Cities Index.
Agenda packet

West Sacramento City Council
July 16, 2025

Document
Agenda packet
Meeting
July 16, 2025
Body
West Sacramento City Council
Pages
47
Original file
69.1 MB
Text extracted from the city's file for reading and search. Open the original on westsac.hylandcloud.com. That file is the official record.

Environmental Considerations
It has been determined that the appropriate level of environmental review for procurement and installation of traffic signal equipment is a Categorical Exemption as identified under California Code of Regulations, Title 14, Division 6, Chapter 3, Section 15301 Class 1 (b) of the California Environmental Quality Act. This is a rehabilitation and/or maintenance of existing traffic signals involving no expansion of use beyond the existing.

Commission Recommendation
N/A
Strategic Plan Integration
N/A
Alternatives
The Council’s primary alternatives are summarized below:
1) Approve the recommended actions as described above in this report. 2) Alter the recommended actions.
3) Delay the recommended actions or cancel the project.

Staff recommend that the Council proceed with Alternative 1 to allow for the installation of an improved and effective GPS system to enhance responsiveness and safety for emergency vehicles and personnel.

Coordination and Review
This report was prepared by the Capital Projects Department, and has been coordinated with, and reviewed by the Finance Department.

Budget/Cost Impact
This project is included in the City’s Capital Improvement Program (CIP) as CIP 12026. There is sufficient funding in the CIP project to cover the costs of this contract. The tables below provide the approved budget and estimated costs associated with this contract.

Table 1: Emergency Vehicle GPS Budget
CIP 12026 Amount
Local Funds (three-way split: one-time General Fund,
Measure N Police and Measure N Fire) $500,000.00
Transfer funding from project #12024 $1,000,000.00
Measure O Funds (three-way split: one-time General
Fund, Measure N Police and Measure N Fire. $500,000.00
Total Funding Approved 2,000,000.00
Table 2: Detailed Services Contract Funding Breakdown
Upfitting Services Contract Amount
Services Contract (NextGen Alpha Upfitting) $476,728.74 Contract Contingency (20%) $95,345.75
Staff Time & ICAP (15%) $71,509.31
Total Estimated Costs $643,583.80

ATTACHMENTS

1. NextGen Alpha Upfitting – Services Contract

2. Notice of Exemption (NOE)

3. Project Vicinity Map
198
NextGen Alpha Upfitting
CPC25-191 Emergency Vehicle Preemption - GPS Furnish & Install Expires on 06/01/2026
1 11.4.2024

CONTRACT FOR SERVICES
THIS CONTRACT is made on July 16, 2025, by and between the CITY OF WEST SACRAMENTO (“City”), and NextGen Alpha Upfitting (“Consultant”).

WITNESSETH:

WHEREAS, the City desires a vendor to provide the City’s GPS Emergency Vehicle Preemption GPS/EVP response equipment (“Goods”) and installation services (“Services”) for emergency vehicles and upfitting;
WHEREAS, the Consultant has presented a proposal for such services to the City, dated June 03, 2025, (attached hereto as Exhibit “A”) and is duly licensed, qualified and experienced to perform those services;
NOW, THEREFORE, the parties hereto mutually agree as follows:

1. SCOPE OF SERVICES:

A. Consultant shall do all work, attend all meetings, produce all reports and carry out all activities necessary to completion of the services described in Exhibit “A”. This Contract and its exhibits shall be known as the “Contract Documents.” Terms set forth in any Contract Document shall be deemed to be incorporated in all Contract Documents as if set forth in full therein. In the event of conflict between terms contained in these Contract Documents, the more specific term shall control. If any portion of the Contract Documents shall be in conflict with any other portion, provisions contained in the Contract shall govern over conflicting provisions contained in the exhibits to the Contract.

B. Consultant enters into this Contract as an independent contractor and not as an employee of the City. The Consultant shall have no power or authority by this Contract to bind the City in any respect. Nothing in this Contract shall be construed to be inconsistent with this relationship or status. All employees, agents, contractors or subcontractors hired or retained by the Consultant are employees, agents, contractors or subcontractors of the Consultant and not of the City. The City shall not be obligated in any way to pay any wage claims or other claims made against Consultant by any such employees, agents, contractors or subcontractors, or any other person resulting from performance of this Contract. In the event that Consultant or any employee, agent, or subcontractor of Consultant providing services under this Agreement claims or is determined by a court of competent jurisdiction or the California Public Employees Retirement System (PERS) to be eligible for enrollment in PERS as an employee of the City, Consultant shall indemnify, defend, and hold harmless City for the payment of any employee and/or employer contributions for PERS benefits on behalf of Consultant or its employees, agents, or subcontractors, as well as for the payment of any penalties and interest on such contributions, which would otherwise be the responsibility of City. Notwithstanding any other agency, state or federal policy, rule, regulation, law or ordinance to the contrary, To the greatest extent permitted by law, Consultant and its employees, agents, and subcontractors shall not qualify for or become entitled to, and hereby agree to waive any claims to, any compensation, benefit, or any incident of employment by City, including but not limited to eligibility to enroll in PERS as an employee of City and entitlement to any contribution to be paid by City for employer contribution and/or employee contributions for PERS benefits.
199
NextGen Alpha Upfitting
CPC25-191 Emergency Vehicle Preemption - GPS Furnish & Install Expires on 06/01/2026
2 11.4.2024
C. The Consultant agrees it has satisfied itself by its own investigation and research regarding the conditions affecting the work to be done and labor and materials needed, and that its decision to execute this Contract is based on such independent investigation and research.

2. TERM OF CONTRACT
A. The services of Consultant are to commence upon execution of this Contract by the City, and shall be undertaken and completed in accordance with the Schedule of Performance attached hereto and incorporated herein by this reference as Exhibit “B” and terminate on June 01, 2026.

B. Consultant’s failure to complete work in accordance with the Schedule of Performance may result in delayed compensation as described in Section 3.

C. The City Manager or his or her designee may, by written instrument signed by the Parties, extend the duration of this Contract for two (2) additional one-year extensions in the manner provided in Section 5, provided that the extension does not require the payment of compensation in excess of the Council approved budget.

3. COMPENSATION:

A. The Consultant shall be paid at the completion of services for the actual fees, costs and expenses for all time and materials required and expended, but in no event shall total compensation exceed Four Hundred Seventy Six Thousand Seven Hundred Twenty Eight and Seventy Four cents ($476,728.74), without City’s prior written approval. Consultant's fees shall be as specified in the Schedule of Fees, which is attached hereto an incorporated herein as Exhibit "C".

B. Said amount shall be paid upon submittal of a final billing showing completion of the tasks. Consultant shall furnish City with invoices for all expenses as well as for all materials authorized by this Contract. The invoice shall be submitted with the final billing. If Consultant’s performance is not in conformity with the Schedule of Performance, payments may be delayed or denied, unless the Consultant’s failure to perform in conformity with the Schedule of Performance is a documented result of the City’s failure to conform with the Schedule of Performance, or if the Schedule of Performance is extended pursuant to Section 5.

C. If the work is halted at the request of the City, compensation shall be based upon the proportion that the work performed bears to the total work required by this Contract, subject to Section 4.

4. TERMINATION:

A. This Contract may be terminated by either party, provided that the other party is given not less than thirty (30) calendar days’ written notice (delivered by certified mail, return receipt requested) of intent to terminate.

B. The City may temporarily suspend this Contract, at no additional cost to City, provided that the Consultant is given written notice (delivered by certified mail, return receipt requested) of temporary suspension. If City gives such notice of temporary suspension, Consultant shall immediately suspend its activities under this Contract. 200
NextGen Alpha Upfitting
CPC25-191 Emergency Vehicle Preemption - GPS Furnish & Install Expires on 06/01/2026
3 11.4.2024
C. Notwithstanding any provisions of this Contract, Consultant shall not be relieved of liability to the City for damages sustained by the City by virtue of any breach of this Contract by Consultant, and the City may withhold any payments due to Consultant until such time as the exact amount of damages, if any, due the City from Consultant is determined.

D. In the event of termination, the Consultant shall be compensated as provided for in this Contract, except as provided in Section 4C. Upon termination, the City shall be entitled to all work, including but not limited to, appraisals, inventories, studies, analyses, drawings and data estimates performed to that date in accordance with Section 7 hereof.

5. AMENDMENTS, CHANGES OR MODIFICATIONS:

Amendments, changes or modifications in the terms of this Contract may be made at any time by mutual written agreement between the parties hereto and shall be signed by the persons authorized to bind the parties hereto.

6. EXTENSIONS OF TIME:

Consultant may, for good cause, request extensions of time to perform the services required hereunder. Such extensions shall be authorized in advance by the City in writing and shall be incorporated in written amendments to this Contract or the attached Work Program in the manner provided in Section 5.

7. PROPERTY OF CITY:

A. It is mutually agreed that all materials prepared by the Consultant under this Contract shall become the property of the City, and the Consultant shall have no property right therein whatsoever. Immediately upon termination, the City shall be entitled to, and the Consultant shall deliver to the City, all data, drawings, specifications, reports, estimates, summaries and other such materials as may have been prepared or accumulated to date by the Consultant in performing this Contract which is not Consultant’s privileged information, as defined by law, or Consultant’s personnel information, along with all other property belonging exclusively to the City which is in the Consultant’s possession.

B. Additionally, it is agreed that the parties intend this to be a contract for services and each considers the products and results of the services to be rendered by Consultant hereunder (the “Work”) to be a work made for hire. Consultant acknowledges and agrees that the Work (and all rights therein, including, without limitation, copyright) belongs to and shall be the sole and exclusive property of the City.

8. COMPLIANCE WITH ALL LAWS:

A. Consultant shall comply with all applicable laws, ordinances, and codes of federal, State and local governments, and shall commit no trespass on any public or private property in performing any of the work authorized by this Contract.

B. Consultant warrants to the City that it is licensed by all applicable governmental bodies to perform this Contract and will remain so licensed throughout the progress of the Work, and that it has, and will have, throughout the progress of the Work, the necessary experience, skill and financial resources to enable it to perform this Contract. 201
NextGen Alpha Upfitting
CPC25-191 Emergency Vehicle Preemption - GPS Furnish & Install Expires on 06/01/2026
4 11.4.2024

9. WARRANTIES AND RESPONSIBILITIES - CONSULTANT:

A. Consultant agrees and represents that it is qualified to properly provide the services set forth in Exhibit “A” in a manner which is consistent with the generally accepted standards of Consultant’s profession.

B. Consultant agrees and represents that the work performed under this Contract shall be in accordance with applicable federal, State and local law in accordance with Section 17A hereof.

C. Consultant shall designate a project manager who at all times shall represent the Consultant before the City on all matters relating to this Contract. The project manager shall continue in such capacity unless and until he or she is removed at the request of the City, is no longer employed by Consultant, or is replaced with the written approval of the City, which approval shall not be unreasonably withheld.

D. Consultant shall provide corrective services without charge to the City for services which fail to meet the above professional and legal standards and which are reported to Consultant in writing within sixty (60) days of discovery. Should Consultant fail or refuse to perform promptly its obligations, the City may render or undertake performance thereof and the Consultant shall be liable for any expenses thereby incurred.

10. SUBCONTRACTING:

None of the services covered by this Contract shall be subcontracted without the prior written consent of the City, which will not be unreasonably withheld. Consultant shall be as fully responsible to the City for the negligent acts and omissions of its contractors and subcontractors, and of persons either directly or indirectly employed by them, as it is for the negligent acts and omissions of persons directly employed by Consultant.

11. ASSIGNABILITY:

Consultant shall not assign or transfer any interest in this Contract whether by assignment or novation, without the prior written consent of the City which will not be unreasonably withheld.

However, claims for money due or to become due Consultant from the City under this Contract may be assigned to a financial institution, or to a trustee in bankruptcy, without such approval.

Notice of any assignment or transfer whether voluntary or involuntary shall be furnished promptly to the City.

12. INTEREST IN CONTRACT:

Consultant covenants that neither it, nor any of its employees, agents, contractors, subcontractors has any interest, nor shall they acquire any interest, direct or indirect, in the subject of the Contract, nor any other interest which would conflict in any manner or degree with the performance of its services hereunder. Consultant shall make all disclosures required by the City’s conflict of interest code in accordance with the category designated by the City, unless the City Manager determines in writing that Consultant’s duties are more limited in scope than is warranted by the category designated by the City code and that a narrower disclosure category should apply. Consultant also agrees to make disclosure in compliance with the City conflict of interest code if, at any time after the execution of this Contract, City determines and notifies Consultant in writing that Consultant’s duties under this Contract warrant greater disclosure by 202
NextGen Alpha Upfitting
CPC25-191 Emergency Vehicle Preemption - GPS Furnish & Install Expires on 06/01/2026
5 11.4.2024
Consultant than was originally contemplated. Consultant shall make disclosures in the time, place and manner set forth in the conflict of interest code and as directed by the City.

13. MATERIALS CONFIDENTIAL:

All of the materials prepared or assembled by Consultant pursuant to performance of this Contract are confidential and Consultant agrees that they shall not be made available to any individual or organization without the prior written approval of the City, except by court order.

14. LIABILITY OF CONSULTANT-NEGLIGENCE:

Consultant shall be responsible for performing the work under this Contract in a manner which is consistent with the generally-accepted standards of the Consultant’s profession and shall be liable for its own negligence and the negligent acts of its employees, agents, contractors and subcontractors. The City shall have no right of control over the manner in which the work is to be done but only as to its outcome, and shall not be charged with the responsibility of preventing risk to Consultant or its employees, agents, contractors or subcontractors.

15. INDEMNITY AND LITIGATION COSTS:

Consultant shall indemnify, defend, and hold harmless the City, its officers, officials, agents, and employees against all claims, damages, demands, liability, costs, losses and expenses, including without limitation court costs and reasonable attorneys’ fees, arising from Consultant's negligent acts or negligent failure to act, errors, omissions or willful misconduct incident to the performance of this Contract except such loss or damage caused by the active negligence, sole negligence, or willful misconduct of the City. The provisions of this paragraph shall survive termination or suspension of this Contract.

16. CONSULTANT TO PROVIDE INSURANCE:

A. Consultant shall not commence any work before obtaining, and shall maintain in force at all times during the duration and performance of this Contract, the policies of insurance specified in this Section. Such insurance must have the approval of the City as to limit, form, and amount, and shall be placed with insurers with a current A.M. Best’s rating of no less than A VII (an NR rating is acceptable for Worker’s Compensation insurance written with the State Compensation Insurance Fund of California).

B. Prior to execution of this Contract and prior to commencement of any work, the Consultant shall furnish the City with certificates of insurance and copies of endorsements providing evidence of coverage for all policies required by the Contract. The Consultant and its contractors and subcontractors shall, at their expense, maintain in effect at all times during the performance of work under the Contract not less than the following coverage and limits of insurance, which shall be maintained with insurers and under forms of policy satisfactory to the City. The maintenance by Consultant and its contractors and subcontractors of the following coverage and limits of insurance is a material element of this Contract. The failure of Consultant or of any of its contractors or subcontractors to maintain or renew coverage or to provide evidence of renewal may be treated by the City as a material breach of this Contract. Approval of the insurance by the City shall not relieve or decrease any liability of Consultant.

1. Worker’s Compensation and Employer’s Liability Insurance 203
NextGen Alpha Upfitting
CPC25-191 Emergency Vehicle Preemption - GPS Furnish & Install Expires on 06/01/2026
6 11.4.2024

a. Worker’s Compensation - Insurance to protect the Consultant, its contractors and subcontractors from all claims under Worker’s Compensation and Employer’s Liability Acts, including Longshoremen’s and Harbor Worker’s Act (“Acts”), if applicable. Such coverage shall be maintained, in type and amount, in strict compliance with all applicable state and Federal statutes and regulations.

The Consultant shall execute a certificate in compliance with Labor Code Section 1861, on the form provided in the Contract Documents.
b. Consultant shall provide a Waiver of Subrogation endorsement in favor of the City, its officers, officials, employees, agents and volunteers for losses arising from work performed by the Consultant.

2. Commercial General Liability Insurance
a. The insurance shall be provided on form CG0001, or it’s equivalent, and shall include coverage for claims for bodily injury or property damage arising out of premises/operations, products/completed operations, contractual liability, and subconsultant’s work and personal and advertising injury resulting from actions, failures to act, or operations of the insured, or by its employees or agents, or by anyone directly or indirectly employed by the insured. The amount of insurance coverage shall not be less than $1,000,000 per occurrence and $2,000,000 general and products/completed operations aggregates. b. The commercial general liability insurance shall also include the following:
i. Endorsement equivalent to CG 2010 0714 naming the City, its officers, officials, employees, agents, and volunteers as additional insureds. The endorsement shall contain no special limitations on the scope of protection afforded to the City, its officers, officials, employees or volunteers.
ii. Endorsement stating insurance provided to the City shall be primary as respects the City, its officers, officials, employees and any insurance or self insurance maintained by the City, its officers, officials, employees or volunteers shall be in excess of the Consultant’s insurance and shall not contribute with it, to the payment or satisfaction of any defense expenses, loss, or judgment.
iii. Provision or endorsement stating that the Consultant’s insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the limits of the insurer’s liability.

3. Commercial Automobile Insurance
a. The insurance shall include, but shall not be limited to, coverage for claims for bodily injury or property damage for owned, non-owned, and hired automobiles resulting from actions, failures to act, or operations of the insured, or by its employees or agents, or by anyone directly or indirectly employed by the 204
NextGen Alpha Upfitting
CPC25-191 Emergency Vehicle Preemption - GPS Furnish & Install Expires on 06/01/2026
7 11.4.2024
insured. The amount of insurance coverage shall not be less than $1,000,000 per accident.
b. The commercial automobile insurance shall include the same endorsements required for the commercial general liability policy (see Section

16.B.2.b).

4. Professional Liability. The Consultant and its contractors and subcontractors shall secure and maintain in full force, during the term of this Contract and for five years thereafter, professional liability insurance policies appropriate to the respective professions and the work to be performed as specified in this Contract. The limits of such professional liability insurance coverage shall not be less than $1,000,000 per claim.

C. In addition to any other remedy the City may have, if Consultant fails to maintain the insurance coverage as required in this Section, the City may obtain such insurance coverage as is not being maintained, in form and amount substantially the same as is required herein, and the City may deduct the cost of such insurance from any amounts due or which may become due Consultant under this Contract.

D. No policy required by this Contract shall be suspended, cancelled, terminated by either party, or reduced in coverage or in limits unless Consultant has provided thirty (30) days prior written notice by certified mail, return receipt requested, to the City.

E. Any deductibles or self-insured retentions in excess of $10,000 must be declared to, and approved by, the City.

F. The requirement as to types, limits, and the City’s approval of insurance coverage to be maintained by Consultant are not intended to, and shall not in any manner, limit or qualify the liabilities and obligations assumed by Consultant under the Contract.

17. MISCELLANEOUS PROVISIONS:

A. Consultant shall keep itself fully informed of, shall observe and comply with, and shall cause any and all persons, firms or corporations employed by it or under its control to observe and comply with, applicable federal, state, county and municipal laws, ordinances, regulations, orders and decrees which in any manner affect those engaged or employed on the work described by this Contract or the materials used or which in any way affect the conduct of the work.

B. Consultant shall not engage in unlawful employment discrimination. Such unlawful employment discrimination includes, but is not limited to, employment discrimination based upon a person’s race, religious creed, color, national origin, ancestry, physical handicap, medical condition, marital status, gender, citizenship, or sexual orientation.

C. Consultant shall maintain and make available for inspection by the City and its auditors accurate records of all of its costs, disbursements and receipts with respect to any work under this Contract. Such inspections may be made during regular office hours at any time until six (6) months after the final payments under this Contract are made to the Consultant. 205
NextGen Alpha Upfitting
CPC25-191 Emergency Vehicle Preemption - GPS Furnish & Install Expires on 06/01/2026
8 11.4.2024
D. This Contract constitutes the entire agreement between the parties relative to the services specified herein and no modification hereof shall be effective unless and until such modification is evidenced by a writing signed by both parties to this Contract. There are no understandings, agreements, conditions, representations, warranties or promises, with respect to this Contract, except those contained in or referred to in the writing.

E. All notices that are required to be given by one party to the other under this Contract shall be in writing and shall be deemed to have been given if delivered personally or enclosed in a properly addressed envelope and deposited in a United States Post Office for delivery by registered or certified mail addressed to the parties at the following addresses:

City: City of West Sacramento
Attn to: Joshua Bailey
Address: 1110 West Capitol Avenue, 1st Floor
Address: West Sacramento, CA 95691
Email: [email protected]

Consultant:

NextGen Alpha Upfitting
Attn to: Sumeet Singh
Address: 8400 Carbide Ct A
Address: Sacramento, CA 95828
Email: [email protected]

F. This Contract shall be interpreted and governed by the laws of the State of California.

G. Any action arising out of this Contract shall be brought and maintained in Yolo County California, regardless of where else venue may lie.

H. In any action brought by either party to enforce the terms of this Contract, each party shall be bear responsibility for its attorney’s fees and all costs regardless of whether one party is determined to be the prevailing party.

I. ELECTRONIC TRANSMISSION OF CONTRACT AND SIGNATURE. By electronically signing this document in electronic form, Parties agree that this Agreement may be transmitted and signed electronically by all Parties, and that such signatures shall have the same force and effect as original signatures, in accordance with California law and regulations, including but not limited to Civil Code Section 1633.7
[Signatures on following page]
206
NextGen Alpha Upfitting
CPC25-191 Emergency Vehicle Preemption - GPS Furnish & Install Expires on 06/01/2026
9 11.4.2024

CITY OF WEST SACRAMENTO
By: __________________________
Amanda Berlin, Assistant City Manager
ATTEST:

By: _______________________
Jennifer Cusmir, City Clerk
APPROVED AS TO FORM:

By: _______________________
Jeffrey Mitchell, City Attorney

NEXTGEN ALPHA UPFITTING
By: _________________________
Sumeet Singh, Government Account Manager
207
NextGen Alpha Upfitting
CPC25-191 Emergency Vehicle Preemption - GPS Furnish & Install Expires on 06/01/2026

EXHIBIT A
Consultant Proposal/Scope of Work
208
NextGen Alpha Upfitting
CPC25-191 Emergency Vehicle Preemption - GPS Furnish & Install Expires on 06/01/2026

EXHIBIT B
Schedule of Performance
Contract Start Date July 16th, 2025
Contract End Date June 1st, 2026
209
NextGen Alpha Upfitting
CPC25-191 Emergency Vehicle Preemption - GPS Furnish & Install Expires on 06/01/2026

EXHIBIT C
Schedule of Fees
210
NextGen Alpha Upfitting
CPC25-191 Emergency Vehicle Preemption - GPS Furnish & Install Expires on 06/01/2026

EXHIBIT D
CERTIFICATE OF COMPLIANCE WITH LABOR CODE § 3700
[Labor Code § 1861]
I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for workers’ compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract.

CONSULTANTS
By:

Sumeet Singh, Government Account Manager
211
NextGen Alpha Upfitting
CPC25-191 Emergency Vehicle Preemption - GPS Furnish & Install Expires on 06/01/2026

EXHIBIT E

LABOR COMPLIANCE

1. PREVAILING WAGE
A. The Work contemplated herein constitutes a public work within the meaning of Labor Code sections 1720 and 1771. It shall be mandatory upon the Consultant and upon any Subcontractor, to pay not less than the said specified prevailing rates of wages to all workers employed by them under the Contract in accordance with Labor Code section 1774. The Director of the Department of Industrial Relations ("DIR") of the State of California has determined the general prevailing rate of wages of per diem wages in the locality in which the work is to be performed for each craft or type of worker needed to execute the Contract. The Consultant acknowledges that it has examined the prevailing rate of per diem wages as established by the DIR. Copies of the current schedules for prevailing wages are on file at City Hall, and the contents of those schedules are incorporated herein as if set forth in full. The Consultant shall post a copy of the applicable prevailing wage determinations at each job site, along with any other work place posters required by law.

B. The City will not recognize any claims for additional compensation because of the payment of prevailing wages. The possibility of wage increases is one of the elements to be considered by the Consultant in determining its proposal, and will not under any circumstances be considered as the basis of a claim against the City.

C. By executing this Contract Consultant warrants that it has registered with the Department of Industrial Relations in accordance with Labor Code section 1725.5.

2. PREVAILING WAGE RECORDS
A. The Consultant and each subcontractor shall keep an accurate payroll record which shows the name, address, social security number, correct work classification (in accordance with the wage decision), both straight and overtime worked each day and week, and hourly rate of pay, gross wages earned, deductions made and net wages paid to each journeyman, apprentice, worker or other employee paid by the Consultant /subcontractor in connection with the Work. These payroll records shall be certified and shall be made available at Consultant's principal office. These records shall be maintained during the course of the Work. The Consultant and all subcontractors shall make the certified payroll records available for inspection by City representatives upon request and shall permit such representatives to interview employees during the work hours on the job site.

B. The City shall notify the Consultant in writing of any discrepancies or violations that are discovered during such inspections. Written notification pursuant to this Section shall include the actions that will be necessary to resolve the discrepancies and/or violations. The Consultant shall be held entirely responsible for the prompt resolution of all non-compliances with the prevailing wage laws, including those pertaining to all subcontractors and any lower-tier subcontractors. The Consultant shall forfeit as penalty to the City the amount specified by law for each calendar day or portion thereof for each worker (whether employed by the Consultant or any subcontractor) paid less than the stipulated prevailing rates for any work done under the Contract in violation of the provisions of the Labor Code and in particular, Section 1775.

C. To the extent applicable, Consultant and subcontractors shall maintain and furnish to the Department of Industrial Relations ("DIR"), a certified copy of each weekly payroll (but no less 212
NextGen Alpha Upfitting
CPC25-191 Emergency Vehicle Preemption - GPS Furnish & Install Expires on 06/01/2026
often than monthly), with a statement of compliance signed under penalty of perjury. Such certified payroll reports shall be transmitted electronically to the DIR.

D. The City will not recognize any claims for additional compensation because of the payment of the prevailing wages. The possibility of wage increases is one of the elements to be considered by the Consultant in entering into the Contract, and will not under any circumstances, other than delays caused by the City, or the City’s agents, be considered as the basis of a claim against the City.

3. Labor Discrimination
Attention is directed to Section 1735 of the Labor Code, which reads as follows:
“No discrimination shall be made in the employment of persons upon public works because of their race, color, national origin or ancestry, physical handicap, mental condition, marital status, or sex of such person, except as provided in Section 12940 of the Government Code, and every General Contractor for public works violating this section is subject to all the penalties imposed for a violation of this chapter.” 4 Eight-Hour Day Limitation
(a) In accordance with the provisions of the Labor Code, and in particular, Sections 1810 to 1815 thereof, inclusive, incorporated herein by reference, eight hours labor shall constitute a day's work, and no worker in the employ of Consultant, or any Subcontractor, doing or contracting to do any part of the work contemplated by the Contract, shall be required or permitted to work more than eight (8) hours in any one calendar day and forty (40) hours in any one calendar week in violation of those provisions; provided that subject to Labor Code Section 1815, a worker may perform work in excess of either eight (8) hours per day or forty (40) hours during any one week upon compensation for all hours worked in excess of eight (8) hours per day or forty (40) hours during any one week at not less than one and one-half times the basic rate of pay. (b) The Consultant and each Subcontractor shall also keep an accurate record showing the names and actual hours worked of all workers employed by them in connection with the Contract.

This record shall be open at all reasonable hours to the inspection of the City. It is hereby further agreed that, except as provided in (a) above, the Consultant shall forfeit as a penalty to the City the sum of twenty-five dollars ($25) for each worker employed in the performance of the Contract by the Consultant or by any of its Subcontractors for each calendar day during which such worker is required or permitted to labor more than eight (8) hours in and one calendar day and forty (40) hours in any one calendar week in violation of Sections 1810 through 1815.

5. Compliance with State Requirements for Employment of Apprentices (a) The Consultant's attention is directed to Section 1777.5 of the Labor Code.

Provisions of said Section pertaining to employment of registered apprentices are hereby incorporated by reference into this Contract. As applicable, the Consultant or any Subcontractor employed by the Consultant in the performance of this Contract shall take such actions as necessary to comply with the provisions of Section 1777.5.
213
Revised 2011
Notice of Exemption Appendix E
To: Office of Planning and Research From: (Public Agency): City of West Sacramento P.O. Box 3044, Room 113
Sacramento, CA 95812-3044
County Clerk
County of: Y OLO
1110 West Capitol Ave
West Sacramento, CA 95691
(Address)
625 COURT STREET,
WOODLAND, CA 95696
Project Title: Emergency Vehicle Preemption (EVP) Vehicle Kit Installation Project Applicant: NextGen Alpha Upfitting
Project Location - Specific:

For 107 vehicles serving Citywide (56 traffic signal locations) Project Location - City: West Sacramento Project Location - County: YOLO Description of Nature, Purpose and Beneficiaries of Project:

Installation of GPS EVP vehicle kits on one hundred seven (107) City operated vehicles for Fire & Police Department
Name of Public Agency Approving Project: City of West Sacramento Name of Person or Agency Carrying Out Project: Joshua Bailey Exempt Status: (check one):

Ministerial (Sec. 21080(b)(1); 15268);
Declared Emergency (Sec. 21080(b)(3); 15269(a));
Emergency Project (Sec. 21080(b)(4); 15269(b)(c));
Categorical Exemption. State type and section number: 15301 Class 1(b) Statutory Exemptions. State code number:

Reasons why project is exempt:

The California Environmental Quality Act Title 14, Chapter 3, Article 19 defines what projects or categories are allowed to be considered Categorically Exempt. Section 15301, Class 1(b) allows public entities to perform operations such as repair, maintenance, or minor alteration of existing public structures, facilities, or topographical features, involving negligible or no expansion of use beyond that existing at the time of the lead agency's determination without review of the project under CEQA. The EMERGENCY VEHICLE PREEMPTION (EVP) Project falls under the category of a rehabilitation and/or maintenance of existing structures involving no expansion of use beyond the existing.

Lead Agency
Contact Person: Joshua Bailey Area Code/Telephone/Extension: 916-617-4720 If filed by applicant:

1. Attach certified document of exemption finding.

2. Has a Notice of Exemption been filed by the public agency approving the project? (X)Yes No Signature: Date: 7/16/2025 Title: Project Manager II
(X) Signed by Lead Agency Signed by Applicant
Authority cited: Sections 21083 and 21110, Public Resources Code. Date Received for filing at OPR:

Reference: Sections 21108, 21152, and 21152.1, Public Resources Code.

X
ATTACHMENT 2
214
215
Attachment A-2: Traffic Signal Index
This index provides a reference for all traffic signals within the city, organized by owner and then by signal number. It serves as a companion document to the traffic signal map.

Caltrans-Owned Traffic Signals
Jefferson Blvd:
• 1 - Jefferson Blvd I-50WB
• 2 - Jefferson Blvd I-50EB
Harbor Blvd:
• 3 - Harbor Blvd I-50WB
• 4 - Harbor Blvd I-50EB
Reed Ave:
• 7 - Reed Ave I-80WB
• 8 - Reed Ave I-80EB
Enterprise Blvd:
• 6 - Enterprise Blvd I-80EB
West Capitol Ave:
• 5 - West Capitol Ave I-80WB
City of West Sacramento-Owned Traffic Signals
Tower Bridge Gateway:
• 35 - Tower Bridge Gateway @ 3rd
St/Riverfront St
• 36 - Tower Bridge Gateway @ 5th St
• 37 - Tower Bridge Gateway @ Grand
St/Delta Ln
• 53 - Tower Bridge Gateway @ 7th St
3rd St:
• 39 - 3rd St @ C St
• 40 - 3rd St @ E St
• 41 - 3rd St @ F St/Waterfront Pl
• 42 - 3rd St @ G St
5th St:
• 43 - 5th St @ C St
Enterprise Blvd:
• 28 - Enterprise Blvd @ Lake Rd
Harbor Blvd:
• 16 - Harbor Blvd @ Reed Ave/Sacramento
Ave
• 17 - Harbor Blvd @ Riverpoint Ct
• 18 - Harbor Blvd @ Duluth St
• 19 - Harbor Blvd @ Rice Ave
• 20 - Harbor Blvd @ West Capitol Ave
• 21 - Harbor Blvd @ Evergreen Ave
• 22 - Harbor Blvd @ Beacon Blvd
• 23 - Harbor Blvd @ Industrial Blvd
• 24 - Harbor Blvd @ Del Monte St
Industrial Blvd:
• 26 - Industrial Blvd @ Terminal St./Port
Access Rd.
• 27 - Industrial Blvd @ Enterprise Blvd
Jefferson Blvd:
• 1 - Jefferson Blvd @ Marshall Rd
• 2 - Jefferson Blvd @ S. Linden Rd
• 3 - Jefferson Blvd @ Higgins Rd
• 4 - Jefferson Blvd @ N. Linden Rd
• 5 - Jefferson Blvd @ Lake Washington Blvd
• 6 - Jefferson Blvd @ Devon/Gateway
216
• 7 - Jefferson Blvd @ Valley Oak Lane
(Monticello)
• 8 - Jefferson Blvd @ Locks Dr
• 9 - Jefferson Blvd @ Stone Blvd
• 10 - Jefferson Blvd @ 15th St
• 11 - Jefferson Blvd @ Merkley Ave
• 12 - Jefferson Blvd @ West Capitol Ave
• 13 - Jefferson Blvd @ Michigan Blvd
• 14 - Jefferson Blvd @ F St/Triangle Ct.
• 15 - Jefferson Blvd/Kegle Dr @
Sacramento Ave
Lake Washington Blvd:
• 29 - Lake Washington Blvd @ Southport
Parkway
• 30 - Lake Washington Blvd @ Town Center
(Inactive)
Lighthouse Dr:
• 49 - Lighthouse Dr @ Fountain
Dr/Watercolor Ln
Reed Ave:
• 25 - Reed @ Ikea Ct/Riverpoint Dr
Sacramento Ave:
• 47 - Sacramento Ave @ Sierra
Pl/Todhunter Ave
• 48 - Sacramento Ave @ Bryte Ave
South River Rd:
• 50 - South River Rd @ 15th St
• 51 - South River Rd @ Clark Pacific
• 52 - South River Rd @ Clark Trucking
Southport Parkway:
• 44 - Southport Parkway @ Ramco St
• 45 - Southport Parkway @ Carlin Dr
• 46 - Southport Parkway @ Promenade St
• 54 - Southport Parkway @ Audubon
Dr/Ramos
West Capitol Ave:
• 31 - West Capitol Ave @ Westacre Rd
• 32 - West Capitol Ave @ Poplar Ave
• 33 - West Capitol Ave @ Merkley
Ave/Casa Mobile Cir
• 34 - West Capitol Ave @ Grand St
Westacre Rd:
• 38 - Westacre Rd @ Merkley Ave
217

CITY COUNCIL AGENDA REPORT
MEETING DATE: July 16, 2025 ITEM # 10
SUMMARY:

CONSIDERATION OF RESOLUTION 25-76 APPROVING THE SEWER SYSTEM

MANAGEMENT PLAN (SSMP) UPDATE
INITIATED OR REQUESTED BY: REPORT COORDINATED OR PREPARED BY:
[ ] Council [X] Staff
[ ] Other
Amber Wallace, Senior Civil Engineer
Capital Projects Department
ATTACHMENT [ X ] Yes [ ] No [ ] Information [ ] Direction [ X ] Action

OBJECTIVE
The objective of this report is to provide sufficient information to the City Council for it to adopt Resolution 25-76 approving the Sewer System Management Plan (SSMP) Update.

RECOMMENDED ACTION
Staff respectfully recommends that the City Council approve Resolution 25-76 approving the Sewer System Management Plan Update.

BACKGROUND
The City owns and operates a sanitary sewer system for the benefit of its citizens, businesses, and commercial and industrial customers. The system is regulated by the State Water Resources Control Board (State Water Board) because of threats that spills and overflows may occur. Since December 2006, the City has been enrolled in the Statewide Sanitary Sewer Systems General Order (General Order). The intent of the General Order is to provide a consistent, statewide regulatory approach to address sewage spills.

The first State Water Board adopted General Order, Order No. 2006-0003, was adopted on May 2, 2006. A “Reissued General Order” (Order No. 2022-0103-DWQ) was adopted on December 6, 2022, and became effective on June 5, 2023. The City is currently enrolled in the “Reissued General Order.” The “original” and “reissued” General Order have always required that the City develop, implement, and maintain a Sewer System Management Plan (SSMP) to proactively manage the system, reduce spill frequencies, and respond quickly to any spill that may occur. As the centerpiece for compliance with the General Order, the City has maintained the SSMP as required by the General Order. This is the third SSMP update. The original SSMP was adopted in 2008, revised in 2015, and revised again in 2018.

This SSMP update benefits from the City’s recent SSMP audit, (completed in January 2025 and due to the State Water Board on 2/2/2025) and the recent Sewer Master Plan Update (performed on April 1, 2025). This SSMP satisfies new requirements in the 2022 General Order. The City has updated the required elements in the SSMP. For example, the GIS effort to document (map) City assets is now included in the SSMP, including such items as valves, manholes, pipe diameters, and lift/pump stations. The recent effort to evaluate sewer capacity, assess sewer infiltration and inflow (I/I), and lift/pump station capacity (done in the Sewer Master Plan), provided timely information for this SSMP update.

Items found to be missing in the SSMP audit are now included in the update.

The General Order requires regular reporting, something that City performs regularly. The new General Order now requires reporting on “Category 4” spills. “Category 4” spills are spills below 50 gallons. This is now included in the SSMP, although the City has complied with the requirement for some time now. When such spills (or larger) occur, the City usually recovers all spilled material and disinfects the area according to this SSMP and the City Sanitary Sewer Overflow Response Plan. This SSMP and a GIS map of the sewer system will be uploaded into the State Water Boards reporting system, as required by the General Order.

ANALYSIS
The goal of the Sewer System Management Plan is to provide the City a guiding document to properly manage, operate, and maintain all parts of the sanitary sewer system. This updated SSMP will help reduce and prevent sewer spills and overflows as well as mitigate any spills that do occur within the City service area.

SSMP goals reflect performance, safety, levels of service, resource use, and other considerations that the City is committed to operating the sewer system. A good SSMP preventive maintenance program is one component in keeping a system in good repair and preventing excessive infiltration/inflow (I/I), service interruptions, and system failures. A good SSMP can help in protecting the capital investment in the collection system. 218 CONSIDERATION OF RESOLUTION 25-76 APPROVING THE SEWER SYSTEM MANAGEMENT PLAN (SSMP) July 16, 2025

Page 2 ends

Strategic Plan Integration
The SSMP supports “Core Services and Infrastructure” by ensuring the sewer collection system is wellmaintained. It also supports “Climate and Energy Resiliency” by protecting our environment.

Environmental Considerations
The current action is not a project that is subject to CEQA because it is not an activity that may cause either a direct or reasonably foreseeable indirect physical change in the environment. (Pub. Resources Code, § 21065; CEQA Guidelines §§ 15060(c), 15378(a).)
Commission Recommendation
Staff plan to share the SSMP with the Environmental and Utilities Commission at their next regularly scheduled meeting.

Strategic Plan Integration
The SSMP supports “Core Services and Infrastructure” by ensuring the sewer collection system is wellmaintained. It also supports “Climate and Energy Resiliency” by protecting our environment.

Alternatives
The City Council may choose among the following alternatives:
1) Approve the recommended actions as stated above.
2) Amend the recommended actions.
3) Decline to approve the recommended actions or cancel the project.

Staff recommend Alternative 1 to approve the SSMP Update to ensure the report is filed with the State of California by the August 2, 2025, deadline.

Coordination and Review
This report was prepared by the Capital Projects Department in coordination with and review by the Public Works Department.

Budget/Cost Impact
The $200,000 budget for the update is in the City’s current Capital Improvement Program (CIP) as CIP 30000:

Sewer System Management Plan Update and was taken from the Sewer Enterprise Fund 501-9410. The future budget impacts to the updated state sewer collection system requirements will be accounted for in the Sewer Rate Study process.

ATTACHMENTS

1. Vicinity Map

2. Resolution 25-76

3. Sewer System Management Plan (SSMP) Update
219
220
Attachment 2
RESOLUTION 25-76

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF WEST SACRAMENTO APPROVING THE CITY’S SEWER SYSTEM MANAGEMENT PLAN UPDATE WHEREAS, the California State Water Resources Control Board (SWRCB) has adopted Statewide General Water Discharge Requirements Order No. WQ-2022-103-DWQ (hereinafter WDR Order) for all publicly owned sanitary sewer collection systems; and WHEREAS, the WDR Order requires that all publicly owned collection systems greater than one mile in length take all feasible steps to prevent sewage spills and overflows, develop a Sewer System Management Plan (SSMP), and comply with WDR Order reporting requirements; and
WHEREAS, the City of West Sacramento is subject to the requirements of the WDR Order; and
WHEREAS, the City of West Sacramento adopted Resolutions 09-53 and 18-22 approving previous versions of the Sewer System Management Plan; and WHEREAS, the WDR Order requires that all reports shall be signed and certified by a person designated by the City as a ranking elected official, or by a duly authorized person of that person.

NOW, THEREFORE, BE IT RESOLVED, that the City Council of the City of West Sacramento does hereby:

1. Approve the Sewer System Management Plan Update; and

2. Authorize the City Manager, or their designee, to sign and certify all reports required by the WDR Order.

PASSED AND ADOPTED this day of July 16th, 2025, by the following vote:

AYES:

NOES:

ABSENT:

ABSTAIN:

Martha Guerrero, Mayor
ATTEST:

Jennifer Cusmir, City Clerk
221
City of West Sacramento

SEWER SYSTEM MANAGEMENT

PLAN UPDATE
June 23, 2025
Prepared for the City of West Sacramento
222
June 2025 i Sewer System Management Plan
City of West Sacramento
Table of Contents
CITY OF WEST SACRAMENTO 2025 SEWER SYSTEM MANAGEMENT PLAN UPDATE 1 SEWER SYSTEM MANAGEMENT PLAN GOALS AND INTRODUCTION ............................................................................ 1-1

1.1 Regulatory Context ...................................................................................................................................... 1-1

1.2 Sewer System Management Plan Update Schedule................................................................................. 1-3

1.3 Sewer System Asset Overview................................................................................................................... 1-6

1.4 Implementation............................................................................................................................................. 1-8

1.5 Resilience..................................................................................................................................................... 1-8

1.6 References................................................................................................................................................... 1-8 2 ORGANIZATION ........................................................................................................................................................ 2-1

2.1 Organizational Structure.............................................................................................................................. 2-1

2.2 Responsibilities and Contacts ..................................................................................................................... 2-2

2.3 Responsibility for SSMP Implementation and Maintenance ...................................................................... 2-3

2.4 Spill Reporting Chain of Communication .................................................................................................... 2-3

2.5 Implementation............................................................................................................................................. 2-7

2.6 Resilience..................................................................................................................................................... 2-7

2.7 References................................................................................................................................................... 2-7 3 LEGAL AUTHORITY................................................................................................................................................... 3-1

3.1 Municipal Code ............................................................................................................................................ 3-1

3.2 Cooperation, collaboration and Easement Agreements for Accessibility .................................................. 3-2

3.3 Implementation............................................................................................................................................. 3-3

3.4 Resilience..................................................................................................................................................... 3-3

3.5 References................................................................................................................................................... 3-3 4 OPERATION AND MAINTENANCE PROGRAM............................................................................................................... 4-1

4.1 Updated Map of Sewer System .................................................................................................................. 4-1

4.2 Preventive operation and Maintenance Activities....................................................................................... 4-3

4.2.1 Cleaning and Maintaining Sewer System Components................................................................... 4-3

4.2.2 Gravity Mains ..................................................................................................................................... 4-5

4.2.3 Force Mains........................................................................................................................................ 4-6

4.2.4 Private Sewer Laterals..................................................................................................................... 4-10

4.2.5 Rehabilitation and Replacement Program...................................................................................... 4-10

4.3 Training....................................................................................................................................................... 4-10

4.4 Equipment Inventory.................................................................................................................................. 4-11

4.4.1 Contingency Equipment and Replacement Inventories ................................................................. 4-11

4.5 Implementation........................................................................................................................................... 4-11

4.6 Resilience................................................................................................................................................... 4-11

4.7 References................................................................................................................................................. 4-11 5 DESIGN AND PERFORMANCE PROVISIONS................................................................................................................. 5-1

5.1 Updated Design Criteria and Construction Standards and Specificaions ................................................. 5-1

5.1.1 General............................................................................................................................................... 5-1

5.1.2 2024 City Sewer Master Plan Update............................................................................................... 5-1

5.1.3 Lift Stations......................................................................................................................................... 5-2 223
Table of Contents
June 2025 ii Sewer System Management Plan
City of West Sacramento

5.1.4 City Sewer System – Authorized Pipe Materials .............................................................................. 5-2

5.1.5 Private Sewer Systems and Private Laterals.................................................................................... 5-2

5.2 Procedures and Standards.......................................................................................................................... 5-2

5.2.1 New and Rehabilitated Gravity Sewers ............................................................................................ 5-2

5.2.2 Design ................................................................................................................................................ 5-3

5.2.3 New and Rehabilitated Manholes ..................................................................................................... 5-3

5.2.4 New and Rehabilitated Lift Stations .................................................................................................. 5-3

5.3 Implementation............................................................................................................................................. 5-3

5.4 References................................................................................................................................................... 5-4 6 SPILL EMERGENCY RESPONSE PLAN........................................................................................................................ 6-1

6.1 Purpose........................................................................................................................................................ 6-2

6.2 Policy............................................................................................................................................................ 6-2

6.3 Goals ............................................................................................................................................................ 6-2

6.4 Spill Detection and Notification.................................................................................................................... 6-2

6.4.1 Public Observation............................................................................................................................. 6-3

6.5 City Staff Observation.................................................................................................................................. 6-5

6.6 Contractor Observation................................................................................................................................ 6-5

6.7 Spill RESPONSE PROCEDURES ............................................................................................................. 6-5

6.7.1 Sewer Overflow/Backup Response Summary ................................................................................. 6-5

6.7.2 First Responder Priorities .................................................................................................................. 6-6

6.7.3 Safety.................................................................................................................................................. 6-7

6.7.4 Initial Response.................................................................................................................................. 6-7

6.7.5 Initiate Spill Containment Measures.................................................................................................. 6-8

6.7.6 Restore Flow...................................................................................................................................... 6-8

6.7.7 Equipment.......................................................................................................................................... 6-9

6.8 Recovery and Cleanup................................................................................................................................ 6-9

6.8.1 Estimate the Volume of Spilled Sewage........................................................................................... 6-9

6.8.2 Recovery of Spilled Sewage.............................................................................................................. 6-9

6.8.3 Clean-up and Disinfection................................................................................................................ 6-10

6.9 Notification.................................................................................................................................................. 6-11

6.9.1 Public Notification............................................................................................................................. 6-11

6.9.2 Downstream Notification.................................................................................................................. 6-11

6.10 Water Quality.............................................................................................................................................. 6-11

6.10.1 Waters of the State ..................................................................................................................... 6-11

6.10.2 Water Quality Sampling and Testing.......................................................................................... 6-12

6.10.3 Water Quality Monitoring Plan.................................................................................................... 6-12

6.10.4 Spill Technical Report................................................................................................................. 6-13

6.11 Sewer Backup into/onto Private Property Claims Handling Procedure................................................... 6-14

6.12 Notification, Reporting, Monitoring and Record and Recordkeeping Requirements............................... 6-14

6.12.1 Regulator Required Notifications................................................................................................ 6-14

6.12.2 Complaint Records ..................................................................................................................... 6-16

6.13 Post Spill Event Debriefing ........................................................................................................................ 6-17

6.14 Failure Analysis Investigation .................................................................................................................... 6-17

6.15 Spill Response Training............................................................................................................................. 6-18

6.16 Initial and Annual Refresher Training........................................................................................................ 6-18

6.16.1 Spill Response Drills................................................................................................................... 6-18

6.16.2 Spill Training Record Keeping.................................................................................................... 6-19

6.16.3 Contractors Working on City Sewer Facilities............................................................................ 6-19 224
Table of Contents
June 2025 iii Sewer System Management Plan
City of West Sacramento

6.17 Authority ..................................................................................................................................................... 6-19

6.18 Implementation........................................................................................................................................... 6-19

6.19 Resilience................................................................................................................................................... 6-19

6.20 References................................................................................................................................................. 6-20 7 SEWER PIPE BLOCKAGE CONTROL PROGRAM.......................................................................................................... 7-1

7.1 Fog Source Control Program – Reviews & Inspections............................................................................. 7-1

7.1.1 Public Education/Outreach................................................................................................................ 7-1

7.1.2 A Plan and Schedule for the Disposal of Pipe-Blocking Substances .............................................. 7-2

7.1.3 The Legal Authority............................................................................................................................ 7-2

7.1.4 Requirements to Install Grease Removal Devices........................................................................... 7-2

7.1.5 Inspections ......................................................................................................................................... 7-2

7.1.6 An Identification of Sanitary Sewer System Sections....................................................................... 7-2

7.2 Implementation............................................................................................................................................. 7-2

7.3 Resilience..................................................................................................................................................... 7-3

7.4 References................................................................................................................................................... 7-3 8 SYSTEM EVALUATION,CAPACITY ASSURANCE AND CAPITAL IMPROVEMENTS............................................................ 8-1

8.1 System Evaluation and Condition Assessment.......................................................................................... 8-1

8.2 Capacity Assessment and Design Criteria.................................................................................................. 8-1

8.3 Prioritization or Corrective Action ................................................................................................................ 8-2

8.4 Capital Improvement Plan ........................................................................................................................... 8-2

8.5 Implementation............................................................................................................................................. 8-3

8.6 Resilience..................................................................................................................................................... 8-3

8.7 References................................................................................................................................................... 8-3 9 MONITORING,MEASUREMENT AND PROGRAM........................................................................................................... 9-1

9.1 Performance Measures ............................................................................................................................... 9-1

9.1.1 Baseline Performance ....................................................................................................................... 9-2

9.2 Implementation............................................................................................................................................. 9-2

9.3 Resilience..................................................................................................................................................... 9-2

9.4 References................................................................................................................................................... 9-3 10 INTERNAL AUDITS .................................................................................................................................................. 10-1

10.1 Audits.......................................................................................................................................................... 10-1

10.2 SSMP Updates .......................................................................................................................................... 10-2

10.3 Resilience................................................................................................................................................... 10-2 11 COMMUNICATION PROGRAM................................................................................................................................... 11-1

11.1 Communication During SSMO Development and Implementation ......................................................... 11-1

11.2 Communication with Regional San........................................................................................................... 11-2

11.3 Implementation........................................................................................................................................... 11-2

11.4 Resilience................................................................................................................................................... 11-2

11.5 References................................................................................................................................................. 11-2

FIGURES
Figure 1-1 City of West Sacramento Zoning.......................................................................................................... 1-4 Figure 1-2 City of West Sacramento Collection System...................................................................................... 1-9 Figure 1-3 City of West Sacramento Collection System...................................................................................... 1-9 225
Table of Contents
June 2025 iv Sewer System Management Plan
City of West Sacramento
Figure 2-1 City of West Sacramento Public Works Communication lines for SSMP...................................... 2-4 Figure 4-1 Storm Drain Network Map...................................................................................................................... 4-2 Figure 4-2 City of West Sacramento Sewer Cleaning Program.......................................................................... 4-5 Figure 6-1 Overview of Receiving a Sewer Overflow or Backup Report Procedure........................................ 6-4 Figure 6-2 Overview of Spill and Backup Response Procedure......................................................................... 6-6 Figure 9-1 Number of Spills (SSOs) per 100 Miles................................................................................................ 9-2 TABLES
Table 1-1 City of West Sacramento Zoning Codes and Areal Coverage........................................................... 1-5 Table 2-1 Responsible City Staff for SSMP and Collections System Elements............................................... 2-2 Table 2-2 Roles and Responsibilities Defined ...................................................................................................... 2-5 Table 2-3 Chain of Command for Spills ................................................................................................................. 2-6 Table 3-1 General Waste Discharge Requirements Legal Authority ................................................................. 3-2 Table 4-1 Force Main Detail Associated with Lift Stations................................................................................. 4-6 Table 4-2 Lift Stations Descriptions ....................................................................................................................... 4-8 Table 4-3 Lift Station Maintenance Schedule........................................................................................................ 4-9 Table 6-1 Septage Haulers....................................................................................................................................... 6-8 Table 6-2 Downstream Water Purveyors ............................................................................................................. 6-11 Table 6-3 Regulator Required Actions................................................................................................................. 6-15

APPENDICES
Appendix A - sanitary Sewer Map book
Appendix B - Sanitary sewer overflow response plan
Appendix C - 2025 Sewer system management plan audit
Appendix D - Annual SSMP Change log and Tracking sheet
Appendix E - Operating Fund History
Appendix F - 2024 Sewer master plan
226
June 2025 v Sewer System Management Plan
City of West Sacramento
Engineer’s Seals and Signatures
I certify under penalty of law that I have personally examined and am familiar with the information submitted in this document and all attachments and that, based on my knowledge and on my inquiry of those individuals immediately responsible for obtaining the information, I believe that the information is true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment.

Todd M.Thompson 6/23/2025
My license renewal date is 06/30/26
Contributors to City of West Sacramento
Kjeldsen, Sinnock, & Neudeck, Inc.
227
June 2025 vi Sewer System Management Plan
City of West Sacramento

TABLE OF DEFINITIONS, ACRONYMS, AND ABBREVIATIONS
Abbreviation Definition
Backup Sanitary Sewer Backup
Refers to a wastewater backup into a building and/or on private property caused by blockages or flow conditions within the publicly owned portion of a sanitary sewer system.

BMP Best Management Practice:

Refers to the procedures employed in commercial
kitchens to minimize the quantity of grease that is
discharged to the sanitary sewer system. Examples
include scraping food scraps into a garbage can and
dry wiping dishes and utensils prior to washing.

Building Lateral see Private Sewer Lateral
CalOES California Office of Emergency Services
CCTV Closed-Circuit Television
Refers to the process and equipment that is used to internally inspect the condition of gravity sewers.

CVRWQCB Central Valley Regional Water Quality Control Board Backup CIP Capital Improvement Program
Refers to the document that identifies future capital improvements to the City’s sanitary sewer system
City City of West Sacramento
CIQWS California Integrated Water Quality System
Refers to the State Water Resources Control Board
online electronic reporting system that is used to
report spills, certify completion of the SSMP, and
provide information on the sanitary sewer system.

CMMS Computerized Maintenance Management System
Collection System
Refers to the system of pipes or sewer lines used to convey wastewater to a treatment facility
CWEA California Water Environment Association
CY Calendar Year
DIP Ductile Iron Pipe
DS Data Submitters
FOG Fats, Oils, and Grease
Refers to fats, oils, and grease typically associated
with food preparation and cooking activities that can
cause blockages in the sanitary sewer system.

FY Fiscal Year
Refers to the 12-month periods beginning July 1st and ending June 30th.

FSE Food Service Establishment
228
Table of Definitions, Acronyms, and Abbreviations
June 2025 vii Sewer System Management Plan
City of West Sacramento
Abbreviation Definition
Refers to commercial or industrial facilities where food is handled/prepared/served that discharge to the sanitary sewer system GWDR or WDR General Waste Discharge Requirements
Refers to the State Water Resources Control Board Order No. 2022-0103-DWQ, Statewide General Waste Discharge Requirements for Sanitary Sewer Systems, dated Dec. 6, 2022
GIS Geographical Information System
Refers to the City’s system that is used to capture,
store, analyze, and manage geospatial data
associated with the City’s sanitary sewer system
assets.

GRD Grease Removal Device
Refers to grease traps and grease interceptors that
are installed to remove FOG from the wastewater flow
at food service establishments.

Greenbook The “Greenbook”: Standard Specification for Public Works Construction
Refers 2015 or most current version
I/I Infiltration and Inflow
Refers to water that enters the sanitary sewer system
from storm water and groundwater. Infiltration enters
through defects in the sanitary sewer system after
flowing through the soil. Inflow enters the sanitary
sewer without flowing through the soil. Typical points
of inflow are holes in manhole lids and direct
connections to the sanitary sewer (e.g. storm drains,
area drains, and roof leaders).

Lateral Refers to the piping that extends from the end of the building drain to the public sewer which includes the connection to the public sewer.

LNWI Lower Northwest Interceptor
Refers to the 120-inch diameter gravity pipeline at
the point of the City’s connection that conveys all
flows from the City’s collection system to the
WWTP.

LS Lift Station – see Pump Station
MH Manhole
Refers to an engineered structure that is intended to
provide access to a sanitary sewer for maintenance
and inspection.

Mainline Sewer Refers to City wastewater collection system piping that is not a private lateral connection to a user.

Maintenance Hole see Manhole
229
Table of Definitions, Acronyms, and Abbreviations
June 2025 viii Sewer System Management Plan
City of West Sacramento
Abbreviation Definition
MMPM Monitoring, Measurement, and Plan Modifications
MRP Monitoring and Reporting Program
O&M Operations and Maintenance
PACP Pipeline Assessment and Certification Program
Refers to the NASSCO certification program that is used for the evaluation and condition assessment of sewer lines and
appurtenances from closed circuit televising of the lines and appurtenances.

PM Preventive Maintenance
Refers to maintenance activities intended to prevent
failures of the sanitary sewer system facilities (e.g.
cleaning, CCTV, repair, etc.).

PLSD Private Lateral Sewage Discharges
Refers to sewage discharges that are caused by blockages or other problems within a privately-owned lateral, collection system, or other private sewer assets that are tributary to the City’s collection system Private Sewer
Lateral Refers to the portion of a private property’s building sewer as defined by the plumbing code.

PS Pump Station
Refers to a facility that transmits and lifts sewage
into the City gravity sanitary sewer collection system
PVC Polyvinylchloride Pipe
PW Public Works
Spill Sanitary Sewer Overflow (SSO)
Refers to any overflow, spill, release, discharge or diversion of untreated or partially treated wastewater from a sanitary sewer system. spills include:
(a) Overflows or releases of untreated or partially treated wastewater that reach waters of the United States;
(b) Overflows or releases of untreated or partially treated wastewater that do not reach waters of the United States; and
(c) Wastewater backups into buildings and on private property that are caused by blockages or flow conditions within the publicly owned portion of a sanitary sewer system
(d) Refers to any overflow, spill, release, discharge or diversion of untreated or partially treated wastewater from a sanitary sewer system. spills include:

Spill Category 1 Refers to a discharge of untreated or partially treated wastewater of any volume resulting from a sanitary sewer system failure or flow condition that either:
• Reaches surface water and/or drainage channel tributary to a surface water; or
230
Table of Definitions, Acronyms, and Abbreviations
June 2025 ix Sewer System Management Plan
City of West Sacramento
Abbreviation Definition
• Reaches a Municipal Separate Storm Sewer System (MS4) and is not fully captured and returned to the sanitary sewer system or otherwise captured and disposed of properly.

Spill Category 2 Refers to a discharge of untreated or partially treated wastewater greater than or equal to 1,000 gallons resulting from a sanitary sewer system failure or flow condition that either:
• Does not reach surface water, a drainage channel, or an MS4, or
• The entire spill discharges to the storm drain system and is fully recovered and disposed of properly
Spill Category 3 Refers to discharges of untreated or partially treated wastewater of a volume less than 1,000 gallons but greater than 50 gallons resulting from a sanitary sewer system failure or flow condition that does not reach surface water
Spill Category 4 Refers to discharges of untreated or partially treated wastewater of a volume less than 50 gallons resulting from a sanitary sewer system failure or flow condition that does not reach surface water Satellite Agency Refers to a service area of another government agency that discharges sewage to the City of West Sacramento collection system and depending upon size of the collection system be enrolled under the waste discharge regulations.

SSMP Sewer System Management Plan
SSORP Sanitary Sewer Overflow Response Plan
SOP Standard Operating Procedures
Refers to written procedures that pertain to specific activities employed in the operation and maintenance of the Sanitary Sewer System
SWRCB State Water Resources Control Board
Refers to the California Environmental Protection Agency, State Water Resources Control Board.

Note: The State Board is a separate entity from the Central Valley Regional Water Quality Control Board, although the two agencies are closely connected
SCADA Supervisory Control and Data Acquisition
Refers to the system that is employed by the City to
monitor the performance of its lift stations and to notify the operating staff when there is an alarm condition
that requires attention.

SECAP System Evaluation and Capacity Assurance Plan
Water of the State Refers to “any surface water or groundwater, including saline waters, within the boundaries of the state.” (California Water Code § 13050(e)).

WQMP Water Quality Monitoring Plan
Refers to the plan required by the SWRCB for the
monitoring and testing of spills greater than 50,000
231
Table of Definitions, Acronyms, and Abbreviations
June 2025 x Sewer System Management Plan
City of West Sacramento
Abbreviation Definition
gallons reaching waters of the State or of the United
States as defined in the WDR.

WWTP Wastewater Treatment Plant
Refers to the Sacramento Regional Wastewater
Treatment Plant operated by Sacramento Regional
County Sanitation District, which provides treatment
for the Cities of Sacramento, Folsom, and West
Sacramento, the communities of Courtland and
Walnut Grave, and the Sacramento Area Sewer
District.
232
June 2025 1-1 Sewer System Management Plan
City of West Sacramento
Element 1
1 Sewer System Management Plan Goals and Introduction
This is the Sewer System Management Plan (SSMP) for the City of West Sacramento (City). The goals and intent of this plan are to document and improve upon the work this City does to properly operate and maintain its sanitary sewer system. By having this SSMP, the third update which the City has adopted, the City is showing its commitment to reducing and preventing spills and mitigating spills that could not be stopped.

1.1 Regulatory Context
The City owns and operates a sanitary sewer system for the benefit of its citizens, businesses, and commercial and industrial customers. Zoning is shown in Figure 1-1 and Table 1-1. For the protection of those formerly mentioned, the protection of the environment, and for the sake of protecting the sewer system infrastructure, the City implements an operation and maintenance program that is supported by the City budget, City Council, City Department of Public Works, the City’s Environmental Services Division, and community at large.

The City has codified requirements in their municipal code to provide rules and regulations for the use, design and construction of sanitary sewer facilities within the City. Qualified professionals on City staff and contractors hired by the City perform the work to oversee the construction, use, and maintenance of the sewer system.

The City developed this SSMP and applied for coverage under the Statewide Waste Discharge Requirements General Order for Sanitary Sewer Systems (WQ 2022-0103-DWQ). The General Order regulates sanitary sewer systems designed to convey sewage including, pipes, valves, pump stations, manholes, siphons, wet wells, diversion structures and/or other pertinent infrastructure. This is important because compliance with the General Order requires good management practices that result in protecting citizens, businesses and the environment.

As the centerpiece for compliance with the General Order, this SSMP update is the City’s documentation of it’s commitment to maintaining a safe and effective SSMP. This is the third SSMP update. The original SSMP was adopted in 2008, revised in 2015, and revised again in 2018. The City’s audit in January 2025 (due 2/2/2025) and the recent Sewer Master Plan support this SSMP update. This updated SSMP (due 8/2/2025) continues to guide the City to:
• Properly manage, operate, and maintain the collection system. • Minimize the frequency of sanitary sewer spills
• Mitigate the impact of spills.
• Maintain a list of team members that have roles associated with maintaining the sanitary sewers.

GO SSMP Element 1.1.

The Plan Introduction section must provide a general description of the local sewer system management program and discuss Plan implementation and updates.
233
Element 1 Sewer System Management Plan Goals and Introduction June 2025 1-2 Sewer System Management Plan
City of West Sacramento
• Properly manage, operate, and maintain all portions of the wastewater collection system to minimize spills.
• Provide adequate capacity to convey peak wastewater flows associated with the design storm event. • Reduce the number of spills and achieve the greatest reasonable reduction in spills. • Eliminate orminimize preventable spills.
• Minimize and mitigate the adverse impacts of spills that may occur despite best efforts. • Meet all applicable regulatory notification and reporting requirements. • Measure progress through performance measures so the plan can be adjusted as needed. • Protect public health and safety, and the environment. • Prevent unnecessary property damage.
• Provide a safe work environment for employees and contractors. • Effectively identify and remedy design, construction, and operational deficiencies. • Perform all operation and maintenance activities in a safe manner. • Prevents adverse impacts to surface waters and their beneficial uses. • Ensure corrective action is taken in a timely manner. • Ensure compliance with current regulatory requirements. • Document and define procedures to address spill prevention and response. • Prepare for emergencies.
• Be a part of the community and be a responsive public agency. • Involve employees in the strategic planning process for the collection system. • Effectively plan system expansion to meet the capacity needs of the Enrollee. • Set high, yet achievable standards for the construction of new infrastructure. • Cost effectivelyminimizes infiltration/ inflow (“I/I”); • Maintain and improve the condition and performance of the Enrollee’s wastewater collection system. • Understand the condition of and maintain infrastructure to maximize the life of the collection system. • Properly operate and maintain the collection system to minimize financial impacts on customers. • Adhere to the components of the SSMP.
• Be available and responsive to the needs of the public and work cooperatively with local, state, and federal agencies to reduce, mitigate the impacts of, and properly report spills. • Identify, prioritize, and continuously renew and replace sewer system facilities to maintain reliability. • Implement regular, proactive maintenance of the system to remove roots, debris, and FOG in areas prone to blockages that may cause sewer backups or spills. • Uphold high standards and specifications on newly constructed and/or rehabilitated public and private sewers.
234
Element 1 Sewer System Management Plan Goals and Introduction June 2025 1-3 Sewer System Management Plan
City of West Sacramento

1.2 Sewer System Management Plan Update Schedule
The City Will update this manual as the need arises outside the formal regulatory deadlines: Such updates will occur when:
• Key personnel changes,
• Reporting process changes,
• In reaction to an audit,
• Any action needed to amend the 11 required elements.

The City views the SSMP as a living document needing periodic reconsideration, as required by the General Order. In this revised SSMP, the list of team members has been updated, as well as all the 11 elements. This update benefits from the recent SSMP Audit that occurred in January 2025 (Appendix C) and a recent Sewer Master Plan conducted in 2024 (Appendix F). The audit recommendations were used to guide this update and can be found in Appendix C.

The last audit and this SSMP are the beginning of the next SSMP six-year cycle. At a minimum, the schedule going forward for the coming cycle is estimated as follows:
• Annual Report/SSORP Review February 1, 2026
• Annual Report/ SSORP Review February 1, 2027
• 3-year audit: August 2, 2028
• Annual Report/ SSORP Review February 1, 2028
• Next SSMP Minor Update February 1, 2028
• Annual Report/ SSORP Review February 1, 2029
• Annual Report/ SSORP Review February 1, 2030
• 3-year audit: August 2, 2031
• Annual Report/ SSORP Review February 1, 2031
• 6-year SSMP revision: August 2, 2031
Updates, audits and modifications can be done more frequently, depending upon need and circumstances. The above dates are recommended as the minimum for keeping the SSMP a living document.

Internal audits are not required to be exhaustive. Instead, they are intended as a light review to incorporate staffing, equipment, and other changes that have occurred since the last audit required by the General Order. The result of those internal audits is a minor SSMP update.

GO SSMP Element 1.2.

The Plan Introduction section must include a schedule for the Enrollee to update the Plan, including the schedule for conducting internal audits. The schedule must include milestones for incorporation of activities addressing prevention of sewer spills
235
Element 1 Sewer System Management Plan Goals and Introduction June 2025 1-4 Sewer System Management Plan
City of West Sacramento
Figure 1-1
City of West Sacramento Zoning
236
Element 1 Sewer System Management Plan Goals and Introduction June 2025 1-5 Sewer System Management Plan
City of West Sacramento
Table 1-1
City of West Sacramento Zoning Codes and Areal Coverage 237
Element 1 Sewer System Management Plan Goals and Introduction June 2025 1-6 Sewer System Management Plan
City of West Sacramento

1.3 Sewer System Asset Overview
The City encompasses a total area of 14,722 acres, approximately 23 square miles, with about 1.4 square miles covered by water. Located in Yolo County, California, the City is bordered by the City of Sacramento to the north and east, separated by the Sacramento River, which also serves as the County line. West and south of the City are unincorporated agricultural lands, with the western boundary being the Yolo Bypass Wildlife Area.

West Sacramento’s population in 2020 was estimated at 53,915, with projections suggesting a rise to 79,478 by 2035. The City's land use is guided by the 2015-2035 General Plan, with future developments expected to concentrate in Southport and riverfront areas. The City's growth forecasts predict an annual population growth rate of 2.5%, leading to significant new housing and non-residential developments. The general Plan also outlines the City's ability to add up to 30,916 new housing units and 23.6 million square feet of non-residential space at full buildout, primarily focused in specific plan areas like the Washington and Bridge Districts The City’s wastewater collection system (please see Figure 1-2) includes approximately 164 miles of gravity sewers with sizes ranging from 4 to 30 inches in diameter, 30 miles of pressure pipelines, 9 pump stations, and 5 lift stations. It serves nearly all areas within the City limits, except for a small southeastern rural area relying on septic systems. The portion of the sewer system south of the Deep-Water Channel is newer, with the system north of the Deep-Water Channel being older. The system directs wastewater to the Lower Northwest Interceptor (LNWI), a 120-inch pipeline that ultimately leads to the Sacramento Regional Wastewater Treatment Plant. The City does maintain the lower sewer laterals and provides maintenance and repair of sewer laterals, installing cleanouts when needed.

GO SSMP Element 1.3.

The Plan Introduction section must provide a description of the Enrollee-owned assets and service area, including but not limited to:
• Location, including county(ies);
• Service area boundary;
• Population and community served;
• System size, including total length in miles, length of gravity mainlines, length of pressurized (force) mains, and number of pump stations and siphons;
• Structures diverting stormwater to the sewer system;
• Data management systems.
• Sewer system ownership and operation responsibilities between Enrollee and private entities for upper and lower sewer laterals;
• Estimated number or percent of residential, commercial, and industrial service connections; and • Unique service boundary conditions and challenge(s).

Additionally, the Plan Introduction section must provide reference to the Enrollee’s up to-date map of its sanitary sewer system, as required in section 4.1 (Updated Map of Sanitary Sewer System) of this Attachment 238
Element 1 Sewer System Management Plan Goals and Introduction June 2025 1-7 Sewer System Management Plan
City of West Sacramento
Of the collection system gravity mains, 74.9% are 8-inch diameter or smaller. The primary sewer materials are vitrified clay pipes (VCP) and polyvinylchloride (PVC) pipes, with plastic materials used for newer sewer construction and rehabilitation. The earliest installation date of gravity mains in the system database is 1945, although some pipes with unknown dates may predate 1945. Approximately 26% of gravity mains were constructed in the 1950s or earlier, with approximately 38% being constructed between the 1960s and 1990s, and over 35% being constructed in the 2000s or later. Force mains in the system are composed primarily of ductile iron pipes (DIP) and PVC pipes.

Recent updates to the City’s and Computerized Maintenance Management System have helped provide detailed information about the infrastructure, allowing more accurate assessments of system components, including pipe diameters, materials, and installation years. Pump station asset information and work order history is currently managed by the City using a Computerized Maintenance Management System (CMMS). The City has a list of the IDs of assets currently included in CMMS, making tracking and accounting of them relatively easy. Pump station asset information and work order history is currently managed by the city using a Computerized Maintenance Management System (CMMS).

The City is in the process of improving its Geographic Information System (GIS) inventory of the collection system linear assets and maintenance holes. Its GIS-based registry includes asset information such as material, diameter, length, installation date, and a unique numerical identifier. In recent years, assets in the northern portion of the City have been surveyed and added to the registry. The City’s GIS is divided into Geospatial and Schematic portions and is shown in the City of West Sacramento Sewer Map Book (Appendix A).

The Geospatial portion of the GIS generally contains detailed hydraulic attributes (pipeline diameter and invert elevations) and location information for the collection system assets. The Schematic GIS contains general asset location information, such as pipe material and diameter, but does not include all other GIS attributes. The City’s Geospatial geodatabase of sewer GIS data was expanded to include data that was previously only available in the Schematic GIS dataset. The City completed an update in July 2023 that added a significant number of pipes to the Geospatial geodatabase. The City continues to update the GIS database. Many of the City’s gravity mains are not included in the Geospatial geodatabase. Currently, pipes in the Schematic GIS are merged with the Geospatial GIS layer. The Schematic GIS “year installed” attribute was estimated based on an approximate year of the neighboring development and installation date of nearby pipes with known installation dates. The City uses a GIS Correction form for field staff that notice locations that do not match the GIS mapping effort. This level of QA/QC grounds the data confirmed on the GIS map.

The City of West Sacramento is the responsible entity for all stormwater-related conveyances. All internal drainage within the City is collected through gravity storm drains and drainage canals and conveyed by a series of pump stations into either the Sacramento River, the Deep Water Shipping Channel (DWSC), or the Yolo Bypass. The Storm Drain Network Map for the City of West Sacramento is included in Element 4, as required. 239
Element 1 Sewer System Management Plan Goals and Introduction June 2025 1-8 Sewer System Management Plan
City of West Sacramento

1.4 Implementation
Implementation Requirements for Element 1
Annual Report/SSMP Review February 1, 2026
Annual Report/ SSMP Review February 1, 2026
3-year audit: August 2, 2028
Annual Report/ SSMP Review February 1, 2026
Next SSMP Minor Update February 1, 2026
Annual Report/ SSMP Review February 1, 2026
Annual Report/ SSMP Review February 1, 2026
3-year audit: August 2, 2028
Annual Report/ SSMP Review February 1, 2026
6-year SSMP revision: August 2, 2028

1.5 Resilience
Element 1 fosters resilience by documenting the program goals, listing dates necessary to keep this SSSP a living document, and committing to further the GIS documentation of system assets.

1.6 References
• City of West Sacramento Sewer Master Plan Update, City of West Sacramento and Black & Veatch 2024 • Sewer System Management Plan (2018 Update), City of West Sacramento and West Yost Associates • Sewer System Management Plan Audit for the 3-Year Audit Period Ending August 2, 2024 240
Element 1 Sewer System Management Plan Goals and Introduction June 2025 1-9 Sewer System Management Plan
City of West Sacramento
Figure 1-2
City of West Sacramento Collection System
241
June 2025 2-1 Sewer System Management Plan
City of West Sacramento
Element 2
2 Organization

2.1 Organizational Structure
The organization, management, operation, and maintenance of the City’s SSMP and wastewater collection system is shown in Table 2-1 by SSMP Element. The names, titles, and contact information are given below in Table 2-1.

GO SSMP Element 2.

The Plan must identify organizational staffing responsible and integral for implementing the local Sewer System Management Plan through an organization chart or similar narrative documentation that includes:
• The name of the Legally Responsible Official as required in section 5.1 (Designation of a Legally Responsible Official) of this General Order;
• The position titles, telephone numbers, and email addresses for management, administrative, and maintenance positions responsible for implementing specific Sewer System Management Plan elements;
• Organizational lines of authority; and
• Chain of communication for reporting spills from receipt of complaint or other information, including the person responsible for reporting spills to the State and Regional Water Boards and other agencies, as applicable. (For example, county health officer, county environmental health agency, and State Office of Emergency Services.)
242
Element 2 Organization
June 2025 2-2 Sewer System Management Plan
City of West Sacramento
Table 2-1
Responsible City Staff for SSMP and Collections System Elements

ELEMENT ELEMENT NAME RESPONSIBLE

CITY OFFICIAL RESPONSIBLE PERSON
1 Goal and Introduction Public Works Director
(Acting) Ariana Adame
2 Organization
(Legally Responsible Official)
Utilities Maintenance
Superintendent
Robert Santos
LRO/DS
3 Legal Authority Public Works Director
(Acting) Ariana Adame
4 Operation and Maintenance
Program
Utilities Maintenance
Superintendent
Robert Santos
LRO/DS
5 Design and Performance
Provisions City Engineer Mark Collier
6 Spill Emergency Response
Plan
Utilities Maintenance
Superintendent
Robert Santos
LRO/DS
7 Sewer Pipe Blockage Control
Program
Utilities Maintenance
Superintendent
Robert Santos
LRO/DS
8 System Evaluation, Capacity
Assurance, Capital
Improvements
Senior Civil Engineer Amber Wallace, P.E.
9 Monitoring, Measurement,
Program Modifications
Utilities Maintenance
Superintendent
Robert Santos
LRO/DS
10 Internal Audits Utilities Maintenance
Superintendent
Robert Santos
LRO/DS
11 Communication Program Utilities Maintenance
Superintendent
Robert Santos
LRO/DS
Robert Santos
Utilities Maintenance Superintendent
(916) 617-4845
[email protected]
Amber Wallace, P.E.

Senior Civil Engineer
(916) 617-5327
[email protected]
Ariana Adame
Director of Capitol Projects
(916) 617-4596
[email protected]
Mark Collier
Principal Engineer
(916) 617-4657
[email protected]

2.2 Responsibilities and Contacts
Data Submitters are authorized to submit electronic and written spill reports. Legally Responsible Officials are individuals authorized to enter and certify electronic spill reports and other required submittals on behalf of the City to the SWRCB. As shown in Table 2-1, Robert Santos, the City’s Utility Maintenance Superintendent, is both the Legally Responsible Official (LRO) and Data Submitter (DS) for the wastewater collection system. Other responsibilities for the other SSMP Elements are identified in Table 2-1 along with their roles and responsibilities for the collection system operations.
243
Element 2 Organization
June 2025 2-3 Sewer System Management Plan
City of West Sacramento

2.3 Responsibility for SSMP Implementation and Maintenance The Director of Public Works is charged with the overall responsibility for implementing, periodically auditing, and maintaining the City’s SSMP. He or she may delegate these responsibilities to his or her staff, as shown in Figure2-

1. 2.4 Spill Reporting Chain of Communication
The Spill Reporting Chain of Command follows the Organization Chart shown on Figure 2-1. The Spill Reporting process chain of command and roles and responsibilities are described in detail in Element 6: Sanitary Sewer Overflow Response Plan, and shown in Tables 2-2 and 2-3. 244
Element 2 Organization
June 2025 2-4 Sewer System Management Plan
City of West Sacramento
Figure 2-1
City of West Sacramento Public Works Communication lines for SSMP 245
Element 2 Organization
June 2025 2-5 Sewer System Management Plan
City of West Sacramento
Table 2-2
Roles and Responsibilities Defined
Position Roles and Responsibilities
City Council Establishes policy.

City Manager
Plans, organizes and directs the overall administrative activities and operations of the City. Advises and assists the City Council, represents the City’s interest with other governmental agencies, business interests, and the community.

Director of Public Works
Plans, directs, organizes, coordinates, supervises and reviews the activities of the divisions comprising the Public Works Department. Provides highly responsible professional and technical staff assistance to the City Manager.

Public Works Operations Manager (LRO) Determines whether drinking waters are impacted from the spill. Provides information to PIO/City Manager/Director of Public Works/Director of Community Development. Finalizes/certifies Spill Report.

Utilities Maintenance Superintendent (LRO)
Confirms Category 1 Spills. Directs staff. Updates communication center. Initiates spill electronic report requirements. Provides requested information on spill. Reviews Spill Field Report. Finalizes/certifies Spill Report.

Environmental Services Manager (DS) Coordinates with Yolo County Environmental Health. Directs sampling operations as necessary. Completes electronic spill reports, as needed.

Chief Maintenance Worker
Dispatches response staff. Investigates and assess Spill. Directs response staff. Communicates with City Divisions. spill documentation. Corrects cause of spill. Contains spill. Initiates spill report requirements. Cleans up spills. Updates communication center. Submits spill field report.

On-Call Utility Maintenance Worker
Provides initial response for after-hours calls. Investigates and assess spill. Contacts additional staff for assistance. Corrects cause of spill Contains Spill. Posts warning signs. Cleans up spills. Updates communication center.

Utility Maintenance Worker Investigates and assess Spill. Contacts additional staff for assistance. Corrects cause of spill. Contains spill.

Posts warning signs. Cleans up spills. Updates communication center.

On-Call Treatment Plant Mechanic Operation of sanitary/storm pump stations and SCADA. Updates communication center.

Public Works Clerk or Secretary Receives initial call and dispatch staff for response. Staffs communication center.

Engineering Construction Management Staff Works with contractor on construction-related spills. Updates communication center.

Public Information Officer Issues news release. Notifies media.

West Sacramento Fire Department Provides boat; emergency response.

West Sacramento Police Department Traffic and crowd control. 246
Element 2 Organization
June 2025 2-6 Sewer System Management Plan
City of West Sacramento
Table 2-3
Chain of Command for Spills
Public Works Clerk / Secretary Receive initial call and dispatch staff for response Staff communication center
On-Call Utility Maintenance Worker Provide an initial response for after-hour calls.

Investigate and assess spill
Contact additional staff for assistance
Correct cause
Contain spill
Post signs
Clean-up
Update communication center
Utility Maintenance Worker Investigate and assess spill Contact additional staff for assistance
Correct cause
Contain spill
Post signs
Clean-up
Update communication center
Chief Utility Maintenance Worker Dispatch response staff Investigate and assess spill
Direct response staff
Communicate with City Divisions
Spill documentation
Correct cause
Contain spill
Initiate spill report requirements
Clean-up
Update communication center
Submit spill field report
Engineering Construction Work with contractor on construction related spills Management Staff Update communication center
Utility Maintenance Superintendent Confirm Category 1 spill Direct staff
Update communication center
Staff communication center
Direct staff
Update communication center
On-Call Treatment Plant Mechanic Operation of sanitary/storm pump stations 247
Element 2 Organization
June 2025 2-7 Sewer System Management Plan
City of West Sacramento
SCADA
Update communication center
Public Information Officer (PIO) Issues news release
Media notification
West Sacramento Fire Department Provide boat
Emergency response
West Sacramento Police Department Traffic and crowd control

2.5 Implementation
Implementation Schedule
Update Responsible City Staff for SSMP and
Collections System Elements (Table 2-1) Annually
Update Established Communication Lines
(Figure 2-1) Annually

2.6 Resilience
Resilience is addressed in Element 2 by the updating of the roles, responsibilities, and contacts of the SSMP. This will reinforced every annual modification through the implementation.

2.7 References
• Sanitary Sewer Overflow Response Plan, Public Works Department, City of West Sacramento 248
June 2025 3-1 Sewer System Management Plan
City of West Sacramento
Element 3
3 Legal Authority

3.1 Municipal Code
The City has the legal authority to own and operate its sanitary sewer collection system. The West Sacramento Municipal Code establishes this legal authority and is available online (http://qcode.us/codes/westsacramento/).

That authority is specifically contained within Title 13, Chapter 8 and Chapter 9 of the Municipal Code and addresses the listed sections summarized in the GO and listed in Table 3-1.

GO SSMP Element 3.

The Plan must include copies or an electronic link to the Enrollee’s current sewer system use ordinances, service agreements and/or other legally binding procedures to demonstrate the Enrollee possesses the necessary legal authority to:
• Prevent illicit discharges into its sanitary sewer system from inflow and infiltration (I&I); unauthorized stormwater; chemical dumping; unauthorized debris; roots; fats, oils, and grease; and trash, including rags and other debris that may cause blockages;
• Collaborate with storm sewer agencies to coordinate emergency spill responses, ensure access to storm sewer systems during spill events, and prevent unintentional cross connections of sanitary sewer infrastructure to storm sewer infrastructure;
• Require that sewer system components and connections be properly designed and constructed; • Ensure access for maintenance, inspection, and/or repairs for portions of the service lateral owned and/or operated by the Enrollee;
• Enforce any violation of its sewer ordinances, service agreements, or other legally binding procedures; and
• Obtain easement accessibility agreements for locations requiring sewer system operations and maintenance, as applicable.
249
Element 3 Legal Authority
June 2025 3-2 Sewer System Management Plan
City of West Sacramento
Table 3-1
General Waste Discharge Requirements Legal Authority
Requirement Legal Authority Reference
Prevent illicit discharges into the wastewater
collection system 13.08.050, 13.08.105, 13.09.080
Require that sewers and connections be properly
designed and constructed

13.08.110, 13.08.155
Ensure access for maintenance, inspection, or
repairs for portions of the service lateral owned or
maintained by the City 13.08.170, 13.04.320
Enforce any violation of its sewer ordinances 13.08.595 Authority to inspect grease producing facilities 13.09.400 Require proper installation, testing, and inspection of new and rehabilitated sewers 13.08.135, 13.08.145, 13.08.410 Clearly define City responsibility and policies for
sewer laterals 13.08.140
Limit the discharge of fats, oils, and grease and other debris that may cause blockages

13.09.080
Control I/I from private service laterals 13.09.080, 13.09.160 Requirements to install grease removal devices (such
as traps or interceptors), design standards for the
grease removal devices, maintenance requirements,
Best Management Practices (BMP) requirements,
record keeping and reporting requirements

13.09.090

3.2 Cooperation, collaboration and Easement Agreements for Accessibility The City does not have any tributary or satellite sewer systems connected to its gravity or force main sewer collection system according to the definition of the WDR. So, the City does not need any additional agreements for satellite sewer systems. Similarly, the City owns and operates the storm sewers within the City service area. They, therefore, do not need any agreements for the stormwater conveyance system.

However, the City is a satellite agency to the Sacramento Regional County Sanitation District (Regional San).

Regional San is responsible for operating and maintaining the interceptor sewer system to which the City’s collection systemdischarges to for transport to the regional wastewater treatment plant located southeast of the City near Elk Grove, California. The City is responsible for all collection system facilities up to the point of connection to the interceptor sewer. The City maintains communication with Regional San and the two agencies support emergency response efforts within each other’s systems “to the extent that staff in one agency can help the other agency without jeopardizing the functioning of their own systems” (Wastewater Operating Agreement Between the Sacramento Regional County Sanitation District and the City of West Sacramento) 250
Element 3 Legal Authority
June 2025 3-3 Sewer System Management Plan
City of West Sacramento

3.3 Implementation
Implementation Schedule
Review and confirm that all municipal codes affecting
sewer system design, construction, and maintenance
are up-to-date
Once every three years
Confer with Sacramento Regional County Sanitation
District to ensure contact information in the
Wastewater Operating Agreement is up-to-date.

Once ever year

3.4 Resilience
Element 3 promotes resilience by listing the codes that address important aspects of the program.

3.5 References
• West Sacramento Municipal Code, Title 13, Chapters 8 and 9. • Wastewater Operating Agreement Between the Sacramento Regional County Sanitation District and the City of West Sacramento, 2013.
• SSMP for Sacramento Regional County Sanitation District Interceptor System, January 2014. 251
June 2025 4-1 Sewer System Management Plan
City of West Sacramento
Element 4
4 Operation and Maintenance Program

4.1 Updated Map of Sewer System
The City’s Drafting Division uses computer aided design and drafting (CADD) software to generate and distribute maps of the City’s sewer collection, storm water, and water service areas. Utilitymaintenance staff use thesemaps to locate related infrastructure. The sewer collectionmaps allow utility crews to determine and locate components, sewer force main and gravity flow directions, pump station locations, and collection system service areas, manhole and valve locations, transition structure and manifold locations, and upper and lower lateral connection locations.

The storm water maps (Figure 4-1) allow crews to determine gutter and pipe flow direction, storm water inlet locations, ditch and drain locations, pump station locations and their drainage-shed areas. The sewer collection, storm water, and water servicemaps are in separate binders using a common grid system. This allows for side by side comparison of a specific area that may be impacted by a spill event.

Figure 1-3 shows gravity segments, pressure segments, and the pump stations of the collection system. Appendix A includes a map book of the complete collection system with more detail, such as valves, manholes, and pipe diameters where such information is available in Geographic Information System (GIS). The GIS is still being updated. Please see Element 1-3 for more discussion regarding the GIS program in the City.

GO SSMP Element 4.1.

An up-to-date map(s) of the sanitary sewer system, and procedures for maintaining and providing State and Regional Water Board staff access to the map(s). The map(s) must show gravity line segments and manholes, pumping facilities, pressure pipes and valves, and applicable stormwater conveyance facilities within the sewer system service area boundaries.
252
Element 4 Operation and Maintenance Program
June 2025 4-2 Sewer System Management Plan
City of West Sacramento
Figure 4-1
Storm Drain Network Map
253
Element 4 Operation and Maintenance Program
June 2025 4-3 Sewer System Management Plan
City of West Sacramento

4.2 Preventive operation and Maintenance Activities

4.2.1 CLEANING AND MAINTAINING SEWER SYSTEM COMPONENTS
The scheduling and data collection system for preventive operation and maintenance activities is contained in the City’s sewer system O&M Program. The elements of the City’s sewer system O&M Program include:
• Correctivemaintenance of gravity sewers;
• CCTV inspection program to determine the condition of the gravity sewers; • Rehabilitation and replacement of sewers that are in poor condition; and • Periodic inspection and preventive maintenance for the lift stations and force mains • Documentation of finding and work performed into CMMS.

Force main alignments are inspected on an annual basis, and discharge locations surveyed for possible damage and corrosion from the release of hydrogen sulfide when the force mains discharge to the gravity collection system.

Figure 4-2 shows the City’s cleaning plan that prioritizes to clean the areas of the system with the highest risk of spill first, including City-identified maintenance “hot-spots”. These “hot spots” need to be part of the routine maintenance program requiring O&M frequencies appropriate for each specific “hot spot”.

Based on observation and collected data, The City has developed a 5-year preventativemaintenance cleaning and inspection programfor all gravity sewer mains. This program includes high pressure flushing of the gravitymain followed by closed circuit television (CCTV) inspection. In “hot spot” areas, the CCTV inspections are recommended every 1-3 years. The City also provides corrective maintenance, which is typically the result of service calls from staff or the public. Quick response from Collections staff often prevent potential spills from occurring, since staff can often clear blockages before a spill occurs. Collections staff can also minimize the impact GO SSMP Element 4.2.

A scheduling system and a data collection system for preventive operation and maintenance activities conducted by staff and contractors.

The scheduling system must include:
• Inspection and maintenance activities.
• Higher-frequency inspections and maintenance of known problem areas, including areas with tree root problems.
• Regular visual and closed-circuit television (CCTV) inspections of manholes and sewer pipes.

The data collection system must document data from system inspection and maintenance activities, including system areas/components prone to root-intrusion potentially resulting in system backup and/or failure. 254
Element 4 Operation and Maintenance Program
June 2025 4-4 Sewer System Management Plan
City of West Sacramento
of spills by containing and recovering the spill volume as quickly as possible. Recent updates to the City’s Sewer Master Plan and CMMS have helped provide detailed information about the infrastructure, allowing more accurate assessments of system components, including pipe diameters, materials, and installation years. 255
Element 4 Operation and Maintenance Program
June 2025 4-5 Sewer System Management Plan
City of West Sacramento
Figure 4-2
City of West Sacramento Sewer Cleaning Program

4.2.2 GRAVITY MAINS
Since 2015, the City has been conducting an ongoing sewer cleaning, documentation, and maintenance program.

The City plans to continue with its program to complete the comprehensive cleaning and CCTV inspection of the 256
Element 4 Operation and Maintenance Program
June 2025 4-6 Sewer System Management Plan
City of West Sacramento
entire collection system within the next five years. As of December 2023, the City has cleaned 75.7 miles, or

46.6%, of the gravity mains since the 2017 Master Plan, including most of the gravity mains identified as Priority 1 or 2. During the cleaning process, City staff identified approximately 3,200 feet as blocked, 2,100 feet as damaged, and 25,900 feet as having grease accumulation.

4.2.3 FORCE MAINS
Force mains are currently maintained as problems are identified. A prioritized and focused force main inspection program and preventative maintenance program should be developed in the next five years. City staff has indicated that the preventative maintenance program should initially focus on identification of “hot spots” and regular maintenance for the air relief valves and blow off valves along the force main alignment.

Table 4-1 lists forcemain asset information.Many of the forcemains were installed at the time of the original construction of the associated lift stations. Each of the pump stations discharge to a common forcemain that flows to a transition structure and then north of the Deep Water Channel to the CommonManifold near Southport PS and then discharges to the LNWI. The lengths of this shared force main are shown in Table 4-3 as “Common Force Main.

Table 4-1
Force Main Detail Associated with Lift Stations
Name of Lift Station
Associated with Force Main Material Diameter, inches PipeLength , miles
Allan LS PVC 6 1,770 0.3
Bridge District LS PVC 12 874 0.2
Bridgeway Island PS PVC 12 25,376 4.8
Bryte PS Steel 16 9,525 1.8
Coke LS PVC 8 217 0.0
Industrial PS Steel 14 11,325 2.1
Iron Works LS Steel 4 680 0.1
Jefferson PS Steel 18 13,727 2.6
Largo PS PVC 8 20,923 4.0
Northport PS DIP & PVC 16 10,139 1.9
Parlin Ranch PS PVC 8 4,475 0.8
South PS DIP 20 1,317 0.2
Southport PS PVC 16 to 24 861 0.2
Triangle LS DIP 4 876 0.2
Common Force Main DIP 20 to 36 9,127 1.9
Total 111,212 21.1
Lift Stations
The City operates andmaintains 14 lift stations and pump stations, as described in Table 4-2. Each of the stations discharge to force mains. Pump station asset information and work order history is currently managed by the City 257
Element 4 Operation and Maintenance Program
June 2025 4-7 Sewer System Management Plan
City of West Sacramento
using the PMC2000 Computerized Maintenance Management System (CMMS). Staff in the Utilities Maintenance and Maintenance divisions perform the tasks described on the preventative maintenance work order (PM). These PMs describe the work that is to be done to the pump stations associated structural, mechanical, and electrical infrastructure and equipment. The frequency of a PM is determined by manufacturer’s recommendations and/or a combination of experience and is intended to extend the life of equipment and to prevent equipment failure. The frequency of these inspections is listeded in Table 4-3. Pump station asset information and work order history is currently managed by the City using a Computerized Maintenance Management System (CMMS). The City has a list of the IDs of assets currently included in CMMS, making tracking and accounting of them relatively easy. 258
Element 4 Operation and Maintenance Program
June 2025 4-8 Sewer System Management Plan
City of West Sacramento
Table 4-2
Lift Stations Descriptions
Lift Station Name
Location
Construction
Year
No.

Pumps
Firm
Capacity,
GPM
Pump
Manufacturer
Pump
HP
Standby
Generation,
kW
Allan Lift Station
South End of
Allan St
1990 (2008
upgrade) 2 300
Smith &
Loveless 15
Portable
Generators
Used
Bridge
District
Lift
Station
South River Rd
near Tower St 2010 3 1,213 Flygt 70 225
Bridgeway
Island
Pump
Station
Golden Gate Dr near
Half Moon Bay Cir 2006 3 3,250
Smith &
Loveless 125
Portable
Generators
Used
Bryte
Pump
Station
West End of
Citrus St
1984 (2008
upgrade) 3 3,400 Smith & Loveless 200 500
Coke Lift Station Coke St 1964 2 175
Smith &
Loveless 3
Generators
Used
Industrial
Pump
Station
3930 Industrial
Blvd
1974 (2008
upgrade) 3 1,526
Smith &
Loveless 50
Portable
Generators
Used
Iron
Works
Lift
Station
North End of
Gallium Ct 2008 2 510 Sulzer 10 none
Jefferson
Pump
Station
555 Jefferson
Blvd
1988 (2008
upgrade)
3 3,900 Smith &
Loveless 100 295
Largo
Pump
Station
Otis Ave near
Southport Pkwy 2005 2 450 Smith & Loveless 60 260
Northport
Pump
Station
Northport Dr near
W. Capital Ave 1987 3 4,000
Smith &
Loveless 75
Portable
Generators
Used
Parlin
Ranch
Pump
Station
East End of
Hoopa Rd 2006 2 570 Flygt 12 50
South
Pump
Station
Park Blvd near
Stone Blvd
1948 (2008
upgrade) 3 764
Smith &
Loveless 15
Portable
Generators
Used
Southport
Pump
Station
2500 Jefferson
Blvd
1972 (2008
upgrade) 3 6,459 Smith &
Loveless 50 450
Triangle
Lift Station
Triangle Ct near
Jefferson
Blvd
1979 2 137 Chicago 3
Generators
Used
259
Element 4 Operation and Maintenance Program
June 2025 4-9 Sewer System Management Plan
City of West Sacramento
Table 4-3
Lift Station Maintenance Schedule

PM Frequency PM Frequency
Monthly
Quarterly
Bi-Annually
Annually
No PM
Component Type
Monthly
Quarterly
Bi-Annually
Annually
No PM
Access hatch  Lighting  
Adjustable frequency
drive  Lighting panel 
Air conditioning   Load bank 
Air low alarm  Low air pressure
bubbler system 
Air relief valve  Low-level alarm
switch 
Analytical instrument   Low-low float level
switch 
Automatic transfer switch  Main switchboard 
Bathroom  Manual transfer
switch 
Bio cube blower  Manway lift  
Bio cube control panel  Meter electric 
Bubbler & transfer panel  Motor 
Building  Motor control
center  
Cathodic protection   Motor control
panel 
Cathodic protection panel   Odor control unit 
Control cabinet for bio
cube  PLC control panel  
Crane  Power distribution
panel 
Dehumidifier  Pressure
transmitter 
Emergency power
generator
   Pump sewage  
Fan  Recorder, chart 
Flooded alarm switch  Seal water filter 
Flow transmitter  Soft start 
Harmonic conditioner  Tank 
Heater  Telephone 
Heating, ventilation, and
cooling
  Temperature
switch 
High-high float level
switch  Uninterruptable power supply 
Intrusion alarm  Valve  
Level transmitter  Variable
frequency drive  
Lift, maintenance  Well   
260
Element 4 Operation and Maintenance Program
June 2025 4-10 Sewer System Management Plan
City of West Sacramento

4.2.4 PRIVATE SEWER LATERALS
The City is responsible for the operation, repair or replacement of private sewer laterals below the cleanout and the connection to theCitymains. If the connection owner has no cleanout, they can be held responsible for its maintenance for the entire length of the cleanout. However, the City has historicallymaintained those systems too, installing a cleanout above the lower lateral, which includes the portion of the lower lateral from the cleanout at the property line to the City main. The City will continue to install new cleanouts as needed to facilitate cleaning and inspection equipment.

On commercial properties, laterals are the sole responsibility of the property owner.

4.2.5 REHABILITATION AND REPLACEMENT PROGRAM

4.2.5.1 Gravity Sewer.

The City is currently rehabilitating or replacing gravity sewer infrastructure to correct a backlog of condition defects, and/or as a part of other regional improvements. Now that the City has collected CCTV data for a portion of its system, it is time to assess that data for rehab/replacement needs in the coming year.

After CCTV inspection has been completed, rehab/replacement projects can be scoped, and sewers can be assigned a cleaning and inspection frequency appropriate for the maintenance and structural defects observed. In the past, City staffing and equipment resources have been too constrained to both systematically clean and inspect the system, so contractor support is needed.

4.2.5.2 Pump Stations.

The City has begun expanding its pump station capacity by starting with the South Pump Station Capacity Improvement Project, which also includes converting the wet pit/dry pit station to a submersible station. Condition upgrades have been recommended in the Sewer Master Plan (Appendix F) and are summarized in Table 9-4. of the Sewer Master Plan.

4.3 Training
The City provides regular technical, skill, and safety training to Public Works staff. The City is working on annual sanitary sewer spill training that includes developing spill response scenarios that will use the Sanitary Sewer Overflow Response plan and spill estimation procedures. This training will be in addition to professional training that the City provides through APWA, CWEA and other contractor-provided training. On an as needed basis, relevant DS staff will attend CWIQS training, as it comes available.

GO SSMP Element 4.3.

In-house and external training provided on a regular basis for sanitary sewer system operations and maintenance staff and contractors. The training must cover:

The requirements of this General Order;
The Enrollee’s Spill Emergency Response Plan procedures and practice drills; Skilled estimation of spill volume for field operators; and Electronic CIWQS reporting procedures for staff submitting data. 261
Element 4 Operation and Maintenance Program
June 2025 4-11 Sewer System Management Plan
City of West Sacramento
Training is documented in the Public Works training database. Safety elements and operation and maintenance practices are established in the Public Works Utility Maintenance/Maintenance Division’s Standard Operating Procedures (SOP). New SOP’s or updates to current SOP’s are stored in a computer file and made available in a SOP document binder. The City will require contractors to verify their employee training program.

4.4 Equipment Inventory

4.4.1 CONTINGENCY EQUIPMENT AND REPLACEMENT INVENTORIES The City’s corporation yard provides a central location for the Public Works Utility Maintenance/ Maintenance Division’s housing and storage of bulk materials, equipment, and parts used for routine tasks and emergency situations. Material, equipment, and spare part inventories are monitored and maintained by division staff. A CMMS tracks equipment in the system.

4.5 Implementation
Implementation Schedule
Track progress with the current cleaning schedule
with particular attention on City-identified “hot spots” Quarterly Track progress assessing gravity sewers with CCTV
and documentation Annually
Track employee spill training (when, what, who
attended). Annually
Track equipment and equipment maintenance in
CMMS Quarterly

4.6 Resilience
Element 4 assists in SSMP resilience by tracking the equipment, scheduling maintence, and showing the storm severs.

4.7 References
The following information was used to develop this Element:
• City of West Sacramento Geographic Information System (GIS) database, August 2014.

GO SSMP Element 4.4.

An inventory of sewer system equipment, including the identification of critical replacement and spare parts. 262
Element 4 Operation and Maintenance Program
June 2025 4-12 Sewer System Management Plan
City of West Sacramento
• Sewer Master Plan, Black & Veatch, 2024
263
June 2025 5-1 Sewer System Management Plan
City of West Sacramento
Element 5
5 Design and Performance Provisions

5.1 Updated Design Criteria and Construction Standards and Specificaions The City’s Sanitary Sewer Design Standards, Standard Plans, and Standard Specifications for sewer main lines, structures and appurtenances like maintenance holes, lift stations, and service laterals (lower laterals) are administered by the Development Engineering Division.

5.1.1 GENERAL
The City has established standards for both new construction and renewal and replacement work associated with the collection system. These standards are periodically reviewed and revised by the Development Engineering Division. Complete versions of the City's Standard Specifications and Details are located on the City's website at:
www.cityofwestsacramento.org/city/depts/comdev/engineering/specs/default.asp.

5.1.2 2024CITY SEWER MASTER PLAN UPDATE
The 2024 City Sewer Master Plan evaluated the sewer collection system using hydraulic model. The City’s sewer system hydraulic model was developed using Innovyze® InfoWorks™ ICM software. The model was originally developed in the 2017 Master Plan, and updated with the latest GIS data, as-built information, and field data collected in 2023. Using the model, the Sewer Master Plan identified capacity issues, including both gravity mains and pump stations. The need to address those issues have been incorporated into the CIP recommendations to address system upgrades. Proposed sewer improvements were tested in the model to confirm that they would eliminate the identified capacity deficiencies and to confirm that sewers and pump stations downstream of the upsized pipes could handle the higher peak flows.

The work done in the 2024 Sewer Master Plan satisfies the Element 5.1 of the 2022 GO modifications addressing Design and Performance Provisions.

GO SSMP Element 5.1.

Updated design criteria, and construction standards and specifications, for the construction, installation, repair, and rehabilitation of existing and proposed system infrastructure components, including but not limited to pipelines, pump stations, and other system appurtenances. If existing design criteria and construction standards are deficient to address the necessary component-specific hydraulic capacity as specified in section 8 (System Evaluation, Capacity Assurance and Capital Improvements) of this Attachment, the procedures must include component-specific evaluation of the design criteria.
264
Element 5 Design and Performance Provisions
June 2025 5-2 Sewer System Management Plan
City of West Sacramento

5.1.3 LIFT STATIONS
All lift stations are required to be designed and constructed to conform to the City’s Wastewater Pump Station Design Standards, which are maintained by the Community Development Division and which are available from the City. In the 2024 Sewer Master Plan, all lift stations were assessed for hydraulic capacity, including future needed capacity. Those that were found insufficient are included to upgrading in the CIP.

5.1.4 CITY SEWER SYSTEM –AUTHORIZED PIPE MATERIALS
The authorized materials that are currently accepted in the City Sewer System are shown in the City’s Standard Specifications and Details.

Laterals must be of the same material type and designation as that used for the main sanitary sewer pipe.

5.1.5 PRIVATE SEWER SYSTEMS AND PRIVATE LATERALS
All private sewer systems and private sewer laterals are required to be designed, installed, inspected and accepted per the requirements for sewers in Division 1, Section 5 and Division IV, Section 14 of the Standard Specifications except for the following modifications:
• The minimum size of any on-site sanitary sewer main shall be four inches in diameter; • Pipe depth to finish grade and/or subgrade must be in conformance with the specifications of the pipe manufacturer; and
• All on-site sanitary sewer manholes shall be constructed in accordance with the Standard Details.

There are no City requirements for the spacing of on-site sanitary sewer manholes. However, future maintenance and accessibility should be considered. All Sanitary Sewer Design Calculations shall be signed and stamped by a California registered civil engineer prior to approval by the City.

5.2 Procedures and Standards
The City’s Wastewater Collection System inspection and testing criteria are documented in the Standard Specifications and Details, and include:

5.2.1 NEW AND REHABILITATED GRAVITY SEWERS
The City has rules and regulations for sewer construction and the disposal of sewage and drainage from buildings and for the connection to the sewage works to the City collection system. All work with respect thereto is required to be performed in a manner consistent with the municipal code.

GO SSMP Element 5.2.

Procedures, and standards for the inspection and testing of newly constructed, newly installed, repaired, and rehabilitated system pipelines, pumps, and other equipment and appurtenances. 265
Element 5 Design and Performance Provisions
June 2025 5-3 Sewer System Management Plan
City of West Sacramento

5.2.2 DESIGN
Engineering calculations to support the sewer system design shall be submitted to the City Engineer for approval.

5.2.2.1 Leakage
Sewer mains must be tested following Standard Specifications Division IV, Section 14.03D Testing of Sewer Lines. After acceptance of the street subgrade and/or trench backfill all gravity sewers must pass a low-pressure air test in the presence of the City Engineer conducted in accordance with the Standard Specifications. If the installation fails to meet this requirement, the Contractor shall, at his own expense, determine the source of leakage. He shall then repair or replace all defective materials and/or workmanship and perform the air test as many times as necessary to achieve an acceptable test.

5.2.2.2 CCTV Inspection
Prior to acceptance of any sanitary sewer line by the City, all six-inch and larger lines shall be inspected internally by television in the presence of the City Engineer as outlined in Division IV, Section 14.03D Testing of Sewer Lines at the Contractor’s expense. Defects such as high and low spots, joint separations, offset joints, chipped ends, cracked or damaged pipe, infiltration points and debris in lines shall be corrected by the Contractor, at his expense.

5.2.3 NEW AND REHABILITATED MANHOLES

5.2.3.1 Inspection during Construction
All new gravity sewers will be periodically inspected during construction to ensure that the sewer is constructed using the specified materials and methods. All sewer line connections to manholes, trunk sewers, main sewers, or side sewers shall be left uncovered until after the inspection has been made.

5.2.3.2 Leakage
Sewer mains and manholes will be tested following Standard Specifications Division IV, Section 14.03D Testing of Sewer Lines. All sewer manholes must pass a vacuum test performed by the Contractor after installation of the manhole but prior to placement of trench backfill. If a manhole fails the vacuum test, repairs shall be made with mortar while the vacuum is still being drawn. Retesting shall proceed until a satisfactory test is obtained.

5.2.4 NEW AND REHABILITATED LIFT STATIONS
New and rehabilitated lift stations are inspected during construction, and subject to performance testing prior to being brought on-line.

5.3 Implementation
Implementation Schedule
Track progress on implementing the 2024 CIP. Annually
Evaluate success placing information in the CMMS,
as work progresses on sewer infrastructure Annually
266
Element 5 Design and Performance Provisions
June 2025 5-4 Sewer System Management Plan
City of West Sacramento

5.4 References
The following information was used to develop this Element:
• City of West Sacramento Standard Specifications and Details, 2002 • Amendments to Standard Specifications and Details dated 9/12/2009, 9/1/2010, and 7/24/2015.
267
June 2025 6-1 Sewer System Management Plan
City of West Sacramento
Element 6
6 Spill Emergency Response Plan
GO SSMP Element 6.

The Plan must include an up to date Spill Emergency Response Plan to ensure prompt detection and response to spills to reduce spill volumes and collect information for prevention of future spills. The Spill Emergency Response Plan must include procedures to:
• Notify primary responders, appropriate local officials, and appropriate regulatory agencies of a spill in a timely manner;
• Notify other potentially affected entities (for example, health agencies, water suppliers, etc.) of spills that potentially affect public health or reach waters of the State; • Comply with the notification, monitoring and reporting requirements of this General Order, State law and regulations, and applicable Regional Water Board Orders; • Ensure that appropriate staff and contractors implement the Spill Emergency Response Plan and are appropriately trained;
• Address emergency system operations, traffic control and other necessary response activities; • Contain a spill and prevent/minimize discharge to waters of the State or any drainage conveyance system;
• Minimize and remediate public health impacts and adverse impacts on beneficial uses of waters of the State;
• Remove sewage from the drainage conveyance system;
• Clean the spill area and drainage conveyance system in a manner that does not inadvertently impact beneficial uses in the receiving waters;
• Implement technologies, practices, equipment, and interagency coordination to expedite spill containment and recovery;
• Implement pre-planned coordination and collaboration with storm drain agencies and other utility agencies/departments prior, during, and after a spill event; • Conduct post-spill assessments of spill response activities; • Document and report spill events as required in this General Order; and • Annually, review and assess effectiveness of the Spill Emergency Response Plan, and update the Plan as needed.
268
Element 6 Spill Emergency Response Plan
June 2025 6-2 Sewer System Management Plan
City of West Sacramento

6.1 Purpose
The purpose of the City’s Sanitary Sewer Overflow Response Plan (SSORP) (Appendix B) is to provide procedures to effectivelymanage the response and the remediation of a spill when it occurs in an effort to protect public health as well as the environment. The SSORP provides guidelines for City personnel to follow in responding to, cleaning up, and reporting spills that may occur within the City’s service area. This SSORP satisfies the SWRCB Statewide General Waste Discharge Requirements (GWDR), which require wastewater collection agencies to have an Overflow Emergency Response Plan.

6.2 Policy
The City’s employees are required to report all wastewater overflows resulting from the Cityowned/maintained sanitary sewer system found and to take the appropriate action to secure the wastewater overflow area, properly report to the appropriate regulatory agencies, relieve the cause of the overflow, and ensure that the affected area is cleaned as soon as possible to minimize health hazards to the public and protect the environment. The City’s goal is to respond to sewer system overflows as soon as possible following notification. The City will follow reporting procedures in regard to sewer spills as set forth by the Central Valley Regional Water Quality Control Board (CVRWQCB) and the California State Water Resources Control Board (SWRCB).

6.3 Goals
The City’s goals with respect to responding to spills are:
• Work safely;
• Respond quickly to minimize the volume of the spill;
• Eliminate the cause of the spill;
• Prevent sewage system overflows or leaks from entering the storm drain system or receiving waters to the maximum extent practicable;
• Contain the spilled wastewater to the extent feasible; • Minimize public contact with the spilled wastewater;
• Mitigate the impact of the spill;
• Meet the regulatory reporting requirements;
• Evaluate the causes of failure related to certain spills; and • Revise response procedures resulting from the debrief and failure analysis of spills.

6.4 Spill Detection and Notification
The processes that are employed to notify the City of the occurrence of an spill include: observation by the public, receipt of an alarm, or observation byCity staff during the normal course of their work.

TheCity operateswastewater pump stations. In the event of any pump failure, the high level sensor activates the SCADA alarm system and the City is contacted. To prevent overflow, wastewater fromthe wet well can either be pumped into a vacuumtruck for disposal to a nearby sanitary sewer manhole, or bypassed around the station into the sanitary sewer system. Each pump station has an emergency response plan that can be followed in the event of a pump failure.
269
Element 6 Spill Emergency Response Plan
June 2025 6-3 Sewer System Management Plan
City of West Sacramento

6.4.1 PUBLIC OBSERVATION
Public observation is the most common way that the City is notified of blockages and spills. Once the initial call is made reporting the spill, the report is dispatched to the Chief UtilityMaintenance Worker during normal working hours or to theOn-call UtilityMaintenance Worker after hours for response. The responding employee is responsible for determining whether additional city personnel are necessary to aid in containment, clean-up and remediation.

NormalWorkHours. Customers can report sewer problems by telephone at 916-617-4850 during normal working hours (Monday through Friday from 8:00 am to 4:30 pm). The office staff takes the call and notifies the Chief Utility Maintenance Worker.

After Hours. After hours, the Public Works phone system redirects incoming phone calls to 916-617-4850 to the Dispatch Center or this center can be called directly at 916-372-3375. The Dispatch Center will notify the On-call Utility Maintenance Worker.

If an spill occurs within the portion of the sanitary sewer collection system maintained and operated by the Sacramento Regional County Sanitation District the City contacts Sacramento County Central at 916-875-5000.

When calls are received, either during normal work hours or after hours, the individual receiving the call will collect the following information:
• Time and date of call;
• Specific location of potential problem;
• Nature of call;
• In case of spill, estimated start time of overflow;
• Caller’s name, address and telephone number;
• Caller’s observation (e.g., odor, duration, location on property, known impacts, indication if surface water impacted, appearance at cleanout or manhole); and • Other relevant information.

The City’s Public Works Department will be responsible for establishing a communication center in the event of a Category 1 spill. The communication center will consist of one of the following Public Works employees:
• Public Works Operations Manager;
• Utilities Maintenance Superintendent;
• Chief Utilities Maintenance Worker; and
• Public Works Senior Clerk.

The designated employee will be stationed at a predetermined location within the Public Works Administration building. The communication center will be the direct line of communication with outside regulatory and emergency agencies as well as responding city crews.

Figure 6-1 provides an overview of receiving a sewage overflow or backup report. 270
Element 6 Spill Emergency Response Plan
June 2025 6-4 Sewer System Management Plan
City of West Sacramento
Figure 6-1
Overview of Receiving a Sewer Overflow or Backup Report Procedure 271
Element 6 Spill Emergency Response Plan
June 2025 6-5 Sewer System Management Plan
City of West Sacramento

6.5 City Staff Observation
City staff conducts periodic inspections of its sewer system facilities as part of their routine activities. Any problems noted with the sewer system facilities are reported to appropriate City staff that, in turn, responds to emergency situations. Work orders are issued to correct non-emergency conditions.

6.6 Contractor Observation
The following procedures are to be followed in the event that contractor/plumber causes or witnesses a spill. In the contractor/plumber causes or witnesses an spill they should:
• Immediately notify the City at 916-617-4850;
• Protect storm drains;
• Protect the public;
• Provide information to the Chief Utility Maintenance Worker or On-call Utility Maintenance Worker such as start time, appearance point, suspected cause, weather conditions, etc; and
• Direct ALL media and public relations requests to the Communications and Media Office, at 916-617-4516, who will provide the media with all relevant information.

6.7 Spill RESPONSE PROCEDURES

6.7.1 SEWER OVERFLOW/BACKUP RESPONSE SUMMARY
The City will respond to spills as soon as feasible following notification of an overflow/backup or unauthorized discharge. Figure 6-2 provides an overview of the response activities. 272
Element 6 Spill Emergency Response Plan
June 2025 6-6 Sewer System Management Plan
City of West Sacramento
Figure 6-2
Overview of Spill and Backup Response Procedure

6.7.2 FIRST RESPONDER PRIORITIES
The first responder’s priorities are:
273
Element 6 Spill Emergency Response Plan
June 2025 6-7 Sewer System Management Plan
City of West Sacramento
• To follow safe work practices;
• To respond promptly with the appropriate and necessary equipment or call for additional staff assistance;
• To contain the spill wherever feasible;
• To restore the flow as soon as practicable;
• To minimize public access to and/or contact with the spilled sewage; • To promptly notify the Supervisor in event of major spill; • To return the spilled sewage to the sewer system;
• To restore the area to its original condition (or as close as possible); and • To photograph or video field conditions of the spill.

6.7.3 SAFETY
The first responder is responsible for following safety procedures at all times. Special safety precautions must be observed when performing sewer work. There may be times when City personnel responding to a sewer system event are not familiar with potential safety hazards peculiar to sewer work. In such cases it is appropriate to take the time to discuss safety issues, consider the order of work, and check safety equipment before starting the job.

6.7.4 INITIAL RESPONSE
The first responder must respond to the reporting party/problem site and visually check for potential sewer stoppages or overflows.

The first responder will:
• Note arrival time at the site of the overflow/backup. • Verify the existence of a sewer system spill or backup. • Determine if the overflow or blockage is from a City-owned/maintained or private sewer. • Identify and assess the affected area and extent of spill. • Contact caller if time permits.
• If the spill is large or in a sensitive area, document conditions upon arrival with photographs. Decide whether to proceed with clearing the blockage to restore the flow or to initiate containment measures.

The guidance for this decision is:
• Small spills (i.e., spills that are easily contained) – proceed with clearing the blockage. • Moderate or large spill where containment is anticipated to be simple – proceed with the containment measures.
• Moderate or large spills where containment is anticipated to be difficult – proceed with clearing the blockage; however, whenever deemed necessary, call for additional assistance and implement containment measures.
• Take steps to contain the spill. For detailed procedures refer to the Sanitary Sewer Overflow Response Plan/Backup Response Packet, included as Appendix B to this report.

In the event of a failure on a sewermain line, sewer forcedmain, pump station or any other portion of the sanitary sewer collection system, it may be necessary to notify upstream industrial dischargers of the situation and request that they reduce their sewer discharge. Additionally, some sanitary sewer pump stations are fed by other sanitary 274
Element 6 Spill Emergency Response Plan
June 2025 6-8 Sewer System Management Plan
City of West Sacramento
sewer pump stations within the system. In these cases, upstream pump stations will need to be turned off so repairs can bemade. Continuous monitoring of pump station wet well levels shall be conducted to ensure that the capacity is sufficient for the time the pump station is off. Large failures may require an extended amount of time for repair. Bypass pumping (manhole to manhole) and/or mobile sewage collection may be necessary with prolonged repair. If necessary, City staff will coordinate with commercial septage haulers for assistance. A listing of septage haulers is shown in Table 6-1.

Table 6-1
Septage Haulers
Company Name Phone Number Location
A-1 Septic Service 916-371-4160 Sacramento, 10 miles from City BCM Company 916-383-4533 Sacramento, 9 miles from City
G&C Septic Tank Service 916-366-1111 Galt, 28 miles from City Yolo Pumping Services, Inc. 530-662-5534 Woodland, 19 miles from City

6.7.5 INITIATE SPILL CONTAINMENT MEASURES
When an spill occurs, all feasible steps must be taken to prevent impacts including controlling or limiting the amount of wastewater to the storm drain system, terminating the discharge and recovering and properly disposing of as much of the spill as possible including wash down water that is used. Standard Operating Procedures (SOPs) have been developed and implemented covering cleanup and remediation of spills. These SOPs are found in Appendix B.

The first responder will attempt to contain as much of the spilled sewage as possible using the following steps:
• Determine the immediate destination of the overflowing sewage; • Plug storm drains using air plugs, sandbags, and/or plastic mats to contain the spill, whenever appropriate. If spilled sewage has made contact with the storm drainage system, attempt to contain the spilled sewage by plugging downstream storm drainage facilities; • Contain/direct the spilled sewage using dike/dam or sandbags; and • Pump around the blockage/pipe failure.

For detailed procedures refer to the Sanitary Sewer Overflow Response Plan/Backup Response Packet, included as Appendix B to this Plan.

6.7.6 RESTORE FLOW
Using the appropriate cleaning equipment, the responding crew will set up downstream of the blockage and hydroclean upstream from a clear manhole. Attempt to remove the blockage from the system and observe the flows to ensure that the blockage does not reoccur downstream. If the blockage cannot be cleared within a reasonable time from arrival, or sewer requires construction repairs to restore flow, then initiate containment and/or bypass pumping. If other assistance is required, immediately contact the Public Works OperationManager. For detailed procedures refer to the Sanitary Sewer Overflow Response Plan/Backup Response Packet, included as Appendix B.
275
Element 6 Spill Emergency Response Plan
June 2025 6-9 Sewer System Management Plan
City of West Sacramento

6.7.7 EQUIPMENT
This section provides a list of specialized equipment that may be used to support this Overflow Emergency Response Plan:
• Closed Circuit Television (CCTV) Inspection Unit. A CCTV Inspection Unit is required to determine the root cause for all spills from gravity sewers.
• Camera. A digital or disposable camera is required to record the conditions upon arrival, during clean up, and upon departure.
• EmergencyResponse Trucks. A utility body pickup truck, or open bed is required to store and transport the equipment needed to effectively respond to sewer emergencies. The equipment and tools will include containment and clean up materials.
• Portable Generators, Portable Pumps, Piping, and Hoses. Equipment used to bypass pump, divert, or power equipment to mitigate an spill.
• Combination Sewer Cleaning Trucks. Combination high velocity sewer cleaning trucks with vacuum tanks are required to clear blockages in gravity sewers, vacuum spilled sewage, and wash down the impacted area following the spill event.
• Air Plugs, Sandbags and Plastic Mats
• Portable Lights

6.8 Recovery and Cleanup
The recovery and cleanup phase begins immediately afterthe flow has been restored and the spilled sewage has been contained to the extent possible. The spill recovery and cleanup procedures are:

6.8.1 ESTIMATE THE VOLUME OF SPILLED SEWAGE
Use the methods outlined in Appendix B, and/or the Field Guide to estimate the volume of the spilled sewage.

Wherever possible, document the estimate using photos and/or video of the spill site before and during the recovery operation.

6.8.2 RECOVERY OF SPILLED SEWAGE
Vacuumup and/or pump the spilled sewage and rinse water, and discharge it back into the sanitary sewer system. 276
Element 6 Spill Emergency Response Plan
June 2025 6-10 Sewer System Management Plan
City of West Sacramento

6.8.3 CLEAN-UP AND DISINFECTION
Clean up and disinfection procedureswill be implemented to reduce the potential for human health issues and adverse environmental impacts that are associated with an spill event. The procedures described are for dry weather conditions and will be modified as required for wet weather conditions. Where cleanup is beyond the capabilities of the Field Crew, a cleanup contractor will be used. • Private Property. City crews are responsible for the cleanup when the property damage is minor in nature and is outside of private building dwellings, such as in front, side and backyards, easements, etc.

In all other cases, affected property owners can call a water damage restoration contractor to complete the cleanup and restoration. If the overflow into property is the definite cause of City system failure, the property owner can call out a water damage restoration contractor to complete the cleanup and restoration. In both cases, property owners may obtain a City claim form from the City Manager’s Office.

If an spill in the City’s maintained system resulted in a flooded home or structure the City’s insurance carrier will be the lead on any claims.
• Hard Surface Areas. Collect all signs of sewage solids and sewage-related material either by protected hand or with the use of rakes and brooms. Wash down the affected area with clean water and/or Deozyme or similar non-toxic biodegradable surface disinfectant until the water runs clear. The flushing volume will be approximately three times the estimated volume of the spill. Take reasonable steps to contain and vacuum up the wastewater. Allow area to dry. Repeat the process if additional cleaning is required.
• Landscaped and Unimproved Natural Vegetation. Collect all signs of sewage solids and sewagerelated material either by protected hand or with the use of rakes and brooms. Wash down the affected area with clean water until the water runs clear. The flushing volume will be approximately three times the estimated volume of the spill. Either contain or vacuum up the wash water so that none is released.

Allow the area to dry. Repeat the process if additional cleaning is required. • Natural Waterways. The California Department of Fish and Wildlife will be notified by CalOES for spills greater than or equal to 1,000 gallons.
• Wet Weather Modifications. Omit flushing and sampling during heavy storm events (i.e., sheet of rainwater across paved surfaces) with heavy runoff where flushing is not required and sampling would not provide meaningful results.
277
Element 6 Spill Emergency Response Plan
June 2025 6-11 Sewer System Management Plan
City of West Sacramento

6.9 Notification
This section describes public and downstream water purveyor notification procedures.

6.9.1 PUBLIC NOTIFICATION
Contamination warning signs and barricades shall be posted at spill sites when the spill is in a public area and/or enters a waterway or based on requirements issued by outside regulatory agencies until the site is determined to be cleaned. Contamination warning signs shall be posted by Utility Maintenance personnel and by the contractor if the spill is construction related. The warning signs serve to provide a warning of potential health risks due to sewage contamination. If signage is required the Public Works Operations Manager shall notify the Communications and Media Officer. The area and warning signs, once posted, will be checked every day to ensure that they are still in place. Photographs of sign placement will be taken. Signs will not be removed until directed by County Environmental Health, the Public Works Supervisor or designee.

When public health could be affected and contact with the local media is deemed necessary, the City Public Information Officer will provide the media with all revelvant information.

6.9.2 DOWNSTREAM NOTIFICATION
In the event of an spill discharge to surface water a determination will be made by the Public Works Manager whether drinking water for water purveyors downstream will become impacted. Downstreamwater purveyors are identified in Table 6-2. If necessary, contact should bemade and information regarding the spill relayed.

Table 6-2
Downstream Water Purveyors
Purveyor Name Phone Number
City of Rio Vista Main: 707-374-6451
Solano County Water Agency Main: 707-451-6090
Contra Costa Water District Main: 925-688-8000
East Bay Municipal Utility District (Freeport Intake) Eric Mische: 916-226-8332

6.10Water Quality

6.10.1 WATERS OF THE STATE
Waters of the State (or waters of the United States)means any surface water, including saline waters, within the boundaries of California. In case of a sewage spill, catch basins, storm drains and retention basins are considered to be waters of the State for spill purposes unless the sewage is completely contained and returned to the sanitary sewer collection system and that portion of the storm drain is cleaned. 278
Element 6 Spill Emergency Response Plan
June 2025 6-12 Sewer System Management Plan
City of West Sacramento

6.10.2 WATER QUALITY SAMPLING AND TESTING
Water quality sampling and testing is required for Category 1 spills of 50,000 gallons or greater to determine the extent and impact of the spill. The water quality sampling procedures must be implemented within 48 hours and include the following:
• The contracted lab staff will collect samples as soon as possible after the discovery and mitigation of the spill event;
• The water quality samples will be collected from upstream of the spill, from the spill area, and downstream of the spill in flowing water (e.g. creeks). The water quality samples will be collected near the point of entry of the spilled sewage; and
• The samples shall then be brought to an acceptable laboratory for analysis.

A list of laboratories certified for water quality analysis by Yolo County of acceptable laboratories are included at the end of Appendix B.

6.10.3 WATER QUALITY MONITORING PLAN
The City Water Quality Monitoring Plan will be implemented immediately upon discovery of any Category 1 spill of 50,000 gallons ormore in order to assess impacts fromspills to surface waters. The spill Water Quality Monitoring Program will:
• Contain protocols for water quality monitoring;
• Account for spill travel time in the surface water and scenarios where monitoring may not be possible (e.g. safety, access restrictions, etc.);
• Require water quality analyses for ammonia and bacterial indicators to be performed by an accredited or certified laboratory; • Require monitoring instruments and devices used to implement the spill Water Quality Monitoring Program to be properly maintained and calibrated, including any records to document maintenance and calibration, as necessary, to ensure their continued accuracy;
• Within 48 hours of the City becoming aware of the spill, require water quality sampling for ammonia and total and fecal coliform or other parameters as directed by the CVRWQCB Basin Plan; and • Observe proper chain of custody procedures.
279
Element 6 Spill Emergency Response Plan
June 2025 6-13 Sewer System Management Plan
City of West Sacramento

6.10.4 SPILL TECHNICAL REPORT
The City will submit an LROcertified spill Technical Report to the CIWQS Online spill Database within 45 calendar days of the spill end date for any spill in which 50,000 gallons or greater are spilled to surface waters. The Public Works Operations Manager will supervise the preparation of this report and will certify this report. This report, which does not preclude the Water Boards from requiring more detailed analyses if requested, shall include at a minimum, the following:
• Causes and Circumstances of the spill
o Complete and detailed explanation of how and when the spill was discovered. o Documented contact information from the original caller and any others interviewed at the site.
o Diagram showing the spill failure point, appearance point(s), and final destination(s). o Detailed description of the methodology employed and available data used to calculate the volume of the spill and, if applicable, the spill volume recovered. o Detailed description of the cause(s) of the spill.
o Copies of original field crew records used to document the spill. o Historical maintenance records for the failure location. • City’s Response to spill
o Chronological narrative description of all actions taken by the City to terminate the spill. o Explanation of how the SSMP Overflow Emergency Response Plan was implemented to respond to and mitigate the spill.
o Final corrective action(s) completed and/or planned to be completed, including a schedule for actions not yet completed.
• Water Quality Monitoring
o Description of all water quality sampling activities conducted including analytical results and evaluation of the results.
o Detailed location map illustrating all water quality sampling points. 280
Element 6 Spill Emergency Response Plan
June 2025 6-14 Sewer System Management Plan
City of West Sacramento

6.11Sewer Backup into/onto Private Property Claims Handling Procedure If an spill in the City’s maintained system resulted in a flooded home or structure the City’s insurance carrier will be the lead on any claims. It is the procedure of the City that a claims form shall be offered to anyone wishing to file a claim. The following procedures will be observed for all sewer overflows/backups into/onto private property:
• Collections Crew or other Field Crew will direct the resident to the City Manager’s Office or City website to obtain a City claim form whenever it is possible that the sanitary sewer backup may have resulted from an apparent blockage in the City-owned sewer lines or whenever a City customer requests a claim form. The claim may later be rejected if subsequent investigations into the cause of the loss indicate the City was not at fault.
• It is the responsibility of the Field Crew to gather information regarding the incident and notify the Supervisor or his/her designee.
• It is the responsibility of the City Manager’s Office to review all claims and to oversee the adjustment and administration of the claim to closure.

6.12 Notification, Reporting, Monitoring and Record and Recordkeeping Requirements In accordance with the Statewide General Waste Discharge Requirements for Sanitary Sewer Systems (SSS GWDRs) and the most recent Monitoring and Reporting Program (MRP), the City of West Sacramento maintains records for each sanitary sewer overflow. Records include:
• Documentation of response steps and/or remedial actions. • Photographic evidence to document the extent of the spill, field crew response operations, and site conditions after field crew spill response operations have been completed. The date, time, location, and direction of photographs taken will be documented.
• Documentation of how any estimations of the volume of discharged and/or recovered volumes were calculated including all assumptions made.
• Documentation of emergency start time.
• All records required by the MRP.
• Electronicmonitoring records relied upon in volume estimation.

6.12.1 REGULATOR REQUIRED NOTIFICATIONS
Regulator required actions are outlined in Table 6-3.
281
Element 6 Spill Emergency Response Plan
June 2025 6-15 Sewer System Management Plan
City of West Sacramento
Table 6-3
Regulator Required Actions
Action Deadline
Spill Category
Category 1 Category 2 Category 3 Category 4 No Spill
Notification
2 hours after
becoming aware
of spill
If spill is greater than
or equal to 1,000
gallons, notify CalOES
at
800-852-7550 and
obtain a notification
control number.
- - -
Reporting
3 days after
becoming aware
of spill Submit draft Spill Report in CIWQS - -
15 days after
response
conclusion
Certify Spill Report in CIWQS – update
as needed until 120 days after spill end
date
- -
30 days after
end of calendar
month in which
spill occurred
- -
Certify Spill
Report in
CIWQS –
update as
needed until
120 days after
spill end date
Submit
Category 4
Spill Notifiction
Submit No Spill
Certification
45 days after
spill end date
If 50,000 gallons or
greater are not
recovered, submit spill
Technical Report in
CIWQS
- - -
Record
Keeping As Needed
The City will maintain the following spill records:
• Spill Event Records
• Records documenting SSMP implementation and
changes/updates to the SSMP
• Records to document Water Quality Monitoring for spills of 50,000 gallons or greater spilled to surface waters. • Collection system telemetry records if relied upon to document and/or estimate spill volume
-
Reports submitted into the California Integrated Water Quality System (CIWQS) Online SSO Database (http://ciwqs.waterboards.ca.gov/) must be certified by the Legally Responsible Official (LRO). In the event that the CIWQS online SSO database is not available, the Chief Utility Maintenance Worker will notify SWRCB by phone in accordance with the time schedules identified in Table 10. In such an event, the City will submit the appropriate reports using the CIWQS online SSO database when the database becomes available. Any change in the LRO(s) including deactivation or a change to contact information, will be submitted to the SWRCB within 30 days of the change by calling 866-792-4977 or emailing [email protected]. 282
Element 6 Spill Emergency Response Plan
June 2025 6-16 Sewer System Management Plan
City of West Sacramento
For reporting purposes, if one spill event of whatever category results in multiple appearance points in a sewer system, a single spill report is required in CIWQS that includes the GPS coordinates for the location of the spill appearance point closest to the failure point, blockage or location of the flow condition that cause the spill, and descriptions of the locations of all other discharge points associated with the single spill event.

6.12.2 COMPLAINT RECORDS
The City maintains records of all complaints received whether or not they result in sanitary sewer overflows. These complaint records include:
 Date, time, and method of notification;
 Date and time the complainant or informant first noticed the spill or occurrence related to the call;  Narrative description describing the complaint;
 A statement from the complainant or informant, if they know, of whether or not the potential spill may have reached waters of the state;
 Name, address, and contact telephone number of the complainant or informant reporting the potential spill (if not reported anonymously);
 Follow-up return contact information for each complaint received (if not reported anonymously);  Final resolution of the complaint with the original complainant; and  Work service request information used to document all feasible and remedial actions taken.

If the service request requires work on the sewer or other City infrastructure, a work order is created. All sewer service requests are logged on the Sewer/spill Report by the responding field crew. If the service request turns out to not be sewer related, this information is captured on this form and the true nature of the service request identified.

The Chief Utility Maintenance Worker is responsible for maintaining separate files for each completed Sewer spill Report for five years or as otherwise directed by the CVRWQCB or the SWRCB. 283
Element 6 Spill Emergency Response Plan
June 2025 6-17 Sewer System Management Plan
City of West Sacramento

6.13Post Spill Event Debriefing
Every spill event is an opportunity to evaluate the City response and reporting procedures. Each overflow event is unique, with its own elements and challenges including volume, cause, location, terrain, climate, and other parameters.

As soon as possible after Category 1 and Category 2 spill events all of the participants, from the person who received the call to the last person to leave the site, will meet to review the procedures used and to discuss what worked and where improvements could be made in preventing or responding to and mitigating future spill events.

The results of the debriefing will be documented including attendees, summary of discussions, action items identified and assignments and schedules for completion and tracked to ensure the action items are completed as scheduled.

6.14 Failure Analysis Investigation
The objective of the failure analysis investigation is to determine the “root cause” of the spill and to identify corrective action(s) needed that will reduce or eliminate future potential for the spill to recur or for other spills to occur.

The investigation will include reviewing all relevant data to determine appropriate corrective action(s) for the line segment. The investigation will include:
• Reviewing and completing the Sanitary Sewer Overflow Report and any other documents related to the incident;
• Reviewing the incident timeline and other documentation regarding the incident; • spill start time documentation;
• Reviewing communications with the reporting party and witness; • Reviewing volume estimate, volume recovered estimate, volume estimation assumptions and associated drawings and maps of the impacted area(s);
• Reviewing available photographs and video of the incident; • Interviewing staff that responded to the spill;
• Reviewing pastmaintenance records and SCADA records if utilized; • Reviewing past CCTV records;
• Conducting a CCTV inspection to determine the condition of all line segments immediately following the spill and reviewing the video and logs;
• Reviewing any Fats, Oils, Roots and Grease (FROG) related information or results; 284
Element 6 Spill Emergency Response Plan
June 2025 6-18 Sewer System Management Plan
City of West Sacramento
• Post spill debrief records; and
• Documented interviews with the public at the spill location.

The product of the failure analysis investigation will be the determination of the root cause and the identification and scheduling of the corrective actions. The Collection System Failure Analysis Form) will be used to document the investigation.

6.15Spill Response Training
This section provides information on the training that is required to support this Overflow Emergency Response Plan.

6.16 Initial and Annual Refresher Training
TheCity ofWestSacramento’sPublicWorksDepartment Environmental ServicesDivision (ESD) will schedule and document training sessions for applicable city staff as needed to assist in the awareness of the policies and procedures contained within this SSORP and to ensure that the various personnel involved are aware of their responsibilities and duties. All new employees will receive training before they are placed in a position where they may have to respond. Current employees will receive annual refresher training on this plan and the procedures to be followed.

Affected employees will receive regular training on the following topics by knowledgeable trainers:
• The City’s Sanitary Sewer Overflow Response Plan and Sanitary Sewer Management Plan; • Sanitary Sewer Overflow Volume Estimation Techniques; • Researching and documenting Sanitary Sewer Overflow Start Times; • Impacted Surface Waters: Response Procedures;
• State Water Resources Control Board Employee Knowledge Expectations; • Employee Core Competency Evaluations on Sanitary SewerOperations; and • Water Quality Sampling Plan.

The City will verify that annual safety training requirements are current for each employee, and that employees are competent in the performance of all core competencies. This will be verified through electronic testing, interviews and observations. The City will address, through additional training/instruction, any identified gaps in required core competencies.

6.16.1 SPILLRESPONSE DRILLS
Periodic training drills or field exercises will be held to ensure that employees are up to date on these procedures, equipment is in working order, and the required materials are readily available. The training drills will cover 285
Element 6 Spill Emergency Response Plan
June 2025 6-19 Sewer System Management Plan
City of West Sacramento
scenarios typically observed during sewer related emergencies (e.g. mainline blockage,mainline failure, and lateral blockage). The results and the observations during the drills will be recorded and corrective action items or procedures changes will be tracked to ensure completion and identified in the SSMP Change Log.

6.16.2 SPILL TRAINING RECORD KEEPING
Records will be kept of all training that is provided in support of this plan. The records for all scheduled training courses and for each overflow emergency response training event and will include date, time, place, content, name of trainer(s), and names and titles of attendees.

6.16.3 CONTRACTORS WORKING ON CITY SEWER FACILITIES
All construction contractors working on City sewer facilities will be required to develop a project-specific SSORP, will provide project personnel with training regarding the content of the contractor’s SSORP and their role in the event of an spill, and to follow that SSORP in the event that they cause or observe an spill. Emergency response procedures shall be discussed at project pre-construction meetings, regular project meetings and after any contractor involved incidents.

All service contractors will be provided, and required to observe contractor procedures.

6.17Authority
• California Health and Safety Code §5410 – 5416
• California Water Code 13271
• Fish and Game Code §5650 – 5656
• State Water Resources Control Board Order No. 2022-0103-DWQ

6.18 Implementation
Implementation Plan
Submit all necessary, annual and monthly reports Monthly As part of the Annual Report, the City will consider the effectiveness of the SORP and update, as needed. Annually

6.19Resilience
The Sanitary Sewer Overflow Response Plan provides resilience by creating efficiency in cleanups if and when spills occur. It documents the line of communication and reporting. It also provides a resource for training. 286
Element 6 Spill Emergency Response Plan
June 2025 6-20 Sewer System Management Plan
City of West Sacramento

6.20References
The following information was used to develop this Element:. • The Sanitary Sewer Overflow Response Plan, City of West Sacramento 287
June 2025 7-1 Sewer System Management Plan
City of West Sacramento
Element 7
7 Sewer Pipe Blockage Control Program

7.1 Fog Source Control Program – Reviews & Inspections
The City Environmental Services Division developed a Food Service Establishment (FSE) FOG awareness and outreach activity to prevent FOG related spills. This activity involves visiting FSE in the City and distributing and explaining the FSE FOG Control Program Information kit. This kit is a trainingmodule designed for teaching FSE owners and employees about the proper disposal of FOG.

7.1.1 PUBLIC EDUCATION/OUTREACH
Public education and outreach remains an integral element of the FSE FOG Control Program. Outreach is provided to FSE staff and management. Public education of the general public is also a core element in the FOG GO SSMP Element 7.

The Sewer System Management Plan must include procedures for the evaluation of the Enrollee’s service area to determine whether a sewer pipe blockage control program is needed to control fats, oils, grease, rags and debris. If the Enrollee determines that a program is not needed, the Enrollee shall provide justification in its Plan for why a program is not needed.

The procedures must include, at minimum:
• An implementation plan and schedule for a public education and outreach program that promotes proper disposal of pipe-blocking substances;
• A plan and schedule for the disposal of pipe-blocking substances generated within the sanitary sewer system service area. This may include a list of acceptable disposal facilities and/or additional facilities needed to adequately dispose of substances generated within a sanitary sewer system service area; • The legal authority to prohibit discharges to the system and identify measures to prevent spills and blockages;
• Requirements to install grease removal devices (such as traps or interceptors), design standards for the removal devices, maintenance requirements, best management practices requirements, recordkeeping and reporting requirements;
• Authority to inspect grease producing facilities, enforcement authorities, and whether the Enrollee has sufficient staff to inspect and enforce the fats, oils, and grease ordinance; • An identification of sanitary sewer system sections subject to fats, oils, and grease blockages and establishment of a cleaning schedule for each section; and Implementation of source control measures for all sources of fats, oils, and grease reaching the sanitary sewer system for each section identified above. 288
Element 7 Sewer Pipe Blockage Control Program
June 2025 7-2 Sewer System Management Plan
City of West Sacramento
program and spill programs. Information can be accessed at: City of West Sacramento/FOG | City of West Sacramento. Information such as where the public can drop off their grease and cooking oil is available. In addition, the City has a “No Wipes in Pipes campaign to reduce sewage restrictions from masks, paper products, and other wipes.

7.1.2 APLAN AND SCHEDULE FOR THE DISPOSAL OF PIPE-BLOCKING SUBSTANCES The City provides for year-round collection and recycling of residential cooking oil and grease. The availability of this collection bin is advertised quarterly in the City’s publication called City Lights and as a footer on its sewer bills.

The collection bin is serviced by a local rendering company. The City prioritizes ‘hot spots’ for cleaning known problem areas in their cleaning schedule.

7.1.3 THE LEGAL AUTHORITY
Municipal Code 13.09, the City has legal authority to prohibit FOG discharges to the wastewater collection system, to establish requirements for grease removal devices, to inspect FOG producing facilities, and to carry out enforcement actions.

7.1.4 REQUIREMENTS TO INSTALL GREASE REMOVAL DEVICES
The City also requires, in Municipal Code Section 13.09.09, that an interceptor shall be installed at businesses where FOG is generated

7.1.5 INSPECTIONS
The City Environmental Services Division developed a Food Service Establishment (FSE) FOG awareness and outreach activity to prevent FOG related spills. This activity involves visiting FSE in the City and distributing and explaining the FSE FOG Control Program Information kit.

7.1.6 AN IDENTIFICATION OF SANITARY SEWER SYSTEM SECTIONS The City has identified the gravity sewer mains and laterals that have had recurring, excessive grease in the past.

The City cleans these mains as part of a routine maintenance program primarily to prevent FOG blockages before they occur. The City reviews the results of these practices to determine if FOG mitigation through preventative maintenance is adequate and acceptable

7.2 Implementation
Implementation Plan
Document number of violations given out for improper use of sewer. Quarterly Document public information activities where information is shared with the public. Quarterly 289
Element 7 Sewer Pipe Blockage Control Program
June 2025 7-3 Sewer System Management Plan
City of West Sacramento

7.3 Resilience
Element 7 provides resilience by including providing a outreach program for FSE owners. It informs them and makes them aware that they need to manage what goes down the drain.

7.4 References
The following information was used to develop this Element:
- West Sacramento Municipal Code, Title 13 Chapter 9.
- California Integrated Water Quality System(CIWQS) SSO Report as of July 5, 2016 290
June 2025 8-1 Sewer System Management Plan
City of West Sacramento
Element 8
8 System Evaluation, Capacity Assurance and Capital
Improvements

8.1 System Evaluation and Condition Assessment
GO SSMP Element 8.

The Plan must include procedures and activities for:
• Routine evaluation and assessment of system conditions; • Capacity assessment and design criteria;
• Prioritization of corrective actions; and
A capital improvement plan.

GO SSMP Element 8.1.

Plan must include procedures to:
• Evaluate the sanitary sewer system assets utilizing the best practices and technologies available; • Identify and justify the amount (percentage) of its system for its condition to be assessed each year; • Prioritize the condition assessment of system areas that:
o Hold a high level of environmental consequences if vulnerable to collapse, failure, blockage, capacity issues, or other system deficiencies;
o Are located in or within the vicinity of surface waters, steep terrain, high groundwater elevations, and environmentally sensitive areas;
o Are within the vicinity of a receiving water with a bacterial-related impairment on the most current Clean Water Act section 303(d) List;
• Assess the system conditions using visual observations, video surveillance and/or other comparable system inspection methods;
• Utilize observations/evidence of system conditions that may contribute to exiting of sewage from the system which can reasonably be expected to discharge into a water of the State; • Maintain documents and recordkeeping of system evaluation and condition assessment inspections and activities; and
Identify system assets vulnerable to direct and indirect impacts of climate change, including but not limited to:
sea level rise; flooding and/or erosion due to increased storm volumes, frequency, and/or intensity; wildfires; and increased power disruptions.
291
Element 8 System Evaluation, Capacity Assurance and Capital Improvements June 2025 8-2 Sewer System Management Plan
City of West Sacramento
The requirement is Element 8.1 are contained in the 2024 Sewer Master Plan for the City of West Sacramento (Appendix F). Evaluation and capacity assessment of the City’s wastewater collection system has been prepared over the years and can be found in the following master plans:

I. Sewer Master Plan, 2024
a. Existing System and Land Use
b. System Performance Criteria
c. Planning Scenarios
d. Hydraulic Model Update and Calibration
e. Dry and Wet Weather flow Projections
f. Existing System Evaluation
g. Future System Evaluation
h. Asset Management Plan
i. Capitol Improvement Program
II. Sewer Master Plan, 2015
a. Description of the existing wastewater collection system b. Development of loads for dry weather and wet weather flows c. Evaluation of dry weather and wet weather flow projections d. Analysis of existing and future system capacity
e. Recommended asset management and capital improvement program III. Wastewater Master Plan and Connection to the Lower Northwest Interceptor, April 2003
a. Existing and future land use as developed with the City’s General Plan Update (2000)
b. Studymethodology used to analyze land use, estimate wastewater flows, and assess system capacity
c. Existing and projected flows for current and future levels of development d. A detailed description of the existing gravity sewers, pump stations, and force main systems
e. Regulatory requirement
f. Recommended sewermaintenance and rehabilitation and replacement projects g. Recommended wastewater pump station and force main modifications h. Programcosts, implementation schedule, and financing plan IV. Southport Sanitary Sewer Master Plan, April 2003
a. Land use and flow development
b. Connections to the SRCSD system
c. Detailed evaluation of sewer basins
d. Interimservice plan
e. Preliminary construction cost opinion
292
Element 8 System Evaluation, Capacity Assurance and Capital Improvements June 2025 8-1 Sewer System Management Plan
City of West Sacramento

8.2 Capacity Assessment and Design Criteria
In the 2024 Sewer Master Plan, the City used a model that was originally developed in the 2017 Master Plan, and updated with the latest GIS data, as-built information, and field data collected in 2023. Such information includes inspection spill history, and other data. Additionally, the hydraulic parameters for the City’s pump and list stations were revised to reflect current conditions, including updated to recently replaced facilities. To calculate sewer loads, the wastewater service area was divided into 266 sub-catchments. Wastewater flows were categorized into base wastewater flow (BWF), rainfall-dependent inflow and infiltration (RDII), and groundwater infiltration (GWI) and assigned to each node in the hydraulic model.

To calibrate the model, flow monitoring was performed at 8 sites over 48 days from January 6, 2023, to February 22, 2023, at 15-minute intervals. Precipitation data was downloaded from four Weather Underground stations at GO SSMP Element 8.2.

The Plan must include procedures to identify system components that are experiencing or contributing to spills caused by hydraulic deficiency and/or limited capacity, including procedures to identify the appropriate hydraulic capacity of key system elements for: • Dry-weather peak flow conditions that cause or contributes to spill events;
• The appropriate design storm(s) or wet weather events that causes or contributes to spill events; • The capacity of key system components; and
• Identify the major sources that contribute to the peak flows associated with sewer spills.

The capacity assessment must consider:
• Data from existing system condition assessments, system inspections, system audits, spill history, and other available information;
• Capacity of flood-prone systems subject to increased infiltration and inflow, under normal local and regional storm conditions;
• Capacity of systems subject to increased infiltration and inflow due to larger and/or higher-intensity storm events as a result of climate change;
• Increases of erosive forces in canyons and streams near underground and aboveground system components due to larger and/or higher-intensity storm events; • Capacity of major system elements to accommodate dry weather peak flow conditions, and updated design storm and wet weather events; and
• Necessary redundancy in pumping and storage capacities. 293
Element 8 System Evaluation, Capacity Assurance and Capital Improvements June 2025 8-2 Sewer System Management Plan
City of West Sacramento
15-minute intervals. For dry weather flow calibration, BWF was developed using industry-standard unit flow factors and GWI was estimated using industry-standard empirical formulas. The unit flow factors, diurnal patterns, and allocations between BWF and GWI were adjusted until the modeled average dry weather flow (ADWF) and peak dry weather flow (PDWF) base wastewater flow (BWF) were within ten percent of measured data in every metered sewer basin. For wet weather flow calibration, RDII was calculated using the rainfall/time/recession (RTK) method.

The Wastewater Planning Users Group (WaPUG) criteria were used to determine a good match between observed and predicted data for peak flow, volume, and depth. The results are incorporated herein in Appendix F.

8.3 Prioritization or Corrective Action
The City’s 2024 City of West Sewer Master Plan Asset Management Plan has been developed and uses a riskbased approach to prioritize necessary improvements and outlines triggers for when maintenance or upgrades are required. The City’s level of service, as established in the 2017 Master Plan, focus on maximizing efficiency, extending infrastructure life, and ensuring regulatory compliance by eliminating spills. Maintenance activities are managed proactively through scheduled repairs and the use of the PMC2000 system to track pump station assets and work orders. This system was updated in the new Master Plan. Additionally, the City is updating its inventory of linear assets and maintenance holes using the GIS registry.

To further enhance the collection system, the City has developed a preventative maintenance program focusing on routine cleaning, inspections, and repairs. A significant effort is underway to clean and inspect gravity mains, with 46.6% of the system already completed since the 2015 Master Plan. The program also includes plans for pump station rehabilitation and force main maintenance. Additionally, the City is addressing a backlog of condition defects in gravity sewers and expanding pump station capacity starting with the South Pump Station Capacity Improvement Project.

8.4 Capital Improvement Plan
GO SSMP Element 8.4.

The capital improvement plan must include the following items:

Project schedules including completion dates for all portions of the capital improvement program; Internal and external project funding sources for each project; and Joint coordination between operation and maintenance staff, and engineering staff/consultants during planning, design, and construction of capital improvement projects; and Interagency coordination with other impacted utility agencies.

GO SSMP Element 8.3.

The findings of the condition assessments and capacity assessments must be used to prioritize corrective actions. Prioritization must consider the severity of the consequences of potential spills. 294
Element 8 System Evaluation, Capacity Assurance and Capital Improvements June 2025 8-3 Sewer System Management Plan
City of West Sacramento
The City prepares an annual list of capital improvement projects that includes projects to address recently identified wastewater collection system capacity issues. Engineering staff prioritize and select the projects to be included on the annual list.

As a part of the 2024 Sewer Master Plan, the City developed a Capital Improvement Project (CIP) to complete rehabilitation and replacement of collection system assets, as identified through the 2015 Sewer Master Plan. The CIP program has not been incorporated to date. It is expected to be considered after a rate study has been conducted to determine which projects can be funded, incorporated into the 2015 CIP. The 2024 Sewer Master Plan contains the list of objects that the City should consider for the CIP. The 2025 Sewer Master Plan is incorporated herein (Appendix F).

8.5 Implementation
Please see the projects listed in the 2024 Sewer Master Plan (Appendix F).

8.6 Resilience
Element 8 builds resilience by assessing sewer capacity, identifying I/I and planning for future CIP that are risk based and hydraulicly assessed.

8.7 References
The following information was used to develop this Element:
• Sewer Master Plan, West Yost Associates, 2015.
• Wastewater Master Plan and Connection to the Lower Northwest Interceptor, April 2003. • Southport Sanitary Sewer Master Plan, April 2003.
295
June 2025 9-1 Sewer System Management Plan
City of West Sacramento
Element 9
9 Monitoring, Measurement and Program

9.1 Performance Measures
Effectiveness of a SSMP element in reducing spill’s will be measured by defining, tracking, and evaluating performance indicators for each appropriate element. Each element in the SSMP is intended to contribute to improving the overall program; to cease spills that can be avoided; to respond to those spills that occur, and to manage materials that are naturally the result of owning and operating a municipal sewer. The indicators that the City will use to measure the performance of its wastewater collection system and the effectiveness of its SSMP are:
• Spills: Total number, Number for each cause (roots, grease debris, pipe failure, capacity, lift station failures, and other), spill rate (#/100 miles/year);
• Portion of sewage recovered compared to total volume spilled; • Volume of spilled sewage discharged to Waters of the State; • Track service (lower) lateral maintenance, separately from gravity mains, for mains, and lift stations; • Track progress on prioritized CIP projects for reducing risks of spills; • Maintain the staffing contact information annually in this SSMP to reflect staffing changes; and • Conduct and implement observations found in the 3-year audits.

GO SSMP Element 9.

The Plan must include an Adaptive Management section that addresses Plan implementation effectiveness and the steps for necessary Plan improvement, including:
• Maintaining relevant information, including audit findings, to establish and prioritize appropriate Plan activities;
• Monitoring the implementation and measuring the effectiveness of each Plan Element; • Assessing the success of the preventive operation and maintenance activities; • Updating Plan procedures and activities, as appropriate, based on results of monitoring and performance evaluations; and
Identifying and illustrating spill trends, including spill frequency, locations and estimated volumes. 296
Element 9 Monitoring, Measurement and Program
June 2025 9-2 Sewer System Management Plan
City of West Sacramento

9.1.1 BASELINE PERFORMANCE
The historical, or baseline, performance is shown separately for gravity mains, lift stations, force mains, and public laterals. Overall, the performance of the system can be documented through the spill rate per 100 miles per year, as shown on Figures 9-1. The City maintained an averaged (mean) spill rate of 1.9 spills per 100 miles per year between 2007 and 2015 and 2.1 for the years 2015 to 2023 (Figure 9-1). As such, the rate has remained fairly stable.

Figure 9-1
Number of Spills (SSOs) per 100 Miles
The 2025 SSMP audit included in Appendix C includes much more monitoring and metrics of the program. The City will evaluate the performance of its wastewater collection system at least annually using the performance measures identified in this Element. The City will update the data and analysis at the time of the evaluation and will place the annual performance report in Appendix D of the SSMP.

The City may use other performance measures in its evaluation. The City will prioritize its actions and initiate changes to this SSMP, its operations and maintenance practices, and any related programs based on the results of the evaluation. This will be done as part of the annual self-audit.

9.2 Implementation
Implementation of this element consists of following those performance measures listed a bullets in Sub-element

9.1. 9.3 Resilience
Element 9 fosters resilience by requiring the City to monitor its progress using its own metrics. This will help to improve the program.
297
Element 9 Monitoring, Measurement and Program
June 2025 9-3 Sewer System Management Plan
City of West Sacramento

9.4 References
The following information was used to develop this Element:
• Sewer System Management Plan Audit for the 3-Year Audit Period Ending August 2, 2024, Black &Veach 2025
298
June 2025 10-1 Sewer System Management Plan
City of West Sacramento
Element 10
10 Internal Audits

10.1 Audits
The City will audit its implementation and compliance with the provisions of this SSMP every three years as required by the WDR. The audit will be conducted and completed no later than every three years following original adoption by the City Council. The audit will be conducted by a team consisting of City Staff selected from the Public Works Department. The audit team may include members from other departments of the City, outside agencies, or contractors. It is also recommended that an audit of the City’s Spill files occur to assure that that the files are complete, contain all required records as stated in the MRP and that the files contain no extraneous or conflicting documents that are not adequately reviewed and explanations provided be conduct.

The results of the audit, including the identification of any deficiencies and the steps taken or planned to correct deficiencies will be included in an Audit Report. Upon completion of the audit, the City will include a copy of the Final Audit Report in the updated SSMP and file the audit with the State Water Resources Control Board using the CIWQS Sanitary Sewer System Database. Modifications and changes to the SSMP will be identified and tracked in
Appendix D.

The audit may contain information about successes in implementing the most recent version of the SSMP, and identify revisions that are needed for a more effective program. Information collected can be used in preparing the audit. Tables and figures or charts can be used to summarize information about these indicators. An explanation of the SSMP development, and accomplishments in improving the sewer system, should be included in the audit, including:
• How the sewer system agency implemented SSMP elements since the last audit; • The effectiveness of implementing SSMP elements;
• A description of the additions and improvements made to the sanitary sewer collection system in the past reporting year; and
GO SSMP Element 10.

The Plan shall include internal audit procedures, appropriate to the size and performance of the system, for the Enrollee to comply with section 5.4 (Sewer System Management Plan Audits) of this General Order. 299
Element 10 Internal Audits
June 2025 10-2 Sewer System Management Plan
City of West Sacramento
• A description of the additions and improvements planned for the upcoming reporting year with an estimated schedule for implementation.

10.2 SSMP Updates
The City will recertify its SSMP at least every six years from City Council adoption and approval or when substantial changes are made in the SSMP. The City will determine the need to update its SSMP more frequently based on the results of the audits and the performance of its wastewater collection system using information from the Monitoring and Measuring Program in Element IX. In the event that the City decides that an update is warranted, the process to complete the update will be identified, assigned to certain staff and include a schedule for completion. The City will complete the update and take the revisions to the City Council for discussion and approval.

Next Internal Audit is due Aug. 2 2028.

10.3Resilience
Element 10 requires the City to conduct audits. Audits build resiliency by ensuring compliance and indicating what can be improved. This will result in fewer spills, less escaped sewage, and faster cleanups. 300
June 2025 11-1 Sewer System Management Plan
City of West Sacramento
Element 11
11 Communication Program

11.1Communication During SSMO Development and Implementation The City maintains a website (www.cityofwestsacramento.org) to inform the public about City activities. The City’s website is an effective communication channel for providing alerts and news to the public. The website provides important announcements, public hearing notices, links to agendas and minutes for City Council meetings, and other key information for City residents. The City will publish the most up-to-date SSMP on the City website.

Other information provided upon request to interested parties includes: brochures and materials regarding collection system operations and maintenance and contact information and/or opportunities for input into the implementation process. The City will also have brochures and information on collection system programs at various department counters in the City as well as available on the City website.

GO SSMP Element 11.

The Plan must include procedures for the Enrollee to communicate with:
• The public for:
o Spills and discharges resulting in closures of public areas, or that enter a source of drinking water, and
o The development, implementation, and update of its Plan, including opportunities for public input to Plan implementation and updates.
• Owners/operators of systems that connect into the Enrollee’s system, including satellite systems, for:
o System operation, maintenance, and capital improvement-related activities. 301
Element 11 Communication Program
June 2025 11-2 Sewer System Management Plan
City of West Sacramento

11.2Communication with Regional San
Regional San developed and implemented a communications program with its four contributing agencies, including West Sacramento. Regional San holds meetings with representatives from contributing agencies on an as-needed basis to discuss common issues and provide support during the SSMP implementation process. This program is described in the SSMP for Sacramento Regional County Sanitation District, which is included at www.regionalsan.com.

Regional San and West Sacramento also have policies in place for spill coordination, which are documented in the operating agreement between Regional San and the City:

When an spill is reported, the agency receiving the notification will assign an Incident Responder. The Incident Responder will investigate the spill and take all appropriate steps to respond in accordance with that agency’s Spill Standard Operating Procedures. If it is known that the other agency is the responsible party, a transfer of the incident will be formally made.

11.3 Implementation
Impementation Plan
Track Events where the public was educated with
information Annually
Track events where the City reached out to
commercial FOG producers Annually

11.4Resilience
Element 11 is how the City will foster communication. Communication to commercial establishments and the public will foster a better understanding and help the City run a better program.

11.5References
The following information was used to develop this Element:
•SSMP for Sacramento Regional County Sanitation District Interceptor System, January 2018. •Wastewater Operating Agreement Between the Sacramento Regional County Sanitation District and the City of West Sacramento, 2013.
302

APPENDICES
303
Appendix A

SEWER SYSTEM MAPBOOK
304
305
306
307
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330
331
332
333
334
335
336
337
338
339
Appendix B

SANITARY SEWER OVERFLOW RESPONSE PLAN
340
City of West Sacramento
Department of Public Works
Sanitary Sewer Overflow Response Plan
For the City of West Sacramento’s
Sanitary Sewer Collection System
341
City of
West Sacramento
Sanitary Sewer Overflow (SSO)
Response Plan
December 2008
Revised January 2015
Prepared for:

City of West Sacramento
Public Works Department
1951 South River Road
West Sacramento, CA 95691
Prepared by:

City of West Sacramento
Environmental Services Division
1110 W Capitol Avenue.

West Sacramento, CA 95691
342
City of West Sacramento
SSO Response Plan
Contents
Term Definition v
Term Definitions v
Section 1 Introduction 1

1.1 Introduction 1

1.2 Sewer System Management Plan 1

1.3 Purpose 1

1.4 Distribution of SSORP 2

1.5 Training 2
Section 2 Internal Notification 3

2.1 Receipt of SSO Notification 3

2.2 Communication Center 5
Section 3 SSO Category Description, Notification and Reporting Requirements 6

3.1 Category 1 SSO 6

3.2 Category 2 SSO 6

3.3 Category 3 SSO

3.4 Private Lateral SSO 7

3.5 Construction Related SSO 7
Section 4 Notification, Response and Reporting Procedures 8

4.1 Procedures 8

4.2 Description of Responsibilities 12

4.3 Signage 14

4.4 Downstream Contact Information 14
Section 5 Impact Mitigation 15

5.1 Standard Operating Procedures 15

5.2 Collection System Failures 15

5.3 Discharges to Storm Drains or Surface Waters 15

5.4 Traffic and Crowd Control 16

5.5 Cleanup 16

5.6 Public Interaction 16

5.7 Media Notification 16

5.8 Residential Claims 16
List of Figures
Figure 4-1 Non-Construction Related SSO Notification, Response and Reporting Procedures Figure 4-2 Suspect Category 1 SSO Notification, Response and Reporting Procedures Figure 4-3 Construction Related SSO Notification, Response and Reporting Procedures List of Tables
Table 2-1 Internal Contact Information
Table 2-2 Communication Center Staff
Table 2-3 Downstream Water Purveyors
343
City of West Sacramento
SSO Response Plan
Appendices
Appendix A SSO Standard Operating Procedure
Appendix B SSO Clean up and Remediation Standard Operating Procedure Appendix C SSO Flow Estimation Methods
Appendix D SSO Sampling Procedure
Appendix E SSO Report
Appendix F List of Septage Haulers
344
Glossary
City of West Sacramento Page v
SSO Response Plan
Term Definitions
Category 1 SSO: Discharges of untreated or partially treated wastewater of any volume resulting from a City sanitary sewer system failure or flow condition that:
a) Reach surface water and/or reach a drainage channel tributary to a surface water; or b) Reach a MS4 and are not fully captured and returned to the sanitary sewer system or not otherwise captured and disposed of properly. Any volume of wastewater not recovered from the MS4 is considered to have reached surface water unless the storm drain system discharges to a dedicated storm water or groundwater infiltration basin (e.g., infiltration pit, percolation pond).

Category 2 SSO: Discharges of untreated or partially treated wastewater greater than or equal to 1,000 gallons resulting from a City sanitary sewer system failure or flow condition that does not reach a surface water, a drainage channel, or the MS4 unless the entire SSO volume discharged to the storm drain system is fully recovered and disposed of properly.

Category 3 SSO: All other discharges of untreated or partially treated wastewater resulting from the City’s sanitary sewer system failure or flow condition.

Composite Sample: A collection of individual samples obtained at regular intervals.

Grab Sample: A single sample collected at a particular time and place which represents the composition of the wastewater at that particular time and place.

Lateral: A sewer branch line that reaches from the main sanitary sewer line to individual properties/buildings.

OES: Office of Emergency Services
Private Lateral SSO: Sewage discharges that are caused by blockages or other problems within a privately owned sanitary sewer lateral.

Potable Water: Water that does not contain objectionable pollution, contamination, minerals, or infective agents and is considered satisfactory for drinking.

Purveyor: An agency or person that supplies water (usually potable water).

RWQCB: Regional Water Quality Control Board
SSO: Sanitary Sewer Overflow, any overflow, spill, release, discharge or diversion of untreated or partially treated wastewater from a sanitary sewer system. 345
Introduction
City of West Sacramento Page 1
SSO Response Plan
Section 1 Introduction

1.1 Introduction
On May 2, 2006, the State Water Resources Control Board (SWRCB) adopted Order No. 2006-0003- DWQ (Order). The Order requires all federal and state agencies, municipalities, counties, districts, and other public entities (Enrollees) that own or operate sanitary sewer systems greater than one mile in length that collect and/or convey untreated or partially treated wastewater to a publicly owned treatment facility in the State of California to comply with the Statewide General Waste Discharge Requirements (WDR). The WDR outlines requirements for Enrollees to ensure that a system-wide operation, maintenance, and management plan is in place to reduce sanitary sewer overflows (SSOs) within the state.

In September 2013, the Monitoring and Reporting Program (MRP), which is Attachment A to the Order, was amended. The revisions have been incorporated into the City’s SSO Response Plan.

Major causes of SSOs include: grease blockages, root blockages, sewer line flood damage, manhole structure failures, vandalism, pump station mechanical failures, power outages, excessive storm or ground water inflow/infiltration, debris blockages, sanitary sewer system age, construction material failures, lack of proper operation and maintenance, insufficient capacity and contractor-caused damages. Many SSOs are preventable with adequate and appropriate facilities, source control measures, and effective operation and maintenance of the sanitary sewer system.

1.2 Sewer System Management Plan
Under the WDR each Enrollee must develop and implement a Sewer System Management Plan (SSMP). The SSMP must include provisions to provide proper and efficient management, operation, and maintenance of the sanitary sewer systems. Additionally, the SSMP must contain a Sanitary Sewer Overflow Response Plan (SSORP) that establishes standard procedures for immediate response to an SSO in a manner designed to minimize water quality impacts and potential nuisance conditions.

Elements of the SSORP include: proper internal notification procedures, appropriate response to all overflows, procedures to ensure prompt notification to appropriate regulatory agencies and other potentially affected entities, procedures to ensure that appropriate staff and contractor personnel are aware of the SSORP and are appropriately trained. Procedures to address emergency operations such as traffic and crowd control and a program to ensure that all reasonable steps are taken to contain and prevent the discharge of untreated and partially treated wastewater to waters of the United States and to minimize or correct any adverse impact on the environment resulting from an SSO.

1.3 Purpose
The purpose of the SSORP is to satisfy the requirements of the WDR. The ultimate purpose of the SSORP is to provide procedures to effectively manage the response and the remediation of an SSO when it occurs in an effort to protect public health as well as the environment. 346
Introduction
City of West Sacramento Page 2
SSO Response Plan

1.4 Distribution of SSORP
This SSORP covers procedures for responding to SSOs within the City of West Sacramento to minimize the adverse effects on water quality and beneficial use. Updates reflecting changes in policies, procedures and contacts may be made as needed to achieve the objectives of this plan.

Copies of this plan will be distributed to the following city personnel:

Public Works Director
Community Development Director
Public Works Operations Manager
Supervising Senior Civil Engineer
Senior Civil Engineer
Engineering Assistant
Engineering Technician
Utility Maintenance Superintendent
Utility Maintenance Staff
Maintenance Superintendent
Treatment Plant Mechanics; Electricians
Public Works Administrative Staff
Environmental Services Division Manager
Environmental Services Division (ESD) Staff
Fire Department
Police Department

1.5 Training
The City of West Sacramento’s Public Works Department ESD will schedule and document training sessions for applicable city staff as needed to assist in the awareness of the policies and procedures contained within this SSORP and to ensure that the various personnel involved are aware of their responsibilities and duties.
347
Internal Notification
City of West Sacramento Page 3
SSO Response Plan
Section 2 Internal Notification

2.1 Receipt of SSO Notification
SSOs can be detected by city personnel, construction contractors or the public. During normal working hours, Monday through Friday from 8:00 am to 4:30 pm, the public can call the Public Works department at (916) 617-4850 to report SSOs. After hours the Public Works phone system redirects incoming phone calls to the Dispatch Center or this center can be called directly at (916) 372-3375.

Once the initial call is made reporting the SSO, the report is dispatched to the Chief Utility Maintenance Worker during normal working hours or to the On-call Utility Maintenance Worker afterhours for response. The responding employee is responsible for determining whether additional city personnel are necessary to aid in containment, clean-up and remediation. Refer to Table 2-1 for internal contact information.

If an SSO occurs within the portion of the sanitary sewer collection system maintained and operated by the Sacramento Regional County Sanitation District contact Sacramento County Central at (916) 875-5000.
348
Internal Notification
City of West Sacramento Page 4
SSO Response Plan
Table 2-1 Internal Contact Information
Administrative
Title Name Office Number Cell Number
City Manager Marty Tuttle (916) 617-4500
Public Works Director Denix Anbiah (916) 617-4596
Community
Development Director Charline Hamilton (916) 617-4559
Public Works
Operations Manager VACANT
Engineering
Supervising Senior
Civil Engineer Mark Collier (916) 617-4657
Senior Civil Engineer Wendy Williams (916) 617-4677
Engineering Assistants
Patty Maisch (916) 617-4666
Dennis Regaller (916) 617-4670
Construction Inspectors VACANT
Steve Gunn (916) 617-4662 (916) 205-2223
Engineering Technician Rotimi Coker (916) 617-4701
Utilities Maintenance
Utilities Maintenance
Superintendent VACANT
Chief Maintenance
Workers
Frank Dorris (916) 617-4836 (916) 747-0331
Danny Valencia (916) 617-4835 (916) 799-2699
On-Call Utility Worker On-Call Utility Worker (916) 799-4530 Maintenance
Maintenance
Superintendent Tim Spinelli (916) 617-4822
Treatment Plant
Mechanics (SCADA)
John Waterman
(916) 617-4820 On-Call
(916) 799-3969
Jon Witmer
Alex Semenuk
James Gray
Water Services Operations
Water Treatment Plant
Superintendent Chris Kania (916) 617-4870 (805) 610-2637 Chief Plant Operator Juan HernandezHerrera (916) 617-4863 (707) 365-3541 On-Call Operator On-Call Operator (916) 617-4860 (916) 799-6647 Instrumentation
Technician (SCADA) Tesco Controls (916) 395-8800
Environmental Program Division
Environmental Services
Manager Paulina Benner (916) 617-4586 (530) 400-6735
Administrative Analysts
– Environmental Svcs.

Susan Strand (916) 617-5031
Ryan Burnett (916) 617-5025
349
Internal Notification
City of West Sacramento Page 5
SSO Response Plan
Table 2-1 Internal Contact Information (cont)
Police Department
Name Office Number
Non-Emergency Dispatch (916) 372-3375
Administration (916) 617-4900
Fire Department
Non-Emergency Dispatch (916) 372-3375
Station 41 (916) 617-4741
Station 42 (916) 617-4742
Station 43 (916) 617-4743
Station 44 (916) 617-4744
Station 45 (Administration) (916) 617-4745

2.2 Communication Center
The City’s Public Works Department will be responsible for establishing a communication center in the event of a Category 1 SSO. The communication center will consist of one of the Public Works employees listed in Table 2-2 stationed at a predetermined location within the Public Works Administration building. The communication center will be the direct line of communication with outside regulatory and emergency agencies as well as responding city crews.

Table 2-2 Communication Center Staffing
Utilities Maintenance Superintendent
Chief Utilities Maintenance Worker
Public Works Senior Clerk
350
SSO Category
City of West Sacramento Page 6
SSO Response Plan
Section 3 SSO Category Description, Notification and
Reporting Requirements

3.1 Category 1 SSO
Description: Discharges of any volume resulting from the failure of the City’s sanitary sewer system or flow condition that:
• Reach surface water and/or reach a drainage channel tributary to a surface water; or
• Reach a MS4 and are not fully captured and returned to the sanitary sewer system or not otherwise captured and disposed of properly. Any volume not recovered from the MS4 is considered to have reached surface water.

Notification: For any Category 1 SSO of greater than or equal to 1,000 gallons, City staff will notify California Office of Emergency Services (Cal OES) and obtain a control number, as soon as possible, but not later than 2 hours after (A) the enrollee has knowledge of the discharge, (B) notification is possible, and (C) notification can be provided without substantially impeding cleanup or other emergency services.

Monitoring: Conduct water quality sampling within 48 hours after initial SSO notification for Category 1 SSOs in which 50,000 gallons or greater are discharged to surface waters.

Reporting: Complete field SSO report form.

Online electronic reporting mandatory on all Category 1 SSOs. • Draft submittal must be reported no later than 3 business days after becoming aware of the discharge.
• Final certification must be made within 15 calendar days of conclusion of the SSO response.
• SSO Technical Report must be submitted within 45 calendar days after the end date of any Category 1 SSO in which 50,000 gallons or greater are discharged to surface waters.

3.2 Category 2 SSO
Description: Discharges greater than or equal to 1,000 gallons resulting from the failure of the City’s sanitary sewer system or flow condition that:
• Do not reach surface water, a drainage channel, or a MS4 unless the entire SSO discharged to the storm drain system is fully recovered and disposed of properly.

Notification: No outside agency notification required on Category 2 SSOs.

Reporting: Complete field SSO report form.

Online electronic reporting mandatory on all Category 2 SSOs. • Submit draft report within 3 business days of becoming aware of the SSO and certify within 15 calendar days of the SSO end date.
351
SSO Category
City of West Sacramento Page 7
SSO Response Plan

3.3 Category 3 SSO
Description: All other discharges of wastewater resulting from the failure of the City’s sanitary sewer system.

Notification: No outside agency notification required on Category 3 SSOs.

Reporting: Complete field SSO report form.

Online electronic reporting mandatory on all Category 3 SSOs. • Submit certified report within 30 calendar days of the end of the month in which the SSO occurred.

3.4 Private Lateral SSO
Description: Sewage discharges that are caused by blockages or other problems within a privately owned lateral.

Notification: No outside agency notification required on Private Lateral SSOs, unless SSO is greater than or equal to 1,000 gallons that has or may result in a discharge to surface water (See SSO SOP Appendix A).

Reporting: Complete field SSO report form.

Online electronic reporting at the discretion of the City.

3.5 Construction Related SSO
Description: The WDR specifies that “temporary storage and conveyance facilities (such as vaults, temporary piping, construction trenches, wet wells, impoundments, tanks, etc) are considered to be part of the sanitary sewer system, and discharges into these temporary storage facilities are not considered to be SSOs”.

Notification: No outside agency notification required on Construction Related SSO’s, that is contained within trenches or temporary structures.

Reporting: Complete field SSO report form.

Online electronic reporting at the discretion of the City if not Category 1, 2, or 3 SSO. 352
SSO Category
City of West Sacramento Page 12
SSO Response Plan
Section 4 Notification, Response and Reporting Procedures

4.1 Procedures
The procedures listed in Figures 4-1 and 4-2 will aid in providing an appropriate response to SSOs.

For additional information regarding SSO clean-up, sampling and flow estimation, please see the Appendix section of this plan.
353
SSO Category
City of West Sacramento Page 12
SSO Response Plan

4.2 Description of Responsibilities
Public Works Clerk / Secretary Receive initial call and dispatch staff for response Staff communication center
On-Call Utility Maintenance Worker Provide initial response for after hour calls.

Investigate and assess SSO
Contact additional staff for assistance
Correct cause
Contain SSO
Post signs
Clean-up
Update communication center
Utility Maintenance Worker Investigate and assess SSO
Contact additional staff for assistance
Correct cause
Contain SSO
Post signs
Clean-up
Update communication center
Chief Utility Maintenance Worker Dispatch response staff Investigate and assess SSO
Direct response staff
Communicate with City Divisions
SSO documentation
Correct cause
Contain SSO
Initiate SSO report requirements
Clean-up
Update communication center
Submit SSO field report
Engineering Construction Work with contractor on construction related SSOs Management Staff Update communication center
Utility Maintenance Superintendent Confirm Category 1 SSO Direct staff
Update communication center
Staff communication center
Direct staff
Update communication center
On-Call Treatment Plant Mechanic Operation of sanitary/storm pump stations SCADA
Update communication center
354
SSO Category
City of West Sacramento Page 13
SSO Response Plan
Public Information Officer (PIO) Issues news release
Media notification
Public Works Operations Manager Determine whether drinking waters are impacted from SSO Provide information to PIO/City Manager/Public Works and Community Development Director
West Sacramento Fire Department Provide boat
Emergency response
West Sacramento Police Department Traffic and crowd control Environmental Services Manager Review SSO field reports Complete and certify electronic SSO reports
Preparation of additional requirements involving SSO
Coordinate with Yolo County Environmental Health
Direct sampling operations as necessary
Finalize Report
Environmental Program Specialist Provide requested information on SSO Collect / analyze samples
Route samples for analyses
Initiate SSO electronic report requirements
Finalize Report
355
SSO Category
City of West Sacramento Page 14
SSO Response Plan

4.3 Signage
Contamination warning signs shall be posted at SSO sites when the SSO is in a public area and/or enters a waterway, or based on requirements issued by outside regulatory agencies, until the site is determined to be cleaned. Contamination warning signs shall be posted by Utility Maintenance personnel and by the contractor if the SSO is construction related. The warning signs serve to provide a warning of potential health risks due to sewage contamination. If signage is required the Public Works Manger shall notify the Public Information Officer.

4.4 Downstream Notification
In the event of an SSO discharge to surface water a determination will be made by the Public Works Manager whether drinking water for water purveyors downstream will become impacted. Table 2-3 identifies downstream water purveyors. If necessary, contact should be made and information regarding the SSO relayed.

Table 2-3 Downstream Water Purveyors
Purveyor Name Phone Number
City of Rio Vista Greg Malcolm
(707) 249-7506
Solano County Water
Agency
Main: (707) 451-6090
or Thomas Pate
(707) 249-4097
Contra Costa Water
District
Main (925) 688-8374
Freeport Water Vickie Butler
(916) 203-0923
356
Impact Mitigation
City of West Sacramento Page 15
SSO Response Plan
Section 5 Impact Mitigation

5.1 Standard Operating Procedures
When an SSO occurs, all feasible steps must be taken to prevent impacts including controlling or limiting the amount of wastewater to the storm drain system, terminating the discharge and recovering and properly disposing of as much of the SSO as possible including wash down water that is used. Standard Operating Procedures (SOPs) have been developed and implemented covering cleanup and remediation of SSOs. These SOPs are found in the Appendix section of this Plan.

5.2 Collection System Failures
In the event of a failure on a sewer main line, sewer forced main, pump station or any other portion of the sanitary sewer collection system, it may be necessary to notify upstream industrial dischargers of the situation and request that they reduce their sewer discharge. Additionally, some sanitary sewer pump stations are fed by other sanitary sewer pump stations within the system. Should this be the case, upstream pump stations will need to be turned off so repairs can be completed. Continuous monitoring of pump station wet well levels shall be conducted to ensure that the capacity is sufficient for the time the pump station is off. Large failures may require an extended amount of time for repair.

Bypass pumping (manhole to manhole) and/or mobile sewage collection may be necessary with prolonged repair. If necessary, City staff will coordinate with commercial septage haulers for assistance. See Appendix G for listing of septage haulers.

5.3 Discharges to Storm Drains or Surface Waters
If an SSO has entered or is entering a storm drain, steps should be taken to prevent further discharge from entering and isolate the impacted portion of the storm drain system to prevent the wastewater from reaching a waterway. It may be possible to isolate the SSO by switching storm water pumps off.

The contained wastewater can then be collected and discharged back into the sanitary sewer system.

Once an SSO reaches surface waters it might not be possible to contain and remove the wastewater.

Focus should be made on limiting the amount entering the surface waters, debris removal and sampling to determine the extent of the contamination.

Procedures for responding to SSO discharges to storm drains or surface waters can be found in Appendix B. The sampling SOP can be found in Appendix D. 357
Impact Mitigation
City of West Sacramento Page 16
SSO Response Plan

5.4 Traffic and Crowd Control
Traffic and crowd control measures vary based on the size of the SSO and its location. When appropriate, local police, fire department and other city personnel should be notified and requested to assist in traffic and crowd control.

5.5 Cleanup
SSO sites must be thoroughly cleaned after the SSO such that no identifiable residue remains, such as rags, sewage solids and other debris. Solids and debris must be collected and disposed of properly. Several actions must be taken to properly cleanup and mitigate potential effects, including but are not limited to:
• Application of absorbent material;
• Removal of contaminated soil and used absorbent;
• Flushing the SSO site with relatively clean water;
• Return of all wash-down water to the sanitary sewer.

5.6 Public Interaction
The public may be present during an SSO. Access to the affected area should be restricted to authorized personnel only. Efforts should be made to warn the public as to the dangers of coming into contact with raw sewage (see Section 4.3 Signage).

5.7 Media Notification
If necessary, when public health could be affected the City’s PIO will issue a news release related to the SSO.

5.8 Residential Claims
If an SSO in the City’s maintained system resulted in a flooded home or structure the City’s insurance carrier will be the lead on any claims.
358
Appendix A
Sanitary Sewer Overflow
SOP No: EPD-1

Page 1 ends

Issued: 11-9-07
Revised: 9-10-13
Administrative Staff

1. Upon receipt of call, staff shall document applicable information on Work Order form.

2. Staff will dispatch applicable utility crew for response.

Responding Staff

1. Staff responding to the incident shall promptly investigate the cause and stop the sanitary sewer overflow.

Appropriate safety procedures shall be observed.

2. Staff responding should make every attempt to protect storm drain inlets and entrances to waterways from the overflow material.

3. If extra help is necessary, staff should immediately notify their Superintendent or the utility worker in-charge in their absence, and call for extra help (Mechanics, Utility Workers or Environmental Services Staff). The number of extra help depends on the severity of the incident.

4. Staff responding to the incident must complete the Sanitary Sewer Overflow Report (attached). This report will be submitted to the Environmental Services Division no later than 24 hours after the incident. a. In the event that the sewer overflow occurs on a weekend or holiday, the Sanitary Sewer Overflow Report will be submitted to the Environmental Services Division on the next scheduled workday.

Environmental Services Division

1. Once the Sanitary Sewer Overflow (SSO) Report has been received it must be electronically entered into the State Water Resources Control Board’s Sanitary Sewer Overflow database, which is accessed through California Integrated Water Quality System (CIWQS) http://ciwqs.waterboards.ca.gov, based on category of spill.
a. Category 1 spills/overflows must go through “Draft Submittal” (SSO database) within 3 business days after overflow occurred and must be certified (finalized) by the Legally Responsible Official within 15 calendar days of the conclusion of the response and remediation. Upon conclusion, ensure that “Ongoing Investigation” item is correctly answered in the SSO database. An SSO Technical Report must be submitted within 45 calendar days after the end date of any Category 1 SSO in which 50,000 gallons or greater are discharged to surface waters.
b. Category 2 spills/overflows must go through “Draft Submittal” within 3 business days of becoming aware of the SSO and certify within 15 calendar days of the SSO end date. c. Category 3 spills/overflows submit certified report within 30 calendar days of the end of the month in which the SSO occurred.
d. If no spills occurred in the month, a “No Spill Certification” must be completed within 30 days of the end of that month.
e. Private lateral spills may be voluntarily reported to the CIWQS online system. The City is encouraged to report to OES any PLSDs that are equal to or greater than 1,000 gallons that have or may result in a discharge to surface water.

2. Environmental Services Division (ESD) staff will submit a copy of completed reports to the Public Works Manager.

3. ESD staff will file original report in the Sanitary Sewer Overflow binder.

4. After determining the responsible party, (i.e., contractor, engineering, etc.), ESD staff will prepare a letter/invoice to the appropriate party requesting reimbursement of costs incurred by the city.

Utility Superintendent
During SSO event, Superintendent or designee will direct notification to outside agencies when necessary.

Public Works Department
359
Appendix A
Sanitary Sewer Overflow
SOP No: EPD-1

Page 2 ends

Issued: 11-9-07
Revised: 9-10-13
Completion of Sanitary Sewer Overflow Report
Definitions/Instructions as they appear on Report
SSO – Sanitary Sewer Overflow, any overflow, spill, release, discharge or diversion of untreated or partially treated wastewater from a sanitary sewer system.

Estimate Volume of discharge – Total volume of SSO.

Location – Physical address of SSO.

Description – Type of area where SSO is located.

Source – Where is the SSO coming from?
Cause – What was the cause of the blockage?
Route of Flow – Describes the direction of flow and the area(s) that the wastewater flowed over and/or through.

Destination – Final destination, describes the area that the wastewater ultimately reached.

Clean Up /Recovery– Describes procedures, equipment used and estimated volume of recovered material.

Remediation – What was done to correct the SSO? Who did repair/cleared blockage? Who inspected job? Ways to Prevent Recurrence - What can be done to prevent the event from happening again? Was the blockage/problem in the City owned collection system – (e.g., Forced Mains, Lift Stations, etc.) Category 1 SSO – Meets at least one (yes) of the questions listed SSO Category 1 Determination table.

Category 2 SSO – Sewer overflow that does not meet any of the requirements of a Category 1 SSO, but caused by problems in the City owned collection system.

Category 3 SSO – All other discharges of wastewater resulting from the City’s sanitary sewer system.

SSO Volume – Estimated volume, reference item 4 of report. The sum of the three lines should equal the total volume.

Response – What was done to SSO and the cause of SSO?
Samples Taken – If samples are necessary, contact the Environmental Program Division.

Notification – Notify the following individuals/agencies according to the following:

OES – Category 1 overflow of = to or > 1,000 gallons, must be notified within 2 hours of becoming aware of discharge.

Environmental Services Division - As necessary to aid in remediation.

Utility Supervisor – As necessary to aid in remediation and cleanup.

Mechanics – If necessary to shut down sanitary sewer lift station.

RD 900 – If overflowed material reaches canal/ditch/channel that they are responsible for.

Business/Contractor – As necessary to aid in remediation and cleanup.

Public Works Department
360
Appendix B
Sanitary Sewer Overflow
Clean up & Remediation
SOP No: EPD-2

Page 1 ends

Issued: 12-3-08
Revised:

Responding Staff
Dispatch and arrival on scene.

1. Note the time of dispatch and arrival on scene.

2. Upon arrival promptly investigate the cause and stop the sanitary sewer overflow. Appropriate safety procedures shall be observed.
a. Note the start and stop time that the overflow occurred.

3. Contact additional help as necessary to aid the clean up/remediation efforts. a. The Vactor truck(s) should be dispatched immediately. b. If necessary, contact City Mechanics to shut down sanitary sewer pump stations. c. If necessary, contact staff to bring appropriate protection mechanism(s) from Corp Yard.

4. Determine the direction of flow.
a. Determine whether overflow has entered storm drain collection system, ditch or canal. i. Determine the final destination.
b. Install appropriate mechanism to divert or contain the flow to protect storm drain inlets. i. Make every effort to contain overflow above ground
Spill contained above ground
(Streets, Sidewalks, Driveways)

1. Protect public from the area.

2. Immediately begin collecting overflowing/overflowed material with Vactor Truck.

3. Wash down the impacted area.
a. Collect all wash water.
b. Dispose of wash water into sanitary sewer.
(Soil, Equipment)

1. Collect any debris.

2. Wash equipment with bleach solution.
a. Collect wash down water and dispose of into sanitary sewer.

3. Remove or decontaminate contaminated soil/plants.
a. Collect wash down water and dispose of into sanitary sewer.

Public Works Department
361
Appendix B
Sanitary Sewer Overflow
Clean up & Remediation
SOP No: EPD-2

Page 2 ends

Issued: 12-3-08
Revised: 10-14-13
Spill entering/entered storm drain collection system

1. Protect public from the area.

2. Immediately begin collecting overflowing/overflowed material with Vactor Truck.

3. Install mechanism to prevent SSO from further entering storm drains or surface waters.

4. Determine how far downstream the overflowing/overflowed material has reached. a. Once determined, go to next manhole downstream.

5. Turn off storm water pump station(s).
a. This item might not be possible during rain event.

6. Install pipe plugs at the determined downstream location.

7. Collect all material contained within the impacted storm drain collection system.

8. Wash down the impacted area.
a. Collect all wash water with Vactor truck.

9. Once overflow has ceased and clean up is complete remove all plugs and dams used to contain flow.

Spill has entered a waterway

1. Protect public from the area.

2. Make every effort to stop the flow from entering the waterway.

3. Begin collecting the wastewater.

4. Contact the Environmental Services Division.

5. Remove debris.

6. Remove or decontaminate contaminated soil/plants.
a. Collect wash down water and dispose of into sanitary sewer.

7. Place warning signs around the impacted area.

8. Collect water samples for analysis. See sampling guidelines contained within the SSO Response Plan. a. This item will usually be conducted by Environmental Services Staff.

Public Works Department
362
Appendix C
SSO Flow Estimation Methods
Volume of the SSO can be determined using a variety of approaches. The following sections will discuss two methods that are often employed. The person preparing the estimate shall use the method most appropriate to the SSO in question. Every effort shall be made to make the best possible estimate of the volume.

Method 1 Measured Volume
This method can be used on small spills if it is not raining.

Step 1: Sketch the shape of the spill that is contained.

Step 2: Measure the length and width.

Step 3: Measure the depth in several locations.

Step 4: Convert all dimensions to feet.

Feet = inches/12
Step 5: Calculate the area using the following formulas.

Rectangle Area = Length x Width
Circle Area = Diameter x Diameter x 0.785
Triangle = Base x Height x 0.5
Step 6: Multiply the area times the depth to get the volume.

Volume ft3= Area x Depth
Step 7: Multiply the volume by 7.48 gallons/ft3to convert it to gallons.

Gallons = Volume x 7.48 gallons/ft3
Method 2 Duration and Flow Rate
Duration: The duration is the total elapsed time from when the SSO started until it stops.

Flow Rate: The rate at which the SSO is flowing. Usually expressed as gallons per second (GPS) or gallons per minute (GPM) or gallons per hour (GPH).

Open channel flow: Often overflows run into nearby dry ditches or street gutters.

Total volume, gallons, of flow can be quantified by measuring the cross-sectional area and speed of the flow. Measure a set distance paralleling the SSO flow route.

Measure, in inches, the midway width and depth of the flow over this distance. Then measure the time, in seconds, it takes a float to travel the set distance. Record total time of the SSO flow.
363
Appendix C
Calculate the total SSO volume of the following example:

Example: After measuring off a set distance of 20 feet, it was determined that the float took 20 seconds to travel this 20 feet. The width and depth at the midway point of the flow was 28 inches and 3 inches, respectfully. The total time of the SSO flow was 20 minutes. What is the total volume, gallons, of this SSO event? Total Volume (gal) = Velocity (ft/sec) x Area (ft2) x total time (seconds) x 7.48 gal/ ft3 = 20ft/20sec. x (28 x 3)/144) ft2 x (20min. x 60sec. /min.) x 7.48 gal/ ft3
= 1 x 0.58 x 1200 x 7.48 gal
= 5,220 gallons
Pump Stations: SCADA systems can provide flow or pump run time data for sewer and storm water pump stations. Pump curves may need to be obtained to determine flow rates. The flow rates can be used to determine flow volumes. Contact the city’s Treatment Plant Mechanics to obtain SCADA data.

SSO Flow Estimation Pictures (see next page): Provides pictures of sewage flowing from a manhole cover at a variety of flow rates. Observations by the responding utility maintenance crew are used to select the appropriate flow rate from the chart. 364
Appendix C
365
Appendix D
SSO Sampling Procedures Sampling for Coliform
(Total & e Coli), BOD and Ammonia
When sampling a SSO a minimum of three separate sample sets must be collected. One upstream of the discharge location, one at the discharge location and one downstream of the discharge location.

What you will need:

Personnel protective equipment including latex/nitrile gloves and eye protection.

Sub Surface Grab Sampler (used for sampling surface waters) *6 – 100 mL sterile plastic containers for coliform analysis. 3 for samples with 3 extra. *6 -1 Liter Poly containers for BOD. 3 for samples with 3 extra. *6 – 500 mL Poly containers preserved with H2SO4 for Ammonia analysis. 3 for samples with 3 extra.
3 – 1 Liter soda lime bottles
3 – 1 Liter glass jars
3 – funnels
Cooler with ice packs
Chain of Custody
*Ensure that there are adequate amount of sample equipment if known more than three sample locations.

Procedure:

1. Put on all required protective equipment including latex/nitrile gloves and eye protection.

2. Use the 100 mL sterile container for coliform, 1-liter poly container for BOD and 500mL poly container for ammonia.
• Three sets of samples are collected for each incident: up stream, entry point, downstream.
• One set is one 1-liter bottle for BOD, one 100 mL container for coliform, and one 500 mL bottle for Ammonia (preservation with H2SO4 required).. • All samples are grabs and are collected at 6” below the surface. Samples shall be placed in coolers on ice packs during transport to the lab.

3. Once the lid is opened, the inside surface of the bottle or lid should not be touched.

Care should be taken with the sample containers that contain a preservative to keep the preservation in the container.

4. Get into position to collect the sample. Try to collect the sample in the middle of the flow.

5. Once in position,

6. Avoid sampling debris or scum layer from the surface. To avoid this, the surface may need to be agitated before sampling.

7. Use a glass jar for spills and flowing material and use the Sub Surface Grab Sampler when sampling surface waters.

8. Rinse the sample collection container (glass jar, soda lime bottles).

9. Collect sample in sample collection container.

10. Transfer sample from sample collection container to individual sample bottle(s). Leave approximately one inch of head space in individual sample bottles. Do not overfill.

11. Immediately, place all samples on ice and cool to 4⁰C.

12. Complete Chain of Custody form and take samples to contracted environmental laboratory.
366
Appendix E
Date
SSO Category ID #
Latitude Longitude Worker Hours
Called: am pm
Arrived: am pm

1. Est. SSO Start am pm am pm

4. Est. Volume Gals

5. Location: Address

6. Description: o Street o Commercial o Parking Lot
o Other

7. Source: o Manhole
o Other

8. Cause: o Blockage o Grease o Roots o Debris o Other

9. Route of Flow:

10. Destination: o Street o DI o Channel o Surface Water o Building/Private Property o Other

11. Contractor responsible? Y / N Name:

13. Remediation:

Yes No

15. Was the blockage / problem in the City owned collection system? o o Direction of flow and areas spill flowed
over or through.
o Residential o Intersection
o Ground
 Continue on back. 
o Cleanout o Pump Station
Sanitary Sewer Overflow (SSO) Report
Environmental Services Use Only

2. Est. SSO Stop
Equipment Hours
Work Order No.
o Apartment

3. Est. Duration of SSO
Dimensions L _________ W ___________ D __________

14. Ways to Prevent Recurrence:

Address/ Phone
Describes where spill was when
cleaned up/ or its final destination.

12. Clean Up / Recovery
(Actions):

Spill appearance
point(s)
367
Yes No
o o
Was the discharge 1,000 gallons or greater to surface waters? o o o o

16. SSO Volume: to surface water Gallons
to storm drain/drainage channel Gallons
not recovered from storm drain/drainage channel Gallons

17. Response:
o Contained o Returned All/Part of SSO to Sanitary Sewer o Other

18. Samples taken? Y / N Samples only required for Cat 1 spills 50,000 gallons or more Left
Contacted Message Initial
o * Date: Time: o
Control #:
o Date: Time: o
o Date: Time: o
o Mechanics Date: Time: o
Date: Time:
o Date: Time: o
Prepared by (print & sign your name): Date:

Spills of 1,000 gallons or more require OES notification within 2 hours (see number below).

SSO Category 1 Determination
Was there a discharge to surface water?
Was the discharge 50,000 gallons or greater to surface waters? Was there a discharge to a storm drain/RD-900 drainage channel that was not fully captured and returned to the sanitary sewer system? o o o Cleaned Up
(916) 371-1483
Please check all
boxes that apply
o Inspected to Determine Cause (CCTV)
Send this report to Environmental Services Division within 24 hours.

Env. Services Division
Utility Supervisor
o Restored Flow
o

19. Notification: (* If category 1 SSO, agency notification required) OES
RD - 900
(916) 799-3890
Business/Contractor
o
(916) 617-4590
(916) 617-4854
(800) 852-7550
Spills of 50,000 gallons or more require water quality monitoring (sampling). 368
Appendix F
Septage Haulers
Company Name Phone Number
A-1 Septic Service (916) 371-4160
BCM Company (916) 383-4533
G&C Septic Tank Service (916) 366-1111
Yolo Pumping Services, Inc. (530) 662-5534
Curt’s Pumping & Septic (530) 888-1023
Advanced Septic Service (916) 993-3521
Cost U Less Septic Pumping (916) 372-2093
Houser Septic Tank Service (530) 666-0347
369
Leslie Lindbo, MBA, REHS
Director of Environmental Health
State Certified Drinking Water Laboratories
The following chart represents the Napa-Solano-Yolo-Marin County Public Health Laboratory and Yolo-Sacramento Regional Commercial Laboratories certified for Drinking Water Analysis. It was compiled from information obtained from the State Environmental Laboratory Accreditation Program (ELAP). It is not inclusive of all laboratories available and is not an endorsement of any particular laboratory. To access the complete list of ELAP laboratories please go to the Certified Laboratory list maintained on the state website at http://www.waterboards.ca.gov/drinking_water/certlic/labs/index.shtml Laboratory Bacteriological
Quality
Inorganic
Chemicals
Organic
Chemicals
Radionuclides Disinfection
By Products
Alpha Analytical Laboratories, Inc.
9090 Union Park Way, Suite 113
Elk Grove, CA 95624
(916) 686-5190
  
BSK Analytical Laboratories
3140 Gold Camp Drive, Suite 160
Rancho Cordova, CA 95670
(916) 853-9293
    
CLS Labs
3249 Fitzgerald Road
Rancho Cordova, CA 95742
(916) 638-7301
    
Continental Water Laboratory
8631 Younger Creek Drive
Sacramento, CA 95828
(916) 379-2323
    
Dellavalle Laboratory, Inc.
502 Mace Boulevard, Suite 2B
Davis, CA 95618
(800) 228-9896
    
McCampbell Analytical, Inc.
1534 Willow Pass Road
Pittsburg, CA 94565
(925) 252-9262
   
*Napa-Solano-Yolo Co Public
Health Lab
2201 Courage Dr. MS 9-200
Fairfield, CA 94533
(707)784-4410
    
Pace Analytical, LLC
2795 2nd Street, Suite 300
Davis, CA 95616
(530) 297-4800
    
County of Yolo COMMUNITY SERVICES DEPARTMENT

ENVIRONMENTAL SERVICES DIVISION
292 W. Beamer St, Woodland, CA 95695
PHONE (530) 666-8646 FAX (530) 669-1448
Last Updated 02/23/17
370
Sparger Technology, Inc.
3738 Bradview Drive
Sacramento, CA 95827
(916) 369-7688
   
Sunland Analytical Lab, Inc
11353 Pyrites Way, Suite 4
Rancho Cordova, CA 95670
(916) 852-8557

Testamerica West Sacramento
880 Riverside Parkway
West Sacramento, CA 95605
(916) 373-5600
    
* Yolo County Environmental Health Division contracts with the Napa-Solano-Yolo County Public Health Lab. We will accept water samples for bacteriological quality testing Monday-Friday before 3pm. If you are a Public Water System, you may drop off your water sample Monday-Thursday before 3pm. Nitrate/Nitrite testing will only be accepted on Tuesdays before 3pm. This applies to both private and Public Water System testing. Samples brought in after 3pm and out of temperature will not be accepted.

Last Updated 02/23/17
371
Appendix C
SSMP AUDIT JAN. 29, 2025
372

BLACK & VEATCH CORPORATION
2999 Oak Rd, Suite 490 | Walnut Creek, CA 94597
916-642-6124 | [email protected]
January 29, 2025
Amber Wallace, PE
Senior Civil Engineer
City of West Sacramento
1110 West Capitol Avenue, 1st Floor
West Sacramento, CA 95691
Subject: Sewer System Management Plan Audit for the 3-Year Audit Period Ending August 2, 2024 Dear Ms. Wallace:

This letter summarizes the audit that Black & Veatch (BV) conducted of the City of West Sacramento’s (City’s) Sanitary Sewer Management Plan (SSMP) for compliance with the Statewide Waste Discharge Requirements General Order WQ 2022-0103-DWQ (General Order) that superseded the previous General Order 2006-003-DWQ and the subsequent amendments.

This objective of the audit of the current SSMP is intended to meet the requirements of the General Order including Specifications 5.4, documenting:
• An evaluation of the previous audit to ensure deficiencies have been rectified. • Identified compliance gaps/deficiencies in adhering to the requirements of the reissued General Order for all elements and sub-elements, including resilience. • Identified implementation gaps/deficiencies in performing as described in the current SSMP. • Identified effectiveness gaps/deficiencies for all elements (and in some cases the subelements) using key performance indicators in preventing spills and discharges to waters of the State.
• Specific short and long-term corrective actions or enhancements needed to rectify each gap/deficiency and a schedule for each action.

1.0 Introduction
The reissued General Order includes changes and additional requirements for a City to comply with federal and state prohibitions of discharge of sewage to waters of the State; comply with specifications, notification, monitoring, reporting and recordkeeping requirements; proactively operate and maintain resilient sanitary sewer systems to prevent spills, eliminate discharges of sewage to waters of the State through effective implementation of an SSMP; monitor, track, and analyze spills for ongoing systemspecific performance improvements; and report noncompliance with the reissued General Order per reporting requirements.

The City’s SSMP was last updated in June 2018 and the Sanitary Sewer Overflow Response Plan was updated in January 2015.
373
January 24, 2025 | Page 2
City of West Sacramento - Sewer System Management Plan Audit

2.0 Key Regulatory Drivers
While considering that the City’s collection system is relatively small with average complexities, we recommend that the City focus their regulatory compliance efforts on 1) meeting the requirements of the General Order, and 2) avoiding enforcement actions – both of which are highlighted in the following sections.

2.1 SSMP Audit Requirements
The key requirements for SSMP Audits are described in Section 5.4 of the General Order as:

5.4. Sewer System Management Plan Audits
The Enrollee shall conduct an internal audit of its Sewer System Management Plan, and implementation of its Plan, at a minimum frequency of once every three years. The audit must be conducted for the period after the end of the Enrollee’s last required audit period.

Within six months after the end of the required 3-year audit period, the Legally Responsible Official shall submit an audit report into the online CIWQS Sanitary Sewer System Database per the requirements in section 3.10 (Sewer System Management Plan Audit Reporting Requirements) of Attachment E1 of this General Order.

Audit reports submitted to the CIWQS Sanitary Sewer System Database will be viewable only to Water Boards staff.

The internal audit shall be appropriately scaled to the size of the system(s) and the number of spills. The Enrollee’s sewer system operators must be involved in completing the audit. At minimum, the audit must:
• Evaluate the implementation and effectiveness of the Enrollee’s Sewer System Management Plan in preventing spills;
• Evaluate the Enrollee’s compliance with this General Order; • Identify Sewer System Management Plan deficiencies in addressing ongoing spills and discharges to waters of the State; and
• Identify necessary modifications to the Sewer System Management Plan to correct deficiencies.

The Enrollee shall submit a complete audit report that includes:
• Audit findings and recommended corrective actions;
• A statement that sewer system operators’ input on the audit findings has been considered; and
• A proposed schedule for the Enrollee to address the identified deficiencies.

SSMP Audit reporting and recordkeeping requirements are described in General Order Attachment E1, Section 3.10., which states:

3.10. Sewer System Management Plan Audit Reporting Requirements The Enrollee shall submit its Sewer System Management Plan Audit and other pertinent audit information, in accordance with section 5.4 (Sewer System Management Plan Audits) 374
January 24, 2025 | Page 3
City of West Sacramento - Sewer System Management Plan Audit of this General Order, to the online CIWQS Sanitary Sewer System Database by six (6) months after the end of the 3-year audit period.

If a Sewer System Management Plan Audit is not conducted as required: the Enrollee shall:
• Update the online CIWQS Sanitary Sewer System Database and select the justification for not conducting the Audit; and
• Notify its corresponding Regional Water Board (see Attachment F (Regional Water Quality Control Board Contact Information)) of the justification for the lapsed requirements.

The Enrollee’s reporting of a justification for not conducting a timely Audit does not justify non-compliance with this General Order. The Enrollee shall:
• Submit the late Audit as required in this General Order; and • Comply with subsequent Audit requirements and due dates corresponding with the original audit cycle.

The State Water Board transitioned SSMP Update and Audit due dates to align with the changes in the Reissued General Order, and lists them on the State Water Board website here:
https://www.waterboards.ca.gov/water_issues/programs/sso/lookup/. The City’s due dates are shown in Figure 2-1.

Figure 2-1. Sewer System Management Plan Update and Audit Due Dates A General Order compliance checklist is included in Attachment A of this letter, and Table 2-1 summarizes near-term deadlines.

Table 2-1. Near-Term General Order Deadlines

DUE DATE ACTION ITEMS
End of 3-Year Audit Period: AUG 2, 2024 SSMP 3-Year Audit (initiate audit/draft report) Due FEB 2, 2025 SSMP 3-Year Audit (final report/certify/upload by LRO) 375
January 24, 2025 | Page 4
City of West Sacramento - Sewer System Management Plan Audit No hard deadline. Initiate upon completion of
SSMP Audit Report.
2025 SSMP Update (initiate review/draft new SSMP)
Due AUG 2, 2025 2025 SSMP Update (final report/certify/upload by LRO)

2.2 SSMP Requirements
Table 2-2 summarizes the General Order reference location for detailed requirements for each element of the SSMP, along with a summary of key changes in the reissued General Order in 2022.

Table 2-2. General Order Reference Section for Sanitary Sewer Management Plan Elements

COMPONENT

GENERAL ORDER
REFERENCE SECTION KEY GENERAL ORDER CHANGES IN 20221
Element 1: Goal &
Introduction
• Attachment D.1
• Spec. 5.2
• Implementation of SSMP as “living document.”
• Enforcement of development, update, and implementation. • Narratives for regulatory context, assets, updated sewer map(s).

Element 2:

Organization
• Attachment D.2
• Spec. 5.1
• Name of Legally Responsible Official.
• Enhanced details on LRO training and experience requirements.

Element 3: Legal
Authority
• Attachment D.3 • Collaboration with storm drain agencies; easement accessibility agreements.

Element 4:

Operations and
Maintenance
Program
• Attachment D.4
• Spec. 5.7
• Spec. 5.19
• Procedures for maintaining/providing Water Board access to sewer map(s)
• Enhanced training/General Order, drills/skilled vol. est., CIWQS reporting; scheduling system in place.

Element 5: Design
and Performance
Provisions
• Attachment D.5 • Few changes.

Element 6: Spill
Emergency
Response Plan
• Attachment D.6
• Spec. 5.12
• Attachment E-1
• Numerous upgrades to notification, monitoring, reporting, record keeping, definitions.
• Staff/contractor requirements for implementation,
removing/cleaning sewage from drainage conveyance systems not impacting beneficial uses/receiving waters.
• Coordination/collaboration with storm drain agencies (prior, during, after) spills.
• Post-spill assessments, annual assessment, implement
containment tech/practices.
• Requires annual certification in Annual Report that SERP is updo-date.

Element 7: Sewer
Pipe Blockage
Control Program
• Attachment D.7 • Plan/schedule for pipe-blocking substances. • Commercial controls/authority to inspect, “hot spot” program, source controls.
1 Source: BACWA Guide for Developing and Updating of SSMPs, July 2024 376
January 24, 2025 | Page 5
City of West Sacramento - Sewer System Management Plan Audit

COMPONENT

GENERAL ORDER
REFERENCE SECTION KEY GENERAL ORDER CHANGES IN 20221
Element 8: System
Evaluation,
Capacity
Assurance, Capital
Improvements
• Attachment D.8
• Spec. 5.6
• Spec.5.10
• Implementation of capital improvements.
• Identify/justify and prioritize specific system areas (high env. consequences/areas, new surface waters, steep terrain, high groundwater, near surface waters), exfiltration, recordkeeping enhancements, assets vulnerable to climate impacts.
• More information for capacity assessments, inspections, audits. • Capacity of flood-prone systems subject to inflow/infiltration. • Increases in erosive forces, pumping redundancy, prioritization of corrective actions.
• Enhanced coordination (operations/maintenance/engineering, other utilities).

Element 9:

Monitoring,
Measurement,
Program
Modifications
• Attachment D.9
• Spec. 5.11
• Adaptive management/implementation effectiveness (Key Performance Indicators).
• Update procedures/activities based on
monitoring/performance evaluations.

Element 10:

Internal Audits
• Attachment D.10 • Completed every 3 years (vs. every 2 years), input from operators, and cert/upload/LRO.

Element 11:

Communication
Program
• Attachment D.11 • Enhanced communications procedures
(public/owners/operators connected to sewers).

Designation of LRO • Spec. 5.1 • LRO must have authority to ensure compliance, authority over management of the entire sewer system, and authorized to make managerial decisions governing operations, capital improvements, and ensuring long-term environmental
compliance.
• LRO must possess recognized degree/certificate for O/M of sewer systems and/or professional training and experience demonstrated through extensive knowledge, training, and experience.

SSMP
Development and
Implementation
• Spec. 5.2 • Agencies must develop and implement an SSMP (ensuring adequate funding/management, matching size, scale and
complexity, procedures for management, operation,
maintenance, prioritization of system repairs and maintenance, implementation of current standard industry practices through available equipment, technologies, and strategies).

Certification of
SSMP and
Updates
• Spec. 5.3 • Legally Responsible Official must certify/upload SSMPs to CIWQS.

SSMP Audits • Spec. 5.4 • Audits of SSMPs every 3 years (vs. every 2 years under 2006 General Order).
• Within 6 months after the end of the required 3- year Audit period, the agency Legally Responsible Official shall submit the Audit report into the online CIWQS database per requirements of section 3.10 of Attachment E1 of the Reissued General Order). Audit reports will only be viewable publicly in CIWQS by Water Board staff.
• Audits must 1) be sized/scaled to system, 2) evaluate implementation and effectiveness of SSMP in preventing spills, 3) identify necessary modifications to SSMP for correcting 377
January 24, 2025 | Page 6
City of West Sacramento - Sewer System Management Plan Audit

COMPONENT

GENERAL ORDER
REFERENCE SECTION KEY GENERAL ORDER CHANGES IN 20221
deficiencies, and 4) include a proposed schedule for correcting deficiencies.

Six-Year SSMP
Update
• Spec. 5.5 • Agencies must update their SSMPs and include a summary of revisions based on Audit findings every 6 years (vs. every 5 years under 2006 General Order).

System Resilience • Spec 5.6 • Agencies must include and implement system-specific procedures to proactively prioritize O/M, condition
assessments, and repair/rehabilitation.

Notif, Monit,
Report., Records
• Spec 5.13,
Attachment E-1
• Numerous changes throughout; adds one new spill category (Category 4); new reporting requirements for systems with Cityowned laterals.

Annual Report • Spec. 5.11
• Spec. 5.12
• Spec. 5.13.2
• Attachment E1-3.9
• Streamlined (fewer) reporting fields; requires uploading of spill performance charts; includes options for adding comments and/or attaching doc(s) to elaborate on answers.

Service Area
Boundary Map
• Spec. 5.14 • New requirements for uploading an electronic boundary map (required between July1 to Dec 31, 2025, for all continuing Citys).

Pre-Insp.

Questionnaire
• Provisions 6.4.2 • Requires agencies to provide pre-inspection information to State and Regional Water Board staff through the completion of a Questionnaire.

2.3 Enforcement Considerations
The City’s Legally Responsible Officials (LROs), managers, and Board of Directors should review and be aware of potential liabilities for noncompliance with the General Order. An excellent practice is to review enforcement language outlined in Specifications 5.17 and 5.18 (page 27) and Provisions 6 (pages 27-31) of the General Order. In addition, the City should also:

1. Keep abreast of the latest Water Board enforcement penalty actions in Region 5 (see CIWQS Administrative Civil Liability ACL Report) and review example enforcements to improve City understanding about the enforcement process and potential ramifications for noncompliance.

Here is one example of a Region 5: Central Valley Regional Water Board Enforcement.

2. Review the most current version of the Water Board Enforcement Policy to understand the specific factors considered by State/Regional Water Boards in assessing civil liabilities with formal enforcement Orders. The most recent Policy was changed in 2017 (potentially affecting the example above). As of June 2024, the State Water Board has proposed additional changes to the Policy. Visit the State Water Board’s Office of Enforcement Water Quality Enforcement Policy Amendments for the latest Policy.

3. Review the list of common violations summarized in Attachment B of this letter. 378
January 24, 2025 | Page 7
City of West Sacramento - Sewer System Management Plan Audit

3.0 SSMP Audit Methodology
The process used to audit the City’s 2018 SSMP is described below and aligns with the recommendations of the Bay Area Clean Water Agencies Guide for Developing and Updating Sewer System Management Plans.

1. Collect available background information and system performance data from the City.

2. Conduct a desktop review of information provided by the City and publicly available benchmark data.

3. Conduct staff interviews at all levels of the organization - including operations and maintenance staff.

4. Evaluate the existing SSMP for compliance, implementation and effectiveness while addressing system resilience.

5. Develop a draft SSMP Audit Report summarizing findings and a corrective action plan.

6. Review the draft SSMP Audit Report with City staff (including operations and maintenance staff) and document an agreed upon schedule.

7. Finalize the SSMP Audit Report and submit it to the City for certification/upload.

The General Order requires that the audit evaluate the existing SSMP for compliance, implementation and effectiveness while addressing system resilience. These terms are defined as:
• Compliance is the act of meeting regulations. Compliance is the most fundamental aspect of the SSMP as all the requirements in the individual elements must be incorporated and addressed.

Attachment D of the General Order specifies “The City’s development, update, and implementation of an SSMP addressing the requirements of this Attachment is an enforceable component of this General Order.”
• Implementation is the actions or steps taken to accomplish tasks, goals, and objectives. There needs to be a plan and schedule to carry out these actions. To implement a plan, a goal, level of effort, resources, and timeline need to be determined.
• Effectiveness is the degree to which something is successful in producing a desired result. There must be a procedure or method to measure effectiveness so the degree to which something is effective can be determined. A requirement of an internal audit (Element 10 of the SSMP) is to measure the effectiveness of each SSMP element.
• Resilience is the ability to recover from or adjust to adversity or change and grow from disruptions and includes recovering from system failures. Resilience can be built through planning and preparation for, mitigation of, and adaptation to changing conditions.

Key Performance Indicators (KPIs) are used to evaluate the effectiveness of the program. A KPI is a measurable target that indicates how plans and processes are working in terms of obtaining desired results. KPIs provide focus for strategic and operational improvements, create an analytical basis for decision making, and help place attention on what matters most. 379
January 24, 2025 | Page 8
City of West Sacramento - Sewer System Management Plan Audit

4.0 SSMP Audit
This section describes the SSMP audit findings and recommended corrective actions (with schedule) for the three-year audit period ending August 2, 2024.

4.1 Desktop Assessment
BV reviewed available information provided by the City including organization charts, CIWQS records, workorder data, geodatabases, maintenance and inspection record database, Master Plan, City ordinances, the existing 2018 SSMP, the 2015 Sanitary Sewer Overflow Response Plan, and spill records.

BV also conducted staff interviews with all levels of the organization to gather updated information about the City’s current wastewater collection system program.

The information provided by the City was compiled and evaluated using a desktop assessment. This information is presented in Attachments C through G of this letter and includes:
• System Information – Attachment C
• SSO and Maintenance Records – Attachment D
• Spill Data Summary – Attachment E
• Key Performance Indicators – Attachment F
• Annual SSMP Update Schedule – Attachment G

4.2 SSMP Evaluation
Table 4-1 summarizes the responsible City staff members for each SSMP Element.

Table 4-1. Responsible City Staff for Sanitary Sewer Management Plan Elements

ELEMENT ELEMENT NAME RESPONSIBLE CITY OFFICIAL RESPONSIBLE PERSON 1 Goal and Introduction Public Works Director (Acting) Ariana Adame 2 Organization Utilities Maintenance
Superintendent Robert Santos
3 Legal Authority Public Works Director (Acting) Ariana Adame 4 Operation and Maintenance
Program
Utilities Maintenance
Superintendent Robert Santos
5 Design and Performance
Provisions City Engineer Mark Collier
6 Spill Emergency Response Plan Utilities Maintenance
Superintendent Robert Santos
7 Sewer Pipe Blockage Control
Program
Utilities Maintenance
Superintendent Robert Santos
8 System Evaluation, Capacity
Assurance, Capital
Improvements
Senior Civil Engineer Amber Wallace
9 Monitoring, Measurement,
Program Modifications
Utilities Maintenance
Superintendent Robert Santos
10 Internal Audits Utilities Maintenance
Superintendent Robert Santos
11 Communication Program Utilities Maintenance
Superintendent Robert Santos
380
January 24, 2025 | Page 9
City of West Sacramento - Sewer System Management Plan Audit Table 4-2 summarizes the findings and corrective actions from evaluation of the compliance, implementation, and effectiveness of the existing SSMP. 381
January 24, 2025 | Page 10
City of West Sacramento - Sewer System Management Plan Audit Table 4-2. Audit Findings and Corrective Action Plan

REQUIREMENT CORRECTIVE ACTION PLAN

FACTOR ACTION NAME
ELEMENT 1 – GOAL AND INTRODUCTION
The goal of the SSMP is to provide a plan and schedule to: “Properly manage, operate, and maintain all parts of the City’s sanitary sewer system, reduce, and prevent spills, contain, and mitigate spills that do occur.

1.1 REGULATORY CONTEXT
A.

The SSMP Introduction section must provide a
general description of the local sewer system
management program and discuss SSMP
implementation and updates.

Compliance
• Add this newly required subsection to the SSMP.
• Provide a general description of the SSMP and how you will implement and update it.

Robert Santos
Implementation
• Update the table of staff positions and roles/responsibilities for SSMP review, development, implementation, and updates for each Element.
• Include the process in place for ensuring the SSMP will be fully implemented as written – including periodic review dates of the entire SSMP for ensuring continuous compliance, implementation, and striving to improve effectiveness of all elements.

Robert Santos
Effectiveness
Review KPIs in Attachment F for each element; adjust element content and update the SSMP Change Log as necessary prior to completion of next audit.

Ariana Adame

1.2 SSMP UPDATE SCHEDULE
B.

The SSMP Introduction section must include a
schedule for the City to update the SSMP, including
the schedule for conducting internal audits. The
schedule must include milestones for incorporation
of activities addressing sewer spill prevention.

Compliance
• Add this newly required subsection to the SSMP.
• Include a compliance plan & schedule (see Attachments A and G as a start):
• Required due dates for updating the SSMP.
• Required due dates to conduct SSMP Audits, including audit period covered, start and finish dates.
• Annual review of previous SSMP audit findings.
• Update Element 1 whenever 1) significant work/program or organizational changes are made, 2) anytime the SSMP
Implementation Team has a change of members/responsibilities, 3) when SSMP audits are completed.
• Make a list of significant milestones of spill prevention activities (cleaning, inspection, repair, etc.) that will be conducted during the six-year SSMP update cycle.

Ariana Adame
Implementation Regularly review this element to ensure adherence to the schedule and timely achievement of milestones. Ariana Adame
382
January 24, 2025 | Page 11
City of West Sacramento - Sewer System Management Plan Audit

REQUIREMENT CORRECTIVE ACTION PLAN

FACTOR ACTION NAME
Effectiveness Track KPIs 1 and 2 as described in Attachment F for measuring whether deadlines are met. Ariana Adame

1.3 SEWER SYSTEM ASSET OVERVIEW
C.

The City SSMP must have an Introduction section to
provide a description of the City-owned assets and
service area including but not limited to:
• Location, including county(ies).
• Service area boundary.
• Population and community served.
• System size, including total length in miles, length
of gravity mainlines, length of pressurized (force)
mains, and number of pump stations and siphons.
• Structures diverting stormwater to the sewer
system.
• Data management systems.
• Sewer system ownership and operation
responsibilities between the City and private
entities for upper and lower sewer laterals.
• Estimated number or percent of residential,
commercial, and industrial service connections.
• Unique service boundary conditions and
challenge(s).

Reference to the City’s up to-date map of its sanitary
sewer system.

Compliance
Add this newly required subsection to the SSMP including:
• Current service area, population, and sewer assets in the map. • Include unique features or challenging characteristics (e.g., inaccessible areas, surface water crossings)
• Ownership and operation responsibilities between the City and private entities.
• Percent of residential, commercial, and industrial connections. • Statement confirming system maps (also required by Element 4) are up to date.

Robert Santos
Implementation
Combine with Element 4 map requirements. Establish a schedule for GIS data review and update and assign review/update tasks to a responsible person.

Robert Santos
Effectiveness Combine with Element 4 map requirements. Track KPI 2 in Attachment F to keep the GIS map up to-date. Robert Santos
ELEMENT 2 – ORGANIZATION
A.

The SSMP must identify organizational Staffing
responsible and integral for implementing the local
SSMP through an organizational chart or other similar
narrative documentation that includes:
• The name of the Legally Responsible Official as
required in section 5.1 (Designation of a Legally
Responsible Official) of the General Order.

Compliance
• Update names and contact info for LROs and Data Submitters in Appendix A in the SSMP.
• Update contact information for management, administrative, and maintenance positions.
• Update the organization chart in Figure 2-1.
• Update description of the chain of communication for spills from receipt of a call reporting a spill, to the spill report certification.

Robert Santos
383
January 24, 2025 | Page 12
City of West Sacramento - Sewer System Management Plan Audit

REQUIREMENT CORRECTIVE ACTION PLAN

FACTOR ACTION NAME
• The position titles, telephone numbers, and email
addresses for management, administrative, and
maintenance positionsresponsible for
implementing specific SSMP elements.
• Organizational lines of authority.
• Chain of communication for reporting spills from
receipt of complaint or other information, including
the person responsible for reporting spills to the
State and Regional Water Boards and other
agencies, as applicable.

Implementation
Annually review to ensure:
• LRO information is current.
• Contact information for management, administrative, and maintenance positions are current.
• Chain of communication for spills is correct.

Robert Santos
Effectiveness Track KPI 2 in Attachment F to ensure the organization chart and contact information are up to date.

Robert Santos
ELEMENT 3 – LEGAL AUTHORITY
The City SSMP must include copies or an electronic link to the City’s current sewer system use ordinances, service agreements and/or other legally binding procedures to demonstrate the City possesses the necessary legal authority to:

A.

Prevent illicit discharges into its sanitary sewer
system from inflow and infiltration (I&I);
unauthorized stormwater; chemical dumping;
unauthorized debris; roots; fats, oils, and grease; and trash, including rags and other debris that may cause
blockages.

Compliance (No action. In compliance.)
Implementation Establish and implement a procedure for updating ordinances, codes, and agreements when deficiencies are discovered by staff. Robert Santos Effectiveness Track KPI 3 in Attachment F to keep the City’s Code up to date and adequate.

Ariana Adame
B.

Collaborate with storm sewer agencies to coordinate
emergency spill responses, ensure access to storm
sewer systems during spill events, and prevent
unintentional cross connections of sanitary sewer
infrastructure to storm sewer infrastructure.

Compliance Add this new requirement to the SSMP. Ariana Adame Implementation (No action. City owns the storm sewer system.) Effectiveness (No action. City owns the storm sewer system.) C.

Require that sewer system components and
connections be properly designed and constructed.

Compliance (No action. In compliance.)
Implementation (No action.)
Effectiveness Track KPI 3 in Attachment F to keep the City’s Code up to date and adequate. Ariana Adame
D.

Ensure access for maintenance, inspection, and/or
repairs for portions of the service lateral owned
and/or operated by the City.

Compliance (No action. In compliance.)
Implementation (No action.)
Effectiveness Track KPI 3 in Attachment F to keep the City’s Code up to date and adequate. Ariana Adame
E. Compliance (No action.)
384
January 24, 2025 | Page 13
City of West Sacramento - Sewer System Management Plan Audit

REQUIREMENT CORRECTIVE ACTION PLAN

FACTOR ACTION NAME
Enforce violation(s) of ordinances, service
agreements, or other legally binding procedures.

Implementation (No action. The ordinance/codes/service agreements are available on the City website.)
Ariana Adame
Effectiveness Track KPI 3 in Attachment F to keep the City’s Code up to date and adequate. Ariana Adame
F.

Obtain easement/accessibility agreements for
locations requiring sewer system operations and
maintenance, as applicable.

Compliance (No action.)
Implementation (No action.)
Effectiveness (No action.)
ELEMENT 4 – OPERATIONS AND MAINTENANCE PROGRAM

4.1 UPDATED MAP OF SANITARY SEWER SYSTEM
A.

The SSMP must include the items listed below that
are appropriate and applicable to the City’s system:

An up-to-date map(s) of the sanitary sewer system,
and procedures for maintaining and providing State
and Regional Water Board staff access to the map(s).

The map(s) must show gravity line segments and
manholes, pumping facilities, pressure pipes and
valves, and applicable stormwater conveyance
facilities within the sewer system service area
boundaries.

Compliance Include a PDF map in the SSMP. Robert Santos Implementation Establishing procedure(s) for keeping maps/webmaps current. Robert Santos Effectiveness Track KPI 2 in Attachment F to keep the GIS map up to-date. Robert Santos

4.2 PREVENTIVE OPERATION AND MAINTENACE ACTIVITIES
A scheduling system and a data collection system for preventive operation and maintenance activities conducted by staff and contractors must include:

B. A scheduling system for inspection and maintenance
activities.

Compliance
• Update Section 4.2 to reflect current activities.
• Develop a plan and schedule for inspection and preventative maintenance for the entire system.

Robert Santos
Implementation Implement the plan and schedule for inspection and preventative maintenance for the entire system.

Robert Santos
Effectiveness Track KPIs 5 and 6 in Attachment F to follow the plan and schedule for system inspection and preventative maintenance. Robert Santos C. A scheduling system for higher-frequency
inspections.

Compliance Describe the plan and schedule for inspecting trouble spots more frequently – including troublesome lift stations. Robert Santos Implementation Implement the plan and schedule for inspecting trouble spots more frequently – including troublesome lift stations. Robert Santos Effectiveness Track KPIs 5 and 6 in Attachment F to follow the plan and schedule for pump/lift station visual inspection and CCTV inspections.

Robert Santos
385
January 24, 2025 | Page 14
City of West Sacramento - Sewer System Management Plan Audit

REQUIREMENT CORRECTIVE ACTION PLAN

FACTOR ACTION NAME
D.

A scheduling system for maintenance of known
problem areas including areas with tree root
problems.

Compliance Describe the plan and schedule of preventative maintenance for hot spot pipelines and pump stations.

Robert Santos
Implementation Implement the plan and schedule of preventative maintenance for hot spot pipelines and pump stations.

Robert Santos
Effectiveness Track KPI 5 in Attachment F to follow the plan and schedule for hot spot cleaning.

Robert Santos
E.

A scheduling system for regular visual and closedcircuit television (CCTV) inspections of manholes and sewer pipes.

Compliance Include the Inspection Plan from the 2024 Sewer Master Plan. Robert Santos Implementation (No action. City is continuing to implement the Inspection Plan) Effectiveness Track KPI 6 in Attachment F to follow the plan and schedule for system CCTV inspection.

Robert Santos
F.

A data collection system to document the data from
system inspection and maintenance activities,
including system areas/components prone to rootintrusion potentially resulting in system backup and/or failure.

Compliance
Describe the computerized maintenance management system (CMMS) and how it tracks inspection & maintenance activities and results (e.g., documenting service calls, creating work orders).

Robert Santos
Implementation Add the maintenance and inspection cycle to CMMS for all key assets, periodically evaluate them, and adjust as needed.

Robert Santos
Effectiveness (No action.)

4.3 TRAINING
G.

In-house and external training provided on a regular
basis for sanitary sewer system operations and
maintenance staff and contractors. The training must
cover:
• The requirements of the General Order
• The City’s SERP procedures and practice drills
• Skilled estimation of spill volume for field
operators, and
• Electronic CIWQS reporting procedures for staff
submitting data.

Compliance
Update the training program to meet requirements and reflect what is being done. Describe a training program for spill response personnel, data submitters, and LROs that meets all the requirements and list the regular training frequency (the appropriate level of training is at the City’s discretion).

Robert Santos
Implementation Implement the newly developed training program and keep consistent records of training and attendance.

Robert Santos
Effectiveness Quiz staff ability and knowledge after each training event/weekly tailgate.

Robert Santos

4.4 EQUIPMENT INVENTORY
H.

An inventory of sewer system equipment, including
the identification of critical replacement and spare
parts.

Compliance The inventory is currently kept on CMMS. This should be described in the SSMP and reviewed periodically.

Robert Santos
Implementation
Periodically audit the inventory to make sure it is up to date. Ensure that the location of the inventory items is well-known by the staff and are readily accessible.

Robert Santos
386
January 24, 2025 | Page 15
City of West Sacramento - Sewer System Management Plan Audit

REQUIREMENT CORRECTIVE ACTION PLAN

FACTOR ACTION NAME
Effectiveness Track KPI 2 in Attachment F to ensure the equipment inventory is up to date.

Robert Santos
ELEMENT 5 – DESIGN AND PERFORMANCE PROVISIONS

5.1 UPDATED DESIGN CRITERIA AND CONSTRUCTION STANDARDS AND SPECIFICATIONS The SSMP must include the following items as appropriate and applicable to the City’s system:

A.

Updated design criteria, and construction standards
and specifications for the construction, installation,
repair, and rehabilitation of existing and proposed
system infrastructure components, including but not
limited to pipelines, pump stations, and other system
appurtenances.

Compliance Update Section 5.1 to reflect the most recent updates to the design criteria and standards. Mark Collier
Implementation (No action. Currently updating the design criteria and standards.) Effectiveness Track KPI 4 in Attachment F to ensure the design criteria and construction standards and specifications are up to date. Mark Collier B.

If existing design criteria and construction standards
are deficient to address the necessary componentspecific hydraulic capacity as specified in Element 8 (System Evaluation, Capacity Assurance and Capital
Improvements), the procedures must include
component-specific evaluation of the design criteria.

Compliance Update design criteria to address hydraulic capacity for both pipes and pump stations and record the updates in the SSMP. Mark Collier Implementation
If portions of the collection system are experiencing surcharging during rain events, they would be evaluated and compared to what is expected.

Mark Collier
Effectiveness (No action.)

5.2 PROCEDURES AND STANDARDS
C.

Procedures and standards for the inspection and
testing of newly constructed, newly installed,
repaired, and rehabilitated system pipelines, pumps,
and other equipment and appurtenances.

Compliance (No action. In compliance.)
Implementation Review inspection records to ensure adherence to standards and specifications. Mark Collier
Effectiveness Track KPI 4 in Attachment F to ensure the procedures and standards for the inspection and testing are up to date. Mark Collier ELEMENT 6 – SPILL EMERGENCY RESPONSE PLAN
The SSMP must include an up-to-date SERP to ensure prompt detection and response to spills to reduce spill volumes and collect information for prevention of future spills.

The SERP must include procedures to meet all the following:

A.

Notify primary responders, appropriate local officials, and appropriate regulatory agencies of a spill in a
timely manner.

Compliance Review Section 6.4 to ensure it is up to date. Robert Santos Implementation
Establish realistic response time goals and monitor emergency response performance. Include a call-list for all appropriate contacts and ensure it is readily available to response staff.

Robert Santos
Effectiveness Track KPI 2 in Attachment F to ensure spills are responded in a timely manner.

Robert Santos
B. Compliance Review Section 6.6.4 to ensure it is up to date. Robert Santos 387
January 24, 2025 | Page 16
City of West Sacramento - Sewer System Management Plan Audit

REQUIREMENT CORRECTIVE ACTION PLAN

FACTOR ACTION NAME
Notify other potentially affected entities (for example, health agencies, watersuppliers, etc.) of spills that
potentially affect public health or reach waters of the State.

Implementation Include a call-list for all appropriate contacts and ensure it is readily available to response staff. Robert Santos
Effectiveness Track KPI 2 in Attachment F to ensure the contact information for other agencies are up to date. Robert Santos
C.

Comply with the notification, monitoring and
reporting requirements of the General Order, State
law and regulations, and applicable Regional Water
Board Orders.

Compliance (No action. In compliance.)
Implementation Ensure appropriate staff are familiar with reporting timelines and trained in data submitting, as required by the Reissued General Order. Robert Santos Effectiveness (No action.)
D. Ensure that appropriate staff and contractors
implement the SERP and are appropriately trained.

Compliance (No action. In compliance.)
Implementation Follow the training schedule and keep training records. Robert Santos Effectiveness (No action. Combine with element 4.3)
E. Address emergency system operations, traffic
control, and other necessary response activities.

Compliance Update SERP to include this information (e.g., traffic and crowd control). Robert Santos
Implementation Include how to coordinate with law enforcement and/or fire departments for assistance in large volume traffic areas. Robert Santos Effectiveness (No action. Evaluate once information is updated.) F.

Contain a spill and prevent/minimize discharge to
waters of the State or any drainage conveyance
system.

Compliance (No action. In compliance.)
Implementation (No action. Current approach is effective.) Effectiveness Track KPI 8 in Attachment F to ensure all spills are effectively contained. Robert Santos
G.

Minimize and remediate public health impacts and
adverse impacts on beneficial uses of waters of the
state.

Compliance (No action. In compliance.)
Implementation (No action. Current approach is effective.) Effectiveness (No action. Minimization and remediation efforts appear effective.) H. Remove sewage from the drainage conveyance
system.

Compliance (No action. In compliance.)
Implementation (No action.)
Effectiveness Track KPI 8 in Attachment F to ensure all spills are effectively contained. Robert Santos
388
January 24, 2025 | Page 17
City of West Sacramento - Sewer System Management Plan Audit

REQUIREMENT CORRECTIVE ACTION PLAN

FACTOR ACTION NAME
I.

Clean the spill area and drainage conveyance system
in a manner that does not inadvertently impact
beneficial uses in the receiving waters.

Compliance (No action. In compliance.)
Implementation (No action.)
Effectiveness (No action.)
J.

Implement technologies, practices, equipment, and
interagency coordination to expediate spill
containment and recovery.

Compliance (No action. In compliance.)
Implementation (No action.)
Effectiveness Track KPI 8 in Attachment F to ensure all spills are effectively contained. Robert Santos
K.

Implement pre-planned coordination and
collaboration with storm drain agencies and other
utility agencies/departments prior, during, and after
a spill event.

Compliance (No action. In compliance. The City owns the drainage conveyance system.)
Implementation (No action.)
Effectiveness (No action.)
L. Conduct post-spill assessments of spill response
activities.

Compliance (No action. In compliance.)
Implementation (No action. Current approach is effective.) Effectiveness (No action.)
M. Document and report spill events as required in the
General Order.

Compliance (No action. In compliance.)
Implementation (No action. Current approach is effective.) Effectiveness (No action.)
N. Annually, review and assess effectiveness of the SERP and update it as needed.

Compliance Include a schedule to annually review and assess effectiveness of the SERP and update as needed. Robert Santos
Implementation Follow the schedule to review and update SERP. Robert Santos Effectiveness Track KPI 2 in Attachment F to ensure SERP is reviewed and updated on time.

Robert Santos
ELEMENT 7 – SEWER PIPE BLOCKAGE CONTROL PROGRAM
The SSMP must include procedures for the evaluation of the City’s service area to determine whether a sewer pipe blockage control program is needed to control fats, oils, grease, rags, and debris. If the City determines that a program is not needed, the City shall provide justification in its SSMP for why a program is not needed. The procedures must include, at minimum:
389
January 24, 2025 | Page 18
City of West Sacramento - Sewer System Management Plan Audit

REQUIREMENT CORRECTIVE ACTION PLAN

FACTOR ACTION NAME
A.

An implementation plan and schedule for a public
education and outreach program that promotes
proper disposal of pipe-blocking substances.

Compliance Update Chapter 7.3 to reflect what is being done (e.g., distribute fog kits to homeowners). Robert Santos
Implementation (No action.)
Effectiveness Track KPI 9 in Attachment F to ensure sewer pipe blockage is effectively controlled and minimized. Robert Santos
B.

A plan and schedule for the disposal of pipe-blocking
substances generated within the sanitary sewer
system service area. This may include a list of
acceptable disposal facilities and/or additional
facilities needed to adequately dispose of substances
generated within a sanitary sewer system service
area.

Compliance (No action. In compliance.)
Implementation (No action.)
Effectiveness (No action.)
C.

The legal authority prohibits discharges to the system
and identifies measures to prevent spills and
blockages.

Compliance (No action. In compliance.)
Implementation (No action.)
Effectiveness (No action.)
D.

Requirements to install grease removal devices (such
as traps or interceptors), design standards for the
removal devices, maintenance requirements, best
management practices requirements, recordkeeping
and reporting requirements.

Compliance
Update SSMP to include specifications on grease removal devices, standard drawings, maintenance requirements, BMP requirements, and recordkeeping and reporting requirements.

Robert Santos
Implementation (No action.)
Effectiveness (No action.)
E.

Authority to inspect grease producing facilities,
enforcement authorities, and whether the City has
sufficient staff to inspect and enforce the fats, oils, and grease ordinance.

Compliance Update this section with whether the City has sufficient staff to inspect and enforce the fats, oils, and grease ordinance.

Robert Santos
Implementation
If the City does not have sufficient staff to inspect and enforce the fats, oils, and grease ordinance, develop a plan to improve its staff availability.

Robert Santos
Effectiveness (No action.)
F.

An identification of sanitary sewer system sections
subject to fats, oils, and grease blockages and
establishment of a cleaning schedule for each
section.

Compliance (No action. In compliance.)
Implementation Include a maintenance schedule for the sanitary sewer system sections subject to facts, oils, and grease blockages. Robert Santos Effectiveness Track KPI 10 in Attachment F to ensure sewer pipe blockage is effectively controlled and minimized. Robert Santos
390
January 24, 2025 | Page 19
City of West Sacramento - Sewer System Management Plan Audit

REQUIREMENT CORRECTIVE ACTION PLAN

FACTOR ACTION NAME
G.

Implementation of source control measures for all
sources of fats, oils, and grease reaching the sanitary sewer system for each section identified above.

Compliance Describe how the source control measures are implemented at different sources of fats, oils, and grease. Robert Santos Implementation Ensure all sources of fats, oils and grease are handled correctively. Robert Santos Effectiveness Track KPI 9 in Attachment F to ensure sewer pipe blockage is effectively controlled and minimized. Robert Santos
ELEMENT 8 – SYSTEM EVALUATION, CAPACITY ASSURANCE, AND CAPITAL IMPROVEMENTS The SSMP must include procedures and activities for: Routine evaluation and assessment of system conditions, Capacity assessment and design criteria, Prioritization of corrective actions, and capital improvement plan.

8.1 SYSTEM EVALUATION AND CONDITION ASSESSMENT
The SSMP must include procedures to:

A. Evaluate the sanitary sewer system assets utilizing
the best practices and technologies available.

Compliance
Add this element to the SSMP. Develop a plan to perform and document systematic inspections on all gravity pipes, manholes and lift/pump stations (including sub-assets of lift/pump stations), including force mains/ siphons, etc. Include historic inspection records when performing the evaluation.

Amber Wallace
Implementation Follow the inspection plan. Determine an inspection frequency for each asset.

Tony Barajas and
James Gray
Effectiveness Track KPIs 5 and 6 in Attachment F to ensure the inspection plan is implemented. Robert Santos
B. Identify and justify the amount (percentage) of its
system for its condition to be assessed each year.

Compliance
Add this element to the SSMP. Evaluate past performance, maintenance and repair efforts, and the risk levels from the Master Plan to determine an inspection frequency for each part of the system and describe in this Element of the SSMP.

Amber Wallace
Implementation Develop an inspection plan and schedule.

Tony Barajas and
James Gray
Effectiveness (No action.)
C. Prioritize the condition assessment of system areas
that: Compliance Add this element to the SSMP. Prioritize condition assessment based on the risk levels determined in the Master Plan. Amber Wallace 391
January 24, 2025 | Page 20
City of West Sacramento - Sewer System Management Plan Audit

REQUIREMENT CORRECTIVE ACTION PLAN

FACTOR ACTION NAME
• Hold a high level of environmental consequences if
vulnerable to collapse, failure, blockage, capacity
issues, or other system deficiencies.
• Are located in or within the vicinity ofsurface
waters, steep terrain, high groundwater elevations,
and environmentally sensitive areas.
• Are within the vicinity of a receiving water with a
bacterial-related impairment on the most current
Clean Water Act section 303(d) List (check with
your local Regional Water Quality Control Board for
their latest lists).

Implementation Inspect high risk assets according to the frequency determined above.

Tony Barajas and
James Gray
Effectiveness Track KPIs 5 and 6 in Attachment F to ensure the inspection plan is implemented. Robert Santos
D.

Assess the system conditions using visual
observations, video surveillance and/or other
comparable system inspection methods.

Compliance
Add this element to the SSMP. Determine an inspection frequency for each asset including lift/pump stations, air release valves, and force mains - including alignment inspections/route walks.

Amber Wallace
Implementation Follow the inspection plan developed above.

Tony Barajas and
James Gray
Effectiveness Track KPIs 5 and 6 in Attachment F to ensure the inspection plan is implemented. Robert Santos
E.

Utilize observations/evidence of system conditions
that may contribute to exiting of sewage from the
system which can reasonably be expected to
discharge into a water of the State.

Compliance Update SSMP to include this new requirement. Amber Wallace Implementation
Identify the portions of the collection system with evidence of infiltration. If ground water is infiltrating the pipe, when the water table recedes, it is possible for sewage to exfiltrate (see section 3.24 of Reissued General Order for more information on exfiltration).

Amber Wallace
Effectiveness (No action.)
F.

Maintain documents and recordkeeping of system
evaluation and condition assessment inspections and
activities.

Compliance Maintain records of condition assessment and inspections. No records were provided by the City for this audit. Amber Wallace Implementation Annually review inspection data to track any major or minor changes in the system. All changes should be tracked in a change log.

Tony Barajas and
James Gray
Effectiveness Track KPIs 5 and 6 in Attachment F to ensure the system are regularly evaluated and the results are reviewed in a timely manner. Robert Santos 392
January 24, 2025 | Page 21
City of West Sacramento - Sewer System Management Plan Audit

REQUIREMENT CORRECTIVE ACTION PLAN

FACTOR ACTION NAME
G.

Identify system assets vulnerable to direct and
indirect impacts of climate change, including but not
limited to sea level rise; flooding and/or erosion due
to increased storm volumes, frequency, and/or
intensity; wildfires; and increased power disruptions.

Compliance Update SSMP to include this new requirement. Amber Wallace Implementation
Maintain a list of vulnerable assets and their hazards. Coordinate any major risk mitigation needs with your Local Hazard Mitigation Plan, since its projects may be eligible for FEMA funding.

Amber Wallace
Effectiveness (No action.)

8.2 CAPACITY ASSESSMENT AND DESIGN CRITERIA
H.

The SSMP must include procedures to identify system
components that are experiencing or contributing to
spills caused by hydraulic deficiency and/or limited
capacity, including procedures to identify the
appropriate hydraulic capacity of key system
elements for:
• Dry-weather peak flow conditions that cause or
contribute to spill events.
• The appropriate design storm(s) or wet weather
events that causes or contributes to spill events.
• The capacity of key system components.
• Identify the major sources that contribute to the
peak flows associated with sewer spills.

Compliance Update Chapter 8.1 in the SSMP based on the latest Master Plan.

Include the Master Plan as an Appendix to the SSMP.

Amber Wallace
Implementation Develop and implement a system evaluation procedure. Amber Wallace Effectiveness Track KPI 11 in Attachment F to understand if current procedures are adequate to reduce capacity-related spills. Robert Santos I.

The capacity assessment must consider condition
assessments, inspections, audits, spill history,
capacity of flood-prone systems under storm
conditions, increased inflow and infiltration due to
larger/higher intensity storms due to climate change,
updated design storm, and necessary redundancy in
pumping and storage.

Compliance Include the Master Plan as an Appendix to the SSMP. Amber Wallace Implementation Develop and implement a system evaluation procedure. Amber Wallace Effectiveness Track KPI 11 in Attachment F to understand if current procedures are adequate to reduce capacity-related spills. Robert Santos

8.3 PRIORITIZATION OF CORRECTIVE ACTIONS
J.

The findings of the condition assessments and
capacity assessments must be used to prioritize
corrective actions. Prioritization must consider the
severity of the consequences of potential spills.

Compliance
Update Chapter 8.2 based on the latest Master Plan. Include the Collection System Master Plan as an Appendix. Incorporate any available condition assessment information for gravity sewers and force mains.

Amber Wallace
393
January 24, 2025 | Page 22
City of West Sacramento - Sewer System Management Plan Audit

REQUIREMENT CORRECTIVE ACTION PLAN

FACTOR ACTION NAME
Implementation
• Utilize all available data for prioritizing corrective actions considering severity/consequences of potential spills.
• Maintain documents and recordkeeping of system evaluation and condition assessment inspections and activities. Documentation may include CCTV records, manhole inspection records, lift/pump station inspection records, hydraulic model updates.

Tony Barajas and
James Gray
Effectiveness Track KPI 12 in Attachment F to understand if current corrective actions are adequate to reduce spills. Robert Santos

8.4 CAPITAL IMPROVEMENT PLAN
The capital improvement plan must include the following items:

K.

Project schedules include completion dates for all
portions of the capital improvement program.

Compliance Include a fly-sheet of the CIP (with anticipated and actual completion dates) that can be updated easily. Amber Wallace
Implementation Timelines can and should be adjusted based on changing priorities.

However, reasons for deviation from the plan should be documented. Amber Wallace Effectiveness Track KPI 13 in Attachment F to determine if the capital improvement plan has been adhered to. Amber Wallace
L.

Internal and external project funding sources for
each project.

Compliance Include financing sources and timing on the CIP fly-sheet for each project.

Amber Wallace
Implementation For unfunded projects, list the plan to secure funding for the 10-year CIP.

Amber Wallace
Effectiveness Track KPI 14 in Attachment F to determine if the funding source for each CIP project has been identified and secured. Amber Wallace M.

Joint coordination between operation and
maintenance staff, and engineering staff/consultants
during planning, design, and construction of capital
improvement projects; and Interagency coordination
with other impacted utility agencies.

Compliance
Update the SSMP to include discussion regarding CIP coordination efforts, and update it annually along with other SSMP Elements identified on the Annual SSMP Update Schedule in Attachment G.

Amber Wallace
Implementation
Holding regular project coordination meetings that include all providers and stakeholders to keep projects on track and resolve issues that may arise in a timely manner.

Amber Wallace
Effectiveness
Track KPI 2 in Attachment F to ensure there is an annual review of the Capital Improvement Plan by all necessary individuals including both Engineering and Operations.

Amber Wallace
SECTION 9 – MONITORING, MEASUREMENT AND PROGRAM MODIFICATIONS The SSMP must include an Adaptive Management section that addresses SSMP implementation, effectiveness, and the steps for necessary SSMP improvement, including:
394
January 24, 2025 | Page 23
City of West Sacramento - Sewer System Management Plan Audit

REQUIREMENT CORRECTIVE ACTION PLAN

FACTOR ACTION NAME
A.

Maintaining relevant information, including audit
findings, to establish and prioritize appropriate
activities.

Compliance Retroactively audit the SSMP for periods ending 8/2/2019 and 8/2/2021. Keep them on-hand as required. Amber Wallace
Implementation
Systematic collection of data and storage of data in a manner that it is readily available for analysis is paramount. Storing data in a database is optimal for reporting and data analysis. Storing the data on paper in large volume is cumbersome and difficult to analyze.

Amber Wallace
Effectiveness Track KPIs 1 and 2 in Attachment F to measure whether SSMP has been updated and audited on time. Amber Wallace
B. Monitoring the implementation and measuring the
effectiveness of each SSMP element.

Compliance
Update Chapter 9.1 in the SSMP and develop a consolidated list of KPIs that meet the objectives listed for each Element above. Attachment F serves as an example for the list of KPIs.

Robert Santos
Implementation
• Periodic SSMP review meetings to ensure that the SSMP is being carried out, ensuring staff specified in Element 2 are
included/documented in reviews.
• Graphing historical system performance and spill performance results to assist with evaluating effectiveness.

Robert Santos
Effectiveness (No action.)
C. Assessing the success of the preventive operation
and maintenance activities.

Compliance Describe how the City will measure actual performance against target performance. Robert Santos
Implementation (No action.)
Effectiveness Track KPIs 5 through 10 in Attachment F to measure the success of the preventative operation and maintenance activities. Robert Santos D.

Updating SSMP procedures and activities, as
appropriate, based on results of monitoring and
performance evaluations.

Compliance Update Chapter 9.2 in the SSMP. Robert Santos Implementation
The SSMP is required to be a “living document,” which means it is continually edited and updated (and edits maintained/included in the Change Log). Periodic review is the key. Periodic SSMP review meetings are recommended for ensuring the SSMP is being implemented and carried out.

Robert Santos
Effectiveness Track KPI 2 in Attachment F to measure whether SSMP has been updated on time. Robert Santos
395
January 24, 2025 | Page 24
City of West Sacramento - Sewer System Management Plan Audit

REQUIREMENT CORRECTIVE ACTION PLAN

FACTOR ACTION NAME
E. Identifying and illustrating spill trends, including spill frequency, locations, and estimated volumes.

Compliance
Maintain relevant system performance and spill information at all levels of the sewer program in a way that can be practically evaluated.

Monitor historic spill and system performance trends.

Robert Santos
Implementation Maintain data in a manner that can be reviewed and evaluated makes the data more valuable.

Robert Santos
Effectiveness Track KPI 12 in Attachment F to understand spill trend. Robert Santos ELEMENT 10 – INTERNAL AUDITS
The SSMP shall include internal audit procedures, appropriate to the size and performance of the system, for the City to comply with section 5.4 (SSMP Audits) of the General Order. The City shall conduct an internal audit of its SSMP, and implementation of its SSMP, at a minimum frequency of once every three years. The audit must be conducted for the period after the end of the City’s last required audit period. Within six months after the end of the required 3-year audit period, the Legally Responsible official shall submit an audit report into the online CIWQS Sanitary Sewer System Database per the requirements in section 3.10 (SSMP Audit Reporting Requirements) of Attachment E1 of the General Order. Audit reports submitted to the CIWQS Sanitary Sewer System Database will be viewable only to Water Boards staff. The internal audit shall be appropriately scaled to the size of the system(s) and the number of spills. The City’s sewer system operators must be involved in completing the audit.

A.

At minimum, the audit must:
• Evaluate the implementation and effectiveness of
the City’s SSMP in preventing spills.
• Evaluate the City’s compliance with the General
Order.
• Identify SSMP deficiencies in addressing ongoing
spills and discharges to waters of the State.
• Identify necessary modifications to the SSMP to
correct deficiencies.

Compliance Attach this Audit as an Appendix to the SSMP. Robert Santos Implementation
• Include findings, recommended corrective actions, input from collection system operations staff, and a proposed schedule to address identified deficiencies.
• If established goals are not being met and outcomes are not as intended (or if there are no established goals), then the SSMP is deficient, at least in part.
• Once the audit findings have been determined, distribute findings to operations staff; allow ample time for review; and hold a meeting to discuss and document outcomes of discussion.
• Regularly maintain SSMP Change Log based on modifications necessary to address deficiencies.

Robert Santos,
Tony Barajas, and
James Gray
Effectiveness At a minimum, focus KPIs on measuring each Elements effectiveness in preventing spills and compliance with the General Order.

Robert Santos,
Tony Barajas, and
James Gray
396
January 24, 2025 | Page 25
City of West Sacramento - Sewer System Management Plan Audit

REQUIREMENT CORRECTIVE ACTION PLAN

FACTOR ACTION NAME
B.

The City shall submit a complete audit report that
includes:
• Audit findings and recommended corrective
actions.
• A statement that sewer system operators’ input on
the audit findings has been considered.
• A proposed schedule for the City to address the
identified deficiencies.

Compliance Routinely schedule audits every 3 years. Robert Santos Implementation
Submit complete audit report in CIWQS that includes:
• City SSMP audit findings and recommended corrective actions.

Findings and recommended corrective actions should be formalized in a table or report.
• A statement that sewer system operators’ input on the audit findings has been considered.

Robert Santos
Effectiveness Track KPI 1 in Attachment F for measuring whether SSMP audit deadlines are met. Robert Santos
ELEMENT 11 – COMMUNICATION PROGRAM
The SSMP must include procedures for the City to communicate with:

A.

The public for spills and discharges resulting in
closures of public areas, or that enter a source of
drinking water, and the development,
implementation, update of its SSMP, including
opportunities for public input to SSMP
implementation and updates.

Compliance (No action. In compliance.)
Implementation (No action.)
Effectiveness Track KPI 15 in Attachment F to determine the effectiveness of communicating the SSMP with the public. Robert Santos
B.

Owners/operators of systems that connect into the
City’s system, including satellite systems, for system
operation, maintenance, and capital improvementrelated activities.

Compliance
Describe communication protocols with system owners/operators connecting to the City’s collection system for related operations, maintenance, and capital improvement activities.

Robert Santos
Implementation Document and track communications. Robert Santos Effectiveness (No action.)
397

4.3 Corrective Action Schedule
The City is currently developing a schedule with the plan to correct all deficiencies identified in this audit report prior to the next audit.

4.4 Sewer System Operators’ Input on the Audit Findings In compliance with the General Order Spec 5.4, three workshops were conducted on October 24th, November 19th, and December 9th, 2024, with Amber Wallace (Senior Civil Engineer), Robert Santos (Utilities Maintenance Superintendent), Tony Barajas (Utilities Maintenance Chief), and James Gray (Utilities Maintenance Chief). These workshops aimed to incorporate the opinions of sewer system operators regarding operation and maintenance activities into the SSMP audit findings. The inputs provided by the attendees were included in the initial audit report, which was then reviewed by Amber, Robert, Tony, and James. All comments were addressed and integrated into the final SSMP audit report.

4.5 Disclaimer
BV is providing professional judgement as to the compliance of the City’s Wastewater Collection System Program and are not providing legal assurance of compliance with regulations and requirements. The City is responsible for legal review and compliance of the City’s program and documents with State and Federal requirements.

It was a pleasure working with you on this audit. Please contact Aparna Chatterjee at (925) 949-5940 or me at (916) 642-6124 if you have any questions or need additional clarification.

Very truly yours,
Black & Veatch Corporation
Ashutosh S. Shirolkar, PE
Project Director
398
Attachment A. WDR Compliance Checklist
TARGET DATE DUE DATE ACTION ITEM (CY 2025) COMPLETION DATE Jan. 2025 2/1/2025 Annual Reporting of Cat 4 / Non-Cat 1 Laterals Spills (<50 gallons)
Jan. 2025 2/2/2025 SSMP 3-Year Audit (final
report/certify/upload by LRO)
Mar. 2025 4/1/2025 SERP (review/update prior to completing Annual Report)
Mar. 2025 4/1/2025 Annual Report (draft/final/ upload by LRO) May 2025 6/5/2025 SERP Annual Review/assess
effectiveness/update
Jul. 2025 8/2/2025 2025 SSMP Update (final
report/certify/upload by LRO)
Jul. 2025 – Dec. 2025 12/31/2025 Electronic Sanitary Sewer System Service Area Boundary Map
399
Attachment B. Common General Order Violations

COMPONENT GENERAL ORDER
REFERENCE SECTION COMMON VIOLATIONS1
Element 1: Goal &
Introduction
• Attachment D.1
• Spec. 5.2
• Failure to identify appropriate goals.
• Failure to establish necessary funding, staffing, capital resources for sewer program. • Failure to update SSMP sub-elements.
• Failure to maintain SSMP Change Log.
• Failure to establish process to ensure public has access/input to SSMP. • Failure to complete appropriate SSMP audits.
• Failure to measure effectiveness and progress.
• Failure to develop and implement procedures for updating sewer maps. • Failure to provide appropriate narrative descriptions describing procedures for prioritization of system repairs and maintenance to prevent spills.
• Failure to describe technologies and practices to reduce spills.

Element 2:

Organization
• Attachment D.2
• Spec. 5.1
• Failure to designate a qualified Legally Responsible Official with appropriate training and experience. • Failure to establish and update all related necessary responsible staff and lines of authority. • Failure to establish and update agency chain of communication for reporting spills. • Failure to reflect changes in the SSMP Change Log.

Element 3: Legal
Authority
• Attachment D.3 • Failure to establish proper agency codes, standards, legal agreements, including but not limited to failure to exercise necessary fats, oils, and grease (FOG) control authority for regulating discharges from Food Service Establishments (FSEs), multifamily housing, and residential homes. • Failure to ensure necessary legal authority for accessing flood control channels and easements for ensuring adequate access for spill response and cleanup operations within service area. • Failure to periodically review agency codes, standards, legal agreements, and procedures for ensuring conformance to requirements.

Element 4:

Operations and
Maintenance
Program
• Attachment D.4
• Spec. 5.7
• Spec. 5.19
• Failure to establish process to ensure sewer maps are up to date. • Failure to establish and review required maintenance program activities (CCTV, inspections, etc.) • Failure to establish adequate training program for staff and contractors. • Failure to establish equipment inventory including identification of critical spare part(s), including failure to update SSMP Change Log.
• Failure to change/adapt operations/maintenance program based on actual results/experience. 400

COMPONENT GENERAL ORDER
REFERENCE SECTION COMMON VIOLATIONS1
Element 5: Design
and Performance
Provisions
• Attachment D.5 • Failure to establish, implement, and maintain appropriate sewer standards and procedures for inspections, and testing.
• Failure to enforce instances of noncompliance.
• Failure to document and substantiate deviations from standards and procedures.

Element 6: Spill
Emergency
Response Plan
• Attachment D.6
• Spec. 5.12
• Attachment E-1
• Failure to develop and adapt a Spill Emergency Response Plan that meets all requirements. • Failure to test/evaluate emergency procedures including deploying contracted services where necessary. • Failure to adequately recover wastewater following a spill event. • Failure to ensure supply of adequate critical/identified spare parts/equipment prior to spills. • Failure to properly notify appropriate outside agencies/officials. • Failure to conduct training/drills/skilled volume estimations for operators required in Attachment D.4.3 • Failure to maintain Spill Emergency Response Plan (annually) and note change in the SSMP Change Log.

Element 7: Sewer
Pipe Blockage
Control Program
• Attachment D.7 • Failure to identify appropriate needs for pipe blockage program. • Failure to ensure adequate pipe blockage control enforcement authority. • Failure to enforce requirements for instances of noncompliance.

Element 8: System
Evaluation,
Capacity
Assurance, Capital
Improvements
• Attachment D.8
• Spec. 5.6
• Spec.5.10
• Failure to develop and implement system evaluation, capacity assurance, and capital improvement programs. • Failure to identify sections holding high degree of environmental consequences if vulnerable to collapse, failure, blockage, capacity issues, or other system deficiencies. • Failure to identify system sections located in or within the vicinity of surface waters, steep terrain, high groundwater elevations, and environmentally sensitive areas. • Failure to identify assets within the vicinity of receiving water with a bacterial-related impairment on the most current Clean Water Act section 303(d) List.
• Failure to develop and implement capital improvement plan (CIP) for necessary sewer system repairs and improvements (short term and long-term).
• Failure to include input from field staff regarding known system problems. • Failure to document changes and reason(s) for changes in SSMP Change Log.

Element 9:

Monitoring,
Measurement,
Program
Modifications
• Attachment D.9
• Spec. 5.11
• Failure to collect/maintain and evaluate relevant data for monitoring, measuring, and assessing preventive maintenance program effectiveness.
• Failure to update/modify agency SSMP based on results from internal audits and evaluate/adapt data required for this element.
• Failure to document changes in SSMP Change Log.

Element 10:

Internal Audits
• Attachment D.10 • Failure to conduct routine SSMP audits at a minimum frequency of every three years. 401

COMPONENT GENERAL ORDER
REFERENCE SECTION COMMON VIOLATIONS1
• Failure to measure SSMP element effectiveness (a simple checklist will not fulfill this obligation). (For specific examples of self-audit compliance/noncompliance, visit the following link: https://bacwa.org/wpcontent/uploads/2011/12/BACWA_SSMP- Audits_OE_ppt-12-08-11.pdf • Failure to implement identified deficiencies/recommendations and commit to new enhancements via a plan/schedule (short and long-term).
• Failure to upload and certify the audit report in CIWQS, notify the appropriate Regional Water Board for instances where Audits were not performed, or timelines met, or certify/upload an Audit Report as required.

Element 11:

Communication
• Attachment D.11 • Failure to develop and implement a public communication program, especially during emergencies. • Failure to solicit input on SSMP content.
• Failure to communicate with owners/operators of sewer system(s) connected to the agency’s sewer system. • Failure to document how communications were performed. • Failure to regulatory communicate and document communications with stormwater conveyance system owners within agency service area.
402
Attachment C. System Information
Collection System Information Data Comments
WDID 5SSO11082
Miles of gravity sewer 160.0 miles
Miles of force main 22.0 miles
Total miles of sewer 182.0 miles
Number of lift stations 14
Number of manholes,
cleanouts, and lampholes 12559
The data presented is sourced from the City's
GIS Sewer Geodatabase and schematics. It
comprises 3329 manholes and 9230 cleanouts,
which represent 80-90% of cleanouts in the
city. However, no records pertaining to
lampholes could be located in the
Geodatabase.

Population (US Census 2023
Estimate) 55842
Service Connections 14868
Residential Unknown
Commercial Unknown
Industrial Unknown
403
Attachment D. SSO and Maintenance Records
Table D-1. SSO and Maintenance Records
SSOs per year Number Comments
2015 0
2016 0
2017 12 10 Public Lower Lateral, 2 Manhole
2018 12 9 Public Lower Lateral, 3 Gravity Mainline
2019 10 10 Public Lower Lateral
2020 11 11 Public Lower Lateral
2021 11 11 Public Lower Lateral, 1 Private Lateral
2022 10 1 Public Upper Lateral, 7 Public Lower Lateral, 1 Gravity Mainline, 1 Manhole
2023 3 2 Public Lower Lateral, 1 Manhole
2024** 2
1 Public Lower Lateral, 1 Manhole
** Through June
Total 71
Number of
SSO/100 Mile
of Pipe
Number Comments
2015 0
2016 0
2017 6.6
2018 6.6
2019 5.5
2020 6.0
2021 6.0
2022 5.5
2023 1.6
2024** 1.1 ** Through June
SSO Volume
Volume
Spilled
(gal)
Volume
Recovered
(gal)
Volume That
Reached
Storm Drains
(gal)
Volume That
Reached
Surface
Water (gal)
per 1,000
People Served
(gal/1,000
capita/yr)
Comments
2015 0 0 0 0 0
404
2016 0 0 0 0 0
2017 1,553 1,553 0 0 28
2018 195 195 0 0 3
2019 279 279 0 0 5
2020 328 328 0 0 6
2021 821 821 0 0 15
2022 166 166 0 0 3
2023 290 290 0 0 5
2024** 70 70 0 01
** Through
June
Total 3,768 3,768 0 0
Service Call
Information Number Comments
2021 232
2022 267
2023 267
2024** 252 ** Before 11/22/2024
Hydro Cleaning
(LF) Number Comments
2021 58
2022 57
2023 65
2024** 76 ** Before 11/22/2024
CCTV (LF) Number Comments
2021 69 **
2022 84
2023 111
2024** 105 ** Before 11/22/2024
FOG
Inspections Number Comments
2021 31
2022 67
2023 107
2024** 61 ** Before 11/22/2024
405
PS/LS Quarterly
PMs Performed Number Comments
2021 31 FOG targets
2022 67 FOG targets
2023 107 FOG targets
2024**
61 FOG targets
** Before 11/22/2024
Rehab
/Replacement
Number of Services Comments
2021 47 Services Repairs, Replacements, Installs, and Rehabs 2022 31 Services Repairs, Replacements, Installs, and Rehabs 2023 39 Services Repairs, Replacements, Installs, and Rehabs 2024**
38 Services Repairs, Replacements, Installs, and Rehabs ** Before 11/22/2024
Clean-outs
Installed Number Comments
2021 10
2022 9
2023 4
2024** 17 ** Before 11/22/2024
Table D-2. SSO Data, City Compared to Statewide Data for Similar Size Districts (100 – 199 miles of sewer) Category Years
State
(100-200 miles
of sewer)
City % City Relative to State Comments
SSOs per 100
miles
2024 0.7 1.1 157%
2015-
2023
Annual
Average

2.1 4.2 200%
SSO Volume
Spilled per
1,000 people
(gal/1,000
capita/yr)
2024 17 1 5.9%
2015-
2023
Annual
Average
1342* 7 0.5%
* due to two large spills
in 2021 and 2023,
respectively
406
407
Figure D-1. Number of SSOs per 100 miles (City versus State) Figure D-2. Spill Volume per 1,000 People (City versus State) 0 1
2 3
4 5
6 7
Number of SSOs per 100 Miles
2015 2016 2017 2018 2019 2020 2021 2022 2023
Year
State average (100 - 200 miles system) City
0 100
200
300
400
500
600
700
Spill Volume per 1,000 People (gal)
2015 2016 2017 2018 2019 2020 2021 2022 2023
Year
State Average (100 - 200 miles system) City
408
Attachment E. Spill Data Summary 2015 - 2024

SPILL ID
SPILL

CREATED
DATE

SPILL TYPE SPILL
VOL

SPILL VOL

RECOVER

SPILL VOL

REACH SURF SPILL CAUSE FAILURE LOCATION SPILL LOCATION
833415 2/23/2017 Category 3 20 20 0 Root Intrusion Lower Lateral (Public) 405 10th Street 834106 3/26/2017 Category 3 52 52 0 Root Intrusion Lower Lateral (Public) 837 Morning Glory 838975 7/11/2017 Category 3 50 50 0 Debris-General Lower Lateral (Public) 1029 Elliot Street 837706 7/30/2017 Category 3 15 15 0 Debris from Lateral Lower Lateral (Public) 1039 Park Blvd. 840936 10/10/2017 Category 3 70 70 0 Debris from Lateral Lower Lateral (Public) 1179 Clarendon Street, West Sacramento, CA 95691
841827 11/11/2017 Category 3 94 94 0 Debris-General Lower Lateral (Public) 300 4th Street 841828 11/13/2017 Category 3 8 8 0 Root Intrusion Lower Lateral (Public) 508 3rd Street 841829 11/14/2017 Category 3 905 905 0 Grease Deposition (FOG) Manhole 857 Garnet Street 841830 11/20/2017 Category 3 94 94 0 Debris-General Lower Lateral (Public) 3400 Palomar Avenue 841751 11/25/2017 Category 3 22 22 0 Debris-Rags Manhole 612 Todhunter Ave. 843044 12/14/2017 Category 3 37 37 0 Debris from Lateral Lower Lateral (Public) 1404 Dobros Street 843251 12/28/2017 Category 3 186 186 0 Pipe Structural Problem/Failure Lower Lateral (Public) 614 Andrew Street 844669 2/7/2018 Category 3 10 10 0 Debris-Wipes/Non-Dispersables Lower Lateral (Public) 1511 Delaware Ave, West Sacramento, CA
845288 2/28/2018 Category 3 16 16 0 Debris-Wipes/Non-Dispersables Lower Lateral (Public) 1043 Park Bvld, West Sacramento, CA
845775 3/6/2018 Category 3 12 12 0 Root Intrusion Lower Lateral (Public) 1023 Marston Street 848804 6/28/2018 Category 3 6 6 0 Debris-General Lower Lateral (Public) 2225 Holly Street, West Sacramento
849282 7/17/2018 Category 3 1 1 0 Grease Deposition (FOG) Lower Lateral (Public) 2013 Willow Ave, West Sacramento
851706 10/10/2018 Category 3 120 120 0 Grease Deposition (FOG) Gravity Mainline 317 6th Street, West Sacramento CA
852698 11/5/2018 Category 3 1 1 0 Debris-General Lower Lateral (Public) Resident front yard 409
852834 11/7/2018 Category 3 13 13 0 Grease Deposition (FOG) Gravity Mainline Holly St. @ Maple Street 852837 11/13/2018 Category 3 7 7 0 Debris-General Lower Lateral (Public) 1640 Riverbank Rd. 852831 11/14/2018 Category 3 2 2 0 Other (specify below) Lower Lateral (Public) 644 Kegle Dr. at Cleanout 853200 11/15/2018 Category 3 2 2 0 Debris-General Lower Lateral (Public) 1536 Park Blvd/ 2 feet on property
854971 12/12/2018 Category 3 5 5 0 Grease Deposition (FOG) Gravity Mainline 1341 Somerset Drive 855180 1/5/2019 Category 3 1 1 0 Grease Deposition (FOG) Lower Lateral (Public) 968 Anna St. West Sacramento 859823 6/27/2019 Category 3 187 187 0 Debris-Wipes/Non-Dispersables Lower Lateral (Public) 701 F st. 860900 8/17/2019 Category 3 7 7 0 Debris-Wipes/Non-Dispersables Lower Lateral (Public) 1536 Park Blvd. 860901 8/26/2019 Category 3 5 5 0 Debris-General Lower Lateral (Public) 2143 Evergreen Ave 862562 10/4/2019 Category 3 6 6 0 Grease Deposition (FOG) Lower Lateral (Public) 644 Kegle Dr. 862563 10/15/2019 Category 3 19 19 0 Grease Deposition (FOG) Lower Lateral (Public) 1012 Carrie St. 862564 10/21/2019 Category 3 13 13 0 Debris-General Lower Lateral (Public) 605 James St. 863310 11/23/2019 Category 3 15 15 0 Debris-General Lower Lateral (Public) 1825 Proctor Ave 863493 11/23/2019 Category 3 15 15 0 Grease Deposition (FOG) Lower Lateral (Public) 1825 Proctor Ave 864255 12/17/2019 Category 3 11 11 0 Debris-Wipes/Non-Dispersables Lower Lateral (Public) 709 Todhunter Ave. 864709 1/7/2020 Category 3 30 30 0 Debris-Wipes/Non-Dispersables Lower Lateral (Public) 1813 Proctor Ave 865467 2/12/2020 Category 3 94 94 0 Debris-Wipes/Non-Dispersables Lower Lateral (Public) 940 Joan St. 866571 4/28/2020 Category 3 63 63 0 Root Intrusion Lower Lateral (Public) 432 Myrtle Ave. 867469 5/17/2020 Category 3 19 19 0 Debris-Wipes/Non-Dispersables Lower Lateral (Public) 520 Yolo St 867776 6/19/2020 Category 3 50 50 0 Debris-Wipes/Non-Dispersables Lower Lateral (Public) 1929 Proctor Ave 868220 7/17/2020 Category 3 3 3 0 Grease Deposition (FOG) Lower Lateral (Public) 1039 Park Blvd West Sacramento CA
868955 9/1/2020 Category 3 17 17 0 Debris-General Lower Lateral (Public) 940 Joan St. 870257 10/7/2020 Category 3 14 14 0 Debris-General Lower Lateral (Public) 2017 Michigan Blvd 870493 11/9/2020 Category 3 20 20 0 Root Intrusion Lower Lateral (Public) 932 Cummins Way 871095 11/19/2020 Category 3 12 12 0 Debris-General Lower Lateral (Public) 401 15th St 871098 11/19/2020 Category 3 6 6 0 Debris-General Lower Lateral (Public) 1825 Proctor Ave 410
873126 3/11/2021 Category 3 6 6 0 Grease Deposition (FOG) Lower Lateral (Public) 1148 Delaware Ave 873131 3/20/2021 Category 3 52 52 0 Debris-General Lower Lateral (Public) 1817 Willows St. 873621 3/26/2021 Category 3 19 19 0 Grease Deposition (FOG) Lower Lateral (Public) 1036 Canna Way 874135 4/20/2021 Category 3 26 26 0 Debris-General Lower Lateral (Public) 500 6th St. 874137 4/22/2021 Category 3 100 100 0 Grease Deposition (FOG) Lower Lateral (Public) 1118 Park Blvd. 875937 8/22/2021 Category 3 56 56 0 Debris-General Lower Lateral (Public) 824 Arthur Drive 875957 8/23/2021 Category 3 140 140 0 Debris from Lateral Lower Lateral (Public) 950 Simon Terrace 876502 9/13/2021 Category 3 31 31 0 Root Intrusion Lower Lateral (Public) 740 Julian Street 878507 11/2/2021 Category 3 6 6 0 Debris-General Lower Lateral (Public) 711 Webster Street, West Sacramento, CA
878506 11/28/2021 Category 3 3 3 0 Debris-General Lower Lateral (Public) 2614 Franklin Way, West Sacramento, Ca.
878503 12/6/2021 Category 3 25 25 0 Debris-General Other (specify below) 624 Pecan Street West Sacramento, Ca.
878509 12/20/2021 Category 3 382 382 0 Grease Deposition (FOG) Lower Lateral (Public) 3406 Evergreen Ave 879482 1/30/2022 Category 3 5 5 0 Root Intrusion Lower Lateral (Public) 420 myrtle drive 881997 1/30/2022 Category 3 5 5 0 Root Intrusion Lower Lateral (Public) 420 Myrtle Dr. 881768 2/17/2022 Category 3 49 49 0 Grease Deposition (FOG) Lower Lateral (Public) 1817 Willow Ave. 881998 6/14/2022 Category 3 4 4 0 Grease Deposition (FOG) Lower Lateral (Public) 1400 West Capital Ave 882671 7/13/2022 Category 3 59 59 0 Debris-Wipes/Non-Dispersables Upper Lateral (Public) 1345 Lisbon ave. 882673 8/5/2022 Category 3 3 3 0 Grease Deposition (FOG) Gravity Mainline 2455 West Capitol ave. 883692 10/5/2022 Category 3 16 16 0 Grease Deposition (FOG) Lower Lateral (Public) 521 Westacre 884380 11/8/2022 Category 3 4 4 0 Grease Deposition (FOG) Manhole Briarwood and Oakmont 884378 11/14/2022 Category 3 12 12 0 Grease Deposition (FOG) Lower Lateral (Public) 1037 Elliot street 884379 11/18/2022 Category 3 9 9 0 Grease Deposition (FOG) Lower Lateral (Public) 1035 Jefferson Blvd. 891662 9/5/2023 Monthly
Category 3 Spill 91 93 0 Debris-wipes/Non-disposables Lower Lateral 1501 West Capitol Ave. 891692 11/7/2023 Monthly
Category 3 Spill 106 106 0 Debris-wipes/Non-disposables Gravity Mainline,Manhole 427 D street 411
891661 11/20/2023 Monthly
Category 3 Spill 93 93 0 Debris-wipes/Non-disposables Lower Lateral 1501 West Capitol Ave. 894340 2/16/2024 Category 4 Spill 3 3 0 Manhole 5th street and F street 894342 2/27/2024
EnrolleeOwned/Operated
Lateral Spill
9 9 0 Root Intrusion Lower Lateral (property
cleanout) 500 Walnut street
894343 3/9/2024
EnrolleeOwned/Operated
Lateral Spill
10 2 0 Debris-General Lower Lateral (property
cleanout) 1804 Manzanita
894892 4/4/2024
EnrolleeOwned/Operated
Lateral Spill
22 22 0 Fats, Oil and Grease (FOG) Lower Lateral (residential cleanout) 781 Fairway Dr.
894895 5/13/2024 Monthly
Category 3 Spill 67 67 0
Debris-wipes/Nondisposables,Fats, Oil and Grease
(FOG)
Lower Lateral (Public) 820 Hardy
412
Attachment F. Key Performance Indicators
No. Component Key Performance
Indicator Description (Data Source) SSMP Element(s)
Current
Performance
Target
Performance

1. Regulatory
Compliance
WDR Compliance
Deadlines Overdue
No. of WDR deadlines overdue in the past 3
years (WDR Compliance Schedule) 2 0

2. Regulatory
Compliance Up to Date SSMP Percentage of SSMP Elements updated annually (Annual SSMP Update Schedule) 0% 100%

3. Legal Municipal Code
Adequacy Existing code age (Municipal Code) 1 < 10 years

4. Legal Design Standards and
Specifications Adequacy
Existing design standards, specifications, &
details age (Standard Specs & Details)
22 < 10 years

5. O&M Work Order (WO)
Compliance
[Scheduled preventative & corrective
maintenance WOs completed] / [Total WOs
scheduled] (Webworks)
N/A* 90%

6. O&M CCTV Inspections
Workorder Compliance
[LF of inspections completed] / [LF of
inspections scheduled] (Webworks) N/A* 90%

7. O&M Spill Response Average annual spill response time (SSO Reports/Webworks)
~1 hr 30 mins

8. O&M Spill Containment Spill volume that reaches surface water (CIWCS)
0 0 gallons

9. O&M Outreach/Source
Control Effectiveness
Annual number of ragged pumps
(Webworks)
N/A* 4

10. O&M Cleaning Effectiveness Number of blockage related SSOs (CIWCS) 3 TBD

11. Capacity Adequate Capacity Number of capacity related SSOs in past 10 years (CIWCS) N/A* 0

12. O&M SSO Trend [Annual number of SSOs] – [Previous 3-year average number of SSOs] (CIWCS) -3 <0

13. CIP Corrective Actions
[2-year number of improvements made] /
[Number of improvements scheduled to be
completed in past 2 years]
N/A* 90%
413
No. Component Key Performance
Indicator Description (Data Source) SSMP Element(s)
Current
Performance
Target
Performance

14. CIP Adequate Funding Percentage of 2-year CIP without Funding Sources (CIP List) N/A* 0%

15. Communication Public Communication Years since SSMP was last placed on the agenda for a regular council meeting 0% 6 years
* The notation "N/A" signifies that the data is currently unavailable. However, it should be noted that the City is actively collecting this information.
414
Attachment G. Annual SSMP Update Schedule
Annual SSMP Update Date Completed in
2025 Date Completed in 2026 Date Completed in 2027

THREE YEAR

AVERAGE
Sanitary Sewer System Maps
Organization Map
Contact Information
Equipment Inventory
Spill Emergency Response Plan
Capital Improvement Plan
Up-to-Date SSMP Compliance KPI: # Completed/6 # Completed/6 # Completed/6 # Completed/6 415
Appendix D

ANNUAL SSMP CHANGE LOG AND TRACKING SHEET
416

ANNUAL SSMP CHANGE LOG AND TRACKING SHEET
Date Responsible Person/Title DescripƟon of AcƟvity/Change IniƟals

417

ANNUAL SSMP CHANGE LOG AND TRACKING SHEET
Date Responsible Person/Title DescripƟon of AcƟvity/Change IniƟals

418
Appendix E

SEWER OPERATING FUND HISTORY SUMMARY REPORT
419
Col 1: 2024-2025 B Col 2: 2023-2024 B Col 3: 2022-2023 B Col 4: 2021-2022 B Col 5: 2020-2021 B Col 6: 2019-2020 B Starting Fund: 501
Ending Fund:

Starting Activity: 9410
Ending Activity:

Starting Object: 5000
Ending Object: 5999
Program: All
Report Selection Criteria:
420
Fund:

Activity:
501
9410
Sewer Operating Fund
Sewer Collection 2024-2025
Budgets
2023-2024
Budgets
2022-2023
Budgets
2021-2022
Budgets
2020-2021
Budgets
2019-2020
Budgets
5111 Salaries/Wages-Regular 962,285.83 870,950.27 875,685.00 727,027.00 750,925.00 709,280.00 5113 Salaries/Wages-O/T & Standby 85,000.00 85,000.00 85,000.00 85,000.00 85,000.00 84,000.00 5114 Salaries/Wages-Other /PERS 46,366.84 46,182.32 40,263.00 39,479.00 35,028.00 33,702.00 5115 Salaries/Wages-Vacation Pay 0.00 0.00 0.00 0.00 8,268.00 0.00 5116 Salaries/Wages-Holiday Pay 0.00 0.00 0.00 0.00 993.00 0.00 5117 Salaries/Wages-Sick Leave 0.00 0.00 0.00 0.00 11,713.00 0.00 5118 Salaries/Wages-Other/Non PERS 62,480.93 60,015.89 46,939.00 20,660.00 22,616.00 30,648.00 5121 Medicare 14,256.83 14,113.49 11,484.00 11,374.00 12,884.00 11,876.00 5122 Retirement-P.E.R.S. 240,750.61 224,828.73 216,371.00 205,539.00 187,354.00 161,837.00 5130 Employee Health Ins 240,708.92 229,375.88 181,757.25 173,275.75 168,544.00 183,123.00 5131 Retired Employee Health Ins 33,421.00 31,235.00 45,532.00 43,364.00 50,758.00 49,035.00 5132 Workers Comp Ins 33,107.17 30,145.60 44,824.00 100,489.00 64,972.99 76,191.00 5133 Deferred Compensation 942.21 942.21 445.00 424.00 392.00 373.00 5135 Retiree Health Savings 1,875.00 1,875.00 1,125.00 1,125.00 0.00 0.00 5136 OPEB ADC Contribution 0.00 18,584.44 4,825.00 4,751.00 0.00 0.00 5195 Retiree Health Reimb Offset 0.00 (31,235.00) 0.00 0.00 0.00 0.00 Personnel Services Total:: 1,721,195.34 1,582,013.83 1,554,250.25 1,412,507.75 1,399,447.99 1,340,065.00 5212 Small Tools/Instruments 9,000.00 9,000.00 5,000.00 10,000.00 10,000.00 10,000.00 5215 Safety Clothing/Supplies 21,600.00 21,800.00 71,820.00 68,660.00 17,000.00 13,000.00 5220 IT Communications 0.00 0.00 0.00 0.00 4,500.00 4,467.00 5221 Communications 7,642.00 3,300.00 4,545.00 4,500.00 0.00 0.00 5222 Utilities 230,000.00 210,000.00 300,750.00 278,500.00 250,000.00 250,000.00 5223 IT Printing/Copies 0.00 0.00 0.00 0.00 2,600.00 2,564.00 5240 Maintenance-Equipment 90,224.00 65,200.00 45,405.00 24,605.00 36,000.00 34,000.00 5241 Maintenance-Structures/Grounds 113,500.00 72,500.00 126,366.70 51,410.00 32,524.00 134,715.00

Page 2 of 4 ends