CITY OF UKIAH

THICKENING AND DEWATERING

IMPROVEMENTS
89 3/7/23
00-S-003

STRUCTURAL GENERAL NOTES III,

LEGEND AND ABBREVIATIONS
27 STRUCTURAL AND MISCELLANEOUS STEEL

1. STRUCTURAL SHAPES, PLATES AND BARS SHALL CONFORM TO ASTM A36, UNLESS OTHERWISE NOTED. 2. STRUCTURAL STEEL TUBES SHALL CONFORM TO ASTM A500, GRADE B. 3. STRUCTURAL STEEL PIPE SHALL CONFORM TO ASTM A53, TYPE S, GRADE B. 4. MACHINE BOLTS (MB) SHALL CONFORM TO ASTM A307. 5. NUTS SHALL BE HEAVY HEX IN ACCORDANCE WITH ANSI B8.2.1.1. 6. ALL STRUCTURAL STEEL SHALL BE FABRICATED, ERECTED AND CONNECTED IN COMPLIANCE WITH THE LATEST AISC MANUAL. 7. CONNECTIONS FOR STRUCTURAL STEEL SHALL CONFORM TO ASTM A325, SC, CLASS A. UNLESS OTHERWISE NOTED, ALL BOLTS SHALL BE 3/4 INCH DIAMETER MEETING THE REQUIREMENTS OF ASTM A325. BOLTS SHALL BE TIGHTENED USING THE TURN-OF-THE-NUT METHOD. THREADED RODS AND ANCHOR BOLTS SHALL BE FURNISHED WITH FLAT WASHERS AND HEAVY HEX NUTS, UNLESS OTHERWISE NOTED ON DRAWINGS. 8. ALL WELDING SHALL BE DONE IN ACCORDANCE WITH THE LATEST EDITION OF THE STRUCTURAL WELDING CODE, AWS (D1.1). ALL WELDING SHALL BE PERFORMED BY CERTIFIED WELDERS. 9. WELDING ELECTRODES SHALL MEET THE MINIMUM REQUIREMENTS OF E70XX. FILLER METAL FOR WELDS IN MOMENT CONNECTIONS SHALL HAVE A MINIMUM CVN VALUE OF 20 FT-LB AT 0 DEGREE F. 10. ALL METAL FABRICATIONS SHALL RECEIVE A SHOP COAT OF RUST INHIBITIVE PAINT MEETING FEDERAL SPECIFICATION TT-P-86, TYPE III. 11. WHERE BUTT WELDS ARE SHOWN, MATERIAL SHALL BE GROUND TO A BEVEL AND WELD SHALL BE FULL PENETRATION. 12. ALL BOLT HOLES SHALL BE PUNCHED OR DRILLED (REAMED). BURNING OF HOLES IS NOT ACCEPTABLE. 13. SHOP DRAWINGS SHALL BE SUBMITTED FOR REVIEW BY THE ENGINEER PRIOR TO FABRICATION. 14. SHOP PAINTING AND FIELD PAINTING, IF REQUIRED, SHALL BE DONE IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS. STRUCTURAL STEEL SHALL BE SHOP PRIMED UNLESS OTHERWISE NOTED.

FRP MOLDED GRATING

1. GRATING AND SUPPORTS SHALL BE YELLOW IN COLOR, MANUFACTURED WITH POLYESTER FIRE RETARDANT RESIN WITH A FLAME SPREAD RATING OF 25 OR LESS WHEN TESTED IN ACCORDANCE WITH THE ASTM E-84 TUNNEL TEST. THICKNESS SHALL BE AS INDICATED ON THE DRAWINGS. 2. GRATING SHALL BE MOLDED, ONE-PIECE CONSTRUCTION WITH A 1 1/2” SQUARE MESH PATTERN AND A MENISCUS SURFACE. 3. GLASS CONTENT SHALL BE A MINIMUM OF 25 PERCENT AND A MAXIMUM OF 35 PERCENT BY WEIGHT AS DETERMINED BY ASTM D2584. GRATING PANELS SHALL HAVE NO EXPOSED DRY GLASS OR VOIDS CONTAINING DRY GLASS. 4. FRP GRATING SHALL BE CAPABLE OF SUPPORTING A UNIFORM LIVE LOAD OF 100 PSF WHILE MAINTAINING A DEFLECTION OF LESS THAN 1/4-INCH OR L/200 WHICHEVER IS SMALLER. GRATING SHALL BE CAPABLE OF SUPPORTING A CONCENTRATED LIVE LOAD OF 300 LB/FT TRANSVERSE TO THE SPAN. A FACTOR OF SAFETY OF 5.0 SHALL BE APPLIED TO ULTIMATE CAPACITIES TO DETERMINE ALLOWABLE SPANS. 5. CONTRACTOR SHALL BE REQUIRED TO FURNISH CERTIFIED LOAD/DEFLECTION

STATISTICAL QUALITY CONTROL DATA AND LOAD/DEFLECTION INFORMATION FOR THE SUPPLIED GRATING. 6. ALL GRATING WHICH REQUIRES CUTTING DURING INSTALLATION SHALL HAVE THE AFFECTED SURFACES SEALED WITH CATALYZED RESIN SEALANT OF EQUAL OR SUPERIOR CORROSION RESISTANCE TO THE GRATING. 7. FASTENERS, ANCHORS, BOLTS, NUTS AND WASHERS FOR GRATING AND SUPPORTS SHALL BE TYPE 304 OR 316 STAINLESS STEEL. ALL FRP GRATING SHALL BE SECURELY FASTENED TO SUPPORTS WITH STAINLESS STEEL GRATING CLIPS AND STAINLESS STEEL ANCHORS, UNLESS OTHERWISE NOTED. 8. GRATING PANEL LAYOUT SHALL PROVIDE FOR THE REMOVAL OF GRATING AROUND PIPE AND OTHER GRATING PENETRATIONS. MULTIPLE GRATING

SECTIONS SHALL BE PROVIDED SUCH THAT NO ONE SECTION IS GREATER THAN 75 POUNDS IN WEIGHT.

LEGEND:

FIBERGRATE MOLDED GRATING
ABBREVIATION NOTES: 1. ABBREVIATIONS AND DESIGNATIONS FOR STEEL MEMBERS MAY BE FOUND IN THE CURRENT STEEL CONSTRUCTION MANUAL BY AISC. 2. ABBREVIATIONS OF TECHNICAL SOCIETIES AND TRADE ASSOCIATIONS MAY BE FOUND IN THE

SPECIFICATIONS

3. WELDING SYMBOLS AND ABBREVIATIONS MAY BE FOUND IN AWS 2.4. 4. ABBREVIATIONS LISTED ARE FOR USE WITH STRUCTURAL DRAWINGS ONLY. SOME ABBREVIATIONS LISTED MAY NOT BE USED ON THE PLANS.

SCHED SCHEDULE

CTJ CONTROL JOINT

EA EACH

LW LIGHTWEIGHT
EPOXY

EXTERIOR

EXISTING
EY

EXT EXST EXPANSION JOINT EXPANSION

EACH WAY

ETCETERA

EACH SIDE

EQUIVALENT EQUIPMENT EQUAL (LY)

ELEVATION

EACH FACE

ECCENTRIC

EXPANSION BOLT EQUIPMENT DRAIN

EMBEDMENT
EXP JT
EQUIV
ETC
EXP
EW
ES
EQUIP
EMBED
EF
EQ
EL
ECC
EB
ED

OPTION (AL) OPPOSITE HAND OPPOSITE OPENING(S) OUTSIDE FACE ON CENTER OR EQUAL NOT TO SCALE OUTSIDE DIAMETER OPP OPT OPP HD OCOPNG(S) O.F. ODO/E NTS NON-SHRINK GROUT NOT IN CONTRACT

MASONRY OPENING MANUFACTURER MASONRY CONTROL JOINT MAXIMUM

MATERIAL MASONRY MACHINE BOLT
NSG
NOM
NIC

MTL MOMIN

NOMINAL

METAL MINIMUM
MAX MFR MCJ MB MATL MAS d PENNY

DOWEL(S)

DRAWING(S) DAMPROOFING

DEAD LOAD

DIMENSION

DIAGONAL DIAMETER

DETAIL DEMOLITION

DN DOWN
DWL(S)

DWG(S) DR
DPDO. DRAIN
DITTO
DEMO
DL DIM
DIAG

DIA DET

CENTER (ED)

COURSE(S) CONTINUOUS CONNECTION

CONCRETE COLUMN

CONCRETE MASONRY UNIT CLEAR

CAULKING

CONSTRUCTION

DEEP, DEPTH

COUNTERSINK
CONST
CTR D

CRS CONT CSK
CMU
CONN
CONC

COL CLR
CLKG
I.F. INSIDE FACE

LONGITUDINAL

LONG LEG VERTICAL

LONG LEG HORIZONTAL

JOINT FILLER

LOW POINT

LG LONG
LONG. LP
LT
LNTL
LLV
LLH
LEFT
LINTEL
JT FLR
JT
IE
INT
JOINT

INVERT ELEVATION

INTERIOR

HIGH STRENGTH

INSIDE DIAMETER

HIGH POINT HORIZONTAL HOLLOW METAL

HARDWOOD

HEADED ANCHOR STUD

HANDRAIL HM
HS
ID
HOR
HPHR
HDWD

HGT HGR
HDR
H.A.S.

HEIGHT HANGER
HEADER

TPER THERMOPLASTIC

WELDED WIRE FABRIC WATERPROOFING WATERSTOP WWF WT WPG WS WEIGHT

ELASTOMERIC RUBBER

WORKING POINT WIDTH / WOOD WITHOUT

VERTICAL VAPOR RETARDER

UNLESS OTHERWISE NOTED

TYPICAL TRANSVERSE

W/ WP WD W/O
VERT W

WITH WIDE
VR
UON
TYP
TRNSV

STWY STAIRWAY

TOOLED JOINT

TOP OF WALL TOP OF STEEL TOP OF CONCRETE

THICK (NESS) THREADED

TRENCH DRAIN

TONGUE AND GROOVE

TOP AND BOTTOM

TREAD (S) SYMMETRICAL
THD
TOC
T.O.W. TOS
TJTHK
T.O. TOP OF
TD
T&G
T&B
SYM T

STRUCTURE (S, URAL)

STIRRUP (S) STANDARD

STAINLESS STEEL SQUARE

SPECIFICATION, SPECIFIED

SPACE (S, ED) SEALANT SIMILAR

SECTION

STIFFENER
SQ
STRUC
STL STIR. STD
SS

STIF STEEL
SIM
SPEC
SP

SLNT SHT SECT SHEET

CEILING

CENTERLINE CHECKERED

CENTER TO CENTER

BETWEEN
BOTTOM

BLOCK(ING) BUILDING

BACK TO BACK

BEARING

CIRCUMFERENTIAL CONSTRUCTION JOINT

BOTTOM OF
C/C
CIRC
CLG

CL CJ CHKD
BTWN
B TO B
B.O. BOT BRG
BLK
BLDG

ANCHOR ROD

ALUMINUM

ADDITIONAL

ANCHOR BOLT DIAMETER

ALTERNATE(ING)

APPROXIMATE(LY) AR
ADDL
APPROX
ALT AL
ABØ

GALVANIZED STEEL GALVANIZED

FURNISHED

FIBERGLASS REINFORCED

FLEXIBLE

FINISH (ED)

GUARD RAIL GALV GRTG

GALVS GR

FURN GA

GRATING
GAGE
FLEX
FTG
FRP
FIN
FIG
FL

FOOTING

PLASTIC
FLOOR
FIGURE

FLATHEAD WOOD SCREW

FLATHEAD MACHINE

FOUNDATION

FLOOR DRAIN

FABRICATE (OR, ED) MASONRY PRISM STRENGTH

STRENGTH

CONCRETE COMPRESSIVE
FDN
FHWS
FHMS
FAB
f'm
FD
SCREW
f'c

ROUGH OPENING

REVISION

REQUIRED

REINFORCE (D, ING) ROOF DRAIN

PAVEMENT

REINFORCED CONCRETE REFERENCE / REFER
RM
RO

RTREV REQD

REINF ROOM
RIGHT
RAD
RD
RC
REF
PVMT R

RADIUS RISER

PRESSURE TREATED

PRE-FABRICATED

PRECAST PRESSED METAL PLYWOOD

PREMOLDED JOINT FILLER

POLYVINYL CHLORIDE

PL PLATE
PREFAB

PTPTPVC

PRCST PM
PLYWD
POINT
PJF
(E) EXISTING

EN EDGE NAILING

SB SOLID BLOCKING

HD HAND

SL SLOPE
I.P.S. IRON PIPE SIZE

ACI AMERICAN CONCRETE

INSTITUTE

AISC AMERICAN INSTITUTE OF STEEL CONSTRUCTION

ARND AROUND

ASTM ASTM INTERNATIONAL AWS AMERICAN WELDING

SOCIETY

BAR DIAMETER

CRSI CONCRETE REINFORCING
STEEL INSTITUTE db

SSMH SANITARY SEWER MANHOLE

AITC AMERICAN INSTITUTE OF

TIMBER CONSTRUCTION

GLB GLUE LAMINATED BEAM

DF DOUGLAS FIR

WF WIDE FLANGE

AISI AMERICAN IRON AND

STEEL INSTITUTE

ASCE AMERICAN SOCIETY OF CIVIL ENGINEERS

CBC CALIFORNIA BUILDING
CODE

ICC INTERNATIONAL CODE COUNCIL

ESR EVALUATION SERVICE REPORT

BM BEAM

VIF VERIFY IN FIELD

PWT PREFABRICATED WOOD TRUSS

ATR ALL-THREADED ROD

FO FACE OF
Ld DEVELOPMENT LENGTH
Ldh DEVELOPMENT LENGTH

STANDARD HOOK

JB JUNCTION BAR
Ls CLASS B TENSION CONTACT LAP SPLICE

IAMPO INTERNATIONAL ASSOCIATION OF PLUMBING

AND MECHANICAL OFFICALS

LL LIVE LOAD

NAAMM NATIONAL ASSOCIATION OF ARCHITECTURAL METAL MANUFACTURERS

PCF POUNDS PER CUBIC FOOT

PSF POUNDS PER SQUARE FOOT PSI POUNDS PER SQUARE INCH

DBL DOUBLE

BN BOUNDARY NAILING

EOR ENGINEER OF RECORD

UES UNIFORM EVALUATION SERVICES
ABBREVIATIONS:

CONCRETE

STRUCTURAL FILL/BACKFILL UNDISTURBED
EARTH

CLASS II AGGREGATE
BASE

CONCRETE GROUT

IN INCHES

ASPHALT

Page 333 of 1198 ends

CITY OF UKIAH

THICKENING AND DEWATERING

IMPROVEMENTS
89 3/7/23

U-BAR OF THE SAME
SIZE AS THE LARGEST HOR BAR MAY BE USED IN PLACE OF BAR HOOKS AT THE CONTRACTORS OPTION. WALL TO WALL (PLAN) NON-WATER BEARING (PLAN) SLAB OR WALL CONTINUATION WALL TO BOTTOM SLAB (SECTION) (PLAN/SECTION)

SLAB REINF SLAB REINF
ls 2" 2" ls (UON)
CJ
WALL
SLAB 2" 2"

WALL CJ
2" 1"
2" 2"

STAGGER SPLICE T&B
(EF AT WALLS)
CJ

CONSTRUCTION JOINT (CJ)
DETAIL 03002

NTS VAR
WALL
JB
JB
ls ls WALL REINF 2" (TYP)
2"
(TYP)
JB

SLAB OR WALL REINF
CONSTRUCTION JOINT NOTES: 1. REINFORCING SHOWN IS FOR CLARITY ONLY. SEE PLANS AND SECTIONS FOR

REINFORCING SIZES, SPACING, LOCATION
AND DETAILS. 2. ALL SURFACES SHALL BE PREPARED IN
ACCORDANCE WITH PROJECT SPECIFICATIONS. 3. JUNCTION BARS SHALL BE SAME SIZE OF THE LARGER OF WALL OR SLAB REINFORCING EXCEPT WHERE OTHERWISE NOTED ON THE DETAILS OR DRAWINGS. THESE ARE ADDITIONAL BARS TO THOSE CALLED OUT FOR WALLS & SLABS. JUNCTION BARS SHALL BE PLACED INSIDE PRIMARY REINFORCING.

4. ALL LAP SPLICES SHALL BE CLASS B
TENSION CONTACT LAP. 5. SEE PLANS & SECTIONS FOR LOCATION OF JOINTS. 6. UNLESS OTHERWISE NOTED, WITHIN

CONTRACT DOCUMENTS, REINFORCING

BARS SHALL TERMINATE WITH A STANDARD
HOOK. WHERE SECTION THICKNESS DOES NOT ALLOW FOR FULL HOOK EXTENSION, ROTATE HOOK UNTIL HOOK FITS. ALTERNATIVELY, CONTRACTOR MAY USE 180° HOOK OR TWO SMALLER HOOKED BARS OF EQUIVALENT AREA OF STEEL. 7. SEE PLANS AND SECTIONS FOR ORIENTATION OF PRIMARY REINFORCING.

CJ 2"

WALL REINF WALL REINF WALL REINF WALL REINF

WALL REINF

SLAB OR WALL REINF
00-S-004
STRUCTURAL STANDARD DETAILS I 28

UON ON DRAWINGS

CONCRETE CHAMFER
DETAIL 03028

VAR NTS
3/4" 3/4"

MATCH TYP
SLAB REINF AT BOT (2-#5 MIN) LAP 2'-0" AT CORNERS

TYP SLAB REINF SEE

PLANS AND SECTIONS
12" 12"
1 1
SEE
PLAN
#5 CONT
LAP 2'-0" AT CORNERS 1'-6" (MIN) 4" (UON) (MIN) #4@12 x

THICKENED SLAB EDGE
DETAIL 03032
VAR

NTS SEE PLANS

LAP SPLICE LENGTH
DETAIL 03026

VAR NTS
NOTES: 1. Id: DEVELOPMENT LENGTH FOR A STRAIGHT REINFORCING BAR IN TENSION.

Is: CLASS B TENSION CONTACT LAP SPLICE LENGTH.

Idh: DEVELOPMENT LENGTH FOR STANDARD
HOOKS IN TENSION. 2. LAP SPLICES SHALL BE CLASS B TENSION CONTACT

LAP SPLICES TYPICAL, UNLESS OTHERWISE NOTED ON
DRAWINGS. 3. TOP BAR IS ANY HORIZONTAL BAR WITH MORE THAN 12" CONCRETE CAST IN ONE LIFT BENEATH THE BAR,
INCLUDING BUT NOT LIMITED TO, HORIZONTAL BARS CAST IN WALLS.. 4. SPLICES IN HORIZONTAL BARS SHALL BE STAGGERED. 5. UNLESS OTHERWISE DETAILED ON THE DRAWINGS, SPLICES IN TWO CURTAINS SHALL NOT OCCUR IN THE SAME LOCATION.
#3 TOP BAR OTHER TOP BAR OTHER
Id (INCHES) Is (INCHES)
#4
#5
#6
24 32
39 47 37
30 25
19 32
42 51
62 49
39 33
25 18
15 12
9 Idh
(INCHES)
#3
#4
#5
#6
#7
#8
#9
#10
BAR SIZE 2500 4000ƒ'c (PSI) CONCRETE
#7
#8
#9
#10
69 78
88 100 77
68 60
54 90
102
115
130 101
89 78
71 31
28 24
21 #5@10 T&B EW

FINISH GRADE SLOPE

AWAY FROM PAD
#4@12
(TYP)
2 - #5 CONT LAP
2'-0" AT CORNERS
(TYP)
12" UNLESS OTHERWISE NOTED ON DRAWINGS
CLASS 2 AGGREGATE ROAD BASE
(3/4" TO FINE) COMPACTED TO 95%

OF MAXIMUM DENSITY AND MOISTURE CONTENT OF NOT LESS

THAN TWO PERCENTAGE POINTS
ABOVE OPTIMUM PER ASTM D1557
DIMENSIONS AS REQD TO SUIT EQUIPMENT OR AS NOTED ON PLAN 4" (MIN) 1'-6" (MIN) 12"
12"
12"
1 1
1 1

EXTERIOR EQUIPMENT SLAB
DETAIL 03075

VAR NTS
12" 12" (MIN)
(TYP)
12" MIN
12" 12" 12" MIN 12" (MIN)
19 25
31 37
54 62
70 79 61
54 48
42 29
24 20
15 25
33 41
49 71
81 91
103 80
71 63
55 38
32 26
20 25
22 19
17 15
12 10
8 6" EMBED
(TYP)

DIMENSIONS AS REQD TO SUIT EQUIPMENT OR AS NOTED ON PLAN

ALIGN TOP OF CONCRETE

CONC PAD REFER TO
(UON)
#5 ADHESIVE DWLS
AT 12" x 2'-6" LG, (TYP)
#4@12 , TYP AT PERIMETER
2'-0" 2'-0"
CLASS 2 AGGREGATE ROAD BASE
(3/4" TO FINE) COMPACTED TO 95%

OF MAXIMUM DENSITY AND MOISTURE CONTENT OF NOT LESS

THAN TWO PERCENTAGE POINTS
ABOVE OPTIMUM PER ASTM D1557

EXTERIOR EQUIPMENT SLAB
DETAIL 03074

NTS VAR
#5@10 EW
T&B 4" (MIN) 4" (MIN)
03075
-
NOTE: 1. SEE MECHANICAL DRAWINGS FOR BALANCE OF INFORMATION. 1'-0" 3/4" EJ, (TYP)

ALIGN TOP OF CONCRETE
3/4" EJ, (TYP)

Page 334 of 1198 ends

00-S-005
STRUCTURAL STANDARD DETAILS II 29

EXST HOLE
8" (MAX)

EXST CONC
ADEKA P201
(OR APPROVED EQUAL) ALL AROUND
1" SAWCUT EF

FINISH TO MATCH EXST CONC SURFACE

CHIP OUT CONC, EXPOSE
& CLEAN EXST REINF &

INCORPORATE INTO NEW

WORK PREPARE SURFACE

BY METHOD A
NOTES: 1. SEE PROJECT SPECIFICATION FOR CONCRETE SURFACE PREPARATION (METHOD A) AND ADDITIONAL INFORMATION. 2. SEE MECHANICAL DRAWINGS FOR BALANCE OF INFORMATION.

T/2
1"
T
6" TO 8"Ø PIPE REMOVAL WALL PENETRATION
DETAIL 03159

NTS VAR

REMOVE CONC TO LIMITS

SHOWN, AS SPECIFIED

PREPARE DEMOLISHED

SURFACE BY METHOD B, PACK W/ NON-SHRINK GROUT NEW CASTING, (IF REQUIRED)

CUT EXST REINF,

IF PRESENT, AND

BEND ARND NEW

OPNG AS SHOWN
3/4" CLR MIN

BTWN REBAR
& CASTING

OR EDGE OF OPNG IF NO

CASTING
NOTES: 1. SEE PROJECT SPECIFICATION FOR CONCRETE SURFACE PREPARATION (METHOD B) AND ADDITIONAL INFORMATION. 2. SEE MECHANICAL DRAWINGS FOR BALANCE OF INFORMATION.

NEW
OPNG
(E) WALL/SLAB (E) WALL/SLAB D<16"Ø 4" (MIN) 8" (MAX)

NEW PENETRATION

THROUGH EXISTING CONCRETE
DETAIL 03156

NTS VAR

ELEVATION SECTION
SIKA TOP-123

BOND NON-SHRINK GROUT TO SATURATED

SURFACE DRY MATCH

EXST CONCRETE AS

SPECIFIED, (UON)

CUT EXST DOWELS
1" FROM FACE

EXST CONC
1" MAX

SAWCUT ALL AROUND

EXST EQUIP PAD

TO BE REMOVED
NOTE: 1. SEE PROJECT SPECIFICATION AND MECHANICAL DRAWINGS FOR ADDITIONAL INFORMATION.

REMOVE EXST CONC DOWN TO
2" MAX BELOW

TOP OF EXST SLAB, (UON)

EXISTING EQUIPMENT PAD REMOVAL AND SLAB REPAIR
DETAIL 03153

NTS VAR

EXCAVATE (E) CONC

AREA AS-NEEDED FOR

PROPER REPAIR

EXCAVATE
APPROXIMATELY 90° RE-ENTRANT CORNERS
(TYP) ROUGHEN VERTICAL AND HORIZONTAL SURFACES TO 1/4" AMPLITUDE (TYP), (UON)

CITY OF UKIAH

THICKENING AND DEWATERING

IMPROVEMENTS
89 3/7/23
FRP L3x3x3/8 CONT

FRP GRATING
t
1"
(MAX) 1 1/4"

FRP GRATING SUPPORT
DETAIL 06001

NTS VAR
HILTI HIT-RE 500-V3+
1/2"Ø HAS 316 ALL-THREAD
ROD W/ 4 1/4" MIN EMBED
AT 18" OC MAX
(MIN OF 2 PLACE'S)
(OR APPROVED EQUAL) GRATING SUPPORT NOTE: 1. GRATING AND GRATING SUPPORTS SHALL BE PROVIDED BY THE SAME MANUFACTURER.

MATCH T.O. EL

FLUID SIDE OF WALL

Page 335 of 1198 ends

CITY OF UKIAH

THICKENING AND DEWATERING

IMPROVEMENTS
89 3/7/23
70-S-001
MISCELLANEOUS DETAILS 30

EXCAVATE (E) CONC AREA AS-NEEDED
FOR PROPER REPAIR AREA REMOVE EXIST CONC DOWN TO 2" MAX BELOW TOP OF EXIST, (UON) (E) CONC SLAB
SIKA QUICK 1000
(UON)

ROUGHEN VERTICAL & HORIZONTAL SURFACES
TO 1/4" AMPLITUDE
(TYP), (UON)
70-D-001 & 70-D-006 A
SCALE: 3"=1'-0" DETAIL

CONCRETE SLAB REPAIR
5'-8" (MAX)

SUPPORTED

FLOCCULATION
PIPE
10" MAX DIA
ANVIL 265 ADJUSTABLE PIPE

SADDLE SUPPORT W/ U-BOLT
(OR APPROVED EQUAL)
4"Ø ANVIL STANCHION
TYPE 63
(OR APPROVED EQUAL)
3/8x8x8 PL PER ANVIL STD
(4) 1/2"Ø HILTI KWIK HUS EZ
W/ 3" EMBED, (TYP) 1" NSG
70-M-001 B
SCALE: 1"=1'-0" DETAIL

HORIZONTAL PIPE SUPPORT
8" 8"
1 1/2"
(TYP) 1 1/2" (TYP)

MAX TRIBUTARY WEIGHT
FROM PIPE = 600LB OR MAX TRIBUTARY PIPE
SPAN 5'-0"
-D
SCALE: 1 1/2"=1'-0" DETAIL

DEFLECTOR PLATE
2'-6"
1 1/2" EQ EQ 1 1/2"
1'-0"
L3x2x1/4" LLV
L3x2x1/4" LLV 6" 1'-0"
19"±
PL 1/4"x3 1/2"x3 1/2" 4'-0"
3/16
(2) L2x2x1/4"
3 1/2" 3 1/2" 1 1/2" 1/2"
1 1/2" 1 1/2" 1 1/2"
PL 1/4"x3 1/2"x3 1/2"
(5) 1/2"Ø SS HILTI ADHESIVE HIT-HY 200 V3 + HIT-Z-R W/ 4" EMBED, (TYP) 3/16
L2x2x1/4" SHEET NOTES: 1. SEE MECHANICAL DRAWINGS FOR BALANCE OF INFORMATION. 2. DEFLECTOR PLATE, SHIPPING CONTAINER AND

FLOCCULATION TUBE STAND ARE DEFERRED
SUBMITTAL ITEMS AND ARE THE RESPONSIBILITY OF THE CONTRACTOR. DEFLECTOR PLATE, SHIPPING CONTAINER AND FLOCCULATION TUBE

STAND HAVE NOT BEEN DESIGNED BY THE
ENGINEER OF RECORD. REFER TO STRUCTURAL NOTES AND PROJECT SPECIFICATIONS FOR ADDITIONAL INFORMATION.

NOTE: 1. REFER TO DETAIL FOR BALANCE OF INFORMATION. 03153 00-S-005
(E) CONC

STANCHION
70-M-001 C
SCALE: NTS DETAIL

FLOCCULATION TUBE STAND
(CL 51") MOUNTING HOLES
(CL 37") MOUNTING HOLES
10"Ø FLOCCULATION
PIPES
3" SQ FLOCCULATION

TUBE STAND
(4) 1/2"Ø SS HILTI ADHESIVE HIT-RE 500 V3 + HAS-R W/ 6 1/4" EMBED, (TYP) 1/2" SCALE: 1/4"=1'-0" SHIPPING CONTAINER FOUNDATION PLAN
10'-0"* 26'-0"* 1'-4"* (TYP)
TOS EL 575.83
PACIFIC MARINE & INDUSTRIAL BOLT DOWN TWISTLOCK W/ (4) 1/2"Ø SS HILTI KWIK

HUS EZ (KH-EZ)
W/ 2 1/2" EMBED, (TYP)
(OR APPROVED EQUAL)
CONC SLAB ON GRADE W/ #5@10 OC EW T&B

SEE FOR ADD'L INFO
(PLAN VIEW - TWISTLOCK)
03074
00-S-004

OUTLINE SHIPPING

CONTAINER
(NOTE 1)
1'-4"*
(TYP)
NOTE: 1. FINAL DIMENSION TO BE COORDINATED WITH
SHIPPING CONTAINER MANUFACTURER.
70-M-004
CL (2) AB'S CL (2) AB'S
CL (2) AB'S CL (2) AB'S
OPP HD

Page 336 of 1198 ends

CITY OF UKIAH

THICKENING AND DEWATERING

IMPROVEMENTS
89 3/7/23
75-S-001
PLANS AND SECTIONS 31
16'-0" 2'-0" 1'-0"
13'-0" 26'-0" 22'-0" 2'-0" 2'-0" 20'-0" 1'-0" 1'-0"
TOS EL 575.83
SCALE: 1/4"=1'-0" DEWATERED SOLIDS CONTAINMENT WALL
-1
SCALE: 3/8"=1'-0" SECTION
EL 579.83 #5@12 OC 1'-6" #5@12 OC EF
#5@6 OC EF EL 575.83
#5@10 OC EF 1'-6"#5@10 OC EW
EL 575.83
1 1
3/4" PJF 1'-0"
-1
JB 24'-0"*
13'-2"*
CL 2 (E) COLUMS
CL 2 (E) COLUMS
CL 2 (E) COLUMS CL 2 (E) COLUMS1'-0"* 1'-0"*
1'-5" 1'-5"
1'-0"
REFER TO DETAIL 03032
00-S-004 (E) COL TS 5x5x5/16 W/ 11" SQ BASE PL
(TYP @ 4 LOCATIONS)
NOTES: 1. EXISTING STRUCTURE NOT SHOWN FOR CLARITY, SEE SECTION. 2. TEMPORARILY DISPLACE EXISTING CANOPY INCLUDING EXISTING

COLUMNS & CL BASE PLATES, TO ACCOMMODATE NEW
REINFORCED CONCRETE WALL AND SLAB AS SHOWN.
(E) SLUDGE DEWATERING

FOUNDATION
& WALL
SHEET NOTE: 1. SEE MECHANICAL DRAWINGS FOR BALANCE OF
INFORMATION.
11" 11"
1"
(TYP) 1" (TYP)
(4) 3/4"Ø SS THREADED
ANCHOR BOLTS W/ 8" EMBED, (TYP)
(E) 11" SQ COL & BASE PL W/ 3/4" NSG

PLAN VIEW
(TYP) 75-M-100

Page 337 of 1198 ends

CITY OF UKIAH

THICKENING AND DEWATERING

IMPROVEMENTS
89 3/7/23
SCALE: 1/2"=1'-0" SCREW PRESS PLAN
-1
SCALE: 1/2"=1'-0" SECTION
-1
75-S-002
PLANS AND SECTIONS 32 1" NSG
2" CLR
(TYP) 13" 3"
EL 577.52*
2 1/2" CLR
ADEKA P201 REFER TO DETAIL

FOR SURFACE PREP
6-#5 W/ STD HOOK &

ADHERED W/ HILTI HIT-RE
500 V3 EPOXY, (TYP)
(E) CONC SLAB 3"
EL 577.52* 2"
2 1/2" CLR
(TYP) 4-#5 W/ STD HOOK & ADHERED W/ HILTI HIT-RE 500 V3 EPOXY (TYP)
7/8"Ø SS HILTI ADHESIVE HIT-HY 200 V3 + HAS-R W/ 10" EMBED, (TYP) 1" NSG 2" CLR
(TYP)
4-#4 TIES W/ 135° HOOK
-2
SCALE: 1 1/2"=1'-0" SECTION
-3
SCALE: 1 1/2"=1'-0" SECTION
CL CL
14" SQ

PEDESTALS
(TYP OF 6)
WP
(TYP) ADEKA P201
(TYP)
1 1/2"x1 1/2" SQ FIBERGRATE MOLDED GRATING
(NOTES 1 THROUGH 4)
CL (4) PEDESTALS &
EQUIP ANCHORAGE CL (4) PEDESTALS
& EQUIP

ANCHORAGE
-2
-3
1 1/2"x1 1/2" SQ FIBERGRATE MOLDED GRATING
(NOTES 1 THROUGH 4)

NEW FIBERGRATE MOLDED GRATING
(TYP)

NEW EQUIP CONC PEDESTALS

ROUGHEN EXISTING CONC SLAB
TO A MINIMUM 1/4" AMPLITUDE NOTES: 1. CONCRETE PEDESTALS HEIGHT VARY DUE TO EXISTING SLAB SLOPE. 2. EXCAVATE EXISTING 6" CONCRETE CURB TO
ACCOMMODATE NEW EQUIPMENT PEDESTALS. 3. FIBERGRATE MOLDED GRATING NOT SHOWN FOR CLARITY. 6" EMBED (TYP) 6" EMBED (TYP) 11'-0"± 2'-9"± 2'-9"± 6"±
(TYP) 14'-0"± 2'-0"± 6"± (TYP) 7'-3"± 4'-3"± CL (2) PEDESTALS & EQUIP ANCHORAGE 9.1"* 51.18"* 72.05"* 43.31"* 3'-6"*, (TYP ES OF
SCREW PRESS) 3'-9 1/2"* 3'-5"* 8'-0" 2'-3" (MAX) 2'-6" (MAX) EQ
(2'-0"

MAX) EQ
EQ
(2'-0" EQ MAX)
NOTES: 1. AT GRATING ABUTMENTS, USE SS F-STYLE CLIPS SPACED AT 24" OC, MAXIMUM (OR APPROVED EQUAL). INSTALL PER MANUFACTURER'S RECOMMENDATIONS. 2. MOUNT GRATING TO CONCRETE CURBS WITH 1/4"Ø SS x 3 1/4" (MINIMUM) TAPCONS WITH M-STYLE CLIPS SPACED AT MINIMUM 24" OC OR (4) PER GRATE WITH 1 1/12" MINIMUM CONCRETE EMBEDMENT (OR APPROVED EQUAL). INSTALL PER MANUFACTURER'S RECOMMENDATIONS. 3. MOUNT GRATING TO ANGLE SUPPORTS WITH SS M-STYLE CLIPS, (2) MINIMUM AT EQUAL SPACED. (OR APPROVED EQUAL).

INSTALL PER MANUFACTURER'S RECOMMENDATIONS. 4. INSTALLATION SHALL COMPLY WITH MANUFACTURER'S RECOMMENDATIONS.

A
70-S-001
3/4"
(TYP)
FIBERGRATE SINGLE HEAD PN 561 PEDESTALS
(TYP @ 8 LOCATIONS) W/
(4) 3/8"Ø HILTI ADHESIVE HIT-HY 200 V3 + HIT-Z-R W/ 4" EMBED, (TYP) (OR APPROVED EQUAL)

SLUDGE DEWATERING

BUILDING PERIMETER WALL

FIBERGRATE QUAD HEAD
PN 563 PEDESTALS
(TYP @ 4 LOCATIONS)
(4) 3/8"Ø HILTI ADHESIVE HIT-HY 200 V3 + HIT-Z-R W/ 4" EMBED, (TYP) (OR APPROVED EQUAL)
(E) CONC CURB
(E) CONC SLAB

CL FIBER- GRATE

PEDESTALS CL FIBERGRATEPEDESTALS CL FIBERGRATE PEDESTALS CL FIBERGRATE PEDESTALS (TYP) CL GRATING SEAM (TYP ES OF SCREW PRESS)

CL FIBERGRATE

PEDESTALS
(E) CONC SLAB

SCREW PRESS
NOTE: 1. EXISTING CONCRETE SLAB REINFORCEMENT NOT SHOWN FOR CLARITY.

NOTE: 1. CONCRETE PEDESTALS HEIGHT VARY DUE TO EXISTING SLAB SLOPE. 13" 2'-6" (MAX) 3" CLR (E) CONC SLAB

EQUIP RAIL
0" EQUIP RAIL

EQUIP RAIL
1'-2"
(TYP) 1'-4"
7/8"Ø SS HILTI ADHESIVE HIT-HY 200 V3 + HAS-R W/ 10" EMBED, (TYP)

REFER TO SECTION
1 -
MATCH T.O. CURB
EL 577.52* EL 577.52* NEW EQUIP CONC PEDESTALS
(E) 6" CONC CURB
(TYP)
MATCH T.O. CURB

REFER TO DETAIL
(TYP OF 6)
06001
00-S-005
MATCH T.O. CURB
3 1/2"*
(TYP) 1'-4"
1" (MAX)
(TYP)
1" (MAX)
(TYP) FIBERGRATE MOLDED GRATING
75-M-100
CL (2) PEDESTALS & EQUIP ANCHORAGE CL (2) PEDESTALS & EQUIP ANCHORAGE CL EQUIP ANCHORAGE 4-#4 TIES W/ 135° HOOK 2" 2'-6" (MAX)
MATCH T.O. CURB 3" CLR

Page 338 of 1198 ends

XXXX X X X X X X X XXXX X X X X X X X X CITY OF UKIAH THICKENING AND DEWATERING IMPROVEMENTS 89 No. C60715 70-M-001 DAFT EQUIPMENT PLAN 33 PLANN

Page 339 of 1198 ends

8" WW 4" PSC CITY OF UKIAH THICKENING AND DEWATERING IMPROVEMENTS 89 No. C60715 70-M-002 DAFT SECTION 1 34 SECTION

Page 340 of 1198 ends

4" PSC 6" MS CITY OF UKIAH THICKENING AND DEWATERING IMPROVEMENTS 89 No. C60715 70-M-003 DAFT SECTION 2 35 SECTION

Page 341 of 1198 ends

X X X X X q48 5 1 4 2 3 6 5 7 7 XX X X X X X X XX X X X X CITY OF UKIAH THICKENING AND DEWATERING IMPROVEMENTS 89 No. C60715 70-M-004 DAFT EQUIPMENT GENERAL ARRANGEMENT PLAN 36 PLAN N 1234567

Page 342 of 1198 ends

CITY OF UKIAH THICKENING AND DEWATERING IMPROVEMENTS 89 No. C60715 70-M-005 DRAIN CONNECTION TO WET WELL 37 PLAN N

Page 343 of 1198 ends

CITY OF UKIAH THICKENING AND DEWATERING IMPROVEMENTS 89 No. C60715 75-M-100 SLUDGE DEWATERING BUILDING PLAN AND SECTIONS 38 PLAN SECTION

Page 344 of 1198 ends

CITY OF UKIAH THICKENING AND DEWATERING IMPROVEMENTS 89 No. C60715 MD001 MECHANICAL DETAILS 39 DETAIL DETAIL DETAIL

Page 345 of 1198 ends

ETM
00-E-001

SYMBOLS AND

ABBREVIATIONS
40 CITY OF UKIAH

THICKENING AND DEWATERING
IMPROVEMENTS No. E22550
3-8-23 Page 346 of 1198
00-E-002
GENERAL NOTES 41
“ ”

REFER TO SPECIFICATIONS FOR
ADDITIONAL REQUIREMENTS.

GENERAL NOTES

CITY OF UKIAH

THICKENING AND DEWATERING
IMPROVEMENTS No. E22550
3-8-23 Page 347 of 1198
00-E-003
ELECTRICAL DETAILS 1 42
DESCRIPTION FOR 2" CONDUIT
DESCRIPTION FOR 3" CONDUIT
DESCRIPTION FOR 2 1/2" CONDUIT

DESCRIPTION FOR CONCRETE MOUNT DESCRIPTION FOR STEEL MOUNT

CITY OF UKIAH

THICKENING AND DEWATERING
IMPROVEMENTS No. E22550

CONDUIT SLEEVE TRAPEZE SUPPORT EQUIPMENT CONCRETE PAD DETAIL EXPOSED CONDUIT TRANSITION DETAIL

CONDUIT TRAPEZE FROM MOUNTED TO CONCRETE CONDUIT TRAPEZE FROM MOUNTED TO STEEL CONDUIT SUPPORT - CONCRETE WALL OR STRUCTURE 3-8-23 Page 348 of 1198

DUCTBANK DETAIL - CONCRETE ENCLOSED

SIDE VIEW (SECTION)

TOP VIEW

ELECTRIC

UNDERGROUND JUNCTION BOX DETAIL (TYPICAL)

GROUND ROD AND WELL DETAIL (TYPICAL) UNCLASSFIED AREAS

EQUIPMENT RACK ON PAD DETAIL -

CONCRETE HANDHOLE WITH HINGED COVER
TYP. INSTRUMENT RACK WITH TRANSMITTERS

DUCTBANK DETAIL - CONCRETE ENCLOSED-UNDER ROADWAYS
00-E-004
ELECTRICAL DETAILS 2 43

CITY OF UKIAH

THICKENING AND DEWATERING
IMPROVEMENTS No. E22550
3-8-23 Page 349 of 1198
480V AC POWER

FROM MCC BUS
(MCC-)

RUNNING
G
A
00-E-005
MOTOR CONTROL SCHEMATICS 44

CITY OF UKIAH

THICKENING AND DEWATERING
IMPROVEMENTS No. E22550
3-8-23 Page 350 of 1198
00-E-006
CONDUIT AND CONDUCTOR SCHEDULE 45

CITY OF UKIAH

THICKENING AND DEWATERING
IMPROVEMENTS No. E22550

CONDUIT & CONDUCTOR SCHEDULE

TAG SIZE POWER CNTRL GND FROM TO REMARKS
FLOW INSTRUMENTS/ FIELD POWER AREA "70"
C70-00-01 1" 6#14 1#14 PLC70299 FLOW METER TRANSMITTERS WEST 120VAC POWER
VIA EXISTING CONDUIT XC70299C, HH70-S1/HH70-S1A
(RENAME CONDUIT WITH NEW CONDUIT TAG NUMBER)
C70-00-02 1" 3TSP IC 1#14 PLC70299 FLOW METER TRANSMITTERS WEST VIA EXISTING CONDUIT XC70299D, HH70-S1/HH70-S1A (RENAME CONDUIT WITH NEW CONDUIT TAG NUMBER)
C70-00-03 3/4" MFR
CABLE 1#14 FLOW METER TRANSMITTERS WEST PIPE FLOW TUBE DEVICES FIELD WIRING C70-00-04 3/4" MFR
CABLE 1#14 FLOW METER TRANSMITTERS WEST PIPE FLOW TUBE DEVICES FIELD WIRING C70-00-05 3/4" MFR
CABLE 1#14 FLOW METER TRANSMITTERS WEST PIPE FLOW TUBE DEVICES FIELD WIRING C70-00-06 1" 6#14 1#14 PLC-70299 POWER FLOW METERS EAST 120VAC POWER
VIA EXISTING CONDUIT XC70299C, HH70-S1/HH70-S1A
(RENAME CONDUIT WITH NEW CONDUIT TAG NUMBER)
C70-00-07 1" 3TSP IC 1#14 PLC-70299 FLOW METER TRANSMITTERS EAST VIA EXISTING CONDUIT XC70299D, HH70-S1/HH70-S1A (RENAME CONDUIT WITH NEW CONDUIT TAG NUMBER)
C70-00-08 3/4" MFR
CABLE 1#14 FLOW METER TRANSMITTERS EAST PIPE FLOW TUBE DEVICES FIELD WIRING C70-00-09 3/4" MFR
CABLE 1#14 FLOW METER TRANSMITTERS EAST PIPE FLOW TUBE DEVICES FIELD WIRING C70-00-10 3/4" MFR
CABLE 1#14 FLOW METER TRANSMITTERS EAST PIPE FLOW TUBE DEVICES FIELD WIRING P70-00-01 3/4" 2#12 1#12 HH70-P1 HH70-P1A/ LP-1 RE-PURPOSED LIGHTING CIRCUIT (RENAME CONDUIT WITH NEW CONDUIT TAG NUMBER)
P70-00-02 3/4" 2#12 1#12 HH70-P1 HH70-P1A/ LP-2 RE-PURPOSED LIGHTING CIRCUIT (RENAME CONDUIT WITH NEW CONDUIT TAG NUMBER)
SAF/ FROTH GENERATOR SKID. NO1 "70"
P70-01-01 1" 3#10 1#10 MCC70291 FROTH GENERATOR NO.1 DISC SW VIA EXISTING CONDUIT P70221A, HH70-P1/HH70-P1A (RENAME CONDUIT WITH NEW CONDUIT TAG NUMBER)
P70-01-02 1" 3#10 1#10 FROTH GENERATOR NO.1 DISC SW FROTH GENERATOR NO.1 P70-01-03 1" 3#12 1#12 FROTH GENERATOR NO.1 SAF NO.1 FLOC MIXER C70-01-01 1" 4#14 1#14 PLC70299 FROTH GENERATOR NO.1 VIA EXISTING CONDUIT C70221, C70221A HH70-P1/HH70-S1A (RENAME CONDUIT WITH NEW CONDUIT TAG NUMBER)
C70-01-02 1" PULL
STRING PLC70299 FROTH GENERATOR NO.1 SPARE CONDUIT
SAF/ FROTH GENERATOR SKID. NO2 "70"
P70-02-01 1" 3#10 1#10 MCC70292 FROTH GENERATOR NO.2 DISC SW VIA EXISTING CONDUIT P70222A, HH70-P1/HH70-P1A (RENAME CONDUIT WITH NEW CONDUIT TAG NUMBER)
P70-02-02 1" 3#10 1#10 FROTH GENERATOR NO.2 DISC SW FROTH GENERATOR NO.2 P70-02-03 1" 3#12 1#12 FROTH GENERATOR NO.2 SAF NO.2 FLOC MIXER C70-02-01 1" 4#14 1#14 PLC70299 SAF/FROTH GENERATOR CONTROL PANEL #2
VIA EXISTING CONDUIT C70222, C70222A HH70-P1/HH70-S1A
(RENAME CONDUIT WITH NEW CONDUIT TAG NUMBER)
C70-02-02 1" PULL
STRING PLC70299 SAF/FROTH GENERATOR CONTROLPANEL #2 SPARE CONDUIT CONNEX BUILDING XFRM & PANEL 70273A "70"
P70-03-01 1" 2#8 1#10 MCC70293 TRANSFORMER T70273 DISC SW VIA EXISTING CONDUIT P70223A, HH70-P1/HH70-P1A (RENAME CONDUIT WITH NEW CONDUIT TAG NUMBER)
P70-03-02 1" 2#8 1#10 TRANSFORMER T70273 DISC SW TRANSFORMER T70273 P70-03-03 1½" 3#2 1#4 TRANSFORMER T70273 240V PNL70273A SAF POLYMER SYSTEM NO.1 AREA "70"
P70-04-01 3/4" 2-#10 1#10 208V PNL70271 IN MCC70291 SAF POLYMER #1 CONTROL PANEL CKT 31 C70-04-01 1" 8#14 1#14 SAF POLYMER #1 CONTROL PANEL PLC70299 IN REMOTE, RUN, FAIL, START/STOP CMD SIGNALS C70-04-02 1" 2TSP SAF POLYMER #1 CONTROL PANEL PLC70299 SPEED CONTROL, SPEED FEEDBACK SAF POLYMER SYSTEM NO.2 AREA "70"
P70-05-01 3/4" 2-#10 1#10 208V PNL70272 IN MCC70292 SAF POLYMER #2 CONTROL PANEL CKT 31 C70-05-01 1" 8#14 1#14 SAF POLYMER #2 CONTROL PANEL PLC70299 IN REMOTE, RUN, FAIL, START/STOP CMD SIGNALS C70-05-02 1" 2TSP SAF POLYMER #2 CONTROL PANEL PLC70299 SPEED CONTROL, SPEED FEEDBACK WASHWATER RECOVERY POND AREA "12"
P12-01-01 1'' 3#10 1#10 MCC12191 VFD93111 IN POWER GENERATION BUILDING P12-01-02 1-1/2" 3/C#10 VFD
CABLE 1#10 VFD93111 TB93111 VIA 12HH-1, 12HH-2
C12-01-01 1" 2TSP 1CAT6 1#12 VFD93111 PLC12199 SPEED CONTROL, SPEED FEEDBACK, ETHERNET COMMS C12-01-02 1" 10#14 1#14 VFD93111 PLC12199 START/STOP CMD, READY, RUN, LEAK, OL, HIGH TEMP C12-01-03 1" 12/C#14 1#14 VFD93111 TB93111 VIA 12HH-1, 12HH-2 P12-02-01 1" 3#10 1#10 MCC12191 VFD93121 IN POWER GENERATION BUILDING P12-02-02 1-1/2" 3/C#10 VFD
CABLE 1#10 VFD93121 TB93121 VIA 12HH-1, 12HH-2
C12-02-01 1" 2TSP 1CAT6 1#12 VFD93121 PLC12199 SPEED CONTROL, SPEED FEEDBACK, ETHERNET COMMS C12-02-02 1" 10#14 1#14 VFD93121 PLC12199 START/STOP CMD, READY, RUN, LEAK, OL, HIGH TEMP C12-02-03 1" 12/C#14 1#14 VFD93121 TB93121 VIA 12HH-1, 12HH-2 P12-03-02 1" 3#10 1#10 MCC12192 VFD93112 IN POWER GENERATION BUILDING P12-03-02 1-1/2" 3/C#10 VFD
CABLE 1#10 VFD93112 TB93112 VIA 12HH-1, 12HH-2
C12-03-01 1" 2TSP 1CAT6 1#12 VFD93112 PLC12199 SPEED CONTROL, SPEED FEEDBACK, ETHERNET COMMS C12-03-02 1" 10#14 1#14 VFD93112 PLC12199 START/STOP CMD, READY, RUN, LEAK, OL, HIGH TEMP C12-03-03 1" 12/C#14 1#14 VFD93112 TB93112 VIA 12HH-1, 12HH-2 P12-04-01 1" 3#10 1#10 MCC12192 VFD93122 IN POWER GENERATION BUILDING P12-04-02 1-1/2" 3/C#10 VFD
CABLE
1#10 VFD93122 TB93122 VIA 12HH-1, 12HH-2
C12-04-01 1" 2TSP 1CAT6 1#12 VFD93122 PLC12199 SPEED CONTROL, SPEED FEEDBACK, ETHERNET COMMS C12-04-02 1" 10#14 1#14 VFD93122 PLC12199 START/STOP CMD, READY, RUN, LEAK, OL, HIGH TEMP C12-04-03 1" 12/C#14 1#14 VFD93122 TB93122 VIA 12HH-1, 12HH-2 P12-05-01 2" PULL
STRING
POWER GENERATION BLDG. 12HH-2 SPARE CONDUIT FOR FUTURE USE (VIA 12HH-1) C12-05-01 2" PULL
STRING
POWER GENERATION BLDG. 12HH-2 SPARE CONDUIT FOR FUTURE USE (VIA 12HH-1) CLARIFIER AREA "31"
P31-01-01 1" 3#10 1#10 MCC31291 VFD27201 IN TRICKLING FILTER ELECTRICAL BUILDING P31-01-02 1'' 3/C#10 VFD
CABLE
1#10 VFD27201 MCC31291 POWER OUTPUT FROM VFD TO MCC
P31-01-03 1" 3/C#10 VFD
CABLE
1#10 MCC31291 TB27201 VIA EXISTING CONDUIT P27201A, HH27-P2 (RENAME CONDUIT WITH NEW TAG NUMBER)
C31-01-01 1" 2TSP 1CAT6 1#12 VFD27201 PLC31299 SPEED CONTROL, SPEED FEEDBACK, ETHERNET COMMS C31-01-02 1" 10#14 1#14 VFD27201 PLC31299 START/STOP CMD, READY, RUN, LEAK, OL, HIGH TEMP C31-01-03 1" 12/C#14 1#14 VFD27201 MCC31291 RUN CONTINUOUS BETWEEN VFD27201 & TB27201 C31-01-04 1" 12/C#14 1#14 MCC31291 TB27201 VIA EXISTING CONDUIT C27201A, HH27-S2 (RENAME CONDUIT WITH NEW TAG NUMBER)
P31-02-01 1" 3#10 1#10 MCC31292 VFD27202 IN TRICKLING FILTER ELECTRICAL BUILDING P31-02-02 1'' 3/C#10 VFD
CABLE
1#10 VFD27202 MCC31292 POWER OUTPUT FROM VFD TO MCC
P31-02-03 1" 3/C#10 VFD
CABLE
1#10 MCC31292 TB27202 VIA EXISTING CONDUIT P27202A, HH27-P2 (RENAME CONDUIT WITH NEW TAG NUMBER)
C31-02-01 1" 2TSP 1CAT6 1#12 VFD27202 PLC31299 SPEED CONTROL, SPEED FEEDBACK, ETHERNET COMMS C31-02-02 1" 10#14 1#14 VFD27202 PLC31299 START/STOP CMD, READY, RUN, LEAK, OL, HIGH TEMP C31-02-03 1" 12/C#14 1#14 VFD27202 MCC31292 RUN CONTINUOUS BETWEEN VFD27202 & TB27202 C31-02-04 1" 12/C#14 1#14 MCC31292 TB27202 VIA EXISTING CONDUIT C27202A, HH27-S2 (RENAME CONDUIT WITH NEW TAG NUMBER)
P31-03-01 1" 3#10 1#10 MCC31293 VFD27203 IN TRICKLING FILTER ELECTRICAL BUILDING P31-03-02 1'' 3/C#10 VFD
CABLE
1#10 VFD27203 MCC31293 POWER OUTPUT FROM VFD TO MCC
P31-03-03 1" 3/C#10 VFD
CABLE
1#10 MCC31293 TB27203 VIA EXISTING CONDUIT P27203A, HH27-P2 (RENAME CONDUIT WITH NEW TAG NUMBER)
C31-03-01 1" 2TSP 1CAT6 1#12 VFD27203 PLC31299 SPEED CONTROL, SPEED FEEDBACK, ETHERNET COMMS C31-03-02 1" 10#14 1#14 VFD27203 PLC31299 START/STOP CMD, READY, RUN, LEAK, OL, HIGH TEMP C31-03-03 1" 12/C#14 1#14 VFD27203 MCC31293 RUN CONTINUOUS BETWEEN VFD27203 & TB27203 C31-03-04 1" 12/C#14 1#14 MCC31293 TB27203 VIA EXISTING CONDUIT C27203A, HH27-S2 (RENAME CONDUIT WITH NEW TAG NUMBER)
P31-04-01 1" 3#10 1#10 MCC31294 VFD27204 IN TRICKLING FILTER ELECTRICAL BUILDING P31-04-02 1'' 3/C#10 VFD
CABLE
1#10 VFD27204 MCC31294 POWER OUTPUT FROM VFD TO MCC
P31-04-03 1" 3/C#10 VFD
CABLE
1#10 MCC31294 TB27204 VIA EXISTING CONDUIT P27204A, HH27-P2 (RENAME CONDUIT WITH NEW TAG NUMBER)
C31-04-01 1" 2TSP 1CAT6 1#12 VFD27204 PLC31299 SPEED CONTROL, SPEED FEEDBACK, ETHERNET COMMS C31-04-02 1" 10#14 1#14 VFD27204 PLC31299 START/STOP CMD, READY, RUN, LEAK, OL, HIGH TEMP C31-04-03 1" 12/C#14 1#14 VFD27204 MCC31294 RUN CONTINUOUS BETWEEN VFD27204 & TB27204 C31-04-04 1" 12/C#14 1#14 MCC31294 TB27204 VIA EXISTING CONDUIT C27204A, HH27-S2 (RENAME CONDUIT WITH NEW TAG NUMBER)
DEWATERING AREA "75"
P75-01-01 3/4" 3#10 1#10 PANEL "B" POLYMETER SYSTEM
C75-01-01 3/4" 8#14 1#14 MCP75001 LCP75020 AUTO, RUNNING, TROUBLE, START/STOP C75-01-02 3/4" TSP MCP75001 LCP75020
P75-02-01 1-1/2" 3#4 1#8 MCC-D MCP75001
P75-02-02 1" 3#8 1#10 MCP75001 (E) P75010
P75-02-03 3/4" 3#12 1#12 MCP75001 M75001
P75-02-04 3/4" 3#12 1#12 MCP75001 M75030
P75-02-05 3/4" 3#12 1#12 MCP75001 (E) C75040
P75-02-06 3/4" 3#12 1#12 MCP75001 (E) C75050
C75-02-01 1" CAT6 MCP75001 PLC75001
C75-02-02 3/4" 2#14 1#14 MCP75001 FLOC LE 75-001 DISCRETE SIGNAL C75-02-03 3/4" MCP75001 SCREW PRESS ANALOG SIGNAL TO LEVEL TRANSMITTER C75-02-04 3/4" 2#14 1#14 MCP75001 SLUDGE FLOWMETER POWER 120V FROM MCP75001 C75-02-05 3/4" TSP MCP75001 FIT75010
C75-02-06 3/4" 2#14 1#14 MCP75001 (E)SLUDGE FEED PUMP TEMPERATURE SWITCH ** INSTALL IN

NIPPLES/WIRE
WAYS

INDICATED IN
ELEVATION(S).

CONDUIT & CONDUCTOR SCHEDULE

TAG SIZE POWER CNTRL GND FROM TO REMARKS
3-8-23 Page 351 of 1198

SECONDARY
CLARIFIER 1

TRICKLING
SECONDARY FILTER 2

CLARIFIERS

ELECTRICAL BUILDING

SECONDARY
CLARIFIER 2

TRICKLING
FILTER 1
SOLIDS CONTACT TANK 1
SOLIDS CONTACT TANK 2

TRICKLING FILTER

PUMPING STATION

RECLAIMED WATER PUMPING

STATION

AERATION
BLOWER

BUILDING

DIGESTER
2 DIGESTER
1 MECHANICAL

EQUIPMENT

BUILDING
WSS

PUMPING

STATION
FUTURE

TRICKLING
FILTER 3
PLANT

ENTRANCE
PLANT
ROAD
ANIMAL

SHELTER

OPERATIONS

BUILDING
SLUDGE

DEWATERING

FACILITY

CONSTRUCTION STAGING
YARD
FUTURE

DIGESTER
3 STORM DRAIN PUMPING

STATION

MAINTENANCE

BUILDING

TEMPORARY

DEWATERING

FACILITY

ADVANCED WATER TREATMENT FACILITY

HEADWORKS

ELECTRICAL

BUILDING

PRIMARY

CLARIFIERS

TRICKLING FILTER

ELECTRICAL

BUILDING

CITY OF UKIAH

THICKENING AND DEWATERING
IMPROVEMENTS No. E22550
01-E-100
ELECTRICAL SITE 1 OF 2 AREA PLAN 46
ELECTRICAL SITE 1 OF 2 AREA PLAN
MATCHLINE -REFER TO 01-E-101 FOR CONTINUATION

GENERAL NOTES
3-8-23 Page 352 of 1198

DISSOLVED AIR FLOTATION
AREA

CHLORINATION

FACILITY

WASHWATER RECOVERY
POND 2

WASHWATER RECOVERY
POND 1
POWER

GENERATION

BUILDING

ADVANCED WATER TREATMENT FACILITY

CITY OF UKIAH

THICKENING AND DEWATERING
IMPROVEMENTS No. E22550
01-E-101
ELECTRICAL SITE 2 OF 2 AREA PLAN 47
ELECTRICAL SITE 2 OF 2 AREA PLAN
MATCHLINE -REFER TO 01-E-100 FOR CONTINUATION

GENERAL NOTES
3-8-23 Page 353 of 1198
(E) MECHANICAL

EQUIPMENT

BUILDING
(E) PRIMARY

CLARIFIERS
(E) TRICKLING FILTER

ELECTRICAL

BUILDING

CITY OF UKIAH

THICKENING AND DEWATERING
IMPROVEMENTS No. E22550
01-E-200
ENLARGED PRIMARY CLARIFIER AREA 48

KEY NOTES

GENERAL NOTES

CLARIFIER AREA & TRICKLING FILTER ELECTRICAL BUILDING CLARIFIER AREA 3-8-23 Page 354 of 1198
(E) WASHWATER RECOVERY
POND 2

WASHWATER
RECOVERY POND 1
(E) POWER

GENERATION

BUILDING

CITY OF UKIAH

THICKENING AND DEWATERING
IMPROVEMENTS No. E22550
01-E-201

ENLARGED WASHWATER

RECOVERY POND AREA
49 ELECTRICAL SITE RECOVERY POND AREA

KEY NOTES
WASHWATER RECOVERY POND 1 PUMP STATION PLAN
WASHWATER RECOVERY POND 2 PUMP STATION PLAN

GENERAL NOTES
DUCT BANK CROSS SECTION "A"
DUCT BANK CROSS SECTION "B"
DUCT BANK CROSS SECTION "C"
3-8-23 Page 355 of 1198

CITY OF UKIAH

THICKENING AND DEWATERING
IMPROVEMENTS No. E22550
12-E-101

POWER GENERATION

BUILDING PLAN
50 ENLARGED POWER GENERATION BUILDING PLAN

KEY NOTES

GENERAL NOTES
3-8-23 Page 356 of 1198

CITY OF UKIAH

THICKENING AND DEWATERING
IMPROVEMENTS No. E22550
12-E-102
MCC12191 ONE LINE DIAGRAM 51

GENERAL NOTES

KEY NOTES - DEMO NOTES

KEY NOTES
3-8-23 Page 357 of 1198

CITY OF UKIAH

THICKENING AND DEWATERING
IMPROVEMENTS No. E22550
12-E-103
MCC12192 ONE LINE DIAGRAM 52

GENERAL NOTES

KEY NOTES - DEMO NOTES

KEY NOTES
3-8-23 Page 358 of 1198

CITY OF UKIAH

THICKENING AND DEWATERING
IMPROVEMENTS No. E22550
12-E-104
MCC12191 & MCC12192 ELEVATIONS 53
(E) MCC 12191 - ELEVATION VIEW

MCC SECTION TABLE
TAG#

MCC SECTION TABLE
TAG#

GENERAL NOTES

KEY NOTES
(E) MCC 12192 - ELEVATION VIEW

MCC SECTION TABLE
TAG#
3-8-23 Page 359 of 1198

CITY OF UKIAH

THICKENING AND DEWATERING
IMPROVEMENTS No. E22550
31-E-101

ENLARGED TRICKLING FILTER

BUILDING PLAN
54 ENLARGED TRICKLING FILTER BUILDING

KEY NOTES

GENERAL NOTES
3-8-23 Page 360 of 1198

CITY OF UKIAH

THICKENING AND DEWATERING
IMPROVEMENTS No. E22550
31-E-102
MCC31291 ONE LINE DIAGRAM 55

GENERAL NOTES

KEY NOTES - DEMO NOTES

KEY NOTES
3-8-23 Page 361 of 1198

CITY OF UKIAH

THICKENING AND DEWATERING
IMPROVEMENTS No. E22550
31-E-103
MCC31292 ONE LINE DIAGRAM 56

GENERAL NOTES

KEY NOTES - DEMO NOTES

KEY NOTES
3-8-23 Page 362 of 1198

CITY OF UKIAH

THICKENING AND DEWATERING
IMPROVEMENTS No. E22550
31-E-104
MCC31293 ONE LINE DIAGRAM 57

GENERAL NOTES

KEY NOTES - DEMO NOTES

KEY NOTES
3-8-23 Page 363 of 1198

CITY OF UKIAH

THICKENING AND DEWATERING
IMPROVEMENTS No. E22550
31-E-105
MCC31294 ONE LINE DIAGRAM 58

GENERAL NOTES

KEY NOTES - DEMO NOTES

KEY NOTES
3-8-23 Page 364 of 1198

CITY OF UKIAH

THICKENING AND DEWATERING
IMPROVEMENTS No. E22550
31-E-106
MCC31291 & MCC31292 ELEVATIONS 59
(E) MCC 31291 - ELEVATION VIEW

MCC SECTION TABLE
TAG#

MCC SECTION TABLE
TAG#

GENERAL NOTES

KEY NOTES
(E) MCC 31292 - ELEVATION VIEW

MCC SECTION TABLE
TAG#

MCC SECTION TABLE
TAG#
3-8-23 Page 365 of 1198

CITY OF UKIAH

THICKENING AND DEWATERING
IMPROVEMENTS No. E22550
31-E-107
MCC31293 & MCC31294 ELEVATIONS 60
(E) MCC 31293 - ELEVATION VIEW

MCC SECTION TABLE
TAG#

MCC SECTION TABLE
TAG#

GENERAL NOTES

KEY NOTES
(E) MCC 31294 - ELEVATION VIEW

MCC SECTION TABLE
TAG#

MCC SECTION TABLE
TAG#
3-8-23 Page 366 of 1198
HH70-S1
HH70-P1
PVL70241
PVL70242
PIT70241
LSHH70241
LSLL70241
LSH70241
LSL70241
SV70231
SV70241
PNL70241
PNL70242
PIT70242
LSHH70242
LSLL70242
LSH70242
LSL70242
SV70232
SV70242

TO LIGHTPOLE

DISSOLVED AIR

FLOTATION
THICKENER 1
CLASS 1, DIV. 2

GROUP D

DISSOLVED AIR

FLOTATION
THICKENER 2
CLASS 1, DIV. 2

GROUP D
P70223
JB70263
TB70223
HS70223
FSL7063
CV70263
JB70262
TB70222
HS70222
FSL7062
CV70262
P70222
JB70261
TB70221
HS70221
FSL7061
CV70261
P70221

G G G G G G G G G G G G G G G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G

G G G G
G G
G
G
G
G
G G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
70-E-100
DAFT AREA DEMO PLAN 61

GENERAL NOTES

KEY PLAN

THIS SHEET

CITY OF UKIAH

THICKENING AND DEWATERING
IMPROVEMENTS No. E22550

KEY NOTES
N
3-8-23 Page 367 of 1198
MME70251 MME70252
(E) SWB70282 (E) SWB70281
(E) MCC70293
(E) MCC70292 (E) MCC70291
CP70201 CP70202
(E) AFD70121A (E) AFD70122A
(E) PLC70299

G G G G G G G G G G G G G G G G G G

G G G G G G G G G G G G G G G G G
G
G
G
G
G
G
G
G
G
G
G
G
G
G

G G G G G G G G G G G G G G G G

G G G G G G G G G G G G G G G G G G G

G G G G G G G G G G G G G G G G G G
GG
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
CP70203
(E)
HH70-P5
(E)
AFD97101
(E)
AFD97102
(E)
AFD70131
(E)
AFD70132
(E)
AFD70133
70-E-101
DAFT BUILDING DEMO PLAN 62

KEY NOTES

GENERAL NOTES

CITY OF UKIAH

THICKENING AND DEWATERING
IMPROVEMENTS No. E22550
N

KEY PLAN

THIS SHEET
3-8-23 Page 368 of 1198
(E)
HH70-P5

CITY OF UKIAH

THICKENING AND DEWATERING
IMPROVEMENTS No. E22550
70-E-102
ENLARGED DAFT BUILDING PLAN 63

KEY NOTES

GENERAL NOTES
MATCHLINE -REFER TO 01-E-103 FOR CONTINUATION

ENLARGED DAFT BUILDING PLAN

KEY PLAN

THIS SHEET
3-8-23 Page 369 of 1198
70-E-103
ENLARGED SAF 1 AREA
PLAN
64 KEY NOTES
MATCHLINE REFER TO DRAWING 70-E-104 FOR CONTINUATION GENERAL NOTES

DISSOLVED AIR

FLOATING
THICKER 1
CLASS 1, DIV.2

GROUP D

CITY OF UKIAH

THICKENING AND DEWATERING
IMPROVEMENTS No. E22550
MATCHLINE REFER TO DRAWING 70-E-102 FOR CONTINUATION

SAF AREA PLAN-ENLARGED AREA

KEY PLAN

THIS SHEET
3-8-23 Page 370 of 1198

CITY OF UKIAH

THICKENING AND DEWATERING
IMPROVEMENTS No. E22550
70-E-104
ENLARGED SAF 2 AREA
PLAN
65 GENERAL NOTES
MATCHLINE REFER TO DRAWING 70-E-103 FOR CONTINUATION

DISSOLVED AIR

FLOATING
THICKER 2
CLASS 1, DIV.2

GROUP D

KEY NOTES

KEY PLAN

THIS SHEET
N
3-8-23 Page 371 of 1198

G G G G G G G G G G G G G

G G G G G G G G G G G G G G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G

G G G G
G
G
G
G
G
G
G

CITY OF UKIAH

THICKENING AND DEWATERING
IMPROVEMENTS No. E22550
70-E-105

SAF AREA

GROUNDING PLAN
66 KEY NOTES

GENERAL NOTES
N

KEY PLAN

THIS SHEET
3-8-23 Page 372 of 1198
70-E-110
MCC 70291 ONE LINE DEMO 67

KEY NOTES - DEMO NOTES

GENERAL NOTES

CITY OF UKIAH

THICKENING AND DEWATERING
IMPROVEMENTS No. E22550
3-8-23 Page 373 of 1198
70-E-111
MCC 70292 ONE LINE DEMO 68

GENERAL NOTES

KEY NOTES - DEMO NOTES

CITY OF UKIAH

THICKENING AND DEWATERING
IMPROVEMENTS No. E22550
3-8-23 Page 374 of 1198
70-E-112
MCC 70293 ONE LINE DEMO 69

DEMOLITION NOTES

GENERAL NOTES

CITY OF UKIAH

THICKENING AND DEWATERING
IMPROVEMENTS No. E22550
3-8-23 Page 375 of 1198
70-E-113
MCC 70291 ONE LINE 70

KEY NOTES

GENERAL NOTES

CITY OF UKIAH

THICKENING AND DEWATERING
IMPROVEMENTS No. E22550
3-8-23 Page 376 of 1198

CITY OF UKIAH

THICKENING AND DEWATERING
IMPROVEMENTS No. E22550
70-E-114
MCC 70292 ONE LINE 71

GENERAL NOTES

KEY NOTES
3-8-23 Page 377 of 1198

CITY OF UKIAH

THICKENING AND DEWATERING
IMPROVEMENTS No. E22550
70-E-115
MCC 70293 ONE LINE 72

KEY NOTES

GENERAL NOTES
3-8-23 Page 378 of 1198
(E) MCC 70291 - ELEVATION VIEW
70-E-116
MCC 70291 ELEVATION 73

GENERAL NOTES
LOAD SUMMARY MCC70291
FAC/AREA (ZONE/SITE):

EQUIPMENT LOCATION: ELECTRICAL EQUIPMENT ROOM TAG NAME:

FED FROM: SWBD70281 AND SWBD70282
MANUFACTURER: SQUARE D MODEL 6
VOLTS/PHASE/WIRE: MAIN
BUS RATING: MAIN BREAKER
(AMPS): AIC RATING (AMPS):

MAIN LUG ONLY:

SECTION
NO. EQUIPMENT NAME KVA HP FLA

BREAKER

TRIP RATING
1D P75111 7.5 11.0
1E COL70121A 3/4 1.6
1H POWER MONITOR 0.05 0.1
2E MX75101 7.5 11.0
2M PNL70271 TRANSFORMER 15 18.0
4B P60211 1/2 1.1
4D COL70121B 1.5 3
5C GDR75112 3 4.8
5D P97101 20 27.0
6A FROTH GENERATOR CONTROL PANEL NO.1 7.5 11.0
6E P8011 20.0 27.0
6F P70131 7.5 11.0
SUBTOTAL: 126.6
PLUS 25% OF LARGEST MOTOR: 6.8
TOTAL AMPS 133.4

MCC SECTION TABLE
TAG#

KEY NOTES

CITY OF UKIAH

THICKENING AND DEWATERING
IMPROVEMENTS No. E22550
3-8-23 Page 379 of 1198
(E) MCC 70292 - ELEVATION VIEW
70-E-117
MCC 70292 ELEVATION 74

GENERAL NOTES

KEY NOTES

SECTION
NO. EQUIPMENT NAME KVA HP FLA

BREAKER

TRIP RATING
1G P60213 1/2 1.1
1H POWER MONITOR 0.05 0.1
2B COL70122B 1.5 3
2D P75121 1.5 3
2F P80112 1.5 3
2M PNL70272 TRANSFORMER 15 18
4E MX75102 7.5 11
4J COL70122A 3/4 1.6
4K P70132 7.5 11
5C MME60202 1/5 1
5F MME60401 1/2 1.1
6C FROTH GENERATOR CONTROL PANEL NO.2 7.5 11
6F GDR75122 3 4.8
SUBTOTAL: 69.7
PLUS 25% OF LARGEST MOTOR: 6.8
TOTAL AMPS 76.5
LOAD SUMMARY MCC70292
FAC/AREA (ZONE/SITE):

EQUIPMENT LOCATION: ELECTRICAL EQUIPMENT ROOM TAG NAME:

FED FROM: SWBD70281 AND SWBD70282
MANUFACTURER: SQUARE D MODEL 6
VOLTS/PHASE/WIRE: MAIN
BUS RATING: MAIN BREAKER
(AMPS): AIC RATING (AMPS):

MAIN LUG ONLY:

MCC SECTION TABLE
TAG#

CITY OF UKIAH

THICKENING AND DEWATERING
IMPROVEMENTS No. E22550
3-8-23 Page 380 of 1198
(E) MCC 70293 - ELEVATION VIEW
70-E-118
MCC 70293 ELEVATION 75

KEY NOTES

MCC SECTION TABLE MCC SECTION TABLE

GENERAL NOTES
VOLTS/PHASE/WIRE: MAIN
BUS RATING: MAIN BREAKER
(AMPS): AIC RATING (AMPS):

MAIN LUG ONLY:

LOAD SUMMARY MCC70293
FAC/AREA (ZONE/SITE):

EQUIPMENT LOCATION: ELECTRICAL EQUIPMENT ROOM TAG NAME:

FED FROM: SWBD70281 AND SWBD70282
MANUFACTURER: SQUARE D MODEL 6

SECTION
NO. EQUIPMENT NAME KVA HP FLA

BREAKER

TRIP RATING
1C CHLORINE RESIDUAL SAMPLE PUMP P60411 0.5 1.1
1F SODIUM HYPOCHLORITE INDUCTION UNIT 1 MEME60201 0.5 1.1 1H RECLAIMED WATER FILTER FEED PUMP 3 P80113 20 27.0
2A
DAFT EQUIP. BUILDING MCC ROOM AIR HANDLING UNIT
AHU70246 13.4 17.0
2B RIVER DISCHARGE CONTROL VALVE 1 2.1
2C STROM DRAIN PUMP STATION NO. B CONTROL PANEL 4 6.8
2E THICKENED SLUDGE PUMP 3 P70133 7.5 11.0
2H RECLAIMED WATER FILTER CONTROL PANEL PNL80144
2J DRAINAGE PUMP 2 P97102 20 27.0
4C CHLORINATION AERATION BLOWER B60221 20 27.0
4M 15KVA TRANSFORMER TO PANEL 70273A 15 31.3
5D CHLORINE RESIDUAL SAMPLE PUMP P60215 0.5 1.1
5M 15KVA TRANSFOMER- PANEL 70273 15 18.0
7D DAFT EQUIP. BUILDING MCC ROOM UNIT HEATER UH70244 20.1 27.0 7J POWER METER 0.05 0.1
SUBTOTAL: 305.1
PLUS 25% OF LARGEST MOTOR: 6.8
TOTAL AMPS 311.9

CITY OF UKIAH

THICKENING AND DEWATERING
IMPROVEMENTS No. E22550
3-8-23 Page 381 of 1198
70-E-119
PANEL SCHEDULES 76

GENERAL NOTES

KEY NOTES
VOLTS 120/208V PANEL (E) PNL70271 MAIN 225A MCB
PHASE 3PH, 4 WIRE LOCATION MCC 70291 BUS 225A
A.I.C. FED FROM 15KVA TRANFORMER IN 2L MOUNTING SURFACE

LOAD VA LOAD LOAD
DESCRIPTION LTG REC MTR AMP P NO. A B C NO. AMP P MTR REC LTG DESCRIPTION P60321 (PNL60321) 20 1 1 600
50 2 20 1 FIT7521
P60341 (PNL60341) 20 1 3 100
50 4 20 1 FIT7025
LTG-DIGESTERS 1 20 1 5 173
50 6 20 1 FIT7041
RECPT-DIGESTERS 1 20 1 7 180
160 8 20 1 1 DAFT DECK LIGHTING
FIT6031 20 1 9 50
1800 10 20 1 1 DAFT TANK LIGHTING
LIT6011 20 1 11 50
360 12 20 1 2 DAFT TANK RECEPT
PNL60301 20 1 13 600
1120 14 20 1 1 DAFT BLDG INT LTG
PNL60331 20 1 15 600
1120 16 20 1 1 DAFT BLDG INT LTG
FIT8001 20 1 17 50
720 18 20 1 4 DAFT BLDING INT RECEP
FIT8002 20 1 19 50
720 20 20 1 4 DAFT BLDING INT RECEP
MME60212 (AIT6004) 20 1 21 100
250 22 20 1 RR MINI WTR HTR
SPARE 20 1 23 0
100 24 20 1 LCP70272
SPARE 20 1 25 0
0 26 20 1 PNL70241
SPARE 20 1 27 0
0 28 20 1 CV70261
SPARE 20 1 29 0
500 30 20 1 PLC70299
SAF NO.1 POLYMER SYSTEM 1 30 1 31 1440
-- 32 SPACE
SPACE 33 --
-- 34 SPACE
SPACE 35 2160
-- 36 SPACE
SPACE 37 --
60 3 SURGE PROTECTION DEVICE
10 38
SPACE 39 -- 10 40
SPACE 41 -- 10 42
13183 VA - 3PH TOTAL CONNECTED 4930 4080 4173
7973 VA - CONTINUOUS X 0.25 (*) = 1993 VA
1980 VA - GP RECEPTS X (**) = 1980 VA
3230 VA - NON-CONTIN X 1.00 = 3230 VA
(* INCLUDES LIGHTING & LARGEST MOTOR) 16783 FEEDER TOTAL (VA) (***) (** 100% OF FIRST 10KW + 50% OF BALANCE) 11 TOTAL RECEPTACLES (*** THREE TIMES LARGEST PHASE + 25% OF CONTINUOUS - 50% OF REC VA OVER 10KVA) 47 LARGEST PHASE CURRENT 3/8/2023 10:37 COMMENT:

VOLTS 120/208V PANEL (E) PNL70272 MAIN 225A MCB
PHASE 3PH, 4 WIRE LOCATION MCC 70292 BUS 225A
A.I.C. FED FROM 15KVA TRANFORMER IN 2L MOUNTING SURFACE

LOAD VA LOAD LOAD
DESCRIPTION LTG REC MTR AMP P NO. A B C NO. AMP P MTR REC LTG DESCRIPTION P60322 (PNL60322) 20 1 1 600
50 2 20 1 FIT7522
P60342 (PNL60342) 20 1 3 100
300 4 20 1 CV75142 (PNL75142)
FIT6033 20 1 5 50
50 6 20 1 FIT7545
FIT6002 20 1 7 50
50 8 20 1 FIT7026
LIT6001 20 1 9 50
50 10 20 1 FIT7042
LIT6012 20 1 11 50
590 12 20 1 1 NORTH DAFT AREA LTG
LIT9711 20 1 13 50
360 14 20 1 2 NORTH DAFT AREA REC
LTG-ROADWAY 1 20 1 15 604
590 16 20 1 1 SOUTH DAFT AREA LTG
SPARE 20 1 17 0
360 18 20 1 2 SOUTH DAFT AREA REC
HEAT TRACE 20 1 19 500
285 20 20 1 1 DAFT BLDG EXT LTG
SPACE 21 -- 295 22 20 1 1 DAFT BLDG ARE LTG
SPACE 23 -- 180 24 20 1 1 DAFT BLDG AREA REC
SAMPLE PUMP 20 1 25 1200
500 26 20 1
SPACE 27 -- 50 28 20 1
MME60214 (AIT6005) 20 1 29 100
600 30 20 1 SMP60216
SAF NO.2 POLYMER SYSTEM 1 30 1 31 1440
-- 32 SPACE
SPACE 33 --
-- 34 SPACE
SPACE 35 --
-- 36 SPACE
SPACE 37 --
60 3 SURGE PROECTION DEVICE
10 38
SPACE 39 -- 10 40
SPACE 41 -- 10 42
9134 VA - 3PH TOTAL CONNECTED 5095 2049 1990
3804 VA - CONTINUOUS X 0.25 (*) = 951 VA
900 VA - GP RECEPTS X (**) = 900 VA
4430 VA - NON-CONTIN X 1.00 = 4430 VA
(* INCLUDES LIGHTING & LARGEST MOTOR) 16236 FEEDER TOTAL (VA) (***) (** 100% OF FIRST 10KW + 50% OF BALANCE) 5 TOTAL RECEPTACLES (*** THREE TIMES LARGEST PHASE + 25% OF CONTINUOUS - 50% OF REC VA OVER 10KVA) 45 LARGEST PHASE CURRENT 3/8/2023 10:37 COMMENT:

PNL70242 SPARE
CV70262 SPARE
VOLTS 120/208V PANEL (E) PNL70273 MAIN 225A MCB
PHASE 3PH, 4 WIRE LOCATION MCC 70293 BUS 225A
A.I.C. FED FROM 15KVA TRANFORMER IN 5L MOUNTING SURFACE

LOAD VA LOAD LOAD
DESCRIPTION LTG REC MTR AMP P NO. A B C NO. AMP P MTR REC LTG DESCRIPTION LSL8011 20 1 1 100
600 2 20 1 PNL75131
PLC70299 20 1 3 500
0 4 20 1 SPARE
LTG-CHEM DISINFECTION 1 20 1 5 500
600 6 20 1 PNL75140
REC-CHEM DISINFECTION 3 20 1 7 540
1500 8 20 1 TC60342 HEAT TRACING
TC60332 TANK HEATER 20 1 9 1500
696 10 20 1 EF70245
EF70246 20 1 11 75
696 12 20 1 SF70243
PNL60323 20 1 13 600
300 14 20 1 LCP70272
DECHLOR AREA LIGHTING 1 20 1 15 295
0 16 20 1
DECHLOR SAMPLE PUMP 1 20 1 17 1200
0 18 20 1
DECHLOR FLOW METER 20 1 19 50
0 20 20 1 SPARE (DECHLOR)
SPARE 20 1 21 0
200 22 20 1 MME60216 (AIT6006)
SPARE (FUTURE CV70264) 20 1 23 0
600 24 20 1 SMP60214
SPACE 25 -- 200 26 20 1 MME60421 (AIT6003)
SPACE 27 --0 28 20 1 SPARE
SPACE 29 --0 30 20 1 SPARE
SPACE 31 --
-- 32 SPACE
SPACE 33 --
-- 34 SPACE
SPACE 35 --
-- 36 SPACE
SPACE 37 --
60 3 SURGE PROTECTION DEVICE
10 38
SPACE 39 -- 10 40
SPACE 41 -- 10 42
10782 VA - 3PH TOTAL CONNECTED 3900 3201 3681
1995 VA - CONTINUOUS X 0.25 (*) = 499 VA
540 VA - GP RECEPTS X (**) = 540 VA
8247 VA - NON-CONTIN X 1.00 = 8247 VA
(* INCLUDES LIGHTING & LARGEST MOTOR) 12199 FEEDER TOTAL (VA) (***) (** 100% OF FIRST 10KW + 50% OF BALANCE) 3 TOTAL RECEPTACLES (*** THREE TIMES LARGEST PHASE + 25% OF CONTINUOUS - 50% OF REC VA OVER 10KVA) 34 LARGEST PHASE CURRENT 3/8/2023 10:37 COMMENT:

PNL70243 SPARE
CV70263 SPARE

CITY OF UKIAH

THICKENING AND DEWATERING
IMPROVEMENTS No. E22550
3-8-23 Page 382 of 1198
75 75-E-100
DEWATERING BUILDING DEMO PLAN 77

DEWATERING BUILDING DEMO PLAN

GENERAL NOTES

KEY NOTES

KEY PLAN

THIS SHEET

CITY OF UKIAH

THICKENING AND DEWATERING
IMPROVEMENTS No. E22550
3-8-23 Page 383 of 1198
75 75-E-101

DEWATERING BUILDING

POWER PLAN
78 DEWATERING BUILDING PLAN

GENERAL NOTES

KEY PLAN

THIS SHEET

CITY OF UKIAH

THICKENING AND DEWATERING
IMPROVEMENTS No. E22550

KEY NOTES
3-8-23 Page 384 of 1198
75-E-102
MCC-D ONE LINE DEMO 79

GENERAL NOTES

KEY NOTES-DEMO

CITY OF UKIAH

THICKENING AND DEWATERING
IMPROVEMENTS No. E22550
3-8-23 Page 385 of 1198
75-E-110
MCC-D ONE LINE DIAGRAM 80

KEY NOTES

GENERAL NOTES

CITY OF UKIAH

THICKENING AND DEWATERING
IMPROVEMENTS No. E22550
3-8-23 Page 386 of 1198
75-E-111
MCC-D ELEVATION-DEMO 81
(E) MCC D - DEMOLITION VIEW

MCC SECTION TABLE
TAG#

GENERAL NOTES

KEY NOTES-DEMO

CITY OF UKIAH

THICKENING AND DEWATERING
IMPROVEMENTS No. E22550
3-8-23 Page 387 of 1198
75-E-112
MCC-D ELEVATION 82
(E) MCC D - ELEVATION VIEW

MCC SECTION TABLE
TAG#

GENERAL NOTES

KEY NOTES
VOLTS/PHASE/WIRE: MAIN
BUS RATING: MAIN BREAKER
(AMPS): AIC RATING (AMPS):

MAIN LUG ONLY:

LOAD SUMMARY MCC-D
FAC/AREA (ZONE/SITE):

EQUIPMENT LOCATION: ELECTRICAL EQUIPMENT ROOM TAG NAME:

FED FROM: DAFT P70281A AND DAFT P70282A
MANUFACTURER: SQUARE D MODEL 6

SECTION
NO. EQUIPMENT NAME KVA HP FLA

BREAKER

TRIP RATING
1D RECLAIMED WATER BOOSTER PUMP 3 4.8
1G THICKENED SLUDGE PUMP 10 14.0
1M POWER MONITOR 0.05 0.1
2B HOT WATER PUMP HWCP-5
2D AIR COMPRESSOR 0.75 1.6
2F BELT CONVEYOR NO.1 1.5 3
2K BELT CONVEYOR NO.2 1.5 3
2M SLUDGE RECIRCULATION PUMP NO.2 10 14
3B BOILER RECIRCULATION PUMP HWCP-2 5 7.6
3D BOILER RECIRCULATION PUMP HWCP-1 5 7.6
3F SLUDGE HEATING WATER PUMP HWCP-3 3 4.8
3H SLUDGE HEATING WATER PUMP HWCP-4 3 4.8
3KL PANELBOARD "B" DISCONNECT 9.9 31.25
3KR ROLL UP DOOR 2 3.4
3ML UNIT HEATER UH-1 3
3MR SCREW PRESS MCP 32 38.5 70A
4BL BOILER NO.1 0.75 1.6
4BR BOILER NO.2 0.75 1.6
SUBTOTAL: 141.7
PLUS 25% OF LARGEST MOTOR: 6.8
TOTAL AMPS 148.5

CITY OF UKIAH

THICKENING AND DEWATERING
IMPROVEMENTS No. E22550
3-8-23 Page 388 of 1198
75-E-113
PANEL SCHEDULES 83

KEY NOTES
VOLTS 120/208V PANEL (E) PNL B MAIN 100A MCB
PHASE 3PH, 4 WIRE LOCATION DEWATERING BUILDING BUS 100A A.I.C. FED FROM MCC-D MOUNTING SURFACE

LOAD VA LOAD LOAD
DESCRIPTION LTG REC MTR AMP P NO. A B C NO. AMP P MTR REC LTG DESCRIPTION

ELEC/SLUDGE HEAT

EXCH/BOILER LTS
1 20 1 1 500
20 1

RCPT-ELEC/SLUDGE HEAT
200 2 EXCH/BOILER
FILTER PRESS LTS 1 20 1 3 300
200 4 20 1 RCPT-FILTER PRESS ROOM
EXTERIOR LIGHTING LTS 1 20 1 5 300
500 6 20 1 SUPPLY FAN SF-1
UNIT HEATER UH-2 20 1 7 800
500 8 20 1 EXHAUST FAN EF-1
UNIT HEATER UH-3 20 1 9 100
500 10 20 1 EXHAUST FAN EF-2
UNIT HEATER UH-4 20 1 11 500
12 20 1 EXHAUST FAN EF-3
20 1 13 0
500 14 20 1 EXHAUST FAN EF-4
FIT-320 20 1 15 600
16 20 1 SPARE
20 1 17 0
800 18 20 1 WATER HEATER EWH-1
SLUDGE CONTROL PNL 20 1 19 200
20 1 SPARE 0 20
SPARE 20 1 21 100
100 22 20 1 <UNKNOWN>
LIT-230 20 1 23
500 24 20 1 FV305/FV306
SPARE 20 1 25 -- 26 30 1 SPARE
SPARE 20 1 27 -- 28 SPACE
STREET LIGHTING 20 1 29 300
30 SPACE
SPACE 31 --
-- 32 SPACE
SPACE 33 --
-- 34 SPACE
SPACE 35 --
-- 36 SPACE
SPACE 37 -- 38 SPACE
SPACE 39 -- 40 SPACE
POLYMER CP (LCP75020) 30 1 41 2040
42 SPACE
9540 VA - 3PH TOTAL CONNECTED 2700 1900 4940
1100 VA - CONTINUOUS X 0.25 (*) = 275 VA
0 VA - GP RECEPTS X (**) = 0 VA
8440 VA - NON-CONTIN X 1.00 = 8440 VA
(* INCLUDES LIGHTING & LARGEST MOTOR) 15095 FEEDER TOTAL (VA) (***) (** 100% OF FIRST 10KW + 50% OF BALANCE) 0 TOTAL RECEPTACLES (*** THREE TIMES LARGEST PHASE + 25% OF CONTINUOUS - 50% OF REC VA OVER 10KVA) 42 LARGEST PHASE CURRENT 3/8/2023 10:17 COMMENT:

SLUDGE COND. POLYMER
FEEDER

BELT PRESS CONTROL-PNL

CITY OF UKIAH

THICKENING AND DEWATERING
IMPROVEMENTS No. E22550
SPARE
SPARE
3-8-23 Page 389 of 1198
CITY OF UKIAH THICKENING AND DEWATERING IMPROVEMENTS No. E22550 00-I-001 P&ID LEGEND AND ABBREVIATIONS 84 MODIFIER OUTPUT FUNCTION READOUT or PASSIVE FUNCTION MODIFIER FIRST LETTER MEASURED or INITIATING VARIABLE INSTRUMENT IDENTIFICATION TAG LETTERS SUCCEEDING LETTER(S) IDBAEDFGHILKJMNPOSRTUQCVWXYZ INDICATORS LOGIC I PRIMARY ELEMENTS MECHANICAL EQUIPMENT ABBREVIATIONS LS### LE### LE### LE###MFE### LINE TYPES REDUCER CONCENTRIC REDUCER ECCENTRIC M PLC I/O REGISTER, WHERE 1 - TAG IDENTIFICATION (SEE ISA INSTRUMENT ID TABLE) 2 - LOOP NUMBER 3 - FUNCTION (SEE ABBREVIATIONS) 4 - DESCRIPTION 5 - LOCATION C BEACON (LETTER DENOTES COLOR) HORN MOTOR HUMAN INTERFACE MODULE (HIM) OR KEYPAD PLC I/O SYMBOLS 3-8-23

Page 390 of 1198 ends

MFE 70-103 M FIT 70-105 LI 70-110 FSL 70-102 FIT 70-102 PSDL 70-102 PI 70-102 FIT 70-103 FIT 70-104 FE 70-104 70-102 SC 70-102 HS 70-102 YI 70-102 UA 70-102 YC 70-103 FI 70-104 FI 70-105 FI 70-103 FQI 70-104 FQI 70-105 FQI 70-110 YC FT 70-110 MFE 70-105 CITY OF UKIAH THICKENING AND DEWATERING IMPROVEMENTS No. E22550 70-I-100 SAF No.1 P&ID 85 3-8-23

Page 391 of 1198 ends

MFE 70-203 M MFE 70-205 FIT 70-205 LI 70-210 FSL 70-202 FIT 70-202 PSDL 70-202 PI 70-202 FIT 70-203 FIT 70-204 FE 70-204 SC 70-202 HS 70-202 YI 70-202 UA 70-202 YC 70-202 FI 70-203 FI 70-204 FI 70-205 FQI 70-203 FQI 70-204 FQI 70-205 YC 70-210 FT 70-210 CITY OF UKIAH THICKENING AND DEWATERING IMPROVEMENTS No. E22550 70-I-101 SAF No.2 P&ID 86 3-8-23

Page 392 of 1198 ends

CITY OF UKIAH THICKENING AND DEWATERING IMPROVEMENTS No. E22550 75-I-001 DEWATERING AREA PLC CABINET MODIFICATIONS 87 NAMEPLATE SCHEDULE TAG FONT SIZE LINE 1 LINE 2 LINE 3 NP-1 ARIAL 1/4"H 1" X 3" INCOMING 120VAC POWER NP-2 ARIAL 1/4"H 1" X 3" 120VAC POWER FED FROM UPS NP-3 ARIAL 1/4"H 1" X 3" 24VDC POWER NP-4 ARIAL 1/4"H 3/4" X 1" ANALOG NP-5 ARIAL 1/4"H 3/4" X 1" DISCRETE OUTPUT NP-6 ARIAL 1/4"H 3/4" X 1" DISCRETE INPUT NP-7 ARIAL 1/4"H 3/4" X 1" DISCRETE INPUT NP-8 ARIAL 1/4"H 3/4" X 1" REDUNDANCY MODULE NP-9 ARIAL 1/4"H 3/4" X 1" PS-1 NP-10 ARIAL 1/4"H 3/4" X 1" PS-2 NP-11 ARIAL 1/4"H 3/4" X 1" PLC NP-12 ARIAL 1/4"H 3/4" X 1" PS-3 NP-13 ARIAL 1/4"H 3/4" X 1" DEWATERING AREA PLC75001 DEMOLITION NOTES KEY NOTES GENERAL NOTES PLC-5 CABINET EXTERIOR ELEVATION PLC-5 CABINET EXTERIOR ELEVATION - DEMO PLC-5 CABINET INTERIOR ELEVATION - DEMO PLC-5 CABINET INTERIOR ELEVATION 3-8-23

Page 393 of 1198 ends

CITY OF UKIAH THICKENING AND DEWATERING IMPROVEMENTS No. E22550 75-I-002 DEWATERING AREA PLC CABINET POWER DISTRIBUTION DIAGRAM 88 PLC 5 POWER DISTRUIBUTION SCHEMATIC DIAGRAM 3-8-23

Page 394 of 1198 ends

LE 75-001 SCREW PRESS FSL LIT 75-030 TSH 75-010 MFE 75-010 FIT 75-010 ZS 75-040 SSL 75-040 SSL 75-050 ZS 75-050 75-010 YI 75-010 UA 75-010 FI 75-001 YI 75-001 UA 75-001 LAHH 75-020 HS 75-020 YI 75-020 UA 75-030 LI 75-030 YI 75-030 UA 75-040 YI 75-040 UA 75-040 HS 75-050 YI 75-050 UA 75-050 HS CITY OF UKIAH THICKENING AND DEWATERING IMPROVEMENTS No. E22550 75-I-100 DEWATERING AREA P&ID 89 3-8-23

Page 395 of 1198 ends

MENDOCINO COUNTY, CALIFORNIA
Special Provisions for:

Thickening and Dewatering Improvements
Specification No. 23-02

CITY OF UKIAH

DEPARTMENT OF PUBLIC WORKS
300 Seminary Avenue
Ukiah, California 95482-5400
Bids Open: Thursday, April 20, 2023
2:00 p.m.

Office of City Clerk
March 2023
2020 Research Park Drive, Suite 100
Davis, CA 95618
(530) 756-5905
FAX (530) 756-5991
ATTACHMENT 3

Page 396 of 1198 ends

(THIS PAGE LEFT BLANK INTENTIONALLY)

Page 397 of 1198 ends

CITY OF UKIAH

MENDOCINO COUNTY, CALIFORNIA
CITY COUNCIL:

MARI RODIN, MAYOR
JOSEFINA DUENAS – VICE-MAYOR
DOUGLAS CRANE – COUNCIL MEMBER
JUAN OROZCO – COUNCIL MEMBER
SUSAN SHER– COUNCIL MEMBER
SAGE SANGIACOMO – CITY MANAGER

TIM ERIKSEN - DIRECTOR OF PUBLIC WORKS / CITY ENGINEER
MARY HORGER – FINANCIAL SERVICES MANAGER
KRISTINE LAWLER – CITY CLERK
R. ALLEN CARTER - CITY TREASURER

CITY OF UKIAH

DEPARTMENT OF PUBLIC WORKS
MARCH 2023

Page 398 of 1198 ends
Page 399 of 1198 ends

THICKENING AND DEWATERING IMPROVEMENTS i Spec No. 23-02

TABLE OF CONTENTS
PAGE
NOTICE TO BIDDERS ................................................................................................................................. 1 INSTRUCTIONS TO BIDDERS.................................................................................................................... 2

GENERAL CONDITIONS
SECTION 1. PROPOSAL REQUIREMENTS AND GENERAL CONDITIONS ........................................... 4 1-01. Definitions
1-02. Examinations of Plans, Special Provisions and Site of Work 1-03. Proposal
1-04. Withdrawal of Bids
1-05. Public Opening of Bids
1-06. Bid Guaranty
1-07. Qualification of Bidders
1-08. Disqualification of Bidders
1-09. Identification of Subcontractors
1-10. General Provisions of the Standard Specifications 1-11. Addenda
SECTION 2. AWARD AND EXECUTION OF CONTRACT ........................................................................ 6 2-01. Award of Contract
2-02. Return of Proposal Guaranties
2-03. Execution of Contract
SECTION 3. SCOPE AND INTENT OF CONTRACT ................................................................................. 6 3-01. Effect of Inspection and Payments
3-02. Effect of Extension of Time
3-03. Extra Work
3-04. Assignment of Contract
3-05. Subcontractors
3-06. Interpretation of Special Provisions and Drawings 3-07. Addenda
3-08. Liability of City Officials
3-09. Dispute Resolution
SECTION 4. BONDS ................................................................................................................................... 8 4-01. Faithful Performance Bond
4-02. Material and Labor Bond
4-03. Defective Material and Workmanship Bond
4-04. Notification of Surety Companies
SECTION 5. INSURANCE REQUIREMENTS FOR CONTRACTORS....................................................... 8 5-01. Minimum Scope of Insurance
5-02. Minimum Limits of Insurance
5-03. Deductibles and Self-Insured Retentions
5-04. Other Insurance Provisions
5-05. Acceptability of Insurers
5-06. Verification of Coverage
5-07. Subcontractors

Page 400 of 1198 ends

THICKENING AND DEWATERING IMPROVEMENTS ii Spec No. 23-02 SECTION 6. RESPONSIBILITIES AND RIGHTS OF CONTRACTOR .................................................... 10 6-01. Legal Address of Contractor
6-02. Office of Contractor at Site
6-03. Attention to Work
6-04. Liability of Contractor
6-05. Protection of Persons and Property
6-06. Protection of City Against Patent Claims
6-07. Protection of Contractor's Work Property
6-08. Regulations and Permits
6-09. Construction Utilities
6-10. Approval of Contractor's Plans
6-11. Suggestions to the Contractor
6-12. Termination of Unsatisfactory Subcontracts
6-13. Preservation of Stakes and Marks
6-14. Assistance to Engineer
6-15. Removal of Condemned Materials and Structures
6-16. Proof of Compliance with Contract
6-17. Errors and Omissions
6-18. Cooperation
6-19. Right of Contractor to Stop Work
6-20. Hiring and Dismissal of Employees
6-21. Wage Rates
6-22. Cleaning Up
6-23. Guaranty
SECTION 7. RESPONSIBILITIES AND RIGHTS OF CITY...................................................................... 15 7-01. Authority of the Engineer
7-02. Inspection
7-03. Surveys
7-04. Rights-of-Way
7-05. Retention of Imperfect Work
7-06. Changes in the Work
7-07. Additional Drawings by City
7-08. Additional and Emergency Protection
7-09. Suspension of Work
7-10. Right of City to Terminate Contract
7-11. Use of Completed Portions
7-12. Right of City to Terminate Contract for Convenience SECTION 8. WORKMANSHIP, MATERIALS AND EQUIPMENT............................................................ 18 8-01. General Quality
8-02. Quality in Absence of Detailed Specifications
8-03. Materials and Equipment Specified by Name
8-04. Source of Materials
8-05. Storage of Materials
8-06. Drawings, Samples and Tests
SECTION 9. PROSECUTION OF WORK ................................................................................................. 19 9-01. Equipment and Methods
9-02. Time of Completion
9-03. Avoidable Delays
9-04. Unavoidable Delays
9-05. Notice of Delays
9-06. Extension of Time
9-07. Unfavorable Weather and Other Conditions

Page 401 of 1198 ends

THICKENING AND DEWATERING IMPROVEMENTS iii Spec No. 23-02 9-08. Saturday, Sunday, Holiday and Night Work
9-09. Hours of Labor
SECTION 10. PAYMENT........................................................................................................................... 21 10-01. Certification by Engineer
10-02. Progress Estimates and Payment
10-03. Substitution of Securities
10-04. Acceptance
10-05. Final Estimate and Payment
10-06. Delay Payments
10-07. Extra Work and Work Omitted
10-08. Compensation for Extra Work or Work Omitted
10-09. Compensation to the City for Extension of Time
10-10. Liquidated Damages for Delay
SECTION 11. MISCELLANEOUS............................................................................................................. 25 11-01. Notice
11-02. Computation of Time
11-03 Claims Procedure
11-04. Litigation and Forum Selection
11-05. Waiver

TECHNICAL SPECIFICATIONS
SECTION 12. GENERAL INFORMATION ................................................................................................ 29 12-01. Location and Scope of Work
12-02. Arrangement of Technical Specifications
12-03. Arrangement of Plans
12-04. Business Licenses
12-05. Permits
12-06. Standard Specifications and Standard Plans
12-07. Temporary Facilities
12-08. Public Convenience and Safety
12-09. Maintaining Traffic
12-10. Stream Pollution
12-11. Warranties
12-12. Utilities
12-13. Preconstruction Conference
12-14. Safety Requirements
SECTION 13. CONSTRUCTION DETAILS............................................................................................... 31 Not Used
SECTION 14. EXCLUSIONS FROM GENERAL CONDITIONS............................................................... 31 14-01. Provisions to be Excluded from General Conditions SECTION 15. AMENDMENTS TO GENERAL CONDITIONS.................................................................. 31 15-01. Provisions of General Conditions to be Amended

Page 402 of 1198 ends

THICKENING AND DEWATERING IMPROVEMENTS iv Spec No. 23-02

CERTIFICATES AND DOCUMENTS
BID SUBMITTAL CHECKLIST ............................................................................................................. 32 PROPOSAL.......................................................................................................................................... 33 BIDDING SCHEDULE .......................................................................................................................... 34 FAIR EMPLOYMENT PRACTICES CERTIFICATION......................................................................... 36 WORKER'S COMPENSATION CERTIFICATE ................................................................................... 37 CERTIFICATE OF NONDISCRIMINATION IN EMPLOYMENT .......................................................... 38 LIST OF PROPOSED SUBCONTRACTORS ...................................................................................... 39 STATEMENT OF EXPERIENCE OF BIDDER..................................................................................... 40 SIGNATURE OF BIDDER .................................................................................................................... 41 BIDDER'S BOND.................................................................................................................................. 42 NON-COLLUSION AFFIDAVIT ............................................................................................................ 43 AGREEMENT....................................................................................................................................... 45 INDEMNIFICATION AGREEMENT...................................................................................................... 49 EXAMPLE BOND FORMS ................................................................................................................... 50 DIRECTIONS FOR PREPARATION OF PERFORMANCE AND MATERIAL AND LABOR BOND.... 55 DEFECTIVE MATERIAL AND WORKMANSHIP (MAINTENANCE) BOND........................................ 56

TECHNICAL SPECIFICATIONS
DIVISION 01 – GENERAL REQUIREMENTS
01110 Summary of Work
01140 Work Sequence and Constraints
01200 Measurement and Payment
01310 Project Meetings
01320 Construction Schedule
01325 Field Engineering
01326 Photographs
01330 Submittals
01450 Testing and Inspections
01500 Construction Facilities and Utilities
01560 Environmental Controls
01570 Storm Water Quality Control
01600 Materials and Equipment
01612 Seismic Design Criteria
01614 Wind Design Requirements
01740 Cleaning
01770 Contract Closeout Procedures
01780 Record Drawings
01782 Operation and Maintenance Information

Page 403 of 1198 ends

THICKENING AND DEWATERING IMPROVEMENTS v Spec No. 23-02 01810 Facility Start-Up and Commissioning
01820 Training
01825 Equipment and System Testing
01890 Restoration of Improvements
01999 Reference Forms
DIVISION 02 – SITEWORK02200 Site Preparation
02221 Demolition, Salvage, and Abandonment
02241 Control of Water
02260 Excavation Support and Protection
02300 Earthwork
02722 Aggregate Base Course Material
02740 Asphalt Paving
DIVISION 03 - CONCRETE
03100 Concrete Formwork
03150 Concrete Joints and Joint Accessories
03200 Concrete Reinforcement
03300 Cast-in-Place Concrete
03366 Tooled Concrete Finishes
03600 Grout
03740 Modifications and Repair to Concrete
DIVISION 05 - METALS
05500 Miscellaneous Metals
DIVISION 09 - FINISHES
09960 High Performance Coatings
09970 Mechanical Zinc Coating
09972 Hot-Dip Zinc Coating
DIVISION 10 - SPECIALTIES
10020 Warning Signs
10520 Fire Extinguishers and Cabinets
DIVISION 11 - EQUIPMENT
11000 General Requirements for Equipment
11002 Equipment Mounting
11241 Emulsion Polymer Feed System
DIVISION 15 - MECHANICAL
15050 Piping Systems
15060 Pipe Hangers and Supports
15076 Piping and Valve Identification Systems
15095 Piping Appurtenances
15097 Seismic Restraints for Piping

Page 404 of 1198 ends

THICKENING AND DEWATERING IMPROVEMENTS vi Spec No. 23-02 15110.5 Valves and Appurtenances
15115.1 Eccentric Plug Valves
15121 Joint Gaskets
15122 Piping Connections
15141 Steel Pipe
15143 Ductile Iron Pipe
15145 Polyvinyl Chloride (PCV) Pressure Pipe (AWWA C900) 15201 Stainless Steel Piping
15250 Pipe Insulation
15996 Testing Pressure Piping
DIVISION 16 - ELECTRICAL
16050 Electrical Work
16070 Hangers and Supports for Electrical Systems
16121 Control (Instrumentation) Cable
16122 600 Volt Cable
16130 Raceways and Boxes for Electrical Systems
16132 Flexible Conduits
16133 Sealing Fittings
16136 Outlet Boxes
16140 Wiring Devices
16180 Overcurrent Protective Devices
16195 Identification for Electrical Systems
16215 Power System Supply
16411 Disconnect Switches
16450 Grounding and Bonding for Electrical Systems
16481 Variable Frequency Drives
16940 Instrumentation
APPENDICES (Under Separate Cover)
APPENDIX A – SAF UNITS
• 10IN Clearmixers Dual Outlet Drawings
• 10IN HDPE Floc Tube Drawings
• 10IN HDPE Floc Tube Mirrored Drawings
APPENDIX B – SCREW PRESS UNIT
APPENDIX C – GEOTECH REPORTS
• Crawford & Associates, Draft Geotechnical Report – City of Ukiah Recycled Water Pipeline – Phase 4 Wastewater Treatment Plant Improvements, November 2022 • Crawford & Associates, Geotechnical Report – City of Ukiah Chlorine Contact Basin Expansion, March 2018

Page 405 of 1198 ends

THICKENING AND DEWATERING IMPROVEMENTS 1 Spec No. 23-02

CITY OF UKIAH, MENDOCINO COUNTY, CALIFORNIA

NOTICE TO BIDDERS
FOR
THICKENING AND DEWATERING IMPROVEMENTS SPECIFICATION NO. 23-02 NOTICE IS HEREBY GIVEN that sealed standard proposals for THICKENING AND DEWATERING IMPROVEMENTS will be received at the Office of the City Clerk, Ukiah Civic Center, 300 Seminary Avenue, Ukiah California until 2:00 p.m. on Thursday, April 20, 2023. Bids shall be addressed to the City Clerk and shall be endorsed THICKENING AND DEWATERING IMPROVEMENTS. Bids are required for the entire work described herein. No fax bids will be accepted. As soon thereafter as possible, the bids will be publicly opened and read in the Council Chambers at 300 Seminary Avenue, Ukiah. The bid opening will also be visible via live streaming at http://www.cityofukiah.com/meetings/.

Plans and Special Provisions may be inspected and/or copies obtained from the City’s website at www.cityofukiah.com/purchasing. No bid will be considered unless it is made on the forms furnished by the City and is made in accordance with the details of the Special Provisions. Each bidder must be licensed as required by law. Further information regarding the work or these specifications can be obtained by calling Seth Strader, Administrative Analyst at (707) 467-5719 or by email at [email protected].

The City Council reserves the right to reject any or all bids and to determine which proposal is, in its opinion, the lowest responsive bid by a responsible bidder and which it deems in the best interest of the City to accept. The City Council also reserves the right, but not the obligation, to waive any irregularity or failure to strictly comply with the bidding requirements, that the City determines in the reasonable exercise of its discretion does not provide the bidder with a competitive advantage over other bidders.

No contractor or subcontractor may be listed on a bid proposal for a public works unless registered with the Department of Industrial Relations (“DIR”) pursuant to Labor Code section 1725.5 except as allowed. under Labor Code section 1771.1(the prime contractor shall be responsible for posting job site notices as prescribed by regulation. This project is subject to compliance monitoring and enforcement by the DIR.

Pursuant to provisions of Section 1770, including amendments thereof, of the Labor Code of the State of California, the DIR Director has ascertained the general prevailing rate of wages for straight time, overtime, Saturdays, Sundays and Holidays including employer payment for health and welfare, vacation, pension and similar purposes for the City of Ukiah. Copies of his General Prevailing Wage Determination are available on the Internet at web address: http://www.dir.ca.gov/DLSR/PWD/ The prime contractor for the work herein shall possess a current, valid State of California, Class A Contractor's License. Pursuant to California Public Contract Code §22300, this contract includes provisions that allow substitutions of certain types of securities in lieu of the City withholding a portion of the partial payments due the Contractor to insure performance under this contract.

By order of the City Council, City of Ukiah, County of Mendocino, State of California.

Dated:________________________ ________________________________________ Kristine Lawler, City Clerk, City of Ukiah, California
PUBLISH TWO TIMES:

Page 406 of 1198 ends

THICKENING AND DEWATERING IMPROVEMENTS 2 Spec No. 23-02

INSTRUCTIONS TO BIDDERS
THICKENING AND DEWATERING IMPROVEMENTS shall be performed in accordance with the Plans and Special Provisions therefor adopted, to which special reference is hereby made.

Each bidder must supply all the information required by the bid documents and Special Provisions.

Minority business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color or national origin in consideration for an award of any contract entered into pursuant to this advertisement. Women will be afforded equal opportunity in all areas of employment. However, the employment of women shall not diminish the standards or requirements for the employment of minorities.

All proposals or bids shall be accompanied by a cashier's check or certified check payable to the order of the City of Ukiah amounting to 10 percent of the bid, or by a bond in said amount and signed by the bidder and a corporate surety, payable to said City. Said check shall be forfeited, or said bond shall become payable to said City in case the bidder depositing the same does not, within fifteen (15) days after written notice that the contract has been awarded to him: (a) enter into a contract with the City and (b) furnish certificates of insurance and endorsements, a bond of faithful performance and a payment bond as described in the Special Provisions.

No bidder shall withdraw his or her bid for a period of thirty (30) calendar days after the date set by the City for the opening thereof.

The Contractor and any subcontractors shall each possess a valid City of Ukiah Business License prior to the start of any work.

The Contractor shall furnish a project schedule to the Engineer prior to the start of any work and start work as scheduled.

The work is to be completed within three hundred and thirty-five (335) calendar days. The Contractor will pay to the City the sum of five hundred ($500.00) dollars per day for each and every calendar day's delay beyond the time prescribed.

The staff shall notify a bidder by telephone or email, if it intends to recommend the rejection of the bidder’s bid. Any bid protest must be filed with the City Clerk not more than five calendar days following the bid opening, or 2 calendar days following notice that staff is recommending the rejection of a bid. If any such timely written protest is filed, all bidders shall be provided a copy of the protest within 2 calendar days of its receipt, which may be delivered to the bidders as an email attachment. All such bidders may file with the City Manager a written objection or other response to the protest.

All objections or responses filed not more than 5 days after receipt of the written protest will be presented to the City Council at its next regular meeting occurring not less than 12 calendar days following the bid opening. The City Council will resolve the bid protest at that meeting based on the written protest, any staff recommendation and all timely written objections and responses. In accordance with the Brown Act, any person may address the City Council on this item during the meeting. The City Council action on the protest shall represent a final decision by the City on the protest.

Examination of Site, Drawings, Etc.

Each bidder shall visit the site of the proposed work and fully acquaint himself with local conditions, construction and labor required so that he or she may fully understand the facilities, difficulties and restrictions attending the execution of the work under the Contract. A mandatory pre-bid meeting will be held at 10:00 am on April 4, 2023 at 300 Plant Road, Ukiah, CA 95482. Bidders shall thoroughly examine and be familiar with the Plans and Special Provisions. The failure of any bidder to receive or examine any

Page 407 of 1198 ends

THICKENING AND DEWATERING IMPROVEMENTS 3 Spec No. 23-02 form, instrument, addendum, or other document, or to visit the site and acquaint himself with conditions there existing, shall in no way relieve the bidder from any obligation with respect to his or her proposal or to the contract. The drawings for the work show conditions as they are supposed or believed by the Engineer to exist; but, it is neither intended nor shall it be inferred that the conditions as shown thereon constitute a representation by the Engineer, the City or its officers that such conditions are actually existent, nor shall the City, the Engineer or any of their officers or representatives be liable for any loss sustained by the Contractor as a result of a variance between the conditions shown on the drawings and the conditions actually revealed during the progress of the work or otherwise.

The bidder's attention is directed to the possible existence of obstructions and public improvements within the limits of the work or adjacent thereto, which may or may not be shown on the Drawings. Any bid shall take into consideration that conditions may exist underground or otherwise that are not known to the City or easily detected during a site inspection that could impact the time or cost of completing the project. The City expects the bids to anticipate such conditions so that it can know for budgeting and other purposes the total cost to complete the project before accepting a bid and undertaking the legal obligation to construct the project. In awarding the contract the City relies on the contractor’s representation that its bid anticipates differing site conditions and the additional time or cost that such conditions may necessitate.

The bidder shall investigate to his or her satisfaction the conditions to be encountered, the character, quality and quantities of work to be performed and materials to be furnished and the requirements of the Plans, Special Provisions, Standard Specifications, Standard Plans, and Contract Documents. The submission of a proposal shall be considered conclusive evidence that the bidder has made such examination and has accepted the project workplace as a safe workplace to perform the work of the Contract.

Bidder Inquiries and Questions
Inquiries and questions must be submitted in writing via email to the following designated contact person:

Seth Strader, Administrative Analyst
Email: [email protected]
The City reserves the right to not respond to inquiries or questions submitted within 3 business days of the bid opening.

Location of the Work
All of the work to be performed is within the City of Ukiah. Project is located at 300 Plant Road, Ukiah, California 95482.

Page 408 of 1198 ends

THICKENING AND DEWATERING IMPROVEMENTS 4 Spec No. 23-02

GENERAL CONDITIONS
SECTION 1. PROPOSAL REQUIREMENTS AND GENERAL CONDITIONS 1-01. Definitions. Whenever any word or expression defined in this section, or pronoun used in its stead, occurs in these contract documents, it shall have and is mutually understood to have the meaning given:
a. "City of Ukiah" or "City" shall mean the City of Ukiah, Mendocino County, California, acting through its City Council or any other board, body, official or officials to which or to whom the power belonging to the Council shall by virtue of any act or acts, hereafter pass or be held to appertain.
b. "Engineer" shall mean the Engineer duly and officially appointed by the City to supervise and direct the work of construction under this contract, acting personally or through agents or assistants duly authorized by him, such agents or assistants acting within the scope of the particular duties entrusted to them.
c. "Inspector" shall mean the engineering or technical inspector or inspectors duly authorized or appointed by the Engineer, limited to the particular duties entrusted to him or her or them.
d. "Contractor" shall mean the party entering into contract with the City of Ukiah for the performance of work covered by this contract and his or her authorized agents or legal representatives.
e. "Date of signing of contract" or words equivalent thereto, shall mean the date upon which this contract, with the signature of the Contractor affixed, together with the prescribed bonds, shall be or shall have been delivered to the City or its duly authorized representatives.
f. "Day" or "days", unless herein otherwise expressly defined, shall mean a calendar day or days of twenty-four hours each.
g. "The work" shall mean and include all the work specified, indicated, shown or contemplated in the contract to construct the improvement, including all alterations, amendments or extensions thereto made by contract change order or other written orders of the Engineer. h. "Contract drawings", "drawings", "plans" shall mean and include 1) all drawings or plans which may have been prepared by or on behalf of the City, as a basis for proposals, when duly signed and made a part of this contract by incorporation or reference, 2) all drawings submitted in pursuance of the terms of this contract by the successful bidder with his or her proposal and by the Contractor to the City if and when approved by the Engineer and 3) all drawings submitted by the Engineer to the Contractor during the progress of the work as provided for herein.
i. Where "as shown", "as indicated", "as detailed" or words of similar import are used, it shall be understood that reference to the drawings accompanying these Special Provisions is made unless stated otherwise.

Where "as directed", "as permitted", "approved" or words of similar import are used, it shall be understood that the direction, requirements, permission, approval or acceptance of the Engineer is intended unless stated otherwise.

As used herein, "provide" or "install" shall be understood to mean "provide or install complete in place", that is, "furnish and install". "Shall" is mandatory; "may" is permissive.

Page 409 of 1198 ends

THICKENING AND DEWATERING IMPROVEMENTS 5 Spec No. 23-02 1-02. Examination of Plans, Special Provisions and Site of Work. The bidder shall examine carefully the Proposal, Plans, Special Provisions, Contract forms and the site of the work contemplated therefor. It will be assumed that the bidder has investigated to his or her satisfaction the conditions to be encountered and the character, quality and requirements of all Plans, Special Provisions, Standard Specifications, and Standard Plans involved.
1-03. Proposal. Bids shall be made on the blank forms prepared by the City. All bids shall give the prices bid, both in writing and in figures and shall be signed by the bidder or his or her authorized representative, with his or her address. If the bid is made by an individual or partner, his or her name and the post office address of his or her business or partnership, along with his or her signature or the signature of one or more partners must be shown; if made by a corporation, the bid shall show the name of the state under the laws of which the corporation is chartered, the name of the corporation and the title of the person who signs on behalf of the corporation.

Each proposal shall be enclosed in a sealed envelope, endorsed as specified in the notice to bidders.

Bidders are warned against making erasures or alterations of any kind and proposals which contain omissions, erasures, conditions, alterations, additions not called for, additional proposals or irregularities of any kind may be rejected.
1-04. Withdrawal of Bids. Any bid may be withdrawn at any time prior to the hour fixed in the notice to bidders for the openings of bids, provided that a request in writing, executed by the bidder or his or her duly authorized representative, for the withdrawal of such bid is filed with the City. The withdrawal of a bid will not prejudice the right of a bidder to file a new bid.
1-05. Public Opening of Bids. Bids will be opened and read publicly at the time and place indicated in the notice to bidders. Bidders or their agents are invited to be present. 1-06. Bid Guaranty. Each bid must be accompanied by a certified check, cashier's check or bidder's bond executed by an admitted surety insurer, payable to the order of the City of Ukiah in an amount not less than 10 percent of the bid as a guarantee that the bidder will enter into a contract, if awarded the work. 1-07. Qualification of Bidders. No contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. No contractor or subcontractor may be awarded a contract for public work on a public works project (awarded on or after April 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. The prime contractor shall be responsible for posting job site notices as prescribed by regulation. This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations.

Each bidder shall be licensed under the provisions of Chapter 9, Division 3 of the Business and Professions Code and shall be skilled and regularly engaged in the general class or type of work called for under this contract. A statement setting forth this experience and business standing shall be submitted by each bidder on the form provided herewith. It is the intention of the City to award a contract only to a bidder who furnishes satisfactory evidence that he or she has the requisite experience and ability and that he or she has sufficient capital, facilities and equipment to enable him or her to prosecute the work successfully and promptly within the time and in the manner agreed.

In determining the degree of responsibility to be credited to a bidder, the City may weigh evidence that the bidder or his or her personnel charged with the responsibility in the work, has performed satisfactorily other contracts of like nature and magnitude or comparable difficulty at similar rates of progress. 1-08. Disqualification of Bidders. More than one bid from an individual business, partnership, corporation or association, under the same or different names, will not be considered. Reasonable grounds for believing that any bidder is financially interested in more than one bid for the work will cause the rejection

Page 410 of 1198 ends

THICKENING AND DEWATERING IMPROVEMENTS 6 Spec No. 23-02 of all bids in which he or she is so interested. If there is reason to believe that collusion exists among the bidders, none of the participants in such collusion will be considered. Bids in which the prices obviously are unbalanced may be rejected.
1-09. Identification of Subcontractors. All bids shall comply with the Subletting and Subcontracting Fair Practices Act (Public Contract Code Section 4100 and following) and shall set forth:
(a) The name and the location of the place of business of each subcontractor who will perform work or labor, or render service to the prime contractor in or about the construction of the work, or to a subcontractor licensed by the State of California who, under subcontract to the prime contractor, specially fabricates and installs a portion of the work according to detailed drawings contained in the plans and Special Provisions, in an amount in excess of one-half of 1 percent of the prime contractor's total bid.
(b) The portion of the work which will be done by each such subcontractor. The prime contractor shall list only one subcontractor for each such portion defined by the prime contractor in his or her bid.
1-10. General Provisions of the Standard Specifications. All provisions of the General Provisions, Sections 1 through 11, of the Standard Specifications, shall be applicable to the contract except as modified by these Special Provisions. The Standard Specifications are set forth in Section 12-06 of these Special Provisions.
1-11. Addenda. If it becomes necessary to revise any part of these plans and specifications after they have been released, the City will issue an addendum containing the revision. All addenda will be posted on the City’s website at www.cityofukiah.com/purchasing with the rest of the bid documents. Anyone who intends to submit a bid in response to this Request for Bid must check the website frequently for any posted addenda. Anyone submitting a bid will be deemed to have seen and agreed to be bound by the posted addenda.

SECTION 2. AWARD AND EXECUTION OF CONTRACT
2-01. Award of Contract. Award of the contract, if it be awarded, will be to the lowest responsible bidder whose bid complies with all the specified requirements. The award, if made, will be made within thirty (30) days after opening of the bids. The City reserves the right to reject any and all bids and to waive any irregularity in the proposal not pertaining to cost.
2-02. Return of Proposal Guaranties. All bid guaranties will be held until the contract has been fully executed, after which they will be returned upon request to the respective bidders whose bids they accompany.
2-03. Execution of Contract. The contract agreement shall be executed in duplicate by the successful bidder and returned, together with the contract bonds, insurance certificates and endorsements, within fifteen (15) days after written notice of the award of the contract. After execution by the City; one copy shall be filed with the City and one copy shall be returned to the Contractor. If the bidder fails or refuses to enter into the contract agreement within the required time, then the bid guaranty accompanying the bid shall be forfeited to the City.

SECTION 3. SCOPE AND INTENT OF CONTRACT
3-01. Effect of Inspection and Payments. Neither the inspection by the Engineer or an inspector, nor any order, measurement or approved modification, nor certificate or payment of money, nor acceptance of any part or whole of the work, nor any extension of time, nor any possession by the City or its agents, shall operate as a waiver of any provision of this contract or of any power reserved therein to the City, or of any

Page 411 of 1198 ends

THICKENING AND DEWATERING IMPROVEMENTS 7 Spec No. 23-02 right to damages thereunder; nor shall any breach of this contract be held to be a waiver of any subsequent breach. All remedies shall be construed as cumulative.
3-02. Effect of Extension of Time. The granting of any extension of time on account of delays which, in the judgement of the City, are avoidable delays shall in no way operate as a waiver on the part of the City of its rights under this contract.
3-03. Extra Work. If extra work orders are given in accordance with provisions of this contract, such work shall be considered a part hereof and shall be subject to each and all of its terms and requirements. 3-04. Assignment of Contract. The contract may be assigned or sublet in whole or in part only upon the written consent of the City acting through its authorized agents. Consent will not be given to any proposed assignment which would relieve the original contractor or its surety of their responsibilities under the contract nor will the Engineer consent to any assignment of a part of the work under the contract. 3-05. Subcontractors. The Contractor shall be as fully responsible for the acts and omissions of his or her subcontractors and of persons either directly or indirectly employed by them, as he or she is for the acts and omissions of persons directly employed by him.

The Contractor shall cause appropriate provisions to be inserted in all subcontracts relative to the work to bind subcontractors to the terms of this Contract which are applicable to the work of subcontractors.

Nothing contained in this contract shall be construed to create or shall be relied upon to create any contractual relationship between any subcontractor and the City and no action may be brought by any subcontractor against the City based on this contract.
3-06. Interpretation of Special Provisions and Drawings. The Special Provisions and the Contract Drawings are intended to be explanatory of each other. Any work indicated in the Contract Drawings and not in the Special Provisions, or vice versa, is to be executed as if indicated in both. In case of a discrepancy or conflict between the Technical Specifications and Contract Plans, the Technical Specifications shall govern. All work shown on the Contract Drawings, the dimensions of which are not figured, shall be accurately followed to the scale to which the drawings are made, but figured dimensions are in all cases to be followed, where given, though they differ from scaled measurements. Large scale drawings shall be followed in preference to small scale drawings. Should it appear that the work to be done, or any of the matters relative thereto, are not sufficiently detailed or explained in these contract documents, including the contract drawings, the Contractor shall apply to the Engineer for such further explanations as may be necessary and shall conform thereto as part of this contract, so far as may be consistent with the terms of this contract. In the event of any doubt or questions arising respecting the true meaning of the Special Provisions, reference shall be made to the Engineer and his or her decision thereon shall be final. If the Contractor believes that a clarification or interpretation justifies an increase in the contract price or contract time, the Contractor must comply with the written notice provisions of Sections 9-05 and 10-07 of these Special Provisions. Contractor’s attention is directed to Section 12-06 of the Technical Specifications regarding the Standard Specifications and Standard Plans. 3-07. Addenda. If it becomes necessary to revise any part of these plans and specifications after they have been released, the City will issue an addendum containing the revision. All addenda will be posted on the City’s website at www.cityofukiah.com/purchasing with the rest of the bid documents. Anyone who intends to submit a bid in response to this Request for Bid must check the website frequently for any posted addenda. Anyone submitting a bid will be deemed to have seen and agreed to be bound by the posted addenda.
3-08. Liability of City Officials. No city official, nor the Engineer, nor any authorized assistant of any of them, shall be personally responsible for any liability arising under this contract.

Page 412 of 1198 ends

THICKENING AND DEWATERING IMPROVEMENTS 8 Spec No. 23-02 3-09. Dispute Resolution. Claims of $375,000 or less by the Contractor that arise under this Contract are subject to the mandatory dispute resolutions provisions in Public Contract Code Sections 20104- 20104.6.

SECTION 4. BONDS
4-01. Faithful Performance Bond. As a part of the execution of this contract, the Contractor shall furnish a bond of a surety company or other securities providing equivalent protection such as cash, letter of credit, or certificates of deposit, acceptable to the City, conditioned upon the faithful performance of all covenants and stipulations under this contract. The amount of the bond shall be 100 percent of the total contract price, as this sum is set forth in the agreement.
4-02. Material and Labor Bond. As a part of the execution of this contract, the Contractor shall furnish a bond of a surety company or other securities providing equivalent protection such as cash, letter of credit or certificates of deposit acceptable to the City in a sum not less than 50 percent of the total contract price, as this sum is set forth in the agreement for the payment in full of all persons, companies or corporations who perform labor upon or furnish materials to be used in the work under this contract, in accordance with the provisions of Sections 3247 through 3252 inclusive of the Civil Code of the State of California and any acts amendatory thereof.
4-03. Defective Material and Workmanship Bond. As a condition precedent to the completion of this contract, the Contractor shall furnish a bond of a surety company acceptable to the City in an amount not less than 5 percent (5%) of the final contract price, to hold good for a period of one (1) year after the completion and acceptance of the work, to protect the City against the results of defective materials, workmanship and equipment during that time. This bond shall be delivered to the City before the final payment under this contract will be made.
4-04. Notification of Surety Companies. The surety companies shall familiarize themselves with all of the conditions and provisions of this contract and they waive the right of special notification of any change or modification of this contract or of extension of time, or decreased or increased work, or of the cancellation of the contract, or of any other act or acts by the City or its authorized agents, under the terms of this contract; and failure to so notify the aforesaid surety companies of changes shall in no way relieve the surety companies of their obligation under this contract.

SECTION 5. INSURANCE REQUIREMENTS FOR CONTRACTORS
(WITH CONSTRUCTION RISKS)
Contractor shall procure and maintain for the duration of the contract insurance against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the work hereunder by the Contractor, his or her agents, representatives, employees or subcontractors. 5-01. Minimum Scope of Insurance
Coverage shall be at least as broad as:

1. Insurance Services Office Commercial Liability Coverage (occurrence form CG 0001).

2. Insurance Services Office form number CA 0001 (Ed. 1/87) covering Automobile Liability, code 1 (any auto).

3. Worker's Compensation insurance as required by the State of California and Employer's Liability Insurance.

4. Course of Construction insurance covering for “all risks” of loss.

Page 413 of 1198 ends

THICKENING AND DEWATERING IMPROVEMENTS 9 Spec No. 23-02 5-02. Minimum Limits of Insurance
Contractor shall maintain limits no less than:

1. General Liability: $1,000,000 per occurrence for bodily injury, personal injury and property damage including operations, products and completed operations. If Commercial General Liability Insurance or other form with a general aggregate limit is used, either the general aggregate limit shall apply separately to this project/location or the general aggregate limit shall be twice the required occurrence limit.

2. Automobile Liability: $1,000,000 per accident for bodily injury and property damage.

3. Employer's Liability: $1,000,000 per accident for bodily injury and property damage.

4. Course of Construction: Completed value of the project with no co-insurance penalty provisions. 5-03. Deductibles and Self-insured Retentions. Any deductibles or self-insured retentions must be declared to and approved by the City. At the option of the City, either: the insurer shall reduce or eliminate such deductibles or self-insured retentions as respects the City, its officers, officials, employees and volunteers; or the Contractor shall provide a financial guarantee satisfactory to the City guaranteeing payment of losses and related investigations, claim administration and defense expenses.
5-04. Other Insurance Provisions
The general liability and automobile liability policies are to contain, or be endorsed to contain, the following provisions:

1. The City, its officers, officials, employees and volunteers are to be covered as Additional Insured with respect to liability arising out of automobiles owned, leased, hired or borrowed by or on behalf of the contractor; and with respect to liability arising out of work or operations performed by or on behalf of the Contractor including materials, parts or equipment furnished in connection with such work or operations. General liability coverage can be provided in the form of an endorsement to the Contractor's insurance, or as a separate owner's policy.

2. The workers’ compensation policy is to be endorsed with a waiver of subrogation. The insurance company, in its endorsement, agrees to waive all rights of subrogation against the City, its officers, officials, employees and volunteers for losses paid under the terms of this policy which arises from the work performed by the named insured for the City.

3. For any claims related to this project, the Contractor's insurance coverage shall be primary insurance as respects the City, its officers, officials, employees or volunteers. Any insurance or self-insurance maintained by the City, its officers, officials, employees or volunteers shall be excess of the Contractor's insurance and shall not contribute with it.

4. Each insurance policy required by this clause shall be endorsed to state that coverage shall not be canceled by either party, except after thirty (30) days' prior written notice by certified mail, return receipt requested, has been given to the City.

5. Coverage shall not extend to any indemnity coverage for the active negligence of the additional insured in any case where an agreement to indemnify the additional insured would be invalid under Subdivision (b) of Section 2782 of Civil Code.

6. Course of Construction policies shall contain the following provisions:
a.) The City shall be named as loss payee.
b.) The insurer shall waive all rights of subrogation against the City.

Page 414 of 1198 ends

THICKENING AND DEWATERING IMPROVEMENTS 10 Spec No. 23-02 5-05. Acceptability of Insurers
Insurance is to be placed with insurers with a current A.M. Best's rating of no less than the following:

A++ VII A- VIII
A+ VII B++ X
A VII B+ X
5-06. Verification of Coverage. Contractor shall furnish the City with original certificates and amendatory endorsements effecting coverage required by this clause. The endorsements shall be on forms provided by the City or on other than the City's forms, provided those endorsements or policies conform to the requirements. All certificates and endorsements are to be received within 15 days from written notice of contract award, and the work shall not commence until the certificates and endorsements have been approved by the City. The City reserves the right to require complete certified copies of all required insurance policies, including endorsements affecting the coverage required by these Special Provisions at any time.
5-07. Subcontractors. Contractor shall include all subcontractors as insureds under its policies or shall furnish separate certificates and endorsements for each subcontractor. All coverages for subcontractors shall be subject to all of the requirements stated herein.

SECTION 6. RESPONSIBILITIES AND RIGHTS OF CONTRACTOR
6-01. Legal Address of Contractor. Both the address given in the proposal and the Contractor's office in the vicinity of the work are hereby designated as places to either of which drawings, samples, notices, letters or other articles or communications to the Contractor may be mailed or delivered. The delivery at either of these places of any such thing from the City or its agents to the Contractor shall be deemed sufficient service thereof upon the Contractor and the date of such service shall be the date of such delivery.

The address named in the proposal may be changed at any time by notice in writing from the Contractor to the City. Nothing herein contained shall be deemed to preclude or render inoperative the service of any drawing, sample, notice, letter or other article or communication to or upon the Contractor personally. 6-02. Office of Contractor at Site. During the performance of this contract, the Contractor shall maintain a suitable office at the site of the work which shall be the headquarters of a representative authorized to receive drawings and any such thing given to the said representatives or delivered at the Contractor's office at the site of work in his or her absence shall be deemed to have been given to the Contractor. 6-03. Attention to Work. The Contractor shall give his or her personal attention to and shall supervise the work to the end that it shall be prosecuted faithfully and when he or she is not personally present on the work, he or she shall at all reasonable times be represented by a competent superintendent or foreman who shall receive and obey all instructions or orders given under this contract and who shall have full authority to execute the same and to supply materials, tools and labor without delay and who shall be the legal representative of the Contractor. The Contractor shall be liable for the faithful observance of any instructions delivered to him or her or to his or her authorized representative. 6-04. Liability of Contractor. The Contractor shall do all of the work and furnish all labor, materials, tools and appliances, except as otherwise herein expressly stipulated, necessary or proper for performing and completing the work herein required in the manner and within the time herein specified. The mention of any specific duty or liability imposed upon the Contractor shall not be construed as a limitation or restriction of any general liability or duty imposed upon the Contractor by this contract, said reference to any specific duty or liability being made herein merely for the purpose of explanation.

The right of general supervision by the City shall not make the Contractor an agent of the City and the liability of the Contractor for all damages to persons or to public or private property, arising from the Contractor's execution of the work, shall not be lessened because of such general supervision.

Page 415 of 1198 ends

THICKENING AND DEWATERING IMPROVEMENTS 11 Spec No. 23-02 Until the completion and final acceptance by the City of all the work under and implied by this contract, the work shall be under the Contractor's responsible care and charge. The Contractor shall rebuild, repair, restore and make good all injuries, damages, re-erections and repairs, occasioned or rendered necessary by causes of any nature whatsoever, excepting only acts of God and none other, to all or any portions of the work, except as otherwise stipulated.

To the fullest extent permitted by law, Contractor shall indemnify and hold harmless the City and its officers, directors, agents and employees from and against all claims, damages, losses and expenses including but not limited to attorneys' fees, costs of suit, expert witness fees and expenses and fees and costs of any necessary private investigators arising out of or resulting from the performance of the work, provided that any such claim, damage, loss or expense (1) is attributable to bodily injury, sickness, disease or death, or to injury to or destruction of tangible property, other than the work itself, including the loss of use resulting therefrom and (2) is caused in whole or in part by any act or omission of the Contractor, any subcontractor, or anyone directly or indirectly employed by any of them, or anyone for whose acts any of them may be liable, regardless of whether or not it is caused in part by a party indemnified hereunder, or by the negligence or omission of a party indemnified herein.

In any and all claims against the City or any of its agents or employees by any employee of the Contractor, any subcontractor, anyone directly or indirectly employed by any of them, or anyone for whose acts any of them may be liable, the indemnification obligation shall not be limited in any way by any limitation on the amount or type of damages, compensation or benefits payable by or for the Contractor or any subcontractor under workers' or workmen's compensation acts, disability benefit acts, or other employee benefit acts. The obligation to indemnify shall extend to and include acts of the indemnified party which may be negligent or omissions which may cause negligence.

The City shall have the right to estimate the amount of such damage and to cause the City to pay the same and the amount so paid for such damage shall be deducted from the money due the Contractor under this contract; or the whole or so much of the money due or to become due the Contractor under this contract as may be considered necessary by the City, shall be retained by the City until such suits or claims for damages shall have been settled or otherwise disposed of and satisfactory evidence to that effect furnished to the City.
6-05. Protection of Persons and Property. The Contractor shall furnish such watchman, guards, fences, warning signs, walks and lights as shall be necessary and shall take all other necessary precautions to prevent damage or injury to persons or property.

All property line fences and improvements in the vicinity of the work shall be protected by the Contractor and, if they are injured or destroyed, they and any other property injured by the Contractor, his or her employees or agents, shall be restored to a condition as good as when he or she entered upon the work. 6-06. Protection of City Against Patent Claims. All fees, royalties or claims for any patented invention, article or method that may be used upon or in any manner connected with the work under this contract shall be included in the price bid for the work and the Contractor and his or her sureties shall protect and hold the City, together with all of its officers, agents, servants and employees, harmless against any and all demands made for such fees or claims brought or made on account of this contract. The Contractor shall, if requested by the Engineer, furnish acceptable proof of a proper release from all such fees or classes.

Should the Contractor, his or her agents, servants or employees, or any of them be enjoined from furnishing or using any invention, article, material or appliance supplied or required to be supplied or used under this contract, the Contractor shall promptly substitute other articles, materials or appliance, in lieu thereof, of equal efficiency, quality, finish, suitability and market value and satisfactory in all respects to the Engineer.

Or, in the event that the Engineer elects, in lieu of such substitution, to have supplied and to retain and use, any such invention, article, material or appliance, as may by this contract be required to be supplied, in that event the Contractor shall pay such royalties and secure such valid licenses as may be requisite and necessary for the City, its officers, agents, servants and employees, or any of them, to use such invention, article, material or appliance without being disturbed or in any way interfered with by any proceeding in law

Page 416 of 1198 ends

THICKENING AND DEWATERING IMPROVEMENTS 12 Spec No. 23-02 or equity on account thereof. Should the Contractor neglect or refuse to make the substitution promptly, or to pay such royalties and secure such licenses as may be necessary, then in that event the Engineer shall have the right to make such substitution, or the City may pay such royalties and secure such licenses and charge the cost thereof against any money due to the Contractor from the City or recover the amount thereof from him or her and his or her sureties notwithstanding final payment under this contract may have been made.
6-07. Protection of Contractor's Work Property. The Contractor shall protect his or her work, supplies and materials from damage due to the nature of the work, the action of the elements, trespassers, or any cause whatsoever under his or her control, until the completion and acceptance of the work. Neither the City nor any of its agents assumes any responsibility for collecting indemnity from any person or persons causing damage to the work of the Contractor.
6-08. Regulations and Permits. The Contractor shall secure and pay for all permits, give all notices and comply with all laws, ordinances, rules and regulations bearing on the conduct of the work as drawn and specified. If the Contractor observes that the Plans and Special Provisions are at variance therewith, he or she shall promptly notify the Engineer in writing and any necessary changes shall be adjusted as provided in the contract for changes in the work. The contractor and any subcontractors shall each secure and maintain a valid City of Ukiah Business License. The City of Ukiah will issue a no fee encroachment permit to the Contractor allowing him or her to perform work within City right of way or within City property after the Contract Documents have been executed and insurance certificates and endorsements have been approved by the City.
6-09. Construction Utilities. The Contractor shall be responsible for providing for and in behalf of his or her work under this contract, all necessary utilities, such as special connection to water supply, telephones, power lines, fences, roads, watchmen, suitable storage places, etc. 6-10. Approval of Contractor's Plans. The approval by the Engineer of any drawing or any method of work proposed by the Contractor in accordance with paragraph 8-06 shall not relieve the Contractor of any of his or her responsibility for his or her errors therein and shall not be regarded as any assumption of risk or liability by the City or any officer or employee thereof and the Contractor shall have no claim under this contract on account of the failure or partial failure or inefficiency of any plan or method so approved. Such approval shall be considered to mean merely that the Engineer has no objection to the Contractor's using, upon his or her own full responsibility the plan or method approved. 6-11. Suggestions to the Contractor. Any plan or method of work suggested by the Engineer to the Contractor, but not specified or required, if adopted or followed by the Contractor in whole or in part, shall be used at the risk and responsibility of the Contractor; and the Engineer and the City shall assume no responsibility thereof.
6-12. Termination of Unsatisfactory Subcontracts. Should any subcontractor fail to perform in a satisfactory manner the work undertaken by him, such subcontract shall be terminated immediately by the Contractor upon notice from the Engineer.
6-13. Preservation of Stakes and Marks. The Contractor shall preserve carefully bench marks, reference points and stakes and in case of destruction he or she shall replace his or her stakes, reference points and bench marks and shall be responsible for any mistakes that may be caused by their unnecessary loss or disturbance. Contractor’s attention is directed to Section 7-03 of these Special Provisions. 6-14. Assistance to Engineer. At the request of the Engineer the Contractor shall provide men from his or her force and tools, stakes and other materials to assist the Engineer temporarily in making measurements and surveys and in establishing temporary or permanent reference marks. Payment for such materials and assistance will be made as provided for under the caption "Extra Work," provided, however, that the cost of setting stakes and marks carelessly lost or destroyed by the Contractor's employees will be assessed to the Contractor.

Page 417 of 1198 ends

THICKENING AND DEWATERING IMPROVEMENTS 13 Spec No. 23-02 6-15. Removal of Condemned Materials and Structures. The Contractor shall remove from the site of the work, without delay, all rejected and condemned materials or structures of any kind brought to or incorporated in the work and upon his or her failure to do so, or to make satisfactory progress in so doing, within forty-eight (48) hours after the service of a written notice from the Engineer, the condemned material or work may be removed by the City and the cost of such removal shall be taken out of the money that may be due or may become due the Contractor on account of or by virtue of this contract. No such rejected or condemned material shall again be offered for use by the Contractor under this Contract. 6-16. Proof of Compliance with Contract. In order that the Engineer may determine whether the Contractor has complied with the requirements of this contract, not readily enforceable through inspection and tests of the work and materials, the Contractor shall, at any time when requested, submit to the Engineer properly authenticated documents or other satisfactory proofs as to his or her compliance with such requirements.
6-17. Errors and Omissions. If the Contractor, in the course of the work, finds any errors or omissions in plans or in the layout as given by survey points and instruction, or if he or she finds any discrepancy between the plans and the physical conditions of the locality, he or she shall immediately inform the Engineer, in writing and the Engineer shall promptly verify the same. Any work done after such discovery, until authorized, will be done at the Contractor's risk.
6-18. Cooperation. The Contractor shall cooperate with all other contractors who may be performing work in behalf of the City and workmen who may be employed by the City on any work in the vicinity of the work to be done under this contract with the work of such contractors or workmen. he or she shall make good promptly, at his or her own expense, any injury or damage that may be sustained by other contractors or employees of the City at his or her hands.

Any difference or conflict which may arise between the Contractor and other contractors, or between the contractor and workmen of the City in regard to their work shall be adjusted and determined by the Engineer.

If the work of the Contractor is delayed because of any acts or omissions of any other contractor or of the City, the Contractor shall on that account have no claim against the City other than for an extension of time. 6-19. Right of Contractor to Stop Work. Under the following conditions the Contractor shall have the right, if he or she so desires, to stop the work and terminate the contract upon ten (10) days written notice to the Engineer and recover from the City payment for all work actually performed and for all satisfactory materials actually delivered to the site of the work for permanent incorporation therein, all as may be shown by the estimate of the Engineer.
(1) If the work is stopped under an order of any court or other competent public authority for a period of time of three (3) months through no act or fault of the Contractor or of anyone employed by him.
(2) If the Engineer fails to issue the monthly certificate for payment in accordance with the terms of this contract.
(3) If the City fails to pay the Contractor within sixty (60) days after it shall have become due, as provided by the terms of this contract, any sum certified by the Engineer or awarded by the City.

All provided that if such action to terminate the contract be not instituted by the Contractor within ten (10) days after the alleged existence of such condition and if written notice of such action be not at that time delivered to the City and the Engineer, then such right shall lapse until another occasion arises according to this section.
6-20. Hiring and Dismissal of Employees. The Contractor shall employ only such foremen, mechanics and laborers as are competent and skilled in their respective lines of work and whenever the Engineer shall notify the Contractor that any person on the work is, in his or her opinion, incompetent, unfaithful, intemperate or disorderly, or refuses to carry out the provisions of this contract, or uses threatening or abusive language to any person on the work representing the City, or is otherwise unsatisfactory, such

Page 418 of 1198 ends

THICKENING AND DEWATERING IMPROVEMENTS 14 Spec No. 23-02 person shall be discharged immediately from the work and shall not be re-employed upon it except with the consent of the Engineer.
6-21. Wage Rates.

1. Contractor shall pay all mechanics and laborers employed or working upon the site of the work unconditionally and without subsequent deductions or rebate on any account the full amounts due at the time of payment at wage rates not less than those contained in the applicable prevailing wage determination, regardless of any contractual relationship which may be alleged to exist between the Contractor and subcontractors and such laborers and mechanics.

2. Contractor shall comply with the California Labor Code Section 1775. In accordance with said Section 1775, Contractor shall forfeit as a penalty to the Owner, $50.00 (or the higher minimum penalty as provided in Section 1775(B)(ii) – (iii)) for each calendar day or portion thereof, for each workman paid less than the stipulated prevailing rates for such work or craft in which such workman is employed for any work done under the Contract by him or her or by any subcontractor under him or her in violation of the provisions of the Labor Code and in particular, Labor Code Sections 1770 to 1780, inclusive. In addition to said penalty and pursuant to Section 1775, the difference between such stipulated prevailing wage rates and the amount paid to each workman for each calendar day or portion thereof for which each workman was paid less than the stipulated prevailing wage rate shall be paid to each workman by the Contractor.

3. Pursuant to the provision of Section 1770 of the Labor Code of the State of California, Owner has ascertained the general prevailing rate of wages (which rate includes employer payments for health and welfare, vacation, pension and similar purposes) applicable to the work to be done, for straight time work. The holiday wage rate listed shall be applicable to all holidays recognized in the collective bargaining agreement of the particular craft, classification or type of workmen concerned.

Copies of the General Prevailing Wage Determination are available on the Internet at web address:
http://www.dir.ca.gov/DLSR/PWD The Contractor shall post the wage determination at the site of work in a prominent place where it can easily be seen by the workers.

4. City will not recognize any claim for additional compensation because the Contractor has paid any rate in excess of the prevailing wage rate obtained by the Contractor. The possibility of wage increases is one of the elements to be considered by the Contractor in determining his or her bid and will not in any circumstances be considered as the basis for a claim against the City.

5. The Labor Commissioner through the Division of Labor Standards Enforcement (DLSE) may at any time require contractors and subcontractors to furnish electronic certified payroll records directly to DLSE. Commencing with contracts awarded or after April 1, 2015, all contractors and subcontractors must furnish electronic certified payroll records directly to the DLSE.

6. Travel and Subsistence Payments.

Contractor shall make travel and subsistence payments to each workman needed to execute the work in accordance with the requirements in Section 1773.8 of the Labor Code (Chapter 880, Statutes of 1968).

7. Apprentices.

Attention is directed to the provisions in Sections 1777.5 (Chapter 1411, Statutes of 1968) and 1777.6 of the California Labor Code concerning the employment of apprentices by the Contractor or any subcontractor under him. Contractor and any subcontractor under him or her shall comply with the requirements of said sections in the employment of apprentices.

Information relative to apprenticeship standards, wage schedules and other requirements may be obtained from the Director of Industrial Relations, ex officio the Administrator of Apprenticeship, San Francisco, California, or from the Division of Apprenticeship Standards and its branch offices.

Page 419 of 1198 ends

THICKENING AND DEWATERING IMPROVEMENTS 15 Spec No. 23-02 6-22. Cleaning Up. The Contractor shall not allow the site of the work to become littered with trash and waste material, but shall maintain the same in a neat and orderly condition throughout the construction period. The Engineer shall have the right to determine what is or is not waste material or rubbish and the place and manner of disposal.

On or before the completion of the work, the Contractor shall without charge therefore carefully clean out all pits, pipes, chambers or conduits and shall tear down and remove all temporary structures built by him or her and shall remove rubbish of all kind from any of the grounds which he or she has occupied and leave them in first class condition.
6-23. Guaranty. All work shall be guarantied for a period of one year from the date of acceptance by the City. The Contractor shall promptly make all needed repairs arising out of defective materials, workmanship and equipment.

The City is hereby authorized to make such repairs if within ten days after the mailing of a notice in writing to the Contractor or his or her agent, the Contractor shall neglect to make or undertake with due diligence the aforesaid repairs, provided, however, that in case of an emergency where, in the opinion of the City delay would cause serious loss or damage, repairs may be made without notice being sent to the Contractor and the Contractor shall pay the costs thereof.

Pursuant to the provisions of Section 4-03 of these Special Provisions, the Contractor shall furnish a Defective Material and Workmanship Bond in an amount not less than 5 percent of the final contract price, which shall be effective for a period of one (1) year after the completion and acceptance of the work.

SECTION 7. RESPONSIBILITIES AND RIGHTS OF CITY
7-01. Authority of the Engineer. All work done under this contract shall be done in a workmanlike manner and shall be performed to the reasonable satisfaction of the Engineer, who shall have general supervision of all work included hereunder. To prevent disputes and litigation, the Engineer (1) shall in all cases determine the amount, quality, acceptability and fitness of the several kinds of work and materials which are to be paid for under this contract, (2) shall decide all questions relative to the true construction, meaning and intent of the Special Provisions and Drawings, (3) shall decide all questions which may arise relative to the classifications and measurements of quantities and materials and the fulfillment of this contract and (4) shall have the power to reject or condemn all work or material which does not conform to the terms of this contract. his or her estimate and decision in all matters shall be a condition precedent to an appeal for arbitration, or the right of the Contractor to receive, demand, or claim any money or other compensation under this agreement and a condition precedent to any liability on the part of the City to the Contractor on account of this contract. Whenever the Engineer shall be unable to act, in consequence of absence or other cause, then such engineer as the Engineer or the City shall designate, shall perform any and all of the duties and be vested with any or all of the powers herein given to the Engineer. 7-02. Inspection. The City will provide engineering personnel for the inspection of the work.

The Engineer and his or her representatives shall at all times have access to the work whenever it is in preparation or progress and the Contractor shall provide proper facilities for such access and inspection.

If the Special Provisions, the Engineer's instruction, laws, ordinances, or any public authority require any work to be specially tested or approved, the Contractor shall give the Engineer timely notice of its readiness for inspection and, if the inspection is by an authority other than the Engineer, of the date fixed for such inspection. Inspections by the Engineer shall be promptly made at the source of supply where practicable.

If any work shall be covered up without approval or consent of the Engineer, it must, if required by the Engineer, be uncovered for examination and properly restored at the Contractor's expense.

Re-examination of any work may be ordered by the Engineer and, if so ordered, the work must be uncovered by the Contractor. If such work is found to be in accordance with the contract documents, the

Page 420 of 1198 ends

THICKENING AND DEWATERING IMPROVEMENTS 16 Spec No. 23-02 City shall pay the cost of re-examination and replacement. If such work is not in accordance with the contract documents, the Contractor shall pay such cost.

Properly authorized and accredited inspectors shall be considered to be the representatives of the City limited to the duties and powers entrusted to them. It will be their duty to inspect materials and workmanship of those portions of the work to which they are assigned, either individually or collectively, under instructions of the Engineer and to report any and all deviations from the Drawings, Special Provisions and other contract provisions which may come to their notice. Any inspector may be considered to have the right to order the work entrusted to his or her supervision stopped, if in his or her opinion such action becomes necessary, until the Engineer is notified and has determined and ordered that the work may proceed in due fulfillment of all contract requirements.
7-03. Surveys. Contractor shall furnish all land surveys, establish all base lines and bench marks and make sufficient detailed surveys needed for working points, lines and elevations. The Contractor shall develop all slope stakes and batter boards. Contractor shall also develop all additional working points, lines and elevations as he or she may desire to facilitate his or her methods and sequence of construction. 7-04. Rights-of-Way. The City will provide all necessary rights-of-way and easements in or beneath which work will be performed by the Contractor under this contract. 7-05. Retention of Imperfect Work. If any portion of the work done or material furnished under this contract shall prove defective and not in accordance with the Plans and Special Provisions, and if the imperfection in the same shall not be of sufficient magnitude or importance to make the work dangerous or undesirable, the Engineer shall have the right and authority to retain such work instead of requiring the imperfect work to be removed and reconstructed, but he or she shall make such deductions therefor in the payments due or to become due the Contractor as may be just and reasonable. 7-06. Changes in the Work. The Engineer shall have the right, in writing, to order additions to, omissions from, or corrections, alterations and modifications in the line, grade, form, dimensions, plan, or kind or amount of work or materials herein contemplated, or any part thereof, either before or after the beginning of construction. However, the arithmetical sum of the cost to the City of additions and subtractions from the work under this contract shall not exceed 10 percent of original contract amount or $5,000, whichever is the greater, unless based upon a supplementary agreement to be made therefore.

The order of such additions, omissions, corrections, alterations and modifications shall be in writing and signed by the Engineer and, in order, shall then be binding upon the Contractor. The Contractor shall proceed with the work as changed and the value of such change shall be determined as provided for in section 10-07 of these Special Provisions.

Such alterations shall in no way affect, vitiate, or make void this contract or any part thereof, except that which is necessarily affected by such alterations and is clearly the evident intention of the parties to this contract.
7-07. Additional Drawings by City. The drawings made a part of this contract at the time of its execution are intended to be fairly comprehensive and to indicate in more or less detail the scope of the work. In addition to these drawings, however, the Engineer shall furnish such additional drawings from time to time during the progress of the work as are necessary to make clear or to define in greater detail the intent of the Special Provisions and the contract drawings and the Contractor shall make his or her work conform to all such drawings.
7-08. Additional and Emergency Protection. Whenever, in the opinion of the Engineer, the Contractor has not taken sufficient precautions for the safety of the public or the protection of the works to be constructed under this contract, or of adjacent structures or property which may be injured by the processes of construction on account of such neglect and whenever, in the opinion of the Engineer, an emergency shall arise and immediate action shall be considered necessary in order to protect public or private, personal

Page 421 of 1198 ends

THICKENING AND DEWATERING IMPROVEMENTS 17 Spec No. 23-02 or property interest, then and in that event, the Engineer, with or without notice to the Contractor may provide suitable protection to the said interests by causing such work to be done and such material to be furnished as shall provide such protection as the Engineer may consider necessary and adequate.

The cost and expense of such work and material so furnished shall be borne by the Contractor and, if the same shall not be paid on presentation of the bills therefor, then such costs shall be deducted from any amounts due or to become due the Contractor.

The performance of such emergency work under the direction of the Engineer shall in no way relieve the Contractor from any damages which may occur during or after such precaution has been taken by the Engineer.
7-09. Suspension of Work. The City may at any time suspend the work or any part thereof by giving five (5) days written notice to the Contractor. The work shall be resumed by the Contractor within ten (10) days after the date fixed in the written notice from the City to the Contractor so to do. The City shall reimburse the Contractor for expense incurred by the Contractor in connection with the work under this contract as a result of such suspension.

If the work, or any part thereof, shall be stopped by the notice in writing aforesaid and if the City does not give notice in writing to the Contractor to resume work at a date within ten (10) days of the date fixed in the written notice to suspend, then the Contractor may abandon that portion of the work so suspended and he or she will be entitled to the estimates and payments for all work done on the portions so abandoned, if any, plus 5 percent of the value of the work so abandoned, to compensate for loss of overhead, plant expense and anticipated profit.
7-10. Right of City to Terminate Contract. If the Contractor should be adjudged a bankrupt, or if he or she should make a general assignment for the benefit of his or her creditors, or if a receiver should be appointed on account of his or her insolvency, or if he or she should persistently or repeatedly refuse or should fail, except in cases for which extension of time is provided, to supply sufficient properly skilled workmen or proper materials, or if he or she should fail to make prompt payments to subcontractors or for material or labor, or persistently disregard laws, ordinances or the instructions of the Engineer, or otherwise be guilty of a substantial violation of any provision of the contract, then the City, upon the certificate of the Engineer that sufficient cause exists to justify such action, may, without prejudice to any other right or remedy and after giving the Contractor seven days written notice, terminate the employment of the Contractor and take possession of the premises and of all materials, tools and appliances and finish the work by whatever method the City may deem expedient. In such case, the Contractor shall not be entitled to receive any further payment until the work is finished. If the unpaid balance of the contract price shall exceed the expense of finishing the work, including compensation for additional managerial and administrative services, such excess shall be paid to the Contractor. If such expense shall exceed such unpaid balance, the Contractor shall pay the difference to the City. The expense incurred by the City as herein provided and the damage incurred through the Contractor's default, shall be certified by the Engineer. In the event that a termination under this section is determined to be improper, such termination shall be deemed a constructive termination for convenience taken pursuant to section 7-12 below. 7-11. Use of Completed Portions. The City shall have the right to take possession of and use any completed or partially completed portions of the work, notwithstanding the time for completing the entire work or such portions which may not have expired; but such taking possession and using shall not be deemed an acceptance of any work not completed in accordance with the contract documents. If such prior use increases the cost of or delays the work, the Contractor shall be entitled to such extra compensation, or extension of time or both, as the Engineer may determine. 7-12. Right of City to Terminate Contract for Convenience. The City may terminate performance of the work called for by the contract documents in whole or, from time to time, in part, if the City determines that a termination is in the City’s best interest. The Contractor shall terminate all or any part of the work upon delivery to the Contractor of a notice of termination specifying that the termination is for the convenience of the City, the extent of termination, and the effective date of such termination. After receipt

Page 422 of 1198 ends

THICKENING AND DEWATERING IMPROVEMENTS 18 Spec No. 23-02 of notice of termination, and except as directed by the Engineer, the Contractor shall, regardless of any delay in determining or adjusting any amounts due under this termination for convenience clause, immediately proceed with the following obligations:

Stop work as specified in the notice.

Complete any work specified in the notice of termination in a least cost/shortest time manner while still maintaining the quality called for under the contract documents.

Leave the property upon which the Contractor was working and upon which the facility (or facilities) forming the basis of the contract documents is situated in a safe and sanitary manner such that it does not pose any threat to the public health or safety.

Terminate all subcontracts to the extent that they relate to the portions of the work terminated.

Place no further subcontracts or orders, except as necessary to complete the continued portion of the contract.

Submit to the Engineer, within ten (10) calendar days from the effective date of the notice of termination, all of the usual documentation called for by the contract documents to substantiate all costs incurred by the Contractor for labor, materials and equipment through the effective date of the notice of termination. Any documentation substantiating costs incurred by the Contractor solely as a result of the City's exercise of its right to terminate this Contract pursuant to this clause, which costs the contractor is authorized under the contract documents to incur, shall: (1) be submitted to and received by the Engineer no later than 30 calendar days after the effective date of the notice of termination; (2) describe the costs incurred with particularity; and (3) be conspicuously identified as “Termination Costs occasioned by the City's Termination for Convenience.”
Termination of the contract shall not relieve Surety of its obligation for any just claims arising out of or relating to the work performed. In the event that the City exercises its right to terminate this contract pursuant to this clause, the City shall pay the Contractor, upon the Contractor's submission of the documentation required by this clause and other applicable provisions of the contract documents, the following amounts:

All actual reimbursable costs incurred according to the provisions of this contract.

A reasonable allowance for profit on the cost of the Work performed, provided Contractor establishes to the satisfaction of the Engineer that it is reasonably probable that Contractor would have made a profit had the contract been completed and provided further, that the profit allowed shall in no event exceed fifteen (15%) percent of the costs.

A reasonable allowance for Contractor's administrative costs in determining the amount payable due to termination of the contract under this Article.

Notwithstanding any other provision of this Article, when immediate action is necessary to protect life and safety or to reduce significant exposure or liability, the City may immediately order Contractor to cease work on the project until such safety or liability issues are addressed to the satisfaction of the City or the contract is terminated.

SECTION 8. WORKMANSHIP, MATERIALS and EQUIPMENT
8-01. General Quality. Materials and equipment shall be new and of a quality equal to that specified or approved. Work shall be done and completed in a thorough and workmanlike manner.

Page 423 of 1198 ends

THICKENING AND DEWATERING IMPROVEMENTS 19 Spec No. 23-02 8-02. Quality in Absence of Detailed Specifications. Whenever under this contract it is provided that the Contractor shall furnish materials or manufactured articles or shall do work for which no detailed specifications are set forth, the materials or manufactured articles shall be of the best grade in quality and workmanship obtainable in the market from firms of established good reputation, or, if not ordinarily carried in stock, shall conform to the usual standards for first-class materials or articles of the kind required, with due consideration of the use to which they are to be put. In general, the work performed shall be in full conformity and harmony with the intent to secure the best standard of construction and equipment of the work as a whole or in part.
8-03. Materials and Equipment Specified by Name. Whenever any material or equipment is indicated or specified by patent or proprietary name or by the name of the manufacturer, such specification shall be considered as used for the purpose of describing the material or equipment desired and shall be considered as followed by the words "or approved equal". The Contractor may offer any material or equipment which shall be equal in every respect to that specified, provided that written approval first is obtained from the Engineer.
8-04. Source of Materials. Price, fitness and quality being equal, preference shall be given by the Contractor for supplies grown, manufactured or produced in the State of California and, next, for such products partially produced in this State in accordance with Government Code Section 4332. 8-05. Storage of Materials. Materials shall be so stored to ensure the preservation of their quality and fitness for the work. They shall be so located and disposed that prompt and proper inspection thereof may be made.
8-06. Drawings, Samples and Tests. As soon as possible after execution of the contract, the Contractor shall submit to the Engineer, in quintuplicate, sufficient information including, if necessary, assembly and detail drawings to demonstrate fully that the equipment and materials to be furnished comply with the provisions and intent of these Special Provisions and Drawings. If the information thus submitted indicates the equipment or materials is acceptable, the Engineer will return one copy stamped with his or her approval; otherwise, one copy will be returned with an explanation of why the equipment or material is unsatisfactory. The Contractor shall have no claims for damages or for extension of time on account of any delay due to the revision of drawings or rejection of material. Fabrication or other work performed in advance of approval shall be done entirely at the Contractor's risk. After approval of equipment or material, the Contractor shall not deviate in any way from the design and specifications given without the written consent of the Engineer.

When requested by the Engineer, a sample or test specimens of the materials to be used or offered for use in connection with the work shall be prepared at the expense of the Contractor and furnished by him or her in such quantities and sizes as may be required for proper examination and tests, with all freight charges prepaid and with information as to their sources.

All samples shall be submitted before shipment and in ample time to permit the making of proper tests, analyses, or examination before the time at which it is desired to incorporate the material into the work. All tests of materials furnished by the Contractor shall be made by the Engineer. Samples shall be secured and tested whenever necessary to determine the quality of the material.

SECTION 9. PROSECUTION OF WORK
9-01. Equipment and Methods. The work under this contract shall be prosecuted with all materials, tools, machinery, apparatus and labor and by such methods as are necessary to the complete execution of everything described, shown, or reasonably implied. If at any time before the beginning or during the progress of the work, any part of the Contractor's plant or equipment, or any of his or her methods of execution of the work, appear to the Engineer to be unsafe, inefficient, or inadequate to insure the required quality or the rate of progress of the work, he or she may order the Contractor to increase or improve his or her facilities or methods and the Contractor shall comply promptly with such orders; but, neither compliance

Page 424 of 1198 ends

THICKENING AND DEWATERING IMPROVEMENTS 20 Spec No. 23-02 with such orders nor failure of the Engineer to issue such orders shall relieve the Contractor from his or her obligation to secure the degree of safety, the quality of the work and the rate of progress required of the Contractor. The Contractor alone shall be responsible for the safety, adequacy and efficiency of his or her plant, equipment and methods.
9-02. Time of Completion. The Contractor shall promptly begin the work under this contract and shall complete and make ready for full use all portions of the project made the subject of this contract within the time set forth in the agreement bound herewith.
9-03. Avoidable Delays. Avoidable delays in the prosecution or completion of the work shall include all delays which might have been avoided by the exercise of care, prudence, foresight and diligence on the part of the Contractor. The City will consider as avoidable delays within the meaning of this contract (1) delays in the prosecution of parts of the work, which may in themselves be unavoidable, but do not necessarily prevent or delay the prosecution of other parts of the work nor the completion of the whole work within the time herein specified, (2) reasonable loss of time resulting from the necessity of submitting plans to the Engineer for approval and from the making of surveys, measurements, inspections, and testing and (3) such interruptions as may occur in the prosecution of the work on account of the reasonable interference of other contractors employed by the City which do not necessarily prevent the completion of the whole work within the time herein specified.
9-04. Unavoidable Delays. Unavoidable delays in the prosecution or completion of the work under this contract shall include all delays which may result, through cause beyond the control of the Contractor and which he or she could not have provided against by the exercise of care, prudence, foresight and diligence.

Orders issued by the City changing the amount of work to be done, the quantity of material to be furnished or the manner in which the work is to be prosecuted and unforeseen delays in the completion of the work of other contractors under contract with the City will be considered unavoidable delays, so far as they necessarily interfere with the Contractor's completion of the whole of the work. Delays due to normally adverse weather conditions will not be regarded as unavoidable delays. However, truly abnormal amounts of rainfall, temperatures or other weather conditions for the location of the work and time of year may be considered as unavoidable delays if those conditions necessarily cause a delay in the completion of the work.
9-05. Notice of Delays. Whenever the Contractor foresees any delay in the prosecution of the work and, in any event, immediately upon the occurrence of any delay which the contractor regards as an unavoidable delay, he or she shall notify the Engineer in writing of the probability of the occurrence of such delay and its cause, in order that the Engineer may take immediate steps to prevent, if possible, the occurrence or continuance of the delay, or, if this cannot be done, may determine whether the delay is to be considered avoidable or unavoidable, how long it continues and to what extent the prosecution and completion of the work are to be delayed thereby.
9-06. Extension of Time. Should any delays occur which the Engineer may consider unavoidable, as herein defined, the Contractor shall, pursuant to his or her application, be allowed an extension of time proportional to said delay or delays, beyond the time herein set forth, in which to complete this contract; and liquidated damages for delay shall not be charged against the Contractor by the City during an extension of time granted because of unavoidable delay or delays.

Any claim by Contractor for a time extension based on unavoidable delays shall be based on written notice delivered to the Engineer within 15 days of the occurrence of the event giving rise to the claim. Failure to file said written notice within the time specified shall constitute a waiver of said claim. Notice of the full extent of the claim and all supporting data must be delivered to the Engineer within 45 days of the occurrence unless the Engineer specifies in writing a longer period. All claims for a time extension must be approved by the Engineer and incorporated into a written change order. 9-07. Unfavorable Weather and Other Conditions. During unfavorable weather and other conditions, the Contractor shall pursue only such portions of the work as shall not be damaged thereby. No portions of the work whose satisfactory quality or efficiency will be affected by any unfavorable conditions shall be

Page 425 of 1198 ends

THICKENING AND DEWATERING IMPROVEMENTS 21 Spec No. 23-02 constructed while these conditions remain, unless, by special means or precautions approved by the Engineer, the Contractor shall be able to overcome them.

The Contractor shall be granted a time extension of one day for each unfavorable weather day which prevents him or her from placing concrete forms or placing and finishing concrete or asphalt concrete. Such unfavorable weather day is defined as a rain day where precipitation prevents the contractor from performing the work more than four (4) continuous hours within the authorized work period or a temperature day where the ambient temperature is below that specified for the placement of materials associated with the controlling work item for more than four (4) continuous work hours of the authorized work period. 9-08. Saturday, Sunday, Holiday and Night Work. No work shall be done between the hours of 6 p.m. and 7 a.m., nor on Saturdays, Sundays or legal holidays except such work as is necessary for the proper care and protection of work already performed, or except in cases of absolute necessity and in any case only with the permission of the Engineer.

It is understood, however, that night work may be established as a regular procedure by the Contractor if he or she first obtains the written permission of the Engineer and that such permission may be revoked at any time by the Engineer if the Contractor fails to maintain at night adequate force and equipment for reasonable prosecution and to justify inspection of the work. 9-09. Hours of Labor. Eight (8) hours of labor shall constitute a legal day's work and the Contractor or any subcontractor shall not require or permit more than eight hours of labor in a day from any person employed by him or her in the performance of the work under this contract, unless paying compensation for all hours worked in excess of eight (8) hours per day at not less than 1½ times the basic rate of pay.

The Contractor shall forfeit to the City, as a penalty, the sum of twenty-five dollars ($25.00) for each workman employed in the execution of the contract by him or her or by any subcontractor, for each calendar day during which such laborer, workman, or mechanic is required or permitted to labor more than eight hours in violation of the provisions of Section 1810 to 1816, inclusive, (Article 3, Chapter 1, Part 7, Division 2) of the Labor Code of the State of California and any acts amendatory thereof.

SECTION 10. PAYMENT
10-01. Certification by Engineer. All payments under this contract shall be made upon the presentation of certificates in writing from the Engineer and shall show that the work covered by the payments has been done and the payments thereof are due in accordance with this contract. 10-02. Progress Estimates and Payment. The Engineer shall, within the first seven (7) days of each month, make an estimate of the value of the work performed in accordance with this contract during the previous calendar month.

The first estimate shall be of the value of the work satisfactorily completed in place and meeting the requirements of the contract. And every subsequent estimate, except the final estimate, shall be of the value of the work satisfactorily completed in place since the last preceding estimate was made; provided, however, that should the Contractor fail to adhere to the program of completion fixed in this contract, the Engineer shall deduct from the next and all subsequent estimates the full calculated accruing amount of the liquidated damages to the date of said estimate, until such time as the compliance with the program has been restored.

The estimate shall be signed by the Engineer and, after approval, the City shall pay or cause to be paid to the Contractor in the manner provided by law, an amount equal to 95 percent of the estimated value of the work satisfactorily performed and complete in place.
10-03. Substitution of Securities.

1. At such times that Public Contract Code Section 22300 is in effect Contractor may propose the substitution of securities of at least equal market value for any moneys to be withheld to ensure performance

Page 426 of 1198 ends

THICKENING AND DEWATERING IMPROVEMENTS 22 Spec No. 23-02 under the Contract. Market value shall be determined as of the day prior to the date such substitution is to take place. Such substitution shall be made at the request and expense of the Contractor. The securities shall be one or more of the following types:
(a) Bonds or interest-bearing notes or obligations of the United States, or those for which the faith and credit of the United States are pledged for the payment of principal and interest. (b) Bonds or interest-bearing notes on obligations that are guaranteed as to principal and interest by a federal agency of the United States.
(c) Bonds of the State of California, or those for which the faith and credit of the State of California are pledged for the payment of principal and interest.
(d) Bonds or warrants, including, but not limited to, revenue warrants, of any county, city, metropolitan water district, California water district, California water storage district, irrigation district in the State of California, municipal utility district, or school district of the State of California, which are rated by Moody's or Standard and Poor as A or better. (e) Bonds, consolidated bonds, collateral trust debentures, consolidated debentures, or other obligations issued by federal land banks or federal intermediate credit banks established under the Federal Farm Loan Act, as amended; debentures and consolidated debentures issued by the Central Bank for Cooperatives and banks for cooperatives established under the Farm Credit Act of 1933, as amended; bonds, or debentures of the Federal Home Loan Bank Board established under the Federal Home Loan Bank Act; and stock, bonds, debentures and other obligations of the Federal National Mortgage Association established under the National Housing Act as amended and bonds of any Federal Home Loan Mortgage Corporation. (f) Commercial paper of "prime" quality as defined by a nationally recognized organization which rates such securities. Eligible paper is further limited to issuing corporations: (1) organized and operating within the United States; (2) having total assets in excess of five hundred million dollars ($500,000,000); and (3) approved by the Pooled Money Investment Board of the State of California.

Purchases of eligible commercial paper may not exceed 180 days' maturity, nor represent more than 10 percent of the outstanding paper of an issuing corporation. (g) Bills of exchange or time drafts on and accepted by a commercial bank, otherwise known as bankers acceptances, which are eligible for purchase by the Federal Reserve System. (h) Certificates of deposits issued by a nationally or state-chartered bank or savings and loan association.
(i) The portion of bank loans and obligations guaranteed by the United States Small Business Administration or the United States Farmers Home Administration. (j) Student loan notes insured under the Guaranteed Student Loan Program established pursuant to the Higher Education Act of 1965, as amended (20 U.S.C. 1001, et seq.) and eligible for resale to the Student Loan Marketing Association established pursuant to Section 133 of the Education Amendments of 1972, as amended (20 U.S.C. 1087-2).
(k) Obligations issued, assumed or guaranteed by International Bank for Reconstruction and Development, the Inter-American Development Bank, the Asian Development Bank, or the Government Development Bank of Puerto Rico.
(l) Bonds, debentures and notes issued by corporations organized and operating within the United States. Such securities eligible for substitution shall be within the top three ratings of a nationally recognized rating service.

2. The securities shall be deposited with City or with any commercial bank as escrow agent, who shall arrange for transfer of such securities to the Contractor upon satisfactory completion of the contract. Any interest accrued or paid on such securities shall belong to the Contractor and shall be paid upon satisfactory completion of the contract.

Page 427 of 1198 ends

THICKENING AND DEWATERING IMPROVEMENTS 23 Spec No. 23-02 The market value of the securities deposited shall at all times be maintained in an amount at least equal, in the sole judgment of City, to the moneys to be withheld pursuant to the Contract Documents to ensure performance of the Contract. In order to comply with this condition, Contractor shall deposit additional securities as necessary upon request by City or the escrow agent.

3. Upon acceptance of any Proposal that includes substituting securities for amounts withheld to ensure performance, a separate escrow agreement satisfactory in form and substance to City shall be prepared and executed by City, the Contractor and the escrow agent, which may be City. The escrow agreement shall specify, among other matters, value of securities to be deposited; procedures for valuing the securities and for adding or withdrawing securities to maintain the market value of the deposited securities at least equal to the amount of moneys which would otherwise be withheld; the terms and conditions of conversion to cash in case of the default by the Contractor; and terms, conditions and procedure for termination of the escrow. City shall have no obligation to enter any such Agreement that does not provide the City with the unilateral right to convert securities to cash and to gain immediate possession of the cash. 10-04. Acceptance. The work must be accepted by vote of the City Council of the City of Ukiah when the whole shall have been completed satisfactorily. The Contractor shall notify the Engineer, in writing, of the completion of the work, whereupon the Engineer shall promptly, by personal inspection, satisfy himself as to the actual completion of the work in accordance with the terms of the contract and shall thereupon recommend acceptance by the City Council.
10-05. Final Estimate and Payment. The Engineer shall, as soon as practicable after the final acceptance of the work done under this contract, make a final estimate of the amount of work done thereunder and the value thereof.

Such final estimate shall be signed by the Engineer, and after approval, the City shall pay or cause to be paid to the Contractor, in the manner provided by law, the entire sum so found to be due hereunder, after deducting therefrom all previous payments and such other lawful amounts as the terms of this contract prescribe.

In no case will final payment be made in less than thirty-five (35) days after the filing of the notice of completion with the County Recorder.
10-06. Delay Payments. Should any payment due the Contractor or any estimate be delayed, through fault of the City beyond the time stipulated, such delay shall not constitute a breach of contract or be the basis for a claim for damages, but the City shall pay the Contractor interest on the amount of the payment at the rate of 6 percent per annum for the period of such delay. The terms for which interest will be paid shall be reckoned, in the case of any monthly or progress payment, from the twentieth day of the month next succeeding the month in which the work was performed to the date of payment of the estimate; and in the case of the final estimate, from the forty-fifth day after acceptance to the date of payment of the final estimate.

The date of payment of any estimate shall be considered the day on which the payment is offered or mailed as evidenced by the records of the Treasurer of the City. If interest shall become due on any delayed payment, the amount thereof, as determined by the City, shall be added to a succeeding payment. If the interest shall become due on the final payment, it shall be paid on a supplementary voucher to interest or any sum or sums which, by the terms of this contract, the City is authorized to reserve or retain. 10-07. Extra Work and Work Omitted. Whenever corrections, alterations, or modifications of the work under this contract ordered by the Engineer and approved by the City increase the amount of work to be done, such added work shall be known as "extra work"; and when such corrections, alterations, or modifications decrease the amount of work to be done, such subtracted work shall be known as "work omitted".

Page 428 of 1198 ends

THICKENING AND DEWATERING IMPROVEMENTS 24 Spec No. 23-02 When the Contractor considers that any changes ordered involve extra work, he or she shall immediately notify the Engineer in writing and subsequently keep him or her informed as to when and where extra work is to be performed and shall make claim for compensation therefor each month not later than the first day of the month following that in which the work claimed to be extra work was performed and he or she shall submit a daily complete statement of materials and labor used and expenses incurred on account of extra work performed, showing allocation of all materials, labor and expenses.

All such claims shall state the date of the Engineer's written order and the date of approval by the City authorizing the work on account of which claim is made. Unless such notification is made in writing within the time specified and unless complete statements of materials used and expenses incurred on account of such extra work are furnished as above required, the Contractor shall not be entitled to payment on account of extra work and Contractor shall be deemed to have waived the right to make any future claims for compensation for such extra work.

When changes decrease the amount of work to be done, they shall not constitute a claim for damages on account of anticipated profits on the work that may be omitted. 10-08. Compensation for Extra Work or Work Omitted. Whenever corrections, additions, or modifications in the work under this contract change the amount of work to be done or the amount of compensation due the Contractor, excepting increases or decreases in contract items having unit contract prices for each measurable quantity installed in place, and such changes have been ordered in writing by the Engineer and approved by the City prior to the Contractor performing the extra work, then a price may be agreed upon. Failing such an agreement in price, the Contractor shall be compensated for performing extra work pursuant to the provisions of Section 4-1.03 D, "Extra Work", and Section 9-1.03,"Force Account Payment" of the Standard Specifications.

This method of determining the price of work shall not apply to the performance of any work which is required or reasonably implied to be performed or furnished under this contract. 10-09. Compensation to the City for Extension of Time. In case the work called for under this contract is not completed within the time limit stipulated herein, the City shall have the right as provided hereinabove, to extend the time of completion thereof. If the time limit be so extended, the City shall have the right to charge to the Contractor and to deduct from the final payment for the work the actual cost to the City of engineering, inspection, superintendence and other overhead expenses which are directly chargeable to the contract and which accrue during the period of such extension, except that the cost of final unavoidable delays shall not be included in such charges.
10-10. Liquidated Damages for Delay. It is agreed by the parties to the contract that time is of the essence and that, in case all the work is not completed before or upon the expiration of the time limit as set forth, damage, other than those cost items identified in section 10-09, will be sustained by the City and that it is and will be impracticable to determine the actual amount of damage by reason of such delay; and it is therefore agreed that the Contractor will pay to the City the sum of five hundred dollars ($500.00) per day for each and every calendar day's delay beyond the time prescribed.

In compliance with the provisions of California Public Contract Code § 7102, the Contractor will be compensated for damages incurred due to delays in completing the work due solely to the fault of the City, where such delay is unreasonable under the circumstances and not contemplated by the parties. The Contractor and City agree that determining actual damages is impracticable and extremely difficult. As such, the Contractor shall be entitled to the appropriate time extension and to payment of liquidated damages in the sum of $250 per day of delay in excess of the time specified for the completion of the work.

Such amount shall constitute the only payment allowed and shall necessarily include all overhead (direct or indirect), all profit, all administrative costs, all bond costs, all labor, materials, equipment and rental costs, and any other costs, expenses and fees incurred or sustained as a result of such delay. The Contractor expressly agrees to be limited solely to the liquidated damages for all such delays as defined in this subsection.

Page 429 of 1198 ends

THICKENING AND DEWATERING IMPROVEMENTS 25 Spec No. 23-02 SECTION 11. MISCELLANEOUS
11-01. Notice. Whenever any provision of the contract documents requires the giving of written notice, it shall be deemed to have been validly given if delivered in person to the individual or to a member of the firm or to an officer of the corporation for whom it is intended, or if delivered at or sent by registered or certified mail, postage prepaid, to the last business address known to the giver of the notice. If mailed, the notice shall be deemed received on the date of delivery stated in the return receipt. 11-02. Computation of Time. When any period of time is referred to in the Contract Documents by days, it shall be computed to exclude the first and include the last day of such period. If the last day of any such period falls on a Saturday or Sunday or on a day made a legal holiday by the law of the applicable jurisdiction, such day shall be omitted from the computation. 11-03. Claims Procedure
Contractor shall timely comply with all notices and requests for changes to the contract time or contract price, as a prerequisite to filing any claim governed by this Article. The failure to timely submit a notice of delay or notice of change, or to timely request a change to the contract time or contract price, or to timely provide any other notice or request required herein shall constitute a waiver of the right to further pursue the claim under the contract or at law.

A. Intent. Effective January 1, 1991, Section 20104 et seq., of the California Public Contract Code prescribes a process utilizing informal conferences, non-binding judicial supervised mediation, and judicial arbitration to resolve disputes on construction claims of $375,000 or less. Effective January 1, 2017, Section 9204 of the Public Contract Code prescribes a process for negotiation and mediation to resolve disputes on construction claims. The intent of this Article is to implement Sections 20104 et seq. and Section 9204 of the California Public Contract Code. This Article shall be construed to be consistent with said statutes.

B. Claims. For purposes of this Article, “Claim” means a separate demand by the Contractor, for (A) a time extension, (B) payment of money or damages arising from work done by or on behalf of the Contractor pursuant to the Contract, or (C) an amount the payment of which is disputed by the District. Claims governed by this Article may not be filed unless and until the Contractor completes all procedures for giving notice of delay or change and for the requesting of a time extension or change order. Claims governed by this Article must be filed no later than the date of final payment.

The claim shall be submitted in writing to the District and shall include on its first page the following in 16 point capital font: “THIS IS A CLAIM.” Furthermore, the claim shall include the documents necessary to substantiate the claim. Nothing herein is intended to extend the time limit or supersede notice requirements otherwise provided by contract for the filing of claims, including all requirements pertaining to compensation or payment for extra work, disputed work, and/or changed conditions. Failure to follow such contractual requirements shall bar any claims or subsequent lawsuits for compensation or payment thereon.

C. Supporting Documentation. The Contractor shall submit all claims in the following format:

Summary of claim merit and price, reference Contract Document provisions pursuant to which the claim is made

Page 430 of 1198 ends

THICKENING AND DEWATERING IMPROVEMENTS 26 Spec No. 23-02 List of documents relating to claim:

Specifications
Drawings
Clarifications (Requests for Information)
Schedules
Other
Chronology of events and correspondence
Analysis of claim merit
Analysis of claim cost
Time impact analysis in CPM format
If Contractor’s claim is based in whole or in part on an allegation of errors or omissions in the Drawings or Specifications for the project, Contractor shall provide a summary of the percentage of the claim subject to design errors or omissions and shall obtain a certificate of merit in support of the claim of design errors and omissions.

D. City’s Response. Upon receipt of a claim pursuant to this Article, City shall conduct a reasonable review of the claim and, within a period not to exceed 45 days, shall provide the Contractor a written statement identifying what portion of the claim is disputed and what portion is undisputed. Any payment due on an undisputed portion of the claim will be processed and made within 60 days after the City issues its written statement.

If the City needs approval from its governing body to provide the Contractor a written statement identifying the disputed portion and the undisputed portion of the claim, and the City’s governing body does not meet within the 45 days or within the mutually agreed to extension of time following receipt of a claim sent by registered mail or certified mail, return receipt requested, the City shall have up to three days following the next duly publicly noticed meeting of the City’s governing body after the 45-day period, or extension, expires to provide the Contractor a written statement identifying the disputed portion and the undisputed portion.

Within 30 days of receipt of a claim, the City may request in writing additional documentation supporting the claim or relating to defenses or claims the District may have against the Contractor. If additional information is thereafter required, it shall be requested and provided pursuant to this subdivision, upon mutual agreement of City and the Contractor. The City’s written response to the claim, as further documented, shall be submitted to the Contractor within 30 days (if the claim is less than $15,000, within 15 days) after receipt of the further documentation, or within a period of time no greater than that taken by the Contractor in producing the additional information or requested documentation, whichever is greater.

E. Meet and Confer. If the Contractor disputes the City’s written response, or the City fails to respond within the time prescribed, the Contractor may so notify the City, in writing, either within 15 days of receipt of the City’s response or within 15 days of the City’s failure to respond within the time prescribed, respectively, and demand in writing an informal conference to meet and confer for settlement of the issues in dispute. Upon receipt of a demand, the City shall schedule a meet and confer conference within 30 days for settlement of the dispute.

F. Mediation. Within 10 business days following the conclusion of the meet and confer conference, if the claim or any portion of the claim remains in dispute, the City shall provide the Contractor a written statement identifying the portion of the claim that remains in dispute and the portion that is undisputed. Any payment due on an undisputed portion of the claim shall be processed and made within 60 days after the City issues its written statement. Any disputed portion of the claim, as identified by the Contractor in writing, shall be submitted to nonbinding mediation, with the City and the Contractor sharing the associated costs equally. The City and Contractor shall mutually agree to a mediator within 10 business days after the disputed portion of the claim has been identified in writing, unless the parties agree to select a mediator at a later time.

Page 431 of 1198 ends

THICKENING AND DEWATERING IMPROVEMENTS 27 Spec No. 23-02 If the parties cannot agree upon a mediator, each party shall select a mediator and those mediators shall select a qualified neutral third party to mediate with regard to the disputed portion of the claim. Each party shall bear the fees and costs charged by its respective mediator in connection with the selection of the neutral mediator.

For purposes of this section, mediation includes any nonbinding process, including, but not limited to, neutral evaluation or a dispute review board, in which an independent third party or board assists the parties in dispute resolution through negotiation or by issuance of an evaluation. Any mediation utilized shall conform to the timeframes in this section.

Unless otherwise agreed to by the City and the Contractor in writing, the mediation conducted pursuant to this section shall excuse any further obligation under Public Contract Code Section 20104.4 to mediate after litigation has been commenced.

The mediation shall be held no earlier than the date the Contractor completes the work or the date that the Contractor last performs work, whichever is earlier. All unresolved claims shall be considered jointly in a single mediation, unless a new unrelated claim arises after mediation is completed.

G. Procedures After Mediation. If following the mediation, the claim or any portion remains in dispute, the Contractor must file a claim pursuant to Chapter 1 (commencing with Section 900) and Chapter 2 (commencing with Section 910) of Part 3 of Division 3.6 of Title 1 of the Government Code prior to initiating litigation. For purposes of those provisions, the running of the period of time within which a claim must be filed shall be tolled from the time the Contractor submits his or her written claim pursuant to subdivision (a) until the time the claim is denied, including any period of time utilized by the meet and confer conference.

H. Civil Actions. The following procedures are established for all civil actions filed to resolve claims of $375,000 or less:

Within 60 days, but no earlier than 30 days, following the filing or responsive pleadings, the court shall submit the matter to non-binding mediation unless waived by mutual stipulation of both parties or unless mediation was held prior to commencement of the action in accordance with Public Contract Code section 9204 and the terms of this Contract. The mediation process shall provide for the selection within 15 days by both parties of a disinterested third person as mediator, shall be commenced within 30 days of the submittal, and shall be concluded within 15 days from the commencement of the mediation unless a time requirement is extended upon a good cause showing to the court.

If the matter remains in dispute, the case shall be submitted to judicial arbitration pursuant to Chapter 2.5 (commencing with Section 1141.10) of Title 3 of Part 3 of the Code of Civil Procedure, notwithstanding Section 1114.11 of that code. The Civil Discovery Act of 1986 (Article 3 (commencing with Section 2016) of Chapter 3 of Title 3 of Part 4 of the Code of Civil Procedure) shall apply to any proceeding brought under this subdivision consistent with the rules pertaining to judicial arbitration. In addition to Chapter 2.5 (commencing with Section 1141.10) of Title 3 of Part 3 of the Code of Civil Procedure, (A) arbitrators shall, when possible, be experienced in construction law, and (B) any party appealing an arbitration award who does not obtain a more favorable judgment shall, in addition to payment of costs and fees under that chapter, also pay the attorney’s fees on appeal of the other party.

I. Government Code Claims. In addition to any and all contract requirements pertaining to notices of and requests for compensation or payment for extra work, disputed work, construction claims and/or changed conditions, the Contractor must comply with the claim procedures set forth in Government Code Sections 900, et seq. prior to filing any lawsuit against the City. Such Government Code claims and any subsequent lawsuit based upon the Government Code claims shall be limited to those matters that remain unresolved after all procedures pertaining to extra work, disputed work, construction claims, and/or changed conditions have been followed by Contractor. If no such Government Code claim is submitted, or if the prerequisite contractual requirements are not satisfied, no action against the City may be filed. A Government Code claim must be filed no earlier than the date the work is completed or the date the Contractor last performs work on the project, whichever occurs first. A Government Code claim shall be inclusive of all unresolved claims unless a new unrelated claim arises after the Government Code claim is submitted.

Page 432 of 1198 ends

THICKENING AND DEWATERING IMPROVEMENTS 28 Spec No. 23-02 J. Non-Waiver. The City’s failure to respond to a claim from the Contractor within the time periods described in this Article or to otherwise meet the time requirements of this Article shall result in the claim being deemed rejected in its entirety.
11-04. Litigation and Forum Selection. Contractor and City stipulate and agree that any litigation relating to the enforcement or interpretation of this contract, arising out of Contractor's performance or relating in any way to the work shall be brought in Mendocino County and that venue will lie in Mendocino County.

Except as otherwise expressly provided by law, the parties waive any objections they might otherwise have to the propriety of jurisdiction or venue in the state courts in Mendocino County and agree that California law shall govern any such litigation.

The duties and obligations imposed by these General Conditions and the rights and remedies available hereunder to the parties hereto and, in particular but without limitation, the warranties, guaranties and obligations imposed upon the Contractor and all of the rights and remedies available to the City thereunder, shall be in addition to and shall not be construed in any way as a limitation of, any rights and remedies available to any or all of them which are otherwise imposed or available by law or contract, by special warranty or guaranty, or by other provisions of the contract documents and the provisions of this paragraph shall be as effective as if repeated specifically in the contract documents in connection with each particular duty, obligation, right and remedy to which they apply. All warranties and guaranties made in the contract document shall survive final payment and termination or completion of this contract. The City disclaims an express or implied warranty that the plans and specifications identify all site conditions that could affect the time or cost to complete the Work.
11-05. Waiver. The Contractor shall strictly comply with all notices and other contract requirements.

Waiver by the City of any failure of the Contractor to comply with any term of the contract, including the notice provisions, shall not be deemed a waiver of a subsequent breach.

Page 433 of 1198 ends

THICKENING AND DEWATERING IMPROVEMENTS 29 Spec No. 23-02

TECHNICAL SPECIFICATIONS
SECTION 12. GENERAL INFORMATION
12-01. Location and Scope of Work. All of the work to be performed is within the City of Ukiah and consists of following:

1. Demolition of existing equipment, piping and valves, concrete and various other items in the DAFT and Dewatering areas as shown on the drawings

2. Assembly and installation of a Suspended Air Flotation (SAF) System that was prepurchased by the Owner

3. Furnishing and installing a container structure to house the Suspended Air Flotation Feed System

4. Furnishing and installation of two Polymer Systems in the existing DAFT Building

5. Installation of 8-inch diameter piping from the Plant Drain Pump Station to a connection point with the 8-inch Washwater Piping

6. Furnishing and installation of variable speed drives for the existing Washwater Pumps and Primary Scum Pumps

7. Assembly and installation of a Screw Press Dewatering and Polymer Blending System that was pre-purchased by the Owner

8. Construction of a concrete containment area for dewatered sludge cake

9. Furnishing and installing all mechanical, structural, electrical and instrumentation and controls associated with above items and as shown on the drawings General locations of the work are at the Ukiah WWTP, 300 Plant Road, Ukiah, CA 95482.

The Contractor should familiarize himself with the local conditions of the project sites. Failure to do so will in no way relieve him of the responsibility for performing any of the work or operations required as a part of this contract. Further information regarding the work or these specifications can be obtained from Seth Strader at (707) 463-6233.
12-02. Arrangement of Technical Specifications. The Technical Specifications are arranged in sections covering the various phases of work as follows:

Section No. Title
12 General Information
13 Construction Details (Not Used)
14 Exclusions from General Conditions
15 Amendments to General Conditions
12-03. Arrangement of Plans. General locations and linear quantities of the work are shown in Appendix "A". A map will be provided to the successful bidder showing the exact locations of the work to be done.

Page 434 of 1198 ends

THICKENING AND DEWATERING IMPROVEMENTS 30 Spec No. 23-02 12-04. Business Licenses. The Contractor and any subcontractors shall each secure and maintain a valid City of Ukiah Business License prior to the start of any portion of the work. 12-05. Permits. The Contractor shall provide, procure, and pay for all permits required to complete this work.
12-06. Standard Specifications and Standard Plans. The Standard Specifications and Standard Plans of the California State Department of Transportation, 2018, are hereby made a part of these Special Provisions and are hereinafter referred to as "California Standard Specifications" and "California Standard Plans."
Whenever in the California Standard Specifications and the California Standard Plans the following terms are used, they shall be understood to mean and refer to the following:

Department of Transportation - The City Council.

Director of Public Works - The City of Ukiah Director of Public Works.

Engineer - The Engineer, designated by the City Council, acting either directly or through properly authorized agents, such agents acting within the scope of the particular duties entrusted to them.

Laboratory - The designated laboratory authorized by the City of Ukiah to test materials and work involved in the contract.

State - The City of Ukiah
Other terms appearing in the California Standard Specifications and the California Standard Plans shall have the intent and meaning specified in Section I, Definition of Terms of the California Standard Specifications.

In case of discrepancy between the contract documents, the order of precedence from the highest to lowest is as follows:

1. (City) Special Provisions

2. (City) Project Plans

3. City Standard Plans and Details

4. California Standard Plans

5. California Standard Specifications
12-07. Temporary Facilities. All temporary facilities are the responsibility of the Contractor. The removal of said facilities shall be the responsibility of the Contractor. The Contractor shall be responsible for any and all damages to existing facilities which are a result of the work. 12-08. Public Convenience and Safety. The Contractor shall conduct operations so as to cause the least possible obstruction and inconvenience to public traffic. The Contractor shall, at his or her expense, furnish such flag persons and furnish, erect, construct and maintain such fences, barriers, lights, signs, detours, pedestrian walkways, driveway ramps and bridging as may be necessary to give adequate warning to the public that work is in progress and that dangerous conditions exist, to provide access to abutting properties and to permit the flow of pedestrian and vehicular traffic to safely and expeditiously pass the work. 12-09. Maintaining Traffic. Attention is directed to Section 7-1.08, "Public Convenience," 7-1.09, "Public Safety," 7-1.092, "Lane Closure," and 7-1.095, "Flagging Costs," of the California Standard Specifications.

Streets shall be open to through vehicular traffic during non-working hours. All public traffic shall be permitted to pass through the work with as little inconvenience and delay as possible.

Page 435 of 1198 ends

THICKENING AND DEWATERING IMPROVEMENTS 31 Spec No. 23-02 Full costs for "Maintaining Traffic", including "Flagging Costs", shall be considered as included in the various items of work and no additional compensation will be made.

12.10. Stream Pollution. The Contractor shall exercise every reasonable precaution to prevent muddying or silting of live streams, and the Contractor's attention is called to the fact that the terms of this contract do not relieve him or her of responsibility for compliance with Sections 5650 and 12015 of the Fish and Game Code or other applicable statutes relating to pollution prevention or abatement. 12-11. Warranties. Unless otherwise indicated, the Contractor shall warrant all materials provided and work performed under this contract for a period of one year from the date of final acceptance. He shall replace promptly and at his own expense any materials and/or workmanship which fail during this warranty period.
12-12. Utilities. No water, sewer or electrical services will be provided by the owner. It is the Contractor's sole responsibility to arrange such services as necessary. 12-13. Preconstruction Conference. A preconstruction conference will be held before any work will be allowed to commence. This meeting will cover inspection, schedule for work, and among other items, the responsibilities and procedures of each of the interested parties to assure that the project will be completed in accordance with the contract documents.
12-14. Safety Requirements. The Contractor shall comply with all pertinent provisions of the Department of Labor "Safety and Health Regulations for Construction (29 FCS Part 1518, 36 CFR 7340)", with additions or modifications thereto, in effect during construction of this project.

SECTION 13 - CONSTRUCTION DETAILS (NOT USED)
SECTION 14. EXCLUSIONS FROM GENERAL CONDITIONS
14-01. Provisions to be Excluded from General Conditions. The following designated provisions of the General Conditions are hereby determined to be inapplicable to the proposed work and, therefore, are hereby excluded from the terms of the Notice to Bidders, Proposal, Agreement and other contract documents as though entirely omitted from said General Conditions:

Section 6-02. Office at the Site
Section 7-03. Surveys
No other exclusions.

SECTION 15. AMENDMENTS TO GENERAL CONDITIONS
15-01. Sections of General Conditions to be Amended.

The following designated sections of the Special Provisions are hereby amended to read as follows:

No amendments.

Page 436 of 1198 ends

THICKENING AND DEWATERING IMPROVEMENTS 32 Spec No. 23-02

CERTIFICATES AND DOCUMENTS

BID SUBMITTAL CHECKLIST
The following is a checklist to assist you in your submission of your bid documents. Please make sure you include the following when submitting your bid documents to reduce the risk of having your bid rejected:

Did you include?...
o Proposal (Page 33)
➢ Unit prices filled out clearly.
➢ Extended prices filled out clearly and calculated correctly ➢ Total bid amount filled out clearly and calculated correctly ➢ Sign the proposal, and provide complete information
➢ CLSB No. and expiration date
➢ Department of Industrial Relations Public Works Contractor Registration Number o Fair Employment Practices Certification (Page 37)
➢ Filled out completely per instruction
o Worker’s Compensation Certificate (Page 38)
➢ Filled out completely per instruction
o Certification of Non-Discrimination in Employment (Page 39) ➢ Filled out completely per instruction
o List of Proposed Subcontractors (Page 40)
➢ Filled out completely per instruction
o Statement of Experience (Page 41)
o Signature of Bidder (Page 42)
➢ Filled out completely per instruction
➢ Authorized signature provided
o Bidder’s Bond (Page 43)
➢ Filled out completely per instruction
o Non-Collusion Affidavit (Page 45)
➢Filled out completely per instruction
➢ Notarized
o Addenda Issued
➢ Check the City website for any addenda issued: www.cityofukiah.com/purchasing.

Page 437 of 1198 ends

THICKENING AND DEWATERING IMPROVEMENTS 33 Spec No. 23-02

CITY OF UKIAH

MENDOCINO COUNTY, CALIFORNIA

PROPOSAL
FOR

THICKENING AND DEWATERING IMPROVEMENTS
Specification No. 23-02
The undersigned, as bidder,
declares that he or she has examined thoroughly all of the contract documents herein contained, that this proposal is made without collusion with any other person, firm or corporation and that all laws and ordinances relating to the interest of public officers in this contract have been complied with in every respect.

AND he or she proposes and agrees, if this proposal is accepted, 1) that he or she will contract with the City of Ukiah, Mendocino County, California, in the form of the copy of the agreement herein contained
a) to provide all necessary machinery, tools, apparatus and other means of construction; b) to furnish all materials;
c) to provide all superintendence, overhead expenses and all labor and expenses of whatever nature necessary to complete the job in conformity with the specifications and drawings and other contract provisions herein or reasonably implied hereby or as necessary to complete the work in the manner and within the time named herein and according to the requirements and to the reasonable satisfaction of the City Engineer; d) to pay all charges of freight transportation and hauling; 2) that he or she indemnifies the City against any loss or damage arising from any act of the undersigned as Contractor; and
3) that he or she will accept as full payment therefor the following sums:

Page 438 of 1198 ends

THICKENING AND DEWATERING IMPROVEMENTS 34 Spec No. 23-02

BIDDING SCHEDULE
In the case of any discrepancy between the unit price and the total set forth for the item, the unit price shall prevail; provided, however, that if the amount set forth as a unit price is ambiguous, unintelligible or uncertain for any reason, or is omitted, or in the case of lump sum items, is not the same amount as the entry in the “Total” column, then the amount set forth in the “Total” column for the item shall prevail in accordance with the following:

As to lump sum items, the amount set forth in the “Total” column shall be the unit price; As to unit basis items, the amount set forth in the “Total” column shall be divided by the estimated quantity for the item and the price thus obtained shall be the unit price.

The Total Base Bid shall be the sum of the items in the “Total” column. In case of discrepancy between the sum of the items in the “Total” column and the amount entered as Total Base Bid, the sum of the “Total” column items shall prevail. The bid comparison will be based on the sum of the items in the “total” column for each bidder.

The Unit prices for the various Construction Items below include all costs associated with the General Conditions, Special Provisions, Requirements of the Construction Contract, and represent the total, complete, in-place cost for each specific Construction Item in accordance with the Construction Documents, including all elements, work components, accessories, and connections, shown in applicable details or required to yield a complete, sound and functional component or system appropriate for its intended function, whether or not such is specifically described or listed in any description of measurement or payment. The total amount of the Construction items below shall represent the total and complete cost of the fully functional Project. All work not specifically listed below be required to complete the work of the various construction items and the cost of such shall be considered as included throughout the various unit prices indicated.

Lowest bid will be based on the lowest Base Bid.

NAME OF BIDDER:

SPEC No.: 23-02
PROJECT NAME: Thickening and Dewatering Improvements
Signature
ITEM# DESCRIPTION UNIT OF

MEASURE QUANTITY UNIT PRICE TOTAL
1 Mobilization/Demobilization LS 1 $__________ $__________________ 2 Workers Protection and
Safety/Shoring LS 1 $__________ $__________________
3 SAF System (Area 70) LS 1 $__________ $__________________ 4 Dewatering System (Area 75) LS 1 $__________ $__________________ 5 Temporary Dewatering System Dry Tons $__________ $__________________ TOTAL BID ==>> $__________________

Page 439 of 1198 ends

THICKENING AND DEWATERING IMPROVEMENTS 35 Spec No. 23-02 We, the undersigned, acknowledge that the City Council has reserved the right to reject any or all bids and to determine which proposal is, in its opinion, the lowest responsive bid from a responsible bidder and that which it deems in the best interest of the City to accept. We, the undersigned, further agree, if this proposal shall be accepted, to sign the agreement and to furnish the required bonds with satisfactory surety, or sureties, within fifteen (15) calendar days after written notice that the contract is ready for signature; and, if the undersigned shall fail to contract, as aforesaid, it shall be understood that he or she has abandoned the contract and that, therefore, this proposal shall be null and void and the proposal guaranty accompanying this proposal, or the amount of said guaranty, shall be forfeited to and become the property of the City.

Otherwise, the proposal guaranty accompanying this proposal shall be returned to the undersigned.

Witness our hands this day of ___________________, 20____.

Licensed in accordance with an act providing for the registration of California Contractors License No. ___________, expiration date _____________.

THE CONTRACTOR'S LICENSE NUMBER AND EXPIRATION DATE STATED HEREIN ARE MADE UNDER PENALTY OF PERJURY.

Department of Industrial Relations Public Works Contractor Registration Number:___________________ Signature of bidder or bidders, with business name, address, phone number and fax number:
_________________________________________________________________ _________________________________________________________________ _________________________________________________________________ _________________________________________________________________ Notice: In the case of a corporation, give below the addresses of the principal office thereof and names and addresses of the President, Secretary, Treasurer.
_________________________________________________________________ _________________________________________________________________ _________________________________________________________________

Page 440 of 1198 ends

THICKENING AND DEWATERING IMPROVEMENTS 36 Spec No. 23-02

FAIR EMPLOYMENT PRACTICES CERTIFICATION
TO:_____________________________________________________________ ________________________________________________________________ The undersigned, in submitting a bid for performing the following work by Contract, hereby certifies that he or she has or will meet the standards of affirmative compliance with the Fair Employment Practices requirements of the Special Provisions contained herein.

THICKENING AND DEWATERING IMPROVEMENTS
________________________________________________________________ (Signature of Bidder)
Business Mailing Address:
_________________________________________________
_________________________________________________
_________________________________________________
Business Location:
_________________________________________________
_________________________________________________
(The bidder shall execute the certification of this page prior to submitting his or her proposal.)

Page 441 of 1198 ends

THICKENING AND DEWATERING IMPROVEMENTS 37 Spec No. 23-02

WORKER'S COMPENSATION CERTIFICATE
I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for Worker's Compensation or undertake self-insurance in accordance with the provisions of that code and I will comply with such provisions before commencing the performance of the work of this contract.

Witness my hand this________ day of _______________, 20____ Signature of Bidder, with Business Address:
__________________________________________________
__________________________________________________
__________________________________________________
__________________________________________________

Page 442 of 1198 ends

THICKENING AND DEWATERING IMPROVEMENTS 38 Spec No. 23-02

CERTIFICATION OF NONDISCRIMINATION IN EMPLOYMENT
The bidder represents that he or she has/has not, participated in a previous contract or subcontract subject to either the equal opportunity clause herein or the clause contained in Section 301 of Executive Order 10925; that he or she has/has not, filed all required compliance reports; and that representations indicating submission of required compliance prior to subcontract awards.

Signature and address of Bidder:
__________________________________________________ Date_____________ __________________________________________________
__________________________________________________
__________________________________________________
(This certification shall be executed by the bidder in accordance with Section 60-1.6 of the Regulations of the President's Committee on Equal Employment Opportunity for implementing Executive Orders 10925 and 11114.)

Page 443 of 1198 ends

THICKENING AND DEWATERING IMPROVEMENTS 39 Spec No. 23-02

LIST OF PROPOSED SUBCONTRACTORS
In compliance with the provisions of Sections 4100-4108 of the California Public Contract Code and any amendments thereof, each bidder shall set forth (a) the name and location of the place of business of each subcontractor who will perform work or labor or render service in or about the construction site or a subcontractor licensed by the State of California who, under subcontract to the prime contractor, specially fabricates and installs a portion of the work or improvement according to detailed drawings contained in the plans and specifications in an amount in excess of one-half of 1 percent of the total bid and (b) the California Contractor License Number for each subcontractor, and (c) the portion of the work to be done by each subcontractor.(See General Conditions Section 1-09.) Include with the name of each sub-contractor their Department of Industrial Relations Public Works Contractor Registration Number.

SUBCONTRACTOR
NAME

SUBCONTRACTOR

LICENSE NUMBER

SUBCONTRACTOR
DIR

REGISTRATION
NUMBER

SUBCONTRACTOR

BUSINESS

ADDRESS

DESCRIPTION

OF WORK

Page 444 of 1198 ends

THICKENING AND DEWATERING IMPROVEMENTS 40 Spec No. 23-02

STATEMENT OF EXPERIENCE OF BIDDER
The bidder is required to state below what work of similar magnitude or character he or she has done and to give references that will enable the City Council to judge of his or her experience, skill and business standing and his or her ability to conduct work as completely and rapidly as required under the terms of the contract.
____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________

Page 445 of 1198 ends

THICKENING AND DEWATERING IMPROVEMENTS 41 Spec No. 23-02

SIGNATURE(S) OF BIDDER
Accompanying this proposal is ___________________________________ (insert the words "cash ($)", "cashier's check" or "bidder's bond", as the case may be) in an amount equal to at least 10 percent of the bid.

The names of all persons interested in the foregoing proposal as principals are as follows:

IMPORTANT NOTICE: If bidder or other interested person is a corporation, provide the legal name of corporation and also the names of the president, secretary, treasurer and manager thereof. If a copartnership, provide the true name of firm and also the names of all individual co-partners composing the firm. If bidder or other interested person is an individual, provide the first and last names in full. _________________________________________________________________ _________________________________________________________________ _________________________________________________________________ Licensed in accordance with an act providing for the registration of Contractors:

License No. ______________________________, License Expiration Date .

Signature(s) of Bidder: ______________________________________________ ______________________________________________
______________________________________________
NOTE: If bidder is a corporation, the legal name of the corporation shall be set forth above together with the signature of the officer or officers authorized to sign contracts on behalf of the corporation; if bidder is a co-partnership, the true name of the firm shall be set forth above together with the signature of the partner or partners authorized to sign contracts in behalf of the co-partnership; and if bidder is an individual, his or her signature shall be placed above. If a member of a partnership, a Power of Attorney must be on file with the Department prior to opening bids or submitted with the bid; otherwise, the bid will be disregarded as irregular and unauthorized.

Business address: ___________________________________________________ ___________________________________________________
Place of residence: ___________________________________________________ ___________________________________________________
Dated: __________________

Page 446 of 1198 ends

THICKENING AND DEWATERING IMPROVEMENTS 42 Spec No. 23-02

CITY OF UKIAH
Mendocino County, California

BIDDER'S BOND

KNOW ALL MEN BY THESE PRESENTS,
That we, ______________________________________________________________ ________________________________________________________________, as PRINCIPAL and ________________________________________________________________ ________________________________________________________________, as SURETY, are held and firmly bound unto the City of Ukiah in the penal sum of 10 PERCENT OF THE TOTAL AMOUNT OF THE BID of the Principal above named, submitted by said Principal to the City of Ukiah, as the case may be, for the work described below, for the payment of which sum in lawful money of the United States, well and truly to be made, to the City Clerk to which said bid was submitted, we bind ourselves, our heirs, executors, administrators and successors jointly and severally, firmly by these presents. In no case shall the liability of the surety hereunder exceed the sum of $____________________

THE CONDITION OF THIS OBLIGATION IS SUCH,
That whereas the Principal has submitted the above mentioned bid to the City of Ukiah, as aforesaid, for certain construction specifically described as follows, for which bids are to be opened at the Office of the City Clerk, Ukiah Civic Center, Ukiah, California, on April 20, 2023 for THICKENING AND DEWATERING

IMPROVEMENTS
NOW, THEREFORE, If the aforesaid Principal is awarded the contract and, within the time and manner required under the specifications, after the prescribed forms are presented to him or her for signatures, enters into a written contract, in the prescribed form, in accordance with the bid and files two bonds with the City of Ukiah, one to guarantee faithful performance and the other to guarantee payment for labor and materials, as required by law, then this obligation shall be null and void; otherwise, it shall be and remain in full force and virtue.

IN WITNESS WHEREOF, we have hereunto set our hands and seals on this ______ day of ________________, A.D. 20_____.
__________________________________________________(Seal) __________________________________________________(Seal) __________________________________________________(Seal) Principal
__________________________________________________(Seal) __________________________________________________(Seal) __________________________________________________(Seal) Surety

Page 447 of 1198 ends

THICKENING AND DEWATERING IMPROVEMENTS 43 Spec No. 23-02 Address:

Page 448 of 1198 ends

THICKENING AND DEWATERING IMPROVEMENTS 44 Spec No. 23-02

NON-COLLUSION AFFIDAVIT
Note: Bidder shall execute the affidavit on this page prior to submitting his or her bid.

To City Council, City of Ukiah:

The undersigned in submitting a bid for performing THICKENING AND DEWATERING IMPROVEMENTS by contract, being duly sworn, deposes and says:
that he or she has not, either directly or indirectly, entered into any agreement, participated in any collusion, or otherwise taken any action in restraint of free competitive bidding in connection with such contract.
__________________________________________________
__________________________________________________
__________________________________________________
Signature(s) of Bidder
Business Address:__________________________________________________ __________________________________________________
__________________________________________________
Place of Residence:__________________________________________________ __________________________________________________
__________________________________________________

NOTARIZATION
Subscribed and sworn to before me this ______ day of _________, 20____. __________________________________________________
Notary Public in and for the County of______________________________, State of California.

My Commission Expires ________________________, 20 ____.

Page 449 of 1198 ends

THICKENING AND DEWATERING IMPROVEMENTS 45 Spec No. 23-02

CITY OF UKIAH
Mendocino County, California

AGREEMENT
FOR

THICKENING AND DEWATERING IMPROVEMENTS
Specification No. 23-02
THIS AGREEMENT, made this ______ day of ___________________, 20____, by and between the City of Ukiah, Mendocino County, California, hereinafter called the City and _______________________ hereinafter called the Contractor,
WITNESSETH:

WHEREAS, the City has caused to be prepared in accordance with law, specifications, drawings and other contract documents for the work herein described and shown and has approved and adopted these contract documents, specifications and drawings and has caused to be published in the manner and for the time required by law a notice to bidders inviting sealed proposals for doing the work in accordance with the terms of this contract and
WHEREAS, the Contractor, in response to the notice to bidders, has submitted to the City a sealed proposal accompanied by a proposal guaranty in an amount of not less than 10 percent of the bid price for the construction of the proposed work in accordance with the terms of this contract and WHEREAS, the City, in the manner prescribed by law, has publicly opened, examined and canvassed the proposals submitted and as a result has determined and declared the Contractor to be the lowest and best regular responsible bidder for the work and for the sums named in the proposal, NOW, THEREFORE, THIS AGREEMENT WITNESSETH:

Article 1. Work to be Done and Contract Days Allowed.

That the Contractor shall provide all necessary machinery, tools, apparatus and other means of construction; shall furnish all materials, superintendence, overhead, expenses, all labor and expenses of whatever nature necessary for completion of the work in conformity with the Special Provisions and other contract documents hereto attached and according to such instructions as may be given by the Engineer.

The Contractor shall complete the work within three hundred and thirty-five (335) calendar days. Contract days shall be counted starting with the 10th day following receipt of notice that the contract has been executed by the City. Contractor, at his or her option, may begin work prior to start of counting contract days, however, in no event shall the Contractor start work without giving notification to the Engineer at least 72 hours prior to the start of work, without obtaining an encroachment permit from the City, or without having submitted certificates of insurance that have been accepted and approved by the Engineer Article II. Contract Prices.

That the City shall pay the Contractor the prices stated in the proposal submitted by the Contractor, for complete performance of the contract by the Contractor. The Contractor hereby agrees to accept the prices

Page 450 of 1198 ends

THICKENING AND DEWATERING IMPROVEMENTS 46 Spec No. 23-02 as full compensation for all material and appliances necessary to the work, for all labor and use of tools and other implements necessary to execute the work contemplated in this contract; for all loss or damage arising out of the nature of the work or from the action of the elements, or from any unforeseen obstructions or difficulties which may be encountered in the prosecution of the work; for all risks of every description connected therewith; for all expenses of the work, as herein specified; for all liability and other insurance, for all overhead and other expenses incident to the work; all according to the Contract Drawings, the Special Provisions, the Details, the instructions and the requirements of the City.

Article III. Labor Discrimination.

Attention is directed to Section 1735 of the Labor Code, which reads as follows:
"No discrimination shall be made in the employment of persons upon public works because of the race, color, national origin or ancestry, or religion of such persons and every contractor for public works violating this section is subject to all the penalties imposed for a violation of this chapter." In connection with the performance of work under this contract, the Contractor agrees as follows:
(a) The Contractor will not willfully discriminate against any employee or an applicant for employment because of race, color, religion, ancestry, or national origin. The Contractor will take affirmative action to ensure that applicants are employed and that employees are treated during employment without regard to their race, color, religion, ancestry, or national origin.

Such action shall include, but not be limited to, the following: employment, upgrading, demotion or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship. The Contractor agrees to post in conspicuous places, available to employees and applicants for employment, notices to be provided by the awarding authority setting forth the provisions of this Fair Employment Practice section.
(b) The Contractor will send to each labor union or representative of workers with which he or she has a collective bargaining agreement or other contract or understanding, a notice, to be provided by the awarding authority, advising the said labor union or worker's representative of the Contractor's commitments under this section, to employees and applicants for employment.
(c) The Contractor will permit access to his or her records of employment, employment advertisements, application forms and other pertinent data and records by the Fair Employment Practices Commission, City of Ukiah or any other appropriate agency of the State of California designated by the awarding authority, for the purposes of investigation to ascertain compliance with the Fair Employment Practices section of this contract. (d) A finding of willful violation of the Fair Employment Practices section of this Contract or of the Fair Employment Practices Act shall be regarded by the awarding authority as a basis for determining the Contractor to be not a "responsible bidder" as to future contracts for which such Contractor may submit bids, for revoking the Contractor's pre-qualification rating, if any and for refusing to establish, reestablish or renew a pre-qualification rating for the Contractor.

The City of Ukiah shall deem a finding of willful receipt of written notice from the Fair Employment Practices Act to have occurred upon that it has investigated and determined that the Contractor has violated the Fair Employment Practices Act and has issued an order under Labor Code Section 1426 or obtained an injunction under Labor Code Section 1429.

Upon receipt of such written notice from the Fair Employment Practices Commission, the City shall notify the Contractor that unless he or she demonstrates to the satisfaction of the awarding authority within a stated period that the violation has been corrected, his or her prequalification rating will be revoked at the expiration of such period.

Page 451 of 1198 ends

THICKENING AND DEWATERING IMPROVEMENTS 47 Spec No. 23-02 (e) The Contractor agrees that should the City determine that the Contractor has not complied with the Fair Employment Practices section of this Contract, then pursuant to Labor Code Section 1735 and 1775 the Contractor shall, as a penalty to the City, forfeit for each calendar day or portion thereof, for each person who was denied employment as a result of such noncompliance, the penalties provided in the Labor Code for violation of prevailing wage rates.

Such monies may be recovered from the Contractor. The City may deduct any such damages from any monies due the Contractor.
(f) Nothing contained in this Fair Employment Practices section shall be construed in any manner of fashion so as to prevent the City or the State of California from pursuing any other remedies that may be available at law.
(g) Prior to awarding the Contract, the Contractor shall certify to the awarding authority that he or she has or will meet the following standards for affirmative compliance, which shall be evaluated in each case by the awarding authority:
(1) The Contractor shall provide evidence, as required by the City that he or she has notified all supervisors, foremen and other personnel officers in writing of the content of the antidiscrimination clause and their responsibilities under it. (2) The Contractor shall provide evidence, as required by the City, that he or she has notified all sources of employees’ referrals (including unions, employment agencies, advertisements, Department of Employment) of the content of the anti-discrimination clause. (3) The Contractor shall file a basic compliance report, as required by the City. Willfully false statements made in such reports shall be punishable as provided by law. The compliance report shall also spell out the sources of the work force and who has the responsibility for determining whom to hire, or whether or not to hire.
(4) Personally, or through his or her representatives, the Contractor shall, through negotiations with the unions with whom he or she has agreements, attempt to develop an agreement which will:
a. Spell out responsibilities for nondiscrimination in hiring, referral, upgrading and training.
b. Otherwise implement an affirmative anti-discrimination program in terms of the unions' specific areas of skill and geography to the end that qualified minority workers will be available and given and equal opportunity for employment. (5) The Contractor shall notify the City of opposition to the anti-discrimination clause by individuals, firms or organizations during the period of its pre-qualification. (h) The Contractor will include the provisions of the foregoing paragraphs 1 through 5 in every first tier subcontract so that such provisions will be binding upon each such subcontractor.

The "Fair Employment Practices Certification" must be completed and signed prior to the time of submitting the bid.

Article IV. Parts of the Contract.

That the complete contract consists of the following documents, all of which shall be considered a part of this agreement.

1. Notice to Bidders

2. Wage Rates

3. General Conditions

Page 452 of 1198 ends

THICKENING AND DEWATERING IMPROVEMENTS 48 Spec No. 23-02

4. Technical Specifications

5. Proposal

6. Fair Employment Practices Certification

7. Agreement

8. Contract Bonds

9. Contract Drawings and Construction Details

10. Standard Drawings

11. Indemnification Agreement
IN WITNESS WHEREOF, this contract being executed in duplicate and the parties having caused their names to be signed by authority of their duly authorized office this _____ day of _____________, 20____.

CITY OF UKIAH, MENDOCINO COUNTY, CALIFORNIA
By: ______________________________________________________________

CITY MANAGER, CITY OF UKIAH
Attest: ______________________________________________________________

CITY CLERK, CITY OF UKIAH
By: ______________________________________________________________

CONTRACTOR
Attest: ______________________________________________________________ Title: ______________________________________________________________ The foregoing contract is approved as to form and legality this ______ day of ______________, 20 ____. __________________________________________________

CITY ATTORNEY, CITY OF UKIAH

Page 453 of 1198 ends

THICKENING AND DEWATERING IMPROVEMENTS 49 Spec No. 23-02

INDEMNIFICATION AGREEMENT
This Indemnification Agreement is made and entered in Ukiah, California, on ________________, 20___, by and between the City of Ukiah (Ukiah) and ____________________________________ (Contractor).

Contractor is
_________________________________________________________________________________ ___________________________________________ for Ukiah.

As a condition of issuing the work order, attached hereto, Ukiah requires assurance that Contractor will protect Ukiah from damage or damage claims which arise from its performance of the work.

Accordingly, Contractor agrees as follows:

1. Indemnification. Contractor shall indemnify and hold harmless Ukiah and its officers, agents, and employees from and against any claim, loss, or damage, including the legal and other costs of defending against any claim of damage or loss which arises out of the Contractor’s negligent or wrongful performance under the work order attached hereto, except for claims, losses, or damages resulting from the sole and exclusive negligence or other wrongful conduct of Ukiah or its officers, agents and employees.

CONTRACTOR
BY: _______________________________________________
TITLE: _______________________________________________

Page 454 of 1198 ends

THICKENING AND DEWATERING IMPROVEMENTS 50 Spec No. 23-02

CITY OF UKIAH
Mendocino County, California

PERFORMANCE BOND
BOND No._____________________
KNOW ALL PERSONS BY THESE PRESENTS:

THAT WHEREAS, the City of Ukiah, organized and operating under the laws of the State of California, (hereinafter referred to as the “City”) has awarded to ______________________________, (hereinafter referred to as the “Contractor”) an agreement for Contract No. _______________ (hereinafter referred to as the “Project”).

WHEREAS, the work to be performed by the Contractor is more particularly set forth in the Contract for the Project dated _______________________, (hereinafter referred to, together with all attachments and exhibits thereto, as “Contract Documents”), the terms and conditions of which are expressly incorporated herein by reference; and
WHEREAS, the Contractor is required by the Contract Documents to perform the terms thereof and to furnish a bond for the faithful performance of said Contract Documents.

NOW, THEREFORE, we, __________________________, the undersigned Contractor and _________________________, as Surety, a corporation organized and duly authorized to transact business under the laws of the State of California, are held firmly bound until the City in the sum of ______________________________ ($_________________), for which amount well and truly to be made, we bind ourselves, our heirs ,executors and administrators, successors and assigns, jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION IS SUCH that, if the Contractor, his or its heirs, executors, administrators, successors or assigns, shall in all things stand to and abide by, and well and truly keep and perform the covenants, conditions and agreements in the Contract Documents and any alteration thereof made as therein provided, on its part, to be kept and performed at the time and in the manner therein specified, and in all respects according to their intent and meaning; and shall faithfully fulfill all obligations; and shall indemnify and save harmless the City, its officials, officers, employees, and authorized volunteers, as stipulated in said Contract Documents, then this obligation shall become null and void; otherwise it shall be and remain in full force and effect.

As part of the obligation secured hereby and in addition to the face amount specified therefore, there shall be included costs and reasonable expenses and fees including reasonable attorneys’ fees, incurred by the City in enforcing such obligation.

As a condition precedent to the satisfactory completion of the Contract Documents, unless otherwise provided for in the Contract Documents, the above obligation shall hold good for a period of one (1) year after the acceptance of the work by the City, during which time if Contractor shall fail to make full, complete, and satisfactory repair and replacements and totally protect the City from loss or damage resulting from or caused by defective materials or faulty workmanship. The obligations of Surety hereunder shall continue so long as any obligation of Contractor remains. Nothing herein shall limit the City’s rights or the Contractor or Surety’s obligations under the Contract Documents, law or equity, including, but not limited to, California Code of Civil Procedure Section 337.15.

Page 455 of 1198 ends

THICKENING AND DEWATERING IMPROVEMENTS 51 Spec No. 23-02 Whenever Contractor shall be, and is declared by the City to be, in default under the Contract Documents, the Surety shall remedy the default pursuant to the Contract Documents, or shall promptly, at the City’s option:
i. Take over and complete the Project in accordance with all terms and conditions in the Contract Documents; or
ii. Obtain a bid or bids for completing the Project in accordance with all terms and conditions in the Contract Documents and upon determination by Surety of the lowest responsive and responsible bidder, arrange for a contract between such bidder, the Surety and the City, and make available as work progresses sufficient funds to pay the cost of completion of the Project, less the balance of the contract price, including other costs and damages for which Surety may be liable.

The term “balance of the contract price” as used in this paragraph shall mean the total amount payable to Contractor by the City under the Contract and any modification thereto, less any amount previously paid by the City to the Contractor and any other set offs pursuant to the Contract Documents.
iii. Permit the City to complete the Project in any manner consistent with California law and make available as work progresses sufficient funds to pay the cost of completion of the Project, less the balance of the contract price, including other costs and damages for which Surety may be liable. The term “balance of the contract price” as used in this paragraph shall mean the total amount payable to Contractor by the City under the Contract and any modification thereto, less any amount previously paid by the City to the Contractor and any other set offs by the City pursuant to the Contract Documents.

Surety expressly agrees that the City may reject any contractor or subcontractor which may be proposed by Surety in fulfillment of its obligations in the event of default by the Contractor.

Surety shall not utilize Contractor in completing the Project nor shall Surety accept a bid from Contractor for completion of the Project if the City, when declaring the Contractor in default, notifies Surety of the City’s objection to Contractor’s further participation in the completion of the Project.

The Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Contract Documents or to the Project to be performed thereunder shall in any way affect its obligation on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Contract Documents or to the Project. [REMAINDER OF PAGE LEFT INTENTIONALLY BLANK]

Page 456 of 1198 ends

THICKENING AND DEWATERING IMPROVEMENTS 52 Spec No. 23-02 IN WITNESS WHEREOF, we have hereunto set our hands and seals this ____ day of ___________, 20__. (Corporate Seal) ________________________________
Contractor/Principal
By______________________________
Title_____________________________
(Corporate Seal) _________________________________
Surety
By_______________________________
Attorney-in-Fact
(Attach Attorney-in Fact Certificate) Title______________________________ The rate of premium on this bond is __________________ per thousand. The total amount of premium charges is $_________________________.
(The above must be filled in by corporate attorney.)
THIS IS A REQUIRED FORM.

Any claims under this bond may be addressed to:
(Name and Address of Surety) ________________________________ ________________________________
________________________________
(Name and Address of Agent or ________________________________ Representative for service of process in ________________________________ California, if different from above) ________________________________ (Telephone number of Surety and Agent _______________________________ or Representative for service of process in California)

Page 457 of 1198 ends

THICKENING AND DEWATERING IMPROVEMENTS 53 Spec No. 23-02

CITY OF UKIAH
Mendocino County, California

PAYMENT BOND
BOND No. ____________________
KNOW ALL PERSONS BY THESE PRESENTS:

WHEREAS, the City of Ukiah (“City”) has awarded to _______________________ (“Contractor/Principal”) a contract (City Agreement No. _____________, dated _________________, ___________, referred to as the “Agreement”) for the work described as _______________________. The Agreement is incorporated by this reference into this Payment Bond (“Bond”); and
WHEREAS, Contractor/Principal is required to furnish a bond in connection with the Agreement and pursuant to California Civil Code section 9550;
NOW, THEREFORE, we ____________________________________________, the undersigned Contractor/Principal, and _____________________ (“Surety”), a corporation organized and existing under the laws of the State of _____________________, and duly authorized to transact business under the laws of the State of California, as Surety, are held firmly bound until the City, and to any and all persons, companies, or corporations entitled by law to file stop payment notices under California Civil Code Section 9100, or any person, company, or corporation entitled to make a claim on this bond, in the sum of $_________________________, for which payment will and truly be made, we bind ourselves, our heirs, executors and administrators, successors and assigns, jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION IS SUCH that if Contractor/Principal, its heirs, executors, administrators, successors, or assigns, or subcontractor, shall fail to pay any person or persons named in Civil Code section 9100; or fail to pay for any materials, provisions, or other supplies, used in, upon, for , or about the performance of the work contracted to be done, or for any work or labor thereon of any kind, or for amounts due under the Unemployment Insurance Code, with respect to work or labor thereon of any kind; or shall fail to deduct, withhold, and pay over to the Employment Development Department, any amounts required to be deducted, withheld, and paid over by Unemployment Insurance Code Section 13020 with respect to work and labor thereon of any kind, then Surety will pay for the same, in an amount not exceeding the amount herein above set forth, and in the event suit is brought upon this bond, also will pay such reasonable attorneys’ fees as shall be fixed by the court, awarded and taxed as provided in California Civil Code Section 9550, et seq.

It is further stipulated and agreed that the Surety of this bond shall not be exonerated or released from the obligation of the bond by any change, extension of time for performance, addition, alteration or modification in, to, or of any contract, plans, or specifications, or agreement pertaining or relating to any scheme or work of improvement herein above described; or pertaining or relating to the furnishing of labor, materials, or equipment therefor; nor by any change or modification of any terms of payment or extension of time for payment pertaining or relating to any scheme or work of improvement herein above described; nor by any rescissions or attempted rescission of the contract, agreement or bond; nor by any conditions precedent or subsequent in the bond attempting to limit the right of recovery of claimants otherwise entitled to recover under any such contract or agreement or under the bond; nor by any fraud practiced by any person other than the claimant seeking to recover on the bond; and that this bond be construed most strongly against the Surety and in favor of all persons for whose benefit such bond is give; and under no circumstances shall the Surety be released from liability to those for whose benefit such bond has been given, by reason of any breach of contract between the Owner and Contractor/Principal or on the part of any oblige named in such bond; that the sole condition of recovery shall be that the claimant is a person described in California Civil Code section 9100, and who has not been paid the full amount of his or her claim; and that the Surety does hereby waive notice of any such change, extension of time, addition, alteration or modification herein mentioned, including but not limited to the provisions of section 2819 and 2845 of the California Civil Code.

Page 458 of 1198 ends

THICKENING AND DEWATERING IMPROVEMENTS 54 Spec No. 23-02 Any notice to Surety may be given in the manner specified in the Agreement and delivered or transmitted to Surety as follows:

Attn:__________________________________________
Address:_______________________________________
City/State/Zip:___________________________________
Phone:_________________________________________
Fax:___________________________________________
Email:__________________________________________
IN WITNESS WHEREO, two identical counterparts of this Bond, each of which shall for all purposes be deemed an original thereof, have been duly executed by Contractor/Principal and Surety above named, on the __ day of ____________________, 202__.
__________________________________ (SEAL)
Contractor/Principal
By_____________________________________
Contractor’s Representative
______________________________________
Contractor/Principal’s Address
______________________________________
City, State, Zip
_________________________________(SEAL)
Surety
By_____________________________________
Surety’s Representative
______________________________________
Surety’s Address
______________________________________
City, State, Zip
______________________________________
Telephone Number
NOTE: Signatures of those executing for Surety must be properly acknowledged, the bond must be accompanied by a properly acknowledged Power of Attorney from the Surety authorizing its agent to bind it to this bond. A copy of such Power of Attorney must be in file with the City.

Page 459 of 1198 ends

THICKENING AND DEWATERING IMPROVEMENTS 55 Spec No. 23-02

DIRECTIONS FOR PREPARATION OF PERFORMANCE AND MATERIAL AND LABOR BOND

1. Individual sureties, partnerships, or corporations not in the surety business will not be acceptable.

2. The name of the Principal shall be shown exactly as it appears in the Contract.

3. The penal sum shall not be less than required by the Specifications.

4. If the Principals are partners or joint venturers, each member shall execute the bond as an individual and state his place of residence.

5. If the Principal is a corporation, the bond shall be executed under its corporate seal.

If the corporation has no corporate seal, it shall so state and affix a scroll or adhesive seal following the corporate name.

6. The official character and authority of the person(s) executing the bond for the Principal, if a corporation, shall be certified by the Secretary or Assistant Secretary thereof under the corporate seal, or copies attached to such records of the corporation as will evidence the official character and authority of the officer signing, duly certified by the Secretary or Assistant Secretary, under the corporate seal, to be true copies.

7. The current power-of-attorney of the person signing for the surety company must be attached to the bond.

8. The date of the bond must not be prior to the date of the Contract.

9. The following information must be placed on the bond by the surety company:
a. The rate of premium in dollars per thousand; and
b. The total dollar amount of premium charged.

10. The signature of a witness shall appear in the appropriate place attending to the signature of each party of the bond.

11. Type or print the name underneath each signature appearing on the bond.

12. An executed copy of the bond must be attached to each copy of the Contract (original counterpart) intended for signing.

Page 460 of 1198 ends

THICKENING AND DEWATERING IMPROVEMENTS 56 Spec No. 23-02

CITY OF UKIAH
Mendocino County, California

DEFECTIVE MATERIAL AND WORKMANSHIP (MAINTENANCE) BOND

KNOW ALL MEN BY THESE PRESENTS,
That we, _____________________________________________________________________ __________________________________________________________________, as PRINCIPAL and__________________________________________________________________________ ___________________________________________________________________, as SURETY, are held and firmly bound unto the City of Ukiah as Obligee, in the penal sum of ___________________________________________________________________________________ _________________________________________________________($____________________), (5 PERCENT OF THE FINAL CONTRACT AMOUNT)
to which payment well and truly to be made, we do bind ourselves, our and each of our heirs, executors, administrators’ successors and assigns jointly and severally, firmly by these presents.

WHEREAS, the said Principal entered into a Contract with the City of Ukiah dated________________ for
_________________________________________________________________________________ ____________________________________________________________________________________ WHEREAS, said Contract has been completed, and was approved on the ______ day of ___________, _________,
NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the Principal shall guarantee that the work will be free of any defective materials or workmanship which become apparent during the period of one (1) year following completion of the Contract, then this obligation shall be void, otherwise to remain in full force and effect, provided however, any additional warranty or guarantee whether expressed or implied is extended by the Principal or Manufacturer only, and the surety assumes no liability for such a guarantee.

Signed, sealed, and dated this __________ day of ____________, 20_____. __________________________________________________(Seal) BY:_______________________________________________(Seal) __________________________________________________(Seal) Principal
__________________________________________________(Seal) BY:_______________________________________________(Seal) __________________________________________________(Seal) Surety

Page 461 of 1198 ends

West Yost – March 2023 01110 - 1 City of Ukiah
592-50-22-14 Summary of Work Thickening and Dewatering
Improvements
SECTION 01110

SUMMARY OF WORK
PART 1 - GENERAL

1.01 SECTION INCLUDES
A. General description of the Project and the Work to be performed by the Contractor.

1.02 WORK COVERED BY CONTRACT
A. The Work covered under this Contract will be performed at the site of the City of Ukiah’s Water Pollution Control Facility, (300 Plant Road, Ukiah, CA 95482 The project location is indicated on the Drawings.

B. The Work to be performed by the Contractor generally includes:

1. Furnishing all labor, superintendence, materials, power, water, tools, equipment and services required by the Contract Documents or required to complete the Work.

2. Coordinate work of all trades.

3. Furnishing and installing miscellaneous items incidental to or necessary for completion of the Work, whether these items are specifically indicated in the Contract Documents or not.

C. The Work consists of the construction of the following items:

1. Demolition of existing equipment, piping and valves, concrete and various other items in the DAFT and Dewatering areas as shown on the drawings

2. Assembly and installation of a Suspended Air Flotation (SAF) System that was pre-purchased by the Owner

3. Furnishing and installing a container structure to house the Suspended Air Flotation Feed System

4. Furnishing and installation of two Polymer Systems in the existing DAFT Building

5. Installation of 8-inch diameter piping from the Plant Drain Pump Station to a connection point with the 8-inch Washwater Piping

6. Furnishing and installation of variable speed drives for the existing Washwater Pumps and Primary Scum Pumps

7. Assembly and installation of a Screw Press Dewatering and Polymer Blending System that was pre-purchased by the Owner

8. Construction of a concrete containment area for dewatered sludge cake

9. Furnishing and installing all mechanical, structural, electrical and instrumentation and controls associated with above items and as shown on the drawings D. Owner-Furnished Equipment:

1. Owner will furnish the following products to Contractor for installation:
a. Heron SAF Flocculation Tubes and Clearmixer (As shown in Appendix A) b. FKC Screw Press (As shown in Appendix B)

2. Work under this Contract includes all provisions necessary to fully incorporate Owner-furnished products, including piping, fasteners, supports, conduit and

Page 462 of 1198 ends

West Yost – March 2023 01110 - 2 City of Ukiah
592-50-22-14 Summary of Work Thickening and Dewatering
Improvements
conductors, coatings and other provisions necessary for a complete and operational installation.

1.03 OTHER CONTRACTS
A. The Owner will be undertaking other projects including the Phase 4 Recycled Water Project at the plant site simultaneously with the Work to be completed under this project.

Coordination with the contractors undertaking related work or un-related work within the plant is the responsibility of the Contractor.

1.04 SPECIFICATION LANGUAGE
A. Specifications may be written in the imperative mood in streamlined form in accordance with practices and principals of the Construction Specifications Institute.

B. Imperative language is directed to the Contractor unless specifically noted otherwise.

C. The words “shall be” are included by inference where a colon (:) is used within sentences or phrases.

1.05 REGULATORY REQUIREMENTS
A. Comply with all Federal, State, and local laws, regulations, codes, and ordinance applicable to the work.

B. References in the Contract Documents to local codes shall mean those of the City of Ukiah.

C. Other standards and codes that apply to the work are designated in the Specifications.

1.06 ACCESS BY GOVERNMENT OFFICIALS
A. Authorized representatives of governmental agencies shall have access to the work area at all times. Provide proper facilities for access and inspection.

1.07 PROTECTION OF PUBLIC AND PRIVATE PROPERTY
A. Construction will encounter numerous existing features of various types, such as curbs, asphalt pavement, utility poles, guy wires and other surface structures. Contractor shall protect existing features of this nature and all features affected by construction operations shall be restored to their original condition.

B. To the greatest extent possible, remove existing features without damaging the materials and re-use the material to place back in the original condition. When existing features are damaged during removal, install new materials of similar type, appearance and function, at no additional cost to the Owner.

C. Contractor shall be responsible for all damage to streets, roads, driveways, highways, shoulders, ditches, embankments, culverts, bridges, and other public or private property, regardless of location or character, that may be caused by transporting equipment, materials, or workers to or from the work or any part or site thereof, whether by Contractor or Contractor’s subcontractors or suppliers.

D. Keep fire hydrants and water control valves free from obstruction and available for use at all times.

PART 2 - PRODUCTS (NOT USED)
PART 3 - EXECUTION (NOT USED)

END OF SECTION

Page 463 of 1198 ends

West Yost – March 2023 01140 - 1 City of Ukiah
592-50-22-14 Work Sequence and Constraints Thickening and Dewatering Improvements
SECTION 01140

WORK SEQUENCE AND CONSTRAINTS
PART 1 - GENERAL

1.01 SECTION INCLUDES
A. Schedule requirements, construction constraints, and a suggested Work sequence for specific elements of the Project.

1.02 REFERENCED SECTIONS
A. The following Section is reference in this Section

1. Section 01999 – Reference Forms

1.03 GENERAL SEQUENCING REQUIREMENTS
A. The sequencing requirements and construction constraints described are critical elements of the Work and are presented to underscore the importance of proper management, planning, scheduling, coordination, and execution of the Work.

B. Sequencing requirements and construction constraints have been defined in this Section for only certain structures, facilities, and elements of the Work. All work, whether or not addressed in this Section, shall be governed by applicable specified requirements. If additional shutdown constraints are necessary to allow implementation of Contractor’s construction procedures and schedule, the Engineer will establish such constraints.

C. Contractor’s Construction Schedule:

1. Clearly illustrate the proposed sequence of construction.

2. Conform to the sequencing requirements and limitations specified in this Section.

3. Modify or adapt the suggested sequencing as necessary to complete the project provided all environmental and service continuity requirements are met.

1.04 OPERATIONAL CONTINUITY
A. The City of Ukiah owns and operates wastewater collection and treatment facilities. The Work under this project will interface with these existing facilities.

B. The existing wastewater collection system and treatment plant continuously receives, conveys and treats wastewater. Do not interrupt functions necessary to maintain operation of these facilities except as approved by the Engineer through review of the Contractor’s Facility Outage Plan and as specified herein.

C. Coordinate the Work to minimize interference and interruption of the normal operation of the Owner’s existing facilities through proper planning and by making temporary connections.

D. Except for allowable out-of-service periods as specified, maintain operation of sanitary and storm sewers, service laterals, catch basins, manholes, and similar facilities.

1. Provide temporary pumps, piping, power, bulkheads, plugs, and other devices that are required to keep such facilities in operation when these must be temporarily taken out of service in order to conduct the Work.

2. Notify the Engineer in writing 3 days in advance of the time it is necessary to take utilities out of service.

Page 464 of 1198 ends

West Yost – March 2023 01140 - 2 City of Ukiah
592-50-22-14 Work Sequence and Constraints Thickening and Dewatering Improvements

3. Notify public agencies and utility companies when service to customers will be temporarily interrupted to perform the Work and coordinate shutdowns with these agencies.

1.05 PERMIT VIOLATIONS
A. The wastewater treatment facilities must continuously comply with the Owner’s National Pollutant Discharge Elimination System (NPDES) permit and Mutual Agreement and Order (MAO) requirements.

B. Construction of the Work under this Contract must be undertaken in compliance with the terms and conditions of various permits that the Owner has obtained for this project.

C. In the event NPDES permit [or MAO] violations or spills are caused or, in the Owner’s opinion, will be caused by the Contractor’s operations, the Owner shall be entitled to immediately employ others to stop the violations or potential spills without giving written notice to the Contractor. All costs incurred by the Owner to stop or prevent permit violations shall be paid by the Contractor.

D. Under no circumstances shall wastewater be discharged, bypassed or spilled to creeks, drainage ditches, or other waterways; storm drain systems; or the ground surface. In the event accidental discharge or bypassing is caused by the Contractor’s operations, the Owner shall immediately be entitled to employ others to stop the bypassing without giving written notice to the Contractor. All costs incurred by the Owner to stop or prevent the bypass shall be paid by the Contractor.

E. Penalties imposed on and costs incurred by the Owner as a result of violations caused by the actions of the Contractor, his employees, or subcontractors, shall be borne in full by the Contractor, including legal fees and other expenses to the Owner resulting directly or indirectly from Contractor’s actions.

1. Under the terms of the NPDES permit issued to the Owner, the Owner is liable for the following penalties:
a. NPDES Permit No. R1-2018-0035 - $10,000 per day for each violation

1.06 ACCESS
A. The existing facility where Contractor’s work is to be done will be occupied by the Owner throughout the construction period. Access to the site by the Owner’s personnel is required for daily operations, maintenance, and administration. Additionally, regular traffic into and out of the site is to be expected.

B. Contractor shall provide all necessary access to the Owner’s personnel as required to safely and efficiently operate/maintain the facilities. At all times during the Contract duration, the Contractor is to provide the Owner’s personnel and representatives safe and immediate access to all process control equipment.

C. Contractor shall provide for unimpeded access for all delivery vehicles transporting materials, chemicals and equipment to the facility for the Owner’s operations. Contractor shall coordinate the work to avoid interference with vehicular access to the existing plant site and normal operation of plant equipment and processes.

1.07 FACILITY OUTAGE PLAN
A. Prepare and submit a detailed Facility Outage Plan when removal of an existing facility from service is necessary to complete the Work.

B. Submit the Facility Outage Plan to the Engineer for review and approval at least 2 weeks prior to the scheduled outage. Develop the Facility Outage Plan to satisfy the Work Sequence restrictions and conditions specified in this Section. Do not proceed with any Work involving facility outages until the Outage Plan has been approved by the Engineer.

Page 465 of 1198 ends

West Yost – March 2023 01140 - 3 City of Ukiah
592-50-22-14 Work Sequence and Constraints Thickening and Dewatering Improvements
C. The Facility Outage Plan shall describe, as applicable, a listing of existing facilities that will be taken out of service, methods for preventing bypassing of other treatment units, the length of time required to complete the operation, and the necessary personnel and equipment which will be provided in order to successfully complete the operation.

D. A System Outage Request (SOR) form shall accompany each outage or bypass plan (See Section 01999). Coordinate the outage schedule with the overall construction schedule.

1.08 REMOVING EXISTING FACILITIES FROM SERVICE
A. Existing systems or individual equipment items shall be isolated, decommissioned, deenergized, or depressurized only by the Owner’s operations personnel. This work will be done in accordance with the Facility Outage Plan and schedule prepared by the Contractor.

B. The Contractor shall design and provide all necessary bulkheads, cofferdams, and support structures to allow isolation of work areas from tanks, pipes, and/or channels that are in service. Bulkheads, cofferdams, and support structures shall conform to applicable OSHA requirements.

C. The Contractor shall provide all necessary temporary pumps, piping, power, electrical wiring, controls, and labor during and subsequent to all shutdown activities as required.

Maintain adequate access to the plant facilities, utilities, and equipment during construction to allow continued operation and maintenance by Owner’s personnel to take place.

D. Prior to any shutdown or flow diversion, all materials, bypass pumps, fittings, supports, equipment and tools shall be on the site and all necessary skilled labor scheduled prior to starting any connection work.

E. If valves or gates need to be opened or closed, or mechanical equipment turned off or turned on, or similar operations performed to allow construction to proceed, this is to be performed by the Owner’s operations staff working in coordination with Contractor personnel. Valves and gates that may be used to isolate lines and facilities may not completely seal. Contractor shall allow for leakage in planning the Work. Contractor shall clean the work areas as required to perform the work.

PART 2 - PRODUCTS (NOT USED)
PART 3 - EXECUTION

3.01 WORK COORDINATION
A. Schedule and coordinate the overall Work and construction operations, including the work of subcontractors and the timely provision of products and supplies.

B. Perform Work in an orderly and logical sequence. Individual specification Sections may identify specific requirements that are related to Work sequence. These types of constraints are not repeated in this Section but shall be followed by the Contractor.

3.02 WORK CONSTRAINTS
A. Work Hours

1. Except as otherwise required for the safety or protection of persons and except as otherwise stated in the Contract Documents, Work may only be performed Monday through Friday during the hours of 7:00 am and 6:00 pm. Contractor will not perform Work on a Sunday or any legal holiday defined by the City of Ukiah without written consent from the Owner.

2. Legal holidays are defined as:
a. New Year’s Day on January 1.
b. Memorial Day on the last Monday in May.

Page 466 of 1198 ends

West Yost – March 2023 01140 - 4 City of Ukiah
592-50-22-14 Work Sequence and Constraints Thickening and Dewatering Improvements
c. Independence Day on July 4.
d. Labor Day on the first Monday in September.
e. Thanksgiving Day on the fourth Thursday in November. f. Christmas Day on December 25.
g. When a holiday falls on Sunday, the following Monday is recognized as the legal holiday. When a holiday falls on a Saturday, the preceding Friday is recognized as the legal holiday.

B. Contractor shall undertake the Work in compliance with the constraints defined in the following paragraphs:

1. The Owner’s ability to operate the treatment plant shall be maintained at all times, except as authorized in writing in accordance with a Facility Outage Plan and accompanying SOR.

2. The new 8-inch WW piping to the Plant Drain Pump Station must be installed before work on the DAFTs can begin.

3. At least one DAFT must always remain in operation. Work shall begin on DAFT 2 first. The second DAFT unit cannot be taken out of service until the SAF system for one DAFT is operational and accepted.

4. The temporary sludge dewatering system must be operational before the existing belt filter press can be demolished and the new screw press installed.

5. The Digester have a maximum of three days of storage.

6. The temporary sludge dewatering system must operate successfully for two days before demolition work on the existing belt filter press can began.

7. Continuous operation of the temporary dewatering system shall not begin on after 1:00 pm on a Thursday or a Friday, Saturday or Sunday.

8. Work in the DAFT and Dewatering areas can occur in parallel.

3.03 SUGGESTED WORK SEQUENCE
A. The following work sequence is one suggested means of constructing the project, and shall be followed in general unless another suitable method of completing the work is developed by the Contractor and approved by the Owner. This suggested work sequence is general in nature and does not include all work activities required by this Contract for completion of the work. The suggested work sequence shall be coordinated with the requirements of other specification Sections and the Drawings in order to complete the Work in a timely and satisfactory manner.

B. Suggested Work Sequence

1. Install SAF unit for DAFT 2
a. Install the new 8-inch WW piping to the Plant Drain System. b. Cap existing PSC pipe at grade to prevent flow to DAFT 2. Close valves to prevent Polymer, MS and WW flow to DAFT 2. Demolish saturation tank, air supply and nitrogen purge system for DAFT 2 and cap AFE and SA lines at grade. Cap PF line at DAFT 2 connection above grade. c. Demolish concrete slab above piping for DAFT 2 to the extent that the 8’x24’ container will fit as shown on 70-M-001. Keep DAFT 1 piping in service.
d. Connect from the existing PSC line to the new PSC pipe that feeds DAFT

2. When DAFT 1 is taken out of service later, temporary piping can be placed while proposed piping is constructed.

Page 467 of 1198 ends

West Yost – March 2023 01140 - 5 City of Ukiah
592-50-22-14 Work Sequence and Constraints Thickening and Dewatering Improvements
e. Connect from the existing POL line to the new POL pipe that feeds DAFT

2. When DAFT 1 is taken out of service later, temporary piping can be placed while proposed piping is constructed.
f. Construct new WW, MS, Polymer, and PSC lines for DAFT 2 and connect to existing with one two (2) hour shut down per pipe. PSC piping will require a temporary connection to the existing PSC piping to DAFT 1. All valving to remain closed.
g. Demolish remaining WW, MS and Polymer lines above grade and cap below grade.
h. Pour new concrete foundation next to the DAFT 2 structure. i. Install above ground equipment and piping including the SAF, Clearmixer, WW, MS, POL, and PSC lines.
j. Place the 8’x24’ Container with the frothing generation equipment and run froth piping upstream of the Clearmixer.
k. In the equipment building, remove the existing polymer system servicing DAFT 2 as shown on 70-D-006. Install the new polymer blending system to provide polymer to the new SAF unit.
l. Perform all testing required by manufacturer of SAF system. Once seven consecutive days of successful testing has been performed and approved, the SAF system for DAFT 2 shall be placed into operation.

2. Install SAF for DAFT 1
a. Close valves to prevent PSC, Polymer, MS and WW flow to DAFT 1.

Demolish saturation tank, air supply and nitrogen purge system for DAFT 1 and cap AFE and SA lines at grade. Cap PF line at DAFT 1 connection above grade.
b. Demolish concrete slab above piping for DAFT 1.
c. Construct new WW, MS, POL, PSC and Drain lines and connect to existing with one two (2) hour shut down per pipe. Connect PSC and POL line to DAFT 2, and remove temporary piping. All valving to remain closed. d. Demolish remaining WW, MS and Polymer lines above grade and cap below grade.
e. Pour new concrete foundation.
f. Install above ground equipment and piping including the SAF, Clearmixer, WW, MS, Polymer, and PSC lines.
g. In the equipment building, remove the existing polymer system servicing DAFT 1 as shown on 70-D-006. Install the new polymer blending system to provide polymer to the new SAF unit.
h. Perform all testing required by manufacturer of SAF system. Once seven consecutive days of successful testing has been performed and approved, the SAF system for DAFT 1 shall be placed into operation. i. Demolish remaining equipment in the DAFT area and equipment building, keep saturation pumps in service until the SAF system is accepted.

3. Install Screw Press in Dewatering Building
a. Set up a temporary dewatering site as shown on C001 and 75-D-001. b. Demolish existing Belt Filter Press.
c. Demolish existing polymer system. Keep the existing polymer tote stand to support one the new tote.
d. Construct Screw Press concrete pedestals and grating as shown on 75- S-002.
e. Install new Screw Press and polymer system.

Page 468 of 1198 ends

West Yost – March 2023 01140 - 6 City of Ukiah
592-50-22-14 Work Sequence and Constraints Thickening and Dewatering Improvements
f. Construct the dewatered solids containment wall as shown on 75-S-001. g. Perform all testing required by manufacturer of Screw Press system. Once seven consecutive days of successful testing has been performed and approved, the Screw Press shall be placed into operation. h. Decommission and remove the temporary dewatering equipment.

END OF SECTION

Page 469 of 1198 ends

West Yost – March 2023 01200 - 1 City of Ukiah
592-50-22-14 Measurement and Payment Thickening and Dewatering Improvements
SECTION 01200

MEASUREMENT AND PAYMENT
PART 1 - GENERAL

1.01 SECTION INCLUDES
A. Methods of measurement and payment for specific items of Work under this Contract.

Refer also to General Conditions for administrative aspects of payments by the Owner to the Contractor.

1.02 BID COMPONENTS AND PAYMENT
A. General

1. All Bid Items identified on the Bid Form will be “Lump Sum Work”. Contractor’s cost for “Lump Sum Work” shall cover all Work indicated by the Contract Documents.

Lump Sum Work will be paid for on a progress payment basis in accordance with the provisions of the General Conditions.

B. Summary

1. The Bid Amounts for each Bid Item will be used for comparative bid analysis. The Bid amounts will also form the basis of monthly progress payments. Each Lump Sum bid amount will undergo further breakdown as described later in this section.

Bid Item 2, WORKER PROTECTION AND SAFETY/SHORING, will also demonstrate the Contractor's compliance with the California Labor Code relating to the price for sheeting, shoring, and bracing of excavations. Bid items are not intended to be exclusive descriptions of work categories and the Contractor shall determine and include in its pricing all materials, labor, and equipment necessary to complete each Bid Item (work phase) as shown and specified.

C. Base Bid Item No. 1, Mobilization/Demobilization.

1. The lump sum bid for mobilization shall not exceed four percent (4%) of the total bid price. Mobilization shall include: the obtaining of insurance and bonds; moving onto the site of all equipment; submittal and approval of initial project schedule; obtaining and paying for all permits by other agencies as applicable; furnishing temporary construction utilities (temporary power, toilets, water, fences, etc.); installing construction signs; temporary buildings and field office trailer(s); and other construction all as required for the proper performance and completion of the work.

2. The lump sum bid for demobilization shall not be less than two percent (2%) of the total bid price. Demobilization shall include site cleaning and restoration of surfaces within the job site, post-construction meeting, removal of all temporary facilities and equipment from the work area, disconnection of the temporary construction utilities and turnover of project to the Owner.

3. In the event the Contractor writes in a Mobilization/Demobilization price greater than six percent (6%) on the Bid Schedule found in the BID FORM, the Owner will pay any excess with the final Progress Payment.

4. Contractor may apply for payment of mobilization on a percent complete basis as the items covered in the Mobilization are being completed.

5. Contractor may apply for payment of demobilization after the overall project substantial completion is achieved and the project begins to demobilize.

Page 470 of 1198 ends

West Yost – March 2023 01200 - 2 City of Ukiah
592-50-22-14 Measurement and Payment Thickening and Dewatering Improvements

6. The lump sum price shall be full compensation for the preparation and installation or submittal of these materials, and for all labor, equipment, tools and incidentals to complete this item.

D. Base Bid Item No. 2, Workers Protection and Safety/Shoring.

1. The lump sum amount for providing a detailed plan of worker safety and maintaining safety during construction, including conforming to the California Labor Code all applicable safety orders and permits. Contractor may apply for payment for this Bid Item on a percent complete basis as the items covered in Worker Protection and Safety/Shoring are being completed.

2. The lump sum price shall be full compensation for the preparation and installation or submittal of these materials, and for all labor, equipment, tools and incidentals to complete this item.

E. Base Bid Item No. 3, All Work at the Ukiah WWTP Site in Accordance with the Contract Documents for the SAF System (Area 70), with the Exception of Work Included Under Bid Items 1, 2, 4, and 5.

1. The lump sum amount for providing the total cost to complete all work at the Ukiah WWTP site for the SAF and Polymer Blending systems (Area 70) in accordance with the contract documents including civil/site work, 8-inch WW piping to the Plant Drain Pump Station, SAF Frothing Equipment container, demolition work, concrete work, piping and valving, light poles and all associated mechanical, electrical and instrumentation and control work.

2. The SAF equipment as shown in Appendix A is Owner provided and the Contractor shall assemble and install the equipment.

3. The lump sum price shall be full compensation for the preparation and installation or submittal of these materials, and for all labor, equipment, tools and incidentals to complete this item.

F. Base Bid Item No. 4, All Work at the Ukiah WWTP Site in Accordance with the Contract Documents for the Dewatering System (Area 75), with the Exception of Work Included Under Bid Items 1, 2, 3, and 5.

1. The lump sum amount for providing the total cost to complete all work at the Ukiah WWTP site for the Dewatering and Polymer Blending Systems (Area 75) in accordance with the contract documents including civil/site work, dewatered storage containment wall, piping and valving, demolition work, concrete work, and all associated mechanical, electrical and instrumentation and control work.

2. The Dewatering and Polymer Blending System as shown in Appendix B are Owner provide and the Contractor shall assemble and install the equipment.

3. The lump sum price shall be full compensation for the preparation and installation or submittal of these materials, and for all labor, equipment, tools and incidentals to complete this item.

G. Base Bid Item No. 5, All Work at the Ukiah WWTP Site in Accordance with the Contract Documents for providing a Temporary Dewatering System, with the Exception of Work Included Under Bid Items 1, 2, 3 and 4.

1. The lump sum amount for providing the total cost to complete all work at the Ukiah WWTP site for a temporary dewatering system (Area 75) in accordance with the contract documents. This unit price bid item shall be the cost per dry ton of biosolids removed from the Plant site and properly disposed. The unit price shall include all labor, materials, equipment and environmental permitting and monitoring necessary to legally extract, dewater, analyze, load, transport from the Plant, monitor, and beneficially reuse or dispose of wastewater biosolids.

Page 471 of 1198 ends

West Yost – March 2023 01200 - 3 City of Ukiah
592-50-22-14 Measurement and Payment Thickening and Dewatering Improvements

2. The lump sum price shall be full compensation for the preparation and installation or submittal of these materials, and for all labor, equipment, tools, temporary power, chemicals including polymer, containment, disposal and incidentals to complete this item.

1.03 SCHEDULE OF VALUES
A. Format: Identify each line item in the Schedule of Values with number and title of the major Specification sections. Submit typed schedule on 8½ x 11-inch paper; Contractor's standard form or media-driven printout will be considered on request.

B. At the pre-construction meeting, submit a preliminary Schedule of Values to the Owner’s Representative for review. The Contractor shall incorporate any review comments from the Owner’s Representative, and submit a final Schedule of Values at least 21 days prior to submitting the first Application for Payment.

C. The Schedule of Values shall assign a fair, reasonable and equitable dollar value for each activity on the Contractor's construction schedule. The Schedule of Values shall include anticipated progress payments for each item in the bid schedule through the final payment.

In addition, a detailed breakdown of lump sum prices shall be included in the Schedule of Values.

D. The Schedule of Values shall specifically indicate installed cost for materials and equipment for each bid and sub-bid item.

E. Each activity's assigned value shall consist of labor, equipment and materials cost and a prorata contribution to overhead and profit. Breakdown shall be so organized as to facilitate assessment of work and payment of subcontractors.

F. The sum of the assigned values shall equal the lump sum price of the activity.

G. If, in the opinion of the Owner’s Representative or Owner, the Schedule of Values is not balanced, the Contractor shall provide documentation substantiating the cost allocations of those activities believed to be unbalanced. Cost allocation will be considered unbalanced if an activity on the construction schedule has been assigned a disproportionate allocation of labor, direct, or overhead and profit costs which result in progress payment request(s) which would create a condition where insufficient funds are available to complete the unfinished work. Upon request by Owner, support values shall be given with data that will substantiate their accuracy. Upon Owner's request, the Contractor shall submit additional detailed cost information.

H. Upon acceptance of the Schedule of Values, it shall be used as a basis for processing all progress payment requests.

1.04 PROGRESS PAYMENT REQUESTS
A. Submit Progress Payment Requests during the course of the project in conformance with the General Condition.

B. Submittal of progress record drawings of the project will be required at 25%, 50%, 75%, and substantial completion of the project. These submittals shall accompany the progress payment request and will be a condition of processing payment requests.

PART 2 - PRODUCTS (NOT USED)
PART 3 - EXECUTION (NOT USED)

END OF SECTION

Page 472 of 1198 ends

West Yost – March 2023 01200 - 4 City of Ukiah
592-50-22-14 Measurement and Payment Thickening and Dewatering Improvements
(THIS PAGE LEFT BLANK INTENTIONALLY)

Page 473 of 1198 ends

West Yost – March 2023 01310 - 1 City of Ukiah
592-50-22-14 Project Meetings Thickening and Dewatering Improvements
SECTION 01310

PROJECT MEETINGS
PART 1 - GENERAL

1.01 SECTION INCLUDES
A. Requirements for calling for and conducting meetings for the Work.

1.02 REFERENCED SECTIONS
A. The following Section is referenced in this Section

1. Section 01320 – Construction Schedule

1.03 GENERAL
A. Project meetings and conferences are an important administration and communication requirement of all project participants. Meetings will be conducted throughout the course of the construction to address issues related to the Work, review and coordinate progress of the Work, and to discuss other matters of common interest to project participants.

B. Meeting and conference locations and qualified participants will be determined by the Engineer and the Contractor based on the meeting agenda topics.

1.04 PRECONSTRUCTION CONFERENCE
A. Prior to the start of construction, the Engineer will schedule a meeting of the Contractor, Owner, and their respective representatives. The general purpose of the meeting will be to establish working relationships, begin coordination of construction matters, discuss the Work, and to review the pertinent features of the Contract. The duration of the preconstruction conference will take approximately 4 hours.

B. The agenda for the meeting will cover at least the following items, a more detailed agenda will be distributed at the meeting:

1. Organization of the Contractor's forces and personnel, including subcontractors and materials suppliers.

2. Lines of authority and channels and procedures for communication.

3. Contractor’s construction schedule, including sequence of critical work.

4. Processing of shop drawings and other data that will be submitted to Owner for review.

5. Processing of change order requests and monthly applications for payment.

6. Procedures for quality control, housekeeping and related matters.

C. Contractor should be prepared to discuss the following topics:

1. Preliminary construction schedule and critical path.

2. Schedule of submittals and submittals needing short turn-around times.

3. Schedule of Values for construction payments.

4. Critical work sequencing.

5. Plans for mobilization, arrangement and use of staging and storage areas, use of site, location and arrangement of field offices, and site security.

Page 474 of 1198 ends

West Yost – March 2023 01310 - 2 City of Ukiah
592-50-22-14 Project Meetings Thickening and Dewatering Improvements
D. Minutes of Meeting

1. The Engineer will compile minutes of the meeting and distribute copies to all participants.

1.05 PROGRESS MEETINGS
A. Unless otherwise arranged, there will be a weekly progress meeting at a time and at an on-site location that is mutually agreed upon between the Contractor, Engineer and Owner.

1. Meetings are to enable orderly project review during the progress of work.

2. Engineer, Owner, Contractor’s Superintendent, representatives of subcontractors, suppliers’ representatives as may be needed, other Contractors working at the site, and other parties shall attend these meetings.

3. Engineer will preside over the meeting and will compile and distribute minutes of the meeting.

B. The purpose of the weekly meetings is to coordinate the efforts of all concerned to result in smooth and coordinated progress towards completion of the overall project.

C. Contractor shall bring to each weekly meeting the updated 3-week “look ahead” schedule.

D. The Contractor will be required to address the following items at the weekly meeting:

1. Work completed last week.

2. Work anticipated next week.

3. Log of submittals and Requests for Information.

4. Contract document deficiencies or questions noted during prior week.

5. Schedule status and corrective measures and procedures that are planned to place the project back on schedule, if such action is necessary.

6. Report of any accidents, and any site safety issues that need to be addressed.

E. Other agenda items to be discussed include:

1. Review and revise as necessary and approve minutes of previous meetings.

2. Status of Requests for Information, Change Order Requests, submittals and shop drawings.

3. Identify problems that impede planned progress.

4. Other current business pertaining to the Work.

F. Revision of Minutes

1. Unless published minutes are challenged in writing prior to the next regularly scheduled progress meeting, they will be accepted as properly stating the activities and decisions of the meeting.

2. Persons challenging published minutes shall reproduce and distribute copies of the challenge to all indicated recipients of the particular set of minutes.

3. Challenge to minutes shall be settled as priority item of "old business" at the next regularly scheduled meeting.

1.06 PROGRESS SCHEDULE AND PROGRESS BILLING MEETINGS
A. Once each month, a progress schedule and progress payment meeting will be conducted with the Engineer. The purpose of this meeting is to review the Progress Payment Estimate and reach agreement on the extent of the Work completed during the pay period.

Page 475 of 1198 ends

West Yost – March 2023 01310 - 3 City of Ukiah
592-50-22-14 Project Meetings Thickening and Dewatering Improvements
B. The meeting date will be scheduled in accordance with the Owner’s deadline for submittal of Progress Pay Estimate.

C. The updated progress schedule will also be reviewed at this meeting as described in Section 01320. Schedule impacts, time extension requests, actual and anticipated schedule activity sequence/duration changes, delays, and other schedule-related topics will be discussed.

D. The Engineer may require more frequent progress schedule meetings should there be schedule revisions that necessitate such a meeting.

1.07 SUBMITTAL MEETINGS
A. When required in the individual technical specification, or if requested by the Contractor or the Engineer, a meeting regarding a required submittal will be held to facilitate the timeliness of the submittal preparation and review process.

1.08 QUALITY ASSURANCE MEETINGS
A. The Contractor or the Engineer may request a meeting prior to the start of a particular phase of the project to discuss how the Work shall be accomplished in accordance with the quality requirements of the Contract Documents, Codes, permits and industry standards. Quality assurance inspections and tests that are applicable to the Work will be discussed.

1.09 PRE-INSTALLATION MEETINGS
A. When required in the individual specification, or if requested by the Contractor or Engineer, a pre-installation meeting will be held to review conditions of the installation, installation procedures, and coordination with related work. This meeting will be scheduled to take place in advance of installation of the equipment or as required in the technical specifications.

1.10 PRE-SUBSTANTIAL COMPLETION MEETING
A. Thirty (30) days prior to the estimated substantial completion, the Owner, Engineer, Contractor, and appropriate subcontractors will meet to review maintenance manuals, guarantees, closeout submittals, bonds, and service contracts for materials and equipment.

1.11 SPECIAL MEETINGS
A. Any time during progress of the Work, the Owner and the Construction Manager shall have the authority to require the Contractor and any subcontractor, suppliers, or service providers to attend job-site conferences on matters which require immediate or special attention. Any notice of such conference shall be duly observed and complied with by the Contractor and subcontractors, suppliers, or service providers without extra cost to Owner.

1.12 POST CONSTRUCTION GUARANTY PERIOD MEETING
A. Contractor shall meet with a representative of the Owner and the Engineer approximately eleven (11) months after the date of Substantial Completion to inspect the Work. Meeting will be arranged by the Owner at least seven (7) days before meeting. The Contractor will require attendance of its Project Manager/Superintendent, appropriate manufactures and appropriate subcontractors.

Page 476 of 1198 ends