwood Way Cerritos Ave E AC C&G 6 2 100 40 4,446 91 0 87 13 1/22/25 Thin AC Overlay (1.5 in) 8/1/13 HAM 1520 HAMDEN AVE Syracuse Ave Cul-De-Sac (S) E AC C&G 7 2 78 40 4,716 92 0 100 0 1/8/25 New Construction - Initial 7/1/59 EAT 1210 EATON WAY Rutledge Ave End E AC C&G 1 2 160 30 3,877 92 0 35 65 1/20/25 Grind and Overlay (2") 1/1/18 MARR 2280 MARRYAT WAY Bradford Pl End E AC C&G 1 2 70 30 1,927 92 0 0 100 1/20/25 Cold Mill and Overlay 1/31/20 JUN 1690 JUNIPER WY Beechwood Way Elder Way E AC C&G 6 2 115 30 3,044 92 0 61 39 1/22/25 Thin AC Overlay (1.5 in) 8/1/13 RUTL 2765 RUTLEDGE AVE Fulton Way Bradford Pl E AC C&G 1 2 560 32 19,889 93 17 83 0 1/20/25 Grind and Overlay (2") 1/1/18 CED 630 CEDAR ST Central Ave Chester Ave E AAC C&G 6 2 283 34 10,436 93 0 100 0 1/9/25 Overlay - AC Structural 1/31/20 RUTL 2762 RUTLEDGE AVE Dover Pl Fulton Way E AC C&G 1 2 650 36 22,846 93 0 100 0 1/20/25 Grind and Overlay (2") 1/1/18 SYC 3140 SYCAMORE AVE Cerritos Ave Main St E AC C&G 4 2 590 36 21,302 93 0 88 12 1/10/25 New Construction - Initial 1/1/56 BAT 310 BATES WY College Dr End E AC C&G 6 2 120 40 1,846 93 0 100 0 1/20/25 Cold Mill and Overlay - 2 Inches 6/1/15 NEWTON 2380 NEWTON WY Carlton Way Bradford Pl E AC C&G 1 2 340 30 7,945 94 0 56 44 1/20/25 AC Overlay (2 in) 3/1/13 THU 3250 THUNDERBIRD LN Lowden St Western Ave E AC C&G 7 2 1,215 34 41,223 94 0 100 0 12/12/24 Reconstruct Structure (AC) 6/1/17 SHE 2990 SHERMAN WAY Newton Way South End E AC C&G 1 2 105 30 2,252 94 0 100 0 1/20/25 New Construction - Initial 6/1/05 RUTL 2760 RUTLEDGE AVE Western Ave Dover Pl E AC C&G 1 2 760 36 27,559 94 0 100 0 1/20/25 Grind and Overlay (2") 1/1/18 EVE 1270 EVERGREEN WAY Summertree Ln Royal Oak Way E AC C&G 6 2 120 20 2,631 94 0 100 0 1/22/25 Thin AC Overlay (1.5 in) 8/1/13 SUM 3130 SUMMERTREE LN Cerritos Ave Braeswood Way E AC C&G 6 2 455 34 13,452 95 0 100 0 1/22/25 Thin AC Overlay (1.5 in) 8/1/13 OWE 2470 OWEN WAY College Dr End E AC C&G 6 2 85 20 1,299 95 0 100 0 1/21/25 Cold Mill and Overlay - 2 Inches 6/1/15 KIR 1880 KIRBY WY Hardee Way Hood Way E AC C&G 1 2 450 25 9,596 96 0 35 65 1/20/25 Grind and Overlay (2") 1/1/18 PUR 2580 PURDUE WAY College Dr End E AC C&G 6 2 95 20 1,434 96 0 100 0 1/22/25 Mill, Overlay w/Fabric (1.5 in) 3/1/19 CARR 590 CARROTWOOD WY Beechwood Way Blue Spruce Way E AC C&G 6 2 155 20 3,629 98 0 100 0 1/22/25 Thin AC Overlay (1.5 in) 8/1/13 ASC 190 ASCOT WAY Radcliff Way Camden Way E AC C&G 1 2 240 25 4,630 99 0 100 0 1/20/25 Grind and Overlay (2") 1/1/18 BEL 330 BELGRAVE AVE Santa Rosalia Ave City Limit E AAC C&G 3 2 310 34 10,827 99 0 100 0 1/13/25 Overlay - AC Structural 1/31/20 CAM 500 CAMDEN WY Ascot Way Rutledge Ave E AC C&G 1 2 430 30 11,430 99 0 100 0 1/20/25 Grind and Overlay (2") 1/1/18 DOV 1170 DOVER WAY Rutledge Ave Windmere Way E AC C&G 1 2 220 30 5,865 99 0 100 0 1/20/25 Grind and Overlay (2") 1/1/18 HAR 1540 HARDEE WAY Ewell Way Kirby Way E AC C&G 1 2 260 20 5,802 99 0 100 0 1/20/25 Grind and Overlay (2") 1/1/18 HOO 1570 HOOD WAY Kirby Way Rutledge Ave E AC C&G 1 2 205 30 6,120 99 0 100 0 1/20/25 Grind and Overlay (2") 1/1/18 KEN 1810 KENMORE ST Kennelly Ln Winston St E AC C&G 5 2 250 34 9,111 99 0 100 0 1/13/25 Complete Reconstruction - AC 1/31/20 KENN 1830 KENNELLY LN Sherrill St Cul-De-Sac E AC C&G 5 2 1,095 34 37,725 99 0 100 0 1/13/25 Complete Reconstruction - AC 1/31/20 RAD 2600 RADCLIFF WAY Rutledge Ave Ascot Way E AC C&G 1 2 245 30 6,553 99 0 100 0 1/20/25 Grind and Overlay (2") 1/1/18 ROX 2720 ROXBURY WAY Rutledge Ave End E AC C&G 1 2 170 30 4,139 99 0 100 0 1/20/25 Grind and Overlay (2") 1/1/18 SHER 3020 SHERRILL ST Lola Ave Winston St E AC 5 2 497 34 17,188 99 0 100 0 1/13/25 Complete Reconstruction - AC 1/31/21 WIND 3490 WINDMERE WY Dover Way Rutledge Ave E AC C&G 1 2 650 30 13,216 99 0 100 0 1/20/25 Grind and Overlay (2") 1/1/18 KENT 1840 KENT WY Dover Way End E AC C&G 1 2 80 30 1,984 99 0 100 0 1/20/25 Grind and Overlay (2") 1/1/18 ALE 20 ALE LN Lessue Ave Cul-De-Sac E AC C&G 2 2 188 33 8,177 100 0 0 0 2/27/25 Overlay - AC Structural 2/27/25 ALE 30 ALE LN Ruthann Ave Cul-De-Sac E AC 1 2 127 70 7,034 100 0 0 0 2/27/25 Overlay - AC Structural 2/27/25 BAN 300 BANFF ST Chanticleer Rd Cul-De-Sac E AC C&G 5 2 160 40 7,564 100 0 0 0 2/27/25 Overlay - AC Structural 2/27/25 CAP 520 CAPISTRANO DR Briarwood St Malibu Dr E AC C&G 3 2 615 20 12,143 100 0 0 0 2/27/25 Overlay - AC Structural 2/27/25 CARD 530 CARDIFF DR San Marcos Dr Westcliff Dr E AC C&G 3 2 380 20 7,093 100 0 0 0 2/27/25 Overlay - AC Structural 2/27/25 CARI 540 CARIE LN Western Ave Cul-De-Sac E AC C&G 1 2 352 34 13,717 100 0 0 0 2/27/25 Overlay - AC Structural 2/27/25 COURT 1030 COURTRIGHT RD Cody Dr South End E AAC C&G 6 2 247 34 8,632 100 0 0 0 1/9/25 Overlay - AC Structural 11/4/24 DEV 1150 DEVONWOOD AVE Santa Rosalia Ave Fieldgate St E AAC C&G 3 2 805 34 27,523 100 0 0 0 1/13/25 Overlay - AC Structural 11/4/24 FER 1310 FERN ST Cerritos Ave Pacific St E AC C&G 4 2 1,110 36 40,875 100 0 0 0 2/27/25 Overlay - AC Structural 2/27/25 FER 1320 FERN ST Stanford Ave (SB Only) Acacia Ave (SB Only) E AC C&G 3 1 650 18 11,987 100 0 0 0 1/8/25 New Construction - Initial 4/30/13 FER 1325 FERN ST Acacia Ave (SB Only) Garden Grove Blvd (SB Only) E AC C&G 3 1 635 18 10,926 100 0 0 0 1/8/25 New Construction - Initial 4/30/13 FLO 1380 FLOWER ST Monroe Ave Central Ave E AC C&G 6 2 276 34 10,365 100 0 0 0 2/27/25 Overlay - AC Structural 2/27/25 FLO 1390 FLOWER ST Central Ave Chester Ave E AC C&G 6 2 285 34 10,495 100 0 0 0 2/27/25 Overlay - AC Structural 2/27/25 FLO 1400 FLOWER ST Chester Ave Katella Ave E AC C&G 6 2 265 34 8,850 100 0 0 0 2/27/25 Overlay - AC Structural 2/27/25 FUL 1410 FULTON WY Rutledge Way Trojan Way E AAC C&G 1 2 240 26 5,912 100 0 0 0 1/20/25 Overlay - AC Structural 11/1/24 FUL 1412 FULTON WY Trojan Way Emerson Way E AAC C&G 1 2 330 26 6,678 100 0 0 0 1/20/25 Overlay - AC Structural 11/4/24 FUL 1414 FULTON WY Emerson Way Grant Way E AAC C&G 1 2 590 26 14,503 100 0 0 0 1/20/25 Overlay - AC Structural 11/4/24 FUL 1415 FULTON WY Grant Way Lambert Way E AAC C&G 1 2 430 28 11,272 100 0 0 0 1/20/25 Overlay - AC Structural 11/4/24 FUL 1416 FULTON WY Lambert Way End E AAC C&G 1 2 100 25 2,111 100 0 0 0 1/20/25 Overlay - AC Structural 11/4/24 GRAN 1480 GRANT WAY Marshall Way Custer Way E AC C&G 1 2 200 30 4,674 100 0 0 0 2/27/25 Overlay - AC Structural 2/27/25

Page 7 of 9 ends

City of Stanton, CA
Pavement Condition Index (PCI) Report - All Streets
Sorted by Rank, PCI Order 0-100)
BranchID Sec ID Name From To Rank Surface Type Shoulder Zone Lanes L W True Area PCI % Load % Climate % Other Insp. Date Work History Type Work History Date LAM 1950 LAMBERT WAY Longford Way Hampton Way E AC C&G 1 2 400 30 8,943 100 0 0 0 2/27/25 Overlay - AC Structural 2/27/25 LON 2110 LONGFORD WAY Knott Ave Lambert Way E AC C&G 1 2 120 30 4,360 100 0 0 0 2/27/25 Overlay - AC Structural 2/27/25 LON 2120 LONGFORD WAY Lambert Way End E AC C&G 1 2 340 25 10,331 100 0 0 0 2/27/25 Overlay - AC Structural 2/27/25 MARIO 2260 MARIO AVE Ruthann Ave Cul-De-Sac E AC C&G 1 2 209 33 9,044 100 0 0 0 2/27/25 Overlay - AC Structural 2/27/25 MON 2360 MONROE AVE Oak St Rose St E AC 6 2 626 33 20,728 100 0 0 0 2/27/25 Overlay - AC Structural 2/27/25 MON 2365 MONROE AVE Rose St Flower Ave E AC 6 2 305 33 9,804 100 0 0 0 2/27/25 Overlay - AC Structural 2/27/25 SNTCR 2830 SANTA CRUZ ST Lessue Ave Cul-De-Sac E AC C&G 2 2 188 34 8,081 100 0 0 0 2/27/25 Overlay - AC Structural 2/27/25 SNTM 2860 SANTA MARIA ST Ruthann Ave Cul-De-Sac E AC C&G 1 2 308 33 12,234 100 0 0 0 2/27/25 Overlay - AC Structural 2/27/25 SNTM 2870 SANTA MARIA ST Lessue Ave Cul-De-Sac E AC C&G 2 2 188 34 8,187 100 0 0 0 2/27/25 Overlay - AC Structural 2/27/25 SYL 3190 SYLVAN ST Cerritos Ave End E AC C&G 4 2 285 30 9,257 100 0 0 0 2/27/25 Overlay - AC Structural 2/27/25

32.7 5,754,386
Alleys
ALYFB 85 Alley b/w Flower and Beach Main St End AC O AC 6 1 315 20 6,300 8 52 30 18 4/7/23 New Construction - Initial 1/1/56 ALYFB 80 Alley b/w Flower and Beach Cerritos Ave Main St O AC 6 1 580 20 11,600 18 63 32 5 4/7/23 New Construction - Initial 1/1/56 ALCLU 3696 Alley b/w Lullaby and Cerritos Yana Dr East End O AC 5 1 550 20 11,000 22 54 37 9 4/14/23 New Construction - Initial 1/1/80 ALORLE 3622 Alley b/w Orangewood and Lessue Lenmar St East End O AC 2 1 245 20 4,900 22 47 53 0 4/14/23 New Construction - Initial 1/1/80 ALWM 3625 Alley b/w Katella and Industrial Western Ave Mercantile Ave O AC 1 1 470 20 9,400 23 56 38 6 4/14/23 New Construction - Initial 1/1/80 ALYTP 130 Alley b/w Tina and Pacific Sherrill St Magnolia Ave O AC 4 1 1,116 20 22,320 36 68 27 5 3/1/23 New Construction - Initial 6/1/93 ALESNT 3700 Alley e/ Sentry Dr 2nd St North End O AC 6 1 215 25 5,375 38 52 48 0 4/14/23 New Construction - Initial 1/1/80 ALBCO 3605 Alley b/w Camus Ln and Orrway Dr Lampson Ave Samura Pl O AC 3 1 375 20 7,500 39 65 34 1 4/14/23 New Construction - Initial 1/1/80 ALCLU 3695 Alley b/w Lullaby and Cerritos Yana Dr West End O AC 5 1 120 20 2,400 40 52 38 10 4/14/23 New Construction - Initial 1/1/80 ALEARR 3615 Alley e/ Arrowhead St Arrowhead St Arrowhead St O AC 3 1 895 20 17,900 40 38 54 8 4/14/23 New Construction - Initial 1/1/80 ALCHCT 3672 Alley b/w Chestnut and Court Begin AC 115' N/ Main St Main St O AC 4 1 100 15 1,500 42 16 58 26 4/14/23 New Construction - Initial 1/1/80 ALDTOK 3630 Alley b/w Date and Oak Summerwood Ln Central Ave O AC 6 1 300 15 4,500 42 3 97 0 4/14/23 New Construction - Initial 1/1/80 ALBCH 3660 Alley b/w Beach and Chestnut Chester Ave Katella Ave O AC 4 1 235 15 3,525 43 30 61 9 4/14/23 New Construction - Initial 1/1/80 ALBCH 3664 Alley b/w Beach and Chestnut Main St Pacific St O AC 4 1 540 15 8,100 46 43 49 8 4/14/23 New Construction - Initial 1/1/80 ALBCH 3662 Alley b/w Beach and Chestnut Cerritos Ave Main St O AC 4 1 585 15 8,775 48 78 21 1 4/14/23 New Construction - Initial 1/1/80 ALCHCT 3675 Alley b/w Chestnut and Court Main St End AC 140' S/ Main St O AC 4 1 140 20 2,800 53 14 85 1 4/14/23 New Construction - Initial 1/1/80 ALYCS 40 Alley b/w Court and Sycamore Cerritos Ave End AC O AC 4 1 80 20 1,600 53 26 74 0 3/22/23 New Construction - Initial 1/1/80 ALYVM 90 Alley b/w Magnolia and Vinevale Cris Ave Pacific Ave O AC 4 1 353 20 7,060 53 38 60 2 4/10/23 New Construction - Initial 7/1/60 ALOKCD 3638 Alley b/w Oak and Cedar Chester Ave Katella Ave O AC 6 1 240 15 3,600 53 32 38 30 4/14/23 New Construction - Initial 1/1/80 ALCHCT 3670 Alley b/w Chestnut and Court Cerritos Ave End PCC 115' N/ Main St O PCC 4 1 480 15 7,200 56 55 13 32 4/14/23 New Construction - Initial 1/1/80 ALOKCD 3636 Alley b/w Oak and Cedar Monroe Ave Central Ave O AC 6 1 270 15 4,050 56 56 40 4 4/14/23 New Construction - Initial 1/1/80 ALCHCT 3674 Alley b/w Chestnut and Court Chestnut Ave Alley 3670 O PCC 4 1 125 15 1,875 57 93 7 0 4/14/23 New Construction - Initial 1/1/80 ALDTOK 3632 Alley b/w Date and Oak Central Ave Katella Ave O AC 6 1 575 14 8,050 57 49 48 3 4/14/23 New Construction - Initial 1/1/80 ALCDRS 3640 Alley b/w Cedar and Rose North End Monroe Ave O PCC 6 1 275 15 4,125 58 46 10 44 4/14/23 New Construction - Initial 1/1/80 ALYFB 3655 Alley b/w Flower and Beach Central Ave Chester Ave O PCC 6 1 270 15 4,050 60 57 5 38 4/14/23 New Construction - Initial 1/1/80 ALYRF 115 Alley b/w Rose and Flower Main St Pacific St O PCC 6 1 400 20 8,000 61 60 15 25 4/7/23 New Construction - Initial 1/1/56 ALYCS 42 Alley b/w Court and Sycamore Begin PCC (S/ Cerritos Ave) Main St O PCC 4 1 505 20 10,100 62 70 18 12 3/22/23 New Construction - Initial 1/1/56 ALPB 3690 Alley s/ Pacific and w/ Beach Pacific Ave Beach Blvd O AC 4 1 930 20 18,600 62 46 54 0 4/14/23 New Construction - Initial 1/1/80 ALYCP 50 Alley b/w Criss Ave and Pacific Ave Alley b/w Magnolia and Vinevale Vinevale St O AC 4 1 322 20 6,440 63 52 48 0 4/10/23 New Construction - Initial 7/1/60 ALYFB 3656 Alley b/w Flower and Beach Chester Ave Katella Ave O PCC 6 1 240 15 3,600 64 70 22 8 4/14/23 New Construction - Initial 1/1/80 ALOKCD 3635 Alley b/w Oak and Cedar North End Monroe Ave O AC 6 1 275 15 4,125 64 16 25 59 4/14/23 New Construction - Initial 1/1/80 ALYRF 3650 Alley b/w Rose and Flower Central Ave Chester Ave O PCC 6 1 270 15 4,050 65 64 20 16 4/14/23 New Construction - Initial 1/1/80 ALCDRS 3645 Alley b/w Cedar and Rose Chester Ave Katella Ave O PCC 6 1 240 15 3,600 68 28 32 40 4/14/23 New Construction - Initial 1/1/80 ALCHCT 3678 Alley b/w Chestnut and Court Chestnut Ave Alley 3675 O AC 4 1 130 15 1,950 68 12 88 0 4/14/23 New Construction - Initial 1/1/80 ALYRF 3652 Alley b/w Rose and Flower Chester Ave Katella Ave O PCC 6 1 240 15 3,600 69 42 21 37 4/14/23 New Construction - Initial 1/1/80 ALCHCT 3676 Alley b/w Chestnut and Court Begin PCC 140' S/ Main St Chestnut Ave O PCC 4 1 400 20 8,000 71 33 17 50 4/14/23 New Construction - Initial 1/1/80 ALYRF 110 Alley b/w Rose and Flower Cerritos Ave Main St O PCC 6 1 590 20 11,800 71 61 31 8 4/7/23 New Construction - Initial 1/1/56 ALSYF 3685 Alley b/w Sycamore and Fern Main St Pacific St O PCC 4 1 445 15 6,675 72 76 16 8 4/14/23 New Construction - Initial 1/1/80 ALWYS 3698 Alley b/w Wyatt and Sentry Cody Dr North End O AC 6 1 370 20 7,400 72 50 48 2 4/14/23 New Construction - Initial 1/1/80 ALCDRS 3644 Alley b/w Cedar and Rose Central Ave Chester Ave O PCC 6 1 275 15 4,125 73 58 24 18 4/14/23 New Construction - Initial 1/1/80 ALYDO 70 Alley b/w Davmor and Orangewood Santa Rosalia St Lenmar St O AC 1 1 1,199 20 23,980 73 35 62 3 3/18/23 New Construction - Initial 1/1/97 ALYDO 75 Alley b/w Davmor and Orangewood Lenmar St East End O AC 1 1 310 20 6,200 73 26 72 2 3/18/23 New Construction - Initial 1/1/97 ALSYF 3680 Alley b/w Sycamore and Fern Cerritos Ave Main St O PCC 4 1 580 15 8,700 73 58 10 32 4/14/23 New Construction - Initial 1/1/80 ALYCS 45 Alley b/w Court and Sycamore Main St Pacific St O PCC 4 1 445 20 8,900 74 52 24 24 3/22/23 New Construction - Initial 1/1/56 ALOKCD 3637 Alley b/w Oak and Cedar Central Ave Chester Ave O AC 6 1 270 15 4,050 77 48 52 0 4/14/23 New Construction - Initial 1/1/80 ALYFB 86 Alley b/w Flower and Beach Begin PCC (S/ Main St) Pacific St O PCC 6 1 225 20 4,500 79 73 27 0 4/7/23 New Construction - Initial 1/1/80

Page 8 of 9 ends

City of Stanton, CA
Pavement Condition Index (PCI) Report - All Streets
Sorted by Rank, PCI Order 0-100)
BranchID Sec ID Name From To Rank Surface Type Shoulder Zone Lanes L W True Area PCI % Load % Climate % Other Insp. Date Work History Type Work History Date ALYS 140 Alley s/ Cerritos and e/ of Sylvan Cerritos Ave (W) Sylvan St O AC 4 1 410 20 8,200 83 47 8 45 4/10/23 Reconstruct Structure (AC) 2/1/19 ALCDRS 3642 Alley b/w Cedar and Rose Monroe Ave Central Ave O PCC 6 1 270 15 4,050 84 59 33 8 4/17/23 Complete Reconstruction - PCC 1/1/00 ALBCH 3665 Alley b/w Beach and Chestnut Alley 3664 Chestnut Ave O PCC 4 1 120 15 1,800 86 0 20 80 4/14/23 New Construction - Initial 1/1/80 ALYWIN 120 Alley b/w Sonnet and Dale Winston Rd End O AC 5 1 496 20 9,920 94 0 100 0 3/1/23 New Construction - AC 2/1/19 ALWCL 3600 Alley w/ Camus Ln and s/ Lampson Av Camus Ln Gate O AC 3 1 430 20 8,600 94 0 88 12 4/14/23 New Construction - Initial 1/1/80 ALEORR 3610 Alley e/ Orrway and s/ Lampson Orrway Dr Gate O AC 3 1 430 20 8,600 95 0 100 0 4/14/23 New Construction - Initial 1/1/80 ALYS 142 Alley s/ Cerritos and e/ of Sylvan Sylvan St Cerritos Ave (E) O AC 4 1 410 20 8,200 95 0 87 13 4/10/23 Reconstruct Structure (AC) 2/1/19 ALYPAL 100 Alley b/w Ramblewood and Western Palais Rd Western Ave O PCC 7 1 598 18 10,764 98 0 100 0 3/2/23 Complete Reconstruction - PCC 1/1/18 ALYDY 60 Alley b/w Dale Ave and Yana Dr Lola Ave Chanticleer Rd O AC 5 1 980 20 18,620 100 0 0 0 2/27/25 Overlay - AC Structural 2/27/25 ALORLE 3620 Alley b/w Orangewood and Lessue Santa Rosalia St Lenmar St O AC 2 1 1,195 20 23,900 100 0 0 0 2/27/25 Overlay - AC Structural 2/27/25

4.4 430,554

Page 9 of 9 ends

City of Stanton, CA Page 16
2025 Citywide Pavement Management Plan – OCTA Submittal Final Report – March 13, 2025
XIII. APPENDIX C – GIS DIGITAL DATA
Introduction
The OCTA GIS Section maintains a spatial inventory of transportation infrastructure which mostly consists of major arterial streets, roads, and highways. A key component of road information is pavement condition. Maintaining an inventory of pavement condition will enhance OCTA’s GIS visualization and analysis capabilities and assist in understanding the transportation investment needs throughout the region. Therefore, a GIS dataset in digital format should be included in this report.

Structure of GIS Data
The GIS dataset must consist of linear geographic features that represent road/street segments. All segments that are part of the report should be included in the GIS dataset. The attribute information of each segment should generally follow the format of the Complete Listing of Current Street Conditions in Appendix B above.

The GIS data requirements are discussed below. Most commercial and open-source GIS software provide industry-standard tools to manage GIS data to meet these requirements.

GIS Digital Data Format
The GIS data must be submitted in either one of the following formats:
• Esri Shapefile, or
• Esri File Geodatabase
Metadata
The GIS data are required to have associated metadata. The minimum metadata items required are:
• Title of Dataset
• Tags (A set of words that can be used by GIS to search for the resource. For example: “pavement”, “transportation”, “roads”)
• Summary (A brief purpose statement of the dataset)
• Description (A brief narrative of the dataset’s content) • Credits (A recognition of those who created or contributed to the resource) Spatial Geometry Type
The spatial geometry of the segment features must be lines that represent the roadway centerline as accurately as possible.

Projection
The GIS data must have spatial reference information and have its coordinate system identified and City of Stanton, CA Page 17
2025 Citywide Pavement Management Plan – OCTA Submittal Final Report – March 13, 2025
embedded in or associated with the data file(s). All GIS data submitted to OCTA should be in the following projected coordinate system:
• NAD 1983 State Plane California VI FIPS 0406 (US Feet) - More information about this system can be found at: https://spatialreference.org/ref/epsg/nad83-california-zone-6-ftus/ GIS Feature Attributes
The required segment attributes are:
• Street name
• Unique segment identifier (Segment ID from original source if available) • Name of intersecting road at the beginning of a segment • Name of intersecting road at the end of the segment
• Current pavement condition index (PCI)
• Current PCI inspection date
• Length of road segment in feet
• Width of road segment in feet
• Paved area of road segment in square feet or square yards • Projected PCI at end of Seven-Year Road Maintenance and Rehabilitation Plan Additional attributes such as number of through travel lanes, direction of travel and pavement surface type may be provided.

XIV. APPENDIX D – QUALITY ASSURANCE / QUALITY CONTROL PLAN Introduction
When performing data collection in any field, the need for quality control is paramount as it is essential for accurate planning, analysis and design. This is particularly true for collecting pavement distress data for a pavement management program.

The Quality Assurance / Quality Control (QA/QC) Plan establishes minimum quality standards for performance and procedures for update of the pavement management program.

Objectives
This document constitutes a formal QA/QC Plan for the City of Stanton. It was prepared on March, 2018 and last revised in January, 2025.

Specifically, it is intended for the 2025 Pavement Management Plan Update. The focus is on the collection of network-level pavement distress data (defined by National Cooperative Highway Research Program (NCHRP) Synthesis 401 Quality Management of Pavement Data Collection, as “Network-level data collection involves collection of large quantities of pavement condition data, which is often converted to individual condition indices or aggregated into composite condition indices”.

This document also addresses the QA/QC plan requirements of the Orange County Transportation City of Stanton, CA Page 18
2025 Citywide Pavement Management Plan – OCTA Submittal Final Report – March 13, 2025
Authority (OCTA)’s “Countywide Pavement Management Plan Guidelines” (Section 2.4), adopted in May 2010.

Structure of QA/QC Plan
The following components are addressed in this QA/QC Plan:
• Condition survey procedures used;
• Accuracy required for data collection;
• Inspector qualifications and experience; and
• Safety.

Condition Survey Procedures
The governing document in performing condition surveys for the City of Stanton is ASTM D6433 “Standard Practice for Roads and Parking Lots Pavement Condition Index (PCI) Surveys.” Both asphalt concrete (AC) and Portland cement concrete (PCC) pavements are included in this protocol. The following distresses are collected for each pavement type:

As required by the Orange County Transportation Authority (OCTA), the City of Stanton must prepare and implement a quality assurance / quality control (QA/QC) plan regarding pavement management inspection as they pertain to MicroPAVER. For the purposes of this report, Bucknam has demonstrated below how our project team implemented QA/QC procedures during the project.

City of Stanton, CA Page 19
2025 Citywide Pavement Management Plan – OCTA Submittal Final Report – March 13, 2025
Our QA/QC plan focuses on the how each pavement inspection is performed, what distresses are collected and ensures that it complies with the OCTA guidelines defined within the “Countywide Pavement Management Plan Guidelines (CPMPG)”.

As shown within the OCTA (CPMPG), our staff followed and delivered on the requirements stated within Chapter 2, page 2-5 which require specific QA/QC data (Items A through G). Additionally, Chapter 3 requires numerous data/deliverables from local agencies for OC Go eligibility. All general PCI budgetary report submittals will follow the Chapter 3 guidelines.

In conjunction with the outlined items within the CPMPG Section 2 we have summarized our QA/QC procedures below:
a. Descriptions of condition survey - Our staff follows the required Condition Survey Protocols (CPMPG, Chapter 2); our staff assesses each pavement section for the minimum distresses outlined within Chapter 2, page 2-1. Additionally, based on the pavement conditions found, we collect all MicroPAVER/StreetSaver Army Corps of Engineers (USACE) distresses, if found within the sample sections; for example, if slippage cracking, potholes, etc. are found our survey technicians record the proper information.
b. How data was collected - Our surveys follow the OCTA accepted walking requirements. All sections that our staff surveys are performed through the walking method, approximately 10% of all sections surveyed were complemented with windshield surveys based on unique conditions found. Our staff physically measures the width of every section as well as measure for any square footage adjustment that need to be added or taken away from a sections “true area” (i.e. cul-desac, bus pads, street width variances, etc.). Samples taken always include a minimum of 2,500 SF coverage unless specific section limits prohibit this. Arterial section samples utilize a 3,500 SF sample size due to the larger section area (this is within the ASTM D6433 sample size calculation.

Field crews typically include one individual for residential pavement sections while Arterial (MPAH) routes utilize a two-person crew for safety, traffic control and increases quality control. c. Accuracy required for data collection - We use a statistical sampling approach for measuring the quality of our field technician’s work. In this manner, 10 percent of the original surveys are resurveyed by a different survey crew than the original, supervised by a field supervisor, and the results are compared to the original surveys. Our QC process involves checking the field crews’ work in a “blind study” fashion. Quality control checks are performed at the end of each survey week. This ensures that all field personnel are properly collecting section samples, distress types and distress severities for all street segments.
 When QA/QC issues are found, our staff documents the issues within MicroPAVER’s user interface. If distress types found are not within the 97% accuracy our QA/QC is expanded beyond our minimum 10% resurvey to 20% of the original survey d. Random and Systematic Re-Inspections – As described above our staff re-inspects, as a minimum, 10% of the original survey (OCTA only requires 5%). Per the agencies requests, our staff will submit PCI reports to the agency as project status reports for their review. Agencies will typically review specific pavement sections for PCI accuracy based on recent overlay or slurry seal maintenance; this serves as an initial accuracy check on our surveys (outside Bucknam QC efforts).

Additionally, if requested, our staff performs “ride-a-long” surveys with local agency staff to build City of Stanton, CA Page 20
2025 Citywide Pavement Management Plan – OCTA Submittal Final Report – March 13, 2025
consensus on how our MicroPAVER/StreetSaver USACE surveys are performed, recorded and reported on.

Random re-inspections will include a representative selection across the following categories:
• Functional classed (i.e. MPAH, locals);
• Surface types (e.g. AC or PCC);
• Pavement conditions (e.g. good, fair, poor);
• Inspectors;
• Geographical areas, if applicable.

For systematic re-inspections, this could be due to noticed trends such as specific treatment types (e.g. open-graded mixed), a specific inspector or geographical area. In these cases Bucknam continues to utilize a 10% re-inspection policy.
e. PCI Comparison with Past Surveys - if previous inspection data is available, new PCI’s calculated through the most recent inspections will be compared to previous PCI’s. If the variance in PCI is greater than +/- 10 PCI points, these sections will be flagged for further investigation and/or reinspection (In the cases that a PCI increases or decreases by 10 points follows the established CPMPG guidelines; Appendix A, page A-18).
f. Schedule of data submittal – Pending on the City’s last major PMP submittal, Bucknam will assist the agency in submitting the following:
 Master Plan of Arterial Highways (MPAH) routes will be surveyed and reported on at least once every two years
 Local streets will be surveyed and reported on every six years  Corresponding MPAH and local PCI reporting and budgetary reporting will be submitted every two years
g. Experience of Inspectors – Bucknam staff have been trained on the use of StreetSaver and the USACE segment calibration and inspection practices. Mr. Peter Bucknam (Project Manager) and staff (see below) have completed the PMP Certification of Professional Development courses.

Bucknam field technicians are trained using the USACE survey methodologies and have passed OCTA’s prequalification testing.

Bucknam Infrastructure Group inspectors have attended formal training on pavement condition distress surveys. This training was conducted prior to performing any work using the ASTM D6433 protocols, consistent with OCTA’s requirements.

City of Stanton, CA Page 21
2025 Citywide Pavement Management Plan – OCTA Submittal Final Report – March 13, 2025
h. Field data collection safety procedures – Bucknam field survey techniques utilize the following procedures:
a. All vehicles are properly marked or flagged with appropriate sign markings indicating that a “PAVEMENT SURVEY IS IN PROGRESS”
b. All vehicles have the proper flashing amber light beacons placed on the top of the vehicle to allow for proper visibility and line-of-site warning c. Large MPAH routes are surveyed using two field technicians to increase traffic control warning and safety
d. While parking or stopping along the survey route, vehicles legally park within the rightof-way or use a parking lot e. All field technicians wear ANSI – 105 Class II safety vests XV. APPENDIX E – PAVEMENT MANAGEMENT DATA FILES
The City of Stanton MicroPAVER database (.e70 file) has been enclosed for City and OCTA use. This data and the associated reporting data includes:
• Street names and limits for the City’s public streets • Street identifiers (Branch ID, Section ID)
• Direction
• Begin and end of section
• Length, width and true areas
• Functional Classification (MPAH, Local)
• Number of travel lanes
• Pavement Condition Index (PCI) and date of inspection • Type of recommended treatment
• Cost of recommended treatment
City of Stanton, CA Page 22
2025 Citywide Pavement Management Plan – OCTA Submittal Final Report – March 13, 2025
XVI. APPENDIX F – GIS MAPS / CURRENT CONDITIONS
7800 Katella Avenue
Stanton, CA 90680
P | (714) 379-9222
F | (714) 890-1443
[email protected]
StantonCA.gov
Community Pride & Forward Vision
Date:

June 10, 2025
Charvalen Alacar
Section Manager,
Measure M Local
Programs
Orange County
Transportation
Authority
550 S. Main Street
P.O. Box 14184
Orange, CA 92863
Subject: City of Stanton Land Use Planning Strategies
To Charvalen Alacar,
One requirement for continued Measure M eligibility is as follows:
“A letter outlining the approach to land use planning strategies or policies that accommodate transit and non-motorized transportation should be provided with supporting General Plan excerpts. Policy summaries that directly tie land use planning to alternative modes are required.” The following excerpts from our General Plan are provided to comply with this requirement:

Chapter 8 – Regional Coordination - Goal RC-2.1 Develop and maintain an effective Growth Management Plan that operates to the advantage of both the city of Stanton as well as the County and regional level.

Action RC-2.1.7 (a) - Promote housing locations near and/or within employment centers to enable shorter commutes and encourage transitoriented mobility.

Action RC-2.1.7 (b) - Support the development of diverse types of public and private transit services to facilitate travel.

Action RC-2.1.7 (c) - Encourage higher density and/or mixed-used development along major transit corridors and transit stops.

Chapter 5 – Infrastructure and Community Services - Goal ICS-1.2 Encourage alternatives to the private automobile by increasing access and opportunities to public transit, as well as to other alternative modes of transportation, such as biking and walking.

Action ICS-1.2.1 (h)As part of the plan review of future development proposals, the demand for vehicular, pedestrian, bicycle, and other transportation modes shall be reviewed and the city shall determine the appropriate modes applicable to each development project that assist in accomplishing goal ICS-1.2.

Attachment: H
Click here to return to the agenda.
7800 Katella Avenue
Stanton, CA 90680
P | (714) 379-9222
F | (714) 890-1443
[email protected]
StantonCA.gov
Community Pride & Forward Vision
Date:

June 10, 2025
Charvalen Alacar
Section Manager,
Measure M Local
Programs
Orange County
Transportation
Authority
550 S. Main Street
P.O. Box 14184
Orange, CA 92863
If you have any questions, please contact me at (714) 890-4203.

Sincerely,
Cesar Rangel, P.E.

Director of Public Works / City Engineer

INFRASTRUCTURE & COMMUNITY SERVICES
Stanton General Plan 5-1
CHAPTER 5
A. INTRODUCTION
Infrastructure and community services are the underlying components of a well-functioning community. Poorly maintained or inadequate infrastructure can impede the well-being of the community and impair public health and safety.

Local governments can promote appropriate levels of infrastructure by establishing favorable parameters for traffic levels of service (LOS), pedestrian safety, water supply, and solid waste and wastewater removal. Local governments can also promote the expansion of educational facilities, library services, civic events, and other public services. Therefore, the purpose of the Infrastructure & Community Services Element is to:
 Identify the strengths, opportunities, and key issues of the city’s infrastructure and public service systems.
 Establish goals, strategies and actions affecting infrastructure and public services.  Provide a framework for determining appropriate infrastructure improvements and expansion of public services.
 Provide a framework for providing sufficient infrastructure and public services to meet the existing and future needs of the city of Stanton.

The Infrastructure & Community Services Element is to be used as a policy guide for infrastructure and public service improvements by decision makers, city staff, and the community. This Element is closely related to other elements of the Stanton General Plan, especially the Community Development Element. The Community Development Element provides the designations for residential, commercial, industrial and public uses throughout the city, which all require sufficient infrastructure and community services to function properly.

B. BACKGROUND

TRANSPORTATION
Transportation issues are closely related to other elements of the General Plan, such as the Circulation Element, Land Use Element, Housing Element, Community Health and Safety Element, Community Design Element, and Economic Development Element. With the near build out of the city and the limited space available for transportation related improvements, several key issues arise, including:
 What steps can the city take to best plan for the impacts of the Smart Street Program on Beach Boulevard and Katella Avenue?
 How can the traffic flows along Beach Boulevard and Katella Avenue be improved without negatively affecting businesses within the city?  How can access from local neighborhoods to the major arterials be improved?  How can access from major arterials to adjoining businesses be improved?  What measures can be taken to improve pedestrian safety along major arterials? 5-14
Action ICS-1.1.2 (c)
Revise parking policies to allow for increased flexibility with parking standards, encourage shared parking between uses, and facilitate the establishment of parking districts to manage and maintain off-street parking locations.

Action ICS-1.1.2 (d)
Maintain level of service (LOS) D or better on city streets and LOS E or better for CMP or Smart Street roadways.

Action ICS-1.1.2 (e)
Review and determine if there are corridors or intersections where a future operating condition of LOS E may be acceptable if the impact of the mitigation to address that condition would prohibit other important goals from being achieved.

Strategy ICS-1.1.3
Integrate OCTA’s Smart Street Program with improvements and modifications, such as lot consolidation, coordinated planning of adjacent properties, and driveway consolidation.

Action ICS-1.1.3 (a)
Ensure improvements and modifications to streets are efficiently integrated within the Smart Street Program.

Action ICS-1.1.3 (b)
Establish a sign program that is integrated with the Smart Street Program, and includes sign consolidation and directional signs design.

Goal ICS-1.2
Encourage alternatives to the private automobile by increasing access and opportunities to public transit, as well as to other alternative modes of transportation, such as biking and walking.

Strategy ICS-1.2.1
Capitalize on the economic development and community revitalization potential of transit operations.

INFRASTRUCTURE & COMMUNITY SERVICES
Stanton General Plan 5-15
Action ICS-1.2.1 (a)
Study the planning and development implications of a regional light rail stop in downtown Stanton.

Action ICS-1.2.1 (b)
Encourage transit supportive uses at key locations, as well as provide appropriate buffers between transit areas and adjoining uses.

Action ICS-1.2.1 (c)
Require that major roadway projects consider planning for future transit corridors and uses, such as bus rapid transit and future light rail opportunities.

Action ICS-1.2.1 (d)
Within future design guidelines documents provide appropriate mitigation for the impacts of future light rail uses, such as landscape buffers, urban design consideration and noise mitigation.

Action ICS-1.2.1 (e)
Develop a citywide framework plan for improving transit.

Action ICS-1.2.1 (f)
Prepare a Specific Plan or master plan for mixed-use/transitoriented development at the Pacific Electric Corridor and Beach Boulevard.

Action ICS-1.2.1 (g)
Prepare and adopt a Bicycle Master Plan.

Action ICS-1.2.1 (h)
As part of the plan review of future development proposals, the demand for vehicular, pedestrian, bicycle, and other
transportation modes shall be reviewed and the city shall determine the appropriate modes applicable to each
development project that assist in accomplishing goal ICS-1.2.

REGIONAL COORDINATION
Stanton General Plan 8-1
CHAPTER 8
A. INTRODUCTION
The city of Stanton is located in one of the country’s most dynamic metropolitan areas. The city lies within a vast interconnected region that includes the cities and counties comprising southern California. Given many issues that affect the city of Stanton also affect the region as a whole, the city, while focused on meeting the needs of its residents and businesses, also recognizes its regional role. Coordinating Stanton’s city planning, county, regional and state bodies is essential to maintain intergovernmental relations to foster a positive economic and political environment.

The goal of the Regional Coordination Element is to recognize the depth and breadth of interconnectivity among local jurisdictions in the region and promote coordination in relation to issues such as housing, circulation, land use, and air quality. This element serves to recognize the need to participate in and influence the plans and programs operating on a scale larger than the city of Stanton.

Based on this goal, this Element has been subdivided into three components: housing, growth management, and air quality. The housing section addresses the regional context of housing, as a separate but related component of the Housing Element. The growth management section addresses regional circulation, land use issues and Measure M, which are also addressed on a citywide level in the Community Development and Infrastructure & Community Services Elements. The air quality section addresses the city’s regional role in addressing the quality of air and outlines goals and policies to limit the release of pollutants.

B. BACKGROUND
During the early 1990s, local jurisdictions in Orange County formed a structure for countywide coordination. Through a tier of policy, technical and executive advisory groups, emerging issues such as congestion management and air quality improvements are addressed. Coordinated jointly by the Orange County Division of the League of California Cities and the County of Orange, this mechanism has enabled cities to benefit from combined analysis, yet retain the ability to take individual policy positions as desired. Other regional planning agencies and groups include the Southern California Association of Governments (SCAG), the Southern California Air Quality Management District (SCAQMD), and the Orange County Local Agency Formation Commission (OC LAFCO).

HOUSING
Housing is an issue of statewide importance. The city of Stanton acknowledges its significance by not only addressing the city’s commitment to providing adequate opportunities for housing development for its current and future residents in the General Plan Housing Element, but also by addressing the issue as a regional matter in the Regional Coordination Element.

With high property values, fluctuating interest rates and real income growth lagging behind costs of living, the state and county’s housing affordability gap continues to widen. To ease the burdens of mortgages and rents, many families have decided to share homes. This has resulted in strains 8-2
on the infrastructure and on public services. Other families have sought less expensive housing in the Inland Empire, while maintaining their employment in Orange County; as a result, freeway congestion has increased, family budgets are increasingly impacted by transportation costs, and air quality has declined. Attracting workforce for local businesses within the region is a growing challenge.

To address the issue of affordable housing, the city of Stanton is committed to meeting its Regional Housing Needs Assessment (RHNA) goals. However, as a built-out city, Stanton must rely primarily on infill development to meet its housing needs. As such, the reuse and redevelopment of underutilized properties provide the greatest opportunity for housing within the city.

GROWTH MANAGEMENT
Less than one percent of the city’s area remains vacant, some of which is utilized as greenbelts or may be lying vacant as a brownfield. The majority of recent development in the city has therefore involved the recycling of older uses into new more efficient uses. For Stanton, growth management involves the efficient and productive reuse of these parcels in an orderly manner, benefiting current and future residents.

Orange County voters, in 1990, approved Measure M, a 20-year program for transportation improvements. Upon approval of Measure M, cities were required to develop a Growth Management Plan as part of their General Plans, which ensures that development is based upon the city’s ability to provide an adequate circulation system and public facilities. This section of the Regional Coordination Element is designed to meet the requirements of Measure M and also the overall goal of managing growth sensibly within the city.

The Measure M-mandated Growth Management Plan distinguishes between “developed” and “developing” communities. Developed communities are assumed to have their public facilities in place to support envisioned development through the Land Use Element (in Stanton, the Community Development Element) of the General Plan, but may require new or improved transportation facilities to implement their Circulation Element (in Stanton, the Infrastructure and Community Services Element) and absorb regional impacts. The communities are only required to address transportation-related growth impacts. Developing communities are assumed to need additional public facilities to support the General Plan land uses, police, fire, parks, flood control, and other local needs. For Measure M purposes, the city of Stanton is a “developed” city.

Measure M, funded by a half-cent sales tax, allocates all revenues to local jurisdictions for local and regional transportation improvement and maintenance projects, within Orange County, in three major areas: freeways, streets, roads, and transit. By 2011, Measure M will have made possible nearly $4.2 billion worth of transportation improvements including the following:
 New lanes added to the Santa Ana (I-5), Costa Mesa (SR-55) and Riverside (SR-91) Freeways;
 A wider “El Toro Y,” where the San Diego Freeway (I-405) and Santa Ana Freeway (I-5) join;
 Launch of Metrolink commuter rail service and building new stations;  Bus discounts for seniors and the disabled, and;
 About $1.5 billion allocated for widening and street repair.

REGIONAL COORDINATION
Stanton General Plan 8-3
Since 1990, the city of Stanton has received more than $11.3 million in funding, of which $3.7 million was used to fill potholes, maintain streets, synchronize traffic signals, and resurface some roads. Future improvements include improvements to the intersection of Beach Boulevard and Stanford Avenue and widening and enhancing Knott Avenue with new medians, bike lanes, and landscaping.

Other funding monies will be used to fund GO LOCAL projects within the city. On August 14th, 2006, Orange County Transportation Authority Board of Directors approved a sample Cooperative Agreement and the Evaluation Criteria for the first two steps of the four-step GO LOCAL process for Orange County cities to develop their own transit vision to extend accessibility to Metrolink into their communities. The city has yet to formally submit a funding request to OCTA, however the new Buena Park Metrolink Station and the TOD study both provide a possibility for funding.

On November 7, 2006, Orange County voters approved the renewal of Measure M. The Renewed Measure M program will provide more than $11.8 billion to improve transportation in Orange County over a 30-year period beginning in 2011.

The $11.86 billion Renewed Measure M plan includes:
 More than $1 billion to expand Metrolink commuter-rail service in Orange County, including station improvements and grade separations;
 $1 million for new transit links between Metrolink stations and major activity centers;  Nearly $340 million to enhance transit service for seniors and the disabled;  $5 billion to reduce congestion and improve traffic flow on local freeways;  Nearly $4 billion to improve city streets and synchronize traffic signals countywide, and;  Nearly $240 million to clean up road runoff that pollutes waterways and beaches.

To receive these funds, the city of Stanton has adopted the following policies and programs:
 Growth Management Element to coordinate and reduce traffic congestion and ensure that adequate transportation facilities are provided for existing and future residents of the City and County;
 Development Mitigation Program to ensure all new development pays a share of the costs associate with public infrastructure and services needed to mitigate the projectrelated impacts;  Performance Monitoring Program (PMP) to monitor compliance with the established development phasing program. The intent is to ensure that public facilities improvements/ service enhancements or funding are provided for development to proceed;
 Comprehensive Phasing Program to ensure that infrastructure is provided commensurate with development, ensuring that development impacts are mitigated before exceeding establishment thresholds. The city of Stanton fulfills this phasing provision through its Capital Improvement Program (CIP) and project review process;  Transportation Demand Management (TDM) Ordinance to promote alternate work hours, park and ride facilities, carpools, vanpools, telecommuting and other traffic reduction strategies;
 Deficient intersections list as part of the inter-jurisdictional planning efforts, and; 8-4
 Housing and redevelopment incentives program to address a balanced approach to housing options and job opportunities.

AIR QUALITY
Environmental Setting
South Coast Air Basin
The South Coast Air Basin (Basin), in which the city of Stanton is located, is characterized as having a “Mediterranean” climate (a semi-arid environment with mild winters, warm summers, and moderate rainfall). The Basin is a 6,600-square mile area bounded by the Pacific Ocean to the west and the San Gabriel, San Bernardino, and San Jacinto Mountains to the north and east. The Basin includes all of Orange County and the non-desert portions of Los Angeles, Riverside, and San Bernardino Counties, in addition to the San Gorgonio Pass area in Riverside County; refer to Exhibit 4 (California Air Basins) for an illustration of the air basins in California. Its terrain and geographical location determine the distinctive climate of the Basin, as the Basin is a coastal plain with connecting broad valleys and low hills.

The general region lies in the semi-permanent high-pressure zone of the eastern Pacific. As a result, the climate is mild, tempered by cool sea breezes. The usually mild climatological pattern is interrupted infrequently by periods of extremely hot weather, winter storms, or Santa Ana winds.

The extent and severity of the air pollution problem in the Basin is a function of the area’s natural physical characteristics (weather and topography), as well as man-made influences (development patterns and lifestyle). Factors such as wind, sunlight, temperature, humidity, rainfall, and topography all affect the accumulation and/or dispersion of pollutants throughout the Basin.

Regulatory Framework
Regulatory oversight for air quality in the Basin rests at the regional level with the South Coast Air Quality Management District, the California Air Resources Board at the State level, and the Environmental Protection Agency Region IX office at the Federal level.

Air Quality Elements adopted by local jurisdictions, such as the city of Stanton, and the regulations placed on industry by state and regional agencies, primarily the South Coast Air Quality Management District (SCAQMD), the California Air Resources Board (CARB), and Air Pollution Control Districts seek to ensure that the public’s health and welfare is protected from these and other harmful contaminates. The CARB is responsible for the classification of air basins as attainment or non-attainment in accordance with the federal and state Clean Air Acts. Air Quality Elements also help to ensure that the standards for ozone and particulate matters are met by the dates stated above.

U.S. Environmental Protection Agency
The Environmental Protection Agency is responsible for implementing the Federal Clean Air Act, which was first enacted in 1955 and amended numerous times after. The Federal Clean Air Act established Federal air quality standards known as the National Ambient Air Quality Standards.

These standards identify levels of air quality for “criteria” pollutants that are considered the maximum levels of ambient (background) air pollutants considered safe, with an adequate margin

REGIONAL COORDINATION
Stanton General Plan 8-15
opportunities as appropriate and continue to provide incentives for private investments in these areas.

Action RC-2.1.6 (b)
Encourage development of underutilized and vacant infill site where public services and infrastructure are available.

Action RC-2.1.6 (c)
Monitor infrastructure and public facilities plans for major activity centers.

Strategy RC-2.1.7
Develop land use strategies and incentives to reduce the amount of vehicle miles traveled within city limits.

Action RC-2.1.7 (a)
Promote housing locations near and/or within employment centers to enable shorter commutes and encourage transitoriented mobility.

Action RC-2.1.7 (b)
Support the development of diverse types of public and private transit services to facilitate travel.

Action RC-2.1.7 (c)
Encourage higher density and/or mixed-used development along major transit corridors and transit stops.

Action RC-2.1.7 (d)
Encourage employment centers to provide support uses and services such as restaurants, retail uses, shuttle services to shopping areas, and child-care facilities in order to reduce vehicle trips.

Action RC-2.1.7 (e)
Monitor effectiveness of the city’s Transportation Demand Management Ordinance and make appropriate revisions.
1 CITY OF STANTON

REPORT TO THE CITY COUNCIL
TO: Honorable Mayor and Members of the City Council
DATE: June 10, 2025
SUBJECT: RESOLUTION DIRECTING THE AUDITOR-CONTROLLER OF THE

COUNTY OF ORANGE TO ADD THE PROTECTIVE SERVICES TAX TO
THE TAX ROLL FOR FISCAL YEAR 2025/26
REPORT IN BRIEF:

On August 6, 1985, the City of Stanton voters approved an initiative measure establishing a Protective Services Tax with a 2/3 majority vote. The proceeds from the Protective Services Tax are used for fire protection and suppression services provided by the City, which are contracted with the Orange County Fire Authority. Each year, the City Council must adopt a Resolution directing the Auditor-Controller to place this assessment on the property tax roll.

RECOMMENDED ACTION:

1. City Council find that this item is not subject to California Environmental Quality Act (“CEQA”) pursuant to Sections 15060(c)(2) (the activity will not result in a direct or reasonably foreseeable indirect physical change in the environment) and 15060(c)(3) (the activity is not a project as defined in Section 15378(b)(4) of the CEQA Guidelines, California Code of Regulations, Title 14, Chapter 3, because it has no potential for resulting in physical change to the environment, directly, or indirectly); and

2. Adopt Resolution No. 2025-17, directing the Orange County Auditor-Controller to place the Protective Services Tax on the property tax roll for Fiscal Year 2025/26, entitled:
“A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF STANTON,

CALIFORNIA, DIRECTING THE AUDITOR-CONTROLLER OF THE

COUNTY OF ORANGE, CALIFORNIA, TO ADD THE PROTECTIVE
SERVICES TAX TO THE TAX ROLL FOR FISCAL YEAR 2025/26”.

Item: 9J
Click here to return to the agenda.
2 BACKGROUND:

The tax roll was prepared by the City’s consultant, Harris & Associates (Exhibit A of Attachment A). The proceeds of this tax are included in the City’s Fiscal Year 2025/26 Proposed Budget.

FISCAL IMPACT:

The Fiscal Year 2025/26 estimated revenue of $390,000 is included in the City’s Protective Services Tax Special Revenue Fund (#223).

ENVIRONMENTAL IMPACT:

None.

LEGAL REVIEW:

None.

PUBLIC NOTIFICATION:

Through the normal agenda posting process.

STRATEGIC GOAL:

Goal 4. Ensure fiscal stability.

Prepared by: Michelle Bannigan, Finance Director
Approved by: Hannah Shin-Heydorn, City Manager
ATTACHMENT:

A. Resolution No. 2025-17
RESOLUTION NO. 2025-17

Page 1 of 2 ends

RESOLUTION NO. 2025-17

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF STANTON,

CALIFORNIA, DIRECTING THE AUDITOR-CONTROLLER OF THE COUNTY OF

ORANGE, CALIFORNIA, TO ADD THE PROTECTIVE SERVICES TAX TO THE TAX ROLL FOR FISCAL YEAR 2025/26
WHEREAS, at a special election held on August 6, 1985, the voters of the City of Stanton approved an initiative measure establishing a special protective services tax for fire protection and prevention services pursuant to California Government Code Section 53978; and
WHEREAS, the Ordinance set the rate of tax for each parcel in the City of Stanton identified by the County of Orange Assessor as follows:

A. For each parcel containing a single-family residential $24.00 unit (including condominium units)
B. For each residential unit in a multiple dwelling $24.00 C. For each mobile home site $18.00
D. For each parcel upon which there is located commercial $300.00 and/or industrial improvements or part thereof per acre AAT
E. For each parcel of vacant land $75.00
per acre or
part thereof
WHEREAS, a list of parcels, as identified by the County of Orange Assessor, has been compiled for transmittal to the County of Orange Auditor-Controller for inclusion on the tax roll and subsequent collection by the County of Orange Tax Collector (Exhibit A); and
WHEREAS, the City Council recognizes that the Proposed Fiscal Year 2025/26 Operating and Capital Budget will require adjustments from time to time, and accordingly, the City Manager is authorized to execute necessary transfers to carry out the scope of services as approved.

NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF STANTON, DOES RESOLVE, DECLARE, DETERMINE AND ORDER AS FOLLOWS:

SECTION 1: The City Council finds that this item is not subject to California Environmental Quality Act (“CEQA”) pursuant to Sections 15060(c)(2) (the activity will not result in a direct or reasonably foreseeable indirect physical change in the environment) and 15060(c)(3) (the activity is not a project as defined in Section Attachment: A
Click here to return to the agenda.

RESOLUTION NO. 2025-17

Page 2 of 2 ends

15378(b)(4) of the CEQA Guidelines, California Code of Regulations, Title 14, Chapter 3, because it has no potential for resulting in physical change to the environment, directly, or indirectly.

SECTION 2: The Auditor-Controller of the County of Orange is directed to add the Protective Services Tax, as set forth in the document marked Exhibit A and entitled “Protective Services Tax”, a copy of which is on file with the City and by this reference is incorporated herein as though set forth in full and at length, to the County of Orange property tax roll for Fiscal Year 2025/26 for the parcels and in the amounts indicated in Exhibit A.

SECTION 3: The City Clerk shall certify to the adoption of this Resolution.

ADOPTED, SIGNED AND APPROVED this 10th day of June 2025.

DAVID J. SHAWVER, MAYOR
APPROVED AS TO FORM:

HONGDAO NGUYEN, CITY ATTORNEY
ATTEST:

I, Patricia A. Vazquez, City Clerk of the City of Stanton, California DO HEREBY CERTIFY that the foregoing Resolution, being Resolution No. 2025-17 has been duly signed by the Mayor and attested by the City Clerk, all at a regular meeting of the Stanton City Council, held on June 10, 2025, and that the same was adopted, signed, and approved by the following vote to wit:

AYES:

NOES:

ABSENT:

ABSTAIN:

PATRICIA A. VAZQUEZ, CITY CLERK

CITY OF STANTON

PRELIMINARY ROLL

PROTECTIVE SERVICES TAX
FISCAL YEAR 2025-26

ORANGE COUNTY, CALIFORNIA
May 20, 2025

PREPARED BY
101 Progress, Suite 250
Irvine, CA 92618
www.weareharris.com

EXHIBIT A

Page 1 of 160 ends

Click here to return to the agenda.

APN LANDUSE ACRES DU'S TAX APN LANDUSE ACRES DU'S TAX
CITY OF STANTON PROTECTIVE SERVICES TAX - FY 2025-26

PRELIMINARY TAX ROLL

Page 1 ends

079-362-30 R 0 1 $24.00079-362-31 C 0.2 0 $60.00
079-363-01 V 0.09 1 $6.75
079-363-02 R 0 1 $24.00079-363-06 R 0 1 $24.00079-363-07 R 0 1 $24.00079-363-08 R 0 1 $24.00079-363-09 R 0 1 $24.00079-363-10 R 0.14 1 $24.00 079-363-11 R 0.14 1 $24.00
079-363-12 R 0 1 $24.00079-560-07 R 0 1 $24.00079-560-08 R 0 1 $24.00079-560-09 R 0 1 $24.00079-560-10 R 0 1 $24.00079-560-11 R 0 1 $24.00079-922-04 R 0 1 $24.00079-922-05 R 0 1 $24.00079-922-06 R 0 1 $24.00079-922-07 R 0 1 $24.00079-922-08 R 0 1 $24.00079-922-09 R 0 1 $24.00 079-922-10 R 0 1 $24.00079-922-11 R 0 1 $24.00079-922-12 R 0 1 $24.00079-922-13 R 0 1 $24.00079-922-14 R 0 1 $24.00079-922-15 R 0 1 $24.00079-922-16 R 0 1 $24.00079-922-17 R 0 1 $24.00079-922-18 R 0 1 $24.00079-922-19 R 0 1 $24.00079-922-20 R 0 1 $24.00079-922-21 R 0 1 $24.00079-922-22 R 0 1 $24.00079-922-23 R 0 1 $24.00079-922-24 R 0 1 $24.00079-922-25 R 0 1 $24.00079-922-26 R 0 1 $24.00079-922-27 R 0 1 $24.00079-922-28 R 0 1 $24.00079-922-29 R 0 1 $24.00079-922-30 R 0 1 $24.00079-922-31 R 0 1 $24.00 Landuse Key: C - Commercial M - Multi-Family Residential R - Single Family Residential (incl. Condos) T - Mobile Homes V - Vacant

EXHIBIT A

Page 2 of 160 ends

APN LANDUSE ACRES DU'S TAX APN LANDUSE ACRES DU'S TAX
CITY OF STANTON PROTECTIVE SERVICES TAX - FY 2025-26

PRELIMINARY TAX ROLL

Page 2 ends

079-922-32 R 0 1 $24.00079-922-33 R 0 1 $24.00
079-922-34 R 0 1 $24.00079-922-35 R 0 1 $24.00079-922-36 R 0 1 $24.00079-922-37 R 0 1 $24.00079-922-38 R 0 1 $24.00079-922-39 R 0 1 $24.00079-922-40 R 0 1 $24.00079-922-41 R 0 1 $24.00079-922-42 R 0 1 $24.00079-922-43 R 0 1 $24.00079-922-44 R 0 1 $24.00079-922-45 R 0 1 $24.00079-922-46 R 0 1 $24.00079-922-47 R 0 1 $24.00079-922-48 R 0 1 $24.00079-331-27 M 0.14 3 $72.00 079-541-10 R 0 1 $24.00079-541-11 R 0 1 $24.00079-541-12 R 0 1 $24.00079-541-13 R 0 1 $24.00 079-541-14 R 0 1 $24.00
079-541-15 R 0 1 $24.00079-541-16 R 0 1 $24.00079-541-17 R 0 1 $24.00079-541-23 R 0 1 $24.00079-541-30 R 0 1 $24.00079-541-31 R 0 1 $24.00079-541-32 R 0 1 $24.00079-541-33 R 0 1 $24.00079-541-34 R 0 1 $24.00079-541-35 R 0 1 $24.00079-922-71 R 0 1 $24.00079-922-72 R 0 1 $24.00079-922-73 R 0 1 $24.00079-922-74 R 0 1 $24.00079-922-75 R 0 1 $24.00079-922-76 R 0 1 $24.00079-922-77 R 0 1 $24.00079-922-78 R 0 1 $24.00079-922-79 R 0 1 $24.00079-923-10 C 0.35 0 $105.00 079-923-11 V 0.08 0 $6.00
Landuse Key: C - Commercial M - Multi-Family Residential R - Single Family Residential (incl. Condos) T - Mobile Homes V - Vacant

EXHIBIT A

Page 3 of 160 ends

APN LANDUSE ACRES DU'S TAX APN LANDUSE ACRES DU'S TAX
CITY OF STANTON PROTECTIVE SERVICES TAX - FY 2025-26

PRELIMINARY TAX ROLL

Page 3 ends

079-923-12 V 0.02 0 $1.50
079-931-01 R 0 1 $24.00
079-931-02 R 0 1 $24.00079-931-03 R 0 1 $24.00079-931-04 R 0 1 $24.00079-931-05 R 0 1 $24.00079-931-06 R 0 1 $24.00079-931-07 R 0 1 $24.00079-931-08 R 0 1 $24.00079-931-09 R 0 1 $24.00079-931-10 R 0 1 $24.00079-931-11 R 0 1 $24.00079-931-12 R 0 1 $24.00079-931-13 R 0 1 $24.00079-931-14 R 0 1 $24.00079-931-15 R 0 1 $24.00079-931-16 R 0 1 $24.00079-931-17 R 0 1 $24.00079-931-18 R 0 1 $24.00079-931-19 R 0 1 $24.00079-931-20 R 0 1 $24.00079-931-21 R 0 1 $24.00 079-931-22 R 0 1 $24.00079-931-23 R 0 1 $24.00079-931-24 R 0 1 $24.00079-931-25 R 0 1 $24.00079-931-26 R 0 1 $24.00079-931-27 R 0 1 $24.00079-931-28 R 0 1 $24.00079-931-29 R 0 1 $24.00079-931-30 R 0 1 $24.00079-931-31 R 0 1 $24.00079-931-32 R 0 1 $24.00079-931-33 R 0 1 $24.00079-541-36 R 0 1 $24.00079-541-37 R 0 1 $24.00079-541-43 C 1.27 0 $381.00 079-541-44 M 1.15 28 $672.00079-541-45 M 0.19 4 $96.00079-541-46 M 0.17 4 $96.00079-541-47 M 0.17 4 $96.00079-541-48 M 0.48 4 $96.00079-541-49 M 0.18 4 $96.00079-922-80 R 0 1 $24.00 Landuse Key: C - Commercial M - Multi-Family Residential R - Single Family Residential (incl. Condos) T - Mobile Homes V - Vacant

EXHIBIT A

Page 4 of 160 ends

APN LANDUSE ACRES DU'S TAX APN LANDUSE ACRES DU'S TAX
CITY OF STANTON PROTECTIVE SERVICES TAX - FY 2025-26

PRELIMINARY TAX ROLL

Page 4 ends

079-922-81 R 0 1 $24.00079-922-82 R 0 1 $24.00
079-922-83 R 0 1 $24.00079-923-08 C 0.55 0 $165.00
079-923-09 V 0.04 0 $3.00
079-331-28 M 0.14 4 $96.00
079-331-29 M 0.14 2 $48.00
079-331-30 M 0.14 2 $48.00
079-331-31 C 0.14 1 $42.00
079-331-33 C 0.63 0 $189.00
079-332-01 C 0.21 0 $63.00
079-332-02 C 0.35 0 $105.00
079-332-03 V 0.14 0 $10.50
079-332-05 C 0.26 0 $78.00
079-332-09 C 0.21 0 $63.00
079-332-10 C 0.38 0 $114.00
079-332-11 C 0.18 0 $54.00
079-332-12 V 0.07 0 $5.25
079-332-13 C 0.35 0 $105.00
079-332-14 C 0.21 0 $63.00
079-332-17 C 0.63 0 $189.00
079-333-01 R 0.15 1 $24.00
079-333-02 R 0.15 1 $24.00
079-333-03 R 0.15 1 $24.00
079-333-10 R 0.14 1 $24.00
079-333-14 R 0.15 1 $24.00
079-331-05 C 0.49 0 $147.00
079-331-06 C 0.21 0 $63.00079-331-07 C 0.14 0 $42.00079-331-08 C 0.14 0 $42.00079-331-15 C 0.42 0 $126.00 079-331-26 M 0.14 3 $72.00079-353-02 R 0 1 $24.00
079-353-03 R 0 1 $24.00079-353-04 R 0 1 $24.00079-353-05 R 0 1 $24.00079-353-06 R 0 1 $24.00079-353-07 M 0.16 2 $48.00 079-353-08 R 0 1 $24.00
079-353-09 R 0 1 $24.00079-353-10 R 0 1 $24.00079-354-02 R 0 1 $24.00079-354-06 R 0 1 $24.00079-354-07 R 0 1 $24.00 Landuse Key: C - Commercial M - Multi-Family Residential R - Single Family Residential (incl. Condos) T - Mobile Homes V - Vacant

EXHIBIT A

Page 5 of 160 ends

APN LANDUSE ACRES DU'S TAX APN LANDUSE ACRES DU'S TAX
CITY OF STANTON PROTECTIVE SERVICES TAX - FY 2025-26

PRELIMINARY TAX ROLL

Page 5 ends

079-354-08 R 0 1 $24.00079-354-09 R 0 1 $24.00
079-354-10 R 0 1 $24.00079-355-01 R 0 1 $24.00079-355-02 R 0 1 $24.00079-355-03 R 0 1 $24.00079-355-07 R 0.16 1 $24.00 079-355-09 R 0 1 $24.00079-355-10 R 0 1 $24.00079-355-13 C 0.19 0 $57.00 079-355-14 C 0.22 0 $66.00
079-356-01 R 0 1 $24.00079-356-02 R 0 1 $24.00079-356-03 R 0 1 $24.00079-356-04 R 0 1 $24.00079-356-05 R 0 1 $24.00079-356-06 M 0.16 2 $48.00 079-356-07 R 0 1 $24.00079-356-08 R 0 1 $24.00079-356-09 R 0 1 $24.00079-356-10 R 0 1 $24.00079-357-01 R 0 1 $24.00 079-357-02 R 0 1 $24.00079-357-03 R 0 1 $24.00079-357-04 R 0 1 $24.00079-357-07 R 0 1 $24.00079-357-08 R 0 1 $24.00079-357-10 R 0 1 $24.00079-357-11 R 0 1 $24.00079-357-12 R 0.16 1 $24.00 079-357-15 C 0.16 1 $48.00
079-358-01 R 0 1 $24.00
079-358-02 R 0 1 $24.00079-333-18 C 0.45 0 $135.00
079-333-19 C 0.22 0 $66.00079-333-20 C 0.08 1 $24.00079-334-02 R 0.17 1 $24.00 079-334-04 R 0.15 1 $24.00
079-334-05 R 0.15 1 $24.00
079-334-06 R 0.15 1 $24.00
079-334-07 C 0.3 0 $90.00
079-334-08 R 0.15 1 $24.00079-334-09 M 0.3 5 $120.00
079-334-10 M 0.15 3 $72.00
Landuse Key: C - Commercial M - Multi-Family Residential R - Single Family Residential (incl. Condos) T - Mobile Homes V - Vacant

EXHIBIT A

Page 6 of 160 ends

APN LANDUSE ACRES DU'S TAX APN LANDUSE ACRES DU'S TAX
CITY OF STANTON PROTECTIVE SERVICES TAX - FY 2025-26

PRELIMINARY TAX ROLL

Page 6 ends

079-334-11 M 0.15 5 $120.00
079-334-12 R 0.15 1 $24.00
079-334-13 R 0.15 1 $24.00
079-334-17 R 0.15 1 $24.00
079-334-18 R 0.15 1 $24.00
079-334-20 R 0.15 1 $24.00
079-334-21 R 0.15 1 $24.00
079-334-22 R 0.15 1 $24.00
079-334-23 R 0.15 1 $24.00
079-334-24 R 0.15 1 $24.00
079-334-25 R 0.35 1 $24.00
079-341-03 R 0 1 $24.00079-341-04 R 0 1 $24.00079-341-05 C 0.22 0 $66.00 079-341-06 C 0.06 0 $18.00
079-341-09 V 0.02 1 $1.50
079-341-11 R 0 1 $24.00079-341-13 R 0 1 $24.00079-341-14 R 0 1 $24.00079-341-15 R 0 1 $24.00079-342-01 C 0.15 0 $45.00 079-342-04 C 0.08 0 $24.00
079-342-08 R 0 1 $24.00
079-342-09 R 0 1 $24.00079-342-10 R 0 1 $24.00079-342-12 R 0 1 $24.00079-342-13 R 0 1 $24.00079-342-15 C 0.23 0 $69.00 079-342-16 C 0.3 0 $90.00
079-343-05 C 0.21 0 $63.00079-343-06 R 0 1 $24.00
079-343-07 R 0 1 $24.00079-343-08 R 0 1 $24.00079-343-12 C 0.37 0 $111.00 079-343-15 C 0.15 2 $45.00079-343-16 C 0.15 1 $45.00079-344-01 R 0 1 $24.00 079-344-02 R 0 1 $24.00079-344-06 R 0.16 1 $24.00
079-344-07 R 0 1 $24.00
079-344-09 R 0 1 $24.00079-344-10 R 0 1 $24.00079-344-11 R 0 1 $24.00079-344-12 R 0 1 $24.00 Landuse Key: C - Commercial M - Multi-Family Residential R - Single Family Residential (incl. Condos) T - Mobile Homes V - Vacant

EXHIBIT A

Page 7 of 160 ends

APN LANDUSE ACRES DU'S TAX APN LANDUSE ACRES DU'S TAX
CITY OF STANTON PROTECTIVE SERVICES TAX - FY 2025-26

PRELIMINARY TAX ROLL

Page 7 ends

079-345-04 R 0 1 $24.00079-345-05 M 0.16 2 $48.00
079-345-06 R 0 1 $24.00079-345-07 R 0 1 $24.00079-345-08 R 0 1 $24.00079-345-12 R 0 1 $24.00079-345-13 R 0 1 $24.00079-345-14 R 0 1 $24.00079-345-15 R 0 1 $24.00079-345-16 R 0 1 $24.00079-346-01 R 0 1 $24.00079-346-02 R 0 1 $24.00079-346-03 R 0 1 $24.00079-346-04 R 0 1 $24.00079-346-05 R 0.16 1 $24.00 079-346-06 R 0 1 $24.00079-346-07 R 0 1 $24.00079-346-09 R 0 1 $24.00079-346-10 R 0 1 $24.00079-346-11 R 0 1 $24.00079-351-01 R 0 1 $24.00079-351-02 R 0 1 $24.00 079-351-05 R 0 1 $24.00079-351-09 R 0 1 $24.00079-351-12 R 0 1 $24.00079-351-13 R 0 1 $24.00079-351-14 R 0.23 1 $24.00 079-351-15 R 0 1 $24.00079-351-16 R 0 1 $24.00079-352-01 R 0 1 $24.00079-352-02 R 0 1 $24.00079-352-03 R 0 1 $24.00079-352-04 R 0 1 $24.00079-352-05 R 0 1 $24.00079-352-06 R 0 1 $24.00079-352-07 R 0 1 $24.00079-352-08 V 0.16 1 $12.00079-352-09 R 0 1 $24.00079-352-10 R 0 1 $24.00079-353-01 R 0.16 1 $24.00 079-358-03 R 0 1 $24.00079-358-04 R 0 1 $24.00079-358-05 R 0 1 $24.00079-358-06 R 0 1 $24.00 Landuse Key: C - Commercial M - Multi-Family Residential R - Single Family Residential (incl. Condos) T - Mobile Homes V - Vacant

EXHIBIT A

Page 8 of 160 ends

APN LANDUSE ACRES DU'S TAX APN LANDUSE ACRES DU'S TAX
CITY OF STANTON PROTECTIVE SERVICES TAX - FY 2025-26

PRELIMINARY TAX ROLL

Page 8 ends

079-358-07 R 0 1 $24.00079-358-08 R 0 1 $24.00
079-358-11 R 0 1 $24.00079-358-13 R 0 1 $24.00079-361-03 R 0 1 $24.00079-361-04 R 0 1 $24.00079-361-05 R 0 1 $24.00079-361-06 R 0 1 $24.00079-361-07 R 0 1 $24.00079-361-08 R 0 1 $24.00079-361-10 R 0 1 $24.00079-361-11 R 0 1 $24.00079-361-13 R 0 1 $24.00079-361-14 R 0 1 $24.00079-361-22 R 0 1 $24.00079-361-23 R 0 1 $24.00079-361-24 R 0 1 $24.00079-361-25 R 0 1 $24.00079-361-26 R 0 1 $24.00079-361-27 R 0 1 $24.00079-361-28 R 0 1 $24.00079-361-29 R 0 1 $24.00 079-361-30 R 0 1 $24.00079-361-31 R 0 1 $24.00079-361-32 R 0 1 $24.00079-361-33 R 0 1 $24.00079-361-34 R 0 1 $24.00079-361-35 R 0 1 $24.00079-361-36 R 0 1 $24.00079-361-37 R 0 1 $24.00079-361-38 R 0 1 $24.00079-361-39 R 0 1 $24.00079-361-40 R 0 1 $24.00079-362-01 R 0 1 $24.00079-362-02 R 0 1 $24.00079-362-03 R 0 1 $24.00079-362-06 R 0 1 $24.00079-362-09 C 0.05 0 $15.00 079-362-11 R 0 1 $24.00
079-362-16 R 0 1 $24.00079-362-17 R 0 1 $24.00079-362-20 R 0 1 $24.00079-362-21 R 0 1 $24.00079-362-23 R 0 1 $24.00 Landuse Key: C - Commercial M - Multi-Family Residential R - Single Family Residential (incl. Condos) T - Mobile Homes V - Vacant

EXHIBIT A

Page 9 of 160 ends

APN LANDUSE ACRES DU'S TAX APN LANDUSE ACRES DU'S TAX
CITY OF STANTON PROTECTIVE SERVICES TAX - FY 2025-26

PRELIMINARY TAX ROLL

Page 9 ends

079-362-24 R 0 1 $24.00079-362-25 R 0 1 $24.00
079-362-26 R 0 1 $24.00079-362-27 C 0.16 1 $48.00
079-362-28 C 0.15 0 $45.00
079-362-29 R 0 1 $24.00079-363-16 V 0.07 1 $5.25
079-363-17 R 0 1 $24.00079-363-18 R 0 1 $24.00079-363-19 R 0 1 $24.00079-363-20 R 0 1 $24.00079-363-22 R 0 1 $24.00079-363-23 R 0 1 $24.00079-363-24 R 0 1 $24.00079-371-05 T 0.68 5 $90.00 079-371-22 T 0.26 3 $54.00
079-371-24 T 7.17 94 $1,692.00
079-371-32 C 0.4 0 $120.00
079-541-03 V 0.45 0 $33.75
079-541-06 R 0 1 $24.00079-541-07 R 0 1 $24.00079-541-08 R 0 1 $24.00 079-541-09 R 0 1 $24.00
079-541-50 M 0.18 4 $96.00
079-541-51 M 0.21 4 $96.00079-541-55 M 0.31 4 $96.00079-541-56 C 0.02 0 $6.00 079-541-57 V 0.04 0 $3.00
079-542-01 R 0 1 $24.00079-542-02 R 0 1 $24.00079-542-03 R 0 1 $24.00079-542-04 R 0 1 $24.00079-542-05 R 0 1 $24.00079-542-06 R 0 1 $24.00079-542-07 R 0 1 $24.00079-542-08 R 0 1 $24.00079-542-09 R 0 1 $24.00079-542-10 R 0 1 $24.00079-542-11 R 0 1 $24.00079-542-12 R 0 1 $24.00079-542-13 R 0 1 $24.00079-542-14 R 0 1 $24.00079-542-16 R 0 1 $24.00079-542-17 R 0 1 $24.00 Landuse Key: C - Commercial M - Multi-Family Residential R - Single Family Residential (incl. Condos) T - Mobile Homes V - Vacant

EXHIBIT A

Page 10 of 160 ends

APN LANDUSE ACRES DU'S TAX APN LANDUSE ACRES DU'S TAX
CITY OF STANTON PROTECTIVE SERVICES TAX - FY 2025-26

PRELIMINARY TAX ROLL

Page 10 ends

079-542-18 R 0 1 $24.00
079-542-19 R 0 1 $24.00
079-542-20 M 0.24 4 $96.00
079-542-21 M 0.24 4 $96.00
079-543-02 R 0 1 $24.00079-543-03 R 0 1 $24.00079-543-05 C 0.32 0 $96.00 079-543-07 C 0.23 0 $69.00
079-543-08 M 0.52 3 $72.00
079-551-01 R 0 1 $24.00079-551-02 R 0 1 $24.00079-551-03 R 0 1 $24.00079-551-04 R 0 1 $24.00079-551-05 R 0 1 $24.00079-551-06 R 0 1 $24.00079-551-07 R 0 1 $24.00079-551-08 R 0 1 $24.00079-551-09 R 0 1 $24.00079-551-10 R 0 1 $24.00079-551-11 R 0 1 $24.00079-551-12 R 0 1 $24.00079-551-13 R 0 1 $24.00 079-551-14 R 0 1 $24.00
079-551-15 R 0 1 $24.00079-551-16 R 0 1 $24.00079-551-18 R 0 1 $24.00079-551-19 R 0 1 $24.00079-551-20 R 0 1 $24.00079-551-21 R 0 1 $24.00079-551-22 R 0 1 $24.00079-551-23 R 0 1 $24.00079-551-24 R 0 1 $24.00079-551-25 R 0 1 $24.00079-551-26 R 0 1 $24.00079-551-27 R 0 1 $24.00079-551-28 R 0 1 $24.00079-551-29 R 0 1 $24.00079-551-30 R 0 1 $24.00079-551-31 R 0 1 $24.00079-551-32 R 0 1 $24.00079-551-33 R 0 1 $24.00079-551-34 R 0 1 $24.00079-551-36 C 0.31 0 $93.00 079-551-37 C 1.2 0 $360.00
Landuse Key: C - Commercial M - Multi-Family Residential R - Single Family Residential (incl. Condos) T - Mobile Homes V - Vacant

EXHIBIT A

Page 11 of 160 ends

APN LANDUSE ACRES DU'S TAX APN LANDUSE ACRES DU'S TAX
CITY OF STANTON PROTECTIVE SERVICES TAX - FY 2025-26

PRELIMINARY TAX ROLL

Page 11 ends

079-552-01 R 0 1 $24.00
079-552-02 R 0 1 $24.00
079-552-03 R 0 1 $24.00079-552-04 R 0 1 $24.00079-552-05 R 0 1 $24.00079-552-06 R 0 1 $24.00079-553-01 R 0 1 $24.00079-553-02 R 0 1 $24.00079-553-03 R 0 1 $24.00079-553-04 R 0 1 $24.00079-553-05 R 0 1 $24.00079-553-06 R 0 1 $24.00079-553-07 R 0 1 $24.00079-553-08 R 0 1 $24.00079-553-09 R 0 1 $24.00079-553-10 R 0 1 $24.00079-553-11 R 0 1 $24.00079-553-12 R 0 1 $24.00079-553-13 R 0 1 $24.00079-553-14 R 0 1 $24.00079-553-15 R 0 1 $24.00079-553-16 R 0 1 $24.00 079-553-17 R 0 1 $24.00079-553-18 R 0 1 $24.00079-553-19 R 0 1 $24.00079-553-20 R 0 1 $24.00079-553-21 R 0 1 $24.00079-553-22 R 0 1 $24.00079-553-23 R 0 1 $24.00079-553-24 R 0 1 $24.00079-560-01 R 0 1 $24.00079-560-02 R 0 1 $24.00079-560-03 R 0 1 $24.00079-560-04 R 0 1 $24.00079-560-05 R 0 1 $24.00079-560-06 R 0 1 $24.00079-560-12 R 0 1 $24.00079-560-13 R 0 1 $24.00079-560-14 R 0 1 $24.00079-560-15 R 0 1 $24.00079-560-16 R 0 1 $24.00079-560-17 R 0 1 $24.00079-560-18 R 0 1 $24.00079-560-19 R 0 1 $24.00 Landuse Key: C - Commercial M - Multi-Family Residential R - Single Family Residential (incl. Condos) T - Mobile Homes V - Vacant

EXHIBIT A

Page 12 of 160 ends

APN LANDUSE ACRES DU'S TAX APN LANDUSE ACRES DU'S TAX
CITY OF STANTON PROTECTIVE SERVICES TAX - FY 2025-26

PRELIMINARY TAX ROLL

Page 12 ends

079-560-20 R 0 1 $24.00
079-560-21 R 0 1 $24.00
079-560-22 R 0 1 $24.00079-560-23 R 0 1 $24.00079-560-24 R 0 1 $24.00079-560-25 R 0 1 $24.00079-560-26 R 0 1 $24.00079-560-27 R 0 1 $24.00079-560-28 R 0 1 $24.00079-560-29 R 0 1 $24.00079-560-30 R 0 1 $24.00079-560-31 R 0 1 $24.00079-560-32 R 0 1 $24.00079-560-33 R 0 1 $24.00079-560-34 R 0 1 $24.00079-560-35 R 0 1 $24.00079-560-36 R 0 1 $24.00079-560-37 R 0 1 $24.00079-560-38 R 0 1 $24.00079-560-39 R 0 1 $24.00079-560-40 R 0 1 $24.00079-591-01 R 0 1 $24.00 079-591-02 R 0 1 $24.00079-591-03 R 0 1 $24.00079-591-04 R 0 1 $24.00079-591-05 R 0 1 $24.00079-591-06 R 0 1 $24.00079-591-07 R 0 1 $24.00079-591-08 R 0 1 $24.00079-591-09 R 0 1 $24.00079-591-10 R 0 1 $24.00079-591-11 R 0 1 $24.00079-591-12 R 0 1 $24.00079-591-13 R 0 1 $24.00079-591-14 R 0 1 $24.00079-591-15 R 0 1 $24.00079-591-16 R 0 1 $24.00079-592-01 R 0 1 $24.00079-592-02 R 0 1 $24.00079-592-03 R 0 1 $24.00079-592-04 R 0 1 $24.00079-592-05 R 0 1 $24.00079-592-06 R 0 1 $24.00079-592-07 R 0 1 $24.00 Landuse Key: C - Commercial M - Multi-Family Residential R - Single Family Residential (incl. Condos) T - Mobile Homes V - Vacant

EXHIBIT A

Page 13 of 160 ends

APN LANDUSE ACRES DU'S TAX APN LANDUSE ACRES DU'S TAX
CITY OF STANTON PROTECTIVE SERVICES TAX - FY 2025-26

PRELIMINARY TAX ROLL

Page 13 ends

079-592-08 R 0 1 $24.00
079-592-09 R 0 1 $24.00
079-592-10 R 0 1 $24.00079-592-11 R 0 1 $24.00079-592-12 R 0 1 $24.00079-592-13 R 0 1 $24.00079-592-14 R 0 1 $24.00079-592-15 R 0 1 $24.00079-592-16 R 0 1 $24.00079-593-01 R 0 1 $24.00079-593-02 R 0 1 $24.00079-593-03 R 0 1 $24.00079-593-04 R 0 1 $24.00079-593-05 R 0 1 $24.00079-593-06 R 0 1 $24.00079-593-07 R 0 1 $24.00079-593-08 R 0 1 $24.00079-593-09 R 0 1 $24.00079-593-10 R 0 1 $24.00079-593-11 R 0 1 $24.00079-593-12 R 0 1 $24.00079-593-13 R 0 1 $24.00 079-593-14 R 0 1 $24.00079-593-15 R 0 1 $24.00079-593-16 R 0 1 $24.00079-594-01 R 0 1 $24.00079-594-02 R 0 1 $24.00079-594-03 R 0 1 $24.00079-594-04 R 0 1 $24.00079-594-05 R 0 1 $24.00079-594-06 R 0 1 $24.00079-594-07 R 0 1 $24.00079-594-08 R 0 1 $24.00079-594-09 R 0 1 $24.00079-594-10 R 0 1 $24.00079-594-11 R 0 1 $24.00079-594-12 R 0 1 $24.00079-594-13 R 0 1 $24.00079-594-14 R 0 1 $24.00079-594-15 R 0 1 $24.00079-594-16 R 0 1 $24.00079-594-17 R 0 1 $24.00079-594-18 R 0 1 $24.00079-594-19 R 0 1 $24.00 Landuse Key: C - Commercial M - Multi-Family Residential R - Single Family Residential (incl. Condos) T - Mobile Homes V - Vacant

EXHIBIT A

Page 14 of 160 ends

APN LANDUSE ACRES DU'S TAX APN LANDUSE ACRES DU'S TAX
CITY OF STANTON PROTECTIVE SERVICES TAX - FY 2025-26

PRELIMINARY TAX ROLL

Page 14 ends

079-594-20 R 0 1 $24.00
079-594-21 R 0 1 $24.00
079-594-22 R 0 1 $24.00079-594-23 R 0 1 $24.00079-594-24 R 0 1 $24.00079-594-25 R 0 1 $24.00079-594-26 R 0 1 $24.00079-595-01 R 0 1 $24.00079-595-02 R 0 1 $24.00079-595-03 R 0 1 $24.00079-595-04 R 0 1 $24.00079-595-05 R 0 1 $24.00079-595-06 R 0 1 $24.00079-595-07 R 0 1 $24.00079-595-08 R 0 1 $24.00079-595-09 R 0 1 $24.00079-595-10 R 0 1 $24.00079-595-11 R 0 1 $24.00079-595-12 R 0 1 $24.00079-595-13 R 0 1 $24.00079-595-14 R 0 1 $24.00079-595-15 R 0 1 $24.00 079-596-01 R 0 1 $24.00079-596-02 R 0 1 $24.00079-596-03 R 0 1 $24.00079-596-04 R 0 1 $24.00079-596-05 R 0 1 $24.00079-596-06 R 0 1 $24.00079-596-07 R 0 1 $24.00079-596-08 R 0 1 $24.00079-596-09 R 0 1 $24.00079-596-10 R 0 1 $24.00079-596-11 R 0 1 $24.00079-596-12 R 0 1 $24.00079-596-13 R 0 1 $24.00079-596-14 R 0 1 $24.00079-601-07 R 0 1 $24.00079-601-08 R 0 1 $24.00079-601-09 R 0 1 $24.00079-601-10 R 0 1 $24.00079-601-11 R 0 1 $24.00079-601-12 R 0 1 $24.00079-601-13 R 0 1 $24.00079-601-14 R 0 1 $24.00 Landuse Key: C - Commercial M - Multi-Family Residential R - Single Family Residential (incl. Condos) T - Mobile Homes V - Vacant

EXHIBIT A

Page 15 of 160 ends

APN LANDUSE ACRES DU'S TAX APN LANDUSE ACRES DU'S TAX
CITY OF STANTON PROTECTIVE SERVICES TAX - FY 2025-26

PRELIMINARY TAX ROLL

Page 15 ends

079-601-15 R 0 1 $24.00
079-601-16 R 0 1 $24.00
079-601-17 R 0 1 $24.00079-601-18 R 0 1 $24.00079-601-19 R 0 1 $24.00079-601-20 R 0 1 $24.00079-601-21 R 0 1 $24.00079-601-22 R 0 1 $24.00079-601-23 R 0 1 $24.00079-601-24 R 0 1 $24.00079-601-27 C 0.81 0 $243.00 079-601-29 C 0.42 0 $126.00
079-601-30 C 0.24 1 $72.00
079-601-31 M 2.08 40 $960.00079-602-01 R 0 1 $24.00079-602-02 R 0 1 $24.00079-602-03 R 0 1 $24.00079-602-04 R 0 1 $24.00079-602-05 R 0 1 $24.00079-602-06 R 0 1 $24.00079-602-07 R 0 1 $24.00079-602-08 R 0 1 $24.00 079-602-09 R 0 1 $24.00
079-602-10 R 0 1 $24.00079-602-11 R 0 1 $24.00079-602-12 R 0 1 $24.00079-602-13 R 0 1 $24.00079-602-14 R 0 1 $24.00079-602-15 R 0 1 $24.00079-602-16 R 0 1 $24.00079-602-17 R 0 1 $24.00079-602-18 R 0 1 $24.00079-602-19 R 0 1 $24.00079-602-20 R 0 1 $24.00079-602-21 R 0 1 $24.00079-602-22 R 0 1 $24.00079-602-23 R 0 1 $24.00079-602-24 R 0 1 $24.00079-602-25 R 0 1 $24.00079-602-26 R 0 1 $24.00079-602-27 R 0 1 $24.00079-602-28 R 0 1 $24.00079-602-29 R 0 1 $24.00079-602-30 R 0 1 $24.00 Landuse Key: C - Commercial M - Multi-Family Residential R - Single Family Residential (incl. Condos) T - Mobile Homes V - Vacant

EXHIBIT A

Page 16 of 160 ends

APN LANDUSE ACRES DU'S TAX APN LANDUSE ACRES DU'S TAX
CITY OF STANTON PROTECTIVE SERVICES TAX - FY 2025-26

PRELIMINARY TAX ROLL

Page 16 ends

079-602-31 R 0 1 $24.00
079-741-01 R 0 1 $24.00
079-741-02 R 0 1 $24.00079-741-03 R 0 1 $24.00079-741-04 R 0 1 $24.00079-741-05 R 0 1 $24.00079-741-06 R 0 1 $24.00079-741-07 R 0 1 $24.00127-462-02 M 0.23 8 $192.00 127-462-03 M 0.23 8 $192.00
127-462-04 M 0.23 8 $192.00
127-462-05 M 0.23 8 $192.00
127-462-06 C 0.49 0 $147.00
127-462-07 C 0.27 0 $81.00
127-462-08 C 0.25 0 $75.00
127-462-09 C 0.16 0 $48.00
127-462-10 M 0.23 8 $192.00
127-462-11 M 0.23 8 $192.00
127-462-12 M 0.23 8 $192.00
127-462-13 M 0.23 8 $192.00
127-462-14 M 0.23 8 $192.00
127-463-08 R 0 1 $24.00
127-621-02 M 2.03 31 $744.00
079-741-08 R 0 1 $24.00
079-741-09 R 0 1 $24.00079-741-10 R 0 1 $24.00079-741-11 R 0 1 $24.00079-741-12 R 0 1 $24.00079-741-13 R 0 1 $24.00079-741-14 R 0 1 $24.00079-741-15 R 0 1 $24.00079-741-16 R 0 1 $24.00079-741-17 R 0 1 $24.00079-741-18 R 0 1 $24.00079-741-19 R 0 1 $24.00079-741-20 R 0 1 $24.00079-741-21 R 0 1 $24.00079-741-23 M 0.24 2 $48.00 079-742-01 R 0 1 $24.00
079-742-02 R 0 1 $24.00079-742-03 R 0 1 $24.00079-742-04 R 0 1 $24.00079-742-05 R 0 1 $24.00079-742-06 R 0 1 $24.00 Landuse Key: C - Commercial M - Multi-Family Residential R - Single Family Residential (incl. Condos) T - Mobile Homes V - Vacant

EXHIBIT A

Page 17 of 160 ends

APN LANDUSE ACRES DU'S TAX APN LANDUSE ACRES DU'S TAX
CITY OF STANTON PROTECTIVE SERVICES TAX - FY 2025-26

PRELIMINARY TAX ROLL

Page 17 ends

079-742-07 R 0 1 $24.00
079-742-08 R 0 1 $24.00
079-742-09 R 0 1 $24.00079-742-10 R 0 1 $24.00079-742-11 R 0 1 $24.00079-742-12 R 0 1 $24.00079-742-13 R 0 1 $24.00079-742-14 R 0 1 $24.00079-742-15 R 0 1 $24.00079-742-16 R 0 1 $24.00079-742-17 R 0 1 $24.00079-742-18 R 0 1 $24.00079-742-19 R 0 1 $24.00079-742-20 R 0 1 $24.00079-742-21 R 0 1 $24.00079-742-22 R 0 1 $24.00079-742-23 R 0 1 $24.00079-742-24 R 0 1 $24.00079-742-25 R 0 1 $24.00079-742-26 R 0 1 $24.00079-742-27 R 0 1 $24.00079-742-28 R 0 1 $24.00 079-742-29 R 0 1 $24.00079-742-30 R 0 1 $24.00079-742-31 R 0 1 $24.00079-742-32 R 0 1 $24.00079-742-33 R 0 1 $24.00079-742-34 R 0 1 $24.00079-742-35 R 0 1 $24.00079-742-36 R 0 1 $24.00079-742-37 R 0 1 $24.00079-742-38 R 0 1 $24.00079-742-39 R 0 1 $24.00079-742-40 R 0 1 $24.00079-742-41 R 0 1 $24.00079-742-42 R 0 1 $24.00079-742-43 R 0 1 $24.00079-742-44 R 0 1 $24.00079-742-45 R 0 1 $24.00079-742-46 R 0 1 $24.00079-742-47 R 0 1 $24.00079-742-48 R 0 1 $24.00079-742-49 R 0 1 $24.00079-742-50 R 0 1 $24.00 Landuse Key: C - Commercial M - Multi-Family Residential R - Single Family Residential (incl. Condos) T - Mobile Homes V - Vacant

EXHIBIT A

Page 18 of 160 ends

APN LANDUSE ACRES DU'S TAX APN LANDUSE ACRES DU'S TAX
CITY OF STANTON PROTECTIVE SERVICES TAX - FY 2025-26

PRELIMINARY TAX ROLL

Page 18 ends

079-742-51 R 0 1 $24.00
079-742-52 R 0 1 $24.00
079-742-53 R 0 1 $24.00079-742-54 R 0 1 $24.00079-742-55 R 0 1 $24.00079-743-01 R 0 1 $24.00079-743-02 R 0 1 $24.00079-743-03 R 0 1 $24.00079-743-04 R 0 1 $24.00079-743-05 R 0 1 $24.00079-744-01 R 0 1 $24.00079-744-02 R 0 1 $24.00079-744-03 R 0 1 $24.00079-744-04 R 0 1 $24.00079-744-05 R 0 1 $24.00079-744-06 R 0 1 $24.00079-744-07 R 0 1 $24.00079-744-08 R 0 1 $24.00079-744-09 R 0 1 $24.00079-744-10 R 0 1 $24.00079-744-11 R 0 1 $24.00079-744-12 R 0 1 $24.00 079-744-13 R 0 1 $24.00079-744-14 R 0 1 $24.00079-744-15 R 0 1 $24.00079-744-16 R 0 1 $24.00079-744-17 R 0 1 $24.00079-744-18 R 0 1 $24.00079-744-19 R 0 1 $24.00079-744-20 R 0 1 $24.00079-744-21 R 0 1 $24.00079-744-22 R 0 1 $24.00079-751-01 C 1.69 0 $507.00 079-751-02 C 0.47 0 $141.00
079-751-05 M 0.7 2 $48.00079-751-11 C 0.47 0 $141.00
079-751-13 R 0.47 1 $24.00
079-751-17 R 0 1 $24.00079-751-18 R 0 1 $24.00079-751-19 R 0 1 $24.00079-751-20 R 0 1 $24.00079-751-21 R 0 1 $24.00079-751-22 R 0 1 $24.00079-751-23 R 0 1 $24.00 Landuse Key: C - Commercial M - Multi-Family Residential R - Single Family Residential (incl. Condos) T - Mobile Homes V - Vacant

EXHIBIT A

Page 19 of 160 ends

APN LANDUSE ACRES DU'S TAX APN LANDUSE ACRES DU'S TAX
CITY OF STANTON PROTECTIVE SERVICES TAX - FY 2025-26

PRELIMINARY TAX ROLL

Page 19 ends

079-751-24 R 0 1 $24.00
079-751-25 R 0 1 $24.00
079-751-26 R 0 1 $24.00079-751-27 R 0 1 $24.00079-751-28 R 0 1 $24.00079-751-29 C 0.47 0 $141.00 079-751-30 C 0.47 0 $141.00
079-752-01 C 0.16 0 $48.00
079-752-02 C 0.17 0 $51.00
079-752-03 R 0 1 $24.00079-752-04 R 0 1 $24.00079-752-05 R 0 1 $24.00079-752-06 C 0.41 0 $123.00 079-752-07 V 0.05 1 $3.75
079-752-09 R 0 1 $24.00079-752-17 R 0 1 $24.00079-753-01 R 0.1 1 $24.00 079-753-02 R 0.08 1 $24.00
079-753-03 R 0.08 1 $24.00
079-753-04 R 0.08 1 $24.00
079-753-05 R 0.12 1 $24.00
079-753-06 R 0.08 1 $24.00
079-753-07 R 0.08 1 $24.00
079-753-08 R 0.08 1 $24.00
079-753-09 R 0.08 1 $24.00
079-753-10 R 0.08 1 $24.00
079-753-11 R 0.08 1 $24.00
079-753-12 R 0.11 1 $24.00
079-753-13 R 0.09 1 $24.00
079-753-14 R 0.07 1 $24.00
079-753-15 R 0.07 1 $24.00
079-753-16 R 0.07 1 $24.00
079-753-17 R 0.07 1 $24.00
079-753-18 R 0.07 1 $24.00
079-753-19 R 0.07 1 $24.00
079-753-20 R 0.07 1 $24.00
079-753-25 R 0 1 $24.00079-753-26 R 0 1 $24.00079-753-27 R 0 1 $24.00079-753-28 R 0 1 $24.00079-753-29 R 0 1 $24.00079-753-30 R 0 1 $24.00079-753-31 R 0 1 $24.00079-753-32 R 0 1 $24.00 Landuse Key: C - Commercial M - Multi-Family Residential R - Single Family Residential (incl. Condos) T - Mobile Homes V - Vacant

EXHIBIT A

Page 20 of 160 ends

APN LANDUSE ACRES DU'S TAX APN LANDUSE ACRES DU'S TAX
CITY OF STANTON PROTECTIVE SERVICES TAX - FY 2025-26

PRELIMINARY TAX ROLL

Page 20 ends

079-753-33 R 0 1 $24.00
079-753-34 R 0 1 $24.00
079-753-35 R 0 1 $24.00079-753-36 R 0 1 $24.00079-753-37 R 0 1 $24.00079-753-38 R 0 1 $24.00079-753-39 R 0 1 $24.00079-753-40 R 0 1 $24.00079-753-41 R 0 1 $24.00079-753-42 R 0 1 $24.00079-753-43 R 0 1 $24.00079-753-44 R 0 1 $24.00079-753-45 R 0 1 $24.00079-761-02 R 0 1 $24.00079-761-03 R 0 1 $24.00079-761-04 R 0 1 $24.00079-761-05 R 0 1 $24.00079-761-06 R 0 1 $24.00079-761-07 R 0 1 $24.00079-761-08 R 0 1 $24.00079-761-09 R 0 1 $24.00079-761-10 R 0 1 $24.00 079-761-11 R 0 1 $24.00079-761-12 R 0 1 $24.00079-761-13 R 0 1 $24.00079-761-14 R 0 1 $24.00079-761-15 R 0 1 $24.00079-761-16 R 0 1 $24.00079-761-17 R 0 1 $24.00079-761-18 R 0 1 $24.00079-761-19 R 0 1 $24.00079-761-20 R 0 1 $24.00079-761-21 R 0 1 $24.00079-761-22 R 0 1 $24.00079-761-23 R 0 1 $24.00079-761-24 R 0 1 $24.00079-761-25 R 0 1 $24.00079-762-06 R 0 1 $24.00079-762-07 R 0 1 $24.00079-762-08 R 0 1 $24.00079-762-09 R 0 1 $24.00079-762-10 R 0 1 $24.00079-762-11 R 0 1 $24.00079-762-12 R 0 1 $24.00 Landuse Key: C - Commercial M - Multi-Family Residential R - Single Family Residential (incl. Condos) T - Mobile Homes V - Vacant

EXHIBIT A

Page 21 of 160 ends

APN LANDUSE ACRES DU'S TAX APN LANDUSE ACRES DU'S TAX
CITY OF STANTON PROTECTIVE SERVICES TAX - FY 2025-26

PRELIMINARY TAX ROLL

Page 21 ends

079-762-13 R 0 1 $24.00
079-762-14 R 0 1 $24.00
079-762-15 R 0 1 $24.00079-762-16 R 0 1 $24.00079-762-17 R 0 1 $24.00079-762-18 R 0 1 $24.00079-762-19 R 0 1 $24.00079-762-20 R 0 1 $24.00079-762-21 R 0 1 $24.00079-762-22 C 2.95 82 $885.00 079-762-23 C 0.82 0 $246.00
079-762-24 V 0.47 0 $35.25
079-762-32 C 0.1 0 $30.00
079-762-35 C 0.47 0 $141.00
079-762-36 C 0.59 0 $177.00
079-762-56 R 0 1 $24.00079-762-57 R 0 1 $24.00079-762-58 R 0 1 $24.00079-762-59 R 0 1 $24.00079-762-60 R 0 1 $24.00079-762-62 C 0.97 0 $291.00 079-762-63 C 0.86 0 $258.00
079-762-64 C 2.16 0 $648.00
079-771-08 R 0 1 $24.00
079-771-09 R 0 1 $24.00079-771-10 R 0 1 $24.00079-771-11 R 0 1 $24.00079-771-12 R 0 1 $24.00079-771-13 R 0 1 $24.00079-771-14 R 0 1 $24.00079-771-15 R 0 1 $24.00079-771-16 R 0 1 $24.00079-771-17 R 0 1 $24.00079-771-18 R 0 1 $24.00079-771-19 R 0 1 $24.00079-771-20 R 0 1 $24.00079-771-21 R 0 1 $24.00079-771-22 R 0 1 $24.00079-771-23 R 0 1 $24.00079-771-24 R 0 1 $24.00079-771-25 R 0 1 $24.00079-771-26 R 0 1 $24.00079-771-27 R 0 1 $24.00079-771-39 M 1.82 28 $672.00 Landuse Key: C - Commercial M - Multi-Family Residential R - Single Family Residential (incl. Condos) T - Mobile Homes V - Vacant

EXHIBIT A

Page 22 of 160 ends

APN LANDUSE ACRES DU'S TAX APN LANDUSE ACRES DU'S TAX
CITY OF STANTON PROTECTIVE SERVICES TAX - FY 2025-26

PRELIMINARY TAX ROLL

Page 22 ends

079-771-51 R 0 1 $24.00
079-771-52 R 0 1 $24.00
079-771-53 R 0 1 $24.00079-771-54 R 0 1 $24.00079-771-55 R 0 1 $24.00079-771-56 R 0 1 $24.00079-771-57 R 0 1 $24.00079-771-58 R 0 1 $24.00079-771-59 R 0 1 $24.00079-772-01 R 0 1 $24.00079-772-02 R 0 1 $24.00079-772-03 R 0 1 $24.00079-772-04 R 0 1 $24.00079-772-05 R 0 1 $24.00079-772-06 R 0 1 $24.00079-772-07 R 0 1 $24.00079-772-08 R 0 1 $24.00079-772-09 R 0 1 $24.00079-772-10 R 0 1 $24.00079-772-11 R 0 1 $24.00079-772-12 R 0 1 $24.00079-772-13 R 0 1 $24.00 079-772-14 R 0 1 $24.00079-772-15 R 0 1 $24.00079-772-16 R 0 1 $24.00079-772-17 R 0 1 $24.00079-772-18 R 0 1 $24.00079-772-19 R 0 1 $24.00079-772-20 R 0 1 $24.00079-772-21 R 0 1 $24.00079-772-22 R 0 1 $24.00079-772-23 R 0 1 $24.00079-772-24 R 0 1 $24.00079-772-25 R 0 1 $24.00079-772-26 R 0 1 $24.00079-772-27 R 0 1 $24.00079-772-28 R 0 1 $24.00079-772-29 R 0 1 $24.00079-772-30 R 0 1 $24.00079-772-31 R 0 1 $24.00079-772-32 R 0 1 $24.00079-772-33 R 0 1 $24.00079-772-34 R 0 1 $24.00079-772-35 R 0 1 $24.00 Landuse Key: C - Commercial M - Multi-Family Residential R - Single Family Residential (incl. Condos) T - Mobile Homes V - Vacant

EXHIBIT A

Page 23 of 160 ends

APN LANDUSE ACRES DU'S TAX APN LANDUSE ACRES DU'S TAX
CITY OF STANTON PROTECTIVE SERVICES TAX - FY 2025-26

PRELIMINARY TAX ROLL

Page 23 ends

079-772-36 R 0 1 $24.00
079-772-37 R 0 1 $24.00
079-772-38 R 0 1 $24.00079-772-40 R 0 1 $24.00079-772-41 R 0.08 1 $24.00 079-772-42 R 0.08 1 $24.00
079-772-43 R 0.08 1 $24.00
079-772-44 R 0.08 1 $24.00
079-772-45 R 0.08 1 $24.00
079-772-46 R 0.08 1 $24.00
079-772-47 R 0.07 1 $24.00
079-772-48 R 0.07 1 $24.00
079-772-49 R 0.07 1 $24.00
079-772-50 R 0.07 1 $24.00
079-772-51 R 0.07 1 $24.00
079-772-52 R 0.07 1 $24.00
079-772-53 R 0.07 1 $24.00
079-781-01 R 0 1 $24.00079-781-02 R 0 1 $24.00079-781-03 R 0 1 $24.00079-781-04 R 0 1 $24.00079-781-05 R 0 1 $24.00 079-781-06 R 0 1 $24.00
079-781-07 R 0 1 $24.00079-781-08 R 0 1 $24.00079-781-09 R 0 1 $24.00079-781-10 R 0 1 $24.00079-781-11 R 0 1 $24.00079-781-12 R 0 1 $24.00079-781-13 R 0 1 $24.00079-781-14 R 0 1 $24.00079-781-15 R 0 1 $24.00079-781-16 R 0 1 $24.00079-781-17 R 0 1 $24.00079-781-18 R 0 1 $24.00079-781-19 R 0 1 $24.00079-781-20 R 0 1 $24.00079-781-21 R 0 1 $24.00079-781-22 R 0 1 $24.00079-781-23 R 0 1 $24.00079-781-24 R 0 1 $24.00079-781-25 R 0 1 $24.00079-781-26 R 0 1 $24.00079-781-27 R 0 1 $24.00 Landuse Key: C - Commercial M - Multi-Family Residential R - Single Family Residential (incl. Condos) T - Mobile Homes V - Vacant

EXHIBIT A

Page 24 of 160 ends

APN LANDUSE ACRES DU'S TAX APN LANDUSE ACRES DU'S TAX
CITY OF STANTON PROTECTIVE SERVICES TAX - FY 2025-26

PRELIMINARY TAX ROLL

Page 24 ends

079-781-28 R 0 1 $24.00
079-781-29 R 0 1 $24.00
079-781-30 R 0 1 $24.00079-781-31 R 0 1 $24.00079-781-32 R 0 1 $24.00079-782-01 R 0 1 $24.00079-782-02 R 0 1 $24.00079-782-03 R 0 1 $24.00079-782-04 R 0 1 $24.00079-782-05 R 0 1 $24.00079-782-06 R 0 1 $24.00079-782-07 R 0 1 $24.00079-782-08 R 0 1 $24.00079-782-09 R 0 1 $24.00079-782-10 R 0 1 $24.00079-782-11 R 0 1 $24.00079-782-12 R 0 1 $24.00079-782-14 R 0 1 $24.00079-782-15 R 0 1 $24.00079-782-16 R 0 1 $24.00079-782-17 R 0 1 $24.00079-782-18 R 0 1 $24.00 079-782-19 R 0 1 $24.00079-783-01 R 0 1 $24.00079-783-02 R 0 1 $24.00079-783-03 R 0 1 $24.00079-783-04 R 0 1 $24.00079-783-05 R 0 1 $24.00079-783-06 R 0 1 $24.00079-783-07 R 0 1 $24.00079-783-08 R 0 1 $24.00079-783-09 R 0 1 $24.00079-783-10 R 0 1 $24.00079-783-11 R 0 1 $24.00079-783-12 R 0 1 $24.00079-783-13 R 0 1 $24.00079-783-14 R 0 1 $24.00079-783-15 R 0 1 $24.00079-783-16 R 0 1 $24.00079-783-17 R 0 1 $24.00079-783-18 R 0 1 $24.00079-783-19 R 0 1 $24.00079-783-20 R 0 1 $24.00079-783-22 R 0 1 $24.00 Landuse Key: C - Commercial M - Multi-Family Residential R - Single Family Residential (incl. Condos) T - Mobile Homes V - Vacant

EXHIBIT A

Page 25 of 160 ends

APN LANDUSE ACRES DU'S TAX APN LANDUSE ACRES DU'S TAX
CITY OF STANTON PROTECTIVE SERVICES TAX - FY 2025-26

PRELIMINARY TAX ROLL

Page 25 ends

079-783-23 R 0 1 $24.00
079-784-01 R 0 1 $24.00
079-784-02 R 0 1 $24.00079-784-03 R 0 1 $24.00079-784-04 R 0 1 $24.00079-784-05 R 0 1 $24.00079-784-06 R 0 1 $24.00079-784-07 R 0 1 $24.00079-784-08 R 0 1 $24.00079-784-09 R 0 1 $24.00079-784-10 R 0 1 $24.00079-784-11 R 0 1 $24.00079-784-12 R 0 1 $24.00079-784-13 R 0 1 $24.00079-784-14 R 0 1 $24.00079-784-15 R 0 1 $24.00079-784-16 R 0 1 $24.00079-784-17 R 0 1 $24.00079-784-18 R 0 1 $24.00079-784-19 R 0 1 $24.00079-784-20 R 0 1 $24.00079-901-01 R 0 1 $24.00 079-901-02 R 0 1 $24.00079-901-03 R 0 1 $24.00079-901-04 R 0 1 $24.00079-901-05 R 0 1 $24.00079-901-06 R 0 1 $24.00079-901-07 R 0 1 $24.00079-901-08 R 0 1 $24.00079-901-09 R 0 1 $24.00079-901-10 R 0 1 $24.00079-901-11 R 0 1 $24.00079-901-12 R 0 1 $24.00079-901-13 R 0 1 $24.00079-901-14 R 0 1 $24.00079-901-15 R 0 1 $24.00079-901-16 R 0 1 $24.00079-901-17 R 0 1 $24.00079-901-18 R 0 1 $24.00079-901-19 R 0 1 $24.00079-901-20 R 0 1 $24.00079-901-21 R 0 1 $24.00079-901-22 R 0 1 $24.00079-901-23 R 0 1 $24.00 Landuse Key: C - Commercial M - Multi-Family Residential R - Single Family Residential (incl. Condos) T - Mobile Homes V - Vacant

EXHIBIT A

Page 26 of 160 ends

APN LANDUSE ACRES DU'S TAX APN LANDUSE ACRES DU'S TAX
CITY OF STANTON PROTECTIVE SERVICES TAX - FY 2025-26

PRELIMINARY TAX ROLL

Page 26 ends

079-901-24 R 0 1 $24.00
079-901-25 R 0 1 $24.00
079-901-26 R 0 1 $24.00079-901-27 R 0 1 $24.00079-901-28 R 0 1 $24.00079-901-29 R 0 1 $24.00079-901-30 R 0 1 $24.00079-901-33 C 0.5 0 $150.00 079-901-37 M 8.06 194 $4,656.00079-901-38 M 1.3 21 $504.00079-902-01 R 0 1 $24.00079-902-02 R 0 1 $24.00079-902-03 R 0 1 $24.00079-902-04 R 0 1 $24.00079-902-05 R 0 1 $24.00079-902-06 R 0 1 $24.00079-902-07 R 0 1 $24.00079-902-08 R 0 1 $24.00079-902-09 R 0 1 $24.00079-902-10 R 0 1 $24.00079-902-11 R 0 1 $24.00079-902-12 R 0 1 $24.00 079-921-01 R 0 1 $24.00079-921-02 R 0 1 $24.00079-921-03 R 0 1 $24.00079-921-04 R 0 1 $24.00079-921-05 R 0 1 $24.00079-921-06 R 0 1 $24.00079-921-07 R 0 1 $24.00079-921-08 R 0 1 $24.00079-921-09 R 0 1 $24.00079-921-10 R 0 1 $24.00079-921-11 R 0 1 $24.00079-921-12 R 0 1 $24.00079-921-13 R 0 1 $24.00079-921-14 R 0 1 $24.00079-921-15 R 0 1 $24.00079-921-16 R 0 1 $24.00079-921-17 R 0 1 $24.00079-921-18 R 0 1 $24.00079-921-19 R 0 1 $24.00079-921-20 R 0 1 $24.00079-921-21 R 0 1 $24.00079-921-22 R 0 1 $24.00 Landuse Key: C - Commercial M - Multi-Family Residential R - Single Family Residential (incl. Condos) T - Mobile Homes V - Vacant

EXHIBIT A

Page 27 of 160 ends

APN LANDUSE ACRES DU'S TAX APN LANDUSE ACRES DU'S TAX
CITY OF STANTON PROTECTIVE SERVICES TAX - FY 2025-26

PRELIMINARY TAX ROLL

Page 27 ends

079-921-23 R 0 1 $24.00
079-921-24 R 0 1 $24.00
079-921-25 R 0 1 $24.00079-921-26 R 0 1 $24.00079-921-27 R 0 1 $24.00079-921-28 R 0 1 $24.00079-921-29 R 0 1 $24.00079-921-30 R 0 1 $24.00079-921-31 R 0 1 $24.00079-921-32 R 0 1 $24.00079-921-33 R 0 1 $24.00079-921-34 R 0 1 $24.00079-921-35 R 0 1 $24.00079-921-36 R 0 1 $24.00079-921-37 R 0 1 $24.00079-921-38 R 0 1 $24.00079-921-39 R 0 1 $24.00079-921-40 R 0 1 $24.00079-921-41 R 0 1 $24.00079-921-42 R 0 1 $24.00079-921-43 R 0 1 $24.00079-921-44 R 0 1 $24.00 079-921-45 R 0 1 $24.00079-921-46 R 0 1 $24.00079-921-47 R 0 1 $24.00079-921-48 R 0 1 $24.00079-921-49 R 0 1 $24.00079-921-50 R 0 1 $24.00079-921-51 R 0 1 $24.00079-921-52 R 0 1 $24.00079-921-53 R 0 1 $24.00079-921-54 R 0 1 $24.00079-921-55 R 0 1 $24.00079-921-56 R 0 1 $24.00079-921-57 R 0 1 $24.00079-921-58 R 0 1 $24.00079-921-59 R 0 1 $24.00079-921-60 R 0 1 $24.00079-921-61 R 0 1 $24.00079-921-62 R 0 1 $24.00079-921-63 R 0 1 $24.00079-921-64 R 0 1 $24.00079-921-65 R 0 1 $24.00079-921-66 R 0 1 $24.00 Landuse Key: C - Commercial M - Multi-Family Residential R - Single Family Residential (incl. Condos) T - Mobile Homes V - Vacant

EXHIBIT A

Page 28 of 160 ends

APN LANDUSE ACRES DU'S TAX APN LANDUSE ACRES DU'S TAX
CITY OF STANTON PROTECTIVE SERVICES TAX - FY 2025-26

PRELIMINARY TAX ROLL

Page 28 ends

079-922-01 R 0 1 $24.00
079-922-02 R 0 1 $24.00
079-922-03 R 0 1 $24.00079-922-49 R 0 1 $24.00079-922-50 R 0 1 $24.00079-922-51 R 0 1 $24.00079-922-52 R 0 1 $24.00079-922-53 R 0 1 $24.00079-922-54 R 0 1 $24.00079-922-55 R 0 1 $24.00079-922-56 R 0 1 $24.00079-922-57 R 0 1 $24.00079-922-58 R 0 1 $24.00079-922-59 R 0 1 $24.00079-922-60 R 0 1 $24.00079-922-61 R 0 1 $24.00079-922-62 R 0 1 $24.00079-922-63 R 0 1 $24.00079-922-64 R 0 1 $24.00079-922-65 R 0 1 $24.00079-922-66 R 0 1 $24.00079-931-34 R 0 1 $24.00 079-931-35 R 0 1 $24.00079-931-36 R 0 1 $24.00079-931-37 R 0 1 $24.00079-931-38 R 0 1 $24.00079-931-39 R 0 1 $24.00079-931-40 R 0 1 $24.00079-931-41 R 0 1 $24.00079-931-42 R 0 1 $24.00079-931-43 R 0 1 $24.00079-931-44 R 0 1 $24.00079-931-45 R 0 1 $24.00079-931-46 R 0 1 $24.00079-931-47 R 0 1 $24.00079-931-48 R 0 1 $24.00079-931-49 R 0 1 $24.00079-931-50 R 0 1 $24.00079-932-01 R 0 1 $24.00079-932-02 R 0 1 $24.00079-932-03 R 0 1 $24.00079-932-04 R 0 1 $24.00079-932-05 R 0 1 $24.00079-932-06 R 0 1 $24.00 Landuse Key: C - Commercial M - Multi-Family Residential R - Single Family Residential (incl. Condos) T - Mobile Homes V - Vacant

EXHIBIT A

Page 29 of 160 ends

APN LANDUSE ACRES DU'S TAX APN LANDUSE ACRES DU'S TAX
CITY OF STANTON PROTECTIVE SERVICES TAX - FY 2025-26

PRELIMINARY TAX ROLL

Page 29 ends

079-932-07 R 0 1 $24.00
079-932-08 R 0 1 $24.00
079-932-09 R 0 1 $24.00079-932-10 R 0 1 $24.00079-932-11 R 0 1 $24.00079-932-12 R 0 1 $24.00079-932-13 R 0 1 $24.00079-932-14 R 0 1 $24.00079-932-15 R 0 1 $24.00079-932-16 R 0 1 $24.00079-932-17 R 0 1 $24.00079-932-18 R 0 1 $24.00079-932-19 R 0 1 $24.00079-932-20 R 0 1 $24.00079-932-21 R 0 1 $24.00079-932-22 R 0 1 $24.00079-932-23 R 0 1 $24.00079-932-24 R 0 1 $24.00079-932-25 R 0 1 $24.00079-932-26 R 0 1 $24.00079-932-27 R 0 1 $24.00079-932-28 R 0 1 $24.00 079-932-29 R 0 1 $24.00079-932-30 R 0 1 $24.00079-932-31 R 0 1 $24.00079-932-32 R 0 1 $24.00079-932-33 R 0 1 $24.00079-932-34 R 0 1 $24.00079-932-35 R 0 1 $24.00079-932-36 R 0 1 $24.00079-932-37 R 0 1 $24.00079-932-38 R 0 1 $24.00079-932-39 R 0 1 $24.00079-932-40 R 0 1 $24.00079-932-41 R 0 1 $24.00079-932-42 R 0 1 $24.00079-932-43 R 0 1 $24.00079-932-44 R 0 1 $24.00079-932-45 R 0 1 $24.00079-932-46 R 0 1 $24.00079-933-01 R 0 1 $24.00079-933-02 R 0 1 $24.00079-933-03 R 0 1 $24.00079-933-04 R 0 1 $24.00 Landuse Key: C - Commercial M - Multi-Family Residential R - Single Family Residential (incl. Condos) T - Mobile Homes V - Vacant

EXHIBIT A

Page 30 of 160 ends

APN LANDUSE ACRES DU'S TAX APN LANDUSE ACRES DU'S TAX
CITY OF STANTON PROTECTIVE SERVICES TAX - FY 2025-26

PRELIMINARY TAX ROLL

Page 30 ends

079-933-05 R 0 1 $24.00
079-933-06 R 0 1 $24.00
079-933-07 R 0 1 $24.00079-933-08 R 0 1 $24.00079-933-09 R 0 1 $24.00079-933-10 R 0 1 $24.00079-933-11 R 0 1 $24.00079-933-12 R 0 1 $24.00079-933-13 R 0 1 $24.00079-933-14 R 0 1 $24.00079-933-15 R 0 1 $24.00079-933-16 R 0 1 $24.00079-933-17 R 0 1 $24.00079-933-18 R 0 1 $24.00079-933-19 R 0 1 $24.00079-933-20 R 0 1 $24.00079-933-21 R 0 1 $24.00079-933-22 R 0 1 $24.00079-933-23 R 0 1 $24.00079-933-24 R 0 1 $24.00079-933-25 R 0 1 $24.00079-933-26 R 0 1 $24.00 079-933-27 R 0 1 $24.00079-933-28 R 0 1 $24.00079-933-29 R 0 1 $24.00079-933-30 R 0 1 $24.00079-933-31 R 0 1 $24.00079-933-32 R 0 1 $24.00079-933-33 R 0 1 $24.00079-933-34 R 0 1 $24.00079-933-35 R 0 1 $24.00079-933-36 R 0 1 $24.00079-933-37 R 0 1 $24.00079-933-38 R 0 1 $24.00079-933-39 R 0 1 $24.00079-933-40 R 0 1 $24.00079-933-41 R 0 1 $24.00079-933-42 R 0 1 $24.00079-933-43 R 0 1 $24.00079-933-44 R 0 1 $24.00126-281-01 C 0.33 0 $99.00 126-281-05 C 0.58 0 $174.00
126-281-06 C 0.58 0 $174.00
126-281-07 C 0.58 0 $174.00
Landuse Key: C - Commercial M - Multi-Family Residential R - Single Family Residential (incl. Condos) T - Mobile Homes V - Vacant

EXHIBIT A

Page 31 of 160 ends

APN LANDUSE ACRES DU'S TAX APN LANDUSE ACRES DU'S TAX
CITY OF STANTON PROTECTIVE SERVICES TAX - FY 2025-26

PRELIMINARY TAX ROLL

Page 31 ends

126-281-08 R 0.58 1 $24.00
126-281-09 M 0.58 4 $96.00
126-281-10 R 0.58 1 $24.00
126-281-11 R 0.58 1 $24.00
126-281-14 R 0.58 1 $24.00
126-281-15 R 0.15 1 $24.00
126-281-16 R 0.15 1 $24.00
126-281-17 R 0.27 1 $24.00
126-281-18 R 0.58 1 $24.00
126-281-22 C 0.57 0 $171.00
126-281-23 C 1.71 0 $513.00
126-282-11 C 0.58 1 $174.00
126-282-14 R 0.41 1 $24.00
126-282-16 C 0.91 0 $273.00
126-282-17 R 0.18 1 $24.00
126-282-18 R 0.18 1 $24.00
126-282-19 R 0.18 1 $24.00
126-282-20 R 0.18 1 $24.00
126-283-01 R 0.06 1 $24.00
126-283-02 R 0.06 1 $24.00
126-283-03 R 0.06 1 $24.00
126-283-04 R 0.06 1 $24.00
126-283-05 R 0 1 $24.00
126-283-06 R 0 1 $24.00126-283-07 R 0.06 1 $24.00
126-283-08 R 0.06 1 $24.00
126-283-09 R 0.06 1 $24.00
126-283-10 R 0.06 1 $24.00
126-283-11 R 0.06 1 $24.00
126-283-12 R 0.06 1 $24.00
126-283-13 R 0.05 1 $24.00
126-283-14 R 0.05 1 $24.00
126-283-15 R 0.05 1 $24.00
126-283-16 R 0.05 1 $24.00
126-283-17 R 0 1 $24.00126-283-18 R 0 1 $24.00126-283-19 R 0.05 1 $24.00 126-283-20 R 0.05 1 $24.00
126-283-21 R 0.05 1 $24.00
126-283-22 R 0.05 1 $24.00
126-283-23 R 0.05 1 $24.00
126-283-24 R 0.05 1 $24.00
126-283-25 R 0.05 1 $24.00
126-283-26 R 0.05 1 $24.00
Landuse Key: C - Commercial M - Multi-Family Residential R - Single Family Residential (incl. Condos) T - Mobile Homes V - Vacant

EXHIBIT A

Page 32 of 160 ends

APN LANDUSE ACRES DU'S TAX APN LANDUSE ACRES DU'S TAX
CITY OF STANTON PROTECTIVE SERVICES TAX - FY 2025-26

PRELIMINARY TAX ROLL

Page 32 ends

126-283-27 R 0.05 1 $24.00
126-283-28 R 0.05 1 $24.00
126-283-29 R 0.06 1 $24.00
126-283-30 R 0.05 1 $24.00
126-283-31 R 0.05 1 $24.00
126-283-32 R 0.05 1 $24.00
126-283-33 R 0.05 1 $24.00
126-283-34 R 0.05 1 $24.00
126-283-35 R 0.05 1 $24.00
126-283-36 R 0.06 1 $24.00
126-283-43 R 0.04 1 $24.00
126-283-44 R 0.05 1 $24.00
126-283-45 R 0.05 1 $24.00
126-283-46 R 0.05 1 $24.00
126-283-47 R 0.05 1 $24.00
126-283-48 R 0.05 1 $24.00
126-283-49 R 0.05 1 $24.00
126-283-50 R 0.04 1 $24.00
126-283-51 R 0.06 1 $24.00
126-283-52 R 0.06 1 $24.00
126-283-53 R 0.04 1 $24.00
126-283-54 R 0.05 1 $24.00
126-283-55 R 0.05 1 $24.00
126-283-56 R 0.05 1 $24.00
126-283-57 R 0.05 1 $24.00
126-283-58 R 0.05 1 $24.00
126-283-59 R 0.05 1 $24.00
126-283-60 R 0.05 1 $24.00
126-284-01 R 0.06 1 $24.00
126-284-02 R 0.05 1 $24.00
126-284-03 R 0.05 1 $24.00
126-284-04 R 0.05 1 $24.00
126-284-05 R 0.05 1 $24.00
126-284-06 R 0.05 1 $24.00
126-284-07 R 0.05 1 $24.00
126-284-08 R 0.04 1 $24.00
126-284-09 R 0.06 1 $24.00
126-284-10 R 0.06 1 $24.00
126-284-11 R 0.04 1 $24.00
126-284-12 R 0.05 1 $24.00
126-284-13 R 0.05 1 $24.00
126-284-14 R 0.05 1 $24.00
126-284-15 R 0.05 1 $24.00
126-284-16 R 0.05 1 $24.00
Landuse Key: C - Commercial M - Multi-Family Residential R - Single Family Residential (incl. Condos) T - Mobile Homes V - Vacant

EXHIBIT A

Page 33 of 160 ends

APN LANDUSE ACRES DU'S TAX APN LANDUSE ACRES DU'S TAX
CITY OF STANTON PROTECTIVE SERVICES TAX - FY 2025-26

PRELIMINARY TAX ROLL

Page 33 ends

126-284-17 R 0.05 1 $24.00
126-284-18 R 0.06 1 $24.00
126-291-01 R 0 1 $24.00126-291-02 R 0 1 $24.00126-291-03 R 0 1 $24.00126-291-04 R 0 1 $24.00126-291-05 R 0 1 $24.00126-291-06 R 0 1 $24.00126-291-07 R 0 1 $24.00126-291-08 R 0 1 $24.00126-291-09 R 0 1 $24.00126-291-10 R 0 1 $24.00126-291-11 R 0 1 $24.00126-291-12 R 0 1 $24.00126-291-13 R 0 1 $24.00126-291-14 R 0 1 $24.00126-291-15 R 0 1 $24.00126-291-16 R 0 1 $24.00126-291-17 R 0 1 $24.00126-291-18 R 0 1 $24.00126-291-19 R 0 1 $24.00126-291-20 R 0 1 $24.00 126-291-21 R 0 1 $24.00
126-291-22 R 0 1 $24.00126-291-23 R 0 1 $24.00126-291-24 R 0 1 $24.00126-291-25 R 0 1 $24.00126-291-26 R 0 1 $24.00126-291-27 R 0 1 $24.00126-291-28 R 0 1 $24.00126-291-29 R 0 1 $24.00126-291-30 R 0 1 $24.00126-291-31 R 0 1 $24.00126-291-32 R 0 1 $24.00126-292-01 R 0 1 $24.00126-292-02 R 0 1 $24.00126-292-03 R 0 1 $24.00126-292-04 R 0 1 $24.00126-292-05 R 0 1 $24.00126-292-06 R 0 1 $24.00126-292-07 R 0 1 $24.00126-292-08 R 0 1 $24.00126-292-09 R 0 1 $24.00126-292-10 R 0 1 $24.00 Landuse Key: C - Commercial M - Multi-Family Residential R - Single Family Residential (incl. Condos) T - Mobile Homes V - Vacant

EXHIBIT A

Page 34 of 160 ends

APN LANDUSE ACRES DU'S TAX APN LANDUSE ACRES DU'S TAX
CITY OF STANTON PROTECTIVE SERVICES TAX - FY 2025-26

PRELIMINARY TAX ROLL

Page 34 ends

126-292-11 R 0 1 $24.00
126-292-12 R 0 1 $24.00
126-292-13 R 0 1 $24.00126-292-14 R 0 1 $24.00126-292-15 R 0 1 $24.00126-292-16 R 0 1 $24.00126-292-17 R 0 1 $24.00126-292-18 R 0 1 $24.00126-292-19 R 0 1 $24.00126-292-20 R 0 1 $24.00126-292-21 R 0 1 $24.00126-292-22 R 0 1 $24.00126-292-23 R 0 1 $24.00126-292-24 R 0 1 $24.00126-292-25 R 0 1 $24.00126-292-26 R 0 1 $24.00126-292-27 R 0 1 $24.00126-292-28 R 0 1 $24.00126-293-01 R 0 1 $24.00126-293-02 R 0 1 $24.00126-293-03 R 0 1 $24.00126-293-04 R 0 1 $24.00 126-293-05 R 0 1 $24.00126-293-06 R 0 1 $24.00126-293-07 R 0 1 $24.00126-293-08 R 0 1 $24.00126-293-09 R 0 1 $24.00126-293-10 R 0 1 $24.00126-293-11 R 0 1 $24.00126-293-12 R 0 1 $24.00126-293-13 R 0 1 $24.00126-293-14 R 0 1 $24.00126-293-15 R 0 1 $24.00126-293-16 R 0 1 $24.00126-293-17 R 0 1 $24.00126-293-18 R 0 1 $24.00126-293-19 R 0 1 $24.00126-293-20 R 0 1 $24.00126-293-21 R 0 1 $24.00126-293-22 R 0 1 $24.00126-331-01 R 0 1 $24.00126-331-02 R 0 1 $24.00126-331-03 R 0 1 $24.00126-331-04 R 0 1 $24.00 Landuse Key: C - Commercial M - Multi-Family Residential R - Single Family Residential (incl. Condos) T - Mobile Homes V - Vacant

EXHIBIT A

Page 35 of 160 ends

APN LANDUSE ACRES DU'S TAX APN LANDUSE ACRES DU'S TAX
CITY OF STANTON PROTECTIVE SERVICES TAX - FY 2025-26

PRELIMINARY TAX ROLL

Page 35 ends

126-331-05 R 0 1 $24.00
126-331-06 R 0 1 $24.00
126-331-07 R 0 1 $24.00126-331-08 R 0 1 $24.00126-331-09 R 0 1 $24.00126-331-10 R 0 1 $24.00126-331-11 R 0 1 $24.00126-331-12 R 0 1 $24.00126-331-13 R 0 1 $24.00126-331-14 R 0 1 $24.00126-332-01 R 0 1 $24.00126-333-01 R 0 1 $24.00126-333-02 R 0 1 $24.00126-333-03 R 0 1 $24.00126-333-04 R 0 1 $24.00126-333-05 R 0 1 $24.00126-333-06 R 0 1 $24.00126-333-07 R 0 1 $24.00126-333-08 R 0 1 $24.00126-333-09 R 0 1 $24.00126-333-10 R 0 1 $24.00126-333-11 R 0 1 $24.00 126-333-12 R 0 1 $24.00126-333-13 R 0 1 $24.00126-333-14 R 0 1 $24.00126-333-15 R 0 1 $24.00126-333-16 R 0 1 $24.00126-334-01 R 0 1 $24.00126-334-02 R 0 1 $24.00126-334-03 R 0 1 $24.00126-334-04 R 0 1 $24.00126-334-05 R 0 1 $24.00126-334-06 R 0 1 $24.00126-334-07 R 0 1 $24.00126-334-08 R 0 1 $24.00126-334-09 R 0 1 $24.00126-334-10 R 0 1 $24.00126-334-11 R 0 1 $24.00126-334-12 R 0 1 $24.00126-334-13 R 0 1 $24.00126-334-14 R 0 1 $24.00126-334-15 R 0 1 $24.00126-334-16 R 0 1 $24.00126-335-01 R 0 1 $24.00 Landuse Key: C - Commercial M - Multi-Family Residential R - Single Family Residential (incl. Condos) T - Mobile Homes V - Vacant

EXHIBIT A

Page 36 of 160 ends

APN LANDUSE ACRES DU'S TAX APN LANDUSE ACRES DU'S TAX
CITY OF STANTON PROTECTIVE SERVICES TAX - FY 2025-26

PRELIMINARY TAX ROLL

Page 36 ends

126-335-02 R 0 1 $24.00
126-335-03 R 0 1 $24.00
126-335-04 R 0 1 $24.00126-335-05 R 0 1 $24.00126-335-06 R 0 1 $24.00126-335-07 R 0 1 $24.00126-335-08 R 0 1 $24.00126-335-09 R 0 1 $24.00126-335-10 R 0 1 $24.00126-335-11 R 0 1 $24.00126-335-12 R 0 1 $24.00126-335-13 R 0 1 $24.00126-335-14 R 0 1 $24.00126-335-15 R 0 1 $24.00126-335-16 R 0 1 $24.00126-336-01 R 0 1 $24.00126-336-02 R 0 1 $24.00126-336-03 R 0 1 $24.00126-336-04 R 0 1 $24.00126-336-05 R 0 1 $24.00126-336-06 R 0 1 $24.00126-336-07 R 0 1 $24.00 126-341-01 R 0 1 $24.00126-342-01 R 0 1 $24.00126-342-02 R 0 1 $24.00126-342-03 R 0 1 $24.00126-342-04 R 0 1 $24.00126-342-05 R 0 1 $24.00126-342-06 R 0 1 $24.00126-342-07 R 0 1 $24.00126-342-08 R 0 1 $24.00126-342-09 R 0 1 $24.00126-342-10 R 0 1 $24.00126-342-11 R 0 1 $24.00126-342-12 R 0 1 $24.00126-342-13 R 0 1 $24.00126-342-14 R 0 1 $24.00126-343-01 R 0 1 $24.00126-343-02 R 0 1 $24.00126-343-03 R 0 1 $24.00126-343-04 R 0 1 $24.00126-343-05 R 0 1 $24.00126-343-06 R 0 1 $24.00126-344-01 R 0 1 $24.00 Landuse Key: C - Commercial M - Multi-Family Residential R - Single Family Residential (incl. Condos) T - Mobile Homes V - Vacant

EXHIBIT A

Page 37 of 160 ends

APN LANDUSE ACRES DU'S TAX APN LANDUSE ACRES DU'S TAX
CITY OF STANTON PROTECTIVE SERVICES TAX - FY 2025-26

PRELIMINARY TAX ROLL

Page 37 ends

126-344-02 R 0 1 $24.00
126-344-03 R 0 1 $24.00
126-344-04 R 0 1 $24.00126-344-05 R 0 1 $24.00126-344-06 R 0 1 $24.00126-344-07 R 0 1 $24.00126-344-08 R 0 1 $24.00126-344-09 R 0 1 $24.00126-344-10 R 0 1 $24.00126-344-11 R 0 1 $24.00126-344-12 R 0 1 $24.00126-344-13 R 0 1 $24.00126-344-14 R 0 1 $24.00126-344-15 R 0 1 $24.00126-344-16 R 0 1 $24.00126-344-17 R 0 1 $24.00126-344-18 R 0 1 $24.00126-344-19 R 0 1 $24.00126-344-20 R 0 1 $24.00126-344-21 R 0 1 $24.00126-344-22 R 0 1 $24.00126-344-23 R 0 1 $24.00 126-344-24 R 0 1 $24.00126-344-25 R 0 1 $24.00126-344-26 R 0 1 $24.00126-344-27 R 0 1 $24.00126-344-28 R 0 1 $24.00126-344-29 R 0 1 $24.00126-344-30 R 0 1 $24.00126-344-31 R 0 1 $24.00126-344-32 R 0 1 $24.00126-344-33 R 0 1 $24.00126-344-34 R 0 1 $24.00126-345-01 R 0 1 $24.00126-345-02 R 0 1 $24.00126-345-03 R 0 1 $24.00126-345-04 R 0 1 $24.00126-345-05 R 0 1 $24.00126-345-06 R 0 1 $24.00126-345-07 R 0 1 $24.00126-345-08 R 0 1 $24.00126-345-09 R 0 1 $24.00126-345-10 R 0 1 $24.00126-345-11 R 0 1 $24.00 Landuse Key: C - Commercial M - Multi-Family Residential R - Single Family Residential (incl. Condos) T - Mobile Homes V - Vacant

EXHIBIT A

Page 38 of 160 ends

APN LANDUSE ACRES DU'S TAX APN LANDUSE ACRES DU'S TAX
CITY OF STANTON PROTECTIVE SERVICES TAX - FY 2025-26

PRELIMINARY TAX ROLL

Page 38 ends

126-345-12 R 0 1 $24.00
126-345-13 R 0 1 $24.00
126-345-14 R 0 1 $24.00126-345-15 R 0 1 $24.00126-345-16 R 0 1 $24.00126-345-17 R 0 1 $24.00126-345-18 R 0 1 $24.00126-345-19 R 0 1 $24.00126-345-20 R 0 1 $24.00126-345-21 R 0 1 $24.00126-351-41 V 0.07 1 $5.25 126-355-03 C 0.2 1 $60.00
126-363-10 C 0.52 0 $156.00
126-363-11 C 0.27 0 $81.00
126-363-13 C 0.28 0 $84.00
126-363-14 C 0.28 0 $84.00
126-363-15 C 0.28 1 $84.00
126-363-16 C 0.34 0 $102.00
126-363-17 C 0.17 0 $51.00
126-371-01 M 1.17 23 $552.00126-371-02 M 1.17 23 $552.00126-371-03 C 0.6 0 $180.00 126-371-04 C 0.43 0 $129.00
126-371-05 C 1.1 0 $330.00
126-371-06 M 0.16 3 $72.00126-371-07 R 0 1 $24.00
126-371-08 R 0 1 $24.00126-371-09 R 0 1 $24.00126-371-10 R 0 1 $24.00126-371-11 R 0 1 $24.00126-371-12 R 0 1 $24.00126-371-13 R 0 1 $24.00126-371-14 R 0 1 $24.00126-371-15 R 0 1 $24.00126-372-01 R 0 1 $24.00126-372-02 R 0 1 $24.00126-372-03 R 0 1 $24.00126-372-04 R 0 1 $24.00126-372-05 R 0 1 $24.00126-372-06 R 0 1 $24.00126-372-07 R 0 1 $24.00126-372-08 R 0 1 $24.00126-372-09 R 0 1 $24.00126-372-10 R 0 1 $24.00 Landuse Key: C - Commercial M - Multi-Family Residential R - Single Family Residential (incl. Condos) T - Mobile Homes V - Vacant

EXHIBIT A

Page 39 of 160 ends

APN LANDUSE ACRES DU'S TAX APN LANDUSE ACRES DU'S TAX
CITY OF STANTON PROTECTIVE SERVICES TAX - FY 2025-26

PRELIMINARY TAX ROLL

Page 39 ends

126-372-11 R 0 1 $24.00
126-372-12 R 0 1 $24.00
126-372-13 R 0 1 $24.00126-372-14 R 0 1 $24.00126-372-15 R 0 1 $24.00126-372-16 R 0 1 $24.00126-372-17 R 0 1 $24.00126-372-18 R 0 1 $24.00126-372-19 R 0 1 $24.00126-372-20 R 0 1 $24.00126-372-21 R 0 1 $24.00126-372-22 R 0 1 $24.00126-372-23 R 0 1 $24.00126-372-24 R 0 1 $24.00126-372-25 R 0 1 $24.00126-372-26 R 0 1 $24.00126-372-27 M 0.16 4 $96.00 126-372-28 M 0.16 6 $144.00
126-372-29 M 0.16 6 $144.00
126-372-30 M 0.16 6 $144.00
126-372-31 M 0.16 6 $144.00
126-372-32 M 0.16 6 $144.00
126-372-33 M 0.16 6 $144.00
126-372-34 M 0.16 6 $144.00
126-372-35 M 0.16 12 $288.00
126-381-01 R 0 1 $24.00
126-381-02 R 0 1 $24.00126-381-03 R 0 1 $24.00126-381-04 R 0 1 $24.00126-381-05 R 0 1 $24.00126-381-06 R 0 1 $24.00126-381-07 R 0 1 $24.00126-381-08 R 0 1 $24.00126-381-09 R 0 1 $24.00126-381-10 R 0 1 $24.00126-381-11 R 0 1 $24.00126-381-12 R 0 1 $24.00126-381-13 R 0 1 $24.00126-381-14 R 0 1 $24.00126-381-15 R 0 1 $24.00126-381-16 R 0 1 $24.00126-382-01 R 0 1 $24.00126-382-02 R 0 1 $24.00126-382-03 R 0 1 $24.00 Landuse Key: C - Commercial M - Multi-Family Residential R - Single Family Residential (incl. Condos) T - Mobile Homes V - Vacant

EXHIBIT A

Page 40 of 160 ends

APN LANDUSE ACRES DU'S TAX APN LANDUSE ACRES DU'S TAX
CITY OF STANTON PROTECTIVE SERVICES TAX - FY 2025-26

PRELIMINARY TAX ROLL

Page 40 ends

126-382-04 R 0 1 $24.00
126-382-05 R 0 1 $24.00
126-382-06 R 0 1 $24.00126-382-07 R 0 1 $24.00126-382-08 R 0 1 $24.00126-382-09 R 0 1 $24.00126-382-10 R 0 1 $24.00126-382-11 R 0 1 $24.00126-382-12 R 0 1 $24.00126-383-01 R 0 1 $24.00126-383-02 R 0 1 $24.00126-383-03 R 0 1 $24.00126-383-04 R 0 1 $24.00126-383-05 R 0 1 $24.00126-383-06 R 0 1 $24.00126-383-07 R 0 1 $24.00126-383-08 R 0 1 $24.00126-383-09 R 0 1 $24.00126-383-10 R 0 1 $24.00126-383-11 R 0 1 $24.00126-383-12 R 0 1 $24.00126-384-01 R 0 1 $24.00 126-384-02 R 0 1 $24.00126-384-03 R 0 1 $24.00126-384-04 R 0 1 $24.00126-384-05 R 0 1 $24.00126-384-06 R 0 1 $24.00126-384-07 R 0 1 $24.00126-384-08 R 0 1 $24.00126-384-09 R 0 1 $24.00126-384-10 R 0 1 $24.00126-384-11 R 0 1 $24.00126-384-12 R 0 1 $24.00126-384-13 R 0 1 $24.00126-384-14 R 0 1 $24.00126-384-15 R 0 1 $24.00126-384-16 R 0 1 $24.00126-384-17 R 0 1 $24.00126-384-18 R 0 1 $24.00126-384-19 R 0 1 $24.00126-384-20 R 0 1 $24.00126-384-21 R 0 1 $24.00126-384-22 R 0 1 $24.00126-385-01 R 0 1 $24.00 Landuse Key: C - Commercial M - Multi-Family Residential R - Single Family Residential (incl. Condos) T - Mobile Homes V - Vacant

EXHIBIT A

Page 41 of 160 ends

APN LANDUSE ACRES DU'S TAX APN LANDUSE ACRES DU'S TAX
CITY OF STANTON PROTECTIVE SERVICES TAX - FY 2025-26

PRELIMINARY TAX ROLL

Page 41 ends
← All documents from this meeting