RIVERSIDE PARK REGENERATION 68 Spec No.24-05
REFLECTING ADDENDUM 3
Normal progress inspection shall be requested by the Contractor from the Engineer at least seven (7) working days in advance of an anticipated inspection. Inspections shall be at the commencement and completion of the maintenance period.

All conditions noted in Landscape Planting section shall apply herein. 20-4.02 MATERIALS
All materials used shall either conform to Landscape Planting specifications in other sections or shall otherwise be acceptable to the Engineer. The Engineer shall be given monthly record of all herbicides, insecticides, and disease control chemicals used. 20-4.02A Maintenance Fertilizer
Commercial grade complete fertilizer of neutral character, consisting of fast and slow release nitrogen.

Uniform "beaded” homogeneous mixture, 100% passing through #4 mesh screen, composition suitable for application with approved equipment and shall contain the following minimum available percentages by weight of plant food. Chemical analysis shall include 50% Humus, 15% Humic Acids, 1% Soluble Metalic Iron, and soil bacteria.

Nitrogen 5% minimum
Phosphoric acid 3% minimum
Potash 1% minimum
20-4.02B Controlled Release Fertilizer
Commercial grade complete fertilizer of neutral character, consisting of fast and slow release nitrogen.

Uniform "beaded” homogeneous mixture, 100% passing through #4 mesh screen, composition suitable for application with approved equipment and shall contain the following minimum available percentages by weight of plant food. Chemical analysis shall include 25% Humus, 5% Humic Acids, and 2% Iron Nitrogen 12% minimum
Phosphoric acid 8% minimum
Potash 8% minimum
20-4.02C Irrigation
Provide replacement irrigation parts per irrigation plans as necessary. 20-4.03 CONSTRUCTION
20-4.03A Maintenance
All areas shall be kept free of debris and all planted areas shall be weeded and cultivated at intervals of not more than ten (10) days. Watering, mowing, rolling, edging, trimming, fertilization, spraying, and pest control, as may be required, shall be included in the Maintenance Period.

The Contractor shall be responsible for maintaining adequate protection of the planting areas. Damaged areas shall be repaired at the Contractor’s expense.
20-4.03B Shrub and Groundcover Care
20-4.03B(1) Watering
Ensure proper irrigation system operation. If required for supplemental watering, provide and maintain a large enough water basin around plants so that enough water can be applied to establish moisture through the major root zone. When hand watering, use a water wand to break the water force. Use mulches to reduce evaporation and frequency of watering.
20-4.03B(2) Weed Control

Page 620 of 1534 ends

RIVERSIDE PARK REGENERATION 69 Spec No.24-05
REFLECTING ADDENDUM 3
Keep basins and areas between plants free of weeds using hand and tool methods. Avoid frequent soil cultivation that destroys shallow roots. Use mulches to help prevent weed seed germination. Non-toxic treatments such as white vinegar may be used to control weeds in cracks. Use recommended legally approved herbicides only with written approval of the Engineer. Use of herbicides is discouraged in accordance with Alameda County Bay Friendly guidelines. 20-4.03B(3) Insect and Disease Control
Apply non-toxic insecticidal soaps and other natural treatments. Refer to the Alameda County Bay Friendly guidelines for appropriate treatments. If infestation persists, maintain a reasonable control with insecticides after receipt of written approval by Engineer.
20-4.03B(4) Fertilization
Fertilize all planting areas with the following: At the end of the maintenance period: 20 lbs. per 1,000 sf. of controlled release top-dress fertilizer.

Avoid applying fertilizer to the root ball and base of main stem; rather, spread evenly under plant to drip line.

Replacement of Plants: Replace dead, dying, and missing plants with plants of a size, condition, and variety acceptable to Engineer at Contractor’s expense.
20-4.03C Tree Care
20-4.03C(1) Watering
Ensure proper irrigation system operation. If required for supplemental watering, provide and maintain a 3 foot diameter or larger water basin around trees so that enough water can be applied to establish moisture through the major root zone. When hand watering, use a water wand to break the water force. Use mulches to reduce evaporation and frequency of watering. 20-4.03C(2) Weed Control
Keep basins and areas below tree free of weeds using hand and tool methods. Avoid frequent soil cultivation that destroys shallow roots. Use mulches to help prevent weed seed germination. Use recommended legally approved herbicides only with written approval of the Engineer. Use of herbicides is discouraged in accordance with Alameda County Bay Friendly guidelines. 20-4.03C(3) Insect and Disease Control
Apply non-toxic insecticidal soaps and other natural treatments. Refer to the Alameda County Bay Friendly guidelines for appropriate treatments. If infestation persists, maintain a reasonable control with insecticides after receipt of written approval by Engineer.
20-4.03C(4) Fertilizing
Fertilize as specified under Shrub care.
20-4.03C(5) Pruning
Pruning shall be performed only under the supervision of a certified arborist. The following on-line information is useful: http://www.urbantree.org/index.html 20-4.03C(6) Maintenance Every Three Months
Inspect for and remedy any wear on trunk and branches against stakes, tree grate, or other item near tree.

Inspect tree tubes.

Check irrigation to each plant for clogging, flooding, erosion, breakage, or other harmful conditions.

Page 621 of 1534 ends

RIVERSIDE PARK REGENERATION 70 Spec No.24-05
REFLECTING ADDENDUM 3
During fall and winter seasons, provide selective pruning of trees under the direction of a certified arborist to eliminate poor branching structure, broken branch stubs, and branches below six feet that conflict with vehicular/pedestrian access and visibility. Do not prune leaders. 20-4.03D Final Acceptance of the Project
Prior to the date of the Final Inspection, the Contractor shall acquire from the Engineer approved, reproducible prints and final record from the job record set of all changes made to the all plans during construction, label said prints “As-Builts”, and deliver to the Engineer and as required to any Local Agency.

Prior to the date of Final Inspection, the Contractor shall deliver to the Engineer the “Landscape and Irrigation Guarantee” as required. Said guarantee shall be on the Contractor’s letterhead and dated the final acceptance date.

All turn-over items noted in other specification sections shall be delivered prior to a Final Inspection. 20-4.04 PAYMENT
Not used.

Basalt Chip must be:

Type: To be selected by Engineer. Bid shall include “Basalt Crusher Dust” or similar.

Size: 1/4” minus
Color: Gray, uniform color
Shall be from only 1 source.

Replace the first sentence of section 20-5.03C(3) with:

Apply 4” depth of Basalt Chip to entire area indicted for Gravel Mulch and compact it in equal lifts by rolling.

Replace sections 20-5.04B(2) through 20-5.04B(4) with:
20-5.04B(2) Organic Mulch
Organic Mulch shall be well composted. Suitable as a top dressing of trees, shrubs and groundcovers:

Provided by City
^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^
21 EROSION CONTROL
Add to section 21-2.02G:

Fertilizer shall have a guaranteed chemical analysis of 10 percent nitrogen, 10 percent phosphoric acid and 10 percent water soluble potash.

Add to section 21-2.03A:

Remove sediment deposits from inside of existing storm drains and culverts shown on the Plans. ^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^

DIVISION IV SUBBASES AND BASES
23 GENERAL

DIVISION VI STRUCTURES
45 GENERAL
No Changes

Page 622 of 1534 ends

RIVERSIDE PARK REGENERATION 71 Spec No.24-05
REFLECTING ADDENDUM 3
60 EXISTING STRUCTURES
No Changes
^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^

DIVISION VII DRAINAGE
61 GENERAL
No Changes
^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^
67 STRUCTURAL PLATE CULVERTS
No Changes
^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^
71 EXISTING DRAINAGE FACILITIES
No Changes
^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^

DIVISION VIII MISCELLANEOUS CONSTRUCTION
72 SLOPE PROTECTION
No Changes.
77-2 WATER DISTRIBUTION SYSTEM
+
77-2.03J Construction Water
All water required for the performance of work shall be legally obtained and furnished by the Contractor.

Construction water for the work under this contract will not be furnished by the City.

Construction water shall be obtained from the City water system only at the point(s) designated by the Engineer. Contractors are prohibited from operating gate valves or fire hydrants on the City system.

At no time shall water trucks or any other unapproved vessel be used in the application of loading water mains unless first approved of by the City.

Prior to obtaining water from the City's water system the Contractor shall obtain a Water Use Permit and rent a hydrant. This can be done by contacting the Public Works Department. The Contractor is responsible for any deposits required, permits and moving fees, and the cost of all water used. Deposits shall be refunded upon removal of the meter by City forces, less any charges for water used. Any damage to the meter may result in forfeiture of all or part of the deposit.

Unmetered connections are not permitted to the City of Ukiah water system. Such connections shall be severed by the Water Department and will result in penalties including payment of fines and estimated water usage fees.

Use of water obtained from unmetered fire hydrants or other facilities is a violation of City ordinance and State law. Use of construction water from sources other than the City Water System must be approved by Engineer.

Citations and fines will be levied for violation of these and other utility regulations and deductions will be made from progress payments if necessary.

Page 623 of 1534 ends

RIVERSIDE PARK REGENERATION 72 Spec No.24-05
REFLECTING ADDENDUM 3
77-2.01K Payment
Refer to Section 9
^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^
78 INCIDENTAL CONSTRUCTION
Add to section 78-2.01:

Survey monument adjustments shall conform to the provisions in Section 78-2, “Survey Monuments,” of the Standard Specifications, and these Construction Details. This item of work shall consist of resetting cast-inplace Portland cement concrete survey monument at the location shown on the Plans, as directed by the Engineer, and these Construction Details.

The survey marker disk for the survey monument will be furnished by the City at the site of the project. The exact location of the monuments will be established by the Engineer and upon completion, the monuments will be checked and the center point stamped by the Engineer.

Waste materials generated by resetting survey monuments shall be disposed of in accordance with the requirements of Section 14-10, “Solid Waste Disposal and Recycling,” of the Standard Specifications.

The concrete portion of monuments shall be constructed in accordance with the provisions in Section 51, “Concrete Structures,” and Section 90, “Portland Cement Concrete.” Concrete shall be minor concrete. A oneinch maximum aggregate shall be used.

Any monuments which will or may be disturbed by construction activities or are replaced as part of the project must be tied out and corner record filed prior to construction. The Contractor will not be required to file corner records. The Contractor MUST receive clearance from the Engineer in writing prior to disturbing any monument.

All work associated with resetting survey monuments is the responsibility of the Contractor, including any costs associated with the work.

DIVISION IX TRAFFIC CONTROL FACILITIES
81 MISCELLANEOUS TRAFFIC CONTROL DEVICES
No Changes
^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^

DIVISION X ELECTRICAL WORK
86 GENERAL

DIVISION XI MATERIALS
89 AGGREGATE
No Changes

DIVISION XII BUILDING CONSTRUCTION
99 BUILDING CONSTRUCTION
No Changes

Page 624 of 1534 ends

RIVERSIDE PARK REGENERATION 73 Spec No.24-05
REFLECTING ADDENDUM 3
SECTION 14. EXCLUSIONS FROM GENERAL CONDITIONS
14-01. Provisions to be Excluded from General Conditions. The following designated provisions of the General Conditions are hereby determined to be inapplicable to the proposed work and, therefore, are hereby excluded from the terms of the Notice to Bidders, Proposal, Agreement and other contract documents as though entirely omitted from said General Conditions:
(1) Section 6-02. Office at the Site
(2) Section 7-03. Surveys
No other exclusions.

SECTION 15. AMENDMENTS TO GENERAL CONDITIONS
15-01. Sections of General Conditions to be Amended.

The following sections of the Technical Specifications are included in the Contract documents Section 02100 Demolition
Section 02230 Site Clearing
Section 02260 Landscape Grading
Section 02300 Earthworks
Section 02315 Wetland Grading
Section 02811 Irrigation
Section 02905-Landscape Installation
Section 02950.10 Hydroseed
Section 02970 - Landscape Maintenance

Page 625 of 1534 ends

RIVERSIDE PARK REGENERATION 74 Spec No.24-05
REFLECTING ADDENDUM 3

BID SUBMITTAL CHECKLIST
The following is a checklist to assist you in your submission of your bid documents. Please make sure you include the following when submitting your bid documents to reduce the risk of having your bid rejected:

Did you include?...
o Proposal (Page 75)
 Unit prices filled out clearly.
 Extended prices filled out clearly and calculated correctly  Total bid amount filled out clearly and calculated correctly  Sign the proposal, and provide complete information
 CLSB No. and expiration date
 Department of Industrial Relations Public Works Contractor Registration Number o Fair Employment Practices Certification (Page 80)
 Filled out completely per instruction
o Worker’s Compensation Certificate (Page 81)
 Filled out completely per instruction
o Certification of Non-Discrimination in Employment (Page 82)  Filled out completely per instruction
o List of Proposed Subcontractors (Page 83)
 Filled out completely per instruction
o Statement of Experience (Page 84)
o Signature of Bidder (Page 85)
 Filled out completely per instruction
 Authorized signature provided
o Bidder’s Bond (Page 86)
 Filled out completely per instruction
o Non-Collusion Affidavit (Page 87)
 Filled out completely per instruction
 Notarized
o Addenda Issued
 Check the City website for any addenda issued: www.cityofukiah.com/purchasing Please note that actual acknowledgment of addenda is not required to submit with your bid. Refer to Section 1-11 and 3-07 of the General Conditions.

Page 626 of 1534 ends

RIVERSIDE PARK REGENERATION 75 Spec No.24-05
REFLECTING ADDENDUM 3

CITY OF UKIAH

MENDOCINO COUNTY, CALIFORNIA

PROPOSAL
FOR

RIVERSIDE PARK REGENERATIONRIVERSIDE PARK REGENERATION
Specification No. 24-05
The undersigned, as bidder,
declares that he or she has examined thoroughly all of the contract documents herein contained, that this proposal is made without collusion with any other person, firm or corporation and that all laws and ordinances relating to the interest of public officers in this contract have been complied with in every respect.

AND he or she proposes and agrees, if this proposal is accepted, 1) that he or she will contract with the City of Ukiah, Mendocino County, California, in the form of the copy of the agreement herein contained
a) to provide all necessary machinery, tools, apparatus and other means of construction; b) to furnish all materials;
c) to provide all superintendence, overhead expenses and all labor and expenses of whatever nature necessary to complete the job in conformity with the specifications and drawings and other contract provisions herein or reasonably implied hereby or as necessary to complete the work in the manner and within the time named herein and according to the requirements and to the reasonable satisfaction of the City Engineer; d) to pay all charges of freight transportation and hauling; 2) that he or she indemnifies the City against any loss or damage arising from any act of the undersigned as Contractor; and
3) that he or she will accept as full payment therefor the following sums:

Page 627 of 1534 ends

RIVERSIDE PARK REGENERATION 76 Spec No.24-05
REFLECTING ADDENDUM 3

BIDDING SCHEDULE
In the case of any discrepancy between the unit price and the total set forth for the item, the unit price shall prevail; provided, however, that if the amount set forth as a unit price is ambiguous, unintelligible or uncertain for any reason, or is omitted, or in the case of lump sum items, is not the same amount as the entry in the “Total” column, then the amount set forth in the “Total” column for the item shall prevail in accordance with the following:

1. As to lump sum items, the amount set forth in the “Total” column shall be the unit price;

2. As to unit basis items, the amount set forth in the “Total” column shall be divided by the estimated quantity for the item and the price thus obtained shall be the unit price.

The Total Base Bid shall be the sum of the items in the “Total” column. In case of discrepancy between the sum of the items in the “Total” column and the amount entered as Total Base Bid, the sum of the “Total” column items shall prevail. The bid comparison will be based on the sum of the items in the “total” column for each bidder.

The Unit prices for the various Construction Items below include all costs associated with the General Conditions, Special Provisions, Requirements of the Construction Contract, and represent the total, complete, in-place cost for each specific Construction Item in accordance with the Construction Documents, including all elements, work components, accessories, and connections, shown in applicable details or required to yield a complete, sound and functional component or system appropriate for its intended function, whether or not such is specifically described or listed in any description of measurement or payment. The total amount of the Construction items below shall represent the total and complete cost of the fully functional Project. All work not specifically listed below be required to complete the work of the various construction items and the cost of such shall be considered as included throughout the various unit prices indicated.

Lowest bid will be based on the lowest Base Bid, not including the add alternate bid item.

Page 628 of 1534 ends

RIVERSIDE PARK REGENERATION 77 Spec No.24-05
REFLECTING ADDENDUM 3
NAME OF BIDDER:

SPEC #: 24-05
PROJECT NAME: RIVERSIDE PARK REGENERATION

BASE BID
Item # Description Unit of
Measure Quantity Unit Price Total
1 Mobilization, Demobilization, and Final
Cleanup
LS 1 $__________ $_____________
2 Storm Water Pollution Prevention Plan
(SWPPP)
LS 1 $__________ $_____________
3 Storm Water Sampling and Analysis Day EA 1 $__________ $_____________ 4 Temporary Water Pollution Control
Measures
LS 1 $__________ $_____________
5 Progress Schedule (Critical Path
Method)
LS 1 $__________ $_____________
6 Construction Area Signs LS 1 $__________ $_____________ 7 Construction Survey LS 1 $__________ $_____________
8 Remove Debris Material CY 18,200 $__________ $_____________ 9 Clearing and Grubbing LS 1 $__________ $_____________ 10 Remove Tree and Stump EA 3 $__________ $_____________ 11 Soil Export (Contaminated Soil) LS 1 $__________ $_____________ 12 Tree Protection LS 1 $__________ $_____________
13 Grading CY 25,000 $__________ $_____________
14 Bentonite CY 552 $__________ $_____________

Page 629 of 1534 ends

RIVERSIDE PARK REGENERATION 78 Spec No.24-05
REFLECTING ADDENDUM 3
15 Soil Amendment Placement SF 249,480 $__________ $_____________ 16 Basalt Chip CY 28 $__________ $_____________
17 Planting EA 1 $__________ $_____________
18 Hydroseed (seed is owner provided,
contractor to pick up seed in Colusa, CA)
SF 255,262 $__________ $_____________
19 Irrigation Allowance LS 1 $30,000 $30,000
20 Plant Establishment LS 1 $__________ $_____________
TOTAL BASE BID $____________________________

BID ALTERNATES
TOTAL BID: Items 1 through A1 inclusive: $______________________________ We, the undersigned, acknowledge that the City Council has reserved the right to reject any or all bids and to determine which proposal is, in its opinion, the lowest responsive bid from a responsible bidder and that which it deems in the best interest of the City to accept. We, the undersigned, further agree, if this proposal shall be accepted, to sign the agreement and to furnish the required bonds with satisfactory surety, or sureties, within fifteen (15) calendar days after written notice that the contract is ready for signature; and, if the undersigned shall fail to contract, as aforesaid, it shall be understood that he or she has abandoned the contract and that, therefore, this proposal shall be null and void and the proposal guaranty accompanying this proposal, or the amount of said guaranty, shall be forfeited to and become the property of the City. Otherwise, the proposal guaranty accompanying this proposal shall be returned to the undersigned.

Witness our hands this day of ___________________, 20____.

Item # Description Unit of
Measure Quantity Unit Price Total
A1 Boulder Placement EA 9 $__________ $_____________
A2 Planting EA 1 $__________ $_____________
TOTAL ALTERNATE BID $____________________________

Page 630 of 1534 ends

RIVERSIDE PARK REGENERATION 79 Spec No.24-05
REFLECTING ADDENDUM 3
Licensed in accordance with an act providing for the registration of California Contractors License No. ______________, expiration date ________________.

THE CONTRACTOR'S LICENSE NUMBER AND EXPIRATION DATE STATED HEREIN ARE MADE UNDER PENALTY OF PERJURY.

Department of Industrial Relations Public Works Contractor Registration Number:_____________________ Signature of bidder or bidders, with business name, address, phone number and fax number:
_________________________________________________________________ _________________________________________________________________ _________________________________________________________________ _________________________________________________________________ Notice: In the case of a corporation, give below the addresses of the principal office thereof and names and addresses of the President, Secretary, Treasurer.
_________________________________________________________________ _________________________________________________________________ _________________________________________________________________

Page 631 of 1534 ends

RIVERSIDE PARK REGENERATION 80 Spec No.24-05
REFLECTING ADDENDUM 3

FAIR EMPLOYMENT PRACTICES CERTIFICATION
TO:_____________________________________________________________ ________________________________________________________________ The undersigned, in submitting a bid for performing the following work by Contract, hereby certifies that he or she has or will meet the standards of affirmative compliance with the Fair Employment Practices requirements of the Special Provisions contained herein.

RIVERSIDE PARK REGENERATION
________________________________________________________________ (Signature of Bidder)
Business Mailing Address:
_________________________________________________
_________________________________________________
_________________________________________________
Business Location:
_________________________________________________
_________________________________________________
(The bidder shall execute the certification of this page prior to submitting his or her proposal.)

Page 632 of 1534 ends

RIVERSIDE PARK REGENERATION 81 Spec No.24-05
REFLECTING ADDENDUM 3

WORKER'S COMPENSATION CERTIFICATE
I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for Worker's Compensation or undertake self-insurance in accordance with the provisions of that code and I will comply with such provisions before commencing the performance of the work of this contract.

Witness my hand this________ day of _______________, 200____ Signature of Bidder, with Business Address:
__________________________________________________
__________________________________________________
__________________________________________________
__________________________________________________

Page 633 of 1534 ends

RIVERSIDE PARK REGENERATION 82 Spec No.24-05
REFLECTING ADDENDUM 3

CERTIFICATION OF NONDISCRIMINATION IN EMPLOYMENT
The bidder represents that he or she has/has not, participated in a previous contract or subcontract subject to either the equal opportunity clause herein or the clause contained in Section 301 of Executive Order 10925; that he or she has/has not, filed all required compliance reports; and that representations indicating submission of required compliance prior to subcontract awards.

Signature and address of Bidder:
__________________________________________________ Date_____________ __________________________________________________
__________________________________________________
__________________________________________________
(This certification shall be executed by the bidder in accordance with Section 60-1.6 of the Regulations of the President's Committee on Equal Employment Opportunity for implementing Executive Orders 10925 and 11114.)

Page 634 of 1534 ends

RIVERSIDE PARK REGENERATION 83 Spec No.24-05
REFLECTING ADDENDUM 3

LIST OF PROPOSED SUBCONTRACTORS
In compliance with the provisions of Sections 4100-4108 of the California Public Contract Code and any amendments thereof, each bidder shall set forth (a) the name and location of the place of business of each subcontractor who will perform work or labor or render service in or about the construction site or a subcontractor licensed by the State of California who, under subcontract to the prime contractor, specially fabricates and installs a portion of the work or improvement according to detailed drawings contained in the plans and specifications in an amount in excess of one-half of 1 percent of the total bid and (b) the California Contractor License Number for each subcontractor, and (c) the portion of the work to be done by each subcontractor.(See General Conditions Section 1-09.) Include with the name of each sub-contractor their Department of Industrial Relations Public Works Contractor Registration Number.

SUBCONTRACTOR
NAME

SUBCONTRACTOR

LICENSE NUMBER

SUBCONTRACTOR

DIR REGISTRATION
NUMBER

SUBCONTRACTOR

BUSINESS

ADDRESS

DESCRIPTION

OF WORK

Page 635 of 1534 ends

RIVERSIDE PARK REGENERATION 84 Spec No.24-05
REFLECTING ADDENDUM 3

STATEMENT OF EXPERIENCE OF BIDDER
The bidder is required to state below what work of similar magnitude or character he or she has done and to give references that will enable the City Council to judge of his or her experience, skill and business standing and his or her ability to conduct work as completely and rapidly as required under the terms of the contract. ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________

Page 636 of 1534 ends

RIVERSIDE PARK REGENERATION 85 Spec No.24-05
REFLECTING ADDENDUM 3

SIGNATURE(S) OF BIDDER
Accompanying this proposal is ___________________________________ (insert the words "cash ($)", "cashier's check" or "bidder's bond", as the case may be) in an amount equal to at least 10 percent of the bid.

The names of all persons interested in the foregoing proposal as principals are as follows:

IMPORTANT NOTICE: If bidder or other interested person is a corporation, provide the legal name of corporation and also the names of the president, secretary, treasurer and manager thereof. If a co-partnership, provide the true name of firm and also the names of all individual co-partners composing the firm. If bidder or other interested person is an individual, provide the first and last names in full. _________________________________________________________________ _________________________________________________________________ _________________________________________________________________ Licensed in accordance with an act providing for the registration of Contractors:

License No. ______________________________, License Expiration Date .

Signature(s) of Bidder: ______________________________________________ ______________________________________________
______________________________________________
NOTE: If bidder is a corporation, the legal name of the corporation shall be set forth above together with the signature of the officer or officers authorized to sign contracts on behalf of the corporation; if bidder is a co-partnership, the true name of the firm shall be set forth above together with the signature of the partner or partners authorized to sign contracts in behalf of the co-partnership; and if bidder is an individual, his or her signature shall be placed above. If a member of a partnership, a Power of Attorney must be on file with the Department prior to opening bids or submitted with the bid; otherwise, the bid will be disregarded as irregular and unauthorized.

Business address: ___________________________________________________ ___________________________________________________
Place of residence: ___________________________________________________ ___________________________________________________
Dated: __________________

Page 637 of 1534 ends

RIVERSIDE PARK REGENERATION 86 Spec No.24-05
REFLECTING ADDENDUM 3

CITY OF UKIAH
Mendocino County, California

BIDDER'S BOND

KNOW ALL MEN BY THESE PRESENTS,
That we, ______________________________________________________________ ________________________________________________________________, as PRINCIPAL and ________________________________________________________________ ________________________________________________________________, as SURETY, are held and firmly bound unto the City of Ukiah in the penal sum of 10 PERCENT OF THE TOTAL AMOUNT OF THE BID of the Principal above named, submitted by said Principal to the City of Ukiah, as the case may be, for the work described below, for the payment of which sum in lawful money of the United States, well and truly to be made, to the City Clerk to which said bid was submitted, we bind ourselves, our heirs, executors, administrators and successors jointly and severally, firmly by these presents. In no case shall the liability of the surety hereunder exceed the sum of $____________________

THE CONDITION OF THIS OBLIGATION IS SUCH,
That whereas the Principal has submitted the above mentioned bid to the City of Ukiah, as aforesaid, for certain construction specifically described as follows, for which bids are to be opened at the Office of the City Clerk, Ukiah Civic Center, Ukiah, California, on July 15, 2024 for RIVERSIDE PARK REGENERATION NOW, THEREFORE, If the aforesaid Principal is awarded the contract and, within the time and manner required under the specifications, after the prescribed forms are presented to him or her for signatures, enters into a written contract, in the prescribed form, in accordance with the bid and files two bonds with the City of Ukiah, one to guarantee faithful performance and the other to guarantee payment for labor and materials, as required by law, then this obligation shall be null and void; otherwise, it shall be and remain in full force and virtue.

IN WITNESS WHEREOF, we have hereunto set our hands and seals on this ______ day of ________________, A.D. 20_____.
__________________________________________________(Seal) __________________________________________________(Seal) __________________________________________________(Seal) Principal
__________________________________________________(Seal) __________________________________________________(Seal) __________________________________________________(Seal) Surety
Address: __________________________________________________________ __________________________________________________________ __________________________________________________________

Page 638 of 1534 ends

RIVERSIDE PARK REGENERATION 87 Spec No.24-05
REFLECTING ADDENDUM 3

NON-COLLUSION AFFIDAVIT
Note: Bidder shall execute the affidavit on this page prior to submitting his or her bid.

To City Council, City of Ukiah:

The undersigned in submitting a bid for performing RIVERSIDE PARK REGENERATION by contract, being duly sworn, deposes and says:
that he or she has not, either directly or indirectly, entered into any agreement, participated in any collusion, or otherwise taken any action in restraint of free competitive bidding in connection with such contract.
__________________________________________________
__________________________________________________
__________________________________________________
Signature(s) of Bidder
Business Address:__________________________________________________ __________________________________________________
__________________________________________________
Place of Residence:__________________________________________________ __________________________________________________
__________________________________________________

NOTARIZATION
Subscribed and sworn to before me this ______ day of _________, 20____. __________________________________________________
Notary Public in and for the County of______________________________, State of California.

My Commission Expires ________________________, 20 ____.

Page 639 of 1534 ends

RIVERSIDE PARK REGENERATION 88 Spec No.24-05
REFLECTING ADDENDUM 3

CITY OF UKIAH
Mendocino County, California

AGREEMENT
FOR

RIVERSIDE PARK REGENRATION
Specification No.24-05
THIS AGREEMENT, made this ______ day of ___________________, 20____, by and between the City of Ukiah, Mendocino County, California, hereinafter called the City and _______________________ hereinafter called the Contractor,
WITNESSETH:

WHEREAS, the City has caused to be prepared in accordance with law, specifications, drawings and other contract documents for the work herein described and shown and has approved and adopted these contract documents, specifications and drawings and has caused to be published in the manner and for the time required by law a notice to bidders inviting sealed proposals for doing the work in accordance with the terms of this contract and
WHEREAS, the Contractor, in response to the notice to bidders, has submitted to the City a sealed proposal accompanied by a proposal guaranty in an amount of not less than 10 percent of the bid price for the construction of the proposed work in accordance with the terms of this contract and WHEREAS, the City, in the manner prescribed by law, has publicly opened, examined and canvassed the proposals submitted and as a result has determined and declared the Contractor to be the lowest and best regular responsible bidder for the work and for the sums named in the proposal, NOW, THEREFORE, THIS AGREEMENT WITNESSETH:

Article 1. Work to be Done and Contract Days Allowed.

That the Contractor shall provide all necessary machinery, tools, apparatus and other means of construction; shall furnish all materials, superintendence, overhead, expenses, all labor and expenses of whatever nature necessary for completion of the work in conformity with the Special Provisions and other contract documents hereto attached and according to such instructions as may be given by the Engineer. The Contractor shall complete the work within 180 WORKING days. Contract days shall be counted starting with the 10th day following receipt of notice that the contract has been executed by the City. Contractor, at his or her option, may begin work prior to start of counting contract days, however, in no event shall the Contractor start work without giving notification to the Engineer at least 72 hours prior to the start of work, without obtaining an encroachment permit from the City, or without having submitted certificates of insurance that have been accepted and approved by the Engineer.

Article II. Contract Prices.

That the City shall pay the Contractor the prices stated in the proposal submitted by the Contractor, for complete performance of the contract by the Contractor. The Contractor hereby agrees to accept the prices as full compensation for all material and appliances necessary to the work, for all labor and use of tools and other implements necessary to execute the work contemplated in this contract; for all loss or damage arising out of

Page 640 of 1534 ends

RIVERSIDE PARK REGENERATION 89 Spec No.24-05
REFLECTING ADDENDUM 3
the nature of the work or from the action of the elements, or from any unforeseen obstructions or difficulties which may be encountered in the prosecution of the work; for all risks of every description connected therewith; for all expenses of the work, as herein specified; for all liability and other insurance, for all overhead and other expenses incident to the work; all according to the Contract Drawings, the Special Provisions, the Details, the instructions and the requirements of the City.

Article III. Labor Discrimination.

Attention is directed to Section 1735 of the Labor Code, which reads as follows:
"No discrimination shall be made in the employment of persons upon public works because of the race, color, national origin or ancestry, or religion of such persons and every contractor for public works violating this section is subject to all the penalties imposed for a violation of this chapter." In connection with the performance of work under this contract, the Contractor agrees as follows:
(a) The Contractor will not willfully discriminate against any employee or an applicant for employment because of race, color, religion, ancestry, or national origin. The Contractor will take affirmative action to ensure that applicants are employed and that employees are treated during employment without regard to their race, color, religion, ancestry, or national origin. Such action shall include, but not be limited to, the following: employment, upgrading, demotion or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship. The Contractor agrees to post in conspicuous places, available to employees and applicants for employment, notices to be provided by the awarding authority setting forth the provisions of this Fair Employment Practice section. (b) The Contractor will send to each labor union or representative of workers with which he or she has a collective bargaining agreement or other contract or understanding, a notice, to be provided by the awarding authority, advising the said labor union or worker's representative of the Contractor's commitments under this section, to employees and applicants for employment. (c) The Contractor will permit access to his or her records of employment, employment advertisements, application forms and other pertinent data and records by the Fair Employment Practices Commission, City of Ukiah or any other appropriate agency of the State of California designated by the awarding authority, for the purposes of investigation to ascertain compliance with the Fair Employment Practices section of this contract. (d) A finding of willful violation of the Fair Employment Practices section of this Contract or of the Fair Employment Practices Act shall be regarded by the awarding authority as a basis for determining the Contractor to be not a "responsible bidder" as to future contracts for which such Contractor may submit bids, for revoking the Contractor's pre-qualification rating, if any and for refusing to establish, reestablish or renew a pre-qualification rating for the Contractor.

The City of Ukiah shall deem a finding of willful receipt of written notice from the Fair Employment Practices Act to have occurred upon that it has investigated and determined that the Contractor has violated the Fair Employment Practices Act and has issued an order under Labor Code Section 1426 or obtained an injunction under Labor Code Section 1429.

Upon receipt of such written notice from the Fair Employment Practices Commission, the City shall notify the Contractor that unless he or she demonstrates to the satisfaction of the awarding authority within a stated period that the violation has been corrected, his or her pre-qualification rating will be revoked at the expiration of such period. (e) The Contractor agrees that should the City determine that the Contractor has not complied with the Fair Employment Practices section of this Contract, then pursuant to Labor Code Section 1735 and 1775 the Contractor shall, as a penalty to the City, forfeit for each calendar day or portion thereof,

Page 641 of 1534 ends

RIVERSIDE PARK REGENERATION 90 Spec No.24-05
REFLECTING ADDENDUM 3
for each person who was denied employment as a result of such non-compliance, the penalties provided in the Labor Code for violation of prevailing wage rates. Such monies may be recovered from the Contractor. The City may deduct any such damages from any monies due the Contractor. (f) Nothing contained in this Fair Employment Practices section shall be construed in any manner of fashion so as to prevent the City or the State of California from pursuing any other remedies that may be available at law.
(g) Prior to awarding the Contract, the Contractor shall certify to the awarding authority that he or she has or will meet the following standards for affirmative compliance, which shall be evaluated in each case by the awarding authority:
(1) The Contractor shall provide evidence, as required by the City that he or she has notified all supervisors, foremen and other personnel officers in writing of the content of the anti-discrimination clause and their responsibilities under it.
(2) The Contractor shall provide evidence, as required by the City, that he or she has notified all sources of employees’ referrals (including unions, employment agencies, advertisements, Department of Employment) of the content of the anti-discrimination clause. (3) The Contractor shall file a basic compliance report, as required by the City. Willfully false statements made in such reports shall be punishable as provided by law. The compliance report shall also spell out the sources of the work force and who has the responsibility for determining whom to hire, or whether or not to hire.
(4) Personally, or through his or her representatives, the Contractor shall, through negotiations with the unions with whom he or she has agreements, attempt to develop an agreement which will:
a. Spell out responsibilities for nondiscrimination in hiring, referral, upgrading and training. b. Otherwise implement an affirmative anti-discrimination program in terms of the unions' specific areas of skill and geography to the end that qualified minority workers will be available and given and equal opportunity for employment.
(5) The Contractor shall notify the City of opposition to the anti-discrimination clause by individuals, firms or organizations during the period of its pre-qualification. (h) The Contractor will include the provisions of the foregoing paragraphs 1 through 5 in every first tier subcontract so that such provisions will be binding upon each such subcontractor. (i) The "Fair Employment Practices Certification" must be completed and signed prior to the time of submitting the bid.

Article IV. Parts of the Contract.

That the complete contract consists of the following documents, all of which shall be considered a part of this agreement.

1. Notice to Bidders

2. Wage Rates

3. General Conditions

4. Technical Specifications

5. Proposal

6. Fair Employment Practices Certification

7. Agreement

Page 642 of 1534 ends

RIVERSIDE PARK REGENERATION 91 Spec No.24-05
REFLECTING ADDENDUM 3

8. Contract Bonds

9. Contract Drawings and Construction Details

10. Standard Drawings

11. Indemnification Agreement
IN WITNESS WHEREOF, this contract being executed in duplicate and the parties having caused their names to be signed by authority of their duly authorized office this _____ day of _____________, 20____.

CITY OF UKIAH, MENDOCINO COUNTY, CALIFORNIA
By: ______________________________________________________________

CITY MANAGER, CITY OF UKIAH
Attest: ______________________________________________________________

CITY CLERK, CITY OF UKIAH
By: ______________________________________________________________

CONTRACTOR
Attest: ______________________________________________________________ Title: ______________________________________________________________ The foregoing contract is approved as to form and legality this ______ day of ______________, 20 ____. __________________________________________________

CITY ATTORNEY, CITY OF UKIAH

Page 643 of 1534 ends

RIVERSIDE PARK REGENERATION 92 Spec No.24-05
REFLECTING ADDENDUM 3

INDEMNIFICATION AGREEMENT
This Indemnification Agreement is made and entered in Ukiah, California, on _________________, 20____, by and between the City of Ukiah (Ukiah) and ______________________________________ (Contractor).

Contractor is
_________________________________________________________________________________ ___________________________________________ for Ukiah.

As a condition of issuing the work order, attached hereto, Ukiah requires assurance that Contractor will protect Ukiah from damage or damage claims which arise from its performance of the work.

Accordingly, Contractor agrees as follows:

1. Indemnification. Contractor shall indemnify and hold harmless Ukiah and its officers, agents, and employees from and against any claim, loss, or damage, including the legal and other costs of defending against any claim of damage or loss which arises out of the Contractor’s negligent or wrongful performance under the work order attached hereto, except for claims, losses, or damages resulting from the sole and exclusive negligence or other wrongful conduct of Ukiah or its officers, agents and employees.

CONTRACTOR
BY: _______________________________________________
TITLE: _______________________________________________

Page 644 of 1534 ends

RIVERSIDE PARK REGENERATION 93 Spec No.24-05
REFLECTING ADDENDUM 3

CITY OF UKIAH
Mendocino County, California

PERFORMANCE BOND
BOND No._____________________
KNOW ALL PERSONS BY THESE PREESNTS:

THAT WHEREAS, the City of Ukiah, organized and operating under the laws of the State of California, (hereinafter referred to as the “City”) has awarded to ______________________________, (hereinafter referred to as the “Contractor”) an agreement for Contract No. _______________ (hereinafter referred to as the “Project”).

WHEREAS, the work to be performed by the Contractor is more particularly set forth in the Contract for the Project dated _______________________, (hereinafter referred to, together with all attachments and exhibits thereto, as “Contract Documents”), the terms and conditions of which are expressly incorporated herein by reference; and
WHEREAS, the Contractor is required by the Contract Documents to perform the terms thereof and to furnish a bond for the faithful performance of said Contract Documents.

NOW, THEREFORE, we, __________________________, the undersigned Contractor and _________________________, as Surety, a corporation organized and duly authorized to transact business under the laws of the State of California, are held firmly bound until the City in the sum of ______________________________ ($_________________), for which amount well and truly to be made, we bind ourselves, our heirs ,executors and administrators, successors and assigns, jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION IS SUCH that, if the Contractor, his or its heirs, executors, administrators, successors or assigns, shall in all things stand to and abide by, and well and truly keep and perform the covenants, conditions and agreements in the Contract Documents and any alteration thereof made as therein provided, on its part, to be kept and performed at the time and in the manner therein specified, and in all respects according to their intent and meaning; and shall faithfully fulfill all obligations; and shall indemnify and save harmless the City, its officials, officers, employees, and authorized volunteers, as stipulated in said Contract Documents, then this obligation shall become null and void; otherwise it shall be and remain in full force and effect.

As part of the obligation secured hereby and in addition to the face amount specified therefore, there shall be included costs and reasonable expenses and fees including reasonable attorneys’ fees, incurred by the City in enforcing such obligation.

As a condition precedent to the satisfactory completion of the Contract Documents, unless otherwise provided for in the Contract Documents, the above obligation shall hold good for a period of one (1) year after the acceptance of the work by the City, during which time if Contractor shall fail to make full, complete, and satisfactory repair and replacements and totally protect the City from loss or damage resulting from or caused by defective materials or faulty workmanship. The obligations of Surety hereunder shall continue so long as any obligation of Contractor remains. Nothing herein shall limit the City’s rights or the Contractor or Surety’s obligations under the Contract Documents, law or equity, including, but not limited to, California Code of Civil Procedure Section 337.15.

Whenever Contractor shall be, and is declared by the City to be, in default under the Contract Documents, the Surety shall remedy the default pursuant to the Contract Documents, or shall promptly, at the City’s option:
i. Take over and complete the Project in accordance with all terms and conditions in the Contract Documents; or

Page 645 of 1534 ends

RIVERSIDE PARK REGENERATION 94 Spec No.24-05
REFLECTING ADDENDUM 3
ii. Obtain a bid or bids for completing the Project in accordance with all terms and conditions in the Contract Documents and upon determination by Surety of the lowest responsive and responsible bidder, arrange for a contract between such bidder, the Surety and the City, and make available as work progresses sufficient funds to pay the cost of completion of the Project, less the balance of the contract price, including other costs and damages for which Surety may be liable. The term “balance of the contract price” as used in this paragraph shall mean the total amount payable to Contractor by the City under the Contract and any modification thereto, less any amount previously paid by the City to the Contractor and any other set offs pursuant to the Contract Documents. iii. Permit the City to complete the Project in any manner consistent with California law and make available as work progresses sufficient funds to pay the cost of completion of the Project, less the balance of the contract price, including other costs and damages for which Surety may be liable. The term “balance of the contract price” as used in this paragraph shall mean the total amount payable to Contractor by the City under the Contract and any modification thereto, less any amount previously paid by the City to the Contractor and any other set offs by the City pursuant to the Contract Documents.

Surety expressly agrees that the City may reject any contractor or subcontractor which may be proposed by Surety in fulfillment of its obligations in the event of default by the Contractor.

Surety shall not utilize Contractor in completing the Project nor shall Surety accept a bid from Contractor for completion of the Project if the City, when declaring the Contractor in default, notifies Surety of the City’s objection to Contractor’s further participation in the completion of the Project.

The Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Contract Documents or to the Project to be performed thereunder shall in any way affect its obligation on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Contract Documents or to the Project. [REMAINDER OF PAGE LEFT INTENTIONALLY BLANK]

Page 646 of 1534 ends

RIVERSIDE PARK REGENERATION 95 Spec No.24-05
REFLECTING ADDENDUM 3
IN WITNESS WHEREOF, we have hereunto set our hands and seals this ____ day of ___________________, 2022.
(Corporate Seal) ________________________________
Contractor/Principal
By______________________________

Title_____________________________
(Corporate Seal) _________________________________
Surety
By_______________________________
Attorney-in-Fact
(Attach Attorney-in Fact Certificate) Title______________________________ The rate of premium on this bond is __________________ per thousand. The total amount of premium charges is $_________________________.
(The above must be filled in by corporate attorney.)
THIS IS A REQUIRED FORM.

Any claims under this bond may be addressed to:
(Name and Address of Surety) ________________________________ ________________________________
________________________________
(Name and Address of Agent or ________________________________ Representative for service of process in ________________________________ California, if different from above) ________________________________ (Telephone number of Surety and Agent _______________________________ or Representative for service of process in California)

Page 647 of 1534 ends

RIVERSIDE PARK REGENERATION 96 Spec No.24-05
REFLECTING ADDENDUM 3

CITY OF UKIAH
Mendocino County, California

PAYMENT BOND
BOND No. ____________________
KNOW ALL PERSONS BY THESE PRESENTS:

WHEREAS, the City of Ukiah (“City”) has awarded to _______________________ (“Contractor/Principal”) a contract (City Agreement No. _____________, dated _________________, ___________, referred to as the “Agreement”) for the work described as _______________________. The Agreement is incorporated by this reference into this Payment Bond (“Bond”); and
WHEREAS, Contractor/Principal is required to furnish a bond in connection with the Agreement and pursuant to California Civil Code section 9550;
NOW, THEREFORE, we ____________________________________________, the undersigned Contractor/Principal, and _____________________ (“Surety”), a corporation organized and existing under the laws of the State of _____________________, and duly authorized to transact business under the laws of the State of California, as Surety, are held firmly bound until the City, and to any and all persons, companies, or corporations entitled by law to file stop payment notices under California Civil Code Section 9100, or any person, company, or corporation entitled to make a claim on this bond, in the sum of $_________________________, for which payment will and truly be made, we bind ourselves, our heirs, executors and administrators, successors and assigns, jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION IS SUCH that if Contractor/Principal, its heirs, executors, administrators, successors, or assigns, or subcontractor, shall fail to pay any person or persons named in Civil Code section 9100; or fail to pay for any materials, provisions, or other supplies, used in, upon, for , or about the performance of the work contracted to be done, or for any work or labor thereon of any kind, or for amounts due under the Unemployment Insurance Code, with respect to work or labor thereon of any kind; or shall fail to deduct, withhold, and pay over to the Employment Development Department, any amounts required to be deducted, withheld, and paid over by Unemployment Insurance Code Section 13020 with respect to work and labor thereon of any kind, then Surety will pay for the same, in an amount not exceeding the amount herein above set forth, and in the event suit is brought upon this bond, also will pay such reasonable attorneys’ fees as shall be fixed by the court, awarded and taxed as provided in California Civil Code Section 9550, et seq.

It is further stipulated and agreed that the Surety of this bond shall not be exonerated or released from the obligation of the bond by any change, extension of time for performance, addition, alteration or modification in, to, or of any contract, plans, or specifications, or agreement pertaining or relating to any scheme or work of improvement herein above described; or pertaining or relating to the furnishing of labor, materials, or equipment therefor; nor by any change or modification of any terms of payment or extension of time for payment pertaining or relating to any scheme or work of improvement herein above described; nor by any rescissions or attempted rescission of the contract, agreement or bond; nor by any conditions precedent or subsequent in the bond attempting to limit the right of recovery of claimants otherwise entitled to recover under any such contract or agreement or under the bond; nor by any fraud practiced by any person other than the claimant seeking to recover on the bond; and that this bond be construed most strongly against the Surety and in favor of all persons for whose benefit such bond is give; and under no circumstances shall the Surety be released from liability to those for whose benefit such bond has been given, by reason of any breach of contract between the Owner and Contractor/Principal or on the part of any oblige named in such bond; that the sole condition of recovery shall be that the claimant is a person described in California Civil Code section 9100, and who has not been paid the full amount of his or her claim; and that the Surety does hereby waive notice of any such change, extension of time, addition, alteration or modification herein mentioned, including but not limited to the provisions of section 2819 and 2845 of the California Civil Code.

Page 648 of 1534 ends

RIVERSIDE PARK REGENERATION 97 Spec No.24-05
REFLECTING ADDENDUM 3
Any notice to Surety may be given in the manner specified in the Agreement and delivered or transmitted to Surety as follows:

Attn:__________________________________________
Address:_______________________________________
City/State/Zip:___________________________________
Phone:_________________________________________
Fax:___________________________________________
Email:__________________________________________
IN WITNESS WHEREO, two identical counterparts of this Bond, each of which shall for all purposes be deemed an original thereof, have been duly executed by Contractor/Principal and Surety above named, on the __ day of ____________________, 202__.
__________________________________ (SEAL)
Contractor/Principal
By_____________________________________
Contractor’s Representative
______________________________________
Contractor/Principal’s Address
______________________________________
City,State,Zip
_________________________________(SEAL)
Surety
By_____________________________________
Surety’s Representative
______________________________________
Surety’s Address
______________________________________
City,State,Zip
______________________________________
Telephone Number
NOTE: Signatures of those executing for Surety must be properly acknowledged, The bond must be accompanied by a properly acknowledged Power of Attorney from the Surety authorizing its agent to bind it to this bond. A copy of such Power of Attorney must be in file with the City.

Page 649 of 1534 ends

RIVERSIDE PARK REGENERATION 98 Spec No.24-05
REFLECTING ADDENDUM 3

DIRECTIONS FOR PREPARATION OF PERFORMANCE AND MATERIAL AND LABOR BOND

1. Individual sureties, partnerships, or corporations not in the surety business will not be acceptable.

2. The name of the Principal shall be shown exactly as it appears in the Contract.

3. The penal sum shall not be less than required by the Specifications.

4. If the Principals are partners or joint venturers, each member shall execute the bond as an individual and state his place of residence.

5. If the Principal is a corporation, the bond shall be executed under its corporate seal.

If the corporation has no corporate seal, it shall so state and affix a scroll or adhesive seal following the corporate name.

6. The official character and authority of the person(s) executing the bond for the Principal, if a corporation, shall be certified by the Secretary or Assistant Secretary thereof under the corporate seal, or copies attached to such records of the corporation as will evidence the official character and authority of the officer signing, duly certified by the Secretary or Assistant Secretary, under the corporate seal, to be true copies.

7. The current power-of-attorney of the person signing for the surety company must be attached to the bond.

8. The date of the bond must not be prior to the date of the Contract.

9. The following information must be placed on the bond by the surety company:
a. The rate of premium in dollars per thousand; and
b. The total dollar amount of premium charged.

10. The signature of a witness shall appear in the appropriate place attending to the signature of each party of the bond.

11. Type or print the name underneath each signature appearing on the bond.

12. An executed copy of the bond must be attached to each copy of the Contract (original counterpart) intended for signing.

Page 650 of 1534 ends

RIVERSIDE PARK REGENERATION 99 Spec No.24-05
REFLECTING ADDENDUM 3

CITY OF UKIAH
Mendocino County, California

DEFECTIVE MATERIAL AND WORKMANSHIP (MAINTENANCE) BOND

KNOW ALL MEN BY THESE PRESENTS,
That we, _____________________________________________________________________ __________________________________________________________________, as PRINCIPAL and__________________________________________________________________________ ___________________________________________________________________, as SURETY, are held and firmly bound unto the City of Ukiah as Obligee, in the penal sum of ___________________________________________________________________________________ _________________________________________________________($____________________), (5 PERCENT OF THE FINAL CONTRACT AMOUNT)
to which payment well and truly to be made, we do bind ourselves, our and each of our heirs, executors, administrators successors and assigns jointly and severally, firmly by these presents.

WHEREAS, the said Principal entered into a Contract with the City of Ukiah dated_________________________
for _________________________________________________________________________________ ____________________________________________________________________________________ WHEREAS, said Contract has been completed, and was approved on the ______ day of ___________, _________,
NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the Principal shall guarantee that the work will be free of any defective materials or workmanship which become apparent during the period of one (1) year following completion of the Contract, then this obligation shall be void, otherwise to remain in full force and effect, provided however, any additional warranty or guarantee whether expressed or implied is extended by the Principal or Manufacturer only, and the surety assumes no liability for such a guarantee.

Signed, sealed, and dated this __________ day of ____________, 20_____. __________________________________________________(Seal) BY:_______________________________________________(Seal) __________________________________________________(Seal) Principal
__________________________________________________(Seal) BY:_______________________________________________(Seal) __________________________________________________(Seal) Surety

Page 651 of 1534 ends

STORMWATER POLLUTION PREVENTION PLAN
for
Riverside Park Regeneration Project
Project Location:
1281 E Gobbi St, Ukiah, CA 95482
WDID: [Insert Number]
RISK LEVEL: 2
Legally Responsible Person (LRP):

Tim Ericksen
Director of Public Works and City Engineer
300 Seminary Drive, Ukiah, CA 95482
707-463-6280
Duly Authorized Representative (DAR):
[DAR if designated by LRP]
[Phone Number]
Project Address:
1281 E Gobbi St, Ukiah, CA 95482
Site Operating Hours:
7 AM to 6 PM; Monday through Friday
Estimated Project Dates:

Start of Construction: June 1, 2024
Completion of Construction: October 14, 2024
SWPPP Prepared by:

Company
Address
SWPPP Preparation Date:

March 2024
QSD Name and Signature:
[QSD Sign Here]
Name, QSD Number
Appendix A

Page 652 of 1534 ends

CASQA Traditional SWPPP Template ii March 2024
for the 2022 CGP
Contact Information
Role Name Phone Number License or Certification
Number, if Applicable
Qualified SWPPP
Developer (QSD)
Qualified SWPPP
Practitioner (QSP)
Qualified SWPPP
Practitioner (QSP)
QSP Delegate
QSP Delegate
QSP Delegate
QSP Delegate
Index of Appendices
Appendix Title Page
A Site Maps and Drawings A-1
B Permit Registration Documents B-1
C SWPPP Amendment QSD Certifications C-1
D Submitted Changes of Information D-1
E Construction Schedule E-1
F Construction Activities, Materials Used, and Associated Pollutants
F-1
G CASQA Stormwater BMP Handbook: Construction Fact Sheets G-1 H BMP Inspection Form H-1
I Training Forms I-1
J Responsible Parties J-1
K Contractors and Subcontractors K-1
L Calculations L-1
M Weather Reports M-1
N Monitoring Records N-1
O Example Storm Event Monitoring Forms O-1
P Field Meter Instructions P-1
Q Supplemental Information Q-1
R Active Treatment System and Passive Treatment Plans R-1 S Construction General Permit S-1

Page 653 of 1534 ends

CASQA Traditional SWPPP Template iii March 2024
for the 2022 CGP
Table of Contents
Table of Contents .................................................................................................. iii Qualified SWPPP Developer ..................................................................................vi Amendment Log .................................................................................................. vii Section 1 SWPPP Requirements .................................................................. 1-1

1.1 Introduction................................................................................................................... 1-1

1.2 Permit Registration Documents .................................................................................... 1-1

1.3 SWPPP Availability and Implementation..................................................................... 1-2

1.4 SWPPP Amendments.................................................................................................... 1-2

1.5 Retention of Records .................................................................................................... 1-4

1.6 Reporting ...................................................................................................................... 1-4

1.7 Changes to Permit Coverage......................................................................................... 1-5

1.8 Notice of Termination................................................................................................... 1-5 Section 2 Project Information...................................................................... 2-1

2.1 Project and Site Description ......................................................................................... 2-1

2.1.1 Site Description........................................................................................................ 2-1

2.1.2 Existing Conditions.................................................................................................. 2-1

2.1.3 Existing Drainage..................................................................................................... 2-1

2.1.4 Geology and Groundwater....................................................................................... 2-2

2.1.5 Project Description .................................................................................................. 2-2

2.1.6 Developed Condition ............................................................................................... 2-2

2.2 Permits and Governing Documents.............................................................................. 2-3

2.3 Stormwater Run-On from Offsite Areas....................................................................... 2-3

2.4 Findings of the Construction Site Sediment and Receiving Water Risk Determination 2- 4 2.5 Construction Schedule.................................................................................................. 2-5

2.6 Potential Construction Activity and Pollutant Sources ................................................ 2-6

2.7 TMDL Requirements .................................................................................................... 2-6

2.8 Identification of Non-Stormwater Discharges ............................................................. 2-6

2.9 Required Site Map Information.................................................................................... 2-7 Section 3 Best Management Practices.......................................................... 3-1

3.1 Schedule for BMP Implementation .............................................................................. 3-1

3.2 Erosion and Sediment Control ..................................................................................... 3-2

3.2.1 Erosion Control........................................................................................................ 3-2

3.2.2 Sediment Controls ................................................................................................... 3-6

Page 654 of 1534 ends

CASQA Traditional SWPPP Template iv March 2024
for the 2022 CGP

3.3 Non-Stormwater Controls and Waste and Materials Management.............................3-8

3.3.1 Non-Stormwater Controls .......................................................................................3-8

3.3.2 Materials Management and Waste Management.................................................. 3-10

3.4 TMDL-Related BMPs.................................................................................................. 3-13

3.5 Post Construction Stormwater Management Measures............................................. 3-14 Section 4 BMP Inspection and Maintenance ................................................4-1

4.1 BMP Inspection and Maintenance ............................................................................... 4-1 Section 5 Training........................................................................................5-1 Section 6 Responsible Parties and Operators...............................................6-1

6.1 Responsible Parties....................................................................................................... 6-1

6.2 Contractor List..............................................................................................................6-3 Section 7 Construction Site Monitoring Program ........................................ 7-1

7.1 Purpose .....................................................................................................................7-1

7.2 Applicability of Permit Requirements ......................................................................7-1

7.3. Weather and Precipitation Event Tracking ..............................................................7-1

7.4 Monitoring Locations .............................................................................................. 7-2

7.5 Safety and Monitoring Exemptions......................................................................... 7-2

7.6 Visual Monitoring .................................................................................................... 7-2

7.7 Water Quality Sampling and Analysis ..................................................................... 7-5

7.8 Active Treatment System Monitoring.................................................................... 7-18

7.9 Passive Treatment Monitoring .............................................................................. 7-18

7.10 Watershed Monitoring Option .............................................................................. 7-18

7.11 Quality Assurance and Quality Control ................................................................. 7-18

7.12 Records Retention ..................................................................................................7-21 Section 8 References....................................................................................8-1

Page 655 of 1534 ends

CASQA Traditional SWPPP Template v March 2024
for the 2022 CGP
Appendices
Appendix A: Site Maps and Drawings
Appendix B: Permit Registration Documents
Appendix C: SWPPP Amendment QSD Certifications
Appendix D: Submitted Changes of Information
Appendix E: Construction Schedule
Appendix F: Construction Activities, Materials Used, and Associated Pollutants Appendix G: CASQA Stormwater BMP Handbook: Construction Fact Sheets Appendix H: BMP Inspection Form
Appendix I: Training Forms
Appendix J: Responsible Parties
Appendix K: Contractors and Subcontractors
Appendix L: Calculations
Appendix M: Weather Reports
Appendix N: Monitoring Records
Appendix O: Example Storm Event Monitoring Forms
Appendix P: Field Meter Instructions
Appendix Q: Supplemental Information
Appendix R: Active Treatment System and Passive Treatment Plans Appendix S: Construction General Permit

Page 656 of 1534 ends

CASQA Traditional SWPPP Template vi March 2024
for the 2022 CGP
Qualified SWPPP Developer
Approval and Certification of the Stormwater Pollution Prevention Plan Project Name: Riverside Park Regeneration Project
Project Number/ID:
[if applicable]
“This Stormwater Pollution Prevention Plan and its appendices were prepared under my direction to meet the requirements of the California Construction Stormwater General Permit (Order No. 2022- 0057-DWQ). I certify that I am a Qualified SWPPP Developer in good standing as of the date signed below and will maintain up to date credentials for the duration of the project.” QSD Signature Date
Name QSD Number
Title, Company Phone number
Email address

Page 657 of 1534 ends

CASQA Traditional SWPPP Template
for the 2022 CGP vii March 2024
Amendment Log
Project Name: Riverside Park Regeneration Project
Project Number/ID:
[if applicable]
Amendment
No. Date Brief Description of Amendment (include section and page number) Prepared and
Approved By
Name:

QSD#
Name:

QSD#
Name:

QSD#
The SWPPP will be revised when:
• There is a 2022 CGP violation (2022 CGP Section VI.Q.1); • There is a reduction or increase in total disturbed acreage (2022 CGP Section III.F.2. and F.4);
• BMPs are not effective and are not resulting in a reduction or elimination of pollutants in stormwater discharges and authorized non-stormwater discharges (2022 CGP Section VI.Q.1 and Attachment E Section III.C.5);
• There is a change in the project duration that changes the project Risk Type (2022 CGP Section III.F.1);
• Dischargers with projects where all construction activities (including passive treatment, active treatment systems, and/or active equipment) will be suspended for 30 days or more (2022 CGP Section III.G);
• There is a change in construction or operations that may affect the discharge of pollutants to surface waters, groundwater(s), or a municipal separate storm sewer system (MS4) (2022 CGP Sections IV.O. and VI.Q.1); or
When deemed necessary by the QSD. The QSD has determined that the changes listed in Table 1-1 can be field determined by the QSP. All other changes will be made by the QSD as formal amendments to the SWPPP. Note that the 2022 CGP requires that the QSD “revise the SWPPP to address potential problems identified by visual inspections, sampling data, comments from a QSP, or their own site observations (2022 CGP Section V.C.2.).

SWPPP Amendment QSD Certifications are located in Appendix C.

Page 658 of 1534 ends

CASQA Traditional SWPPP Template 1-1 March 2024
for the 2022 CGP
Section 1 SWPPP Requirements

1.1 INTRODUCTION
This Stormwater Pollution Prevention Plan (SWPPP) is designed to comply with California’s General Permit for Stormwater Discharges Associated with Construction and Land Disturbance Activities (2022 CGP), State Water Resources Control Board (State Water Board) Order No. 2022-0057-DWQ (NPDES No. CAS000002) (Appendix S). This SWPPP has been prepared following the 2022 CGP SWPPP Template for Traditional Projects provided in the California Stormwater Quality Association (CASQA) Stormwater Best Management Practice (BMP) Handbook: Construction (CASQA 2023).

This project is considered a traditional construction project.

In accordance with the 2022 CGP, Section IV.O, this SWPPP is designed to address the following:
• Identification of all pollutants, their sources, and control mechanisms, including sources of sediment associated with all construction activities (e.g., sediment, paint, cement, stucco, cleaners, site erosion);
• Pollutant source assessments, including a list of potential pollutant sources and identification of site areas where additional BMPs are necessary to reduce or prevent pollutants in stormwater and authorized non-stormwater discharges, per the minimum requirements when developing the pollutant source assessment; • Description of site-specific BMPs implemented to reduce or eliminate stormwater pollution;
• Where not otherwise required to be under a Regional Water Quality Control Board (Regional Water Board) permit, all non-stormwater discharges are identified and either eliminated, controlled, or treated;
• Site BMPs are effective and result in the reduction or elimination of pollutants in stormwater discharges and authorized non-stormwater discharges from construction activity to the Best Available Technology/Best Control Technology (BAT/BCT) standard; and;
• Stabilization BMPs are installed to reduce or eliminate pollutants after construction is completed are effective and maintained; and
• Calculations and design details, as well as BMP controls, are complete and correct.

The Riverside Park Regeneration Project (Project or Site) comprises approximately 8.6 acres, of which 6.52 will be disturbed. The Project is located at 1281 E Gobbi Street in Ukiah, California.

The property is owned by the City of Ukiah and is being developed by the City as a park. The project’s location is shown on the Site Maps in Appendix A.

1.2 PERMIT REGISTRATION DOCUMENTS
Required Permit Registration Documents (PRDs) shall be submitted to the State Water Board via the Stormwater Multi Application and Report Tracking System (SMARTS) by the LRP or DAR. The project-specific PRDs include (2022 CGP Section III.A):

1. Notice of Intent (NOI);

Page 659 of 1534 ends

CASQA Traditional SWPPP Template 1-2 March 2024
for the 2022 CGP

2. Risk Level Determination (Construction Site Sediment and Receiving Water Risk Determination);

3. Site Drawings and Map;

4. SWPPP;

5. Applicable plans, calculations, and other supporting documentation for compliance with the Phase I or Phase II municipal separate storm sewer system (MS4) post construction requirements or the post-construction standards of the 2022 CGP:
• Attachment or web-source containing the applicable Phase I or Phase II MS4 post construction requirements; [This site is not located within an MS4 permit area] • The post construction plans and calculations submitted to or approved by the applicable Phase I or Phase II MS4; and/or [This site is not located within an MS4 permit area]
• Post-construction water balance calculation; [A hydrologic analysis has been conducted for this project (ESA 2020)]

6. Dischargers proposing an alternate K-factor or LS-factor must submit documentation to support the site-specific factors, if applicable;

7. Annual Fee per the current 23 California Code of Regulations Chapter 9 fee schedule for National Pollutant Discharge Elimination System (NPDES) stormwater permits; and

8. Signed Certification Statement (LRP Certification is provided electronically with SMARTS PRD submittal).

Site Maps can be found in Appendix A. A copy of the submitted PRDs shall also be kept in Appendix B along with the Waste Discharge Identification (WDID) confirmation.

1.3 SWPPP AVAILABILITY AND IMPLEMENTATION
The SWPPP will be available at the construction site during working hours listed on the title sheet (7 a.m. to 6 p.m., Monday through Friday) and Section 7.5, while construction is occurring and shall be made available upon request by a federal, state, or municipal inspector. A current copy of the site-specific SWPPP and any site inspection reports required by the 2022 CGP may be kept in electronic format at the site so long as the information requested by a federal, state, or municipal inspector can be made available during an inspection. Legible maps in hard copy must be available at the site (2022 CGP Section IV.O.1.).

The SWPPP must be implemented at the appropriate level to protect water quality at all times throughout the life of the project. The SWPPP must remain on the site during construction activities, commencing with the initial mobilization and ending with the termination of coverage under the 2022 CGP.

1.4 SWPPP AMENDMENTS
SWPPP changes or amendments will be uploaded through SMARTS within 30 calendar days.

The SWPPP will be revised when:
• If there is a 2022 CGP violation (2022 CGP Section VI.Q.1); • There is a reduction or increase in total disturbed acreage (2022 CGP Section III.F.2 and F.4.);

Page 660 of 1534 ends

CASQA Traditional SWPPP Template 1-3 March 2024
for the 2022 CGP
• BMPs are not effective and are not resulting in a reduction or elimination of pollutants in stormwater discharges and authorized non-stormwater discharges (2022 CGP Section VI.Q.1 and Attachment D Section III.C.5);
• There is a change in the project duration that changes the project’s risk level (2022 CGP Section III.F.1); or
• Dischargers with projects where all construction activities (including passive treatment, active treatment systems, and/or active equipment) will be suspended for 30 days or more (2022 CGP Section III.G.).

Additionally, the SWPPP will be amended when:
• There is a change in construction or operations that may affect the discharge of pollutants to surface waters, groundwater(s), or a municipal separate storm sewer system (MS4) (2022 CGP Sections IV.O. and VI.Q.1); or
When deemed necessary by the QSD. The QSD has determined that the changes listed in Table 1-1 can be field determined by the QSP. All other changes will be made by the QSD as formal amendments to the SWPPP. Note that the 2022 CGP requires that the QSD revise the SWPPP to address potential problems identified by visual inspections, sampling data, comments from a QSP, or their own site observations (2022 CGP Section V.C.2.).

The following items shall be included in each amendment:
• Who requested the amendment;
• The location of proposed change;
• The reason for change;
• The original BMP(s) proposed, if any;
• The new BMP(s) proposed; and
• QSD certification.

SWPPP amendments will be logged at the front of the SWPPP and SWPPP Amendment QSD certifications will be located in Appendix C. The SWPPP text will be revised, replaced and/or hand annotated as necessary to properly convey the amendment. SWPPP amendments must be made by a QSD. The following changes have been designated by the QSD as “to be field determined” and constitute minor changes that the QSP may implement based on field conditions.

Table 1-1 List of Changes to be Field Determined
Candidate changes for field location or
determination by QSP (1)
Check changes that can be field
located or field determined by
QSP
Increase quantity of an Erosion or Sediment
Control Measure Yes
Relocate/add stockpiles or stored materials Yes
Relocate or add toilets Yes
Relocate vehicle storage and/or fueling locations Yes

Page 661 of 1534 ends

CASQA Traditional SWPPP Template 1-4 March 2024
for the 2022 CGP
Table 1-1 List of Changes to be Field Determined
Candidate changes for field location or
determination by QSP (1)
Check changes that can be field
located or field determined by
QSP
Relocate areas for waste storage Yes
Relocate water storage and/or water transfer
location Yes
Changes to access points (entrance/exits) Yes
Change type or location of Erosion or Sediment
Control Measure Yes
Minor changes to schedule or phases Yes
Changes in construction materials Yes
(1) Any field changes not identified for field location or field determination by the QSP must be made as an amendment by the QSD.

1.5 RETENTION OF RECORDS
Paper or electronic records of documents required by this SWPPP will be retained for a minimum of three years from the date generated or date submitted, whichever is later, for the following items:
• SWPPP;
• Visual monitoring reports;
• Sampling equipment calibration records (if applicable); • pH and turbidity sampling field sheets (if applicable); and • Analytical laboratory reports (if applicable)
These records will be available at the Site until construction is complete. Records assisting in the determination of compliance with the 2022 CGP will be made available within a reasonable time to the Regional Water Board, State Water Board, or U.S. Environmental Protection Agency (EPA) upon request. Requests by the Regional Water Board for retention of records for a period longer than three years will be adhered to.

1.6 REPORTING
Completed inspection checklists are not required to be submitted to the Regional Water Board.

However, completed inspection checklists will be kept with the SWPPP on-site or electronically.

The 2022 CGP requires that permittees prepare, certify, and electronically submit an Annual Report no later than September 1 of each year. Reporting requirements are identified in 2022 CGP Section VI.P. Annual reports will be filed in SMARTS and in accordance with information required by the online forms.

Planned changes in site construction activities that may result in non-compliance with the 2022 CGP are required to be provided in writing to the Regional Water Board and local stormwater agency in advance of the changes.

If a 2022 CGP discharge violation occurs, the QSP will immediately notify the LRP. The LRP will include information on the violation with the Annual Report. Corrective measures will be

Page 662 of 1534 ends

CASQA Traditional SWPPP Template 1-5 March 2024
for the 2022 CGP
implemented immediately following identification of the discharge or written notice of noncompliance from the Regional Board. Discharges and corrective actions must be documented and include the following items:
• The date, time, location, nature of operation, and type of unauthorized discharge; • The cause or nature of the notice or order;
• The BMPs deployed before the discharge event, or prior to receiving notice or order; and • The date of deployment and type of BMPs deployed after the discharge event, or after receiving the notice or order, including additional measures installed or planned to reduce or prevent re-occurrence.

Results of (pH and turbidity, etc.) monitoring will be electronically submitted through SMARTS for all field sampling results within 30 days of the completion of the precipitation event or within 10 days if the field sampling results demonstrate the exceedance of the pH and/or turbidity NALs. See Section 7.7.2.7 for additional discussion of the reporting requirements.

Reporting requirements for pH and turbidity Receiving Water Monitoring Triggers are discussed in Section 7.7.2.7.

Results of non-visible pollutant monitoring and corrective actions will be electronically submitted within 30 days after obtaining analytical results or within 10 days if the analytical results demonstrate the exceedance of an applicable TMDL-related NAL or NEL or Basin Plan parameter. See Section 7.7.1.7 for additional discussion of the reporting requirements.

A NAL exceedance report will be prepared when requested, in writing, by the Regional Water Board.

In the event of a TMDL NEL exceedance, by the end of each reporting year the project will submit and certify, in SMARTS, documentation of the site assessment, SWPPP evaluation, and implementation of the corrective actions.

1.7 CHANGES TO PERMIT COVERAGE
The 2022 CGP allows for the reduction or increase of the total acreage covered under the 2022 CGP when: a portion of the project is complete and/or conditions for termination of coverage have been met; when ownership of a portion of the project is purchased by a different entity; or when new acreage is added to the project.

Modified PRDs will be filed electronically through a Change of Information (COI) within 30 days of a reduction or increase in total disturbed area if a change in permit-covered acreage is to be sought. The SWPPP will be modified appropriately and will be logged at the front of the SWPPP. SWPPP Amendments QSD Certifications will be located in Appendix C. COIs submitted electronically via SMARTS can be found in Appendix D.

1.8 NOTICE OF TERMINATION
A Notice of Termination (NOT) must be submitted electronically by the LRP or DAR via SMARTS to terminate coverage under the 2022 CGP.

According to the requirements of 2022 CGP Section III.H.4., one of the following final stabilization methods will be used to satisfy final stabilization condition requirements:
• 70 percent final cover method supported by pre- and post-project photographs demonstrating stabilization. [Note: 4.74 acres of the site will be cleared and grubbed;

5.10 acres will be planted]

Page 663 of 1534 ends

CASQA Traditional SWPPP Template 1-6 March 2024
for the 2022 CGP
• RUSLE or RUSLE2 method with computation proof supported by pre- and post-project photographs demonstrating stabilization. [This method will not be used] • Custom method for which Regional Water Board approval has been obtained, supported by documentation required by the Regional Water Board and pre- and pos- project photographs demonstrating stabilization. [This method will not be used] The Regional Water Board will consider a construction site complete when the conditions of the 2022 CGP Section III.H., have been met.

The discharger is required to submit the following in SMARTS:
• NOT SMARTS Form;
• QSP-prepared final NOT inspection which includes the QSP name and valid QSP certificate number;
• Final site map with photo orientation references;
• Photos demonstrating final stabilization and the applicable post-construction BMPs and/or low impact development; and
• A long-term maintenance plan for the post-construction stormwater runoff BMPs and/or low impact development features being implemented.

According to the 2022 CGP, the NOT will be automatically approved within 30 calendar days after the date the NOT was submitted, unless, within the 30 calendar days the Regional Water Board notifies the discharger through SMARTS that the Notice of Termination has been denied, returned, or accepted for review (2022 CGP Section III.H.7).

Note: If an Annual Report has not been filed in the current reporting year, an Annual Report will need to be submitted prior to the NOT.

Page 664 of 1534 ends

CASQA Traditional SWPPP Template 2-1 March 2024
for the 2022 CGP
Section 2 Project Information

2.1 PROJECT AND SITE DESCRIPTION

2.1.1 Site Description
The Riverside Park Regeneration Project site is Risk Level 2 that will include approximately 6.52 acres of ground disturbance located at 1281 East Gobbi Street in Ukiah, California (see Sheet L0.0 in Appendix A). The project site is located at the eastern end of East Gobbi Street in Riverside Park. The project site is located approximately 200 feet west of the Russian River.

The project is located at latitude 39.143399, and longitude -123.182880.

2.1.2 Existing Conditions
As of the initial date of this SWPPP, the project site is undeveloped with some vegetated areas, some dirt roads, and three debris piles of concrete, asphalt, and street sweepings. Some household debris is also present in scattered locations. Parts of the project site were previously used at different times for sewage treatment ponds, a trap shooting range, and a police shooting range. The sewage treatment ponds and shooting ranges were previously removed by 1978. Soil sampling and analysis was conducted to test for residual contamination; the results of this analysis are in Appendix Q. The results identified one hot spot of soil with lead and pesticides at concentrations above regulatory action levels (see Sheet L1.3 in Appendix A). This hot spot area will be removed and disposed of at an offsite disposal facility permitted to accept the waste.

2.1.3 Existing Drainage
The project site is relatively level and hummocky with three debris piles. The elevation of most the project site ranges from 580 to 585 feet above mean sea level (msl). The two small jurisdictional wetlands shown on Sheet L1.2 are seasonal wetlands likely fed by groundwater or underflow from the river and are as low as 572 feet above msl. The three debris piles shown on Sheet L1.2 rise as high as about 594 feet above msl. Surface drainage at the site is internal and does not directly drain to the Russian River. Stormwater infiltrates into the onsite soil or flows to the internal jurisdictional wetlands. Existing site topography, drainage patterns, and stormwater conveyance systems are shown on Sheet L1.0 in Appendix A.

The project does not directly discharge to any surface water bodies. However, the site is about 200 feet west of the Russian River. This reach of the river is identified as a 303(d) listed water body: Russian River HU, Upper Russian River HA, Ukiah HSA. The water quality impairments (303 (d) list and TMDLs identified in the 2022 CGP Table H-1 for the receiving waters are identified in Table 2-1.

Table 2-1 Applicable 303(d) List Impairments and TMDLs
Receiving Water Water Quality Impairment
303(d) list TMDL (2022 CGP Table
H-1)
Russian River, Ukiah Reach Aluminum, manganese,
sediment, and temperature
Not yet established

Page 665 of 1534 ends

CASQA Traditional SWPPP Template 2-2 March 2024
for the 2022 CGP

2.1.4 Geology and Groundwater
The site is underlain by a heterogenous mix of mostly gravel, sand, and silt from previous poorly-documented fill events. Groundwater occurs beneath the site at a few feet below grade, and is likely a combination of groundwater migrating from upland areas from the west and underflow from the Russian River. The groundwater gradient is unknown but assumed to be southerly since the Russian River also flows south.

2.1.5 Project Description
Project grading will occur on approximately 6.52 acres of the project site, which comprises approximately 76 percent of the total area. The limits of grading are shown on Sheet L1.3 through L1.6 in Appendix A. Grading will include both cut and fill activities. About 1,140 cubic yards of clay soil would be imported to the site because the existing soils are of poor quality for vegetation. Approximately 90 cubic yards of decomposed granite would be imported and installed on the walking pathways shown on Sheet L2.0 in Appendix A.

For export, about 228 cubic yards of contaminated soil will be disposed of at an offsite facility permitted to accept the waste (see Sheet L1.3 in Appendix A). The soil sampling report in Appendix Q provides further information regarding the contaminated soil. Approximately 2,260 cubic yards of existing waste piles (see Sheet L1.2 in Appendix A) consisting of concrete, relic asphalt, and other debris will be removed and recycled to the extent possible at a facility permitted to accept the material. Approximately 1,002 cubic yards of selected non-native invasive plant species such as Himalayan blackberry and other exotic species would be removed using hand tools and light equipment such as a weed whacker. The non-native vegetation will be sent to an offsite green waste facility.

Construction activities will be conducted in phases: (1) removal of contaminated soil and debris piles, (2) grading to final topography and installation of public access improvements as shown on Sheet L2.0 in Appendix A, and (3) revegetation.

2.1.6 Developed Condition
Post-construction surface drainage will be internal with stormwater infiltrating into the subsurface or flowing to the two jurisdictional wetlands, as it does now. Post-construction drainage patterns and conveyance systems are presented on Sheets L2.0 and L2.1 in Appendix A.

Table 2-2 Construction Site Estimates
Construction site area 9.6 acres
Total area of disturbance 6.52 acres
Percent impervious before construction 0 %
Runoff coefficient before construction n/a
Percent impervious after construction 5 %
Runoff coefficient after construction n/a

Page 666 of 1534 ends

CASQA Traditional SWPPP Template 2-3 March 2024
for the 2022 CGP

2.2 PERMITS AND GOVERNING DOCUMENTS
In addition to the 2022 CGP, the following documents have been taken into account while preparing this SWPPP:
• Regional Water Board Basin Plan requirements
• Contract Documents
• County of Mendocino: Flood Hazard Zone Development Permit

2.3 STORMWATER RUN-ON FROM OFFSITE AREAS
Run-on to the site could be generated by overland flow during storm events from offsite areas west of the project site. However, the areas west of the project site are vineyards that control erosion on their site and run-off from the vineyards would be negligible, if any. Nonetheless and as required by the 2022 CGP, silt fences will be installed along the entire border of the project site to manage run-on, if any, as shown on Sheet L1.0 in Appendix A.

Page 667 of 1534 ends

CASQA Traditional SWPPP Template 2-4 March 2024
for the 2022 CGP

2.4 FINDINGS OF THE CONSTRUCTION SITE SEDIMENT AND

RECEIVING WATER RISK DETERMINATION
A construction site risk assessment has been performed for the project and the resultant risk level is Risk Level 2.

The risk level was determined through the use of the R-value determined from EPA’s Rainfall Erosivity Factor Calculator for Small Construction Sites at: https://lew.epa.gov/ in accordance with the State Water Board Guidance for multi-year projects at:
https://www.waterboards.ca.gov/water_issues/programs/stormwater/smarts/construction/do cs/rfactor_guide.pdf, and K and LS using the SWRCB GIS file at:
ftp://swrcb2a.waterboards.ca.gov/pub/swrcb/dwq/cgp/Risk/. The risk level is based on project duration, location, proximity to impaired receiving waters, and soil conditions. A copy of the Risk Level determination with the PRDs is included in Appendix B.

Table 2-3 and Table 2-4 summarize the sediment and receiving water risk factors and document the sources of information used to derive the factors.

Table 2-3 Summary of Sediment Risk
RUSLE
Factor Value Method for Establishing Value
R 3.94 Rainfall Erosivity Factor Calculator | US EPA
K 0.28 SWRCB GIS File
LS 1.14 SWRCB GIS File
Total Predicted Sediment Loss (tons/acre) 1.26
Overall Sediment Risk
Low Sediment Risk < 15 tons/ acre
Medium Sediment Risk >= 15 and < 75 tons/acre
High Sediment Risk >= 75 tons/acre
☒ Low
☐ Medium
☐ High
Runoff from the project site discharges internally to the project site as infiltration into the subsurface or as sheet flow into two jurisdictional wetlands, as it does now. There is no direct discharge to the Russian River.

Table 2-4 Summary of Receiving Water Risk
Receiving Water
Name
303(d) Listed
for Sediment
Related
Pollutant (1)
TMDL for
Sediment Related
Pollutant (1)
Beneficial Uses of

COLD, SPAWN,
and MIGRATORY
(1)
Russian River ☒ Yes ☐ No ☒ Yes ☐ No ☒ Yes ☐ No
Overall Receiving Water Risk ☐ Low
☒ High
(1) If yes is selected for any option the Receiving Water Risk is High

Page 668 of 1534 ends

CASQA Traditional SWPPP Template 2-5 March 2024
for the 2022 CGP
Risk Level 2 sites are subject to both the narrative effluent limitations and numeric action limitations (NALs). The narrative effluent limitations require stormwater discharges associated with construction activity to minimize or prevent pollutants in stormwater and authorized nonstormwater through the use of controls, structures and best management practices (BMPs).

Discharges from Risk Level 2 site are subject to NALs for pH and turbidity shown in Table 2-5.

This SWPPP has been prepared to address Risk Level 2 requirements (2022 CGP Attachment D).

Table 2-5 Numeric Action Levels and Numeric Effluent Limits Parameter Unit Numeric Action Level Numeric Effluent
Limit
pH pH units Lower NAL < 6.5
Upper NAL > 8.5 Not Applicable
Turbidity NTU > 250 NTU Not Applicable

2.5 CONSTRUCTION SCHEDULE
The site sediment risk was determined based on construction taking place between June 1, 2024, and October 14, 2024. Modification or extension of the schedule (start and end dates) may affect risk determination and permit requirements. The LRP shall contact the QSD if the schedule changes during construction to address potential impact to the SWPPP. The estimated schedule for planned work can be found in Appendix E.

Page 669 of 1534 ends

CASQA Traditional SWPPP Template 2-6 March 2024
for the 2022 CGP

2.6 POTENTIAL CONSTRUCTION ACTIVITY AND POLLUTANT

SOURCES
Appendix F includes a list of construction activities and associated materials that are anticipated to be used onsite as well as the pollutant source assessment form that was completed for the project. These activities and associated materials will or could potentially contribute pollutants, other than sediment, to stormwater runoff.

A list of construction activities and associated materials that are anticipated to be used on site is provided below. These activities and associated materials could potentially contribute pollutants, other than sediment, to stormwater runoff:
• Excavation and removal of three concrete debris piles and one contaminated soil hot spot (sediment, lead, and residual pesticides)
• Grading and excavation to rework topography and install irrigation system (sediment) • Pouring of concrete pad for kiosk (pH)
• Equipment leaks (fuel, oil, lubricants, coolant)
• General construction waste and litter
The anticipated activities and associated pollutants were used in Section 3 to select the BMPs for the project. Locations of anticipated pollutants and associated BMPs are shown on Sheets L1.0 and L1.1 (BMPs) and L1.3 (contaminants) in Appendix A.

Additionally, proper measures will be taken to ensure that trench spoils or any other soils disturbed during construction activities that are contaminated are not discharged with stormwater or non-stormwater discharges into storm drains or water bodies (except pursuant to a separate NPDES Permit). If contaminated soil is found on site, and the responsible party cannot be identified or fails to take action, the soil will be sampled to determine proper handling and protect public safety. The appropriate local, State, and federal agencies along with the appropriate Regional Water Board will be notified when contaminated soils are observed.

For sampling requirements for non-visible pollutants associated with construction activity, please refer to Section 7.7.1. For a full and complete list of onsite pollutants, refer to the Safety Data Sheets (SDS), which are retained onsite at the construction trailer or are available electronically at the site.

2.7 TMDL REQUIREMENTS
The Russian River is not listed in the 2022 CGP Appendix H. Although the Ukiah reach of the Russian River is a 303(d) listed water body identified for aluminum, manganese, sediment, and temperature, TMDLs have not yet been established for these parameters in this reach of the river.

2.8 IDENTIFICATION OF NON-STORMWATER DISCHARGES
Non-stormwater discharges into storm drainage systems or waterways, which are not authorized under the 2022 CGP and listed in the SWPPP, or authorized under a separate NPDES permit, are prohibited. There are no authorized non-stormwater discharges from this site. Steps will be taken, including the implementation of appropriate BMPs, to ensure that unauthorized discharges are eliminated, controlled, disposed, or treated on-site.

Discharges of construction materials and wastes, such as fuel or paint, resulting from dumping, spills, or direct contact with rainwater or stormwater runoff, are also prohibited.

Page 670 of 1534 ends

CASQA Traditional SWPPP Template 2-7 March 2024
for the 2022 CGP

2.9 REQUIRED SITE MAP INFORMATION
The construction project’s Site Maps showing the project location, surface water boundaries, geographic features, construction site perimeter and general topography, locations of storm drain inlets that receive runoff from the project, and other requirements identified in 2022 CGP Sections IV.O.2. k. and l are located in Appendix A. Table 2-9 identifies Maps or Sheet Nos. where required elements are illustrated.

Table 2-9 Required Map Information
Included on
Map/Plan
Sheet No. (1)
Required Element
Pre-Earthwork Drawings
L0.0, L1.2, L1.3 Site and project boundaries
None Areas disturbed during geotechnical or other preconstruction investigation work
L1.2 Existing roads and trails
None Drainage areas
None Discharge locations
None Existing storm drain system if applicable
None Proposed locations of storage areas for waste
L1.2 Proposed locations of construction materials
L1.2 Proposed locations of project staging areas
None Proposed locations of stockpiles
L1.2 Proposed locations of vehicles, equipment staging and vehicle maintenance L1.2 Proposed locations of loading/unloading materials
L1.0 Proposed locations of site access (entrance/exits) None Proposed locations of fueling, water storage, water transfer for dust control None Proposed locations of demolition
None Proposed locations of other construction support activities Construction and Earthwork Drawing(s)
L1.3, L2.0 Site layout (grading plans) including roads
L0.0, L1.2, L1.3 Site and project boundaries
None Drainage areas
None Discharge locations
None Sampling locations
L1.3 Areas of soil disturbance (temporary or permanent)

Page 671 of 1534 ends

CASQA Traditional SWPPP Template 2-8 March 2024
for the 2022 CGP
Table 2-9 Required Map Information
Included on
Map/Plan
Sheet No. (1)
Required Element
L1.3 Proposed active areas of soil disturbance (cut or fill) L1.0 Proposed locations of erosion control BMPs
L1.0 Proposed locations of sediment control BMPs
L1.0 Proposed locations of run-off BMPs
None Temporary and/or permanent run-on conveyance (if applicable) None Proposed locations of active treatment systems(s) (if applicable) None Proposed locations of storage areas for waste
L1.2 Proposed locations of construction materials
L1.2 Proposed locations of project staging areas
None Proposed locations of stockpiles
L1.2 Proposed locations of vehicles, equipment and vehicle maintenance L1.2 Proposed locations of loading/unloading materials
L1.0 Proposed locations of site access (entrance/exits) None Proposed locations of fueling, water storage, water transfer for dust control None Proposed locations of demolition
None Proposed locations of other construction support activities L3.0, L4.0 Site-specific procedures to implement final stabilization BMPs as soon as reasonably practicable
Notes: (1) Indicate maps or drawings that information is included on (e.g., Vicinity Map, Site Map, Drainage Plans, Grading Plans, Progress Maps.)

Page 672 of 1534 ends

CASQA Traditional SWPPP Template 3-1 March 2024
for the 2022 CGP
Section 3 Best Management Practices

3.1 SCHEDULE FOR BMP IMPLEMENTATION
BMPs will be implemented as per the schedule indicated in Table 3-1.

Table 3-1 BMP Implementation Schedule
BMP Location Implementation Duration
Erosion
Control BMPs
EC-1, Scheduling Site-wide Prior to
Construction
Entire
project
EC-4, Hydroseed Site-wide Start of
Replanting
Segment
Completion
EC-15, Soil Preparation Site-wide Start of
Replanting
Segment
Completion
Sediment
Control
BMPs
SE-1, Silt Fence Site-wide Prior to
Construction
Entire
project
SE-5, Fiber Rolls Site-wide Prior to
Construction
Entire
project
Wind
Erosion
Control
BMPsNone needed
Tracking
Control
BMPs
TC-1, Stabilized
Construction Entrance
and Exit
Site entrance at
north end
Prior to
Construction
Entire
project
TC-3, Entrance Outlet
Tire Wash
Site entrance at
north end
Prior to
Construction
Entire
project
Non-Stormwater Control
BMPs
NS-1, Water
Conservation Practices Site-wide Prior to Construction
Entire
project
NS-6, Illicit
Connection/Discharge Site-wide Prior to Construction
Entire
project
NS-7, Potable
Water/Irrigation Site-wide Prior to Replanting
Segment
Completion
NS-8, Vehicle and
Equipment Cleaning
Site entrance at
north end of site
Prior to
Construction
Entire
project
NS-12, Concrete Curing
Overlook, Foot
Bridge Abutments,
Kiosk
Construction of
Kiosk
Segment
Completion
Cons
truct
ion
MateWM-01, Material
Delivery and Storage Site-wide Prior to Construction
Entire
project

Page 673 of 1534 ends

CASQA Traditional SWPPP Template 3-2 March 2024
for the 2022 CGP
Table 3-1 BMP Implementation Schedule
BMP Location Implementation Duration
WM-02, Material Use Site-wide Prior to
Construction
Entire
project
Waste
Management
Control BMPs
WM-04, Spill
Prevention & Control Site-wide Prior to Construction
Entire
project
WM-07, Contaminated
Soil Management Site-wide Prior to Hot Spot Removal
Segment
Completion
WM-08, Concrete
Waste Management Site-wide Prior to Kiosk Construction
Segment
Completion

3.2 EROSION AND SEDIMENT CONTROL
Erosion and sediment controls are required by the 2022 CGP to provide effective reduction or elimination of sediment related pollutants in stormwater discharges and authorized nonstormwater discharges from the Site. Applicable BMPs are identified in this section for erosion control, sediment control, tracking control, and wind erosion control.

3.2.1 Erosion Control
Erosion control, also referred to as soil stabilization, consists of source control measures that are designed to prevent soil particles from detaching and becoming transported in stormwater runoff. Erosion control BMPs protect the soil surface by covering and/or binding soil particles.

This construction project will implement the following practices to provide effective temporary and final erosion control during construction:

1. Preserve existing vegetation where required and when feasible.

2. The area of soil disturbing operations shall be controlled such that the Contractor is able to implement erosion control BMPs quickly and effectively.

3. Stabilize non-active areas within 14 days of cessation of construction activities or sooner if stipulated by local requirements.

4. Control erosion in concentrated flow paths by applying erosion control blankets, check dams, erosion control seeding, or alternate methods.

5. Prior to the completion of construction, apply permanent erosion control to remaining disturbed soil areas.

Sufficient erosion control materials shall be maintained onsite to allow implementation in conformance with this SWPPP.

The following erosion control BMP selection table, Table 3-2 indicates the BMPs that will be implemented to control erosion on the construction site. Fact Sheets for temporary erosion control BMPs are provided in Appendix G.

These temporary erosion control BMPs shall be implemented in conformance with the following guidelines and as outlined in the BMP Factsheets provided in Appendix G. If there is a conflict between documents, the Site Map will prevail over narrative in the body of the SWPPP or guidance in the BMP Fact Sheets. Site specific details in the Site Map prevail over standard

Page 674 of 1534 ends

CASQA Traditional SWPPP Template 3-3 March 2024
for the 2022 CGP
details included in the Site Map. The narrative in the body of the SWPPP prevails over guidance in the BMP Fact Sheets.

Page 675 of 1534 ends

CASQA Traditional SWPPP Template 3-4 March 2024
for the 2022 CGP
Table 3-2 Erosion Control BMPs
CASQA
Fact
Sheet
BMP Name
Considered
for the
Project(1)
BMP Used If not used, state reason and alternate BMP, if applicable YES NO
EC-1 Scheduling  
EC-2 Preservation of Existing
Vegetation   Non-native vegetation to be replaced with native vegetation; use EC-4 EC-3 Hydraulic Mulch (2)  Use EC-4
EC-4 Hydroseed (2) 
EC-5 Soil Binders (2)  Use EC-4
EC-6 Straw Mulch (2)  Use EC-4
EC-7 Geotextiles and Mats (2)  Use EC-4
EC-8 Wood Mulching (2)  Use EC-4
EC-9 Earth Dike and Drainage
Swales (3)  Not needed
EC-10 Velocity Dissipation Devices (3)  Not needed
EC-11 Slope Drains (3)  Not needed
EC-12 Stream Bank Stabilization  No work in the river
EC-14 Compost Blankets (2)  Use EC-4
EC-15 Soil Preparation-Roughening  
EC-16 Non-Vegetated Stabilization (2)  Project includes revegetation WE-1 Wind Erosion Control   Not needed
(1) The 2022 CGP Fact Sheet Section I.R.1.d. through I.R.1.i.describes various BMPs that should be considered for use on the construction site.
(2) The QSD shall ensure implementation of one of the minimum measures listed or a combination thereof to achieve and maintain the Risk Level requirements. (3) All run-on and runoff from the construction site shall be managed for Risk Level 2 and 3 and Risk Level 1 if the evaluation of quantity and quality of run-on and runoff deems them necessary or visual inspections show that the site requires these controls. Run-on from offsite shall be directed away from all disturbed areas, diversion of offsite flows may require design/analysis by a licensed civil engineer and/or additional environmental permitting.

Page 676 of 1534 ends

CASQA Traditional SWPPP Template
for the 2022 CGP 3-5 March 2024
Scheduling
The construction schedule will be from June 1, 2024, to October 14, 2024, to avoid the rainy season. In addition, no work will be conducted during and for 24 hours after a rain event.

Hydroseed
The hydroseed mixes to be used for revegetating the project site will consist of the mixes listed below. Sheet L3.0 in Appendix A shows where each mix will be placed. An irrigation system will be installed as shown on Sheet L4.0 in Appendix A.

Upland Seed Mix
• Bromus Carinatus / California Brome Seed 5%
• Calochortus Superbus / Yellow Mariposa Lily Seed 10%
• Calochortus Tolmiei / Tolmie Star Tulip Seed 10%
• Chlorogalum Pomeridianum / Soap Plant Seed 2.5%
• Clarkia Concinna Ssp. Concinna / Red Ribbons Seed 5%
• Clarkia Gracilis / Slender Clarkia Seed 5%
• Dichelostemma Capitatum Ssp. Capitatum / Blue Dicks Seed 5% • Elymus Glaucus / Blue Wildrye Seed 20%
• Eriogonum Nudum / Naked Buckwheat Seed
• Melica Californica / Melic Seed 10%
• Trifolium Fucatum / Bull Clover Seed 10%
• Trifolium Willdenovii / Tomcat Clover Seed 5%
• Triteleia Laxa / Ithuriel's Spear Seed 7.5%
Transitional Seed Mix
• Elymus Glaucus / Blue Wildrye Seed 10%
• Grindelia Stricta / Coastal Gum Plant Seed 10%
• Leymus Triticoides / Wild Rye Seed 40%
• Sisyrinchium Bellum / Blue-Eyed Grass Seed 5%
Wetland Seed Mix
• Bromus Carinatus Var. Carinatus / California Brome Seed 5% • Elymus Glaucus / Blue Wildrye Seed 5%
• Elymus Multisetus / Big Squirreltail Grass Seed 5%
• Eschscholzia Californica / California Poppy Seed 2.5% • Festuca Microstachys Var. Upland / Small Fescue Seed 5% • Helenium Bolanderi / Coastal Sneezeweed Seed 2.5%
• Hordeum Brachyantherum / Meadow Barley Seed 30%
• Lasthenia Californica / California Goldfields Seed 2.5% • Lupinus Bicolor / Miniature Lupine Seed 2.5%
• Sisyrinchium Bellum / Blue-Eyed Grass Seed 2.5%
• Trifolium Fucatum / Bull Clover Seed 2.5%
• Trifolium Microcephalum / Hairy Clover Seed 2.5%
Erosion Control Mix
• Bromus Carinatus / California Brome 25 lbs per acre
• Elymus Glaucus / Blue Wildrye 10 lbs per acre
• Festuca Microstachys / Small Fescue 6 lbs per acre

Page 677 of 1534 ends

CASQA Traditional SWPPP Template
for the 2022 CGP 3-6 March 2024
• Trifolium Willdenovii / Tomcat Clover 4 lbs per acre
Soil Preparation-Roughening
The three piles of concrete debris shown on Sheet L1.2 will be removed and will be recycled or disposed of at an offsite facility permitted to accept the materials. The one contaminated soil hot spot shown on Sheet L1.3 will be removed and will be disposed of at an offsite facility permitted to accept the materials.

The topography of the site will be graded to flatten the existing hummocky nature, as shown on Sheet L1.3. The two jurisdictional features (i.e., seasonal wetlands) will be cordoned off with silt fencing and will not be disturbed.

Following most of the debris and vegetation removal, rough grading would be implemented within approximately 3.39 acres of the site, including site recontouring to remove relic berms and realign site drainage. Some of the debris removal would need to occur following rough grading necessary to facilitate the removal. Approximately 0.42 acres of fine grading would occur in the upper terrace to redirect drainage away from the adjacent vineyard located to the west. As depicted on Sheet L1.3 n Appendix A, a series of berms and basins would be reconstructed on the site, designed to allow for seasonal off-channel habitat. To facilitate the reestablishment of seasonal wetlands on site, the project will place and compact a 2-inch base layer in re-contoured basins (in and below the 587 elevation contour). As the existing soils are degraded and do not support wetland vegetation, approximately 1,140 cubic yards of clay soil would be imported for this purpose. The site would be planted with ecologically appropriate wetland vegetation (as shown on Sheets L3.0 and L3.1 in Appendix A), with temporary irrigation to establish plantings (as shown on Sheets L4.0, L4.1, and L4.2 in Appendix A).

Inert soil moved during grading would be redistributed onsite at a location southeast of the park’s main parking lot (and south of the BMX track), which currently is used as overflow parking. Disturbed soils throughout the site would be stabilized and reseeded with ecologically appropriate grasses.

3.2.2 Sediment Controls
Sediment controls are temporary or permanent structural measures that are intended to complement the selected erosion control measures and reduce sediment discharges from active construction areas. Sediment controls are designed to intercept and settle out soil particles that have been detached and transported by the force of water.

The following sediment control BMP selection table indicates the BMPs that will be implemented to control sediment on the construction site. Fact Sheets for temporary sediment control BMPs are provided in Appendix G.

These temporary sediment control BMPs will be implemented in conformance with the following guidelines and in accordance with the BMP Fact Sheets provided in Appendix G. If there is a conflict between documents, the Site Map will prevail over narrative in the body of the SWPPP or guidance in the BMP Fact Sheets. Site specific details in the Site Map prevail over standard details included in the Site Map. The narrative in the body of the SWPPP prevails over guidance in the BMP Fact Sheets.

Page 678 of 1534 ends

CASQA Traditional SWPPP Template 3-7 March 2024
for the 2022 CGP
Table 3-3 Temporary Sediment Control BMPs
CASQA
Fact
Sheet
BMP Name
Considered
for the
Project(1)
BMP used
If not used, state reason and alternate
BMP, if applicable
YES NO
SE-1 Silt Fence (2) (3) 
SE-2 Sediment Basin
SE-3 Sediment Trap
SE-4 Check Dams
SE-5 Fiber Rolls (2)(3) 
SE-6 Gravel Bag Berm (3)  Use SE-1, SE-5
SE-7 Street Sweeping   Project not on or near streets SE-8 Sandbag Barrier
SE-9 Straw Bale Barrier
SE-10 Storm Drain Inlet Protection  RL2&3  Site does not have storm drains SE-11 ATS
SE-12
Manufactured Linear Sediment
Controls
SE-13 Compost Sock and Berm (3)  Use SE-1, SE-5
SE-14 Biofilter Bags (3)  Use SE-1, SE-5
NA Passive Treatment System
TC-1
Stabilized Construction Entrance and
Exit  
TC-2 Stabilized Construction Roadway
TC-3 Entrance Outlet Tire Wash 
(1) The 2022 CGPs Fact Sheet Section I.R.1.d through I.R.1.i describes various BMPs that should be considered for use on the construction site.
(2) The QSD shall ensure implementation of one of the minimum measures listed or a combination thereof to achieve and maintain the Risk Level requirements. (3) All run-on and runoff from the construction site shall be managed. Risk Level 2 and 3 shall provide linear sediment control along toe of slope, face of slope, and at the grade breaks of exposed slope.

Page 679 of 1534 ends

CASQA Traditional SWPPP Template 3-8 March 2024
for the 2022 CGP
Silt Fence
Silt fences will be installed at the locations shown on Sheet L1.0 in Appendix A. Details of silt fences are provided on Sheet L1.1 in Appendix A.

Fiber Rolls
Fiber rolls will be installed at the locations shown on Sheet L1.0 in Appendix A. Details of fiber rolls are provided on Sheet L1.1 in Appendix A.

Stabilized Construction Entrance and Exit
The location of the stabilized construction entrance and exit is shown on Sheet L1.0 in Appendix A. Details of the stabilized construction entrance and exit are provided on Sheet L1.1 in Appendix A.

Entrance Outlet Tire Wash
The stabilized construction entrance and exit is shown on Sheet L1.0 in Appendix A will also be used as a tire wash station.

3.3 NON-STORMWATER CONTROLS AND WASTE AND MATERIALS

MANAGEMENT

3.3.1 Non-Stormwater Controls
Non-stormwater discharges into storm drainage systems or waterways which are not authorized under the 2022 CGP are prohibited. Non-stormwater discharges for which a separate NPDES permit is required by the local Regional Water Board are prohibited unless coverage under the separate NPDES permit has been obtained for the discharge. The selection of non-stormwater BMPs is based on the list of construction activities with a potential for non-stormwater discharges identified in Section 2.7 of this SWPPP.

The following non-stormwater control BMP selection table indicates the BMPs that will be implemented to control sediment on the construction site. Fact Sheets for temporary nonstormwater control BMPs are provided in Appendix G.

Non-stormwater BMPs will be implemented in conformance with the following guidelines and in accordance with the BMP Fact Sheets provided in Appendix G. If there is a conflict between documents, the Site Map will prevail over narrative in the body of the SWPPP or guidance in the BMP Fact Sheets. Site specific details in the Site Map prevail over standard details included in the Site Map. The narrative in the body of the SWPPP prevails over guidance in the BMP Fact Sheets.

Page 680 of 1534 ends

CASQA Traditional SWPPP Template 3-9 March 2024
for the 2022 CGP
Table 3-4 Temporary Non-Stormwater BMPs
CASQA
Fact Sheet BMP Name
Considered
for the
Project (1)
BMP used If not used, state reason and alternate
BMP, if applicable YES NO
NS-1 Water Conservation Practices  
NS-2 Dewatering Operation   Dewatering will not be needed NS-3 Paving and Grinding Operation
NS-4 Temporary Stream Crossing
NS-5 Clear Water Diversion
NS-6 Illicit Connection/Discharge  
NS-7 Potable Water/Irrigation  
NS-8 Vehicle and Equipment Cleaning  
NS-9 Vehicle and Equipment Fueling   All fueling will occur at offsite facilities NS-10 Vehicle and Equipment Maintenance   All maintenance will occur at offsite facilities
NS-11 Pile Driving Operation
NS-12 Concrete Curing 
NS-13 Concrete Finishing
NS-14 Material and Equipment Use Over Water
NS-15 Demolition Removal Adjacent to Water
NS-16 Temporary Batch Plants
(1) The 2022 CGP Fact Sheet Section I.R.1.d through I.R.1.i describes various BMPs that should be considered for use on the construction site.

Page 681 of 1534 ends

CASQA Traditional Project SWPPP Template
for the 2022 CGP 3-10 March 2024
Water Conservation Practices
The irrigation system has been designed to provide only enough water to establish and support the plant mix described in Section 3.2.1. The irrigation system is described on Sheets 4.0 and 4.1

4.2 in Appendix A.

Illicit Connection/Discharge
The project includes the removal of three piles of concrete debris (discussed in Section 2.1.2 and shown Sheet L1.2) and one hot spot of contaminated soil (discussed in Section 2.1.5 and shown Sheet L1.3 in Appendix A). Workers will also be trained to watch for other debris or illicit connections.

Potable Water/Irrigation
The irrigation system has been designed to provide only enough water to establish and support the plant mix described in Section 3.2.1. The irrigation system is described on Sheets 4.0 and 4.1

4.2 in Appendix A.

Vehicle and Equipment Cleaning
The location of the stabilized construction entrance and exit is shown on Sheet L1.0 in Appendix A. Details of the stabilized construction entrance and exit are provided on Sheet L1.1 in Appendix A. The stabilized construction entrance and exit includes tire washing as identified on Sheet L1.1; Need description of this.

Concrete Curing
The four overlooks shown as Item S-101 on Sheet L2.0 with details on Sheet L2.1 in Appendix A will include a concrete curb and pad. Two kiosks shown as Item S-103 on Sheet L2.0 with details on Sheet L2.1 in Appendix A will be placed on a concrete pad. One prefabricated foot bridge shown as Item SS-101 on Sheet L2.0 with details on Sheet L2.2 in Appendix A will include concrete abutments.

3.3.2 Materials Management and Waste Management
Materials management control practices consist of implementing procedural and structural BMPs for handling, storing, and using construction materials to prevent the release of those materials into stormwater discharges. The amount and type of construction materials to be utilized at the Site will depend upon the type of construction and the length of the construction period. The materials may be used continuously, such as fuel for vehicles and equipment, or the materials may be used for a discrete period, such as soil binders for temporary stabilization.

Waste management consists of implementing procedural and structural BMPs for handling, storing, and ensuring proper disposal of wastes to prevent the release of those wastes into stormwater discharges.

Materials and waste management pollution control BMPs will be implemented to minimize stormwater contact with construction materials, wastes, and service areas; and to prevent materials and wastes from being discharged offsite. The primary mechanisms for stormwater contact that shall be addressed include:
• Direct contact with precipitation
• Contact with stormwater runon and runoff
A list of construction activities is provided in Section 2.6. The following Materials and Waste Management BMP selection table, Table 3-5, indicates the BMPs that shall be implemented to

Page 682 of 1534 ends

CASQA Traditional Project SWPPP Template
for the 2022 CGP 3-11 March 2024
handle materials and control construction site wastes associated with these construction activities. Fact Sheets for Materials and Waste Management BMPs are provided in Appendix G.

Material management BMPs will be implemented in conformance with the following guidelines and in accordance with the BMP Fact Sheets provided in Appendix G. If there is a conflict between documents, the Site Map will prevail over narrative in the body of the SWPPP or guidance in the BMP Fact Sheets. Site specific details in the Site Map prevail over standard details included in the Site Map. The narrative in the body of the SWPPP prevails over guidance in the BMP Fact Sheets.

Page 683 of 1534 ends

CASQA Traditional SWPPP Template 3-12 March 2024
for the 2022 CGP
Table 3-5 Temporary Materials Management BMPs
CASQA
Fact Sheet BMP Name Considered
for Project (1)
BMP used If not used, state reason and alternate BMP,
if applicable YES NO
WM-01 Material Delivery and
Storage  
WM-02 Material Use  
WM-03 Stockpile Management   The project does not include the use or need for stockpiles.

WM-04 Spill Prevention and Control  
WM-05 Solid Waste Management 
WM-06 Hazardous Waste
Management
  The project does not include the generation of
hazardous waste.

WM-07
Contaminated Soil
Management

WM-08 Concrete Waste
Management
 
WM-09 Sanitary-Septic Waste
Management
 
The adjacent Riverside Park has restrooms
connected to the City sanitary sewer. No onsite
sanitary waste facilities are needed.

WM-10 Liquid Waste Management   The project will not generate liquid waste. (1) The 2022 CGP Fact Sheet Section I.R.1.d through I.R.1.i describes various BMPs that should be considered for use on the construction site.

Page 684 of 1534 ends

CASQA Traditional SWPPP Template 3-13 March 2024
for the 2022 CGP
Material Delivery and Storage
Materials and equipment will be delivered to the staging area identified on Sheet L1.2 in Appendix A. Note that this area will be surrounded by a silt fence as shown on Sheet 1.0 in Appendix A. The materials would include clay topsoil, crushed granite for walkways, one pre-fabricated steel footbridge, wood for observation decks and benches, trash receptacles, interpretive signage, seeds for vegetation, irrigation piping and controls.

Material Use
The only material that could affect water quality would be the concrete used to create the foundation for the kiosk. A concrete washout area will be emplaced next to the construction access, as shown on Sheet L1.0 in Appendix A. Details of the concrete washout are shown in Detail 4 on Sheet L1.1 in Appendix A.

Spill Prevention and Control
All vehicles and equipment shall be in good working order. Vehicles and equipment observed to be leaking will not be allowed on the project site. Vehicles and equipment observed to be leaking onsite shall be immediately removed and repaired. Areas of fuel or oil leakage shall be cleaned up immediately and the contaminated materials properly disposed of. Fueling and maintenance of vehicles and equipment will be conducted at offsite facilities; no onsite fueling or maintenance will be allowed.

Contaminated Soil Management
Previous soil sampling at the site revealed one hot spot of soil contaminated with residual lead and pesticides at concentrations above regulatory action levels. About 228 cubic yards of contaminated soil will be disposed of at an offsite facility permitted to accept the waste (see Sheet L1.3 in Appendix A). The soil sampling report in Appendix Q provides further information regarding the contaminated soil.

Concrete Waste Management
A concrete washout station will be installed next to the stabilized construction entrance and exit is shown on Sheet L1.0 in Appendix A. Details of the concrete washout are shown in Detail 4 on Sheet L1.1 in Appendix A.

3.4 TMDL-RELATED BMPS
Bacteria TMDL BMPs:
o The QSP shall conduct training for construction site staff on routine housekeeping and sanitary waste management of identified sources of bacteria.

Chloride and Salts TMDL BMPs:
o No additional BMPs are identified for this pollutant category in the 2022 CGP.

Diazinon TMDL BMPs:
o No additional BMPs are identified for this pollutant category in the 2022 CGP.

Nutrient TMDL BMPs:
o No additional BMPs are identified for this pollutant category in the 2022 CGP.

Sediment TMDL BMPs:
o No additional BMPs are identified for this pollutant category in the 2022 CGP.

Page 685 of 1534 ends

CASQA Traditional SWPPP Template 3-14 March 2024
for the 2022 CGP
Temperature BMPs:
o No additional BMPs are identified for this pollutant category in the 2022 CGP.

Metals and Toxics TMDL BMPs:
o No additional BMPs are identified for this pollutant category in the 2022 CGP.

3.5 POST CONSTRUCTION STORMWATER MANAGEMENT MEASURES
Post construction BMPs are permanent measures installed during construction, designed to reduce or eliminate pollutant discharges from the site after construction is completed.

This site is subject to the post-construction requirements of an existing NPDES Phase I or Phase II MS4. ☐ Yes ☒ No
The following source control, site design, and treatment control post-construction BMPs to comply with 2022 CGP Section IV.N.3 have been identified for the site.

The Project includes site recontouring and revegetation with native plants to create about six acres of varied-elevation seasonal floodplain wetlands for storm water and floodwater retention, bio-infiltration, groundwater recharge, and native habitat. An earthen berm would be constructed to enhance wetlands, and new native wetland plantings would be installed. In addition, transitional planting and upland area planting with native trees, shrubs, grasses and annual plants would enhance upland areas. The Project’s upland area plantings are designed to incorporate ecologically-appropriate riparian plants, native to the local region of the Russian River, complying with the California Department of Water Resources (DWR) Model Water Efficient Landscape Ordinance (MWELO).

The Project would implement soil restoration to improve soil moisture retention and microbial balance and provide the essential foundation for restoring the site’s plant communities. Clay soil would be imported for this purpose, described in Section 2.1.5. This portion of the project would also focus on expanding the edge of the riparian forest and restoring site grasslands. The proposed planting plan for this restoration is depicted on Sheets L3.0 and L3.1 in Appendix A.

The proposed irrigation plan is depicted on Sheets 4.0, 4.1, and 4.2.

Completion of the planting and irrigation system would control post construction runoff through improved evapotranspiration by the improved vegetation, improved retention of stormwater for infiltration, and maintaining drainage internal to the project site through infiltration and drainage to the two seasonal (jurisdictional) wetlands internal to the project site.

A plan for the post construction funding and maintenance of these BMPs has been developed to address at minimum five years following construction. Through various partnerships with the Mendocino RCD, Peregrine Audubon, the Sanhedrin Chapter of the California Native Plant Society, the City will conduct ongoing management of the site to include community park patrol, bird walks, invasive plant removal, native plant maintenance, and site monitoring. The post construction plan described above will be funded and maintained as described in the Operations and Maintenance Plan that will be uploaded with the Notice of Termination.

Page 686 of 1534 ends

CASQA Traditional SWPPP Template 4-1 March 2024
for the 2022 CGP
Section 4 BMP Inspection and Maintenance

4.1 BMP INSPECTION AND MAINTENANCE
The 2022 CGP requires routine weekly inspections of BMPs, along with inspections before, during, and after qualifying precipitation events. A BMP inspection checklist must be filled out for inspections and maintained on-site with the SWPPP. The inspection checklist must include the necessary information covered in Section 7.6. A blank BMP Inspection Form can be found in Appendix H. Completed forms will be kept in Appendix N.

Maintenance, repair, or design and implementation of new BMPs alternatives will be begin withing 72 hours of the identification of failures or other shortcomings. Corrections will be completed as soon as possible, prior to the next forecasted precipitation event (2022 CGP Appendix D Section II.J).

The QSP will verify that all BMP maintenance and repairs were appropriately implemented during the next visual inspection following completion.

The QSP may delegate BMP maintenance and repair verification to an appropriately trained QSP Delegate.

Specific details for maintenance, inspection, and repair of Construction Site BMPs can be found in the BMP Factsheets in Appendix G.

Page 687 of 1534 ends

CASQA Traditional SWPPP Template 5-1 March 2024
for the 2022 CGP
Section 5 Training
Appendix J identifies the QSPs and QSP Delegates for the project. To promote stormwater management awareness specific for this project, periodic training of job-site personnel will be included as part of routine project meetings (e.g., daily/weekly tailgate safety meetings), or task specific training as needed. Refresher training will be provided as necessary.

The QSP will be responsible for providing this information at the meetings, and subsequently completing the Training Reporting Form shown in Appendix I, which identify the site-specific stormwater topics covered as well as the names of site personnel who attended the meeting.

The QSP may delegate specific tasks to trained QSP Delegates who have received the following training based on the guidelines developed by the Construction General Permit Training Team.

1. Foundational training for all QSP Delegate(s) regarding stormwater compliance roles and responsibilities, forecast information, and documentation and reporting procedures; and

2. Site-specific training regarding visual inspections, sampling procedures, and/or SWPPP and BMP implementation activities relevant to the responsibilities assigned to the QSP Delegate(s).

The delegate cannot perform the QSD and QSP inspections required in Section V.C.4 or Section V.D.2, respectively.

Documentation of training activities will be retained in Appendix I.

Page 688 of 1534 ends

CASQA Traditional SWPPP Template 6-1 March 2024
for the 2022 CGP
Section 6 Responsible Parties and Operators

6.1 RESPONSIBLE PARTIES
DAR(s) who are responsible for SWPPP implementation and have authority to sign permitrelated documents [is/are] listed below. The DAR(s) assigned to this project [is/are]:

Name Title Phone Number
QSD(s) identified for the project are identified in Appendix J. The QSD will have primary responsibility for assessing how construction activities will affect sediment transport, erosion, and other discharges of pollutants in stormwater runoff throughout the project. The QSD is required to revise the SWPPP to address potential problems identified by visual inspections, sampling data, comments from a QSP, or their own site observations. The QSD is required to perform the following on-site visual inspections:
• Within 30 days of construction activities commencing on site; • Within 30 days when a new QSD is assigned to the project; • Twice annually, once August through October and once January through March; • Within 14 calendar days after a numeric action level exceedance; and • Within the time period requested in writing from Regional Water Board staff.

QSPs and QSP Delegates identified for the project are identified in Appendix J. The QSP will have primary responsibility and significant authority for the implementation, maintenance, and inspection/monitoring of SWPPP requirements. The QSP will be available at all times throughout the duration of the project.

Duties of the QSP include but are not limited to:
• Implementing all elements of the 2022 CGP and SWPPP, including, but not limited to:
o Performing the following on-site visual inspections:
 One inspection per calendar month; other weekly inspections in the month can be delegated to a trained QSP Delegate under the specific direction of the QSP.
 Within 72 hours prior to a forecasted qualifying precipitation event, to inspect any areas of concern and to verify the status of any deficient BMPs, or other identified issues at the site. If extended forecast precipitation data (greater than 72 hours) is available from the National Weather Service, then the Pre-Precipitation Event inspection may be done up to 120 hours in advance.
 Within 14 days after a NAL exceedance, the QSP shall visually inspect the drainage area for exceedance and document any areas of concern.  Prior to the submittal for the NOT or COI (for acreage changes) for all or part of the site.
o Ensuring that all BMPs are implemented, inspected, and properly maintained;

Page 689 of 1534 ends

CASQA Traditional SWPPP Template 6-2 March 2024
for the 2022 CGP
o Ensure that the SMARTS generated WDID Number Notification form is posted onsite, in a location viewable by the public or readily available upon request, and the dates are correct and match the dates listed in SMARTS. • Implementing non-stormwater management, and materials and waste management activities such as: monitoring discharges; general Site clean-up; vehicle and equipment cleaning, fueling and maintenance; spill control; ensuring that no materials other than stormwater are discharged in quantities which will have an adverse effect on receiving waters or storm drain systems, etc.;
• Ensuring elimination of unauthorized discharges.
• The QSPs shall be assigned authority by the LRP to mobilize crews in order to make immediate repairs to the control measures.
• Coordinate with the Contractor(s) to assure the necessary corrections/repairs are made immediately and that the project complies with the SWPPP, the 2022 CGP, and approved plans at all times.
• Notifying the LRP or Duly Authorized Representative immediately of off-site discharges or other non-compliance events.
• Providing foundation and site-specific training to QSP Delegates and overseeing QSP Delegate work. Tasks that may be delegated to appropriately trained QSP-delegates include:
o Performing non-stormwater and stormwater visual observations and inspections; o Performing stormwater sampling and analysis, as required; and o Performing routine inspections and observations.

Table 6-1. QSP and QSP Delegate Authorized Inspections Weekly BMP and NSW Pre-QPE Daily-QPE Visual Inspections Post-QPE Visual Inspections Post NAL Exceedances Monthly BMP and NSW NOT

QSP X X X X X X X
QSP
Delegate X X X

Page 690 of 1534 ends

CASQA Traditional SWPPP Template 6-3 March 2024
for the 2022 CGP

6.2 CONTRACTOR LIST
Contractor Name:

Title:

Contractor Company:

Address
Phone Number:

Phone Number (24/7)
[Add additional rows, if
needed]

Page 691 of 1534 ends

CASQA Traditional SWPPP Template 7-1 March 2024
for the 2022 CGP
Section 7 Construction Site Monitoring Program

7.1 Purpose
This Construction Site Monitoring Program was developed to address the following objectives:

1. To demonstrate that the site is in compliance with the Discharge Prohibitions and Numeric Action Levels (NALs);

2. To determine whether non-visible pollutants discharged from the construction site and are causing or contributing to exceedances of water quality objectives;

3. To determine whether immediate corrective actions, additional BMP implementation, or SWPPP revisions are necessary to reduce pollutants in stormwater discharges and authorized non-stormwater discharges;

4. To determine whether BMPs included in the SWPPP are effective in preventing or reducing pollutants in stormwater discharges and authorized non-stormwater discharges.

7.2 Applicability of Permit Requirements
This project has been determined to be a Risk Level 2 project. The 2022 CGP identifies the following types of monitoring as being applicable for a Risk Level 2 project.

Risk Level 2
• Visual inspections of BMPs;
• Visual monitoring of the site related to qualifying precipitation events; • Visual monitoring of the site for non-stormwater discharges; • Sampling and analysis of construction site runoff, if any, for pH and turbidity; • Sampling and analysis of construction site runoff, if any, for non-visible pollutants identified during the pollutant source assessments when applicable; and • Sampling and analysis of construction site runoff, if any, as required by the Regional Water Board when applicable.

7.3. Weather and Precipitation Event Tracking
Visual monitoring and inspections requirements of the 2022 CGP are triggered by a Qualifying Precipitation Event. The 2022 CGP defines a Qualifying Precipitation Event as any weather pattern that is forecast to have a 50 percent or greater Probability of Precipitation (PoP) and a Quantitative Precipitation Forecast (QPF) of 0.5 inches or more within a 24-hour period. The event begins with the 24-hour period when 0.5 inches has been forecast and continues on subsequent 24-hour periods when 0.25 inches of precipitation or more is forecast.

7.3.1 Weather Tracking
The QSP should daily consult the National Oceanographic and Atmospheric Administration (NOAA) for the Forecast Weather Table Interface. These forecasts can be obtained at http://forecast.weather.gov. Weather reports should be printed and maintained with the SWPPP in Appendix M. Record the date and time the forecast was printed.

Page 692 of 1534 ends

CASQA Traditional SWPPP Template 7-2 March 2024
for the 2022 CGP

7.4 Monitoring Locations
The project site drains internally and does not directly drain to the Russian River. In the unlikely event that drainage from the construction site is discovered, monitoring locations will be selected based on the location of the drainage.

Whenever changes in the construction site might affect the appropriateness of sampling locations, the sampling locations shall be revised accordingly. All such revisions shall be implemented as soon as feasible and the SWPPP amended. Temporary changes that result in a one-time additional sampling location do not require a SWPPP amendment.

7.5 Safety and Monitoring Exemptions
Safety practices for sample collection will be in accordance with the [ENTER TITLE AND PUBLICATION DATE OF CONTRACTOR’S HEALTH AND SAFETY PLAN FOR THE PROJECT OR PROVIDE SPECIFIC REQUIREMENTS IN THIS SECTION]. A summary of the safety requirements that apply to sampling personnel is provided below. • List or state none [To be provided by contractor]
This project is not required to collect samples or conduct visual observations (inspections) under the following conditions (see Section III.B of the 2022 CGP):
• During dangerous weather conditions such as electrical storms, flooding, and high winds above 40 miles per hour;
• Outside of scheduled site operating hours; or
• When the site is not accessible to personnel. Scheduled site business hours are: 7 a.m. to 6 p.m., Monday through Friday.

If monitoring (visual monitoring or sample collection) of the site is unsafe because of the dangerous conditions noted above, then the QSP shall document the conditions for why an exception to performing the monitoring was necessary. The exemption documentation will be filed in Appendix N and must be included in the Annual Report.

7.6 Visual Monitoring
Per Section III.B.2. of Attachment D in the 2022 CGP, “For inactive projects, dischargers may reduce the visual inspection frequency and suspend sampling per Section III.G of the 2022 CGP.

Dischargers shall provide an explanation with supporting information for all missed visual inspections or sampling required by this Attachment, to be included in the Annual Report.” Visual monitoring includes observations and inspections. Inspections of BMPs are required to identify and record BMPs that need maintenance to operate effectively, that have failed, or that could fail to operate as intended. Visual observations of the site are required to observe storm water drainage areas to identify any spills, leaks, or uncontrolled pollutant sources.

Table 7-1 identifies the required frequency of visual observations and inspections. Inspections and observations will be conducted at the locations identified in Section 7.6.3.

Table 7-1 Summary of Visual Monitoring and Inspections
Type of Inspection Frequency
Routine Inspections1
BMP Inspections Weekly2

Page 693 of 1534 ends

CASQA Traditional SWPPP Template 7-3 March 2024
for the 2022 CGP
Table 7-1 Summary of Visual Monitoring and Inspections
Type of Inspection Frequency
Qualifying Precipitation Event Triggered Inspections
Site Inspections Prior to a Qualifying
Precipitation Event
Within 72 hours of a qualifying precipitation
event or up to 120 hours prior if supported
with forecast 2
BMP Inspections During an Extended
Qualifying Precipitation Event
Once every 24-hour period of a qualifying
precipitation event3
Site Inspections Following a Qualifying
Precipitation Event
Within 96 hours of a qualifying precipitation
event2
1 Inspections are required during scheduled site operating hours.

2.Most BMPs must be inspected weekly; those identified below must be inspected more frequently. 3 Inspections are required during scheduled site operating hours on days that the forecast predicts at least 0.25 inches of precipitation once the qualifying precipitation event commences.

7.6.1 Routine Observations and Inspections
Routine site inspections and visual monitoring are necessary to confirm that the project is in compliance with the requirements of the 2022 CGP.

7.6.1.1 Routine BMP Inspections
Inspections of BMPs are conducted to identify and record:
• BMPs that are properly installed;
• BMPs that need maintenance to operate effectively;
• BMPs that have failed; or
• BMPs that could fail to operate as intended.

7.6.1.2 Non-Stormwater Discharge Observations
Each drainage area will be inspected for the presence of or indications of prior unauthorized and authorized non-stormwater discharges. Inspections will record:
• Presence or evidence of any non-stormwater discharge (authorized or unauthorized); • Identification and elimination of unauthorized non-stormwater discharges • Pollutant characteristics (floating and suspended material, sheen, discoloration, turbidity, odor, etc.); and
• Source of discharge.

7.6.2 Qualifying Precipitation Event Triggered Observations and Inspections
Visual observations of the site and inspections of BMPs are required prior to a qualifying precipitation event; following a qualifying precipitation event, and every 24-hour period during a qualifying precipitation event. Pre-Qualifying Precipitation Event inspections will be

Page 694 of 1534 ends

CASQA Traditional SWPPP Template 7-4 March 2024
for the 2022 CGP
conducted after consulting NOAA and determining that a precipitation event with a 50 percent or greater PoP and a QPF of 0.5 inches or more precipitation within a 24-hour period has been predicted by the National Weather Service Forecast Office.

7.6.2.1 Visual Observations Prior to a Forecasted Qualifying Precipitation Event Within 72 hours prior to a qualifying precipitation event or up to 120 hours prior if extended forecast precipitation data is available, a stormwater visual monitoring site inspection will include observations of the following locations:
• All stormwater drainage areas to identify leaks, spills, or uncontrolled pollutant sources and when necessary, implement appropriate corrective actions. • All BMPs to identify whether they have been properly implemented per the SWPPP and implement appropriate corrective actions, as necessary. • All stormwater storage and containment areas to detect leaks and check for available capacity to prevent overflow.

The QSP must conduct the inspection prior to the qualifying precipitation event. Consistent with the requirements for a qualifying precipitation event, pre-rain BMP inspections and visual monitoring will be triggered by a NOAA forecast that indicates a 50 percent or greater probability of 0.5 inches of precipitation or more in a 24-hour period in the project area.

7.6.2.2 BMP Inspections During a Qualifying Precipitation Event During an extended qualifying precipitation event BMP inspections will be conducted at least once every 24 hours. Qualifying precipitation events are extended for each subsequent 24- hour period forecast to have at least 0.25 inches of precipitation. The BMP inspections are to identify and record:
• If BMPs were adequately designed, implemented and effective. • BMPs that require repair or replacement due to damage. • Additional BMPs that need to be implemented and revise the SWPPP accordingly.

If the construction site is not accessible during the rain event, the visual inspections shall be performed at all relevant outfalls, discharge points, downstream locations. The inspections should record any projected maintenance activities.

7.6.2.3 Visual Observations Following a Qualifying Precipitation Event Within 96 hours following the end of a qualifying precipitation event a stormwater visual monitoring site inspection is required to observe:
• If BMPs were adequately designed, implemented and effective. • BMPs that require repair or replacement due to damage. • Additional BMPs that need to be implemented and revise the SWPPP accordingly.

7.6.3 Visual Monitoring Procedures
Visual monitoring shall be conducted by the QSP or QSP Delegates.

The name(s) and contact number(s) of the QSPs or QSP Delegates assigned to conduct visual observations are listed below and their training qualifications are provided in Appendix J.

Assigned QSP: NAME OF INSPECTOR Contact phone: TELEPHONE NUMBER Assigned QSP Delegate: NAME OF INSPECTOR Contact phone: TELEPHONE NUMBER

Page 695 of 1534 ends

CASQA Traditional SWPPP Template 7-5 March 2024
for the 2022 CGP
Assigned QSP Delegate: NAME OF INSPECTOR Contact phone: TELEPHONE NUMBER Stormwater observations shall be documented on the Visual Inspection Field Log Sheet (see Appendix O). BMP inspections shall be documented on the site-specific BMP inspection checklist and include photographs of areas of concern along with the QSP’s description of the problem.

The QSP shall within 30 days of the inspection submit copies of the completed inspection report to the QSD.

The completed reports will be kept in Appendix N. Results of visual monitoring must be summarized and reported in the Annual Report.

7.6.4 Visual Monitoring Follow-Up and Reporting
Maintenance, repairs, and correction of deficiencies, including design changes to BMPs, identified by the observations or inspections, including required repairs or maintenance of BMPs, shall be initiated within 72 hours of identification and completed as soon as possible, prior to the next forecasted precipitation event.

When design changes to BMPs are required, the SWPPP shall be amended to reflect the changes.

Deficiencies identified in site inspection reports and correction of deficiencies will be tracked on the Inspection Field Log Sheet or BMP Inspection Report shall be kept in Appendix N. QSP Delegates shall report issues identified during inspections that require corrective action to the QSP within 24 hours of the observation.

The QSP shall within 30 days of the inspection submit copies of the completed Inspection Field Log Sheet or BMP Inspection Report with the corrective actions to the QSD.

Results of visual monitoring must be summarized and reported in the Annual Report.

7.6.5 Visual Monitoring Locations
The inspections and observations identified in Sections 7.6.1 and 7.6.2 will be conducted at the locations identified in this section. BMP locations are shown on Sheet L1.0 in Appendix A.

There are no drainage area(s) on the project site that directly drain to the Russian River from the contractor’s yard, staging areas, and storage areas. There are no stormwater storage or containment area(s) are on the project site from which stormwater will be dewatered. There are no discharge locations on the project site.

7.7 Water Quality Sampling and Analysis

7.7.1 Sampling and Analysis Plan for Non-Visible Pollutants in Stormwater Runoff Discharges
This Sampling and Analysis Plan for Non-Visible Pollutants describes the sampling and analysis strategy and schedule for monitoring non-visible pollutants in stormwater runoff discharges from the project site.

Sampling for non-visible pollutants, including those associated with TMDLs will be conducted when (1) a breach, leakage, malfunction, or spill is observed; and (2) the leak or spill has not been cleaned up prior to the rain event; and (3) there is the potential for discharge of non-visible pollutants to surface waters or drainage system.

Page 696 of 1534 ends

CASQA Traditional SWPPP Template 7-6 March 2024
for the 2022 CGP
Table 7-2 summarizes the potential non-visible pollutants identified in the pollutant source assessment in Sections 2.6 and 2.7 and the water quality constituent or indicator for that pollutant.

Table 7-2 Potential Non-Visible Pollutants and Water Quality Indicator Constituents Based on the Pollutant Source Assessment
Pollutant
Water Quality
Indicator or
Constituent
Source/Reason from
Pollutant Source
Assessment
TMDL
Pollutant
Site
Drainage
Area
Cement pH Construction Material or Waste No Internal
Sediment Turbidity Construction/Contractor
Activity Yes Internal
The project has the potential to receive stormwater run-on from the vineyards located adjacent and west of the project site. The run-on has the potential to contribute non-visible pollutants to stormwater discharges from the project.

7.7.1.1 Sampling Schedule
Samples for the potential non-visible pollutant(s) and a sufficiently large unaffected background sample shall be collected during the first eight hours of discharge from rain events that result in a sufficient discharge for sample collection. Samples shall be collected during the site’s scheduled hours and shall be collected regardless of the time of year and phase of the construction.

Collection of discharge samples for non-visible pollutant monitoring will be triggered only when any of the following conditions are observed during site inspections conducted prior to or during a rain event.
• Materials or wastes containing potential non-visible pollutants are not stored under watertight conditions. Watertight conditions are defined as (1) storage in a watertight container, (2) storage under a watertight roof or within a building, or (3) protected by temporary cover and containment that prevents stormwater contact and runoff from the storage area.
• Materials or wastes containing potential non-visible pollutants are stored under watertight conditions, but (1) a breach, malfunction, leakage, or spill is observed, (2) the leak or spill is not cleaned up prior to the rain event, and (3) there is the potential for discharge of non-visible pollutants to surface waters or a storm drain system. • A construction activity, including but not limited to those in Section 2.6, with the potential to contribute non-visible pollutants (1) was occurring during or within 24 hours prior to the rain event, (2) BMPs were observed to be breached, malfunctioning, or improperly implemented, and (3) there is the potential for discharge of non-visible pollutants to surface waters or a storm drain system.
• Soil amendments that have the potential to change the chemical properties, engineering properties, or erosion resistance of the soil have been applied, and there is the potential for discharge of non-visible pollutants to surface waters or a storm drain system.

Page 697 of 1534 ends

CASQA Traditional SWPPP Template 7-7 March 2024
for the 2022 CGP
• Stormwater runoff from an area contaminated by historical usage of the site has been observed to combine with stormwater runoff from the site, and there is the potential for discharge of non-visible pollutants to surface waters or a storm drain system.

7.7.1.2 Sampling Locations
Sampling locations are based on proximity to planned non-visible pollutant storage, occurrence or use, accessibility for sampling, and personnel safety. As previously noted, all drainage is internal to the project site; there is no direct drainage to the Russian River. Sampling locations, if any are needed, will be based on observations of the locations of discharge, if any.

If needed, one sampling location would be at the upstream part of the Russin River just adjacent to the upstream (north) edge of the project site. This location has been identified for the collection of an uncontaminated sample of runoff as a background sample for comparison with the samples being analyzed for non-visible pollutants. This location was selected such that the sample will not have come in contact with the operations, activities, or areas identified in Section 7.7.1 or with disturbed soils areas.

Table 7-3 Non-Visible Pollutant Sample Locations
Sample
Location
Identifier
Sample Location
Description
Sample Location
Latitude and
Longitude
(Decimal Degrees)
Runoff or Runon
Russian River -
Upstream Upstream of project site Latitude 39.144405
Longitude -123.181739
Background
Discharge
Location
Depends on discharge
location
Depends on discharge
location
Discharge
Russian River
Downstream Upstream of project site Latitude 39.142177
Longitude -123.180657
Runoff
If a stormwater visual monitoring site inspection conducted prior to or during a storm event identifies the presence of a material storage, waste storage, operations area with spills, or the potential for the discharge of non-visible pollutants to surface waters or a storm drain system that is at a location not listed above and has not been identified on the Site Maps, sampling locations will be selected by the QSP using the same rationale as that used to identify planned locations. Non-visible pollutant sampling locations shall be documented by the QSP on the pre-rain event inspection form prior to a forecasted qualifying precipitation event and the Effluent Sampling Field Log Sheet, which are provided in Appendix O.

7.7.1.3 Monitoring Preparation
Non-visible pollutant samples will be collected by:

QSP ☒ Yes ☐ No
QSP Delegate ☒ Yes ☒ No
An adequate stock of monitoring supplies and equipment for monitoring non-visible pollutants will be available on the project site prior to a sampling event. Monitoring supplies and

Page 698 of 1534 ends

CASQA Traditional SWPPP Template 7-8 March 2024
for the 2022 CGP
equipment will be stored in a cool temperature environment that will not come into contact with rain or direct sunlight. The QSP or QSP Delegates responsible for sampling will be available to collect samples in accordance with the sampling schedule. Supplies maintained at the project site will include, but are not limited to, clean powder-free nitrile gloves, sample collection equipment, coolers, appropriate number and volume of sample bottles, identification labels, re-sealable storage bags, paper towels, personal rain gear, ice, and Effluent Sampling Field Log Sheets and Chain of Custody (CoC) forms, which are provided in Appendix O.

7.7.1.4 Analytical Constituents
Table 7-4 lists the specific sources and types of potential non-visible pollutants based on the project pollutant source assessment and the water quality indicator constituent(s) for that pollutant. Table 7-4 provides the specific analytical methods and reporting limits for the potential non-visible pollutants. Analytical methods were selected in compliance with U.S. EPA sufficiently sensitive method requirements in 40 Code of Federal Regulations Part 136, as evidenced by the method detection limit and minimum level.

7.7.1.5 Sample Collection
Samples of discharge shall be collected at the designated non-visible pollutant sampling locations identified in Table 7-3 or in the locations determined by observed breaches, malfunctions, leakages, spills, operational areas, soil amendment application areas, and historical site usage areas that triggered the sampling event.

Grab samples shall be collected and preserved in accordance with the methods identified in Table 7-4, “Sample Collection, Preservation and Analysis for Monitoring Non-Visible Pollutants” provided in Section 7.7.1.6. Only the QSP, or QSP Delegates trained on sample collection identified in Section 7.7.1.3 shall collect samples. Sample collection and handling requirements are described in Section 7.7.7.

Page 699 of 1534 ends

CASQA Traditional SWPPP Template
for the 2022 CGP 7-9 March 2024
Table 7-4 Sample Collection, Preservation and Analysis for Monitoring Non-Visible Pollutants Constituent Analytical
Method
Minimum
Sample
Volume
Sample
Containers
Sample
Preservatio
n
Minimum
Level
Method
Detection
Limit
Maximum
Holding
Time
Turbidity Field Meter 500 mL
Polypropylene or
glass
(Do not collect in
meter sample
cells)
n/a 500 mL 1 NTUs n/a
pH Field Meter 100 mL Polypropylene n/a 100 mL 0.2 pH units n/a Fuels, Oils,
Lubricants, if
suspected
8015 40 mL Glass VOA vial Ice to 6
degrees C 40 mL
50 micrograms
per liter
7 days
Notes: Analytical laboratories may use the term Reporting Level in lieu of Minimum Level mL = milliliter NTU = Nephelometric Turbidity Unit

Page 700 of 1534 ends

CASQA Traditional SWPPP Template 7-10 March 2024
for the 2022 CGP

7.7.1.6 Sample Analysis
Samples shall be analyzed using the analytical methods identified in Table 7-4. Samples will be analyzed by:

Laboratory Name: McCampbell Analytical
Street Address: 1534 Willow Pass Road
City, State Zip: Pittsburg, CA 94565
Telephone Number: 925-252-9262
Point of Contact: Rosa Venegas
ELAP Certification
Number: 1644 (California) and 4033 (NELAP)
Samples will be delivered to the laboratory by:

Driven by QSP/QSP Delegate/Contractor ☒ Yes ☐ No
Picked up by Laboratory Courier ☒ Yes ☐ No
Shipped ☐ Yes ☒ No

7.7.1.7 Data Evaluation and Reporting
The QSP shall complete an evaluation of the water quality sample analytical results based on a comparison of the results to the unaffected sample and to the TMDL NALs.

Runoff/downgradient results shall be compared with the associated upgradient/unaffected results and any associated run-on results. Should the runoff/downgradient sample show an increased level of the tested analyte relative to the unaffected background sample, which cannot be explained by run-on results, the BMPs, site conditions, and surrounding influences shall be assessed to determine the probable cause for the increase.

As determined by the site and data evaluation, appropriate BMPs shall be repaired or modified to mitigate discharges of non-visible pollutant concentrations. Any revisions to the BMPs shall be recorded as an amendment to the SWPPP.

Analytical results of non-visible pollutant monitoring shall be submitted to SMARTS within 30 days of obtaining the analytical results. Results demonstrating an exceedance of an applicable TMDL-related NAL or Basin Plan parameter shall be submitted to SMARTS within 30 days of obtaining the analytical results.

The 2022 CGP prohibits stormwater discharges that contain hazardous substances equal to or in excess of reportable quantities established in 40 C.F.R. §§ 117.3 and 302.4. The results of any non-stormwater discharge results that indicate the presence of a hazardous substance in excess of established reportable quantities shall be immediately reported to the Regional Water Board and other agencies as required by 40 C.F.R. §§ 117.3 and 302.4.

The QSP shall compare the runoff sample results to the applicable TMDL NALs to determine whether the TMDL NALs have been exceeded, see Table 7-5.

Table 7-5 TMDL NAL and NEL Exceedances

Page 701 of 1534 ends

CASQA Traditional SWPPP Template 7-11 March 2024
for the 2022 CGP
Standard Exceedance Evaluation
TMDL NAL An exceedance occurs on the second, and each subsequent, analytical result for samples taken from any and all discharge location(s) within the same drainage area, during the same reporting year and taken in accordance with Attachment D Section III.D.3, that is above the concentration set forth in an applicable NAL.

In the event that the TMDL NAL is exceeded, the QSP shall immediately notify the LRP or DAR and investigate the cause of the exceedance and identify corrective actions.

The LRP or DAR shall electronically report all analytical results to the State Water Board by the through SMARTS within 30 days of receiving the results. Exceedances of TMDL NALs shall be electronically reported to the State Water Board by the LRP or DAR through SMARTS within 10 days of receiving the results.

If requested by the Regional Water Board in writing, a TMDL NAL Exceedance report will be submitted within 30 days of the request. The TMDL NAL Exceedance Report must contain the following information:
• Analytical method(s), method reporting unit(s), and Method Detection Limit(s) of each parameter;
• Date, place, time of sampling, visual observation, and/or measurements, including precipitation; and
• Description of the current BMPs associated with the sample that exceeded the TMDL NAL, a description of each corrective action taken including photographs, and date of implementation.

In the event of a TMDL NEL exceedance, by the end of each reporting year, project shall implement the following water quality based corrective actions:
• Conducting a site assessment to identify pollutant source(s) within the site that are associated with construction activity and whether the BMPs described in the SWPPP have been properly implemented;
• Evaluating the SWPPP and its implementation to determine whether additional BMPs or SWPPP implementation measures are necessary to reduce or prevent pollutants in all regulated discharges to comply applicable NELs, and
• Certifying and submitting through SMARTS a report of the above site assessment and SWPPP evaluation that:
o Additional BMPs or SWPPP implementation measures have been identified and included in the SWPPP, or
o No additional BMPs or SWPPP implementation measures are required to reduce or prevent pollutants in all regulated discharges to comply with applicable NELs.

7.7.2 Sampling and Analysis Plan for pH and Turbidity in Stormwater Runoff Discharges
Sampling and analysis of runoff for pH and turbidity is required for this Risk Level 2 project, in the event that runoff occurs. This Sampling and Analysis Plan describes the strategy for monitoring turbidity and pH levels of stormwater runoff discharges from the project site and run-on that may contribute to an exceedance of a Numeric Action Level (NAL). Samples for pH and turbidity will be collected at all discharge points where stormwater is discharged off-site.

Page 702 of 1534 ends

CASQA Traditional SWPPP Template 7-12 March 2024
for the 2022 CGP

7.7.2.1 Sampling Schedule
Stormwater runoff samples shall be collected for pH and turbidity from each day of a qualifying precipitation event that results in a discharge from the project site, in the event that discharge occurs. One sample from each discharge location will be collected each 24-hour period of active discharge during a qualifying precipitation event. Samples should be representative of the discharge flow and characteristics. Run-on samples shall be collected whenever the QSP identifies that run-on has the potential to contribute to an exceedance of a NAL.

7.7.2.2 Sampling Locations
Sampling locations are based on the site runoff discharge locations and locations where run-on enters the site, accessibility for sampling, and personnel safety. As previously noted, all drainage at the project site is internal; there are no direct discharge locations to the Russian River. Therefore, in the unlikely event of a discharge, pH and turbidity sampling locations, if any are needed, will be based on observations of the locations of run-on and run-off discharge, if any.

7.7.2.3 Monitoring Preparation
Turbidity and pH samples will be collected and analyzed by:

QSP [Name] ☒ Yes ☐ No
QSD Delegate [Name] ☒ Yes ☐ No
An adequate stock of monitoring supplies and equipment for monitoring turbidity and pH will be available on the project site prior to a sampling event. Monitoring supplies and equipment will be stored in a cool temperature environment that will not come into contact with rain or direct sunlight. The QSP or QSP Delegates will be available to collect samples in accordance with the sampling schedule. Supplies maintained at the project site will include, but are not limited to, field meters, extra batteries, clean powder-free nitrile gloves, sample collection equipment, appropriate sample containers, paper towels, personal rain gear, and Effluent Sampling Field Log Sheets and CoC forms provided in Appendix O.

The QSP or QSP Delegates will obtain and maintain the field-testing instruments, as identified in Section 7.7.2.6, for analyzing samples in the field. Field meter instructions are provided in Appendix P.

7.7.2.4 Field Parameters
Samples shall be analyzed for the constituents indicated in the Table 7-6.

Table 7-6 Sample Collection and Analysis for Monitoring Turbidity and pH Parameter Test Method
Minimum
Sample
Volume (1)
Sample Collection
Container Type
Detection
Limit
(minimum)
Turbidity
Field meter/probe with
calibrated portable
instrument
500 mL
Polypropylene or glass
(Do not collect in
meter sample cells)
1 NTU

Page 703 of 1534 ends

CASQA Traditional SWPPP Template 7-13 March 2024
for the 2022 CGP
Table 7-6 Sample Collection and Analysis for Monitoring Turbidity and pH Parameter Test Method
Minimum
Sample
Volume (1)
Sample Collection
Container Type
Detection
Limit
(minimum)
pH
Field meter/probe with
calibrated portable
instrument or calibrated
pH test kit
100 mL Polypropylene or glass 0.2 pH units
Notes: 1 Minimum sample volume recommended. Specific volume requirements will vary by instrument; check instrument manufacturer instructions.

L – Liter
mL – Milliliter
NTU – Nephelometric Turbidity Unit

7.7.2.5 Sample Collection
Samples of discharge shall be collected at runoff and run-on sampling locations based on the observed locations. Run-on samples shall be collected within close proximity of the point of run-on to the project. Sample collection and handling requirements are described in Section

7.7.7. 7.7.2.6 Field Measurements
The collection and analysis of samples for field analysis, collection, analysis and the calibration of equipment shall be in accordance with the field instrument manufacturer’s specifications.

Immediately following collection, samples for field analysis shall be tested in accordance with the field instrument manufacturer’s instructions and results recorded on the Effluent Sampling Field Log Sheet.

The field instrument(s) listed in Table 7-7 will be used to analyze the following constituents:

Table 7-7 Field Instruments
Field Instrument
(Manufacturer and Model) Constituent
YSI ProDSS or equivalent pH
YSI ProDSS or equivalent Turbidity
The manufacturers’ instructions are included in Appendix P. Field sampling staff shall review the instructions prior to each sampling event and follow the instructions in completing measurement of the samples.
• The instrument(s) shall be maintained in accordance with manufacturer’s instructions. • The instrument(s) shall be calibrated before each sampling and analysis event. • Maintenance and calibration records shall be maintained with the SWPPP.

Page 704 of 1534 ends

CASQA Traditional SWPPP Template 7-14 March 2024
for the 2022 CGP
The QSP may authorize alternate equipment provided that the equipment meets the 2022 CGP’s requirements and the manufacturers’ instructions for calibration and use are added to Appendix P.

7.7.2.7 Data Evaluation and Reporting
The LRP or DAR shall electronically report all stormwater pH and turbidity results to the State Water Board by the through SMARTS within 30 days of receiving the results. Exceedances of NALs shall be electronically reported to the State Water Board by the LRP or DAR through SMARTS within 10 days of receiving the results.

Numeric Action Levels
Compliance with the NALs for pH and turbidity is based on a single sample evaluation. A NAL exceedance occurs when any sample exceeds the turbidity NAL or is outside of the pH range shown in Table 7-8.

Table 7-8 Numeric Action Levels
Parameter Unit NAL
pH pH units Lower NAL < 6.5
Upper NAL > 8.5
Turbidity NTU >250
The QSP shall within 30 days of the sample collection submit copies of the completed Effluent Sampling Field Log Sheets to the LRP or DAR.

In the event that the pH or turbidity NAL is exceeded, the QSP shall immediately notify the LRP or DAR and investigate the cause of the exceedance and identify corrective actions.

Exceedances of NALs shall be electronically reported to the State Water Board by the LRP or DAR through the SMARTS within 10 days of the conclusion of the storm event.

If requested by the Regional Water Board in writing, a NAL Exceedance report will be submitted within 30 days of the request. The NAL Exceedance Report must contain the following information:
• Analytical method(s), method reporting unit(s), and Method Detection Limit(s) of each parameter;
• Date, place, time of sampling, visual observation, and/or measurements, including precipitation; and
• An assessment of the existing BMPs associated with the sample that exceeded the NAL, a description of each corrective action taken including photographs, and date of implementation.

Receiving Water Monitoring Triggers
This project is not subject to Receiving Water Monitoring Triggers because it does not directly discharge to a receiving water.

Page 705 of 1534 ends

CASQA Traditional SWPPP Template 7-15 March 2024
for the 2022 CGP

7.7.3 Sampling and Analysis Plan for pH and Turbidity in Receiving Water
This project is not subject to Receiving Water Monitoring. Receiving water monitoring is not required.

7.7.4 Sampling and Analysis Plan for Dewatering Discharges ☒ No dewatering activities are planned for this project. ☐ Dewatering activities planned for this project will be conducted and monitored according to the requirements of the following NPDES Permit: [insert name and order number of the permit.]
☐ Dewatering activities planned for this project will be conducted and monitored according to the requirements of the 2022 CGP Attachment J.

Page 706 of 1534 ends

CASQA Traditional SWPPP Template 7-16 March 2024
for the 2022 CGP

7.7.5 Sampling and Analysis Plan for Other Pollutants Required by the Regional Water Board
The Regional Water Board has not specified monitoring for additional pollutants.

7.7.6 Training of Sampling Personnel
QSP Delegates assigned to conduct sampling shall be trained by the QSP to collect, maintain, and ship samples in accordance with the 2022 CGP Sample Collection and Handling Instructions and supplemental information as needed. Training records of QSP Delegates assigned to sample are provided in Appendix I.

The QSP and QSP Delegates have received the following stormwater sampling training:

Name Training

INSERT LIST OF TRAINING COURSES

INSERT LIST OF TRAINING COURSES
The QSP and QSP Delegates have the following stormwater sampling experience:

Name Experience

INSERT LIST OF STORMWATER SAMPLING EXPERIENCE

INSERT LIST OF STORMWATER SAMPLING EXPERIENCE

7.7.7 Sample Collection and Handling

7.7.7.1 Sample Collection
Samples shall be collected at the sampling locations discussed in Sections 7.7.1.2 and 7.7.2.2.

Samples shall be collected, maintained and shipped in accordance with the 2022 CGP Sample Collection and Handling Instructions. Grab samples shall be collected and preserved in accordance with the methods identified in preceding sections. To maintain sample integrity and prevent cross-contamination, sample collection personnel shall follow the protocols below. • Collect samples (for laboratory analysis) in analytical laboratory-provided or specified sample containers;
o Use of any other type of containers could cause sample contamination and may result in NAL exceedances.
• Wear clean, powder-free nitrile gloves when collecting samples; • Change gloves whenever something not known to be clean has been touched; • Change gloves between sampling locations;
• Decontaminate all equipment (e.g., bucket, tubing) prior to sample collection; o using a trisodium phosphate water wash, distilled water rinse, and final rinse with distilled water..
o Dispose of wash and rinse water appropriately (i.e., do not discharge to storm drain or receiving water).
o Do not decontaminate laboratory provided sample containers; • Do not smoke during sampling events;
• Never sample near a running vehicle;

Page 707 of 1534 ends

CASQA Traditional SWPPP Template 7-17 March 2024
for the 2022 CGP
• Do not park vehicles in the immediate sample collection area (even non-running vehicles);
• Do not eat or drink during sample collection; and
• Do not breathe, sneeze, or cough in the direction of an open sample container.

The most important aspect of grab sampling is to collect a sample that represents the entire runoff stream. Typically, samples are collected by dipping the collection container in the runoff flow paths and streams as noted below.
i. For small streams and flow paths, simply dip the bottle facing upstream until full. ii. For larger stream that can be safely accessed, collect a sample in the middle of the flow stream by directly dipping the mouth of the bottle. Once again making sure that the opening of the bottle is facing upstream as to avoid any contamination by the sampler. iii. For larger streams that cannot be safely waded, pole-samplers may be needed to safely access the representative flow.
iv. Avoid collecting samples from ponded, sluggish or stagnant water. v. Avoid collecting samples directly downstream from a bridge as the samples can be affected by the bridge structure or runoff from the road surface.

Note, that depending upon the specific analytical test, some containers may contain preservatives. These containers should never be dipped into the stream but filled indirectly from the collection container.

7.7.7.2 Sample Handling
Turbidity and pH measurements must be conducted immediately. Do not store turbidity or pH samples for later measurement.

Samples for laboratory analysis must be handled as follows. Immediately following sample collection:
• Cap sample containers;
• Complete sample container labels;
• Place sealed containers in a re-sealable storage bag; • Place sample containers into an ice-chilled cooler;
• Document sample information on the Effluent Sampling Field Log Sheet (Appendix O); and
• Complete the CoC.

All samples for laboratory analysis must be maintained between 0-6 degrees Celsius during delivery to the laboratory. Samples must be kept on ice, or refrigerated, from sample collection through delivery to the laboratory. Place samples to be shipped inside coolers with ice. Make sure the sample bottles are well packaged to prevent breakage and secure cooler lids with packaging tape.

Ship samples that will be laboratory analyzed to the analytical laboratory right away. Hold times are measured from the time the sample is collected to the time the sample is analyzed. The 2022 CGP requires that samples be received by the analytical laboratory within 48 hours of the physical sampling (unless required sooner by the analytical laboratory to meet all hold times).

Laboratory Name: McCampbell Analytical
Street Address: 1534 Willow Pass Road
City, State Zip: Pittsburg, CA 94565

Page 708 of 1534 ends

CASQA Traditional SWPPP Template 7-18 March 2024
for the 2022 CGP
Telephone Number: 925-252-9262
Point of Contact: Rosa Venegas

7.7.7.3 Sample Documentation Procedures
All original data documented on sample container identification labels, Effluent Sampling Field Log Sheet (Appendix O), and CoCs shall be recorded using waterproof ink. These shall be considered accountable documents. If an error is made on an accountable document, the individual shall make corrections by lining through the error and entering the correct information. The erroneous information shall not be obliterated. All corrections shall be initialed and dated.

Duplicate samples shall be identified consistent with the numbering system for other samples to prevent the laboratory from identifying duplicate samples. Duplicate samples shall be identified in the Effluent Sampling Field Log Sheet.

Sample documentation procedures include the following:

Sample Bottle Identification Labels: Sampling personnel shall attach an identification label to each sample bottle. Sample identification shall uniquely identify each sample location. (These location identifiers should be listed in the tables in the SWPPP.) Field Log Sheets: Sampling personnel shall complete the Effluent Sampling Field Log Sheet and Receiving Water Sampling Field Log Sheet (Appendix O) for each sampling event, as appropriate.

Chain of Custody: Sampling personnel shall complete the CoC for each sampling event for which samples are collected for laboratory analysis. The sampler will sign the CoC (Appendix O) when the sample(s) is turned over to the testing laboratory or courier.

7.8 Active Treatment System Monitoring
Will an Active Treatment System (ATS) be deployed on the site? ☐ Yes ☒ No
This project does not require a project specific Sampling and Analysis Plan for an ATS because deployment of an ATS is not planned.

7.9 Passive Treatment Monitoring
Will passive treatment technologies be deployed on the site? ☐ Yes ☒ No
This project does not require a project specific Sampling and Analysis Plan for passive treatment because deployment of passive treatment is not planned.

7.10 Watershed Monitoring Option
This project is not participating in a watershed monitoring option.

7.11 Quality Assurance and Quality Control
An effective Quality Assurance and Quality Control (QA/QC) plan shall be implemented as part of the CSMP to ensure that analytical data can be used with confidence. QA/QC procedures to be initiated include the following:

Page 709 of 1534 ends

CASQA Traditional SWPPP Template 7-19 March 2024
for the 2022 CGP
• Field logs;
• Clean sampling techniques;
• CoCs;
• QA/QC Samples, if needed; and
• Data verification.

Each of these procedures is discussed in more detail in the following sections.

7.11.1 Field Logs
The purpose of field logs is to record sampling information and field observations during monitoring that may explain any uncharacteristic analytical results. Sampling information to be included in the field log include the date and time of water quality sample collection, sampling personnel, sample container identification numbers, and types of samples that were collected.

Field observations should be noted in the field log for any abnormalities at the sampling location (color, odor, BMPs, etc.). Field measurements for pH and turbidity should also be recorded in the field log. A Visual Inspection Field Log, an Effluent Sampling Field Log Sheet, [and a Receiving Water Sampling Field Log Sheet] are included in Appendix O.

7.11.2 Clean Sampling Techniques
Clean sampling techniques involve the use of certified clean containers for sample collection and clean powder-free nitrile gloves during sample collection and handling. As discussed in Section 7.7.7, adoption of a clean sampling approach will minimize the chance of field contamination and questionable data results.

7.11.3 Chain of Custody
The sample CoC is an important documentation step that tracks samples from collection through analysis to ensure the validity of the sample. Sample CoC procedures include the following:
• Proper labeling of samples;
• Use of CoC forms for all samples; and
• Prompt sample delivery to the analytical laboratory.

Analytical laboratories usually provide CoC forms to be filled out for sample containers. An example CoC is included in Appendix O.

7.11.4 QA/QC Samples
QA/QC samples provide an indication of the accuracy and precision of the sample collection; sample handling; field measurements; and analytical laboratory methods. The following types of QA/QC will be conducted for this project:
☒ Field Duplicates at a frequency of [5 percent or 1 duplicate minimum per sampling event]
(Required for all sampling plans with field measurements or laboratory analysis) ☐ Equipment Blanks at a frequency of [Insert frequency required by method] (Only needed if the equipment used to collect samples could add the pollutants to sample) ☐ Field Blanks at a frequency of [Insert frequency required by method] (Only required if sampling method calls for field blanks)

Page 710 of 1534 ends

CASQA Traditional SWPPP Template 7-20 March 2024
for the 2022 CGP
☐ Travel Blanks at a frequency of [One per sampling event] (Required for sampling plans that include VOC laboratory analysis)

7.11.4.1 Field Duplicates
Field duplicates provide verification of laboratory or field analysis and sample collection.

Duplicate samples shall be collected, handled, and analyzed using the same protocols as primary samples. The sample location where field duplicates are collected shall be randomly selected from the discharge locations. Duplicate samples shall be collected immediately after the primary sample has been collected. Duplicate samples must be collected in the same manner and as close in time as possible to the original sample.

7.11.4.2 Equipment Blanks
Equipment blanks provide verification that equipment has not introduced a pollutant into the sample. Equipment blanks are typically collected when:
• New equipment is used;
• Equipment that has been cleaned after use at a contaminated site; • Equipment that is not dedicated for surface water sampling is used; or • Whenever a new lot of filters is used when sampling metals.

7.11.4.3 Field Blanks
Field blanks assess potential sample contamination levels that occur during field sampling activities. De-ionized water field blanks are taken to the field, transferred to the appropriate container, and treated the same as the corresponding sample type during the course of a sampling event.

7.11.4.4 Travel Blanks
Travel blanks assess the potential for cross-contamination of volatile constituents between sample containers during shipment from the field to the laboratory. De-ionized water blanks are taken along for the trip and held unopened in the same cooler with the VOC samples.

7.11.5 Data Verification
After results are received from the analytical laboratory, the QSP or QSP Delegates shall verify the data to ensure that it is complete, accurate, and the appropriate QA/QC requirements were met. Data must be verified as soon as the data reports are received. Data verification shall include:
• Check the CoC and laboratory reports.

Make sure all requested analyses were performed and all samples are accounted for in the reports.
• Check laboratory reports to make sure hold times were met and that the reporting levels meet or are lower than the reporting levels agreed to in the contract. • Check data for outlier values and follow up with the laboratory.

Occasionally typographical errors, unit reporting errors, or incomplete results are reported and should be easily detected. These errors need to be identified, clarified, and corrected quickly by the laboratory. The QSP or QSP Delegates should especially note data that is an order of magnitude or more different than similar locations or is inconsistent with previous data from the same location.

Page 711 of 1534 ends

CASQA Traditional SWPPP Template 7-21 March 2024
for the 2022 CGP
• Check laboratory QA/QC results.

EPA establishes QA/QC checks and acceptable criteria for laboratory analyses. These data are typically reported along with the sample results. The QSP or QSP Delegates shall evaluate the reported QA/QC data to check for contamination (method, field, and equipment blanks), precision (laboratory matrix spike duplicates), and accuracy (matrix spikes and laboratory control samples). When QA/QC checks are outside acceptable ranges, the laboratory must flag the data, and usually provides an explanation of the potential impact to the sample results. • Check the data set for outlier values and, accordingly, confirm results and re-analyze samples where appropriate.

Sample re-analysis should only be undertaken when it appears that some part of the QA/QC resulted in a value out of the accepted range. Sample results may not be discounted unless the analytical laboratory identifies the required QA/QC criteria were not met and confirms this in writing.

Field data including inspections and observations must be verified as soon as the field logs are received, typically at the end of the sampling event. Field data verification shall include:
• Check field logs to make sure all required measurements were completed and appropriately documented;
• Check reported values that appear out of the typical range or inconsistent; Follow-up immediately to identify potential reporting or equipment problems, if appropriate, recalibrate equipment after sampling;
• Verify equipment calibrations;
• Review observations noted on the field logs; and
• Review notations of any errors and actions taken to correct the equipment or recording errors.

7.12 Records Retention
All records of stormwater monitoring information and copies of reports (including Annual Reports) must be retained for a period of at least three years from date of submittal or longer if required by the Regional Water Board. Results of visual monitoring, field measurements, and laboratory analyses must be kept in the SWPPP along with CoCs, and other documentation related to the monitoring. Records are to be kept onsite while construction is ongoing. Records to be retained include:
• The date, place, and time of inspections, sampling, visual observations, and/or measurements, including precipitation;
• The individual(s) who performed the inspections, sampling, visual observation, and/or field measurements;
• The date and approximate time of field measurements and laboratory analyses; • The individual(s) who performed the laboratory analyses; • A summary of all analytical results, the method detection limits and reporting limits, and the analytical techniques or methods used;
• Rain gauge readings from site inspections;
• QA/QC records and results;
• Calibration records;
• Visual observation and sample collection exception records; • The records of any corrective actions and follow-up activities that resulted from analytical results, visual observations, or inspections; • [NAL Exceedance Report].

Page 712 of 1534 ends

CASQA Traditional SWPPP Template 8-1 March 2024
for the 2022 CGP
Section 8 References
CASQA 2023. Stormwater BMP Handbook: Construction. Available online at: www.casqa.org Environmental Science Associates, 2020. Draft Hydrologic Analysis for the Ukiah Riverside Park Regeneration Project. November 2, 2022.

Environmental Science Associates, 2022. Soil Sampling Results Report, Proposed Ukiah Riverside Park, Ukiah, California. June 5, 2022.

Melton Design Group, 2023. Project Plans for the Construction of: Riverside Park Regeneration, 1281 East Gobbi Street, Ukiah, CA 95482. August 18.

SWRCB (State Water Resources Control Board), 2022. Order 2022-0057-DWQ, NPDES General Permit No. CAS000002: Stormwater Discharges Associated with Construction and Land Disturbing Activities. Available online at:
https://www.waterboards.ca.gov/water_issues/programs/stormwater/construction/general_pe rmit_reissuance.html.

Page 713 of 1534 ends

CASQA Traditional SWPPP Template A-1 March 2024
for the 2022 CGP
Appendix A: Site Maps and Drawings

Page 714 of 1534 ends

CASQA Traditional SWPPP Template B-1 March 2024
for the 2022 CGP
Appendix B: Permit Registration Documents
Permit Registration Documents included in this Appendix:

Location in
SWPPP
Permit Registration Document (in addition to a copy of
the SWPPP)
Appendix B Notice of Intent
Appendix B Risk Level Determination
Appendix B Certification
N/A Post-Construction Requirements, if applicable
N/A Post-Construction Water Balance Calculator, if applicable Appendix B Copy of Annual Fee Receipt
N/A ATS Design Documents, if applicable
N/A Passive Treatment Design Documents, if applicable
Appendix A Site Maps and Drawings, see Appendix A

Page 715 of 1534 ends

CASQA Traditional SWPPP Template C-1 March 2024
for the 2022 CGP
Appendix C: SWPPP Amendment QSD
Certifications

Page 716 of 1534 ends

CASQA Traditional SWPPP Template C-2 March 2024
for the 2022 CGP
SWPPP Amendment
No.

Project Name: Riverside Park Regeneration Project
Project Number:

Qualified SWPPP Developer’s Certification of the
Stormwater Pollution Prevention Plan Amendment
“This Stormwater Pollution Prevention Plan and its appendices were prepared under my direction to meet the requirements of the 2022 CGP (SWRCB Order No. 2022-0057-DWQ). I certify that I am a Qualified SWPPP Developer in good standing as of the date signed below.” QSD’s Signature Date
QSD Name QSD Certificate Number
Title and Affiliation Telephone
Address Email

Page 717 of 1534 ends

CASQA Traditional SWPPP Template D-1 March 2024
for the 2022 CGP
Appendix D: Submitted Changes of Information

Page 718 of 1534 ends

CASQA Traditional SWPPP Template D-2 March 2024
for the 2022 CGP
Log of Updated PRDs
The 2022 CGP allows for the reduction or increase of the total acreage when a portion of the project is complete and/or conditions for termination of coverage have been met; when ownership of a portion of the project is purchased by a different entity; or when new acreage is added to the project.

A Change of Information (COI) shall be filed electronically within the timeframe shown in the table below. The SWPPP shall be modified appropriately, with revisions and amendments recorded in the SWPPP Amendment Log at the front of the SWPPP. COIs submitted electronically via SMARTS can be found in this Appendix.

Reason for Filing COI Timeline for Filing COI
Reduction or increase in total disturbed area Within 30 days of the reduction or increase Updating site specific BMPs Within 14 days of design change Change construction start or end date At least 14 days prior to the date to be changed
Post-construction plans updated or approved
by the municipal stormwater permittee
Within 14 days of approval
This appendix includes all of the following updated PRDs (check all that apply):
☐ Change of Information;
☐ Revised Site Map;
☐ Revised Risk Assessment;
☐ New landowner’s information (name, address, phone number, email address); and ☐ New signed certification statement.

Signature of [Authorized Representative of] Legally
Responsible Person or Duly Authorized
Representative
Date
Name of [Authorized Representative of] Legally
Responsible Person or Duly Authorized
Representative
Telephone Number

Page 719 of 1534 ends

CASQA Traditional SWPPP Template E-1 March 2024
for the 2022 CGP
Appendix E: Construction Schedule
June 1, 2024, through October 14, 2024

Page 720 of 1534 ends

CASQA Traditional SWPPP Template F-1 March 2024
for the 2022 CGP
Appendix F: Construction Activities, Materials
Used, and Associated Pollutants

Page 721 of 1534 ends

CASQA Traditional SWPPP Template F-2 March 2024
for the 2022 CGP
Table F.1 Pollutant Source Assessment Form
Phase Activity Associated Materials or
Pollutants Pollutant Category (1)
Demolition and PreDevelopment Site Preparation Phase
Excavation & removal of
concrete debris
Fuels, oils & grease from
equipment
Sediment; oil and grease
Excavation & removal of
contaminated soil
Fuels, oils & grease from
equipment
Pesticides; sediment; oil
and grease
Grading and Land Development
Grading and excavation to
rework topography
Fuels, oils & grease from
equipment
Sediment; oil and grease
Streets and Utilities Phase
Installation of irrigation
system
Fuels, oils & grease from
equipment
Sediment; oil and grease
Vertical Construction Phase
None
Final Landscaping and Site Stabilization Phase
Planting of vegetation Fuels, oils & grease from
equipment
Sediment; oil and grease
(1) Categories per CASQA BMP Handbook (i.e., Sediment, Nutrients, Bacteria and Viruses, Oil and Grease, Metals, Synthetic Organics, Pesticides, Gross Pollutants, and Vector Production)

Page 722 of 1534 ends

CASQA Traditional SWPPP Template G-1 March 2024
for the 2022 CGP
Appendix G: CASQA Stormwater BMP Handbook:

Construction Fact Sheets

Page 723 of 1534 ends

CASQA Traditional SWPPP Template H-1 March 2024
for the 2022 CGP
Appendix H: BMP Inspection Form

Page 724 of 1534 ends

CASQA Traditional SWPPP Template H-2 March 2024
for the 2022 CGP

BMP INSPECTION REPORT
Date and Time of Inspection: Date Report Written:

Inspection Type:
(Circle one)
Weekly
Complete
Parts I,II,III
and VII
Pre-Qualifying
Precipitation
Event (QPE)
Complete Parts
I,II,III,IV and VII
During QPE
Complete Parts
I, II, III, V, and
VII
Post-QPE
Complete Parts
I,II,III,VI and VII
Inactive
Project
Complete
Parts I,II,III
and VII
Part I. General Information
Site Information
Construction Site Name: Riverside Park Regeneration Project Construction stage and
completed activities:

Approximate area
of site that is exposed:

Photos Taken:
(Circle one) Yes No
Photo Reference IDs:

Weather
Estimate storm beginning:
(date and time)
Estimate storm duration:
(hours)
Estimate time since last storm:
(days or hours)
Rain gauge reading and location:
(in)
Is a “Qualifying Precipitation Event” predicted or did one occur (i.e., any weather pattern with a 50% chance of

0.5” or more within a 24-hr period when 0.5” has been forecast and continues on subsequent 24-hour periods when 0.25” of precipitation or more is forecast)? (Y/N) If yes, summarize forecast:

Exception Documentation (explanation required if inspection could not be conducted). Visual inspections are not required outside of business hours or during dangerous weather conditions such as electrical storms, flooding, and high winds above 40 miles per hour.

Inspector Information
Inspector Name: Inspector Title:

Inspector Certification: Date:

Page 725 of 1534 ends

CASQA Traditional SWPPP Template H-3 March 2024
for the 2022 CGP
Part II. BMP Observations. Describe deficiencies in Part III.

Minimum BMPs for Risk Level __2___ Sites
Adequately
designed,
implemented
and effective
(yes, no, N/A)
Action
Required
(yes/no)
Action Implemented
(Date)
Good Housekeeping for Construction Materials
Inventory of products (excluding materials designed to be outdoors)
Stockpiled construction materials not actively in use are covered and bermed
All chemicals are stored in watertight containers with
appropriate secondary containment, or in a completely
enclosed storage shed
Construction materials are minimally exposed to precipitation BMPs preventing the off-site tracking of materials are
implemented and properly effective
Good Housekeeping for Waste Management
Wash/rinse water and materials are prevented from being disposed into the storm drain system
Portable toilets are contained to prevent discharges of waste Sanitation facilities are clean and with no apparent for leaks and spills
Equipment is in place to cover waste disposal containers at the end of business day and during rain events
Discharges from waste disposal containers are prevented from discharging to the storm drain system / receiving water Stockpiled waste material is securely protected from wind and rain if not actively in use
Procedures are in place for addressing hazardous and nonhazardous spills Appropriate spill response personnel are assigned and trained Equipment and materials for cleanup of spills is available onsite
Washout areas (e.g., concrete) are contained appropriately to prevent discharge or infiltration into the underlying soil Good Housekeeping for Vehicle Storage and Maintenance
Measures are in place to prevent oil, grease, or fuel from leaking into the ground, storm drains, or surface waters All equipment or vehicles are fueled, maintained, and stored in a designated area with appropriate BMPs
Vehicle and equipment leaks are cleaned immediately and disposed of properly

Page 726 of 1534 ends

CASQA Traditional SWPPP Template H-4 March 2024
for the 2022 CGP
Part II. BMP Observations Continued. Describe deficiencies in Part III.

Minimum BMPs for Risk Level ___2__ Sites
Adequately
designed,
implemented and
effective
(yes, no, N/A)
Action
Required
(yes/no)
Action Implemented
(Date)
Good Housekeeping for Landscape Materials
Stockpiled landscape materials such as mulches and topsoil are contained and covered when not actively in use
Erodible landscape material has not been applied 2 days before a forecasted rain event or during an event
Erodible landscape materials are applied at quantities and rates in accordance with manufacturer recommendations
Bagged erodible landscape materials are stored on pallets and covered
Good Housekeeping for Air Deposition of Site Materials
Good housekeeping measures are implemented onsite to
control the air deposition of site materials and from site operations
Non-Stormwater Management
Non-Stormwater discharges are properly controlled
Vehicles are washed in a manner to prevent non-stormwater discharges to surface waters or drainage systems
Streets are cleaned in a manner to prevent unauthorized nonstormwater discharges to surface waters or drainage systems.

Erosion Controls
Wind erosion controls are effectively implemented
Effective soil cover is provided for disturbed areas inactive (i.e., not scheduled to be disturbed for 14 days) as well as finished slopes, open space, utility backfill, and completed lots The use of plastic materials is limited in cases when a more sustainable, environmentally friendly alternative exists.

Sediment Controls
Perimeter controls are established and effective at controlling erosion and sediment discharges from the site
Entrances and exits are stabilized to control erosion and sediment discharges from the site
Sediment basins are properly maintained
Inspect immediate access roads prior to forecasted
precipitation
Linear sediment control along toe of slope, face of slope an at grade breaks (Risk Level 2 & 3 Only)
Limit construction activity to and from site to entrances and exits that employ effective controls to prevent offsite tracking (Risk Level 2 & 3 Only)
Ensure all storm, drain inlets and perimeter controls, runoff control BMPs and pollutants controls at entrances and exits

Page 727 of 1534 ends

CASQA Traditional SWPPP Template H-5 March 2024
for the 2022 CGP
are maintained and protected from activities the reduce their effectiveness (Risk Level 2 & 3 Only)
Run-On and Run-Off Controls
Run-on to the site is effectively managed and directed away from all disturbed areas.

Other
Are the project SWPPP and BMP plan up to date, available onsite and being properly implemented?
Is the posting of the project’s unique WDID number, waiver identification number, and site and project contact information publicly accessible?
Part III. Descriptions of BMP Deficiencies
Deficiency
Repairs Implemented:

Note - Repairs must begin within 72 hours of identification and, complete repairs as soon as possible.

Start Date Action

1. 2.

3. 4.

Part IV. Additional Pre-QPE Observations. Note the presence or absence of floating and suspended materials, sheen, discoloration, turbidity, odors, and source(s) of pollutants(s).

Yes, No, N/A
Do stormwater storage and containment areas have adequate freeboard? If no, complete Part III.

Are drainage areas free of spills, leaks, or uncontrolled pollutant sources? If no, complete Part VII and describe below.

Notes:

Are stormwater storage and containment areas free of leaks? If no, complete Parts III and/or VII and describe below.

Notes:

Page 728 of 1534 ends

CASQA Traditional SWPPP Template H-6 March 2024
for the 2022 CGP
Part V. Additional During-QPE Observations. If BMPs cannot be inspected during inclement weather, list the results of visual inspections at all relevant outfalls, discharge points, and downstream locations. Note odors or visible sheen on the surface of discharges. Complete Part VII (Corrective Actions) as needed.

Outfall, Discharge Point, or Other Downstream Location
Location Description
Location Description
Location Description
Location Description
Part VI. Additional Post-QPE Observations. Visually observe (inspect) stormwater discharges at all discharge locations within 96 hours after each qualifying precipitation event, and observe (inspect) the discharge of stored or contained stormwater that is derived from and discharged subsequent to a qualifying precipitation event producing precipitation of ½ inch or more at the time of discharge. Complete Part VII (Corrective Actions) as needed.

Discharge Location, Storage or
Containment Area
Visual Observation
Part VII. Additional Corrective Actions Required. Identify additional corrective actions not included with BMP Deficiencies (Part III) above. Note if SWPPP change is required.

Required Actions Implementation Date

Page 729 of 1534 ends

CASQA Traditional SWPPP Template I-1 March 2024
for the 2022 CGP
Appendix I: Training Forms

Page 730 of 1534 ends

CASQA Traditional SWPPP Template I-2 March 2024
for the 2022 CGP
Contractor Personnel Training Log
Stormwater Management Training Log and Documentation
Project Name: Riverside Park Regeneration Project
WDID #:

Stormwater Management Topic: (check as appropriate)
☐ Good Housekeeping BMPs ☐ Erosion Control BMPs
☐ Sediment Control BMPs ☐ Tracking Control
☐ Non-Stormwater Management BMPs ☐ Waste Management & Pollution Control BMPs ☐ BMP Implementation Activities ☐ Advanced BMPs
☐ Identification of QSPs and QSP Delegates
Training Objective:

Date: _ Instructor:

Training Length (hours):

Attendee Roster (Attach additional forms if necessary)
Name Company Phone

Page 731 of 1534 ends

CASQA Traditional SWPPP Template I-3 March 2024
for the 2022 CGP
QSP Delegate Training Log
Stormwater Management Training Log and Documentation
Project Name: Riverside Park Regeneration Project
WDID #:

QSP Delegate Name:

Delegated Responsibilities:
☐ Stormwater Visual Inspections
☐ Sampling
☐ BMP Inspections
☐ BMP Maintenance and Repair
Foundational Training
Topic Date Completed QSP Trainer
☐ Roles and Responsibilities
☐ Forecast Information
☐ Documentation and Reporting Procedures
Site-Specific Training
Topic Date Completed QSP Trainer
☐ Visual Inspections
☐ Sample Collection Procedures
☐ Sample Reporting Procedures
☐ BMP Implementation
As needed, attach proof of external training (e.g., course completion certificates, credentials for the QSP Delegate).

Page 732 of 1534 ends

CASQA Traditional SWPPP Template J-1 March 2024
for the 2022 CGP
Appendix J: Responsible Parties

Page 733 of 1534 ends

CASQA Traditional SWPPP Template J-2 March 2024
for the 2022 CGP
Identification of QSP and QSP Delegates
Project Name: Riverside Park Regeneration Project
WDID #:

The following are QSPs and QSP Delegates associated with this project Name of Personnel(1) QSP Number, or
state “Delegate”
Company Date
(1) If additional QSPs or QSP Delegates are required on the job site add additional lines

Page 734 of 1534 ends

CASQA Traditional SWPPP Template K-1 March 2024
for the 2022 CGP
Appendix K: Contractors and Subcontractors
Contractor Name:

Title:

Contractor Company:

Address
Phone Number:

Phone Number (24/7)
[Add additional rows, if
needed]

Page 735 of 1534 ends

CASQA Traditional SWPPP Template L-1 March 2024
for the 2022 CGP
Appendix L: Calculations

Page 736 of 1534 ends

CASQA Traditional SWPPP Template M-1 March 2024
for the 2022 CGP
Appendix M: Weather Reports
The discharger must obtain the precipitation forecast information from the National Weather Service Forecast Office (http://forecast.weather.gov ). A printed copy with the date and time of printing should be retained in this Appendix.

Page 737 of 1534 ends

CASQA Traditional SWPPP Template N-1 March 2024
for the 2022 CGP
Appendix N: Monitoring Records
Place completed BMP Inspection Forms, photographic documentation, Effluent Sampling, Receiving Water, and Dewatering Field Logs, Monitoring Exceptions, NAL Exceedance Reports, and Receiving Water Monitoring Trigger Exceptions in this appendix.

Page 738 of 1534 ends

CASQA Traditional SWPPP Template O-1 March 2024
for the 2022 CGP
Appendix O: Example Storm Event Monitoring
Forms

Page 739 of 1534 ends

CASQA Traditional SWPPP Template O-2 March 2024
for the 2022 CGP
Rain Gauge Log Sheet
Construction Site Name: Riverside Park Regeneration Project WDID #:

Date
(mm/dd/yy)
Time
(24-hr) Initials Rainfall Depth
(Inches) Notes:

Page 740 of 1534 ends

CASQA Traditional SWPPP Template O-3 March 2024
for the 2022 CGP
Risk Level 1, 2, 3
Visual Inspection Field Log Sheet
Date and Time of Inspection: Report Date:

Inspection Type: □ Weekly □ Pre Qualifying
Precipitation
Event (QPE)
□ During QPE □ Post QPE □ Dewatering
Discharge
Site Information
Construction Site Name: Riverside Park Regeneration Project Construction stage and
completed activities:

Approximate area
of exposed site:

Weather and Observations
Date Rain Predicted to Occur: Predicted % chance of precipitation (PoP):

Predicted quantity of precipitation (QPF):

Estimate storm beginning:
(date and time)
Estimate storm
duration:_________
(hours)
Estimate time since last
storm: ________
(days or hours)
Rain gauge
reading: _______
(inches)
Observations: If yes identify location
Odors Yes □ No □
Floating material Yes □ No □
Suspended Material Yes □ No □
Sheen Yes □ No □
Discolorations Yes □ No □
Turbidity Yes □ No □
Site Inspections
Outfalls or BMPs Evaluated Deficiencies Noted
(add additional sheets or attached detailed BMP Inspection Checklists) Photos Taken: Yes □ No □ Photo Reference IDs:

Corrective Actions Identified (note if SWPPP/REAP change is needed) Inspector Information
Inspector Name: Inspector Title:

Signature: Date:

Page 741 of 1534 ends

CASQA Traditional SWPPP Template O-4 March 2024
for the 2022 CGP
Risk Level 1, 2, 3
Effluent Sampling Field Log Sheets
Construction Site Name: Riverside Park Regeneration Project Date: Time Start:

Sampler:

Sampling Event Type: □ Stormwater □ Dewatering
Discharge
□ Non-visible pollutant
Field Meter Calibration
pH Meter ID No./Desc.:

Calibration Date/Time:

Turbidity Meter ID No./Desc.:

Calibration Date/Time:

Field pH and Turbidity Measurements
Discharge Location Description pH Turbidity Time
Grab Samples Collected
Discharge Location Description Sample Type Time
Additional Sampling Notes:

Time End:

Page 742 of 1534 ends

CASQA Traditional SWPPP Template O-5 March 2024
for the 2022 CGP
Risk Level 3
Receiving Water Sampling Field Log Sheets
Construction Site Name: Riverside Park Regeneration Project Date: Time Start:

Sampler:

Receiving Water Description and Observations
Receiving Water Name/ID:

Observations:

Odors Yes □ No □
Floating material Yes □ No □
Suspended Material Yes □ No □
Sheen Yes □ No □
Discolorations Yes □ No □
Turbidity Yes □ No □
Field Meter Calibration
pH Meter ID No./Desc.:

Calibration Date/Time:

Turbidity Meter ID No./Desc.:

Calibration Date/Time:

Field pH and Turbidity Measurements
Upstream Location
Type Result Time Notes
pH
Turbidity
Downstream Location
Type Result Time Notes
pH
Turbidity
Additional Sampling Notes:

Time End:

Page 743 of 1534 ends

CASQA Traditional SWPPP Template O-6 March 2024
for the 2022 CGP
NAL Exceedance Evaluation Summary Report Page __ of __
Project Name Riverside Park Regeneration Project
Project WDID
Project Location 1281 East Gobbi Street, Ukiah
Date of Exceedance
Type of Exceedance
NAL ☐ pH ☐ Turbidity
☐ Other (specify)
Measurement or
Analytical Method
☐ Field meter
(Sensitivity: )
☐ Lab method (specify)
(Minimum Level: )
(MDL: )
Calculated Daily
Average
☐ pH pH units
☐ Turbidity NTU
Rain Gauge
Measurement inches
Visual Observations
on Day of
Exceedance

Page 744 of 1534 ends

CASQA Traditional SWPPP Template O-7 March 2024
for the 2022 CGP
NAL Exceedance Evaluation Summary Report Page __ of __
Description of BMPs
in Place at Time of
Event
Initial Assessment
of Cause
Corrective Actions
Taken (deployed
after exceedance)
Additional
Corrective Actions
Proposed
Report Completed
By
(Print Name, Title)
Signature

Page 745 of 1534 ends

CASQA Traditional SWPPP Template O-8 March 2024
for the 2022 CGP
CHAIN-OF-CUSTODY DATE: Lab ID:

DESTINATION LAB:

REQUESTED
ANALYSIS Notes:

ATTN:

ADDRESS:

Office Phone:

Cell Phone:

SAMPLED BY:

Contact:

Project Name
Client Sample ID Sample Sample Sample Container
Date Time Matrix # Type Pres.

SENDER COMMENTS:

RELINQUISHED
BY
Signature:

Print:

Company:

Date: TIME:

LABORATORY COMMENTS: RECEIVED BY
Signature:

Print:

Company:

Date: TIME:

Page 746 of 1534 ends

CASQA Traditional SWPPP Template P-1 March 2024
for the 2022 CGP
Appendix P: Field Meter Instructions

Page 747 of 1534 ends

CASQA Traditional SWPPP Template Q-1 March 2024
for the 2022 CGP
Appendix Q: Supplemental Information

Page 748 of 1534 ends

CASQA Traditional SWPPP Template R-1 March 2024
for the 2022 CGP
Appendix R: Active Treatment System and
Passive Treatment Plans
No ATS or passive treatment systems will be used.

Page 749 of 1534 ends

CASQA Traditional SWPPP Template S-1 March 2024
for the 2022 CGP
Appendix S: Construction General Permit
Copies of the Construction Stormwater General Permit may be downloaded from the State Water Board website at:
http://www.waterboards.ca.gov/water_issues/programs/stormwater/construction.shtml.

Page 750 of 1534 ends

Appendix B

Page 751 of 1534 ends
Page 752 of 1534 ends
Page 753 of 1534 ends

|

Page 754 of 1534 ends

Ukiah Riverside Park Regeneration Project i ESA / 181242 Aquatic Resources Delineation Report July 2019
Preliminary  Subject to Revision

TABLE OF CONTENTS
Ukiah Riverside Park Regeneration Project
Aquatic Resources Delineation Report
Page
Chapter 1 ..................................................................................................................................1 Introduction..............................................................................................................................1

1.1 Purpose...................................................................................................................1

1.2 Location...................................................................................................................1

1.3 Responsible Parties ................................................................................................4

1.4 Directions to Site.....................................................................................................4 Chapter 2 ..................................................................................................................................7 Methods ....................................................................................................................................7

2.1 Pre-field Review......................................................................................................7

2.2 Field Survey Methods .............................................................................................7

2.3 Mapping and Acreage Calculations........................................................................8

2.4 Limitations ...............................................................................................................8 Chapter 3 ..................................................................................................................................9 Regulatory Setting...................................................................................................................9

3.1 2015 Clean Water Rule...........................................................................................9

3.2 Traditional Navigable Water..................................................................................12

3.3 Study Area ............................................................................................................13

3.4 Ephemeral, Intermittent, and Perennial Streams..................................................12 Chapter 4 ................................................................................................................................13 Setting.....................................................................................................................................13

4.1 Soils.......................................................................................................................13

4.2 Hydrology ..............................................................................................................15

4.3 Vegetation .............................................................................................................15 Chapter 5 ................................................................................................................................16 Results ....................................................................................................................................16

5.1 Aquatic Resources................................................................................................16

5.2 Clean Water Rule Analysis ...................................................................................18

5.3 Conclusions...........................................................................................................19 Chapter 6 ................................................................................................................................21 References..............................................................................................................................21

Page 755 of 1534 ends

Table of Contents
Page
Ukiah Riverside Park Regeneration Project ii ESA / 181242 Aquatic Resources Delineation Report July 2019
Preliminary  Subject to Revision
Appendices
A. Wetland Determination Data Forms
B. Plants Recorded at Data Points
C. Photographs
D. Aquatic Resources Spreadsheet
E. FEMA Flood Insurance Rate Map
F. City of Ukiah 1999 Memorandum
List of Figures
Figure 1 Regional Location ......................................................................................................2 Figure 2 Study Area..................................................................................................................3 Figure 3 Soils..........................................................................................................................14 Figure 4 Aquatic Resources ...................................................................................................17 List of Tables
Table 1 Aquatic Resources ....................................................................................................16 Table 2 Application of the 2015 Clean Water Rule to Aquatic Resources.............................19

Page 756 of 1534 ends

Ukiah Riverside Park Regeneration Project 1 ESA / 181242 Aquatic Resources Delineation Report July 2019
Preliminary  Subject to Revision
CHAPTER 1
Introduction
This report has been prepared to document the results and conclusions of an aquatic resources delineation field survey conducted for the Ukiah Riverside Park Regeneration Project (Project).

The Project is located in the City of Ukiah near the Russian River (Figure 1). The study area comprises phase 2 of Riverside Park. Phase 1 was constructed in approximately 2011. The study area was once the location of a City wastewater treatment facility, but has not been used for that purpose in decades. On behalf of Melton Design Group and the City of Ukiah, Environmental Science Associates (ESA) investigated the extent of aquatic resources in the study area that potentially meet the criteria for waters of the U.S.

This report documents the boundaries of the aquatic features within the study area using field data and the best professional judgment of ESA investigators. All conclusions presented should be considered preliminary and subject to change pending review and verification by the U.S. Army Corps of Engineers (USACE).

1.1 Purpose
The purpose of this investigation is to describe and delineate all potential wetlands and other waters of the U.S. within the study area that may be subject to Section 404 of the Clean Water Act. Information from this report may be used in preparing permit applications for future actions proposed in the study area.

1.2 Location
The approximately 8.6-acre study area is located at 1151 East Gobbi Street in the City of Ukiah, in Mendocino County. The study area is near phase 1 of Riverside Park, baseball fields, and a BMX track. The study area is on an unsectioned portion of the Ukiah, California U.S. Geological Survey (USGS) 7.5-minute series quadrangle corresponding to Township 15 north, Range 12 west of the Rancho Yokaya land grant. The approximate centroid of the study area is 39º 08′

36.94″ North, 123º 10′ 58.17″ West. Topography is flat except spoils piles and excavations related to the old wastewater treatment plant. Elevation ranges from approximately 570–587 feet.

The study area is in the floodplain of the Russian River (FEMA, 2019). An aerial photograph map of the study area is provided in Figure 2.

Page 757 of 1534 ends

Gobbi Street
Recreation Road
uR ssianRiver
Path: U:\gis\GIS\Projects\18xxxx\D181242_UkiahRiversidePark\Fig1_RegionalLocation_topo.aprx, ballen 6/20/2019 SOURCE: USGS, 1978; ESA, 2019. Ukiah Riverside Park Regeneration Project Figure 1
Regional Location
N
0 2,000
Feet
Copyright:© 2013 National Geographic Society, i-cubed
Study Area
Riverside Park
Study Area

Page 758 of 1534 ends

Gobbi Street
Recreation Road
u
R
s
s
ia
n
River
Path: U:\gis\GIS\Projects\18xxxx\D181242_UkiahRiversidePark\Fig2_WD_StudyArea.aprx, ballen 6/17/2019 SOURCE: DigitalGlobe,Oct. 2017; ESA, 2019. Ukiah Riverside Park Regeneration Project Figure 2
Study Area
N
0 300
Feet
Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User Community
Study Area

Page 759 of 1534 ends

1. Introduction
Ukiah Riverside Park Regeneration Project 4 ESA / 181242 Aquatic Resources Delineation Report July 2019
Preliminary  Subject to Revision

1.3 Responsible Parties
The owner is:

City of Ukiah
Department of Community Services
300 Seminary Avenue
Ukiah, CA 95482-5400
The point of contact for this report is:

Mr. Chuck Hughes, Senior Biologist/Botanist
Environmental Science Associates
2600 Capitol Avenue, Suite 200
Sacramento, CA 95816
(916) 564-4500
[email protected]

1.4 Directions to Site
Directions to the site from San Francisco:
 Take Highway 101 north about 110 miles.
 Take the Gobbi Street exit (exit 548b).
 Travel east on Gobbi Street for about 0.7 mile.
 Ukiah Riverside Park is at the gate at the east end of Gobbi Street.

Page 760 of 1534 ends

1. Introduction
Ukiah Riverside Park Regeneration Project 5 ESA / 181242 Aquatic Resources Delineation Report July 2019
Preliminary  Subject to Revision
This page intentionally left blank

Page 761 of 1534 ends
Page 762 of 1534 ends

Ukiah Riverside Park Regeneration Project 7 ESA / 181242 Aquatic Resources Delineation Report July 2019
Preliminary  Subject to Revision
CHAPTER 2
Methods

2.1 Pre-field Review
Prior to conducting fieldwork, the following background tasks were performed:
 Review of current and historic Ukiah, California U.S. Geologic Survey (USGS) topographic maps (USGS, 2019);
 Review of current and historic aerial photography (Google, Inc., 2019);  Review of the online soil survey (NRCS, 2019a) for information about soils and geomorphology;
 Review of the National Hydric Soils List (NRCS, 2019b) to determine if any soil mapping unit components are considered hydric;
 Review of the National Wetlands Inventory (U.S Fish and Wildlife Service [USFWS], 2019);  Review of the San Francisco USACE District Navigable Waterways (USACE, 1971); and  Review of the Federal Emergency Management Agency (FEMA) Flood Insurance Rate Map (FIRM) (FEMA, 2019).

2.2 Field Survey Methods
The fieldwork was conducted by ESA biologists Chuck Hughes and Elizabeth Hill on May 22, 2019. The delineation used the “Routine Determination Method” as described in the 1987 Corps of Engineers Wetland Delineation Manual (Environmental Laboratory, 1987), hereafter called the “1987 Manual.” The 1987 Manual was used in conjunction with the Regional Supplement to the Corps of Engineers Wetland Delineation Manual: Arid West Region (Version 2.0) (USACE, 2008), hereafter called the “Arid West Supplement.” For areas where the 1987 Manual and the Arid West Supplement differ, the Arid West Supplement was followed. In addition, the Guide to Ordinary High Water Mark (OHWM) delineation for non-perennial streams in the western mountains, valleys, and coast region of the United States (USACE, 2014) was used to identify the lateral limits of streams.

The Arid West Supplement is applicable for use at the site because the study area experiences hot, dry summers typical of a Mediterranean climate, and the surrounding landscape in the bottom of the valley is dominated by oaks (USACE, 2008). The study area is very near the boundary between the Arid West Region (LRR C) and the Western Mountains, Valleys, and Coast Region

Page 763 of 1534 ends

2. Methods
Ukiah Riverside Park Regeneration Project 8 ESA / 181242 Aquatic Resources Delineation Report July 2019
Preliminary  Subject to Revision
(LRR A). The Arid West Supplement was used for this delineation based on landscape, site conditions, vegetation, and climate. The Western Mountains, Valleys, and Coast Region OHWM guide was used for delineating the boundaries of other waters because that guide is more applicable than the Arid West OHWM Guide in the region of the study area.

Three positive parameters must normally be present for an area to be considered a wetland: 1) a dominance of wetland vegetation, 2) presence of hydric soils, and 3) presence of wetland hydrology. ESA assessed presence or absence of positive indicators for wetland vegetation, soils, and hydrology per the 1987 Manual and Arid West Supplement. Data points were recorded on Arid West wetland determination data forms (Appendix A).

At each data point, a visual assessment of the plant cover by species was made. Dominant species were assessed using the “50/20” rule per the Arid West Supplement. Plants were identified to species using The Jepson Manual: Vascular Plants of California, second edition (Baldwin et al., 2012). The Arid West 2016 Regional Wetland Plant List (Lichvar et al., 2016) was used to determine the wetland indicator status of all plants. Soils at each data point were characterized by color, texture, organic matter accumulation, and the presence or absence of hydric soil indicators.

Color was described using the Munsell Soil Color Book (Munsell Color, 2015). Presence of wetland hydrology was determined at each data point by presence of one or more of the primary and/or secondary indicators, per the Arid West Supplement.

For “other waters of the U.S.” to be considered jurisdictional, these features must exhibit a defined bed and bank and an OHWM.

2.3 Mapping and Acreage Calculations
All features, including data points, wetland boundaries, and OHWMs were recorded using a Global Positioning System (GPS) unit (Trimble GeoXT) with real-time differential correction and an instrument-rated mapping accuracy of +/- 1 meter. Boundaries of wetlands were demarcated in the field using GPS by walking the margin of the wetland and taking points at set intervals.

In the office, data from data points and wetland/waters boundaries were downloaded from the GPS unit and mapped using GIS software on an overlay of both topography and geo-referenced aerial photography. GPS-determined wetland/waters boundaries and data points were visually confirmed. Acreage of wetland and waters polygons, and the length of linear features were determined using ArcGIS.

2.4 Limitations
No problems or limitations were encountered.

Page 764 of 1534 ends

3. Regulatory Setting
Ukiah Riverside Park Regeneration Project 9 ESA / 181242 Aquatic Resources Delineation Report July 2019
Preliminary  Subject to Revision
CHAPTER 3
Regulatory Setting

3.1 2015 Clean Water Rule
In 2015, the USACE and the Environmental Protection Agency (EPA) issued the Clean Water Rule detailing the process for determining Clean Water Act (CWA) jurisdiction over waters of the U.S. The rule is currently in effect in California and 21 other states. The 2015 Clean Water Rule includes a detailed process for determining which areas may be subject to jurisdiction under the CWA, and defines features that are and are not waters of the U.S. Some features may need a significant nexus test to determine if they are a waters of the U.S.

The significant nexus test includes consideration of hydrologic and ecologic factors. The significant nexus test would take into account physical indicators of flow (evidence of an ordinary high water mark [OHWM]), if a hydrologic connection to a Traditional Navigable Water (TNW) exists, and if the aquatic functions of the water body have a significant effect (more than speculative or insubstantial) on the chemical, physical, and biological integrity of a TNW. A significant nexus test includes similarly situated waters in the region. The USACE and EPA will apply the significant nexus standard to assess the flow characteristics and functions of a potential WOTUS to determine if it significantly affects the chemical, physical, and biological integrity of the downstream TNW.
2015 Clean Water Rule Summary
The term “waters of the U.S.” is defined at 33 CFR (Code of Federal Regulations) 328.3(a) as:
(1) All waters which are currently used, were used in the past, or may be susceptible to use in interstate or foreign commerce, including all waters which are subject to the ebb and flow of the tide; (2) All interstate waters, including interstate wetlands; (3) The territorial seas;
(4) All impoundments of waters otherwise identified as waters of the United States under this section; (5) All tributaries, as defined in paragraph (c)(3) of this section, of waters identified in paragraphs (a)(1) through (3) of this section;
(6) All waters adjacent to a water identified in paragraphs (a)(1) through (5) of this section, including wetlands, ponds, lakes, oxbows, impoundments, and similar waters; (7) All waters in paragraphs (a)(7)(i) through (v) of this section where they are determined, on a case-specific basis, to have a significant nexus to a water identified in paragraphs (a)(1) through (3) of this section. The waters identified in each of paragraphs (a)(7)(i) through (v) of this section are similarly situated and shall be combined, for purposes of a significant nexus analysis, in the watershed that drains to the nearest water identified in paragraphs (a)(1) through (3) of this section. Waters identified in this paragraph shall not be combined with waters identified in paragraph (a)(6) of this section when performing a significant nexus analysis. If waters identified in this paragraph are also an adjacent water under paragraph (a)(6), they are an adjacent water and no case-specific significant nexus analysis is required.
(i) Prairie potholes. Prairie potholes are a complex of glacially formed wetlands, usually occurring in depressions that lack permanent natural outlets, located in the upper Midwest. (ii) Carolina bays and Delmarva bays. Carolina bays and Delmarva bays are ponded, depressional wetlands that occur along the Atlantic coastal plain.

Page 765 of 1534 ends

3. Regulatory Setting
Ukiah Riverside Park Regeneration Project 10 ESA / 181242 Aquatic Resources Delineation Report July 2019
Preliminary  Subject to Revision
(iii) Pocosins. Pocosins are evergreen shrub and tree dominated wetlands found predominantly along the Central Atlantic coastal plain.
(iv) Western vernal pools. Western vernal pools are seasonal wetlands located in parts of California and associated with topographic depression, soils with poor drainage, mild, wet winters and hot, dry summers. (v) Texas coastal prairie wetlands. Texas coastal prairie wetlands are freshwater wetlands that occur as a mosaic of depressions, ridges, intermound flats, and mima mound wetlands located along the Texas Gulf Coast.
(8) All waters located within the 100-year floodplain of a water identified in paragraphs (a)(1) through (3) of this section and all waters located within 4,000 feet of the high tide line or ordinary high water mark of a water identified in paragraphs (a)(1) through (5) of this section where they are determined on a case-specific basis to have a significant nexus to a water identified in paragraphs (a)(1) through (3) of this section. For waters determined to have a significant nexus, the entire water is a water of the United States if a portion is located within the 100-year floodplain of a water identified in paragraphs (a)(1) through (3) of this section or within 4,000 feet of the high tide line or ordinary high water mark. Waters identified in this paragraph shall not be combined with waters identified in paragraph (a)(6) of this section when performing a significant nexus analysis.

If waters identified in this paragraph are also an adjacent water under paragraph (a)(6), they are an adjacent water and no case-specific significant nexus analysis is required. 33 CFR 328.3(b) says:

The following are not ‘‘waters of the United States’’ even where they otherwise meet the terms of paragraphs (a)(4) through (8) of this section.
(1) Waste treatment systems, including treatment ponds or lagoons designed to meet the requirements of the Clean Water Act.
(2) Prior converted cropland. Notwithstanding the determination of an area’s status as prior converted cropland by any other Federal agency, for the purposes of the Clean Water Act, the final authority regarding Clean Water Act jurisdiction remains with EPA.
(3) The following ditches:
(i) Ditches with ephemeral flow that are not a relocated tributary or excavated in a tributary. (ii) Ditches with intermittent flow that are not a relocated tributary, excavated in a tributary, or drain wetlands. (iii) Ditches that do not flow, either directly or through another water, into a water identified in paragraphs (a)(1) through (3) of this section.
(4) The following features:
(i) Artificially irrigated areas that would revert to dry land should application of water to that area cease; (ii) Artificial, constructed lakes and ponds created in dry land such as farm and stock watering ponds, irrigation ponds, settling basins, fields flooded for rice growing, log cleaning ponds, or cooling ponds; (iii) Artificial reflecting pools or swimming pools created in dry land; (iv) Small ornamental waters created in dry land;
(v) Water-filled depressions created in dry land incidental to mining or construction activity, including pits excavated for obtaining fill, sand, or gravel that fill with water; (vi) Erosional features, including gullies, rills, and other ephemeral features that do not meet the definition of tributary, non-wetland swales, and lawfully constructed grassed waterways; and (vii) Puddles.
(5) Groundwater, including groundwater drained through subsurface drainage systems. (6) Stormwater control features constructed to convey, treat, or store stormwater that are created in dry land. (7) Wastewater recycling structures constructed in dry land; detention and retention basins built for wastewater recycling; groundwater recharge basins; percolation ponds built for wastewater recycling; and water distributary structures built for wastewater recycling.

The following terms are defined in 33 CFR 328.3(c):
(1) Adjacent. The term adjacent means bordering, contiguous, or neighboring a water identified in paragraphs (a)(1) through (5) of this section, including waters separated by constructed dikes or barriers, natural river berms, beach dunes, and the like. For purposes of adjacency, an open water such as a pond or lake includes any wetlands within or abutting its ordinary high water mark. Adjacency is not limited to waters located laterally to a water identified in paragraphs (a)(1) through (5) of this section. Adjacent waters also include all waters that connect

Page 766 of 1534 ends

3. Regulatory Setting
Ukiah Riverside Park Regeneration Project 11 ESA / 181242 Aquatic Resources Delineation Report July 2019
Preliminary  Subject to Revision
segments of a water identified in paragraphs (a)(1) through (5) or are located at the head of a water identified in paragraphs (a)(1) through (5) of this section and are bordering, contiguous, or neighboring such water. Waters being used for established normal farming, ranching, and silviculture activities (33 U.S.C. 1344(f)) are not adjacent.
(2) Neighboring. The term neighboring means:
(i) All waters located within 100 feet of the ordinary high water mark of a water identified in paragraphs (a)(1) through (5) of this section. The entire water is neighboring if a portion is located within 100 feet of the ordinary high water mark;
(ii) All waters located within the 100-year floodplain of a water identified in paragraphs (a)(1) through (5) of this section and not more than 1,500 feet from the ordinary high water mark of such water. The entire water is neighboring if a portion is located within 1,500 feet of the ordinary high water mark and within the 100- year floodplain;
(iii) All waters located within 1,500 feet of the high tide line of a water identified in paragraphs (a)(1) or (a)(3) of this section, and all waters within 1,500 feet of the ordinary high water mark of the Great Lakes. The entire water is neighboring if a portion is located within 1,500 feet of the high tide line or within 1,500 feet of the ordinary high water mark of the Great Lakes.
(3) Tributary and tributaries. The terms tributary and tributaries each mean a water that contributes flow, either directly or through another water (including an impoundment identified in paragraph (a)(4) of this section), to a water identified in paragraphs (a)(1) through (3) of this section that is characterized by the presence of the physical indicators of a bed and banks and an ordinary high water mark. These physical indicators demonstrate there is volume, frequency, and duration of flow sufficient to create a bed and banks and an ordinary high water mark, and thus to qualify as a tributary. A tributary can be a natural, man-altered, or man-made water and includes waters such as rivers, streams, canals, and ditches not excluded under paragraph (b) of this section. A water that otherwise qualifies as a tributary under this definition does not lose its status as a tributary if, for any length, there are one or more constructed breaks (such as bridges, culverts, pipes, or dams), or one or more natural breaks (such as wetlands along the run of a stream, debris piles, boulder fields, or a stream that flows underground) so long as a bed and banks and an ordinary high water mark can be identified upstream of the break. A water that otherwise qualifies as a tributary under this definition does not lose its status as a tributary if it contributes flow through a water of the United States that does not meet the definition of tributary or through a non-jurisdictional water to a water identified in paragraphs (a)(1) through (3) of this section. (4) Wetlands. The term wetlands means those areas that are inundated or saturated by surface or groundwater at a frequency and duration sufficient to support, and that under normal circumstances do support, a prevalence of vegetation typically adapted for life in saturated soil conditions. Wetlands generally include swamps, marshes, bogs, and similar areas.
(5) Significant nexus. The term significant nexus means that a water, including wetlands, either alone or in combination with other similarly situated waters in the region, significantly affects the chemical, physical, or biological integrity of a water identified in paragraphs (a)(1) through (3) of this section. The term ‘‘in the region’’ means the watershed that drains to the nearest water identified in paragraphs (a)(1) through (3) of this section. For an effect to be significant, it must be more than speculative or insubstantial. Waters are similarly situated when they function alike and are sufficiently close to function together in affecting downstream waters.

For purposes of determining whether or not a water has a significant nexus, the water’s effect on downstream paragraph (a)(1) through (3) waters shall be assessed by evaluating the aquatic functions identified in paragraphs (c)(5)(i) through (ix) of this section. A water has a significant nexus when any single function or combination of functions performed by the water, alone or together with similarly situated waters in the region, contributes significantly to the chemical, physical, or biological integrity of the nearest water identified in paragraphs (a)(1) through (3) of this section. Functions relevant to the significant nexus evaluation are the following:
(i) Sediment trapping,
(ii) Nutrient recycling,
(iii) Pollutant trapping, transformation, filtering, and transport, (iv) Retention and attenuation of flood waters,
(v) Runoff storage,
(vi) Contribution of flow,
(vii) Export of organic matter,
(viii)Export of food resources, and
(ix) Provision of life cycle dependent aquatic habitat (such as foraging, feeding, nesting, breeding, spawning, or use as a nursery area) for species located in a water identified in paragraphs (a)(1) through (3) of this section.
(6) Ordinary high water mark. The term ordinary high water mark means that line on the shore established by the fluctuations of water and indicated by physical characteristics such as a clear, natural line impressed on the bank,

Page 767 of 1534 ends

3. Regulatory Setting
Ukiah Riverside Park Regeneration Project 12 ESA / 181242 Aquatic Resources Delineation Report July 2019
Preliminary  Subject to Revision
shelving, changes in the character of soil, destruction of terrestrial vegetation, the presence of litter and debris, or other appropriate means that consider the characteristics of the surrounding areas. (7) High tide line. The term high tide line means the line of intersection of the land with the water’s surface at the maximum height reached by a rising tide. The high tide line may be determined, in the absence of actual data, by a line of oil or scum along shore objects, a more or less continuous deposit of fine shell or debris on the foreshore or berm, other physical markings or characteristics, vegetation lines, tidal gages, or other suitable means that delineate the general height reached by a rising tide. The line encompasses spring high tides and other high tides that occur with periodic frequency but does not include storm surges in which there is a departure from the normal or predicted reach of the tide due to the piling up of water against a coast by strong winds such as those accompanying a hurricane or other intense storm.

The limits of jurisdiction are identified in 33 CFR 328.4 as:
(a) Territorial Seas. The limit of jurisdiction in the territorial seas is measured from the baseline in a seaward direction a distance of three nautical miles. (See 33 CFR 329.12) (b) Tidal Waters of the United States. The landward limits of jurisdiction in tidal waters:
(1) Extends to the high tide line, or
(2) When adjacent non-tidal waters of the United States are present, the jurisdiction extends to the limits identified in paragraph (c) of this section.
(c) Non-Tidal Waters of the United States. The limits of jurisdiction in non-tidal waters:
(1) In the absence of adjacent wetlands, the jurisdiction extends to the ordinary high water mark, or (2) When adjacent wetlands are present, the jurisdiction extends beyond the ordinary high water mark to the limit of the adjacent wetlands.
(3) When the water of the United States consists only of wetlands the jurisdiction extends to the limit of the wetland.

3.2 Traditional Navigable Water
Navigable waters of the United States are defined in 33 CFR § 329.4 as “…those waters that are subject to the ebb and flow of the tide and/or are presently used, or have been used in the past, or may be susceptible for use to transport interstate or foreign commerce. A determination of navigability, once made, applies laterally over the entire surface of the waterbody, and is not extinguished by later actions or events which impede or destroy navigable capacity.” Traditional navigable waters include all of the “navigable waters of the United States” as defined in 33 CFR § Part 329.4 as well as by numerous decision of the federal courts; those water bodies the USACE has determined are a navigable water of the U.S. pursuant to 33. CFR § 329.14; plus all other waters that are navigable-in-fact. The definition of “navigable-in-fact” comes from a long line of court cases originating with Daniel Ball, 77 U.S. 557 (1870).

3.3 Ephemeral, Intermittent, and Perennial Streams
An ephemeral stream has flowing water only during, and for a short duration after, precipitation events in a typical year. Ephemeral stream beds are located above the water table year-round.

Groundwater is not a source of water for the stream. Runoff from rainfall is the primary source of water for stream flow. An intermittent stream has flowing water during certain times of the year, when groundwater provides water for stream flow. During dry periods, intermittent streams may not have flowing water. Runoff from rainfall is a supplemental source of water for stream flow. A perennial stream has flowing water year-round during a typical year (82 Federal Register 1860).

Page 768 of 1534 ends

4. Setting
Ukiah Riverside Park Regeneration Project 13 ESA / 181242 Aquatic Resources Delineation Report July 2019
Preliminary  Subject to Revision
CHAPTER 4
Setting

4.1 Study Area
The study area is in a valley of the Russian River, in the inner North Coast Range. The Russian River is approximately 150 feet east of the study area. There is a corridor of riparian vegetation along the river outside the study area. The study area is located on a flood terrace of the river.

Most of the terrace is used for agriculture, primarily vineyards and pear orchards. The natural vegetation is valley oak woodland.

The study area is at the site of the former City wastewater treatment facility. The former treatment facility is no longer present and was likely removed between 1958 and 1975 (USGS, 2019). Other portions of the former treatment facility are now used for baseball fields, a BMX track, and phase 1 of Ukiah Riverside Park. The study area has experienced substantial ground disturbance in the past as a result of the former treatment facility. Topography is mostly level except for artificial excavations and spoils piles.

The climate in the region consists of cool, wet winters and hot, dry summers. The mean annual precipitation in Ukiah is 37.35 inches and mean annual temperatures range from an average maximum temperature of 73.5 degrees Fahrenheit to an average minimum temperature of 43.6 degrees Fahrenheit (Western Regional Climate Center, 2019; NWSFO, 2019). Precipitation from July 1, 2018 through May 22, 2019 totaled 43.67 inches, which is 119% of the average annual rainfall for that period (NWSFO, 2019). Ukiah received over three inches of precipitation in the week preceding the field work (NWSFO, 2019).

4.2 Soils
The soil map (Figure 3) indicates two soil map units in the study area (NRCS, 2019a). A brief description of each primary soil within each map unit is provided below. All colors refer to moist soil. Both soil map units are listed as hydric where the necessary landform occurs (flood-plains; NRCS, 2019b).

Russian loam, 0–2% slopes. Russian soils formed in alluvium from sedimentary rocks and occur on flood plains and low stream terraces. They are well-drained, with moderate permeability and slow runoff, with occasional flooding. A typical profile of Russian loam has:
0–38 inches Very dark grayish brown (10YR 3/2) neutral loam. 38–65 inches Very dark grayish brown (10YR 3/2) neutral very fine sandy loam.

Page 769 of 1534 ends

236
217
188
Path: u:\GIS\GIS\projects\18xxxx\D181242_UkiahRiversidePark\Fig3_WD_Soils.aprx, ballen 6/19/2019 SOURCE: DigitalGlobe, Oct. 2017; SSURGO, 2018; ESA, 2019. Ukiah Riverside Park Regeneration Project Figure 3
Soils
N
0 150
Feet
Source: Esri, DigitalGlobe, GeoEye, Earthstar
Geographics, CNES/Airbus DS, USDA, USGS,
AeroGRID, IGN, and the GIS User Community
ID - Soil Map Unit
188 - Russian Loam (0-2% slopes)
217 - Xerofluvents (0-2% slopes)
236 - Water
Study Area
Soil Map Unit Boundary

Page 770 of 1534 ends

4. Setting
Ukiah Riverside Park Regeneration Project 15 ESA / 181242 Aquatic Resources Delineation Report July 2019
Preliminary  Subject to Revision
Xerofluvents, 0–2% slopes. These soils are on flood plains along rivers or streams or on alluvial fans with a Mediterranean (xeric) moisture regime. Flooding may occur in winter. The vegetation on xerofluvents is commonly mixed forest or grass and shrubs (NRCS 1999).

4.3 Hydrology
The entire study area is in the watershed of the upper Russian River (HUC 1801011004). As discussed previously, the study area is located within the floodplain of the river, and the river is approximately 150 feet east of the study area. There are no traditional navigable waters in or near the study area. The lowest reach of the Russian River is considered a traditional navigable water from Vacation Beach approximately 13.6 miles downstream to the mouth of the river (USACE, 1971). The study area experiences flooding from the nearby Russian River during times of high water.

4.4 Vegetation
Plant communities are assemblages of plant species that occur together in the same area, and are defined by species composition and relative abundance. The entire study area has experienced substantial soil disturbance in the past and vegetation is mostly dominated by nonnative ruderal species. The northern end of the study area contains old spoils piles of asphalt that are covered largely with nonnative invasive Himalayan blackberry (Rubus armeniacus) with some native shrubs including coyote brush (Baccharis pilularis) and blue elderberry (Sambucus nigra ssp. caerulea). The southern end of the study area is dominated by nonnative annual grasses including wild oat (Avena fatua), rye grass (Festuca perennis), and bromes (Bromus spp.). Vegetation in seasonal wetlands is described in Chapter 5.1. A list of plant species recorded at data points is in Appendix B. Representative photographs of the study area are in Appendix C.

Page 771 of 1534 ends

5. Results
Ukiah Riverside Park Regeneration Project 16 ESA / 181242 Aquatic Resources Delineation Report July 2019
Preliminary  Subject to Revision
CHAPTER 5
Results

5.1 Aquatic Resources
The aquatic resources delineation identified 0.178 acre of aquatic resources within the study area, consisting of two seasonal wetlands. Aquatic resources were classified using the Classification of Wetlands and Deepwater Habitats of the United States (“Cowardin Classification”) (FGDC, 2013). Details of the wetlands are provided in Table 1 and described below. Figure 4 shows the location and extent of the wetlands. The Aquatic Resources Spreadsheet is in Appendix D.

TABLE 1

AQUATIC RESOURCES
Map ID Wetland Type – Cowardin Classification Total Acres Wetlands
SW-1 Seasonal Wetland – Palustrine, Emergent, Seasonally Flooded (PEMC) 0.140 SW-2 Seasonal Wetland – Palustrine, Emergent, Seasonally Flooded (PEMC) 0.038 Wetland Total: 0.178
Grand Total: 0.178
SOURCE: ESA 2019

5.1.1 Wetlands
Seasonal Wetland 1
Seasonal wetland (SW) 1 is in the bottom of an artificially excavated pit (Appendix C, Photo 2).

During the time of the survey, SW-1 had hydrophytic vegetation dominated by rye grass (Festuca perennis; FAC) and dock (Rumex sp.; at least FACW). A few willows (Salix sp.) and cottonwoods (Populus fremontii ssp. fremontii) grow along the margin of SW-1. Soils were clearly disturbed from previous activities in the study area. Nevertheless, a horizon at six inches met the redox dark surface indicator. The soil was saturated one inch below the surface at data point 1, and a few other areas within SW-1 had surface water ponded to a depth of up to a few inches.

Page 772 of 1534 ends

Russian
River
SW-1
(0.140 ac.)
SW-2
(0.038 ac.)
Stormwater
Culvert Outfall
DP-1
DP-2
DP-4 DP-3
DP-5
DP-6
DP-7
DP-8
DP-9
DP-10
DP-11
DP-12
590
580
580
590
590
590
590
590
590
590
590
590
590
590
590
590
590
590
590
590
590
590
590
590
Path: U:\gis\GIS\Projects\18xxxx\D181242_UkiahRiversidePark\Fig4_WD_Wetlands.aprx, ballen 6/19/2019 SOURCE: DigitalGlobe, Oct. 2017; ESA, 2019. Ukiah Riverside Park Regeneration Project Figure 4
Aquatic Resources
N
0 100
Feet
Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User Community
Study Area - 8.603 ac.

Data Point
Contour (2')
Seasonal Wetland - 0.178 ac. 1 inch = 100 feet
Delineation conducted by Chuck Hughes and Elizabeth Hill (ESA).

Map prepared by Brad Allen (ESA) on Jun 17, 2019
&
&

Page 773 of 1534 ends

5. Results
Ukiah Riverside Park Regeneration Project 18 ESA / 181242 Aquatic Resources Delineation Report July 2019
Preliminary  Subject to Revision
There are two sources of hydrology for SW-1. The first is surface water runoff from uplands that collects in the bottom of the pit. The second is from flood events of the Russian River. When the water surface elevation of the river reaches approximately 589 feet, water will flow through an eroded gully, away from the river, and into the pit. The bottom of the pit is approximately 574 feet in elevation. The sides of the gully are eroding into an old dirt road (Appendix C, photo 5), and sediment consisting of gravel and sand is splayed into the bottom of the pit. There is no splay of sediment on the river-side of the gully. There is no clear, natural line on the side of the gully indicating an ordinary high water mark. Water will only flow through the gully during flood events. In years in which the river reaches a sufficient flood elevation, SW-1 may be inundated to a depth and for a duration much longer than in other years where upland precipitation runoff is the sole source of hydrology. The base flood elevation (1% chance of being equaled or exceeded in a given year) is approximately 593.5 feet (Appendix E).

Seasonal Wetland 2
SW-2 is in the bottom of an artificially excavated ditch (Appendix C, photo 7). The ditch begins at a culvert outfall that discharges stormwater during rainfall events. The ditch outfalls into the Russian River, although the ditch loses a distinctive bottom and banks near the River. There is no indication from historic topographic maps that the ditch is a relocated tributary (USGS, 2019).

The bottom of the ditch is not uniformly sloped. The western end of the ditch does not fully drain and may retain water up to several inches deep. During the survey, SW-2 had hydrophytic vegetation and soils similar to SW-1. Hydrology indicators were fine sediments on the bottom few inches of plant stems and the FAC-neutral test.

5.2 Clean Water Rule Analysis
Table 2 summarizes the application of the clean water rule to the aquatic resources in the study area.

5.2.1 Seasonal Wetland 1
The pit containing SW-1 was dug for the purpose of gravel extraction. While the pit is located at the former wastewater treatment facility that once operated in the study area, it was dug as a source of gravel. The City of Ukiah noted in a 1999 memorandum (Appendix F) that a longtime City Employee indicated the pit “was a naturally occurring gravel deposit that the City excavated.”
33 CFR 328.3(b)(4)(v) excludes pits excavated in dry land for obtaining gravel that fill with water as waters of the U.S. Such features are not waters of the U.S., even where they include wetlands that would otherwise meet the terms of paragraphs (a)(4) through (a)(8). The pit was dug in the floodplain of the Russian River, but the area surrounding the pit is uplands. The pit was dug in dry land, for the purpose of gravel extraction, and hence is not a waters of the U.S.

Page 774 of 1534 ends

5. Results
Ukiah Riverside Park Regeneration Project 19 ESA / 181242 Aquatic Resources Delineation Report July 2019
Preliminary  Subject to Revision

5.2.2 Seasonal Wetland 2
SW-2 is in the bottom of an excavated ditch. The ditch is not a relocated tributary or excavated in a tributary. There are no tributaries shown in the study area on any of the USGS (2019) topographic maps, including the oldest one reviewed from 1957. The ditch flows ephemerally during precipitation events. The ditch receives flow from the outfall of a City stormwater culvert and conveys stormwater from the culvert outfall to the Russian River. 33 CFR 328.3(b)(3)(i) excludes as waters of the U.S. ditches with ephemeral flow that are not a relocated tributary or excavated in a tributary. The ditch meets this definition. 33 CFR 328.3(b)(6) excludes as waters of the U.S. stormwater control features constructed to convey stormwater that are created in dry land. The ditch also meets this definition. The ditch was dug in the floodplain of the Russian River, but the area surrounding the ditch is uplands. Features that meet the definition of sections (b)(3) and (b)(6) are not waters of the U.S., even where they include wetlands that would otherwise meet the terms of paragraphs (a)(4) through (a)(8).

TABLE 2
APPLICATION OF THE 2015 CLEAN WATER RULE TO AQUATIC RESOURCES Map ID 33 CFR 328.3 Waters Type Waters of the
U.S. (ac)
Excluded by
Rule (ac)
Rationale
Wetlands
SW-1 (b)(4)(v) – Water-filled
Depression
-- 0.140 SW-1 is in the bottom of a pit
excavated in dry land for gravel.

SW-2 (b)(3)(i) – Ephemeral Ditch,
(b)(6) – Stormwater Control
Feature
-- 0.038 SW-2 is in the bottom of a ditch
excavated in dry land, with
ephemeral flow, that conveys
stormwater.

Wetlands Subtotal: -- 0.178
Total: -- 0.178

5.3 Conclusions
A total of 0.178 acre of seasonal wetlands occurs in the study area. The seasonal wetlands are excluded by rule as waters of the U.S.

This report documents the wetland boundary delineation and best professional judgment of ESA investigators. All conclusions presented should be considered preliminary and subject to change pending official review and preliminary jurisdictional determination in writing by the USACE.

Page 775 of 1534 ends
Page 776 of 1534 ends

Ukiah Riverside Park Regeneration Project 21 ESA / 181242 Aquatic Resources Delineation Report July 2019
Preliminary  Subject to Revision
CHAPTER 6
References
Baldwin, B.G., D.H. Goldman, D.J. Keil, R. Patterson, T.J. Rosatti, and D.H. Wilken, editors, 2012. The Jepson manual: Vascular plants of California, second edition. University of California Press, Berkeley, CA.

Environmental Laboratory, 1987. Corps of Engineers Wetland Delineation Manual (Technical Report Y-87-1). U.S. Army Corps of Engineers Waterways Experimental Station.

Vicksburg, MS.

Federal Emergency Management Agency (FEMA). 2019. FEMA Flood Map Service Center; Flood Insurance Rate Map (FIRM). Accessed June 2019. Available:
https://msc.fema.gov/portal/home
Federal Geographic Data Committee (FGDC). 2013. Classification of Wetlands and Deepwater Habitats of the United States. FGDC-STD-004-2013. Second Edition. Wetlands Subcommittee, Federal Geographic Data Committee and U.S. Fish and Wildlife Service, Washington, D.C.

Google, Inc. 2019. Google Earth (Version 7.3.2.5776) [Software]. Available:
www.google.com/earth/. Accessed June 2019.

Lichvar, R.W., D.L. Banks, W.M. Kirchner, and N.C. Melvin, 2016. The National Wetland Plant List: 2016 Wetland Ratings. Phytoneuron 2016-30: 1-17.

Munsell Color, 2015. Munsell Soil Color Charts, revised edition. Macbeth Division of Kollmorgen Instruments Corporation, New Windsor, NY.

National Weather Service Forecast Office (NWSFO). 2019. Preliminary monthly climate data for Ukiah, CA. Accessed June 2019. Available:
https://w2.weather.gov/climate/index.php?wfo=eka
Natural Resources Conservation Service (NRCS), U.S. Department of Agriculture, 1999. Soil taxonomy, second edition. Agriculture Handbook Number 436. ———, 2019a. Online Soil Survey. Available:
https://websoilsurvey.sc.egov.usda.gov/App/HomePage.htm. Accessed June 2019. ———, 2019b. List of Hydric Soils. Available: www.nrcs.usda.gov/wps/portal/nrcs/main/soils/ use/hydric. Accessed June 2019.

U.S. Army Corps of Engineers (USACE), 1971. Navigable waterways as of 2 August 1971.

Page 777 of 1534 ends

6. References
Ukiah Riverside Park Regeneration Project 22 ESA / 181242 Aquatic Resources Delineation Report July 2019
Preliminary  Subject to Revision
———, 2008. Regional Supplement to the Corps of Engineers Wetland Delineation Manual:

Arid West Region (Version 2.0) ed. J.S. Wakeley, R.W. Lichvar, and C.V. Noble. ERDC/ EL TR-06-16. Vicksburg, MS: U.S. Army Engineer Research and Development Center. ———, 2014. A guide to ordinary high water mark (OHWM) delineation for non-perennial streams in the western mountains, valleys, and coast region of the United States. Technical Report ERDC/CRREL TR-14-13. U.S. Army Engineer Research and Development Center, Vicksburg, MS.

U.S. Fish and Wildlife Service (USFWS). 2019. National Wetlands Inventory. Available:
www.fws.gov/wetlands/Data/Mapper.html. Accessed June 2019.

U.S. Geological Survey (USGS). 2019. USGS Historical Topographic Map Explorer. Available:
http://historicalmaps.arcgis.com/usgs/. Accessed June 2019.

Western Regional Climate Center, 2019. Period of Record General Climate Summary for Ukiah, California, 1893 –2013. Available: www.wrcc.dri.edu/coopmap. Accessed June 2019.

Page 778 of 1534 ends

Ukiah Riverside Park Regeneration Project
A-1 ESA / 181242
Aquatic Resources Delineation Report July 2019
Preliminary  Subject to Revision

Page 779 of 1534 ends

WETLAND DETERMINATION DATA FORM – Arid West Region
Routine Wetland Determination
(September 2008 V2.0 COE Arid West Wetlands Delineation Manual) Project/Site: Ukiah Riverside Park Regeneration City/County: Ukiah/Mendocino Sampling Date: 22 May 2019 Applicant/Owner: City of Ukiah State: CA Sampling Point: 1 Investigator(s): Chuck Hughes and Elizabeth Hill Section, Township, Range: See Report Landform (hillslope, terrace, etc.): Excavated basin Local relief (concave, convex, none): concave-concave Slope (%): 1 Subregion (LRR): C Lat: See Report Long: Datum:

Soil Map Unit Name: Xerofluvents 0-2% slopes NWI classification: None Are climatic/hydrologic conditions on the site typical for this time of the year? Yes No (If no, explain in remarks.) Are Vegetation Soil , Or Hydrology significantly disturbed? Are “Normal Circumstances” present? Yes No Are Vegetation Soil , Or Hydrology Naturally problematic? (If needed, explain any answers in remarks.) SUMMARY OF FINDINGS – Attach site map showing sampling point locations, transects, important features, etc.

Hydrophytic Vegetation Present? Yes No
Is the Sampled Area
within a Wetland? Yes No
Hydric Soil Present? Yes No
Wetland Hydrology Present? Yes No
Remarks:

VEGETATION
Tree Stratum: ((Plot size:_____________) Absolute
% Cover
Dominant
Species?
Indicator
Status Dominance Test worksheet:

1. Number of Dominant Species

2. That Are OBL, FACW or FAC: 2 (A)

3. Total Number of Dominant

4. Species Across All Strata: 2 (B)
Total Cover:

Percent of Dominant Species
That Are OBL, FACW, or
FAC: 100% (A/B)
Sapling/Shrub Stratum: (Plot size:_____________) Prevalence Index worksheet:

Total % Cover of: Multiply by:

1. 2. OBL Species: x 1 =

3. 4. FACW Species x 2 =

5. FAC Species x 3 =
Total Cover:

FACU Species x 4 =
Herb Stratum: (Plot size:____6 ft. radius_________)
UPL Species x 5 =

1. Festuca perennis 35 D FAC

2. Rumex sp. (at least FACW) 30 D FACW Column Totals: (A) (B)

3. Epilobium ciliatum 5 FACW

4. Eleocharis macrostachya 1 OBL Prevalence Index = B/A =

5. Hydrophytic Vegetation Indicators:

6. Dominance Test is >50%

7. Prevalence Index is ≤3.01

8. Morphological Adaptations1 (Provide supporting
data in Remarks or on a separate sheet)
Total Cover: 71 Problematic Hydrophytic Vegetation1(Explain) 1 Indicators of Hydric soil and wetland hydrology
must be present.

Woody Vine Stratum: (Plot size:_____________)

1. Hydrophytic
Vegetation
Present? Yes No

2. Total Cover:
% Bare Ground in Herb Stratum 40 % Cover of Biotic Crust 0 Remarks:

US Army Corps of Engineers Arid West – Version 2.0

Page 780 of 1534 ends

SOIL Sampling Point: 1
Profile Description: (Describe the depth needed to document the Indicator or confirm the absence of Indicators.) Depth Matrix Redox Features
Inches Color (moist) % Color (moist) % Type1 Loc2 Texture Remarks 0-2 10YR 4/2 99 10YR 5/8 1 C M Clay loam
2-6 10YR 2/2 100 Loam
6-12 10YR 3/2 85 10YR 3/6 15 C M Clay loam
1Type : C=Concentration, D=Depletion, RM=Reduced Matrix, CS=Covered or Coated Sand Grains 2Location: PL=Pore Lining, M=Matrix Hydric Soil Indicators: (Applicable to all LRRs, unless otherwise noted.) Indicators for Problematic Hydric Soils3:

Histosol (A1) Sandy Redox (S5) 1 cm Muck (A9) (LRR C)
Histic Epipedon (A2) Stripped Matrix (S6) 2 cm Muck (A10) (LRR B) Black Histic (A3) Loamy Mucky Mineral (F1) Reduced Vertic (F18) Hydrogen Sulfide (A4) Loamy Gleyed Matrix (F2) Red Parent Material (TF2) Stratified Layers (A5) (LRR C) Depleted Matrix (F3) Other (Explain in Remarks) 1 cm Muck (A9) (LRR D) Redox Dark Surface (F6)
Depleted Below Dark Surface (A11) Depleted Dark Surface (F7) Thick Dark Surface (A12) Redox Depressions (F8)
Sandy Mucky Mineral (S1) Vernal Pools (F9) 3
Indicators of hydrophytic vegetation and
wetland hydrology must be present, unless
disturbed or problematic.

Sandy Gleyed Matrix (S4)
Restrictive Layer (if present):

Type:

Depth (inches):

Hydric Soil Present? Yes No
Remarks: Stratification from repeated inundation events evident. Two pits dug within 2 feet of each other to get clear soil data. Very dark second horizon appears variable in depth.

HYDROLOGY
Wetland Hydrology Indicators:

Primary Indicators (minimum of one required; check all that apply) Secondary Indicators (2or more required) Surface water (A1) Salt Crust (B11) Water Marks (B1) (Riverine) High water Table (A2) Biotic Crust (B12) Sediment Deposits (B2) (Riverine) Saturation (A3) Aquatic Invertebrates (B13) Drift Deposits (B3) (Riverine) Water Marks (B1) (Nonriverine) Hydrogen Sulfide Odor (C1) Drainage Patterns (B10) Sediment Deposits (B2) (Nonriverine) Oxidized Rhizospheres along Living Roots (C3) Dry-Season Water Table (C2) Drift Deposits (B3) (Nonriverine) Presence of Reduced Iron (C4) Crayfish Burrows (C8) Surface Soil Cracks (B6) Recent Iron Reduction in Tilled Soils (C6) Saturation Visible-Aerial Imagery (C9) Inundation Visible on Aerial Imagery (B7) Thin Muck Surface (C7) Shallow Aquitard (D3) Water-Stained Leaves (B9) Other (Explain in Remarks) FAC-Neutral test (D5) Field Observations:

Surface Water Present? Yes No Depth (inches):

Water Table Present? Yes No Depth (inches): 2
Saturation Present? Yes No Depth (inches): 1 Wetland Hydrology Present? Yes No (includes capillary fringe)
Describe Recorded Data (stream gauge, monitoring well, aerial photos, previous inspections, if available:

Remarks:

US Army Corps of Engineers Arid West – Version 2.0

Page 781 of 1534 ends

WETLAND DETERMINATION DATA FORM – Arid West Region
Routine Wetland Determination
(September 2008 V2.0 COE Arid West Wetlands Delineation Manual) Project/Site: Ukiah Riverside Park Regeneration City/County: Ukiah/Mendocino Sampling Date: 22 May 2019 Applicant/Owner: City of Ukiah State: CA Sampling Point: 2 Investigator(s): Chuck Hughes and Elizabeth Hill Section, Township, Range: See Report Landform (hillslope, terrace, etc.): Excavated basin side-slope Local relief (concave, convex, none): Convex-linear Slope (%): 100 Subregion (LRR): C Lat: See Report Long: Datum:

Soil Map Unit Name: Xerofluvents 0-2% slopes NWI classification: None Are climatic/hydrologic conditions on the site typical for this time of the year? Yes No (If no, explain in remarks.) Are Vegetation Soil , Or Hydrology significantly disturbed? Are “Normal Circumstances” present? Yes No Are Vegetation Soil , Or Hydrology Naturally problematic? (If needed, explain any answers in remarks.) SUMMARY OF FINDINGS – Attach site map showing sampling point locations, transects, important features, etc.

Hydrophytic Vegetation Present? Yes No
Is the Sampled Area
within a Wetland? Yes No
Hydric Soil Present? Yes No
Wetland Hydrology Present? Yes No
Remarks:

VEGETATION
Tree Stratum: ((Plot size:_____________) Absolute
% Cover
Dominant
Species?
Indicator
Status Dominance Test worksheet:

1. Number of Dominant Species

2. That Are OBL, FACW or FAC: 1 (A)

3. Total Number of Dominant

4. Species Across All Strata: 2 (B)
Total Cover:

Percent of Dominant Species
That Are OBL, FACW, or
FAC: 50% (A/B)
Sapling/Shrub Stratum: (Plot size:_____________) Prevalence Index worksheet:

Total % Cover of: Multiply by:

1. 2. OBL Species: x 1 =

3. 4. FACW Species x 2 =

5. FAC Species x 3 =
Total Cover:

FACU Species x 4 =
Herb Stratum: (Plot size:___6 ft radius__________)
UPL Species x 5 =

1. Raphanus sp. 40 D UPL

2. Festuca perennis 30 D FAC Column Totals: (A) (B)

3. Sonchus asper ssp. asper 3 FAC

4. Rumex sp. (at least FACW) 1 FACW Prevalence Index = B/A =

5. Hydrophytic Vegetation Indicators:

6. Dominance Test is >50%

7. Prevalence Index is ≤3.01

8. Morphological Adaptations1 (Provide supporting
data in Remarks or on a separate sheet)
Total Cover: 74 Problematic Hydrophytic Vegetation1(Explain) 1 Indicators of Hydric soil and wetland hydrology
must be present.

Woody Vine Stratum: (Plot size:_____________)

1. Hydrophytic
Vegetation
Present? Yes No

2. Total Cover:
% Bare Ground in Herb Stratum 25 % Cover of Biotic Crust 0 Remarks:

US Army Corps of Engineers Arid West – Version 2.0

Page 782 of 1534 ends

SOIL Sampling Point: 2
Profile Description: (Describe the depth needed to document the Indicator or confirm the absence of Indicators.) Depth Matrix Redox Features
Inches Color (moist) % Color (moist) % Type1 Loc2 Texture Remarks 0-12 10YR 4/3 100 Loam Much gravel
1Type : C=Concentration, D=Depletion, RM=Reduced Matrix, CS=Covered or Coated Sand Grains 2Location: PL=Pore Lining, M=Matrix Hydric Soil Indicators: (Applicable to all LRRs, unless otherwise noted.) Indicators for Problematic Hydric Soils3:

Histosol (A1) Sandy Redox (S5) 1 cm Muck (A9) (LRR C)
Histic Epipedon (A2) Stripped Matrix (S6) 2 cm Muck (A10) (LRR B) Black Histic (A3) Loamy Mucky Mineral (F1) Reduced Vertic (F18) Hydrogen Sulfide (A4) Loamy Gleyed Matrix (F2) Red Parent Material (TF2) Stratified Layers (A5) (LRR C) Depleted Matrix (F3) Other (Explain in Remarks) 1 cm Muck (A9) (LRR D) Redox Dark Surface (F6)
Depleted Below Dark Surface (A11) Depleted Dark Surface (F7) Thick Dark Surface (A12) Redox Depressions (F8)
Sandy Mucky Mineral (S1) Vernal Pools (F9) 3
Indicators of hydrophytic vegetation and
wetland hydrology must be present, unless
disturbed or problematic.

Sandy Gleyed Matrix (S4)
Restrictive Layer (if present):

Type:

Depth (inches):

Hydric Soil Present? Yes No
Remarks:

HYDROLOGY
Wetland Hydrology Indicators:

Primary Indicators (minimum of one required; check all that apply) Secondary Indicators (2or more required) Surface water (A1) Salt Crust (B11) Water Marks (B1) (Riverine) High water Table (A2) Biotic Crust (B12) Sediment Deposits (B2) (Riverine) Saturation (A3) Aquatic Invertebrates (B13) Drift Deposits (B3) (Riverine) Water Marks (B1) (Nonriverine) Hydrogen Sulfide Odor (C1) Drainage Patterns (B10) Sediment Deposits (B2) (Nonriverine) Oxidized Rhizospheres along Living Roots (C3) Dry-Season Water Table (C2) Drift Deposits (B3) (Nonriverine) Presence of Reduced Iron (C4) Crayfish Burrows (C8) Surface Soil Cracks (B6) Recent Iron Reduction in Tilled Soils (C6) Saturation Visible-Aerial Imagery (C9) Inundation Visible on Aerial Imagery (B7) Thin Muck Surface (C7) Shallow Aquitard (D3) Water-Stained Leaves (B9) Other (Explain in Remarks) FAC-Neutral test (D5) Field Observations:

Surface Water Present? Yes No Depth (inches):

Water Table Present? Yes No Depth (inches):

Saturation Present? Yes No Depth (inches): Wetland Hydrology Present? Yes No (includes capillary fringe)
Describe Recorded Data (stream gauge, monitoring well, aerial photos, previous inspections, if available:

Remarks:

US Army Corps of Engineers Arid West – Version 2.0

Page 783 of 1534 ends

WETLAND DETERMINATION DATA FORM – Arid West Region
Routine Wetland Determination
(September 2008 V2.0 COE Arid West Wetlands Delineation Manual) Project/Site: Ukiah Riverside Park Regeneration City/County: Ukiah/Mendocino Sampling Date: 22 May 2019 Applicant/Owner: City of Ukiah State: CA Sampling Point: 3 Investigator(s): Chuck Hughes and Elizabeth Hill Section, Township, Range: See Report Landform (hillslope, terrace, etc.): Terrace Local relief (concave, convex, none): concave-concave Slope (%): ≈0 Subregion (LRR): C Lat: See Report Long: Datum:

Soil Map Unit Name: Xerofluvents 0-2% slopes NWI classification: None Are climatic/hydrologic conditions on the site typical for this time of the year? Yes No (If no, explain in remarks.) Are Vegetation Soil , Or Hydrology significantly disturbed? Are “Normal Circumstances” present? Yes No Are Vegetation Soil , Or Hydrology Naturally problematic? (If needed, explain any answers in remarks.) SUMMARY OF FINDINGS – Attach site map showing sampling point locations, transects, important features, etc.

Hydrophytic Vegetation Present? Yes No
Is the Sampled Area
within a Wetland? Yes No
Hydric Soil Present? Yes No
Wetland Hydrology Present? Yes No
Remarks:

VEGETATION
Tree Stratum: ((Plot size:_____________) Absolute
% Cover
Dominant
Species?
Indicator
Status Dominance Test worksheet:

1. Number of Dominant Species

2. That Are OBL, FACW or FAC: 1 (A)

3. Total Number of Dominant

4. Species Across All Strata: 2 (B)
Total Cover:

Percent of Dominant Species
That Are OBL, FACW, or
FAC: 50% (A/B)
Sapling/Shrub Stratum: (Plot size:_____________) Prevalence Index worksheet:

Total % Cover of: Multiply by:

1. 2. OBL Species: x 1 =

3. 4. FACW Species x 2 =

5. FAC Species x 3 =
Total Cover:

FACU Species x 4 =
Herb Stratum: (Plot size:___3 ft radius__________)
UPL Species x 5 =

1. Festuca perennis 30 D FAC

2. Epilobium ciliatum 3 FACW Column Totals: (A) (B)

3. Festuca bromoides 25 D FACU

4. Geranium dissectum 5 UPL Prevalence Index = B/A =

5. Bromus hordeaceus 15 FACU Hydrophytic Vegetation Indicators:

6. Hirschfeldia incana 2 UPL Dominance Test is >50%

7. Prevalence Index is ≤3.01

8. Morphological Adaptations1 (Provide supporting
data in Remarks or on a separate sheet)
Total Cover: 80 Problematic Hydrophytic Vegetation1(Explain) 1 Indicators of Hydric soil and wetland hydrology
must be present.

Woody Vine Stratum: (Plot size:_____________)

1. Hydrophytic
Vegetation
Present? Yes No

2. Total Cover:
% Bare Ground in Herb Stratum 20 % Cover of Biotic Crust 0 Remarks:

US Army Corps of Engineers Arid West – Version 2.0

Page 784 of 1534 ends

SOIL Sampling Point: 3
Profile Description: (Describe the depth needed to document the Indicator or confirm the absence of Indicators.) Depth Matrix Redox Features
Inches Color (moist) % Color (moist) % Type1 Loc2 Texture Remarks 0-12 10YR 4/3 100 Loam
Much cobble & old
refuse (screws) mixed in
1Type : C=Concentration, D=Depletion, RM=Reduced Matrix, CS=Covered or Coated Sand Grains 2Location: PL=Pore Lining, M=Matrix Hydric Soil Indicators: (Applicable to all LRRs, unless otherwise noted.) Indicators for Problematic Hydric Soils3:

Histosol (A1) Sandy Redox (S5) 1 cm Muck (A9) (LRR C)
Histic Epipedon (A2) Stripped Matrix (S6) 2 cm Muck (A10) (LRR B) Black Histic (A3) Loamy Mucky Mineral (F1) Reduced Vertic (F18) Hydrogen Sulfide (A4) Loamy Gleyed Matrix (F2) Red Parent Material (TF2) Stratified Layers (A5) (LRR C) Depleted Matrix (F3) Other (Explain in Remarks) 1 cm Muck (A9) (LRR D) Redox Dark Surface (F6)
Depleted Below Dark Surface (A11) Depleted Dark Surface (F7) Thick Dark Surface (A12) Redox Depressions (F8)
Sandy Mucky Mineral (S1) Vernal Pools (F9) 3
Indicators of hydrophytic vegetation and
wetland hydrology must be present, unless
disturbed or problematic.

Sandy Gleyed Matrix (S4)
Restrictive Layer (if present):

Type:

Depth (inches):

Hydric Soil Present? Yes No
Remarks:

HYDROLOGY
Wetland Hydrology Indicators:

Primary Indicators (minimum of one required; check all that apply) Secondary Indicators (2or more required) Surface water (A1) Salt Crust (B11) Water Marks (B1) (Riverine) High water Table (A2) Biotic Crust (B12) Sediment Deposits (B2) (Riverine) Saturation (A3) Aquatic Invertebrates (B13) Drift Deposits (B3) (Riverine) Water Marks (B1) (Nonriverine) Hydrogen Sulfide Odor (C1) Drainage Patterns (B10) Sediment Deposits (B2) (Nonriverine) Oxidized Rhizospheres along Living Roots (C3) Dry-Season Water Table (C2) Drift Deposits (B3) (Nonriverine) Presence of Reduced Iron (C4) Crayfish Burrows (C8) Surface Soil Cracks (B6) Recent Iron Reduction in Tilled Soils (C6) Saturation Visible-Aerial Imagery (C9) Inundation Visible on Aerial Imagery (B7) Thin Muck Surface (C7) Shallow Aquitard (D3) Water-Stained Leaves (B9) Other (Explain in Remarks) FAC-Neutral test (D5) Field Observations:

Surface Water Present? Yes No Depth (inches):

Water Table Present? Yes No Depth (inches):

Saturation Present? Yes No Depth (inches): Wetland Hydrology Present? Yes No (includes capillary fringe)
Describe Recorded Data (stream gauge, monitoring well, aerial photos, previous inspections, if available:

Remarks:

US Army Corps of Engineers Arid West – Version 2.0

Page 785 of 1534 ends