Cities Index.
cc 2023 AR 10/24 kensho housing

Vista City Council
October 24, 2023

Document
cc 2023 AR 10/24 kensho housing
Meeting
October 24, 2023
Body
Vista City Council
Pages
491
Original file
4.9 MB
Text extracted from the city's file for reading and search. Open the original on portal.laserfiche.com. That file is the official record.

City of Vista
Guajome Street
B/ Lado de Loma Drive - Mercantile Street
24 Hour Directional Volume Counts

VSTGULLME
Site Code: 229-21679
Counts Unlimited, Inc
PO Box 1178
Corona, CA 92878
Phone: 951-268-6268
email: [email protected]
Start 11/10/2021 Eastbound Hour Totals Westbound Hour Totals Combined Totals Time Wed Morning Afternoon Morning Afternoon Morning Afternoon Morning Afternoon Morning Afternoon 12:00 1 41 237
12:15 2 41 225
12:30 0 29 133
12:45 0 44 3 155 125 6 120 9 275
01:00 0 36 035
01:15 2 28 037
01:30 0 50 135
01:45 1 44 3 158 039 1 146 4 304
02:00 2 56 132
02:15 0 60 122
02:30 0 46 038
02:45 1 66 3 228 0 51 2 143 5 371
03:00 1
66 0 54
03:15 1 46 1 44
03:30 0 58 0 51
03:45 1 47 3 217 047 1 196 4 413
04:00 1 46 039
04:15 1 51 235
04:30 3 44 246
04:45 1 54 6 195 95313 173 19 368
05:00 5 43 144
05:15 7 37 441
05:30 11 42 242
05:45 8 33 31 155 73114 158 45 313
06:00 15 37 625
06:15 19 36 823
06:30 21 28 11 39
06:45 20 23 75 124 18 21 43 108 118 232
07:00 33 30 33 23
07:15 28 19 23 18
07:30 40 13 35 16
07:45 32 28 133 90 37 11 128 68 261 158
08:00 43 15 42 18
08:15 39 19 29 9
08:30 38 12 20 12
08:45 38 12 158 58 25 4 116 43 274 101
09:00 27 15 26 10
09:15 27 2 29 6
09:30 35 12 22 11
09:45 37 5 126 34 32 2 109 29 235 63
10:00 41 2 22 10
10:15 38 4 39 3
10:30 31 3 32 2
10:45 42 2 152 11 22 3 115 18 267 29
11:00 37 2 21 0
11:15 43 5 29 4
11:30 38 2 22 3
11:45 31 1 149 10 25 0 97 7 246 17
Total 842 1435 842 1435 645 1209 645 1209 1487 2644
Combined
Total 2277 2277 1854 1854 4131
AM Peak - 10:45 - - - 07:30 - - - - -
Vol. - 160 - - - 143 - - - - -
P.H.F. 0.930 0.851
PM Peak - - 02:15 - - - 02:45 - - - -
Vol. - - 238 - - - 200 - - - -
P.H.F. 0.902 0.926
Percentag
e 37.0% 63.0% 34.8% 65.2%
ADT/AADT ADT 4,131 AADT 4,131
10/24/2023 PH1 386 of 2254

Day:City:Vista
Date:Project#:CA17_4294_117

NB SB EB WB
2,074 1,458 00
AMPeriod NB SB EB WB NB SB EB WB
00:00 3 1 4 32 23 55 
00:15 4 0 43223 55
00:30 1 1 23530 65
00:45 1902 111 3012935111 65240
01:00 1 1 23214 46
01:15 0 1 13733 70
01:30 0 1 13317 50
01:45 0125 26 361381781 53219
02:00 0 1 1 36 20 56 
02:15 0 2 2 38 27 65 
02:30 0 0 0 33 32 65 
02:45 0 0 3 0 3 51 158 35 114 86 272
03:00 1 0 1 56 41 97 
03:15 0 1 1 54 42 96 
03:30 1 2 3 47 30 77 
03:45 0203 05 4620331144 77347
04:00 1 1 2 47 31 78 
04:15 0 1 1 54 38 92 
04:30 1 2 3 54 34 88 
04:45 4637 713 5220739142 91349
05:00 4 2 6 44 45 89 
05:15 4 4 8 38 25 63 
05:30 11 2 13 45 32 77 
05:45 8 27 3 11 11 38 46 173 33 135 79 308
06:00 16 10 26 18 26 44 
06:15 13 8 21 30 31 61 
06:30 14 11 25 27 28 55 
06:45 12 55 10 39 22 94 26 101 14 99 40 200
07:00 30 17 47 21 25 46 
07:15 18 19 37 15 20 35 
07:30 42 27 69 20 18 38 
07:45 49 139 27 90 76 229 10 66 7 70 17 136
08:00 31 28 59 13 10 23 
08:15 43 20 63 13 13 26 
08:30 28 12 40 11 9 20 
08:45 37 139 21 81 58 220 14 51 9 41 23 92
09:00 28 12 40 15 11 26 
09:15 21 15 36 15 10 25 
09:30 30 15 45 19 7 26 
09:45 38 117 17 59 55 176 6 55 5 33 11 88
10:00 40 15 55 9 5 14 
10:15 30 19 49 4 13 17 
10:30 31 22 53 6 2 8 
10:45 21 122 16 72 37 194 3 22 1 21 4 43
11:00 38 15 53 5 0 5 
11:15 36 16 52 4 4 8 
11:30 39 24 63 4 1 5 
11:45 26 139 33 88 59 227 2 15 2 7 4 22
TOTALS 756 460 1216 1318 998 2316
SPLIT%62.2% 37.8%34.4%56.9% 43.1%65.6%

NB SB EB WB
2,074 1,458 00
AMPeakHour 07:30 11:45 07:30 14:45 16:15 16:15
AMPkVolume 165 109 267 208 156 360
PkHrFactor 0.842 0.826 0.878 0.929 0.867 0.978
7Ͳ9Volume 278 171 00449 380 277 00657
7Ͳ9PeakHour 07:30 07:30 07:30 16:00 16:15 16:15
7Ͳ9PkVolume 1651020026720715600360
PkHrFactor 0.842 0.911 0.000 0.000 0.878 0.958 0.867 0.000 0.000 0.978 4Ͳ6PeakHour
4Ͳ6PkVolume
SPLIT%
TOTAL
PkHrFactor
PMPeakHour
PMPkVolume
PkHrFactor
4Ͳ6Volume
20:45
TOTAL
23:45
TOTALS
Total
3,532

DAILY TOTALS
21:00
21:15
20:30
DAILYTOTALS
22:15
22:30
22:45
23:00
23:15
23:30
GuajomeStBet.SantaFeAve(S)&LadoDeLomaDr
21:30
21:45
22:00
Total
3,532
19:30
19:45
20:00
20:15
18:00
18:15
18:30
18:45
19:00
19:15
16:45
17:00
17:15
Thursday
17:30
17:45
15:15
15:30
15:45
16:00
16:15
16:30
14:00
14:15
14:30
12/14/2017
14:45
15:00
DAILYTOTALS
PMPeriod
VOLUME
PreparedbyNDS/ATD
13:15
13:30
13:45
12:00
12:15
12:30
12:45
13:00
10/24/2023 PH1 387 of 2254

Pheasant Hills Queuing Analysis Attachments
Technical Memorandum
Attachment D -Queuing Analysis Worksheets
10/24/2023 PH1 388 of 2254

$VISION
*File:P:\Shared\Project\2021.0488_PheasantHillMulƟ-Family\Analysis\Round2\VISSIM\PheasantHills.inpx *Comment:
*Date:12/15/20214:08:48PM
*PTVVissim:2021.00[11]
*
*Table:QueueResults
*
*SIMRUN:SimRun Simulationrun(Numberofsimulationrun) *TIMEINT:TimeInt Timeinterval(Timeinterval)
*QUEUECOUNTER:QueueCounter Queuecounter(QueueCounter) *QLEN:QLen Queuelength(A
*QLENMAX:QLenMax Queuelength(m
*QSTOPS:QStops
*
*SimRun;TimeInt;QueueCounter;QLen;QLenMax;QStops
*Simulationrun;Timeinterval;Queuecounter;Queuelength;Queuelength(maximum);Queuestops *
SIMRUN:SimRun TIMEINT QUEUECOUNTER QLEN QLENMAX QSTOPS 1 0-3600 1 0.34 46.71 4
2 0-3600 1 0.14 47.02 2
3 0-3600 1 0.21 47.39 1
4 0-3600 1 0 0 0
5 0-3600 1 0.01 21.15 1
6 0-3600 1 0.12 44.23 1
7 0-3600 1 0.12 44.6 2
8 0-3600 1 0 0 0
9 0-3600 1 0.17 44.61 1
10 0-3600 1 0.16 44.63 1
11 0-3600 1 0.05 44.67 1
12 0-3600 1 0.14 44.69 1
13 0-3600 1 0.04 45.72 1
14 0-3600 1 0.07 45.86 2
15 0-3600 1 0 0 0
16 0-3600 1 0.41 46.14 3
17 0-3600 1 0.04 46.42 1
18 0-3600 1 0.19 46.42 1
19 0-3600 1 0.18 45.86 2
20 0-3600 1 0.14 44.69 1
25 50
Queuestops(Numberofqueuestops.Aqueuestopiswhereonevehiclethatis directlyupstreamorwithinthequeuelengthfallsbelowthespeedoftheBegin attributedefinedforthequeuecondition.)
thecurrentqueuelengthismeasuredupstreambythequeue counterandthemaximumisthuscalculatedpertimeinterval.) [ft]
thecurrentqueuelengthismeasuredupstreambythequeue counterandthearithmeticmeanisthuscalculatedpertime interval.)[ft]
AVERAGE(Rounduptothenearest25ftorlengthof1standardvehicle) 10/24/2023 PH1 389 of 2254

City of Vista Attachment D – Biological Resources Letter Report Tideline Kensho Residential Project – IS/MND P-22-0282 August 2023

Attachment D – Biological Resources Letter Report

10/24/2023 PH1 390 of 2254

City of Vista Attachment D – Biological Resources Letter Report Tideline Kensho Residential Project – IS/MND P-22-0282 August 2023

This page left intentionally blank.
10/24/2023 PH1 391 of 2254

600 B Street, Suite 2000, San Diego, CA 92101 „ p: 619.236.1778 „ f: 619.236.1179 „ WeAreHarris.com May 1, 2023
Lev Gershman, Managing Partner
Tideline Partners
2148 Jimmy Durante Boulevard, Suite B
Del Mar, California 92014
Subject: Biological Resources Letter Report for the Tideline Kensho Residential Project Dear Mr. Gershman:

This letter report documents the results of the habitat assessment, biological resources survey, and aquatic resources delineation for the proposed Tideline Kensho Residential Project (Project) in the City of Vista in the County of San Diego, California (Attachment 1, Figures; Figure 1, Regional Location, and Figure 2, Project Site).

Harris conducted a biological resources field reconnaissance survey of the approximately five-acre Project site and a 100-foot buffer (approximately 15.35 acres in total) herein referred to as the “survey area.” The purpose of this document is to identify the presence of existing vegetation and wildlife species to assist in early planning and to identify potential biological constraints for developing the Project, including any potential aquatic resources impacts. In addition to results from field analyses conducted, a review of biological databases is provided in this analysis to aid in the constraints evaluation of the Project to its current immediate and surrounding environment.

Project Description and Location
The Project proposes a new residential development that would result in the construction of 183 dwelling units, including three three-story buildings and one four-story building with covered parking included in three of the four buildings. The Project also proposes off-site sidewalk improvements along the northern side of Lado De Loma Drive and Guajome Street from Eddie Drive to the northern and western sides of the Project site (i.e., the off-site improvements area). The majority of the Project site is undeveloped and has a single-family residence in the northern portion of the Project site and a second single-family residence and a recreational vehicle (RV) trailer on the southern portion of the Project site. Currently, the Project site is designated as Medium Density Residential (MD) with a maximum of ten dwelling units per acre. The site would be rezoned out of the Pheasant Hill Specific Plan and into the Downtown Vista Specific Plan (DVSP) and would also include a General Plan amendment, a zoning change, a Site Development Plan, and a Tentative Parcel Map.

The Project site is along the eastern side of Lado De Loma Drive, (Assessor’s Parcel Numbers 179-093-05, -09, -18, -23, -30, -32, and -34) in the City of Vista, California (Figures 1 and 2). The Project site is in a portion of the City containing both residential and commercial development. A single-family residential neighborhood borders the Project site from the northwest to the southeast, while the SPRINTER light-rail line borders the remaining sides of the site. On the other side of the SPRINTER tracks is commercial and multi-family residential development (Figure 2).

Environmental Setting
Land Use
The survey area is within a highly developed residential area in the City that also contains some commercial development. The Project site is primarily undeveloped open space, with a dirt road (Rhoda Lane) running along the eastern side of the Project site parallel to the SPRINTER tracks (Figure 2). The off-site improvements area occurs in the Guajome Street and Lado De Loma Drive roadways from just west of Mercantile Street on Guajome Street heading west, where it then turns into Lado De Loma Drive, ending at Eddie Drive (Figure 2). Rhoda Lane provides access to the single-family residences and RV trailer in the northern and southeastern portions of the 10/24/2023 PH1 392 of 2254

2 Project site. Guajome Street and Lado De Loma Drive provide connectivity between from major roadways in Vista (e.g., Vista Village Drive and South Santa Fe Avenue) and access to side streets in residential areas. Vegetation communities and land cover types on the Project site and in the off-site improvements area include non-native grassland, coast live oak woodland, disturbed habitat, and urban/developed land, with two non-vegetated channels that extend west to east through the center of the site.

The majority of the Project site is undeveloped, and the entire property has historically been disturbed with mowing and other mechanical disturbances, including repeated motor vehicle use through the center of the Project site, which has created a two-track trail with well-formed tire ruts. Rhoda Lane, the dirt access road on the eastern side of the Project site, is also frequently used by local residents. One single-family residence exists in the northern portion of the Project site, and a second single-family residence and an RV trailer exist on the southern portion of the Project site. The two single-family residences and RV trailer constitute the urban/developed land on the Project site.

The off-site improvements area along Guajome Street/Lado De Loma Drive is within a paved roadway bordered by commercial and residential development on both sides and follows a general west to east path. Many ornamental trees, shrubs, and succulents, as well as remnant native trees, line the roadway. Crossing perpendicular to Guajome Street near Mercantile Street to the east are the SPRINTER tracks, and Eddie Drive heading north provides the terminus of the off-site improvements area to the west along Lado De Loma Drive.

Guajome Street and Lado De Loma Drive are frequently used streets with moderately heavy vehicle traffic.

Topography and Soils
The survey area is characterized by the gently sloping hill on the Project site and the relatively flat areas along the off-site improvements area. The slope on the Project site is situated with the western half of the Project site higher in elevation and decreasing in elevation moving east across the Project site. Elevation ranges from approximately 108 feet to 129 feet above mean sea level. The topographic lines on Figure 3, USGS Topographic Map, represent the Project elevations. The off-site improvements area to the east along Guajome Drive sits lower in elevation and raises as it heads west along Lado De Loma Drive to Eddie Drive, with a slight decrease in elevation after Rancho Vista Road.

The survey area is underlain by Fallbrook sandy loam, Fallbrook-Vista sandy loam, and Salinas clay loam. The soil units on the Project site are presented on Figure 4, Soils. Fallbrook sandy loam (nine to 15 percent slopes) occurs across the majority of the Project site and in the off-site improvements area. Fallbrook-Vista sandy loam (nine to 15 percent slopes) occurs on the western edge of the Project site and in the central portion of the off-site improvements area. Salinas clay loam (zero to two percent slopes) occurs in small areas along the northeastern and southeastern edges of the Project site and the eastern end of the off-site improvements area. None of the soils on the Project site are defined as hydric (wetland) soils (USDA 2019).

Hydrology
The survey area is in the Carlsbad Watershed (Hydrologic Unit 904) (Project Clean Water 2023). The Carlsbad Watershed encompasses a land area of 211 square miles. It lies in the northern portion of San Diego County and neighbors the San Luis Rey Watershed to the north and the San Dieguito Watershed to the south.

The National Wetlands Inventory (NWI) and U.S. Geological Survey (USGS) National Hydrography Data (NHD) mapping results did not identify aquatic features in the survey area or off-site improvements area (Figure 5, National Wetlands Inventory Results). The non-vegetated, earthen-bottom Channels 1 and 2 observed in the center of the Project site and concrete-lined Channel 3 observed along the eastern edge of the survey area during the aquatic resources delineation survey were not identified on the NWI or NHD mapping results for the Project site and off-site improvements area (USFWS 2023a; USGS 2023). Channels 1 through 3 are discussed in detail in the Jurisdictional Aquatic Resources section in the Results section and Attachment 2, Aquatic Resources Delineation Report. No other aquatic resources were identified in the NWI and NHD mapping results or observed on the Project site or in the off-site improvements area.
10/24/2023 PH1 393 of 2254

3 Buena Vista Creek, a traditional navigable water (TNW) as defined by the U.S. Army Corps of Engineers (USACE), is approximately 0.5 mile north of Channels 1 through 3. Based on a review of the NWI and NHD results, Channels 1 through 3 are not documented as aquatic resources and do not connect to Buena Vista Creek or any other documented aquatic resources via surface water flow (USGS 2023; USACE 2023). However, Channel 3 may have a downstream connection to Buena Vista Creek through the municipal stormwater system. Channels 1 through 3 are discussed in detail in the Jurisdictional Aquatic Resources section in the Results section and Attachment 2.

Drainage patterns on the Project site show evidence of alteration, with on-site mechanical disturbances associated with the residential developments in the southern portion of the Project site and bordering the Project site to the north, west, and south. Channels 1 and 2 appear to have formed as a result of erosion from stormwater flows directed onto the Project site through a corrugated metal stormwater pipe on the western edge of the Project site. In addition to historical and recent disturbance of Channels 1 and 2 and across the Project site, the drainage patterns in and connected to the channels in the central portion of the Project site do not appear to be natural and are likely a result of urban stormwater management. Similarly, Channel 3 is an artificial, concrete-lined channel that was constructed to capture and direct stormwater flows away from the SPRINTER transit right-of-way.

Climate
Meteorological data for the survey area is gathered at the Vista National Oceanic and Atmospheric Administration weather station (EW3055) approximately 1.5 miles north of the survey area. Between 2002 and 2022, the average maximum temperature was 74 degrees Fahrenheit (°F), and the minimum temperature was 52°F (NRCS 2023).

The average annual precipitation over the last 20 years was approximately 12.94 inches. In 2022, the total rainfall was 8.07 inches, approximately 4.47 inches less than the previous year (NRCS 2023). Due to the temperate climate, the growing season is typically year-round.

Regulatory Setting
Federal
Clean Water Act
Section 401 (40 CFR 121). Section 401 of the Clean Water Act (CWA) gives the state authority to grant, deny, or waive certification of proposed federally licensed or permitted activities resulting in discharge to waters of the United States. The State Water Resources Control Board directly regulates multi-regional projects and supports the Section 401 certification and wetlands program statewide. The Regional Water Quality Control Board (RWQCB) regulates activities pursuant to Section 401(a)(1) of the federal CWA, which specifies that certification from the state is required for any applicant requesting a federal license or permit to conduct any activity including but not limited to the construction or operation of facilities that may result in any discharge into navigable waters.

The certification shall originate from the state or appropriate interstate water pollution control agency in/where the discharge originates or will originate. Any such discharge will comply with the applicable provisions of Sections 301, 302, 303, 306, and 307 of the CWA.

Section 404 (33 CFR 328.3[a]). These provisions regulate the discharge of dredged or fill material in waters of the United States, including wetlands. Activities that discharge dredge or fill material into waters of the United States can be authorized by the USACE.

The USACE and the U.S. Environmental Protection Agency (USEPA) have issued a set of guidance documents detailing the process for determining CWA jurisdiction over waters of the United States following the 2008 Rapanos decision. The USEPA and USACE issued a summary memorandum of the guidance for implementing the Supreme Court’s decision in Rapanos that addresses the jurisdiction over waters of the United States under the CWA. The complete set of guidance documents, summarized as key points below, were used to collect relevant data for evaluation by the USEPA and USACE to determine CWA jurisdiction over the Project and to complete the “significant nexus test” as detailed in the guidelines. 10/24/2023 PH1 394 of 2254

4 The significant nexus test includes consideration of hydrologic and ecologic factors. For circumstances such as those described in Key Point B below, the significant nexus test would take into account physical indicators of flow (evidence of an ordinary high water mark [OHWM]) if a hydrologic connection to a TNW exists and if the aquatic functions of the water body have a significant effect (more than speculative or insubstantial) on the chemical, physical, and biological integrity of a TNW. The USACE and USEPA will apply the significant nexus standard to assess the flow characteristics and functions of the tributary drainage to determine if it significantly affects the chemical, physical, and biological integrity of the downstream TNW.

Wetlands (including swamps, bogs, seasonal wetlands, seeps, marshes, and similar areas) are also considered waters of the United States and are defined by USACE as “those areas that are inundated or saturated by surface or groundwater at a frequency and duration sufficient to support, and that under normal circumstances do support, a prevalence of vegetation typically adapted for life in saturated soil conditions” (33 CFR 328.3[b]; 40 CFR 230.3[t]). Indicators of three wetland parameters (i.e., hydric soils, hydrophytic vegetation, and wetlands hydrology), as determined by field investigation, must be present for a site to be classified as a wetland by the USACE (USACE 1987).

Rapanos Guidance Key Points Summary
A. The USACE and USEPA will assert jurisdiction over the following waters:
x TNWs
x Wetlands adjacent to TNWs
x Non-navigable tributaries of TNWs that are relatively permanent (flows three months or longer) x Wetlands that abut such tributaries
B. The USACE and USEPA will decide jurisdiction over the following waters based on whether they have a significant nexus with a TNW:
x Non-navigable tributaries that are not relatively permanent x Wetlands adjacent to non-navigable tributaries that are not relatively permanent x Wetlands adjacent to but that do not directly abut a relatively permanent non-navigable tributary C. The USACE and USEPA will not assert jurisdiction over the following waters:
x Swales or erosional features (gullies, small washes characterized by low volume, infrequent, or short- duration flow)
x Ditches (including roadside ditches) excavated wholly in and draining only uplands and that do not carry a relatively permanent flow of water
The Navigable Waters Protection Rule, published by the USACE and USEPA on April 21, 2020, was vacated during a federal court ruling in Arizona (Pascua Yaqui Tribe v. USEPA) on August 30, 2021. With this ruling, the regulatory agencies have halted implementation of the Navigable Waters Protection Rule and are interpreting “waters of the United States” consistent with the pre-2015 regulatory regime (Rapanos guidance).

Endangered Species Act (U.S. Code, Title 16, Sections 1531 through 1543) The federal Endangered Species Act and subsequent amendments prohibit the “take” (i.e., harm, harass, or kill individuals or destroy associated habitat) of species federally listed as threatened or endangered. Take incidental to otherwise lawful activities can be authorized by the U.S. Fish and Wildlife Service (USFWS) through a permit under Sections 4(d), 7, or 10(a).

Migratory Bird Treaty Act (U.S. Code, Title 16, Sections 703 through 711) The Migratory Bird Treaty Act (MBTA) is the domestic law that affirms or implements a commitment by the United States to four international conventions (Canada, Mexico, Japan, and Russia) for the protection of a shared migratory bird resource. The MBTA makes it unlawful at any time, by any means, or in any manner to pursue, hunt, take, capture, or kill migratory birds. The law also applies to the removal of nests occupied by migratory 10/24/2023 PH1 395 of 2254

5 birds during the breeding season. The MBTA makes it unlawful to take, pursue, molest, or disturb these species, their nests, or their eggs anywhere in the United States.

State
Birds of Prey Protection Provision (California Fish and Game Code, Section 3503.5) This provision prohibits the taking of birds of prey (Order Falconiformes and Strigiformes), including their nests and eggs.

California Endangered Species Act (California Fish and Game Code, Section 2050 et seq.) The California Endangered Species Act prohibits any activities that would jeopardize or take a species designated as threatened or endangered by the state.

California Environmental Quality Act, as Amended (California Public Resources Code, Section 21000 et seq.) The goal of the California Environmental Quality Act (CEQA) is to assist California public agencies in identifying potentially significant negative environmental impacts caused by their actions and avoiding or mitigating those impacts when feasible.

California Fish and Game Code, Section 3503
California Fish and Game Code (CFGC), Section 3503, prohibits the take, possession, or needless destruction of the nests or eggs of any birds except as otherwise provided by the CFGC or any regulation made pursuant thereto.

California Fully Protected Wildlife Species Provision (California Fish and Game Code, Sections 3511, 4700, 5050, and 5515)
These provisions prohibit the take of fully protected birds, mammals, amphibians, and fish.

California Native Plant Protection Act of 1977 (California Fish and Game Code, Sections 1900–1913) These provisions preserve, protect, and enhance endangered or rare native plants of the state.

Lake and Streambed Alteration Agreement (California Fish and Game Code, Section 1600) CFGC Section 1602 regulates water resources in California. Activities that divert or obstruct the natural flow of or change or use material from the bed, channel, or bank of any river, stream, or lake may be authorized by the California Department of Fish and Wildlife (CDFW). CDFW jurisdiction includes intermittent and perennial watercourses and extends to the top of the bank of a stream or lake if unvegetated or to the limit of the adjacent riparian vegetation located contiguous to the watercourse if the stream or lake is vegetated.

Natural Community Conservation Planning Act, as Amended (California Fish and Game Code, Sections 2800–2835)
The primary objective of the Natural Community Conservation Planning program is to conserve natural communities at the ecosystem level while accommodating compatible land use. The program seeks to anticipate and prevent the controversies and gridlock caused by species’ listing by focusing on the long-term suitability of wildlife and plant communities and including key interests in the process.

Porter-Cologne Water Quality Control Act
The Porter-Cologne Water Quality Control Act (Porter-Cologne Act) is regulated by the RWQCB for impacts on waters of the state. The RWQCB is the regional agency responsible for protecting water quality in California. The jurisdiction of this agency includes all waters of the state and all waters of the United States as mandated by the CWA Section 401 and the Porter-Cologne Act. Although water quality issues related to impacts on waterways are normally addressed in Section 401 Water Quality Certification, should a water of the state be determined by the USACE not to have CWA jurisdiction, the Porter-Cologne Act would be addressed under a Construction General Permit, State General Waste Discharge Order, or Waste Discharge Requirements depending on the level of impact and the properties of the waterway.
10/24/2023 PH1 396 of 2254

6 Regional Water Quality Control Board
The RWQCB regulates impacts on water quality under Section 401 of the CWA. A project must comply with Section 401 of the CWA before the USACE can issue a Section 404 Permit. The RWQCB will issue a Section 401 Water Quality Certification or Waiver of Certification depending on the extent of impacts on waters of the United States.

The RWQCB also regulates impact on waters of the state (usually limited to “isolated” waters or swales that may not fall under USACE jurisdiction) under the Porter-Cologne Act.

Local
Downtown Vista Specific Plan
The DVSP was centered on the downtown core and extended outward along two major transportation corridors:

Vista Village Drive and South Santa Fe Avenue. The DVSP covered a total area of approximately 352 gross acres.

The primary goal of the DVSP was to stimulate reinvestment in older and underutilized properties to provide housing and commercial uses that would result in the re-creation of a dynamic downtown area. The DVSP established a vision for the downtown area as a place where residents and visitors could live, work, shop, and play. The DVSP served as a guide and directed new redevelopment, economic development, streetscape and traffic improvements, parking, pedestrian amenities, and mixed land uses in the Specific Plan Area over a 20-year planning period. A total of 1, 270 new dwelling units and 1, 866,737 additional square feet of development were proposed for the Specific Plan Area.

The DVSP was adopted and the DVSP Program Environmental Impact Report (DVSP PEIR) was certified on April 13, 2010, by the Vista City Council (City of Vista 2010). A Mitigation Monitoring and Reporting Program, Findings of Fact, and Statement of Overriding Considerations regarding the DVSP PEIR were also adopted in 2010. The DVSP was adopted in 2010 prior to the Vista General Plan 2030, which was adopted on February 28, 2012, and did not incorporate the goals and policies of the Vista General Plan 2030. The first addendum to the DVSP was approved in 2015 and modified the DVSP to incorporate the goals and policies of the Vista General Plan 2030 (City of Vista 2015). The amended DVSP provides a concise outline of regulations, policies, and guidelines modified to shape the redevelopment of the downtown area of the City through design regulations and guidelines, land use policies, parks and open space goals, mobility improvements, development incentives, and public health assessments.

The Project is designed to adhere to the DVSP and tiers off the DVSP PEIR (City of Vista 2015). The DVSP PEIR mitigation measures applicable to biological resources potentially impacted by implementation of the Project are incorporated into Project mitigation as detailed in the Proposed Mitigation section of this letter report.

North County Multiple Habitat Conservation Program
The North County Multiple Habitat Conservation Program (MHCP) is a comprehensive conservation planning process that addresses the needs of multiple plant and wildlife species in northwestern San Diego County (SANDAG 2003). The North County MHCP encompasses the cities of Carlsbad, Encinitas, Escondido, Oceanside, San Marcos, Solana Beach, and Vista. Its goal is to conserve approximately 19,000 acres of habitat, roughly 8,800 acres (46 percent) of which are already in public ownership and contribute toward the habitat preserve system for the protection of more than 80 rare, threatened, or endangered species. MHCP Subarea Plans for the cities of Carlsbad, Encinitas, Escondido, Oceanside, San Marcos, and Vista are being prepared and must be adopted by each city council, and implementing agreements with the CDFW and USFWS must be signed before Incidental Take Permits can be issued. When completed, the habitat preservation areas will serve as a key component of the region’s smart growth efforts by preserving habitat and open space and directing forecasted growth into appropriate areas.

The survey area is within the North County MHCP but not within the Focused Planning Area. However, an MHCP Subarea Plan for the City of Vista has not been approved and, therefore, is subject to the North County MHCP requirements but not the Vista MHCP Subarea Plan.
10/24/2023 PH1 397 of 2254

7 Vista General Plan 2030
The Vista General Plan 2030 was reviewed for relevant goals and policies related to biological resources and provides the following goals and policies that apply to sensitive species and vegetation (City of Vista 2012):
x RCS Goal 5: Preserve and protect, to the extent practicable, the range of natural biological communities and species native to the City and region; and conserve viable populations of endangered, threatened, and key sensitive species and their habitats.
x RCS Policy 5.5: Consider adoption of a tree preservation ordinance to address tree preservation on private property.
x RCS Goal 6: Implement the provisions of the regional Multiple Habitat Conservation Program (MHCP). x RCS Policy 6.5: Use the mitigation ratios established in the MHCP for impacts to sensitive biological habitats.

Methods
This biological resources analysis includes the results of a database review, biological resources surveys, and an aquatic resources delineation that serve to document the existing biological conditions of the survey area. The results of this review provide information on the potential constraints (or lack thereof) to Project development due to the presence (or absence) of sensitive biological resources.

Database Review
Review of online databases including the CDFW California Natural Diversity Database (CDFW 2023), USFWS NWI Wetlands Mapper (USFWS 2023a), USGS NHD (USGS 2023), USFWS Information for Planning and Consultation (USFWS 2023b), Consortium of California Herbaria database (CCH 2023), Calflora database (Calflora 2023), and California Native Plant Society (CNPS) Inventory of Rare and Endangered Plants of California (CNPS 2023) was conducted for the Project and within a one-mile radius of the survey area.

Field Reconnaissance Survey
On July 20, 2021; January 27, 2022; and January 19, 2023, Harris & Associates (Harris) conducted biological resources field reconnaissance surveys. The surveys were conducted by walking meandering transects throughout the survey area and mapping vegetation communities, documenting plant and wildlife species, noting suitable habitat, and evaluating the potential for occurrence of sensitive, rare, threatened, and endangered plant and wildlife species (Attachment 3, Species Observed). Vegetation mapping was recorded in the field using the ArcGIS Collector application with an aerial image of the survey area. Binoculars were used to visually identify wildlife species and listened for vocalizations. The results of the vegetation mapping are presented in Table 1, Vegetation Communities and Land Cover Types, in the Results section. The potential for sensitive plant and wildlife species to occur in the survey area is presented in Table 2, Sensitive Plant and Wildlife Species Potential to Occur on the Project Site, in the Results section. Representative photographs of the Project site are provided in Attachment 4, Photographic Log.

Aquatic Resources Delineation
Before conducting the delineation of jurisdictional waters field survey, existing background information was reviewed pertaining to potential aquatic resources from the following sources:
x Aerial photographs of the Project site and vicinity
x Historical and current aerial imagery (Google Earth 2023) x USFWS NWI to identify areas mapped as aquatic resources features (USFWS 2023a) x USDA Natural Resources Conservation Service Web Soil Survey (USDA 2019) Aquatic resources delineation fieldwork was conducted by a Harris aquatic resources specialist on July 20, 2021, with a follow-up survey conducted on January 19, 2023. The aquatic resources delineation was conducted using the routine on-site determination method described in the Corps of Engineers Wetlands Delineation Manual (USACE 1987) and the Regional Supplement to the Corps of Engineers Wetlands Delineation Manual: Arid West Region 10/24/2023 PH1 398 of 2254

8 (USACE 2008). The Harris aquatic resources specialist completed Arid West region OHWM datasheets for each unique aquatic resource feature on the Project site. The Project site was surveyed on foot to obtain total coverage.

As detailed in the 1987 USACE Wetlands Delineation Manual, 2008 Arid West Regional Supplement, and 2008 OHWM Guide, Harris collected and recorded data on vegetation, soil, and hydrological characteristics. The OHWM was determined based on the presence of the following characteristics in each unique aquatic resource feature:
presence of litter or debris from high flows, change in character of the soil, and destruction of terrestrial vegetation (USACE 2014). The aquatic resources data was collected using an iSXBlue II GPS receiver. The results of the aquatic resources delineation are presented in the Results section and Attachment 2.

Survey Limitations
Plants and wildlife were identified by direct observation, vocalizations, or other observance, including tracks, scat, and other signs. Therefore, lists of observed species are not necessarily comprehensive because the survey could be outside species blooming periods and/or they could be in senescence, nocturnal, or secretive or within the region (Project area) seasonally or during migration only and, therefore, may not have been observed.

Some areas were not directly surveyed due to a lack of habitat (i.e., developed areas), and other areas were not accessible on foot (i.e., private property). These areas were either not directly reviewed because of lack of habitat or were only able to be visually scanned rather than walked. Most of the off-site improvements area along Lado De Loma Drive, portions of Guajome Street, and areas immediately surrounding the Project site were not able to be surveyed on foot due to private property.

Results
The results presented below provide data from the biological resources and aquatic resources delineation surveys conducted on the Project site.

Vegetation Communities and Land Cover Types
Five vegetation communities and land use types were observed in the survey area. These include non-vegetated channel, non-native grassland, coast live oak woodland, disturbed habitat, and urban/developed land (Holland 1986; Oberbauer et al. 2008). It is important to note that aquatic resources were only mapped and delineated within a 20-foot boundary of the Project site and off-site improvements area in the survey area; however, a 100-foot buffer outside the Project site and off-site improvements area was surveyed, and vegetation communities and land cover types were mapped. Based on desktop reviews and in-field surveys, potential aquatic resources within the remaining 80 feet outside the 20 feet potentially include concrete-lined drainages that are mapped as “urban/developed” for the purposes of this document.

Table 1, Vegetation Communities and Land Cover Types, presents the acreages of the vegetation communities and land cover types that occur in the survey area. Figure 6, Vegetation Communities and Land Cover Types, presents the vegetation community and land cover type boundaries.

Table 1. Vegetation Communities and Land Cover Types
Vegetation Community and
Land Cover Type Project Site (acres)1
Off-Site Improvements
Area (acres)1 Survey Area (acres)1
Riparian
Non-vegetated channel (64200)2 0.02 0 0.02
Subtotal 0.02 0 0.02
Upland
Non-native grassland (42200) 0.19 0 0.27
Subtotal 0.19 0 0.27
10/24/2023 PH1 399 of 2254

9 Table 1. Vegetation Communities and Land Cover Types
Vegetation Community and
Land Cover Type Project Site (acres)1
Off-Site Improvements
Area (acres)1 Survey Area (acres)1
Woodland
Coast live oak woodland (71160) 0.26 0.05 0.31
Subtotal 0.26 0.05 0.31
Disturbed/Developed
Disturbed habitat (11300) 3.73 0.04 4.09
Urban/developed (12000) 0.38 0.69 11.26
Subtotal 4.11 0.73 15.35
Total 4.58 0.78 15.95
Sources: Holland 1986; Oberbauer et al. 2008.

Notes:
1 Total acreage rounded up to one-hundredth.
2 Within a 20-foot buffer of Project site and off-site improvements area only.

The vegetation communities and land cover types observed on the survey area and in the off-site improvements area are described in the following subsections.

Non-Vegetated Channel (64200)
Non-vegetated channel consists of predominantly sandy, gravelly, or rocky channels lacking or with reduced vegetation. Variable water lines inhibit the growth of vegetation, although some weedy species of grasses may grow along the outer edges of the channel. Vegetation may exist here but is usually less than ten percent of the total cover (Oberbauer et al. 2008).

Approximately 0.04 acre of non-vegetated channel (Channels 1 through 3) occurs through the central portion of the Project site and along the eastern edge of the survey area (Figure 6). Channels 1 and 2 are earthen-bottom channels, and Channel 3 is a concrete-lined channel.

Channel 1 is approximately 0.016 acre and begins on the western edge of the Project site at the discharge point of an approximately two-foot-diameter corrugated metal stormwater culvert. From this point, Channel 1 runs for approximately 309 linear feet where it becomes undefined in a dirt road (Rhoda Lane) that runs along the eastern side of the Project site. The stormwater culvert from which Channel 1 forms occurs in the off-site improvements area along the western side of the Project site.

Channel 2 is approximately 0.003 acre and begins in the disturbed uplands in the central portion of the Project site and extends east approximately 43 linear feet where the channel becomes undefined. Channel 2 might have been a historical stormwater flow path connected to Channel 1 but has been disturbed by mechanical earthmoving or vehicles and no longer appears to receive stormwater.

Channel 3 is approximately 0.02 acre and occurs along the eastern edge of the survey area, outside the Project site, within the SPRINTER transit right-of-way (Figure 6). Channel 3 enters the southeastern corner of the survey area and extends northwest approximately 893 linear feet where it ends in a disturbed upland area south of Guajome Street. Channel 3 is connected to a larger concrete channel to the east that is directed through a stormwater culvert under Guajome Street. Channel 3 occurs within disturbed habitat, urban/developed land, and non-native grassland.

Channels 1 through 3 are discussed in detail in the Jurisdictional Aquatic Resources section and Attachment 2.

Non-Native Grassland (42200)
Non-native grassland consists of a dense to sparse cover of flowering annual grasses measuring approximately three feet high. It may occur where disturbance by maintenance (e.g., mowing, scraping, disking, spraying), 10/24/2023 PH1 400 of 2254

10 grazing, repetitive fire, agriculture, or other mechanical disruption has altered soils and removed native seed sources from areas formerly supporting native vegetation. Non-native grassland typically occurs adjacent to roads or other developed areas where some historical disturbance has occurred. Native wildflowers are often associated with this community, especially in years of favorable rainfall. Common plant species observed in non-native grasslands in the County include wild barley (Hordeum murinum), ripgut grass (Bromus diandrus), slender wild oat (Avena barbata), and foxtail (Bromus madritensis) (Oberbauer et al. 2008).

Approximately 0.27 acre of non-native grassland occurs in the survey area, 0.19 of which occurs in the southeastern corner of the Project site (Figure 6). Non-native grassland on the Project site is dominated by slender wild oat, barley (Hordeum sp.), and smilo grass (Stipa miliacea).

Coast Live Oak Woodland (71160)
Coast live oak woodland is dominated by coast live oak (Quercus agrifolia) with a poorly developed shrub layer that can include toyon (Heteromeles arbutifolia), gooseberry (Ribes spp.), and laurel sumac (Malosma laurina) or is dominated by black elderberry (Sambucus nigra) (Oberbauer et al. 2008). The herb layer of coast live oak woodland is continuous and dominated by ripgut brome and several other introduced grasses.

Approximately 0.26 acre of coast live oak woodland occurs in the central and western portions of the Project site, and 0.05 acre occurs in the off-site improvements area for a total of 0.31 acre in the survey area (Figure 6). The coast live oak woodland on the Project site is dominated by interior coast live oak (Quercus agrifolia var. oxyadenia) with disturbed open areas, non-native grasses, and weeds for the understory.

Disturbed Habitat (11300)
Disturbed (ruderal) habitat is a land cover type that shows evidence of great mechanical alteration by human activities and is no longer recognizable as a native or naturalized vegetated habitat but still retains soil substrate that is either devoid of vegetation (i.e., disced, plowed areas or dirt trails) or has vegetative cover that is dominated by non-native species. These non-native species are typically ruderal exotic species that take advantage of disturbance, such as short-pod mustard (Hirschfeldia incana), black mustard (Brassica nigra), filaree (Erodium spp.), and other weedy grass species, or they may be escaped ornamentals from adjacent properties.

These species are opportunistic and typically found in recently and/or repeatedly disturbed habitats, particularly in areas that have been graded, have been cleared for fuel management or agricultural purposes, and/or have experienced ongoing mechanical disturbance that prevents natural habitat from revegetating.

Approximately 4.09 acres of disturbed habitat occurs throughout the survey area, 3.73 acres of which covers the Project site, and 0.04 acre of which is found in the off-site improvements area (Figure 6). Disturbed habitat on the Project site and in the off-site improvements area is dominated by bare ground and mustard species with other scattered non-native grass and weed species. The disturbed habitat on the Project site appears to be disturbed by motor vehicle use and is mowed periodically.

Urban/Developed (12000)
Urban/developed land includes areas that have been constructed on or otherwise physically altered to an extent that native vegetation is no longer supported. Urban/developed land is characterized by permanent or semi- permanent structures, pavement or hardscape, and landscaped areas that often require irrigation.

Approximately 11.26 acres of urban/developed land occurs in the survey area, 0.38 acre of which occurs in the northern and southern portions of the Project site (including two single-family residences and one RV trailer) and

0.69 acre of which occurs in the off-site improvements area (Figure 6).

Jurisdictional Aquatic Resources
Three non-wetland water channels were observed on the Project site (Figure 7, Aquatic Resources). One approximately 0.016-acre (309-linear-foot) earthen-bottomed non-wetland water, Channel 1, was observed starting on the western edge of the Project site at the outfall of an approximately two-foot-diameter corrugated metal pipe and extending west to east through the central portion of the Project site where it becomes undefined 10/24/2023 PH1 401 of 2254

11 as it disappears into a dirt road (Rhoda Lane) that runs along the eastern side of the Project site (Figure 7). One approximately 0.003-acre (43-linear-foot) earthen-bottomed non-wetland water, Channel 2, was observed starting in the disturbed uplands in the central portion of the Project site and extending east where it becomes undefined as it meets with the Rhoda Lane dirt road that runs along the eastern side of the Project site (Figure 7).

One approximately 0.02-acre (893-linear-foot) concrete-lined non-wetland water, Channel 3, was observed entering the southeastern corner of the survey area and ending in a disturbed upland area south of Guajome Street (Figure 7). Channel 3 is connected to a larger concrete channel to the east that is directed through a stormwater culvert under Guajome Street.

Based on database and on-site delineation results, Channels 1 and 2 were determined to be isolated, ephemeral non-wetland waters that do not have a surface connection to a TNW or other off-site aquatic resources and are preliminarily not under the jurisdiction of the USACE, RWQCB, or CDFW pursuant to CWA Sections 401 and 404 and CFGC Section 1602. Channel 3 may have a downstream connection to Buena Vista Creek through the municipal stormwater system and is preliminarily under the jurisdiction of the USACE, RWQCB, or CDFW pursuant to CWA Sections 401 and 404 and CFGC Section 1602. Only the agencies can make a final determination of jurisdictional boundaries.

The non-vegetated earthen-bottom Channels 1 and 2 observed in the center of the survey area and concrete-lined Channel 3 observed along the eastern edge of the survey area during the aquatic resources delineation fieldwork were not identified on the NWI or NHD mapping results (USFWS 2023a; USGS 2023). The two non-vegetated channels appear to have formed as a result of erosion from stormwater flows directed onto the Project site through a corrugated metal stormwater pipe on the western edge of the Project site. Channel 3 is an artificial, concrete-lined channel that was constructed to capture and direct stormwater flows away from the SPRINTER transit right-of-way. No other aquatic resources were identified in the NWI or NHD mapping results or observed in the survey area or off-site improvements area during the survey.

A detailed discussion of the aquatic resources delineation and results is included in Attachment 2.

Plant Species
Attachment 3 lists the vascular plant species observed in the survey area during the 2021 and 2022 biological resources surveys. A total of 65 plants were observed in the survey area, 20 (31 percent) of which were native and 45 (69 percent) of which were non-native. None of the 65 plant species observed on the Project site are considered sensitive.

Wildlife Species
Attachment 3 lists the wildlife species observed in the survey area during the 2021 and 2022 biological resources surveys. A total of 30 wildlife species were observed, 27 (90 percent) of which were native and three (10 percent) of which were non-native. In total, one reptile, four invertebrates, 20 birds, and five mammals were observed in the survey area. Of the 30 wildlife species observed, four are considered sensitive: monarch butterfly (Danaus plexippus), great blue heron (Ardea herodias), red-shouldered hawk (Buteo lineatus), and southern mule deer (Odocoileus hemionus fuliginata). These four sensitive wildlife species observed in the survey area are described in the Sensitive Species section and are shown on Figure 8, Sensitive Wildlife Species Observations.

Common bird species in the survey area included Anna’s hummingbird (Calypte anna), American crow (Corvus brachyrhynchos), California towhee (Melozone crissalis), house finch (Haemorhous mexicanus), Cassin’s kingbird (Tyrannus vociferans), and mourning dove (Zenaida macroura).

Sensitive Species
Sensitive species are those recognized by federal, state, or local agencies as being potentially vulnerable to impacts because of rarity, local or regional reductions in population numbers, isolation/restricted genetic flow, or other factors. Special-status plants include those listed as threatened or endangered, proposed for listing, or candidates for listing by the USFWS and CDFW; those considered sensitive by the CDFW and County of San Diego; and those species included in the California Rare Plant Rank (CRPR) inventory maintained by the CNPS. Sensitive 10/24/2023 PH1 402 of 2254

12 wildlife species include those listed as threatened or endangered, proposed for listing, or candidates for listing by the USFWS and CDFW or those considered sensitive by the CDFW and County of San Diego.

As described in the Methods section, distributions of historical sensitive species observations within the Project vicinity were reviewed in preparation of this letter report. For the purposes of this biological resources assessment, those species that either are known to occur or have some potential to occur within a one-mile radius of the Project site and that have potential to occur based on available habitat are addressed in this section. The list of potentially occurring sensitive plant and wildlife species is provided in Table 2, Sensitive Plant and Wildlife Species Potential to Occur on the Project Site, along with an assessment of their potential for occurrence in the survey area. Figure 9, Plant and Wildlife Species with Potential to Occur, shows the sensitive species documented within a one-mile radius of the Project site if found through a database.

Table 2. Sensitive Plant and Wildlife Species Potential to Occur on the Project Site Scientific Name
Common
Name
Status
Federal/State/
CRPR/Regional Habitat Potential to Occur
Plants
Brodiaea filifolia Thread-
leaved
brodiaea
None/None/
1B.1/County List
A
Occurs in chaparral,
cismontane woodland,
coastal scrub, valley
and foothill grassland,
and vernal pools at
elevations between 80
to 3,675 feet amsl.

Blooms March through
June.

Not Expected. No suitable chaparral,
cismontane woodland, coastal scrub,
valley and foothill grassland, or vernal pool
habitat occurs. The Project site is mostly
disturbed and dominated by non-native
grass and weed species. No habitat
available in the off-site improvements
area or larger survey area. Critical habitat
occurs northwest of the Project site
(Figure 10, Critical Habitat). Historical
locations exist approximately one mile
southwest of the survey area but not
within (Figure 9) (CDFW 2023; CNPS
2023).

Ceanothus
verrucosus
Wart-
stemmed
ceanothus
None/None/
2B.2/County List
B
Occurs in chaparral at
elevations between five
to 1,245 feet amsl.

Blooms December
through May.

Not Expected. No suitable chaparral
habitat occurs. Project site is mostly
disturbed and dominated by non-native
grass and weed species. Off-site
improvements area mainly developed.

Historical locations exist approximately 0.5
mile northeast of the survey area but not
within (Figure 9) (CDFW 2023; CNPS
2023).

Wildlife
Invertebrates
Danaus
plexippus
(California
overwintering
population)
Monarch
butterfly1
None/ST/–/
County Group 2
Occurs in a variety of
habitats where patches
of milkweed (Asclepias
sp.), the monarch
caterpillar host plant,
are present.

Overwinters in groves
of eucalyptus, cypress,
and pine along the
California coast and
high-elevation forests
in Mexico.

Present. Observed flying through the
Project site during the 2021 surveys.

Limited suitable nectar sources for
foraging are present. No milkweed
patches suitable as host plants for
caterpillars to occupy occur on the Project
site. A small number of pine trees suitable
for overwintering are available on the site
(Figure 8).
10/24/2023 PH1 403 of 2254

13 Table 2. Sensitive Plant and Wildlife Species Potential to Occur on the Project Site Scientific Name
Common
Name
Status
Federal/State/
CRPR/Regional Habitat Potential to Occur
Euphydryas
editha quino
Quino
checkerspot
butterfly
FE/None/–/
County Group 1
Occurs in chaparral and
coastal sage
shrublands. Requires
dot-seed plantain
(Plantago erecta) or
owl’s clover (Castilleja
exserta) as a host plant.

Not Expected. No suitable nectar sources
for foraging occur in the survey area. No
suitable host plants were observed in the
survey area. Historical locations exist
approximately 0.75 mile north of the
survey area but not within (Figure 9)
(CDFW 2023).

Reptiles
Diadophis
punctatus similis
San Diego
ringneck
snake
None/SSC/–/
County Group 2
Occurs in moist
habitats, including wet
meadows, rocky
hillsides, gardens,
farmland, grassland,
chaparral, mixed
coniferous forests, and
woodlands.

Not Expected. No suitable moist
meadows, gardens, grassland, chaparral,
forest, or rocky hillsides occur in the
survey area. Historical locations exist
approximately 0.75 mile north of the
survey area but not within (Figure 9)
(CDFW 2023).

Phrynosoma
blainvillei
Blainville’s
horned
lizard
None/SSC/–/
County Group 2
Occurs in coastal sage
scrub, chaparral, and
grasslands in primarily
loose soils. Forages
primarily on harvester
ants.

Not Expected. No suitable scrub or
chaparral habitat occurs on the Project
site. The survey area is mostly disturbed
and dominated by non-native grass and
weed species or is developed. Historical
locations exist approximately 0.5 mile
north and west of the survey area but not
within (Figure 9) (CDFW 2023).

Thamnophis
hammondii
Two-striped
garter snake
None/SSC/–/
County Group 1
Occurs near water
sources, including pools
and creeks, often in
rocky areas. Common
in oak woodland,
willow forest, coastal
sage scrub, scrub oak,
sparse pine, chaparral,
and brushlands.

Not Expected. No suitable willow forest,
coastal sage scrub, scrub oak, sparse pine,
chaparral, and brushlands or oak
woodland near water sources occur in the
survey area. Historical locations exist
approximately 0.75 mile north of the
survey area but not within (Figure 9)
(CDFW 2023).

Birds
Ardea herodias
(rookery)
Great blue
heron
None/None/–/
County Group 2
Year-round resident in
the County. Occurs in
wetlands but uses dry
land to forage for small
mammals (i.e., pocket
gophers). Colonial
nester found in tall
trees, such as
eucalyptus trees in
groves.

Present. Great blue heron individual
observed foraging in the middle of the
Project site (Figure 8).

Buteo lineatus Red-
shouldered
hawk
None/None/–/
County Group 1
Occurs year-round in
low elevation riparian
and oak woodlands.

Nests in dense
riparian and oak
habitats but is known
Present. Red-shouldered hawks were
observed flying over the survey area
during the 2021 biological survey.

Suitable nesting and foraging habitats
occur throughout the survey area in
10/24/2023 PH1 404 of 2254

14 Table 2. Sensitive Plant and Wildlife Species Potential to Occur on the Project Site Scientific Name
Common
Name
Status
Federal/State/
CRPR/Regional Habitat Potential to Occur
to nest in eucalyptus
trees as well. Forages
in open spaces and on
the edges of mesic
habitats.
mature oak trees and other tall trees
and open areas, respectively (Figure 8).

Laterallus
jamaicensis
Black rail None/SSC/–/
County Group 2
Occurs in coastal
wetlands and tidal
marshes, often
associated with
marshes of pickleweed
for nesting. Extirpated
from San Diego County
(Unitt 2004).

Not Expected Nesting. Not Expected
Foraging. No wetlands suitable for nesting
or foraging occur in the survey area.

Extirpated from San Diego County (Unitt
2004). Historical location exists
approximately 0.25 mile north of the
survey area but not within (Figure 9)
(CDFW 2023).

Mammals
Chaetodipus
fallax fallax
Northwestern
San Diego
pocket
mouse
None/SSC/–/
County Group 2
Found in Southern
California to central Baja
California within rocky,
sandy, herbaceous
habitats with shrubs for
foraging and cover.

Prefers coastal sage
scrub habitats.

Low. Suitable sandy, herbaceous areas
occur in the non-native grassland and
disturbed habitat openings on the Project
site, but no shrub cover for foraging or
cover is present. No suitable habitat
elsewhere in survey area. Historical location
exists approximately 0.25 mile north of the
survey area but not within (Figure 9) (CDFW
2023).

Choeronycteris
mexicana
Mexican
long-
tongued bat
None/SSC/
None/County
Group 2
Migratory, requires
columnar cactus, night-
blooming agave, and
other ornamentally
planted species for
foraging. Roosts in deep
rock crevices, caves, and
other deep, dimly lit
spaces. In San Diego
County, known to roost
under porches, decks,
patios, buildings,
warehouses, and other
such areas.

Moderate Roosting. High Foraging. Not
known to occur within region; however,
buildings and structures with deep recesses
are available in the survey area, as are
ornamentally planted species that could be
used for foraging.

Dipodomys
stephensi
Stephens’
kangaroo rat
FE/SE/–/County
Group 1
Occurs in 16 known
localities from Riverside
south to Vista, east to
Warner Springs, and in
the Ramona grasslands.

Only occupies open
(non-dense) grasslands
dominated by annual
forbs or very spare
scrub bushes (less than
30 percent) that contain
extensive bare ground
that lacks clay or rocky
Not Expected. No preferred habitat exists in
survey area, and the survey area is not
within current known occupied areas.

Historical location exists approximately

0.75 mile west of the survey area but not
within (Figure 9) (CDFW 2023).
10/24/2023 PH1 405 of 2254

15 Table 2. Sensitive Plant and Wildlife Species Potential to Occur on the Project Site Scientific Name
Common
Name
Status
Federal/State/
CRPR/Regional Habitat Potential to Occur
soils. Most abundant on
gentle slopes or flat
slopes; not found on
steep slopes. Known to
occur and move into
areas that have burned
or fallowed fields.

Lasiurus
xanthinus
Western
yellow bat
None/SSC/–/
None/WBWG: H
Usually found in urban
or suburban
environments where
non-native trees and
artificial water sources
are found. Roosts
primarily in the dead
fronds (“skirts”) of
native and non-native
fan palms. Also roosts in
cottonwood trees and
yuccas. Strongly
associated with native
groves of California fan
palm (where there is
open surface, spring-fed
water sources). Also
occurs in desert riparian
areas.

High Roosting. Moderate Foraging. A
number of palms with untrimmed dead
fronds (or “skirts”) are available in the
survey area, but no nearby permanent
open water areas for foraging occur.

Historical location exists approximately 0.5
mile northwest and one mile south of the
survey area but not within (Figure 9) (CDFW
2023).

Myotis
yumanensis
Yuma myotis None/SSC/–/
County Group 2/
WBWG: L
Inhabits open
woodlands adjacent to
water for foraging.

Occurs throughout
California but is
uncommon in the
deserts and elevations
above 8,000 feet amsl.

Nocturnal insectivore
that roosts in crevices,
caves, and mines and
underneath bridges.

Low Roosting. Low Foraging. No caves,
mines, or bridges suitable for roosting
habitat occur in survey area. No open water
areas adjacent to the coast live oak
woodland suitable for foraging occur.

Historical location exists approximately one
mile south of the survey area but not within
(Figure 9) (CDFW 2023).

Odocoileus
hemionus
fuliginata
Southern
mule deer
None/None/–/
County Group 2
Occurs in grasslands,
woodlands, and sparse
shrub communities.

Present. Tracks observed on the Rhoda
Lane dirt road on the eastern-central
side of the Project site. Limited suitable
habitat occurs in the woodland,
grassland, and disturbed open areas on
the Project site (Figure 8).

Notes: amsl = above mean sea level; CRPR = California Rare Plant Rank; None = no status indicated for species; WBWG = Western Bat Working Group
Bold = present on site
Federal Status: FC = federal candidate; FE = federally endangered State Status: SE = state-listed as endangered; SSC = state species of special concern; ST = state threatened CRPR: 1B = species rare, threatened, or endangered in California and elsewhere; 2B = species rare, threatened, or endangered in California but more common elsewhere; 0.2 = species fairly threatened in California 10/24/2023 PH1 406 of 2254

16 County of San Diego
County of San Diego Sensitive Animals List: Group 1 = very high level of sensitivity, either because the species is listed as threatened or endangered or because it has very specific natural history requirements that must be met; Group 2 = less common but not yet so rare that extirpation or extinction is imminent without immediate action County of San Diego Sensitive Plants List: A = rare, threatened, or endangered in California and elsewhere; B = rare, threatened, or endangered in California but more common elsewhere
Western Bat Working Group: H = high; M = medium; L = low Plant Species
No sensitive plant species were observed or determined to have a potential to occur in the survey area (Table 2).

Wildlife Species
Sensitive wildlife species observed in the survey area and others not observed but that have high potential to occur are described in detail in the following subsection. Sensitive wildlife species observation locations are provided on Figure 8.

Sensitive Wildlife Species Observed
Four sensitive wildlife species, monarch butterfly, great blue heron, red-shouldered hawk, and southern mule deer, were observed in the survey area and are described in the following subsections.

Monarch Butterfly
Monarch butterfly is under review for protection under the federal Endangered Species Act as of March 2020 (USFWS 2023c), and a County Group 2 species. Monarch butterfly occurs in patches of milkweed (Asclepias sp.), the monarch caterpillar host plant. Monarch butterflies are found across North America wherever suitable feeding, breeding, and overwintering habitat exists. Monarchs overwinter in groves of eucalyptus, cypress, and pine along the California coast and high-elevation forests in Mexico (Xerces Society 2017). Threats to this species include habitat loss, climate change, and agriculture.

Adult monarch butterflies were observed flying through the Project site during the 2021 survey. No milkweed patches occur on the Project site or in the overall survey area that would be suitable for monarch butterfly caterpillars to occupy (Figure 8). A small number of pine trees suitable for overwintering occur on the Project site and throughout the survey area.

Great Blue Heron
Great blue heron is a County Group 2 species. The great blue heron is very large, gray-blue wading bird with a long neck and orangish-yellow bill. Adults have a white head and face with a long black stripe from above their eye toward the back of their head on either side and distinct black head plumes. Typically, they are found in areas with aquatic resources, wading through the water or standing still to strike prey. Prey items include frogs, toads, fish, snakes, salamanders, and other species near aquatic resources. This species is also known to forage in dry areas looking for toads, snakes, lizards, and other small mammals (i.e., pocket gophers) to feed on. Typically, most great blue herons build stick nests in trees, adding to them year after year. The majority of the nesting pairs in the County are concentrated at six large colonies. However, the occasional few pairs will nest individually if not in smaller groups. This species is non-migratory in Southern California and can be found in the County year-round.

A great blue heron was observed foraging on the Project site during the 2023 survey (Figure 8). While the Project site provides little to no nesting opportunities, the survey area may provide an opportunity in the tall eucalyptus trees for a small group. However, no great blue heron stick nests were observed during the 2021, 2022, and 2023 surveys. It is likely that this individual may nest elsewhere outside the survey area.

Red-Shouldered Hawk
Red-shouldered hawk is a County of San Diego Group 1 species. Red-shouldered hawk is a medium-sized hawk with rounded wings and medium-length fan-shaped tails. Adults have a reddish barring on their breasts with white and dark checkered wings and a thickly barred tail. Red-shouldered hawk is widespread over San Diego County’s coastal slope and absent only from areas that are devoid of tall trees, such as Otay Mountain. The inland valleys 10/24/2023 PH1 407 of 2254

17 of northern San Diego County have the most concentrated population, with suitable riparian woodland, scattered rural residences, orchards, and eucalyptus grove habitats (Unitt 2004). It hunts by gliding below the canopy and feeds on a variety of prey, including small mammals, reptiles, amphibians, young or small birds, and large insects.

Adults construct large stick nests about halfway up a large tree, next to main tree trunk or on top of old squirrel, hawk, or raven nests.

Red-shouldered hawks were observed flying over the Project site and off-site improvements area, primarily over the southern portion of the Project site, during the 2021 biological survey (Figure 8). Suitable nesting and foraging habitat occur throughout the survey area.

Southern Mule Deer
Southern mule deer is a County of San Diego Group 2 species. This species inhabits a variety of habitats in San Diego County, including coastal sage scrub to chaparral, oak and riparian woodlands, conifer-hardwood forests in the mountains, and riparian woodland and desert scrub on the eastern slopes of the mountains. Southern mule deer generally prefers vegetation that provides woody cover, meadow and shrubby openings for foraging, and water. Southern mule deer uses south-facing slopes more frequently during the winter and north-facing slopes more during the summer (Tremor et al. 2017).

Southern mule deer tracks were observed on the Rhoda Lane dirt road on the eastern-central side of the Project site during the 2022 survey (Figure 8). Limited suitable habitat for refugia or foraging occurs in the woodland and grassland areas on the Project site. The site is most likely used as a movement corridor, connecting to other areas of more suitable undisturbed habitat, which dominates the survey area, away from development.

Sensitive Wildlife Species Not Observed but with High Potential to Occur Two sensitive wildlife species, Mexican long-tongued bat (Choeronycteris mexicana) and western yellow bat (Lasiurus xanthinus), were not observed in the survey area but have high potential to occur and are described in detail in the following subsection. Although neither of these bat species was observed in the survey area, it is important to note that no nocturnal or acoustic surveys were conducted in the survey area.

Mexican Long-Tongued Bat
Mexican long-tongued bat is a California species of special concern and a County of San Diego Group 2 species. It is a relatively large bat that has a long snout with a leaf-like projection at the tip of its nose. It is sooty gray to brown above and pale below. Mexican long-tongued bats feed on pollen, nectar, fruit of agaves (century plants), columnar cacti, and other nectar-producing plants (typically ornamentals) and may supplement their diet with insects. They prefer to roost in crevices including deep rock crevices, caves, and other deep, dimly lit spaces.

Uniquely in San Diego County, they have been known to roost exclusive in human-made structures under porches, decks, patios, buildings, warehouses, and other such areas. They roost in small numbers rather than large colonies with hundreds to thousands of individuals (Tremor et al. 2017).

The survey area contains abundant ornamental plantings including century plants, birds-of-paradise, and other species that may attract Mexican long-tongued bats. While this species has moderate potential to be found roosting in the survey area, it has high potential to be found foraging in the survey area.

While there is potential for Mexican long-tongued bat to be found temporarily roosting or foraging in the survey area, it is important to note that it is a migratory species and is only expected to be found in the County between September and March.

Western Yellow Bat
Western yellow bat is a California species of special concern. It is a medium to large species with dull yellowish fur and contrasting black wings. Unlike others in the Lasiurus genus, its tail is only partially, rather than completely, furred. It has small ears and a “pug-like” face with small black eyes. Western yellow bats are known to eat beetles, flies, moths, grasshoppers, crickets, and other insects. It can be found foraging over swimming pools and open water sources. This species roosts exclusively in foliage, particularly in the “skirts” of dead fronds around trunks 10/24/2023 PH1 408 of 2254

18 of untrimmed both native and non-native palms but is found in ornamentally planted trees, including orchards and urban fruit trees. It has also been known to roost in cottonwood trees and yuccas (Tremor et al. 2017).

Western yellow bats have high potential to be found roosting in the survey area. Numerous palms with heavy dead frond “skirts” and trees are suitable for roosting. There is moderate potential for this species to be found foraging since open water and swimming pools are limited, but other insects, including moths, are likely to be plentiful and can be found in the survey area for this species to consume.

Roosting Bats
While no bats were observed using the survey area for roosting or foraging during the survey, no nighttime focused acoustic surveys were conducted. As previously discussed, database search results identified known historical locations for western yellow bat and Mexican long-tongued bat, both California species of special concern, within one mile of the survey area. Both have potential to be found roosting and foraging in the survey area.

Although bats that avoid areas heavily used by humans may not be observed, the availability of suitable roosting habitat (i.e., buildings, trees) and suitable foraging habitat (i.e., open grassy areas, ornamental plantings) indicates that bats more common to urban and suburban environments or habitat “generalist” species have potential to be found in the survey area. Common species including Mexican free-tailed bats (Tadarida brasiliensis), California myotis (Myotis californicus), big brown bat (Eptesicus fuscus), and hoary bat (Lasiurus cinereus), which can be found roosting in buildings, crevices, and trees and forage over agricultural and open space areas, are likely to be found in the survey area.

Nesting Birds
While no active nests were observed in the survey area, the Project site and off-site improvements area potentially provide nesting habitat for several bird species, including raptors, which are protected under the CFGC and MBTA.

A nesting bird survey was not conducted as part of the biological reconnaissance surveys.

As previously discussed, adult red-shouldered hawks were observed flying over the Project site and off-site improvements area. While not observed actively nesting on site, the oak and eucalyptus trees provide suitable nesting habitat, and the open areas of the site provide foraging opportunities. The red-shouldered hawks might use trees near to the Project site and off-site improvements area for nesting.

The interior coast live oaks, pines, and non-native trees, as well as ornamental and native shrubs and other vegetation, throughout the Project site and off-site improvements area provide suitable nesting habitat. An abundance of birds were observed foraging and calling throughout the areas surrounding the Project site and directly in and immediately surrounding the off-site improvements area. The grassland habitat on the Project site is small and fragmented from other larger grassland habitats. No grassland nesting birds were observed during the survey, and there is low to moderate potential for grassland nesting birds to be found on the Project site.

Critical Habitat
The potential presence of critical habitat in the survey area was also analyzed. No critical habitat for sensitive plant or wildlife species occurs in the survey area. Critical habitat for sensitive plant species thread-leaved brodiaea (Brodiaea filifolia) occurs approximately two miles northwest of the survey area. Critical habitat for the sensitive wildlife species coastal California gnatcatcher (Polioptila californica californica) occurs between approximately 1.5 and 2.5 miles west, south, and southwest of the survey area. Critical habitat for these species is shown on Figure 10, Critical Habitat.

Wildlife Corridors and Linkages
Wildlife corridors provide routes for local movement and regional linkages and corridors, often following linear topographic, vegetation, or water features. These corridors can be continuous habitats, features, or “stepping stone” areas, providing critical rest and foraging areas for, for example, birds traveling along migratory routes.

Local routes of movement provide constant connections to resources that include sources of water, home/cover sites, and foraging areas. Regional linkages and movement corridors provide larger patches of open space to allow 10/24/2023 PH1 409 of 2254

19 relatively free movement of wildlife species along multiple paths between important resources. These areas allow for not only long-term genetic flow between subpopulations but also critical pathways of seasonal/migratory movements. Larger predatory mammals often use regional corridors for hunting and reproduction needs.

Potential wildlife corridors can include streams, riparian areas, and culverts under roadways. Habitat characteristics considered included topography, habitat quality, and adjacent land uses.

The Project site and off-site improvements area are surrounded by urban development, with single-family residential neighborhoods to the north, west, and south; commercial development to the northeast; and the SPRINTER tracks to the east (Figure 2). Therefore, the presence of dense urban and commercial development surrounding the Project site and off-site improvements area limits large-scale east–west and north–south wildlife movement in the surrounding area. While the Project site is relatively open, it is unlikely to serve as a major route for movement or as a significant connection to open space areas, although it may provide some opportunities for local movement and connectivity. This is evidenced by the southern mule deer tracks on Rhoda Lane, showing that this dirt road passing through the Project site is used as a movement route. While disturbed, the Project site is a mostly open area in a dense urban environment, which lends to its potential for use as a movement route to higher-quality habitat and open space areas. Nesting and foraging opportunities on the site are somewhat limited despite the presence of several trees. However, the mature trees on and surrounding the Project site have the potential to provide some habitat for nesting birds for migration connectivity both locally and regionally. Similarly, the off-site improvements area has abundant nesting and foraging opportunities but is not considered open and has no native habitat coverage of significance; therefore, it does not provide major local movement and regional linkage and corridor space.

Significance of Project Impacts and Proposed Mitigation Significance Criteria
Direct impacts occur when biological resources are altered or destroyed during the course of or as a result of Project implementation. Examples of such impacts include removing or grading vegetation, filling wetland habitats, or severing or physically restricting the width of wildlife corridors. Other direct impacts may include loss of foraging or nesting habitat and loss of individual spec ies as a result of habitat clearing. Indirect impacts may include elevated levels of noise or lighting, changes in surface water hydrology within a floodplain, and increased erosion or sedimentation. These types of indirect impacts can affect vegetation communities or their potential use by sensitive species. Permanent impacts may result in irreversible damage to biological resources. Temporary impacts are interim changes in the local environment due to construction and would not extend beyond Project- associated construction, including revegetation of temporarily disturbed areas adjacent to native habitats.

Appendix G of the CEQA Guidelines (CEQA Guidelines 15000 et seq.) defines “significant effect on the environment” as a “substantial, or potentially substantial adverse change in the environment.” Appendix G of the CEQA Guidelines further indicates that there may be a significant effect on biological resources if the Project would:
a. Have a substantial adverse effect, either directly or through habitat modifications, on any species identified as a candidate, sensitive, or special status species in local or regional plans, policies, or regulations, or by the California Department of Fish and Game[1] or U.S. Fish and Wildlife Service. b. Have a substantial adverse effect on any riparian habitat or other sensitive natural community identified in local or regional plans, policies, regulations or by the California Department of Fish and Game or U.S. Fish and Wildlife Service.
c. Have a substantial adverse effect on state or federally protected wetlands (including, but not limited to, marsh, vernal pool, coastal, etc.) through direct removal, filling, hydrological interruption, or other means. d. Interfere substantially with the movement of any native resident or migratory fish or wildlife species or with established native resident or migratory wildlife corridors, or impede the use of native wildlife nursery sites.

1 As of January 1, 2012, the California Department of Fish and Game became the California Department of Fish and Wildlife. 10/24/2023 PH1 410 of 2254

20 e. Conflict with any local policies or ordinances protecting biological resources, such as a tree preservation policy or ordinance.
f. Conflict with the provisions of an adopted Habitat Conservation Plan, Natural Community Conservation Plan, or other approved local, regional, or state habitat conservation plan.

Threshold A
Guidelines for Determination of Significance
A significant impact would result if the Project would have a substantial adverse effect, either directly or through habitat modifications, on any species identified as a candidate, sensitive, or sensitive species in local or regional plans, policies, or regulations or by the CDFW or USFWS.

This significance guideline is taken directly from the CEQA Guidelines, Appendix G, and is based on the CEQA Guidelines definition of mandatory findings of significance (Section 15065) and of endangered, rare, or threatened species (Section 15380).

Analysis
Potential impacts on sensitive plant and wildlife species are discussed in the following subsections.

Sensitive Plant Species
As discussed in the Results section, no sensitive plant species were observed or determined to have a potential to occur on the Project site or in the off-site improvements area. Further, the small areas of non-native grassland and coast live oak woodland and larger areas of disturbed habitat on the Project site have a low potential to support sensitive plant species, and the off-site improvements area is developed and does not provide suitable habitat (Table 2). Therefore, Project implementation would not result in impacts on sensitive plant species.

Impacts on sensitive plant species would be less than significant, and no mitigation would be required.

Sensitive Wildlife Species
The Project has the potential to result in direct and indirect impacts on sensitive wildlife species. Four sensitive wildlife species, monarch butterfly, great blue heron, red-shouldered hawk, and southern mule deer, were observed on or over the Project site and in or over the off-site improvements area during the 2021 and 2022 surveys. One sensitive species, western yellow bat, has high potential to be found roosting on the Project site. A second bat species, Mexican long-tongued bat, has high potential to be found foraging but not roosting on the Project site.

No other sensitive wildlife species were observed in the survey area, and no sensitive wildlife species were determined to have a high or moderate potential to occur in the survey area (Table 2). The sensitive wildlife species with a low potential to occur were not observed in the survey area during the 2021, 2022, and 2023 surveys.

Direct Impacts
Three sensitive vegetation communities, non-vegetated channel, non-native grassland, and coast live oak woodland, which could support sensitive wildlife species, were observed on the Project site or in the off-site improvements area (Table 2). The disturbed habitat on the Project site or in the off-site improvements area is not considered a sensitive vegetation community and is unlikely to support sensitive wildlife species, as discussed further in this section.

Table 3, Impacts on Sensitive Vegetation Communities, presents the total sensitive vegetation community acreages on the Project site and the permanent impacts from implementation of the Project. 10/24/2023 PH1 411 of 2254

21 Table 3. Impacts on Sensitive Vegetation Communities Vegetation Community and
Land Cover Type Project Site (acres)1 Off-Site Improvements Area (acres)1
Permanent Impacts
(acres)1
Riparian
Non-vegetated channel (42200) 0.02 <0.001 0.02
Upland
Non-native grassland (42200) 0.19 0 0.19
Woodland
Coast live oak woodland (71160) 0.26 0.05 0. 31
Total 0.47 0.05 0.52
Sources: Holland 1986; Oberbauer et al. 2008.

Notes:
1 Acreages rounded up to one-hundredth
Permanent impacts on sensitive vegetation communities, including approximately 0.02 acre of non-vegetated channel, 0.19 acre of non-native grassland, and 0.31 acre of coast live oak woodland, would occur from Project implementation (Figure 11, Biological Resources Impacts).

The non-vegetated channel that runs through the central portion of the Project site is highly disturbed and eroded and is unlikely to provide suitable habitat for sensitive plant or wildlife species. Impacts on non-vegetated channel would result in less than significant impacts on sensitive plant and wildlife species, and no mitigation would be required.

The non-native grassland in the southeastern portion of the Project site is small, highly disturbed, and surrounded by disturbed habitat and the Rhoda Lane dirt road to the west, north, and south and the SPRINTER tracks to the east. The non-native grassland on the Project site has a low potential to provide suitable habitat for sensitive plant or wildlife species because the area is small, fragmented, and shows evidence of regular disturbance from mowing and vehicle activity. Impacts on non-native grassland would result in less than significant impacts on sensitive plant and wildlife species, and no mitigation would be required.

The coast live oak woodland on the Project site provides suitable nesting habitat for bird species protected by the MBTA and CFGC, including red-shouldered hawk, which was observed on and surrounding the Project site during the 2021 survey. In addition, it may provide roosting habitat for sensitive bats. Removal of the potential nesting and foraging habitat could result in significant impacts on sensitive birds and raptors, and mitigation would be required.

The disturbed habitat on the Project site is primarily bare ground and mowed non-native grasses and other non-native annuals that provide marginal foraging habitat for sensitive mammals, raptors, and other sensitive bird species. The shrubs and non-native trees in the southern, southeastern, and central portions and around the edges of the Project site provide nesting habitat for sensitive and migratory bird species, including red-shouldered hawk, which were observed on and surrounding the Project site during the 2021 survey. Removal of the potential nesting and foraging habitat could result in significant impacts on sensitive birds and raptors, and mitigation would be required.

Southern mule deer tracks were observed on the Rhoda Lane dirt road on the east-central side of the Project site during the 2022 survey. The small areas of coast live oak woodland and non-native grassland and the disturbed open areas on the Project site provide limited suitable foraging and refugia habitat for southern mule deer. There is limited cover, a large number of residences and human activity on and surrounding the Project site, and little to no sources of water to support southern mule deer as a resident species. Therefore, impacts on southern mule deer would be less than significant, and no mitigation would be required. An adult great blue heron was observed on the Project site during the 2023 survey. No stick nests were observed in the survey area. Therefore, the Project is unlikely to impact nesting great blue herons; impacts would be less than significant, and no mitigation is required. Adult monarch butterflies were observed flying through the Project site during the 2021 survey.

However, no milkweed that would support monarch butterfly reproduction occur on the Project site. In addition, 10/24/2023 PH1 412 of 2254

22 the small number of pines suitable for overwintering habitat are unlikely to support overwintering monarch butterflies. Impacts on monarch butterfly would be less than significant, and no mitigation would be required.

Indirect Impacts
Indirect impacts on sensitive wildlife species that occur on the Project site during Project construction could include noise, dust deposition, increased soil erosion, increased human activity, introduction of non-native species, and increased potential of exotic species invasion due to soil disturbance and construction vehicles and personnel. Implementation of the Project has the potential to drive sensitive wildlife species, primarily red- shouldered hawk and other nesting bird species, from the Project site because of noise, equipment operation, and human activity. Disturbance of potential nesting habitat on the Project site could result in potentially significant impacts on sensitive bird and raptor species, and mitigation would be required.

Indirect impacts from Project operation, including noise, lighting, human activity, and predation by pets, could result in potentially significant permanent impacts on sensitive wildlife species that occur on the Project site, and mitigation would be required.

Nesting Birds
Project implementation has the potential to impact bird and raptor species that are protected under the MBTA and CFGC Section 3503. As discussed in the Results section, adult red-shouldered hawks were observed flying over the Project site during the 2021 survey, potentially nesting in mature trees on or surrounding the Project site and off-site improvements area. The coast live oak, pine, and non-native trees, primarily in the southern, southeastern, and central portions of the Project site, provide nesting habitat for many bird species. If construction is conducted during the general bird breeding season (January 15 through August 31), temporary direct impacts from disturbance and displacement of nesting birds during vegetation removal could result in significant direct impacts on bird species protected under the MBTA and CFGC, and mitigation would be required. Indirect impacts from construction noise and vibration during clearing, grubbing, and trenching activities, if conducted during the bird breeding season, could result in significant indirect impacts on bird species protected under the MBTA and CFGC, and mitigation would be required.

Threshold B
Guidelines for Determination of Significance
A significant impact would result if the Project would have a substantial adverse effect on any riparian habitat or other sensitive natural community identified in local or regional plans, policies, or regulations or by the CDFW or USFWS.

Analysis
As previously discussed under Threshold A, three sensitive vegetation communities, non-vegetated channel, non- native grassland, and coast live oak woodland, occur on the Project site (Figure 6).

Permanent impacts would occur on the three sensitive vegetation communities on the Project site, including approximately 0.02 acre of non-vegetated channel, 0.19 acre of non-native grassland, and 0.31 acre of coast live oak woodland (Figure 11; Table 3). Therefore, permanent impacts on sensitive vegetation communities from implementation of the Project would be significant, and mitigation would be required.

Threshold C
Guidelines for Determination of Significance
A significant impact would result if the Project would have a substantial adverse impact on state- and federally protected wetlands and non-wetland waters as defined by CWA Sections 401 and 404 through direct removal, filling, hydrological interruption, or other means. Impacts on state or federally jurisdictional aquatic resources would be considered significant and would require permits from the USACE and RWQCB. Aquatic resources delineations would be required for any impacts on potentially jurisdictional aquatic resources. 10/24/2023 PH1 413 of 2254

23 Analysis
As discussed in the Results section, three aquatic resources, Channels 1 through 3, were observed in the survey area (Figure 7). Channels 1 and 2 were determined to be isolated, ephemeral non-wetland waters that do not have a surface connection to a TNW or other off-site aquatic resources and do not carry a relatively permanent flow of water. Therefore, Channels 1 and 2 may not be considered jurisdictional by the USACE, RWQCB, and/or CDFW pursuant to CWA Sections 401 and 404 and CFGC Section 1602. Channel 3 could have a downstream connection to Buena Vista Creek through the municipal stormwater system and may be considered jurisdictional by the USACE, RWQCB, and/or CDFW pursuant to CWA Sections 401 and 404 and CFGC Section 1602. However, only the agencies can make a final determination of jurisdictional boundaries.

Direct Impacts
As discussed in the Project Description and Location section, the Project would develop the entire Project site and result in direct permanent impacts on Channels 1 and 2 (Figure 11). Implementation of the Project would not result in direct impacts to Channel 3 (Figure 11). Although Channels 1 and 2 were preliminarily determined to not be under the jurisdiction of federal or state agencies, only the USACE, RWQCB, and CDFW can make a final determination of jurisdictional boundaries. Therefore, permanent direct impacts on potentially federal and state jurisdictional aquatic resources would be significant, and mitigation would be required.

Threshold D
Guidelines for Determination of Significance
The Project would have a significant impact on wildlife movement and nursery sites if its development interferes substantially with the movement of any native resident or migratory fish or wildlife species or with established native resident or migratory wildlife corridors, or impedes the use of native wildlife nursery sites.

Analysis
The Project site is completely surrounded by urban development, with single-family residential neighborhoods to the north, west, and south; commercial development to the northeast; and the SPRINTER tracks to the east (Figure 2). Due to the presence of the surrounding urban development, the Project site is unlikely to provide major movement and dispersal areas for wildlife species or connections to open space areas. However, as discussed under Threshold A, the small number of trees on the Project site have the potential to provide habitat for birds for migration connectivity both locally and regionally.

While some areas on the Project site have the potential to provide live-in habitat for both sensitive and common reptile, bird, invertebrate, and mammal species, the Project site does not support regional wildlife corridors or linkages. Therefore, implementation of the Project would not result in significant impacts on wildlife corridors or nursery sites, and no mitigation would be required.

Threshold E
Guidelines for Determination of Significance
A significant impact would result if the Project would conflict with any local policies or ordinances protecting biological resources, such as a tree preservation policy or ordinance.

Analysis
The Project would comply with the local policies or ordinances protecting biological resources identified in the Vista General Plan 2030 and DVSP. Therefore, no impacts would occur to local policies or ordinances from implementation of the Project, and no mitigation would be required. 10/24/2023 PH1 414 of 2254

24 Threshold F
Guidelines for Determination of Significance
A significant impact would result if the Project would conflict with the provisions of an adopted Habitat Conservation Plan, Natural Community Conservation Plan, or other approved local, regional, or state Habitat Conservation Plan.

Analysis
The Project site is within the North County MHCP and complies with the requirements for areas not within the Focused Planning Area. Therefore, no impacts on Local Conservation Plans would occur from the implementation of the Project, and no mitigation would be required.

Proposed Mitigation
Mitigation would be required to compensate for any permanent, temporary, direct, indirect, and cumulative impacts on sensitive biological and aquatic resources that would be considered significant under CEQA and federal and state law. Implementation of the following mitigation would reduce these impacts to a level below significance.

DVSP Mitigation Measure BIO-1: For all future projects in the SPA on a site, which is mapped by the City as supporting a sensitive vegetation type, surveys for sensitive plant and animal species shall be conducted by a qualified biologist during the appropriate season as part of, or prior to, the Project planning or design phase. If sensitive plant or animal species are observed, they shall be avoided if possible. If impacts cannot be avoided, the significance of the impacts to those species must be evaluated in compliance with CEQA and any significant impacts shall be mitigated based on the recommendations of the qualified biologist and the mitigation requirements of the North County MHCP Table 8-8, or the City of Vista Subarea Plan, if adopted prior to approval of a grading permit for the future Project.

Project Implementation of DVSP Mitigation Measure BIO-1: The Project would implement Mitigation Measure BIO- 1 from the DVSP to mitigate for sensitive plant and animal species anticipated to occur on the Project site, as follows:
x To prevent potential impacts to sensitive roosting bats, a biological monitor should be present during tree removal. If trees need to be trimmed, lower limbs should be cut or trimmed first before cutting upper limbs.

If trees need to be completely removed, trees should be cut down in a staggered fashion to give any potential roosting bats a chance to flee. Avoid removal of ornamental plantings that may be potential nectar sources for Mexican long-tongued bat between September and March when the species is most likely to be observed foraging on the Project site or in the off-site improvements area. x Impacts on approximately 0.19 acre of non-native grassland shall be mitigated at a 0.5:1 ratio for a total of

0.10 acre of required mitigation for private development that occurs outside the North County Multiple Habitat Conservation Plan Focused Planning Area. Mitigation shall consist of the off-site acquisition of 0.10 acre of non-native grassland mitigation credits. The wildlife agencies (i.e., USFWS and CDFW) and the City of Vista shall approve the location and habitat quality of the off-site mitigation site. x Impacts on approximately 0.31 acre of coast live oak woodland shall be mitigated at a 2:1 ratio for a total of

0.62 acre of required mitigation for private development that occurs outside the North County Multiple Habitat Conservation Plan Focused Planning Area. Mitigation shall consist of the off-site acquisition of 0.62 acre of coast live oak woodland mitigation credits. The wildlife agencies and the City of Vista shall approve the location and habitat quality of the off-site mitigation site. x The applicant shall be responsible for replacement of any existing coast live oaks that are impacted by construction activities on the site at a minimum ratio of 2:1. The replacement oaks shall be at minimum 48- inch box specimens of the same species existing on site and shall be planted on site and/or in an off-site location in the City of Vista in an area determined to provide long-term biological value, as determined by the City Planner in consultation with the wildlife agencies. The applicant shall be responsible for preparation of a revegetation plan for the coast live oaks. The revegetation plan shall be prepared by a biologist approved by the City of Vista with expertise in Southern California ecosystems and native plant revegetation techniques.

The revegetation plan shall be submitted to the City Planner for approval prior to issuance of any grading 10/24/2023 PH1 415 of 2254

25 permit. The applicant shall submit proof of a binding agreement ensuring maintenance and monitoring of the replacement coast live oak trees for a five-year period. The agreement shall be subject to approval of the City Planner prior to issuance of any grading permit.

DVSP Mitigation Measure BIO-2: For all future projects in the SPA located on a site adjacent to or traversed by Buena Vista Creek, a qualified biologist, shall determine if the Project would have the potential to impact the adjacent waterway. If the waterway would be potentially impacted by the Project, the qualified biologist shall determine if the waterway meets the criteria for a jurisdictional wetland or water of the U.S. by the USACE or a streambed or bank under the jurisdiction of the CDFW. If it is determined that the waterway is jurisdictional, the applicant shall obtain the following permits, as necessary. x Authorization for the fill of jurisdictional waters of the U.S. from the USACE through the CWA Section 404 permitting process;
x A water quality certification pursuant to Section 401 of the CWA; and/or x Authorization for the alteration of streambeds and banks within the state under Section l602 of the CFGC.

Project Implementation of DVSP Mitigation Measure BIO-2: The Project would implement Mitigation Measure BIO-2 from the DVSP PEIR by consulting with the USACE, RWQCB, and CDFW to determine jurisdictional authority over the on-site aquatic resources. If required, permits shall be issued before impacts on jurisdictional aquatic resources occur by the USACE, RWQCB, and CDFW. Before construction in any areas containing jurisdictional aquatic features, the applicant shall obtain authorizations pursuant to Sections 401 and 404 of the CWA and Section 1602 of the CFGC.

If required by the USACE, RWQCB, and CDFW, compensatory mitigation shall be implemented to mitigate impacts on jurisdictional aquatic resources. This mitigation shall be in the form of credit purchases at an approved wetlands mitigation bank, in-lieu fee mitigation, or other permittee responsible mitigation as approved by the agencies.

Report of waste discharge pursuant to California Water Code, Section 13050, shall be required for waters of the state determined to be non-jurisdictional under Sections 404 and 401 of the CWA. Any measures required as part of the issuance of the Report of Waste Discharge shall be implemented.

Authorization for the alteration of streambeds and banks of the state shall be required under Section 1602 of the CFGC, and a Streambed Alteration Agreement application shall be required prior to work occurring in CDFW jurisdictional areas. Mitigation requirements determined through the process of obtaining the necessary permits shall be implemented before the start of construction.

DVSP Mitigation Measure BIO-3: Prior to initiation of Project construction on a site within the SPA during the raptor nesting season (generally March 1 through August 15), where suitable trees for raptor nesting occur on the Project site or within 500 ft of the site, pre-construction surveys for raptor nests shall be performed by a qualified biologist. If there are no raptors nesting (which includes nest building or other breeding/nesting behavior) within 500 ft of the site, clearing shall be allowed to proceed. Construction activities within 500 ft of active nests shall not be allowed to resume during the breeding season until a qualified biologist determines that the nest is no longer active.

Project Implementation of DVSP Mitigation Measure BIO-3: The proposed Project would implement DVSP Mitigation Measure BIO-3 by preventing the grubbing, trimming or clearing of vegetation from the Project site or off-site improvements area during the general bird breeding season (January 15 through August 31). If grubbing, trimming, or clearing of vegetation cannot feasibly occur outside the general bird breeding season, the qualified biologists, as approved by the City of Vista, shall perform a pre-construction nesting bird survey no more than 72 hours before the start of vegetation grubbing, trimming, or clearing to determine if active bird nests are present in the affected areas. If one or more active nests are found during the pre-construction survey, a buffer of appropriate size based on species (i.e., 200 ft for passerines and 500 ft for raptors) or observed behavior shall be established around the nest, and no disturbance shall be allowed within the buffer until a qualified biologist determines that the nest is no longer active. If no nesting birds (including nest building or other breeding or nesting behavior) are on the Project site, grubbing, trimming, or clearing shall proceed. 10/24/2023 PH1 416 of 2254

26 When construction occurs during the bird breeding season, a qualified biologist shall conduct a weekly nest survey of the area within 100 ft of construction to survey for nesting migratory birds and raptors.

Level of Significance After Mitigation
As discussed in Threshold A, Project construction and operation would not result in significant impacts on sensitive plant species, and no mitigation would be required.

As discussed in Threshold A, Project construction and operation would result in potentially significant temporary and permanent direct and indirect impacts on sensitive nesting birds and raptors and roosting bats. With implementation of Mitigation Measures BIO-1 through BIO-3, temporary and permanent direct and indirect impacts on sensitive nesting birds and raptors and roosting bats from Project construction would be reduced to a less than significant level.

As discussed in Threshold B, Project construction and operation would result in significant permanent direct impacts on three sensitive vegetation communities, non-vegetated channel, non-native grassland, and coast live oak woodland. With implementation of Mitigation Measures BIO-1 through BIO-3, permanent direct impacts on sensitive vegetation communities from Project construction would be reduced to a less than significant level.

As discussed in Threshold C, Project construction could result in potentially significant permanent direct impacts on potentially federally and state-protected non-wetland water Channels 1 and 2. With implementation of Mitigation Measure BIO-2, permanent direct impacts on potentially federally and state-protected aquatic resources would be reduced to a less than significant level.

As discussed in Thresholds D–F, the Project would not result in significant impacts on wildlife corridors and linkages, conflicts with local policies and ordinances, or regional conservation planning, and no mitigation would be required.

Cumulative Impacts
Implementation of the Project would not contribute to the cumulative loss of biological resources in the City or County. When combined with other projects nearby or in the region, the Project has the potential to contribute to cumulatively significant impacts through the direct and indirect impacts on nesting birds and raptors and roosting bats, direct impacts on sensitive vegetation communities, and direct impacts on potentially federally and state-protected aquatic resources. However, these impacts would be mitigated to a less than significant level with the implementation of Mitigation Measures BIO-1 through BIO-3 that are consistent with the mitigation requirements of the DVSP and North County MHCP, as detailed in the Proposed Mitigation and Level of Significance After Mitigation sections. Therefore, cumulative impacts would be less than significant.

Preparers
Harris & Associates
Emily Mastrelli, Principal Biologist
Katie Laybourn, Biologist
If you have any questions regarding this letter report, please do not hesitate to contact Emily Mastrelli at [email protected] or (619) 510-5372.

Sincerely,

Emily Mastrelli Katie Laybourn
Principal Biologist Biologist/Aquatic Resources Specialist [email protected]
(619) 510-5372
10/24/2023 PH1 417 of 2254

27 Attachments
1, Figures
2, Aquatic Resources Delineation Report
3, Species Observed
4, Photographic Log
References
Calflora. 2023. Calflora Database. Accessed May 2023. https://www.calflora.org/ .

CCH (Consortium of California Herbaria). 2023. “Consortium of California Herbaria (CCH).” Accessed May 2023. https://ucjeps.berkeley.edu/consortium/about.html .

CDFW (California Department of Fish and Wildlife). 2023. California Natural Diversity Database (CNDDB). Accessed May 2023. https://wildlife.ca.gov/Data/CNDDB .

City of Vista. 2010. Downtown Vista Specific Plan Update Program Environmental Impact Report (SCH No. 2009061018). March 11.

City of Vista. 2012. Vista General Plan 2030. April 2012. Accessed May 2023. https://www.cityofvista.com/city- services/city-departments/community-development/building-planning-permits-applications/vista- general-plan-2030.

City of Vista. 2015. Addendum No. 1 to the Downtown Specific Plan Update Program Environmental Impact Report. State Clearinghouse No. 2009061018.

CNPS (California Native Plant Society). 2023. Inventory of Rare and Endangered Plants of California. Online edition, v9-01 1.5. Accessed May 2023. http://www.rareplants.cnps.org/ .

Google Earth. 2023. “City of Vista.” Accessed May 2023. https://www.google.com/earth/ .

Holland, Robert F. 1986. Preliminary Descriptions of the Terrestrial Natural Communities of California. October.

NRCS (National Resources Conservation Service). 2023. National Water and Climate Center: WETS Table. Accessed May 2023. https://www.wcc.nrcs.usda.gov/climate/navigate_wets.html .

Oberbauer, Thomas, Meghan Kelly, and Jeremy Buegge. 2008. Draft Vegetation Communities of San Diego County.

Based on Preliminary Descriptions of the Terrestrial Natural Communities of California prepared by Robert F. Holland, PhD, in October 1986. Codes revised by Thomas Oberbauer in February 1996, revised and expanded by Meghan Kelly in August 2006, and further revised and reorganized by Jeremy Buegge in March 2008. Accessed May 2023. https://www.sandiegocounty.gov/content/dam/sdc/pds/ceqa/ Soitec-Documents/Final-EIR-Files/references/rtcref/ch9.0/rtcrefaletters/O14%202014-12- 19_OberbauerTM2008.pdf.

Project Clean Water. 2023. “Carlsbad WMA.” Accessed April 2023. http://www.projectcleanwater.org/carlsbad-wma/ .

SANDAG (San Diego Association of Governments). 2003. North County MHCP. March. Accessed May 2023. https://www.sandag.org/index.asp?projectid=97&fuseaction=projects.detail .

Tremor, Scott, Drew Stokes, Wayne Spencer, Jay Diffendorfer, Howard Thomas, Susan Chivers, and Philip Unitt, eds. 2017. San Diego County Mammal Atlas. August 1.

Unitt, Philip. 2004. San Diego County Bird Atlas. October 31.

USACE (U.S. Army Corps of Engineers). 1987. Corps of Engineers Wetlands Delineation Manual. Final. Wetlands Research Program Technical Report Y 87 1. Online edition. Prepared by Environmental Laboratory, U.S. Army Corps of Engineers, Waterways Experiment Station. Wetlands Research Program. January. Accessed May 2023. http://www.cpe.rutgers.edu/Wetlands/1987-Army-Corps-Wetlands-Delineation-Manual.pdf . 10/24/2023 PH1 418 of 2254

28 USACE. 2008. Regional Supplement to the Corps of Engineers Wetlands Delineation Manual: Arid West Region (Version 2.0). Final. ERDC/EL TR-08-28. Prepared by Environmental Laboratory, U.S. Army Engineer Research and Development Center. Wetlands Regulatory Assistance Program. September. Accessed May 2023. https://usace.contentdm.oclc.org/utils/getfile/collection/p266001coll1/id/7627 .

USACE. 2014. A Guide to Ordinary High Water Mark (OHWM) Delineation for Non-Perennial Streams in the Western Mountains, Valleys, and Coastal Region of the United States. ERDC/CRREL TR-14-13. Prepared by Matthew K. Mersel and Robert W. Lichvar. Cold Regions Research and Engineering Laboratory, U.S. Army Engineer Research and Development Center. Wetlands Regulatory Assistance Program (WRAP). August. Accessed May 2023. https://usace.contentdm.oclc.org/utils/getfile/collection/p266001coll1/id/7645 .

USACE. 2023a. “TNWs & Navigable Waters in Los Angeles District.” Accessed May 2023. https://www.spl.usace.army.mil/Missions/Regulatory/Jurisdictional-Determination/ Navigable-Waterways/.

USDA (U.S. Department of Agriculture). 2019. Web Soil Survey. Natural Resources Conservation Service, Soil Survey Staff.

Last modified July 31. Accessed May 2023. http://websoilsurvey.sc.egov.usda.gov/App/HomePage.htm .

USFWS (U.S. Fish and Wildlife Service). 2023a. National Wetlands Inventory Wetlands Mapper. Accessed May 2023. https://www.fws.gov/wetlands/data/Mapper.html .

USFWS. 2023b. Information for Planning and Consultation (IPaC). Accessed May 2023. https://ecos.fws.gov/ipac/ .

USFWS. 2023c. “Assessing the Status of the Monarch Butterfly.” Accessed May 2023. https://www.fws.gov/ savethemonarch/SSA.html.

USGS. 2023. National Hydrography Dataset. Accessed May 2023. https://www.arcgis.com/home/webmap/viewer.html?url=https://hydro.nationalmap.gov/arcgis/rest/se rvices/nhd/MapServer&source=sd.

Xerces Society. 2017. New Guidelines for Protecting California’s Butterfly Groves. Prepared by Emma Pelton.

November 8. Accessed May 2023. https://xerces.org/blog/new-guidelines-for-protecting-californias- butterfly-groves.

10/24/2023 PH1 419 of 2254

Attachment 1. Figures

10/24/2023 PH1 420 of 2254

This page intentionally left blank.

10/24/2023 PH1 421 of 2254

Da
t
e
:

1 /
2 4
/
2 0
2 3

-

L
a
s
t

s
a
v
e
d

b
y
:

R
a
n
d
y
.

D
e
o
d
a
t

-

P
a
t
h
:

C
:
\
G
I
S
\
P
r
o
j
e
c
t
s
\
C
i
t
y

o
f

V
i
s
t
a
\
T
i
d
e
l
i
n
e

P
h
e
a
s
a
n
t

H
i
l
l
\
M
a
p

D
o
c
s
\
B
i
o
\
B
i
o
L
e
t
t
e
r
\
F
i
g
u
r
e
1 _
R
e
g
i
o
n
a
l
L
o
c
a
t
i
o
n
.
m
x
d
Imperial
Beach
Chula
Vista
National
City Bonita
Lemon
Grove
Poway
Encinitas
Carlsbad Escondido
Vista Valley
Center
Hidden
MeadowsOceanside
Bonsall
Fallbrook
Rainbow
JamulSpring
Valley
AlpineHarbison
Canyon
Lakeside
Pine
Valley
El Cajon
Santee
Ramona San Diego
Country
Estates
Julian
Temecula
Wildomar
Cam
San Diego
ge C
o
u
n
t
y
San Diego County
Riverside County

MEXICOMEXICO
Pacific Ocean
ÄÆ52
ÄÆ54 ÄÆ94
ÄÆ94ÄÆ163
ÄÆ282
ÄÆ188ÄÆ905
ÄÆ54
ÄÆ274
ÄÆ74
ÄÆ209
ÄÆ79
ÄÆ56
ÄÆ75 ÄÆ125
ÄÆ74
ÄÆ79ÄÆ67
ÄÆ76
ÄÆ79
ÄÆ78
§¨¦5
§¨¦215
§¨¦5
§¨¦8
§¨¦15
§¨¦8
§¨¦5
§¨¦8
§¨¦805
§¨¦5
§¨¦15
Tideline Kensho Residential Project
Incorporated Areas
Draft North County MSCP
Pre-Approved Mitigation Area for
Draft North County MSCP
Subarea Plan
MSCP South County Subarea
Regional Location
Source: ESRI 2021.

Figure 1±0105
Miles
Project Site
!(^
10/24/2023 PH1 422 of 2254

O
C
E
A
N
VI
E
W

C
T
LYO
N

C
R
TER
R
A
C
E
DR
RA
N
C
H
O

V
I
S
T
A

R
D
EUCA
L
Y
P
T
U
S

A
V
E
L

M
I
R
A
S
O
PAR
K

A
V
GUAJ
O
M
E

S
T
AS
T
R
O

C
T
UNN
A
M
E
D

5 5
T
H

R
D
H
A
C
I
E
N
D
A

D
R
BAN
D
I
N
I

P
L
OCE
A
N

V
I
E
W

D
R
U
N
I
T
Y

W
Y
S

S
A
N
T
A

F
E

A
V
P
I
N
A

L
N

HILDALE CR

RANCHO V
I
S
T
A

P
L
M
E
R
C
A
N
T
I
L
E

S
T
PETE
R
S

D
R

LADO DE
L
O
M
A

D
R
ED
D
I
E

D
R
Project Site
Off-Site Improvements
Survey Area
Da
t
e
:

1 /
2 4
/
2 0
2 3

-

L
a
s
t

s
a
v
e
d

b
y
:

R
a
n
d
y
.

D
e
o
d
a
t

-

P
a
t
h
:

C
:
\
G
I
S
\
P
r
o
j
e
c
t
s
\
C
i
t
y

o
f

V
i
s
t
a
\
T
i
d
e
l
i
n
e

P
h
e
a
s
a
n
t

H
i
l
l
\
M
a
p

D
o
c
s
\
B
i
o
\
B
i
o
L
e
t
t
e
r
\
F
i
g
u
r
e
2 _
P
r
o
j
e
c
t
S
i
t
e
.
m
x
d
Source: Maxar Imagery 2021.
±0300150
Feet Project Site
Source: Maxar Imagery 2021.

Figure 2
Tideline Kensho Residential Project
Poway
Encinitas
Carlsbad
Escondido
Vista
Valley
Center
Hidden
MeadowsOceanside
Bonsall
Fallbrook
Rainbow
Alpine
Harbi

s
o
n
Canyon
Lak

e
s

i
d
e
Santee
Ramona
San Diego
Country
Estates
Dana
Point
Capistrano Te

m
e

c
u

l
a
San Diego
San Die
g
o
County
San Diego County
Riverside Cou

n
t
y
Project Site
!(^
10/24/2023 PH1 423 of 2254

ÄÆ78
Project Site
Off-Site Improvements
Survey Area
Da
t
e
:

1 /
2 4
/
2 0
2 3

-

L
a
s
t

s
a
v
e
d

b
y
:

R
a
n
d
y
.

D
e
o
d
a
t

-

P
a
t
h
:

C
:
\
G
I
S
\
P
r
o
j
e
c
t
s
\
C
i
t
y

o
f

V
i
s
t
a
\
T
i
d
e
l
i
n
e

P
h
e
a
s
a
n
t

H
i
l
l
\
M
a
p

D
o
c
s
\
B
i
o
\
B
i
o
L
e
t
t
e
r
\
F
i
g
u
r
e
3 _
U
S
G
S
T
o
p
o
.
m
x
d
Source: USGS Tideline Pheasant Hill Quadrangle 1975.
±01,000500
Feet USGS Topographic Map
Source: USGS Tideline Pheasant Hill Quadrangle 1975.

Figure 3
Tideline Kensho Residential Project10/24/2023 PH1 424 of 2254

O
C
E
A
N
VI
E
W

C
T
TER
R
A
C
E

D
R
GU
A
J
O
M
E

S
T
RA
N
C
H
O

V
I
S
T
A

R
D
E
L

M
I
R
A
S
O
AS
T
R
O

C
T
UNN
A
M
E
D

5 5
T
H

R
D
HILDAL
E

C
R
OCE
A
N

V
I
E
W

D
R
U
N
I
T
Y

W
Y
S

S
A
N
T
A

F
E

A
V
P
I
N
A

L
N
BAN
D
I
N
I

P
L

RANCHO V
I
S
T
A

P
L
PETE
R
S

D
R

MERCANTILE ST

LADO DE L
O
M
A

D
R
ED
D
I
E

D
R
R
H
O
D
A

L
N
ÄÆ78
Project Site
Off-Site Improvements
Survey Area
Soils
Fallbrook Sandy Loam
Fallbrook-Vista Sandy Loams
Salinas Clay Loam
Da
t
e
:

1 /
2 4
/
2 0
2 3

-

L
a
s
t

s
a
v
e
d

b
y
:

R
a
n
d
y
.

D
e
o
d
a
t

-

P
a
t
h
:

C
:
\
G
I
S
\
P
r
o
j
e
c
t
s
\
C
i
t
y

o
f

V
i
s
t
a
\
T
i
d
e
l
i
n
e

P
h
e
a
s
a
n
t

H
i
l
l
\
M
a
p

D
o
c
s
\
B
i
o
\
B
i
o
L
e
t
t
e
r
\
F
i
g
u
r
e
4 _
S
o
i
l
s
.
m
x
d
Source: USDA 1973; SanGIS Imagery 2017.
±0300150
Feet Soils
Source: USDA 1973; SanGIS Imagery 2017.

Figure 4
Tideline Kensho Residential Project10/24/2023 PH1 425 of 2254

W
A
V
E
D
R
GU
A
J
O
M
E

S
T
TERRAC
E

D
R
RA
N
C
H
O

V
I
S
T
A

R
D
S

I
N
D
I
A
N
A

A
V
O
C
E
A
N

V
I
E
W

C
T
AS
T
R
O

C
T
UNN
A
M
E
D

5 5
T
H

R
D
E BRO
A
D
W
A
Y
EU
C
A
L
Y
P
T
U
S

A
V
U
N
I
T
Y

W
Y

HILDALE

C
R
ALLE
Y
S
S
A
N
T
A

F
E

A
V
P
I
N
A

L
N
PU
B
L
I
C

R
D
R
H
O
D
A

L
N
OCE
A
N

V
I
E
W

D
R
MA
I
N

S
T
PA
R
K

A
V
PETE
R
S

D
R
M
E
R
C
A
N
T
I
L
E

S
T
ED
D
I
E

D
R

LADO DE L
O
M
A

D
R
Project Site
Off-Site Improvements
Survey Area
Riverine Feature
Da
t
e
:

1 /
2 4
/
2 0
2 3

-

L
a
s
t

s
a
v
e
d

b
y
:

R
a
n
d
y
.

D
e
o
d
a
t

-

P
a
t
h
:

C
:
\
G
I
S
\
P
r
o
j
e
c
t
s
\
C
i
t
y

o
f

V
i
s
t
a
\
T
i
d
e
l
i
n
e

P
h
e
a
s
a
n
t

H
i
l
l
\
M
a
p

D
o
c
s
\
B
i
o
\
B
i
o
L
e
t
t
e
r
\
F
i
g
u
r
e
5 _
N
W
I
.
m
x
d
Source: USFWS 2021; SanGIS Imagery 2017.
±0300150
Feet National Wetlands Inventory Results
Source: USFWS 2021; SanGIS Imagery 2017.

Figure 5
Tideline Kensho Residential Project10/24/2023 PH1 426 of 2254

Da
t
e
:

1 /
2 4
/
2 0
2 3

-

L
a
s
t

s
a
v
e
d

b
y
:

R
a
n
d
y
.

D
e
o
d
a
t

-

P
a
t
h
:

C
:
\
G
I
S
\
P
r
o
j
e
c
t
s
\
C
i
t
y

o
f

V
i
s
t
a
\
T
i
d
e
l
i
n
e

P
h
e
a
s
a
n
t

H
i
l
l
\
M
a
p

D
o
c
s
\
B
i
o
\
B
i
o
L
e
t
t
e
r
\
F
i
g
u
r
e
6 _
V
e
g
e
t
a
t
i
o
n
C
o
m
m
u
n
i
t
i
e
s
.
m
x
d
O
C
E
A
N
VI
E
W

C
T
TER
R
A
C
E

D
R
GU
A
J
O
M
E

S
T
RA
N
C
H
O

V
I
S
T
A

R
D
E
L

M
I
R
A
S
O
AS
T
R
O

C
T
UNN
A
M
E
D

5 5
T
H

R
D
HILDAL
E

C
R
OCE
A
N

V
I
E
W

D
R
U
N
I
T
Y

W
Y
S

S
A
N
T
A

F
E

A
V
P
I
N
A

L
N
R
H
O
D
A

L
N
BAN
D
I
N
I

P
L

RANCHO V
I
S
T
A

P
L
PETE
R
S

D
R
M
E
R
C
A
N
T
I
L
E

S
T

LADO DE
L
O
M
A

D
R
ED
D
I
E

D
R
Tideline Kensho Residential Project
Project Site
Survey Area
Off-Site Improvements
Vegetation Communities and
Land Cover Types
Coast Live Oak Woodland
Urban/Developed
Disturbed Habitat
Non-Native Grassland
Non-Vegetated Channel
Vegetation Communities and Land Cover Types
Source: Maxar Imagery 2021.

Figure 6±0300150
Feet10/24/2023 PH1 427 of 2254

!
!
")
Channel 1
Channel 2
Channel 3
R
H
O
D
A

L
N
NW-1-1
NW-1-2
NW-1-3
NW-1-4
NW-2-1
NW-2-2
NW-3-1

33.195 ,-117.239

33.196 ,-117.241
Project Site
Off-Site Improvements
Survey Area
Non-Wetland Sampling Points
!Reference Points
")Culvert
Non-Wetland Waters
Channel 1 (0.015 acre) (309 ft)
Channel 2 (0.003 acre) (43 ft)
Channel 3 (0.02 acre) (881 ft)
Da
t
e
:

1 /
2 4
/
2 0
2 3

-

L
a
s
t

s
a
v
e
d

b
y
:

R
a
n
d
y
.

D
e
o
d
a
t

-

P
a
t
h
:

C
:
\
G
I
S
\
P
r
o
j
e
c
t
s
\
C
i
t
y

o
f

V
i
s
t
a
\
T
i
d
e
l
i
n
e

P
h
e
a
s
a
n
t

H
i
l
l
\
M
a
p

D
o
c
s
\
B
i
o
\
B
i
o
L
e
t
t
e
r
\
F
i
g
u
r
e
7 _
A
q
u
a
t
i
c
R
e
s
o
u
r
c
e
s
.
m
x
d
Source: Latitude 33 2019; Maxar Imagery 2021.
±010050
Feet Aquatic Resources
Source: Latitude 33 2019; Maxar Imagery 2021.

Figure 7
Tideline Kensho Residential Project10/24/2023 PH1 428 of 2254

Da
t
e
:

1 /
2 4
/
2 0
2 3

-

L
a
s
t

s
a
v
e
d

b
y
:

R
a
n
d
y
.

D
e
o
d
a
t

-

P
a
t
h
:

C
:
\
G
I
S
\
P
r
o
j
e
c
t
s
\
C
i
t
y

o
f

V
i
s
t
a
\
T
i
d
e
l
i
n
e

P
h
e
a
s
a
n
t

H
i
l
l
\
M
a
p

D
o
c
s
\
B
i
o
\
B
i
o
L
e
t
t
e
r
\
F
i
g
u
r
e
8 _
W
i
l
d
l
i
f
e
O
c
c
u
r
e
n
c
e
s
.
m
x
d
!(
!(
!(
!(
!(
O
C
E
A
N
VI
E
W

C
T
TER
R
A
C
E

D
R
GU
A
J
O
M
E

S
T
RA
N
C
H
O

V
I
S
T
A

R
D
E
L

M
I
R
A
S
O
AS
T
R
O

C
T
UNN
A
M
E
D

5 5
T
H

R
D
HILDAL
E

C
R
OCE
A
N

V
I
E
W

D
R
U
N
I
T
Y

W
Y
S

S
A
N
T
A

F
E

A
V
P
I
N
A

L
N
R
H
O
D
A

L
N
BAN
D
I
N
I

P
L

RANCHO V
I
S
T
A

P
L
PETE
R
S

D
R
M
E
R
C
A
N
T
I
L
E

S
T

LADO DE
L
O
M
A

D
R
ED
D
I
E

D
R
Tideline Kensho Residential Project
Project Site
Off-Site Improvements
Survey Area
Sensitive Wildlife
Species Observed
!(Great Blue Heron
!(Monarch Butterfly
!(Southern Mule Deer
!(Red-Shouldered Hawk
Sensitive Wildlife Species Observations
Source: Maxar Imagery 2021.

Figure 8±0300150
Feet10/24/2023 PH1 429 of 2254

Da
t
e
:

1 /
2 4
/
2 0
2 3

-

L
a
s
t

s
a
v
e
d

b
y
:

R
a
n
d
y
.

D
e
o
d
a
t

-

P
a
t
h
:

C
:
\
G
I
S
\
P
r
o
j
e
c
t
s
\
C
i
t
y

o
f

V
i
s
t
a
\
T
i
d
e
l
i
n
e

P
h
e
a
s
a
n
t

H
i
l
l
\
M
a
p

D
o
c
s
\
B
i
o
\
B
i
o
L
e
t
t
e
r
\
F
i
g
u
r
e
9 _
P
l
a
n
t
_
W
i
l
d
l
i
f
e
_
P
T
O
.
m
x
d
$1$1$1
$1
ddd
")
$1$1$1$1
$1
")
XW #0
d$1
#0
Tideline Kensho Residential Project
Project Site
Off-Site Improvements
Survey Area
1-Mile Buffer
Plant Species
#0 Thread-Leaved Brodiaea
#0 Wart-Stemmed Ceanothus
Bird Species
XW California Black Rail
Invertebrates Species
")Quino Checkerspot Butterfly
Mammal Species
$1 Northwestern San Diego Pocket Mouse
$1 Stephens' Kangaroo Rat
$1 Western Yellow Bat
$1 Yuma Myotis
Reptile Species
d Blainville's Horned Lizard
d Two-striped Garter Snake
d San Diego Ringneck Snake
Plant and Wildlife Species with Potential to Occur
Source: SanGIS Imagery 2017.

Figure 9±02,0001,000
Feet10/24/2023 PH1 430 of 2254

Da
t
e
:

1 /
2 4
/
2 0
2 3

-

L
a
s
t

s
a
v
e
d

b
y
:

R
a
n
d
y
.

D
e
o
d
a
t

-

P
a
t
h
:

C
:
\
G
I
S
\
P
r
o
j
e
c
t
s
\
C
i
t
y

o
f

V
i
s
t
a
\
T
i
d
e
l
i
n
e

P
h
e
a
s
a
n
t

H
i
l
l
\
M
a
p

D
o
c
s
\
B
i
o
\
B
i
o
L
e
t
t
e
r
\
F
i
g
u
r
e
1 0
_
C
r
i
t
i
c
a
l
H
a
b
i
t
a
t
.
m
x
d
S
H
A
D
O
W
R
I
D
G
E

D
R
N

M
E
L
R
O
S
E

D
R

MONTE VISTA DRS

M
E
L
R
O
S
E

D
R
BU
E
N
A

C
R
E
E
K

R
D
SU
N
S
E
T

D
R
C
I
V
I
C

C
E
N
T
E
R

D
R
B
U
E
N
A

V
I
S
T
A

D
R

FOOTHILL DR

OLIVE AV
N
S
A
N
T
A

F
E

A
V
CY
P
R
E
S
S

D
R

VALE TERRACE DR
ÄÆ78
Tideline Kensho Residential Project
Project Site
Survey Area
Off-Site Improvements
Coastal California Gnatcatcher Critical Habitat
Thread-leaved Brodiaea Critical Habitat
Critical Habitat
Source: USFWS 2007, 2011; SanGIS Imagery 2017.

Figure 10±03,0001,500
Feet10/24/2023 PH1 431 of 2254

Da
t
e
:

1 /
2 4
/
2 0
2 3

-

L
a
s
t

s
a
v
e
d

b
y
:

R
a
n
d
y
.

D
e
o
d
a
t

-

P
a
t
h
:

C
:
\
G
I
S
\
P
r
o
j
e
c
t
s
\
C
i
t
y

o
f

V
i
s
t
a
\
T
i
d
e
l
i
n
e

P
h
e
a
s
a
n
t

H
i
l
l
\
M
a
p

D
o
c
s
\
B
i
o
\
B
i
o
L
e
t
t
e
r
\
F
i
g
u
r
e
1 1
_
B
i
o
l
o
g
i
c
a
l
R
e
s
o
u
r
c
e
s
I
m
p
a
c
t
s
.
m
x
d
O
C
E
A
N
VI
E
W

C
T
TER
R
A
C
E

D
R
GU
A
J
O
M
E

S
T
RA
N
C
H
O

V
I
S
T
A

R
D
E
L

M
I
R
A
S
O
AS
T
R
O

C
T
UNN
A
M
E
D

5 5
T
H

R
D
HILDAL
E

C
R
OCE
A
N

V
I
E
W

D
R
U
N
I
T
Y

W
Y
S

S
A
N
T
A

F
E

A
V
P
I
N
A

L
N
R
H
O
D
A

L
N
BAN
D
I
N
I

P
L

RANCHO V
I
S
T
A

P
L
PETE
R
S

D
R
M
E
R
C
A
N
T
I
L
E

S
T

LADO DE
L
O
M
A

D
R
ED
D
I
E

D
R
Tideline Kensho Residential Project
Project Site
Off-Site Improvements
Permanent Impacts
Survey Area
Vegetation Communities and
Land Cover Types
Coast Live Oak Woodland
Urban/Developed
Disturbed Habitat
Non-Native Grassland
Non-Vegetated Channel
Biological Resources Impacts
Source: Maxar Imagery 2021.

Figure 11±0300150
Feet10/24/2023 PH1 432 of 2254

This page intentionally left blank.

10/24/2023 PH1 433 of 2254

Attachment 2. Aquatic Resources Delineation Report

10/24/2023 PH1 434 of 2254

This page intentionally left blank.

10/24/2023 PH1 435 of 2254

DRAFT
Aquatic Resources
Delineation Report
Tideline Kensho Residential Project
April 2023
Prepared for:

Tideline Partners
2148 Jimmy Durante Boulevard, Suite B
Del Mar, California 92014
Contact: Lev Gershman, Managing Partner
Prepared by:

600 B Street, Suite 2000
San Diego, California 92101
(619) 510-5372
Contact: Emily Mastrelli, Principal Biologist

10/24/2023 PH1 436 of 2254

This page intentionally left blank.

10/24/2023 PH1 437 of 2254

Aquatic Resources Delineation Report i April 2023
Tideline Kensho Residential Project
Table of Contents
Acronyms and Abbreviations ................................................................................................. iii Section A Site Description, Landscape Setting ................................................................... 1 A.1 Project Location ............................................................................................. 1 A.2 Project Description ......................................................................................... 1 A.2.1 Project Drainage Design ..................................................................... 2 A.3 Landscape Setting ......................................................................................... 2 A.4 Project Site Access ........................................................................................ 3 Section B Site Alterations, Current, and Past Land Use ..................................................... 5 B.1 Soils ............................................................................................................... 5 B.2 Hydrology ....................................................................................................... 5 B.3 Vegetation ...................................................................................................... 6 B.3.1 Non-Vegetated Channel (64200) ........................................................ 6 B.3.2 Coast Live Oak Woodland (71160) ..................................................... 7 Section C Precipitation Data and Analysis ........................................................................... 9 C.1 Climate and Growing Season ......................................................................... 9 C.2 Antecedent Precipitation Tool and NRCS WETS Table Results Summary ..... 9 C.3 Wetland Hydrology and Analysis .................................................................... 9 Section D Methods ............................................................................................................... 11 D.1 Pre-Field Review .......................................................................................... 11 D.2 On-Site Aquatic Resources Delineation ....................................................... 11 D.3 On-Site Ordinary High Water Mark Investigation .......................................... 13 D.4 Streamflow Duration Assessment ................................................................ 13 Section E Aquatic Resources Descriptions ....................................................................... 15 E.1 Non-Wetland Waters .................................................................................... 15 E.1.1 Channel 1 ......................................................................................... 15 E.1.2 Channel 2 ......................................................................................... 17 E.1.3 Channel 3 ......................................................................................... 18 Section F Deviation from Local Wetlands Inventory or National Wetlands Inventory .... 19 Section G Mapping Method ................................................................................................. 21 Section H Conclusions ........................................................................................................ 23 Section I Preliminary Jurisdictional Determinations........................................................ 25 Section J Disclaimer Statement ......................................................................................... 27 Section K References .......................................................................................................... 29 10/24/2023 PH1 438 of 2254

Aquatic Resources Delineation Report ii April 2023
Tideline Kensho Residential Project
Tables
Table 1. Tideline Kensho Residential Project Features ............................................................... 2 Table 2. Non-Wetland Waters ................................................................................................... 15 Table 3. Summary of Non-Wetland Waters ............................................................................... 23 Table 4. Preliminary Jurisdiction of Aquatic Resources ............................................................. 25 Attachments
Attachment A. Figures
Attachment B. Statement of Access
Attachment C. Antecedent Precipitation Tool and NRCS WETS Table Results Attachment D. Arid West Wetland Determination and Ordinary High Water Mark Datasheets Attachment E. Photographic Log
Attachment F. SDAM for the Arid West Forms
Attachment G. Geographic Information Systems Data
Attachment H. Aquatic Resources Table

10/24/2023 PH1 439 of 2254

Aquatic Resources Delineation Report iii April 2023
Tideline Kensho Residential Project
Acronyms and Abbreviations
°F degrees Fahrenheit
CDFW California Department of Fish and Wildlife
Harris Harris & Associates
NHD National Hydrography Data
NRCS National Resources Conservation Service
NWI National Wetlands Inventory
OHWM ordinary high water mark
Project Tideline Kensho Residential Project
RV recreational vehicle
RWQCB Regional Water Quality Control Board
SDAM Streamflow Duration Assessment Method
USACE U.S. Army Corps of Engineers
USGS U.S. Geological Survey

10/24/2023 PH1 440 of 2254

Aquatic Resources Delineation Report iv April 2023
Tideline Kensho Residential Project

This page intentionally left blank.

10/24/2023 PH1 441 of 2254

Aquatic Resources Delineation Report 1 April 2023
Tideline Kensho Residential Project
Section A Site Description, Landscape Setting
A.1 Project Location
Tideline Partners (applicant and property owner) is proposing the Tideline Kensho Residential Project (Project) on approximately five acres in the City of Vista, California (Attachment A, Figures; Figure 1, Regional Location, and Figure 2, Project Site). The Project site is along the eastern side of Lado De Loma Drive (Assessor’s Parcel Numbers 179-093-05, -09, -18, -23, -30, -32, and -34) and is in the 7.5-Minute San Marcus Quadrangle, Township 11 South, Range 3 West, Section 32 (Figure 3, USGS Topographic Map). The aquatic resources delineation was conducted on the Project site, in the off-site improvements area, and within a 20-foot survey buffer, herein referred to as the “survey area.” The Project site is bordered by a single-family residential neighborhood from the northwest to the southeast, while the SPRINTER light-rail line borders the remaining sides of the Project. On the other side of the SPRINTER tracks is commercial development. The majority of the Project site is undeveloped open space, with a single-family residence in the northern portion of the Project site, a second single-family residence and a recreational vehicle (RV) trailer in the southern portion of the Project site, and a dirt road (Rhoda Lane) running along the eastern side of the site parallel to the SPRINTER tracks (Figure 2). Rhoda Lane provides access to the single-family residences and RV trailer in the northern and southern portions of the Project site. The off-site improvements area (the area in which off-site sidewalk improvements are proposed as part of the Project) occurs in the Guajome Street roadway and is defined as urban/developed land.

A.2 Project Description
The Project proposes a new residential development that would result in the construction of 183 dwelling units, including three three-story buildings and one four-story building with covered parking included in three of the four buildings. The Project also proposes off-site sidewalk improvements along the northern side of Lado De Loma Drive and Guajome Street from Eddie Drive to the northern and western sides of the Project site (i.e., the off-site improvements area).

The Project would then require an increase in density on the Project site, as it is currently designated as Medium Density Residential (MD) with a maximum of ten dwelling units per acre.

The site would be rezoned out of the Pheasant Hill Specific Plan and into the Downtown Vista Specific Plan and would also include a General Plan amendment, a zoning change, a Site Development Plan, and a Tentative Parcel Map. The Project proposes a variety of Project development features, as shown in Table 1, Tideline Kensho Residential Project Features. A description of the individual features is provided below. 10/24/2023 PH1 442 of 2254

Aquatic Resources Delineation Report 2 April 2023
Tideline Kensho Residential Project
Table 1. Tideline Kensho Residential Project Features
Project Development Feature Square Footage (sf) Percent Coverage (%) Total Lot Size 199,831 100
Apartment Units (Buildings 1–4)
Multi-Family Residential Buildings including amenity space: Bicycle storage, pool house, pool/spa, gym, rooftop terrace, and common usable areas
52,468 26.25
Parking Areas: 266 total parking spaces
Residential: 218 spaces
Accessory (Staff/Visitor): 47 spaces
USPS: 1 space
43,653 21.85
Landscape areas (including slopes and some open space areas including community gathering space and gardens)
103,710 51.90
Sources: Safdie Rabines Architects 2022.

A.2.1 Project Drainage Design
The Project would include water- and energy-efficient design features designed for conservation, such as biofiltration basins. A total of seven on-site biofiltration basins would treat stormwater runoff. The biofiltration basins would be throughout the Project site. After construction, stormwater would be conveyed through gutters and storm drains to the on-site biofiltration facilities. The site would continue to discharge runoff into the City’s existing storm drain system in South Santa Fe Avenue, eventually flowing to Buena Vista Creek.

A.3 Landscape Setting
The Project site is in a portion of the City containing both residential and commercial development.

It is surrounded by single-family residential neighborhoods to the north, west, and south (across Lado De Loma Drive); commercial development to the northeast (across Guajome Street); and the SPRINTER tracks to the east (Figure 2). Vegetation communities and land cover types on the Project site, in the off-site improvements area, and in the survey area include non-native grassland, coast live oak woodland, disturbed habitat, and urban/developed land, with three non-vegetated channels (Channels 1 through 3). Channels 1 and 2 are earthen-bottom channels that extend west to east through the center of the Project site. Channel 3 is a concrete-lined channel that extends northwest to southeast along the eastern edge of the survey area within the SPRINTER transit right-of-way.

The off-site improvements area occurs in the Lado De Loma Drive and Guajome Street roadways and is defined primarily as urban/developed land. The majority of the Project site is undeveloped, and the entire property has historically been disturbed with mowing and other mechanical disturbances, including repeated motor vehicle use through the center of the Project site, which has created a two-track trail with well-formed tire ruts. Rhoda Lane, the dirt access road on the eastern side of the Project site, is also frequently used by local residents. One single-family residence exists in the northern portion of the Project site, and a second single-family residence and an RV trailer 10/24/2023 PH1 443 of 2254

Aquatic Resources Delineation Report 3 April 2023
Tideline Kensho Residential Project
exist in the southern portion of the Project site. The two single-family residences and RV trailer constitute the urban/developed land on the Project site.

The survey area is characterized by the gently sloping hill on the Project site and the relatively flat areas along the off-site improvements area. The slope on the Project site is situated with the western half of the Project site higher in elevation and decreasing in elevation moving east across the Project site. Elevation ranges from approximately 108 feet to 129 feet above mean sea level.

The topographic lines on Figure 3, USGS Topographic Map, represent the Project elevations. The off-site improvements area to the east along Guajome Drive sits lower in elevation and raises as it heads west along Lado De Loma Drive to Eddie Drive, with a slight decrease in elevation after Rancho Vista Road.

A.4 Project Site Access
The property owner, Tideline Partners, has granted U.S. Army Corps of Engineers (USACE) personnel access to the Project site, as documented in Attachment B, Statement of Access.

10/24/2023 PH1 444 of 2254

Aquatic Resources Delineation Report 4 April 2023
Tideline Kensho Residential Project

This page intentionally left blank.

10/24/2023 PH1 445 of 2254

Aquatic Resources Delineation Report 5 April 2023
Tideline Kensho Residential Project
Section B Site Alterations, Current, and Past Land Use
Based on historical aerial images dating back to 1938, the unnamed earthen-bottom channels (Channels 1 and 2) did not form in the central portion of the Project site until around 1986 when use of the Project site as an agricultural field ended (Historic Aerials 2023). The stormwater pipe under Lado De Loma Drive was installed sometime after 1986 to direct urban stormwater discharges from the residential developments to the west onto the Project site. It is likely that the periodic stormwater discharges over the past 36 years formed the unnamed channels through erosion. In addition, there is evidence that more recent (since 2010) mechanical earthmoving and motor vehicle use throughout the Project site have altered the flow paths of the channels. Channel 2 may have been a historical stormwater flow path connected to Channel 1 but has been disturbed by mechanical earthmoving and motor vehicles and no longer appears to receive stormwater.

Based on historical arial images dating back to 1938, Channel 3, a concrete-lined channel that occurs within the SPRINTER transit right-of-way, appears to have been constructed between 1953 and 1964 to capture and direct stormwater flows away from the SPRINTER rail line (Historic Aerials 2023).

B.1 Soils
The Project site, off-site improvements area, and survey area are underlain by three soil types:

Fallbrook sandy loam, Fallbrook-Vista sandy loam, and Salinas clay loam. These soil units are presented on Figure 4, Soils. Fallbrook sandy loam (nine to 15 percent slopes) occurs across the majority of the Project site, off-site improvements area, and survey area. Fallbrook-Vista sandy loam (nine to 15 percent slopes) occurs on the western edge of the Project site and survey area and in the southwestern and central portions of the off-site improvements area. Salinas clay loam (zero to two percent slopes) occurs in small areas along the northeastern and southeastern edges of the Project site and survey area and at the eastern end of the off-site improvements area. None of these soils are defined as hydric (wetland) soils (USDA 2019).

B.2 Hydrology
The Project site is in the Carlsbad Watershed (Hydrologic Unit 904) (Project Clean Water 2023).

The Carlsbad Watershed encompasses a land area of 211 square miles. It lies in the northern portion of San Diego County and neighbors the San Luis Rey Watershed to the north and the San Dieguito Watershed to the south.

The National Wetlands Inventory (NWI) and USGS National Hydrography Data (NHD) mapping results did not identify aquatic features on the Project site, in the off-site improvements area, or in the survey area (Figure 5, National Wetlands Inventory Results). The non-vegetated earthen-bottom Channels 1 and 2 observed in the center of the Project site and the concrete-lined Channel 3 observed along the eastern edge of the survey area during the aquatic resources 10/24/2023 PH1 446 of 2254

Aquatic Resources Delineation Report 6 April 2023
Tideline Kensho Residential Project
delineation fieldwork were not identified on the NWI or NHD mapping results for the Project site, off-site improvements area, and survey area (USFWS 2023; USGS 2023). Channels 1 through 3 are discussed in detail in Section E, Aquatic Resources Descriptions. No other aquatic resources were identified in the NWI or NHD mapping results or observed on the Project site, in the off-site improvements area, or in the survey area.

Buena Vista Creek, which flows directly into Buena Vista Lagoon, a traditional navigable water as defined by the USACE, is approximately 0.5 mile north of Channels 1 through 3. Based on a review of the NWI and NHD results, Channels 1 through 3 are not documented as aquatic resources and do not connect to Buena Vista Creek or any other documented aquatic resource via surface water flow (USGS 2023; USACE 2023a). However, Channel 3 may have a downstream connection to Buena Vista Creek through the municipal stormwater system. Channels 1 through 3 are discussed in detail in Section E.

Drainage patterns on the Project site show evidence of alteration with on-site mechanical disturbances associated with the residential developments in the southern portion of the Project site and bordering the Project site to the north, west, and south. Channels 1 and 2 appear to have formed as a result of erosion from stormwater flows directed onto the Project site through a corrugated metal stormwater pipe on the western edge of the Project site. In addition to historical and recent disturbance of Channels 1 and 2 and across the Project site, the drainage patterns in and connected to the channels in the central portion of the Project site do not appear to be natural and are likely a result of urban stormwater management. Similarly, Channel 3 is an artificial, concrete-lined channel that was constructed to capture and direct stormwater flows away from the SPRINTER transit right-of-way.

B.3 Vegetation
Five vegetation communities and land cover types were observed on the Project site, in the off-site improvements area, and in the survey area. These include non-vegetated channel, non-native grassland, coast live oak woodland, disturbed habitat, and urban/developed land (Oberbauer et al. 2008). Figure 6, Vegetation Communities and Land Cover Types, presents the vegetation community and land cover type boundaries. The vegetation communities associated with aquatic resources on the Project site, in the off-site improvements area, and in the survey area, non- vegetated channel and coast live oak woodland, are described in the following subsections.

B.3.1 Non-Vegetated Channel (64200)
Non-vegetated channel consists of predominantly sandy, gravelly, or rocky channels lacking or with reduced vegetation. Variable water lines inhibit the growth of vegetation, although some weedy species of grasses may grow along the outer edges of the channel. Vegetation may exist here but is usually less than ten percent of the total cover (Oberbauer et al. 2008). 10/24/2023 PH1 447 of 2254

Aquatic Resources Delineation Report 7 April 2023
Tideline Kensho Residential Project
Approximately 0.04 acre of non-vegetated channel (Channels 1 through 3) occurs through the central portion of the Project site and along the eastern edge of the survey area (Figure 6). Channels 1 and 2 are earthen-bottom channels, and Channel 3 is a concrete-lined channel.

Channel 1 is approximately 0.016 acre and begins on the western edge of the Project site at the discharge point of an approximately two-foot-diameter corrugated metal stormwater culvert. From this point, Channel 1 extends approximately 309 linear feet east where it becomes undefined in a dirt road (Rhoda Lane) that runs along the eastern side of the Project site. The stormwater culvert from which Channel 1 forms occurs in the off-site improvements area along the western side of the Project site.

Channel 2 is approximately 0.003 acre and begins in the disturbed uplands in the central portion of the Project site and extends approximately 43 linear feet east where the channel becomes undefined. Channel 2 might have been a historical stormwater flow path connected to Channel 1 but has been disturbed by mechanical earthmoving or vehicles and no longer appears to receive stormwater.

Channel 3 is approximately 0.02 acre and occurs along the eastern edge of the survey area, outside the Project site, within the SPRINTER transit right-of-way (Figure 6). Channel 3 enters the southeastern corner of the survey area and extends approximately 893 linear feet northwest where it ends in a disturbed upland area south of Guajome Street. Channel 3 is connected to a larger concrete channel to the east that is directed through a stormwater culvert under Guajome Street. Channel 3 occurs in disturbed habitat, urban/developed land, and non-native grassland.

Channels 1 through 3 are discussed in detail in Section E.

B.3.2 Coast Live Oak Woodland (71160)
Coast live oak woodland is dominated by coast live oak (Quercus agrifolia) with a poorly developed shrub layer that can include toyon (Heteromeles arbutifolia), gooseberry (Ribes spp.), and laurel sumac (Malosma laurina) or is dominated by black elderberry (Sambucus nigra) (Oberbauer et al. 2008). The herb layer of coast live oak woodland is continuous and dominated by ripgut brome and several other introduced grasses.

Approximately 0.26 acre of coast live oak woodland occurs in the central and western portions of the Project site, and approximately 0.05 acre of coast live oak woodland occurs along the southwestern edge of the off-site improvements area, for a total of 0.31 acre (Figure 6). The coast live oak woodland is dominated by interior coast live oak (Quercus agrifolia var. oxyadenia) with disturbed open areas, non-native grasses, and weeds in the understory.

10/24/2023 PH1 448 of 2254

Aquatic Resources Delineation Report 8 April 2023
Tideline Kensho Residential Project

This page intentionally left blank.

10/24/2023 PH1 449 of 2254

Aquatic Resources Delineation Report 9 April 2023
Tideline Kensho Residential Project
Section C Precipitation Data and Analysis
C.1 Climate and Growing Season
On a regional level, San Diego County has a Mediterranean climate, which is characterized by wet winters and dry summers. This is largely because of a semi-permanent high-pressure zone that sits over the Pacific Ocean during much of the year and forms a fog belt (marine layer). The Project site is generally within the Peninsular Ranges of Southern California. Generalized climate in the region is regarded as dry, subhumid mesothermal, with warm dry summers and cold moist winters, which pushes the growing season to the wet months of the year (late winter to early spring). The rainy season in San Diego County typically lasts from October through March. Summer months include June through September. Vegetation often goes dormant (senescent) during the later summer months until initial rains start in the fall.

The closest weather station to the Project site is the Vista National Oceanic and Atmospheric Administration weather station (EW3055) approximately three miles northwest of the Project site (NOAA 2023). Between 2002 and 2022, the average maximum temperature was 74 degrees Fahrenheit (°F), and the average minimum temperature was 52°F. The annual precipitation between 2002 and 2022 was approximately 12.94 inches. In 2022, the total rainfall was 8.07 inches, approximately 4.47 inches less than the previous year (NRCS 2023).

C.2 Antecedent Precipitation Tool and NRCS WETS Table Results Summary
A typical rainfall year in San Diego County has historically been 11 inches of annual precipitation.

To calculate whether the aquatic resources delineation fell into a wet, dry, or typical rainfall year, a Harris & Associates (Harris) aquatic resources specialist used the Antecedent Precipitation Tool Version 1.0.19 (USACE 2023b). The Antecedent Precipitation Tool results determined that the initial aquatic resources delineation was conducted in wetter than normal conditions for precipitation in the dry season during an extreme drought (see Attachment C, Antecedent Precipitation Tool and NRCS WETS Table Results).

The National Resources Conservation Service (NRCS) Wetland Climate Table for 2002–2022 at Vista, California, is in Attachment C. The average annual precipitation over the last 20 years was approximately 12.94 inches (NRCS 2023).

C.3 Wetland Hydrology and Analysis
A Harris aquatic resources specialist reviewed historical and current aerial imagery, topographic maps, and NWI maps. The NWI mapping results did not identify aquatic features on the Project site, in the off-site improvements area, or in the survey area (Figure 5). The two non-vegetated channels (Channels 1 and 2) observed in the center of the Project site and concrete-lined Channel 3 observed along the eastern edge of the survey area during the aquatic resources delineation survey 10/24/2023 PH1 450 of 2254

Aquatic Resources Delineation Report 10 April 2023
Tideline Kensho Residential Project
were not identified on the NWI mapping results. Channels 1 through 3 are discussed in detail in Section E. No other aquatic resources were identified in the NWI mapping results or observed on the Project site, in the off-site improvements area, or in the survey area during the aquatic resources delineation fieldwork conducted on July 20, 2021, and January 19, 2023.

10/24/2023 PH1 451 of 2254

Aquatic Resources Delineation Report 11 April 2023
Tideline Kensho Residential Project
Section D Methods
D.1 Pre-Field Review
Before conducting fieldwork, a Harris aquatic resources specialist referenced the following materials:
x Topographic maps
x Aerial imagery (Google Earth from 1994–2021)
x Historical aerial imagery (Historic Aerials 2023)
x U.S. Fish and Wildlife Service NWI Wetlands Mapper (USFWS 2023) x U.S. Department of Agriculture Natural Resources Conservation Service Web Soil Survey for the Project site, which lists hydric soils found in San Diego County (USDA 2019) D.2 On-Site Aquatic Resources Delineation
The aquatic resources delineation was conducted using the routine on-site determination method described in the Corps of Engineers Wetlands Delineation Manual (USACE 1987) and the Regional Supplement to the Corps of Engineers Wetlands Delineation Manual: Arid West Region (USACE 2008a). A Harris aquatic resources specialist conducted the initial aquatic resources delineation fieldwork on July 20, 2021, with a follow-up survey conducted on January 19, 2023, to identify aquatic resources on the Project site, in the off-site improvements area, and in the survey area. An Arid West region ordinary high water mark (OHWM) datasheet was completed for each unique aquatic feature observed (Attachment D, Arid West Wetland Determination and Ordinary High Water Mark Datasheets).

Sampling points were taken in each of the unique aquatic resource features. Figure 7, Aquatic Resources for Tideline Kensho Residential Project, shows the sampling points associated with the on-site aquatic resources. Figure 7 was created in adherence with the Updated Map and Drawing Standards for the South Pacific Division Regulatory Program and can be referenced in Attachment A (USACE 2016). Representative photographs of the aquatic resources are provided in Attachment E, Photographic Log. The delineation methods conducted at each of the sampling points are described in detail below.

Sampling Point NW-1-1 was taken in the center of Channel 1 on the western edge of the Project site where an OHWM was observed to determine the extent of the non-wetland feature (Figure 7; Photographs 1 and 2). Sampling Point NW-1-1 was taken where Channel 1 forms out of an approximately two-foot-diameter corrugated metal pipe that directs stormwater flows under Lado De Loma Drive from the west onto the Project site. Because an OHWM was observed at Sampling Point NW-1-1, an Arid West region OHWM datasheet was completed. The delineation results for Sampling Point NW-1-1 are presented in Section E.
10/24/2023 PH1 452 of 2254

Aquatic Resources Delineation Report 12 April 2023
Tideline Kensho Residential Project
Sampling Point NW-1-2 was taken in the center of Channel 1 in the western portion of the Project site where the OHWM increased in width and depth and there was an apparent change in sediment texture compared to Sampling Point NW-1-1 (Figure 7; Photograph 3). Because an OHWM was observed at Sampling Point NW-1-2, an Arid West region OHWM datasheet was completed. The delineation results for Sampling Point NW-1-2 are presented in Section E.

Sampling Point NW-1-3 was taken in the center of Channel 1 in the central portion of the Project site where the OHWM decreased in width and depth compared to Sampling Point NW-1-2 (Figure 7; Photograph 4). Because an OHWM was observed at Sampling Point NW-1-3, an Arid West region OHWM datasheet was completed. The delineation results for Sampling Point NW-1-3 are presented in Section E.

Sampling Point NW-1-4 was taken in the center of Channel 1 in the eastern portion of the Project site where the defined channel ends and flows into a dirt road (Rhoda Lane) to determine the extent of the non-wetland feature (Figure 7; Photograph 5). Because an OHWM was observed at Sampling Point NW-1-4, an Arid West region OHWM datasheet was completed. The delineation results for Sampling Point NW-1-4 are presented in Section E.

Sampling Point NW-2-1 was taken in the center of Channel 2 in the central portion of the Project site where the defined Channel 2 forms to determine the extent of the non-wetland feature (Figure 7; Photograph 6). Because an OHWM was observed at Sampling Point NW-2-1, an Arid West region OHWM datasheet was completed. The delineation results for Sampling Point NW-2-1 are presented in Section E.

Sampling Point NW-2-2 was taken in the center of Channel 2 in the eastern portion of the Project site where the defined channel ends and flows into a dirt road (Rhoda Lane) to determine the extent of the non-wetland feature (Figure 7; Photographs 7 and 8). Because an OHWM was observed at Sampling Point NW-2-2, an Arid West region OHWM datasheet was completed. The delineation results for Sampling Point NW-2-2 are presented in Section E.

Sampling Point NW-3-1 was collected in the center of the northern extent of Channel 3 on the eastern edge of the survey area to determine the extent of the non-wetland feature (Figure 7; Photographs 9 through 12). Because an OHWM was observed at Sampling Point NW-3-1, an Arid West region OHWM datasheet was completed. The delineation results for Sampling Point NW-3-1 are presented in Section E.

No hydrophytic vegetation, surface water, or saturated deposited soils were observed in or around earthen-bottom Channels 1 and 2; therefore, no wetland sampling points were taken. The delineation results for Sampling Points NW-1 through NW-1-4, NW-2-1, NW-2-2, and NW-3-1 collected in Channels 1 through 3 are presented in Section E. 10/24/2023 PH1 453 of 2254

Aquatic Resources Delineation Report 13 April 2023
Tideline Kensho Residential Project
D.3 On-Site Ordinary High Water Mark Investigation
The aquatic resources delineation was conducted using the routine on-site determination method described in A Field Guide to the Identification of the Ordinary High Water Mark (OHWM) in the Arid West Region of the Western United States: A Delineation Manual (USACE 2008b). As described in the previous subsection, the majority of the Project site, off-site improvements area, and survey area consist primarily of disturbed habitat and urban/developed land in an urban area.

Following the guidance in A Field Guide to the Identification of the Ordinary High Water Mark (OHWM) in the Arid West Region of the Western United States: A Delineation Manual (USACE 2008b), an aquatic resources specialist collected and recorded data on vegetation, soil, and hydrologic characteristics used as the basis for OHWM determinations. Arid West region OHWM datasheets were completed for the non-wetland Channels 1 and 2 on the Project site and Channel 3 in the survey area (Attachment D). The OHWMs in Channel 1 (Sampling Points NW-1-1 through NW-1-4), Channel 2 (Sampling Points NW-2-1 and NW-2-2), and Channel 3 (Sampling Point NW-3-1) were identified based on field observations of the presence of the OHWM or defined non-wetland water indicators, including changes in sediment texture, vegetation species or cover, break in bank slope, and floodplain contours in the non-wetland aquatic resource feature (USACE 2008b). Results of the OHWM identifications conducted for Sampling Points NW-1 through NW-1-4, NW-2-1, NW-2-2, and NW-3-1 are presented in Section E.

D.4 Streamflow Duration Assessment
The Streamflow Duration Assessment Method (SDAM) for the Arid West was completed for Channels 1 through 3 (USEPA 2023) (Attachment F, SDAM for the Arid West Forms). SDAMs are rapid field assessment methods that use hydrological, geomorphological, and/or biological indicators, observable in a single site visit, to classify streamflow duration as perennial, intermittent, or ephemeral at the reach scale. The SDAM results for Channels 1 through 3 are presented in Section E.

10/24/2023 PH1 454 of 2254

Aquatic Resources Delineation Report 14 April 2023
Tideline Kensho Residential Project

This page intentionally left blank.

10/24/2023 PH1 455 of 2254

Aquatic Resources Delineation Report 15 April 2023
Tideline Kensho Residential Project
Section E Aquatic Resources Descriptions
E.1 Non-Wetland Waters
Channels 1 and 2 observed on the Project site and Channel 3 observed in the survey area were determined to be non-wetland waters. The non-wetland waters observed on the Project site and in the survey area are summarized in Table 2, Non-Wetland Waters, and described in the following subsections.

Table 2. Non-Wetland Waters
Feature Non-Wetland Waters (acres)1 Linear Feet
Channel 1 0.016 309
Channel 2 0.003 43
Channel 3 0.020 893
Total1 0.039 1,245
Notes:
1 Total rounded to one-hundredth of an acre.

The completed Arid West region OHWM datasheets for Channel 1 (Sampling Points NW-1-1 through NW-1-4), Channel 2 (Sampling Points NW-2-1 and NW-2-2), and Channel 3 (Sampling Point NW-3-1) are in Attachment D. Representative photographs of Channels 1 through 3 are provided in Attachment E. Electronic spatial data of the aquatic resources on the Project site and in the survey area is included in Attachment G, Geographic Information Systems Data. The USACE Aquatic Resources Table for the aquatic resources observed on the Project site and in the survey area is provided in Attachment H, Aquatic Resources Table.

E.1.1 Channel 1
Channel 1 begins on the western edge of the Project site at the outfall of an approximately two- foot-diameter corrugated metal pipe and extends approximately 309 linear feet east through the center of the site where it becomes undefined as it disappears into a dirt road (Rhoda Lane) that runs along the eastern side of the Project site. The entire extent of Channel 1 is defined by an OHWM that varies in width between 0.5 foot at its narrowest and three feet at its widest (Figure 7). As discussed in Section D.4, Streamflow Duration Assessment, the SDAM conducted for Channel 1 determined it is an ephemeral feature (Attachment G).

E.1.1.1 Ordinary High Water Mark Analysis
Channel 1 is an approximately 0.016-acre (309 linear feet) non-wetland water that runs through the center of the Project site (Table 2; Figure 7). Figure 7 shows all sampling points (NW-1-1 through NW-1-4) collected in Channel 1, which were within the OHWM of the channel. Attachment E, Photographs 1 through 5, provides representative views of the extent of Channel 1 on the Project site. The OHWM indicators were investigated at Sampling Points NW-1-1 through NW-1-4. The OHWMs documented at Sampling Points NW-1-1 through NW-1-4 are described below. 10/24/2023 PH1 456 of 2254

Aquatic Resources Delineation Report 16 April 2023
Tideline Kensho Residential Project
Sampling Point NW-1-1: The OHWM is approximately two feet wide and 0.5 foot deep (Photographs 1 and 2). The other OHWM indicators observed at Sampling Point NW-1-1 include a change in vegetation species and cover, a break in bank slope, and the presence of a defined bed and bank. Sampling Point NW-1-1 was taken directly east of where the Channel 1 forms at the outlet of the two-foot-diameter corrugated metal pipe on the western edge of the Project site (Photograph 1). The channel at Sampling Point NW-1-1 is highly eroded and has upland grasses and weeds growing in the channel and on the banks. At Sampling Point NW-1-1, Channel 1 is surrounded by coast live oak woodland. Channel 1 is slightly lower in elevation than the surrounding Project site, and the soil at Sampling Point NW-1-1 is sandy loam.

Sampling Point NW-1-2: The OHWM is approximately three feet wide and 0.5 foot deep (Photograph 3). The other OHWM indicators observed at Sampling Point NW-1-2 include a change in vegetation species and cover, a break in bank slope, and the presence of a defined bed and bank. The channel at Sampling Point NW-1-2 is highly eroded and has upland grasses and weeds growing in the channel and on the banks. At Sampling Point NW-1-2, Channel 1 is surrounded by disturbed habitat. Channel 1 is slightly lower in elevation than the surrounding Project site, and the soil at Sampling Point NW-1-2 is sandy loam.

Sampling Point NW-1-3: The OHWM is approximately one foot wide and 0.25 foot deep (Photograph 4). The other OHWM indicators observed at Sampling Point NW-1-3 include a change in average sediment texture, a change in vegetation species and cover, a break in bank slope, and the presence of a defined bed and bank. The channel at Sampling Point NW-1-3 is shallow and has leaf, grass, and weed debris deposited on the edges of the channel and on the banks. At Sampling Point NW-1-3, Channel 1 is surrounded by coast live oak woodland. Channel 1 is at the same elevation as the surrounding Project site, and the soil at Sampling Point NW-1-3 is sandy clay loam.

Sampling Point NW-1-4: The OHWM is approximately 0.5 foot wide and 0.25 foot deep (Photograph 5). The other OHWM indicators observed at Sampling Point NW-1-4 include a change in vegetation species and cover, a break in bank slope, and the presence of a defined bed and bank. Sampling Point NW-1-4 was taken where the defined Channel 1 ends and flows into a dirt road (Rhoda Lane) on the eastern side of the Project site, after which the channel becomes undefined. The channel at Sampling Point NW-1-4 has upland grasses and weeds growing in the channel and on the banks. At Sampling Point NW-1-4, Channel 1 is surrounded by disturbed habitat. Channel 1 is slightly lower in elevation than the surrounding Project site, and the soil at Sampling Point NW-1-4 is sandy clay loam.

No hydrophytic vegetation, surface water, or saturated deposited soils were observed in Channel 1; therefore, no wetland sampling point was taken, and this feature was mapped as a non-wetland water. 10/24/2023 PH1 457 of 2254

Aquatic Resources Delineation Report 17 April 2023
Tideline Kensho Residential Project
E.1.2 Channel 2
Channel 2 begins in the disturbed uplands in the central portion of the Project site and extends approximately 43 linear feet east where it becomes undefined as it meets with the Rhoda Lane dirt road that runs along the eastern side of the Project site. The entire extent of Channel 2 is defined by an OHWM that varies in width between one foot at its narrowest and 3.5 feet at its widest (Figure 7). As discussed in Section D.4, the SDAM conducted for Channel 2 determined it is an ephemeral feature (Attachment F).

E.1.2.1 Ordinary High Water Mark Analysis
Channel 2 is an approximately 0.003-acre (43 linear feet) non-wetland water that runs through the center of the Project site (Table 2; Figure 7). Figure 7 shows the sampling points (NW-2-1 and NW-2-2) collected in Channel 2, which were within the OHWM of the channel. Photographs 6 through 8 in Attachment E provide representative views of the extent of Channel 2 on the Project site. The OHWM indicators were investigated at Sampling Points NW-2-1 and NW-2-2. The OHWMs documented at Sampling Points NW-2-1 and NW-2-2 are described below.

Sampling Point NW-2-1: The OHWM is approximately 3.5 feet wide and three feet deep (Photograph 6). The other OHWM indicators observed at Sampling Point NW-2-1 include a change in vegetation cover, a break in bank slope, and the presence of a defined bed and bank.

Sampling Point NW-2-1 was taken where Channel 2 formed from apparent erosion. The channel at Sampling Point NW-2-1 has upland grasses and weeds growing in the channel and on the banks.

At Sampling Point NW-2-1, Channel 2 is surrounded by disturbed habitat. Channel 2 is highly eroded and lower in elevation than the surrounding Project site, and the soil at Sampling Point NW-2-1 is sandy loam.

Sampling Point NW-2-2: The OHWM is approximately one foot wide and 0.5 foot deep (Photograph 7). The other OHWM indicators observed at Sampling Point NW-2-2 include a change in vegetation cover, a break in bank slope, and the presence of a defined bed and bank. Sampling Point NW-2-2 was taken directly west of where the defined Channel 2 ends and flows into the dirt road (Rhoda Lane) on the eastern side of the Project site, after which the channel becomes undefined (Photograph 8). The channel at Sampling Point NW-2-2 has upland grasses and weeds growing in the channel and on the banks. At Sampling Point NW-2-2, Channel 2 is surrounded by disturbed habitat. Channel 2 is slightly lower in elevation than the surrounding Project site, and the soil at Sampling Point NW-2-2 is sandy loam.

No hydrophytic vegetation, surface water, or saturated deposited soils were observed in Channel 2; therefore, no wetland sampling point was taken, and this feature was mapped as a non-wetland water. 10/24/2023 PH1 458 of 2254

Aquatic Resources Delineation Report 18 April 2023
Tideline Kensho Residential Project
E.1.3 Channel 3
Channel 3 enters the southeastern corner of the survey area and extends approximately 893 linear feet northwest along the eastern edge of the survey area where it ends in a disturbed upland area south of Guajome Street. Channel 3 is connected to a larger concrete channel to the east that is directed through a stormwater culvert under Guajome Street. The entire extent of Channel 3 that occurs in the survey area is defined by an OHWM with a width of one foot (Figure 7). As discussed in Section D.4, the SDAM conducted for Channel 3 determined it is an ephemeral feature (Attachment F).

E.1.3.1 Ordinary High Water Mark Analysis
Channel 3 is an approximately 0.02-acre (893-linear-foot) non-wetland water that extends along the eastern edge of the survey area (Table 2; Figure 7). Figure 7 shows the sampling point (NW-3-1) collected in Channel 3, which was within the OHWM of the channel. Photographs 9 through 12 in Attachment E provide representative views of the extent of Channel 3 in the survey area. The OHWM indicators were investigated at Sampling Point NW-3-1. The OHWM documented at Sampling Point NW-3-1 is described below.

Sampling Point NW-3-1: The OHWM is approximately 1 foot wide and 0.25 foot deep (Photograph 9). The other OHWM indicators observed at Sampling Point NW-3-1 include a break in bank slope and the presence of a defined bed and bank. Sampling Point NW-3-1 was taken in the northern portion of the channel where OHWM indicators were observed. The channel at Sampling Point NW-3-1 has upland grasses and weeds growing outside the banks. At Sampling Point NW-3-1, Channel 3 is surrounded by disturbed habitat and urban/developed land. Channel 3 was constructed on a slope that continues down into the SPRINTER transit right-of-way to the east. The soil outside of the channel at Sampling Point NW-3-1 is sandy loam.

No hydrophytic vegetation, surface water, or saturated deposited soils were observed in or around Channel 3; therefore, no wetland sampling point was taken, and this feature was mapped as a non-wetland water.

10/24/2023 PH1 459 of 2254

Aquatic Resources Delineation Report 19 April 2023
Tideline Kensho Residential Project
Section F Deviation from Local Wetlands Inventory or
National Wetlands Inventory
The NWI mapping results do not identify aquatic features on the Project site, in the off-site improvements area, or in the survey area (Figure 5). The non-vegetated earthen-bottom Channels 1 and 2 observed in the center of the Project site and the concrete-lined Channel 3 observed along the eastern edge of the survey area were not identified on the NWI mapping results. Channels 1 and 2 appear to have formed as a result of erosion from stormwater flows directed onto the Project site through a corrugated metal stormwater pipe on the western edge of the Project site. Channel 3 is an artificial, concrete-lined channel that was constructed to capture and direct stormwater flows away from the SPRINTER transit right-of-way. No other aquatic resources were identified in the NWI mapping results or observed on the Project site, in the off-site improvements area, or in the survey area during the aquatic resources delineation fieldwork.

10/24/2023 PH1 460 of 2254

Aquatic Resources Delineation Report 20 April 2023
Tideline Kensho Residential Project

This page intentionally left blank.

10/24/2023 PH1 461 of 2254

Aquatic Resources Delineation Report 21 April 2023
Tideline Kensho Residential Project
Section G Mapping Method
An aquatic resources specialist digitally mapped the limits of non-wetland, non-tidal waters at the OHWM using an ISXBlue II sub-meter Global Positioning System unit. Electronic spatial data collected in the field is in Attachment G.

10/24/2023 PH1 462 of 2254

Aquatic Resources Delineation Report 22 April 2023
Tideline Kensho Residential Project

This page intentionally left blank.

10/24/2023 PH1 463 of 2254

Aquatic Resources Delineation Report 23 April 2023
Tideline Kensho Residential Project
Section H Conclusions
Based on the investigation of wetland and non-wetland water indicators, the following aquatic resource areas occur on the Project site and in the survey area:

1. One earthen-bottom non-wetland water (Channel 1) was observed in the central portion of the Project site. Channel 1 accounts for approximately 0.016 acre (309 linear feet).

Based on database and on-site delineation results, the full extent of Channel 1 is limited to the Project site and does not connect or contribute flows to off-site aquatic resources and, therefore, is an isolated feature. The SDAM conducted for Channel 1 determined it is an ephemeral feature.

2. One earthen-bottom non-wetland water (Channel 2) was observed in the central portion of the Project site. Channel 2 accounts for approximately 0.003 acre (43 linear feet).

Based on database and on-site delineation results, the full extent of Channel 2 is limited to the Project site and does not connect or contribute flows to off-site aquatic resources and, therefore, is an isolated feature. The SDAM conducted for Channel 2 determined it is an ephemeral feature.

3. One concrete-lined non-wetland water (Channel 3) was observed along the eastern edge of the survey area. Channel 3 accounts for approximately 0.02 acre (893 linear feet).

Based on database and on-site delineation results, Channel 3 may have a downstream connection to Buena Vista Creek through the municipal stormwater system and, therefore, is an isolated feature. The SDAM conducted for Channel 3 determined it is an ephemeral feature.

Table 3, Summary of Non-Wetland Waters, includes the extent and summary of the aquatic resources, Channels 1 through 3, delineated on the Project site and in the survey area.

Table 3. Summary of Non-Wetland Waters
Feature
Cowardin
Type1 Acres Linear Feet Coordinates
Vegetation
Community/
Land Cover
Type Summary
Channel 1 R6 0.016 309 33.194999 N,
−117.240876 W
Non-vegetated
channel
Isolated, ephemeral
earthen-bottom
channel with OHWM
indicators present.

The OHWM varies in
width between 0.5
foot at its narrowest
and three feet at its
widest, with depths
varying between 0.25
and 0.50 foot.
10/24/2023 PH1 464 of 2254

Aquatic Resources Delineation Report 24 April 2023
Tideline Kensho Residential Project
Table 3. Summary of Non-Wetland Waters
Feature
Cowardin
Type1 Acres Linear Feet Coordinates
Vegetation
Community/
Land Cover
Type Summary
Channel 2 R6 0.003 43 33.195367 N,
−117.240182 W
Non-vegetated
channel
Isolated, ephemeral
earthen-bottom
channel with OHWM
indicators present.

The OHWM varies in
width between one
foot at its narrowest
and 3.5 feet at its
widest, with depths
varying between one
and three feet.

Channel 3 R6 0.020 893 33.196593 N,
−117.240733 W
Non-vegetated
channel
Ephemeral concrete-
lined channel with
OHWM indicators
present. The OHWM
is one foot wide and

0.25 foot deep.

Non-Wetland Total 0.038 1,245 —
Notes: OHWM = ordinary high water mark
1 Cowardin Type: R6 = A wetland, spring, stream, river, pond, or lake that only exists for a short period of time.

10/24/2023 PH1 465 of 2254

Aquatic Resources Delineation Report 25 April 2023
Tideline Kensho Residential Project
Section I Preliminary Jurisdictional Determinations
The aquatic resources observed on the Project site and in the survey area include Channels 1 through 3. Table 4, Preliminary Jurisdiction of Aquatic Resources, provides a summary of the aquatic resources and the potential jurisdiction of these features.

Channels 1 and 2 were determined to be isolated, ephemeral non-wetland waters that do not have a surface connection to a traditional navigable water or other off-site aquatic resources and do not carry a relatively permanent flow of water. Therefore, these features may not be considered jurisdictional by the USACE, Regional Water Quality Control Board (RWQCB), and/or California Department of Fish and Wildlife (CDFW) pursuant to Sections 401 and 404 of the Clean Water Act and Section 1602 of the California Fish and Game Code. Channel 3 may have a downstream connection to Buena Vista Creek through the municipal stormwater system and is preliminarily under the jurisdiction of the USACE, RWQCB, or CDFW pursuant to Clean Water Act, Sections 401 and 404, and California Fish and Game Code, Section 1602. Only the agencies can make a final determination of jurisdictional boundaries.

Table 4. Preliminary Jurisdiction of Aquatic Resources
Feature
Feature
Type
Vegetation
Community/
Land Cover
Type
Cowardin
Type1
Agency Jurisdiction
Description USACE RWQCB CDFW
Channel 1
Non-
wetland
water
Non-
vegetated
channel
R6 — — —
Isolated, ephemeral earthen-
bottom channel that forms at the
outlet of a two-foot-diameter
corrugated metal pipe and flows
approximately 309 linear feet
from west to east where it
become undefined when it
enters a dirt road (Rhoda Lane).

Channel 2
Non-
wetland
water
Non-
vegetated
channel
R6 — — —
Isolated, ephemeral earthen-
bottom channel that forms in an
upland and flows approximately
43 linear feet from west to east
where it become undefined
when it enters a dirt road (Rhoda
Lane).

Channel 3
Non-
wetland
water
Non-
vegetated
channel
(concrete-
lined)
R6 X X X
Ephemeral concrete-lined
channel that extends
approximately 893 linear feet
southeast to northwest where it
ends in a disturbed upland area.

The channel is connected to a
larger concrete channel to the
east that is directed through a
stormwater culvert under
Guajome Street.

Notes: CDFW = California Department of Fish and Wildlife; USACE = U.S. Army Corps of Engineers; RWQCB = Regional Water Quality Control Board
10/24/2023 PH1 466 of 2254

Aquatic Resources Delineation Report 26 April 2023
Tideline Kensho Residential Project

This page intentionally left blank.

10/24/2023 PH1 467 of 2254

Aquatic Resources Delineation Report 27 April 2023
Tideline Kensho Residential Project
Section J Disclaimer Statement
This aquatic resources delineation is subject to verification by the USACE, RWQCB, and CDFW.

Harris advises all parties to treat the information in this Aquatic Resources Delineation Report as preliminary until the agencies provide written verification of their jurisdictional boundaries.

10/24/2023 PH1 468 of 2254

Aquatic Resources Delineation Report 28 April 2023
Tideline Kensho Residential Project

This page intentionally left blank.

10/24/2023 PH1 469 of 2254

Aquatic Resources Delineation Report 29 April 2023
Tideline Kensho Residential Project
Section K References
Historic Aerials. 2023. “Historic Aerials.” Accessed April 2023. https://www.historicaerials .com/viewer.

NOAA (National Oceanic and Atmospheric Administration). 2023. Climatic Data Online.

Accessed April 2023. https://www.ncdc.noaa.gov/cdo-web/ .

NRCS (National Resources Conservation Service). 2023. National Water and Climate Center:

WETS Table. Accessed April 2023. https://www.nrcs.usda.gov/wps/portal/wcc/home/ climateSupport/agAcisClimateData/.

Oberbauer, Thomas, Meghan Kelly, and Jeremy Buegge. 2008. Draft Vegetation Communities of San Diego County. Based on “Preliminary Descriptions of the Terrestrial Natural Communities of California” prepared by Robert F. Holland, PhD, in October 1986. Codes revised by Thomas Oberbauer in February 1996, revised and expanded by Meghan Kelly in August 2006, and further revised and reorganized by Jeremy Buegge in March 2008. Accessed April 2023. https://www.sandiegocounty.gov/content/dam/sdc/pds/ceqa/Soitec-Documents/Final-EIR- Files/references/rtcref/ch9.0/rtcrefaletters/O14%202014-12-19_OberbauerTM2008.pdf.

Project Clean Water. 2023. “Carlsbad.” Accessed April 2023. http://www.projectcleanwater .org/carlsbad-wma/.

Safdie Rabines Architects. 2022. Kensho Housing: Site Development Plan Submittal.

USACE (U.S. Army Corps of Engineers). 1987. Corps of Engineers Wetlands Delineation Manual.

Final report. Wetlands Research Program Technical Report Y-87-1 (online edition). Prepared by Environmental Laboratory, U.S. Army Corps of Engineers, Waterways Experiment Station.

Wetlands Research Program. January. Accessed April 2023. http://www.cpe.rutgers.edu/ Wetlands/1987-Army-Corps-Wetlands-Delineation-Manual.pdf.

USACE. 2008a. Regional Supplement to the Corps of Engineers Wetlands Delineation Manual:

Arid West Region (Version 2.0). Final report. ERDC/EL TR-08-28. Prepared by Environmental Laboratory, U.S. Army Engineer Research and Development Center.

Wetlands Regulatory Assistance Program. September. Accessed April 2023. https://usace.contentdm.oclc.org/utils/getfile/collection/p266001coll1/id/7627 .

USACE. 2008b. A Field Guide to the Identification of the Ordinary High Water Mark (OHWM) in the Arid West Region of the Western United States: A Delineation Manual. ERDC/CRREL TR-08-

12. Prepared by Robert W. Lichvar and Shawn M. McColley. Cold Regions Research and Engineering Laboratory, U.S. Army Engineer Research and Development Center. August. 10/24/2023 PH1 470 of 2254

Aquatic Resources Delineation Report 30 April 2023
Tideline Kensho Residential Project
Accessed April 2023. https://www.spl.usace.army.mil/Portals/17/docs/regulatory/JD/Final OHWMManual_2008.pdf.

USACE. 2016. Updated Map and Drawing Standards for the South Pacific Division Regulatory Program. Last updated February 10. Accessed April 2023. http://www.spd.USACE .army.mil/Missions/Regulatory/PublicNoticesandReferences/tabid/10390/Article/651327/ updated-map-and-drawing-standards.aspx.

USACE. 2023a. “TNWs & Navigable Waters in Los Angeles District.” Accessed April 2023. https://www.spl.usace.army.mil/Missions/Regulatory/Jurisdictional-Determination/ Navigable-Waterways/.

USACE. 2023b. Antecedent Precipitation Tool. Accessed April 2023. https://github.com/ jDeters-USACE/Antecedent-Precipitation-Tool.

USDA (U.S. Department of Agriculture). 2019. Web Soil Survey. Natural Resources Conservation Service, Soil Survey Staff. Last modified July 31. Accessed April 2023. http://websoilsurvey.sc.egov.usda.gov/App/HomePage.htm .

USEPA (U.S. Environmental Protection Agency). 2023. Beta Streamflow Duration Assessment Method for the Arid West (Beta SDAM AW). Version 1.0. March 1. Accessed April 2023. https://betasdamaw-sccwrp.hub.arcgis.com/ .

USFWS (U.S. Fish and Wildlife Service). 2023. National Wetlands Inventory Wetlands Mapper. Last updated May 3. Accessed April 2023. https://www.fws.gov/wetlands/Data/Mapper.html .

USGS (U.S. Geological Survey). 2023. National Hydrography Dataset. Accessed April 2023. https://www.arcgis.com/home/webmap/viewer.html?url=https://hydro.nationalmap.gov/arcgis/ rest/services/nhd/MapServer&source=sd.

10/24/2023 PH1 471 of 2254

Attachment A. Figures

10/24/2023 PH1 472 of 2254

This page intentionally left blank.
10/24/2023 PH1 473 of 2254

Da
t
e
:

1 /
2 4
/
2 0
2 3

-

L
a
s
t

s
a
v
e
d

b
y
:

R
a
n
d
y
.

D
e
o
d
a
t

-

P
a
t
h
:

C
:
\
G
I
S
\
P
r
o
j
e
c
t
s
\
C
i
t
y

o
f

V
i
s
t
a
\
T
i
d
e
l
i
n
e

P
h
e
a
s
a
n
t

H
i
l
l
\
M
a
p

D
o
c
s
\
B
i
o
\
A
R
D
\F
i
g
u
r
e
1 _
R
e
g
i
o
n
a
l
L
o
c
a
t
i
o
n
.
m
x
d
Imperial
Beach
Chula
Vista
National
City Bonita
Lemon
Grove
Poway
Encinitas
Carlsbad Escondido
Vista Valley
Center
Hidden
MeadowsOceanside
Bonsall
Fallbrook
Rainbow
JamulSpring
Valley
AlpineHarbison
Canyon
Lakeside
Pine
Valley
El Cajon
Santee
Ramona San Diego
Country
Estates
Julian
Temecula
Wildomar
Cam
San Diego
ge C
o
u
n
t
y
San Diego County
Riverside County

MEXICOMEXICO
Pacific Ocean
ÄÆ52
ÄÆ54 ÄÆ94
ÄÆ94ÄÆ163
ÄÆ282
ÄÆ188ÄÆ905
ÄÆ54
ÄÆ274
ÄÆ74
ÄÆ209
ÄÆ79
ÄÆ56
ÄÆ75 ÄÆ125
ÄÆ74
ÄÆ79ÄÆ67
ÄÆ76
ÄÆ79
ÄÆ78
§¨¦5
§¨¦215
§¨¦5
§¨¦8
§¨¦15
§¨¦8
§¨¦5
§¨¦8
§¨¦805
§¨¦5
§¨¦15
Tideline Kensho Residential Project
Incorporated Areas
Regional Location
Source: ESRI 2021.

Figure 1±0105
Miles
Project Site
!(^
10/24/2023 PH1 474 of 2254

O
C
E
A
N
VI
E
W

C
T
TERR
A
C
E
DR
GU
A
J
O
M
E

S
T
RA
N
C
H
O

V
I
S
T
A

R
D
E
L

M
I
R
A
S
O
LYON

C
R
EUCA
L
Y
P
T
U
S

A
V
AS
T
R
O

C
T
UNN
A
M
E
D

5 5
T
H

R
D
PARK
A
V
BAND
I
N
I

P
L
HA
C
I
E
N
D
A

D
R
OCE
A
N

V
I
E
W

D
R
U
N
I
T
Y

W
Y
S
S
A
N
T
A

F
E

A
V
P
I
N
A

L
N

HILDALE CR

RANCHO VIS
T
A

P
L
PETE
R
S

D
R

MERCANTILE ST

LADO DE LO
M
A

D
R
ED
D
I
E

D
R
R
H
O
D
A

L
N
Project Site
Off-Site Improvements
Survey Area
Da
t
e
:

1 /
2 4
/
2 0
2 3

-

L
a
s
t

s
a
v
e
d

b
y
:

R
a
n
d
y
.

D
e
o
d
a
t

-

P
a
t
h
:

C
:
\
G
I
S
\
P
r
o
j
e
c
t
s
\
C
i
t
y

o
f

V
i
s
t
a
\
T
i
d
e
l
i
n
e

P
h
e
a
s
a
n
t

H
i
l
l
\
M
a
p

D
o
c
s
\
B
i
o
\
A
R
D
\F
i
g
u
r
e
2 _
P
r
o
j
e
c
t
S
i
t
e
.
m
x
d
Source: SanGIS Imagery 2017.
±0300150
Feet Project Site
Source: SanGIS Imagery 2017.

Figure 2
Tideline Kensho Residential Project
Poway
Encinitas
Carlsbad
Escondido
Vista Valley
Center
Hidden
MeadowsOceanside
Bonsall
Fallbrook
Rainbow
AlpineHarbi

s
o
n
C
Lak

e
s

i
d
e
Santee
Ramona
San Diego
Country
Estates
na
int
Capistrano Te me cu la
San Diego
San Dieg
o
County
San Diego County
Riverside Cou

n
t
y
Project Site
!(^
10/24/2023 PH1 475 of 2254

ÄÆ78
Project Site
Off-Site Improvements
Survey Area
Da
t
e
:

1 /
2 4
/
2 0
2 3

-

L
a
s
t

s
a
v
e
d

b
y
:

R
a
n
d
y
.

D
e
o
d
a
t

-

P
a
t
h
:

C
:
\
G
I
S
\
P
r
o
j
e
c
t
s
\
C
i
t
y

o
f

V
i
s
t
a
\
T
i
d
e
l
i
n
e

P
h
e
a
s
a
n
t

H
i
l
l
\
M
a
p

D
o
c
s
\
B
i
o
\
A
R
D
\F
i
g
u
r
e
3 _
U
S
G
S
T
o
p
o
.
m
x
d
Source: USGS Tideline Pheasant Hill Quadrangle 1975.
±01,000500
Feet USGS Topographic Map
Source: USGS Tideline Pheasant Hill Quadrangle 1975.

Figure 3
Tideline Kensho Residential Project10/24/2023 PH1 476 of 2254

TERR
A
C
E

D
R
GU
A
J
O
M
E

S
T
RA
N
C
H
O

V
I
S
T
A

R
D
E
L

M
I
R
A
S
O
AS
T
R
O

C
T
UNN
A
M
E
D

5 5
T
H

R
D

HILDALE
C
R
OCE
A
N

V
I
E
W

D
R
U
N
I
T
Y

W
Y
BAN
D
I
N
I

P
L
S
S
A
N
T
A

F
E

A
V
P
I
N
A

L
N

RANCHO VIS
T
A

P
L
M
E
R
C
A
N
T
I
L
E

S
T
PETE
R
S

D
R

LADO DE LO
M
A

D
R
ED
D
I
E

D
R
R
H
O
D
A

L
N
ÄÆ78
Project Site
Off-Site Improvements
Survey Area
Soils
Fallbrook Sandy Loam
Fallbrook-Vista Sandy Loam
Salinas Clay Loam
Da
t
e
:

1 /
2 4
/
2 0
2 3

-

L
a
s
t

s
a
v
e
d

b
y
:

R
a
n
d
y
.

D
e
o
d
a
t

-

P
a
t
h
:

C
:
\
G
I
S
\
P
r
o
j
e
c
t
s
\
C
i
t
y

o
f

V
i
s
t
a
\
T
i
d
e
l
i
n
e

P
h
e
a
s
a
n
t

H
i
l
l
\
M
a
p

D
o
c
s
\
B
i
o
\
A
R
D
\F
i
g
u
r
e
4 _
S
o
i
l
s
.
m
x
d
Source: USDA 1973; SanGIS Imagery 2017.
±0300150
Feet Soils
Source: USDA 1973; SanGIS Imagery 2017.

Figure 4
Tideline Kensho Residential Project10/24/2023 PH1 477 of 2254

E BROA
D
W
A
Y
GU
A
J
O
M
E

S
T
RA
N
C
H
O

V
I
S
T
A

R
D
RA
N
C
H
O
VIS
T
A

P
L
AS
T
R
O

C
T
UNN
A
M
E
D

5 5
T
H

R
D

HILDALE C
R
EU
C
A
L
Y
P
T
U
S

A
V
MA
I
N

S
T
TE
R
R
A
C
E

D
R
U
N
I
T
Y

W
Y
ALLEY
O
C
E
A
N

V
I
E
W

C
T
PUB
L
I
C

R
D
P
I
N
A

L
N
R
H
O
D
A

L
N
S
S
A
N
T
A

F
E

A
V
PA
R
K

A
V
PETE
R
S

D
R
OCE
A
N

V
I
E
W

D
R
ED
D
I
E

D
R
M
E
R
C
A
N
T
I
L
E

S
T

LADO DE LO
M
A

D
R
Project Site
Off-Site Improvements
Survey Area
Riverine Feature
Da
t
e
:

1 /
2 4
/
2 0
2 3

-

L
a
s
t

s
a
v
e
d

b
y
:

R
a
n
d
y
.

D
e
o
d
a
t

-

P
a
t
h
:

C
:
\
G
I
S
\
P
r
o
j
e
c
t
s
\
C
i
t
y

o
f

V
i
s
t
a
\
T
i
d
e
l
i
n
e

P
h
e
a
s
a
n
t

H
i
l
l
\
M
a
p

D
o
c
s
\
B
i
o
\
A
R
D
\F
i
g
u
r
e
5 _
N
W
I
.
m
x
d
Source: USFWS 2021; SanGIS Imagery 2017.
±0300150
Feet National Wetlands Inventory Results
Source: USFWS 2021; SanGIS Imagery 2017.

Figure 5
Tideline Kensho Residential Project10/24/2023 PH1 478 of 2254

Da
t
e
:

1 /
2 4
/
2 0
2 3

-

L
a
s
t

s
a
v
e
d

b
y
:

R
a
n
d
y
.

D
e
o
d
a
t

-

P
a
t
h
:

C
:
\
G
I
S
\
P
r
o
j
e
c
t
s
\
C
i
t
y

o
f

V
i
s
t
a
\
T
i
d
e
l
i
n
e

P
h
e
a
s
a
n
t

H
i
l
l
\
M
a
p

D
o
c
s
\
B
i
o
\
A
R
D
\F
i
g
u
r
e
6 _
V
e
g
e
t
a
t
i
o
n
C
o
m
m
u
n
i
t
i
e
s
.
m
x
d
O
C
E
A
N
VI
E
W

C
T
TERR
A
C
E

D
R
GU
A
J
O
M
E

S
T
RA
N
C
H
O

V
I
S
T
A

R
D
E
L

M
I
R
A
S
O
AS
T
R
O

C
T
UNN
A
M
E
D

5 5
T
H

R
D

HILDALE
C
R
OCE
A
N

V
I
E
W

D
R
U
N
I
T
Y

W
Y
BAN
D
I
N
I

P
L
S
S
A
N
T
A

F
E

A
V
P
I
N
A

L
N
R
H
O
D
A

L
N

RANCHO VIS
T
A

P
L
M
E
R
C
A
N
T
I
L
E

S
T
PETE
R
S

D
R

LADO DE LO
M
A

D
R
ED
D
I
E

D
R
Tideline Kensho Residential Project
Project Site
Off-Site Improvements
Survey Area
Vegetation Communities and
Land Cover Types
Coast Live Oak Woodland
Urban/Developed
Disturbed Habitat
Non-Native Grassland
Non-Vegetated Channel
Vegetation Communities and Land Cover Types
Source: SanGIS Imagery 2017.

Figure 6±0300150
Feet10/24/2023 PH1 479 of 2254

")
!
!
Ch
a
n
n
e
l

1 Ch
a
n
n
e
l

2 Ch
a
n
n
e
l

3 NW
-
1 -
1 NW
-
1 -
2 NW
-
1 -
3 NW
-
1 -
4 NW
-
2 -
1 NW
-
2 -
2 NW
-
3 -
1 33
.
1 9
5 ,
-
1 1
7 .
2 3
9 33
.
1 9
6 ,
-
1 1
7 .
2 4
1 Cr
e
a
t
e
d

o
n

J
u
l
y

2 8
t
h
,

2 0
2 1
Re
v
i
s
e
d

o
n

J
a
n
u
a
r
y

2 3
r
d
,

2 0
2 3
Co
o
r
d
i
n
a
t
e

S
y
s
t
e
m
:

N
A
D

1 9
8 3

C
a
l
i
f
o
r
n
i
a

S
t
a
t
e

P
l
a
n
e

Z
o
n
e

6 Pr
o
j
e
c
t
i
o
n
:

L
a
m
b
e
r
t

C
o
n
f
o
r
m
a
l

C
o
n
i
c
Da
t
u
m
:

N
o
r
t
h

A
m
e
r
i
c
a
n

1 9
8 3
Ve
r
t
i
c
a
l

D
a
t
u
m
:

N
o

C
o
o
r
d
i
n
a
t
e

S
y
s
t
e
m
1 i
n
c
h

=

1 0
0 f
e
e
t
Date: 1/24/2023 - Last saved by: Randy.Deodat - Path: C:\GIS\Projects\City of Vista\Tideline Pheasant Hill\Map Docs\Bio\ARD\Figure7_AquaticResources.mxd ±
01 00
50 Fe
e
t
Le
g
e
n
d
Pr
o
j
e
c
t

S
i
t
e
Of
f
-
S
i
t
e

I
m
p
r
o
v
e
m
e
n
t
s
Su
r
v
e
y

A
r
e
a

No
n
-
W
e
t
l
a
n
d

S
a
m
p
l
i
n
g

P
o
i
n
t
s
!
Re
f
e
r
e
n
c
e

P
o
i
n
t
s
")
Cu
l
v
e
r
t
No
n
-
W
e
t
l
a
n
d

W
a
t
e
r
s
Ch
a
n
n
e
l

1 (
0 .
0 1
5 a
c
r
e
)

(
3 2
1 l
i
n
e
a
r

f
t
)
Ch
a
n
n
e
l

2 (
0 .
0 0
3 a
c
r
e
)

(
4 3

l
i
n
e
a
r

f
t
)
Ch
a
n
n
e
l

3 (
0 .
0 2

a
c
r
e
)

(
8 8
1 l
i
n
e
a
r

f
t
)

Aq
u
a
t
i
c

R
e
s
o
u
r
c
e
s
fo
r

T
i
d
e
l
i
n
e

K
e
n
s
h
o
Re
s
i
d
e
n
t
i
a
l

P
r
o
j
e
c
t
Fi
g
u
r
e

7 Ma
d
e

i
n

a
c
c
o
r
d
a
n
c
e

w
i
t
h

t
h
e

U
p
d
a
t
e
d

M
a
p

a
n
d

D
r
a
w
i
n
g

S
t
a
n
d
a
r
d
s

fo
r

t
h
e

S
o
u
t
h

P
a
c
i
f
i
c

D
i
v
i
s
i
o
n

R
e
g
u
l
a
t
o
r
y

P
r
o
g
r
a
m
,

a
s

a
m
e
n
d
e
d

o
n
Fe
b
r
u
a
r
y

1 0
,

2 0
1 6
,

b
y
:

J
a
s
o
n

D
e
t
e
r
s
,

P
r
o
j
e
c
t

M
a
n
a
g
e
r

E
n
f
o
r
c
e
m
e
n
t

a
n
d

Sp
e
c
i
a
l

P
r
o
j
e
c
t
s

U
n
i
t

U
.

S
.

A
r
m
y

C
o
r
p
s

o
f

E
n
g
i
n
e
e
r
s

S
o
u
t
h

P
a
c
i
f
i
c

D
i
v
i
s
i
o
n

Sa
c
r
a
m
e
n
t
o

D
i
s
t
r
i
c
t
,

R
e
g
u
l
a
t
o
r
y

D
i
v
i
s
i
o
n
13 2
5 J

S
t
r
e
e
t
,

R
o
o
m

1 3
5 0
Sa
c
r
a
m
e
n
t
o
,

C
a
l
i
f
o
r
n
i
a

9 5
8 1
4 -
2 9
2 2
10/24/2023 PH1 480 of 2254

This page intentionally left blank.

10/24/2023 PH1 481 of 2254

Attachment B. Statement of Access

10/24/2023 PH1 482 of 2254

This page intentionally left blank.

10/24/2023 PH1 483 of 2254

Aquatic Resources Delineation Report B-1 April 2023
Tideline Kensho Residential Project
Statement of Access
Tideline Partners (property owner) allows U.S. Army Corps of Engineers (USACE) personnel to access the project site. The Project site is accessible from Interstate 5 by taking exit 51B onto State Route 78 East. Travel six miles east, then take exit 6B onto Vista Village Drive. Turn left onto Mar Vista Drive, then in 0.2 mile, turn right onto Lado de Loma Drive. In 0.6 mile, the Project site is on the eastern side of Lado De Loma Drive. The Project site is east of Lado De Loma Drive and south of Guajome Street in Vista, California 92083 (see Attachment A, Figures; Figure 1, Regional Location, and Figure 2, Project Site).

Lev Gershman, Managing Partner
Tideline Partners
2148 Jimmy Durante Boulevard, Suite B
Del Mar, California 92014
10/24/2023 PH1 484 of 2254

Aquatic Resources Delineation Report B-2 April 2023
Tideline Kensho Residential Project

This page intentionally left blank.

10/24/2023 PH1 485 of 2254

Attachment C. Antecedent Precipitation Tool and
NRCS WETS Table Results

10/24/2023 PH1 486 of 2254

This page intentionally left blank.

10/24/2023 PH1 487 of 2254

10/24/2023 PH1 488 of 2254

!"#$%#&'()
!!!!!!!!!!!!!!
!"#$%$*&*+,-.%/0$#12%31
4)56)7*)8%9)&:7.%; ,-*?1@A%>&B%
#)CD
1@A%>+-%
#)CD
1@A%>)&-%
#)CD
1@A%
E:)F+D
G &:NOIS PSIQ QOIJ JIQG &9 S;I; QPIS NGIP &: 1D: >&9 M6- M6( 16A $)D UF* V,@ W)F 1--( JTQS X X X X X X X <I<< <I
<<
JI
NJ
<IN; JI
T;
PIJQ

JTQO X X X X X X X X X X X X

JTQT X X X X X X X X X X X X
JTN<X X X X X X X X X X X X

JTNJ X X X X X X X X X X X X
JTN;X X X X <IGO <IG< <I<< <I<< <I
<<
#<I<<<I
<O
<ISN
JTNG #;IOS JIPO JIPG # <IJ; <I<< <I<; ;I
QS
<I
PT
GIJG <I
J<
J;I
;J
JTNP ;IQS <IGQ JIO< <IGS <IJT <I<; <I<< <I<< <I
<<
<I
G;

JISS JI
<N
OIPQ
JTNQ <IQS <ISJ JIGO QI<J <I<N <IJQ <IJP # <I
;;
<I
<<
SIP<QI
;T
;<I
TG
JTNN JIG; JIQ< <IPG # <I<; #<I<< <I<< <I
JQ
<I
GO

JIQN QI
TO
JJI
GP
JTNS ;ITN <I<< ;IJJ GINO <I<Q <I;J <I<< <I<< # <I
<<
;IGP ;I
OJ
JPI
JN
JTNO <IN< <IGN GIJQ <IOP <I;G <IJ; <I<Q <I<< <I
<<
X<IPGJI
JG
NITJ
10/24/2023 PH1 489 of 2254

!!!!!!!!!!!!!!
JTNT NITJ SI;J ;IPT GIG; JIPG PIOG ;I
SQ
J # ;IO; >JJI GI ;I <IJS <ISG <IQS <I<Q <I<;# <I<< <I ;O
<I
<;
JITG ;I
<S
NI<S
10/24/2023 PH1 490 of 2254

!!!!!!!!!!!!!!
; GITG JI
PO
;I
TG
JPI
TS
; SI JIJP JI JI;S >;IPO >JISQ GIOO ;I;Q JI
PT
GI
N QI;G GIP JI
QP
> JITJ >;IQ; ;INP >JIJ; >JI ;I
GJ
JING JISO >JIPS PIOP X X X X X X X X X X X PIOP
V,*)7.%W&*&%C+77+-A%+-%
&-9%C,-*?%?&@)%&-%a>a%
L(&AI%1%a#a%+-8+F&*)7%&%
*:&F)%,L%D:)F+D+*&*+,-I
W&*&%C+77+-A%L,:%&((%8&97%
+-%&%C,-*?%,:%9)&:%+7%
'(&-bI
3:)&*+,-%8&*).%;<;G=<J=;P
10/24/2023 PH1 491 of 2254

Attachment D. Arid West Wetland Determination and
Ordinary High Water Mark Datasheets

10/24/2023 PH1 492 of 2254

This page intentionally left blank.

10/24/2023 PH1 493 of 2254

Arid West Ephemeral and Intermittent Streams OHWM Datasheet Project: Date: Time:

Project Number:Town: State:

Stream:Photo begin file#: Photo end file#:

Investigator(s):

Y / N Do normal circumstances exist on the site?
Y / N Is the site significantly disturbed?
Location Details:

Projection:Datum:

Coordinates:

Potential anthropogenic influences on the channel system:

Brief site description:

Checklist of resources (if available):

Aerial photography
Dates:

Topographic maps
Geologic maps
Vegetation maps
Soils maps
Rainfall/precipitation maps
Existing delineation(s) for site
Global positioning system (GPS)
Other studies
Stream gage data
Gage number:

Period of record:

History of recent effective discharges
Results of flood frequency analysis
Most recent shift-adjusted rating
Gage heights for 2-, 5-, 10-, and 25-year events and the most recent event exceeding a 5-year event
Procedure for identifying and characterizing the floodplain units to assist in identifying the OHWM:

1. Walk the channel and floodplain within the study area to get an impression of the geomorphology and vegetation present at the site.

2. Select a representative cross section across the channel. Draw the cross section and label the floodplain units.

3. Determine a point on the cross section that is characteristic of one of the hydrogeomorphic floodplain units. a) Record the floodplain unit and GPS position.
b) Describe the sediment texture (using the Wentworth class size) and the vegetation characteristics of the floodplain unit.
c) Identify any indicators present at the location.

4. Repeat for other points in different hydrogeomorphic floodplain units across the cross section.

5. Identify the OHWM and record the indicators. Record the OHWM position via:

Mapping on aerial photograph GPS
Digitized on computer Other:

Tideline Pheasant Hill Residential 9:00am - 9:45am
CAVista
Unnamed Channel 1 (AF-1; NW-1-1 through NW-1-4)
Katie Laybourn
X
X
The project site is surrounded by single-family residential neighborhoods to the north, west and south, commercial
development to the northeast, and the SPRINTER railroad tracks to the east

33.194999 N, -117.240876 W -

33.195425 N, -117.240058 W
NAD83
The majority of the project site is undeveloped, and the entire property has historically been disturbed with mowing and other mechanical disturbances, including repeated vehicle use through the center and along the dirt access road on the east side of the site.

The project site is in a residential and commercial portion of the city surrounded by single-family residential neighborhoods to the north, west and south, commercial development to the northeast, and the SPRINTER railroad tracks to the east. The project site consists of coast live oak woodland, non-native grassland, disturbed habitat, single-family residences, and native and non-native trees around the edges. The majority of the project site is undeveloped.

X
X
X
X
X
X
July 20, 2021
10/24/2023 PH1 494 of 2254

Project ID:Cross section ID:Date:Time:

Cross section drawing:

OHWM
GPS point: ___________________________
Indicators:

Change in average sediment texture Break in bank slope
Change in vegetation species Other: ____________________ Change in vegetation cover Other: ____________________
Comments:

Floodplain unit:Low-Flow Channel Active Floodplain Low Terrace GPS point: ___________________________
Characteristics of the floodplain unit:

Average sediment texture: __________________
Total veg cover: _____ % Tree: _____% Shrub: _____% Herb: _____% Community successional stage:

NA Mid (herbaceous, shrubs, saplings)
Early (herbaceous & seedlings)Late (herbaceous, shrubs, mature trees) Indicators:

Mudcracks Soil development
Ripples Surface relief
Drift and/or debris Other: ____________________
Presence of bed and bank Other: ____________________
Benches Other: ____________________
Comments:

NW-1-1 July 20, 2021 9:00amTideline Pheasant
Hill Residential
NW-1-1
NW-1-1
X
OHWM width = 2 ft
OHWM depth = 0.5 ft
Top of bank width = 3 ft
X
X
X
Corrugated metal stormwater pipe located approximately 2 feet west of sampling point NW-1-1; channel heavily eroded and stormwater pipe is filled with sediment and appears to be clogged with the sediment
Sandy loam
110 20 0 90
X
X
10/24/2023 PH1 495 of 2254

Project ID:Cross section ID:Date:Time:

Cross section drawing:

OHWM
GPS point: ___________________________
Indicators:

Change in average sediment texture Break in bank slope
Change in vegetation species Other: ____________________ Change in vegetation cover Other: ____________________
Comments:

Floodplain unit:Low-Flow Channel Active Floodplain Low Terrace GPS point: ___________________________
Characteristics of the floodplain unit:

Average sediment texture: __________________
Total veg cover: _____ % Tree: _____% Shrub: _____% Herb: _____% Community successional stage:

NA Mid (herbaceous, shrubs, saplings)
Early (herbaceous & seedlings)Late (herbaceous, shrubs, mature trees) Indicators:

Mudcracks Soil development
Ripples Surface relief
Drift and/or debris Other: ____________________
Presence of bed and bank Other: ____________________
Benches Other: ____________________
Comments:

NW-1-2 July 20, 2021 9:15amTideline Pheasant
Hill Residential
NW-1-2
NW-1-2
X
OHWM width = 3 ft
OHWM depth = 0.5 ft
Top of bank width = 4 ft
X
X
X
Highly eroded and incised channel at sampling point NW-2 Sandy loam
90 0 0 90
X
X
10/24/2023 PH1 496 of 2254

Project ID:Cross section ID:Date:Time:

Cross section drawing:

OHWM
GPS point: ___________________________
Indicators:

Change in average sediment texture Break in bank slope
Change in vegetation species Other: ____________________ Change in vegetation cover Other: ____________________
Comments:

Floodplain unit:Low-Flow Channel Active Floodplain Low Terrace GPS point: ___________________________
Characteristics of the floodplain unit:

Average sediment texture: __________________
Total veg cover: _____ % Tree: _____% Shrub: _____% Herb: _____% Community successional stage:

NA Mid (herbaceous, shrubs, saplings)
Early (herbaceous & seedlings)Late (herbaceous, shrubs, mature trees) Indicators:

Mudcracks Soil development
Ripples Surface relief
Drift and/or debris Other: ____________________
Presence of bed and bank Other: ____________________
Benches Other: ____________________
Comments:

NW-1-3 July 20, 2021 9:30amTideline Pheasant
Hill Residential
NW-1-3
NW-1-3
X
OHWM width = 1 ft
OHWM depth = 0.25 ftTop of bank width = 1.5 ft
X
X
X
Sandy clay loam
95 75 0 20
X
X
Shallow channel that runs through the coast live oak woodland, sediment changes to more clayey texture
X
X
Evidence of leaf and vegetation litter/debris and sediment deposition within shallow channel at sampling point NW-1-3
10/24/2023 PH1 497 of 2254

Project ID:Cross section ID:Date:Time:

Cross section drawing:

OHWM
GPS point: ___________________________
Indicators:

Change in average sediment texture Break in bank slope
Change in vegetation species Other: ____________________ Change in vegetation cover Other: ____________________
Comments:

Floodplain unit:Low-Flow Channel Active Floodplain Low Terrace GPS point: ___________________________
Characteristics of the floodplain unit:

Average sediment texture: __________________
Total veg cover: _____ % Tree: _____% Shrub: _____% Herb: _____% Community successional stage:

NA Mid (herbaceous, shrubs, saplings)
Early (herbaceous & seedlings)Late (herbaceous, shrubs, mature trees) Indicators:

Mudcracks Soil development
Ripples Surface relief
Drift and/or debris Other: ____________________
Presence of bed and bank Other: ____________________
Benches Other: ____________________
Comments:

NW-1-4 July 20, 2021 9:45amTideline Pheasant
Hill Residential
NW-1-4
NW-1-4
X
OHWM width = 0.5 ft
OHWM depth = 0.25 ftTop of bank width = 1 ft
X
X
X
Sandy clay loam
90 0 0 90
X
X
Sampling point NW-1-4 is the end of the channel; flows appear to exit the channel onto the dirt road where flows spread out on road surface; shallow channel is eroded where it empties onto the dirt road X
Evidence of vegetation litter/debris within shallow channel at sampling point NW-1-4 10/24/2023 PH1 498 of 2254

Arid West Ephemeral and Intermittent Streams OHWM Datasheet Project: Date: Time:

Project Number:Town: State:

Stream:Photo begin file#: Photo end file#:

Investigator(s):

Y / N Do normal circumstances exist on the site?
Y / N Is the site significantly disturbed?
Location Details:

Projection:Datum:

Coordinates:

Potential anthropogenic influences on the channel system:

Brief site description:

Checklist of resources (if available):

Aerial photography
Dates:

Topographic maps
Geologic maps
Vegetation maps
Soils maps
Rainfall/precipitation maps
Existing delineation(s) for site
Global positioning system (GPS)
Other studies
Stream gage data
Gage number:

Period of record:

History of recent effective discharges
Results of flood frequency analysis
Most recent shift-adjusted rating
Gage heights for 2-, 5-, 10-, and 25-year events and the most recent event exceeding a 5-year event
Procedure for identifying and characterizing the floodplain units to assist in identifying the OHWM:

1. Walk the channel and floodplain within the study area to get an impression of the geomorphology and vegetation present at the site.

2. Select a representative cross section across the channel. Draw the cross section and label the floodplain units.

3. Determine a point on the cross section that is characteristic of one of the hydrogeomorphic floodplain units. a) Record the floodplain unit and GPS position.
b) Describe the sediment texture (using the Wentworth class size) and the vegetation characteristics of the floodplain unit.
c) Identify any indicators present at the location.

4. Repeat for other points in different hydrogeomorphic floodplain units across the cross section.

5. Identify the OHWM and record the indicators. Record the OHWM position via:

Mapping on aerial photograph GPS
Digitized on computer Other:

Tideline Pheasant Hill Residential 10:00am
CAVista
Unnamed Channel 2 (AF-2; NW-2-1 and NW-2-2)
Katie Laybourn
X
X
The project site is surrounded by single-family residential neighborhoods to the north, west and south, commercial
development to the northeast, and the SPRINTER railroad tracks to the east

33.195367 N, -117.240182 W ;

33.195493 N, -117.240097 W
NAD83
The majority of the project site is undeveloped, and the entire property has historically been disturbed with mowing and other mechanical disturbances, including repeated vehicle use through the center and along the dirt access road on the east side of the site.

The project site is in a residential and commercial portion of the city surrounded by single-family residential neighborhoods to the north, west and south, commercial development to the northeast, and the SPRINTER railroad tracks to the east. The project site consists of coast live oak woodland, non-native grassland, disturbed habitat, single-family residences, and native and non-native trees around the edges. The majority of the project site is undeveloped.

X
X
X
X
X
X
July 20, 2021
10/24/2023 PH1 499 of 2254

Project ID:Cross section ID:Date:Time:

Cross section drawing:

OHWM
GPS point: ___________________________
Indicators:

Change in average sediment texture Break in bank slope
Change in vegetation species Other: ____________________ Change in vegetation cover Other: ____________________
Comments:

Floodplain unit:Low-Flow Channel Active Floodplain Low Terrace GPS point: ___________________________
Characteristics of the floodplain unit:

Average sediment texture: __________________
Total veg cover: _____ % Tree: _____% Shrub: _____% Herb: _____% Community successional stage:

NA Mid (herbaceous, shrubs, saplings)
Early (herbaceous & seedlings)Late (herbaceous, shrubs, mature trees) Indicators:

Mudcracks Soil development
Ripples Surface relief
Drift and/or debris Other: ____________________
Presence of bed and bank Other: ____________________
Benches Other: ____________________
Comments:

NW-2-1 July 20, 2021 10:00amTideline Pheasant
Hill Residential
NW-2-1
NW-2-1
X
OHWM width = 3.5 ft
OHWM depth = 3 ft
Top of bank width = 4 ft
X
X
Sandy loam
95 0 0 95
X
X
Sampling point NW-2-1 is where the isolated erosional channel forms in uplands; historic flows from the stormwater pipe east of NW-2-1 appear to have eroded this channel, and flows may have been diverted from mechanical or vehicle disturbance, or growth of the coast live oak woodland east of NW-2-1
Channel overgrown with upland grasses at NW-2-1
10/24/2023 PH1 500 of 2254

Project ID:Cross section ID:Date:Time:

Cross section drawing:

OHWM
GPS point: ___________________________
Indicators:

Change in average sediment texture Break in bank slope
Change in vegetation species Other: ____________________ Change in vegetation cover Other: ____________________
Comments:

Floodplain unit:Low-Flow Channel Active Floodplain Low Terrace GPS point: ___________________________
Characteristics of the floodplain unit:

Average sediment texture: __________________
Total veg cover: _____ % Tree: _____% Shrub: _____% Herb: _____% Community successional stage:

NA Mid (herbaceous, shrubs, saplings)
Early (herbaceous & seedlings)Late (herbaceous, shrubs, mature trees) Indicators:

Mudcracks Soil development
Ripples Surface relief
Drift and/or debris Other: ____________________
Presence of bed and bank Other: ____________________
Benches Other: ____________________
Comments:

NW-2-2 July 20, 2021 10:15amTideline Pheasant
Hill Residential
NW-2-2
NW-2-2
X
OHWM width = 1ft
OHWM depth = 0.5 ft
Top of bank width = 2 ft
X
X
Sandy loam
90 0 0 90
X
X
Sampling point NW-2-2 is where the isolated erosional channel ends and flows into the dirt road to the east where flows appear to spread out and the channel becomes undefined
10/24/2023 PH1 501 of 2254

Arid West Ephemeral and Intermittent Streams OHWM Datasheet Project: Date: Time:

Project Number:Town: State:

Stream:Photo begin file#: Photo end file#:

Investigator(s):

Y / N Do normal circumstances exist on the site?
Y / N Is the site significantly disturbed?
Location Details:

Projection:Datum:

Coordinates:

Potential anthropogenic influences on the channel system:

Brief site description:

Checklist of resources (if available):

Aerial photography
Dates:

Topographic maps
Geologic maps
Vegetation maps
Soils maps
Rainfall/precipitation maps
Existing delineation(s) for site
Global positioning system (GPS)
Other studies
Stream gage data
Gage number:

Period of record:

History of recent effective discharges
Results of flood frequency analysis
Most recent shift-adjusted rating
Gage heights for 2-, 5-, 10-, and 25-year events and the most recent event exceeding a 5-year event
Procedure for identifying and characterizing the floodplain units to assist in identifying the OHWM:

1. Walk the channel and floodplain within the study area to get an impression of the geomorphology and vegetation present at the site.

2. Select a representative cross section across the channel. Draw the cross section and label the floodplain units.

3. Determine a point on the cross section that is characteristic of one of the hydrogeomorphic floodplain units. a) Record the floodplain unit and GPS position.
b) Describe the sediment texture (using the Wentworth class size) and the vegetation characteristics of the floodplain unit.
c) Identify any indicators present at the location.

4. Repeat for other points in different hydrogeomorphic floodplain units across the cross section.

5. Identify the OHWM and record the indicators. Record the OHWM position via:

Mapping on aerial photograph GPS
Digitized on computer Other:

Tideline Pheasant Hill Residential 10:45am
CAVista
Unnamed Channel 3 (concrete-lined) (AF-3; NW-3-1)
Katie Laybourn
X
X
The project site is surrounded by single-family residential neighborhoods to the north, west and south, commercial
development to the northeast, and the SPRINTER railroad tracks to the east

33.196593 N, -117.240733 W
NAD83
Concrete-lined channel in the SPRINTER railroad right-of-way; trash and debris, the channel's source of water is likely urban stormwater runoff
The survey area is in a residential and commercial portion of the city surrounded by single-family residential neighborhoods to the north, west and south, commercial development to the northeast, and the SPRINTER railroad tracks to the east. The channel is in a disturbed and developed railroad corridor.

X
X
X
X
X
X
January 19, 2023
10/24/2023 PH1 502 of 2254

Project ID:Cross section ID:Date:Time:

Cross section drawing:

OHWM
GPS point: ___________________________
Indicators:

Change in average sediment texture Break in bank slope
Change in vegetation species Other: ____________________ Change in vegetation cover Other: ____________________
Comments:

Floodplain unit:Low-Flow Channel Active Floodplain Low Terrace GPS point: ___________________________
Characteristics of the floodplain unit:

Average sediment texture: __________________
Total veg cover: _____ % Tree: _____% Shrub: _____% Herb: _____% Community successional stage:

NA Mid (herbaceous, shrubs, saplings)
Early (herbaceous & seedlings)Late (herbaceous, shrubs, mature trees) Indicators:

Mudcracks Soil development
Ripples Surface relief
Drift and/or debris Other: ____________________
Presence of bed and bank Other: ____________________
Benches Other: ____________________
Comments:

NW-3-1 January 19, 2023 10:45amTideline Pheasant
Hill Residential
NW-3-1
NW-3-1
X
OHWM width = 1 ft
OHWM depth = 0.25 ft
Top of bank width = 3 ft
X
Sandy loam
40 0 0 40
X
X
Concrete-lined channel with an OHWM visible
Weeds and upland grasses occur outside of the concrete-lined channel 10/24/2023 PH1 503 of 2254

Attachment E. Photographic Log

10/24/2023 PH1 504 of 2254

This page intentionally left blank.

10/24/2023 PH1 505 of 2254

!(&
!(&
!(&
!(&
!(&
!(&
!(&!(&
!(
&
!(&
!(
&
!(
&
Ch
a
n
n
e
l

1 Ch
a
n
n
e
l

2 Ch
a
n
n
e
l

3 1
2 3
4 5
67 8
9 10
11 12
Date: 1/24/2023 - Last saved by: Randy.Deodat - Path: C:\GIS\Projects\City of Vista\Tideline Pheasant Hill\Map Docs\Bio\ARD\AttachmentE_PhotoLog.mxd Ph
o
t
o

L
o
g
So
u
r
c
e
:

S
a
n
G
I
S

I
m
a
g
e
r
y

2 0
1 7
.
±
At
t
a
c
h
m
e
n
t

E
01 0
0 50
Fe
e
t
Pr
o
j
e
c
t

S
i
t
e
Of
f
-
S
i
t
e

I
m
p
r
o
v
e
m
e
n
t
s
Su
r
v
e
y

A
r
e
a
!(&
Ph
o
t
o

L
o
c
a
t
i
o
n
s
Aq
u
a
t
i
c

R
e
s
o
u
r
c
e
s
N
o
n
-
W
e
t
l
a
n
d

W
a
t
e
r
s
Ti
d
e
l
i
n
e

K
e
n
s
h
o

R
e
s
i
d
e
n
t
i
a
l

P
r
o
j
e
c
t
10/24/2023 PH1 506 of 2254

Aquatic Resources Delineation Report E-2 April 2023
Tideline Kensho Residential Project

This page intentionally left blank.

10/24/2023 PH1 507 of 2254

Aquatic Resources Delineation Report E-3 April 2023
Tideline Kensho Residential Project
Channel 1

Photograph 1: (33.194999 N, −117.240876 W) Northwest-facing view of the western reach of the two-foot-wide Channel 1 in the western portion of the Project site. This photo also shows where the highly eroded channel forms at the outlet of the two-foot- diameter corrugated metal culvert on the western edge of the Project site. This photo shows where Sampling Point NW-1-1 was taken to determine the presence of OHWM indicators. This photo also shows the sediment clogging the corrugated metal culvert and the erosion of the channel at the outlet of the culvert.

Photograph 2: (33.194999 N, −117.240876 W) East-facing view of the western reach of the two-foot-wide earthen-bottom channel in the western portion of the Project site. This photo shows where Sampling Point NW-1-1 was taken to determine the presence of OHWM indicators.

10/24/2023 PH1 508 of 2254

Aquatic Resources Delineation Report E-4 April 2023
Tideline Kensho Residential Project

Photograph 3: (33.195070 N, −117.240741 W) East-facing view of the three-foot-wide Channel 1 in the western portion of the Project site. This photo shows where Sampling Point NW-1-2 was taken to determine the presence of OHWM indicators.

Photograph 4: (33.195244 N, −117.240321 W) East-facing view of the one-foot-wide Channel 1 in the central portion of the Project site. This photo shows where Sampling Point NW-1-3 was taken to determine the presence of OHWM indicators. This photo shows where Channel 1 runs through the interior coast live oak woodland in the central portion of the Project site and where Channel 1 becomes shallow and changes soil texture.

10/24/2023 PH1 509 of 2254

Aquatic Resources Delineation Report E-5 April 2023
Tideline Kensho Residential Project

Photograph 5: (33.195425 N, −117.240058 W) East-facing view of the 0.5-foot-wide Channel 1 in the eastern portion of the Project site. This photo shows where Sampling Point NW-1-4 was taken to determine the presence of OHWM indicators. This photo also shows where the defined Channel 1 ends and flows into a dirt road on the eastern side of the Project site.

Channel 2

Photograph 6: (33.195367 N, −117.240182 W) East-facing view of the 3.5-foot-wide Channel 2 in the central portion of the Project site. This photo shows where Sampling Point NW-2-1 was taken to determine the presence of OHWM indicators. This photo also shows where Channel 2 formed from apparent erosion.

10/24/2023 PH1 510 of 2254

Aquatic Resources Delineation Report E-6 April 2023
Tideline Kensho Residential Project

Photograph 7: (33.195493 N, −117.240097 W) West-facing view of the one-foot-wide Channel 2 in the eastern portion of the Project site. This photo shows where Sampling Point NW-2-2 was taken to determine the presence of OHWM indicators.

Photograph 8: (33.195493 N, −117.240097 W) Southeast-facing view of the one-foot-wide Channel 2 in the eastern portion of the Project site. This photo shows where Sampling Point NW-2-2 was taken to determine the presence of OHWM indicators.

This photo shows where the defined Channel 2 ends and flows into the dirt road on the eastern side of the Project site.

10/24/2023 PH1 511 of 2254

Aquatic Resources Delineation Report E-7 April 2023
Tideline Kensho Residential Project
Channel 3

Photograph 9: (33.196593 N, −117.240733 W) Southeast-facing view of the one-foot-wide Channel 3 along the eastern edge of the survey area. This photo shows where Sampling Point NW-3-1 was taken to determine the presence of OHWM indicators. The northern extent of the concrete-lined channel is also visible in the lower-half of the photo.

Photograph 10: (33.196412 N, −117.240628 W) East-facing view of Channel 3 along the eastern edge of the survey area.

This photo shows where Channel 3 connects to another larger concrete-lined channel that runs parallel east of the survey area through the SPRINTER transportation right-of-way.

10/24/2023 PH1 512 of 2254

Aquatic Resources Delineation Report E-8 April 2023
Tideline Kensho Residential Project
Photograph 11: (33.196216 N, −117.240421 W) Southeast-facing view of Channel 3. This photo shows the upland grasses and weeds growing outside of the channel banks. The eastern side of the Project site and the chain-link fence separating it from the eastern portion of the survey area is visible in the upper right-hand-corner of the photograph.

Photograph 12: (33.195849 N, −117.240079 W) Southeast-facing view of Channel 3 along the eastern edge of the survey area. Channel 3 continues southeast where it enters the southeastern corner of the survey area.

10/24/2023 PH1 513 of 2254

Attachment F. SDAM for the Arid West Forms

10/24/2023 PH1 514 of 2254

This page intentionally left blank.

10/24/2023 PH1 515 of 2254

Field form for the beta Arid Streamflow Duration Assessment Method Revision Date December 8, 2020 Page 1 of 4

Beta Arid West Streamflow Duration Assessment Method
General site information
Project name or number: Tideline Kensho Residential Project

Site code or identifier: N/A

Assessor(s): Katie Laybourn

Waterway name: Unnamed Channel 1

Visit date: 7/20/2021

Current weather conditions (check one)
□ Storm/heavy rain
□ Steady rain
□ Intermittent rain
□ Snowing
□ Cloudy (___ % cover)
□ Clear/Sunny
Notes on current or recent weather
conditions (e.g., precipitation in previous
week): Hot, sunny weather and no
precipitation in the week prior to
delineation.

Coordinates at downstream end
(decimal degrees):

Lat (N): 33.194999 N

Long (W): -117.240876 W

Datum: NAD83

Surrounding land-use within 100 m (check one or two):
□ Urban/industrial/residential
□ Agricultural (farmland, crops, vineyards, pasture)
□ Developed open-space (e.g., golf course)
□ Forested
□ Other natural
□ Other: ____________________________________
Describe reach boundaries: The extent of channel 1 that runs through the project site begins on the western edge of the project site and runs approximately 309 linear feet east through the center of the site to a dirt road that runs along the eastern side of the project site.

Mean channel width (m)

1.5 feet (0.46 m)
Reach length (m):
40x width; min 40 m; max 200 m.
309 feet (94.2 m)
Enter photo ID, or check if completed
Attachment E, Photographs 1 through 5
Disturbed or difficult conditions (check all that apply):
□ Recent flood or debris flow
□ Stream modifications (e.g., channelization)
□ Diversions
□ Discharges
□ Drought
□ Vegetation removal/limitations
□ Other (explain in notes)
□ None
Notes on disturbances or difficult site conditions: Channel 1 formed from stormwater flows exiting a 2 -foot diameter corrugated metal culvert on the west side of the project site that runs under Lado de Loma Drive west of the site.

Observed hydrology:
__0____ % of reach with surface flow
___0___ % of reach with sub-surface or surface flow
___0___ # of isolated pools
Comments on observed hydrology: No surface water flow
observed during delineation.

Site sketch:

Western Reach (sampling point NW-1)
Central Reach 1 (sampling point NW-2)
Central Reach 2 (sampling point NW-3)
10/24/2023 PH1 516 of 2254

Field form for the beta Arid Streamflow Duration Assessment Method Revision Date December 8, 2020 Page 2 of 4
Eastern Reach (sampling point NW-4)

1. Hydrophytic plant species
Record up to 5 hydrophytic plant species (FACW or OBL in the Arid West regional wetland plant list) within the assessment area: within the channel or up to one half-channel width. Explain in notes if species has an odd distribution (e.g., covers less than 2% of assessment area, long-lived species solely represented by seedlings, or long-lived species solely represented by specimens in decline), or if there is uncertainty about the identification. Enter photo ID, or check if photo is taken.

Check if applicable: □No vegetation in assessment area □No hydrophytes in assessment area Species
Odd
distribution?Notes
Photo
ID
N/A
Notes on hydrophytic vegetation:All vegetation observed in and around Channel 1 were upland species 2 and 3. Aquatic invertebrates

2. How many aquatic
invertebrates are
quantified in a 15-minute
search?

3. Is there evidence of aquatic stages of EPT (Ephemeroptera, Plecoptera and Trichoptera)?
Yes / No
Number of
individuals
quantified:
(Do not
count
mosquitos)
□ None
□ 1 to 19
□ 20 +
Photo ID:___N/A___________Ephemeroptera larva
Image credit: Dieter Tracey
Plecoptera larva
Tracey Saxby
Trichoptera larva
Tracey Saxby
Notes on aquatic invertebrates:None observed

4. Algal Cover
Are algae found on the
streambed?
□ Check if all observed
algae appear to be deposited
from an upstream source.
□Not detected
□ Yes, <10% cover
□ Yes, ≥10%(check
Yes in single
indicator below)
Notes on algae cover:None observed Photo ID:

Photos 1
through 5

5. Are single indicators observed?
Indicator Present Notes Photo ID
Fish □ Yes
□No, no fish
□ No, only non-native mosquitofish
None observed Photos 1
through 5
Algae cover ≥ 10%□ Yes
□No
None observed Photos 1
through 5
Supplemental information E.g., aquatic or semi-aquatic amphibians, snakes, or turtles; iron-oxidizing bacteria and fungi; etc.
10/24/2023 PH1 517 of 2254

Field form for the beta Arid Streamflow Duration Assessment Method Revision Date December 8, 2020 Page 3 of 4

Photo log
Indicate if any other photos taken during the assessment Photo ID Description
Photos 1 through 5 Attachment E, Photographic Log

Additional notes about the assessment:

10/24/2023 PH1 518 of 2254

Field form for the beta Arid Streamflow Duration Assessment Method Revision Date December 8, 2020 Page 4 of 4

Classification: _____Ephemeral_________________

Shading provided to enhance readability by increasing the contrast between neighboring cells; empty cells indicate the classification will not change with additional information however it is recommended that all five indicators be measured and recorded during every assessment.

1. Hydrophytic
plant species

2. Aquatic
invertebrates

3. EPT
taxa

4. Algae 5. Single indicators
x fish present
x algae cover ≥ 10%
Classification
None
None Absent
Absent Absent Ephemeral
Present At least intermittent
Present Absent Need more information
Present At least intermittent
Few (1-19)
Absent
Absent Absent Need more information
Present At least intermittent
Present Absent Need more information
Present At least intermittent
Present At least intermittent
Many (20+)
Absent
Absent Absent Need more information
Present At least intermittent
Present Absent Need more information
Present At least intermittent
Present At least intermittent
Few (1-2)
None Absent Absent Absent Need more information
Present At least intermittent
Present At least intermittent
Few (1-19)
Absent Absent Intermittent
Present At least intermittent
Present At least intermittent
Many (20+)
Absent Absent Intermittent
Present At least intermittent
Present Absent At least intermittent
Present Intermittent
Many (3+)
None Absent Absent Absent Need more information
Present At least intermittent
Present At least intermittent
Few (1-19)
Absent At least intermittent
Present Perennial
Many (20+)
Absent At least intermittent
Present Perennial
10/24/2023 PH1 519 of 2254

Field form for the beta Arid Streamflow Duration Assessment Method Revision Date December 8, 2020 Page 1 of 4

Beta Arid West Streamflow Duration Assessment Method
General site information
Project name or number: Tideline Kensho Residential Project

Site code or identifier: N/A

Assessor(s): Katie Laybourn

Waterway name: Unnamed Channel 2

Visit date: 7/20/2021

Current weather conditions (check one)
□ Storm/heavy rain
□ Steady rain
□ Intermittent rain
□ Snowing
□ Cloudy (___ % cover)
□ Clear/Sunny
Notes on current or recent weather
conditions (e.g., precipitation in previous
week): Hot, sunny weather and no
precipitation in the week prior to
delineation.

Coordinates at downstream end
(decimal degrees):

Lat (N): 33.195367 N

Long (W): -117.240182 W

Datum: NAD83

Surrounding land-use within 100 m (check one or two):
□ Urban/industrial/residential
□ Agricultural (farmland, crops, vineyards, pasture)
□ Developed open-space (e.g., golf course)
□ Forested
□ Other natural
□ Other: ____________________________________
Describe reach boundaries: The extent of channel 2 that runs through the project site begins in the central portion of the project site and runs approximately 43 linear feet east to a dirt road that runs along the eastern side of the project site.

Mean channel width (m)

2.25 feet (0.68 m)
Reach length (m):
40x width; min 40 m; max 200 m.
43 feet (13 m)
Enter photo ID, or check if completed
Attachment E, Photographs 6 through 8
Disturbed or difficult conditions (check all that apply):
□ Recent flood or debris flow
□ Stream modifications (e.g., channelization)
□ Diversions
□ Discharges
□ Drought
□ Vegetation removal/limitations
□ Other (explain in notes)
□ None
Notes on disturbances or difficult site conditions: Channel 2 may have been an historic stormwater flow path connected to Channel 1 but has been disturbed by mechanical earth moving or vehicles and is higher in elevation than Channel 1 and no longer appears to receive stormwater.

Observed hydrology:
__0____ % of reach with surface flow
___0___ % of reach with sub-surface or surface flow
___0___ # of isolated pools
Comments on observed hydrology: No surface water flow
observed during delineation.

Site sketch:

Western Reach (sampling point NW-5)
Eastern Reach (sampling point NW-6)

10/24/2023 PH1 520 of 2254

Field form for the beta Arid Streamflow Duration Assessment Method Revision Date December 8, 2020 Page 2 of 4

1. Hydrophytic plant species
Record up to 5 hydrophytic plant species (FACW or OBL in the Arid West regional wetland plant list) within the assessment area: within the channel or up to one half-channel width. Explain in notes if species has an odd distribution (e.g., covers less than 2% of assessment area, long-lived species solely represented by seedlings, or long-lived species solely represented by specimens in decline), or if there is uncertainty about the identification. Enter photo ID, or check if photo is taken.

Check if applicable: □No vegetation in assessment area □No hydrophytes in assessment area Species
Odd
distribution?Notes
Photo
ID
N/A
Notes on hydrophytic vegetation:All vegetation observed in and around Channel 2 were upland species 2 and 3. Aquatic invertebrates

2. How many aquatic
invertebrates are
quantified in a 15-minute
search?

3. Is there evidence of aquatic stages of EPT (Ephemeroptera, Plecoptera and Trichoptera)?
Yes / No
Number of
individuals
quantified:
(Do not
count
mosquitos)
□ None
□ 1 to 19
□ 20 +
Photo ID:___N/A___________Ephemeroptera larva
Image credit: Dieter Tracey
Plecoptera larva
Tracey Saxby
Trichoptera larva
Tracey Saxby
Notes on aquatic invertebrates:None observed

4. Algal Cover
Are algae found on the
streambed?
□ Check if all observed
algae appear to be deposited
from an upstream source.
□Not detected
□ Yes, <10% cover
□ Yes, ≥10%(check
Yes in single
indicator below)
Notes on algae cover:None observed Photo ID:

Photos 6
through 8

5. Are single indicators observed?
Indicator Present Notes Photo ID
Fish □ Yes
□No, no fish
□ No, only non-native mosquitofish
None observed Photos 6
through 8
Algae cover ≥ 10%□ Yes
□No
None observed Photos 6
through 8
Supplemental information E.g., aquatic or semi-aquatic amphibians, snakes, or turtles; iron-oxidizing bacteria and fungi; etc.
10/24/2023 PH1 521 of 2254

Field form for the beta Arid Streamflow Duration Assessment Method Revision Date December 8, 2020 Page 3 of 4

Photo log
Indicate if any other photos taken during the assessment Photo ID Description
Photos 6 through 8 Attachment E, Photographic Log

Additional notes about the assessment:

10/24/2023 PH1 522 of 2254

Field form for the beta Arid Streamflow Duration Assessment Method Revision Date December 8, 2020 Page 4 of 4

Classification: _____Ephemeral_________________

Shading provided to enhance readability by increasing the contrast between neighboring cells; empty cells indicate the classification will not change with additional information however it is recommended that all five indicators be measured and recorded during every assessment.

1. Hydrophytic
plant species

2. Aquatic
invertebrates

3. EPT
taxa

4. Algae 5. Single indicators
x fish present
x algae cover ≥ 10%
Classification
None
None Absent
Absent Absent Ephemeral
Present At least intermittent
Present Absent Need more information
Present At least intermittent
Few (1-19)
Absent
Absent Absent Need more information
Present At least intermittent
Present Absent Need more information
Present At least intermittent
Present At least intermittent
Many (20+)
Absent
Absent Absent Need more information
Present At least intermittent
Present Absent Need more information
Present At least intermittent
Present At least intermittent
Few (1-2)
None Absent Absent Absent Need more information
Present At least intermittent
Present At least intermittent
Few (1-19)
Absent Absent Intermittent
Present At least intermittent
Present At least intermittent
Many (20+)
Absent Absent Intermittent
Present At least intermittent
Present Absent At least intermittent
Present Intermittent
Many (3+)
None Absent Absent Absent Need more information
Present At least intermittent
Present At least intermittent
Few (1-19)
Absent At least intermittent
Present Perennial
Many (20+)
Absent At least intermittent
Present Perennial
10/24/2023 PH1 523 of 2254

Field form for the beta Arid Streamflow Duration Assessment Method Revision Date December 8, 2020 Page 1 of 4

Beta Arid West Streamflow Duration Assessment Method
General site information
Project name or number: Tideline Kensho Residential Project

Site code or identifier: N/A

Assessor(s): Katie Laybourn

Waterway name: Unnamed Channel 3

Visit date: 1/19/2023

Current weather conditions (check one)
□ Storm/heavy rain
□ Steady rain
□ Intermittent rain
□ Snowing
□ Cloudy (___ % cover)
□ Clear/Sunny
Notes on current or recent weather
conditions (e.g., precipitation in previous
week): Cool, sunny weather and less
than one inch of precipitation in the
week prior to delineation.

Coordinates at downstream end
(decimal degrees):

Lat (N): 33.196593 N

Long (W): -117.240733 W

Datum: NAD83

Surrounding land-use within 100 m (check one or two):
□ Urban/industrial/residential
□ Agricultural (farmland, crops, vineyards, pasture)
□ Developed open-space (e.g., golf course)
□ Forested
□ Other natural
□ Other: ____________________________________
Describe reach boundaries: Channel 3 enters the southeastern corner of the survey area and extends approximately 893 linear feet northwest along the eastern edge of the survey area where it ends in a disturbed upland area south of
Guajome Street. Channel 3 is connected to a larger concrete channel to the east that is directed through a stormwater culvert under Guajome Street.

Mean channel width (m)
[OHWM]
1 foot (0.91 m)
Reach length (m):
40x width; min 40 m; max 200 m.
893 feet (272 m)
Enter photo ID, or check if completed
Attachment E, Photographs 9 through 12
Disturbed or difficult conditions (check all that apply):
□ Recent flood or debris flow
□ Stream modifications (e.g., channelization)
□ Diversions
□ Discharges
□ Drought
□ Vegetation removal/limitations
□ Other (explain in notes)
□ None
Notes on disturbances or difficult site conditions: Channel 3 is an artificial, concrete-lined channel that was constructed to capture and direct stormwater flows away from the
SPRINTER transit right-of-way.

Observed hydrology:
__0____ % of reach with surface flow
___0___ % of reach with sub-surface or surface flow
___0___ # of isolated pools
Comments on observed hydrology: No surface water flow
observed during delineation.

Site sketch:

10/24/2023 PH1 524 of 2254

Field form for the beta Arid Streamflow Duration Assessment Method Revision Date December 8, 2020 Page 2 of 4

1. Hydrophytic plant species
Record up to 5 hydrophytic plant species (FACW or OBL in the Arid West regional wetland plant list) within the assessment area: within the channel or up to one half-channel width. Explain in notes if species has an odd distribution (e.g., covers less than 2% of assessment area, long-lived species solely represented by seedlings, or long-lived species solely represented by specimens in decline), or if there is uncertainty about the identification. Enter photo ID, or check if photo is taken.

Check if applicable: □No vegetation in assessment area □No hydrophytes in assessment area Species
Odd
distribution?Notes
Photo
ID
N/A
Notes on hydrophytic vegetation:All vegetation observed outside of the Channel 3 banks were upland species 2 and 3. Aquatic invertebrates

2. How many aquatic
invertebrates are
quantified in a 15-minute
search?

3. Is there evidence of aquatic stages of EPT (Ephemeroptera, Plecoptera and Trichoptera)?
Yes / No
Number of
individuals
quantified:
(Do not
count
mosquitos)
□ None
□ 1 to 19
□ 20 +
Photo ID:___N/A___________Ephemeroptera larva
Image credit: Dieter Tracey
Plecoptera larva
Tracey Saxby
Trichoptera larva
Tracey Saxby
Notes on aquatic invertebrates:None observed

4. Algal Cover
Are algae found on the
streambed?
□ Check if all observed
algae appear to be deposited
from an upstream source.
□Not detected
□ Yes, <10% cover
□ Yes, ≥10%(check
Yes in single
indicator below)
Notes on algae cover:None observed Photo ID:

Photos 9
through
12 5. Are single indicators observed?
Indicator Present Notes Photo ID
Fish □ Yes
□No, no fish
□ No, only non-native mosquitofish
None observed Photos 9
through 12
Algae cover ≥ 10%□ Yes
□No
None observed Photos 9
through 12
Supplemental information E.g., aquatic or semi-aquatic amphibians, snakes, or turtles; iron-oxidizing bacteria and fungi; etc.
10/24/2023 PH1 525 of 2254

Field form for the beta Arid Streamflow Duration Assessment Method Revision Date December 8, 2020 Page 3 of 4

Photo log
Indicate if any other photos taken during the assessment Photo ID Description
Photos 9 through 12 Attachment E, Photographic Log

Additional notes about the assessment:

10/24/2023 PH1 526 of 2254

Field form for the beta Arid Streamflow Duration Assessment Method Revision Date December 8, 2020 Page 4 of 4

Classification: _____Ephemeral_________________

Shading provided to enhance readability by increasing the contrast between neighboring cells; empty cells indicate the classification will not change with additional information however it is recommended that all five indicators be measured and recorded during every assessment.

1. Hydrophytic
plant species

2. Aquatic
invertebrates

3. EPT
taxa

4. Algae 5. Single indicators
x fish present
x algae cover ≥ 10%
Classification
None
None Absent
Absent Absent Ephemeral
Present At least intermittent
Present Absent Need more information
Present At least intermittent
Few (1-19)
Absent
Absent Absent Need more information
Present At least intermittent
Present Absent Need more information
Present At least intermittent
Present At least intermittent
Many (20+)
Absent
Absent Absent Need more information
Present At least intermittent
Present Absent Need more information
Present At least intermittent
Present At least intermittent
Few (1-2)
None Absent Absent Absent Need more information
Present At least intermittent
Present At least intermittent
Few (1-19)
Absent Absent Intermittent
Present At least intermittent
Present At least intermittent
Many (20+)
Absent Absent Intermittent
Present At least intermittent
Present Absent At least intermittent
Present Intermittent
Many (3+)
None Absent Absent Absent Need more information
Present At least intermittent
Present At least intermittent
Few (1-19)
Absent At least intermittent
Present Perennial
Many (20+)
Absent At least intermittent
Present Perennial
10/24/2023 PH1 527 of 2254

Attachment G. Geographic Information Systems Data
Can be provided upon request.

10/24/2023 PH1 528 of 2254

This page intentionally left blank.

10/24/2023 PH1 529 of 2254

Attachment H. Aquatic Resources Table

10/24/2023 PH1 530 of 2254

This page intentionally left blank.
10/24/2023 PH1 531 of 2254

:D
W
H
U
V
B
1 D
P
H
6W
D
W
H
&R
Z
D
U
G
L
Q
B
&
R
G
H

+
*
0 B
&
R
G
H

0 H
D
V
B
7 \
S
H

$
P
R
X
Q
W

8 Q
L
W
V
:D
W
H
U
V
B
7 \
S
H
/D
W
L
W
X
G
H

/
R
Q
J
L
W
X
G
H

/
R
F
D
O
B
:

D
W
H
U
Z
D
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
0 B
2 W
K
H
U
B
7 H
[
W)XQFB,B6HGLPHQWB7UDSSLQJ)XQFB,,B1XWULHQWB5HF\FOLQJ)XQFB,,,B3ROOXWDQWB0DQDJHPHQW)XQFB,9B5HWQWQB$WWHQXB)OGB:WUV)XQFB9B5XQRIIB6WRUDJH)XQFB9,B&RQWULEXWLRQBRIB)ORZ)XQFB9,,B([SRUWB2UJDQLFB0DWWHU)XQFB9,,,B([SRUWB)RRGB5VRXUFHV)XQFB,;B3URYB/LIHB&\FOHB'HSGQWŚ Ă
Ŷ
Ŷ
Ğ
ů

ϭ

>
/
&
K
Z
E
/

h
5,
9 (
5 ,
1 (
ƌ
Ğ
Ă
Ϭ͘
Ϭ
ϭ
ϱ
$&
5 (
(;
&
/
'
%

9 ,























%
X
H
Q
D

9 L
V
W
D

&
U
H
H
N

D
S
S
U
R
[






P
L
O
H

Q
R
U
W
K

1 2

1 2

1 2

/
&
K
Z
E
/

h
5,
9 (
5 ,
1 (
ƌ
Ğ
Ă
Ϭ͘
Ϭ
Ϭ
ϯ
$&
5 (
(;
&
/
'
%

9 ,

























%
X
H
Q
D

9 L
V
W
D

&
U
H
H
N

D
S
S
U
R
[






P
L
O
H

Q
R
U
W
K

1 2

1 2

1 2

/
&
K
Z
E
/

h
5,
9 (
5 ,
1 (
ƌ
Ğ
Ă
Ϭ͘
Ϭ
Ϯ
$&
5 (
(;
&
/
'
%

,

























%
X
H
Q
D

9 L
V
W
D

&
U
H
H
N

D
S
S
U
R
[






P
L
O
H

Q
R
U
W
K

1 2

1 2

1 2

1 2

<
(
6 <
(
6 1
2 1
2 1
2 <
(
6 1
2 1
2 1
2 1
2 <
(
6 1
2 1
2 1
2 1
2 1
2 1
2 1
2 12

1 2

1 2

1 2

1 2

<
(
6 1
21 2
1 2
10/24/2023 PH1 532 of 2254

This page intentionally left blank.
10/24/2023 PH1 533 of 2254

Attachment 3. Species Observed

10/24/2023 PH1 534 of 2254

This page intentionally left blank.

10/24/2023 PH1 535 of 2254

3ODQW6SHFLHV2EVHUYHG
Scientific Name Common Name Special Status
Jeffrey pine
Chilean sea fig*

GYMNOSPERMS
Pinaceae - Pine family
Pinus jeffreyi

EUDICOTS
Aizoaceae - Fig-Parigold family
Carpobrotus chilensis
Anacardiaceae - Sumac Rr &asheZIDPLO\
Schinus molle Peruvian pepper tree*
Schinus terebinthifolius Brazilian pepper tree*
Asteraceae - Sunflower family
Ambrosia psilostachya Western ragweed
Baccharis pilularis ssp. pilularis Coyote brush
Baccharis salicifolia ssp. salicifolia Mule fat
Baccharis sarothroides Broom baccharis
Erigeron sp.Daisy
Glebionis coronaria Crown daisy*
Helminthotheca echioides Bristly ox-tongue*
Heterotheca grandiflora Telegraph weed
Isocoma menziesii Coastal goldenbush
Pseudognaphalium californicum California everlasting
Silybum marianum Blessed milkthistle*
Sonchus asper ssp. asper Prickly sow thistle*
Sonchus oleraceus Common sow thistle*
Boraginaceae - Borage family
Amsinckia sp.Fiddleneck
Brassicaceae - Mustard family
Brassica nigra Black mustard*
Hirschfeldia incana Shortpod mustard*
Raphanus sativus Radish*
Sisymbrium irio London rocket*
Cactaceae - Cactus family
Opuntia ficus-indica Mission prickly pear*
10/24/2023 PH1 536 of 2254

Scientific Name Common Name Special Status
Big saltbush
Chenopodiaceae - Goosefoot IDPLO\
Atriplex lentiformis
Chenopodium murale Nettleleaf goosefoot*
Southern russian thistle
Morning-glory
Jade plant
Large fruit wild cucumber
Doveweed
Castorbean
Deerweed
Coast live oak
Redstem filaree
Whitestem filaree
Horehound
Blue hibiscus
Cheeseweed
*Salsola australis
Convolvulaceae - Morning-glory IDPLO\
Calystegia sp.

Crassulaceae - Stonecrop family
*Crassula ovata
Cucurbitaceae - Gourd family
Marah macrocarpa
Euphorbiaceae - Spurge family
*Croton setigerus
*Ricinus communis
Fabaceae - Legume family
Acmispon glaber
Fagaceae - Oak family
Quercus agrifolia
Geraniaceae - Geranium family
*Erodium cicutarium
*Erodium moschatum
Lamiaceae - Mint family
*Marrubium vulgare
Malvaceae - Mallow family
*Alyogyne huegelii
*Malva parviflora
Myrtaceae - Myrtle family
Red River gum*
Bougainvillea
Eucalyptus sideroxylon
Nyctaginaceae - Four O'clock IDPLO\
Bougainvillea sp.

Oxalidaceae - Oxalis family
Oxalis pes-caprae Bermuda buttercup*
Oxalis purpurea Purple wood-sorrel*
Papaveraceae - Poppy family
Eschscholzia californica California poppy

10/24/2023 PH1 537 of 2254

Scientific Name Common Name Special Status
California buckwheat
Polygonaceae - Buckwheatfamil\
Eriogonum fasciculatum
Solanaceae - Nightshade family
Datura wrightii Wright's jimsonweed
Tree tobacco
Garden nasturtium
Dwarf nettle
Lantana
*Nicotiana glauca
Tropaeolaceae - Nasturtium IDPLO\
*Tropaeolum majus
Urticaceae - Nettle family
*Urtica urens
Verbenaceae - Vervain family
*Lantana camara

MONOCOTS
Agavaceae - Century Plant family
Agave americana American century plant*
Agave attenuata Fox tail agave
Arecaceae - Palm family
Phoenix canariensis Canary Island palm*
Phoenix dactylifera Date palm*
Syagrus romanzoffiana Queen palm*
Washingtonia robusta Mexican fan palm*
Asparagaceae - Asparagus family
Asparagus asparagoides African asparagus fern*
Asphodelaceae - Asphodel family
Aloe maculata Spotted Aloe*
Cyperaceae - Sedge family
Cyperus involucratus Umbrella flatsedge*
Iridaceae - Iris family
Chasmanthe floribunda African cornflag*
Poaceae - Grass family
Arundo donax Giant reed*
Avena barbata Slender wild oat*
Cynodon dactylon Bermuda grass*
Hordeum sp.Barley
Pennisetum setaceum African fountain grass*

10/24/2023 PH1 538 of 2254

Scientific Name Common Name Special Status
Stipa miliacea var. miliacea Smilo grass*
Legend
Special Status:

Federal:

FE = Endangered
FT = Threatened
State:

SE = Endangered
ST =Threatened
*= Non-native or invasive species
CRPR – California Rare Plant Rank
1A. Presumed extinct in California and elsewhere
1B. Rare or Endangered in California and elsewhere
2A. Presumed extinct in California, more common elsewhere 2B. Rare or Endangered in California, more common elsewhere

3. Plants for which we need more information - Review list

4. Plants of limited distribution - Watch list
Threat Ranks
.1 - Seriously endangered in California
.2 – Fairly endangered in California
.3 – Not very endangered in California
10/24/2023 PH1 539 of 2254

Wildlife SpeciesKďƐĞƌǀĞĚ
Scientific Name Common Name Special Status

INVERTEBRATES
Moths, Skippers and Butterflies
*Pieris rapae Cabbage White
Brephidium exile Western Pygmy-Blue
Nymphalis antiopa Mourning Cloak
Danaus plexippus Monarch &͕SDC Group Ϯ

VERTEBRATES
Reptiles
Sceloporus occidentalis longipes Great Basin Fence Lizard Birds
Ardea herodias Great Blue Heron SDC Group Ϯ
Buteo lineatus Red-shouldered Hawk SDC Group Ϯ
Zenaida macroura Mourning Dove
Calypte anna Anna's Hummingbird
Selasphorus sasin Allen's Hummingbird
Picoides nuttallii Nuttall's Woodpecker
Sayornis saya Say's Phoebe
Tyrannus vociferans Cassin's Kingbird
Corvus brachyrhynchos American Crow
Corvus corax Common Raven
Poecile gambeli Mountain Chickadee
Thryomanes bewickii Bewick's Wren
Mimus polyglottos Northern Mockingbird
Oreothypis celata Orange-crowned Warbler
Setophaga coronata Yellow-rumped Warbler
Melozone crissalis California Towhee
Zonotrichia leucophrys White-crowned Sparrow
Icterus cucullatus Hooded Oriole
Haemorhous mexicanus House Finch
Passer domesticus House Sparrow
Mammals
Sylvilagus audubonii Desert Cottontail
Spermophilus beecheyi California Ground Squirrel
Ύ
10/24/2023 PH1 540 of 2254

Scientific Name Common Name Special Status
Thomomys bottae
Legend
*= Non-native or invasive species
Special Status:
&ĞĚĞƌĂů͗
& = &ĞĚĞƌĂƚĞĂŶĚŝĚĂƚĞĨŽƌ>ŝƐƚŝŶŐ
County:

SDC Group ϭ = includes animal species that have a very high level of sensitivity, either because they are listed as threatened or endangered or because they have very specific natural history requirements that must be met.

SDC Group Ϯ - includes animal species that are becoming less common, but are not yet so rare that extirpation or extinction is imminent without immediate action. These species tend to be prolific within their suitable habitat types.

KĚŽĐŽŝůĞƵƐŚĞŵŝŽŶƵƐ ^'ƌŽƵƉϮ
ĂŶŝƐĨĂŵŝůŝĂƌŝƐ
^ŽƵƚŚĞƌŶDƵůĞĞĞƌ
Botta's Pocket Gopher
ŽŵĞƐƚŝĐĚŽŐ
10/24/2023 PH1 541 of 2254

Attachment 4. Photographic Log

10/24/2023 PH1 542 of 2254

This page intentionally left blank.

10/24/2023 PH1 543 of 2254

!(&
!(&
!(&
!(
&
PRIVAT
E
RD
T
E
R
R
A
C
E
D
R
P
R
I
V
A
T
E

R
D
TER
R
A
C
E

D
R
P
R
I
V
A
T
E
R
D
G
U
A
J
O
M
E

S
T
G
U
A
J
O
M
E

S
T
PRI
V
A
T
E

R
D

LADO DE LOMA D
R
LADO

D
E

L
O
M
A

D
R
U
N
N
A
M
E
D

5 5
T
H

R
D
G
U
A
J
O
M
E

S
T
LA
D
O

D
E

L
O
MA

D
R

LADO DE LOMA DR
OCE
A
N

V
I
E
W CT
RHOD
A

L
N
S SA
N
T
A

F
E

A
V
E
MER
C
A
N
T
I
L
E

S
T
1 2
3 4
Date: 1/24/2023 - Last saved by: Randy.Deodat - Path: C:\GIS\Projects\City of Vista\Tideline Pheasant Hill\Map Docs\Bio\Bio Letter\Attachment4_PhotoLog.mxd Pr
o
j
e
c
t

S
i
t
e

P
h
o
t
o
g
r
a
p
h
i
c

L
o
g

L
o
c
a
t
i
o
n
s
So
u
r
c
e
:

S
a
n
G
I
S

I
m
a
g
e
r
y

2 0
1 7
.
±
At
t
a
c
h
m
e
n
t

4 01
50 75
Fe
e
t
Pr
o
j
e
c
t

S
i
t
e
Su
r
v
e
y

A
r
e
a
Of
f
-
S
i
t
e

I
m
p
r
o
v
e
m
e
n
t
s
!(&
Ph
o
t
o

L
o
c
a
t
i
o
n
s
Ti
d
e
l
i
n
e

K
e
n
s
h
o

R
e
s
i
d
e
n
t
i
a
l

P
r
o
j
e
c
t
10/24/2023 PH1 544 of 2254

Biological Resources Letter Report 4-2 May 2023
Tideline Kensho Residential Project

This page intentionally left blank.

10/24/2023 PH1 545 of 2254

Biological Resources Letter Report 4-3 May 2023
Tideline Kensho Residential Project
Central/Western Project Site

Photograph 1: (33.195493 N, −117.240097 W) Southwest-facing and up-slope view of the central and western portions of the Project site. This photo shows the disturbed habitat surrounding the non-vegetated Channels 1 and 2 in the foreground and the coast live oak woodland in the background.

Photograph 2: (33.194999 N, −117.240876 W) Northeast-facing and down-slope view of the central and western portions of the Project site. This photo shows the disturbed habitat surrounding the non-vegetated Channel 1 in the foreground and the coast live oak woodland in the right-hand-side background.

10/24/2023 PH1 546 of 2254

Biological Resources Letter Report 4-4 May 2023
Tideline Kensho Residential Project
Southern Project Site

Photograph 3: (33.194887 N, −117.239800 W) East-facing view of the southern portion of the Project site. This photo shows the disturbed habitat in the foreground and the recreational vehicle (RV) in the background.

Photograph 4: (33.194857 N, −117.239358 W) Northwest-facing view of the southern portion of the Project site. This photo shows the Rhoda Lane dirt road in the foreground, non-native grassland in the right-hand-side background, and the RV and associated storage shed in the left-hand-side background.

10/24/2023 PH1 547 of 2254

City of Vista Attachment E – Cultural Resources Survey Letter Report Tideline Kensho Residential Project – IS/MND P-22-0282 August 2023

Attachment E – Cultural Resources Survey Letter Report

10/24/2023 PH1 548 of 2254

City of Vista Attachment E – Cultural Resources Survey Letter Report Tideline Kensho Residential Project – IS/MND P-22-0282 August 2023

This page left intentionally blank.
10/24/2023 PH1 549 of 2254

CULTURAL RESOURCES SURVEY LETTER REPORT –

POSITIVE FINDINGS

Tideline Kensho Residential Project

Lead Agency:

City of Vista
Community Development Department
Planning Division
Patsy Chow, City Planner
200 Civic Center Drive
Vista, CA 92084-6275
(760) 643-5390

Preparer:

Donna Beddow, RPA
Harris & Associates
600 B Street, Suite 2000
San Diego, CA 92101
(619) 236-1778

Project Proponent:

Tideline Partners
Lev Gershman
2148 Jimmy Durante Boulevard, Suite B
Del Mar, CA 92014

May 2023

10/24/2023 PH1 550 of 2254

National Archaeological Data Base Information

Authors: Donna Beddow and Yliana Ortega

Firm: Harris & Associates
600 B Street, Suite 2000
San Diego, CA 92101
(619) 236-1778

Client/Project Proponent: Tideline Partners
Lev Gershman
2148 Jimmy Durante Boulevard, Suite B
Del Mar, CA 92014

Report Date: May 2023

Report Title: Cultural Resources Survey Report – Positive Findings for the Tideline Kensho Residential Project

Type of Study: Intensive Pedestrian/Phase I

New Sites: I-TPH-1, TPH-1, TPH-2

Updated Sites: P-37-036435

USGS Quad: San Marcos

Acreage: 5.02 acres

Key Words: Historic, Isolate, Glass Fragment, P-37-036435, I-TPH-1, Single-Family Residence

10/24/2023 PH1 551 of 2254

Cultural Resources Survey Letter Report – Positive Findings 1 May 2023 Tideline Kensho Residential Project
May 2023

Tideline Partners
Attn: Lev Gershman
2148 Jimmy Durante Boulevard, Suite B
Del Mar, CA 92014

RE: Cultural Resources – Positive Findings; Tideline Kensho Residential Project

Mr. Gershman:

Please be advised that a survey has been conducted on the above referenced Project. It has been determined that cultural resources are present on this property. The Project has been plotted on the attached U.S. Geological Survey (USGS) 7.5-minute topographical map for your information.

County: San Diego
USGS 7.5’ Quad: San Marcos; Date: April 2022
Section: 19 and 30; Township: 11S Range: 03W; Land Grant: Buena Vista Address: Lado De Loma Drive (east of Guajome Street), 446 Lado De Loma Drive, 212 Guajome Street, Guajome Street from Eddie Drive to the northern side of the Project site (off-site improvements area)
City: Vista; State: California
Thomas Brothers: 1087/H7
Other Locational Data: The Project site is accessible from Interstate 5 by taking exit 51B onto State Route 78 East. Travel six miles east, then take exit 6B onto Vista Village Drive. Turn left onto Mar Vista Drive, then in 0.2 mile, turn right onto Lado de Loma Drive. In 0.6 mile, the Project site is on the eastern side of Lado De Loma Drive.

Assessor Parcel Number(s): 179-024-09, 179-093-05, 179-093-09, 179-093-18, 179-093-23, 179- 093-30, 179-093-32, and 179-093-34

UTMs: 11S; í117.240744 mN/33.196475 mE taken from northeastern corner of Project site Elevation: The on-site elevation ranges from approximately 108 feet to 129 feet above mean sea level.

Owner and Address: Tideline Partners
2148 Jimmy Durante Boulevard, Suite B
Del Mar, CA 92014

Survey Type: Intensive Pedestrian/Phase I
Date of Survey: July 19, 2021, and February 3, 2022
Field Crew: Donna Beddow, Natane Mojado, Jessica Alexander

10/24/2023 PH1 552 of 2254

Cultural Resources Survey Letter Report – Positive Findings 2 May 2023 Tideline Kensho Residential Project

BACKGROUND
Environmental

The proposed Tideline Kensho Residential Project (Project) site is southwest of the intersection of Guajome Street and South Santa Fe Avenue; Lado De Loma Drive is along the Project site’s western boundary (Figure 1, Regional Location). The approximately 5-acre Project site is primarily undeveloped open space, with a dirt road (Rhoda Lane) running along the eastern side of the Project site parallel to the SPRINTER tracks (Figure 2, Project Site). The project site was previously approved for 24 single-family dwelling units as a part of the Pheasant Hill Specific Plan; however, the current Project proposes the development of 183 dwelling units. The site would be rezoned out of the Pheasant Hill Specific Plan and into the Downtown Vista Specific Plan (DVSP) and would also include a General Plan amendment, a zoning change, a Site Development Plan, and a Tentative Parcel Map. The Project would include three three-story buildings and one four-story building with covered parking included in three of the four buildings. The Project also proposes off-site sidewalk improvements along the northern side of Guajome Street from Eddie Drive to the northern side of the Project site (i.e., the off-site improvements area).

The majority of the Project site is undeveloped and has one single-family residence (SFR) in the northern portion of the Project site and a second SFR in the southern portion of the Project site.

The Project site is currently designated as Medium Density Residential (MD) with a maximum of ten dwelling units per acre in the city of Vista. The increase in density would require a General Plan Amendment and rezone, in addition to other entitlements.

The Project site is along the eastern side of Lado De Loma Drive (Assessor’s Parcel Numbers [APNs] 179-093-05, -09, -18, -23, -30, -32, and -34) and southern side of Guajome Street (179-024-09) in the city of Vista, California (Figures 1 and 2). The Project site is in a portion of the city containing both residential and commercial development. A single-family residential neighborhood borders the Project site from the northwest to the southeast, while the SPRINTER light-rail line borders the remaining sides of the site. On the other side of the SPRINTER tracks is commercial development. On the other side of the tracks is commercial development. The Project site has historically been disturbed with mowing and other mechanical disturbances, including repeated vehicle use through the center of the Project site. The on-site elevation ranges from approximately 108 feet to 129 feet above mean sea level and is in the 7.5-Minute San Marcos Quadrangle, Township 11 South, Range 3 West, Sections 19 and 30.

The cultural investigation described in this letter report was implemented to support the City of Vista’s responsibilities under the California Environmental Quality Act (CEQA) to incur no significant impacts to cultural resources resulting from the Project.

Cultural Setting

Prehistoric
Cultural resources are found throughout San Diego county and are reminders of the county’s 10,000- year-old historical record. Cultural resources are the tangible or intangible remains or traces left by prehistoric or historical people who inhabited the San Diego region. They encompass both the built (post-1769) and the archaeological environments, as well as Traditional Cultural Properties. They 10/24/2023 PH1 553 of 2254

Cultural Resources Survey Letter Report – Positive Findings 3 May 2023 Tideline Kensho Residential Project
are typically in protected areas near water sources and multiple ecoregions and can include Traditional Cultural Places, such as gathering areas, landmarks, and ethnographic locations.

The following provides a brief cultural background for San Diego county.

Paleoindian Period (pre-5500 BC)
Several terms are used for the early occupation of the Riverside region and include Paleoindian period, Early Archaic period, Initial period, and Scraper Maker period (Moratto 1984). This period dates from 9000 to 5500 BC (Chartkoff and Chartkoff 1984; Moratto 1984; Rogers 1966; Taylor and Meighan 1978; Warren and True 1961). Early humans have been characterized as an early nomadic, hunting culture whose settlements were located on mesas and ridge tops and in deserts (Erlandson and Colton 1991; Rogers 1966; Wallace 1978; Warren et al. 1961). During this period, inhabitants relied on large game for subsistence (Rogers 1966; Warren et al. 1961) and produced “finely worked blades, spear points, choppers, and scrapers out of fine-grained volcanics” (Carrico 1977). In addition, leaf-shaped knives, foliate to ovoid bifaces, foliate to short-bladed shoulder points, crescents, engraving tools, core hammers, pebble hammers, and cores were part of the tool assemblage (Moratto 1984; Wahoff and Dolan 2000). Pottery and milling stones were missing from the assemblage, confirming the assumption that hunting was an economic focus for the culture (Moriarty 1967; Warren and True 1961). Because the tool assemblage was similar to desert cultures of the Mojave Desert, it is believed that this culture migrated west from the desert into California (Gallegos 1995; Rogers 1939). However, no single hypothesis is universally accepted.

Other hypotheses identify the movement of people into California from the south and north down the coast (Taylor and Meighan 1978; Chartkoff and Chartkoff 1984).

Archaic (8000 BC–AD 500)
According to Hale et al. (2018), “the more than 1500-year overlap between the presumed age of Paleoindian occupations and the Archaic period highlights the difficulty in defining a cultural chronology in the San Diego region.” The Archaic period is also known as La Jollan, Millingstone Horizon, and Encinitas Tradition. This period is characterized by the presence of dart points, milling, equipment, scattered hearths, shell middens, and flexed burials (Carrico 1977).

Subsistence strategies placed an emphasis on gathering, possibly as a result of environmental change (Wahoff and Dolan 2000; Wallace 1978). The assemblage was composed of milling implements and cobble/core-based tools. The flaked tools do not appear to be as refined as those of the Paleoindian period. Mortuary goods included shell beads and ornaments, projectile points, and milling implements. Wallace (1978) interpreted archaeological sites of this period as an indication of an increase in population and permanence. Site types included coastal shell habitation bases, quarries, resource exploitation, and milling (Gallegos 1995). The sites are typified by an abundance of shellfish remains and are situated near sloughs and lagoons and on the open coast (Carrico 1977; Masters and Gallegos 1997; Moratto 1984; Wallace 1978). An inland manifestation identified as the Pauma complex is known to have existed (True 1958). Unlike the coastal people, this complex occupied “transverse valleys and sheltered canyons of inland San Diego county, ha[d] an emphasis on hunting and gathering, had a greater diversity of tool types, and lacked shellfish remains” (Masters and Gallegos 1997:12).

Similar to the Paleoindian period, controversy surrounds the origins of the Archaic culture. Several hypotheses have been postulated. Kaldenberg (1976) and Moriarty (1967) proposed that the transition from the Paleoindian to the Archaic culture was an in situ adaptation. In contrast, Warren 10/24/2023 PH1 554 of 2254

Cultural Resources Survey Letter Report – Positive Findings 4 May 2023 Tideline Kensho Residential Project
et al. (1961) viewed this transition as a migration from the desert to the coast due to the adverse environmental condition of the Altithermal. Taylor and Meighan (1978:36) did not take a single position regarding the transition to the Archaic culture but, rather, incorporated all of the hypotheses as identified below:

The artifact inventory and cultural activities argue strongly that this stage began in the desert inland and spread toward the Pacific Coast, reaching it about 8500 years ago. There is no evidence to show whether the Milling Stone Stage involved movement of the people or a conquest of earlier residents; perhaps the early hunters simply adopted this way of life as game animals became scarce.

The population of this period focused on lagoonal resources and moved up and down the river valleys exploiting a variety of inland and coastal resources (Masters and Gallegos 1997).

Late Prehistoric (AD 500–1769)
The Late Prehistoric period is an antecedent to Spanish contact (AD 1000–1769). It was a “time of cultural transformations brought about by trait diffusion, immigration, and in-situ adaptation to environmental changes” (Moratto 1984:153). Subsistence strategies involved a focus on terrestrial collection and hunting (Christenson 1992); however, shellfish and other maritime resources were also used. Settlement included large villages near permanent water sources, temporary campsites, quarries, and resource exploitation sites. Small triangular points, pottery, and Obsidian Butte obsidian are characteristic of this period (Christenson 1992; Masters and Gallegos 1997; True 1966, 1970). Cremations replaced flexed inhumations, and mortuary goods became more elaborate (Wallace 1955). Cremations are believed to have been introduced into the area during the Late Prehistoric period and are the result of Shoshonean intrusion (1500 BP) from the deserts (True 1966) into northern San Diego county. However, in the southern part of the county, this practice has been attributed to a “Colorado River origin that may have had an influence as far reaching as the Hohokam [current day Pima people and Tohono O’odham Nation] in southwestern Arizona” (True 1970:58). Kaldenberg (1976:67) had a different opinion on the origin and timing of the entrance of cremation practices into the region. He noted that the practice of cremation was introduced at the terminus of the Archaic culture (3000 BP) with the “migration of Yuman people into the San Diego coastal region.” By 2000 BP, inhumations were replaced by cremations (Kaldenberg 1976).

Two complexes (San Luis Rey and Cuyamaca) are identified with the Late Prehistoric period. True (1966) believed that the San Luis Rey complex was a precursor to the ethnographic Luiseño.

Similarly, he suggested that the Cuyamaca complex was the predecessor to the ethnographic Kumeyaay. Through the examination of both geographic regions, True identified specific characteristics unique to each; however, he noted that, although geographically similar, these two cultures were distinctly different.

Ethnohistoric Period (post-AD 1769)
The Ethnohistoric period begins with the first permanent European settlements. Early Ethnohistoric accounts and mission documents have been used to reconstruct this period (Hale et al. 2018). Florence Shipek (1993) delineated the boundaries between the Luiseño and the Kumeyaay as follows:

10/24/2023 PH1 555 of 2254

Cultural Resources Survey Letter Report – Positive Findings 5 May 2023 Tideline Kensho Residential Project
In 1769, the Kumeyaay national territory started at the coast about 100 miles south of the Mexican border (below Santo Tomas), thence north to the coast at the drainage divide south of the San Luis Rey River including its tributaries. Using the U.S.

Geological Survey topographic maps, the boundary with the Luiseño then follows that divide inland. The boundary continues on the divide separating Valley Center from Escondido and then up along Bear Ridge to the 2240 contour line and then north across the divide between Valley Center and Woods Valley up to the 1880-foot peak, then curving around east along the divide above Woods Valley.

The Kumeyaay (also known as Ipai, Tipai, Diegueño, and Kamia) lived in small villages, or rancherias, and would inhabit multiple locations throughout the year. According to Cline (1984), the typical settlement included two or more seasonal villages with temporary camps farther away from the main central villages. Hunting and gathering were the main economic focus, consisting of small game, acorns, grass seeds, and other plant resources. Similar to the Prehistoric period, a wide range of tools (chipped and ground stone) that were made from locally available materials were used. Exotic materials, such as obsidian and chert, were imported from the deserts to the north and east. In addition to lithic tools, the Kumeyaay produced baskets and pottery.

Historical Period (post-AD 1542)
The Historical period can be divided into three phases (Spanish, Mexican, and American). Each phase is identified with a change in political power. Common goals in each phase included land gain, assimilation of the native population, and the attainment of wealth. However, these periods were dissimilar in the rationale behind these goals. Rationale included defense (Spain), independence and secularization (Mexico), and expansion and economics (United States).

Assimilation of Native Californians was a desire of each government that came to power; however, the greatest misfortune of this period was the large decline in Native American populations (Phillips 1981).

Spanish Period (AD 1769–1821)
Although the first Spanish contact occurred in 1542, it was not until 1769 that the first permanent settlement was established. The Spanish period was a time of European expansionism and is typically identified with the mission system. In addition, presidios (military defense) and pueblos (city government) played an important role in the structuring of the community (Campbell 1977).

The mission system was the institution designated for the assimilation and exploitation of native people (Campbell 1977; Cline 1979; Jackson and Castillo 1995; Phillips 1981). Jackson and Castillo (1995:6) identified this exploitation as an extension of the “sixteenth-century policy of congregacion/reduction.” In contrast, Costo (1987) noted that the transference of the Spanish Inquisition (originally established in 1478) to the New World that was the mechanism for this exploitation because the Inquisition contained economic and religious incentives. The Spanish stronghold in California declined with Spain’s loss of the Napoleonic Wars (1803–1815), which eliminated funding to the mission.

Mexican Period (AD 1821–1859)
Mexican independence from Spain occurred in 1821, and in 1833, Mexico secularized the missions. After secularization, large tracts of land were granted to private citizens. “The secularization of the missions during the Mexican period is usually regarded as a watershed in California History because it resulted in the replacement of one Hispanic institution by another – 10/24/2023 PH1 556 of 2254

Cultural Resources Survey Letter Report – Positive Findings 6 May 2023 Tideline Kensho Residential Project
the rancho for the mission” (Phillips 1981:33). Like the mission, the rancho became the institution of native exploitation. This period experienced an increase in cattle ranching and the hide and tallow trade (Gallegos 1995; Wahoff and Dolan 2000). The passage of the Treaty of Guadalupe Hidalgo that ended the Mexican–American War in 1848 was the final event that culminated the Mexican period in California.

American Period (Post-AD 1850)
The concept of a two-ocean economy and the California Gold Rush were the impetus that brought about the annexation of California (1850) to the United States. A large number of immigrants entered California with the discovery of gold and the availability of free land with the passage of the Homestead Act (1863). This population increase caused the displacement of Native Californians and brought about a deterioration in their rituals and traditions (Carrico 1986; Gallegos 1995). During this period, the ranchos experienced a decline primarily in response to their inability to validate land ownership as a result of the California Land Claims Act of 1851. “With the discovery of gold, the building of the transcontinental railroad, and the development of crops and cities, people in massive numbers from all parts of the world began to inhabit the region” (Phillips 1981: editors’ introduction).

METHODS, REGULATORY SETTING, ANALYSIS OF PROJECT EFFECTS,

AND RECOMMENDATIONS

Description
An intensive pedestrian (Phase I) survey was conducted to relocate known cultural resources (P-37-036435) and to determine if additional resources are present. The pedestrian survey satisfies Mitigation Measure CUL-1 as identified in the Downtown Vista Specific Plan Update Program Environmental Impact Report (DVSP PEIR). Requirements of Mitigation Measure CUL-1 are provided below:

CUL-1: Prior to the issuance of a grading permit for any future development in the SPA [Specific Plan Area] proposed on an undeveloped parcel, a pedestrian survey shall be conducted by a professional archaeologist approved by the City. Should the pedestrian survey identify cultural resources, the cultural resources shall be evaluated for eligibility to the California Register of Historic[al] Resources (CRHR) prior to issuance of a grading permit. In addition, the Native American Heritage Commission (NAHC) and local tribes shall be consulted regarding the potential for impacts to cultural sites to occur on the SPA. Finally, the survey shall make a determination whether the potential presence of subsurface resources requires archaeological or Native American monitoring during site grading. If construction monitoring is required, Mitigation Measure CUL-2 shall be implemented. [Mitigation Measure CUL-2 is discussed in the Recommendations section of this report.]

Project Implementation of DVSP Mitigation Measure CUL-1: The proposed Project has implemented Mitigation Measure CUL-1 from the DVSP by completing an intensive pedestrian survey of the Project site.

10/24/2023 PH1 557 of 2254

Cultural Resources Survey Letter Report – Positive Findings 7 May 2023 Tideline Kensho Residential Project
On July 19, 2021, Donna Beddow, Harris & Associates senior archaeologist, and Natane Mojado, Luiseño Native American monitor of Saving Sacred Sites, conducted an intensive pedestrian survey. As a result, P-37-036435 was not relocated; however, one new isolate (I-TPH-1) was identified. An additional survey was conducted on February 3, 2022, for the properties at 212 Guajome Street and 446 Lado De Loma Drive that were added to the Project (APNs 179-024-09 and 179-093-05, respectively). The additional survey was conducted by Donna Beddow, Harris & Associates senior archaeologist, and Jessica Alexander, Luiseño Native American monitor of Saving Sacred Sites. The off-site improvements area was not surveyed because it is developed with paved roadways and sidewalks. As such, there is no visibility of surficial resources. Archaeological and Tribal monitoring, which would identify any resources during Project development, are recommended.

Prior Research
Staff conducted a records search of the surrounding area using the California Historic Resources Inventory System (CHRIS) (Confidential Appendix B, CHRIS Background Data). Twenty-nine studies (Table 1, Previous Studies within a 0.25-Mile Radius) have been conducted within a half- mile radius, ten sites (Table 2, Previously Recorded Cultural Resources within a 0.25-Mile Radius) were previously recorded, and 20 historic addresses were identified (Table 3, Previously Recorded Historic Addresses within a 0.25-Mile Radius). Of the previously recorded sites, one is prehistoric (CA-SDI-646/P-37-000646), and nine are historic (CA-SDI-14324/P-37-015575; -028764, -028766, -028772/CA-SDI-23083, -028773, -028775, -028778, -033557, -036435). Of the 20 historic addresses that were identified, none are on or adjacent to the Project site.

One previously recorded site (P-37-036435) is within the Project footprint. The nearest off-site resource to the Project site is approximately 0.10 mile south (P-37-000646). P-37-036435 was originally recorded by HELIX Environmental Planning in 2017 as a historic refuse deposit within an eroded drainage that was likely deposited between 1930 and 1980.

Table 1. Previous Studies within a 0.25-Mile Radius
Report ID Title Author Year
SD-00746 An Archaeological Survey Of The Buena Vista Creek Relief Trunk Sewer Line, In The City Of Vista, California (E-77-89) Chace, Paul G. 1977 SD-01107 An Environmental Impact Report (Archaeology) For Centurion International
Loughlin, Barbara A. and
Sheila D. Neiswender 1974
SD-02916
Cultural Resources Assessment Of AT&T’S Proposed San
Bernardino To San Diego Fiber Optic Cable, San Bernardino, Riverside And San Diego Counties, California
Peak & Associates, Inc. 1990
SD-03075
Historic Property Survey Report For The State Route 78 Corridor Enhancement Project II-SD-78, P.M. 5.3-9.8, 965100, City Of Vista, California
Carrico, Richard, Andrew
Pigniolo, Brian Glenn, and
Kathleen Crawford
1995
SD-04115 Environmental Impact Report Ocean View - Terrace Drive General Plan Amendment, Vista, California The City Of Vista 1978 SD-04116 Environmental Impact Report For The Rancho Vista Area The City Of Vista 1978 SD-04175 Cultural Resource Evaluation Report For The Oceanside- Escondido Bikeway Project San Marcos, California
Gallegos, Dennis R. and
Sinead Ni Ghabhlain PhD 1999
SD-05078 Cultural Resources Inventory For The Taylor Street Extension and Escondido Ave. Extension, Vista, San Diego County, California Robbins-Wade, Mary 2001 10/24/2023 PH1 558 of 2254

Cultural Resources Survey Letter Report – Positive Findings 8 May 2023 Tideline Kensho Residential Project
Table 1. Previous Studies within a 0.25-Mile Radius
Report ID Title Author Year
SD-05577 Stephen’s Property Cultural Resources Survey Robbins-Wade, Mary 2001 SD-07274
Historic Property Survey Report For The State Route 78 Corridor Enhancement Project 11-SD-78, P.M. 5.3-9.8, 965100 City Of Vista, California
Carrico, Richard 1995
SD-09546 Cultural Resource Test Report For Oceanside-Escondido Rail Project Oceanside, California
Guerrero, Monica,
Gallegos, Dennis, Stropes,
Tracy, Bouscaren, Steve,
Bugbee, Susan, and
Cerreto, Richard
2001
SD-10551 Cultural Resources Final Report Of Monitoring And Findings For The Qwest Network Construction Project, State Of California Arrington, Cindy 2006 SD-11228 Historic Resource Survey, A Project Of The City Of Vista, California Marben-Laird Associates 1987 SD-11388 Archaeological Resources Survey, Vale View Drive Subdivision, Vista, San Diego County, California PC2-098
Robbins-Wade, Mary and
Andrew Giletti 2007
SD-11524 A Cultural Resources Evaluation For The Vista And Buena Sanitation District 2007 Sewer Master Plan Update
Rosenberg, Seth A.,
Adriane Dorrler, and Brian
F. Smith
2007
SD-12008 Vista Inland Rail Trail Archaeological Survey Robbins-Wade, Mary 2008 SD-12039
Cultural Resources Monitoring Report For The North County Transit District (NCTD) Sprinter Rail Project Oceanside To Escondido, California
Guerrero, Monica and
Dennis R. Gallegos 2007
SD-14081 Cultural And Historical Resources Survey For The Downtown Vista Specific Plan Update Program Environmental Impact Report Ni Ghabhlain, Sinead 2009 SD-15603
Cultural Resource Assessment Class Iii Inventory, Verizon Wireless Services, Vista Village Facility, City Of Vista, County Of San Diego, California
Phil Fulton 2014
SD-16540 Historic American Buildings Survey Documentation American Legion Building Post 365
Pumphrey, Michael P.,
Davis, Shannon, and Krintz,
Jennifer
2010
SD-16990 Carpenters Hall 353 East Broadway Vista California Historical Assessment
Van Wormer, Stephen and
Walter, Susan D. 2016
SD-17123 Cultural Resources Monitoring Report For The Vista Creekside Apartments Project, City Of Vista, San Diego County, California Smith, Brian F. 2017 SD-17233 San Diego 129 Project, San Diego County, California (BCR Consulting Project No. SYN1622) Brunzell, David 2017
SD-17235 T-Mobile PUC Project 365239, San Diego County, California (BCR Consulting Project No. SYN1620) Brunzell, David 2017 SD-17340 Pheasant Hill - Cultural Resources Survey And Testing Robbins-Wade, Mary and Kristina Davison 2017
SD-17951
Cultural Resources Review For The SD34XC785 Stealth Tower Project, 171 Unity Way (APP: 164-250-17-00), City Of Vista, San Diego County, California: No Historic Properties Located Within The Ape For Direct Effect And No Adverse Effect On Historic Properties Neal, Jessica and Kirby
Page-Schmit 2018
10/24/2023 PH1 559 of 2254

Cultural Resources Survey Letter Report – Positive Findings 9 May 2023 Tideline Kensho Residential Project
Table 1. Previous Studies within a 0.25-Mile Radius
Report ID Title Author Year
SD-17952
Cultural Resources Review For The SD34XC785 Project, 171 Unity Way, City Of Vista, San Diego County, California: No Historic Properties Located Within The Area Of Potential Effects For Direct Or Visual Effects
Tactikos, Joanne, Jessica
Neal, and Kirby Page-
Schmit
2019
SD-18576 Cultural Resources Monitoring Compliance Report Paseo Pointe Affordable Housing Project, City Of Vista, San Diego County, California Simmons, Andre and
Courtney Richards 2014
SD-19029 Summary Of Cultural Resources Monitoring For The Vista Village Drive Trunk Sewer Project, CIP 8212, City Of Vista, San Diego County O’Connor, John 2020

Table 2. Previously Recorded Cultural Resources within a 0.25-Mile Radius Primary
Number Trinomial
Chronological
Placement Site Type Size
P-37-000646 CA-SDI-646 Prehistoric BRM 7.5x15 feet
P-37-015575 CA-SDI-14324 Historic Concrete Foundations
(n=2)
125x30 feet
P-37-028764 N/A Historic Structure – Vista First
National Bank
N/A
P-37-028766 N/A Historic Structure – Red Barn 0.21 acre P-37-028772 CA-SDI-23083 Historic Structure – Avo
Theater

0.6 acre
P-37-028773 N/A Historic Structure – American
Legion Post #365

0.69 acre
P-37-028775 N/A Historic Structure – Dutch
Bakery

0.5 acre
P-37-028778 N/A Historic Structure – Sheffield’s
Department Store

0.9 acre
P-37-033557 N/A Historic Road – Hwy 395 -
Abandoned
190x20 feet
P-37-036435 N/A Historic Refuse Deposit 2.2mx100 cm
Notes: BRM = bedrock milling; N/A = not available
Table 3. Previously Recorded Historic Addresses within a 0.25-Mile Radius Primary Number1 Address Historic Name Common Name
N/A1 200 East Broadway — —
N/A1 217 East Broadway — —
N/A1 365 East Broadway — —
N/A1 160 Recreation Drive — —
N/A1 0 Santa Fe Avenue — —
P-37-028766 137 North Santa Fe Avenue Red Barn Bittners Restaurant Equipment
N/A1 240 North Santa Fe Avenue — —
P-37-028773 321 South Santa Fe Avenue American Legion Post #365 American Legion Post #365 N/A1 123 East Vista Way — —
10/24/2023 PH1 560 of 2254

Cultural Resources Survey Letter Report – Positive Findings 10 May 2023 Tideline Kensho Residential Project
Table 3. Previously Recorded Historic Addresses within a 0.25-Mile Radius Primary Number1 Address Historic Name Common Name
P-37-028764 211 East Vista Way Vista First National Bank Union Bank P-37-028778 224 East Vista Way Sheffield’s Department Store Jazzercize P-37-028775 226 East Vista Way Dutch Bakery Josie’s Mexican Restaurant N/A1 240 East Vista Way — —
P-37-028772 303 East Vista Way Avo Theater Avo Theater
N/A1 100 West Vista Way — —
N/A1 156 West Vista Way — —
N/A1 202 West Vista Way — —
N/A1 216 West Vista Way — —
N/A1 220 West Vista Way — —
N/A1 260 West Vista Way — —
Notes: N/A = not available
1 No primary numbers provided.

No historic addresses occur on the project site.

Applicable Regulations

Cultural resource regulations that apply to the Project site are CEQA, California Health and Safety Code, and provisions of the CRHR. Historic and archaeological districts, sites, buildings, structures, and objects are assigned significance based on their exceptional value or quality in illustrating or interpreting the heritage of San Diego county in history, architecture, archaeology, engineering, and culture. A number of criteria are used in demonstrating resource importance.

State Level Regulations

California Environmental Quality Act
According to CEQA, a resource shall be considered by the lead agency to be “historically significant” if the resource meets the criteria for listing on the CRHR (California Public Resources Code, Section 5024.1; 14 CCR 4852) including the following:

1. Is associated with events that have made a significant contribution to the broad patterns of California’s history and cultural heritage;

2. Is associated with the lives of persons important in our past;

3. Embodies the distinctive characteristics of a type, period, region, or method of construction, or represents the work of an important creative individual, or possesses high artistic values; or

4. Has yielded, or may be likely to yield, information important in prehistory or history.

The fact that a resource is not listed in or determined to be eligible for listing in the CRHR, not included in a local register of historical resources (pursuant to Section 5020.1(k) of the California Public Resources Code), or not identified in an historical resources survey (meeting the criteria in Section 5024.1[g] of the CEQA Guidelines) does not preclude a lead agency from determining 10/24/2023 PH1 561 of 2254

Cultural Resources Survey Letter Report – Positive Findings 11 May 2023 Tideline Kensho Residential Project
that the resource may be an historical resource as defined in California Public Resources Code, Section 5020.1(j) or 5024.1.

California Register of Historical Resources (California Public Resources Code, Section 5020 et seq.) In California, the term “historical resource” includes but is not limited to “any object, building, structure, site, area, place, record, or manuscript which is historically or archaeologically significant, or is significant in the architectural, engineering, scientific, economic, agricultural, educational, social, political, military, or cultural annals of California” (California Public Resources Code, Section 5020.1[j]). In 1992, the California legislature established the CRHR “to be used by state and local agencies, private groups, and citizens to identify the state’s historical resources and to indicate what properties are to be protected, to the extent prudent and feasible, from substantial adverse change” (California Public Resources Code, Section 5024.1[a]). A resource is eligible for listing in the CRHR if the State Historical Resources Commission determines that it is a significant resource and that it meets any of the following National Register of Historic Places (NRHP) criteria (California Public Resources Code, Section 5024.1[c]):

1. Associated with events that have made a significant contribution to the broad patterns of California’s history and cultural heritage.

2. Associated with the lives of persons important in our past.

3. Embodies the distinctive characteristics of a type, period, region, or method of construction, or represents the work of an important creative individual, or possesses high artistic values.

4. Has yielded, or may be likely to yield, information important in prehistory or history.

Resources less than 50 years old are not considered for listing in the CRHR but may be considered if it can be demonstrated that sufficient time has passed to understand the historical importance of the resources (see 14 CCR 4852[d][2]).

The CRHR protects cultural resources by requiring evaluations of the significance of prehistoric and historical resources. The criteria for the CRHR are nearly identical to those for the NRHP, and properties listed or formally designated as eligible for listing on the NRHP are automatically listed on the CRHR, as are the state landmarks and points of interest. The CRHR also includes properties designated under local ordinances or identified through local historical resource surveys. The State Historic Preservation Officer maintains the CRHR.

California Health and Safety Code, Section 7050.5
California law protects Native American burials, skeletal remains, and associated grave goods, regardless of their antiquity, and provides for the sensitive treatment and disposition of those remains. California Health and Safety Code, Section 7050.5, requires that, if human remains are discovered in any place other than a dedicated cemetery, no further disturbance or excavation of the site or nearby area reasonably suspected to contain human remains shall occur until the county coroner has examined the remains (Section 7050.5b). If the coroner determines or has reason to believe the remains are those of a Native American, the coroner must contact the NAHC within 24 hours (Section 7050.5c). The NAHC will notify the most likely descendant (MLD). With the permission of the landowner, the MLD may inspect the site of discovery. The inspection must be completed within 24 hours of notification of the MLD by the NAHC. The MLD may 10/24/2023 PH1 562 of 2254

Cultural Resources Survey Letter Report – Positive Findings 12 May 2023 Tideline Kensho Residential Project
recommend means of treating or disposing of, with appropriate dignity, the human remains and items associated with Native Americans.

City of Vista

General Plan
The Resources Conservation and Sustainability (RCS) Element of the Vista General Plan 2030 includes the following cultural resources goals:

RCS Goal 11: Continue to preserve and protect places, buildings, and objects that embody the City’s social, cultural, commercial, architectural, and agricultural history.

Policies of this goal include (1) using historical resources for school programs, community education, and events and coordinating programming with other historic sites; (2) continuing to preserve the City of Vista’s historic adobes and nationally registered and significant historic buildings and considering national and local historic designations for eligible city-owned properties; and (3) supporting preservation of historical resources, including providing for adaptive reuse and tax incentives, where appropriate.

RCS Goal 12: Acknowledge, preserve, and protect the City’s Native American Heritage.

Policies of this goal require (1) coordination with the NAHC and culturally affiliated tribes; (2) notification to culturally affiliated tribes of any proposed discretionary planning or grading applications affecting lands with potential archaeological resources; (3) project redesign, including the placement in open space, of resources identified during grading, appropriate mitigation if avoidance is not feasible, and repatriation of artifacts to the MLD; and (4) if human remains are identified, that they be avoided from further disturbance, preserved in place by an open space easement or similar protective measure, and that the MLD be provided with the opportunity to recommend other culturally appropriate treatment.

Downtown Vista Specific Plan
The DVSP was centered on the downtown core and extended outward along two major transportation corridors: Vista Village Drive and South Santa Fe Avenue. The DVSP covered a total area of approximately 352 gross acres. The primary goal of the DVSP was to stimulate reinvestment in older and underutilized properties to provide housing and commercial uses that would result in the re-creation of a dynamic downtown area. The DVSP established a vision for the downtown area as a place where residents and visitors could live, work, shop, and play. The DVSP served as a guide and directed new redevelopment, economic development, streetscape and traffic improvements, parking, pedestrian amenities, and mixed land uses in the Specific Plan Area over a 20-year planning period. A total of 1, 270 new dwelling units and 1,866,737 additional square feet of development were proposed for the Specific Plan Area.

The DVSP was adopted and the DVSP Program Environmental Impact Report (DVSP PEIR) was certified on April 13, 2010, by the Vista City Council (City of Vista 2010). A Mitigation Monitoring and Reporting Program, Findings of Fact, and Statement of Overriding Considerations regarding the DVSP PEIR were also adopted in 2010. The DVSP was adopted in 2010 prior to the Vista General Plan 2030 (adopted on February 28, 2012) and did not incorporate the goals and 10/24/2023 PH1 563 of 2254

Cultural Resources Survey Letter Report – Positive Findings 13 May 2023 Tideline Kensho Residential Project
policies of the Vista General Plan 2030. The first Addendum to the DVSP was approved in 2015 and modified the DVSP to incorporate the goals and policies of the Vista General Plan 2030 (City of Vista 2015). The amended DVSP provides a concise outline of regulations, policies, and guidelines were modified to shape the redevelopment of the downtown area of the city through design regulations and guidelines, land use policies, parks and open space goals, mobility improvements, development incentives, and public health assessments.

The Project is designed to adhere to the DVSP and tiers off the DVSP PEIR (City of Vista 2015).

The DVSP PEIR mitigation measures applicable to cultural resources potentially impacted by implementation of the Project are incorporated into Project mitigation as detailed in the Methods, Regulatory Setting, Analysis of Project Effects, and Recommendations section of this report.

Native American Traditional Cultural Properties

Native American Heritage Values
Federal and state laws mandate that consideration be given to the concerns of contemporary Native Americans with regard to potentially ancestral human remains, associated funerary objects, and items of cultural patrimony. Consequently, an important element in assessing the significance of the study site has been to evaluate the likelihood that these classes of items are present in areas that would be affected by the proposed Project.

Also potentially relevant to prehistoric archaeological sites is the category termed Traditional Cultural Properties in discussions of cultural resources management performed under federal auspices. According to Patricia L. Parker and Thomas F. King (1998), “Traditional” in this context refers to those beliefs, customs, and practices of a living community of people that have been passed down through the generations, usually orally or through practice. The traditional cultural significance of a historic property, then, is significance derived from the role the property plays in a community’s historically rooted beliefs, customs, and practices. Examples of properties possessing such significance include the following:

1. A location associated with the traditional beliefs of a Native American group about its origins, its cultural history, or the nature of the world;

2. A rural community whose organization, buildings and structures, or patterns of land use reflect the cultural traditions valued by its long-term residents;

3. An urban neighborhood that is the traditional home of a particular cultural group, and that reflects its beliefs and practices;

4. A location where Native American religious practitioners have historically gone, and are known or thought to go today, to perform ceremonial activities in accordance with traditional cultural rules of practice; and

5. A location where a community has traditionally carried out economic, artistic, or other cultural practices important in maintaining its historic identity.

A Traditional Cultural Property, then, can be defined generally as one that is eligible for inclusion in the NRHP because of its association with cultural practices or beliefs of a living community that (a) are rooted in that community’s history and (b) are important in maintaining the continuing cultural identity of the community.

10/24/2023 PH1 564 of 2254

Cultural Resources Survey Letter Report – Positive Findings 14 May 2023 Tideline Kensho Residential Project
Methodology
The goal of this survey was to provide a constraints-level survey to supplement the survey that was completed by HELIX Environmental Planning (Robbins-Wade and Davison 2017) and to identify the location of a known archaeological site (P-37-036435). Donna Beddow, Harris and Associates senior archaeologist, and Natane Mojado, Luiseño Native American monitor of Saving Sacred Sites, conducted the survey on July 19, 2021. An additional survey was conducted on February 3, 2022, for the parcels at 212 Guajome Street and 446 Lado De Loma Drive (APNs 179- 024-09 and 179-093-05, respectively) that were added to the Project. Jessica Alexander served as the Luiseño Native American monitor (Saving Sacred Sites) for the additional survey. The field survey was conducted using standard archaeological procedures and techniques. The survey area included the entirety of parcels 179-024-09 and 179-093-05, -09, -18, -23, -30, -32, and -34.

Continuous parallel transects (five-meter) were walked primarily in a west–east direction. Cleared areas including rodent burrows, dirt roads, and eroded areas were opportunistically surveyed for the presence of resources, and bedrock was inspected for evidence of use. The parcels surveyed were vegetated with non-native grasses, native trees (oaks), and non-native (peppers) trees. An eroded drainage runs east–west on the southern portion of the Project site. Two SFRs are present on the Project site. One is at the southwestern boundary of the Project site, and the second is at the northern boundary of the Project site. These structures were photographed, documented, and evaluated for significance. Visibility was limited in areas outside of the trails, eroded drainage, and cleared areas.

Historic aerial maps from 1938 through 2018 were reviewed. No evidence of the SFR at 446 Lado De Loma Drive was identified on the 1938 historical map; however, the SFR at 212 Guajome Street is present on the map. The next available map was for 1946, and the 446 Lade De Loma Drive SFR is present. The surrounding area during this time was primarily undeveloped or in agriculture.

Development of the area began in 1964 and continued throughout the 1980s. During this time, residential development occurred north and west of the Project site, and industrial/commercial development occurred east of the Project site (NETR Online 2022).

The survey area was photographed (Appendix A, Photographs) to document the environmental setting.

California Department of Parks and Recreation (DPR) site forms were completed for the identified isolate (I-TPH-1) and two SFRs (Confidential Appendix C, DPR Forms). The DPR forms and maps (Confidential Appendix D, Confidential Maps) were submitted to the South Coastal Information Center.

Results
The cultural survey was positive for the presence of resources. A historic isolate and two historic structures are present on the Project site.

446 Lado De Loma Drive (TPH-1)
An SFR, lean-to, and wood shed are at 446 Lado De Loma Drive (APN 179-093-05) at the southwestern boundary of the Project site. The one-story, 1,142-square-foot SFR was built in 1940 and constructed in a vernacular style. The frame structure was constructed using exterior wood siding. A 169-square-foot basement that has a dropped panel ceiling is present on the eastern side of the structure. It was likely used as a utility room. A crawl space is also present under the majority of the SFR. The water heater unit is in the crawl space. An asphaltic shingle gable roof is present, and the original windows have been replaced with vinyl; however, the original wood casements 10/24/2023 PH1 565 of 2254

Cultural Resources Survey Letter Report – Positive Findings 15 May 2023 Tideline Kensho Residential Project
surrounding the windows are still present. The original doors were replaced with solid wood doors on the northern and western elevations and with two doors primarily made of glass panes at the southern elevation. Cantilevered vents to the attic are present at the top of the SFR on the western and northern elevations. The structure contains two bedrooms and one bathroom (Redfin 2022a).

Two chimneys are present: one on the western elevation and another on the eastern elevation. The exterior of one fireplace is present at the front (western elevation) of the SFR, and an addition to the residence (eastern elevation) was constructed, which enclosed the exterior portion of the second fireplace. The addition was constructed on raised flagstone.

A lean-to type structure and a wood shed are east of the residential structure. The lean-to is open on two sides and is constructed of plywood. The shed is constructed of plywood, has a gable roof, and is accessible from the northern side through both a solid and a screen door. The shed was constructed on a cement slab.

The SFR is in poor condition and has not been maintained over time. Paint is peeling to the point that bare wood is exposed to the elements. The majority of fascia is damaged or missing. The exterior fireplace on the western elevation has been repaired numerous times and is in poor condition. The majority of wood siding is missing from the eastern elevation (see Appendix A).

The SFR is not listed in the DVSP Table 3-2, DVSP PEIR Table 4.5-6 (Significant and Potentially Significant Buildings), CRHR, or NRHP.

212 Guajome Street (TPH-2)
A one-story SFR and wood shed are at 212 Guajome Street (APN 179-024-09) at the northern boundary of the Project site. The 580-square-foot SFR was built in 1935 and constructed in a vernacular style. The frame structure was constructed using exterior wood siding. The siding is primarily placed horizontally on the structure except for the porch area (northern elevation) where it is placed vertically. The porch is constructed of wood in a deck style. Windows on the northern elevation are single-hung vinyl and not original. A room addition is on the western elevation and appears to have been an enclosure to a patio area. The addition was constructed of plywood with a flat roof. The windows on the western elevation of the addition are aluminum sliders. The windows on the southern elevation of the addition are fixed and placed on the outside of the structure and not within the window casings (see Appendix A, Photograph 21). A deck that wraps around the house beginning on the northern elevation around the eastern elevation and ending on the southern elevation is present. French doors lead out onto the deck on the northern elevation and likely are not original. A washer and dryer unit and a water heater are in the covered portion of the deck on the southern elevation. Portions of the house are set on top of concrete blocks (porch and deck areas). The eastern elevation contains an exterior door, air conditioning unit space (wall unit), and electrical box. A crawl space is present under the SFR. An asphaltic shingle gable roof is present. The structure contains one bedroom and one bathroom (Redfin 2022b).

A wood shed is south of the residential structure. The shed is constructed of plywood and has a flat roof, and aluminum slider windows are present on the northern and southern elevations. The shed is accessible from the eastern elevation through a recessed wood door. The shed is placed on cement blocks.

10/24/2023 PH1 566 of 2254

Cultural Resources Survey Letter Report – Positive Findings 16 May 2023 Tideline Kensho Residential Project
The SFR and shed are in poor condition and have not been maintained over time. Paint is peeling to the point that bare wood is exposed to the elements. The roof and fascia are damaged from lack of maintenance. The cement blocks that are balancing the deck are leaning and have not been maintained (see Appendix A).

The SFR is not listed in the DVSP Table 3-2, DVSP PEIR Table 4.5-6 (Significant and Potentially Significant Buildings), CRHR, or NRHP.

Isolate I-TPH-1
An isolate (I-TPH-1) was found by the Native American monitor, Natane Mojado, during the survey in the southern portion of the property. The isolate is a potential historic glass fragment.

The glass fragment was evaluated in the field, and no maker’s mark was evident. The fragment was thick glass and purple, and the only distinguishing feature is a ridge. However, this feature does not provide information as to function. It may have eroded downslope from Site P-37-036435.

The isolate was recorded, photographed, and left in place.

Site P-37-036435 was not relocated. No evidence of this site was identified in the eroded drainage feature or cleared areas in the surrounding area. Artifacts were collected as part of the prior testing program (Robbins-Wade and Davison 2017), which may be why the site was not relocated.

However, there is still the potential for resources to be present subsurface.

Resource Importance
The SFRs (TPH-1, TPH-2) retain integrity of location; however, they do not retain integrity of setting, design, materials, workmanship, feeling, or association). No significant event is known to have occurred that has made a significant contribution to the broad patterns of California’s history and cultural heritage, and the SFRs are not associated with people important in our past. The SFRs do not embody the distinctive characteristics of a type, period, region, or method of construction; represents the work of an important creative individual; or possesses high artistic value. The SFRs have not yielded and are not likely to yield information important in prehistory or history. As such, the SFRs are not historically significant.

Isolates (I-TPH-1) are, by definition, not significant resources.

Native American Outreach
The NAHC was contacted for a Sacred Lands File check to determine whether sacred lands are present on site. The NAHC response was positive for resources and recommended that the Pechanga Band of Luiseño Indians (Pechanga Band) be contacted for more information. The Pechanga Band and all Tribal bands on the list provided by the NAHC were contacted by email and regular mail for any information they may have regarding sacred sites that may be present on site. In addition, the Tribes were contacted subsequently with a follow-up email. Two Tribes (Rincon Band of Luiseño Indians [Rincon Band] and Pechanga Band) responded. The Pechanga Band requested additional information, which was provided to them, and the Rincon Band identified concerns that are described below.

The Rincon Band responded that they have “concerns that the Project may impact tangible Tribal Cultural Resources (TCRs), Traditional Cultural Landscapes (TCLs), and potential Traditional 10/24/2023 PH1 567 of 2254

Cultural Resources Survey Letter Report – Positive Findings 17 May 2023 Tideline Kensho Residential Project
Cultural Properties (TCPs).” Rincon further identified that the Project site is within the Rincon Band’s area of historic interest and that “embedded in these resources are Rincon’s history, culture, and continuing traditional identity.” The Rincon Band requested that an archaeological/cultural resources survey be conducted and that a “professional Tribal monitor from the Rincon Band accompany the archaeologist.” They further requested to “consult directly with the lead agency regarding Project impacts to cultural resources.”

The Native American monitors, Natane Mojado and Jessica Alexander, identified the area as sensitive and requested that the Project be conditioned with an archaeological and Tribal monitoring program (Confidential Appendix E, Sacred Lands File Check).

Recommendations
It is recommended that both an archaeological monitor and a Luiseño Native American monitor be engaged to provide monitoring for earth-disturbing activities during Project construction.

Archaeological and Tribal monitoring is identified as Mitigation Measure CUL-2 in the DVSP PEIR and is provided below:

DVSP Mitigation Measure CUL-2: Prior to the issuance of any grading permit for any future development Project in the SPA that has been identified as having the potential to contain subsurface cultural resources, the Project applicant shall provide written evidence to the City Planner that the applicant has retained a city- approved professional archaeologist and Native American monitor, if appropriate, to observe SPA grading and excavation activities for the presence of cultural materials. If any cultural materials are found, work in the area shall be halted so that the significance of the find can be evaluated. A significant discovery may require additional evaluation and mitigation; however, any such additional requirements would be site specific and would be determined at the time of discovery by the professional archaeologist and Native American monitor. A post- construction monitoring report shall be prepared and submitted to the City Planner at the completion of grading.

Project Implementation of DVSP Mitigation Measure CUL-2: The proposed Project would implement Mitigation Measure CUL-2 from the DVSP PEIR as follows:

x For discoveries of Native American human remains, the procedures required under California Public Resources Code, Section 5097.98, and California Health and Safety Code, Section 7050.5, shall be followed. If human remains are encountered, all ground-disturbing activities shall halt within 100 feet (buffer area) of the discovery, and orange construction fencing shall be installed to denote the buffer area. Work on the remainder of the Project site could continue, but all work within the buffer area shall cease until the and procedures required under the aforementioned code sections are completed and the Tribal representatives have authorized the removal of the fencing around the buffer area.

10/24/2023 PH1 568 of 2254

Cultural Resources Survey Letter Report – Positive Findings 18 May 2023 Tideline Kensho Residential Project
x If, during ground-disturbing activities on the Project site, Tribal Cultural Resources, as defined in California Public Resources Code, Section 21074, or unique cultural resources, as defined in California Public Resources Code, Section 21083.2, are discovered that were not assessed by the site-specific archaeological reports, all ground-disturbing activities shall halt within 50 feet (find area) of the discovery until the Tribal representatives and Project archaeologist can assess the discovery and recommend recovery, treatment, and reburial procedures. Work on the remainder of the Project site may continue, but all work within the find area shall cease until the Tribal representatives and Project archaeologist have completed their assessments and the Tribal representatives have made a reburial recommendation.

x At least 30 days prior to issuance of the first grading permit for the Project, the developer/permit applicant shall enter into agreements with the consulting Tribes for Native American monitors. In conjunction with the archaeological monitors, the Tribal representatives/Native American monitors shall attend the pre-grading meeting with the contractors to provide cultural sensitivity training for all construction personnel. In addition, Tribal representatives/Native American monitors shall be on site during all initial ground-disturbing activities, including clearing, grubbing, tree removal, grading, and trenching, and excavation of each portion of the Project site. In conjunction with the archaeological monitors, the Tribal representatives/Native American monitors have the authority to temporarily divert, redirect, and/or halt ground-disturbing activities to allow appropriate identification, evaluation, and potential recovery of cultural resources. The developer/permit applicant shall submit a fully executed copy of the agreements to the City of Vista. Upon verification, the Project archaeologist shall clear this condition as being satisfied.

x At least 30 days prior to issuance of the first grading permit for the Project, the Project applicant shall retain a Project archaeologist who meets the minimum qualifications of the U.S. Secretary of the Interior’s Standards and Guidelines (NPS 1983). The Project archaeologist shall be present for all ground-disturbing and grading activities on the Project site and shall be responsible for notifying and coordinating monitoring by the consulting Tribes.

x The Project archaeologist and Tribal representatives shall attend the pre- grading meeting with the Project’s construction manager and any contractors and shall conduct a cultural sensitivity training to provide an overview of the cultural sensitivity of the Project site and surrounding areas, the requirements for the Project archaeologist and Tribal representatives, the protocols that apply in the event of inadvertent finds, and any other appropriate disclosures and discussions.

x Upon completion of all ground-disturbing and grading activities on the Project site, the Tribal representatives shall rebury any resources recovered from the Project site in an open space area that shall remain free from any active 10/24/2023 PH1 569 of 2254

Cultural Resources Survey Letter Report – Positive Findings 19 May 2023 Tideline Kensho Residential Project
recreational uses or any further excavation or ground disturbance. Any reburial site shall be culturally appropriate and explicitly approved in writing by the consulting Tribes. The reburial location shall be covered first by a layer of geomat and then backfilled with clean fill dirt. Once reburial activities are completed, the site shall be protected via a restrictive covenant or similar deed restriction that prohibits future excavation or disturbance of the reburial location.
x Prior to Grading Permit Final Inspection, a Phase IV Cultural Resources Monitoring Report shall be submitted that complies with the City of Vista Community Development Department’s requirements for such reports for all ground-disturbing activities associated with this grading permit. The report shall follow the City of Vista’s cultural resources standard procedures. The report shall include results of any feature relocation or residue analysis required and evidence of the required cultural sensitivity training for construction staff held during the required pre-grade meeting and evidence that any cultural and heritage material/artifacts have been treated in accordance to procedures stipulated in the Phase IV Cultural Resources Monitoring Report. The Phase IV Cultural Resources Monitoring Report shall be filed with the City of Vista under a confidential cover and shall not be subject to public records requests.

If you have any questions, please contact me at (619) 236-1778.

Sincerely,

DONNA BEDDOW, RPA
Senior Archaeologist
Attachments
USGS Topographical Map – San Marcos
Appendix A – Photographs
Confidential Appendices – Under Separate Cover
Appendix B – CHRIS Background Data
Appendix C – DPR Forms
Appendix D – Confidential Maps
Appendix E – Sacred Lands File Check
10/24/2023 PH1 570 of 2254

Cultural Resources Survey Letter Report – Positive Findings 20 May 2023 Tideline Kensho Residential Project
References

Campbell, Leon G. 1977. “The Spanish Presidio in Alta California during the Mission Period 1769–1784.” Journal of the West 16(4):63–77.

Carrico, Richard L. 1977. Archaeological/Historical Survey of the Oaks North Villa PRD/Bernardo Trails No. 5 Projects. Unpublished manuscript on file at the South Coastal Information Center.

Carrico, Richard L. 1986. “Before the Strangers: American Indians in San Diego at the Dawn of Contact.” In The Impact of European Exploration and Settlement on Local Native Americans. San Diego: Cabrillo Historical Association. 5–12.

Chartkoff, Joseph L., and Kerry Kona Chartkoff. 1984. The Archaeology of California. Stanford:

Stanford University Press.

Christenson, Lynne E. 1992. “The Late Prehistoric Yuman Settlement and Subsistence System:

Coastal Adaptation.” In Essays on the Prehistory of Maritime California. Terry L. Jones, ed. Davis: University of California, Davis, Center for Archaeological Research. 217–230.

City of Vista. 2010. Downtown Vista Specific Plan Update Program Environmental Impact Report (State Clearinghouse No. 2009061018). March 11.

City of Vista. 2015. Addendum No. 1 to the Downtown Specific Plan Update Program Environmental Impact Report. State Clearinghouse No. 2009061018.

Cline, Lora L. 1979. The Kwaaymii: Reflections on a Lost Culture. El Centro: Imperial Valley Museum.

Cline, Lora L. 1984. Just Before Sunset. Jacumba: J and L Enterprises.

Costo, Jeanette Henry. 1987. “The Sword and the Cross: The Missions of California.” In The Missions of California: A Legacy of Genocide. Rupert Costo and Jeanette Henry Costo, eds. San Francisco: Indian Historian Press. 49–66.

Erlandson, Jon M., and Roger H. Colton. 1991. “An Archaeological Context for Early Holocene Studies on the California Coast.” In Hunter-Gatherers of the Early Holocene Coastal California. Jon M. Erlandson and Roger H. Colton, eds. Los Angeles: University of California, Los Angeles, Institute of Archaeology. 1–10.

Gallegos, Dennis. 1995. Cultural Resource Phase I Boundary Test for the Jamul Shopping Center Project. Unpublished manuscript on file at the County of San Diego, Planning and Development Services.

Hale, Micah, Brad Comeau, Adrienne Dorrler, and Adam Giacinto. 2018. Cultural Resources Report for the Newland Sierra Project, San Diego County, California. Unpublished manuscript on file at the County of San Diego, Planning and Development Services. 10/24/2023 PH1 571 of 2254

Cultural Resources Survey Letter Report – Positive Findings 21 May 2023 Tideline Kensho Residential Project

Jackson, Robert H., and Edward Castillo. 1995. Indians, Franciscans, and Spanish Colonization:

The Impact of the Mission System on California Indians. Albuquerque: University of New Mexico Press.

Kaldenberg, Russell L. 1976. “Paleo-Technological Change at Rancho Park North, San Diego County, California.” Master’s thesis, San Diego State University.

Masters, Patricia M., and Dennis R. Gallegos. 1997. “Environmental Change and Coastal Adaptations in San Diego County during the Middle Holocene.” In Archaeology of the California Coast during the Middle Holocene. Jon Erlandson and Michael Glassow, eds. Los Angeles:

University of California, Los Angeles, Institute of Archaeology. 11–22.

Moratto, Michael. 1984. California Archaeology. San Francisco: Academic Press.

Moriarty, James R. 1967. “Transitional Pre-Desert Phase in San Diego County, California.” Science 155:553–556.

NETR Online. 2022. Historic Aerials. Accessed May 2023. http://www.historicaerials.com .

Parker, Patricia L., and Thomas F. King. 1998. Guidelines for Evaluating and Documenting Traditional Cultural Properties. U.S. Department of the Interior, National Park Service, National Register, History and Education, National Register of Historic Places. 1990, revised 1992.

Phillips, George H. 1981. The Enduring Struggle: Indians in California History. San Francisco:

Boyd and Fraser Publishing Company.

Redfin. 2022a. “446 Lado De Loma Dr, Vista, CA 92083.” Accessed May 2023. https://www.redfin.com/CA/Vista/446-Lado-De-Loma-Dr-92083/home/3503121 .

Redfin. 2022b. “212 Guajome St, Vista, CA 92083.” Accessed May 2023. https://www.redfin.com/CA/Vista/212-Guajome-St-92083/home/3501914 .

Robbins-Wade, Mary, and Kristina Davison. 2017. Pheasant Hill – Cultural Resources Survey.

Unpublished manuscript on file at the South Coastal Information Center, San Diego State University.

Rogers, Malcolm. 1939. San Diego Museum Papers No. 3. San Diego: San Diego Museum of Man.

Rogers, Malcolm. 1966. Ancient Hunters of the Far West. San Diego: Copley Press.

Shipek, F.C. 1993. “Kumeyaay Plant Husbandry: Fire Water, and Erosion Management Systems.” In Before the Wilderness: Native American Environmental Management. Thomas C.

Blackburn and Kat Anderson, eds. Menlo Park: Ballena Press. 78–388.

10/24/2023 PH1 572 of 2254

Cultural Resources Survey Letter Report – Positive Findings 22 May 2023 Tideline Kensho Residential Project
Taylor, R.E., and Clement Meighan. 1978. Chronologies in New World Archaeology. New York:

Academic Press.

True, Delbert. L. 1958. “An Early Complex in San Diego County, California.” American Antiquity 23(3):255–263.

True, Delbert. L. 1966. “Archaeological Differentiation of Shoshonean and Yuman Speaking Groups in Southern California.” PhD. diss. University of California, Los Angeles.

True, Delbert. L. 1970. Investigation of a Late Prehistoric Complex in the Cuyamaca Rancho State Park, San Diego County, California. Los Angeles: University of California, Los Angeles, Department of Anthropology, Archaeological Survey Monograph.

Wahoff, Tanya, and Christy Dolan. 2000. Environmental Assessment for the Rincon San Luiseño Band of Mission Indians, Rincon Casino. Unpublished manuscript on file at the County of San Diego, Planning and Development Services.

Wallace, William J. 1955. “A Suggested Chronology for Southern California Coastal Archaeology.” Southwestern Journal of Anthropology 11:214–230.

Wallace, William J. 1978. “Post-Pleistocene Archaeology, 9000–2000 B.C.” In Handbook of North American Indians. Vol. 8. Robert F. Heizer, ed. Washington, DC: Smithsonian Institution. 25–36.

Warren, Claude N., and D.L. True. 1961. UCLA Archaeological Annual Survey Reports, 1960– 1961. Los Angeles: University of California, Los Angeles.

Warren, Claude N., D.L. True, and A. Eudy. 1961. “Early Gathering Complexes if Western San Diego County.” In University of California, Los Angeles, Archaeological Annual Survey Reports, 1960–1961. Los Angeles: University of California, Los Angeles.

10/24/2023 PH1 573 of 2254

Da
t
e
:

8 /
2 7
/
2 0
2 1

-

L
a
s
t

s
a
v
e
d

b
y
:

N
o
a
h
.

S
t
o
o
p

-

P
a
t
h
:

C
:
\
G
I
S
\
P
r
o
j
e
c
t
s
\
C
i
t
y

o
f

V
i
s
t
a
\
T
i
d
e
l
i
n
e

P
h
e
a
s
a
n
t

H
i
l
l
\
M
a
p

D
o
c
s
\
B
i
o
\
B
i
o

L
et
t
e
r
\
F
i
g
u
r
e
1 _
R
e
g
i
o
n
a
l
L
o
c
a
t
i
o
n
.
m
x
d
Imperial
Beach
Chula
Vista
National
City Bonita
Lemon
Grove
Poway
Encinitas
Carlsbad Escondido
Vista Valley
Center
Hidden
MeadowsOceanside
Bonsall
Fallbrook
Rainbow
JamulSpring
Valley
AlpineHarbison
Canyon
Lakeside
Pine
Valley
El Cajon
Santee
Ramona San Diego
Country
Estates
Julian
Temecula
Wildomar
Cam
San Diego
ge
C
o
u
n
t
y
San Diego County
Riverside County

MEXICOMEXICO
Pacific Ocean
ÄÆ52
ÄÆ54 ÄÆ94
ÄÆ94ÄÆ163
ÄÆ282
ÄÆ188ÄÆ905
ÄÆ54
ÄÆ274
ÄÆ125
ÄÆ74
ÄÆ209
ÄÆ79
ÄÆ56
ÄÆ75
ÄÆ74
ÄÆ79ÄÆ67
ÄÆ76
ÄÆ79
ÄÆ78
§¨¦5
§¨¦215
§¨¦5
§¨¦8
§¨¦15
§¨¦8
§¨¦5
§¨¦8
§¨¦805
§¨¦5
§¨¦15
Tideline Pheasant Hill Residential Project
Incorporated Areas
Draft North County MSCP
Pre-Approved Mitigation Area for
Draft North County MSCP
Subarea Plan
MSCP South County Subarea
Regional Location
Source: ESRI 2021.

Figure 1±0105
Miles
Project Site
!(^
10/24/2023 PH1 574 of 2254

O
C
E
A
N
VI
E
W

C
T
LYON

CR

TER R A C E
D RGU
A
J
O
M
E

S
T
RANC
HO

V
I
S
T
A
R
D
EUCA
L
Y
P
T
U
S

A
V
E
L

M
I
R
A
S
O
PARK
A
V
AS
T
R
O

C
T
UNN
A
M
E
D 55
T H RD
HA
C
I
E
N
D
A

D
R

BANDINI PL
OCE
A
N

V
I
E
W

D
R
U
N
I
T
Y

W
Y
S
S
A
N
T
A

F
E

A
V
P
I
N
A

L
N

HILDALE CR

RANCHO VIS
T
A

P
L
M
E
R
C
A
N
T
I
L
E

S
T

PE TERS

D
R

LADO DE LOMA DR
ED
D
I
E

D
R
R
H
O
D
A

L
N
Project Site
Off-Site Improvements
Da
t
e
:

3 /
3 0
/
2 0
2 2

-

L
a
s
t

s
a
v
e
d

b
y
:

R
a
n
d
y
.

D
e
o
d
a
t

-

P
a
t
h
:

C
:
\
G
I
S
\
P
r
o
j
e
c
t
s
\
C
i
t
y

o
f

V
i
s
t
a
\
T
i
d
e
l
i
n
e

P
h
e
a
s
a
n
t

H
i
l
l
\
M
a
p

D
o
c
s
\
B
i
o
\
B
i
o
L
e
t
t
e
r
\
F
i
g
u
r
e
2 _
P
r
o
j
e
c
t
S
i
t
e
.
m
x
d
Source: Maxar Imagery 2021.
±0300150
Feet Project Site
Source: Maxar Imagery 2021.

Figure 2
Tideline Pheasant Hill Residential Project
Poway
Encinitas
Carlsbad
Escondi do
Vista Vall ey
Cente r
Hidden
MeadowsOceanside
Bonsall
Fallbrook
Rainbow
AlpineHarbison
C
Lakeside
Sante e
Ramo na
San Diego
Country
Estates
na
int
Capistrano Te me cu la
San Diego
San Dieg
o
County
San Diego County
Riverside Cou

n
t
y
Project Site
!(^
10/24/2023 PH1 575 of 2254

Appendix A. Photographs

10/24/2023 PH1 576 of 2254

This page intentionally left blank.
10/24/2023 PH1 577 of 2254

Cultural Resources Survey Letter Report – Positive Findings A-1 0D\ 2023 Tideline Kensho Residential Project
Photograph 1: On-site road looking toward northern property line.

Photograph 2: Encampment of people experiencing homelessness in northern portion of project site. 10/24/2023 PH1 578 of 2254

Cultural Resources Survey Letter Report – Positive Findings A-2 0D\ 2023 Tideline Kensho Residential Project
Photograph 3: Southern portion of project site.

Photograph 4: On-site road looking toward southern property line. 10/24/2023 PH1 579 of 2254

Cultural Resources Survey Letter Report – Positive Findings A-3 0D\ 2023 Tideline Kensho Residential Project
Photograph 5: On-site drainage.

Photograph 6: Southwestern portion of project site.
10/24/2023 PH1 580 of 2254

Cultural Resources Survey Letter Report – Positive Findings A-4 0D\ 2023 Tideline Kensho Residential Project
Photograph 7: Central portion of project site.

Photograph 8: Dumping/encampment of people experiencing homelessness – southern portion of project site. 10/24/2023 PH1 581 of 2254

Cultural Resources Survey Letter Report – Positive Findings A-5 0D\ 2023 Tideline Kensho Residential Project
Photograph 9: 446 Lado De Loma Drive – western elevation (TPH-1).

Photograph 10: 446 Lado De Loma Drive, exterior fireplace – western elevation (TPH-1). 10/24/2023 PH1 582 of 2254

Cultural Resources Survey Letter Report – Positive Findings A-6 0D\ 2023 Tideline Kensho Residential Project
Photograph 11: 446 Lado De Loma Drive – southern elevation (TPH-1).

Photograph 12: 446 Lado De Loma Drive, lean-to – eastern elevation (TPH-1). 10/24/2023 PH1 583 of 2254

Cultural Resources Survey Letter Report – Positive Findings A-7 0D\ 2023 Tideline Kensho Residential Project
Photograph 13: 446 Lado De Loma Drive, shed – eastern elevation (TPH-1).

Photograph 14: 446 Lado De Loma Drive – eastern elevation (TPH-1). 10/24/2023 PH1 584 of 2254

Cultural Resources Survey Letter Report – Positive Findings A-8 0D\ 2023 Tideline Kensho Residential Project
Photograph 15: 446 Lado De Loma Drive – northern elevation (TPH-1).

Photograph 16: 446 Lado De Loma Drive, basement – eastern elevation (TPH-1). 10/24/2023 PH1 585 of 2254

Cultural Resources Survey Letter Report – Positive Findings A-9 0D\ 2023 Tideline Kensho Residential Project
Photograph 17: 446 Lado De Loma Drive, crawl space – eastern elevation (TPH-1).

Photograph 18: 212 Guajome Street – northern elevation (TPH-2). 10/24/2023 PH1 586 of 2254

Cultural Resources Survey Letter Report – Positive Findings A-10 0D\ 2023 Tideline Kensho Residential Project
Photograph 19: 212 Guajome Street – northern elevation, porch (TPH-2).

Photograph 20: 212 Guajome Street – western elevation, addition (TPH-2). 10/24/2023 PH1 587 of 2254

Cultural Resources Survey Letter Report – Positive Findings A-11 0D\2023 Tideline Kensho Residential Project
Photograph 21:212 Guajome Street – southern elevation, addition (TPH-2).

Photograph 22: 212 Guajome Street – eastern elevation (TPH-2). 10/24/2023 PH1 588 of 2254

Cultural Resources Survey Letter Report – Positive Findings A-12 0D\ 2023 Tideline Kensho Residential Project
Photograph 23: 212 Guajome Street – southern elevation, shed (TPH-2). 10/24/2023 PH1 589 of 2254

City of Vista Attachment F –Second Update Report of Geotechnical Investigation Tideline Kensho Residential Project – IS/MND P-22-0282 August 2023

Attachment F –Second Update Report of Geotechnical Investigation

10/24/2023 PH1 590 of 2254

City of Vista Attachment F –Second Update Report of Geotechnical Investigation Tideline Kensho Residential Project – IS/MND P-22-0282 August 2023

This page left intentionally blank.
10/24/2023 PH1 591 of 2254

4373 Viewridge Avenue
Suite B
San Diego, California 92123
858.292.7575
944 Calle Amanecer
Suite F
San Clemente, CA 92673
949.388.7710
www.usa-nova.com
s77Report
Second Update Geotechnical Investigation
Submitted to:

Tideline Partners
2148 Jimmy Durante Boulevard, Suite B
Del Mar, CA 92014
NOVA Project No. 2021172
April 25, 2022
Proposed Kensho Housing Residential Apartments
Lado De Loma Drive, Vista, California
10/24/2023 PH1 592 of 2254

GEOTECHNICAL

MATERIALS
SPECIAL INSPECTION DVBE ŒŒSBE ŒŒSDVOSB ŒŒSLBE
4373 Viewridge Avenue, Suite B
San Diego, CA 92123
P: 858.292.7575
www.usa-nova.com 944 Calle Amanecer, Suite F
San Clemente, CA 92673
P: 949.388.7710
Tideline Partners April 25, 2022
Mr. Lev Gershman NOVA Project 2021172
2148 Jimmy Durante Boulevard, Suite B
Del Mar, CA 92014
Subject: Report
Second Update Geotechnical Investigation
Proposed Kensho Housing Residential Apartments
Lado De Loma Drive, Vista, California
Dear Mr. Gershman:

The work reported herein was completed by NOVA Services, Inc. (NOVA) for Tideline Partners in accordance with the work described by NOVA proposals dated August 2, 2021, January 7, 2022, and March 24, 2022.

Revised site development concepts were provided to NOVA in March 2022. This report provides the findings of additional site characterization and reporting to address development concepts that are current as of this date.

NOVA appreciates the opportunity to be of continued service to Tideline Partners. Should you have any questions regarding this report or other matters, please do not hesitate to call us at 858.292.7575 x 209.

Sincerely,
NOVA Services, Inc.
__________________________ _______________________
John F. O’Brien, PE, GE Melissa Stayner, PG, CEG
Principal Geotechnical Engineer Senior Engineering Geologist _________________________________________________
Wail Mokhtar Hillary Price
Senior Project Manager Project Geologist
10/24/2023 PH1 593 of 2254

Second Update Report of Geotechnical Investigation
Kensho Housing Residential Apartments, Vista, CA
NOVA Project No. 2021172
April 25, 2022
Page i of vii
Report
Second Update Geotechnical Investigation
Kensho Housing Residential Apartments
Lado De Loma Drive, Vista, California
____________________________________________________________ Table of Contents

1. INTRODUCTION................................................................................1

1.1 Terms of Reference.............................................................................................1

1.2 Previous Geotechnical Reporting......................................................................1

1.2.1 Work by Others .........................................................................................................................1

1.2.2 Previous NOVA Reporting ........................................................................................................2

1.3 Objectives, Scope, and Limitations of This Work.............................................2

1.3.1 Objectives..................................................................................................................................2

1.3.2 Scope ........................................................................................................................................2

1.3.3 Limitations.................................................................................................................................4

1.3.4 Understood Use ........................................................................................................................4

1.4 Organization of this Report................................................................................4

2. PROJECT INFORMATION ................................................................5

2.1 Site Location........................................................................................................5

2.2 Current and Historic Site Use.............................................................................6

2.2.1 Current ......................................................................................................................................6

2.2.2 Historic ......................................................................................................................................6

2.3 Planned Development.........................................................................................7

2.3.1 Design Basis .............................................................................................................................7

2.3.2 Proposed Apartments ...............................................................................................................7

2.3.3 Structural...................................................................................................................................8

2.3.4 Planned Site Grading................................................................................................................8

3. SUBSURFACE EXPLORATION AND LABORATORY TESTING...10

3.1 Overview ............................................................................................................10

3.2 Test Pits .............................................................................................................11 10/24/2023 PH1 594 of 2254

Second Update Report of Geotechnical Investigation
Kensho Housing Residential Apartments, Vista, CA
NOVA Project No. 2021172
April 25, 2022
Page ii of vii

3.2.1 Test Pits by NOVA ..................................................................................................................11

3.2.2 Test Pits by Others..................................................................................................................12

3.3 Percolation Testing...........................................................................................13

3.3.1 General....................................................................................................................................13

3.3.2 Drilling .....................................................................................................................................13

3.3.3 Conversion to Percolation Wells .............................................................................................13

3.3.4 Percolation Testing..................................................................................................................14

3.3.5 Closure....................................................................................................................................15

3.4 Seismic Refraction Survey...............................................................................15

3.4.1 General....................................................................................................................................15

3.4.2 Indications of the Seismic Lines..............................................................................................17

3.5 Laboratory Testing............................................................................................19

3.5.1 General....................................................................................................................................19

3.5.2 Gradation.................................................................................................................................19

3.5.3 Maximum Density and Optimum Moisture..............................................................................19

3.5.4 Plasticity and Expansion Potential..........................................................................................20

3.5.5 Direct Shear ............................................................................................................................20

3.5.6 R-Value Testing.......................................................................................................................20

3.5.7 Chemical Testing.....................................................................................................................21

4. SITE CONDITIONS..........................................................................22

4.1 Geologic Setting................................................................................................22

4.1.1 Regional ..................................................................................................................................22

4.1.2 Site Specific.............................................................................................................................22

4.2 Surface, Subsurface, and Groundwater..........................................................23

4.2.1 Surface....................................................................................................................................23

4.2.2 Subsurface..............................................................................................................................25

4.2.3 Groundwater............................................................................................................................27

4.2.4 Surface Water .........................................................................................................................27

5. REVIEW OF GEOLOGIC, SOIL, AND SITING HAZARDS..............28

5.1 Overview ............................................................................................................28

5.2 Geologic Hazards..............................................................................................28

5.2.1 Strong Ground Motion.............................................................................................................28

5.2.2 Fault Rupture...........................................................................................................................29

5.2.1 Landslide.................................................................................................................................30

5.2.2 Ground Lurching......................................................................................................................31

5.3 Soil Hazards.......................................................................................................31

5.3.1 Embankment Stability .............................................................................................................31

5.3.2 Seismic....................................................................................................................................31

5.3.3 Expansive Soil.........................................................................................................................32 10/24/2023 PH1 595 of 2254

Second Update Report of Geotechnical Investigation
Kensho Housing Residential Apartments, Vista, CA
NOVA Project No. 2021172
April 25, 2022
Page iii of vii

5.3.4 Hydro-Collapsible Soils...........................................................................................................32

5.3.5 Near Surface Rock..................................................................................................................33

5.4 Siting Hazards ...................................................................................................33

5.4.1 Effect on Adjacent Properties..................................................................................................33

5.4.2 Flood .......................................................................................................................................33

5.4.3 Tsunami...................................................................................................................................33

5.4.4 Seiche .....................................................................................................................................33

6. EARTHWORK AND FOUNDATIONS..............................................35

6.1 Overview ............................................................................................................35

6.1.1 Review of Site Hazards...........................................................................................................35

6.1.2 Site Suitability..........................................................................................................................35

6.1.3 Review and Surveillance.........................................................................................................36

6.2 Seismic Design Parameters .............................................................................36

6.2.1 Site Class ................................................................................................................................36

6.2.2 Seismic Design Parameters....................................................................................................36

6.3 Corrosivity and Sulfates...................................................................................37

6.3.1 General....................................................................................................................................37

6.3.2 Metals......................................................................................................................................37

6.3.3 Sulfate Attack..........................................................................................................................38

6.3.4 Limitations...............................................................................................................................39

6.3.5 Review and Surveillance.........................................................................................................39

6.4 Earthwork...........................................................................................................39

6.4.1 General....................................................................................................................................39

6.4.2 Site Preparation.......................................................................................................................39

6.4.3 Excavation Characteristics, Planning and Contracting...........................................................39

6.4.4 Select Fill.................................................................................................................................41

6.4.5 Remedial Grading ...................................................................................................................42

6.4.6 Subgrade Stabilization ............................................................................................................44

6.4.7 Temporary Excavations ..........................................................................................................44

6.4.8 Groundwater Seepage............................................................................................................45

6.4.9 Trenching and Backfilling for Utilities......................................................................................45

6.5 Shallow Foundations ........................................................................................46

6.5.1 General....................................................................................................................................46

6.5.2 Spread Footings......................................................................................................................46

6.5.3 Lateral Resistance...................................................................................................................46

6.5.4 Settlement ...............................................................................................................................47

6.5.5 Ground Supported Slabs.........................................................................................................47

6.6 Moisture Barrier Beneath Slabs.......................................................................48

6.6.1 Capillary Break........................................................................................................................48

6.6.2 Vapor Barrier...........................................................................................................................48

6.6.3 Limitations of This Recommendation......................................................................................48 10/24/2023 PH1 596 of 2254

Second Update Report of Geotechnical Investigation
Kensho Housing Residential Apartments, Vista, CA
NOVA Project No. 2021172
April 25, 2022
Page iv of vii

6.7 Conventional Retaining Walls..........................................................................49

6.7.1 Shallow Foundations...............................................................................................................49

6.7.2 Lateral Earth Pressures ..........................................................................................................49

6.8 MSE Walls..........................................................................................................51

6.8.1 General....................................................................................................................................51

6.8.2 Backfill.....................................................................................................................................51

6.8.3 Limits of Backfill.......................................................................................................................51

6.8.4 Design Review ........................................................................................................................52

6.9 Permanent Soil Nail Wall ..................................................................................52

6.9.1 General....................................................................................................................................52

6.9.2 Responsibility ..........................................................................................................................53

6.9.3 Geotechnical Design Parameters ...........................................................................................53

7. PAVEMENTS...................................................................................54

7.1 General...............................................................................................................54

7.2 Drainage.............................................................................................................54

7.3 Preventive Maintenance....................................................................................54

7.4 Subgrade Preparation.......................................................................................55

7.4.1 General....................................................................................................................................55

7.4.2 Timely Pavement Construction ...............................................................................................55

7.4.3 Surveillance.............................................................................................................................55

7.5 Flexible Pavements...........................................................................................55

7.6 Rigid Pavements ...............................................................................................56

8. STORMWATER INFILTRATION FEASIBILITY...............................58

8.1 Overview ............................................................................................................58

8.2 Infiltration Rate..................................................................................................58

8.3 Review of Geotechnical Feasibility Criteria....................................................59

8.3.1 Overview .................................................................................................................................59

8.3.2 Soil and Geologic Conditions..................................................................................................59

8.3.3 Settlement and Volume Change.............................................................................................60

8.3.4 Slope Stability..........................................................................................................................60

8.3.5 Utilities.....................................................................................................................................60

8.3.6 Groundwater Mounding...........................................................................................................60

8.3.7 Retaining Walls and Foundations ...........................................................................................60

8.3.8 Other .......................................................................................................................................60 10/24/2023 PH1 597 of 2254

Second Update Report of Geotechnical Investigation
Kensho Housing Residential Apartments, Vista, CA
NOVA Project No. 2021172
April 25, 2022
Page v of vii

8.4 Preliminary Recommendation for Infiltration..................................................60

9. CONSTRUCTION REVIEW, OBSERVATION, AND TESTING........61

9.1 Overview ............................................................................................................61

9.2 Design Phase Review........................................................................................61

9.3 Construction Observation and Testing...........................................................61

9.3.1 Preconstruction Conference....................................................................................................61

9.3.2 Special Inspections .................................................................................................................61

9.3.3 Continuous Soils Special Inspection.......................................................................................61

9.3.4 Periodic Soils Special Inspection............................................................................................62

9.3.5 Testing During Inspections......................................................................................................62

10. REFERENCES.................................................................................63

10.1 Site Specific.......................................................................................................63

10.2 Design ................................................................................................................63

10.3 Site Setting.........................................................................................................64 Plates
Plate 1 Subsurface Investigation Map
Plate 2 Cross-Sections A-A’, B-B’, C-C’ and D-D’
List of Appendices
Appendix A Use of the Geotechnical Report
Appendix B Logs of Test Pits and Percolation Borings
Appendix C Records of the Laboratory Testing
Appendix D Records of Geophysical Testing
Appendix E Worksheet C.4-1: Categorization of Infiltration Feasibility 10/24/2023 PH1 598 of 2254

Second Update Report of Geotechnical Investigation
Kensho Housing Residential Apartments, Vista, CA
NOVA Project No. 2021172
April 25, 2022
Page vi of vii
List of Tables
Table 3-1. Summary of the Test Pits by NOVA
Table 3-2. Summary of the Test Pits Reported by GSI 2016 Table 3-3. Summary of the Trenches Reported by VME 2003 Table 3-4. Summary of the Percolation Testing by NOVA Table 3-5. Soil Gradation Testing
Table 3-6. Maximum Density and Optimum Moisture Testing Table 3-7. Atterberg Limits
Table 3-8. Direct Shear Testing, GSI 2016
Table 3-9. R-Value
Table 3-10. Chemical Testing
Table 5-1. Descriptors of Expansive Soil after ASTM D4829 Table 6-1. Site-Specific Seismic Design Parameters, ASCE 7-16 Table 6-2. Abstract of Chemical Testing
Table 6-3. Soil Resistivity and Corrosion Potential
Table 6-4. Exposure Categories and Requirements for Water-Soluble Sulfates Table 6-5. Wall Lateral Loads from Soil
Table 6-6. Soil Strength Parameters for MSE Retaining Walls Table 6-7. Soil Nail Wall Geotechnical Design Parameters Table 7-1. Preliminary Recommendations for Flexible Pavements Table 7-2. Recommendations for Concrete Pavements
Table 8-1. Infiltration Rate Determined by Percolation Testing List of Figures
Figure 1-1. Vicinity Map
Figure 2-1. Site Location and Limits
Figure 2-2. Aerial View, 1938
Figure 2-3. Site Section of Planned Development
Figure 2-4. Planned Development
Figure 3-1. Locations of Subsurface Exploration
Figure 3-2. Test Pit Excavation (TP-5, August 2021)
Figure 3-3. Percolation Testing, August 2021
10/24/2023 PH1 599 of 2254

Second Update Report of Geotechnical Investigation
Kensho Housing Residential Apartments, Vista, CA
NOVA Project No. 2021172
April 25, 2022
Page vii of vii
List of Figures (continued)
Figure 3-4. Seismic Refraction Geometry
Figure 3-5. Subsurface Profile along Seismic Line S-2
Figure 3-6. D10 Seismic Velocity Rippability Chart
Figure 4-1. Geologic Mapping of the Site Vicinity
Figure 4-2. Surface Conditions, Looking East from Lado De Loma Drive Figure 4-3. Surface Conditions, Looking South from Guajome Street Figure 4-4. Colluvium
Figure 4-5. Highly Weathered Tonalite
Figure 4-6. Less Weathered Tonalite
Figure 5-1. Faulting in the Site Vicinity
Figure 5-2. Landslide Risk in the Site Area
Figure 5-3. Flood Mapping of the Site Area
Figure 6-1. Sawed Contraction Joint
Figure 6-2. Conceptual Design for Wall Drainage
Figure 6-3. Areas of Select Granular Backfill for MSE Walls 10/24/2023 PH1 600 of 2254

Second Update Report of Geotechnical Investigation
Kensho Housing Residential Apartments, Vista, CA
NOVA Project No. 2021172
April 25, 2022
1 1. INTRODUCTION

1.1 Terms of Reference
This report presents the findings of an update geotechnical investigation for a proposed residential apartment building in the City of Vista, California. The proposed apartment building will be located on an approximately 4.6-acre, irregularly-shaped lot corresponding to APNs 179-024-09, 179-093-05, 179-093-18, 179-093-23, 179-093-30, 179-093-32, and 179-093-34 (hereinafter, ‘the site’). Figure 1-1 provides a graphic that depicts the site vicinity.

Figure 1-1. Vicinity Map
The work reported herein was completed by NOVA Services, Inc. (NOVA) for Tideline Partners in accordance with the scope of work detailed in NOVA’s proposal dated August 2, 2021, and January 7, 2022.

1.2 Previous Geotechnical Reporting

1.2.1 Work by Others
The site was previously investigated by others in two events, as described below. 10/24/2023 PH1 601 of 2254

Second Update Report of Geotechnical Investigation
Kensho Housing Residential Apartments, Vista, CA
NOVA Project No. 2021172
April 25, 2022
2 1. VME 2003. This work provides the findings of a 2003 geotechnical investigation (reference, Report of Geotechnical Investigation, Vinje & Middleton Engineering, 2003).

2. GSI 2016. Geosoils, Inc. utilized the findings of VME 2003, as well as its own subsurface exploration, to provide a 2016 geotechnical assessment of the site (reference, Geotechnical Evaluation, Proposed Kensho Housing Development, APN’s 179-093-18, 23, 30, 32, and 34, Lado De Loma Drive, Vista, CA 92083, Geosoils, Inc., WO 7089-A- SC, July 28, 2016, hereinafter ‘GSI 2016’).

Records of test pits and related laboratory testing reported in GSI 2016 have been reviewed by NOVA for this report. The recommendations provided herein supersede those of GSI 2016.

NOVA did not have access to VME 2003. However, records of the subsurface exploration reported by VME 2003 are included with GSI 2016 and were reviewed by NOVA.

1.2.2 Previous NOVA Reporting
NOVA provided an updated report of its geotechnical investigation of this site in a September 22, 2021 report (reference, Report, Update Geotechnical Investigation, Proposed Kensho Housing Residential Apartments, Lado De Loma Drive, Vista, California, NOVA Project 2018216, September 22, 2021, hereinafter, ‘NOVA 2021’).

Design concepts were updated since the submittal of NOVA 2021 to incorporate two additional parcels that have been acquired for this development. This report addresses the current design, expanding the subsurface investigation to address the additional parcels. The recommendations of this report update and supersede those provided in NOVA 2021.

1.3 Objectives, Scope, and Limitations of This Work

1.3.1 Objectives
The objectives of the work reported herein are twofold, as described below. x Objective 1, Geotechnical. Develop subsurface information conditions to supplement the findings of NOVA 2021, thereafter providing updated recommendations for geotechnical-related development, including earthwork, foundations, retaining walls, and pavements.
x Objective 2, Stormwater. Complete percolation testing in accordance with the requirements of the City of Vista sufficient to identify requirements for development of permanent stormwater infiltration Best Management Practices (‘stormwater BMPs’).

1.3.2 Scope
In order to accomplish the above objectives, NOVA undertook the task-based scope of work described below.
10/24/2023 PH1 602 of 2254

Second Update Report of Geotechnical Investigation
Kensho Housing Residential Apartments, Vista, CA
NOVA Project No. 2021172
April 25, 2022
3 1. Task 1, Background Review. Reviewed previous reporting and other readily available background data for the site. This documentation included geotechnical reports, topographic maps, geologic data, and development plans. Civil and architectural information was reviewed.

2. Task 2, Subsurface Exploration. A subsurface exploration supplementing that was completed for NOVA 2021 included the subtasks listed below. x Subtask 2-1, Reconnaissance. A site reconnaissance was undertaken prior to exploratory work. This work included layout of test pits and percolation test borings.

Underground Service Alert and a utility location contractor were notified for underground utility mark-out services.
x Subtask 2-2, Coordination. A specialty subcontractor was retained to excavate test pits and percolation test borings. NOVA coordinated with you regarding access for fieldwork.
x Subtask 2-3, Test Pits. Eight (8) test pits were excavated with a backhoe to determine the depth and extent of soils overlying formational tonalite (granitic) rock.

These were in addition to our previous 17 test pits.
x Subtask 2-4, Percolation Testing. Conceptual locations for permanent stormwater infiltration Best Management Practices (stormwater BMPs) have not been selected.

Feasibility level infiltration data was supplemented by testing an additional four (4) percolation test wells per City of Vista requirements to supplement the previous six (6) tests.
x Subtask 2-5, Well and Test Pit Closure. Following sampling and logging, the test pits and percolation test wells were backfilled and lightly compacted. x Subtask 2-6, Seismic Refraction Survey. In order to determine relative strength and excavation characteristics of the bedrock, a seismic refraction survey comprised of seven (7) seismic refraction lines was completed by a licensed geophysicist.

3. Task 3, Laboratory Testing. Index soil laboratory testing was used to support soil classification and estimates of soil behavior. Chemical testing addresses the potential that soils may be corrosive to embedded concrete or metals.

4. Task 4, Engineering Evaluations. The findings of Tasks 1 through 3 were directed toward assessment of requirements for geotechnical-related development, including earthwork, foundations, retaining walls, and pavements.

5. Task 5, Reporting. Submittal of this report concludes NOVA’s scope of services. The report provides a record of all work and geotechnical-related recommendations for earthwork, foundations, retaining walls, and pavements. 10/24/2023 PH1 603 of 2254

Second Update Report of Geotechnical Investigation
Kensho Housing Residential Apartments, Vista, CA
NOVA Project No. 2021172
April 25, 2022
4 1.3.3 Limitations
The construction recommendations included in this report are not final. Geotechnical and geologic studies are characterized by uncertainty. These recommendations are developed by NOVA using judgment and opinion, based upon the subsurface exploration. NOVA can finalize its recommendations only by observing actual subsurface conditions revealed during construction. NOVA cannot assume responsibility or liability for the report's recommendations if NOVA does not perform construction observation.

This report does not address any environmental assessment or investigation for the presence or absence of hazardous or toxic materials in the soil, soil gas, groundwater, or surface water within or beyond the site.

Appendix A to this report provides important additional guidance regarding the use and limitations of this report. This information should be reviewed by all users of the report

1.3.4 Understood Use
NOVA expects that the findings and recommendations provided herein will be utilized by Tideline Partners and its design team in decision-making regarding foundation-related design and construction.

1.4 Organization of this Report
The remainder of this report is organized as abstracted below. x Section 2 reviews available project information.
x Section 3 describes the field investigation and laboratory testing. x Section 4 describes the surface and subsurface conditions. x Section 5 reviews geologic, soil, and siting-related hazards common to this area of California, considering each for its potential to affect the planned development. x Section 6 provides recommendations for earthwork and foundation design. x Section 7 provides recommendations for pavements.
x Section 8 addresses design for stormwater infiltration. x Section 9 provides recommendations for geotechnical observation during construction x Section 10 lists the principal references utilized in the development of the report.

Figures and tables are embedded in the text of the report at the point which they are referenced.

Plate 1, provided immediately following the text of this report, shows the location of fieldwork in larger scale. Plate 2 provides geologic cross-sections. The report is supported by five appendices, as described below.
x Appendix A presents guidance regarding the use and limitations of this report. x Appendix B presents logs of NOVA’s test pits.
x Appendix C provides records of laboratory testing.
x Appendix D provides records of the geophysical survey. x Appendix E provides Worksheet C.4-1: Categorization of Infiltration Feasibility. 10/24/2023 PH1 604 of 2254

Second Update Report of Geotechnical Investigation
Kensho Housing Residential Apartments, Vista, CA
NOVA Project No. 2021172
April 25, 2022
5 2. PROJECT INFORMATION

2.1 Site Location
The proposed Kensho Housing site (hereinafter, also referenced as ‘the site’) is an approximately 4.6-acre irregularly-shaped lot corresponding to the following seven APNs: 179- 024-09 (212 Guajome Street), 179-093-05 (446 Lado De Loma), 179-093-18, -23, -32, and -34 (420 Lado De Loma Drive) in the City of Vista, CA. The site is bounded on the northwest by Guajome Street, the Sprinter rail line to the northeast, Lado De Loma Drive, and residential properties to the southwest.

The location and limits of the property are depicted on Figure 2-1.

Figure 2-1. Site Location and Limits
10/24/2023 PH1 605 of 2254

Second Update Report of Geotechnical Investigation
Kensho Housing Residential Apartments, Vista, CA
NOVA Project No. 2021172
April 25, 2022
6 2.2 Current and Historic Site Use

2.2.1 Current
As may be seen by review of Figure 2-1, the site is largely vacant, with the ground surface vegetated by grasses and weeds, and several trees. Single-family residential structures occupy the northern and southern parcels of the site.

The site consists of sloping terrain. Site elevations range from about +347 feet mean sea level (msl) in the north to about +430 feet msl in the south near Lado De Loma Drive.

2.2.2 Historic
Review of historic aerial photos dating to 1938 indicates that the site has not been developed since that time. The area of the site was largely used for agriculture (orchards) until about 1960 when residential development first emerged on properties surrounding the site. Figure 2-2 reproduces a 1938 aerial view of the site area.

Figure 2-2. Aerial View, 1938
(source: USDA (1938-05-11 - 1938-08-07))
10/24/2023 PH1 606 of 2254

Second Update Report of Geotechnical Investigation
Kensho Housing Residential Apartments, Vista, CA
NOVA Project No. 2021172
April 25, 2022
7 2.3 Planned Development

2.3.1 Design Basis
NOVA’s understanding of the planned development is based upon review of conceptual development plans contained in Kensho Housing, EDR Submittal by Safdie Rabines Architects, March 11, 2022 (hereinafter, ‘SRA 2022’).

2.3.2 Proposed Apartments
SRA 2022 depicts planning for a four-level residential apartment building with two levels of below- and above-grade parking. Additionally, a three-level apartment building comprised of micro units is proposed on the northern parcel (179-024-09-00, 212 Guajome Street).

Townhomes are still being considered for the site on APN 179-093-05-00 (446 Lado De Loma).

Figures 2-3 below and 2-4 on the following page provide a site elevation and a 3-D view, respectively, of the planned development.

Figure 2-3. Site Section of Planned Development
(source: SRA 2022)
10/24/2023 PH1 607 of 2254

Second Update Report of Geotechnical Investigation
Kensho Housing Residential Apartments, Vista, CA
NOVA Project No. 2021172
April 25, 2022
8 Figure 2-4. Planned Development
(source: SRA 2022)

2.3.3 Structural
Structural design has not been initiated for the planned apartment building. As is evident by review of Figure 2-4, current planning envisions the planned apartment building will include four levels of residences above two levels of parking.

As employed at this site, the two levels of the parking garage would be constructed of reinforced concrete. The residential units above the parking garage would be wood framed. The lowest level of the parking garage would include a ground-supported concrete slab.

Designed as described above, the structure might rise to about 55 feet above surrounding ground. Column loads to foundations (DL +LL) will vary with column spacing and other factors.

Based upon experience with analogous structures, NOVA expects that maximum interior column loads may range to about 600 kips. Exterior and corner column loads may be in the range of 150 to 400 kips. Interior shear walls developed around elevator shafts may be used to collect seismic and wind loads.

2.3.4 Planned Site Grading
Plate 2 – Geologic Cross Sections provides four cross-sections through the planned apartment building. These sections were developed with approximate elevations of finished floor of the garage level provided by the project civil engineer. This design has not been finalized to this point, such that the garage floor elevations should be understood to be for the purposes of illustration only.

As seen by review of the cross-sections, a significant amount of grading will be required to complete the project, including cuts up to 28 feet in depth to reach the garage floor elevation. 10/24/2023 PH1 608 of 2254

Second Update Report of Geotechnical Investigation
Kensho Housing Residential Apartments, Vista, CA
NOVA Project No. 2021172
April 25, 2022
9 Fills up to 6 feet are required to reach finish floor in the building, and up to 10 feet of fill will be required in the paved areas east of the building. These fills will be deeper once remedial grading of the loose fill and colluvial soils are performed.

The building pads will have ‘transition’ conditions wherein the west side of the building will be set in deep bedrock cuts, while the east side will be set in shallow cuts to shallow fill. Because of the existing sloping topography at the site, large retaining walls up to 28 feet in height will be constructed along the west side of the building to accommodate the lowest building levels. 10/24/2023 PH1 609 of 2254

Second Update Report of Geotechnical Investigation
Kensho Housing Residential Apartments, Vista, CA
NOVA Project No. 2021172
April 25, 2022
10 3. SUBSURFACE EXPLORATION AND LABORATORY TESTING

3.1 Overview
A subsurface exploration was completed under the direction of a NOVA geologist in three events during August 2021 and April 2022, as described below.

1. Geophysical. Seven (7) geophysical seismic lines were completed on August 7, 2021 and April 4, 2022.

2. Test Pits. Twenty-five (25) test pits were excavated by a backhoe. Seventeen (17) test pits were completed on August 10, 2021, and eight (8) additional test pits were completed on January 12, 2022.

3. Percolation Testing. Percolation testing was completed at six (6) locations on August 11, 2021, and an additional four (4) locations on January 13, 2022.

In addition to the above, GSI 2016 reports the findings of seven (7) test pits (TP-1 through TP-7) completed for a June 2016 geotechnical investigation. Figure 3-1 presents a plan view of the site indicating the location of the subsurface explorations described above. Plate 1, provided immediately following the text of this report, shows the location of this work in larger scale.

Figure 3-1. Locations of Subsurface Explorations
10/24/2023 PH1 610 of 2254

Second Update Report of Geotechnical Investigation
Kensho Housing Residential Apartments, Vista, CA
NOVA Project No. 2021172
April 25, 2022
11 The remainder of this section describes the work by NOVA, the test pits reported in GSI 2016, and laboratory testing by NOVA and GSI 2016.

3.2 Test Pits

3.2.1 Test Pits by NOVA
A NOVA geologist directed excavation and sampling of 25 test pits (TP-1 through TP-25) to depths between 2 feet and 8 feet below ground surface (bgs) on August 10, 2021, and on January 12, 2022. Prior to beginning fieldwork, excavation locations were determined by a geologist based on the proposed building configuration at the site. The test pits were excavated using a track-mounted mini-excavator. Table 3-1 provides a summary of the test pits.

Table 3-1. Summary of the Test Pits by NOVA
Test Pit
Reference
Approx.

Ground
Surface Elev.
(feet, msl)
Total Depth
Below
Ground
Surface (feet)
Thickness
of Fill
(feet)
Thickness
Colluvium
(feet)
Depth to
Tonalite (feet)
TP-1 +367 4.5 1.5 2.5 4
TP-2 +366 5.5 2 3 5
TP-3+365522.54.5
TP-4+363522.54.5
TP-5 +377 3 0 to 1 0 to 1 1
TP-6 +374 2 0 1 1
TP-7 +367 2.5 1 1 2
TP-8 +363 4.5 1.5 2.5 4
TP-9 +358 4 1.5 2 3.5
TP-10+373605 5
TP-11+373614 5
TP-12 +375 8 1 6.5 7.5
TP-13 +380 6-7 2 to 3 2 to 3 6
TP-14+405201 1
TP-15+411302 2
TP-16 +393 2 0 2 2
TP-17 +383 4 0 3 3
TP-18 +358 6 2.5 2.5 5
TP-19 +352 6 3 2.5 5.5
TP-20 +407 4 0 1.5 1.5
TP-21 +427 3 0 0 0
TP-22 +420 8 8 0 8
TP-23 +395 4 0 1 1
TP-24 +368 5 0 2 2
TP-25 +363 4 0 1 1
10/24/2023 PH1 611 of 2254

Second Update Report of Geotechnical Investigation
Kensho Housing Residential Apartments, Vista, CA
NOVA Project No. 2021172
April 25, 2022
12 Following excavation and logging, the test pits were backfilled with the excavated soil and lightly compacted. Test pit logs by NOVA are presented in Appendix B. Figure 3-2 depicts test pit excavation operations.

Figure 3-2. Test Pit Excavation (TP-5, August 2021)

3.2.2 Test Pits by Others
GSI 2016
GSI 2016 reports the findings of seven (7) test pits (TP-1 through TP-7) excavated by a backhoe in June 2016 at the locations depicted on Figure 3-1. Table 3-2 (following page) provides a summary of the test pits by GSI.

No groundwater was encountered during excavation of the test pits.

VME 2003
GSI 2016 also provides the records of two (2) test pits (‘T-101’ and ‘T-102’) completed by Vinje & Middleton Engineering (VME) in 2003. The report associated with that work is not available to NOVA, such that the locations of these test pits are uncertain and not shown on Figure 3-1.
10/24/2023 PH1 612 of 2254

Second Update Report of Geotechnical Investigation
Kensho Housing Residential Apartments, Vista, CA
NOVA Project No. 2021172
April 25, 2022
13 Table 3-3 summarizes the material encountered in the test pits. No groundwater was encountered during excavation of the test pits by VME.

Table 3-2. Summary of the Test Pits Reported by GSI 2016 Test Pit
Reference
Approx.

Ground
Surface Elev.
(feet, msl)
Total Depth
Below
Ground
Surface (feet)
Thickness
of Fill
(feet)
Thickness
Colluvium
(feet)
Depth to
Weathered
Tonalite (feet)
TP-1 +355 8 3 1.5 4.5
TP-2 +363 5 0 2.5 2.5
TP-3 +378 8 0 2 2
TP-4 +376 8 3 3 6
TP-5 +395 5 0 3 3
TP-6 +405 5 0 2.5 2.5
TP-7 +385 4 0 2.5 2.5
Table 3-3. Summary of the Trenches Reported by VME 2003 Trench
Reference
Approx.

Ground
Surface Elev.
(feet, msl)
Total Depth
Below
Ground
Surface (feet)
Thickness
of Fill
(feet)
Thickness
Colluvium
(feet)
Depth to
Weathered
Tonalite (feet)
T-101 Not reported 7 3.5 3 6.5
T-102 Not reported 7 7 0 7

3.3 Percolation Testing

3.3.1 General
NOVA directed the excavation and construction of ten (10) percolation test borings, following the recommendations for percolation testing presented in the City of Vista BMP Design Manual.

The locations of these borings are shown on Figure 3-1.

3.3.2 Drilling
Borings were drilled with a backhoe-mounted 8-inch solid stem auger to depths of 5 to 6 feet bgs. Field measurements were taken to confirm that the borings were excavated to approximately 8 inches in diameter. The borings were logged by a NOVA geologist, who observed and recorded exposed soil cuttings and the boring conditions. Logs of the exploratory percolation test borings are provided in Appendix B.

3.3.3 Conversion to Percolation Wells
Once the test borings were drilled to the design depth, the borings were converted to percolation wells by placing an approximately 2-inch layer of ¾-inch gravel on the bottom, then 10/24/2023 PH1 613 of 2254

Second Update Report of Geotechnical Investigation
Kensho Housing Residential Apartments, Vista, CA
NOVA Project No. 2021172
April 25, 2022
14 extending 3-inch diameter Schedule 40 perforated PVC pipe to the ground surface. The ¾-inch gravel was used to fill the annular space around the perforated pipe to at least 12 inches below existing finish grade to minimize the potential of soil caving.

Figure 3-3 (following page) depicts the percolation test well setup.

3.3.4 Percolation Testing
In percolation boring P-1 through P-4 and P-7 through P-10, the pre-soak water did not percolate over 6 inches into the soil unit within 25 minutes. In percolation borings P-5 and P-6, the pre-soak water did percolate over 6 inches into the soil unit within 25 minutes. Based on the results of the trials, water levels were recorded every 30 minutes for 6 hours in borings P-1 through P-4, and every 10 minutes for 1 hour in boring P-5 and P-6. At the beginning of each test interval, the water level was raised to approximately the same level as the previous tests, in order to maintain a near-constant head during all test periods.

Table 3-4 summarizes the percolation test conditions and infiltration rates calculated using the Porchet method.

Table 3-4. Percolation Testing by NOVA
Boring
Reference
Approximate
Elevation
(feet, msl)
Total
Depth
(feet)
Approximate
Percolation
Test
Elevation
(feet, msl)
Subsurface
Unit
Tested1
Infiltration
Rate
(in/hr)
Infiltration
Rate
(in/hr,
FS=2)2
P-1 +354 5 +349 Qcol 0.06 0.03
P-2 +355 6 +349 Qcol 0.10 0.05
P-3 +364 6 +358 Kt 0.12 0.06
P-4 +365 5 +360 Kt 0.06 0.03
P-5 +369 6 +363 Qcol 2.99 1.49
P-6 +370 5.5 +364.5 Qcol 2.32 1.16
P-7 +362 5 +357 Kt 0.12 0.06
P-8 +362 5 +357 Kt 0.69 0.34
P-9 +371 5 +365.5 Qcol 0.16 0.08
P-10 +371 5 +365.5 Qcol 0.38 0.19
Note 1: The referenced subsurface units tested Colluvium (Qcol), and Cretaceous Tonalite (Kt) Note 2: ‘FS’ indicates ‘Factor of Safety’.

As may be seen by review of Table 3-4, a factor of safety (FS) is applied to the infiltration rate (I) determined by the percolation testing. This factor of safety, at least FS = 2 in local practice, considers the nature and variability of subsurface materials, as well as the natural tendency of infiltration structures to become less efficient with time. The calculated infiltration rates after applying FS = 2 range from 0.03 to 1.49 inches per hour.

The infiltration feasibility of the site is discussed in Section 8 of this report and infiltration worksheets are presented in Appendix E.
10/24/2023 PH1 614 of 2254

Second Update Report of Geotechnical Investigation
Kensho Housing Residential Apartments, Vista, CA
NOVA Project No. 2021172
April 25, 2022
15 3.3.5 Closure
At the conclusion of the percolation testing, the upper sections of the PVC pipe were removed and the resulting holes backfilled with soil cuttings to match the existing surface.

Figure 3-3. Percolation Testing, August 2021

3.4 Seismic Refraction Survey

3.4.1 General
As currently designed, proposed cuts to reach the finish floor elevation of the parking structures at the site are up to 28 feet deep. Accordingly, a seismic refraction survey was undertaken to estimate the quality of rock that occurs within this depth limit. As employed in this instance, the objective of the testing was to identify the seismic wave velocities of the subsurface materials to both (i) identify the occurrence of soil and rock, and (ii) characterize the requirements for loosening/excavation of the bedrock. Figure 3-4 (following page) depicts the principles of seismic refraction testing as employed in this instance.

Seven (7) seismic refraction lines, aligned as shown on Figure 3-1 and Plate 1, were performed for a seismic refraction survey on August 7, 2021 and April 4, 2022. The seismic refraction survey results are provided in Appendix D.

Seismic refraction relies on measurements of the travel times of seismic waves traveling through and refracting from subsurface layers with contrasting densities. Seismic waves are introduced to the subsurface by striking a steel plate at the surface with a heavy hammer and measuring seismic wave reception from each geophone. ‘Geophones’ spaced at regular intervals intercept the seismic waves traveling through and reflecting off of the subsurface media. The data is then processed and interpreted using seismic interpretation software. 10/24/2023 PH1 615 of 2254

Second Update Report of Geotechnical Investigation
Kensho Housing Residential Apartments, Vista, CA
NOVA Project No. 2021172
April 25, 2022
16 The seismic refraction surveys conducted for this project are used to measure the seismic compression velocity (‘P-wave’) and estimate the rippability of the subsurface stratigraphy. The measurements of seismic velocity can be used to estimate the relative difficulty of excavating rock and rock-like materials.

Figure 3-4. Seismic Refraction Geometry
This data provides an estimate of the degree of ‘rippability’, a semi-quantitative assessment of the potential for mechanical loosening of rock so that the rock may be excavated. Figure 3-5 (following page) provides an example of the tomographic model determined by the refraction testing at line S-2.
10/24/2023 PH1 616 of 2254

Second Update Report of Geotechnical Investigation
Kensho Housing Residential Apartments, Vista, CA
NOVA Project No. 2021172
April 25, 2022
17 Figure 3-5. Subsurface Profile along Seismic Line S-2

3.4.2 Indications of the Seismic Lines
The seismic traverses indicate the following sequence of subsurface materials. It is important to note that the degree of weathering is highly variable across the length of the lines, as may be seen in Figure 3-5 at the horizontal distance of 10 feet, where the 8,000 feet/second tomographic line is encountered approximately 20 feet higher than below the rest of the profile.

1. Seismic Unit V1, Colluvium and Fill. A near-surface layer of colluvium and fill mantles the site to depths of approximately 5 feet. The average velocity of this unit is about 1,360 feet/second (fps), typical for such soils.

2. Seismic Unit V2, Weathered Tonalite. The near-surface layer of colluvium and fill is underlain by weathered tonalite rock, with seismic velocities of about 3,600 fps to 6,000 fps. These velocities reflect weathered, fractured bedrock. This unit extends to a depth of typically 10 to 12 feet below existing grade.

3. Seismic Unit V3, Less Weathered Tonalite. Below about 10 to 15 feet depth, the site is underlain by relatively sound, less weathered igneous bedrock. The seismic velocity anticipated for the deep removals at the site are between 6,000 to 7,000 feet/second, bordering on marginally rippable.

It is important to understand that seismic velocity is influenced by many factors, such as the presence of moisture and rock fractures. Similarly, the rippability of a rock mass is controlled by numerous parameters including strength, weathering and the spacing of discontinuities/fractures.
10/24/2023 PH1 617 of 2254

Second Update Report of Geotechnical Investigation
Kensho Housing Residential Apartments, Vista, CA
NOVA Project No. 2021172
April 25, 2022
18 Measured seismic velocity models may be compared to empirically derived rippability charts such as those published by Caterpillar Inc. Figure 3-6 (following page) is taken from the Caterpillar Performance Handbook. This table provides a rough correlation of rippability for a D10 bulldozer as a function of the seismic velocity of the subsurface material.

Typically, weathered rocks, highly stratified rocks, and rocks with extensive fracturing are rippable. Conversely, massive or crystalline rocks (such as the tonalite that underlies this site) and rocks with few planes of weakness are typically less rippable. The tonalite that underlies the site is a granitic-type igneous rock. Therefore, the “granite” correlation in the chart of Figure 3-6 can be used to estimate the rippability of the rock beneath the site.

This chart indicates that up to a velocity of 7,100 feet per second (fps) the material is rippable, between approximately 7,100 and 8,500 fps the rock is marginally rippable, requiring special breaking techniques, and more than 8,500 fps, the rock will likely require blasting.

Despite the correlations presented in this chart that addresses rippability, it is important to understand that these correlations are empirical. Actual rippability may vary from that forecast by the chart.

Figure 3-6. D10 Seismic Velocity Rippability Chart
(source: Caterpillar Performance Handbook, 2019)
10/24/2023 PH1 618 of 2254

Second Update Report of Geotechnical Investigation
Kensho Housing Residential Apartments, Vista, CA
NOVA Project No. 2021172
April 25, 2022
19 3.5 Laboratory Testing

3.5.1 General
Soil samples recovered from the engineering borings were transferred to NOVA’s geotechnical laboratory where a geotechnical engineer reviewed the soil samples and the field logs.

Representative soil samples were selected and tested in NOVA’s materials laboratory to check visual classifications and to determine pertinent engineering properties.

The laboratory program included visual classifications of all soil samples, as supported by index testing in general accordance with ASTM standards. The visual classifications were further evaluated by performing grain size, plasticity, and expansivity tests. The index testing may be also used to estimate a variety of soil characteristics and physical properties. The remainder of this section provides the results of the laboratory by NOVA and the laboratory testing reported in GSI 2016. Records of the geotechnical laboratory testing are provided in Appendix C.

3.5.2 Gradation
Mechanical gradation analyses were completed on samples of the fill and the colluvium. Table 3-5 provides a summary of the gradation testing by NOVA and the testing reported in GSI 2016.

Table 3-5. Soil Gradation Testing
Source Boring Depth
(feet)
Soil
Description
Passing
#2001
Classification After
ASTM D2487
GSI TP-2 3 Silty sand 32 SM
GSI TP-7 3 Silty sand 7 SM
NOVA TP-9 3.5-4 Clayey sand 48 SC
NOVA TP-10 1-3 Sandy clay 60 CL
NOVA TP-12 3-7 Silty sand 30 SM
Note: ‘Passing #200’ percent by weight passing the U.S. # 200 sieve (0.074 mm), after ASTM D6913.

3.5.3 Maximum Density and Optimum Moisture
Samples of near-surface soils to determine moisture-density relationship after ASTM D1557 (the ‘modified Proctor’) were tested by NOVA and reported in GSI 2016. Table 3-6 summarizes the results of this testing.

Table 3-6. Maximum Density and Optimum Moisture Testing Source Test
Pit
Depth
(feet)
Soil
Description
Maximum Dry
Density (pcf)
Optimum Moisture
Content (%)
GSI TP-2 2 – 3 Brown silty sand 130 10
GSI TP-7 3 Yellow-brown silty sand 132 9
NOVA TP-5 2 – 3 Orange-brown silty sand 131.7 9
NOVA TP-12 3 – 7 Orange-brown silty sand 132.2 8
NOVA TP-13 0 – 3 Dark brown clayey sand 133.9 6.6
10/24/2023 PH1 619 of 2254

Second Update Report of Geotechnical Investigation
Kensho Housing Residential Apartments, Vista, CA
NOVA Project No. 2021172
April 25, 2022
20 3.5.4 Plasticity and Expansion Potential
Localized portions of the fill and colluvium in the near subsurface are clayey. Plasticity and expansion potential testing were undertaken to characterize these soils.

Atterberg Limit testing after ASTM D4318 was completed on representative samples of colluvium to assess its plasticity. Table 3-7 tabulates the results of this testing.

Table 3-7. Atterberg Limits
Test
Pit
Depth
(feet)
Liquid
Limit
Plastic
Limit
Plasticity
Index
Natural
Moisture (%)
USGS Soil
Type
TP- 9 3.5 - 4 36 17 19 5.1 CL
TP-10 1 - 3 43 16 27 6.8 CL
Testing to address the expansion potential of this same soil is reported in GSI 2016. Testing to determine Expansion Index (EI) after ASTM D4829 showed EI < 20, indicating a soil of Very Low expansion potential.

3.5.5 Direct Shear
Direct shear testing was completed by both GSI 2016 and NOVA. GSI 2016 reports the results of two remolded samples that were tested in direct shear after ASTM D3080. Table 3-8 summarizes the testing reported in GSI 2016.

Table 3-8. Direct Shear Testing, GSI 2016
Source Test
Pit
Depth
(feet)Soil Description
Peak Residual
Friction
Angle (°)
Cohesion
(psf)
Friction
Angle (°)
Cohesion
(psf)
GSI TP-2 2-3 Brown silty sand 32 218 32 166
GSI TP-7 3 Brown silty sand 40 210 34 189

3.5.6 R-Value Testing
The R-Value for near-surface soils in the paved area was evaluated in general accordance with California Test (CT) 301 and ASTM D2844. Table 3-9 presents the result.

Table 3-9. R-Value
Test
Pit
Depth
(feet)R-Value Soil Description
TP-13 0-3 44 Dark brown silty sand
10/24/2023 PH1 620 of 2254

Second Update Report of Geotechnical Investigation
Kensho Housing Residential Apartments, Vista, CA
NOVA Project No. 2021172
April 25, 2022
21 3.5.7 Chemical Testing
Electrical resistivity, chloride content, and pH level are all indicators of the soil’s tendency to corrode ferrous metals. Water-soluble sulfates are used as an index of the potential for sulfate attack to concrete. These chemical tests were completed by both GSI 2016 and NOVA, as summarized on Table 3-10. This testing is discussed in more detail in Section 6.3.

Table 3-10. Chemical Testing
Source
Sample Ref
pH Resistivity
(Ohm-cm)
Sulfates Chlorides
Test
Pit
Depth
(feet)ppm %ppm %
GSI TP-2 2 - 3 8.8 660 170 0.017 180 0.018
NOVA TP-10 1 - 3 8.3 730 <30 <0.00 21 0.002
NOVA TP-15 2 - 3 8.2 17000 <30 <0.00 43 0.004
10/24/2023 PH1 621 of 2254

Second Update Report of Geotechnical Investigation
Kensho Housing Residential Apartments, Vista, CA
NOVA Project No. 2021172
April 25, 2022
22 4. SITE CONDITIONS

4.1 Geologic Setting

4.1.1 Regional
The site is located in the Peninsular Range geomorphic province. This geomorphic province encompasses an area that extends approximately 900 miles from the Transverse Ranges and the Los Angeles Basin south to the southern tip of Baja California. The province varies in width from approximately 30 to 100 miles. The project area is located on the boundary of the Coastal Plains and Foothills physiographic provinces.

The western portion of this area of the province has undergone several episodes of marine inundation and subsequent marine regression (coastline changes) throughout the last 54 million years. These events have resulted in the deposition of a thick sequence of marine and nonmarine sedimentary rocks on the basement igneous rocks of the Peninsular Ranges batholith and the metamorphic rocks into which the batholith was intruded.

Gradual emergence of the region from the sea occurred in Pleistocene time, and numerous wave-cut platforms, most of which were covered by relatively thin marine and nonmarine terrace deposits, formed as the sea receded from the land. Accelerated fluvial erosion during periods of heavy rainfall, along with the lowering of base sea level during Quaternary times, resulted in the rolling hills, mesas, and deeply incised canyons that characterize the landforms in western San Diego County.

The site lies within the Foothills physiographic province of San Diego County. The Foothills physiographic province can be generalized as granitic-type rocks of the Southern California batholith, which were intruded to the pre-existing Mesozoic volcanic and sedimentary rocks, often displaying low-grade metamorphism near the contacts.

4.1.2 Site Specific
Generally, the site is underlain (from ground surface downward) by a sequence of artificial fill, colluvium, and Cretaceous-aged tonalite (Kt), a granitic-type bedrock.

Where encountered, the artificial fill and colluvium range in thicknesses from less than 1 foot up to 8 feet bgs.

Figure 4-1 (following page) reproduces mapping of the surface geologic units in the site vicinity. 10/24/2023 PH1 622 of 2254

Second Update Report of Geotechnical Investigation
Kensho Housing Residential Apartments, Vista, CA
NOVA Project No. 2021172
April 25, 2022
23 Figure 4-1. Geologic Mapping of the Site Vicinity

4.2 Surface, Subsurface, and Groundwater

4.2.1 Surface
The project site is largely vacant, with surface vegetated by grasses and weeds, and several trees are located across the site. Single-family residential structures occupy the northern and southern parcels of the site. Smaller erosional features are evident in areas of a steeper topographic gradient.

The site is characterized by a relatively sloping ground surface. The steepest topographic gradients range from about +360 feet mean sea level (msl) at the eastern periphery of the site to about +430 feet msl at Lado De Loma Drive, a surface gradient of about 20%.

Relatively unweathered outcrops of tonalite are visible at the surface in some areas across the site. Figures 4-2 and 4-3 (following page) depict surface conditions. 10/24/2023 PH1 623 of 2254

Second Update Report of Geotechnical Investigation
Kensho Housing Residential Apartments, Vista, CA
NOVA Project No. 2021172
April 25, 2022
24 Figure 4-2. Surface Conditions, Looking East from Lado De Loma Drive Figure 4-3. Surface Conditions, Looking South from Guajome Street 10/24/2023 PH1 624 of 2254

Second Update Report of Geotechnical Investigation
Kensho Housing Residential Apartments, Vista, CA
NOVA Project No. 2021172
April 25, 2022
25 4.2.2 Subsurface
Subsurface conditions indicated by this investigation, as well as by GSI 2016 may be generalized to occur as the sequence of soil units in the near subsurface as described below.

Artificial Fill (Afu). The undocumented artificial fill encountered at the site is generally found in three localized zones, which are presented on Plate 1 – Subsurface Investigation Map. Fill in the two eastern areas are less than 3 feet in thickness, observed to be grayish-brown silty sand with gravel of loose consistency. Some construction debris was observed within the fill.

In the southern portion of the site, the fill encountered was 8 feet deep. This fill was used to create an area for the residence located along Lado De Loma Drive. In this area, the fill was observed to be dark brown to dark red-brown silty fine to medium-grained sand with abundant refuse and construction debris. This undocumented soil is at risk for wide variations in quality and consistency.

Quaternary Colluvium (Qcol). The colluvium was encountered either below the fill or from the surface in all borings except TP-21. This unit was generally observed to be olive to reddish-brown silty sand and brown to dark brown clayey sand and sandy clay of loose/soft to medium dense in consistency/relative density. The unit was generally porous with some gravel and cobbles encountered. The colluvium is depicted on Figure 4-4.

Figure 4-4. Colluvium
10/24/2023 PH1 625 of 2254

Second Update Report of Geotechnical Investigation
Kensho Housing Residential Apartments, Vista, CA
NOVA Project No. 2021172
April 25, 2022
26 Cretaceous Tonalite (Kt). This unit underlies the entire site and was encountered in all test pits. The upper portion of this unit is generally highly weathered and excavates to medium dense to dense medium to coarse-grained, light yellow-brown to grayish silty sand. This soil is derived from in-place weathering of the parent tonalite (Kt). The degree of weathering diminishes with depth. The seismic refraction lines performed by NOVA indicate the bottoms of the deep excavations will be in marginally rippable material with velocities between 6,000 to 7,000 feet per second. Appendix D presents the findings from the seismic lines performed in the locations of the deepest cuts.

Based on NOVA’s extensive experience with grading in this tonalite unit, localized highly unweathered zones (core stones, or floaters) are commonly encountered in the tonalite that require extra effort and time to remove from the surrounding more weathered rock.

Figure 4-5 depicts the highly weathered tonalite at the bottom of Test Pit TP-5 and Figure 4-6 (following page) presents a sample of the less weathered tonalite encountered during the investigation.

Figure 4-5. Highly Weathered Tonalite
10/24/2023 PH1 626 of 2254

Second Update Report of Geotechnical Investigation
Kensho Housing Residential Apartments, Vista, CA
NOVA Project No. 2021172
April 25, 2022
27 Figure 4-6. Less Weathered Tonalite

4.2.3 Groundwater
Groundwater was not encountered in any of the test pits by NOVA or in the test pits reported in GSI 2016. Groundwater is not anticipated to be a constraint to development. Although not encountered within the subsurface explorations, seepage from perched groundwater may be encountered locally in excavations especially in landscaping and sloping areas of the site. If dewatering is necessary, the dewatering method should be evaluated and implemented by an experienced dewatering subcontractor.

Infiltrating stormwater can ‘perch’ atop localized zones of lower permeability soil that exist above the static groundwater level. Localized perched groundwater conditions may also develop once site development is complete and landscape irrigation commences. These perched water issues are difficult to predict but may be mitigated if the need arises.

4.2.4 Surface Water
NOVA did not observe any evidence of seeps, springs, or surface staining that would suggest the recent problems with surface water on the site. As is common for the area, smaller erosional features are evident in areas of a steeper topographic gradient. 10/24/2023 PH1 627 of 2254

Second Update Report of Geotechnical Investigation
Kensho Housing Residential Apartments, Vista, CA
NOVA Project No. 2021172
April 25, 2022
28 5. REVIEW OF GEOLOGIC, SOIL, AND SITING HAZARDS

5.1 Overview
This section provides review of geologic, soils, and siting-related hazards common to this region of California, considering each for its potential to affect the planned construction.

The review identified two primary hazards, as abstracted below.

1. Hazard 1, Strong Ground Motion. This site is at risk for moderate-to-severe ground shaking in response to either a local moderate or more distant large-magnitude earthquake. While there is no risk of liquefaction or related seismic phenomena, strong ground motion could affect the site.

2. Hazard 2, Undocumented Fill. The area of the planned building addition is locally underlain by undocumented fill that locally extends to depths of about 8 feet depth but maybe thicker in unexplored areas of the site. No records exist regarding placement of this fill, such that the fill is considered ‘undocumented’, at risk for wide variations in quality and consistency. Unmanaged by design, the fill colluvium may be compressible under loads from the new structure.

3. Difficult Excavation. Based on the seismic refraction lines, the majority of material to be excavated is considered rippable near the surface, to marginally rippable at the bottoms of the excavations. Sound tonalite rock underlies the entire site. Locally, this rock occurs within the near subsurface, and may be encountered within depths planned for excavation for building pads and infrastructure. The sound rock may locally be difficult to loosen for removal, adding cost and time to the planned earthwork.

The following subsections detail the geologic, soils, and siting-related hazards that may affect the planned improvements to the site.

5.2 Geologic Hazards

5.2.1 Strong Ground Motion
The site is located in a seismically active area, as is the majority of southern California, and the potential for strong ground motion is considered significant during the design life of the proposed structure. Major known active faults in the region consist generally of en echelon, northwest striking, right-lateral, strike-slip faults. These include the San Andreas, Elsinore, and San Jacinto faults located northeast of the site, and the San Clemente, San Diego Trough, and Agua Blanca-Coronado Bank faults located to the west of the site.

The tectonic setting of western San Diego County includes major north and northwest striking fault zones, the most prominent and active of which is the Newport-Inglewood-Rose Canyon Fault Zone (NIRC). The NIRC includes offshore faulting from Newport Beach southeastward past North San Diego County until it returns back onshore at La Jolla Cove. 10/24/2023 PH1 628 of 2254

Second Update Report of Geotechnical Investigation
Kensho Housing Residential Apartments, Vista, CA
NOVA Project No. 2021172
April 25, 2022
29 The seismicity of the site was evaluated utilizing the Seismic Design Maps web-based analytical tool provided by Structural Engineers Association of California (SEA) and California’s Office of Statewide Health Planning and Development (OSHPD). The USGS Unified Hazard Tool indicates the site may be subjected to a Magnitude 6.9 seismic event, with a corresponding site- adjusted Peak Ground Acceleration (PGAM) of 0.474g.

5.2.2 Fault Rupture
Earthquake Fault Zones (formerly known as special study zones) have been established along known active faults in California in accordance with the Alquist-Priolo Earthquake Fault Zoning Act. The site is not located in an Alquist-Priolo Earthquake Fault Zone. No active surface faults are mapped across the site. The nearest active fault is the Oceanside section of the NIRC fault zone, located approximately 10.9 miles to the southwest. Evidence of active faulting was not observed at the site during the time of the field evaluation. No active faults are known to underlie or project toward the site. The probability of fault rupture is considered very low.

Figure 5-1 shows the locations of known faults in the general site area.

Figure 5-1. Faulting in the Site Vicinity
(Source: USGS US Quaternary Fault Database)
10/24/2023 PH1 629 of 2254

Second Update Report of Geotechnical Investigation
Kensho Housing Residential Apartments, Vista, CA
NOVA Project No. 2021172
April 25, 2022
30 5.2.1 Landslide
As used herein, ‘landslide’ describes downslope displacement of a mass of rock, soil, and/or debris by sliding, flowing, or falling. Such mass earth movements are greater than about 10 feet thick and larger than 300 feet across. Landslides typically include cohesive block glides and disrupted slumps that are formed by translation or rotation of the slope materials along one or more slip surfaces. These mass displacements can also include similarly larger scale, but more narrowly confined modes of mass wasting such as ‘mud flows’ and ‘debris flows’.

The causes of classic landslides start with a preexisting condition - characteristically, a plane of weak soil or rock inherent within the rock or soil mass. Thereafter, movement may be precipitated by earthquakes, wet weather, and changes to the structure or loading conditions on a slope (e.g., by erosion, cutting, filling, release of water from broken pipes, etc.).

Geologic reconnaissance, geologic mapping, and review of aerial photography indicated no evidence of active or dormant landsliding. Further clues to landslide hazards can also be obtained by review of mapping that depicts both historic landslides and landslide-prone topography. Figure 5-2 reproduces such mapping for the site area. The mapping indicates that the site is in an area judged to be ‘marginally susceptible’ to landsliding.

Figure 5-2. Landslide Risk in the Site Area
(source: adapted from Tan 1995)
10/24/2023 PH1 630 of 2254

Second Update Report of Geotechnical Investigation
Kensho Housing Residential Apartments, Vista, CA
NOVA Project No. 2021172
April 25, 2022
31 In consideration of the inherent stability of the formational tonalite, geologic reconnaissance, and review of published information, NOVA considers the site to be at low risk for landsliding in its current configuration.

5.2.2 Ground Lurching
Seismically induced ground lurching occurs when weaker soil masses move at right angles to a cliff or steep slope in response to seismic waves. Structures built on these masses can experience significant lateral and vertical deformations if ground lurching occurs.

The phenomenon is usually associated with soft, unconsolidated soils with low cohesion adjacent to a slope. The occurrence of weathered and unweathered granitic rock in the subsurface suggests the site is not at risk for ground lurching.

5.3 Soil Hazards

5.3.1 Embankment Stability
As used herein, ‘embankment stability’ is intended to mean the safety of localized natural or man-made embankments against failure. Unlike landslides described above, embankment stability can include smaller scale slope failures such as erosion-related washouts and more subtle, less evident processes such as soil creep.

No new slopes are planned as part of the site improvements.

5.3.2 Seismic
Liquefaction
‘Liquefaction’ refers to the loss of soil strength during a seismic event. The phenomenon is observed in areas that include geologically ‘younger’ soils (i.e., soils of Holocene age), shallow water table (less than about 60 feet in depth), and cohesionless (i.e., sandy and silty) soils of looser consistency. The seismic ground motions increase soil water pressures, decreasing grain-to-grain contact among the soil particles, which causes the soils to lose strength.

Resistance of a soil mass to liquefaction increases with increasing density, plasticity (associated with clay-sized particles), geologic age, cementation, and stress history.

The dense to very dense tonalite rock at this site has no potential for liquefaction.

Seismic Compression
Apart from liquefaction, a strong seismic event can induce settlement within loose to moderately dense, unsaturated granular soils (‘seismic compression’). The tonalite will not be prone to settlement driven by seismic compression. 10/24/2023 PH1 631 of 2254

Second Update Report of Geotechnical Investigation
Kensho Housing Residential Apartments, Vista, CA
NOVA Project No. 2021172
April 25, 2022
32 5.3.3 Expansive Soil
Expansive soils are characterized by their ability to undergo significant volume changes (shrinking or swelling) due to variations in moisture content. These volume changes can be damaging to structures. Nationally, the value of property damage caused by expansive soils is exceeded only by that caused by termites.

As is discussed in Section 3, the fill and colluvial soils have been characterized by testing to determine Expansion Index (‘EI’, after ASTM D4829). EI has been adopted by the California Building Code (‘CBC’, Section 1803.5.3) for characterization of expansive soils. Table 5-1 tabulates the qualitative descriptors of expansion potential based upon EI.

Testing to address the expansion potential of the colluvium is reported in GSI 2016. Testing to determine Expansion Index (EI) after ASTM D4829 showed EI 130 Very high

5.3.4 Hydro-Collapsible Soils
Hydro-collapsible soils are common in the arid climates of the western United States in specific depositional environments - principally in areas of young alluvial fans, debris flow sediments, dune sands, and loess (wind-blown sediment) deposits. These soils are characterized by low in situ density, low moisture contents, and relatively high unwetted strength.

The soil grains of hydro-collapsible soils were initially deposited in a loose state (i.e., high initial ‘void ratio’) and thereafter lightly bonded by water-sensitive binding agents (e.g., clay particles, low-grade cementation, etc.). While relatively strong in a dry state, the introduction of water into these soils causes the binding agents to fail. Destruction of the bonds/binding causes relatively rapid densification and volume loss (collapse) of the soil. This change is manifested at the ground surface as subsidence or settlement. Ground settlements from the wetting can be damaging to structures and civil works.

Tonalite is not potentially hydro-collapsible, however, the existing fill and colluvial materials may be. Remedial grading recommendations for these materials are presented in the next section of the report.
10/24/2023 PH1 632 of 2254

Second Update Report of Geotechnical Investigation
Kensho Housing Residential Apartments, Vista, CA
NOVA Project No. 2021172
April 25, 2022
33 5.3.5 Near Surface Rock
Tonalite, a granitic-type rock, underlies the entire site. This rock occurs within the near subsurface, within depths planned for excavation of building pads and infrastructure. The majority of this rock is weakened by weathering and will be excavatable by larger earthwork equipment in good working condition with experienced operators. However, localized zones of sound rock resistant to weathering will be encountered. These core stones and floaters should be expected to be difficult to loosen for removal, adding cost and time to the planned earthwork.

In addition, the seismic refraction surveys indicate that marginally rippable to unrippable zones of tonalite are as shallow as 20 feet below ground surface. At this time cuts up to 35 feet are planned. Given the variability in the density of the underlying rock, difficult excavation (with the possibility of blasting) should be anticipated with cuts of this depth.

5.4 Siting Hazards

5.4.1 Effect on Adjacent Properties
The proposed development will not affect the structural integrity of adjacent properties or existing public improvements and street rights-of-way located adjacent to the site if the recommendations of this report are incorporated into design.

5.4.2 Flood
The site is not mapped within a FEMA-designated flood zone and is designated as Flood “Zone X” (FEMA, 2006). Zone X is an “Area of 500-year flood: areas of 100-year flood with average depths of less than 1 foot or with drainage areas less than 1 square mile; and areas protected by levees from 100-year flood”.

Figure 5-3 (following page) reproduces flood mapping of the site vicinity.

5.4.3 Tsunami
Tsunami (‘tidal wave’) describes a series of fast-moving, long-period ocean waves caused by earthquakes or volcanic eruptions. The elevation and distance of the site from the ocean preclude this threat.

5.4.4 Seiche
Seiches are standing waves that develop in an enclosed or partially enclosed body of water such as lakes or reservoirs. Harbors or inlets can also develop seiches. They are most commonly caused by wind and atmospheric pressure changes. Seiches can also result from seismic events and tsunamis.

The site is not located near a body of water that could generate a seiche. 10/24/2023 PH1 633 of 2254

Second Update Report of Geotechnical Investigation
Kensho Housing Residential Apartments, Vista, CA
NOVA Project No. 2021172
April 25, 2022
34 Figure 5-3. Flood Mapping of the Site Area
10/24/2023 PH1 634 of 2254

Second Update Report of Geotechnical Investigation
Kensho Housing Residential Apartments, Vista, CA
NOVA Project No. 2021172
April 25, 2022
35 6. EARTHWORK AND FOUNDATIONS

6.1 Overview

6.1.1 Review of Site Hazards
Section 5 provides review of geologic, soils, and siting-related hazards common to this region of California, considering each for its potential to affect the planned construction. That review identifies two primary site hazards, as abstracted below.

1. Hazard 1, Strong Ground Motion. This site is at risk for moderate-to-severe ground shaking in response to either a local moderate or more distant large-magnitude earthquake. Section 6.2 provides parameters for seismic-resistant structural design.

2. Hazard 2, Undocumented Fill. The area of the planned building addition is locally underlain by undocumented fill that locally extends to depths of about 3 to 5 feet but may be thicker in unexplored areas of the site. Section 6.3 guides earthwork, including planning to mitigate the risk of undocumented fill.

3. Hazard 3, Difficult Excavation. Sound tonalite rock underlies the entire site. Locally, this rock occurs within the near subsurface, within depths planned for excavation for building pads and infrastructure. Sound rock may locally be difficult to loosen for removal, adding cost and time to the planned earthwork. Section 6.3 provides guidance for managing the near-surface occurrence of rock.

The remainder of this section provides design guidance for development of the site, including guidance for design and construction of foundations, retaining walls, roadways, and utilities.

6.1.2 Site Suitability
Based upon the indications of the field and laboratory data developed for this investigation, as well as review of previously developed subsurface information, it is the judgment of NOVA that the site is suitable for proposed development, provided the geotechnical recommendations described herein are followed.

Development as presently envisioned will not affect the structural integrity of adjacent properties or existing public improvements and street rights-of-way located adjacent to the site if the recommendations of this report are incorporated into project design; however, special care should be taken along the corner of the central portions of the six-story apartment structure, that as currently designed, is 6 feet from the neighboring property line. At this point, it has 22 feet of cut proposed to reach the garage floor level. If soil nails are proposed for shoring this excavation, the soil nails may not extend below the neighboring property without consent from the property owner.
10/24/2023 PH1 635 of 2254

Second Update Report of Geotechnical Investigation
Kensho Housing Residential Apartments, Vista, CA
NOVA Project No. 2021172
April 25, 2022
36 6.1.3 Review and Surveillance
It is intended that the recommendations provided herein be sufficient to develop the project in general accordance with the 2019 California Building Code (CBC) requirements.

NOVA should review the grading plans, foundation plans, and geotechnical-related specifications as they become available to confirm that the recommendations presented in this report have been incorporated into the plans prepared for the project. All earthwork related to site and foundation preparation should be completed under the observation of NOVA.

Section 9 design addresses review and construction surveillance in more detail.

6.2 Seismic Design Parameters

6.2.1 Site Class
The Site Class has been determined from ASCE 7, Table 20.3-1. The depth of soil information available for this site is limited. However, as is well-established by the geologic literature and by experience at numerous nearby sites, the granitic rock unit that occurs in the near subsurface extends to depths greater than 100 feet, such that the site may be classified as Site Class C per ASCE 7-16 (Table 20.3-1).

6.2.2 Seismic Design Parameters
Table 6-1 provides seismic design parameters in accordance with ASCE 7-16.

Table 6-1. Site-Specific Seismic Design Parameters, ASCE 7-16 Parameter Site Class C
Site Latitude, degrees 33.1955
Site Longitude, degrees -117.2407
Mapped Short Period Spectral Acceleration, S 0.914g
Mapped One-Second Period Spectral Acceleration, S1 0.338g Short Period Spectral Acceleration Adjusted For Site Class, SMS 1.097g One-Second Period Spectral Acceleration Adjusted For Site, SM1 Class, SM1 0.506g Design Short Period Spectral Acceleration, SDS 0.731g
Design One-Second Period Spectral Acceleration, SD1 0.338g Site Modified Peak Ground Acceleration, PGAM 0.474 g
source: ASCE 7-16 Hazard Tool,found at https://asce7hazardtool.online/ 10/24/2023 PH1 636 of 2254

Second Update Report of Geotechnical Investigation
Kensho Housing Residential Apartments, Vista, CA
NOVA Project No. 2021172
April 25, 2022
37 6.3 Corrosivity and Sulfates

6.3.1 General
Electrical resistivity, chloride content, and pH level are all indicators of the soil’s tendency to corrode ferrous metals. Levels of water-soluble sulfates are correlated with the potential for sulfate attack to concrete. These chemical tests were performed on representative samples of the near-surface soils.

The results of the testing are tabulated in Table 6-2.

Table 6-2. Abstract of Chemical Testing
Source Sample Ref pH Resistivity
(Ohm-cm)
Sulfates Chlorides
Boring Depth
(feet)ppm %ppm %
GSI TP-2 2 - 3 8.8 660 170 0.017 180 0.018
NOVA TP-10 1 - 3 8.3 730 <30 <0.003 21 0.002
NOVA TP-15 2 - 3 8.2 17000 <30 <0.003 43 0.004

6.3.2 Metals
Caltrans considers a soil to be corrosive if one or more of the following conditions exist for representative soil and/or water samples taken at the site:
x chloride concentration is 500 parts per million (ppm) or greater, x sulfate concentration is 2,000 ppm (0.2%) or greater, or x the pH is 5.5 or less.

Based on the Caltrans criteria, the on-site soils would not be considered ‘corrosive’ to buried metals. Appendix D provides records of the chemical testing that include estimates of the life expectancy of buried metal culverts of varying gauge.

In addition to the above parameters, the risk of soil corrosivity affecting buried metals is FRQVLGHUHGE\GHWHUPLQDWLRQRIHOHFWULFDOUHVLVWLYLW\
ȡ
6RLOUHVLVWLYLW\PD\EHXVHGWRH[SUHVV
the corrosivity of soil only in unsaturated soils. Corrosion of buried metal is an electrochemical process in which the amount of metal loss due to corrosion is directly proportional to the flow of DC electrical current from the metal into the soil. As the resistivity of the soil decreases, the corrosivity generally increases. A common qualitative correlation (cited in Romanoff 1989, NACE 2007) between soil resistivity and corrosivity to ferrous metals is tabulated in Table 6-3 (following page).
10/24/2023 PH1 637 of 2254

Second Update Report of Geotechnical Investigation
Kensho Housing Residential Apartments, Vista, CA
NOVA Project No. 2021172
April 25, 2022
38 Table 6-3. Soil Resistivity and Corrosion Potential
Minimum Soil
Resistivity
ȍ-cm)
Qualitative Corrosion
Potential
0 to 2,000 Severe
2,000 to 10,000 Moderate
10,000 to 30,000 Mild
Over 30,000 Not Likely
Despite the relatively benign environment for corrosivity indicated by pH and water-soluble chlorides, the resistivity testing suggests that design should consider that the soils may be corrosive to embedded ferrous metals.

Typical recommendations for mitigation of such corrosion potential in embedded ferrous metals include:
x a high-quality protective coating such as an 18-mil plastic tape, extruded polyethylene, coal tar enamel, or Portland cement mortar;
x electrical isolation from above grade ferrous metals and other dissimilar metals by means of dielectric fittings in utilities and exposed metal structures breaking grade; and, x steel and wire reinforcement within concrete having contact with the site soils should have at least 2-inches of concrete cover.

If extremely sensitive ferrous metals are expected to be placed in contact with the site soils, it may be desirable to consult a corrosion specialist regarding choosing the construction materials and/or protection design for the objects of concern.

6.3.3 Sulfate Attack
As shown in Table 6-2, the soil samples tested indicate water-soluble sulfate (SO4) content of less than 170 parts per million (‘ppm,’ less than 0.017% by weight) for the fill and weathered tonalite. With SO4 2.0 V + pozzolan 0.45 4,500
Adapted from: ACI 318-08, Building Code Requirements for Structural Concrete 10/24/2023 PH1 638 of 2254

Second Update Report of Geotechnical Investigation
Kensho Housing Residential Apartments, Vista, CA
NOVA Project No. 2021172
April 25, 2022
39 6.3.4 Limitations
Testing to determine several of the chemical parameters that indicate a potential for soils to be corrosive to construction materials is traditionally completed by the geotechnical engineer, comparing testing results with a variety of indices regarding corrosion potential.

Like most geotechnical consultants, NOVA does not practice in the field of corrosion protection, since this is not specifically a geotechnical issue. Should you require more information, a specialty corrosion consultant should be retained to address these issues.

6.3.5 Review and Surveillance
NOVA should review the grading plan, foundation plan, and geotechnical-related specifications as they become available to confirm that the recommendations presented in this report have been incorporated into the plans prepared for the project.

All earthwork related to site and foundation preparation should be completed under the observation of NOVA, the Geotechnical Engineer-of-Record (GEOR) for this work.

6.4 Earthwork

6.4.1 General
Based upon the design concept that is currently understood, NOVA expects that earthwork will include (i) grading to create the new building pads, (ii) excavations for foundations for walls and structures, and (iii) excavation/backfill for utilities.

Earthwork should be performed in accordance with Section 300 of the most recent approved edition of the “Standard Specifications for Public Works Construction” and “Regional Supplement Amendments.”

6.4.2 Site Preparation
Construction-related erosion and sedimentation must be controlled in accordance with Best Management Practices, as well as current City and State requirements. These controls should be established at the outset of site disturbance.

The site will be required to be cleared prior to construction, including removal of all vegetation and organics.

6.4.3 Excavation Characteristics, Planning and Contracting Excavation Characteristics
As previously discussed in Section 3, Section 4, and Section 5, tonalite rock shallowly underlies the entire site. There will be significant cuts (up to 28 feet) into this rock. Utility installation will also likely require excavation into this material. Seismic lines indicated the majority of the material is rippable using appropriate construction equipment in good working order by an experienced operator; however, where this rock is unweathered, 10/24/2023 PH1 639 of 2254

Second Update Report of Geotechnical Investigation
Kensho Housing Residential Apartments, Vista, CA
NOVA Project No. 2021172
April 25, 2022
40 sound rock may be difficult to mechanically loosen for removal, adding cost and time to the planned earthwork.

This subsection addresses planning for difficult excavation below the upper 5 feet of the subsurface. The discussion in this section is intended to address potential difficulties with this earthwork.
o Unit 1, Fill/Colluvium. This soil will be readily excavated by conventional equipment. However, cobbles and construction debris may be encountered within this layer.
o Unit 2, Weathered Tonalite. This interval extends to a depth of about 15 feet and is comprised of tonalite weathered to a dense to very dense silty sand soil. This unit has seismic velocities of about 3,600 fps to 5,500 fps. This interval will likely include some zones of sound rock (floaters). NOVA expects that the majority of this interval will be able to be excavated using heavy earthmoving equipment in good working order. However, floaters may be encountered that would require special handling by the contractor.
o Zone 3, Less Weathered to Sound Tonalite. Below about 15 feet depth, the site is underlain by sound, continuous rock with discontinuities (joints and fractures) that will diminish in frequency with increasing depth, making it more difficult to excavate. The compressive strength of sound, unweathered, unfractured tonalite can be similar to that of a low-grade concrete. The ability of ripping to mechanically loosen this interval will be dependent upon the frequency of fractures and joints.

The seismic velocity of this unit is 6,000 to 7,000 fps. For perspective, the seismic velocity of weathered concrete is in the range of 5,500 fps to about 8,000 fps. It is expected that the upper perhaps 15 to 20 feet of this unit will generally be rippable with a D10 Bulldozer, though localized areas of sound, unfractured rock may require special effort. Floaters may be encountered that would require special handling by the contractor.

Care should be taken in use of these data. While measurements of seismic velocity provide a semi-quantitative determination of the potential for rippability, it should be understood that numerous variables are associated with actual rippability, and these velocities are intended to serve only as an indicator. Potential contractors for this work should be screened for experience with rock of this nature in the San Diego area.

Contracting for Earthwork
The complexity of the soil profile - in particular, the dramatic differential in strength between fill/colluvium and tonalite rock - complicates planning for earthwork. It is NOVA’s experience that questions regarding ‘What is rock?’ often drive cost overruns and related post-construction litigation for earthwork in soil profiles such as occur at this site.
10/24/2023 PH1 640 of 2254

Second Update Report of Geotechnical Investigation
Kensho Housing Residential Apartments, Vista, CA
NOVA Project No. 2021172
April 25, 2022
41 As is noted above (and as is also discussed in Section 3.4), despite a well-developed base of subsurface information, pre-determination of actual rippability is difficult.

Potential contractors for this work should be screened to limit bidding to those with experience excavating rock and subsurface conditions similar to this site.

Planning for earthwork for this project should consider establishing contractual criteria and pay items for ‘rock’ prior to initiating excavation. For example, “rock” may be defined based upon the nature of the work and the excavation equipment, as are driven by subsurface conditions. An example of a performance-based specification is cited below.

1. General Excavations. Rock is any material that cannot be loosened with (i) a single tooth ripper drawn by a crawler tractor having a drawbar pull rated at not less than 56,000 pounds (for example, a Caterpillar D8, or equivalent); or, (ii) a front-end loader with a minimum bucket breakout force of 25,600 pounds (for example, a Caterpillar 977 or equivalent).

2. Trench Excavation. Rock is any material that cannot be excavated with a backhoe having a bucket curling force rated at not less than 33,000 pounds and a bucket equipped with excavation teeth (for example, a Caterpillar 225B or equivalent).

6.4.4 Select Fill
Materials
All engineered fill and backfill should be Select Fill, a mineral soil free of organics or regulated constituents, with the characteristics listed below:
o at least 40% by weight finer than ¼ inches in size;
o soils classified as GW, GM, SW, or SM after ASTM D2487; o maximum particle size of 6 inches; and,
o expansion index (EI) less than 30 (i.e., EI < 30, after ASTM D4829).

Most of the fill/colluvium that is now in place will conform to the above criteria. However, it should be noted that large cobbles and construction debris were encountered within the fill/colluvium layer that are not suitable and will require removal based on the specifications above.

Much of the weathered tonalite will meet the above criteria. However, this unit may include zones of sound, continuous rock (‘floaters’).

Oversized Material
Excavations will generate oversized material, defined as rocks or cemented clasts greater than 6 inches in largest dimension. Oversized material should be broken down to no greater than 6 inches in largest dimension for use in fill, used as landscape material, or disposed of off-site.
10/24/2023 PH1 641 of 2254

Second Update Report of Geotechnical Investigation
Kensho Housing Residential Apartments, Vista, CA
NOVA Project No. 2021172
April 25, 2022
42 Moisture Conditioning
All fill and backfill should be moisture conditioned to at least 2% above the optimum moisture content prior to densification.

Placement
Fill should be placed in loose lifts no thicker than the ability of the compaction equipment to thoroughly densify the lift. For most self-propelled construction equipment, this will limit loose lifts to on the order of 10 inches or less. Lift thickness for hand-operated equipment used in constrained spaces (e.g., walk-behind compactors used in utility trenches) will be limited to about 4 inches or less.

Compaction
Select Fill must be densified to at least 90% relative compaction after ASTM D1557. The fill must be densified using specialty compaction equipment and methods appropriate to the soil type. Vibratory compaction should be used for these dominantly sandy soils.

6.4.5 Remedial Grading
Building
The proposed buildings should not be underlain by a cut/fill transition or a transition from shallow fill to deep fill. To mitigate such transitions and reduce the potential for differential settlement, the buildings can be supported on shallow spread footings with bottom levels bearing entirely on a relatively uniform thickness of compacted fill.

Alternatively, the buildings can be supported on shallow spread footings with bottom levels bearing entirely on competent tonalite. Recommendations for both options are provided below.

1. Footings Bearing on Compacted Fill
Beneath the proposed building pads, the fill/colluvium not removed by planned cuts should be removed to contact with the weathered tonalite. Additionally, tonalite should be excavated a minimum of 2 feet below the bottom of the deepest footing. Horizontally, the excavations should extend at least 5 feet outside the planned perimeter building foundations or up to existing improvements, whichever is less. NOVA should observe the conditions exposed at the bottom of excavations to evaluate whether additional excavation is recommended. The resulting excavation should then be filled to the finished pad grade with compacted fill in conformance with Select Fill requirements in Section

6.4.4. 10/24/2023 PH1 642 of 2254

Second Update Report of Geotechnical Investigation
Kensho Housing Residential Apartments, Vista, CA
NOVA Project No. 2021172
April 25, 2022
43 2. Footings Bearing on Competent Tonalite
These footings may be supported directly on excavations in the competent tonalite. NOVA should observe conditions exposed in the bottom of the excavation to determine if additional excavation is required.

Current grading plans indicate that there are portions of the building where foundations will either be in proposed fill, or in existing fill/colluvium. In these areas, the existing fill and colluvium should be removed to competent tonalite bedrock, and a 2-sack sand/cement slurry can be placed between the competent tonalite and the proposed bottom of footing elevation.

Site Walls and Retaining Walls
Beneath proposed site walls and retaining walls not connected to buildings, the existing fill and colluvium should be excavated down to competent tonalite. Horizontally, the excavations should extend at least 2 feet outside the wall footing.

If competent tonalite is exposed, additional excavation need not be performed. NOVA should observe the conditions exposed at the bottom of excavations to evaluate whether additional excavation is recommended. Any required fill should conform to Select Fill requirements in Section 6.4.4.

Slopes
Permanent slopes should be constructed no steeper than 2:1 (horizontal:vertical).

Keyways should be constructed at the toe of fill slopes. Keys should extend at least 2 feet into competent tonalite. Faces of fill slopes should be compacted either by rolling with a sheepsfoot roller or other suitable equipment or by overfilling and cutting back to design grade. Fills should be benched into sloping ground inclined steeper than 5:1 (h:v). In our opinion, slopes constructed no steeper than 2:1 (h:v) will possess an adequate factor of safety. An engineering geologist should observe cut slopes during grading to ascertain that no unforeseen adverse geologic conditions are encountered that require revised recommendations. Slopes are susceptible to surficial slope failure and erosion. Water should not be allowed to flow over the top of slope. Additionally, slopes should be planted with vegetation that will reduce the potential for erosion.

Pavements
Beneath proposed vehicular pavement areas, to include fills for the proposed parking lot, the existing fill and colluvial soils should be excavated to competent tonalite.

Horizontally, excavations should extend at least 2 feet outside the planned pavement or up to existing improvements, whichever is less. NOVA should observe the conditions exposed in the bottom of excavations to evaluate whether additional excavation is recommended.
10/24/2023 PH1 643 of 2254

Second Update Report of Geotechnical Investigation
Kensho Housing Residential Apartments, Vista, CA
NOVA Project No. 2021172
April 25, 2022
44 Flatwork
Beneath proposed hardscape areas, the on-site soils should be excavated to a depth of at least 2 feet below planned subgrade elevation. Horizontally, excavations should extend at least 2 feet outside the planned hardscape or up to existing improvements, whichever is less. If competent formational materials are exposed, excavation need not be performed. NOVA should observe the conditions exposed in the bottom of excavations to evaluate whether additional excavation is recommended. The resulting surface should then be scarified to a depth of 6 to 8 inches, moisture conditioned to near optimum moisture content, and compacted to at least 90% relative compaction. If competent formational materials are exposed, scarification and recompaction need not be performed. The excavation should be filled with Select Fill in conformance with Section 6.4.4.

Exterior concrete slabs should be at least 4 inches thick and reinforced with at least No. 3 bars at 18 inches on center each way. Slabs should be provided with weakened plane joints. Joints should be placed in accordance with the American Concrete Institute (ACI) guidelines. The project architect should select the final joint patterns. A 1-inch maximum size aggregate mix is recommended for concrete for exterior slabs. The corrosion potential of on-site soils with respect to reinforced concrete will need to be taken into account in concrete mix design. Coarse and fine aggregate in concrete should conform to the “Greenbook” Standard Specifications for Public Works Construction.

6.4.6 Subgrade Stabilization
Excavation bottoms should be firm and unyielding prior to placing fill.

Areas of saturated or yielding subgrade may be stabilized by placement of a reinforcing geogrid (for example, Tensar® Triax® TX-5 or equivalent) on the excavation bottom, and then at least 12 inches of compacted aggregate base. Once the surface of the aggregate base is firm enough to achieve compaction, the remaining excavation may be filled to finished pad grade with suitable material.

6.4.7 Temporary Excavations
Temporary excavations 3 feet deep or less can be made vertically. Deeper temporary excavations in fill should be laid back no steeper than 1:1 (horizontal:vertical). Deeper temporary excavations in competent tonalite should be laid back no steeper than ¾:1 (h:v). The faces of temporary slopes should be inspected daily by the contractor’s Competent Person before personnel are allowed to enter the excavation. Any zones of potential instability, sloughing, or raveling should be brought to the attention of the engineer and corrective action implemented before personnel begin working in the excavation. Excavated soils should not be stockpiled behind temporary excavations within a distance equal to the depth of the excavation.

NOVA should be notified if other surcharge loads are anticipated so that lateral load criteria can be developed for the specific situation. If temporary slopes are to be maintained during the rainy 10/24/2023 PH1 644 of 2254

Second Update Report of Geotechnical Investigation
Kensho Housing Residential Apartments, Vista, CA
NOVA Project No. 2021172
April 25, 2022
45 season, berms are recommended along the tops of slopes to prevent runoff water from entering the excavation and eroding the slope faces.

Slopes steeper than those described above will require shoring. Additionally, temporary excavations that extend below a plane inclined at 1½:1 (h:v) downward from the outside bottom edge of existing structures or improvements will require shoring. Soldier piles and lagging, internally braced shoring, or trench boxes could be used. If trench boxes are used, the soil immediately adjacent to the trench box is not directly supported. Ground surface deformations immediately adjacent to the pit or trench could be greater where trench boxes are used compared to other methods of shoring.

Development of temporary slopes should be evaluated on a case by case bases, for example, temporary slopes less than 15 feet, developed in sound tonalite bedrock may be inclined as steep as ½:1. These slopes should be individually evaluated by the geotechnical engineer as planning for the construction of these walls moves forward.

6.4.8 Groundwater Seepage
Although not encountered within the subsurface explorations, seepage from perched groundwater may be encountered locally in excavations especially in landscaping and sloping areas of the site. If dewatering is necessary, the dewatering method should be evaluated and implemented by an experienced dewatering subcontractor.

6.4.9 Trenching and Backfilling for Utilities
Given the variability in hardness within the tonalite, NOVA recommends consideration be given to over excavating the proposed utilities to one foot below the deepest utility for ease of installation.

Excavation for utility trenches must be performed in conformance with OSHA regulations contained in 29 CFR Part 1926. Utility trench excavations have the potential to degrade the properties of the adjacent soils. Utility trench walls that are allowed to move laterally will reduce the bearing capacity and increase settlement of adjacent footings and overlying slabs.

Backfill for utility trenches is as important as the original subgrade preparation or engineered fill placed to support either a foundation or slab. No utility should be aligned beneath footings within a projected 2H:1V limit from the edge of the footing to the base of the utility trench.

Backfill for utility trenches must be placed to meet the project specifications for the engineered fill of this project. Unless otherwise specified, the backfill for the utility trenches should be placed in 4- to 6-inch loose lifts and compacted to a minimum of 90% relative compaction after ASTM D1557 (the ‘modified Proctor’) at soil moisture +2% of the optimum moisture content. Up to 4 inches of bedding material placed directly under the pipes or conduits placed in the utility trench can be compacted to 90% relative compaction with respect to the Modified Proctor.

Compaction testing should be performed for every 20 cubic yards of backfill placed or each lift within 30 linear feet of trench, whichever is less.
10/24/2023 PH1 645 of 2254

Second Update Report of Geotechnical Investigation
Kensho Housing Residential Apartments, Vista, CA
NOVA Project No. 2021172
April 25, 2022
46 Backfill of utility trenches should not be placed with water standing in the trench. If granular material is used for the backfill, the material should have a gradation that will filter protect the backfill material from the adjacent soils. If this gradation is not available, a geosynthetic non- woven filter fabric should be used to reduce the potential for the migration of fines into the backfill material.

6.5 Shallow Foundations

6.5.1 General
As previously mentioned, the proposed buildings can be supported on shallow spread footings with bottom levels bearing entirely on compacted fill. Alternatively, the proposed buildings can be supported on shallow spread footings with bottom levels bearing entirely on tonalite. In areas of deep fill/colluvium soils, a 2-sack sand/cement slurry can be placed between the proposed bottom of footing elevation and tonalite. Site walls and retaining walls not connected to buildings can be supported on shallow spread footings with bottom levels bearing on compacted fill or tonalite. Shade structures, covered walkways, and other pole-type structures can be supported on cast-in-drilled hole (CIDH) concrete piles.

The following subsections provide recommendations for shallow foundations. It is recommended that all footings, including any grade beams, be reinforced top and bottom. The actual reinforcement should be designed by the structural engineer.

6.5.2 Spread Footings
Footings should extend at least 24 inches below lowest adjacent finished grade. A minimum width of 24 inches is recommended for continuous footings and 36 inches for isolated or retaining wall footings. Footings proposed adjacent to the top of any slopes will need a minimum horizontal setback of 7 feet between the outer lower edge of the footing to the adjacent slope face.

An allowable bearing capacity of 2,500 psf can be used for spread footings supported on compacted fill. An allowable bearing capacity of 5,000 psf can be used for footings supported on tonalite. In areas of deep fill/colluvium soils, a 2-sack sand/cement slurry can be placed between the proposed bottom of footing elevation and competent tonalite. The allowable bearing capacity can be increased by 500 psf for each foot of depth below the minimum and 250 psf for each foot of width beyond the minimum up to a maximum of 5,000 psf on compacted fill or 7,500 psf on tonaliteVOXUU\7KHEHDULQJYDOXHFDQEHLQFUHDVHGE\ѿZKHQFRQVLGHULQJ the total of all loads, including wind or seismic forces. Footings located adjacent to or within slopes should be extended to a depth such that a minimum horizontal distance of 10 feet exists between the lower outside footing edge and the face of the slope.

6.5.3 Lateral Resistance
Resistance to lateral loads will be provided by a combination of (i) friction between the soils and foundation interface, and (ii) passive pressure acting against the vertical portion of the footings. 10/24/2023 PH1 646 of 2254

Second Update Report of Geotechnical Investigation
Kensho Housing Residential Apartments, Vista, CA
NOVA Project No. 2021172
April 25, 2022
47 Passive pressure may be calculated at 350 psf per foot of depth. An interface frictional coefficient of 0.35 may be used. No reduction is necessary when combining frictional and passive resistance.7KHSDVVLYHSUHVVXUHFDQEHLQFUHDVHGE\ѿZKHQFRQVLGHULQJWKHWRWDORI all loads, including wind or seismic forces. The upper 1 foot of soil should not be relied on for passive support unless the ground is covered with pavements or slabs.

6.5.4 Settlement
Structures supported on shallow foundations as recommended above will settle on the order of

0.5 inch or less, with about 70% of this settlement occurring during the construction period.

Angular distortion
ǻ/
due to differential settlement of adjacent, unevenly loaded footings will be less than 1 LQFKLQIHHW
LHǻ/OHVVWKDQ



6.5.5 Ground Supported Slabs
The ground level of garage structures may employ conventional on-grade (ground-supported) slabs designed using a modulus of subgrade reaction (k) of 110 pounds per cubic inch (i.e., k = 110 pci).

The actual slab thickness and reinforcement should be designed by the structural engineer.

NOVA recommends that slabs be a minimum 5 inches thick, reinforced by at least #4 bars placed at 18 inches on center each way and set within the middle third of the slabs by supporting the steel on chairs or concrete blocks ("dobies").

Minor cracking of concrete after curing due to drying and shrinkage is normal. Cracking is aggravated by a variety of factors, including high water/cement ratio, high concrete temperature at the time of placement, small nominal aggregate size, and rapid moisture loss due during curing. The use of low-slump concrete or low water/cement ratios can reduce the potential for shrinkage cracking.

To reduce the potential for excessive cracking, concrete slabs-on-grade should be provided with construction or ‘weakened plane’ joints at frequent intervals. Joints should be laid out to form approximately square panels and never exceed a length-to-width ratio of 1.5 to 1. Proper joint spacing and depth are essential to effective control of random cracking. Joints are commonly spaced at distances equal to 24 to 30 times the slab thickness. Joint spacing that is greater than 15 feet should include the use of load transfer devices (dowels or diamond plates).

Contraction/control joints should be established to a depth of at least ¼ the slab thickness, as depicted in Figure 6-1 (following page).
10/24/2023 PH1 647 of 2254

Second Update Report of Geotechnical Investigation
Kensho Housing Residential Apartments, Vista, CA
NOVA Project No. 2021172
April 25, 2022
48 Figure 6-1. Sawed Contraction Joint

6.6 Moisture Barrier Beneath Slabs

6.6.1 Capillary Break
NOVA recommends that ground-supported slabs include a capillary break. The requirements for a capillary break (‘sand layer’) be determined in accordance with ACI Publication 302 Guide for Concrete Floor and Slab Construction.

A “capillary break” may consist of a 4-inch-thick layer of compacted, well-graded sand should be placed below the floor slab. This porous fill should be clean coarse sand or sound, durable gravel with not more than 5% coarser than the 1-inch sieve or more than 10% finer than the No. 4 sieve, such as AASHTO Coarse Aggregate No. 57.

6.6.2 Vapor Barrier
Ground-supported slabs beneath moisture-sensitive equipment or enclosures should include a vapor membrane. Membranes set below floor slabs should be rugged enough to withstand construction. If a vapor barrier is desired, a minimum 15-mil polyethylene membrane should be placed over the porous fill to preclude floor dampness.

NOVA recommends that a minimum 15-mil low permeance vapor membrane be used. For example, Carlisle-CCW produces the Blackline 400® underslab, vapor and air barrier, a 15-mil low-density polyethylene (LDPE) rated at 0.012 perms after ASTM E96.

6.6.3 Limitations of This Recommendation
Recommendations for moisture barriers are traditionally included with geotechnical foundation recommendations, though these requirements are primarily the responsibility of the structural engineer or architect. If there is particular concern regarding moisture-sensitive materials or equipment to be placed above the slab-on-grade, a qualified person (for example, such as the flooring subcontractor and/or structural engineer) should be consulted to evaluate the general and specific moisture vapor transmission paths and any impact on the proposed construction.

NOVA does not practice in the field of moisture vapor transmission since this is not specifically a geotechnical issue.
10/24/2023 PH1 648 of 2254

Second Update Report of Geotechnical Investigation
Kensho Housing Residential Apartments, Vista, CA
NOVA Project No. 2021172
April 25, 2022
49 6.7 Conventional Retaining Walls

6.7.1 Shallow Foundations
Conventionally designed and reinforced concrete retaining walls should be developed on ground prepared in accordance with criteria provided in Section 6.4. Continuous shallow foundations may be designed in accordance with the criteria provided in Section 6.5. Retaining wall foundations should not be permitted to span cut and fill transitions. Foundations should bear entirely on formational soils or entirely on engineered fill.

6.7.2 Lateral Earth Pressures
General
Lateral earth pressures to walls are related to the type of backfill, drainage conditions, slope of the backfill surface, and the allowable rotation of the wall. The groundwater level will be well below wall levels.

Table 6-5 provides recommendations for lateral soil and groundwater wall loading to below-grade walls with level backfill for varying conditions of wall yield.

If footings or other surcharge loads are located a short distance outside the wall, these influences should be added to the lateral stress considered in the design of the wall.

Table 6-5. Wall Lateral Loads from Soil
Condition
Equivalent Fluid Pressure (psf/foot)
Level Backfill 2:1 Backfill
Sloping Upwards
Active 35 60
At Rest 55 75
Passive 350 350
Seismic Increment
Walls shorter than 6 feet in height need not consider seismic loads.

For walls 6 feet or taller, the seismic earth pressure can be taken as equivalent to the pressure of a fluid pressure weighing 18 pcf. This value is for level backfill and does not include a factor of safety. Appropriate factors of safety should be incorporated into the design. This pressure is in addition to the un-factored, active earth pressure.

The total equivalent fluid pressure can be modeled as a triangular pressure distribution with the resultant acting at a height of H/3 up from the base of the wall, where H is the retained height of the wall. The passive pressure and bearing capacity can be increased E\ѿLQGHWHUPLQLQJWKHVHLVPLFVWDELOLW\RIWKHZDOO
10/24/2023 PH1 649 of 2254

Second Update Report of Geotechnical Investigation
Kensho Housing Residential Apartments, Vista, CA
NOVA Project No. 2021172
April 25, 2022
50 Foundation Uplift
A soil unit weight of 125 pcf may be assumed for calculating the weight of soil over the wall footing in design of cantilevered retaining walls.

Wall Drainage
The recommended equivalent fluid pressures provided in the preceding subsection assume that constantly functioning drainage systems are installed between walls and soil backfill to prevent the uncontrolled buildup of hydrostatic pressures and lateral stresses in excess of those stated. Figure 6-2 (following page) depicts a conceptual wall design in this regard.

Design for wall drainage may include the use of pre-engineered wall drainage panels or a properly compacted granular free-draining backfill material (EI <30). The use of drainage openings through the base of the wall (weep holes) is not recommended where the seepage could be a nuisance or otherwise adversely affect the ground adjacent to the base of the wall.

Numerous alternatives are available for collection of water behind retaining walls. The intent of Figure 6-2 is to depict the concepts described in this subsection.

Figure 6-2. Conceptual Design for Wall Drainage
10/24/2023 PH1 650 of 2254

Second Update Report of Geotechnical Investigation
Kensho Housing Residential Apartments, Vista, CA
NOVA Project No. 2021172
April 25, 2022
51 6.8 MSE Walls

6.8.1 General
There is currently no planning for use of mechanically stabilized earth (MSE) walls. However, such walls may be efficient for use in development of roadways and building access in areas where the ground is steeply sloping. This subsection provides guidance for design of such walls.

6.8.2 Backfill
Backfill should be comprised of a select granular soil that meets the parameters listed below:
x at least 40% of the material is less than ¼-inch in size, x maximum particle size of 4 inches, and
x expansion index (EI) less than 30 (EI < 30, after ASTM D4829).

All fill/backfill placed as part of the MSE retaining wall system should be compacted to at least 90% relative compaction determined in accordance with ASTM D1557.

Table 6-6 provides geotechnical parameters for the design of the MSE retaining walls. NOVA expects that a variety of select granular soils will meet these parameters.

Table 6-6. Soil Strength Parameters for MSE Retaining Walls Parameter Reinforced
Zone
Retained
Zone
Foundation
Zone
Internal Friction Angle, I’34 34 34
Cohesion, psf 0 0 0
Wet Unit Weight, pcf 115 118 118

6.8.3 Limits of Backfill
Imported select materials should be utilized for the construction of the MSE retaining wall for the foundation area, areas to be reinforced, and for areas to be retained as indicated on Figure 6-3 (following page).
10/24/2023 PH1 651 of 2254

Second Update Report of Geotechnical Investigation
Kensho Housing Residential Apartments, Vista, CA
NOVA Project No. 2021172
April 25, 2022
52 Figure 6-3. Areas of Select Granular Backfill for MSE Walls As may be seen by review of Figure 6-3, select granular backfill should extend below the foundation of the planned wall a minimum of two feet below the foundation and areas to be reinforced (except where the wall is founded on sound tonalite). The retained area extends backward from the top of wall an equivalent distance to the height of the wall.

6.8.4 Design Review
The plans for the MSE retaining walls should be submitted to NOVA to verify that the design parameters included herein are incorporated and reflected on the project plans.

It should be noted that such review is not intended as participation in the wall design. That design will remain the responsibility of the specialty engineer/constructor who designs the wall.

The intent of NOVA’s review will be to verify that the wall designer has adequately utilized the design parameters provided herein.

6.9 Permanent Soil Nail Wall

6.9.1 General
As is evident by review of sections through the building that are provided on Plate 2, retained excavations could be up to 35 feet in height. Among alternatives for design to adapt to this condition may be use of a permanent soil nail wall. Such a wall could be used to both isolate the structure seismically and retain the cuts created by excavation to the garage floor slab grade. 10/24/2023 PH1 652 of 2254

Second Update Report of Geotechnical Investigation
Kensho Housing Residential Apartments, Vista, CA
NOVA Project No. 2021172
April 25, 2022
53 6.9.2 Responsibility
If employed, a soil nail wall should be designed by a qualified shoring engineer. The shoring engineer should be solely responsible for the design, utilizing the indications of subsurface conditions provided in the geotechnical reporting.

The following subsection provides geotechnical design parameters for use in development of a soil nail wall.

6.9.3 Geotechnical Design Parameters
Soil nails will be embedded in the Unit 2 weathered tonalite. As is discussed in Section 3.4 and Section 4.2, this unit increases in strength and consistency with increasing depth. Design for soil nails embedded in weathered tonalite should consider two conditions for soil nail resistance, as described below.
x the upper approximately 2 to 10 feet of this unit is locally weathered to the consistency of the very dense silty sand; and
x the tonalite below this level is less weathered, with zones of sound rock.

With the above perspective, Table 6-7 summarizes the strength parameters and expected ultimate bond stresses for this unit.

Table 6-7. Soil Nail Wall Geotechnical Design Parameters Element of the
Unit 2 Tonalite
Soil Design Parameters Expected
Ultimate Bond
Stress (psi)*
Unit Weight
(lb/ft3)
Friction Angle
(degrees)
Cohesion
(psf)
Upper 10 Feet 125 34 500 20
10 Feet – 25 Feet 130 38 2,500 40
* Expected bond stress is an estimate, assuming ‘post-grouted’ construction. The soil nail designer should make an independent evaluation in order to verify the preliminary bond stress cited in this table. It is the contractor’s sole responsibility to obtain the required pullout capacity. Bond stress capacity is affected by soil/rock condition, method of construction, and grouting techniques.
10/24/2023 PH1 653 of 2254

Second Update Report of Geotechnical Investigation
Kensho Housing Residential Apartments, Vista, CA
NOVA Project No. 2021172
April 25, 2022
54 7. PAVEMENTS

7.1 General
The structural design of pavement sections depends primarily on anticipated traffic conditions, subgrade soils, and construction materials. For the purposes of the evaluation provided in this section, NOVA has assumed a Traffic Index (TI) of 5.0 for passenger car parking, 6.0 for the driveways, and 7.0 for fire lanes. These traffic indices should be confirmed by the civil engineer prior to final design.

7.2 Drainage
Control of surface drainage is important to the design and construction of pavements. Standing water that develops either on the pavement surface or within the base course can soften the subgrade and create other problems related to the deterioration of the pavement. Good drainage should minimize the risk of the subgrade materials becoming saturated and weakened over a long period of time.

The following recommendations should be considered to limit the amount of excess moisture, which can reach the subgrade soils:
x maintain surface gradients at a minimum 2% grade away from the pavements; x compact utility trenches for landscaped areas to the same criteria as the pavement subgrade;
x seal all landscaped areas in or adjacent to pavements to minimize or prevent moisture migration to subgrade soils;
x planters should not be located next to pavements (otherwise, subdrains should be used to drain the planter to appropriate outlets);
x place compacted backfill against the exterior side of curb and gutter; and, x concrete curbs bordering landscaped areas should have a deepened edge to provide a cutoff for moisture flow beneath pavements (generally, the edge of the curb can be extended an additional 12 inches below the base of the curb).

7.3 Preventive Maintenance
Preventative maintenance should be planned and provided for in the ownership of all pavements. Preventative maintenance activities are intended to slow the rate of pavement deterioration and to preserve the pavement investment. Preventative maintenance consists of both localized maintenance (e.g. crack sealing and patching) and global maintenance (e.g. surface sealing). Preventative maintenance is usually the first priority when implementing a planned pavement maintenance program and provides the highest return on investment for pavements.
10/24/2023 PH1 654 of 2254

Second Update Report of Geotechnical Investigation
Kensho Housing Residential Apartments, Vista, CA
NOVA Project No. 2021172
April 25, 2022
55 7.4 Subgrade Preparation

7.4.1 General
Subgrades for new pavements, including areas extending to 2 feet outside the limits of new pavements, should be prepared as described below.

1.Step 1, Excavate and Stage. The upper 12 inches of soil below the base course level as well as any undocumented fill and colluvium should be removed and replaced with material that meets the requirements for Select Fill (Section 6.4.4).

2.Step 2, Scarify/Moisture Condition. The surface exposed by Step 1 and disturbed by excavation should be scarified to a depth of 6 inches, moisture conditioned to above the optimum moisture, then densified to at least 95% relative compaction after ASTM D1557.

3.Step 3, Replacement. Soils excavated by Step 1 should be replaced as Select Fill (Section 6.4.3).

4.Step 4, Proof Rolling.After the completion of compaction/densification, areas to receive pavements should be proof-rolled. A loaded dump truck or similar should be used to aid in identifying localized soft or unsuitable material. Any soft or unsuitable materials encountered during this proof-rolling should be removed, replaced with an approved backfill, and compacted.

7.4.2 Timely Pavement Construction
Construction should be managed such that preparation of the subgrade immediately precedes placement of the base course. Proper drainage of the paved areas should be provided to reduce moisture infiltration to the subgrade.

7.4.3 Surveillance
The preparation of roadway and parking area subgrades should be observed on a full-time basis by a representative of NOVA to confirm that any unsuitable materials have been removed and that the subgrade is suitable for support of the proposed driveways and parking areas after ASTM D1557.

7.5 Flexible Pavements
A laboratory-verified R-value of 44 was used for preliminary design of pavement sections. The actual R-value of the subgrade soils should be determined after grading, and the final pavement sections should be provided. Utilizing an R-value of 44, the preliminary pavement structural sections were determined for the assumed Traffic Indexes on Table 7-1 (following page). 10/24/2023 PH1 655 of 2254

Second Update Report of Geotechnical Investigation
Kensho Housing Residential Apartments, Vista, CA
NOVA Project No. 2021172
April 25, 2022
56 Table 7-1. Preliminary Recommendations for Flexible Pavements Area Subgrade R-
Value
Traffic
Index
Asphalt
Thickness (in)
Base Course
Thickness (in)
Parking Stalls 44 5.0 3.0 5.0
Auto Driveways 44 6.0 4.0 5.0
Fire Lanes 44 7.0 4.0 6.0
The above sections assume a subgrade prepared as described above. The aggregate base materials should also be placed at a minimum relative compaction of 95%. Construction materials (asphalt and aggregate base) should conform to the current Standard Specifications for Public Works Construction (Green Book).

Note that the recommended pavement sections are for planning purposes only. Additional R- value testing should be performed on actual soils at the design subgrade levels to confirm the pavement design.

7.6 Rigid Pavements
The flexible pavement specifications used in driveways and parking stalls may not be adequate for truck loading and turnaround areas. In this event, NOVA recommends that a rigid concrete pavement section be provided.

The rigid pavement section should consist of 7 inches of concrete over a 6-inch base course.

The aggregate base materials should also be placed at a minimum relative compaction of 95%.

The concrete should be obtained from a mix design that conforms with the minimum properties shown on Table 7-2.

Table 7-2. Recommendations for Concrete Pavements
Property Recommended Requirement
Compressive Strength @ 28 days 3,250 psi minimum
Strength Requirements ASTM C94
Minimum Cement Content 5.5 sacks/cu. yd.

Cement Type Type V Portland
Concrete Aggregate ASTM C33
Aggregate Size 1-inch maximum
Maximum Water Content 0.5 lb/lb of cement
Maximum Allowable Slump 4 inches
10/24/2023 PH1 656 of 2254

Second Update Report of Geotechnical Investigation
Kensho Housing Residential Apartments, Vista, CA
NOVA Project No. 2021172
April 25, 2022
57 Longitudinal and transverse joints should be provided as needed in concrete pavements for expansion/ contraction and isolation. Sawed joints should be cut within 24-hours of concrete placement and should be a minimum of 25% of slab thickness plus ¼-inch. All joints should be sealed to prevent entry of foreign material and doweled where necessary for load transfer.

Where dowels cannot be used at joints accessible to wheel loads, pavement thickness should be increased by 25% at the joints and tapered to regular thickness in 5 feet. 10/24/2023 PH1 657 of 2254

Second Update Report of Geotechnical Investigation
Kensho Housing Residential Apartments, Vista, CA
NOVA Project No. 2021172
April 25, 2022
58 8. STORMWATER INFILTRATION FEASIBILITY

8.1 Overview
Based upon the indications of the field exploration and laboratory testing reported herein, NOVA has evaluated the site as abstracted below after guidance contained in the City of Vista BMP Design Manual (hereafter, ‘the BMP Manual’).

Section 3.3 provides a description of the fieldwork undertaken to complete the testing. Figure 3- 1 depicts the location of the testing. This section provides the results of that testing and related recommendations for management of stormwater in conformance with the BMP Manual.

As is well-established in the BMP Manual, the feasibility of stormwater infiltration is principally dependent on geotechnical conditions at the project site. In consideration of geotechnical hazards associated with permanent infiltration BMPs at this site, NOVA concludes that the site is only suitable for partial stormwater infiltration in the areas of P-5 and P-6 (Plate 1). In the other areas, the rates were too low for reliable infiltration. This section provides NOVA’s assessment of the feasibility of stormwater infiltration BMPs utilizing the information developed by the field exploration described in Section 3, as well as other elements of the site assessment.

8.2 Infiltration Rate
The percolation rate of a soil profile is not the same as its infiltration rate (‘I’). Therefore, the measured/calculated field percolation rate was converted to an estimated infiltration rate utilizing the Porchet Method in accordance with guidance contained in the BMP Manual. Table 8-1 provides a summary of the infiltration rates determined by the percolation testing.

Table 8-1. Infiltration Rate Determined by Percolation Testing Boring
Reference
Approximate
Elevation
(feet, msl)
Total
Depth
(feet)
Approximate
Percolation
Test
Elevation
(feet, msl)
Subsurface
Unit
Tested1
Infiltration
Rate
(in/hr)
Infiltration
Rate
(in/hr,
FS=2)2
P-1 +354 5 +349 Qcol 0.06 0.03
P-2 +355 6 +349 Qcol 0.10 0.05
P-3 +364 6 +358 Kt 0.12 0.06
P-4 +365 5 +360 Kt 0.06 0.03
P-5 +369 6 +363 Qcol 2.99 1.49
P-6 +370 5.5 +364.5 Qcol 2.32 1.16
P-7 +362 5 +357 Kt 0.12 0.06
P-8 +362 5 +357 Kt 0.69 0.34
P-9 +371 5 +365.5 Qcol 0.16 0.08
P-10 +371 5 +365.5 Qcol 0.38 0.19
Note 1: The referenced subsurface units tested colluvium (Qcol), and Cretaceous tonalite (Kt) Note 2: ‘FS’ indicates ‘Factor of Safety’.
10/24/2023 PH1 658 of 2254

Second Update Report of Geotechnical Investigation
Kensho Housing Residential Apartments, Vista, CA
NOVA Project No. 2021172
April 25, 2022
59 As may be seen by review of Table 8-1, in consideration of the nature and variability of subsurface materials, as well as the natural tendency of infiltration structures to become less efficient with time, the calculated infiltration rates were modified using a factor of safety (F) of F=2 for preliminary design purposes.

8.3 Review of Geotechnical Feasibility Criteria

8.3.1 Overview
Section C.2 of Appendix C of the BMP Manual provides seven factors that should be considered by the project geotechnical professional while assessing the feasibility of infiltration related to geotechnical conditions. These factors are listed below. x C.2.1 Soil and Geologic Conditions
x C.2.2 Settlement and Volume Change
x C.2.3 Slope Stability
x C.2.4 Utility Considerations
x C.2.5 Groundwater Mounding
x C.2.6 Retaining Walls and Foundations
x C.2.7 Other Factors
The above geotechnical feasibility criteria are reviewed in the following subsections.

8.3.2 Soil and Geologic Conditions
The sequence of subsurface materials encountered by the borings may be generalized to occur as described below.
x Artificial Fill (Afu). The undocumented artificial fill encountered at the site is generally found in three localized zones, which are presented on Plate 1. Fill in the two eastern areas are less than 3 feet in thickness, observed to be grayish-brown silty sand with gravel of loose consistency. Some construction debris was observed within the fill. This undocumented soil is at risk for wide variations in quality and consistency. x Quaternary Colluvium (Qcol). The colluvium was encountered either below the fill or from the surface in all borings except TP-21. This unit was generally observed to be olive to reddish-brown silty sand and brown to dark brown clayey sand and sandy clay of loose/soft to medium dense in consistency/relative density. The unit was generally porous with some gravel and cobbles encountered. The colluvium is depicted on Figure x Weathered Tonalite (Kt). The upper several feet of the Cretaceous-aged weathered tonalite, decomposed to the consistency of a medium to coarse, light brown to gray silty sand. This residual soil is derived from in-place weathering of the parent tonalite. The degree of weathering diminishes with depth, such that this unit may include zones of sound, continuous rock, as well as gravelly zones.
10/24/2023 PH1 659 of 2254

Second Update Report of Geotechnical Investigation
Kensho Housing Residential Apartments, Vista, CA
NOVA Project No. 2021172
April 25, 2022
60 8.3.3 Settlement and Volume Change
The calculated infiltration rates within the fill/colluvium are relatively low and are not suitable for settlement-sensitive improvements. As such these soils will be removed/recompacted and are not representative of the reliable infiltration rate at the site.

8.3.4 Slope Stability
The site is characterized by a relatively sloping ground surface. The steepest topographic gradients range from about +360 feet mean sea level (msl) at the eastern periphery of the site to about +430 feet msl at Lado De Loma Drive, a surface gradient of about 20%. BMPs are required to be sited at least 50 feet away from slopes. This site has limited space to achieve that setback.

8.3.5 Utilities
Stormwater infiltration BMPs should not be sited within 10 feet of underground utilities.

8.3.6 Groundwater Mounding
Stormwater infiltration can result in damaging groundwater mounding during wet periods.

Though the infiltration rates in the tonalite were variable from low to high, this unit becomes dense with depth. Over time, this unit could create groundwater mounding due to its low permeability.

8.3.7 Retaining Walls and Foundations
Stormwater infiltration BMPs should not be sited within 10 feet from retaining walls and foundations.

8.3.8 Other
Other risk factors include nuisance perched groundwater resulting from water infiltration perching on the very dense tonalite.

8.4 Preliminary Recommendation for Infiltration
In consideration of the foregoing, it is the preliminary judgment of NOVA that the site is not suitable for reliable infiltration of stormwater BMPs in any of the areas tested with the exception of P-5 and P-6.

BMP facilities with no infiltration conditions should be lined throughout with an impermeable geomembrane to reduce the potential for water-related distress to adjacent structures or improvements. A subdrain system should be installed at the bottom of BMP facilities.

Additionally, BMP facilities should be kept at least 10 feet from structural foundations.

Appendix E presents Worksheet C.4-1: Categorization of Infiltration Feasibility Condition Based on Geotechnical Conditions.
10/24/2023 PH1 660 of 2254

Second Update Report of Geotechnical Investigation
Kensho Housing Residential Apartments, Vista, CA
NOVA Project No. 2021172
April 25, 2022
61 9. CONSTRUCTION REVIEW, OBSERVATION, AND TESTING

9.1 Overview
As is discussed in Section 1, the recommendations contained in this report are based upon a limited number of borings and an assumption of general continuity of subsurface conditions between borings.

The recommendations provided in both NOVA’s proposal for this work and this report assume that NOVA will be retained to provide consultation and review during the design phase, to interpret this report during the construction phase, and to provide construction monitoring in the form of testing and observation.

9.2 Design Phase Review
NOVA should be retained to provide review of final grading and foundation plans. This review is provided for in NOVA’s proposal for this work.

9.3 Construction Observation and Testing

9.3.1 Preconstruction Conference
A preconstruction conference among representatives of the owner, contractor and/or construction manager, and Geotechnical Engineer-of-Record (GEOR) is recommended to discuss the planned construction procedures and quality control requirements.

9.3.2 Special Inspections
Special inspections should be provided per Section 1705 of the California Building Code. The soils special inspector should be a representative of NOVA as the GEOR.

NOVA should be retained to provide construction-related services abstracted below. x Surveillance during site preparation, grading, and foundation excavation. x Construction of temporary shoring.

A program of quality control should be developed prior to the beginning of construction. It is the responsibility of the owner, the contractor, and/or the construction manager to determine any additional inspection items required by the architect/engineer or the governing jurisdiction.

9.3.3 Continuous Soils Special Inspection
The earthwork operations listed below should be the object of continuous soils special inspection.
x Tieback installation and testing.
x Foundation and mat subgrade preparation/compaction.
10/24/2023 PH1 661 of 2254

Second Update Report of Geotechnical Investigation
Kensho Housing Residential Apartments, Vista, CA
NOVA Project No. 2021172
April 25, 2022
62 9.3.4 Periodic Soils Special Inspection
The earthwork operations listed below should be the object of periodic soils special inspection, subject to approval by the Building Official.
x Site preparation and removal of existing development features. x Placement and compaction of utility trench backfill.

9.3.5 Testing During Inspections
The locations and frequencies of compaction test should be determined by the geotechnical engineer at the time of construction. Test locations and frequencies may be subject to modification by the geotechnical engineer based upon soil and moisture conditions encountered, the size and type of compaction equipment used by the contractor, the general trend of compaction test results, and other factors.

Of particular concern to NOVA during earthwork operations will be good practices in moisture conditioning, loose soil placement, and soil compaction. In particular, NOVA will be vigilant with regard to the use of compaction equipment appropriate to the full lift thickness of the type of soil being compacted. Reliance on construction traffic (for example, loaders or dump trucks) to achieve compaction will not be approved.
10/24/2023 PH1 662 of 2254

Second Update Report of Geotechnical Investigation
Kensho Housing Residential Apartments, Vista, CA
NOVA Project No. 2021172
April 25, 2022
63 10. REFERENCES

10.1 Site Specific
Geosoils, Inc., 2016, Geotechnical Evaluation, Proposed Kensho Housing Development, APN’s 179-093-18, 23, 30, 32, and 34, Lado De Loma Drive, Vista, CA 92083, WO 7089-A-SC, July

28. NOVA Services Inc. (NOVA), 2021, Report, Update Geotechnical Investigation, Proposed Kensho Housing Residential Apartments, Lado De Loma Drive, Vista, California, NOVA Project 2018216, September 22, 2021.

Safdie Rabines Architects,2021, Tideline Vista, December 2.

Safdie Rabines Architects,2022, Kensho Housing EDR Submittal, Guajome Street, Vista, California 92083, March 11.

Vinje & Middleton Engineering,2003.Report of Geotechnical Investigation.

10.2 Design
ACI, 2002, Building Code Requirements for Structural Concrete, ACI 318-02.

ACI, 2015, Guide to Concrete Floor and Slab Construction,ACI 302.1R-15.

ASCE, Minimum Design Load for Buildings and Other Structures, ASCE 7-10.

ASCE 7-16 Hazard Tool,found at https://asce7hazardtool.online/ .

APWA, 2015 Standard Specifications for Public Works Construction (‘Greenbook’).

California Code of Regulations, Title 24, 2019 California Building Standards Code.

California Department of Conservation, Division of Mines and Geology, 1996, DMG Open File Report, 96-02, Geologic Maps of Northwest Part of San Diego County California.

California Department of Transportation (Caltrans), 2003, Corrosion Guidelines, Version 1.0, available at http://www.dot.ca.gov/hq/esc/ttsb/corrosion/pdf/2012-11-19-Corrosion-Guidelines.pdf .

California Department of Water Resources, Water Data Library: found at http://www.water.ca.gov/waterdatalibrary/ .

City of Vista, 2016, BMP Design Manual For Permanent Site Design, Storm Water Treatment and Hydromodification Management, update June 2016.

FHWA, 1998, Manual for Design & Construction Monitoring of Soil Nail Walls, FHWA-SA-96- 096R. U.S. Department of Transportation, Federal Highway Administration, Washington, D.C.

OSHPD Seismic Design Maps,found at: https://seismicmaps.org/ . 10/24/2023 PH1 663 of 2254

Second Update Report of Geotechnical Investigation
Kensho Housing Residential Apartments, Vista, CA
NOVA Project No. 2021172
April 25, 2022
64 10.3 Site Setting
California Division of Mines and Geology (CDMG), 2008, Guidelines for Evaluating and Mitigating Seismic Hazards in California,Special Publication 117A.

Kennedy, M.P., and Tan, S.S., 2007, Geologic Map of The Oceanside 30' × 60' Quadrangle, California,California Geological Survey, Scale 1:100,000. Plate 1 of 2.

Historic Aerials Website https://www.historicaerials.com/accessed September 2020.

State Water Resources Control Board, GeoTracker website, https://geotracker.waterboards.ca.gov/accessed September 2020.

Tan, S. and Giffen, G., California Department of Conservation, Division of Mines and Geology, 1995, DMG Open File Report, 95-04, Landslide Hazards In The Northern Part Of The San Diego Metropolitan Area, San Diego County, California.
10/24/2023 PH1 664 of 2254

Second Update Report of Geotechnical Investigation
Kensho Housing Residential Apartments, Vista, CA
NOVA Project No. 2021172
April 25, 2022
PLATES
10/24/2023 PH1 665 of 2254

11"TD
13"TC
11"X2
T
C
11"TC
12"TC
12"TC
10"TC
12"T
C
15"T
D
12"TC
14"TD
D
S
S
T
C

XXXXXXX XXX XX XXX XX XXX XXXXX X

OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OE OEOE OE OE OE OE OEOE OE OE OE OE OE OEOE OE OE OEOEOEOE OE
OE

OEOE OE
OE
OE
OE
OEOE
OEOE
OEOE
OE OE
OEOE
OEOE
OE
OEOE

OE OEOE OE
OEOE
OEOE
OEOE
OEOE
OEOE
OE
OE
OE OE
OE

OEOE OEOE
OEOE
OE OE
OEOE
OE OE
OEOE
OE
OE OE
OE
OEOEOE
OEOE
OEOE
OEOE
OEOE
OEOE
OEOEOE
OE
OE
OEOE
OEOE
OEOE
OE OE
OE OE
OEOE
OEOEOE
OE

OEOE OE
OE OE
OEOE
OEOE
OEOE
OEOE
OEOE

OEOEOE OE
OE
OE
OE
OEOE
OEOE
OE OE
OE OE
OEOE
OEOE
OE

OE OEOE
OE

OE OEOEOE
OEOE
OEOE
OEOE
OEOE
OEOE
OE OE
OE
OEOE
OEOE
OEOE
OE OE
OE OE
OE OE
OEOE
OE

OE OEOE OEOE OE

OEOEOEOE
OEOE
OEOE
OEOE
OEOE

OE OEOEOEOE
OEOE
OEOE
OE OE
OE OE
OEOE
OEOE

OEOE OE
OE
OE
OEOE
OEOE
OEOE
OEOE
OEOE
OEOE
OEOE
OE OE
OE OE

OE OEOE
OEOE
OEOE
OE OE
OE OE
OEOE

OEOE OE
OE
OE

OEOEOEOE
OEOE
OEOE
OEOE
OEOE
OEOE

OE OEOEOEOE
OEOE
OEOE
OE OE
OE OE
OEOE
OEOE
OEOE

OEOE OEOE OEOEOE
OEOE
OEOE
OEOE
OEOE

OEOEOE OEOE
OEOEOE
OE

OEOEOE OE
OE OE
OEOE
OEOE
OEOE
OEOE
OE

OEOEOEOE
OEOE
OEOE
OEOE
OEOE
OEOE
OE
OE

OE OEOE OEOEOEOE
OEOE
OEOE
OEOE
OEOE
OEOE
OEOE
OE
OE
OEOEOE
OEOE
OEOE
OEOE
OEOE
OEOE

OE OEOEOEOEOEOE
OE
OE
OE OE
OE OE
OEOE
OEOE
OEOE

OEOE OEOEOEOEOE
OEOE
OEOE
OEOE
OEOE
OEOE
OE OE

OEOE OE
OE

OEOEOEOEOE
OE
OE
OE

OEOEOEOEOEOEOE
OE
OE

OEOEOEOEOEOEOE
OE
OE

OEOEOEOEOEOE
OE
OE
OE

OEOEOEOEOEOE
OE
OE

OEOEOEOEOEOEOEOE
OE

OEOEOEOEOE
OE
OE
OE
OE

OEOEOEOEOEOEOE
OE
OE

OEOEOEOEOE
OE
OE
OE

OEOEOEOEOEOE
OE
OE
OE

OEOEOEOEOE
OE
OE
OE
OE

OEOEOEOEOEOEOE
OE
OE

OEOEOEOE

OEOEOE OEOEOE OEOEOE OEOEOE OEOEOE OEOEOE OEOEOE OEOEOE OEOEOE OEOEOE OEOEOE OEOEOE OEOEOE OEOEOE OEOEOE OEOE OE OEOEOE OEOEOE OEOEOE OEOEOE OEOEOE OEOEOE OEOEOE OEOEOE OEOEOE OEOEOE OEOE OE OEOEOE OEOEOE OEOEOE OEOEOE OEOEOE OEOEOE OEOEOE OEOE

OEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOE

OEOEOEOEOE

OEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOE

OEOEOEOEOEOEOEOEOEOE

OEOEOEOEOE

OEOEOEOEOEOEOEOEOEOE

OEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOEOE OE
OE
OEOEOE
OE
OE
OE
OE

OEOEOEOE
OE
OE
OE
OEOEOE
OE
OE
OE
OE
OEOEOE
OE
OE
OE
OE
OEOEOE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OEOE
OE
OE
OE
OEOE
OE
OE
OEOEOE
OE
OEOEOE
OE
OE
OEOE
OE
OE
OEOEOE
OE
OEOEOE
OEOE
OE
OE
OE
OE
OEOEOE
OE
OE
OE
OE
OEOEOE
OE
OE
OE
OE
OEOEOE
OE
OE
OE
OE
OEOE
OE
OE
OE
OE
OE
OEOEOE
OEOE
OE
OE
OEOE
OE
OE
OEOEOE
OE
OE
OEOEOE
OE
OEOEOE
OE
OE
OEOEOE
OE
OE
OEOEOE
OE
OEOE
OE
OE
OE
OEOEOE
OE
OE
OEOE
OE
OE
OE
OEOE
OE
OE

OEOEOEOE
OE
OEOEOE
OE
OE
OEOE
OE
OE
OEOEOE
OE
OE
OEOE
OE
OE

OEOEOEOE
OE
OEOEOE
OE
OE
OEOE
OE
OE
OEOEOE
OE
OE
OEOEOE
OE
OE
OEOE
OE
OE
OE
OEOE
OE
OE
OEOEOE
OE

XXXX XXX XXX XX XXX XXXXX XXX XXXXXXXX XXX XX XXXXXX XXXXX XXX XX XXX XXX XX XXX XXX XXX XXXXX XXXXXX XX XXX XXX XXX XXXXXXXX XXXXX XXX XXX XXX XX XXX XXX XXXXX XXX XXX XXX XX XXX XXX XXXXXXXX XXX XXX XX XXX XXXXX XX

X XXXXXXXXX XXXXXXXXXXXXX XXXXXXXXXXXXX XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

X XXX XXX XXX XX XXXXXX XXXXXXXX XXXXXXXX XXXXXX XXXXXXXX XXX XX XXX XXXXX XXX XXXXXXXX XXXXX XXX XXX XXX XX XXX XXX XXXXXXXX XXX XXX XXXXX XXX XXXXX XXXXXXXXXX XXXXXXXXXXXXXXXX XXXXXX XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

X XXX XXXX XXX XXX XXXX XXX XXX XXXXXXX XXXXX XXX XX XXX XX XXX XXX XXX XXX XXX XXXXXX XXX XXXXXX XXX XXXXXX XXXXXX XXX XX XXXXXXXXXXXXX XXXXXXXXXXXX XXXX XXX XXX XXX XXX XXX XXXXXXX XXX XXXXXX XXXX XXX XXXXXXX XXX XXXX XXX XXXXXXX XXX XXXXXXX XXXXXXXXXXX XXXXXXXX XXXX XXX XXXX XXXX XXXX XXXXXXX XXXX XXXXXXXXXXX XXXX XXXXXXX XXXX XXXXXXX XXXXXXXXXXXXXXXXXX XXX XXXX XXXX XXXXXXX XXX XXXXXXXXXXX XXXX XXX XXXX XXXXXXXXXX XXXXXXXX XXXXXXXXXXXXXXXXX XXXXXXXXX XXXXXXXX XXXX XXXXX XXXXXXXX XXXXXXXXXXXXXXXXXXXX XXXXXXXXX XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX XXXX XXXXXXXXXXXXXXXXXXXXXXX XXXXXXXXXXXXXXXXXXX XXXXXXXXXXXXXX XXXXXXXXXX XXXXXX XXXXXXXXXXXXXXXXXXXXXX XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX XXXXXX XXXXXXX XXXXXXXXXXXXXXXXXXXXXXXX XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
GRAV
E
L

R
O
A
D
GRAV
E
L

R
O
A
D
AS
P
H
A
L
T

R
O
A
D
ASPH
A
L
T

R
O
A
D
EXIST
I
N
G
BUILD
I
N
G
EXIST
I
N
G
BUILD
I
N
G
EXIST
I
N
G
BUILD
I
N
G
EXIST
I
N
G
BUILD
I
N
G
EXIST
I
N
G
BUILD
I
N
G
RAILRO
A
D

T
R
A
C
K
S
RAILR
O
A
D

T
R
A
C
K
S
RAILR
O
A
D

T
R
A
C
K
S
RAILR
O
A
D

T
R
A
C
K
S
RAIL
R
O
A
D

T
R
A
C
K
S
RAIL
R
O
A
D

T
R
A
C
K
S
VEGE
T
A
T
I
O
N
(OBS
C
U
R
E
D
)
VEGE
T
A
T
I
O
N
(OBS
C
U
R
E
D
)
VEGE
T
A
T
I
O
N
(OBS
C
U
R
E
D
)
VEGE
T
A
T
I
O
N
(OBS
C
U
R
E
D
)
VEGET
A
T
I
O
N
(OBS
C
U
R
E
D
)
VEGE
T
A
T
I
O
N
(OBS
C
U
R
E
D
)
VEGET
A
T
I
O
N
(OBSC
U
R
E
D
)
VEGET
A
T
I
O
N
(OBS
C
U
R
E
D
)
VEGE
T
A
T
I
O
N
(OBS
C
U
R
E
D
)
VEGET
A
T
I
O
N
(OBSC
U
R
E
D
)
VEGET
A
T
I
O
N
(OBS
C
U
R
E
D
)
VEGE
T
A
T
I
O
N
(OBS
C
U
R
E
D
)
VEGE
T
A
T
I
O
N
(OBS
C
U
R
E
D
)
VEGE
T
A
T
I
O
N
(OBS
C
U
R
E
D
)
VEGET
A
T
I
O
N
(OBSC
U
R
E
D
)
VEGE
T
A
T
I
O
N
(OBS
C
U
R
E
D
)
DRI
V
E
W
A
Y

ASPHALT ROAD
AS
P
H
A
L
T

R
O
A
D
A
S
P
H
A
L
T

R
O
A
D
DIRT
DIRT
DIRT
DIRT
DIRT
DIRT
DIRT
DIRT
BR
O
W

D
I
T
C
H
DIRT R
O
A
D
DIRT R
O
A
D
D
I
R
T

R
O
A
D
D
I
R
T

R
O
A
D
D
I
R
T

R
O
A
D
DIR
T

R
O
A
D
DIR
T

R
O
A
D
DIR
T

R
O
A
D
DIR
T

R
O
A
D
XX
XX
XX
XXX
XX
XX
XXX
XX
XX
XXX
XX
XX
XXXXX
XXXXX
XX
XXXXX
XX
XXXXX
XX
XXX
XX
XX
XX
TRAILE
R

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX XX
XX
XX
XX
XXXXX
XX
XX
XXX
XX
XX
XX
XXX
XX
XX
X
XXX
XX
XXXXX

XX XXX XXXXXX XXXXX XXX XXX XXX XXX XXXXX XXXXXX XXXXXXXX XXX XXX XX XX XXXXX XX XX XX XX XX XX XXXXX XX XX XX XX X XXXXX XX XX XX X X
XX
XXX
XX
XXX
XX
XXX
XX
XXX
XX
XXX
XXX
XX
XXX
XX
XXX
XX
XXX
XX
XXX
XX
XXX
X

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX XXXXXX

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX XXXX

XXXXXXXXXXXXXX

XXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXX
XXXXX
XXXXXX

XXXXXXXXXX

XXXXXXXXXXX
XXXXX

XXXXXXXXXXXXXXXXXXX
XXX
XX
XXXXX
XX
XXX
XX
XXX
XXXXX
XX
XXX
XX
XXX
XX
XXX
XX
XXXXX
XXX
XX
XXXXX
XX
XXX
XX
XXX
XXXXX
XX
XXX
XX
XXX
XX
XXX
XX
XXX
XX
XXXXX
XX
XXX
XX
XXX
XX
XXXXX
XXXXX
XXXXX
XX
XXX
XX
XXXXX
XXX
XX
XX
XXX
XX
XXX
XX
XXXXX
XX
XXX
XX
XXX
XX
XXX
XX
XXXXX
XX
XXX
XX
XXX
XX
XXXXX
XXXXX
XX
XXX
XX
XXXXX
XX
XXX
XXXXX
XX
XXX
XX
XX
XXX
XX
XXX
XX
XXXXX
XXXXX
XX
XXX
XX
XXX
XX
XX
XXX
XX
XXX
XX
XXXXX
XX
XXX
XX
XXX
XX
XXX
XX

XXXXXXXX
XX
XX
XXX
XX
XX
XX
XXXXX
XX
XX
XXXXX
XX
XX
XX
XXX
XX
XX
XX
XXX
XX
XX
XX

XXXXXXX
XX
XXXXX
XX
XX
XX
XXXXX
XX
XX
XXXXX
XX
XX
XXXXX

XXX XXX XX XX XX XX XXXXX XX XX XX

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XX

XXXXXXX
XX
XX
XX
VEGET
A
T
I
O
N
(OBS
C
U
R
E
D
)
VEGET
A
T
I
O
N
(OBSC
U
R
E
D
)
VEGE
T
A
T
I
O
N
(OBS
C
U
R
E
D
)
VEGET
A
T
I
O
N
(OBS
C
U
R
E
D
)
VEGE
T
A
T
I
O
N
(OBS
C
U
R
E
D
)
BR
O
W

D
I
T
C
H
BR
O
W

D
I
T
C
H
BR
O
W

D
I
T
C
H
EXIST
I
N
G
BUILD
I
N
G
EXISTI
N
G
BUILD
I
N
G
14 "
T
P
14 "
T
P
14 "
T
P
14 "
T
D
S
S
E
T
E
W

XXXXXXXXXXXXX

XXXXXXXXXXXXXX
XXXX
XXXX

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

XXXXXXXXXX XXXXXXXXXXXXXXXXXX XXX XXX X
C
S
6'
H
I
G
H
CH
A
I
N

F
E
N
C
E
ACDR
I
V
E
ACDR
I
V
E
3 6
5 37
0 360
345
350
355
370
375
38 0
385
39 0
39 5
400
405
410
415
420
425
370
375
380
385
390
395
400
405
410
415
420
355
360
365
370
375
380
385
390
395
400
405
410
39 5
40 0
405
410
370
375
38 0
385
390
350
355
360
365
37 0
3 7
5 3
8 0
340
345
350
355
360
365
345
350
355
360
365
370
375
380
385
390
350
355
360
365
370
375
380
385
390
395
400
405
410
355
360
365
370
375
380
385
390
395
400
405
410
415
420
425
430
350
355
360
365
370
375
380
385
390
395
400
405
410
415
420
365
370
375
380
385
35 0
355
34 5
C
W
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OEOE
OE
OE

OE OE OEOEOEOEOEOEOE OE OE OE OE OE OE OE OE OE OE OE OEOEOEOEOEOEOE OE OE OE OE OE OE OE OE OE OE OE OEOEOEOEOEOEOE OE OE OE OE OE OE OE OE OE OE OEOEOEOEOEOEOEOE OE OE OE OE OE OE OE

OEOEOEOEOEOEOE OE OE OE OE OE OE OE OE OE OEOEOEOEOEOEOEOE OE OE OE OE OE OE OE OE OE OE OE OE OEOEOEOEOEOEOE OE OE OE OE OE OE OE OE OE OE OE OEOEOEOEOEOEOEOE OE DIRT D
R
I
V
E
W
A
Y
DIR
T

R
O
A
D
366.4
364.3
365.7
371.6
372.6
377.5
388.4
382.6
376.4
379.5
371.6
386.6
396.6
397.5
405.5
416.6
422.7
426.7
426.7
426.4
429.4
433.3
432.7
430.5
428.5
427.5
426.6
425.5
424.8
424.5
424.3
423.6423.2423.1
423.2
423.5
420.6
414.6
413.5
413.2
412.7
423.6
417.6
413.7
412.7
412.6
404.5
396.3
392.6
404.5
394.5
424.6
416.6
381.5
377.2
375.5
377.4
378.4
367.5
375.6
384.7
386.5
385.5
382.3
379.6
409.5
401.5
389.4
411.4
407.7
414.7
410.5
406.5
399.6
396.6
411.4
401.4
391.6
384.4
376.4
367.4
367.5
378.5
391.3
401.6
399.2
392.7
392.7
379.3
370.5
361.6
369.2
351.4
350.4
352.8
355.4
362.6
373.4
360.9
349.4
342.7
344.6
347.5
350.9
354.5
358.7
361.7
363.7
367.3
357.7
352.6
353.6349.6
347.8
353.3
366.4
362.5
361.5
363.2
373.3
362.5
380.6

SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SS
SS
SS
SS
SSS
SS
SS
SS
SSS
SS
SS
SS
S
SS
SS
SS
SS
SSS
SS
SS
SS
SS
S
SS
SS
SS
SSSSS
SS
SS
SSS
SS
SS
SS
SSSSS
SS
SS
SS
SSS
SS
SS
SS
SSS
SS
SS
SS
S
SS
SS
SS
SS
SSS
SS
SS
SS
SSSSS
SS
SS
SSSSS
SS
SS
SS
SSS
SS
SS
SS
S
SS
SS
SS
SS
SSS
SS
SS
SS
SSS
SS
SS
SS
SSSSS
SS
SS
SSS
SS
SS
SS
S
S
SS
SSSSS
SSSSS
SS
SSS
SS
SSSSS
SSSSS
SS
SSS
SS
SSS
SS
SSS
SS
SS
SSSSS
SSS
SS
SS
SSS
SS
SSSSS
SSSSS
SSSSS
SS
SSSSS
SSSSS
SS
SSSSS
SSSSS
SS
SSS
SS
SSSSS
SSSSS
SSSSS
SS
SSS
SS
SSSSS
SSSSS
SS
SSS
SS
SSS
SS
SS
SSSSS
SSSSS
SS
SSS
SS
SSSSS
SSSSS
SSSSS
SS
SSSSS
SSSSS
SS
SSS
SS
SSSSS
SSSSS
SS
SSS
SS
SSSSS
SSSSS
SSSSS
SS
SSSSS
SSSSS
SS
SSS
SS
SSS
SS
SS
SSSSS
SSSSS
SSSSS

SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS

SDSDSDSDSDSDSDSD SD SD SD SD SD SD SD SD SDSDSDSDSDSDSDSD SD SD SD SD SD SD SD SD SDSDSDSDSDSDSDSD SD W
W
WWW
W
W
WWW
W
W
WWWW
W
W
WWWW
W
W
WWWW
W
W
WWWW
W
WWWW
W
W
WWWW
W
WWWW
W
WWW
W
WWWW
WWWW
WWW
WWWW

WWWWWWWW
WWW

WWWWWWWWW
WW
WW

W WWWWWWWWWWWW WWWW WWW WWW WW WWW WW WW WW WW WW WW WW WW WW W WW WWW WWW WWW WWW W WW W WWW W WWW W WWW W W WWW W W WWW W W WWW W W W WWW W W W WWW W W WWWW W W WWWW W W WWWW W W WWWW W W WWWW W W WWWW W WWWW W W WWWW W W WWWW W W WWWW W W WWWW W W WWWW W WWWW W W WWWW W W WWWW W W WWWW W W WWWW W W WWWW W WWWW W W WWWW W W WWWW W W WWWW W W WWWW W W WWWW W W WWW W W W WWW W W WWWW W W WWWW W W WWWW W W WWW W W WW W W WWW W WWW W W WW W WWW W WW W WW W WW WWW WW W WW WW WWWWWWWW WWWW WWWWWWWWWW WWW WWWW W

WWWWWWWWW WWW
WW
WW

WWWWWWWWW
WWWWW
WWW
WWW
WWW
WWWW
WWW
WWWW
WWW
W
WWW
WWWW
WWW
W
WWW
WWWW
WWW
WWWW
WWW
W
WWW
W
WWW
WWW
W
WWW
WWWW
WWW
W
WWW
WWWW
WWW
WWWW
WWW
W
WWW
WWWW
WWWW
WWW
WWWW
WWW
WWWW
WWWW
WWW
W
WWW
WWWW
WWW
WWWW
WWWW
WWW
WWW
WWW
WWW
WWW
WWWWW
WWWWW

WWWWWWWWWWWWWWWWWW

WWWWWWWWWWWWW WWWWWWW

WWWWWWWW WWWWWWWWW WW WW WW WW WW W WW WW WW W WW WW
WWWWW
WW
WW
WWW
WW
WW
WW
WWW
WW
WW
WW
WWWWW
WW
WW
WW
WWW
WW
WW
WW
WWW
WW
WW
WW
WWW
WW
WW
WW
WWW
WW
WW
WW
WWW
WW
WW
WW
WWW
WW
WW
WW
WW
W
WW
WW
WW
WW
WWW
WW
WW
WWWWW
WW
WW
WWWWW
WW
WW
WW
WWW
WW
WW
WW
WWW
WW
WW
WW
WW
WWW
WW
WW
WWWWW
WW
WW
WWWWW
WW
WW
WWWWW
WW
WW
WW
WWW
WW
WW
WW
W
WW
W
W
WWW
W
W
WWW
W
W
WWWW
W
WWWW
W
WWW
W
WWWW
W
WWWW
W
WWW
W
WWWW
W
WWWW
W
WWW
W
WWWW
W
WWWW
W
WWWW
WWWW
W
WWWW
W
WWW
W
WWWW
W
W

WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW
WW
WW
WW
WW

WWWWWWWWWWWWWWWW
WW
WW

WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW
WW
WW
WW
WW
WW

WWWWWWWWWWWWWWWWWW
WW
WWWWWW

W WWW WW WW WW WWW WW WW WW WW W WWWW WW WW WWW WW WW W S
S
S
SSSSS

SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS
SS
SSSSS
SS
SSSSS
SS
SSSSS
SS
SSSSS
SS
SSSSS

SSSSSSS

SSSSSSS
SS
SSSSS
SS
SSSSS

SSSSSSSSSSSSSSSSSS
SSSS
SS
SSSSS
S S

SSSSSSSSSS
SSSSS

SSSSSSSS
SS S

SSSSSSSSSSSSSSS SSSSSS
SSS

SSSSS SS

S SSSSSSSSSSSSSSSSSS SSS SS SSS SSS SSSSS SSSSS SSSSSSS SSSSS SSSS SSSSS SS SSSS SSSSSSS SSSS SS SS SS SS SS SS SS SS SSS SS SS SS SS SS SS S SSSS SS SSS SS SS SSS SS SS S SS SS S SS SS S SS SSS SS S SS SSS SS SSS SSS SS S SS S SS S SS S SS S SS S SS S SS S SS S SS S SS S S SS S SS S SS S SSS S SS S SSS S SS S SSS S SSS S SS S S SS S SSS S SSS S SSS S SS S S SSS S SSSS S SS S S SSS S S SS S S S

S S S SS S S SS S S SS S S S SS S SSS S SSS S SSS S SS S S SS S SSS S SS S SS S S SS S SS S SS S SS S SS S SS S SS S SS S SS S SS SSS S SS SS S SS SS S SS SS S SS SSS SS SS SS S SS SS SS SS SSS SSSS SS SS SS SS SS SS SS SSSS SSSS SSS SSSSSSS SSSSSSS SSSSS SSS SS SSSSSS SSS SSS SSS SSS

SSSSSSS SSS
SSS
S SS

SSSSSSSSSSS
SSSSS
SSSSS

SSSSSSS

SSSSSSS
SS
SS

SSSSSSSSSSSSSSSSSSSS
SS
SS
SSSS
SSS
SS

SSSSSSS
SSSSS
SSSSS
SS
SSS
SSS
SS
SSS
SSS
SSS
SSS
SSS
SSS
SSS
SS
S
SSS
SSS
SSS
S
SS
S
SSS
S
SS
S
SSS
S
SSS
SSSS
SSS
S
SSS
S
SSS
S
SSS
S
S
SSS
S
SSS
S
SSS
S
S
SSS
S
SSS
S
S
SSSS
S
SSS
S
S
SSS
S
S
SSSS
S
SSSS
S
S
S
SSS
SSS
SSS
SSS
SS
S
SSS
SSS
SS
S
SS
SSS
S
SS
SSS
SSS
SSS
SSS
SSS
SSS
SSS
SSS
SSS
SSS
SSS
SSS
SSS
SSS
SSS
SSS
SSS
SSS
SSS
SSS
S
S

WWWWWWWWWWWWWWW

WWWWWWWWWWWWWWW
WW

WWWWWWWWWWWWW
W

WWWWWWWWWWWWWWW
W

WWWWWWWWWWWWWWW
F

WWWWWWWWWWWWW
F
LA
D
O

DE LOMA DRIVE
G
U
A
J
O
M
E

S
T
R
E
E
T
N.C.T
.

D
.

R
A
I
L
R
O
A
D

RIGH
T
-
O
F
-
W
A
Y
36 3
.
8 36
5 .
0 37
7 .
8 

























































































































































































































































































NWE
N S
NO
V
A

KENSHO HOUSING APARTMENTS

LADO DE LOMA DRIVE, VISTA, CALIFORNIAGE
O
T
E
C
H
N
I
C
A
L
MA
T
E
R
I
A
L
S
SP
E
C
I
A
L
IN
S
P
E
C
T
I
O
N









































































































































PR
O
J
E
C
T

N
O
.
:

DA
T
E
:

DR
A
W
N

B
Y
:

RE
V
I
E
W
E
D

B
Y
:
20 2
1 1
7 2
AP
R
I
L

2 0
2 2
DT
J
MS
SU
B
S
U
R
F
A
C
E
IN
V
E
S
T
I
G
A
T
I
O
N

M
A
P
DR
A
W
I
N
G

T
I
T
L
E
:

SC
A
L
E
:
1"
=
4 0
'
PL
A
T
E

N
O
.
1 O
F

2 SB
E
DV
B
E
SL
B
E
SD
V
O
S
B
*B
A
S
E

M
A
P

S
O
U
R
C
E
:

C
O
N
C
E
P
T
U
A
L

G
R
A
D
I
N
G

P
L
A
N
BY

P
L
S
A

M
A
R
C
H

4 ,

2 0
2 2
.






















































TE
S
T

P
I
T

(
N
O
V
A
)





















































TE
S
T

P
I
T

(
V
M
E
,

2 0
0 3
)















TE
S
T

P
I
T

(
G
S
I
,

2 0
1 6
)
GE
O
L
O
G
I
C

C
R
O
S
S
-
S
E
C
T
I
O
N
AL
I
G
N
M
E
N
T




SE
I
S
M
I
C

L
I
N
E























10/24/2023 PH1 666 of 2254
































































































XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX















































































































































XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX





























































































































XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX















































































































































NO
V
A
GE
O
T
E
C
H
N
I
C
A
L
MA
T
E
R
I
A
L
S
SP
E
C
I
A
L
IN
S
P
E
C
T
I
O
N









































































































































PR
O
J
E
C
T

N
O
.
:

DA
T
E
:

DR
A
W
N

B
Y
:

RE
V
I
E
W
E
D

B
Y
:
20 2
1 1
7 2
AP
R
I
L

2 0
2 2
DT
J
MS
GE
O
L
O
G
I
C

C
R
O
S
S
-
S
E
C
T
I
O
N
S
AA
'
,

B
B
'
,

C
C
'
,

A
N
D

D
D
'
DR
A
W
I
N
G

T
I
T
L
E
:

SC
A
L
E
:
1"
=
4 0
'
PL
A
T
E

N
O
.

SB
E
DV
B
E
SL
B
E
SD
V
O
S
B





























TE
S
T

P
I
T

(
N
O
V
A
)






















































TE
S
T

P
I
T

(
G
S
I
,

2 0
1 6
)




























2 O
F

2 KENSHO HOUSING APARTMENTS

LADO DE LOMA DRIVE, VISTA, CALIFORNIA
*B
A
S
E

M
A
P

S
O
U
R
C
E
:

C
O
N
C
E
P
T
U
A
L

G
R
A
D
I
N
G

P
L
A
N
BY

P
L
S
A

M
A
R
C
H

4 ,

2 0
2 2
.
10/24/2023 PH1 667 of 2254

Second Update Report of Geotechnical Investigation
Kensho Housing Residential Apartments, Vista, CA
NOVA Project No. 2021172
April 25, 2022

APPENDIX A

USE OF THE GEOTECHNICAL REPORT
10/24/2023 PH1 668 of 2254

10/24/2023 PH1 669 of 2254

10/24/2023 PH1 670 of 2254

Second Update Report of Geotechnical Investigation
Kensho Housing Residential Apartments, Vista, CA
NOVA Project No. 2021172
April 25, 2022

APPENDIX B

LOGS OF TEST PITS AND

PERCOLATION BORINGS
10/24/2023 PH1 671 of 2254

SUBSURFACE EXPLORATION LEGEND








NOVA

GEOTECHNICAL

MATERIALS

SPECIAL INSPECTION

SBEDVBE SDVOSB








MAJOR DIVISIONS TYPICAL NAMES
GRAVEL

MORE THAN HALF

COARSE FRACTION

IS LARGER THAN
NO. 4 SIEVE GRAVEL WITH
15% OR MORE
FINES

CLEAN GRAVEL

WITH LESS THAN
15% FINES

CLEAN SAND
SAND

MORE THAN HALF

COARSE FRACTION
IS FINER THAN NO.
4 SIEVE SIZE
SAND WITH 15%

OR MORE FINES

WITH LESS THAN
15% FINES

SILTS AND CLAYS
LIQUID LIMIT 50% OR LESS

SILTS AND CLAYS
LIQUID LIMIT GREATER THAN 50%

HIGHLY ORGANIC SOILS
GW
GP
GM
GC
SW
SP
SM
SC
ML
CL
OL
MH
CH
OH
PT

WELL-GRADED GRAVEL WITH OR WITHOUT
SAND

POORLY GRADED GRAVEL WITH OR

WITHOUT SAND

SILTY GRAVEL WITH OR WITHOUT SAND

CLAYEY GRAVEL WITH OR WITHOUT SAND

WELL-GRADED SAND WITH OR WITHOUT
GRAVEL

POORLY GRADED SAND WITH OR WITHOUT
GRAVEL

SILTY SAND WITH OR WITHOUT GRAVEL

CLAYEY SAND WITH OR WITHOUT GRAVEL

SILT WITH OR WITHOUT SAND OR
GRAVEL

ELASTIC SILT WITH OR WITHOUT SAND OR
GRAVEL

FAT CLAY WITH OR WITHOUT SAND OR
GRAVEL

ORGANIC SILT OR CLAY OF HIGH

PLASTICITY WITH OR WITHOUT SAND OR
GRAVEL

PEAT AND OTHER HIGHLY ORGANIC SOILS
FI
N
E
-
G
R
A
I
N
E
D

S
O
I
L
S
CO
A
R
S
E
-
G
R
A
I
N
E
D

S
O
I
L
S
MO
R
E

T
H
A
N

H
A
L
F

I
S

F
I
N
E
R

T
H
A
N

N
O
.

2 0
0 S
I
E
V
E
MO
R
E

T
H
A
N

H
A
L
F

I
S

C
O
A
R
S
E
R

T
H
A
N

N
O
.

2 0
0 S
I
E
V
E

RELATIVE DENSITY OF

COHESIONLESS SOILS

RELATIVE DENSITY

VERY LOOSE
LOOSE

MEDIUM DENSE
DENSE

VERY DENSE
SPT N60

BLOWS/FOOT
0 - 4
4 - 10
10 - 30
30 - 50
OVER 50

CONSISTENCY OF COHESIVE SOILS

CONSISTENCY

VERY SOFT
SOFT

MEDIUM STIFF
STIFF

VERY STIFF
HARD
SPT N60

BLOWS/FOOT
0 - 2
2 - 4
4 - 8
8 - 15
15 - 30
OVER 30
NUMBER OF BLOWS OF 140 LB HAMMER FALLING 30 INCHES TO DRIVE A 2 INCH O.D. (1-3/8 INCH I.D.) SPLIT-BARREL SAMPLER THE LAST 12 INCHES OF AN 18-INCH DRIVE (ASTM-1586 STANDARD PENETRATION TEST).

IF THE SEATING INTERVAL (1st 6 INCH INTERVAL) IS NOT ACHEIVED, N IS REPORTED AS REF.

POCKET PENETROMETER

MEASUREMENT (TSF)
0 - 0.25

0.25 - 0.50

0.50 - 1.0

1.0 - 2.0

2.0 - 4.0
OVER 4.0

DIRECT SHEAR

EXPANSION INDEX

ATTERBERG LIMITS

SIEVE ANALYSIS

RESISTANCE VALUE

CONSOLIDATION

SAND EQUIVALENT

CORROSIVITY

MAXIMUM DENSITYMD
DS
EI
AL
SA
RV
CN
SE

CR

LEAN CLAY WITH OR WITHOUT SAND OR
GRAVEL

ORGANIC SILT OR CLAY OF LOW TO

MEDIUM PLASTICITY WITH OR WITHOUT

SAND OR GRAVEL

SLBE
10/24/2023 PH1 672 of 2254

PROPOSED PHEASANT HILL RESIDENTIAL APARTMENTS

LADO DE LOMA DRIVE

VISTA, CALIFORNIA
NOVA

GEOTECHNICAL

MATERIALS

SPECIAL INSPECTION








SBEDVBE SDVOSB SLBE



























































































FILL (afu):

SILTY SAND; GRAYISH BROWN, DRY, LOOSE, FINE TO COARSE GRAINED, POROUS,

SOME LARGE GRAVEL, COBBLE, CONSTRUCTION DEBRIS














COLLUVIUM (Qcol):

SILTY SAND; REDDISH BROWN, SLIGHTLY MOIST, MEDIUM DENSE, FINE TO COARSE

GRAINED, POROUS

TONALITE (Kt): (WEATHERED)
SILTY SAND; REDDISH BROWN, MOIST, DENSE, FINE TO COARSE GRAINED TEST PIT TERMINATED AT 4.5 FT DUE TO PRACTICAL REFUSAL ON VERY DENSE TONALITE. NO GROUNDWATER ENCOUNTERED. NO CAVING.

10/24/2023 PH1 673 of 2254

PROPOSED PHEASANT HILL RESIDENTIAL APARTMENTS

LADO DE LOMA DRIVE

VISTA, CALIFORNIA
NOVA

GEOTECHNICAL

MATERIALS

SPECIAL INSPECTION








SBEDVBE SDVOSB SLBE



























































































FILL (afu):

SILTY SAND; GRAYISH BROWN, DRY, LOOSE, FINE TO COARSE GRAINED, POROUS,

ABUNDANT LARGE GRAVEL, COBBLE, CONSTRUCTION DEBRIS, SOME ASPHALT 













COLLUVIUM (Qcol):

SILTY SAND; REDDISH BROWN, SLIGHTLY MOIST, MEDIUM DENSE, FINE TO COARSE

GRAINED, POROUS

TONALITE (Kt): (WEATHERED)
SILTY SAND; REDDISH BROWN, MOIST, DENSE, FINE TO COARSE GRAINED TEST PIT TERMINATED AT 5.5 FT DUE TO PRACTICAL REFUSAL ON VERY DENSE TONALITE. NO GROUNDWATER ENCOUNTERED. NO CAVING.

10/24/2023 PH1 674 of 2254

PROPOSED PHEASANT HILL RESIDENTIAL APARTMENTS

LADO DE LOMA DRIVE

VISTA, CALIFORNIA
NOVA

GEOTECHNICAL

MATERIALS

SPECIAL INSPECTION








SBEDVBE SDVOSB SLBE



























































































FILL (afu):

SILTY SAND; GRAYISH BROWN, DRY, LOOSE, FINE TO COARSE GRAINED, POROUS,

ABUNDANT LARGE GRAVEL, CONSTRUCTION DEBRIS














COLLUVIUM (Qcol):

SILTY SAND; REDDISH BROWN, SLIGHTLY MOIST, MEDIUM DENSE, FINE TO COARSE

GRAINED, POROUS

TEST PIT TERMINATED AT 5 FT DUE TO PRACTICAL REFUSAL ON VERY DENSE TONALITE. NO GROUNDWATER ENCOUNTERED. NO CAVING.

TONALITE (Kt): (WEATHERED)
SILTY SAND; REDDISH BROWN, MOIST, DENSE, FINE TO COARSE GRAINED 10/24/2023 PH1 675 of 2254

PROPOSED PHEASANT HILL RESIDENTIAL APARTMENTS

LADO DE LOMA DRIVE

VISTA, CALIFORNIA
NOVA

GEOTECHNICAL

MATERIALS

SPECIAL INSPECTION








SBEDVBE SDVOSB SLBE



























































































FILL (afu):

SILTY SAND; GRAYISH BROWN, DRY, LOOSE, FINE TO COARSE GRAINED, POROUS,

ABUNDANT LARGE GRAVEL, SOME ASPHALT DEBRIS














COLLUVIUM (Qcol):

SILTY SAND; REDDISH BROWN, SLIGHTLY MOIST, MEDIUM DENSE, FINE TO COARSE

GRAINED, POROUS

TEST PIT TERMINATED AT 5 FT DUE TO PRACTICAL REFUSAL ON VERY DENSE TONALITE. NO GROUNDWATER ENCOUNTERED. NO CAVING.

TONALITE (Kt): (WEATHERED)
SILTY SAND; REDDISH BROWN, MOIST, DENSE, FINE TO COARSE GRAINED 10/24/2023 PH1 676 of 2254

37 1
'
37 4
'
37 4
'
38 0
'
NE
SW
SW
NE

MATCHLINE

MATCHLINE
af
u
Qc
o
l
Kt
(
w
)
Kt
(
w
)
Kt
TO
T
A
L

D
E
P
T
H
:

3 '
BA
C
K
F
I
L
L
E
D
:

Y
CO
M
P
A
C
T
E
D
:

L
I
G
H
T
PR
O
J
E
C
T

N
A
M
E
:

PR
O
J
E
C
T

N
O
.
:

EQ
U
I
P
M
E
N
T
:

LO
G
G
E
D

B
Y
:

DA
T
E
:

TE
S
T

P
I
T

N
O
.
:

GR
A
P
H
I
C
A
L

R
E
P
R
E
S
E
N
T
A
T
I
O
N

B
E
L
O
W
:

SO
I
L

D
E
S
C
R
I
P
T
I
O
N
:

US
C
S
LA
B
EL
E
V
A
T
I
O
N
:

TR
E
N
D
:

NO
V
A
GE
O
T
E
C
H
N
I
C
A
L
MA
T
E
R
I
A
L
S
SP
E
C
I
A
L
IN
S
P
E
C
T
I
O
N
SB
E
DV
B
E
SL
B
E
SD
V
O
S
B
SU
R
F
A
C
E

S
L
O
P
E
:

GR
O
U
N
D
W
A
T
E
R
:

SC
A
L
E
:

AP
P
R
O
V
E
D

B
Y
:

Ph
e
a
s
a
n
t

H
i
l
l

S
i
t
e

D
e
v
e
l
o
p
m
e
n
t
20 2
1 1
7 2
30 3
.
5 C
R
08 -
1 0
-
2 0
2 1
GN
MS
TP
-
5 37
1 -
3 8
0 NE
-
S
W
-NO
1"
=
5 '
0'
-
1 '
FI
L
L

(
a
f
u
)
:

SI
L
T
Y

S
A
N
D
;

G
R
A
Y
I
S
H

B
R
O
W
N
,

D
R
Y
,
LO
O
S
E
,

F
I
N
E

T
O

C
O
A
R
S
E

G
R
A
I
N
E
D
,
PO
R
O
U
S

,

S
O
M
E

C
O
N
S
T
R
U
C
T
I
O
N
DE
B
R
I
S
,
0'
-
1 '
CO
L
L
U
V
I
U
M

(
Q
c
o
l
)
:

SI
L
T
Y

S
A
N
D
;

R
E
D
D
I
S
H

B
R
O
W
N
,

D
R
Y
,
DE
N
S
E
,

F
I
N
E

T
O

C
O
A
R
S
E

G
R
A
I
N
E
D
,
PO
R
O
U
S
1'
-
2 .
5 '
TO
N
A
L
I
T
E

(
K
t
)
:

(
W
E
A
T
H
E
R
E
D
)
SI
L
T
Y

S
A
N
D
;

O
R
A
N
G
E

B
R
O
W
N
,

D
R
Y
,
DE
N
S
E
,

M
E
D
I
U
M

T
O

C
O
A
R
S
E

G
R
A
I
N
E
D
3'
PR
A
C
T
I
C
A
L

R
E
F
U
S
A
L

@
3 F
T

O
N
TO
N
A
L
I
T
E

2. 5
'
-
3 '
TO
N
A
L
I
T
E

(
K
t
)
:

SI
L
T
Y

S
A
N
D
;

R
E
D
D
I
S
H

B
R
O
W
N
,

D
R
Y
,
VE
R
Y

D
E
N
S
E
,

M
E
D
I
U
M

T
O

C
O
A
R
S
E
GR
A
I
N
E
D
0-
1 2-
3 SMSMSMSM
10/24/2023 PH1 677 of 2254

PROPOSED PHEASANT HILL RESIDENTIAL APARTMENTS

LADO DE LOMA DRIVE

VISTA, CALIFORNIA
NOVA

GEOTECHNICAL

MATERIALS

SPECIAL INSPECTION








SBEDVBE SDVOSB SLBE



























































































COLLUVIUM (Qcol):

SILTY SAND; GRAYISH BROWN, DRY, LOOSE, FINE GRAINED














TEST PIT TERMINATED AT 2 FT DUE TO PRACTICAL REFUSAL ON VERY DENSE TONALITE. NO GROUNDWATER ENCOUNTERED. NO CAVING.

TONALITE (Kt): (WEATHERED)
SILTY SAND; OLIVE BROWN WITH REDDISH BROWN STAINING, DRY, DENSE, MEDIUM

TO COARSE GRAINED

10/24/2023 PH1 678 of 2254

PROPOSED PHEASANT HILL RESIDENTIAL APARTMENTS

LADO DE LOMA DRIVE

VISTA, CALIFORNIA
NOVA

GEOTECHNICAL

MATERIALS

SPECIAL INSPECTION








SBEDVBE SDVOSB SLBE



























































































FILL (afu):

SILTY SAND; GRAYISH BROWN, DRY, LOOSE, FINE TO MEDIUM GRAINED, SOME GRAVEL














COLLUVIUM (Qcol):

SILTY SAND; OLIVE BROWN, DRY, MEDIUM DENSE, FINE TO COARSE GRAINED, POROUS

TEST PIT TERMINATED AT 2.5 FT DUE TO PRACTICAL REFUSAL ON VERY DENSE TONALITE. NO GROUNDWATER ENCOUNTERED. NO CAVING.

TONALITE (Kt): (WEATHERED)
SILTY SAND; OLIVE BROWN, DRY, VERY DENSE, MEDIUM TO COARSE GRAINED 10/24/2023 PH1 679 of 2254

PROPOSED PHEASANT HILL RESIDENTIAL APARTMENTS

LADO DE LOMA DRIVE

VISTA, CALIFORNIA
NOVA

GEOTECHNICAL

MATERIALS

SPECIAL INSPECTION








SBEDVBE SDVOSB SLBE



























































































FILL (afu):

SILTY SAND; GRAYISH BROWN, DRY, MEDIUM DENSE, FINE TO COARSE GRAINED,

ABUNDANT LARGE GRAVEL














COLLUVIUM (Qcol):

SILTY SAND; REDDISH BROWN, DRY, MEDIUM DENSE, FINE TO COARSE GRAINED, POROUS

TEST PIT TERMINATED AT 4.5 FT DUE TO PRACTICAL REFUSAL ON VERY DENSE TONALITE. NO GROUNDWATER ENCOUNTERED. NO CAVING.

TONALITE (Kt): (WEATHERED)
SILTY SAND; OLIVE BROWN, DRY, DENSE, MEDIUM TO COARSE GRAINED

LENSE OF LARGE WHITE GRAVEL AND COBBLE
10/24/2023 PH1 680 of 2254

PROPOSED PHEASANT HILL RESIDENTIAL APARTMENTS

LADO DE LOMA DRIVE

VISTA, CALIFORNIA
NOVA

GEOTECHNICAL

MATERIALS

SPECIAL INSPECTION








SBEDVBE SDVOSB SLBE



























































































FILL (afu):

SILTY SAND; GRAYISH BROWN, DRY, MEDIUM DENSE, FINE TO COARSE GRAINED,

ABUNDANT GRAVEL














COLLUVIUM (Qcol):

SILTY SAND; REDDISH BROWN, DRY, MEDIUM DENSE, FINE TO COARSE GRAINED, POROUS

TEST PIT TERMINATED AT 4 FT DUE TO PRACTICAL REFUSAL. NO GROUNDWATER ENCOUNTERED. NO CAVING.

CLAYEY SAND; REDDISH BROWN, MOIST, DENSE, POROUS

LENSE OF LARGE WHITE GRAVEL AND COBBLE

10/24/2023 PH1 681 of 2254

PROPOSED PHEASANT HILL RESIDENTIAL APARTMENTS

LADO DE LOMA DRIVE

VISTA, CALIFORNIA
NOVA

GEOTECHNICAL

MATERIALS

SPECIAL INSPECTION








SBEDVBE SDVOSB SLBE



























































































COLLUVIUM (Qcol):

SILTY SAND; GRAYISH BROWN, DRY, LOOSE, FINE TO COARSE GRAINED, POROUS 













TEST PIT TERMINATED AT 6 FT DUE TO PRACTICAL REFUSAL ON VERY DENSE TONALITE. NO GROUNDWATER ENCOUNTERED. NO CAVING.

TONALITE (Kt): (WEATHERED)

SILTY SAND, DARK REDDISH BROWN, MOIST, MEDIUM DENSE, FINE TO COARSE

GRAINED

SANDY CLAY; DARK BROWN, MOIST, SOFT, ABUNDANT LARGE GRAVEL, SLIGHTLY POROUS
SILTY SAND; REDDISH BROWN, DRY TO SLIGHTLY MOIST, MEDIUM DENSE, FINE TO MEDIUM GRAINED, POROUS



10/24/2023 PH1 682 of 2254

PROPOSED PHEASANT HILL RESIDENTIAL APARTMENTS

LADO DE LOMA DRIVE

VISTA, CALIFORNIA
NOVA

GEOTECHNICAL

MATERIALS

SPECIAL INSPECTION








SBEDVBE SDVOSB SLBE



























































































FILL (afu):

SILTY SAND; GRAYISH BROWN, DRY, VERY DENSE, FINE TO COARSE GRAINED, ABUNDANT GRAVEL, 3" LAYER OF DECOMPOSED GRANITE














TEST PIT TERMINATED AT 6 FT DUE TO PRACTICAL REFUSAL. NO GROUNDWATER ENCOUNTERED. NO CAVING.

COLLUVIUM (Qcol):

CLAYEY SAND/SANDY CLAY; DARK BROWN, MOIST, LOOSE/SOFT, FINE TO COARSE

GRAINED, ABUNDANT GRAVEL, SLIGHTLY POROUS

SILTY SAND; REDDISH BROWN, MOIST, DENSE, FINE TO MEDIUM GRAINED, POROUS
10/24/2023 PH1 683 of 2254

PROPOSED PHEASANT HILL RESIDENTIAL APARTMENTS

LADO DE LOMA DRIVE

VISTA, CALIFORNIA
NOVA

GEOTECHNICAL

MATERIALS

SPECIAL INSPECTION








SBEDVBE SDVOSB SLBE



























































































FILL (afu):

SILTY SAND; GRAYISH BROWN, DRY, VERY DENSE , FINE TO COARSE GRAINED, ABUNDANT GRAVEL, 3 INCH LAYER OF CLASS II BASE














COLLUVIUM (Qcol):

CLAYEY SAND/SANDY CLAY; DARK BROWN, MOIST, LOOSE/SOFT, FINE TO COURSE

GRAINED, SLIGHTLY POROUS

TEST PIT TERMINATED AT 8 FT DUE TO PRACTICAL REFUSAL ON VERY DENSE TONALITE. NO GROUNDWATER ENCOUNTERED. NO CAVING.

TONALITE (Kt): (WEATHERED)
SILTY SAND; OLIVE BROWN, DRY, VERY DENSE, MEDIUM TO COARSE GRAINED SILTY SAND; REDDISH BROWN, MOIST, DENSE, FINE TO MEDIUM GRAINED, SOME

GRAVEL, POROUS



10/24/2023 PH1 684 of 2254

37 7
'
NE
38 2
'
SW
af
u
af
u

MATCHLINE

MATCHLINE
Qc
o
l
Qc
o
l
Kt
(
w
)
RO
T
T
E
N

W
O
O
D
CO
N
C
R
E
T
E
GR
A
V
E
L
TO
T
A
L

D
E
P
T
H
:

6 -
7 BA
C
K
F
I
L
L
E
D
:

Y
CO
M
P
A
C
T
E
D
:

L
I
G
H
T
PR
O
J
E
C
T

N
A
M
E
:

PR
O
J
E
C
T

N
O
.
:

EQ
U
I
P
M
E
N
T
:

LO
G
G
E
D

B
Y
:

DA
T
E
:

TE
S
T

P
I
T

N
O
.
:

GR
A
P
H
I
C
A
L

R
E
P
R
E
S
E
N
T
A
T
I
O
N

B
E
L
O
W
:

SO
I
L

D
E
S
C
R
I
P
T
I
O
N
:

US
C
S
LA
B
EL
E
V
A
T
I
O
N
:

TR
E
N
D
:

NO
V
A
GE
O
T
E
C
H
N
I
C
A
L
MA
T
E
R
I
A
L
S
SP
E
C
I
A
L
IN
S
P
E
C
T
I
O
N
SB
E
DV
B
E
SL
B
E
SD
V
O
S
B
SU
R
F
A
C
E

S
L
O
P
E
:

GR
O
U
N
D
W
A
T
E
R
:

SC
A
L
E
:

SM
AP
P
R
O
V
E
D

B
Y
:
0-
3 Ph
e
a
s
a
n
t

H
i
l
l

S
i
t
e

D
e
v
e
l
o
p
m
e
n
t
20 2
1 1
7 2
30 3
.
5 C
R
08 -
1 0
-
2 0
2 1
GN
-
TP
-
1 3
37 7
-
3 8
2 NE
-
S
W
-NO
1"
=
5 '
0'
-
3 '
FI
L
L

(
a
f
u
)
:

SI
L
T
Y

S
A
N
D
;

G
R
A
Y
I
S
H

B
R
O
W
N
,

D
R
Y
,
LO
O
S
E

T
O

M
E
D
I
U
M

D
E
N
S
E
,

F
I
N
E

T
O
CO
A
R
S
E

G
R
A
I
N
E
D
,

S
C
A
T
T
E
R
E
D
CO
N
C
R
E
T
E

D
E
B
R
I
S
,

R
O
T
T
E
N

W
O
O
D
3'
-
4 '
CO
L
L
U
V
I
U
M

(
Q
c
o
l
)
:

CL
A
Y
E
Y

S
A
N
D
/
S
A
N
D
Y

C
L
A
Y
;

D
A
R
K
BR
O
W
N
,

M
O
I
S
T
,

L
O
S
E
/
S
O
F
T
,

F
I
N
E

T
O
CO
A
R
S
E

G
R
A
I
N
E
D
,

S
L
I
G
H
T
L
Y

P
O
R
O
U
S
6'
PR
A
C
T
I
C
A
L

R
E
F
U
S
A
L

@
6 F
T

O
N
TO
N
A
L
I
T
E
SC
/
C
L
3-
4 SM
4'
-
6 '
SI
L
T
Y

S
A
N
D
;

R
E
D
D
I
S
H

B
R
O
W
N
,

M
O
I
S
T
,
DE
N
S
E
,

F
I
N
E

T
O

M
E
D
I
U
M

G
R
A
I
N
E
D
,
0'
-
2 '
FI
L
L

(
a
f
u
)
:

SI
L
T
Y

S
A
N
D
;

G
R
A
Y
I
S
H

B
R
O
W
N
,

D
R
Y
,
LO
O
S
E

T
O

M
E
D
I
U
M

D
E
N
S
E
,

F
I
N
E

T
O
CO
A
R
S
E

G
R
A
I
N
E
D
,

S
C
A
T
T
E
R
E
D
CO
N
C
R
E
T
E

D
E
B
R
I
S
,

R
O
T
T
E
N

W
O
O
D
2'
-
4 '
FR
E
Q
U
E
N
T

G
R
A
V
E
L
7'
PR
A
C
T
I
C
A
L

R
E
F
U
S
A
L
@7
F
T

O
N

T
O
N
A
L
I
T
E
4'
-
6 '
CO
L
L
U
V
I
U
M

(
Q
c
o
l
)
:

SI
L
T
Y

S
A
N
D
;

R
E
D
D
I
S
H

B
R
O
W
N
,

M
O
I
S
T
,
DE
N
S
E
,

F
I
N
E

T
O

M
E
D
I
U
M

G
R
A
I
N
E
D
6'
-
7 '
TO
N
A
L
I
T
E

(
K
t
)

(
W
E
A
T
H
E
R
E
D
)
:

SI
L
T
Y

S
A
N
D
;

L
I
G
H
T
BR
O
W
N
,

D
R
Y
,

V
E
R
Y
DE
N
S
E
,

M
E
D
I
U
M

T
O
CO
A
R
S
E

G
R
A
I
N
E
D

SM SM SM
10/24/2023 PH1 685 of 2254

PROPOSED PHEASANT HILL RESIDENTIAL APARTMENTS

LADO DE LOMA DRIVE

VISTA, CALIFORNIA
NOVA

GEOTECHNICAL

MATERIALS

SPECIAL INSPECTION








SBEDVBE SDVOSB SLBE



























































































COLLUVIUM (Qcol):

SILTY SAND; GRAYISH BROWN, DRY, LOOSE TO MEDIUM DENSE, FINE TO COURSE

GRAINED, SCATTERED CALICHE, POROUS














TEST PIT TERMINATED AT 3 FT DUE TO PRACTICAL REFUSAL ON VERY DENSE TONALITE. NO GROUNDWATER ENCOUNTERED. NO CAVING.

TONALITE (Kt): (WEATHERED)
SILTY SAND; GRAYISH BROWN, DRY TO SLIGHTLY MOIST, DENSE, FINE TO COURSE

GRAINED

TONALITE (Kt):

SILTY SAND; ORANGE BROWN, DRY TO SLIGHTLY MOIST, VERY DENSE, FINE TO

COARSE GRAINED

10/24/2023 PH1 686 of 2254

PROPOSED PHEASANT HILL RESIDENTIAL APARTMENTS

LADO DE LOMA DRIVE

VISTA, CALIFORNIA
NOVA

GEOTECHNICAL

MATERIALS

SPECIAL INSPECTION








SBEDVBE SDVOSB SLBE



























































































COLLUVIUM (Qcol):

SILTY SAND; GRAYISH BROWN, DRY, LOOSE TO MEDIUM DENSE, FINE TO COARSE

GRAINED, POROUS














TEST PIT TERMINATED AT 3 FT DUE TO PRACTICAL REFUSAL ON VERY DENSE TONALITE. NO GROUNDWATER ENCOUNTERED. NO CAVING.

TONALITE (Kt): (WEATHERED)
SILTY SAND; GRAYISH BROWN, MOIST, DENSE, MEDIUM TO COARSE GRAINED 10/24/2023 PH1 687 of 2254

PROPOSED PHEASANT HILL RESIDENTIAL APARTMENTS

LADO DE LOMA DRIVE

VISTA, CALIFORNIA
NOVA

GEOTECHNICAL

MATERIALS

SPECIAL INSPECTION








SBEDVBE SDVOSB SLBE



























































































COLLUVIUM (Qcol):

SILTY SAND; GRAYISH BROWN, DRY, LOOSE TO MEDIUM DENSE, FINE TO MEDIUM

GRAINED, POROUS














TEST PIT TERMINATED AT 2 FT DUE TO PRACTICAL REFUSAL ON VERY DENSE TONALITE. NO GROUNDWATER ENCOUNTERED. NO CAVING.

BROWN, MOIST
10/24/2023 PH1 688 of 2254

PROPOSED PHEASANT HILL RESIDENTIAL APARTMENTS

LADO DE LOMA DRIVE

VISTA, CALIFORNIA
NOVA

GEOTECHNICAL

MATERIALS

SPECIAL INSPECTION








SBEDVBE SDVOSB SLBE



























































































COLLUVIUM (Qcol):

SILTY SAND; GRAYISH BROWN, DRY, MEDIUM DENSE TO DENSE, FINE TO MEDIUM

GRAINED, POROUS














TEST PIT TERMINATED AT 4 FT DUE TO PRACTICAL REFUSAL ON VERY DENSE TONALITE. NO GROUNDWATER ENCOUNTERED. NO CAVING.

TONALITE (Kt): (WEATHERED)
SILTY SAND; OLIVE BROWN, MOIST, DENSE, FINE TO COARSE GRAINED 10/24/2023 PH1 689 of 2254

PROPOSED PHEASANT HILL RESIDENTIAL APARTMENTS

LADO DE LOMA DRIVE

VISTA, CALIFORNIA
NOVA

GEOTECHNICAL

MATERIALS

SPECIAL INSPECTION








SBEDVBE SDVOSB SLBE



























































































FILL (afu):

SILTY SAND; DARK BROWN, MOIST, LOOSE TO MEDIUM DENSE, FINE TO MEDIUM

GRAINED














COLLUVIUM (Qcol):

SILTY SAND; BROWN, MOIST, MEDIUM DENSE, FINE TO MEDIUM GRAINED 
TEST PIT TERMINATED AT 6 FT DUE TO PRACTICAL REFUSAL ON VERY DENSE TONALITE. NO GROUNDWATER ENCOUNTERED. NO CAVING.

TONALITE (Kt):

SILTY SAND; ORANGE BROWN, MOIST, VERY DENSE, FINE TO COARSE GRAINED CLAYEY SAND; LIGHT BROWN, MOIST, MEDIUM DENSE, FINE TO MEDIUM GRAINED,

SCATTERED ROOTLETS





10 VERY LOW
10/24/2023 PH1 690 of 2254

PROPOSED PHEASANT HILL RESIDENTIAL APARTMENTS

LADO DE LOMA DRIVE

VISTA, CALIFORNIA
NOVA

GEOTECHNICAL

MATERIALS

SPECIAL INSPECTION








SBEDVBE SDVOSB SLBE



























































































FILL (afu):

SILTY SAND; DARK BROWN, MOIST, LOOSE TO MEDIUM DENSE, FINE TO MEDIUM

GRAINED, ABUNDANT ROOTS














COLLUVIUM (Qcol):

SILTY SAND; LIGHT BROWN, MOIST, MEDIUM DENSE, FINE TO MEDIUM GRAINED,

SCATTERED COARSE GRAINS

TEST PIT TERMINATED AT 6 FT DUE TO PRACTICAL REFUSAL ON VERY DENSE TONALITE. NO GROUNDWATER ENCOUNTERED. NO CAVING.

TONALITE (Kt):

SILTY SAND; ORANGE BROWN, MOIST, VERY DENSE, FINE TO COARSE GRAINED 


10/24/2023 PH1 691 of 2254

PROPOSED PHEASANT HILL RESIDENTIAL APARTMENTS

LADO DE LOMA DRIVE

VISTA, CALIFORNIA
NOVA

GEOTECHNICAL

MATERIALS

SPECIAL INSPECTION








SBEDVBE SDVOSB SLBE



























































































COLLUVIUM (Qcol):

SILTY SAND; DARK RED BROWN, MOIST, LOOSE, FINE TO MEDIUM GRAINED 













TEST PIT TERMINATED AT 4 FT DUE TO PRACTICAL REFUSAL ON VERY DENSE TONALITE. NO GROUNDWATER ENCOUNTERED. NO CAVING.

TONALITE (Kt):

SILTY SAND; YELLOW BROWN, MOIST, VERY DENSE, FINE TO COARSE GRAINED TONALITE (Kt): (WEATHERED)
SILTY SAND; YELLOW BROWN, MOIST, VERY DENSE, FINE TO COARSE GRAINED 10/24/2023 PH1 692 of 2254

PROPOSED PHEASANT HILL RESIDENTIAL APARTMENTS

LADO DE LOMA DRIVE

VISTA, CALIFORNIA
NOVA

GEOTECHNICAL

MATERIALS

SPECIAL INSPECTION








SBEDVBE SDVOSB SLBE



























































































TONALITE (Kt): (WEATHERED)
SILTY SAND; ORANGE BROWN, MOIST, DENSE, FINE TO COARSE GRAINED, TRACE ROOTS














TEST PIT TERMINATED AT 3 FT DUE TO PRACTICAL REFUSAL ON VERY DENSE TONALITE. NO GROUNDWATER ENCOUNTERED. NO CAVING.

TONALITE (Kt):

SILTY SAND; ORANGE BROWN, MOIST, VERY DENSE, FINE TO COARSE GRAINED 
10/24/2023 PH1 693 of 2254

PROPOSED PHEASANT HILL RESIDENTIAL APARTMENTS

LADO DE LOMA DRIVE

VISTA, CALIFORNIA
NOVA

GEOTECHNICAL

MATERIALS

SPECIAL INSPECTION








SBEDVBE SDVOSB SLBE



























































































FILL (afu):

SILTY SAND; DARK BROWN, MOIST, MEDIUM DENSE, FINE TO MEDIUM GRAINED,

ABUNDANT REFUSE AND DEBRIS (CONCRETE, BRICK, PIPE, TRASH BAG) 













TEST PIT TERMINATED AT 8 FT DUE TO PRACTICAL REFUSAL ON VERY DENSE TONALITE. NO GROUNDWATER ENCOUNTERED. NO CAVING.

DARK RED BROWN


10/24/2023 PH1 694 of 2254

PROPOSED PHEASANT HILL RESIDENTIAL APARTMENTS

LADO DE LOMA DRIVE

VISTA, CALIFORNIA
NOVA

GEOTECHNICAL

MATERIALS

SPECIAL INSPECTION








SBEDVBE SDVOSB SLBE



























































































COLLUVIUM (Qcol):

SILTY SAND; DARK RED BROWN, MOIST, LOOSE, FINE TO MEDIUM GRAINED, SOME ROOTS














TEST PIT TERMINATED AT 4 FT DUE TO PRACTICAL REFUSAL ON VERY DENSE TONALITE. NO GROUNDWATER ENCOUNTERED. NO CAVING.

VERY DENSE
TONALITE (Kt): (WEATHERED)
SILTY SAND; ORANGE BROWN, MOIST, DENSE, FINE TO COARSE GRAINED 
10/24/2023 PH1 695 of 2254

PROPOSED PHEASANT HILL RESIDENTIAL APARTMENTS

LADO DE LOMA DRIVE

VISTA, CALIFORNIA
NOVA

GEOTECHNICAL

MATERIALS

SPECIAL INSPECTION








SBEDVBE SDVOSB SLBE



























































































COLLUVIUM (Qcol):

SILTY SAND; LIGHT BROWN, MOIST, LOOSE TO MEDIUM DENSE, FINE TO MEDIUM

GRAINED














TEST PIT TERMINATED AT 4 FT DUE TO PRACTICAL REFUSAL ON VERY DENSE TONALITE. NO GROUNDWATER ENCOUNTERED. NO CAVING.

TONALITE (Kt):

SILTY SAND; YELLOW BROWN, MOIST, VERY DENSE, FINE TO COARSE GRAINED TONALITE (Kt): (WEATHERED)
SILTY SAND; YELLOW BROWN, MOIST, DENSE, FINE TO COARSE GRAINED 10/24/2023 PH1 696 of 2254

PROPOSED PHEASANT HILL RESIDENTIAL APARTMENTS

LADO DE LOMA DRIVE

VISTA, CALIFORNIA
NOVA

GEOTECHNICAL

MATERIALS

SPECIAL INSPECTION








SBEDVBE SDVOSB SLBE



























































































COLLUVIUM (Qcol):

SILTY SAND; DARK BROWN, MOIST, MEDIUM DENSE, FINE TO COARSE GRAINED, 













TEST PIT TERMINATED AT 4 FT DUE TO PRACTICAL REFUSAL ON VERY DENSE TONALITE. NO GROUNDWATER ENCOUNTERED. NO CAVING.

VERY DENSE
TONALITE (Kt): (WEATHERED)
SILTY SAND; ORANGE BROWN, MOIST, DENSE, FINE TO COARSE GRAINED 10/24/2023 PH1 697 of 2254









































































































NOVA

GEOTECHNICAL

MATERIALS

SPECIAL INSPECTION








SBEDVBE SDVOSB











 

PROPOSED PHEASANT HILL RESIDENTIAL APARTMENTS

LADO DE LOMA DRIVE

VISTA, CALIFORNIA
 

 

10/24/2023 PH1 698 of 2254









































































































NOVA

GEOTECHNICAL

MATERIALS

SPECIAL INSPECTION








SBEDVBE SDVOSB











 

PROPOSED PHEASANT HILL RESIDENTIAL APARTMENTS

LADO DE LOMA DRIVE

VISTA, CALIFORNIA

 
 

10/24/2023 PH1 699 of 2254









































































































NOVA

GEOTECHNICAL

MATERIALS

SPECIAL INSPECTION








SBEDVBE SDVOSB












PROPOSED PHEASANT HILL RESIDENTIAL APARTMENTS

LADO DE LOMA DRIVE

VISTA, CALIFORNIA
 
  

10/24/2023 PH1 700 of 2254









































































































NOVA

GEOTECHNICAL

MATERIALS

SPECIAL INSPECTION








SBEDVBE SDVOSB











 

← All documents from this meeting