WEST SACRAMENTO CITY COUNCIL AND WEST SACRAMENTO REDEVELOPMENT SUCCESSOR
AGENCY & WEST SACRAMENTO FINANCING AUTHORITY
City Council Regular Meeting
FEBRUARY 19, 2025 AGENDA
Martha Guerrero, Mayor
Verna Sulpizio Hull, Mayor Pro Tem
Quirina Orozco, Council Member
Norma Alcala, Council Member
Dawnté Early, Council Member
Aaron Laurel, City Manager
Jeffrey Mitchell, City Attorney
6:00 PM Closed Session Call to Order
7:00 PM Regular Meeting Call to Order
Pledge of Allegiance
Land Acknowledgment
The meeting will be held at City Hall, City Council Chambers, 1110 West Capitol Avenue, West Sacramento GENERAL ADMINISTRATION FUNCTION – PART I
1. PRESENTATIONS BY THE PUBLIC ON MATTERS NOT ON THE AGENDA WITHIN THE
JURISDICTION OF THE COUNCIL
The Council is prohibited from discussing issues not on the agenda brought to them at this time.
According to State Law (the Brown Act), items must first be noticed on the agenda before any discussion or action.
PRESENTATIONS
2. City Manager's Office
PRESENTATION OF PROCLAMATION RECOGNIZING FEBRUARY 2025 AS BLACK HISTORY MONTH
Objective: The purpose of this report is to celebrate African American’s contributions to our society during the month of February and recognize their courageous efforts to ensure equity and peace for all people.
Recommendation: Staff respectfully recommends that the City Council adopt a proclamation recognizing February 2025 as Black History Month.
3. Economic Development & Housing
PRESENTATION ON YOLO COUNTY HOUSING'S 5-YEAR STRATEGIC PLANNING PROCESS Anyone wishing to address the Council, or any agenda item, may fill out the Request to Speak card and present it to the City Clerk prior to the completion of staff presentation. Items on the Consent Agenda will be considered in one motion and the Request to Speak card should be turned in prior to the first item on Consent.
1 Objective: The objective of this item is for the City Council to receive an update on Yolo County Housing's 5-Year Strategic Planning Process and provide feedback.
Recommendation: Staff respectfully recommends that the City Council receive a presentation on Yolo County Housing’s 5-Year Strategic Planning Process and provide feedback to Yolo County Housing staff.
CONSENT AGENDA
4. Capital Projects
CONSIDERATION OF ADOPTION OF RESOLUTION 25-6 AMENDING THE CAPITAL IMPROVEMENT PROGRAM BUDGET; APPROVAL OF THE PROJECT PLANS AND SPECIFICATIONS; AND AWARD OF A CONSTRUCTION CONTRACT TO ABIDE BUILDERS, INC. FOR THE WESTACRE PARK RENOVATION AND EXPANSION PROJECT (CIP 62155) Objective: The purpose of this report is to provide the City Council with sufficient information to adopt Resolution 25-6, amending the Capital Improvement Program (CIP), approve the project plans and specifications, and award a construction contract to the lowest responsive, responsible bidder, Abide Builders, Inc., for the Westacre Park Renovation and Expansion Project (CIP 62155).
Recommendation: Staff respectfully recommends that the City Council: 1) Find that approval of a construction contract with Abide Builders, Inc. is exempt from the California Environmental Quality Act (CEQA) pursuant to Categorical Exemptions under California Code of Regulations, Title 14, Divisions 6, Chapter 3 (CEQA Guidelines), Sections 15301, 15303, and 15304, and find that the determination represents the independent judgement of the City; 2) Adopt Resolution 25-6 amending the Capital Improvement Program budget (Attachment 1); 3) Award a contract for construction services to the lowest responsive, responsible bidder, Abide Builders, Inc. in the amount not to exceed $5,988,279.50 for the Westacre Park Renovation and Expansion Project (Attachment 2); 4) Authorize the City Manager, or his designee, to execute a construction contract with Abide Builders, Inc. in the amount of $5,988,279.50; 5) Authorize the City Manager, or his designee, to make contract amendments up to 7% ($419,179.57) of the total contract value; 6) Authorize the City Manager, or his designee, to execute non-substantive changes or modifications to the contract, with approval from the City Attorney; and 7) Authorize the City Manager, or his designee, to execute amendments to extend the term of the contract, if necessary.
5. Capital Projects
CONSIDERATION OF AWARD OF CONTRACT TO MESA ENERGY SYSTEMS INC. FOR THE REMOVAL AND REPLACEMENT OF WATER HEATER TANKS FOR THE FIRE STATION 45 WATER HEATER UPGRADE PROJECT (CIP 51046)
Objective: The objective of this report is to provide the City Council with sufficient information to approve a contract award to Mesa Energy Systems Inc. for the removal and replacement of water heater tanks for the Fire Station 45 Water Heater Upgrade Project (CIP 51046).
Recommendation: Staff respectfully recommends that the City Council: (1) Find that the Fire Station 45 Water Heater Upgrade Project (CIP 51046) is exempt from CEQA review pursuant to the 2 Categorical Exemption under California Code of Regulations, Title 14, Division 6, Chapter 3 (“CEQA Guidelines”), Article 19, Section 15301 (Existing Facilities); (2) Authorize the City Manager, or his designee, to execute a contract with Mesa Energy Systems Inc. in an amount not to exceed $50,447; (3) Authorize the City Manager, or his designee, to execute non-substantive changes or modifications to the contract with Mesa Energy Systems Inc. with the approval from the City Attorney; and (4) Authorize the City Manager, or his designee, to execute contract amendments up to 30% ($15,134.10) of the value of the contract.
6. Capital Projects
CONSIDERATION OF AWARD OF A PROFESSIONAL SERVICES CONTRACT TO DISABILITY ACCESS CONSULTANTS, LLC., FOR THE DEVELOPMENT OF AN ADA SELF-EVALUATION AND TRANSITION PLAN (CIP 52082)
Objective: The objective of this report is to provide the City Council with sufficient information for the approval of a professional services contract with Disability Access Consultants, LLC., (DAC) for the development of an ADA Self-Evaluation and Transition Plan (CIP 52082).
Recommendation: Staff respectfully recommends that the City Council: 1) Award a contract for professional services with DAC to prepare, develop, and deliver an ADA Self-Evaluation and Transition Plan (CIP 52082); 2) Authorize the City Manager, or their designee, to execute a professional services contract with DAC in the amount of $424,920 for the preparation of an ADA Self-Evaluation and Transition Plan; 3) Authorize the City Manager, or his designee, to execute contract amendments up to $42,492 using contract contingency; and 4) Authorize the City Manager, or his designee, to execute non-substantive changes, modifications or amendments to extend the term of the contract, with approval from the City Attorney.
7. Capital Projects
CONSIDERATION OF ADOPTION OF RESOLUTION 25-19 AMENDING THE CAPITAL IMPROVEMENT PROGRAM AND APPROVAL OF CONTRACT AMENDMENT NO. 2 WITH PSOMAS FOR THE 6TH STREET & CUMMINS WAY TRAFFIC SAFETY PROJECT (CIP 12023) Objective: The objective of this report is to provide the City Council with sufficient information to adopt Resolution 25-19 amending the Capital Improvement Program and approve Contract Amendment No. 2 of the professional services contract with Psomas for the 6th Street & Cummins Way Traffic Safety Project (CIP 12023).
Recommendation: Staff respectfully recommends that the City Council: 1) Adopt Resolution 25-19 amending the Capital Improvement Program; 2) Approve and authorize the City Manager, or his designee, to execute Amendment No. 2 to the professional services contract with Psomas in the amount of $74,810 and extend the term of the contract to December 31, 2026, for the 6th Street & Cummins Way Traffic Safety Project; 3) Authorize the City Manager or his designee to execute amendments or change orders up to 15% of the contract amendment amount ($11,200); 4) Authorize the City Manager to execute non-substantive changes or modifications, with approval from the City Attorney; and 5) Authorize the City Manager or his designee to execute amendments to further extend the term of the contract, if necessary. 3 8. Capital Projects
CONSIDERATION OF AWARD OF A PROFESSIONAL SERVICES CONTRACT TO MATRIX
CONSULTING GROUP, LTD FOR THE DEVELOPMENT OF A FACILITIES, VEHICLES, AND EQUIPMENT MASTER PLAN (CIP 51276)
Objective: The objective of this report is to provide the City Council with sufficient information for the approval of a professional services contract with Matrix Consulting Group, Ltd (Matrix Consulting) for the preparation of a Facilities, Vehicles, and Equipment Master Plan (CIP 51276).
Recommendation: Staff respectfully recommends that the City Council: 1) Award a contract for professional services with Matrix Consulting to prepare, develop, and deliver the Facilities, Vehicles, and Equipment Master Plan (CIP 51276); 2) Authorize the City Manager, or his designee, to execute a professional services contract with Matrix Consulting in the amount of $455,330 for the preparation of a Facilities, Vehicles, and Equipment Master Plan; 3) Authorize the City Manager, or his designee, to make non-substantive changes or modifications to the Contract for Services, with approval from the City Attorney; 4) Authorize the City Manager, or his designee, to execute contract amendments up to $45,533 for contract contingency; and 5) Authorize the City Manager, or his designee, to execute non-substantive changes or modifications to the professional services contract, with approval from the City Attorney.
9. Community Development
CONSIDERATION OF SECOND READING AND ADOPTION OF ORDINANCE 25-1 REGARDING PROPOSED AMENDMENTS TO TITLE 17 (ZONING) OF THE MUNICIPAL CODE TO CREATE
THE GRAND GATEWAY ZONING DISTRICT AND RELATED ACTIONS
Objective: The objective of this report is for the City Council to adopt Ordinance 25-1 regarding proposed amendments to Title 17 (Zoning) to create the Grand Gateway Zoning District and related actions to streamline future redevelopment of the Grand Gateway area.
Recommendation: Staff respectfully recommends that the City Council: 1) Find that the Grand Gateway Zoning District is consistent with the General Plan required for Zoning Amendments; 2) Find that the project is exempt from California Environmental Quality Act (CEQA) review pursuant to §15183 (Projects Consistent with a Community Plan or Zoning) of the CEQA Guidelines; and 3) Waive the second reading and adopt Ordinance 25-1 amending Title 17 (Zoning) of the Municipal Code regarding creating the Grand Gateway Zoning District and Related Actions.
10. Economic Development & Housing
CONSIDERATION OF RESOLUTIONS 25-27 AND 25-28 DELEGATING AUTHORITY TO THE CITY MANAGER TO ACQUIRE 1841 WEST CAPITOL AVENUE (APN 067-270-043) Objective: The purpose of this report is to facilitate City Council consideration of Resolutions 25- 27 and 25-28 which appropriate funds and authorize the City Manager to acquire property (1841 West Capitol Avenue) for future City use.
Recommendation: Staff respectfully recommends that the City Council: 1) Find that the acquisition of property located at 1841 West Capitol Avenue is exempt from California Environmental Quality Act (CEQA) analysis in accordance with subdivision (b) of Section 21152 of the Public Resources 4 Code; 2) Adopt Resolution 25-27 (Attachment 1) establishing a budget appropriation of $2,575,000 from Measure G funds to cover initial acquisition costs; and 3) Adopt Resolution 25-28 (Attachment 2) delegating authority to the City Manager to take any and all actions necessary to complete the city’s acquisition of Properties.
11. Economic Development & Housing
CONSIDERATION OF RESOLUTION 25-26 DELEGATING AUTHORITY TO THE CITY
MANAGER TO TAKE ANY AND ALL ACTIONS NECESSARY TO COMPLETE A PASSTHROUGH ACQUISITION AND SALE OF PROPERTY LOCATED AT 641 5TH STREET (APN 010-464-003) Objective: The purpose of this report is to provide sufficient information for City Council consideration of Resolution 25-26 which authorizes the City Manager to take actions necessary to complete a passthrough acquisition and sale of property located at 641 5th Street for an affordable housing project in the Washington District.
Recommendation: Staff respectfully recommends that the City Council: 1) Find that acquisition of the property at 641 5th Street (“Property”) is exempt from California Environmental Quality Act (CEQA) analysis under the Class 32 (In-fill Development) Categorical Exemption, California Code of Regulations, Title 14, Division 6, Chapter 3, Article 19, Section 15332; and 2) Adopt Resolution 25- 26 delegating authority to the City Manager to take any and all actions necessary to complete a passthrough acquisition and sale of the Property.
12. Economic Development & Housing
CONSIDERATION OF APPROVAL OF CONTRACT WITH ROGER BERRY FOR THE WASHINGTON DISTRICT NEIGHBORHOOD PARK PUBLIC ART ELEMENT (CIP 62142) Objective: The purpose of this report is to provide City Council with information necessary to consider approval of a Contract to Purchase Artwork with Roger Berry for the purchase and installation of public art for the new Washington District Neighborhood Park.
Recommendation: Staff respectfully recommends that the Council: 1.) Approve a Contract to Purchase Artwork with Roger Berry for the Washington District Neighborhood Park public art element in an amount not to exceed $100,000; 2.) Authorize the City Manager, or his designee, to execute the contract in the form substantively attached; 3.) Authorize the City Manager or his designee to execute non-substantive changes and modifications to the contract, with approval from the City Attorney; and 4.) Authorize the City Manager, or his designee, to execute amendments to the contract performance schedule or for use of contingency of up to 15% ($15,000) of the value of the contract.
13. Finance
CONSIDERATION OF APPROVAL OF CONTRACT WITH CHANDLER ASSET MANAGEMENT, INC. FOR INVESTMENT MANAGEMENT SERVICES
Objective: The purpose of this report is to provide the City Council with sufficient information to consider approval of a contract for Investment Management Services with Chandler Asset Management for a three year term with options to extend for two additional one-year terms. 5 Recommendation: Staff respectfully recommends that the City Council: (1) Approve a contract with Chandler Asset Management, Inc. for Investment Management Services for a three-year term with options for two additional one-year terms; (2) Authorize the City Manager or designee to execute the contract; (3) Authorize the City Manager or his designee to execute non-substantive changes and modifications, with approval from the City Attorney; and (4) Authorize the City Manager or his designee to execute amendments to extend the term of the contract.
14. Finance
CONSIDERATION OF THE TREASURER’S QUARTERLY FINANCIAL REPORT ON THE CITY’S INVESTMENT PORTFOLIO FOR THE PERIOD ENDING SEPTEMBER 30, 2024 Objective: The purpose of this report is to provide the City Council with the treasurer’s quarterly report on the City’s investment portfolio for the quarter ending September 30, 2024 as outlined by the Government Code 53646(b) (1).
Recommendation: Staff respectfully recommends that the City Council receive and file the Treasurer’s Quarterly Financial Report on the City’s investment portfolio for the period ending September 30, 2024.
15. Finance
CONSIDERATION OF APPROVAL OF CONTRACTS FOR REVENUE AUDIT AND CONSULTING
SERVICES WITH HINDERLITER DE LLAMAS & ASSOCIATES, HDL COREN AND CONE, AND MUNISERVICES, LLC.
Objective: The objective of this report is to obtain approval from the City Council to enter into contracts with HDL Coren & Cone, Hindeliter de Llamas & Associates (HdL Companies) and MuniServices, LLC for revenue audit and consulting services for terms of three (3) years, with options to extend for an additional two years.
Recommendation: Staff respectfully recommends that the City Council: 1) Approve a contract with Hinderliter de Llamas (HdL Companies) for a three (3) year term with options to extend for two additional one-year terms; 2) Approve contract with HDL Coren and Cone for a three (3) year term with options to extend for two additional one-year terms; 3) Approve contract with Muniservices for a three (3) year term with options to extend for two additional one-year terms; 4) Authorize the City Manager or his designee to execute the contracts; 5) Authorize the City Manager or his designee to execute non-substantive changes and modifications, with approval from the City Attorney; 6) Adopt Resolution 25-25 Authorizing HDL Coren & Cone Access to city records with CDTFA; and 7) Authorize the City Manager or his designee to execute amendments to extend the term of the contract.
16. Police
CONSIDERATION OF URGENCY ORDINANCE 25-5 AMENDING CHAPTER 9.32 OF THE CITY
OF WEST SACRAMENTO MUNICIPAL CODE TO ALLOW FOR REGULATION OF ACTIVITIES
AT SUTTER HEALTH PARK
6 Objective: The objective of this report is to provide sufficient information to the City Council to adopt Ordinance 25-5 enacting Chapter 9.32 of the City of West Sacramento Municipal Code to allow for regulation of activities at Sutter Health Park. Ordinance 25-5 is an urgency measure that is needed for immediate preservation of public peace, health, and safety.
Recommendation: Staff respectfully recommends that the City Council: 1) Adopt Ordinance 25-5 (Attachment 1), amending Chapter 9 of the City of West Sacramento Municipal Code related to special events within the city limits of the City of West Sacramento; and 2) Declare that Ordinance 25-5 is an urgency measure that is needed for the immediate preservation of the public peace, health, and safety, pursuant to the authority granted to general law cities under Government Code Section 36937(b) based on the recitals and findings contained in Ordinance 25-5.
17. Police
CONSIDERATION FOR APPROVAL OF MOTOROLA RADIO EQUIPMENT LEASE AGREEMENT AND ADOPTION OF RESOLUTION 25-23 APPROVING BUDGET APPROPRIATIONS FOR THE
PURCHASE
Objective: The objective of this report is to provide the City Council with information needed to approve the purchase and financing of Motorola radio equipment for a radio communication improvement project for all City departments to meet current operational needs, growth and replace non-supported radios.
Recommendation: Staff respectfully recommends the Council: (1) Adopt resolution 25-23 authorizing a 10-year financing agreement with Motorola for the purchase of radio equipment in the amount of $ $5,497,070 and a budget allocation of $588,761 which includes $203,520 for Motorola Smart Services, $285,241 for Sutter Buttes Communications for programming and installation of equipment, as those items are not able to be financed, and $100,000 contingency budget; (2) Authorize the City Manager or designee to execute the agreement with Motorola in substantially the form shown in Attachment 3 to this report; (3) Authorize the City Manager or designee to execute an agreement with Sutter Buttes Communications (to be executed at a later date); (4) Authorize the City Manager or designee to execute change orders up to $100,000; and (5) Authorize the City Manager or designee to take any actions necessary to effectuate the proposed Municipal Lease-Purchase Agreement/Tax Exempt Financing, including without limitation, making non-substantive changes or amendments to the agreements and executing other related documents with approval from the City Attorney.
18. Public Works
CONSIDERATION OF AWARD OF A CONTRACT FOR SERVICES WITH KITCHELL CEM FOR
AN ARC FLASH STUDY AT ALL CITY LOCATIONS TO IDENTIFY RISK FACTORS IN
ELECTRICAL EQUIPMENT AT PUMP STATIONS AND CITY FACILITIES Objective: The purpose of this report is to provide the City Council with sufficient information to consider for approval a professional services contract with Kitchell to perform an Arc Flash Study to identify risk factors in electrical equipment at Pump Stations and other qualifying City locations.
Recommendation: Staff respectfully recommends that the City Council: 1) Award a contract to perform an Arc Flash Study to Kitchell CEM; 2) Authorize the City Manager or his designee to 7 execute non-substantive changes or modifications to the Contract for Services; 3) Authorize the City Manager or his designee to execute amendments or change orders up to the budgeted CIP amount; and 4) Authorize the City Manager or his designee to execute amendments to extend the term of the contract.
19. City Manager's Office
CONSIDERATION OF ADOPTION OF RESOLUTION 25-32 UPDATING ADMINISTRATIVE POLICY I-A-15: CITY COUNCIL DELEGATIONS OF AUTHORITY
Objective: The objective of this report is to provide sufficient information to the City Council to adopt resolution 25-32 updating Administrative Policy I-A-15: City Council Delegations of Authority.
Recommendation: Staff respectfully recommends that the City Council adopt Resolution 25-32 updating Administrative Policy I-A-15: City Council Delegations of Authority.
20. City Manager's Office
CONSIDERATION OF THE TERMS OF SUCCESSOR AGREEMENT AND ADOPTION OF THE
MEMORANDUM OF UNDERSTANDING BETWEEN THE CITY OF WEST SACRAMENTO AND THE WEST SACRAMENTO POLICE MANAGER’S ASSOCIATION AND ADOPTION OF RESOLUTION 25-33 APPROVING AMENDMENTS TO THE BUDGET FOR FISCAL YEAR 2024/25
Objective: The purpose of this report is to seek City Council consideration of a three-year (3) year successor Memorandum of Understanding (MOU) between the City of West Sacramento and the West Sacramento Police Manager’s Association (PMA) and Resolution 25-33, approving related budget amendments.
Recommendation: Staff respectfully recommends that the City Council: 1) Approve the terms of the successor agreement and adopt the Memorandum of Understanding between the City of West Sacramento and the West Sacramento Police Manager’s Association effective January 1, 2025, through December 31, 2027; 2) Approve the updated Classification Plan (Salary Schedule) and Benefits Summary; and 3) Adopt Resolution 25-33 approving amendments to the approved biennial budget for Fiscal Year 2024/25 to fund the proposed salary and benefit changes.
21. City Manager's Office
CONSIDERATION OF UPDATES TO PUBLICLY AVAILABLE PAY SCHEDULE AND APPROVAL
FOR VARIOUS JOB DESCRIPTIONS AND MODIFICATIONS
Objective: The purpose of this report is to seek City Council approval for various new job descriptions and modifications and updates to the publicly available pay schedule for Fiscal Year 24/25.
Recommendation: Staff respectfully recommends that the City Council: 1) Approve the new job classification description for Geographical Information Systems Supervisor; 2) Approve the new job classification description for Information Technology Operations Manager; 3) Approve the new 8 job classification description for On-Call/Special Events Police Officer; 4) Approve the modification to the job classification descriptions for Building Inspector I/II/Senior; 5) Approve the modification to the job classification description for Associate Engineer; 6) Approve the modification to the job classification description for Senior Engineer; 7) Approve the modification to the job classification description for Technical Support Specialist I/II/III; 8) Approve the modification to the job classification description for Recreation Manager; 9) Approve the modification to the job classification description for Landscape Inspector/Senior; 10) Approve the modification to the job classification description for Human Resources Analyst I/II; 11) Approve the modification to the job classification descriptions for Traffic Operations Officer/Senior; and 12) Approve the amended and updated publicly available pay schedule (Classification Plan) for Fiscal Year 2024/25.
PUBLIC HEARINGS
22. Economic Development & Housing
PUBLIC HEARING AND CONSIDERATION OF RESOLUTION 25-15 AUTHORIZING THE
APPLICATION AND ADOPTING THE PLAN FOR THE PERMANENT LOCAL HOUSING
ALLOCATION PROGRAM
Objective: The objective of this report is to provide the Council with information necessary to conduct a public hearing to receive comments and consider adopting Resolution 25-15 which authorizes the application for the Permanent Local Housing Allocation (PLHA) Program and adopts the related Five-Year Plan.
Recommendation: Staff respectfully recommends that the City Council: 1) Conduct a public hearing; 2) Find that the PLHA Program and Five-Year Plan is exempt from California Environmental Quality Act (CEQA) review pursuant to §15060(c) and 15378(a) (Not a Project) of the CEQA Guidelines; 3) Adopt Resolution 25-15 (Attachment 1) which authorizes the application for the PLHA Program and adopts the related Five-Year Plan (Attachment 2); and 4) Authorize the City Manager, or his designee, to execute and deliver the application and related documents and, if funded, execute a Standard Agreement, all amendments thereto, and any other related documents.
REGULAR AGENDA
23. City Manager's Office
CONSIDERATION OF RESOLUTION 25-24 APPROVING EXCEPTION TO THE 180-DAY
WAITING PERIOD TO HIRE A CALPERS RETIRED ANNUITANT IN ACCORDANCE WITH GOVERNMENT CODE SECTIONS 7522.56 AND 21224
Objective: The purpose of this report is to provide the City Council with sufficient information to adopt a resolution to waive the 180-day waiting period for hiring a retired annuitant.
Recommendation: Staff respectfully recommends that the City Council adopt resolution 25-24 approving an exception to the 180-day waiting period for hiring a retired annuitant as an extrahelp employee. 9 24. City Manager's Office
CONSIDERATION OF BIENNIAL APPOINTMENTS TO THE CITY BOARDS AND COMMISSIONS Objective: The objective of this report is to provide the Mayor and Members of the City Council with the information needed to appoint members to the city Boards and Commissions.
Recommendation: Staff respectfully recommends that the Mayor, with the support of the City Council, make the following appointments: (1) Arts, Culture, & Historic Preservation Commission:
7 members and 1 alternate member; (2) Board of Appeals: Continue recruitment for applicants; (3) Disaster Council: Continue recruitment for applicants: (4) Economic Development & Housing Commission: 7 members and 1 alternate member; (5) Environment & Utilities Commission: 7 members and 1 alternate member; (6) Parks, Recreation, & Intergenerational Services Commission: 7 members and 1 alternate member; (7) Planning Commission: 7 members and 1 alternate member; and (8) Transportation, Mobility, & Infrastructure Commission: 7 members and 1 alternate member.
GENERAL ADMINISTRATION FUNCTION – PART II
25. COUNCIL COMMUNICATIONS / ASSIGNMENTS
Bikeshare Policy Steering Committee --------------------------------------------Guerrero, Alternate - Early City/County 2x2 ----------------------------------------------------Guerrero/Orozco, Alternate – Sulpizio Hull City/School 2x2 ------------------------------------------------------Guerrero/Sulpizio Hull, Alternate - Alcala Executive Commission to Address Homelessness --------------------Sulpizio Hull, Alternate - Orozco EIFD Public Financing Authority-----------------------------------------------Guerrero, Alcala, Sulpizio Hull League of California Cities --------------------------------------------------- Alcala, Alternate – Sulpizio Hull Local Agency Formation Commission ---------------------------------------------------------------------- Alcala Port District Commission ---------------------------------------------------------Guerrero, Early, Sulpizio Hull Remote Access Network ------------------------------------------------------------------------------------Guerrero River City Regional Stadium Financing Authority------------------------------------------Guerrero, Orozco Sacramento Area Council of Governments (SACOG) ------------------------Early; Alternate - Guerrero Sacramento Regional County Sanitation District Board --------------Orozco; Alternate - Sulpizio Hull West Sacramento Area Flood Control Agency JPA ----------------------------Alcala; Alternate - Orozco Yolo Animal Servies Planning Agency JPA----------------------------Guerrero; Alternate – Sulpizio Hull Yolo County Housing Authority-------------------------------------------------Early, Alternate - Sulpizio Hull Yolo Transportation District -----------------------------------------------------Early, Alternate - Sulpizio Hull Yolo Habitat Conservancy ------------------------------------------------------------------------------Sulpizio Hull Yolo-Solano Air Quality Management District ----------------------------Alcala; Alternate – Sulpizio Hull Yolo Subbasin Sustainable Groundwater Agency-------------------------Sulpizio Hull; Alternate - Early
COUNCIL INTERMEDIARY REPRESENTATIVES
Delta Protection Commission -------------------------------------------------------Vacant; Alternate - Vacant New Hope Community Development Corporation---------------------------------Early; Alternate - Alcala Yolo County Consolidated Redevelopment Successor Agency Oversight Board--------Sulpizio Hull
26. PART II
A. Council Calendar
B. City Manager Report
10 C. City Attorney Report
D. Staff Direction from City Council Members
E. Future Agenda Item Requests by Council
F. Adjourn
I, Jennifer Cusmir, City Clerk, declare under penalty of perjury that the foregoing agenda for the February 19, 2025 regular and closed session meetings of the West Sacramento City Council, Redevelopment Successor Agency and Financing Authority was posted February 14, 2025 at the rear entrance at City Hall, 1110 West Capitol Avenue, West Sacramento, CA and was available for public review. __________________________________________
Jennifer Cusmir, City Clerk
NOTE: If you challenge the nature of a proposed action in court, you may be limited to raising only those issues you or someone else raised at the public hearing described in this notice, or in written correspondence delivered to the City Council at, or prior to, the public hearing.
The agenda and agenda reports are also available on the City’s website at www.cityofwestsacramento.org City Council meetings are broadcast live on Wave Cable Channel 20 and rerun the next day at 12:00 PM and the following Saturday at 6:00 PM.
All public materials related to an item on this agenda submitted to the City Council after distribution of the agenda packet are also made available for public inspection on the City’s website at:
www.cityofwestsacramento.org. Any document provided at the meeting by staff or by the public will be provided by the City Clerk upon request by phone at (916) 617-4500, or by email at: [email protected].
If you need assistance to participate in this meeting, including translation support, please contact the City Clerk’s Office at 916-617-4500 or [email protected]. Notifying the City Clerk’s Office at least 72 hours prior to the meeting will assist staff in assuring reasonable arrangements can be made to provide accessibility to the meeting. Assisted listening devices are available at this meeting.
Si necesita ayuda para participar en esta reunión o servicios de traducción, comuníquese con la Oficina del Secretario Municipal al 916-617-4500 o [email protected]. Notificar a la Oficina del Secretario Municipal al menos 72 horas antes de la reunión ayudará al personal a garantizar que se puedan hacer arreglos razonables para proporcionar accesibilidad a la reunión.
Los dispositivos de escucha asistida están disponibles en esta reunión. 11 CITY COUNCIL AGENDA REPORT
MEETING DATE: February 19, 2025 ITEM # 2
SUBJECT:
PRESENTATION OF PROCLAMATION RECOGNIZING
FEBRUARY 2025 AS BLACK HISTORY MONTH
INITIATED OR REQUESTED BY: REPORT COORDINATED OR PREPARED BY:
[ X ] Council [ ] Staff
[ ] Other
Paul Hosley, Public Information Officer
City Manager’s Office
ATTACHMENT [ X ] Yes [ ] No [ ] Information [ ] Direction [ X ] Action
OBJECTIVE
The purpose of this report is to celebrate African American’s contributions to our society during the month of February and recognize their courageous efforts to ensure equity and peace for all people.
RECOMMENDED ACTION
Staff respectfully recommends that the City Council adopt a proclamation recognizing February 2025 as Black History Month.
BACKGROUND
Black History Month has been celebrated every February since 1976, when President Gerald Ford officially recognized it as a national observance. This month holds significance as the birth month of two prominent figures in the fight for freedom: President Abraham Lincoln, born February 12, who issued the Emancipation Proclamation, and Frederick Douglass, born February 14, a leader in the abolitionist movement. The celebration of their contributions eventually led to the establishment of Black History Month, originally stemming from Negro History Week, observed during the second week of February.
ANALYSIS
The 2025 Black History Month theme, "African Americans and Labor," focuses on the various and profound ways that work and working of all kinds—free and unfree, skilled and unskilled, vocational and voluntary— intersect with the collective experiences of Black people. African Americans have played a significant role in the economic, cultural, spiritual, and political development of West Sacramento. Recognizing Black History Month not only highlights the past achievements of individuals like Lincoln and Douglass, but also emphasizes the ongoing efforts to address disparities in education, healthcare, and diversity hiring. The election of Dr.
Dawnté Early as the first African American Councilmember in 2021 underscores the city's commitment to inclusivity and representation. Adoption of this proclamation signifies the City's acknowledgment of the important role African Americans have played in our history and the City’s continuing work toward becoming an inclusive community where all citizens feel supported, recognized, and represented.
Environmental Considerations
N/A
Commission Recommendation
N/A
Strategic Plan Integration
Adoption of this proclamation underscores the City’s commitment to inclusiveness, including in the municipal workforce and management diversity.
Alternatives
N/A
Coordination and Review
N/A
Budget/Cost Impact
N/A
ATTACHMENT
Proclamation
12 PROCLAMATION
OF THE WEST SACRAMENTO CITY COUNCIL
RECOGNIZING FEBRUARY 2025 AS BLACK HISTORY MONTH
WHEREAS, February marks Black History Month, a time to honor and celebrate the extraordinary achievements and contributions of African Americans throughout history; and WHEREAS, the 2025 Black History Month theme, "African Americans and Labor," focuses on the various and profound ways that work of all kinds—free and unfree, skilled and unskilled, vocational and voluntary—intersect with the collective experiences of Black people; and
WHEREAS, we acknowledge the resilience and courage of African Americans who have confronted adversity and championed justice, paving the way for equality, peace, and progress in our society; and
WHEREAS, Black History Month traces its roots back to the establishment of Negro History Week in 1926 by Carter G. Woodson and the Association for the Study of African American Life and History, highlighting the ongoing journey of African Americans to new horizons and social realities; and
WHEREAS, this Black History Month serves as a call to action to uphold the principles of equality and justice, to affirm the value of Black lives, and to redouble our efforts to address systemic disparities in healthcare, housing, education, and criminal justice; and WHEREAS, the City of West Sacramento remains steadfast in its commitment to fostering an inclusive community where the contributions of all residents, past, present, and future, are acknowledged and celebrated; and
WHEREAS, it is with pride that the City of West Sacramento honors the rich heritage and enduring legacy of African Americans in our community.
NOW, THEREFORE, BE IT PROCLAIMED that the City Council of the City of West Sacramento hereby declares February 2025 as “Black History Month” and urges all citizens to join in commemorating our diverse heritage and culture, while reaffirming our dedication to building a more equitable, peaceful, and prosperous society for all.
PROCLAIMED this 19th day of February, 2025.
ATTEST:
Martha Guerrero, Mayor Jennifer Cusmir, City Clerk
13 CITY COUNCIL AGENDA REPORT
MEETING DATE: February 19, 2025 ITEM # 4
CONSIDERATION OF ADOPTION OF RESOLUTION 25-6 AMENDING THE CAPITAL IMPROVEMENT PROGRAM BUDGET; APPROVAL OF THE PROJECT PLANS AND SPECIFICATIONS; AND AWARD OF A CONSTRUCTION CONTRACT TO ABIDE BUILDERS, INC. FOR THE WESTACRE PARK RENOVATION AND EXPANSION PROJECT (CIP 62155)
INITIATED OR REQUESTED BY: REPORT COORDINATED OR PREPARED BY:
[ ] Council [X] Staff
[ ] Other
Megan Gideon, Project Manager I
Capital Projects Department
ATTACHMENT [X] Yes [ ] No [ ] Information [ ] Direction [X] Action
OBJECTIVE
The purpose of this report is to provide the City Council with sufficient information to adopt Resolution 25-6, amending the Capital Improvement Program (CIP), approve the project plans and specifications, and award a construction contract to the lowest responsive, responsible bidder, Abide Builders, Inc., for the Westacre Park Renovation and Expansion Project (CIP 62155).
RECOMMENDED ACTION
Staff respectfully recommends that the City Council:
1) Find that approval of a construction contract with Abide Builders, Inc. is exempt from the California Environmental Quality Act (CEQA) pursuant to Categorical Exemptions under California Code of Regulations, Title 14, Divisions 6, Chapter 3 (CEQA Guidelines), Sections 15301, 15303, and 15304, and find that the determination represents the independent judgement of the City; 2) Adopt Resolution 25-6 amending the Capital Improvement Program budget (Attachment 1); 3) Award a contract for construction services to the lowest responsive, responsible bidder, Abide Builders, Inc. in the amount not to exceed $5,988,279.50 for the Westacre Park Renovation and Expansion Project (Attachment 2);
4) Authorize the City Manager, or his designee, to execute a construction contract with Abide Builders, Inc. in the amount of $5,988,279.50;
5) Authorize the City Manager, or his designee, to make contract amendments up to 7% ($419,179.57) of the total contract value;
6) Authorize the City Manager, or his designee, to execute non-substantive changes or modifications to the contract, with approval from the City Attorney; and
7) Authorize the City Manager, or his designee, to execute amendments to extend the term of the contract, if necessary.
BACKGROUND
Westacre Park, located at 1755 Evergreen Avenue, is owned by Washington Unified School District (WUSD), but improved and maintained by the City as part of a Joint Use Agreement between WUSD and the City. The existing park amenities include a dated skate park, basketball court, a play structure without shade, and turf areas used for soccer and other sports. As part of its facility and budget planning effort, WUSD has offered additional property located immediately adjacent to the park site for a potential park expansion. The additional parcel includes a parking area, as well as empty warehouse buildings.
On June 5, 2019, the City Council authorized the submission of a grant application to the California Department of Parks and Recreation for the Statewide Park Development and Community Revitalization Program (SPP) for $7.843 million for improvements to Westacre Park. The grant application for this site included renovating the existing skatepark, removing the existing warehouse buildings, and expanding the park to provide additional parking. Proposed park improvements also include renovating the basketball court and play fields, installing new play equipment with added shade structure, creating a shaded seating area, adding a multi-use sports court, developing walking loops, installing lighting, enhancing landscaping, constructing a restroom building to support athletic field use, and incorporating any other improvements identified through the community engagement process.
On December 7, 2021, the City was notified of successfully receiving $7,843,000 of SPP grant funding for design and construction improvements to Westacre Park and subsequently entered into a grant agreement with the California Department of Parks and Recreation for this funding on May 5, 2022. All work on the project must be completed by the end of the grant performance period, which ends December 1, 2027. 14 Construction Contract to Abide Builders, Inc. for the Westacre Park Renovation and Expansion Project (CIP 62155) February 19, 2025
On April 1, 2022, the Capital Projects Department issued a Request for Proposals (RFP) for the design of the Westacre Park Expansion and Renovation Project improvements. City staff received five (5) proposals from design firms, which were ranked and evaluated by staff from the Capital Projects and Parks and Recreation departments. Melton Design Group, Inc. (MDG) ranked first based on the specified criteria. MDG submitted a robust proposal that incorporated all elements that were identified in the SPP grant application.
On July 20, 2022, the City Council approved a professional services contract with MDG for the design of the Westacre Park Expansion and Renovation Project. MDG completed the design phase in September 2024, and the project was submitted for building permits. A formal invitation to bid was then released.
On May 28, 2024, the City of West Sacramento was notified that the Rotary Club of West Sacramento had chosen to gift $150,000 from the Sutter Health Community Investment Program to support the creation of a Westacre Reflexology Path and Labyrinth.
ANALYSIS
On September 26, 2024, pursuant to the Public Contract Code, the project was publicly advertised for construction in the City of West Sacramento News Ledger, on the City of West Sacramento website, and on Opengov (an online procurement system). At the close of the bidding period on December 12, 2024, three (3) proposals were received. The results are as follows:
Table 1: Bid Results
Rank Contractor Total Bid
1 Abide Builders, Inc. $5,988,279.50
2 Imagecon, Inc. $6,165,167.59
3 JPB Designs, Inc. $6,264,162.00
After reviewing and evaluating all proposals, staff received a bid protest asserting that the top-ranked bidder’s submission should be disqualified as unresponsive due to two undervalued items in their cost table. Following consultation with the City Attorney, staff determined that the bid submitted by Abide Builders, Inc. was responsive and met all requirements outlined in the bid documents. Abide Builders also affirmed their commitment to stand by the low-valued bid items. Based on a thorough evaluation, staff identified Abide Builders, Inc. as the lowest responsive and responsible bidder. Therefore, staff recommends that the City Council approve awarding the construction contract to Abide Builders, Inc. for the bid amount of $5,988,279.50.
The construction contract includes the following amenities and improvements to support the park use: an updated skate park and pump track, a splash pad, a climbing wall, public restroom facilities, basketball, pickleball, and futsol courts, soccer fields, shade structures, a health and fitness labyrinth, play structures, site lighting, trash receptacles, and updated parking areas that conform to ADA requirements.
Environmental Considerations
The construction contract for Westacre Park is exempt from the California Environmental Quality Act (CEQA) pursuant to Categorical Exemptions under California Code of Regulations, Title 14, Divisions 6, Chapter 3 (CEQA Guidelines), Sections 15301, 15303, and 15304. As part of the Statewide Park Program grant application submittal, on June 5, 2019, the City Council approved a Notice of Exemption (NOE) for the project. A NOE will also be filed in conjunction with the approval of this contract.
Commission Recommendation
Over the past several years, both the Parks, Recreation and Intergenerational Services Commission, and Arts, Culture and Historic Preservation Commission have provided input on the Westacre Park Expansion and Renovation project as part of a robust community engagement process. On April 5, 2022, the Parks Recreation, and Intergenerational Services Commission received an update on the Parks and Recreation Department’s major projects and programs for 2022-2025, which included the Westacre Park Expansion and Renovation Project. The Commission unanimously supported moving the project forward and encouraged staff to begin park maintenance planning so that a plan and funding will available upon project completion to maintain the new improvements.
Strategic Plan Integration
Not applicable. 15
Construction Contract to Abide Builders, Inc. for the Westacre Park Renovation and Expansion Project (CIP 62155) February 19, 2025
Alternatives
The Council’s primary alternatives are summarized below:
1) Approve the recommended actions as described above in this report. 2) Reject the recommended actions, or direct staff to alter the recommended actions. 3) Defer or cancel the project.
Staff recommends that the Council proceed with Alternative 1, as Alternative 2 is not recommended due to its potential to significantly delay the project and put the grant funding in jeopardy due to not meeting schedule milestones. The consequence of not meeting the grant deadline could require the City to return the grant funds received.
Alternative 3 is not recommended because not approving the recommended action or cancelling the project would forfeit vital state grant funding, hinder the much-needed revitalization of a key community asset, and ultimately limit opportunities for enhanced recreation and community engagement. This decision would negatively impact our residents and undermine our commitment to fostering a vibrant, sustainable community.
Coordination and Review
This report was prepared by the Capital Projects Department in coordination with, and reviewed by, the Parks and Recreation Department, the City Manager’s Office, and the Finance Department.
Budget/Cost Impact
This project is funded by the $7,843,000 Proposition 68 Statewide Park Development and Community Revitalization Program (SPP) grant and appropriated in the current year’s budget (CIP 62155). Additional funds are requested to fully fund the improvements at Westacre Park. An additional appropriation of $150,000 from the Rotary Club of West Sacramento and $118,751 is proposed to be funded through a transfer from the Park Improvement Fund (211). Table 2 provides the current and future project expenses.
Table 2: Current and Future Project Expenses
Design Phase
Melton Design Group $489,902
Construction Phase
Prepurchase Items (playground equipment, restroom) $906,954 Abide Builders, Inc. $5,988,280
All Contract Contingencies $583,360
Staff Time/ICAP $419,180
Labor Compliance/Special Inspections, etc. $60,000
1% Public Art Fee $64,075
Total Project Cost $8,511,751
Breakdown
Total projected costs $8,511,751
Current funds allocated to CIP 62155 $8,243,000
41Additional Funding Needed $268,751
Table 3: Project Funding Sources and Need
Funding Sources
Donation From Rotary Club of West Sacramento $150,000
Fund 211-9211 – Park Improvement Fund $118,751
16 Construction Contract to Abide Builders, Inc. for the Westacre Park Renovation and Expansion Project (CIP 62155) February 19, 2025
ATTACHMENTS
1. Resolution 25-6
2. Construction Contract with Abide Builders, Inc.
3. Vicinity Map
4. NOE
17 Attachment 1
RESOLUTION 25-6
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF WEST SACRAMENTO
APPROVING A CAPITAL IMPROVEMENT PROGRAM (CIP) BUDGET AMENDMENT OF $268,751 TO FULLY FUND THE WESTACRE PARK RENOVATION AND EXPANSION PROJECT (CIP 62155) FOR FISCAL YEAR 2024/25
WHEREAS, the City successfully received $7,843,000 through the Statewide Park Development and Community Revitalization Program (SPP) Grant on December 7, 2021; and WHEREAS, CIP 62155 – Westacre Park Renovation and Expansion Project, was established, and an appropriation of $400,000 from Park Impact Fee was approved to fund the project, along with the grant funding received; and
WHEREAS, on July 20, 2022, City Council awarded a professional services contract with Melton Design Group to provide Architect and Design Services; and WHEREAS, on November 20, 2024, City Council approved the pre-purchase of a prefabricated restroom building from The Public Restroom Company; and WHEREAS, staff is recommending City Council to award a construction contract with Abide Builders, Inc. in the amount of $5,988,279.50 for the completion of the project; and WHEREAS, on May 28th, 2024, the Westacre Reflexoloy Path and Labyrinth was gifted $150,000 in funding from West Sacramento Rotary Club; and WHEREAS, staff is proposing a transfer of $118,751 from the Park Improvement Fund (211) to fully fund the project, and
WHEREAS, the City Council has considered all information related to this matter, as presented at the public meetings of the City Council identified herein, including any supporting reports by City staff, and any other information provided during public meetings; and NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of West Sacramento as follows:
1. The City Council hereby approves amendments to the Capital Improvement Program (CIP) for the 2024/25 fiscal year as listed below:
SOURCES
$118,751 400-9900-4990/400-62155-4990 Transfer into project $150,000 400-9900-4800/400-62155-4800 Donation from Rotary Club $118,751 211-0000-3110 PIF Fund Balance
$268,751 TOTAL SOURCES
USES
$118,751 211-9211-5950 Transfer from P.I. Fund
$268,751 400-9900-5530/400-62155-5800 Westacre Park Reno Project $268,751 TOTAL USES
*Note: Interfund transfers not included in total to avoid duplication of total costs. 18 Resolution 25-6 Amending the Capital Improvement Program for CIP 62155
2. The City Council hereby finds that the facts set forth in the recitals to this Resolution are true and correct and establish the factual basis for the City Council’s adoption of this Resolution.
3. This Resolution shall take effect immediately upon its adoption.
PASSED AND ADOPTED by the West Sacramento City Council this 19h day of February 2025, by the following vote:
AYES:
NOES:
ABSENT:
Martha Guerrero, Mayor
ATTEST:
Jennifer Cusmir, City Clerk
19 Abide Builders, Inc.
CPC24-355 Westacre Park Renovation and Expansion
Project Expires: 180 Working Days
Updated 8/3/23
CONSTRUCTION CONTRACT
THIS CONTRACT made on February 19
th
, 2025, by and between the CITY OF
WEST SACRAMENTO (“City”), and Abide Builders, Inc., hereinafter “Contractor”. The City and Contractor may be collectively referred to as the “parties”.
The parties have mutually covenanted and agreed as follows:
1. THE CONTRACT DOCUMENTS:
The complete Contract consists of the following documents (“Contract Documents”):
Construction Contract (See Part 2)
Payment Bond to accompany Contract (See Part 2)
Performance Bond to accompany Contract (See Part 2)
Contractor’s Certification Regarding Workers’ Compensation (See Part 2) General Conditions (See Part 3)
Supplemental Conditions (Special Provisions) (See Part 4) Drawings
Technical Specifications (See Part 4)
Change Orders
City of West Sacramento Standard Specifications 2002, with Amendments #1 & #2 State of California Department of Transportation (Caltrans) Standard Specifications 2015 Contractor’s Emergency Invoice (Accepted Bid)
2. THE WORK:
The Contractor agrees to furnish all tools, equipment, apparatus, facilities, labor, transportation, and material necessary to perform and complete in a good and workmanlike manner, the Westacre Park Renovation and Expansion Project, “Project” as called for, and in the manner designated in, and in strict conformity with, the Contract Documents. It is understood and agreed that the tools, equipment, apparatus, facilities, labor, transportation, and material shall be furnished and the work performed and completed as required in the Drawings and Specifications under the sole direction and control of the Contractor, and subject to inspection and approval of the City, or its representatives. The City hereby designates as its representative for the purpose of this Contract the following named person: Megan Gideon
3. CONTRACT PRICE:
The City agrees to pay and the Contractor agrees to accept, in full payment for the work above agreed to be done, the sum of $5,988,279.50 for the Project subject to additions and deductions as provided in the Contract Documents.
4. COMPLETION DATE:
The Project shall be commenced on the date specified in the Notice to Proceed. The total project will be completed within one hundred eighty (180) working days, as defined in the General Conditions, after the date stated in the Notice to Proceed. 20 Abide Builders, Inc.
CPC24-355 Westacre Park Renovation and Expansion
Project Expires: 180 Working Days
Updated 8/3/23
5. NOTICE AND SERVICE THEREOF:
Any notice from one party to the other under the Contract shall be in writing and shall be dated and signed by the party giving such notice or by a duly authorized representative of such party. Any such notice shall not be effective for any purpose whatsoever unless served in the following manner, namely:
(a) If the notice is given to the City, by personal delivery thereof to the Director of Capital Projects, or by depositing the same in the United States mail, enclosed in a sealed envelope, postage prepaid, and certified; addressed to the City at:
City of West Sacramento
Ariana Adame, Director of Capital Projects
1110 West Capitol Avenue, 1st Floor
West Sacramento, CA 95691
(b) If the notice is given to the Contractor, by personal delivery thereof to said Contractor or to its duly authorized representative at the site of the project, or by depositing the same in the United States mail, enclosed in a sealed envelope, postage prepaid, and certified; addressed to the Contractor at:
Business Abide Builders, Inc.
Attention Philip Pizzo
Street Address 825 Riverside Pkwy, Ste 120
City, State, Zip Code West Sacramento, CA 95605
(c) If the notice is given to the surety or any other person, by personal delivery to such surety or other person, or by depositing the same in the United States mail, enclosed in a sealed envelope, addressed to such surety or other person, as the case may be, at the address of such surety or person last communicated by it to the party giving the notice, postage prepaid and certified.
6. LIQUIDATED DAMAGES:
Liquidated damages as provided for in the General Conditions of the Contract shall be in the sum of One Thousand Dollars ($1000.00) for each and every day as defined therein for each different scope of work as defined by the Base Bid and each change order except as otherwise specified in the Supplemental Conditions.
7. PREVAILING WAGE:
Copies of the prevailing rate of per diem wages as determined by the Director of the Department of Industrial Relations in accordance with Labor Code section 1773.2 are on file at the City, and copies are available for inspection at that office to any interested party on request.
Bidders shall be responsible for verifying with the Director of the Department of Industrial Relations that all such copies of the prevailing rate provided by the City are current and accurate. The requirement to pay the wage rate so specified is further detailed in the General Conditions.
21 Abide Builders, Inc.
CPC24-355 Westacre Park Renovation and Expansion
Project Expires: 180 Working Days
Updated 8/3/23
8. CONTRACTOR REGISTRATION
By the execution of this Contract, Contractor hereby certifies that it is registered with the California Department of Industrial Relations as required pursuant to Labor Code section 1725.5 (Contractor registration).
IN WITNESS WHEREOF, four (4) identical counterparts of this Contract, each of which shall for all purposes be deemed an original, have been duly executed by the above-named parties, on the date noted on the first page of this Contract.
ELECTRONIC TRANSMISSION OF CONTRACT AND SIGNATURE. By electronically signing this document in electronic form, Parties agree that this Agreement may be transmitted and signed electronically by all Parties, and that such signatures shall have the same force and effect as original signatures, in accordance with California law and regulations, including but not limited to Civil Code Section 1633.7
Date Philip Pizzo, President Abide Builders,
Inc.
Date Amanda Berlin, Assistant City Manager
Approved as to form:
Jeffrey Mitchell, City Attorney
Attest:
Jennifer Cusmir, City Clerk
22 Base Bid Items
Line Item Description Quantity Unit of Unit Cost Total
1 Mobilization 1 LS $50,000.00 $50,000.00
1.1 Erosion Control (SWPPP) 1 LS $10,000.00 $10,000.00
1.2 Site Drainage Per Plan 1 LS $150,000.00 $150,000.00
1.3 Traffic Control Plan 1 LS $35,000.00 $35,000.00
1.4 Demolition Per Plan 1 LS $100,000.00 $100,000.00
1.5 Grading 480 CY $650.00 $312,000.00
1.6 Basketball Court – Resurface and basketball 4800 SF $7.00 $33,600.00
1.7 Decomposed Granite Surfacing 20000 SF $6.00 $120,000.00
1.8 Concrete Surfacing – Vehicular Sidewalk 6200 SF $12.00 $74,400.00
1.9 Concrete Surfacing – Pedestrian Sidewalk 24000 SF $12.00 $288,000.00
1.1 Pickleball/Multi-Use Courts 15200 SF $10.00 $152,000.00
1.11 Advanced Acrylic Court Surfacing and Striping 20000 SF $5.00 $100,000.00
1.12 Asphalt Parking Lot 16500 SF $5.00 $82,500.00
1.13 Parking lot concrete curb – Type A 1200 LF $45.00 $54,000.00
1.14 Commercial Driveway – Detail #206 300 SF $12.00 $3,600.00
1.15 Colored Concrete at Splash Pad 500 SF $13.00 $6,500.00
1.16 Concrete Seat Walls 500 LF $45.00 $22,500.00
1.17 12” Concrete Mow Curb 120 LF $25.00 $3,000.00
1.18 Concrete Climbing Wall 1 LS $300,000.00 $300,000.00
1.19 Concrete Stairs 24” Tread 300 LF $25.00 $7,500.00
1.2 Concrete Terraces 60” Tread 140 SF $30.00 $4,200.00
1.21 Concrete Ramps 320 SF $11.00 $3,520.00
1.22 Railing 228 LF $78.00 $17,784.00
1.23 Pre-Purchased Restroom/Pumphouse Pad 1 LS $15,000.00 $15,000.00
1.24 Sewer Line Connection to Restroom 1 LS $2,500.00 $2,500.00
1.25 Site Furnishings 1 LS $260,000.00 $260,000.00
1.26 All-Wheel Park (Skatepark) 1 LS $1,400,000.00 $1,400,000.00
1.27 Splash Pad Features & Equipment 1 LS $350,000.00 $350,000.00
1.28 Install Pre-Purchased Playground Elements 1 LS $35,000.00 $35,000.00
1.29 Install Pre-Purchased Custom Flying Bus Play
Structure & Slab Footing 1 LS $40,000.00 $40,000.00
1.3 Music Play Elements 1 LS $15,000.00 $15,000.00
1.31 Pour-In-Place Fall Material Surfacing 4200 SF $26.00 $109,200.00
1.32 EWF Fall Surfacing 2800 SF $4.00 $11,200.00
1.33 Steel Shade Structures 1 LS $200,000.00 $200,000.00
1.34 Renovate Existing Steel Building 1 LS $100,000.00 $100,000.00
1.35 6’H Chain Link Fence 520 LF $150.00 $78,000.00
1.36 6’H X 9’W Chain Link Vehicular Bypass Gate 1 EA $15,000.00 $15,000.00
1.37 10’H Chain Link Fence 115 LF $140.00 $16,100.00
1.38 8’H Chain Link Fence 630 LF $150.00 $94,500.00
1.39 4’H Chain Link Fence 124 LF $150.00 $18,600.00
1.4 6’H X 4’W Chain Link Swing Gate 6 EA $10,000.00 $60,000.00
1.41 Labyrinth/Reflexology Path 1 LS $200.00 $200.00
1.42 Turf (Sod) 7167 SF $1.50 $10,750.50
1.43 Turf (Seed) 70500 SF $.75 $52,875.00
1.44 Container Planting 1 LS $250.00 $250.00
1.45 Logs and Boulders 1 LS $30,000.00 $30,000.00
23 1.46 Irrigation & System Control 1 LS $550,000.00 $550,000.00
1.47 Potable Water 1 LS $85,000.00 $85,000.00
1.48 Site Lighting & Electrical 1 LS $500,000.00 $500,000.00
1.49 Project Permits 1 LS $3,000.00 $3,000.00
1.5 60-Day Maintenance Period 1 LS $6,000.00 $6,000.00
Total $5,988,279.50
24 25
Total Amount: $2,072,028 26
27 28
29 City of West Sacramento
Capital Projects - Construction
Ariana Adame, Director
1110 W Capitol Ave, West Sacramento, CA 95691
ADDENDA REPORT
Invitation to Bid - Westacre Park Renovation and Expansion
ADDENDA REPORT
ITB No. 24-065-ITB
Westacre Park Renovation and Expansion
RESPONSE DEADLINE: December 12, 2024 at 3:00 pm
Friday, December 13, 2024
Addenda Issued:
Addendum #1
Sep 26, 2024 12:35 PM
SPP Grant Amendment Document - Performance period extended Attachments:
· C9803026_AMD1 - signed by grantee
Addendum #2
Sep 27, 2024 10:14 AM
Amendment to Required License Classification.
An A CSLB license Classification will be acceptable as the prime contractor with a B licensed subcontractor for any building components will be acceptable to bid this project.
Addendum #3
Oct 3, 2024 8:26 AM
Please use the See What Changed link to view all the changes made by this addendum.
Date for Job Walk Revised. New Date: Thursday October 10th @ 9AM Westacre Park
1755 Evergreen Ave
West Sacramento, CA 95691
you may need to utilize onstreet parking. We will meet at the basketball court.
Addendum #4
Oct 22, 2024 5:15 PM
Question Submission, Question Response, and Proposal Submission Deadlines extended.
Question Submission Deadline: 10/25/2024 @ 5PM
Question Response Deadline: 10/29/2024 @5PM
Proposal Submission Deadline: 10/31/2024 @2PM
30 ADDENDA REPORT
ITB No. 24-065-ITB
Westacre Park Renovation and Expansion
**ADDITIONAL NOTE: As soon as revised plans and additional details have been provided by the design team, they will be released under Addendum 5. Any changes to the bid schedule will be updated at that point as well.
Please use the See What Changed link to view all the changes made by this addendum.
Addendum #5
Oct 24, 2024 9:31 AM
Updated Cost Tables per Addenda 5 revisions from Design Team.
Question deadline extended to Monday, 10/28 @ 5PM
Bid Submission Date extended to 11/5 @ 2PM
Please find addenda 5 revised documents, additional details, and additional specs attached to this addenda. Also included is a compiled list from the designer of the changes in the addenda.
Attachments:
· ADDEDNDA #5_5. 10001 Aquatic Sprayground
· ADDENDA #5_1. 02811 Irrigation
· ADDENDA #5_0.1 2528- 01-Table of Contents_Addenda
· ADDENDA #5 4. 321816.13 SpectraPour Specifications
· ADDENDA #5_2. 080723 Laykold Advantage System Specification · ADDENDA #5_CHAIN LINK FENCE & GATE
· ADDENDA #5_E5.0 LIGHITNG AND ELECTRICAL
· ADDENDA #5_CONC SIDEWALK DETAILS
· ADDENDA #5_COURT SURFACING
· ADDENDA #5_L2.2 SITE SECTIONS
· ADDENDA #5_SEATWALL GRADES
· ADDENDA #5_SP1.0 SPRAYGROUND UTILITY
· ADDENDA #5_UTILITY PAD
· LSI Play Structure Install Specs
· ADDENDA #5_Westacre Park_Light Pole Footing Calculations 10.18.2024 · Ecobond lbp lead defender primer
· Pickleball Light Post GBL-AIPSSS-PL-AI-POLE
· SOL Concrete Products Color Card & Stealth Seal
· Solar Path Light GBL-GS-SIE-2731
· Wired Pickleball Light GBL-AIKH45-Q-LD-AI
· ADDENDA #5_SKATEPARK FENCING
· 1520_PW Atletic BB Post
· Solar Parking Lot Light GBL-GS-PRE-(20W-40W-60W-80W-100W) Cut Sheet 31 ADDENDA REPORT
ITB No. 24-065-ITB
Westacre Park Renovation and Expansion
· ADDEDNDA #5_3. 321541.00 Permeable Decomposed Granite Paving · 2024-10-23_WESTACRE PARK_Bid Addenda #5
Addendum #6
Oct 30, 2024 2:08 PM
Updated cost table to reflect 7,167SF (from original value of 30,000SF) of sod per answered question by designer.
Please use the See What Changed link to view all the changes made by this addendum.
Addendum #7
Nov 5, 2024 2:00 PM
Question Submission, Question Response, and Proposal Submission Deadlines have been extended.
Question Submission Deadline: 11/08/2024 @ 5PM
Question Response Deadline: 11/11/2024 @5PM
Proposal Submission Deadline: 11/12/2024 @2PM
Addendum #8
Nov 11, 2024 5:50 PM
IMPORTANT: Updates to dates, bid packet, cost tables, and upcoming addenda
1. Bid Proposal due date, Question Submission Deadline, and Question Response Deadline extended. • Bid Proposal Due Date: Thursday, December 12th, 2024 @ 3PM • Question Submission Deadline: Wednesday, December 4th, 2024 @ 5PM • Question Response Deadline: Monday, December 9th, 2024 @5PM
2. Required Contractor License Type updated on Bid Packet to reflect classification A license only. • Construction License: Bidder must possess a current A Contractor’s License issued by the State of California, at the time the Bid is submitted.
3. Prime Contractor percentage requirements updated on Bid Packet:
• The Bidder is considered the Prime Contractor and shall perform at least fifty percent (50%) of the work, as determined by a percentage of the value of the work
4. Addenda Upcoming: Tentatively scheduled for release on Monday, November 18th. This will include a complete set with all requested details and clarifications. Please note that the updated set will replace both the current base set and Addenda #5.
5. Removal of Cost Table "Schedule B - Unit Prices Bid Form". This project will be awarded to lowest bidder based on lump sum for the base bid schedule.
Attachments:
· Updated 111124 Westacre Renovation CIP62155 Construction Bid Packet 32 ADDENDA REPORT
ITB No. 24-065-ITB
Westacre Park Renovation and Expansion
Addendum #9
Nov 27, 2024 5:15 AM
Fully Revised Plan set has been uploaded to the documents tab. Please review the documents tab for all revised and updated plans, details, spec sheets, etc.
Addendum #10
Dec 6, 2024 3:25 PM
Bid Questions and Answers
Please confirm that you have reviewed the attached document, which includes a comprehensive list of questions and answers regarding the bid documents. This information is current as of December 6, 2024, at 3:15 PM.
Attachments:
· Question & Answer Report
Addenda Acknowledgements:
Addendum #1
Proposal Confirmed Confirmed At Confirmed By
Abide Builders, Inc. X Oct 10, 2024 12:50 PM Jeannie Majewski Imagecon, Inc. X Oct 3, 2024 5:18 PM Donald Shane
JPB Designs Inc X Oct 22, 2024 4:10 PM Artyom Ponomarenko Addendum #2
Proposal Confirmed Confirmed At Confirmed By
Abide Builders, Inc. X Oct 10, 2024 12:50 PM Jeannie Majewski Imagecon, Inc. X Oct 3, 2024 5:18 PM Donald Shane
JPB Designs Inc X Oct 22, 2024 4:10 PM Artyom Ponomarenko Addendum #3
Proposal Confirmed Confirmed At Confirmed By
Abide Builders, Inc. X Oct 10, 2024 12:50 PM Jeannie Majewski Imagecon, Inc. X Oct 3, 2024 5:19 PM Donald Shane
JPB Designs Inc X Oct 22, 2024 4:10 PM Artyom Ponomarenko Addendum #4
Proposal Confirmed Confirmed At Confirmed By
Abide Builders, Inc. X Oct 23, 2024 8:07 AM Jeannie Majewski Imagecon, Inc. X Dec 6, 2024 8:07 AM Donald Shane
33 ADDENDA REPORT
ITB No. 24-065-ITB
Westacre Park Renovation and Expansion
JPB Designs Inc X Oct 31, 2024 2:29 PM Artyom Ponomarenko Addendum #5
Proposal Confirmed Confirmed At Confirmed By
Abide Builders, Inc. X Oct 30, 2024 11:50 AM Jeannie Majewski Imagecon, Inc. X Dec 6, 2024 8:07 AM Donald Shane
JPB Designs Inc X Oct 31, 2024 2:29 PM Artyom Ponomarenko Addendum #6
Proposal Confirmed Confirmed At Confirmed By
Abide Builders, Inc. X Nov 4, 2024 8:57 AM Jeannie Majewski Imagecon, Inc. X Dec 6, 2024 8:07 AM Donald Shane
JPB Designs Inc X Oct 31, 2024 2:30 PM Artyom Ponomarenko Addendum #7
Proposal Confirmed Confirmed At Confirmed By
Abide Builders, Inc. X Nov 5, 2024 2:10 PM Jeannie Majewski Imagecon, Inc. X Dec 6, 2024 8:07 AM Donald Shane
JPB Designs Inc X Nov 7, 2024 2:36 PM Artyom Ponomarenko Addendum #8
Proposal Confirmed Confirmed At Confirmed By
Abide Builders, Inc. X Dec 11, 2024 1:53 PM Jeannie Majewski Imagecon, Inc. X Dec 6, 2024 8:07 AM Donald Shane
JPB Designs Inc X Nov 12, 2024 8:21 AM Artyom Ponomarenko Addendum #9
Proposal Confirmed Confirmed At Confirmed By
Abide Builders, Inc. X Dec 9, 2024 8:06 AM Jeannie Majewski Imagecon, Inc. X Dec 6, 2024 8:07 AM Donald Shane
JPB Designs Inc X Dec 11, 2024 7:47 AM Artyom Ponomarenko Addendum #10
Proposal Confirmed Confirmed At Confirmed By
Abide Builders, Inc. X Dec 9, 2024 8:06 AM Jeannie Majewski 34 ADDENDA REPORT
ITB No. 24-065-ITB
Westacre Park Renovation and Expansion
Imagecon, Inc. X Dec 10, 2024 7:47 AM Donald Shane
JPB Designs Inc X Dec 11, 2024 7:47 AM Artyom Ponomarenko 35 36
37 38
39 Abide Builders, Inc.
CPC24-355 Westacre Park Renovation and Expansion
Project Expires: 180 Working Days
1795423.1 7203-038
[PROJECT NAME AND PROJECT NUMBER]
PART 2 GENERAL CONDITIONS
40 Abide Builders, Inc.
CPC24-355 Westacre Park Renovation and Expansion
Project Expires: 180 Working Days
Updated 2/17/23
PART 2: GENERAL CONDITIONS
SECTION 1
DEFINITIONS AND TERMS
1.01. GENERAL
Wherever the following abbreviations and terms, or pronouns in place of them, are used in these Conditions and other Contract Documents of which these Conditions are a part, the intent and meaning shall be interpreted as provided below.
1.02. ABBREVIATIONS
The following abbreviations may be used in the Contract Documents:
AA Aluminum Association
AASHTO American Association of State Highway/Transportation Officials ABMA American Boiler Manufacturer’s Association
ACI American Concrete Institute
AFBMA Anti-Friction Bearing Manufacturers Association
AGA American Gas Association
AGC Associated General Contractors
AGMA American Gear Manufacturer’s Association
AI The Asphalt Institute
AIA American Institute of Architects
AIEE American Institute of Electrical Engineers
AISC American Institute of Steel Construction
AISI American Iron and Steel Institute
ANSI American National Standards Institute, Inc.
APA American Plywood Association
API American Petroleum Institute
APWA American Public Works Association
ARA American Railway Association
AREA American Railway Engineering Association
ASCE American Society Civil Engineers
ASHRAE American Society of Heating, Refrigeration and Air Conditioning Engineers
ASME American Society of Mechanical Engineers
ASTM American Society for Testing and Materials
AWG American Wire Gage
AWPA American Wood Preservers’ Association
AWS American Welding Society
AWWA American Water Works Association
BHMA Builders Hardware Manufacturers Association
CCMTC California Concrete Masonry Technical Committee
CRSI Concrete Reinforcement Steel Institute
ETL Electrical Testing Laboratory
FS Federal Specification
ICBO International Conference of Building Officials
IEEE The Institute of Electrical and Electronics Engineers IES Illuminating Engineering Society
41 Abide Builders, Inc.
CPC24-355 Westacre Park Renovation and Expansion
Project Expires: 180 Working Days
Updated 2/17/23
IPCEA Insulated Power Cable Engineers Association
JICS Joint Industry Conference Standards
MBMA Metal Building Manufacturer’s Association
MSS Manufacturers Standardization Society of the Valve and Fitting Industry Standards
NBFU National Board of Fire Underwriters
NBS National Building Standards
NEC National Electrical Code
NEMA National Electrical Manufacturers Association
NFPA National Fire Protection Association
OSHA Occupational Safety and Health Act of 1970
PCA Portland Cement Association
SMACNA Sheet Metal and Air Conditioning Contractor’s National Association SSPC Steel Structures Painting Council
SSPWC Standard Specifications for Public Works Construction UBC Uniform Building Code
UL Underwriter’s Laboratory
UMC Uniform Mechanical Code
UPC Uniform Plumbing Code
USAS The United States of America Standard Institute
USBR United States Bureau of Reclamation
USPHS United States Public Health Service
WCLIB West Coast Lumber Inspection Bureau
WIC Woodwork Institute of California
1.03. DEFINITIONS
The intent and meaning of the following, wherever they appear in the Contract Documents, shall be interpreted as follows:
Acceptance - The formal Acceptance by the Engineer of the entire Contract, which has been completed in all respects in accordance with the Specifications and any, approved modifications.
Addenda - Any written change, clarification or supplement to documents issued for bidding, issued by the City or its Engineer prior to bid.
As Approved - The words “as approved”, unless otherwise qualified, shall be understood to be followed by the words “by the Engineer”.
As Shown, and As Indicated - The words “as shown” and “as indicated” shall be understood to be followed by the words “on the Plans”.
Award - The decision of the City Council to accept the proposal of the lowest responsible Bidder for the Work, subject to the execution and approval of a satisfactory contract therefore and bond to secure the performance thereof and to such other conditions as may be specified or required by law.
Bid - The offer of the Bidder for the Work when made out and submitted on the prescribed Bid form, properly signed and guaranteed. A Bid is also known as a Proposal. 42 Abide Builders, Inc.
CPC24-355 Westacre Park Renovation and Expansion
Project Expires: 180 Working Days
Updated 2/17/23
Bid Security - The cash, cashier’s check, certified check, or bidder’s bond accompanying the Bid submitted by the bidder, as a guarantee that the Bidder will enter into a Contract with the City for the performance of Work herein described.
Bidder - Any individual, firm, partnership or corporation submitting a Bid for the Work contemplated, and acting directly or through a duly authorized representative.
Bureau - United States Bureau of Reclamation.
Calendar Day - Each day shown on the calendar.
Change Order - Written order issued by the Engineer to the Contractor covering changes in the Contract and establishing the bases of compensation and time adjustments for work affected by the changes.
City - The City of West Sacramento, also referred to as the Owner.
City Council or Council - The City Council of the City of West Sacramento.
City Standard Details - The standard details contained in the City Standard Specifications as modified.
City Standard Specifications - 2002 edition of the City of West Sacramento Standard Specifications and Details as amended to date of Bid submittal.
Claim - A separate demand by the Contractor for (i) a time extension, (ii) payment of money or damages arising from work done by or on behalf of the Contractor pursuant to the contract for a public work and payment of which is not otherwise expressly provided for or the claimant is not otherwise entitled to, or (iii) an amount the payment of which is disputed by the City.
Contract - The written agreement covering the performance of the work and the furnishing of labor, materials, tools and equipment in the construction of the Work. The Contract shall include all Contract Documents and supplemental agreements amending or extending the work contemplated which may be required to complete the Work in a substantial and acceptable manner. Supplemental agreements are written agreements covering alterations, amendments, or extensions to the contract and include Addenda and change orders.
Contract Documents - Contract Documents is the collective term for all of the following documents and any other document incorporated therein by reference: Invitation to Bid, Accepted Bid (and all accompanying documents), Designation of Subcontractors, Construction Contract, Payment Bond to Accompany Contract, Performance Bond to Accompany Contract, General Conditions, Supplementary and Special Conditions, (if any), Drawings (and Specifications), Addenda, Change Orders, City of West Sacramento Standard Specifications, State of California Department of Transportation (Caltrans) Standard Specifications 2015, Contractor’s Certification Regarding Workers’ Compensation.
Contractor - The person or persons, firm, partnership or corporation or other entity who has entered into the Contract with the City to perform the Work.
County - County of Yolo, California.
43 Abide Builders, Inc.
CPC24-355 Westacre Park Renovation and Expansion
Project Expires: 180 Working Days
Updated 2/17/23
Date of Completion - Date of filing of the Notice of Completion with the Yolo County ClerkRecorder’s Office.
Date of Execution of the Contract - The date on which the Contract is signed by the City’s authorized representative.
Datum - The Figures given in the Specifications or upon the drawings after the word “Elevation” or an abbreviation of it, shall mean U.S.G.S. datum, unless otherwise noted.
Days - Unless otherwise designated, days as used in the Contract Documents shall mean calendar days.
Elevation - The figures given on the Plans or in the other Contract Documents after the word “elevation” or abbreviation of it shall mean the distance in feet above the standard datum used by the City.
Engineer - The City Engineer, or the person designated by the City as its engineering representative during the course of construction, acting either directly or through properly authorized agents, such agents acting within the scope of the particular duties delegated to them.
Extra Work - Work other than that required either expressly or implied by the Contract in its executed form.
Notice of Completion - notice of completion is the recorded project completion document filed with the Yolo County Clerk.
Or Equal - The term “or equal” shall be understood to indicate that the “equal” product be the equivalent or better than the product named in function, performance, reliability, quality, and general configuration. Determination of equality in reference to the project design requirements will be made by the Engineer.
Plans or Specification Drawings - The term “Plans” or “Specification Drawings” refers to the official plans, profiles, cross sections, elevations, details, and other Working Drawings and supplementary drawings, or reproductions thereof, signed by the Engineer, which show the location, character, dimensions, and details of the work to be performed. Plans may either be bound in the same book as the balance of the Contract Documents or bound in separate sets.
Regardless of the method of binding, Plans shall be part of the Contract Documents.
Plant - All physical, resources, facilities, machinery, equipment, staging, tools, work and storage space other than provided by the Contract, together with subsidiary essentials and necessary maintenance for proper construction and acceptable completion of the project.
Project - The entire Work to be completed under the Contract.
Project Manager - The person designated by the City as its project management representative during the course of construction, acting either directly or through properly authorized agents, such agents acting within the scope of the particular duties delegated to them. The Project Manager will be the City Engineer unless the City designates a separate Project Manager.
When a Project Manager is used for a project, the Project Manager has full authority to act as the City Engineer unless the designation specifically states otherwise. 44 Abide Builders, Inc.
CPC24-355 Westacre Park Renovation and Expansion
Project Expires: 180 Working Days
Updated 2/17/23
Shop Drawings - Drawings prepared by the fabricator or supplier showing the layout and details of components fabricated in a shop for inclusion in the permanent facility (e.g., structural steel, reinforcing steel, railings).
Site - The area upon or in which the Contractor’s operations are carried on and such other areas adjacent thereto as may be designated by the Engineer.
Specifications - The term “specifications” refers to the terms, provisions, and requirements contained herein. Where reference specifications, such as those of “ASTM”, “AASHTO”, etc. have been referred to, the applicable portions of such standard specifications shall become a part of these Contract Documents.
State - State of California.
State Standard Specifications - Standard Specifications issued by the State of California Department of Transportation, dated 2015, and as amended Bid in the supplemental conditions.
Subcontractor - The term “Subcontractor”, as employed herein, includes only those having a direct contract with the Contractor and it includes one who furnishes material worked to a special design according to the plans or specifications of this work, but does not include one who merely furnishes material not so worked and would be considered a supplier only.
Supplementary & Special Conditions Provisions - Additions, revisions, special directions, and requirements peculiar to a project and not otherwise thoroughly set forth in General and/or Specifications.
Time Limits - All time limits stated in the Contract Documents are of the essence of the Contract.
Work - All the work specified, indicated, shown or contemplated in the Contract Documents to construct the improvements, including all alterations, amendments or extensions thereto made by Change Order or other written orders of the Engineer.
Working Days - A Working day is defined as any day, except Saturdays, Sundays and legal holidays of the City.
Working Drawings - Drawings furnished by the Contractor showing the layout and details of temporary construction procedures and methods of construction, and data for construction equipment which are to be employed in the construction of the permanent facility (e.g., form drawings, erection drawings, load test pile procedures, pile hammer data, etc.).
Written Notice - “Written Notice” shall be deemed to have been duly served when delivered in person to the individual or to a member of the firm or to an officer of the corporation for whom it is intended, or if delivered at or sent by certified U.S. mail to the last business address known to the party who gives the notice as specified in the Contract.
Whenever in the Specifications or upon the drawings the words “directed”, “required”, “permitted”, “ordered”, “designated”, “prescribed”, or words of like import are used, it shall be understood that the direction, requirement, permission, order, designation or prescription of the Engineer is intended, and similarly the words “approved”, “acceptable”, “satisfactory”, or words of like import, shall mean approved or acceptable to, or satisfactory to the Engineer, unless otherwise expressly stated.
45 Abide Builders, Inc.
CPC24-355 Westacre Park Renovation and Expansion
Project Expires: 180 Working Days
Updated 2/17/23
SECTION 2
SCOPE OF WORK
2.01. INTENT OF CONTRACT DOCUMENTS
The intent of the Contract Documents is to prescribe the details for the construction and completion of the Work, which the Contractor undertakes to perform in accordance with the terms of the Contract. These General Conditions are meant to replace Division I of the State Standard Specifications for all City public works contracts which incorporate these General Conditions by reference.
Where the Specifications and Plans describe portions of the Work in general terms, but not in complete detail, it is understood that only the best general practice is to prevail and that only materials and workmanship of the first quality are to be used. Unless otherwise specified, the Contractor shall furnish all labor, materials, tools, equipment and incidentals and do all the Work involved in performing the Contract in a satisfactory and workmanlike manner.
The technical provisions are presented in sections for convenience. However, this presentation does not necessarily delineate trades or limits of responsibility. All sections of the Specifications and Plans are interdependent and applicable to the Project as a whole.
The Contract Documents are complementary, and what is called for in any one shall be as binding as if called for in all. Anything shown on the Drawings and not mentioned in the Specifications or mentioned in the Specifications and not shown on the Drawings shall have the same effect as if shown or mentioned respectively in both. Any work shown on one Drawing shall be construed to be shown in all Drawings and the Contractor will coordinate the Work and the Drawings.
If any portion of the Contract Documents shall be in conflict with any other portion, the various documents comprising the Contract Documents shall govern in the following order of precedence: Change Orders; Addenda; Shop Drawings, Drawings, Supplementary and Special Conditions; Designation of Subcontractors; Construction Contract; General Conditions; City of West Sacramento Standard Specifications; State of California Department of Transportation (Caltrans) Standard Specifications 2015.
Detail Drawings take precedence over General Drawings. As between schedules and other information given on Drawings, the Schedules shall govern. If an item is shown on any Drawing and not specifically included in Technical Specifications specific to this project, the Drawing shall govern. Any conflict or inconsistency between or in the drawings shall be submitted to the Engineer for clarification as soon as the Contractor becomes aware of such inconsistency.
2.02. CONTRACTOR’S UNDERSTANDING
It is understood and agreed that the Contractor has, by careful examination, satisfied itself as to the nature and location of the Work, the conformation of the ground, the character, quality and quantity of the materials to be encountered, the character of equipment and facilities needed preliminary to and during the prosecution of the Work, the general and local conditions, and all other matters which can in any way affect the Work under this Contract. No verbal agreement or conversation with any officer, agent or employee of the City, either before or after 46 Abide Builders, Inc.
CPC24-355 Westacre Park Renovation and Expansion
Project Expires: 180 Working Days
Updated 2/17/23
the execution of this Contract, shall affect or modify any of the terms or obligations contained herein.
2.03. CHANGES IN THE WORK
(a) The City may, at any time, by written order, make changes in the Work as deemed necessary by the Engineer. Such changes include, but are not limited to:
(1) In the Specifications or Plans;
(2) In the sequence, method or manner of performance of the Work; (3) In the owner-furnished facilities, equipment, materials, services or site; and (4) Directing acceleration of the Work.
(b) If such changes cause an increase or decrease in the Contractor’s cost of, or time required for, performance of the Contract, an equitable adjustment will be made and the Contract modified in writing accordingly.
(1) Change Orders
A change pursuant to this section will be in the form of a Change Order, which will set forth the work to be done or the method by which the change and cost adjustment, if any, will be determined, and the time of completion of the work.
Upon receipt of a Change Order, the Contractor shall proceed with the ordered work. If ordered in writing by the Engineer, the Contractor shall proceed with the work so ordered prior to actual receipt of a Change Order. A Change Order executed by the Contractor and approved by the Engineer is an executed Change Order as that term is used throughout this section.
(2) Change Order Protests
A Change Order may be issued to the Contractor at any time. Should the Contractor disagree with any terms or conditions set forth in a Change Order, which he has not executed, he shall submit a written protest to the Engineer within fifteen (15) days after the receipt of such Change Order. The protest shall state the points of disagreement and, if possible, the quantities and cost involved.
If a written protest is not submitted, payment will be made as set forth in the Change Order. Such payment shall constitute full compensation for all work included therein or required thereby. Such unprotested Change Orders shall be considered as executed Change Orders.
Where the protest concerning a Change Order relates to compensation, the compensation payable for all work specified or required by said Change Order to which such protest relates will be determined in the same manner as provided in Section 2.04 of this section. The Contractor shall keep full and complete records of the cost of such work and shall permit the Engineer to have such access thereto as may be necessary to assist in the determination of the compensation payable for such work. Where the protest concerning a 47 Abide Builders, Inc.
CPC24-355 Westacre Park Renovation and Expansion
Project Expires: 180 Working Days
Updated 2/17/23
Change Order relates to the adjustment of time and for completion of the Work, the time to be allowed therefor will be determined as provided in this section.
The consent of the Contractor’s sureties shall not be required as to any change or Extra Work, and the liability of the Contractor’s Bonds shall be increased or decreased accordingly without notice to the sureties.
2.04. PROCEDURES AND ALLOWABLE COSTS ON CHANGES AND ADDITIONS TO WORK
(a) Forms of Payment
If the change in, or addition to, the Work will result in an increase in the contract sum, the City shall have the right to require the performance thereof. The compensation to be paid for any such work shall, in the City’s sole discretion, be determined in one or more of the following ways:
(1) By extension of agreed unit prices, if unit prices are required by the City’s Bid form and provided with Contractor ‘s bid;
(2) By revision of unit prices;
(3) By proposal and Acceptance of an agreed upon lump sum; and (4) On a force account basis.
Until one of the above methods is agreed on, or if the Work is to be paid for on a time and materials basis, the Contractor shall keep full and complete records of the cost of such work in the form and manner prescribed by the Engineer and shall permit the Engineer to have access to such records as may be necessary to assist in the determination of the compensation payable for such work.
(b) Lump Sum Payment
The City, in its sole and absolute discretion, may request a lump sum proposal by Contractor to perform the change in, or addition to, the Work performed. Such lump sum proposal shall be submitted by the Contractor within ten (10) days of the City’s request therefor.
Request for a lump sum proposal by City shall not be deemed an election by City to have the Work performed on a lump sum basis. Costs of preparing the proposal shall not be compensable.
(1) Contents of Lump Sum Proposal
(2) The Contractor’s proposal shall be itemized and segregated by labor and materials for the various components of the change (no aggregate labor total will be acceptable). The proposal shall be accompanied by signed proposals of any Subcontractors, which will perform any portion of the change, and of any persons who will furnish materials or equipment for incorporation therein. The proposal shall also include the Contractor’s estimate of the time required to perform said changes or additional work. (3) Computation of Labor Costs
48 Abide Builders, Inc.
CPC24-355 Westacre Park Renovation and Expansion
Project Expires: 180 Working Days
Updated 2/17/23
The portion of the proposal relating to labor, whether by the Contractor’s forces or the forces of any of its Subcontractors, may include the projected wages of the reasonably anticipated Site labor, including foremen, who will be directly involved in the change in the Work.
These projected wages shall not include charges for assistant superintendents, superintendents, office personnel, timekeepers and maintenance mechanics.
Labor costs may also include Contractor’s overhead and profit which shall be computed by adding to the labor costs either up to fifteen percent (15%) of the projected wages, but not payroll costs, or the labor surcharge set forth in the California Department of Transportation publication entitled Labor Surcharge And Equipment Rental Rates, which is in effect on the date upon which the Work is accomplished and which is a part of the Contract. The method of computing the overhead and profit shall be solely within the discretion of the City.
The labor surcharge, if used, shall constitute full compensation for all payments imposed by State and Federal laws and for all other payments made to, or on behalf of, the workmen, other than actual wages as defined above. No time or charges will be allowed except when the workers are actually engaged in the proper, efficient and diligent performance or completion of the extra work as authorized. Overtime shall not be worked without prior approval of the Engineer.
(4) Computation of Equipment and Materials Costs
The portion of the proposal relating to materials may include the reasonably anticipated direct costs to the Contractor or to any of its Subcontractors of materials to be purchased for incorporation in the change in the Work. This portion of the proposal may also include transportation and applicable sales or use taxes. Up to fifteen percent (15%) of these direct costs may be included as overhead and profit for the Contractor or any such Subcontractor (such overhead and profit to include all small tools).
This portion of the proposal may further include the Contractor’s and any of its Subcontractors’ reasonably anticipated costs for the rental and operation of prime construction and automotive equipment furnished and used in connection with the change in the Work. The equipment rental and operation rates used shall be the latest edition of the Department of Transportation, Division of Construction, Equipment Rental Rates. These costs shall not include charges for listed equipment or major tools with a new cost of five hundred dollars ($500.00) or less. No time charges shall be allowed except for equipment actually used for the proper and efficient performance or completion of the authorized change in the Work. (5) Subcontractors
The lump sum proposal may include up to five percent (5%) of the amount, which the Contractor will pay to any of its Subcontractors for the change in the Work as allowable overhead and profit to the Contractor.
(6) Failure to Submit Lump Sum Proposal
In the event that the Contractor fails to submit its proposal within the designated period, the Engineer may direct the Contractor to proceed with the change or addition to the Work and the Contractor shall so proceed. The Engineer shall unilaterally determine the reasonable costs and time to perform the work in question, which determination shall be final and binding upon the Contractor.
49 Abide Builders, Inc.
CPC24-355 Westacre Park Renovation and Expansion
Project Expires: 180 Working Days
Updated 2/17/23
(7) Failure to Agree on Lump Sum Amount
In the event that the parties are unable to agree as to the reasonable costs and time to perform the change in or addition to the Work based upon the Contractor’s proposal and the Engineer and City do not elect to have the change in the Work performed on a time and material basis, the Engineer and City shall make a unilateral determination of the reasonable cost and time to perform the change in the Work, based upon their own estimates, the Contractor’s submission or combination thereof. In such instances, a Change Order shall be issued for the amount of costs and time determined by the Engineer and the City and shall become binding upon the Contractor unless the Contractor submits its protest in writing to the City within thirty (30) days of the issuance of the Change Order. The City has the right to direct the Contractor in writing to perform the change in the Work, which is the subject of the Change Order. Failure of the parties to reach agreement regarding the costs and time of performing the change in the Work and/or any pending protest shall not relieve the Contractor from performing the change in the Work promptly and expeditiously.
(c) Payment by Unit Prices
If any of the items included in the lump sum proposal are covered by unit prices contained in the contract document, the City may, if it requires the change in the Work to be performed on a lump sum basis, elect to use these unit prices in lieu of the similar items included in the lump sum proposal in which event an appropriate deduction will be made in the lump sum amount prior to the application of any allowed overhead and profit percentages. No overhead and profit shall be applied to any unit prices. (d) Payment on a Force Account Basis
If the City elects to have the change or addition to the Work performed on a force account basis, the Work shall be performed, whether by the Contractor’s forces or the forces of any of its Subcontractors or Sub-Subcontractors, and payment shall be made subject to the following provision. The Contractor will be paid the direct costs of the labor, equipment and materials used in performing the force account work determined as hereinafter provided. (1) For labor, the Contractor will be paid the cost of labor for the workers (including foremen when authorized by the Engineer or Project Manager) used in the actual and direct performance of the work. The cost of labor, whether the employer is the Contractor or any or any Subcontractor of any tier, shall be actual wages, including basic hourly wage, health and welfare payments and pension payments incurred in performing the force account work, plus any travel and subsistence payments for the workers performing such work and made necessary thereby. To the actual wages shall be added a labor surcharge as set forth in the State Department of Transportation publication entitled “Labor Surcharge and Equipment Rental Rates”, as in effect on the date the work is performed. The labor surcharge shall be deemed to encompass the City’s entire liability to reimburse the Contractor for workers compensation insurance payments, social security payments, Medicare payments, federal unemployment insurance payments, state unemployment insurance payments and state training taxes, made necessary by the force account work.
(2) For equipment, the Contractor will be paid for the use of equipment at the rental rates listed for that equipment in the State Department of Transportation publication entitled “Labor Surcharge and Equipment Rental Rates”, which is in effect on the date the work is performed, regardless of ownership or any rental agreement entered into by Contractor for such equipment. The rental rate paid in accord with said publication shall be deemed to include 50 Abide Builders, Inc.
CPC24-355 Westacre Park Renovation and Expansion
Project Expires: 180 Working Days
Updated 2/17/23
the cost of fuel, oil, lubrication, supplies, small tools, attachments, repairs and maintenance, depreciation, storage and insurance for said equipment. Rental time will not be paid when equipment is inoperable due to breakdowns, repairs or maintenance. Payment for loading, transporting and unloading time will be in accordance with the State Standard Specifications applicable to loading, transporting and unloading equipment for force account work, as applicable as of the date the equipment is loaded, transported or unloaded. (3) For materials used in the work, the City will pay for materials furnished by the Contractor and necessarily used in the force account work. Prior to markups as set forth below, the amount paid shall be the price paid by the actual purchaser to the actual supplier plus any necessary actual costs of handling the materials.
Contractor may add fifteen percent (15%) to the total labor, equipment and material charges as the total overhead and profit to the entity or entities actually performing the force account work. If the entity or entities actually performing the work are Subcontractors or Sub-Subcontractors, the Contractor shall be allowed five percent (5%) of the total charge of the performing entity or entities (including mark- up) as Contractor’s mark-up. No other mark-ups shall be allowed hereunder.
The Contractor shall submit to the City daily work and material tickets, to include the identification number assigned to the change in the Work, the location and description of the change in the Work, the classification of labor employed (and names and social security numbers), hours expended, the material used, the equipment rented (not tools) and such other evidence of cost as the City may require. The City may require authentication of all time and material tickets and invoices by persons designated by the City for such purpose. The failure of the Contractor to secure any required authentication shall, if the City elects to treat it as such, constitute a waiver by the Contractor of any claim for the cost of that portion of the Change in the Work covered by a non-authenticated ticket or invoice; provided, however, that the authentication of any such ticket or invoice by the City shall not constitute an acknowledgment by the City that the items thereon were reasonably required for the Change in the Work. (e) Limitations on Changes
The Contractor shall not be entitled to any amount for indirect costs, damages or expenses of any nature, including, but not limited to, so-called “impact” costs, labor inefficiency, wage, material or other escalations beyond the prices upon which the proposal is based and to which the parties have agreed pursuant to the provisions of this section, and which the Contractor, its Subcontractors and Sub-Subcontractors or any other person may incur as a result of delays, interferences, suspensions, changes in sequence or the like, for whatever cause, whether reasonable or unreasonable, foreseeable or unforeseeable, or avoidable or unavoidable, arising from the performance of any and all changes in the work performed pursuant to this section. It is understood and agreed that the Contractor’s sole and exclusive remedy in such event shall be recovery of its direct costs as compensable hereunder and an extension of the time of the Contract, but only in accordance with the provisions of the Contract Documents.
It is expressly agreed that Contractor shall not be entitled to claim damages for anticipated profits on any portion of the Work that may be deleted.
The amount of any adjustment for work deleted shall be estimated at the time deletion of work is ordered and the estimated adjustment will be deducted for the subsequent monthly pay estimates. The City reserves its rights under Section 3.20 to audit Contractor’s as-Bid profit in 51 Abide Builders, Inc.
CPC24-355 Westacre Park Renovation and Expansion
Project Expires: 180 Working Days
Updated 2/17/23
connection with any deductive change, to arrive at a final adjustment. Contractor’s as-Bid profit shall be reduced pro rata according to the proportion of the original contract value less as-Bid profit, represented by the work deleted.
The City reserves the right to contract with any person or firm other than the Contractor for any or all Extra Work.
2.05. UNILATERAL CHANGE IN OR ADDITION TO THE WORK
Notwithstanding the above, the City, directly or through the Engineer, may direct the Contractor in writing to perform changes in or additions to the scope of the Contract. The Contractor shall perform such work and the parties shall proceed pursuant to the provisions of Section 2.04.
2.06. DIFFERING SITE CONDITIONS
The Contractor shall promptly, and before the following conditions are disturbed, notify the City in writing of any:
(a) Material that the Contractor believes may be material that is hazardous waste, as defined in Section 25110.02 of the Health and Safety Code, that is required to be removed to a Class I, Class II, or Class III disposal site in accordance with provisions of existing law; or (b) Subsurface or latent physical conditions at the Site differing from those indicated in the Contract Documents; or
(c) Unknown conditions at the Site of any unusual nature, different materially from those ordinarily encountered and generally recognized as inherent in work of the character provided for in the Contract.
The Engineer shall thereupon promptly investigate the conditions. If the Engineer finds that they do involve hazardous waste, or do materially differ and cause an decrease or increase in the Contractor’s cost or time of performance, the Engineer will issue a change order as appropriate. Any increase or decrease of cost resulting from such changes shall be adjusted in the manner provided in Section 2.04 for adjustments as to extra and/or additional work and changes. In the event that a dispute arises between the City and the Contractor, whether the conditions materially differ, or involve hazardous waste, or cause and decrease or increase the Contractor’s cost of, or time required for, performance of any part of the Work, the Contractor shall not be excused from any scheduled completion date provided by the Contract, but shall proceed with all work to be performed under the Contract, the procedures applicable to claims for extra costs shall then apply.
2.07. CLAIMS FOR EXTRA COSTS
(a) Notice of Potential Claims
(1) It is hereby mutually agreed that the Contractor shall not be entitled to the payment of any additional compensation for any cause, including any act, or failure to act, by the Engineer, or the happening of any event, thing or occurrence, unless the Contractor provides the Engineer with written notice of the potential claims as hereinafter specified.
Compliance with this section, however, shall not be a prerequisite as to matters within the scope of the protest provisions in Section 2.03.
52 Abide Builders, Inc.
CPC24-355 Westacre Park Renovation and Expansion
Project Expires: 180 Working Days
Updated 2/17/23
The written notice of potential claims shall set forth the reasons for which the Contractor believes additional compensation will or may be due, the nature of the costs involved, and, insofar as possible, the amount of the potential claim. The notice as above required shall be given to the Engineer prior to the time that the Contractor commences performance of the Work giving rise to the potential claim for additional compensation, if based on an act or failure to act by the Engineer, or in all other cases within ten (10) days after the happening of the event, thing or occurrence giving rise to the potential claim. (b) Construction Dispute
(1) The Contractor may submit a dispute to the Engineer concerning any matter for which a protest under Section 2.03, or a notice of potential claim, is filed. Such disputes, or potential claims, shall be submitted to the Engineer within sixty (60) days following the submission of said protest or notice, unless, due to the nature of the dispute or the uncompleted state of the Work, it is impracticable to determine the amount or the extent of the claim within such period. In such cases, disputes shall be submitted at the earliest practicable time in which such a determination can be made. In any event, all disputes shall be filed on or before the date of the final release by the Contractor as provided for in Section 7.09. (2) All disputes shall be in writing and shall set forth clearly and in detail, for each item of additional compensation requested, the reasons for the dispute, reference to applicable provisions of the Specifications, the nature and the amount of the cost involved, the computations used in determining such costs, all pertinent factual data and all the documents necessary to substantiate the dispute. The Contractor shall maintain complete and accurate records of the cost or any portion of the Work for which additional compensation is claimed, and shall provide the Engineer with copies thereof, as required. The Engineer shall provide a written decision to the dispute or potential claim as soon as practicable but not later than 30 days following receipt thereof.
(c) Resolution of Construction Claims
(1) To the extent that the Contractor disputes the Engineer’s Written Decision issued pursuant to Section 4.07(b)(2), or to the extent the Engineer fails to issue a timely written decision, the Contractor may file a written claim, as defined by Public Contract Code section 9204(c)(1), with the City including reasonable documentation to support the claim. Upon receipt of the claim, the City shall conduct a reasonable review of the claim, and within a period not to exceed 45 days, the City shall provide the Contractor with a written statement identifying what portion of the claim is disputed and what portion is undisputed. The time in which the City must provide a written statement may be extended by mutual agreement of the parties as specified by Public Contract Code section 9204(d)(1)(C). The City shall pay any undisputed portion of the claim within 60 days after issuance of its written statement. (2) Claims submitted by the Contractor shall be accompanied by a notarized certificate containing the following language:
Under the penalty of law for perjury or falsification and with specific reference to the California False Claims Act, Government Code section 12650, et. seq., the undersigned,
Philip Pizzo
53 Abide Builders, Inc.
CPC24-355 Westacre Park Renovation and Expansion
Project Expires: 180 Working Days
Updated 2/17/23
President
Abide Builders, Inc.
hereby certifies that the claim for the additional compensation and time, if any, made herein for the work on this contract is a true statement of the actual costs incurred and time sought, and is fully documented and supported under the contract between parties.
Dated:
/s/
Subscribed and sworn before me this _____ day
of
Notary Public
My commission expires
Failure to submit the notarized certificate will be sufficient cause for denying the claim.
Any claim for overhead type expenses or costs, in addition to being certified as stated above, shall be supported by an audit report of any independent Certified Public Accountant. Any such overhead claim shall also be subject to audit by the City at its discretion.
Any costs or expenses incurred by the City in reviewing or auditing any claims that are not supported by the Contractor’s cost accounting or other records shall be deemed to be damages incurred by the City within the meaning of the California False Claims Act. (3) Meet And Confer Regarding Unresolved Claims. If the Contractor disputes the City’s written statement issued pursuant to Section 4.07(c)(1) or if the City fails to issue a timely written response, the Contractor may demand in writing an informal conference to meet and confer for settlement of the issues in dispute. Upon receipt of a demand in writing sent by registered mail or certified mail, return receipt requested, the City shall schedule a meet and confer conference within 30 days for settlement of the dispute. The meet and confer conference shall be attended by senior executives of the parties who have authority to settle the controversy. Within 10 business days following the conclusion of the meet and confer conference, the City shall provide the Contractor with a written statement identifying the portion of the claim that remains in dispute and the portion that is undisputed. The City shall pay any undisputed portion of the claim within 60 days after it issues its written statement. (4) Mediation. If the Contractor disputes, in writing, any portion of the City’s written statement as issued under Section 4.07(c)(3), the disputed items shall be submitted to nonbinding mediation according to the provisions of Public Contract Code section 9204(d)(2), and any costs of mediation shall be allocated as set forth in that section. Upon receipt of a claim, the City and the Contractor may agree to waive, in writing, mediation. 54 Abide Builders, Inc.
CPC24-355 Westacre Park Renovation and Expansion
Project Expires: 180 Working Days
Updated 2/17/23
(5) Failure to Respond or Pay. If the City fails to timely respond to a claim from the Contractor or otherwise fails to meet the time requirements of Public Contract Code section 9204, the claim shall be deemed rejected in its entirety. Additionally, amounts not timely paid in the manner required by Public Contract Code section 9204 shall bear interest at 7 percent per annum.
(6) Subcontractor Claims. If a Subcontractor or a lower tier Subcontractor lacks legal standing to assert a claim against the City because privity of contract does not exist, the Contractor may present to the City a claim on behalf of the Subcontractor or lower tier Subcontractor pursuant to Public Contract Code section 9204(d)(5).
2.08. CIVIL ACTION PROCEDURES
(a) Alternative Dispute Resolution of Claims of $375,000.00 or Less. (1) Claims Less Than $375,000.00. Notwithstanding any other provision herein but after compliance with the provisions of Public Contract Code section 9204 as set forth in Section 4.07, claims of $375,000.00 or less shall be resolved pursuant to the alternative dispute resolution procedures set forth in Public Contract Code section 20104 et seq. “Claim” for this purpose means a separate demand by the Contractor for a time extension, payment of money or damages arising from work done by or on behalf of the Contractor pursuant to the Contract, for which payment is expressly provided, or the Contractor is otherwise entitled to, or an amount the payment of which is disputed by the City. (2) Submission of Claims Less than $375,000.00. The Contractor shall submit its claim of $375,000.00 or less to the City in writing, within the time frames established under paragraph 4.07, but no later than before the final payment is made. The City shall respond within the time provided by statute. If the Contractor disagrees with the response or the City fails to respond within the time permitted, the Contractor shall notify the City of the disagreement in writing within fifteen (15) days from the date of the response or expiration of the time permitted to respond and demand a meet-and-confer conference. The City shall schedule a meet-and-confer conference within thirty (30) days of the demand. The meet and confer conference shall be attended by senior executives of the parties who have authority to settle the controversy. If not resolved at the meet-and-confer conference, the Contractor may initiate a civil action as set forth in Public Contract Code section 20104 et seq., including but not limited to compliance with applicable Government Code provisions.
(3) Time Limits Not Extended. Nothing in subdivision (a) of Public Contract Code section 20104.2 shall extend the time limit or supersede the notice requirements provided in this Contract for filing claims by the Contractor.
(b) Alternative Dispute Resolution of Claims in Excess of $375,000.00.
As a condition precedent to the initiation of litigation, disputes in excess of a total value of $375,000.00 shall first be submitted to the claims procedures set forth in Sections 4.06 and
4.07. 2.09. GUARANTEE
(a) In addition to warranties, representations and guarantees stated elsewhere in the Contract Documents, the Contractor unconditionally guarantees all materials and workmanship furnished hereunder, and agrees to replace the same at its sole cost and expense, and to the 55 Abide Builders, Inc.
CPC24-355 Westacre Park Renovation and Expansion
Project Expires: 180 Working Days
Updated 2/17/23
satisfaction of the Engineer, any and all materials which may be defective or improperly installed.
(b) The Contractor shall repair or replace to the satisfaction of the Engineer any or all such work that may prove defective in workmanship or materials, ordinary wear and tear excepted, together with any other work, which may be damaged or displaced in so doing. (c) In the event of failure to comply with the above stated conditions within a reasonable time, the City is authorized to have the defect repaired and made good at the expense of the Contractor who will pay the costs and charges therefore immediately upon demand, including any reasonable management and administrative costs, and engineering, legal and other consultant fees incurred to enforce this section. (d) The signing of the Contract by the Contractor shall constitute execution of the above guarantees. Except as otherwise provided in this Contract, the guarantees and warranties shall remain in effect for a period of one (1) year after final Acceptance of the Work by the City.
56 Abide Builders, Inc.
CPC24-355 Westacre Park Renovation and Expansion
Project Expires: 180 Working Days
Updated 2/17/23
SECTION 3
CONTROL OF WORK
3.01. AUTHORITY OF ENGINEER
(a) The Engineer is the representative of the City and has full authority to interpret the Contract Documents, to conduct the construction review and inspection of the Contractor’s performance, and to decide questions, which arise during the course of the Work and the Engineer’s decisions on these matters, shall be final and conclusive. The Engineer has the authority to reject all work and materials, which do not conform to the Contract Documents, and has the authority to stop the Work whenever such stoppage may be necessary to insure the proper execution of the Contract. The Engineer’s failure to stop the Work shall not obligate the City to accept defective or otherwise unacceptable work or otherwise affect the Engineer’s or City’s authority to reject work for any reason set forth in the Contract Documents. (b) If at any time the Contractor’s work force, tools, plant or equipment appear to the Engineer to be insufficient or inappropriate to secure the required quality of work or the proper rate of progress, the Engineer may order the Contractor to increase their efficiency, improve their character, to augment their number or to substitute other personnel, new or additional tools, plant or equipment, as the case may be, and the Contractor shall comply with such order.
Neither the failure of the Engineer to demand such increase of efficiency, number, or improvement, nor the compliance by the Contractor with the demand, shall relieve the Contractor of its obligation to provide quality work at the rate of progress necessary to complete the Work within the specified time.
(c) The Engineer may authorize minor variations in the work from the requirements of the Contract Documents which do not involve an adjustment in the Contract Price or the Contract Time. These may be accomplished by a Field Order. Contractor shall comply promptly with all Field Orders. If the Engineer and Contractor are unable to agree on entitlement or on the amount or extent, if any, of any adjustment in the Contract Price or Contract time, or cost, as a result of a Field Order, a claim may be made therefor pursuant to Section 2.07. (d) Any order given by the Engineer, not otherwise required by the Contract Documents to be in writing shall, on request of the Contractor, be given or confirmed by the Engineer in writing.
(e) Whenever work, methods of procedure, or any other matters are made subject to direction or approval, such direction or approval will be given by the Engineer.
3.02. DRAWINGS
(a) Drawings furnished herewith are for bidding purposes. The Engineer will furnish the Contractor, free of charge, copies of full size Drawings which are reasonably necessary for the execution of the Work. The Contractor shall have no claim for excusable delay on account of the failure of the Engineer to deliver such Drawings, unless the Engineer shall have failed to deliver the same within two weeks after receipt of written demand therefore from the Contractor.
The Contractor shall keep one copy of said Drawings, in good order, available to the Engineer and the Engineer’s representatives, and convenient to the working site. (b) If the Contractor, in the course of the Work, finds any discrepancy between the Drawings and the physical condition of the locality, or any errors or omissions in the Drawings, 57 Abide Builders, Inc.
CPC24-355 Westacre Park Renovation and Expansion
Project Expires: 180 Working Days
Updated 2/17/23
or in the layout as given by points and instructions, it shall be the Contractor’s duty to inform the Engineer in writing, and the Engineer will promptly verify the same.
Any work done after such discovery, until authorized, will be done at the Contractor’s risk. All Drawings, Specifications, and copies thereof furnished by the Engineer are the property of the Engineer and shall not be reused on other work and, with the exception of the signed Contract sets, are to be returned to the Engineer, on request, at the completion of the Work. All models are the property of the City.
(c) The Drawings shall be supplemented by such Shop Drawings prepared by the fabricator and/or supplier and Working Drawings prepared by the Contractor as are necessary to adequately control the Work. No changes shall be made by the Contractor in any Shop or Working Drawings after they have been reviewed by the Engineer, if the Engineer deems that no further submittals are necessary. The Contractor shall not commence the layout, purchase, fabrication, or construction of any work for which Shop or Working Drawings are required until Engineer has reviewed the specifications and drawings and has indicated in writing no further submittals are required for compliance with the Contract Documents. (d) Shop and Working Drawings for any structure shall include, but not be limited to, detail design calculations, fabrication and installation drawings, lists, graphs, operating instructions, etc., which shall be reviewed and accepted by the Engineer before any such work is performed.
(e) Shop and Working Drawings will be required for cribs, cofferdams, falsework, centering and form work and for other temporary work and methods of construction the Contractor proposes to use. Such Drawings shall be subject to the review and Acceptance of the Engineer insofar as the details affect the character of the finished work, but details of design will be left to the Contractor who shall be responsible for the successful construction of the Work.
(f) Contractor agrees that Shop and/or Working Drawings processed by the Engineer are not Change Orders; that the purpose of these Drawings submitted by the Contractor is to demonstrate to the Engineer that the Contractor understands the design concept, that the Contractor demonstrates its understanding by indicating which equipment and material the Contractor intends to furnish and by detailing the fabrication methods it intends to use. It is expressly understood, however, that favorable review of the Contractor’s Shop and Working Drawings shall not relieve the Contractor of any responsibility for accuracy of dimensions and details, or for mutual agreements of dimensions and details. It is mutually agreed that the Contractor shall be responsible for agreement and conformity of its Drawings with the Specifications. Contractor further agrees that if deviations, discrepancies or conflicts between Shop and/or Working Drawings and Specifications are discovered either prior to or after the Drawings are processed by the Engineer, the Specifications shall control and shall be followed.
(g) Unless otherwise stated, the Engineer shall have thirty (30) days from the date of receipt of Shop and/or Working Drawings for review.
(h) Full compensation for furnishing all Shop and/or Working Drawings shall be considered as included in the prices paid for the Contract items of work to which such drawings relate and no additional compensation will be allowed therefore. Any cost related to the Engineer’s review of any particular set of Shop and/or Working Drawings more than twice, due 58 Abide Builders, Inc.
CPC24-355 Westacre Park Renovation and Expansion
Project Expires: 180 Working Days
Updated 2/17/23
to incompleteness or unacceptability, shall be borne by the Contractor, and the City reserves the right to withhold such costs from payments due the Contractor. (i) All reasonable effort has been made to locate and delineate all known structures and facilities on the plans. Except as otherwise provided herein, the City of West Sacramento shall assume no responsibility for the completeness or accuracy of its delineation of underground utilities nor the existence of other buried objects which may be encountered, or which are not shown on the plans.
(j) The Contractor shall keep and maintain a clean set of plans for the project and shall record in red ink all changes, revisions, etc. made during the course of construction. These plans shall include all changes, revisions, etc. from the original plan complete with the exact sizes, locations, dimensions, elevations, etc. These plans shall be kept and maintained in a neat, clean and legible condition and shall be available for inspection at all times by the Engineer. The Contractor shall deliver these completed plans to the Engineer and the Engineer shall approve these plans prior to final Acceptance of the project by the City.
3.03. CONSTRUCTION STAKING AND SURVEYS
The City will provide one set of construction stakes and benchmarks as it deems necessary to establish lines and grades required for the completion of the site work specified in the Contract. The Contractor shall notify the Engineer a minimum of seven (7) days in advance of the time work is to begin on any portion of the project that may require construction staking to be provided by the City. The Contractor shall make all other surveys necessary for the completion of the Work.
Alternatively, the Engineer may provide the Contractor with drawings showing benchmarks and reference points as it deems necessary to establish lines and grades required for the completion of the site work specified in the Contract Documents. The Contractor shall make or furnish all surveys and set all construction stakes necessary for the completion of the work.
Stakes and marks set by the City or Engineer shall be carefully preserved by the Contractor. The Contractor shall be charged for the cost of replacing or restoring the stakes and marks, which are destroyed or damaged by Contractor’s operation. This charge will be deducted from any monies due or to become due to the Contractor under the Contract.
3.04. PERMITS AND REGULATIONS
Permits and licenses, of a temporary nature, necessary for the prosecution of the Work shall be secured and paid for by the Contractor. Permits, licenses and easements for permanent structures or permanent changes in existing facilities shall be secured and paid for by the City unless otherwise specified.
The Contractor shall give all notices and comply with all laws, ordinances, rules and regulations bearing on the conduct of the Work as shown on the plans and described in the Specifications. Contractor shall promptly notify the Engineer in writing of any specification at variance therewith. In such instances, any necessary changes shall be adjusted as provided in the Contract for changes in the Work. If the Contractor performs any Work knowing it to be contrary to such laws, ordinances, rules, and regulations and without such notice to the Engineer, Contractor shall bear all costs arising therefrom. 59 Abide Builders, Inc.
CPC24-355 Westacre Park Renovation and Expansion
Project Expires: 180 Working Days
Updated 2/17/23
3.05. CONFORMITY WITH CONTRACT DOCUMENTS AND ALLOWABLE DEVIATIONS Work and materials shall conform to the lines, grades, cross sections, dimensions and material requirements, including tolerances, shown on Contract Documents. Although measurement, sampling, and testing may be considered evidence as to such conformity, the Engineer shall be the sole judge as to whether the Work or materials deviate from the Contract Documents. The Engineer’s decision as to any allowable deviations therefrom shall be final and conclusive.
3.06. COORDINATION AND INTERPRETATION OF CONTRACT DOCUMENTS (a) Should it appear that the Work to be done or any of the matters relative thereto are not sufficiently detailed or explained in the Specifications and Plans, the Contractor shall apply to the Engineer for such further explanations as may be necessary and shall conform to them as part of the Contract. In the event of any doubt or question arising respecting the true meaning of the Specifications and Plans, reference shall be made to the Engineer, whose decision thereon shall be final and conclusive.
(b) Any reference made in the Specifications and Plans to any specification, standard, method, or publication of any scientific or technical society or other organization shall, in the absence of a specific designation to the contrary, be understood to refer to the specification, standard, method, or publication in effect as of the date that the Work is advertised for Bids.
3.07. SUBCONTRACTORS
(a) The attention of the Contractor is directed to the provisions of California Public Contract Code sections 4100-4113 regarding subcontracting and said provisions are by this reference incorporated herein and made a part hereof.
(b) Each subcontract shall contain a suitable provision for the suspension or termination thereof should the Work be suspended or terminated or should the Subcontractor neglect or fail to conform to every provision of the Contract Documents insofar as such provisions are relevant. The Contractor shall be fully responsible to the City for the acts or omissions of the Contractor’s Subcontractors and of the persons either directly or indirectly employed by the Contractor. Nothing contained in the Contract Documents shall create any contractual relationship between any Subcontractor and the City. If a legal action, including arbitration and litigation, against the City is initiated by a Subcontractor or Supplier, the Contractor shall reimburse the City for the amount of legal, engineering and all other expenses incurred by the City in defending itself in said action. (c) The City and the Engineer reserve the right to approve all Subcontractors.
Such approval shall be a consideration to the awarding of the Contract and unless notification to the contrary is given to the Contractor prior to the signing of the Contract, the list of Subcontractors which is submitted with the Contractor’s proposal will be deemed to be acceptable. Contractor shall not, without the written consent of the City, subcontract the whole of the Work.
3.08. COOPERATION OF CONTRACTORS
60 Abide Builders, Inc.
CPC24-355 Westacre Park Renovation and Expansion
Project Expires: 180 Working Days
Updated 2/17/23
(a) Should construction be under way by other forces or by other contractors within or adjacent to the limits of the Work specified or should work of any other nature be under way by other forces within or adjacent to said limits, the Contractor shall cooperate with all such other contractors or other forces to the end that any delay or hindrance to their work will be avoided. The right is reserve d to perform other or additional work at or near the site (including material sources) at any time, by the use of other forces. (b) When two or more contractors are employed on related or adjacent work, each shall conduct its operation in such a manner as not to cause any unnecessary delay or hindrance to the other. Each Contractor shall be responsible to the other for all damage to work, to persons or property caused to the other by its operations, and for loss caused the other due to unnecessary delays or failure to finish the work within the time specified for completion.
3.09. SUPERINTENDENCE
(a) The Contractor shall designate in writing, before starting work, an individual as authorized representative who shall have the authority to represent and act for the Contractor.
This authorized representative shall be present at the Site of the Work at all times while work is actually in progress on the Contract. When the Work is not in progress and during periods when the Work is suspended, arrangements acceptable to the Engineer shall be made for any emergency work, which may be required.
(b) The Contractor is solely responsible, at all times, for the superintendence of the Work and for its safety and progress.
(c) Whenever the Contractor or its authorized representative is not present on any particular part of the Work where it may be desired to give direction, orders will be given by the Engineer, which shall be received and obeyed by the superintendent or foreman who may have charge of the particular work in reference to which the orders are given. (d) Any order given by the Engineer, not otherwise required by the Specifications to be in writing, will on request of the Contractor, be given or confirmed by the Engineer in writing.
3.10. INSPECTION OF WORK
(a) Unless otherwise provided, all equipment, materials, and work shall be subject to inspection and testing by the Engineer. The Engineer will observe the progress and quality of the Work and determine, in general, if the Work is proceeding in accordance with the intent of the Contract Documents. The Engineer shall not be required to make comprehensive or continuous inspections to check the quality of the Work. The Engineer shall not be responsible for construction means, methods, techniques, sequences, or procedures, or for safety precautions and programs in connection with the Work. Visits and observations made by the Engineer shall not relieve the Contractor of Contractor’s obligation to conduct comprehensive inspections of the Work and to furnish proper materials, labor, equipment and tools, and perform acceptable work, and to provide adequate safety precautions, in conformance with the intent of the Contract.
(b) Whenever the Contractor varies the period during which work is carried on each day, the Contractor shall give due notice to the Engineer so that proper inspection may be provided. Any work done in the absence of the Engineer shall be subject to rejection. Proper facilities for safe access for inspection to all parts of the Work shall at all times be maintained for the necessary use of the Engineer and other agents of the City, and agents of the federal, state, 61 Abide Builders, Inc.
CPC24-355 Westacre Park Renovation and Expansion
Project Expires: 180 Working Days
Updated 2/17/23
or local governments at all reasonable hours for inspection by such agencies to ascertain compliance with laws and regulations.
(c) One or more inspectors may be assigned to observe the Work by the Engineer and to act in matters of construction under this Contract. It is understood that inspectors shall have the power to issue instructions and make decisions within the limitations of the authority of the Engineer. Such inspection shall not relieve the Contractor of the Contractor’s obligation to conduct comprehensive inspections of the Work, to furnish proper materials, labor, equipment and tools, and perform acceptable work, and to provide adequate safety precautions in conformance with the intent of the Contract.
(d) The Engineer and the Engineer’s representatives shall at all times have access to the Work wherever it is in preparation or progress, and the Contractor shall provide safe and convenient facilities for such access and for inspection. If the Specifications, the Engineer’s instructions, laws, ordinances, or any public authority require any material, equipment or work to be specifically tested or approved, the Contractor shall give the Engineer timely notice of its readiness for inspection, and if the inspection is by an authority other than the City, of the time fixed for inspection. Inspections by the Engineer will be made promptly and, where practicable, at the source of supply.
(e) Work performed without inspection may be required to be removed and replaced under proper inspection. In such instances, the entire cost of removal and replacing, including the cost of City-furnished materials used in the Work, shall be borne by the Contractor, regardless of whether or not the Work exposed is found to be defective. Examination of questioned work, other than that installed without inspection, may be ordered by the Engineer and, if so ordered, the Work must be uncovered by the Contractor. If such work is found to be in accordance with the Contract Documents, the City will pay the cost of re-examination and replacement. If such work is found to be not in accordance with the Contract Documents, the Contractor shall pay such cost, unless the Contractor can show that the defect in the Work was caused by another Contractor , and in that event the City will pay such costs. (f) The inspection of the Work shall not relieve the Contractor of the Contractor’s obligation to fulfill the Contract as herein prescribed, or in any way alter the standard of performance provided by the Contractor, and defective work shall be made good and unusable materials may be rejected, notwithstanding that such work and materials have been previously overlooked by the Engineer and accepted or estimated for payment. If the Work or any part thereof shall be found defective, the Contractor shall, within ten (10) calendar days, make good such defect in a manner satisfactory to the Engineer. If the Contractor fails to make ordered repairs of defective work or to remove the condemned materials from the Work within ten (10) calendar days after written direction by the Engineer, the City may make the ordered repairs, or remove the condemned materials, and deduct the cost thereof from any monies due the Contractor.
(g) The Contractor shall furnish promptly, without additional charge, all facilities, labor and materials reasonably needed by the Engineer for performing all inspection and tests.
Contractor shall be charged with any additional cost of inspection when material and workmanship are not ready at the time specified by the Contractor for its inspection. (h) Where any part of the Work is being done under an encroachment permit or building permit, or is subject to federal, state, county or city codes, laws, ordinances, rules or regulations, representatives of the government agency shall have full access to the Work and shall be allowed to make any inspection or tests in accordance with such permits, codes, laws, 62 Abide Builders, Inc.
CPC24-355 Westacre Park Renovation and Expansion
Project Expires: 180 Working Days
Updated 2/17/23
ordinances, rules, or regulations. If advance notice of the readiness of the Work for inspection by the governing agency is required, the Contractor shall furnish such notice to the appropriate agency.
(i) The Engineer may inspect the production of material, or the manufacture of products at the source of supply. Plant inspection, however, will not be undertaken until the Engineer is assured of the cooperation and assistance of both the Contractor and the material producer. The Engineer or the Engineer’s authorized representative shall have free entry at all times to such parts of the plant as concerns the manufacture or production of the materials.
Adequate facilities shall be furnished free of charge to make the necessary inspection. The City assumes no obligation to inspect materials at the source of supply.
3.11. TESTS
The Contractor shall perform, at the Contractor’s own expense, all tests specified or required by the Specifications. The Engineer may perform such tests as the Engineer deems necessary to determine the quality of work or compliance with Contract Documents. The Contractor shall furnish promptly without additional charge all facilities, labor, and material reasonably required for performing safe and convenient tests as may be required by the Engineer. All tests by the Engineer will be performed in such a manner as will not unnecessarily delay the Work. The Contractor shall not be required to reimburse the City for tests performed by the City or Engineer. If samples of materials are submitted which fail to pass the specified tests, the Contractor shall pay for all subsequent tests.
3.12. REMOVAL OF REJECTED AND UNAUTHORIZED WORK AND MATERIALS (a) All work or materials, which have been rejected, shall be remedied, or removed and replaced by the Contractor in an acceptable manner and no compensation shall be allowed the Contractor for such removal, replacement, or remedial work. (b) Any work done beyond the lines and grades shown on the plans or established by the Engineer or any Extra Work done without written authority will be considered as unauthorized work and will not be paid for. Upon order of the Engineer, unauthorized work shall be remedied, removed, or replaced at the Contractor’s expense. (c) Upon failure of the Contractor to comply with any order of the Engineer made under this section, the City may cause rejected or unauthorized work to be remedied, removed, or replaced, and may deduct the costs therefore from any monies due or to become due the Contractor.
3.13. DEDUCTIONS FOR UNCORRECTED WORK
If the Engineer deems it inexpedient to correct work damaged or not done in accordance with the Contract, an equitable deduction from the Contract price shall be made therefore, and such sum may be withheld by the City from Contractor’s payment.
3.14. EQUIPMENT AND PLANTS
(a) Only equipment and plants suitable to produce the quality of work and materials required will be permitted to operate on the Project.
63 Abide Builders, Inc.
CPC24-355 Westacre Park Renovation and Expansion
Project Expires: 180 Working Days
Updated 2/17/23
(b) Plants will be designed and constructed in accordance with general practice for such equipment and shall be of sufficient capacity to insure the production of sufficient material to carry the Work to completion within the time limit.
(c) The Contractor shall provide adequate and suitable equipment and plants to meet the above requirements, and when ordered by the Engineer, shall remove unsuitable equipment from the Work and discontinue the operation of unsatisfactory plants. Contractor shall, upon request of the Engineer, submit one or more lists identifying, by make, model number, Contractor ‘s identification number and empty gross weight, each piece of operable equipment used for the Work. Contractor shall, upon request of the Engineer, submit documentation establishing that any measuring device used for the Work has been tested and properly approved under California Test 109.
(d) In the case of termination of this Contract before its completion for any cause whatsoever, the Contractor, if notified to do so by the City, shall promptly remove any part or all of its equipment and supplies from the property of the City. If the Contractor fails to do so, the City shall have the right to remove such equipment and supplies at the expense of the Contractor.
3.15. CHARACTER OF WORKER
If any Subcontractor, or person employed by the Contractor or any Subcontractor fails or refuses to carry out the directions of the Engineer or appears to the Engineer to be incompetent or to act in a disorderly or improper manner, said person shall be removed from the Project immediately on the requisition of the Engineer. That person shall not again be employed on the Work. Such discharge shall not be the basis for any claim for compensation or damages against the City, or any of its officers or agents.
3.16. SEPARATE CONTRACTS
(a) The City reserves the right to let other contracts in connection with this Work.
The Contractor shall afford other contractors reasonable opportunity for the introduction and storage of their materials and the execution of their work, and shall properly connect and coordinate Contractor’s work with the other Contractor ‘s work. (b) If any part of the Contractor’s work depends on proper execution or results upon the Work of any other Contractor , the Contractor shall inspect and promptly report to the Engineer any defects in such work that render it unsuitable for such proper execution and results. The Contractor’s failure to inspect and report shall constitute an Acceptance of the other Contractor ‘s work as fit and proper for the reception of the Contractor’s work, except as to defects which may develop in the other Contractor ‘s work after the execution of the Contractor’s work.
(c) To insure the proper execution of Contractor’s subsequent work, the Contractor shall measure work already in place and shall at once report to the Engineer any discrepancy between the executed work and the Drawings.
3.17. ASSIGNMENT
The Contractor shall not assign the Contract or sublet it as a whole or in part without the written consent of the City, nor shall the Contractor assign any monies due, or to become due to the Contractor hereafter without the prior written consent of the City. 64 Abide Builders, Inc.
CPC24-355 Westacre Park Renovation and Expansion
Project Expires: 180 Working Days
Updated 2/17/23
3.18. USE OF COMPLETED PORTIONS, RIGHT TO OPERATE UNSATISFACTORY
EQUIPMENT OR FACILITIES
(a) The City may, at any time, and from time to time, during the performance of the Work, enter the Work Site for the purpose of installing any necessary work by City labor or other contracts, and for other purpose in connection with the installation of facilities. In doing so, the City shall endeavor not to interfere with the Contractor and the Contractor shall not interfere with other work being done by or on behalf of the City.
(b) If, prior to completion and final Acceptance of all the Work, the City takes possession of any structure or facility (whether completed or otherwise) comprising a portion of the Work with the intent to retain possession thereof (as distinguished from temporary possession contemplating the return to the Contractor), then, while the City is in possession of the same, the Contractor shall be relieved of liability for loss or damage to such structure other than that resulting from the Contractor’s fault or negligence. Such taking of possession by the City shall not relieve the Contractor from any provisions of this Contract regarding such structure, other than to the extent specified in the preceding sentence, nor shall such taking constitute a final Acceptance of such structure or facility. (c) If, following installation of any equipment or facilities furnished by the Contractor, defects requiring correction by the Contractor are found, the City shall have the right to operate such unsatisfactory equipment or facilities and make reasonable use thereof until the equipment or facilities can be shut down for correction of defects without injury to the City.
3.19. LANDS FOR WORK, RIGHT-OF-WAY CONSTRUCTION ROADS
(a) The City will provide the lands, easements, right-of-way, and/or encroachment permits necessary or other rights to enter and work on lands necessary for the performance of the Work. Other permits and licenses are addressed by Section 3.04. Should the Contractor find it advantageous to use any additional land for any purpose whatever, the Contractor shall provide for the use of such land at its expense. The Engineer shall be furnished with a copy of written agreements or otherwise be notified in writing of additional working space which is acquired. Nothing herein contained and nothing marked on the Plans shall be interpreted as giving the Contractor exclusive occupancy of the territory provided by the City. When two or more contracts are being executed at one time on the same or adjacent land in such a manner that work on one contract may interfere with that on another, the Engineer shall decide which Contractor shall cease work, and which shall continue, or whether the work on both contracts shall progress at the same time and in what manner, and the decision of the Engineer shall be final and binding. When the territory of one contract is the necessary or convenient means of access for the performance of another contract, such privilege of access or any other reasonable privilege may be granted by the Engineer to the Contractor so desiring, to the extent, amount, in the manner, and at the time permitted. No such decision as to the method or time of conducting the Work or the use of territory shall be the basis of any claim for delay or damage.
(b) Lands, easements or rights-of-way to be furnished by the City for construction operations will be specifically shown on the Plans.
(c) The Contractor shall construct and maintain all roads necessary to reach the various parts of the Work and for the transportation thereto of construction material and personnel. The cost of constructing and maintaining such roads shall be borne by the Contractor.
65 Abide Builders, Inc.
CPC24-355 Westacre Park Renovation and Expansion
Project Expires: 180 Working Days
Updated 2/17/23
3.20. CITY’S RIGHT TO AUDIT AND PRESERVATION OF RECORDS (a) The Contractor shall maintain books, records and accounts of all costs in accordance with generally accepted accounting principles and practices. The City and its authorized representatives shall have the right to audit the books, records and accounts of the Contractor under any of the following conditions:
(1) The Contract is terminated for any reason in accordance with the provisions of the Contract Documents in order to arrive at equitable termination costs; (2) In the event of a disagreement between the Contractor and the City over the amount due the Contractor under the terms of the Contract; (3) To check or substantiate any amounts invoiced or paid which are required to reflect the costs of the Contractor, or the Contractor’s efficiency or effectiveness under this Contract or in connection with extras, changes, claims, additions, backcharges, or others, as may be provided for in this Contract;
(4) If it becomes necessary to determine the City’s rights and the Contractor’s obligations under the Contract or to ascertain facts relative to any claim against the Contractor which may result in a charge against the City; (5) To determine any difference in cost occasioned by a permissible substitution;
(6) And/or for any other reason in the City’s sole judgment. (b) Contractor shall provide the City (or its representatives), unlimited, reasonable access during working hours to the Contractor’s books and records. The City’s audit rights shall be liberally construed in the City’s favor.
(c) The Contractor, from the effective date of final payment or termination hereunder, shall preserve and make available to the City for a period of three (3) years thereafter, at all reasonable times at the office of the Contractor (but without any charge to the City), all its books, records, documents, photographs, micro-photographs, and other evidence bearing on the costs and expenses of the Contractor under this Contract and relating to the Work hereunder.
(d) The City will make all payments required of it under this Contract subject to audit, under circumstances stated above, which audit may be performed at the City’s option, either during the Contract time period or during the record retention time period. Regardless of authorization, approval or acceptance, signatures or letters which are given by the City and are part of the City’s control systems or are requested by the Contractor, the payments made under this Contract shall not constitute a waiver or agreement by the City that it accepts as correct the billings, invoices or other charges on which the payments are based. If the City’s audit produces a claim against the Contractor, the City may pursue all its legal remedies even though it has made all or part of the payments required by this Contract. (e) If any audit by the City or its representative discloses an underpayment by the City pursuant to the terms of the Contract Documents, the City shall have the duty to pay any amount found by the audit to be owed to the Contractor. If such audit discloses an overpayment, the Contractor shall have the obligation to reimburse the City for the amount of the 66 Abide Builders, Inc.
CPC24-355 Westacre Park Renovation and Expansion
Project Expires: 180 Working Days
Updated 2/17/23
overpayment. The City’s right to claim reimbursement from the Contractor of any overpayment shall not be terminated or waived until three years after the completion of the City’s audit or upon the termination of audit rights under subparagraph 3.20(f), whichever date is later. The obligation of the Contractor to make reimbursements hereunder shall not terminate except as provided by law.
(f) The City’s right to audit and the preservation of records shall terminate at the end of three (3) years after the date final payment is made or termination of the Contract. The Contractor shall include this “Right to Audit and Preservation of Records” clause in all subcontracts issued by it and it shall require the same to be inserted by all lower tier Subcontractors in their subcontracts, for any portion of the work. Should Contractor fail to include this clause in any such contract or lower tier contract, or otherwise fail to insure the City’s rights hereunder, Contractor shall be liable to the City for all costs, expenses and attorney’s fees which the City may have to incur obtaining or attempting to obtain an audit or inspection of or the restoration of records which otherwise would have been available to the City from said persons under this clause. Such audit may be conducted by the City or its authorized representative.
67 Abide Builders, Inc.
CPC24-355 Westacre Park Renovation and Expansion
Project Expires: 180 Working Days
Updated 2/17/23
SECTION 4
CONTROL OF MATERIALS
4.01. MATERIALS
(a) Unless otherwise specifically stated in the Specifications, the Contractor shall furnish all materials necessary for the execution and completion of the Work. Unless otherwise specified, all materials shall be new and shall be manufactured, handled, and installed in a workmanlike manner to insure completion of the Work in accordance with the Contract Documents. The Contractor shall, upon request of the Engineer, furnish satisfactory evidence as to the kind and quality of materials.
(b) Where materials are to be furnished by the City, the type, size, quantity and location at which they are available will be stated in the Contract Documents. (c) Manufacturers’ warranties, guarantees, instruction sheets and parts listed, which are furnished with certain articles or materials incorporated in the Work, shall be delivered to the Engineer before Acceptance of the Contract.
4.02. STORAGE OF MATERIALS
Articles or materials to be incorporated in the Work shall be stored in such a manner as to insure the preservation of their quality and fitness for the Work, and to facilitate inspection.
4.03. TRADE NAMES AND ALTERNATIVES
Whenever a material, article, system or sub-system is specified or described by using the name and/or model of a proprietary product or trademark or the name of the manufacturer or vendor, the specified item shall establish the type, function, and quality required. It shall be understood that the words “or approved equivalent” are implied whether or not they follow the proprietary enumeration.
The City reserves the right to determine when proprietary items have no equivalency, and when uniformity of operations, interchangeability of parts, standard parts inventory, etc., are in the City’s best interest.
Requests for review of equivalency will be considered upon submission of sufficient information as described herein, to allow complete review. Such requests shall not be accepted from anyone other than the Contractor. Such submission must be made prior to purchase, fabrication, manufacture or use of the equivalent items under consideration. (a) Contractor’s Risk. If the Contractor includes in its Bid or later proposes any material, product or equipment that the Contractor considers equivalent to that specified, the Contractor assumes all risk of any sort associated with Acceptance or rejection of proposed equivalent items. The Contractor shall have no right to make claim based upon Contractor’s Bid that includes a proposed equivalent item(s) of work which resulted in a lower Bid amount for said item(s) or lower total bid.
(b) Submission Requirements. Each submission for equivalency review shall include:
68 Abide Builders, Inc.
CPC24-355 Westacre Park Renovation and Expansion
Project Expires: 180 Working Days
Updated 2/17/23
(1) Justification for use of the proposed equivalent item(s), including evidence, as applicable, that Contract specified material, product or equipment is unobtainable or unobtainable within an acceptable time for contract completion; (2) A description of the difference between specified item(s) and proposed equivalent item(s) and the comparative advantages and disadvantages of each; (3) All relevant data addressing each specified parameter to show equivalency;
(4) A prediction of any effects the proposed change will have on operation and maintenance costs where applicable.
(c) Equivalency. An item will be considered equivalent to the item specified if it is equal to or better in:
(1) Design and strength in all sub-parts, quality, reliability and durability, operation, maintenance and serviceability, as applicable; and (2) Specified parameters in performance in all respects for the specific function(s) indicated in the contract.
(d) Supplemental Requirements. Any tests required by the City to establish quality and performance standards shall be promptly conducted by or through the Contractor at no additional cost to the City. In addition, the Contractor shall:
(1) Submit any additional data requested by the Engineer for the equivalency review; and
(2) Satisfactorily accomplish all changes, including any Engineering associated with use of equivalent items, at no additional cost to the City. (e) Equivalency Determinations. The Engineer shall be the sole judge as to equivalency determinations. The Engineer’s decision shall be final. The Contractor shall have no right of appeal to any decision rejecting the equivalency of any item. (f) Procedure.
(1) Data substantiating a request for a substitution of “an equal” item shall be submitted prior to the Award of the Contract pursuant to Section 3400 of the latest edition of the Public Contract Code.
(2) After the Bid opening, the apparent three low bidders shall have seven (7) calendar days to provide complete substantiating data for all product, material or system substitution requests. After this seven (7)-day period, the City may award the Contract to the apparent low bidder. In no event will product, material or system substitution requests submitted after the Award of Contract be considered. Failure to submit such substantiating data will result in the automatic rejection of the proposed substitution request. The City will have thirty (30) days to review the first ten (10) proposed substitution requests. For each additional five (5) product, material or system substitution requests over and above the initial ten (10), the City will have ten (10) additional days to review the proposed substitution requests. 69 Abide Builders, Inc.
CPC24-355 Westacre Park Renovation and Expansion
Project Expires: 180 Working Days
Updated 2/17/23
(3) Each substitution request may include one alternate substitution. All alternate substitutions shall be submitted concurrently with substitution requests. Upon review by the City, proposed substitutions shall be returned to the Bidder marked either “accepted” or “rejected”. The City shall only review alternative substitution requests if the primary substitution request is rejected. If a substitution request, and its alternative, is returned “rejected”, no further substitution requests for that product, material or system will be allowed and the Bidder will provide the specified product, material or system.
(4) If, after all substitution requests have been processed, substitution requests by the apparent low Bidder are rejected by the City, the apparent low Bidder may elect not to execute the Contract. Under no circumstances, will bidders be allowed to alter their Bid Price as originally submitted. This election shall be made in writing no later than five (5) days following the receipt of the reviewed substitution requests. An election by the Bidder not to execute the Contract will result in the forfeiture of the bidder’s Bid bond. If the apparent low Bidder elects not to continue, and the second low Bidder is awarded the Contract, the second low Bidder may then elect not to execute the Contract for the contract price shown on its Bid Form. Subsequent bidders shall have five (5) days following the receipt of the reviewed substitution requests and the Notice of Award in which to make their election. This process shall continue until one Bidder decides to continue with the Award of Contract process. (5) The City may award the Contract at any time after the time for submitting substitution requests expires pursuant to subpart (2), above. In the event the Contract is awarded prior to acceptance/rejection of substitution requests, all outstanding substitution requests shall be reviewed by the City as provided above. If the apparent low Bidder elects not to execute the Contract, the Award of Contract to the apparent low Bidder shall be rescinded and the Contract awarded to the next apparent low bidder. All bidders electing not to execute the Contract expressly agree that the City shall incur no liability for such rescissions. As provided herein, “apparent low bidder” means the lowest responsive and responsible bidder.
4.04. CERTIFICATES OF COMPLIANCE
(a) A Certificate of Compliance shall be furnished prior to the use of any materials for which the Technical Specifications require that such a certificate be furnished. In addition, when so authorized in the Specifications, the Engineer may permit the use of certain materials or assemblies prior to sampling and testing if accompanied by a Certificate of Compliance. The Certificate of Compliance shall be signed by the manufacturer of the material or the manufacturer of assembled materials and shall state that the materials involved comply in all respects with the requirements of the Contract. A Certificate of Compliance shall be furnished with each lot of material delivered to the Work and the lot so certified shall be clearly identified in the Certificate.
(b) All materials used on the basis of a Certificate of Compliance may be sampled and tested at any time. The fact that material is used on the basis of a Certificate of Compliance shall not relieve the Contractor of responsibility for incorporating material in the Work which conforms to the requirements of the Contract Documents and any such material not conforming to such requirements will be subject to rejection whether in place or not. (c) The City reserves the right to refuse to permit the use of material on the basis of a Certificate of Compliance.
(d) The form of the Certificate of Compliance and its disposition shall be as directed by the Engineer.
70 Abide Builders, Inc.
CPC24-355 Westacre Park Renovation and Expansion
Project Expires: 180 Working Days
Updated 2/17/23
SECTION 5
LEGAL RELATIONS AND RESPONSIBILITY
5.01. COMPLIANCE WITH LAWS – PERMITS, REGULATIONS, TAXES The Contractor is an independent Contractor and shall, at the Contractor’s sole cost and expense, comply with all laws, rules, ordinances and regulations of all governing bodies having jurisdiction over the Work, obtain all necessary permits and licenses therefore, pay all manufacturers’ taxes, sales taxes, use taxes, processing taxes, and all federal and state taxes, insurance and contributions for social security and unemployment which are measured by wages, salaries or any remuneration paid to Contractor’s employees, whether levied under existing or subsequently enacted laws, rules or regulations. The Contractor shall also pay all property tax assessments on materials or equipment used until Acceptance by the City. If any discrepancy or inconsistency is discovered in the Plans or Specifications, or in this Contract in relation to any such law, rule, ordinance, regulation, order or decree, the Contractor shall forthwith report the same to the Engineer in writing. The Contractor shall also protect, defend and indemnify the City, the Engineer, and all of the City’s officers, agents, and servants against any claim or liability arising from or based upon the violation of any such law, rule, ordinance, regulation, order or decree, whether by the Contractor or its employees. Particular attention is called to the following:
(a) Without limitation, materials furnished and performance by Contractor hereunder shall comply with Safety Orders of the Division of Industrial Safety, State of California, Federal Safety regulations of the Bureau of Labor, Department of Labor; and any other applicable Federal regulations.
(b) The Contractor, upon request shall furnish evidence satisfactory to the City and Engineer that any or all of the foregoing obligations have been or are being fulfilled. The Contractor warrants to the City that it is licensed by all applicable governmental bodies to perform this Contract and will remain so licensed throughout the progress of the Work, and that Contractor has, and will have, throughout the progress of the Work, the necessary experience, skill and financial resources to enable the Contractor to perform this Contract. (c) Contractor is required to insure that material safety data sheets (MSDSs) for any material requiring a material safety data sheet pursuant to any federal or state law are available in a readily accessible place on the Project premises. Contractor is also required to insure:
(1) The proper labeling of any substance brought onto the Project premise by Contractor or any Subcontractors and
(2) That the person(s) working with the material, or within the general area of the material, are appropriately informed about the hazards of the substance and follow proper handling and protection procedures.
(d) Contractor is required to comply with the provisions of California Health and Safety Code section 25249.5, et seq. (Prop. 65), which requires the posting and giving of notice to persons who may be exposed to any chemical known to the State of California to cause cancer.
71 Abide Builders, Inc.
CPC24-355 Westacre Park Renovation and Expansion
Project Expires: 180 Working Days
Updated 2/17/23
5.02. PREVAILING WAGE
(a) The Contractor shall forfeit as penalty to the City the amount specified by law for each calendar day or portion thereof for each worker (whether employed by the Contractor or any Subcontractor) paid less than the stipulated prevailing rates for any work done under the Contract in violation of the provisions of the Labor Code and in particular, Section 1775 which is incorporated herein by reference. Copies of the current schedules for prevailing wages are on file in the City’s office, and the contents of those schedules are included herein as if set forth in full.
(b) The City will not recognize any claims for additional compensation because of the payment of the wages set forth in these General Conditions. The possibility of wage increases is one of the elements to be considered by the Contractor in determining its proposal, and will not under any circumstances, other than delays caused by the City, the Engineer, or the City’s agents, be considered as the basis of a claim against the City. (c) The Contractor agrees to follow the instructions of the City’s labor compliance officer until notified otherwise in writing by the City. (d) The Director of the Department of Industrial Relations of the State of California has determined the general prevailing rate of wages of per diem wages in the locality in which the work is to be performed for each craft or type of worker needed to execute the Contract.
Copies of the applicable prevailing wage rate determinations are made available to the Contractor and Subcontractor at the Pre-Job Conference Meeting. The Contractor shall post a copy of this document at the prevailing wages at each job site, along with a CMU work place poster, printed on 8 1/2” X 11” paper or larger, in accordance with California Code of Regulations, Title 8, section 16451(d).
5.03. PREVAILING WAGE RECORDS
(a) The Work is subject to monitoring and enforcement of prevailing wage requirements by the Department of Industrial Relations (“DIR”) and the following provisions will apply:
(1) Contractor and Subcontractors shall maintain and furnish to the DIR, a certified copy of each weekly payroll (but no less often than monthly), with a statement of compliance signed under penalty of perjury. Such certified payroll reports in PDF form shall be transmitted electronically to the DIR after first registering at http://www.dir.ca.gov/PublicWorks/Certified-Payroll-Reporting.html. The provisions of Labor Code section 1776 are incorporated herein by reference.
(2) The CITY and the DIR shall review, including by way of job site inspections, and, if appropriate, audit payroll records to verify compliance with the public works requirements of the Labor Code. The DIR will notify the Contractor or Subcontractor(s), as appropriate) of any noncompliance, in order for all such Contractor or Subcontractor(s) to correct the noncompliance.
(3) The City shall withhold payments when payroll records are delinquent or inadequate.
72 Abide Builders, Inc.
CPC24-355 Westacre Park Renovation and Expansion
Project Expires: 180 Working Days
Updated 2/17/23
(4) The City shall withhold payments equal to the amount of underpayment and applicable penalties when, after investigation, it is established that underpayment has occurred.
(5) The City shall cooperate with the DIR and DLSE in any investigation of suspected violations of prevailing wage requirements.
(6) As directed by the Labor Commissioner, the City shall withhold Contract payments equal to the payments due or estimated to be due to the Contractor or Subcontractors whose payroll records are delinquent or inadequate, plus any additional amount that the Labor Commissioner has reasonable cause to believe may be needed to cover a back wage and penalty assessment against such Contractor or Subcontractors. The Contractor shall be required to withhold payments to a Subcontractor whose payroll records are delinquent or inadequate until the Labor Commissioner provides notice that the Subcontractor has cured such delinquency or deficiency.
(7) These payroll records shall be made available to the City’s representatives. These records shall be maintained during the course of the Work. The Contractor and all Subcontractors shall make the certified payroll records available for inspection by City representatives upon request and shall permit such representatives to interview employees during the work hours on the job site. (8) The Contractor shall be held entirely responsible for the prompt resolution of all non-compliances with the prevailing wage laws, including those pertaining to all Subcontractors and any lower tier Subcontractors.
(9) The Project will not be accepted as complete by the City nor final payment made until all items of non-compliance are corrected or until appropriate provision is made by depository agreement to assure the ultimate resolution and payment of any back wages that may be found due.
(b) A pre-construction conference shall be conducted before commencement of the Work with the Contractor and Subcontractors at which time the prevailing wage requirements will be reviewed and agreed to by all parties.
5.04. LABOR DISCRIMINATION
Attention is directed to Section 1735 of the Labor Code, which reads as follows: “A Contractor shall not discriminate in the employment of persons upon public works on any basis listed in subdivision (a) of Section 12940 of the Government Code, as those bases are defined in Sections 12926 and 12926.1 of the Government Code, except as otherwise provided in Section 12940 of the Government Code. Every Contractor for public works who violates this section is subject to all the penalties imposed for a violation of this chapter.”
5.05. EIGHT-HOUR DAY LIMITATION
(a) In accordance with the provisions of the Labor Code, and in particular, Sections 1810 to 1815 thereof, inclusive, eight hours labor shall constitute a day’s work, and no worker, in the employ of said Contractor, or any Subcontractor, doing or contracting to do any part of the work contemplated by this Contract, shall be required or permitted to work more than eight (8) hours in any one calendar day and forty (40) hours in any one calendar week in violation of those provisions; provided that subject to Labor Code section 1815, a worker may perform work 73 Abide Builders, Inc.
CPC24-355 Westacre Park Renovation and Expansion
Project Expires: 180 Working Days
Updated 2/17/23
in excess of either eight (8) hours per day or forty (40) hours during any one week upon compensation for all hours worked in excess of eight (8) hours per day or forty (40) hours during any one week at not less than one and one-half times the basic rate of pay. (b) The Contractor and each Subcontractor shall also keep an accurate record showing the names and actual hours worked of all workers employed by them in connection with the Work. This record shall be open at all reasonable hours to the inspection of the City, State and Federal officers and agents. It is hereby further agreed that, the Contractor shall forfeit as a penalty to the City the sum of twenty-five dollars ($25.00) for each worker employed in the performance of this Contract by the Contractor or by any of its Subcontractors for each calendar day during which such worker is required or permitted to labor more than eight (8) hours in and one calendar day and forty (40) hours in any one calendar week in violation of Sections 1810 through 1815.
5.06. COMPLIANCE WITH STATE REQUIREMENTS FOR EMPLOYMENT OF
APPRENTICES
The Contractor’s attention is directed to Section 1777.5 of the Labor Code. Provisions of said section pertaining to employment of registered apprentices are hereby incorporated by reference into these Specifications. As applicable, the Contractor or any Subcontractor employed by the Contractor in the performance of the Work shall take such actions as necessary to comply with the provisions of Section 1777.5.
5.07. UNDERGROUND UTILITIES
(a) In accordance with Government Code section 4215, the Contractor shall be compensated for the costs of locating, repairing damage not due to the failure of the Contractor to exercise reasonable care, and removing or relocating existing main or trunkline utility facilities which are not indicated in the Contract Plans and Specifications with reasonable accuracy, and for the equipment on the Project necessarily idled during such work, provided that the Contractor shall first notify the Engineer before commencing work on locating, repairing damage to, removing or relocating such utilities. Contractor shall not be assessed liquidated damages for delays in completing the Work when such delays are due to the failure of either the City or the owner of the utility to provide for removal or relocation of such utility facilities. (b) The Contractor shall take all precautions necessary to protect the existing utilities within the project area. Any utilities damaged due to the Contractor’s negligence shall be repaired or restored to their original condition at the Contractor’s sole expense. Existing utilities shall be kept in service during the life of the Contract unless relocation, reconstruction, abandonment, or outage is specifically authorized by the Engineer. (c) The Contractor shall provide and maintain such temporary supports as may be necessary to preserve the functions of the various utility systems. No wires, conduits and/or pipes shall be removed until all services therein have been made inoperable. (d) The Contractor shall notify the Engineer and appropriate Regional Notification Center for operators of subsurface installations at least two (2) working days, but not more than fourteen (14) calendar days, prior to performing excavation or other work close to any underground pipeline, conduit, duct, wire and other structures. The Contractor shall provide updated information to the Notification Center as required and on a periodic basis. The Regional Notification Center includes but is not limited to the Underground Service Alert-Northern California (USA) at 1-800-642-2444.
74 Abide Builders, Inc.
CPC24-355 Westacre Park Renovation and Expansion
Project Expires: 180 Working Days
Updated 2/17/23
(e) The Contractor is advised that the State of California does not participate in USA.
The Contractor is required to notify Caltrans Permits Branch (916) 322-1297 for the location of State facilities.
(f) The Contractor shall not proceed with work until utility facilities involved have been located, disconnected, or otherwise adjusted by utility representatives. (g) The City Utility Maintenance Division will make repairs to all water service laterals and water mains damaged by the Contractor during the course of construction unless directed otherwise by the Engineer. Except as otherwise provided in this section, the Contractor shall be required to pay all labor, material and equipment costs incurred by the City Utilities Maintenance Division for the repairs made to damaged water service laterals and water mains.
The City will bill the Contractor for the repairs and the bills will be paid by the Contractor prior to either the next monthly progress payment or prior to the final payment, whichever comes first.
The Contractor shall provide to the Engineer proof of payment of the repair bills prior to the issuance of either the monthly progress payment or final payment. The current labor and equipment rates for the City Utility Maintenance Division will be made available to the Contractor at the preconstruction conference. The City shall have the right to deduct the total amount of any unpaid City repair bill from the money due or to become due the Contractor.
5.08. WATER POLLUTION
The Contractor shall exercise every reasonable precaution to protect streams, lakes, reservoirs, and canals from pollution with fuels, oils, bitumens, calcium chloride, and other harmful materials and shall conduct and schedule Contractor’s operations so as to avoid or minimize muddying and silting of said streams, lakes, reservoirs, and canals. Care shall be exercised to preserve vegetation beyond the limits of construction. The Contractor shall comply with Section 5650 of the California Fish and Game Code and all other applicable statutes and regulations relating to the prevention and abatement of water pollution.
5.09. PAYMENT OF TAXES
The Contract prices paid for the Work shall include full compensation for all taxes, which the Contractor is required to pay, whether imposed by federal, state, or local governments.
5.10. PERMITS AND LICENSES
The Contractor shall procure all permits and licenses, pay all charges and fees, and give all notices necessary and incident to the lawful prosecution of the work. All permits and licenses shall be obtained in sufficient time to prevent delays to the Work. The Contractor shall, at a minimum, possess and maintain the licenses and permits set forth in the Contract Provisions and shall ensure that its employees possess and maintain any certifications, licenses or permits required to perform work under this Contract, including but not limited to state certifications required by the California Department of Industrial Relations.
5.11. PATENTS
The Contractor shall assume all costs arising from the use of patented materials, equipment, devices, or processes used on or incorporated into the Work, and agrees to indemnify, defend and save harmless the City, the Engineer, and their duly authorized representatives, from all suits at law, or actions of every nature for, or on account of, the use of any patented materials, equipment, devices, or processes. 75 Abide Builders, Inc.
CPC24-355 Westacre Park Renovation and Expansion
Project Expires: 180 Working Days
Updated 2/17/23
5.12. PUBLIC CONVENIENCE
This section defines the Contractor’s responsibility with regard to convenience of the public and public traffic in connection with its operations. (a) The Contractor shall so conduct its operations as to offer the least possible obstruction and inconvenience to the public. The Contractor shall have under construction no greater length or amount of work than can be properly prosecuted with due regard to the rights of the public.
(b) Unless otherwise provided in the Contract Documents, all public traffic shall be permitted to pass through the Work with as little inconvenience and delay as possible. In order to expedite the passage of public traffic through or around the work, the Contractor shall install as appropriate signs, lights, flares, barricades, and other facilities for the sole convenience and direction of public traffic. Also, where directed by the Engineer, the Contractor shall provide and station competent flagpersons whose sole duties shall consist of directing the movement of public traffic through or around the Work. The cost of furnishing and installing such signs, lights, flares, barricades, and other facilities, and the cost of providing and stationing such flagpersons, all for the convenience and direction of public traffic, will be considered as included in the Contract price and no additional compensation will be allowed. (c) Spillage resulting from hauling operations along or across any publicly traveled way shall be removed immediately by the Contractor at its expense. (d) Construction operations shall be conducted in such a manner as to cause as little inconvenience as possible to abutting property owners.
(e) Convenient access to driveways, houses and buildings along the line of the work shall be maintained and temporary approaches to crossings or intersecting highways shall be provided and kept in good condition. When the abutting property owner’s access across the right-of-way line is to be eliminated, or to be replaced under the Contract by other access facilities, the existing access shall not be closed until the replacement access facilities are usable.
(f) Water shall be supplied if ordered by the Engineer for the alleviation or prevention of dust nuisance as provided in the Contract Documents. Any water obtained from a fire hydrant within the City of West Sacramento shall be subject to a fire hydrant permit issued by the Engineering Division of the City of West Sacramento. (g) Flagpersons and guards, while assigned to traffic control, shall perform their duties and shall be provided with the necessary equipment in accordance with the current “Instructions to Flagmen” of the California Department of Transportation. The equipment shall be furnished and kept clean and in good repair by the Contractor at its expense. (h) All traffic control shall be in accordance with California Manual on Uniform Traffic Control Devices (California MUTCD), Part 6 and this Section 5.12. (1) Traffic Control Plans. Traffic Control Plans shall be developed for the project to assure that adequate consideration is given to the safety and convenience of motorists, pedestrians, and workers during construction. The Traffic Control Plans shall include, but not be limited to, signing, pavement markings, construction scheduling, permanent barricades, methods and devices for delineation and channelization, placement and 76 Abide Builders, Inc.
CPC24-355 Westacre Park Renovation and Expansion
Project Expires: 180 Working Days
Updated 2/17/23
maintenance of devices, roadway lighting, traffic regulations, surveillance and inspection. The Traffic Control Plans shall be approved by the Engineer a minimum of two (2) working days prior to start of any work. Non-compliance with any stipulation of this section will be justification for the City to stop work.
(2) Traffic Control Devices and Procedures. Traffic control devices and procedures shall conform to the California Manual on Uniform Traffic Control Devices (California MUTCD), Part 6 and this Section 5.12. Non-compliance with any stipulation of this section will be justification for the City to stop work.
(3) Elimination of On-Street Parking. The Contractor shall place notification for the elimination of on-street parking, if required, at least forty-eight (48) hours, but not more than seventy-two (72) hours prior to the start of work. The notification shall include the Contractor’s phone number, the City of West Sacramento Community Development Department phone number (916) 617-4645, and the phrase “VEHICLES WILL BE TOWED PURSUANT TO CVC SECTION 22651 (L)”. This notice shall be affixed to a Type II barricade that is placed in the lane of the road (max. 200 ft. spacing) used for on-street parking. No other location or method of placement is acceptable. The notification shall be in a form approved by the Engineer. Non-compliance with any stipulation of this section will be justification for the City to stop work.
(4) Lane Closures. All lane closures shall be included in the Traffic Control Plans, and shall both conform to Section 5.12(h)(2) above, and be approved by the Engineer.
Total road closures will not be allowed for the Project. (5) Measurement and Payment. Unless specifically shown as an item of work on the proposal form, all traffic control shall be considered included in other items of work and no additional compensation will be made for labor, materials or equipment needed.
5.13. CONTINUOUS OPERABILITY OF FACILITIES
Absent written permission by the Engineer, the continuous operation of all existing facilities is required and shall in no way be affected by the Work.
5.14. SAFETY
(a) General
(1) The Contractor shall be solely and completely responsible for the conditions of the job Site, including safety of all persons and property during performance of the Work. This requirement shall apply continuously and not be limited to normal working hours.
Safety provisions shall conform to all applicable federal, state, and local laws, ordinances, and codes, and to the rules and regulations established by the California Division of Industrial Safety, and to other rules of law applicable to the Work. (2) The services of the Engineer in conducting construction review of the Contractor’s performance is not intended to include review of the adequacy of the Contractor’s work methods, equipment, bracing or scaffolding or safety measures, in, on, or near the construction site, and shall not be construed as supervision of the actual construction nor make the Engineer or the City responsible for providing a safe place for the performance of work by the Contractor, Subcontractors, or suppliers; or for access, visits, use work, travel or occupancy by any person.
77 Abide Builders, Inc.
CPC24-355 Westacre Park Renovation and Expansion
Project Expires: 180 Working Days
Updated 2/17/23
(3) The Contractor shall carefully instruct all personnel working in potentially hazardous work areas as to potential dangers and shall provide such necessary safety equipment and instruction as is necessary to prevent injury to personnel and damage to property. Special care shall be exercised relative to electrical work, work involving excavation and in sump pump work.
(4) All work and materials shall be in strict accordance with all applicable State, Federal and local laws, rules, regulations, and codes. (5) Nothing in this Contract is to be construed to permit work not conforming to governing law. When Contract Documents differ from governing law, the Contractor shall furnish and install the higher standards called for without extra charge. All equipment furnished shall be grounded and provided with guards and protection as required by safety codes. Where vapor-tight or explosion-proof electrical installation is required by law, this shall be provided. (6) The Contractor shall submit a safety plan and/or narrative description to the Engineer prior to commencement of the Work. This safety plan and/or narrative description shall describe all first aid, safety clothing, etc. to be used at the Project Site. (b) Shoring and Trench Safety Plan
(1) Attention is directed to Section 832 of the Civil Code of the State of California relating to lateral and subjacent support, and the Contractor shall comply with this law.
(2) In accordance with Section 6705 of the State Labor Code, the Contractor shall submit to the City specific plans to show details of provisions for worker protection from caving ground. Not less than thirty (30) days before beginning excavation for any trench or trenches five feet or more in depth required under this Contract, the Contractor shall furnish to the Engineer Working Drawings of its trench safety plan. The trench safety plan Working Drawings shall be detailed plans showing the design of shoring, bracing, sloping or other provisions to be made for worker protection from the hazard of caving ground. If such plan varies from the shoring system standards established by the Construction Safety Orders of the California Division of Industrial Safety or the Federal Safety and Health Regulations for Construction of the Occupational Safety and Health Administration, Department of Labor, the plan shall be prepared by a registered civil or structural engineer. In no event shall the Contractor use a shoring, sloping, or protective system less effective than that required by said Construction Safety Orders, or less effective than that required by said Federal Safety Standards. Submission of this plan in no way relieves the Contractor from the requirement to maintain safety in all operations performed by the Contractor or its Subcontractors.
5.15. BLASTING
Except for exceptional circumstances, blasting shall be prohibited. Accordingly, Bids should be prepared on the basis that no blasting will be permitted. Should blasting be required and expressly approved by the City, the City will issue a Change Order for blasting work.
5.16. INTOXICATING LIQUORS AND NARCOTICS
The Contractor shall not sell, permit or suffer the introduction or use of intoxicating liquors or narcotics upon or about the Site.
78 Abide Builders, Inc.
CPC24-355 Westacre Park Renovation and Expansion
Project Expires: 180 Working Days
Updated 2/17/23
5.17. PROTECTION OF PERSONS AND PROPERTY
(a) The Contractor shall take whatever precautions are necessary to prevent damage to all existing improvements, including above ground and underground utilities, trees, shrubbery that is not specifically shown to be removed, fences, signs, mailboxes, survey markers and monuments, buildings, structures, the City’s property, adjacent property, and any other improvements or facilities within or adjacent to the work. If such improvements or property are injured or damaged by reason of the Contractor’s operations, they shall be replaced or restored, at the Contractor’s expense, to a condition at least as good as the condition they were in prior to the start of the Contractor’s operations.
(b) The Contractor shall adopt all practical means to minimize interference to traffic and public inconvenience, discomfort or damage. The Contractor shall protect against injury to any pipes, conduits or other structures crossing the trenching or encountered in the Work and shall be responsible for any injury done to such pipes or structures, or damage to property resulting therefrom. The Contractor shall support or replace any such structures without delay and without any additional compensation to the entire satisfaction of the Engineer. All obstructions to traffic shall be guarded by barriers illuminated at night. The Contractor shall be responsible for all damage to persons and property directly or indirectly caused by its operations and, under all circumstances, Contractor must comply with the laws and regulations of the State of California relative to safety of persons and property and the interruption of traffic and the convenience of the public within the respective jurisdictions. (c) The Contractor is cautioned that it must replace all improvements in rights-ofway and within the public streets to a condition at least equal to what existed prior to the Contractor’s entry onto the job.
(d) Type and time of construction required at any road subject to interference by the work will be determined by those authorities responsible for maintenance of said road. It shall be the responsibility of the Contractor to determine the nature and extent of all such requirements, including provision of temporary detours as required; however, the construction right-of-way obtained by the City at affected roadways will be adequate for provision of all required detours. As required at any road crossing, the Contractor shall provide all necessary flagpersons, guardrails, barricades, signals, warning signs and lighting to provide for the safety of existing roads and detours. Immediately after the need for temporary detours ceases, or when directed, the Contractor shall remove such detours and perform all necessary cleanup work, including replacement of fences, and removal of pavement. Included shall be all necessary replacement of existing roadway appurtenances, grading work, soil stabilization and dust control measures, as required and directed.
(e) The Contractor shall examine all bridges, culverts, and other structures over which it will move its materials and equipment, and before using them, Contractor shall properly strengthen such structures where necessary. The Contractor shall be responsible for any and all injury or damage to such structures caused by reason of its operations.
5.18. RESPONSIBILITY FOR REPAIR OF FACILITIES
All public or private facilities, including but not limited to, gravel surfacing at existing canals, structures, telephone cables, roadways, curbs, gutters, parking lots, private drives, levees and embankments for creeks, ponds and reservoirs disturbed during construction of the work shall be repaired and/or replaced by the Contractor to match facilities existing prior to 79 Abide Builders, Inc.
CPC24-355 Westacre Park Renovation and Expansion
Project Expires: 180 Working Days
Updated 2/17/23
construction. In addition, the Contractor shall be responsible for any settlement damage to such facilities or adjoining areas for a period of one year after Acceptance of such required facilities.
5.19. CITY’S REPAIR
In the event the Contractor refuses or neglects to make good any loss or damage for which it is responsible under this Contract, the City may itself or by the employment of others, make good any such loss or damage, and the cost and expense of doing so, including any reasonable engineering, legal and other consultant fees, and any costs of administrative and managerial services, shall be charged to the Contractor. Such costs and expenses may be deducted by the City from claims for payment made by the Contractor for work completed or remaining to be completed.
5.20. ANTITRUST CLAIM ASSIGNMENT
In entering into a public works contract or a subcontract to supply goods, services, or materials pursuant to this contract, the Contractor and all Subcontractors shall offer and agree to assign to the City all rights, title, and interest in and to all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C. Sec. 15) or under the Cartwright Act (Chapter 2 (commencing with Section 16700) of Part 2 of Division 7 of the Business and Professions Code), arising from purchases of goods, services or materials pursuant to the public works contract or subcontract. This assignment shall be made and become effective at the time the City tenders final payment to the Contractor, without further acknowledgement by the parties.
5.21. WAIVER OF RIGHT TO RESCIND FOR MATERIAL BREACH
The Contractor agrees that it can be adequately compensated by money damages for any breach of this Contract which may be committed by the City and hereby agrees that no default, act, or omission of the City or the Engineer, shall constitute a material breach of the Contract entitling the Contractor to cancel or rescind the provisions of this Contract or (unless the City shall so consent or direct in writing) to suspend or abandon performance of all or any part of the Work. The Contractor hereby waives any and all rights and remedies to which it might otherwise be or become entitled, save only its right to money damages.
5.22. CONTRACTOR’S LICENSE NOTICE
CONTRACTORS ARE REQUIRED BY LAW TO BE LICENSED AND REGULATED BY THE CONTRACTORS’ STATE LICENSE BOARD. ANY QUESTIONS CONCERNING A CONTRACTOR MAY BE REFERRED TO:
REGISTRAR CONTRACTORS’ STATE LICENSE BOARD
9821 BUSINESS PARK DRIVE
SACRAMENTO, CALIFORNIA 95827
MAILING ADDRESS:
P.O. BOX 26000
SACRAMENTO, CALIFORNIA 95826
5.23. HISTORICAL, SCIENTIFIC AND ARCHEOLOGICAL DISCOVERIES All articles of historical or scientific value, including but not limited to coins, fossils, and articles of antiquity which may be uncovered by the Contractor during the progress of work, 80 Abide Builders, Inc.
CPC24-355 Westacre Park Renovation and Expansion
Project Expires: 180 Working Days
Updated 2/17/23
shall become City property. Such findings shall be reported immediately to the Engineer who will determine the method of removal, where necessary, and the final disposition thereof.
5.24. INSURANCE
Contractor shall procure and maintain for the duration of the contract insurance against claims for injuries to persons or damages to property, which may arise from or in connection with the performance of the Work hereunder by the Contractor, its agents, representatives, employees or Subcontractors. The cost of such insurance shall be included in the Contractor’s bid.
(a) Neither the Contractor nor any Subcontractors shall commence any work until all required insurance has been obtained at their own expense. Such insurance must have the approval of the City as to limit, form, and amount, and shall be placed with insurers with a current A. M. Best’s rating of no less than A-VII.
(b) Any insurance bearing on adequacy of performance shall be maintained after completion of the project for the full guarantee period. (c) Prior to execution of the Contract, the Contractor shall furnish the City with original endorsements effecting coverage for all policies required by the Contract. The endorsements shall be signed by a person authorized by the insurer to bind coverage on its behalf. The endorsements are to be on forms provided or approved by the City. The City may require the Contractor or any Subcontractor to furnish complete certified copies of all insurance policies affecting the coverage required by the Contract. (d) All of the Contractor’s policies shall contain an endorsement providing that written notice shall be given to the City at least sixty (60) calendar days prior to termination, cancellation, or reduction of coverage in the policy.
(e) Any policy or policies of insurance that the Contractor elects to carry as insurance against loss or damage to its construction equipment and tools shall include a provision therein providing a waiver of the insurer’s right to subrogation against the City and the Engineer.
(f) The requirements as to the types, limits, and the City’s approval of insurance coverage to be maintained by the Contractor are not intended to and shall not in any manner limit or qualify the liabilities and obligations assumed by the Contractor under the Contract. (g) In addition to any other remedy the City may have, if the Contractor or any of the Subcontractors fails to maintain the insurance coverage as required in this section, the City may obtain such insurance coverage as is not being maintained, in form and amount substantially the same as required herein, and the City may deduct the cost of such insurance from any amounts due or which may become due the Contractor under this Contract. (h) The Contractor and all Subcontractors shall, at their expense, maintain in effect at all times during the performance of work under the Contract not less than the following coverage and limits of insurance, which shall be maintained with insurers and under forms of policy satisfactory to the City. The maintenance by the Contractor and all Subcontractors of the following coverage and limits of insurance is a material element of this Contract. The failure of the Contractor or any Subcontractor to maintain or renew coverage or to provide evidence of renewal may be treated by the City as a material breach of this contract. 81 Abide Builders, Inc.
CPC24-355 Westacre Park Renovation and Expansion
Project Expires: 180 Working Days
Updated 2/17/23
(1) Workers’ Compensation and Employer’s Liability Insurance (i) Workers’ Compensation
The Contractor and all Subcontractors shall maintain insurance to protect the Contractor or Subcontractor from all claims under Workers’ Compensation and Employer’s Liability Acts, including Longshoremen’s and Harbor Workers’ Act. Such coverage shall be maintained, in type and amount, in strict compliance with all applicable State and Federal statutes and regulations. The Contractor shall execute a certificate in compliance with Labor Code section 1861, on the form provided in the Contract Documents. (ii) Claims Against City
If an injury occurs to any employee of the Contractor or any of the Subcontractors for which the employee or its dependents, in the event of its death, may be entitled to compensation from the City under the provisions of the said Acts, or for which compensation is claimed from the City, there will be retained out of the sums due the Contractor under this Contract, an amount sufficient to cover such compensation as fixed by said Acts, until such compensation is paid or it is determined that no compensation is due. If the City is required to pay such compensation, the amount so paid will be deducted and retained from such sums due, or to become due, the Contractor.
(2) Commercial General and Automobile Liability Insurance The Contractor shall maintain in effect at all times during the performance of the work hereunder not less than the following coverage’s and limits of Commercial General and Automobile Liability insurance:
(i) Form and Amount
The insurance shall include, but shall not be limited to, protection against claims arising from death, bodily injury, personal injury, or damage to property resulting from actions, failures to act, operations or equipment of the insured, or by its employees, agents or consultants, or by anyone directly or indirectly employed by the insured. The amount of insurance coverage shall not be less than $1,000,000.00 per occurrence with an aggregate no less than two (2) times the required per occurrence limit applying to bodily injury, personal injury, and property damage, or any combination of the three. Any deductibles must be declared to and approved by the City. At the option of the City, either: the insurer shall reduce or eliminate such deductibles as respects the entity, its officers, officials, employees and volunteers; or the Contractor shall procure a bond guaranteeing payment of losses and related investigations, claim administration expenses, and defense expenses. The commercial general and automobile liability insurance coverage shall also include the following:
(ii) Additional Requirements
Provision or endorsement naming the City, the Engineer and its consultants, and each of their officers, employees, and agents, each as additional insured’s with respect to any potential liability arising out of the performance of any work under the Contract, and providing that such insurance is primary insurance as respects the interest of the City and Engineer, and its consultants, and each of their officers, employees, and agents and that any other insurance, risk pool membership, or other liability protection maintained by the City or maintained by the Engineer is excess to the insurance required hereunder, and will not be 82 Abide Builders, Inc.
CPC24-355 Westacre Park Renovation and Expansion
Project Expires: 180 Working Days
Updated 2/17/23
called upon to contribute to any loss unless and until all limits available under the Contractor ‘s and Subcontractor’s insurance policy/policies have been paid. The additional insured coverage under the Contractor’s policy shall be “primary and non-contributory” and will not seek contribution from the City’s insurance or self-insurance and shall be at least as broad as CG 20 01 04 13.
(iii) “Cross Liability” or “Severability of Interest” clause. (iv) Broad Form Property Damage, Personal Injury, Contractual Liability, Protective Liability, and Completed Operations coverage’s, and elimination of any exclusion regarding loss or damage to property caused by explosion or resulting from collapse of buildings or structures or damage to property underground, commonly referred to by insurers as the “XCU” hazards.
(v) Provision or endorsement stating that such insurance, subject to all of its other terms and conditions, applies to the liability assumed by the Contractor under the Contract, including, without limitation, that set forth in Section 4.02, Indemnity and Litigation Costs.
(vi) Provision or endorsement stating that any failure to comply with reporting or other provisions of the policies, including breaches of warranties, shall not affect coverage provided to the City, its officers, officials, employees, or volunteers. (vii) The Contractor’s insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the limits of the insurer’s liability.
(3) Builder’s Risk or Installation Floater “All-Risk” Insurance. Before commencement of the Work, the Contractor shall submit written evidence that it has obtained for the period of the Contract, Builder’s Risk “All-Risk” Completed Value Insurance and/or Inland Marine “All-Risk” Installation Floater Insurance, as may be applicable, upon the entire project which is the subject of this Contract, including completed work and work in progress. The policy or policies of insurance shall name the Contractor, City, and Engineer as insured’s as their respective interests may appear, and shall include an insurer’s waiver of subrogation rights in favor of each. Such insurance may have a deductible clause, but the amount of the deductible shall be subject to the approval of the City, except that the deductible on earthquake coverage may be in accordance with the underwriter’s requirements.
5.25. INDEMNITY AND LITIGATION COST
(a) Promptly upon execution of the Contract, the Contractor specifically obligates itself and hereby agrees to protect, hold free and harmless, defend and indemnify the City, the Engineer and its consultants, and each of their officers, employees and agents, from any and all liability, penalties, costs, losses, damages, expenses, causes of action, claims or judgments, including attorney’s fees, which arise out of or are in any way connected with the Contractor’s, or its Subcontractors’ or suppliers’, performance of work under this Contract or failure to comply with any of the obligations contained in the Contract. This indemnity shall imply no reciprocal right of the Contractor in any action on the contract pursuant to California Civil Code section 1717 or section 1717.5. To the fullest extent legally permissible, this indemnity, defense and hold harmless agreement by the Contractor shall apply to any and all acts or omissions, whether active or passive, on the part of the Contractor or its agents, employees, representatives, or Subcontractor’s agents, employees and representatives, resulting in claim or 83 Abide Builders, Inc.
CPC24-355 Westacre Park Renovation and Expansion
Project Expires: 180 Working Days
Updated 2/17/23
liability, irrespective of whether or not any acts or omissions of the parties to be indemnified hereunder may also have been a contributing factor to the liability, except such loss or damage which was caused by the active negligence, the sole negligence, or the willful misconduct of the City. The Contractor’s obligations under this Section shall apply to claims arising from the Contractor’s mistake, error, or neglect in preparing its Bid for this project. The Contractor’s obligations under this Section shall apply to claims arising from the Contractor’s mistake, error, or neglect in preparing its Bid for this project.
(b) In any and all claims against the City, the Engineer and each of their consultants, officers, employees and agents by any employee of the Contractor, any Subcontractor, anyone directly or indirectly employed by any of them, or anyone for whose acts any of them may be liable, the indemnification obligation under this section shall not be limited in way by any limitation on the amount or type of damages, compensation or benefits payable by or for the Contractor or any Subcontractor under Workers’ Compensation statutes, disability benefit statutes or other employee benefit statutes.
5.26. PROTECTION OF WORK
(a) The Contractor shall be responsible for the care of all the Work until its completion and final acceptance. The Contractor shall, at its own expense, replace damaged or lost material and repair damaged parts of the Work or the same may be done at the Contractor’s expense by the City and the Contractor and its sureties shall be liable therefor. The Contractor shall make its own provisions for properly storing and protecting all material and equipment against theft, injury, or damage from any and all causes. Damaged material and equipment shall not be used in the Work. The Contractor shall take all risks from floods and casualties except as provided by law, and shall make no charge for the restoration of such portions of the work as may be destroyed or damaged by flood or other casualties or because of danger from flood or other casualties or for delays from such causes. The Contractor may, however, be allowed a reasonable extension of time on account of such delays, subject to the conditions herein before specified. The Contractor shall not be responsible for the cost, in excess of 5% of the contracted amount, of repairing or restoring damage to the Work, if the damage was proximately caused by an earthquake in excess of a magnitude of 3.5 on the Richter Scale or by tidal wave’ s; provided that the Work damaged was built in accordance with accepted and applicable building standards, and the plans and specifications of the City. (b) Contractor shall effectively secure and protect adjacent property and structures, livestock, crops and other vegetation. If applicable, the Contractor shall open fences on or crossing the right-of-way and install temporary gates of sound construction thereon so as to prevent the escape of livestock. Adjacent fence posts shall be adequately braced to prevent the sagging or slackening of the wire. Before such fences are opened, the Contractor shall notify the owner or tenant of the property and, where practicable, the opening of the fence shall be in accordance with the wishes of said owner or tenant. The Contractor shall be responsible that no loss or inconvenience shall accrue to the owner or tenant by virtue of their fences having been opened or the gate not having been either shut or attended at all times. Where special types of fences are encountered, the Contractor shall install temporary gates made of similar materials and of suitable quality to serve the purposes of the original fences. In all cases where the Contractor removes fences to obtain workroom, the Contractor shall provide and install temporary fencing as required, and on completion of construction shall restore the original fence to the satisfaction of the Engineer. All costs of providing, maintaining and restoring gates and fencing shall be home by the Contractor. The Contractor shall provide and maintain all passageways, guard fences, lights and other facilities for protection required by public authority or local conditions.
84 Abide Builders, Inc.
CPC24-355 Westacre Park Renovation and Expansion
Project Expires: 180 Working Days
Updated 2/17/23
(c) The Contractor shall use extreme care during construction to prevent damage from dust to crops and adjacent property. The Contractor, at its own expense, shall provide adequate dust control for the right-of-way and take other preventative measures as directed by the Engineer.
(d) The Contractor shall be responsible for all damage to any property resulting from trespass by the Contractor or its employees in the course of their employment, whether such trespass was committed with or without the consent or knowledge of the Contractor. (e) The Contractor shall see that the Site is kept drained and free of all ground water and any other water, which may impede the progress or execution of the Work. (f) The Contractor shall be responsible for any damage caused by drainage or water runoff from construction areas and from construction plant areas. (g) In an emergency affecting the safety of life, the Work, or adjoining property, the Contractor, without special instruction or authorization from the Engineer, is hereby permitted to act at its discretion to prevent such threatened loss or injury, and the Contractor shall so act without appeal if so instructed or authorized. Any compensation claimed by the Contractor on account of emergency work shall be determined as specified In Section 2.07. Should the Engineer deem an emergency condition to exist, the Contractor shall immediately do those things and take those steps ordered by the Engineer. The decision of the Engineer in this respect shall be final and conclusive. Any claims for compensation made by the Contractor on account of emergency work shall be determined as specified in Section 2.07. (h) Except as provided by Government Code section 4215, the Contractor shall be responsible for the removal, relocation and protection of all public and private utilities, including irrigation facilities in the nature of utilities, located on the site of the construction project if and to the extent that the same are identified in the Contract Documents, and the Contractor shall not be entitled to any extension of time or claim for damages for extra compensation in connection therewith. If and to the extent that such utilities or facilities are not identified in the Contract Documents, as between the Contractor and the City, the City will be responsible for the cost of their removal, relocation or protection, as the case may be, but the Contractor shall perform any such work in conformance with applicable provisions of Sections 2.06 and 2.07, if so directed by the Engineer. In such situations the Contractor shall not be responsible for delay in completion of the project caused by the failure of the City or the owner of the utility to provide for such removal or relocation. If the Contractor, while performing the Contract, discovers utility or irrigation facilities not identified by the City in the Contract Documents, the Contractor shall immediately notify the Engineer in writing.
(i) Subject to the provisions of this section, where the Work to be performed under the Contract crosses or otherwise interferes with existing streams, watercourses, canals, farm ditches, pipelines, drainage channels, or water supplies, the Contractor shall provide for such watercourse or pipelines and shall perform such construction during the progress of the Work so that no damage will result to either public or private interests, and the Contractor shall be liable for all damage that may result from failure to so provide during the progress of the Work.
5.27. ACCIDENTS
(a) The Contractor shall provide and maintain, in accordance with Labor Code section 6708 and OSHA requirements, adequate emergency first-aid treatment for its employees and anyone else who may be injured in connection with the Work. 85 Abide Builders, Inc.
CPC24-355 Westacre Park Renovation and Expansion
Project Expires: 180 Working Days
Updated 2/17/23
(b) The Contractor shall promptly report in writing to the Engineer all accidents whatsoever arising out of or in connection with, the performance of the Work, whether on or adjacent to the site, which caused death, personal injury, or property damage, giving full details and statements of witnesses. In addition, if death or serious injury or serious damage are caused, the accident shall be reported immediately by telephone or messenger to the City and the Engineer.
(c) If any claim is made by anyone against the Contractor or any Subcontractor on account of any accident, the Contractor shall promptly report the facts in writing to the Engineer, giving full details of the claim.
5.28. NO PERSONAL LIABILITY
Neither the City, the Engineer, nor any of their other officers, agents, or employees shall be personally responsible for any liability arising under the Contract, except such obligations as are specifically set forth herein.
86 Abide Builders, Inc.
CPC24-355 Westacre Park Renovation and Expansion
Project Expires: 180 Working Days
Updated 2/17/23
SECTION 6
PROGRESS AND COMPLETION OF WORK
6.01. PROGRESS SCHEDULE
The Contractor shall submit within ten (10) days after execution of the Contract a detailed work schedule(s) which shall detail the actions of the Contractor and Subcontractors working at the Site. This schedule(s) shall both show the dates at which the Contractor will start and complete and conform to the completion time specified in the Contract. The controlling operation, defined as the least float path, if any, shall be identified.
The Contractor shall review, revise and resubmit the progress schedule at least once a month to reflect progress. In any event, Contractor shall submit, at any time during the contract period, a current schedule to the Engineer at the Engineer’s request.
No progress payments will be made for any work performed until a satisfactory schedule has been submitted and approved by the Engineer. An updated schedule shall be required from the Contractor if the project falls ten (10) working days behind schedule.
If the Work falls behind the accepted schedule, the Contractor shall promptly take whatever actions are necessary to put the project back on schedule. For delays or portions of delays for which the Contractor is responsible, no payment will be made or time extension allowed for increase in work force, equipment, and working hours needed to put the project on schedule.
6.02. COMMENCEMENT AND PROGRESS OF THE WORK AND TIME OF COMPLETION (a) Commencement
The Contractor shall begin the Work after receiving a Notice to Proceed within the period of time set forth in the Contract Provisions. Thereafter, Contractor shall diligently prosecute the Work to completion as specified in the Contract Documents. The Engineer shall have the right to specify the locations where Contractor shall start and proceed with the Work.
A preconstruction conference will be convened after the Contractor has delivered the necessary bonds, insurance certificates and signed agreement in proper form as required in the invitation to bid, Bid proposal and general conditions of these specifications. Prior to any work, the Contractor shall provide the Engineer with a list of key personnel assigned to the project and the telephone numbers where they may be reached at any time. The list shall be made available in sufficient copies and presented at the preconstruction conference.
Notwithstanding any other provisions of the Contract, the City shall not be obligated to accept or pay for any work furnished by the Contractor prior to the issuance of the Notice to Proceed whether or not the City has knowledge of the furnishing of such work. The Contractor shall not commence with work on this project until its Contract bonds and evidence of insurance comply with all Contract requirements and a Notice to Proceed has been issued.
The Contractor shall notify the Engineer in writing two (2) working days (48 hours) prior to commencement of work on the Project or scheduling work for a Saturday, Sunday, or City Holiday. Failure to provide said notification will void the City’s obligation to provide inspection.
Any work done in the absence of the City’s Inspector shall be subject to rejection. 87 Abide Builders, Inc.
CPC24-355 Westacre Park Renovation and Expansion
Project Expires: 180 Working Days
Updated 2/17/23
(b) Completion
All work under this Contract shall be completed within the period of time set forth in the Contract Provisions. The Contract shall be deemed completed when the Engineer has certified the completion of the Project as provided in Section 9.07 of these General Conditions.
6.03. SUSPENSION OF WORK
(a) The Engineer may at any time, by notice in writing to the Contractor, suspend any part of the Work for such period of time as may be necessary to prevent improper execution of the Work on the project by the Contractor, its Subcontractors or agents, and the Contractor shall have no claim for damages or additional compensation on account of any such suspension.
(b) The City may at any time suspend any part or all of the Work upon ten (10) days written notice to the Contractor, who shall thereupon discontinue all work suspended except for all operations to prevent loss or damage to work already executed as may be directed by the Engineer. Work shall be resumed by the Contractor after such suspension on written notice from the City.
(c) In the event of any suspension of the Work in whole or in part under subsection (B) above, the Contractor shall be entitled to an extension of time wherein to complete the Work to the extent of the delay caused to the Contractor thereby. (d) In the event the entire work shall be suspended by order of the City, as herein above provided, and shall remain so suspended for a period of sixty (60) consecutive days, through no fault of the Contractor, and notice to resume the Work shall not have been served on the Contractor as herein above provided, Contractor may, at its option, by written notice to the City, terminate the Contract in the same manner as if the termination had been initiated by the City, and the City shall have no claim for damages because of such termination of the Contract.
6.04. DELAY IN THE WORK – TIME EXTENSIONS
The Contractor shall at all times employ such force, plant, materials, and tools as will be sufficient, in the opinion of the Engineer, to prosecute the Work at not less than the rates fixed under the terms of the Contract and to complete the Work thereof within the time limits fixed therein. If the Contractor refuses or fails to prosecute the Work, or any separable part thereof, with such diligence as will ensure the completion within the time specified in the Contract, or any extension thereof, or fails to complete said work within such time, the City may exercise the termination provisions set forth in Section 6.05, below. (a) Excusable Delays. Excusable delays shall be delays in the controlling operation of the Contractor’s work due to strikes, lockouts by others, fire, unusual delay in transportation, unavoidable casualties, adverse weather conditions which could not have been reasonably anticipated, or any other act(s) of God beyond the Contractor’s control, or by delay authorized by the City, or by any cause which the City shall decide to justify the delay. Except as provided in Section 6.04(f), below, in the event of an excusable delay, the time of completion shall be extended for such reasonable time as the City may decide. The Contractor’s right to an extension of time for an excusable delay is expressly subject to Contractor’s giving written notice of such claim within ten (10) days following the date the Contractor knew or should have known of the delay. Failure to give such notice shall be construed as a waiver of such right. It is 88 Abide Builders, Inc.
CPC24-355 Westacre Park Renovation and Expansion
Project Expires: 180 Working Days
Updated 2/17/23
understood and agreed that extensions of time shall be the Contractor’s sole and exclusive remedy for excusable delays.
(b) Compensable delays. Compensable delays shall be delays in the controlling operating of the Contractor’s work due to acts or neglect of the City, its employees or those under it by contract or otherwise, or by changes ordered in the work. In the event of a compensable delay, the time of completion shall be extended for such reasonable time as the City may decide. In addition, the Contractor may recover its direct costs as provided in Section
6.05. The Contractor’s remedies for compensable delays are expressly subject to Contractor’s giving ten (10) days written notice of such claim from the date the Contractor knew or should have known of the delay. It is understood and agreed that the Contractor’s sole and exclusive remedies for compensable delays shall be an extension of the time and recovery of its direct costs as compensable hereunder, but only in accordance with the provisions of the Contract Documents.
(c) Contractor and City understand and agree that the Contract time for the completion of this project is a very important part of the contract. Extensions of time will only be granted as provided above when events actually cause the Contractor to be delayed in the performance of that schedule activity which is the controlling operation as of the time of the delay. When acts or omissions occur which could cause delay, Contractor will take all reasonable means in order to be able to continue to work as scheduled without any delay, or as short a delay as possible. Additionally, if inclement weather causes accumulation of standing water on the work site or other conditions which might cause delay, Contractor shall take all measures reasonably necessary to permit work to continue as quickly as possible. (d) If adverse weather conditions are the basis for a claim for additional time, such claim shall be documented by date substantiating that weather conditions were abnormal for the period of time and could not have been reasonably anticipated, and that weather conditions had an adverse effect on the scheduled construction. Adverse weather conditions shall be considered only as those conditions that exceed the average annual number of rain days and rain quantities as established by the Annual Local Climatological Summary and NOAA National Technical Memorandum NWS WR-65 (Revised) as published by the United States Government, National Weather Service, National Climate Center, Asheville, North Carolina. (e) The Engineer shall be responsible for determining when adverse weather conditions result in non-workable days. It shall be the Contractor’s duty to stay informed of such determinations by the Engineer. The Contractor may object to such adverse weather determinations by filing with the Engineer a written notice of objection. The notice of objection shall state the basis of the objection and provide supporting documentation, which substantiates that weather conditions were abnormal for the period of time and could not have been reasonably anticipated, and that weather conditions had an adverse effect on the scheduled construction. All such notices of objection shall be filed within three (3) days of the day in dispute. It is hereby agreed that the Contractor’s failure to submit a written notice of objection within three (3) days of the Engineer’s adverse weather determination shall constitute a waiver by the Contractor of all its rights to further protest, judicial or otherwise. (f) The Engineer will, within a reasonable period of time, issue a ruling on the Contractor’s notice of objection. All such rulings by the Engineer shall be final, unless the Contractor files a written protest within fifteen (15) days of the Engineer’s ruling. This protest shall clearly state the basis of the dispute. Such protest will be forwarded promptly to the City, which will issue a decision on each such protest. The City decision will be final. Pending the City decision, the Contractor shall proceed with its work in accordance with the Engineer’s ruling 89 Abide Builders, Inc.
CPC24-355 Westacre Park Renovation and Expansion
Project Expires: 180 Working Days
Updated 2/17/23
and/or instructions. It is hereby agreed that the Contractor’s failure to file a protest within fifteen days (15) of the Engineer’s ruling shall constitute a waiver by the Contractor of all its rights to further protest, judicial or otherwise.
(g) The number of days that are anticipated to be non-workable due to adverse weather conditions shall be as set forth in Section 4.0 of the Special Conditions. Days deemed non-workable by the Engineer in excess of such anticipated number shall be considered excusable delays.
(h) Unexcused delays shall be delays in the Contractor’s work due to acts or neglect of the Contractor, its employees, Subcontractors or those under it by contract or otherwise. In the event of an unexcused delay, the Contractor expressly agrees that it shall not be entitled to either an extension of time or recovery of its costs.
(i) A request for an extension of time, or the granting of an extension of time, shall not constitute a basis for any claim against the City for additional compensation or damages unless caused by the City or another Contractor employed by the City.
6.05. DAMAGES FOR DELAY
In the event of compensable delay, the City shall only be liable for idle equipment, idle workers and the necessary costs of transporting equipment. The City shall be liable to the extent that the compensable delay is concurrent with excusable delays or Contractor caused delays to the controlling operation. The allowable costs shall be as for force account work under Section 2.04 with the following exceptions:
(a) The Delay Factor in the Labor Surcharge and Equipment Rental Rules applies to each equipment rental rate;
(b) The daily number of payable hours shall equal the normal working hours during the delay, not to exceed eight (8) hours per day; and
(c) No markups will be added.
6.06. TERMINATION FOR CONVENIENCE
If at any time before completion of the Work, the City determines that it is either impossible or against the interests of the City to complete the Work, or if the Work is stopped by an injunction of a court of competent jurisdiction or by order of any competent authority, the City may, upon ten (10) days written notice to the Contractor, discontinue the Work and terminate the Contract. Upon service of such notice of termination, the Contractor shall discontinue the Work in such manner, sequence, and at such times as described below. The Contractor shall have no claim for damages for such discontinuance or termination, nor any claim for anticipated profits on the Work thus dispensed with, nor any other actually performed up to the time of discontinuance, including any Extra Work ordered by the Engineer to be done, nor for any claim for liquidated damages.
Termination of the Contract for convenience and the total compensation payable to the Contractor in the event of termination shall be governed by the following:
90 Abide Builders, Inc.
CPC24-355 Westacre Park Renovation and Expansion
Project Expires: 180 Working Days
Updated 2/17/23
(a) The Engineer will issue the Contractor a written notice signed by the Engineer, specifying that the Contract is to be terminated. Upon receipt of said written notice and, except as otherwise directed in writing by the Engineer, the Contractor shall:
(1) Stop all Work under the Contract except that specifically directed to be completed prior to Acceptance.
(2) Perform Work the Engineer deems necessary to secure the project for termination.
(3) Remove equipment from the site of the Work.
(4) Take such action as is necessary to protect materials from damage. (5) Notify all Subcontractors and suppliers that the Contract is being terminated and that their contracts or orders are not to be further performed unless otherwise authorized in writing by the Engineer.
(6) Provide the Engineer with an inventory list of all material previously produced, purchased or ordered from suppliers for use in the Work and not yet used in the Work, including its storage location, and such other information as the Engineer may request. (7) Dispose of material not yet used in the Work as directed by the Engineer.
It shall be the Contractor’s responsibility to provide the City with good title to all materials purchased by the City hereunder, including material for which partial payment has been made and with bills of sale or other documents of title for such materials.
(8) Subject to the prior written approval of the Engineer, settle all outstanding liabilities and all claims arising out of subcontracts or orders for material terminated hereunder.
To the extent directed by the Engineer, the Contractor shall assign to the City all the right, title and interest of the Contractor under subcontracts or orders for materials terminated hereunder. (9) Furnish the Engineer with the documentation required to be furnished by the Contractor under the provisions of the Contract including, on projects as to which Federal funds are involved, all documentation required under the Federal requirements included in the Contract.
(10) Take such other actions as the Engineer may direct. (b) Termination of the Contract shall not relieve the Contractor of responsibility for damage to materials except as follows:
(1) The Contractor’s responsibility for damage to materials for which partial payment has been made and for materials furnished by the City for use in the Work and unused shall terminate when the Engineer certifies that such materials have been stored in the manner and at the locations he or she has directed.
(2) The Contractor’s responsibility for damage to materials purchased by the City subsequent to the issuance of the notice that the Contract is to be terminated shall terminate when title and delivery of such materials has been taken by the City. 91 Abide Builders, Inc.
CPC24-355 Westacre Park Renovation and Expansion
Project Expires: 180 Working Days
Updated 2/17/23
(3) When the Engineer determines that the Contractor has completed the Work under the Contract directed to be completed prior to termination and such other Work as may have been ordered to secure the project for termination, he or she will recommend that the Engineer formally accept the Contract, and immediately upon and after such Acceptance by the Engineer, the Contractor will not be required to perform any further Work thereon and shall be relieved of his or her Contractual responsibilities for injury to persons or damage to property which occurs after the formal Acceptance of the project by the Engineer. (c) The total compensation to be paid to the Contractor shall be determined by the Engineer on the basis of the following:
(1) The reasonable cost to the Contractor, without profit, for all Work performed under the Contract, including mobilization, demobilization and Work done to secure the project for termination. Reasonable cost will include a reasonable allowance for project Overhead and general administrative Overhead not to exceed a total of seven (7%) percent of Direct Costs of such Work.
(2) A reasonable allowance for profit on the cost of the Work performed as determined under Section 2.04(a) above, provided the Contractor establishes to the satisfaction of the Engineer that it is reasonably probable that he or she would have made a profit had the Contract been completed and provided further, that the profit allowed shall in no event exceed four (4%) percent of said cost.
(3) The reasonable cost to the Contractor of handling material returned to the vendor, delivered to the City or otherwise disposed of as directed by the Engineer. (4) A reasonable allowance for the Contractor’s administrative costs in determining the amount payable due to termination of the Contract.
All records of the Contractor and the Subcontractors, necessary to determine compensation in accordance with this section shall be open to inspection or audit by representatives of the City at all times after issuance of the notice that the Contract is to be terminated and for a period of three (3) years, and such records shall be retained for that period.
After Termination of the Work by the Engineer, the Engineer may make payments on the basis of interim estimates pending issuance of the Final Statement, when in his or her opinion the amount thus paid, together with all amounts previously paid or allowed, will not result in total compensation in excess of that to which the Contractor will be entitled.
All payments, including payment upon the Final Statement, shall be subject to deduction for prior payments and amounts, if any, to be kept or retained under the provisions of the Contract.
(d) The provisions of this section shall be included in all subcontracts.
6.07. TERMINATION FOR DEFAULT
(a) In the event of any default by the Contractor as described below, the City may, after giving ten (10) days’ written notice to the Contractor, terminate the Contractor’s right to proceed with the Work or any part of the Work in the City’s sole discretion. Events of default include:
92 Abide Builders, Inc.
CPC24-355 Westacre Park Renovation and Expansion
Project Expires: 180 Working Days
Updated 2/17/23
(1) Failure or refusal to prosecute the Work, or any separable part thereof, with such diligence as will ensure the completion within the time specified in the Contract, or any extension thereof, or failure to complete said work within such time. (2) Filing of bankruptcy by the Contractor, or the making of a general assignment for the benefit of its creditors, or appointment of a receiver on account of Contractor’s insolvency without discharge of the receiver within ten (10) days after its appointment.
(3) Failure to make prompt payments to Subcontractors or suppliers. (4) Persistent disregard of laws, ordinances, or the instructions of the Engineer, or other substantial violation of any provision of the Contract. (b) In the event the right of the Contractor to proceed with the Work, or any portion thereof, has been terminated because of the default of the Contractor and the Contractor has been given ten (10) days’ notice to cure such fault and has not done so, the City may take over the Work and prosecute the same to completion by contract or any other method the City deems expedient, and may take possession of and utilize in completing the Work such materials, appliances, equipment and plant as may be on the site of the Work and necessary therefore. In such event, the Contractor and its sureties shall be liable for all damages including costs of managerial and administrative services, engineering, legal and other consultant fees, and liquidated damages sustained or incurred by the City. (c) Upon termination, the Contractor shall not be entitled to receive any further payment until the Work is finished. If upon completion of the Work the total cost to the City, including engineering, legal and other consultant fees, costs of managerial and administrative services, construction costs, and liquidated damages shall be less than the amount which would have been paid if the Work had been completed by the Contractor in accordance with the terms of the Contract, then the difference shall be paid to the Contractor in the same manner as the final payment under the Contract. If the total cost incurred by the City on account of termination of the Contract and subsequent completion of the Work by the City by whatever method the City may deem expedient shall exceed said amount which the Contractor would otherwise have been paid, the Contractor and its sureties shall be liable to the City for the full amount of such excess expense.
(d) The rights and remedies of the City provided in this section are in addition to any of the rights and remedies provided by the law or under this Contract.
6.08. FAILURE TO TIMELY COMPLETE THE WORK – LIQUIDATED DAMAGES (a) Liquidated Damages
(1) It is agreed by the parties to this Contract that time is of the essence. In the event all the Work is not completed before or upon the expiration of the time limit as set in the Bid, Contract and/or Progress Schedule, or within any time extensions that may have been granted, damage will be sustained by the City; and that it may be impracticable to determine the actual amount of damage by reason of such delay. Accordingly, it is agreed that the Contractor shall pay to the City as damages the amount set forth for each and every day’s delay in finishing the Work in excess of the number of days specified. Liquidated damages shall be paid at a rate of one thousand dollars ($1,000.00) per day unless otherwise stated in the Contract Documents.
The parties expressly agree that the liquidated damage clause found in the Contract Documents 93 Abide Builders, Inc.
CPC24-355 Westacre Park Renovation and Expansion
Project Expires: 180 Working Days
Updated 2/17/23
is reasonable under the circumstances existing at the time the Contract was made. The City shall have the right to deduct the amount of liquidated damages from any money due or to become due the Contractor.
(2) In addition, the City shall have the right to charge to the Contractor and to deduct from the final or progress payments for the Work the actual cost to the City of legal, engineering, inspection, superintendence, and other expenses, which are directly chargeable to the Contract and which accrue during the period of such delay, except that the cost of final inspection and preparation of the final estimate shall not be included in the charges. (b) Exclusions
Notwithstanding the provisions of Section 2.06(a), the Contractor shall not be liable for liquidated damages or delays caused by the removal or relocation of utilities when such removal or relocation is the responsibility of the City or the owner of the utility under Government Code section 4215.
6.09. CLEAN-UP
During the progress of the Work, the Contractor shall maintain the Site and related structures and equipment in a clean, orderly condition and free from unsightly accumulation of rubbish. All waste materials shall be removed daily from the Site and disposed of by the Contractor by any proper means at its own expense unless designated otherwise on the plans.
No waste materials shall be placed in the public street right-of-way. Unless otherwise specified, all existing piping, materials and/or equipment removed pursuant to this Contract shall become the Contractor’s property.
Upon completion of the Work and before the final estimate is submitted, the Contractor shall, at its own cost and expense, remove from the vicinity of the Work all plants, buildings, rubbish, unused work materials, concrete forms, and temporary bridging and other like materials, belonging to the Contractor or used under the Contractor’s direction during the construction, and in the event of the Contractor’s failure to do so, the same may be removed by the City after ten (10) calendar days’ notice to the Contractor. Such removal shall be at the expense of the Contractor.
The Contractor shall use care in the removal of materials and equipment so as not to cause damage to existing facilities and structures. Contractor shall assume liability for all such damage. Where the construction has crossed yards or driveways, restoration shall be by the Contractor to the complete satisfaction of the Engineer, at the Contractor’s expense.
The Contractor shall make its own arrangements for the disposal of waste materials. If the Contractor elects to dispose of such materials on private property, Contractor shall obtain written permission from all property owners involved.
94 Abide Builders, Inc.
CPC24-355 Westacre Park Renovation and Expansion
Project Expires: 180 Working Days
Updated 2/17/23
SECTION 7
MEASUREMENT AND PAYMENT
7.01. MEASUREMENT OF QUANTITIES
(a) Where the Contract provides for payment on a lump sum price basis, no measurement of quantity will be made. Where the Contract provides for payment on a unit price basis, the quantities of work performed will be computed by the Engineer on the basis of measurements taken by the Engineer, and these measurements shall be final and conclusive. (b) All quantities of work computed under the Contract shall be based upon measurements by the Engineer according to United States Measurements and Weights. (c) Methods of measurement are specified herein and in the Technical Specifications.
(d) Mobilization shall be measured and payment issued according to Section 11 of the State Standard Specifications.
7.02. SCOPE OF PAYMENT
(a) The Contractor shall accept the compensation provided in the Contract as full payment for furnishing all labor, materials, tools, equipment, and incidentals necessary to the completed work and for performing all work contemplated and embraced under the Contract; also for loss or damage arising from the nature of the work, or from the action of the elements, or from any unforeseen difficulties which may be encountered during the prosecution of the Work until the Acceptance by the City and for all risks of every description connected with the prosecution of the Work, also for all expenses incurred in consequence of the suspension or discontinuance of the work as provided in the Contract; and for completing the Work according to the Specifications and Plans. Neither the payment of any estimate nor of any retained percentage shall relieve the Contractor of any obligation to make good any defective work or material.
(b) No compensation will be made in any case for loss of anticipated profits.
Increased or decreased work involving supplemental agreements will be paid for as provided in such agreements.
(c) The Work includes the preparatory work and operations needed for mobilization and demobilization of the Project. The Work, however, does not include establishing the Engineer’s field facility(s) of utility work and connections needed for these facilities.
7.03. PROGRESS ESTIMATE
For each calendar month of Contract work, the Engineer will prepare a progress estimate of all work performed under the Contract. Within the first ten (10) days of each succeeding calendar month, the Engineer will prepare in writing an estimate which in the Engineer’s opinion is a fair approximation of the value of all work done under the Contract, including any amounts due the Contractor for Extra Work and Change Orders. In arriving at the value of the Work done, the Engineer will give consideration to the value of labor and materials which have been incorporated into the permanent work by the Contractor during the preceding 95 Abide Builders, Inc.
CPC24-355 Westacre Park Renovation and Expansion
Project Expires: 180 Working Days
Updated 2/17/23
month. Consideration will not be given to preparatory work done or for materials or equipment on hand.
In order to assist the Engineer, the Contractor shall furnish the Engineer with copies of invoices for all such items delivered to the job site.
7.04. PROGRESS PAYMENTS
(a) The City will pay the Contractor ninety-five percent (95%) of the amount of each progress estimate within thirty (30) days after receipt of an undisputed and properly submitted progress estimate from the Contractor, unless the City has made a finding prebid pursuant to Public Contract Code section 7201(b)(4) justifying a larger retention. If the City fails to pay an undisputed progress estimate within the allotted thirty (30) days, the City shall pay interest to the Contractor equivalent to the legal rate set forth in subdivision (A) of section 685.010 of the Code of Civil Procedure. Five percent (5%) of the amount of each estimate shall be retained by the City until final completion and Acceptance of all work under the Contract. (b) Upon receipt of a payment request, the City shall act in accordance with both of the following:
(1) Each payment request shall be reviewed by the City as soon as practicable after receipt for the purpose of determining that the progress estimate is a proper payment request.
(2) Any payment request determined not to be a proper payment request suitable for payment shall be returned to the Contractor as soon as practicable, but not later than seven (7) days, after receipt. A request returned pursuant to this section shall be accompanied by a document setting forth in writing the reasons why the payment request is not proper.
(c) The number of days available to the City to make a payment without incurring interest pursuant to this section shall be reduced by the number of days by which the City exceeds the seven-day return requirement set forth in paragraph (2) of subdivision (b). (d) The Contractor may, in accordance with the provisions of Public Contracts Code section 22300, substitute securities for any monies which the City may withhold to insure performance under the Contract.
(e) When, in the judgment of the Engineer, the Work is not proceeding in accordance with the provisions of the Contract, or when in the Engineer’s judgment the total amount of the Work done since the last estimate amounts to less than one thousand dollars ($1,000.00), no pay estimate will be prepared and no progress payment will be made. (f) No progress estimate or payment shall be considered to be an approval or Acceptance of any work, materials or equipment. Estimated amounts and values of work done and materials and equipment furnished will be conformed with actual amounts and values as they become available in subsequent progress estimates, progress payments and the final estimate and payment. All estimates and payments will be subject to correction in subsequent progress estimates and payments and the final estimate and payment. (g) It is mutually agreed between the parties to the Contract that no payments made under the Contract, including progress payments and the final payment shall be evidence of the 96 Abide Builders, Inc.
CPC24-355 Westacre Park Renovation and Expansion
Project Expires: 180 Working Days
Updated 2/17/23
performance of the Contract, either wholly or in part, and no payment shall construed to be an Acceptance of any defective or incomplete work or improper materials.
7.05. PROMPT PROGRESS PAYMENT TO SUBCONTRACTORS
A prime Contractor or Subcontractor shall pay any Subcontractor not later than seven (7) days of receipt of each progress payment in accordance with the provisions in Section 7108.5 of the California Business and Professions Code concerning prompt payment to Subcontractors. The seven (7) days is applicable unless a longer period is agreed to in writing.
Any delay or postponement of payment over 30 days may take place only for good cause and with the City’s prior written approval. Any violation of Section 7108.5 shall subject the violating Contractor or Subcontractor to the penalties, sanctions and other remedies of that section. This requirement shall not be construed to limit or impair any contractual, administrative, or judicial remedies otherwise available to the Contractor or Subcontractor in the event of a dispute involving late payment or nonpayment by the prime Contractor , deficient subcontract performance, or noncompliance by a Subcontractor. This provision applies to both DBE and non-DBE Subcontractors.
7.06. LIENS AND STOP NOTICES
The Contractor agrees to keep the Work, the site of the Work and all monies held by the City free and clear of all liens and stop notices related to labor and materials furnished in connection with the Work, if permitted by law. Furthermore, the Contractor waives any right it may have to file any type of lien or stop notice in connection with the Work. Notwithstanding anything to the contrary contained in the Contract Documents, if any such lien or stop notice is filed or there is evidence to believe that lien or stop notice may be filed at any time during the progress of the Work or within the duration of this Contract, the City may refuse to make any payment otherwise due the Contractor or may withhold any payment due the Contractor a sum sufficient in the opinion of the City to pay all obligations and expenses necessary to satisfy such lien or stop notice. The City may withhold such payment unless or until the Contractor, within ten days after demand therefor by the City, shall furnish satisfactory evidence that the indebtedness and any lien or stop notice in respect thereof has been satisfied, discharged and released of record, or that the Contractor has legally caused such lien or stop notice to be released of record pending the resolution of any dispute between the Contractor and any person or persons filing such lien or stop notice. If the Contractor shall fail to furnish such satisfactory evidence within ten days of the demand therefor, the City may discharge such indebtedness and deduct the amount thereof, together with any and all losses, costs and damages suffered or incurred by the City from any sum payable to the Contractor under the Contract Documents, including but not limited to final payment and retained percentage. This section shall be specifically included in all Subcontracts and purchase orders entered into by the Contractor.
7.07. FINAL ACCEPTANCE AND DATE OF COMPLETION
Whenever the Contractor shall deem all Work under this Contract to have been completed in accordance therewith, the Contractor shall so notify the Engineer in writing, and the Engineer shall promptly ascertain whether the Work has been satisfactorily completed and, if not, shall advise the Contractor in detail and in writing of any additional work required. When all the provisions of the Contract have been fully complied with, to the satisfaction of the Engineer, the Engineer shall proceed with all reasonable diligence to determine accurately the total value of all Work performed by the Contractor at the prices set forth in the Contract or fixed by Change Orders, and the total value of all extra work, all in accordance with the Contract.
The Engineer will then certify to said final estimate and to the completion of the Work, and will 97 Abide Builders, Inc.
CPC24-355 Westacre Park Renovation and Expansion
Project Expires: 180 Working Days
Updated 2/17/23
file copies thereof with the City and the Contractor, and shall cause of Notice of Completion to be filed with the Yolo County Clerk-Recorder . The date of completion shall be the date of filing of the Notice of Completion. All guarantees, warranties, and securities securing said guarantees and warranties, shall commence on said date.
7.08. RIGHT TO WITHHOLD PAYMENTS
(a) In addition to all other rights and remedies of the City hereunder and by virtue of the law, the City may withhold or nullify the whole or any part of any partial or final payment to such extent as may reasonably be necessary to protect the City from loss on account of:
(1) Defective work not remedied, irrespective of when any such work be found to be defective;
(2) Claims or liens filed or reasonable evidence indicating probable filing of claims or liens including, but not limited to claims under Sections 1775, 1776, or 1777.7 of the Labor Code;
(3) Failure of the Contractor to make payments properly for labor, materials, equipment, or other facilities, or to Subcontractors and/or suppliers; (4) A reasonable doubt that the Work can be completed for the balance then unearned;
(5) A reasonable doubt that the Contractor will complete the Work within the agreed time limits;
(6) Costs to the City resulting from failure of the Contractor to complete the Work within the proper time; or
(7) Damage to work or property.
(b) Whenever the City shall, in accordance herewith, withhold any monies otherwise due the Contractor, written notice of the amount withheld and the reasons therefor will be given the Contractor. After the Contractor has corrected the enumerated deficiencies, the City will promptly pay to the Contractor the amount so withheld. When monies are withheld to protect the City against claims or liens of mechanics, material men, Subcontractors, etc., the City may at its discretion permit the Contractor to deliver a surety bond in terms and amount satisfactory to the City, indemnifying the City against any loss or expense, and upon Acceptance thereof by the City, the City shall release to the Contractor monies so withheld.
7.09. FINAL PAYMENT
Within ten (10) days after the date of completion, the City will file in the Office of the County Recorder, a Notice of Completion of the Work herein agreed to be done by the Contractor. Within sixty (60) days of completion defined in Public Contract Code section 7107, the difference between said final estimate and all payments theretofore made to the Contractor shall be due and payable to the Contractor, subject to any requirements concerning the furnishings of a maintenance bond, and excepting only such sum or sums as may be withheld or deducted in accordance with the provisions of this Contract. All prior certifications upon which partial Payments may have been made, being merely estimates, shall be subject to correction in the final certificate.
98 Abide Builders, Inc.
CPC24-355 Westacre Park Renovation and Expansion
Project Expires: 180 Working Days
Updated 2/17/23
7.10. FINAL RELEASE
Final payment to the Contractor in accordance with the final estimate is contingent upon the Contractor furnishing the City with a signed written release of all claims against the City arising by virtue of the Contract. Disputed Contract claims in stated amounts may be specifically excluded by the Contractor from the operation of the release. The release shall be in substantially the form specified in California Civil Code section 8138. 99 Abide Builders, Inc.
CPC24-355 Westacre Park Renovation and Expansion
Project Expires: 180 Working Days
1795423.1 7203-038
PART 3 SUPPLEMENTAL CONDITIONS
(SPECIAL PROVISIONS)
100
Abide Builders, Inc.
CPC24-355 Westacre Park Renovation and Expansion
Project Expires: 180 Working Days
1795423.1 7203-038
SUPPLEMENTAL CONDITIONS (SPECIAL PROVISIONS)
Except as modified by these Supplemental Conditions, the work shall be performed in accordance with Part 3 General Conditions. The numbering of these Supplemental Conditions coincides to the numbering in the General Conditions. The existence of a section in these Supplemental Conditions means that a corresponding section in the General Conditions is modified in some respect. Under these contract documents, Supplemental Conditions and Special Provisions have the same meaning.
The following Supplemental Conditions , if any, shall be used in conjunction with the City of West Sacramento Standard Specifications current edition including Standard Details and all revisions, and the current State of California Department of Transportation (Caltrans) Standard Specifications, in that order.
The following provisions apply to use of or reference to the Caltrans Standard Specifications:
1. None of the “General Provisions” of the Caltrans Standard Specifications, i.e., Sections 1 through 9, applies to these Contract Documents with the exception of any specific provisions, if any, which are expressly stated to apply to these Contract Documents. The City’s “General Conditions” shall govern.
2. If there is a conflict or inconsistency between any provision in the Caltrans Standard Specifications and a provision of these Contract Documents, the provision in the Contract Documents will govern.
3. Any reference to the “Engineer” in the Caltrans Standard Specifications is deemed to mean “City”, “Owner” or “Architect/Engineer” or Owner’s designated representative.
4. Any reference to the “State” in the Caltrans Standard Specifications is deemed to mean “City” or “Owner.”
City Standard Specifications are available online at:
http://cityofwestsacramento.org/city/depts/comdev/engineering/specs/default.asp Bound hardcopies may be purchased from City Hall at:
1110 West Capitol Avenue, 2nd Floor
West Sacramento, California 95691
or by calling (916) 617-4645 for purchase by mail.
State Standard Specifications are available online at:
http://www.dot.ca.gov/hq/esc/oe/standards.php
5. This Contract is funded in whole in part through grant funds received under the following grant: Statewide Park Development and Community Revitalization Program, (the “Grant”), the terms of which are incorporated herein. Copies of the Grant and any related materials will be made available to Consultant, and Consultant shall ensure that its performance under this Contract, and that of any subcontractors, conforms to the requirements of the Grant. 101
Abide Builders, Inc.
CPC24-355 Westacre Park Renovation and Expansion
Project Expires: 180 Working Days
1795423.1 7203-038
PART 4 TECHNICAL SPECIFICATIONS
The work shall be performed in accordance with the latest edition of the City of West Sacramento Standard Specifications – Division IV: Standard Construction Specifications and Caltrans Standard Specifications 2015, except as modified by these Technical Specifications.
Section numbering of these Technical Specifications does not conform to the City’s Standard Specifications.
Contractor shall provide submittals (shop drawings) for all materials to be installed or used on the project.
[Technical Specifications]
102
TABLE OF CONTENTS
WESTACRE PARK TECHNICAL SPECIFICATIONS
100% SUBMITTAL 11-26-2024
GENERAL REQUIREMENTS
ALTERNATIVES 01230
ADMINISTRATIVE REQUIREMENTS 01300
QUALITY REQUIREMENTS 01400
TEMPORARY FACILITIES AND CONTROLS 01500
TEMPORARY UTILITIES 01510
VEHICULAR ACCESS AND PARKING 01550
EQUIPMENT PROTECTION 01570
PRODUCT REQUIREMENTS 01600
EXECUTION REQUIREMENTS 01700
CLOSEOUT PROCEDURES 01770
CLOSEOUT SUBMITTALS 01780
PROJECT RECORD DOCUMENTS 01781
OPERATIONS AND MAINTENANCE DATA 01782
SITEWORK
DEMOLITION 02100
SITE CLEARING 02230
LANDSCAPE GRADING 02260
EARTHWORK 02300
FILL AND BACKFILL 02316
TRENCHING 02324
SITE FURNISHINGS 02470
STORM DRAINAGE 02630
AGGREGATE BASE COURSE 02721
PAVEMENT JOINT SEALANTS 02764
IRRIGATION 02811
LANDSCAPE INSTALLATION 02905
LANDSCAPE MAINTENANCE 02970
CONCRETE 030000
103
TABLE OF CONTENTS
WESTACRE PARK TECHNICAL SPECIFICATIONS
100% SUBMITTAL 11-26-2024
LAYKOLD ADVANTAGE SYSTEM 080723
PLAYGROUND EQUIPMENT 116800
EXTERIOR IMPROVEMENTS LANDSCAPE MAINTENANCE 320190.13
EXTERIOR IMPROVEMENTS CONCRETE PAVING 321313
PAVEMENT MARKINGS AND SIGNS 321223
PERMEABLE DECOMPOSED GRANITE PAVING 321541
SPECTRAPOUR POURED-IN-PLACE 321816.13
CHAIN LINK FENCES AND GATES 323113
SITE FURNISHINGS AND EQUIPMENT 323300
IRRIGATION 02811
SANITARY SEWERAGE UTILITIES 333000
SITE PREPARATION 311000
SITE DRAINAGE 334000
TRENCHING 02324
FILL AND BACKFILL 02316
ASPHALT PAVING AND BASE 321216
STORMWATER AREA DRAINS AND INLETS 334231
CONCRETE PAVING 321313
SPECIALTIES
AQUATIC SPRAYGROUND 10001
SIGNS AND SIGNPOSTS 10430
WATERPLAY SPECIFICATION
SKATEPARK (ALL-WHEEL PARK) SPECIFICATIONS 030000
SECTION 03 10 00 – CONCRETE FORMING FOR SKATEPARKS
SECTION 03 20 00 – CONCRETE REINFORCING FOR SKATEPARKS
SECTION 03 30 00 – CAST-IN-PLACE CONCRETE FOR SKATEPARKS SECTION 03 37 13 – SHOTCRETE FOR SKATEPARKS
SECTION 03 39 00 – CONCRETE CURING FOR SKATEPARKS
SECTION 05 50 00 – METAL FABRICATIONS FOR SKATEPARKS
SECTION 07 92 00 – JOINT SEALANTS FOR SKATEPARKS
SECTION 31 20 00 – EARTH MOVING FOR SKATEPARKS
104
TABLE OF CONTENTS
WESTACRE PARK TECHNICAL SPECIFICATIONS
100% SUBMITTAL 11-26-2024
ELECTRICAL
ELECTRICAL GENERAL REQUIREMENTS 16050
BASIC MATERIALS AND METHODS 16100
LIGHTING 16500
LIGHTING CONTROL DEVICES 260923
LOW VOLTAGE ELECTRICAL 260519
LOW VOLTAGE TRANSFORMER 262200
105
Westacre Park Expansion and Renovation Project Section 01300 September 2024 Alternatives
01230-1
SECTION 01230
ALTERNATIVES
PART1 GENERAL
1.01 SECTION INCLUDES
A. Alternative submission procedures.
B. Documentation of changes to Contract Sum and Contract Time.
1.02 RELATED SECTIONS
A. Construction Agreement: Incorporating monetary value of accepted alternatives.
1.03 ACCEPTANCE OF ALTERNATIVES
A. Alternatives quoted on Contract Forms will be reviewed and accepted or rejected at Owner’s option. Accepted alternatives will be identified in the Owner-Contractor Agreement.
B. The Owner has the option of accepting none, or any number and combination of Bid Alternatives.
C. Alternates may be submitted during the construction process. If they are considered to be an equal product by the Owner, then they may be approved.
D. Coordinate related work and modify surrounding work to integrate the Work of each alternative.
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION - NOT USED
END OF SECTION
106
Westacre Park Expansion and Renovation Project Section 01300 September 2024 Alternatives
01230-1
SECTION 01230
ALTERNATIVES
PART1 GENERAL
1.01 SECTION INCLUDES
A. Alternative submission procedures.
B. Documentation of changes to Contract Sum and Contract Time.
1.02 RELATED SECTIONS
A. Construction Agreement: Incorporating monetary value of accepted alternatives.
1.03 ACCEPTANCE OF ALTERNATIVES
A. Alternatives quoted on Contract Forms will be reviewed and accepted or rejected at Owner’s option. Accepted alternatives will be identified in the Owner-Contractor Agreement.
B. The Owner has the option of accepting none, or any number and combination of Bid Alternatives.
C. Alternates may be submitted during the construction process. If they are considered to be an equal product by the Owner, then they may be approved.
D. Coordinate related work and modify surrounding work to integrate the Work of each alternative.
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION - NOT USED
END OF SECTION
107
Westacre Park Expansion and Renovation Project Section 01300 September 2024 Administrative Requirements
01300-1
SECTION 01300
ADMINISTRATIVE REQUIREMENTS
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Preconstruction meeting.
B. Site mobilization meeting.
C. Progress meetings.
D. Construction progress schedule.
E. Submittals for review, information, and project closeout.
F. Number of copies of submittals.
G. Submittal procedures.
1.02 RELATED SECTIONS
A. Project General Conditions.
PART 2 PRODUCTS
NOT USED
PART 3 EXECUTION
3.01 PRECONSTRUCTION MEETING
A. The Owner will schedule a meeting after Notice of Award.
B. Attendance Required:
1. The Owner
2. Landscape Architect
4. Contractor
5. Landscape Contractor
6. Sub-contractors as requested by the Owner
C. Agenda
1. Submission of list of Subcontractors, list of Products and schedule of values.
2. Designation of personnel representing the parties to Contract, The Owner, Contractor, Construction Management firm and Landscape Architect.
3. Procedures and processing of field decisions, submittals, substitutions, applications for payments, proposal request, Change Orders, and Contract closeout procedures. 108
Westacre Park Expansion and Renovation Project Section 01300 September 2024 Administrative Requirements
01300-2
4. Critical Path Scheduling.
D. The Landscape Architect will record minutes and distribute copies after meeting to participants.
3.02 SITE MOBILIZATION MEETING
A. The Landscape Architect will schedule a meeting at the Project site prior to Contractor occupancy.
B. Attendance Required:
1. Contractor
2. The Owner
3. Landscape Architect
4. Contractor's Superintendent
5. Major Subcontractors
C. Agenda:
1. Use of premises by The Owner and Contractor.
2. The Owner's requirements and occupancy prior to completion.
3. Permit requirements.
4. Construction facilities and controls provided by Owner.
5. Temporary utilities.
6. Survey and park layout.
7. Security and housekeeping procedures.
8. Critical Path Schedules.
9. Application for payment procedures.
10. Procedures for testing.
11. Procedures for maintaining record documents.
12. Requirements for start-up of equipment.
13. Inspection and acceptance of equipment put into service during construction period.
3.03 PROGRESS MEETINGS
A. Schedule and administer meetings throughout progress of the Work at maximum oneweek intervals.
B. The Owner will make arrangements for meetings, prepare agenda with copies for participants, and preside at meetings.
C. Attendance Required: Job superintendent, major Subcontractors and suppliers, the Owner and others, as appropriate to agenda topics for each meeting.
D. Agenda:
1. Review minutes of previous meetings.
109
Westacre Park Expansion and Renovation Project Section 01300 September 2024 Administrative Requirements
01300-3
2. Review of Critical Path Work progress.
3. Field observations, problems, and decisions.
4. Identification of problems that may impede planned progress.
5. Review of submittals schedule and status of submittals.
6. Review of off-site fabrication and delivery schedules.
7. Submit updated schedule and critical path items.
8. Corrective measures to regain projected schedules.
9. Planned progress during succeeding work period.
10. Maintenance of quality and work standards.
11. Effect of proposed changes on progress schedule and coordination.
12. Other business relating to Work.
E. The Architect will record minutes and distribute copies after meeting to participants.
3.04 CONSTRUCTION PROGRESS SCHEDULE
A. See Contract General Conditions for Schedules Required of Contractor B. Construction Timeline Priorities – Contract shall coordinate schedule with Owner’s prefabricated restroom contractor to have utilities stubbed out and restroom pad ready for restroom contractor to install restroom.
3.05 SUBMITTALS FOR REVIEW
A. When the following are specified in individual sections, submit them for review:
1. Product data.
2. Shop drawings.
3. Samples for selection.
4. Samples for verification.
5. Ten (10) days before scheduled work, provide mock-up samples onsite for inspection of samples over 50 pounds.
B. Submit to the Landscape Architect for the limited purpose of checking with information given and the design concept expressed in the contract documents.
C. Samples will be reviewed only for aesthetic, color, or finish selection.
D. After review, provide copies and distribute in accordance with SUBMITTAL PROCEDURES article below and for record documents purposes described in Section 01780 - CLOSEOUT SUBMITTALS.
3.06 SUBMITTALS FOR INFORMATION
A. When the following are specified in individual sections, submit them for information:
1. Design data.
110
Westacre Park Expansion and Renovation Project Section 01300 September 2024 Administrative Requirements
01300-4
2. Certificates.
3. Test reports.
4. Inspection reports.
5. Manufacturer's instructions.
6. Manufacturer's field reports.
6. Other types indicated.
B. Small size sheets, not larger than 8-1/2 x 11; submit the number of copies which the Contractor requires, plus three copies for the Owner, plus one copy for Landscape Architect.
3.07 SUBMITTALS FOR PROJECT CLOSEOUT
A. When the following are specified in individual sections, submit them at project closeout:
1. Project record documents.
2. Operation and maintenance data.
3. Warranties.
4. As-built documents.
5. Other types as indicated.
B. Submit for the Owner's benefit during and after project completion.
3.08 NUMBER OF COPIES OF SUBMITTALS
A. Documents for Review: Submit the number of copies which the Contractor requires, plus three copies for the Owner, plus one copy for the Landscape Architect.
1. Small size sheets, not larger than 8-1/2 x 11 inches: Submit the number of copies the Contractor requires, plus two copies, which will be retained by the Landscape Architect.
2. Larger Sheets, Not Larger Than 11 x 17 inches: Submit to the Owner the number of opaque reproductions which Contractor requires, plus two copies which will be retained by the Landscape Architect.
B. Documents for Information: Submit two copies.
C. Documents for Project Closeout: Make one copy of submittal originally reviewed.
D. Samples: Submit the number specified in individual specification sections, one of which will be retained by the Landscape Architect.
1. Retained samples will not be returned to Contractor unless specifically so stated. 111
Westacre Park Expansion and Renovation Project Section 01300 September 2024 Administrative Requirements
01300-5
3.09 SUBMITTAL PROCEDURES
A. Transmit each submittal with AIA Form G810.
B. Sequentially number the transmittal form. Revise submittals with original number and a sequential alphabetic suffix.
C. Identify Project, Contractor, Subcontractor or supplier; pertinent drawing and detail number; and specification section number, as appropriate on each copy.
D. Apply Contractor's stamp, signed or initialed certifying that review, approval, verification of Products required, field dimensions, adjacent construction Work, and coordination of information is in accordance with the requirements of the Work and Contract Documents.
E. Submit three (3) copies of each submittal for the landscape architect to retain plus the number of copies the Contractor would like returned for their use.
F. Deliver submittals to the Landscape Architect’s business address.
G. Schedule submittals to expedite the Project, and coordinate submission of related items.
H. Make submissions within the following number of days from issuance of Notice to Proceed:
1. Items needed in initial stages of work, or requiring long lead-time for ordering: 15 days.
2. All electrical equipment items: 21 calendar days
3. All other items including all samples: 30 calendar days I. For each submittal for review, allow 15 days excluding delivery time to and from the Contractor.
J. Identify variations from Contract Documents and Product or system limitations that may be detrimental to successful performance of the completed Work.
K. Provide space for Contractor and Landscape Architects review stamps.
L. When revised for resubmission, identify all changes made since previous submission.
M. Distribute copies of reviewed submittals as appropriate. Instruct parties to promptly report any Inability to comply with requirements.
N. Submittals not requested will not be recognized or processed. 112
Westacre Park Expansion and Renovation Project Section 01300 September 2024 Administrative Requirements
01300-6
END OF SECTION
113
Westacre Park Expansion and Renovation Project Section 01400 September 2024 Quality Requirements
01400-1
SECTION 01400
QUALITY REQUIREMENTS
PART1 GENERAL
1.01 SECTION INCLUDES
A. Control of installation.
B. Testing and inspection services.
1.02 RELATED SECTIONS
A. General Conditions
B. Section 01300 Submittals
C. Section 01700 Contract Closeout
D. Individual Specifications Section: Submittals, inspection and testing required, and standards for testing.
1.03 REFERENCES
A. Title 24, California Building Code, current edition.
B. ASTM C 1077 - Standard Practice for Laboratories Testing Concrete and Concrete Aggregates for Use in Construction and Criteria for Laboratory Evaluation.
1.04 TESTING AND INSPECTION AGENCIES
A. The respective Sections of these specifications contain detailed requirements for materials testing and inspections to be performed by an approved testing laboratory.
B. All costs incurred for testing laboratory services shall be paid for by the Owner.
However, should re-testing be required due to contractor’s failure to comply with the Contract Document requirements, the Contractor shall pay costs of re-testing.
1.05 OWNER’S RESPONSIBILITIES
A. Owners will select and employ a pre-qualified, independent testing laboratory to perform inspections, sampling and testing of materials as specified in the individual Specifications Section.
114
Westacre Park Expansion and Renovation Project Section 01400 September 2024 Quality Requirements
01400-2
B. Owner will pay for all initial testing laboratory services as described within the Contract Document or not normally required by codes and ordinances.
C. When the initial tests indicate non-compliance with the Contract Documents, the costs all subsequent re-testing occasioned by the non-compliance shall be deducted by the Owner from the Contract Sum.
1.06 CONTRACTOR’S RESPONSIBLITIES
A. Cooperate with laboratory personnel, provide access to work, arrange access to manufacturer’s operations.
B. Provide laboratory preliminary representative samples of materials to be tested, in required quantities.
C. Furnish copies of mill test reports.
D. Provide casual labor and facilities for access to work being tested; obtain and handle supplies at the site; facilitate inspections and tests; provide facilities for laboratory’s exclusive use for storage and curing of test samples.
E. Coordinate requests for testing by Owner-employed testing laboratory through the Owner’s Representative. Notify Owner’s Representative two (2) working days in advance of operations to allow for assignment of personnel and scheduling of tests.
F. Pay for additional laboratory inspections, sampling and testing required for Contractor’s convenience and when initial test indicate that work does not comply with Contract Documents.
G. Pay for inspections and tests required by code or ordinances or by a plan approval authority, and made by legally constituted authority (i.e., municipal deputy inspector), unless otherwise provided for the Contract Documents.
H. When required on individual Specifications Section, submit manufacturer’s certificate, executed by responsible officer, certifying that product meet or exceed specified requirements. Provide certification in duplicate.
1.07 TESTING LABORATORY RESPONSIBILITIES
A. Perform specified inspections, sampling and testing of materials and methods of construction, comply with specified standards. Ascertain compliance with requirements of Contract Documents.
B. Provide prompt notification of irregularities or deficiencies of work observed during performance of services.
115
Westacre Park Expansion and Renovation Project Section 01400 September 2024 Quality Requirements
01400-3
C. Perform additional inspections and tests required by Owner’s Representative.
D. After each inspection and test, promptly submit copies of laboratory report to the Owner. Reports are to include: Date issued, project title and number, name of inspector, date and time of sampling or inspection, identification of product and Specification Section(s), location in the project, type of inspection or test, date of test and results of test, When requested by Owner’s Representative provide interpretation of test results.
E. Testing Laboratory shall have no authority to: release, revoke, alter, or enlarge on requirements of Contract Documents; approve, accept or stop any portion of the work; perform any duties of the Contractor.
PART 2 PRODUCTS
NOT USED
PART 3 EXECUTION
NOT USED
END OF SECTION
116
Westacre Park Expansion and Renovation Project Section 01500 September 2024 Temporary Facilities and Controls
01500-1
SECTION 01500
TEMPORARY FACILITIES AND CONTROLS
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Temporary Field Office.
B. Temporary utilities.
C. Temporary telephone service.
D. Temporary sanitary facilities.
E. Temporary Controls: Barriers and fencing.
F. Security requirements.
G. Waste removal facilities and services.
H. Project identification sign.
I. Dust control.
J. Erosion control
K. Existing Conditions verification.
1.02 RELATED SECTIONS
A. Section 01510 - Temporary Utilities.
B. Section 01550 - Vehicular Access and Parking.
C. County General Conditions Section 10.
1.03 TEMPORARY UTILITIES - See Section 01510
1.04 TEMPORARY SANITARY FACILITIES
A. Provide and maintain portable construction toilet facilities for Contractor's employees and Owner Representatives.
1. Toilet Facilities: Provide sufficient suitably enclosed toilets with urinal for use by all trades engaged on project. The Owner shall approve location.
2. Washing Facilities: Provide properly mounted and adequate wash sinks connected to water supply, in location approved by the Owner.
3. Drinking Water Facilities: Provide clean, sanitary, and adequate drinking water.
B. Maintain daily in clean and sanitary condition.
1.05 BARRIERS AND ACCESS
A. Provide barriers to prevent unauthorized entry to construction areas, to allow for owner and residents access to their property and to protect existing facilities and adjacent properties from damage from construction operations and demolition.
B. Provide barricades required by governing authorities for public rights-of-way. 117
Westacre Park Expansion and Renovation Project Section 01500 September 2024 Temporary Facilities and Controls
01500-2
C. Protect non-owned vehicular traffic, stored materials, site, and structures from damage.
1.06 SECURITY
A. Contractor is responsible for security of areas of his work during the entire time of the Contract. Within this responsibility, the Contractor will repair and/or replace all damages to the work and loss of materials due to vandalism or theft. This includes damages to existing facilities due to construction activities.
1.07 VEHICULAR ACCESS AND PARKING
A. Coordinate access and haul routes with governing authorities and the Owner.
B. Provide and maintain access to fire hydrants and the emergency vehicle access and access to adjacent residential housing for the public and the Owner, free of obstructions.
C. Provide means of removing mud from vehicle wheels before entering streets.
1.08 WASTE REMOVAL
A. Provide waste removal facilities and services as required to maintain the site in clean and orderly condition.
B. Provide containers with lids. Dispose of waste off-site weekly.
1.09 PROJECT IDENTIFICATION SIGN
A. Provide project identification sign to be posted in advance of construction. Provide painted plywood project identification sign, size to be 4' x 6' and must last the duration of the Project. Sign to read: Site Improvements for the Mission Oaks Recreation and Park District, date-to date of construction, construction company name and contact phone number. Design approval of the sign by the Owner and shall be obtained prior to fabrication and construction.
B. Erect on site at location to be approved by the owner.
C. No other signs are allowed without Owner permission except those required by law.
1.10 FIELD OFFICE
Contractor may locate a field office trailer onsite. Size and location of trailer to be approved by Owner prior to placement.
118
Westacre Park Expansion and Renovation Project Section 01500 September 2024 Temporary Facilities and Controls
01500-3
1.11 DUST CONTROL
A. Use water wagons or spray from hoses to control dust created by work operations.
B. Comply with all local and state dust control ordinances.
1.12 EROSION CONTROL
A. Contractor is advised that the State of California has adopted National Pollution Discharge Elimination Requirements in accordance with the requirements of the Clean Water Act. This project is subject to all of the requirements contained in those acts. The contractor shall abide by all of the laws, ordinances, and regulations associated with the NPDES and the Clean Water Act.
B. The SWPPP must be maintained throughout the course of construction and be available at the construction site. The contractor is advised that he shall conform to this requirement and that he shall implement all of the measures required by the SWPPP, including maintenance of diligent record keeping and logs as required by the SWPPP.
C. The contractor shall provide copies of the updated SWPPP to the Owner prior to starting construction operations. The contractor shall provide copies of his SWPPP records and logs during the course of construction, on a monthly basis to the Owner.
The contractor shall also keep copies of these records and logs with the SWPPP at the construction site for potential viewing by the State of California Regional Water Quality Control Board.
1.13 EXISTING CONDITIONS VERIFICATION
A. Contractor shall record existing site conditions, either by photographs or video, to provide a record of pre-construction site conditions.
1.14 REMOVAL OF UTILITIES, FACILITIES, AND CONTROLS
A. Remove temporary field office, utilities, equipment, facilities, and materials prior to Final Application for Payment inspection.
B. Remove underground installations to a minimum depth of 2 feet.
C. Clean and repair damage caused by installation or use of temporary work.
D. Unless otherwise directed, restore existing and permanent facilities used during construction to original condition.
E. Maintenance and Removal:
1. Maintain all temporary facilities and controls as long as needed for safe and proper completion of work. Remove all such temporary facilities and controls as rapidly as progress of work will permit.
2. Non-compliance with requirements within this section may result in payment being withheld and/or deductive change orders for lack of proper facilities and controls. If necessary, the owner will provide such facilities and controls as required and back charge the Contractor.
119
Westacre Park Expansion and Renovation Project Section 01500 September 2024 Temporary Facilities and Controls
01500-4
PART 2 PRODUCTS
NOT USED
PART 3 EXECUTION
NOT USED
END OF SECTION
120
Westacre Park Expansion and Renovation Project Section 01510 September 2024 Temporary Utilities
01510-1
SECTION 01510
TEMPORARY UTILITIES
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Temporary Electricity.
B. Temporary Water.
1.02 RELATED SECTIONS
A. Section 01500 - Temporary Facilities and Controls: temporary sanitary facilities required by law.
1.03 TEMPORARY ELECTRICITY
A. Cost: By Contractor.
B. It is expected that electrical needs by the Contractor will only require their own generator. If additional electrical services are needed, then the following shall apply; C. Provide separate electrical source or metering and reimburse the Owner for cost of energy used. Exercise measures to conserve energy.
D. Provide temporary electric feeder from electrical service at location as directed.
E. Complement existing power service capacity and characteristics as required.
F. Provide power outlets for construction operations, with branch wiring and distribution boxes located as required. Provide flexible power cords as required.
G. Provide main service disconnect and over-current protection at convenient location and meter.
H. Permanent convenience receptacles may be utilized during construction.
I. Provide adequate distribution equipment, wiring, and outlets to provide single-phase branch circuits for power.
1.04 TEMPORARY WATER SERVICE
A. Cost of Water Used: By Contractor. Contractor to pay for water used for on-site work before irrigation system is connected.
B. Contractor to coordinate metering of water use with Owner.
C. Provide and maintain suitable quality water service for construction operations at time of project mobilization.
D. Extend branch piping with outlets located so water is available by hoses with threaded connections.
PART 2 PRODUCTS
NOT USED
PART 3 EXECUTION
NOT USED
END OF SECTION
121
Westacre Park Expansion and Renovation Project Section 01550 September 2024 Vehicular Access and Parking
01550-1
SECTION 01550
VEHICULAR ACCESS AND PARKING
PART1 GENERAL
1.01 SECTION INCLUDES
A. Parking.
B. Construction parking controls.
C. Haul routes.
1.02 RELATED SECTIONS
A. Section 01500 TEMPORARY FACILITIES AND CONTROLS
PART 2 – NOT USED
PART 3 EXECUTION
3.01 PARKING
A. Arrange for temporary parking at staging area to accommodate use of construction personnel.
B. Locate as approved by the Owner.
3.02 CONSTRUCTION PARKING CONTROL
A. Control vehicular parking to prevent interference with public traffic and parking, access by emergency vehicles, and Owner's operations.
3.03 HAUL ROUTES
A. Consult with authority having jurisdiction, establish public thoroughfares to be used for haul routes and site access.
B. Confine construction traffic to designated haul routes.
C. Maintain roads in satisfactory condition during the contract time. Repair damages attributable to work of the project at intervals as needed. At completion of Contract, roads and entryways shall be left in condition at least equal to that existing at start of Contract, except as may be otherwise required by Contract Documents.
D. Temporary access reads are to be provided by and completely removed by the Contractor upon completion of work.
END OF SECTION
122
Westacre Park Section 01570
September 2024 Environmental Protection
01570 - 1
SECTION 01570
ENVIRONMENTAL PROTECTION
PART 1 GENERAL
1.01 DESCRIPTION
A. This section describes the requirements for the conservation and protection of environmental resources at the work site during and as the result of construction activities, except as otherwise specified. State and federal environmental statutes, rules, regulations, and policies have been enacted to protect environmental resources by ensuring that significant environmental impacts of projects are identified and adequate mitigation measures are incorporated into the project.
Environmental protection affects several resource areas, including biological resources, cultural resources, air quality, and water quality. Potential impacts may occur through the generation of noise, dust emissions, discharges of pollutants, disturbances to terrestrial and aquatic areas, additional traffic, creation of traffic obstructions and other threats to public safety, and degradation of resources. Construction activities shall be in accordance with environmental and regulatory permits issued for the project and the Contractor may be held responsible for any violations as prescribed by law. If the Contractor's actions cause infractions that require suspension of work, then the Engineer may, without limiting the District's other rights and remedies, suspend work as specified in Article 13 of the General Conditions.
B. The Contractor shall be responsible for the sequence and control of construction activities, selection and maintenance of equipment, and the conduct of the Contractor's employees at the work site to ensure that specific mitigation measures to reduce or eliminate identified environmental impacts are implemented.
C. Contractor's personnel failing or refusing to carry out requirements of this section in the opinion of the Engineer, shall be removed from the work site if ordered.
D.Construction equipment failing to produce the quality of work within the requirements of this section, in the opinion of the Engineer, shall be removed from the work site if ordered.
E. The Contractor shall minimize construction activities causing disturbances to vegetation, wildlife or cultural resources. Construction activities may be restricted in various ways that include, but are not limited to, the environmental protection and/or mitigation measures specified.
1.02 RELATED SECTIONS
A. Drawings, General Conditions, Supplementary General Conditions, Special Provisions and other Division 1 sections apply to this section. This section may require direct correlation with the following sections of the contract:
1. Section 02260 – Landscape Grading
123
Westacre Park Section 01570
September 2024 Environmental Protection
01570 - 2
2. Section 02905 – Landscape Installation
1.03 REFERENCES
A. The following publications form a part of this specification to the extent referenced.
1. The District has obtained the following environmental documents/references and permits:
a. CEQA — California Environmental Quality Act of 1970:
1) ND — Negative Declaration.
2) Notice of Determination.
1.04 SUBMITTALS
A. The Contractor shall develop and submit five detailed plans for implementing the requirements of this section. The plans shall include but not be limited to the following:
1. Name of Contractor's supervisor responsible for implementing the plans.
2. Working drawings and data for implementing the requirements of the plans.
3. Air Quality Control Plan.
4. Water Quality Control Plan and Storm Water Pollution Prevention Plan (SWPPP) (Update existing SWPPP on file with the District). a. The Storm Water Pollution Prevention Plan (SWPPP) shall be submitted to the Regional Water Quality Control Board (RWQCB) prior to demolition work begins. The SWPPP must be approved by the RWQCB prior to the start of demolition activities.
5. Fire Prevention and Control Plan.
6. Noise Control Plan.
7. Traffic Control Plan.
B. The Contractor shall submit the above plans including working drawings and data to the District for approval five (5) working days prior to mobilization.
C. Copies of all of the above plans shall be maintained at the work site throughout the construction period.
124
Westacre Park Section 01570
September 2024 Environmental Protection
01570 - 3
1.05 DELIVERY, STORAGE, AND HANDLING OF HAZARDOUS MATERIALS A. Construction Sites and Equipment:
1. The storage, transportation, transfer, containment, and disposal of hazardous materials, such as fuel, oil, and lubricants have potential for affecting water quality. Fuel, oil and other petroleum products shall be stored only at designated sites. The use of hazardous materials shall be avoided or minimized where possible. Each hazardous material containment container shall be clearly labeled with its identity, handling and safety instructions, and emergency contact. Similar information shall be clearly available and visible in the storage areas. Storage and transfer of such materials shall not be allowed within 100 feet of streams or sites known to contain sensitive biological resources. Storage or use of hazardous materials in or near wet or dry streams shall be consistent with the Fish and Game Code and other State laws. Material Safety Data Sheets (MSDS) shall be made readily available to the Contractor's employees and other personnel at the work site. The accumulation and temporary storage of hazardous wastes shall not exceed 90 days. Soils contaminated by spills or cleaning wastes shall be contained and shall be removed to an approved disposal site. Disposal of hazardous wastes shall be in compliance with all applicable laws and regulations.
2. Petroleum drippings on equipment have potential to result in water pollution during construction. The Contractor shall maintain construction equipment to minimize petroleum drippings. All stationary power equipment such as engines, pumps, generators, welders, and air compressors shall be positioned over drip pans. Equipment used in water shall be free of exterior petroleum products prior to submersion, and shall be checked and maintained daily to keep the equipment exteriors clean.
3. Petroleum products shall be stored in nonleaking containers at impervious storage sites from which runoff is not permitted to escape.
4. Personnel stationed at or near these sites shall be trained in emergency response and spill containment techniques. An ample supply of absorbent pads, pillows, socks, booms, and other spill containment materials shall be maintained at the hazardous materials storage sites for use in the event of spills. Contaminated absorbent pads, pillows, socks, booms, and other spill containment materials shall be placed in nonleaking sealed container until transport to an appropriate disposal facility. The Contractor shall furnish to the Engineer a contact person and telephony number of a company experienced in emergency response for vacuuming and containing spills of oil or other petroleum products.
5. Fuel may be transferred from the storage areas to construction equipment by tanker trucks. Fuel transfers shall take place at least 100 feet from exclusion zones, drainage areas, water bodies and streams.
6. Fuel transfer vehicles shall have absorbent pads, pillows, socks, booms or other spill containment materials placed under the fueling operation (between the fuel 125
Westacre Park Section 01570
September 2024 Environmental Protection
01570 - 4
truck and the equipment being serviced). A trained service attendant shall monitor the filling of equipment and shall stop the fuel flow immediately if any spill occurs. Fuel transfer shall not resume until the problem is resolved to the satisfaction of the Engineer. The service attendant shall be trained in emergency response, fire extinguisher use, and spill containment techniques.
1.06 SENSITIVE SPECIES - NOT USED
1.07 COLLECTION AND HARASSMENT OF SPECIES
A. No intentional harassment, killing, or collection of plants or animals at or around the work site will be allowed.
1.08 BOUNDARIES OF WORK SITE AND LISTED SENSITIVE SPECIES A. The boundaries of the work site is as shown on the construction drawings for showing exact location of work and areas that may be occupied by the Contractor. The Contractor and the Contractor's employees shall not leave the right of way or temporary construction easement, without prior written approval.
B. Preconstruction surveys will be conducted to designate exclusion zones.
C. Exclusion zones will be marked with either large flagged stakes connected by cord, or survey laths or wooden stakes prominently flagged with survey ribbon or fencing.
The Contractor and Contractor's employees shall not encroach into flagged exclusion zones in any manner, whether in vehicles or on foot, without prior written approval.
D. No pets, camping, firearms, or any other use of the right of way area will be allowed.
Harassment, killing, or destruction of dens or burrows of wildlife species is strictly prohibited. Contractor's employees shall not be allowed at the work site during nonworking hours. Only authorized camping areas may be utilized. Exceptions that will not cause environmental impacts to biological resources may be allowed by the Engineer.
E. Food-related trash, such as wrappers, cans, bottles, and scraps shall be placed in closed containers and removed daily from work sites. All trash or garbage shall be removed to a county approved disposal site at least weekly by the Contractor. The right of way shall be policed daily by Contractor's personnel and monitored by inspectors or environmental personnel.
F. Traffic shall be restricted to existing roads and flagged right of way or temporary construction easement. Construction related vehicles shall not exceed 25 mph on straight and level roads, with a 10 mph speed limit in areas of steepness or with curves. 126
Westacre Park Section 01570
September 2024 Environmental Protection
01570 - 5
1.09 BIOLOGICAL RESOURCES (PLANTS AND ANIMALS)
A. The Construction activities have potential for affecting the biological resources by physical destruction, disturbance, and/or displacement.
B. The Contractor shall not be permitted in areas where sensitive plant species occur until the sensitive plants are removed or soil seed banks are removed by the District.
C. Unless otherwise approved, the Contractor shall not apply any rodenticide or herbicide to control any vertebrate or plant pest.
1.10 CULTURAL RESOURCES
A. See also Special Provisions
B. The construction activities have potential for affecting cultural resources such as historically significant resources, local land uses, commercial establishments, or the activities of local landowners, residents, or recreationalists.
C. The Contractor shall reduce potential adverse impacts to cultural resources that may be associated with construction by implementing the preservation of culturally significant resources in accordance with the National Historic Preservation Act of 1966, (16 U.S.C.470).
D. If any potential paleontological, archaeological or historic sites are uncovered, the Owners Representative will be notified prior to proceeding with the work affected. If necessary the Engineer will suspend work as specified in Article 13 of the General Conditions. The Owners Representative will provide for an initial field evaluation of the site within seventy-two (72) hours after receiving notification of Contractor's discovery.
E.If human remains are exposed, all construction activities shall be halted in the immediate vicinity until the County Coroner has assessed the remains.
1.11 AIR QUALITY CONTROL PLAN
A. See also Special Provisions.
B. The construction activities have potential for resulting in localized, short-term construction emissions from stationary, mobile and area sources, and fugitive dust from construction equipment, and trucks for hauling.
C. The Contractor shall reduce these effects by submitting and implementing an Air Quality Control Plan. The following components, if applicable, shall be included in the plan and if not applicable the Contractor shall explain in the plan why that component or portions thereof is not included in the plan.
127
Westacre Park Section 01570
September 2024 Environmental Protection
01570 - 6
D. Fugitive dust shall be minimized by watering, minimizing cleared areas, covering exposed surfaces, seeding, managing activities to keep the active work area small at any given time, applying chemical suppressant or implementing other dust control measures as approved. One or more of the above control measures shall be used sufficiently to prevent fugitive dust from leaving the work site. Increased application of control measures shall be required whenever conditions cause fugitive dust.
E. The Contractor shall control fugitive dust by:
1. Minimizing areas cleared to facilitate construction, such as storage areas, staging areas, stockpile areas and vehicle parking.
2. Covering spoil piles when necessary.
3. Constructing roadways, driveways, sidewalks, building pads and other graded surfaces.
4. Chipping cleared vegetation and covering exposed areas as work is completed.
5. Performing seeding requirements as required.
6. Minimizing the amount of construction equipment operating during any given time period. This includes scheduling of construction truck trips to reduce peak emission, limit the length of the construction workday, and phasing of construction activities.
7. Covering haul trucks traveling onto or off the work site. Haul trucks traveling on the work site shall be covered as necessary to prevent dust from leaving the work site.
1.12 WATER QUALITY CONTROL PLAN AND STORM WATER POLLUTION PREVENTION PLAN
A. The construction activities have potential for resulting in localized, short-term impacts to water quality due to fuel or oil leaks or spills at fuel or oil transfer areas, erosion and runoff.
B. The Contractor shall prepare a Storm Water Pollution Prevention Plan (SWPPP) for the General Construction Storm Water Permit. Development of the SWPPP shall be accomplished by the Contractor using guidelines provided by the State Water Resources Control Board (SWRCB) for containment of construction activity pollutants such as wastes, erosion, and sediments. The SWPPP shall be submitted to the Regional Water Quality Control Board (RWQCB) five (5) working days prior to field mobilization. The SWPPP must be approved by the RWQCB prior to the start of construction activities. Guidelines for the SWPPP are presented in the Construction Storm Water Permit Package available at the Redding, California, office of the RWQCB. The SWPPP shall include provisions for water quality protection and for implementing Best Management Practices (BMPs) chosen to reduce and mitigate construction activity pollutants. The Contractor shall implement this plan during all construction activities by providing BMPs and conforming to the following provisions.
C. Erosion could potentially cause impacts both on and off the work site. On the work site, erosion could wash away soil and fill material, resulting in the formation of gullies. Off the work site, erosion could result in downstream sedimentation and turbidity impacts.
Additionally, the Contractor shall:
1. Restrict personnel to designated roads.
128
Westacre Park Section 01570
September 2024 Environmental Protection
01570 - 7
2. Use methods for controlling erosion on designated roads.
3. Use methods for on-site erosion control and sediment capture methods during construction.
4. Minimize erosion during stormy weather at the work site.
5. Use methods for post construction erosion control.
6. If drainage swales are employed as BMPs, they shall be vegetated or otherwise protected to reduce erosion.
7. Contact personnel and emergency procedures shall be posted at the work site to avoid and minimize loss of property and life in case of a significant storm event.
8. The project Storm Water Pollution Prevention Plan (SWPPP) shall be strictly implemented.
9. All settleable solids, oils, and grease shall be contained to prevent their release into the environment. Flocculents may be used on solids that do not readily settle, as long as they do not contaminate water quality.
10. Excess construction and operation materials, rubble, and excavated soil shall be either reused or disposed of in approved sites. All imported fill shall be obtained from approved sources
11. Exposed areas shall be stabilized with temporary mulching, landscaping, and other erosion control methods during and after land disturbance activities.
12. Areas of disturbance with slopes toward a stream shall be stabilized to reduce erosion potential.
13. Stock piles shall be protected from erosion either by covering them or by placing barriers (e.g. silt fence, sand bags) around their perimeter to prevent the escape of sediments.
14. Spoil disposal areas shall be graded to ensure that drainage from these sites will minimize erosion of spoil materials and adjacent native soil material. Grading shall conform with the existing topography of the area.
D. Streams, Creeks, Drainages or Waterbody Crossings:
1. Berms or other diversion structures may be constructed around the work site to allow uninterrupted flow in streams, creeks or waterbody crossings. Construction shall be separated into two phases to maintain flows through half the waterbody width unless otherwise directed. When the diversion is installed, water shall be directed into siltation basins. If straw bales are used to form the basins, water shall be allowed to settle, filter through the straw, and flow over the natural terrain before returning to the stream. If earth fill is used to form the berm, water shall be allowed to settle, and flow over the 129
Westacre Park Section 01570
September 2024 Environmental Protection
01570 - 8
protected berm onto the natural terrain before returning to the stream.
2. Earth moving activities shall not occur in streams, creeks, waterbody crossings, or riparian areas within 24 hours of predicted 50 percent chance of National Weather Service anticipated precipitation during the rainy season (November 15 through April 15). Stockpiled topsoil or backfill shall be stored above the stream high water mark, outside any riparian zone, and not in any area where the stockpiled material could be washed back into the stream. Straw bales or other BMPs shall be used at flowing river or creek crossings at the end of each workday during the rainy season, and at the end of each workday during other seasons when rain is forecast. If a major storm is predicted or occurs outside of the rainy season, straw bales or other BMPs shall be implemented immediately.
3. Any diversion site, siltation basin and other measures shall be inspected during day light hours and after normal working hours during adverse weather conditions for proper operation. Any measure not operating properly or effectively shall be corrected immediately.
1.14 FIRE PREVENTION AND CONTROL PLAN
A. The Contractor shall prepare a fire prevention and control plan in consultation with the Engineer, and responsible fire protection agency(s). The following components, if applicable, shall be included in the plan, and if not applicable the Contractor shall explain in the plan why that component or a portion thereof is not included in the plan:
1. Procedures and policies for controlling any fires including fires that are off the work site, and other related fire prevention and control procedures developed in consultation with resource agencies and fire protection agency(s).
2. No fires will be allowed at the work site. Smoking will be allowed only in areas designated for smoking which shall be cleared of vegetation or in enclosed vehicles.
3. The Contractor shall be responsible for maintaining appropriate fire suppression equipment at the work site. Fire extinguishers, shovels and other fire fighting equipment, shall be inventoried and available at work sites and on construction equipment. Each vehicle on the right of way shall be equipped with a minimum 20 pound (or two 10 pound) fire extinguisher(s) and a minimum of five gallons of water in a fire fighting apparatus (e.g. bladder bag).
4. At the work site, a sealed fire toolbox shall be located at a point accessible in the event of fire.
This fire toolbox shall contain: one backpack pump-type extinguisher filled with water, two axes, two McLeod fire tools, and enough shovels so that each employee at the work site can be equipped to fight fire.
5. One or more chainsaws of 3-1/2 or more horsepower with a cutting bar 20 inches in length or longer shall be immediately available at the work site. 130
Westacre Park Section 01570
September 2024 Environmental Protection
01570 - 9
6. Gasoline powered construction equipment with catalytic converters shall be equipped with shielding or other acceptable fire prevention features. Internal combustion engines shall be equipped with spark arrestors.
7. Welding sites shall include fire prevention provisions.
8. The Contractor shall maintain contact with local fire fighting agencies throughout the fire season for update on fire conditions and such fire conditions shall be communicated to the Contractor's employees and the Engineer daily.
9. Vehicles are restricted to the work site unless otherwise allowed for fire control procedures.
10. Disturbance to the terrestrial or aquatic environment through the use of heavy construction equipment shall be kept to a minimum. Clearing of vegetation shall occur from the outer boundaries of the work area toward the interior. If a fire should start, the appropriate fire protection agencies responsible shall be contacted immediately. Hand crews, fire fighting water trucks or other fire control measures may be used as a first defense. Only as required, heavy construction equipment shall be utilized to contain the fire or protect a structure from damage.
1.15 NOISE CONTROL PLAN
A. The Contractor shall prepare a Noise Control Plan in consultation with the District and the Engineer. The following components, if applicable, shall be included in the plan. If the components are not applicable, the Contractor shall explain in the plan why the component or portion is not included in the plan.
1. All construction vehicles and equipment, fixed or mobile, shall be equipped with properly operating and maintained mufflers.
2. Stockpiling and vehicle staging areas shall be sited as far as practical from residences.
3. Hours of construction shall be limited to the hours specified in applicable local noise ordinances.
PART 2 PRODUCTS
NOT USED
PART 3 EXECUTION
NOT USED
PART 4 PAYMENT
NOT USED
END OF SECTION
131
Westacre Park Expansion and Renovation Project Section 01600 September 2024 Product Requirements
01600-1
SECTION 01600
PRODUCT REQUIREMENTS
PART 1 GENERAL
1.01 SECTION INCLUDES
A. General product requirements.
B. Transportation, handling, storage and protection.
C. Product option requirements.
D. Substitution limitations and procedures.
E. Spare parts and maintenance materials.
1.02 RELATED SECTIONS
A. Section 01400 - Quality Requirements: Product quality monitoring.
B. Section 01300 - Submittal; review, information, procedure and project closeout.
1.03 SUBMITTALS
A. Product Data Submittals: Submit manufacturer's standard published data. Mark each copy to identify applicable products, models, options, and other data. Supplement manufacturers' standard data to provide information specific to this Project.
B. Also see Section 01300 for Submittal requirements.
C. Shop Drawing Submittals: Prepared specifically for this Project.
D. Sample Submittals: Illustrate functional and aesthetic characteristics of the product, with integral parts and attachment devices. Coordinate sample submittals for interfacing work. For selection from standard finishes, submit samples of the full range of the manufacturer's standard colors, textures, and patterns.
E. Indicate utility and electrical characteristics, utility connection requirements, and location of utility outlets for service for functional equipment and appliances.
PART 2 PRODUCTS
2.01 EXISTING PRODUCTS
A. Provide interchangeable components of the same manufacture for components being replaced.
2.02 PRODUCT OPTIONS
A. Products Specified by Reference Standards or by Description Only: Use any product meeting those standards or description.
B. Products Specified by Naming One or More Manufacturers: Use a product of one of the manufactures named and meeting specifications, no options or substitutions allowed.
C. Products Specified by Naming One or More Manufacturers with a Provision for Substitutions: Submit a request for substitution for any manufacturer not named.
2.03 SPARE PARTS AND MAINTENANCE PRODUCTS
A. Provide spare parts, maintenance, and extra products of types and in quantities specified in individual specification sections.
B. Deliver to Project site; provide receipts to owner as part of close out documents. 132
Westacre Park Expansion and Renovation Project Section 01600 September 2024 Product Requirements
01600-2
PART 3 EXECUTION
3.01 SUBSTITUTION PROCEDURES
A. Instructions to Bidders specify time restrictions for submitting requests for substitutions during the bidding period. Comply with requirements specified in this section.
B. Document each request with complete data substantiating compliance of proposed substitution with Contract Documents.
C. A request for substitution constitutes a representation that the submitter:
1. Has investigated proposed product and determined that it meets or exceeds the quality level of the specified product.
2. Will provide the same warranty for the substitution as for the specified product.
3. Will coordinate installation and make changes to other Work which may be required for the Work to be complete with no additional cost to the Owner.
4. Waives claims for additional costs or time extension which may subsequently become apparent.
D. Substitution Submittal Procedure:
1. Submit three copies of request for substitution for consideration. Limit each request to one proposed substitution.
2. Submit shop drawings, product data, and certified test results attesting to the proposed product equivalence. Burden of proof is on proposer.
3. The Owner will notify Contractor in writing of decision to accept or reject request.
3.02 TRANSPORTATION AND HANDLING
A. Transport and handle products in accordance with manufacturer's instructions.
B. Promptly inspect shipments to ensure that products comply with requirements, quantities are correct, and products are undamaged.
C. Provide equipment and personnel to handle products by methods to prevent soiling disfigurement or damage.
3.03 STORAGE AND PROTECTION
A. Store and protect products in accordance with manufacturers' instructions.
B. Store with seals and labels intact and legible.
C. Store sensitive products in weather tight, climate controlled, enclosures in an environment favorable to product.
D. For exterior storage of fabricated products, place on sloped supports above ground.
E. Provide bonded off-site storage and protection when site does not permit on-site storage or protection.
F. Cover products subject to deterioration with impervious sheet covering. Provide ventilation to prevent condensation and degradation of products.
G. Store loose granular materials on solid flat surfaces in a well-drained area. Prevent mixing with foreign matter.
H. Provide equipment and personnel to store products by methods to prevent soiling, disfigurement, or damage.
I. Arrange storage of products to permit access for inspection. Periodically inspect to verify products are undamaged and are maintained in acceptable condition.
J. Deliveries of plant materials must be scheduled so that plant materials arrive no more than five calendar days prior to planting When temperatures exceed 90 degrees F, 133
Westacre Park Expansion and Renovation Project Section 01600 September 2024 Product Requirements
01600-3
plants must be stored under shade cloth and watered at least twice each day, as required to maintain plants in a healthy, turgid condition. Wilted and/or otherwise unhealthy plants shall be immediately removed from the job site.
END OF SECTION
134
Westacre Park Expansion and Renovation Project Section 01700 September 2024 Execution Requirements
01700 - 1
SECTION 01700
EXECUTION REQUIREMENTS
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification Sections, apply to this Section.
1.2 SUMMARY
A. This Section includes general procedural requirements governing execution of the Work including, but not limited to, the following:
1. Construction layout.
2. Field engineering and surveying.
3. General installation of products.
4. Coordination of Owner-installed products.
5. Progress cleaning.
6. Starting and adjusting.
7. Protection of installed construction.
8. Correction of the Work.
B. Related Sections include the following:
1. General Conditions Section "Cutting and Patching" for procedural requirements for cutting and patching necessary for the installation or performance of other components of the Work.
2. Division 1 Section "Closeout Procedures" for submitting final property survey with Project Record Documents, recording of Owner-accepted deviations from indicated lines and levels, and final cleaning.
1.3 SUBMITTALS
A. Qualification Data: For land surveyor.
B. Certificates: Submit certificate signed by land surveyor certifying that location and elevation of improvements comply with requirements.
135
Westacre Park Expansion and Renovation Project Section 01700 September 2024 Execution Requirements
01700 - 2
C. Landfill Receipts: Submit copy of receipts issued by a landfill facility, licensed to accept hazardous materials, for hazardous waste disposal.
D. Certified Surveys: Submit two copies signed by land surveyor.
E. Final Project Survey: Submit digital copies in AutoCAD and Adobe Acrobat format showing the Work performed and recorded survey data.
1.4 QUALITY ASSURANCE
A. Land Surveyor Qualifications: A professional land surveyor who is legally qualified to practice in jurisdiction where Project is located and who is experienced in providing land-surveying services of the kind indicated.
PART 2 - PRODUCTS Not Used
PART 3 - EXECUTION
3.1 EXAMINATION
A. Existing Conditions: The existence and location of site improvements, utilities, and other construction indicated as existing are not guaranteed. Before beginning work, investigate and verify the existence and location of mechanical and electrical systems and other construction affecting the Work.
1. Before construction, verify the location and points of connection of utility services.
B. Existing Utilities: The existence and location of underground and other utilities and construction indicated as existing are not guaranteed. Before beginning site work, investigate and verify the existence and location of underground utilities and other construction affecting the Work.
1. Before construction, verify the location and invert elevation at points of connection of sanitary sewer, storm sewer, and water-service piping; and underground electrical services.
2. Furnish location data for work related to Project that must be performed by public utilities serving Project site.
C. Acceptance of Conditions: Examine substrates, areas, and conditions, with Installer or Applicator present where indicated, for compliance with requirements for installation tolerances and other conditions affecting performance. Record observations. 136
Westacre Park Expansion and Renovation Project Section 01700 September 2024 Execution Requirements
01700 - 3
1. Written Report: Where a written report listing conditions detrimental to performance of the Work is required by other Sections, include the following:
a. Description of the Work.
b. List of detrimental conditions, including substrates. c. List of unacceptable installation tolerances.
d. Recommended corrections.
2. Verify compatibility with and suitability of substrates, including compatibility with existing finishes or primers.
3. Examine roughing-in for mechanical and electrical systems to verify actual locations of connections before equipment and fixture installation.
4. Examine walls, floors, and roofs for suitable conditions where products and systems are to be installed.
5. Proceed with installation only after unsatisfactory conditions have been corrected.
Proceeding with the Work indicates acceptance of surfaces and conditions.
3.2 PREPARATION
A. Existing Utility Information: Furnish information to local utility or Owner that is necessary to adjust, move, or relocate existing utility structures, utility poles, lines, services, or other utility appurtenances located in or affected by construction.
Coordinate with authorities having jurisdiction.
B. Field Measurements: Take field measurements as required to fit the Work properly.
Recheck measurements before installing each product. Where portions of the Work are indicated to fit to other construction, verify dimensions of other construction by field measurements before fabrication. Coordinate fabrication schedule with construction progress to avoid delaying the Work.
C. Space Requirements: Verify space requirements and dimensions of items shown diagrammatically on Drawings.
D. Review of Contract Documents and Field Conditions: Immediately on discovery of the need for clarification of the Contract Documents, submit a request for information to Owner. Include a detailed description of problem encountered, together with recommendations for changing the Contract Documents. Changes to Work due to Contractors negligence to contact Owner for clarification shall be paid by Contractor.
3.3 CONSTRUCTION LAYOUT
A. Verification: Before proceeding to lay out the Work, verify layout information shown on Drawings, in relation to the property survey and existing benchmarks. If discrepancies are discovered, notify Owner promptly.
137
Westacre Park Expansion and Renovation Project Section 01700 September 2024 Execution Requirements
01700 - 4
B. General: Engage a land surveyor to lay out the Work using accepted surveying practices.
1. Establish benchmarks and control points to set lines and levels at each story of construction and elsewhere as needed to locate each element of Project.
2. Establish dimensions within tolerances indicated. Do not scale Drawings to obtain required dimensions.
3. Inform installers of lines and levels to which they must comply.
4. Check the location, level and plumb, of every major element as the Work progresses.
5. Notify Owner when deviations from required lines and levels exceed allowable tolerances.
6. Close site surveys with an error of closure equal to or less than the standard established by authorities having jurisdiction.
C. Site Improvements: Locate and lay out site improvements, including pavements, grading, fill and topsoil placement, utility slopes, and invert elevations.
D. Building Lines and Levels: Locate and lay out control lines and levels for structures, building foundations, column grids, and floor levels, including those required for mechanical and electrical work. Transfer survey markings and elevations for use with control lines and levels. Level foundations and piers from two or more locations.
E. Record Log: Maintain a log of layout control work. Record deviations from required lines and levels. Include beginning and ending dates and times of surveys, weather conditions, name and duty of each survey party member, and types of instruments and tapes used. Make the log available for reference by the Owner.
3.4 FIELD ENGINEERING
A. Identification: Owner will identify existing benchmarks, control points, and property corners.
B. Reference Points: Locate existing permanent benchmarks, control points, and similar reference points before beginning the Work. Preserve and protect permanent benchmarks and control points during construction operations.
1. Do not change or relocate existing benchmarks or control points without prior written approval of Owner. Report lost or destroyed permanent benchmarks or control points promptly. Report the need to relocate permanent benchmarks or control points to Owner before proceeding.
2. Replace lost or destroyed permanent benchmarks and control points promptly.
Base replacements on the original survey control points. 138
Westacre Park Expansion and Renovation Project Section 01700 September 2024 Execution Requirements
01700 - 5
C. Benchmarks: Establish and maintain a minimum of two permanent benchmarks on Project site, referenced to data established by survey control points. Comply with authorities having jurisdiction for type and size of benchmark.
1. Record benchmark locations, with horizontal and vertical data, on Project Record Documents.
2. Where the actual location or elevation of layout points cannot be marked, provide temporary reference points sufficient to locate the Work.
3. Remove temporary reference points when no longer needed. Restore marked construction to its original condition.
D. Certified Survey: On completion of foundation walls, major site improvements, and other work requiring field-engineering services, prepare a certified survey showing dimensions, locations, angles, and elevations of construction and site work.
3.5 INSTALLATION
A. General: Locate the Work and components of the Work accurately, in correct alignment and elevation, as indicated.
1. Make vertical work plumb and make horizontal work level.
2. Where space is limited, install components to maximize space available for maintenance and ease of removal for replacement.
3. Conceal pipes, ducts, and wiring in finished areas, unless otherwise indicated.
4. Maintain minimum headroom clearance of 8 feet (2.4 m) in spaces without a suspended ceiling.
B. Comply with manufacturer's written instructions and recommendations for installing products in applications indicated.
C. Install products at the time and under conditions that will ensure the best possible results. Maintain conditions required for product performance until Substantial Completion.
D. Conduct construction operations so no part of the Work is subjected to damaging operations or loading in excess of that expected during normal conditions of occupancy.
E. Tools and Equipment: Do not use tools or equipment that produce harmful noise levels.
F. Templates: Obtain and distribute to the parties involved templates for work specified to be factory prepared and field installed. Check Shop Drawings of other work to confirm that adequate provisions are made for locating and installing products to comply with indicated requirements.
G. Anchors and Fasteners: Provide anchors and fasteners as required to anchor each component securely in place, accurately located and aligned with other portions of the Work.
139
Westacre Park Expansion and Renovation Project Section 01700 September 2024 Execution Requirements
01700 - 6
1. Mounting Heights: Where mounting heights are not indicated, mount components at heights directed by Owner.
2. Allow for building movement, including thermal expansion and contraction.
3. Coordinate installation of anchorages. Furnish setting drawings, templates, and directions for installing anchorages, including sleeves, concrete inserts, anchor bolts, and items with integral anchors, that are to be embedded in concrete or masonry. Deliver such items to Project site in time for installation.
H. Joints: Make joints of uniform width. Where joint locations in exposed work are not indicated, arrange joints for the best visual effect. Fit exposed connections together to form hairline joints.
I. Hazardous Materials: Use products, cleaners, and installation materials that are not considered hazardous.
3.6 PROGRESS CLEANING
A. General: Clean Project site and work areas daily, including common areas. Coordinate progress cleaning for joint-use areas where more than one installer has worked.
Enforce requirements strictly. Dispose of materials lawfully.
1. Comply with requirements in NFPA 241 for removal of combustible waste materials and debris.
2. Do not hold materials more than 7 days during normal weather or 3 days if the temperature is expected to rise above 80 deg F (27 deg C).
3. Containerize hazardous and unsanitary waste materials separately from other waste. Mark containers appropriately and dispose of legally, according to regulations.
B. Site: Maintain Project site free of waste materials and debris.
C. Work Areas: Clean areas where work is in progress to the level of cleanliness necessary for proper execution of the Work.
1. Remove liquid spills promptly.
2. Where dust would impair proper execution of the Work, broom-clean or vacuum the entire work area, as appropriate.
D. Installed Work: Keep installed work clean. Clean installed surfaces according to written instructions of manufacturer or fabricator of product installed, using only cleaning materials specifically recommended. If specific cleaning materials are not recommended, use cleaning materials that are not hazardous to health or property and that will not damage exposed surfaces.
E. Concealed Spaces: Remove debris from concealed spaces before enclosing the space. 140
Westacre Park Expansion and Renovation Project Section 01700 September 2024 Execution Requirements
01700 - 7
F. Exposed Surfaces in Finished Areas: Clean exposed surfaces and protect as necessary to ensure freedom from damage and deterioration at time of Substantial Completion.
G. Waste Disposal: Burying or burning waste materials on-site will not be permitted.
Washing waste materials down sewers or into waterways will not be permitted.
H. During handling and installation, clean and protect construction in progress and adjoining materials already in place. Apply protective covering where required to ensure protection from damage or deterioration at Substantial Completion.
I. Clean and provide maintenance on completed construction as frequently as necessary through the remainder of the construction period. Adjust and lubricate operable components to ensure operability without damaging effects.
J. Limiting Exposures: Supervise construction operations to assure that no part of the construction completed or in progress, is subject to harmful, dangerous, damaging, or otherwise deleterious exposure during the construction period.
3.7 STARTING AND ADJUSTING
A. Start equipment and operating components to confirm proper operation. Remove malfunctioning units, replace with new units, and retest.
B. Adjust operating components for proper operation without binding. Adjust equipment for proper operation.
C. Test each piece of equipment to verify proper operation. Test and adjust controls and safeties. Replace damaged and malfunctioning controls and equipment.
D. Manufacturer's Field Service: If a factory-authorized service representative is required to inspect field-assembled components and equipment installation, comply with qualification requirements in Division 1 Section "Quality Requirements."
3.8 PROTECTION OF INSTALLED CONSTRUCTION
A. Provide final protection and maintain conditions that ensure installed Work is without damage or deterioration at time of Substantial Completion.
B. Comply with manufacturer's written instructions for temperature and relative humidity.
3.9 CORRECTION OF THE WORK
A. Repair or remove and replace defective construction. Restore damaged substrates and finishes. Comply with requirements in General Conditions Section "Cutting and Patching."
141
Westacre Park Expansion and Renovation Project Section 01700 September 2024 Execution Requirements
01700 - 8
1. Repairing includes replacing defective parts, refinishing damaged surfaces, touching up with matching materials, and properly adjusting operating equipment.
B. Restore permanent facilities used during construction to their specified condition.
C. Remove and replace damaged surfaces that are exposed to view if surfaces cannot be repaired without visible evidence of repair.
D. Repair components that do not operate properly. Remove and replace operating components that cannot be repaired.
E. Remove and replace chipped, scratched, and broken glass or reflective surfaces.
END OF SECTION
142
Westacre Park Expansion and Renovation Project Section 01770 September 2024 Closeout Procedures
01770-1
SECTION 01770
CLOSEOUT PROCEDURES
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification Sections, apply to this Section.
1.2 SUMMARY
A. This Section includes administrative and procedural requirements for contract closeout, including, but not limited to, the following:
1. Inspection procedures.
2. Warranties.
3. Final cleaning.
B. Related Sections include the following:
1. General Conditions "Payments and Completion" section for requirements for Final Completion and Final Payment.
2. Division 1 Section "Execution Requirements" for progress cleaning of Project site.
3. Division 1 Section "Project Record Documents" for submitting Record Drawings, Record Specifications, and Record Product Data.
4. Division 1 Section "Operation and Maintenance Data" for operation and maintenance manual requirements.
5. Divisions 2 through 16 Sections for specific closeout and special cleaning requirements for the Work in those Sections.
1.3 SUBSTANTIAL COMPLETION
A. Preliminary Procedures: Before requesting inspection for determining date of Substantial Completion, complete the following. List items below that are incomplete in request.
1.Prepare a list of items to be completed and corrected (punch list), the value of items on the list, and reasons why the Work is not complete. 143
Westacre Park Expansion and Renovation Project Section 01770 September 2024 Closeout Procedures
01770-2
2.Advise Owner of pending insurance changeover requirements.
3.Submit specific warranties, workmanship bonds, maintenance service agreements, final certifications, and similar documents.
4.Obtain and submit releases permitting Owner unrestricted use of the Work and access to services and utilities. Include occupancy permits, operating certificates, and similar releases.
5. Prepare and submit Project Record Documents, operation and maintenance manuals, damage or settlement surveys, property surveys, and similar final record information.
6.Deliver tools, spare parts, extra materials, and similar items to location designated by Owner. Label with manufacturer's name and model number where applicable.
7.Make final changeover of permanent locks and deliver keys to Owner. Advise Owner's personnel of changeover in security provisions.
8.Complete startup testing of systems.
9.Submit test/adjust/balance records.
10. Terminate and remove temporary facilities from Project site, along with mockups, construction tools, and similar elements.
11. Advise Owner of changeover any applicable utilities.
12. Submit changeover information related to Owner's occupancy, use, operation, and maintenance.
13. Complete final cleaning requirements, including touchup galvanized painting.
14. Touch up and otherwise repair and restore marred exposed finishes to eliminate visual defects.
B. Inspection: Submit a written request for inspection for Substantial Completion. On receipt of request, Landscape Architect will either proceed with inspection or notify Contractor of unfulfilled requirements. Landscape Architect will prepare the Certificate of Substantial Completion after inspection or will notify Contractor of items, either on Contractor's list or additional items identified by Landscape Architect, that must be completed or corrected before certificate will be issued.
1. Reinspection: Request reinspection when the Work identified in previous inspections as incomplete is completed or corrected.
2. Results of completed inspection will form the basis of requirements for Final Completion.
1.4 FINAL COMPLETION
A. Preliminary Procedures: Before requesting final inspection for determining date of Final Completion, complete the following:
1. Submit a final Application for Payment according to General Conditions "Payments and Completion".
144
Westacre Park Expansion and Renovation Project Section 01770 September 2024 Closeout Procedures
01770-3
2. Submit certified copy of Owner’s Substantial Completion inspection list of items to be completed or corrected (punch list), endorsed and dated by Owner.
The certified copy of the list shall state that each item has been completed or otherwise resolved for acceptance.
3. Submit evidence of final, continuing insurance coverage complying with insurance requirements.
4. Instruct Owner's personnel in operation, adjustment, and maintenance of products, equipment, and systems.
B. Inspection: Submit a written request for final inspection for acceptance. On receipt of request, Landscape Architect will either proceed with inspection or notify Contractor of unfulfilled requirements. Owner will prepare a final Certificate for Payment after inspection or will notify Contractor of construction that must be completed or corrected before certificate will be issued.
1. Reinspection: Request reinspection when the Work identified in previous inspections as incomplete is completed or corrected.
1.5 LIST OF INCOMPLETE ITEMS (PUNCH LIST)
A. Preparation: Submit three copies of list. Include name and identification of each space and area affected by construction operations for incomplete items and items needing correction including, if necessary, areas disturbed by Contractor that are outside the limits of construction.
1. Organize list of spaces in sequential order.
2. Organize items applying to each space by major element, including categories for grading, concrete, fences, walls, irrigation and planting.
3. Include the following information at the top of each page:
a. Project name.
b. Date.
c. Name of Owner Representative
d. Name of Contractor.
e. Page number.
1.6 WARRANTIES
A. Submittal Time: Submit written warranties on request of Landscape Architect for designated portions of the Work where commencement of warranties other than date of Substantial Completion is indicated.
B. Partial Occupancy: Submit properly executed warranties within 15 days of completion of designated portions of the Work that are completed and occupied or used by Owner during construction period by separate agreement with Contractor. 145
Westacre Park Expansion and Renovation Project Section 01770 September 2024 Closeout Procedures
01770-4
C. Organize warranty documents into an orderly sequence based on the table of contents of the Project Manual.
1. Bind warranties and bonds in heavy-duty, 3-ring, vinyl-covered, loose-leaf binders, thickness as necessary to accommodate contents, and sized to receive 8-1/2-by-11-inch (215-by-280-mm) paper.
2. Provide heavy paper dividers with plastic-covered tabs for each separate warranty. Mark tab to identify the product or installation. Provide a typed description of the product or installation, including the name of the product and the name, address, and telephone number of Installer.
3. Identify each binder on the front and spine with the typed or printed title "WARRANTIES," Project name, and name of Contractor.
D. Provide additional copies of each warranty to include in operation and maintenance manuals.
PART 2 - PRODUCTS
2.1 MATERIALS
A. Cleaning Agents: Use cleaning materials and agents recommended by manufacturer or fabricator of the surface to be cleaned. Do not use cleaning agents that are potentially hazardous to health or property or that might damage finished surfaces.
PART 3 - EXECUTION
3.1 FINAL CLEANING
A. General: Provide final cleaning. Conduct cleaning and waste-removal operations to comply with local laws and ordinances and Federal and local environmental and antipollution regulations.
B. Cleaning: Employ experienced workers or professional cleaners for final cleaning.
Clean each surface or unit to condition expected in an average commercial building cleaning and maintenance program. Comply with manufacturer's written instructions.
1. Complete the following cleaning operations before requesting inspection for certification of Substantial Completion for entire Project or for a portion of Project:
146
Westacre Park Expansion and Renovation Project Section 01770 September 2024 Closeout Procedures
01770-5
a. Clean Project site, yard, and grounds, in areas disturbed by construction activities, including landscape development areas, of rubbish, waste material, litter, and other foreign substances.
b. Sweep paved areas broom clean. Remove petrochemical spills, stains, and other foreign deposits.
c. Rake grounds that are neither planted nor paved to a smooth, even-textured surface.
d. Remove tools, construction equipment, machinery, and surplus material from Project site.
e. Clean exposed exterior finishes to a dirt-free condition, free of stains, films, and similar foreign substances. Avoid disturbing natural weathering of exterior surfaces. Restore reflective surfaces to their original condition. f. Remove labels that are not permanent.
g. Touch up and otherwise repair and restore marred, exposed finishes and surfaces. Replace finishes and surfaces that cannot be satisfactorily repaired or restored or that already show evidence of repair or restoration. 1) Do not paint over "UL" and similar labels, including mechanical and electrical nameplates.
h. Wipe surfaces of mechanical and electrical equipment and similar equipment. Remove excess lubrication, paint and mortar droppings, and other foreign substances.
i. Replace parts subject to unusual operating conditions. j. Leave Project clean and ready for occupancy.
C. Comply with safety standards for cleaning. Do not burn waste materials. Do not bury debris or excess materials on Owner's property. Do not discharge volatile, harmful, or dangerous materials into drainage systems. Remove waste materials from Project site and dispose of lawfully.
END OF SECTION
147
Westacre Park Expansion and Renovation Project Section 01780 April 2024 Closeout Submittals
01780-1
SECTION 01780
CLOSEOUT SUBMITTALS
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Project Record Documents.
B. Operation and Maintenance Data.
C. Training.
D. Warranties and bonds.
1.02 RELATED SECTIONS
A. Section 01300 - Administrative Requirements: Submittals procedures, shop drawings, product data, and samples.
B. Individual Product Sections: Specific requirements for operation and maintenance data.
C. Individual Product Sections: Warranties required for specific products or Work.
1.03 SUBMITTALS
A. Project Record Documents: Submit documents to the Owner with claim for final Application for Payment.
B. Operation and Maintenance Data:
1. Submit two copies of preliminary draft or proposed formats and outlines of contents before start of Work. Melton Design Group will review draft and return one copy with comments.
2. For equipment, or component parts of equipment put into service during construction and operated by the Owner, submit completed documents within ten days after acceptance.
3. Submit 1 copy of completed documents 15 days prior to final inspection. This copy will be reviewed and returned after final inspection, with Melton Design Group comments. Revise content of all document sets as required prior to final submission.
4. Submit two sets of revised final documents in final form within 10 days after final inspection.
C. Warranties and Bonds:
1. For equipment or component parts of equipment put into service during 148
Westacre Park Expansion and Renovation Project Section 01780 April 2024 Closeout Submittals
01780-2
construction with the District’s permission, submit documents within ten days after acceptance.
2. Make other submittals within ten days after Date of Substantial Completion, prior to final Application for Payment.
3. For items of Work for which acceptance is delayed beyond Date of Substantial Completion, submit within ten days after acceptance, listing the date of acceptance as the beginning of the warranty period.
PART 2 PRODUCTS
NOT USED
PART 3 EXECUTION
3.01 PROJECT RECORD DOCUMENTS
A. Maintain on site one set of the following record documents; record actual revisions to the Work:
1. Drawings.
2. Specifications.
3. Addenda.
4. Change Orders and other modifications to the Contract.
5. Reviewed shop drawings, product data, and samples.
6. Manufacturer's instruction for assembly, installation, and adjusting.
B. Ensure entries are complete and accurate, enabling future reference by the District.
C. Store record documents separate from documents used for construction.
D. Record information concurrent with construction progress.
E. Specifications: Legibly mark and record at each product section description of actual products installed, including the following:
1. Manufacturer's name and product model and number.
2. Product substitutions or alternates utilized.
3. Changes made by Addenda and modifications.
F. Record Drawings and Shop Drawings: Legibly mark each item to record actual construction including:
1. Measured horizontal and vertical locations of underground utilities, irrigation and appurtenances, referenced to two permanent surface improvements.
2. Field changes of dimension and detail.
3. Details not on original Contract drawings.
149
Westacre Park Expansion and Renovation Project Section 01780 April 2024 Closeout Submittals
01780-3
3.02OPERATION AND MAINTENANCE DATA
A. For Each Product or System: List names, addresses and telephone numbers of Subcontractors and suppliers, including local source of supplies and replacement parts.
B. Product Data: Mark each sheet to dearly identify specific products and component parts, and data applicable to installation. Delete inapplicable information.
C. Drawings: Supplement product data to illustrate relations of component parts of equipment and systems, to show control and flow diagrams. Do not use Project Record Documents as maintenance drawings.
D. Typed Text: As required to supplement product data. Provide logical sequence of instructions for each procedure, incorporating manufacturer's instructions.
3.03 OPERATION AND MAINTENANCE DATA FOR MATERIALS AND FINISHES A. For Each Product, Applied Material, and Finish:
1. Product data, with catalog number, size, composition, and color and texture designations.
2. Information for re-ordering custom manufactured products.
B. Instructions for Care and Maintenance: Manufacturer's recommendations for cleaning agents and methods, precautions against detrimental cleaning agents and methods, and recommended schedule for cleaning and maintenance.
C. Moisture protection and weather-exposed products: Include product data listing applicable reference standards, chemical composition, and details of installation. Provide recommendations for inspections, maintenance, and repair.
3.04 OPERATION AND MAINTENANCE DATA FOR EQUIPMENT AND SYSTEMS A. For Each Item of Equipment and Each System:
1. Description of unit or system, and component parts.
2. Identify function, normal operating characteristics, and limiting conditions.
3. Include performance curves, with engineering data and tests.
4. Complete nomenclature and model number of replaceable parts.
B. Operating Procedures: Include start-up, break-in, and routine normal operating instructions and sequences. Include regulation, control, stopping, shutdown, and emergency instructions. Include summer, winter, and any special operating instructions.
C. Maintenance Requirements: Include routine procedures and guide for preventative maintenance and troubleshooting; disassembly, repair, and reassembly instructions; and alignment, adjusting, balancing, and checking instructions. 150
Westacre Park Expansion and Renovation Project Section 01780 April 2024 Closeout Submittals
01780-4
D. Provide servicing and lubrication schedule, and list of lubricants required.
E. Include manufacturer's printed operation and maintenance instructions.
F. Include sequence of operation by controls manufacturer.
G. Provide original manufacturer's parts list, illustrations, assembly drawings, and diagrams required for maintenance.
H. Additional Requirements: As specified in individual product specification sections.
3.05 OPERATION AND MAINTENANCE MANUALS
A. Prepare instructions and data by personnel experienced in maintenance and operation of described products.
B. Prepare data in the form of an instructional manual.
C. Binders: Commercial quality, 8-1/2 x 11 inch three D side ring binders with durable plastic covers; 2 inch maximum ring size. When multiple binders are used, correlate data into related consistent groupings.
D. Cover: Identify each binder with typed or printed title OPERATION AND MAINTENANCE INSTRUCTIONS; identify title of Project; identify subject matter of contents.
E. Provide tabbed dividers for each separate product and system, with typed description of product and major component parts of equipment.
F. Text: Manufacturer's printed data, or typewritten data on 24-pound paper.
Drawings: Provide with reinforced punched binder tab. Bind in with text; fold larger drawings to size of text pages.
3.06 TRAINING
A. Provide training and orientation of District’s operating staff in proper care and operation of equipment, systems and controls.
B. Submit three copies of certificate, signed by District's Representative, attesting to their having been instructed.
3.07 WARRANTIES AND BONDS
A. Obtain warranties and bonds, executed in duplicate by responsible Subcontractors, suppliers, and manufacturers, within ten days after completion of the applicable item of work. Except for items put into use with the District’s permission, leave date of beginning of time of warranty until the Date of Substantial completion is determined. 151
Westacre Park Expansion and Renovation Project Section 01780 April 2024 Closeout Submittals
01780-5
B. Verify that documents are in proper form, contain full information, and are notarized.
C. Co-execute submittals when required.
D. Retain warranties and bonds until time specified for submittal.
END OF SECTION
152
Westacre Park Expansion and Renovation Project Section 01781 September 2024 Project Record Documents
01781-1
SECTION 01781
PROJECT RECORD DOCUMENTS
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification Sections, apply to this Section.
1.2 SUMMARY
A. This Section includes administrative and procedural requirements for Project Record Documents, including the following:
1. Record Drawings.
2. Record Specifications.
3. Record Product Data.
B. Related Sections include the following:
1. Division 1 Section "Closeout Procedures" for general closeout procedures.
2. Division 1 Section "Operation and Maintenance Data" for operation and maintenance manual requirements.
3. Divisions 2 through 16 Sections for specific requirements for Project Record Documents of the Work in those Sections.
1.3 SUBMITTALS
A. Record Drawings: Comply with the following:
1. Number of Copies: Submit one set(s) of marked-up Record Prints.
B. Record Specifications: Submit one copy of Project's Specifications, including addenda and contract modifications.
C. Record Product Data: Submit one copy of each Product Data submittal.
1. Where Record Product Data is required as part of operation and maintenance manuals, submit marked-up Product Data as an insert in manual instead of submittal as Record Product Data.
153
Westacre Park Expansion and Renovation Project Section 01781 September 2024 Project Record Documents
01781-2
PART 2 - PRODUCTS
2.1 RECORD DRAWINGS
A. Record Prints: Maintain one set of blue- or black-line white prints of the Contract Drawings and Shop Drawings.
1. Preparation: Mark Record Prints to show the actual installation where installation varies from that shown originally. Require individual or entity who obtained record data, whether individual or entity is Installer, subcontractor, or similar entity, to prepare the marked-up Record Prints.
a. Give particular attention to information on concealed elements that would be difficult to identify or measure and record later.
b. Accurately record information in an understandable drawing technique. c. Record data as soon as possible after obtaining it. Record and check the markup before enclosing concealed installations.
2. Content: Types of items requiring marking include, but are not limited to, the following:
a. Dimensional changes to Drawings.
b. Revisions to details shown on Drawings.
c. Depths of foundations below first floor.
d. Locations and depths of underground utilities.
e. Revisions to routing of piping and conduits.
f. Revisions to electrical circuitry.
g. Actual equipment locations.
h. Locations of concealed internal utilities.
i. Changes made by Change Order or Construction Work Change Directive. j. Changes made following Landscape Architect's written orders. k. Details not on the original Contract Drawings.
l. Field records for variable and concealed conditions. m. Record information on the Work that is shown only schematically.
3. Mark the Contract Drawings or Shop Drawings, whichever is most capable of showing actual physical conditions, completely and accurately. If Shop Drawings are marked, show cross-reference on the Contract Drawings.
4. Mark record sets with erasable, red-colored pencil. Use other colors to distinguish between changes for different categories of the Work at same location.
5. Mark important additional information that was either shown schematically or omitted from original Drawings.
6. Note Construction Change Directive numbers, alternate numbers, Change Order numbers, and similar identification, where applicable.
154
Westacre Park Expansion and Renovation Project Section 01781 September 2024 Project Record Documents
01781-3
B. Record Transparencies: Immediately before inspection for Certificate of Substantial Completion, review marked-up Record Prints with Construction Inspector. When authorized, prepare a full set of corrected transparencies of the Contract Drawings and Shop Drawings.
1. Incorporate changes and additional information previously marked on Record Prints. Erase, redraw, and add details and notations where applicable.
2. Refer instances of uncertainty to Owner for resolution.
3. Owner will furnish Contractor one set of transparencies of the Contract Drawings for use in recording information.
2.2 RECORD SPECIFICATIONS
A. Preparation: Mark Specifications to indicate the actual product installation where installation varies from that indicated in Specifications, addenda, and contract modifications.
1. Give particular attention to information on concealed products and installations that cannot be readily identified and recorded later.
2. Mark copy with the proprietary name and model number of products, materials, and equipment furnished, including substitutions and product options selected.
3. Record the name of manufacturer, supplier, Installer, and other information necessary to provide a record of selections made.
4. For each principal product, indicate whether Record Product Data has been submitted in operation and maintenance manuals instead of submitted as Record Product Data.
5. Note related Change Orders, Record Product Data, and Record Drawings where applicable.
2.3 RECORD PRODUCT DATA
A. Preparation: Mark Product Data to indicate the actual product installation where installation varies substantially from that indicated in Product Data submittal.
1. Give particular attention to information on concealed products and installations that cannot be readily identified and recorded later.
2. Include significant changes in the product delivered to Project site and changes in manufacturer's written instructions for installation.
3. Note related Change Orders, Record Specifications, and Record Drawings where applicable.
155
Westacre Park Expansion and Renovation Project Section 01781 September 2024 Project Record Documents
01781-4
PART 3 - EXECUTION
3.1 RECORDING AND MAINTENANCE
A. Recording: Maintain one copy of each submittal during the construction period for Project Record Document purposes. Post changes and modifications to Project Record Documents as they occur; do not wait until the end of Project.
B. Maintenance of Record Documents and Samples: Store Record Documents and Samples in the field office apart from the Contract Documents used for construction.
Do not use Project Record Documents for construction purposes. Maintain Record Documents in good order and in a clean, dry, legible condition, protected from deterioration and loss. Provide access to Project Record Documents for Owner’s reference during normal working hours.
END OF SECTION
156
Westacre Park Expansion and Renovation Project Section 01782 April 2024 Operations and Maintenance Data
01782-1
SECTION 01782
OPERATION AND MAINTENANCE DATA
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification Sections, apply to this Section.
1.2 SUMMARY
A. This Section includes administrative and procedural requirements for preparing operation and maintenance manuals, including the following:
1. Operation and maintenance documentation directory.
2. Emergency manuals.
3. Operation manuals for systems, subsystems, and equipment.
4. Maintenance manuals for the care and maintenance of products, materials, and finishes systems and equipment.
B. Related Sections include the following:
1. Division 1 Section "Administrative Requirements” for submitting copies of submittals for operation and maintenance manuals.
2. Division 1 Section "Closeout Procedures" for submitting operation and maintenance manuals.
3. Divisions 2 through 16 Sections for specific operation and maintenance manual requirements for the Work in those Sections.
1.3 DEFINITIONS
A. System: An organized collection of parts, equipment, or subsystems united by regular interaction.
B. Subsystem: A portion of a system with characteristics similar to a system. 157
Westacre Park Expansion and Renovation Project Section 01782 April 2024 Operations and Maintenance Data
01782-2
1.4 SUBMITTALS
A. Initial Submittal: Submit 2 draft copies of each manual at least 15 days before requesting inspection for Substantial Completion. Include a complete operation and maintenance directory. Landscape Architect will return one copy of draft and mark whether general scope and content of manual are acceptable.
B. Final Submittal: Submit one copy of each manual in final form at least 15 days before final inspection. Landscape Architect will return copy with comments within 15 days after final inspection.
1. Correct or modify each manual to comply with Landscape Architect's comments. Submit 3 copies of each corrected manual within 15 days of receipt of Landscape Architect's comments.
1.5 COORDINATION
A. Where operation and maintenance documentation includes information on installations by more than one factory-authorized service representative, assemble and coordinate information furnished by representatives and prepare manuals.
PART 2 - PRODUCTS
2.1 OPERATION AND MAINTENANCE DOCUMENTATION DIRECTORY
A. Organization: Include a section in the directory for each of the following:
1. List of documents.
2. List of systems.
3. List of equipment.
4. Table of contents.
B. List of Systems and Subsystems: List systems alphabetically. Include references to operation and maintenance manuals that contain information about each system.
C. List of Equipment: List equipment for each system, organized alphabetically by system. For pieces of equipment not part of system, list alphabetically in separate list.
D. Tables of Contents: Include a table of contents for each emergency, operation, and maintenance manual.
E. Identification: In the documentation directory and in each operation and maintenance manual, identify each system, subsystem, and piece of equipment with 158
Westacre Park Expansion and Renovation Project Section 01782 April 2024 Operations and Maintenance Data
01782-3
same designation used in the Contract Documents. If no designation exists, assign a designation according to ASHRAE Guideline 4, "Preparation of Operating and Maintenance Documentation for Building Systems."
2.2 MANUALS, GENERAL
A. Organization: Unless otherwise indicated, organize each manual into a separate section for each system and subsystem, and a separate section for each piece of equipment not part of a system. Each manual shall contain the following materials, in the order listed:
1. Title page.
2. Table of contents.
3. Manual contents.
B. Title Page: Enclose title page in transparent plastic sleeve. Include the following information:
1. Subject matter included in manual.
2. Name and address of Project.
3. Name and address of Owner.
4. Date of submittal.
5. Name, address, and telephone number of Contractor.
6. Name and address of Landscape Architect.
7. Cross-reference to related systems in other operation and maintenance manuals.
C. Table of Contents: List each product included in manual, identified by product name, indexed to the content of the volume, and cross-referenced to Specification Section number in Project Manual.
1. If operation or maintenance documentation requires more than one volume to accommodate data, include comprehensive table of contents for all volumes in each volume of the set.
D. Manual Contents: Organize into sets of manageable size. Arrange contents alphabetically by system, subsystem, and equipment. If possible, assemble instructions for subsystems, equipment, and components of one system into a single binder.
1. Binders: Heavy-duty, 3-ring, vinyl-covered, loose-leaf binders, in thickness necessary to accommodate contents, sized to hold 8-1/2-by-11-inch (215-by280-mm) paper; with clear plastic sleeve on spine to hold label describing contents and with pockets inside covers to hold folded oversize sheets. a. If two or more binders are necessary to accommodate data of a system, organize data in each binder into groupings by subsystem and related 159
Westacre Park Expansion and Renovation Project Section 01782 April 2024 Operations and Maintenance Data
01782-4
components. Cross-reference other binders if necessary to provide essential information for proper operation or maintenance of equipment or system. b. Identify each binder on front and spine, with printed title "OPERATION AND MAINTENANCE MANUAL," Project title or name, and subject matter of contents. Indicate volume number for multiple-volume sets.
2. Dividers: Heavy-paper dividers with plastic-covered tabs for each section.
Mark each tab to indicate contents. Include typed list of products and major components of equipment included in the section on each divider, crossreferenced to Specification Section number and title of Project Manual.
3. Protective Plastic Sleeves: Transparent plastic sleeves designed to enclose diagnostic software diskettes for computerized electronic equipment.
4. Supplementary Text: Prepared on 8-1/2-by-11-inch (215-by-280-mm) white bond paper.
5. Drawings: Attach reinforced, punched binder tabs on drawings and bind with text.
a. If oversize drawings are necessary, fold drawings to same size as text pages and use as foldouts.
b. If drawings are too large to be used as foldouts, fold and place drawings in labeled envelopes and bind envelopes in rear of manual. At appropriate locations in manual, insert typewritten pages indicating drawing titles, descriptions of contents, and drawing locations.
2.3 EMERGENCY MANUALS
A. Content: Organize manual into a separate section for each of the following:
1. Type of emergency.
2. Emergency instructions.
3. Emergency procedures.
B. Type of Emergency: Where applicable for each type of emergency indicated below, include instructions and procedures for each system, subsystem, piece of equipment, and component:
1. Fire.
2. Flood.
3. Gas leak.
4. Water leak.
5. Power failure.
6. Water outage.
7. System, subsystem, or equipment failure.
8. Chemical release or spill.
160
Westacre Park Expansion and Renovation Project Section 01782 April 2024 Operations and Maintenance Data
01782-5
C. Emergency Instructions: Describe and explain warnings, trouble indications, error messages, and similar codes and signals. Include responsibilities of Owner's operating personnel for notification of Installer, supplier, and manufacturer to maintain warranties.
D. Emergency Procedures: Include the following, as applicable:
1. Instructions on stopping.
2. Shutdown instructions for each type of emergency.
3. Operating instructions for conditions outside normal operating limits.
4. Required sequences for electric or electronic systems.
5. Special operating instructions and procedures.
2.4 OPERATION MANUALS
A. Content: In addition to requirements in this Section, include operation data required in individual Specification Sections and the following information:
1. System, subsystem, and equipment descriptions.
2. Performance and design criteria if Contractor is delegated design responsibility.
3. Operating standards.
4. Operating procedures.
5. Operating logs.
6. Wiring diagrams.
7. Control diagrams.
8. Piped system diagrams.
9. Precautions against improper use.
10. License requirements including inspection and renewal dates.
B. Descriptions: Include the following:
1. Product name and model number.
2. Manufacturer's name.
3. Equipment identification with serial number of each component.
4. Equipment function.
5. Operating characteristics.
6. Limiting conditions.
7. Performance curves.
8. Engineering data and tests.
9. Complete nomenclature and number of replacement parts.
C. Operating Procedures: Include the following, as applicable:
1. Startup procedures.
2. Equipment or system break-in procedures.
161
Westacre Park Expansion and Renovation Project Section 01782 April 2024 Operations and Maintenance Data
01782-6
3. Routine and normal operating instructions.
4. Regulation and control procedures.
5. Instructions on stopping.
6. Normal shutdown instructions.
7. Seasonal and weekend operating instructions.
8. Required sequences for electric or electronic systems.
9. Special operating instructions and procedures.
D. Systems and Equipment Controls: Describe the sequence of operation, and diagram controls as installed.
E. Piped Systems: Diagram piping as installed, and identify color-coding where required for identification.
2.5 PRODUCT MAINTENANCE MANUAL
A. Content: Organize manual into a separate section for each product, material, and finish. Include source information, product information, maintenance procedures, repair materials and sources, and warranties and bonds, as described below.
B. Source Information: List each product included in manual, identified by product name and arranged to match manual's table of contents. For each product, list name, address, and telephone number of Installer or supplier and maintenance service agent, and cross-reference Specification Section number and title in Project Manual.
C. Product Information: Include the following, as applicable:
1. Product name and model number.
2. Manufacturer's name.
3. Color, pattern, and texture.
4. Material and chemical composition.
5. Reordering information for specially manufactured products.
D. Maintenance Procedures: Include manufacturer's written recommendations and the following:
1. Inspection procedures.
2. Types of cleaning agents to be used and methods of cleaning.
3. List of cleaning agents and methods of cleaning detrimental to product.
4. Schedule for routine cleaning and maintenance.
5. Repair instructions.
E. Repair Materials and Sources: Include lists of materials and local sources of materials and related services.
162
Westacre Park Expansion and Renovation Project Section 01782 April 2024 Operations and Maintenance Data
01782-7
F. Warranties and Bonds: Include copies of warranties and bonds and lists of circumstances and conditions that would affect validity of warranties or bonds.
1. Include procedures to follow and required notifications for warranty claims.
2.6 SYSTEMS AND EQUIPMENT MAINTENANCE MANUAL
A. Content: For each system, subsystem, and piece of equipment not part of a system, include source information, manufacturers' maintenance documentation, maintenance procedures, maintenance and service schedules, spare parts list and source information, maintenance service contracts, and warranty and bond information, as described below.
B. Source Information: List each system, subsystem, and piece of equipment included in manual, identified by product name and arranged to match manual's table of contents. For each product, list name, address, and telephone number of Installer or supplier and maintenance service agent, and cross-reference Specification Section number and title in Project Manual.
C. Manufacturers' Maintenance Documentation: Manufacturers' maintenance documentation including the following information for each component part or piece of equipment:
1. Standard printed maintenance instructions and bulletins.
2. Drawings, diagrams, and instructions required for maintenance, including disassembly and component removal, replacement, and assembly.
3. Identification and nomenclature of parts and components.
4. List of items recommended to be stocked as spare parts.
D. Maintenance Procedures: Include the following information and items that detail essential maintenance procedures:
1. Test and inspection instructions.
2. Troubleshooting guide.
3. Precautions against improper maintenance.
4. Disassembly; component removal, repair, and replacement; and reassembly instructions.
5. Aligning, adjusting, and checking instructions.
6. Demonstration and training videotape, if available.
E. Maintenance and Service Schedules: Include service and lubrication requirements, list of required lubricants for equipment, and separate schedules for preventive and routine maintenance and service with standard time allotment.
1. Scheduled Maintenance and Service: Tabulate actions for daily, weekly, monthly, quarterly, semiannual, and annual frequencies. 163
Westacre Park Expansion and Renovation Project Section 01782 April 2024 Operations and Maintenance Data
01782-8
2. Maintenance and Service Record: Include manufacturers' forms for recording maintenance.
F. Spare Parts List and Source Information: Include lists of replacement and repair parts, with parts identified and cross-referenced to manufacturers' maintenance documentation and local sources of maintenance materials and related services.
G. Maintenance Service Contracts: Include copies of maintenance agreements with name and telephone number of service agent.
H. Warranties and Bonds: Include copies of warranties and bonds and lists of circumstances and conditions that would affect validity of warranties or bonds.
1. Include procedures to follow and required notifications for warranty claims.
PART 3 - EXECUTION
3.1 MANUAL PREPARATION
A. Operation and Maintenance Documentation Directory: Prepare a separate manual that provides an organized reference to emergency, operation, and maintenance manuals.
B. Emergency Manual: Assemble a complete set of emergency information indicating procedures for use by emergency personnel and by Owner's operating personnel for types of emergencies indicated.
C. Product Maintenance Manual: Assemble a complete set of maintenance data indicating care and maintenance of each product, material, and finish incorporated into the Work.
D. Operation and Maintenance Manuals: Assemble a complete set of operation and maintenance data indicating operation and maintenance of each system, subsystem, and piece of equipment not part of a system.
1. Engage a factory-authorized service representative to assemble and prepare information for each system, subsystem, and piece of equipment not part of a system.
2. Prepare a separate manual for each system and subsystem, in the form of an instructional manual for use by Owner's operating personnel.
E. Manufacturers' Data: Where manuals contain manufacturers' standard printed data, include only sheets pertinent to product or component installed. Mark each sheet to identify each product or component incorporated into the Work. If data include more than one item in a tabular format, identify each item using appropriate 164
Westacre Park Expansion and Renovation Project Section 01782 April 2024 Operations and Maintenance Data
01782-9
references from the Contract Documents. Identify data applicable to the Work and delete references to information not applicable.
1. Prepare supplementary text if manufacturers' standard printed data are not available and where the information is necessary for proper operation and maintenance of equipment or systems.
F. Drawings: Prepare drawings supplementing manufacturers' printed data to illustrate the relationship of component parts of equipment and systems and to illustrate control sequence and flow diagrams. Coordinate these drawings with information contained in Record Drawings to ensure correct illustration of completed installation.
1. Do not use original Project Record Documents as part of operation and maintenance manuals.
2. Comply with requirements of newly prepared Record Drawings in Division 1 Section "Project Record Documents."
G. Comply with Division 1 Section "Closeout Procedures" for schedule for submitting operation and maintenance documentation.
END OF SECTION
165
Westacre Park Expansion and Renovation Project Section 02100 September 2024 Demolition
02100-1
SECTION 02100
DEMOLITION
PART 1 GENERAL
1.01 DESCRIPTION
A. Work includes, but is not limited to the following:
1. The Contractor shall provide all equipment, tools, materials, and labor necessary to complete the Work.
2. Completely coordinate with Work of all other trades.
3. Provide protection for all existing objects or conditions designated on the Drawings to remain on the site or return to the Owner.
4. Provide protection to prevent injury or damage to persons or adjacent properties.
5. Remove and dispose of demolished materials from the site as indicated on the drawings.
6. Comply with applicable codes and ordinances concerning demolition operations.
B. Definition: The term "demolition", as used herein, includes the removal and disposal of all existing objects (except for those objects designated to remain) down to the existing grade level or subgrade level to the extent indicated or as otherwise required to permit new construction and all other Work as described in this Section necessary to complete all Demolition Work.
C. Use of explosives will not be permitted.
1.02 PERMITS, ORDINANCES, ETC.
Procure and pay for all necessary permits or certificates required to complete the Demolition Work specified. Make any and all required notifications and comply with all applicable Federal, State, and Local ordinances concerning demolition operations.
1.03 JOB CONDITIONS
Visit the site and examine the existing conditions and observe the conditions under which the Work is to be performed. Notify the Landscape Architect of unsatisfactory conditions and do not proceed with the Work until unsatisfactory conditions have been 166
Westacre Park Expansion and Renovation Project Section 02100 September 2024 Demolition
02100-2
, construction joint, cold joint or edge, move the concrete to the joint or edge.
The edges of existing concrete pavement adjacent to trenches, where damaged subsequent to saw cutting of the pavement, saw cut again to neat straight lines for the purpose of removing the damaged pavement areas. Such saw cuts shall be either parallel to the original saw cuts or shall be cut on an angle which departs from corrected in a manner acceptable to the Landscape Architect. Note all conditions as to character and extent of Work involved.
1.04 PROTECTION
A. Execute all Demolition Work in an orderly and careful manner with due consideration for any existing condition designated to remain. Provide protection to preserve existing items indicated to remain and to prevent injury or damage to persons or adjacent properties.
B. Use all means necessary to protect existing conditions designated to remain and adjacent properties. Avoid any encroachment on adjacent properties. In the event of damage or loss to any existing condition designated to remain or adjacent properties, immediately make all repairs and replacements necessary to the approval of the Owner at no additional cost to Owner.
C. Do not interfere with the normal traffic on roads, streets, walks, or use of adjacent properties. Provide alternate routes around closed or obstructed traffic ways as required by governing regulations.
D. Protect existing trees per plans.
1.05 CUTTING AND PATCHING
Cut existing sidewalks, roads, and curbs as required to complete Demolition Work.
Pavement shall be cut vertically along straight lines forming the edges of the Demolition Work and so as not to damage the adjacent pavement. Repair all pavement as specified in Sections of the specification covering the applicable trades.
1.06 DUST CONTROL
Use all means necessary to prevent the spread of dust during performance of the Work of this Section; thoroughly moisten all surfaces as required to prevent dust being a nuisance to the public, neighbors, and concurrent performance of other work on the site.
PART 2 - PRODUCTS
2.01 OTHER MATERIALS
167
Westacre Park Expansion and Renovation Project Section 02100 September 2024 Demolition
02100-3
All other materials, not specifically described but required for proper completion of the Work of this Section, shall be as selected by the Contractor subject to approval by the Landscape Architect.
PART 3 - EXECUTION
3.01 PREPARATION
A. Notification
Notify the Landscape Architect at lease two (2) full working days prior to commencing the Work of this Section.
B. Site Observation
1. Prior to all Work of this Section, carefully observe the entire site for all objects designated to be removed and to be preserved.
2. Contact the Underground Service Alert (U.S.A.) at 1-800-227-2600 to stake and mark the location of all existing utilities prior to the beginning of Work.
3. Locate all existing utility lines indicated on the Drawings to remain, and determine the requirements for their protection.
4. Locate, if any, all existing utility line indicated on the Drawings to be disconnected and capped, and determine all requirements for disconnecting and capping.
C. Clarification
1. The Drawings do not purport to show all objects existing on the site.
2. Before commencing the Work of this Section, verify with the Landscape Architect all objects to be removed and all objects to preserve.
D. Scheduling
1. Schedule all Work in a careful manner with all necessary consideration for adjacent properties and the general public.
2. Avoid interference with the use of, and passage to and from, adjacent properties.
3. Conduct operations so as not to interfere with the use of adjacent roads, streets, drives, walks, service lines, etc.
168
Westacre Park Expansion and Renovation Project Section 02100 September 2024 Demolition
02100-4
E. Disconnection of Utilities
Before starting site construction, arrange for the disconnection of all utility lines designated to be removed, relocated, or capped with the appropriate utility company. Utility company services for this Work shall be paid for by the Contractor.
F. Protection of Utilities
Retain and protect in operating condition all active utilities traversing the site designated to remain.
3.02 DEMOLITION OF OBJECTS
A. Remove and dispose of all existing objects (except for those objects designated to remain) down to existing grade level or subgrade level to the extent indicated or as otherwise required to permit new construction.
B. Tree Demolition – remove all of tree, tree trunk and roots, including below grade.
3.03 REQUIREMENTS FOR REMOVAL OF ASPHALT AND CONCRETE PAVEMENT A. Remove asphalt pavement to neatly saw edges. Make saw cuts to a minimum dept of one (1) inch below the bottom surface of the pavement. Where only the surface of existing asphalt pavement is to be removed, obtain approval of method from the Landscape Architect, and provide a minimum laying depth of one (1) inch of new pavement material at the join line. Where asphalt pavement adjoins a trench, trim the edges adjacent to the trench to neat straight lines before resurfacing to insure that all areas to be resurfaced are accessible to the rollers used to compact the subgrade or paving materials.
B. Remove concrete pavement to neatly sawed edges. Make saw cuts a minimum depth of one (1) inch below the bottom surface of the pavement. If a saw cut in concrete pavement falls within three (3) feet of an expansion jointthe original saw cut not more than one (1) inch in each six (6) inches.
C. Concrete curbs, gutters, cross gutters, driveways and walks: Remove concrete to neatly sawed edges, with saw cuts made to a minimum depth of one and one-half (I -1 /2) inches. Concrete sidewalk of driveway to be removed shall be neatly sawed in straight lines, either parallel to the curb or at right angles to the alignment of the sidewalk. No section to be replaced shall be smaller than thirty (30) inches in either length or width. If the saw cut in sidewalk or driveway fall within thirty (30) inches of a construction joint, expansion joint, cold joint or edge, the concrete shall be 169
Westacre Park Expansion and Renovation Project Section 02100 September 2024 Demolition
02100-5
removed to the joint or edge, except that where the saw cut would fall within twelve (12) inches of a score mark, the saw cut shall be made in and along the score mark.
Curb and gutter shall be sawed to a depth of one (1) inch below the bottom surface in a neat line at right angles to the curb face.
3.04 BACKFILL AND COMPACTION
All excavations left by the Demolition Work shall be filled and compacted to make the surface at these points conform in contour and density to that of the surrounding ground, and as specified per plan and these special provisions.
3.05 DISPOSAL OF DEBRIS
A. All material removed under this Contract, which is not to be salvaged or reused, or otherwise specified on the Plan shall become the property of the Contractor and be promptly disposed of. It shall be the responsibility of the Contractor to procure dumping facilities or other means of disposal for all items specified to be removed from the site. Storing or permitting refuse to accumulate on the site will not be permitted.
B. Disposal of all materials from the site shall be done in a lawful manner. Transport all refuse materials from the site without spilling on the streets.
C. Burning of refuse material on the site will not be permitted.
END OF SECTION
170
Westacre Park Expansion and Renovation Project Section 02230 September 2024 Site Clearing
02230-1
SECTION 02230
SITE CLEARING
PART 1 GENERAL
1.01 SCOPE OF WORK
A. Furnish all labor, material, equipment and services necessary to provide all work, complete in place, as indicated on Drawings and specified herein.
Work specified in this Section includes, but is not limited to the following:
1. Site preparation.
2. Tree protection.
3. Restore damaged improvementsto original condition.
4. Existing Utilities.
5. Clearing and Grubbing.
6. Removing topsoil.
7. Removing existing improvements.
8. Backfill requirements.
9. Disposing of objectionable material.
B. Related Work Specified in Other Sections
1. SECTION 02300 – EARTHWORK.
C. Related Documents
3. Section 31 1000 – Site Clearing.
D. Definitions
1. ANSI: American National Standards Institute.
171
Westacre Park Expansion and Renovation Project Section 02230 September 2024 Site Clearing
02230-2
2. CAL-OSHA: California Occupational Safety and Health Administration.
3. Topsoil: Natural or cultivated surface-soil layer containing organic matter and sand, silt, and clay particles; friable, pervious, and black or a darker shade of brown, gray, or red than underlying subsoil; reasonably free of subsoil, clay lumps, gravel, and other objects more than 2-inches in diameter; and free of weeds, roots, and other deleterious materials.
1.02 SUBMITTALS
A. Follow Submittal procedure outlined in Section 01330 – Submittal Procedures.
B. Project Record Documents: Record actual locations of pipe mains, valve, connections and invert elevations. Identify and describe unexpected variations to subsoil conditions or discovery of uncharted utilities.
1.03 QUALITY ASSURANCE
A. Do not remove or prune trees without written approval from Owner.
B. Prune to the standards of the International Society of Arborists and to ANSI 300.
1.04 PROJECT CONDITIONS
A. Except for materialsindicated to be stockpiled or to remain the Owner’s property, cleared materials are the Contractor's property. Remove cleared materials from site and dispose of in lawful manner.
B. Unidentified Materials; if unidentified materials are discovered, including hazardous materials that will require additional removal other than is required by the Contract Documents, immediately report the discovery to the Owner.
C. If necessary, the Owner will arrange for any testing or analysis of the discovered materials and will provide instructions regarding the removal and disposal of the unidentified materials.
PART 2 PRODUCTS
2.01 SOIL MATERIALS
A. Backfill excavations resulting from demolition operations with on-site or import materials conforming to structural backfill defined in Section 02300 – Earthwork.
PART 3 EXECUTION
3.01 SITE PREPARATION
A. Protect and maintain benchmarks and survey control points during construction. 172
Westacre Park Expansion and Renovation Project Section 02230 September 2024 Site Clearing
02230-3
B. Locate and clearly flag trees and vegetation to remain or to be relocated.
C. Protect existing site improvementsto remain during construction.
D. Verify existing conditions at the site and include all work evident by site inspection whether or not shown on the Drawings.
3.02 TREE PROTECTION
A. Erect and maintain temporary fence around drip line of individual trees or around perimeter drip line of groups of trees to remain. Remove fence when construction is complete.
B. Do not store construction materials, debris, or excavated material within drip line of remaining trees.
C. Do not permit vehicles or equipment within drip line of remaining trees.
D. Do not excavate within drip line of remaining trees, unless otherwise indicated.
E. Where excavation for new construction is required within drip line of trees, hand clear and excavate to minimize damage to root systems. Use narrow-tine spading forks, comb soil to expose roots, and cleanly cut roots as close to excavation edge as possible.
1. Cover exposed roots with burlap and water regularly.
2. Temporarily support and protect roots from damage until they are permanently relocated and covered with soil.
3. Coat cut faces of roots more than 1-1/2-inches in diameter with an emulsified asphalt or other approved coating formulated for use on damaged plant tissues.
4. Cover exposed roots with wet burlap to prevent roots from drying out. Backfill with soil as soon as possible.
F. Also see Tree Protection requirements outlined on Construction Drawings.
3.03 RESTORATION
A. Restore damaged improvementsto their original condition, as acceptable to the Owner.
B. Repair or replace trees and vegetation indicated to remain that are damaged by construction operations, as directed by the Owner.
1. Employ a qualified, licensed arborist, to submit details of proposed repairs and to repair damage to trees and shrubs.
2. Replace trees that cannot be repaired and restored to full-growth status, as 173
Westacre Park Expansion and Renovation Project Section 02230 September 2024 Site Clearing
02230-4
determined by the Owner.
3.04 UTILITIES
A. Locate, identify, disconnect, and seal or cap off utilities indicated to be removed or abandoned.
B. Arrange to shut off indicated utilities with utility companies or verify that utilities have been shut off.
C. Existing Utilities: Do not interrupt utilities serving facilities occupied by Owner or others unless authorized in writing by the Owner, and then only after arranging to provide temporary utility services according to requirements indicated.
D. Coordinate utility interruptions with utility company affected.
E. Do not proceed with utility interruptions without the permission of the Owner and utility company affected. Notify Owner and utility company affected two working days prior to utility interruptions.
F. Excavate and remove underground utilities that are indicated to be removed.
G. Securely close ends of abandoned piping with tight fitting plug or wall of concrete minimum 6-inches thick.
3.05 CLEARING AND GRUBBING
A. Clear the site and remove obstructions, shrubs, grass, and other vegetation to permit installation of new construction. Removal includes digging out stumps and obstructions and grubbing roots.
B. Remove trash, debris, logs, concrete, masonry and other waste materials.
C. Do not remove trees,shrubs, and other vegetation indicated to remain or to be relocated.
D. Completely remove stumps, roots, obstructions, and debris extending to a depth of 18- inches below subgrade.
E. Use only hand methods for grubbing within drip line of remaining trees.
F. In areas not to be further excavated, fill depressions resulting from site clearing. Place and compact satisfactory soil materials per the geotechnical investigation report.
G. Clear undergrowth and deadwood without disturbing subsoil.
3.06 TOPSOIL STRIPPING
A. Remove sod and grass before stripping topsoil.
174
Westacre Park Expansion and Renovation Project Section 02230 September 2024 Site Clearing
02230-5
B. Strip topsoil to whatever depths are encountered in a manner to prevent intermingling with underlying subsoil or other waste materials.
C. Remove trash, debris, weeds, roots, and other waste materials.
D. Stockpile topsoil materials designated to remain on site at a location approved by the Owner at a location away from edge of excavations without intermixing with subsoil.
Grade and shape stockpiles to drain surface water. Cover to prevent windblown dust.
E. Do not stockpile topsoil within drip line of remaining trees.
3.07 SITE IMPROVEMENTS
A. Remove existing above- and below-grade improvements as indicated and as necessary to facilitate new construction.
B. Remove slabs, paving, curbs, and gutters, as indicated. Where concrete slabs, curb, gutter and asphalt pavements are designated to be removed, remove bases and subbase to surface of underlying, undisturbed soil.
C. Unless the existing full-depth joints coincide with line of pavement demolition, neatly saw-cut to full depth the length of existing pavement to remain before removing existing pavement. Saw-cut faces vertically.
D. Remove driveways, curbs, gutters and sidewalks by saw cutting to full depth. If saw cut falls within 30-inches of a construction joint, expansions joint, score mark or edge, remove material to joint, mark or edge.
3.08 BACKFILL
A. Place and compact material in excavations and depressionsremaining after site clearing in conformance with Section 02300 – Earthwork.
3.09 DISPOSAL
A. Remove surplus unsuitable soil material, unsuitable topsoil, obstructions, demolished materials, and waste materials, including trash and debris, and legally dispose of them off the Owner’s property.
END OF SECTION
175
Westacre Park Expansion and Renovation Project Section 02260 September 2024 Landscape Grading
02260-1
SECTION 02260
LANDSCAPE GRADING
PART 1 - GENERAL
1.01 WORK INCLUDED
A. Provide all labor, materials services and equipment indicated on Drawings and/or herein specified to complete all Landscape Grading Work
B. Landscape grading shall consist of importing topsoil to cap turf areas, importing top soil to create landscape berming, importing top soil for tree hole back fill, ripping, establishing finish grade to conform to the contours, grades, line and shapes of rough grades established on Engineer’s plans. Work may also include loosening of compacted soils created during the course of construction.
C. Land alteration of existing topographic conditions to conform to the contours, grades, lines and shapes indicated on Engineer’s and the Owner’s plans.
D. Contractor shall furnish, place and settle all required backfill material to conform to the contours, grades, lines and shapes as indicated on the Drawings, and engineer’s plans
1.02 RELATED WORK
A. SECTION 02905 - LANDSCAPE INSTALLATION
1.03 DEFINITIONS
A. Finish grade: Finish grade: Finish grade shall mean the establishment of grades to .04 feet plus or minus.
B. Grading intent: Spot elevations (grades) and contours are indicated based on the best available data. Landscape Architect’s Drawings are referenced to provide site grading data. The intent is to maintain constant slopes between spot elevations. If a spot elevation is determined to be in error, or the difference in elevation between points change contact the Owner immediately for field adjustments of spot elevations.
1.04 JOB CONDITIONS
A. Visit the project site and examine the existing conditions under which the Work is to be performed. Note all conditions, as to character and extent of Work involved. This may include pot holing to determine depth of bedrock
176
Westacre Park Expansion and Renovation Project Section 02260 September 2024 Landscape Grading
02260-2
1.05 EXISTING UTILITIES
A. Contractor is responsible to contact U.S.A (800-642-2444) to stake and mark the location of all existing utilities before commencing Work. Pot hole as required to determine and verify location and depth.
B. Retain and protect in operating condition all active utilities traversing the site designated to remain.
1.06 PROTECTION OF EXISTING CONDITIONS and ADJACENT PROPERTIES A. Use all means necessary to protect existing conditions designated to remain, newly constructed conditions and adjacent properties. Avoid any encroachment on adjacent properties.
B. Prevent damage to existing bench marks, pavement, utility lines. In the event of damage or loss immediately make all repairs and replacements required to the Owner's approval at no additional cost to the Owner.
1.07 QUALITY ASSURANCE
A. Finish grade shall conform to contours, grades, lines and shapes, as indicated on Landscape Architect’s Drawings, with uniform slopes between finish grades or between finish grades and existing grades.
B. Establish finish landscape grades in a continuous, uniform line, resulting in a uniform surface with no ridges, birdbaths or low spots.
C. Finish landscape grade tolerance shall be .04 feet plus or minus of final grades indicated on Drawings.
D. Slope grade away from buildings a minimum of two (2) percent in five (5) feet horizontal distance unless otherwise indicated on Drawings, or Landscape Architect’s plans.
1.08 SUBMITTALS
A. Provide one (1) cubic foot sample of import topsoil material for the Owner's approval prior to delivery to the site, but in any case, prior to placement.
B. Provide horticultural soils report of existing landscape soil after rough grade and submitted topsoil including information on soil texture, filtration rate, nutrient levels and organic matter. Include recommendation for amendment to be added to existing landscape soil and topsoil to mitigate any deficiencies. 177
Westacre Park Expansion and Renovation Project Section 02260 September 2024 Landscape Grading
02260-3
PART 2 - PRODUCTS
2.01 ONSITE MATERIAL
A. Existing onsite excavated surplus material may be acceptable fill or top soil material, if approved by the Owner or Owner’s representative and upon submittal of a horticultural soils report and possible amending of existing soil to match criteria specified in this section for import top soil. Excavated surplus material not required for fill material or top soil shall be removed and legally disposed of off site.
2.02 IMPORTED TOPSOIL MATERIAL
A. Imported topsoil material shall be of friable sandy-loam texture free of refuse, roots, heavy or stiff clays, rocks over 1” in diameter , 15% by volume rock between 1/8” and 1”, sticks, other deleterious matter.
B. Imported topsoil acidity range (Ph) shall be between 6.5 to 7.5, containing a minimum of 4% and a maximum of 25% organic matter.
C. Imported topsoil shall be free of all noxious weeds and other seeds.
D. Imported topsoil shall be amended as per soils report (refer to paragraph 1.08 B), at no additional cost to the Owner.
E. Topsoil shall be stock piled on site in an area free of rock and other deleterious materials.
Owner reserves the right to reject topsoil once placed in proper location per Part 3 if deleterious materials mixed in to topsoil.
PART 3 - EXECUTION
3.01 GENERAL
A. Conduct work in an orderly manner. Dirt shall not be permitted to accumulate on streets or sidewalks nor to be washed into storm drains.
B. Use all means required to prevent the erosion of freshly graded areas during construction and until such a time as proposed hard surfaces and landscaping have been constructed.
C. Excess on site material after material has been used to bring site to finished grade shall be removed and legally disposed of off site.
D. If there is not enough site material to bring site to grade, contractor shall import topsoil. 178
Westacre Park Expansion and Renovation Project Section 02260 September 2024 Landscape Grading
02260-4
3.02 RIPPING
A. If, during the course of construction, landscape areas become compacted to greater than 90% relative density, landscape areas with the exception of areas beneath the canopies of existing trees shall be ripped and cross ripped to a depth of 12”.
B. Rip and cross rip to a depth of 6 inches all areas exposed by engineering cut operations.
Remove all rock one inch or larger within 6 inches of finish grades in all non-hydro mulch planted areas.
C. Rip and cross rip to a depth of 6 inches all turf areas prior to the placement of import topsoil.
3.03 TOP SOIL PLACEMENT
A. Place topsoil to contours indicated on plans to create landscape berming.
B. Place topsoil in any way as indicated on plans
C. If insufficient on site soil is available, then contractor shall supply import topsoil.
3.04 FINISH LANDSCAPE GRADING
A. Finish grade shall conform, after settling, to shapes, spot elevations and contours as indicated on Landscape Architect’s Drawings, with uniform levels or slopes between finish elevations or between finish elevations and existing elevations.
B. Fine grade all planting areas to a smooth, loose and uniform surface. Remove all extraneous matter 1” or larger in size and dispose of off site to create a smooth surface.
Finish grades shall slope to drain, without water pockets or irregularities (humps or hollows). Grades shall be or uniform slope between points of fixed elevation establishing vertical curves or roundings at abrupt changes in slope.
C. Shrub/ground cover planting areas shall be graded two and one-half (4-1/2) inches below adjacent paved areas, sidewalks, valve boxes, headers, drains, etc. in order to receive two (4) inch depth of mulch, establishing final grade one-half (1/2) inches below these surfaces.
D. Turf areas shall be graded one and one half (1-1/2) inches below adjacent paved areas, sidewalks, valve boxes, headers, drains, etc. in order to receive sod.
3.05 FINISH LANDSCAPE GRADING OBSERVATION
A. Soil preparation: comply with SECTION 02905 - LANDSCAPE INSTALLATION prior to finish grading operations
179
Westacre Park Expansion and Renovation Project Section 02260 September 2024 Landscape Grading
02260-5
B. Finish grade shall conform, after compaction, to shapes, spot elevations and contours as indicated on Drawings, with uniform levels or slopes between finish elevations or between finish elevations and existing elevations.
C. The Contractor is responsible to spread excess excavated soil material from plant pits in surrounding planting beds.
D. Fine grade topsoil in all planting areas eliminating rough and low areas to insure positive drainage, to a smooth, loose and uniform surface. Maintain levels, profiles and contours of sub-grades.
E. Remove stones, roots, grass, weeds, debris and other foreign material while spreading, in excess of one inch in diameter.
F. Shrub/ground cover planting areas shall be graded two and one-half (4-1/2) inches below adjacent paved areas, sidewalks, valve boxes, headers, drains, etc. in order to receive two (4) inch depth of mulch, establishing final grade one-half (1/2) inches below these surfaces
END OF SECTION
.
180
Westacre Park Expansion and Renovation Project Section 02300 September 2024 Earthwork
02300-1
SECTION 02300
EARTHWORK
PART 1 GENERAL
1.01 SCOPE OF WORK
A. Furnish all labor, material, equipment, and services necessary to provide all work, complete in place, as indicated on Drawings and specified herein.
Work specified in this Section includes, but is not limited to the following:
1. Rough Grading of site, Excavating, backfilling and grading, as required to obtain contours and elevations indicated on the Drawings.
2. Subgrade preparation.
3. Compaction and Testing.
4. Protection.
5. Disposal.
B. Related Work Specified in Other Sections
1. SECTION 02230 – SITE CLEARING
2. SECTION 02324 – TRENCHING
3. SECTION 02741 – ASPHALTIC CONCRETE PAVEMENT
4. SECTION 02770 – CURBS AND GUTTERS
C. Related Documents
1. AASHTO T 180 - Standard Specification for Moisture-DensityRelations of Soils Using a 4.54 kg (10-lb) Rammer and a 457 mm (18 in.) Drop; American Association of State Highway and Transportation Officials; 1997.
2. ASTM D 698 - Standard Test Methods for Laboratory Compaction Characteristics of Soil Using Standard Effort (12,400 ft-lbf/ft3 (600 kN-m/m3)); 2000a.
3. ASTM D 1556 - Standard Test Method for Density and Unit Weight of Soil in Place by the Sand-Cone Method; 2000.
181
Westacre Park Expansion and Renovation Project Section 02300 September 2024 Earthwork
02300-2
4. ASTM D 1557 - Standard Test Methods for Laboratory Compaction Characteristics of Soil Using Modified Effort (56,000 ft-lbf/ft3 (2,700 kN m/m3)); 2000.
5. ASTM D 2167 - Standard Test Method for Density and Unit Weight of Soil in Place by the Rubber Balloon Method; 1994.
6. ASTM D 2419 - Standard Test Method for Sand Equivalent Value of Soils and Fine Aggregates; 1995.
7. ASTM D 2922 - Standard Test Methods for Density of Soil and Soil-Aggregate in Place by Nuclear Methods (Shallow Depth); 1996.
8. ASTM D 3017 - Standard Test Method for Water Content of Soil and Rock in Place by Nuclear Methods (Shallow Depth); 1996.
9. Geotechnical Investigation for site is available in accordance with Information Available to Bidders.
D. Definitions
1. Borrow: Approved soil material imported from off-site for use as Structural Fill or Backfill.
2. Excavation: Removal of material encountered above subgrade elevations. a. Authorized Over-Excavation: Excavation below subgrade elevations or beyond indicated horizontal dimensions as shown on plans or authorized by the Owner’s Representative.
b. Unauthorized Over-Excavation: Excavation below subgrade elevations or beyond indicated horizontal dimensions without authorization by the Owner’s Representative. Unauthorized excavation shall be without additional compensation.
4. Structural Backfill: Soil materials approved by the Owner’s Representative and used to fill excavations resulting from removal of existing below grade facilities, including trees. See Section 02324 – Trenching for trench backfill.
5. Structural Fill: Soil materials approved by the Owner’s Representative and used to raise existing grades.
6. Rock: Rock material in beds, ledges, unstratified masses, and conglomerate deposits and boulders of rock material ¾-cubic yards or more in volume that when 182
Westacre Park Expansion and Renovation Project Section 02300 September 2024 Earthwork
02300-3
tested by an independent geotechnical testing agency, according to ASTM D 1586, exceeds a standard penetration resistance of 100 blows/2-inches.
7. Structures: Buildings, footings, foundations, retaining walls, slabs, tanks, curbs, mechanical and electrical appurtenances, or other man made stationary features constructed above or below grade.
8. Subgrade: Surface or elevation remaining after completing excavation, or top surface of a fill or backfill immediately below subbase, base or topsoil materials.
9. Unsuitable Material: Any soil material that is not suitable for a specific use on the Project. The Owner’s Representative will determine if a soil material is unsuitable.
10. Utilities: underground pipes, conduits, ducts and cables.
1.02 SUBMITTALS
A. Follow submittal procedures outlined in Section 01330 – SUBMITTAL PROCEDURES.
B. Submit material certificates signed by the material producer and the Contractor, certifying that each material item complies with, or exceedsthe specified requirements.
C. Project Record Documents: Record actual locations of pipe mains, valves, connections, and invert elevations. Identify and describe unexpected variations to subsoil conditions or discovery of uncharted utilities.
1.03 QUALITY ASSURANCE
A. Testing and Inspection Service (Owner’s Representative) shall provide soil testing and inspection services for quality assurance testing during earthwork operations.
B. Percentage of compaction specified shall be the minimum acceptable. The percentage represents the ratio of the dry density of the compacted material to the maximum dry density of the material as determined by the procedure set forth in ASTM D 1557.
C. Perform excavation, filling, compaction and related earthwork under the observation of the Owner’s Representative. Materials placed without approval of the Owner’s Representative will be presumed to be defective and, at the discretion of the Owner’s Representative, shall be removed and replaced at no cost to the Owner. Notify the Owner’s Representative at least 24-hours prior to commencement of earthwork and at least 48 hours prior to testing.
D. The Owner’s Representative will perform observations and testsrequired to enable him 183
Westacre Park Expansion and Renovation Project Section 02300 September 2024 Earthwork
02300-4
to form an opinion of the acceptability of the Project earthwork. Correct earthwork that, in the opinion of the Owner’s Representative, does not meet the requirements of these Technical Specifications.
E. Upon completion of the construction work, certify that all compacted fills and foundations are in place at the correct locations, and have been constructed in accordance with sound construction practice. In addition, certify that the materials used are of the types, quality and quantity required by these Technical Specifications. The Contractor shall be responsible for the stability of all fills and backfills constructed by his forces and shall replace portions that in the opinion of the Owner’s Representative have been displaced or are otherwise unsatisfactory due to the Contractor’s operations.
F. Finish soil grade tolerance at completion of grading:
1. Top surface of finish grade (unpaved areas): ±0.05 feet
1.04 PROJECT CONDITIONS
A. The Contractor shall assess and evaluate all site conditions and layout the work before any earthwork shall begin.
B. Protect open excavations, trenches, and the like with fences, covers and railings to maintain safe pedestrian and vehicular traffic passage.
C. Protect wetland (including setback area) as shown on the plans and as directed by the Environmental Consultant.
D. Prevent erosion of freshly graded areas during construction and until such time as permanent drainage and erosion control measures have been installed.
E. Temporarily stockpile fill material in an orderly and safe manner and in a location approved by the Owner.
F. Provide dust and noise control in conformance with Division 1 General Requirements.
G. Environmental Requirements: When unfavorable weather conditions necessitate interrupting earthwork operation, areas shall be prepared by compaction of surface and grading to avoid collection of water. Provide adequate temporary drainage to prevent erosion. After interruption, compaction specified in last layer shall be re-established before resuming work.
PART 2 PRODUCTS
2.01 SOIL MATERIALS
A. General: Provide borrow soil materials when sufficientsatisfactory soil materials are not 184
Westacre Park Expansion and Renovation Project Section 02300 September 2024 Earthwork
02300-5
available from on-site excavations.
B. Obtain approval of on-site soil materials and borrow materials to be used for structural fill or structural backfill from the Owner’s Representative.
C. On-Site Structural Fill and Structural Backfill: per the County of Sacramento Construction Specifications and Geotechnical Investigation.
D. Imported Structural Fill and Structural Backfill: per the County of Sacramento Construction Specifications and Geotechnical Investigation.
PART 3 EXECUTION
3.01 GENERAL
A. Conform to Specifications as modified by the Contract Documents and the Geotechnical Investigation.
B. Surfaces to receive fill and soils to be compacted shall be free of standing water, and shall not be saturated with water.
C. Do not use explosives.
D. In asphalt concrete paved areas, neatly saw cut pavement a minimum of 24 inches beyond the limits of excavations. If edge of pavement is located within 30 inches of limit of excavation, remove pavement to existing edge.
E. Complete clearing and stripping as indicated on Drawings and in accordance with Section 02230 Site Clearing.
F. Remove existing utility lines that traverse the site as indicated on Drawings and in accordance with Section 02230 Site Clearing.
G. Scarify the upper 6 inches of the exposed subgrade-to-receive fill. The loosened soils should be uniformly moisture conditioned to one to three percent over optimum and compacted to 90 ± 2 percent relative compaction per ASTM D 1557. Compact to 95 percent in uppermost six inches of soil subgrade in pavement areas.
3.02 CONTROL OF WATER AND DEWATERING
A. Prevent surface water and ground water from entering excavations, from ponding on prepared subgrades, and from flooding the site and surrounding area. Provide dewatering equipment necessary to drain and keep excavations and site free from water.
B. Dewater during backfilling operation so that groundwater is maintained a least one foot below level of compaction effort.
C. Obtain the Owner’s Representative’s approval for proposed control of water and 185
Westacre Park Expansion and Renovation Project Section 02300 September 2024 Earthwork
02300-6
dewatering methods.
D. Protect subgrades from softening, undermining, washout and damage by rain or water accumulation.
E. Reroute surface water runoff away from excavated areas. Do not allow water to accumulate in excavations.
F. Maintain dewatering system in place until dewatering is no longer required.
3.03 WET WEATHER CONDITIONS
A. Do not prepare subgrade, place or compact soil materials if above moisture content indicated on the Geotechnical Investigation.
B. If the Owner’s Representative allows work to continue during wet weather conditions, conform to supplemental recommendations provided by the Owner’s Representative.
3.04 BRACING AND SHORING
A. Conform to California and Federal OSHA requirements.
B. Place and maintain such bracing and shoring as may be required to support the sides of the excavations for the proper protection of workmen; to facilitate the work; to prevent damage to the facility being constructed; and to prevent damage to adjacent structures or facilities. Remove all bracing and shoring upon completion of the work.
C. Be solely responsible for all bracing and shoring and, if requested by the Owner, submit details and calculations to the Owner. The Owner may forward the submittal to the Owner’s Representative, the Consulting Engineer and/or the California Division of Industrial Safety for their review. The Contractor's submittal shall include the basic design, assumed soils conditions and estimation of forces to be resisted, together with plans and specifications of the materials and methods to be used, and shall be prepared by a civil engineer or structural engineer registered in California. No excavations related to the proposed facility shall precede a response to the submittal by the Owner.
D. Be solely responsible for installing and extracting the sheathing in a manner which will not disturb the position or operation of the facility being constructed or adjacent utilities and facilities.
3.05 EXCAVATION
A. Excavate earth and rock to lines and grades shown on drawings and to the neat dimensions indicated on the Plans, required herein or as required to satisfactorily compact backfill.
B. Remove and dispose of large rocks, pieces of concrete and other obstructions encountered during excavation.
186
Westacre Park Expansion and Renovation Project Section 02300 September 2024 Earthwork
02300-7
C. Where forming is required, excavate only as much material as necessary to permit placing and removing forms.
D. Provide supports, shoring and sheet piles required to support the sides of excavations or for protection of adjacent existing improvements.
E. Excavate by hand or vacuum within drip-line of trees to remain. Do not damage trees or roots. Prevent dehydration of exposed roots. Refer to Section 02230 Site Clearing for additional tree protection requirements.
F. Replace the excavated material or any approved supplementary import material in lifts not to exceed 8 inchesin loose thickness and compact perthe Geotechnical Investigation.
3.06 REMOVAL OF EXISTING FILLS AND UNSUITABLE MATERIAL
A. Over-excavate areas of existing fills and other unsuitable material encountered during mass grading as directed by the Owner’s Representative.
B. Compensation for increased removal widths and depths that are not required by the Owner’s Representative will not be considered, except when such increase is necessary for protection of life and property as determined by and approved by the Owner.
C. The Owner’s Representative will provide written approval for each excavation prior to placement of fill. Allow adequate time after excavation and before filling for the Owner’s Representative’s review and written approval and, if necessary, time for the Owner to conduct as built survey prior to placing fill. Basis for calculating the quantity of material excavated or placed may be the difference between the grading shown on the Plan and an as built survey of the grading.
3.07 GRADING
A. Provide smooth finished surfaces within specified tolerances, compact with uniform levels or slopes between points where elevations are indicated on Drawings, or between such points and existing grades.
B. Finish ditches, gutters and swales to the sections, lines and grades indicated and to permit proper surface drainage.
C. Round tops and bottoms of slopes as indicated or to blend with existing contours.
3.08 SUBGRADE PREPARATION
A. Install underground utilities and service connections prior to final preparation of subgrade and placement of base materials for final surface facilities. Extend services so that final surface facilities are not disturbed when service connections are made. 187
Westacre Park Expansion and Renovation Project Section 02300 September 2024 Earthwork
02300-8
B. Prepare subgrades under paved areas, curbs, gutters, walks, structures, other surface facilities and areas to receive structural fill.
C. Prepare subgrades for paved areas, curbs and gutters by plowing or scarifying surface at least 6 inches below final subgrade elevations and 5-feet beyond edge of pavement unless specified otherwise by the Owner’s Representative. Uniformly moisture condition to one to three percent over optimum moisture contents. Break clods and condition surface by harrowing or dry rolling. Remove boulders, hard ribs and solid rock. Prepare earth uniform for full depth and width of subgrade.
D. Protect utilities from damage during compaction of subgrades and until placement of final pavements or other surface facilities.
E. Obtain the Owner’s Representative’s approval of subgrades prior to placing pavement.
3.09 PLACEMENT OF STRUCTURAL FILL
A. Obtain the Owner’s Representative’s approval of surface to receive structural fill prior to placement of structural fill material.
B. Place structural fill on prepared subgrade.
C. Spread structural fill material in uniform lifts not more than 8-inches in un-compacted thickness and compact.
D. Place structural fill material to suitable elevations above grade to provide for anticipated settlement and shrinkage.
E. Overbuild fill slopes, as required by the Owner’s Representative, to obtain required compaction. Remove excess material to lines and grades indicated.
F. Do not drop fill on structures. Do not backfill around, against or upon concrete or masonry structures until structure has attained sufficient strength to withstand loads imposed and the horizontal structural system had been installed.
3.10 COMPACTION AND TESTING
A. General: Control soil compaction during construction providing minimum percentage of density specified for each area classification as indicated below.
B. Percentage of Maximum Density Requirements: Compact soil to no less than the following percentages of maximum density in accordance with ASTM D 1557.
2. Lawn or Planter Areas: Compact top 6 inches of subgrade and each layer of backfill or fill material at 85 ± 2 percent relative compaction.
3. Vehicular pavements: Compact top 12 inches of subgrade and each layer of backfill or fill material at 90 ± 2 percent relative compaction. The upper 6 inches 188
Westacre Park Expansion and Renovation Project Section 02300 September 2024 Earthwork
02300-9
of pavement subgrade soils shall be compacted to at least 95 percent relative compaction.
C. Moisture Control: Where subgrade or layer of soil material must be moisture conditioned before compaction, uniformly apply water to surface of subgrade, or layer of soil material, to prevent free water appearing on surface during or subsequent to compaction operations.
1. Remove and replace or scarify and air dry soil material that is too wet to permit compaction to specified density.
2. Soil material that has been removed because it is too wet to permit compaction may be stockpiled or spread and allowed to dry. Assist drying by discing, harrowing or pulverizing until moisture content is reduced to a satisfactory value.
D. Compact soils at water content specified in the Geotechnical Investigation. Aerate material if it is too wet. Add water to material if it is too dry. Thoroughly mix lifts before compaction to ensure uniform moisture distribution.
E. Perform compaction using rollers, pneumatic or vibratory compactors or other equipment and mechanical methods approved by the Owner’s Representative.
3.11 PROTECTION
A. Protection of Graded Areas: Protect newly graded areas from traffic and erosion. Keep free of trash and debris.
B. Cold Weather Protection: Protect excavation bottoms against freezing when atmospheric temperature is less than 35 degrees F.
C. Repair and re-establish gradesin settled, eroded, and rutted areasto specified tolerances.
D. Where completed compacted areas are disturbed by subsequent construction operations or adverse weather, scarify surface, re-shape, and compact to required density prior to further construction.
3.12 DISPOSAL
A. Stockpile suitable excess soil material per the Drawings and as directed by the Owner.
B. Lawfully dispose of all unsuitable excess or surplus material off-site at no cost to the Owner.
END OF SECTION
189
Westacre Park Expansion and Renovation Project SECTION 02316 September 2024 Fill and Backfill
02316-1
SECTION 02316
FILL AND BACKFILL
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Filling and compacting for concrete paving and rigid concrete pavements subject to traffic loadings.
B. Backfilling and compacting for utilities to utility main connections.
1.02 RELATED SECTIONS
A. General Conditions and Special Provisions for Air and Water Pollution Control and Dust Control
B. Section 02260 – Landscape Grading
C. Section 02515 – Site Concrete
D. Section 02811 – Irrigation: Trenching and Backfill
1.03 REFERENCES
A. ASTM C 136 - Standard Test Method for Sieve Analysis of Fine and Coarse Aggregates; 1996a.
B. ASTM D 1557 - Test Method for Laboratory Compaction Characteristics of Soil Using Modified Effort (56,000 ft-lbf/ft3 (2,700 kN mlm3)); 1991 (Reapproved 1998).
C. ASTM D 2487 - Standard Classification of Soils for Engineering Purposes (Unified Soil Classification System); 1998.
D. ASTM D 2922 - Standard Test Methods for Density of Soil and Soil-Aggregate in Place by Nuclear Methods (Shallow Depth); 1996.
E. ASTM D 2974 - Standard Test Methods for Moisture, Ash, and Organic Matter of Peat and Other Organic Soils; 1996.
E. ASTM D 3017 - Standard Test Method for Water Content of Soil and Rock in Place by Nuclear Methods (Shallow Depth); 1996.
F. ASTM D 4318 - Standard Test Method for Liquid Limit, Plastic Limit, and Plasticity Index of Soils; 1998.
1.04 PROJECT CONDITIONS
A. Provide sufficient quantities of fill to meet project schedule and requirements. When necessary, store materials on site in advance of need.
B. Verify that survey benchmarks and intended elevations for the Work are as indicated.
PART 2 PRODUCTS
190
Westacre Park Expansion and Renovation Project SECTION 02316 September 2024 Fill and Backfill
02316-2
2.01 FILL MATERIALS
A. Engineered Fill: Subsoil excavated on-site.
1. Free of lumps larger than 3 inches, rocks larger than 2 inches, and debris.
2. Conforming to ASTM D 2487 Group Symbol CL, ML, SM, SP.
B. Engineered Fill: Imported borrow.
1. Graded in accordance with ASTM C 136, within the following limits:
a. 3 inch sieve: 100 percent passing.
b. 3/4 inch sieve: 70 to 100 percent passing.
c. No. 4 sieve: 50 to 100 percent passing.
d. 40 sieve: 30 to 100 percent passing.
e. 50: 30 to 100 percent passing.
f. No. 200: 30 to 70 percent passing.
2. Free of lumps larger than 3 inches, rocks larger than 2 inches, and debris.
3. Conforming to ASTM D 2487 Group Symbol CL, ML, SM, SP.
4. Liquid limit < 30. Plasticity Index < 12.
5. Organic content less than 3%.
6. Expansion potential (UBC 18-2) less than 20.
7. Maximum Dry Density more than 105 pcf.
C. Topsoil: See Section 02260.
D. Class 2 Aggregate Base: See Section 02721Aggregate Base Course.
2.02 SOURCE QUALITY CONTROL
A. Where import fill materials are specified by reference to a specific standard, test and analyze samples for compliance before delivery to site.
B. If tests indicate materials do not meet specified requirements, change material and retest.
PART 3 EXECUTION
3.01 EXAMINATION
A. Identify required lines, levels, contours, and datum locations.
B. See Section 02260 for additional requirements.
3.02 PREPARATION
A. Scarify all areas to receive engineered fill and subgrade surfaces to a depth of 12 inches.
B. During wet weather or unstable soil conditions, the Contractor shall have the Landscape Architect observe all areas to receive engineered fill and subgrade surfaces prior to implementation of remedial measures.
191
Westacre Park Expansion and Renovation Project SECTION 02316 September 2024 Fill and Backfill
02316-3
1. Upon approval of the Landscape Architect, all unstable areas to receive engineered fill and subgrade surfaces shall be disked or ripped to a minimum depth of 24 inches to allow exposed soil to dry. Depth and frequency of disking and ripping shall be determined by the Landscape Architect upon observation of the unstable soil conditions.
2. Upon approval of the Landscape Architect, all unstable areas to receive engineered fill and subgrade surfaces shall be over excavated 12 to 24 inches below existing grade and be replaced with aggregate base or coarse gravel underlain by geotextile fabric. Final depth of removal shall be determined by the Landscape Architect upon observation of the unstable soil conditions. The geotextile fabric shall be Amoco 2016 (woven) or approved equivalent, placed in accordance with manufacturer's recommendations.
C. The Contractor shall have the Landscape Architect observe and probe bottom of finish subgrade for its stability within existing trench fill extending to a width of 15 feet on each side of existing sanitary sewer pipelines beneath new pavement improvements.
1. If loose or soft material is encountered, the existing trench fill shall be removed to a depth of two feet below finished subgrade elevation. The Contractor shall have the Landscape Architect observe and probe the bottom of the excavation for its stability prior to placing compacted engineered fill. If loose or soft material is encountered, geotextile/stabilizing fabric, Amoco 2016 (woven) or approved equivalent, shall be placed at the bottom of the excavation.
D. Recompact between 88 and 92 percent of maximum dry density at a uniform moisture content between 2 and 5 percent above optimum moisture content at the time of compaction.
E. Recompact to 95 percent of maximum dry density at a uniform moisture content between 2 and 5 percent above optimum moisture content at the time of compaction in the upper 6 inches of subgrade in all areas to support asphalt or rigid concrete pavements.
F. Until ready to fill, maintain excavations and prevent loose soil from falling into excavation.
3.03 FILLING
A. Fill to contours and elevations indicated using unfrozen materials.
B. Fill up to subgrade elevations unless otherwise indicated.
C. Employ a placement method that does not disturb or damage other work.
D. Do not fill over porous, wet, frozen or spongy subgrade surfaces.
E. Uniformly moisture-conditioned to between 2 and 5 percent above optimum moisture content of fill materials to attain required compaction density.
F. Soil Fill: Place and compact material in equal continuous layers not exceeding 8 inches loose thickness.
G. Correct areas that are over-excavated.
H. Compaction Density Unless Otherwise Specified or Indicated:
1. Between 88 and 92 percent of maximum dry density at a uniform moisture content between 2 and 5 percent above optimum moisture content at the time of 192
Westacre Park Expansion and Renovation Project SECTION 02316 September 2024 Fill and Backfill
02316-4
compaction.
2. At 95 percent of maximum dry density in the upper 6 inches of subgrade in all areas to support asphalt or rigid concrete pavements.
I. Reshape and re-compact fills subjected to construction vehicular traffic.
3.04 FILL AT SPECIFIC LOCATIONS
A. Use engineered fill unless otherwise specified or indicated.
B. Engineered fill at areas to receive rigid concrete pavements:
1. Fill up to subgrade elevations.
2. Maximum depth per lift: 8 inches, loose thickness.
3. Between 88 and 92 percent of maximum dry density at a uniform moisture content at between 2 and 5 percent above optimum moisture content at the time of compaction.
4. Compact upper 6 inches of subgrade to minimum 95 percent of maximum dry density at between 2 and 5 percent above optimum moisture content at the time of compaction.
C. At Lawn Areas: See Section 02260 Landscape Grading
D. At Planting Areas Other Than Lawns: See Section 02260 Landscape Grading E. Trench Backfilling:
1. See Storm Drain Pipe, Potable Water Supply Specifications
2. See Section 02811 Irrigation
3.05 TOLERANCES
A. Top Surface of General Filling: See Section 02260 Landscape Grading B. Top Surface of Filling Under Paved Areas: Plus or minus 0.05 foot from required elevations.
3.06 FIELD QUALITY CONTROL
A. Compaction density testing will be performed on compacted fill in accordance with ASTM D2922.
B. Results will be evaluated in relation to compaction curve determined by testing uncompacted material in accordance with ASTM D 1557 ("modified Proctor" ).
END OF SECTION
193
Westacre Park Expansion and Renovation Project Section 02324 Semptember 2024 Trenching
02324-1
SECTION 02324
TRENCHING
PART 1 GENERAL
1.01 SCOPE OF WORK
A. Furnish all labor, material, equipment and services necessary to provide all work, complete in place, as indicated on Drawings and specified herein.
Work specified in this Section includes, but is not limited to the following:
1. Section includes trenching, backfilling and compacting for water and storm drain utilities.
B. Related Work Specified in Other Sections
1. SECTION 02300 – EARTHWORK
2. SECTION 02510 – WATER DISTRIBUTION
3. SECTION 02630 – STORM DRAINAGE
C. Related Documents
1. ASTM D 1557 - Standard Test Methods for Laboratory Compaction Characteristics of Soil Using Modified Effort (56,000 ft-lbf/ft3); 2000.
2. County of Sacramento Standard Construction Specifications.
3. Geotechnical Investigation for site is available in accordance with Information Available to Bidders.
4. Office of Safety and Health Act (OSHA) Construction Safety Orders.
5. California Code of Regulations Title 8: Construction Safety Orders.
D. Definitions
1. Bedding: Material from bottom of trench to bottom of pipe.
2. Initial Backfill: Material from bottom of pipe to 12-inches above top of pipe.
3. Relative Compaction: Ratio, expressed as a percentage of field dry density as compacted to a maximum dry density of representative sample of the same material determined by American Society for Testing and Materials (ASTM) Test Method D1557 (c).
194
Westacre Park Expansion and Renovation Project Section 02324 Semptember 2024 Trenching
02324-2
4. Springline of Pipe: Imaginary line on surface of pipe at a vertical distance of ½ the outside diameter measured from the top or bottom of the pipe.
5. Subsequent Backfill: Material from 12-inches above top of pipe to subgrade of surface material or subgrade of surface facility or to finish grade.
6. Trench Excavation: Removal of material encountered above subgrade elevations and within horizontal trench dimensions.
a. Authorized Trench Over-Excavation: Excavation below trench subgrade elevations or beyond indicated horizontal trench dimensions as shown on plans or authorized by the Owner’s Representative.
b. Unauthorized Trench Over-Excavation: Excavation below trench subgrade elevations or beyond indicated horizontal trench dimensions without authorization by the Owner’s Representative. Unauthorized excavation shall be without additional compensation.
1.02 SUBMITTALS
A. Follow submittal procedures outlined in Section 01330 – SUBMITTAL PROCEDURES.
B. Product Data: Provide data for Products specified.
C. Manufacturer's Installation Instructions: Indicate special procedures required to install Products specified.
D. Manufacturer's Certificate: Certify that products meet or exceed specified requirements.
E. Project Record Documents: Record actual locations of pipe mains, valves, connections, and invert elevations. Identify and describe unexpected variations to subsoil conditions or discovery of uncharted utilities.
F. Submit name of imported materials source.
G. Deliver samples of backfill and fill materials to Owner’s Representative in quantities sufficient for testing. Deliver at least 15 days prior to use.
1.03 QUALITY ASSURANCE
A. Conform all work and materials to the recommendations or requirements of these Technical Specifications and plans and meet the approval of the Owner’s Representative.
B. Conform all work to the appropriate portion(s) of County of Sacramento Standard Construction Specifications.
195
Westacre Park Expansion and Renovation Project Section 02324 Semptember 2024 Trenching
02324-3
C. Percentage of compaction specified shall be the minimum acceptable. The percentage represents the ratio of the dry density of the compacted material to the maximum dry density of the material as determined by the procedure set forth in ASTM D 1557.
D. The Owner’s Representative will perform observations and tests required to enable him to form an opinion of the acceptability of the trench backfill. Correct the trench backfill that, in the opinion of the Owner’s Representative, does not meet the requirements of these Technical Specifications.
E. Provide materials of each type from same source throughout the Work.
1.04 PROJECT CONDITIONS
A. The Contractor shall assess and evaluate all site conditions and layout the work before any earthwork shall begin.
B. Protect open, trenches, and utility structure excavations with fences, covers and railings to maintain safe pedestrian and vehicular traffic passage.
C. Stockpile on-site and imported backfill material temporarily in an orderly and safe manner.
D. Provide dust and noise control in conformance with Division 1 General Requirements.
1.05 WARRANTY
A. The Contractor shall warrant against settlement for a period of one year after the date of final acceptance, and shall repair damage caused by settlement within that time. For the purpose of this Specification, settlement will be deemed to have occurred if on paved surfaces, the depression falls 3/8-inches below the average of the sides of the uncut portion.
PART 2 PRODUCTS
2.01 PIPE BEDDING AND INITIAL BACKFILL
A. Conform to Sacramento County Standards
.
2.02 WARNING TAPE
A. See Section 33 1300 – Water Distribution.
2.03 SUBSEQUENT BACKFILL
A. Conform to on-site or imported structural backfill in Section 02300 – Earthwork. 196
Westacre Park Expansion and Renovation Project Section 02324 Semptember 2024 Trenching
02324-4
2.04 CONTROLLED DENSITY FILL (CDF) (in trenches)
A. Provide non-structural CDF, from bottom of trench to finish subgrade of subbase or base material, that can be excavated by hand and produce unconfined compressive 28- day strengths from 50-psi to a maximum of 150-psi. Provide aggregate no larger than 3/8-inch top size. The 3/8-inch aggregate shall not comprise more than 30% of the total aggregate content.
B. Cement: Conform to the standards as set forth in ASTM C-150, Type II Cement.
C. Fly Ash: Conform to the standards as set forth in ASTM C-618, for Class F pozzolan.
Do not inhibit the entrainment of air with the fly ash.
D. Air Entraining Agent: Conform to the standards as set forth in ASTM C-260.
E. Aggregates need not meet the standards as set forth in ASTM C-33. Any aggregate, producing performances characteristics described herein will be accepted for consideration. The amount of material passing a #200 sieve shall not exceed 12% and no plastic fines shall be present.
F. Provide CDF that is a mixture of cement, Class F pozzolan, aggregate, air entraining agent and water. CDF shall be batched by a ready mixed concrete plant and delivered to the job site by means of transit mixing trucks.
G. The Contractor shall determine the actual mix proportions of the controlled density fill to meet job site conditions, minimum and maximum strengths, and unit weight.
Entrained air content shall be a minimum of 4.0%. The actual entrained air content shall be established for each job with the materials and aggregates to be used to meet the placing and unit weight requirements. Entrained air content may be as high as 20% for fluidity requirements.
H. Mix design shall meet the Owner’s Representative’s approval.
2.05 CONCRETE STRUCTURE BEDDING AND BACKFILL
A. Precast Structures: Same materials to the same heights as specified for pipe bedding and backfill, or other material approved by the Owner’s Representative.
B. Poured-in-Place Structures:
1. Bedding: Bedding shall meet the approval of the Owner’s Representative. In general, bedding is not required, pour bases against undisturbed native earth in cut areas and against engineered fill compacted to 90% relative compaction in embankment areas.
2. Side Backfill: On-site or imported structural fill meeting the requirements given in Section 02300.
197
Westacre Park Expansion and Renovation Project Section 02324 Semptember 2024 Trenching
02324-5
2.06 FILTER FABRIC
A. Filter Fabric:
1. Mirafi 140N (Mirafi Inc., Charlotte, NC) (Tel. 800-438-1855) or equal.
PART 3 EXECUTION
3.01 PREPARATION AND EXAMINATION
A. Underpin adjacent structures, which may be damaged by excavation Work, including utilities.
B. Maintain trench crossings for vehicular and pedestrian traffic at street crossing, driveways and fire hydrants.
C. Identify required lines, levels, contours, and datum locations.
D. Locate, identify, and protect utilities that remain and protect from damage.
E. See Section 02300 Earthwork for additional requirements.
3.02 TRENCHING AND EXCAVATION
A. Existing PCC or AC Areas: Cut PCC or AC to full depth at a minimum distance of 12-inches beyond the edge of the trench.
B. Excavate by hand or machine. For gravity systems begin excavation at the outlet end and proceed upstream. Excavate sides of the trench parallel and equal distant from the centerline of the pipe. Hand trim excavation. Remove loose matter.
C. Excavation Depth for Bedding: Minimum of 4-inches below bottom of pipe or as otherwise allowed or required by the Owner’s Representative, except that bedding is not required for nominal pipe diameters of 2-inches or less.
D. Excavation Width at Springline of Pipe:
1. Up to a nominal pipe diameter of 24-inches: Minimum of twice the outside pipe diameter, or as otherwise allowed or required by the Owner’s Representative.
2. Nominal pipe diameter of 30-inches through 36-inches: Minimum of the outside pipe diameter plus 2-feet, or as otherwise allowed or required by the Owner’s Representative.
3. Nominal pipe diameter of 42-inches through 60-inches: Minimum of the outside pipe diameter plus 3-feet, or as otherwise allowed or required by the Owner’s Representative.
198
Westacre Park Expansion and Renovation Project Section 02324 Semptember 2024 Trenching
02324-6
E. Over-Excavations: Backfill trenches that have been excavated below bedding design subgrade, with approved bedding material.
F. Comply with the Owner’s limitations on the amount of trench that is opened or partially opened at any one time. Do not leave trenches open overnight without the approval of the Owner.
G. Where forming is required, excavate only as much material as necessary to permit placing and removal of forms.
H. Bottoms of trenches will be subject to testing by Owner’s Representative. Correct deficiencies as directed by the Owner’s Representative.
I. Grade bottom of trench to provide uniform thickness of bedding material and to provide uniform bearing and support for pipe along entire length. Remove stones to avoid point bearing.
3.03 CONTROL OF WATER AND DEWATERING
A. Be solely responsible for dewatering trenches and excavations and subsequent control of ground and surface water. Provide and maintain such pumps or other equipment as may be necessary to control ground water and seepage to the satisfaction of the Owner’s Representative and the Owner until backfilling is completed.
B. Dewater during backfilling operation so that groundwater is maintained a least one foot below level of compaction effort.
C. Obtain the Owner’s Representative’s approval for proposed control of water and dewatering methods.
D. Reroute surface water runoff away from open trenches and excavations. Do not allow water to accumulate in trenches and excavations.
E. Maintain dewatering system in place until dewatering is no longer required.
3.04 BRACING AND SHORING
A. Conform to California and Federal OSHA requirements.
B. Place and maintain such bracing and shoring as may be required to support the sides of the excavations for the proper protection of workmen; to facilitate the work; to prevent damage to the pipes and appurtenances being constructed; and to prevent damage to adjacent structures or facilities. Remove all bracing and shoring upon completion of the work.
C. Be solely responsible for all bracing and shoring and, if requested by the Owner, submit details and calculations to the Owner. The Owner may forward the submittal to the Owner’s Representative, the Consulting Engineer and/or the California 199
Westacre Park Expansion and Renovation Project Section 02324 Semptember 2024 Trenching
02324-7
Division of Industrial Safety for their review. The Contractor's submittal shall include the basic design, assumed soils conditions and estimation of forces to be resisted, together with plans and specifications of the materials and methods to be used, and shall be prepared by a civil engineer or structural engineer registered in California. No excavations in trench section or around structures shall precede a response to the submittal by the Owner.
D. Be solely responsible for installing and extracting the sheathing in a manner which will not disturb the line, grade, or backfill compaction or operation of the utility being installed or adjacent utilities and facilities.
3.05 PIPE BEDDING
A. Obtain approval of bedding material from the Owner’s Representative.
B. Pipe Bedding shall be per the City of Sacramento Standards and per the Geotechnical Investigation report.
C. Upon completion of bedding operations, and prior to the installation of pipe, notify the Owner’s Representative, who will inspect the bedding layer. Do not commence pipe laying until the Owner’s Representative has approved the bedding.
3.06 WARNING TAPE
A. Install in accordance with Section 033 1100 – Water Distribution.
3.07 BACKFILLING
A. Obtain approval of backfill material from Owner’s Representative.
B. Bring initial backfill up simultaneously on both sides of the pipe, so as to prevent any displacement of the pipe from its true alignment. Initial Backfill shall be per the City of Sacramento Standards and per the Geotechnical Investigation report. Jetting or ponding of initial backfill material will not be permitted.
C. Bring subsequent backfill to subgrade or finish grade as indicated. Subsequent Backfill shall be per the City of Sacramento Standards and per the Geotechnical Investigation report. Jetting or ponding of subsequent backfill material will not be permitted.
D. Do not use compaction equipment or methods that produce horizontal or vertical earth pressures that may cause excessive pipe displacement or damage the pipe.
E. Utility backfill shall be inspected and tested by the Owner’s Representative during placement. Cooperate with the Owner’s Representative and provide working space for such tests in operations. Backfill not compacted in accordance with these specifications shall be re-compacted or removed as necessary and replaced to meet the specified requirements, to the satisfaction of the Owner’s Representative and the 200
Westacre Park Expansion and Renovation Project Section 02324 Semptember 2024 Trenching
02324-8
Owner prior to proceeding with the Project.
3.08 CLEANUP
A. Leave unused materials in a neat, compact stockpile during progress of work.
B. Remove unused stockpiled materials. Leave area in a clean and neat condition.
Grade stockpile area to prevent standing surface water.
C. Upon completion of utility earthwork all lines, manholes catch basins, inlets, water meter boxes and other structures shall be thoroughly cleaned of dirt, rubbish, debris and obstructions of any kind to the satisfaction of the Owner.
D. Leave borrow areas in a clean and neat condition. Grade to prevent standing surface water.
E. The Contractor shall remove and dispose of all excess excavated material to a suitable site. The proper and legal disposal shall be the responsibility of the Contractor.
END OF SECTION
201
Westacre Park Expansion and Renovation Project Section 02470 September 2024 Site Furnishings
02470-1
SECTION 02470
SITE FURNISHINGS
PART 1 - GENERAL
1.01 SCOPE OF WORK
The work included in this section generally consists of providing all labor, equipment and materials necessary to install all site furnishings complete as shown on the plans and as described herein.
1.02 RELATED SECTIONS
A. Section 02515 - Concrete Paving
1.03 SUBMITTALS
Submit 6 copies of manufacturer's cut sheet and specification for approval within two weeks of notice to proceed.
1.04 DELIVERY, STORAGE AND HANDLING
Contractor assumes all responsibility for storage of all materials relative to this project.
Owner assumes no liability for losses or damages from any cause as a result of such storage.
1.05 PROJECT CONDITIONS – PROTECTION
A. After site furnishings are installed, all damage to surrounding paving, turf, and irrigation system shall be repaired by the contractor at the contractor's expense.
B. All trees and shrubs in and around the project site shall be protected by the contractor and, if damaged, replaced at the contractor’s expense. This provision is in effect until acceptance by owner of the complete project
1.06 LOCATION INSPECTION
No equipment, apparatus or foundations for same shall be placed until location stakes have been inspected and accepted by the Owner.
1.07 GUARANTEE & LIABILITY INSURANCES
A. Manufacturer shall guarantee all materials and workmanship for a period of one (1) year exclusive of vandalism.
B. The manufacturer will be required to provide complete installation drawings including specifications and a replacement parts list for all products. 202
Westacre Park Expansion and Renovation Project Section 02470 September 2024 Site Furnishings
02470-2
C. Contractor shall provide a written guarantee on his firm's letterhead for all materials and workmanship for a period of one (1) year, exclusive of vandalism.
Written guarantee shall be submitted to the Owner at the final inspection prior to final acceptance of the work.
PART 2 – PRODUCTS
2.01 MATERIALS
A. Aluminum: Alloy and temper recommended by aluminum producer and finisher for type of use and finish indicated; free of surface blemishes and complying with the following:
1. Rolled or Cold-Finished Bars, Rods, and Wire: ASTM B 211 (ASTM B 211M).
2. Extruded Bars, Rods, Wire, Profiles, and Tubes: ASTM B 221 (ASTM B 221M).
3. Structural Pipe and Tube: ASTM B 429.
4. Sheet and Plate: ASTM B 209 (ASTM B 209M).
5. Castings: ASTM B 26/B 26M.
B. Steel and Iron: Free of surface blemishes and complying with the following:
1. Plates, Shapes, and Bars: ASTM A 36/A 36M.
2. Steel Pipe: Standard-weight steel pipe complying with ASTM A 53, or electric-resistance-welded pipe complying with ASTM A 135.
3. Tubing: Cold-formed steel tubing complying with ASTM A 500.
4. Mechanical Tubing: Cold-rolled, electric-resistance-welded carbon or alloy steel tubing complying with ASTM A 513, or steel tubing fabricated from steel complying with ASTM A 1011/A 1011M and complying with dimensional tolerances in ASTM A 500; zinc coated internally and externally.
5. Sheet: Commercial steel sheet complying with ASTM A 1011/A 1011M.
6. Expanded Metal: Carbon-steel sheets, deburred after expansion, and complying with ASTM F 1267.
7. Malleable-Iron Castings: ASTM A 47/A 47M, grade as recommended by fabricator for type of use intended.
8. Gray-Iron Castings: ASTM A 48/A 48M, Class 200.
C. Stainless Steel: Free of surface blemishes and complying with the following:
1. Sheet, Strip, Plate, and Flat Bars: ASTM A 666.
2. Pipe: Schedule 40 steel pipe complying with ASTM A 312/A 312M.
3. Tubing: ASTM A 554.
D. Fiberglass: Multiple laminations of glass-fiber-reinforced polyester resin with UVlight stable, colorfast, nonfading, weather- and stain-resistant, colored polyester gel coat, and manufacturer's standard finish.
203
Westacre Park Expansion and Renovation Project Section 02470 September 2024 Site Furnishings
02470-3
E. Plastic: Color impregnated, color and UV-light stabilized, and mold resistant.
1. Polyethylene: Fabricated from virgin plastic HDPE resin.
F. Anchors, Fasteners, Fittings, and Hardware: Manufacturer's standard, corrosionresistant-coated or noncorrodible materials; commercial quality, tamperproof, vandal and theft resistant, concealed, recessed, and capped or plugged.
G. Nonshrink, Nonmetallic Grout: Premixed, factory-packaged, nonstaining, noncorrosive, nongaseous grout complying with ASTM C 1107; recommended in writing by manufacturer, for exterior applications.
H. Erosion-Resistant Anchoring Cement: Factory-packaged, nonshrink, nonstaining, hydraulic-controlled expansion cement formulation for mixing with potable water at Project site to create pourable anchoring, patching, and grouting compound; resistant to erosion from water exposure without needing protection by a sealer or waterproof coating; recommended in writing by manufacturer, for exterior applications.
I. Galvanizing: Where indicated for steel and iron components, provide the following protective zinc coating applied to components after fabrication:
1. Zinc-Coated Tubing: External, zinc with organic overcoat, consisting of a minimum of 0.9 oz./sq. ft. (0.27 kg/sq. m) of zinc after welding, a chromate conversion coating, and a clear, polymer film. Internal, same as external or consisting of 81 percent zinc pigmented coating, not less than 0.3 mil (0.0076 mm) thick.
2. Hot-Dip Galvanizing: According to ASTM A 123/A 123M, ASTM A 153/A 153M, or ASTM A 924/A 924M.
2.02 FABRICATION
A. Metal Components: Form to required shapes and sizes with true, consistent curves, lines, and angles. Separate metals from dissimilar materials to prevent electrolytic action.
B. Welded Connections: Weld connections continuously. Weld solid members with full-length, full-penetration welds and hollow members with full-circumference welds. At exposed connections, finish surfaces smooth and blended so no roughness or unevenness shows after finishing and welded surface matches contours of adjoining surfaces.
C. Pipes and Tubes: Form simple and compound curves by bending members in jigs to produce uniform curvature for each repetitive configuration required; maintain cylindrical cross section of member throughout entire bend without buckling, twisting, cracking, or otherwise deforming exposed surfaces of handrail and railing components.
204
Westacre Park Expansion and Renovation Project Section 02470 September 2024 Site Furnishings
02470-4
D. Preservative-Treated Wood Components: Complete fabrication of treated items before treatment if possible. If cut after treatment, apply field treatment complying with AWPA M4 to cut surfaces.
E. Exposed Surfaces: Polished, sanded, or otherwise finished; all surfaces smooth, free of burrs, barbs, splinters, and sharpness; all edges and ends rolled, rounded, or capped.
F. Factory Assembly: Assemble components in the factory to greatest extent possible to minimize field assembly. Clearly mark units for assembly in the field.
2.03 FINISHES, GENERAL
A. Comply with NAAMM's "Metal Finishes Manual for Architectural and Metal Products" for recommendations for applying and designating finishes.
B. Appearance of Finished Work: Variations in appearance of abutting or adjacent pieces are acceptable if they are within one-half of the range of approved Samples.
Noticeable variations in the same piece are not acceptable. Variations in appearance of other components are acceptable if they are within the range of approved Samples and are assembled or installed to minimize contrast.
2.04 ALUMINUM FINISHES
Baked-Enamel, Powder-Coat Finish: Manufacturer's standard, baked, polyester, powder-coat finish complying with finish manufacturer's written instructions for surface preparation, including pretreatment, application, baking, and minimum dry film thickness.
2.05 STEEL AND GALVANIZED STEEL FINISHES
A. Baked-Enamel, Powder-Coat Finish: Manufacturer's standard, baked, polyester, powder-coat finish complying with finish manufacturer's written instructions for surface preparation, including pretreatment, application, baking, and minimum dry film thickness.
B. PVC Finish: Manufacturer's standard, UV-light stabilized, mold-resistant, slipresistant, matte-textured, dipped or sprayed-on, PVC-plastisol finish, with flame retardant added; complying with coating manufacturer's written instructions for pretreatment, application, and minimum dry film thickness.
2.06 IRON FINISHES
Baked-Enamel, Powder-Coat Finish: Manufacturer's standard, baked, polyester, powder-coat finish complying with finish manufacturer's written instructions for surface preparation, including pretreatment, application, baking, and minimum dry film thickness.
2.07 STAINLESS-STEEL FINISHES
205
Westacre Park Expansion and Renovation Project Section 02470 September 2024 Site Furnishings
02470-5
A. Remove tool and die marks and stretch lines or blend into finish.
B. Grind and polish surfaces to produce uniform, directionally textured, polished finish indicated, free of cross scratches. Run grain with long dimension of each piece.
PART 3 – EXECUTION
3.01 LAYOUT
Contractor shall stake/mark locations for all slabs and foundations and shall obtain the approval of their location from Landscape Architect prior to commencing any digging.
Locations shall be adjusted to provide minimum clear distances required from all edges of slabs, trees, irrigation heads, or other obstructions.
3.02 CONCRETE WORK
All concrete work shall conform to the Standard Plans, and those of Section 02515.
Contractor shall obtain the approval of all forming from the Landscape Architect prior to pouring any concrete slabs. Foundations holes shall be inspected and approved by the Public Works Inspector prior to pouring concrete.
3.03 INSTALLATION
A. Unless otherwise indicated, install site furnishings after landscaping and paving have been completed.
B. Install site furnishings level, plumb, true, and securely anchored and positioned at locations indicated on Drawings.
C. .Posts Set into Voids in Concrete: Form or core-drill holes for installing posts in concrete to depth recommended in writing by manufacturer of site furnishings and 3/4 inch (19 mm) larger than OD of post. Clean holes of loose material, insert posts, and fill annular space between post and concrete with nonshrink, nonmetallic grout or anchoring cement, mixed and placed to comply with anchoring material manufacturer's written instructions, with top smoothed and shaped to shed water.
D. All site furnishings shall be installed with vandal-proof hardware or made vandal-proof (deforming or peening).
E. Maintain specific required distance between top of paving and product, drinking fountain, bench, etc).
F. Comply with manufacturer's written installation instructions unless more stringent requirements are indicated. Complete field assembly of site furnishings where required.
206
Westacre Park Expansion and Renovation Project Section 02470 September 2024 Site Furnishings
02470-6
G. All products to be installed according the manufacturers' specifications. If discrepancies occur, notify Owner's Representative as soon as possible before proceeding with installation.
H. Contractor to repair, repaint all minor damage during installation.
3.04 PROTECTION OF EXISTING IMPROVEMENTS
Contractor shall protect all existing improvements from damage. All disturbed turf areas shall be fine graded filling all depressions, wheel ruts and irregularities and shall be reseeded with seed mix specified by the Landscape Architect. Contractor shall make all repairs and restore all damaged turf areas at his sole expense.
3.05 CLEAN-UP
A. After completing site furnishing installation, inspect components. Remove spots, dirt, and debris. Repair damaged finishes to match original finish or replace component.
B. Contractor shall clean up and legally dispose of all unused materials, excess soil, and debris at regular intervals throughout the duration of the work, and as directed by the Owner.
END OF SECTION
207
02630-1
Westacre Park Expansion and Renovation Project Section 02630 September 2024 Storm Drainage
SECTION 02630
STORM DRAINAGE
PART 1 GENERAL
1.01 SCOPE OF WORK
A. Furnish all labor, material, equipment and services necessary to provide all work, complete in place, as indicated on Drawings and specified herein.
Work specified in this Section includes, but is not limited to the following:
1. Storm drainage piping, fittings, and accessories.
2. Connection of drainage system to existing drainage system.
3. Inlets.
B. Related Work Specified in Other Sections
1. SECTION 02324 – TRENCHING
C. Related Documents
1. ASTM:
a. ASTM D 3034 - Standard Specification for Type PSM Poly Vinyl Chloride (PVC) Sewer Pipe and Fittings; 2004a.
b. ASTM D 2321 - Standard Practice for Underground Installation of Thermoplastic Pipe for Sewers and Other Gravity-Flow Applications; 2005.
1.02 SUBMITTALS
A. See Section 01330 - SUBMITTAL PROCEDURES.
B. Product Data: Provide data acknowledging that products meet requirements of standards referenced.
C. Manufacturer's Installation Instructions: Indicate special procedures required to install Products specified.
D. Manufacturer's Certificate: Certify that products meet or exceed specified requirements.
208
02630-2
Westacre Park Expansion and Renovation Project Section 02630 September 2024 Storm Drainage
E. Project Record Documents:
1. Record location of pipe runs, connections, inlets, manholes and invert elevations.
2. Identify and describe unexpected variations to subsoil conditions or discovery of uncharted utilities.
1.03 DELIVERY, STORAGE AND HANDLING
A. Do not store plastic structures, pipe and fittings in direct sunlight.
B. Protect pipe, fittings, and seals from dirt and damage.
C. Handle precast concrete pipe, manholes and other precast structures according to manufacturer’s written instructions.
D. Protect imported bedding and backfill material from contamination by other materials.
PART 2 PRODUCTS
2.01 DRAINAGE PIPE MATERIALS
A. Plastic Pipe: ADS N-12, AASHTO M52 or approved equal, inside nominal diameter as indicated on Drawings.
B. Plastic Pipe Joint Seals: Pipe shall be joined using a bell & spigot joint meeting the requirements of AASHTO M252, AASHTO M294, or ASTM F2306.
C. Fittings: Same material as pipe molded or formed to suit pipe size and end design, in required tee, bends, elbows, cleanouts, reducers, traps and other configurations required. Fittings shall conform to AASHTO M252, AASHTO M294, or ASTM F2306. Bell and spigot connections shall utilize a welded bell and valley or saddle gasket meeting the soil-tight joint performance requirements of AASHTO M252, AASHTO M294, or ASTM F2306.
2.02 PIPE ACCESSORIES
A. Line Marker: Provide warning detectable tape; permanent, bright-colored, continuous-printed plastic tape, intended for direct burial service; not less than 6 inches wide by 4 mils thick. Provide green tape with "CAUTION STORM LINE BURIED BELOW" in black letters.
2.03 CATCH BASINS
A. Drainage Sumps in turf & non-turf areas: 12” or as indicated on Drawings.
B. Catch Basins with Drain inlets in splash ground areas: 12” or as indicated on Splash Ground Drawings
209
02630-3
Westacre Park Expansion and Renovation Project Section 02630 September 2024 Storm Drainage
2.04 FLARED END SECTION
B. Flared end section: Precast concrete as indicated on Drawings. Hanson Pipe & Precast or approved equivalent.
2.05 BEDDING, COVER AND GALLERY MATERIALS
A. Pipe Bedding Material: As specified in Section 02324 – TRENCHING.
B. Pipe Cover Material: As specified in Section 02324 – TRENCHING.
C. Gallery Material: As specified per Civil Plan
PART 3 EXECUTION
3.01 TRENCHING
A. See Section 02324 – TRENCHING for additional requirements.
B. Hand trim excavation for accurate placement of pipe to elevations indicated.
C. Backfill around sides and to top of pipe with cover fill, tamp in place and compact, then complete backfilling.
3.02 INSTALLATION - PIPE
A. Lay piping beginning at low point of system, true to grades and alignment indicated on Drawings, with unbroken continuity of invert.
B. Install pipe, fittings, and accessories in accordance with manufacturer’sinstructions.
Seal watertight.
1. Plastic Pipe: Also comply with ASTM D 2321.
C. Lay pipe to slope gradients noted on layout drawings; with maximum variation from true slope of 1/8 inch in 10 feet.
D. Install continuous line marker 18 inches above top of pipe; coordinate with Section 02324 – TRENCHING.
3.03 INSTALLATION - CATCH BASINS
A. Provide as recommended by manufacturer.
3.04 PIPE PENETRATIONS
A. For pipe penetrations through existing manholes, core through, provide gasket around pipe, grout penetration on both sides and provide a minimum of 6 inches around collar outside of the manhole or inlet structure penetration.
3.05 TAP CONNECTIONS
210
02630-4
Westacre Park Expansion and Renovation Project Section 02630 September 2024 Storm Drainage
A. Make connections to existing piping and underground structures so that finished Work will conform as nearly as practicable to requirements specified for new Work.
B. Into underground structures or pipes 24 inches and larger: Cut opening into unit sufficiently large to allow 3 inches of concrete to be packed around entering connection. Cut ends of connection passing through pipe or structure wall to conform to shape of and be flush with inside wall. On outside of pipe or structure wall, encase entering connection in 6 inches of concrete for minimum length of 12 inches to provide additional support of collar from connection to undisturbed ground. Provide 3000 pounds per square inch concrete. Use epoxy bonding compound as interface between new and existing concrete and piping materials.
C. Take care while making tap connections to prevent concrete or debris from entering existing pipe or structure. Remove debris, concrete, or other extraneous material, which may accumulate.
3.06 CLEANING
A. Clean pipe to be tested by propelling a snug fitting inflated rubber ball through the pipe with water to remove any debris.
3.07 LEAK TESTING
A. Testing of all portions of the storm drain system including manholes is required.
B. For either exfiltration or infiltration test, the maximum leakage shall not exceed 250 gallons per inch of pipe diameter per mile per 24 hours as measured over a period of 30 minutes minimum. Should the leakage exceed the maximum allowable rate, the contractor shall repair, overhaul, or rebuild the defective portion of the sewer line.
After repairs have been completed by the Contractor, the line shall be retested as specified above.
C. Manholes shall be filled with water to the rim of the frame casting and shall lose no more than 2 inches over a period of 30 minutes.
D. The final test shall be performed after the line has been laid and all backfill placed and compacted. The Contractor, at his option, may test the line at any time during construction. However, the final test for acceptance shall be made only after all backfill is in place and compacted. In the event that the exfiltration test prescribed above is impractical due to wet trench conditions, these portions of the storm drain line where such conditions are encountered will be tested for infiltration. The Owner’s Representative shall determine whether the exfiltration or infiltration test will be used.
E. Even though the test for leakage is within the prescribed limits, the Contractor shall repair any obvious leaks.
F. Low pressure air testing may be used in lieu of water testing at the option of the 211
02630-5
Westacre Park Expansion and Renovation Project Section 02630 September 2024 Storm Drainage
Contractor. Water testing may be required by the Owner’s Representative. The following procedure shall be used for air testing:
1. Plug all pipe outlets with suitable test plugs. Brace each plug securely.
2. If the pipe to be tested is submerged in ground water, insert a pipe probe, by boring or jetting, into the backfill material adjacent to the center of the pipe, and determine the pressure in the probe when air passes slowly through it. This is the back pressure due to ground water submergence over the end of the probe. All gauge pressures in the test should be increased by this amount.
3. Add air slowly to the portion of the pipe installation under test until the internal pressure is raised to 5.0 psig.
4. Check exposed pipe and plugs for abnormal leakage by coating with a soap solution. If any leakage is observed, bleed off air and make necessary repairs.
5. After an internal pressure of 5.0 psig. is obtained, allow at least two minutes for air temperature to stabilize, adding only the amount of air required to maintain pressure.
6. After the two minute period, disconnect the air supply and start stopwatch. The pressure of 5.0 psig. shall be maintained for 5 minutes.
7. As an alternate, the contractor may request the air testing procedure as presented in Section 306-1.4.4 of the 1997 edition of the “Greenbook” Standard Specifications.
3.08 DEFLECTION TESTING (PIPES GREATER THAN 8 INCHES ONLY) A. After pipe installation and placement and compaction of backfill, but prior to placement of pavement, all PVC and HDPE pipe shall be cleaned and then mandrel tested for obstructions, such as, but not limited to, deflections, joint offsets and lateral pipe intrusions. A rigid mandrel shall be pulled through the pipe by hand. The minimum length of the circular portion of the mandrel shall be equal to the nominal diameter of the pipe. All obstructions encountered by the mandrel shall be corrected by the Contractor. Obstructions due to deflection shall be corrected by replacement of the overdeflected pipe. Mechanical re-rounding is not permitted.
B. If a section of pipe fails to meet the mandrel test and is reinstalled and fails the second time, said section(s) of pipe shall be replaced with rigid pipe material approved by the Owner’s Representative.
3.09 DISPOSAL
A. Lawfully dispose of all unsuitable and excess or surplus material off-site at no cost to the Owner.
END OF SECTION
212
Westacre Park Expansion and Renovation Project Section 02721 September 2024 Aggregate Base Course
02721-1
SECTION 02721
AGGREGATE BASE COURSE – SITE CONCRETE PAVING AND FOOTINGS PART 1 GENERAL
1.01 SECTION INCLUDES
A. Aggregate base course.
B. Paving aggregates.
1.02 RELATED SECTIONS
A. Section 02260 – Landscape Grading.
B. Section 02316 - Fill and Backfill.
C. Special Provisions: Aggregate Base, Asphalt Concrete, Storm Drain Pipe, Sanitary Sewer, Sewer and Storm Drain Manholes, Potable Water Supply and Miscellaneous Concrete Construction
D. Section 02515 – Site Concrete
E. Section 02811 – Irrigation: Trenching and Backfill
1.03 REFERENCES
A. ASTM C 136 - Standard Test Method for Sieve Analysis of Fine and Coarse Aggregates; 1996a.
B. ASTM D 1557 Test Method for Laboratory Compaction Characteristics of Soil Using Modified Effort (56,000 ft-lbf/ft3 (2,700 kN m/m3)); 1991 (Reapproved 1998).
C. ASTM D 2487 - Standard Classification of Soils for Engineering Purposes (Unified Soil Classification System); 1998.
D. ASTM D 2922 - Standard Test Methods for Density of Soil and Soil-Aggregate in Place by Nuclear Methods (Shallow Depth); 1996.
E. ASTM D 3017 - Standard Test Method for Water Content of Soil and Rock in Place by Nuclear Methods (Shallow Depth); 1996.
1.04 SUBMITTALS
A. Materials Sources: Submit name of imported materials source.
B. Aggregate Composition Test Reports: Results of laboratory tests on proposed and actual materials used.
C. Compaction Density Test Reports.
1.05 PROJECT CONDITIONS
A. Provide sufficient quantities of aggregate to meet project schedule and requirements. 213
Westacre Park Expansion and Renovation Project Section 02721 September 2024 Aggregate Base Course
02721-2
When necessary, store materials on site in advance of need.
B. Verify that survey benchmarks and intended elevations for the Work are as indicated.
PART 2 PRODUCTS
2.01 MATERIALS
A. Aggregate Base: Coarse aggregate, conforming to Section 26 of the State of California Highway Department Standards for 3/8-inch maximum Class 2 Aggregate Base.
2.02 SOURCE QUALITY CONTROL
A. If tests indicate materials do not meet specified requirements, change material and retest.
B. Provide materials of each type from same source throughout the Work.
PART 3 EXECUTION
3.01 EXAMINATION
A. Verify subgrade has been inspected, gradients and elevations are correct, and is moist but not pumping.
3.02 PREPARATION
A. Correct irregularities in subgrade gradient and elevation by scarifying, reshaping, and re-compacting.
C.Do not place aggregate on soft, muddy, or frozen surfaces.
3.03 INSTALLATION
A. Under Concrete Paving and Footings:
1. Place aggregate base to a total compacted thickness as indicated on the Project Drawings.
2. Compact to 95 percent of maximum dry density.
3.04 TOLERANCES
A. Variation From Design Elevation: Within 0.05 feet.
3.05 FIELD QUALITY CONTROL
A. Compaction density testing will be performed on compacted aggregate base course in 214
Westacre Park Expansion and Renovation Project Section 02721 September 2024 Aggregate Base Course
02721-3
accordance with ASTM D2922 and ASTM D3017.
B. If tests indicate work does not meet specified requirements, remove work, replace and retest.
C. Proof roll compacted aggregate at surfaces that will be under paving.
3.06 CLEAN-UP
A.Remove unused stockpiled materials, leave area in a clean and neat condition in accordance with Section 02260.
END OF SECTION
215
02630-1
Westacre Park Expansion and Renovation Project Section 02630 September 2024 Storm Drainage
SECTION 02630
STORM DRAINAGE
PART 1 GENERAL
1.01 SCOPE OF WORK
A. Furnish all labor, material, equipment and services necessary to provide all work, complete in place, as indicated on Drawings and specified herein.
Work specified in this Section includes, but is not limited to the following:
1. Storm drainage piping, fittings, and accessories.
2. Connection of drainage system to existing drainage system.
3. Inlets.
B. Related Work Specified in Other Sections
1. SECTION 02324 – TRENCHING
C. Related Documents
1. ASTM:
a. ASTM D 3034 - Standard Specification for Type PSM Poly Vinyl Chloride (PVC) Sewer Pipe and Fittings; 2004a.
b. ASTM D 2321 - Standard Practice for Underground Installation of Thermoplastic Pipe for Sewers and Other Gravity-Flow Applications; 2005.
1.02 SUBMITTALS
A. See Section 01330 - SUBMITTAL PROCEDURES.
B. Product Data: Provide data acknowledging that products meet requirements of standards referenced.
C. Manufacturer's Installation Instructions: Indicate special procedures required to install Products specified.
D. Manufacturer's Certificate: Certify that products meet or exceed specified requirements.
216
02630-2
Westacre Park Expansion and Renovation Project Section 02630 September 2024 Storm Drainage
E. Project Record Documents:
1. Record location of pipe runs, connections, inlets, manholes and invert elevations.
2. Identify and describe unexpected variations to subsoil conditions or discovery of uncharted utilities.
1.03 DELIVERY, STORAGE AND HANDLING
A. Do not store plastic structures, pipe and fittings in direct sunlight.
B. Protect pipe, fittings, and seals from dirt and damage.
C. Handle precast concrete pipe, manholes and other precast structures according to manufacturer’s written instructions.
D. Protect imported bedding and backfill material from contamination by other materials.
PART 2 PRODUCTS
2.01 DRAINAGE PIPE MATERIALS
A. Plastic Pipe: ADS N-12, AASHTO M52 or approved equal, inside nominal diameter as indicated on Drawings.
B. Plastic Pipe Joint Seals: Pipe shall be joined using a bell & spigot joint meeting the requirements of AASHTO M252, AASHTO M294, or ASTM F2306.
C. Fittings: Same material as pipe molded or formed to suit pipe size and end design, in required tee, bends, elbows, cleanouts, reducers, traps and other configurations required. Fittings shall conform to AASHTO M252, AASHTO M294, or ASTM F2306. Bell and spigot connections shall utilize a welded bell and valley or saddle gasket meeting the soil-tight joint performance requirements of AASHTO M252, AASHTO M294, or ASTM F2306.
2.02 PIPE ACCESSORIES
A. Line Marker: Provide warning detectable tape; permanent, bright-colored, continuous-printed plastic tape, intended for direct burial service; not less than 6 inches wide by 4 mils thick. Provide green tape with "CAUTION STORM LINE BURIED BELOW" in black letters.
2.03 CATCH BASINS
A. Drainage Sumps in turf & non-turf areas: 12” or as indicated on Drawings.
B. Catch Basins with Drain inlets in splash ground areas: 12” or as indicated on Splash Ground Drawings
217
02630-3
Westacre Park Expansion and Renovation Project Section 02630 September 2024 Storm Drainage
2.04 FLARED END SECTION
B. Flared end section: Precast concrete as indicated on Drawings. Hanson Pipe & Precast or approved equivalent.
2.05 BEDDING, COVER AND GALLERY MATERIALS
A. Pipe Bedding Material: As specified in Section 02324 – TRENCHING.
B. Pipe Cover Material: As specified in Section 02324 – TRENCHING.
C. Gallery Material: As specified per Civil Plan
PART 3 EXECUTION
3.01 TRENCHING
A. See Section 02324 – TRENCHING for additional requirements.
B. Hand trim excavation for accurate placement of pipe to elevations indicated.
C. Backfill around sides and to top of pipe with cover fill, tamp in place and compact, then complete backfilling.
3.02 INSTALLATION - PIPE
A. Lay piping beginning at low point of system, true to grades and alignment indicated on Drawings, with unbroken continuity of invert.
B. Install pipe, fittings, and accessories in accordance with manufacturer’sinstructions.
Seal watertight.
1. Plastic Pipe: Also comply with ASTM D 2321.
C. Lay pipe to slope gradients noted on layout drawings; with maximum variation from true slope of 1/8 inch in 10 feet.
D. Install continuous line marker 18 inches above top of pipe; coordinate with Section 02324 – TRENCHING.
3.03 INSTALLATION - CATCH BASINS
A. Provide as recommended by manufacturer.
3.04 PIPE PENETRATIONS
A. For pipe penetrations through existing manholes, core through, provide gasket around pipe, grout penetration on both sides and provide a minimum of 6 inches around collar outside of the manhole or inlet structure penetration.
3.05 TAP CONNECTIONS
218
02630-4
Westacre Park Expansion and Renovation Project Section 02630 September 2024 Storm Drainage
A. Make connections to existing piping and underground structures so that finished Work will conform as nearly as practicable to requirements specified for new Work.
B. Into underground structures or pipes 24 inches and larger: Cut opening into unit sufficiently large to allow 3 inches of concrete to be packed around entering connection. Cut ends of connection passing through pipe or structure wall to conform to shape of and be flush with inside wall. On outside of pipe or structure wall, encase entering connection in 6 inches of concrete for minimum length of 12 inches to provide additional support of collar from connection to undisturbed ground. Provide 3000 pounds per square inch concrete. Use epoxy bonding compound as interface between new and existing concrete and piping materials.
C. Take care while making tap connections to prevent concrete or debris from entering existing pipe or structure. Remove debris, concrete, or other extraneous material, which may accumulate.
3.06 CLEANING
A. Clean pipe to be tested by propelling a snug fitting inflated rubber ball through the pipe with water to remove any debris.
3.07 LEAK TESTING
A. Testing of all portions of the storm drain system including manholes is required.
B. For either exfiltration or infiltration test, the maximum leakage shall not exceed 250 gallons per inch of pipe diameter per mile per 24 hours as measured over a period of 30 minutes minimum. Should the leakage exceed the maximum allowable rate, the contractor shall repair, overhaul, or rebuild the defective portion of the sewer line.
After repairs have been completed by the Contractor, the line shall be retested as specified above.
C. Manholes shall be filled with water to the rim of the frame casting and shall lose no more than 2 inches over a period of 30 minutes.
D. The final test shall be performed after the line has been laid and all backfill placed and compacted. The Contractor, at his option, may test the line at any time during construction. However, the final test for acceptance shall be made only after all backfill is in place and compacted. In the event that the exfiltration test prescribed above is impractical due to wet trench conditions, these portions of the storm drain line where such conditions are encountered will be tested for infiltration. The Owner’s Representative shall determine whether the exfiltration or infiltration test will be used.
E. Even though the test for leakage is within the prescribed limits, the Contractor shall repair any obvious leaks.
F. Low pressure air testing may be used in lieu of water testing at the option of the 219
02630-5
Westacre Park Expansion and Renovation Project Section 02630 September 2024 Storm Drainage
Contractor. Water testing may be required by the Owner’s Representative. The following procedure shall be used for air testing:
1. Plug all pipe outlets with suitable test plugs. Brace each plug securely.
2. If the pipe to be tested is submerged in ground water, insert a pipe probe, by boring or jetting, into the backfill material adjacent to the center of the pipe, and determine the pressure in the probe when air passes slowly through it. This is the back pressure due to ground water submergence over the end of the probe. All gauge pressures in the test should be increased by this amount.
3. Add air slowly to the portion of the pipe installation under test until the internal pressure is raised to 5.0 psig.
4. Check exposed pipe and plugs for abnormal leakage by coating with a soap solution. If any leakage is observed, bleed off air and make necessary repairs.
5. After an internal pressure of 5.0 psig. is obtained, allow at least two minutes for air temperature to stabilize, adding only the amount of air required to maintain pressure.
6. After the two minute period, disconnect the air supply and start stopwatch. The pressure of 5.0 psig. shall be maintained for 5 minutes.
7. As an alternate, the contractor may request the air testing procedure as presented in Section 306-1.4.4 of the 1997 edition of the “Greenbook” Standard Specifications.
3.08 DEFLECTION TESTING (PIPES GREATER THAN 8 INCHES ONLY) A. After pipe installation and placement and compaction of backfill, but prior to placement of pavement, all PVC and HDPE pipe shall be cleaned and then mandrel tested for obstructions, such as, but not limited to, deflections, joint offsets and lateral pipe intrusions. A rigid mandrel shall be pulled through the pipe by hand. The minimum length of the circular portion of the mandrel shall be equal to the nominal diameter of the pipe. All obstructions encountered by the mandrel shall be corrected by the Contractor. Obstructions due to deflection shall be corrected by replacement of the overdeflected pipe. Mechanical re-rounding is not permitted.
B. If a section of pipe fails to meet the mandrel test and is reinstalled and fails the second time, said section(s) of pipe shall be replaced with rigid pipe material approved by the Owner’s Representative.
3.09 DISPOSAL
A. Lawfully dispose of all unsuitable and excess or surplus material off-site at no cost to the Owner.
END OF SECTION
220
Westacre Park Expansion and Renovation Project Section 02721 September 2024 Aggregate Base Course
02721-1
SECTION 02721
AGGREGATE BASE COURSE – SITE CONCRETE PAVING AND FOOTINGS PART 1 GENERAL
1.01 SECTION INCLUDES
A. Aggregate base course.
B. Paving aggregates.
1.02 RELATED SECTIONS
A. Section 02260 – Landscape Grading.
B. Section 02316 - Fill and Backfill.
C. Special Provisions: Aggregate Base, Asphalt Concrete, Storm Drain Pipe, Sanitary Sewer, Sewer and Storm Drain Manholes, Potable Water Supply and Miscellaneous Concrete Construction
D. Section 02515 – Site Concrete
E. Section 02811 – Irrigation: Trenching and Backfill
1.03 REFERENCES
A. ASTM C 136 - Standard Test Method for Sieve Analysis of Fine and Coarse Aggregates; 1996a.
B. ASTM D 1557 Test Method for Laboratory Compaction Characteristics of Soil Using Modified Effort (56,000 ft-lbf/ft3 (2,700 kN m/m3)); 1991 (Reapproved 1998).
C. ASTM D 2487 - Standard Classification of Soils for Engineering Purposes (Unified Soil Classification System); 1998.
D. ASTM D 2922 - Standard Test Methods for Density of Soil and Soil-Aggregate in Place by Nuclear Methods (Shallow Depth); 1996.
E. ASTM D 3017 - Standard Test Method for Water Content of Soil and Rock in Place by Nuclear Methods (Shallow Depth); 1996.
1.04 SUBMITTALS
A. Materials Sources: Submit name of imported materials source.
B. Aggregate Composition Test Reports: Results of laboratory tests on proposed and actual materials used.
C. Compaction Density Test Reports.
1.05 PROJECT CONDITIONS
A. Provide sufficient quantities of aggregate to meet project schedule and requirements. 221
Westacre Park Expansion and Renovation Project Section 02721 September 2024 Aggregate Base Course
02721-2
When necessary, store materials on site in advance of need.
B. Verify that survey benchmarks and intended elevations for the Work are as indicated.
PART 2 PRODUCTS
2.01 MATERIALS
A. Aggregate Base: Coarse aggregate, conforming to Section 26 of the State of California Highway Department Standards for 3/8-inch maximum Class 2 Aggregate Base.
2.02 SOURCE QUALITY CONTROL
A. If tests indicate materials do not meet specified requirements, change material and retest.
B. Provide materials of each type from same source throughout the Work.
PART 3 EXECUTION
3.01 EXAMINATION
A. Verify subgrade has been inspected, gradients and elevations are correct, and is moist but not pumping.
3.02 PREPARATION
A. Correct irregularities in subgrade gradient and elevation by scarifying, reshaping, and re-compacting.
C.Do not place aggregate on soft, muddy, or frozen surfaces.
3.03 INSTALLATION
A. Under Concrete Paving and Footings:
1. Place aggregate base to a total compacted thickness as indicated on the Project Drawings.
2. Compact to 95 percent of maximum dry density.
3.04 TOLERANCES
A. Variation From Design Elevation: Within 0.05 feet.
3.05 FIELD QUALITY CONTROL
A. Compaction density testing will be performed on compacted aggregate base course in 222
Westacre Park Expansion and Renovation Project Section 02721 September 2024 Aggregate Base Course
02721-3
accordance with ASTM D2922 and ASTM D3017.
B. If tests indicate work does not meet specified requirements, remove work, replace and retest.
C. Proof roll compacted aggregate at surfaces that will be under paving.
3.06 CLEAN-UP
A.Remove unused stockpiled materials, leave area in a clean and neat condition in accordance with Section 02260.
END OF SECTION
223
Westacre Park Expansion and Renovation Project Section 02764 September 2024 Pavement Joint Sealants
02764-1
SECTION 02764
PAVEMENT JOINT SEALANTS
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section.
1.2 SUMMARY
A. This Section includes the following:
1. Expansion and contraction joints within cement concrete pavement.
2. Joints between cement concrete and asphalt pavement.
B. Related Sections include the following:
1. Section 02515 Site Concrete for constructing joints in concrete pavement.
1.3 SUBMITTALS
A. Product Data: For each joint-sealant product indicated.
B. Samples for Verification: For each type and color of joint sealant required. Install joint-sealant samples in 1/2-inch- (13-mm-) wide joints formed between two 6- inch- (150-mm-) long strips of material matching the appearance of exposed surfaces adjacent to joint sealants.
C. Qualification Data: For Installer and testing agency.
1.4 QUALITY ASSURANCE
A. Installer Qualifications: An employer of workers trained and approved by manufacturer.
B. Source Limitations: Obtain each type of joint sealant through one source from a single manufacturer.
224
Westacre Park Expansion and Renovation Project Section 02764 September 2024 Pavement Joint Sealants
02764-2
1.5 DELIVERY, STORAGE, AND HANDLING
A. Deliver materials to Project site in original unopened containers or bundles with labels indicating manufacturer, product name and designation, color, expiration date, pot life, curing time, and mixing instructions for multi-component materials.
B. Store and handle materials to comply with manufacturer's written instructions to prevent their deterioration or damage due to moisture, high or low temperatures, contaminants, or other causes.
1.6 PROJECT CONDITIONS
A. Do not proceed with installation of joint sealants under the following conditions:
1. When ambient and substrate temperature conditions are outside limits permitted by joint-sealant manufacturer.
2. When joint substrates are wet or covered with frost.
3. Where joint widths are less than those allowed by joint-sealant manufacturer for applications indicated.
4. Where contaminants capable of interfering with adhesion have not yet been removed from joint substrates.
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. Available Products: Subject to compliance with requirements, products that may be incorporated into the Work include, but are not limited to, products listed in other Part 2 articles.
2.2 MATERIALS, GENERAL
A. Compatibility: Provide joint sealants, backing materials, and other related materials that are compatible with one another and with joint substrates under conditions of service and application, as demonstrated by joint-sealant manufacturer based on testing and field experience.
B. Colors of Exposed Joint Sealants: As selected by Landscape Architect from manufacturer's full range.
225
Westacre Park Expansion and Renovation Project Section 02764 September 2024 Pavement Joint Sealants
02764-3
2.3 COLD-APPLIED JOINT SEALANTS
A. Multicomponent Jet-Fuel-Resistant Sealant for Concrete: Pourable, chemically curing elastomeric formulation complying with the following requirements for formulation and with ASTM C 920 for type, grade, class, and uses indicated:
1. Urethane Formulation: Type M; Grade P; Class 12-1/2; Uses T, M, and, as applicable to joint substrates indicated, O.
a. Products:
1) Pecora Corporation; Urexpan NR-300.
2. Coal-Tar-Modified Polymer Formulation: Type M; Grade P; Class 25; Uses T and, as applicable to joint substrates indicated, O.
a. Products:
1) Meadows, W. R., Inc.; Sealtight Gardox.
3. Bitumen-Modified Urethane Formulation: Type M; Grade P; Class 25; Uses T, M, and, as applicable to joint substrates indicated, O. a. Products:
1) Tremco Sealant/Waterproofing Division; Vulkem 202.
B. Single-Component Jet-Fuel-Resistant Urethane Sealant for Concrete: Singlecomponent, pourable, coal-tar-modified, urethane formulation complying with ASTM C 920 for Type S; Grade P; Class 25; Uses T, M, and, as applicable to joint substrates indicated, O.
1. Products:
a. Sonneborn, Div. of ChemRex, Inc.; Sonomeric 1.
C. Type NS Silicone Sealant for Concrete: Single-component, low-modulus, neutralcuring, nonsag silicone sealant complying with ASTM D 5893 for Type NS.
1. Products:
a. Crafco Inc.; RoadSaver Silicone.
b. Dow Corning Corporation; 888.
226
Westacre Park Expansion and Renovation Project Section 02764 September 2024 Pavement Joint Sealants
02764-4
D. Type SL Silicone Sealant for Concrete and Asphalt: Single-component, lowmodulus, neutral-curing, self-leveling silicone sealant complying with ASTM D 5893 for Type SL.
1. Products:
a. Crafco Inc.; RoadSaver Silicone SL.
b. Dow Corning Corporation; 890-SL.
E. Multicomponent Low-Modulus Sealant for Concrete and Asphalt: Proprietary formulation consisting of reactive petropolymer and activator components producing a pourable, self-leveling sealant.
1. Products:
a. Meadows, W. R., Inc.; Sof-Seal.
2.4 HOT-APPLIED JOINT SEALANTS
A. Jet-Fuel-Resistant Elastomeric Sealant for Concrete: Single-component formulation complying with ASTM D 3569.
1. Products:
a. Crafco Inc.; Superseal 444/777.
b. Meadows, W. R., Inc.; Poly-Jet 3569.
B. Jet-Fuel-Resistant Sealant for Concrete and Tar Concrete: Single-component formulation complying with ASTM D 3581.
1. Products:
a. Crafco Inc.; Superseal 1614A.
b. Meadows, W. R., Inc.; Poly-Jet 1614.
c. Meadows, W. R., Inc.; Poly-Jet 3406.
d. Meadows, W. R., Inc.; Poly-Jet 3569.
C. Elastomeric Sealant for Concrete: Single-component formulation complying with ASTM D 3406.
1. Products:
a. Crafco Inc.; Superseal 444/777.
b. Meadows, W. R., Inc.; Poly-Jet 3406.
227
Westacre Park Expansion and Renovation Project Section 02764 September 2024 Pavement Joint Sealants
02764-5
D. Sealant for Concrete and Asphalt: Single-component formulation complying with ASTM D 3405.
1. Products:
a. Koch Materials Company; Product No. 9005.
b. Koch Materials Company; Product No. 9030.
c. Meadows, W. R., Inc.; Sealtight Hi-Spec.
2.5 JOINT-SEALANT BACKER MATERIALS
A. General: Provide joint-sealant backer materials that are nonstaining; are compatible with joint substrates, sealants, primers, and other joint fillers; and are approved for applications indicated by joint-sealant manufacturer based on field experience and laboratory testing.
B. Round Backer Rods for Cold- and Hot-Applied Sealants: ASTM D 5249, Type 1, of diameter and density required to control sealant depth and prevent bottom-side adhesion of sealant.
C. Backer Strips for Cold- and Hot-Applied Sealants: ASTM D 5249; Type 2; of thickness and width required to control sealant depth, prevent bottom-side adhesion of sealant, and fill remainder of joint opening under sealant.
D. Round Backer Rods for Cold-Applied Sealants: ASTM D 5249, Type 3, of diameter and density required to control sealant depth and prevent bottom-side adhesion of sealant.
2.6 PRIMERS
A. Primers: Product recommended by joint-sealant manufacturer where required for adhesion of sealant to joint substrates indicated, as determined from preconstruction joint-sealant-substrate tests and field tests.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine joints indicated to receive joint sealants, with Installer present, for compliance with requirements for joint configuration, installation tolerances, and other conditions affecting joint-sealant performance.
1. Proceed with installation only after unsatisfactory conditions have been corrected.
228
Westacre Park Expansion and Renovation Project Section 02764 September 2024 Pavement Joint Sealants
02764-6
3.2 PREPARATION
A. Surface Cleaning of Joints: Clean out joints immediately before installing joint sealants to comply with joint-sealant manufacturer's written instructions.
B. Joint Priming: Prime joint substrates where indicated or where recommended in writing by joint-sealant manufacturer, based on preconstruction joint-sealantsubstrate tests or prior experience. Apply primer to comply with joint-sealant manufacturer's written instructions. Confine primers to areas of joint-sealant bond; do not allow spillage or migration onto adjoining surfaces.
3.3 INSTALLATION OF JOINT SEALANTS
A. General: Comply with joint-sealant manufacturer's written installation instructions for products and applications indicated, unless more stringent requirements apply.
B. Sealant Installation Standard: Comply with recommendations in ASTM C 1193 for use of joint sealants as applicable to materials, applications, and conditions indicated.
C. Install backer materials of type indicated to support sealants during application and at position required to produce cross-sectional shapes and depths of installed sealants relative to joint widths that allow optimum sealant movement capability.
1. Do not leave gaps between ends of backer materials.
2. Do not stretch, twist, puncture, or tear backer materials.
3. Remove absorbent backer materials that have become wet before sealant application and replace them with dry materials.
D. Install sealants using proven techniques that comply with the following and at the same time backings are installed:
1. Place sealants so they directly contact and fully wet joint substrates.
2. Completely fill recesses provided for each joint configuration.
3. Produce uniform, cross-sectional shapes and depths relative to joint widths that allow optimum sealant movement capability.
E. Tooling of Nonsag Sealants: Immediately after sealant application and before skinning or curing begins, tool sealants according to requirements specified below to form smooth, uniform beads of configuration indicated; to eliminate air pockets; and to ensure contact and adhesion of sealant with sides of joint.
1. Remove excess sealants from surfaces adjacent to joint.
2. Use tooling agents that are approved in writing by joint-sealant manufacturer and that do not discolor sealants or adjacent surfaces. 229
Westacre Park Expansion and Renovation Project Section 02764 September 2024 Pavement Joint Sealants
02764-7
F. Provide joint configuration to comply with joint-sealant manufacturer's written instructions, unless otherwise indicated.
G. Provide recessed joint configuration for silicone sealants of recess depth and at locations indicated.
3.4 CLEANING
A. Clean off excess sealants or sealant smears adjacent to joints as the Work progresses by methods and with cleaning materials approved by manufacturers of joint sealants and of products in which joints occur.
3.5 PROTECTION
A. Protect joint sealants during and after curing period from contact with contaminating substances and from damage resulting from construction operations or other causes so sealants are without deterioration or damage at time of Substantial Completion. If, despite such protection, damage or deterioration occurs, cut out and remove damaged or deteriorated joint sealants immediately and replace with joint sealant so installations with repaired areas are indistinguishable from the original work.
END OF SECTION
230
Westacre Park Expansion and Renovation Project Section 02811 September 2024 Irrigation
02811 - 1
SECTION 02811
IRRIGATION
PART 1 - GENERAL
1.01 CONDITIONS
A. The general provisions of the Contract, including General and Supplementary Conditions and Special Provisions (if any) apply to the work specified in this Section.
1.02 SCOPE OF WORK
A. Furnish all labor, materials, processes, and equipment necessary to complete the irrigation system work as indicated on the Drawings and specified herein.
B. Test the entire irrigation system to assure proper operation.
C. Furnish all labor, materials, and equipment necessary to restore all disturbed areas resulting from the work as indicated on the Drawings and specified herein.
D. All incidental parts, which are not shown on the plans or specified herein and are necessary to complete or modify the existing system shall be furnished and installed as though such parts were shown on plans or specifications. All systems shall be in satisfactory operation at the time of completion.
1. Related work specified in other sections:
a. Section 01600 – PRODUCT REQUIREMENTS
b. Section 01780 - CLOSEOUT SUBMITTALS
c. Section 02100 - DEMOLITION
d. Section 02905 - LANDSCAPE INSTALLATION
e. Section 02970 - LANDSCAPE MAINTENANCE
1.03 QUALITY ASSURANCE & REQUIREMENTS
A. Permits and Fees: The Contractor shall obtain and pay for all permits and all observations as required.
B. Manufacturer's Directions: Manufacturer's directions and detailed Drawings shall be followed in all cases where the manufacturers of articles used in this Contract furnish directions covering points not shown in the Drawings and Specifications C. Ordinances and Regulations
231
Westacre Park Expansion and Renovation Project Section 02811 September 2024 Irrigation
02811 - 2
A. All local, municipal and state laws, rules and regulations governing or relating to any portion of this work are hereby incorporated into and made a part of these Specifications and their provisions shall be carried out by the Contractor.
B. All rules and regulations governing or relating to the California Code of Regulations, Title 23, Division 2, Chapter 2.7, 2015 Updated Model Water Efficient Landscape Ordinance are hereby incorporated into and made a part of these Specifications and their provisions shall be carried out by the Contractor.
C. The materials and work of this section shall conform to all applicable provisions of the latest editions of the Uniform Plumbing Code, the National Electrical Code, and all codes properly governing the materials and work at the project site.
D. All electrical materials and work shall conform to California Administrative Code, Title 23, Part 3, Basic Electrical Regulations, and Article 18 E 110-16.
E. Anything contained in these Specifications shall not be construed to conflict with any of the above rules and regulations or requirements of the same. However, when these Specifications and Drawings call for or describe materials, workmanship, or construction of a better quality, higher standard, or larger size than is required by the above rules and regulations, the provisions of the Specifications and Drawings shall take precedence.
D. Explanation of Drawings
1. Not all offsets, fittings, sleeves, main line, lateral, etc., which may be required are shown on plans. Carefully investigate the structural and finish conditions affecting all the work and plan the work accordingly furnishing such fittings; etc., as may be required to meet such conditions. Drawings are generally diagrammatic and indicative of the work to be installed. Due to the scale of the Drawings, it is not possible to indicate all offsets, fittings, sleeves, etc., which may be required to complete the irrigation system.
2. Before proceeding with any work, the Contractor shall check and verify all dimensions, quantities, pressures and flows and shall immediately inform the District of any discrepancy between the drawing and/or the Specifications and actual conditions. No work shall be done in any area where there is such a discrepancy until the District has given written approval for the same. The Contractor shall assume full responsibility for work installed without approval.
3. The materials and work shall be installed in such a manner as to avoid conflicts between irrigation system and planting, existing or proposed utilities, and all other construction features.
4. Contractor shall verify prior to and during construction, that his contract documents reflect the latest revisions and change orders. Contractor shall be able to produce such documents at the request of the District.
5. Pipe sizes indicated on the Drawings are minimum allowable.
1.04 EXISTING CONDITIONS
232
Westacre Park Expansion and Renovation Project Section 02811 September 2024 Irrigation
02811 - 3
A. The Contractor shall exercise due care to protect all existing facilities, structures and utilities both above ground and underground on the site.
B. The contractor shall also exert every effort to maintain amenities, including specimen tress and natural areas integral to the aesthetic of the park design.
C. Information on the Drawings, relative to existing conditions, is approximate only.
Deviations found necessary during construction to conform to actual conditions, as approved by the District, shall be made without additional cost.
D. Where it is necessary to excavate in areas of existing utilities, the contractor shall pothole to confirm exact locations of existing utilities. Exercise extreme care in excavating and working near existing utilities. The Contractor shall be responsible for all damages to existing utilities that are caused by his operation or neglect. In case of interruption of utilities caused by the contractor’s operations or neglect, the contractor shall be responsible to have the utilities in service as soon as possible and in no case shall the interruption be longer than a twenty-four (24) hour period. In such case that the contractor needs more than a twenty-four (24) hour period, prior approval shall be acquired from the District in writing.
E. Excavation in proximity to existing trees shall conform to the Tree Protection Measures per Contract Documents.
1.05 EXISTING IRRIGATION SYSTEM
A. All existing sprinklers, rotors, controllers, quick coupler valves, undamaged utility boxes, remote control valves, isolation valves shall be removed and salvaged by the Contractor. Deliver only salvageable items to District maintenance yard in stackable plastic bins. All salvaged products shall be inventoried by Contractor prior to delivery. All other items shall be disposed of by the Contractor.
B. Existing pipelines shall be abandoned in place except in those areas designated to retain and protect. If an existing irrigation pipe is encountered during the installation of new pipe, a section of the existing pipe shall be cut and removed. Remove two (2) feet of the existing pipeline on both sides of the new pipe and/or to a depth of eighteen (18) inches, whichever comes first.
1.06 SUBMITTALS
A. Material List
1. Contractor shall furnish the articles, equipment, materials, or processes specified by name in the Drawings and Specifications. Product names are used as standards only; other materials or methods shall not be used unless approved in writing by the District. Burden of proof as to equality of proposed material shall be on the Contractor; the District's decision is final. Only one request for substitution shall be considered for each item. Equipment capacities specified are minimum acceptable.
233
Westacre Park Expansion and Renovation Project Section 02811 September 2024 Irrigation
02811 - 4
2. A complete material list (6 copies) shall be submitted to the District for approval prior to performing any work. The material list shall clearly identify the manufacturer, model number and description of materials and equipment to be used, including but not limited to the following:
a. Irrigation Controller and Accessories
b. Hand Held Remote Control
c. Isolation Valves
d. Master Valve and Flow Sensor
e. Remote Control and Drip Valves
f. 2-Wire Valve and Sensor Decoders
g. Concrete Valve Boxes and Security Lids
h. Gear Drive Rotors
i. Pop Up Sprinklers and Nozzles
j. Bubblers and Riser Assemblies
k. Drip Irrigation Tubing and Fittings
l. Swing Joint Assemblies
m. PVC Gasketed Main Line Pipe
n. Main Line Fittings and Joint Restraints
o. PVC Solvent Weld Lateral Pipe and Fittings
p. PVC and HDPE Sleeves
q. PVC Conduit
r. PVC Solvent Cement and Primer
s. 2-Wire Decoder Cable
t. Water Proof Wire Connectors
u. Controller and Decoder Earth Ground Systems
3. The contractor shall provide additional submittals as required for products not listed above but which are used on site. Approval of submittals is required before installation.
4. Equipment or materials installed or furnished without prior approval of the District shall be rejected and the Contractor shall be required to remove such materials from the site at his own expense.
5. Approval of any item, alternate or substitute indicates only that the product or products apparently meet the requirements of the Drawings and Specifications based on the information or samples submitted.
B. Record Drawings
1. The Contractor shall dimension from two (2) permanent points of reference, building corners, sidewalks, or road intersections, etc., the location of the following items:
a. Connection to Irrigation and Potable Water Lines (Note Depth) b. Electrical Power Connection and Conduits (Note Depth) c. Irrigation Controller
d. Main Line Valves – Isolation, Quick Coupler and Air Release e. Master Valves and Flow Sensors
234
Westacre Park Expansion and Renovation Project Section 02811 September 2024 Irrigation
02811 - 5
f. Remote Control and Drip Valves
g. Routing of irrigation pressure lines; dimension maximum 100' along routing and at turns in direction and utility crossovers. (Note Depth) h. Routing of conduit and 2-wire decoder cable when not adjacent to main line. i. Main Line, Lateral and Electrical Sleeves at both ends (Note Depth) j. Electric pull/splice boxes (note decoder identification addresses) k. Other related equipment as directed by the District.
2. Two (2) weeks prior to the date of the final observation, the Contractor shall deliver reproducible record drawings and digital media to the Landscape Architect for review. Delivery shall not relieve the Contractor of the responsibility of furnishing required information that may be omitted from the plans or digital media or from the requirements of the Close Out Documents.
C. Controller Charts
1. The District shall approve record Drawings before controller charts are prepared.
2. Provide one (1) controller chart for each controller supplied.
3. The chart shall show or explain the area controlled by the automatic controller and shall be the maximum size that the controller door will allow.
4. The chart shall be either a reduced drawing or a written description of the actual record drawing system. In the event the controller sequence is not legible when the drawing is reduced, it shall be enlarged to a size that is readable.
5. When completed and approved, the chart shall be hermetically sealed between two (2) pieces of plastic, each piece being a minimum ten (10) mils thick.
6. These charts shall be completed and approved prior to final observation of the irrigation system.
D. Operation and Maintenance Manuals
1. Prepare and deliver two (2) operation manuals as specified and as follows:
a. Approved irrigation material list as described in Section 1.05.A.2 b. Parts lists for approved irrigation material list.
c. Operation manuals for approved irrigation material list.
3. Guarantee Statement for Irrigation System
4. Landscape Irrigation Water Audit
E. Before final observation can occur, the above-mentioned material submittals, record drawings, controller charts, operations and maintenance manuals, guarantee statement for irrigation system, central control certificate and landscape irrigation water audit shall be turned over to the District.
235
Westacre Park Expansion and Renovation Project Section 02811 September 2024 Irrigation
02811 - 6
1.06 Equipment to be Furnished:
A. Irrigation Products to be Furnished
1. Supply as a part of this Contract the following tools:
a. Two (2) key sets for locking irrigation controller.
b. Two (2) valves of each size and type used.
c. Two (2) decoders of each type used.
d. Five (5) rotors of each type used.
e. Five (5) pop up sprinklers of each type used.
f. Five (5) complete nozzle sets of each type used.
g. Five (5) bubblers of each type used.
h. One Hundred (100) feet of drip tubing for each type used. i. Ten (10) drip emitters for each type used.
j. Two (2) sets of special tools required for removing, disassembling and adjusting each type of sprinkler used
k. Two (2) sets of special tools required for removing, disassembling and adjusting each type of joint restraint used.
l. Two (2) lock and key sets for controller enclosures (keyed as per District specifications)
m. Two (2) quick coupler keys and matching hose swivels n. Two (2) 60” isolation valve opening keys
o. Four (4) Security keys for concrete valve boxes
p. Two (2) hand-held remote-control transmitters and cases q. Two (2) hand-held decoder programmers
2. The above-mentioned equipment shall be turned over to the District at the conclusion of the project. Written evidence that the District has received materials must be provided to the Landscape Architect prior to scheduling final observation.
1.07 PRODUCT DELIVERY, STORAGE AND HANDLING
Handling of PVC Pipe and Fittings: The Contractor is cautioned to exercise care in handling, loading, unloading, and storing of PVC pipe and fittings. All PVC pipe shall be transported in a vehicle that allows the length of pipe to lie flat so as not to subject it to undue bending or concentrated external load at any point. Any section of pipe that has been dented or damaged will be discarded and if installed replaced with new.
1.08 GUARANTEE
1. The guarantee for the irrigation system shall be made in accordance with the form shown on the following page. A copy of the guarantee form shall be included in the operations and maintenance manual. The guarantee form shall be re-typed onto the Contractor's letterhead and contain the following information:
236
Westacre Park Expansion and Renovation Project Section 02811 September 2024 Irrigation
02811 - 7
GUARANTEE FOR IRRIGATION SYSTEM
We hereby guarantee that the irrigation system we have furnished and installed is free from defects in materials and workmanship, and the work has been completed in accordance with the Drawings and Specifications, ordinary wear and tear and unusual abuse or neglect excepted. We agree to repair or replace any defects in material or workmanship, which may develop during the period of one (1) year from date of final acceptance and to repair or replace with originally specified materials. Any damage resulting from the repairing or replacing of such defects shall be replaced and repaired by the contractor at no additional cost to the District. We shall make such repairs or replacements within a 48-hour period, after receipt of written notice. In the event of our failure to make such repairs or replacements within said period after receipt of written notice from the District, we authorize the District to proceed to have said repairs or replacements made at our expense and we will pay the costs and charges therefore upon demand.
PROJECT:__________________________________________________________ LOCATION:_________________________________________________________ SIGNED:____________________________________________________________ ADDRESS:__________________________________________________________ PHONE:____________________________________________________________ DATE OF ACCEPTANCE:______________________________________________ 237
Westacre Park Expansion and Renovation Project Section 02811 September 2024 Irrigation
02811 - 8
PART 2 - PRODUCTS
2.01 MATERIALS
A. Trench Backfill
1. Native Material
a. Native backfill material, if approved by the District, shall be used for backfill material.
b. Native Backfill: Prepared as necessary to be non-expansive, free of debris, organic material and lumps larger than three (3) inches, rocks larger than two (2) inches,
c. Unless otherwise specified in the Special Provisions, the Contractor has the option to use imported granular material for trench backfill in place of native material excavated at the work site.
1.) The optional use of imported granular material for trench backfill will be at the Contractor’s expense.
2. Imported Soil
a. Imported Backfill: Non-expansive soil, free of debris, organic material and lumps larger than three (3) inches, rocks larger than two (2) inches, with a liquid limit no greater than 40 and a plasticity index no greater than 15.
3. Graded Sand
a. Graded sand backfill must be free from vegetable matter, lumps, balls of clay, or adherent films of clay, and must have a minimum Cleanliness Value of 60 as determined by California Test 227.
b. The percentage composition by weight of graded sand must conform to the following gradations:
Sieve Size Percentage Passing by Weight
9.5 mm (3/8”) 100
4.75 mm (#4) 92-100
2.36 mm (#8) 90-100
1.18 mm (#16 80-100
600 µm (#30) 65-100
300 µm (#50) 40-80
150 µm (#100) 0-40
75 µm (#200) 0-12
4. Crushed Rock or Gravel
238
Westacre Park Expansion and Renovation Project Section 02811 September 2024 Irrigation
02811 - 9
a. Crushed rock or gravel backfill material shall be graduated so that 100 percent will pass the 3/4 inch sieve and not more than 15 percent will pass the number 8 sieve.
b. Clean crushed rock must have a minimum Cleanliness Value of 60 as determined by California Test 227. At least 75 percent of the crushed rock particles must have 2 or more fractured faces.
B. Woven Geotextile Fabric
1. The woven geotextile fabric must be a high modulus woven fabric consisting of long chain polymeric monofilaments, slit film tapes, or multifilaments of tape and nonwoven yarn of polypropylene, polyester or nylon, and must be inert to commonly encountered chemicals, rotproof and resistant to ultraviolet light exposures, insects, and rodents.
2. The fabric must be woven into a stable network and the edges of the fabric must be selvedged or surged in such a way that fabric will not unravel or fray during installation or usage.
3. The geotextile must conform to the physical property requirements as below:
a. Grab tensile strength (any direction), lb. ASTM D 4632 200 lbs. b. Weight, oz/yd3 ASTM D 5261 6.0 oz/yd3
c. Permittivity, sec-1 ASTM D 4491 0.5 sec-1
d. Mullen Burst strength, psi ASTM D 3786 400 psi
e. The fabric must have an Equivalent Opening Size no larger than U.S.
Standard Sieve Number 50 as determined by U.S. Corps of Landscape Architects Specification CW-02215.
C. Irrigation Pipe Sleeve
1. Irrigation Sleeve 4” and smaller shall be PVC Schedule 40 with solvent-weld joints.
a. Pipe shall be made from NSF approved Type I, Grade I, PVC compound conforming to ASTM resin specification D1785. All pipes shall meet requirements set forth in Federal Specification PS-21-70. (Solvent-weld Pipe)
2. Irrigation Sleeve 6” and larger shall be corrugated HDPE with smooth interior wall.
a. HDPE shall be made from high-density polyethylene with an integrally formed smooth interior conforming to AASHTO M252, AASHTO M294, Type S.
D. PVC Pipe and Fittings
239
Westacre Park Expansion and Renovation Project Section 02811 September 2024 Irrigation
02811 - 10
1. Main Line Pressure Pipe and Fittings.
a. Pressure main line piping four (4) inch and larger shall be PVC Class 200, rubber ring joint type.
1.) Couplings with grooves for sealing rings either shall be a separate machined part with two (2) sealing rings or manufactured as an integral part at one end of each pipe length. Pipe shall be made from an NSF (National Sanitation Foundation) approved Type I, Grade I, PVC compound conforming to ASTM resin specification D2241. All pipes shall meet requirements as set forth in Federal Specification PS22-70, with an appropriate standard dimension ratio (S.D.R. Pipe).
2.) Lubricant for assembling gasketed pipe and fittings shall be as per manufacturer’s specifications.
3.) Main line fittings and valves two and one half (2-1/2) inch and larger shall be mechanically restrained using integral joint restraints or approved equal.
b. Pressure main line piping three (3) inch to two and one half (2-1/2) inch shall be PVC Class 315 and two (2) inch and smaller shall be PVC Schedule 40.
1.) Main line fittings three (3) inch and smaller shall be PVC Schedule 80 c. All PVC pipe shall be marked continuously and permanently with the following information: Manufacturer's name, nominal pipe size, schedule or class of pipe, pressure rating in P.S.I. extrusion, NSF approval and date of extrusion.
d. All PVC fittings shall bear the manufacturer's name or trademark, material designation, size, applicable I.P.S. schedule and NSF seal of approval.
2. Lateral Non-Pressure Pipe and Fittings
a. PVC pipe 2-1/2 inch and larger shall be PVC Class 315. b. PVC pipe 2 inch and smaller shall be PVC Schedule 40. c. Pipe shall be made from NSF approved Type 1, Grade PVC compound conforming to ASTM resin specification 1785. All pipes shall meet requirements as set forth in Federal Specification PS-21-70. (Solvent-weld pipe).
d. Lateral pipe fittings downstream of remote control valves shall be solvent welded PVC Schedule 40 unless otherwise noted in details and drawings.
E. Main Line Joint Restraints
240
Westacre Park Expansion and Renovation Project Section 02811 September 2024 Irrigation
02811 - 11
1. All gate valves, ductile iron bends, reducers, tees and pipe bell and gasket joints adjacent to restrained joints shall be mechanically restrained in accordance to the manufactures recommended design criteria and guide. Concrete thrust blocks are not to be used.
2. The mechanical joint restraint shall be capable of securing the PVC pipe directly to the gate valve, ductile iron bends, reducers and tees without the use of bolts, links and adapters.
3. Joint restraints shall be manufactured from ductile iron, grade 65-45-12 in accordance with ASTM A-536.
4. Bolts and nuts used on joint restraints shall be provided as part of the restraint assembly.
5. All joint restraints shall be installed using methods recommended by the manufacturer. All bolts and nuts shall be tightened as per manufacturer’s recommended torque ratings.
F. Main Line Detectable Marking Tape
1. Detectable marking tape shall consist of a 5.0 mil (0.005”) thickness, five-ply composition, ultra-high molecular weight, 100 percent virgin polyethylene and acid, alkaline and corrosion resistant.
2. The tape tensile strength is in accordance with ASTM D882-80A and will not be less than 7800 PSI. The tape will have a 2.0 mil (0.0020") solid aluminum foil core, encapsulated within 2.55 mil (0.00255") polyethylene backing.
3. Tape width shall be three (3) inch minimum width or as specified by manufacturer for pipe size.
4. Detectable marking tape for irrigation water shall be blue in color with “Caution:
Irrigation Water Line Buried Below”
G. Concrete
1. ASTM Class B concrete shall be used for fill concrete.
2. Concrete shall have a 3,500-PSI compressive strength at 28 days and shall have maximum water to cement and dispersing agent ration of 56%. Concrete shall have a minimum cement content of 470 lbs. (5 bags) per cubic yard concrete.
Nominal maximum size of coarse aggregate shall be three-quarter (3/4) inch.
H. PVC Threaded Nipples:
1. PVC Schedule 80 nipples shall be produced from extruded stock grade PVC compounds.
a. No molded nipples shall be used.
241
Westacre Park Expansion and Renovation Project Section 02811 September 2024 Irrigation
02811 - 12
b. PVC Schedule 80 nipples shall be made from NSF approved PVC compound conforming to ASTM D1784, Cell Classification 12454
I. Manual Valves
1. All mainline valves shall be resilient wedge and conform to AWWA C153 standards.
a. Material shall be ductile iron per ASTM A-536, Grade 65-45-12. b. Epoxy coating on all interior and exterior surfaces shall be fusion bonded epoxy, 12-14 mil thickness.
c. Gate valves shall be available in spigot x bell and bell x bell models to mechanically connect to fittings or plastic pipe. Valve bell end shall be deep bell, gasket and equipped with cast joint restraint clamps to securely fasten to plastic pipe.
d. Restraints shall have blunt cast serrations. Machined threaded restraints will not be allowed.
e. Valves shall have a shroud around the 2” operating nut to accept IPS PVC sleeve which provides dirt-free access to actuate the valve.
2. Valves two (2) inch and smaller shall be bronze, full port ball valve with threaded ends.
a. Ball valves shall be equipped with a cast bronze cross or tee handle.
J. Quick Coupling Valves
1. Quick coupling valves shall have a brass two-piece body designed for working pressure of 150 P.S.I. operable with quick coupler key. Key size and type shall be as shown on the Drawings.
K. Remote Control Valve
1. Remote control valves shall be of the same type, manufacturer and model shown on drawings.
2. Remote control valves shall be operated by a 2-wire decoder with a separate decoder address for each valve station and be of the same type, manufacturer and model as shown on the drawing.
3. Remote control valves shall be labeled with a valve identification tags of the same type, manufacture and model shown on drawings.
L. Valve Identification
242
Westacre Park Expansion and Renovation Project Section 02811 September 2024 Irrigation
02811 - 13
1. Remote control valve tags shall be of the same type, manufacturer and model shown on drawings.
2. Remote control valve tags shall be manufactured from polyurethane Behr Desopan, with a reinforced attachment hole and will be 2-1/4” x 2.3/4” in size. a. Remote control valve identification tags shall be yellow in color with double sided stamped controller and valve designation.
b. Manual and remote-control valve identification tags shall be blue in color with double sided stamped “Non-Potable Water” on both sides.
B. Wiring
1. Two-wire cable shall be a twisted, solid-core wire suitable for direct burial, colorcoded red and blue.
2. All connections in the two-wire path shall be made with 3M DBRY-6 waterproof connectors or approved equal.
3. Two-wire cable earth grounding shall be per manufacture’s specifications.
C. Irrigation Controller
1. The irrigation controller shall be of the same type, manufacture and size as shown on the drawing.
2. The irrigation controller shall operate the remote-control valves using a two-wire path.
3. The irrigation controller shall have a minimum of six (6) sensor outputs.
4. The irrigation controller shall be equipped with two (2) hand held remote programmers that use wireless induction to program and communicate with decoders in the field.
5. Irrigation Controller shall have a five (5) year manufacturer’s warranty.
D. Master Valve and Valve Flow Sensor Assembly
1. The master valve and flow sensor assembly shall be of the same type, manufacture and size as shown on the drawing.
2. The master valve shall be operated by a 2-wire decoder.
3. The Flow Sensor shall be connected to the controller through a 2-wire path sensor decoder as per manufacture specification.
E. Earth Ground
243
Westacre Park Expansion and Renovation Project Section 02811 September 2024 Irrigation
02811 - 14
1. Earth Grounding for electronic irrigation controller shall be made in accordance with Article 250 of the National Electrical Code (NEC) and manufacturer written specifications. At the very minimum, the grounding circuit shall include a copper clad steel ground rod, a solid copper ground plate and one hundred (100) pound of PowerSet earth contact material or approved equal.
2. Ground Rods shall be 5/8” diameter by 10’ length copper clad with a surface area of 238 square inches.
3. Copper Ground Plates shall be 12” by 36” by 1/16” solid copper with a surface area of 870 square inches.
a. Copper Ground Plates shall come with 25 feet of 6AWG copper wire welded to the plate.
b. Copper Ground Plates shall conform to N.E.C. requirements.
4. Bare Copper Wire shall be soft-annealed, uncoated copper, 6AWG and conforming to UL standard 719.
a. Bare Copper Wire shall be permanently welded to ground rods and ground plates, so the connection doesn’t loosen or corrode.
b. Exothermic reaction welding process shall be used and shall conform to N.E.C. requirements.
5. Earth Contact Backfills shall be superior conductive material, non-hardening or hardening such as PowerFill or PowerSet or approved equal.
F. Irrigation Heads
1. All irrigation heads shall be of the same size, type and deliver the same rate of precipitation with the diameter (or radius) of throw, pressure, and discharge as shown on the plans and/or specified herein or approved by the District.
2. Rotor heads shall be gear drive with stainless steel riser and factory installed check valve.
3. Pop Up Sprinkler bodies shall be equipped with pressure regulation, heavy-duty spring and factory installed check valve.
a. Pop Up Sprinklers shall come equipped with rotary nozzles and matched precipitation.
4. All irrigation heads of similar functions shall be of common manufacture and shall be marked with the manufacturer’s name and model identification in a position where they may be identified without being removed from the system.
G. Valve and Electric Boxes
244
Westacre Park Expansion and Renovation Project Section 02811 September 2024 Irrigation
02811 - 15
1. Valve boxes installed in decomposed granite areas shall be tan colored; valve boxes installed in planter areas shall be green colored.
2. Valve boxes shall be per plans and details with bolt down kit and a skid resistant marked surface.
3. Valve box lids shall be per plans with diamond plated surface texture with a locked and secure improved wing design securely locking the cover in place from inside the enclosure.
a. Valve box lids shall come equipped with a vandal resistant security bolt and a specialized key to open.
b. Valve box lids shall have a welded identification plate attached by the manufacturer to say irrigation.
PART 3 - EXECUTION
3.01 GENERAL
A. Appoint a competent resident superintendent to be onsite whenever the WORK is in progress. The superintendent shall not be replaced without notice to the Landscape Architect.
B. Contractor is responsible for locating and avoiding underground utilities, for notifying all appropriate agencies prior to beginning excavation, and for any damage caused by Contractor. Contractor is required to notify Landscape Architect and the utility company should there be any damage to utilities.
3.02 SITE CONDITIONS
1. Contractor shall protect all existing site development including, but not limited to, existing buildings, equipment, underground utilities, walls, materials, etc. Any existing site development damaged by willful or negligent acts of Contractor or any of Contractor’s employees shall be replaced or repaired at no expense to District and in a manner satisfactory to Landscape Architect before Project acceptance is given. This provision applies to onsite damage as well as to that which may occur to adjacent properties
2. All scaled dimensions are approximate. The Contractor shall check and verify all site dimensions and notify the District if site conditions have changed from those specified in the drawings.
3. The Contractor shall check and verify all site water and electrical services and notify the District if site conditions have changed from those specified in the drawings.
4. The Contractor shall carefully check all grades to satisfy him that he may safely proceed before starting work on the irrigation system.
245
Westacre Park Expansion and Renovation Project Section 02811 September 2024 Irrigation
02811 - 16
5. The contractor shall obtain permits and call for inspections as required by local codes and regulation. All installations shall conform to local codes and accepted construction practices.
3.03 PREPARATION
A. Physical Layout
1. Locations on Drawings are diagrammatic and approximate only and shall be changed and adjusted as necessary and as directed by the District to meet existing conditions and obtain complete water coverage.
2. Prior to installation, the Contractor shall stake out points of connection, power connections to controllers, location of mainlines, valve groupings and obtain review by the District before installation. The District prior to installation shall approve all layouts in writing. If equipment is incorrectly located without said approval, it is the Contractor's responsibility to relocate it as per the District’s directions without additional cost.
3. Prior to installation in Turf Fields, the Contractor shall stake out points of connection to main line, location of mainlines, valves groupings and sprinkler heads that define the layouts of the Turf Fields and obtain review by the District before installation.
4. The Contractor shall install and extend the system as shown on the Drawings, and as necessary to carry out the intent of the Drawings and Specifications.
3.03 WATER, ELECTRICAL AND TELEPHONE SERVICES
A. Water Supply
1. Coordinate with the District the irrigation water supply point of connection as indicated on the Drawings. Field verify connection location and size. The contractor is responsible for any changes caused by actual site conditions. Notify the District of any discrepancies prior to beginning construction.
B. Electrical Supply
1. Contractor shall provide all materials and connections to supply electrical power to the irrigation controller(s) and other electrical components as needed.
2. Connection shall be made at approximate location(s) as indicated on the Drawings. The Contractor is responsible for minor changes caused by actual site conditions and for the coordination of all electrical service connections to the controllers.
3. A licensed Electrical Contractor shall perform electrical work. Materials and workmanship for electrical service shall conform to the latest edition of the National Electric Code and local codes, ordinances and governing authorities having jurisdiction.
246
Westacre Park Expansion and Renovation Project Section 02811 September 2024 Irrigation
02811 - 17
3.04 INSTALLATION
A. Trenching
1. Dig trenches straight and support pipe continuously on bottom of trench. Lay pipe to an even grade. Trenching excavation shall follow layout indicated on the Drawings and as noted.
2. Provide for twenty-four (24) inches cover for all pressure lines. Contractor shall be responsible to review Grading Plan to control depth of mainline.
3. Provide eighteen (18) inches cover for rotor and sprinklers on non-pressure lines.
4. Provide for a minimum of twelve (12) inches cover for drip manifolds on nonpressure lines.
5. Provide for twenty-four (24) inches cover for all control wiring.
6. Provide twenty-four (24) inches of cover for all pressure lines, non-pressure lines and control wiring under auto traffic areas.
7. Trench width shall be as needed to provide minimum horizontal clearance between pipes and minimum of four (4) inches of clearance between edge of pipes and edges of trench.
8. No pipe shall be laid directly over another pipe.
B. Laying and Jointing Geotextile
1. Placed geotextile directly on prepared subgrade in the trench to conform loosely to the shape of the trench. The geotextile shall be laid flat, but not stretched on the soil, avoid folds and creases.
2. Overlap geotextile side-to-side minimum one and one half (1-1/2) feet. Apart from the one longitudinal overlap no longitudinal joints shall be permitted. a. Curves may be accomplished by folding or cutting the fabric to conform to the curve.
b. Staple overlap at four (4() foot longitudinal intervals using six (6) inch galvanized U-shaped landscape pins.
3. Successive sheets shall be overlapped to form transverse field splices. The splices shall have a minimum overlap of 500 mm and shall be anchored with securing pins to ensure this required overlap is maintained. Alternatively, sewn joints will be accepted subject to the approval of the Landscape Architect.
4. Where outlet pipe passes through the geotextile, a separate piece of geotextile of sufficient size shall be wrapped around the pipe and flared against the side of the geotextile wrapped pipe.
247
Westacre Park Expansion and Renovation Project Section 02811 September 2024 Irrigation
02811 - 18
C. Backfilling
1. Excavate bottom of trench to uniform grade to achieve stable trench conditions and satisfactory compaction of foundation or bedding materials. Pipes must have firm, uniform bearing for the entire length of each pipe line. Wedging or blocking of pipe will not be permitted
2. Place Geotextile to prevent particle migration from the in-situ into open graded embedment materials.
3. Place sand backfill six (6) inches in depth below the pipe and compact to 85 percent of the maximum dry density determined according to ASTM D 698.
4. Manually spread sand backfill around the pipe to provide uniform bearing and side support when compacted. Perform placement and compaction directly against the undisturbed soils in the trench sidewalls.
5. Place sand backfill six (6) inches in depth above the pipe and compact by at least two passes manual tamping to 85% relative compaction. Ponding or jetting methods will not be permitted.
6. Backfill lateral lines with approved backfill material. Backfill material shall be free from organic materials, large clods of earth or rocks larger than three (3) inches in diameter, trash, debris, rubbish, broken cement, asphalt material or other objectionable substances.
7. If settlement occurs and subsequent adjustments in pipe, valves, sprinklers heads, lawn or planting, or other construction are necessary, the Contractor will make all the required adjustments at Contractor’s expense.
D. Trenching and Backfilling Under Paving
1. Trenches located under areas where paving, asphaltic concrete or concrete shall be installed, shall be backfilled with sand, a layer six (6) inches below the pipe and six (6) inches above the pipe and compacted in layers to 85% compaction, using manual or mechanical tamping devices. All trenches shall be left flush with the adjoining grade. The Contractor shall set in place; cap and pressure test all piping under paving prior to the paving work.
2. Generally piping under existing walks is done by jacking, boring or hydraulic driving, but where any cutting or breaking of sidewalks and/or concrete is necessary, it shall be done and replaced by the Contractor as part of the Contract cost. Permission to cut or break sidewalks and/or concrete shall be obtained from the District in writing. No hydraulic driving shall be permitted under concrete paving.
E. Sleeving
248
Westacre Park Expansion and Renovation Project Section 02811 September 2024 Irrigation
02811 - 19
1. Sleeving shall be installed for irrigation pressure main line pipe, non-pressure lateral pipe and electrical wiring that crosses pavement, walkways, paths, mow curbs, concrete, and other hardscape elements as needed whether shown on drawing or not.
2. Install irrigation and electrical sleeving as needed whether indicated on the Drawings. Contractor shall coordinate the installation of sleeving with the work of other trades. Sleeving shall extend a minimum of six (6) inches past hardscape.
3. Sleeves shall be sized to easily accommodate piping and/or control wiring as called for in the drawings leaving a minimum of 25% void space inside sleeve. a. The contractor shall be responsible to verify sleeving sizes based on field verification of pipe and wire crossings.
4. Separate sleeves shall be provided for:
a. Main line and lateral piping.
b. 120V electric service
c. Irrigation 2-wire decoder cable
d. Irrigation ground wire.
5. Sleeves shall have both ends capped during installation to prevent dirt and debris from entering the sleeve.
6. Identify location of sleeve ends from two permanent points of reference and mark on record drawings.
7. When utilizing existing sleeving, the contractor will remove existing pipe and wire and remove debris from sleeve prior to installing new irrigation components.
F. PVC Pipe
1. Routing of irrigation pipe as indicated on the Drawings is diagrammatic. Install lines, stub outs and valve manifolds to conform to the details shown on the drawings.
2. Install irrigation main line a minimum of five (5) feet from tree locations to avoid conflict with mature rooting systems.
3. Install no multiple assemblies on plastic lines. Provide each assembly with its own outlet.
4. Changes in directions and depth on irrigation main line shall be made with 45° bends. No 90° bends shall be used.
5. Install all assemblies specified herein in accordance with respective detail. In absence of detail Drawings or specifications pertaining to specific items required to complete work, provide shop drawing in accordance with best standard practice to Landscape Architect for review and approval prior to installation. 249
Westacre Park Expansion and Renovation Project Section 02811 September 2024 Irrigation
02811 - 20
6. PVC pipe and fittings shall be thoroughly cleaned of dirt, dust and moisture before installation. Installation shall be as recommended by the pipe and fitting manufacturer.
7. PVC pipe shall be installed so that there will be a small amount of excess length in the pipe to compensate for contraction and expansion of the pipe. This shall be accomplished by "snaking" the pipe in the trench during installation.
8. Center load pipe with small amounts of backfill to prevent arching and slopping under pressure. Leave joints exposed for inspection during testing.
9. No water shall be permitted in the pipe until inspections have been completed and a period of at least 24 hours has elapsed for solvent weld setting and curing.
10. Plastic to metal connections shall be made with plastic male adapters and female metal adapter, hand tightened, plus one turn with a strap wrench. Teflon tape or approved equal shall be used on all threaded PVC to metal joints.
11. Gasket Joint: Use gasket lube as recommended by pipe manufacturer.
12. Solvent Weld Joint: The Contractor must make solvent weld joints with nonsynthetic bristle brush in the following sequence:
a. Apply a liberal, even coat of purple PVC primer to the pipe and fitting immediately before applying the solvent.
b. Apply a liberal even coat of solvent to the inside of the fitting and then to the outside of the pipe, making sure that the coated area is equal to the depth of the fitting socket. Section 20 - Landscaping 20.15 1/1/16 3. c. Insert the pipe quickly into the fitting and turn the pipe approximately onequarter (1/4) turn to distribute the solvent and remove air bubbles. Hold the joint for approximately fifteen (15) seconds so the fitting does not push off the pipe.
d. Use a clean rag and wipe off all excess solvent.
e. To prevent disturbing the last completed joint, the pipe must not be twisted when making subsequent joints.
f. Allow at least fifteen (15) minutes setup time for each welded joint before moving.
13. Threaded joints shall be wrapped with Teflon tape as per manufacturer’s instructions.
14. Flush all debris out of pipe prior to installing valves and heads. 250
Westacre Park Expansion and Renovation Project Section 02811 September 2024 Irrigation
02811 - 21
15. Install detectable marking tape 12” above main line pipe along the entire length of the main line run, including main line branches and irrigation crossover sleeves.
16. When utilizing existing main line, make connections to new main line using longbarrel self-restraint repair couplers.
G. Line Clearance
1. Irrigation lines shall have a minimum horizontal and vertical clearance of four (4) inches from each other. Parallel lines shall not be installed directly over one another.
2. Horizontal and vertical clearance of irrigation lines from lines from other trades shall be as per local codes and regulations.
3. Line clearances shall be inspected and approved by the District prior to backfilling trenches.
H. Joint Restraint System
1. Install Joint Restraint System as per details and manufacturer’s specifications.
I. Gate Valves
1. Install as gate valves as per details and manufacturer's specifications.
2. Install where shown on Drawings. Locate, in valve boxes, twelve (12) inches from walk, curb, header board, etc., for easy access unless otherwise noted on drawings.
3. Install one gate valve per valve box. Provide extension units as required as per details. Install valve boxes in shrub planting areas whenever possible.
4. Install a T. Christy I.D. water quality tag on all gate valves. Attach the identification tags to the valve stem using a nylon cable tie.
5. It is the intent of the irrigation design to minimize valve boxes within the turf field area. When valve boxes are required to be installed in the soccer field, the contractor shall submit proposed locations to Landscape Architect to review and approve prior to installation
J. Quick Coupler Valve
1. Install as quick coupler valve as per details and manufacturer's specifications.
2. Install where shown on Drawings. Locate, in valve boxes, twelve (12) inches from walk, curb, header board, etc., for easy access unless otherwise noted on drawings.
251
Westacre Park Expansion and Renovation Project Section 02811 September 2024 Irrigation
02811 - 22
3. Install one quick coupler valve per valve box. Provide extension units as required as per details. Install valve boxes in shrub planting areas whenever possible.
4. Install a T. Christy I.D. water quality tag on all gate valves. Attach the identification tags to the valve stem using a nylon cable tie.
5. It is the intent of the irrigation design to minimize valve boxes within the turf field area. When valve boxes are required to be installed in the turf field, the contractor shall submit proposed locations to Landscape Architect to review and approve prior to installation
K. Electric Remote-Control Valves
1. Install with 2-wire decoder and pressure regulator as per details and manufacturer's specifications.
2. Install where shown on Drawings. Locate valve boxes twelve (12) inches from, and perpendicular to walk, curb, header board, etc., for easy access.
3. Install one (1) remote control valve per valve box as per detail. Provide extension units as required so as valve is protected by adjacent native soil.
4. Install valve boxes in shrub planting areas wherever possible.
5. Provide twenty-four (24) inch expansion loop at all electrical connections wrapped neatly along interior wall of valve boxes.
6. Install a T. Christy I.D. tags on all valves identifying the controller and station number of the valve and water quality. Attach the identification tags to the valve stem using a nylon cable tie.
7. It is the intent of the irrigation design to minimize valve boxes within the turf field area. When valve boxes are required to be installed in the turf field, the contractor shall submit proposed locations to Landscape Architect to review and approve prior to installation
L. Master Valve and Flow Sensor
1. Install shall be in accordance with the corresponding detail in the Standard Drawings.
a. Install with a minimum upstream and downstream length of straight pipe per manufacturer’s specifications
2. Install with 2-wire decoder and sensor decoder per details and manufacturer’s specifications.
3. Install a T. Christy I.D. tags on all valves identifying the controller and station number of the valve and water quality. Attach the identification tags to the valve stem using a nylon cable tie.
252
Westacre Park Expansion and Renovation Project Section 02811 September 2024 Irrigation
02811 - 23
4. Contractor shall be responsible to calibrate flow sensor per manufacturer’s specifications.
a. Run flow test on each completed irrigation remote control valve to identify actual field flow using the controller learned flow system capabilities.
Contractor shall work with manufacturer’s representative as needed to perform accurate flow test.
b. Contractor shall use field flow test results to schedule flow zones on controller system as part of schedule programing.
M. Automatic Controller
1. Install as per manufacturer's specifications, drawings and details.
2. Controller shall be securely mounted in the location as indicated on the Drawings or approved by the District in such a manner that all normal operations can be conveniently made by the operator.
3. The Contractor shall properly ground the controllers per contract documents and in accordance with N.E.C and local codes and as per manufacturer’s specifications.
4. The Contractor shall take all decoder cables to the controller and make all required connections for their installation.
5. Contractor shall be responsible to program controller per contract documents. Run flow test for each control valve and use to program flow zones. Schedule remote control valves to maximize system pump efficiency and minimize system run times.
a. The irrigation schedule provided per contract documents shall be used as a guide only. It is the Contractor’s responsibility to adjust controller watering schedules based on actual site conditions including but not limited to plant species, soil conditions, slope, weather, irrigation application method, etc. b. At no time shall the contractor allow the pooling or runoff of water on the site due to length of irrigation cycle. Adjust run and soak times as needed to avoid pooling of water and runoff.
N. 2-Wire Decoder Cable
1. Install 2-wire decoder cable in conduit. Route along supply line piping wherever practical.
2. No cable splices shall be allowed between controller and valves and between valve to valve that are less than 500 feet apart.
253
Westacre Park Expansion and Renovation Project Section 02811 September 2024 Irrigation
02811 - 24
3. Use one waterproof splice pack per splice. Indicate all splices on the “As-built” plan. Cable splice connections shall be per manufacture specifications.
4. Where control wires pass under paving, they shall pass through a Schedule 40 PVC sleeve.
5. Ground decoder 2-wire cable per manufacturer’s specifications.
6. Install twenty-four (24) inch service loop neatly coiled inside the perimeter of the valve box to allow for valve, decoders and splices to be pulled to surface for servicing. Coil service loop neatly along inside wall of valve box.
O. Conduit
1. PVC Schedule 40 conduit with 2-wire decoder cable shall be installed as shown on plans and adjacent to irrigation mainline wherever possible.
2. The ends of the conduits, whether shop or field cut, shall be reamed to removed burrs and rough edges. Cuts shall be made square and true.
3. Install conduit couplers onto pipe ends when in direct contact with 2-wire decoder cable.
4. The ends of the conduit shall be capped until the pulling of wiring is started.
Conduit shall be free of soil and debris.
5. Conduit bends, except factory bends, shall have a radius of not less than six times the inside diameter of the conduit.
6. Install a one-quarter (1/4) inch polypropylene pull tape in conduit. Loop pull tape into each valve box and splice box.
7. When utilizing existing conduit, the contractor will remove existing control wire, vacuum debris from conduit prior to installing new 2-wire cable through existing conduit. Install electric boxes as shown and as needed to facilitate installing new 2-wire cable in existing conduit.
P. Controller Earth Ground
1. Install earth grounding in accordance to Article 250 of the National Electrical Code and as per manufacturer’s specifications.
2. Ground rods shall be driven a minimum of ten (10) feet into the ground in a vertical or oblique position. The angle of the rod relative to the vertical shall be no more than 45-degree angle.
3. Ground plates shall be installed in a horizontal position a minimum of 30” below ground level.
254
Westacre Park Expansion and Renovation Project Section 02811 September 2024 Irrigation
02811 - 25
4. Grounding conductors shall be installed to avoid sharp bends. When bends are required to pass through buildings and equipment, they must have a minimum angle of 90º and a minimum radius of 8”, which equates to a standard 1-1/2” PVC sweep conduit elbow.
5. Ground rods shall be installed in soils with minimum moisture content of 15% within the sphere of influence. Use supplemental irrigation as needed to meet this requirement.
6. Use “Earth Contact Materials” as needed and as per manufacturer’s specifications to obtain desired soil resistivity.
7. Use permanent welded connections to connect grounding conductors to ground rods. Solder shall not be used for this connection.
8. The grounding grid shall be field tested to verify that resistance readings are no more than 10 ohms.
Q. 2-Wire Decoder Earth Ground
1. Install 2-wire decoder system earth grounding in accordance manufacturer’s specifications.
R. Valve Boxes
1. Valve boxes installed in decomposed granite areas shall be tan colored; valve boxes installed in planter areas shall be green colored.
2. Install valve boxes in shrub planter areas wherever possible.
3. Install valve boxes in groupings as shown to facilitate long-term maintenance.
Contractor to stake out dimensions of each valve box bank location for review and approval by Landscape Architect prior to installation.
4. Install valve boxes as per details unless otherwise noted on plans.
5. It is the intent of the irrigation design to minimize valve boxes within the soccer field area. When valve boxes are required to be installed in the soccer field, the contractor shall submit proposed locations to Landscape Architect to review and approve prior to installation
S. Electric Pull Boxes
1. Pull boxes must be installed at the following locations:
a. At all 2wire decoder cable splices, except splices made in valve boxes. b. At every 5th bend or at intervals not to exceed one hundred and fifty (150) feet (150’) along any 2wire decoder cable path, whichever comes first. 255
Westacre Park Expansion and Renovation Project Section 02811 September 2024 Irrigation
02811 - 26
c. Within five feet (5’) of irrigation controllers or within five feet (5’) of cabinets housing one (1) or more controllers.
d. At conduit stub outs.
e. At the ends of conduit crossover sleeves. Include eighteen-inch (18”) of 2wire decoder cable loop along inside of pull box.
f. At other locations shown on the Plans.
g. The tops of all pull boxes must be flush with the surrounding finished grade. h. When utilizing existing conduit to install new 2-wire decoder cable, Contractor shall be responsible to install electric pull boxes as needed to facilitate installation.
i. It is the intent of the irrigation design to minimize electric boxes within the turf field area. When electric boxes are required to be installed in the turf field, the contractor shall submit proposed locations to Landscape Architect to review and approve prior to installation.
2. When approved by the District, the Contractor may install additional pull boxes to facilitate the work. Additional pull boxes installed for the contractor’s convenience will be at the Contractor’s expense.
T. Irrigation Heads
1. Install irrigation heads as detailed on the Drawings. Irrigation heads to be installed in this work shall be as per approved submittals.
2. Irrigation heads shall be installed plumb and vertical to finish grade unless otherwise noted on plan.
3. Replace all clogged nozzles with new nozzles.
4. Adjust rotor, rotator arcs and radii as needed to prevent overspray onto hardscapes, walkways, buildings, etc.
5. Spacing of heads shall not exceed the maximum indicated on the Drawings. In no case shall the spacing exceed the maximum recommended by the manufacturer.
Adjust radii to obtain head to head coverage as per manufacturer’s specifications
6. Swing joints shall be in accordance with the details and approved submittals.
7. Swing joints for heads shall be the same size as the inlet opening of the sprinkler body.
8. Add additional heads as needed to provide head to head coverage with no additional cost to the District.
256
Westacre Park Expansion and Renovation Project Section 02811 September 2024 Irrigation
02811 - 27
U. Irrigation Head Replacement – Turf Field
1. The contractor shall remove existing irrigation heads, clean and return to District per drawing notes.
2. Cap existing swing joint risers to prevent dirt and debris from entering irrigation system piping.
3. Flag or mark by approved methods location of irrigation head to be replaced.
4. After finished grade is established in soccer fields, install new rotors per contract documents.
5. Flush irrigation lines clear of dirt and debris prior to installing nozzles.
6. Install nozzles and adjust radii and arc as per plan.
7. Contractor shall be responsible to make final head layout adjustments as needed based on actual field conditions at no additional cost to District.
3.05 SYSTEM ADJUSTMENT
A. The Contractor shall flush and adjust all irrigation heads for optimum performance and to prevent over-spray onto walks, windows, roadways, and buildings as much as possible.
B. If it is determined that adjustments in the irrigation equipment shall provide proper and more adequate coverage, the Contractor shall make such adjustments after written approval by the District. Adjustments shall include changes in head locations, nozzle size and degrees of arc as required without additional contract costs.
C. If it is determined that any irrigation equipment is improperly installed, the contractor shall reinstall the equipment to conform to construction documents.
D. All irrigation heads shall be set perpendicular to finished grades unless otherwise designated on the Drawings.
3.06 TESTING OF THE IRRIGATION SYSTEM
The Contractor shall request the presence of the District at least two (2) working days in advance of testing or as noted below.
A. Existing Main Line Pressure Test in Turf Fields - BASELINE
1. Contractor shall perform baseline pressure test on existing main line in soccer field to be retained and protected prior to start of work.
1.) Contractor shall provide a proposed method to perform pressure test based on requirements listed here within to Landscape Architect for approval prior to start of work.
257
Westacre Park Expansion and Renovation Project Section 02811 September 2024 Irrigation
02811 - 28
2.) Contractor shall comply to contract document requirements for Main Line Pressure Test.
B. Main Line Pressure Test
1. Except for non-rigid pipelines and lateral irrigation lines, pressure testing for leakage must be performed on all supply lines installed by the Contractor.
2. Pipelines must be tested in place and all open ends of the pipeline and fittings must be plugged or capped prior to testing.
3. The Contractor must notify the District at least twenty-four (24) hours prior to performing any pressure test. Pressure test must be performed only between the hours of 8:00 a.m. and 5:00 p.m. except that no pressure tests shall be made on Saturdays, Sundays, or legal holidays unless otherwise approved in writing by the District.
4. Test all pressure lines and connections to remote control valves and gate valves under hydrostatic pressure of one hundred and twenty (120) pounds per square inch.
5. Pipelines to be tested must be filled with water, and a pressure gauge must be connected to the pipeline. The pipe must then be placed under a pressure of one hundred twenty (120) pounds per square inch, after which the source of pressure must be cut off, leaving the line under the required pressure.
6. The pressure gauge must be calibrated from zero (0) to two hundred (200) pounds per square inch (psi) in five (5) pound increments and must be accurate within a tolerance of two (2) pounds.
7. The Contractor must provide the necessary pump and equipment required for this test.
8. The pipeline must be tested under the required pressure for a period of two (2) hours. The pressure gauge must remain in place until each test period has been completed.
a. Leaks that develop in the tested portion of the system must be located and repaired after each test period when a drop of more than two (2) pounds is indicated by the pressure gauge when testing pipe over one hundred feet (100’) in length. There must be no pressure drop permitted when testing pipe from one (1) foot to one hundred feet (100’) in length. b. After such leaks have been repaired, the two (2) hour pressure test must be repeated and additional repairs made until pressure test passes.
9. If testing by means of water pressure, air must be expelled from the pipe prior to testing.
258
Westacre Park Expansion and Renovation Project Section 02811 September 2024 Irrigation
02811 - 29
10. Tests on pressure lines must be completed prior to backfilling; however, sufficient backfill must be placed in trenches between fittings to insure the stability of the line under pressure.
a. In all cases, fittings and couplings must be open to visual inspection for the full period of the test. No testing shall be done until the last solvent welded joint has had twenty-four (24) hours to cure.
11. All hydrostatic tests shall be made only in the presence of the District. No pipe shall be backfilled, except for center loading, until it has been observed, tested and approved in writing by the District.
a. Should any work be covered up before such observation and tests are completed, the Contractor shall, at his own expense, uncover the work; and after it has been observed, tested and approved, he then shall make all repairs with such materials as required to restore all work disturbed to original and proper condition.
12. Contractor must disinfect potable water lines according to AWWA standards.
C. Repairs and Coverage
1. All leaks that develop and all defective material in any portion of the irrigation system installed by the Contractor must be repaired or replaced by the Contractor.
2. The entire system must be checked and, if necessary, adjusted for uniform and complete coverage after installing the sprinklers.
3. The risers for sprinklers on slopes must be set approximately perpendicular to the slope. Each series of sprinklers must be installed, and test operated. Nozzles of all sprinklers and bubblers must be adjusted for proper rate of flow and coverage.
Sprinklers and/or bubblers must be relocated as required to produce uniform coverage.
4. A coverage test shall be performed after the irrigation system is completed, an irrigation water audit has been performed and recommended adjustments to the irrigation system have been made.
5. Furnish all materials and perform all work required to correct any inadequacies of coverage due to deviations from the Drawings or where the system has been willfully installed as indicated on the Drawings, when it is obviously inadequate without bringing this to the attention of the District.
6. The sprinkler coverage test shall be completed and approved before landscape material is planted.
3.07 TEMPORARY REPAIRS
A. The District reserves the right to make temporary repairs as necessary to keep the irrigation system in operating condition. The exercise of this right shall not relieve 259
Westacre Park Expansion and Renovation Project Section 02811 September 2024 Irrigation
02811 - 30
the Contractor of his responsibilities under the terms of the guarantee as herein specified.
3.08 IRRIGATION WATER AUDIT
A. The Contractor shall conduct an Irrigation Water Audit using a Certified Irrigation Auditor after the final field observation has been completed and all irrigation components are installed in accordance with the plans and specifications and the irrigation system is accepted by the District.
B. The Irrigation Water Audit shall be conducted in accordance with the latest California Code of Regulations, Title 23, Division 2, Chapter 2.7, Model Water Efficient Landscape Ordinance.
C. Contractor shall incorporate Irrigation Water Audit results while programing Irrigation Controller for specific control zones including but not limited calculations for Zone Flow, Precipitation Rates, Irrigation Efficiency and Distribution Uniformity.
D. The Irrigation Water Audit shall be included in a binder complete with:
1. Cover Sheet with Location, Date, Owner and Certified Irrigation Auditor contact information.
2. Irrigation System Evaluation Checklist
3. Sprinkler Evaluation Data Sheet for each zone
4. Other information as required by latest California Code of Regulations, Title 23, Division 2, Chapter 2.7, Model Water Efficient Landscape Ordinance.
E. Contractor shall be responsible to make recommended adjustments to the irrigation system based on Irrigation Water Audit Report, at no additional cost to owner when adjustments required are due to the Contractors installation inaccuracies of irrigation head placement.
F. Submit Irrigation Water Audit with Close Out Documents.
3.09 MAINTENANCE
Provide maintenance as per SECTION 02970 - LANDSCAPE MAINTENANCE.
3.10 CLEAN-UP
Clean up shall be made as each portion of work progresses. Refuse and excess dirt shall be removed from site. All walks and paving shall be broomed or washed down, and any damage sustained to the work of others shall be repaired to original conditions acceptable to the District.
3.11 OBSERVATION PRIOR TO FINAL ACCEPTANCE
A. The Contractor shall operate each system in its entirety for the District at time of final observation. Any items deemed not acceptable shall be reworked to the complete satisfaction of the District.
260
Westacre Park Expansion and Renovation Project Section 02811 September 2024 Irrigation
02811 - 31
B. The Contractor shall show evidence to the District that the District has received all accessories, charts, Record Drawings and equipment as required before final observation can occur.
3.12 INSPECTION SCHEDULE
A. The Contractor shall be responsible for notifying the Landscape Architect in advance for the following observations according to the time indicated:
1. Staking points of connection, power connections to controllers, location of irrigation main lines, remote control valves– two (2) working days
2. Staking of laterals and irrigation heads - two (2) working days
3. Sprinkler head coverage test and finish grade review prior to planting - two (2) working days
B. No site visits shall commence without all items noted in previous Observation Reports, either completed or remedied, unless such compliance has been waived.
Failure to accomplish punch list tasks or prepare adequately for desired observations shall make the Contractor responsible for reimbursing the Landscape Architect at his current billing rates per hour, plus transportation costs.
C. Normal progress observations shall be requested by the Contractor from the Landscape Architect as per observations listed in specifications SECTION 02905 - LANDSCAPE INSTALLATION.
D. No final observation shall commence without Record Drawings. In the event the Contractor calls for an observation without Record Drawings, without completing previously noted corrections or without preparing the system for observations, he shall be responsible for reimbursing the District at the hourly rate in effect at the time of the observation (plus transportation costs) for the inconvenience. No further observations will be scheduled until this charge has been paid.
3.13 FINAL TEST
A final test of the irrigation system shall be made in the presence of the Landscape Architect at the end of the landscape maintenance period. The system will be accepted only when the entire system performs as set forth on the drawings and specifications and all contract documentation has been received and approved.
A. CLOSE OUT DOCUMENTS
G. Record Drawings; The Contractor must maintain neat and accurate record drawings in conformance with these specifications.
1. Drawings shall be subject to the inspection of the District at all times and must be kept current with all work instructions, change orders, substitutions, and construction adjustments shown thereon and initialed by the inspector. 261
Westacre Park Expansion and Renovation Project Section 02811 September 2024 Irrigation
02811 - 32
2. Immediately following the start of the Plant Establishment Period, the Contractor must submit to the District one (1) full size set of Record Drawings. a. Record drawings will be reviewed by the Landscape Architect and shall be returned to the Contractor with comments for revisions, if necessary. b. Notes and dimensions must be drafted on the record drawings in a neat and legible manner. Drawings must be of sufficient quality to allow further black and white reproduction of the original to be clear.
c. Illegible, inaccurate, or incomplete record drawings will be returned to the Contractor for revisions.
3. The work will not be formally accepted until the Record Drawings are approved by the Landscape Architect. Upon approval by the Landscape Architect, two (2) bond sets of record drawings must be delivered to the District in good and acceptable condition prior to final acceptance of the Work.
H. Controller Charts: The Contractor must provide two (2) sets of 11” x 17” charts for each controller. One copy must be placed on the inside of the controller enclosure door. The second copy must be provided to District maintenance personnel.
1. The base plan for the controller charts must be the approved irrigation Record Drawings.
2. Each controller chart must show the as-built condition of the area controlled by the automatic controller.
3. All symbols must be readable at the final reduced size.
4. The controller chart must include:
a. Connections to existing water lines (point-of-connections). b. Location of backflow preventer(s) and controller(s)
c. Routing of pressure lines and sleeves (show typical station offset and/or dimensions on record drawings)
d. Routing of irrigation conduit and pull boxes
e. Locations of remote control valves, gate valves, and quick coupling valves (show station offset and/or dimensions on record drawings) f. Other items as directed by the District.
5. The chart must be color-coded to easily identify each valve and the respective hydrozone area it irrigates.
262
Westacre Park Expansion and Renovation Project Section 02811 September 2024 Irrigation
02811 - 33
6. When completed and approved, the chart must be hermetically sealed between two (2) pieces of 10 mil plastic, minimum.
7. Each chart must be completed and approved prior to final inspection of the irrigation system.
I. Operation and Maintenance Manual: The Contractor must provide two (2) binders complete with the following information for all irrigation components installed on project:
1. Operating instructions
2. Parts list and breakdown diagram
3. Complete copy of “Approved” irrigation submittals
4. Controller charts and irrigation scheduled for plan establishment and mature water requirements.
5. Irrigation audit report.
6. Acceptance letter that Owner has received “Equipment to be Furnished” and “Training” from contractor as per contract documents.
7. Certificate of Completion
8. Written guarantee and certificate of insurance from the Contractor.
D. Equipment to be Furnished: The Contractor must deliver all tools and equipment called for on the plans and described herein to the District.
1. Two (2) key sets for locking irrigation controller.
2. Two (2) valves of each size and type used.
3. Two (2) decoders of each type used.
4. Five (5) rotors of each type used.
5. Five (5) pop up sprinklers of each type used.
6. Five (5) complete nozzle sets of each type used.
7. Five (5) bubblers of each type used.
8. One Hundred (100) feet of drip tubing for each type used.
9. Ten (10) drip emitters for each type used
263
Westacre Park Expansion and Renovation Project Section 02811 September 2024 Irrigation
02811 - 34
10. Two (2) sets of special tools required for removing, disassembling and adjusting each type of sprinkler used.
11. Two (2) sets of special tools required for removing, disassembling and adjusting each type of joint restraint used.
12. Two (2) lock and key sets for controller enclosures (keyed as per District specifications)
13. Two (2) quick coupler keys and matching hose swivels
14. Two (2) 60” isolation valve opening keys
15. Four (4) security keys for locking valve boxes
16. Two (2) hand-held remote-controls transmitters and cases
17. Two (2) hand-held 2-wire decoder programmers
E. System Walkthrough and Training with District: After the system has been installed and approved and close out documents have been received by the District, the Contractor shall schedule an onsite system walkthrough and training with the District.
The system walkthrough will be no less than 2 hours and shall cover the following:
a. Operation of controller system including programing of features and alert systems.
b. Operation of hand held remote for remote operation of field valves include testing of field valves.
c. Operation of field decoder programmer including programing sample decoder. d. Calibration of flow sensor and running flow test.
e. Maintenance requirements for valves, sprinklers and nozzles.
END OF SECTION
264
Westacre Park Expansion and Renovation Project Section 02905 September 2024 Landscape Installation
02905-1
SECTION 02905
LANDSCAPE INSTALLATION
PART I - GENERAL
1.01 CONDITIONS
A. The general provisions of the Contract, including General and Supplementary Conditions and General Requirements (if any) apply to the work specified in this Section.
1.02 SCOPE OF WORK
A. Furnish all labor, material, equipment and services necessary to provide all landscape work, complete in place, as indicated on Drawings and specified herein.
Work specified in this Section, but is not limited to the following:
1. Soil preparation
2. Decomposed Granite Paving
3. Planting
4. Fertilizer
5. Tree Staking
6. Sodding
7. Clean-up
B. Related Work Specified in Other Sections
1. SECTION 02260 - LANDSCAPE GRADING
2. SECTION 02811 - IRRIGATION SYSTEM
3. SECTION 02970 - LANDSCAPE MAINTENANCE
1.03 QUALITY ASSURANCE
A. Source Quality Control
1. Submit documentation to the Owner at least sixty (60) days prior to start of planting that all plant material has been ordered. Arrange procedure for observation of plant material with the Owner at time of submission. 265
Westacre Park Expansion and Renovation Project Section 02905 September 2024 Landscape Installation
02905-2
2. Plants shall be subject to observation and approval of the Owner upon delivery for conformity to specifications. Such approval shall not impair the right of observation and rejection during progress of the work.
1.04 PRODUCT DELIVERY, STORAGE AND HANDLING
A. Delivery
1. The Contractor, upon request by the Owner, shall provide receipts, delivery tickets, load tickets, etc. of all items delivered to the job site to verify products and total quantities.
2. Deliver fertilizer to site in original unopened containers bearing manufacturer's guaranteed chemical analysis, name trademark, and conformance to State Law.
3. Deliver plants with legible identification labels.
a. Label trees, evergreens, bundles of containers of like shrubs, or ground cover plants.
b. State correct plant name and size indicated on plant list. c. Use durable waterproof labels with water-resistant ink which will remain legible for at least sixty (60) days.
6. Protect plant material during delivery to prevent damage to root ball or desiccation of leaves.
7. The Contractor shall notify the Owner forty-eight (48) hours in advance of delivery of all plant materials for observation either at the site or at the local nursery.
B. Storage
1. Store plant material in shade and protect from weather.
2. Maintain and protect plant material. Contractor shall be responsible for replacement of material due to theft or vandalism.
C. Handling
1. Do not drop plant materials.
2. Do not pick up container plant material by stems or trunks.
1.05 JOB CONDITIONS
266
Westacre Park Expansion and Renovation Project Section 02905 September 2024 Landscape Installation
02905-3
A. Planting: Perform actual planting only when weather and soil conditions are suitable in accordance with locally accepted practice.
B. Scheduling: Install trees, shrubs, and ground cover plant material before lawn areas are installed and after irrigation system is operable.
C. Protect work and materials from damage due to construction operations by other contractors and trades and by vandalism. Maintain protection during installation.
1.06 SAMPLES AND TESTS
A. The Owner reserves the right to take and analyze samples of materials for conformity to specifications at any time. The Contractor shall furnish samples upon request by Owner. Rejected materials shall be immediately removed from the site at Contractor's expense. Cost of testing of materials not meeting specifications shall be paid by the Contractor.
B. Provide horticultural soils report of existing landscape soil after rough grade and submitted topsoil including information on soil texture, filtration rate, nutrient levels and organic matter. Include recommendation for amendment to be added to existing landscape soil and topsoil to mitigate any deficiencies.
1.07 GUARANTEE AND REPLACEMENT
A. Guarantee: All plant material and other materials installed under the Contract shall be guaranteed against any and all poor, inadequate or inferior materials and/or workmanship for a period of one (1) year. Any plant found to be dead or not in a satisfactory or healthy condition due to faulty materials, workmanship, or improper maintenance as determined by the, shall be replaced by the Contractor at his expense.
B. Replacement: Any materials found to be dead, missing or not in a satisfactory or healthy condition during the Contract period shall be replaced immediately. The Owner shall be the sole judge as to the condition of material. Material to be replaced within the guarantee period shall be replaced by the Contractor within fifteen (15) days of written notification by the Owner. All replacement materials and installation shall comply with the Drawings and Specifications.
PART 2 - PRODUCTS
2.01 GENERAL
All materials shall be of standard, approved and first-grade quality and shall be in prime condition when installed and accepted. Any commercially processed or packaged material shall be delivered to the site in the original unopened container bearing the manufacturer's guaranteed analysis. The Contractor shall supply the Owner with a sample of all supplied materials accompanied by analytical data from an approved laboratory source illustrating compliance of bearing the manufacturer's guaranteed analysis.
2.02 PRODUCTS
267
Westacre Park Expansion and Renovation Project Section 02905 September 2024 Landscape Installation
02905-4
A. Soil Conditioner
1. Gro-Power Plus: Humus (bacteria included based fertilizer and soil conditioner with soil penetrant shall consist of the following percents by weight:
5 % nitrogen
3 % phosphoric acid
1 % potash
50 % humus
15 % humic acids
B. Soil Amendment
1. Nitrogen Stabilized Shavings: 0.56 to 0.84% N based on dry weight for fir bark mulch, treated with relative form of nitrogen (NH3).
a. Particle Size: 95% - 100% passing 6.35 mm standard sieve. 80% - 100% passing 2.33 mm standard sieve.
b. Salinity: The saturation extract conductivity shall not exceed 3.5 mil/centimeter at 25 degrees (25°) centigrade as determined by saturation extract method.
c. Iron Content: Minimum 0.08% dilute acid soluble Fe on dry weight basis. d. Ash: 0 - 6.0% (dry weight)
C. Fertilizer
1. Fertilizer: Shall be Gro-Power Plus (bacteria included) with soil penetrant and shall consist of the following percents by weight:
5% nitrogen
3% phosphoric acid
1% potash
50% humus
15% humic acid
2. Fertilizer: Shall consist of the following percents by weight:
6% nitrogen
20% phosphoric acid
20% potash
3. Ammonia Sulfate: Shall consist of the following percents by weight:
21% nitrogen
0% phosphoric acid
0% potash
268
Westacre Park Expansion and Renovation Project Section 02905 September 2024 Landscape Installation
02905-5
4. Turf Starter Fertilizer: Shall consist of the following percents by weight:
16% nitrogen
6% phosphoric acid
8% potash
5. Planting Tablets: Slow-release 21 gram tablets as manufactured by Agriform or approved equal, containing the following percent-ages of nutrients by weight:
20 % nitrogen
10 % phosphoric acid
5 % potash
6. Inoculum: Shall be Grow-Life Mycorrhizal Inoculum / Soil Conditioner D. Imported Soil
1. Imported soil shall be obtained from a source approved by the Landscape Architect.
2. Imported topsoil shall be of friable sandy-loam texture free of refuse, roots, heavy or stiff clay, rocks, sticks, brush or other deleterious materials. Topsoil acidity range (pH) shall be between 6.5 to 7.5 containing a minimum of 4% and a maximum of 25% organic matter. Topsoil shall be free of all noxious weeds.
Topsoil samples and analysis shall be submitted to the Landscape Architect for approval prior to delivery of any soil to the project site. Should the Landscape Architect reject any portion of the delivered soil, for any reason, it shall be removed immediately at no cost to the Owner.
3. Topsoil, if rejected, shall be amended to meet specifications. Submit amended topsoil analysis to Landscape Architect for verification.
4. See also Landscape Grading Section 02260.
E. Plant Material
1. The plant material indicated on the Drawings by the listed names shall conform to "Standardized Plant Names", second edition, except for names not covered there in, the established customs of the nursery trade is followed. All plants shall be true to name, above one of each bundle or lot shall be tagged with the name and size of the plant, in accordance with the standards of practice recommended by the American Association of Nurserymen. All plant materials shall meet the specifications of Federal, State and County laws, requiring observation for plant diseases and insect infestations. Plants shall be symmetrical, typical for variety and species, sound, healthy, vigorous, free from plant diseases, insect pests or other eggs, and shall have healthy, normal root systems, while filling their containers, but not to the point of being root bound. Use only plant materials that are first class representative of the species and cultivars specifies and that 269
Westacre Park Expansion and Renovation Project Section 02905 September 2024 Landscape Installation
02905-6
conform to all State and local laws governing the sale, transportation, and observation of plant materials. Plants shall have straight, single trunks, unless otherwise specified on the plans. Those specified to be multi-trunk shall have at least three (3) main leaders from the base. Any and all plants that have any encircling roots (not root bound) shall have root balls lightly slashed on a minimum of three (3) sides to stop encircling root growth. The height and spread of all plant materials shall be measured with branches in their normal position.
Sizes of plants shall be as stated on the plant list, five and fifteen (5 & 15) gallon can container stock shall have been grown in that container not less than six (6) months, but shall not have been overgrown in the containers so as to have become root bound.
2. The size of the plants will correspond with that normally expected for species and variety of commercially available nursery stock or as specified in the Special Conditions or Drawings. The minimum acceptable size of all plants, measured before pruning with the branches in normal position, shall conform with the measurements, if any, specified on the Drawings in the list of plants to be furnished. Plants larger in size than specified may be used with the approval of the Owner, but if the use of larger plants is approved, the ball of earth or spread of roots for each plant will be increased proportionally. Plant material shall conform to the following Specifications for container stock: