Analytical Report
McCampbell Analytical, Inc. 1534 Willow Pass Road, Pittsburg, CA 94565-1701 Toll Free Telephone: (877) 252-9262 / Fax: (925) 252-9269 http://www.mccampbell.com / E-mail: [email protected] "When Quality Counts" Client: Environmental Science Associates
Project: D181242.01; Ukiah Riverside Park
Date Received: 03/23/2022 12:14
Date Prepared: 03/25/2022
WorkOrder: 2203E13
Extraction Method: SW3550B
Analytical Method: SW8270C
Unit: mg/Kg
Semi-Volatile Organics
S-2 2203E13-002A Soil 03/23/2022 09:34 GC21 03252217.D 242025 Analytes Result Qualifiers MDL RL DF Date Analyzed
Client ID Lab ID Matrix Date Collected Instrument Batch ID Surrogates REC (%) Qualifiers Limits
Analyst(s): KVE Analytical Comments: a3,a4,c1
2-Fluorophenol 104 60-130 03/25/2022 22:41
Phenol-d5 89 50-130 03/25/2022 22:41
Nitrobenzene-d5 79 60-130 03/25/2022 22:41
2-Fluorobiphenyl 100 60-130 03/25/2022 22:41
2,4,6-Tribromophenol 152 S 50-130 03/25/2022 22:41
4-Terphenyl-d14 80 50-130 03/25/2022 22:41
CA ELAP 1644 • NELAP 4033ORELAP
(Cont.)
Analytical Report
McCampbell Analytical, Inc. 1534 Willow Pass Road, Pittsburg, CA 94565-1701 Toll Free Telephone: (877) 252-9262 / Fax: (925) 252-9269 http://www.mccampbell.com / E-mail: [email protected] "When Quality Counts" Client: Environmental Science Associates
Project: D181242.01; Ukiah Riverside Park
Date Received: 03/23/2022 12:14
Date Prepared: 03/25/2022
WorkOrder: 2203E13
Extraction Method: SW3550B
Analytical Method: SW8270C
Unit: mg/Kg
Semi-Volatile Organics
S-3 2203E13-003A Soil 03/23/2022 09:13 GC21 03252218.D 242025 Analytes Result Qualifiers MDL RL DF Date Analyzed
Client ID Lab ID Matrix Date Collected Instrument Batch ID Acenaphthene ND 0.00035 0.0013 1 03/25/2022 23:08
Acenaphthylene ND 0.00028 0.0013 1 03/25/2022 23:08
Acetochlor ND 0.044 0.25 1 03/25/2022 23:08
Anthracene ND 0.00057 0.0013 1 03/25/2022 23:08
Benzidine ND 0.36 1.2 1 03/25/2022 23:08
Benzo (a) anthracene ND 0.0036 0.013 1 03/25/2022 23:08 Benzo (a) pyrene 0.0014 J 0.00070 0.0025 1 03/25/2022 23:08 Benzo (b) fluoranthene 0.0025 J 0.0013 0.0025 1 03/25/2022 23:08 Benzo (g,h,i) perylene 0.0022 J 0.00089 0.0025 1 03/25/2022 23:08 Benzo (k) fluoranthene ND 0.0010 0.0025 1 03/25/2022 23:08 Benzyl Alcohol ND 0.55 1.2 1 03/25/2022 23:08
1,1-Biphenyl ND 0.0029 0.013 1 03/25/2022 23:08
Bis (2-chloroethoxy) Methane ND 0.030 0.25 1 03/25/2022 23:08 Bis (2-chloroethyl) Ether ND 0.00036 0.0013 1 03/25/2022 23:08 Bis (2-chloroisopropyl) Ether ND 0.0012 0.0025 1 03/25/2022 23:08 Bis (2-ethylhexyl) Adipate ND 0.085 0.25 1 03/25/2022 23:08 Bis (2-ethylhexyl) Phthalate 0.0054 J 0.0047 0.013 1 03/25/2022 23:08 4-Bromophenyl Phenyl Ether ND 0.040 0.25 1 03/25/2022 23:08 Butylbenzyl Phthalate ND 0.0036 0.013 1 03/25/2022 23:08 4-Chloroaniline ND 0.00092 0.0013 1 03/25/2022 23:08
4-Chloro-3-methylphenol ND 0.062 0.25 1 03/25/2022 23:08 2-Chloronaphthalene ND 0.041 0.25 1 03/25/2022 23:08
2-Chlorophenol ND 0.0024 0.013 1 03/25/2022 23:08
4-Chlorophenyl Phenyl Ether ND 0.066 0.25 1 03/25/2022 23:08 Chrysene 0.0015 J 0.00067 0.0025 1 03/25/2022 23:08
Dibenzo (a,h) anthracene ND 0.0011 0.0025 1 03/25/2022 23:08 Dibenzofuran 0.00028 J 0.000093 0.0013 1 03/25/2022 23:08 Di-n-butyl Phthalate ND 0.0044 0.013 1 03/25/2022 23:08 1,2-Dichlorobenzene ND 0.053 0.25 1 03/25/2022 23:08
1,3-Dichlorobenzene ND 0.042 0.25 1 03/25/2022 23:08
1,4-Dichlorobenzene ND 0.049 0.25 1 03/25/2022 23:08
3,3-Dichlorobenzidine ND 0.0026 0.013 1 03/25/2022 23:08 2,4-Dichlorophenol ND 0.0012 0.0025 1 03/25/2022 23:08
Diethyl Phthalate ND 0.0040 0.013 1 03/25/2022 23:08
2,4-Dimethylphenol ND 0.044 0.25 1 03/25/2022 23:08
Dimethyl Phthalate ND 0.0019 0.0025 1 03/25/2022 23:08
4,6-Dinitro-2-methylphenol ND 0.41 1.2 1 03/25/2022 23:08 CA ELAP 1644 • NELAP 4033ORELAP
(Cont.)
Analytical Report
McCampbell Analytical, Inc. 1534 Willow Pass Road, Pittsburg, CA 94565-1701 Toll Free Telephone: (877) 252-9262 / Fax: (925) 252-9269 http://www.mccampbell.com / E-mail: [email protected] "When Quality Counts" Client: Environmental Science Associates
Project: D181242.01; Ukiah Riverside Park
Date Received: 03/23/2022 12:14
Date Prepared: 03/25/2022
WorkOrder: 2203E13
Extraction Method: SW3550B
Analytical Method: SW8270C
Unit: mg/Kg
Semi-Volatile Organics
S-3 2203E13-003A Soil 03/23/2022 09:13 GC21 03252218.D 242025 Analytes Result Qualifiers MDL RL DF Date Analyzed
Client ID Lab ID Matrix Date Collected Instrument Batch ID 2,4-Dinitrophenol ND 0.11 0.25 1 03/25/2022 23:08
2,4-Dinitrotoluene ND 0.0036 0.013 1 03/25/2022 23:08
2,6-Dinitrotoluene ND 0.062 0.12 1 03/25/2022 23:08
Di-n-octyl Phthalate ND 0.20 0.50 1 03/25/2022 23:08
1,2-Diphenylhydrazine ND 0.038 0.25 1 03/25/2022 23:08
Fluoranthene 0.0013 J 0.00079 0.0025 1 03/25/2022 23:08 Fluorene ND 0.0010 0.0025 1 03/25/2022 23:08
Hexachlorobenzene ND 0.0012 0.0025 1 03/25/2022 23:08
Hexachlorobutadiene ND 0.00019 0.0013 1 03/25/2022 23:08 Hexachlorocyclopentadiene ND 0.52 1.2 1 03/25/2022 23:08 Hexachloroethane ND 0.0026 0.013 1 03/25/2022 23:08
Indeno (1,2,3-cd) pyrene ND 0.0035 0.013 1 03/25/2022 23:08 Isophorone ND 0.069 0.25 1 03/25/2022 23:08
1-Methylnaphthalene 0.0011 J 0.00033 0.0013 1 03/25/2022 23:08 2-Methylnaphthalene 0.0019 0.00048 0.0013 1 03/25/2022 23:08 2-Methylphenol (o-Cresol) ND 0.060 0.25 1 03/25/2022 23:08 3 & 4-Methylphenol (m,p-Cresol) ND 0.046 0.25 1 03/25/2022 23:08 Naphthalene ND 0.0031 0.0062 1 03/25/2022 23:08
2-Nitroaniline ND 0.31 1.2 1 03/25/2022 23:08
3-Nitroaniline ND 0.24 1.2 1 03/25/2022 23:08
4-Nitroaniline ND 0.28 1.2 1 03/25/2022 23:08
Nitrobenzene ND 0.055 0.25 1 03/25/2022 23:08
2-Nitrophenol ND 0.31 1.2 1 03/25/2022 23:08
4-Nitrophenol ND 0.35 1.2 1 03/25/2022 23:08
N-Nitrosodiphenylamine ND 0.029 0.25 1 03/25/2022 23:08 N-Nitrosodi-n-propylamine ND 0.079 0.25 1 03/25/2022 23:08 Pentachlorophenol ND 0.029 0.062 1 03/25/2022 23:08
Phenanthrene 0.0042 0.00068 0.0013 1 03/25/2022 23:08
Phenol ND 0.0018 0.0050 1 03/25/2022 23:08
Pyrene 0.0014 J 0.00063 0.0025 1 03/25/2022 23:08
Pyridine ND 0.046 0.25 1 03/25/2022 23:08
2,3,4,6-Tetrachlorophenol ND 0.079 0.25 1 03/25/2022 23:08 1,2,4-Trichlorobenzene ND 0.046 0.25 1 03/25/2022 23:08 2,4,5-Trichlorophenol ND 0.00059 0.0025 1 03/25/2022 23:08 2,4,6-Trichlorophenol ND 0.00057 0.0025 1 03/25/2022 23:08 CA ELAP 1644 • NELAP 4033ORELAP
(Cont.)
Analytical Report
McCampbell Analytical, Inc. 1534 Willow Pass Road, Pittsburg, CA 94565-1701 Toll Free Telephone: (877) 252-9262 / Fax: (925) 252-9269 http://www.mccampbell.com / E-mail: [email protected] "When Quality Counts" Client: Environmental Science Associates
Project: D181242.01; Ukiah Riverside Park
Date Received: 03/23/2022 12:14
Date Prepared: 03/25/2022
WorkOrder: 2203E13
Extraction Method: SW3550B
Analytical Method: SW8270C
Unit: mg/Kg
Semi-Volatile Organics
S-3 2203E13-003A Soil 03/23/2022 09:13 GC21 03252218.D 242025 Analytes Result Qualifiers MDL RL DF Date Analyzed
Client ID Lab ID Matrix Date Collected Instrument Batch ID Surrogates REC (%) Limits
Analyst(s): KVE
2-Fluorophenol 91 60-130 03/25/2022 23:08
Phenol-d5 88 50-130 03/25/2022 23:08
Nitrobenzene-d5 79 60-130 03/25/2022 23:08
2-Fluorobiphenyl 86 60-130 03/25/2022 23:08
2,4,6-Tribromophenol 70 50-130 03/25/2022 23:08
4-Terphenyl-d14 84 50-130 03/25/2022 23:08
CA ELAP 1644 • NELAP 4033ORELAP
(Cont.)
Analytical Report
McCampbell Analytical, Inc. 1534 Willow Pass Road, Pittsburg, CA 94565-1701 Toll Free Telephone: (877) 252-9262 / Fax: (925) 252-9269 http://www.mccampbell.com / E-mail: [email protected] "When Quality Counts" Client: Environmental Science Associates
Project: D181242.01; Ukiah Riverside Park
Date Received: 03/23/2022 12:14
Date Prepared: 03/25/2022
WorkOrder: 2203E13
Extraction Method: SW3550B
Analytical Method: SW8270C
Unit: mg/Kg
Semi-Volatile Organics
S-4 2203E13-004A Soil 03/23/2022 09:24 GC21 03252219.D 242025 Analytes Result Qualifiers MDL RL DF Date Analyzed
Client ID Lab ID Matrix Date Collected Instrument Batch ID Acenaphthene ND 0.014 0.052 5 03/25/2022 23:34
Acenaphthylene ND 0.011 0.052 5 03/25/2022 23:34
Acetochlor ND 1.8 10 5 03/25/2022 23:34
Anthracene ND 0.023 0.052 5 03/25/2022 23:34
Benzidine ND 14 50 5 03/25/2022 23:34
Benzo (a) anthracene ND 0.14 0.52 5 03/25/2022 23:34
Benzo (a) pyrene 0.081 J 0.028 0.10 5 03/25/2022 23:34
Benzo (b) fluoranthene 0.10 J 0.052 0.10 5 03/25/2022 23:34 Benzo (g,h,i) perylene 0.090 J 0.036 0.10 5 03/25/2022 23:34 Benzo (k) fluoranthene 0.043 J 0.040 0.10 5 03/25/2022 23:34 Benzyl Alcohol ND 22 50 5 03/25/2022 23:34
1,1-Biphenyl ND 0.12 0.52 5 03/25/2022 23:34
Bis (2-chloroethoxy) Methane ND 1.2 10 5 03/25/2022 23:34 Bis (2-chloroethyl) Ether ND 0.014 0.052 5 03/25/2022 23:34 Bis (2-chloroisopropyl) Ether ND 0.050 0.10 5 03/25/2022 23:34 Bis (2-ethylhexyl) Adipate ND 3.4 10 5 03/25/2022 23:34 Bis (2-ethylhexyl) Phthalate ND 0.19 0.52 5 03/25/2022 23:34 4-Bromophenyl Phenyl Ether ND 1.6 10 5 03/25/2022 23:34 Butylbenzyl Phthalate ND 0.14 0.52 5 03/25/2022 23:34
4-Chloroaniline ND 0.037 0.052 5 03/25/2022 23:34
4-Chloro-3-methylphenol ND 2.5 10 5 03/25/2022 23:34
2-Chloronaphthalene ND 1.6 10 5 03/25/2022 23:34
2-Chlorophenol ND 0.096 0.52 5 03/25/2022 23:34
4-Chlorophenyl Phenyl Ether ND 2.6 10 5 03/25/2022 23:34 Chrysene 0.059 J 0.027 0.10 5 03/25/2022 23:34
Dibenzo (a,h) anthracene ND 0.044 0.10 5 03/25/2022 23:34 Dibenzofuran ND 0.0037 0.052 5 03/25/2022 23:34
Di-n-butyl Phthalate ND 0.18 0.52 5 03/25/2022 23:34
1,2-Dichlorobenzene ND 2.1 10 5 03/25/2022 23:34
1,3-Dichlorobenzene ND 1.7 10 5 03/25/2022 23:34
1,4-Dichlorobenzene ND 2.0 10 5 03/25/2022 23:34
3,3-Dichlorobenzidine ND 0.10 0.52 5 03/25/2022 23:34
2,4-Dichlorophenol ND 0.050 0.10 5 03/25/2022 23:34
Diethyl Phthalate ND 0.16 0.52 5 03/25/2022 23:34
2,4-Dimethylphenol ND 1.8 10 5 03/25/2022 23:34
Dimethyl Phthalate ND 0.076 0.10 5 03/25/2022 23:34
4,6-Dinitro-2-methylphenol ND 16 50 5 03/25/2022 23:34
CA ELAP 1644 • NELAP 4033ORELAP
(Cont.)
Analytical Report
McCampbell Analytical, Inc. 1534 Willow Pass Road, Pittsburg, CA 94565-1701 Toll Free Telephone: (877) 252-9262 / Fax: (925) 252-9269 http://www.mccampbell.com / E-mail: [email protected] "When Quality Counts" Client: Environmental Science Associates
Project: D181242.01; Ukiah Riverside Park
Date Received: 03/23/2022 12:14
Date Prepared: 03/25/2022
WorkOrder: 2203E13
Extraction Method: SW3550B
Analytical Method: SW8270C
Unit: mg/Kg
Semi-Volatile Organics
S-4 2203E13-004A Soil 03/23/2022 09:24 GC21 03252219.D 242025 Analytes Result Qualifiers MDL RL DF Date Analyzed
Client ID Lab ID Matrix Date Collected Instrument Batch ID 2,4-Dinitrophenol ND 4.4 10 5 03/25/2022 23:34
2,4-Dinitrotoluene ND 0.14 0.52 5 03/25/2022 23:34
2,6-Dinitrotoluene ND 2.5 5.0 5 03/25/2022 23:34
Di-n-octyl Phthalate ND 8.0 20 5 03/25/2022 23:34
1,2-Diphenylhydrazine ND 1.5 10 5 03/25/2022 23:34
Fluoranthene 0.10 0.032 0.10 5 03/25/2022 23:34
Fluorene ND 0.040 0.10 5 03/25/2022 23:34
Hexachlorobenzene ND 0.048 0.10 5 03/25/2022 23:34
Hexachlorobutadiene ND 0.0076 0.052 5 03/25/2022 23:34
Hexachlorocyclopentadiene ND 21 50 5 03/25/2022 23:34
Hexachloroethane ND 0.10 0.52 5 03/25/2022 23:34
Indeno (1,2,3-cd) pyrene ND 0.14 0.52 5 03/25/2022 23:34 Isophorone ND 2.8 10 5 03/25/2022 23:34
1-Methylnaphthalene ND 0.013 0.052 5 03/25/2022 23:34
2-Methylnaphthalene ND 0.019 0.052 5 03/25/2022 23:34
2-Methylphenol (o-Cresol) ND 2.4 10 5 03/25/2022 23:34
3 & 4-Methylphenol (m,p-Cresol) ND 1.8 10 5 03/25/2022 23:34 Naphthalene ND 0.13 0.25 5 03/25/2022 23:34
2-Nitroaniline ND 12 50 5 03/25/2022 23:34
3-Nitroaniline ND 9.6 50 5 03/25/2022 23:34
4-Nitroaniline ND 11 50 5 03/25/2022 23:34
Nitrobenzene ND 2.2 10 5 03/25/2022 23:34
2-Nitrophenol ND 12 50 5 03/25/2022 23:34
4-Nitrophenol ND 14 50 5 03/25/2022 23:34
N-Nitrosodiphenylamine ND 1.2 10 5 03/25/2022 23:34
N-Nitrosodi-n-propylamine ND 3.2 10 5 03/25/2022 23:34
Pentachlorophenol ND 1.2 2.5 5 03/25/2022 23:34
Phenanthrene 0.041 J 0.027 0.052 5 03/25/2022 23:34
Phenol ND 0.072 0.20 5 03/25/2022 23:34
Pyrene 0.072 J 0.025 0.10 5 03/25/2022 23:34
Pyridine ND 1.8 10 5 03/25/2022 23:34
2,3,4,6-Tetrachlorophenol ND 3.2 10 5 03/25/2022 23:34
1,2,4-Trichlorobenzene ND 1.8 10 5 03/25/2022 23:34
2,4,5-Trichlorophenol ND 0.024 0.10 5 03/25/2022 23:34
2,4,6-Trichlorophenol ND 0.023 0.10 5 03/25/2022 23:34
CA ELAP 1644 • NELAP 4033ORELAP
(Cont.)
Analytical Report
McCampbell Analytical, Inc. 1534 Willow Pass Road, Pittsburg, CA 94565-1701 Toll Free Telephone: (877) 252-9262 / Fax: (925) 252-9269 http://www.mccampbell.com / E-mail: [email protected] "When Quality Counts" Client: Environmental Science Associates
Project: D181242.01; Ukiah Riverside Park
Date Received: 03/23/2022 12:14
Date Prepared: 03/25/2022
WorkOrder: 2203E13
Extraction Method: SW3550B
Analytical Method: SW8270C
Unit: mg/Kg
Semi-Volatile Organics
S-4 2203E13-004A Soil 03/23/2022 09:24 GC21 03252219.D 242025 Analytes Result Qualifiers MDL RL DF Date Analyzed
Client ID Lab ID Matrix Date Collected Instrument Batch ID Surrogates REC (%) Limits
Analyst(s): KVE Analytical Comments: a3,a4
2-Fluorophenol 108 60-130 03/25/2022 23:34
Phenol-d5 89 50-130 03/25/2022 23:34
Nitrobenzene-d5 96 60-130 03/25/2022 23:34
2-Fluorobiphenyl 90 60-130 03/25/2022 23:34
2,4,6-Tribromophenol 107 50-130 03/25/2022 23:34
4-Terphenyl-d14 74 50-130 03/25/2022 23:34
CA ELAP 1644 • NELAP 4033ORELAP
Analytical Report
McCampbell Analytical, Inc. 1534 Willow Pass Road, Pittsburg, CA 94565-1701 Toll Free Telephone: (877) 252-9262 / Fax: (925) 252-9269 http://www.mccampbell.com / E-mail: [email protected] "When Quality Counts" Client: Environmental Science Associates
Project: D181242.01; Ukiah Riverside Park
Date Received: 03/23/2022 12:14
Date Prepared: 03/24/2022
WorkOrder: 2203E13
Extraction Method: SW3050B
Analytical Method: SW6020
Unit: mg/Kg
CAM / CCR 17 Metals
S-1 2203E13-001A Soil 03/23/2022 09:00 ICP-MS5 248SMPL.d 241869 Analytes Result Qualifiers MDL RL DF Date Analyzed
Client ID Lab ID Matrix Date Collected Instrument Batch ID Antimony 0.33 J 0.16 0.50 1 03/24/2022 23:07
Arsenic 3.8 0.14 0.50 1 03/24/2022 23:07
Barium 130 0.68 5.0 1 03/24/2022 23:07
Beryllium 0.38 J 0.083 0.50 1 03/24/2022 23:07
Cadmium 0.12 J 0.094 0.50 1 03/24/2022 23:07
Chromium 47 0.13 0.50 1 03/24/2022 23:07
Cobalt 10 0.069 0.50 1 03/24/2022 23:07
Copper 21 0.23 0.50 1 03/24/2022 23:07
Lead 21 0.069 0.50 1 03/24/2022 23:07
Mercury 0.077 0.038 0.050 1 03/24/2022 23:07
Molybdenum 0.27 J 0.14 0.50 1 03/24/2022 23:07
Nickel 63 0.081 0.50 1 03/24/2022 23:07
Selenium ND 0.32 0.50 1 03/24/2022 23:07
Silver 0.14 J 0.11 0.50 1 03/24/2022 23:07
Thallium ND 0.072 0.50 1 03/24/2022 23:07
Vanadium 40 0.15 0.50 1 03/24/2022 23:07
Zinc 65 3.2 5.0 1 03/24/2022 23:07
Surrogates REC (%) Limits
Analyst(s): DB
Terbium 100 70-130 03/24/2022 23:07
CA ELAP 1644 • NELAP 4033ORELAP
(Cont.)
Analytical Report
McCampbell Analytical, Inc. 1534 Willow Pass Road, Pittsburg, CA 94565-1701 Toll Free Telephone: (877) 252-9262 / Fax: (925) 252-9269 http://www.mccampbell.com / E-mail: [email protected] "When Quality Counts" Client: Environmental Science Associates
Project: D181242.01; Ukiah Riverside Park
Date Received: 03/23/2022 12:14
Date Prepared: 03/24/2022
WorkOrder: 2203E13
Extraction Method: SW3050B
Analytical Method: SW6020
Unit: mg/Kg
CAM / CCR 17 Metals
S-2 2203E13-002A Soil 03/23/2022 09:34 ICP-MS5 249SMPL.d 241869 Analytes Result Qualifiers MDL RL DF Date Analyzed
Client ID Lab ID Matrix Date Collected Instrument Batch ID Antimony 0.80 0.16 0.50 1 03/24/2022 23:10
Arsenic 6.4 0.14 0.50 1 03/24/2022 23:10
Barium 180 0.68 5.0 1 03/24/2022 23:10
Beryllium 0.37 J 0.083 0.50 1 03/24/2022 23:10
Cadmium 0.58 0.094 0.50 1 03/24/2022 23:10
Chromium 49 0.13 0.50 1 03/24/2022 23:10
Cobalt 10 0.069 0.50 1 03/24/2022 23:10
Copper 51 0.23 0.50 1 03/24/2022 23:10
Lead 140 0.069 0.50 1 03/24/2022 23:10
Mercury 0.12 0.038 0.050 1 03/24/2022 23:10
Molybdenum 0.52 0.14 0.50 1 03/24/2022 23:10
Nickel 60 0.081 0.50 1 03/24/2022 23:10
Selenium 0.58 0.32 0.50 1 03/24/2022 23:10
Silver 0.19 J 0.11 0.50 1 03/24/2022 23:10
Thallium ND 0.072 0.50 1 03/24/2022 23:10
Vanadium 40 0.15 0.50 1 03/24/2022 23:10
Zinc 270 3.2 5.0 1 03/24/2022 23:10
Surrogates REC (%) Limits
Analyst(s): DB
Terbium 98 70-130 03/24/2022 23:10
CA ELAP 1644 • NELAP 4033ORELAP
(Cont.)
Analytical Report
McCampbell Analytical, Inc. 1534 Willow Pass Road, Pittsburg, CA 94565-1701 Toll Free Telephone: (877) 252-9262 / Fax: (925) 252-9269 http://www.mccampbell.com / E-mail: [email protected] "When Quality Counts" Client: Environmental Science Associates
Project: D181242.01; Ukiah Riverside Park
Date Received: 03/23/2022 12:14
Date Prepared: 03/24/2022
WorkOrder: 2203E13
Extraction Method: SW3050B
Analytical Method: SW6020
Unit: mg/Kg
CAM / CCR 17 Metals
S-3 2203E13-003A Soil 03/23/2022 09:13 ICP-MS5 250SMPL.d 241869 Analytes Result Qualifiers MDL RL DF Date Analyzed
Client ID Lab ID Matrix Date Collected Instrument Batch ID Antimony 0.45 J 0.16 0.50 1 03/24/2022 23:14
Arsenic 5.4 0.14 0.50 1 03/24/2022 23:14
Barium 160 0.68 5.0 1 03/24/2022 23:14
Beryllium 0.46 J 0.083 0.50 1 03/24/2022 23:14
Cadmium 0.11 J 0.094 0.50 1 03/24/2022 23:14
Chromium 69 0.13 0.50 1 03/24/2022 23:14
Cobalt 13 0.069 0.50 1 03/24/2022 23:14
Copper 23 0.23 0.50 1 03/24/2022 23:14
Lead 25 0.069 0.50 1 03/24/2022 23:14
Mercury ND 0.038 0.050 1 03/24/2022 23:14
Molybdenum 0.30 J 0.14 0.50 1 03/24/2022 23:14
Nickel 87 0.081 0.50 1 03/24/2022 23:14
Selenium ND 0.32 0.50 1 03/24/2022 23:14
Silver 0.15 J 0.11 0.50 1 03/24/2022 23:14
Thallium ND 0.072 0.50 1 03/24/2022 23:14
Vanadium 54 0.15 0.50 1 03/24/2022 23:14
Zinc 60 3.2 5.0 1 03/24/2022 23:14
Surrogates REC (%) Limits
Analyst(s): DB
Terbium 100 70-130 03/24/2022 23:14
CA ELAP 1644 • NELAP 4033ORELAP
(Cont.)
Analytical Report
McCampbell Analytical, Inc. 1534 Willow Pass Road, Pittsburg, CA 94565-1701 Toll Free Telephone: (877) 252-9262 / Fax: (925) 252-9269 http://www.mccampbell.com / E-mail: [email protected] "When Quality Counts" Client: Environmental Science Associates
Project: D181242.01; Ukiah Riverside Park
Date Received: 03/23/2022 12:14
Date Prepared: 03/24/2022
WorkOrder: 2203E13
Extraction Method: SW3050B
Analytical Method: SW6020
Unit: mg/Kg
CAM / CCR 17 Metals
S-4 2203E13-004A Soil 03/23/2022 09:24 ICP-MS4 145SMPL.d 241869 Analytes Result Qualifiers MDL RL DF Date Analyzed
Client ID Lab ID Matrix Date Collected Instrument Batch ID Antimony 1.6 0.16 0.50 1 03/25/2022 12:38
Arsenic 7.1 0.14 0.50 1 03/25/2022 12:38
Barium 210 0.68 5.0 1 03/25/2022 12:38
Beryllium 0.62 0.083 0.50 1 03/25/2022 12:38
Cadmium 0.15 J 0.094 0.50 1 03/25/2022 12:38
Chromium 82 0.13 0.50 1 03/25/2022 12:38
Cobalt 15 0.069 0.50 1 03/25/2022 12:38
Copper 42 0.23 0.50 1 03/25/2022 12:38
Lead 67 0.069 0.50 1 03/25/2022 12:38
Mercury 0.14 0.038 0.050 1 03/25/2022 12:38
Molybdenum 0.88 0.14 0.50 1 03/25/2022 12:38
Nickel 110 0.081 0.50 1 03/25/2022 12:38
Selenium ND 0.32 0.50 1 03/25/2022 12:38
Silver 0.51 0.11 0.50 1 03/25/2022 12:38
Thallium 0.12 J 0.072 0.50 1 03/25/2022 12:38
Vanadium 59 0.15 0.50 1 03/25/2022 12:38
Zinc 97 3.2 5.0 1 03/25/2022 12:38
Surrogates REC (%) Limits
Analyst(s): AL
Terbium 101 70-130 03/25/2022 12:38
CA ELAP 1644 • NELAP 4033ORELAP
Analytical Report
McCampbell Analytical, Inc. 1534 Willow Pass Road, Pittsburg, CA 94565-1701 Toll Free Telephone: (877) 252-9262 / Fax: (925) 252-9269 http://www.mccampbell.com / E-mail: [email protected] "When Quality Counts" Client: Environmental Science Associates
Project: D181242.01; Ukiah Riverside Park
Date Received: 03/23/2022 12:14
Date Prepared: 03/23/2022
WorkOrder: 2203E13
Extraction Method: SW5035
Analytical Method: SW8021B/8015Bm
Unit: mg/Kg
Gasoline Range (C6-C12) Volatile Hydrocarbons as Gasoline with BTEX and MTBE S-1 2203E13-001A Soil 03/23/2022 09:00 GC3 03242235.D 241885 Analytes Result MDL RL DF Date Analyzed
Client ID Lab ID Matrix Date Collected Instrument Batch ID TPH(g) (C6-C12) ND 0.55 1.0 1 03/25/2022 04:11
MTBE --- 0.0026 0.050 1 03/25/2022 04:11
Benzene --- 0.0018 0.0050 1 03/25/2022 04:11
Toluene --- 0.0022 0.0050 1 03/25/2022 04:11
Ethylbenzene --- 0.0015 0.0050 1 03/25/2022 04:11
m,p-Xylene --- 0.0026 0.010 1 03/25/2022 04:11
o-Xylene --- 0.00098 0.0050 1 03/25/2022 04:11
Xylenes --- NA 0.0050 1 03/25/2022 04:11
Surrogates REC (%) Limits
Analyst(s): IA
2-Fluorotoluene 91 62-126 03/25/2022 04:11
S-2 2203E13-002A Soil 03/23/2022 09:34 GC3 03242236.D 241885 Analytes Result MDL RL DF Date Analyzed
Client ID Lab ID Matrix Date Collected Instrument Batch ID TPH(g) (C6-C12) ND 0.55 1.0 1 03/25/2022 04:41
MTBE --- 0.0026 0.050 1 03/25/2022 04:41
Benzene --- 0.0018 0.0050 1 03/25/2022 04:41
Toluene --- 0.0022 0.0050 1 03/25/2022 04:41
Ethylbenzene --- 0.0015 0.0050 1 03/25/2022 04:41
m,p-Xylene --- 0.0026 0.010 1 03/25/2022 04:41
o-Xylene --- 0.00098 0.0050 1 03/25/2022 04:41
Xylenes --- NA 0.0050 1 03/25/2022 04:41
Surrogates REC (%) Limits
Analyst(s): IA
2-Fluorotoluene 86 62-126 03/25/2022 04:41
CA ELAP 1644 • NELAP 4033ORELAP
(Cont.)
Analytical Report
McCampbell Analytical, Inc. 1534 Willow Pass Road, Pittsburg, CA 94565-1701 Toll Free Telephone: (877) 252-9262 / Fax: (925) 252-9269 http://www.mccampbell.com / E-mail: [email protected] "When Quality Counts" Client: Environmental Science Associates
Project: D181242.01; Ukiah Riverside Park
Date Received: 03/23/2022 12:14
Date Prepared: 03/23/2022
WorkOrder: 2203E13
Extraction Method: SW5035
Analytical Method: SW8021B/8015Bm
Unit: mg/Kg
Gasoline Range (C6-C12) Volatile Hydrocarbons as Gasoline with BTEX and MTBE S-3 2203E13-003A Soil 03/23/2022 09:13 GC3 03242237.D 241885 Analytes Result MDL RL DF Date Analyzed
Client ID Lab ID Matrix Date Collected Instrument Batch ID TPH(g) (C6-C12) ND 0.55 1.0 1 03/25/2022 05:10
MTBE --- 0.0026 0.050 1 03/25/2022 05:10
Benzene --- 0.0018 0.0050 1 03/25/2022 05:10
Toluene --- 0.0022 0.0050 1 03/25/2022 05:10
Ethylbenzene --- 0.0015 0.0050 1 03/25/2022 05:10
m,p-Xylene --- 0.0026 0.010 1 03/25/2022 05:10
o-Xylene --- 0.00098 0.0050 1 03/25/2022 05:10
Xylenes --- NA 0.0050 1 03/25/2022 05:10
Surrogates REC (%) Limits
Analyst(s): IA
2-Fluorotoluene 94 62-126 03/25/2022 05:10
S-4 2203E13-004A Soil 03/23/2022 09:24 GC3 03242238.D 241885 Analytes Result MDL RL DF Date Analyzed
Client ID Lab ID Matrix Date Collected Instrument Batch ID TPH(g) (C6-C12) ND 0.55 1.0 1 03/25/2022 05:40
MTBE --- 0.0026 0.050 1 03/25/2022 05:40
Benzene --- 0.0018 0.0050 1 03/25/2022 05:40
Toluene --- 0.0022 0.0050 1 03/25/2022 05:40
Ethylbenzene --- 0.0015 0.0050 1 03/25/2022 05:40
m,p-Xylene --- 0.0026 0.010 1 03/25/2022 05:40
o-Xylene --- 0.00098 0.0050 1 03/25/2022 05:40
Xylenes --- NA 0.0050 1 03/25/2022 05:40
Surrogates REC (%) Limits
Analyst(s): IA
2-Fluorotoluene 88 62-126 03/25/2022 05:40
CA ELAP 1644 • NELAP 4033ORELAP
Analytical Report
McCampbell Analytical, Inc. 1534 Willow Pass Road, Pittsburg, CA 94565-1701 Toll Free Telephone: (877) 252-9262 / Fax: (925) 252-9269 http://www.mccampbell.com / E-mail: [email protected] "When Quality Counts" Client: Environmental Science Associates
Project: D181242.01; Ukiah Riverside Park
Date Received: 03/23/2022 12:14
Date Prepared: 03/23/2022
WorkOrder: 2203E13
Extraction Method: SW3550B
Analytical Method: SW8015B
Unit: mg/Kg
Total Extractable Petroleum Hydrocarbons w/out SG Clean-Up S-1 2203E13-001A Soil 03/23/2022 09:00 GC9a 03282232.D 241886 Analytes Result MDL RL DF Date Analyzed
Client ID Lab ID Matrix Date Collected Instrument Batch ID TPH-Diesel (C10-C23) 2.1 0.78 2.0 1 03/28/2022 19:53
TPH-Motor Oil (C18-C36) 40 4.6 10 1 03/28/2022 19:53
Surrogates REC (%) Limits
Analyst(s): JIS Analytical Comments: e2,e7
C9 87 70-130 03/28/2022 19:53
S-2 2203E13-002A Soil 03/23/2022 09:34 GC9a 03282242.D 241886 Analytes Result MDL RL DF Date Analyzed
Client ID Lab ID Matrix Date Collected Instrument Batch ID TPH-Diesel (C10-C23) 2.4 0.78 2.0 1 03/28/2022 23:07
TPH-Motor Oil (C18-C36) 67 4.6 10 1 03/28/2022 23:07
Surrogates REC (%) Limits
Analyst(s): JIS Analytical Comments: e2,e7
C9 86 70-130 03/28/2022 23:07
S-3 2203E13-003A Soil 03/23/2022 09:13 GC11A 03282254.D 241886 Analytes Result Qualifiers MDL RL DF Date Analyzed
Client ID Lab ID Matrix Date Collected Instrument Batch ID TPH-Diesel (C10-C23) 1.1 J 0.78 2.0 1 03/29/2022 03:20
TPH-Motor Oil (C18-C36) ND 4.6 10 1 03/29/2022 03:20
Surrogates REC (%) Limits
Analyst(s): JIS
C9 95 70-130 03/29/2022 03:20
CA ELAP 1644 • NELAP 4033ORELAP
(Cont.)
Analytical Report
McCampbell Analytical, Inc. 1534 Willow Pass Road, Pittsburg, CA 94565-1701 Toll Free Telephone: (877) 252-9262 / Fax: (925) 252-9269 http://www.mccampbell.com / E-mail: [email protected] "When Quality Counts" Client: Environmental Science Associates
Project: D181242.01; Ukiah Riverside Park
Date Received: 03/23/2022 12:14
Date Prepared: 03/23/2022
WorkOrder: 2203E13
Extraction Method: SW3550B
Analytical Method: SW8015B
Unit: mg/Kg
Total Extractable Petroleum Hydrocarbons w/out SG Clean-Up S-4 2203E13-004A Soil 03/23/2022 09:24 GC9b 03282251.D 241886 Analytes Result Qualifiers MDL RL DF Date Analyzed
Client ID Lab ID Matrix Date Collected Instrument Batch ID TPH-Diesel (C10-C23) 1.6 J 0.78 2.0 1 03/29/2022 02:21
TPH-Motor Oil (C18-C36) 18 4.6 10 1 03/29/2022 02:21
Surrogates REC (%) Limits
Analyst(s): JIS Analytical Comments: e7
C9 87 70-130 03/29/2022 02:21
CA ELAP 1644 • NELAP 4033ORELAP
Quality Control Report
McCampbell Analytical, Inc. 1534 Willow Pass Road, Pittsburg, CA 94565-1701 Toll Free Telephone: (877) 252-9262 / Fax: (925) 252-9269 http://www.mccampbell.com / E-mail: [email protected] "When Quality Counts" Client: Environmental Science Associates
Project: D181242.01; Ukiah Riverside Park
Date Analyzed: 03/25/2022 - 03/29/2022
Date Prepared: 03/23/2022
WorkOrder: 2203E13
BatchID: 241888
Analytical Method: SW8081A/8082
Unit: mg/kg
Sample ID: MB/LCS/LCSD-241888
2203E13-004AMS/MSD
Instrument: GC22, GC23, GC40
Matrix: Soil
Extraction Method: SW3550B
QC Summary Report for SW8081A/8082
Analyte MB
Result
MDL RL SPK
Val
MB SS
%REC
MB SS
Limits
Aldrin ND 0.00039 0.0010 - - -
a-BHC ND 0.00049 0.0010 - - -
b-BHC ND 0.00027 0.0010 - - -
d-BHC ND 0.00033 0.0010 - - -
g-BHC ND 0.00033 0.0010 - - -
Chlordane (Technical) ND 0.012 0.025 - - -
a-Chlordane ND 0.00043 0.0010 - - -
g-Chlordane ND 0.00034 0.0010 - - -
p,p-DDD ND 0.00041 0.0010 - - -
p,p-DDE ND 0.00029 0.0010 - - -
p,p-DDT ND 0.00039 0.0010 - - -
Dieldrin ND 0.00038 0.0010 - - -
Endosulfan I ND 0.00035 0.0010 - - -
Endosulfan II ND 0.00033 0.0010 - - -
Endosulfan sulfate ND 0.00040 0.0010 - - -
Endrin ND 0.00038 0.0010 - - -
Endrin aldehyde ND 0.00044 0.0010 - - -
Endrin ketone ND 0.00029 0.0010 - - -
Heptachlor ND 0.00030 0.0010 - - -
Heptachlor epoxide ND 0.00030 0.0010 - - -
Hexachlorobenzene ND 0.00070 0.010 - - -
Hexachlorocyclopentadiene ND 0.00052 0.020 - - -
Methoxychlor ND 0.00045 0.0010 - - -
Toxaphene ND 0.033 0.050 - - -
Aroclor1016 ND 0.032 0.050 - - -
Aroclor1221 ND 0.032 0.050 - - -
Aroclor1232 ND 0.032 0.050 - - -
Aroclor1242 ND 0.032 0.050 - - -
Aroclor1248 ND 0.032 0.050 - - -
Aroclor1254 ND 0.032 0.050 - - -
Aroclor1260 ND 0.032 0.050 - - -
Surrogate Recovery
Decachlorobiphenyl 0.055 0.05 110 70-130
CA ELAP 1644 • NELAP 4033ORELAP
(Cont.)
Quality Control Report
McCampbell Analytical, Inc. 1534 Willow Pass Road, Pittsburg, CA 94565-1701 Toll Free Telephone: (877) 252-9262 / Fax: (925) 252-9269 http://www.mccampbell.com / E-mail: [email protected] "When Quality Counts" Client: Environmental Science Associates
Project: D181242.01; Ukiah Riverside Park
Date Analyzed: 03/25/2022 - 03/29/2022
Date Prepared: 03/23/2022
WorkOrder: 2203E13
BatchID: 241888
Analytical Method: SW8081A/8082
Unit: mg/kg
Sample ID: MB/LCS/LCSD-241888
2203E13-004AMS/MSD
Instrument: GC22, GC23, GC40
Matrix: Soil
Extraction Method: SW3550B
QC Summary Report for SW8081A/8082
Analyte LCS
Result
LCSD
Result
SPK
Val
LCS
%REC
LCSD
%REC
LCS/LCSD
Limits
RPD RPD
Limit
Aldrin 0.055 0.053 0.050 110 106 70-130 3.68 20
a-BHC 0.051 0.050 0.050 102 101 70-130 1.33 20
b-BHC 0.050 0.048 0.050 100 97 70-130 3.08 20
d-BHC 0.056 0.054 0.050 113 108 70-130 4.19 20
g-BHC 0.054 0.053 0.050 107 105 70-130 2.08 20
a-Chlordane 0.053 0.051 0.050 107 101 70-130 5.37 20
g-Chlordane 0.054 0.052 0.050 109 103 70-130 5.21 20
p,p-DDD 0.058 0.054 0.050 117 108 70-130 7.41 20
p,p-DDE 0.055 0.051 0.050 110 103 70-130 6.65 20
p,p-DDT 0.050 0.047 0.050 101 93 70-130 7.76 20
Dieldrin 0.055 0.052 0.050 109 103 70-130 5.84 20
Endosulfan I 0.053 0.050 0.050 106 100 70-130 5.32 20
Endosulfan II 0.052 0.049 0.050 105 98 70-130 6.22 20
Endosulfan sulfate 0.057 0.053 0.050 114 106 70-130 6.91 20 Endrin 0.058 0.055 0.050 117 110 70-130 6.12 20
Endrin aldehyde 0.049 0.046 0.050 98 92 70-130 6.08 20
Endrin ketone 0.053 0.049 0.050 105 98 70-130 6.44 20
Heptachlor 0.056 0.054 0.050 111 107 70-130 3.61 20
Heptachlor epoxide 0.052 0.051 0.050 105 102 70-130 3.12 20 Hexachlorobenzene 0.048 0.047 0.050 95 94 70-130 1.76 20 Hexachlorocyclopentadiene 0.033 0.035 0.050 65 71 50-130 8.02 20 Methoxychlor 0.050 0.046 0.050 100 92 70-130 8.08 20
Aroclor1016 0.15 0.15 0.15 97 99 70-130 1.66 20
Aroclor1260 0.16 0.16 0.15 106 107 70-130 0.849 20
Surrogate Recovery
Decachlorobiphenyl 0.058 0.054 0.050 116 107 70-130 7.63 20 Analyte MS
Result
MSD
Result
SPK
Val
SPKRef
Val
MS
%REC
MSD
%REC
MS/MSD
Limits
RPD RPD
Limit
MS
DF
Aldrin 10 0.040 0.038 0.050 ND<0.010 80 77 60-130 3.73 20 a-BHC 10 0.042 0.041 0.050 ND<0.010 85 82 60-130 3.09 20 b-BHC 10 0.042 0.038 0.050 ND<0.010 84 76 60-130 9.70 20 d-BHC 10 0.044 0.041 0.050 ND<0.010 88 82 60-130 6.28 20 g-BHC 10 0.038 0.036 0.050 ND<0.010 75 73 60-130 2.91 20 a-Chlordane 10 0.042 0.040 0.050 ND<0.010 83 80 60-130 4.19 20 g-Chlordane 10 0.041 0.039 0.050 ND<0.010 81 78 60-130 3.79 20 CA ELAP 1644 • NELAP 4033ORELAP
(Cont.)
Quality Control Report
McCampbell Analytical, Inc. 1534 Willow Pass Road, Pittsburg, CA 94565-1701 Toll Free Telephone: (877) 252-9262 / Fax: (925) 252-9269 http://www.mccampbell.com / E-mail: [email protected] "When Quality Counts" Client: Environmental Science Associates
Project: D181242.01; Ukiah Riverside Park
Date Analyzed: 03/25/2022 - 03/29/2022
Date Prepared: 03/23/2022
WorkOrder: 2203E13
BatchID: 241888
Analytical Method: SW8081A/8082
Unit: mg/kg
Sample ID: MB/LCS/LCSD-241888
2203E13-004AMS/MSD
Instrument: GC22, GC23, GC40
Matrix: Soil
Extraction Method: SW3550B
QC Summary Report for SW8081A/8082
Analyte MS
Result
MSD
Result
SPK
Val
SPKRef
Val
MS
%REC
MSD
%REC
MS/MSD
Limits
RPD RPD
Limit
MS
DF
p,p-DDD 10 0.043 0.040 0.050 ND<0.010 85 79 60-130 7.89 20 p,p-DDE 10 0.046 0.043 0.050 ND<0.010 93 85 60-130 8.39 20 p,p-DDT 10 0.044 0.040 0.050 ND<0.010 88 81 60-130 8.66 20 Dieldrin 10 0.042 0.040 0.050 ND<0.010 84 80 60-130 4.70 20 Endosulfan I 10 0.038 0.036 0.050 ND<0.010 76 72 60-130 4.82 20 Endosulfan II 10 0.041 0.038 0.050 ND<0.010 81 76 60-130 6.04 20 Endosulfan sulfate 10 0.043 0.039 0.050 ND<0.010 85 79 60-130 7.82 20 Endrin 10 0.043 0.041 0.050 ND<0.010 87 83 60-130 4.94 20 Endrin aldehyde 10 0.034 0.032 0.050 ND<0.010 68 65 60-130 4.28 20 Endrin ketone 10 0.034 0.033 0.050 ND<0.010 69 65 60-130 5.31 20 Heptachlor 10 0.044 0.043 0.050 ND<0.010 89 85 60-130 4.12 20 Heptachlor epoxide 10 0.041 0.039 0.050 ND<0.010 81 77 60-130 4.68 20 Hexachlorobenzene 10 0.045 0.044 0.050 ND<0.10 90 87 60-130 3.39 20 Hexachlorocyclopentadiene 10 0.031 0.034 0.050 ND<0.20 62 67 50-130 7.49 20 Methoxychlor 10 0.048 0.044 0.050 ND<0.010 95 89 60-130 7.12 20 Surrogate Recovery
Decachlorobiphenyl 10 0.051 0.047 0.050 101 94 60-130 7.60 20 CA ELAP 1644 • NELAP 4033ORELAP
Quality Control Report
McCampbell Analytical, Inc. 1534 Willow Pass Road, Pittsburg, CA 94565-1701 Toll Free Telephone: (877) 252-9262 / Fax: (925) 252-9269 http://www.mccampbell.com / E-mail: [email protected] "When Quality Counts" Client: Environmental Science Associates
Project: D181242.01; Ukiah Riverside Park
Date Analyzed: 03/24/2022 - 03/28/2022
Date Prepared: 03/22/2022
WorkOrder: 2203E13
BatchID: 241831
Analytical Method: SW8260B
Unit: mg/kg
Sample ID: MB/LCS/LCSD-241831
Instrument: GC16, GC18
Matrix: Soil
Extraction Method: SW5030B
QC Summary Report for SW8260B
Analyte MB
Result
MDL RL SPK
Val
MB SS
%REC
MB SS
Limits
Acetone ND 0.12 0.20 - - -
tert-Amyl methyl ether (TAME) ND 0.0012 0.0050 - - -
Benzene ND 0.00095 0.0050 - - -
Bromobenzene ND 0.0012 0.0050 - - -
Bromochloromethane ND 0.0011 0.0050 - - -
Bromodichloromethane ND 0.00023 0.0050 - - -
Bromoform ND 0.0038 0.0050 - - -
Bromomethane ND 0.0018 0.0050 - - -
2-Butanone (MEK) ND 0.040 0.10 - - -
t-Butyl alcohol (TBA) ND 0.024 0.050 - - -
n-Butyl benzene ND 0.0016 0.0050 - - -
sec-Butyl benzene ND 0.0018 0.0050 - - -
tert-Butyl benzene ND 0.0021 0.0050 - - -
Carbon Disulfide ND 0.0011 0.0050 - - -
Carbon Tetrachloride ND 0.00017 0.0050 - - -
Chlorobenzene ND 0.0012 0.0050 - - -
Chloroethane ND 0.0017 0.0050 - - -
Chloroform ND 0.00032 0.0050 - - -
Chloromethane ND 0.0017 0.0050 - - -
2-Chlorotoluene ND 0.0016 0.0050 - - -
4-Chlorotoluene ND 0.0013 0.0050 - - -
Dibromochloromethane ND 0.00040 0.0050 - - -
1,2-Dibromo-3-chloropropane ND 0.00048 0.00050 - - -
1,2-Dibromoethane (EDB) ND 0.00013 0.00025 - - -
Dibromomethane ND 0.0012 0.0050 - - -
1,2-Dichlorobenzene ND 0.0017 0.0050 - - -
1,3-Dichlorobenzene ND 0.0015 0.0050 - - -
1,4-Dichlorobenzene ND 0.0015 0.0050 - - -
Dichlorodifluoromethane ND 0.00063 0.0050 - - -
1,1-Dichloroethane ND 0.0015 0.0050 - - -
1,2-Dichloroethane (1,2-DCA) ND 0.000070 0.00010 - - -
1,1-Dichloroethene ND 0.00011 0.0050 - - -
cis-1,2-Dichloroethene ND 0.0012 0.0050 - - -
trans-1,2-Dichloroethene ND 0.0012 0.0050 - - -
1,2-Dichloropropane ND 0.0013 0.0050 - - -
1,3-Dichloropropane ND 0.00088 0.0050 - - -
2,2-Dichloropropane ND 0.0019 0.0050 - - -
1,1-Dichloropropene ND 0.0018 0.0050 - - -
CA ELAP 1644 • NELAP 4033ORELAP
(Cont.)
Quality Control Report
McCampbell Analytical, Inc. 1534 Willow Pass Road, Pittsburg, CA 94565-1701 Toll Free Telephone: (877) 252-9262 / Fax: (925) 252-9269 http://www.mccampbell.com / E-mail: [email protected] "When Quality Counts" Client: Environmental Science Associates
Project: D181242.01; Ukiah Riverside Park
Date Analyzed: 03/24/2022 - 03/28/2022
Date Prepared: 03/22/2022
WorkOrder: 2203E13
BatchID: 241831
Analytical Method: SW8260B
Unit: mg/kg
Sample ID: MB/LCS/LCSD-241831
Instrument: GC16, GC18
Matrix: Soil
Extraction Method: SW5030B
QC Summary Report for SW8260B
Analyte MB
Result
MDL RL SPK
Val
MB SS
%REC
MB SS
Limits
cis-1,3-Dichloropropene ND 0.00098 0.0050 - - -
trans-1,3-Dichloropropene ND 0.00097 0.0050 - - -
Diisopropyl ether (DIPE) ND 0.0018 0.0050 - - -
Ethylbenzene ND 0.0011 0.0050 - - -
Ethyl tert-butyl ether (ETBE) ND 0.0014 0.0050 - - -
Freon 113 ND 0.0011 0.0050 - - -
Hexachlorobutadiene ND 0.0012 0.0050 - - -
Hexachloroethane ND 0.00064 0.0050 - - -
2-Hexanone ND 0.0027 0.0050 - - -
Isopropylbenzene ND 0.0018 0.0050 - - -
4-Isopropyl toluene ND 0.0019 0.0050 - - -
Methyl-t-butyl ether (MTBE) ND 0.0015 0.0050 - - -
Methylene chloride ND 0.012 0.020 - - -
4-Methyl-2-pentanone (MIBK) ND 0.0017 0.0050 - - -
Naphthalene ND 0.0030 0.0050 - - -
n-Propyl benzene ND 0.0019 0.0050 - - -
Styrene ND 0.0014 0.0050 - - -
1,1,1,2-Tetrachloroethane ND 0.0013 0.0050 - - -
1,1,2,2-Tetrachloroethane ND 0.00044 0.0050 - - -
Tetrachloroethene ND 0.00029 0.0050 - - -
Toluene ND 0.0016 0.0050 - - -
1,2,3-Trichlorobenzene ND 0.0021 0.0050 - - -
1,2,4-Trichlorobenzene ND 0.0016 0.0050 - - -
1,1,1-Trichloroethane ND 0.0016 0.0050 - - -
1,1,2-Trichloroethane ND 0.0012 0.0050 - - -
Trichloroethene ND 0.0014 0.0050 - - -
Trichlorofluoromethane ND 0.0013 0.0050 - - -
1,2,3-Trichloropropane ND 0.00017 0.00025 - - -
1,2,4-Trimethylbenzene ND 0.0016 0.0050 - - -
1,3,5-Trimethylbenzene ND 0.0017 0.0050 - - -
Vinyl Chloride ND 0.00012 0.00025 - - -
m,p-Xylene ND 0.0026 0.0050 - - -
o-Xylene ND 0.0014 0.0050 - - -
CA ELAP 1644 • NELAP 4033ORELAP
(Cont.)
Quality Control Report
McCampbell Analytical, Inc. 1534 Willow Pass Road, Pittsburg, CA 94565-1701 Toll Free Telephone: (877) 252-9262 / Fax: (925) 252-9269 http://www.mccampbell.com / E-mail: [email protected] "When Quality Counts" Client: Environmental Science Associates
Project: D181242.01; Ukiah Riverside Park
Date Analyzed: 03/24/2022 - 03/28/2022
Date Prepared: 03/22/2022
WorkOrder: 2203E13
BatchID: 241831
Analytical Method: SW8260B
Unit: mg/kg
Sample ID: MB/LCS/LCSD-241831
Instrument: GC16, GC18
Matrix: Soil
Extraction Method: SW5030B
QC Summary Report for SW8260B
Analyte MB
Result
MDL RL SPK
Val
MB SS
%REC
MB SS
Limits
Surrogate Recovery
Dibromofluoromethane 0.14 0.125 109 70-140
Toluene-d8 0.15 0.125 118 70-140
4-BFB 0.013 0.0125 104 70-140
Benzene-d6 0.12 0.1 116 70-140
Ethylbenzene-d10 0.11 0.1 112 70-140
1,2-DCB-d4 0.093 0.1 93 70-140
CA ELAP 1644 • NELAP 4033ORELAP
(Cont.)
Quality Control Report
McCampbell Analytical, Inc. 1534 Willow Pass Road, Pittsburg, CA 94565-1701 Toll Free Telephone: (877) 252-9262 / Fax: (925) 252-9269 http://www.mccampbell.com / E-mail: [email protected] "When Quality Counts" Client: Environmental Science Associates
Project: D181242.01; Ukiah Riverside Park
Date Analyzed: 03/24/2022 - 03/28/2022
Date Prepared: 03/22/2022
WorkOrder: 2203E13
BatchID: 241831
Analytical Method: SW8260B
Unit: mg/kg
Sample ID: MB/LCS/LCSD-241831
Instrument: GC16, GC18
Matrix: Soil
Extraction Method: SW5030B
QC Summary Report for SW8260B
Analyte LCS
Result
LCSD
Result
SPK
Val
LCS
%REC
LCSD
%REC
LCS/LCSD
Limits
RPD RPD
Limit
Acetone 0.51 0.51 0.40 127 126 60-140 0.0937 20
tert-Amyl methyl ether (TAME) 0.016 0.016 0.020 78 80 50-140 1.70 20 Benzene 0.017 0.018 0.020 85 89 60-140 4.44 20
Bromobenzene 0.021 0.020 0.020 105 100 60-140 4.99 20
Bromochloromethane 0.018 0.018 0.020 88 90 60-140 1.83 20 Bromodichloromethane 0.017 0.017 0.020 84 87 60-140 2.80 20 Bromoform 0.014 0.013 0.020 68 66 40-140 3.56 20
Bromomethane 0.017 0.017 0.020 83 86 30-140 3.35 20
2-Butanone (MEK) 0.050 0.049 0.080 62 61 50-140 1.36 20 t-Butyl alcohol (TBA) 0.073 0.074 0.080 91 93 50-140 2.09 20 n-Butyl benzene 0.026 0.026 0.020 129 130 60-150 0.548 20 sec-Butyl benzene 0.024 0.024 0.020 118 119 60-150 1.13 20 tert-Butyl benzene 0.022 0.023 0.020 112 117 60-140 4.90 20 Carbon Disulfide 0.019 0.018 0.020 93 92 50-140 0.335 20 Carbon Tetrachloride 0.017 0.018 0.020 86 90 60-140 3.59 20 Chlorobenzene 0.019 0.018 0.020 95 92 60-140 3.21 20
Chloroethane 0.016 0.017 0.020 78 83 50-140 5.38 20
Chloroform 0.018 0.019 0.020 89 93 60-140 4.38 20
Chloromethane 0.011 0.011 0.020 57 56 20-140 0.987 20
2-Chlorotoluene 0.023 0.022 0.020 117 108 60-140 7.83 20 4-Chlorotoluene 0.021 0.021 0.020 106 104 60-140 1.22 20 Dibromochloromethane 0.016 0.015 0.020 80 77 50-140 4.61 20 1,2-Dibromo-3-chloropropane 0.0076 0.0069 0.0080 94 87 30-140 8.47 20 1,2-Dibromoethane (EDB) 0.019 0.018 0.020 95 91 40-140 4.07 20 Dibromomethane 0.018 0.018 0.020 88 88 60-140 0.795 20
1,2-Dichlorobenzene 0.017 0.017 0.020 85 85 60-140 0.676 20 1,3-Dichlorobenzene 0.021 0.021 0.020 103 103 60-140 0.160 20 1,4-Dichlorobenzene 0.019 0.020 0.020 94 99 60-140 5.05 20 Dichlorodifluoromethane 0.0099 0.0095 0.020 49 47 10-140 4.04 20 1,1-Dichloroethane 0.018 0.019 0.020 88 94 60-140 6.10 20 1,2-Dichloroethane (1,2-DCA) 0.017 0.018 0.020 86 89 60-140 2.95 20 1,1-Dichloroethene 0.015 0.016 0.020 77 80 60-140 4.57 20 cis-1,2-Dichloroethene 0.016 0.017 0.020 82 86 60-140 4.72 20 trans-1,2-Dichloroethene 0.016 0.017 0.020 79 85 60-140 7.58 20 1,2-Dichloropropane 0.017 0.018 0.020 85 89 60-140 3.98 20 1,3-Dichloropropane 0.018 0.018 0.020 91 88 60-140 3.86 20 2,2-Dichloropropane 0.018 0.019 0.020 89 93 60-140 4.75 20 1,1-Dichloropropene 0.018 0.019 0.020 90 93 60-140 3.29 20 CA ELAP 1644 • NELAP 4033ORELAP
(Cont.)
Quality Control Report
McCampbell Analytical, Inc. 1534 Willow Pass Road, Pittsburg, CA 94565-1701 Toll Free Telephone: (877) 252-9262 / Fax: (925) 252-9269 http://www.mccampbell.com / E-mail: [email protected] "When Quality Counts" Client: Environmental Science Associates
Project: D181242.01; Ukiah Riverside Park
Date Analyzed: 03/24/2022 - 03/28/2022
Date Prepared: 03/22/2022
WorkOrder: 2203E13
BatchID: 241831
Analytical Method: SW8260B
Unit: mg/kg
Sample ID: MB/LCS/LCSD-241831
Instrument: GC16, GC18
Matrix: Soil
Extraction Method: SW5030B
QC Summary Report for SW8260B
Analyte LCS
Result
LCSD
Result
SPK
Val
LCS
%REC
LCSD
%REC
LCS/LCSD
Limits
RPD RPD
Limit
cis-1,3-Dichloropropene 0.019 0.018 0.020 93 90 60-140 3.31 20 trans-1,3-Dichloropropene 0.018 0.017 0.020 88 83 60-140 5.23 20 Diisopropyl ether (DIPE) 0.017 0.017 0.020 83 87 60-140 5.43 20 Ethylbenzene 0.019 0.018 0.020 93 92 60-140 1.09 20
Ethyl tert-butyl ether (ETBE) 0.016 0.017 0.020 81 86 60-140 4.97 20 Freon 113 0.016 0.017 0.020 78 84 50-140 7.00 20
Hexachlorobutadiene 0.026 0.028 0.020 132 140 60-140 6.09 20 Hexachloroethane 0.021 0.021 0.020 103 104 60-140 0.979 20 2-Hexanone 0.018 0.017 0.020 92 83 40-140 9.70 20
Isopropylbenzene 0.024 0.024 0.020 119 118 60-140 0.977 20 4-Isopropyl toluene 0.023 0.024 0.020 116 118 60-150 1.65 20 Methyl-t-butyl ether (MTBE) 0.016 0.016 0.020 79 81 50-140 3.35 20 Methylene chloride 0.019 0.020 0.020 97 102 60-140 4.34 20 4-Methyl-2-pentanone (MIBK) 0.018 0.017 0.020 90 83 50-140 8.01 20 Naphthalene 0.012 0.011 0.020 59 54 30-140 9.34 20
n-Propyl benzene 0.025 0.024 0.020 125 119 60-140 4.94 20 Styrene 0.015 0.016 0.020 77 80 60-140 3.46 20
1,1,1,2-Tetrachloroethane 0.018 0.017 0.020 90 87 60-140 3.87 20 1,1,2,2-Tetrachloroethane 0.018 0.017 0.020 90 85 40-140 5.66 20 Tetrachloroethene 0.020 0.020 0.020 101 98 60-140 3.21 20 Toluene 0.018 0.017 0.020 89 87 60-140 2.01 20
1,2,3-Trichlorobenzene 0.014 0.016 0.020 70 78 40-140 9.89 20 1,2,4-Trichlorobenzene 0.018 0.017 0.020 92 85 50-140 7.41 20 1,1,1-Trichloroethane 0.017 0.018 0.020 87 92 60-140 5.59 20 1,1,2-Trichloroethane 0.018 0.017 0.020 88 85 60-140 3.33 20 Trichloroethene 0.019 0.019 0.020 93 96 60-140 3.17 20
Trichlorofluoromethane 0.016 0.017 0.020 82 85 50-140 3.63 20 1,2,3-Trichloropropane 0.021 0.020 0.020 103 99 60-130 3.70 20 1,2,4-Trimethylbenzene 0.021 0.021 0.020 107 106 30-140 0.803 20 1,3,5-Trimethylbenzene 0.022 0.022 0.020 112 112 60-140 0.687 20 Vinyl Chloride 0.013 0.014 0.020 66 70 30-140 4.83 20
m,p-Xylene 0.036 0.036 0.040 90 91 60-140 1.00 20
o-Xylene 0.018 0.018 0.020 88 88 60-140 0.490 20
CA ELAP 1644 • NELAP 4033ORELAP
(Cont.)
Quality Control Report
McCampbell Analytical, Inc. 1534 Willow Pass Road, Pittsburg, CA 94565-1701 Toll Free Telephone: (877) 252-9262 / Fax: (925) 252-9269 http://www.mccampbell.com / E-mail: [email protected] "When Quality Counts" Client: Environmental Science Associates
Project: D181242.01; Ukiah Riverside Park
Date Analyzed: 03/24/2022 - 03/28/2022
Date Prepared: 03/22/2022
WorkOrder: 2203E13
BatchID: 241831
Analytical Method: SW8260B
Unit: mg/kg
Sample ID: MB/LCS/LCSD-241831
Instrument: GC16, GC18
Matrix: Soil
Extraction Method: SW5030B
QC Summary Report for SW8260B
Analyte LCS
Result
LCSD
Result
SPK
Val
LCS
%REC
LCSD
%REC
LCS/LCSD
Limits
RPD RPD
Limit
Surrogate Recovery
Dibromofluoromethane 0.13 0.14 0.12 107 111 70-140 3.38 20 Toluene-d8 0.15 0.15 0.12 119 117 70-140 2.13 20
4-BFB 0.013 0.013 0.012 107 107 70-140 0.597 20
Benzene-d6 0.11 0.11 0.10 106 111 70-140 4.91 20
Ethylbenzene-d10 0.11 0.11 0.10 107 107 70-140 0.113 20 1,2-DCB-d4 0.092 0.092 0.10 92 92 70-140 0.693 20
CA ELAP 1644 • NELAP 4033ORELAP
(Cont.)
Quality Control Report
McCampbell Analytical, Inc. 1534 Willow Pass Road, Pittsburg, CA 94565-1701 Toll Free Telephone: (877) 252-9262 / Fax: (925) 252-9269 http://www.mccampbell.com / E-mail: [email protected] "When Quality Counts" Client: Environmental Science Associates
Project: D181242.01; Ukiah Riverside Park
Date Analyzed: 03/24/2022
Date Prepared: 03/23/2022
WorkOrder: 2203E13
BatchID: 241887
Analytical Method: SW8260B
Unit: mg/kg
Sample ID: MB/LCS/LCSD-241887
Instrument: GC16
Matrix: Soil
Extraction Method: SW5030B
QC Summary Report for SW8260B
Analyte MB
Result
MDL RL SPK
Val
MB SS
%REC
MB SS
Limits
Acetone ND 0.12 0.20 - - -
tert-Amyl methyl ether (TAME) ND 0.0012 0.0050 - - -
Benzene ND 0.00095 0.0050 - - -
Bromobenzene ND 0.0012 0.0050 - - -
Bromochloromethane ND 0.0011 0.0050 - - -
Bromodichloromethane ND 0.00023 0.0050 - - -
Bromoform ND 0.0038 0.0050 - - -
Bromomethane ND 0.0018 0.0050 - - -
2-Butanone (MEK) ND 0.040 0.10 - - -
t-Butyl alcohol (TBA) ND 0.024 0.050 - - -
n-Butyl benzene ND 0.0016 0.0050 - - -
sec-Butyl benzene ND 0.0018 0.0050 - - -
tert-Butyl benzene ND 0.0021 0.0050 - - -
Carbon Disulfide ND 0.0011 0.0050 - - -
Carbon Tetrachloride ND 0.00017 0.0050 - - -
Chlorobenzene ND 0.0012 0.0050 - - -
Chloroethane ND 0.0017 0.0050 - - -
Chloroform ND 0.00032 0.0050 - - -
Chloromethane ND 0.0017 0.0050 - - -
2-Chlorotoluene ND 0.0016 0.0050 - - -
4-Chlorotoluene ND 0.0013 0.0050 - - -
Dibromochloromethane ND 0.00040 0.0050 - - -
1,2-Dibromo-3-chloropropane ND 0.00048 0.00050 - - -
1,2-Dibromoethane (EDB) ND 0.00013 0.00025 - - -
Dibromomethane ND 0.0012 0.0050 - - -
1,2-Dichlorobenzene ND 0.0017 0.0050 - - -
1,3-Dichlorobenzene ND 0.0015 0.0050 - - -
1,4-Dichlorobenzene ND 0.0015 0.0050 - - -
Dichlorodifluoromethane ND 0.00063 0.0050 - - -
1,1-Dichloroethane ND 0.0015 0.0050 - - -
1,2-Dichloroethane (1,2-DCA) ND 0.000070 0.00010 - - -
1,1-Dichloroethene ND 0.00011 0.0050 - - -
cis-1,2-Dichloroethene ND 0.0012 0.0050 - - -
trans-1,2-Dichloroethene ND 0.0012 0.0050 - - -
1,2-Dichloropropane ND 0.0013 0.0050 - - -
1,3-Dichloropropane ND 0.00088 0.0050 - - -
2,2-Dichloropropane ND 0.0019 0.0050 - - -
1,1-Dichloropropene ND 0.0018 0.0050 - - -
CA ELAP 1644 • NELAP 4033ORELAP
(Cont.)
Quality Control Report
McCampbell Analytical, Inc. 1534 Willow Pass Road, Pittsburg, CA 94565-1701 Toll Free Telephone: (877) 252-9262 / Fax: (925) 252-9269 http://www.mccampbell.com / E-mail: [email protected] "When Quality Counts" Client: Environmental Science Associates
Project: D181242.01; Ukiah Riverside Park
Date Analyzed: 03/24/2022
Date Prepared: 03/23/2022
WorkOrder: 2203E13
BatchID: 241887
Analytical Method: SW8260B
Unit: mg/kg
Sample ID: MB/LCS/LCSD-241887
Instrument: GC16
Matrix: Soil
Extraction Method: SW5030B
QC Summary Report for SW8260B
Analyte MB
Result
MDL RL SPK
Val
MB SS
%REC
MB SS
Limits
cis-1,3-Dichloropropene ND 0.00098 0.0050 - - -
trans-1,3-Dichloropropene ND 0.00097 0.0050 - - -
Diisopropyl ether (DIPE) ND 0.0018 0.0050 - - -
Ethylbenzene ND 0.0011 0.0050 - - -
Ethyl tert-butyl ether (ETBE) ND 0.0014 0.0050 - - -
Freon 113 ND 0.0011 0.0050 - - -
Hexachlorobutadiene ND 0.0012 0.0050 - - -
Hexachloroethane ND 0.00064 0.0050 - - -
2-Hexanone ND 0.0027 0.0050 - - -
Isopropylbenzene ND 0.0018 0.0050 - - -
4-Isopropyl toluene ND 0.0019 0.0050 - - -
Methyl-t-butyl ether (MTBE) ND 0.0015 0.0050 - - -
Methylene chloride ND 0.012 0.020 - - -
4-Methyl-2-pentanone (MIBK) ND 0.0017 0.0050 - - -
Naphthalene ND 0.0030 0.0050 - - -
n-Propyl benzene ND 0.0019 0.0050 - - -
Styrene ND 0.0014 0.0050 - - -
1,1,1,2-Tetrachloroethane ND 0.0013 0.0050 - - -
1,1,2,2-Tetrachloroethane ND 0.00044 0.0050 - - -
Tetrachloroethene ND 0.00029 0.0050 - - -
Toluene ND 0.0016 0.0050 - - -
1,2,3-Trichlorobenzene ND 0.0021 0.0050 - - -
1,2,4-Trichlorobenzene ND 0.0016 0.0050 - - -
1,1,1-Trichloroethane ND 0.0016 0.0050 - - -
1,1,2-Trichloroethane ND 0.0012 0.0050 - - -
Trichloroethene ND 0.0014 0.0050 - - -
Trichlorofluoromethane ND 0.0013 0.0050 - - -
1,2,3-Trichloropropane ND 0.00017 0.00025 - - -
1,2,4-Trimethylbenzene ND 0.0016 0.0050 - - -
1,3,5-Trimethylbenzene ND 0.0017 0.0050 - - -
Vinyl Chloride ND 0.00012 0.00025 - - -
m,p-Xylene ND 0.0026 0.0050 - - -
o-Xylene ND 0.0014 0.0050 - - -
CA ELAP 1644 • NELAP 4033ORELAP
(Cont.)
Quality Control Report
McCampbell Analytical, Inc. 1534 Willow Pass Road, Pittsburg, CA 94565-1701 Toll Free Telephone: (877) 252-9262 / Fax: (925) 252-9269 http://www.mccampbell.com / E-mail: [email protected] "When Quality Counts" Client: Environmental Science Associates
Project: D181242.01; Ukiah Riverside Park
Date Analyzed: 03/24/2022
Date Prepared: 03/23/2022
WorkOrder: 2203E13
BatchID: 241887
Analytical Method: SW8260B
Unit: mg/kg
Sample ID: MB/LCS/LCSD-241887
Instrument: GC16
Matrix: Soil
Extraction Method: SW5030B
QC Summary Report for SW8260B
Analyte MB
Result
MDL RL SPK
Val
MB SS
%REC
MB SS
Limits
Surrogate Recovery
Dibromofluoromethane 0.13 0.125 104 70-140
Toluene-d8 0.15 0.125 123 70-140
4-BFB 0.014 0.0125 108 70-140
Benzene-d6 0.11 0.1 115 70-140
Ethylbenzene-d10 0.12 0.1 118 70-140
1,2-DCB-d4 0.091 0.1 91 70-140
CA ELAP 1644 • NELAP 4033ORELAP
(Cont.)
Quality Control Report
McCampbell Analytical, Inc. 1534 Willow Pass Road, Pittsburg, CA 94565-1701 Toll Free Telephone: (877) 252-9262 / Fax: (925) 252-9269 http://www.mccampbell.com / E-mail: [email protected] "When Quality Counts" Client: Environmental Science Associates
Project: D181242.01; Ukiah Riverside Park
Date Analyzed: 03/24/2022
Date Prepared: 03/23/2022
WorkOrder: 2203E13
BatchID: 241887
Analytical Method: SW8260B
Unit: mg/kg
Sample ID: MB/LCS/LCSD-241887
Instrument: GC16
Matrix: Soil
Extraction Method: SW5030B
QC Summary Report for SW8260B
Analyte LCS
Result
LCSD
Result
SPK
Val
LCS
%REC
LCSD
%REC
LCS/LCSD
Limits
RPD RPD
Limit
Acetone 0.48 0.49 0.40 119 123 60-140 3.59 20
tert-Amyl methyl ether (TAME) 0.015 0.016 0.020 75 79 50-140 4.55 20 Benzene 0.017 0.018 0.020 84 89 60-140 5.89 20
Bromobenzene 0.022 0.022 0.020 110 110 60-140 0.0130 20 Bromochloromethane 0.017 0.018 0.020 87 91 60-140 4.51 20 Bromodichloromethane 0.017 0.018 0.020 85 89 60-140 4.78 20 Bromoform 0.013 0.013 0.020 64 66 40-140 3.97 20
Bromomethane 0.014 0.015 0.020 72 77 30-140 6.58 20
2-Butanone (MEK) 0.045 0.046 0.080 56 57 50-140 2.48 20 t-Butyl alcohol (TBA) 0.071 0.075 0.080 89 94 50-140 4.86 20 n-Butyl benzene 0.028 0.031 0.020 138 153,F2 60-150 10.4 20 sec-Butyl benzene 0.026 0.029 0.020 130 143 60-150 9.81 20 tert-Butyl benzene 0.025 0.027 0.020 126 134 60-140 6.11 20 Carbon Disulfide 0.069 0.022 0.020 343,F2 109 50-140 103,F2 20 Carbon Tetrachloride 0.017 0.018 0.020 85 90 60-140 6.57 20 Chlorobenzene 0.018 0.019 0.020 88 97 60-140 9.90 20
Chloroethane 0.014 0.015 0.020 69 74 50-140 6.85 20
Chloroform 0.018 0.019 0.020 89 95 60-140 5.58 20
Chloromethane 0.0086 0.0095 0.020 43 48 20-140 9.66 20
2-Chlorotoluene 0.023 0.025 0.020 116 125 60-140 7.93 20 4-Chlorotoluene 0.023 0.025 0.020 114 123 60-140 7.11 20 Dibromochloromethane 0.015 0.016 0.020 75 79 50-140 4.84 20 1,2-Dibromo-3-chloropropane 0.0067 0.0076 0.0080 84 95 30-140 12.0 20 1,2-Dibromoethane (EDB) 0.018 0.019 0.020 88 93 40-140 5.71 20 Dibromomethane 0.017 0.017 0.020 84 85 60-140 0.430 20
1,2-Dichlorobenzene 0.018 0.019 0.020 89 95 60-140 7.40 20 1,3-Dichlorobenzene 0.022 0.023 0.020 108 115 60-140 6.22 20 1,4-Dichlorobenzene 0.020 0.022 0.020 102 108 60-140 5.31 20 Dichlorodifluoromethane 0.0037 0.0044 0.020 19 22 10-140 16.5 20 1,1-Dichloroethane 0.018 0.019 0.020 89 94 60-140 5.41 20 1,2-Dichloroethane (1,2-DCA) 0.017 0.018 0.020 83 88 60-140 5.60 20 1,1-Dichloroethene 0.014 0.015 0.020 71 77 60-140 8.45 20 cis-1,2-Dichloroethene 0.016 0.017 0.020 82 87 60-140 5.63 20 trans-1,2-Dichloroethene 0.015 0.017 0.020 77 83 60-140 7.43 20 1,2-Dichloropropane 0.017 0.018 0.020 86 91 60-140 5.71 20 1,3-Dichloropropane 0.018 0.018 0.020 88 91 60-140 2.39 20 2,2-Dichloropropane 0.018 0.018 0.020 88 92 60-140 4.75 20 1,1-Dichloropropene 0.018 0.019 0.020 89 94 60-140 4.61 20 CA ELAP 1644 • NELAP 4033ORELAP
(Cont.)
Quality Control Report
McCampbell Analytical, Inc. 1534 Willow Pass Road, Pittsburg, CA 94565-1701 Toll Free Telephone: (877) 252-9262 / Fax: (925) 252-9269 http://www.mccampbell.com / E-mail: [email protected] "When Quality Counts" Client: Environmental Science Associates
Project: D181242.01; Ukiah Riverside Park
Date Analyzed: 03/24/2022
Date Prepared: 03/23/2022
WorkOrder: 2203E13
BatchID: 241887
Analytical Method: SW8260B
Unit: mg/kg
Sample ID: MB/LCS/LCSD-241887
Instrument: GC16
Matrix: Soil
Extraction Method: SW5030B
QC Summary Report for SW8260B
Analyte LCS
Result
LCSD
Result
SPK
Val
LCS
%REC
LCSD
%REC
LCS/LCSD
Limits
RPD RPD
Limit
cis-1,3-Dichloropropene 0.017 0.018 0.020 87 92 60-140 6.59 20 trans-1,3-Dichloropropene 0.016 0.017 0.020 81 87 60-140 6.60 20 Diisopropyl ether (DIPE) 0.017 0.018 0.020 83 88 60-140 6.18 20 Ethylbenzene 0.018 0.020 0.020 91 99 60-140 8.78 20
Ethyl tert-butyl ether (ETBE) 0.016 0.017 0.020 79 85 60-140 6.88 20 Freon 113 0.014 0.016 0.020 72 79 50-140 9.26 20
Hexachlorobutadiene 0.030 0.033 0.020 149,F2 166,F2 60-140 10.8 20 Hexachloroethane 0.022 0.024 0.020 110 121 60-140 9.71 20 2-Hexanone 0.018 0.016 0.020 88 80 40-140 9.52 20
Isopropylbenzene 0.025 0.027 0.020 124 137 60-140 10.3 20 4-Isopropyl toluene 0.025 0.028 0.020 124 138 60-150 10.9 20 Methyl-t-butyl ether (MTBE) 0.015 0.015 0.020 74 77 50-140 5.01 20 Methylene chloride 0.019 0.020 0.020 94 100 60-140 5.17 20 4-Methyl-2-pentanone (MIBK) 0.013 0.017 0.020 66 87 50-140 27.4,F2 20 Naphthalene 0.011 0.011 0.020 53 57 30-140 5.89 20
n-Propyl benzene 0.025 0.029 0.020 126 147,F2 60-140 15.5 20 Styrene 0.016 0.017 0.020 81 83 60-140 2.37 20
1,1,1,2-Tetrachloroethane 0.018 0.019 0.020 89 96 60-140 7.11 20 1,1,2,2-Tetrachloroethane 0.018 0.020 0.020 91 98 40-140 7.36 20 Tetrachloroethene 0.019 0.021 0.020 96 104 60-140 7.90 20 Toluene 0.017 0.018 0.020 84 91 60-140 7.47 20
1,2,3-Trichlorobenzene 0.015 0.016 0.020 74 81 40-140 9.80 20 1,2,4-Trichlorobenzene 0.019 0.019 0.020 97 95 50-140 2.32 20 1,1,1-Trichloroethane 0.017 0.018 0.020 86 92 60-140 7.27 20 1,1,2-Trichloroethane 0.017 0.018 0.020 84 88 60-140 4.51 20 Trichloroethene 0.019 0.020 0.020 94 101 60-140 6.92 20 Trichlorofluoromethane 0.014 0.015 0.020 71 77 50-140 8.19 20 1,2,3-Trichloropropane 0.021 0.022 0.020 104 112 60-130 7.23 20 1,2,4-Trimethylbenzene 0.022 0.025 0.020 111 125 30-140 11.8 20 1,3,5-Trimethylbenzene 0.024 0.025 0.020 118 127 60-140 6.71 20 Vinyl Chloride 0.011 0.012 0.020 54 58 30-140 7.88 20
m,p-Xylene 0.036 0.039 0.040 90 97 60-140 7.95 20
o-Xylene 0.018 0.019 0.020 89 95 60-140 5.80 20
CA ELAP 1644 • NELAP 4033ORELAP
(Cont.)
Quality Control Report
McCampbell Analytical, Inc. 1534 Willow Pass Road, Pittsburg, CA 94565-1701 Toll Free Telephone: (877) 252-9262 / Fax: (925) 252-9269 http://www.mccampbell.com / E-mail: [email protected] "When Quality Counts" Client: Environmental Science Associates
Project: D181242.01; Ukiah Riverside Park
Date Analyzed: 03/24/2022
Date Prepared: 03/23/2022
WorkOrder: 2203E13
BatchID: 241887
Analytical Method: SW8260B
Unit: mg/kg
Sample ID: MB/LCS/LCSD-241887
Instrument: GC16
Matrix: Soil
Extraction Method: SW5030B
QC Summary Report for SW8260B
Analyte LCS
Result
LCSD
Result
SPK
Val
LCS
%REC
LCSD
%REC
LCS/LCSD
Limits
RPD RPD
Limit
Surrogate Recovery
Dibromofluoromethane 0.14 0.14 0.12 109 109 70-140 0.265 20 Toluene-d8 0.15 0.15 0.12 116 118 70-140 1.43 20
4-BFB 0.013 0.014 0.012 104 109 70-140 5.56 20
Benzene-d6 0.11 0.12 0.10 111 118 70-140 6.18 20
Ethylbenzene-d10 0.11 0.12 0.10 107 115 70-140 7.34 20
1,2-DCB-d4 0.089 0.095 0.10 89 95 70-140 6.63 20
CA ELAP 1644 • NELAP 4033ORELAP
Quality Control Report
McCampbell Analytical, Inc. 1534 Willow Pass Road, Pittsburg, CA 94565-1701 Toll Free Telephone: (877) 252-9262 / Fax: (925) 252-9269 http://www.mccampbell.com / E-mail: [email protected] "When Quality Counts" Client: Environmental Science Associates
Project: D181242.01; Ukiah Riverside Park
Date Analyzed: 03/25/2022
Date Prepared: 03/25/2022
WorkOrder: 2203E13
BatchID: 242025
Analytical Method: SW8270C
Unit: mg/Kg
Sample ID: MB/LCS/LCSD-242025
Instrument: GC17, GC53
Matrix: Soil
Extraction Method: SW3550B
QC Summary Report for SW8270C
Analyte MB
Result
MDL RL SPK
Val
MB SS
%REC
MB SS
Limits
Acenaphthene ND 0.00035 0.0013 - - -
Acenaphthylene ND 0.00028 0.0013 - - -
Acetochlor ND 0.044 0.25 - - -
Anthracene ND 0.00057 0.0013 - - -
Benzidine ND 0.36 1.2 - - -
Benzo (a) anthracene ND 0.0036 0.013 - - -
Benzo (a) pyrene ND 0.00070 0.0025 - - -
Benzo (b) fluoranthene ND 0.0013 0.0025 - - -
Benzo (g,h,i) perylene ND 0.00089 0.0025 - - -
Benzo (k) fluoranthene ND 0.0010 0.0025 - - -
Benzyl Alcohol ND 0.55 1.2 - - -
1,1-Biphenyl ND 0.0029 0.013 - - -
Bis (2-chloroethoxy) Methane ND 0.030 0.25 - - -
Bis (2-chloroethyl) Ether ND 0.00036 0.0013 - - -
Bis (2-chloroisopropyl) Ether ND 0.0012 0.0025 - - -
Bis (2-ethylhexyl) Adipate ND 0.085 0.25 - - -
Bis (2-ethylhexyl) Phthalate ND 0.0047 0.013 - - -
4-Bromophenyl Phenyl Ether ND 0.040 0.25 - - -
Butylbenzyl Phthalate ND 0.0036 0.013 - - -
4-Chloroaniline ND 0.00092 0.0013 - - -
4-Chloro-3-methylphenol ND 0.062 0.25 - - -
2-Chloronaphthalene ND 0.041 0.25 - - -
2-Chlorophenol ND 0.0024 0.013 - - -
4-Chlorophenyl Phenyl Ether ND 0.066 0.25 - - -
Chrysene ND 0.00067 0.0025 - - -
Dibenzo (a,h) anthracene ND 0.0011 0.0025 - - -
Dibenzofuran ND 0.000093 0.0013 - - -
1,2-Dichlorobenzene ND 0.053 0.25 - - -
1,3-Dichlorobenzene ND 0.042 0.25 - - -
1,4-Dichlorobenzene ND 0.049 0.25 - - -
3,3-Dichlorobenzidine ND 0.0026 0.013 - - -
2,4-Dichlorophenol ND 0.0012 0.0025 - - -
Diethyl Phthalate ND 0.0040 0.013 - - -
Dimethyl Phthalate ND 0.0019 0.0025 - - -
2,4-Dimethylphenol ND 0.044 0.25 - - -
Di-n-butyl Phthalate ND 0.0044 0.013 - - -
4,6-Dinitro-2-methylphenol ND 0.41 1.2 - - -
2,4-Dinitrophenol ND 0.11 0.25 - - -
CA ELAP 1644 • NELAP 4033ORELAP
(Cont.)
Quality Control Report
McCampbell Analytical, Inc. 1534 Willow Pass Road, Pittsburg, CA 94565-1701 Toll Free Telephone: (877) 252-9262 / Fax: (925) 252-9269 http://www.mccampbell.com / E-mail: [email protected] "When Quality Counts" Client: Environmental Science Associates
Project: D181242.01; Ukiah Riverside Park
Date Analyzed: 03/25/2022
Date Prepared: 03/25/2022
WorkOrder: 2203E13
BatchID: 242025
Analytical Method: SW8270C
Unit: mg/Kg
Sample ID: MB/LCS/LCSD-242025
Instrument: GC17, GC53
Matrix: Soil
Extraction Method: SW3550B
QC Summary Report for SW8270C
Analyte MB
Result
MDL RL SPK
Val
MB SS
%REC
MB SS
Limits
2,4-Dinitrotoluene ND 0.0036 0.013 - - -
2,6-Dinitrotoluene ND 0.062 0.12 - - -
Di-n-octyl Phthalate ND 0.20 0.50 - - -
1,2-Diphenylhydrazine ND 0.038 0.25 - - -
Fluoranthene ND 0.00079 0.0025 - - -
Fluorene ND 0.0010 0.0025 - - -
Hexachlorobenzene ND 0.0012 0.0025 - - -
Hexachlorobutadiene ND 0.00019 0.0013 - - -
Hexachlorocyclopentadiene ND 0.52 1.2 - - -
Hexachloroethane ND 0.0026 0.013 - - -
Indeno (1,2,3-cd) pyrene ND 0.0035 0.013 - - -
Isophorone ND 0.069 0.25 - - -
1-Methylnaphthalene ND 0.00033 0.0013 - - -
2-Methylnaphthalene ND 0.00048 0.0013 - - -
2-Methylphenol (o-Cresol) ND 0.060 0.25 - - -
3 & 4-Methylphenol (m,p-Cresol) ND 0.046 0.25 - - -
Naphthalene ND 0.0031 0.0062 - - -
2-Nitroaniline ND 0.31 1.2 - - -
3-Nitroaniline 0.47,J 0.24 1.2 - - -
4-Nitroaniline 0.36,J 0.28 1.2 - - -
Nitrobenzene ND 0.055 0.25 - - -
2-Nitrophenol ND 0.31 1.2 - - -
4-Nitrophenol ND 0.35 1.2 - - -
N-Nitrosodimethylamine ND 0.22 1.2 - - -
N-Nitrosodi-n-propylamine ND 0.079 0.25 - - -
N-Nitrosodiphenylamine ND 0.029 0.25 - - -
Pentachlorophenol ND 0.029 0.062 - - -
Phenanthrene ND 0.00068 0.0013 - - -
Phenol ND 0.0018 0.0050 - - -
Pyrene ND 0.00063 0.0025 - - -
Pyridine ND 0.046 0.25 - - -
2,3,4,6-Tetrachlorophenol ND 0.079 0.25 - - -
1,2,4-Trichlorobenzene ND 0.046 0.25 - - -
2,4,5-Trichlorophenol ND 0.00059 0.0025 - - -
2,4,6-Trichlorophenol ND 0.00057 0.0025 - - -
CA ELAP 1644 • NELAP 4033ORELAP
(Cont.)
Quality Control Report
McCampbell Analytical, Inc. 1534 Willow Pass Road, Pittsburg, CA 94565-1701 Toll Free Telephone: (877) 252-9262 / Fax: (925) 252-9269 http://www.mccampbell.com / E-mail: [email protected] "When Quality Counts" Client: Environmental Science Associates
Project: D181242.01; Ukiah Riverside Park
Date Analyzed: 03/25/2022
Date Prepared: 03/25/2022
WorkOrder: 2203E13
BatchID: 242025
Analytical Method: SW8270C
Unit: mg/Kg
Sample ID: MB/LCS/LCSD-242025
Instrument: GC17, GC53
Matrix: Soil
Extraction Method: SW3550B
QC Summary Report for SW8270C
Analyte MB
Result
MDL RL SPK
Val
MB SS
%REC
MB SS
Limits
Surrogate Recovery
2-Fluorophenol 1.1 1.25 89 70-130
Phenol-d5 1.0 1.25 81 70-130
Nitrobenzene-d5 1.1 1.25 86 60-130
2-Fluorobiphenyl 1.2 1.25 92 60-130
2,4,6-Tribromophenol 0.70 1.25 56 30-130
4-Terphenyl-d14 1.1 1.25 88 40-130
CA ELAP 1644 • NELAP 4033ORELAP
(Cont.)
Quality Control Report
McCampbell Analytical, Inc. 1534 Willow Pass Road, Pittsburg, CA 94565-1701 Toll Free Telephone: (877) 252-9262 / Fax: (925) 252-9269 http://www.mccampbell.com / E-mail: [email protected] "When Quality Counts" Client: Environmental Science Associates
Project: D181242.01; Ukiah Riverside Park
Date Analyzed: 03/25/2022
Date Prepared: 03/25/2022
WorkOrder: 2203E13
BatchID: 242025
Analytical Method: SW8270C
Unit: mg/Kg
Sample ID: MB/LCS/LCSD-242025
Instrument: GC17, GC53
Matrix: Soil
Extraction Method: SW3550B
QC Summary Report for SW8270C
Analyte LCS
Result
LCSD
Result
SPK
Val
LCS
%REC
LCSD
%REC
LCS/LCSD
Limits
RPD RPD
Limit
Acenaphthene 0.051 0.059 0.062 82 95 60-130 15.2 30
Acenaphthylene 0.052 0.063 0.062 83 101 60-130 19.9 30
Acetochlor 0.84 1.0 1.25 67 82 60-130 19.9 30
Anthracene 0.052 0.062 0.062 84 100 60-130 17.7 30
Benzidine 2.5 2.9 6.25 40 46 20-130 15.2 30
Benzo (a) anthracene 0.053 0.064 0.062 85 102 70-130 18.0 30 Benzo (a) pyrene 0.055 0.064 0.062 88 103 70-130 16.2 30 Benzo (b) fluoranthene 0.050 0.059 0.062 79 95 60-130 17.4 30 Benzo (g,h,i) perylene 0.061 0.072 0.062 98 116 70-130 17.0 30 Benzo (k) fluoranthene 0.050 0.058 0.062 81 93 70-130 14.6 30 Benzyl Alcohol 4.5 5.0 6.25 73 81 70-130 10.4 30
1,1-Biphenyl 0.053 0.064 0.062 85 103 60-130 19.1 30
Bis (2-chloroethoxy) Methane 1.0 1.2 1.25 83 96 70-130 14.4 30 Bis (2-chloroethyl) Ether 0.044 0.052 0.062 71 83 60-130 16.0 30 Bis (2-chloroisopropyl) Ether 0.040 0.040 0.062 65 64 60-130 1.75 30 Bis (2-ethylhexyl) Adipate 0.97 1.2 1.25 78 93 60-130 17.9 30 Bis (2-ethylhexyl) Phthalate 0.050 0.058 0.062 80 93 60-130 15.0 30 4-Bromophenyl Phenyl Ether 1.0 1.2 1.25 84 98 60-130 16.0 30 Butylbenzyl Phthalate 0.053 0.059 0.062 86 95 60-130 10.5 30 4-Chloroaniline 0.043 0.049 0.062 69 79 40-130 13.2 30
4-Chloro-3-methylphenol 0.88 0.97 1.25 71 77 70-130 9.27 30 2-Chloronaphthalene 0.89 1.1 1.25 71 87 60-130 20.0 30
2-Chlorophenol 0.054 0.064 0.062 86 102 60-130 17.0 30
4-Chlorophenyl Phenyl Ether 0.92 1.1 1.25 73 86 70-130 15.4 30 Chrysene 0.053 0.063 0.062 84 101 70-130 18.8 30
Dibenzo (a,h) anthracene 0.064 0.075 0.062 102 120 70-130 16.9 30 Dibenzofuran 0.051 0.060 0.062 81 96 60-130 16.1 30
1,2-Dichlorobenzene 0.89 1.1 1.25 71 85 60-130 17.4 30
1,3-Dichlorobenzene 0.86 1.0 1.25 68 80 60-130 15.1 30
1,4-Dichlorobenzene 0.87 1.0 1.25 70 81 60-130 14.5 30
3,3-Dichlorobenzidine 0.047 0.056 0.062 76 89 40-130 16.9 30 2,4-Dichlorophenol 0.046 0.053 0.062 74 85 60-130 15.0 30 Diethyl Phthalate 0.048 0.058 0.062 76 93 70-130 19.7 30 Dimethyl Phthalate 0.050 0.060 0.062 80 97 70-130 19.1 30 2,4-Dimethylphenol 0.97 1.0 1.25 78 82 70-130 4.87 30
Di-n-butyl Phthalate 0.048 0.057 0.062 77 91 60-130 17.0 30 4,6-Dinitro-2-methylphenol 4.2 5.1 6.25 67 81 20-130 18.3 30 2,4-Dinitrophenol 0.53 0.61 1.25 42 49 15-130 14.0 30
CA ELAP 1644 • NELAP 4033ORELAP
(Cont.)
Quality Control Report
McCampbell Analytical, Inc. 1534 Willow Pass Road, Pittsburg, CA 94565-1701 Toll Free Telephone: (877) 252-9262 / Fax: (925) 252-9269 http://www.mccampbell.com / E-mail: [email protected] "When Quality Counts" Client: Environmental Science Associates
Project: D181242.01; Ukiah Riverside Park
Date Analyzed: 03/25/2022
Date Prepared: 03/25/2022
WorkOrder: 2203E13
BatchID: 242025
Analytical Method: SW8270C
Unit: mg/Kg
Sample ID: MB/LCS/LCSD-242025
Instrument: GC17, GC53
Matrix: Soil
Extraction Method: SW3550B
QC Summary Report for SW8270C
Analyte LCS
Result
LCSD
Result
SPK
Val
LCS
%REC
LCSD
%REC
LCS/LCSD
Limits
RPD RPD
Limit
2,4-Dinitrotoluene 0.073 0.083 0.062 117 133,F5 70-130 12.4 30 2,6-Dinitrotoluene 0.072 0.085 0.062 115 136,F5 60-130 16.6 30 Di-n-octyl Phthalate 0.99 1.1 1.25 79 91 60-130 14.0 30 1,2-Diphenylhydrazine 0.75 0.88 1.25 60 71 60-130 16.9 30 Fluoranthene 0.054 0.063 0.062 87 100 70-130 14.5 30
Fluorene 0.059 0.072 0.062 94 115 60-130 20.4 30
Hexachlorobenzene 0.064 0.075 0.062 102 120 70-130 16.1 30 Hexachlorobutadiene 0.064 0.074 0.062 103 119 70-130 14.2 30 Hexachlorocyclopentadiene 4.6 5.6 6.25 74 90 60-130 19.0 30 Hexachloroethane 0.047 0.055 0.062 76 88 70-130 15.7 30 Indeno (1,2,3-cd) pyrene 0.066 0.070 0.062 105 112 70-130 6.63 30 Isophorone 1.3 1.5 1.25 100 118 60-130 16.0 30
1-Methylnaphthalene 0.055 0.064 0.062 88 102 70-130 14.8 30 2-Methylnaphthalene 0.055 0.064 0.062 89 103 70-130 14.8 30 2-Methylphenol (o-Cresol) 0.86 0.99 1.25 69 79 60-130 14.2 30 3 & 4-Methylphenol (m,p-Cresol) 0.82 0.97 1.25 65 78 60-130 17.4 30 Naphthalene 0.049 0.057 0.062 78 91 70-130 15.4 30
2-Nitroaniline 4.4 4.8 6.25 70 77 70-130 9.31 30
3-Nitroaniline 4.5 5.3 6.25 72 84 50-130 16.1 30
4-Nitroaniline 4.3 4.9 6.25 69 78 60-130 12.2 30
Nitrobenzene 1.0 1.2 1.25 82 95 60-130 14.6 30
2-Nitrophenol 5.8 6.7 6.25 92 107 70-130 15.0 30
4-Nitrophenol 4.2 4.8 6.25 67 77 60-130 14.3 30
N-Nitrosodimethylamine 3.8 4.4 6.25 61,F5 71 70-130 14.4 30 N-Nitrosodi-n-propylamine 0.84 0.81 1.25 68 65 60-130 4.06 30 N-Nitrosodiphenylamine 1.1 1.3 1.25 86 104 70-130 19.3 30 Pentachlorophenol 0.28 0.32 0.31 91 103 50-130 12.2 30
Phenanthrene 0.050 0.058 0.062 80 93 60-130 14.7 30
Phenol 0.20 0.23 0.25 79 93 60-130 16.4 30
Pyrene 0.054 0.063 0.062 86 101 70-130 15.9 30
Pyridine 0.90 0.96 1.25 72 77 60-130 6.79 30
2,3,4,6-Tetrachlorophenol 0.94 1.1 1.25 75 91 60-130 19.2 30 1,2,4-Trichlorobenzene 0.99 1.2 1.25 79 95 60-130 18.0 30 2,4,5-Trichlorophenol 0.055 0.067 0.062 88 107 60-130 19.7 30 2,4,6-Trichlorophenol 0.058 0.070 0.062 92 112 60-130 19.8 30 CA ELAP 1644 • NELAP 4033ORELAP
(Cont.)
Quality Control Report
McCampbell Analytical, Inc. 1534 Willow Pass Road, Pittsburg, CA 94565-1701 Toll Free Telephone: (877) 252-9262 / Fax: (925) 252-9269 http://www.mccampbell.com / E-mail: [email protected] "When Quality Counts" Client: Environmental Science Associates
Project: D181242.01; Ukiah Riverside Park
Date Analyzed: 03/25/2022
Date Prepared: 03/25/2022
WorkOrder: 2203E13
BatchID: 242025
Analytical Method: SW8270C
Unit: mg/Kg
Sample ID: MB/LCS/LCSD-242025
Instrument: GC17, GC53
Matrix: Soil
Extraction Method: SW3550B
QC Summary Report for SW8270C
Analyte LCS
Result
LCSD
Result
SPK
Val
LCS
%REC
LCSD
%REC
LCS/LCSD
Limits
RPD RPD
Limit
Surrogate Recovery
2-Fluorophenol 1.1 1.1 1.25 85 91 70-130 6.99 30
Phenol-d5 0.93 1.0 1.25 75 81 70-130 8.72 30
Nitrobenzene-d5 1.1 1.2 1.25 86 93 60-130 7.60 30
2-Fluorobiphenyl 1.1 1.2 1.25 87 98 60-130 12.1 30
2,4,6-Tribromophenol 0.88 1.0 1.25 71 83 30-130 16.7 30 4-Terphenyl-d14 1.2 1.3 1.25 93 102 40-130 9.90 30
CA ELAP 1644 • NELAP 4033ORELAP
Quality Control Report
McCampbell Analytical, Inc. 1534 Willow Pass Road, Pittsburg, CA 94565-1701 Toll Free Telephone: (877) 252-9262 / Fax: (925) 252-9269 http://www.mccampbell.com / E-mail: [email protected] "When Quality Counts" Client: Environmental Science Associates
Project: D181242.01; Ukiah Riverside Park
Date Analyzed: 03/24/2022
Date Prepared: 03/24/2022
WorkOrder: 2203E13
BatchID: 241869
Analytical Method: SW6020
Unit: mg/kg
Sample ID: MB/LCS/LCSD-241869
Instrument: ICP-MS4
Matrix: Soil
Extraction Method: SW3050B
QC Summary Report for Metals
Analyte MB
Result
MDL RL SPK
Val
MB SS
%REC
MB SS
Limits
Antimony ND 0.16 0.50 - - -
Arsenic ND 0.14 0.50 - - -
Barium ND 0.68 5.0 - - -
Beryllium ND 0.083 0.50 - - -
Cadmium ND 0.094 0.50 - - -
Chromium ND 0.13 0.50 - - -
Cobalt ND 0.069 0.50 - - -
Copper ND 0.23 0.50 - - -
Lead ND 0.069 0.50 - - -
Mercury ND 0.038 0.050 - - -
Molybdenum ND 0.14 0.50 - - -
Nickel ND 0.081 0.50 - - -
Selenium ND 0.32 0.50 - - -
Silver ND 0.11 0.50 - - -
Thallium ND 0.072 0.50 - - -
Vanadium ND 0.15 0.50 - - -
Zinc ND 3.2 5.0 - - -
Surrogate Recovery
Terbium 510 500 101 70-130
CA ELAP 1644 • NELAP 4033ORELAP
(Cont.)
Quality Control Report
McCampbell Analytical, Inc. 1534 Willow Pass Road, Pittsburg, CA 94565-1701 Toll Free Telephone: (877) 252-9262 / Fax: (925) 252-9269 http://www.mccampbell.com / E-mail: [email protected] "When Quality Counts" Client: Environmental Science Associates
Project: D181242.01; Ukiah Riverside Park
Date Analyzed: 03/24/2022
Date Prepared: 03/24/2022
WorkOrder: 2203E13
BatchID: 241869
Analytical Method: SW6020
Unit: mg/kg
Sample ID: MB/LCS/LCSD-241869
Instrument: ICP-MS4
Matrix: Soil
Extraction Method: SW3050B
QC Summary Report for Metals
Analyte LCS
Result
LCSD
Result
SPK
Val
LCS
%REC
LCSD
%REC
LCS/LCSD
Limits
RPD RPD
Limit
Antimony 48 46 50 96 93 75-125 3.84 20
Arsenic 51 49 50 102 99 75-125 2.82 20
Barium 490 470 500 97 94 75-125 3.36 20
Beryllium 45 44 50 89 89 75-125 0.967 20
Cadmium 48 46 50 95 93 75-125 2.36 20
Chromium 49 47 50 97 95 75-125 2.48 20
Cobalt 48 47 50 97 95 75-125 1.87 20
Copper 50 49 50 100 97 75-125 2.82 20
Lead 47 45 50 94 91 75-125 3.72 20
Mercury 1.2 1.2 1.25 97 92 75-125 4.73 20
Molybdenum 49 48 50 98 96 75-125 2.72 20
Nickel 51 49 50 102 98 75-125 3.73 20
Selenium 51 48 50 102 97 75-125 4.82 20
Silver 47 47 50 94 94 75-125 0.221 20
Thallium 49 47 50 98 95 75-125 3.27 20
Vanadium 49 48 50 98 96 75-125 2.35 20
Zinc 500 480 500 100 97 75-125 3.27 20
Surrogate Recovery
Terbium 540 510 500 107 102 70-130 4.47 20
CA ELAP 1644 • NELAP 4033ORELAP
Quality Control Report
McCampbell Analytical, Inc. 1534 Willow Pass Road, Pittsburg, CA 94565-1701 Toll Free Telephone: (877) 252-9262 / Fax: (925) 252-9269 http://www.mccampbell.com / E-mail: [email protected] "When Quality Counts" Client: Environmental Science Associates
Project: D181242.01; Ukiah Riverside Park
Date Analyzed: 03/23/2022 - 03/25/2022
Date Prepared: 03/23/2022
WorkOrder: 2203E13
BatchID: 241885
Analytical Method: SW8021B/8015Bm
Unit: mg/Kg
Sample ID: MB/LCS/LCSD-241885
Instrument: GC19, GC3, GC7
Matrix: Soil
Extraction Method: SW5035
QC Summary Report for SW8021B/8015Bm
Analyte MB
Result
MDL RL SPK
Val
MB SS
%REC
MB SS
Limits
TPH(g) (C6-C12) ND 0.55 1.0 - - -
MTBE 0.0029,J 0.0026 0.050 - - -
Benzene ND 0.0018 0.0050 - - -
Toluene ND 0.0022 0.0050 - - -
Ethylbenzene ND 0.0015 0.0050 - - -
m,p-Xylene ND 0.0026 0.010 - - -
o-Xylene ND 0.00098 0.0050 - - -
Surrogate Recovery
2-Fluorotoluene 0.088 0.1 88 75-134
Analyte LCS
Result
LCSD
Result
SPK
Val
LCS
%REC
LCSD
%REC
LCS/LCSD
Limits
RPD RPD
Limit
TPH(btex) 0.63 0.57 0.60 105 95 82-118 10.2 20
MTBE 0.090 0.091 0.10 90 91 61-119 1.54 20
Benzene 0.10 0.098 0.10 105 98 77-128 6.46 20
Toluene 0.11 0.099 0.10 106 99 74-132 6.60 20
Ethylbenzene 0.11 0.10 0.10 108 103 84-127 5.46 20
m,p-Xylene 0.22 0.21 0.20 108 103 80-120 5.25 20
o-Xylene 0.11 0.10 0.10 107 101 80-120 5.77 20
Surrogate Recovery
2-Fluorotoluene 0.10 0.095 0.10 101 95 75-134 5.34 20
CA ELAP 1644 • NELAP 4033ORELAP
Quality Control Report
McCampbell Analytical, Inc. 1534 Willow Pass Road, Pittsburg, CA 94565-1701 Toll Free Telephone: (877) 252-9262 / Fax: (925) 252-9269 http://www.mccampbell.com / E-mail: [email protected] "When Quality Counts" Client: Environmental Science Associates
Project: D181242.01; Ukiah Riverside Park
Date Analyzed: 03/24/2022 - 03/28/2022
Date Prepared: 03/23/2022
WorkOrder: 2203E13
BatchID: 241886
Analytical Method: SW8015B
Unit: mg/Kg
Sample ID: MB/LCS/LCSD-241886
2203E13-001AMS/MSD
Instrument: GC9a
Matrix: Soil
Extraction Method: SW3550B
QC Report for SW8015B w/out SG Clean-Up
Analyte MB
Result
MDL RL SPK
Val
MB SS
%REC
MB SS
Limits
TPH-Diesel (C10-C23) ND 0.78 2.0 - - -
TPH-Motor Oil (C18-C36) ND 4.6 10 - - -
Surrogate Recovery
C9 21 25 85 70-130
Analyte LCS
Result
LCSD
Result
SPK
Val
LCS
%REC
LCSD
%REC
LCS/LCSD
Limits
RPD RPD
Limit
TPH-Diesel (C10-C23) 35 36 40 89 90 70-130 1.17 20
Surrogate Recovery
C9 21 21 25 85 84 70-130 0.539 20
Analyte MS
Result
MSD
Result
SPK
Val
SPKRef
Val
MS
%REC
MSD
%REC
MS/MSD
Limits
RPD RPD
Limit
MS
DF
TPH-Diesel (C10-C23) 1 31 31 40 2.117 71 73 70-130 1.90 20 Surrogate Recovery
C9 1 21 21 25 86 86 70-130 0.183 20
CA ELAP 1644 • NELAP 4033ORELAP
McCampbell Analytical, Inc.
1534 Willow Pass Rd
Pittsburg, CA 94565-1701
(925) 252-9262
CHAIN-OF-CUSTODY RECORD Page
Lab ID Matrix Collection Date Hold
Requested Tests (See legend below)
Report to:
Michael Burns
2600 Capitol Avenue, Suite 200
Sacramento, CA 95816
(650) 391-4880 FAX:
PO:
03/23/2022
Client ID
Project: D181242.01; Ukiah Riverside Park
WorkOrder: 2203E13
1 of 1
Date Logged:
Date Received: 03/23/2022
1 2 3 4 5 6 7 8 9 10 11 12
Environmental Science Associates
Bill to:
Jeff Trow
Environmental Science Associates
2600 Capitol Avenue, Suite 200
Sacramento, CA 95816
Requested TAT: 5 days;
ClientCode: ESAS
Email: [email protected]
EDF EQuIS Email HardCopy ThirdParty
[email protected]
Excel
CLIP J-flag
cc/3rd Party:
WaterTrax
Detection Summary
Dry-Weight
2203E13-001 S-1 Soil 3/23/2022 09:00 A A A A A A A
2203E13-002 S-2 Soil 3/23/2022 09:34 A A A A A A A
2203E13-003 S-3 Soil 3/23/2022 09:13 A A A A A A A
2203E13-004 S-4 Soil 3/23/2022 09:24 A A A A A A A
Prepared by: Tina Perez
NOTE: Soil samples are discarded 60 days after receipt unless other arrangements are made (Water samples are 30 days).
Hazardous samples will be returned to client or disposed of at client expense.
Comments:
8081PCB_S 8260B_S 8270_SCSM_S CAM17MS_TTLC_S
G-MBTEX_S PRDisposal Fee TPH(DMO)_S
1 2 3 4
5 6 7 8
9 10
Test Legend:
11 12
The following SampIDs: 001A, 002A, 003A, 004A contain testgroup Multi Range_S.
LabID ClientSampID Collection Date
& Time
Date Logged:
Matrix Test Name Containers TAT
/Composites
WORK ORDER SUMMARY
Work Order: 2203E13
Comments
Client Name: ENVIRONMENTAL SCIENCE ASSOCIATES Project: D181242.01; Ukiah Riverside Park QC Level: LEVEL 2
Dry- Hold
Weight
Sub
Out
Bottle &
Preservative
3/23/2022
Sediment
Content
WriteOn EDF Excel EQuIS Email HardCopy ThirdParty J-flag Client Contact: Michael Burns
Contact's Email: [email protected]
WaterTrax
Head Test Due Date
Space
U**
McCampbell Analytical, Inc. 1534 Willow Pass Road, Pittsburg, CA 94565-1701 Toll Free Telephone: (877) 252-9262 / Fax: (925) 252-9269 http://www.mccampbell.com / E-mail: [email protected] "When Quality Counts" 001A S-1 Soil Multi-Range TPH 1 Stainless Steel tube 3/23/2022 9:00 5 days 2"x6"
3/30/2022
SW6020 (CAM 17) 5 days 3/30/2022
SW8270C (SVOCs) 5 days 3/30/2022
SW8260B (VOCs) 5 days 3/30/2022
SW8081A/8082 (OC Pesticides+PCBs) 5 days 3/30/2022
002A S-2 Soil Multi-Range TPH 1 Stainless Steel tube 3/23/2022 9:34 5 days 2"x6"
3/30/2022
SW6020 (CAM 17) 5 days 3/30/2022
SW8270C (SVOCs) 5 days 3/30/2022
SW8260B (VOCs) 5 days 3/30/2022
SW8081A/8082 (OC Pesticides+PCBs) 5 days 3/30/2022
003A S-3 Soil Multi-Range TPH 1 Stainless Steel tube 3/23/2022 9:13 5 days 2"x6"
3/30/2022
SW6020 (CAM 17) 5 days 3/30/2022
SW8270C (SVOCs) 5 days 3/30/2022
SW8260B (VOCs) 5 days 3/30/2022
* STLC and TCLP extractions require 2 days to complete; therefore, all TATs begin after the extraction is completed (i.e., One-day TAT yields results in 3 days from sample submission).
NOTES:
- MAI assumes that all material present in the provided sampling container is considered part of the sample - MAI does not exclude any material from the sample prior to sample preparation unless requested in writing by the client.
U** = An unpreserved container was received for a method that suggests a preservation in order to extend hold time for analysis.
LabID ClientSampID Collection Date
& Time
Date Logged:
Matrix Test Name Containers TAT
/Composites
WORK ORDER SUMMARY
Work Order: 2203E13
Comments
Client Name: ENVIRONMENTAL SCIENCE ASSOCIATES Project: D181242.01; Ukiah Riverside Park QC Level: LEVEL 2
Dry- Hold
Weight
Sub
Out
Bottle &
Preservative
3/23/2022
Sediment
Content
WriteOn EDF Excel EQuIS Email HardCopy ThirdParty J-flag Client Contact: Michael Burns
Contact's Email: [email protected]
WaterTrax
Head Test Due Date
Space
U**
McCampbell Analytical, Inc. 1534 Willow Pass Road, Pittsburg, CA 94565-1701 Toll Free Telephone: (877) 252-9262 / Fax: (925) 252-9269 http://www.mccampbell.com / E-mail: [email protected] "When Quality Counts" 003A S-3 Soil SW8081A/8082 (OC Pesticides+PCBs) 1 Stainless Steel tube 3/23/2022 9:13 5 days 2"x6"
3/30/2022
004A S-4 Soil Multi-Range TPH 1 Stainless Steel tube 3/23/2022 9:24 5 days 2"x6"
3/30/2022
SW6020 (CAM 17) 5 days 3/30/2022
SW8270C (SVOCs) 5 days 3/30/2022
SW8260B (VOCs) 5 days 3/30/2022
SW8081A/8082 (OC Pesticides+PCBs) 5 days 3/30/2022
* STLC and TCLP extractions require 2 days to complete; therefore, all TATs begin after the extraction is completed (i.e., One-day TAT yields results in 3 days from sample submission).
NOTES:
- MAI assumes that all material present in the provided sampling container is considered part of the sample - MAI does not exclude any material from the sample prior to sample preparation unless requested in writing by the client.
U** = An unpreserved container was received for a method that suggests a preservation in order to extend hold time for analysis.
Sample Receipt Checklist
McCampbell Analytical, Inc. 1534 Willow Pass Road, Pittsburg, CA 94565-1701 Toll Free Telephone: (877) 252-9262 / Fax: (925) 252-9269 http://www.mccampbell.com / E-mail: [email protected] "When Quality Counts" Client Name: Environmental Science Associates
WorkOrder №: 2203E13
Date Logged: 3/23/2022
Matrix: Soil Logged by: Tina Perez
Carrier: FedEx
Shipping container/cooler in good condition? Yes No
Custody seals intact on shipping container/cooler? Yes No NA Samples Received on Ice? Yes No
Chain of custody present? Yes No
Chain of custody signed when relinquished and received? Yes No Chain of custody agrees with sample labels? Yes No
Samples in proper containers/bottles? Yes No
Sample containers intact? Yes No
Sufficient sample volume for indicated test? Yes No
All samples received within holding time? Yes No NA
Sample/Temp Blank temperature NA
ZHS conditional analyses: VOA meets zero headspace Yes No NA requirement (VOCs, TPHg/BTEX, RSK)?
pH acceptable upon receipt (Metal: <2; Nitrate 353.2/4500NO3:
<2; 522: <4; 218.7: >8)?
Yes No NA
Temp: 2.1°C
Chain of Custody (COC) Information
Sample IDs noted by Client on COC? Yes No
Date and Time of collection noted by Client on COC? Yes No Sampler's name noted on COC? Yes No
Sample Receipt Information
Sample Preservation and Hold Time (HT) Information
Sample labels checked for correct preservation? Yes No
Project: D181242.01; Ukiah Riverside Park
(Ice Type: WET ICE )
Comments:
pH tested and acceptable upon receipt (200.7: ≤2; 533: 6 - 8; 537.1: 6 - 8)?
Yes No NA
UCMR Samples:
Free Chlorine tested and acceptable upon receipt (<0.1mg/L) [not applicable to 200.7]?
Yes No NA
Date and Time Received: 3/23/2022 12:14
Received by: Tina Perez
COC agrees with Quote? Yes No NA
Custody seals intact on sample bottles? Yes No NA
June 5, 2022
Appendix B
Laboratory Analytical Report
March 23, 2022, Samples
WorkOrder:
Report Created for: Environmental Science Associates
2600 Capitol Avenue, Suite 200
Sacramento, CA 95816
Project Contact: Michael Burns
Project: D181242.01; Ukiah Riverside Park
Project P.O.: D181242.01
Project Received: 05/26/2022
Analytical Report reviewed & approved for release on 06/03/2022 by:
Yen Cao
2205F72
The report shall not be reproduced except in full, without the written approval of the laboratory. The analytical results relate only to the items tested. Results reported conform to the most current NELAP standards, where applicable, unless otherwise stated in a case narrative.
Analytical Report
1534 Willow Pass Rd. Pittsburg, CA 94565 ♦ TEL: (877) 252-9262 ♦ FAX: (925) 252-9269 ♦ www.mccampbell.com CA ELAP 1644 ♦ NELAP 4033 ORELAP
Project Manager
McCampbell Analytical, Inc.
"When Quality Counts"
Glossary of Terms & Qualifier Definitions
Client: Environmental Science Associates
Project: D181242.01; Ukiah Riverside Park
WorkOrder: 2205F72
McCampbell Analytical, Inc. 1534 Willow Pass Road, Pittsburg, CA 94565-1701 Toll Free Telephone: (877) 252-9262 / Fax: (925) 252-9269 http://www.mccampbell.com / E-mail: [email protected] "When Quality Counts" Glossary Abbreviation
%D Serial Dilution Percent Difference
95% Interval 95% Confident Interval
CPT Consumer Product Testing not NELAP Accredited
DF Dilution Factor
DI WET (DISTLC) Waste Extraction Test using DI water
DISS Dissolved (direct analysis of 0.45 µm filtered and acidified water sample) DLT Dilution Test (Serial Dilution)
DUP Duplicate
EDL Estimated Detection Limit
ERS External reference sample. Second source calibration verification.
ITEF International Toxicity Equivalence Factor
LCS Laboratory Control Sample
LQL Lowest Quantitation Level
MB Method Blank
MB % Rec % Recovery of Surrogate in Method Blank, if applicable MDL Method Detection Limit
ML Minimum Level of Quantitation
MS Matrix Spike
MSD Matrix Spike Duplicate
NA Not Applicable
ND Not detected at or above the indicated MDL or RL
NR Data Not Reported due to matrix interference or insufficient sample amount.
PDS Post Digestion Spike
PDSD Post Digestion Spike Duplicate
PF Prep Factor
RD Relative Difference
RL Reporting Limit (The RL is the lowest calibration standard in a multipoint calibration.) RPD Relative Percent Deviation
RRT Relative Retention Time
SPK Val Spike Value
SPKRef Val Spike Reference Value
SPLP Synthetic Precipitation Leachate Procedure
ST Sorbent Tube
TCLP Toxicity Characteristic Leachate Procedure
TEQ Toxicity Equivalents
TZA TimeZone Net Adjustment for sample collected outside of MAI's UTC.
WET (STLC) Waste Extraction Test (Soluble Threshold Limit Concentration)
Glossary of Terms & Qualifier Definitions
Client: Environmental Science Associates
Project: D181242.01; Ukiah Riverside Park
WorkOrder: 2205F72
McCampbell Analytical, Inc. 1534 Willow Pass Road, Pittsburg, CA 94565-1701 Toll Free Telephone: (877) 252-9262 / Fax: (925) 252-9269 http://www.mccampbell.com / E-mail: [email protected] "When Quality Counts" Analytical Qualifiers
J Result is less than the RL/ML but greater than the MDL. The reported concentration is an estimated value.
Analytical Report
McCampbell Analytical, Inc. 1534 Willow Pass Road, Pittsburg, CA 94565-1701 Toll Free Telephone: (877) 252-9262 / Fax: (925) 252-9269 http://www.mccampbell.com / E-mail: [email protected] "When Quality Counts" Client: Environmental Science Associates
Project: D181242.01; Ukiah Riverside Park
Date Received: 05/26/2022 10:57
Date Prepared: 05/26/2022
WorkOrder: 2205F72
Extraction Method: SW3550B
Analytical Method: SW8081A
Unit: mg/kg
Organochlorine Pesticides
S-2-2 2205F72-001A Soil 05/26/2022 06:14 GC40 05312269.d 246327 Analytes Result MDL RL DF Date Analyzed
Client ID Lab ID Matrix Date Collected Instrument Batch ID Aldrin ND 0.00039 0.0010 1 05/31/2022 23:52
a-BHC ND 0.00049 0.0010 1 05/31/2022 23:52
b-BHC ND 0.00027 0.0010 1 05/31/2022 23:52
d-BHC ND 0.00033 0.0010 1 05/31/2022 23:52
g-BHC ND 0.00033 0.0010 1 05/31/2022 23:52
Chlordane (Technical) ND 0.012 0.025 1 05/31/2022 23:52 a-Chlordane ND 0.00043 0.0010 1 05/31/2022 23:52
g-Chlordane ND 0.00034 0.0010 1 05/31/2022 23:52
p,p-DDD ND 0.00041 0.0010 1 05/31/2022 23:52
p,p-DDE ND 0.00029 0.0010 1 05/31/2022 23:52
p,p-DDT ND 0.00039 0.0010 1 05/31/2022 23:52
Dieldrin ND 0.00038 0.0010 1 05/31/2022 23:52
Endosulfan I ND 0.00035 0.0010 1 05/31/2022 23:52
Endosulfan II ND 0.00033 0.0010 1 05/31/2022 23:52
Endosulfan sulfate ND 0.00040 0.0010 1 05/31/2022 23:52 Endrin ND 0.00038 0.0010 1 05/31/2022 23:52
Endrin aldehyde ND 0.00044 0.0010 1 05/31/2022 23:52
Endrin ketone ND 0.00029 0.0010 1 05/31/2022 23:52
Heptachlor ND 0.00030 0.0010 1 05/31/2022 23:52
Heptachlor epoxide ND 0.00030 0.0010 1 05/31/2022 23:52 Hexachlorobenzene ND 0.00070 0.010 1 05/31/2022 23:52
Hexachlorocyclopentadiene ND 0.00052 0.020 1 05/31/2022 23:52 Methoxychlor ND 0.00045 0.0010 1 05/31/2022 23:52
Toxaphene ND 0.033 0.050 1 05/31/2022 23:52
Surrogates REC (%) Limits
Analyst(s): KVE
Decachlorobiphenyl 100 60-130 05/31/2022 23:52
CA ELAP 1644 • NELAP 4033ORELAP
(Cont.)
Analytical Report
McCampbell Analytical, Inc. 1534 Willow Pass Road, Pittsburg, CA 94565-1701 Toll Free Telephone: (877) 252-9262 / Fax: (925) 252-9269 http://www.mccampbell.com / E-mail: [email protected] "When Quality Counts" Client: Environmental Science Associates
Project: D181242.01; Ukiah Riverside Park
Date Received: 05/26/2022 10:57
Date Prepared: 05/26/2022
WorkOrder: 2205F72
Extraction Method: SW3550B
Analytical Method: SW8081A
Unit: mg/kg
Organochlorine Pesticides
S-2-NW-1 2205F72-002A Soil 05/26/2022 07:53 GC40 05312281.d 246327 Analytes Result MDL RL DF Date Analyzed
Client ID Lab ID Matrix Date Collected Instrument Batch ID Aldrin ND 0.00039 0.0010 1 06/01/2022 02:40
a-BHC ND 0.00049 0.0010 1 06/01/2022 02:40
b-BHC ND 0.00027 0.0010 1 06/01/2022 02:40
d-BHC ND 0.00033 0.0010 1 06/01/2022 02:40
g-BHC ND 0.00033 0.0010 1 06/01/2022 02:40
Chlordane (Technical) ND 0.012 0.025 1 06/01/2022 02:40 a-Chlordane ND 0.00043 0.0010 1 06/01/2022 02:40
g-Chlordane ND 0.00034 0.0010 1 06/01/2022 02:40
p,p-DDD ND 0.00041 0.0010 1 06/01/2022 02:40
p,p-DDE ND 0.00029 0.0010 1 06/01/2022 02:40
p,p-DDT ND 0.00039 0.0010 1 06/01/2022 02:40
Dieldrin ND 0.00038 0.0010 1 06/01/2022 02:40
Endosulfan I ND 0.00035 0.0010 1 06/01/2022 02:40
Endosulfan II ND 0.00033 0.0010 1 06/01/2022 02:40
Endosulfan sulfate ND 0.00040 0.0010 1 06/01/2022 02:40 Endrin ND 0.00038 0.0010 1 06/01/2022 02:40
Endrin aldehyde ND 0.00044 0.0010 1 06/01/2022 02:40
Endrin ketone ND 0.00029 0.0010 1 06/01/2022 02:40
Heptachlor ND 0.00030 0.0010 1 06/01/2022 02:40
Heptachlor epoxide ND 0.00030 0.0010 1 06/01/2022 02:40 Hexachlorobenzene ND 0.00070 0.010 1 06/01/2022 02:40
Hexachlorocyclopentadiene ND 0.00052 0.020 1 06/01/2022 02:40 Methoxychlor ND 0.00045 0.0010 1 06/01/2022 02:40
Toxaphene ND 0.033 0.050 1 06/01/2022 02:40
Surrogates REC (%) Limits
Analyst(s): KVE
Decachlorobiphenyl 104 60-130 06/01/2022 02:40
CA ELAP 1644 • NELAP 4033ORELAP
(Cont.)
Analytical Report
McCampbell Analytical, Inc. 1534 Willow Pass Road, Pittsburg, CA 94565-1701 Toll Free Telephone: (877) 252-9262 / Fax: (925) 252-9269 http://www.mccampbell.com / E-mail: [email protected] "When Quality Counts" Client: Environmental Science Associates
Project: D181242.01; Ukiah Riverside Park
Date Received: 05/26/2022 10:57
Date Prepared: 05/26/2022
WorkOrder: 2205F72
Extraction Method: SW3550B
Analytical Method: SW8081A
Unit: mg/kg
Organochlorine Pesticides
S-2-NW-2.25 2205F72-003A Soil 05/26/2022 08:02 GC40 06022265.d 246327 Analytes Result MDL RL DF Date Analyzed
Client ID Lab ID Matrix Date Collected Instrument Batch ID Aldrin ND 0.00039 0.0010 1 06/03/2022 01:09
a-BHC ND 0.00049 0.0010 1 06/03/2022 01:09
b-BHC ND 0.00027 0.0010 1 06/03/2022 01:09
d-BHC ND 0.00033 0.0010 1 06/03/2022 01:09
g-BHC ND 0.00033 0.0010 1 06/03/2022 01:09
Chlordane (Technical) ND 0.012 0.025 1 06/03/2022 01:09 a-Chlordane ND 0.00043 0.0010 1 06/03/2022 01:09
g-Chlordane ND 0.00034 0.0010 1 06/03/2022 01:09
p,p-DDD ND 0.00041 0.0010 1 06/03/2022 01:09
p,p-DDE ND 0.00029 0.0010 1 06/03/2022 01:09
p,p-DDT ND 0.00039 0.0010 1 06/03/2022 01:09
Dieldrin ND 0.00038 0.0010 1 06/03/2022 01:09
Endosulfan I ND 0.00035 0.0010 1 06/03/2022 01:09
Endosulfan II ND 0.00033 0.0010 1 06/03/2022 01:09
Endosulfan sulfate ND 0.00040 0.0010 1 06/03/2022 01:09 Endrin ND 0.00038 0.0010 1 06/03/2022 01:09
Endrin aldehyde ND 0.00044 0.0010 1 06/03/2022 01:09
Endrin ketone ND 0.00029 0.0010 1 06/03/2022 01:09
Heptachlor ND 0.00030 0.0010 1 06/03/2022 01:09
Heptachlor epoxide ND 0.00030 0.0010 1 06/03/2022 01:09 Hexachlorobenzene ND 0.00070 0.010 1 06/03/2022 01:09
Hexachlorocyclopentadiene ND 0.00052 0.020 1 06/03/2022 01:09 Methoxychlor ND 0.00045 0.0010 1 06/03/2022 01:09
Toxaphene ND 0.033 0.050 1 06/03/2022 01:09
Surrogates REC (%) Limits
Analyst(s): CK
Decachlorobiphenyl 100 60-130 06/03/2022 01:09
CA ELAP 1644 • NELAP 4033ORELAP
(Cont.)
Analytical Report
McCampbell Analytical, Inc. 1534 Willow Pass Road, Pittsburg, CA 94565-1701 Toll Free Telephone: (877) 252-9262 / Fax: (925) 252-9269 http://www.mccampbell.com / E-mail: [email protected] "When Quality Counts" Client: Environmental Science Associates
Project: D181242.01; Ukiah Riverside Park
Date Received: 05/26/2022 10:57
Date Prepared: 05/26/2022
WorkOrder: 2205F72
Extraction Method: SW3550B
Analytical Method: SW8081A
Unit: mg/kg
Organochlorine Pesticides
S-2-SW-1 2205F72-004A Soil 05/26/2022 07:16 GC40 05312284.d 246327 Analytes Result MDL RL DF Date Analyzed
Client ID Lab ID Matrix Date Collected Instrument Batch ID Aldrin ND 0.00039 0.0010 1 06/01/2022 03:21
a-BHC ND 0.00049 0.0010 1 06/01/2022 03:21
b-BHC ND 0.00027 0.0010 1 06/01/2022 03:21
d-BHC ND 0.00033 0.0010 1 06/01/2022 03:21
g-BHC ND 0.00033 0.0010 1 06/01/2022 03:21
Chlordane (Technical) ND 0.012 0.025 1 06/01/2022 03:21 a-Chlordane ND 0.00043 0.0010 1 06/01/2022 03:21
g-Chlordane ND 0.00034 0.0010 1 06/01/2022 03:21
p,p-DDD ND 0.00041 0.0010 1 06/01/2022 03:21
p,p-DDE ND 0.00029 0.0010 1 06/01/2022 03:21
p,p-DDT ND 0.00039 0.0010 1 06/01/2022 03:21
Dieldrin ND 0.00038 0.0010 1 06/01/2022 03:21
Endosulfan I ND 0.00035 0.0010 1 06/01/2022 03:21
Endosulfan II ND 0.00033 0.0010 1 06/01/2022 03:21
Endosulfan sulfate ND 0.00040 0.0010 1 06/01/2022 03:21 Endrin ND 0.00038 0.0010 1 06/01/2022 03:21
Endrin aldehyde ND 0.00044 0.0010 1 06/01/2022 03:21
Endrin ketone ND 0.00029 0.0010 1 06/01/2022 03:21
Heptachlor ND 0.00030 0.0010 1 06/01/2022 03:21
Heptachlor epoxide ND 0.00030 0.0010 1 06/01/2022 03:21 Hexachlorobenzene ND 0.00070 0.010 1 06/01/2022 03:21
Hexachlorocyclopentadiene ND 0.00052 0.020 1 06/01/2022 03:21 Methoxychlor ND 0.00045 0.0010 1 06/01/2022 03:21
Toxaphene ND 0.033 0.050 1 06/01/2022 03:21
Surrogates REC (%) Limits
Analyst(s): KVE
Decachlorobiphenyl 105 60-130 06/01/2022 03:21
CA ELAP 1644 • NELAP 4033ORELAP
(Cont.)
Analytical Report
McCampbell Analytical, Inc. 1534 Willow Pass Road, Pittsburg, CA 94565-1701 Toll Free Telephone: (877) 252-9262 / Fax: (925) 252-9269 http://www.mccampbell.com / E-mail: [email protected] "When Quality Counts" Client: Environmental Science Associates
Project: D181242.01; Ukiah Riverside Park
Date Received: 05/26/2022 10:57
Date Prepared: 05/26/2022
WorkOrder: 2205F72
Extraction Method: SW3550B
Analytical Method: SW8081A
Unit: mg/kg
Organochlorine Pesticides
S-2-SW-1.75 2205F72-005A Soil 05/26/2022 07:27 GC40 05312283.d 246327 Analytes Result MDL RL DF Date Analyzed
Client ID Lab ID Matrix Date Collected Instrument Batch ID Aldrin ND 0.00039 0.0010 1 06/01/2022 03:07
a-BHC ND 0.00049 0.0010 1 06/01/2022 03:07
b-BHC ND 0.00027 0.0010 1 06/01/2022 03:07
d-BHC ND 0.00033 0.0010 1 06/01/2022 03:07
g-BHC ND 0.00033 0.0010 1 06/01/2022 03:07
Chlordane (Technical) ND 0.012 0.025 1 06/01/2022 03:07 a-Chlordane ND 0.00043 0.0010 1 06/01/2022 03:07
g-Chlordane ND 0.00034 0.0010 1 06/01/2022 03:07
p,p-DDD ND 0.00041 0.0010 1 06/01/2022 03:07
p,p-DDE ND 0.00029 0.0010 1 06/01/2022 03:07
p,p-DDT ND 0.00039 0.0010 1 06/01/2022 03:07
Dieldrin ND 0.00038 0.0010 1 06/01/2022 03:07
Endosulfan I ND 0.00035 0.0010 1 06/01/2022 03:07
Endosulfan II ND 0.00033 0.0010 1 06/01/2022 03:07
Endosulfan sulfate ND 0.00040 0.0010 1 06/01/2022 03:07 Endrin ND 0.00038 0.0010 1 06/01/2022 03:07
Endrin aldehyde ND 0.00044 0.0010 1 06/01/2022 03:07
Endrin ketone ND 0.00029 0.0010 1 06/01/2022 03:07
Heptachlor ND 0.00030 0.0010 1 06/01/2022 03:07
Heptachlor epoxide ND 0.00030 0.0010 1 06/01/2022 03:07 Hexachlorobenzene ND 0.00070 0.010 1 06/01/2022 03:07
Hexachlorocyclopentadiene ND 0.00052 0.020 1 06/01/2022 03:07 Methoxychlor ND 0.00045 0.0010 1 06/01/2022 03:07
Toxaphene ND 0.033 0.050 1 06/01/2022 03:07
Surrogates REC (%) Limits
Analyst(s): KVE
Decachlorobiphenyl 102 60-130 06/01/2022 03:07
CA ELAP 1644 • NELAP 4033ORELAP
(Cont.)
Analytical Report
McCampbell Analytical, Inc. 1534 Willow Pass Road, Pittsburg, CA 94565-1701 Toll Free Telephone: (877) 252-9262 / Fax: (925) 252-9269 http://www.mccampbell.com / E-mail: [email protected] "When Quality Counts" Client: Environmental Science Associates
Project: D181242.01; Ukiah Riverside Park
Date Received: 05/26/2022 10:57
Date Prepared: 05/26/2022
WorkOrder: 2205F72
Extraction Method: SW3550B
Analytical Method: SW8081A
Unit: mg/kg
Organochlorine Pesticides
S-2-SE-1 2205F72-006A Soil 05/26/2022 06:55 GC40 05312279.d 246327 Analytes Result MDL RL DF Date Analyzed
Client ID Lab ID Matrix Date Collected Instrument Batch ID Aldrin ND 0.00039 0.0010 1 06/01/2022 02:12
a-BHC ND 0.00049 0.0010 1 06/01/2022 02:12
b-BHC ND 0.00027 0.0010 1 06/01/2022 02:12
d-BHC ND 0.00033 0.0010 1 06/01/2022 02:12
g-BHC ND 0.00033 0.0010 1 06/01/2022 02:12
Chlordane (Technical) ND 0.012 0.025 1 06/01/2022 02:12 a-Chlordane ND 0.00043 0.0010 1 06/01/2022 02:12
g-Chlordane ND 0.00034 0.0010 1 06/01/2022 02:12
p,p-DDD ND 0.00041 0.0010 1 06/01/2022 02:12
p,p-DDE ND 0.00029 0.0010 1 06/01/2022 02:12
p,p-DDT ND 0.00039 0.0010 1 06/01/2022 02:12
Dieldrin ND 0.00038 0.0010 1 06/01/2022 02:12
Endosulfan I ND 0.00035 0.0010 1 06/01/2022 02:12
Endosulfan II ND 0.00033 0.0010 1 06/01/2022 02:12
Endosulfan sulfate ND 0.00040 0.0010 1 06/01/2022 02:12 Endrin ND 0.00038 0.0010 1 06/01/2022 02:12
Endrin aldehyde ND 0.00044 0.0010 1 06/01/2022 02:12
Endrin ketone ND 0.00029 0.0010 1 06/01/2022 02:12
Heptachlor ND 0.00030 0.0010 1 06/01/2022 02:12
Heptachlor epoxide ND 0.00030 0.0010 1 06/01/2022 02:12 Hexachlorobenzene ND 0.00070 0.010 1 06/01/2022 02:12
Hexachlorocyclopentadiene ND 0.00052 0.020 1 06/01/2022 02:12 Methoxychlor ND 0.00045 0.0010 1 06/01/2022 02:12
Toxaphene ND 0.033 0.050 1 06/01/2022 02:12
Surrogates REC (%) Limits
Analyst(s): KVE
Decachlorobiphenyl 111 60-130 06/01/2022 02:12
CA ELAP 1644 • NELAP 4033ORELAP
(Cont.)
Analytical Report
McCampbell Analytical, Inc. 1534 Willow Pass Road, Pittsburg, CA 94565-1701 Toll Free Telephone: (877) 252-9262 / Fax: (925) 252-9269 http://www.mccampbell.com / E-mail: [email protected] "When Quality Counts" Client: Environmental Science Associates
Project: D181242.01; Ukiah Riverside Park
Date Received: 05/26/2022 10:57
Date Prepared: 05/26/2022
WorkOrder: 2205F72
Extraction Method: SW3550B
Analytical Method: SW8081A
Unit: mg/kg
Organochlorine Pesticides
S-2-SE-1.75 2205F72-007A Soil 05/26/2022 07:01 GC40 05312280.d 246327 Analytes Result MDL RL DF Date Analyzed
Client ID Lab ID Matrix Date Collected Instrument Batch ID Aldrin ND 0.00039 0.0010 1 06/01/2022 02:25
a-BHC ND 0.00049 0.0010 1 06/01/2022 02:25
b-BHC ND 0.00027 0.0010 1 06/01/2022 02:25
d-BHC ND 0.00033 0.0010 1 06/01/2022 02:25
g-BHC ND 0.00033 0.0010 1 06/01/2022 02:25
Chlordane (Technical) ND 0.012 0.025 1 06/01/2022 02:25 a-Chlordane ND 0.00043 0.0010 1 06/01/2022 02:25
g-Chlordane ND 0.00034 0.0010 1 06/01/2022 02:25
p,p-DDD ND 0.00041 0.0010 1 06/01/2022 02:25
p,p-DDE ND 0.00029 0.0010 1 06/01/2022 02:25
p,p-DDT ND 0.00039 0.0010 1 06/01/2022 02:25
Dieldrin ND 0.00038 0.0010 1 06/01/2022 02:25
Endosulfan I ND 0.00035 0.0010 1 06/01/2022 02:25
Endosulfan II ND 0.00033 0.0010 1 06/01/2022 02:25
Endosulfan sulfate ND 0.00040 0.0010 1 06/01/2022 02:25 Endrin ND 0.00038 0.0010 1 06/01/2022 02:25
Endrin aldehyde ND 0.00044 0.0010 1 06/01/2022 02:25
Endrin ketone ND 0.00029 0.0010 1 06/01/2022 02:25
Heptachlor ND 0.00030 0.0010 1 06/01/2022 02:25
Heptachlor epoxide ND 0.00030 0.0010 1 06/01/2022 02:25 Hexachlorobenzene ND 0.00070 0.010 1 06/01/2022 02:25
Hexachlorocyclopentadiene ND 0.00052 0.020 1 06/01/2022 02:25 Methoxychlor ND 0.00045 0.0010 1 06/01/2022 02:25
Toxaphene ND 0.033 0.050 1 06/01/2022 02:25
Surrogates REC (%) Limits
Analyst(s): KVE
Decachlorobiphenyl 103 60-130 06/01/2022 02:25
CA ELAP 1644 • NELAP 4033ORELAP
(Cont.)
Analytical Report
McCampbell Analytical, Inc. 1534 Willow Pass Road, Pittsburg, CA 94565-1701 Toll Free Telephone: (877) 252-9262 / Fax: (925) 252-9269 http://www.mccampbell.com / E-mail: [email protected] "When Quality Counts" Client: Environmental Science Associates
Project: D181242.01; Ukiah Riverside Park
Date Received: 05/26/2022 10:57
Date Prepared: 05/26/2022
WorkOrder: 2205F72
Extraction Method: SW3550B
Analytical Method: SW8081A
Unit: mg/kg
Organochlorine Pesticides
S-2-NE-1 2205F72-008A Soil 05/26/2022 06:25 GC40 06022266.d 246327 Analytes Result Qualifiers MDL RL DF Date Analyzed
Client ID Lab ID Matrix Date Collected Instrument Batch ID Aldrin ND 0.00039 0.0010 1 06/03/2022 01:24
a-BHC ND 0.00049 0.0010 1 06/03/2022 01:24
b-BHC ND 0.00027 0.0010 1 06/03/2022 01:24
d-BHC ND 0.00033 0.0010 1 06/03/2022 01:24
g-BHC ND 0.00033 0.0010 1 06/03/2022 01:24
Chlordane (Technical) ND 0.012 0.025 1 06/03/2022 01:24 a-Chlordane ND 0.00043 0.0010 1 06/03/2022 01:24
g-Chlordane ND 0.00034 0.0010 1 06/03/2022 01:24
p,p-DDD 0.00044 J 0.00041 0.0010 1 06/03/2022 01:24
p,p-DDE 0.00094 J 0.00029 0.0010 1 06/03/2022 01:24
p,p-DDT 0.0013 0.00039 0.0010 1 06/03/2022 01:24
Dieldrin ND 0.00038 0.0010 1 06/03/2022 01:24
Endosulfan I ND 0.00035 0.0010 1 06/03/2022 01:24
Endosulfan II ND 0.00033 0.0010 1 06/03/2022 01:24
Endosulfan sulfate ND 0.00040 0.0010 1 06/03/2022 01:24 Endrin ND 0.00038 0.0010 1 06/03/2022 01:24
Endrin aldehyde ND 0.00044 0.0010 1 06/03/2022 01:24
Endrin ketone ND 0.00029 0.0010 1 06/03/2022 01:24
Heptachlor ND 0.00030 0.0010 1 06/03/2022 01:24
Heptachlor epoxide ND 0.00030 0.0010 1 06/03/2022 01:24 Hexachlorobenzene ND 0.00070 0.010 1 06/03/2022 01:24
Hexachlorocyclopentadiene ND 0.00052 0.020 1 06/03/2022 01:24 Methoxychlor ND 0.00045 0.0010 1 06/03/2022 01:24
Toxaphene ND 0.033 0.050 1 06/03/2022 01:24
Surrogates REC (%) Limits
Analyst(s): CK
Decachlorobiphenyl 99 60-130 06/03/2022 01:24
CA ELAP 1644 • NELAP 4033ORELAP
(Cont.)
Analytical Report
McCampbell Analytical, Inc. 1534 Willow Pass Road, Pittsburg, CA 94565-1701 Toll Free Telephone: (877) 252-9262 / Fax: (925) 252-9269 http://www.mccampbell.com / E-mail: [email protected] "When Quality Counts" Client: Environmental Science Associates
Project: D181242.01; Ukiah Riverside Park
Date Received: 05/26/2022 10:57
Date Prepared: 05/26/2022
WorkOrder: 2205F72
Extraction Method: SW3550B
Analytical Method: SW8081A
Unit: mg/kg
Organochlorine Pesticides
S-2-NE-2 2205F72-009A Soil 05/26/2022 06:35 GC40 05312282.d 246327 Analytes Result Qualifiers MDL RL DF Date Analyzed
Client ID Lab ID Matrix Date Collected Instrument Batch ID Aldrin ND 0.00039 0.0010 1 06/01/2022 02:54
a-BHC ND 0.00049 0.0010 1 06/01/2022 02:54
b-BHC ND 0.00027 0.0010 1 06/01/2022 02:54
d-BHC ND 0.00033 0.0010 1 06/01/2022 02:54
g-BHC ND 0.00033 0.0010 1 06/01/2022 02:54
Chlordane (Technical) ND 0.012 0.025 1 06/01/2022 02:54 a-Chlordane ND 0.00043 0.0010 1 06/01/2022 02:54
g-Chlordane ND 0.00034 0.0010 1 06/01/2022 02:54
p,p-DDD ND 0.00041 0.0010 1 06/01/2022 02:54
p,p-DDE 0.00065 J 0.00029 0.0010 1 06/01/2022 02:54
p,p-DDT ND 0.00039 0.0010 1 06/01/2022 02:54
Dieldrin ND 0.00038 0.0010 1 06/01/2022 02:54
Endosulfan I ND 0.00035 0.0010 1 06/01/2022 02:54
Endosulfan II ND 0.00033 0.0010 1 06/01/2022 02:54
Endosulfan sulfate ND 0.00040 0.0010 1 06/01/2022 02:54 Endrin ND 0.00038 0.0010 1 06/01/2022 02:54
Endrin aldehyde ND 0.00044 0.0010 1 06/01/2022 02:54
Endrin ketone ND 0.00029 0.0010 1 06/01/2022 02:54
Heptachlor ND 0.00030 0.0010 1 06/01/2022 02:54
Heptachlor epoxide ND 0.00030 0.0010 1 06/01/2022 02:54 Hexachlorobenzene ND 0.00070 0.010 1 06/01/2022 02:54
Hexachlorocyclopentadiene ND 0.00052 0.020 1 06/01/2022 02:54 Methoxychlor ND 0.00045 0.0010 1 06/01/2022 02:54
Toxaphene ND 0.033 0.050 1 06/01/2022 02:54
Surrogates REC (%) Limits
Analyst(s): KVE
Decachlorobiphenyl 104 60-130 06/01/2022 02:54
CA ELAP 1644 • NELAP 4033ORELAP
Analytical Report
McCampbell Analytical, Inc. 1534 Willow Pass Road, Pittsburg, CA 94565-1701 Toll Free Telephone: (877) 252-9262 / Fax: (925) 252-9269 http://www.mccampbell.com / E-mail: [email protected] "When Quality Counts" Client: Environmental Science Associates
Project: D181242.01; Ukiah Riverside Park
Date Received: 05/26/2022 10:57
Date Prepared: 05/27/2022
WorkOrder: 2205F72
Extraction Method: SW3050B
Analytical Method: SW6020
Unit: mg/Kg
Lead
S-2-2 2205F72-001A Soil 05/26/2022 06:14 ICP-MS4 132SMPL.d 246328 Analytes Result MDL RL DF Date Analyzed
Client ID Lab ID Matrix Date Collected Instrument Batch ID Lead 19 0.069 0.50 1 05/31/2022 12:17
Surrogates REC (%) Limits
Analyst(s): AL
Terbium 103 70-130 05/31/2022 12:17
S-2-NW-1 2205F72-002A Soil 05/26/2022 07:53 ICP-MS4 159SMPL.d 246328 Analytes Result MDL RL DF Date Analyzed
Client ID Lab ID Matrix Date Collected Instrument Batch ID Lead 25 0.069 0.50 1 05/31/2022 14:03
Surrogates REC (%) Limits
Analyst(s): WV
Terbium 105 70-130 05/31/2022 14:03
S-2-NW-2.25 2205F72-003A Soil 05/26/2022 08:02 ICP-MS4 167SMPL.d 246328 Analytes Result MDL RL DF Date Analyzed
Client ID Lab ID Matrix Date Collected Instrument Batch ID Lead 14 0.069 0.50 1 05/31/2022 14:34
Surrogates REC (%) Limits
Analyst(s): WV
Terbium 107 70-130 05/31/2022 14:34
S-2-SW-1 2205F72-004A Soil 05/26/2022 07:16 ICP-MS4 168SMPL.d 246328 Analytes Result MDL RL DF Date Analyzed
Client ID Lab ID Matrix Date Collected Instrument Batch ID Lead 80 0.069 0.50 1 05/31/2022 14:38
Surrogates REC (%) Limits
Analyst(s): WV
Terbium 113 70-130 05/31/2022 14:38
CA ELAP 1644 • NELAP 4033ORELAP
(Cont.)
Analytical Report
McCampbell Analytical, Inc. 1534 Willow Pass Road, Pittsburg, CA 94565-1701 Toll Free Telephone: (877) 252-9262 / Fax: (925) 252-9269 http://www.mccampbell.com / E-mail: [email protected] "When Quality Counts" Client: Environmental Science Associates
Project: D181242.01; Ukiah Riverside Park
Date Received: 05/26/2022 10:57
Date Prepared: 05/27/2022
WorkOrder: 2205F72
Extraction Method: SW3050B
Analytical Method: SW6020
Unit: mg/Kg
Lead
S-2-SW-1.75 2205F72-005A Soil 05/26/2022 07:27 ICP-MS4 169SMPL.d 246328 Analytes Result MDL RL DF Date Analyzed
Client ID Lab ID Matrix Date Collected Instrument Batch ID Lead 23 0.069 0.50 1 05/31/2022 14:42
Surrogates REC (%) Limits
Analyst(s): WV
Terbium 112 70-130 05/31/2022 14:42
S-2-SE-1 2205F72-006A Soil 05/26/2022 06:55 ICP-MS5 161SMPL.d 246328 Analytes Result MDL RL DF Date Analyzed
Client ID Lab ID Matrix Date Collected Instrument Batch ID Lead 480 0.69 5.0 10 05/31/2022 13:23
Surrogates REC (%) Limits
Analyst(s): WV
Terbium 106 70-130 05/31/2022 13:23
S-2-SE-1.75 2205F72-007A Soil 05/26/2022 07:01 ICP-MS4 280SMPL.d 246328 Analytes Result MDL RL DF Date Analyzed
Client ID Lab ID Matrix Date Collected Instrument Batch ID Lead 71 0.069 0.50 1 05/27/2022 21:30
Surrogates REC (%) Limits
Analyst(s): DB
Terbium 108 70-130 05/27/2022 21:30
S-2-NE-1 2205F72-008A Soil 05/26/2022 06:25 ICP-MS4 281SMPL.d 246328 Analytes Result MDL RL DF Date Analyzed
Client ID Lab ID Matrix Date Collected Instrument Batch ID Lead 54 0.069 0.50 1 05/27/2022 21:34
Surrogates REC (%) Limits
Analyst(s): DB
Terbium 87 70-130 05/27/2022 21:34
CA ELAP 1644 • NELAP 4033ORELAP
(Cont.)
Analytical Report
McCampbell Analytical, Inc. 1534 Willow Pass Road, Pittsburg, CA 94565-1701 Toll Free Telephone: (877) 252-9262 / Fax: (925) 252-9269 http://www.mccampbell.com / E-mail: [email protected] "When Quality Counts" Client: Environmental Science Associates
Project: D181242.01; Ukiah Riverside Park
Date Received: 05/26/2022 10:57
Date Prepared: 05/27/2022
WorkOrder: 2205F72
Extraction Method: SW3050B
Analytical Method: SW6020
Unit: mg/Kg
Lead
S-2-NE-2 2205F72-009A Soil 05/26/2022 06:35 ICP-MS4 282SMPL.d 246328 Analytes Result MDL RL DF Date Analyzed
Client ID Lab ID Matrix Date Collected Instrument Batch ID Lead 40 0.069 0.50 1 05/27/2022 21:38
Surrogates REC (%) Limits
Analyst(s): DB
Terbium 106 70-130 05/27/2022 21:38
CA ELAP 1644 • NELAP 4033ORELAP
Quality Control Report
McCampbell Analytical, Inc. 1534 Willow Pass Road, Pittsburg, CA 94565-1701 Toll Free Telephone: (877) 252-9262 / Fax: (925) 252-9269 http://www.mccampbell.com / E-mail: [email protected] "When Quality Counts" Client: Environmental Science Associates
Project: D181242.01; Ukiah Riverside Park
Date Analyzed: 06/01/2022
Date Prepared: 05/26/2022
WorkOrder: 2205F72
BatchID: 246327
Analytical Method: SW8081A
Unit: mg/kg
Sample ID: MB/LCS/LCSD-246327
2205F72-001AMS/MSD
Instrument: GC40
Matrix: Soil
Extraction Method: SW3550B
QC Summary Report for SW8081A
Analyte MB
Result
MDL RL SPK
Val
MB SS
%REC
MB SS
Limits
Aldrin ND 0.00039 0.0010 - - -
a-BHC ND 0.00049 0.0010 - - -
b-BHC ND 0.00027 0.0010 - - -
d-BHC ND 0.00033 0.0010 - - -
g-BHC ND 0.00033 0.0010 - - -
Chlordane (Technical) ND 0.012 0.025 - - -
a-Chlordane ND 0.00043 0.0010 - - -
g-Chlordane ND 0.00034 0.0010 - - -
p,p-DDD ND 0.00041 0.0010 - - -
p,p-DDE ND 0.00029 0.0010 - - -
p,p-DDT ND 0.00039 0.0010 - - -
Dieldrin ND 0.00038 0.0010 - - -
Endosulfan I ND 0.00035 0.0010 - - -
Endosulfan II ND 0.00033 0.0010 - - -
Endosulfan sulfate ND 0.00040 0.0010 - - -
Endrin ND 0.00038 0.0010 - - -
Endrin aldehyde ND 0.00044 0.0010 - - -
Endrin ketone ND 0.00029 0.0010 - - -
Heptachlor ND 0.00030 0.0010 - - -
Heptachlor epoxide ND 0.00030 0.0010 - - -
Hexachlorobenzene ND 0.00070 0.010 - - -
Hexachlorocyclopentadiene ND 0.00052 0.020 - - -
Methoxychlor ND 0.00045 0.0010 - - -
Toxaphene ND 0.033 0.050 - - -
Surrogate Recovery
Decachlorobiphenyl 0.051 0.05 102 70-130
CA ELAP 1644 • NELAP 4033ORELAP
(Cont.)
Quality Control Report
McCampbell Analytical, Inc. 1534 Willow Pass Road, Pittsburg, CA 94565-1701 Toll Free Telephone: (877) 252-9262 / Fax: (925) 252-9269 http://www.mccampbell.com / E-mail: [email protected] "When Quality Counts" Client: Environmental Science Associates
Project: D181242.01; Ukiah Riverside Park
Date Analyzed: 06/01/2022
Date Prepared: 05/26/2022
WorkOrder: 2205F72
BatchID: 246327
Analytical Method: SW8081A
Unit: mg/kg
Sample ID: MB/LCS/LCSD-246327
2205F72-001AMS/MSD
Instrument: GC40
Matrix: Soil
Extraction Method: SW3550B
QC Summary Report for SW8081A
Analyte LCS
Result
LCSD
Result
SPK
Val
LCS
%REC
LCSD
%REC
LCS/LCSD
Limits
RPD RPD
Limit
Aldrin 0.057 0.057 0.050 113 114 70-130 0.569 20
a-BHC 0.051 0.051 0.050 102 102 70-130 0.00926 20
b-BHC 0.049 0.049 0.050 98 99 70-130 0.383 20
d-BHC 0.060 0.061 0.050 121 121 70-130 0.150 20
g-BHC 0.055 0.055 0.050 110 110 70-130 0.0384 20
a-Chlordane 0.052 0.052 0.050 104 104 70-130 0.529 20
g-Chlordane 0.055 0.055 0.050 110 110 70-130 0.560 20
p,p-DDD 0.064 0.065 0.050 129 129 70-130 0.713 20
p,p-DDE 0.056 0.056 0.050 111 113 70-130 1.04 20
p,p-DDT 0.040 0.041 0.050 80 82 70-130 2.33 20
Dieldrin 0.052 0.052 0.050 104 104 70-130 0.643 20
Endosulfan I 0.055 0.055 0.050 109 110 70-130 0.640 20
Endosulfan II 0.056 0.056 0.050 111 112 70-130 0.867 20 Endosulfan sulfate 0.055 0.056 0.050 110 112 70-130 1.46 20 Endrin 0.055 0.055 0.050 109 110 70-130 0.700 20
Endrin aldehyde 0.052 0.053 0.050 105 106 70-130 1.18 20 Endrin ketone 0.051 0.052 0.050 102 104 70-130 1.51 20
Heptachlor 0.055 0.056 0.050 110 111 70-130 0.641 20
Heptachlor epoxide 0.052 0.052 0.050 104 104 70-130 0.535 20 Hexachlorobenzene 0.048 0.048 0.050 96 97 70-130 0.436 20 Hexachlorocyclopentadiene 0.033 0.034 0.050 66 69 50-130 3.89 20 Methoxychlor 0.039 0.040 0.050 78 80 70-130 2.40 20
Surrogate Recovery
Decachlorobiphenyl 0.051 0.051 0.050 102 103 70-130 1.05 20 Analyte MS
Result
MSD
Result
SPK
Val
SPKRef
Val
MS
%REC
MSD
%REC
MS/MSD
Limits
RPD RPD
Limit
MS
DF
Aldrin 1 0.056 0.056 0.050 ND 112 111 60-130 0.634 20
a-BHC 1 0.058 0.058 0.050 ND 116 115 60-130 0.835 20
b-BHC 1 0.046 0.046 0.050 ND 93 93 60-130 0.144 20
d-BHC 1 0.061 0.061 0.050 ND 122 121 60-130 0.0721 20
g-BHC 1 0.045 0.045 0.050 ND 91 91 60-130 0.263 20
a-Chlordane 1 0.051 0.051 0.050 ND 103 102 60-130 0.478 20 g-Chlordane 1 0.055 0.054 0.050 ND 110 108 60-130 1.49 20 p,p-DDD 1 0.061 0.060 0.050 ND 122 120 60-130 1.09 20
p,p-DDE 1 0.055 0.055 0.050 ND 110 110 60-130 0.116 20
CA ELAP 1644 • NELAP 4033ORELAP
(Cont.)
Quality Control Report
McCampbell Analytical, Inc. 1534 Willow Pass Road, Pittsburg, CA 94565-1701 Toll Free Telephone: (877) 252-9262 / Fax: (925) 252-9269 http://www.mccampbell.com / E-mail: [email protected] "When Quality Counts" Client: Environmental Science Associates
Project: D181242.01; Ukiah Riverside Park
Date Analyzed: 06/01/2022
Date Prepared: 05/26/2022
WorkOrder: 2205F72
BatchID: 246327
Analytical Method: SW8081A
Unit: mg/kg
Sample ID: MB/LCS/LCSD-246327
2205F72-001AMS/MSD
Instrument: GC40
Matrix: Soil
Extraction Method: SW3550B
QC Summary Report for SW8081A
Analyte MS
Result
MSD
Result
SPK
Val
SPKRef
Val
MS
%REC
MSD
%REC
MS/MSD
Limits
RPD RPD
Limit
MS
DF
p,p-DDT 1 0.057 0.057 0.050 ND 114 113 60-130 0.641 20
Dieldrin 1 0.053 0.053 0.050 ND 106 105 60-130 0.309 20 Endosulfan I 1 0.055 0.054 0.050 ND 109 109 60-130 0.437 20 Endosulfan II 1 0.057 0.057 0.050 ND 115 114 60-130 0.834 20 Endosulfan sulfate 1 0.058 0.057 0.050 ND 115 114 60-130 1.05 20 Endrin 1 0.061 0.061 0.050 ND 123 122 60-130 0.379 20
Endrin aldehyde 1 0.054 0.054 0.050 ND 109 108 60-130 0.539 20 Endrin ketone 1 0.056 0.055 0.050 ND 111 110 60-130 0.779 20 Heptachlor 1 0.056 0.056 0.050 ND 112 112 60-130 0.108 20 Heptachlor epoxide 1 0.052 0.052 0.050 ND 104 104 60-130 0.335 20 Hexachlorobenzene 1 0.048 0.048 0.050 ND 97 96 60-130 0.550 20 Hexachlorocyclopentadiene 1 0.045 0.046 0.050 ND 89 92 50-130 2.23 20 Methoxychlor 1 0.057 0.057 0.050 ND 114 114 60-130 0.102 20 Surrogate Recovery
Decachlorobiphenyl 1 0.055 0.055 0.050 110 109 60-130 1.28 20 CA ELAP 1644 • NELAP 4033ORELAP
Quality Control Report
McCampbell Analytical, Inc. 1534 Willow Pass Road, Pittsburg, CA 94565-1701 Toll Free Telephone: (877) 252-9262 / Fax: (925) 252-9269 http://www.mccampbell.com / E-mail: [email protected] "When Quality Counts" Client: Environmental Science Associates
Project: D181242.01; Ukiah Riverside Park
Date Analyzed: 05/27/2022
Date Prepared: 05/27/2022
WorkOrder: 2205F72
BatchID: 246328
Analytical Method: SW6020
Unit: mg/kg
Sample ID: MB/LCS/LCSD-246328
Instrument: ICP-MS4
Matrix: Soil
Extraction Method: SW3050B
QC Summary Report for Metals
Analyte MB
Result
MDL RL SPK
Val
MB SS
%REC
MB SS
Limits
Lead ND 0.069 0.50 - - -
Surrogate Recovery
Terbium 540 500 107 70-130
Analyte LCS
Result
LCSD
Result
SPK
Val
LCS
%REC
LCSD
%REC
LCS/LCSD
Limits
RPD RPD
Limit
Lead 49 48 50 98 97 75-125 1.36 20
Surrogate Recovery
Terbium 540 530 500 109 105 70-130 3.31 20
CA ELAP 1644 • NELAP 4033ORELAP
McCampbell Analytical, Inc.
1534 Willow Pass Rd
Pittsburg, CA 94565-1701
(925) 252-9262
CHAIN-OF-CUSTODY RECORD Page
Lab ID Matrix Collection Date Hold
Requested Tests (See legend below)
Report to:
Michael Burns
2600 Capitol Avenue, Suite 200
Sacramento, CA 95816
(650) 391-4880 FAX:
PO: D181242.01
05/26/2022
ClientSampID
Project: D181242.01; Ukiah Riverside Park
WorkOrder: 2205F72
1 of 1
Date Logged:
Date Received: 05/26/2022
1 2 3 4 5 6 7 8 9 10 11 12
Environmental Science Associates
Bill to:
Jeff Trow
Environmental Science Associates
2600 Capitol Avenue, Suite 200
Sacramento, CA 95816
Requested TAT: 5 days;
ClientCode: ESAS
Email: [email protected]
EDF EQuIS Email HardCopy ThirdParty
[email protected]
Excel
CLIP J-flag
cc/3rd Party:
WaterTrax
Detection Summary
Dry-Weight
2205F72-001 S-2-2 Soil 5/26/2022 06:14 A A A
2205F72-002 S-2-NW-1 Soil 5/26/2022 07:53 A A A
2205F72-003 S-2-NW-2.25 Soil 5/26/2022 08:02 A A A
2205F72-004 S-2-SW-1 Soil 5/26/2022 07:16 A A A
2205F72-005 S-2-SW-1.75 Soil 5/26/2022 07:27 A A A
2205F72-006 S-2-SE-1 Soil 5/26/2022 06:55 A A A
2205F72-007 S-2-SE-1.75 Soil 5/26/2022 07:01 A A A
2205F72-008 S-2-NE-1 Soil 5/26/2022 06:25 A A A
2205F72-009 S-2-NE-2 Soil 5/26/2022 06:35 A A A
Prepared by: Agustina Venegas
NOTE: Soil samples are discarded 60 days after receipt unless other arrangements are made (Water samples are 30 days).
Hazardous samples will be returned to client or disposed of at client expense.
Comments:
1 8081_S 2 PBMS_TTLC_S 3 PRDisposal Fee 4
5 6 7 8
9 10
Test Legend:
11 12
LabID ClientSampID Collection Date
& Time
Date Logged:
Matrix Test Name Containers TAT
/Composites
WORK ORDER SUMMARY
Work Order: 2205F72
Comments:
Client Name: ENVIRONMENTAL SCIENCE ASSOCIATES Project: D181242.01; Ukiah Riverside Park QC Level: LEVEL 2
Dry- Hold
Weight
Sub
Out
Bottle &
Preservative
5/26/2022
Sediment
Content
WriteOn EDF Excel EQuIS Email HardCopy ThirdParty J-flag Client Contact: Michael Burns
Contact's Email: [email protected]
WaterTrax
Head Test Due Date
Space
U**
McCampbell Analytical, Inc. 1534 Willow Pass Road, Pittsburg, CA 94565-1701 Toll Free Telephone: (877) 252-9262 / Fax: (925) 252-9269 http://www.mccampbell.com / E-mail: [email protected] "When Quality Counts" 001A S-2-2 Soil SW6020 (Lead) 1 16OZ GJ, Unpres 5/26/2022 6:14 5 days 6/3/2022 SW8081A (OC Pesticides) 5 days 6/3/2022
002A S-2-NW-1 Soil SW6020 (Lead) 1 16OZ GJ, Unpres 5/26/2022 7:53 5 days 6/3/2022 SW8081A (OC Pesticides) 5 days 6/3/2022
003A S-2-NW-2.25 Soil SW6020 (Lead) 1 16OZ GJ, Unpres 5/26/2022 8:02 5 days 6/3/2022 SW8081A (OC Pesticides) 5 days 6/3/2022
004A S-2-SW-1 Soil SW6020 (Lead) 1 16OZ GJ, Unpres 5/26/2022 7:16 5 days 6/3/2022 SW8081A (OC Pesticides) 5 days 6/3/2022
005A S-2-SW-1.75 Soil SW6020 (Lead) 1 16OZ GJ, Unpres 5/26/2022 7:27 5 days 6/3/2022 SW8081A (OC Pesticides) 5 days 6/3/2022
006A S-2-SE-1 Soil SW6020 (Lead) 1 16OZ GJ, Unpres 5/26/2022 6:55 5 days 6/3/2022 SW8081A (OC Pesticides) 5 days 6/3/2022
007A S-2-SE-1.75 Soil SW6020 (Lead) 1 16OZ GJ, Unpres 5/26/2022 7:01 5 days 6/3/2022 SW8081A (OC Pesticides) 5 days 6/3/2022
008A S-2-NE-1 Soil SW6020 (Lead) 1 16OZ GJ, Unpres 5/26/2022 6:25 5 days 6/3/2022
* STLC and TCLP extractions require 2 days to complete; therefore, all TATs begin after the extraction is completed (i.e., One-day TAT yields results in 3 days from sample submission).
NOTES:
- MAI assumes that all material present in the provided sampling container is considered part of the sample - MAI does not exclude any material from the sample prior to sample preparation unless requested in writing by the client.
U** = An unpreserved container was received for a method that suggests a preservation in order to extend hold time for analysis.
LabID ClientSampID Collection Date
& Time
Date Logged:
Matrix Test Name Containers TAT
/Composites
WORK ORDER SUMMARY
Work Order: 2205F72
Comments:
Client Name: ENVIRONMENTAL SCIENCE ASSOCIATES Project: D181242.01; Ukiah Riverside Park QC Level: LEVEL 2
Dry- Hold
Weight
Sub
Out
Bottle &
Preservative
5/26/2022
Sediment
Content
WriteOn EDF Excel EQuIS Email HardCopy ThirdParty J-flag Client Contact: Michael Burns
Contact's Email: [email protected]
WaterTrax
Head Test Due Date
Space
U**
McCampbell Analytical, Inc. 1534 Willow Pass Road, Pittsburg, CA 94565-1701 Toll Free Telephone: (877) 252-9262 / Fax: (925) 252-9269 http://www.mccampbell.com / E-mail: [email protected] "When Quality Counts" 008A S-2-NE-1 Soil SW8081A (OC Pesticides) 1 16OZ GJ, Unpres 5/26/2022 6:25 5 days 6/3/2022 009A S-2-NE-2 Soil SW6020 (Lead) 1 16OZ GJ, Unpres 5/26/2022 6:35 5 days 6/3/2022 SW8081A (OC Pesticides) 5 days 6/3/2022
* STLC and TCLP extractions require 2 days to complete; therefore, all TATs begin after the extraction is completed (i.e., One-day TAT yields results in 3 days from sample submission).
NOTES:
- MAI assumes that all material present in the provided sampling container is considered part of the sample - MAI does not exclude any material from the sample prior to sample preparation unless requested in writing by the client.
U** = An unpreserved container was received for a method that suggests a preservation in order to extend hold time for analysis.
Sample Receipt Checklist
McCampbell Analytical, Inc. 1534 Willow Pass Road, Pittsburg, CA 94565-1701 Toll Free Telephone: (877) 252-9262 / Fax: (925) 252-9269 http://www.mccampbell.com / E-mail: [email protected] "When Quality Counts" Client Name: Environmental Science Associates
WorkOrder №: 2205F72
Date Logged: 5/26/2022
Matrix: Soil Logged by: Agustina Venegas
Carrier: Client Drop-In
Shipping container/cooler in good condition? Yes No
Custody seals intact on shipping container/cooler? Yes No NA Samples Received on Ice? Yes No
Chain of custody present? Yes No
Chain of custody signed when relinquished and received? Yes No Chain of custody agrees with sample labels? Yes No
Samples in proper containers/bottles? Yes No
Sample containers intact? Yes No
Sufficient sample volume for indicated test? Yes No
All samples received within holding time? Yes No NA
Sample/Temp Blank temperature NA
ZHS conditional analyses: VOA meets zero headspace Yes No NA requirement (VOCs, TPHg/BTEX, RSK)?
pH acceptable upon receipt (Metal: <2; Nitrate 353.2/4500NO3:
<2; 522: <4; 218.7: >8)?
Yes No NA
Temp: 2.1°C
Chain of Custody (COC) Information
Sample IDs noted by Client on COC? Yes No
Date and Time of collection noted by Client on COC? Yes No Sampler's name noted on COC? Yes No
Sample Receipt Information
Sample Preservation and Hold Time (HT) Information
Sample labels checked for correct preservation? Yes No
Project: D181242.01; Ukiah Riverside Park
(Ice Type: WET ICE )
Comments:
pH tested and acceptable upon receipt (200.7: ≤2; 533: 6 - 8; 537.1: 6 - 8)?
Yes No NA
UCMR Samples:
Free Chlorine tested and acceptable upon receipt (<0.1mg/L) [not applicable to 200.7]?
Yes No NA
Date and Time Received: 5/26/2022 10:57
Received by: Agustina Venegas
COC agrees with Quote? Yes No NA
Custody seals intact on sample bottles? Yes No NA
PREPARED BY OR UNDER THE SUPERVISION OF: GREG MELTON RLA No. 4217 1281 E. GOBBI STREET RIVERSIDE PARK REGENERATION PROJECT PLANS FOR THE CONSTRUCTION OF: SHEET TITLE DATE MELTON DESIGN GROUP L0.0 L0.1 L0.2 L0.3 L1.0 L1.1 L1.2 L1.3 L1.4 TITLE SHEET PROJECT CHECKLIST EROSION CONTROL PLAN EROSION CONTROL DETAILS EXISTING CONDITIONS, SITE ACCESS, AND DEMOLITION GRADING PLAN GRADING SECTIONS GRADING SECTIONS GRADING SECTIONS CONSTRUCTION PLAN AND DETAILS PLANTING PLAN PLANTING DETAILS IRRIGATION PLAN IRRIGATION DETAILS CONSTRUCTION UNDER THIS CONTRACT SHALL COMPLY WITH THE LATEST CALIFORNIA BUILDING CODE (CBC), CALIFORNIA MECHANICAL CODE (CMC), CALIFORNIA PLUMBING CODE (CPC), CALIFORNIA ELECTRICAL CODE (CEC), AND THE 2016 CALIFORNIA ENERGY STANDARDS AS AMENDED BY THE STATE OF CALIFORNIA AND THE LOCAL JURISDICTION. GENERAL CONSTRUCTION NOTE: ACCEPTED BY: DATE PROJECT SITE 300 SEMINARY AVENUE UKIAH, CA 95482 CITY OF UKIAH CHICO 820 BROADWAY ST. CHICO, CA 95928 (530) 899-1616 PROJECT SITE UKIAH PREPARED FOR: PREPARED BY: UKIAH, CA 95482 E. GOBBI STREET KEY MAP OF MENDOCINO COUNTY SACRAMENTO 1930 G STREET SACRAMENTO, CA 95811 (916) 754-2153 CITY REPRESENTATIVE NAME REPRESENTATIVE TITLE SCALE: NTS NORTH RUSSIAN RIVER PLAN LAYOUT POINTS TO BE PROVIDED TO CONTRACTOR FOR USE BY CONTRACTOR TO STAKE OUT SITE ELEMENTS NOTE TO CONTRACTOR: © MELTON DESIGN GROUP INC COPYRIGHT 2021 SHEET NUMBER MELTON DESIGN GROUP: PROJECT NUMBERS NO. DESCRIPTION DATE DATES SHEET TITLE PROJECT CONSULTANT CLIENT LICENSE 8. 1. 3. 2. 7. 4. 6. 5. 820 BROADWAY ST. CHICO, CA 95928 (530) 899-1616 meltondg.com SHEET ___ OF ___ CITY OF UKIAH RIVERSIDE PARK REGENERATION 2369 30% CD's 03-29-2022 PLOT DATE: May 8, 2024 - 2:50 PM FILE NAME: G:\MDG(2300-2399)\2369 Riverside Park Regeneration - Ukiah\2369 CAD\2369 CDs\SHEETS\2369-L0.0-TITL.dwg 90% CD's 08-18-2023 100% CD's 04-19-2024 -- -- -- -- -- -- -- -- -- -- 14 TITLE SHEET L0.0 1 SCALE: NTS NORTH BABCOCK LANE OAK MANOR DR CONSTRUCTION ACCESS LAYDOWN AREA SHEET INDEX L-2.0 L-3.0 L-3.1 L-4.0 L-4.1 SPECIFICATION #24-05 PROJECT #24-05
© MELTON DESIGN GROUP INC COPYRIGHT 2021 SHEET NUMBER MELTON DESIGN GROUP: PROJECT NUMBERS NO. DESCRIPTION DATE DATES SHEET TITLE PROJECT CONSULTANT CLIENT LICENSE 8. 1. 3. 2. 7. 4. 6. 5. 820 BROADWAY ST. CHICO, CA 95928 (530) 899-1616 meltondg.com SHEET ___ OF ___ CITY OF UKIAH RIVERSIDE PARK REGENERATION 2369 30% CD's 03-29-2022 PLOT DATE: May 8, 2024 - 2:50 PM FILE NAME: G:\MDG(2300-2399)\2369 Riverside Park Regeneration - Ukiah\2369 CAD\2369 CDs\SHEETS\2369-L0.0-TITL.dwg 90% CD's 08-18-2023 100% CD's 04-19-2024 -- -- -- -- -- -- -- -- -- -- 14 TITLE SHEET L0.1 2 LANDSCAPE DOCUMENTATION PROJECT CONSTRUCTION APPROVAL CHECKLIST PACKAGE (LDP) CHECKLIST (DESIGN) CHECK BOX CHECK BOX DATE: CONTACT INFORMATION FOR THE APPLICANT AND PROPERTY OWNER: CHECKLIST OF ALL DOCUMENTS IN THE LDP WATER SUPPLY TYPE AND NAME OF LOCAL WATER PURVEYOR: CONTACT SITE OWNER-CITY OF UKIAH DEPT. OF COMMUNITY SERVICES PROJECT TYPE (CONSTRUCTION OF SEASONAL WETLANDS) TOTAL LANDSCAPE AREA (IN SQUARE FEET): 272,400 SF APPLICANT (CONTRACTOR): PROPERTY OWNER: CITY OF UKIAH 300 SEMINARY AVENUE UKIAH, CA 95482 PROJECT APPLICANT: (CONTRACTOR) "I AGREE TO COMPLY WITH THE REQUIREMENTS OF THE WATER EFFICIENT LANDSCAPE ORDINANCE AND SUBMIT A COMPLETE LANDSCAPE DOCUMENTATION PACKAGE." APPLICANT SIGNATURE (CONTRACTOR) WATER EFFICIENT LANDSCAPE WORKSHEET INCLUDING: 1) HYDROZONE INFORMATION TABLE 2) WATER BUDGET CALCULATIONS INCLUDING: a. MAX APPLIED WATER ALLOWANCE (MAWA) INCLUDING WATER FEATURES b. ESTIMATED TOTAL WATER USE (ETWU) SOILS MANAGEMENT REPORT: TO BE PROVIDED BY CONTRACTOR LANDSCAPE DESIGN PLAN: SHEET L-3.0 - L3.1 IRRIGATION DESIGN PLAN: SHEET L-4.0 - L4.1 GRADING DESIGN PLAN: L1.1 - L1.4 CONSTRUCTION DESIGN PLAN: SHEET L-2.0 TREE PROTECTION NOTES DESCRIPTION OWNER REP. INITIALS GC INITIALS DESCRIPTION PRE-CONSTRUCTION MEETING WITH PROJECT SCHEDULE MATERIAL SUBMITTAL PACKAGE (DIGITAL COPY INITIAL- UPON APPROVAL, PROVIDE APPROVED HARD COPIES : 2 COPIES TO CLIENT, 1 COPY TO CLIENT IF APPLICABLE) AFTER MASS GRADING THE CONTRACTOR SHALL OBTAIN A SOILS REPORT. SUBMIT TO CLIENT REPRESENTATIVE. MAINLINE PRESSURE TEST & TRENCH OBSERVATION. CONTRACTOR TO CONTACT OWNER'S REPRESENTATIVE FOR OBSERVATION PRIOR TO BACK FILL. FERTILIZER/ AMENDMENT TAGS. CONTRACTOR IS TO SUBMIT TAGS OF FERTILIZER(S) AND AMENDMENTS TO OWNER'S REPRESENTATIVE FOR VERIFICATION ON QUANTITIES. IRRIGATION OPERATION, COVERAGE TEST, LOCATION AND ELEVATION OF ALL MAINLINE TRACKING TAPE, AND IRRIGATION AUDIT (PRIOR TO PLANTING AND INSTALLATION OF MULCH OR SURFACE MATERIAL FOR DRIP SYSTEMS. FOR SPRAY SYSTEMS: AUDIT TO OCCUR PRIOR TO PLANTING.) FINAL APPROVAL OF IRRIGATION INITIAL ENTRY INTO MAINTENANCE PERIOD. CONTRACTOR TO CONTACT OWNER'S REPRESENTATIVE FOR OBSERVATION. PUNCHLIST FOLLOWUP OBSERVATION FOR ENTRY INTO MAINTENANCE PERIOD. CONTRACTOR TO CONTACT OWNER'S REPRESENTATIVE FOR VERIFICATION OF PUNCHLIST ITEMS MAINTENANCE PERIOD PER SPECIFICATIONS START DATE:__________________________ PROJECTED FINISH DATE:___________________________ AS-BUILTS (HARD COPY AND DIGITAL). CONTRACTOR TO SUBMIT TO OWNER'S REPRESENTATIVE AND COORDINATE WITH LANDSCAPE ARCHITECT FOR AS-BUILT APPROVAL. CLOSEOUT SUBMITTALS PER SPECIFICATIONS. FINAL OBSERVATION. CONTRACTOR TO CONTACT OWNER'S REPRESENTATIVE FOR OBSERVATION. CERTIFICATIONS OF COMPLETION. CONTRACTOR IS RESPONSIBLE TO SUBMIT COMPLETED CERTIFICATES OF COMPLETION FROM PROJECT APPLICANT AND LANDSCAPE ARCHITECT TO OWNER. NOTIFICATION OF MAINTENANCE PERIOD ENDING TO OWNER. NOTE: · THIS LIST OF REQUIRED SUBMITTALS AND INSPECTIONS IS FOR REFERENCE PURPOSES ONLY. SEE BOOK FORM SPECIFICATIONS AND DETAILS FOR COMPLETE SUBMITTAL AND INSPECTION REQUIREMENTS. · PLEASE PROVIDE A MINIMUM OF 2 WORKING DAYS NOTICE FOR ALL OBSERVATIONS. · IT IS THE CONTRACTOR'S RESPONSIBILITY TO ENSURE ALL SUBMITTALS AND INSPECTIONS ARE COMPLETED AS SPECIFIED IN THE CONTRACT DOCUMENTS. · CONTRACTOR TO CONTACT OWNER'S REPRESENTATIVE FOR OBSERVATION. THE PROJECT LANDSCAPE CONTRACTOR IS RESPONSIBLE FOR OBTAINING SOILS ANALYSIS OF SITE SOIL FROM AN ANALYTICAL LABORATORY AND AMENDING THE SOIL AS PER THE RECOMMENDATIONS FOR LANDSCAPES STATED IN RATES OF COMMONLY AVAILABLE AMENDMENTS (CUBIC YARDS OR WEIGHT PER 1,000 SF). RECOMMENDATIONS PENDING LABORATORY ANALYSIS. SOIL REPORT NOTE 1. PRIOR TO ANY GROUND DISTURBING ACTIVITIES, INCLUDING CLEARING AND GRUBBING, SCRAPING, OR GRADING, THE SUPERVISING CONTRACTOR SHALL ARRANGE A PRE-CONSTRUCTION (PRE-GROUND DISTURBANCE) SITE MEETING WITH THE LANDSCAPE ARCHITECT, CITY OF UKIAH, AND THE SUPERVISING CONTRACTOR. THE PURPOSE OF THE PRE-CONSTRUCTION SITE MEETING IS TO VERIFY THAT TREE PROTECTION FENCING IS IN PLACE AND TO INSURE THAT ALL PARTIES ARE FAMILIAR WITH THE NATURE OF THE WORK INVOLVED. 2. PRIOR TO ANY GROUND DISTURBING ACTIVITIES, AND PRIOR TO THE SUPERVISING CONTRACTOR'S MAKING THE ARRANGEMENTS FOR THE PRE-CONSTRUCTION SITE MEETING, A TEMPORARY CONSTRUCTION FENCE SHALL BE INSTALLED AS INDICATED ON PLANS. THE FENCE SHALL BE 4' MINIMUM HEIGHT, ORANGE POLYETHYLENE FENCING AS MANUFACTURED BY GEOTENAX CORP. (800-356-8495), OR EQUAL. INSTALL WITH METAL 'T' STAKES (TO EXTEND TO 4 FOOT MINIMUM HEIGHT ABOVE FINISH GRADE). FENCING SHALL BE SUBSTANTIAL ENOUGH TO RESTRICT ACTIVITY TO OUTSIDE THE AREA AND SHALL BE INSTALLED PRIOR TO ANY GRADING OR OTHER CONSTRUCTION ACTIVITY. DURING CONSTRUCTION, MAINTENANCE SHALL BE PERFORMED SO THAT THE FENCE REMAINS IN GOOD REPAIR. REMOVAL OF THE FENCE SHALL ONLY OCCUR TO ALLOW REQUIRED CONSTRUCTION WITHIN THE AREA OR TO COMPLETE SITE LANDSCAPING. MINIMIZE DAMAGE TO TREE LIMBS, CROWN, CANOPY, AND TRUNK OF TREES TO REMAIN. 3. THE CONTRACTOR SHALL BE RESPONSIBLE TO PROTECT THE TREE FROM EXCESS FILL AND/OR THE REMOVAL OF EXCESS SOIL FROM THE TREE ROOT ZONE. THE TREE ROOT ZONE IS A PROJECTED RADIUS ON THE GROUND FORMED BY THE OUTERMOST EDGE OF THE TREE CANOPY. 4. THE CONTRACTOR SHALL BE RESPONSIBLE TO MINIMIZE COMPACTION OF THE SOIL WITHIN THE TREE ROOT ZONES OF ALL TREES TO REMAIN. 5. WHEN EXISTING TREE ROOTS ARE ENCOUNTERED DURING THE COURSE OF TRENCHING, THE CONTRACTOR SHALL PREVENT THE TREE ROOTS FROM DESICCATION (DRYING OUT), BY APPLICATION OF A SEALING AGENT AND BY MINIMIZING THE AMOUNT OF TIME THAT TREE ROOTS ARE EXPOSED. TREE ROOTS SHALL ONLY BE EXPOSED WHEN TEMPERATURES ARE ANTICIPATED TO BE ABOVE FORTY DEGREES FAHRENHEIT AND BELOW 90 DEGREES FAHRENHEIT AND SHALL NOT REMAIN EXPOSED LONGER THAN 12 HOURS. IN THE EVENT THAT TRENCHES WITHIN TREE ROOT ZONES CANNOT BE BACKFILLED WITHIN 12 HOURS, THE CONTRACTOR SHALL COVER EXPOSED ROOTS WITH BURLAP AND MAINTAIN MOISTURE BY APPLICATION OF WATER TO MOISTEN BURLAP UNTIL TRENCHES CAN BE BACKFILLED. 6. UNDERGROUND FACILITIES AND TRENCHES, (e.g., UTILITY SERVICES, SANITARY SEWER, OR STORM DRAINAGE LINES) SHALL BE CONSOLIDATED, TO THE EXTENT FEASIBLE, AND LOCATED TO MINIMIZE IMPACTS UPON TREE ROOT SYSTEMS. ANY TRENCHING OR UNDERGROUND WORK SHOULD BE LOCATED OUTSIDE OF THE TREE DRIPLINE TO THE FULLEST EXTENT FEASIBLE. ANY TRENCHING REQUIRED WITHIN THE TREE DRIPLINE SHALL BE AS FAR FROM THE TREE TRUNK AS POSSIBLE AND SHALL BE EXCAVATED BY HAND OR 'AIR SPADE' OR PNEUMATIC EXCAVATOR TO MINIMIZE IMPACT ON ROOTS. 7. ROOTS 3/4 IN. OR GREATER IN SIZE ENCOUNTERED DURING TRENCHING SHALL BE CLEANLY HAND PRUNED AND TREATED WITH A SEALING AGENT TO REDUCE LOSS OF MOISTURE TO THE TREE. ROOTS GREATER THAN 1-1/2 IN. SHALL BE PRESERVED AND PROTECTED. CARE SHALL BE TAKEN TO MINIMIZE ABRASIONS TO ROOT BARK. 8. CONSTRUCTION VEHICLES, EQUIPMENT, OR MATERIALS (INCLUDING, BUT NOT LIMITED TO JOB SHACKS, PORTABLE TOILETS, AND CLEANOUT FACILITIES) SHALL NOT BE PARKED OR STORED WITHIN THE FENCED AREA. NO STAGING OR STORAGE AREA FOR CONSTRUCTION SHALL BE LOCATED CLOSER THAN 20 FEET TO THE DRIPLINE OF ANY TREE TO BE PROTECTED. 9. ALL CONSTRUCTION WASTES, INCLUDING BUT NOT LIMITED TO BUILDING MATERIAL DEBRIS, ROOFING MATERIALS, CLEANING OF CEMENT TRUCKS, CHEMICALS/ADHESIVES/SOLVENTS, ETC., SHALL BE STORED OR DISPOSED OF NO CLOSER THAN 20 FEET FROM ANY TREE DRIPLINE. 10. EXISTING TREES TO BE RETAINED AND PROTECTED AS INDICATED ON THE DEMOLITION AND/ OR CONSTRUCTION PLANS. DATE ROUGH GRADING INSPECTION DEROCKING 12" DEEP, REMOVING ALL ROCKS, ROOTS, AND FOREIGN MATERIAL LARGER THAN 1" 12" RIPPING SOIL AMENDMENTS AND TILL INTO TOP 6" - VERIFY AMENDMENT QUANTITIES AND SOIL AMENDMENTS WORKED INTO 6" PRIOR TO FINAL GRADING FINAL GRADE INSPECTION AND ACCEPTANCE PROJECT ADDRESS: 1281 E GOBBI ST, UKIAH, CA 95482 MENDOCINO COUNTY APN: 1800101000 1 YEAR ACCEPTANCE OF PLANT WARRANTY PERIOD. DATE TO BE 1 YEAR AFTER APPROVAL OF 90-DAY MAINTENANCE PERIOD:____
586.5 586.00 LP 586.00 LP 586.00 LP 586.00 LP 586.00 LP 594.10 HP 594.10 HP 591.05 HP 594.10 HP 592.15 HP (589.40) PATH (588.60) PATH (588.50) PATH (588.80) PATH (588.90) PATH (588.00) PATH 586.50 ELEV 586.44 ELEV 586.92 FL 588.01 OUTFALL (588.57) PATH (587.72) PATH (590.00) PATH (590.81) PATH (591.51) PATH (591.96) PATH 586.76 FL 586.45 FL 586.81 FL 586.80 FL 586.89 FL 580585 578 579581 582 583 584586587 580585578 579581 582 583 584 586 587 588
588
590 590
587588
589
591 591 592 592 593 593 594 594 590589 591 592 593 594 591 592 593 594 594 590 589 588 591 587 588 587
588 589
586 592
592 589.80 LP 587
589
587 590591 (589.49) PATH (586.84) PATH 588 590 590 588 588 586584 582 588 588.22 588.26
589
2%
2%
586.25 586.25
586.25
586.25
587 LIMIT OF WORK LIMIT OF WORK SILT FENCE SILT FENCE SF SF SF SF SF SF SF SF FR FR FR FR
FR
FR
FR
FR FR FR
FR
FR FR FR FR
FR
FR
FR
FR
FR
FR
FR FR FR FR FR
FR
FR
FR
SF
SF
SF SF SF SF SF SF SF SF
SF
SF
SF
SF
SF
SF SF
SF
SF
SF
SF
SF
SF
SF SF SF
SF SF SF
SF
SF SF SF SF SF
SF SF SF SF SF SF SF SF SF SF SF SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF SF SF SF SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
FR FR
FR
FR
FR
FR
FR
FR
FR FR
FR
FR
FR
FR
FR
FR
FR
FR FR FR FR FR FR FR FR
FR
FR
FR
FR FRFR
FR FR FR FR FR FR FR
FR
FR
FR
FR
FR
FR FR FR FR FR FR FR FR FR FR FR FR
FR
FR
FR
FR
FR
FR
FR
FR
FR
FR FR FR FR FR FR FR CONSTRUCTION ACCESS LIMIT OF WORK FR FR FR FR FR
FR FR FR FR FR FR FR
FR
FR
FR
FR
FR FR FR FR FR FR FR FR FR FR
FR
FR
FR FR
FR
FR
FR FR FR
FR LIMIT OF GRADING LIMIT OF GRADING LIMIT OF GRADING LIMIT OF GRADING LIMIT OF GRADING NORTH EROSION CONTROL PLAN L0.2 EXISTING CONDITIONS NOTE 1. CONTRACTOR SHALL BE RESPONSIBLE TO PROTECT AND RETAIN EXISTING GRAVEL PATHS, HARDSCAPE, ASPHALT PATHS, LANDSCAPING, IRRIGATION, ETC. THAT ARE NOT DESIGNATED FOR DEMOLITION OR MODIFICATION. 2. CONTRACTOR SHALL COVER EXISTING ASPHALT PATHS, ROADWAYS, CURBS, MOW CURBS AND OTHER ELEMENTS TO PROTECT FROM DAMAGE DURING CONSTRUCTION. 3. CONTRACTOR SHALL BE RESPONSIBLE TO REPAIR AND/OR REPLACE ALL DAMAGED SURFACES, AMENITIES, HARDSCAPES, LANDSCAPE, IRRIGATION, ETC. DUE TO HIS/HER ACTIVITY OR NEGLECT AND AS APPROVED BY THE CITY. 8 SYMBOL LEGEND SYMBOL DESCRIPTION 1. ALL EROSION CONTROL MEASURES SHALL CONFORM TO CITY OF UKIAH STANDARDS AND THE EROSION CONTROL PLANS SHOWN ON THE CONSTRUCTION DRAWINGS. 2. EROSION CONTROL DEVICES TO BE IN PLACE BEFORE START OF CONSTRUCTION 3. CONTRACTOR SHALL PLACE STABILIZED CONSTRUCTION SITE ACCESS PER DETAILS AND SPECIFICATIONS. 4. CONTRACTOR STORM WATER POLLUTION PLAN SHALL BE AVAILABLE ON SITE AT ALL TIMES. 5. CONTRACTOR SHALL ASSUME SOLE RESPONSIBILITY FOR STATE WATER RESOURCES CONTROL BOARD PERMIT COMPLIANCE. 6. SWPPP TO BE PREPARED PRIOR TO START OF CONSTRUCTION. 7. CONTRACTOR SHALL PROVIDE FIBER ROLL AT BACK OF CURB OR BANK AND IN AREAS REQUIRED BY THIS EROSION CONTROL PLAN. 7.1. INSPECTION BY CONTRACTOR SHALL BE FREQUENT. REPAIRS AND/OR REPLACEMENT SHALL BE MADE PROMPTLY; AS REQUIRED. 7.2. ACCUMULATED SILT SHALL BE REMOVED WHEN IT REACHES A DEPTH OF NINE INCHES. 8. CONTRACTOR SHALL MAINTAIN ALL FIBER ROLLS AND OTHER EROSION CONTROL DEVICES THROUGHOUT CONSTRUCTION. SILT BUILDUP IN SILTING BASIN AREA SHALL BE REMOVED AS NECESSARY. REMOVE ALL STORM WATER POLLUTION PREVENTION DEVICES AT THE END OF CONSTRUCTION. 9. INTERIM EROSION CONTROL MEASURES MAY BE NEEDED AND SHALL BE INSTALLED DURING CONSTRUCTION TO ASSURE ADEQUATE EROSION CONTROL FACILITIES ARE IN PLACE AT ALL TIMES. 10. CONTRACTOR SHALL USE DUST CONTROL MEASURES IN THE FORM OF WATER APPLICATION TO ALL EXPOSED SOIL SURFACES TO PREVENT THE TRANSPORT OF SOIL FROM EXPOSED SURFACES ON CONSTRUCTION SITES IN THE FORM OF AIRBORNE PARTICULATES. WATERING OF EXPOSED SOIL SURFACES SHALL OCCUR AT LEAST TWICE DAILY, PREFERABLY IN THE LATE MORNING AND AFTER WORK IS DONE FOR THE DAY. ALL CLEARING, GRADING, EARTH MOVING OR EXCAVATION ACTIVITIES SHALL CEASE WHEN WINDS EXCEED 15 MPH AVERAGED OVER 1 HOUR. 11. ANY SOIL MATERIAL CARRIED ONTO STREET SURFACES BY CONSTRUCTION EQUIPMENT SHALL BE REMOVED ON A DAILY BASIS. (BROOM OR VACUUM CLEAN- DO NOT USE WATER TO WASH THE STREET). 12. HAUL TRUCKS SHALL BE COVERED WITH TARPAULINS OR OTHER EFFECTIVE COVERS AT ALL TIMES. 13. PRIOR TO PLACEMENT OF LANDSCAPING, REMOVE TEMPORARY EROSION CONTROL MEASURES. 14. SOIL STOCKPILES NOT USED WITHIN THE LAST 14 DAYS MUST BE COVERED WITH AN EROSION CONTROL BLANKET OR PLASTIC SHEETING AND CONTAINED WITH A FIBER ROLL OR GRAVEL BAG BERM. 15. MAINTAIN ALL EROSION CONTROL MEASURES THROUGHOUT ENTIRETY OF PROJECT DURATION. 16. ENSURE THAT DUST CONTROL MEASURES DEPOSIT NO DUST TO ADJACENT PROPERTY BY NECESSARY MEASURES INCLUDING WATER APPLICATION, DUST CONTROL BARRIERS AND FENCING, AND COVERING DUST PRODUCING AREAS AND ACTIVITIES. STORAGE OF SOIL AND AND OTHER PARTICULATE MATERIAL MUST BE MAINTAINED AND REPLACED IF NECESSARY TO ENSURE ADJACENT PROPERTY RECEIVES NO DUST OR POWDER DEPOSIT FROM CONSTRUCTION MATERIALS AND EXECUTION. EROSION CONTROL GENERAL NOTES 1. CONSTRUCTION ENTRY, TRACK OUT, AND CONCRETE WASHOUT AREA LOCATIONS TO BE LOCATED AT NORTHWEST CORNER OF SITE. 2. SEE DETAIL 3/L1.1 FOR CONSTRUCTION SITE ACCESS DETAIL. 3. SEE DETAIL 4/L1.1 FOR CONCRETE WASHOUT DETAIL. CONSTRUCTION ACCESS NOTE JURISDICTIONAL WETLANDS NOTE 1. RETAIN AND PROTECT JURISDICTIONAL WETLAND. STAKE LIMITS FOR REVIEW AND APPROVAL BY OWNER'S REPRESENTATIVE PRIOR TO CONSTRUCTION. MAINTAIN MINIMUM 10' SETBACK WITH SILT FENCE AND FIBER ROLL. 2. SILT FENCE AND FIBER ROLL TO BE MAINTAINED THROUGHOUT DURATION OF PROJECT. LIMIT OF WORK LIMIT OF GRADING FIBER ROLL SILT FENCE PER WETLANDS NOTE CONSTRUCTION ACCESS JURISDICTIONAL WETLAND ADJACENT PROPERTY FENCE EXISTING PATH SEE DETAIL 1/L-1.6 SEE DETAIL 2/L-1.6 SEE DETAIL 3/L-1.6 SEE WETLANDS NOTE RETAIN AND PROTECT. REPAIR ANY DAMAGE THAT OCCURS. DESCRIPTION © MELTON DESIGN GROUP INC COPYRIGHT 2021 SHEET NUMBER MELTON DESIGN GROUP: PROJECT NUMBERS NO. DESCRIPTION DATE DATES SHEET TITLE PROJECT CONSULTANT CLIENT LICENSE 8. 1. 3. 2. 7. 4. 6. 5. 820 BROADWAY ST. CHICO, CA 95928 (530) 899-1616 meltondg.com SHEET ___ OF ___ CITY OF UKIAH RIVERSIDE PARK REGENERATION 2369 30% CD's 03-29-2022 PLOT DATE: May 8, 2024 - 2:50 PM FILE NAME: G:\MDG(2300-2399)\2369 Riverside Park Regeneration - Ukiah\2369 CAD\2369 CDs\SHEETS\2369-L0.2-EROS-PLAN.dwg 90% CD's 08-18-2023 100% CD's 04-19-2024 -- -- -- -- -- -- -- -- -- -- 14 0 40 80 SCALE: 1" = 40' SF FR
EROSION CONTROL DETAILS L0.3 9 © MELTON DESIGN GROUP INC COPYRIGHT 2021 SHEET NUMBER MELTON DESIGN GROUP: PROJECT NUMBERS NO. DESCRIPTION DATE DATES SHEET TITLE PROJECT CONSULTANT CLIENT LICENSE 8. 1. 3. 2. 7. 4. 6. 5. 820 BROADWAY ST. CHICO, CA 95928 (530) 899-1616 meltondg.com SHEET ___ OF ___ CITY OF UKIAH RIVERSIDE PARK REGENERATION 2369 30% CD's 03-29-2022 PLOT DATE: May 8, 2024 - 2:50 PM FILE NAME: G:\MDG(2300-2399)\2369 Riverside Park Regeneration - Ukiah\2369 CAD\2369 CDs\SHEETS\2369-L0.2-EROS-PLAN.dwg 90% CD's 08-18-2023 100% CD's 04-19-2024 -- -- -- -- -- -- -- -- -- -- 14 FIBER ROLL LAYOUT N.T.S. 1'-0" 3" 8" DIA. FIBER ROLL SLOPE SLOPE 1" X 2" X 24" WOOD STAKE AT 4' O.C. MAX. FIBER ROLL MIN. MIN. 2" 1L1.6 SILT FENCE N.T.S. 2'-0" 2'-6" 5'-0" 6'-0" MAX. 1'-6" 1'-0" 2'-0" 6" 2"x4" WOOD POST. STANDARD OR BETTER OR EQUAL ALTERNATE: STEEL FENCE POST. FILTER FABRIC MATERIAL 60" WIDE ROLLS. USE STAPLES OR WIRE RINGS TO ATTACH FABRIC TO WIRE. SILT BASIN BURY BOTTOM OF FILTER MATERIAL IN 8" X 12" TRENCH (SEE BELOW) FILTER FABRIC MATERIAL SILT BASIN 2"x4" WOOD POST. STANDARD OR BETTER OR EQUAL ALTERNATE: STEEL FENCE POST. FOLD AND SET FILTER FABRIC INTO SOIL BACKFILL AND COMPACT EXCAVATED SOIL IN TRENCH AND ON BOTH SIDES OF FILTER FENCE POSTS BACKFILL (SEE BELOW) 2L1.6 TEMPORARY CONSTRUCTION SITE ACCESS N.T.S. NOTES: 1. STABILIZED CONSTRUCTION SITE ACCESS SHALL BE CONSTRUCTED OF 1-1/2" MAXIMUM AGGREGATE BASE MATERIAL CONFORMING TO SECTION 26 OF STATE SPECIFICATIONS. MATERIAL SHALL BE PLACED TO A MINIMUM THICKNESS OF SIX INCHES. THE METHOD OF PLACING, SPREADING AND COMPACTING AGGREGATE BASE MATERIAL SHALL CONFORM TO SECTION 26 OF THE STATE SPECIFICATIONS. 2. LENGTH OF SITE ACCESS SHALL BE A MINIMUM LENGTH OF FIFTY FEET. WIDTH SHALL BE A MINIMUM OF TWENTY FEET, OR GREATER AS NECESSARY TO COVER ALL VEHICULAR INGRESS AND EGRESS. 3. THE SITE ACCESS SHALL BE KEPT IN GOOD CONDITION BY OCCASIONAL TOP DRESSING WITH AGGREGATE BASE MATERIAL OR CLEANED AS DIRECTED BY THE PROJECT SUPERVISOR. 4. TRUCK TIRES SHALL BE WASHED DOWN AND THE SEDIMENT CONTAINED ON THE PROJECT SITE. AA TURN DOWN FABRIC 12", ANCHOR W/ WIRE STAPLES 18" o.c., 12' MIN. WIDTH, TYP. AT BEGIN AND END PLAN VIEW SECTION A-A
RIGHT OF WAY RIGHT OF WAY CONSTRUCTION SITE DIRECTION OF TRAVEL 12' MINIMUM 6" PLACE "D" BALLAST OR 1-1/2" MAX. AGGREGATE BASE MATERIAL. CONSTRUCTION SITE 50' MINIMUM OR AS APPROVED BY THE DIRECTOR OF PUBLIC WORKS EXISTING GROUND STABILIZED ACCESS GEOTEXTILE FABRIC 3L1.6
X-102 X-102 X-102 X-102 X-103 D-101 X-107 X-106 X-106 EROSION CONTROL AND PROJECT LIMITS 10' FROM ADJACENT PROPERTY FENCE; SEE EROSION CONTROL PLAN X-108 D-101 X-103 LIMIT OF WORK LIMIT OF WORK X-104 D-102 X-104 X-105 D-102 X-101 LIMIT OF WORK D-103 X-109 X-109 X-109 X-109 X-109 X-109 X-109 X-109 LIMIT OF GRADING LIMIT OF GRADING LIMIT OF GRADING LIMIT OF GRADING LIMIT OF GRADING X-110 X-110 X-110 X-110 X-110 PROTECT ALL (E) TREES (TYP) DEMOLITION SYMBOL DESCRIPTION REMOVE DEBRIS PILES OF CONCRETE, ASPHALT, AND PLANT MATERIAL, REMOVE SAME DEBRIS 12" BELOW FINISH GRADE AND DISPOSE OF OFF-SITE, AND GRADE PER GRADING PLAN. SOME DEBRIS MAY EXIST ABOVE GRADE AND BELOW GRADE. REMOVE EXISTING FENCE AND DISPOSE OF OFF-SITE REMOVE EXISTING TREE, GRIND ALL ROOTS TO A DEPTH OF 36" AND REMOVE ALL GRINDINGS / ORGANIC MATTER AND COMPACT WITH TOPSOIL TO A 90% DENSITY. DISPOSE OF ALL ORGANIC MATTER OFF-SITE. EXISTING CONDITIONS SYMBOL DESCRIPTION STAGING AND LAYDOWN AREA. COORDINATE ACCESS WITH OWNER. RETAIN AND PROTECT GRAVEL TRAIL SURFACE. RETAIN AND PROTECT JURISDICTIONAL WETLAND. STAKE LIMITS FOR REVIEW AND APPROVAL BY OWNER'S REPRESENTATIVE PRIOR TO CONSTRUCTION. SEE ALSO JURISDICTIONAL WETLAND NOTES ON SHEET L1.0. RETAIN AND PROTECT EXISTING FENCE RETAIN AND PROTECT EXISTING GATE RETAIN AND PROTECT BURIED STORM DRAIN. RETAIN AND PROTECT STEEL PLATES. RETAIN AND PROTECT PLANTING AT EAST OF SITE. VEHICULAR ACCESS ROUTE ON EXISTING GRAVEL TRAIL. ENSURE THAT SITE RECEIVES MINIMAL TRAFFIC THROUGHOUT DURATION OF PROJECT. SEE DEMOLITION NOTES #5 REGARDING REPAIRING DAMAGE. RETAIN AND PROTECT EXISTING TREE D-101 D-102 D-103 X-101 X-102 X-103 X-104 X-105 X-106 X-107 X-108 X-109 X-110 REFERENCE NOTES SCHEDULE 588 LIMIT OF GRADING TREE PROTECTION MEASURES EXISTING CONDITIONS NOTES 1. CONTRACTOR SHALL BE RESPONSIBLE TO PROTECT AND RETAIN EXISTING HARDSCAPE, ASPHALT PATHS, LANDSCAPING, IRRIGATION, ETC. THAT ARE NOT DESIGNATED FOR DEMOLITION OR MODIFICATION. 2. CONTRACTOR SHALL PROTECT EXISTING ASPHALT PATHS, ROADWAYS, CURBS, MOW CURBS AND OTHER ELEMENTS FROM DAMAGE DURING CONSTRUCTION. 3. CONTRACTOR SHALL BE RESPONSIBLE TO REPAIR AND/OR REPLACE ALL DAMAGED SURFACES, AMENITIES, HARDSCAPES, LANDSCAPE, IRRIGATION, ETC. DUE TO HIS/HER ACTIVITY OR NEGLECT AND AS APPROVED BY THE DISTRICT. 1. THE NATURAL GRADE AROUND THE DRIPLINE OF EXISTING TREES SHALL REMAIN UNDISTURBED DURING AND AFTER CONSTRUCTION. THE UNDISTURBED AREA SHALL BE AT DRIPLINE, BUT IN NO CASE CLOSER THAN 20 FEET FROM THE TREE TRUNK. THE DRIPLINE OF A TREE IS A PROJECTED RADIUS ON THE GROUND FORMED BY THE OUTERMOST EDGE OF THE TREE CANOPY. NO GRADING OR CONSTRUCTION WORK SHALL OCCUR WITHIN DRIPLINE OF TREE. IF EXCAVATION WITHIN DRIPLINE IS NECESSARY THE CONTRACTOR SHALL HAND DIG UNDER THE DIRECTION OF A CERTIFIED ARBORIST APPROVED BY THE CITY. THE CONTRACTOR SHALL HAVE A CERTIFIED ARBORIST ON SITE TO MONITOR ALL ROOT PRUNING AND BRANCH PRUNING OF ALL EXISTING TREES. ROUTE ALL TRENCHING TO AVOID TREES. HAND DIG TRENCH WHERE PRESENT AT LARGE ROOTS, 3/4" DIAMETER OR LARGER. 2. WHERE GRADE CHANGES MUST OCCUR WITHIN THE DRIPLINE, A SUITABLE MITIGATION PLAN SHALL BE DEVELOPED BY EITHER A CERTIFIED ARBORIST. THE PLAN SHALL PROTECT THE TREE FROM EXCESS FILL AND/OR THE REMOVAL OF EXCESS SOIL FROM THE ROOT ZONE. 3. PRIOR TO THE BEGINNING OF CONSTRUCTION, EXISTING TREES SHALL BE PRUNED TO REMOVE LIMBS WHICH MAY BE DEAD OR MAY BECOME DAMAGED DURING CONSTRUCTION. PRUNING SHALL BE PERFORMED CONSISTENT WITH ANSI A300 PRUNING STANDARDS, PRUNE TO THIN 1 IN. 4. A TEMPORARY CONSTRUCTION FENCE SHALL BE INSTALLED AROUND ALL TREE TRUNKS WITHIN CONSTRUCTION ZONE. WRAP TRUNK 4 TIMES AND SECURE FENCING TO TRUNK FOR DURATION OF PROJECT. CONFIRM WITH LANDSCAPE ARCHITECT ON BOUNDARY. THE FENCE SHALL BE SUBSTANTIAL ENOUGH TO RESTRICT ACTIVITY TO OUTSIDE THE AREA AND SHALL BE INSTALLED PRIOR TO ANY GRADING OR OTHER CONSTRUCTION ACTIVITY. DURING CONSTRUCTION, MAINTENANCE SHALL BE PERFORMED SO THAT THE FENCE REMAINS IN GOOD REPAIR. REMOVAL OF THE FENCE SHALL ONLY OCCUR TO ALLOW REQUIRED CONSTRUCTION WITHIN THE AREA OR TO COMPLETE SITE LANDSCAPING. THE LANDSCAPE ARCHITECT SHALL BE CONTACTED, PRIOR TO COMMENCEMENT OF CONSTRUCTION, TO INSPECT FENCING AND TO APPROVE ANY CONSTRUCTION WITHIN THE DRIPLINE. 5. TREES TO BE RETAINED SHALL BE PROTECTED BY CONSTRUCTION FENCING AT THE DRIPLINE. CONSTRUCTION FENCE SHALL BE 4 FT. HIGH ORANGE PLASTIC MESH OR APPROVED EQUIVALENT SUPPORTED ON STEEL T-POST A MINIMUM OF 6 FT. LONG. FENCING MAY OCCUR AT THE COMBINED DRIPLINES OF GROVES OF TREES. APPROVED ARBORIST SHALL MARK TREES PROTECTION MEASURES SHALL BE INSTALLED PRIOR TO START OF CONSTRUCTION. 6. UNDERGROUND FACILITIES AND TRENCHES, (e.g., UTILITY SERVICES, SANITARY SEWER, OR STORM DRAINAGE LINES) SHALL BE CONSOLIDATED, TO THE EXTENT FEASIBLE, AND LOCATED TO MINIMIZE IMPACTS UPON TREE ROOT SYSTEMS. ANY TRENCHING OR UNDERGROUND WORK SHOULD BE LOCATED OUTSIDE OF THE TREE DRIPLINE. ANY TRENCHING REQUIRED WITHIN THE TREE DRIPLINE SHALL BE AS FAR FROM THE TREE TRUNK AS POSSIBLE AND SHALL BE EXCAVATED BY HAND TO MINIMIZE IMPACT ON ROOTS. ALL TRENCHING WITHIN THE DRIPLINE SHALL BE SUPERVISED BY A CERTIFIED ARBORIST. 7. ROOTS 3/4 IN. OR GREATER IN SIZE ENCOUNTERED DURING TRENCHING SHALL BE CLEANLY CUT AND TREATED WITH A SEALING AGENT TO REDUCE LOSS OF MOISTURE TO THE TREE. ROOTS GREATER THAN 1-1/2 IN. SHALL BE PRESERVED AND PROTECTED AT THE DIRECTION OF A CERTIFIED ARBORIST. 8. CONSTRUCTION VEHICLES, EQUIPMENT, OR MATERIALS SHALL NOT BE PARKED OR STORED WITHIN THE FENCED AREA. NO STAGING OR STORAGE AREA FOR CONSTRUCTION SHALL BE LOCATED CLOSER THAN 50 FEET TO THE DRIPLINE OF ANY TREE TO BE PROTECTED. 9. ALL CONSTRUCTION WASTES, INCLUDING BUT NOT LIMITED TO BUILDING MATERIAL DEBRIS, ROOFING MATERIALS, CLEANING OF CEMENT TRUCKS, CHEMICALS/ADHESIVES/SOLVENTS, ETC., SHALL BE STORED NO CLOSER THAN 50 FEET FROM ANY TREE DRIPLINE. 1. CONSTRUCTION ENTRY, TRACK OUT, AND CONCRETE WASHOUT AREA LOCATIONS TO BE LOCATED AT NORTHERN CORNER OF SITE. SEE SITE ACCESS, DEMOLITION, AND EXISTING CONDITIONS PLAN. 2. SEE DETAIL 3/L1.1 FOR CONSTRUCTION SITE ACCESS DETAIL. CONSTRUCTION ACCESS NOTES SYMBOL LEGEND SYMBOL DESCRIPTION LIMIT OF WORK, CONSTRUCTION FENCING JURISDICTIONAL WETLAND EXISTING CONTOUR - 1' INTERVALS NEW CONTOUR - 1' INTERVALS AND AS LABELED LIMIT OF GRADING ADJACENT PROPERTY FENCE © MELTON DESIGN GROUP INC COPYRIGHT 2021 SHEET NUMBER MELTON DESIGN GROUP: PROJECT NUMBERS NO. DESCRIPTION DATE DATES SHEET TITLE PROJECT CONSULTANT CLIENT LICENSE 8. 1. 3. 2. 7. 4. 6. 5. 820 BROADWAY ST. CHICO, CA 95928 (530) 899-1616 meltondg.com SHEET ___ OF ___ CITY OF UKIAH RIVERSIDE PARK REGENERATION 2369 30% CD's 03-29-2022 PLOT DATE: May 8, 2024 - 2:50 PM FILE NAME: G:\MDG(2300-2399)\2369 Riverside Park Regeneration - Ukiah\2369 CAD\2369 CDs\SHEETS\2369-L1.0-DEMO-PLAN.dwg 90% CD's 08-18-2023 100% CD's 04-19-2024 -- -- -- -- -- -- -- -- -- -- 14 NORTH EXISTING CONDITIONS, SITE ACCESS, AND DEMOLITION L1.0 3 0 40 80 SCALE: 1" = 40' FENCE - DEMO EXISTING PATH DEBRIS PILES, SEE REFERENCE NOTE D-101 1. CONFIRM ALL LOCATIONS OF EXISTING UTILITIES WITHIN PROJECT SITE PRIOR TO DEMOLITION AND EXCAVATION. THE CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION AND REPAIR OF DAMAGE TO ALL EXISTING UTILITIES DESIGNATED TO REMAIN. CALL ALL APPLICABLE AGENCIES AND USA, (800) 642-2444. THE LANDSCAPE ARCHITECT CANNOT BE RESPONSIBLE FOR THE COMPLETENESS OR ACCURACY OF THIS INFORMATION. PROVISION OF TENTATIVE UTILITY LOCATION DOES NOT IN ANY WAY RELIEVE THE CONTRACTOR OF THE RESPONSIBILITY TO CONTACT USA AND APPLICABLE AGENCIES AND CONDUCT FIELD DISCOVERY TO VERIFY EXISTING CONDITIONS. 2. CONTRACTOR SHALL OBSERVE ALL SAFETY REGULATIONS PERTAINING TO THIS PROJECT. 3. ANY CHANGES SHALL BE APPROVED BY THE OWNER PRIOR TO CONSTRUCTION. 4. ALL VEGETATION AND OTHER UNSUITABLE MATERIAL IN AREAS OF FOUNDATIONS, CONCRETE SLABS, AND DECOMPOSED GRANITE SHALL BE REMOVED FROM CONSTRUCTION AREA AND DISPOSED OF OFF-SITE. 5. CONTRACTOR SHALL BE RESPONSIBLE TO PROTECT ALL EXISTING HARDSCAPE, AGGREGATE SURFACES AND LANDSCAPES (INCLUDING TREES), UNLESS CALLED OUT FOR DEMOLITION ON THIS SHEET, FROM DAMAGE DURING THE COURSE OF CONSTRUCTION. CONTRACTOR SHALL REPLACE OR REPAIR ANY DAMAGE TO HARDSCAPES, AGGREGATES AND LANDSCAPES RESULTING FROM CONSTRUCTION ACTIVITIES AT CONTRACTOR'S EXPENSE. 6. REFER TO BOOK FORM SPECIFICATIONS FOR ADDITIONAL INFORMATION. DEMOLITION NOTES
586.5 586.00 LP 586.00 LP 586.00 LP 586.00 LP 586.00 LP 594.10 HP 594.10 HP 591.05 HP 594.10 HP 592.15 HP (589.40) PATH (588.60) PATH (588.50) PATH (588.80) PATH (588.90) PATH (588.00) PATH 586.50 ELEV 586.44 ELEV 586.92 FL 588.01 OUTFALL (588.57) PATH (587.72) PATH (590.00) PATH (590.81) PATH (591.51) PATH (591.96) PATH 586.76 FL 586.45 FL 586.81 FL 586.80 FL 586.89 FL 580585 578 579581 582 583 584586587 580585578 579581 582 583 584 586 587 588
588
590 590
587588
589
591 591 592 592 593 593 594 594 590589 591 592 593 594 591 592 593 594 594 590 589 588 591 587 588 587
588 589
586 592
592 589.80 LP 3L1.6 1L1.4 2L1.5 587 589 587 590591 (589.49) PATH (586.84) PATH 588 590 590 588 588 586584 582 588 588.22 588.26
589
2%
2%
586.25 586.25
586.25
586.25
587 EXISTING CONDITIONS NOTE #4 LIMIT OF WORK LIMIT OF WORK LIMIT OF GRADING LIMIT OF GRADING LIMIT OF GRADING LIMIT OF GRADING EXISTING CONDITIONS NOTE #4 REFER TO FIGURE 1 - SOIL SAMPLE LOCATIONS (SAMPLE S-2) LIMIT OF WORK EXISTING CONDITIONS NOTE #4 LIMIT OF GRADING 578 579EXISTING CONDITIONS NOTE 1. CONTRACTOR SHALL BE RESPONSIBLE TO PROTECT AND RETAIN EXISTING HARDSCAPE, ASPHALT PATHS, LANDSCAPING, IRRIGATION, ETC. THAT ARE NOT DESIGNATED FOR DEMOLITION OR MODIFICATION. 2. CONTRACTOR SHALL COVER EXISTING ASPHALT PATHS, ROADWAYS, CURBS, MOW CURBS AND OTHER ELEMENTS TO PROTECT FROM DAMAGE DURING CONSTRUCTION. 3. CONTRACTOR SHALL BE RESPONSIBLE TO REPAIR AND/OR REPLACE ALL DAMAGED SURFACES, AMENITIES, HARDSCAPES, LANDSCAPE, IRRIGATION, ETC. DUE TO HIS/HER ACTIVITY OR NEGLECT AND AS APPROVED BY THE DISTRICT. 4. NO GRADING SHALL OCCUR IN EXISTING JURISDICTIONAL WETLAND AREAS 1. CONTACT LANDSCAPE ARCHITECT PRIOR TO GRADING IN THE EVENT THAT EXISTING GRADES FOR CONDITIONS ARE NOT AS SHOWN ON PLANS. 2. SLOPE TRAIL TO DRAIN. ELIMINATE ALL LOCALIZED DEPRESSIONS OR "BIRD BATHS". 3. PROVIDE SMOOTH CONTINUOUS CURVE AT TOPS AND BOTTOM OF SLOPES AND OVER FIELD GRADE. 4. DIGITAL COPY OF TOPOGRAPHIC AND GRADING PLAN IS AVAILABLE ON REQUEST. 5. SEE BOOK FORM SPECIFICATIONS FOR ADDITIONAL INFORMATION. 6. PERFORM SURFACE ROUGHENING ON SLOPES TO TEMPORARILY STABILIZE SOIL. PROVIDE EQUIPMENT WITH A TRACK UNDERCARRIAGE CAPABLE OF PRODUCING LINEAR SOIL IMPRESSIONS MEASURING AT LEAST 12" IN LENGTH BY 2" TO 4" IN WIDTH BY 12" TO 2" IN DEPTH. DO NOT EXCEED 12" BETWEEN TRACK CLEATS. INSTALL CONTINUOUS LINEAR TRACK IMPRESSIONS WHERE THE MINIMUM 12" IN LENGTH IS PERPENDICULAR TO THE DIRECTION OF WATER FLOW. PER DETAIL 1/L1.1 7. REFER TO SHEET L2.0 FOR INSTALLATION AND LIMITS OF CLAY LAYER GENERAL GRADING NOTES GRADING LEGEND LIMIT OF WORK EXISTING CONTOUR - 1' INTERVALS NEW CONTOUR - 1' INTERVALS AND AS LABELED NEW SPOT ELEVATION DIRECTION AND PERCENT OF SLOPE - SLOPE TO DRAIN TOE OF SLOPE FLOW LINE (E) JURISDICTIONAL WETLAND: RETAIN AND PROTECT LIMIT OF GRADING FS FINISH SURFACE FG FINISH GRADE TC TOP OF CURB BC BOTTOM OF CURB TR TOP OF RAMP BR BOTTOM OF RAMP VE EDGE OF VAULT INV DRAIN PIPE INLET ELEVATION RIM TOP OF CATCH BASIN GRATE TS TOE OF SLOPE LP LOW POINT HP HIGH POINT FL FLOWLINE (E) EXISTING (P) PROPOSED SYMBOL DESCRIPTION ABBREVIATIONS XX" ABS PIPE S = XX% 586.50 ELEV NORTH © MELTON DESIGN GROUP INC COPYRIGHT 2021 SHEET NUMBER MELTON DESIGN GROUP: PROJECT NUMBERS NO. DESCRIPTION DATE DATES SHEET TITLE PROJECT CONSULTANT CLIENT LICENSE 8. 1. 3. 2. 7. 4. 6. 5. 820 BROADWAY ST. CHICO, CA 95928 (530) 899-1616 meltondg.com SHEET ___ OF ___ CITY OF UKIAH RIVERSIDE PARK REGENERATION 2369 30% CD's 03-29-2022 PLOT DATE: May 8, 2024 - 2:50 PM FILE NAME: G:\MDG(2300-2399)\2369 Riverside Park Regeneration - Ukiah\2369 CAD\2369 CDs\SHEETS\2369-L1.1-GRAD-PLAN.dwg 90% CD's 08-18-2023 100% CD's 04-19-2024 -- -- -- -- -- -- -- -- -- -- 14 0 40 80 SCALE: 1" = 40' GRADING PLAN L1.1 4 SOIL SAMPLE LOCATION MAP SOIL DISPOSAL NOTES EXCERPT - ESA SOIL CONTAMINATION REPORT #1, 04-14-2022 EXCERPT - ESA SOIL CONTAMINATION REPORT #2, 06-05-2022 ESA SOIL CONTAMINATION REPORT #2, 06-05-2022, PAGE 9 VERTICAL AND HORIZONTAL DATUMS WERE PROVIDED BY RRMDESIGNGROUP RIVERSIDE PARK-PHASE ONE ROUGH GRADING PROJECT CONSTRUCTION DOCUMENTS GRADING PLAN DATED JULY 9, 2010. CONFIRMED AS; HORIZONTAL DATUM: NAD 83 ZONE 2 BASED UPON GPS OBSERVATIONS, PROCESSED BY NGS OPUS (SEPTEMBER 18, 2019) WITH CORS STATIONS P192, P190 & P185, REFERENCE EPOCH 2010.00 AT CONTROL POINT #200 VERTICAL DATUM: NAVD 88 BASED UPON GPS OBSERVATIONS, PROCESSED BY NGS OPUS (SEPTEMBER 18, 2019) WITH CORS STATIONS P192, P190 & P185, REFERENCE EPOCH 2010.00 AT CONTROL POINT #200 CONTOUR INTERVAL = 1 FOOT DATUM NOTES SURFACE ROUGHENING NOT TO SCALE 1L1.1 LIMIT OF WORK
Elevation
Elevation Station Station PROFILE VIEW OF GRADING SECTION-1 580.00 585.00 590.00 595.00 600.00 580.00 585.00 590.00 595.00 600.00 -0+50.00 0+00.00 1+00.00 2+00.00 3+00.00 4+00.00 4+62.97 5+00.00 5+50.00 0+00.00 1+00.00 2+00.00 3+00.00 4+00.00 4+62.97 5+00.00 5+50.00 MICRO-DEPRESSION ELEV: 586' PROPOSED SURFACE EXISTING SURFACE OUTFALL ELEV: 587' FLOWLINE ELEV: 586.9' (P) WETLAND HABITAT, SEE NOTE 1 PROPOSED SURFACE CUT FILL (P) WETLAND HABITAT, SEE NOTE 1 GRADING SECTIONS L1.2 5 © MELTON DESIGN GROUP INC COPYRIGHT 2021 SHEET NUMBER MELTON DESIGN GROUP: PROJECT NUMBERS NO. DESCRIPTION DATE DATES SHEET TITLE PROJECT CONSULTANT CLIENT LICENSE 8. 1. 3. 2. 7. 4. 6. 5. 820 BROADWAY ST. CHICO, CA 95928 (530) 899-1616 meltondg.com SHEET ___ OF ___ CITY OF UKIAH RIVERSIDE PARK REGENERATION 2369 30% CD's 03-29-2022 PLOT DATE: May 8, 2024 - 2:50 PM FILE NAME: G:\MDG(2300-2399)\2369 Riverside Park Regeneration - Ukiah\2369 CAD\2369 CDs\SHEETS\2369-L1.1-GRAD-PLAN.dwg 90% CD's 08-18-2023 100% CD's 04-19-2024 -- -- -- -- -- -- -- -- -- -- 14 1. OVEREXCAVATE (P) WETLAND HABITAT AREAS AND BACKFILL WITH COMPACTED CLAY AND NATIVE TOPSOIL AS SHOWN IN DETAIL 3, SHEET L2.0 NOTES:
Elevation
Elevation Station Station PROFILE VIEW OF GRADING SECTION - 2 570.00 575.00 580.00 585.00 590.00 595.00 600.00 570.00 575.00 580.00 585.00 590.00 595.00 600.00 -0+50.00 0+00.00 1+00.00 2+00.00 3+00.00 4+00.00 5+00.00 6+00.00 7+00.00 8+00.00 8+83.90 9+00.00 9+50.00 0+00.00 1+00.00 2+00.00 3+00.00 4+00.00 5+00.00 6+00.00 7+00.00 8+00.00 8+83.90 9+00.00 9+50.00 PROPOSED SURFACE EXISTING SURFACE WATER RETENTION LEVEL ELEV: 577' CUT FILL (P) WETLAND HABITAT, SEE NOTE 1 (P) WETLAND HABITAT, SEE NOTE 1 (E) JURISDICTIONAL WETLAND, RETAIN AND PROTECT GRADING SECTIONS L1.3 6 © MELTON DESIGN GROUP INC COPYRIGHT 2021 SHEET NUMBER MELTON DESIGN GROUP: PROJECT NUMBERS NO. DESCRIPTION DATE DATES SHEET TITLE PROJECT CONSULTANT CLIENT LICENSE 8. 1. 3. 2. 7. 4. 6. 5. 820 BROADWAY ST. CHICO, CA 95928 (530) 899-1616 meltondg.com SHEET ___ OF ___ CITY OF UKIAH RIVERSIDE PARK REGENERATION 2369 30% CD's 03-29-2022 PLOT DATE: May 8, 2024 - 2:50 PM FILE NAME: G:\MDG(2300-2399)\2369 Riverside Park Regeneration - Ukiah\2369 CAD\2369 CDs\SHEETS\2369-L1.1-GRAD-PLAN.dwg 90% CD's 08-18-2023 100% CD's 04-19-2024 -- -- -- -- -- -- -- -- -- -- 14 1. OVEREXCAVATE (P) WETLAND HABITAT AREAS AND BACKFILL WITH COMPACTED CLAY AND NATIVE TOPSOIL AS SHOWN IN DETAIL 3, SHEET L2.0 NOTES:
Elevation
Elevation Station Station 570.00 575.00 580.00 585.00 590.00 595.00 600.00 570.00 575.00 580.00 585.00 590.00 595.00 600.00 -0+50.00 0+00.00 1+00.00 2+00.00 3+00.00 4+00.00 5+00.00 5+35.46 6+00.00 6+50.00 0+00.00 1+00.00 2+00.00 3+00.00 4+00.00 5+00.00 5+35.46 6+00.00 6+50.00 EXISTING SURFACE PROPOSED SURFACE WATER RETENTION LEVEL ELEV: 577' EXISTING PEDESTRIAN PATH CUT FILL (P) WETLAND HABITAT, SEE NOTE 1 (E) JURISDICTIONAL WETLAND, RETAIN AND PROTECT GRADING SECTIONS L1.4 7 © MELTON DESIGN GROUP INC COPYRIGHT 2021 SHEET NUMBER MELTON DESIGN GROUP: PROJECT NUMBERS NO. DESCRIPTION DATE DATES SHEET TITLE PROJECT CONSULTANT CLIENT LICENSE 8. 1. 3. 2. 7. 4. 6. 5. 820 BROADWAY ST. CHICO, CA 95928 (530) 899-1616 meltondg.com SHEET ___ OF ___ CITY OF UKIAH RIVERSIDE PARK REGENERATION 2369 30% CD's 03-29-2022 PLOT DATE: May 8, 2024 - 2:50 PM FILE NAME: G:\MDG(2300-2399)\2369 Riverside Park Regeneration - Ukiah\2369 CAD\2369 CDs\SHEETS\2369-L1.1-GRAD-PLAN.dwg 90% CD's 08-18-2023 100% CD's 04-19-2024 -- -- -- -- -- -- -- -- -- -- 14 1. OVEREXCAVATE (P) WETLAND HABITAT AREAS AND BACKFILL WITH COMPACTED CLAY AND NATIVE TOPSOIL AS SHOWN IN DETAIL 3, SHEET L2.0 NOTES:
01 GENERAL SYMBOL DESCRIPTION DETAIL CLAY LAYER 3/L2.0 PAVING SYMBOL DESCRIPTION DETAIL BASALT CHIP SURFACE (CRUSHER DUST 3/8" MINUS). COMPACT IN 1/L2.0 TWO EQUAL LIFTS. SURFACE TO CONFORM TO ADA REQUIREMENTS. GRAVEL 1" MINUS, 3" DEPTH. COMPACT NATIVE SOIL TO 90% R.D. INSTALL AND COMPACT GRAVEL IN TWO EQUAL LIFTS. SITE FURNISHINGS SYMBOL DESCRIPTION DETAIL BOULDER - SEE BOULDER SCHEDULE FOR SIZES 2/L2.0 01-01 P-101 P-102 S-105 LIMIT OF WORK 586.5 586.00 LP 586.00 LP 586.00 LP 586.00 LP 586.00 LP 594.10 HP 594.10 HP 591.05 HP 594.10 HP 592.15 HP (589.40) PATH (588.60) PATH (588.50) PATH (588.80) PATH (588.90) PATH (588.00) PATH 586.50 ELEV 586.44 ELEV 586.92 FL 588.01 OUTFALL (588.57) PATH (587.72) PATH (590.00) PATH (590.81) PATH (591.51) PATH (591.96) PATH 586.76 FL 586.45 FL 586.81 FL 586.80 FL 586.89 FL 580585 578 579581 582 583 584586587 580585578 579581 582 583 584 586 587 588
588
590 590
587588
589
591 591 592 592 593 593 594 594
590
589 591 592 593 594
591 592 593 594
594 590 589 588 591 587 588
587
588 589
592 586
592 589.80 LP 587
589
587 590591 (589.49) PATH (586.84) PATH 588 590 590 588 588 586584 582 588 588.22 588.26
589
586.25 586.25
586.25
586.25
587 2 13 2 2 23 2 12 1 2 1 P-101 P-101 S-105 S-105 01-01 01-01 01-01 P-102 LIMIT OF WORK CONFORM TO EXISTING PATH CONFORM TO EXISTING PATH SYMBOL DESCRIPTION 2' x 2' BOULDER 4 2' x 4' BOULDER 7 4' x 6' BOULDER 2 213 QUANTITY EXISTING CONDITIONS NOTE 1. CONTRACTOR SHALL BE RESPONSIBLE TO PROTECT AND RETAIN EXISTING HARDSCAPE, ASPHALT PATHS, LANDSCAPING, IRRIGATION, ETC. THAT ARE NOT DESIGNATED FOR DEMOLITION OR MODIFICATION. 2. CONTRACTOR SHALL COVER EXISTING ASPHALT PATHS, ROADWAYS, CURBS, MOW CURBS AND OTHER ELEMENTS TO PROTECT FROM DAMAGE DURING CONSTRUCTION. 3. CONTRACTOR SHALL BE RESPONSIBLE TO REPAIR AND/OR REPLACE ALL DAMAGED SURFACES, AMENITIES, HARDSCAPES, LANDSCAPE, IRRIGATION, ETC. DUE TO HIS/HER ACTIVITY OR NEGLECT AND AS DIRECTED BY OWNER. REFERENCE NOTES LEGEND 1. CONFIRM ALL LOCATIONS OF EXISTING UTILITIES WITHIN PROJECT SITE PRIOR TO DEMOLITION AND EXCAVATION. THE CONTRACTOR SHALL BE RESPONSIBLE TO PROTECT AND RETAIN EXISTING UTILITIES AND THE REPAIR AND/OR REPLACEMENT OF UTILITIES DAMAGED DUE TO CONTRACTORS WORK OR NEGLECT. 2. THE LANDSCAPE ARCHITECT CANNOT BE RESPONSIBLE FOR THE COMPLETENESS OR ACCURACY OF EXISTING INFORMATION. PROVISION OF UTILITY LOCATION DOES NOT IN ANY WAY RELIEVE THE CONTRACTOR RESPONSIBILITY TO CONDUCT FIELD DISCOVERY TO VERIFY EXISTING CONDITIONS. 3. THE CONTRACTOR IS RESPONSIBLE TO COORDINATE HIS WORK WITH THE WORK OF OTHERS. 4. CONSTRUCTION SHALL CONFORM TO ALL UNIFORM BUILDING CODES AND SPECIFICATIONS. 5. CONTRACTOR SHALL OBSERVE ALL SAFETY REGULATIONS PERTAINING TO THIS PROJECT. 6. ANY CHANGES SHALL BE APPROVED BY THE LANDSCAPE ARCHITECT PRIOR TO CONSTRUCTION. CONSTRUCTION NOTESBOULDER SCHEDULE CONSTRUCTION PLAN AND DETAILS L2.0 10 © MELTON DESIGN GROUP INC COPYRIGHT 2021 SHEET NUMBER MELTON DESIGN GROUP: PROJECT NUMBERS NO. DESCRIPTION DATE DATES SHEET TITLE PROJECT CONSULTANT CLIENT LICENSE 8. 1. 3. 2. 7. 4. 6. 5. 820 BROADWAY ST. CHICO, CA 95928 (530) 899-1616 meltondg.com SHEET ___ OF ___ CITY OF UKIAH RIVERSIDE PARK REGENERATION 2369 30% CD's 03-29-2022 PLOT DATE: May 8, 2024 - 2:50 PM FILE NAME: G:\MDG(2300-2399)\2369 Riverside Park Regeneration - Ukiah\2369 CAD\2369 CDs\SHEETS\2369-L2.0-CONS-PLAN.dwg 90% CD's 08-18-2023 100% CD's 04-19-2024 -- -- -- -- -- -- -- -- -- -- 14 NORTH 0 40 80 SCALE: 1" = 40' LIMIT OF WORK LIMIT OF WORK JURISDICTIONAL WETLAND SYMBOL LEGEND NOTES: 1. BASALT CHIP SHALL BE BASALT QUARRY FINES, 14 INCH OR LESS. COLOR: MATCH EXISTING. CONTRACTOR TO SUBMIT SAMPLE FOR APPROVAL BY LANDSCAPE ARCHITECT. 2. APPLY WEED KILLER AND PRE-EMERGENT TO AREA PRIOR TO PLACEMENT OF BASALT CHIP. 3. INSTALL IN 2 EQUAL LIFTS. 4. AFTER PLACEMENT OF EACH LIFT, THOROUGHLY WATER UNTIL ENTIRE DEPTH IS MOIST. COMPACT WITH A 1,000 TO 3,000 LB ROLLER AFTER GRADING AND WETTING. SECTION 3 1'-0" VARIES 1'-0" 4" 4" 3 2 1 4 BASALT CHIP SURFACE NOT TO SCALE BASALT CHIP SURFACE PER PLAN. 4" MINIMUM DEPTH AFTER COMPACTION. SLOPE PER GRADING PLAN. 12 COMPACTED SUB-GRADE TO 90% RELATIVE DENSITY. CLEAN-CUT EDGE FOR INSTALLATION EXCAVATION, REPLACE WITH NATIVE TOPSOIL FOR RE-VEGETATION. 34 NATIVE SOIL TO REMAIN UNDISTURBED. 1L2.0 1 5 3 12345 4 7 SURFACE MATERIAL PER CONSTRUCTION PLAN FINISH SURFACE WATER WASHED GRANITE BOULDERS, SIZE PER PLAN. AVAILABLE FROM SIERRA BOULDER, ROBERT WRIGHT (916) 955-0649. CONTRACTOR SHALL PROVIDE PHOTO SAMPLE TO LANDSCAPE ARCHITECT FOR APPROVAL. INSTALL BOULDER SO THAT 25% OF BOULDER IS BELOW FINISH GRADE. NATIVE UNDISTURBED SUBGRADE 6" DEPTH CLASS II AGGREGATE BASE, COMPACT TO 90% RELATIVE DENSITY. HEIGHT AND WEIGHT VARIES. SEE BOULDER SCHEDULE, SHEET L-2.0 67 2 BOULDER INSTALLATION 6 NOT TO SCALE 2L2.0 SEASONAL WETLAND MICRO-DEPRESSION TYPICAL SECTION NOT TO SCALE SEE TYPICAL SECTION EXTEND CLAY LAYER MINIMUM 24" BELOW FINISH GRADE MEASURED PERPENDICULAR TO SLOPE 12 FINISH GRADE 3 WATER LEVEL AT FULL POOL. SEE GRADING PLANS FINISH GRADE NATIVE SOIL COMPACTED TO 85% RELATIVE DENSITY. 8" DEPTH EXCEPT AT EDGES, WHERE 24" DEEP AS SHOWN. REFER TO GRADING PLAN FOR FINAL GRADES 45 BENTONITE CLAY 4" DEPTH. TUCK DOWN 24" AS SHOWN. 6 SUBGRADE, NATIVE SOIL COMPACTED TO 90% RELATIVE DENSITY 3456 2 8" 561 1 23 1 24" 3L2.0 SYMBOL DESCRIPTION
LIMIT OF WORK LIMIT OF WORK LIMIT OF WORK 586.5 586.00 LP 586.00 LP 586.00 LP 586.00 LP 586.00 LP 594.10 HP 594.10 HP 591.05 HP 594.10 HP 592.15 HP (589.40) PATH (588.60) PATH (588.50) PATH (588.80) PATH (588.90) PATH (588.00) PATH 586.50 ELEV 586.44 ELEV 586.92 FL 588.01 OUTFALL (588.57) PATH (587.72) PATH (590.00) PATH (590.81) PATH (591.51) PATH (591.96) PATH 586.76 FL 586.45 FL 586.81 FL 586.80 FL 586.89 FL 580585 578 579581 582 583 584586587 580585578 579581 582 583 584 586 587 588
588
590 590
587588
589
591 591 592 592 593 593 594 594
590
589
591
592
593 594
591 592 593 594
594 590 589 588 591 587 588
587
588 589
586 592
592 589.80 LP 587
589
587
590
591
(589.49) PATH
(586.84) PATH
588
590
590
588
588 586584 582
588 588.22 588.26
589
586.25 586.25
586.25
586.25
587
SAMPLE GRASS MIX PATTERN, 1:1.5 RATIO CAREX TO ELYMUS CAREX BARBARAE 36" O.C. ELYMUS TRITICOIDES 24" O.C. TREES CODE BOTANICAL NAME COMMON NAME SIZE QTY POP FRE POPULUS FREMONTII FREMONT COTTONWOOD TREEPOT4 29 QUE LOB QUERCUS LOBATA VALLEY OAK TREEPOT4 48 QUE WIS QUERCUS WISLIZENI INTERIOR LIVE OAK TREEPOT4 5 SAL LAE SALIX LAEVIGATA RED WILLOW TREEPOT4 17 LARGE SHRUBS CODE BOTANICAL NAME COMMON NAME SIZE COR SER CORNUS SERICEA RED TWIG DOGWOOD DEEPOT (D40) HET ARB HETEROMELES ARBUTIFOLIA TOYON DEEPOT (D40) SAM NIG SAMBUCUS NIGRA SSP. CAERULERA MEXICAN ELDERBERRY DEEPOT (D40) SHRUBS CODE BOTANICAL NAME COMMON NAME SIZE ROS CAL ROSA CALIFORNICA CALIFORNIA WILD ROSE DEEPOT (D40) SYM ALB SYMPHORICARPOS ALBUS LAEVIGATUS COMMON SNOWBERRY DEEPOT (D40) FRA CAL FRANGULA CALIFORNICA COFFEEBERRY DEEPOT (D40) GRASSES CODE BOTANICAL NAME COMMON NAME SIZE CAR BAR CAREX BARBARAE SANTA BARBARA SEDGE SUPERCELL REFER TO SAMPLE GRASS MIX PATTERN ELY TRI ELYMUS TRITICOIDES WILD RYE SUPERCELL REFER TO SAMPLE GRASS MIX PATTERN 15' x 15' SQUARE (NOT TO SCALE) 393493379101,185 1,738 TOTAL GRASSES: 2,923 1. VERIFY EXACT LOCATION OF ALL UNDERGROUND UTILITIES PRIOR TO CONSTRUCTION. 2. ALL PLANT MATERIAL TO BE SET UP FOR REVIEW BY LANDSCAPE ARCHITECT PRIOR TO INSTALLATION. NO SUBSTITUTIONS FOR PLANT MATERIAL WILL BE ALLOWED UNLESS PRIOR ARRANGEMENTS HAVE BEEN APPROVED BY LANDSCAPE ARCHITECT. IN THE EVENT OF PLANT MATERIAL UNAVAILABILITY, CONTACT LANDSCAPE ARCHITECT FOR ALTERNATIVE SOURCES OR APPROVED SPECIES SUBSTITUTION. 3. PLANT QUANTITIES ARE FOR CONVENIENCE OF THE CONTRACTOR. CONTRACTOR TO CONFIRM EXACT NUMBER. 4. TREE STAKES ARE TO BE PLACED PERPENDICULAR TO PREVAILING WINDS. REMOVE NURSERY STAKES, REPLACE WITH STAKES PER DETAIL. TREE TIES SHALL BE CINCH-TIE OR EQUAL. 5. ALL TREE, SHRUB AND GROUND COVER PLANTINGS TO HAVE BARK MULCH PLACED AROUND PLANT BASE PER PLANTING DETAILS. SEE CONSTRUCTION PLAN. 6. REFER TO PLANS, DETAILS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION. 7. PLANT MATERIAL SHALL BE BID ON THE BASIS OF SPECIES AND CONTAINER SIZE, NOT ON CONTAINER SIZE ALONE.
NORTH PLANTING PLAN L3.0 11 © MELTON DESIGN GROUP INC COPYRIGHT 2021 SHEET NUMBER MELTON DESIGN GROUP: PROJECT NUMBERS NO. DESCRIPTION DATE DATES SHEET TITLE PROJECT CONSULTANT CLIENT LICENSE 8. 1. 3. 2. 7. 4. 6. 5. 820 BROADWAY ST. CHICO, CA 95928 (530) 899-1616 meltondg.com SHEET ___ OF ___ CITY OF UKIAH RIVERSIDE PARK REGENERATION 2369 30% CD's 03-29-2022 PLOT DATE: May 22, 2024 - 5:07 PM FILE NAME: G:\MDG(2300-2399)\2369 Riverside Park Regeneration - Ukiah\2369 CAD\2369 CDs\SHEETS\2369-L3.0-PLNT-PLAN.dwg 90% CD's 08-18-2023 100% CD's 04-19-2024 -- -- -- -- -- -- -- -- -- -- 14 0 40 80 SCALE: 1" = 40' HYDROSEED SCHEDULE PLANT SCHEDULE PLANTING NOTES LIMIT OF WORK JURISDICTIONAL WETLAND SYMBOL LEGEND SYMBOL DESCRIPTION
PLANTING DETAILS L3.1 12 © MELTON DESIGN GROUP INC COPYRIGHT 2021 SHEET NUMBER MELTON DESIGN GROUP: PROJECT NUMBERS NO. DESCRIPTION DATE DATES SHEET TITLE PROJECT CONSULTANT CLIENT LICENSE 8. 1. 3. 2. 7. 4. 6. 5. 820 BROADWAY ST. CHICO, CA 95928 (530) 899-1616 meltondg.com SHEET ___ OF ___ CITY OF UKIAH RIVERSIDE PARK REGENERATION 2369 30% CD's 03-29-2022 PLOT DATE: May 8, 2024 - 2:50 PM FILE NAME: G:\MDG(2300-2399)\2369 Riverside Park Regeneration - Ukiah\2369 CAD\2369 CDs\SHEETS\2369-L3.0-PLNT-PLAN.dwg 90% CD's 08-18-2023 100% CD's 04-19-2024 -- -- -- -- -- -- -- -- -- -- 14 12 3 456 ROOT BALL + 2" 2X ROOT BALL 7 TREE/SHRUB PLANTING 8 SET ROOT BALL CROWN 1" HIGHER THAN SURROUNDING FINISHED GRADE. 1 SLOPE FINISHED GRADE AT BACKFILL AWAY FROM ROOT BALL. 23 FINISHED GRADE. 4 PLANT TABLETS PER SPECIFICATIONS 5 BACKFILL MIX, SEE NOTES AND SPECIFICATIONS. 6 NATIVE SOIL MIX FIRMLY COMPACTED. GOPHER BASKET: GALVANIZED CHICKEN WIRE, EXPOSE 2" ABOVE GRADE. FOLD-IN AT BOTTOM FOR FULL COVERAGE AT SIDES AND BOTTOM. PLACE BASKET BEFORE BACKFILL AND PLANTING. 7 36" PROTECTIVE TREE TUBE AVAILABLE THROUGH TREE PRO (800) 875-8071 OR APPROVED EQUAL. INSTALL ON TREES ONLY PER MANUFACTURER'S RECOMMENDATIONS. 8 ROOT BALL NOT TO SCALE 1L3.1 ROOT BALL + 2" 2X ROOT BALL TREE/SHRUB PLANTING ON SLOPE ROOT BALL NOT TO SCALE 8 5 6 11 SET ROOT BALL CROWN 1" HIGHER THAN TOP OF BACKFILL MIX 1 SLOPE FINISHED GRADE AT BACKFILL AWAY FROM ROOT BALL. 23 ORIGINAL GRADE. 4 PLANT TABLETS PER SPECIFICATIONS 5 BACKFILL MIX, SEE NOTES AND SPECIFICATIONS. 6 NATIVE SOIL MIX FIRMLY COMPACTED. GOPHER BASKET: GALVANIZED CHICKEN WIRE, EXPOSE 2" ABOVE GRADE. FOLD-IN AT BOTTOM FOR FULL COVERAGE AT SIDES AND BOTTOM. PLACE BASKET BEFORE BACKFILL AND PLANTING. 7 36" PROTECTIVE TREE TUBE AVAILABLE THROUGH TREE PRO (800) 875-8071 OR APPROVED EQUAL. INSTALL ON TREES ONLY PER MANUFACTURER'S RECOMMENDATIONS. 8 ORIGINAL SLOPE SHOULD PASS THROUGH THE POINT WHERE THE TRUNK BASE MEETS SUBSTRATE/SOIL. 9 PRIOR TO MULCHING, LIGHTLY TAMP SOIL AROUND THE ROOT BALL IN 6" LIFTS TO BRACE TREE. DO NOT OVER COMPACT. WHEN THE PLANTING HOLE HAS BEEN BACKFILLED, POUR WATER AROUND THE ROOT BALL TO SETTLE THE SOIL. 10 ROUND-TOPPED SOIL BERM ABOVE ROOT BALL SURFACE SHALL BE CENTERED ON THE DOWNHILL SIDE OF THE ROOT BALL FOR 240°. 11 3 7 10 4 12 9 L3.1 2 PLAN SECTION VIEW EQ. EQ. 1234 5 6 7 FINISH SURFACE WITH 2" OF TOP DRESSING OF MULCH. SEE SPECS. 12 SOIL BELOW MULCH AMENDED SOIL. SEE PLANS FOR SOIL PREPARATION. 34 EXISTING SOIL GROUNDCOVER PLANTS TO BE TRIANGULARLY SPACED, ROWS OFFSET 86% PLANT DISTANCE. 56 MULCH PER PLAN. 7 ADJACENT PAVING PER PLAN. NOTES: 1. SEE PLANTING LEGEND FOR GROUNDCOVER SPECIES AND SIZE. 2. SETTLE SOIL AROUND ROOT BALL OF EACH GROUNDCOVER PRIOR TO MULCHING. 6" MIN GROUND COVER PLANTING
86%
DISTANCE L3.1 NOT TO SCALE 3
586.5 586.00 LP 586.00 LP 586.00 LP 586.00 LP 586.00 LP 594.10 HP 594.10 HP 591.05 HP 594.10 HP 592.15 HP (589.40) PATH (588.60) PATH (588.50) PATH (588.80) PATH (588.90) PATH (588.00) PATH 586.50 ELEV 586.44 ELEV 586.92 FL 588.01 OUTFALL (588.57) PATH (587.72) PATH (590.00) PATH (590.81) PATH (591.51) PATH (591.96) PATH 586.76 FL 586.45 FL 586.81 FL 586.80 FL 586.89 FL 580585 578 579581 582 583 584586587 580585578 579581 582 583 584 586 587 588
588
590 590
587588
589
591 591 592 592 593 593 594 594 590589 591 592 593 594 591 592 593 594 594 590 589 588 591 587 588 587
588 589
586 592
592 589.80 LP 587
589
587 590591 (589.49) PATH (586.84) PATH 588 590 590 588 588 586584 582 588 588.22 588.26
589
586.25 586.25
586.25
586.25
587 POC CONNECT TO (E) 2" MAIN LINE, VERIFY LOCATION. MAINTAIN 2'-0" OFF EDGE OF PAVING EXISTING 2" MAIN LINE EXISTING 2" MAIN LINE 114" 112" 112" 114" 114" 1" 2 1 37.2 12"1 1 28.6 12" 2" 3 1 29.4 12"4 1 24.8 12" 1" 114" 114" 1" 1" CAP MAIN LINE, INSTALL IN ROUND IRRIGATION BOX. 2" 25° (likely) full trajectory of 45' CAP MAIN LINE, INSTALL IN ROUND IRRIGATION BOX. 1" 112" 1" 114" 114" 1" LIMIT OF WORK LIMIT OF WORK LIMIT OF WORK SYMBOL MANUFACTURER/MODEL/DESCRIPTION HUNTER ICZ-151-XL-40 DRIP CONTROL ZONE KIT. 1-1/2IN. ICV GLOBE VALVE WITH 1IN. HY100 FILTER SYSTEM. PRESSURE REGULATION: 40PSI. FLOW RANGE: 20 GPM TO 60 GPM. 120 MESH STAINLESS STEEL SCREEN. 1-1/2IN. INLET X SINGLE 2IN. OUTLET. IF DC LATCHING SOLENOID NOT INCLUDED, ORDER SEPARATELY, IF NEEDED, IN ORDER TO BE COMPATIBLE WITH HUNTER NODE BATTERY CONTROLLER. HUNTER NODE-200 2-STATION BATTERY-POWERED CONTROLLER TO BE INSTALLED INSIDE VALVE BOX PIPE TRANSITION POINT PIPE TRANSITION POINT FROM PVC LATERAL TO HUNTER HDL-06-12-CV DRIP LINE. RUN DRIP TUBING TO ALL PLANTS AND TREES WITHIN DASHED LINE BOUNDARY SHOWN ON PLANS. INSTALL TWO LINES TO EACH TREE/PLANT IN GROUPS OR ROWS, OR SINGLE LOOP, AS SHOWN IN DRIP IRRIGATION DETAILS. ALL DRIP LINE SHALL BE INSTALLED ON-GRADE. SYMBOL MANUFACTURER/MODEL/DESCRIPTION HUNTER HQ-44LRC QUICK COUPLER VALVE QUICK COUPLER VALVE, YELLOW RUBBER LOCKING COVER, RED BRASS AND STAINLESS STEEL, WITH 1IN. NPT INLET, 2-PIECE BODY. ISOLATION VALVE ISOLATION VALVE - 2" AND SMALLER - WILKINS 850-XL FULL PORT BRONZE BALL VALVE. 2-1/2" AND LARGER - NIBCO 619-RW-SON FLANGED GATE VALVE WITH SQ. OP. NUT. SIZE PER PIPE SIZE. LOCATION SHOWN FOR GRAPHIC CLARITY. INSTALL IN PLANTER. CONTRACTOR SHALL LOCATE FOR LANDSCAPE ARCHITECT APPROVAL PRIOR TO INSTALLATION. IRRIGATION LATERAL LINE: PVC SCHEDULE 40 IRRIGATION MAINLINE: PVC SCHEDULE 40 PIPE SLEEVE: PVC SCHEDULE 40 SCHEDULE 40 PVC AT 2X LINE SIZE FOR LATERALS, CONDUIT AND MAINLINE UNDER ALL PAVING, TYPICAL, WHETHER SHOWN OR NOT. COORDINATE LOCATIONS WITH GENERAL CONTRACTOR PRIOR TO PAVING INSTALLATION. WIRES AND MAINLINE SHALL BE PLACED ON SEPARATE SLEEVES. IRRIGATION SCHEDULE NORTH IRRIGATION PLAN L4.0 13 © MELTON DESIGN GROUP INC COPYRIGHT 2021 SHEET NUMBER MELTON DESIGN GROUP: PROJECT NUMBERS NO. DESCRIPTION DATE DATES SHEET TITLE PROJECT CONSULTANT CLIENT LICENSE 8. 1. 3. 2. 7. 4. 6. 5. 820 BROADWAY ST. CHICO, CA 95928 (530) 899-1616 meltondg.com SHEET ___ OF ___ CITY OF UKIAH RIVERSIDE PARK REGENERATION 2369 30% CD's 03-29-2022 PLOT DATE: May 8, 2024 - 2:50 PM FILE NAME: G:\MDG(2300-2399)\2369 Riverside Park Regeneration - Ukiah\2369 CAD\2369 CDs\SHEETS\2369-L4.0-IRRG-PLAN.dwg 90% CD's 08-18-2023 100% CD's 04-19-2024 -- -- -- -- -- -- -- -- -- -- 14 0 40 80 SCALE: 1" = 40' LIMIT OF WORK JURISDICTIONAL WETLAND SYMBOL LEGEND SYMBOL DESCRIPTION DUE TO THE SCALE OF THE DRAWINGS, IT IS NOT POSSIBLE TO INDICATE ALL OFFSET FITTINGS, SLEEVES, ETC., WHICH MAY BE REQUIRED. THE CONTRACTOR SHALL CAREFULLY INVESTIGATE THE STRUCTURAL AND FINISHED CONDITIONS AFFECTING ALL OF THE WORK AND PLAN ACCORDINGLY, FURNISHING SUCH FITTINGS, MISCELLANEOUS COMPONENTS, ETC., AS MAY BE REQUIRED TO MEET SUCH CONDITIONS. DRAWINGS ARE GENERALLY DIAGRAMMATIC AND INDICATIVE OF THE WORK TO BE INSTALLED. THE WORK SHALL BE INSTALLED IN THE MOST DIRECT AND COMPETENT MANNER, SO THAT CONFLICTS BETWEEN THE IRRIGATION WATER SYSTEMS AND EXISTING AND NEW UTILITIES, PLANTING, AND ARCHITECTURAL FEATURES WILL BE AVOIDED. ROUTING OF MAIN LINE AND LATERALS ARE DIAGRAMMATIC. INSTALL ALL MAINLINE, LATERALS AND VALVES IN PLANTERS EXCEPT WHEN CROSSING BENEATH PAVEMENT, WALK WAYS, ETC. ALL MAIN LINE AND LATERALS CROSSING BENEATH PAVEMENT, CONCRETE, FOUNDATIONS, WALLS, ETC. SHALL BE INSTALLED IN SLEEVES. SEE DETAILS AND SPECIFICATIONS FOR TYPE. SIZE TO PROVIDE A MINIMUM OF 25% VOID SPACE IN SLEEVE AFTER PIPES ARE INSTALLED. GRAPHIC CLARITY: 1. THIS SYSTEM IS DESIGNED FOR A MAXIMUM DEMAND OF 50 GPM AND 85 PSI AT POINT OF CONNECTION WITH A 6-HOUR WATER WINDOW. THE CONTRACTOR SHALL BE RESPONSIBLE TO VERIFY EXISTING CONDITIONS. COORDINATE WITH OWNER TO REVIEW IRRIGATION SYSTEM PRIOR TO START OF WORK. IN THE EVENT THAT EXISTING CONDITIONS ARE DIFFERENT THAN STATED, CONTACT LANDSCAPE ARCHITECT PRIOR TO CONSTRUCTION. 2. THE INTENT OF THIS IRRIGATION SYSTEM IS TO PROVIDE THE MINIMUM AMOUNT OF WATER REQUIRED TO SUSTAIN GOOD PLANT HEALTH. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO PROGRAM THE IRRIGATION CONTROLLER BASED ON RECOMMENDATIONS FROM THE LANDSCAPE WATER AUDIT AND AS REQUIRED BY THE 2020 UPDATED MODEL WATER EFFICIENT LANDSCAPE ORDINANCE, CALIFORNIA CODE OF REGULATIONS TITLE 23, DIVISION 2, CHAPTER 2.7 AND EXISTING FIELD CONDITIONS. THE CONTRACTOR SHALL MAKE SCHEDULING ADJUSTMENTS AS NEEDED TO ACHIEVE THE MOST EFFICIENT APPLICATION OF WATER BASED ON PLANT TYPE, WATER USE REQUIREMENTS, SOIL TYPE, GRADES, SUN EXPOSURE, SHADE, WIND, ETC. 3. THIS DRAWING IS DIAGRAMMATIC. IRRIGATION COMPONENTS SHOWN BENEATH PAVING, UTILITIES, PLANTINGS, ETC. ARE FOR GRAPHIC CLARITY ONLY. PLACE ALL PIPING, VALVES, AND OTHER IRRIGATION COMPONENTS WITHIN THE ADJACENT PLANTER EXCEPT WHERE PIPES CROSSOVER BENEATH PAVING, STRUCTURES, WALLS, ETC.. THE CONTRACTOR SHALL PLACE PIPING TO PREVENT CONFLICT WITH UTILITIES, TREE LOCATIONS, PLANTING, HARDSCAPE COMPONENTS, WATER PLAY FEATURES, PLAY AREAS AND FURNISHINGS. SEE PLANTING PLAN FOR PLANT COUNT AND LAYOUT. REFER TO CONTRACT DOCUMENTS FOR PROJECT SCOPE. 4. THE CONTRACTOR SHALL PROVIDE COMPLETE RECORD DRAWINGS TO OWNER AT COMPLETION OF PROJECT AND AS REQUIRED BY CONTRACT DOCUMENTS. 5. THE IRRIGATION SYSTEM IS DESIGNED TO OPERATE AT THE FOLLOWING PRESSURES: DRIP LINE - 40 PSI. ALL IRRIGATION SHALL BE INSTALLED BY CONTRACTOR AT THE LOCATIONS INDICATED ON THE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF CONTRACTOR TO NOTIFY LANDSCAPE ARCHITECT OF ANY DEVIATION WHICH MAY AFFECT THE SPACING OR LOCATION OF THE IRRIGATION LAYOUT. 6. TRENCH IRRIGATION MAIN LINES TO A DEPTH OF 24"; AND LATERALS TO A DEPTH OF 18". DO NOT TRENCH DRIPLINE AT ALL; LEAVE ON GRADE. TRENCH ALL MAIN AND LATERAL LINES TO A DEPTH OF 24" WHERE CROSSING BENEATH EXISTING PATH AND PLACE WITHIN SLEEVE, SIZE AND TYPE PER PLAN. 7. CONTRACTOR SHALL BE RESPONSIBLE TO SLEEVE ALL MAIN LINES AND LATERAL LINES WHEN CROSSING BENEATH PAVEMENT, WALKWAYS, BUILDINGS, WALLS, ETC. WHETHER OR NOT SHOWN ON THE IRRIGATION PLAN. SIZE PER PLAN AND/OR AS NEEDED BASED ON THE NUMBER OF IRRIGATION LINES AND SIZES. CONTROL WIRES SHALL BE SLEEVED INDEPENDENTLY. CONTRACTOR SHALL BE RESPONSIBLE TO COORDINATE WITH OTHER TRADES TO INSTALL SLEEVES REQUIRED. 8. ALL IRRIGATION REMOTE CONTROL VALVES, QUICK COUPLER VALVES, ELECTRIC PULL BOXES SHALL BE INSTALLED IN PLANTED AREAS AND IN VALVE BOXES. NO VALVES/VALVE BOXES SHALL BE INSTALLED IN PAVED AREAS OR IN TURF AREAS. VALVE BOXES SHALL BE GREEN, EXCEPT IF IN DECOMPOSED GRANITE, IN WHICH CASE THEY SHALL BE TAN COLOR. 9. CONTRACTOR SHALL BE RESPONSIBLE TO PROVIDE A COMPLETE LANDSCAPE WATER AUDIT PER REQUIREMENTS SET FORTH IN THE 2015 UPDATED MODEL WATER EFFICIENT LANDSCAPE ORDINANCE, CALIFORNIA CODE OF REGULATIONS TITLE 23, DIVISION 2, CHAPTER2.7. CONTRACTOR SHALL MAKE FINAL ADJUSTMENTS TO THE IRRIGATION SYSTEM BASED ON LANDSCAPE WATER AUDIT RECOMMENDATIONS. SEE CONTRACT DOCUMENTS. 10. MAIN LINE PIPE SIZE TO BE AS NOTED ON PLANS. LATERAL PIPE SIZE DOWNSTREAM OF LAST PIPE SIZE CALL OUT TO BE 1" PIPE. 11. SEE CONTRACT DOCUMENTS, SPECIFICATIONS AND DETAILS FOR ADDITIONAL INFORMATION. 12. INSTALL ALL IRRIGATION EQUIPMENT MINIMUM 2'-0" OFF EDGE OF PAVING IRRIGATION NOTES:
IRRIGATION BOX LAYOUT NOT TO SCALE RECTANGULAR VALVE BOX 12" 12" 12" 12" TYPICAL EDGE OF LAWN, WALK, FENCE, CURB, BUILDING, ETC. NOTES: 1. CENTER VALVE BOX OVER REMOTE CONTROL VALVE TO FACILITATE SERVICING VALVE. 2. SET REMOTE CONTROL VALVE AND VALVE BOX ASSEMBLY IN LEVEL AREA OF PLANTER OR TURF AS SHOWN ON PLAN. NO IRRIGATION BOXES SHALL BE INSTALLED IN CONCRETE, SIDEWALKS, PATHS, ROAD WAYS, ETC. 3. SET VALVE BOXES ON LEVEL BED, 6" DEEP OF 3/4" CRUSHED ROCK. PLACE 1/4" GALVANIZED WIRE MESH DIRECTLY BENEATH VALVE BOX ON TOP OF GRAVEL LEVELING BED. 4. SET BOXES PARALLEL TO EACH OTHER AND PERPENDICULAR TO EDGE OF LAWN, WALK, FENCE, CURB, BUILDING, ETC. 5. AVOID HEAVILY COMPACTING SOIL AROUND VALVE BOXES TO PREVENT COLLAPSE AND DEFORMATION OF VALVE BOX SIDES. 6. INSTALL VALVE BOX EXTENSION BY VALVE BOX MANUFACTURER AS REQUIRED TO COMPLETELY ENCLOSE VALVE ASSEMBLY. 7. SET TOP OF BOX ABOVE SUB-GRADE: 3-1/4" FOR DECOMPOSED GRANITE AREAS; 1-1/2" IN TURF AREAS. SET VALVE BOX HEIGHT TO MATCH GRADE OF ADJACENT HARDSCAPE. 8. VALVE BOXES IN TURF SHALL BE GREEN, VALVE BOXES IN DECOMPOSED GRANITE SHALL BE TAN. 9. GROUP VALVES TOGETHER AS SHOWN ON PLAN AND NOT TO EXCEED 3 VALVE BOXES IN ONE LOCATION. STAKE LOCATION OF VALVES BOXES WITH DIMENSIONS OF AREA REQUIRED FOR APPROVAL BY LANDSCAPE ARCHITECT PRIOR TO CONSTRUCTION. 10. NO VALVES OR VALVE BOXES SHALL BE INSTALLED WITHIN SIX (6) FEET OF AN EXITING OR NEW TREE LOCATION. TOP VIEW L4.1 2 IRRIGATION DETAILS L4.1 14 © MELTON DESIGN GROUP INC COPYRIGHT 2021 SHEET NUMBER MELTON DESIGN GROUP: PROJECT NUMBERS NO. DESCRIPTION DATE DATES SHEET TITLE PROJECT CONSULTANT CLIENT LICENSE 8. 1. 3. 2. 7. 4. 6. 5. 820 BROADWAY ST. CHICO, CA 95928 (530) 899-1616 meltondg.com SHEET ___ OF ___ CITY OF UKIAH RIVERSIDE PARK REGENERATION 2369 30% CD's 03-29-2022 PLOT DATE: May 8, 2024 - 2:50 PM FILE NAME: G:\MDG(2300-2399)\2369 Riverside Park Regeneration - Ukiah\2369 CAD\2369 CDs\SHEETS\2369-L4.0-IRRG-PLAN.dwg 90% CD's 08-18-2023 100% CD's 04-19-2024 -- -- -- -- -- -- -- -- -- -- 14 SECTION VIEW NOTES: 1. GATE VALVES 2" AND SMALLER SHALL BE THREADED. 2. WHEN THE MAIN LINE IS TERMINATED AT THE VALVE, EXTEND MAIN LINE 48" BEYOND VALVE BOX AND CAP. 6" 6" 1 4 567891011122 6813 3 3" 1 FINISH GRADE SET TOP OF BOX ABOVE FINISH GRADE: 1/2" IN SEED, 1-1/2" IN SOD, 3-1/2" IN PLANTER OR DECOMPOSED GRANITE 2 ALLOW 3" BETWEEN TOP OF THE INTERIOR VALVE BOX COVER AND PVC PIPE 3 GREEN PLASTIC VALVE BOX WITH BOLT DOWN LOC-KIT; CARSON MODEL 910 OR APPROVED EQUAL 45 8" DIAMETER PVC PIPE; LENGTH AS NEEDED 6 3/4" CRUSHED ROCK; 6" MINIMUM DEPTH BALL VALVE, SIZE PER PIPE SIZE; WITH BRONZE CROSS HANDLE. SEE SPECIFICATIONS. 7 PVC SCHEDULE 40 OR CLASS 315 MAIN LINE AS PER PLAN 89 PVC SCHEDULE 40 COUPLER 10 PVC SCHEDULE 80 T.O.E. NIPPLE 11 1/4" GALVANIZED WIRE CLOTH WRAP ALL PVC PIPE EXPOSED TO CRUSHED ROCK WITH 20MIL CORROSION RESISTANT TAPE. 12 SAND BACKFILL; 6" ABOVE AND BELOW MAIN LINES 13 GATE VALVE L4.1 NOT TO SCALE 3 1 3 4 5 6 8 791011 12 1415 16 17 18 1920 21 2 13 QUICK COUPLER VALVE NOT TO SCALE 1 FINISH GRADE SET TOP OF BOX ABOVE SUBGRADE: 2-1/4" DECOMPOSED GRANITE; 1-1/2" IN TURF. SET VALVE BOX HEIGHT TO MATCH GRADE OF ADJACENT HARDSCAPE 2 QUICK COUPLING VALVE WITH LOCKING YELLOW RUBBER COVER 34 SET VALVE BOX 12" MIN. FROM EDGE OF HARDSCAPE 5 CURB, HEADER OR PAVING WHERE APPLICABLE CONCRETE VALVE BOX WITH TL STYLE LOCKING COVER 6 MANUFACTURED TRIPLE SWING JOINT, KBI MODEL TSA-1000- TT OR APPROVED EQUAL 7 SELF RESTRAINED FITTINGS; LEEMCO SERIES RF OR APPROVED EQUAL. INSTALL AS PER MANUFACTURER'S SPECIFICATIONS. 8 9 PVC MAIN LINE; TYPE AND SIZE PER PLAN 10 3/4" CRUSHED ROCK, 6" MINIMUM DEPTH 11 1/4" GALVANIZED WIRE CLOTH 1-1/2" ANGLE IRON; SECURE TO QUICK COUPLER VALVE WITH STAINLESS STEEL HOSE CLAMPS AND SCREWS (TYP. 2 PLCS.) 12 SAND BACKFILL; 6" ABOVE AND 6" BELOW MAIN LINE WRAPPED WITH GEOTEXTILE FABRIC 13 UNDISTURBED SUBGRADE OR COMPACTED BACKFILL PER SPECIFICATIONS 1415 PVC SCHEDULE 80 NIPPLE; LENGTH AS NEEDED STAINLESS STEEL HOSE CLAMP WITH STAINLESS STEEL SCREWS (TYP. 2 PLCS.) 16 1" FULL PORT BALL VALVE; INSTALL WITH MIN. 6" CLEARANCE ABOVE GRAVEL SO LEVER HANDLE CAN OPEN AND CLOSE FOR OPERATION AND MAINTENANCE. 17 DISTANCE BETWEEN QUICK COUPLER COVER AND TOP OF VALVE BOX SHALL ALLOW QUICK COUPLER KEY TO ROTATE IN FULL CIRCLE WITHOUT INTERFERENCE. 18 12" HDPE SMOOTH INTERIOR WALL PIPE SLEEVE. INSTALL WITH SQUARE CUT 4" ABOVE GRAVEL INSIDE VALVE BOX WITH ENOUGH ROOM TO OPERATE BALL VALVE. 19 T.CHRISTY ID TAG MODEL ID-MAX-B2-NP012. ATTACH TO VALVE STEM USING NYLON CABLE TIE. 20 WRAP MAIN LINE TRENCH IN GEOTEXTILE FABRIC, INSTALL 6" SAND BELOW AND ABOVE MAINLINE, OVERLAP GEOTEXTILE FABRIC ON TOP, BACKFILL WITH APPROVED MATERIAL. TYPICAL FOR MAIN LINE TRENCH. SEE SPECIFICATIONS. 21 L4.1 4 DRIP FLUSH VALVE NOT TO SCALE AUTOMATIC FLUSH VALVE PER MANUFACTURER'S SPECIFICATION PVC EXHAUST HEADER OR DRIP LINE PER PLAN GEO-TEXTILE FILTER FABRIC; ENCASE DRAIN SUMP AND STAPLE TO EXTERIOR OF VALVE BOX. 3/4" CRUSHED ROCK DRAIN SUMP; 2' DIA. X 2' DEPTH. FINISH GRADE - SEE LANDSCAPE PLAN UNDISTURBED SUBGRADE 8 6 2 4 6 1 3 4" BACKFILL LAYER; COMPACTED TO SAME DENSITY AS SUBGRADE ROUND PLASTIC VALVE BOX CARSON MODEL 708 GREEN OR APPROVED EQUAL 5 7 12345678 L4.1 9 SECTION VIEW 24" 6" 1 34278 TRENCHING 5 6 6" 18" 1 FINISH GRADE PER LANDSCAPE PLAN. APPROVED BACKFILL PER PLANTING PLAN. 2 SAND BACKFILL, MINIMUM 6" ABOVE AND BELOW MAIN LINE WITH MINIMUM 6" BACKFILL. 3 MAIN LINE DETECTION TAPE: T.CHRISTY MODEL TA-DT-3-BIRR OR APPROVED EQUAL. INSTALL ABOVE IRRIGATION MAIN LINE PIPE PER MANUFACTURER'S SPECIFICATIONS. 4 PVC SCHEDULE 40 CONDUIT WITH WIRE CABLE AND PULL TAPE, SIZE PER PLANS. 5 WIDTH AS REQUIRED TO MAINTAIN MINIMUM 4" HORIZONTAL SEPARATION FROM PIPE TO PIPE AND PIPE TO TRENCH WALL. NO PIPE SHALL BE LAID OVER ANOTHER. 6 IRRIGATION MAIN LINE. SIZE AND TYPE PER PLAN. 24" MINIMUM COVER. 7 PVC LATERAL, SIZE AND TYPE PER PLAN. 18" MINIMUM COVER. 8 L4.1 NOT TO SCALE 1 AIR RELIEF VALVE NOT TO SCALE 2 1 3 5 4 67 8 9 1 DRIP LINE, BLANK DRIP TUBING, OR PVC EXHAUST HEADER, PER PLANS 2 DRIPLINE TEE ADAPTER 3 3/4" X 1/2" REDUCER BUSHING AIR RELIEF VALVE PER MANUFACTURER'S SPECIFICATION. INSTALL AT HIGH POINTS ON DRIP LINE 45 FINISH GRADE, SEE LANDSCAPE PLAN GEO-TEXTILE FILTER FABRIC; SURROUND AGGREGATE AND STAPLE TO EXTERIOR OF VALVE BOX. 6 3/4" CRUSHED ROCK; 6" DEPTH. EXTEND 6" BEYOND VALVE BOX IN ALL DIRECTIONS. 78 ROUND PLASTIC VALVE BOX CARSON MODEL 708 GREEN OR APPROVED EQUAL 9 UNDISTURBED SUBGRADE L4.1 10 15 5 8 17 13 12 17 4 20 6 18 24" MIN. 14 11 19 2" 12" FROM HARDSCAPE 8673541 15 3" PVC SCHEDULE 40 CONDUIT 3" PVC SCHEDULE 40 CONDUIT SWEEP, COUPLED BOTH ENDS 1617 181213141110 9 19 TRIM VALVE BOX TO PROVIDE 1" CLEARANCE OVER PIPE REMOTE CONTROL VALVE ASSEMBLY; NORMALLY OPEN. SIZE AND MODEL PER PLAN. FINISH GRADE - SEE GRADING PLAN. PVC LATERAL LINE; SIZE AND TYPE PER PLAN. PROVIDE 18" LENGTH PRIOR TO FIRST FITTING. SCHEDULE 80 PVC UNION, SXS (TYP. 2 PLCS.) PVC SCHEDULE-80 90 DEG ELBOW, SXS PVC SCHEDULE 80 T.O.E. NIPPLE, LENGTH AS NEEDED, MIN. 6" LENGTH PVC MAIN LINE; SIZE AND TYPE PER PLAN. 24" MINIMUM COVER. SEE SPECIFICATIONS. 3/4" CRUSHED ROCK; 6" DEPTH. EXTEND 6" BEYOND VALVE BOX IN ALL DIRECTIONS. SCHEDULE 80 PVC TEE (SxSxS) 1/4" GALVANIZED WIRE CLOTH - INSTALL ON TOP OF CRUSHED DRAIN ROCK 6" BEYOND EDGE OF VALVE BOX IN ALL DIRECTIONS 2 LOCKING WATERPROOF WIRE CONNECTOR, DBR/Y-6 OR APPROVED EQUAL. SAND BACKFILL; 6" ABOVE AND 6" BELOW MAIN LINE, PER SPECIFICATIONS 20 SET TOP OF BOX ABOVE SUBGRADE: 3-1/4" DECOMPOSED GRANITE; 1-1/2" IN TURF. SET VALVE BOX HEIGHT TO MATCH GRADE OF ADJACENT HARDSCAPE. 21 PVC SCHEDULE 80 ELBOW, SXS 22 3" PVC SCHEDULE 40 CONDUIT RISER. INSTALL COUPLERS AT END, CLR 2" ABOVE DRAIN ROCK 3 16 12 GA COMMON WIRE (WHITE), 14 GA CONTROL WIRE (RED) PER SPECIFICATIONS - PROVIDE 24" SPARE LOOP WRAPPED NEAT ALONG INTERIOR VALVE BOX. INSTALL (1) SPARE 12 GA COMMON WIRE (GREEN) AND (1) SPARE 14 GA CONTROL WIRE (YELLOW) ALONG ENTIRE MAIN LINE AND LOOPED INTO EACH VALVE BOX. 21 T.CHRISTY ID TAG MODEL ID-STD-Y2; YELLOW PRINTED WITH CONTROLLER/VALVE NUMBER ON 2 SIDES AND ID-MAX-B2-NP012. ATTACH BOTH TAGS TO VALVE STEM USING NYLON CABLE TIE. 6" 23 PVC SCH80 BALL VALVE, SIZE PER VALVE SIZE 12 CARSON PLASTIC VALVE BOX 1220 WITH LOCK KIT AND L-BOLT, GREEN OR APPROVED EQUAL. VALVE BOX TO BE LARGE ENOUGH TO ENCLOSE ENTIRE VALVE ASSEMBLY. LID MARKED IRRIGATION. 2 12 23 22 24 24 HEIGHT BELOW GRADE TO ALLOW MIN. 3" CLR FROM VALVE TO BOTTOM OF VALVE BOX LID. USE PVC 45 DEG ELBOWS DOWNSTREAM OF VALVE TO OBTAIN 18" COVER ON LATERALS. HY100 SCREEN FILTER, 100 MESH 12 9 9 25 25 REMOTE CONTROL DRIP ZONE ASSEMBLY SECTION VIEW NOT TO SCALE 5L4.1 PIPE TRANSITION POINT TO DRIP LINE 4" 18" NOTE: SECURE DRIP LINE TO FINISH GRADE USING 6" WIRE STAPLES INSTALL WIRE STAPLES EVERY THREE (3) FEET. 12345678 9 SECTION VIEW 1 FINISH GRADE- SEE LANDSCAPE PLAN 2 DRIP LINE TEE DRIP LINE ON SURFACE WHERE OCCURS; DRIP LINE MANUFACTURER PER PLAN 34 BLANK TUBING, LENGTH AS NEEDED 5 3/4" MALE ADAPTER 6 PVC SCHEDULE 40 SUB HEADER PVC SCHEDULE 40 TEE WITH 3/4" THREADED OUTLET 7 UNIFORMLY PREPARED SUBGRADE COMPACTED TO 90% RELATIVE DENSITY. SEE DRIP LINE MANUFACTURER'S SPECIFICATIONS. 89 4" APPROVED BACKFILL L4.1 NOT TO SCALE 6 TREES/SHRUBS DRIP - TWO LINES NOT TO SCALE 23 SECTION VIEW 5 1 7 6 10 9 8 11 NOTES: 1. ALL DRIPLINE SHALL BE LEFT ON GRADE 2. BLANK LEADER NOT TO EXCEED 48" IN LENGTH 3. LOCATE DRIP LINE WITHIN WATER RETENTION BERM. INSTALL MINIMUM DISTANCE OF 6" FROM BASE OF SHRUB/TREE 4. ALL DRIP LINE/BLANK TUBING JOINTS SHALL HAVE BARB FITTINGS AS NEEDED 12 PLAN VIEW 8 6" 6" 4 8111 BLANK DRIP LINE TO PVC LATERAL AND IN BETWEEN DRIP LINE RUNS AS NEEDED; NOT TO EXCEED 48" IN LENGTH, WITH 6" GALVANIZED STAPLES EVERY 36" AND AT JOINTS DRIP LINE - MANUFACTURER AND MODEL PER PLAN. INSTALL TWO LINES WITH ALTERNATING EMITTER PATTERN. TRANSITION. SEE PIPE TRANSITION POINT TO DRIP LINE DETAIL PVC LATERAL LINE 5 WATER RETENTION BERM AS PER PLANTING PLAN 4231 PLANTING HOLE BACKFILL MIX PER PLANTING PLAN TOP DRESSING PER PLANTING PLAN SHRUB/TREE PLANTING PER PLANTING PLAN FINISH GRADE 10 NATIVE SUBGRADE 987611 RUN DRIP LINE 6" FROM CENTER OF EACH TREE/SHRUB ON BOTH SIDES DRIP FLUSH VALVE AT END OF EACH DRIP LINE RUN, SEE FLUSH VALVE DETAIL 12 32 L4.1 7 SHRUB/TREE BASE 9" BLANK PE TUBING PER PLANS INLINE EMITTER DRIP TUBING, PER PLANS. 5 EMITTERS PER DRIP LINE LOOP AT 12" O.C. EMITTER SPACING. TOTAL 0.05 GPM PER LOOP IF EACH EMITTER IS 0.6 GPH 6" GALVANIZED SOIL STAPLE, TYP. 5 PLACES ON LOOP, AT EACH JOINT, AND EVERY 36" ON BLANK PE TUBING TREES/SHRUBS DRIP - SINGLE LOOP BARB-TO-BARB COUPLING, HUNTER 17MM PLD-CPL OR EQUAL TO OTHER SHRUBS/TREES AND/OR PIPE TRANSITION POINT. INSTALL FLUSH VALVE AT ENDS OF EACH DRIP RUN, SEE FLUSH VALVE DETAIL. PLAN VIEW NOTES: 1. INSTALL LOOP AT A DISTANCE OF 9" FROM PLANT CENTER. NOT TO SCALE 8L4.1
Agenda Item No: 14.a.
MEETING DATE/TIME: 7/17/2024
ITEM NO: 2024-319
AGENDA SUMMARY REPORT
SUBJECT: Adoption of Resolution to Enter into a Third Phase Agreement for Renewable Power Purchase Agreement with Grace Orchard Energy Center, LLC, and Authorize the City Manager to Execute the Agreement.
DEPARTMENT: Electric Utility PREPARED BY: Cindy Sauers, Electric Utility Director PRESENTER: Cindy Sauers, Electric Utility Director
ATTACHMENTS:
1. CPUC Clean Energy Graphic - 1
2. Grace Orchard Energy Center Renewable Power Purchase Agreement - Final (Clean - Redacted)
3. Grace_Solar_Third_Phase_Agreement - Final (Clean)
4. Resolution Grace Orchard Energy Center Third Phase Agreement Summary: Council will consider adopting a Resolution to enter into a Third Phase Agreement for Renewable Power Purchase Agreement with Grace Orchard Energy Center, LLC.
Background: Twenty years ago, when California launched the Renewables Portfolio Standard (RPS) program, renewable energy sources represented a modest fraction of the state’s electricity consumption. The latest data from 2022 reveals a significant milestone: over 39 percent of California’s retail electricity sales now stem from RPS-certified renewables. When combined with significant contributions from large hydroelectric and nuclear power sources, a remarkable 61 percent of our state’s retail electricity sales derive from zerocarbon, clean generation sources. See Attachment 1 for a graph detailing California's Progress Toward 100% Clean Electricity.
California continues to make substantial strides towards achieving some of the most ambitious clean energy objectives nationwide. Senate Bill 100, enacted in 2018, established a renewable energy target of 60 percent by 2030, with a longer-term vision of powering 100 percent of California’s retail sales and state loads using RPS-certified renewable and zero-carbon energy by 2045. Recent legislative updates have further reinforced the state's commitment with new interim targets: 90 percent by 2035 and 95 percent by 2040.
The City of Ukiah Electric Utility is dedicated to increasing its supply of energy sourced from eligible renewable and carbon-free resources to comply with the California Renewable Energy Resources Act. Currently, the City's energy mix includes eligible renewable power from geothermal, small hydro, and solar. Large hydro, which is classified as carbon free, but not eligible renewable, is a large portion of the City's portfolio. The City's current portfolio boasts between 40-50% eligible renewable and 50-80% carbon free, depending on how much hydro production is achieved. Note that these numbers are based on gross energy procured through co-ownership of plants and long-term contracts, but doesn't take into account the sale of Renewable Energy Credits, which the Utility often participates in. In order to achieve 60% eligible renewable by 2030, the Utility continuously reviews projects that are economically and logistically feasible. As a member of Northern California Power Agency (NCPA), the City has a broader range of opportunities for projects where the risk can be shared with other municipal utilities.
Discussion: Northern California Power Agency, acting on behalf of its members, issued a Request for Proposals for renewable energy resources, carbon-free resources and energy storage solutions. Several
offers were received and analyzed. Grace Orchard Energy Center, LLC submitted a competitive, energy-only project.
Grace Orchard Energy Center, LLC (Grace) has agreed to sell energy, capacity rights, and associated environmental attributes from a 50 MW solar photovoltaic facility in Riverside County, California, to NCPA, on behalf of the City of Ukiah and other participating NCPA members. The terms are outlined in the Power Purchase Agreement (PPA) between Grace and NCPA (see Attachment 2). The City's portion of the project is 3MW and the term of the PPA is 20 years with a guaranteed commercial operation date of December 1, 2027. During the term of the PPA, NCPA will schedule and dispatch Grace, and Grace Orchard Energy Center LLC, will own, operate and maintain the facility.
The attached PPA is redacted due to a non-disclosure agreement between NCPA and Grace, and Grace's ongoing negotiations with other parties. However, based on the agreement details, the anticipated annual output for Ukiah would be 8,521 MWh, at a total cost of $362,256 per year. In the first year, the energy delivery projection is 8,816 MWh at a cost of $374,787. These values, along with other project aspects, stood out among the proposals as a very competitive project and will provide some of the lowest cost energy in the City's current portfolio.
To enable NCPA to enter into the PPA on behalf of the City of Ukiah and other participating members (individually called "Participants" and collectively "Participants"), the Participants shall enter into a Third Phase Agreement (Attachment 3) that provides everything necessary for NCPA to fulfill its obligations under the PPA.
This includes enabling and obligating the Participants to receive and pay for the electric capacity and energy, as well as reimbursing NCPA for all related costs. This is all in accordance with the terms and conditions of the Amended and Restated Facilities Agreement executed in 2014 between NCPA and the City of Ukiah. The Third Phase Agreement outlines the rights and responsibilities of NCPA and the Participants for managing the PPA. It requires each Participant to pay its share of all project, administrative services, scheduling coordination, and any other costs related to the PPA, based on their Project Participation Percentage.
Upon full execution of the Third Phase Agreement, NCPA will be authorized to enter into the PPA on behalf of the Participants, and such PPA shall be deemed an NCPA Project by the NCPA Commission pursuant to the Amended and Restated Facilities Agreement.
Participating in this project will boost the City's eligible renewable energy by approximately 8%, bringing us even closer to the City's goals for a greener future! Additionally, adding eligible renewable resources aligns with the City's climate action goals, supports the General Plan, and ensures that all customers benefit from clean energy.
Staff recommends Adopting Resolution (Attachment 4) authorizing the City of Ukiah to enter into a Third Phase Agreement for Renewable Power Purchase Agreement (PPA) with Grace Orchard Energy Center, LLC, including any nonsubstantive modifications to the PPA and Third Phase Agreement approved by the Member Counsel and authorize the City Manager to execute the agreement.
Recommended Action: Adopt Resolution authorizing the City of Ukiah to enter into a Third Phase Agreement for Renewable Power Purchase Agreement (PPA) with Grace Orchard Energy Center, LLC (Third Phase Agreement), including any nonsubstantive modifications to the PPA and Third Phase Agreement approved by the Member Counsel, and authorize the City Manager to execute the agreement.
BUDGET AMENDMENT REQUIRED: No
CURRENT BUDGET AMOUNT: 80026440.26440 $12,399,300.
PROPOSED BUDGET AMOUNT: N/A
FINANCING SOURCE: Electric Administration Power Purchase PREVIOUS CONTRACT/PURCHASE ORDER NO.: N/A
COORDINATED WITH: David Rapport, City Attorney
DIVERSITY-EQUITY INITIATIVES (DEI): N/A
CLIMATE INITIATIVES (CI): 1d – Continue plan to meet statewide goals for purchased power by 2030.
GENERAL PLAN ELEMENTS (GP):GP-A5 - Environment and Sustainability Element
Attachment 1
Source:
https://www.energy.ca.gov/programs-and-topics/topics/renewable-energy/clean-energy-servingcalifornia#:~:text=Senate%20Bill%20100%20(2018)%20set,2035%20and%2095%25%20for%202040
Cover Sheet
RENEWABLE POWER PURCHASE AGREEMENT
COVER SHEET
Seller: Grace Orchard Energy Center, LLC, a Delaware limited liability company Buyer: Northern California Power Agency, a joint powers agency of the State of California Description of Facility: A 50 MWAC solar photovoltaic generating facility located in Riverside County, California, as further described in Exhibit A.
Milestones:
Milestone Date for
Completion
Evidence of Site Control 9/1/2025
Executed Interconnection Agreement Completed
Guaranteed Construction Start Date 9/1/2026
Guaranteed Commercial Operation Date 12/1/2027
Delivery Term: The period for Product delivery will be for twenty (20) Contract Years.
Expected Energy: The amount of Expected Energy is set forth below.
Contract Year Expected Energy (MWh)
1 146,941
2 146,885
3 146,372
4 145,848
5 145,315
6 144,773
7 144,221
8 143,660
9 143,089
10 142,508
11 141,916
12 141,314
Attachment 2
Cover Sheet
13 140,703
14 140,083
15 139,454
16 138,816
17 138,168
18 137,509
19 136,836
20 136,151
Guaranteed Capacity: 50 MWAC
Dedicated Interconnection Capacity: 50 MWAC
Contract Price:
Contract Year Contract Price
1 – 20 $42.51/MWh (flat) with no
escalation
Product:
Facility Energy
Green Attributes, including, but not limited to, Portfolio Content Category 1 Renewable Energy Credits
Scheduling Coordinator: Buyer or Buyer’s agent
Development Security: $100/kW of Guaranteed Capacity
Performance Security: $75/kW of Installed Capacity
TABLE OF CONTENTS
i
ARTICLE 1 DEFINITIONS ........................................................................................................ 1
1.1 Contract Definitions............................................................................................. 1
1.2 Rules of Interpretation ...................................................................................... 23 ARTICLE 2 TERM; CONDITIONS PRECEDENT.................................................................. 24
2.1 Contract Term.................................................................................................... 24
2.2 Conditions Precedent......................................................................................... 25
2.3 Development; Construction; Progress Reports............................................... 26
2.4 Remedial Action Plan ........................................................................................ 26
2.5 New PV Trade Measure Events and UFLPA/WRO Restraints .................... 27
2.6 Seller’s Pre-COD Termination Right............................................................... 28
2.7 CEQA.................................................................................................................. 28 ARTICLE 3 PURCHASE AND SALE...................................................................................... 28
3.1 Purchase and Sale of Product........................................................................... 28
3.2 Sale of Green Attributes.................................................................................... 29
3.3 Imbalance Energy .............................................................................................. 29
3.4 Ownership of Renewable Energy Incentives................................................... 29
3.5 Future Environmental Attributes .................................................................... 29
3.6 Test Energy......................................................................................................... 29
3.7 CEC Certification and Verification ................................................................. 30
3.8 RPS Standard Terms and Conditions.............................................................. 30
3.9 Compliance Expenditure Cap........................................................................... 31
3.10 Project Configuration........................................................................................ 32 ARTICLE 4 OBLIGATIONS AND DELIVERIES................................................................... 32
4.1 Delivery ............................................................................................................... 32
4.2 Title and Risk of Loss........................................................................................ 33
4.3 Forecasting.......................................................................................................... 33
4.4 Dispatch Down/Curtailment ............................................................................. 34
4.5 Reduction in Delivery Obligation..................................................................... 35
4.6 Guaranteed Energy Production........................................................................ 36
4.7 WREGIS ............................................................................................................. 37
4.8 Interconnection Costs........................................................................................ 38 ARTICLE 5 TAXES .................................................................................................................. 38
5.1 Allocation of Taxes and Charges...................................................................... 38
5.2 Cooperation ........................................................................................................ 38 ARTICLE 6 OPERATIONS AND MAINTENANCE OF THE FACILITY ............................ 39
6.1 Operation and Maintenance of the Facility..................................................... 39
6.2 Maintenance of Health and Safety ................................................................... 39
6.3 Shared Facilities................................................................................................. 39 ARTICLE 7 METERING........................................................................................................... 40
ii
7.1 Metering.............................................................................................................. 40
7.2 Meter Verification.............................................................................................. 41 ARTICLE 8 INVOICING AND PAYMENT; CREDIT............................................................ 41
8.1 Invoicing.............................................................................................................. 41
8.2 Payment .............................................................................................................. 42
8.3 Books and Records............................................................................................. 42
8.4 Payment Adjustments; Billing Errors ............................................................. 42
8.5 Billing Disputes................................................................................................... 42
8.6 Netting of Payments........................................................................................... 43
8.7 Seller’s Development Security .......................................................................... 43
8.8 Seller’s Performance Security .......................................................................... 43
8.9 Buyer Credit Support........................................................................................ 44
8.10 First Priority Security Interest in Cash or Cash Equivalent Collateral....... 44
8.11 Financial Statements.......................................................................................... 45 ARTICLE 9 NOTICES .............................................................................................................. 46
9.1 Addresses for the Delivery of Notices............................................................... 46
9.2 Acceptable Means of Delivering Notice ........................................................... 46 ARTICLE 10 FORCE MAJEURE............................................................................................. 46
10.1 Definition ............................................................................................................ 46
10.2 No Liability If a Force Majeure Event Occurs ............................................... 47
10.3 Notice................................................................................................................... 47
10.4 Termination Following Force Majeure Event................................................. 48 ARTICLE 11 DEFAULTS; REMEDIES; TERMINATION..................................................... 48
11.1 Events of Default................................................................................................ 48
11.2 Remedies; Declaration of Early Termination Date ........................................ 51
11.3 Termination Payment........................................................................................ 52
11.4 Notice of Payment of Damage Payment or Termination Payment ............... 52
11.5 Disputes With Respect to Damage Payment or Termination Payment........ 52
11.6 Rights And Remedies Are Cumulative ............................................................ 53
11.7 Seller’s Pre-COD Liability Limitation............................................................. 53 ARTICLE 12 LIMITATION OF LIABILITY AND EXCLUSION OF WARRANTIES ........ 53
12.1 No Consequential Damages............................................................................... 53
12.2 Waiver and Exclusion of Other Damages........................................................ 53 ARTICLE 13 REPRESENTATIONS AND WARRANTIES; AUTHORITY.......................... 54
13.1 Seller’s Representations and Warranties ........................................................ 54
13.2 Buyer’s Representations and Warranties........................................................ 55
13.3 General Covenants............................................................................................. 55
13.4 Prevailing Wage ................................................................................................. 56 ARTICLE 14 ASSIGNMENT.................................................................................................... 56
14.1 General Prohibition on Assignments ............................................................... 56
iii
14.2 Collateral Assignment; Financing Cooperation.............................................. 57
14.3 Other Permitted Assignments and Transfers by Seller.................................. 57 ARTICLE 15 DISPUTE RESOLUTION................................................................................... 57
15.1 Governing Law................................................................................................... 57
15.2 Venue................................................................................................................... 57
15.3 Judicial Reference.............................................................................................. 57
15.4 Dispute Resolution ............................................................................................. 58 ARTICLE 16 INDEMNIFICATION ......................................................................................... 58
16.1 Indemnification .................................................................................................. 58 ARTICLE 17 INSURANCE ...................................................................................................... 58
17.1 Insurance ............................................................................................................ 58 ARTICLE 18 CONFIDENTIAL INFORMATION................................................................... 59
18.1 Definition of Confidential Information............................................................ 59
18.2 Duty to Maintain Confidentiality ..................................................................... 60
18.3 Irreparable Injury; Remedies........................................................................... 60
18.4 Disclosure to Lenders, Etc................................................................................. 61
18.5 Public Announcements...................................................................................... 61 ARTICLE 19 MISCELLANEOUS............................................................................................ 61
19.1 Entire Agreement; Integration; Exhibits......................................................... 61
19.2 Amendments....................................................................................................... 61
19.3 No Waiver ........................................................................................................... 61
19.4 No Agency, Partnership, Joint Venture or Lease ........................................... 61
19.5 Severability ......................................................................................................... 62
19.6 Mobile-Sierra...................................................................................................... 62
19.7 Counterparts; Electronic Signatures ............................................................... 62
19.8 Electronic Delivery............................................................................................. 62
19.9 Binding Effect..................................................................................................... 62
19.10 No Recourse to Members of Buyer................................................................... 62
19.11 Forward Contract; Inapplicability/Waiver of Bankruptcy Code Section 366 .......................................................................................................... 62
19.12 Further Assurances............................................................................................ 63
19.13 Change in Electric Market Design ................................................................... 63
iv
Exhibits:
Exhibit A Facility Description
Exhibit B Major Project Development Milestones and Commercial Operation Exhibit C Compensation
Exhibit D-1 Scheduling Coordinator Responsibilities
Exhibit D-2 Buyer and Seller Operating Coordination
Exhibit E Progress Reporting Form
Exhibit F-1 Form of Average Expected Energy Report
Exhibit F-2 Form of Monthly Available Generating Capacity Report Exhibit G Guaranteed Energy Production Damages Calculation Exhibit H Form of Commercial Operation Date Certificate Exhibit I Form of Installed Capacity Certificate
Exhibit J Form of Construction Start Date Certificate
Exhibit K Form of Letter of Credit issued on behalf of Seller for the benefit of Buyer Exhibit L Form of Guaranty
Exhibit M Reserved
Exhibit N Notices
Exhibit O Form of Consent and Agreement
Exhibit P Form of Estoppel Certificate
Exhibit Q Form of Letter of Credit issued on behalf of Buyer for the benefit of Seller Exhibit R Metering Diagram
Exhibit S Performance Test
1 RENEWABLE POWER PURCHASE AGREEMENT
This Renewable Power Purchase Agreement (“Agreement”) is entered into as of _________, 2024 (the “Effective Date”), between Buyer and Seller. Buyer and Seller are sometimes referred to herein individually as a “Party” and jointly as the “Parties.” All capitalized terms used in this Agreement are used with the meanings ascribed to them in Article 1 to this Agreement.
RECITALS
WHEREAS, Seller intends to develop, construct, own or otherwise control, and operate the Facility; and
WHEREAS, Seller desires to sell, and Buyer desires to purchase, on the terms and conditions set forth in this Agreement, the Product;
NOW THEREFORE, in consideration of the mutual covenants and agreements herein contained, and for other good and valuable consideration, the sufficiency and adequacy of which are hereby acknowledged, the Parties agree to the following:
ARTICLE 1
DEFINITIONS
1.1 Contract Definitions. The following terms, when used herein with initial capitalization, shall have the meanings set forth below:
“AASMTC AD/CVD Case” means the filing of, and any proceedings, rulemakings, orders, determinations, tariffs, or duties related to, any of the Petitions for the Imposition of Antidumping and Countervailing Duties, filed on or around April 24, 2024 by the American Alliance for Solar Manufacturing Trade Committee, concerning Crystalline Silicon Photovoltaic Cells, Whether or Not Assembled into Modules, from Cambodia, Malaysia, Thailand, and Vietnam, in any of the DOC dockets A-555-003, A-557-830, A-549-851, A-552-841, C-555-004, C-557-831, C-549-852, or C-552-842
“AC” means alternating current.
“Acceptable Issuer” means a U.S. commercial bank, or a foreign bank with a U.S. branch, with such bank having at least $10 billion of assets and having a Credit Rating of at least A- from S&P or A3 from Moody’s.
“Accepted Compliance Costs” has the meaning set forth in Section 3.9. “AD/CVD” means antidumping and/or countervailing duty.
“Adjusted Days of Liquidity on Hand” or “ADLH” means the calculation below using figures and terms from Buyer’s Audited Financial Statements published on Buyer’s website:
2 “Adjusted Energy Production” has the meaning set forth in Exhibit G. “Affiliate” means, with respect to any Person, each Person that directly or indirectly controls, is controlled by, or is under common control with such designated Person. For purposes of this definition and the definition of “Permitted Transfer” and “Permitted Transferee”, “control” (including, with correlative meanings, the terms “controlled by”, and “under common control with”), as used with respect to any Person, shall mean (a) the direct or indirect right to cast at least fifty percent (50%) of the votes exercisable at an annual general meeting (or its equivalent) of such Person or, if there are no such rights, ownership of at least fifty percent (50%) of the equity or other ownership interest in such Person, or (b) the right to direct the policies or operations of such Person. Notwithstanding the foregoing, with respect to Seller, Affiliate shall include any investment funds or publicly-traded vehicles for the ownership of operating power generation, storage, or transmission assets (such as a “yield co”) controlled by Seller, NextEra Energy, Inc. or an Affiliate of NextEra Energy, Inc., NextEra Energy Partners, LP (“NEP”), NextEra Energy Operating Partners, LP (“NEOP”), and NextEra Energy Capital Holdings, Inc. (“NEECH”), and their respective direct or indirect subsidiaries.
“After-Tax Basis” means, with respect to any payment received, or deemed to have been received, by any Person, the amount of such payment (the “Base Payment”), supplemented by a further payment (the “Additional Payment”) to such Person so that the sum of the Base Payment plus the Additional Payment will be equal to the Base Payment, after deduction of the amount of all taxes required to be paid by such Person in respect of the receipt or accrual of the Base Payment and the Additional Payment (taking into account any current or previous credits or deductions arising from the underlying event giving rise to the payment, the Base Payment and the Additional Payment). Such calculations shall be made on the assumption that the recipient is subject to Federal income taxation at the statutory rate applicable to corporations under subchapter C of the Internal Revenue Code of 1986, as amended, and subject to the highest state and local income tax rate then in effect for corporations in the states in which the Person is subject to taxation during the applicable fiscal year, and shall take into account the deductibility, if applicable (for Federal income tax purposes), of state and local income taxes.
“Agreement” has the meaning set forth in the Preamble and includes any Exhibits, schedules and any written supplements hereto, the Cover Sheet, and any designated collateral, credit support or similar arrangement between the Parties. “Approved Forecast Vendor” means (i) CAISO, or in the event the CAISO no longer provides a forecast of Facility Energy for the Facility under the EIRP, then (ii) Seller or a Seller Affiliate, or if not Seller or a Seller Affiliate, a vendor selected by Seller for the purposes of providing or verifying the forecasts under Section 4.3(d) reasonably acceptable to Buyer, with such acceptance not to be unreasonably withheld, conditioned or delayed. “Auxin Anti-Circumvention Proceeding” means the DOC’s anti-circumvention investigation and proceeding concerning Crystalline Silicon Photovoltaic Cells, Whether or Not Assembled into Modules, from the People's Republic of China, Petition filed February 8, 2022 by Auxin Solar, Inc. in four separate DOC dockets: A-570-979 Malaysia; Thailand; Cambodia; and Vietnam.
3 “Available Generating Capacity” means the capacity of the Facility, expressed in whole MWs, that is mechanically available to generate Energy. “Bankrupt” means with respect to any entity, such entity that (a) files a petition or otherwise commences, authorizes or acquiesces in the commencement of a proceeding or cause of action under any bankruptcy, insolvency, reorganization or similar Law, (b) has any such petition filed or commenced against it which remains unstayed or undismissed for a period of ninety (90) days, (c) makes an assignment or any general arrangement for the benefit of creditors, (d) otherwise becomes bankrupt or insolvent (however evidenced), (e) has a liquidator, administrator, receiver, trustee, conservator or similar official appointed with respect to it or any substantial portion of its property or assets, or (f) is generally unable to pay its debts as they fall due. “Business Day” means any day except a Saturday, Sunday, or a Federal Reserve Bank holiday in California. A Business Day begins at 8:00 a.m. and ends at 5:00 p.m. local time for the Party sending a Notice, or payment, or performing a specified action. “Buyer” has the meaning set forth in the Cover Sheet.
“Buyer Bid Curtailment” means the occurrence of both of the following:
(a) the CAISO provides notice to a Party or the Scheduling Coordinator for the Facility, requiring the Party to deliver less Facility Energy than the full amount of Energy forecasted in accordance with Section 4.3(d) to be produced from the Facility for a period of time; and (b) for the same time period as referenced in (a), the notice referenced in (a) results from Buyer or the SC for the Facility, as the result of a Buyer instruction or lack of instruction to the SC:
(i) not having submitted a Self-Schedule or Energy Supply Bid for the MW subject to the reduction;
(ii) having submitted an Energy Supply Bid and the MW subject to the reduction were not awarded a schedule with respect to the Energy Supply Bid; or (iii) having submitted a Self-Schedule for less than the full amount of Energy forecasted to be generated by or delivered from the Facility in accordance with Section 4.3(d).
If the Facility is subject to a Planned Outage, Forced Facility Outage, Force Majeure Event and/or a Curtailment Period during the same time period as referenced in (a), then the calculation of Deemed Delivered Energy during such period shall not include any Facility Energy that was not generated due to such Planned Outage, Forced Facility Outage, Force Majeure Event, or Curtailment Order. For avoidance of doubt, if a Buyer Bid Curtailment and a CAISO system-wide overgeneration Curtailment Order occur in the same Settlement Interval or Settlement Period, the curtailment shall be treated as:
(i) a Buyer Bid Curtailment for the purpose of the calculation of Deemed Delivered Energy when there is a Negative LMP that is equal to or less than the Negative LMP Strike Price, or
4 (ii) a Curtailment Order for the purpose of the calculation of Deemed Delivery Energy when there is a Negative LMP that is greater than the Negative LMP Strike Price, subject to the following clarification, if Buyer or the SC (1) did not submit a Self-Schedule or Energy Supply Bid, or (2) failed to correctly submit or made an error with respect to a Self-Schedule or Energy Supply Bid, the curtailment shall be treated as a Buyer Bid Curtailment. “Buyer Curtailment Order” means an instruction from Buyer to Seller to reduce Energy from the Facility by the amount, and for the period of time set forth in such instruction (which for avoidance of doubt and without limiting the generality of the foregoing may include a Buyer instruction to reduce Energy when there is a Negative LMP that is equal to or less than the Negative LMP Strike Price), for reasons unrelated to Energy that was not generated due to a Planned Outage, Forced Facility Outage, Force Majeure Event and/or Curtailment Order. “Buyer Curtailment Period” means the period of time, as measured using current Settlement Intervals, during which Seller reduces Energy from the Facility pursuant to or as a result of (a) Buyer Bid Curtailment, (b) a Buyer Curtailment Order, or (c) any other action or omission by Buyer (or its agents) including a Buyer Default hereunder which directly causes Seller to be unable to deliver Facility Energy to the Delivery Point; provided, the duration of any Buyer Curtailment Period shall be inclusive of the time required for the Facility to ramp down and ramp up.
“Buyer Default” means a failure by Buyer (or its agents) to perform Buyer’s obligations hereunder, and includes an Event of Default of Buyer.
“Buyer’s WREGIS Account” has the meaning set forth in Section 4.7(a). “CAISO” means the California Independent System Operator Corporation or any successor entity performing similar functions.
“CAISO Approved Meter” means a CAISO approved revenue quality meter or meters, metering scheme, CAISO approved data processing gateway or remote intelligence gateway, telemetering equipment and data acquisition services, that comply with the CAISO Tariff, sufficient for monitoring, recording and reporting, in real time, all Facility Energy delivered to the Delivery Point.
“CAISO Grid” has the same meaning as “CAISO Controlled Grid” as defined in the CAISO Tariff.
“CAISO Metered Entity” has the meaning set forth in the CAISO Tariff. “CAISO Operating Order” means the Operating Instruction or Dispatch Instruction, as each are defined in the CAISO Tariff.
“CAISO Tariff” means the California Independent System Operator Corporation Agreement and Tariff, Business Practice Manuals (BPMs), and operating procedures, including the rules, protocols, procedures and standards attached thereto, as the same may be amended or modified from time-to-time and approved by FERC.
5 “California Renewables Portfolio Standard” or “California RPS Program” or “RPS” means the “California Renewables Portfolio Standard” program and policies established by California State Senate Bills 1038 (2002), 1078 (2002), 107 (2008), X-1 2 (2011), 350 (2015), and 100 (2018) as codified in, inter alia, California Public Utilities Code Sections 399.11 through 399.31 and California Public Resources Code Sections 25740 through 25751, as such provisions are amended or supplemented from time to time, including without limitation all applicable eligibility criteria and requirements thereof and implemented under the Enforcement Procedures for the Renewables Portfolio Standard for Local Publicly Owned Electric Utilities, as adopted by the CEC on December 22, 2020, and as may be amended from time to time. “Capacity Damages” has the meaning set forth in Exhibit B. “CEC” means the California Energy Commission, or any successor agency performing similar statutory functions.
“CEC Certification and Verification” means that the CEC has certified (or, with respect to periods before the date that is one hundred eighty (180) days following the Commercial Operation Date, that the CEC has pre-certified, as such date may be extended pursuant to Section 3.9) that the Facility is an Eligible Renewable Energy Resource for purposes of the California Renewables Portfolio Standard and that all Facility Energy delivered to the Delivery Point qualifies as generation from an Eligible Renewable Energy Resource. “CEC Precertification” means that the CEC has issued a precertification for the Facility indicating that the planned operations of the Facility would comply with applicable CEC requirements for CEC Certification and Verification.
“CEQA” means the California Environmental Quality Act, California Public Resources Code §§ 21000, et seq. and Chapter 3 of Division 6 of Title 14 of the California Code of Regulations.
“CEQA Completion Date” has the meaning set forth in Section 2.7(a). “CEQA Documents” means an initial study, categorical exemption negative declaration, environmental impact report or equivalent document (as applicable) relied upon by the lead agency in connection with the CEQA environmental review for the Facility, including but not limited to any addendum, supplement, or subsequent negative declaration or environmental impact report. “Change in Law” means the occurrence, after the Effective Date, of any of the following:
(a) the adoption or implementation of any Law; (b) any change in any Law or in the administration, interpretation or application of any Law by any Governmental Authority; (c) the making or issuance of any request, guideline or directive (whether or not having the force of law) by any Governmental Authority; (d) any change to a Resource Adequacy Ruling; (e) any order, decision, resolution, rule, regulation, guidance document, or other determination of the CEC or the CPUC or its Energy Division, (f) any change in the CAISO Tariff or any document included in the definition thereof whether or not approved by FERC, or (g) any change in STC REC-1, STC REC2 or STC 6. “Change of Control” means, except in connection with public market transactions of
6 equity interests or capital stock of Seller’s Ultimate Parent, any circumstance in which Ultimate Parent ceases to own, directly or indirectly through one or more intermediate entities, more than fifty percent (50%) of the outstanding equity interests in Seller; provided that in calculating ownership percentages for all purposes of the foregoing:
(a) any ownership interest in Seller held by Ultimate Parent indirectly through one or more intermediate entities shall not be counted towards Ultimate Parent’s ownership interest in Seller unless Ultimate Parent directly or indirectly owns more than fifty percent (50%) of the outstanding equity interests in each such intermediate entity; and (b) ownership interests in Seller owned directly or indirectly by any Lender (including any cash equity or tax equity provider) shall be excluded from the total outstanding equity interests in Seller;
provided further, a Change of Control shall not be deemed to have occurred as a result of a Permitted Transfer.
“COD Certificate” has the meaning set forth in Exhibit B. “Collateral Assignment Agreement” has the meaning set forth in Section 14.2. “Commercial Operation” has the meaning set forth in Exhibit B. “Commercial Operation Date” has the meaning set forth in Exhibit B. “Commercial Operation Delay Damages” means an amount equal to (a) the Development Security amount required hereunder, divided by (b) one-hundred and eighty (180). “Committed Unused Bank Line” means the total amount of (a) bank lines of credit committed to Buyer which are for Buyer’s general use or that are dedicated for Buyer’s use with respect to this Agreement (which for avoidance of doubt shall not include any amounts which qualify under the following subsection (b), i.e., no “double counting”), or (b) funds committed to Buyer as security deposits by Participating Members under the Third Phase Agreement, to the extent the amount of (a) and (b) are (1) available for Buyer’s unrestricted use, or (2) solely dedicated for use by Buyer under this Agreement. Without limiting the generality of the immediately preceding sentence, but for clarification purposes, the term Committed Unused Bank Line does not include any bank lines of credit committed to Buyer, or any other funds provided to Buyer, which are dedicated to any other specific purpose (i.e., any specific purpose other than Buyer’s use under this Agreement).
“Compliance Actions” has the meaning set forth in Section 3.9. “Compliance Costs” has the meaning set forth in Section 3.9. “Compliance Expenditure Cap” has the meaning set forth in Section 3.9. “Confidential Information” has the meaning set forth in Section 18.1.
7 “Construction Start” has the meaning set forth in Exhibit B. “Construction Start Date” has the meaning set forth in Exhibit B. “Contract Price” has the meaning set forth on the Cover Sheet. “Contract Term” has the meaning set forth in Section 2.1(a). “Contract Year” means a period of twelve (12) consecutive months. The first Contract Year shall commence on the Commercial Operation Date and each subsequent Contract Year shall commence on the anniversary of the Commercial Operation Date. “Construction Start Delay Damages” means an amount equal to (a) the Development Security amount required hereunder, divided by (b) one-hundred and eighty (180). “Costs” means, with respect to the Non-Defaulting Party, brokerage fees, commissions and other similar third-party transaction costs and expenses reasonably incurred by such Party either in terminating any arrangement pursuant to which it has hedged or financed its obligations or entering into new arrangements which replace this Agreement; and all reasonable attorneys’ fees and expenses incurred by the Non-Defaulting Party in connection with terminating this Agreement. “Cover Sheet” means the cover sheet to this Agreement, which is incorporated into this Agreement.
“COVID-19” means the epidemic disease designated COVID-19 and the related virus designated SARS-CoV-2, and any mutations thereof.
“CPUC” means the California Public Utilities Commission or any successor agency performing similar statutory functions.
“Credit Rating” means, with respect to an entity other than Buyer, the current rating then assigned to that entity’s unsecured, senior long-term debt obligations (not supported by third party credit enhancements), or if that entity does not have a rating for its senior unsecured long-term debt, then the rating then assigned to such entity as an issuer rating by S&P, Fitch or Moody’s.
With respect to Buyer, the long term issuer rating assigned by S&P, Moody’s, and Fitch. If Buyer does not have a long term issuer rating, then the highest rating assigned to Buyer’s revenue bonds (not supported by third party credit enhancements).
“Curtailment Order” means any of the following:
(a) CAISO orders, directs, alerts, or provides notice to a Party or the SC, including a CAISO Operating Order, to curtail deliveries of Facility Energy for the following reasons: (i) any System Emergency, or (ii) any warning of an anticipated System Emergency, or warning of an imminent condition or situation, which jeopardizes CAISO’s electric system integrity or the integrity of other systems to which CAISO is connected; (b) a curtailment ordered by the Participating Transmission Owner for reasons including, but not limited to, (i) any situation that affects normal function of the electric system
8 including, but not limited to, any abnormal condition that requires action to prevent circumstances such as equipment damage, loss of load, or abnormal voltage conditions, or (ii) any warning, forecast or anticipation of conditions or situations that jeopardize the Participating Transmission Owner’s electric system integrity or the integrity of other systems to which the Participating Transmission Owner is connected;
(c) a curtailment ordered by CAISO or the Participating Transmission Owner; or (d) a curtailment in accordance with Seller’s obligations under its Interconnection Agreement with the Participating Transmission Owner or distribution operator.
For clarification, any notice, order, or instruction from the CAISO to curtail or reduce Facility Energy and/or the Facility that results from a Buyer Bid Curtailment or a Buyer Curtailment Order is not a Curtailment Order.
“Curtailment Period” means the period of time, as measured using current Settlement Intervals, during which generation from the Facility is reduced pursuant to a Curtailment Order; provided, the Curtailment Period shall be inclusive of the time required for the Facility to ramp down and ramp up.
“Damage Payment” means the dollar amount that equals the amount of the Development Security less (i) any amounts paid by Seller including without limitation any Construction Start Delay Damages or Commercial Operation Delay Damages, and further less (ii) any amounts which Buyer has drawn from the Development Security.
“Day-Ahead Forecast” has the meaning set forth in Section 4.3(c). “Day-Ahead Schedule” has the meaning set forth in the CAISO Tariff. “Dedicated Interconnection Capacity” means the maximum instantaneous amount of Facility Energy that is permitted to be delivered to the Delivery Point under the Interconnection Agreement, in the amount of MWs as set forth on the Cover Sheet “Deemed Delivered Energy” means the amount of Energy expressed in MWh that the Facility would have produced and delivered to the Delivery Point, but that is not produced by the Facility during a Buyer Curtailment Period, which amount shall, for any time period, be equal to the difference between (a) the full amount of Energy forecasted to be produced by the Facility in accordance with Section 4.3(d) during a Buyer Curtailment Period, and any adjustments necessary to accurately reflect the Facility’s capacity to produce and deliver energy to the Delivery Point, including applicable losses and manufacturers’ applicable performance data, subject to Buyer’s verification not to be unreasonably withheld, minus (b) the amount of energy that the Facility produced and delivered to the Delivery Point during the Buyer Curtailment Period; provided that, if the applicable difference between the foregoing clauses (a) and (b) is negative, the Deemed Delivered Energy shall be zero (0). For the purpose of clarity, Deemed Delivered Energy does not include the amount of Energy expressed in MWh that the Facility would have produced and delivered to the Delivery Point, but that is not produced by the Facility during a Curtailment Period. “Defaulting Party” has the meaning set forth in Section 11.1(a).
9 “Deficient Month” has the meaning set forth in Section 4.7(e). “Delivery Point” has the meaning set forth in Exhibit A. “Delivery Term” shall mean the period of Contract Years set forth on the Cover Sheet beginning on the Commercial Operation Date, unless terminated earlier in accordance with the terms and conditions of this Agreement.
“Development Cure Period” has the meaning set forth in Exhibit B. “Development Security” means (a) cash or (b) a Letter of Credit in the amount set forth on the Cover Sheet.
“Disclosing Party” has the meaning set forth in Section 18.1. “DOC” means the U.S. Department of Commerce.
“Early Termination Date” has the meaning set forth in Section 11.2(a). “Effective Date” has the meaning set forth on the Preamble. “Electrical Losses” means all transmission or transformation losses between the Facility and the Delivery Point, calculated in accordance with CAISO approved methodologies applicable to revenue metering.
“Eligible Intermittent Resources Protocol” or “EIRP” means the Eligible Intermittent Resource Protocol, as may be amended from time to time, as set forth in the CAISO Tariff. “Eligible Renewable Energy Resource” has the meaning set forth in California Public Utilities Code Section 399.12(e) and California Public Resources Code Section 25741(a), as either code provision is amended or supplemented from time to time. “Energy” means electrical energy generated by the Facility. “Energy-Only Deliverability Status” has the meaning set forth in the CAISO Tariff. “Energy Supply Bid” has the meaning set forth in the CAISO Tariff. “Estoppel Certificate” has the meaning set forth in Section 14.2 and substantially in the form attached as Exhibit P.
“Event of Default” has the meaning set forth in Section 11.1. “Excess MWh” has the meaning set forth in Exhibit C.
“Executed Interconnection Agreement Milestone” means the date for completion of execution of the Interconnection Agreement by Seller (or Seller’s Affiliate) and the PTO as set forth on the Cover Sheet.
10 “Expected Energy” means the quantity of Energy that Seller expects to be able to deliver to Buyer from the Facility during each Contract Year or other time period in the quantity specified on the Cover Sheet.
“Facility” means the solar photovoltaic generating facility described on the Cover Sheet and in Exhibit A, located at the Site and including mechanical equipment and associated facilities and equipment (but excluding any Shared Facilities) required to deliver Energy to the Delivery Point.
“Facility Energy” means Energy delivered to the Delivery Point, net of Electrical Losses and Station Use, as measured by the Facility Meter, which Facility Meter will be adjusted in accordance with CAISO meter requirements and Prudent Operating Practices to account for Electrical Losses and Station Use.
“Facility Meter” means the CAISO Approved Meter that will measure all Facility Energy and is dedicated exclusively to the Facility.
“FERC” means the Federal Energy Regulatory Commission or any successor government agency.
“Fitch” means Fitch Ratings Ltd., or its successor.
“Force Majeure Event” has the meaning set forth in Section 10.1. “Forced Facility Outage” means an unexpected failure of one or more components of the Facility that prevents Seller from generating Energy or making Facility Energy available at the Delivery Point and that is not the result of a Force Majeure Event. For the purpose of clarity, a “Forced Facility Outage” is equivalent to a “Forced Outage” as such term is defined in the CAISO Tariff.
“Full Capacity Deliverability Status” has the meaning set forth in the CAISO Tariff. “Full Network Model” has the meaning set forth in the CAISO Tariff. “Future Environmental Attributes” shall mean, except to the extent set forth in the last sentence of this definition, any and all generation attributes (other than Green Attributes or Renewable Energy Incentives) which are newly recognized after the Effective Date under the RPS regulations or under any and all other international, federal, regional, state or other law, rule, regulation, bylaw, treaty or other intergovernmental compact, decision, administrative decision, program (including any voluntary compliance or membership program), competitive market or business method (including all credits, certificates, benefits, and emission measurements, reductions, offsets and allowances related thereto) that are attributable to the generation of electrical energy by the Facility and its displacement of conventional energy generation. Future Environmental Attributes do not include (i) any energy, capacity, reliability or other power attributes from the Facility, (ii) Renewable Energy Incentives including Tax Benefits including without limitation production tax credits or investment tax credits associated with the development, construction, operation or ownership of the Facility, or other financial incentives in the form of credits, reductions, or allowances associated with the Facility that are applicable to a
11 state or federal income taxation obligation, (iii) fuel-related subsidies or “tipping fees” that may be paid to Seller to accept certain fuels, or local subsidies received by the generator for the destruction of particular preexisting pollutants or the promotion of local environmental benefits, or (iv) emission reduction credits encumbered or used by the Facility for compliance with local, state, or federal operating and/or air quality permits. “Gains” means, with respect to any Non-Defaulting Party, an amount equal to the present value of the economic benefit to it, if any (exclusive of Costs), resulting from the termination of this Agreement for the remaining Contract Term, determined in a commercially reasonable manner. Factors used in determining the economic benefit to a Non-Defaulting Party may include, without limitation, reference to information supplied by one or more third parties, which shall exclude Affiliates of the Non-Defaulting Party, including without limitation, quotations (either firm or indicative) of relevant rates, prices, yields, yield curves, volatilities, spreads or other relevant market data in the relevant markets, comparable transactions, forward price curves based on economic analysis of the relevant markets, settlement prices for comparable transactions at liquid trading hubs (e.g., SP-15), all of which should be calculated for the remaining Contract Term, and include the value of Green Attributes.
“Governmental Authority” means any federal, state, provincial, local or municipal government, any political subdivision thereof or any other governmental, congressional or parliamentary, regulatory, or judicial instrumentality, authority, body, agency, department, bureau, or entity with authority to bind a Party at law, including CAISO; provided, however, that “Governmental Authority” shall not in any event include any Party, and in Buyer’s case, its Participating Members as well.
“Green Attributes” means any and all credits, benefits, emissions reductions, offsets, and allowances, howsoever entitled, attributable to the generation from the Facility, and its avoided emission of pollutants and displacement of conventional energy generation. Green Attributes include but are not limited to PCC1 Renewable Energy Credits, as well as: (1) any avoided emission of pollutants to the air, soil or water such as sulfur oxides (SOx), nitrogen oxides (NOx), carbon monoxide (CO) and other pollutants; (2) any avoided emissions of carbon dioxide (CO2), methane (CH4), nitrous oxide, hydrofluorocarbons, perfluorocarbons, sulfur hexafluoride and other greenhouse gases (GHGs) that have been determined by the United Nations Intergovernmental Panel on Climate Change, or otherwise by law, to contribute to the actual or potential threat of altering the Earth’s climate by trapping heat in the atmosphere; (3) the reporting rights to these avoided emissions, such as PCC1 Renewable Energy Credits or Green Tag Reporting Rights. Green Tags and PCC1 Renewable Energy Credits are accumulated on a MWh basis and one Green Tag or PCC 1 Renewable Energy Credit represents the Green Attributes associated with one (1) MWh of Energy. Green Attributes as defined herein are limited to Green Attributes that exist under applicable Law as of the Effective Date. Green Attributes do not include (i) any energy, capacity, reliability or other power attributes from the Facility, (ii) Renewable Energy Incentives including Tax Benefits including without limitation production tax credits or investment tax credits associated with the development, construction, operation or ownership of the Facility and other financial incentives in the form of credits, reductions, or allowances associated with the Facility that are applicable to a state or federal income taxation obligation, (iii) fuel-related subsidies or “tipping fees” that may be paid to Seller to accept certain fuels, or local subsidies received by the generator for the destruction of particular preexisting pollutants or the
12 promotion of local environmental benefits, or (iv) emission reduction credits encumbered or used by the Facility for compliance with local, state, or federal operating or air quality permits. “Green Tag Purchaser” means Buyer.
“Green Tag Reporting Rights” means the right of a Green Tag Purchaser to report the ownership of accumulated Green Tags in compliance with federal or state law, if applicable, and to a federal or state agency or any other party at the Green Tag Purchaser’s discretion, and include without limitation those Green Tag Reporting Rights accruing under Section 16.5(b) of The Energy Policy Act of 1992 and any present or future federal, state, or local law, regulation or bill, and international or foreign emission trading program, including pursuant to the WREGIS Operating Rules.
“Guaranteed Capacity” means the amount of generating capacity of the Facility, as measured in MWAC at the Delivery Point (i.e., measured at the Facility Meter as such meter readings at the Facility Meter are adjusted by the CAISO for any applicable Electrical Losses and Station Use to the extent such Electrical Losses and Station Use are not already reflected in the Facility Meter measurements), set forth on the Cover Sheet, as the same may be adjusted pursuant to Section 5 of Exhibit B.
“Guaranteed Commercial Operation Date” has the meaning set forth on the Cover Sheet, subject to extension pursuant to Exhibit B.
“Guaranteed Construction Start Date” has the meaning set forth on the Cover Sheet, subject to extension pursuant to Exhibit B.
“Guaranteed Energy Production” means an amount of Adjusted Energy Production equal to eighty percent (80%) of the Expected Energy for the applicable Performance Measurement Period.
“Guarantor” means, with respect to Seller, (a) NextEra Energy Capital Holdings, Inc., (b) an Affiliate of Seller with an Investment Grade Credit Rating, or (c) any Person reasonably acceptable to Buyer, that (i) has an Investment Grade Credit Rating, (ii) has a tangible net worth of at least One Hundred Fifty Million Dollars ($150,000,000), (iii) is incorporated or organized in a jurisdiction of the United States and is in good standing in such jurisdiction, and (iv) executes and delivers a Guaranty for the benefit of Buyer.
“Guaranty” means a guaranty from a Guarantor provided for the benefit of Buyer substantially in the form attached as Exhibit L.
“Imbalance Energy” means the amount of energy in MWh, in any given Settlement Period or Settlement Interval, by which the amount of Facility Energy deviates from the amount of Scheduled Energy.
“Independent Report” has the meaning set forth in Section 2.5(b). “Initial Synchronization” means the initial delivery of Facility Energy to the Delivery Point.
13 “Installed Capacity” means the actual generating capacity of the Facility, as measured in MWAC at the Delivery Point, that achieves Commercial Operation, as evidenced by a certificate substantially in the form attached as Exhibit I hereto; provided, the Installed Capacity may not exceed the Guaranteed Capacity.
“Interconnection Agreement” means the interconnection agreement(s) entered into by Seller or Seller’s Affiliate pursuant to which the Facility will be interconnected with the Transmission System, and pursuant to which Seller’s Interconnection Facilities and any other Interconnection Facilities will be constructed, operated and maintained during the Contract Term. “Interconnection Facilities” means the interconnection facilities, control and protective devices and metering facilities required to connect the Facility with the Transmission System in accordance with the Interconnection Agreement.
“Interest Rate” has the meaning set forth in Section 8.2. “Inter-SC Trade” or “IST” has the meaning set forth in the CAISO Tariff. “Interim Deliverability Status” has the meaning set forth in the CAISO Tariff. “Investment Grade Credit Rating” means a Credit Rating of at least BBB- from S&P, BBB- from Fitch, or Baa3 from Moody’s. If ratings by S&P, Fitch, and Moody’s are not equivalent, the highest two ratings shall apply. For avoidance of doubt, a Credit Rating from more than one credit agency is not necessary for a Party to demonstrate an Investment Grade Credit Rating.
“ITC” means the investment tax credit established pursuant to Section 48, 48E or other applicable provisions of the United States Internal Revenue Code of 1986, as in effect from timeto-time throughout the Contract Term or any successor provision. “Joint Powers Act” means the provisions of the California Joint Exercise of Powers Act found in Chapter 5 of Division 7 of Title 1 of the Government Code of the State of California, beginning at California Government Code Section 6500, et seq. “Joint Powers Agreement” means the Amended and Restated Northern California Power Agency Joint Exercise of Power Agreement dated as of January 31, 2008, as such agreement may be further amended or amended and restated from time to time, under which Buyer is organized as a Joint Powers Agency in accordance with the Joint Powers Act. “Law” means any applicable law, statute, rule, regulation, decision, writ, order, decree or judgment, permit or any interpretation thereof, promulgated or issued by a Governmental Authority.
“Lead Agency” means the public agency with the principal responsibility for approving the Facility or relevant portion thereof as defined pursuant to CEQA, 14 C.C.R. § 15367. “Lender” means, collectively, any Person (a) providing senior or subordinated construction, interim, back leverage, mezzanine, or long-term debt, equity, or tax equity financing
14 or refinancing for or in connection with the development, construction, purchase, installation, or operation of the Facility, whether that financing or refinancing takes the form of private debt (including back-leverage debt), equity (including cash or tax equity), public debt, or any other form (including financing or refinancing provided to a member or other direct or indirect owner of Seller), including any equity or tax equity investor directly or indirectly providing financing or refinancing for the Facility or purchasing equity ownership interests of Seller and/or its Affiliates, and any trustee or agent or similar representative acting on their behalf, (b) providing interest rate or commodity protection under an agreement hedging or otherwise mitigating the cost of any of the foregoing obligations, (c) participating in a lease financing (including a sale leaseback or leveraged leasing structure) with respect to the Facility, or (d) acting as issuing bank for any Letter(s) of Credit issued pursuant hereto or in connection with the Facility. “Letter(s) of Credit” means one or more irrevocable, standby letters of credit, issued by an Acceptable Issuer, in a form substantially similar to the letter of credit set forth in (a) Exhibit K if issued on behalf of Seller for the benefit of Buyer, and (b) Exhibit Q if issued on behalf of Buyer for the benefit of Seller, each as applicable.
“Licensed Professional Engineer” means an independent, professional engineer selected by Seller and reasonably acceptable to Buyer, licensed in the State of California. “Locational Marginal Price” or “LMP” has the meaning set forth in the CAISO Tariff. “Losses” means, with respect to the Non-Defaulting Party, an amount equal to the present value of the economic loss to it, if any (exclusive of Costs), resulting from termination of this Agreement for the remaining Contract Term, determined in a commercially reasonable manner.
Factors used in determining economic loss to a Non-Defaulting Party may include, without limitation, reference to information supplied by one or more third parties, which shall exclude Affiliates of the Non-Defaulting Party, including without limitation, quotations (either firm or indicative) of relevant rates, prices, yields, yield curves, volatilities, spreads or other relevant market data in the relevant markets, comparable transactions, forward price curves based on economic analysis of the relevant markets, settlement prices for comparable transactions at liquid trading hubs (e.g., SP-15), all of which should be calculated for the remaining Contract Term, as applicable, and must include the value of Green Attributes and Renewable Energy Incentives. “Lost Output” has the meaning set forth in Section 4.6. “Major Project Development Milestone” has the meaning set forth in in Exhibit B. “Master File” has the meaning set forth in the CAISO Tariff. “Meter Service Agreement for Metered Entities” or “MSA” has the meaning set forth in the CAISO Tariff.
“Milestones” means the development activities for significant interconnection and construction milestones set forth on the Cover Sheet.
“Monthly Delivery Forecast” has the meaning set forth in Section 4.3(b).
15 “Moody’s” means Moody’s Investors Service, Inc., or its successor. “MW” means megawatts in alternating current, unless expressly stated in terms of direct current.
“MWh” means megawatt-hour measured in alternating current, unless expressly stated in terms of direct current.
“NEECH” has the meaning set forth in the definition of Affiliate. “NEER” means NextEra Energy Resources, LLC.
“Negative LMP” means, in any Settlement Period or Settlement Interval, the Day-Ahead Market or Real-Time Market at the Facility’s PNode is less than Zero dollars ($0). “Negative LMP Strike Price” means zero dollars per MWh ($0/MWh), as such price may be revised by Buyer at its sole discretion (provided the revised price is less than or equal to Zero dollars ($0)) by providing Notice to Seller in accordance with Exhibit C. “NEOP” has the meaning set forth in the definition of Affiliate. “NEP” has the meaning set forth in the definition of Affiliate. “NERC” means the North American Electric Reliability Corporation or any successor entity performing similar functions.
“Network Upgrades” has the meaning set forth in the CAISO Tariff. “New PV Trade Measure Event” means any of the following events, during the period while the applicable ruling request, inquiry, rulemaking, or other filing or proceeding remains pending or subject to appeal before the DOC or other applicable Governmental Authority:
i. Filing of any anti-circumvention ruling request alleging that manufacturers or importers are circumventing any AD/CVD orders on PV Equipment; ii. Initiation of any anti-circumvention inquiry into whether manufacturers or importers are circumventing any AD/CVD orders on PV Equipment or issuance in any such inquiry of any finding or ruling that manufacturers or importers are circumventing any AD/CVD orders on PV Equipment; or
iii. Filing or initiation of any rulemakings, adjudications, or other proceedings or actions to increase, extend, or expand application of, or impose any new, tariffs, duties (including but not limited to AD/CVD), or other trade measures, or issuance of any related determinations, orders, tariffs, duties, or trade measures, on PV Equipment.
For the avoidance of doubt, the Parties acknowledge that any of the following shall trigger the occurrence of a New PV Trade Measure Event with respect to the Auxin Anti-Circumvention Proceeding: (a) any legislative, judicial, or administrative challenge to, or withdrawal (in whole
16 or in part) of, (I) that certain Declaration of Emergency and Authorization for Temporary Extensions of Time and Duty-Free Importation of Solar Cells and Modules from Southeast Asia, by the President of the United States, dated June 6, 2022, or supporting Presidential Determination Pursuant to Section 303 of the Defense Production Act, or (II) any implementation thereof by the DOC or other Governmental Authority, including through any rulemaking; or (b) any legislative, judicial, or administrative challenge that seeks to expand the scope of the DOC’s final affirmative circumvention determinations, as published on August 23, 2023 in 88 Fed. Reg. 57,419, to cover companies or activities excluded in such final affirmative determinations, or to narrow the scope of, or vacate or reverse, any negative circumvention determinations or guidance on avoiding circumvention in such published issuance. The Parties further acknowledge that the AASMTC AD/CVD Case constitutes a New PV Trade Measure Event.
“Non-Defaulting Party” has the meaning set forth in Section 11.2. “Notice” shall, unless otherwise specified in this Agreement, mean written communications by a Party to be delivered by hand delivery, United States mail, next Business Day courier service, or electronic messaging (e-mail).
“Participating Generator Agreement” has the meaning set forth in the CAISO Tariff. “Participating Member” means a member of Buyer that is signatory to the Third Phase Agreement. As of the Effective Date, such Participating Members are _________; if the Participating Members change after the Effective Date, Buyer shall provide written notice to Seller confirming the then-current list of Participating Members that are signatory to the Third Phase Agreement, and such written notice shall not be considered to be an amendment to this Agreement. “Participating Transmission Owner” or “PTO” means an entity that owns, operates and maintains transmission or distribution lines and associated facilities or has entitlements to use certain transmission or distribution lines and associated facilities where the Facility is interconnected. For purposes of this Agreement, the Participating Transmission Owner is set forth in Exhibit A.
“Party” or “Parties” has the meaning set forth in the Preamble. “Performance Measurement Period” means each two (2) consecutive Contract Year periods during the Delivery Term, calculated on a non-rolling basis such that no Contract Year is included in more than one Performance Measurement Period. The first Performance Measurement Period shall include Contract Years 1 and 2. The second Performance Measurement Period shall be comprised of Contract Years 3 and 4, and so on.
“Performance Security” means (a) cash or (b) a Letter of Credit or (c) a Guaranty in the amount set forth on the Cover Sheet.
“Permitted Transfer” means each of the following transactions:
(a) Transactions among Affiliates of Seller, including any corporate reorganization, merger, combination or similar transaction or transfer of assets or ownership interests involving Seller or its Affiliates; provided (i)(A) Ultimate Parent retains the authority, directly or indirectly,
17 to control the entity that is the Seller after such transactions, or (B) a wholly-owned, indirect subsidiary of Ultimate Parent operates the Facility, and (ii) if such transactions transfer this Agreement to any entity other than the entity that is the Seller before such transactions (including transfers by operation of law pursuant to transactions in which Seller is not the surviving entity), the transferee (A) executes and delivers to Buyer a written agreement under which the transferee assumes in writing all of Seller’s duties and obligations under this Agreement and otherwise agrees to be bound by all of the terms and conditions of this Agreement, and (B) satisfies the Seller Development Security requirements and Performance Security requirements; (b) A Change of Control of Ultimate Parent;
(c) Any change of economic and voting rights triggered in Seller’s organization documents arising from the financing of the Facility and that does not result in the transfer of ownership, economic or voting rights in any entity that had no such rights immediately prior to the change;
(d) The direct or indirect transfer of shares of, or equity interests in, Seller to a Lender; (e) An assignment of the Agreement, or the transfer of the Facility or the direct or indirect ownership of equity interests in Seller, to a Permitted Transferee; or (f) A transfer of the Facility (or the direct or indirect ownership of equity interests in Seller) in connection with any of the following transfers: (i) all or substantially all of the assets of NEER, NEECH, or Ultimate Parent; (ii) all or substantially all of NEER’s or Ultimate Parent’s renewable energy generation portfolio; or (iii) all or substantially all of NEER’s or Ultimate Parent’s solar generation and/or energy storage portfolio; or (iv) the direct or indirect transfer of shares of, or equity interests in, Seller to a person in which, following the transfer, an Affiliate of NEER continues to hold an economic interest in the Facility; provided, that in the case of each of (i) through (iv) above: (A) the transferee (1) executes and delivers to Buyer a written agreement under which the transferee assumes in writing all of Seller’s duties and obligations under this Agreement and otherwise agrees to be bound by all of the terms and conditions of this Agreement, and (2) meets the Seller credit security requirements; and (B) the entity that operates the Facility following such transfer is (or contracts with) a Qualified Operator. “Permitted Transferee” means (a) any Affiliate of Seller, or (b) any entity that satisfies, or is controlled by another Person that satisfies, the following requirements:
(i) A Tangible Net Worth of not less than One Hundred Fifty Million Dollars ($150,000,000) or a Credit Rating of at least BBB- from S&P, BBB- from Fitch, or Baa3 from Moody’s; and
(ii) At least two (2) years of experience in the ownership and operations of power generation facilities similar to the Facility, or has retained a third-party with such experience to operate the Facility.
Notwithstanding the foregoing, with respect to Seller, Permitted Transferee shall include its Ultimate Parent, NEER, NEECH, NEOP, and NEP, and their respective direct or indirect subsidiaries.
18 “Person” means any individual, sole proprietorship, corporation, limited liability company, limited or general partnership, joint venture, association, joint-stock company, trust, incorporated organization, institution, public benefit corporation, unincorporated organization, government entity or other entity.
“Planned Outage” means a period during which the Facility is either in whole or in part not capable of providing service due to planned maintenance that has been scheduled in advance in accordance with Section 4.5(a). For the purpose of clarity, a “Planned Outage” is equivalent to a “Planned Outage” as such term is defined in the CAISO Tariff. “PNode” has the meaning set forth in the CAISO Tariff.
“Portfolio” means the single portfolio of electrical energy generating, energy storage, or other assets and entities, including the Facility (or the interests of Seller or Seller’s Affiliates or the interests of their respective direct or indirect parent companies), that entails assets in the United States, that is pledged as collateral security in connection with a Portfolio Financing. “Portfolio Content Category” means PCC1, PCC2 or PCC3, as applicable. “Portfolio Content Category 1” or “PCC1” means any Renewable Energy Credit associated with the generation of electricity from an Eligible Renewable Energy Resource consisting of the portfolio content set forth in California Public Utilities Code Section 399.16(b)(1), as may be amended from time to time or as further defined or supplemented by Law.
“Portfolio Financing” means any equity (including tax equity) financings or debt transactions entered into by an Affiliate of Seller that is secured only by a Portfolio. “Portfolio Financing Entity” means any Affiliate of Seller that enters into a tax equity transaction or incurs debt in connection with any Portfolio Financing. “Product” has the meaning set forth on the Cover Sheet. For the purpose of clarity, Product shall include (i) Facility Energy, and (ii) Green Attributes, including, but not limited to, Portfolio Content Category 1 Renewable Energy Credits (in each case not to exceed the quantity of Facility Energy and associated Green Attributes available from the Installed Capacity). “Progress Report” means a progress report including the items set forth in Exhibit E. “Proposed Contract Price Increase” has the meaning set forth in Section 2.5(b). “Prudent Operating Practice” means (a) the applicable practices, methods and acts required by or consistent with applicable Laws and reliability criteria, and otherwise engaged in or approved by a significant portion of the electric utility and independent power producer industry during the relevant time period with respect to grid-interconnected, utility-scale generating facilities in the Western United States, or (b) any of the practices, methods and acts which, in the exercise of reasonable judgment in light of the facts known at the time the decision was made, could have been expected to accomplish the desired result at a reasonable cost consistent with good business practices, reliability, safety and expedition. Prudent Operating Practice is not
19 intended to be limited to the optimum practice, method or act to the exclusion of all others, but rather to acceptable practices, methods or acts generally accepted in the industry with respect to grid-interconnected, utility-scale generating facilities in the Western United States. Prudent Operating Practice includes compliance with applicable Laws, applicable reliability criteria, and the applicable criteria, rules and standards promulgated in the National Electric Safety Code and the National Electrical Code, as they may be amended or superseded from time to time, including the criteria, rules and standards of any successor organizations. “PTC” means the production tax credit established pursuant to Section 45 or 45Y or other applicable provisions of the United States Internal Revenue Code of 1986, as in effect as of the Commercial Operation Date, adjusted for inflation during the period any such PTCs are received as permitted under such applicable provisions of the United States Internal Revenue Code as of the Commercial Operation Date.
“PTC Amount” means the amount, on a dollar per MWh basis, equal to the PTCs that Seller would have earned in respect of Facility Energy at the time, grossed up on an After-Tax Basis at the then-highest marginal combined federal and state corporate tax rate, but failed to earn as a result of Buyer Bid Curtailment, Buyer Curtailment Order, or any other action or omission by Buyer (or its agents) including a Buyer Default which causes Seller to be unable to deliver Facility Energy to the Delivery Point, with the applicable MWh figure to be calculated by reference to the amount of Deemed Delivered Energy; provided, however the PTC Amount shall not be greater than $40.00 per MWh as of the Commercial Operation Date, and as subsequently adjusted for inflation during the period any such PTC Amounts are received by Seller, where the period of time any such PTC Amounts are received by Seller shall not exceed a total period of 10 years. “PV Equipment” means solar photovoltaic cells, modules, onboard sensors, control components, inverters, or any of their components.
“Qualified Operator” means Seller (either itself or through the engagement of an Affiliate) or an operator of photovoltaic solar generation facilities that has sufficient experience and technical capability to perform for Seller’s benefit the obligations of Seller under this Agreement related to the operation and maintenance of the Facility in accordance with the applicable requirements of this Agreement, as evidenced by such operator having operated two (2) or more photovoltaic solar generation facilities, each having a nameplate capacity rating of twenty (20) MW or more, for not less than two (2) years.
“Qualified Reporting Entity” or “QRE” has the meaning set forth in the WREGIS Operating Rules.
“Real-Time Forecast” has the meaning set forth in Section 4.3(d). “Real-Time Market” has the meaning set forth in the CAISO Tariff. “Real-Time Price” means the Resource-Specific Settlement Interval LMP as defined in the CAISO Tariff. If there is more than one applicable Real-Time Price for the same period of time, Real-Time Price shall mean the price associated with the smallest time interval. “Receiving Party” has the meaning set forth in Section 18.1.
20 “Recurring Certificate Transfer” has the meaning set forth in Section 4.7(a). “Remedial Action Plan” has the meaning set forth in Section 2.4. “Renewable Energy Credit” or “REC” means a renewable energy credit as defined by and in accordance with Section 399.12(h) of the California Public Utilities Code, including the right to claim title to the Green Attributes attributable to the generation of electric generation from an Eligible Renewable Energy Resources, as may be amended from time to time or as further defined or supplemented by Law.
“Renewable Energy Incentives” means: (a) all federal, state, or local Tax credits or other Tax benefits associated with the production of electricity from, or the construction, operation or the ownership of, the Facility or any part thereof (including the Tax Benefits and other credits under Sections 38, 45, 45Y, 46, 48, and 48E of the Internal Revenue Code of 1986, as amended); (b) any federal, state, or local grants, subsidies or other like benefits relating in any way to the Facility, including a cash grant available under Section 1603 of Division B of the American Recovery and Reinvestment Act of 2009, in lieu of federal Tax credits or any similar or substitute payment available under subsequently enacted federal legislation; and (c) any other form of incentive relating in any way to the Facility that is not a Green Attribute, or Future Environmental Attribute.
“S&P” means the Standard & Poor’s Financial Services, LLC (a subsidiary of S&P Global Inc.) or its successor.
“Schedule” has the meaning set forth in the CAISO Tariff, and “Scheduled” has a corollary meaning.
“Scheduled Energy” means the Facility Energy that clears under the applicable CAISO market based on the final Day-Ahead Schedule, FMM Schedule (as defined in the CAISO Tariff), or any other financially binding Schedule, market instruction or dispatch for the Facility for a given period of time implemented in accordance with the CAISO Tariff. “Scheduling Coordinator” or “SC” means an entity certified by the CAISO as qualifying as a Scheduling Coordinator pursuant to the CAISO Tariff for the purposes of undertaking the functions specified in “Responsibilities of a Scheduling Coordinator,” of the CAISO Tariff, as amended from time to time.
“Scheduling Coordinator Metered Entity” has the meaning set forth in the CAISO Tariff.
“Security Interest” has the meaning set forth in Section 8.10. “Self-Schedule” has the meaning set forth in the CAISO Tariff. “Seller” has the meaning set forth on the Cover Sheet.
“Seller’s WREGIS Account” has the meaning set forth in Section 4.7(a).
21 “Settlement Amount” means the Non-Defaulting Party’s Costs and Losses, on the one hand, netted against its Gains, on the other. If the Non-Defaulting Party’s Costs and Losses exceed its Gains, then the Settlement Amount shall be an amount owing to the Non-Defaulting Party. If the Non-Defaulting Party’s Gains exceed its Costs and Losses, then the Settlement Amount shall be zero dollars ($0). The Settlement Amount does not include consequential, incidental, punitive, exemplary or indirect or business interruption damages; provided, that the Parties agree that the value of Green Attributes and Renewable Energy Incentives are direct damages to be accounted for as specified in the definitions of Losses and Gains. “Settlement Interval” has the meaning set forth in the CAISO Tariff. “Settlement Period” has the meaning set forth in the CAISO Tariff. “Settlement Quality Meter Data” has the meaning set forth in the CAISO Tariff. “Shared Facilities” means the gen-tie lines, transformers, substations, or other equipment, permits, contract rights, and other assets and property (real or personal), in each case, as necessary to enable delivery of Energy from the Facility (which is excluded from Shared Facilities) to the point of interconnection, including the Interconnection Agreement itself, that are used in common with Affiliates and/or other third parties or by Seller for electric generation or storage facilities owned by Seller other than the Facility.
“Site” means the real property on which the Facility is or will be located, as further described in Exhibit A and as shall be updated by Seller at the time Seller provides an executed Construction Start Date certificate in the form of Exhibit J to Buyer. “Site Control” means that Seller or its Affiliate for the Delivery Term: (a) owns or has the option to purchase the Site; (b) is the lessee or has the option to lease the Site; or (c) is the holder of an easement or an option for an easement, right-of-way grant, or similar instrument with respect to the Site.
“SP-15” means the Existing Zone Generation Trading Hub for Existing Zone region SP15 as set forth in the CAISO Tariff.
“SQMD Plan” has the meaning set forth in the CAISO Tariff. “Station Use” means:
(a) The Energy generated by the Facility that is used within the Facility to power the lights, motors, control systems and other electrical loads that are necessary for operation of the Facility; and
(b) The Energy generated by the Facility that is consumed within the Facility’s electric energy distribution system as losses.
For the purpose of clarity Seller shall not use Energy generated by the Facility to charge a battery energy storage system and claim such as Station Use.
22 “System Emergency” means any condition that requires, as determined and declared by CAISO or the PTO, automatic or immediate action to (a) prevent or limit harm to or loss of life or property, (b) prevent loss of transmission facilities or generation supply in the immediate vicinity of the Facility, or (c) to preserve Transmission System reliability. “Tangible Net Worth” means the tangible assets (for example, not including intangibles such as goodwill and rights to patents or royalties) that remain after deducting liabilities as determined in accordance with generally accepted accounting principles. “Tax” or “Taxes” means all U.S. federal, state and local and any foreign taxes, levies, assessments, surcharges, duties and other fees and charges of any nature imposed by a Governmental Authority, whether currently in effect or adopted during the Contract Term, including ad valorem, excise, franchise, gross receipts, import/export, license, property, sales and use, stamp, transfer, payroll, unemployment, income, and any and all items of withholding, deficiency, penalty, additions, interest or assessment related thereto. “Tax Benefits” means the PTC, ITC, and any other state, local and/or federal tax benefit or incentive, including energy credits determined under Sections 38, 45, 45Y, 46, 48 and 48E of the Internal Revenue Code of 1986, as amended, investment tax credits, production tax credits, depreciation, amortization, deduction, expense, exemption, preferential rate, and/or other tax benefit or incentive associated with the production, sale, or storage of renewable energy and/or the operation, construction, investments in or ownership of, the Facility (including any cash payment or grant).
“Terminated Transaction” has the meaning set forth in Section 11.2(a). “Termination Payment” has the meaning set forth in Section 11.3. “Test Energy” means Facility Energy delivered (a) commencing on the later of (i) the first date that the CAISO informs Seller in writing that Seller may deliver Energy to the CAISO and (ii) the first date that the PTO informs Seller in writing that Seller has conditional or temporary permission to parallel and (b) ending upon the occurrence of the Commercial Operation Date. “Test Energy Rate” has the meaning set forth in Section 3.6. “Third Phase Agreement” means the agreement between Buyer and the Participating Members that sets forth the terms and conditions under which Buyer is authorized to enter into this Agreement on behalf of the Participating Members.
“TP Deliverability” has the meaning set forth in the CAISO Tariff. “Transmission Provider” means any entity or entities transmitting or transporting the Facility Energy on behalf of Buyer from the Delivery Point. “Transmission System” means the transmission facilities operated by the CAISO, now or hereafter in existence, which provide energy transmission service downstream from the Delivery Point.
23 “UFLPA/WRO Restraint” means any withhold release order or other import restraint issued by U.S. Customs and Border Protection or other applicable Governmental Authority, including under the Uyghur Forced Labor Prevention Act, that prevents or delays the import or release of any PV Equipment into the United States and such order, despite the use by Seller of commercially reasonable efforts to avoid procurement or sourcing of PV Equipment that was reasonably foreseeable to become subject to such restraint, prevents or delays the delivery of such PV Equipment to Seller for incorporation into the Facility. “Ultimate Parent” means NextEra Energy, Inc., NEER, NEP, NEOP, or NEECH, and includes any combination thereof.
“Variable Energy Resource” or “VER” has the meaning set forth in the CAISO Tariff. “WREGIS” means the Western Renewable Energy Generation Information System or any successor renewable energy tracking program.
“WREGIS Certificate Deficit” has the meaning set forth in Section 4.7(e). “WREGIS Certificates” has the same meaning as “Certificate” as defined by WREGIS in the WREGIS Operating Rules and are designated as eligible for complying with the California Renewables Portfolio Standard.
“WREGIS Operating Rules” means those operating rules and requirements adopted by WREGIS as of October 1, 2022, as subsequently amended, supplemented or replaced (in whole or in part) from time to time.
1.2 Rules of Interpretation. In this Agreement, except as expressly stated otherwise or unless the context otherwise requires:
(a) headings and the rendering of text in bold and italics are for convenience and reference purposes only and do not affect the meaning or interpretation of this Agreement; (b) words importing the singular include the plural and vice versa and the masculine, feminine and neuter genders include all genders; (c) the words “hereof”, “herein”, and “hereunder” and words of similar import shall refer to this Agreement as a whole and not to any particular provision of this Agreement; (d) a reference to an Article, Section, paragraph, clause, Party, or Exhibit is a reference to that Article, Section, paragraph, clause of, or that Party or Exhibit to, this Agreement unless otherwise specified;
(e) a reference to a document or agreement, including this Agreement means such document, agreement or this Agreement including any amendment or supplement to, or replacement, novation or modification of this Agreement, but disregarding any amendment, supplement, replacement, novation or modification made in breach of such document, agreement or this Agreement;
24 (f) a reference to a Person includes that Person’s successors and permitted assigns;
(g) the terms “include” and “including” mean “include or including (as applicable) without limitation” and any list of examples following such terms shall in no way restrict or limit the generality of the word or provision in respect of which such examples are provided;
(h) references to any statute, code or statutory provision are to be construed as a reference to the same as it may have been, or may from time to time be, amended, modified or reenacted, and include references to all bylaws, instruments, orders and regulations for the time being made thereunder or deriving validity therefrom unless the context otherwise requires; (i) in the event of a conflict, a mathematical formula or other precise description of a concept or a term shall prevail over words providing a more general description of a concept or a term;
(j) references to any amount of money shall mean a reference to the amount in United States Dollars;
(k) the expression “and/or” when used as a conjunction shall connote “any or all of”;
(l) words, phrases or expressions not otherwise defined herein that (i) have a generally accepted meaning in Prudent Operating Practice shall have such meaning in this Agreement or (ii) do not have well known and generally accepted meaning in Prudent Operating Practice but that have well known and generally accepted technical or trade meanings, shall have such recognized meanings; and
(m) each Party acknowledges that it was represented by counsel in connection with this Agreement and that it or its counsel reviewed this Agreement and that any rule of construction to the effect that ambiguities are to be resolved against the drafting Party shall not be employed in the interpretation of this Agreement.
ARTICLE 2
TERM; CONDITIONS PRECEDENT
2.1 Contract Term.
(a) The term of this Agreement shall commence on the Effective Date and shall remain in full force and effect until the conclusion of the Delivery Term, subject to any early termination provisions set forth herein (“Contract Term”); provided, however, that subject to Buyer’s obligations in Section 3.6, Buyer’s obligations to pay for or accept any Product are subject to Seller’s completion of the conditions precedent pursuant to Section 2.2. (b) Applicable provisions of this Agreement shall continue in effect after termination, including early termination, to the extent necessary to enforce or complete the duties, obligations or responsibilities of the Parties arising prior to termination. The indemnity and audit
25 rights shall remain in full force and effect for one (1) year following the termination of this Agreement. The confidentiality obligations of the Parties under Article 18 shall remain in full force and effect for two (2) years following the termination of this Agreement.
2.2 Conditions Precedent. The Delivery Term shall commence upon Seller’s completion of all of the following conditions:
(a) Seller shall have constructed or caused to be constructed the Facility as of the Commercial Operation Date to (i) enable Seller to satisfy the obligations of the Seller under this Agreement subject to Exhibit B, Section 5, and (ii) enable the Facility to provide Product; (b) The Facility has successfully completed all testing required by Prudent Operating Practice or any requirement of Law to operate the Facility; (c) Seller has delivered to Buyer (i) a completion certificate from a Licensed Professional Engineer substantially in the form of Exhibit H and (ii) a certificate from a Licensed Professional Engineer substantially in the form of Exhibit I setting forth the Installed Capacity on the Commercial Operation Date;
(d) A Participating Generator Agreement and a Meter Service Agreement for Metered Entities between Seller and CAISO shall have been executed and delivered and be in full force and effect, and a copy of each such agreement delivered to Buyer; (e) An Interconnection Agreement between Seller or Seller’s Affiliate and the PTO shall have been executed and delivered and be in full force and effect and a copy of the Interconnection Agreement delivered to Buyer;
(f) All applicable regulatory authorizations, approvals and permits required for the operation of the Facility have been obtained and all required conditions thereof that are required to be satisfied by the Commercial Operation Date have been satisfied and shall be in full force and effect (including CEQA requirements);
(g) Seller has provided notice that Seller (either itself or through the engagement of an Affiliate) will act as the Qualified Operator for the Facility, or Seller has entered into one or more agreements providing for the operation and maintenance of the Facility with one or more other Qualified Operators;
(h) Seller, with the reasonable cooperation of Buyer, has taken all actions and executed and delivered to Buyer and the CAISO all documents that are reasonably capable of being completed prior to the Commercial Operation Date necessary to register and quality the Facility to participate and operate in the CAISO markets, as set forth in the CAISO Tariff, including satisfying and completing the CAISO New Resource Implementation process (commonly referred to as the “NRI Process”) with respect to the Facility;
(i) Seller has received CEC Precertification of the Facility (and reasonably expects to receive final CEC Certification and Verification for the Facility in no more than one hundred eighty (180) days from the Commercial Operation Date);