ATTACHMENT 1
Agenda Item No: 8.e.
MEETING DATE/TIME: 1/17/2024
ITEM NO: 2024-24
AGENDA SUMMARY REPORT
SUBJECT: Approval of a Budget Amendment in the Amount of $53,465.75 for Soil Sampling Services Related to the Recycled Water Project.
DEPARTMENT: Public Works PREPARED BY: Seth Strader, Administrative Analyst PRESENTER: Tim Eriksen, Director of Public Works
ATTACHMENTS:
1. Pace Invoices
2. McCampbell
Summary: Council will consider approving a budget amendment for Soil Sampling services at the Wastewater Treatment Plant.
Background: New recycled water ponds were dug at the Wastewater Treatment Plant as part of Phase 4 of the Recycled Water Project. As the contractor dug and formed these ponds, the excess dirt had to be transported off site. Before the dirt could be received at any landfills, the soil had to be sampled and tested.
Discussion: The various landfills that accepted material had varying sampling requirements and samples had to be retaken as the excavation of these sites continued. Please see Attachments 1 and 2 for copies of the invoices received as part of the required sampling by Pace Analytical and McCampbell Analytical. These costs totaled $53,465.75 which will be reimbursed as part of the state-issued grant.
Recommended Action: Approve a budget amendment in the amount of $53,465.75 for soil sampling related to the Recycled Water Project Phase 4.
BUDGET AMENDMENT REQUIRED: YES
CURRENT BUDGET AMOUNT: 83027330.80230.18052: $0
PROPOSED BUDGET AMOUNT: 83027330.80230.18052: $53,465.75 FINANCING SOURCE: Recycled Water SRF Grant
PREVIOUS CONTRACT/PURCHASE ORDER NO.:
COORDINATED WITH: Ryan Kriken, Wastewater Treatment Plant Supervisor and Tim Eriksen, Director of Public Works
DIVERSITY-EQUITY INITIATIVES (DEI):
CLIMATE INITIATIVES (CI): 7a – Expand sustainable water practices.
GENERAL PLAN ELEMENTS (GP): GP-A4 - Public Facilities, Services, and Infrastructure Element
Invoice No.: B486122
Invoice
Invoice Date: 10/30/2023
PO Number:
Terms: Net 30 days
Payment Due: 11/29/2023
Attn: Tyler Anderson
City of Ukiah
300 Seminary Ave
Ukiah, CA 95482
Lab Number:
Submitted On:
Submitted By:
Client ID: 27-102051/CIOUK
Quantity Description of Service Dept. Unit Amount
2320214
10/21/23
Client
2320214 Pace Project Name: COU-PAU
Client Project Name: [none]
2320214-01 COU-PAU-20231020-11, 10/20/2023 8:29:00 AM, Alejandro Vargas
2320214-02 COU-PAU-20231020-12, 10/20/2023 8:33:00 AM, Alejandro Vargas
2320214-03 COU-PAU-20231020-13, 10/20/2023 8:36:00 AM, Alejandro Vargas
2320214-04 COU-PAU-20231020-14, 10/20/2023 8:23:00 AM, Alejandro Vargas
2320214-05 COU-PAU-20231020-15, 10/20/2023 8:19:00 AM, Alejandro Vargas
5 Solids: SM 9221B/E - Total and Fecal Coliform (Mult Dils) - (Samples 2320214-01 to 05)
27-170 $65.00 $325.00
5 Solids: SM 9221B/E - Total and Fecal Coliform (Mult Dils) - (Samples 2320214-01 to 05)
[150% surcharge for 5-day TAT]
27-170 $97.50 $487.50
Subtotal $812.50
1.00 Environmental Impact Fee $25.00 $25.00
33.00 Sample Disposal Fee $6.00 $198.00
Please Pay This Amount $1,035.50
Please Remit To: Pace Analytical Services LLC, P.O. Box 684056 Chicago, IL 60695-4056 Ph (661)-327-4911 Accounts past due may be charged a 1.5% service fee per month until paid in full.
Printed 11/1/2023 10:33:47AM Please refer to the invoice number above when making your payment Page 1 of 1 ATTACHMENT 1
Invoice No.: B485711
Invoice
Invoice Date: 10/24/2023
PO Number:
Terms: Net 30 days
Payment Due: 11/27/2023
Attn: Tyler Anderson
City of Ukiah
300 Seminary Ave
Ukiah, CA 95482
Lab Number:
Submitted On:
Submitted By:
Client ID: 27-102051/CIOUK
Quantity Description of Service Dept. Unit Amount
2319728
10/14/23
Client
2319728 Pace Project Name: COU-PAU
Client Project Name: [none]
2319728-01 COU-PAU-20231013-06, 10/13/2023 1:08:00 PM, Client 2319728-02 COU-PAU-20231013-07, 10/13/2023 1:05:00 PM, Client 2319728-03 COU-PAU-20231013-08, 10/13/2023 12:54:00 PM, Client 2319728-04 COU-PAU-20231013-09, 10/13/2023 12:51:00 PM, Client 2319728-05 COU-PAU-20231013-10, 10/13/2023 1:13:00 PM, Client 5 Solids: SM 9221B/E - Total and Fecal Coliform (Mult Dils) - (Samples 2319728-01 to 05)
27-170 $65.00 $325.00
5 Solids: SM 9221B/E - Total and Fecal Coliform (Mult Dils) - (Samples 2319728-01 to 05)
[250% surcharge for 2-day TAT]
27-170 $162.50 $812.50
Subtotal $1,137.50
1.00 Environmental Impact Fee $25.00 $25.00
5.00 Sample Disposal Fee $6.00 $30.00
Please Pay This Amount $1,192.50
Please Remit To: Pace Analytical Services LLC, P.O. Box 684056 Chicago, IL 60695-4056 Ph (661)-327-4911 Accounts past due may be charged a 1.5% service fee per month until paid in full.
Printed 10/26/2023 9:58:55AM Please refer to the invoice number above when making your payment Page 1 of 1
Invoice No.: B485712
Invoice
Invoice Date: 10/24/2023
PO Number:
Terms: Net 30 days
Payment Due: 11/27/2023
Attn: Tyler Anderson
City of Ukiah
300 Seminary Ave
Ukiah, CA 95482
Lab Number:
Submitted On:
Submitted By:
Client ID: 27-102051/CIOUK
Quantity Description of Service Dept. Unit Amount
2319729
10/14/23
Client
2319729 Pace Project Name: COU-PAU
Client Project Name: [none]
2319729-01 COU-PAU-20231013-11, 10/13/2023 1:04:00 PM, Client 2319729-02 COU-PAU-20231013-12, 10/13/2023 1:00:00 PM, Client 2319729-03 COU-PAU-20231013-13, 10/13/2023 12:57:00 PM, Client 2319729-04 COU-PAU-20231013-14, 10/13/2023 12:55:00 PM, Client 2319729-05 COU-PAU-20231013-15, 10/13/2023 12:51:00 PM, Client 5 Solids: SM 9221B/E - Total and Fecal Coliform (Mult Dils) - (Samples 2319729-01 to 05)
27-170 $65.00 $325.00
5 Solids: SM 9221B/E - Total and Fecal Coliform (Mult Dils) - (Samples 2319729-01 to 05)
[250% surcharge for 2-day TAT]
27-170 $162.50 $812.50
Subtotal $1,137.50
1.00 Environmental Impact Fee $25.00 $25.00
5.00 Sample Disposal Fee $6.00 $30.00
Please Pay This Amount $1,192.50
Please Remit To: Pace Analytical Services LLC, P.O. Box 684056 Chicago, IL 60695-4056 Ph (661)-327-4911 Accounts past due may be charged a 1.5% service fee per month until paid in full.
Printed 10/26/2023 9:58:58AM Please refer to the invoice number above when making your payment Page 1 of 1
Invoice No.: B486123
Invoice
Invoice Date: 10/30/2023
PO Number:
Terms: Net 30 days
Payment Due: 11/29/2023
Attn: Tyler Anderson
City of Ukiah
300 Seminary Ave
Ukiah, CA 95482
Lab Number:
Submitted On:
Submitted By:
Client ID: 27-102051/CIOUK
Quantity Description of Service Dept. Unit Amount
2320215
10/21/23
Client
2320215 Pace Project Name: COU-PAU
Client Project Name: [none]
2320215-01 COU-PAU-20231020-06, 10/20/2023 8:39:00 AM, Tyler Anderson
2320215-02 COU-PAU-20231020-07, 10/20/2023 8:35:00 AM, Tyler Anderson
2320215-03 COU-PAU-20231020-08, 10/20/2023 8:24:00 AM, Tyler Anderson
2320215-04 COU-PAU-20231020-09, 10/20/2023 8:20:00 AM, Tyler Anderson
2320215-05 COU-PAU-20231020-10, 10/20/2023 8:32:00 AM, Tyler Anderson
5 Solids: SM 9221B/E - Total and Fecal Coliform (Mult Dils) - (Samples 2320215-01 to 05)
27-170 $65.00 $325.00
5 Solids: SM 9221B/E - Total and Fecal Coliform (Mult Dils) - (Samples 2320215-01 to 05)
[150% surcharge for 5-day TAT]
27-170 $97.50 $487.50
Subtotal $812.50
1.00 Environmental Impact Fee $25.00 $25.00
33.00 Sample Disposal Fee $6.00 $198.00
Please Pay This Amount $1,035.50
Please Remit To: Pace Analytical Services LLC, P.O. Box 684056 Chicago, IL 60695-4056 Ph (661)-327-4911 Accounts past due may be charged a 1.5% service fee per month until paid in full.
Printed 11/1/2023 10:33:49AM Please refer to the invoice number above when making your payment Page 1 of 1
Invoice No.: B486124
Invoice
Invoice Date: 10/30/2023
PO Number:
Terms: Net 30 days
Payment Due: 11/29/2023
Attn: Tyler Anderson
City of Ukiah
300 Seminary Ave
Ukiah, CA 95482
Lab Number:
Submitted On:
Submitted By:
Client ID: 27-102051/CIOUK
Quantity Description of Service Dept. Unit Amount
2320216
10/21/23
Client
2320216 Pace Project Name: COU-PAU
Client Project Name: [none]
2320216-01 COU-PAU-20231020-01, 10/20/2023 8:45:00 AM, Don Tubbs 2320216-02 COU-PAU-20231020-02, 10/20/2023 8:38:00 AM, Don Tubbs 2320216-03 COU-PAU-20231020-03, 10/20/2023 8:22:00 AM, Don Tubbs 2320216-04 COU-PAU-20231020-04, 10/20/2023 8:27:00 AM, Don Tubbs 2320216-05 COU-PAU-20231020-05, 10/20/2023 8:32:00 AM, Don Tubbs 5 Solids: SM 9221B/E - Total and Fecal Coliform (Mult Dils) - (Samples 2320216-01 to 05)
27-170 $65.00 $325.00
5 Solids: SM 9221B/E - Total and Fecal Coliform (Mult Dils) - (Samples 2320216-01 to 05)
[150% surcharge for 5-day TAT]
27-170 $97.50 $487.50
Subtotal $812.50
1.00 Environmental Impact Fee $25.00 $25.00
33.00 Sample Disposal Fee $6.00 $198.00
Please Pay This Amount $1,035.50
Please Remit To: Pace Analytical Services LLC, P.O. Box 684056 Chicago, IL 60695-4056 Ph (661)-327-4911 Accounts past due may be charged a 1.5% service fee per month until paid in full.
Printed 11/1/2023 10:33:51AM Please refer to the invoice number above when making your payment Page 1 of 1
Invoice No.: B485675
Invoice
Invoice Date: 10/24/2023
PO Number:
Terms: Net 30 days
Payment Due: 11/27/2023
Attn: Tyler Anderson
City of Ukiah
300 Seminary Ave
Ukiah, CA 95482
Lab Number:
Submitted On:
Submitted By:
Client ID: 27-102051/CIOUK
Quantity Description of Service Dept. Unit Amount
2319727
10/14/23
Client
2319727 Pace Project Name: COU-PAU
Client Project Name: [none]
2319727-01 COU-PAU-20231013-01, 10/13/2023 12:55:00 PM, Client 2319727-02 COU-PAU-20231013-02, 10/13/2023 12:57:00 PM, Client 2319727-03 COU-PAU-20231013-03, 10/13/2023 12:58:00 PM, Client 2319727-04 COU-PAU-20231013-04, 10/13/2023 1:01:00 PM, Client 2319727-05 COU-PAU-20231013-05, 10/13/2023 1:02:00 PM, Client 5 Solids: SM 9221B/E - Total and Fecal Coliform (Mult Dils) - (Samples 2319727-01 to 05)
27-170 $65.00 $325.00
5 Solids: SM 9221B/E - Total and Fecal Coliform (Mult Dils) - (Samples 2319727-01 to 05)
[250% surcharge for 2-day TAT]
27-170 $162.50 $812.50
Subtotal $1,137.50
1.00 Environmental Impact Fee $25.00 $25.00
5.00 Sample Disposal Fee $6.00 $30.00
Please Pay This Amount $1,192.50
Please Remit To: Pace Analytical Services LLC, P.O. Box 684056 Chicago, IL 60695-4056 Ph (661)-327-4911 Accounts past due may be charged a 1.5% service fee per month until paid in full.
Printed 10/26/2023 9:57:45AM Please refer to the invoice number above when making your payment Page 1 of 1
Attachment 2
Agenda Item No: 8.f.
MEETING DATE/TIME: 1/17/2024
ITEM NO: 2024-25
AGENDA SUMMARY REPORT
SUBJECT: Approval of a Budget Amendment in the Amount of $3,313,791 for Additional Construction Services from Ghilotti Construction Inc Related to the Recycled Water Project Phase 4.
DEPARTMENT: Public Works PREPARED BY: Seth Strader, Administrative Analyst PRESENTER: Tim Eriksen, Director of Public Works
ATTACHMENTS:
1. Plans
2. CO 2 CCO
Summary: Council will consider approving a budget amendment for additional construction services related to the Recycled Water Project Phase 4.
Background: The City Council approved the plans and specifications (Attachment 1) for Phase 4 of the Recycled Water Project on March 1, 2023. The project was then bid for, and the project awarded to Ghilotti Construction Inc. The project began construction in September and was primarily focused on the Water and Wastewater Treatment Plants. Since then, Ghilotti Construction has begun work in the City proper, starting on Low Gap Road.
Discussion: As work progressed on Low Gap Road, City Staff coordinated with Ghilotti Construction in developing a contract change order for recycled water pipeline realignment. This realignment is to deconflict existing utilities by adjusting sanitary sewer connections, water main, removal of old lines and additional sewer manholes for maintenance. The change order also includes street reconstruction between Bush Street and State Street which will provide a smooth surface after all the utility work and new ADA-compliant curb ramps as required. As part of this street reconstruction, complete street elements will be included, such as the narrowing of lane widths, larger bike buffers and enhanced striping.
Please see Attachment 2 for a copy of this change order.
The total cost of all the work is $3,313,791 and will be split between three funding sources. $709,082 will be reimbursed through the Recycled Water Grant, $1,183,834 will be paid from Street Bonds and the remaining $1,420,875 through Water Bonds.
Recommended Action: Approve a budget amendment in the amount of $3,313,791.00 for the additional construction services from Ghilotti Construction Inc related to the Recycled Water Project Phase 4.
BUDGET AMENDMENT REQUIRED: YES
CURRENT BUDGET AMOUNT: 830273330.80230.18052: $0 25224220.80230.18052: $0 82127113.80230.18052:$0
PROPOSED BUDGET AMOUNT: 830273330.80230.18052: $709,082 25224220.80230.18052: $1,183,834 82127113.80230.18052:$1,420,875
FINANCING SOURCE: Recycled Water Grant, Lease Revenue Bonds PREVIOUS CONTRACT/PURCHASE ORDER NO.:
COORDINATED WITH: Jason Benson, Senior Engineer, Mary Horger, Financial Services Manager and Tim Eriksen, Director of Public Works
DIVERSITY-EQUITY INITIATIVES (DEI): Goal 5 – Instill diversity, equity, and inclusion as essential core elements of policy-making, accountability, and delivery of City services.
CLIMATE INITIATIVES (CI): 7a – Expand sustainable water practices.
GENERAL PLAN ELEMENTS (GP):GP-A3 - Mobility Element; GP-A6 - Safety Element
DISTRIBUTION SYSTEM
PHASE 4 RECYCLED WATER
PROJECT LOCATION
1 116
116
o101
o101
o101
o101
29 29
128
12 12
1 1
1 20
128
20 20
20 128
128
29 29
53 175
175 175
29 29
CLEAR
LAKE
LAKE
SONOMA
ROSA
SANTA
SEBASTOPOL
HEALDSBURG
ST. HELENA
KENWOOD
YOUNTVILLE
CALISTOGA
GUERNEVILLE
CLOVERDALE
LAKEPORT
CLEARLAKE
UKIAH
WILLITS
MENDOCINO
FT. BRAGG
P
lotD
ate: 07-APR
-2023
9:18:23
AM
U
ser:svcPW
Model:
Layout1 C
olorTable:gshade.ctb
D
esignS
cript:
C
arollo_S
td_P
en_v0905.pen
P
lotScale:1:1
®
DRAWING NO.
JOB NO.
SHEET NO.
1 00G01
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G
LOCATION MAP
NO SCALE
VICINITY MAP
NO SCALE
CITY OF UKIAH
RECYCLED WATER PROJECT
PHASE 4 - SPECIFICATION NO. 23-01
100% SUBMITTAL
8660F10
UKIAH, CA 95482
935 RIVER STREET,
LOCATION:
WATER TREATMENT PLANT
UKIAH, CA 95482
300 PLANT ROAD
PLANT LOCATION:
WASTEWATER TREATMENT
VOLUME 3 OF 3
No. 76832
PROJECT NO. 8660F10 FILE NAME: 8660F1000G01.dgn
APRIL 2023
JG
arretty
OF 200
Digitally signed by Brian W. Avon
Contact Info: Carollo Engineers, Inc.
Date: 2023.04.10 09:18:14-07'00'
ATTACHMENT 1
REV DATE BY DESCRIPTION
DATE
CHECKED
DRAWN
DESIGNED
8660F.10
JOB NO.
DRAWING NO.
SHEET NO.
SCALES ACCORDINGLY
VERIFY SCALES
THIS SHEET, ADJUST
IF NOT ONE INCH ON
BAR IS ONE INCH ON
ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200
CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 76832
P
lotD
ate: 07-APR
-2023
9:18:34
AM
U
ser:svcPW
Model:
Layout1 C
olorTable:gshade.ctb
D
esignS
cript:
C
arollo_S
td_P
en_v0905.pen
P
lotScale:1:1 LA
S
T
SAVED
B
Y:
PROJECT NO. FILE NAME:
JG
arretty
2 GENERAL
00G02
DRAWING INDEX
NO.
SHEET
NO.
DRAWING
DESCRIPTION
8660F10
CE
CE
8660F1000G02.dgn
NO. DESCRIPTION
DRAWING
NO.
SHEET
NO. DESCRIPTION
DRAWING
NO.
SHEET
CA
GENERAL
1 00G01 COVER SHEET, VICINITY AND LOCATION MAP
2 00G02 DRAWING INDEX
3 00G03 GENERAL NOTES, LEGEND, AND SYMBOLS
4 00G04 GENERAL ABBREVIATIONS
5 00G05 KEY MAP AND SURVEY CONTROL
6 00G06 RECYCLED WATER SERVICE SCHEDULE
7 00G07 DESIGN CRITERIA, PIPE SERVICE ABBREVIATIONS AND PROCESS AREA NUMBERS 8 00G08 LIQUIDS PROCESS FLOW DIAGRAM
9 00G09 SITE PLAN
DEMOLITION
10 00D01 SITE PLAN
11 60D01 DECHLORINATION STRUCTURE PLAN
12 60D02 DECHLORINATION STRUCTURE PHOTOS
13 85D01 AWT CLARIFIER/FILTER PLAN
14 85D02 AWT CLARIFIER/FILTER SECTION AND PHOTOS
15 85D03 AWT CLARIFIER/FILTER PHOTOS
16 87D01 BACKWASH PUMP STATION PLAN AND PHOTOS
17 89D01 CAROUSEL PUMP STATION PLAN
18 89D02 CAROUSEL PUMP STATION PHOTOS
19 91D01 SLUDGE LAGOON PLAN
CIVIL
20 00C01 GENERAL CIVIL LEGEND, AND SYMBOLS
21 00C02 GENERAL CIVIL NOTES AND SCHEDULES
22 00C03 WWTP SITE PLAN
23 91C01 PAU GRADING PLAN
24 91C02 PAU SECTIONS
25 91C03 PAU DETAILS
26 91C04 PAU DETAILS
27 91C05 PAU SURVEY CONTROL PLAN
28 91C06 PAU PUMP STATION PLAN
29 91C07 PLAN AND PROFILE PAU INLET YARD PIPING
30 91C08 PLAN AND PROFILE PAU OUTLET YARD PIPING
31 99C01 PLAN AND PROFILE - ALIGNMENT A STA A9+40 TO A19+00 32 99C02 PLAN AND PROFILE - ALIGNMENT A STA A19+00 TO A29+00 33 99C03 PLAN AND PROFILE - ALIGNMENT A STA A29+00 TO A39+00 34 99C04 PLAN AND PROFILE - ALIGNMENT A STA A39+00 TO A49+00 35 99C05 PLAN AND PROFILE - ALIGNMENT A STA A49+00 TO A59+00 36 99C06 PLAN AND PROFILE - ALIGNMENT A STA A59+00 TO A69+00 37 99C07 PLAN AND PROFILE - ALIGNMENT A STA A69+00 TO A79+00 38 99C08 PLAN AND PROFILE - ALIGNMENT A STA A79+00 TO A89+00 39 99C09 PLAN AND PROFILE - ALIGNMENT A STA A89+00 TO A89+57.67 40 99C10 PLAN AND PROFILE - ALIGNMENT B STA B9+60 TO B19+00 41 99C11 PLAN AND PROFILE - ALIGNMENT B STA B19+00 TO B24.28.79 42 99C12 PLAN AND PROFILE - ALIGNMENT C STA C10+00 TO C19+00 43 99C13 PLAN AND PROFILE - ALIGNMENT C STA C19+00 TO C29+00 44 99C14 PLAN AND PROFILE - ALIGNMENT C STA C29+00 TO C39+00 45 99C15 PLAN AND PROFILE - ALIGNMENT C STA C39+00 TO C49+00 46 99C16 PLAN AND PROFILE - ALIGNMENT C STA C49+00 TO C59+00 47 99C17 PLAN AND PROFILE - ALIGNMENT C STA C59+00 TO C68+00 48 99C18 PLAN AND PROFILE - ALIGNMENT C STA C59+00 TO C70+49.19 49 99C19 PUMP STATION AND STORAGE SITE PLAN
50 99C20 PUMP STATION AND STORAGE GRADING AND DRAINAGE PLAN 51 99C21 PUMP STATION AND STORAGE GRADING DETAILS
52 99C22 SEWER REALIGNMENT
ARCHITECTURAL
53 99A01 ELECTRICAL BUILDING CODE ANALYSIS, SCHEDULES, AND EGRESS PLAN 54 99A02 ELECTRICAL BUILDING ROOF ELEVATIONS
STRUCTURAL
55 00S01 GENERAL STRUCTURAL NOTES
56 85S01 AWT CLARIFIER/FILTER PLAN
57 85S02 AWT CLARIFIER/FILTER SECTIONS AND PHOTO
58 91S01 PAU PUMP STATION PLANS
59 91S02 PAU PUMP STATION SECTIONS AND DETAILS
60 91S03 PAU PUMP STATION INLET STRUCTURE PLAN AND SECTIONS 61 95S01 PAU INLET STRUCTURE PLAN AND SECTION
62 99S01 ELECTRICAL BUILDING FOUNDATION PLAN
63 99S02 ELECTRICAL BUILDING ROOF FRAMING AND ROOF PLANS 64 99S03 ELECTRICAL BUILDING SECTION
65 99S04 RECYCLED WATER PUMP STATION PLAN AND SECTIONS
66 99S05 STORAGE TANK FOUNDATION PLAN
67 99S06 STORAGE TANK ROOF PLAN
68 99S07 STORAGE TANK SECTIONS AND DETAILS
69 99S08 STORAGE TANK SECTION AND DETAILS
70 99S09 BRIDGE PLAN AND SECTION
71 99S10 BRIDGE SECTIONS AND DETAILS
MECHANICAL
72 00M01 GENERAL MECHANICAL SYMBOLS
73 00M02 GENERAL HVAC NOTES, ABBREVIATIONS, AND SYMBOLS 74 60M01 DECHLORINATION STRUCTURE PLAN AND SECTION
75 85M01 AWT PROCESS FLOW SCHEMATIC
76 85M02 AWT CLARIFIER/FILTER PLAN
77 85M03 AWT CLARIFIER/FILTER SECTIONS
78 85M04 AIR WASH BLOWERS SECTIONS
79 85M05 COAGULANT FEED PUMP AND RAPID MIX PUMP PLAN, SECTION, AND DETAIL 80 87M01 BACKWASH PUMP STATION PLAN AND SECTION
81 89M01 CAROUSEL PUMP STATION PLAN AND SECTIONS
82 91M01 PAU PUMP STATION PLAN AND SECTION
83 99M01 RECYCLED WATER PUMP STATION PLAN, SECTION AND DETAIL 84 99M02 RECYCLED WATER PUMP STATION SECTION
85 99M03 METER AND CONTROL VALVE PLAN AND SECTION
86 99M04 ELECTRICAL BUILDING HVAC FLOOR PLAN AND SCHEDULE
ELECTRICAL
87 00GE01 LEGEND
88 00GE02 ABBREVIATIONS
89 01E01 RECYCLED WATER PUMP STATION AND STORAGE SITE PLAN 90 01E02 WWTP AND STORAGE POND PARTIAL SITE PLAN
91 01E03 WWTP AND STORAGE POND DETAILS AND SECTION
92 02E01 DUCT BANK SECTIONS 1
93 02E02 DUCT BANK SECTIONS 2
94 02E03 DUCT BANK SECTIONS 3
95 03E01 WTP MODIFIED OVERALL ONE-LINE DIAGRAM
96 03E02 SWBD-RWPS ELEVATION
97 03E03 SWBD-RWPS ONE-LINE DIAGRAM
98 03E04 WWTP MODIFIED OVERALL ONE-LINE DIAGRAM
99 03E05 CAROUSEL PUMP STATION DEMO ONE-LINE DIAGRAM
100 03E06 SWBD70281 AND SWBD70282 ONE-LINE DIAGRAM
101 03E09 MCC - C DEMO ELEVATION
102 03E10 MCC - C MODIFIED ELEVATION
103 03E11 MCC - C MODIFIED ONE-LINE DIAGRAM 1
104 03E12 MCC - C MODIFIED ONE-LINE DIAGRAM 2
105 03E18 MCC70291 PARTIAL ELEVATION
106 03E19 MCC70291 ONE-LINE DIAGRAM
107 03E20 MCC70292 PARTIAL ELEVATION
108 03E21 MCC70292 ONE-LINE DIAGRAM
109 03E22 MCC70293 PARTIAL ELEVATION
110 03E23 MCC70293 ONE-LINE DIAGRAM
111 04E01 PANELBOARD SCHEDULES 1
112 04E02 PANELBOARD SCHEDULES 2
113 05E01 LUMINAIRE, MANHOLE/HANDHOLE, AND DISCONNECT SCHEDULES 114 05E02 TITLE 24 COMPLIANCE SHEETS 1
115 05E03 TITLE 24 COMPLIANCE SHEETS 2
116 05E04 TITLE 24 COMPLIANCE SHEETS 3
117 12E01 POWER GENERATION BUILDING PARTIAL COMMUNICATION PLAN 118 60E01 DECHLORINATION STRUCTURE POWER, CONTROL, AND LIGHTING PLAN 119 70E01 DAFT EQUIPMENT BUILDING ELECTRICAL ROOM POWER, CONTROL, AND GROUNDING PLAN 120 80E01 STRUCTURE 80 PLAN
121 85E01 AWT BUILDING OVERALL PLAN
122 85E02 AWT BUILDING POWER AND CONTROL PLAN 1
123 85E03 AWT BUILDING POWER AND CONTROL PLAN 2
124 87E01 BACKWASH PUMP STATION POWER AND CONTROL PLAN
125 89E01 CAROUSEL PUMP STATION POWER AND CONTROL PLAN
126 89E02 CAROUSEL PUMP STATION LIGHTING, GROUNDING, AND RECEPTACLE PLAN 127 91E01 PAU PUMP STATION PLANS
128 99E01 EXISTING WATER TREATMENT BUILDING PARTIAL POWER AND CONTROL PLAN 129 99E02 RECYCLED WATER ELECTRICAL BLDG. POWER & CONTROL PLAN 130 99E03 RECYCLED WATER PUMP STATION BLDG. POWER & CONTROL PLAN 131 99E04 RECYCLED WATER STORAGE POWER & CONTROL PLAN
132 99E12 RECYCLED WATER ELECTRICAL BLDG. LIGHTING, GROUNDING, AND RECEPTACLES PLAN 133 99E13 RECYCLED WATER PUMP STATION LIGHTING, GROUNDING, AND RECEPTACLES PLAN 134 99E14 RECYCLED WATER STORAGE LIGHTING, GROUNDING, AND RECEPTACLES PLAN
INSTRUMENTATION
135 00GN01 SYMBOLS AND ABBREVIATIONS 1
136 00GN02 SYMBOLS AND ABBREVIATIONS 2
137 00GN03 SYMBOLS AND ABBREVIATIONS 3
138 00GN04 SYMBOLS AND ABBREVIATIONS 4
139 00GN05 SCHEMATIC SYMBOLS
140 00GN06 SAMPLE LOOP DRAWING
141 02N01 PCM-99400 ELEVATION LAYOUT
142 02N02 PCM-4 PANEL MODIFICATIONS
143 02N03 PLC-70299 PANEL MODIFICATIONS
144 04N01 RECYCLED WATER PUMP STATION NETWORK BLOCK DIAGRAM 145 04N02 ADVANCED WASTEWATER TREATMENT NETWORK BLOCK DIAGRAM 146 04N03 DAFT BUILDING NETWORK BLOCK DIAGRAM
147 06N01 CONTROL SCHEMATICS 1
148 06N02 CONTROL SCHEMATICS 2
149 06N03 CONTROL SCHEMATICS 3
150 06N04 CONTROL SCHEMATICS 4
151 06N05 CONTROL SCHEMATICS 5
152 06N06 CONTROL SCHEMATICS 6
153 09N01 PCS I/O TABLES
154 60N01 DECHLORINATION STRUCTURE P&ID
155 80N01 STRUCTURE 80 P&ID
156 85N01 AWT CLARIFIER/FILTER 1 P&ID
157 85N02 AWT CLARIFIER/FILTER 2 P&ID
158 85N03 AWT CLARIFIER/FILTER 3 P&ID
159 85N04 AWT CLARIFIER/FILTER 4 P&ID
160 85N05 AIR WASH BLOWERS 1, 2 & 3 P&ID
161 85N06 COAGULANT FEED PUMP P&ID
162 85N07 RAPID MIX PUMP P&ID
163 85N08 EXISTING CHLORINATION FACILITY ANALYZERS P&ID 164 87N01 BACKWASH PUMP STATION CHLORINE ANALYZER P&ID
165 88N01 CHLORINE CONTACT BASIN FLOW METERS P&ID
166 89N01 CAROUSEL PUMP & LEVEL CONTROLS P&ID
167 91N01 PAU PUMP STATION P&ID
168 99N01 RECYCLED WATER PUMP STATION 1 P&ID
169 99N02 RECYCLED WATER PUMP STATION 2 P&ID
170 99N03 RECYCLED WATER PUMP STATION 3 P&ID
171 99N04 RECYCLED WATER PUMP STATION PCM-99400 CABINET P&ID
TYPICAL DETAILS
172 00TA01 TYPICAL DETAILS - ARCHITECTURAL
173 00TA02 TYPICAL DETAILS - ARCHITECTURAL
174 00TC01 TYPICAL DETAILS - CIVIL
175 00TE01 TYPICAL DETAILS - ELECTRICAL
176 00TE02 TYPICAL DETAILS - ELECTRICAL
177 00TE03 TYPICAL DETAILS - ELECTRICAL
178 00TE04 TYPICAL DETAILS - ELECTRICAL
179 00TE05 TYPICAL DETAILS - ELECTRICAL
180 00TE06 TYPICAL DETAILS - ELECTRICAL
181 00TE07 TYPICAL DETAILS - ELECTRICAL
196 00TE08 TYPICAL DETAILS - ELECTRICAL
200 00TE09 TYPICAL DETAILS - ELECTRICAL
184 00TN01 TYPICAL DETAILS - INSTRUMENTATION
185 00TN02 TYPICAL DETAILS - INSTRUMENTATION
186 00TP01 TYPICAL DETAILS - PIPING
187 00TP02 TYPICAL DETAILS - PIPING
188 00TP03 TYPICAL DETAILS - PIPING
189 00TP04 TYPICAL DETAILS - PIPING
190 00TP05 TYPICAL DETAILS - PIPING
191 00TP06 TYPICAL DETAILS - PIPING
192 00TP07 TYPICAL DETAILS - PIPING
193 00TP08 TYPICAL DETAILS - PIPING
194 00TS01 TYPICAL DETAILS - STRUCTURAL
195 00TS02 TYPICAL DETAILS - STRUCTURAL
196 00TS03 TYPICAL DETAILS - STRUCTURAL
197 00TS04 TYPICAL DETAILS - STRUCTURAL
198 00TS05 TYPICAL DETAILS - STRUCTURAL
199 00TS06 TYPICAL DETAILS - STRUCTURAL
200 00TS07 TYPICAL DETAILS - STRUCTURAL
Digitally signed by Matthew C. Kallevant
Contact Info: Carollo Engineers, Inc.
Date: 2023.04.07 16:50:25-04'00'
30°
REV DATE BY DESCRIPTION
DATE
CHECKED
DRAWN
DESIGNED
8660F.10
JOB NO.
DRAWING NO.
SHEET NO.
SCALES ACCORDINGLY
VERIFY SCALES
THIS SHEET, ADJUST
IF NOT ONE INCH ON
BAR IS ONE INCH ON
ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200
CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 76832
P
lotD
ate: 07-APR
-2023 12:19:29
PM
U
ser:svcPW
Model:
Layout1 C
olorTable:gshade.ctb
D
esignS
cript:
C
arollo_S
td_P
en_v0905.pen
P
lotScale:1:1 LA
S
T
SAVED
B
Y:
PROJECT NO. FILE NAME:
JD
iDonato
CE
CE
3 GENERAL
GENERAL NOTES, LEGEND,
AND SYMBOLS
VIEW
REVISION DELTA
SCALE
FENCE
GUARDRAIL
CENTER LINE
REMOVE AND/OR ABANDON
GATE
NEW EXISTING
DETAIL REFERENCES HATCH PATTERNS
VIEW
DRAWING CUT ORIGINATION
TYPICAL DETAIL #
FILE:
SCALE:
FILE:
0 50' 100' 200'
SECTION CUT
REFERENCE
TYPICAL DETAIL
(EXIST)
VIEWS
EXTERIOR ELEVATION
PHOTO LOCATION
KEY NOTE
TAG AND NUMBER
EQUIPMENT/DEVICE
GRID BUBBLE A
PIPE TAG
BREAK LINE
TRUE
NO
R
TH
PLAN
T
NORTH
NORTH ARROW/PLANT NORTH
SPECIFIC)
(STATE/REGION
WARNING
OVERHEAD
UNDERGROUND/
SYMBOLS
GENERAL NOTES
MATCH LINE
HIDDEN LINE
MATCH LINE SEE DWG ##X##
ELEVATION
TOC XXXX.XX
EXISTING ELEVATION
PLAN VIEW
PIPE BREAK
CROSS SECTION
PIPE BREAK
CONSTRUCTION
FUTURE CONSTRUCTION
(SINGLE LINE)
PIPE CONTINUATION
BRACKET
EF-EQUIP = FUTURE EQUIPMENT
EX-EQUIP = EXISTING EQUIPMENT
EQUIPMENT
EF-SIZE FLOW STREAM = FUTURE
EX-SIZE FLOW STREAM = EXISTING
SIZE FLOW STREAM
POINT OF VIEW
ARROW INDICATES
1 ##X## = SEE INDICATED DRAWING
- = SHOWN ON SAME DRAWING
DRAWING REFERENCE ##X##
DISCIPLINE DESIGNATOR
DRAWING
SEE INDICATED
DETAIL
SHEETS IN
TYPICAL DETAIL NUMBER
TYPICAL DETAIL TITLE
(WHEN APPLICABLE)
AREA DESIGNATOR
(REVISED)
DATE CREATED
PLAN NOT REFERENCED
LINE WORK
N = NOTE TO TYPICAL DETAIL USER
R = REVISED
J = JOB SPECIFIC
S = STANDARD
MODIFICATION NOTE
T.O.W. XXXX.X±
PIPE SIZE FLOW STREAM
OVERHEAD
Call
before you
Avoid overhead power line
contact. It's costly.
Phone Number
Replace with Regional
XXX-XX-XXXX
X" XXX
34 2
#
##X##
1 MOD SHT # OF #
LINE 2
LINE 1
LINE 3
VER DATE
TYP
?
C/1
##X##
FILE
SCALE
C
A FILE
RUBBER
TREAD PLATE
LANDSCAPING
GRATING
STEEL
ALUMINUM
OR COPPER
BRONZE, BRASS,
BRICK OR BLOCK
COURSE (ABC)
AGGREGATE BASE
BEDROCK
FIBERGLASS
CAST IRON OR
CLSM
(ALL CLASSES)
CONCRETE
DRAIN ROCK
OR BACKFILL
STRUCTURAL FILL
WOOD
SPAN
ASPHALT PAVING
GRAVEL
UNDISTURBED SOIL
EXISTING/
Know what's below.
Callbefore you dig.
SAND OR GROUT
KEY TAG X
00G03
TYPICAL DETAIL SHEETS
INDICATES LOCATED ON
(TYP)
THE DRAWING
MULTIPLE LOCATIONS WITHIN
TYPICAL DETAIL IS USED IN
(TYP) - INDICATES THE
DESCRIPTION
SECTION/DETAIL
PLAN
SHEET NUMBER
DESCRIPTION
PLAN/VIEW TITLE
REFERENCE
VIEW TITLE W/
SECTION OR DETAIL
CALL OUT
ENLARGED PLAN
DETAIL OR
NUMERIC = DETAIL
ALPHA = SECTION
NUMERIC = DETAIL
ALPHA = ENLARGED PLAN
TYP
?
A
##X##
##X##
DRAWING
SEE INDICATED
DRAWING
SEE INDICATED
8660F1000G03.dgn
UTILITY NAME UTILITY TYPE CONTACT PERSON CONTACT NUMBER CITY OF UKIAH WATER, SEWER, STORMWATER, ELECTRIC JASON BENSON (707) 510-5485 COMCAST CABLE STEVE STEVENS (707) 462-1184
PG&E GAS, ELECTRIC DAVE KELLY (800) 743-5000 ext 00
PACIFIC BELL TELEPHONE CONSTRUCTION & ENGINEERING (510) 645-2929 LEVEL 3 COMMUNICATIONS FIBER NETWORK (877) 366-8344 ext 2 ROGINA WATER CO. WATER DAN ROGINA
707-462-4443
UKIAH VALLEY SANIT. DIST.
SEWER FRANK MCMICHAEL 707-462-4429
WILLOW COUNTY WATER DISTRICT WATER DAVE REDDING 707-462-2666 MILLVIEW COUNTY WATER DISTRIC WATER - 707-462-7229
AS NECESSARY
VIEW DESCRIPTION,
AS NECESSARY
VIEW DESCRIPTION,
8660F10
MCK
PERFORM CONSTRUCTION WORK WITHOUT DAMAGE TO EXISTING FACILITIES.
CONTRACTOR SHALL LOCATE THESE FACILITIES IN THE FIELD AND MAKE PROVISIONS AS NEEDED TO ALL EXISTING ELECTRIC UTILITY POLES AND OVERHEAD WIRES ARE SHOWN ON THE DRAWINGS. THE CONFLICT IS RESOLVED BY THE CONSTRUCTION MANAGER WITHIN 30 DAYS AFTER IT IS REPORTED. NOT IMMEDIATELY AFTER THEY ARE DISCOVERED. NO DELAY CLAIMS WILL BE ACCEPTED IF THE APPARENT
CONTRACTOR SHALL REPORT POTENTIAL UTILITY CONFLICTS TO THE CONSTRUCTION MANAGER PIPELINE AND PARALLEL UTILITIES WITHIN TEN (10) FEET OF THE ALIGNMENT CENTERLINES. THE
ALIGNMENTS TO CONFIRM CLEARANCE BETWEEN THE EXISTING UTILITY AND THE NEW RECYCLED WATER IN THE VACINITY OF THOSE UTILITIES. UTILITIES TO BE POTHOLED INCLUDE ALL THAT CROSS THE PIPELINE NINETY (90) DAYS OF NOTICE TO PROCEED BUT NOT LESS THAN THIRTY (30) DAYS PRIOR TO EXCAVATION
UNDER THIS CONTRACT PRIOR TO SUBMITTING PIPE LAY DRAWINGS TO CONSTRUCTION MANAGER WITHIN
20. THE CONTRACTOR SHALL POTHOLE EXISTING UTILITIES THAT MAY BE AFFECTED BY CONSTRUCTION DRAWINGS, SHALL BE PROVIDED PRIOR TO CASTING CONCRETE.
REVEALS NOT SHOWN ON THE STRUCTURAL DRAWINGS, THAT ARE REQUIRED BY OTHER CONTRACT
19. MECHANICAL AND ELECTRICAL EQUIPMENT SUPPORTS, ANCHORAGES, OPENINGS, RECESSES, AND VERIFIED BY THE CONTRACTOR PRIOR TO CONSTRUCTION.
OPENINGS CONTROLLED BY ARCHITECTURAL, MECHANICAL, OR ELECTRICAL EQUIPMENT SHALL BE BEFORE PLACING ANY STRUCTURAL STEEL OR CONCRETE. ALSO, STRUCTURAL DIMENSIONS AND
18. CONTRACTOR SHALL VERIFY LOCATION OF ALL ARCHITECTURAL, MECHANICAL, AND ELECTRICAL ITEMS
17. PROVIDE ALL SHEETING/SHORING REQUIRED TO PROTECT EXISTING STRUCTURES, PIPES AND FACILITIES.
OWNER OF THE ELECTRIC LINES.
LINES. CONTRACTOR SHALL ABIDE BY THE NATIONAL ELECTRIC CODE AND ANY REQUIREMENT BY THE
16. THE CONTRACTOR SHALL TAKE SPECIAL PRECAUTIONS IN THE VICINITY OF ANY OVERHEAD ELECTRIC DOWNTIME SHALL BE A MAXIMUM OF 2 HOURS, UNLESS SPECIFIED OR SHOWN OTHERWISE.
THE EXISTING PIPE SHALL REMAIN IN SERVICE UNTIL NEW PIPING IS READY TO BE PLACED INTO SERVICE.
15. CONTRACTOR SHALL REROUTE THE EXISTING PIPING IF REQUIRED TO MISS THE PROPOSED STRUCTURES.
TO MAINTAIN SERVICE.
PHASES OF WORK, AND IT CONFLICTS WITH NEW PIPING, TEMPORARILY RELOCATE PIPING AS REQUIRED
WHERE PIPING IS TO BE ABANDONED AND MUST REMAIN IN SERVICE UNTIL COMPLETION OF OTHER
14. ALL EXISTING PIPES THAT ARE TO BE ABANDONED IN PLACE OR REMOVED MAY NOT BE SHOWN.
IS NO LONGER IN SERVICE. LINES IN SERVICE SHALL BE MAINTAINED UNTIL NO LONGER REQUIRED.
13. CONTRACTOR SHALL VERIFY THAT PIPING SHOWN TO BE ABANDONED OR AS ABANDONED PREVIOUSLY CONTACT INFORMATION IS PROVIDED BELOW:
QUESTIONS OR COORDINATION OF CONSTRUCTION RELATED TO EXISTING UTILITIES. THE
12. THE CONTRACTOR SHALL CONTACT THE PROPER UTILITY REPRESENTATIVE AS FOLLOWS FOR GRADE AND VAULTS SHALL BE SIX INCHES ABOVE FINISHED GRADE.
WISE SHOWN OR DIRECTED. MANHOLES IN OPEN FIELDS SHALL BE SET TWELVE INCHES ABOVE FINISHED
11. ADJUST ALL VALVE BOXES, VAULTS, PULL BOXES, AND MANHOLES TO FINISHED GRADE UNLESS OTHERPROVIDE ALL SUPPORTS REQUIRED FOR A RIGIDLY SUPPORTED COMPLETE AND WORKING SYSTEM.
SHALL PROVIDE ALL FITTINGS, ADAPTERS, AND APPURTENANCES REQUIRED TO MAKE THE CONNECTIONS.
10. CONTRACTOR SHALL MAKE CONNECTIONS TO EXISTING PIPE, EQUIPMENT, ETC. AS REQUIRED AND WITHOUT ADDITIONAL COMPENSATION.
OR RECONSTRUCTED TO THE ORIGINAL OR BETTER CONDITION AT THE CONTRACTOR'S EXPENSE
ALL FACILITIES DAMAGED BY THE CONTRACTOR'S OPERATIONS SHALL BE EXPEDITIOUSLY REPAIRED DAMAGE EXISTING FACILITIES AND UTILITIES SHOWN OR NOT SHOWN THAT ARE TO REMAIN IN PLACE.
9. THE CONTRACTOR SHALL TAKE ALL PRECAUTIONARY MEASURES NECESSARY TO PROTECT FROM SHOWN AROUND OR NEAR AREAS OF NEW CONSTRUCTION PRIOR TO START OF CONSTRUCTION.
THE CONTRACTOR SHALL FIELD VERIFY ALL LOCATIONS, SIZES, MATERIAL TYPES, AND ELEVATIONS RESPONSIBILITY FOR FACILITIES AND UTILITIES NOT SHOWN OR NOT IN THE LOCATION SHOWN.
AVAILABLE RECORDS OR ELECTRONIC FILES. NEITHER THE OWNER NOR ENGINEER ASSUMES ANY
8. EXISTING FACILITY AND UTILITY INFORMATION SHOWN ON THE DRAWINGS WAS OBTAINED FROM ADDITIONAL COST TO THE OWNER. CONTRACTOR SHALL INCLUDE COST FOR THIS IN THE BID.
FOR FURNISHING ALL FITTINGS AND ADAPTERS REQUIRED TO MAKE THE ROUTING CHANGES AT NO ARE NECESSARY TO MISS EXISTING PIPES, STRUCTURES, ETC. CONTRACTOR SHALL BE RESPONSIBLE OF 36" UNLESS NOTED OTHERWISE. PIPES SHALL BE ROUTED AS SHOWN UNLESS MINOR REVISIONS SPECIFICALLY INDICATED ON THE DRAWINGS. PIPE SMALLER THAN 12" SHALL HAVE A MINIMUM COVER
7. ALL PIPELINES 12" AND LARGER SHALL HAVE A MINIMUM COVER OF 48" UNLESS THE COVER DEPTH IS OWNER.
AND REINSTALL THEM AS REQUIRED TO ELIMINATE THE CONFLICT AT NO ADDITIONAL COST TO THE
SHALL TEMPORARILY RELOCATE CONFLICTING EXISTING UTILITIES AT TIE-IN/CONNECTION LOCATIONS LOCATION OF ALL EXISTING PIPING AND UTILITIES IN THE CONSTRUCTION AREA. THE CONTRACTOR
AND/OR OTHER PROPOSED UTILITIES, CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE
6. PRIOR TO EXCAVATION FOR NEW STRUCTURES, ELECTRICAL CONDUIT, FABRICATION OF NEW PIPING AND REQUIREMENTS.
5. CONTRACTOR SHALL COMPLY WITH LOCAL CONSTRUCTION STORM WATER DISCHARGE REGULATIONS IN THE SAME AS FOR OTHER SIMILIAR WORK.
4. WHERE NO CONSTRUCTION DETAILS ARE SHOWN OR NOTED FOR ANY PART OF WORK. DETAILS SHALL BE EVEN THOUGH NOT REFERENCED AT SPECIFIC LOCATIONS ON DRAWINGS.
AS INDICATED IN THE APPLICABLE TYPICAL DETAILS AND GENERAL NOTES. TYPICAL DETAILS SHALL APPLY
3. UNLESS DETAILED, SPECIFIED, OR OTHERWISE INDICATED ON THE DRAWINGS, CONSTRUCTION SHALL BE DOCUMENTS AND EXISTING CONSTRUCTION BEFORE PROCEEDING WITH WORK.
UTILITIES. CONTRACTOR SHALL NOTIFY ENGINEER IF THERE IS A CONFLICT BETWEEN THE CONTRACT
EXISTING CONDITIONS INCLUDING LOCATION AND DIMENSIONS OF ALL EXISTING CONSTRUCTION AND THE ENGINEER OF ANY DISCREPANCIES. CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFYING ALL
2. CONTRACTOR SHALL VERIFY ALL DIMENSIONS BEFORE STARTING WORK AND SHALL IMMEDIATELY NOTIFY THEY WERE WRITTEN IN THEIR ENTIRETY ON EACH SHEET.
1. FOLLOWING NOTES ARE GENERAL AND APPLY TO ALL SHEETS OF THESE CONTRACT DOCUMENTS AS IF THE PLANS.
WATER, SEWER, ELECTRIC, AND CABLE LATERAL WHICH MAY NOT BE SHOWN ON
25. CONTRACTOR SHALL ASSUME THAT EACH PROPERTY HAS AN EXISTING GAS, PER UTILITY OWNERS SPECIFICATIONS DURING EXCAVATION.
ELECTRIC UTILITIES AND POLES. ELECTRIC UTILITY POLES SHALL BE SUPPORTED
24. CONTRACTOR SHALL USE CAUTION WHILE WORKING AROUND EXISTING OVERHEAD ENCROACHMENT PERMIT REQUIREMENTS.
ACCORDANCE WITH THE SPECIFICATIONS AND THE COUNTY
COORDINATED WITH THE TRAFFIC CONTROL PLAN AND IN
MENDOCINO COUNTY, AND SHALL IMPLEMENT TRAFFIC CONTROL
CONTRACTOR SHALL SUBMIT A TRAFFIC CONTROL PLAN TO
RESUMED. FOR CONSTRUCTION OUTSIDE OF CITY LIMITS, THE
PLATES (NON-SKID SURFACE TYPE) AND TWO WAY TRAFFIC SHALL BE
EACH WORKING DAY, EXCAVATIONS MUST BE COVERED WITH STEEL IN THE SPECIFICATIONS, INCLUDING SECTION 01140. AT THE CLOSE OF
23. CONTRACTOR SHALL COMPLY WITH TRAFFIC RESTRICTIONS DETAILED WITH WORK.
DOCUMENTS AND EXISTING CONSTRUCTION BEFORE PROCEEDING
NOTIFY ENGINEER IF THERE IS A CONFLICT BETWEEN THE CONTRACT ALL EXISTING CONSTRUCTION AND UTILITIES. CONTRACTOR SHALL
EXISTING CONDITIONS INCLUDING LOCATION AND DIMENSIONS OF
22. CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFYING ALL EXCAVATIONS.
SHALL COMPLY WITH ALL APPLICABLE REGULATIONS PRIOR TO AND DURING 48 HOURS IN ADVANCE OF ANY EXCAVATION (1-800-277-2600). THE CONTRACTOR
21. THE CONTRACTOR SHALL NOTIFY UNDERGROUND SERVICE ALERT (USA) AT LEAST
GENERAL NOTES CONTINUED
Digitally signed by Brian W. Avon
Contact Info: Carollo Engineers, Inc.
Date: 2023.04.10 09:19:42-07'00'
REV DATE BY DESCRIPTION
DATE
CHECKED
DRAWN
DESIGNED
8660F.10
JOB NO.
DRAWING NO.
SHEET NO.
SCALES ACCORDINGLY
VERIFY SCALES
THIS SHEET, ADJUST
IF NOT ONE INCH ON
BAR IS ONE INCH ON
ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200
CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 76832
P
lotD
ate: 06-APR
-2023 10:23:50
AM
U
ser:svcPW
Model:
Layout1 C
olorTable:gshade.ctb
D
esignS
cript:
C
arollo_S
td_P
en_v0905.pen
P
lotScale:1:1 LA
S
T
SAVED
B
Y:
PROJECT NO. FILE NAME:
JG
arretty
K
W
N
Y
I
Q
A
B
C
J
H
P
S
V
U
R
D M
F
T
L
E
O
G
GV
GSP
H1E
H
GRV
GPM
GPD
GRTG
GR
H2E
HP
HORIZ
HPU
HPA
HGT
HDW
HB
HEF
HDWL
GND
FX
FW
G
FXC
FV
FT or '
FSTN
FUP
FTG
GA
GL
GEN
GM
GLV
GEL
GALV
GAL
GB
GAV
LAV
LAB
LDF
LB(S)
L
JST
IRR
KGV
JT
LDFR
LP
LLV
LPG
LPA
LLH
LG
LF
LL
LHRA
IP
HWR
HWL
HxW
HWS
HW
HSF
HR
HV
HTX
HYD
INSTR
INJ
INV
INSUL
INF
ID
IA
INCL
IN or "
EJ
EIFS
EMBED
EJR
EG
ED
ECU
EFF
EF
EMH
ESEW
ES
EUH
ET
ER
EPS
EP
EQ
EPV
ECC RED
DR
DPV
DRV
DRT
DO
DMS
DMP
do
DN
DS
E
DWL(S)
EC
EA
DWD
DUC
DSW
DW
DUH
FLD
FLA
FLEX
FLE
FL
FILT
FH
FIN FL
FIN
FLG
FRPP
FPP
FS
FRS
FPM
FLGA
FO
FND
FG
EXPO
EXP
FAD
EXT
EWH
EW
EVR
EWEF
EWC
FB
FDL
FD
FEFF
FDR
FCU
FC
FBW
FCO
FCA
REG
REF
REJ
REINF
RED
RDL
RD
RECIRC
RDOF
REQD
RHRB
RH
RM
RLS
RG
RES
RER
RF
REV
RCP
PSI
PSG
PT
PSIG
PSF
PRR
PROJ
PS
PRV
PV
QTY
PLW
RAS
R/W
PVT
PVDF
PVC
PVMT
PVI
SEC
SE
SED
SECT
SDO
SCR
SCR
SDL
SD
SEP
SHT
SHR
SK
SIM
SHDR
SFW
SF
SHD
SG
SCO
RT
RR
RUD
RTF
RPMP
ROT
RO
RPM
RP
RW
SCB
SC
SCFM
SCD
SA
RWW
RWR
S
S/W
MOD
MO
MON
MOIST
ML
MIX
MISC
MK
MJ
MOS
NG
NEV
NO., #
NIC
NA
MS
MPM
N
MTD
MIN
MAN
MAINT
MAU
MATL
M
LS
LR
LWL
LT
MAX
MG/L
MFR
MH
MGD
MET
MC
MB
MECH
MD
PLAS
PIV
PMP
PLWD
PI
PERP
PE
PH
PG
PNL(S)
PRC
PPMV
PRI
PRG
PP
POLY
POL
POW
POS
PDP
OD
OC
OPP
OPNG
OBD
NPT
NOM
O
OPP HND
PCP
PCCP
PD, PLD
PD
PCC
OZ
PC
PBL
DLV
TOP OF
INSIDE FACE
WTP WATER TREATMENT PLANT
WEATHERPROOF, WATERPROOF
NUMBER (REBAR Ø)
OUTSIDE FACE
RSR
WORKING POINT
TRD
RISER
RAD
TREAD
TOP OF STEEL
WPT
TAS THREADED ANCHOR STUD
#
ELL
EXHAUST FAN, EACH FACE
DEFLECTION ANGLE, CENTRAL ANGLE
EL
FRP
INTERIOR
FIBERGLASS REINFORCED PLASTIC
INT
CLEANOUT
O.F.
CTJ
I.F.
T.O.
CONTROL JOINT
HOOK ONE END
HOOK TWO ENDS
GALVANIZE(D)
ADDL ADDITIONAL
CIRC
ADJACENT, ADJUST, ADJUSTABLE
ABOVE FINISHED FLOOR
CONSTRUCTION JOINT
COL(S)
AL
APPROXIMATE, APPROXIMATELY
POLYMER SOLUTION
UHMW ULTRA HIGH MOLECULAR WEIGHT
UHMWPE ULTRA HIGH MOLECULAR WEIGHT POLYETHYLENE
WRS
HIGH DENSITY POLYETHYLENE
PLS
HDPE
COLUMN(S)
LEFT HAND
LOW PRESSURE
HOLLOW STRUCTURAL SECTION (STEEL)
LH
LPT
NEAR SIDE
NOT IN CONTRACT
LOW POINT
NS
HIGH POINT
ELBOW
ELEVATION
DEMO DEMOLISH, DEMOLITION
EQUIP
FIBERGLASS REINFORCED PLASTIC PIPE
HPT
EX
FINISHED GRADE
CHLORIDE
TIME DELAY RELAY, TOWEL DISPENSER/RECEPTACLE
RIGHT HAND REVERSE ACTIVE
RIGHT HAND REVERSE
TOP OF GRATING
VEC VINYL ESTER COATING
THICKENER SUPERNATANT OR SUBNATANT
TRIAD (THREE CONDUCTOR SHIELDED CABLE), TIMING RELAY
RHRA
REGULATION VALVE, PRESSURE RELIEF VALVE
PREFAB
MASY MASONRY
PREFABRICATED
STORE FRONT GLAZING SYSTEM
RHR
SGS
STATIC PRESSURE, SET POINT WATER SURFACE
POINT, POINT OF TANGENCY
REVISION, REVERSE
TOP OF CURB
SERVICE VALVE, SHUTOFF VALVE, SOLENOID VALVE
WATER METER
VALVE
WEST, WIDTH
PROGRESSIVE CAVITY PUMP
ASPHALTIC CONCRETE
CATCH BASIN
WSTP WATERSTOP
CONTROL POINT
BFG BELOW FINISHED GRADE
CARPET
END OF CURVE
WTF
WWTF
TUR TURBINE
WATER TREATMENT FACILITY
BTWN BETWEEN
WASTEWATER TREATMENT FACILITY
FIN GR
TANGENT LENGTH, THERMOSTAT, TIMER
OPEN EQUIPMENT DRAIN
NPW
OED
NON-POTABLE WATER
RTU ROOF TOP UNIT
SCH
RADIUS, RADIAL
CIRCUMFERENTIAL/CIRCUMFERENCE
GENERAL, GENERATOR
GYPSUM
FXE FIRE EXTINGUISHER - ELECTRICAL
GYP
LHR LEFT HAND REVERSE
LHRB LEFT HAND REVERSE BEVEL
FACTORY
CURRENT TRANSFORMER, CERAMIC TILE
CLK
CORRUGATE(D), CORROSION
BCKR
EXIST
FACT
BACKER BOARD
EXISTING
CKF
CKB
CKS
CKA
CI
CHKD PL
CJ
CIP
CLD
CMLC
CML
CMU
CMP
CLV
CLP
CLL
CLS
CLR
CHF
C
BV
CAUSTIC
CA
BTU
BPV
BOTTS
BSP
BRG
CB
CFM
CF
CHEMD
CFS
CEF
CD
CC
CDT
CDL
DDR
DFL
DET
DBL
CY
CWV
D/W
D
DG
DISCH
DIP
DL
DIW
DIM
DIAG
DIG
DIF
CW
CORR
CPT
CP
CONST
CO
CNV
CONN
CONC
CPVC
CU
CTSK
CV
CUP
CTR
CSP
CS
CTL
CT
MASONRY CONTROL JOINT
HEADED ANCHOR STUD
MCJ
CCB
COUPLING
CLSM
CHLORINE CONTACT BASIN
CPLG
HAS
ACI
ACB
ACU
ACP
AC
AB
@
ABS
ABC
CONTROLLED LOW STRENGTH MATERIAL
HSS
GC
GRAVITY BELT THICKENER
NC
SPECIFICATION(S)
TOG
NORMALLY CLOSED
SPEC(S)
GROOVED COUPLING
DWG(S)
DOWEL(S)
CONNECT, CONNECTION
DRAWING(S)
ELEC
FIRE DEPARTMENT CONNECTION
GBT
ELECTRICAL
FDC
BD
BCM
BDR
BDD
BC
AVG
AV
AW
AVV
BF
BLR
BLKHD
BOTT
BLK
BFV
BFP
BLDG
BKW
ASTM
AFC
AER
AFM
AFF
AED
ADJ
AD
ADR
ADMIN
AHU
ARCH
APPROX
ASSY
ARV
ANV
AIL
AIC
ANCH
ALT
SL
POLYMER BLENDER
POINT OF CURVATURE
OUNCE
OPENING
OPPOSITE HAND
OPPOSITE
PRESTRESSED CONCRETE CYLINDER PIPE
PRESSURE GAUGE
POST INDICATOR VALVE
POINT OF INTERSECTION
PERPENDICULAR
PULSATION DAMPENER
POSITIVE DISPLACEMENT, PLANT DRAIN
PLAIN END
POSITIVE DISPLACEMENT PUMP
OUTSIDE DIAMETER, OUTSIDE DIMENSION
MOP SINK
METERING PUMP
NORTH, NEUTRAL
MOUNTED
MOISTURE SEPARATOR
MODIFIED
MASONRY OPENING
MONUMENT
MOISTURE
NOT APPLICABLE
OPEN
ON CENTER
OPPOSED BLADE DAMPER
NATIONAL PIPE THREAD
NATURAL GRADE, NATURAL OR LP GAS
VALVE, NEEDLE
NOMINAL
NUMBER
PAVEMENT
POINT OF VERTICAL INTERSECTION
PLANT WATER
POINT OF VERTICAL TANGENCY
POUNDS PER SQUARE INCH GAUGE
POUNDS PER SQUARE INCH
POINT OF VERTICAL CURVATURE, POLYVINYL
PLUG VALVE
QUANTITY
RECIRCULATING
ROOF DRAIN OVERFLOW
REFERENCE
REDUCER, ROOF EQUIPMENT DRAIN
ROOF DRAIN LINE
RETURN ACTIVATED SLUDGE
RIGHT OF WAY
ROOF DRAIN
REINFORCED CONCRETE PIPE
PRESSURE GAUGE
POLYETHYLENE
POLYMER
POTABLE WATER
POSITION
PANEL(S)
PLASTIC
PLATE, PROPERTY LINE
PUMP
PLYWOOD
POWER POLE
PRESSURE REDUCING VALVE, PRESSURE
PRESSURE OR VACUUM RELIEF VALVE
POUNDS PER SQUARE FOOT
PUMP STATION, PIPE SUPPORT
PROJECTION
POINT OF REVERSE CURVATURE
PARTS PER MILLION (VOLUME)
PRIMARY
PRESSURE REGULATOR
INSTRUMENT AIR
HYDRANT
INCLUDE, INCLUDING
INCHES
HEIGHT BY WIDTH
HOT WATER SUPPLY
HOT WATER RETURN
INFLUENT
JOIST
KNIFE GATE VALVE
JOINT
IRON PIPE
INSTRUMENTATION
INJECTOR
INVERT
INSULAT(E)(ED)(ING)(ION)
HOSE VALVE
GATE VALVE
GALVANIZED STEEL PIPE
HOSE BIBB
EXPLOSION-PROOF, HIGH, HORIZONTAL
GRAVITY VENTILATOR
GALLONS PER MINUTE
GALLONS PER DAY
GRATING
GRADE
HARDWARE
HANDRAIL, HOSE REEL, HOUR
HEAT PUMP UNIT AIR
HEAT EXCHANGER
HOOD SUPPLY FAN
HIGH PRESSURE AIR
HOOD EXHAUST FAN
HEADWALL
HORIZONTAL
HEIGHT
MOTORIZED DAMPER
MECHANICAL COUPLING
METAL
MECHANICAL
MACHINE BOLT
MATERIAL
MANUAL
MAXIMUM
MAKE-UP AIR UNIT
MANUFACTURER
MECHANICAL JOINT
MIXER
MIXED LIQUOR
MARK
MISCELLANEOUS
MILLION GALLONS PER DAY
MILLIGRAMS PER LITER
MINIMUM
MANHOLE
MAINTENANCE
LINEAL FEET
LIQUID DIESEL FUEL RETURN
LEFT HAND REVERSE ACTIVE
LONG
LIQUID DIESEL FUEL
LABORATORY
ANGLE (STRUCTURAL), LENGTH, LOUVER
POUND(S)
LAVATORY
LIVE LOAD
LEFT
LAB SINK
MOTOR
LOW WATER LEVEL
LONG RADIUS
LONG LEG VERTICAL
LONG LEG HORIZONTAL
LIQUIFIED PROPANE GAS
LOW PRESSURE AIR
TURBIDIMETER SAMPLE
THICKENED SLUDGE DECANT
TELEPHONE TERMINAL BOARD
THERMOSTAT
TOP OF WALL
TANK
TEMPERATURE
TOP OF MASONRY
TOP OF CONCRETE
TURNING VANES
VARIES
UTILITY SINK
VITRIFIED CLAY PIPE
VALVE BOX
UNLESS NOTED OTHERWISE
TYPICAL
THREE-WAY VALVE
UNDERCUT
TELEPHONE MANHOLE
PIPE SUPPORT, SUPPORT
SLUICE GATE
SYMMETRICAL
SEAL WATER
STRUCTURAL
STEAM
STEEL
STRAINER
STEEL PIPE
SYNTHETIC
THICKENER, THICKNESS, THICK
TEST HOLE
TELESCOPING VALVE
THICKENED SLUDGE
TELEPHONE
TEMPORARY BENCHMARK
TOP AND BOTTOM
TOTAL DYNAMIC HEAD
TEMPERATURE CONTROL VALVE
YARD HYDRANT
YARD CLEANOUT
SSL SECONDARY SLUDGE
WYE
WASTEWATER
WATER CONTROL VALVE
WASTEWATER TREATMENT PLANT
WELDED WIRE FABRIC
PLCS
EMERGENCY HAND SWITCH
DP DEEP (OR DEPTH)
ESS
SW
PLACES
BG BREAK GLASS HAND SWITCH
WATER
WITH
VENT THROUGH ROOF
WASTE ACTIVATED SLUDGE
WITHOUT
VACUUM REGULATING VALVE
VOLUMETRIC FEEDER
VERTICAL
VOLUME
VACUUM GAUGE, VALLEY GUTTER
WALL CLEANOUT
WEIR GATE
WASTE OIL DRAIN
WALK THROUGH, WEIGHT
WATER SOFTENER
WALL LOUVER, WATER LEVEL
WALL FITTING, WASH FOUNTAIN
WALL EXHAUST FAN
WEIGHT INDICATOR
WATER HEATER
SAMPLE
SCRUBBER
SECONDARY CLARIFIER
SIDEWALK
RUPTURE DISK
RAW WASTEWATER
SMOKE CONTROL DAMPER
SUMP DISCHARGE DRAIN LINE
SECONDARY EFFLUENT
SLUDGE DRAWOFF
SILICON CONTROL RECTIFIER
SCHEDULE
STANDARD CUBIC FEET PER MINUTE
BAR SCREEN
SURFACE CLEANOUT
ROTARY FEEDER
RETURN FAN
RESERVOIR
RIGHT HAND
RETURN GRILLE RUBBER GASKET
REACTOR
REINFORCE(D)(ING)(MENT)
REGULATOR, REGULATING
REQUIRED
RUBBER EXPANSION JOINT
RIGHT HAND REVERSE BEVEL
REINFORCED PLASTIC MORTAR PIPE
REVOLUTIONS PER MINUTE
RIGHT
RADIUS POINT
ROOM
REGISTERED LAND SURVEYOR
ROTAMETER
ROUGH OPENING
SQUARE
SAMPLE WATER
SQUARE INCH(ES)
SQUARE FEET
SAMPLE SINK
SINGLE POLE DOUBLE THROW
SUMP PUMP DRAIN
SPARE
SPLITTER BOX
SHORT RADIUS, SUPPLY REGISTER
STANDARDS(S)
STABILIZER
STIRRUPS
STIFFENER
STATION
SANITARY SEWER, SELECTOR SWITCH
SCRUBBER RECIRCULATION LIQUID (CAUSTIC)
STAINLESS STEEL
SERVICE SINK
SOLUTION
SUPPLY GRILLE
SOFTENED WATER
SOLIDS HANDLING-RECYCLE
SHOWER DRAIN
SUPPLY FAN
SECTION
SECONDARY, SECOND
SEPTAGE
SEDIMENTATION
SHOWER
SLEEVE VALVE
SLIDE GATE
SUPERNATANT OR SUBNATANT
SAMPLER, SUMP PUMP
SLUDGE COLLECTOR DRIVE
SIMILAR
SHEET
SLOPE, SLUDGE
SKIMMINGS
GROUND
AT (MEASUREMENT)
YH
AGGREGATE BASE COURSE
YCO
WWF
WW
Y
WWTP
ACRYLONITRILE BUTADIENE STYRENE
ACCESS DOOR
ADMINISTRATION
AERAT(ION)(OR)
AREA EQUIPMENT DRAIN
AREA DRAIN
AMERICAN CONCRETE INSTITUTE
AIR CIRCUIT BREAKER
AIR CONDITIONING UNIT
ASBESTOS CEMENT PIPE
WV
WCO
WAS
WF
WEF
W/O
VTR
VRV
W/
W
WH
WS
WRG
WTR
WT
WP
WL
WI
WOD
WM
BLOCK
BUILDING
PROCESS BLOWER
BULKHEAD
BACKWASH
BASIN DRAIN LINE
BACKDRAFT DAMPER
BUTTERFLY VALVE
BLIND FLANGE
BALL VALVE
BRITISH THERMAL UNITS
CAUSTIC SOLUTION (CONCENTRATED OR DILUTE)
CONCRETE ANCHOR
BLACK STEEL PIPE
BOTTOM SLUDGE
BOTTOM
BEARING
BACK PRESSURE VALVE
BOARD
ALUMINUM
ALTERNATE
ANGLE VALVE
ANCHOR
AIR INTAKE LOUVER
AIR FLOW MONITOR
AFTERCOOLER
AIR COMPRESSOR
AIR HANDLING UNIT
ARCHITECTURAL
ACID WASTE
AIR AND VACUUM VALVE
BATCHMETER
AVERAGE
ASSEMBLY
AIR RELEASE VALVE
ACID VENT
AMERICAN SOCIETY FOR TESTING AND MATERIALS
STIR
STIFF
STM
STL
STD(S)
ST
STB
STA
STP
SYM
SWR
T
SYN
SV
STRUCT
STR
SUPT
SUG
SSK
SP
SOL
SPDT
SPD
SN
SLG
SLC
SMP
SLV
SPL
SR
SQ IN(S)
SS
SRL
SQ FT
SPS
SPR
SQ
SPW
TYP
TWV
UC
TV
TSPL
TSD
TTB
TSTAT
UNO
VFR
VERT
VOL
VG
VCP
V
US
VB
VAR
TS
TEL
TDR
THK
TH
TDH
TBM
T&B
TCV
TC
TKS
TOS
TOM
TR
TOC
TMH
TLV
TNK
TMP
ELECTRIC WATER HEATER, EXHAUST
EACH WAY EACH FACE
EXPANSION, EXPANSION TANK
EXISTING
ELECTRIC WATER COOLER
ELECTRIC UNIT HEATER
ELECTRICALLY HEAT TRACED
EACH WAY
EVAPORATOR
EXPOSED
FLOOR CLEANOUT
FLANGE COUPLING ADAPTER
FIRE DAMPER, FLOOR DRAIN, FOUND
FAN COIL UNIT
FACE OF CURB, FLEXIBLE COUPLING
FOUL AIR DUCT
EXTERIOR
FILTER BACKWASH
FLAT BAR
EMERGENCY SHOWER AND EYE WASH
EFFLUENT
EXPANSION JOINT
EXTERIOR INSULATION AND FINISH SYSTEM
EQUIPMENT DRAIN
EACH
EAST
EVAPORATOR COOLING UNIT
ECCENTRIC REDUCER
INJECTOR/EDUCTOR
EQUIPMENT
EQUAL
EACH SIDE
EXHAUST REGISTER
ECCENTRIC PLUG VALVE
ELECTRICAL MANHOLE
EMBEDMENT
EXPANDED POLYSTYRENE
FLAP VALVE
FUEL DISPENSER
FIRE EXTINGUISHER
FOOTING
FROTH SPRAY
FOOT, FEET
FASTEN(ED)
FIRE EXTINGUISHER CABINET
GLASS
GRAVITY EXHAUST LOUVER
GAS METER
GLOBE VALVE
GRADE BREAK
GAUGE or GAGE
GAS, GROUND, GUTTER
GRAVITY VENTILATOR
GALLONS
FLEXIBLE PLASTIC PIPE
FILTRATE
FINISHED FLOOR
FIRE HYDRANT
FEEDER
FLOOR DRAIN LINE
FLAP GATE
FINAL EFFLUENT
FOUL AIR
FOUNDATION
FEET PER MINUTE
FILTER EFFLUENT
FILTER DRAIN
FLANGE, OR FLANGED
FLEXIBLE
CEMENT MORTAR LINED AND COATED
CEMENT MORTAR LINED
CONCRETE MASONRY UNIT
CORRUGATED METAL PIPE
CHLORINE GAS (VACUUM)
CHLORINE GAS (PRESSURE)
CHLORINE LIQUID
CHLORINE SOLUTION
CLEAR
CONVEYOR
CONTROL
CHEMICAL SUMP PUMP, CORRUGATED STEEL PIPE
COUNTERSUNK
CENTER, CENTERED
CARBON STEEL, CIRCULATING SLUDGE
CONSTRUCTION
CONCRETE
CHLORINATED POLYVINYL CHLORIDE
CHLORINE LEAK DETECTOR
CUBIC FEET PER MINUTE
CUBIC FEET
CHEMICAL DRAIN
CUBIC FEET PER SECOND
CEILING EXHAUST FAN
CEILING DIFFUSER, CONDENSATE DRAIN
CONDUIT
CHEMICAL DRAIN LINE
CHEMICAL FEEDER
CHECK VALVE, SWING
CHECK VALVE, FLAP
CHAIN LINK
CENTER LINE
CHECK VALVE, BALL
CAST IRON
CHECKERED PLATE
CHECK VALVE, ANGLE
CAST IRON PIPE
DOWN
DIAPHRAGM SEAL
DOOR OPENING
DITTO
DAMPER
DEIONIZED WATER
DISCHARGE
DOOR LOUVER
DEAD LOAD, DRAIN LINE
DIAPHRAGM VALVE
DUCT HEATER UNIT
DUST COLLECTOR
DEWATERING DRAIN
DISTILLED WATER
DISTILLED WATER, DOOR SWITCH
DRIP TRAP
DIGESTED SLUDGE, DOWN SPOUT
DRAIN VALVE
DUCTILE IRON PIPE
DEPTH, DIGITAL OR DISCRETE, DRAIN
CUBIC YARD
DOUBLE
DRIVEWAY
COMBINATION WASTE AND VENT
COPPER PIPE
CUBIC
COLD WATER
CHECK VALVE
DESICCANT DRYER
DIFFUSER
DIAGONAL
DIMENSION
DIGESTER
DIAMETER
DETAIL
DEGREE
DOOR GRILLE
DECANT/FILTRATE
SOUTH, SWITCH, SLOPE
CL
PL
FLOOR, FLOW LINE
T.O.W.
SST
FOB
FOC
FLAT ON BOTTOM
FACE OF CURB
BWCCP BAR-WRAPPED CONCRETE CYLINDER PIPE
RCCP REINFORCED CONCRETE CYLINDER PIPE
FLUSHING WATER, FINISHED WATER
CE
CE
4 GENERAL
GENERAL ABBREVIATIONS
00G04
POLYVINYLIDENE FLUORIDE
8660F1000G04.dgn
WV WATER VALVE
VLT VAULT
VPI VERTICAL POINT OF INTERSECTION
VC VERTICAL CURVE
UNKN
UGTEL
UGPB
UGG
UGE
UG
UNKNOWN
UNDERGROUND TELEPHONE
UNDERGROUND POWER BOX
UNDERGROUND G
UNDERGROUND ELECTRIC
UNDERGROUND
TOP
TS TRAFFIC SIGNAL
TOP OF PIPE
TB THRUST BLOCK
SANITARY WASTE, SOUTHWEST
SLUDGE TRANSFER, STREET
SSCO SANITARY SEWER CLEANOUT
SSMH SANITARY SEWER MANHOLE
SRF STATE REVOLVING FUND
SO2 SULFUR DIOXIDE
SDVLT
SDMH
SDDI
STORM DRAIN VAULT
STORM DRAIN MANHOLE
STORM DRAIN DROP INLET
SHLD SHOULDER
SMOKE DETECTOR, SPLITTER DAMPER, STORM DRAIN
RECLAIMED WATER RETURN
RECLAIMED WATER, REUSE WATER, RECYCLED WATER
RETURN REGISTER, RAILROAD
RCW RECLAIMED WATER
PHASE, PHYSICALLY HANDICAPPED, POT HOLE,
POINT OF COMPOUND CURVE
PLANT CONTROL CENTER,
OHW
OHU
OHE
OFL
OVERHEAD WIRE
OVERHEAD UTILITIES
OVERHEAD ELECTRIC
OVERFLOW
OTF OUTFALL
NWPRR
NW
NTS
NORTHWESTERN PACIFIC RAILROAD
NORTHWEST
NOT TO SCALE
LAT LATERAL
LONG LONGITUDINAL
JNCT JUNCTION
ISR INTRINSICALLY SAFE RELAY
IRRIGATION
IDENTIFICATION
INSIDE DIAMETER, INSIDE DIMENSION,
I INTERSECTION OF ANGLE
HIGH WATER LEVEL, HEADWALL
HOT WATER, HEADWALL
HWY HIGHWAY
HDG HOT DIPPED GALVANIZED
HIGH POINT
HEAT PUMP, HORSEPOWER, HIGH PRESSURE,
FAR SIDE, FIRE SERVICES
FSP FABRICATED STEEL PIPE
FOT FLAT ON TOP
FUEL OIL, FIBER OPTIC OR CATV
FM FORCE MAIN
FMSS FORCE MAIN SANITARY SEWER
FLR FILTER
FLANGE ADAPTER
FINISH, FINAL
EXHAUST GRILLE, EXISTING GROUND
EVC
EUG ELECTRICAL UNDERGROUND
ELECTRIC UNIT HEATER, END OF VERTICAL CURVE
EOP EDGE OF PAVEMENT
EDGE OF PAVING
EOA END OF ALIGNMENT
DOOR, DRAIN, DRIVE
D/W DRIVEWAY APRON
DIFF DIFFERENCE
DI DROP INLET
CULV CULVERT
CONT CONTINUOUS OR CONTINUATION OR (D) (OUS)
COORD COORDINATE
CMLSP CEMENT MORTAR LINED STEEL PIPE
CM CONSTRUCTION MANAGER
CIPP CURED IN PLACE PIPE
CONCRETE CURB
CENTER OF CURVATURE, CENTER TO CENTER,
CARV
CATV
COMBINATION AIR RELEASE VALVE
CABLE TV
ANCHOR BOLT, AGGREGATE BASE
BELT FILTER PRESS, BACK FLOW PREVENTER
BOP
BOC
BOA
BM
BEGINNING OF PIPE
BACK OF CURB
BEGINNING OF ALIGNMENT
BEAM, BENCH MARK
BVC BEGINNING OF VERTICAL CURVE
BEGIN CURVE, BRASS CAP, BACK OF CURB,
BOLT CIRCLE
BYP BYPASS
CLOSE, CONDUIT CHANNEL (STRUCTURAL), CLARIFIER
COUED CITY OF UKIAH ELECTRICAL DEPARTMENT
PROP PROPERTY
P POLE
PAU PRODUCTION AUGMENTATION UNIT
DMJT DISMANTLING JOINT
MCK
8660F10
Digitally signed by Brian W. Avon
Contact Info: Carollo Engineers, Inc.
Date: 2023.04.10 09:17:59-07'00'
120
121 122
123
124
125
126
127
128
129
130 131
132
133
134
135
137 136 138
139
140
141 142
143
144
145
146
147
148
149 150
151
152
153
154
155
156
157
158
159
160 161
162
163
164
165
166 167 168
169
170
171
172
173
174
175
176
177
178
179
2519
2520
2521
2556
2557
2559
6069
6127
REV DATE BY DESCRIPTION
DATE
CHECKED
DRAWN
DESIGNED
8660F.10
JOB NO.
DRAWING NO.
SHEET NO.
SCALES ACCORDINGLY
VERIFY SCALES
THIS SHEET, ADJUST
IF NOT ONE INCH ON
BAR IS ONE INCH ON
ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200
CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 76832
BENCHMARK INFORMATION
HPGN- D CA 01 CG
THE STATION IS LOCATED ON U.S. HIGHWAY 101, ABOUT 9 MI (14.5 KM) NORTH OF HOPLAND AND ABOUT 4 MI (6.4 KM) SOUTH OF UKIAH. TO REACH THE STATION FROM THE COUNTY
COURTHOUSE AT THE CORNER OF NORTH STATE STREET AND PERKINS STREET IN UKIAH, GO EAST ON PERKINS STREET FOR 0.52 MI (0.84 KM) TO THE SOUTHBOUND ENTRANCE TO HIGHWAY 101. GO SOUTH ON THE ON RAMP AND ALONG HIGHWAY 101 FOR 3.74 MI (6.02 KM) TO THE COX-SCHRADER ROAD EXIT TO THE RIGHT. PROCEED ALONG THE OFF RAMP FOR 0.14 MI (0.23 KM) TO THE SOUTH SIDE
OF ROBINSON OVERCROSSING(BRIDGE NO. 10-86) AND THE STATION ON THE LEFT AT POST MILE 20.70. THE STATION IS A SURVEY DISK ENCASED IN PVC PIPE WITH ACCESS COVER SET IN CONCRETE FLUSH WITH THE GROUND, 43 FT (13.1 M) SOUTHWEST OF THE WEST END OF THE SOUTH RAIL OF THE OVERCROSSING, 40 FT (12.2 M) SOUTH OF THE EXTENDED CENTERLINE OF THE BRIDGE, 15 FT (4.6 M) EAST OF THE CENTERLINE OF THE RAMP, 12.6 FT (3.8 M) SOUTH OF A FREEWAY ENTRANCE SIGN, 3.7 FT (1.1 M) EAST OF THE BACK OF THE EAST RAMP CURB AND 3.0 FT (0.9 M) NORTHEAST OF A WITNESS
HPGN- UKIAH AIRPORT RESET
THE STATION IS LOCATED AT THE NORTH END OF UKIAH MUNI AIRPORT NEAR THE RUNWAY END OF 15. THE STATION IS 141.8 FT (43.2 M) EAST OF THE AIRPORT PERIMETER FENCE, 93.8 FT (28.6 M) NORTHWEST OF RM NO 3, 88.6 FT (27.0 M) WEST OF THE WESTERLY EDGE OF THE TAXIWAY, 2.0 FT (0.6 M) EAST OF A 4 INCH X 4 INCH WOODEN WITNESS POST, AND 2.9 FT (0.9 M) WEST OF A 4 INCH X 4 INCH WOODEN WITNESS POST. THE STATION IS USCGS TRIANGULATION DISK SET IN THE TOP OF A SQUARE 10 INCH CONCRETE MONUMENT SET FLUSH WITH THE GROUND AND STAMPED UKIAH AIRPORT 1949 1963.
NOTES:
1. BEARINGS AND DISTANCES ARE IN GRID.
2. HORIZONTAL DATUM-BETWEEN FOUND HPGN POINTS DESIGNATED AS UKIAH AIRPORT RESET AND HPGN D CA 01 CG. USE COMBINED SCALE FACTOR 0.99988998 WITH EPOCH DATE 2007.00. USE RECIPROCAL 1.000110032 TO ACHIEVE GROUND DISTANCES.
3. VERTICAL DATUM BASED ON NGS BENCH MARK DESIGNATES AS UKIAH RESET NAVD 1988=622.50.
0 200' 400' 800'
SCALE: 1" = 400'
PROJECT NO.
LAST SAVED BY:
FILE NAME:
RAF
BWH
JM
00G05
5 GENERAL
KEY MAP AND SURVEY CONTROL
8660F1000G05.dwg
JDiDonato
8660F10
4/7/2023 9:18:48 AM Plot Date:
BRUSH ST
ORR ST
MAZZONI ST
STATE ST
OAK ST
ELM ST
PINE ST
PINE ST
BUSH ST
ARLINGTON DR
BUSH ST
HAZEL AVE
JACKSON AVE
MAPLE AVE
LIVE OAK AVE
CYPRESS AVE
LIVE OAK AVE
PARK WEST BLVD
PARK BLVD
DORA AVE
GROVE AVE
WALNUT AVE
MAPLE AVE
DESPINA DR
LOW GAP RD
99C01
99C03 99C02
99C04
99C05
99C06
99C07
99C08 99C09
99C11
99C10
99C12
99C13
NW PACIFIC RR
HWY 101
LOCKWOOD DR
99C14
99C15
99C16
99C17
99C18
99C01
99C02
99C04
COORDINATE CONTROL POINTS
POINT
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
NORTHING
2186273.10
2186604.62
2186614.67
2186249.07
2186329.69
2186286.37
2186306.03
2186262.01
2186311.62
2183327.36
2183716.20
2183694.79
2184068.01
2184477.78
2184572.39
2183962.57
2185102.81
2185149.26
2185135.90
2185773.44
2186640.16
2184256.33
2184282.15
2184130.30
2184340.66
2184883.23
2185455.14
EASTING
6222121.03
6222286.89
6223021.90
6223015.03
6221748.07
6221243.05
6220346.09
6219806.65
6219323.79
6215308.64
6215652.09
6216322.36
6215978.88
6215680.93
6215178.59
6215258.81
6215665.34
6215417.92
6215495.28
6215540.54
6215142.70
6217140.87
6217278.95
6216661.28
6217769.55
6217714.30
6217581.19
ELEVATION
599.64
599.97
600.50
598.84
602.82
604.44
610.66
613.91
612.71
712.37
702.50
686.74
692.43
692.61
697.58
706.54
682.28
678.24
677.28
675.16
652.07
660.55
652.58
675.77
635.81
630.93
633.86
DESCRIPTION
CP 120 60D
CP 121 60D
CP 122 60D
CP 123 60D
CP 124 60D
CP 125 PKF
CP 126 PKW
CP 127 60D
CP 128 PKW
CP 129 60D
CP 130 PKW
CP 131 PKW
CP 132 PKW
CP 133 PKW
CP 134 60D
CP 135 60D
CP 136 PKW
CP 137 PKW
CP 138 PKF AP
CP 139 60D
CP 140 PKW
TIE CP 141 FPKW
CP 142 PKW
CP 143 PKW
CP 144 PKW
CP 145 PKW
CP 146 PKW
COORDINATE CONTROL POINTS
POINT
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
NORTHING
2185582.70
2186205.83
2186015.29
2185990.55
2186522.64
2186576.02
2186779.83
2186907.70
2187071.49
2187199.12
2187452.61
2187953.07
2186997.49
2187492.33
2187513.35
2187383.52
2186866.10
2186352.24
2185785.25
2186268.81
2186293.09
2186261.10
2186320.92
2185766.95
2185581.81
2185909.00
2186001.86
EASTING
6216735.01
6216178.85
6216868.82
6217508.22
6217361.06
6217062.14
6216555.70
6216072.56
6215691.59
6215265.36
6215294.34
6215276.17
6217328.08
6217237.81
6217579.43
6217575.79
6217708.31
6217715.66
6217835.64
6218015.44
6218348.60
6218847.50
6221769.30
6217021.76
6216402.66
6216572.62
6216102.39
ELEVATION
637.69
642.98
641.52
643.03
651.77
651.10
654.25
665.99
669.30
672.19
682.06
687.26
654.88
656.12
652.19
653.35
651.24
649.37
643.75
645.15
642.47
633.25
603.48
636.16
640.94
638.64
642.29
DESCRIPTION
CP 147 PKW
CP 148 PKW
CP 149 60D
CP 150 PKW
CP 151 PKW
CP 152 PKW
CP 153 PKW
CP 154 PKW
CP 155 PKW
CP 156 PKW
CP 157 PKW
CP 158 PKW
CP 159 PKW
CP 160 PKW
CP 161 PKW
CP 162 PKW
CP 163 PKWF
CP 164 PKW
CP 165 PKW
CP 166 PKW
CP 167 PKW
CP 168 60D
CP 169 PKWF
CP 170 60D
CP 171 60D
CP 172 60D
CP 173 60D
COORDINATE CONTROL POINTS
POINT
174
175
176
177
178
179
2519
2520
2521
2556
2557
2559
6069
6127
NORTHING
2186332.40
2186550.16
2186158.94
2186240.06
2186177.67
2186440.43
2184458.25
2185482.63
2185905.30
2186364.23
2186795.27
2186701.16
2185810.49
2185853.44
EASTING
6215393.80
6221800.38
6221865.69
6221917.16
6221994.34
6221969.32
6223436.69
6223449.79
6223282.95
6222029.71
6221946.48
6221928.30
6217362.82
6217482.31
ELEVATION
648.18
602.92
604.16
604.76
605.85
607.84
596.52
598.36
598.88
600.72
601.43
604.87
639.90
639.56
DESCRIPTION
CP 174 60D
CP 175 60D
CP 176 60D
CP 177 60D
CP 178 60D
CP 179 PKW
SET 1/2" IP
SET 1/2
SET 1/2
60d N&S_SET
HIGHWAY MONUMENT_FOUND
HPGN
111
109
Digitally signed by Brian W. Avon
Contact Info: Carollo Engineers, Inc.
Date: 2023.04.10 09:19:58-07'00'
REV DATE BY DESCRIPTION
DATE
CHECKED
DRAWN
DESIGNED
8660F.10
JOB NO.
DRAWING NO.
SHEET NO.
SCALES ACCORDINGLY
VERIFY SCALES
THIS SHEET, ADJUST
IF NOT ONE INCH ON
BAR IS ONE INCH ON
ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200
CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 76832
P
lotD
ate: 07-APR
-2023 12:07:31
PM
U
ser:svcPW
Model:
Layout1 C
olorTable:gshade.ctb
D
esignS
cript:
C
arollo_S
td_P
en_v0905.pen
P
lotScale:1:1 LA
S
T
SAVED
B
Y:
PROJECT NO. FILE NAME:
6 GENERAL
8660F10
RECYCLED WATER SERVICE
SCHEDULE
CA
CE
JM
8660F1000G06.dgn
00G06
JG
arretty
METER ID
SERVICE LINE
SIZE (INCHES)
METER SIZE
(INCHES)
CUSTOMER APN STATION
METER BOX 1 METER BOX 2 METER BOX 3
TYP. SIZE LID LABEL TYP. SIZE LID LABEL TYP. SIZE LID LABEL 401 2.0 2 Vinewood Park 145001 B24+13 2.0'' METER 2.0'' PRV & Check - N/A 402 2.0 2 Frank Zeek Elementary School 143026, 102066 B19+70 2.0'' METER 2.0'' PRV & Check - N/A 403 3.0 2 Russian River Cemetery 102050, 102049 A70+68 2.0'' METER 2.0'' PRV & Check - N/A 404 8.0 4 Russian River Cemetery 102063 A87+86 4.0'' STRAINER 4.0'' METER 4.0'' PRV / Check 405 8.0 4 Ukiah High School 102061, 102060, 102074 A89+50 4.0'' STRAINER 4.0'' METER 4.0'' PRV / Check 406 3.0 2 Pomolita Middle School 108111 C16+50 2.0'' METER 2.0'' PRV & Check - N/A 407 3.0 3 Pomolita Middle School 105011, 108105 C24+80 3.0'' STRAINER 3.0'' METER 3.0'' PRV / Check 408 6.0 3 City Golf Course (B9) 102078 C39+30 3.0'' STRAINER 3.0'' METER 3.0'' PRV / Check 409 6.0 3 City Golf Course (B9) 102078 C46+35 3.0'' STRAINER 3.0'' METER 3.0'' PRV / Check 410 6.0 4 City Golf Course (F9) 103001, 109001 C57+00 4.0'' STRAINER 4.0'' METER 4.0'' PRV / Check 411 3.0 3 Todd Grove Park 109002, 114101 C57+30 3.0'' STRAINER 3.0'' METER 3.0'' PRV / Check 412 3.0 2 Anton Stadium (City Park) 113028, 116005, 117101 C68+68 2.0'' METER 2.0'' PRV & Check - N/A 413 1.5 1.5 Anton Stadium (City Park) 116005 C70+40 1.5'' METER 1.5'' PRV & Check - N/A Digitally signed by Brian W. Avon
Contact Info: Carollo Engineers, Inc.
Date: 2023.04.10 09:20:15-07'00'
REV DATE BY DESCRIPTION
DATE
CHECKED
DRAWN
DESIGNED
8660F.10
JOB NO.
DRAWING NO.
SHEET NO.
SCALES ACCORDINGLY
VERIFY SCALES
THIS SHEET, ADJUST
IF NOT ONE INCH ON
BAR IS ONE INCH ON
ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200
CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 76832
P
lotD
ate: 06-APR
-2023 10:24:06
AM
U
ser:svcPW
Model:
Layout1 C
olorTable:gshade.ctb
D
esignS
cript:
C
arollo_S
td_P
en_v0905.pen
P
lotScale:1:1
00G07
LA
S
T
SAVED
B
Y:
PROJECT NO. FILE NAME:
EY
JBB
7 GENERAL
8660F10 8660F1000G07.dgn
DESIGN CRITERIA PIPE SERVICE ABBREVIATIONS PROCESS AREA NUMBERS
DESIGN CRITERIA, PIPE SERVICE ABBREVIATIONS
AND PROCESS AREA NUMBERS
UNITS VALUE
RECYCLED WATER PUMP STATION
QUANTITY EA 4
DUTY - 3 DUTY + 1 STANDBY
TYPE OF PUMPS - SPLIT CASE CENTRIFUGAL
CAPACITY, EA GPM 1,000
TOTAL DYNAMIC HEAD FT 240
DRIVER TYPE - VFD
MOTOR HORSEPOWER, EA HP 100
RECYCLED WATER STORAGE TANK
TOTAL CAPACITY MG 1.5
DIAMETER FT 120
FLOOR ELEVATION FT 595.08
TOP OPERATIONAL WATER LEVEL FT 620.00
OVERFLOW LEVEL FT 620.00
RECYCLED WATER PIPELINES
RESIDUAL PRESSURE AT SERVICE PSI 50
WASTEWATER TREATMENT PLANT FLOW CONDITIONS
AVERAGE DRY WEATHER (ADWF) MGD 3.01
PEAK WEEK DRY WEATHER (PWDWF) MGD 3.40
AVERAGE WET WEATHER (AWWF) MGD 6.89
PEAK WEEK WET WEATHER (PWWWF) MGD 15.8
PEAK HOUR WET WEATHER (PHWWF) MGD 24.5
COAGULANT FEED SYSTEM
COAGULANT - FERRIC CHLORIDE
CONCENTRATION % BY WT 40
PUMP TYPE - DIAPHRAGM
QUANTITY (EXISTING/NEW) EA 2 / 1
CAPACITY, EA GPH 34.2 (E) / 20.4 (E) / 20.4 (N)
MINIMUM DOSAGE mg/L 20
MAXIMUM DOSAGE mg/L 50
MOTOR HORSEPOWER, EA HP 0.5 (E) / 0.5 (E) / 0.5 (N)
ADVANCED WATER TREATMENT (AWT) CLARIFIER/FILTER SYSTEM
AWT CLARIFIER/FILTER UNITS
QUANTITY (EXISTING) EA 4
MINIMUM CAPACITY, EA MGD 1.2
MAXIMUM CAPACITY, EA MGD 2
LENGTH FT 40
WIDTH FT 12
HEIGHT FT 10
CLARIFIER
MINIMUM LOADING, EA GPM/SF 6
MAXIMUM LOADING, EA GPM/SF 10
MEDIA DEPTH IN 48
MEDIA EFFECTIVE SIZE MM 1.5-3
AVERAGE RUN TIME HRS 4
FILTER
MINIMUM LOADING, EA GPM/SF 3
MAXIMUM LOADING, EA GPM/SF 5
MEDIA DEPTH IN 30
BACKWASH GPM/SF 15
AIR WASH BLOWERS
TYPE - POSITIVE DISPLACEMENT
QUANTITY (NEW) EA 3
CAPACITY, EA SCFM 447
MOTOR HORSEPOWER, EA HP 20
PRODUCTION AUGMENTATION UNIT (PAU)
QUANTITY EA 1
CAPACITY, EA MG 5
CAROUSEL PUMP STATION
PUMP TYPE - VERTICAL TURBINE
QUANTITY (EXISTING/NEW) EA 2 / 1
CAPACITY, EA GPM 4000
MOTOR HORSEPOWER, EA HP 40
PAU PUMP STATION
PUMP TYPE - VERTICAL TURBINE
QUANTITY (NEW) EA 1
CAPACITY, EA GPM 1750
MOTOR HORSEPOWER, EA HP 20
PROCESS STREAMS
1W POTABLE WATER
2W NON-POTABLE CITY WATER
3W NO. 3 SPRAY WATER
AA AERATION AIR/AIR WASH
BA BACKWASH AIR
BW BACKWASH WATER
CCI CHLORINE LIQUID
COAG COAGULANT
CLS CHLORINE SOLUTION
CS CIRCULATING SLUDGE
CSO CAUSTIC SODA
D DRAIN
DS DIGESTED SLUDGE
DW DOMESTIC CITY WATER
F FLOAT
FC FERRIC CHLORIDE
FE FINAL EFFLUENT
FM FORCE MAIN
FW FILTERED WATER
HOCL SODIUM HYPOCHLORITE
IA INSTRUMENT AIR
LSG LOW PRESSURE SLUDGE GAS
OF OVERFLOW
PE PRIMARY EFFLUENT
POLY POLYMER
RCW RECLAIMED WATER
RW RECYCLED WATER
SA SERVICE AIR
SBIS SODIUM BISULFITE
SAM SAMPLE
SE SECONDARY EFFLUENT
SH SODIUM HYDROXIDE
SL SLUDGE
STD STORM DRAIN
SW SURFACE WASH
TD TANK DRAIN
THS THICKENED SLUDGE
V VENT
W WATER
WW WASH WATER
AREA DESCRIPTION
00 GENERAL
00 TYPICAL DETAILS
00 SYMBOLS AND ABBREVIATIONS
01 SITE PLAN
02 ELECTRICAL DUCTBANK SECTIONS
02 I&C CONTROL PANELS & NETWORK RACKS
03 ELECTRICAL ONE-LINE DIAGRAMS
03 I&C SCADA BLOCK DIAGRAMS
04 ELECTRICAL SCHEDULES
04 I&C BLOCK DIAGRAMS
05 ELECTRICAL MISC. SCHEDULES
05 I&C FIBER PINOUTS
05 TITLE 24 COMPLIANCE SHEETS
06 I&C CONTROL SCHEMATICS
09 I&C TABLES
60 DECHLORINATION STRUCTURE
75 DIGESTER
80 FILTER FEED PUMP STATION
85 ADVANCED WASTEWATER TREATMENT (AWT)
85 AWT CLARIFIER/FILTER UNITS
87 BACKWASH PUMP STATION
89 CAROUSEL PUMP STATION
91 PAU PUMP STATION
91 PLAN AND PROFILE FOR PAU PIPING
99 METER AND CONTROL VALVE
99 ELECTRICAL BUILDING
99 PLAN AND PROFILE ALIGNMENTS A, B, C
99 RECYCLED WATER PUMP STATION
99 RECYCLED WATER DISTRIBUTION TANK
eparker
JD
Digitally signed by Matthew C. Kallevant
Contact Info: Carollo Engineers, Inc.
Date: 2023.04.07 16:50:30-04'00'
REV DATE BY DESCRIPTION
DATE
CHECKED
DRAWN
DESIGNED
8660F.10
JOB NO.
DRAWING NO.
SHEET NO.
SCALES ACCORDINGLY
VERIFY SCALES
THIS SHEET, ADJUST
IF NOT ONE INCH ON
BAR IS ONE INCH ON
ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200
CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 84405
P
lotD
ate: 06-APR
-2023 10:23:40
AM
U
ser:svcPW
Model:
Layout1 C
olorTable:gshade.ctb
D
esignS
cript:
C
arollo_S
td_P
en_v0905.pen
P
lotScale:1:1
00G08
LA
S
T
SAVED
B
Y:
PROJECT NO. FILE NAME:
EY
JBB
8 GENERAL
8660F10 8660F1000G08.dgn
PUMPS (3)
HYPOCHLORITE
SODIUM
FILTERS
HOCL
TANKS (2)
STORAGE
HYPOCHLORITE
SODIUM
RCW
SEGMENT 1
PIPECONTACTOR
CHLORINE
SEGMENT 2
PIPECONTACTOR
CHLORINE
HO
C
L
PE
M
SE
FE
FC
STORAGE
CHLORIDE
FERRIC
TOTE
POLYMER
W W
NC
FE
NO
PONDS
EVAPORATION/PERCOLATION
FACILITY
DECHLORINATION
SE
TO RUSSIAN RIVER
NO
STORAGE (2)
RECLAIMED WATER
RCW
(2)
STORAGE
FILTER
RCW
BW
FE
PUMPS (2)
BACKWASH
STATION
BACKWASH PUMPING
HOCL
(2)
BASINS
CHLORINE CONTACT
W W
FEED PUMP (2)
BISULFITE
SODIUM
W W
WW
TANKS
STORAGE
BISULFITE
SODIUM
WW
FC
W W
SYSTEM
DISTRIBUTION
WATER
RECLAIMED
TO
MAIN WASTEWATER FLOW
MAIN SOILS FLOW
SIDE STREAM (RECYCLE)
AUXILIARY FLOW
LEGEND
CLARIFIERS
SECONDARY
FROM
CLARIFIERS
SECONDARY
FROM
TO DAFTS
CHANNEL
TANK INFLUENT
GRIT REMOVAL
TO PREAERATION
LIQUIDS PROCESS FLOW DIAGRAM
EXISTING MAIN WASTEWATER FLOW
EXISTING MAIN SOILS FLOW
EXISTING SIDE STREAM (RECYCLE)
EXISTING AUXILIARY FLOW
TRANSFER PUMPS (4)
POLYMER
M
tum
adhay
PUMPS (3)
WATER
RECLAIMED
PUMP STATION
RECLAIMED WATER
STATION
PUMP
CAROUSEL
PUMP (1)
PAU
(PAU)
AUGMENTATION UNIT
PRODUCTION
POND
SOUTH
POND
MIDDLE
POND
NORTH
AWT PUMPS (3)
WELL
WET
AWT
STATION
PUMP
FILTER FEED
CHLORINATION FACILITY
STATION
AWT PUMP
STATION
PAU PUMP
UNITS (4)
CLARIFIER/FILTER
AWT
PUMPS (3)
FILTER FEED
STRUCTURE 80
M
SYSTEM
DISTRIBUTION
WATER
TO RECYCLED
STORAGE PONDS (3)
RECYCLED WATER
STRUCTURE
FLOW DIVERSION
PUMPS (3)
COAGULANT FEED
PUMPS (4)
RECYCLED WATER
FE
JD
Digitally signed by Matthew C. Kallevant
Contact Info: Carollo Engineers, Inc.
Date: 2023.04.07 16:50:36-04'00'
REV DATE BY DESCRIPTION
DATE
CHECKED
DRAWN
DESIGNED
8660F.10
JOB NO.
DRAWING NO.
SHEET NO.
SCALES ACCORDINGLY
VERIFY SCALES
THIS SHEET, ADJUST
IF NOT ONE INCH ON
BAR IS ONE INCH ON
ORIGINAL DRAWING 0 1"
APRIL 2023 OF 200
CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
123456789 10 11 12 13
ABCDEF
123456789 10 11 12 13
ABCDEFG
G
®
No. 84405
Plot Date: 4/6/2023 10:39:57 AM PROJECT NO. LAST SAVED BY: FILE NAME:
EYY
AL/ART
JD
00G09 9
GENERAL
SITE PLAN
8660F1000G09.dwg kjackson 8660F10
BCDEA PRODUCTION AUGMENTATION UNIT (PAU) F DAFT EQUIPMENT BUILDING G DISINFECTION CHEMICAL STORAGE FACILITIES
CAROUSEL PUMP STATION
CHLORINE CONTACT BASINS
DECHLORINATION STRUCTURE
HIJ
AWT FACILITY
CHLORINATION FACILITY
K
DISSOLVED AIR FLOTATION THICKENERS
SLUDGE DRYING BED
DIGESTER
L SLUDGE DEWATERING FACILITY MNO
STORM DRAIN PUMP STATION
BACKWASH PUMP STATION
P
PRIMARY CLARIFIERS
MAINTENANCE BUILDING
Q MECHANICAL EQUIPMENT BUILDING R SOLIDS CONTACT TANKS STU
TRICKLING FILTER
SECONDARY CLARIFIERS
V
WASHWATER RECOVERY POND
POWER GENERATION BUILDING
WXYZ
PERCOLATION PONDS
AWT PUMP STATION
RECLAIMED WATER FILTERS
RECYCLED WATER STORAGE PONDS
AA
PRE-AERATION GRIT REMOVAL TANK & EQUIPMENT
AERATION BLOWER BUILDING
PAU PUMP STATIONS
TRICKLING FILTER PUMP STATION
AB
AC
AD
PROJECT STAGING AREA
VEHICLE AND PEDESTRIAN ACCESS
(NOT AVAILABLE TO CONTRACTOR)
1. SEE ELECTRICAL DRAWINGS FOR ELECTRICAL
ROUTING AND DETAILS.
#
1. PAU INLET.
2. TRUCK FILL HYDRANT (PHASE 3) TO BE REMOVED
AND REPLACED DURING POND CONSTRUCTION.
3. PAU PUMP STATION INLET.
GENERAL NOTES:
KEY NOTES:
LEGEND:
STRUCTURES:
3 2
1 I Y
Z
H
G
FE
D
N
M
AD
A
XXX
C
B
J
U
U
V AB
O
Q
AA
S
R
AC
S
T
T
K
K
L
P
W
SCALE
0 30' 60' 120'
SCALE: 1" = 60'
Know what's below.
Callbefore you dig.
FILE:
PLAN
8660F10C04
Digitally signed by Matthew C. Kallevant
Contact Info: Carollo Engineers, Inc.
Date: 2023.04.07 16:50:41-04'00'
REV DATE BY DESCRIPTION
DATE
CHECKED
DRAWN
DESIGNED
8660F.10
JOB NO.
DRAWING NO.
SHEET NO.
SCALES ACCORDINGLY
VERIFY SCALES
THIS SHEET, ADJUST
IF NOT ONE INCH ON
BAR IS ONE INCH ON
ORIGINAL DRAWING 0 1"
APRIL 2023 OF 200
CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
123456789 10 11 12 13
ABCDEF
123456789 10 11 12 13
ABCDEFG
G
®
No. 84405
PlotDate: 06-APR-2023 11:17:20AM User:svcPW Model:Layout1 ColorTable:gshade.ctb DesignScript:Carollo_Std_Pen_v0905.pen PlotScale:1:1 00D01
LASTSAVED BY:
PROJECT NO. FILE NAME:
BAC
DEMOLITION
8660F10 8660F1000D001.dgn
A NO SCALE
SITE PLAN
R
NOPQRS
BACKWASH PUMP STATION
PRIMARY CLARIFIERS
MAINTENANCE BUILDING
MECHANICAL EQUIPMENT BUILDING
SOLIDS CONTACT TANKS
TRICKLING FILTER
TUV POWER GENERATION BUILDING
WASHWATER RECOVERY POND
SECONDARY CLARIFIER
S
S
TT
V
U
U
Q
O
K
K
L
P
MD
EF
G
C
B
H
I
J
EYY
EXISTING STRUCTURES: ABDEC
SLUDGE LAGOONS
CAROUSEL PUMP STATION
DECHLORINATION STRUCTURE
CHLORINE CONTACT BASINS
DISSOLVED AIR FLOTATION THICKENERS
F DAFT EQUIPMENT BUILDING G DISINFECTION CHEMICAL STORAGE FACILITIES H AWT FACILITY I CHLORINATION FACILITY J SLUDGE DRYING BED K DIGESTER L SLUDGE DEWATERING FACILITY M STORM DRAIN PUMP STATION A
N
Y
XXX
W
WXY
RECYCLED WATER STORAGE PONDS
PERCOLATION PONDS
AWT PUMP STATION
8660F1000D01A
GENERAL NOTES:
PANEL UNLESS OTHERWISE NOTED.
BETWEEN EQUIPMENT AND ITS ASSOCIATED MCC OR CONTROL
REPLACED, DEMOLISH ALL ASSOCIATED CONDUITS AND WIRE
ELECTRICAL AND CONTROL CONDUITS AND WIRES BEING
15. FOR EQUIPMENT BEING DEMOLISHED OR HAVING ITS
DIAMETER AND HEAVILY COMPACT EACH LAYER.
HOLES IN LAYERS WITH THICKNESS NOT EXCEEDING TIE HOLE
SPECIFICATION SECTION 03600. PLACE DRY-PACK MORTAR IN
CONDUIT PENETRATION WITH DRY-PACK MORTAR PER
CONDUITS. GRIND ABANDONED CONDUITS DOWN AND FILL
14. REMOVE CABLES FROM ABANDONED IN-SLAB OR BURIED
RECEPTACLES.
PROTECT EXISTING CONDUITS TO SWITCHES, LIGHTS, AND
13. PROTECT EXISTING RECEPTACLES AND LIGHT SWITCHES.
MCC OR CONTROL PANEL.
BETWEEN THE DEMOLISHED EQUIPMENT AND ITS ASSOCIATED
12. DISCONNECT AND DEMOLISH POWER AND CONTROL WIRING
THAT EQUIPMENT OR PIPE SHALL ALSO REMOVED.
DEMOLISHED OR REMOVED, THE ASSOCIATED SUPPORTS FOR
11. WHERE ANY EQUIPMENT OR PIPING IS CALLED OUT TO BE
SURFACE. PATCH HOLE WITH NON-SHRINK GROUT.
REMOVED, FASTENER SHALL BE CUT OFF 1-INCH BELOW
BRACKETS, PIPE SUPPORTS, BASE PLATES, CLAMPS, ETC ARE
10. UNLESS OTHERWISE INDICATED, WHERE EQUIPMENT,
FACILITIES AS NECESSARY.
REROUTE EARTHEN SWALES AND PROVIDE TEMPORARY
MAINTAIN SITE DRAINAGE PATTERNS DURING CONSTRUCTION.
9. SITE DEMOLITION WILL IMPACT EXISTING DRAINAGE PATTERNS.
DEMOLITION.
CONSTRUCTION THAT IS DAMAGED AS A RESULT OF
8. RESTORE TO ITS PRECONSTRUCTION CONDITION ANY EXISTING THOSE SHOWN ON THE DRAWINGS.
III. CONDITIONS OR DETAILS DIFFERENT FROM
AND COMPONENTS.
II. DAMAGE OR DETERIORATION TO MATERIALS
FROM THE CONTRACT DOCUMENTS.
I. SIZES OR DIMENSIONS DIFFERING
CONSTRUCTION INCLUDING BUT NOT LIMITED TO:
COVERED BY THESE DRAWINGS ARE EXPOSED DURING
b. NOTIFY ENGINEER IMMEDIATELY IF CONDITIONS NOT
SHOP DRAWING PREPARATION, AND FABRICATION.
CONDITIONS RELATED TO WORK PRIOR TO DEMOLITION,
a.FIELD VERIFY ALL EXISTING DIMENSIONS, ELEVATIONS, AND
7. EXISTING CONDITIONS:
RESTRICTIONS PRIOR TO DEMOLITION.
6. REFER TO SPECIFICATION SECTION 01140 FOR WORK
5. SALVAGE EQUIPMENT PER SPECIFICATION SECTION 01738.
REQUIREMENTS OF THE CONTRACT DOCUMENTS.
4. COORDINATE DEMOLITION WORK WITH ALL APPLICABLE
BELOW GRADE PIPING DEMOLITION.
REQUIRED. SEE YARD PIPING DRAWINGS FOR ADDITIONAL
CONTRACT DRAWINGS FOR ADDITIONAL DEMOLITION WORK
SHOWN ON THE DEMOLITION DRAWINGS. SEE OTHER
3. NOT ALL DEMOLITION WORK REQUIRED ON THIS PROJECT IS
AVAILABLE FROM OWNER FOR CONTRACTOR'S REFERENCE.
SATISFY THEMSELVES PER NOTE 1. ORIGINAL DRAWINGS ARE
CONTRACTOR SHALL FIELD VERIFY SITE CONDITIONS TO
PERFORMED AND MAJOR DEVIATIONS HAVE BEEN NOTED.
BE DEMOLISHED. WHERE POSSIBLE, A FIELD VERIFICATION WAS
SCANNING DESIGN DRAWINGS OF THE EXISTING ELEMENT(S) TO
2. THE DEMOLITION DRAWINGS HEREIN HAVE BEEN PRODUCED BY DRAWINGS AVAILABLE FROM THE CITY.
CONTRACTOR IS CAUTIONED TO REVIEW EXISTING REFERENCE
DRAWINGS SHALL BE AT THE CONTRACTOR'S DISCRETION. THE
THEMSELVES AS TO THE FIELD CONDITIONS. THE USE OF THESE
FIELD INVESTIGATIONS AS NECESSARY TO SATISFY
DEMOLITION REQUIRED. THE CONTRACTOR SHALL MAKE SUCH
CONTRACTOR FOR REFERENCE IN DETERMINING THE SCOPE OF
1. THE DEMOLITION DRAWINGS HEREIN ARE PROVIDED TO THE
A
60D01
A
89D01
A
87D01
A
85D01
eparker
A
91D01
JD
10 Digitally signed by Matthew C. Kallevant
Contact Info: Carollo Engineers, Inc.
Date: 2023.04.07 16:55:49-04'00'
REV DATE BY DESCRIPTION
DATE
CHECKED
DRAWN
DESIGNED
8660F.10
JOB NO.
DRAWING NO.
SHEET NO.
SCALES ACCORDINGLY
VERIFY SCALES
THIS SHEET, ADJUST
IF NOT ONE INCH ON
BAR IS ONE INCH ON
ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200
CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 84405
P
lotD
ate: 06-APR
-2023 11:17:10
AM
U
ser:svcPW
Model:
Layout1 C
olorTable:gshade.ctb
D
esignS
cript:
C
arollo_S
td_P
en_v0905.pen
P
lotScale:1:1
60D01
LA
S
T
SAVED
B
Y:
PROJECT NO. FILE NAME:
BAC
DEMOLITION
8660F10 8660F1060D001.dgn
A
2 1
#
GENERAL NOTES:
KEY NOTES:
1. REFER TO GENERAL NOTES ON 00D01.
EYY
DECHLORINATION STRUCTURE
1 2
1 2
EX-24" FE
3/8" = 1'-0"
TO RUSSIAN RIVER
8660F1060M9101
EX-42" FE
FACILITY
CHLORINATION
FROM
EX-24" FE
EX-2" SO2
EX-42" FE
EX-42" FE
3 60D02
PLAN
PUMP STATION
TO CAROUSEL
60D02
60D02
CONDUITS AND LABEL THEM AS SPARE.
DISCONNECT SWITCHES. CAP EXISTING UNDERGROUND
CONDUITS, AND EQUIPMENT STANDS ASSOCIATED WITH
3. DEMOLISH EXISTING DISCONNECTS, EXPOSED
2. INSTALLING NEW VALVE.
NOTIFY ENGINEER OF ANY DEVIATIONS PRIOR TO
TO FIELD VERIFY SIZE AND MATERIAL OF PIPE AND
1. DEMOLISH VALVE. CRITICAL DIMENSION: CONTRACTOR
eparker
3 (STP)
(STP)
CONTACT BASINS
CHLORINE
FROM
JD
11 Digitally signed by Matthew C. Kallevant
Contact Info: Carollo Engineers, Inc.
Date: 2023.04.07 16:55:54-04'00'
REV DATE BY DESCRIPTION
DATE
CHECKED
DRAWN
DESIGNED
8660F.10
JOB NO.
DRAWING NO.
SHEET NO.
SCALES ACCORDINGLY
VERIFY SCALES
THIS SHEET, ADJUST
IF NOT ONE INCH ON
BAR IS ONE INCH ON
ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200
CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 84405
P
lotD
ate: 06-APR
-2023 11:17:38
AM
U
ser:svcPW
Model:
Layout1 C
olorTable:gshade.ctb
D
esignS
cript:
C
arollo_S
td_P
en_v0905.pen
P
lotScale:1:1
60D02
LA
S
T
SAVED
B
Y:
PROJECT NO. FILE NAME:
BAC
DEMOLITION
8660F10 8660F1060D002.dgn
#
GENERAL NOTES:
KEY NOTES:
1 1. REFER TO GENERAL NOTES ON 00D01.
1 EYY
2 2
1 2
tum
adhay
PHOTOS
DECHLORINATION STRUCTURE
3 60D01 60D01
60D01
8660F1060D002A 8660F1060D002C
8660F1060D002B
3 3. DEMOLISH CHLORINE ANALYZER 4.
2. 1. DEMOLISH VALVE.
JD
12 Digitally signed by Matthew C. Kallevant
Contact Info: Carollo Engineers, Inc.
Date: 2023.04.07 16:56:00-04'00'
REV DATE BY DESCRIPTION
DATE
CHECKED
DRAWN
DESIGNED
8660F.10
JOB NO.
DRAWING NO.
SHEET NO.
SCALES ACCORDINGLY
VERIFY SCALES
THIS SHEET, ADJUST
IF NOT ONE INCH ON
BAR IS ONE INCH ON
ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200
CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 84405 85D01
BAC
DEMOLITION
8660F10 8660F1085D001.dgn
A 3/16"=1'-0"
8660F085D01.jpg
2 85D02
1 1
1 1
1 1 1 1 1
85D03
85D02
1 85D03
3 EYY
4 7
8 8
8 5 5 5
85D02
6 7
7 7
5 9
8 8
P
lotD
ate: 06-APR
-2023 11:19:41
AM
U
ser:svcPW
Model:
Layout1 C
olorTable:gshade.ctb
D
esignS
cript:
C
arollo_S
td_P
en_v0905.pen
P
lotScale:1:1 LA
S
T
SAVED
B
Y:
PROJECT NO. FILE NAME:
GENERAL NOTES:
KEY NOTES:
2 5
B
4 1
3 85D02
AWT CLARIFIER/FILTER PLAN
85D03
6 9
eparker
10 FILTER NO. 4 FILTER NO. 3 FILTER NO. 1
FILTER NO. 2
NO. 3
CLARIFIER
NO. 4
CLARIFIER
NO. 2
CLARIFIER
NO. 1
CLARIFIER
1. REFER TO GENERAL NOTES ON 00D01.
#
12 11
85D03
7 13
13 JD
13 14
14 WALL.
14. RESTORE EXISTING PENETRATION TO MATCH EXISTING
SEQUENCING AND 85M02.
SPECIFICATION SECTION 01140 FOR POSSIBLE WORK
BLOWERS HAVE BEEN DEMOLISHED. REFER TO
13. DEMOLISH 6-INCH AIR PIPING AFTER ALL EXISTING
INSTALLED AND ARE FULLY OPERABLE.
ONSITE UNTIL ALL THE NEW BLOWERS HAVE BEEN
12. CONTRACTOR SHALL STORE ONE EXISTING BLOWER
THE AWT CLARIFIER/FILTER UNITS.
ACTUATORS HAVE BEEN REPLACED FOR ALL FOUR OF
REMAIN IN SERVICE UNTIL THE PNEUMATIC WASTE GATE
NEW BLOWERS PER 85M02. AIR COMPRESSOR SHALL
ASSOCIATED PIPING TO FACILITATE INSTALLATION OF
11. TEMPORARILY RELOCATE AIR COMPRESSOR AND
INDICATED ON 85M02.
10. REPLACE EXISTING 6-INCH ELBOW WITH A TEE AS
PERMANENT BLIND FLANGE.
PIPE FLUSH WITH EXISTING GRADE AND PROVIDE
9. EXISTING 4" SW PIPE TO BE ABANDONED N PLACE. CUT
AND ASSOCIATED PIPING AND SUPPORTS.
8. DEMOLISH THE SURFACE WASH SWEEPS (TYPICAL OF 12)
7. REMOVE ADSORPTION CLARIFIER MEDIA.
6/85D03. OTHER WASTE GATES NOT SHOWN FOR CLARITY.
ON EACH AWT CLARIFIER/FILTER UNIT. REFER TO PHOTO
6. DEMOLISH EXISTING PNEUMATIC WASTE GATE ACTUATOR
5. REMOVE FILTER MEDIA AND FILTER GRAVEL SUPPORT.
4. DEMOLISH AIR PIPING AND SUPPORTS.
3. DEMOLISH PRIMARY COAGULANT FEED PUMP.
2. DEMOLISH AIR BLOWER.
1. DEMOLISH VALVES.
Digitally signed by Matthew C. Kallevant
Contact Info: Carollo Engineers, Inc.
Date: 2023.04.07 16:56:05-04'00'
REV DATE BY DESCRIPTION
DATE
CHECKED
DRAWN
DESIGNED
8660F.10
JOB NO.
DRAWING NO.
SHEET NO.
SCALES ACCORDINGLY
VERIFY SCALES
THIS SHEET, ADJUST
IF NOT ONE INCH ON
BAR IS ONE INCH ON
ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200
CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 84405
P
lotD
ate: 06-APR
-2023 11:17:11
AM
U
ser:svcPW
Model:
Layout1 C
olorTable:gshade.ctb
D
esignS
cript:
C
arollo_S
td_P
en_v0905.pen
P
lotScale:1:1
85D02
LA
S
T
SAVED
B
Y:
PROJECT NO. FILE NAME:
BAC
DEMOLITION
8660F10 8660F1085D002.dgn
1 #
GENERAL NOTES:
KEY NOTES:
1 B
85D01
1 2 3
85D01 85D01
85D01
1 3
2 2
SECTION AND PHOTOS
1. REFER TO GENERAL NOTES ON 00D01.
NO SCALE
EYY
5 4
4 6
8660F1085D02A 8660F1085D02B
8660F1085D02C 8660F1085D02D
tum
adhay
7 4
2 2
WITH EXISTING GRADE AND PROVIDE PERMANENT BLIND FLANGE.
7. EXISTING 4" SW PIPE TO BE ABANDONED IN PLACE. CUT PIPE FLUSH PIPING AND SUPPORTS.
6. DEMOLISH SURFACE WASH SYSTEM EQUIPMENT AND ASSOCIATED BLOWERS.
5. DEMOLISH EXISTING LOCAL CONTROL PANEL FOR TWO AIR
AND FOUR SOLENOID VALVES.
BLOWER, EIGHT FILTER VALVES, AND FOUR AIR SCOUR VALVES, SOURCE TO EQUIPMENT LOCATION. THIS IS TYPICAL FOR TWO AIR
ASSOCIATED WITH DEMO EQUIPMENT FROM POWER AND CONTROL
4. DEMOLISH EXISTING EXPOSED CONDUITS AND ALL CONDUCTORS FOR FILTERS.
3. DEMOLISH SOLENOID VALVE. TYPICAL OF FOUR SOLENOID VALVES
2. DEMOLISH AIR BLOWER AND ASSOCIATED PIPING AND SUPPORTS.
1. DEMOLISH VALVE. TYPICAL OF EIGHT VALVES FOR THE FILTERS.
AWT CLARIFIER/FILTER
JD
14 Digitally signed by Matthew C. Kallevant
Contact Info: Carollo Engineers, Inc.
Date: 2023.04.07 16:56:11-04'00'
REV DATE BY DESCRIPTION
DATE
CHECKED
DRAWN
DESIGNED
8660F.10
JOB NO.
DRAWING NO.
SHEET NO.
SCALES ACCORDINGLY
VERIFY SCALES
THIS SHEET, ADJUST
IF NOT ONE INCH ON
BAR IS ONE INCH ON
ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200
CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 84405
P
lotD
ate: 06-APR
-2023 11:18:43
AM
U
ser:svcPW
Model:
Layout1 C
olorTable:gshade.ctb
D
esignS
cript:
C
arollo_S
td_P
en_v0905.pen
P
lotScale:1:1
85D03
LA
S
T
SAVED
B
Y:
PROJECT NO. FILE NAME:
BAC
DEMOLITION
8660F10 8660F1085D003.dgn
#
GENERAL NOTES:
KEY NOTES:
PHOTOS
5 8660F1085D03-5
85D01
2 1
1 1. REFER TO GENERAL NOTES ON 00D01
EYY
3 AWT CLARIFIER/FILTER
4 5
4 8660F1085D03-4
85D01
6 85D01
8660F1085D03C
6 7
85D01
EXISTING PLC-3 PANEL ELEVATION EXTERIOR
8660F1085D03D
7 eparker
8 SURFACE WASH SWEEPS.
8. DEMOLISH PIPING AND SUPPORTS ASSOCIATED WITH THE
SECTION 11802 AND CONTRACT DRAWINGS.
BE REPLACED WITH VCP-3 AS SPECIFIED IN SPECIFICATION
ALL COMPONENTS TO THE OWNER. EXISTING PLC-3 PANEL SHALL
7. DEMOLISH THE EXISTING PLC-3 PANEL. SALVAGE AND TURN OVER
6. DEMOLISH PORTION OF AIR WASH LINE.
CLARIFIER/FILTER UNITS.
TO SPECIFICATION SECTION 11802. TYPICAL OF AWT
5. DEMOLISH EXISTING PNEUMATIC RAM OF WASTE GATES. REFER CONTROLLER INSTALLATION.
EXISTING CONDUCTORS AND CONDUITS IN PLACE FOR NEW
4. DEMOLISH COAGULANT FEED PUMP CONTROLLER UNIT. PROTECT FOR CLARIFIERS.
CONTROL SOURCE TO EQUIPMENT LOCATION. THIS IS TYPICAL
ASSOCIATED WITH DEMO EQUIPMENT FROM POWER AND
3. DEMOLISH EXISTING EXPOSED CONDUITS AND ALL CONDUCTORS AND CONTROL CONDUCTORS IN PLACE.
2. DEMOLISH COAGULANT FEED PUMP. PROTECT EXISTING POWER CLARIFIERS.
1. DEMOLISH VALVE. TYPICAL OF EIGHT VALVES FOR THE
JD
15 Digitally signed by Matthew C. Kallevant
Contact Info: Carollo Engineers, Inc.
Date: 2023.04.07 16:56:16-04'00'
REV DATE BY DESCRIPTION
DATE
CHECKED
DRAWN
DESIGNED
8660F.10
JOB NO.
DRAWING NO.
SHEET NO.
SCALES ACCORDINGLY
VERIFY SCALES
THIS SHEET, ADJUST
IF NOT ONE INCH ON
BAR IS ONE INCH ON
ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200
CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 84405
P
lotD
ate: 06-APR
-2023 11:18:04
AM
U
ser:svcPW
Model:
Layout1 C
olorTable:gshade.ctb
D
esignS
cript:
C
arollo_S
td_P
en_v0905.pen
P
lotScale:1:1
87D01
LA
S
T
SAVED
B
Y:
PROJECT NO. FILE NAME:
BAC
DEMOLITION
8660F10 8660F1087D001.dgn
A
2 BACKWASH PUMP STATION
NO SCALE
EB
1 tum
adhay
PLAN
1 #
GENERAL NOTES:
KEY NOTES:
1. REFER TO GENERAL NOTES ON 00D01.
8660F1087D01A
1 -
8660F1087D01B
2 -
8660F1087D01C
2 -
-
1 2
3 EX - 1" FE
EX - 1 1/2" FE
EX - 1 1/2" FE
EX - 3/4" FE
(PVC)
(PVC)
4 (PVC)
(PVC)
ON 87M01.
5. REMOVE, PROTECT, AND REINSTALL BUTTERFLY VALVE AS SHOWN PLACE FOR NEW ANALYZER INSTALLATION.
4. PROTECT SIGNAL AND POWER CONDUCTORS AND CONDUITS IN
3. DEMOLISH EXISTING SURFACE WASH PUMP.
ENCLOSURE IN PLACE.
2. DEMOLISH CHLORINE ANALYZER 3. PROTECT THE EXISTING
1. DEMOLISH SAMPLE PUMP 3.
5 JD
16 Digitally signed by Matthew C. Kallevant
Contact Info: Carollo Engineers, Inc.
Date: 2023.04.07 16:56:22-04'00'
REV DATE BY DESCRIPTION
DATE
CHECKED
DRAWN
DESIGNED
8660F.10
JOB NO.
DRAWING NO.
SHEET NO.
SCALES ACCORDINGLY
VERIFY SCALES
THIS SHEET, ADJUST
IF NOT ONE INCH ON
BAR IS ONE INCH ON
ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200
CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 84405
P
lotD
ate: 06-APR
-2023 11:17:39
AM
U
ser:svcPW
Model:
Layout1 C
olorTable:gshade.ctb
D
esignS
cript:
C
arollo_S
td_P
en_v0905.pen
P
lotScale:1:1
89D01
LA
S
T
SAVED
B
Y:
PROJECT NO. FILE NAME:
BAC
DEMOLITION
8660F10 8660F1089D001.dgn
A
8660F002D01.jpg
1 2
CAROUSEL PUMP STATION
NO SCALE
EB
TRF-3E
1 89D02
PLAN
89D02
5 2
3 4
#
GENERAL NOTES:
KEY NOTES:
1. REFER TO GENERAL NOTES ON 00D01.
eparker
DRAWINGS FOR SPECIFIC REQUIREMENTS.
5. DEMOLISH 1 KVA, 480 V TRANSFORMER. REFER TO ELECTRICAL
4. REMOVE EXISTING MOTOR OF EFFLUENT PUMP.
ELECTRICAL DRAWINGS FOR SPECIFIC REQUIREMENTS.
3. DEMOLISH MAIN DISCONNECT SWITCH 200 A, 3-POLE. REFER TO DRAWINGS FOR SPECIFIC REQUIREMENTS.
2. DEMOLISH MOTOR CONTROL CABINET. REFER TO ELECTRICAL
1. DEMOLISH EFFLUENT PUMP.
JD
17 Digitally signed by Matthew C. Kallevant
Contact Info: Carollo Engineers, Inc.
Date: 2023.04.07 16:56:28-04'00'
REV DATE BY DESCRIPTION
DATE
CHECKED
DRAWN
DESIGNED
8660F.10
JOB NO.
DRAWING NO.
SHEET NO.
SCALES ACCORDINGLY
VERIFY SCALES
THIS SHEET, ADJUST
IF NOT ONE INCH ON
BAR IS ONE INCH ON
ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200
CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 84405
P
lotD
ate: 06-APR
-2023 11:17:43
AM
U
ser:svcPW
Model:
Layout1 C
olorTable:gshade.ctb
D
esignS
cript:
C
arollo_S
td_P
en_v0905.pen
P
lotScale:1:1
89D02
LA
S
T
SAVED
B
Y:
PROJECT NO. FILE NAME:
BAC
DEMOLITION
8660F10
CAROUSEL PUMP STATION
EB
#
GENERAL NOTES:
KEY NOTES:
INFORMATION.
DIAGRAM FOR MORE ELECTRICAL DEMOLITION
2. REFER TO CAROUSEL PUMP STATION DEMO ONE-LINE
1. REFER TO GENERAL NOTES ON 00D01.
2 1
2 8660F1002D01-1.JPG
89D01
5 6
2 4
2 1
8660F1002D01-3.JPG
89D01
PHOTOS
8660F1089D002.dgn
6. DEMOLISH MAIN DISCONNECT SWITCH 200 A, 3-POLE.
5. DEMOLISH 1 KVA, 480 V TRANSFORMER.
4. DEMOLISH MOTOR CONTROL CABINET.
PUMP IN PLACE FOR NEW MOTOR INSTALLATION.
3. DEMOLISH EXISTING MOTOR OF EFFLUENT PUMPS. PROTECT
CONTROL SOURCE TO EQUIPMENT LOCATION.
ASSOCIATED WITH DEMO EQUIPMENT FROM POWER AND
2. DEMOLISH EXISTING EXPOSED CONDUITS AND ALL CONDUCTORS
1. DEMOLISH EFFLUENT PUMP.
3 JD
18 eparker
Digitally signed by Matthew C. Kallevant
Contact Info: Carollo Engineers, Inc.
Date: 2023.04.07 16:56:34-04'00'
REV DATE BY DESCRIPTION
DATE
CHECKED
DRAWN
DESIGNED
8660F.10
JOB NO.
DRAWING NO.
SHEET NO.
SCALES ACCORDINGLY
VERIFY SCALES
THIS SHEET, ADJUST
IF NOT ONE INCH ON
BAR IS ONE INCH ON
ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200
CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 76832
P
lotD
ate: 07-APR
-2023
2:04:14
PM
U
ser:svcPW
Model:
Layout1 C
olorTable:gshade.ctb
D
esignS
cript:
C
arollo_S
td_P
en_v0905.pen
P
lotScale:1:1
91D01
LA
S
T
SAVED
B
Y:
PROJECT NO. FILE NAME:
BAC
DEMOLITION
8660F10 8660F1091D001.dgn
A
1 #
GENERAL NOTES:
KEY NOTES:
SLUDGE LAGOON
PLAN
8660F1000D01.jpg
NO SCALE
1. REFER TO GENERAL NOTES ON 00D01.
CA
2 3
3. REGRADE EXISTING POND AREA PER DRAWING 91C01.
2. REMOVED EXISTING SLUDGE PIPING.
1. DEMOLISH CENTER BERM.
JM
19 JG
arretty
Digitally signed by Brian W. Avon
Contact Info: Carollo Engineers, Inc.
Date: 2023.04.10 09:26:48-07'00'
CONTROL POINT
SYMBOLS
EXISTING MONUMENT
EXISTING CONTROL POINT
SYMBOL DESCRIPTION
FLOW/SLOPE
DIRECTION
MANHOLE (PROFILE)
MANHOLE (PLAN)
PULL BOX
POWER TOWER
SYMBOL DESCRIPTION
ROCK WALL
HEADWALL
CABLE TV
UTILITY POLE
UTILITY POLE GUY WIRE
COORDINATES
SLOPE CALLOUT
GUARD POST
CONTROL POINT
2 1
X 1325.00
PT
RADIUS
ANGLE
CLOCKWISE
PC
P
CTV
PH
SHRUB/HEDGE
TREE
T TELEPHONE PEDESTAL
CO
CLEANOUT
LIGHT
PP
POWER POLE
SIGN/SIGN POST
ELECTRICAL MANHOLE
AND PULL BOX
GATE
LINE WORK
EDGE OF PVMT OR
OUTSIDE FACE OF
CURB
CXX
SPOT ELEVATION
EXISTING SPOT ELEVATION
2:1
XX
N=XXXXXX.XX
E=XXXXXX.XX
N=1600000 E=1000000
2.0%
FIRE HYDRANT
CATCH BASIN
E
POTHOLE
POTHOLE NUMBER
SHORING /\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\/\
FLOWLINE
GUARDRAIL
NEW ROAD
EXISTING CONTOURS (SCREENED)
NEW FENCE
POWER POLE & LINE
EXISTING FENCE (SCREENED)
EXISTING ROAD (SCREENED)
PROPERTY LINE OR RIGHT OF WAY
REMOVE OR ABANDONED (CROSS
HATCHING: FENCE SHOWN AS EXAMPLE)
SLOPE
EXISTING PIPING (TRIPLE LINES) (SCREENED)
NEW PIPING (SINGLE LINE)
NEW PIPING (TRIPLE LINES)
EXISTING STRUCTURES (SCREENED)
EXISTING PIPING (SINGLE LINE)(SCREENED)
CENTER, MONUMENT, OR SURVEY LINE
PP
X X
X X
OHE OHE
CABLE TV (UNDERGROUND) CTV CTV
FIBER OPTIC
NATURAL GAS G G
SANITARY SEWER
STORM DRAIN
310
310
NEW STRUCTURES OR EDGE OF PAVEMENT
FUTURE ROAD, WATER EDGE OR RIDGE
HIDDEN LINE OR TRAIL EDGE
FO FO
UNDERGROUND ELECTRIC
RAILROAD TRACKS
FUEL
TELEPHONE
WATER
NEW CONTOURS
SILT FENCE SF SF SF
EASEMENT
EXISTING EASEMENT
CITY LIMITS
EXISTING GRADE (PROFILE)
PROPOSED GRADE (PROFILE)
CURB
CURB & GUTTER
HATCH PATTERNS
SWALE
S=0.0020
M METER BOX
NOTE: ALL SYMBOLS SHOWN AS NEW.
EXISTING SYMBOLS ARE SCREENED.
COORDINATES / ELEVATION
ROADWAY / PIPE CURVES
ROADWAY / PIPE CURVE
(SEE TABLE ON EACH
PAVING AND GRADING OR
CIVIL PIPING DWG WITH
ROADWAY / PIPE CURVES.)
LOC LOC
SECTION CUT
TYPICAL DETAIL
REFERENCE
EXTERIOR ELEVATION
VIEWS
PHOTO LOCATION
GRID BUBBLE
PLAN/TITLE
SECTION OR DETAIL
TITLE W/ REFERENCE
DETAIL CALL-OUT
(ENLARGED)
ARROW INDICATES
POINT OF VIEW
DRAWING REFERENCE ##X##
PLAN NOT REFERENCED
DETAIL REFERENCES
SYMBOL DESCRIPTION
REVISION DELTA
SCALE
KEY NOTE
BREAK LINE
ELEVATION
TOC XXXX.XX
EXISTING ELEVATION
PIPE BREAK
PLAN VIEW
PIPE BREAK
CROSS SECTION
PIPE CONTINUATION
(SINGLE LINE)
BRACKET
EX TOW XXXX.X±
UNDERGROUND/
OVERHEAD
WARNING
(STATE/REGION
SPECIFIC)
NORTH ARROW/
PLANT NORTH
EQUIPMENT/DEVICE
KEY TAG
PIPE TAG
VIEW
AREA DESIGNATOR
(WHEN APPLICABLE)
DISCIPLINE DESIGNATOR
CONSECUTIVE
SHEET NUMBER
TYPICAL DETAIL TITLE
SHEETS IN
DETAIL
MODIFICATION NOTE
S = STANDARD
J = JOB SPECIFIC
R = REVISED
N = NOTE TO TYPICAL DETAIL USER
DATE CREATED
(REVISED)
LENGTH
CURVE NUMBER
RADIUS POINT
XX
*
FUTURE PIPING
(WHERE APPLICABLE)
FUTURE
* FOR EXISTING PIPING SHOW AS
EX SIZE FLOW STREAM
UGE UGE
F F
SS SS
SD SD
TEL TEL
W W
FORCEMAIN SANITARY SEWER FM FM
BURIED VALVE
PIPE CAP OR
CONNECTION
CHECK VALVE
FLANGE
PLUG VALVE
REDUCER
AIR RELEASE VALVE
BLOW OFF VALVE
SERVICE CONNECTION
HOSE BIBB / YARD HYDRANT
BALL VALVE
GATE VALVE
BUTTERFLY VALVE
LIMITS OF CONSTRUCTION
##X##
1 SEE INDICATED
DRAWING
VIEW
DRAWING CUT ORIGINATION
ALPHA = SECTION
NUMERIC = DETAIL
PHX
SOIL BORING LOCATIONS
B-XX
XX
EQUIPMENT/DEVICE
NUMBER
STAGING AREA
CLSM
TREAD PLATE
AGGREGATE
BASE COURSE
(ABC)
ASPHALT PAVING
GRATING
BEDROCK
CONCRETE
(ALL CLASSES)
DRAIN ROCK
GRAVEL
RIPRAP
EXISTING/
UNDISTURBED
SOIL
STRUCTURAL
FILL OR BACKFILL
STEEL
LANDSCAPING
OR
(WITH AERIAL)
SPAN
SCALE:
FILE:
PLAN
DESCRIPTION
FILE
A SCALE
VIEW TITLE
A
##X##
- = SHOWN ON SAME DRAWING
##X## = SEE INDICATED DRAWING
VIEW
SCALE:
FILE:
C/1 ELEVATION
##X## SCALE
FILE
DESCRIPTION
VIEW TITLE
TYP
?
TYPICAL DETAIL #
#
-
##X##
A
A
1 TYP
SHT OF XX/XX/20XX XX
LINE 3
LINE 2
S
? LINE 1
TYPICAL DETAIL #
34 1
XXX-XX-XXX
0 10' 20' 40'
SCALE: 1" = 20'
2 MATCH LINE MATCH LINE STA XXX SEE DWG XXX
X" XXX
PIPE SIZE
FLOW STREAM
30.0°
NORTH
TRUE
PLANT
NORTH
XX.XX
ANY SPECIFIC DESIGNATIONS
NOTED WILL NEED TO REFER TO
ABBREVIATIONS
PROJECT NO.
LAST SAVED BY:
FILE NAME:
Plot Date:
CDA
JRD
JM
00C01
20 CIVIL
GENERAL CIVIL LEGEND AND SYMBOLS
8660F1000C01.dwg
gdavis
8660F10
10/5/2022 11:08:46 AM
usanorth811.org
REV DATE BY DESCRIPTION
DATE
CHECKED
DRAWN
DESIGNED
8660F.10
JOB NO.
DRAWING NO.
SHEET NO.
SCALES ACCORDINGLY
VERIFY SCALES
THIS SHEET, ADJUST
IF NOT ONE INCH ON
BAR IS ONE INCH ON
ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200
CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 76832
Digitally signed by Brian W. Avon
Contact Info: Carollo Engineers, Inc.
Date: 2023.04.10 09:13:25-07'00'
REV DATE BY DESCRIPTION
DATE
CHECKED
DRAWN
DESIGNED
8660F.10
JOB NO.
DRAWING NO.
SHEET NO.
SCALES ACCORDINGLY
VERIFY SCALES
THIS SHEET, ADJUST
IF NOT ONE INCH ON
BAR IS ONE INCH ON
ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200
CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 76832
SCHEDULES
GENERAL PIPELINE NOTES:
NOTES
1. DIMENSIONS TO STRUCTURES, REFERENCED PIPING, PAVING, AND OTHER IMPROVEMENTS IS APPROXIMATE. THE CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AND CONDITIONS 14 DAYS IN ADVANCE OF THE CONSTRUCTION PROGRESS. THE CONTRACTOR SHALL REPORT ANY
DISCREPANCIES TO THE ENGINEER.
2. CONTRACTOR SHALL MAINTAIN A MINIMUM CLEARANCE OF 10 FEET HORIZONTAL AND 3 FEET VERTICAL BETWEEN THE SEWER LINES AND EXISTING WATER LINES.
3. REFER TO THE GEOTECHNICAL REPORT LOCATED IN THE APPENDIX OF
THE SPECIFICATIONS FOR ADDITIONAL INFORMATION ON THE
GEOTECHNICAL CONDITIONS AND BORING INFORMATION.
4. IN ALL LOCATIONS WHERE TRENCH PLATE IS USED FOR VEHICULAR OR
PEDESTRIAN TRAFFIC, THE CONTRACTOR SHALL APPLY SKID RESISTANT
COATING ON THE TRENCH PLATES AND COLD MIX ASPHALT CONCRETE AT THE EDGES. THE TRENCH PLATES SHALL BE NOTCHED INTO THE ASPHALT,
CONCRETE, OR TRAVELED SURFACE TO PREVENT SLIPPAGE AND ROCKING UNDER TRAFFIC.
5. THE CONTRACTOR SHALL MAINTAIN ACCESS TO ALL PROPERTIES ADJACENT TO THE WORK, THROUGHOUT THE CONSTRUCTION PERIOD.
6. ALL OPEN TRENCHES, WORK AREAS AND SHAFTS SHALL HAVE A SHORING SYSTEM IN ACCORDANCE WITH OSHA, STATE AND LOCAL REQUIREMENTS.
7. THE CONTRACTOR SHALL COMPLY WITH ALL FEDERAL, STATE, COUNTY,
AND LOCAL LAWS AND ORDINANCES RELATING TO THE SAFETY AND CHARACTER OF WORK, EQUIPMENT AND PERSONNEL. THIS INCLUDES BUT
IS NOT LIMITED TO SHEETING, SHORING, BRACING, VENTILATION,
CONFORMANCE WITH TRAFFIC CONTROL AND MAINTENANCE OF
BARRICADES AND WARNING DEVICES.
8. LAYOUT DRAWINGS ARE REQUIRED FOR PIPING INSTALLED.
9. ALL ROAD DITCHES, FENCE LINES, PASTURES AND SIMILAR AREAS SHALL BE RESTORED PER SPECIFICATION 02952.
10. ALL CROPPED AREAS DISTURBED SHALL HAVE THE TOPSOIL REPLACED AND THE ENTIRE AREA DISTURBED SHALL BE RIPPED 2 FT DEEP PER THE LAND OWNERS REQUIREMENTS.
11. CONTRACTOR SHALL TAKE ALL PRACTICAL PRECAUTIONS TO MINIMIZE DISTURBANCES TO STREAMS, VEGETATION, TREES AND CROP LANDS.
WHEREVER PRACTICAL LEAVE EXISTING TREES AND VEGETATED AREAS UNDISTURBED.
UTILITY NOTES:
EARTHWORK NOTES:
1. CLEAR THE CONSTRUCTION AREA OF NATURAL OBSTRUCTIONS EXISTING
FOUNDATIONS, BUILDINGS, FENCES, LUMBER, WALLS, STUMPS, BRUSH,
WEEDS, RUBBISH, TREES, BOULDERS, AND ANY OTHER ITEMS WHICH
INTERFERES WITH CONSTRUCTION OPERATIONS OR ARE DESIGNATED FOR REMOVAL.
2. GRUB OUT AND DISPOSE OF TREE TRUNKS AND ROOT MATERIAL BELOW THE GROUND SURFACE REMAINING AFTER CLEARING.
3. DISPOSE OF THE UNACCEPTABLE BACKFILL MATERIAL FROM THE CLEARING AND GRUBBING OPERATIONS AT NO ADDITIONAL COST TO THE OWNER.
4. STRIP AND STOCKPILE THE TOPSOIL. THE DEPTH OF STRIPPING SHALL BE ESTIMATED TO BE 12-INCHES BUT WILL BE DETERMINED IN THE FIELD AS SOIL CONDITIONS DICTATE.
5. REPLACE STOCKPILED SOIL AND RESTORE SITE AS SPECIFIED.
6. ROCK AND AGGREGATE STORAGE AREAS SHALL BE RESTORED BY
EXCAVATING ANY SOILS CONTAINING ROCK OR AGGREGATE AND
BACKFILLING WITH TOPSOIL. SOIL REMOVED MAY BE USED FOR TRENCH BACKFILL ABOVE THE PIPE ZONE AND 3 FEET BELOW FINISHED GRADE.
1. EXISTING UTILITIES IN THE PROJECT MAY BE IN A FRAGILE CONDITION. THE
CONTRACTOR SHALL EXERCISE NECESSARY CAUTION WHEN WORKING NEAR EXISTING UTILITIES.
2. PLAN LOCATIONS AND ELEVATIONS OF EXISTING UTILITIES ARE BASED ON
RECORD DRAWINGS, POTHOLING AND SURVEY INFORMATION AND ARE CONSIDERED APPROXIMATE ONLY. WHERE NO ELEVATIONS ARE SHOWN, NO INFORMATION WAS AVAILABLE DURING THE DESIGN PERIOD.
3. SOME UTILITY SERVICES MAY NOT BE SHOWN ON THESE DRAWINGS. THE
CONTRACTOR SHALL TAKE NECESSARY MEASURES TO LOCATE AND
PROTECT SERVICE DURING CONSTRUCTION.
4. CONTRACTOR SHALL CALL THE "LOCAL UTILITY LOCATOR" AT 1-800-277-2600 PRIOR TO ANY EXCAVATION ACTIVITIES.
5. THE LOCATION, SIZE, AND MATERIALS OF EXISTING UNDERGROUND
UTILITIES SHOWN ON THESE DRAWINGS ARE APPROXIMATE AND IS SHOWN FOR BIDDING PURPOSES. THE CONTRACTOR SHALL BE RESPONSIBLE TO
CONTACT THE UTILITY OWNERS SO THAT THOSE UTILITIES MAY MARK THE LOCATION OF THEIR UTILITIES PRIOR TO ANY EXCAVATION ACTIVITIES. THE
CONTRACTOR SHALL BE RESPONSIBLE TO LOCATE AND PROTECT EXISTING UTILITIES.
GENERAL NOTES:
1. FOLLOWING NOTES ARE GENERAL AND APPLY TO ALL SHEETS OF THESE CONTRACT DOCUMENTS AS IF THEY WERE WRITTEN IN THEIR ENTIRETY ON EACH SHEET.
2. CONTRACTOR SHALL VERIFY ALL DIMENSIONS BEFORE STARTING WORK AND SHALL IMMEDIATELY NOTIFY THE ENGINEER OF ANY DISCREPANCIES. CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD
VERIFYING ALL EXISTING CONDITIONS INCLUDING LOCATION AND DIMENSIONS OF ALL EXISTING CONSTRUCTION AND UTILITIES. CONTRACTOR SHALL NOTIFY ENGINEER IF THERE IS A CONFLICT
BETWEEN THE CONTRACT DOCUMENTS AND EXISTING CONSTRUCTION BEFORE PROCEEDING WITH WORK.
3. UNLESS DETAILED, SPECIFIED, OR OTHERWISE INDICATED ON THE DRAWINGS, CONSTRUCTION SHALL BE AS INDICATED IN THE APPLICABLE TYPICAL DETAILS AND GENERAL NOTES. TYPICAL DETAILS SHALL APPLY EVEN THOUGH NOT REFERENCED AT SPECIFIC LOCATIONS ON DRAWINGS.
4. WHERE NO CONSTRUCTION DETAILS ARE SHOWN OR NOTED FOR ANY PART OF WORK. DETAILS SHALL BE IN THE SAME AS FOR OTHER SIMILAR WORK.
5. CONTRACTOR SHALL COMPLY WITH LOCAL CONSTRUCTION STORM WATER DISCHARGE REGULATIONS AND REQUIREMENTS.
6. PRIOR TO EXCAVATION FOR NEW STRUCTURES, ELECTRICAL CONDUIT, FABRICATION OF NEW PIPING
AND/OR OTHER PROPOSED UTILITIES, CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION OF ALL EXISTING PIPING AND UTILITIES IN THE CONSTRUCTION AREA. THE CONTRACTOR
SHALL TEMPORARILY RELOCATE CONFLICTING EXISTING UTILITIES AT TIE-IN/CONNECTION LOCATIONS
AND REINSTALL THEM AS REQUIRED TO ELIMINATE THE CONFLICT AT NO ADDITIONAL COST TO THE OWNER.
7. ALL PIPELINES 12" AND LARGER SHALL HAVE A MINIMUM COVER OF 36" UNLESS THE COVER DEPTH IS SPECIFICALLY INDICATED ON THE DRAWINGS. PIPE SMALLER THAN 12" SHALL HAVE A MINIMUM COVER OF 30" UNLESS NOTED OTHERWISE. PIPES SHALL BE ROUTED AS SHOWN UNLESS MINOR REVISIONS ARE NECESSARY TO MISS EXISTING PIPES, STRUCTURES, ETC. CONTRACTOR SHALL BE RESPONSIBLE
FOR FURNISHING ALL FITTINGS AND ADAPTERS REQUIRED TO MAKE THE ROUTING CHANGES AT NO ADDITIONAL COST TO THE OWNER. CONTRACTOR SHALL INCLUDE COST FOR THIS IN THE BID.
8. EXISTING FACILITY AND UTILITY INFORMATION SHOWN ON THE DRAWINGS WAS OBTAINED FROM AVAILABLE RECORDS OR ELECTRONIC FILES. NEITHER THE OWNER NOR ENGINEER ASSUMES ANY RESPONSIBILITY FOR FACILITIES AND UTILITIES NOT SHOWN OR NOT IN THE LOCATION SHOWN. THE
CONTRACTOR SHALL FIELD VERIFY ALL LOCATIONS, SIZES, MATERIAL TYPES, AND ELEVATIONS SHOWN AROUND OR NEAR AREAS OF NEW CONSTRUCTION PRIOR TO START OF CONSTRUCTION.
9. THE CONTRACTOR SHALL TAKE ALL PRECAUTIONARY MEASURES NECESSARY TO PROTECT FROM DAMAGE EXISTING FACILITIES AND UTILITIES SHOWN OR NOT SHOWN THAT ARE TO REMAIN IN PLACE.
ALL FACILITIES DAMAGED BY THE CONTRACTOR'S OPERATIONS SHALL BE EXPEDITIOUSLY REPAIRED
OR RECONSTRUCTED TO THE ORIGINAL OR BETTER CONDITION AT THE CONTRACTOR'S EXPENSE WITHOUT ADDITIONAL COMPENSATION.
10. CONTRACTOR SHALL MAKE CONNECTIONS TO EXISTING PIPE, EQUIPMENT, ETC. AS REQUIRED AND
SHALL PROVIDE ALL FITTINGS, ADAPTERS, AND APPURTENANCES REQUIRED TO MAKE THE CONNECTIONS. PROVIDE ALL SUPPORTS REQUIRED FOR A RIGIDLY SUPPORTED COMPLETE AND WORKING SYSTEM.
11. ADJUST ALL VALVE BOXES, VAULTS, PULL BOXES, AND MANHOLES TO FINISHED GRADE UNLESS OTHERWISE SHOWN OR DIRECTED. MANHOLES IN OPEN FIELDS SHALL BE SET TWELVE INCHES ABOVE FINISHED GRADE AND VAULTS SHALL BE SIX INCHES ABOVE FINISHED GRADE.
12. THE CONTRACTOR SHALL CONTACT THE PROPER UTILITY REPRESENTATIVE AS FOLLOWS FOR QUESTIONS OR COORDINATION OF CONSTRUCTION RELATED TO EXISTING UTILITIES.
SEE SCHEDULE ON SHEET 00G03
13. CONTRACTOR SHALL VERIFY THAT PIPING SHOWN TO BE ABANDONED OR AS ABANDONED PREVIOUSLY IS NO LONGER IN SERVICE. LINES IN SERVICE SHALL BE MAINTAINED UNTIL NO LONGER REQUIRED BY THE PLANT.
14. ALL EXISTING PIPES THAT ARE TO BE ABANDONED IN PLACE OR REMOVED MAY NOT BE SHOWN.
WHERE PIPING IS TO BE ABANDONED AND MUST REMAIN IN SERVICE UNTIL COMPLETION OF OTHER
PHASES OF WORK, AND IT CONFLICTS WITH NEW PIPING, TEMPORARILY RELOCATE PIPING AS REQUIRED TO MAINTAIN SERVICE BY THE PLANT.
15. CONTRACTOR SHALL REROUTE THE EXISTING PIPING IF REQUIRED TO MISS THE PROPOSED STRUCTURES. THE EXISTING PIPE SHALL REMAIN IN SERVICE UNTIL NEW PIPING IS READY TO BE PLACED INTO SERVICE. DOWNTIME SHALL BE A MAXIMUM OF 2 HOURS, UNLESS SPECIFIED OR SHOWN OTHERWISE.
16. ALL SIDEWALKS TO BE 3'-0" WIDE UNLESS SHOWN OTHERWISE.
17. THE CONTRACTOR SHALL TAKE SPECIAL PRECAUTIONS IN THE VICINITY OF ANY OVERHEAD ELECTRIC LINES. CONTRACTOR SHALL ABIDE BY THE NATIONAL ELECTRIC CODE AND ANY REQUIREMENT BY THE OWNER OF THE ELECTRIC LINES.
18. PROVIDE ALL SHEETING/SHORING REQUIRED TO PROTECT EXISTING STRUCTURES, PIPES AND FACILITIES.
19. CONTRACTOR SHALL VERIFY LOCATION OF ALL ARCHITECTURAL, MECHANICAL, AND ELECTRICAL ITEMS BEFORE PLACING ANY STRUCTURAL STEEL OR CONCRETE. ALSO, STRUCTURAL DIMENSIONS
AND OPENINGS CONTROLLED BY ARCHITECTURAL, MECHANICAL, OR ELECTRICAL EQUIPMENT SHALL BE VERIFIED BY THE CONTRACTOR PRIOR TO CONSTRUCTION.
20. MECHANICAL AND ELECTRICAL EQUIPMENT SUPPORTS, ANCHORAGES, OPENINGS, RECESSES, AND
REVEALS NOT SHOWN ON THE STRUCTURAL DRAWINGS, THAT ARE REQUIRED BY OTHER CONTRACT DRAWINGS, SHALL BE PROVIDED PRIOR TO CASTING CONCRETE.
PROJECT NO.
LAST SAVED BY:
FILE NAME:
Plot Date:
CDA
JDM
BWA
00C02
21 CIVIL
GENERAL CIVIL NOTES AND SCHEDULES
8660F1000C02.dwg
JDiDonato
8660F10
10/5/2022 11:07:47 AM
Digitally signed by Brian W. Avon
Contact Info: Carollo Engineers, Inc.
Date: 2023.04.10 09:13:40-07'00'
EC
EC
EC
EC
EC
EC
EC
EC
EC
Plot Date: 4/7/2023 9:49:49 AM
REV DATE BY DESCRIPTION
DATE
CHECKED
DRAWN
DESIGNED
8660F.10
JOB NO.
DRAWING NO.
SHEET NO.
SCALES ACCORDINGLY
VERIFY SCALES
THIS SHEET, ADJUST
IF NOT ONE INCH ON
BAR IS ONE INCH ON
ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200
CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 76832
PROJECT NO. LAST SAVED BY: FILE NAME:
CDA
JRD
JM
00C03
22 CIVIL
WWTP SITE PLAN
8660F1000C03.dwg JDiDonato 8660F10
FILE:
PLAN
8660F10C04
DIGESTER
NO. 1
DIGESTER
NO. 2
SLUDGE
DE-WATERING
FACILITY
NORTH POND MIDDLE POND
BACKWASH
PUMP STATION
TRUCK FILL HYDRANT
(PHASE 3) TO BE REMOVED
AND REPLACED DURING
POND CONSTRUCTION
SOUTH POND
EX 12" SL
EXISTING
DREDGE LINE
2 1
EX 6" SL
6" SL
KEY NOTES:
1. PRIOR TO INSTALLING THE NEW 6" SLUDGE PIPE,
CONTRACTOR SHALL FIELD VERIFY THE
LOCATION, CONDITION, MATERIAL, OUTSIDE
DIAMETER OF THE EXISTING 6" SLUDGE LINE
(APPROXIMATELY 4 FEET BELOW GRADE), AND
NOTIFY THE ENGINEER. USE
FITTINGS/COUPLINGS AS REQUIRED.
2. PRIOR TO INSTALLING THE NEW 6" SLUDGE PIPE,
CONTRACTOR SHALL FIELD VERIFY THE
LOCATION, CONDITION, MATERIAL, OUTSIDE
DIAMETER OF THE EXISTING 12" SLUDGE LINE
(APPROXIMATELY 4 FEET BELOW GRADE), AND
NOTIFY THE ENGINEER. USE
FITTINGS/COUPLINGS AS REQUIRED.
GENERAL NOTES:
1. THE LOCATIONS OF UTILITIES SHOWN ARE
APPROXIMATE. CONTRACTOR IS RESPONSIBLE
FOR FIELD VERIFICATION OF ALL RELEVANT
EXISTING UTILITIES.
X
SCALE
0 20' 40' 80'
SCALE: 1" = 40'
Know what's below.
Callbefore you dig.
Digitally signed by Brian W. Avon
Contact Info: Carollo Engineers, Inc.
Date: 2023.04.10 09:13:56-07'00'
EC
G G G G G G G G G G G G G G G G G G G G G G
G G G G G G G G
G G G G G G
570
570
580
580
BP STA 10+00.00
N=2169003.65
E=6223990.95
PC STA 10+09.50
N=2169013.10
E=6223989.90
PC STA 14+96.39
N=2168995.80
E=6223521.77
PC STA 17+98.87
N=2168731.45
E=6223546.43
PC STA 22+34.39
N=2168726.04
E=6223965.35
PT STA 10+63.71
N=2169043.59
E=6223951.80
PT STA 15+95.02
N=2168922.96
E=6223476.59
PT STA 18+69.94
N=2168695.81
E=6223602.15
PT STA 23+21.48
N=2168786.35
E=6224014.99
10+00
11+00
11+00
12+00
13+00
14+00
15+00
16+00
17+00
18+00
19+00
20+00
21+00
22+00
23+00
24+00
25+00
STA 24+97.86
OFFSET=12.26' L
NORTHING=2168960.31
EASTING=6223983.41
581.00 FG GB
STA 23+92.53
OFFSET=42.83' L
NORTHING=2168852.26
EASTING=6223964.60
570.95 FG GB
3:1
3:1
3:1
3:1
3:1
3:1
3:1
9.3%
3:1
3:1
3:1
3:1
3:1
3:1
575
580
572 573 574
576 577 578 579
581
575
580
573
574
576
577
578
579
581
575
580
580
572
573
574
576
576
577
577
578
578
579
579
581
581
580
576
577
578
579
581
570
575
571
571
571
572
572
572
573
574
576
577
580
577
578
579
581
575 576 577 578
571
Plot Date: 4/7/2023 9:32:31 AM
SCALE
REV DATE BY DESCRIPTION
DATE
CHECKED
DRAWN
DESIGNED
8660F.10
JOB NO.
DRAWING NO.
SHEET NO.
SCALES ACCORDINGLY
VERIFY SCALES
THIS SHEET, ADJUST
IF NOT ONE INCH ON
BAR IS ONE INCH ON
ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200
CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 76832
PROJECT NO. LAST SAVED BY: FILE NAME:
CDA
OV
BWA
91C01
23 CIVIL
PAU GRADING PLAN
8660F1091C01.dwg atucker 8660F10
FILE:
PLAN
8660F10C04
0 15' 30' 60'
SCALE: 1" = 30'
Know what's below.
Callbefore you dig.
KEY NOTES:
1. FINISHED GRADE OF THE BOTTOM OF THE PAU
SHALL BE SLOPED FROM THE TOE OF THE SLOPE
TO THE PUMP STATION INLET.
2. RECYCLED WATER INFRASTRUCTURE SHALL
REMAIN IN SERVICE DURING CONSTRUCTION.
PROTECT IN PLACE.
3. REFER TO SHEET 91C07 FOR PAU INLET PIPING
ALIGNMENT AND PROFILE.
4. REFER TO SHEET 91C08 FOR PAU OUTLET PIPING
ALIGNMENT AND PROFILE.
5. REFER TO SHEET 91S04 FOR PAU INLET
STRUCTURE.
6. ACCESS ROAD ON TOP OF BERM SHALL CONSIST
OF 6-INCHES AB OVER GEOTEXTILE FABRIC WITH
1-FOOT SUBGRADE AT 95% RC UNLESS
OTHERWISE NOTED. ACCESS ROAD TO BE SEALED
IN ACCORDANCE WITH SPECIFICATION SECTION
02747.
7. THE CONTRACTOR SHALL DECOMMISSION THE
EXISTING BURIED ELECTRIC UTILITY BEFORE PAU
CONSTRUCTION. REFER TO SPECIFICATION
SECTION 01140 FOR WORK RESTRICTIONS. THE
CONTRACTOR SHALL REESTABLISH THE BURIED
ELECTRIC UTILITY AS SHOWN ON THE ELECTRIC
SITE PLAN. REFER TO DWG 01E02.
8. 8" THICK SLAB ON GRADE WITH #5@12" O.C. EACH
WAY. REFER TO DETAIL 5/91C04.
9. 8" THICK SLOPED SLAB ON GRADE (WALL) WITH
#5@12" O.C. EACH WAY. REFER TO DETAIL 5/91C04
AND DETAIL 7/91C04.
10. CONSTRUCTION JOINTS IN SLAB ON GRADE
SPACED AT MAXIMUM 20'-0" O.C. IN EACH
DIRECTION. THE JOINTS SHALL AS PER TYPICAL
DETAIL S110 WITH WATER STOP AND EXTEND
THROUGH THE SLOPED SLAB ON GRADE (WALL).
11. EXPANSION JOINT PER DETAIL 6 /91C04 TYPICAL
ALL AROUND THE BASIN.
12. TOP OF THE BERM CONCRETE LINER DETAIL PER
DETAIL 7/91C04 TYPICAL ALL AROUND THE BASIN.
13. ADJUST CONSTRUCTION JOINT LOCATION TO
ACCOMMODATE INLET STRUCTURES.
GENERAL NOTES:
1. CONTRACTOR TO VERIFY THE HORIZONTAL AND
VERTICAL LOCATIONS OF ALL EXISTING UTILITIES
PRIOR TO THE START OF CONSTRUCTION AND
NOTIFY THE ENGINEER OF ANY DISCREPANCIES
OR CONFLICTS.
2. CLEAR, GRUB, AND STRIP CONSTRUCTION AREAS
PRIOR TO EARTHWORK ACTIVITIES PER
SPECIFICATION SECTION 02200.
3. REFER TO SPECIFICATION SECTION 02300 AND
02301 FOR EARTHWORK AND BACKFILL
REQUIREMENTS.
4. THE CONTRACTOR SHALL REMOVE ALL EXISTING
SLUDGE MATERIAL. THE SLUDGE MATERIALS
SHALL BE REMOVED TO AN APPROXIMATE
ELEVATION OF 567 FEET.
X
16" RW 30" RW
16" SE
PRODUCTION
AUGMENTATION UNIT
RW METER
VAULT
(PHASE 3)
TO PHASE 3
DISTRIBUTION SYSTEM
TOP OF BERM
PAU PUMP STATION
INLET INVERT
ELEVATION = 570.0
12" SE
1 TOE OF
SLOPE
CAUTION HIGH
PRESSURE GAS PIPELINE
TOE OF SLOPE
2 2
TOE OF SLOPE
3 4
1 91C03
D
91C02
E
91C02
A
91C02
13'
13'
13'
C
91C02
B
91C02
13'
TOE OF SLOPE
CUT: 31974 CUBIC YARDS
FILL: 2747 CUBIC YARDS
91C06
A
EX SLUDGE
DEWATERING
FACILITY
EX CHLORINE
CONTACT BASINS
LEGEND:
CONCRETE BASIN DESIGN PER 91C03
EX
OPERATIONS
BUILDING
PAU INLET PIPING
INVERT ELEVATION =
570.78
TOE OF SLOPE
ELEVATION = 571.28
TOE OF SLOPE
ELEVATION = 571.40
TOE OF SLOPE
TOE OF SLOPE ELEVATION = 571.24
ELEVATION = 571.37
TOE OF SLOPE
ELEVATION = 571.63
TOE OF SLOPE
ELEVATION = 571.47
TOE OF SLOPE
ELEVATION = 571.47
TOE OF SLOPE
ELEVATION = 571.12
FUTURE CHLORINE CONTACT BASIN
EX CAROUSEL
PUMP STATION
EX BACKWASH
PUMP STATION
6 7
8 9
10 11
12 13
13 TYP
CF161
Digitally signed by Brian W. Avon
Contact Info: Carollo Engineers, Inc.
Date: 2023.04.10 09:14:11-07'00'
560
565
570
575
580
585
590
560
565
570
575
580
585
590
9+60 10+00 11+00 12+00
0.0%
0.0%
STA 10+00.00
BEGIN ACCESS RAMP
FG 581.00
STA 10+43.99OFFSET =12.26' LFG 581.00
STA 11+51.73
OFFSET 34.43' LFG 570.95
FG @
CENTERLINE
APPROX EXIST
GROUND @
CENTERLINE
-9.3%
565
GROUND WATER ELEV
13'
FG ELEV
571.37
TOP OF BERM
FG ELEV 581.00
3:1
579
FG @ CENTERLINE
APPROX EXIST
GROUND @ CENTERLINE
565
GROUND WATER ELEV
3:1
APPROX EXIST
GROUND @ CENTERLINE
13'
APPROX EXIST
GROUND @ CENTERLINE
FG @ CENTERLINE
FG ELEV
571.12
TOP OF BERM
FG ELEV 581.00
579
3:1
PREVENT RUNOFF FROM
COLLECTING AT THE TOE
OF THE SLOPE (TYP)
OUTER SLOPE OF BERM
TO BE MINIMUM 3H:1V.
REGRADE AS REQUIRED
565
GROUND WATER ELEV
-120-100
13'
FG ELEV
571.47
TOP OF BERM
FG ELEV 581.00
579
565
GROUND WATER ELEV
FG @ CENTERLINE
3:1
3:1
APPROX EXIST
GROUND @ CENTERLINE
13'
FG ELEV
571.28
TOP OF BERM
FG ELEV 581.00
-120-100
579
565
GROUND WATER ELEV
3:1
3:1
FG @ CENTERLINE
APPROX EXIST
GROUND @ CENTERLINE
Plot Date: 4/7/2023 9:50:32 AM
SCALE
REV DATE BY DESCRIPTION
DATE
CHECKED
DRAWN
DESIGNED
8660F.10
JOB NO.
DRAWING NO.
SHEET NO.
SCALES ACCORDINGLY
VERIFY SCALES
THIS SHEET, ADJUST
IF NOT ONE INCH ON
BAR IS ONE INCH ON
ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200
CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 76832
PROJECT NO. LAST SAVED BY: FILE NAME:
CDA
JRD
JM
91C02
24 CIVIL
PAU
PROFILE AND SECTIONS
8660F1091C02.dwg JDiDonato 8660F10
Know what's below.
Callbefore you dig.
FILE:
A PROFILE
91C01
POND ACESS RAMP
POND AWT STORAGE.dwg
SCALE:
FILE:
B SECTION
91C01 AS NOTED
POND AWT STORAGE.dwg
BERM SECTION STA 14+25
(HORIZ)
0 5' 10' 20'
SCALE: 1" = 10'
0 25' 50' 100'
SCALE: 1" = 50'
(VERT)
SCALE:
FILE:
C SECTION
91C01 AS NOTED
POND AWT STORAGE.dwg
BERM SECTION STA 16+50
SCALE:
FILE:
D SECTION
91C01 AS NOTED
POND AWT STORAGE.dwg
BERM SECTION STA 19+50
SCALE:
FILE:
E SECTION
91C01 AS NOTED
POND AWT STORAGE.dwg
BERM SECTION ST 23+60
GENERAL NOTES:
1. CONTRACTOR TO VERIFY THE HORIZONTAL AND
VERTICAL LOCATIONS OF ALL EXISTING UTILITIES
PRIOR TO THE START OF CONSTRUCTION AND
NOTIFY THE ENGINEER OF ANY DISCREPANCIES
OR CONFLICTS.
2. PAU TO BE CONSTRUCTED PER SPECIFICATION
SECTIONS 02300 AND 02301.
3. CLEAR, GRUB, AND STRIP CONSTRUCTION AREAS
PRIOR TO EARTHWORK ACTIVITIES PER
SPECIFICATION SECTION 02200.
4. ACCESS ROAD ON TOP OF BERM SHALL CONSIST
OF 6-INCH AB OVER GEOTEXTILE FABRIC WITH
1-FOOT SUBGRADE AT 95% RC UNLESS
OTHERWISE NOTED. ACCESS ROAD TO BE
SEALED IN ACCORDANCE WITH SPECIFICATION
SECTION 02747.
5. UNPAVED AREAS OUTSIDE OF CONCRETE BASIN
OR ACCESS ROAD SHALL BE GRADED TO MEET
EXISTING GRADE, COMPACTED, AND RESEEDED
PER SPECIFICATION SECTION 02939.
6. THE CROSS-SECTIONS ON THIS SHEET ONLY
DEPICT EXISTING AND FINAL ELEVATIONS. REFER
TO DRAWING 91C03 FOR CONCRETE BASIN
DETAILS AND SUB-GRADE PREPARATION
REQUIREMENTS.
Digitally signed by Brian W. Avon
Contact Info: Carollo Engineers, Inc.
Date: 2023.04.10 09:14:26-07'00'
KEY NOTES:
1. EXTEND OVER EXCAVATION 5 FT LATERALLLY
BEYOND THE EDGE OF THE BASIN BOTTOM.
2. SLOPE OUTSIDE OF BERM TO MEET EXISTING
GRADE.
3. NATIVE MATERIAL, MINUS ORGANICS, DEBRIS,
AND OTHER DELETERIOUS MATERIALS ARE
SUITABLE FOR ENGINEERED FILL IF NOT
EXCEEDING A MAXIMUM PARTICLE SIZE OF 4
INCHES. EXCAVATED MATERIALS UNSUITABLE
FOR USE AS STRUCTURAL FILL CAN BE PLACED
OUTSIDE OF THE STRUCTURE LIMITS, OR
DISPOSED OFF-SITE.
4. BENCH FILL INTO THE EXISTING EMBANKMENT AT
A MINIMUM OF 1'H:1'V OF FILL PLACED, OR AS
NECESSARY TO REMOVE LOOSE MATERIAL AND
PROVIDE PROPER COMPACTION ALONG THE
ZONE OF TRANSITION.
5. IF IMPORTED SOIL IS REQUIRED FOR
CONSTRUCTION DUE TO EXISTING BACKFILL
MATERIAL BEING UNSUITABLE, THE
GEOTECHNICAL ENGINEER MUST REVIEW AND
APPROVE SOILS FOR USE PRIOR TO TRANSPORT
TO THE SITE.
6. BERM TO BE CONSTRUCTED IN ACCORDANCE
WITH SPECIFICATION SECTIONS 02300 AND 02301.
GENERAL NOTES:
1. ACCESS ROAD ON TOP OF BERM SHALL CONSIST
OF 6 INCH AB OVER GEOTEXTILE FABRIC WITH 1 FT
SUBGRADE AT 95% RC UNLESS OTHERWISE
NOTED. ACCESS ROAD TO BE SEALED IN
ACCORDANCE WITH SPECIFICATION SECTION
02747. ALL UNPAVED AREAS WITHIN THE PROJECT
SITE SHALL BE COMPACTED AND RESEEDED PER
SPECIFICATIONS UNLESS OTHERWISE NOTED.
2. UNPAVED AREAS OUTSIDE OF CONCRETE BASIN
OR ACCESS ROAD SHALL BE GRADED TO MEET
EXISTING GRADE, COMPACTED, AND RESEEDED
PER SPECIFICATION SECTION 02939.
3. CLEAR, GRUB, AND STRIP CONSTRUCTION AREAS
PRIOR TO EARTHWORK ACTIVITIES PER
SPECIFICATION SECTION 02200.
X
PROJECT NO.
LAST SAVED BY:
FILE NAME:
Plot Date:
CDA
JRD
BWA
91C03
25 CIVIL
PAU DETAILS 1
8660F1091C03.dwg
JDiDonato
8660F10
9/12/2022 7:29:07 AM
REV DATE BY DESCRIPTION
DATE
CHECKED
DRAWN
DESIGNED
8660F.10
JOB NO.
DRAWING NO.
SHEET NO.
SCALES ACCORDINGLY
VERIFY SCALES
THIS SHEET, ADJUST
IF NOT ONE INCH ON
BAR IS ONE INCH ON
ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200
CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 76832
Know what's below.
Callbefore you dig.
SCALE:
FILE:
1 DETAIL
- 3/4"=1'-0"
8660F1091C03
TOP OF BERM
SCALE:
FILE:
2 DETAIL
- 3/4"=1'-0"
8660F1091C03
VEHICULAR ACCESS RAMP
SCALE:
FILE:
3 DETAIL
- 3/4"=1'-0"
8660F1091C03
EXCAVATION SECTION
SCALE:
FILE:
4 DETAIL
- 3/4"=1'-0"
8660F1091C03
CONCRETE BASIN SECTION
2% SLOPE
2'-0"
13'-0"
10'-6" 6"
VARIES
SEE SHEET 91C01
SLOPE VARIES
SEE SHEET 91C01
(3:1 MAX)
TOP OF BERM
6" MIN 100% CRUSHED CLASS 2 AGGREGATE
BASE (1 1/2") COMPLACT WITH VIBRATORY
DRUM TO 95% R.C., ACCESS ROAD TO BE
SEALED IN ACCORDANCE WITH SECTION 02747
CONCRETE LINER INSTALLED
PER DETAIL 5/91C04
BACKFILL STABILIZED AND
COMPACTED IN 8 INCH LIFTS
PER SECTION 02300 3:1
3:1
CONCRETE LINER INSTALLED
PER DETAIL 5/91C04
CONCRETE RAMP
6 91C04
8 91C04
3:1
#5@12" O.C. BOTH WAYS
@ MIDDLE SLAB (TYP)
5 91C04
(TYP)
EX TOP OF BERM
(EL 581)
NATIVE MATERIAL BERM
PROPOSED BASIN AREA
LIMIT OF OVER EXCAVATION
(EL 566)
FG EL 570
5'-0" 5'-0"
1 1
OVER EXCAVATE TO REMOVE
ALL SLUDGE SEDIMENTS FROM
EXISTING BASIN
NATIVE MATERIAL BERM
EX TOP OF BERM
(EL 581)
TOP OF BERM
(FG EL 581)
3:1
3:1
6 91C04
10'-6"
OVERBUILD BERM AND
CUT BACK TO NEAT LINES
4 CONCRETE LINER INSTALLED
PER DETAIL 5/91C04
FINISHED GRADE
PER SHEET 91C01
TOP OF BERM
(FG EL 581)
6 NATIVE MATERIAL BERM. CONSTRUCT BERM IN
8" LOOSE LIFTS COMPACTED TO 90% RC
3 2
ACCESS ROAD FILL
AGGREGATE BASE
LEGEND:
CONCRETE
EXISTING BACKFILL
12'-0"
Digitally signed by Brian W. Avon
Contact Info: Carollo Engineers, Inc.
Date: 2023.04.10 09:14:41-07'00'
GENERAL NOTES:
1. ACCESS ROAD ON TOP OF BERM SHALL CONSIST
OF 6 INCH AB OVER GEOTEXTILE FABRIC WITH 1 FT
SUBGRADE AT 95% RC UNLESS OTHERWISE
NOTED. ACCESS ROAD TO BE SEALED IN
ACCORDANCE WITH SPECIFICATION SECTION
02747. ALL UNPAVED AREAS WITHIN THE PROJECT
SITE SHALL BE COMPACTED AND RESEEDED PER
SPECIFICATIONS UNLESS OTHERWISE NOTED.
2. UNPAVED AREAS OUTSIDE OF CONCRETE BASIN
OR ACCESS ROAD SHALL BE GRADED TO MEET
EXISTING GRADE, COMPACTED, AND RESEEDED
PER SPECIFICATION SECTION 02939.
3. CLEAR, GRUB, AND STRIP CONSTRUCTION AREAS
PRIOR TO EARTHWORK ACTIVITIES PER
SPECIFICATION SECTION 02200.
PROJECT NO.
LAST SAVED BY:
FILE NAME:
Plot Date:
CDA
JRD
JM
91C04
26 CIVIL
PAU DETAILS 2
8660F1091C04.dwg
atucker
8660F10
9/12/2022 7:29:07 AM
REV DATE BY DESCRIPTION
DATE
CHECKED
DRAWN
DESIGNED
8660F.10
JOB NO.
DRAWING NO.
SHEET NO.
SCALES ACCORDINGLY
VERIFY SCALES
THIS SHEET, ADJUST
IF NOT ONE INCH ON
BAR IS ONE INCH ON
ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200
CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 76832
COMPACT AGGREGATE
BASE COURSE
COMPACTED TO 95%
SCALE:
FILE:
5 DETAIL
91C03 1 1/2"=1'-0"
8660F1091C04
CONCRETE PAVEMENT
OVER EXCAVATION AND
COMPACT AS PER
GEOTECHNICAL REPORT
#5@12" EW
5000 PSI CONCRETE
BROOMED FINISH
5 -
8" 6"
5"
(CLR)
(MIN)
1'-0" 8"
8"
#5@12"
(4) #5 CONT (TYP)
5 -
(TYP)
5 -
(TYP)
(TYP)
#5@12" O.C. EA. WAY
2'-0"
10"
8"
1/2" EXPANSION JOINT
PER DETAIL S130/TYP
1/2" EXPANSION JOINT
PER DETAIL S130/TYP
12" LAP
BOTH SIDES
12" LAP
BOTH SIDES
8"
1'-0" 8"
1'-0" 8"
1 1.5
1 1.5
Know what's below.
Callbefore you dig.
10" 10" 10" 10"
1'-0" 8"
(4) #5 CONT (TYP)
#5@12"
SCALE:
FILE:
6 DETAIL
91C03 1 1/2"=1'-0"
8660F1091C04
SCALE:
FILE:
7 DETAIL
91C03 1 1/2"=1'-0"
8660F1091C04
SCALE:
FILE:
8 DETAIL
91C03 1 1/2"=1'-0"
8660F1091C04
AGGREGATE BASE
LEGEND:
CONCRETE
EXISTING BACKFILL
1'-8"
1'-8"
Digitally signed by Brian W. Avon
Contact Info: Carollo Engineers, Inc.
Date: 2023.04.10 09:15:08-07'00'
BP STA 10+00.00
N=2169003.65
E=6223990.95
PC STA 10+09.50
N=2169013.10
E=6223989.90
PC STA 14+96.39
N=2168995.80
E=6223521.77
PC STA 17+98.87
N=2168731.45
E=6223546.43
PC STA 22+34.39
N=2168726.04
E=6223965.35
PT STA 10+63.71
N=2169043.59
E=6223951.80
PT STA 15+95.02
N=2168922.96
E=6223476.59
PT STA 18+69.94
N=2168695.81
E=6223602.15
PT STA 23+21.48
N=2168786.35
E=6224014.99
10+00
11+00
11+00
12+00
13+00
14+00
15+00
16+00
17+00
18+00
19+00
20+00
21+00
22+00
23+00
24+00
25+00
L1
L2
L3
L4
L5
L6
L8
L7
L9
L10
L11
L12
L13
L14
L15
L17 L18
C1
C3
C5
C7
STA 24+97.86
OFFSET=12.26' L
NORTHING=2168960.31
EASTING=6223983.41
581.00 FG GB
STA 23+92.53
OFFSET=42.83' L
NORTHING=2168852.26
EASTING=6223964.60
570.95 FG GB
Curve Table
Curve #
C1
C3
C5
C7
Length
97.48 79.55
40.20 64.42
Radius
61.00 61.00
61.00 41.00
Delta
91.56 74.72
37.76 90.03
Line Table
Line #
L1
L2
L3
L4
L5
L6
L7
L8
L9
L10
L11
L12
L13
L14
L15
L17
L18
Length
210.34
37.34 364.45
43.05 203.84
41.97 134.27
31.23 96.77
39.31 96.77
25.16 5.85
3.52 16.59
14.93 87.28
Direction
N6° 18' 52.04"W
S16° 34' 28.96"W
N85° 14' 31.97"E
S6° 18' 52.04"E
S20° 02' 13.69"E
N5° 53' 12.34"E
S83° 39' 30.43"W
N38° 25' 10.85"W
S9° 52' 16.31"W
N85° 14' 31.97"E
N9° 52' 16.31"E
N6° 17' 51.03"W
N6° 18' 52.04"W
S78° 13' 05.23"W
S57° 44' 59.02"W
N85° 14' 31.97"E
N85° 14' 31.97"E
Plot Date: 4/6/2023 1:19:07 PM
SCALE
REV DATE BY DESCRIPTION
DATE
CHECKED
DRAWN
DESIGNED
8660F.10
JOB NO.
DRAWING NO.
SHEET NO.
SCALES ACCORDINGLY
VERIFY SCALES
THIS SHEET, ADJUST
IF NOT ONE INCH ON
BAR IS ONE INCH ON
ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200
CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 76832
PROJECT NO. LAST SAVED BY: FILE NAME:
CDA
JRD
JM
91C05
27 CIVIL
PAU SURVEY CONTROL PLAN
8660F1091C05.dwg atucker 8660F10
FILE:
PLAN
8660F10C04
0 15' 30' 60'
SCALE: 1" = 30'
Know what's below.
Callbefore you dig.
KEY NOTES:
1. LIMIT OF GRADING SHOWN. THE BERM OUTSIDE
OF THE ACCESS ROAD SHOULD BE SLOPED AT
1V:3H TO MEET THE EXISTING GRADE. REFER
TO DRAWING 91C04 FOR TYPICAL BERM
DETAILS.
2. REFER TO DRAWING 91C06 FOR PUMP STATION
AND INLET LOCATIONS.
3. REFER TO DRAWING 91C07 FOR PUMP STATION
AND INLET LOCATIONS.
GENERAL NOTES:
1. REFER TO 91C01 FOR PAU GRADING PLAN.
2. THE PLAN DEPICTS FINISHED GRADE AND
DIMENSIONS. REFER TO 91C04 FOR CONCRETE
BASIN AND SUBGRADE DESIGN DETAILS.
X
TOE OF
SLOPE
TOE OF SLOPE
TOE OF SLOPE
2 3
1 1
1 Digitally signed by Brian W. Avon
Contact Info: Carollo Engineers, Inc.
Date: 2023.04.10 09:15:23-07'00'
L14
N=2168986.26
E=6223803.26
N=2168993.39
E=6223794.92
N=2169020.80
E=6223799.44
N=2169035.82
E=6223789.73
575
580
571
572
573
574
576
577
578
579
Plot Date: 4/6/2023 9:47:21 AM
SCALE
REV DATE BY DESCRIPTION
DATE
CHECKED
DRAWN
DESIGNED
8660F.10
JOB NO.
DRAWING NO.
SHEET NO.
SCALES ACCORDINGLY
VERIFY SCALES
THIS SHEET, ADJUST
IF NOT ONE INCH ON
BAR IS ONE INCH ON
ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200
CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 76832
PROJECT NO. LAST SAVED BY: FILE NAME:
CDA
JRD
BWA
91C06
28 CIVIL
PAU PUMP STATION PLAN
8660F1091C06.dwg atucker 8660F10
0 2.5' 5' 10'
SCALE: 1" = 5'
Know what's below.
Callbefore you dig.
GENERAL NOTES:
1. REFER TO DRAWING 91S01 FOR PUMP STATION
DIMENSIONS.
SCALE:
FILE:
PLAN
SITE
8660F1073C0801
A 1" = 5'
1 91S03
16" INLET FROM PAU
TO CHLORINATION
STRUCTURE, SEE
DWG 91C08 FOR
CONTINUATION
PRODUCTION
AUGMENTATION UNIT
PAU PUMP
STATION
PAU PUMP STATION
INLET STRUCTURE
LEGEND:
CONCRETE BASIN DESIGN PER 91C03
A
91M01
A/B
91S01
Digitally signed by Brian W. Avon
Contact Info: Carollo Engineers, Inc.
Date: 2023.04.10 09:15:48-07'00'
570
580
580
11+75.22
10+00
11+00
STA. 10+22.82
N=2169077.31
E=6224077.77
Δ=90°00'00" LT
EC
11+75.22
10+00
11+00
571.0
STA. 10+93.06
N=2169071.28
E=6224007.79
Δ=45°00'00" RT
STA. 10+04.73
N=2169095.34
E=6224076.24
STA. 11+75.22
N=2169008.41
E=6223954.90
16" PAU INLET
556
560
564
568
572
576
580
584
588
556
560
564
568
572
576
580
584
588
9+50 10+00 11+00 12+00 13+00 STA=10+12 16" 90° BEND INV = 575.95
PROPOSED
PAU BERM
STA=10+12
16" 90° BEND
INV=581.66
DIP
PVC
TYP
CY111
30" RW
TOP=568.78
16" RW
TOP=569.48
36" x 30" CULVERT
TOP=572.06
36" x 30" CULVERT
TOP=571.95
STA:11+75.22
PAU INLET
INV=570.78
165 LF OF 16' PVC DR 18
RESTRAINED JOINTS REQ'D
STA:10+04.73
INV=581.83
STA=10+07.20
16" BFV
INV=581.83
EXISTING GRADE
PAU INLET
STA=10+22.82
16" 90° BEND
INV = 575.95
STA=10+93.06
STA=11+32.56
16" 45° BEND
INV = 575.95
STA=11+40.53
16" 45° BEND
INV = 568.45
16" 45° BEND
INV = 575.95
Plot Date: 4/6/2023 11:14:18 AM
SCALE
REV DATE BY DESCRIPTION
DATE
CHECKED
DRAWN
DESIGNED
8660F.10
JOB NO.
DRAWING NO.
SHEET NO.
SCALES ACCORDINGLY
VERIFY SCALES
THIS SHEET, ADJUST
IF NOT ONE INCH ON
BAR IS ONE INCH ON
ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200
CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 76832
PROJECT NO. LAST SAVED BY: FILE NAME:
CDA
JRD
JM
91C07
29 CIVIL
PLAN AND PROFILE
PAU INLET YARD PIPING
8660F1091C07.dwg JDiDonato 8660F10
Know what's below.
Callbefore you dig.
KEY NOTES:
1. CROSSING DEPTH UNKNOWN. CONTRACTOR TO
VERIFY PRIOR TO EXCAVATION.
2. REFER TO DRAWING 89M01 FOR CONTINUATION
AND CONNECTION TO PUMP STATION.
GENERAL NOTES:
1. CONTRACTOR TO VERIFY ALL CROSSINGS PRIOR
TO CONSTRUCTION.
X
(HORIZ)
0 5' 10' 20'
SCALE: 1" = 10'
0 10' 20' 40'
SCALE: 1" = 20'
(VERT)
1 2
16" RW
30" RW
42" FE
36" FE
EX CULVERT
FILE:
PLAN
8660F1073C0801
FILE:
PROFILE
8660F1073C0801
EX DECHLORINATION
STRUCTURE
EX CAROUSEL
PUMP STATION
1 1 1
EX CHLORINE
CONTACT BASINS
FUTURE
CHLORINE
CONTACT BASIN
95S01
H
2 Digitally signed by Brian W. Avon
Contact Info: Carollo Engineers, Inc.
Date: 2023.04.10 09:16:08-07'00'
L7
L14
580
EC
EC
EC
EC
EC
EC
EC
13+93.35
10+00
11+00
12+00
13+00
STA. 11+21.22
N=2169159.94
E=6223780.02
Δ=45°00'00" RT
STA. 13+78.35
N=2169405.53
E=6223769.41
Δ=90° LT
STA. 11+56.26
N=2169187.03
E=6223802.25
Δ=45°00'00" LT
STA. 13+33.12
N=2169360.93
E= 6223785.66
Δ=11.25° LT
9+74 10+00
11+00
12+00
13+00
13+93.35
STA. 10+02.00
N=2169041.44
E=6223793.13
556
560
564
568
572
576
580
584
588
592
556
560
564
568
572
576
580
584
588
592
9+50 10+00 11+00 12+00 13+00 14+00 14+50 STA=10+02 INV - 570.20 12" EX UTILITY TOP=575.50 6" DRAIN TOP=572.61 2" EX UTILITY TOP=575.50 2" EX UTILITY TOP=575.50 4" SW TOP=575.19 14" BW TOP=573.69 24" FE TOP=576.03 4" DR TOP=574.92
EXISTING GRADE
STA=11+06.79
10" 45° BEND
INV = 566.68
TYP
CY111
STA=13+93.69
CONNECTION TOCHLORINATION FAC
INV = 571.00
42" SE
TOP = 568.00
24" WWTOP = 571.00
42" SCE
TOP = 568.00
394 LF OF 10" PVC DR 18
RESTRAINED JOINTS REQ'D
EXISTING
CHLORINATION
FACILITY
STA=13+33.12
10" 11.25° BEND
INV = 573.50
STA=13+78.35
10" 90° BEND ROLLED 45°
INV = 573.50
PAU PUMP
STATION
EX 12" UNK
INV=573.5±
EX 12" UNK
INV=573.6±
EX 12" UNK
INV=573.5±
EX 12" UNK
INV=573.4±
EX 12" UNK
INV=573.6±
2'X1.5' DUCTBANK
INV=573.3±
DUCT BANK (ASSUMED)
TOP=574.56
12" EX UTILITY
TOP=574.21
STA:13+02.00
10" BFV
INV=571.42
STA:13+22.00
10" CHECK VALVE
INV=571.47
STA=11+03.06
10" 45° BEND
INV = 570.20
STA=11+06.79
10" 45° BEND
INV = 566.68
STA=11+21.22
10" 45° BEND
INV = 566.68
STA=11+56.26
10" 45° BEND
INV = 566.68
STA=12+01.46
10" 45° BEND
INV = 566.66
STA=12+06
10" 45° BEND
INV = 571.19
Plot Date: 4/7/2023 9:33:50 AM
SCALE
REV DATE BY DESCRIPTION
DATE
CHECKED
DRAWN
DESIGNED
8660F.10
JOB NO.
DRAWING NO.
SHEET NO.
SCALES ACCORDINGLY
VERIFY SCALES
THIS SHEET, ADJUST
IF NOT ONE INCH ON
BAR IS ONE INCH ON
ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200
CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 76832
PROJECT NO. LAST SAVED BY: FILE NAME:
CDA
JDM
JM
91C08
30 CIVIL
PLAN AND PROFILE
PAU OUTLET YARD PIPING
8660F1091C08.dwg atucker 8660F10
Know what's below.
Callbefore you dig.
KEY NOTES:
1. REFER TO DRAWING 91M01 FOR CONTINUATION
AND CONNECTION TO PUMP STATION.
2. SEE DETAIL P300/TYP FOR CONNECTION TO
EXISTING WET WELL. CONTRACTOR TO VERIFY
CONNECTION POINT AND SUPPORT ADJACENT
YARD PIPING WHILE EXCAVATING. CONNECTION
LOCATION SHOULD NOT INTERFERE WITH
EXISTING EFFLUENT FLOW TRANSMITTER.
3. CROSSING DEPTH UNKNOWN. CONTRACTOR TO
VERIFY PRIOR TO EXCAVATION.
GENERAL NOTES:
1. CONTRACTOR TO VERIFY ALL UTILITY OR PIPE
CROSSINGS PRIOR TO CONSTRUCTION.
X
(HORIZ)
0 2' 4' 8'
SCALE: 1" = 4'
0 10' 20' 40'
SCALE: 1" = 20'
(VERT)
1 2
STA. 13+93.65
N=2169400.29
E=6223755.35
CONNECTION TO
CHLORINATION FACILITY
EX STORM DRAIN PUMP
STATION (ABANDONED)
EX 4" RCW
EX 24" FE
EX 14" BW
(ABANDONED)
EX 4" FW
PAU PUMP
STATION INLET
EX BACKWASH
PUMP STATION
EX CHLORINE
CONTACT BASINS
EX 24" FE
EX DAFT BUILDING
EX CHEMICAL STORAGE
EX 42" SE
EX 24" WW
EX RECLAIMED
WATER FILTERS
EX AWT WET WELL
EX AWT FACILITY
PAU PUMP STATION
FILE:
PLAN
8660F1073C0801
FILE:
PROFILE
8660F1073C0801
EX CHLORINATION
FACILITY
TYP
MP532
(TYP)
3 3
3 3
91S03
E
1 2
Digitally signed by Brian W. Avon
Contact Info: Carollo Engineers, Inc.
Date: 2023.04.10 09:16:23-07'00'
580
584
588
592
596
600
604
608
612
580
584
588
592
596
600
604
608
612
A9+00 A10+00 A11+00 A12+00 A13+00 A14+00 A15+00 A16+00 A17+00 A18+00 A19+00
EXISTING GRADE
STA A10+18.60
INV=593.82
18" 22.5° BEND
STA A10+63.72
INV=590.91
18" 90° VERT BEND
STA A13+00.61
INV=596.62
18" 90° VERT BEND
STA A13+00.61
INV=590.91
18" 90° VERT BEND
EX 6" W
INV=599.3±
EX W
INV=600.6±
EX 6" SS
INV=593.8±
STA B10+62.22
CARV
STA A12+95.60
BLOW OFF
M-28
STA A10+05.00
METER TAP
STA A10+15.39
INV=593.90
18" X 16" RED
STA A17+76.16
INV=598.11
STA A10+63.72
INV=596.52
18" 90° VERT BEND
18" RW
STA A10+02.50
CARV
EX 16" RW
STA=A10+09.83
16" BFV
STA A10+14.54
METER TAP
STA=A13+10.84
18" BFV
S=-6.27%
S=-1.01%
S=-0.50%
S=-0.09%
STA A13+04.68CARV
STA A13+29.02
INV=596.61
18" 45° BEND
STA A13+72.15
INV=596.61
18" 45° BEND
EX 21" SS
INV=592.6±
STA A13+98.58
INV=596.60
18" 45° BEND
STA A15+28.29
INV=597.89
STATE (CALTRANS) ROW
227 LF OF 30" STEEL CASING
INSTALL 227 LF OF FPVC DR 18 INSTALL 318 LF OF FPVC DR 18 INSTALL 288 LF OF 18" PVC DR18 TYP
CY165
TYP
CY111
TYP
CY111
STA A10+00.00STA A16+12.00
EX 21" SS EX 15" SS
EX 18" W
EX T
EX E
EX OHW
EX 16" W
EX W
18" RW
STA A10+18.60
N=2186266.20
E=6222080.74
18" 22.5° BEND
STA A10+63.72
N=2186261.41
E=6222035.87
2-18" 90° VERT BEND
STA A13+00.61
N=2186263.25
E=6221798.99
2- 18" 90° VERT BEND
STA A13+29.02
N=2186283.34
E=6221778.91
18" 45° BEND
STA A13+72.15
N=2186283.34
E=6221735.78
18" 45° BEND
STA A13+98.58
N=2186302.04
E=6221717.09
18" 45° BEND
16" RW
STA A10+15.39
N=2186267.74
E=6222083.56
18" X 16" RED
EX OHW
A10+00
A11+00 A12+00
A13+00
A14+00
A15+00 A16+00 A17+00 A18+00 A19+00
STA A10+00
N=2186274.93
E=6222097.17
16" 90° BEND
LIVE OAK AVE
N BUSH ST
LOW GAP RD
LOW GAP RD
Plot Date: 4/7/2023 9:34:29 AM
SCALE
KEY MAP
PROJECT NO. LAST SAVED BY: FILE NAME:
CDA
BH
JM
99C01
31 CIVIL
PLAN AND PROFILE ALIGNMENT A
STA A09+40 TO A19+00
8660F1099C01.dwg JDiDonato 8660F10
4 REV DATE BY DESCRIPTION
DATE
CHECKED
DRAWN
DESIGNED
8660F.10
JOB NO.
DRAWING NO.
SHEET NO.
SCALES ACCORDINGLY
VERIFY SCALES
THIS SHEET, ADJUST
IF NOT ONE INCH ON
BAR IS ONE INCH ON
ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200
CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 76832
THIS SHEET
Know what's below.
Callbefore you dig.
BRU
BRUSH STREET
STATE HIGHWAY 101
REMOVE EX
16" RW LINE
RECEIVING PIT
JACKING PIT
TYP
CY745
3 5 1 1
2 PROPOSED METER
SERVICE LINE
REMOVE EX. CARV
3 WATER METER M-28
CARV
16" BFV
TYP
CY715
TYP
CARV CY745
TYP
CY745 CARV
BLOW OFF
TYP
CY733
TYP
18" BFV CY715
1 6
KEY NOTES:
1. VERTICAL BEND ACHIEVED BY PULLING JOINTS IN
PIPE. MAXIMUM ALLOWED DEFLECTION IS HALF
OF THE MANUFACTURER'S SPECIFIED
DEFLECTION CONTRACTOR MAY DEFLECT MORE
THAN ONE JOINT TO ACHIEVE TOTAL
DEFLECTION.
2. HORIZONTAL ALIGNMENT CHANGE ACHIEVED BY
ROTATING VERTICAL 90 DEGREE BEND 45
DEGREES
3. EXISTING WATER METER INSTALLED AS PART OF
PHASE 3 SCOPE, SHALL BE REUSED AND
REINSTALLED DURING PHASE 4 CONSTRUCTION.
4. MAINTAIN MINIMUM 12 FT CLEARANCE BETWEEN
GRADE AND TOP OF CASING.
5. VERTICAL BEND ACHIEVED BY ROLLING
HORIZONTAL BEND 8.7 DEGREES.
6. HORIZONTAL ALIGNMENT CHANGE ACHIEVED BY
ROTATING VERTICAL 90 DEGREE BEND 6.5
DEGREES.
GENERAL NOTES:
1. SEE RECYCLED WATER PROJECT PHASE 1 TO 3
PLANS FOR EXISTING RW PIPE ALIGNMENT.
2. CONTRACTOR TO DETERMINE FINAL LAUNCHING
AND RECEIVING PIT SIZE.
3. CONTRACTOR TO VERIFY ALL UTILITY CROSSINGS
PRIOR TO CONSTRUCTION.
4. CONTRACTOR TO ASSUME THAT ANY VERTICAL
BENDS SHOWN ON THE PLANS ARE ROTATED
FROM THE CORRESPONDING HORIZONTAL BENDS
UNLESS NOTED OTHERWISE.
INSTALL 16 LF OF 16"
FPVC DR 18
INSTALL 51 LF OF 18" FPVC DR 18
N ORCHARD AVE
MATCH LINE STA A19+00 SEE DWG 99C02
TYP
CY111
TYP
CY165
TYP
CY111
FILE:
PLAN
8660F1001C102
PROFILE
FILE: 8660F1001C102
(HORIZ)
0 2' 4' 8'
SCALE: 1" = 4'
0 20' 40' 80'
SCALE: 1" = 40'
(VERT)
KEY MAP
NORTH
#
Digitally signed by Brian W. Avon
Contact Info: Carollo Engineers, Inc.
Date: 2023.04.10 09:07:22-07'00'
EX 15" SS
A19+00 A20+00 A21+00 A22+00
A23+00
A24+00 A25+00 A26+00 A27+00
A28+00 A29+00
EX 15" SS
EX 12" W
EX W EX OHW
EX W
EX 6" SS
EX G
EX OHW
EX OHW
EX OHW
EX W
EX W
EX 15" SS EX OHW
EX 16" W
EX OHW
EX 6" SS
EX W
EX 16" W
STA A22+90.95
N=2186305.00
E=6220826.65
18" 45° BEND
STA A22+84.34
N=2186300.33
E=6220831.34
18" 45° BEND
STA A27+73.29
N=2186304.07
E=6220344.32
18" 22.5° BEND
STA A27+88.13
N=2186298.36
E=6220330.61
18" 22.5° BEND
18'' RW
TYP
CARV CY745
LIVE OAK AVE
N BUSH ST
LOW GAP RD
LOW GAP RD
588
592
596
600
604
608
612
616
588
592
596
600
604
608
612
616
A19+00 A20+00 A21+00 A22+00 A23+00 A24+00 A25+00 A26+00 A27+00 A28+00 A29+00
EXISTING GRADE
EX W
INV=603.4±
EX W LATERAL
INV=606.2±
EX W LATERAL
INV=606.3±
EX 6" SS
INV=597.6±
EX 15" SS
INV=597.4±
EX 6" SS
INV=598.8±
EX GAS
INV=607.1±
EX GAS
INV=607.1±
EX W
INV=607.2±
INSTALL 1000 LF OF 18" PVC DR 18
TYP
CY111
STA A27+73.29
INV=602.59
18" 22.5° BEND
STA A24+50.14
CARV
18" RW
STA A22+52.00STA A23+24.00
RESTRAINED
JOINTS REQ'D
STA A27+57.00STA A28+05.00
RESTRAINED
JOINTS REQ'D
S=-0.50%
S=-1.19%
S=-2.07%
S=-0.20%
S=-0.05%
STA A21+49.42
INV=599.99
STA A22+84.34
INV=600.06
18" 45° BEND
STA A22+90.95
INV=600.07
18" 45° BEND
STA A24+48.88
INV=601.94
STA A27+88.13
INV=602.90
18" 22.5° BEND
Plot Date: 4/6/2023 9:28:19 AM
SCALE
KEY MAP
PROJECT NO. LAST SAVED BY: FILE NAME:
CDA
BH
BWA
99C02
32 CIVIL
PLAN AND PROFILE ALIGNMENT A
STA A19+00 TO STA A29+00
8660F1099C02.dwg JDiDonato 8660F10
REV DATE BY DESCRIPTION
DATE
CHECKED
DRAWN
DESIGNED
8660F.10
JOB NO.
DRAWING NO.
SHEET NO.
SCALES ACCORDINGLY
VERIFY SCALES
THIS SHEET, ADJUST
IF NOT ONE INCH ON
BAR IS ONE INCH ON
ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200
CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 76832
Know what's below.
Callbefore you dig.
MATCH LINE STA 19+00 SEE DWG 99C01
MATCH LINE STA 29+00 SEE DWG 99C03
1 1 1 1 1
2 KEY NOTES:
1. VERTICAL BEND ACHIEVED BY PULLING JOINTS IN
PIPE. MAXIMUM ALLOWED DEFLECTION IS HALF
OF THE MANUFACTURER'S SPECIFIED
DEFLECTION CONTRACTOR MAY DEFLECT MORE
THAN ONE JOINT TO ACHIEVE TOTAL
DEFLECTION.
2. LOCATE ARV MINIMUM 15 FEET FROM SANITARY
SEWER.
GENERAL NOTES:
1. THE CONTRACTOR SHALL ASSUME THAT ANY
VERTICAL BENDS SHOWN ARE ROTATED FROM
CORRESPONDING HORIZONTAL BENDS UNLESS
NOTED OTHERWISE.
2. CONTRACTOR TO VERIFY ALL UTILITY CROSSINGS
PRIOR TO CONSTRUCTION.
ORR STREET
#
BRUSH STREET
THIS SHEET
FILE:
PLAN
8660F1001C102
PROFILE
FILE: 8660F1001C102
(HORIZ)
0 2' 4' 8'
SCALE: 1" = 4'
0 20' 40' 80'
SCALE: 1" = 40'
(VERT)
KEY MAP
NORTH
Digitally signed by Brian W. Avon
Contact Info: Carollo Engineers, Inc.
Date: 2023.04.10 09:07:39-07'00'
EX 15" SS
EX 6" SS
EX 15" SS
A29+00 A30+00
A31+00 A32+00 A33+00 A34+00 A35+00 A36+00 A37+00 A38+00 A39+00
EX 12" RW
EX 12" W EX OHW
EX OHW
EX OHW
EX T
EX W
EX T
EX E EX T
EX 15" SS
EX E
EX OHW
EX E
EX T
EX OHW
EX 12" W
EX OHW
EX OHW
EX T
EX T
EX 10"x18" SD
EX 12" SS
EX W
STA A33+84.31
N=2186280.61
E=6219741.18
2-18" 90° VERT BEND
STA A32+26.17
N=2186280.65
E=6219899.32
2-18" 90° VERT BEND
STA A30+36.30
N=2186296.93
E=6220082.45
18" 45° BEND
STA A30+59.21
N=2186280.70
E=6220066.28
18" 45° BEND
LIVE OAK AVE
N BUSH ST
LOW GAP RD
LOW GAP RD
592
596
600
604
608
612
616
620
624
592
596
600
604
608
612
616
620
624
A29+00 A30+00 A31+00 A32+00 A33+00 A34+00 A35+00 A36+00 A37+00 A38+00 A39+00
EXISTING GRADE
144.99 LF OF 30" STEEL CASING
TYP
CY165
NORTH COAST
RAILWAY AUTHORITY
STA A29+28.30
INV=605.79
EX 15" SS
INV=597.7±
EX 6" SS
INV=604.9±
STA A32+26.17
INV=606.80
18" 90° VERT BEND
STA A33+84.31
INV=605.10
18" 90° VERT BEND
EX 18" SD
INV=610.5±
EX W
INV=609.7±
EX T
INV=611.7±
EX GAS
INV=608.6±
EX W LATERAL
INV=608.2±
EX T
INV=608.1±
EX W
INV=609.0±
EX GAS
INV=609.4±
EX GAS
INV=610.5±
EX W
INV=613.2±
EX 12" SS
INV=600.8±
EX 12" SS
INV=601.2±
STA A33+81.77
BLOWOFF
160 LF OF EX 12" DR18
STA A32+24.00
CARV
STA A35+40.02
CARV
STA A37+39.00
BLOW OFF
18'' RW
EX 15 ' SS
INV=601.9±
EX 18" SD
INV=608.5±
S=-0.34%
S=0.91%
STA A30+36.30
INV=606.16
18" 45° BEND
STA A30+59.21
INV=606.23
18" 45° BEND
STA=A31+79.82
18" BFV
STA A32+26.17
INV=598.24
18" 90° VERT BEND
STA A33+84.31
INV=598.24
18" 90° VERT BEND
STA=A34+19.82
18" BFV
STA A35+39.82
INV=605.10
STA A37+40.40
INV=603.67
18" x 12" RED
TIE-IN TO
EXISTING LINE
S=-0.08%
STA A37+00.00
INV=603.65
Plot Date: 4/7/2023 9:51:18 AM
SCALE
KEY MAP
PROJECT NO. LAST SAVED BY: FILE NAME:
CDA
BH
JM
99C03
33 CIVIL
PLAN AND PROFILE ALIGNMENT A
STA A29+00 TO STA A39+00
8660F1099C03.dwg JDiDonato 8660F10
REV DATE BY DESCRIPTION
DATE
CHECKED
DRAWN
DESIGNED
8660F.10
JOB NO.
DRAWING NO.
SHEET NO.
SCALES ACCORDINGLY
VERIFY SCALES
THIS SHEET, ADJUST
IF NOT ONE INCH ON
BAR IS ONE INCH ON
ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200
CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 76832
Know what's below.
Callbefore you dig.
JACKING PIT
RECEIVING PIT
MATCH LINE STA 29+00 SEE DWG 99C02MATCH LINE STA 39+00 SEE DWG 99C04 2 2
3 TIE-IN TO EXISTING
12" RW PIPELINE
4 4
INSTALL 321 LF OF 18" FPVC DR 18
STA A29+11
STA A37+40
TYP
CY745 CARV
18" BFV
TYP
CY715
BLOW
TYP OFF
CY733
18" BFV
TYP
CY715
CARV
TYP
CY745
BLOW
TYP OFF
CY733
1 KEY NOTES:
1. SEE CITY AS BUILTS FOR EXISTING 12" RW
ALIGNMENT INFORMATION. CONTRACTOR SHALL
CONFIRM EXISTING JOINT RESTRAINT PRIOR TO
OPEN CUT EXCAVATION. IF JOINT RESTRAINT IS
NOT PRESENT, CONTRACTOR SHALL INSTALL
JOINT RESTRAINTS OF SUFFICIENT LENGTH.
2. VERTICAL BEND ACHIEVED BY PULLING JOINT IN
PIPE. MAXIMUM ALLOWED DEFLECTION IS HALF
OF THE MANUFACTURER'S SPECIFIED
DEFLECTION. CONTRACTOR MAY DEFLECT MORE
THAN ONE JOINT TO ACHIEVE TOTAL
DEFLECTION.
3. MAINTAIN MINIMUM 12 FT CLEARANCE BETWEEN
GRADE AND TOP OF CASING.
4. CONTRACTOR TO VERIFY EXACT TIE-IN LOCATION
TO EXISTING 12 INCH RW LINE PRIOR TO
CONSTRUCTION.
5. REMOVE EXISTING CAP.
GENERAL NOTES:
1. CONTRACTOR TO DETERMINE FINAL JACKING
AND RECEIVING PIT SIZE.
2. CONTRACTOR TO VERIFY ALL UTILITY CROSSINGS
PRIOR TO CONSTRUCTION.
3. THE CONTRACTOR SHALL ASSUME THAT ANY
VERTICAL BENDS SHOWN ARE ROTATED FROM
CORRESPONDING HORIZONTAL BENDS UNLESS
NOTED OTHERWISE.
BRUSH STREET
5 INSTALL 11 LF OF 18" PVC DR 18
INSTALL 145 LF OF 18" FPVC DR 18 INSTALL 362 LF OF 18" FPVC DR 18
MAZZONI STREET
THIS SHEET
2 5
TYP
CY165
TYP
CY111
TYP
CY111 TYP
CY111
FILE:
PLAN
8660F1001C102
PROFILE
FILE: 8660F1001C102
(HORIZ)
0 2' 4' 8'
SCALE: 1" = 4'
0 20' 40' 80'
SCALE: 1" = 40'
(VERT)
KEY MAP
NORTH
#
Digitally signed by Brian W. Avon
Contact Info: Carollo Engineers, Inc.
Date: 2023.04.10 09:07:53-07'00'
EX 12" SS
EX 16"X29" SS
EX 10"X18" SD
EX 6" SS
A39+00 A40+00 A41+00
A42+00 A43+00 A44+00
EX 12" RW A45+00 A46+00 A47+00 A48+00 A49+00
EX 12" W
EX 18" SD
EX W EX T EX OHW
EX 10" SS
EX W
EX W
EX 6" SS
EX OHW
EX OHW EX OHW
EX 6" SS
EX OHW
EX 16" W
EX G
EX T EX W EX W
EX OHW
EX E
EX OHW
STA A44+09.91
N=2186293.39
E=6218725.04
18" 45° BEND
STA A44+30.23
N=2186278.96
E=6218710.47
18" 45° BEND
18" RW
STA A43+93.86
N=2186293.20
E=6218741.08
18" x 12" RED
LIVE OAK AVE
N BUSH ST
LOW GAP RD
LOW GAP RD
616
620
624
628
632
636
640
644
648
616
620
624
628
632
636
640
644
648
A39+00 A40+00 A41+00 A42+00 A43+00 A44+00 A45+00 A46+00 A47+00 A48+00 A49+00
EXISTING GRADE
EXISTING 12" CITY LINE EXTENDS
BELOW DRAWING DATUM (NOTE 1)
EX 12" SS
INV=628.0±
EX E
INV=616.4±
EX GAS
INV=624.6±
EX W LATERAL
INV=625.0±
EX W LATERAL
INV=626.6±
EX W LATERAL
INV=627.3±
EX 6" SS
INV=627.7±
EX GAS
INV=628.3±
EX W
INV=628.4±
EX 6" SS
INV=630.1±
EX W LATERAL
INV=630.2±
EX E
INV=631.7±
EX 6" SS
INV=634.5±
EX W LATERAL
INV=634.8±
EX W LATERAL
INV=636.0±
EX E
INV=636.1±
EX W LATERAL
INV=636.6±
EX GAS
INV=636.6±
EX W LATERAL
INV=637.6±
EX W LATERAL
INV=638.4±
EX W LATERAL
INV=639.0±
EX W LATERAL
INV=639.2±
EX GAS
INV=639.2±
INSTALL 506 LF OF 18" PVC DR 18
TYP
CY111
RESTRAINED JOINTS REQUIRED
STA A47+77.30
CARV
S=-2.39%
S=-1.26%
490 LF OF EX 12" PVC
STA A43+96.00
CARV
STA A43+93.86
INV=630.83
18" x 12" RED
TIE-IN TO
EXISTING RW LINE
STA A44+09.91
INV=630.85
18" 45° BEND
STA A44+30.23
INV=630.85
18" 45° BEND
STA=A44+59.82
18" BFV
STA A45+86.92
INV=634.61
STA A47+25.36
INV=636.36
STA A47+77.12
INV=636.36
S=-1.72%
Plot Date: 4/7/2023 9:52:35 AM
SCALE
KEY MAP
PROJECT NO. LAST SAVED BY: FILE NAME:
CDA
BH
JM
99C04
34 CIVIL
PLAN AND PROFILE ALIGNMENT A
STA A39+00 TO STA A49+00
8660F1099C04.dwg JDiDonato 8660F10
REV DATE BY DESCRIPTION
DATE
CHECKED
DRAWN
DESIGNED
8660F.10
JOB NO.
DRAWING NO.
SHEET NO.
SCALES ACCORDINGLY
VERIFY SCALES
THIS SHEET, ADJUST
IF NOT ONE INCH ON
BAR IS ONE INCH ON
ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200
CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 76832
Know what's below.
Callbefore you dig.
MATCH LINE STA A39+00 SEE DWG 99C03
MATCH LINE STA A49+00 SEE DWG 99C05
2 1 1 1
EXISTING WATER VALVE -
CONTRACTOR TO VERIFY
LOCATION
CARV
TYP
CY745
18" BFV
TYP
CY715
CARV
TYP
CY745
4 5
KEY NOTES:
1. VERTICAL BEND ACHIEVED BY PULLING JOINT IN
PIPE. MAXIMUM ALLOWED DEFLECTION IS HALF
OF THE MANUFACTURER'S SPECIFIED
DEFLECTION. CONTRACTOR MAY DEFLECT MORE
THAN ONE JOINT TO ACHIEVE TOTAL
DEFLECTION.
2. CONTRACTOR TO VERIFY EXACT TIE-IN LOCATION
TO EXISTING 12 INCH RW LINE PRIOR TO
CONSTRUCTION. CONTRACTOR SHALL CONFIRM
EXISTING JOINT RESTRAINT PRIOR TO OPEN CUT
EXCAVATION. IF JOINT RESTRAINT IS NOT
PRESENT, CONTRACTOR SHALL INSTALL JOINT
RESTRAINTS OF SUFFICIENT LENGTH.
3. REMOVE EXISTING CAP.
4. SEE CITY AS BUILTS FOR EXISTING 12" RW
ALIGNMENT AND PIPE INFORMATION.
5. VERTICAL BEND ACHIEVED BY ROLLING
HORIZONTAL BEND.
GENERAL NOTES:
1. SEE CITY AS BUILTS FOR EXISTING 12 INCH RW
ALIGNMENT AND PIPE INFORMATION.
2. CONTRACTOR TO VERIFY ALL UTILITY CROSSINGS
PRIOR TO CONSTRUCTION.
3. THE CONTRACTOR SHALL ASSUME THAT ANY
VERTICAL BENDS SHOWN ARE ROTATED FROM
CORRESPONDING HORIZONTAL BENDS UNLESS
NOTED OTHERWISE.
3 STA A43+95
STA A49+80
LOW GAP RD
N STATE ST
EX E EX G
THIS SHEET
FILE:
PLAN
8660F1001C102
PROFILE
FILE: 8660F1001C102
(HORIZ)
0 2' 4' 8'
SCALE: 1" = 4'
0 20' 40' 80'
SCALE: 1" = 40'
(VERT)
KEY MAP
NORTH
#
Digitally signed by Brian W. Avon
Contact Info: Carollo Engineers, Inc.
Date: 2023.04.10 09:08:08-07'00'
A49+00
A50+00
A51+00
A52+00 A53+00 A54+00 A55+00 A56+00 A57+00 A58+00 A59+00 B10+00
B11+00
C10+00
C11+00
C12+00
EX 8" SS
EX 8" SS EX 6" SS
EX 12" SS
EX 8" SS
EX 12" SD
EX 6" SS EX 18" SD
EX E
EX T
EX OHW
EX 6" SS
EX 16" W
EX W
EX OHW
EX E
EX CATV
EX T
EX 10" W
EX E
EX G
EX 6" SS
EX 12" W
EX OHW
EX W
EX E
EX T
EX E
EX T
EX 16" W
EX 8" W EX E
STA A51+26.74
N=2186297.53
E=6218023.16
18" 11.25° BEND
18" RW
STA A57+58.79
N=2186489.35
E=6217421.45
18"x6" RED WYE
STA A57+75.22
N=2186494.58
E=6217405.87
18"x12" RED TEE
10'' RW
12" RW
6" RW
EX 12" SS
STA A49+97.45
N=2186275.60
E=6218143.26
18" 45° BEND
STA A50+29.13
N=2186297.91
E=6218120.77
18" 45° BEND
STA A51+99.29
N=2186311.12
E=6217951.84
18" 11.25° BEND
LIVE OAK AVE
N BUSH ST
LOW GAP RD
LOW GAP RD
628
632
636
640
644
648
652
656
660
628
632
636
640
644
648
652
656
660
A49+00 A50+00 A51+00 A52+00 A53+00 A54+00 A55+00 A56+00 A57+00 A58+00 A59+00
EXISTING GRADE
STA A51+26.74
INV=638.55
18" 11.25° BEND
STA A57+58.79
INV=643.79
18"x6" RED WYE
EX W
INV=639.7±
EX T
INV=638.3±
EX GAS
INV=640.1±
EX E
INV=640.5±
EX 8" SS
INV=639.2±
EX GAS
INV=640.2±
EX W LATERAL
INV=640.5±
EX 12" SS
INV=635.0±
EX E
INV=640.6±
EX W LATERAL
INV=641.8±
EX W LATERAL
INV=642.8±
EX 2" GAS
INV=643.4±
STA A49+96.00
BLOW OFF
EX 6" W
INV=644.0±
EX GAS
INV=644.6±
EX 6" W
INV=646.2±
EX 6" SS
INV=646.4±
EX 2" GAS
INV=646.8±
EX 2" GAS
INV=647.5±
EX W LATERAL
INV=647.0±
EX GAS
INV=646.8±
STA A57+45.96
CARV
EX COMM
INV=648.5±
EX 18" SD
INV=648.5±
EX E
INV=649.3±
EX 8" W
INV=647.9±
EX 8" SS
INV=648.8±
EX 10" W
INV=646.9±
EX E
INV=646.1±
EX GAS
INV=648.2±
TYP
CY111
STA A51+99.29
INV=639.82
18" 11.25° BEND
S=-6.21%
S=-1.79%
S=-1.04%
S=-1.72%
S=-0.51%
S=-0.31% S=0.06%
STA A49+60STA A50+60STA A51+18STA A51+35STA A51+90STA A52+10
EX G
INV=640.0±
EX G
INV=640.0±
STA A55+20
STA A49+97.45
INV=632.58
18" 45° BEND
STA A50+29.13
INV=632.58
18" 45° BEND
STA A54+59.82
INV=642.51
STA A56+39.82
INV=643.42
STA=A57+39.82
18" BFV
STA A57+75.22
INV=643.84
18"x12" RED TEE
STA A58+13.22
INV=643.82
18" x 10" RED
STA A58+69.82
INV=644.13
S=0.08% S=0.06%
RESTRAINED JOINTS REQ'D
INSTALL 914 LF OF 18" PVC DR18
INSTALL 87 LF OF 10" PVC DR18
RESTRAINED
JOINTS REQ'D
RESTRAINED
RESTRAINED JOINTS REQ'D JOINTS REQ'D
Plot Date: 4/6/2023 9:33:17 AM
SCALE
KEY MAP
PROJECT NO. LAST SAVED BY: FILE NAME:
CDA
BH
BWA
99C05
35 CIVIL
PLAN AND PROFILE ALIGNMENT A
STA A49+00 TO STA A59+00
8660F1099C05.dwg JDiDonato 8660F10
REV DATE BY DESCRIPTION
DATE
CHECKED
DRAWN
DESIGNED
8660F.10
JOB NO.
DRAWING NO.
SHEET NO.
SCALES ACCORDINGLY
VERIFY SCALES
THIS SHEET, ADJUST
IF NOT ONE INCH ON
BAR IS ONE INCH ON
ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200
CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 76832
MATCH LINE STA A59+00 SEE DWG 99C06
MATCH LINE STA A49+00 SEE DWG 99C04
Know what's below.
Callbefore you dig.
TYP
CY111
CARV
TYP
CY745
18" BFV
TYP
CY715
BLOW
OFF TYP
CY733
2 KEY NOTES:
1. BENDS TO BE ACHIEVED BY PULLING JOINTS IN
PIPE. MAXIMUM ALLOWED DEFLECTION IS HALF
OF THE MANUFACTURER'S SPECIFIED
DEFLECTION. CONTRACTOR MAY DEFLECT MORE
THAN ONE JOINT TO ACHIEVE TOTAL
DEFLECTION.
2. VERTICAL BEND ACHIEVED BY ROLLING
HORIZONTAL BEND.
3. CONTRACTOR SHALL REPLACE ANY CURB AND
GUTTER THAT IS DAMAGED AS A RESULT OF
PIPELINE INSTALLATION. REPLACE PER CITY OF
UKIAH STANDARD SPECIFICATIONS AND SECTION
02772.
4. CONTRACTOR SHALL PROTECT EXISTING SSMH
DURING PIPELINE INSTALLATION. REPLACE IF
DAMAGED. ADJUST PIPELINE ALIGNMENT AS
REQUIRED.
5. CONTRACTOR SHALL PROTECT EXISTING VALVE
DURING PIPELINE INSTALLATION. REPLACE IF
DAMAGED. ADJUST PIPELINE ALIGNMENT AS
REQUIRED.
GENERAL NOTES:
1. CONTRACTOR TO VERIFY ALL UTILITY CROSSINGS
PRIOR TO CONSTRUCTION.
2. CONTRACTOR SHALL ASSUME THAT ANY
VERTICAL BENDS SHOWN ARE ROTATED FROM
CORRESPONDING HORIZONTAL BENDS UNLESS
NOTED OTHERWISE.
3. CONTRACTOR TO REPLACE ALL ROAD STRIPING
DAMAGED BY PIPELINE REPLACEMENT PER
SECTION 02762. CONTRACTOR SHALL REPLACE
ENTIRETY OF DAMAGED STRIPING. N BUSH ST
N PINE ST
N OAK ST
ELM ST
LOW GAP RD
EX 12" SS
EX G
EX OHW
EX W
THIS SHEET
2 2 2 1 1 1
3 3
3 3
3 FILE:
PLAN
8660F1001C102
PROFILE
FILE: 8660F1001C102
(HORIZ)
0 2' 4' 8'
SCALE: 1" = 4'
0 20' 40' 80'
SCALE: 1" = 40'
(VERT)
KEY MAP
NORTH
#
Digitally signed by Brian W. Avon
Contact Info: Carollo Engineers, Inc.
Date: 2023.04.10 09:08:22-07'00'
A59+00 A60+00 A61+00 A62+00 A63+00 A64+00 A65+00 A66+00 A67+00 A68+00 A69+00 EX 18" SD
EX 12" SS
EX 6" W
EX T
EX E EX E
EX T EX 8" W
EX G EX OHW
EX W
EX OHW
EX E EX OHW EX 6" W
EX G
EX E EX T
10" RW EX 8" W
LIVE OAK AVE
N BUSH ST
LOW GAP RD
LOW GAP RD
636
640
644
648
652
656
660
664
668
636
640
644
648
652
656
660
664
668
A59+00 A60+00 A61+00 A62+00 A63+00 A64+00 A65+00 A66+00 A67+00 A68+00 A69+00
EXISTING GRADE
EX W LATERAL
INV=648.8±
EX W LATERAL
INV=648.8±
EX W LATERAL
INV=648.8±
EX W
INV=648.4±
EX W
INV=648.5±
EX W LATERAL
INV=648.5±
EX 6" W
INV=648.0±
EX W LATERAL
INV=648.2±
EX GAS
INV=647.7±
EX GAS
INV=647.5±
EX W LATERAL
INV=647.6±
EX 18" SD
INV=648.1±
EX E
INV=649.5±
EX W LATERAL
INV=648.6±
EX W
INV=650.9±
EX E
INV=653.8±
EX COMM
INV=654.4±
EX 6" SS
INV=642.3±
INSTALL 1000 LF OF 10" PVC DR18
TYP
CY111
S=-0.16%
S=-0.98%
S=-0.77%
S=-2.75%
S=-3.16%
STA A62+36.40
INV=644.71
STA A64+45.81
INV=646.76
STA A66+59.03
INV=648.40
STA A67+79.03
INV=651.71
STA A59+62.00
RESTRAINED
JOINTS REQ'D
Plot Date: 4/7/2023 9:54:00 AM
SCALE
KEY MAP
PROJECT NO. LAST SAVED BY: FILE NAME:
CDA
BH
JM
99C06
36 CIVIL
PLAN AND PROFILE ALIGNMENT A
STA A59+00 TO STA A69+00
8660F1099C06.dwg JDiDonato 8660F10
REV DATE BY DESCRIPTION
DATE
CHECKED
DRAWN
DESIGNED
8660F.10
JOB NO.
DRAWING NO.
SHEET NO.
SCALES ACCORDINGLY
VERIFY SCALES
THIS SHEET, ADJUST
IF NOT ONE INCH ON
BAR IS ONE INCH ON
ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200
CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 76832
Know what's below.
Callbefore you dig.
MATCH LINE STA A59+00 SEE DWG 99C05
MATCH LINE STA A69+00 SEE DWG 99C07
KEY NOTES:
1. BENDS TO BE ACHIEVED BY PULLING JOINTS IN
PIPE. MAXIMUM ALLOWED DEFLECTION IS HALF
OF THE MANUFACTURER'S SPECIFIED
DEFLECTION. CONTRACTOR MAY DEFLECT MORE
THAN ONE JOINT TO ACHIEVE TOTAL
DEFLECTION.
2. CONTRACTOR SHALL PROTECT EXISTING VALVE
DURING PIPELINE INSTALLATION. REPLACE IF
DAMAGED. ADJUST PIPELINE ALIGNMENT AS
REQUIRED.
3. CONTRACTOR SHALL REPLACE ANY CURB AND
GUTTER THAT IS DAMAGED AS A RESULT OF
PIPELINE INSTALLATION. REPLACE PER CITY OF
UKIAH STANDARD SPECIFICATIONS AND SECTION
02772.
GENERAL NOTES:
1. CONTRACTOR TO VERIFY ALL UTILITY CROSSINGS
PRIOR TO CONSTRUCTION.
2. CONTRACTOR SHALL ASSUME THAT ANY
VERTICAL BENDS SHOWN ARE ROTATED FROM
CORRESPONDING HORIZONTAL BENDS UNLESS
NOTED OTHERWISE.
3. CONTRACTOR TO REPLACE ALL ROAD STRIPING
DAMAGED BY PIPELINE REPLACEMENT PER
SECTION 02762. CONTRACTOR SHALL REPLACE
ENTIRETY OF DAMAGED STRIPING.
LOW GAP RD
N BUSH ST
COTTAGE LN
THIS SHEET
1 1 1 1
2 3
2 FILE:
PLAN
8660F1001C102
PROFILE
FILE: 8660F1001C102
(HORIZ)
0 2' 4' 8'
SCALE: 1" = 4'
0 20' 40' 80'
SCALE: 1" = 40'
(VERT)
KEY MAP
NORTH
#
Digitally signed by Brian W. Avon
Contact Info: Carollo Engineers, Inc.
Date: 2023.04.10 09:08:38-07'00'
LIVE OAK AVE
N BUSH ST
LOW GAP RD
LOW GAP RD
A69+00 A70+00 A71+00 A72+00 A73+00 A74+00 A75+00 A76+00 A77+00 A78+00 A79+00 EX 12" SS
EX 18" SD
EX 8" W EX OHW
EX E
EX 6" SS
EX E
EX T
EX G EX E
EX OHW EX W
EX OHW
EX W
EX W
EX W
EX OHW EX OHW EX OHW EX T
EX T
EX T
EX T
10'' RW
644
648
652
656
660
664
668
672
676
644
648
652
656
660
664
668
672
676
A69+00 A70+00 A71+00 A72+00 A73+00 A74+00 A75+00 A76+00 A77+00 A78+00 A79+00
EXISTING GRADE
EX W LATERAL
INV=661.4±
EX COMM
INV=667.5±
EX COMM
INV=667.8±
EX 18" SD
INV=666.8±
INSTALL 1000 LF OF 10" PVC DR18
TYP
CY111
STA A70+01.12
CARV
M-403
STA A70+68.30
METER TAP
STA A69+73.00
STA A72+27.00
RESTRAINED JOINTS REQ'D
S=-1.23%
S=-3.16%
S=-0.87%
S=-0.61%
S=-0.71%
STA A70+00.15
INV=658.69
STA=A70+99.82
10" GV
STA A71+59.03
INV=660.65
STA A73+29.03
INV=662.12
STA A78+49.42
INV=665.30
Plot Date: 4/7/2023 9:56:16 AM
SCALE
KEY MAP
PROJECT NO. LAST SAVED BY: FILE NAME:
CDA
BH
JM
99C07
37 CIVIL
PLAN AND PROFILE ALIGNMENT A
STA A69+00 TO STA A79+00
8660F1099C07.dwg JDiDonato 8660F10
REV DATE BY DESCRIPTION
DATE
CHECKED
DRAWN
DESIGNED
8660F.10
JOB NO.
DRAWING NO.
SHEET NO.
SCALES ACCORDINGLY
VERIFY SCALES
THIS SHEET, ADJUST
IF NOT ONE INCH ON
BAR IS ONE INCH ON
ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200
CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 76832
Know what's below.
Callbefore you dig.
MATCH LINE STA A69+00 SEE DWG 99C06
M-403
MATCH LINE STA A79+00 SEE DWG 99C08
WATER METER
CARV
TYP
CY745
TYP
CY901
10" GV
TYP
CY716
KEY NOTES:
1. BENDS TO BE ACHIEVED BY PULLING JOINTS IN
PIPE. MAXIMUM ALLOWED DEFLECTION IS HALF
OF THE MANUFACTURER'S SPECIFIED
DEFLECTION. CONTRACTOR MAY DEFLECT MORE
THAN ONE JOINT TO ACHIEVE TOTAL
DEFLECTION.
2. CONTRACTOR SHALL REPLACE ANY CURB AND
GUTTER THAT IS DAMAGED AS A RESULT OF
PIPELINE INSTALLATION. REPLACE PER CITY OF
UKIAH STANDARD SPECIFICATIONS AND SECTION
02772.
GENERAL NOTES:
1. CONTRACTOR TO VERIFY ALL UTILITY CROSSINGS
PRIOR TO CONSTRUCTION.
2. CONTRACTOR SHALL ASSUME THAT ANY
VERTICAL BENDS SHOWN ARE ROTATED FROM
CORRESPONDING HORIZONTAL BENDS UNLESS
NOTED OTHERWISE.
3. CONTRACTOR TO REPLACE ALL ROAD STRIPING
DAMAGED BY PIPELINE REPLACEMENT PER
SECTION 02762. CONTRACTOR SHALL REPLACE
ENTIRETY OF DAMAGED STRIPING.
#
LOW GAP RD
THIS SHEET
1 1 1 1
2 2
FILE:
PLAN
8660F1001C102
PROFILE
FILE: 8660F1001C102
(HORIZ)
0 2' 4' 8'
SCALE: 1" = 4'
0 20' 40' 80'
SCALE: 1" = 40'
(VERT)
KEY MAP
NORTH
Digitally signed by Brian W. Avon
Contact Info: Carollo Engineers, Inc.
Date: 2023.04.10 09:08:52-07'00'
660
664
668
672
676
680
684
688
692
660
664
668
672
676
680
684
688
692
A79+00 A80+00 A81+00 A82+00 A83+00 A84+00 A85+00 A86+00 A87+00 A88+00 A89+00
EXISTING GRADE
INSTALL 1000 LF OF 10" PVC DR18
TYP
CY111
EX GAS
INV=668.2±
EX COMM
INV=669.5±
EX E
INV=669.6±
EX COMM
INV=669.6±
STA A82+60.00
INV=677.48
STA A83+50.00
INV=679.83
STA A84+70.00
INV=681.12
STA A87+20.00
INV=682.47
STA A87+20.00
CARV
M-404
STA A87+86.48
METER TAP
S=-0.71% S=-6.43%
S=-4.32%
S=-2.61%
S=-1.08%
S=-0.54%
S=-0.18% S=-0.18%
RESTRAINED JOINTS REQ'D
STA=A88+59.82
10" GV
RESTRAINED JOINTS REQ'D STA A80+05.15 INV=666.40 10" 90° BEND STA A80+18.19 INV=667.14 10" 11.25° BEND STA A79+60.00
STA A80+50.00STA A87+30.00
A79+00
A80+00
A81+00 A82+00 A83+00 A84+00 A85+00 A86+00 A87+00 A88+00 A89+00 EX 6" SS
EX 8" W
EX CATV
EX E
EX T
EX G
EX CATV
EX 8" W
EX E
EX T
EX E
EX OHW
10'' RW
STA A80+05.15
N=2187204.12
E=6215291.84
10" 90° BEND
STA A80+18.19
N=2187216.29
E=6215296.52
10" 11.25° BEND
EX G
10+00 9+0 11+00 12+00 13+00 14+00 14+41.55
LIVE OAK AVE
N BUSH ST
LOW GAP RD
LOW GAP RD
Plot Date: 4/7/2023 10:02:34 AM
SCALE
KEY MAP
PROJECT NO. LAST SAVED BY: FILE NAME:
CDA
BH
BWA
99C08
38 CIVIL
PLAN AND PROFILE ALIGNMENT A
STA A79+00 TO STA A89+00
8660F1099C08.dwg JDiDonato 8660F10
M-404
WATER
METER
REV DATE BY DESCRIPTION
DATE
CHECKED
DRAWN
DESIGNED
8660F.10
JOB NO.
DRAWING NO.
SHEET NO.
SCALES ACCORDINGLY
VERIFY SCALES
THIS SHEET, ADJUST
IF NOT ONE INCH ON
BAR IS ONE INCH ON
ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200
CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 76832
Know what's below.
Callbefore you dig.
MATCH LINE STA A79+00 SEE DWG 99C07
MATCH LINE STA A89+00 SEE DWG 99C09
TYP
CY901
CARV
TYP
CY745 10" GV
TYP
CY716
KEY NOTES:
1. BENDS TO BE ACHIEVED BY PULLING JOINTS IN
PIPE. MAXIMUM ALLOWED DEFLECTION IS HALF
OF THE MANUFACTURER'S SPECIFIED
DEFLECTION. CONTRACTOR MAY DEFLECT MORE
THAN ONE JOINT TO ACHIEVE TOTAL
DEFLECTION.
2. VERTICAL BEND ACHIEVED BY ROLLING
HORIZONTAL BEND.
GENERAL NOTES:
1. CONTRACTOR TO VERIFY ALL UTILITY CROSSINGS
PRIOR TO CONSTRUCTION.
2. CONTRACTOR SHALL ASSUME THAT ANY
VERTICAL BENDS SHOWN ARE ROTATED FROM
CORRESPONDING HORIZONTAL BENDS UNLESS
NOTED OTHERWISE.
3. CONTRACTOR TO REPLACE ALL ROAD STRIPING
DAMAGED BY PIPELINE REPLACEMENT PER
SECTION 02762. CONTRACTOR SHALL REPLACE
ENTIRETY OF DAMAGED STRIPING.
#
DESPINA DR
LOW GAP RD
THIS SHEET
2 2 1 1 1 1
FILE:
PLAN
8660F1001C102
PROFILE
FILE: 8660F1001C102
(HORIZ)
0 2' 4' 8'
SCALE: 1" = 4'
0 20' 40' 80'
SCALE: 1" = 40'
(VERT)
KEY MAP
NORTH
Digitally signed by Brian W. Avon
Contact Info: Carollo Engineers, Inc.
Date: 2023.04.10 09:09:07-07'00'
A89+00 A89+55.99
10+00 9+0 11+00 12+00 13+00 14+00 14+41.55
LIVE OAK AVE
N BUSH ST
LOW GAP RD
LOW GAP RD
668
672
676
680
684
688
692
696
700
668
672
676
680
684
688
692
696
700
A89+00 A90+00 A90+40
EXISTING GRADE
10 INCH
RESTRAINED
CAP
M-405
STA A89+54.00
METER TAP
STA A89+56.01
INV 682.89
STA A89+50.00
CARV
Plot Date: 4/7/2023 8:45:47 AM
SCALE
KEY MAP
PROJECT NO. LAST SAVED BY: FILE NAME:
CDA
BH
BWA
99C09
39 CIVIL
PLAN AND PROFILE ALIGNMENT A
STA A89+00 TO STA A89+55.99
8660F1099C09.dwg JDiDonato 8660F10
REV DATE BY DESCRIPTION
DATE
CHECKED
DRAWN
DESIGNED
8660F.10
JOB NO.
DRAWING NO.
SHEET NO.
SCALES ACCORDINGLY
VERIFY SCALES
THIS SHEET, ADJUST
IF NOT ONE INCH ON
BAR IS ONE INCH ON
ORIGINAL DRAWING 0 1"
APRIL 2023 OF 200
CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
123456789 10 11 12 13
ABCDEF
123456789 10 11 12 13
ABCDEFG
G
®
No. 76832
Know what's below.
Callbefore you dig.
MATCH LINE STA A89+00 SEE DWG 99C08
M-405
WATER METER TYP
CY901
INSTALL 58 LF OF
10" PVC DR18
RESTRAINED
JOINTS REQUIRED
CARV
TYP
CY745
GENERAL NOTES:
1. CONTRACTOR TO VERIFY ALL UTILITY CROSSINGS
PRIOR TO CONSTRUCTION.
STA A89+58
DESPINA DR
TYP
CPY111
THIS SHEET
FILE:
PLAN
8660F1001C102
PROFILE
FILE: 8660F1001C102
(HORIZ)
0 2' 4' 8'
SCALE: 1" = 4'
0 20' 40' 80'
SCALE: 1" = 40'
(VERT)
KEY MAP
NORTH
Digitally signed by Brian W. Avon
Contact Info: Carollo Engineers, Inc.
Date: 2023.04.10 09:09:22-07'00'
A57+00
A58+00
A59+00
C10+00
EX 8" SS EX 12" SD
EX 12" SD EX 12" SD
EX 12" SS
EX 6" SS
EX 12" SS
EX 8" SS
EX 18" SD
EX 8" W
EX CATV
EX T
EX E
EX E
EX E
EX CATV
EX T EX G EX E
EX G
EX E
STA B10+18.72
N=2186506.10
E=6217413.11
6" 11.25° BEND
STA B10+00
N=2186489.35
E=6217421.45
18"x6" RED WYE
B10+00 B11+00 B12+00 B13+00 B14+00 B15+00 B16+00 B17+00 B18+00 B19+00
LIVE OAK AVE
N BUSH ST
LOW GAP RD
LOW GAP RD
636
640
644
648
652
656
660
664
668
636
640
644
648
652
656
660
664
668
B9+00 B10+00 B11+00 B12+00 B13+00 B14+00 B15+00 B16+00 B17+00 B18+00 B19+00 STA B10+00 INV=643.79 18"x6" RED WYE
EXISTING GRADE
EX E
INV=648.6±
EX 12" SD
INV=648.6±
EX 6" W
INV=647.8±
EX CATV
INV=649.4±
EX COMM
INV=649.6±
EX E
INV=650.0±
EX E
INV=651.4±
EX GAS
INV=654.0±
EX E
INV=655.2±
STA A14+84.40
INV=649.47
STA A18+25.90
INV=651.50
INSTALL 1000 LF OF 6" PVC DR18
TYP
CY111
STA B18+25.90
CARV
S=-1.18%
S=-0.59%
S=0.97%
STA B10+09.94
BLOW OFF
RESTRAINED JOINTS REQ'D
RESTRAINED
JOINTS REQ'D
STA B10+00.00STA B10+60.00
STA B10+18.72
INV=644.290
6" 11.25° BEND
STA=B10+606" GV
STA B18+90.00
Plot Date: 4/7/2023 10:04:51 AM
SCALE
KEY MAP
PROJECT NO. LAST SAVED BY: FILE NAME:
CDA
BH
BWA
99C10
40 CIVIL
PLAN AND PROFILE ALIGNMENT B
STA B9+00 TO STA B19+00
8660F1099C10.dwg JDiDonato 8660F10
REV DATE BY DESCRIPTION
DATE
CHECKED
DRAWN
DESIGNED
8660F.10
JOB NO.
DRAWING NO.
SHEET NO.
SCALES ACCORDINGLY
VERIFY SCALES
THIS SHEET, ADJUST
IF NOT ONE INCH ON
BAR IS ONE INCH ON
ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200
CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 76832
Know what's below.
Callbefore you dig.
MATCH LINE STA B19+00 SEE DWG 99C11
1 1
BLOW
OFF TYP
CY733
6" GV
TYP
CY716
BIKE LANE STRIPING
CARV
TYP
CY745
2 N BUSH ST
LOW GAP RD
THIS SHEET
KEY NOTES:
1. BENDS TO BE ACHIEVED BY PULLING JOINTS IN
PIPE. MAXIMUM ALLOWED DEFLECTION IS HALF
OF THE MANUFACTURER'S SPECIFIED
DEFLECTION. CONTRACTOR MAY DEFLECT MORE
THAN ONE JOINT TO ACHIEVE TOTAL
DEFLECTION.
2. VERTICAL BEND ACHIEVED BY ROLLING
HORIZONTAL BEND.
GENERAL NOTES:
1. CONTRACTOR TO VERIFY ALL UTILITY CROSSINGS
PRIOR TO CONSTRUCTION.
2. CONTRACTOR SHALL ASSUME THAT ANY
VERTICAL BENDS SHOWN ARE ROTATED FROM
CORRESPONDING HORIZONTAL BENDS UNLESS
NOTED OTHERWISE.
3. CONTRACTOR TO REPLACE ALL ROAD STRIPING
DAMAGED BY PIPELINE REPLACEMENT PER
SECTION 02762. CONTRACTOR SHALL REPLACE
ENTIRETY OF DAMAGED STRIPING.
#
FILE:
PLAN
8660F1001C102
PROFILE
FILE: 8660F1001C102
(HORIZ)
0 2' 4' 8'
SCALE: 1" = 4'
0 20' 40' 80'
SCALE: 1" = 40'
(VERT)
KEY MAP
NORTH
Digitally signed by Brian W. Avon
Contact Info: Carollo Engineers, Inc.
Date: 2023.04.10 09:09:37-07'00'
640
644
648
652
656
660
664
668
672
640
644
648
652
656
660
664
668
672
B19+00 B20+00 B21+00 B22+00 B23+00 B24+00 B25+00 EX COMM INV=654.6± EX W LATERAL INV=651.2± EX W LATERAL INV=650.6± EX W LATERAL INV=650.2± EX W LATERAL INV=649.6± EX W LATERAL INV=649.2± STA B22+69.11 INV=647.182 6" 90° BEND STA B23+88.90 INV=647.710 6" 11.25° BEND STA B22+69.00 BLOW OFF INSTALL 516 LF OF 6" PVC DR18
TYP
CY111
EXISTING GRADE
M-402
STA B19+70.00
METER TAP
STA B19+94.81
INV=650.090
6" 45° BENDSTA B24+16.24
INV=648.310
6" RESTRAINED CAP
6" RW
EX GAS
INV=652.2±
S=1.06%
S=0.44%
S=2.20%
RESTRAINED JOINTS REQUIRED
RESTRAINED
JOINTS REQUIRED
RESTRAINED
JOINTS REQUIRED
S=0.96%
STA B19+71.65
INV=650.090
6" 45° WYE
STA=B20+406" GV
M-401
STA B24+13.00
METER TAP
STA B24+16.00CARV
STA B21+20.00STA B22+40.00STA B23+00.00STA B23+35.00STA B24+16.00
EX G
EX T
EX G
EX 8" W EX G
EX G
EX 6" SS
EX 6" W
EX 8" W
EX G EX 6" SS
EX G EX 6" W
EX G
STA B19+71.65
N=2187447.98
E=6217274.06
6" 45° WYE
STA B19+94.81
N=2187465.23
E=6217289.50
6" 45° BEND
STA B22+69.11
N=2187485.50
E=6217563.05
6" 90° BEND
STA B23+88.90
N=2187366.08
E=6217572.50
6" 11.25° BEND
6" RW
6" RWB24+16.34
B18+00 B19+00
B20+00 B21+00 B22+00
B23+00
B24+00
LIVE OAK AVE
N BUSH ST
LOW GAP RD
LOW GAP RD
Plot Date: 4/7/2023 8:47:31 AM
SCALE
KEY MAP
PROJECT NO. LAST SAVED BY: FILE NAME:
CDA
BH
BWA
99C11
41 CIVIL
PLAN AND PROFILE ALIGNMENT B
STA B19+00 TO STA B24+16.34
8660F1099C11.dwg JDiDonato 8660F10
REV DATE BY DESCRIPTION
DATE
CHECKED
DRAWN
DESIGNED
8660F.10
JOB NO.
DRAWING NO.
SHEET NO.
SCALES ACCORDINGLY
VERIFY SCALES
THIS SHEET, ADJUST
IF NOT ONE INCH ON
BAR IS ONE INCH ON
ORIGINAL DRAWING 0 1"
APRIL 2023 OF 200
CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
123456789 10 11 12 13
ABCDEF
123456789 10 11 12 13
ABCDEFG
G
®
No. 76832
Know what's below.
Callbefore you dig.
MATCH LINE STA B19+00 SEE DWG 99C10
PROJECT NO. LAST SAVED BY: FILE NAME:
CDA
BH
BWA
99C11
41 CIVIL
PLAN AND PROFILE ALIGNMENT B
STA B19+00 TO STA B24+16.34
8660F1099C11.dwg JDiDonato 8660F10
M-401
WATER
METER
TYP
CY901
M-402
WATER
METER TYP
CY901
6" RESTRAINED CAP
6" GV
TYP
CY716
BLOW
TYP OFF
CY733
CARV
TYP
CY745
6" RESTRAINED CAP
2222
KEY NOTES:
1. VERTICAL BEND TO BE ACHIEVED BY PULLED
PIPE. MAXIMUM ALLOWED DEFLECTION IS HALF
OF THE MANUFACTURER'S SPECIFIED
DEFLECTION. CONTRACTOR MAY DEFLECT MORE
THAN ONE JOINT TO ACHIEVE TOTAL
DEFLECTION.
2. VERTICAL BEND ACHIEVED BY ROLLING
HORIZONTAL BEND.
3. CONTRACTOR SHALL REPLACE ANY CURB AND
GUTTER THAT IS DAMAGED AS A RESULT OF
PIPELINE INSTALLATION. REPLACE PER CITY OF
UKIAH STANDARD SPECIFICATIONS AND SECTION
02772.
GENERAL NOTES:
1. CONTRACTOR TO VERIFY ALL UTILITY CROSSINGS
PRIOR TO CONSTRUCTION.
2. CONTRACTOR SHALL ASSUME THAT ANY
VERTICAL BENDS SHOWN ARE ROTATED FROM
CORRESPONDING HORIZONTAL BENDS UNLESS
NOTED OTHERWISE.
3. CONTRACTOR TO REPLACE ALL ROAD STRIPING
DAMAGED BY PIPELINE REPLACEMENT PER
SECTION 02762. CONTRACTOR SHALL REPLACE
ENTIRETY OF DAMAGED STRIPING.
#
ARLINGTON DR LOCKWOOD DR
N BUSH ST
N PINE ST
THIS SHEET
3 3
3 3
FILE:
PLAN
8660F1001C102
PROFILE
FILE: 8660F1001C102
(HORIZ)
0 2' 4' 8'
SCALE: 1" = 4'
0 20' 40' 80'
SCALE: 1" = 40'
(VERT)
KEY MAP
NORTH
Digitally signed by Brian W. Avon
Contact Info: Carollo Engineers, Inc.
Date: 2023.04.10 09:09:53-07'00'
19+00 0+0 11+0 12+00 13+00 14+00 14+41.55
LIVE OAK AVE
N BUSH ST
LOW GAP RD
LOW GAP RD
624
628
632
636
640
644
648
652
656
624
628
632
636
640
644
648
652
656
C9+00 C10+00 C11+00 C12+00 C13+00 C14+00 C15+00 C16+00 C17+00 C18+00 C19+00 TYP
CY111
EXISTING GRADE
INSTALL 1000 LF OF 12" PVC DR18
RESTRAINED JOINTS REQ'D RESTRAINED JOINTS REQUIRED
S=0.37% S=0.41% S=0.39%
S=1.18%
S=2.83%
S=2.96%
S=10.69%
S=0.12% S=0.03% S=0.91%
S=0.56%
EX 6" SS
INV=633.7±
EX 8" SS
INV=647.7±
EX 12" W
INV=647.4±
EX E
INV=649.1±
EX GAS
INV=647.8±
EX COMM
INV=648.2±
EX W (HYD)
INV=646.3±
EX COMM
INV=646.3±
EX GAS
INV=646.0±
EX W (HYD)
INV=644.2±
EX W (HYD)
INV=638.9±
EX W
INV=638.2±
EX GAS
INV=638.1±
EX 18" SD
INV=635.5±
EX 12" SD
INV=635.5±
EX 6" SS
INV=639.6±
STA C11+40.61
INV=643.56
STA C11+20.00
CARV
STA C16+12.37
CARV
M-406
STA C16+50.00
METER TAP
STA C10+62.34
INV=643.70
12" 45° BEND
STA C14+60.64
INV=638.79
STA C16+45.06
INV=630.89
12" 11.25° BEND
STA C16+56.80
INV=630.89
12" 45° BEND
STA C16+79
12" GV
STA C17+00.15
INV=630.90
12" 45° BEND
STA C17+38.60
INV=631.06
STA C18+00.15
INV=630.33
12" 90° BEND
STA C12+55.00STA C15+29.00STA C18+55.40
STA C11+01.05
12" GV
STA C16+15.05
INV=634.04
12" 90° BEND
STA C10+00.00 STA C10+00.00
INV=643.92
18"x12" RED TEE
STA C14+00.60
INV=640.49
STA A57+75.22
N=2186494.58
E=6217405.87
18"x12" RED TEE
STA C10+62.34
N=2186435.49
E=6217386.03
12" 45° BEND
STA C16+15.05
N=2185892.41
E=6217488.66
12" 90° BEND
STA C16+56.80
N=2185885.48
E=6217447.51
12" 45° BEND
STA C17+00.15
N=2185850.03
E=6217422.56
12" 45° BEND
STA C18+00.15
N=2185832.92
E=6217324.03
12" 90° BEND
C10+00
C11+00
C12+00
C13+00
C14+00
C15+00
C16+00
C17+00
C18+00
C19+00
B10+00
A55+00 A56+00 A57+00 A58+00
EX 12" SS
EX 6" SS
EX 6" SS
EX 12" SD
EX 18" SD
EX 18" SD
EX T
EX G
EX OHW
EX 16" W
EX W
EX W
EX W
EX W
EX W
EX OHW
EX OHW
EX OHW
EX W
EX W
EX G
EX OHW
EX 6" SS
EX W
EX OHW
EX 18" SD
EX 6" SS
12" RW
12" GV
Plot Date: 4/7/2023 5:15:17 AM
SCALE
KEY MAP
PROJECT NO. LAST SAVED BY: FILE NAME:
CDA
BH
BWA
99C12
42 CIVIL
PLAN AND PROFILE ALIGNMENT C
STA C10+00 TO STA C19+00
8660F1099C12.dwg JDiDonato 8660F10
REV DATE BY DESCRIPTION
DATE
CHECKED
DRAWN
DESIGNED
8660F.10
JOB NO.
DRAWING NO.
SHEET NO.
SCALES ACCORDINGLY
VERIFY SCALES
THIS SHEET, ADJUST
IF NOT ONE INCH ON
BAR IS ONE INCH ON
ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200
CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 76832
Know what's below.
Callbefore you dig.
M-406
WATER
METER
2 TYP
CY901
CARV
TYP
CY745
CARV
TYP
CY745
12" GV
TYP
CY716
1 KEY NOTES:
1. VERTICAL BEND TO BE ACHIEVED BY ROTATING
HORIZONTAL BEND.
2. VERTICAL BEND TO BE ACHIEVED BY PULLED
PIPE. MAXIMUM ALLOWED DEFLECTION IS HALF
OF THE MANUFACTURER'S SPECIFIED
DEFLECTION. CONTRACTOR MAY DEFLECT MORE
THAN ONE JOINT TO ACHIEVE TOTAL
DEFLECTION.
3. CONTRACTOR SHALL REPLACE ANY CURB AND
GUTTER THAT IS DAMAGED AS A RESULT OF
PIPELINE INSTALLATION. REPLACE PER CITY OF
UKIAH STANDARD SPECIFICATIONS AND SECTION
02772.
4. CONTRACTOR SHALL PROTECT EXISTING SSMH
DURING PIPELINE INSTALLATION. REPLACE IF
DAMAGED. ADJUST PIPELINE ALIGNMENT AS
REQUIRED.
5. CONTRACTOR SHALL PROTECT EXISTING VALVE
DURING PIPELINE INSTALLATION. REPLACE IF
DAMAGED. ADJUST PIPELINE ALIGNMENT AS
REQUIRED.
GENERAL NOTES:
1. CONTRACTOR TO VERIFY ALL UTILITY CROSSINGS
PRIOR TO CONSTRUCTION.
2. CONTRACTOR SHALL ASSUME THAT ANY
VERTICAL BENDS SHOWN ARE ROTATED FROM
CORRESPONDING HORIZONTAL BENDS UNLESS
NOTED OTHERWISE.
3. CONTRACTOR TO REPLACE ALL ROAD STRIPING
DAMAGED BY PIPELINE REPLACEMENT PER
SECTION 02762. CONTRACTOR SHALL REPLACE
ENTIRETY OF DAMAGED STRIPING.
#
MATCH LINE STA C19+00 SEE DWG 99C13
LOW GAP RD
N BUSH ST
THIS SHEET
FILE:
PLAN
8660F1001C102
PROFILE
FILE: 8660F1001C102
(HORIZ)
0 2' 4' 8'
SCALE: 1" = 4'
0 20' 40' 80'
SCALE: 1" = 40'
(VERT)
KEY MAP
NORTH
TYP
CY716
4 3
5 2 2 1 1
Digitally signed by Brian W. Avon
Contact Info: Carollo Engineers, Inc.
Date: 2023.04.10 09:10:13-07'00'
620
624
628
632
636
640
644
648
652
620
624
628
632
636
640
644
648
652
C19+00 C20+00 C21+00 C22+00 C23+00 C24+00 C25+00 C26+00 C27+00 C28+00 C29+00 S=0.56% S=-0.58%
S=-0.82%
S=-0.01% S=0.01% S=0.01%
S=1.36%
STA C21+26.74
INV=628.65
12" 90° BEND
STA C21+36.62
INV=628.70
12" 11.25° BEND
STA C25+25.51
INV=631.90
12" 11.25° BEND
STA C25+98.71
12" GV
STA C27+44.72
INV=631.90
12" 11.25° BEND
STA C27+65.60
INV=631.90
EX 18" SD
INV=633.0±
STA C21+24.73
BLOW OFF
EXISTING GRADE
INSTALL 1000 LF OF 12" PVC DR18
RESTRAINED JOINTS REQ'D
STA C20+74.00STA C21+82.00
RESTRAINED JOINTS REQ'D
STA C24+49.00STA C27+70.00
STA C27+40.00
CARV
M-407
STA C24+80.00
METER TAP
TYP
CY111
STA C25+25.51
N=2185532.67
E=6216981.94
12" 11.25° BEND
STA C27+44.72
N=2185588.20
E=6216769.88
12" 11.25° BEND
C24+00
C25+00
C26+00 C27+00
C28+00
C29+00
STA C21+26.74
N=2185511.15
E=6217379.91
12" 90° BEND
STA C21+36.62
N=2185509.63
E=6217370.14
12" 11.25° BEND
12" RW 12" RW
C18+00
C19+00
C20+00
C21+00
C22+00
C23+00
C24+00
9+00
LIVE OAK AVE
N BUSH ST
LOW GAP RD
LOW GAP RD
Plot Date: 4/7/2023 5:29:43 AM
SCALE
KEY MAP
PROJECT NO. LAST SAVED BY: FILE NAME:
CDA
BH
BWA
99C13
43 CIVIL
PLAN AND PROFILE ALIGNMENT C
STA C19+00 TO STA C29+00
8660F1099C13.dwg JDiDonato 8660F10
REV DATE BY DESCRIPTION
DATE
CHECKED
DRAWN
DESIGNED
8660F.10
JOB NO.
DRAWING NO.
SHEET NO.
SCALES ACCORDINGLY
VERIFY SCALES
THIS SHEET, ADJUST
IF NOT ONE INCH ON
BAR IS ONE INCH ON
ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200
CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 76832
THIS SHEET
MATCH LINE STA C23+40 SEE LEFT
MATCH LINE STA C19+00 SEE DWG 99C12
Know what's below.
Callbefore you dig.
MATCH LINE STA C23+40 SEE RIGHT
MATCH LINE STA C29+00 SEE DWG 99C14
KEY NOTES:
1. APPROXIMATE SD LOCATION AND ELEVATION
BASED ON CITY GIS MAP. OUTFALL TO CREEK
WAS NOT FOUND IN THE FIELD. CONTRACTOR TO
FIELD VERIFY PRIOR TO CONSTRUCTION.
2. VERTICAL BEND TO BE ACHIEVED BY PULLED
PIPE. MAXIMUM ALLOWED DEFLECTION IS HALF
OF THE MANUFACTURER'S SPECIFIED
DEFLECTION. CONTRACTOR MAY DEFLECT MORE
THAN ONE JOINT TO ACHIEVE TOTAL
DEFLECTION.
GENERAL NOTES:
1. CONTRACTOR TO VERIFY ALL UTILITY CROSSINGS
PRIOR TO CONSTRUCTION.
#
BLOW
OFF TYP
CY733
M-407
WATER
METER
TYP
CY901
1 EX-18" SD
TYP
CY715
CARV
TYP
CY745
FILE:
PLAN
8660F1001C102
PROFILE
FILE: 8660F1001C102
(HORIZ)
0 2' 4' 8'
SCALE: 1" = 4'
0 20' 40' 80'
SCALE: 1" = 40'
(VERT)
KEY MAP
NORTH
2 Digitally signed by Brian W. Avon
Contact Info: Carollo Engineers, Inc.
Date: 2023.04.10 09:10:30-07'00'
624
628
632
636
640
644
648
652
656
660
624
628
632
636
640
644
648
652
656
660
C29+00 C30+00 C31+00 C32+00 C33+00 C34+00 C35+00 C36+00 C37+00 C38+00 C39+00 STA C29+96.23 INV=629.60 12" 22.5° BEND STA C30+10.59 INV=635.19 12" 22.5° BEND STA C32+16.94 INV=635.19 12" 22.5° BEND STA C33+25 INV=635.19 12" 90° BEND STA C33+25 INV=643.40 12" 90° BEND STA C34+30 INV=643.40 12" 90° BEND STA C34+30 INV=637.17 12" 90° BEND STA C35+34.79 INV=639.32 12" 11.25° BEND STA C38+50.21 INV=646.50 12" 11.25° BEND STA C29+35.18 INV=629.60 STA C34+71.65 INV=637.18 STA C35+74.21 INV=640.68 STA C36+62.55 INV=645.67 STA C37+14.75 INV=646.50 STA C29+75.00 BLOW OFF TYP
INSTALL 405 LF OF 12" PVC DR18 CY111
RESTRAINED JOINTS REQ'D
STA C31+75.00STA C35+80.00
RESTRAINED JOINTS REQ'D
STA C38+09.00
S=1.36% S=0.00% S=0.00%
S=-41.14%
S=0.00% S=0.00%
S=0.00%
S=-0.03%
S=-3.41%
S=-3.49%
S=-5.65%
S=-1.59%
S=0.00%
S=-19.86%
INSTALL 147 LF OF 12" DIP PC350 INSTALL 448 LF OF 12" PVC DR18 TYP
CY111
EXISTING GRADE
STA C33+05.00
PVC TO DI TRANSITION
STA C34+52.00
PVC TO DI TRANSITION STA C34+60.00
BLOW OFF
STA C29+55.64
INV=629.60
12" 22.5° BEND
RESTRAINED JOINTS REQ'D
STA C29+44.00STA C30+55.00
11+00
LIVE
OAK
AVE
N BUSH ST
LOW GAP RD
LOW GAP RD
C29+00
C30+00
C31+00
C32+00
C33+00
C34+00
C35+00
C36+00 C37+00 C38+00 C39+00
STA C32+16.94
N=2185714.69
E=6216324.27
12" 22.5° BEND
STA C35+34.79
N=2185714.69
E=6216006.42
12" 11.25° BEND 12" RW
STA C29+55.64
N=2185600.56
E=6216559.32
12" 22.5° BEND
Plot Date: 4/7/2023 6:13:17 AM
SCALE
KEY MAP
PROJECT NO. LAST SAVED BY: FILE NAME:
CDA
BH
BWA
99C14
44 CIVIL
PLAN AND PROFILE ALIGNMENT C
STA C29+00 TO STA C39+00
8660F1099C14.dwg JDiDonato 8660F10
REV DATE BY DESCRIPTION
DATE
CHECKED
DRAWN
DESIGNED
8660F.10
JOB NO.
DRAWING NO.
SHEET NO.
SCALES ACCORDINGLY
VERIFY SCALES
THIS SHEET, ADJUST
IF NOT ONE INCH ON
BAR IS ONE INCH ON
ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200
CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 76832
THIS SHEET
Know what's below.
Callbefore you dig.
MATCH LINE STA C29+00 SEE DWG 99C13
KEY NOTES:
1. HORIZONTAL BEND ACHIEVED BY ROTATING DUAL
90 DEGREE VERTICAL BENDS.
2. REFER TO SHEET 99S12 FOR BRIDGE, ABUTMENT,
AND PIPE CONNECTION DETAILS.
3. VERTICAL BEND TO BE ACHIEVED BY PULLED
PIPE. MAXIMUM ALLOWED DEFLECTION IS HALF
OF THE MANUFACTURER'S SPECIFIED
DEFLECTION. CONTRACTOR MAY DEFLECT MORE
THAN ONE JOINT TO ACHIEVE TOTAL
DEFLECTION.
#
GENERAL NOTES:
1. NOT USED.
BLOW
OFF TYP
CY733
BLOW
OFF TYP
CY733
FILE:
PLAN
8660F1001C102
PROFILE
FILE: 8660F1001C102
(HORIZ)
0 2' 4' 8'
SCALE: 1" = 4'
0 20' 40' 80'
SCALE: 1" = 40'
(VERT)
KEY MAP
NORTH
MATCH LINE STA C39+00 SEE DWG 99C15
2 3
3 3 3 3
Digitally signed by Brian W. Avon
Contact Info: Carollo Engineers, Inc.
Date: 2023.04.10 09:10:45-07'00'
648
652
656
660
664
668
672
676
680
684
648
652
656
660
664
668
672
676
680
684
C39+00 C40+00 C41+00 C42+00 C43+00 C44+00 C45+00 C46+00 C47+00 C48+00 C49+00 STA C39+63.47 INV=669.00 12" 11.25° BEND STA C39+77.40 INV=669.00 12" 45° BEND STA C40+14.21 INV=669.00 12" 45° BEND STA C40+56.63 INV=669.00 12" 11.25° BEND STA C40+86.72 INV=663.74 12" 22.5° BEND STA C41+52.61 INV=650.66 12" 11.25° BEND STA C41+58.52 INV=650.64 12" 11.25° BEND STA C43+18.76 INV=653.64 12" 11.25° BEND STA C40+00.00 CARV STA C45+23.97 INV=660.13 12" 11.25° BEND STA C45+33.66 INV=660.42 12" 11.25° BEND STA C45+75.21 INV=670.02 12" 11.25° BEND STA C45+84.50 INV=670.02 12" 11.25° BEND STA C46+68.39 INV=670.02 12" 90° BEND STA C48+81.67 INV=676.50 12" 90° BEND EX 6" SS INV=674.4± EX GAS INV=679.0± EX 8" SS INV=673.0± EX 6" UTIL INV=653.7± STA C39+90 12" GV STA C42+60.00 BLOW OFF STA C48+89.90 CARV TYP
INSTALL 1000 LF OF 12" PVC DR18 CY111
RESTRAINED JOINTS REQ'D
STA C41+65.00
STA C42+24.39
INV=650.67
EXISTING GRADE
S=-19.86%
S=0.00%
S=18.22%
S=19.98%
S=0.40%
S=-0.00%
S=-3.16%
S=-3.18%
S=-3.29%
S=-23.15%
S=0.16% S=0.00%
S=-3.50%
S=-2.76%
STA C47+55.92
INV=673.06
S=0.02%
RESTRAINED JOINTS REQ'D
STA C43+10.00STA C43+25.00
RESTRAINED JOINTS REQ'D
STA C45+15.00STA C47+25.00
RESTRAINED JOINTS REQ'D STA C48+25.00
M-408
STA C39+30.00
METER TAPM-409
STA C46+35.00
METER TAP
STA C39+77.40
N=2185817.96
E=6215576.02
12" 45° BEND
STA C40+14.21
N=2185798.71
E=6215544.63
12" 45° BEND
STA C40+86.72
N=2185728.21
E=6215527.72
12" 22.5° BEND
STA C41+58.52
N=2185657.29
E=6215538.96
12" 11.25° BEND
STA C43+18.76
N=2185497.17
E=6215532.69
12" 11.25° BEND
STA C45+23.97
N=2185297.62
E=6215484.84
12" 11.25° BEND
STA C45+84.50
N=2185237.14
E=6215482.48
12" 11.25° BEND
STA C46+68.39
N=2185156.13
E=6215460.98
12" 90° BEND
STA C48+81.67
N=2185086.95
E=6215662.74
12" 90° BEND
12" RW
C38+00
C39+00
C40+00
C41+00
C42+00
C43+00 C44+00
C45+00
C46+00
C47+00
C48+00
C49+00
11+00
LIVE
OAK
AVE
N BUSH ST
LOW GAP RD
LOW GAP RD
Plot Date: 4/7/2023 11:32:02 AM
SCALE
KEY MAP
PROJECT NO. LAST SAVED BY: FILE NAME:
CDA
BH
BWA
99C15
45 CIVIL
PLAN AND PROFILE ALIGNMENT C
STA C39+00 TO STA C49+00
8660F1099C15.dwg JDiDonato 8660F10
REV DATE BY DESCRIPTION
DATE
CHECKED
DRAWN
DESIGNED
8660F.10
JOB NO.
DRAWING NO.
SHEET NO.
SCALES ACCORDINGLY
VERIFY SCALES
THIS SHEET, ADJUST
IF NOT ONE INCH ON
BAR IS ONE INCH ON
ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200
CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 76832
Know what's below.
Callbefore you dig.
KEY NOTES:
1. VERTICAL BEND TO BE ACHIEVED BY PULLED
PIPE. MAXIMUM ALLOWED DEFLECTION IS HALF
OF THE MANUFACTURER'S SPECIFIED
DEFLECTION. CONTRACTOR MAY DEFLECT MORE
THAN ONE JOINT TO ACHIEVE TOTAL
DEFLECTION.
GENERAL NOTES:
1. CONTRACTOR TO VERIFY ALL UTILITY CROSSINGS
PRIOR TO CONSTRUCTION.
2. CONTRACTOR TO REPLACE ALL ROAD STRIPING
DAMAGED BY PIPELINE REPLACEMENT PER
SECTION 02762. CONTRACTOR SHALL REPLACE
ENTIRETY OF DAMAGED STRIPING.
#
THIS SHEET
M-408
METER
TAP
12" BFV
CARV
M-409
METER
TAP
CARV
MATCH LINE STA C39+00 SEE DWG 99C14 MATCH LINE STA C49+00 SEE DWG 99C16 FILE:
PLAN
8660F1001C102
PROFILE
FILE: 8660F1001C102
(HORIZ)
0 2' 4' 8'
SCALE: 1" = 4'
0 20' 40' 80'
SCALE: 1" = 40'
(VERT)
KEY MAP
NORTH
BLOW OFF
EX 6" UTILITY
1 1
TYP
CY901
TYP
CY715
TYP
CY745
TYP
CY901
TYP
CY745
TYP
CY733
Digitally signed by Brian W. Avon
Contact Info: Carollo Engineers, Inc.
Date: 2023.04.10 09:11:01-07'00'
NO PARKING
NO PARKING
NO
PARKING
NO PARKING
NO PARKING
NO PARKING
NO PARKING
NO PARKING
NO PARKING
EX 6" SS
EX G
EX 4" W
EX W
EX 6" SS
EX OHW
EX 8" W
EX 8" W
EX OHW
EX OHW
STA C49+07.21
N=2185062.99
E=6215653.93
12" x 8" RED
C49+00 C50+00 C51+00 C52+00 C53+00 C54+00 C55+00
C56+00
C57+00
C58+00
C59+00
8" RW
STA C56+15.54
N=2184414.14
E=6215379.19
8" 11.25° BEND
STA C56+31.12
N=2184399.91
E=6215372.84
8" 22.5° BEND
STA C57+34.49
N=2184296.57
E=6215370.04
8" x 6" RED
STA. 54+84.74
N=2184520.88
E=6215454.77
Δ=15°07'40"
LIVE OAK AVE
N BUSH ST
LOW GAP RD
LOW GAP RD
672
676
680
684
688
692
696
700
704
672
676
680
684
688
692
696
700
704
C49+00 C50+00 C51+00 C52+00 C53+00 C54+00 C55+00 C56+00 C57+00 C58+00 C59+00 EX GAS INV=679.0± EX W INV=686.3± EX 8" W INV=691.0± EX W LATERAL INV=693.4± STA C49+07.21 INV=676.67 12" x 8" RED STA C55+76.78 INV=688.35 8" 11.25° BEND STA C55+87.79 INV=690.36 8" 11.25° BEND STA C56+15.54 INV=690.82 8" 11.25° BEND STA C56+31.12 INV=690.98 8" 22.5° BEND STA C57+34.49 INV=692.42 8" x 6" RED STA C49+18.17 INV=676.67 STA C49+87.21 8" BFVSTA C53+33.90 INV=683.62 STA C54+84.74 INV=688.20 STA C57+14.50 8" GV
EXISTING GRADE
S=0.04% S=-1.67%
S=-1.67%
S=-3.04%
S=-0.16%
S=-19.92%
S=-1.09% S=-1.12% S=-0.99% S=-3.08%
S=-2.49%
TYP
CY111
INSTALL 7 LF OF 12" PVC DR18
INSTALL 827 LF OF 8" PVC DR18 TYP
CY111
INSTALL 162 LF OF 6" PVC DR18
TYP
CY111
RESTRAINED JOINTS REQ'D RESTRAINED JOINTS REQ'D STA C50+92.00 STA C55+93.00 STA C58+20.00
M-410
STA A57+00.00
METER TAPM-411
STA A57+30.00
METER TAP
Plot Date: 4/7/2023 11:32:39 AM
SCALE
KEY MAP
PROJECT NO. LAST SAVED BY: FILE NAME:
CDA
BH
BWA
99C16
46 CIVIL
PLAN AND PROFILE ALIGNMENT C
STA C49+00 TO STA C59+00
8660F1099C16.dwg JDiDonato 8660F10
REV DATE BY DESCRIPTION
DATE
CHECKED
DRAWN
DESIGNED
8660F.10
JOB NO.
DRAWING NO.
SHEET NO.
SCALES ACCORDINGLY
VERIFY SCALES
THIS SHEET, ADJUST
IF NOT ONE INCH ON
BAR IS ONE INCH ON
ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200
CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 76832
Know what's below.
Callbefore you dig.
8" BFV
TYP
CY715
KEY NOTES:
1. VERTICAL BEND TO BE ACHIEVED BY PULLED
PIPE. MAXIMUM ALLOWED DEFLECTION IS HALF
OF THE MANUFACTURER'S SPECIFIED
DEFLECTION. CONTRACTOR MAY DEFLECT MORE
THAN ONE JOINT TO ACHIEVE TOTAL
DEFLECTION.
2. VERTICAL BEND TO BE ACHIEVED BY ROTATING
HORIZONTAL BEND.
3. CONTRACTOR SHALL PROTECT EXISTING SSMH
DURING PIPELINE INSTALLATION. REPLACE IF
DAMAGED. ADJUST PIPELINE ALIGNMENT AS
REQUIRED.
4. CONTRACTOR SHALL REPLACE ANY CURB AND
GUTTER THAT IS DAMAGED AS A RESULT OF
PIPELINE INSTALLATION. REPLACE PER CITY OF
UKIAH STANDARD SPECIFICATIONS AND SECTION
02772.
GENERAL NOTES:
1. CONTRACTOR TO VERIFY ALL UTILITY CROSSING
PRIOR TO CONSTRUCTION.
2. THE CONTRACTOR SHALL ASSUME THAT ANY
VERTICAL BENDS SHOWN ARE ROTATED FROM
CORRESPONDING HORIZONTAL BENDS UNLESS
NOTED OTHERWISE.
3. CONTRACTOR TO REPLACE ALL ROAD STRIPING
DAMAGED BY PIPELINE REPLACEMENT PER
SECTION 02762. CONTRACTOR SHALL REPLACE
ENTIRETY OF DAMAGED STRIPING.
#
M-411
TYP
CY901
8" GV
TYP
CY716
M-410
TYP
CY901
LIVE OAK AVE
LIVE OAK AVE
CYPRESS AVE
CLUBHOUSE DR
THIS SHEET
4 1
FILE:
PLAN
8660F1001C102
PROFILE
FILE: 8660F1001C102
(HORIZ)
0 2' 4' 8'
SCALE: 1" = 4'
0 20' 40' 80'
SCALE: 1" = 40'
(VERT)
KEY MAP
NORTH
MATCH LINE STA C59+00 SEE DWG 99C17
MATCH LINE STA C49+00 SEE DWG 99C15
1 1
Digitally signed by Brian W. Avon
Contact Info: Carollo Engineers, Inc.
Date: 2023.04.10 09:11:15-07'00'
688
692
696
700
704
708
712
716
720
688
692
696
700
704
708
712
716
720
C59+00 C60+00 C61+00 C62+00 C63+00 C64+00 C65+00 C66+00 C67+00 C68+00 EX W (HYD) INV=700.4± EX E INV=701.8± EX W (HYD) INV=702.0± EX 6" SS INV=698.5± EX 6" W INV=700.9± EX 8" SS INV=703.0± S=-1.11%
S=-1.35%
S=-1.90% S=-1.43%
S=-1.94%
S=3.58%
S=0.00%
S=-2.57%
STA C60+22.31
INV=699.667
6" 45° BEND
STA C60+73.52
INV=700.230
6" 45° BEND
STA C61+07.35
INV=700.680
6" 11.25° BEND
STA C61+27.21
INV=701.050
6" 11.25° BEND
STA C61+76.36
INV=701.750
6" 11.25° BEND
STA C62+25.44
INV=702.690
6" 22.5° BEND
STA C63+81.67
INV=697.120
6" 90° BEND
STA C64+12.00
INV=697.12
INSTALL 1000 LF OF 6" PVC DR18
TYP
CY111
STA C62+20.00
CARV
STA C64+10.00
BLOW OFF
STA C60+10.00STA C60+34.00STA C60+61.00
STA C60+86.00
STA C61+01.00STA C61+14.00
STA C61+20.00STA C61+32.00
STA C61+70.00STA C61+82.00STA C62+18.00STA C62+30.00STA C63+50.00STA C64+11.00STA C67+34.00
NO PARKING
NO PARKING
NO
PARKING
NO PARKING
NO PARKING
NO PARKING
NO PARKING
NO PARKING
NO PARKING
NO PARKING
NO PARKING
NO PARKING
NO PARKING
NO PARKING
NO PARKING
NO PARKING
EX 6" SS
EX 8" W
EX OHW
EX 8" W
EX 6" SS
EX OHW
EX 6" SS
STA C60+22.31
N=2184008.86
E=6215362.25
6" 45° BEND
STA C60+73.52
N=2183971.68
E=6215397.47
6" 45° BEND
STA C61+07.35
N=2183937.90
E=6215395.64
6" 11.25° BEND
STA C61+27.21
N=2183918.24
E=6215398.46
6" 11.25° BEND
STA C61+76.36
N=2183871.88
E=6215414.78
6" 11.25° BEND
STA C62+25.44
N=2183829.66
E=6215439.80
6" 22.5° BEND
STA C63+81.67
N=2183744.05
E=6215570.49
6" 90° BEND
6" RWC59+00
6" RW
C60+00
C61+00
C62+00
C63+00
C64+00
C65+00
C66+00
EX OHW
EX 8" SS
EX 4" W
EX 6" SS
6" RW
C65+00 C66+00 C67+00 C68+00
LIVE OAK AVE
N BUSH ST
LOW GAP RD
LOW GAP RD
Plot Date: 4/7/2023 11:33:12 AM
SCALE
KEY MAP
PROJECT NO. LAST SAVED BY: FILE NAME:
CDA
BH
BWA
99C17
47 CIVIL
PLAN AND PROFILE ALIGNMENT C
STA C59+00 TO C68+00
8660F1099C17.dwg JDiDonato 8660F10
REV DATE BY DESCRIPTION
DATE
CHECKED
DRAWN
DESIGNED
8660F.10
JOB NO.
DRAWING NO.
SHEET NO.
SCALES ACCORDINGLY
VERIFY SCALES
THIS SHEET, ADJUST
IF NOT ONE INCH ON
BAR IS ONE INCH ON
ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200
CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 76832
Know what's below.
Callbefore you dig.
MATCH LINE STA C65+00 SEE LEFT
MATCH LINE STA C65+00 SEE RIGHT
MATCH LINE STA C59+00 SEE DWG 99C16
MATCH LINE STA C68+00 SEE DWG 99C18
BLOW OFF
TYP
CY733
CARV
TYP
CY745
THIS SHEET
FILE:
PLAN
8660F1001C102
PROFILE
FILE: 8660F1001C102
(HORIZ)
0 2' 4' 8'
SCALE: 1" = 4'
0 20' 40' 80'
SCALE: 1" = 40'
(VERT)
KEY MAP
NORTH
KEY NOTES:
1. VERTICAL BEND TO BE ACHIEVED BY PULLED
PIPE. MAXIMUM ALLOWED DEFLECTION IS HALF
OF THE MANUFACTURER'S SPECIFIED
DEFLECTION. CONTRACTOR MAY DEFLECT MORE
THAN ONE JOINT TO ACHIEVE TOTAL
DEFLECTION.
2. VERTICAL BEND TO BE ACHIEVED BY ROTATING
HORIZONTAL BEND.
3. CONTRACTOR TO SUPPORT UTILITY POLE AS
REQUIRED BY UTILITY POLE OWNER.
4. RESTRAINED JOINTS REQUIRED.
GENERAL NOTES:
1. CONTRACTOR TO VERIFY ALL UTILITY CROSSING
PRIOR TO CONSTRUCTION.
2. THE CONTRACTOR SHALL ASSUME THAT ANY
VERTICAL BENDS SHOWN ARE ROTATED FROM
CORRESPONDING HORIZONTAL BENDS UNLESS
NOTED OTHERWISE.
3. CONTRACTOR TO REPLACE ALL ROAD STRIPING
DAMAGED BY PIPELINE REPLACEMENT PER
SECTION 02762. CONTRACTOR SHALL REPLACE
ENTIRETY OF DAMAGED STRIPING.
3 1 1 1 1 1 1
#
4 4 4 4 4 4
1 4
4 Digitally signed by Brian W. Avon
Contact Info: Carollo Engineers, Inc.
Date: 2023.04.10 09:04:13-07'00'
696
700
704
708
712
716
720
724
728
696
700
704
708
712
716
720
724
728
C68+00 C69+00 C70+00 C71+00 C72+00 S=-2.56% S=-0.65%
S=-0.85%
STA C68+14.64
6" GV
STA C68+38.73
INV=707.98
6" 45° BEND
STA C68+40.15
INV=707.98
6" x 4" RED
STA C68+69.90
INV=708.17
4" 22.5° BEND
M-412
STA C68+68.00
METER TAPM-413
STA C70+40.00
METER TAP
STA C70+45.00
CARV
INSTALL 206 LF OF 4" PVC DR18
RESTRAINED JOINTS REQ'D
GRADE ASSUMED
STA C70+45.45
TYP
CY111
INSTALL 40 LF OF 6" PVC DR18
TYP
CY111
NO PARKING
NO PARKING
C68+00
C69+00
C70+00
C70+45.56
STA C68+69.90
N=2183351.19
E=6215295.37
4" 22.5° BEND
STA C68+38.73
N=2183358.01
E=6215325.78
6" 45° BEND
STA C68+40.15
N=2183357.70
E=6215324.40
6" x 4" RED
4" RW
6" RW
11+00 LIVE OAK AVE N BUSH ST
LOW GAP RD
LOW GAP RD
Plot Date: 4/7/2023 11:33:43 AM
SCALE
KEY MAP
PROJECT NO. LAST SAVED BY: FILE NAME:
CDA
BH
BWA
99C18
48 CIVIL
PLAN AND PROFILE ALIGNMENT C
STA C68+00 TO STA C70+45.56
8660F1099C18.dwg JDiDonato 8660F10
REV DATE BY DESCRIPTION
DATE
CHECKED
DRAWN
DESIGNED
8660F.10
JOB NO.
DRAWING NO.
SHEET NO.
SCALES ACCORDINGLY
VERIFY SCALES
THIS SHEET, ADJUST
IF NOT ONE INCH ON
BAR IS ONE INCH ON
ORIGINAL DRAWING 0 1"
APRIL 2023 OF 200
CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
123456789 10 11 12 13
ABCDEF
123456789 10 11 12 13
ABCDEFG
G
®
No. 76832
Know what's below.
Callbefore you dig.
MATCH LINE STA C68+00 SEE DWG 99C17
M-413
METER
TAP
CARV
M-412
METER
TAP
THIS SHEET
FILE:
PLAN
8660F1001C102
PROFILE
FILE: 8660F1001C102
(HORIZ)
0 2' 4' 8'
SCALE: 1" = 4'
0 20' 40' 80'
SCALE: 1" = 40'
(VERT)
KEY MAP
NORTH
4" RESTRAINED CAP
6" GV
TYP
CY716
KEY NOTES:
1. VERTICAL BEND TO BE ACHIEVED BY PULLED
PIPE. MAXIMUM ALLOWED DEFLECTION IS HALF
OF THE MANUFACTURER'S SPECIFIED
DEFLECTION. CONTRACTOR MAY DEFLECT MORE
THAN ONE JOINT TO ACHIEVE TOTAL
DEFLECTION.
2. VERTICAL BEND TO BE ACHIEVED BY ROTATING
HORIZONTAL BEND.
GENERAL NOTES:
1. CONTRACTOR TO VERIFY ALL UTILITY CROSSING
PRIOR TO CONSTRUCTION.
2. THE CONTRACTOR SHALL ASSUME THAT ANY
VERTICAL BENDS SHOWN ARE ROTATED FROM
CORRESPONDING HORIZONTAL BENDS UNLESS
NOTED OTHERWISE.
3. CONTRACTOR TO REPLACE ALL ROAD STRIPING
DAMAGED BY PIPELINE REPLACEMENT PER
SECTION 02762. CONTRACTOR SHALL REPLACE
ENTIRETY OF DAMAGED STRIPING.
#
TYP
CY901
TYP
CY901
TYP
CY745
111
Digitally signed by Brian W. Avon
Contact Info: Carollo Engineers, Inc.
Date: 2023.04.10 09:03:46-07'00'
602
601
600
601
600
600
602
600
599
601
602
598
599
600
EX-21" SS
21" SS
21" SS
21" SS
16" RW
4" RW
16" OVERFLOW
EX-16" RW
600 599 598 597 596
601
602
595
602
602
Plot Date: 4/7/2023 11:51:50 AM
REV DATE BY DESCRIPTION
DATE
CHECKED
DRAWN
DESIGNED
8660F.10
JOB NO.
DRAWING NO.
SHEET NO.
SCALES ACCORDINGLY
VERIFY SCALES
THIS SHEET, ADJUST
IF NOT ONE INCH ON
BAR IS ONE INCH ON
ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200
CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
PROJECT NO. LAST SAVED BY: FILE NAME:
CDA
BH
BWA
99C19
49 CIVIL
PUMP STATION AND
STORAGE SITE PLAN
8660F1099C19.dwg JDiDonato 8660F10
FILE:
PLAN
8660F1001C102
0 15' 30' 60'
SCALE: 1" = 30'
Know what's below.
Callbefore you dig.
RECYCLED WATER
STORAGE TANK
ACCESS ROAD
NEW BLADDER TYPE
SURGE VESSEL
EXISTING PIPE TO BE
DECOMMISSIONED
(ABANDONED/REMOVED)
MAINTAIN EXISTING
SLUDGE POND
NEW
RECONSTRUCTED
POND
TOE OF SLOPE
TOP OF SLOPE
EX 24" DIP TRANSFER PIPE
FROM BOOSTER PS
C
99S02
ELECTRICAL
BUILDING
A
99M01
RECYCLED WATER
PUMP STATION
TYP
CY131
3 5
4 D
99M03
TYP
CY131
3 2
EX 24" SDR 35
PVC OVERFLOW
EX 18" CLCS PW
DISTRIBUTION PIPE
EX 1 1/2"
PVC NPW
EX 6"
PVC SS
EX TREATMENT BLDG
EX 16" RW
FROM WWTP
EX TRANSFORMER
EX 6"
PVC SS
TANK FILL VALVE
F
99S06
ELECTRICAL DUCT BANK
ELECTRICAL DUCT BANK
6 C
99C21
OLD CASTLE PRECAST HEADWALL (TYP),
OR EQUAL, OR CAST IN PLACE WITH
ACCORDANCE WITH CALTRANS
STANDARD PLAN D86B
INV: 595.00
KEY NOTES:
1. MAINTAIN USE OF EXISTING POND. DAMAGE TO
EXISTING BANK MUST BE PROTECTED OR
REPAIRED.
2. CONSTRUCT NEW ACCESS ROAD. TIE INTO
EXISTING PAVING.
3. NEW CONNECTION TO PHASES 1-3 PIPELINE. 16"
PVC 90-DEGREE BEND. PROVIDE THRUST BLOCK
PER CY131/TYP.
4. EXISTING PIPE TO BE DEWATERED, CAPPED, AND
ABANDONED IN PLACE.
5. REROUTE 360 LF OF 21" SANITARY SEWER. SEE
DWG 99C22.
6. PROTECT 24" DIP IN PLACE DURING POND
RECONSTRUCTION. REPLACE IN PLACE SEGMENT
OF PIPE DAYLIGHTED DUE TO POND EXCAVATION
AND CONSTRUCTION.
GENERAL NOTES:
1. SEE ELECTRICAL DRAWINGS FOR ELECTRICAL
ROUTING AND DETAILS.
#
5 Digitally signed by Reace P. Fisher
Contact Info: Carollo Engineers, Inc.
Date: 2023.04.07 15:05:05-07'00'
600
599
598 597
596
601
602
595
602
602
3:1
3:1
3:1
3:1
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
C1
C2
C3
C4
C5
C6
C7
5' MIN TANK FLOWLINE
100'
COORDINATE CONTROL POINTS
POINT 123456789
10 11
12 13
14 15
16 17
18 19
20 21
22 23
24 NORTHING
2186432.31
2186412.37
2186404.57
2186398.81
2186375.82
2186338.26
2186377.89
2186376.76
2186427.13
2186439.15
2186462.03
2186466.02
2186470.77
2186447.73
2186443.74
2186420.69
2186425.31
2186461.67
2186470.13
2186492.11
2186558.26
2186587.34
2186596.62
2186569.87
EASTING
6223035.61
6223037.12
6222933.98
6222919.81
6222892.36
6222847.51
6222804.48
6222789.53
6222768.18
6222781.31
6222765.54
6222765.23
6222828.07
6222854.89
6222855.19
6222882.00
6222929.76
6222962.09
6222806.37
6222781.66
6222778.90
6222804.76
6222927.48
6222957.57
ELEVATION
598.40
597.60
601.20
601.30
601.70
0.00 602.00
602.00
601.95
601.75
601.65
601.60
601.20
601.20
601.20
601.20
601.00
601.00
601.00
601.00
601.00
601.00
601.00
601.00
DESCRIPTION
PI ROAD
PI ROAD
PC C1
PT C1
PI ASPHALT
CENTER OF TANK
PI ASPHALT
PUMP STA SE CORNER
PUMP STA NW CORNER
ELEC BLDG SE CORNER
ELEC BLDG NW CORNER
PI ASPHALT
PC C2
PT C2
PC C3
PT C3
PC C4
PT C4
PC C5
PT C5
PC C6
PT C6
PC C7
PT C7
CURVE TABLE
NO. XX
C1
C2
C3
C4
C5
C6
C7
LENGTH
15.54'
39.27'
39.27'
53.80'
36.91'
43.04'
44.93'
RADIUS
25.00'
25.00'
25.00'
35.00'
23.00'
28.00'
28.00'
DELTA
35°37'06"
90°00'00"
90°00'00"
88°03'54"
91°56'06"
88°03'54"
91°56'06"
TANGENT
8.03'
25.00'
25.00'
33.84'
23.79'
27.07'
28.96'
Plot Date: 4/7/2023 11:52:20 AM
REV DATE BY DESCRIPTION
DATE
CHECKED
DRAWN
DESIGNED
8660F.10
JOB NO.
DRAWING NO.
SHEET NO.
SCALES ACCORDINGLY
VERIFY SCALES
THIS SHEET, ADJUST
IF NOT ONE INCH ON
BAR IS ONE INCH ON
ORIGINAL DRAWING 0 1"
APRIL 2023 OF 200
CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
123456789 10 11 12 13
ABCDEF
123456789 10 11 12 13
ABCDEFG
G
®
PROJECT NO. LAST SAVED BY: FILE NAME:
CDA
BH
BWA
99C20
50 CIVIL
GRADING AND DRAINAGE
PLAN
8660F1099C20.dwg JDiDonato 8660F10
FILE:
PLAN
8660F1001C102
0 15' 30' 60'
SCALE: 1" = 30'
Know what's below.
Callbefore you dig.
RECYCLED WATER
STORAGE TANK
NEW BLADDER TYPE
SURGE VESSEL
NEW
RECONSTRUCTED
POND TOE OF SLOPE
TOP OF SLOPE
C
99S02
ELECTRICAL
BUILDING
A
99M01
RECYCLED WATER
PUMP STATION 5
D
99M03
2 KEY NOTES:
1. MATCH EXISTING GRADE WHERE INDICATED.
2. GRADE MIN 4% AWAY FROM TANK IN ALL
DIRECTIONS.
3. REMOVABLE GUARD POST PER CF161/TYP.
4. ALL UNPAVED AREAS WITHIN THE PROJECT SITE
SHALL BE COMPACTED AND RESEEDED PER
SPECIFICATIONS UNLESS NOTED OTHERWISE.
5. GRAVEL ACCESS ROAD SHALL BE 0'=6" AB OVER
GEOTEXTILE FABRIC WITH 1'=0" SUBGRADE AT
95% RC UNLESS OTHERWISE NOTED.
6. CONDUIT TRENCH PATCH TO MATCH EXISTING
GRADE.
7. REFER TO DWG 99C22 FOR SSMH LOCATIONS.
GENERAL NOTES:
1. SEE ELECTRICAL DRAWINGS FOR ELECTRICAL
ROUTING AND DETAILS.
#
EX TREATMENT BLDG
EX TRANSFORMER
TANK FILL VALVE
F
99S06
SSMH
SSMH
ELEC HH
ELEC HH
ELEC HH
EX FENCE TO
REMAIN
1 B
99C21
FG 601.25
FL 601.49
FG 601.25
A
99C21
FL 602.90
FG 603.39
FG 602.40
FL 602.20
S=1.00%
S=1.00%
S=0.95% S=1.00%
S=1.00%
FL 602.20
FG 602.40 S=1.00%
S=1.00%
FL 601.60
FG 601.22
FL 601.84
±
±±
-
4 1
4 4
5 5
5 3 TYP OF 4
3 TYP OF 7
TYP OF 4
3 1
1 6
6 6
6 FL 603.19
7 7 SSMH
7 Digitally signed by Reace P. Fisher
Contact Info: Carollo Engineers, Inc.
Date: 2023.04.07 15:06:37-07'00'
1 10'-0" 10'-0"
1" LIP
2.5 % SLOPE
3 2
CL
FL SWALE
5'-0"
4 % MIN
FF TANK
Plot Date: 4/7/2023 11:53:01 AM
GENERAL NOTES:
1. REFER TO SPECIFICATIONS AND GEOTEXTILE
REPORT FOR SUBGRADE PREPARATION
REQUIREMENTS.
SCALE
REV DATE BY DESCRIPTION
DATE
CHECKED
DRAWN
DESIGNED
8660F.10
JOB NO.
DRAWING NO.
SHEET NO.
SCALES ACCORDINGLY
VERIFY SCALES
THIS SHEET, ADJUST
IF NOT ONE INCH ON
BAR IS ONE INCH ON
ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200
CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
PROJECT NO. LAST SAVED BY: FILE NAME:
CDA
JRD
BWA
99C21
51 CIVIL
SECTIONS
8660F1099C21.dwg JDiDonato 8660F10
SCALE:
FILE:
A
99C20
SECTION
1/2" = 1'-0"
8660F1001C107
SCALE:
FILE:
B
99C20
SECTION
1/2" = 1'-0"
8660F1001C107
0 1' 2' 4'
SCALE:
1 2" = 1'-0"
SCALE:
FILE:
C
99C19
SECTION - TYPICAL POND BERM
NO SCALE
8660F1001C107
SCARIFY AND RECOMPACT
TO 90%
BASIN LINING RIVER ROCK
(6" MIN) OVER GEOTEXTILE
FABRIC PER SECTION 02620
EXCAVATION NEAT LINE
BASIN SIDE SLOPE
3H:1V (TYP)
FG: 595.00
3 TOP OF BERM
(MATCH EXISTING GRADE)
3 KEY NOTES:
1. GRAVEL ACCESS ROAD SHALL BE 0'-6" AB OVER
GEOTEXTILE FABRIC WITH 1'-0" SUBGRADE AT
95% RC UNLESS OTHERWISE NOTED.
2. ALL UNPAVED AREAS WITHIN THE PROJECT SITE
SHALL BE COMPACTED AND RESEEDED PER
SPECIFICATIONS UNLESS OTHERWISE NOTED.
3. REFER TO DWG 99C20 FOR FINAL GRADING
ELEVATIONS.
X
Digitally signed by Reace P. Fisher
Contact Info: Carollo Engineers, Inc.
Date: 2023.04.07 15:08:37-07'00'
9+00 10+00
11+00
12+00
13+00
14+00 EX 21" SS
EX 21" SS
21" SS 21" SS
STA. 10+00.00
60" MH01
N=2186294.83
E=6222714.84
STA. 10+59.59
60" MH02
N=2186246.87
E=6222750.22
STA. 13+68.52
60" MH03
N=2186295.44
E=6223055.30
16" RW
576
580
584
588
592
596
600
604
576
580
584
588
592
596
600
604
9+00 10+00 11+00 12+00 13+00 14+00 60" MH01 STA. 10+00 RIM=599.18 INV IN=588.84 (21" SE) INV IN=588.94 (21" W) 60" MH02 STA. 10+59.59 RIM=599.16 INV IN=588.68 (21" NW) INV OUT=588.54 (21" E) 60" MH03 STA. 13+68.52 RIM=597.92 INV IN=587.30 (21" W) INV OUT=587.30 (21" E) EX 21" SS
EX 21" SS
21" SS
21" SS
S=0.27%
S=0.40%
Plot Date: 4/7/2023 10:13:35 AM
SCALE
REV DATE BY DESCRIPTION
DATE
CHECKED
DRAWN
DESIGNED
8660F.10
JOB NO.
DRAWING NO.
SHEET NO.
SCALES ACCORDINGLY
VERIFY SCALES
THIS SHEET, ADJUST
IF NOT ONE INCH ON
BAR IS ONE INCH ON
ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200
CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 76832
Know what's below.
Callbefore you dig.
PROJECT NO. LAST SAVED BY: FILE NAME:
CDA
JDM
BWA
99C22
52 CIVIL
SEWER REALIGNMENT
8660F1099C22.dwg atucker 8660F10
FILE:
PLAN
8660F1001C102
PROFILE
FILE: 8660F1001C102
(HORIZ)
0 2' 4' 8'
SCALE: 1" = 4'
0 10' 20' 40'
SCALE: 1" = 20'
(VERT)
TYP
CS110
EXISTING GRADE
TYP
CS110
TYP
CS110
3 FUTURE
RECYCLED WATER
STORAGE TANK
2 1
1 1
KEY NOTES:
1. CONTRACTOR TO VERIFY THE INVERTS OF ALL
REPLACEMENT MANHOLES PRIOR TO
REPLACEMENT
2. STORAGE TANK, YARD PIPING, AND ELECTRICAL
DUCT BANK SHOWN FOR REFERENCE ONLY.
REFER TO SPECIFIC DRAWINGS FOR
CONSTRUCTION DETAILS. INSTALLATION OF THE
STORAGE TANK, YARD PIPING, AND ELECTRICAL
DUCT BANKS SHALL OCCUR AFTER THE
REPLACEMENT SEWER HAS BEEN CONSTRUCTED
3. SEGMENT OF EXISTING 21-INCH SEWER TO BE
REMOVED.
4. SEGMENT OF EXISTING 16-INCH RECYCLED
WATER PIPELINE TO BE DECOMMISSIONED
GENERAL NOTES:
1. CONTRACTOR TO VERIFY THE HORIZONTAL AND
VERTICAL LOCATIONS OF ALL EXISTING UTILITIES
PRIOR TO THE START OF CONSTRUCTION AND
NOTIFY THE ENGINEER OF ANY DISCREPANCIES
OR CONFLICTS.
2. EXISTING SEWER SEGMENT TO BE REMOVED AND
REPLACED AS SHOWN IN THE NEW SEWER
ALIGNMENT PRIOR TO THE CONSTRUCTION OF
STORAGE TANK.
3. CONTRACTOR TO BYPASS SEWER FLOWS DURING
REPLACEMENT OF SEWER.
X
367 LF 21-INCH SDR 21 PVC SS
TYP
CY111
Digitally signed by Brian W. Avon
Contact Info: Carollo Engineers, Inc.
Date: 2023.04.10 09:02:27-07'00'
Plot Date: 4/6/2023 8:53:07 AM PROJECT NO. LAST SAVED BY: FILE NAME:
MH
RGU
MCK
ARCHITECTURAL 99A01
ELECTRICAL BUILDING
CODE ANALYSIS, SCHEDULES, AND EGRESS PLAN
8660F1099A01.dwg vpetersvargas 8660F10
REV DATE BY DESCRIPTION
DATE
CHECKED
DRAWN
DESIGNED
8660F.10
JOB NO.
DRAWING NO.
SHEET NO.
SCALES ACCORDINGLY
VERIFY SCALES
THIS SHEET, ADJUST
IF NOT ONE INCH ON
BAR IS ONE INCH ON
ORIGINAL DRAWING
0 1"
APRIL 2023 OF 199
CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 84405
ROOM
NO. ROOM NAME OCCUPANCY ACCESSIBILITY BASIC
ALLOWABLE
AREA
ALLOWABLE
FLOOR AREA
PER OCCUP
ACTUAL
SQ FT
SPRINKLERED
EXITS
REQUIRED/
PROVIDED
OCCUPANCY
SEPARATION
BASIC ALLOW
STORIES/HEIGHT
OCCUPANCY
LOAD
CONSTRUCTION
TYPE
2022 CALIFORNIA BUILDING CODE
101 F-1 II-B 2 STORIES/55 FT 15,500 300 1 2/2 NR NR NR* - BUILDING ACTUAL F-1 II-B 2 STORIES/55 FT 15,500
ELECTRICAL ROOM 264
264
ELECTRICAL BUILDING
COMMENTS
NO.
DOOR
WIDTH THICK HEIGHT
DOOR
MAT'L FINISH WIDTH HEIGHT DEPTH TYPE
FRAME
MAT'L FINISH HEAD JAMB
DETAILS
SILL READER
CARD
LABEL
UL
TYPE
DOOR AND HARDWARE SCHEDULE
REMARKS
HW
GROUP
MAT'L MATERIAL
HW HARDWARE GROUP, REFERENCE SPECIFICATION SECTION 08710
NR NOT REQUIRED
R REQUIRED
UL UNDERWRITERS LABORATORIES FIRE RATING
ELECTRICAL BUILDING
101-1 7'-2" 1 3/4" V HM COATING
COATING
6'-8"
3'-4"
7'-4"
7'-4"
8"
8"
R
R
HM
HM
COATING
COATING
C
C
C
C
E
E
NR
NR
NR
NR
HW-1
HW-2
-
-
PR (3'-0'')
101-2 3'-0" 7'-2" 1 3/4" V HM
ROOM
NO. ROOM NAME
MAT'L
FLOOR
FINISH MAT'L
BASE
MAT'L FINISH
NORTH WALL
MAT'L HEIGHT
CEILING
MAT'L FINISH FINISH
SOUTH WALL
MAT'L FINISH MAT'L FINISH
EAST WALL WEST WALL
ROOM FINISH SCHEDULE
ELECTRICAL BUILDING
101 ELECTRICAL ROOM CONC SEALER CMU CMU PAINTING CMU PAINTING CMU PAINTING CMU PAINTING MTLDK ±18'-0" EXPO
EGRESS ABBREVIATION AND SYMBOL LIST
# #
##
SF: SQUARE FEET
OL: OCCUPANT LOAD
OLF: OCCUPANT LOAD FACTOR
SPR: AUTOMATIC SPRINKLER
NA: NOT APPLICABLE
DIRECTION OF EGRESS PATH
LENGTH OF EGRESS IN FEET
EXIT SIGN
FIRE EXTINGUISHER
FILE:
SCALE:
ELECTRICAL BUILDING - EGRESS PLAN A 1/4" = 1'-0"
8660F10S100
101
ELECTRICAL
ROOM
SF - 264
OL - 1
OLF - 300
SPR - NR
ENVELOPE COMPONENT U-VALUE REQUIRED U-VALUE PROVIDED
2022 CALIFORNIA ENERGY CODE
BUILDING ENVELOPE REQUIREMENTS - MENDOCINO COUNTY, CLIMATE ZONE 2
DOORS - SWINGING
DOORS - NONSWINGING
WALLS ABOVE GRADE, MASS
FLOORS, MASS
ROOFS - ABOVE ROOF DECK
U - 1.45
U - 0.70
CODE ANALYSIS ABBREVIATION LIST:
F-1 FACTORY INDUSTRIAL GROUP, MODERATE HAZARD OCCUPANCY (2022, CBC)
NR NOT REQUIRED
R REQUIRED
R-VALUE THERMAL RESISTANCE, IS THE INVERSE OF THE
TIME RATE OF HEAT FLOW THROUGH A BODY FROM ONE OF
ITS BOUNDING SURFACES TO THE OTHER SURFACE FOR A UNIT
TEMPERATURE DIFFERENCE BETWEEN THE TWO SURFACES,
UNDER STEADY STATE CONDITIONS, PER UNIT AREA
(2022, CBC)
SQ FT SQUARE FEET
U-FACTOR THERMAL TRANSMITTANCE, IS THE
COEFFICIENT OF HEAT TRANSMISSION (AIR TO AIR)
THROUGH A BUILDING COMPONENT OR ASSEMBLY, EQUAL
TO THE TIME RATE OF HEAT FLOW PER UNIT AREA AND UNIT
TEMPERATURE DIFFERENCE BETWEEN THE WARM SIDE AND
COLD SIDE AIR FILMS
(2022, CBC)
11' -2'' 13' -0''
FXE
U - 0.034 R-25
U - 0.039
U - 0.170 *
*
*
*
*
FXE
IN ACCORDANCE WITH SECTION 100.0(e)2.C OF THE 2022 CALIFORNIA ENERGY CODE, PROCESS SPACES. REFERENCE TITLE 24 DOCUMENTS FOR COMPLIANCE. *
IN ACCORDANCE WITH SECTION 11B-203.5 OF THE 2022 CALIFORNIA BUILDING
CODE, ELECTRICAL ROOMS ARE EXEMPT FROM ACCESSIBILITY REQUIREMENTS TYP
AJ103
TYP
AJ100
TYP
AJ105
TYP
AJ107
TYP
AJ109
Digitally signed by Matthew C. Kallevant
Contact Info: Carollo Engineers, Inc.
Date: 2023.04.07 16:56:39-04'00'
5263 OF 200
Plot Date: 4/7/2023 9:59:06 AM PROJECT NO. LAST SAVED BY: FILE NAME:
MH
RGU
JKN
99A02
54 ARCHITECTURAL
ELECTRICAL BUILDING
ELEVATIONS
8660F1099A02.dwg vpetersvargas 8660F10
REV DATE BY DESCRIPTION
DATE
CHECKED
DRAWN
DESIGNED
8660F.10
JOB NO.
DRAWING NO.
SHEET NO.
SCALES ACCORDINGLY
VERIFY SCALES
THIS SHEET, ADJUST
IF NOT ONE INCH ON
BAR IS ONE INCH ON
ORIGINAL DRAWING 0 1"
APRIL 2023 OF 200
CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
123456789 10 11 12 13
ABCDEF
123456789 10 11 12 13
ABCDEFG
G
®
No. 84405
1 18'-0"
TOP OF MASONRY
EL REFERENCE
STRUCTURAL
TOP OF
FINISH FLOOR
EL REFERENCE
STRUCTURAL
18'-0"
TOP OF MASONRY
EL REFERENCE
STRUCTURAL
TOP OF
FINISH FLOOR
EL REFERENCE
STRUCTURAL
18'-0"
TOP OF MASONRY
EL REFERENCE
STRUCTURAL
TOP OF
FINISH FLOOR
EL REFERENCE
STRUCTURAL
18'-0"
TOP OF MASONRY
EL REFERENCE
STRUCTURAL
TOP OF
FINISH FLOOR
EL REFERENCE
STRUCTURAL
7'-4"
24 SCALE:
FILE:
ELEVATION
E 1/4" = 1'-0"
8660F1001A201
NORTH
SCALE:
FILE:
ELEVATION
F 1/4" = 1'-0"
8660F1001A201
SOUTH
SCALE:
FILE:
ELEVATION
G 1/4" = 1'-0"
8660F1001A201
EAST
SCALE:
FILE:
ELEVATION
H 1/4" = 1'-0"
8660F1001A201
WEST
GENERAL NOTES:
1. FOR GENERAL STRUCTURAL NOTES, REFER TO
DRAWING 00S01.
2. FOR DOOR SCHEDULES, REFER TO DRAWING
98A01.
3. EXTERIOR CONCRETE MASONRY UNITS TO BE
FINISHED WITH WATER REPELLANT.
TYP
AC310 W/ CAGE
TYP
AG225
TYP
AG222
TYP
AG220
TYP
AG225
TYP
AG227
3 TYP
AG220
3 TYP
AC310 W/ CAGE
TYP
AC310 W/ CAGE
TYP
AG220
3 TYP
AG220
3 1
1 1
7'-4"
24 1. 12''x8"x16'' STANDARD CONCRETE MASONRY
UNIT. REFER TO SPECIFICATION SECTION
04220.
2. HOLLOW METAL DOOR AND FRAME. SPEC
SECTION 08110.
3. ALUMINUM COPING OVER PARAPET IN
ACCORDANCE WITH SPECIFICATION SECTION
07700.
4. EXTERNAL LIGHT FIXTURE REFERENCE
ELECTRICAL DRAWINGS.
# KEY NOTES:
Digitally signed by Matthew C. Kallevant
Contact Info: Carollo Engineers, Inc.
Date: 2023.04.07 16:56:45-04'00'
REV DATE BY DESCRIPTION
DATE
CHECKED
DRAWN
DESIGNED
8660F.10
JOB NO.
DRAWING NO.
SHEET NO.
SCALES ACCORDINGLY
VERIFY SCALES
THIS SHEET, ADJUST
IF NOT ONE INCH ON
BAR IS ONE INCH ON
ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200
CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 86094
JKN
AL
KP
00S01
55 STRUCTURAL
GENERAL STRUCTURAL NOTES
8660F100S01.dw
g
kjackson 8660F10
P
lotD
ate:12/14/2022
8:36:08
AM
UnitsDiscipline
P
lotD
ate: 07-APR
-2023 11:42:01
AM
U
ser:svcPW
Model:
Layout1 C
olorTable:gshade.ctb
D
esignS
cript:
C
arollo_S
td_P
en_v0905.pen
P
lotScale:1:1
GENERAL NOTES: GEOTECHNICAL REPORT / FOUNDATION DESIGN CRITERIA:
TYPICAL STRUCTURAL MATERIALS:
CONSTRUCTION: STRUCTURAL SYMBOLS:
CURED TO THEIR MINIMUM SPECIFIED 28-DAY COMPRESSIVE STRENGTH.
OF THE WALL ARE IN PLACE, ARE COMPLETE, AND (IN THE CASE OF CONCRETE) HAVE
2.DO NOT PLACE BACKFILL AGAINST WALLS UNTIL STRUCTURES SUPPORTING THE TOP PREPARED, BEFORE PROCEEDING WITH FOUNDATION CONSTRUCTION.
OBTAIN ENGINEER’S OBSERVATION OF SUBGRADE SURFACES, AS EXPOSED AND AS
1. EXPOSE AND PREPARE SUBGRADE AS SHOWN ON THE DRAWINGS AND SPECIFIED.
EXCAVATION AND BACKFILLING:
REINFORCING STEEL (FOR CONCRETE AND MASONRY):
CONCRETE:
STRUCTURAL STEEL:
STAINLESS STEEL:
B. TYPE 304L: E304L-15 ELECTRODES.
A. TYPE 316L: E316L-15 ELECTRODES.
4. WELDED CONNECTIONS:
C. TYPE 304/304L: ASTM F 593, GRADE B8, CLASS 1, HEAVY HEX.
B. TYPE 316/316L: ASTM F 593, GRADE B8M, CLASS 1, HEAVY HEX.
A. MATCH ALLOY OF THE STRUCTURAL MEMBERS CONNECTED.
3. BOLTED CONNECTIONS - BOLTS AND ANCHOR BOLTS:
2. SECTIONS: SHAPES AND BARS: ASTM A 276.
1. ANSI TYPE 316/316L EXCEPT WHERE TYPE 304/304L IS INDICATED ON THE DRAWINGS.
STRUCTURAL ALUMINUM:
ALLOY 4043 ELECTRODES.
A. GAS METAL ARC (MIG) OR GAS TUNGSTEN ARC (TIG) PROCESS USING FILLER
3. WELDED CONNECTIONS:
A. STAINLESS STEEL - TYPE 316, ASTM F 593, GRADE B8M, CLASS 1, HEAVY HEX.
2. BOLTED CONNECTIONS - BOLTS AND ANCHOR BOLTS:
B. SHEET AND PLATE: ASTM B 209, ALLOY 6061-T6.
A. SHAPES: ASTM B 308, ALLOY 6061-T6.
1. SECTIONS
STRUCTURAL ABBREVIATIONS:
DEFERRED DESIGN SUBMITTALS
BRACING, AND BALANCING.
THEIR DESIGN STRENGTH, PROTECT STRUCTURES AS REQUIRED BY SHORING, FACILITIES. UNTIL CONSTRUCTION IS COMPLETE AND MEMBERS HAVE ACHIEVED A. STRUCTURES HAVE BEEN DESIGNED FOR OPERATING LOADS ON COMPLETED
8. CONSTRUCTION LOADS:
STRUCTURAL DESIGN CRITERIA - GENERAL:
A. EARTHQUAKE DESIGN DATA FOR EACH STRUCTURE AS PER SPECIFICATIONS 01850.
7.EARTHQUAKE DESIGN DATA:
C. BASIC WIND SPEED (3 SEC GUST, 33 FEET ABOVE GROUND): 110 MPH.
B. WIND-BORNE DEBRIS REGION: NO
A. SPECIAL WIND REGION: NO
6.WIND DESIGN DATA:
5.FLUID PRESSURE LOADS: 63 PSF/FT (UNO).
E. CONCENTRATED AND IMPACT LOADS: SEE PLANS.
D. EQUIPMENT LOADS: SEE PLANS.
C. ROOF LIVE LOAD: SEE PLANS (20 PSF MINIMUM).
B. GRATING AND CHECKERED PLATE: 100 PSF (UNO).
A. FLOOR LIVE LOAD: SEE PLANS.
4.LIVE LOADS: (REDUCTIONS NOT USED)
3.DEAD LOADS: CALCULATED FOR STRUCTURE SELF-WEIGHT.
2.STRUCTURE RISK CATEGORY: III EXCEPT FOR TANK, RISK CATEGORY IV B. LOCAL AMENDMENTS: UKIAH CITY CODE.
A. 2022 CALIFORNIA BUILDING CODE (“CBC 2022”) WITH ASCE 7-16.
1. BUILDING CODE:
THESE OVERALL CRITERIA FOR THE SITE.
SEE DRAWINGS OF INDIVIDUAL STRUCTURES FOR SPECIFIC DESIGN CRITERIA BASED ON
2. WELDED WIRE FABRIC: ASTM A 1064.
C. ASTM A615 GRADE 80 SPIRALS FOR PILES AS INDICATED ON DRAWINGS.
B. WHERE INDICATED ON THE DRAWINGS: ASTM A 706.
A. TYPICAL: ASTM A 615, GRADE 60.
1. DEFORMED BARS:
THE DRAWINGS.
CONFORM TO THE FOLLOWING REQUIREMENTS UNLESS OTHERWISE INDICATED ON ITS MINIMUM SPECIFIED 28-DAY COMPRESSIVE STRENGTH.
STRUCTURE ABOVE IS COMPLETE AND (IN THE CASE OF CONCRETE) HAS CURED TO ARE COMPLETE, PROVIDE BRACING FOR WALLS. KEEP BRACING IN PLACE UNTIL THE
3. WHERE BACKFILL MUST BE PLACED AGAINST WALLS BEFORE STRUCTURES ABOVE FOR DETAILED AND LOCATION-SPECIFIC REQUIREMENTS.
2. SEE PROJECT SPECIFICATIONS AND NOTES ON DRAWINGS OF SPECIFIC STRUCTURES OTHERWISE INDICATED ON THE DRAWINGS.
1. MATERIALS SHALL CONFORM TO THE FOLLOWING REQUIREMENTS UNLESS 2) WELDING.
1) BOLTING.
C.STRUCTURAL ALUMINUM.
2) WELDING.
1) HIGH-STRENGTH BOLTING.
B.STRUCTURAL STEEL (CARBON AND STAINLESS).
4) ANCHORS - POST-INSTALLED MECHANICAL AND ADHESIVE.
3) ANCHORS - CAST-IN AND BUILT-IN ANCHOR BOLTS.
2) MEMBER SIZES/TYPES.
1) MEMBER LOCATIONS.
A.GENERAL ALL METALS:
5.DIVISION 5 METALS
G.PROTECTION AND CURING PROCEDURES.
F.GROUT AND GROUTING.
E.MORTAR AND JOINTS.
D.ANCHORS: BUILT-IN AND POST-INSTALLED.
C.REINFORCING STEEL.
B.MEMBER SIZES.
A.LOCATIONS.
4.DIVISION 4 MASONRY
F.PROTECTION AND CURING PROCEDURES.
E.CONCRETE MIX AND PLACEMENT.
D.ANCHORS: CAST-IN AND POST-INSTALLED.
C.REINFORCING STEEL.
B.FORMWORK AND MEMBER SIZES.
A.LOCATIONS.
3.DIVISION 3 CONCRETE:
D.FILL AND BACKFILL.
C.PREPARATION OF SOILS/SURFACES SUPPORTING CONSTRUCTION.
B.ADEQUACY OF EXPOSED SURFACE TO PROVIDE REQUIRED SUPPORT.
A.EXCAVATION DEPTH.
2.DIVISION 2 SITE CONSTRUCTION (EARTHWORK)
AND CONSTRUCTION. SEE SPECIFICATION SECTION 01455 FOR DETAILS.
1. SPECIAL INSPECTION IS REQUIRED FOR THE FOLLOWING STRUCTURAL MATERIALS A. 05500 TRASH RACK GRATING.
1. DIVISION 5 METALS.
DEFERRED DESIGN SUBMITTALS FOR THIS PROJECT INCLUDE:
SUBSEQUENTLY SUBMITTED TO THE BUILDING OFFICIAL.
THAT ARE TO BE REVIEWED BY THE REGISTERED DESIGN PROFESSIONAL AND
OF THE DESIGN THAT ARE NOT SUBMITTED AT THE TIME OF PERMIT APPLICATION, AND
AS DEFINED IN THE BUILDING CODE, DEFERRED DESIGN SUBMITTALS ARE PORTIONS
DISCREPANCIES
OPENINGS.
8.SEE STRUCTURAL DRAWINGS FOR LOCATIONS AND SIZES OF DOOR AND WINDOW D. SEE MECHANICAL DRAWINGS FOR EQUIPMENT PADS AND PIPE SUPPORTS.
AND ASSOCIATED STRUCTURAL REQUIREMENTS.
C. SEE MECHANICAL DRAWINGS FOR DETAILS OF PIPE PENETRATIONS, PIPE SUPPORTS, DIAMETER ARE NOT SHOWN ON THE STRUCTURAL DRAWINGS.
B. IN GENERAL, OPENINGS, EMBEDMENTS, AND PENETRATIONS LESS THAN 12 INCHES IN ITEMS AND EQUIPMENT FURNISHED.
A. CONFIRM SIZE AND LOCATIONS OF OPENINGS, PENETRATIONS AND EMBEDMENT FOR STRUCTURES.
CONDUITS, AND OTHER ITEMS THAT ARE EMBEDDED INTO OR PASS THROUGH
7.DRAWINGS PREPARED BY OTHER DISCIPLINES INCLUDE OPENINGS, ANCHORS, PIPES, TO WHICH SITE COORDINATES REFER ARE SHOWN ON THE STRUCTURAL PLANS.
6.SEE CIVIL DRAWINGS FOR STRUCTURE COORDINATES. POINTS ON THE STRUCTURES ORIENTATION REQUIRED AT THAT STRUCTURE.
CONCRETE) IS GENERALLY ARBITRARY. SEE DRAWINGS OF EACH STRUCTURE FOR REINFORCEMENT (WHETHER “LINES” OR “DOTS”ARE CLOSER TO THE FACE OF THE B. IN STRUCTURAL TYPICAL DETAILS, ORIENTATION OF BARS IN EACH MAT OF TITLES, EVEN WHEN NOT SPECIFICALLY REFERENCED ON THE DRAWINGS.
A. TYPICAL DETAILS ARE INTENDED TO APPLY AT LOCATIONS DESCRIBED BY THEIR
5.TYPICAL DETAILS ARE INCLUDED ON THE “TS” DRAWINGS.
B. SIZES AND LOCATIONS OF EQUIPMENT PADS FOR EQUIPMENT SELECTED.
A. DIMENSIONS AND WEIGHTS FOR EQUIPMENT SELECTED.
FOLLOWING BEFORE PREPARATION AND SUBMITTAL OF SHOP DRAWINGS:
DIMENSIONS, AND INFORMATION SHOWN ON THESE DRAWINGS. CONFIRM THE
IMMEDIATELY OF BETWEEN EXISTING CONDITIONS AND
4.VERIFY DIMENSIONS AND CONDITIONS BEFORE BEGINNING WORK. ADVISE ENGINEER SHOWS CONSTRUCTION AT AND BELOW ELEVATION 110.)
C. PLANS ARE TREATED AS HORIZONTAL SECTIONS. (I.E.: “PLAN AT ELEVATION 110” B. WRITTEN DIMENSIONS TAKE PRECEDENCE OVER SCALED SIZES.
A. SCREENED LINE WORK INDICATES EXISTING CONDITIONS.
3.PRESENTATION CONVENTIONS FOR STRUCTURAL DRAWINGS:
INDICATED IN THE GENERAL NOTES AND TYPICAL DETAILS.
2.UNLESS DETAILED, SPECIFIED, OR INDICATED OTHERWISE, CONSTRUCTION SHALL BE AS DISCIPLINES AND WITH THE SPECIFICATIONS.
1.USE STRUCTURAL DRAWINGS IN CONJUNCTION WITH PROJECT DRAWINGS BY OTHER PRIOR TO CASTING OF CONCRETE.
1. AFTER REINFORCING STEEL AND STRUCTURAL EMBEDS ARE IN PLACE, BUT C.ELEVATED SLABS
PRIOR TO CASTING OF CONCRETE.
1. AFTER REINFORCING STEEL AND STRUCTURAL EMBEDS ARE IN PLACE, BUT B.CONCRETE WALLS
PRIOR TO CASTING OF CONCRETE.
1. AFTER REINFORCING STEEL AND STRUCTURAL EMBEDS ARE IN PLACE, BUT A. FOUNDATIONS
2. ALL STRUCTURAL IN ALL AREAS:
CONSTRUCTION WHILE CORRECTIONS CAN BE MADE.
1. STRUCTURAL OBSERVATION IS REQUIRED DURING AND AT SPECIFIC STAGES OF STRUCTURAL OBSERVATION:
1. NORMAL DENSITY.
2. MINIMUM SPECIFIED CONCRETE COMPRESSIVE STRENGTH, f’c (AT 28 DAYS UNO).
A. STRUCTURES: “CLASS A”& DRILLED PIERS f’c = 4500 PSI.
B. FILL AND THRUST BLOCKS: “CLASS C” f’c = 2500 PSI.
C. PIPE ENCASEMENT: “CLASS A” f’c = 4500 PSI.
D. ELECTRICAL DUCT ENCASEMENT: “CLASS CE” f’c = 3000 PSI.
MATERIAL.
B.COVER PLATE AND ITS SEATS OR SUPPORTS SHALL BE OF THE SAME OTHERWISE NOTED.
A.ALUMINUM WITH TYPE 316 STAINLESS STEEL FASTENERS, UNLESS
3.COVER PLATES:
FASTEN GRATING TO SUPPORTS AS INDICATED IN S559/TYP.
C.UNLESS INDICATED ON THE DRAWINGS AS “REMOVABLE GRATING”, SECURELY B.GRATING AND ITS SEATS OR SUPPORTS SHALL BE OF THE SAME MATERIAL.
OTHERWISE NOTED.
A.ALUMINUM WITH TYPE 316 STAINLESS STEEL FASTENERS, UNLESS
2.GRATING:
A.ALUMINUM, EXCEPT WHERE OTHER MATERIALS ARE NOTED.
1. HANDRAILS AND GUARDRAILS:
METAL FABRICATIONS:
SLIDING COEFFICIENT OF FRICTION: 0.3 0.3
AT REST (PSF/FT): 65 65
ACTIVE (PSF/FT): 50 50
STATIC SEISMIC
SURCHARGE: EQUIVALENT TO 2 FEET OF SOIL ABOVE FINISHED GRADE.
B. LATERAL EARTH PRESSURE (UNO):
A. NET ALLOWABLE BEARING PRESSURE SEE PLANS.
INVESTIGATION REPORT.
2. FOUNDATION DESIGNS ARE BASED ON RECOMMENDATIONS IN THE GEOTECHNICAL REPORT NO: CRAWFORD FILE NO. 19-503.1 DATED: FEBRUARY 2023.
PREPARED BY: CRAWFORD AND ASSOCIATES.
PHASE 4 DESIGN PROJECT
TITLE: GEOTECHNICAL REPORT CITY OF UKIAH RECYCLED WATER PIPELINE
1. GEOTECHNICAL INVESTIGATION REPORT:
(AWS) A2.4.
2.WELDING: SYMBOLS: IN ACCORDANCE WITH AMERICAN WELDING SOCIETY FOR DEFINITION OF MATERIALS SHADING PATTERNS.
1. SEE DRAWING 00G03 FOR KEY TO DRAWING TITLES AND SECTION CUTS, AND
BAR SIZE)
# NUMBER (REINFORCING
T.O. TOP OF
O.F. OUTSIDE FACE
I.F. INSIDE FACE
EF EACH FACE PL PLATE
BO BOTTOM OF L ANGLE
REINFORCEMENT: OTHER:
ABBREVIATIONS HAVE THE MEANINGS LISTED.
WHEN USED ON THE STRUCTURAL DRAWINGS, THE FOLLOWING
4. ABBREVIATIONS FOR STRUCTURAL DRAWINGS:
THE ALUMINUM ASSOCIATION’S ALUMINUM DESIGN MANUAL, CURRENT EDITION.
B.ALUMINUM: ABBREVIATIONS AND DESIGNATIONS ARE IN ACCORDANCE WITH MANUAL, CURRENT EDITION.
AMERICAN INSTITUTE OF STEEL CONSTRUCTION’S STEEL CONSTRUCTION A.STEEL: ABBREVIATIONS AND DESIGNATIONS ARE IN ACCORDANCE WITH THE
3. STRUCTURAL MEMBERS:
PROJECT SPECIFICATIONS.
2. ABBREVIATIONS FOR NAMES OF TECHNICAL GROUPS MAY BE FOUND IN THE
1. SEE DRAWING 00G03 FOR GENERAL LIST OF ABBREVIATIONS USED ON DRAWINGS.
C. WELDS - SHIELDED METAL ARC PROCESS USING E70-XX ELECTRODES.
ASTM F 1554, GRADE 36 GALVANIZED.
ASTM F 593, STAINLESS TYPE 316
ANCHOR BOLTS WITH HEX FORGED HEAD.
B. BOLTS - STEEL TO CONCRETE OR MASONRY:
ASTM A 325 HIGH-STRENGTH BOLTS, WITH LOAD INDICATOR WASHERS.
A. BOLTS - STEEL TO STEEL:
2. CONNECTIONS:
SQUARE AND RECTANGULAR: ASTM A 500, GRADE B (Fy = 46 KSI) ROUND: ASTM A 500, GRADE B (Fy = 42 KSI)
E. HOLLOW STRUCTURAL SECTIONS:
D. PIPES: ASTM A 53, GRADE B (Fy = 35 KSI)
C. PLATES AND BARS: ASTM A 36 (Fy = 36 KSI)
B. SHAPES S, ST, M, MT, HP, C, MC, L: ASTM A 36 (Fy = 36 KSI) A. SHAPES W, WT: ASTM A 992 (Fy = 50 KSI)
1. SECTIONS
E
H
ANCHORS.
LOCATIONS OF REINFORCEMENT IN MEMBERS BEFORE DRILLING HOLES FOR ANCHORS. USE NON-DESTRUCTIVE TESTING EQUIPMENT TO IDENTIFY B.DO NOT CUT, DAMAGE, OR INTERRUPT EXISTING REINFORCEMENT TO INSTALL EVALUATION REPORT AND MANUFACTURER’S INSTRUCTIONS.
A.INSTALL IN FULL COMPLIANCE WITH ACCEPTED BUILDING CODE
4.POST-INSTALLED ANCHORS IN CONCRETE AND MASONRY:
ALUMINUM SURFACES AS SPECIFIED IN SECTION 09960.
B.WHERE ALUMINUM IS IN CONTACT WITH MASONRY OR CONCRETE, COAT ISOLATING SLEEVES AND WASHERS AS SPECIFIED IN SECTION 05190.
AND STAINLESS STEEL, OR ALUMINUM AND STEEL) PROVIDE
A.AT BOLTED CONNECTIONS THAT INCLUDE DIFFERENT METALS (E.G.: STEEL
3.INTERFACE BETWEEN MATERIALS:
BEING JOINED, AND FULL LENGTH OF THE JOINT.
A.FILLET WELDS: PER AWS CODE BASED ON THE THICKNESS OF THE MATERIALS
2.WELDED:
EDGE OF A PLATE OR STRUCTURAL ELEMENT.
C.WITH A DISTANCE OF AT LEAST 1 1/2 INCHES FROM CENTER OF BOLT TO ANY CENTER.
B.HAVING A MINIMUM OF 2 BOLTS, SPACED NOT CLOSER THAN 3 INCHES ON A.MADE USING 3/4-INCH DIAMETER BOLTS.
1. BOLTED:
STEEL, STAINLESS STEEL, AND ALUMINUM - CONNECTIONS:
A.FULLY GROUTED.
4.GROUTING:
DRAWINGS OR ACCEPTED IN ADVANCE BY THE ENGINEER.
3.WELDING OF REINFORCING IS NOT PERMITTED UNLESS DETAILED ON THE B.AT OPENINGS AS INDICATED IN S410/TYP.
A.AT CORNERS AND JUNCTIONS AS INDICATED IN S412/TYP.
2.PROVIDE REINFORCING:
1. SEE S400/TYP FOR MASONRY NOTES, INCLUDING LAP SPLICE LENGTHS.
MASONRY:
B. HOUSEKEEPING PAD FOR ELECTRICAL EQUIPMENT SEE S350/TYP.
A. EQUIPMENT PAD SEE S302/TYP.
8. CONCRETE PADS
7.FINISH CONCRETE AS SPECIFIED IN SECTION 03366.
AND EMBEDMENTS.
6.MAINTAIN MINIMUM 3 INCHES CLEAR CONCRETE COVER BETWEEN REINFORCING DRAWINGS OR ACCEPTED IN ADVANCE BY THE ENGINEER.
5.WELDING OF REINFORCING IS NOT PERMITTED UNLESS DETAILED ON THE B.AT OPENINGS - AS INDICATED IN S180/TYP.
ADDED BARS WHERE INDICATED ON THE DRAWINGS.
A.AT CORNERS AND JUNCTIONS - AS INDICATED IN S144/TYP, SUPPLEMENT WITH
4.PROVIDE REINFORCING:
SPECIFICATION 03102 FOR CHAMFERS.
3.PROVIDE CHAMFER AT EXPOSED EDGES OF CAST-IN-PLACE CONCRETE. SEE ACCEPTANCE BY THE ENGINEER BEFORE FORM LAYOUT.
2.SUBMIT LOCATIONS OF CONSTRUCTION JOINTS NOT SHOWN ON THE DRAWINGS FOR LENGTH REQUIREMENTS FOR REINFORCING.
1. SEE S101/TYP FOR CONCRETE NOTES, INCLUDING CLEAR COVER AND LAP SPLICE CONCRETE:
SPECIAL INSPECTION
E. STORAGE POND: “CLASS A” f’c = 5000 PSI.
Digitally signed by Jitesh
Contact Info: Carollo Engineers, Inc
Date: 2023.04.07 14:22:13-07'00'
4'-6"
3'-6"
REV DATE BY DESCRIPTION
DATE
CHECKED
DRAWN
DESIGNED
8660F.10
JOB NO.
DRAWING NO.
SHEET NO.
SCALES ACCORDINGLY
VERIFY SCALES
THIS SHEET, ADJUST
IF NOT ONE INCH ON
BAR IS ONE INCH ON
ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200
CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 86094
P
lotD
ate: 07-APR
-2023 11:40:56
AM
U
ser:svcPW
Model:
Layout1 C
olorTable:gshade.ctb
D
esignS
cript:
C
arollo_S
td_P
en_v0905.pen
P
lotScale:1:1
85S01
LA
S
T
SAVED
B
Y:
PROJECT NO. FILE NAME:
STRUCTURAL
8660F10 8660F1085S01.dgn
C
85S02
A 3/16"=1'-0"
CLARIFIER NO.4 CLARIFIER NO.3 CLARIFIER NO.2
FILTER NO.4 FILTER NO.3 FILTER NO.2 FILTER NO.1
#
GENERAL NOTES:
KEY NOTES:
AWT CLARIFIER/FILTER PLAN
B
85S02
8660F1085S100
CLARIFIER NO.1
1 85S02
WORK SEQUENCING).
SPECIFICATION SECTION 01140 FOR CONSTRAINTS AND POSSIBLE
DONE DURING THE MEDIA REPLACEMENT PROCESS (REFER TO
2. ACCESSING ALL OF THE SURFACE REQUIRES THIS WORK TO BE CONTRACTOR TO FIELD VERIFY EXISTING DIMENSIONS.
1. BACKGROUND IS BASED ON THE 1994 RECORD DRAWINGS.
kjackson
D
85S02 2 (TYP)
1 (TYP)
KP
TU
56 TYP
(TYP) S304
(TYP)
(TYP
)
SECTION 09960.
SURFACES OF THE COLLECTION TROUGHS PER SPECIFICATION
2. CONTRACTOR TO FULLY RECOAT THE INTERIOR AND EXTERIOR SECTION 09960 DURING THE MEDIA REPLACEMENT PROCESS.
SURFACES OF THE CLARIFIER/FILTER TANKS PER SPECIFICATION
1. CONTRACTOR TO FULLY RECOAT INTERIOR AND EXTERIOR
JKN
Digitally signed by Jitesh
Contact Info: Carollo Engineers, Inc
Date: 2023.04.07 14:23:26-07'00'
4'-6"
1'-0"
3'-6"
1'-0"
REV DATE BY DESCRIPTION
DATE
CHECKED
DRAWN
DESIGNED
8660F.10
JOB NO.
DRAWING NO.
SHEET NO.
SCALES ACCORDINGLY
VERIFY SCALES
THIS SHEET, ADJUST
IF NOT ONE INCH ON
BAR IS ONE INCH ON
ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200
CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 86094
P
lotD
ate: 07-APR
-2023 11:41:01
AM
U
ser:svcPW
Model:
Layout1 C
olorTable:gshade.ctb
D
esignS
cript:
C
arollo_S
td_P
en_v0905.pen
P
lotScale:1:1
85S02
LA
S
T
SAVED
B
Y:
PROJECT NO. FILE NAME:
STRUCTURAL
8660F10 8660F1085S02.dgn
#
GENERAL NOTES:
KEY NOTES:
AWT CLARIFIER/FILTER
1 85S01
866F1085S02A
B
85S01
C
85S01
SECTIONS AND PHOTO
3/8"=1'-0"
3/8"=1'-0"
8660F1085S9303
8660F1085S9304
1 kjackson
3/8"=1'-0"
8660F1085S9305
D
85S01
COLLECTION TROUGH
3 2 4
1. REFER TO GENERAL NOTES ON 00S01.
TU
KP
57 TYP
(TYP) S304
TYP
(TYP) S304
(TYP)
(TYP
)
(TYP)
(TYP
)
TROUGH.
4. CONTRACTOR TO FIELD VERIFY DIMENSIONS OF COLLECTION
SECTION 09960.
SURFACES OF THE CLARIFIER/FILTER TANKS PER SPECIFICATION
3. CONTRACTOR TO FULLY RECOAT THE INTERIOR AND EXTERIOR SECTION 09960.
SURFACES OF THE COLLECTION TROUGHS PER SPECIFICATION
2. CONTRACTOR TO FULLY RECOAT THE INTERIOR AND EXTERIOR AWT CLARIFIER/FILTER TANK HAS SIX ANCHOR BOLTS.
1. REPAIR AND REPLACE EXISTING ANCHOR BOLTS AS NEEDED. EACH JKN
Digitally signed by Jitesh
Contact Info: Carollo Engineers, Inc
Date: 2023.04.07 14:24:27-07'00'
5'-0"
18'-0"13'-0" 1'-0"
1'-0" 8'-0"
10'-0"
1'-6"
10"
4'-0"
2'-10" 3'-0"
REV DATE BY DESCRIPTION
DATE
CHECKED
DRAWN
DESIGNED
8660F.10
JOB NO.
DRAWING NO.
SHEET NO.
SCALES ACCORDINGLY
VERIFY SCALES
THIS SHEET, ADJUST
IF NOT ONE INCH ON
BAR IS ONE INCH ON
ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200
CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 86094
P
lotD
ate: 07-APR
-2023 11:41:16
AM
U
ser:svcPW
Model:
Layout1 C
olorTable:gshade.ctb
D
esignS
cript:
C
arollo_S
td_P
en_v0905.pen
P
lotScale:1:1 LA
S
T
SAVED
B
Y:
PROJECT NO. FILE NAME:8660F1091S01.dgn
STRUCTURAL
PLANS
8660F10
91S01
(TYP)
D
A 3/8"=1'-0"
866F1091S100
B 3/8"=1'-0"
866F1091S101
91S02
D
91S02
#
GENERAL NOTES:
KEY NOTES:
TU
(TYP
)
(TYP)
(TYP
)
AND PIPE PENETRATION WITH MECHANICAL DRAWINGS.
1. CONTRACTOR SHALL VERIFY SIZE, LOCATION OF PIPE,
1 C
91S02
1'-6"
KP
(TYP)
12" DIA OPENING
C
91S02
PAU PUMP STATION
PAU PUMP STATION - FOUNDATION PAU PUMP STATION - TOP
1. FOR GENREAL STRUCTURAL NOTES, REFER TO DRAWING 00S01. kjackson
58 JKN
SPECIFICATION 05500
ACCESS LADDER PER
SPECIFICATION 08320. PROVIDE
BILCO TYPE J-AL OR SIMILAR, SEE
SINGLE LEAF ACCESS HATCH 3'-0".
Digitally signed by Jitesh
Contact Info: Carollo Engineers, Inc
Date: 2023.04.07 14:25:58-07'00'
LAP
2'-10"
#5@12"
1'-0"
FINISHED GRADE
H2E
#8@12"
REV DATE BY DESCRIPTION
DATE
CHECKED
DRAWN
DESIGNED
8660F.10
JOB NO.
DRAWING NO.
SHEET NO.
SCALES ACCORDINGLY
VERIFY SCALES
THIS SHEET, ADJUST
IF NOT ONE INCH ON
BAR IS ONE INCH ON
ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200
CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 86094
P
lotD
ate: 07-APR
-2023 12:20:28
PM
U
ser:svcPW
Model:
Layout1 C
olorTable:gshade.ctb
D
esignS
cript:
C
arollo_S
td_P
en_v0905.pen
P
lotScale:1:1 LA
S
T
SAVED
B
Y:
PROJECT NO. FILE NAME:8660F1091S02.dgn
STRUCTURAL
8660F10
91S02
#
GENERAL NOTES:
KEY NOTES:
1 TOP OF BERM 581.00
TOC 565.00
C
91S01 3/8"=1'-0"
866F1091SS300
D
91S01 3/8"=1'-0"
866F1091SS300
SECTIONS
GRADE
FINISHED
TYP
S180
TU
KP
(TYP
)
SPLIC
E
TOC 582.00
TOP OF CURB 583.00
LAP SPLICE(TYP)
PAU PUMP STATION
#6@12" T&B
#6@12" T&B
(TYP)
#7@12" EF
INVERT 569.00
T&B H2E
#8@12"
1. FOR GENERAL STRUCTURAL NOTES, REFER TO DRAWING 00S01. kjackson
59 JKN
2 GEOTECHNICAL REPORT.
2. OVER EXCAVATION, COMPACTION AND AGGREGATE BASE PER
PENETRATION WITH MECHANICAL DRAWINGS.
1. CONTRACTOR SHALL VERIFY SIZE, LOCATION OF PIPE, AND PIPE 2 (2) #5 CIRCULAR BAR
TYP
(W/WSTP) S140
(TYP) EF
#7@12"
Digitally signed by Jitesh
Contact Info: Carollo Engineers, Inc
Date: 2023.04.07 14:26:57-07'00'
2'-0"
1'-0"
6"
2'-8"
1'-0"
5'-0" 1'-6" 1'-0"
1'-0"
2'-0" 2'-0" 2'-0" 1'-6" 2'-0"EM
B
ED
2'-0"
9"
6'-0"
REV DATE BY DESCRIPTION
DATE
CHECKED
DRAWN
DESIGNED
8660F.10
JOB NO.
DRAWING NO.
SHEET NO.
SCALES ACCORDINGLY
VERIFY SCALES
THIS SHEET, ADJUST
IF NOT ONE INCH ON
BAR IS ONE INCH ON
ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200
CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 86094
P
lotD
ate: 07-APR
-2023 11:40:44
AM
U
ser:svcPW
Model:
Layout1 C
olorTable:gshade.ctb
D
esignS
cript:
C
arollo_S
td_P
en_v0905.pen
P
lotScale:1:1 LA
S
T
SAVED
B
Y:
PROJECT NO. FILE NAME:8660F1091S03.dgn
STRUCTURAL
8660F10
91S03
#
GENERAL NOTES:
KEY NOTES:
PLAN AND SECTION
16"-PVC
1/4
TYP
1 BEN MEADOWS, AND FORESTRY SUPPLIERS.
STEEL PIPE OR FIBERGLASS. MANUFACTURERS INCLUDE STEVENS,
RECOMMENDED MATERIALS INCLUDE PORCELAIN ENAMELED IRON,
TO MINIMIZE MOVEMENT DUE TO WIND AND WAVE ACTION.
THAT RESIST RUST AND DISCOLORATION, AND STURDY ENOUGH
1. THE STAFF GAUGES SHOULD BE MADE OF A DURABLE MATERIAL(S) SCALE:
FILE:
F
-
SECTION
3/4" = 1'-0"
8660F1000S301
F
-
16"-PVC
1 INV 569.03
TU
1 TOE OF EMBANKMENT
AT 3:1 TO MATCH BASIN SLOPE
FACE OF STRUCTURE - SLOPE
COUPLING
TRANSITION
FLEXIBLE
TYP
SST BATTEN,
316 SST
HSS 4 x 4 x 1/4"
TYP
SST BATTEN,
PL 6 x 16 x 1/4"
PL 3 x 9 x 1/4"
#5@12 EW
TRASH RACK
APRON
FLUSH WITH CONCRETE OUTLET AT
ENCASED IN CONCRETE. CUT ELBOW
INSTALL 16" DIA 90 DEG PVC ELBOW
FLEXIBLE COUPLING
#5 @ 12" EWEF
EL 570.00
BOTTOM OF POND
1 KP
PAU PUMP STATION INLET STRUCTURE
SCALE:
FILE:
E
3/4" = 1'-0"
866F1091S102
PLAN
91C08
kjackson
60 JKN
GEOTECHNICAL REPORT.
3. OVER EXCAVATION, COMPACTION AND AGGREGATE BASE PER
PERFORATED SUPPORT SLEEVE.
FOUNDATION TO BE USED TO SUPPORT LEVEL TRANSDUCER
2. INTERMEDIATE DEPTH GAUGE TO BE LOCATED AS SHOWN IN C-26.
DIMENSION TO BE DETERMINED AFTER GRATE IS APPROVED.
PROFESSIONAL ENGINEER IN STATE OF CALIFORNIA. FINAL
CALCULATIONS STAMPED AND SIGNED BY A REGISTERED
CONTRACTOR SHALL PROVIDE SHOP DRAWINGS AND
DESIGNED AND DETAILED FOR A LIVE LOAD OF 100 PSF.
1. CONTRACTOR SHALL PROVIDE STAINLESS STEEL TRASH GRATE 3 3
Digitally signed by Jitesh
Contact Info: Carollo Engineers, Inc
Date: 2023.04.07 14:28:22-07'00'
1'-0"
5'-0" 1'-0"
2'-0" 3'-4"
1'-0"
6"
1'-0"
1'-0"
6'-0"
2'-0"
2'-0" 2'-0" 2'-0" 1'-6" 2'-0"EM
B
ED
9"
REV DATE BY DESCRIPTION
DATE
CHECKED
DRAWN
DESIGNED
8660F.10
JOB NO.
DRAWING NO.
SHEET NO.
SCALES ACCORDINGLY
VERIFY SCALES
THIS SHEET, ADJUST
IF NOT ONE INCH ON
BAR IS ONE INCH ON
ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200
CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 86094
P
lotD
ate: 07-APR
-2023 11:40:51
AM
U
ser:svcPW
Model:
Layout1 C
olorTable:gshade.ctb
D
esignS
cript:
C
arollo_S
td_P
en_v0905.pen
P
lotScale:1:1 LA
S
T
SAVED
B
Y:
PROJECT NO. FILE NAME:8660F1095S01.dgn
STRUCTURAL
8660F10
95S01
GENERAL NOTES:
PLAN AND SECTION
SCALE:
FILE:
J
-
SECTION
3/4" = 1'-0"
8660F1000S302
J
-
(TYP
)
16"-PVC
16"-PVC
1 1
TU
(TYP
)
# KEY NOTES:
BEN MEADOWS, AND FORESTRY SUPPLIERS.
STEEL PIPE OR FIBERGLASS. MANUFACTURERS INCLUDE STEVENS,
RECOMMENDED MATERIALS INCLUDE PORCELAIN ENAMELED IRON,
TO MINIMIZE MOVEMENT DUE TO WIND AND WAVE ACTION.
THAT RESIST RUST AND DISCOLORATION, AND STURDY ENOUGH
1. THE STAFF GAUGES SHOULD BE MADE OF A DURABLE MATERIAL(S) 316 SST 1
HSS 4 x 4 x 1/4"
AT 3:1 TO MATCH BASIN SLOPE
FACE OF STRUCTURE - SLOPE
COUPLING
TRANSITION
FLEXIBLE
TYP
SST BATTEN,
TOE OF EMBANKMENT
TYP
SST BATTEN,
TRASH RACK
#5@12 EW #5 @ 12" EWEF
1/4
TYP
1 PL 6 x 16 x 1/4"
PL 3 x 9 x 1/4"
TRASH RACK
FLEXIBLE COUPLING
KP
INV 568.46
PAU INLET STRUCTURE
SCALE:
FILE:
H
3/4" = 1'-0"
866F1091S103
PLAN
91C07
kjackson
61 JKN
GEOTECHNICAL REPORT.
3. OVER EXCAVATION, COMPACTION AND AGGREGATE BASE PER
PERFORATED SUPPORT SLEEVE.
FOUNDATION TO BE USED TO SUPPORT LEVEL TRANSDUCER
2. INTERMEDIATE DEPTH GAUGE TO BE LOCATED AS SHOWN IN C-26.
DIMENSION TO BE DETERMINED AFTER GRATE IS APPROVED.
PROFESSIONAL ENGINEER IN STATE OF CALIFORNIA.. FINAL
CALCULATIONS STAMPED AND SIGNED BY A REGISTERED
CONTRACTOR SHALL PROVIDE SHOP DRAWINGS AND
DESIGNED AND DETAILED FOR A LIVE LOAD OF 100 PSF.
1. CONTRACTOR SHALL PROVIDE STAINLESS STEEL TRASH GRATE 3 3
BOTTOM OF POND EL 570.78
Digitally signed by Jitesh
Contact Info: Carollo Engineers, Inc
Date: 2023.04.07 14:29:07-07'00'
REV DATE BY DESCRIPTION
DATE
CHECKED
DRAWN
DESIGNED
8660F.10
JOB NO.
DRAWING NO.
SHEET NO.
SCALES ACCORDINGLY
VERIFY SCALES
THIS SHEET, ADJUST
IF NOT ONE INCH ON
BAR IS ONE INCH ON
ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200
CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 86094
P
lotD
ate:3/23/2023
3:00:58
PM
JKN
JLG
KP
99S01
62 STRUCTURAL
ELECTRICAL BUILDING
FOUNDATION PLAN
8660F1099S01.dw
g
kjackson 8660F10
24'-0"
14'-0"
ELECTRICAL ROOM
3'-4" 4'-4"
6'-8" 1'-4"
B
8660F1001S100
FOUNDATION PLAN
1/2" = 1'-0"
(TYP)
1'-0"
(TYP
)
1'-0"
P
99S03
FULLY GROUTED
12" CMU WALL (TYP)
TYP
CR314
GENERAL NOTES:
KEY NOTES:
MECHANICAL EQUIPMENT.
6. COORDINATE OPENING SIZE AND LOCATION WITH
MANUFACTURER'S ANCHORAGE REQUIREMENTS.
MECHANICAL DRAWINGS AND EQUIPMENT
EQUIPMENT PADS WITH ELECTRICAL AND
5. COORDINATE LOCATION AND DIMENSIONS OF ALL
FINISHED WITH WATER REPELLANT.
4. EXTERIOR CONCRETE MASONRY UNITS TO BE
S451/TYPE AND S461/TYPE.
S410/TYPE, S412/TYPE, S430/TYPE, S440/TYPE,
3. FOR MASONRY DETAILS, SEE DETAILS S400/TYPE,
2. FOR DOOR SCHEDULES, REFER TO DRAWING 99A01.
DRAWING 00S01.
1. FOR GENERAL STRUCTURAL NOTES, REFER TO
#
FXE
FXE
4 1
2 101
3 3
101-1
101-2
EQUIPMENT REQUIREMENTS.
REFERENCE ELECTRICAL DRAWINGS FOR
REFER TO SPECIFICATION SECTION 10520.
FIRE EXTINGUISHER PER DETAIL AN400/TYPE.
SPECIFICATION SECTION 08110.
HOLLOW METAL DOOR AND FRAME REFER TO
IN FULLY GROUTED CMU WALL.
PROVIDE #5@16" EACH WAY EACH FACE REBAR
UNIT. REFER TO SPECIFICATION SECTION 04220.
12''x8''x16'' STANDARD CONCRETE MASONRY
TYP
S350
TYP
S350
(TYP)
2 (TYP)
MCJ
(TYP)
12'-0"
G
99A02
H
99A02
E
99A02
F
99A02
TYP ALL AROUND
TOC 602.25
(TYP)
MCJ
TYP
CR314
1'-0"
TOC 602.25
1'-4"
1. 2.
3. 4.
Digitally signed by Jitesh
Contact Info: Carollo Engineers, Inc
Date: 2023.04.07 14:29:55-07'00'
REV DATE BY DESCRIPTION
DATE
CHECKED
DRAWN
DESIGNED
8660F.10
JOB NO.
DRAWING NO.
SHEET NO.
SCALES ACCORDINGLY
VERIFY SCALES
THIS SHEET, ADJUST
IF NOT ONE INCH ON
BAR IS ONE INCH ON
ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200
CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 86094
P
lotD
ate:3/23/2023
3:45:47
PM
GENERAL NOTES:
S720/TYP.
WIDTH. PROVIDE ROOF OPENING AS PER DETAIL
SHALL BE LIMITED TO 12" IN DIAMETER OR
MANUFACTURER. MAXIMUM ROOF OPENING
EQUIPMENT AND APPROVED HVAC
LOCATION AS REQUIRED WITH MECHANICAL
5. COORDINATE ROOF OPENING SIZE AND
DIRECTION.
4. INDICATES METAL DECK SPAN
DRAWING 00S01.
3. FOR GENERAL STRUCTURAL NOTES SEE
TO DRAWING 98A01.
2. FOR GENERAL ARCHITECTURAL NOTES, REFER
ROOF DESIGN DEAD LOAD = 20 PSF
ROOF DESIGN LIVE LOAD = 20 PSF
1. ROOF LOADING:
JKN
JLG
KP
99S02
63 STRUCTURAL
ELECTRICAL BUILDING
ROOF FRAMING AND ROOF PLANS
8660F1099S02.dw
g
kjackson 8660F10
C
8660F1001S101
ROOF FRAMING
1/2" = 1'-0"
4 EQ SPACES @5'-6" = 22'-0"
1 2
P
99S03
TYP
AC310
TYP
S708
TYP
S451
AROUND
TYP ALL
HPT 615.25
LPT 615.00
3 S
LO
PE
1/4'PER
FOO
T
2 4
12'-0"
CL
P
99S03
TYP
AG225
W/ CAGE
TYP
AG222
(TYP)
TAPERED RIGID INSULATION.
SLOPE OF THE ROOF SHALL BE ACHIEVED BY
RECOMMENDED BY MANUFACTURER.
SEAL SHALL INCLUDE CAULKING AND PLATE AS
WEATHERTIGHT CONDUIT PENETRATION SEAL.
ENGINEERS REVIEW A WATERPROOF AND
EXISTING CONDITIONS AND PROVIDE FOR
CONTRACTOR SHALL COORDINATE WITH
PROVIDED BY THE CONTRACTOR.
MEET APPLICABLE BUILDING CODES SHALL BE
FRAMING AND ATTACHMENTS ANCHORED TO
STRUCTURAL CALCULATIONS. SECONDARY
PROVIDE SEISMIC BRACING AS REQUIRED BY
SUSPENDED FROM ROOF PER MFR DETAIL.
REQUIREMENTS AND PLACEMENT. FCU
REFERENCE HVAC DRAWINGS FOR EQUIPMENT
MANUFACTURER.
CRICKET AS RECOMMENDED BY
PER DETAIL AG160/TYP.
PROTECTIVE BOARD AND RIGID INSULATION
TPO MEMBRANE ROOFING SYSTEM OVER
SPECIFICATION SECTION 07700.
AG220/TYP IN ACCORDANCE WITH
ALUMINUM COPING OVER PARAPET PER DETAIL
1 1/2" DEEP 18 GAUGE METAL DECK.
D
8660F1001S102
ROOF
1/2" = 1'-0"
W 10x30
W 10x30
W 10x30
3 E
Q SPAC
E
S
@
4'-8"=14'-0"
TYP
S451
(TYP)
W 10x30
W 10x30
MCJ (TYP)
TYP
S502
EXTERIOR
12" CMU WALL (TYP)
MCJ (TYP)
(TYP)
12'-0"
12'-0"
W 10x30W 10x30
TYP
S701
# KEY NOTES:
1. 2.
3. 4.
5. 6.
7 7.
Digitally signed by Jitesh
Contact Info: Carollo Engineers, Inc
Date: 2023.04.07 14:30:40-07'00'
REV DATE BY DESCRIPTION
DATE
CHECKED
DRAWN
DESIGNED
8660F.10
JOB NO.
DRAWING NO.
SHEET NO.
SCALES ACCORDINGLY
VERIFY SCALES
THIS SHEET, ADJUST
IF NOT ONE INCH ON
BAR IS ONE INCH ON
ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200
CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 86094
P
lotD
ate:4/5/202311:36:37
AM
GENERAL NOTES:
DRAWING 00S01.
2. FOR GENERAL STRUCTURAL NOTES SEE
TO DRAWING 99A01.
1. FOR GENERAL ARCHITECTURAL NOTES, REFER
JKN
JLG
KP
99S03
64 STRUCTURAL
ELECTRICAL BUILDING
SECTION
8660F1099S03.dw
g
kjackson 8660F10
P
99S01 1/2" = 1'-0"
86600F1001S300
TOC 602.25
EL 618.50 SUBGRADE PREPARATION.
1. REFER TO GEOTECHNICAL REPORT FOR
1 SLOPE
STEEL BEAM PER PLAN
#6@12" EW T&B
HOUSEKEEPING PADS.
LOCATIONS AND DIMENSIONS OF
2. REFER TO ELECTRICAL DRAWINGS FOR
TOS 616.25
2 (TYP)
TYP
AG227
TYP
AG225
TYP
AG160
CMU WALLS PER PLAN
12" FULLY GROUTED
2'-4"
99S02
# KEY NOTES:
Digitally signed by Jitesh
Contact Info: Carollo Engineers, Inc
Date: 2023.04.07 14:31:26-07'00'
REV DATE BY DESCRIPTION
DATE
CHECKED
DRAWN
DESIGNED
8660F.10
JOB NO.
DRAWING NO.
SHEET NO.
SCALES ACCORDINGLY
VERIFY SCALES
THIS SHEET, ADJUST
IF NOT ONE INCH ON
BAR IS ONE INCH ON
ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200
CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
A
B
C
D
E
F
G G
®
No. 86094
P
lotD
ate: 07-APR
-2023 11:42:14
AM
U
ser:svcPW
Model:
Layout1 C
olorTable:gshade.ctb
D
esignS
cript:
C
arollo_S
td_P
en_v0905.pen
P
lotScale:1:1
JKN
NGB
KP
99S04
65 STRUCTURAL
RECYCLED WATER PUMP STATION
PLAN AND SECTIONS
8660F1099S04.dwg
kjackson
8660F10
LA
S
T
SAVED
B
Y:
PROJECT NO. FILE NAME:
Q
8660F1001S130
1/4" = 1'-0"
R
- 1/2" = 1'-0"
8660F1001S330
GENERAL NOTES:
AND LOCATION.
2. REFER TO SHEET 99M02 FOR PUMP DETAILS
DRAWING 00S01.
1. FOR GENERAL STRUCTURAL NOTES, REFER TO
VERIFY DIMENSIONS WITH MANUFACTURER.
END REBAR WITH STD HOOK.
OPENING WITH MECHANICAL.
CONTRACTOR TO COORDINATE SIZE OF THE
HEIGHT OF THE CURB WALL IS 2'-0".
CURB WALL WITH PUMP MANUFACTURER. MAX
CONTRACTOR TO COORDINATE HEIGHT OF THE
TYP
S180
2 #6@12" EF VERT
(TYP)
3 1
#6@12" EF CIRC (TYP)
R
-
PER MFR
TYP
S130
#5@8" CIRCULAR
BARS EF (TYP)
#4 STIRRUPS
@8" (TYP)
1'-0"
PROVIDE
TEMPORARY
SHORING AS
NEEDED AND
CLSM BACKFILL
6" COMPACTED ABC
PROVIDE TEMPORARY
SHORING AS NEEDED
AND CLSM BACKFILL
10" COMPACTED ABC
SCARIFY 8" AND COMPACT TO
95% RELATIVE COMPACTION
1'-3"
1'-3"
W/O WSTP
1" EXP JT
TYP
S140
(TYP)
NATIVE SOIL
EL 587.08
S
-
S
- 1/2" = 1'-0"
8660F1001S330
#6@12" EW T&B
(TYP
)
10'-0"
51'-10"
#6@12" EF CIRC (TYP)
#6@12" EF VERT (TYP)
7'-6"
7'-6"
4 5'-6" 6'-4"
4 LP EL 602.33
HP EL 602.60
10'-0" 5'-6" 4'-6"
20'-0"
LP EL 602.33
SLOPE SLOPE
FG 602.00
TYP
S141
# KEY NOTES:
1. 2.
3. 4.
#6@12" EW T&B
1'-3"
Digitally signed by Jitesh
Contact Info: Carollo Engineers, Inc
Date: 2023.04.07 14:32:21-07'00'
2'-0"
R47'-6"
REV DATE BY DESCRIPTION
DATE
CHECKED
DRAWN
DESIGNED
8660F.10
JOB NO.
DRAWING NO.
SHEET NO.
SCALES ACCORDINGLY
VERIFY SCALES
THIS SHEET, ADJUST
IF NOT ONE INCH ON
BAR IS ONE INCH ON
ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200
CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
AB
CD
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
AB
CD
E
F
G G
®
PURPOSES.
CONSTRUCTION
IS NOT TO BE USED FOR
2023, CA PE NO. 76832. IT
OF BRIAN W. AVON, APRIL
UNDER THE AUTHORITY
PURPOSE OF BIDDING
RELEASED FOR THE
THIS DOCUMENT IS
CHANGE DURING CONSTRUCTION.
DRAWINGS WILL BE PROVIDED AS A DESIGN
NOT FOR CONSTRUCTION. CONSTRUCTION
THIS DRAWING IS FOR BID PURPOSES ONLY.
PlotDate:3/23/20234:28:55PM
GENERAL NOTES:
CONSTRUCTION.
12. FOR BIDDING PURPOSES, NOT FOR
TANK DESIGNER.
11. FINAL TANK DESIGN TO BE DETERMINED BY THE
DESIGN AND APPROVED BY THE OWNER.
HATCHES TO BE COORDINATED WITH TANK
10. FINAL COORDINATES FOR THE ACCESS
PIPING.
9. SEE SHEET 99C19 FOR CONTINUATION OF YARD
CONCRETE TANK.
DETAILED DESIGN FOR THE PRESTRESSED
8. COORDINATE ALL PIPE PENETRATIONS WITH
S110/TYP.
7. FOR CONSTRUCTION JOINT SEE DETAIL
WITH CLOSED LOOP ALL AROUND JOINTS.
S107/TYP. WATERSTOP SHALL BE CONTINUOUS
6. FOR WATERSTOP SEE DETAILS S106/TYP AND
NOTED OTHERWISE.
316/316L FOR WELDING FABRICATIONS UNLESS
5. ALL STAINLESS STEEL SHALL BE A MINIMUM OF
CABLES, JOINTS, ETC. ARE NOT SHOWN.
STEEL, PRESTRESSING CONNECTIONS, SEISMIC
WATERSTOPS, BEARING PADS, REINFORCING
ASPECTS OF THE TANK, INCLUDING SHOTCRETE
FOR AWWA D110, TYPE I TANK. DETAILED
4. DRAWINGS SHOW THE GENERAL ARRANGEMENT
SPECIFICATION 13207.
WITH THE REQUIREMENTS SET FORTH IN
QUALIFIED TANK CONTRACTOR IN ACCORDANCE
TANK DESIGNED AND CONSTRUCTED BY
STRAND WOUND, PRESTRESSED CONCRETE
3. THE TANK SHALL BE AN AWWA D110, TYPE I,
CRITERIA.
2. SEE DRAWING 99S07 FOR THE TANK DESIGN
DRAWING 00S01.
1. FOR GENERAL STRUCTURAL NOTES, REFER TO
NGB
KP
99S05
66 STRUCTURAL
STORAGE TANK
FOUNDATION PLAN
8660F1099S05.dwgkjackson 8660F10 T 8660F1001S110 FOUNDATION 1/8" = 1'-0" 8'-0"
5°
5° 5° 10°
RIDGE LINE OF QUADRANT
BOUNDARY BELOW (TYP)
SEE CIVIL DRAWINGS FOR
COORDINATE POINT
INTERIOR SST
LADDER W/ FALL
PROTECTION SYSTEM
EXTERIOR ALUM LADDER
SWALE LINE
(TYP ALL AROUND)
16" PW
16" RW
TANK INLET
TANK OUTLET
W
99S07
X
99S07
X
99S07
V
99S07
24"x2'-6" SPOOL PIECE CENTERED
IN WALL WITH (2) 24" BLIND FLG,
MATCH CL OF OVERFLOW
TO BOOSTER PUMP
STATION SEE DWG 99C19
FOR CONTINUATION
4" RW
FOR CONTINUATION
SYSTEM SEE DWG 99C19
FROM DISTRIBUTION
16" OF
RISER
WASHDOWN
24"x2'-6" SPOOL PIECE CENTERED
IN WALL WITH (2) 24" BLIND FLG,
MATCH CL OF OVERFLOW
51°
5.73°
33 .27°
15°
15°
45°
TANK INLET
FLOW
FLOW
Y
99S08
WATER SAMPLING STATION
PRESSURE TRANSMITTER CONNECTIONS
FUTURE CHLORINATOR CONNECTION
16" OF
5 99S08
CAST-IN-PLACE
TYPE I CONCRETE
COREWALL
PER AWWA D110
TANK FOOTING
COLS AS
REQUIRED
SQUARE
FOOTING
(TYP) AS REQUIRED
15'-0"
ASREQUIRED
15'-0"
JKN
REV DATE BY DESCRIPTION
DATE
CHECKED
DRAWN
DESIGNED
8660F.10
JOB NO.
DRAWING NO.
SHEET NO.
SCALES ACCORDINGLY
VERIFY SCALES
THIS SHEET, ADJUST
IF NOT ONE INCH ON
BAR IS ONE INCH ON
ORIGINAL DRAWING
0 1"
APRIL 2023 OF 200
CITY OF UKIAH
RECYCLED WATER PROJECT - PHASE 4
1 2 3 4 5 6 7 8 9 10 11 12 13
AB
CD
E
F
1 2 3 4 5 6 7 8 9 10 11 12 13
AB
CD
E
F
G G
®
PURPOSES.
CONSTRUCTION
IS NOT TO BE USED FOR
2023, CA PE NO. 76832. IT
OF BRIAN W. AVON, APRIL
UNDER THE AUTHORITY
PURPOSE OF BIDDING
RELEASED FOR THE
THIS DOCUMENT IS
CHANGE DURING CONSTRUCTION.
DRAWINGS WILL BE PROVIDED AS A DESIGN
NOT FOR CONSTRUCTION. CONSTRUCTION
THIS DRAWING IS FOR BID PURPOSES ONLY.
PlotDate:3/23/20234:29:43PM
GENERAL NOTES:
CONSTRUCTION.
9. FOR BIDDING PURPOSES, NOT FOR
TANK DESIGNER.
8. FINAL TANK DESIGN TO BE DETERMINED BY THE
S110/TYP.
7. FOR CONSTRUCTION JOINT SEE DETAIL
WITH CLOSED LOOP ALL AROUND JOINTS.
S107/TYP. WATERSTOP SHALL BE CONTINUOUS
6. FOR WATERSTOP SEE DETAILS S106/TYP AND
NOTED OTHERWISE.
316/316L FOR WELDING FABRICATIONS UNLESS
5. ALL STAINLESS STEEL SHALL BE A MINIMUM OF
CABLES, JOINTS, ETC. ARE NOT SHOWN.
STEEL, PRESTRESSING CONNECTIONS, SEISMIC
WATERSTOPS, BEARING PADS, REINFORCING
ASPECTS OF THE TANK, INCLUDING SHOTCRETE
FOR AWWA D110, TYPE I TANK. DETAILED
4. DRAWINGS SHOW THE GENERAL ARRANGEMENT
SPECIFICATION 13207.
WITH THE REQUIREMENTS SET FORTH IN
QUALIFIED TANK CONTRACTOR IN ACCORDANCE
TANK DESIGNED AND CONSTRUCTED BY
STRAND WOUND, PRESTRESSED CONCRETE
3. THE TANK SHALL BE AN AWWA D110, TYPE I,
CRITERIA.
2. SEE DRAWING 99S07 FOR THE TANK DESIGN
DRAWING 00S01.
1. FOR GENERAL STRUCTURAL NOTES, REFER TO
NGB
KP
99S06
67 STRUCTURAL
STORAGE TANK
ROOF PLAN
8660F1099S06.dwgkjackson 8660F10 U 8660F1001S110 ROOF1/8" = 1'-0"
ALUM ROOF VENT
4'x8' DOUBLE LEAF
ALUM ACCESS HATCH
EXTERIOR ALUM LADDER W/
"SAF-T-CLIMB" LADDER SYSTEM
& CLIMBING DEVICE OR EQUAL
PROVIDE HORIZONTAL LIFELINE
FALL PROTECTION SYSTEM W/
CABLE & ANCHOR POINTS AS
REQD, SEE NOTE 5 (TYP)
ROOF DRAIN SCUPPER W/
GALV STEEL PIPE (TYP 10
PLACES EQUALLY SPACED)
W
99S07
V
99S07
AS REQUIRED
ASREQUIORED
TANK WALL
ROOF SLAB
JKN