Cities Index.
Agenda packet

Vallejo City Council
May 28, 2024

Document
Agenda packet
Meeting
May 28, 2024
Body
Vallejo City Council
Pages
64
Original file
111.6 MB
Text extracted from the city's file for reading and search. Open the original on vallejoca.api.civicclerk.com. That file is the official record.

Direct Costs 2024-25 Budget
Contract Maintenance Costs $7,002
Salaries & Benefits $12,986
Services & Supplies $1,610
Landscape Water $15,000
Utilities $150
Landscape Rehabilitation / Vandalism $10,000
Capital Projects $0
Total Direct Costs $46,748
Administration Costs
Administration & Overhead $7,750
County Administration Fees $0
Professional Fees $667
Total Administration Costs $8,417
Collections / (Credits) Applied To Levy
Total Direct and Administration Costs $55,165
Contribution to / (from) Reserve Fund $0
Contribution to / (from) Rehabilitation Fund $70,967
Contribution (from) General Fund / Other Revenue ($9,137) Balance to Levy $116,995
District Statistics
Total Parcels 377
Total Parcels Levied 377
Anticipated Total Assessed Value / $100 $1,169,949.01
Proposed Rate per $100 of Assessed Value $0.100
Maximum Rate per $100 of Assessed Value $1.50
Total Assessment Levy $116,994.90
Fund Balance Information
Beginning Operating Reserve Fund Balance $27,582.50
Operating Reserve Fund Adjustments $0.00
Anticipated Operating Reserve Fund Balance $27,582.50
Beginning Rehabilitation Reserve Fund Balance $886,097.50 Rehabilitation Reserve Fund Adjustments $70,967.00
Anticipated Rehabilitation Reserve Fund Balance $957,064.50 Anticipated Total Ending Fund Balance $984,647.00
Estimate of Cost
City of Vallejo
Hunter Ranch I & II Landscape Maintenance District
Fund Number 0172 (#181)
City of Vallejo
Landscape Maintenance Districts
Overview Report, FY 2024-2025

Page 32 ends

Recommendations
The Reserve Fund balance for the District is adequately funded.

The following are recommendations to the City:
 Ensure the District Reserve Fund remains adequately funded.  Decrease the assessment rate provided the current level of service is unchanged and there are no unforeseen expenditures in order to decrease the contribution to the Reserve Fund.

Monica Place
The Monica Place Landscape Maintenance District (District) serves a residential neighborhood located in northeast Vallejo. The District is fully developed.

Special District Features
 The District was formed in 1976.
 The District has 1,000 square feet of weed control and plantings.  Landscape is ornamental ground cover.
 Weed control areas along Monica Place assist in fire protection and protection of the asphalt.
 Ad Valorem rate per $100 of assessed valuation: Current Rate: $.187, Maximum Rate:
$1.25.

Boundaries
The District lies within the City of Vallejo, generally located along the roadside of Monica Place.

Improvements
The District maintains weed control easements found along the edge of the asphalt and behind the sidewalk along Monica Place.

Financial Information
The Direct Costs of the District have not changed significantly from fiscal year 2023-2024 to fiscal year 2024-2025. The proposed assessment is below the maximum rate and is considered an exempt assessment pursuant to Californian Constitution Article XIIID Section 5(b).

City of Vallejo
Landscape Maintenance Districts
Overview Report, FY 2024-2025

Page 33 ends

The amounts identified as “Landscape Rehabilitation” or “Capital Projects” may be budgeted and spent each fiscal year as shown, or collected and held for the future in the Rehabilitation Fund.

The program can also draw from the Operating Reserve Fund as necessary if funds are in excess of six months of levy revenue. Replacement, rehabilitation or refurbishment of the improvements is an essential part of maintenance, but these projects and expenses will often impact the longterm financial stability of the District. Prior to the implementation of any rehabilitation plan, the City should closely evaluate the merits of the project.

City of Vallejo
Landscape Maintenance Districts
Overview Report, FY 2024-2025

Page 34 ends

Direct Costs 2024-25 Budget
Contract Maintenance Costs $319
Salaries & Benefits $0
Services & Supplies $0
Landscape Water $0
Utilities $0
Landscape Rehabilitation / Vandalism $0
Capital Projects $0
Total Direct Costs $319
Administration Costs
Administration & Overhead $0
County Administration Fees $0
Professional Fees $17
Total Administration Costs $17
Collections / (Credits) Applied To Levy
Total Direct and Administration Costs $336
Contribution to / (from) Reserve Fund $0
Contribution to / (from) Rehabilitation Fund $3,105
Contribution (from) General Fund / Other Revenue ($418) Balance to Levy $3,023
District Statistics
Total Parcels 5
Total Parcels Levied 5
Anticipated Total Assessed Value / $100 $16,164.63
Proposed Rate per $100 of Assessed Value $0.187
Maximum Rate per $100 of Assessed Value $1.25
Total Assessment Levy $3,022.79
Fund Balance Information
Beginning Operating Reserve Fund Balance $168.00
Operating Reserve Fund Adjustments $0.00
Anticipated Operating Reserve Fund Balance $168.00
Beginning Rehabilitation Reserve Fund Balance $41,610.00 Rehabilitation Reserve Fund Adjustments $3,105.00
Anticipated Rehabilitation Reserve Fund Balance $44,715.00 Anticipated Total Ending Fund Balance $44,883.00
Estimate of Cost
City of Vallejo
Monica Place Road Landscape Maintenance District
Fund Number 0163 (#167)
City of Vallejo
Landscape Maintenance Districts
Overview Report, FY 2024-2025

Page 35 ends

Recommendations
The Reserve Fund balance for the District is adequately funded.

The following are recommendations to the City:
 Ensure the District Reserve Fund remains adequately funded.  Consider decreasing the assessment in the future provided the current level of service is unchanged and there are no unforeseen expenditures.

Ridgecrest
The Ridgecrest Point Landscape Maintenance District (District) serves a residential neighborhood located in northeast Vallejo. The District is fully developed.

Special District Features
 The District was formed in 1978.
 Ad Valorem rate per $100 of assessed valuation: Current Rate: $0.115, Maximum Rate:
$1.50.
 The District is composed of six Pacific Gas & Electric easements and one area of ornamental plantings. The PG&E easements are composed of four with ornamental plants and two with weed height control and native/drought resistant plants.  Weed control assists in fire protection.

Boundaries
The District lies within the City of Vallejo, generally located within the Woodvale Court cul-de-sac and the area bounded by Sylvia Court, Hale Street, Delgado Street, Clatyon Court, Elna Drive, Henry Street, and Woodvale Court.

Improvements
The District maintains landscaping and weed control in the following areas:
 The PG&E easements found within chain-link fence enclosures on each side of Woodvale Street crossing extending north to and crossing Skyline Drive and along the south side of Goheen Circle
 Rear yard fence lines.

City of Vallejo
Landscape Maintenance Districts
Overview Report, FY 2024-2025

Page 36 ends

Financial Information
The Direct Costs of the District not changed significantly from fiscal year 2023-2024 to fiscal year 2024-2025. This proposed assessment is below the maximum rate and is considered an exempt assessment pursuant to Californian Constitution Article XIIID Section 5(b).

City of Vallejo
Landscape Maintenance Districts
Overview Report, FY 2024-2025

Page 37 ends

Direct Costs 2024-25 Budget
Contract Maintenance Costs $15,277
Salaries & Benefits $0
Services & Supplies $0
Landscape Water $4,000
Utilities $0
Landscape Rehabilitation / Vandalism $15,000
Capital Projects $0
Total Direct Costs $34,277
Administration Costs
Administration & Overhead $0
County Administration Fees $0
Professional Fees $390
Total Administration Costs $390
Collections / (Credits) Applied To Levy
Total Direct and Administration Costs $34,667
Contribution to / (from) Reserve Fund $0
Contribution to / (from) Rehabilitation Fund $36,292
Contribution (from) General Fund / Other Revenue ($2,468) Balance to Levy $68,491
District Statistics
Total Parcels 171
Total Parcels Levied 171
Anticipated Total Assessed Value / $100 $595,580.34
Proposed Rate per $100 of Assessed Value $0.115
Maximum Rate per $100 of Assessed Value $1.50
Total Assessment Levy $68,491.74
Fund Balance Information
Beginning Operating Reserve Fund Balance $17,333.50
Operating Reserve Fund Adjustments $0.00
Anticipated Operating Reserve Fund Balance $17,333.50
Beginning Rehabilitation Reserve Fund Balance $229,425.50 Rehabilitation Reserve Fund Adjustments $36,292.00
Anticipated Rehabilitation Reserve Fund Balance $265,717.50 Anticipated Total Ending Fund Balance $283,051.00
Estimate of Cost
City of Vallejo
Ridgecrest Landscape Maintenance District
Fund Number 0193 (#169)
City of Vallejo
Landscape Maintenance Districts
Overview Report, FY 2024-2025

Page 38 ends

Recommendations
The Reserve Fund balance for the District is adequately funded.

The following are recommendations to the City:
 Ensure the District Reserve Fund is adequately funded.  Consider decreasing the assessment in the future provided the current level of service is unchanged and there are no unforeseen expenditures.

Somerset Highlands (I/II)
The District lies within the City of Vallejo, generally located within the area bounded by Columbus Parkway, Georgia Street, and Regents Parkway.

Special District Features
 The District was originally formed in 1975.
 The District has 2 acres of native and ornamental ground cover, shrubbery and trees.  The District has 5 acres of weed control.
 Weed control in open space areas assists in fire protection.  Ad Valorem rate per $100 of assessed valuation: Current Rate: $.06, Maximum Rate:
$1.25.

Boundaries
The District lies within the City of Vallejo, generally located within the area bounded by Columbus Parkway, Georgia Street, and Regents Parkway.

Improvements
The District maintains landscaping and weed control in the following areas:
 Slope along Columbus Parkway from Georgia Street north to the rail fence and south to Regents Parkway.
 Open space along Regents Parkway to Brunswick.

Financial Information
The Direct Costs of the District have not changed significantly from fiscal year 2023-2024 to fiscal year 2024-2025. The proposed assessment is below the maximum rate and is considered an exempt assessment pursuant to Californian Constitution Article XIIID Section 5(b).

City of Vallejo
Landscape Maintenance Districts
Overview Report, FY 2024-2025

Page 39 ends

The amounts identified as “Landscape Rehabilitation” or “Capital Projects” may be budgeted and spent each fiscal year as shown, or collected and held for the future in the Rehabilitation Fund.

The program can also draw from the Operating Reserve Fund as necessary if funds are in excess of six months of levy revenue. Replacement, rehabilitation or refurbishment of the improvements is an essential part of maintenance, but these projects and expenses will often impact the longterm financial stability of the District. Prior to the implementation of any rehabilitation plan, the City should closely evaluate the merits of the project.

City of Vallejo
Landscape Maintenance Districts
Overview Report, FY 2024-2025

Page 40 ends

Direct Costs 2024-25 Budget
Contract Maintenance Costs $45,831
Salaries & Benefits $21,863
Services & Supplies $2,711
Landscape Water $3,000
Utilities $300
Landscape Rehabilitation / Vandalism $5,000
Capital Projects $0
Total Direct Costs $78,705
Administration Costs
Administration & Overhead $13,048
County Administration Fees $0
Professional Fees $629
Total Administration Costs $13,677
Collections / (Credits) Applied To Levy
Total Direct and Administration Costs $92,382
Contribution to / (from) Reserve Fund $0
Contribution to / (from) Rehabilitation Fund $22,127
Contribution (from) General Fund / Other Revenue ($4,191) Balance to Levy $110,318
District Statistics
Total Parcels 533
Total Parcels Levied 533
Anticipated Total Assessed Value / $100 $1,838,626.03
Proposed Rate per $100 of Assessed Value $0.060
Maximum Rate per $100 of Assessed Value $1.25
Total Assessment Levy $110,317.56
Fund Balance Information
Beginning Operating Reserve Fund Balance $46,191.00
Operating Reserve Fund Adjustments $0.00
Anticipated Operating Reserve Fund Balance $46,191.00
Beginning Rehabilitation Reserve Fund Balance $372,955.00 Rehabilitation Reserve Fund Adjustments $22,127.00
Anticipated Rehabilitation Reserve Fund Balance $395,082.00 Anticipated Total Ending Fund Balance $441,273.00
City of Vallejo
Somerset Highlands I & II Landscape Maintenance District Fund Number 0109 (#173)
Estimate of Cost
City of Vallejo
Landscape Maintenance Districts
Overview Report, FY 2024-2025

Page 41 ends

Recommendations
The Reserve Fund balance for the District is adequately funded.

The following are recommendations to the City:
 Ensure the District Reserve Fund remains adequately funded.

Somerset Highlands III
The Somerset Highlands Three Landscape Maintenance District (District) serves a residential neighborhood located in northeast Vallejo. The District is fully developed.

Special District Features
The District was formed in 1981.

The District has 7 acres of native and ornamental ground cover, shrubbery and trees.

The District has 4 acres of weed control.

Weed control in open space areas assists in fire protection.

Ad Valorem rate per $100 of assessed valuation: Current Rate: $.144, Maximum Rate:
$1.50.

Boundaries
The District lies within the City of Vallejo, generally located within the area bounded by Locust Drive, Ascot Parkway, Columbus Parkway, and Rock Springs Golf Course.

Improvements
The District maintains landscaped areas and weed control in the following areas:
 Landscape slope along the east and west side of Ascot Parkway.  Medians from just south of Hawksbury Drive to the intersection of Columbus  Parkway to the end of the sound wall along the north side of Columbus Parkway.  Strip of landscaping running along two hundred feet east of the intersection of Columbus and Ascot Parkways at the sound wall to the back of the curb.  Interior slope beneath the power lines and slope overlooking the Blue Rock Springs Golf Course.

Financial Information
The Direct Costs of the District have not changed significantly from fiscal year 2023-2024 to fiscal year 2024-2025. The proposed assessment is below the maximum rate and is considered an exempt assessment pursuant to Californian Constitution Article XIIID Section 5(b).

City of Vallejo
Landscape Maintenance Districts
Overview Report, FY 2024-2025

Page 42 ends

The amounts identified as “Landscape Rehabilitation” or “Capital Projects” may be budgeted and spent each fiscal year as shown, or collected and held for the future in the Rehabilitation Fund.

The program can also draw from the Operating Reserve Fund as necessary if funds are in excess of six months of levy revenue. Replacement, rehabilitation or refurbishment of the improvements is an essential part of maintenance, but these projects and expenses will often impact the longterm financial stability of the District. Prior to the implementation of any rehabilitation plan, the City should closely evaluate the merits of the project.

City of Vallejo
Landscape Maintenance Districts
Overview Report, FY 2024-2025

Page 43 ends

Direct Costs 2024-25 Budget
Contract Maintenance Costs $11,458
Salaries & Benefits $14,575
Services & Supplies $1,807
Landscape Water $11,947
Utilities $180
Landscape Rehabilitation / Vandalism $12,500
Capital Projects $0
Total Direct Costs $52,467
Administration Costs
Administration & Overhead $8,698
County Administration Fees $0
Professional Fees $715
Total Administration Costs $9,413
Collections / (Credits) Applied To Levy
Total Direct and Administration Costs $61,880
Contribution to / (from) Reserve Fund $0
Contribution to / (from) Rehabilitation Fund $66,930
Contribution (from) General Fund / Other Revenue ($3,221) Balance to Levy $125,589
District Statistics
Total Parcels 233
Total Parcels Levied 233
Anticipated Total Assessed Value / $100 $872,147.73
Proposed Rate per $100 of Assessed Value $0.144
Maximum Rate per $100 of Assessed Value $1.50
Total Assessment Levy $125,589.27
Fund Balance Information
Beginning Operating Reserve Fund Balance $30,940.00
Operating Reserve Fund Adjustments $0.00
Anticipated Operating Reserve Fund Balance $30,940.00
Beginning Rehabilitation Reserve Fund Balance $291,177.00 Rehabilitation Reserve Fund Adjustments $66,930.00
Anticipated Rehabilitation Reserve Fund Balance $358,107.00 Anticipated Total Ending Fund Balance $389,047.00
City of Vallejo
Somerset Highlands III Landscape Maintenance District
Fund Number 0171 (#176)
Estimate of Cost
City of Vallejo
Landscape Maintenance Districts
Overview Report, FY 2024-2025

Page 44 ends

Recommendations
The Reserve Fund balance for the District is adequately funded.

The following are recommendations to the City:
 Ensure the District Reserve Fund is adequately funded.

Springtree
The Springtree Landscape Maintenance District (District) serves a residential neighborhood consisting of four developments located in northeast Vallejo. The District is fully developed.

Special District Features
 The District was formed in 1978 with one annexation in 1979.  The District has 1 acre of native and ornamental ground cover, shrubbery and trees  The District has 10 acres of weed control.
 Weed control in open space areas assists in fire protection.  Ad Valorem rate per $100 of assessed valuation: Current Rate: $.195, Maximum Rate:
$1.50.

Boundaries
The District lies within the City of Vallejo, generally located within the area bounded by Tuolumne Street, Guava Court, Platt and Wake Court, Parkview Terrace, Phoenix Circle and the water treatment fence line.

Improvements
The District maintains landscaping and weed control in the following areas:
 Landscaping along Tuolumne Street starting from Parkview Terrace, Public LMD behind lot 7, ending at the intersection of Phoenix Circle.
 South side of Tuolumne Street beginning at Ridgeview Drive and ending at the rear of lot 8 at Guava Court.
 Behind the residences along the south side of Mitchell Court and Riverview Drive.  Open space bounded by Platt and Wake Court and Parkview Terrace and the water treatment plant fence line.
 Public LMD on the north side of Amber Avenue, south side adjoining the park.  Public LMD situated below Phoenix Circle from lots 27-42 and behind the homes on Pepper Avenue.

City of Vallejo
Landscape Maintenance Districts
Overview Report, FY 2024-2025

Page 45 ends

Capital projects include remove and replace landscape and irrigation to keep up with current standards.

Financial Information
The Direct Costs of the District have increased from fiscal year 2023-2024 to fiscal year 2024-2025 due to increased landscape rehabilitation costs. The proposed assessment is below the maximum rate and is considered an exempt assessment pursuant to Californian Constitution Article XIIID Section 5(b).

The amounts identified as “Landscape Rehabilitation” or “Capital Projects” may be budgeted and spent each fiscal year as shown, or collected and held for the future in the Rehabilitation Fund.

The program can also draw from the Operating Reserve Fund as necessary if funds are in excess of six months of levy revenue. Replacement, rehabilitation or refurbishment of the improvements is an essential part of maintenance, but these projects and expenses will often impact the longterm financial stability of the District. Prior to the implementation of any rehabilitation plan, the City should closely evaluate the merits of the project.

City of Vallejo
Landscape Maintenance Districts
Overview Report, FY 2024-2025

Page 46 ends

Direct Costs 2024-25 Budget
Contract Maintenance Costs $27,115
Salaries & Benefits $23,023
Services & Supplies $2,855
Landscape Water $8,688
Utilities $1,200
Landscape Rehabilitation / Vandalism $20,000
Capital Projects $0
Total Direct Costs $82,881
Administration Costs
Administration & Overhead $13,740
County Administration Fees $0
Professional Fees $940
Total Administration Costs $14,680
Collections / (Credits) Applied To Levy
Total Direct and Administration Costs $97,561
Contribution to / (from) Reserve Fund $0
Contribution to / (from) Rehabilitation Fund $81,053
Contribution (from) General Fund / Other Revenue ($13,545) Balance to Levy $165,069
District Statistics
Total Parcels 297
Total Parcels Levied 297
Anticipated Total Assessed Value / $100 $846,507.30
Proposed Rate per $100 of Assessed Value $0.195
Maximum Rate per $100 of Assessed Value $1.50
Total Assessment Levy $165,068.92
Fund Balance Information
Beginning Operating Reserve Fund Balance $48,780.50
Operating Reserve Fund Adjustments $0.00
Anticipated Operating Reserve Fund Balance $48,780.50
Beginning Rehabilitation Reserve Fund Balance $1,305,693.50 Rehabilitation Reserve Fund Adjustments $81,052.74
Anticipated Rehabilitation Reserve Fund Balance $1,386,746.24 Anticipated Total Ending Fund Balance $1,435,526.74
City of Vallejo
Springtree Landscape Maintenance District
Fund Number 0192 (#172)
Estimate of Cost
City of Vallejo
Landscape Maintenance Districts
Overview Report, FY 2024-2025

Page 47 ends

Recommendations
The Reserve Fund balance for the District is adequately funded.

The following are recommendations to the City:
 Ensure the District Reserve Fund remains adequately funded.  Consider decreasing the assessment in the future provided the current level of service is unchanged and there are no unforeseen expenditures.

Summit II
The Summit Two Landscape Maintenance District (District) serves a residential neighborhood made from two subdivisions located in northeast Vallejo. The District is fully developed.

Special District Features
 The District was formed in 1978 with one annexation in 1979.  The District has 3.5 acres of weed control.
 Weed control in open space areas assists in fire protection.  Ad Valorem rate per $100 of assessed valuation: Current Rate: $.095, Maximum Rate:
$1.50.

Boundaries
The District lies within the City of Vallejo, generally located within the area bounded by Hillview Drive, Sunrise Way and the P.G. & E. towers.

Improvements
The District maintains landscaping and weed control in the following areas:

Remove the hazardous tree conditions behind the homes on Hillview and Sunrise Drive.

Improve the fire protection grass control under the PGE power lines.

Financial Information
The Direct Costs of the District have not changed significantly from fiscal year 2023-2024 to fiscal year 2024-2025. The proposed assessment is below the maximum rate and is considered an exempt assessment pursuant to Californian Constitution Article XIIID Section 5(b).

City of Vallejo
Landscape Maintenance Districts
Overview Report, FY 2024-2025

Page 48 ends

The amounts identified as “Landscape Rehabilitation” or “Capital Projects” may be budgeted and spent each fiscal year as shown, or collected and held for the future in the Rehabilitation Fund.

The program can also draw from the Operating Reserve Fund as necessary if funds are in excess of six months of levy revenue. Replacement, rehabilitation or refurbishment of the improvements is an essential part of maintenance, but these projects and expenses will often impact the longterm financial stability of the District. Prior to the implementation of any rehabilitation plan, the City should closely evaluate the merits of the project.

City of Vallejo
Landscape Maintenance Districts
Overview Report, FY 2024-2025

Page 49 ends

Direct Costs 2024-25 Budget
Contract Maintenance Costs $4,838
Salaries & Benefits $3,974
Services & Supplies $493
Landscape Water $0
Utilities $0
Landscape Rehabilitation / Vandalism $5,000
Capital Projects $0
Total Direct Costs $14,305
Administration Costs
Administration & Overhead $2,371
County Administration Fees $0
Professional Fees $293
Total Administration Costs $2,664
Collections / (Credits) Applied To Levy
Total Direct and Administration Costs $16,969
Contribution to / (from) Reserve Fund $0
Contribution to / (from) Rehabilitation Fund $38,428
Contribution (from) General Fund / Other Revenue ($4,051) Balance to Levy $51,346
District Statistics
Total Parcels 171
Total Parcels Levied 171
Anticipated Total Assessed Value / $100 $540,483.27
Proposed Rate per $100 of Assessed Value $0.095
Maximum Rate per $100 of Assessed Value $1.50
Total Assessment Levy $51,345.91
Fund Balance Information
Beginning Operating Reserve Fund Balance $8,484.50
Operating Reserve Fund Adjustments $0.00
Anticipated Operating Reserve Fund Balance $8,484.50
Beginning Rehabilitation Reserve Fund Balance $396,657.50 Rehabilitation Reserve Fund Adjustments $38,428.00
Anticipated Rehabilitation Reserve Fund Balance $435,085.50 Anticipated Total Ending Fund Balance $443,570.00
City of Vallejo
Summit II Landscape Maintenance District
Fund Number 0188 (#164)
Estimate of Cost
City of Vallejo
Landscape Maintenance Districts
Overview Report, FY 2024-2025

Page 50 ends

Recommendations
The Reserve Fund balance for the District is adequately funded.

The following are recommendations to the City:
 Ensure the District Reserve Fund remains adequately funded.  Consider decreasing the assessment in the future provided the current level of service is unchanged and there are no unforeseen expenditures.

Town & Country
The Town & Country One Landscape Maintenance District (District) serves a residential neighborhood located in northwest Vallejo. The District is fully developed.

Special District Features
 The District was formed in 1980.
 The District has 1.5 acres of ornamental shrubbery and trees.  Weed control assists in fire protection.
 Ad Valorem rate per $100 of assessed valuation: Current Rate: $.150, Maximum Rate:
$1.50.

Boundaries
The District lies within the City of Vallejo, generally located within the area bounded by Fairgrounds Drive, Marine World Parkway fence, and the North Vallejo Community Park Ball Field.

Improvements
The District maintains landscaping and weed control in the following areas:
 Slope on Fairgrounds Drive from Marine World Parkway fence to the North Vallejo Community Park Ball Field.
 Walkway from Basalt down to the North Vallejo Community Park Ball Field.

Capital projects include replacement of a fence.

City of Vallejo
Landscape Maintenance Districts
Overview Report, FY 2024-2025

Page 51 ends

Financial Information
The Direct Costs of the District increased from fiscal 2023-2024 to fiscal year 2024-2025 due to planned Capital Projects. The proposed assessment is below the maximum rate and is considered an exempt assessment pursuant to Californian Constitution Article XIIID Section 5(b).

The amounts identified as “Landscape Rehabilitation” or “Capital Projects” may be budgeted and spent each fiscal year as shown, or collected and held for the future in the Rehabilitation Fund.

The program can also draw from the Operating Reserve Fund as necessary if funds are in excess of six months of levy revenue. Replacement, rehabilitation or refurbishment of the improvements is an essential part of maintenance, but these projects and expenses will often impact the longterm financial stability of the District. Prior to the implementation of any rehabilitation plan, the City should closely evaluate the merits of the project.

City of Vallejo
Landscape Maintenance Districts
Overview Report, FY 2024-2025

Page 52 ends

Direct Costs 2024-25 Budget
Contract Maintenance Costs $13,952
Salaries & Benefits $8,252
Services & Supplies $1,023
Landscape Water $1,000
Utilities $480
Landscape Rehabilitation / Vandalism $5,000
Capital Projects $75,000
Total Direct Costs $104,707
Administration Costs
Administration & Overhead $4,925
County Administration Fees $0
Professional Fees $298
Total Administration Costs $5,223
Collections / (Credits) Applied To Levy
Total Direct and Administration Costs $109,930
Contribution to / (from) Reserve Fund $0
Contribution to / (from) Rehabilitation Fund ($55,428)
Contribution (from) General Fund / Other Revenue ($2,212) Balance to Levy $52,290
District Statistics
Total Parcels 124
Total Parcels Levied 124
Anticipated Total Assessed Value / $100 $348,599.58
Proposed Rate per $100 of Assessed Value $0.150
Maximum Rate per $100 of Assessed Value $1.50
Total Assessment Levy $52,289.94
Fund Balance Information
Beginning Operating Reserve Fund Balance $54,965.00
Operating Reserve Fund Adjustments $0.00
Anticipated Operating Reserve Fund Balance $54,965.00
Beginning Rehabilitation Reserve Fund Balance $166,234.00 Rehabilitation Reserve Fund Adjustments ($55,428.00)
Anticipated Rehabilitation Reserve Fund Balance $110,806.00 Anticipated Total Ending Fund Balance $165,771.00
Estimate of Cost
City of Vallejo
Town & Country 1 Landscape Maintenance District
Fund Number 0122 (#165)
City of Vallejo
Landscape Maintenance Districts
Overview Report, FY 2024-2025

Page 53 ends

Recommendations
The Reserve Fund balance for the District is adequately funded.

The following are recommendations to the City:
 Ensure the District Reserve Fund remains adequately funded.  Consider decreasing the assessment in the future provided the current level of service is unchanged and there are no unforeseen expenditures.

Woodridge
The Woodridge Landscape Maintenance District (District) serves a residential neighborhood located in northeast Vallejo. The District is fully developed.

Special District Features
 The District was formed in 1977.
 The District has 6 acres of native and ornamental ground cover, shrubbery and trees.  The District has 11 acres of weed control.
 Weed control in open space areas assists in fire protection.  Ad Valorem rate per $100 of assessed valuation: Current Rate: $.071, Maximum Rate:
$1.50.

Boundaries
The District lies within the City of Vallejo, made up of several islands as generally located within the area bounded by Tennessee Street and Oakwood; Masonic Drive and Oakwood; Evergreen, Parhaven Court and Temple; Woodson Way, Blue Bird, Robin Courts, Skyline Drive and Blue Rock Springs Corridor.

Improvements
The District maintains landscaping and weed control in the following areas:
 Landscaped slope along the north side of Tennessee Street behind Lain Court.  Island at the corner of Tennessee and Oakwood, the easement directly west of the island and behind the homes of Bridge Court.
 Easement off Evergreen Way on the south side bounded by the rear yard fences of Curtis and Springbrook.
 Easement open space up slope of Evergreen and behind Park Haven Court and down slope of Temple.
 Open space between Masonic Drive and Oakwood just south of Justin Court.

City of Vallejo
Landscape Maintenance Districts
Overview Report, FY 2024-2025

Page 54 ends

 Open space above Woodson Way and below Blue Bid and Robin Courts.  The rear slope of Wood Court, Skyline Drive, and Masonic Court above Blue Rock Springs Corridor including the eucalyptus grove to within one hundred feet of the creak at high stage.
 Slope behind Creekview, Glenview, and the open space entrance to the rear slope and frontage along the creek behind the private frontage road along Redwood.  The islands of Redwood and the frontage landscaping from just west of Foothill to Doncaster on the north side and 500 feet west of Topley on the south side.

Financial Information
The Direct Costs of the District have not changed significantly from fiscal year 2023-2024 to fiscal year 2024-2025. The proposed assessment is below the maximum rate and is considered an exempt assessment pursuant to Californian Constitution Article XIIID Section 5(b).

The amounts identified as “Landscape Rehabilitation” or “Capital Projects” may be budgeted and spent each fiscal year as shown, or collected and held for the future in the Rehabilitation Fund.

The program can also draw from the Operating Reserve Fund as necessary if funds are in excess of six months of levy revenue. Replacement, rehabilitation or refurbishment of the improvements is an essential part of maintenance, but these projects and expenses will often impact the longterm financial stability of the District. Prior to the implementation of any rehabilitation plan, the City should closely evaluate the merits of the project.

City of Vallejo
Landscape Maintenance Districts
Overview Report, FY 2024-2025

Page 55 ends

Direct Costs 2024-25 Budget
Contract Maintenance Costs $11,458
Salaries & Benefits $12,803
Services & Supplies $1,588
Landscape Water $10,000
Utilities $240
Landscape Rehabilitation / Vandalism $10,000
Capital Projects $0
Total Direct Costs $46,089
Administration Costs
Administration & Overhead $7,641
County Administration Fees $0
Professional Fees $567
Total Administration Costs $8,208
Collections / (Credits) Applied To Levy
Total Direct and Administration Costs $54,297
Contribution to / (from) Reserve Fund $0
Contribution to / (from) Rehabilitation Fund $50,012
Contribution (from) General Fund / Other Revenue ($4,772) Balance to Levy $99,537
District Statistics
Total Parcels 449
Total Parcels Levied 449
Anticipated Total Assessed Value / $100 $1,401,924.71
Proposed Rate per $100 of Assessed Value $0.071
Maximum Rate per $100 of Assessed Value $1.50
Total Assessment Levy $99,536.65
Fund Balance Information
Beginning Operating Reserve Fund Balance $27,148.50
Operating Reserve Fund Adjustments $0.00
Anticipated Operating Reserve Fund Balance $27,148.50
Beginning Rehabilitation Reserve Fund Balance $450,049.50 Rehabilitation Reserve Fund Adjustments $50,012.00
Anticipated Rehabilitation Reserve Fund Balance $500,061.50 Anticipated Total Ending Fund Balance $527,210.00
City of Vallejo
Woodridge Landscape Maintenance District
Fund Number 0118 (#174)
Estimate of Cost
City of Vallejo
Landscape Maintenance Districts
Overview Report, FY 2024-2025

Page 56 ends

Recommendations
The Reserve Fund balance for the District is adequately funded.

The following are recommendations to the City:
 Ensure the District Reserve Fund remains adequately funded.  Consider decreasing the assessment in the future provided the current level of service is unchanged and there are no unforeseen expenditures.

CONSENT CALENDAR 8.H.

DATE: May 28, 2024
TO: Mayor and Members of the City Council
FROM: Melissa Tigbao, P.E., Public Works Director
Jason Lacey, Landscape Maintenance Manager
SUBJECT: ADOPT A RESOLUTION APPROVING THE ENGINEER'S REPORT AND DECLARING THE INTENTION TO LEVY AND COLLECT ASSESSMENTS FOR FISCAL YEAR 2024-25

WITHIN THE BORDONI RANCH, CARRIAGE OAKS, GARTHE RANCH, GLEN COVE III, GLEN COVE III 2015, HUNTER RANCH III, MARINE WORLD/FAIRGROUNDS,

MARINVIEW, NORTHEAST QUADRANT, SANDPIPER POINT, SOUTH VALLEJO

BUSINESS PARK, AND TOWN AND COUNTRY II - V LANDSCAPE MAINTENANCE DISTRICTS AND SETTING A PUBLIC HEARING FOR JUNE 11, 2024, AT 7:00 P.M.

RECOMMENDATION
Adopt a Resolution approving the Engineer's Report and declaring the intention to levy and collect assessments for fiscal year 2024-25 within the Bordoni Ranch, Carriage Oaks, Garthe Ranch, Glen Cove III, Glen Cove III 2015, Hunter Ranch III, Marine World/Fairgrounds, Marinview, Northeast Quadrant, Sandpiper Point, South Vallejo Business Park, and Town and Country II - V Landscape Maintenance Districts and setting a public hearing for June 11, 2024, at 7:00 PM.

REASONS FOR RECOMMENDATION
The City Council appointed SCI Consulting Group as the Engineer of Work and directed it to prepare the Engineer's Reports for these twelve LMDs. The Engineer’s Report has been prepared which identifies all assessable parcels in each LMD in order to comply with the provisions of California Constitution Article XIIID (Proposition 218). A public hearing is legally required to allow the City Council to levy the assessments.

BACKGROUND AND DISCUSSION
The City of Vallejo has 27 Landscape Maintenance Districts LMDs), thirteen of which were established in accordance with the Landscape and Lighting Act of 1972 (1972 Act), and fourteen of which were established in accordance with the Improvement Act of 1911 (1911 Act). The City Council will be considering the 1911 Act districts and the Hiddenbrooke Landscape Maintenance District under separate Council actions.

Approval of this resolution formally starts the process for establishing the fiscal year 2024-25 assessments for the following twelve LMDs: Bordoni Ranch, Carriage Oaks, Garthe Ranch, Glen Cove III, Glen Cove III 2015, Hunter Ranch III, Marine World/Fairgrounds, Marinview, Northeast Quadrant, Sandpiper Point, South Vallejo Business Park, and Town and Country II-V. Several of the districts are broken further into different operational areas, and may have assessments that vary from other operational areas within the same district.

An Engineer’s Report (“Report”) is prepared annually for each LMD formed under the 1972 Act. Proposed assessments for each parcel are based on the special benefit received by the parcels within each district. The Report analyzes the district based on “equivalent benefit units” (EBU), with one EBU applied to a single-family residence. The proposed FY 2024-25 budget for these districts is included as part of the Report.

The annual costs and expenses to provide and maintain the improvements in each district are assessed proportionately to those parcels within each district that receive special benefits from the improvements. With Date: May 28, 2024
Subject: ADOPT A RESOLUTION APPROVING THE ENGINEER'S REPORT AND DECLARING

THE INTENTION TO LEVY AND COLLECT ASSESSMENTS FOR FISCAL YEAR 2024-25 WITHIN THE BORDONI RANCH, CARRIAGE OAKS, GARTHE RANCH, GLEN COVE III, GLEN COVE III 2015, HUNTER RANCH III, MARINE

WORLD/FAIRGROUNDS, MARINVIEW, NORTHEAST QUADRANT, SANDPIPER

POINT, SOUTH VALLEJO BUSINESS PARK, AND TOWN AND COUNTRY II - V

LANDSCAPE MAINTENANCE DISTRICTS AND SETTING A PUBLIC HEARING FOR JUNE 11, 2024, AT 7:00 P.M.

Page 2 ends

the exception of two districts, South Vallejo Business Park and Marine World/Fairgrounds, single-family residences make up the majority of parcels within the LMDs.

In fiscal year 1999-00, in accordance with Proposition 218, balloting was conducted to increase the amount of the assessment within the Northeast Quadrant LMD to provide a higher level of service. The assessment increase was approved by the property owners.

In fiscal year 2007-08, in accordance with Proposition 218, balloting was conducted within the Carriage Oaks, Garthe Ranch (does not include Garthe Ranch B), Glen Cove III, Hunter Ranch III, Marine World/Fairgrounds, Sandpiper Point, South Vallejo Business Park, and Town and Country II-V districts to increase the assessment amounts in order to provide a higher level of service. All of the LMDs, with the exception of Marine World/Fairgrounds and South Vallejo Business Park, rejected the proposed increases. This has resulted in a continued reduction in the levels of service that can be provided within these LMDs.

Examples of reduced services in FY 2024-25 are:
• The elimination of tree trimming and view enhancement • The elimination of fencing repairs
• Reduced irrigation service
• Reduction in the frequency of maintenance services
• Postponement of capital improvement projects
In 2015, balloting in accordance with Proposition 218 was conducted within Glen Cove III. The increase was approved, resulting in the formation of the Glen Cove III 2015 LMD.

The fiscal year 2024-25 Report for the 1972 Act LMDs is included as an attachment to this staff report and is also on file in the City Clerk’s Office (3rd Floor) and in the Department of Public Works (4th Floor), City Hall, 555 Santa Clara Street, Vallejo, California, 94590.

As shown in the chart below, many of the LMDs are proposed to be levied at the same rate as that assessed in FY 2023-24. The annual assessment rates for Glen Cove III 2015 are proposed to increase, as this district allows for an inflationary adjustment, to improve the level of service and set aside funds for future capital improvements. Consistent with Proposition 218, such increases are not considered increased assessments that require that a notice and ballot be sent to the property owners.

The following chart reflects both the approved FY 2023-24 levy per EBU and the proposed fiscal year 2024-25 levy per EBU:

DISTRICT
APPROVED FY 2023-24

ASSESSMENT
PROPOSED FY 2024-25

ASSESSMENT
% CHANGE
Bordoni Ranch Zone 1 $ 392.99 $ 392.99 0%
Date: May 28, 2024
Subject: ADOPT A RESOLUTION APPROVING THE ENGINEER'S REPORT AND DECLARING

THE INTENTION TO LEVY AND COLLECT ASSESSMENTS FOR FISCAL YEAR 2024-25 WITHIN THE BORDONI RANCH, CARRIAGE OAKS, GARTHE RANCH, GLEN COVE III, GLEN COVE III 2015, HUNTER RANCH III, MARINE

WORLD/FAIRGROUNDS, MARINVIEW, NORTHEAST QUADRANT, SANDPIPER

POINT, SOUTH VALLEJO BUSINESS PARK, AND TOWN AND COUNTRY II - V

LANDSCAPE MAINTENANCE DISTRICTS AND SETTING A PUBLIC HEARING FOR JUNE 11, 2024, AT 7:00 P.M.

Page 3 ends

Bordoni Ranch Zone 2 $ 270.33 $ 270.33 0%
Carriage Oaks $ 58.52 $ 58.52 0%
Garthe Ranch $ 128.46 $ 128.46 0%
Garthe Ranch "B"
(Highlands)
$ 2,075.42 $ 2,075.42 0%
Glen Cove III $ 155.14 $ 155.14 0%
Hunter Ranch III $ 72.04 $ 72.04 0%
Marine WorldFairgrounds$ 125.26 $ 125.26 0%
Marin View $ 636.00 $ 636.00 0%
Northeast Quadrant $ 287.24 $ 287.24 0%
Northeast Quadrant
Zone A
$ 444.20 $ 444.20 0%
Sandpiper Point $ 141.76 $ 141.76 0%
South Vallejo Business
Park
$ 3,286.60 $ 3,286.60 0%
Town & Country II-V $ 70.48 $ 70.48 0%
Glen Cove III 2015 Zone
A
$ 131.25 $ 134.69 2.62%
Glen Cove III 2015 Zone
B
$ 128.65 $ 132.02 2.62%
Glen Cove III 2015 Zone
C
$ 123.37 $ 126.60 2.62%
The proposed assessments for all LMDs comply with the provisions of Proposition 218. The total amount of funds to be assessed for these twelve 1972 Act Landscape Maintenance Districts in FY 2024-25 is $2,590,655.15.

FISCAL IMPACT
There is no fiscal impact to the General Fund.

LMD budgets are separate from the City’s General Fund. LMD assessments finance the maintenance improvements in the districts. The Public Works Department's costs for labor and materials associated with the LMDs are charged to the individual district budgets. All City costs associated with maintaining and administering the districts are covered by the annual assessments.

The financial health of the previously identified districts has been described in the Engineer’s Report. As noted in this report, required operating reserves will continue to be compromised and service levels reduced in those districts that have not had an increase to their assessment since their origination in the 1970s. FY 2024-25 funding in the remaining districts is adequate to maintain the current minimal service levels and to sustain the Date: May 28, 2024
Subject: ADOPT A RESOLUTION APPROVING THE ENGINEER'S REPORT AND DECLARING

THE INTENTION TO LEVY AND COLLECT ASSESSMENTS FOR FISCAL YEAR 2024-25 WITHIN THE BORDONI RANCH, CARRIAGE OAKS, GARTHE RANCH, GLEN COVE III, GLEN COVE III 2015, HUNTER RANCH III, MARINE

WORLD/FAIRGROUNDS, MARINVIEW, NORTHEAST QUADRANT, SANDPIPER

POINT, SOUTH VALLEJO BUSINESS PARK, AND TOWN AND COUNTRY II - V

LANDSCAPE MAINTENANCE DISTRICTS AND SETTING A PUBLIC HEARING FOR JUNE 11, 2024, AT 7:00 P.M.

Page 4 ends

required operating reserves.

ENVIRONMENTAL REVIEW
This action is exempt from the California Environmental Quality Act (CEQA) because it is not a project which has a potential for resulting in either a direct physical change in the environment, or a reasonably foreseeable indirect physical change in the environment, pursuant to CEQA Guideline section 15378.

ATTACHMENTS

1. Reso - 1972 LMDs FY24-25_CAO Stamp

2. Vallejo 1972 Act ER 5-6-24

CONTACT
Melissa Tigbao, P.E., Public Works Director (707) 648-4433 [email protected]
RESOLUTION NO. 24-___ N.C.

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF VALLEJO APPROVING THE ENGINEER’S REPORT AND DECLARING THE INTENTION TO LEVY AND COLLECT ASSESSMENTS FOR FISCAL YEAR 2024-2025 WITHIN THE BORDONI RANCH, CARRIAGE OAKS, GARTHE RANCH, GLEN COVE Ill, GLEN COVE Ill 2015, HUNTER RANCH Ill, MARINE WORLD/ FAIRGROUNDS, MARIN

VIEW, NORTHEAST QUADRANT, SANDPIPER POINT, SOUTH VALLEJO

BUSINESS PARK, AND THE TOWN AND COUNTRY II-V LANDSCAPE
MAINTENANCE DISTRICTS AND SETTING A PUBLIC HEARING FOR JUNE 11, 2024 AT 7:00 P.M.

WHEREAS, the City Council, by previous Resolutions, formed and levied annual assessments for twelve Landscape Maintenance Districts ("Districts" or “LMDs”), pursuant to the provisions of Article XIIID of the California Constitution and the Landscaping and Lighting Act of 1972, being Division 15, Part 2 of the California Streets and Highways Code (commencing with Section 22500 thereof) (the “1972 Act”); and
WHEREAS, those Districts consist of: Bordoni Ranch, Carriage Oaks, Garthe Ranch, Glen Cove Ill, Glen Cove Ill 2015, Hunter Ranch Ill, Marine World/Fairgrounds, Marin View, Northeast Quadrant, Sandpiper Point, South Vallejo Business Park, and Town and Country II-V; and WHEREAS, on April 9, 2024, the City Council, by resolution, ordered the preparation of an Engineer's Report for the Districts for fiscal year (FY) 2024-2025; and WHEREAS, the Engineer's Report was prepared by SCI Consulting Group, Inc. in accordance with Streets and Highways Code Section 22565 et. seq. and Article XIIID of the California Constitution.

NOW, THEREFORE, BE IT RESOLVED, DETERMINED, AND ORDERED BY THE CITY COUNCIL OF THE CITY OF VALLEJO AS FOLLOWS:

Section 1. The Engineer’s Report regarding the annual levy for the Districts for Fiscal Year 2024-2025 is hereby preliminarily approved and is directed to be filed in the Office of the City Clerk. Reference is hereby made to the Report for a full and detailed description of the improvements, any substantial changes in existing improvements, the boundaries of the Districts, and the proposed assessments upon assessable lots and parcels of land within the Districts.

Section 2. It is the intention of this Council to levy and collect assessments within the Districts for FY 2024-2025, as authorized under the 1972 Act. It is proposed that Districts undertake the following improvements including but not limited to turf, ground cover, shrubs, trees, drainage systems, irrigation systems, hardscape, and associated appurtenances within the public parcels, easements, and rights-of-way.

Section 3. The Districts consist of the lots and parcels shown on the boundary maps of the Districts on file with the City, and reference is hereby made to such maps for further particulars.

Section 4. The assessments for FY 2024-2025, except for the Glen Cove III 2015 LMD, represent no change from the assessments applied in FY 2023-2024.

Section 5. The Maximum Assessment Rate for the Bordoni Ranch LMD is equal to the Maximum Assessment Rate established for FY 2010-2011 and adjusted annually by the greater of three percent (3%) or the annual percentage change in the Consumer Price Index (CPI-U) of “All Urban Consumers” for the San Francisco-Oakland-San Jose Area.

The change in the CPI from February 2023 to February 2024 was 2.37%. Therefore, the maximum authorized assessment rate for the Bordini Ranch LMD fiscal year 2024-2025 is increased by 3.00% which equates to $753.49 per equivalent benefit unit for Zone 1 and $517.82 per equivalent benefit unit for Zone 2. The estimate of cost and budget in the Engineer’s Report proposes assessments for fiscal year 2024- 2025 at the rate of $392.99 per equivalent benefit unit for Zone 1 and $270.33 per equivalent benefit unit for Zone 2, which is the less than the maximum authorized assessment rate.

Section 6. The Maximum Assessment Rate for the Garthe Ranch LMD Zone B (Highlands) is equal to the Maximum Assessment Rate established for the previous fiscal year adjusted annually by the greater of, three percent (3%) or the annual percentage change in the Consumer Price Index for All Urban Consumers (CPI-U), as distributed by the Bureau of Labor Statistics for the San Francisco-Oakland-San Jose Area.

The change in the CPI from February 2023 to February 2024 was 2.37%. Therefore, the maximum authorized assessment rate for the Garthe Ranch LMD Zone B fiscal year 2024-2025 is increased by 3.00% which equates to $2,786.47 per equivalent benefit unit. The estimate of cost and budget in the Engineer’s Report proposes assessments for fiscal year 2024-2025 at the rate of $2,075.42, which is less than the maximum authorized assessment rate.

Section 7. The Maximum Assessment Rate for the Glen Cove III 2015 LMD is subject to an annual adjustment tied to the Consumer Price Index-U (CPI-U) for the San Francisco Bay Area as of December of each succeeding year. As the amount of the annual increase in the CPI from December 2022 to December 2023 is 2.62%, the maximum authorized assessment rates for fiscal year 2024-25 are 2.62% above the maximum authorized assessment rate for fiscal year 2023-24. Including the authorized annual adjustment, the maximum authorized assessment rates for fiscal year 2024-25 are $134.69 for properties in Zone A, $132.02 for properties in Zone B, and $126.60 for properties in Zone C, which are the maximum authorized assessment rates.

Section 8. The Maximum Assessment Rate for Marine World/Fairgrounds LMD is equal to the Maximum Assessment Rate established for the previous fiscal year adjusted annually by the annual percentage change in the Consumer Price Index for All Urban Consumers (CPI-U), as distributed by the Bureau of Labor Statistics for the San Francisco-Oakland-San Jose Area.

The change in the CPI from February 2023 to February 2024 was 2.37%. Therefore, the maximum authorized assessment rate for the Marine World / Fairgrounds LMD fiscal year 2024-2025 is increased by 2.37% which equates to $164.67 per equivalent benefit unit. The Engineer’s Report proposes assessments for fiscal year 2024-2025 at the rate of $125.26, which is less than the maximum authorized assessment rate.

Section 9. The Maximum Assessment Rate for the Northeast Quadrant LMD is increased each year by the percentage increase from April 1 of the prior year to April 1 of the current year by the Consumer Price Index for All Urban Consumers (CPI-U), as distributed by the Bureau of Labor Statistics (BLS) for the Consolidated Metropolitan Statistical Area (CMSA) covering San Francisco-Oakland-San Jose. If the April CPI-U is not available at the time the report is prepared, a similar time period may be used.

However, the maximum assessment rate in any fiscal year (for the Non-Zone A properties) shall not exceed $400 as adjusted by the CPI-U, unless approved by a majority vote of the property owners in the Northeast Quadrant LMD. Zone A’s assessment rate shall not be capped at a particular level in any fiscal year.

The change in the CPI from February 2023 to February 2024 was 2.37%. Therefore, the maximum authorized assessment rate for the Northeast Quadrant LMD fiscal year 2024-2025 is increased by 2.37% which equates to $583.98 per equivalent benefit unit for Zone A and $377.62 per equivalent benefit unit for Non-Zone A. The Engineer’s Report proposes assessments for fiscal year 2024-2025 at the rate of $444.20 per equivalent benefit unit for Zone A and $287.24 per equivalent benefit unit for Non-Zone A, which are less than the maximum authorized assessment rate.

Section 10. The Maximum Assessment Rate for South Vallejo Business Park LMD is equal to the Maximum Assessment Rate established for the previous fiscal year adjusted annually by the annual percentage change in the Consumer Price Index for All Urban Consumers (CPI-U), as distributed by the Bureau of Labor Statistics for the San Francisco-Oakland-San Jose Area.

The change in the CPI from February 2023 to February 2024 was 2.37%. Therefore, the maximum authorized assessment rate for the South Vallejo Business Park LMD fiscal year 2024-2025 is increased by 2.37% which equates to $4,450.55 per equivalent benefit unit. The Engineer’s Report proposes assessments for fiscal year 2024-2025 at the rate of $3,286.60, which is less than the maximum authorized assessment rate.

Section 11. That a duly noticed Public Hearing shall be held on June 11, 2024 at 7 p.m. in the City Council Chambers, located at 555 Santa Clara Street in Vallejo, California, to gather and consider public input and the ordering of the improvements and the levy of the proposed assessments.

Section 12. The City Clerk shall cause a notice of the hearing to be given by publishing a copy of this Resolution once, at least 10 days prior to the date of the hearing above specified, in a newspaper circulated in the City of Vallejo.

Adopted by the City Council of the City of Vallejo at a regular meeting held on May 28, 2024 with the following vote:

AYES:

NOES:

ABSENT:

ABSTAIN:
__________________________________
ROBERT H. MCCONNELL, MAYOR
ATTEST:
__________________________________
DAWN G. ABRAHAMSON, CITY CLERK
ENGINEER’S REPORT
City of Vallejo
Landscape Maintenance Districts
Fiscal Year 2024-25
Pursuant to the Landscaping and Lighting Act of
1972 and Article XIIID of the California Constitution
Page i
(This page intentionally left blank.)
Page ii
Table of Contents
Introduction................................................................................................................. 1 Overview.................................................................................................................................... 1 Assessment Process .................................................................................................................. 2 Engineer’s Report...................................................................................................................... 2 Assessment History ................................................................................................................... 3 Changes To The Landscape Maintenance Districts........................................................ 6 Plans & Specifications .................................................................................................. 7 Description of the Landscape Maintenance Districts.................................................... 9 Method of Apportionment......................................................................................... 48 Method of Apportionment...................................................................................................... 48 Discussion of Benefit............................................................................................................... 48 General versus Special Benefit................................................................................................ 51 Benefit Finding ........................................................................................................................ 52 Method of Assessment............................................................................................................ 55 Appeals and Interpretation ..................................................................................................... 58 Inflationary Adjustment .......................................................................................................... 58 Assessment................................................................................................................ 61 Appendix A - 2024-2025 Assessment Roll................................................................... 63 Appendix B - Assessment Diagram ............................................................................. 64 City of Vallejo
Landscape Maintenance Districts
Engineer’s Report, FY 2024-2025
Page iii
(This page intentionally left blank.)
City of Vallejo
Landscape Maintenance Districts
Engineer’s Report, FY 2024-2025

Page 1 ends

Introduction
Overview
The City of Vallejo (the “City”) annually levies and collects special assessments in order to maintain the improvements within the Landscape Maintenance Districts (“LMD” or “LMDs”). The LMDs have been formed pursuant to the Landscaping and Lighting Act of 1972, Part 2 of Division 15 of the California Streets and Highways Code (the “1972 Act”).

This document includes the Engineer’s Reports (the “Reports”) for twelve Landscape Maintenance Districts (hereafter referred to as “LMD” or “LMDs”) designated as:
 Bordoni Ranch LMD
 Carriage Oaks LMD
 Garthe Ranch LMD (Zone A and Zone B)
 Glen Cove III LMD
 Glen Cove III 2015 LMD
 Hunter Ranch III LMD
 Marine World/Fairgrounds Drive LMD
 Marin View LMD
 Northeast Quadrant LMD (Including Zone A)
 Sandpiper Point LMD
 South Vallejo Business Park LMD
 Town and Country II through V LMD
In an effort to streamline the annual administrative process and expenses, the annual Reports required for each LMD, pursuant to the 1972 Act, are incorporated into this single Report. This comprehensive Report address the overall legislative authority, benefit rationale and method of apportionment for the LMDs listed above and provides separately a more detailed description of each LMD’s boundaries, improvements, proposed budget and assessments for fiscal year 2024-2025 as required by Chapter 1, Article 4, beginning with Section 22565 of the 1972 Act.

City of Vallejo
Landscape Maintenance Districts
Engineer’s Report, FY 2024-2025

Page 2 ends

Assessment Process
This Report was prepared to establish the budgets for the continued capital improvement and services expenditures that would be funded by the proposed 2024-2025 assessments, determine the benefits received from the lighting and landscaping maintenance and improvements by property within the LMDs and the method of assessment apportionment to lots and parcels within the LMDS. This Report and the proposed assessments have been made pursuant to the provisions of the 1972 Act and Article XIIID of the California Constitution (the “Article”).

In each subsequent year for which the assessments will be continued, the Council must direct the preparation of an Engineer's Report, budgets and proposed assessments for the upcoming fiscal year. After the Engineer's Report is completed, the Council may preliminarily approve the Engineer's Report and proposed assessments and establish the date for a public hearing on the continuation of the assessments. This Report was prepared pursuant to the direction of the Council.

If the Council approves this Engineer's Report and the continuation of the assessments by resolution, a notice of assessment levies must be published in a local paper at least 10 days prior to the date of the public hearing. The resolution preliminarily approving the Engineer's Report and establishing the date for a public hearing is used for this notice.

Following the minimum 10-day time period after publishing the notice, a public hearing is held for the purpose of allowing public testimony about the proposed continuation of the assessments. This hearing is currently scheduled for June 11, 2024. At this hearing, the Council would consider approval of a resolution confirming the continuation of the assessments for fiscal year 2024-2025. If so confirmed and approved, the assessments would be submitted to the County Auditor/Controller for inclusion on the property tax rolls for Fiscal Year 2024-2025.

Engineer’s Report
SCI Consulting Group has been retained by the City as the Assessment Engineer for this Assessment since 2011-2012. Language taken from the previous Engineer's Report is shown in Times New Roman, 10 pt. Font.

City of Vallejo
Landscape Maintenance Districts
Engineer’s Report, FY 2024-2025

Page 3 ends

Assessment History
After the passage of Proposition 218 in November 1996 (now Articles XIIIC and XIIID of the California Constitution), the City conducted a complete analysis of the proposition and its application to the LMDs and the assessments related thereto. Pursuant to the Article XIIID Section 5 of the Constitution, certain existing assessments are exempt from the substantive and procedural requirements of Article XIIID Section 4 and property owner balloting for the assessments is not required until such time that the assessments are increased. Specifically, the City determined that the improvements and the annual assessment for each of the then existing 1972 Act Districts were part of the conditions of property development and approved by the original property owner (developer). As such, pursuant to Article XIIID Section 5b of the Constitution, the existing assessments were approved by all the property owners at the time the assessment was created (originally imposed pursuant to a 100% landowner petition) and therefore, the previously adopted assessments for each of those LMDs were exempt from the procedural requirements of the Article XIIID Section 4.

With the exception of the Bordoni Ranch LMD, Marine World/Fairgrounds LMD, Northeast Quadrant LMD, South Vallejo Business Park LMD, the Highlands at Garthe Ranch LMD (Garthe Ranch LMD Zone B) and Glen Cove III 2015 LMD which were balloted for a new or increased assessment that included an inflationary adjustment, each of the LMDs contained within this Report currently have fixed maximum assessment rates with no adjustment for inflation. Although these assessment rates (with the exception of Marin View LMD) were established prior to the passage of Proposition 218 and have been identified as exempt assessments pursuant to Article XIIID Section 5b of the Constitution, it has been determined that the current assessment revenues for most of these LMDs are no longer sufficient to cover the annual cost of providing the improvements.

Since the passage of Proposition 218, all new or increased assessments established for the LMDs and identified as the “Current Maximum Assessment Rate” in this Report have been submitted to the property owners of record and approved by such property owners pursuant to the provisions of the California Constitution Article XIIID Section 4.

Specifically:

The Marin View LMD was formed in fiscal year 1999-2000. As part of that formation process, the City conducted a property owner protest ballot proceeding for the proposed maximum assessment. The results of that balloting indicated that majority protest did not exist and the “Current Maximum Assessment Rate” identified in this Report for that LMD was approved and confirmed by the City Council. Although the maximum assessment for this LMD was approved through a property owner protest ballot proceeding, the maximum assessment established did not include an inflationary adjustment.

City of Vallejo
Landscape Maintenance Districts
Engineer’s Report, FY 2024-2025

Page 4 ends

Also in fiscal year 1999-2000, the City conducted property owner protest proceedings for a proposed assessment increase for the Northeast Quadrant LMD. The assessment increase (new maximum assessment) presented to the property owners in a property owner protest ballot proceeding and subsequently approved by those property owners, included an annual inflationary adjustment for the assessments.

In fiscal year 2007-2008 the City conducted proceedings for the formation of the Highlands at Garthe Ranch Maintenance District and concurrently annexed the properties within this LMD to the existing Garthe Ranch LMD as Zone B. As part of the formation/annexation process the City conducted a property owner protest ballot proceeding on the proposed new assessment for the associated improvements. The new maximum assessment presented to the property owners of record and subsequently approved also included an annual inflationary adjustment for the assessments.

In fiscal year 2008-2009 the City conducted property owner protest proceedings for a proposed assessment increase for eight of the LMDs outlined in this Report. These eight LMDs included:
 Carriage Oaks LMD
 Garthe Ranch LMD (Zone A only)
 Glen Cove III LMD
 Hunter Ranch III LMD
 Marine World/Fairgrounds Drive LMD
 Sandpiper Point LMD
 South Vallejo Business Park LMD
 Town and Country II through V LMD
In addition to the proposed assessment rate increases, the City proposed the implementation of an annual inflation adjustment for those new maximum assessment rates. In connection with the proposed assessment increases, pursuant to the provisions of the California Constitution, Article XIIID Section 4, the City conducted a property owner protest ballot proceeding for the establishment of the proposed new maximum assessments and inflationary adjustment for each respective LMD prior to imposing such new assessments.

The tabulation of the ballots indicated that majority protest did not exist for the proposed new or increased assessment for the following two LMDs only:
 Marine World/Fairgrounds Drive LMD
 South Vallejo Business Park LMD
City of Vallejo
Landscape Maintenance Districts
Engineer’s Report, FY 2024-2025

Page 5 ends

In fiscal year 2010-2011, the City conducted a property owner ballot proceeding for a proposed new assessment for the Bordoni Ranch LMD. The new assessment presented to the property owners in a ballot proceeding and subsequently approved by those property owners included an annual inflationary adjustment for the assessments.

In fiscal year 2015-2016, the City conducted a property owner ballot proceeding for a proposed new assessment in the Glen Cove III area, Glen Cove III 2015 LMD (Glen Cove III District 2). The new assessment presented to the property owners in a ballot proceeding and subsequently approved by those property owners included an annual inflationary adjustment for the assessments.

City of Vallejo
Landscape Maintenance Districts
Engineer’s Report, FY 2024-2025

Page 6 ends

Changes To The Landscape Maintenance Districts
Changes within the LMDs that affect the 2024-2025 levy of assessments are outlined below.

Annexations
No new annexations have occurred since the fiscal year 2023-2024 Engineer’s Report was approved.

New Landscape Maintenance Districts
No new LMDs have been formed since the fiscal year 2023-2024 Engineer’s Report was approved.

City of Vallejo
Landscape Maintenance Districts
Engineer’s Report, FY 2024-2025

Page 7 ends

Plans & Specifications
The LMDs provide maintenance of landscaping and lighting within the public right-of-way, dedicated landscape easements, parks, detention basins, and street lighting (the “Improvements”) in the various LMDs throughout the City. Each LMD has differing costs and provides direct and special benefits to the parcels within these LMDs. All properties will be assessed only for the maintenance of improvements within their respective LMD.

Improvements within the LMDs include but are not limited to: installation, maintenance and servicing of public facilities, and incidental expenses, including but not limited to, street lights, public lighting facilities, landscaping, sprinkler systems, statuary, fountains, other ornamental structures and facilities, landscape corridors, ground cover, shrubs and trees, street frontages, drainage systems, fencing, entry monuments, graffiti removal and repainting, and labor, materials, supplies, utilities and equipment, as applicable, for property owned or maintained by the City of Vallejo. Any plans and specifications for these improvements will be filed with the Public Works Director of the City of Vallejo and are incorporated herein by reference.

Installation means the construction of lighting and landscaping improvements, including, but not limited to: land preparation, such as grading, leveling, cutting and filling, sod, landscaping, irrigation systems, sidewalks and drainage and lights.

Maintenance means the furnishing of services and materials for the ordinary and usual maintenance, operation and servicing of any improvement, including repair, removal or replacement of all or any part of any improvement; providing for the life, growth, health, and beauty of landscaping, including cultivation, irrigation, trimming, spraying, fertilizing, or treating for disease or injury; the removal of trimmings, rubbish, debris, and other solid waste, and the cleaning, sandblasting, and painting of walls and other improvements to remove or cover graffiti.

Servicing means the furnishing of electric current or energy for the operation or lighting of any improvements, and water for irrigation of any landscaping or the maintenance of any other improvements.

City of Vallejo
Landscape Maintenance Districts
Engineer’s Report, FY 2024-2025

Page 8 ends

Incidental expenses include all of the following: (a) The costs of preparation of the report, including plans, specifications, estimates, diagram, and assessment; (b) the costs of printing, advertising, and the giving of published, posted, and mailed notices; (c) compensation payable to the County for collection of assessments; (d) compensation of any engineer or attorney employed to render services in proceedings pursuant to this part; (e) any other expenses incidental to the construction, installation, or maintenance and servicing of the Improvements; (f) any expenses incidental to the issuance of bonds or notes pursuant to Streets & Highways Code Section 22662.5; and (g) costs associated with any elections held for the approval of a new or increased assessment. (Streets & Highways Code §22526).

The assessment proceeds will be exclusively used for Improvements within the LMDs plus Incidental expenses.

City of Vallejo
Landscape Maintenance Districts
Engineer’s Report, FY 2024-2025

Page 9 ends

Description of the Landscape Maintenance Districts
Landscape Maintenance District Boundaries, Specific Areas Maintained and Fiscal Year 2024-2025 Estimate of Cost and Budgets
A description of the boundaries, areas maintained, Improvements and FY 2024-25 Budgets are described in detail below for each LMD.

BORDONI RANCH LMD
This LMD is designated as Bordoni Ranch Landscape Maintenance District and may be referred to as Bordoni Ranch LMD. Bordoni Ranch LMD was formed in 2010. The LMD serves two Zones:

Zone 1 is comprised of all parcels of land within the Bordoni Ranch subdivision, as well as the two parcels on the west side of Columbus Parkway that are the proposed site of the planned detention basin/wetlands;
Zone 2 is comprised of the remaining three parcels of land on the west side of Columbus Parkway that are proposed to be future residential subdivisions, including the planned Tuscany subdivision.

Boundaries
Zone 1 consists of all lots, parcels and subdivisions of land within the proposed residential subdivision known as Bordoni Ranch, generally located east of and adjacent to Columbus Parkway and south of Regents Park Drive and Brunswick Drive. Zone 1 also includes the two parcels that are the site of the proposed detention basin as well as vacant wetlands.

These two parcels are generally located west of and adjacent to Columbus Parkway, and north of Benicia Road, and south of Greenmont Drive.

Zone 2 consists of all lots, parcels and subdivisions of land within the proposed residential subdivision known as Tuscany as well as vacant land and two parcels zoned for residential development (future single-family residential subdivisions). These properties are generally located west of and adjacent to Columbus Parkway; and north of Greenmont Drive, and south of Aragon Street.

City of Vallejo
Landscape Maintenance Districts
Engineer’s Report, FY 2024-2025

Page 10 ends

Improvements
The LMD maintains landscape improvements, open space areas and park facilities. It has been determined that specific improvements to be maintained throughout the LMD are improvements that provide special benefits to each property within the LMD, the cost of which will be proportionately shared by properties in both Zone 1 and Zone 2 (“Shared Improvements”). Conversely, other improvements to be maintained throughout the LMD that are specifically the result of developing properties within the Bordoni Ranch residential subdivisions are improvements that provide special benefits to only those properties, and the cost of providing such improvements shall be proportionately shared by only the properties in Zone 1 (“Zone 1 Improvements”). Therefore, Zone 1 receives benefits from both the Zone 1 Improvements and the Shared Improvements while Zone 2 receives benefits only from the Shared Improvements. The Improvements to be maintained throughout the LMD are generally described as:

Zone 1 Improvements
 Irrigated parkways and slopes (streetscape) within the public right-of-ways on the perimeter of the Bordoni Ranch subdivision, including but not limited to:
o Landscaped area located on the east side of Columbus Parkway, from Regents Park Drive southward to the southern end of the Bordoni Park subdivision;
o Landscaped area and approximately 19 street trees located on the south side of Regents Park Drive, from Columbus Parkway eastward to approximately 50 feet west of Brunswick Drive;
o Landscaped area, including approximately 54 street trees on both sides of Waterstone Parkway between Regents Park Drive and Abbey Drive.
 Irrigated open space areas and wetlands dispersed throughout the Bordoni Ranch subdivision that provide a transition from the streetscape landscaped areas to the non-irrigated open space areas, and/or are located adjacent to the residential units or common areas within the Bordoni Ranch subdivision.  Detention basin serving the Bordoni Ranch development.

Shared Improvements
 Landscaped median islands on Columbus Parkway, approximately between Regents Park Drive on the north and Benicia Road on the south.  Designated parkland, located at the corner of Columbus Parkway and Regents Park Drive. The park includes, but is not limited to:
o One basketball court;
o Two bocce courts;
o Toddler’s play structure;
City of Vallejo
Landscape Maintenance Districts
Engineer’s Report, FY 2024-2025

Page 11 ends

o Older children’s play structure;
o Picnic areas with tables, barbeques, and benches;
o A 21-stall parking lot.

General Information
Prior to the Bordoni Ranch development, there was a 6.74 acre park located on the south side of Regents Park Drive just east of Columbus Parkway. This park had very few amenities and consisted primarily of grass, trees and sidewalks. The park was maintained by the Greater Vallejo Recreation District (the “GVRD”). In anticipation of the increased demand to be placed on the park by the Developments, the previous park was demolished and a new park was completely reconstructed and enhanced as described above. Fiscal Year 2024-2025 planning and redesign of the bathroom facilities are planned for completion.

LMD Budgets
The following provides the budget and maximum assessment rates for each Zone for fiscal year 2024-25.

City of Vallejo
Landscape Maintenance Districts
Engineer’s Report, FY 2024-2025

Page 12 ends

Direct Costs Zone 01 Zone 02
2024-25
Budget
Contract Maintenance Costs $43,251 $973 $44,224
Salaries & Benefits $41,802 $940 $42,742
Services & Supplies $5,183 $117 $5,300
Landscape Water $48,900 $1,100 $50,000
Utilities $1,565 $35 $1,600
Landscape Rehabilitation / Vandalism $9,780 $220 $10,000 Capital Projects $0 $0 $0
Total Direct Costs $150,481 $3,385 $153,866
Administration Costs
Administration & Overhead $24,947 $561 $25,508
County Administration Fees $1,690 $38 $1,728
Professional Fees $963 $22 $985
Total Administration Costs $27,600 $621 $28,221
Collections / (Credits) Applied To Levy
Total Direct and Administration Costs $178,081 $4,006 $182,087 Contribution to / (from) Reserve Fund $0 $0 $0
Contribution to / (from) Rehabilitation Fund ($5,329) ($122) ($5,451) Contribution (from) General Fund / Other Revenue ($3,766) ($85) ($3,851) Balance to Levy $168,986 $3,799 $172,785
District Statistics
Total Parcels 259 3 262
Total Parcels Levied 244 3 247
Total Equivalent Benefit Units 430.00 14.05 444.05
Proposed Levy per Benefit Unit $392.99 $270.33
Maximum Levy per Benefit Unit $753.49 $517.82
Total Assessment Levy $168,985.70 $3,798.14 $172,783.84 Fund Balance Information
Beginning Operating Reserve Fund Balance $89,040.46 $2,002.96 $91,043.42 Operating Reserve Fund Adjustments $0.00 $0.00 $0.00
Anticipated Operating Reserve Fund Balance $89,040.46 $2,002.96 $91,043.42 Beginning Rehabilitation Reserve Fund Balance $287,628.41 $6,470.17 $294,098.58 Rehabilitation Reserve Fund Adjustments ($5,329.00) ($122.00) ($5,451.00) Anticipated Rehabilitation Reserve Fund Balance $282,299.41 $6,348.17 $288,647.58 Anticipated Total Ending Fund Balance $371,339.87 $8,351.13 $379,691.00 Estimate of Cost
City of Vallejo
Bordoni Ranch Landscape Maintenance District
Fund Number (#177)
City of Vallejo
Landscape Maintenance Districts
Engineer’s Report, FY 2024-2025

Page 13 ends

Carriage Oaks LMD
This LMD is designated as Carriage Oaks Landscape Maintenance District and may be referred to as Carriage Oaks LMD. Carriage Oaks LMD was formed in 1990. The LMD serves a residential neighborhood of 254 parcels located in northeast Vallejo.

Boundaries
The LMD lies within the City of Vallejo, generally located within the area bounded by Interstate 80, State Route 37, the Country Club Crest Ranch and Cimarron Hills Subdivisions.

Improvements
The LMD maintains landscaped areas and weed control zones including approximately 1 acre of ornamental and native landscaping which includes ground cover, shrubbery and trees; and 10 acres of plantings and weed control described as follows:
 Remove & replace over-mature shrubs on Borges slopes
 Thin out over-mature vegetation at Griffin & Sousa
 The landscape areas from Cimarron Court to Souza
 The strip of weed height control along the Marine World Parkway sound wall and the open space below, to the west of Highway 80
 Weed height control for open space areas
 Prune trees in LMD easements
 Upgrade irrigation on slopes along Borges
General Information
Slope drainage from Highway 80 is highly erosive to the open space area and has significantly impacted the LMD costs over the last few years. Although repairs due to erosion cannot be predicted, it is essential that the LMD’s Rehabilitation Fund be adequately funded for any unforeseen repairs or replacements.

The life expectancy of native shrubbery is five to fifteen years. The majority of the current landscape improvements (shrubbery) within the LMD will likely need replacement over the next several years.

City of Vallejo
Landscape Maintenance Districts
Engineer’s Report, FY 2024-2025

Page 14 ends

A financial analysis of the LMD indicates that the current maximum assessment revenues do not generate adequate revenue to provide for the Improvements. The City conducted proceedings in fiscal year 2008-2009 to ballot the property owners within the LMD for an increased assessment and an annual inflationary adjustment commencing in fiscal year 2008-2009, which was not approved. This has resulted in a continued reduction in the levels of service including, reduced irrigation service, reduction in the frequency of maintenance services and postponement of capital improvement projects.

LMD Budget
The following provides the budget and maximum assessment rate for fiscal year 2024-25.

City of Vallejo
Landscape Maintenance Districts
Engineer’s Report, FY 2024-2025

Page 15 ends

Direct Costs 2024-25 Budget
Contract Maintenance Costs $4,551
Salaries & Benefits $1,838
Services & Supplies $228
Landscape Water $0
Utilities $0
Landscape Rehabilitation / Vandalism $0
Capital Projects $0
Total Direct Costs $6,617
Administration Costs
Administration & Overhead $1,097
County Administration Fees $149
Professional Fees $85
Total Administration Costs $1,331
Collections / (Credits) Applied To Levy
Total Direct and Administration Costs $7,948
Contribution to / (from) Reserve Fund $0
Contribution to / (from) Rehabilitation Fund $6,966
Contribution (from) General Fund / Other Revenue ($50)
Balance to Levy $14,864
District Statistics
Total Parcels 254
Total Parcels Levied 254
Total Equivalent Benefit Units 254.00
Proposed Levy per Benefit Unit $58.52
Maximum Levy per Benefit Unit $58.52
Total Assessment Levy $14,864.08
Fund Balance Information
Beginning Operating Reserve Fund Balance $3,973.82
Operating Reserve Fund Adjustments $0.00
Anticipated Operating Reserve Fund Balance $3,973.82
Beginning Rehabilitation Reserve Fund Balance $1,035.18 Rehabilitation Reserve Fund Adjustments $6,966.00
Anticipated Rehabilitation Reserve Fund Balance $8,001.18 Anticipated Total Ending Fund Balance $11,975.00
Estimate of Cost
City of Vallejo
Carriage Oaks Landscape Maintenance District
Fund Number 7720 (#170)
City of Vallejo
Landscape Maintenance Districts
Engineer’s Report, FY 2024-2025

Page 16 ends

Garthe Ranch LMD
This LMD is designated as Garthe Ranch Landscape Maintenance District and may be referred to as Garthe Ranch LMD. The LMD is comprised of two Zones:
 Zone A (the original Garthe Ranch LMD) was formed in 1987 and serves a residential neighborhood consisting of 1,145 parcels within thirteen developments located in southeast Vallejo; and
 Zone B (the Highlands) was formed and established in October 2006 and serves a residential development consisting of 105 parcels situated in the eastern portion of the City of Vallejo.

Boundaries
Zone A of the LMD is generally located within the areas bounded by Columbus Parkway, Lake Herman Road, the Vallejo-Benicia city limits line, the Springtree/Fleming Hill LMD, Tennessee Street, Saint Catherine's Church, and the Summit I and Somerset Highlands III Landscape Maintenance Districts.

Zone B is generally located east of and adjacent to Columbus Parkway at Spring Road, south and west of Ascot Parkway, and north of Georgia Street.

Improvements
Zone A - The LMD maintains landscaped areas, weed control zones and trail systems for the special benefit of properties within Zone A including approximately 30 acres of native and ornamental ground cover, shrubbery and trees; 31 acres of plantings and weed control that are found in the following areas:
 The Ascot Parkway frontage which extends eastward to Newcastle Drive  The Georgia Street frontage extending to Ascot Parkway  Hilary Way between Columbus and Ascot Parkways
 The Columbus Parkway slopes below the Coventry Hills subdivision and Highland Apartments
 The frontages along Windsor, Westminster, Southport, and Ramsgate Ways The open space areas behind the residences of Ascot Parkway, Britannia Drive, Hawkins Street, Southport Way, Georgia Street, Knights Circle, Devonshire and Joel Courts, Devonshire Avenue, Manor Court, Newcastle Drive, Newcastle Court, Windsor and Westminster Ways, Sandhurst Drive, Sandhurst Court, and Saxony Court.

Zone B - The LMD maintains landscaped areas, weed control zones and parkland for the special benefit of properties within Zone B including:

City of Vallejo
Landscape Maintenance Districts
Engineer’s Report, FY 2024-2025

Page 17 ends

 Approximately one acre of irrigated parkways and slopes (streetscape) within the public right-of-ways along the interior streets of the Zone.  Approximately half of an acre of irrigated open space areas that provide a transition from the streetscape landscaped areas to the non-irrigated open spaces areas, and/or are located adjacent to the residential units or common areas within the Highlands subdivision.
 Approximately one and a half acres of irrigated parkways and slopes (streetscape) on the perimeter of the Zone.
 Approximately 25 acres of non-irrigated (natural) open space area located in the eastern half of the Zone behind the residential subdivision.

A half-acre park site is located in the center of the residential subdivision.

General Information
The life expectancy of native shrubbery is five to fifteen years. Although portions of the assessments for Zone A have been spent on rehabilitation in recent years, it is reasonable to assume that additional monies will be necessary in future years for either more rehabilitation of the improvements (particularly irrigation systems) or increased maintenance costs associated with very mature plant material.

LMD Budgets
Zone A Budget
A financial analysis of the LMD and the improvements indicates that the current maximum assessment rate does not generate sufficient revenues to adequately provide for the improvements. The City conducted proceedings in fiscal year 2008-09 to ballot the property owners within the LMD for an increased assessment and an annual inflationary adjustment commencing in fiscal year 2008-09 which was not approved. This has resulted in a continued reduction in the levels of service including, reduced irrigation service, reduction in the frequency of maintenance services and postponement of capital improvement projects.

The following provides the budget and maximum assessment rate for fiscal year 2024-25.

City of Vallejo
Landscape Maintenance Districts
Engineer’s Report, FY 2024-2025

Page 18 ends

Direct Costs 2024-25 Budget
Contract Maintenance Costs $49,000
Salaries & Benefits $34,586
Services & Supplies $4,289
Landscape Water $33,430
Utilities $3,200
Landscape Rehabilitation / Vandalism $0
Capital Projects $0
Total Direct Costs $124,505
Administration Costs
Administration & Overhead $20,640
County Administration Fees $1,783
Professional Fees $1,016
Total Administration Costs $23,439
Collections / (Credits) Applied To Levy
Total Direct and Administration Costs $147,944
Contribution to / (from) Reserve Fund $20,014
Contribution to / (from) Rehabilitation Fund $10,923
Contribution (from) General Fund / Other Revenue ($540) Balance to Levy $178,341
District Statistics
Total Parcels 1145
Total Parcels Levied 1138
Total Equivalent Benefit Units 1388.31
Proposed Levy per Benefit Unit $128.46
Maximum Levy per Benefit Unit $128.46
Total Assessment Levy $178,342.30
Fund Balance Information
Beginning Operating Reserve Fund Balance $53,958.00
Operating Reserve Fund Adjustments $20,014.21
Anticipated Operating Reserve Fund Balance $73,972.21
Beginning Rehabilitation Reserve Fund Balance $0.00
Rehabilitation Reserve Fund Adjustments $10,922.79
Anticipated Rehabilitation Reserve Fund Balance $10,922.79 Anticipated Total Ending Fund Balance $84,895.00
Estimate of Cost
City of Vallejo
Garthe Ranch Landscape Maintenance District
Fund Number 7716 (#180)
City of Vallejo
Landscape Maintenance Districts
Engineer’s Report, FY 2024-2025

Page 19 ends

Zone B Budget
Zone B (Highlands) was formed and balloted for a new assessment in fiscal year 2006-07, which included an annual inflationary.

The following provides the proposed budget and assessment rate for fiscal year 2024-25 that is necessary to provide an appropriate level of maintenance for the Highlands (Zone B) of the LMD. The budget includes the City’s estimate of anticipated expenditures, revenues and fund balances required for the annual maintenance and operation of the improvements. The assessment rate derived from this budget and the established method of apportionment shall be used to calculate each parcel’s assessments for fiscal year 2024-25.

City of Vallejo
Landscape Maintenance Districts
Engineer’s Report, FY 2024-2025

Page 20 ends

Direct Costs 2024-25 Budget
Contract Maintenance Costs $26,099
Salaries & Benefits $31,342
Services & Supplies $3,887
Landscape Water $35,000
Utilities $1,500
Landscape Rehabilitation / Vandalism $15,000
Capital Projects $0
Total Direct Costs $112,828
Administration Costs
Administration & Overhead $18,705
County Administration Fees $2,179
Professional Fees $1,242
Total Administration Costs $22,126
Collections / (Credits) Applied To Levy
Total Direct and Administration Costs $134,954
Contribution to / (from) Reserve Fund $0
Contribution to / (from) Rehabilitation Fund $102,028
Contribution (from) General Fund / Other Revenue ($19,063) Balance to Levy $217,919
District Statistics
Total Parcels 105
Total Parcels Levied 105
Total Equivalent Benefit Units 105.00
Proposed Levy per Benefit Unit $2,075.42
Maximum Levy per Benefit Unit $2,786.47
Total Assessment Levy $217,919.10
Fund Balance Information
Beginning Operating Reserve Fund Balance $67,477.10
Operating Reserve Fund Adjustments $0.00
Anticipated Operating Reserve Fund Balance $67,477.10
Beginning Rehabilitation Reserve Fund Balance $1,838,819.90 Rehabilitation Reserve Fund Adjustments $102,028.00
Anticipated Rehabilitation Reserve Fund Balance $1,940,847.90 Anticipated Total Ending Fund Balance $2,008,325.00
Estimate of Cost
City of Vallejo
Garthe Ranch Highland (Zone B) Landscape Maintenance District Fund Number 7746 (#188)
City of Vallejo
Landscape Maintenance Districts
Engineer’s Report, FY 2024-2025

Page 21 ends

Glen Cove III LMD’s
The Glen Cove III area has two Landscape Maintenance Districts, the first LMD is designated as Glen Cove III LMD or “LMD 1”, was formed in 1987. LMD 1 serves an area consisting of 2,936 parcels from twenty-eight (28) developments located in southeast Vallejo.

The second Landscape Maintenance District was formed by property owner ballot proceeding fiscal year 2015-16 and is designated as Glen Cove III 2015 LMD or “LMD 2”.

LMD 2 serves the same area as LMD 1 and contains 3,219 parcels from twenty-eight (28) developments located in southeast Vallejo. LMD 2 contains slightly more parcels than LMD 1, due to its formation occurring after the implementation of Proposition 218, public agencies are subject to LMD 2 assessments.

LMD 2 was formed in order to provide additional funding for the maintenance and installation of landscape improvements throughout the Glen Cove III area. LMD 1 was formed in 1987 without an inflationary adjustment while costs have increased significantly. As a result, the assessment revenue from LMD 1 was no longer sufficient to fund annual maintenance and would have depleted the rehabilitation reserve fund.

The development of properties within both LMD’s is not expected to change significantly.

Boundaries
Both LMD’s lies within the City of Vallejo, generally located within the area bounded by Interstate 80, Interstate 780, Robles Way and the Benicia State Recreation Area.

LMD 2 Zones of Benefit
As part of the engineering work for the formation of LMD 2, an analysis was conducted on the relationship (including proximity, transportation corridors, likely travel routes, etc.), between properties and the primary improvements located along Glen Cove Parkway. As a results three zones, A, B and C were created as shown on the assessment diagram for LMD 2. Parcels in Zone B are determined to receive 98% of the level of special benefit as those within Zone A and parcels in Zone C are determined to receive 94% of the level of special benefit as those within Zone A.

Improvements
The LMD’s maintain landscaped areas; weed control zones; and trail systems including approximately 60 acres of ornamental and native landscaping which includes ground cover, shrubbery, and trees; and 62 acres of plantings and weed control that are found in the following areas:

City of Vallejo
Landscape Maintenance Districts
Engineer’s Report, FY 2024-2025

Page 22 ends

 The boundaries of Robles to the straits and Navone/Palou/Old Glen Cove Road to the Benicia State Recreation Area fence-line and Glen Cove Parkway  Mistral, Rivermouth, Brigantine, James River, New Bedford Court, Bear Cove Court, Pueblo Court, Duxbury Place, Sandy Neck Way, Sea Cliff Place, Saybrook Way, Antigua Way, and Chesapeake Drive
 Glen Cove Parkway beginning at the west corner of the Marina Complex landscape area fronting the parkway to the intersection of Glen Cove Parkway and Bayside Terrace
 The open space to the west and north of Waterview Terrace  The slope of Clearview including the slope and trail along the strait to the entrance of the harbor
 South Regatta from the intersection of Glen Cove Parkway to the intersection of Whiteside and South Regatta
 The open space between Paddlewheel, Beston, Ancheta, Topsail, Yachtsman, and Seafarer
 Weed control adjacent to the Benicia State Park fence-line and the PG&E yard to the intersection of Flying Dutchman
 The open space above Weathermark, Leeward, and Windward Courts  The open space slope of Flying Dutchman, Pirates’ Cove, Sea Mist, Topsail, Helmsman, Anchor, Winter Harbor, Wellfleet, Cape Elizabeth, Fairhaven, and Silver Pine to the Benicia State Park fence
 The Hwy. 780 fence-line along the northeast boundary of the LMD  The access pathway behind Topsail and the landscaping along each side of North Regatta to the intersection of Glen Cove Parkway and North Regatta  The north side of Sunfish Court
 Outrigger near Sea Horse and the open space to the rear yard fences of Palou and Pueblo
 The open space above Del Sur in the cul-de-sac, above Clearpointe, and the open space above and below the Clearpointe Drive cul-de-sac
General Information
The life expectancy of native shrubbery is five to fifteen years.

Fiscal Year 2023-24 community engagement and work with consultants on design of Glen Cove Parkway Project including next phases / scope of work / construction documents / budget / timelines.

Fiscal Year 2024-25 Glen Cove Parkway Project - bid project and start construction base on design plans created from Fiscal Year 2023-24 planning and design process.

City of Vallejo
Landscape Maintenance Districts
Engineer’s Report, FY 2024-2025

Page 23 ends

The City conducted proceedings in fiscal year 2008-2009 to ballot the property owners within the LMD for an increased assessment and an annual inflationary adjustment commencing in fiscal year 2008-2009 which was not approved. The City conducted a second property owner ballot proceeding in fiscal year 2015-16 for a new assessment and an annual inflationary adjustment commencing in fiscal year 2015-16 which was approved. As noted previously the new LMD is designated as Glen Cove III 2015 LMD or “LMD 2”.

Including the annual inflationary adjustment maximum assessment rates for LMD 2 for fiscal year 2024-25 are $134.69 for properties in Zone A, $132.02 for properties in Zone B, and $126.60 for properties in Zone C.

LMD Budget
The following provides the budget and maximum assessment rate for fiscal year 2024-25.

City of Vallejo
Landscape Maintenance Districts
Engineer’s Report, FY 2024-2025

Page 24 ends

Direct Costs
2024-25 Glen
Cove III LMD 1
2024-25
Glen Cove III
LMD 2 (2015)
2024-25 Glen
Cove III Total
Budget
Contract Maintenance Costs $179,585 $136,585 $316,170
Salaries & Benefits $106,027 $80,641 $186,668
Services & Supplies $13,149 $10,000 $23,149
Landscape Water $51,120 $38,880 $90,000
Utilities $3,408 $2,592 $6,000
Landscape Rehabilitation / Vandalism $28,400 $21,600 $50,000 Capital Projects $56,800 $43,200 $100,000
Total Direct Costs $438,489 $333,498 $771,987
Administration Costs
Administration & Overhead $63,276 $48,126 $111,402
County Administration Fees $4,644 $3,532 $8,176
Professional Fees $2,645 $2,012 $4,657
Total Administration Costs $70,566 $53,669 $124,235
Collections / (Credits) Applied To Levy
Total Direct and Administration Costs $509,054 $387,168 $896,222 Contribution to / (from) Reserve Fund $0 $0 $0
Contribution to / (from) Rehabilitation Fund ($35,858) ($27,310) ($63,168) Contribution (from) General Fund / Other Revenue ($8,788) ($6,683) ($15,471) Balance to Levy $464,408 $353,174 $817,583
District Statistics
Total Parcels 3188 3219
Total Parcels Levied 3188 3075
Total Equivalent Benefit Units Zone A 2993.48 2169.21
Total Equivalent Benefit Units Zone B 271.25
Total Equivalent Benefit Units Zone C 199.00
Proposed Levy per Benefit Unit Zone A $155.14 $134.69
Proposed Levy per Benefit Unit Zone B $132.02
Proposed Levy per Benefit Unit Zone C $126.60
Total Assessment Levy $464,408.49 $353,174.72 $817,583.21 Fund Balance Information
Beginning Operating Reserve Fund Balance $254,527.11 $193,583.81 $448,110.92 Operating Reserve Fund Adjustments $0.00 $0.00 $0.00
Anticipated Operating Reserve Fund Balance $254,527.11 $193,583.81 $448,110.92 Beginning Rehabilitation Reserve Fund Balance $624,201.37 $474,744.71 $1,098,946.08 Rehabilitation Reserve Fund Adjustments ($35,858.20) ($27,309.80) ($63,168.00) Anticipated Rehabilitation Reserve Fund Balance $588,343.18 $447,434.90 $1,035,778.08 Anticipated Total Ending Fund Balance $842,870.29 $641,018.71 $1,483,889.00 City of Vallejo
Glen Cove III Landscape Maintenance Districts
Fund Number 7717 & 7748 (#185)
Estimate of Cost
City of Vallejo
Landscape Maintenance Districts
Engineer’s Report, FY 2024-2025

Page 25 ends

Hunter Ranch III LMD
This LMD is designated as Hunter Ranch III Landscape Maintenance District and may be referred to as Hunter Ranch III LMD.
 Hunter Ranch III LMD was formed in 1986
 The LMD serves a residential neighborhood of 190 parcels located in northeast Vallejo and the development of properties within the LMD is not expected to change significantly.

Boundaries
The LMD lies within the City of Vallejo, generally located within the area bounded by Turner, Ascot and Redwood Parkways and the Hunter Ranch I subdivision.

Improvements
The LMD maintains landscaped areas totaling approximately 6 acres of ornamental and native landscaping which includes ground cover, shrubbery, trees, and weed control zones that are found in the following areas:
 The west side of lower Ascot Parkway beginning at the south end of the sound wall at Sterling and Ascot Parkways to the intersection of Redwood Parkway and Ascot Parkway
 The slope landscaping along the north side of Redwood Parkway extending to the Trotter intersection, including three median islands on Redwood Parkway General Information
A FY 2008-2009 owner balloting to increase the assessment in the LMD to enable a full level of service failed and as a result the City reduced the Direct Costs of the LMD by renegotiating the landscape maintenance contracts (reduced level of service) and less frequent water use in an attempt to bring the annual expenses in line with the assessment revenues.

A financial analysis of the LMD and the improvements indicates that the current maximum assessment rate does not generate sufficient revenues to adequately provide for the improvements.

LMD Budget
The following provides the budget and maximum assessment rate for fiscal year 2024-25.

City of Vallejo
Landscape Maintenance Districts
Engineer’s Report, FY 2024-2025

Page 26 ends

Direct Costs 2024-25 Budget
Contract Maintenance Costs $3,183
Salaries & Benefits $3,305
Services & Supplies $410
Landscape Water $0
Utilities $0
Landscape Rehabilitation / Vandalism $5,000
Capital Projects $0
Total Direct Costs $11,898
Administration Costs
Administration & Overhead $1,972
County Administration Fees $137
Professional Fees $78
Total Administration Costs $2,187
Collections / (Credits) Applied To Levy
Total Direct and Administration Costs $14,085
Contribution to / (from) Reserve Fund $0
Contribution to / (from) Rehabilitation Fund $350
Contribution (from) General Fund / Other Revenue ($747) Balance to Levy $13,688
District Statistics
Total Parcels 190
Total Parcels Levied 190
Total Equivalent Benefit Units 190.00
Proposed Levy per Benefit Unit $72.04
Maximum Levy per Benefit Unit $72.04
Total Assessment Levy $13,687.60
Fund Balance Information
Beginning Operating Reserve Fund Balance $7,042.44
Operating Reserve Fund Adjustments $0.00
Anticipated Operating Reserve Fund Balance $7,042.44
Beginning Rehabilitation Reserve Fund Balance $67,658.56 Rehabilitation Reserve Fund Adjustments $350.00
Anticipated Rehabilitation Reserve Fund Balance $68,008.56 Anticipated Total Ending Fund Balance $75,051.00
Estimate of Cost
City of Vallejo
Hunter Ranch III Landscape Maintenance District
Fund Number 7714 (#183)
City of Vallejo
Landscape Maintenance Districts
Engineer’s Report, FY 2024-2025

Page 27 ends

Marine World/Fairgrounds Drive LMD
This LMD is designated as Marine World/Fairgrounds Drive Landscape Maintenance District and may be referred to as Marine World/Fairgrounds Drive LMD or Marine World/Fairground LMD.
 Marine World/Fairgrounds Drive LMD was formed in 1989.  The LMD serves 5 parcels that include a recreational theme park, fairgrounds, and motel/hotel complex (Holiday Inn) located in northeast Vallejo. Marine World/Fairgrounds Drive LMD is fully developed and the Equivalent Benefit Units (EBU) for the LMD is not expected to change.

Boundaries
The LMD lies within the City of Vallejo, generally located within the area bounded by Interstate 80, Fairgrounds Drive, and the western boundary of Marine World and the southern boundary of Solano County.

Improvements
The LMD maintains the landscaped frontages and median plantings totaling approximately 3 acres of native and ornamental ground cover, shrubbery and trees; and

0.5 acre of weed control and new plantings. Fairgrounds Drive serves as the entrance to the Discovery Kingdom (Formerly Marine World) Six Flags Theme Park and Solano County Fairgrounds and the LMD improvements are generally located in the areas described below:
 Just beyond the entrance to the Fairgrounds parking lot to the south; and  North beyond the overpass of Highway 37
General Information
The life expectancy of native shrubbery is five to fifteen years.

A past financial analysis of the LMD and the improvements indicated that the maximum assessment rate did not generate sufficient revenues to adequately provide for the improvements. The City conducted proceedings in FY 2008-2009 to ballot the property owners within the LMD for an increased assessment and an annual inflationary adjustment commencing in fiscal year 2008-2009 which was approved.

City of Vallejo
Landscape Maintenance Districts
Engineer’s Report, FY 2024-2025

Page 28 ends

LMD Budget
A financial analysis of the LMD with the inflationary adjustments indicates that the maximum assessment rate does generate sufficient revenues to adequately provide for improvements. The budget includes the City’s estimate of anticipated expenditures, revenues and fund balances required for the annual maintenance and operation of the improvements. The assessment rate derived from this budget and the established method of apportionment shall be used to calculate each parcel’s assessments for fiscal year 2024-25.

City of Vallejo
Landscape Maintenance Districts
Engineer’s Report, FY 2024-2025

Page 29 ends

Direct Costs 2024-25 Budget
Contract Maintenance Costs $22,978
Salaries & Benefits $27,981
Services & Supplies $3,470
Landscape Water $20,000
Utilities $1,300
Landscape Rehabilitation / Vandalism $25,000
Capital Projects $0
Total Direct Costs $100,729
Administration Costs
Administration & Overhead $16,699
County Administration Fees $1,060
Professional Fees $603
Total Administration Costs $18,362
Collections / (Credits) Applied To Levy
Total Direct and Administration Costs $119,091
Contribution to / (from) Reserve Fund $0
Contribution to / (from) Rehabilitation Fund ($7,662)
Contribution (from) General Fund / Other Revenue ($5,478) Balance to Levy $105,951
District Statistics
Total Parcels 4
Total Parcels Levied 4
Total Equivalent Benefit Units 845.85
Proposed Levy per Benefit Unit $125.26
Maximum Levy per Benefit Unit $164.67
Total Assessment Levy $105,951.17
Fund Balance Information
Beginning Operating Reserve Fund Balance $59,545.26
Operating Reserve Fund Adjustments $0.00
Anticipated Operating Reserve Fund Balance $59,545.26
Beginning Rehabilitation Reserve Fund Balance $488,243.74 Rehabilitation Reserve Fund Adjustments ($7,662.00)
Anticipated Rehabilitation Reserve Fund Balance $480,581.74 Anticipated Total Ending Fund Balance $540,127.00
City of Vallejo
Marine World / Fairgrounds Landscape Maintenance District Fund Number 7722 (#186)
Estimate of Cost
City of Vallejo
Landscape Maintenance Districts
Engineer’s Report, FY 2024-2025

Page 30 ends

Marin View LMD
This LMD is designated as Marin View Landscape Maintenance District and may be referred to as Marin View LMD.
 Marin View LMD was formed July 13, 1999.
 The LMD serves a residential neighborhood of 10 parcels located in north Vallejo and is fully developed.

Boundaries
The LMD lies within the City of Vallejo, generally located at the northern end of Pecan Court and bounded by Hickory and Pecan Streets.

Improvements
The LMD maintains landscaped areas and weed control zones found in the following areas:
 The ornamental and native landscaping within the median island at the end of Pecan Court including ground cover, shrubbery, and trees  Weed control in open space areas in the northwest corner and in the western portion of the LMD that assists in fire protection.

General Information
The property owners within the LMD approved the current assessment rate in Fiscal Year 1999-2000, but the assessment did not include an inflationary adjustment.

Although previous financial analysis of the LMD suggested that assessment revenues may not be adequate to fund the improvements, this funding issue resulted largely from onetime rehabilitation expense and district formation expense that were required due to the lack of maintenance in the area previously, which has generally been resolved over time.

A financial analysis of the LMD in fiscal year 2008-2009 indicated that the assessment revenues were sufficient to fund the maintenance of the improvements and did not require an assessment increase at that time. However, the revenues generated at the maximum assessment rate, limited possible funding for future rehabilitation or unforeseen expenses and without an annual inflationary adjustment, an assessment increase may be required in the near future.

City of Vallejo
Landscape Maintenance Districts
Engineer’s Report, FY 2024-2025

Page 31 ends

LMD Budget
The following provides the proposed budget and assessment rate for fiscal year 2024-25 that is necessary to provide an appropriate level of maintenance for the LMD. The budget includes the City’s estimate of anticipated expenditures, revenues and fund balances required for the annual maintenance and operation of the improvements. The assessment rate derived from this budget and the established method of apportionment shall be used to calculate each parcel’s assessments for fiscal year 2024-25. The assessment rate derived from this budget is less than or equal to the previously approved maximum assessment rate for the LMD.

City of Vallejo
Landscape Maintenance Districts
Engineer’s Report, FY 2024-2025

Page 32 ends

Direct Costs 2024-25 Budget
Contract Maintenance Costs $6,377
Salaries & Benefits $3,787
Services & Supplies $470
Landscape Water $0
Utilities $0
Landscape Rehabilitation / Vandalism $3,000
Capital Projects $0
Total Direct Costs $13,634
Administration Costs
Administration & Overhead $2,260
County Administration Fees $64
Professional Fees $36
Total Administration Costs $2,360
Collections / (Credits) Applied To Levy
Total Direct and Administration Costs $15,994
Contribution to / (from) Reserve Fund $0
Contribution to / (from) Rehabilitation Fund ($9,280)
Contribution (from) General Fund / Other Revenue ($353) Balance to Levy $6,361
District Statistics
Total Parcels 10
Total Parcels Levied 10
Total Equivalent Benefit Units 10.00
Proposed Levy per Benefit Unit $636.00
Maximum Levy per Benefit Unit $636.00
Total Assessment Levy $6,360.00
Fund Balance Information
Beginning Operating Reserve Fund Balance $7,996.80
Operating Reserve Fund Adjustments $0.00
Anticipated Operating Reserve Fund Balance $7,996.80
Beginning Rehabilitation Reserve Fund Balance $27,320.20 Rehabilitation Reserve Fund Adjustments ($9,280.00)
Anticipated Rehabilitation Reserve Fund Balance $18,040.20 Anticipated Total Ending Fund Balance $26,037.00
City of Vallejo
Marin View Landscape Maintenance District
Estimate of Cost
Fund Number 7715 (#187)
City of Vallejo
Landscape Maintenance Districts
Engineer’s Report, FY 2024-2025

Page 33 ends

Northeast Quadrant LMD
This LMD is designated as Northeast Quadrant Landscape Maintenance District and may be referred to as Northeast Quadrant LMD.
 Northeast Quadrant LMD was formed in 1984.
 The LMD currently serves approximately 1,867 parcels that include business, residential, and school land uses located in northeast Vallejo.  The LMD is not fully developed and is currently comprised of 1,848 parcels that include business, residential, and school land uses located in northeast Vallejo.  The LMD includes 159 parcels (140 assessable parcels) that are identified as Zone A. In addition to the overall improvements provided within the LMD, these parcels receive special benefits from additional local landscape improvements for which they are assessed.

Boundaries
The LMD is located within the area generally bounded by Highway 80, Hunter Ranch II and Hunter Ranch III subdivisions, Sulphur Springs Mountain, Blue Rock Springs Golf Course, Summit Landscaping District and Woodridge Landscape Maintenance District.

Within this LMD, parcels adjacent to Admiral Callaghan Lane and Columbus Parkway to the north, Plaza Drive to the west, parcels adjacent to Turner Parkway to the south and parcels adjacent to Ascot Parkway to the east are identified and designated as Zone A.

Improvements
Situated in the Blue Rock area of the City, the LMD is diverse with landscaped parkways, medians and large open spaces. The overall LMD maintains landscaped areas, weed control zones and trail systems that include approximately 23 acres of native and ornamental ground cover, shrubbery and trees; and 9 acres of weed control and plantings that are described below:
 The median of Admiral Callaghan Lane from Columbus Parkway to Turner Parkway
 Remove & replace irrigation & landscaping in median on Ascot between Redwood & Hawkesbury
 Hydro seed bare fire break areas for grass stands
 Remove & replace irrigation & plants on 4 corner medians at Redwood & Ascot  The median islands at the Columbus Parkway and Admiral Callaghan Lane intersection
 Fill in median shrubs along Ascot between Turner & Redwood Parkway  The median and landscaped areas on the south side of Turner Parkway City of Vallejo
Landscape Maintenance Districts
Engineer’s Report, FY 2024-2025

Page 34 ends

 Replace landscaping along Turner Parkway between Admiral Callaghan Way & Ascot
 The median on Ascot Parkway from Redwood Parkway to the other side of the bridge just before Hawksbury
 Remove & replace irrigation & plants on Lake Herman Rd between Columbus to end
 Maintain wrought iron fences located on public property or easements on Picasso, Topley, Rodin & Glenview Circle
 North side of West bound lane on Columbus Pkwy from Blue Rock Springs Park to St. John's Mine Rd. Irrigate & landscape
 The slope over the creek and the slope below Torrey Pine Court  The slope below Picasso, Topley, Archer and Rodin Courts  The slope landscaping to the north behind Glenview Circle and above Redwood Parkway
 The slope surrounding Matthew Court
 Ascot Parkway beyond the Blue Rock Springs Golf Course/Greater Vallejo Recreation District Park
 Solano Bike Trail along the west boundary of the urban open space Zone A’s improvements are extra landscape maintenance related to tree care, additional litter pickup, and related utilities; and maintenance of entry monument and kiosk signs.

General Information
In fiscal Year 1999-2000, to ensure a high level of service for the LMD, the property owners through protest ballot proceeding approved an assessment increase and annual inflationary adjustment.

In fiscal year 2004-2005, formation of benefit Zone A was approved by property owners through a ballot proceeding. This ballot proceeding approved an assessment increase and annual inflationary adjustment applicable to those properties only.

It has been determined that the current maximum assessment rates for the LMD are sufficient to fund the annual maintenance of the LMD improvements. Based on the budget for fiscal year 2024-25 the proposed assessments are less than the authorized maximum assessment rates. Future capital projects planned for Fiscal Year 2024-25 include design of landscape and irrigation improvements in the west bound lane of Columbus Parkway from Blue Rock Springs Park to Interstate 80 Freeway on-ramp. Fiscal Year 2024-25 design engineering repair of retaining wall along Ascot Parkway between Garnett Drive and Turner Parkway.

City of Vallejo
Landscape Maintenance Districts
Engineer’s Report, FY 2024-2025

Page 35 ends

LMD Budget
The following provides the proposed budgets and assessment rates for fiscal year 2024- 25 that are necessary to provide an appropriate level of maintenance for the LMD. The budgets include the City’s estimate of anticipated expenditures, revenues and fund balances required for the annual maintenance and operation of the improvements. The assessment rate derived from these budgets and the established method of apportionment shall be used to calculate each parcel’s assessments for fiscal year 2024-

25. The assessment rates derived from these budgets are less than or equal to the previously approved maximum assessment rate for both Zone A and the Non-Zone A parcels in the LMD.

City of Vallejo
Landscape Maintenance Districts
Engineer’s Report, FY 2024-2025

Page 36 ends

Direct Costs
2024-25
Zone A
2024-25
Non-Zone A
2024-25
Budget
Total
Contract Maintenance Costs $40,032 $175,656 $215,688
Salaries & Benefits $20,192 $163,374 $183,566
Services & Supplies $2,504 $20,260 $22,764
Landscape Water $34,336 $150,664 $185,000
Utilities $705 $3,095 $3,800
Public Signs (Zone A) $0 $0 $0
Landscape Rehabilitation / Vandalism $9,280 $40,720 $50,000 Capital Projects $0 $0 $0
Total Direct Costs $107,049 $553,769 $660,818
Administration Costs
Administration & Overhead $12,051 $97,500 $109,551
County Administration Fees $1,595 $7,033 $8,628
Professional Fees $913 $4,004 $4,917
Total Administration Costs $14,559 $108,537 $123,096
Collections / (Credits) Applied To Levy
Total Direct and Administration Costs $121,608 $662,306 $783,914 Contribution to / (from) Reserve Fund $0 $0 $0
Contribution to / (from) Rehabilitation Fund $45,579 $74,593 $120,172 Contribution (from) General Fund / Other Revenue ($7,664) ($33,628) ($41,292) Balance to Levy $159,523 $703,271 $862,794
District Statistics
Total Parcels 336 2165 2501
Total Parcels Levied 291 2043 2334
Total Equivalent Benefit Units 359.12 2448.37 2807.50
Proposed Levy per Benefit Unit $444.20 $287.24
Maximum Levy per Benefit Unit $583.98 $377.62
Total Assessment Levy $159,522.88 $703,270.95 $862,793.83 Fund Balance Information
Beginning Operating Reserve Fund Balance $60,804 $331,153 $391,957 Operating Reserve Fund Adjustments $0 $0 $0
Anticipated Operating Reserve Fund Balance $60,804 $331,153 $391,957 Beginning Rehabilitation Reserve Fund Balance $694,750 $3,042,475 $3,737,225 Rehabilitation Reserve Fund Adjustments $45,579 $74,593 $120,172 Anticipated Rehabilitation Reserve Fund Balance $740,329 $3,117,068 $3,857,397 Anticipated Total Ending Fund Balance $801,133 $3,448,221 $4,249,354 Estimate of Cost
City of Vallejo
Northeast Quadrant Landscape Maintenance District
Fund Number 7711 (#178)
City of Vallejo
Landscape Maintenance Districts
Engineer’s Report, FY 2024-2025

Page 37 ends

Sandpiper Point LMD
This LMD is designated as Sandpiper Point Landscape Maintenance District and may be referred to as Sandpiper Point LMD.
 Sandpiper Point LMD was formed in 1981
 The LMD serves a residential neighborhood of 385 parcels located in northwest Vallejo and is fully developed.

Boundaries
The LMD is generally located within the area bounded by Meadows Drive, Catalina Way and the Napa County line.

Improvements
The LMD maintains landscaped areas and weed control zones including approximately 4.5 acres of native and ornamental ground cover, shrubbery and trees; and 2.3 acres of weed controlled open space that are found in the following areas:
 The landscaped strips and medians found within the boundaries of Meadows Drive wetlands on the west, Mini Drive median landscapes on the east and the Catalina Circle Wetlands on the northwest
 Along Meadows Drive, Catalina Circle and Catalina Way  The median islands of Mini Drive
General Information
In fiscal year 1999-2000 the landscape improvement areas to be maintained for this LMD were expanded, resulting in a significant increase to the LMD’s overall maintenance costs.

Although these new areas of maintenance had a significant negative impact on the financial health of the LMD, initially the additional expenses were offset by use of available reserve funds. Although the LMD still has some reserve funds available to offset these costs, they are no longer sufficient to cover the full annual expenditures for the LMD.

Therefore, it was determined that the maximum assessment rate did not generate sufficient revenues to adequately provide for the improvements. The City conducted proceedings in FY2008-2009 to ballot the property owners within the LMD for an increased assessment and an annual inflationary adjustment commencing in fiscal year 2008-2009 which was not approved.

City of Vallejo
Landscape Maintenance Districts
Engineer’s Report, FY 2024-2025

Page 38 ends

LMD Budget
The following provides the budget and maximum assessment rate for fiscal year 2024-25.

City of Vallejo
Landscape Maintenance Districts
Engineer’s Report, FY 2024-2025

Page 39 ends

Direct Costs 2024-25 Budget
Contract Maintenance Costs $18,853
Salaries & Benefits $14,317
Services & Supplies $1,775
Landscape Water $11,295
Utilities $300
Landscape Rehabilitation / Vandalism $5,000
Capital Projects $0
Total Direct Costs $51,540
Administration Costs
Administration & Overhead $8,544
County Administration Fees $540
Professional Fees $307
Total Administration Costs $9,391
Collections / (Credits) Applied To Levy
Total Direct and Administration Costs $60,931
Contribution to / (from) Reserve Fund $0
Contribution to / (from) Rehabilitation Fund ($5,397)
Contribution (from) General Fund / Other Revenue ($1,523) Balance to Levy $54,011
District Statistics
Total Parcels 381
Total Parcels Levied 381
Total Equivalent Benefit Units 381.00
Proposed Levy per Benefit Unit $141.76
Maximum Levy per Benefit Unit $141.76
Total Assessment Levy $54,010.56
Fund Balance Information
Beginning Operating Reserve Fund Balance $30,465.55
Operating Reserve Fund Adjustments $0.00
Anticipated Operating Reserve Fund Balance $30,465.55
Beginning Rehabilitation Reserve Fund Balance $121,835.45 Rehabilitation Reserve Fund Adjustments ($5,397.00)
Anticipated Rehabilitation Reserve Fund Balance $116,438.45 Anticipated Total Ending Fund Balance $146,904.00
Estimate of Cost
City of Vallejo
Sandpiper Point Landscape Maintenance District
Fund Number 7713 (#163)
City of Vallejo
Landscape Maintenance Districts
Engineer’s Report, FY 2024-2025

Page 40 ends

South Vallejo Business Park LMD
This LMD is designated as South Vallejo Business Park Landscape Maintenance District and may be referred to as South Vallejo Business Park LMD.  South Vallejo Business Park LMD was formed in 1981
 The LMD is a light industry park that serves nine light industry parcels located in southwest Vallejo with eight of the nine parcels being fully developed Boundaries
The LMD is generally located within the area bounded by Solano Avenue, Fifth Street Avenue, Sonoma Boulevard, and the railroad tracks in the area.

Improvements
The LMD maintains parkway landscape areas adjacent to the properties within the LMD totaling approximately 2 acres of grass area with trees; and 0.5 acre of ornamental ground cover and shrubbery with trees.

General Information
In recent years, property owners within the LMD contacted the City regarding ways to reduce maintenance costs including reductions in irrigation. The City agreed to assist with this reduction by providing for water conservation practices in the maintenance contract.

However, it has been determined that further reductions could only be achieved by:
 Eliminating the grassy mounding areas and/or removing trees from the turf planting areas and restricted them to stand-alone landscape plots; or  Removing the landscaped areas from Corporate Place to Sonoma Boulevard at the time the empty lot along Sonoma Boulevard is developed.

A financial analysis of did not generate the LMD and the improvements indicated that the maximum assessment rate sufficient revenues to adequately provide for the improvements. The City conducted proceedings in FY 2008-2009 to ballot the property owners within the LMD for an increased assessment and an annual inflationary adjustment commencing in fiscal year 2008-2009 which was approved.

City of Vallejo
Landscape Maintenance Districts
Engineer’s Report, FY 2024-2025

Page 41 ends

LMD Budget
The following provides the proposed budget and increased maximum assessment rate for fiscal year 2024-25 that is necessary to provide an appropriate level of maintenance for the LMD. The budget includes the City’s estimate of anticipated expenditures, revenues and fund balances required for the annual maintenance and operation of the improvements. The assessment rate derived from this budget and the established method of apportionment shall be used to calculate each parcel’s assessments for fiscal year 2024-25.

City of Vallejo
Landscape Maintenance Districts
Engineer’s Report, FY 2024-2025

Page 42 ends

Maintenance Costs 2024-25 Budget
Contract Maintenance Costs $12,859
Salaries & Benefits $22,716
Services & Supplies $2,817
Landscape Water $35,179
Utilities $1,204
Landscape Rehabilitation / Vandalism $7,000
Capital Projects $0
Total Direct Costs $81,775
Administration Costs
Administration & Overhead $13,557
County Administration Fees $1,230
Professional Fees $701
Total Administration Costs $15,488
Collections / (Credits) Applied To Levy
Total Direct and Administration Costs $97,263
Contribution to / (from) Reserve Fund $0
Contribution to / (from) Rehabilitation Fund $32,671
Contribution (from) General Fund / Other Revenue ($6,903) Balance to Levy $123,031
District Statistics
Total Parcels 9
Total Parcels Levied 9
Total Equivalent Benefit Units 37.43
Proposed Levy per Benefit Unit $3,286.60
Maximum Levy per Benefit Unit $4,450.55
Total Assessment Levy $123,030.58
Fund Balance Information
Beginning Operating Reserve Fund Balance $48,631.65
Operating Reserve Fund Adjustments $0.00
Anticipated Operating Reserve Fund Balance $48,631.65
Beginning Rehabilitation Reserve Fund Balance $641,687.35 Rehabilitation Reserve Fund Adjustments $32,671.00
Anticipated Rehabilitation Reserve Fund Balance $674,358.35 Anticipated Total Ending Fund Balance $722,990.00
Estimate of Cost
City of Vallejo
South Vallejo Business Park Landscape Maintenance District Fund Number 7710 (#162)
City of Vallejo
Landscape Maintenance Districts
Engineer’s Report, FY 2024-2025

Page 43 ends

Town and Country II through V LMD
This LMD is designated as Town & Country II-V Landscape Maintenance District and may be referred to as Town & Country II-V LMD.
 Town & Country II-V LMD was formed in 1986
 The LMD serves a residential neighborhood of 336 parcels located in northeast Vallejo and isfully developed with no expected change in Equivalent Benefit Units (EBU)
Boundaries
The LMD is generally located within the area bounded by State Highway 37, Whitney Avenue, Serpentine Drive and Opal Drive.

Improvements
The LMD maintains landscaped areas and weed control zones that include approximately 3 acres of native and ornamental ground cover, shrubbery and trees on the various slopes within the LMD including:
 The slopes between the residences of Whitney Avenue and Basalt Drive  The slope behind residences of College Avenue and Olympic Drive including the access area from Quartz Drive
General Information
A financial analysis of the LMD and the improvements indicates that the current maximum assessment rate does not generate sufficient revenues to adequately provide for the improvements. The City conducted a proceeding in FY2008-2009 to ballot the property owners within the LMD for an increased assessment and an annual inflationary adjustment commencing in fiscal year 2008-2009 which was not approved.

LMD Budget
The following provides the budget and maximum assessment rate for fiscal year 2024-25.

City of Vallejo
Landscape Maintenance Districts
Engineer’s Report, FY 2024-2025

Page 44 ends

Direct Costs 2024-25 Budget
Contract Maintenance Costs $7,639
Salaries & Benefits $5,509
Services & Supplies $683
Landscape Water $0
Utilities $0
Landscape Rehabilitation / Vandalism $6,000
Capital Projects $0
Total Direct Costs $19,831
Administration Costs
Administration & Overhead $3,288
County Administration Fees $233
Professional Fees $133
Total Administration Costs $3,654
Collections / (Credits) Applied To Levy
Total Direct and Administration Costs $23,485
Contribution to / (from) Reserve Fund $0
Contribution to / (from) Rehabilitation Fund $1,380
Contribution (from) General Fund / Other Revenue ($1,537) Balance to Levy $23,328
District Statistics
Total Parcels 336
Total Parcels Levied 331
Total Equivalent Benefit Units 331.00
Proposed Levy per Benefit Unit $70.48
Maximum Levy per Benefit Unit $70.48
Total Assessment Levy $23,328.88
Fund Balance Information
Beginning Operating Reserve Fund Balance $11,742.64
Operating Reserve Fund Adjustments $0.00
Anticipated Operating Reserve Fund Balance $11,742.64
Beginning Rehabilitation Reserve Fund Balance $141,932.36 Rehabilitation Reserve Fund Adjustments $1,380.00
Anticipated Rehabilitation Reserve Fund Balance $143,312.36 Anticipated Total Ending Fund Balance $155,055.00
Estimate of Cost
City of Vallejo
Town and Country II-V Landscape Maintenance District
Fund Number 7712 (#184)
City of Vallejo
Landscape Maintenance Districts
Engineer’s Report, FY 2024-2025

Page 45 ends

Budget Definitions
The following provides a summary of the services and costs that are included in the LMD Budgets:

Direct Cost:

Contract Maintenance Costs — Includes all contracted labor, material and equipment required to properly maintain the landscaping, irrigation systems, drainage systems, trail systems, fencing, natural drainage areas, open spaces, and related facilities within the LMD.

Salaries & Benefits — Staff time devoted to managing and inspecting Districts. The Public Works LMD reimbursement is proportionally spread amongst twenty-seven (27) Districts based on each District’s budgeted direct and maintenance expense, inspections as a percentage of total costs in these categories for all Districts. Inspection costs are budgeted directly to the District as Field Inspection based on the historical and projected time spent in the inspection efforts.

Services & Supplies - Vehicles, supplies and services devoted to managing and inspecting Districts.

Landscape Water — Includes the cost of the furnishing of water required for the maintenance of the landscaping.

Utilities — Includes the cost of the furnishing of electricity required for the irrigation systems and hardwire telephone connections at upgraded irrigation controllers, monitored by City Staff.

Landscape Rehabilitation / Vandalism — Includes repairs to the improvements in the LMD that are not normally included in the yearly Landscape Maintenance costs. This may include repairs or replacement of damaged improvements or facilities that may be the result of vandalism, storms, frost, natural occurrences, etc., including graffiti abatement.

Landscape Rehabilitation includes annual funding for planned landscape projects, which will significantly benefit and upgrade a specific LMD and are considered above normal routine landscape maintenance work.

Capital Projects – This item includes major repairs or capital improvement projects.

City of Vallejo
Landscape Maintenance Districts
Engineer’s Report, FY 2024-2025

Page 46 ends

Administration Expenses:

Administration & Overhead — The cost allocation of all particular departments and staff of the City, for providing general support, services and operations related to the various districts, enterprises and accounts of the City.

County Administration Fee — This is the estimated cost to the LMD for the County to collect LMD assessments on the property tax bills. This charge is based on a flat rate per fund number plus a charge per assessment levied.

Professional Fees — This is the estimated cost to the District for the Assessment Engineer to prepare this report and to calculate and submit the assessments to the Solano County Auditor’s office.

Collections/ (Credits) Applied:

Fund Balance Collection — The 1972 Act provides for a LMD to fund an Operating Reserve Fund as well as the collection of funds in installments for specific projects. This budget item identifies funds collected or transferred from these two LMD Fund Balances:

Operating Reserve Fund provides for the collection of funds to operate the LMD from the time period of July 1 (beginning of the Fiscal Year) through December 10 or when the County provides the City with the first installment of assessments collected from the property tax bills (typically January or February).

Rehabilitation Funds may be collected to cover the cost of repairs that are outlined in either a defined project plan or periodic maintenance costs that may be unforeseen and are not normally included in the yearly maintenance contract costs, including the costs associated with upgrades, repairs, replacements or refurbishing of the improvements.

These amounts may be budgeted and spent each fiscal year, or collected in installments and held in the Rehabilitation Reserve Fund for a large improvement projects.

Other Revenues/General Fund (Contributions) — This item includes additional funds designated for the LMD that are not annual assessments. These funds are added to the LMD account to reduce assessments (contributions are shown as a negative amount), and may be from non-LMD or LMD sources including City General Fund Contributions for general benefit costs and/or interest earnings. This item may also include the repayment of funds previously loaned to the LMD from other sources (a positive amount) to be collected as part of the annual assessments.

City of Vallejo
Landscape Maintenance Districts
Engineer’s Report, FY 2024-2025

Page 47 ends

Balance to Levy:

The Balance to Levy — The total amount to be collected for the current fiscal year through assessments (for special benefits). The Balance to Levy represents the sum of Total Direct Cost Budget, Administration Budget; and Collections (Credits) Applied. Only those costs related to the improvements identified as special benefits are levied and collected on the tax roll. This amount divided by the “Total Equivalent Benefit Units” for the LMD determines the proposed assessment rate for the fiscal year.

City of Vallejo
Landscape Maintenance Districts
Engineer’s Report, FY 2024-2025

Page 48 ends

Method of Apportionment
Method of Apportionment
This section of the Engineer's Report explains the special and general benefits to be derived from the installation, maintenance and servicing of Improvements located throughout the LMDs, and the methodology used to apportion the total assessment to properties within the LMDs.

The LMDs consists of Assessor Parcels within the boundaries of the City of Vallejo as defined by the County of Solano tax code areas. The parcels include all privately or publicly owned parcels within said boundaries. The method used for apportioning the assessments is based upon the proportional special benefits to be derived by the properties in the LMDs over and above general benefits conferred on real property or to the public at large. The apportionment of special benefit is a two-step process: the first step is to identify the types of special benefit arising from the improvements, and the second step is to allocate the assessments to property based on the estimated relative special benefit for each type of property.

Discussion of Benefit
In summary, the assessments can only be levied based on the special benefit to property.

This benefit is received by property over and above any general benefits. With reference to the requirements for assessments, Section 22573 of the Landscaping and Lighting Act of 1972 states:
"The net amount to be assessed upon lands within an assessment district may be apportioned by any formula or method which fairly distributes the net amount among all assessable lots or parcels in proportion to the estimated benefits to be received by each such lot or parcel from the improvements."
Proposition 218, which added Article XIIID of the California Constitution, provides as follows:
"No assessment shall be imposed on any parcel which exceeds the reasonable cost of the proportional special benefit conferred on that parcel."
City of Vallejo
Landscape Maintenance Districts
Engineer’s Report, FY 2024-2025

Page 49 ends

Benefit categories have been established that represent the types of special benefit to residential, commercial, industrial and other lots and parcels resulting from the installation, maintenance and servicing lighting and landscaping improvements to be provided with the assessment proceeds. These categories of special benefit are summarized as follows:

A. Proximity to Improved Landscaped Areas and Other Public Improvements within the Landscape Maintenance Districts.

B. Access to Improved landscaped areas and Other Public Improvements within the Landscape Maintenance Districts.

C. Improved Views within the Landscape Maintenance Districts.

D. Extension of a property’s outdoor areas and green spaces for properties within close proximity to the Improvements.

E. Creation of individual lots for residential and commercial use that, in absence of the assessments, would not have been created.

Case law interpreting Proposition 218 provides enhanced clarity to the definitions of special benefits to properties in three distinct areas:
 Proximity
 Expanded or improved access
 Views
This case law also clarifies that a special benefit is a service or improvement that provides a direct advantage to a parcel and that indirect or derivative advantages resulting from the overall public benefits from a service or improvement are general benefits. The case law also provides specific guidance that park improvements are a direct advantage and special benefit to property that is proximate to a park that is improved by an assessment:

The characterization of a benefit may depend on whether the parcel receives a direct advantage from the improvement (e.g. proximity to a park) or receives an indirect, derivative advantage resulting from the overall public benefits of the improvement (e.g. general enhancement of the district’s property values).

Proximity, improved access and views, in addition to the other special benefits listed above further strengthen the basis of these assessments.

Special Benefits from the Original Engineer’s Report
The improvements provided within the various LMDs may include, but is not limited to landscaped medians, parkways, entryways, slopes, parks, open-space City of Vallejo
Landscape Maintenance Districts
Engineer’s Report, FY 2024-2025

Page 50 ends

areas and appurtenant facilities. The annual assessments outlined in this Report are based on the estimated costs to provide all necessary service, operation, administration, and maintenance required each year to keep these improvements in a healthy, vigorous, and satisfactory condition and benefit the properties. The special benefits associated with the landscape improvements and facilities are specifically:
• Enhanced desirability of properties through association with the improvements. • Improved aesthetic appeal of properties within the LMDs providing a positive representation of the area.
• Environmental enhancement through improved erosion resistance, and dust and debris control.
• Increased sense of pride in ownership of property within the LMD resulting from well-maintained improvements associated with the properties. • Reduced criminal activity and property-related crimes (especially vandalism) against properties in the LMD through well-maintained surroundings and amenities including abatement of graffiti and vandalism. • Enhanced environmental quality of the parcels within the LMDs by moderating temperatures, providing oxygenation and attenuating noise. • An enhanced sense of pride within the neighborhoods and communities and increased business opportunities as a result of enhanced surroundings and community pride.
• Enhanced adaptation of the urban environment within the natural environment and improved aesthetic value of the neighborhood and properties within the LMDs by establishing green space and recreational areas for increased social opportunities and activities that help to strengthen family value and reduce ethnic and social tensions.
• Enhanced quality of life through well-maintained green space and landscaped areas.

In addition to many of the special benefits associated with landscape amenities, local parkland and recreational facilities provide the further benefits of:
• Increased neighborhood involvement and interaction.
• Health, social and self-improvement benefits derived from utilizing the facilities. • Promotes a positive atmosphere and recreational opportunities for the youth in the neighborhood that encourages physical activity, group participation and character building.
• Increased social opportunities and active involvement for senior citizens. • Family and group activities that help to strengthen family value and reduce ethnic and social tensions.

City of Vallejo
Landscape Maintenance Districts
Engineer’s Report, FY 2024-2025

Page 51 ends

• The esthetic value of green space and recreational areas within the urban environment.

The preceding special benefits contribute to the overall aesthetic value, security and desirability of each of the assessed parcels and thereby provide a special enhancement to those properties. Furthermore, it has been determined that the lack of funding to properly service and maintain the improvements would likely have a direct negative impact on those properties.

General versus Special Benefit
In absence of the assessments, the Improvements in the LMDs would not be provided, so the Improvements are “over and above” what otherwise would be provided. Many of the parcels would not even exist if the assessments were not established because an assessment for the specific Improvements within the LMDs was a condition of development approval.

All of the Assessment proceeds derived from the LMDs will be utilized to fund the cost of providing a level of tangible “special benefits” in the form of landscaped parkways, landscaped medians, landscaped corridors, trail systems, park facilities, other Improvements and costs incidental to providing the Improvements and collecting the Assessments.

Although these Improvements may be available to the general public at large, the permanent public Improvements in the LMDs were specifically designed, located and created to provide additional and improved public resources for the direct advantage of property inside the LMDs, and not the public at large. Other properties that are either outside the LMDs or within the LMDs and not assessed, do not enjoy the unique proximity, access, views and other special benefit factors described previously.

Moreover, the homes in the LMDs would not have been built if the Assessments were not established because an assessment for the Improvements was a condition of development approval.

City of Vallejo
Landscape Maintenance Districts
Engineer’s Report, FY 2024-2025

Page 52 ends

Benefit Finding
In summary, real property located within the boundaries of the LMDs distinctly and directly benefits from closer proximity, access and views of Improvements funded by the Assessments, the creation of developable parcels and the extension of usable land area provided by the assessments. The Improvements are specifically designed to serve properties in the LMDs, not other properties or the public at large. The LMDs have been narrowly drawn to include those parcels that receive a direct advantage from the Improvements. The public at large and other properties outside the LMDs receive only limited benefits from the Improvements because they do not have proximity, good access or views of the Improvements. These are special benefits to property in the LMDsin much the same way that sewer and water facilities, sidewalks and paved streets enhance the utility and desirability of property and make them more functional to use, safer and easier to access.

Without the Assessments, the public improvements within the LMDs would not be maintained and would turn into brown, unmaintained and unusable public improvements and public lands. If this happened, it would create a significant and material negative impact on the desirability, utility and value of property in the LMDs. Most importantly, without the Assessments, the developed properties would not exist, because the subdivisions and development proposals would not have been approved. The Improvements are, therefore, clearly above what otherwise would be provided and the Improvements uniquely and specially benefit parcels in the LMDs in a way that is not enjoyed by the general public or other property. We therefore conclude that all the Improvements funded by the Assessment are of special benefit to the identified benefiting properties located within the LMDs and that the value of the special benefits from such Improvements to property in the LMDs reasonably exceeds the cost of the Assessments for every assessed parcel in the LMDs. (In other words, as required by Proposition 218; the reasonable cost of the proportional special benefit conferred on each parcel reasonably exceeds the cost of the assessments.) Any general benefits to surrounding properties outside of the LMDs, if there were any, are collateral and conferred concomitantly.

General benefit is identified as that benefit received by properties outside of the LMD.

General benefit cannot be assessed to property within the LMD boundary.

Prior to the Bordoni Ranch development, there was a 6.74 acre park located on the south side of Regents Park Drive just east of Columbus Parkway. This park had very few amenities and consisted primarily of grass, trees and sidewalks and was maintained by the GVRD. In anticipation of the increased demand to be placed on the park by the new developments, the previous park was demolished and is going to be completely reconstructed and enhanced.

City of Vallejo
Landscape Maintenance Districts
Engineer’s Report, FY 2024-2025

Page 53 ends

Once the enhanced park is completed, the City and the GVRD will continue to provide applicable maintenance services as agreed upon, which will contribute approximately 50% of the cost for the maintenance of the park, in proportion to the estimated general benefit that the park provides to the neighboring communities at large. It is reasonable to assume that the park maintenance costs above the contribution made by the City and the GVRD approximately represent the special benefit to the properties within the LMD. This assignment of special benefit to the properties within the LMD is reasonable given that the reconstruction and enhancement of the park was desired and needed due to the anticipated development of properties within the LMD.

When the Northeast Quadrant LMD was established, it was determined that a portion of the Columbus Parkway improvements within the LMD is considered general benefit. The City will contribute each year towards the landscape maintenance costs, water costs and associated administrative expenses for this particular improvement area. In compliance with the California Constitution Article XIIID the annual budget includes a contribution identified as “Other Revenues/General Fund (Contribution)”, which represents the costs identified as general benefit.

The original determination of benefits to property and the method of special benefit apportionment to property were developed by Willdan Financial Services when the LMDs were originally approved by property owners as noted in the Description of LMDs section of this Report. The description of benefits and the determination and apportionment of benefits to property in this Report are consistent with the original benefit determination and apportionment. The original method of apportionment of assessment and other relevant elements of the original Engineer’s Reports for the LMDs are hereby incorporated by reference.

Quantification of General Benefit
Although the analysis used to support these assessments concludes that the benefits are solely special, as described above, consideration is made for the suggestion that a portion of the benefits are general. General benefits cannot be funded by these assessments - the funding must come from other sources.

The maintenance and servicing of these improvements is also partially funded, directly and indirectly from other sources including the City of Vallejo, Solano County and the State of California. This funding comes in the form of grants, development fees, special programs, and general funds, as well as direct maintenance and servicing of facilities (e.g. curbs, gutters and streets, etc.) This funding from other sources more than compensates for general benefits, if any, received by the properties within the assessments district.

City of Vallejo
Landscape Maintenance Districts
Engineer’s Report, FY 2024-2025

Page 54 ends

The General Benefits from these Assessments may be quantified as illustrated in the following table.

Benefit Factor
Relative
Weight
General Benefit
Contribution
Relative General
Benefit
Creation of parcels 90 0% 0
Extension of recreation area 2.5 10% 0.25
Proximity to improved parks and landscaped areas 2.5 10% 0.25 Access to improved parks, open space and landscaped areas 2.5 10% 0.25 Improved views 2.5 10% 0.25
100 1
Total Calculated General Benefit = 1.0%
As a result, City of Vallejo will contribute at least 1% of the total budget from sources other than the assessment. This contribution offsets any general benefits from the assessment services.

This general benefit contribution is the sum of the following components:

The City of Vallejo owns, maintains, rehabilitates and replaces curb and gutter along the border of the Districts improvements. This curb and gutter serves to support, contain, retain, manage irrigation flow and growth, and provide a boundary for the improvements.

The contribution from the City of Vallejo towards general benefit from the maintenance, rehabilitation and replacement of the curb and gutter is conservatively estimated to be 1%.

The City of Vallejo owns and maintains local public streets along the border of the Districts improvements. These public streets provide access to the improvements for its enjoyment as well as efficient maintenance. The contribution from the City of Vallejo towards general benefit from the maintenance of local public streets is conservatively estimated to be 1%.

The value of the construction of the improvements can be quantified and monetized as an annuity. Since this construction was performed and paid for by non-assessment funds, this “annuity” can be used to offset general benefit costs, and is conservatively estimated to contribute 25%, with the exception of Glen Cove III 2015 LMD which was calculated to contribute 5%.

Therefore, the total General Benefit is conservatively quantified at 1% which is more than offset by the total non-assessment contribution towards general benefit of 27%, with the exception of Glen Cove III 2015 LMD which is offset by the total non-assessment contribution towards general benefit of 7%.

City of Vallejo
Landscape Maintenance Districts
Engineer’s Report, FY 2024-2025

Page 55 ends

Method of Assessment
The method of apportionment for the LMDs calculates the receipt of special benefit from the respective improvements based on the actual or proposed land use of the parcels within the LMDs. The net amount to be assessed upon parcels within the LMDs is apportioned by a formula and method that fairly distributes the net amount to be assessed among all assessable parcels in proportion to the special benefits to be received by each parcel from the improvements. Additionally, in compliance with Article XIIID Section 4 of the State Constitution each parcel’s assessment does not exceed the reasonable cost of the proportional special benefit conferred to that parcel. The benefit formula used to determine the assessment obligation is therefore based upon both the improvements that benefit the parcels within the LMDs as well as the proposed land use of each property as compared to other parcels that benefit from those specific improvements.

Equivalent Benefit Units
The special benefits received by each parcel within the LMDs and each parcel’s proportional annual assessment is calculated on the basis of a formula known as Equivalent Benefit Units. The Equivalent Benefit Unit (EBU) method of apportionment establishes a proportional benefit relationship between the various parcels within the LMDs and the improvements provided by the LMDs. The EBU assigned to each parcel utilizes a set formula and proportional weighting factors based on the land use, size and development status of each parcel within the LMDs compared to other parcels within the LMDs.

Equivalent Benefit Unit Application by Land Use
Land Use Designation EBU Application
Single Family Residence One (1.0) Benefit Unit per Unit Vacant Residential Zoned Four-Tenths (0.4) Benefit Unit per Acre Multi Family Residence Seven-Tenths (0.7) Benefit Unit per Unit City of Vallejo
Landscape Maintenance Districts
Engineer’s Report, FY 2024-2025

Page 56 ends

Equivalent Benefit Unit Application by Land Use (Continued) Land Use Designation EBU Application
Planned-Residential Development One (1.0) Benefit Unit per Planned Single-Family (Has received tentative or final Unit, Seven-Tenths (0.7) Benefit Unit per Multimap approval) Family Unit Commercial Use Three (3.0) Benefit Units per Acre
Vacant Commercial Zoned Four-Tenths (0.4) Benefit Unit per Acre Industrial Use Three (3.0) Benefit Units per Acre
Vacant Industrial Zoned Four-Tenths (0.4) Benefit Unit per Acre Exempt Properties Zero (0.0) Benefit Units per Parcel
While all the land use designations shown above are not necessarily applicable in each LMD, each LMD is comprised of one or more of these land uses, and the proportional relationship between those various land uses is still applicable. The benefit formula applied to parcels within each LMD is based on the preceding EBU application. Each parcel's EBU correlates the parcel’s special benefit received as compared to the other parcels benefiting from the improvements within that LMD.

Exceptions
Bordoni Ranch LMD was formed with the following special conditions:

Planned-Residential Development — This land use is defined as any property for which a tentative map has been filed but for which a final tract map has not yet been approved. Properties designated as Planned-Residential Development shall be assessed at 2.0 EBU per acre, but a minimum of 1.00 EBU (parcels less than one acre are assigned 1.0 EBU).

Vacant Residential Zoned — This land use is defined as property that is zoned or planned for residential development, but a development map (tentative or final map) for the property has not yet been approved. Properties designated as Vacant Land shall be assessed at 1.0 EBU per acre, but a minimum of 1.00 EBU (parcels less than one acre are assigned 1.0 EBU).

The following formula is used to calculate each parcel’s proportional benefit:

Property Type EBU x (Acreage/Units/Parcel) = Parcel’s calculated EBU An assessment amount per EBU (“Rate”) for the LMD improvements is established by taking the total cost of the improvements and dividing that amount by the total number of EBUs for parcels benefiting from such improvements.

Total Balance to Levy / Total EBUs = Levy per EBU (“Rate”) This amount is then applied back to each parcel’s individual EBU to determine each parcel’s proportionate benefit and assessment obligation.

City of Vallejo
Landscape Maintenance Districts
Engineer’s Report, FY 2024-2025

Page 57 ends

Rate x Parcel’s EBU = Parcel’s Levy Amount
Glen Cove III 2015 LMD was formed with the following equivalent benefit units for different property types:

Land Use Designation EBU Application
Single Family Residential 1.0 Benefit Units per Unit
Condominium 0.39 Benefit Units per Unit
Duplex, Triplex, Fourplex 0.45 Benefit Units per Unit
Multi-Family Residential (5+ Units 0.27 Benefit Units per Unit Mobile Home on Separate Lot 0.22 Benefit Units per Unit Commercial and Industrial 0.50 Benefit Units per fifth acre for the first 5 acres 0.50 Benefit Units per each additional
acre over 5 acres
Office 1.42 Benefit Units per fifth acre for the first 5 acres 1.42 Benefit Units per each additional
acre over 5 acres
Self-Storage of Parking Lot 0.05 Benefit Units per fifth acre for the first 5 acres 0.05 Benefit Units per each additional
acre over 5 acres
Golf Course 0.063 Benefit Units per fifth acre for the first 5 acres 0.063 Benefit Units per each additional
acre over 5 acres
Vacant / Undeveloped 0.25 Benefit Units per parcel
City of Vallejo
Landscape Maintenance Districts
Engineer’s Report, FY 2024-2025

Page 58 ends

Appeals and Interpretation
Any property owner who feels that the assessment levied on the subject property is in error as a result of incorrect information being used to apply the foregoing method of assessment, may file a written appeal with the Director of Public Works or her or his designee. Any such appeal is limited to correction of an assessment during the then current or, if before July 1, the upcoming fiscal year. Upon the filing of any such appeal, the Director of Public Works or his or her designee will promptly review the appeal and any information provided by the property owner. If the Director of Public Works or her or his designee finds that the assessment should be modified, the appropriate changes shall be made to the assessment roll. If any such changes are approved after the assessment roll has been filed with the County for collection, the Director of Public Works or his or her designee is authorized to refund to the property owner the amount of any approved reduction. Any property owner who disagrees with the decision of the Director of Public Works or her or his designee, may refer their appeal to the City Council of the City of Vallejo and the decision of the City Council of the City of Vallejo shall be final.

Inflationary Adjustment
Bordoni Ranch LMD
As noted previously, the property owners within the Bordoni Ranch LMD approved an inflationary adjustment in fiscal year 2010-2011 through a ballot proceeding when the LMD was formed. The following paragraph describes the approved inflationary adjustment:

The Maximum Assessment Rate is equal to the (Initial) Zone Maximum Assessment Rate established for fiscal year 2010-2011 adjusted annually by the greater of, three percent (3%) or the annual percentage change in the Consumer Price Index (CPI) of “All Urban Consumers” for the San Francisco-Oakland-San Jose Area.

The change in the CPI from February 2023 to February 2024 was 2.37%. Therefore, the maximum authorized assessment rate for the Bordini Ranch LMD fiscal year 2024-2025 is increased by 3.00% which equates to $753.49 per equivalent benefit unit for Zone 1 and $517.82 per equivalent benefit unit for Zone 2. The estimate of cost and budget in the Engineer’s Report proposes assessments for fiscal year 2024-25 at the rate of $392.99 per equivalent benefit unit for Zone 1 and $270.33 per equivalent benefit unit for Zone 2, which is the less than the maximum authorized assessment rate.

City of Vallejo
Landscape Maintenance Districts
Engineer’s Report, FY 2024-2025

Page 59 ends

Glen Cove III 2015 LMD (LMD 2)
As noted previously, the property owners within the Glen Cove III area approved an inflationary adjustment in fiscal year 2015-2016 through a ballot proceeding when the Glen Cove III LMD 2 was established. The authorized maximum assessment rate is subject to an annual adjustment tied to the Consumer Price Index-U for the San Francisco Bay Area as of December of each succeeding year (the “CPI”). As the amount of the annual increase in the CPI from December 2022 to December 2023 is 2.62%, the maximum authorized assessment rates for fiscal year 2024-25 are 2.62% above the maximum authorized assessment rate for fiscal year 2023-24. Including the authorized annual adjustment, the maximum authorized assessment rates for fiscal year 2024-25 are $134.69 for properties in Zone A, $132.02 for properties in Zone B, and $126.60 for properties in Zone C.

Highlands – Garthe Ranch LMD (Zone B)
As noted previously, the property owners within the Highlands of Garthe Ranch LMD (Zone B) approved an inflationary adjustment in fiscal year 2007-2008 through a ballot proceeding when the LMD / Zone B was established. The following paragraph describes the approved inflationary adjustment:

The Maximum Assessment Rate is equal to the Maximum Assessment Rate established for the previous fiscal year adjusted annually by the greater of, three percent (3%) or the annual percentage change in the Consumer Price Index for All Urban Consumers (CPI-U), as distributed by the Bureau of Labor Statistics for the San Francisco-Oakland-San Jose Area.

The change in the CPI from February 2023 to February 2024 was 2.37%. Therefore, the maximum authorized assessment rate for the Garthe Ranch LMD Zone B fiscal year 2024- 2025 is increased by 3.00% which equates to $2,786.47 per equivalent benefit unit. The estimate of cost and budget in the Engineer’s Report proposes assessments for fiscal year 2024-2025 at the rate of $2,705.42, which is less than the maximum authorized assessment rate.

Northeast Quadrant LMD
As noted previously, the property owners within the Northeast Quadrant LMD approved an inflationary adjustment in fiscal year 1999-2000 through a ballot proceeding. The following paragraph describes the approved inflationary adjustment:

The maximum assessment for each fiscal year is increased by the percentage increase from April 1 of the prior year to April 1 of the current year by the Consumer Price Index for All Urban Consumers (CPI-U), as distributed by the Bureau of Labor Statistics (BLS) for the Consolidated Metropolitan Statistical Area (CMSA) covering San Francisco-Oakland-San Jose. If the April CPI-U is not available at the time the report is prepared, a similar time period may be used.

City of Vallejo
Landscape Maintenance Districts
Engineer’s Report, FY 2024-2025

Page 60 ends

However, the maximum assessment rate in any fiscal year (for the Non-Zone A properties) shall not exceed $400 as adjusted by the CPI-U, unless approved by a majority vote of the property owners in the Northeast Quadrant LMD. The Zone A’s assessment rate shall not be capped at a particular level in any fiscal year.

The change in the CPI from February 2023 to February 2024 was 2.37%. Therefore, the maximum authorized assessment rate for the Northeast Quadrant LMD fiscal year 2024- 2025 is increased by 2.37% which equates to $583.98 per equivalent benefit unit for Zone A and $377.62 per equivalent benefit unit for Non-Zone A. The estimate of cost and budget in the Engineer’s Report proposes assessments for fiscal year 2024-2025 at the rate of $444.20 per equivalent benefit unit for Zone A and $287.24 per equivalent benefit unit for Non-Zone A, which is less than the maximum authorized assessment rate.

Marine World / Fairgrounds LMD
The Maximum Assessment Rate is equal to the Maximum Assessment Rate established for the previous fiscal year adjusted annually by the annual percentage change in the Consumer Price Index for All Urban Consumers (CPI-U), as distributed by the Bureau of Labor Statistics for the San Francisco-Oakland-San Jose Area.

The change in the CPI from February 2023 to February 2024 was 2.37%. Therefore, the maximum authorized assessment rate for the Marine World / Fairgrounds LMD fiscal year 2024-2025 is increased by 2.37% which equates to $164.67 per equivalent benefit unit.

The estimate of cost and budget in the Engineer’s Report proposes assessments for fiscal year 2024-2025 at the rate of $125.26, which is less than the maximum authorized assessment rate.

South Vallejo Business Park LMD
The Maximum Assessment Rate is equal to the Maximum Assessment Rate established for the previous fiscal year adjusted annually by the annual percentage change in the Consumer Price Index for All Urban Consumers (CPI-U), as distributed by the Bureau of Labor Statistics for the San Francisco-Oakland-San Jose Area.

The change in the CPI from February 2023 to February 2024 was 2.37%. Therefore, the maximum authorized assessment rate for the South Vallejo Business Park LMD fiscal year 2024-2025 is increased by 2.37% which equates to $4,450.55 per equivalent benefit unit.

The estimate of cost and budget in the Engineer’s Report proposes assessments for fiscal year 2024-2025 at the rate of $3,286.60, which is less than the maximum authorized assessment rate.

City of Vallejo
Landscape Maintenance Districts
Engineer’s Report, FY 2024-2025

Page 61 ends

Assessment
WHEREAS, the City of Vallejo City Council directed the undersigned Engineer of Work to prepare and file a report presenting an estimate of costs, a diagram for the LMDs and an assessment of the estimated costs of the improvements upon all assessable parcels within the LMDs, to which Resolution and the description of the Improvements therein contained, reference is hereby made for further particulars; NOW, THEREFORE, the undersigned, by virtue of the power vested in me under said Act and the order of the City Council of said City of Vallejo, hereby make the following assessment to cover the portion of the estimated cost of the improvements, and the costs and expenses incidental thereto to be paid by the LMDs.

As required by the Act, an Assessment Diagram is hereto attached and made a part hereof showing the exterior boundaries of said LMDs. The distinctive number of each parcel or lot of land in the LMDs is its Assessor Parcel Number appearing on the Assessment Roll.

I do hereby assess and apportion the net amount of the cost and expenses of the improvements, including the costs and expenses incident thereto, upon the parcels and lots of land within the LMDs, in accordance with the special benefits to be received by each parcel or lot, from the improvements, and more particularly set forth in the Cost Estimate and Method of Assessment hereto attached and by reference made a part hereof.

The assessment is made upon the parcels or lots of land within the LMDs in proportion to the special benefits to be received by the parcels or lots of land, from the improvements.

Each parcel or lot of land is described in the Assessment Roll by reference to its parcel number as shown on the Assessor's Maps of the County of Solano for the fiscal year 2024-2025. For a more particular description of the property, reference is hereby made to the deeds and maps on file and of record in the office of the County Recorder of the County.

I hereby place opposite the Assessor Parcel Number for each parcel or lot within the Assessment Roll, the amount of the assessment for the fiscal year 2024-2025 for each parcel or lot of land within the LMDs.

City of Vallejo
Landscape Maintenance Districts
Engineer’s Report, FY 2024-2025

Page 62 ends

Dated: May 6, 2024
Engineer of Work
By .

John W. Bliss, License No. C052091
City of Vallejo
Landscape Maintenance Districts
Engineer’s Report, FY 2024-2025

Page 63 ends

Appendix A - 2024-2025 Assessment Roll
An Assessment Roll (a listing of all parcels assessed within the LMDs and the amount of the assessment) will be filed with the City Clerk and is, by reference, made part of this report and is available for public inspection during normal office hours.

Each lot or parcel listed on the Assessment Roll is shown and illustrated on the latest County Assessor records and these records are, by reference made part of this report.

These records shall govern for all details concerning the description of the lots or parcels.

City of Vallejo
Landscape Maintenance Districts
Engineer’s Report, FY 2024-2025

Page 64 ends

Appendix B - Assessment Diagram
Assessment Diagrams for the LMDs have been prepared and are on file with the City.

Reference is hereby made to such Diagrams, and they are incorporated herein by reference.

CONSENT CALENDAR 8.I.

DATE: May 28, 2024
TO: Mayor and Members of the City Council
FROM: Melissa Tigbao, P.E., Public Work Director
Jason Lacey, Landscape Maintenance Manager
SUBJECT: ADOPT A RESOLUTION APPROVING THE ENGINEER'S REPORT AND DECLARING THE INTENTION TO LEVY AND COLLECT ASSESSMENTS FOR FISCAL YEAR 2024-25

WITHIN THE HIDDENBROOKE MAINTENANCE DISTRICT AND SETTING A PUBLIC HEARING ON THE MATTER FOR JUNE 11, 2024, AT 7:00 P.M.

RECOMMENDATION
Adopt a Resolution approving the Engineer's Report and declaring the intention to levy and collect assessments for Fiscal Year 2024-25 within the Hiddenbrooke Maintenance District (HMD) and setting a public hearing on the matter for June 11, 2024, at 7:00 PM.

REASONS FOR RECOMMENDATION
The City Council appointed SCI Consulting Group, Inc. as the Engineer of Work and directed it to prepare the Engineer's Report for the HMD. The Engineer’s Report identifies all assessable parcels within the HMD and was prepared pursuant to the Landscape and Lighting Act of 1972 and in compliance with Article XIIID of the California Constitution (Proposition 218). A public hearing on this matter is legally required.

BACKGROUND AND DISCUSSION
The City of Vallejo has 27 Landscape Maintenance Districts, thirteen of which were established in accordance with the Landscape and Lighting Act of 1972 (1972 Act), and fourteen of which were established in accordance with the Improvement Act of 1911 (1911 Act). The City Council will be considering the 1911 Act districts and the remaining 1972 Act districts under separate Council actions.

Approval of this resolution starts the process for establishing the FY 2024-25 assessments for the Hiddenbrooke Maintenance District (HMD). The HMD is being handled under a separate Council action to allow the Hiddenbrooke Homeowners' Association time to review the public financial information regarding the district.

An Engineer’s Report (Report) is prepared annually for the HMD and analyzes the district based on “equivalent benefit units” (EBUs). One EBU is applied to a single-family residence. Proposed assessments for each parcel are based on the special benefit received by the parcels within the district. The proposed FY 2024-25 budget for the HMD is included as part of this Report.

The FY 2024-25 Report for the HMD is included as an attachment to this staff report and is also on file in the City Clerk’s Office (3rd Floor) and in the Department of Public Works (4th Floor), City Hall, 555 Santa Clara Street, Vallejo, CA 94590.

FISCAL IMPACT
The proposed HMD annual assessment for FY 2024-25 is $611.04 per EBU. This assessment rate proposed is the same assessment rate levied for FY 2023-24. The General Fund will contribute $2,860 to the HMD to cover the general benefit received by properties outside the HMD as described in the Engineer’s Report.

Date: May 28, 2024
Subject: ADOPT A RESOLUTION APPROVING THE ENGINEER'S REPORT AND DECLARING

THE INTENTION TO LEVY AND COLLECT ASSESSMENTS FOR FISCAL YEAR 2024-25 WITHIN THE HIDDENBROOKE MAINTENANCE DISTRICT AND SETTING A PUBLIC HEARING ON THE MATTER FOR JUNE 11, 2024, AT 7:00 P.M.

Page 2 ends

These general benefit costs cannot be assessed to the HMD.

ENVIRONMENTAL REVIEW
This action is exempt from the California Environmental Quality Act (CEQA) because it is not a project which has a potential for resulting in either a direct physical change in the environment, or a reasonably foreseeable indirect physical change in the environment, pursuant to CEQA Guideline section 15378.

ATTACHMENTS

1. Reso - HMD FY24-25_CAO Stamp

2. Vallejo HMD ER 4-15-24

CONTACT
Melissa Tigbao, P.E., Public Works Director, (707) 648-4433 [email protected]
RESOLUTION NO. 24-___ N.C.

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF VALLEJO

APPROVING THE ENGINEER'S REPORT AND DECLARING THE INTENTION TO LEVY AND COLLECT ASSESSMENTS FOR FISCAL YEAR 2024-2025

WITHIN THE HIDDENBROOKE MAINTENANCE DISTRICT AND SETTING A PUBLIC HEARING FOR JUNE 11, 2024 AT 7:00 P.M.

WHEREAS, the City Council, by previous Resolutions, formed and levied annual assessments for the Hiddenbrooke Maintenance District (hereafter referred to as the "District"), pursuant to the provisions of Article XIIID of the California Constitution and the Landscaping and Lighting Act of 1972 (the "1972 Act"), Part 2 of Division 15 of the California Streets and Highways Code (commencing with Section 22500 thereof); and
WHEREAS, by subsequent resolution, the City Council ordered the preparation of an Engineer's Report ("Report") for the District for Fiscal Year (FY) 2024-2025; and WHEREAS, the Engineer's Report was prepared by SCI Consulting Group, Inc. as the Engineer of Work, in accordance with 22565 et. seq. of the Streets and Highways Code and Article XIIID of the California Constitution; and
WHERAS, the Report has been filed with the City Clerk duly considered by the City Council and is hereby deemed sufficient and preliminarily approved.

NOW, THEREFORE, BE IT RESOLVED, DETERMINED, AND ORDERED by the City Council of the City of Vallejo, as follows:

Section 1. The Engineer’s Report regarding the annual levy for the District for Fiscal Year 2024- 2025 is hereby approved and directed filed in the Office of the City Clerk. Reference is hereby made to the Engineer’s Report for a full and detailed description of the improvements, substantial changes in existing improvements, the boundaries of the District, and the proposed assessments upon assessable lots and parcels of land within the District.

Section 2. It is the intention of this City Council to levy and collect assessments within the District for FY 2024-2025. It is proposed that the District undertake the following improvements including but not limited to: storm water management, street system maintenance, open space maintenance, landscape maintenance, geotechnical monitoring and maintenance, street tree maintenance, Welcome Center operation and maintenance, waterfall maintenance, monument maintenance and passive park maintenance and all appurtenant facilities and operations related thereto. The Engineer's Reports describes all the improvements and any substantial changes in existing improvements.

Section 3. The District consists of the lots and parcels shown on the boundary map of the District on file with the City, and reference is hereby made to such map for further particulars.

Section 4. That the assessment is subject to an annual adjustment tied to the Consumer Price Index-U for the San Francisco Bay Area as of February 1 of each succeeding year (the “CPI”). The maximum authorized assessment rate is equal to the maximum assessment rate approved by property owners FY 2003-04 adjusted annually by the change in the CPI.

The change in the CPI from February 2023 to February 2024 was 2.37%. Therefore, the maximum authorized assessment rate for FY 2024-2025 is increased by 2.37%, which equates to $932.31 per equivalent benefit unit. The estimate of cost and budget in the Engineer’s Report proposes assessments for fiscal year 2024-2025 at the rate of $611.04, which is less than the maximum authorized assessment.

Section 5. A duly noticed public hearing shall be held on June 11, 2024 at 7:00 p.m. in the City Council Chambers, located at 555 Santa Clara Street in Vallejo, California, to hear public comment and to consider the ordering of the improvements and the levy and collection of the proposed assessments.

Section 6. The City Clerk shall cause a notice of the hearing to be given by publishing a copy of this Resolution once, at least ten 10 days prior to the date of the hearing above specified, in a newspaper circulated in the City of Vallejo.

Adopted by the City Council of the City of Vallejo at a regular meeting held on May 28, 2024 with the following vote:

AYES:

NOES:

ABSENT:

ABSTAIN:
____________________________________
ROBERT H. MCCONNELL, MAYOR
ATTEST:
____________________________________
DAWN G. ABRAHAMSON, CITY CLERK

ENGINEER’S REPORT
City of Vallejo
Hiddenbrooke Maintenance District
Fiscal Year 2024-25
Pursuant to the City of Vallejo Municipal Code
Chapter 14.30 and Article XIIID of the California
Constitution
Page i
(This page intentionally left blank.)
Page ii
Table of Contents
Introduction ................................................................................................................. 1 Overview.................................................................................................................................... 1 Assessment Process .................................................................................................................. 3 Engineer’s Report ...................................................................................................................... 3 Plans & Specifications .................................................................................................. 4 Fiscal Year 2024-2025 Estimate of Cost and Budget .................................................... 10 Cost Estimates ......................................................................................................................... 10 Method of Apportionment ......................................................................................... 18 Method of Apportionment ...................................................................................................... 18 Discussion of Benefit ............................................................................................................... 18 General versus Special Benefit ................................................................................................ 20 Benefit Finding ........................................................................................................................ 20 Method of Assessment ............................................................................................................ 25 Assessment Range Formula .................................................................................................... 27 Duration of Assessment .......................................................................................................... 29 Appeals and Interpretation ..................................................................................................... 30 Assessment ................................................................................................................ 31 Appendix A - 2024-2025 Assessment Roll ................................................................... 33 Appendix B - Assessment Diagram ............................................................................. 34 City of Vallejo
Hiddenbrooke Maintenance District
Engineer’s Report, FY 2024-2025

Page 1 ends

Introduction
Overview
On January 28, 1992, the City of Vallejo (the “City”) City Council (the “Council”), adopted Resolution No. 92-46 N.C. approving the Engineer’s Report, confirming diagram and assessment, ordering improvements and formation of the “Sky Valley Maintenance Assessment District.” The City originally formed the Sky Valley Maintenance Assessment District to pay for certain public improvements, including but not limited to, storm water management, street system maintenance, open space maintenance, landscape maintenance, and geotechnical monitoring and maintenance.

On October 6, 1998, the Council by Resolution No. 98-373 approved the Engineer’s Report for the levy and collection of an increased assessment within the District for Fiscal year 1999-2000. Prior to the adoption of the annual assessments and Engineer’s Report, the City Council conducted mailed ballot proceedings in accordance with the requirements of the California Constitution Article XIIID. In addition to the property owner balloting for the assessments, the name of the District was changed from the “Sky Valley Maintenance Assessment District” to the “Hiddenbrooke Maintenance District” or “HMD” to reflect the name change of the former Sky Valley development. The approved Report identified the special benefits received by property within the HMD, addressed public and general benefits as required by Article XIIID and established the maximum assessment rate and the application of that rate to the various land uses within the District.

Prior to Fiscal Year 2000-2001, the property owners within the District requested the City maintain additional improvements including a “Welcome Center” and a Passive Park within the development. A second majority protest ballot proceeding for an increased maximum assessment and inflationary formula resulting from the addition of the Welcome Center and Passive Park was conducted. The tabulation of ballots returned indicated 100% approval of the new maximum assessment of $509.00 per Equivalent Dwelling Unit (Equivalent Benefit Unit) including an annual inflationary adjustment based on the annual percentage change in the Consumer Price Index (CPI). On February 15, 2000 the Council, by Resolution No. 00-72, approved a supplemental Report that added the maintenance of the additional improvements and established the maximum assessment rate and formula for the District.

In Fiscal Year 2002-2003, property owners within the Hiddenbrooke Maintenance District asked the City to reconstruct the District budget and assessment methodology to simplify the budgeting of expenditures and revenues, and to develop a more equitable methodology. The reconstruction resulted in the following changes:

City of Vallejo
Hiddenbrooke Maintenance District
Engineer’s Report, FY 2024-2025

Page 2 ends

1. The assessment methodology was changed to simplify the calculation of the annual levy and to reduce the potential for future errors. The trigger for property development status has changed from building permit issuance to development status according to the County of Solano Secured Roll as of January 1st of the fiscal year prior to the upcoming fiscal year in which the levy will take place. For example, development status according to the County secured roll as of January 1, 2003 would be used for the Fiscal Year 2003-2004 levy. Previously, the trigger date was based on the issuance of a building permit by March 1st of the fiscal year prior to the upcoming fiscal year in which the levy would have taken place.

2. An increased Maximum Assessment of $532.22 per Equivalent Dwelling Unit including an annual inflationary adjustment based on the annual percentage change in the Consumer Price Index (CPI) as calculated by the Bureau of Labor Statistics (BLS).

3. The Hiddenbrooke developer-funded reserve balance was intended to be spent for improvements. It will now be set aside as a reserve fund based on the original agreement with the City of Vallejo.

4. The Golf Course Property, including the parcel that has the Golf Course Clubhouse situated upon it, is not included within the boundaries of the District and, accordingly, is not subject to assessment by the HMD.

A third majority protest ballot proceeding for the changes described above was conducted. The tabulation of ballots returned indicated approval, and on July 22, 2003 the Council, by Resolution, approved an Engineer’s Annual Levy Report that established the maximum assessment rate, formula and boundaries for the District.

In Fiscal Year 2004-2005, the City proposed to annex the Orchards development, at the south end of the original District, in order to provide funding for the operations and maintenance of improvements in this area. A fourth majority protest ballot proceeding for the annexation and maximum assessment of $534.88 per Equivalent Dwelling Unit including an annual inflationary adjustment based on the annual percentage change in the CPI. On June 8, 2004 the Council, by Resolution, approved a supplemental Report that annexed the Orchards development and established the maximum assessment rate and formula.

City of Vallejo
Hiddenbrooke Maintenance District
Engineer’s Report, FY 2024-2025

Page 3 ends

Assessment Process
This Engineer’s Report ("Report") was prepared to establish the budgets for the continued capital improvement and services expenditures that would be funded by the proposed 2024-25 assessments, determine the benefits received from the lighting and landscaping maintenance and improvements by property within the HMD and the method of assessment apportionment to lots and parcels within the HMD. This Report and the proposed assessments have been made pursuant to the provisions of Chapter 14.30 of the Vallejo Municipal Code, the Landscaping and Lighting Act of 1972, and Article XIIID of the California Constitution (the “Article”).

In each subsequent year for which the assessments will be continued, the Council must direct the preparation of an Engineer's Report, budgets and proposed assessments for the upcoming fiscal year. After the Engineer's Report is completed, the Council may preliminarily approve the Engineer's Report and proposed assessments and establish the date for a public hearing on the continuation of the assessments. This Report was prepared pursuant to the direction of the Council.

If the Council approves this Engineer's Report and the continuation of the assessments by resolution, a notice of assessment levies must be published in a local paper at least 10 days prior to the date of the public hearing. The resolution preliminarily approving the Engineer's Report and establishing the date for a public hearing is used for this notice.

Following the minimum 10-day time period after publishing the notice, a public hearing is held for the purpose of allowing public testimony about the proposed continuation of the assessments. This hearing is currently scheduled for June 11, 2024. At this hearing, the Council will consider approval of a resolution confirming the continuation of the assessments for fiscal year 2024-2025. If so confirmed and approved, the assessments would be submitted to the County Auditor/Controller for inclusion on the property tax rolls for Fiscal Year 2024-2025.

Engineer’s Report
SCI Consulting Group has been retained by the City as the Assessment Engineer for this Assessment since 2011-2012. Language taken from the previous Engineer's Report is shown in Times New Roman, 10 pt. Font.

City of Vallejo
Hiddenbrooke Maintenance District
Engineer’s Report, FY 2024-2025

Page 4 ends

Plans & Specifications
The work and improvements (the “Improvements”) are proposed to be undertaken by the City of Vallejo Hiddenbrooke Maintenance District and the cost thereof paid from the levy of the annual assessment provide special benefit to Assessor Parcels within the District as defined in the Method of Assessment herein. The improvements that may be provided to properties within or adjacent to the District may include any or all of the improvements described under Section 14.30.100 of the Vallejo Municipal Code. These improvements include, but are not limited to, the following services:
 Storm water management
 Street system maintenance
 Open space maintenance
 Trail maintenance
 Landscape and appurtenant facilities maintenance
 Tree maintenance
 Geotechnical monitoring and maintenance
 Welcome Center operation and maintenance
 Waterfall maintenance
 Monument maintenance
 Passive park maintenance
Installation, maintenance and servicing of public facilities, and incidental expenses, including but not limited to, street lights, public lighting facilities, landscaping, sprinkler systems, statuary, fountains, other ornamental structures and facilities, landscape corridors, ground cover, shrubs and trees, street frontages, drainage systems, fencing, entry monuments, graffiti removal and repainting, and labor, materials, supplies, utilities and equipment, as applicable, for property owned and maintained by the City of Vallejo.

Any plans and specifications for these improvements will be filed with the Public Works Director of the City of Vallejo and are incorporated herein by reference.

Installation means the construction of lighting and landscaping improvements, including, but not limited to: land preparation, such as grading, leveling, cutting and filling, sod, landscaping, irrigation systems, sidewalks and drainage and lights.

City of Vallejo
Hiddenbrooke Maintenance District
Engineer’s Report, FY 2024-2025

Page 5 ends

Maintenance means the furnishing of services and materials for the ordinary and usual maintenance, operation and servicing of any improvement, including repair, removal or replacement of all or any part of any improvement; providing for the life, growth, health, and beauty of landscaping, including cultivation, irrigation, trimming, spraying, fertilizing, or treating for disease or injury; the removal of trimmings, rubbish, debris, and other solid waste, and the cleaning, sandblasting, and painting of walls and other improvements to remove or cover graffiti.

Servicing means the furnishing of electric current or energy for the operation or lighting of any improvements, and water for irrigation of any landscaping or the maintenance of any other improvements.

Incidental expenses include all of the following: (a) The costs of preparation of the report, including plans, specifications, estimates, diagram, and assessment; (b) the costs of printing, advertising, and the giving of published, posted, and mailed notices; (c) compensation payable to the County for collection of assessments; (d) compensation of any engineer or attorney employed to render services in proceedings pursuant to this part; (e) any other expenses incidental to the construction, installation, or maintenance and servicing of the Improvements; (f) any expenses incidental to the issuance of bonds or notes pursuant to Streets & Highways Code Section 22662.5; and (g) costs associated with any elections held for the approval of a new or increased assessment. (Streets & Highways Code §22526).

The assessment proceeds will be exclusively used for Improvements within the Assessment District plus Incidental expenses.

The improvements provided through the District are essentially monitoring and maintenance services. The plans and specifications for the work consist of schematic maps, letters, agreements, conditions, cost estimates and related documents which describe the nature and scope of the monitoring and maintenance activities to be performed. These documents include but are not limited to the following:

1. Map entitled Hiddenbrooke Nature Trail by Phillippi Engineering, Inc. dated March 1997 as amended

2. Agreement dated February 2, 1989 concerning mitigation measures relating to Storm Drainage and Water Supply between Sky Valley Company and the City of Benicia

3. Letter from Greater Vallejo Recreation District (GVRD) to the City of Vallejo dated February 24, 1997 regarding Sky Valley Maintenance Assessment District City of Vallejo
Hiddenbrooke Maintenance District
Engineer’s Report, FY 2024-2025

Page 6 ends

4. HMD summary of budgets with attachments prepared by the City of Vallejo dated May 19, 1997

5. HMD estimated budget for year 0 to 15 (build out) prepared by the City of Vallejo dated June 1997

6. Landscape maintenance specification for public streets in the HMD

7. Portions of the Hiddenbrooke Specific Plan, as amended, which contains maintenance specifications and criteria

8. Hiddenbrooke Parkway Welcome Center Services Agreement

9. Letter in regard to Solicitor’s Opinion that Hiddenbrooke Golf Course will fund its own landslide repair improvements
The foregoing documents are available for review in the office of the City Engineer and are incorporated herein by reference.

General Definitions
The terms hereinafter set forth have the following meanings in this Report and have been maintained, verbatim from the previous Engineer’s Report:
“Acreage” means the gross acreage of any Assessor’s Parcel of real property in the HMD calculated to two (2) decimal places, without any deduction for any intrusions or limitations of usage, including but not limited to, easements, public or private rights of way, utility installment or parking area improvements. The acreage of each Assessor’s Parcel shall be as determined by the City Engineer. The City Engineer may rely upon a certification or certifications of one or more licensed civil engineers (or such other documentation as the City Engineer deems appropriate in the circumstances) in making the determination as to the acreage of any specific Assessor’s Parcel.
“Assessor’s Parcel” means a lot or parcel shown in an Assessor’s Parcel Map with an assigned Assessor’s Parcel Number (APN).
“Assessor’s Parcel Map” means an official map of the County Assessor of the County of Solano designating parcels by Assessor’s Parcel Number. “Commercial Property” or “COM” means Developed Property used for commercial or industrial purposes other than property assigned to Land Use Designations SFR, SFV, MFR, MFV, CMV, SPC or EXE. This land use has improvement value according to the Solano County Secured roll. This land use type is assessed at 1.00 EBU per every 3,000 square feet of building square footage or portion thereof. “Developed Property” means all Assessors’ parcels within the Hiddenbrooke Maintenance Assessment District for which parcel data, from the most current Solano City of Vallejo
Hiddenbrooke Maintenance District
Engineer’s Report, FY 2024-2025

Page 7 ends

County Secured Roll available as of January 1 of the calendar year in which the Report is being prepared, shows improvement value on that property. “Equivalent Benefit Unit” or “EBU” means a basic measurement unit of benefit. A parcel with the SFR designation consists of one (1) EBU and is the baseline measure of benefit to which all other land use designations are compared within the HMD. EBUs are rounded to two (2) decimal places.
“Exempt Property” or “EXE” is a land use designation that identifies properties that are not assessed and are assigned 0.00 EBU. This land use classification may include, but is not limited to, lots or parcels identified as public streets and other roadways, dedicated public easements, open space areas and rights-of-way including greenbelts and parkways utility rights-of-way, common areas, sliver parcels and bifurcated lots or any other property that cannot be developed, park properties and other publicly owned properties that are part of the District improvements or that have little or no improvement value. These types of parcels are considered to receive incidental or no benefit from the improvements and are therefore exempted from assessment.
“Fiscal Year” is the City’s fiscal year beginning July 1 and ending June 30. “Golf Course Property” means any property planned under the Specific Plan to be used as a golf course and related or appurtenant facilities and improvements, including but not limited to a driving range and a clubhouse, which property is not assessed within the HMD. “HMD” is the abbreviation for Hiddenbrooke Maintenance District. “Hotel” or “HOT” means a structure or structures including Hotel Rooms and related facilities (including but not limited to restaurants and food service facilities, conference rooms and meeting halls) (i) operated for the accommodation of transient guests and including any hotel as defined in the California Civil Code or (ii) operated as a condominium hotel in accordance with the Specific Area Plan. This land use is assessed

0.15 EBU per Hotel Room on a developed lodging use-related parcel and 0.12 EBU per Hotel Room on an undeveloped, planned lodging use-related parcel. “Hotel Room” means each individual condominium unit or room within a Hotel designed to provide accommodations for transient guests or other occupants of the Hotel. “Improvement” means one or any combination of the following: (i) maintenance of regional park land, (ii) maintenance of parks and parkways, (iii) maintenance of open space, (iv) maintenance of streets (v) operation and maintenance of a welcome center (vi) provision of flood control and storm protection services, (vii) related facilities, along with appurtenances and appurtenant work deemed necessary for provision of services and maintenance and (viii) incidental expenses related thereto. “Multi-Family Residential” or “MFR” means Developed Property and is defined as a fully subdivided and developed residential parcel that has more than one residential unit developed on the property and has improvement value according to the Solano County Secured Roll data. This land use is assessed 0.90 EBU per dwelling unit. “Parcel” refers to an individual property assigned its own Assessment Number (Assessor’s Parcel Number—APN) by the Solano County Assessor’s Office. The Solano County Auditor/Controller uses Assessment Numbers and specific District Fund Numbers, to identify on the tax roll, properties assessed for special district benefit assessments.

City of Vallejo
Hiddenbrooke Maintenance District
Engineer’s Report, FY 2024-2025

Page 8 ends

“Planned Lot” is a land use defined as any property not subdivided with a specific number of proposed residential lots or dwelling units to be developed on the parcel where a final map has been recorded for the parcel.
“Publicly Owned Property” means any land within the Hiddenbrooke Maintenance Assessment District (i) conveyed or irrevocably offered for dedication to a public agency, (ii) which is encumbered by easements for the benefit of public entities or utilities which make impractical utilization of the real property for other than the purpose set forth in the easement.
“Single-Family Residential” or “SFR” means Developed Property and is defined as a fully subdivided and developed attached or detached residential, single-family property site with improvement value according to the Solano County Secured Roll data. This land use is assessed 1.00 EBU per lot or parcel. This is the base value that all other land use types are compared and weighted against (i.e. Equivalent Benefit Unit or EBU.) “Situs” means the property location address.
“Special Designation Property” or “SPC” is a land use designation factor defining undeveloped property that has more than one type of planned land use associated with it.

A common example of such a property is one in which the property includes planned, unsubdivided single-family residential lots and planned commercial structural development. This land use is assessed at 0.60 EBU per planned SFV lot and 0.60 EBU per 3,000 square feet (or portion thereof) of planned commercial building square footage.

This category also includes undeveloped property that has been subdivided but on which construction has not yet begun.
“Specific Plan” means Hiddenbrooke Specific Plan adopted by the City Council on September 15, 1987 amended September 26, 1995.
“Undeveloped Commercial Property” or “CMV” means Undeveloped Property zoned exclusively for commercial or industrial purposes other than property assigned to Land Use Designations SFR, SFV, MFR, MFV, COM, SPC or EXE. This land use has no improvement value according to the Solano County Secured roll. This land use type is assessed at 1.50 EBU per acre. Parcels less than 1 acre in this category are assigned a minimum of 1.50 EBU. Parcels over 50 acres are assigned a maximum of 75.00 EBU. “Undeveloped Multi-Family Residential” or “MFV” means Undeveloped Property that is an undeveloped residential, multi-family parcel without improvement value according to the Solano County Secured Roll data and includes a specific number of proposed dwelling units to be developed on the parcel (defined as a Planned Lot). This land use is assessed 0.60 EBU per proposed dwelling unit.
“Undeveloped Property” means all Assessor’s parcels within the Hiddenbrooke Maintenance Assessment District for which parcel data, from the most current Solano County Secured Roll available as of January 1 of the calendar year in which the Report is being prepared, shows no improvement value on that property. “Undeveloped Single-Family Residential” or “SFV” means Undeveloped Property and is defined as either 1) a fully subdivided yet undeveloped residential, single-family property lot or parcel without improvement value according to the Solano County Secured Roll data or 2) an unsubdivided, undeveloped residential, single-family parcel without improvement value according to the Solano County Secured Roll data which includes a specific number of proposed residential lots or dwelling units to be developed on the parcel City of Vallejo
Hiddenbrooke Maintenance District
Engineer’s Report, FY 2024-2025

Page 9 ends

(defined as a Planned Lot). This land use is assessed 0.60 EBU per subdivided lot, per proposed residential lot, or per proposed dwelling unit.

City of Vallejo
Hiddenbrooke Maintenance District
Engineer’s Report, FY 2024-2025

Page 10 ends

Fiscal Year 2024-2025 Estimate of Cost and Budget
Cost Estimates
As defined in the Municipal Code, the cost estimates for the Improvements include the following:
a) The total costs for improvements to be made this fiscal year, being the total cost of constructing or installing all proposed improvements and of maintaining and servicing all existing and proposed improvements, including incidental expenses. This may include an operating reserve, which shall not reasonably exceed the estimated costs of maintenance and servicing to January of the fiscal year, or whenever the City expects to receive its apportionment of special assessments and tax collections from the County, whichever is later. These estimated costs of maintenance and servicing typically include fixed landscape, open space and infrastructure items, as well as water, electricity and telephone utility items. The operating reserve fund can also be used to offset any unforeseen expenses during a given fiscal year, including, but not limited to, emergency repairs.
b) The amount of any surplus or deficit in the improvement fund to be carried over from the previous fiscal year
c) The amount of any contributions to be made from sources other than assessments levied pursuant to this part
d) The amount of the annual installment for the fiscal year Specifically, the budget includes, but is not limited to the following items:

Landscape Maintenance Contract – The landscaping contract is renewed annually and includes Landscape Maintenance, Open Space Management, Trail Maintenance, Tree Maintenance, Irrigation System Repairs, Waterfall Maintenance and Monuments as detailed below. Fiscal Year 2016-2017 the Landscape Maintenance Contract was put out to bid and awarded, as a result the costs for Landscape Maintenance services increased.

Landscape Maintenance - The ornamental landscape of Hiddenbrooke Parkway, Tot-lot on Bennington Drive Park and numerous irrigated landscape areas make up the maintenance component. The park is approximately one acre in size and has a mixture of lawn, paved areas and resting areas. A portion of the park (Parcel I) will remain in a natural state consistent with the mitigation measures for the Hiddenbrooke development.

City of Vallejo
Hiddenbrooke Maintenance District
Engineer’s Report, FY 2024-2025

Page 11 ends

Open Space Management – Open space management is overseen by the City. Fire prevention is included within the landscape maintenance contract. Adverse soil surface irregularities are repaired and funded by the Developer Deposit Fund. This Fund was a condition of development for any repairs of the open space.

Trail Maintenance – The City manages the trail maintenance service. Trail maintenance is scheduled annually through the maintenance contract.

Tree Maintenance – Tree pruning and care will be performed on a rotating schedule as necessary to keep trees healthy, maintain the urban canopy and avoid unexpected tree limb breakage. An occasional tree replacement is also covered by this budget line but a large number or replacements would be included in the Rehabilitation Reserves budget.

Irrigation Systems Repairs – This budget item provides for the ongoing maintenance and repair of the existing irrigation system to ensure that it is properly functioning at all times.

As the systems age, larger scale preventative replacements and upgrading to systems that provide more efficient use of water may be done.

Waterfall Maintenance Contract - Beginning 2015-16 the waterfall maintenance contract is a part of the landscape maintenance contract.

Monuments – This budget item provides for the ongoing maintenance of monument landscape and irrigation throughout the district.

Salaries and Benefits – Staff time devoted to managing and inspecting Districts. The Public Works LMD reimbursement is proportionally spread amongst twenty-seven (27) Districts based on each District’s budgeted direct and maintenance expense, inspections as a percentage of total costs in these categories for all Districts. Inspection costs are budgeted directly to the District as Field Inspection based on the historical and projected time spent in the inspection efforts.

Services & Supplies - Vehicles, supplies and services devoted to managing and inspecting Districts.

Capital Projects – This item includes major repairs or capital improvement projects.

Landscape Rehabilitation & Vandalism — Landscape Rehabilitation includes landscape projects, which significantly benefit and upgrade HMD. These cost reflect only a proportional share of the entire cost of the project and are noted because the amount of design, planning, coordination and execution. This budget item represents a cost which has been identified by the city as above normal routine landscape maintenance inspection.

City of Vallejo
Hiddenbrooke Maintenance District
Engineer’s Report, FY 2024-2025

Page 12 ends

Vandalism - Includes repairs and rehabilitation that are generally unforeseen and not normally included in the yearly maintenance contract costs. This may include repair of damaged amenities due to vandalism, storms, frost, etc. These upgrades could include replacing plant materials and/or renovation of irrigation or lighting systems.

Utility – Includes the cost of water, electricity, and telephone. Amounts are budgeted based on historical usage and costs, considering published or projected rate increases for Vallejo Water, Vallejo Sanitation and PG&E. Water costs for the HMD include irrigation, the waterfall and the Welcome Center bathroom. Electricity costs include support for the irrigation systems, lights at the entry, Welcome Center lighting, and holiday tree lighting for the olive grove at the entry.

Utility Corridor Maintenance – All wet utilities come through the utility corridor and it is HMD’s emergency exit in the event Highway 80 closed. The utility corridor is maintained by the HMD and includes road surfacing and roadway improvements.

Welcome Center and Miscellaneous Repairs - The Welcome Center Agreement specifies the required expenses to staff the facility with “Greeters” and Security personnel and provide roving patrols as directed by the Hiddenbrooke Property Owners Association (HPOA), which has been charged with directing the activity/operations of the Welcome Center. The Agreement will be annually renewable, subject to the consent of the service provider and the City. An annual allowance is included in the general budget for touch up painting, security camera systems or other items necessary to operations of the Welcome Center. If for any reason the Welcome Center should no longer be funded or desired in the future, the HMD Developer Deposit Fund may be used to cover the cost of removal.

Napa County Street System Maintenance – Approximately ½ mile of the entrance roadway, Hiddenbrooke Parkway, is situated in Napa County. As a condition of the District development, maintenance of this portion of the road will not be undertaken by Napa County. The District can expect to request and receive a high level of street maintenance services, above what the City normally provides under the General Fund.

Storm Water Management – The District was mandated in the Conditions of Approval for runoff emptying into Lake Herman, the emergency back-up reservoir for the City of Benicia. This condition was initiated by the City of Benicia for water quality monitoring services, which is being provided by the Vallejo Sanitation and Flood Control District.

Professional Services – This is the estimated cost to the District for the Assessment Engineer to prepare this report and to calculate and submit the assessments to the Solano County Auditor’s office.

City of Vallejo
Hiddenbrooke Maintenance District
Engineer’s Report, FY 2024-2025

Page 13 ends

County Administrative Services – This is the amount charged by the County for the cost of processing and collecting the annual levy on the property tax billings and remitting funds to the City of Vallejo. It is based on the total levy.

Administration & Overhead – The cost allocation of all particular departments and staff of the City, for providing general support, services and operations related to the various districts, enterprises and accounts of the City.

Number of District Parcels: This is the number of assessable parcels within a particular district. This number does not include exempt or non-taxable parcels.

District Direct Cost: This is the sum total of the regularly budgeted direct costs for the District. The total direct costs include the budgeted expenses for: Maintenance, Water, Utilities, Vandalism/Natural Damage, and Special Maintenance/Services. The amount budgeted for Improvements/Rehabilitation reserve is not included in this dollar amount.

Geotechnical Monitoring/Maintenance – As a Condition of Approval the District is required to monitor slope stability. Funds are reserved to monitor slope movement, remove or repair landslides and any condition for which the District should require the services of a geologist or soil engineer. The Hiddenbrooke project was approved with Resolution 87-613 Tentative Map 88-10 (dated 1-19-1988) and Specific Area Plan (dated 1987). These documents require only a determination of the adequacy of the landslide repair but do not state to what degree of effort is needed.

Fund Balances
The HMD has its own improvement fund to be accounted for separately from all other City funds. All moneys representing special assessments, installment payments, contributions and annual interest earned and surplus/deficits from prior years’ expenses and revenues are deposited into this fund. The HMD divides the improvement fund into the following four (4) funds: the HMD Developer Deposit Fund, the HMD Rehabilitation Fund, the HMD Operating Reserve Fund, and the HMD Undesignated Reserve Fund.

Annual revenues that exceed the cost of annual operations will be deposited into the reserve funds to be used for future City Council approved projects and expenditures. City staff is currently working with the Hiddenbrooke HPOA’s HMD Advisory Committee to update the five (5) year Capital/Rehabilitation plan. The City can draw from the Rehabilitation Fund, as part of the improvement fund, only as necessary to cover the District improvements should the Undesignated Reserve Fund or current year budget be insufficient.

City of Vallejo
Hiddenbrooke Maintenance District
Engineer’s Report, FY 2024-2025

Page 14 ends

HMD Developer Deposit Fund
The developers of Hiddenbrooke deposited $600,000 into the HMD Developer Deposit Fund during the 1999-2000 Fiscal Year for any remediation work required within the Hiddenbrooke development or the Utility Corridor (UC) between Columbus Parkway and Hiddenbrooke. The fund will ensure the ability of the HMD to repair adverse land movement or impacts to improvements within the broader HMD areas and the Utility Corridor such as: debris flows, landslides, slope re-grading due to erosion or earth movement, Utility Corridor monitoring/maintenance or slope repair, and maintenance or resurfacing of the a/c village trail due to expansive soil.

The Utility Corridor links Hiddenbrooke with St John’s Mine Road and is the responsibility of the Hiddenbrooke development. The corridor has suffered erosive damage due to the annual discharge of precipitation storm water from the Utility Corridor slopes and roadway. The UC lies within the Solano Land Trust Swett Ranch, formerly the PG & E properties and is entitled with a construction and maintenance easement which encumbers the UC. Approximately $168,000 has been spent since 2007 on engineers and consultants to develop a plan to remediate the corridor, but no actual work has been done.

The HMD Developer Deposit Fund balance can and does grow beyond the original $600,000 deposit. This deposit is subject to interest earnings. The City is allowed to invest this deposit in an interest bearing account and the resulting interest earnings are deposited directly to the HMD Developer Deposit Fund. The approximate interest earnings since the original deposit are represented in the Reserve Fund Information table located on the following pages.

HMD Rehabilitation Fund
The Rehabilitation Fund was originally designated for repairs to the Napa County Road, Debris Flow Cleaning, Slide Re-grading, and maintenance or slope repair of the Utility Corridor Access Road. In FY 2003-2004, the HMD Rehabilitation Fund was designated only for repairs to the Napa County portion of Hiddenbrooke Parkway and the other descriptive items were determined to be available for funding from the HMD Developer Deposit Fund. Beginning with FY 2010-2011, the purpose of the HMD Rehabilitation Fund has been expanded to include the Napa County Road section and all other renovation and rehabilitation to landscape and irrigation systems within the HMD; effectively anything that is not in the Open Space areas or Utility Access or Utility Easements in the hillsides.

City of Vallejo
Hiddenbrooke Maintenance District
Engineer’s Report, FY 2024-2025

Page 15 ends

The City Public Works Department has established $1 million as the cap for the sum total of the HMD Developer Deposit Fund, adjusted by the percentage increase in the Consumer Price Index for All Urban Consumers (CPI-U), as distributed by the Bureau of Labor Statistics (BLS) for the Consolidated Metropolitan Statistical Area (CMSA) covering San Francisco-Oakland-San Jose. The percentage increase will be from February 1 of the prior year to February 1 of the current year, or similar time period.

The adjusted Developer Deposit Fund cap for Fiscal Year 2023-2024 has been adjusted from $1,800,981 to $1,896,433 (5.30 Percent). In February 2024, this figure was adjusted accordingly to reflect the current percentage change in the Local CPI. According to the City Finance Department, the current total of the HMD Developer Deposit Fund has not reached this cap. The estimated FY 2023-2024 ending balance for both Funds is $2,929,317, including the $869,404 Developer Deposit Fund and $2,059,913 Rehabilitation Fund.

The percentage change in the Local CPI that was applied to the Funds cap for Fiscal Year 2024-2025 is 2.37 Percent. Therefore, the cap for FY 2024-2025 is $1,941,379. The estimated FY 2024-2025 ending balance for both Funds, including interest earnings, is $2,747,129. These figures are presented in the Reserve Fund Information table that follows this section.

HMD Operating Reserve Fund
The HMD Operating Reserve Fund provides for operating expenses through January of the fiscal year or until such time as the City receives its apportionment of special assessments from Solano County, whichever is later. It is also a fund that can be accessed should the District experience unforeseen damages or emergencies to improvements.

Based on City data regarding the District fund balance information, the estimated ending Operating Reserve Fund balance as of June 30, 2024 will be $464,482. The target Operating Reserve Fund balance for June 30, 2025 is based on 50% of the total costs or $464,482.

City of Vallejo
Hiddenbrooke Maintenance District
Engineer’s Report, FY 2024-2025

Page 16 ends

Description 2024-25 Budget
Direct Costs
Landscape, Open Space & Infrastructure
Fixed
Landscape Maintenance Contract $165,308
Salaries & Benefits $154,510
Services & Supplies $19,161
District Upkeep
Capital Improvements $0
Landscape Rehabilitation / Vandalism / Tree Maintenance $105,000 Utility
Water $95,142
Electricity $15,600
Telephone $1,500
Total Lanscape, Open Space & Infrastructure Costs $556,221 Utility Corridor Maintenance $0
Total Direct Costs $556,221
Indirect Costs
Agreement & Easement Responsibilities
Welcome Center $272,075
Napa County Roadway (Street System) $0
VSFCD Storm Water Management $0
Misc. Repairs to Welcome Center Interior / Exterior $0
Professional Services $4,108
Administration & Overhead $92,210
County Administrative Services $7,210
General Fund Contribution (Welcome Cntr, Napa Cnty Road, Trail) ($2,860) Total Indirect Costs $372,743
Total Annual Direct and Indirect Costs $928,964
Reserve Fund Collection
Operating / Rehabilitation Reserve Fund
Annual Collection/(Transfer) ($207,937)
Developer Deposit Fund
Annual Collection/(Transfer) $0
Total Reserve Fund Collection / (Transfer) ($207,937)
Total Balance to Levy $721,027
District Statistics
Total Parcels 1,222
Total Parcels Levied 1,222
Total Equivalent Benefit Units 1,180.00
Proposed Levy per Benefit Unit $611.04
Maximum Levy per Benefit Unit $932.31
Total Assessment $721,027.20
City of Vallejo, Hiddenbrooke Maintenance District
Estimate of Cost
City of Vallejo
Hiddenbrooke Maintenance District
Engineer’s Report, FY 2024-2025

Page 17 ends

Description Total
Reserve Funds Information
HMD Developer Deposit Fund
Estimated HMD Developer Deposit Fund Balance as of June 30, 2024 $869,404 Estimated Interest Earnings on Original Developer Deposit (FY24-25) $8,694 Estimated Developer Deposit Fund Collection/(Transfer) (FY24-25) $0 Estimated HMD Developer Deposit Fund Balance as of June 30, 2025 $878,098 HMD Rehabilitation Fund
Estimated HMD Rehabilitation Fund Balance as of June 30, 2024 $2,051,805 Estimated Interest Earnings on Rehabilitation Fund (FY24-25) $25,163 General Fund Contribution (Welcome Center, Trail, Napa County Road) $2,860 Estimated Rehabilitation Fund Collection/(Transfer) (FY 24-25) ($210,797) Estimated HMD Rehabilitation Fund Balance as of June 30, 2025 $1,869,031 Estimated HMD Rehabilitation and Developer Deposit Fund Balance as of June 30, 2025 $2,747,129
HMD Operating Reserve Fund
Estimated HMD Operating Reserve Fund Balance as of July 1, 2024 $464,482 Estimated Operating Reserve Transfer to Developer Deposit Fund (FY 24-25) $0 Estimated Operating Fund Collection/(Transfer) (FY 24-25) $0 Estimated HMD Operating Reserve Fund Balance as of June 30, 2025 $464,482 HMD Undesignated Reserve Fund
Estimated HMD Undesignated Reserve fund Balance as of July 1, 2024 $0 Estimated Undesignated Reserve Collection/(Transfer)
Estimated HMD Undesignated Reserve fund Balance as of June 30, 2025 $0 Estimated Total HMD Reserve Fund Balance as of June 30, 2025 $3,211,611 City of Vallejo
Hiddenbrooke Maintenance District, Reserve Fund Balances FY 2024-25 City of Vallejo
Hiddenbrooke Maintenance District
Engineer’s Report, FY 2024-2025

Page 18 ends

Method of Apportionment
Method of Apportionment
This section of the Engineer's Report explains the special and general benefits to be derived from the installation, maintenance and servicing of Improvements located throughout the District, and the methodology used to apportion the total assessment to properties within the District.

The District consists of all Assessor Parcels within the boundaries of Sky Valley Unit I, Sky Valley Unit II and Orchards development. The parcels include all privately or publicly owned parcels within said boundaries. The method used for apportioning the assessment is based upon the proportional special benefits to be derived by the properties in the District over and above general benefits conferred on real property or to the public at large. The apportionment of special benefit is a two-step process: the first step is to identify the types of special benefit arising from the improvements, and the second step is to allocate the assessments to property based on the estimated relative special benefit for each type of property.

Discussion of Benefit
In summary, the assessments can only be levied based on the special benefit to property.

This benefit is received by property over and above any general benefits. With reference to the requirements for assessments, Section 22573 of the Landscaping and Lighting Act of 1972 states:
"The net amount to be assessed upon lands within an assessment district may be apportioned by any formula or method which fairly distributes the net amount among all assessable lots or parcels in proportion to the estimated benefits to be received by each such lot or parcel from the improvements." Proposition 218, which added Article XIIID of the California Constitution, provides as follows:
"No assessment shall be imposed on any parcel which exceeds the reasonable cost of the proportional special benefit conferred on that parcel." City of Vallejo
Hiddenbrooke Maintenance District
Engineer’s Report, FY 2024-2025

Page 19 ends

Benefit categories have been established that represent the types of special benefit to residential, commercial, industrial and other lots and parcels resulting from the installation, maintenance and servicing lighting and landscaping improvements to be provided with the assessment proceeds. These categories of special benefit are summarized as follows:

A. Proximity to Improved Landscaped Areas and Other Public Improvements within the Assessment Districts.

B. Access to Improved landscaped areas and Other Public Improvements within the Assessment Districts.

C. Improved Views within the Assessment Districts.

D. Extension of a property’s outdoor areas and green spaces for properties within close proximity to the Improvements.

E. Creation of individual lots for residential and commercial use that, in absence of the assessments, would not have been created.

F. Drainage of water and runoff from property in the District.

G. Protection from flooding and standing water due to the improved drainage systems.

Case law interpreting Proposition 218 provides enhanced clarity to the definitions of special benefits to properties in three distinct areas:
 Proximity
 Expanded or improved access
 Views
This case law also clarifies that a special benefit is a service or improvement that provides a direct advantage to a parcel and that indirect or derivative advantages resulting from the overall public benefits from a service or improvement are general benefits. The case law also provides specific guidance that park improvements are a direct advantage and special benefit to property that is proximate to a park that is improved by an assessment:

The characterization of a benefit may depend on whether the parcel receives a direct advantage from the improvement (e.g. proximity to a park) or receives an indirect, derivative advantage resulting from the overall public benefits of the improvement (e.g. general enhancement of the district’s property values).

Proximity, improved access and views, in addition to the other special benefits listed above further strengthen the basis of these assessments.

City of Vallejo
Hiddenbrooke Maintenance District
Engineer’s Report, FY 2024-2025

Page 20 ends

General versus Special Benefit
In absence of the assessments, the Improvements in the District would not be provided, so the Improvements are “over and above” what otherwise would be provided. Many of the parcels would not even exist if the assessments were not established because an assessment for the specific Improvements within the Districts was a condition of development approval.

All of the Assessment proceeds derived from the District will be utilized to fund the cost of providing a level of tangible “special benefits” in the form of landscaped parkways, landscaped medians, landscaped corridors, trail systems, drainage facilities, other Improvements and costs incidental to providing the Improvements and collecting the Assessments.

Although these Improvements may be available to the general public at large, the permanent public Improvements in the District were specifically designed, located and created to provide additional and improved public resources for the direct advantage of property inside the District, and not the public at large. Other properties that are either outside the District or within the District and not assessed, do not enjoy the unique proximity, access, views and other special benefit factors described previously.

Moreover, the homes in the District would not have been built if the Assessments were not established because an assessment for the Improvements was a condition of development approval.

Benefit Finding
In summary, real property located within the boundaries of the District distinctly and directly benefits from closer proximity, access and views of Improvements funded by the Assessments, the creation of developable parcels and the extension of usable land area provided by the assessments. The Improvements are specifically designed to serve properties in the District, not other properties or the public at large. The District has been narrowly drawn to include those parcels that receive a direct advantage from the Improvements. The public at large and other properties outside the District receive only limited benefits from the Improvements because they do not have proximity, good access or views of the Improvements. These are special benefits to property in the District in much the same way that sewer and water facilities, sidewalks and paved streets enhance the utility and desirability of property and make them more functional to use, safer and easier to access.

City of Vallejo
Hiddenbrooke Maintenance District
Engineer’s Report, FY 2024-2025

Page 21 ends

Without the Assessments, the public improvements within the District would not be maintained and would turn into brown, unmaintained and unusable public improvements and public lands. If this happened, it would create a significant and material negative impact on the desirability, utility and value of property in the District. Most importantly, without the Assessments, the developed properties would not exist, because the subdivisions and development proposals would not have been approved. The Improvements are, therefore, clearly above what otherwise would be provided and the Improvements uniquely and specially benefit parcels in the District in a way that is not enjoyed by the general public or other property. We therefore conclude that all the Improvements funded by the Assessment are of special benefit to the identified benefiting properties located within the District and that the value of the special benefits from such Improvements to property in the District reasonably exceeds the cost of the Assessments for every assessed parcel in the District. (In other words, as required by Proposition 218; the reasonable cost of the proportional special benefit conferred on each parcel reasonably exceeds the cost of the assessments.) Any general benefits to surrounding properties outside of the District, if there were any, are collateral and conferred concomitantly.

The Hiddenbrooke development has a single access/egress from Interstate 80. All of the improvements to be maintained within the development (with the exception of regional trail facilities which is 50% special benefit) have been constructed specifically for the benefit of the properties within the development and the maintenance of these improvements is by definition of special benefit to these properties. The location of a property within the District and its relative benefits from District improvements is addressed in the following:

Utility Corridor – With exception of routine maintenance or repair of the water line or forced main sanitary sewer line by the Water Division or Vallejo Sanitation & Flood Control District, all other appurtenances within the Slope Grading, Maintenance and Drainage Easement enclosing the Corridor are the responsibility of the HMD. The Corridor is considered the emergency access out of the development should a catastrophic event make Hiddenbrooke Parkway impassible. Any slope monitoring, remedial earthwork for slide repairs, concrete ditch cleaning or repair, storm drains or drop inlets, weed control, erosion control, pavement and roadway maintenance or resurfacing, road settlement, gates or fencing, etc, as identified, within the Sky Valley Offsite Utilities Improvement Plans is the responsibility of the HMD. Amounts budgeted but not spent in any fiscal year will be added to the HMD Rehabilitation Fund balance.

Debris Basins – V.M.C. Chapter 12.40.010 for Excavating, Grading and Filling required the elimination of hazards such as mudflows, erosion, flooding, etc. The Basins are designated for the safety of the residents residing in prone areas, should a flow event occur. Basins minimize the loss of life and property to the Hiddenbrooke residents. The four (4) Basins are identified on the Sky Valley Phase 2 Record Drawing Grading Plans and are the responsibility of the HMD.

City of Vallejo
Hiddenbrooke Maintenance District
Engineer’s Report, FY 2024-2025

Page 22 ends

Storm Water Management - The monitoring of the lakes is of special benefit to all properties within the HMD. This special benefit is independent of parcel location because all of the properties drain to the lakes.

Napa County Street System Maintenance - The maintenance of approximately ½ mile of the Hiddenbrooke Parkway (entrance roadway) is of special benefit to properties within the HMD because it is the single access/egress to the development. No gas tax is appropriated to the City of Vallejo for this section of roadway and the agreement with Napa County provides that Napa County will not pay for the maintenance of this street. Therefore, the burden of maintaining this street falls upon the HMD. The benefit to the properties within the HMD is the satisfaction of this obligation. That portion of Hiddenbrooke Parkway that lies outside of the HMD boundaries and in Napa County is considered a general benefit. This general benefit is estimated to be 25% of the total maintenance costs and the City will make a contribution in the amount necessary to offset this general benefit cost. Amounts budgeted but not spent in any fiscal year will be added to the HMD Rehabilitation Fund balance.

Open Space Maintenance - The maintenance services to be performed on open space include fence repairs, fire access road repairs, erosion control, noxious weed control, sign repairs, fire breaks, ditch cleaning and associated staff costs. These services are of special benefit to the properties within the HMD in as much as they provide for property safety, preserve the natural tranquility and beauty of the Hiddenbrooke environment and provide recreational opportunities such as hiking and walking for the benefit of the residents and employees in the community.

Open space literally surrounds the Hiddenbrooke development and is equally accessible to all properties within the HMD. Whether a property faces or backs up to open space is a matter of personal preference. The benefits of owning property next to open space (views, serenity, direct access, etc.) are generally offset by the nuisance factors such as litter and increased foot traffic. Maintenance of firebreaks is of equal benefit to properties across the street as to those who back up to open space. The intense heat of wild fires causes them to jump streets as was seen in the Oakland Hills fire of 1991. Thus, the relative location of parcels within the HMD is seen not to impact the relative benefit received by the various properties.

Trail Maintenance - The trail system and trailhead are open and accessible to the general public as well as to the HMD property owners, but trail systems are predominately used by those who live near them and therefore provide special benefits to local property owners. However, based on discussions with East Bay Regional Parks personnel, it has been determined that these trails may be used by residents of HMD and outsiders in equal numbers. Therefore, at present only 50% of the cost of trail maintenance has been assessed to the properties within the HMD as special benefit. Cost estimates and allocation of special benefit may vary as the trail system and surrounding properties are developed. The reallocation of special benefit will be based on the location and extent of the trail system as it relates to the surrounding properties.

Landscape Maintenance - Parkway and neighborhood entrance maintenance services are of equal benefit to all properties within the HMD because all properties access the community via Hiddenbrooke Parkway. Landscaped areas and street trees are distributed throughout the development and provide equal environmental and aesthetic benefits to similar parcels. Although landscape improvements (by virtue of their location), may be visible to surrounding properties or to the public at large, any benefit to surrounding properties is City of Vallejo
Hiddenbrooke Maintenance District
Engineer’s Report, FY 2024-2025

Page 23 ends

incidental and cannot be considered a direct and special benefit to those properties. Therefore, it has been determined that the landscape improvements associated with the District and the ongoing operation and maintenance of those improvements are clearly a direct and special benefit to properties within the District and provide no measurable general benefit to properties outside the District or to the public at large.

Geotechnical Monitoring & Maintenance - This service is not related to parcel location because areas subject to slides are within the open space parcels. Funds will be accumulated and applied as needed if and when an event occurs. In this sense, the funds are “insurance” for the benefit of all properties independent of location.

Welcome Center - The location of a property within the HMD relative to the Welcome Center is not considered to be a factor in determining special benefit because the Hiddenbrooke development has a single access and egress to and from Interstate 80. The Welcome Center is strategically located at the entrance to the HMD. The Welcome Center is of equal benefit to all properties. The operation and maintenance of the Welcome Center will provide for a friendly point of access and departure to the HMD. A well-maintained center with a well-trained staff will be a significant asset to the HMD. The greeters and security personnel will provide directions to visitors and will keep a watch out for the safety of residents, businesses and their respective visitors and guests. A well-trained staff will be available to provide reasonable assistance to property owners in times of emergency.

However, it is also recognized that the Welcome Center will be of benefit to those members of the public who use the trail system. No specific data regarding the use of the HMD trails by persons from outside the HMD is currently available, but it is reasonable to gauge the use of the trail system by the general public on the size of the staging area. Based on a staging area that will accommodate 25 vehicles an estimated 50 trips per day will be made by the general public. It is estimated that at build out there will be 1,200 EBUs within the HMD. Assuming an ADT (average daily traffic) of 9.55 trips per day per EBU, the development will generate 9,770 vehicle trips per day. Visitors passing through the Welcome Center will generate 50/9,700 or approximately 0.5% of the total ADT. It is reasonable to say that 0.5% of the overall benefit derived from the additional improvements is “General Benefit”. This benefit is not special to the owners of the HMD and may not be assessed. A contribution by the City in the amount of

0.5% of the total cost of maintaining the Welcome Center will be allocated as general benefit and not assessed to property owners within the HMD.

Passive Park - The location of property within the HMD is not considered to be of consequence in determining special benefit because the park is centrally located and easily accessible to all properties within the HMD. Moreover, the increased benefit of owning property near to the park is generally offset by the nuisance factors such as litter and increased foot traffic that the park generates. A well maintained park is esthetically pleasing. It approves property appearance and will enhance the HMD community image. If the park is not well maintained it will have the opposite effect. The park will provide passive recreational opportunities such as walking and outdoor reading for the enjoyment and benefit of all residents and employees of the HMD.

Waterfall Maintenance - Waterfall maintenance services are of equal benefit to all properties within the HMD because all properties access the community via City of Vallejo
Hiddenbrooke Maintenance District
Engineer’s Report, FY 2024-2025

Page 24 ends

Hiddenbrooke Parkway and have visible access to the waterfall. The waterfall amenity provides equal environmental and aesthetic benefits to all parcels within the HMD.

Although waterfall improvements may be visible to surrounding properties or to the public at large, any benefit to surrounding properties is incidental and cannot be considered a direct and special benefit to those properties. Therefore, it has been determined that the waterfall improvements associated with the District and the ongoing operation and maintenance of those improvements are clearly a direct and special benefit to properties within the District and provide no measurable general benefit to properties outside the District or to the public at large.

Incidental Expenses - The incidental expenses associated with the various maintenance services provided are distributed in proportion to the foregoing and are therefore unrelated to parcel location.

General benefit is identified as that benefit received by properties outside of the District. General benefit cannot be assessed to property within the District boundary. A summary of the general benefit contributions is illustrated in the following table.

Agency Description % of Budgeted Expenditures
City Street System Maintenance 25.0%
GVRD Trail System 50.0%
City Welcome Center Cost 0.5%
The original determination of benefits to property and the method of special benefit apportionment to property were developed by Willdan Financial Services when the HMD was reconstructed in fiscal year 2002-2003. The description of benefits and the determination and apportionment of benefits to property in this Report are consistent with the original benefit determination and apportionment. The original method of apportionment of assessment and other relevant elements of the fiscal year 2002-2003 Engineer’s Report for the HMD are hereby incorporated by reference.

The maintenance and servicing of these improvements is also partially funded, directly and indirectly from other sources including City of Vallejo, the County of Solano and the State of California. This funding comes in the form of grants, development fees, special programs, and general funds, as well as direct maintenance and servicing of facilities (e.g. transportation facilities, other infrastructure, etc.) Finally, this funding from other sources more than compensates for general benefits, if any, received by the properties within the assessment districts.

City of Vallejo
Hiddenbrooke Maintenance District
Engineer’s Report, FY 2024-2025

Page 25 ends

Method of Assessment
The method of apportionment for the District calculates the receipt of special benefit from the respective improvements based on the actual or proposed land use of the parcels within the District. The net amount to be assessed upon parcels within the District is apportioned by a formula and method that fairly distributes the net amount to be assessed among all assessable parcels in proportion to the special benefits to be received by each parcel from the improvements. Additionally, in compliance with Article XIIID Section 4 of the State Constitution each parcel’s assessment does not exceed the reasonable cost of the proportional special benefit conferred to that parcel. The benefit formula used to determine the assessment obligation is therefore based upon both the improvements that benefit the parcels within the District as well as the proposed land use of each property as compared to other parcels that benefit from those specific improvements.

Equivalent Benefit Units
The special benefits received by each parcel within the District and each parcel’s proportional annual assessment is calculated on the basis of a formula known as Equivalent Benefit Units. The Equivalent Benefit Unit (EBU) method of apportionment establishes a proportional benefit relationship between the various parcels within the District and the improvements provided by the District. The EBU assigned to each parcel utilizes a set formula and proportional weighting factors based on the land use, size and development status of each parcel within the District compared to other parcels within the District.

Equivalent Benefit Unit Application by Land Use
Developed Residential Land
In order to evaluate the special benefits received by the various types of land, it makes sense to look at the benefits received by residential land because this is by far the largest category. The benefit received by residential land does not vary significantly, if at all, in direct proportion to lot size. There is no direct correlation or readily available dwelling density data by residential lot size that illustrate that larger lots support an increased (or decreased, for that matter) number of persons per dwelling unit. Therefore, all developed single-family residential lots or parcels receive an equal amount of special benefit from the improvements financed through the HMD and are deemed to receive 1.00 EBU.

All developed multi-family residential parcels are deemed to receive 0.90 EBU per dwelling unit. This is because density per dwelling unit figures for multi-family units in the City of Vallejo are approximately ten percent (10%) less than density figures for singlefamily homes. According to the Census 2000 data for the City of Vallejo obtained from the Association of Bay Area Governments (ABAG), the average household size of an owneroccupied unit in Vallejo is 2.99 persons. The average household size of a renter-occupied unit is 2.76. Assuming that most owner-occupied units are single-family residential homes and most renter-occupied units are multi-family dwelling units, there is an eight percent City of Vallejo
Hiddenbrooke Maintenance District
Engineer’s Report, FY 2024-2025

Page 26 ends

(8%) difference in densities between single family and multi-family dwelling units. For ease of levy administration, the City has decided to round the percentage difference to ten percent (10%). Therefore, the EBU count for developed multi-family dwelling units is 0.90 EBU.

Developed Commercial Property
Commercial property, developed or undeveloped, does receive measurable special benefit from the improvements maintained through this District. Well-maintained improvements add aesthetic value to the property and enhance the desirability of the property, which may attract patrons and prospective buyers. For this District, a commercial or industrial parcel that has an improved commercial or industrial use structure receives 1.00 EBU of special benefit for every 3,000 square feet (or fraction thereof) of improved structure. For undeveloped commercial properties, the special benefit is identified as 0.60 EBU per 3,000 square feet (or fraction thereof) of planned improved structure.

Undeveloped Land
Public improvements within the HMD have been constructed throughout. The maintenance of these public improvements is of special benefit to all of the land in this planned community. Some land will be developed immediately, buildings will be constructed and families will move in. Other land may remain undeveloped, i.e. without buildings, for a number of years. There is a difference between special benefit received by developed and undeveloped land. When land is undeveloped or vacant, the special benefit received is less than that received by a developed parcel (one with a building). This is because only a minimum level of service is necessary in order to save the HMD improvements from degradation and destruction. For example, watering and weed control is necessary for plant survival along the Hiddenbrooke Parkway. Trails must be maintained or they will be lost.

There will be geotechnical costs for slope monitoring with or without development. A minimal effort to maintain open space including trails will be necessary for marketing purposes. Firebreaks, on the other hand, are not necessary until structures are built. This minimum level of maintenance activity will be essential to property owners in order to market (sell) lots. The benefit for undeveloped residential land is considered to be 60 percent of developed single-family residential land. Therefore, undeveloped single-family residential land is considered to receive 0.60 EBU per planned lot. After buildings are constructed and occupied, increased maintenance services will be required, e.g. increased litter removal, fire protection, trail maintenance, pruning, watering and weed abatement.

However, for improvements such as the Welcome Center, the benefit to developed and undeveloped lots is the same.

Exempt Property
Public property, which is maintained for the benefit of the properties within the HMD, does not benefit from these services. For example, open space does not benefit from the maintenance of open space. Sanitary and water pumping stations are for the benefit of the HMD properties. These facilities exist only to service the HMD. If the property does not develop then the facilities will be abandoned. In summary, there are no public agency parcels in the HMD which are perceived to benefit from the improvements.

Public open space does not benefit from the services provided by the HMD and is therefore not assessed. Services performed on the land such as fire abatement are for the protection of the developed private parcels. Open space that is held in public trust may not be transferred or sold for profit and as such does not appreciate in value due to the HMD improvements. Open space maintenance services are performed because of the development. If there were no development, then minimal maintenance of open space would be required. Any revenue or in-kind services afforded to the open space by grazing leases will be credited to future open space budgets.

City of Vallejo
Hiddenbrooke Maintenance District
Engineer’s Report, FY 2024-2025

Page 27 ends

The Vallejo Sanitation and Flood Control District’s sanitary sewer and storm drain facilities and the City’s water system facilities are operated and maintained exclusively for the benefit of the Hiddenbrooke development. They exist only for the benefit of the Hiddenbrooke development and receive no special benefit from the HMD improvements.

The Golf Club Property was excluded from the HMD because they are responsible contractually for lake monitoring and cleaning, and for slide debris removal, resulting from slides within the open space onto the golf course. These services are to be performed by and at the sole discretion of the Golf Course Owners. The open space Golf Course properties do not benefit from the HMD improvements and consequently are not assessed.

As such, the Golf Course properties and appurtenant facilities cannot benefit from District funds, maintenance and improvements until such time as they are brought within the District by assessing the properties for its appropriate share of District costs.

Public streets, public avenues, public utilities, public lanes, public roads, public drives, public courts, public alleys, all public easements and rights of way do not benefit and have not been assessed. Public parks, greenbelts and parkways and all public school property, other public property, and designated open space are assessed only to the extent that they benefit as discussed above. The benefit received by privately owned common areas is considered as included in the assessment for the various dwelling units. Common areas have therefore been assigned zero EBUs.

Assessment Range Formula
Any new or increase in assessments require certain noticing and meeting requirements by law. Prior to the passage of Proposition 218, legislative changes in the Brown Act defined the definition of “new or increased assessment” to exclude certain conditions. These conditions included “any assessment that does not exceed an assessment formula or range of assessments previously adopted by the agency or approved by the voters in the area where the assessment is imposed.” This definition and conditions were later confirmed through SB919 (Proposition 218 implementing legislation).

The purpose of establishing an assessment range formula is to provide for reasonable increases and inflationary adjustment to annual assessments without requiring costly noticing and mailing procedures, which could add to the District costs and assessments.

Property owner balloting for the proposed District assessment in Fiscal Year 2003-2004 and 2004-2005 for Annexation 1 included the approval of an assessment range formula.

The assessment range formula shall be applied to all future assessments within the District.

Generally, if the proposed annual assessment (levy per unit or rate) for the current fiscal year is less than or equals the “Maximum Assessment” (“Adjusted Maximum Assessment”), then the proposed annual assessment is not considered an increased assessment. The Maximum Assessment is equal to the initial Assessment approved by property owners adjusted annually by the following criteria:

1. In the Report prepared for ballot proceedings conducted in July 2003, the maximum amount of assessment levied per EBU for Fiscal Year 2003-04 was established at $532.22, with the exact amount to be levied in any given year to be determined by the budget for that year. Beginning in the second fiscal year (Fiscal Year 2004-2005) and each fiscal year thereafter, the Maximum Assessment will be recalculated annually to adjust for the property owner approved inflation adjustment factor.

City of Vallejo
Hiddenbrooke Maintenance District
Engineer’s Report, FY 2024-2025

Page 28 ends

2. The new adjusted Maximum Assessment for the year represents the prior year’s Maximum Assessment adjusted by the percentage increase in the Consumer Price Index for All Urban Consumers (CPI-U), as distributed by the Bureau of Labor Statistics (BLS) for the Consolidated Metropolitan Statistical Area (CMSA) covering San FranciscoOakland-San Jose. The percentage increase will be from Feb 1 of the prior year to Feb 1 of the current year, or similar time period that is available when the Report is prepared.

3. The Maximum Assessment is adjusted each year independently from the annual assessment. While the actual amount assessed may fluctuate each year, the maximum will continue to be increased by CPI-U each year to establish the adjusted Maximum Assessment.

The Maximum Assessment is adjusted annually and is calculated independently of the District’s annual budget and proposed annual assessment. Any proposed annual assessment (rate per equivalent benefit unit) less than or equal to this Maximum Assessment is not considered an increased assessment, even if the proposed assessment is greater than the assessment applied in the prior fiscal year. The City Council may reduce or freeze the Maximum Assessment at any time by amending the Engineer’s Annual Report.

The Maximum Assessment adjustment is designed to establish a reasonable limit on District assessments. The Maximum Assessment calculated each year does not require or facilitate an increase to the annual assessment and neither does it restrict assessments to the adjustment maximum amount. If the budget and assessments for the fiscal year does not require an increase, or the increase is less than the adjusted Maximum Assessment, then the required budget and assessment may be applied without additional property owner balloting. If the budget and assessments calculated requires an increase greater than the adjusted Maximum Assessment then the assessment is considered an increased assessment.

To impose an increased assessment, the City Council must comply with the provisions of Article XIIID Section 4(c) of the California Constitution, which requires a public hearing and certain protest procedures including mailed notice of the public hearing and property owner protest balloting. Property owners through the balloting process must approve the proposed assessment increase. If the proposed assessment is approved, then a new Maximum Assessment is established for the District. If the proposed assessment is not approved, the City Council may not levy an assessment greater than the adjusted Maximum Assessment previously established for the District.

City of Vallejo
Hiddenbrooke Maintenance District
Engineer’s Report, FY 2024-2025

Page 29 ends

Estimated Benefit Units for Fiscal Year 2024-25
The following table summarizes the Equivalent Benefit Units for the various Land Use designations within HMD for Fiscal Year 2024-25.

EBUs per LAND USE DESIGNATION
Land Use Category
Land Use
Designation
Number of
Parcels
Dwelling Units
(Current &
Proposed)
Building
Sq Ft EBU Factor Total EBU
Single Family Residential SFR 1,113 1,113 N/A 1.00 1,113.00 Undeveloped Single Family
Residential SFV 108 108 N/A 0.60 64.80
Multi Family Residential MFR 0.00 0.00 N/A 0.90 0.00
Undeveloped Multi Family
Residential MFV 0.00 0.00 N/A 0.60 0.00
Commercial Property COM 0.00 0.00 0.00

1.00 EBU per 3,000
building sq ft 0.00
Undeveloped Commercial
Property CMV 0.00 0.00 0.00 0.50 EBU per acre 0.00
Developed Hotel Property HOT 0.00 0.00 N/A

0.15 EBU per
developed room and

0.12 EBU per
undeveloped room 0.00
Special Designation Property SPC 1 1 11,000

0.60 EBU per
proposed lot plus 0.60
EBU per 3,000
building sq ft 2.20
Duration of Assessment
It is proposed that the Assessment be levied for fiscal year 1992-93 and continued every year thereafter, so long as the Improvements need to be improved and maintained and the City of Vallejo requires funding from the Assessments for its Improvements in the HMD. As noted previously, the Assessment can continue to be levied annually after the City of Vallejo City Council approves an annually updated Engineer’s Report, budget for the Assessment, Improvements to be provided, and other specifics of the Assessment. In addition, the City Council must hold an annual public hearing to continue the Assessment.

City of Vallejo
Hiddenbrooke Maintenance District
Engineer’s Report, FY 2024-2025

Page 30 ends

Appeals and Interpretation
Any property owner who feels that the assessment levied on the subject property is in error as a result of incorrect information being used to apply the foregoing method of assessment, may file a written appeal with the Director of Public Works or her or his designee. Any such appeal is limited to correction of an assessment during the then current or, if before July 1, the upcoming fiscal year. Upon the filing of any such appeal, the Director of Public Works or his or her designee will promptly review the appeal and any information provided by the property owner. If the Director of Public Works or her or his designee finds that the assessment should be modified, the appropriate changes shall be made to the assessment roll. If any such changes are approved after the assessment roll has been filed with the County for collection, the Director of Public Works or his or her designee is authorized to refund to the property owner the amount of any approved reduction. Any property owner who disagrees with the decision of the Director of Public Works or her or his designee, may refer their appeal to the City Council of the City of Vallejo and the decision of the City Council of the City of Vallejo shall be final.

City of Vallejo
Hiddenbrooke Maintenance District
Engineer’s Report, FY 2024-2025

Page 31 ends

Assessment
WHEREAS, the City of Vallejo City Council directed the undersigned Engineer of Work to prepare and file a report presenting an estimate of costs, a diagram for the District and an assessment of the estimated costs of the improvements upon all assessable parcels within the District, to which Resolution and the description of the Improvements therein contained, reference is hereby made for further particulars; NOW, THEREFORE, the undersigned, by virtue of the power vested in me under the Act and the order of the City Council of said City of Vallejo, hereby make the following assessment to cover the portion of the estimated cost of the improvements, and the costs and expenses incidental thereto to be paid by the District.

As required by the Act, an Assessment Diagram is hereto attached and made a part hereof showing the exterior boundaries of said District. The distinctive number of each parcel or lot of land in the District is its Assessor Parcel Number appearing on the Assessment Roll.

I do hereby assess and apportion the net amount of the cost and expenses of the improvements, including the costs and expenses incident thereto, upon the parcels and lots of land within the District, in accordance with the special benefits to be received by each parcel or lot, from the improvements, and more particularly set forth in the Cost Estimate and Method of Assessment hereto attached and by reference made a part hereof.

The assessment is subject to an annual adjustment tied to the Consumer Price Index-U for the San Francisco Bay Area as of February 1 of each succeeding year (the “CPI”). The maximum authorized assessment rate is equal to the maximum assessment rate approved by property owners fiscal year 2003-2004 adjusted annually by the change in the CPI.

The change in the CPI from February 2023 to February 2024 was 2.37%. Therefore, the maximum authorized assessment rate for fiscal year 2024-2025 is increased by 2.37% which equates to $932.31 per equivalent benefit unit. The estimate of cost and budget in the Engineer’s Report proposes assessments for fiscal year 2025-2025 at the rate of $611.04, which is less than the maximum authorized assessment rate.

The assessment is made upon the parcels or lots of land within the District in proportion to the special benefits to be received by the parcels or lots of land, from the improvements.

City of Vallejo
Hiddenbrooke Maintenance District
Engineer’s Report, FY 2024-2025

Page 32 ends

Each parcel or lot of land is described in the Assessment Roll by reference to its parcel number as shown on the Assessor's Maps of the County of Solano for the fiscal year 2024- 2025. For a more particular description of the property, reference is hereby made to the deeds and maps on file and of record in the office of the County Recorder of the County.

I hereby place opposite the Assessor Parcel Number for each parcel or lot within the Assessment Roll, the amount of the assessment for the fiscal year 2024-2025 for each parcel or lot of land within the District.

Dated: April 15, 2024
Engineer of Work
By
John W. Bliss, License No. C052091
City of Vallejo
Hiddenbrooke Maintenance District
Engineer’s Report, FY 2024-2025

Page 33 ends

Appendix A - 2024-2025 Assessment Roll
An Assessment Roll (a listing of all parcels assessed within the District and the amount of the assessment) will be filed with the City Clerk and is, by reference, made part of this report and is available for public inspection during normal office hours.

Each lot or parcel listed on the Assessment Roll is shown and illustrated on the latest County Assessor records and these records are, by reference made part of this report.

These records shall govern for all details concerning the description of the lots or parcels.

City of Vallejo
Hiddenbrooke Maintenance District
Engineer’s Report, FY 2024-2025

Page 34 ends

Appendix B - Assessment Diagram
The original Assessment Diagram and Annexation map of the Orchards development is on file with the City Clerk and, by reference, made part of this Report. The Assessment Diagrams are available for inspection at the Office of the City Clerk, during normal business hours. Reference is hereby made to such Diagrams, and they are incorporated herein by reference.

CONSENT CALENDAR 8.J.

DATE: May 28, 2024
TO: Mayor and Members of the City Council
FROM: Beth Schoenberger, Water Director
SUBJECT: ADOPT A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF VALLEJO TO

APPROVE A COOPERATIVE PURCHASE AGREEMENT WITH EMBANKSCAPE

EQUIPMENT, LLC TO PROVIDE REMOTE-OPERATED SLOPE MOWERS FROM RC MOWERS IN AN AMOUNT NOT-TO-EXCEED $300,000 THROUGH JUNE 30, 2025 AND AUTHORIZING THE CITY MANAGER TO EXECUTE THE SAME.

RECOMMENDATION
Adopt a resolution of the City Council of the City of Vallejo to approve a Cooperative Purchase Agreement with EmbankScape Equipment, LLC to provide Remote-Operated Slope Mowers from RC Mowers in an amount not-to-exceed $300,000 through June 30, 2025 and authorizing the City Manager to execute the same.

REASONS FOR RECOMMENDATION
The Water Department - Facilities Division needs to purchase Tracked 52” Rotary Remote-Operated Slope Mowers to assist in maintaining the landscape of City of Vallejo assets. Due to recent legislation, outside state and local agencies are no longer able to assist in maintaining the landscape. Owning and operating the remote-controlled mowers will enable City staff to clear the fields and not need to rely on other agencies.

Owens Equipment Sales sells the remote-operated mowers from RC Mowers and is a local company. Owens will assist in any maintenance or repair service to the mowers for quick turn-around assistance.

BACKGROUND AND DISCUSSION
The City of Vallejo Water Department water treatment plants, reservoirs, pump stations, dams, lake systems, and rural land require year-round maintenance and specialty equipment to mitigate potential wildfire hazard/ fuel reduction. The City has an estimated 5,000+ acres to maintain. In prior years, the City Water Department has collaborated with local Fire Safe Councils and Cal-Fire to maintain these areas. However, due to recent changes in the State legislature, the availability of Cal-Fire hand crews has greatly decreased. This decrease in support has now increased the workload for Water Department Facilities/Maintenance personnel. The remote-operated mowers from RC Mowers are an essential piece of equipment to maintain the City’s landscape. The mowers have mechanical capabilities to efficiently cut 2” diameter brush on slopes as steep as 50 degrees (120% grade), and most importantly, it will keep City staff off uneven terrain and steep slopes that helps reduce slip/trip/fall injuries. Using a remote-operated mower will also increase City staff safety by keeping City staff away from other potential dangers found in nature and on City-owned assets such as poison oak/sumac, cow parsnip, rattlesnakes, ticks, etc.

RC Mowers is a USA-built brand that is sold through local dealers around the country. For the State of California, RC Mower parts and equipment are exclusively sold by Owen Equipment Sales. When the remoteoperated mowers need routine maintenance or warranty service, City personnel will transport the mowers to the nearest service center.

The City of Vallejo is currently a member of the Houston-Galveston Area Council (H-GAC). The H-GAC facilitates a Cooperative Purchase Agreement with Embankscape Equipment, LLC, which is the legal entity name for RC Mowers. As members of the H-GAC, the City is provided with discounts on mowers and mower- Date: May 28, 2024
Subject: ADOPT A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF VALLEJO TO

APPROVE A COOPERATIVE PURCHASE AGREEMENT WITH EMBANKSCAPE

EQUIPMENT, LLC TO PROVIDE REMOTE-OPERATED SLOPE MOWERS FROM RC MOWERS IN AN AMOUNT NOT-TO-EXCEED $300,000 THROUGH JUNE 30, 2025 AND AUTHORIZING THE CITY MANAGER TO EXECUTE THE SAME.

Page 2 ends

related products.

FISCAL IMPACT
This Agreement is for a not-to-exceed amount of $300,000 through June 30, 2025. There is sufficient funds in the current FY23-24 Water Enterprise budget to cover this expense. There is no fiscal impact to the General Fund related to this purchase.

ENVIRONMENTAL REVIEW
This action is exempt from the California Environmental Quality Act (CEQA) because it is not a project which has a potential for resulting in either a direct physical change in the environment, or a reasonably foreseeable indirect physical change in the environment, pursuant to CEQA Guideline section 15378.

ATTACHMENTS

1. EmbankScape - Resolution for Cooperative Purchase Agreement -- JC CAO Stamp

2. EmbankScape - COOP Bridge Agreement CAO Stamp

3. EmbankScape - Exhibit A -- Equipment

4. EmbankScape - Exhibit B -- Compensation - JM Edits

5. EmbankScape - Exhibit C -- HGAC Contract

6. EmbankScape - Exhibit D -- HGAC Agreement

7. EmbankScape - Exhibit E -- Insurance Requirements

CONTACT
Beth Schoenberger, Water Director, 707-648-5439
[email protected]
Approved as to form:

By: for
Veronica Nebb, City Attorney
RESOLUTION NO. 23-________

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF VALLEJO TO APPROVE A

COOPERATIVE PURCHASE AGREEMENT WITH EMBANKSCAPE EQUIPMENT, LLC TO

PROVIDE REMOTE-OPERATED SLOPE MOWERS FROM RC MOWERS AND

AUTHORIZING THE CITY MANAGER TO EXECUTE THE SAME
WHEREAS, the City of Vallejo Water Department oversees multiple water treatment facilities, locations and rural land, and watersheds with brush overgrowth; and WHEREAS, these identified locations require maintenance and upkeep to protect from events that can lead to brush fire or property damage; and
WHEREAS, the existing landscape requires personnel to remove debris and brush that was previously maintained by outside state and local agencies, but legislation has made those resources otherwise limited and or unavailable; and
WHEREAS, City staff sought out alternatives and have found RC mowers to be the best and safest alternative; and
WHEREAS, Owen Equipment Sales is the only authorized company in the State of California that supplies the remote-operated slope mowers manufactured by RC Mowers, legal entity name Embankscape Equipment, LLC; and
WHEREAS, a cooperative purchase agreement between the City of Vallejo Water Department and EmbankScape Equipment, LLC is needed to enable the Water Department to purchase the remote-operated slope mowers as members of the Houston-Galveston Area Council (H-GAC) cooperative purchase agreement; and
WHEREAS, Vallejo Municipal Code section 3.20.090(7) exempts cooperative purchasing contracts from competitive bidding.

NOW THEREFORE, BE IT RESOLVED that the City Council hereby approves the Cooperative Purchase Agreement with EmbankScape Equipment, LLC and authorizes the City Manager of the Vallejo City Council to execute a Cooperative Purchase Agreement with EmbankScape Equipment, LLC for remote-operated mowers for a not-to-exceed amount of $300,000.00 and a contract end date of June 30, 2025, with options to extend into October 31, 2027.

ADOPTED BY THE CITY COUNCIL OF THE CITY OF VALLEJO at a regular meeting held on May 14, 2024, with the following vote:

AYES:

NOES:

ABSENT:

ABSTAIN:
_________________________________________
ROBERT H. MCCONNELL, MAYOR
ATTEST: _________________________________________
DAWN G. ABRAHAMSON, CITY CLERK
Approved as to form:

By: for
Veronica Nebb, City Attorney

CITY OF VALLEJO

CO-OP PURCHASE AGREEMENT
This Co-Op Purchase Agreement ("Agreement") is made at Vallejo, California, dated for reference this 29th day of May 2024, by and between the City of Vallejo, a municipal corporation ("City"), and EmbankScape Equipment, LLC, a Wisconsin limited liability corporation, hereinafter referred to as “Vendor,“ who agree as follows:

1. Products. Subject to the terms and conditions set forth in this Agreement, Vendor shall provide the City Grounds & Turf Equipment as specified in Exhibit A, entitled “Equipment.”

2. Payment. City shall pay Vendor for said products at the times and in the manner set forth in Exhibit B, entitled “Compensation.” The payments specified in Exhibit B shall be the only payments to be made to Vendor for the products sold to the City pursuant to this Agreement.

3. CO-OP Purchasing Program. Vendor has an agreement with the HoustonGalveston Area Council of Governments, a local government unit of the State of Texas (“H-GAC”), to provide equipment, products, or services. City is a member of H-GACBuy, which is the cooperative purchasing program allowing member entities to access HGAC’s cooperative purchasing contracts such as Vendor’s contract with H-GAC.

Vendor’s contract with H-GAC is attached hereto as Exhibit C, entitled “H-GAC Contract” and incorporated herein by this reference.

City has an agreement with H-GAC and, as a “Member,” has access to H-GAC’s cooperative purchasing contracts in accordance with the terms and conditions of the HGAC Contract. Said Agreement is attached hereto as Exhibit D, entitled “H-GAC Agreement,” and incorporated herein by this reference.

4. Facilities and Parts. Vendor shall, at its sole cost and expense, furnish all facilities and parts which may be required for furnishing the products and services pursuant to this Agreement.

5. Indemnification. Vendor shall indemnify, hold harmless, and defend City, its officers, officials, directors, employees, agents, volunteers and affiliates and each of them from any and all claims, demands, causes of action, damages, costs, expenses, actual attorney’s fees, Vendor’s fees, expert fees, losses or liability, in law or in equity, of every kind and nature whatsoever arising out of or in connection with Vendor’s activities, or any subcontractor’s activities, to be performed under this agreement for Vendor’s tort negligence including active or passive, or strict negligence, including but Approved as to form:

By: for
Veronica Nebb, City Attorney
not limited to personal injury including, but not limited to bodily injury, emotional injury, sickness or disease, or death to persons and/or damage to property of anyone, including loss of use thereof, caused or alleged to be caused by any act or omission of Vendor, or any subcontractor, or anyone directly or indirectly employed by any of them or anyone for the full period of time allowed by the law, regardless to any limitation by insurance, with the exception of the sole negligence or willful misconduct of the City.

The provisions of this section shall survive the expiration or termination of this Agreement.

6. Insurance Requirements. Vendor agrees to comply with all of the Insurance Requirements set forth in Exhibit E, entitled “Insurance Requirements.” Failure to maintain required insurance at all times shall constitute a default and material breach.

7. Accident Reports. Vendor shall immediately report (as soon as feasible, but not more than 24 hours) to the City Risk Manager any accident or other occurrence causing injury to persons or property during the performance of this Agreement. The report shall be made in writing and shall include, at a minimum: (a) the names, addresses, and telephone numbers of the persons involved, (b) the names, addresses, and telephone numbers of any known witnesses, (c) the date, time, and description of the accident or other occurrence.

8. Conflict of Interest. Vendor warrants and represents that to the best of its knowledge, there exists no actual or potential conflict between Vendor’s family, business, real property or financial interests and the materials to be provided under this Agreement.

Vendor shall comply with the City of Vallejo Conflict of Interest Code and not enter into any contract or agreement during the performance of this Agreement which will create a conflict of interest with its duties to City under this Agreement. In the event of a change in Vendor’s family, business, real property, or financial interests occurs during the term of this Agreement that creates an actual or potential conflict of interest, then Vendor shall disclose such conflict in writing to City.

9. Licenses, Permits, Etc. Vendor represents and warrants to City that all Vendor equipment and supplies shall be provided by a person or persons duly licensed by the State of California to provide the type of equipment and supplies to be provided under this Agreement.

10. Force Majeure. Neither party shall be considered in default of this Agreement to the extent performances are prevented or delayed by causes or circumstances beyond either party’s reasonable control, such as war, riots, strikes, lockouts, work slowdown or Approved as to form:

By: for
Veronica Nebb, City Attorney
stoppage, acts of God, such as floods or earthquakes, and electrical blackouts or brownouts.

In the event that the Vendor is unable to meet the completion date or schedule of materials, Vendor shall immediately inform the City Representative of this in writing. If additional time is required to perform the work, the City Representative may adjust the schedule.

11. Time is of the Essence. Time is of the essence in this Agreement. Any reference to days means calendar days, unless otherwise specifically stated.

12. Term. The term of this Agreement shall be effective May 29, 2024, and shall continue in full force and effect until June 30, 2025.

If the term of this Agreement extends into fiscal years subsequent to that in which it is approved, such continuation of the Agreement is contingent on the appropriation of funds for such purpose by the City Council of the City of Vallejo. If funds to effect such continued payment are not appropriated, Vendor agrees to terminate any materials supplied to City of Vallejo under this Agreement, and relieve City of any further obligation therefore.

13. Termination or Abandonment by City. The City has the right, at any time and in its sole discretion, to immediately terminate this Agreement by giving notice to Vendor.

Upon receipt of a notice of termination, Vendor shall provide no further equipment or supplies except as specified in the notice. The City shall pay Vendor for equipment and supplies received in accordance with this Agreement before the date of termination.

14. Assignment and Subcontracting. Vendor shall not subcontract, assign or transfer voluntarily or involuntarily any of its rights, duties or obligation under this Agreement without the express written consent of the City Manager or his or her designee in each instance. Any attempted or purported assignment of any right, duty or obligation under this Agreement without said consent shall be void and of no effect.

15. Successors and Assigns. All terms, conditions, and provisions of this Agreement shall apply to and bind the respective heirs, executors, administrators, successors, and assigns of the parties. Nothing in this section is intended to affect the limitation on assignment.

16. Non-Discrimination/Fair Employment Practices. Vendor shall not, because of race, religious creed, color, sex, national original, ancestry, disability, medical condition, age, marital status or sexual orientation of any person, refuse to hire or employ, or to bar or discharge from employment, or to discriminate in compensation, or in terms, conditions Approved as to form:

By: for
Veronica Nebb, City Attorney
or privileges any person, and every employee will receive equal opportunity for employment and shall be granted equal treatment with respect to compensation, terms, conditions or other privileges of employment, without regard to his race, religious creed, color, sex, national origin, ancestry, or disability, medical condition, age, marital status or sexual orientation.

Vendor warrants and represents it is an equal opportunity employer and agrees it shall not discriminate on the basis of race, religious creed, color, sex, national origin, ancestry, disability, medical condition, age, marital status or sexual orientation in the selection and retention of employees, subcontractors or procurement of materials or Supplies.

17. Notices. All notices or instruments required to be given or delivered by law or this Agreement shall be in writing and shall be effective upon receipt thereof and shall be by personal service or delivered by depositing the same in any United States Post Office, registered or certified mail, postage prepaid, addressed to:

If to City: Beth Schoenberger
Water Director
City of Vallejo, Water Department
202 Fleming Hill Road
Vallejo, CA 94589

If to Vendor: Cori Triest
Sales Operation Manager
EmbankScape Equipment, LLC
2158 Deerfield Avenue E
Suamico, WI 54173

Any party may change its address for receiving notices by giving written notice of such change to the other party in accordance with this section.

18. Integration Clause. This Agreement, including all Exhibits, contains the entire agreement between the parties and supersedes whatever oral or written understanding they may have had prior to the execution of this Agreement. This Agreement shall not be amended or modified except by a written agreement executed by each of the parties hereto.

Approved as to form:

By: for
Veronica Nebb, City Attorney

19. Severability Clause. Should any provision of this Agreement ever be deemed to be legally void or unenforceable, all remaining provisions shall survive and be enforceable.

20. Law Governing. This Agreement shall in all respects be governed by the law of the State of California without regard to its conflicts of law rules. Litigation arising out of or connected with this Agreement shall be instituted and maintained in the courts of Solano County in the State of California or in the United States District Court, Eastern District of California, Sacramento, California, and the parties consent to jurisdiction over their person and over the subject matter of any such litigation in such courts, and consent to service of process issued by such courts.

21. Waiver. Waiver by either party of any default, breach or condition precedent shall not be construed as a waiver of any other default, breach or condition precedent or any other right hereunder.

22. Ambiguity. The parties acknowledge that this is a negotiated agreement, that they have had the opportunity to have this Agreement reviewed by their respective legal counsel, and that the terms and conditions of this Agreement are not to be construed against any party on the basis of such party's draftsmanship thereof.

23. Gender. All pronouns and any variations thereof shall be deemed to refer to the masculine, feminine, neuter, singular or plural, as the identifications of the person or persons, firm or firms, corporation or corporations may require.

24. Headings. The section headings contained in this Agreement are inserted for convenience only and shall not affect in any way the meaning or interpretation of this Agreement.

25. Compliance with Laws. Vendor will comply with all statutes, regulations and ordinances in the performance of all materials under this Agreement.

26. Counterparts. The parties may execute this Agreement in one or more counterparts, each of which shall be deemed an original, but all of which together shall be deemed one and the same instrument.

27. Facsimile Signature; Electronic Signature. This Agreement shall be binding upon the receipt of facsimile signatures or e-mailed by PDF or otherwise. Any person transmitting his or her signature by facsimile or electronically shall promptly send an original signature to the other party pursuant to the notice provision of this Agreement.

The failure to send an original shall not affect the binding nature of this Agreement.

Approved as to form:

By: for
Veronica Nebb, City Attorney

28. Authority. The person signing this Agreement for Vendor hereby represents and warrants that he/she is fully authorized to sign this Agreement on behalf of Vendor.

29. Exhibits. The following exhibits are attached hereto and incorporated herein by reference:

Exhibit A, entitled “Equipment,” including any attachments Exhibit B, entitled “Compensation,” including any attachments Exhibit C, entitled “H-GAC Contract,” between Vendor and H-GAC Exhibit D, entitled “H-GAC Agreement,” between City and H-GAC Exhibit E, entitled “Insurance Requirements,” including attachments [SIGNATURES ON FOLLOWING PAGE]
Approved as to form:

By: for
Veronica Nebb, City Attorney
IN WITNESS WHEREOF, the parties have executed this Agreement on the day and year shown below the name of each of the parties.

EmbankScape Equipment, LLC,
a Wisconsin limited liability corporation
By: ____________________________
Russell Knight
CA Regional Manager

CITY OF VALLEJO,
a municipal corporation
By: ___________________________
Michael Malone
City Manager

Dated:
(City Seal)
Dated:

ATTEST:

By:_______________________
Dawn G. Abrahamson
City Clerk
Approved as to form:

By: For
Veronica A. F. Nebb
City Attorney

EQUIPMENT

1. Representatives. The City Representative for this Agreement is:

Terry Duncan
Facilities Maintenance Superintendent
Water Department
202 Fleming Hill Road
Vallejo, CA 94589
(707) 567-7210
[email protected]
The Vendor’s Representative for this Agreement is:

Bryan Johnson
Regional Sales Manager
EmbankScape Equipment, LLC
2158 E Deerfield Ave
Suamico, WI 54173
(971) 285-7318
[email protected]
All routine administrative communications between the parties will be between the above named representatives and may be by personal delivery, mail, facsimile transmission, or electronic mail as agreed between the Vendor Representative and City’s Representative.

2. Equipment to be Provided. The equipment provided shall be the Grounds and Turf Equipment found on the RC Mowers Price List that includes but is not limited to products such as:
• Remote-Operated Robotic Mowers and Options
• Maintenance Parts
• Maintenance Kits
• Replacement Belt Kits

EXHIBIT B

COMPENSATION

EXHIBIT B
Compensation

1. Vendor’s Compensation. City agrees to pay Vendor, at the rate(s) specified below, for those products set forth in Exhibit A of this Agreement, for a total not-to-exceed amount of Three Hundred Thousand Dollars and Zero Cents ($300,000.00).

All prices shall be F.O.B destination: 202 Fleming Hill Road, Vallejo, CA 94589.

2. Invoicing. In order to expedite payment, all submitted invoices must be itemized as to quantity, unit price, part number, description, grand total, and applicable discount (if any). In addition, invoices must show the name of the department, address to which the parts were delivered, and the City of Vallejo Purchase Order Number. Invoices may be submitted by personal delivery, mail, or electronic mail. Invoices may be sent to:

Personal Delivery or Mail:

Vallejo Water Department
Accounts Payable
202 Fleming Hill Rd.

Vallejo, CA 94589
Electronic Mail:
[email protected]

3. Packing Slips. Delivery tickets and packing slips will contain the same information as invoices. All packing slips and/or delivery tickets must include the receiving employee’s signature and printed name.

4. Payment. Payment is due thirty (30) days after the City has approved the invoice or after the City has accepted the goods, whichever occurs later.

Request for payment shall be sent to:

Vallejo Water Department
Accounts Payable
202 Fleming Hill Rd.

Vallejo, CA 94589
[email protected]

5. Accounting Records of Vendor. Vendor shall maintain for three (3) years after completion of all materials hereunder, all records under this Agreement, including, but not limited to, records of Vendor’s direct costs for all Parts and Additional Parts delivered under this Agreement in accordance with generally accepted accounting practices. Vendor shall keep such records available for audit, inspection, and copying by representatives of the City’s Finance Department or other government agencies during regular business hours upon twentyfour (24) hours’ notice.

The obligations of Vendor under this section shall survive this Agreement.

6. Taxes. Vendor shall pay, when and as due, any and all taxes incurred as a result of Vendor’s compensation hereunder, including estimated taxes, and shall provide City with proof of such payments upon request.

7. Taxpayer Identification Number. Vendor shall provide City with Vendor’s complete Request for Taxpayer Identification Number and Certification, Form W-9, as issued by the Internal Revenue Service, and any other State or local tax identification number requested by City.

PART NUMBER DESCRIPTION LIST PRICE HGAC

DISCOUNT
226013 TK-44E - Tracked 44" Rotary Mower, 21.5hp Kawasaki Engine, 45° Max Slope $ 47,438 $ 37,950 226021 TK-52XP - Tracked 52" Rotary Mower, 27hp Kawasaki Engine, 50° Max Slope $ 72,438 $ 57,950 226022 TK-60XP - Tracked 60" Rotary Mower, 38.5hp Kawasaki EFI Engine, 50° Max Slope $ 78,688 $ 62,950 700010 Light Kit, XP Models $ 611 $ 488.51
700010-01 Light Kit Installation (Includes wiring and mounting) $ 234 $ 187.50 700009 4500 LB Winch Kit - Synthetic Rope, Receiver Mounted, Storage Bracket, 1 Year Warranty $ 1,190 $ 952.00 700009-01 4500 LB Winch Installation $ 163 $ 130.00
310138-01 Front Jack, allows for easy access to the deck and blade changes $ 138 $ 110.16 790118 Fire Extinguisher w/Quick Release Bracket $ 111 $ 88.41 790118-01 Fire Extinguisher Installation $ 47 $ 37.50
790101 200 Hour Maintenance Kit - [ TK-52XP ] $ 366 $ 292.85 790102 200 Hour Maintenance Kit - [ TK-60XP ] $ 327 $ 261.75 790104 200 Hour Maintenance Kit - [ TK-44E ] $ 307 $ 245.54 790105 Replacement Belt Kit (All Belts) - [ TK-52XP ] $ 205 $ 164.37 790106 Replacement Belt Kit (All Belts) - [ TK-60XP ] $ 209 $ 167.57 790107 Replacement Belt Kit (All Belts) - [ TK-44E ] $ 192 $ 153.27 790121 Reaper Swing Blade Kit (3 Blade Assemblies) - [ TK-44E ] $ 302 $ 241.53 790116 Reaper Swing Blade Kit (3 Blade Assemblies) - [ TK-52XP ] $ 322 $ 257.58 790115 Reaper Swing Blade Kit (3 Blade Assemblies)- [ TK-60XP ] $ 341 $ 272.73 790117 Reaper Blade Replacement Kit - 6 Blades & Hardware [All TK Models] $ 241 $ 192.66 790124 44" Mulching Fixed Blade Kit - 3 Blades $ 90 $ 71.85 790122 52" Mulching Fixed Blade Kit - 3 Blades $ 90 $ 71.85 790123 60" Mulching Fixed Blade Kit - 3 Blades $ 90 $ 71.85 850120 52" Standard Fixed Blade (each) $ 27 $ 21.55
850160 60" Standard Fixed Blade (each) $ 30 $ 23.95
Notes:

OPTIONS

REMOTE-OPERATED ROBOTIC MOWERS
[ 2022 PRICE LIST ]
2146 Deerfield Ave E | Suamico, WI | 920.634.2227 | RCMOWERSUSA.COM

MAINTENANCE PARTS
Notes:
- See Page 2 for Stock Part Kit inclusions.

BLADES
Effective 11.15.2021 Page 1 of 2

PART NUMBER DESCRIPTION QTY SUGGESTED
RETAIL
850260 Filter, Oil, Engine, Kawasaki (XP Models) 2
850240 Air filter, outer, Donaldson 1
850442 Oil, Engine, 10W-30, FIVE (5) Quarts 1
850700 Spark Plug, (44E, 48P, 52XP) 4
850460 Filter, Fuel, Kawasaki (XP, E) 2
850441 Oil, Engine, 10W-30 SAE, ONE (1) Quart 3
850445 Oil, Transmission, 15W-50, ONE (1) Quart 10
850210 Filter, Oil, Transmission, 5400 Hydrogear, (XP Models) 2 850260 Filter, Oil, Engine, Kawasaki (XP Models) 2
850240 Air filter, outer, Donaldson 1
850360 Spark Plug Kawi, (TK-60XP Model FX1000V) 4
850460 Filter, Fuel, Kawasaki (XP, E) 2
850441 Oil, Engine, 10W-30 SAE, ONE (1) Quart 1
850442 Oil, Engine, 10W-30 SAE, FIVE (5) Quarts 1
850445 Oil, Transmission, 15W-50, ONE (1) Quart 10
850210 Filter, Oil, Transmission, 5400 Hydrogear, (XP Models) 2 850470 Filter, Oil, Engine, Kawasaki (E Models) 2
850480 Air filter w/pre-filter, Kawasaki brand OEM, E Model 1 850700 Spark Plug, (44E, 48P, 52XP) 4
850460 Filter, Fuel, Kawasaki (XP, E) 2
850450 Filter, Oil, Transmission, 3100 hydro, (E Model) 2 850442 Oil, Engine, 10W-30, FIVE (5) Quarts 1
850441 Oil, Engine, 10W-30 SAE, ONE (1) Quart 2
850445 Oil, Transmission, 15W-50 SAE, ONE (1) Quart 4
850100 PTO Belt (TK-52XP) 1
850110 Mower Drive Belt (TK-52XP) 1
850180 Transaxle Drive Belt (XP) 1
850140 PTO Belt (Engine to Deck) (TK-60XP) 1
850150 Mower Drive Belt (TK-60XP) 1
850180 Transaxle Drive Belt (XP) 1
850400 Transaxle Drive Belt (E) 1
850410 Mower Belt (Left) (TK-44E) 1
850420 Mower Belt (Right) (TK-44E) 1
$292.85
All items required for the first 200 hours of maintenance - TK-52XP 790102 | 200 Hour Maintenance Kit [ TK-60XP ]
[ PARTS & MAINTENANCE KITS ]
2146 Deerfield Ave E | Suamico, WI | 920.634.2227 | RCMOWERSUSA.COM 790101 | 200 Hour Maintenance Kit [ TK-52XP ]
$261.75
All items required for the first 200 hours of maintenance - TK-60XP 790104 | 200 Hour Maintenance Kit [ TK-44E ]
$245.54
All items required for the first 200 hours of maintenance - TK-44E 790105 | Replacement Belt Kit (All Belts) [ TK-52XP ]
$164.37
790106 | Replacement Belt Kit (All Belts) [ TK-60XP ]
$167.57
790107 | Replacement Belt Kit (All Belts) [ TK-44E ]
$153.27
Effective 11.15.2021 Page 2 of 2
RC Mowers
2146 Deerfield
Ave E
Suamico, WI
54173
Hydro
Max Slope Current HGAC Price 2021 List Price New H-GAC Catalog Price (Discount 20%) % Change 20% off List
ZT 5400 35 $33,950 Discontinued, Removed from Catalog
ZT 5400 35 $35,950 Discontinued, Removed from Catalog
ZT 3100 45 $39,950 $ 37,950 47,438 $ -5.01%ZT 3400 45 $47,950 Discontinued, Removed from Catalog ZT 5400 50 $53,950 $ 57,950 72,438 $ 7.41%ZT 5400 50 $57,950 $ 62,950 78,688 $ 8.63% Quantity/Multi-unit discount: Purchaser will be awarded an additional 2.5% discount when ordering four or more units (all units are applicable so long as a group of four are purchased) November 2021 PRICE CHANGES
20% off List
60XP 29hp Yamaha $42,438
(FORM D) - FULL PRODUCT LISTING Proposed Price List PRODUCT CODE: GR20AAF1 Model # Engine 2020 List Price
Wheeled Drive systems
72XP 33hp Yamaha $44,938
Tracked Drive Systems
TK-44E 21.5hp Kawasaki $49,938
TK-60XP 35hp Kawasaki $72,438
TK-48P 22hp Kawasaki $59,938
TK-52XP 27hp Kawasaki $67,438
New Description
700001 700010 Light Kit, XP Models $460.00 $368.00 $611.00 $488.80 33%700002 - $458.00 $366.40 Discontinued, Removed from Catalog700004 Light Kit Installation (Includes Wiring & Mounting) $344.00 $275.20 $234.38 $187.50 N/A700003 - $1,914.00 $1,531.20 Discontinued, Removed from Catalog CS310135-60 - $330.00 $264.00 Discontinued, Removed from CatalogCS310135-52 - $343.00 $274.40 Discontinued, Removed from CatalogCS310135-48 - $361.00 $288.80 Discontinued, Removed from Catalog KIT - 200hr TK-48P Maint 200 Hour Maintenance Kit - [TK-52XP] $339.00 $271.20 $366.06 $292.85 8%KIT - 200hr TK-52XP Maint 200 Hour Maintenance Kit - [TK-60XP] $368.00 $294.40 $327.19 $261.75 -11%KIT - 200hr TK-60XP Maint 200 Hour Maintenance Kit - [TK-44E] $344.00 $275.20 $306.93 $245.54 -11%310138-01 310138-01 Front Jack, allows for easy access to the deck and blade changes $100.00 $80.00 $137.70 $110.16 N/A 800600 790118 Fire Extinguisher w/Quick Release Bracket $159.00 $127.20 $110.51 $88.41 -30% - 790118-01 Fire Extinguisher Installation - - 46.88 37.50 $ N/A - 700009 4500 LB Winch Kit - Synthetic Rope, Receiver Mounted, Storage Bracket, 1 Year Warranty - - 1190 952.00 $ N/A- 700009-01 4500 LB Winch Installation (Includes Wiring & Mounting) - - 162.5 130.00 $ N/A- 790105 Replacement BeLt Kit (All Belts) - [TK-52XP] - - 205.46 164.37 N/A- 790106 Replacement Belt Kit (All Belts) - [TK-60XP] - - 209.46 167.57 N/A- 790107 Replacement Belt Kit (All Belts) - [TK-44E] - - 191.59 153.27 N/A- 790121 Reaper Swing Blade Kit (3 Blade Assemblies) - [ TK-44E ] - - 301.91 241.53 N/A- 790116 Reaper Swing Blade Kit (3 Blade Assemblies) - [ TK-52XP ] - - 321.98 257.58 N/A- 790115 Reaper Swing Blade Kit (3 Blade Assemblies)- [ TK-60XP ] - - 340.91 272.73 N/A- 790117 Reaper Blade Replacement Kit - 6 Blades & Hardware [All TK Models] - - 240.82 192.66 N/A- 790124 44" Mulching Fixed Blade Kit - 3 Blades - - 89.81 71.85 N/A- 790122 52" Mulching Fixed Blade Kit - 3 Blades - - 89.81 71.85 N/A- 790123 60" Mulching Fixed Blade Kit - 3 Blades - - 89.81 71.85 N/A- 850120 52" Standard Fixed Blade (each) - - 26.94 21.55 N/A- 850160 60" Standard Fixed Blade (each) - - 29.94 23.95 N/A ne-specific oils, filters & spark plugs rene-specific oils, filters & spark plugs rene-specific oils, filters & spark plugs re Front Jack, allows for easy access to
--

NEW OPTIONS & PARTS
November 2021 PRICE CHANGES
Current Description
Current Part
Number New Part Number % Change
New H-GAC
Catalog Price
(Discount
20%)
2021 List
Price
Current H-GAC
Catalog Discount
20%
2020 List
Form E
Published Options
LED Driving Light Kit
Swing Blades 60” (full set)
Swing Blades 52” ( full set)
Swing Blades 48” (full set)
Light Kit, P Models
Light Kit Installation
3,500 lb Winch
----
Fire Extinguisher w/Quick Release
---------
H-GAC
Houston-Galveston Area Council
P.O. Box 22777 · 3555 Timmons · Houston, Texas 77227-2777 Cooperative Agreement - EmbankScape Equipment LLC - Public Services - -

Page 1 of 7 ends
← All documents from this meeting