California’s Greenhouse Gas Sources and Relative Contribution In 2025, the statewide GHG emissions inventory was updated for 2000 to 2023 emissions using the GWPs in IPCC’s AR4 and reported that California produced 360.4 MMTCO2e GHG emissions in 2023 (3.0 percent lower than 2022 levels). Since peak levels in 2004, California’s GHG emissions have generally followed a decreasing trend. By 2014, statewide GHG emissions dropped below the 2020 GHG limit (AB 32 target for year 2020) and have remained below that limit ever since. Additionally, the carbon intensity of California’s economy (the amount of carbon pollution per million dollars of gross state product) is declining.

California’s transportation sector remains the largest source of GHG emissions, producing

37.1 percent of the state’s total emissions. Industrial sector emissions make up 18.6 percent, and electric power generation make up 15.9 percent of the state’s emissions inventory. Other major sectors of GHG emissions include residential and commercial (12.0 percent), agriculture and forestry (8.1 percent), high GWP emissions (5.9 percent), and recycling and waste (2.4 percent).

Emissions from the transportation sector (e.g., on-road vehicles) have generally decreased since their peak in 2002, but this sector has experienced periods of growth and decline. A decrease through 2023 was primarily due to reductions from on-road sources, likely from an increased use in EVs and more fuel-efficient vehicles over that timeframe, and the subsequent decrease in the Riverview Marketplace Commercial Project
Environmental Impact Report 4.8 Greenhouse Gas Emissions City of Bakersfield – SCH No. 2025101507 4.8-13
amount of fuel used. Electricity emissions also have decreased since the early 2000s due to the deployment of renewable and less carbon-intensive resources, leading to reduced dependence on fossil-fuel electricity generation. Emissions from the industrial sector decreased from 2022, largely due to the continued downward trend in oil and gas production.

Human Influence on Climate Change
For approximately 1,000 years before the Industrial Revolution, the amount of GHGs in the atmosphere remained relatively constant. During the 20th century, however, scientists observed a rapid change in the climate and the quantity of climate change pollutants in the Earth’s atmosphere that is attributable to human activities.

The recent IPCC Sixth Assessment Report (AR6) summarizes the latest scientific consensus on climate change. It finds that atmospheric concentrations of CO2 have increased by 50 percent since the Industrial Revolution and continue to increase at a rate of two parts per million each year. By the 2030s, and no later than 2040, the world will exceed 1.5°C warming. These recent changes in the quantity and concentration of climate change pollutants far exceed the extremes of the ice ages, and the global mean temperature is warming at a rate that cannot be explained by natural causes alone. Human activities are directly altering the chemical composition of the atmosphere through the buildup of climate change pollutants. In the past, gradual changes in the Earth’s temperature changed the distribution of species, availability of water, and other conditions.

Human activities are accelerating this process so that environmental impacts associated with climate change no longer occur in a geologic time frame but within a human lifetime.

Like the variability in the projections of the expected increase in global surface temperatures, the environmental consequences of gradual changes in the Earth’s temperature are hard to predict.

Projections of climate change depend heavily upon future human activity. Therefore, climate models are based on different emission scenarios that account for historical trends in emissions and on observations of the climate record that assess the human influence of the trend and projections for extreme weather events. Climate-change scenarios are affected by varying degrees of uncertainty. For example, there are varying degrees of certainty on the magnitude of the trends for:
• Warmer and fewer cold days and nights over most land areas. • Warmer and more frequent hot days and nights over most land areas. • An increase in frequency of warm spells/heat waves over most land areas. • An increase in frequency of heavy precipitation events (or proportion of total rainfall from heavy falls) over most areas.
• Larger areas affected by drought.
• Intense tropical cyclone activity increases.
• Increased incidence of extreme high sea level (excluding tsunamis).

Potential Climate Change Impacts for California
There is at least a greater than 50 percent likelihood that global warming will reach or exceed

1.5°C in the near-term, even for the very low GHG emissions scenario (IPCC 2022). Climate change is already impacting California and will continue to affect it for the foreseeable future. For example, the average temperature in most areas of California is already 1°F (~0.56°C) higher than historical levels, and some areas have seen average increases in excess of 2°F (~1.1°C).

Riverview Marketplace Commercial Project
Environmental Impact Report 4.8 Greenhouse Gas Emissions City of Bakersfield – SCH No. 2025101507 4.8-14
The California Fourth Climate Change Assessment identifies the following climate change impacts under a business-as-usual scenario, in which no new actions are taken to curb GHG emissions:
• Annual average daily high temperatures in California are expected to rise by 2.7°F by 2040, 5.8°F by 2070, and 8.8°F by 2100 compared to observed and modeled historical conditions. These changes are statewide averages. Heat waves are projected to become longer, more intense, and more frequent.
• Warming temperatures are expected to increase soil moisture loss and lead to drier seasonal conditions. Summer dryness may become prolonged, with soil drying beginning earlier in the spring and lasting longer into the fall and winter rainy season. • High heat increases the risk of death from cardiovascular, respiratory, cerebrovascular, and other diseases.
• Droughts are likely to become more frequent and persistent through 2100.4 • Climate change is projected to increase the strength of the most intense precipitation and storm events affecting California.
• Mountain ranges in California are already seeing a reduction in the percentage of precipitation falling as snow. Snowpack levels are projected to decline significantly by 2100 due to reduced snowfall and faster snowmelt.
• Marine layer clouds are projected to decrease, though more research is needed to better understand their sensitivity to climate change.
• Extreme wildfires (i.e., fires larger than 10,000 hectares or 24,710 acres) would occur 50 percent more frequently. The maximum area burned statewide may increase 178 percent by the end of the century.
• Exposure to wildfire smoke is linked to increased incidence of respiratory illness. • Sea level rise is expected to continue to increase erosion of beaches, cliffs, and bluffs. (CalOES 2020)
Global climate change risks to California include impacts to public health, water resources, agriculture, coastal sea level, forest and biological resources, and energy.

The issue of global climate change is, by definition, a cumulative environmental impact. The San Joaquin Valley Air Pollution Control District (SJVAPCD) adopted Guidance Methodology for addressing GHG emissions under CEQA on December 17, 2009 (SJVAPCD 2009b). In addition, SJVAPCD adopted a Climate Change Action Plan to identify strategies to reduce GHG emissions in the San Joaquin Valley Air Basin. SJVAPCD’s methodology includes a tiered approach:
• If a project is exempt from CEQA, individual-level and cumulative GHG emissions are treated as less than significant.
• If the project complies with a GHG emissions reduction plan or mitigation programs that avoid or substantially reduce GHG emissions in the geographic area where the project is located (i.e., city or county), individual-level and cumulative GHG emissions are treated as less than significant.
• SJVAPCD does not have thresholds of significance for construction-related GHG emissions. Construction emissions are one-time, nonrecurring emissions. For buildings in 4 Overall, California has become drier over time, with five of the eight years of severe to extreme drought occurring between 2007 and 2016, and with unprecedented dry years in 2014 and 2015 (OEHHA 2018). Statewide precipitation has become increasingly variable from year to year, with the driest consecutive four years occurring from 2012 to 2015 (OEHHA 2018).

Riverview Marketplace Commercial Project
Environmental Impact Report 4.8 Greenhouse Gas Emissions City of Bakersfield – SCH No. 2025101507 4.8-15
general, it is reasonable to look at a 30-year time frame, since this is a typical interval before a new building requires its first major renovation. Therefore, construction emissions are amortized over a 30-year duration and included in the operational emissions analysis.

SJVAPCD’s methodology for evaluating GHG emissions impacts also includes methodology to evaluate whether a project would comply with AB 32 by conducting an analysis of whether the project would reduce GHG emissions by 29 percent from business as usual through implementation of “best performance standards.” The November 30, 2015, Center for Biological Diversity v. California Department of Fish and Wildlife (62 Cal.4th 204) ruling effectively limits use of this performance metric. The 29 percent below business as usual established in the CARB Scoping Plan is derived from the statewide reduction target set by AB 32 for year 2020. The court held that the 29 percent is the statewide goal, but there is no substantial evidence that establishes a nexus between the statewide goal and the percentage reduction a specific land use project would need to achieve to be consistent with the goals of AB 32. Projects must determine the reduction target specific to the land use type being proposed.

Because SJVAPCD’s significance criteria do not establish a nexus that connects the statewide GHG emissions reductions identified in the Scoping Plan to reductions needed for new development projects, an alternate approach to use of the performance metric is utilized until SJVAPCD revises their Guidance Methodology to address the Newhall Ranch ruling. For purposes of this analysis, the Project is evaluated to a net zero threshold to determine potential GHG emissions impacts. While this net zero threshold approach is conservative, it aligns with the State’s carbon neutrality goal under AB 1279. Use of this threshold does not require the Project to independently achieve net-zero operational emissions where all feasible mitigation has been incorporated, and the City adopts appropriate CEQA findings.

Mass Emissions and Health Effects
On December 24, 2018, in Sierra Club et al. v. County of Fresno et al. (6 Cal. 5th 502) (Friant Ranch), the California Supreme Court determined that the EIR for the proposed Friant Ranch project failed to adequately analyze the project’s air quality impacts on human health. The EIR prepared for the project, which involved a master planned retirement community in Fresno County, showed that project-related mass emissions would exceed the SJVAPCD’s regional significance thresholds. In its findings, the California Supreme Court affirmed the holding of the Court of Appeals that EIRs for projects must not only identify impacts to human health but provide an “analysis of the correlation between the project's emissions and human health impacts” related to each criteria air pollutant that exceeds the regional significance thresholds or explain why it could not make such a connection. In general, the ruling focuses on the correlation of emissions of toxic air contaminants and criteria air pollutants and their impact to human health.

In 2009, the EPA issued an endangerment finding for six GHGs (CO2, CH4, N2O, HFCs, PFCs, and SF6) in order to regulate GHG emissions from passenger vehicles. The endangerment finding is based on evidence that shows an increase in mortality and morbidity associated with increases in average temperatures, which increase the likelihood of heat waves and ozone levels. The effects of climate change are identified in Table 5. While identified effects such as sea level rise and increases in extreme weather can indirectly impact human health, neither the EPA nor CARB has established ambient air quality standards for GHG emissions. The state’s GHG reduction strategy outlines a path to avoid the most catastrophic effects of climate change. Yet the state’s GHG reduction goals and strategies are based on the state’s path toward reducing statewide cumulative GHGs as outlined in AB 32, SB 32, AB 1279, and Executive Order S-03-05. Because no single project is large enough to result in a measurable increase in global concentration of Riverview Marketplace Commercial Project
Environmental Impact Report 4.8 Greenhouse Gas Emissions City of Bakersfield – SCH No. 2025101507 4.8-16
GHG emissions, climate change impacts of a project are considered on a cumulative basis.

Without federal ambient air quality standards for GHG emissions and given the cumulative nature of GHG emissions, it is not feasible at this time to connect the project’s specific GHG emission to the potential health impacts of climate change.

4.8.3 Impact Analysis
Methodology
The GHG evaluation was prepared in accordance with the requirements of CEQA to determine if significant GHG impacts are likely in conjunction with the type and scale of development associated with the proposed Project. Air pollutant and GHG emissions are calculated using the California Emissions Estimator Model (CalEEMod), version 2022.1. CalEEMod compiles an emissions inventory of construction (fugitive dust, off-gas emissions, on-road emissions, and off-road emissions), area sources, indirect emissions from energy use, mobile sources, indirect emissions from waste disposal (annual only), and indirect emissions from water/wastewater (annual only).

The operational-phase, project-related emissions are based on development of the new proposed commercial and retail land uses. The modeling accounts for the average daily vehicle trips generated, energy usage, water demand, and wastewater and solid waste generation from operation of the proposed Project. Construction emissions are based on information provided for the Project. Where specific information was not available, CalEEMod default values were utilized.

Life cycle emissions are not included in this analysis because not enough information is available.5 • Transportation. The project-related weekday and weekend average daily trip generation data and vehicle miles traveled (VMT) data are provided by Integrated Engineering Group in Appendix H. Project-related VMT, including those associated with light-, medium-, and heavy-duty trucks, was calculated using the KernCOG regional travel demand model, which, in general, is calibrated to account for truck travel distinct from travel associated with passenger vehicles. Transportation criteria pollutant and GHG emissions are based on CalEEMod default vehicle emissions. The modeled fleet mix is based on vehicle fleet mix data provided by IEG and CalEEMod default fleet mix data. The primary source of mobile criteria air pollutants and GHG emissions is tailpipe exhaust emissions from the combustion of fuel (i.e., gasoline and diesel). In addition, for criteria air pollutants, brake and tire wear along with fugitive dust created from vehicles traveling roadways also generate particulate matter.
• Energy Use. Electricity and natural gas demand for the proposed Project is based on CalEEMod default energy rates. Per the Project applicant, the proposed onsite PV systems would generate an anticipated 1,201,933 kilowatt hour (kWh) per year of renewable electricity. For purposes of this analysis, the CalEEMod default electricity demand for the regional shopping center land use is reduced by the anticipated 1,201,933 kWh per year of renewable electricity. Use of natural gas would generate both criteria 5 Life cycle emissions include indirect emissions associated with materials manufacture. However, these indirect emissions involve numerous parties, each of which is responsible for GHG emissions of their particular activity. The California Resources Agency, in adopting the CEQA Guidelines Amendments on GHG emissions found that lifecycle analysis was not warranted for project-specific CEQA analysis in most situations, for a variety of reasons, including lack of control over some sources, and the possibility of double-counting emissions (see Final Statement of Reasons for Regulatory Action, December 2009). Because the amount of materials consumed during the operation or construction of the proposed project is not known, the origin of the raw materials purchased is not known, and manufacturing information for those raw materials is also not known, calculation of life cycle emissions would be speculative. A life-cycle analysis is not warranted (LCI 2008).

Riverview Marketplace Commercial Project
Environmental Impact Report 4.8 Greenhouse Gas Emissions City of Bakersfield – SCH No. 2025101507 4.8-17
pollutant and GHG emissions, and use of electricity would contribute to GHG emissions generation.
• Water/Wastewater. Water demand data for the proposed Project is based on and derived from the water supply and demand analysis. In total, the proposed project is estimated to use 148,925 gallons per day and 54,357,625 gallons per year. GHG emissions from this sector are attributed to the electricity used for treatment and distribution of water and wastewater.
• Solid Waste. Solid waste generation for the proposed uses is based on CalEEMod defaults. GHG emissions are associated with the decomposition of solid waste. • Area Sources. Area source emissions from use of consumer cleaning products and VOC emissions from paints are based on CalEEMod default values and the square footage of the proposed buildings.
• Refrigerants. GHG emissions from operation of building air conditioning and refrigeration equipment are based on CalEEMod default values based on land use type. • Construction. Appendix B shows the assumed construction activities, phasing, and construction equipment based on information provided by the project applicant and CalEEMod defaults. Demolition debris generated from the left turn lane installation would result in the export of 575 tons of demolition debris. The Project Site would be a balanced site and site preparation and grading activities would not result in export or import of soil.

Emissions of VOCs would primarily be from the application of paints, asphalt pavement, and operation of construction vehicles and off-road equipment. Emissions of NOX, CO, and SOX would primarily be generated from operation of off-road construction equipment as well as construction worker and vendor vehicles. Coarse and fine particulate matter (PM10 and PM2.5) exhaust emissions would also be generated from operation of off-road construction equipment and construction and vendor vehicle trips. Fugitive dust emissions of PM10 and PM2.5 would be generated from ground disturbance activities and asphalt demolition.

The following thresholds of significance are based on the Environmental Checklist contained in Appendix G of the CEQA Guidelines.

Thresholds of Significance
The City utilizes the California Environmental Quality Act (CEQA) Guidelines, Appendix G, and thresholds of significance6to analyze the environmental impacts of the Project. Per CEQA Guidelines, an impact is considered significant if the Project would:
• Generate GHG emissions, either directly or indirectly, that may have a significant impact on the environment.
• Conflict with an applicable plan, policy or regulation adopted for the purpose of reducing the emissions of GHGs.
6 Association of Environmental Professionals (AEP). 2025. CEQA Guidelines Appendices, Appendix G: Environmental Checklist Form. Available
at: https://www.califaep.org/docs/CEQA_Handbook_2025combined.pdf. Accessed January 2026.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.8 Greenhouse Gas Emissions City of Bakersfield – SCH No. 2025101507 4.8-18
Project Impacts
Threshold GHG-1: Would the project generate greenhouse gas emissions, either directly or indirectly, that may have a significant impact on the environment? Impact Analysis
Global climate change is not confined to a particular project area and is generally accepted as the consequence of global industrialization over the last 200 years. A typical project, even a very large one, does not generate enough greenhouse gas emissions on its own to influence global climate change significantly; hence, the issue of global climate change is by definition a cumulative environmental impact.

Operation of the Project would generate GHG emissions from vehicle trips, water demand, wastewater and solid waste generation, area sources (e.g., consumer cleaning products), energy usage (i.e., natural gas and electricity), and refrigerants. The Project operational emissions for each phase of development and full buildout are shown in Table 4.8-2, Project Operation GHG Emissions Inventory. As shown in the table, the primary source of project-related emissions would be from mobile-source emissions generated from Project vehicle trips (e.g., employees and patrons). The next largest sources of emissions would be from energy usage, followed by the solid waste and water sectors. Overall, development of the Project would generate annual operational phase GHG emissions of 16,027 MTCO2e per year under full buildout year conditions and would not achieve net zero GHG emissions.

Compliance with SJVAPCD’s Rule 9410 eTRIP program for individual businesses in which the program would apply could contribute to reducing Project-related vehicle trips and mobile sources to the extent feasible. However, it is not anticipated that compliance with Rule 9410 would result in the reductions needed to achieve net zero for the Project. Overall, GHG emissions generated by the Project would be considered to cumulatively contribute to statewide GHG emissions.

Impacts would be significant.

Table 4.8-2 Project Operation GHG Emissions Inventory
Source
GHG Emissions
(MTCO2e Per Year) (Percent)
Phase 1 (2026 Opening Year)
Mobile1,2 13,481 94%
Area 5 <1%
Energy 644 4%
Water 75 1%
Solid Waste 194 1%
Refrigerants 19 <1%
Amortized Construction (30-years) 12 <1%
Total All Sectors 14,431 100%
Phase 2 (2027 Opening Year)
Mobile1,3 1,709 91%
Area 1 <1%
Energy 128 7%
Water 19 1%
Solid Waste 29 2%
Refrigerants <1 <1%
Amortized Construction (30-years) 6 <1%
Total All Sectors 1,892 100%
Riverview Marketplace Commercial Project
Environmental Impact Report 4.8 Greenhouse Gas Emissions City of Bakersfield – SCH No. 2025101507 4.8-19
Source
GHG Emissions
(MTCO2e Per Year) (Percent)
Full Buildout (2027 Opening Year)
Mobile1,3 14,894 93%
Area 6 <1%
Energy 773 5%
Water 94 1%
Solid Waste 223 1%
Refrigerants 19 <1%
Amortized Construction (30-years) 18 <1%
Total All Sectors 16,027 100%
Net Zero Threshold 0 MTCO2e N/A
Exceeds Threshold? Yes N/A
Source: CalEEMod, Version 2022.1.

Notes: Manual summation of values may not equal to the shown totals due to rounding. 1 Based on trip generation, VMT, and vehicle fleet mix data provided by Integrated Engineering Group (2026). 2 Based on calendar year 2026 emissions data.
3 Based on calendar year 2027 emissions data.

Mitigation Measures
MM GHG-1 The project proponent/developer shall design and construct the proposed buildings to be all electric, with electricity to be the only permanent source of energy for all nonemergency building energy needs, including but not limited to water heating; mechanical equipment; and heating, ventilation, and air conditioning (HVAC) (i.e., space-heating and space cooling). All major appliances (e.g., dishwashers, refrigerators, and water heaters) provided/installed shall be electric-powered EnergyStar certified or an equivalent energy efficiency where applicable. The only exception to this measure shall be limited to commercial cooking uses. Prior to issuance of building permits for development projects, project proponent/developer shall provide plans that show the aforementioned requirements to the City of Bakersfield Building Division. Prior to issuance of the certificate of occupancy, the City of Bakersfield Building Division shall verify installation of the electric-powered EnergyStar or equivalent appliances.

MM GHG-2 Prior to issuance of the certificate of occupancy, the property owner shall provide documentation to the City of Bakersfield Building Division demonstrating enrollment in a 100 percent carbon-free electricity energy plan, such as the Pacific Gas & Electric’s (PG&E) 100% Solar Choice plan, for proposed project building(s) if such plan is available. If a 100 percent carbon-free electricity plan is not available, the property owner shall enroll in an energy plan with the next highest carbon-free electricity until a 100 percent carbon-free electricity energy plan becomes available. Measures to achieve 100 percent carbon-free electricity use may include, but are not limited to, plans for 100 percent renewable electricity. If such carbon-free electricity energy plans are waitlisted, the property owner may enroll in an available energy plan in the meantime, but shall sign up for the waiting list for and enroll in a carbon-free electricity energy plan when it becomes available.

MM GHG-3 All landscaping equipment (e.g., leaf blower) used for property management shall be electric-powered only. Prior to issuance of the first certificate of occupancy, the property owner shall provide documentation (e.g., purchase, rental, and/or services agreement) to the City of Bakersfield Building Division to verify that all landscaping equipment utilized will be electric-powered.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.8 Greenhouse Gas Emissions City of Bakersfield – SCH No. 2025101507 4.8-20
MM GHG-4 Any off-road equipment (e.g., forklifts) used in daily business operations shall be electric-powered. The project proponent/developer shall disclose this requirement to all tenants/business entities prior to the signing of any lease agreement. In addition, the limitation to use only electric-powered off-road equipment shall be included in all leasing agreements.

Prior to issuance of a Business License for a new tenant/business entity, the project proponent/developer and tenant/business entity shall provide a signed document (verification document) to the City of Bakersfield (City) noting that the property owner has disclosed to the tenant/business entity the requirement to use only electric-powered equipment for daily operations. This verification document shall be signed by authorized agents for the project proponent/developer and tenant/business entities. In addition, if applicable, the tenant/business entity shall provide documentation (e.g., purchase or rental agreement) to the City to verify, to the City’s satisfaction, that any off-road equipment utilized will be electric-powered.

MM GHG-5 The project proponent/developer shall coordinate with Golden Empire Transit and provide improvements (e.g., bus shelter) of up to two bus stops. Prior to issuance of the first certificate of occupancy, the project proponent/developer shall provide documentation to the City of Bakersfield Building Division to verify, to the City’s satisfaction, that coordination with Golden Empire Transit has been initiated.

MM GHG-6 The project proponent/developer shall install an end-of-trip shower facility. This end-of-trip shower facility requirement shall be incorporated into all site plans and appropriate building plans and submitted to the City of Bakersfield Building Division. Prior to issuance of the certificate of occupancy, the City of Bakersfield Building Division shall verify the installation of end-of-trip shower facility.

MM GHG-7 The project proponent/developer shall design the parking areas to comply with the Tier 2 Nonresidential Voluntary Measures of the California Green Building Standards Code (CALGreen), Division A5.1, Planning and Design, Section A5.106.5.3.4. This requirement shall be identified on all prepared building and site plans. The project proponent/developer shall submit these building and site plans that note this requirement to the City of Bakersfield Building Division prior to the issuance of construction permits.

Table 4.8-3, Project Operation GHG Emissions Inventory With Reduction Measures GHG-1 and GHG-3, shows the Project-related annual emissions at full buildout with incorporation of Reduction Measure GHG-1 (all-electric building systems and appliances) and Reduction Measure GHG-3 (electric-powered landscaping equipment) in addition to the net change compared to the project-related annuals emissions at full buildout without the reduction measures. Implementation of MM GHG-1 and GHG-3 would contribute to supporting and encouraging use of electricity instead of natural gas or other liquid fuels, which would minimize on-site generation of GHG emissions. As shown in Table 4.8-3, implementation of MM GHG-1 and GHG-3 would reduce project-related GHG emissions by 102 MTCO2e/yr. However, these two mitigation measures would not reduce Project-related emissions to achieve net zero. Overall, the other mitigation measures would help contribute to reducing operation-related Project GHG emissions to the extent feasible.

For example, MM GHG-2 would contribute to increasing use of carbon-free renewable electricity and supplement the on-site renewable electricity generated by the proposed on-site PV systems.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.8 Greenhouse Gas Emissions City of Bakersfield – SCH No. 2025101507 4.8-21
Additionally, MM GHG-5 and GHG-6 would result in active and public transit facility improvements and encourage active transit and public transit use, which would contribute to reducing passenger VMT. Furthermore, MM GHG-7 would result in increased EV charging infrastructure improvements and support use and adoption of EVs. Overall, although implementation of reduction measures would reduce Project-related GHG emissions to the extent feasible, operation of the proposed Project is still anticipated to generate GHG emissions and would not achieve the net zero threshold. Thus, Project-related GHG emissions would have a substantial cumulative contribution to GHG emissions impacts.

Table 4.8-3 Project Operation GHG Emissions Inventory With Reduction Measures GHG-1 and GHG-3
Source
GHG Emissions
(MTCO2e Per Year) (Percent)
Full Buildout (2027 Opening Year) Without
Mitigation
Mobile1,2 14,894 93%
Area 6 <1%
Energy 773 5%
Water 94 1%
Solid Waste 223 1%
Refrigerants 19 <1%
Amortized Construction (30-years) 18 <1%
Total All Sectors 16,027 100%
Full Buildout (2027 Opening Year) With
Mitigation
Mobile1,2 14,894 93%
Area3 0 0%
Energy4 677 4%
Water 94 1%
Solid Waste 223 1%
Refrigerants 19 <1%
Amortized Construction (30-years) 18 <1%
Total All Sectors 15,926 100%
Net Zero Threshold 0 MTCO2e N/A
Exceeds Threshold? Yes N/A
Net Change
Mobile 0 N/A
Area (6) N/A
Energy (96) N/A
Water 0 N/A
Solid Waste 0 N/A
Refrigerants 0 N/A
Amortized Construction (30-years) 0 N/A
Total All Sectors (102) N/A
Source: CalEEMod, Version 2022.1.

Notes: Manual summation of values may not equal to the shown totals due to rounding. 1 Based on trip generation, VMT, and vehicle fleet mix data provided by Integrated Engineering Group (2026). 2 Based on calendar year 2027 emissions data.
3 Includes implementation of Reduction Measure GHG-3, which requires all landscaping equipment to be electric-powered. 4 Includes implementation of Reduction Measure GHG-1, which requires all-electric building systems and appliances for land uses except for commercial cooking uses.

Level of Significance After Mitigation
Riverview Marketplace Commercial Project
Environmental Impact Report 4.8 Greenhouse Gas Emissions City of Bakersfield – SCH No. 2025101507 4.8-22
Impact significant and unavoidable.

Threshold GHG-2: Would the project conflict with an applicable plan, policy or regulation adopted for the purpose of reducing the emissions of greenhouse gases?
Impact Analysis
Applicable plans adopted for the purpose of reducing GHG emissions include CARB’s Scoping Plan and Kern COG’s RTP/SCS. A consistency analysis with these plans is presented below.

CARB Scoping Plan
The CARB Scoping Plan is applicable to state agencies but is not directly applicable to cities/counties and individual projects (i.e., the Scoping Plan does not require the City to adopt policies, programs, or regulations to reduce GHG emissions). However, new regulations adopted by the state agencies outlined in the Scoping Plan result in GHG emissions reductions at the local level. As a result, local jurisdictions benefit from reductions in transportation emissions rates, increases in water efficiency in the building and landscape codes, and other statewide actions that affect a local jurisdiction’s emissions inventory from the top down. Statewide strategies to reduce GHG emissions include the LCFS and changes in the corporate average fuel economy standards (e.g., Pavley I and Pavley California Advanced Clean Cars program).

The Project would adhere to the programs and regulations identified by the Scoping Plan and implemented by state, regional, and local agencies to achieve the statewide GHG reduction goals of AB 32 and SB 32. For example, new buildings under the proposed project would be required to, at minimum, meet the current CALGreen and Building Energy Efficiency Standards. The Project would install on-site PV systems to generate renewable electricity (anticipated 1,201,933 kWh/yr), which would be in compliance with the PV requirements under Section 140.10 of the Building Energy Efficiency Standards. Additionally, the Project would include electric vehicle (EV) parking in compliance with the CALGreen EV parking requirements. Installation of the proposed PV systems and EV parking spaces would contribute to achieving the building decarbonization and transportation electrification strategies of the Scoping Plan. Overall, development of the Project would not obstruct implementation nor be inconsistent with the CARB Scoping Plan.

Kern COG’s Regional Transportation Plan/Sustainable Communities Strategy The Kern COG 2022 RTP/SCS transportation projects help more efficiently distribute population, housing, and employment growth, and forecast development is generally consistent with regional-level general plan data to promote active transportation and reduce GHG emissions. The projected regional development, when integrated with the proposed regional transportation network in the 2022 RTP/SCS, would reduce per-capita GHG emissions related to vehicular travel and achieve the GHG reduction per capita targets for the Kern COG region. The 2022 RTP/SCS does not require that local general plans, specific plans, or zoning be consistent with the SCS, but provides incentives for consistency to governments and developers.

The Project would result in the development of a shopping center that would provide retail and commercial uses within the interior area of the City. A VMT analysis was prepared in accordance with Senate Bill 743 to evaluate potential VMT impacts of the project. Per the analysis, the Project would result in an overall net increase in countywide roadway VMT under both existing and cumulative conditions. Additionally, the proposed medical office use would exceed the applicable VMT per employee threshold. Therefore, the Project would not fully support the overall goal of Riverview Marketplace Commercial Project
Environmental Impact Report 4.8 Greenhouse Gas Emissions City of Bakersfield – SCH No. 2025101507 4.8-23
the Kern COG 2022 RTP/SCS in reducing per capita GHG emissions related to passenger vehicle travel. Impacts would be significant.

Mitigation Measures
MM GHG-5 and MM GHG-6.

Level of Significance After Mitigation
Impact significant and unavoidable.

Per the VMT analysis prepared, the Project has been designed to incorporate feasible VMT reducing strategies. The Project would include end-of-trip bicycle facilities such as bicycle parking and lockers. In addition, it also includes bicycle facility improvements as it proposes a new bicycle lane along Rosedale Highway, which would extend an existing facility and improve overall bicycle network connectivity. Furthermore, the Project includes pedestrian network improvements such as new sidewalks along its frontages, which would improve pedestrian connectivity and walkability (GTS 2025). Aside from these Project-related design features, future commercial tenants of the proposed Project would be subject to the SJVAPCD Rule 9410 eTRIP rule. These Project improvements in addition to the SJVPACD eTRIP rule would contribute to reducing Project-generated VMT to the extent feasible.

Incorporation of MM GHG-5 and GHG-6, which would result in improvements for up to two bus stops and installation of an onsite end-of-trip shower facility, would also contribute to reducing project-generated VMT to the extent feasible by supporting public transit and bicycle use.

However, overall, the proposed Project would continue to be inconsistent with the Kern COG 2022 RTP/SCS.

Cumulative Impacts
Project-related GHG emissions are not confined to a particular air basin, but are dispersed worldwide. Therefore, impacts identified under Impact GHG-1 are not project-specific impacts to global warming, but the Project’s contribution to this cumulative impact. As stated, implementation of MM GHG-1 through GHG-7 would contribute to minimizing project-related energy sector and mobile source GHG emissions to the extent feasible. However, the Project would still result in a net increase in GHG emissions. Thus, the Project’s GHG emissions and contribution to global climate change impacts are considered cumulatively considerable.

Mitigation Measures
MM GHG-1 through GHG-7
Level of Significance After Mitigation
Impact significant and unavoidable.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.8 Greenhouse Gas Emissions City of Bakersfield – SCH No. 2025101507 4.8-24
This page intentionally left blank.

City of Bakersfield – SCH No. 2025101507 4.9-1

4.9 Hazards and Hazardous Materials
This Section discusses any potential environmental impacts associated with hazards and hazardous materials (other than geologic and flood hazards) associated with implementation of the proposed Riverview Marketplace Commercial Project (Project). Potential effects are evaluated based on the Project’s potential to create significant hazards through the use, transport, or handling of hazardous materials; upset or accident conditions; emit hazardous materials near schools; be located on a hazardous site; safety and noise conditions near an airport; impair an emergency response plan; or increase exposure to wildfire. This section evaluates potential impacts related to hazards and hazardous materials and identifies measures to reduce or avoid significant impacts.

The analysis in this Section is based on a review of the relevant regulatory setting, existing conditions, and a discussion of the thresholds used to determine whether the Project would result in significant impacts associated with hazards and hazardous materials. Information in this Section is based, in part, on the Metropolitan Bakersfield General Plan (General Plan); the City of Bakersfield (City) Municipal Code (BMC) Title 17 (Zoning Ordinance); a Phase I Environmental Site Assessment (Phase I ESA) prepared for the Project by Rincon Consultants (Rincon), dated August 21, 2025; a Soil Vapor Sampling Report (Soil Vapor Report) prepared for the Project by Rincon, dated November 2024 (See Appendix F-1, Phase I ESA); and an Engineering Review of Plugged & Abandoned Oil & Gas Wellbores “REID-KCL” #1 and #3 (Well Engineering Report), prepared by Petrotech Resources Company, Inc. (Petrotech), dated March 1, 2026 (See Appendix F-2, Engineering Review of Plugged and Abandoned Oil and Gas Wellbores).

These Project-specific reports are included in Appendix F, Hazards and Hazardous Materials Supporting Information, of this Draft Environmental Impact Report (EIR).

During the scoping period for the Project’s EIR, no comments were received in response to the Notice of Preparation (NOP) regarding hazardous and hazardous materials.

4.9.1 Regulatory Setting
Federal
Clean Water Act
The Clean Water Act (CWA) (33 U.S.C. Section 1251 et seq.) was enacted with the intent of restoring and maintaining the chemical, physical, and biological integrity of the waters of the United States. The CWA requires states to set standards to protect, maintain, and restore water quality through the regulation of point source and certain non‐point source discharges to surface water. Those discharges are regulated by the National Pollutant Discharge Elimination System (NPDES) permit process (CWA Section 402). In California, NPDES permitting authority is delegated to, and administered by, the nine Regional Water Quality Control Boards (RWQCBs).

The Project is within the jurisdiction of the Central Valley RWQCB.

Section 402 of the Clean Water Act authorizes the California State Water Resources Control Board (SWRCB) to issue NPDES General Construction Storm Water Permit (Water Quality Order 99‐08‐DWQ), referred to as the “General Construction Permit.” Construction activities can comply with and be covered under the General Construction Permit provided that they:

Riverview Marketplace Commercial Project
Environmental Impact Report 4.9 Hazards and Hazardous Materials City of Bakersfield – SCH No. 2025101507 4.9-2
• Develop and implement a Storm Water Pollution Prevention Plan (SWPPP) which specifies Best Management Practices (BMPs) that will prevent all construction pollutants from contacting stormwater and with the intent of keeping all products of erosion from moving off‐site into receiving waters;
• Eliminate or reduce non‐stormwater discharges to storm sewer systems and other waters of the nation; and
• Perform inspections of all BMPs.

NPDES regulations are administered by the RWQCB. Projects that disturb one or more acres are required to obtain NPDES coverage under the Construction General Permits.

Comprehensive Environmental Response, Compensation, and Liability Act The Comprehensive Environmental Response, Compensation, and Liability Act, as amended (CERCLA)(42 United States Code [U.S.C.] Section 9601 et seq.), commonly known as the “Superfund,” provides federal funding to identify and remediate hazardous materials sites.

CERCLA establishes requirements concerning closed and abandoned hazardous materials sites; provides for liability of persons responsible for releases of hazardous materials at these sites; and establishes a trust fund to provide for cleanup when no responsible party can be identified.

CERCLA also enabled revision of the National Contingency Plan (NCP). The NCP (40 Code of Federal Regulations [CFR] Part 300) established the National Priorities List (NPL), identifying hazardous materials cleanup sites around the country and provides the guidelines and procedures needed to respond to releases and threatened releases of hazardous materials.

The Superfund process includes conducting a preliminary site assessment/inspection, listing on the NPL, preparation of a remedial investigation/feasibility study (RI/FS), and filing a record of decision identifying the cleanup method, remedial design, and remedial action. The NPL is a list of the worst hazardous waste sites that have been identified by Superfund.

The Superfund Amendments and Reauthorization Act (SARA) reauthorized and amended CERCLA to provide clarification on the law, establish new means of enforcement, and increase State and citizen involvement in the Superfund program. SARA increased the Superfund trust fund to $8.5 billion.1
Emergency Planning and Community Right-to-Know Act
The federal Emergency Planning and Community Right-To-Know Act (EPCRA) was enacted to inform communities and residents of chemical hazards in their area. Businesses are required to report the locations and quantities of chemicals stored on-site to both State and local agencies.

EPCRA requires the U.S. EPA to maintain and publish a digital database list of toxic chemical releases and other waste management activities reported by certain industry groups and federal facilities. This database, known as the Toxic Release Inventory, gives the community more power to hold companies accountable for their chemical management.

Hazardous Materials Transportation Act
The Hazardous Materials Transportation Act of 1975 (HMTA)(49 U.S.C. Sections 5101–5127) authorizes the U.S. Department of Transportation (U.S. DOT) to regulate the transportation of hazardous materials in the United States. The U.S. DOT is the primary regulatory authority for 1 United States Environmental Protection Agency. 2025. The Superfund Amendments and Reauthorization Act (SARA) webpage.

Available at: https://www.epa.gov/superfund/superfund-amendments-and-reauthorization-act-sara. Accessed April 2026.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.9 Hazards and Hazardous Materials City of Bakersfield – SCH No. 2025101507 4.9-3
the interstate transport of hazardous materials and establishes regulations for safe handling procedures (i.e., packaging, marking, labeling, and routing).

Hazardous Materials Transportation Uniform Safety Act
The transportation of hazardous materials is regulated at the federal level under HMTA, as amended by the Hazardous Materials Transportation Uniform Safety Act of 1990 (HMTUSA).

HMTUSA was enacted to improve the safe transportation of hazardous materials in intrastate, interstate, and foreign commerce and to promote nationwide uniformity among hazardous materials transportation regulations. Under HMTUSA, the U.S. Secretary of Transportation is authorized to designate hazardous materials, promulgate and enforce regulations governing their transportation, and establish requirements related to packaging, labeling, handling, routing, and permitting. The HMTUSA also clarifies the extent to which federal hazardous materials transportation regulations preempt inconsistent state and local requirements, while allowing states and Indian tribes to designate highway routes and impose restrictions for hazardous materials transportation when such actions are consistent with federal standards. Compliance with regulations adopted pursuant to HMTUSA is intended to minimize risks to public health, safety, property, and the environment associated with the transportation of hazardous materials.

Occupational Safety and Health Act
Congress passed the Occupational and Safety Health Act of 1970 (OSH Act)(29 U.S.C. Section 651 et seq.) to ensure worker and workplace safety. The OSH Act was intended to ensure that employers provide places of employment free from recognized hazards to safety and health. The OSH Act established the National Institute for Occupational Safety and Health (NIOSH) as the research institution for the Occupational Safety and Health Administration (OSHA), a division of the U.S. Department of Labor that oversees the administration of the OSH Act. OSHA’s Hazardous Waste Operations and Emergency Response Standards apply to five groups of employers and their employees. This includes any employees who are exposed or potentially exposed to hazardous substances (including hazardous waste) and who are engaged in clean-up operations; corrective actions; voluntary clean-up operations; operations involving hazardous wastes at treatment, storage, and disposal facilities; and emergency response operations.

Resource Conservation and Recovery Act/Hazardous and Solid Waste Act Resource Conservation and Recovery Act (RCRA)(42 U.S.C. Section 6901 et seq.) authorized the U.S. EPA to enact a “cradle to grave” system of regulating hazardous wastes. This includes enabling, reporting, and record keeping requirements for the generation, transportation, treatment, storage, and disposal of hazardous wastes.

Toxic Substances Control Act
The Toxic Substances Control Act of 1976 (TSCA)(15 U.S.C. Sections 2601–2629) charged the United State Environmental Protect Agency (U.S. EPA) with the authority to regulate testing, record keeping, and reporting requirements for certain chemical substances. Specific substances, including polychlorinated biphenyls (PCBs), asbestos, lead-based paint, and radon were specifically addressed by the TSCA.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.9 Hazards and Hazardous Materials City of Bakersfield – SCH No. 2025101507 4.9-4
State
Assembly Bill 30 (2022)
Assembly Bill (AB) 30 established statewide requirements to reduce emissions of volatile organic compounds (VOCs) associated with gasoline storage and dispensing by requiring the use of certified vapor recovery controls at service stations. In general, these requirements are implemented through the California Air Resources Board (CARB) and local air districts and include controls for gasoline vapors displaced during both fuel deliveries to underground storage tanks (often referred to as Phase I or Stage I vapor recovery) and vehicle refueling at the dispenser (often referred to as Phase II or Stage II vapor recovery, where applicable). Compliance with applicable vapor recovery requirements is intended to minimize evaporative emissions of gasoline constituents (including benzene and other VOCs), thereby reducing potential public exposure and contributing to attainment of ambient air quality standards.

California Code of Regulations Title 22
Hazardous waste management and transportation in California are regulated under Title 22 of the California Code of Regulations (CCR), Division 4.5, which establishes environmental health standards for the identification, generation, transportation, treatment, storage, and disposal of hazardous waste. Title 22 is administered by the California Department of Toxic Substances Control (DTSC) and implements the statutory requirements of the California Hazardous Waste Control Law. Of particular relevance to hazardous materials transportation, Chapter 13 of Title 22 sets forth standards applicable to transporters of hazardous waste, including requirements for compliance with the hazardous waste manifest system, recordkeeping, spill response, and discharge reporting. Title 22 regulations also incorporate and are intended to be consistent with applicable federal hazardous materials transportation regulations, including those adopted by the U.S. Department of Transportation. Compliance with Title 22 is intended to ensure the safe handling and transportation of hazardous waste within, into, out of, and through the State of California, thereby minimizing potential risks to public health, safety, and the environment.

California Occupational Safety and Health Administration The California Occupational Safety and Health Administration (Cal/OSHA) is the primary agency responsible for worker safety in the handling and use of chemicals in the workplace. Cal/OSHA standards are generally more stringent than federal regulations. Employers are required to monitor worker exposure to listed hazardous substances and notify workers of exposure (8 CCR Sections 337‐340). The regulations specify requirements for employee training, availability of safety equipment, accident‐prevention programs, and hazardous substance exposure warnings.

In addition, Cal/OSHA regulates medical and/or infectious waste.

CCR Title 8, Industrial Relations, contains the State’s occupational safety and health regulations and related labor rules administered through the California Department of Industrial Relations, including Cal/OSHA requirements, intended to protect workers and the public from workplace hazards. For hazards and hazardous materials, Title 8 establishes standards for injury and illness prevention planning, hazard communication (e.g., chemical identification, labeling, and safety data sheets), employee training, exposure monitoring and control, and the provision and use of appropriate personal protective equipment. Title 8 also includes industry-specific safety orders applicable to construction and general industry activities (e.g., requirements for excavation safety, demolition, confined spaces, and equipment operation), which would apply to Project construction and operational activities as applicable.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.9 Hazards and Hazardous Materials City of Bakersfield – SCH No. 2025101507 4.9-5
Cal/OSHA has established construction-related asbestos standards (8 CCR Section 1529) and industrial-related asbestos standards (8 CCR Section 5208). These standards regulate handling and disposal of asbestos encountered during construction and industrial activity. Construction related asbestos standards apply to exposure associated with construction work such as demolition and excavation. The industrial standards apply to all industrial activity that falls under Cal/OSHA purview. Cal/OSHA has also established standards addressing lead paint encountered during construction (8 CCR Section 1532.1). These standards include exposure assessment, safety requirements, and employee training pertaining to lead exposure and handling.

California Fire Code
The California Fire Code (CFC) is included in the California Building Standards Code (CBC) (24 CCR DTPart 9). The CFC includes provisions and standards for emergency planning and preparedness, fire service features, fire protection systems, hazardous materials, fire flow requirements, fire hydrant locations and distribution.

Department of Toxic Substances Control
DTSC is a department of the California Environmental Protection Agency (CalEPA) with responsibility for implementing and enforcing California’s own hazardous waste laws (known collectively as the Hazardous Waste Control Law). Although similar to RCRA, the California Hazardous Waste Control Law and its associated regulations define hazardous waste more broadly and regulate a larger number of chemicals. Hazardous wastes regulated by California but not by the U.S. EPA are called “non-RCRA hazardous wastes.” Other laws that affect hazardous waste are specific to handling, storage, transportation, disposal, treatment, reduction, cleanup, and emergency planning.

The Hazardous Waste and Sites List (Cortese List) (Government Code [Gov. Code] Section 65962.5) includes DTSC-listed hazardous waste facilities and sites, Department of Health Services lists of contaminated drinking water wells, sites listed by the SWRCB as having underground storage tank leaks and have had a discharge of hazardous wastes or materials into the water or groundwater, and lists from local regulatory agencies of sites that have had a known migration of hazardous waste/material.

Hazardous Materials Release Response Plans and Inventory Act of 1985 The Hazardous Materials Release Response Plans and Inventory Act (Business Plan Act)(Health and Saf. Code [HSC], Div. 20, Ch. 6.95), requires businesses using hazardous materials to prepare a plan that describes their facilities, hazardous materials inventories, emergency response plans, and training programs. Businesses must submit this information to their respective County Department of Environmental Health (DEH). The DEH verifies the information and provides it to agencies responsible for protection of public health and safety and the environment. Business Plans are required to include emergency response plans and procedures in the event of a reportable release or threatened release of a hazardous material. These plans must include, but are not limited to:
• Protocols for immediate notification to the administering agency and to the appropriate local emergency rescue personnel.
• Procedures for the mitigation of a release or threatened release to minimize any potential harm or damage to persons, property, or the environment. • Evacuation plans and procedures, including immediate notice, for the business site.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.9 Hazards and Hazardous Materials City of Bakersfield – SCH No. 2025101507 4.9-6
Business Plans are also required to include training for all new employees, and annual training, including refresher courses, for all employees in safety procedures in the event of a release or threatened release of a hazardous material.

Hazardous Waste Control Act
The Hazardous Waste Control Act of 1972 (HSC Section 25100 et seq.) created the State hazardous waste management program, which is similar to, but more stringent than, the federal RCRA program. The act is implemented by regulations contained in Title 26 of the CCR, which describes the following required aspects for the proper management of hazardous waste:
identification and classification; generation and transportation; design and permitting of recycling, treatment, storage, and disposal facilities; treatment standards; operation of facilities and staff training; and closure of facilities and liability requirements. These regulations list more than 800 materials that may be hazardous and establish criteria for identifying, packaging, and disposing of such waste. Under the Hazardous Waste Control Act and Title 26, the generator of hazardous waste must complete a manifest that accompanies the waste from generator to transporter to the ultimate disposal location. Copies of the manifest must be filed with the DTSC.

Public Resources Code 3208.1
Public Resources Code (PRC) Section 3208.1 authorizes the California Geologic Energy Management Division (CalGEM) or a district deputy to order or permit the re-abandonment of a previously abandoned oil or gas well when there is reason to question the integrity of the prior abandonment, or when the well is not accessible or visible, to prevent damage to life, health, and property. The statute also establishes responsibility for re-abandonment costs. Generally, the operator responsible for plugging and abandoning “deserted” wells under PRC Section 3237 remains responsible; however, in limited circumstances the property owner, developer, or other party causing construction over or near the well, or a party that later disturbs the abandonment integrity, may be required to obtain necessary rights and perform or fund the re-abandonment.

These provisions are intended to ensure previously abandoned wells remain protective and accessible for future monitoring or remedial work, particularly where site redevelopment is proposed.

Unified Hazardous Waste and Hazardous Materials Management Regulatory Program The Unified Hazardous Waste and Hazardous Materials Management Regulatory Program (Unified Program) required the administrative consolidation of six hazardous materials and waste programs (Program Elements) under one agency, a Certified Unified Program Agency (CUPA).

The CUPA designated for the City is the Bakersfield Fire Department (BFD), which consists of 14 fire stations and 300 firefighters. Within the BFD, the CUPA program is part of the Fire Prevention Division and has seven inspectors and one supervisor. They currently regulate about 1,600 facilities and implement all six CUPA Program Elements for the City. BFD combines the annual fire safety inspection with the appropriate CUPA elements. The information put into the California Environmental Reporting System (CERS) is available to first responders and provides facility maps, chemical inventories and contact information, all critical information for responders.2 The Unified Program is intended to provide relief to businesses complying with the overlapping and sometimes conflicting requirements of formerly independently managed programs. The Unified Program is implemented at the local government level by CUPAs. Most CUPAs have been 2 California CUPA Forum. 2026. CUPA Profiles. Bakersfield City Fire Department. Available at: https://calcupa.org/cupa-profiles/index.html#:~:text=The%20CUPA%20program%20here%20is,program%20elements%20for%20the%20city. Accessed April 2026.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.9 Hazards and Hazardous Materials City of Bakersfield – SCH No. 2025101507 4.9-7
established as a function of a local environmental health or fire department. Some CUPAs have contractual agreements with another local agency, a participating agency, which implements one or more Program Elements in coordination with the CUPA.

The Program Elements consolidated under the Unified Program are Hazardous Waste Generator and On‐site Hazardous Waste Treatment Programs (“Tiered Permitting”); Aboveground Petroleum Storage Tank Spill Prevention, Control, and Countermeasure (SPCC) plans; Hazardous Materials Release Response Plans and Inventory Program (Hazardous Materials Disclosure or “Community‐Right‐To‐Know”); California Accidental Release Prevention Program (Cal ARP); Underground Storage Tank (UST) Program; and Uniform Fire Code Plans and Inventory Requirements.

Local
Metropolitan Bakersfield General Plan
The General Plan, dated December 2002, was updated in January 2016 per Resolution No. 018- 16, 019-16. At the time this EIR was published for public review, the City was in the process of updating its General Plan, but it had not yet been adopted. The General Plan includes goals, policies, and directions to achieve the City’s vision of the community and future development. The General Plan includes 12 elements that focus on: Land Use; Circulation; Housing; Conservation; Noise; Safety; Downtown Redevelopment; Open Space; Public Services Facilities; Parks; Kern River Plan; and Historical Resources.

The General Plan established the following goals and policies regarding hazards and hazardous materials.

Land Use Element
LAND/GEN-G-6 Accommodate new development that is sensitive to the natural environment, and accounts for environmental hazards.

Safety Element
SAFE/GEN-G-1 To develop sustainable communities to preserve life, protect property, the environment, and the economy from natural hazards.

SAFE/GEN-P-1 The adopted Kern County, California Multi-Hazard Mitigation Plan is incorporated by reference. This multi-jurisdictional plan, approved in compliance with the Disaster Mitigation Act of 2000, provides long-term planning to reduce the impacts of future disasters.

SAFE/PUB-G-4 Assure that fire, hazardous substance regulation and emergency medical service problems are continuously identified and addressed in a proactive way, in order to optimize safety and efficiency.

SAFE/PUB-G-7 Protect land uses from the risk of dam failure inundation including the assurances that: the functional capabilities of essential facilities are available in the event of a flood; hazardous materials3 are not released; effective measures for mitigation of dam failure inundation are incorporated into the design of critical facilities; and the rapid and orderly evacuation of populations in the inundation area will occur.
3 Hazardous materials are defined as injurious substances, including pesticides, herbicides, toxic metals and chemicals, liquified natural gas, explosives, volatile chemicals, and nuclear fuels.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.9 Hazards and Hazardous Materials City of Bakersfield – SCH No. 2025101507 4.9-8
SAFE/PUB-P-4 Monitor, enforce and update as appropriate all emergency plans as needs and conditions in the planning area change, including the California Earthquake Response Plan, the Kern County Evacuation Plan, and the City of Bakersfield Disaster Plan
SAFE/PUB-P-7 Enforce ordinances regulating the use/manufacture/sale/transport/ disposal of hazardous substances and require compliance with state and federal laws regulating such substances
SAFE/PUB-P-8. The Kern County and Incorporated Cities Hazardous Waste Management Plan and Final Environmental Impact Report serve as the policy document guiding all facets of hazardous waste
SAFE/PUB-P-18 Design discretionary critical facilities located within the potential inundation area for dam failure in order to: mitigate the effects of inundation on the facility; promote orderly shut-down and evacuation (as appropriate); and prevent on-site hazards from affecting building occupants and the surrounding communities in the event of dam failure
SAFE/PUB-P-19 Design discretionary facilities in the potential dam inundation area used for the manufacture, storage or use of hazardous materials to prevent on-site hazards from affecting surrounding communities in the event of inundation SAFE/PUB-P-24 Require the city's and county's emergency preparedness programs to have a three-fold emphasis: hazard mitigation, disaster response and self-sufficiency of residents, business and industry Kern County Multi-Jurisdictional Hazard Mitigation Plan The Kern Multi-Jurisdictional Hazard Mitigation Plan (MJHMP) was approved by FEMA on April 9, 2021. This Kern MJHMP provides an explanation of prevalent hazards within the County and how hazards may affect the County and participating cities and special districts differently based upon proximities to natural hazards. It also identifies risks to vulnerable assets, both people and property. The mitigation strategy presented in the Kern MJHMP responds to the identified vulnerabilities within each community and provides prescriptions or actions to achieve the greatest risk reduction based upon available resources. The County and participating jurisdictions intend to save lives, reduce injuries, reduce property damage, and protect natural resources for future generations through mitigation activities.4 The City has its own participating jurisdiction annex report that contained individually assessed hazards, explored hazard vulnerability, developed mitigation strategies, and followed the same planning process as County to create the annexes.

Kern County and Incorporated Cities Hazardous Waste Management Plan The Kern County Operational Area Hazardous Materials Area Plan addresses the use, storage, and transportation of hazardous materials and the generation and transportation of hazardous wastes in the Kern County Operational Area. At the time of a significant emergency, the Kern County Operational Area serves as the coordination and communication link between the cities and special districts within the County’s boundaries. Serving as the lead agency in the Kern County Operational Area is the County of Kern, while oversight and administrative support is provided by the Kern County Office of Emergency Services. During incidents involving the release 4 County of Kern. 2021. Kern Multi-Jurisdictional 2020 MJHMP Update. Available at:
https://psbweb.kerncounty.com/planning/pdfs/MJHMP/Volumes/Volume1.pdf. Accessed March 2026.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.9 Hazards and Hazardous Materials City of Bakersfield – SCH No. 2025101507 4.9-9
or threatened release of hazardous substances, the Hazardous Materials Area Plan identifies local, State, and federal responsibilities.

4.9.2 Environmental Setting
The following sections describe the environmental setting based on a Phase I ESA prepared by Rincon and dated August 21, 2025; a Soil Vapor Report prepared by Rincon and dated November 2024; and a Well Engineering Report prepared by Petrotech and dated March 1, 2026. These Project-specific reports are included in Appendix F, Hazards and Hazardous Materials Supporting Information, of this Draft EIR.

Existing Conditions
The Project Site is largely vacant and is located south of Rosedale Highway, west of Coffee Road, and east of El Toro Viejo Road. The Project Site is located in an area that is primarily composed of residential, commercial, and industrial land uses. Adjacent properties include commercial shopping centers with retail stores and restaurants, a furniture store, a PG&E transmission station, and vacant land. The Project Site is situated at an elevation of approximately 390 feet above mean sea level with topography sloping gently down to the west. The adjacent topography consists of relatively flat land. Multiple power poles and transmission lines are located on the Project Site. No other structures, roads, or other improvements are located on the Project Site. A chain-link fence was noted around the perimeter of the Project Site.

Table 4.9-1, Current Adjacent Land Uses, lists the land uses surrounding the Project Site.

Table 4.9-1 Current Adjacent Land Uses
Direction Relative
to Project Site Description
Northern
Rosedale Highway followed by a commercial shopping center with retail stores and restaurants
Northeastern Intersection of Rosedale Highway and Coffee Road followed by a tire shop Eastern Coffee Road followed by a canal, a commercial shopping center with a restaurant and retail stores, and vacant land to the southeast
Southern PG&E transmission station
Western Restaurant, vacant land, and El Toro Viejo Road followed by a furniture store Source: Rincon, Phase I ESA, 2025.

The Project Site is located within the Fruitvale oil/gas field and four newly “plugged” oil and gas production wells, two previously “plugged” oil and gas production wells, one “plugged” waterflood well, and three “abandoned/removed” tanks are mapped as located on the Project Site.

No natural gas transmission pipelines or hazardous liquid pipelines are located on the Project Site or adjacent properties. Additionally, no pipeline-related accidents or incidents are mapped within 0.25 mile of the Project Site.

Perfluorooctane sulfonic acid (PFOS) was detected in a City drinking water well located approximately 2,800 feet east of the Project Site and tested quarterly as part of a PFAS investigative order. This well contains PFOS at a concentration less than its State Water Resources Control Board (SWRCB) notification level. Perfluorooctanoic acid (PFOA) was not detected above the laboratory reporting limit in this drinking water well.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.9 Hazards and Hazardous Materials City of Bakersfield – SCH No. 2025101507 4.9-10
Historical Uses
The Phase I ESA includes a historical records review completed for the Project Site and is included in Table 4.9-2, Historical Land Uses, below.

Table 4.9-2 Historical Land Uses
Land Use Earliest
Use Date Description
Undeveloped 1906 Undeveloped land
Vacant/
Industrial
1952 Vacant land in the northern/northwestern portion, several aboveground storage tanks (ASTs) and a portion of a power plant with industrial structures in the southeastern portion, power transmission lines traversing the central portion in a north-south direction
Industrial 1961 Similar to previous, with additional smaller ASTs in the northeastern portion and disturbed areas/bermed areas west of a power plant (site drainage controls) and smaller structures (oil wells) in the northern/northwestern portion Industrial 2012 Some power plant structures in the southeastern portion have been removed; larger ASTs removed by 2014
Industrial 2016 The remainder of the power plant structures in the southeastern portion have been removed; covered stockpiles in the southeastern portion Vacant 2018 Vacant land with power transmission lines, smaller ASTs in the northeastern portion and covered stockpiles in the southeastern portion have been removed Source: Rincon, Phase I ESA, 2025.

PG&E Kern Power Plant
The southern portion of the Project Site was previously developed with the PG&E Kern Power Plant (2401 Coffee Road), which formerly included two natural gas- and oil-burning power generation facilities, petroleum ASTs, and cooling towers. The former PG&E Kern Power Plant was demolished in 2013 and is associated with a closed Cleanup Program case as of 2019, which included soil remediation and groundwater monitoring under the oversight of the Central Valley Regional Water Quality Control Board (CVRWQCB).

A Land Use Covenant (LUC) was recorded for the former power plant site (including the Project Site) and required the preparation of a Soil Management Plan (SMP), which was prepared for the Project area and approved by the CVRWQCB. Based on the soil remediation conducted and residual concentrations of Contaminant of Concern (COCs) in soil and soil vapor at the Project Site below commercial/industrial Water Quality Control Board Environmental Screening Levels (ESLs), the former onsite/southern adjacent power plant is considered a controlled recognized environmental condition (CREC). As concluded in the Phase I ESA, no additional assessment is recommended at the Project Site.

Oil Wells
Four newly “plugged” oil and gas production wells, two previously “plugged” oil and gas production wells, one “plugged” waterflood well, and three “abandoned/removed tanks” are mapped as located on the Project Site. According to the Phase I ESA, the oil wells were plugged and abandoned to current CalGEM standards. As noted in the Well Engineering Report, the original plugging and abandonment of the two wells was approved by CalGEM’s predecessor at the time as adequately meeting the requirement for protecting all subsurface strata, ground water, and the surface.

Confirmation samples were collected and analyzed for Total petroleum hydrocarbons as gasoline (TPH-g), Total petroleum hydrocarbons as diesel (TPH-d), and Total petroleum hydrocarbons as Riverview Marketplace Commercial Project
Environmental Impact Report 4.9 Hazards and Hazardous Materials City of Bakersfield – SCH No. 2025101507 4.9-11
motor oil (TPH-o) to confirm that soil remaining onsite did not contain TPH-g, TPH-d, or TPH-o at concentrations in exceedance of commercial/industrial Water Quality Control Board ESLs.

As identified above, a Soil Vapor Report was prepared for the Project Site by Rincon to describe soil vapor sampling activities conducted to evaluate the potential for soil vapor impacts to future commercial site occupants given this historical use of the site and the fact that a portion of the site is located on an oil field. Soil vapor probes were installed on October 21 through 24, 2024 in 31 locations across the site to evaluate every building pad location in the proposed development.

Each soil vapor probe was sampled using a mobile laboratory on October 28 through 30, 2024 and analyzed for VOCs. Neither VOCs nor methane were detected above the laboratory reporting limits in any soil vapor samples collected from the soil vapor probes located in the Project’s proposed building pads or the proposed parking and electric vehicle charging areas on the Project Site during the soil vapor assessment. The Phase I ESA concluded that no additional assessment is recommended as a result of its investigation of the Project Site. The Phase I ESA indicated it has not found evidence that hazardous materials or petroleum products exist at the Project Site at levels that would require mitigation.

Adjacent Oli Refinery
The eastern adjacent property at 2152 Coffee Road previously operated as an oil refinery (Sunland Refining/ World Oil Corp.) and is associated with four open Cleanup Program Site cases, with TPH, VOC, and PFAS impacts to soil, soil vapor, and/or groundwater. Based on the distance to the remaining soil, soil vapor, and groundwater impacts (approximately 980 feet away), this site is considered a de minimis condition with respect to the Project Site. A de minimis condition is defined pursuant to ASTM E1527-21 as, “a condition related to a release that generally does not present a threat to human health or the environment and that generally would not be the subject of an enforcement action if brought to the attention of appropriate governmental agencies. A condition determined to be a de minimis condition is not a recognized environmental condition nor a controlled recognized environmental condition.”

4.9.3 Impact Analysis
Methodology
Potential direct and indirect impacts were identified in part based on a review of the Phase I ESA, Soil Vapor Report, and Well Engineering Report included as Appendix F, as well as other documentation, including the City’s General Plan and Zoning Ordinance and the Kern County and Incorporated Cities Hazardous Waste Management Plan.

Thresholds of Significance
The City utilizes the California Environmental Quality Act (CEQA) Guidelines, Appendix G, and thresholds of significance5to analyze the environmental impacts of the Project. Per CEQA Guidelines, an impact is considered significant if the Project would:
• Create a significant hazard to the public or the environment through the routine transport, use, or disposal of hazardous materials;
5 Association of Environmental Professionals (AEP). 2025. CEQA Guidelines Appendices, Appendix G: Environmental Checklist Form. Available at: https://www.califaep.org/docs/CEQA_Handbook_2025combined.pdf. Accessed January 2026.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.9 Hazards and Hazardous Materials City of Bakersfield – SCH No. 2025101507 4.9-12
• Create a significant hazard to the public or the environment through reasonably foreseeable upset and accident conditions involving the release of hazardous materials into the environment;
• Emit hazardous emissions or handle hazardous or acutely hazardous materials, substances, or waste within one-quarter mile of an existing or proposed school; • Be located on a site which is included on a list of hazardous materials sites compiled pursuant to Government Code § 65962.5 and, as a result, would create a significant hazard to the public or the environment;
• For a project located within an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, would the project result in a safety hazard or excessive noise for people residing or working in the project area; • Impair implementation of or physically interfere within an adopted emergency response plan or emergency evacuation plan;
• Expose people or structures, either directly or indirectly, to a significant risk of loss, injury or death involving wildfires.

Project Impacts
Threshold HAZ-1: Would the project create a significant hazard to the public or the environment through the routine transport, use, or disposal of hazardous materials?
Impact Analysis
Construction
During construction of the proposed Project, heavy equipment (e.g., dozers, excavators, tractors) would be operated on the Project Site. This heavy equipment likely would be fueled and maintained by petroleum-based substances such as diesel fuel, gasoline, oil, and hydraulic fluid, which are considered hazardous if improperly stored or handled. In addition, materials such as paints, adhesives, solvents, and other substances typically used in building construction would be located on the Project Site during construction.

As such, construction of the Project would involve the transport and use of hazardous materials in the Project area. However, continued compliances with laws, regulations, and policies governing the use of these materials would ensure that Project implementation would not serve to increase public or environmental exposure to hazardous materials. These regulations are detailed above in the regulatory section. In addition, the City’s development review process ensures that land use compatibility as it relates to hazards is examined and enforced in the entitlement process. Further, any future development that would occur under the Project would be subject to environmental analysis by City staff. Therefore, impacts would be less than significant.

Operation
The Project would construct various commercial buildings including a gas station and car wash.

No residential uses are proposed. It is anticipated that the majority of Project operations would involve employing common maintenance and janitorial supplies, such as cleaners and solvents, paints and thinners for site maintenance, and other common chemicals. The limited quantities Riverview Marketplace Commercial Project
Environmental Impact Report 4.9 Hazards and Hazardous Materials City of Bakersfield – SCH No. 2025101507 4.9-13
and nature of chemicals used by the Project for the generally commercial uses would not be considered significant.

However, the proposed gas station and car wash would utilize hazardous materials regularly during operations. Gas station operations include the use of gasoline and diesel fuel, which are stored in underground storage tanks (USTs). During refueling, VOCs can be releases as vapors, including benzene, toluene, ethyl-benzene, xylenes, and naphthalene. Often, fuel additives are also utilized at gas stations. Additionally, carbon monoxide and formaldehyde are produced by vehicles at the station. Propane tanks (exchange cages), motor oil, lubricants, battery fluids, and hydraulic fluids can also be released due to the nature of regular uses by automobiles.

However, gas stations are heavily regulated by hazardous materials laws focusing on leak prevention, vapor recovery, and fire safety, overseen primarily by the CUPA, which for this Project, is BFD. Specifically, under HSC Section 25500, businesses must submit inventories of hazardous materials (gasoline, diesel), referred to in the Hazardous Material’s Business Plans (HMBP), to the local CUPA agencies to ensure emergency preparedness. Therefore, the HMBP required for the gas station would be reviewed by BFD. Fueling practices are regulated by Title 8 CCR Section 1594, which prohibits fueling while the engine is running and requires controls for spills. Similarly dispensing units are regulated by Title 8 CCR Section 5573, which requires that dispensers have safe, listed equipment with nozzle-activated controls. Additionally, CARB mandates systems to control gasoline vapors during both tanker deliveries (Phase I) and consumer fueling (Phase II) to protect air quality.

Commercial car washes often result in the discharge of oil, grease, copper, lead, nickel, and zinc in the wastewater. As such, operations of the car wash would be required to comply with hazardous material regulations under federal, state, and local laws, focusing on water protection, chemical handling, and waste disposal. Specifically, the CWA requires that car washes treat or properly dispose of water containing detergents, degreasers, oils, and metal and prohibits discharges into storm drains. Similarly, the Project would be required to comply with the RCRA, which mandates "cradle-to-grave" control over hazardous waste, including oil, sludge, and certain soaps. Additionally, the OHSA Hazard Communication Standard (29 CFR Section1910.1200) requires proper labelling, handling procedures, and worker training for handling chemicals. And finally, operations of the car wash would be required to comply with CCR Title 22, which requires secondary containment for chemicals and specific disposal protocols for car wash sludge.

Moreover, the use of these materials would be in accordance with the manufacturers’ specifications for use, storage, and disposal of such products which have been formulated to avoid substantial exposure hazards. Compliance with applicable federal, state, and local requirements concerning the handling, storage and disposal of hazardous waste would reduce the potential to release contaminants. Therefore, impacts related to the routine transport, use, and disposal of hazardous materials would be less than significant.

Mitigation Measures
None required.

Level of Significance After Mitigation
Less than significant with no mitigation required.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.9 Hazards and Hazardous Materials City of Bakersfield – SCH No. 2025101507 4.9-14
Threshold HAZ-2: Would the project create a significant hazard to the public or the environment through reasonably foreseeable upset and accident conditions involving the release of hazardous materials into the environment?
Impact Analysis
Construction
As discussed under Section 4.9.2, Environmental Setting, above, the Phase I ESA determined that there is one CREC in connection with the Project Site, and no additional assessment is recommended at the Project Site. The PG&E Kern Power Plant was formerly present in the southern portion of the Project Site, which was demolished, assessed, and remediated under the oversight of the CVRWQCB. The case was closed on June 3, 2019, with a recorded Land Use Covenant. Additionally, the Project Site had oil wells, which have been plugged and abandoned under CalGEM oversight. Additionally, as identified in the Soil Vapor Report, given the site-wide lack of detections and prior site closure, no further assessment is recommended for soil vapor at the Project Site. As such, no hazards currently exist on the Project Site that could affect construction.

All construction activities would comply with laws, regulations, and policies governing the use of hazardous materials, ensuring that Project implementation would not serve to increase public or environmental exposure to hazardous materials and preventing impacts related to accident or upset conditions. In addition, the City’s development review process ensures that land use compatibility as it relates to hazards is examined and enforced in the entitlement process.

Additionally, BFD, the CUPA for the Project, would also review project plans for consistency with these regulations.

Operation
Project operations would likely involve typical hazardous materials/chemicals such as cleaners, paints, solvents, and fertilizers and pesticides for site landscaping for most of the commercial uses and regular use of hazardous materials during operation of the gas station and car wash.

As previously discussed under Impact HAZ-1, any routine transport, use, and disposal of these materials during Project operations would adhere to federal, State, and local regulations for transport, handling, storage, and disposal of hazardous substances. The car wash and gas station would be required to adhere to regulations specifically designed to contain spills and accidental release, prepare a HMBP, reviewed by BFD as the CUPA, to outline responses to emergencies or accidents. Therefore, with adhere to these mandatory requirements, the Project would not pose a significant threat related to the release of hazardous materials into the environment. Impacts would be less than significant.

Mitigation Measures
None required.

Level of Significance After Mitigation
Less than significant with no mitigation required.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.9 Hazards and Hazardous Materials City of Bakersfield – SCH No. 2025101507 4.9-15
Threshold HAZ-3: Would the project emit hazardous emissions or handle hazardous or acutely hazardous materials, substances, or waste within one-quarter mile of an existing or proposed school?
Impact Analysis
Construction/Operation
The Project Site is located in the Fruitvale School District (FSD), which is located in northwest portion of the City. FSD includes Columbia Elementary, Discovery Elementary, Endeavour Elementary, Quailwood Elementary and Fruitvale Junior High Schools, and has a current TK-grade 8 enrollment of 3,062 students. Specifically, the Project Site is located within the Columbia Elementary School boundary, located at 703 Mondavi Way and approximately 0.89 miles southwest of the Project, and the Fruitvale Junior High School boundary, located at 2114 Calloway Drive and approximately 0.45 miles west of the Project Site.6 The Project Site is also within the school boundaries for Liberty High School, located at 925 Jewetta Avenue and approximately 1.68 miles southwest of the Project Site.7 Liberty High School is part of the Kern High School District (KHSD), which is California’s largest grades 9-12 high school district serving over 42,000 students.8 As such, the Project is not located with 0.25 miles of an existing or proposed school.

Mitigation Measures
None required.

Level of Significance After Mitigation
Less than significant with no mitigation required.

Threshold HAZ-4: Would the project be located on a site which is included on a list of hazardous materials sites compiled pursuant to Government Code § 65962.5 and, as a result, would it create a significant hazard to the public or the environment?
Impact Analysis
The Cortese List is a planning document used by the State, local agencies and developers to comply with the CEQA requirements in providing information about the location of hazardous materials release sites. This list is published by DTSC. As identified in the Phase I ESA, the Project Site is neither currently on the Cortese List currently or historically. However, as discussed in Section 4.9.2, Environmental Setting, the eastern adjacent property at 2152 Coffee Road previously operated as an oil refinery (Sunland Refining/ World Oil Corp.) and is associated with four open Cleanup Program Site cases, with TPH, VOC, and PFAS impacts to soil, soil vapor, and/or groundwater. However, based on the distance to the remaining soil, soil vapor, and groundwater impacts (approximately 980 feet away), this site is considered a de minimis condition with respect to the Project Site. Accordingly, Project construction and operation would not create a significant hazard to the public or the environment. Impacts would be less than significant. 6 Fruitvale Schools District. 2026. District & School Boundaries Map. Available at:
https://1.cdn.edl.io/zvrE010AY3pDw5rMUmBUuq4ANUtkm0KjJ5o56ghSNFTWFiVT.pdf. Accessed February 2026. 7 Kern High School District. 2025. Kern High School District Attendance Boundaries. Available at:
https://4.files.edl.io/9823/08/13/25/162531-7107f99b-35ca-4dc6-8fae-6b121ea94130.pdf. Accessed February 2026. 8 Kern High School District. 2026. About Us webpage. Available at: https://www.kernhigh.org/apps/pages/aboutus. Accessed February 2026.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.9 Hazards and Hazardous Materials City of Bakersfield – SCH No. 2025101507 4.9-16
Mitigation Measures
None required.

Level of Significance After Mitigation
Less than significant with no mitigation required.

Threshold HAZ-5: For a project located within an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, would the project result in a safety hazard or excessive noise for people residing or working in the project area? Impact Analysis
The nearest airport to the Project site is the Meadows Field Airport (BFL), located approximately

3.92 miles to the northeast. The Project site is not located within the he Kern County Airport Land Use Compatibility Plan, Zone C for Meadows Field Airport. As such, the proposed Project is not located within two miles of a public airport, which would result in a safety hazard or excessive noise for people residing or working in the Project area. No impact would occur.

Mitigation Measures
None required.

Level of Significance After Mitigation
No impact with no mitigation required.

Threshold HAZ-6: Would the project impair implementation of or physically interfere within an adopted emergency response plan or emergency
evacuation plan?
Impact Analysis
According to the California Department of Forestry and Fire Protection (CAL FIRE), the Project Site is not within or in proximity to a Very High Fire Hazard Severity Zone (VHFHSZ). The Project Site is located within a Local Responsibility Area and currently receives fire protection services through a Joint Powers Agreement with BFD and Kern County Fire Department. Calls for service from the Project Site would be addressed by KCFD. No aspect of the Project would prevent the implementation of the Kern MJHMP and Emergency Operations Plan. Construction of the proposed Project would be generally confined to the Project Site and would not physically impair access to the Project Site or the surrounding area. During both construction and long-term operation, the Project would be required to maintain adequate emergency access for emergency vehicles as required by the City, BFD, and KCFD. Furthermore, compliance with the fire code and local ordinances would ensure that the Project would not impair an adopted emergency response plan or emergency evacuation plan. Therefore, the Project would not interfere within an adopted emergency response plan or emergency evacuation plan. No impact would occur.

Mitigation Measure
None required.

Level of Significance After Mitigation
No impact with no mitigation required.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.9 Hazards and Hazardous Materials City of Bakersfield – SCH No. 2025101507 4.9-17
Threshold HAZ-7: Would the project expose people or structures, either directly or indirectly, to a significant risk of loss, injury or death involving wildfires?
Impact Analysis
According to CAL FIRE’s FHSZ viewer, the entire Project Site and surrounding area is designated as LRA. The Project site is identified as having no Fire Hazard Severity Zone (FHSZ) and it is not within or near to a VHFHSZ. The closest FHSZ, both moderate and high, is located in a Local Responsibility Area (LRA) and is approximately 4.29 miles northeast of the Project Site, as the uplands around the Kern River transition to Sequioa National Forest. The nearest VHFHSZ in a State Responsibility Area is located 16.17 miles east of the Project Site. As such, it is anticipated that the KCFD would adequately meet the fire protection demands of the proposed Project.

Impacts would be less than significant.

Mitigation Measures
None required.

Level of Significance After Mitigation
No impact with no mitigation required.

Cumulative Impacts
Section 3.3, Cumulative Development, identifies projects within an approximately 1.5-mile radius of the Project Site that are planned, under construction, or have been recently completed. A summary of these projects is provided in Table 3-1, Cumulative Projects List. Potential cumulative impacts would occur if the proposed Project in combination with the identified cumulative projects would result in significant effects to Hazards and Hazardous Materials. For purposes of this analysis, the geographic scope would be the City.

As discussed in this section, the Project site is not located on a hazardous site list compiled pursuant to California Government Code Section 65962.5. The Phase 1 ESA prepared for the Project identified that there is one CREC in connection with the Project Site, and no additional assessment is recommended at the Project Site. The PG&E Kern Power Plant was formerly present in the southern portion of the Project Site, which was demolished, assessed, and remediated under the oversight of the CVRWQCB. The case was closed on June 3, 2019, with a recorded Land Use Covenant. Additionally, the Project Site had oil wells, which have been plugged and abandoned under CalGEM oversight. Additionally, as identified in the Soil Vapor Report, given the site-wide lack of detections and prior site closure, no further assessment is recommended for soil vapor at the site. As such, no hazards currently exist on the Project Site that could affect construction. As with the Project, all related projects identified in Table 3-1 would be required to adhere to applicable federal, State, and local regulations, including the CCR, OHSA, and air quality regulations from CARB and SCAQMD. Therefore, the proposed Project would not combine with other cumulative development projects to result in Hazards and Hazardous Materials impacts; as a result, cumulative impacts would be less than significant.

Mitigation Measures
No mitigation is required.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.9 Hazards and Hazardous Materials City of Bakersfield – SCH No. 2025101507 4.9-18
Level of Significance After Mitigation
The proposed Project would not result in significant cumulative impacts associated within hazards or hazardous materials. No mitigation is required.

City of Bakersfield – SCH No. 2025101507 4.10-1

4.10 Hydrology and Water Quality
This section of the Environmental Impact Report (EIR) identifies and analyzes the hydrologic resources available to the Riverview Marketplace Commercial Project (Project) while assessing the potential impact the Project could have on those resources. The existing water and drainage systems serving the Project Site were used to establish a baseline with which to compare potential impacts associated with the Project and will inform the degree of impact that the proposed Project could have on those existing hydrologic systems. Federal, State, regional, and local regulations will provide appropriate context regarding the hydrologic resources of the Project Site and the surrounding area. Impacts in this section are assessed regarding their effects on water quality, groundwater availability, and other hydrological conditions. The analysis also considers the Project’s potential effects in flood, tsunami, and seiche zones.

Information is based in part on the Southwest Corner of Rosedale Highway and Coffee Road, Bakersfield, California Drainage Study, dated July 24, 2025, and Sewer Area Study. Dated May 13, 2026, prepared by Kimley-Horn, and the Water Supply and Demand Analysis for the Coffee and Rosedale Commercial Retail Development Project for the City of Bakersfield, prepared by Placeworks. These studies are included in Appendix I, Utilities and Hydrology, of this Draft EIR.

During the scoping period for the Project EIR, no comments were received in response to the Notice of Preparation (NOP) regarding hydrology and water quality.

4.10.1 Regulatory Setting
Federal
Federal Emergency Management Agency
FEMA administers the National Flood Insurance Program (NFIP) to provide subsidized flood insurance to jurisdictions that comply with FEMA regulations to limit development within floodplains. FEMA also prepares Flood Insurance Rate Maps (FIRMs) to identify areas subject to flooding. These FIRMs provide flood information and identify flood hazard zones. The design standards for flood protection are also established by FEMA. FEMA’s minimum level of flood protection for new development is the 100-year flood event, also described as a flood having a one percent annual chance of occurring.

In addition, FEMA has created requirements and procedures for evaluating earthen levee systems and mapping areas affected by those systems. Levee systems are evaluated for their ability to provide protection from 100-year flood events, with the results documented in the FEMA Levee Inventory System. Levee systems must meet minimum freeboard standards and must be maintained according to an officially adopted maintenance plan. Other FEMA levee system evaluation criteria include structural design and interior drainage.

Clean Water Act
The U.S. Environmental Protection Agency (EPA) serves as the lead federal agency responsible for water quality management. The Clean Water Act (CWA) of 1972 is the primary federal law that governs and authorizes water quality control activities by the EPA and individual states.

Various elements of the CWA address water quality, as described below. Wetland protection elements, including permits to allow for dredge or fill activities, are administered by the United States Army Corps of Engineers (USACE) under Section 404 of the CWA.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.10 Hydrology and Water Quality City of Bakersfield – SCH No. 2025101507 4.10-2
Under Section 401 of the CWA, applying for a Section 404 permit to discharge dredge or fill material into waters of the United States requires obtaining certification from the appropriate State agency stating that the dredge or fill materials are consistent with the State’s water quality standards and criteria. In California, the authority to grant water quality certification or waive the requirement is delegated by the State Water Resources Control Board (SWRCB) to the nine Regional Water Quality Control Boards (RWQCBs).

Under federal law, the EPA has published water quality regulations within Volume 40 of the Code of Federal Regulations (40 CFR). Section 303 of the CWA requires individual states to adopt water quality standards for all surface waters of the United States. As defined by the CWA, water quality standards consist of two elements: (1) designated beneficial uses of the water body in question and (2) criteria that protect the designated uses. Section 304(a) requires the EPA to publish advisory water quality criteria that reflect the latest scientific knowledge regarding the potential effects on public health and welfare related to the presence of pollutants in water. Where multiple uses exist, water quality standards must protect the most sensitive use. In California, the EPA has designated the SWRCB and its RWQCBs with the authority to identify beneficial uses and adopt water quality criteria.

Safe Drinking Water Act
Under the Safe Drinking Water Act (SDWA) (Public Law 93-523), passed in 1974, the EPA regulates contaminants of concern to domestic water supply. Contaminants of concern relevant to domestic water supply are defined as those that pose a public health threat or that alter the aesthetic acceptability of the water. These types of contaminants are regulated by the EPA’s primary and secondary maximum contaminant levels (MCLs), which are applicable to treated water supplies delivered to a distribution system. MCLs and the process for setting these standards are reviewed once every five years. Amendments to the SDWA enacted in 1986 established an accelerated schedule for setting MCLs for drinking water.

The EPA has delegated to the California Department of Public Health (CDPH) the responsibility for administering California’s drinking-water program. The CDPH is accountable to the EPA for program implementation and for adopting standards and regulations that are at least as stringent as those developed by the EPA. The applicable state primary and secondary MCLs are set forth in Title 22, Division 4, Chapter 15, Article 4 of the California Code of Regulations.

National Pollutant Discharge Elimination System Permit
The National Pollutant Discharge Elimination System (NPDES) permit program was established by the CWA to regulate municipal and industrial discharges to surface waters of the United States from their municipal separate storm sewer systems (MS4s). Federal NPDES permit regulations have been established for a broad range of discharges, including point-source municipal waste discharges and non-point-source stormwater runoff. NPDES permits generally identify effluent and receiving water limits on allowable concentrations and/or mass emissions of pollutants contained in the discharge; prohibitions on discharges not specifically allowed under the permit; and provisions that describe required actions by the discharger, including industrial pretreatment, pollution prevention, self-monitoring, and other activities.

Federal Flood Insurance Program
The U.S. Congress established the National Flood Insurance Program (NFIP) with the passage of the National Flood Insurance Act of 1968. The NFIP is a federal program enabling property owners in participating communities to purchase insurance as protection against flood losses in Riverview Marketplace Commercial Project
Environmental Impact Report 4.10 Hydrology and Water Quality City of Bakersfield – SCH No. 2025101507 4.10-3
exchange for State and community floodplain management regulations that reduce future flood damages. Participation in the NFIP is based on an agreement between communities and the Federal Government. If a community adopts and enforces a floodplain management ordinance to reduce future flood risk to new construction in floodplains, the Federal Government will make flood insurance available within the community as a financial protection against flood losses. This insurance is designed to provide an insurance alternative to disaster assistance to reduce the escalating costs of repairing damage to buildings and their contents caused by floods. The Federal Insurance and Mitigation Administration (FIMA) within FEMA is responsible for administering the NFIP and administering programs that provide assistance for mitigating future damages from natural hazards.

Executive Order 11988 – Floodplain Management
Executive Order 11988 requires federal agencies to avoid, to the extent possible, the long- and short-term adverse impacts associated with the occupancy and modification of floodplains, and to avoid direct and indirect support of floodplain development wherever there is a practicable alternative. In accomplishing this objective, agencies are to take action to reduce the risk of flood loss, to minimize the impact of floods on human safety, health, and welfare, and to restore and preserve the natural and beneficial values served by flood plains.

State
Porter-Cologne Water Quality Control Act
The Porter-Cologne Water Quality Control Act (Porter-Cologne Act) of 1969 is California’s statutory authority for the protection of water quality. Under the Porter-Cologne Act, the state must adopt water quality policies, plans, and objectives that protect the state’s waters for the use and enjoyment of its residents. The Act requires the SWRCB and its RWQCBs to adopt and periodically update water quality control plans (Basin Plans). Basin Plans are the regional water quality control plans required by both the CWA and the Porter-Cologne Act, in which beneficial uses, water quality objectives, and implementation programs are established for each of the RWQCBs.

The act also requires waste dischargers to notify the RWQCBs of their activities through the preparation of Reports of Waste Discharge and authorizes the SWRCB and its RWQCBs to issue and enforce waste discharge requirements, NPDES permits, Section 401 water quality certifications, and other approval actions.

State Water Resources Control Board (SWRCB)
In California, the SWRCB has broad authority over water quality control issues for the State. The SWRCB is responsible for developing statewide water quality policy and exercises the powers delegated to the State by the federal government under the CWA. Other state agencies with jurisdiction over water quality regulation in California include the California Department of Health Services (CDHS) for drinking water regulations, the California Department of Pesticide Regulation (CDPR), the California Department of Fish and Wildlife (CDFW), and the Office of Environmental Health and Hazard Assessment (OEHHA).

Regional authority for planning, permitting, and enforcement is delegated to the RWQCBs. The regional boards are required to formulate and adopt water quality control plans for all areas in the region and establish water quality objectives in those plans. The proposed Project is within the jurisdiction of the Central Valley RWQCB.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.10 Hydrology and Water Quality City of Bakersfield – SCH No. 2025101507 4.10-4
NPDES Permit System and Waste Discharge Requirements for Construction The 1972 amendment to the CWA established the NPDES permit program. The NPDES permit program outlined in the CWA contains effluent limitation guidelines, water quality requirements, and permit program requirements for discharges to waters of the United States. The EPA has overall responsibility for the NPDES program, but administration of the program in California has been delegated to the SWRCB and the nine RWQCBs.

The 1987 amendment to the CWA established a framework for regulating discharges under the NPDES program. In 1990, the EPA promulgated regulations for permitting stormwater discharges from industrial sites, including construction sites that disturb five acres or more, and from municipal separate MS4s serving a population of 100,000 people or more. The November 16, 1990, regulations, known as the Phase I regulations (Title 55 [FR] 47990), rely on NPDES permit coverage to address stormwater runoff from operators of medium and large MS4s, construction activity disturbing five acres of land or greater, and 10 categories of industrial activity.

California Water Code
The California Water Code (CWC) is the principal law regulating water quality in California. Water quality provisions must be complied with as contained in numerous code sections including: 1) the Health and Safety Code for the protection of ground and surface waters from hazardous waste and other toxic substances; 2) the Fish and Game Code for the prevention of unauthorized diversions of any surface water and discharge of any substance that may be deleterious to fish, plant, animal, or bird life; 3) the Harbors and Navigation Code for the prevention of the unauthorized discharge of waste from vessels into surface waters; and 4) the Food and Agriculture Code for the protection of groundwater which may be used for drinking water supplies.

The CDFW, through provisions of the Fish & Game Code (§§ 1601 - 1603), is empowered to issue agreements for any alteration of a river, stream, or lake where fish or wildlife resources may be adversely affected. CDFW regulates wetland areas only to the extent that those wetlands are part of a river, stream, or lake as defined by CDFW (CA Legislative Info, n.d.). Surface water quality is the responsibility of RWQCBs, water supply and wastewater treatment agencies, and city and county governments. The principal means of enforcement by the RWQCBs is through the development, adoption, and issuance of water discharge permits. RWQCB basin plans establish water quality objectives that are defined as the limits or levels of water quality constituents or characteristics for the reasonable protection of beneficial uses of water.

California Toxics Rule
The California Toxics Rule (CTR) fills a gap in California’s water quality standards necessary to protect human health and aquatic life beneficial uses. The CTR supplements and does not change or supersede the criteria that EPA promulgated for California waters in the National Toxics Rule (NTR). The human health NTR and CTR criteria that apply to drinking water sources (those water bodies designated in the Basin Plans as municipal and domestic supply) consider chemical exposure through consumption of both water and aquatic organisms (fish and shellfish) harvested from the water. For waters that are not drinking water sources (e.g., enclosed bays and estuaries), human health NTR and CTR criteria only consider the consumption of contaminated aquatic organisms. The CTR and NTR criteria, along with the beneficial use designations in the Basin Plans and the related implementation policies, are the directly applicable water quality standards for toxic priority pollutants in California waters.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.10 Hydrology and Water Quality City of Bakersfield – SCH No. 2025101507 4.10-5
Watershed Management Initiative
The State and Regional Water Boards are currently focused on looking at entire watersheds when addressing water pollution. The Water Boards adopted the Watershed Management Initiative (WMI) to further their goals. The WMI establishes a broad framework overlying the numerous federal and state-mandated priorities. As such, the WMI helps the Water Boards achieve water resource protection, enhancement, and restoration while balancing economic and environmental impacts. The integrated approach of the WMI involves three main ideas:
• Use water quality to identify and prioritize water resource problems within individual watersheds. Involve stakeholders to develop solutions.
• Better coordinate point source and nonpoint source regulatory efforts. Establish working relationships between staff from different programs.
• Better coordinate local, state, and federal activities and programs, especially those relating to regulations and funding, to assist local watershed groups Sustainable Groundwater Management Act
The 2014 Sustainable Groundwater Management Act (SGMA) requires governments and water agencies of high and medium-priority basins to halt overdraft and bring groundwater basins into balanced levels of pumping and recharge. Under SGMA, these basins should reach sustainability within 20 years of implementing their sustainability plans. The DWR categorizes the priority of groundwater basins. For critically over-drafted basins, which will be in 2040. For the remaining high and medium-priority basins, 2042 is the deadline. The SGMA also requires local public agencies and Groundwater Sustainability Agencies (GSAs) in high- and medium-priority basins to develop and implement Groundwater Sustainability Plans (GSPs) or Alternatives to GSPs.

GSPs are detailed road maps for how groundwater basins will reach long-term sustainability. The Valley portion of Kern County in which the Project site is located is managed by the Kern River Groundwater Sustainability Agency (KRGSA), which is comprised of the City of Bakersfield, Kern Delta Water District, and Improvement District No. 4 of the Kern County Water Agency.

Senate Bill 610 (Chapter 643, Statutes of 2001)
The California Water Code (Water Code) §§ 10910 through 10915 were amended by the enactment of SB 610 in 2002. SB 610 requires an assessment of whether available water supplies are sufficient to serve the water demand generated by large development projects, as well as the reasonably foreseeable cumulative demand in the region over the next 20 years under average normal year, single dry year, and multiple dry year conditions. If groundwater is the supply source, the required assessments must include detailed analyses of historic, current, and projected groundwater pumping and an evaluation of the sufficiency of the groundwater basin to sustain a new project’s demands.

Local
Metropolitan Bakersfield General Plan
The Metropolitan Bakersfield General Plan (General Plan), dated December 2002, was updated in January 2016 per Resolution No. 018-16 and 019-16. At the time this EIR was published for public review, the City was in the process of updating its Bakersfield 2045 General Plan, but it has not yet been adopted. The General Plan includes goals, policies, and directions to achieve Riverview Marketplace Commercial Project
Environmental Impact Report 4.10 Hydrology and Water Quality City of Bakersfield – SCH No. 2025101507 4.10-6
the City’s vision of the community and future development. The General Plan includes 12 elements that focus on: Land Use; Circulation; Housing; Open Space, Conservation; Noise; Safety; Downtown Redevelopment; Public Services Facilities; Parks; Kern River Plan; and Historical Resources.

The General Plan established the following goals, policies, and implementation programs in order to protect the City’s geologic resources and ensure soil stability. The Conservation Element of the Bakersfield Metropolitan General Plan includes the following goals and policies that address hydrology and water quality and are applicable to the Project:

Conservation Element
CON/WR-G-4 Continue cooperative planning for and implementation of programs and projects which will resolve water resource deficiencies and water quality problems.

CON/WR-P-7 Provide substitute or supplemental water resources to areas already impacted by groundwater quality degradation by supporting facilities construction for surface water diversions,
CON/WR-P-8 Consider each proposal for water resource usage within the context of total planning area needs and priorities-major incremental water transport, groundwater recharge, flood control, recreational needs, riparian habitat preservation and conservation.

Safety Element
SAFE/PS-P-13 Determine the liquefaction potential at sites in areas of high groundwater prior to development and determine specific mitigation to be incorporated into the foundation design, as necessary to prevent or reduce damage from liquefaction in an earthquake.

SAFE/PS-G-1 Minimize hazards to planning area residents resulting from flooding.

SAFE/PS-G-2 Reduce the risk of flooding to land uses.

SAFE/PS-G-3 Maintain adequate flood flow capacity in the Kern River channel to prevent flooding from anticipated 100-year design flood flows.

SAFE/PS-P-1 Develop specific standards which apply to development located in flood hazard areas, as defined by Federal Flood Insurance maps and most recent information as adopted by the responsible agency (1-1, 1-2).

SAFE/PS-P-3 Prevent urban development encroachment which would impede flood flows in the Kern River designated floodway (1-3, 1-5).

Public Services and Facilities Element
PSFE/SRMD-G-1 Ensure the provision of adequate storm drainage facilities to protect planning area residents from flooding resulting from stormwater excess.

PSFE/SRMD-P-4 Use drainage area retention basins for drainage disposal when direct discharge to a waterway is not available. Combine storm drainage usage with recreational usage when feasible. Incorporate in such basins recessed areas for off-season retention of nuisance flows. Maintain all basins with Riverview Marketplace Commercial Project
Environmental Impact Report 4.10 Hydrology and Water Quality City of Bakersfield – SCH No. 2025101507 4.10-7
the primary purpose of drainage disposal, with recreational usage as a secondary objective.

Urban Water Management Planning Act
Through the Urban Water Management Planning Act of 1983, the California Water Code requires all urban water suppliers within California to prepare and adopt a UWMP and to update the plan every five years. This applies to all suppliers providing water to more than 3,000 customers or supplying more than 3,000 acre-feet (af) of water annually. The Act is intended to support conservation and efficient use of urban water supplies at the local level. The Act requires that total projected water use be compared to water supply sources over the next 20 years in five-year increments, that planning occur for single- and multiple dry water years, and that plans include a water recycling analysis that incorporates a description of the wastewater collection and treatment system within the agency’s service area along with current and potential recycled water uses.

4.10.2 Environmental Setting
Hydrology
The Project Site is “L”- shaped, with the northern property line bordering Rosedale Highway and the eastern property line bordering Coffee Road. The eastern portion of the site is bound by a gravel-paved staging/storage area to the south and a PG&E substation/Kern Power Plant to the west. The western portion of the site is bound by El Toro Viejo Road and a fast-food restaurant at the corner of El Toro Viejo Road and Rosedale Highway to the west, and the PG&E substation/Kern Power Plant to the south. The site is predominantly undeveloped, with the eastern portion being used as a staging/storage area; large power poles and electrical lines cross the middle of the site, spanning from the PG&E substation to Rosedale Highway, and two tank structures within the northeastern portion of the site that are surrounded by a chain link fence.

The ground surface is predominantly soil with some small weeds spread across the site and gravel access/staging areas within the eastern portion of the site. Within the western third of the site are 5- to 8-foot-high raised access roads that appear to have been created to access oil pump jacks.

The current USGS topographic map (Oildale Quadrangle 2022) indicates that the Project Site is situated at an elevation of approximately 390 feet above mean sea level, with topography sloping gently down to the west. The adjacent topography consists of relatively flat land.

Flood Hazard
The Federal Emergency Management Agency (FEMA) Flood Insurance Rate Map (FIRM) for the Project area shows the Project Site being covered by one map panel, 06029C1825F. 1 The entirety
of the Project Site is classified as Zone X, an area noted as having a minimal flood hazard. The Project is not located near any dams, reservoirs, or large water bodies.

Water Quality
The U.S. Geological Survey defines water quality as “a measure of the suitability of water for a particular use based on selected physical, chemical, and biological characteristics."2 This can be 1 Federal Emergency Management Agency (FEMA),2023. Flood Insurance Rate Map. Available at:
https://msc.fema.gov/arcgis/rest/directories/arcgisjobs/nfhl_print/mscprintb_gpserver/j2c884ebb19b942098395a380957e7568/scratch/FIR METTE_56ca9c51-79a2-4cd0-8907-d7577bde9f8f.pdf. Accessed May 2026. 2 U.S. Geological Survey, Water Quality Information by Topic. Available at: https://www.usgs.gov/special-topics/water-science-school/science/water-quality-information-topic. Accessed May 2026.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.10 Hydrology and Water Quality City of Bakersfield – SCH No. 2025101507 4.10-8
determined by the quantity of undesired constituents or pollutants in the water and their characteristics. Typical pollutants associated with construction would include sediments from disturbing soils, fuels, lubricants, and liquid waste. From operations, typical pollutants would include cleaning solvents, pesticides from landscaping, and petroleum products. While some level of constituents may be acceptable for certain uses (e.g., dust mitigation on a construction site) it may be unsuitable for others (e.g., drinking water). In an urban environment, the quantity of certain pollutants in the stormwater systems is generally associated with the type and intensity of the land use. Highly urban land uses will produce different and varying quantities of pollutants than rural land uses.

The Project Site is currently undeveloped and is currently vacant, so there is no activity on site.

Five “plugged” oil and gas production wells, two “plugged” oil and gas production wells, one “plugged” waterflood well, and three “abandoned/removed tanks” are mapped as located on the Project Site. According to the Phase I ESA, the oil wells were plugged and abandoned to current CalGEM standards. As noted in the Well Engineering Report, the original existing plugging and abandonment of both wells was approved by CalGEM’s predecessor at the time as adequately meeting the requirement for protecting all subsurface strata, ground water, and the surface.

Accordingly, there is less potential for the introduction of certain pollutants into the surrounding environment.

Groundwater
The City pumps groundwater and recharges surface water from the Kern County Subbasin, which is part of the larger San Joaquin Valley Groundwater Basin. The Kern County Subbasin is designated as critically overdrafted and identified as a high-priority basin by the California Department of Water Resources (DWR). It is not currently adjudicated.

The City, along with five other agencies, is a member of the Kern River Groundwater Sustainability Agency (KRGSA) which covers approximately 232,499 acres of land overlying the Kern County Subbasin. The KRGSA was formed in compliance with the Sustainable Groundwater Management Act to cooperatively manage local groundwater in a sustainable manner. KRGSA, along with other GSAs within the Kern County Subbasin, collectively submitted the Draft Kern County GSP which was adopted by DWR in December of 2024.

The City’s Water Resources Department operates a Domestic Water System and a Wholesale Water System. The primary source of supply for the Domestic Water System, a retail water supplier that operates under a service contract with California Water Service (Cal Water), is groundwater and recharged surface water pumped from city-owned wells. This is supplemented by surface water supplies from treatment plants owned by Cal Water and Kern County Water Agency Improvement District No. 4’s (KCWA ID4).

4.10.3 Impact Analysis
Methodology
Southwest Corner of Rosedale Highway and Coffee Road, Bakersfield, California Drainage Study and Sewer Area Study (Drainage Study and Sewer Area Study, respectively), prepared by Kimley-Horn, and Water Supply and Demand Analysis (WSA), prepared by Placeworks, have been prepared for the Project and are included in Appendix I. The Drainage Study (See Appendix I-2) was prepared consistent with the City of Bakersfield Hydrology Manual and utilizes City Standards for determining sizing of stormwater basin(s) on the Project Site by analyzing the Riverview Marketplace Commercial Project
Environmental Impact Report 4.10 Hydrology and Water Quality City of Bakersfield – SCH No. 2025101507 4.10-9
volume from a 100-year, 24-hour storm event to determine retention basin requirements, size the basins to be able to retain the volumes while provided the required one inch of freeboard, and size the pipes to adequately convey the 100-year peak flow rate obtained from the rational method.

Similarly, the Sewer Area Study (Appendix I-3) calculates remaining downstream sewer capacity for the Project and utilizes City Standards for determining existing and proposed sewer flow by monitoring existing sewer manholes to determine existing peak dry weather flows, quantifying the proposed flows from the Project based on City sewer generation rates, quantifying sewer flows from future downstream projects, and analyzing critical sewer segments for available capacities post project completion.

The WSA (Appendix I-1) assesses the adequacy of water supplies to meet the Project’s water demand in addition to future water demands within the City of Bakersfield’s service area. The analysis documents whether the City’s total projected water supplies for normal, single dry, and multiple dry water years over a 20-year period will meet the proposed project’s projected water demand as well as future service area demands.

To establish existing conditions, several data sources were consulted, including FEMA, the National Oceanic and Atmospheric Administration (NOAA) Atlas, the United States Department of Agriculture (USDA) Natural Resources Conservation Service web soil survey, the SWRCB, the California Geological Survey, the RWQCB, and City documents. To identify potential impacts, the Project was compared to existing conditions and then evaluated for potential impacts per the significance thresholds identified below.

To identify potential impacts related to flood hazards the FEMA FIRMette was used to identify the Project Site relative to flood zones, and geographical analysis was employed to identify the Project Site relative to bodies of water with flooding potential. To identify potential impacts related to tsunamis, the California Geological Survey Tsunami Mapper application was employed to identify the Project site relative to tsunami zones. To identify potential impacts related to seiche, geographic analysis was employed to identify the Project Site’s location relative to large standing bodies of water. Finally, applicable water quality control plans and federal, State, and local regulations and plans were evaluated to determine whether the proposed project would violate any applicable regulations or standards.

Thresholds of Significance
The City utilizes the California Environmental Quality Act (CEQA) Guidelines, Appendix G, and thresholds of significance3to analyze the environmental impacts of the Project. Per CEQA Guidelines, an impact is considered significant if the Project would:
• Violate any water quality standards or waste discharge requirements or otherwise substantially degrade surface or groundwater quality;
• Substantially decrease groundwater supplies or interfere substantially with groundwater recharge such that the project may impede sustainable groundwater management of the basin;
3 Association of Environmental Professionals (AEP). 2025. CEQA Guidelines Appendices, Appendix G: Environmental Checklist Form. Available at: https://www.califaep.org/docs/CEQA_Handbook_2025combined.pdf. Accessed January 2026.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.10 Hydrology and Water Quality City of Bakersfield – SCH No. 2025101507 4.10-10
• Substantially alter the existing drainage pattern of the site or area, including through the alteration of the course of a stream or river or through the addition of impervious surfaces, in a manner which would:
▪ Result in substantial erosion or siltation on- or off-site; ▪ Substantially increase the rate or amount of surface in a manner which would result in flooding on- or off-site;
▪ Create or contribute runoff water which would exceed the capacity of existing or planned stormwater drainage systems or provide substantial additional sources of polluted runoff;
▪ Impede or redirect flood flows;
• In flood hazard, tsunami, or seiche zones, risk of release of pollutants due to project inundation; or
• Conflict with or obstruct the implementation of a water quality control plan or sustainable groundwater management plan.

Project Impacts
Threshold HWQ-1: Would the project violate any water quality standards or waste discharge requirements or otherwise substantially degrade surface or ground water quality?
Impact Analysis
Construction
Construction of the Project would include site preparation and other earthwork activities that have the potential to result in erosion on and adjacent to the Project site. If erosion is not prevented or contained, sediments and particulates, along with any contaminants found within, could potentially be conveyed offsite and into downstream waters, causing water quality degradation and the subsequent violation of water quality standards. Additionally, disturbed soils have an increased potential for fugitive dust to be released into the air and carried offsite. The Project would be required to comply with the NPDES General Permit for stormwater discharges. Construction activities subject to the General Permit include clearing, grading, stockpiling, and excavation. To conform to the requirements of the General Permit, a SWPPP would need to be prepared that specifies Best Management Practices (BMPs) to prevent construction pollutants from moving offsite. According to the State Water Resources Board, the Project is required to comply with the General Permit because project-related construction activities would disturb at least one acre of soil.

The City owns and maintains a municipal separate storm sewer system (MS4). The Project’s operational urban stormwater discharges are covered under the Central Valley Water Quality Control Board (CVRWQCB) National Pollutant Discharge Elimination System Permit and Waste Discharge Requirements General Permit for Discharges from Municipal Separate Storm Sewer Systems (Order No. R5-2016-0040; NPDES No. CAS0085324) (MS4 Permit). The MS4 Permit mandates the implementation of a stormwater management framework to ensure that water quality is maintained within the city because of operational stormwater discharges throughout the City, including the project site. By complying with the General Permit and MS4 Permit, the project Riverview Marketplace Commercial Project
Environmental Impact Report 4.10 Hydrology and Water Quality City of Bakersfield – SCH No. 2025101507 4.10-11
would not violate any water quality standards or waste discharge requirements, and impacts would be less than significant.

Operations
During operation, the Project would not involve storage of substantial hazardous materials on-site. Potential pollutants would be typical of commercial development, such as cleaning solvents and pesticides for landscaping. Stormwater, including runoff from the proposed building and designated parking areas, could carry pollutants into public storm drains during operations.

The City owns and maintains a municipal separate storm sewer system (MS4). The Project’s operational urban stormwater discharges are covered under the Central Valley Water Quality Control Board (CVRWQCB) National Pollutant Discharge Elimination System Permit and Waste Discharge Requirements General Permit for Discharges from Municipal Separate Storm Sewer Systems (Order No. R5-2016-0040; NPDES No. CAS0085324) (MS4 Permit). The MS4 Permit mandates the implementation of a stormwater management framework to ensure that water quality is maintained within the city because of operational stormwater discharges throughout the City, including the project site. By complying with the General Permit and MS4 Permit, the project would not violate any water quality standards or waste discharge requirements, and impacts would be less than significant.

Mitigation Measures
None required.

Level of Significance After Mitigation
Less than significant impact. No mitigation is required.

Threshold HWQ-2: Would the project substantially decrease groundwater supplies or interfere substantially with groundwater recharge such that the project may impede sustainable groundwater management of the basin?
Impact Analysis
As discussed above, the City operates both a Domestic Water System and a Wholesale Water System. The water supply sources for the Domestic Water System are groundwater and recharged surface water supplies pumped from City owned wells and treated surface water from two water treatment plants. The WSA prepared for the Project analyzed the Project’s impact on the Domestic Water System because it is the water available for municipal supply within the Project area. The 2020 City’s Domestic Water System’s water supply was approximately 74 percent groundwater, 25 percent surface water, and one percent recycled water.

The WSA (Appendix I) includes projections for 2025 through 2040 that show that the City’s Domestic Water System will be able to meet demands with projected supplies under normal and drought conditions. Water demand would increase from 52,430 acre feet per year (afy) in 2025 to 63,834 afy in 2030 under normal conditions and would increase from 42,662 afy to 46,642 afy for the fifth consecutive drought year. The water use projections have not been adjusted to account for future water savings from codes, standards, or ordinances, or transportation and land use plans and are therefore very conservative.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.10 Hydrology and Water Quality City of Bakersfield – SCH No. 2025101507 4.10-12
The Project’s water demand at Project buildout in 2027 is anticipated to be 166.8 afy, which amounts to less than one percent of the City’s total water demand for normal-year conditions for the year 2030. Further, the City’s Urban Water Management Plan (UWMP) projects an increase in water demand of 9,224 afy from 2020 to 2030. More specifically, the water demand for the commercial land use sector would increase by 1,876 afy from 2020 to 2030. The estimated Project water demand of 166.8 afy is only 8.9 percent of the increase in demand for the commercial land use sector and thus is accounted for in the UWMP as part of the future development in the City.

Moreover, as noted in the WSA, the City can also increase the use of its groundwater wells during years of reduced Kern River supplies. The City’s Kern River supplies replenish the groundwater basin to provide reliability of groundwater supplies for a five-year drought. In addition, water conservation efforts accomplished by implementing the Water Shortage Contingency Plan would further reduce water demands by 10 to 15 percent during drought conditions. Therefore, as concluded in the WSA, the Project’s Domestic Water System can adequately meet the Project's demand without depleting groundwater or affecting its overall quality. Accordingly, the Project would not significantly impact local groundwater recharge or impede sustainable groundwater management of the basin. Impacts would be less than significant.

Mitigation Measures
None required.

Level of Significance After Mitigation
Less than significant impact. No mitigation is required Threshold HWQ-3a: Would the project substantially alter the existing drainage pattern of the site or area, including through the alteration of the course of a stream or river or through the addition of impervious surfaces, in a manner which would result in substantial erosion or siltation on- or off-site?
Impact Analysis
The Project Site does not currently contain any streams or rivers that would be impacted by the implementation of the Project. As discussed in the Hydrology Study (see Appendix I), under existing conditions, the Project Site ground surface is predominantly soil with some small weeds spread across the site and gravel access/staging areas within the eastern portion of the site.

Within the western third of the site are 5- to 8-foot-high raised access roads.

As discussed under Threshold HWQ-1, the Project would be required to comply with the NPDES General Permit for stormwater discharges. Construction activities subject to the General Permit include clearing, grading, stockpiling, and excavation. To conform to the requirements of the General Permit, a SWPPP would need to be prepared that specifies BMPs to prevent construction pollutants from moving offsite, as well as establish measures to reduce the potential for erosion.

Implementation of the Project would involve approximately 1,656,775 square feet of impervious area and approximately 426,810 square feet of pervious area, resulting in an impervious ratio of

0.8. However, the Project proposes to implement a retention basin as well as multiple catch basins that would be sized to adequately treat runoff water from the Project site as shown in the Drainage Study. As such, the Project would not result in on-site and off-site erosion and siltation. Impacts would be less than significant.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.10 Hydrology and Water Quality City of Bakersfield – SCH No. 2025101507 4.10-13
Mitigation Measures
None required.

Level of Significance After Mitigation
Less than significant impact. No mitigation is required.

Threshold HWQ-3b: Would the project substantially alter the existing drainage pattern of the site or area, including through the alteration of the course of a stream or river or through the addition of impervious surfaces, in a manner which would substantially increase the rate or amount of surface runoff in a manner which would result in flooding on- or off-site? Impact Analysis
Per the FEMA FIRMette for the proposed Project area, the Project site is located within Zone X, which denotes an area with reduced flood risk. While upon completion of construction, the amount of impervious surface on the Project Site would be increased when compared to existing conditions, the Project’s drainage facilities would be designed to ensure that all on- and off-site drainage and storm drain facilities would be adequately sized to accommodate runoff from storm events consistent with the recommendations included in the Drainage Study (Appendix I-2).

Furthermore, the proposed drainage design would be reviewed and approved by the City to ensure that the Project does not result in increased flows off-site or otherwise significantly impact downstream drainage facilities. Additionally, the proposed Project would not alter the course of a stream or river that would result in flooding. Accordingly, the proposed development would not cause additional flooding or substantial runoff, exceed the capacity of existing drainage facilities, or impede or redirect flood flows such that on-site or off-site areas are significantly impacted.

Impacts would be less than significant.

Mitigation Measures
None required.

Level of Significance After Mitigation
Less than significant impact with no mitigation required.

Threshold HWQ-3c: Would the project substantially alter the existing drainage pattern of the site or area, including through the alteration of the course of a stream or river or through the addition of impervious surfaces, in a manner which would create or contribute runoff water which would exceed the capacity of existing or planned stormwater drainage systems or provide substantial additional sources of polluted runoff? Impacts Analysis
The Project would include the addition of impervious surfaces as well as on-site stormwater infrastructure that would be sized to meet the drainage needs of the Project. As discussed in the Sewer Area Study (Appendix I-3), upon completion of construction, Project sewer flows will be conveyed on-site through an underground sewer main of various sizes, generally from east to west, connecting to the existing 36-inch City sewer main in El Toro Viejo Road. The City sewer Riverview Marketplace Commercial Project
Environmental Impact Report 4.10 Hydrology and Water Quality City of Bakersfield – SCH No. 2025101507 4.10-14
main traverses south across a vacant parcel, turns west on Brimhall Road, and continues to Jewetta Avenue where it increases in size to 42 inches and turns south. The 42-inch main continues south across the Kern River and increases in size to a 48-inch main at Bolthouse Drive.

The 48-inch main continues south on Buena Vista Road until it turns east at McCutchen Road.

The sewer main continues east to the sewer lift station located at the southeast corner of McCutchen Road and Gosford Road. As concluded in the Sewer Area Study, the Project contributes only two percent of the existing flows and one percent of the cumulative flows.

Therefore, the Project’s impact on the City sewer is an insignificant addition to the downstream system.

Additionally, the Project’s operational urban stormwater discharges are covered under the CVRWQCB MS4 Permit, which mandates the implementation of a stormwater management framework to ensure that water quality is maintained within the City because of operational stormwater discharges throughout the City, including the Project site. By complying with the General Permit and MS4 Permit, the Project would not cause substantial additional sources of polluted runoff or overwhelm the existing stormwater and sewer infrastructure. Accordingly, impacts would be less than significant.

Mitigation Measures
None required.

Level of Significance After Mitigation
Less than significant impact. No mitigation is required.

Threshold HWQ-3d: Would the project substantially alter the existing drainage pattern of the site or area, including through the alteration of the course of a stream or river or through the addition of impervious surfaces, in a manner which would impede or redirect flood flows?
Impact Analysis
The Project would include a detention basin on the northern portion of the Project Site that would be fenced and screened with landscaping. The Project would not alter the course of a stream or river and would not substantially increase impervious surface in a manner that would result in impediments to or redirection of flood flows. The Project site is located within FEMA Zone X, which denotes an area with reduced flood risk. Even in the event of a flood, the proposed Project would not introduce new structures or surfaces that would substantially affect flood waters. Any impact would be less than significant.

Mitigation Measures
None required.

Level of Significance After Mitigation
Less than significant impact. No mitigation is required.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.10 Hydrology and Water Quality City of Bakersfield – SCH No. 2025101507 4.10-15
Threshold HWQ-4: Would the project if in flood hazard, tsunami, or seiche zones, risk the release of pollutants due to project inundation?
Impact Analysis
The Project site is not located within a floodplain. There are no nearby levees that would be susceptible to failure or flooding of the site. The Project site, like most of the city, is located within the Lake Isabella flood inundation area, which is the area that would experience flooding in the event that there was a catastrophic failure of the Lake Isabella Dam. There is an approved Lake Isabella Dam Failure Evacuation Plan that establishes a process and procedures for the mass evacuation and short-term support of populations at risk below the Lake Isabella Dam. The City would utilize the evacuation plan to support its Emergency Operations Plans (EOPs). With the implementation of the evacuation plan, the Project would not expose people or structures to a significant risk of loss, injury, or death involving flooding, including flooding as a result of the failure of a levee or dam. Accordingly, the proposed Project is not within a zone with risk of seiche, and there is minimal risk of release of pollutants due to seiche-related project inundation. Impacts would be less than significant.

Mitigation Measures
None required.

Level of Significance After Mitigation
Less than significant impact. No mitigation is required Threshold HWQ-5: Would the project conflict with or obstruct implementation of a water quality control plan or sustainable groundwater management plan? Impact Analysis
The City pumps groundwater and recharges surface water from the Kern County Subbasin, which is part of the larger San Joaquin Valley Groundwater Basin. The Kern County Subbasin is designated as critically over drafted and identified as a high-priority basin by the DWR. It is not currently adjudicated.

The City, along with five other agencies, is a member of the KRGSA which covers approximately 232,499 acres of land overlying the Kern County Subbasin. The KRGSA was formed in compliance with the Sustainable Groundwater Management Act to cooperatively manage local groundwater in a sustainable manner. KRGSA, along with other GSAs within the Kern County Subbasin, collectively submitted the Draft Kern County GSP which was adopted by DWR in December of 2024. The GSP aims to maintain water levels above the Minimum Threshold levels to allow the City’s wells to meet the demands of the Domestic Water System while minimizing undesirable results such as declining pump capacity, well inefficiency, water levels falling below pump intakes and pump screens, and degraded water quality. The City’s groundwater operations are subject to compliance with the requirements of the GSP.

Optimization of the City’s Kern River supplies to promote the goals of the GSP involves the full use of the City’s available Kern River entitlement. The Kern River Conjunctive Use Optimization project would be implemented over time so that it can be adjusted to meet changing conditions.

The City’s Kern River supplies would be delivered as a first priority to meet demands of the surface water treatment plants, with the remaining supplies being recharged to the groundwater basin through the Kern River channel, the 2,800-acre recharge facility, Truxtun Lake, and other City Riverview Marketplace Commercial Project
Environmental Impact Report 4.10 Hydrology and Water Quality City of Bakersfield – SCH No. 2025101507 4.10-16
park facilities. Additional Kern River supplies may become available to the City through an Application to Appropriate Water filed with the SWRCB. As noted in the WSA (Appendix I-1) prepared for the proposed Project, the City can increase use of their groundwater wells during years of reduced Kern River supplies. The City’s Kern River supplies replenish the groundwater basin to provide reliability of groundwater supplies for a five-year drought. In addition, water conservation efforts accomplished by implementing the Water Shortage Contingency Plan would result in reductions in water demands by 10 to 15 percent during drought conditions. The proposed Project would not result in substantial degradation of water quality or drawdown of groundwater supplies and would not conflict with or obstruct implementation of a water quality control plan or sustainable groundwater management plan. Therefore, this impact would be less than significant.

Mitigation Measures
None required.

Level of Significance After Mitigation
Less than significant impact. No mitigation is required.

Cumulative Impacts
Impact Analysis
All the proposed projects in the area would be subject to State and local water quality regulations, whose robustness is sufficient to ensure that the combined water quality effects of each project would not be cumulatively considerable. With respect to construction operations, projects would comply with the State’s NPDES Construction General Permit, requiring implementation of a stormwater pollution prevention plan during construction activities. During operation, no project would directly discharge stormwater into receiving waters. Rather, on-site runoff would be treated in bio-retention basins prior to entering the downstream system. Therefore, cumulative impacts would be less than significant.

Mitigation Measures
None required.

Level of Significance After Mitigation
Less than significant impact. No mitigation is required.

City of Bakersfield – SCH No. 2025101507 4.11-1

4.11 Land Use and Planning
This section discusses the potential land use and planning impacts associated with the Riverview Marketplace Commercial Project (Project). Potential effects are evaluated based on the proposed Project’s potential to physically divide an established community and/or cause a significant environmental impact due to a conflict with any land use plan, policy, or regulation adopted for the purpose of avoiding or mitigating an environmental effect. This analysis is based on a review of the relevant regulatory setting, existing conditions, and a discussion of the thresholds used to determine whether a Project would result in significant impacts to land use and planning.

Information in this section is based, in part, on the Metropolitan Bakersfield General Plan (General Plan) and the City of Bakersfield (City) Municipal Code (BMC) Title 17(Zoning Ordinance).

During the scoping period for the Project’s Environmental Impact Report (EIR), comments were received regarding potential issues related to urban decay.

4.11.1 Regulatory Setting
Federal
There are no federal regulations related to land use and planning applicable to the Project.

State
State Planning and Zoning Law
California’s planning law (California Government Code [Gov Code] Section 65300) requires every city and county in California to adopt a comprehensive, long-term general plan for physical development of a city or county. A general plan should consist of an integrated and internally consistent set of goals and policies that are grouped by topic into a set of elements and are guided by a citywide vision. The mandatory elements for all jurisdictions are land use, circulation, housing, conservation, open space, noise, and safety. Cities and counties in the San Joaquin Air Pollution Control District must also address air quality in their general plans. Cities and counties that have identified disadvantaged communities must also address environmental justice in their general plans, including air quality.

Additionally, each of the specific and applicable requirements in the state planning law should be examined to determine if there are environmental issues within the city that a general plan should address.

California’s zoning law (Gov Code Section 65800) requires every county and city in California to adopt regulatory ordinances that dictate site-specific land use, building heights, set-backs, and density. The zoning law also requires that county or city zoning ordinances be consistent with the general plan of the county or city and that a zoning ordinance be amended within a reasonable time so that it is consistent with the general plan in the event that the ordinance becomes inconsistent with the plan by reason of amendment to the plan. While Government Code Section 65700 provides a general exemption for charter cities with a population under 2 million, the City of Bakersfield has committed by Resolution
Assembly Bill 72 (2017) HCD Oversight
Assembly Bill (AB) 72 strengthens the ability of the California Department of Housing and Community Development (HCD) to enforce housing laws that require local governments to Riverview Marketplace Commercial Project
Environmental Impact Report 4.11 Land Use and Planning
City of Bakerfield – SCH No. 2025101507 4.11-2
achieve housing goals. Specifically, it requires HCD to review any action or failure to act by a local agency that it determines is inconsistent with an adopted housing element and to issue findings whether the action or failure to act substantially complies with the housing element. Under AB 72, HCD can find a jurisdiction out of compliance with state housing law at any time. HCD may review local government’s actions and inactions, including program actions committed within an adopted housing element, to determine consistency or inconsistency with state housing law. If HCD makes findings of inconsistency, housing element compliance may be revoked and additional actions may be taken, including referral to the Attorney General’s Office. 1 Assembly Bill 1397 (2017) Residential Development Inventory Assembly Bill (AB) 1397 adds to existing law that requires jurisdictions to include an inventory of land suitable for residential development in their housing elements, including vacant sites and sites having the potential for redevelopment. Under AB 1397, housing element law is strengthened by limiting the reliance of local governments on sites that do not have a realistic capacity for development of housing. Specifically, AB 1397 makes changes to the definition of land suitable for residential development to increase the number of sites where new multifamily housing can be built. It requires the inventory of land to be available for residential development in addition to being suitable for residential development and to include vacant sites and sites that have "realistic and demonstrated potential for redevelopment during the planning period to meet the locality's housing need for a designated income level."2 Senate Bill 166 (2017) “No Net Loss” Law
Senate Bill (SB) 166 (Gov Code Section 65863) was adopted to ensure development opportunities remain available throughout the planning period to accommodate a jurisdiction’s regional housing need allocation (RHNA), especially for lower- and moderate-income households.

Under SB 166, a jurisdiction must maintain adequate sites to accommodate its remaining, unmet RHNA by each income category at all times throughout the entire planning period. It may not take any action to reduce a parcel’s residential density unless it makes findings that the remaining sites identified in its Housing Element sites inventory can accommodate the jurisdiction’s remaining unmet RHNA by each income category, or if it identifies additional sites so that there is no net loss of residential unit capacity. It requires jurisdictions that approve a development of a parcel identified in its Housing Element sites inventory with fewer units than shown in the Housing Element, it must either make findings that the Housing Element’s remaining sites have sufficient capacity to accommodate the remaining unmet RHNA by each income level or identify and make available sufficient sites to accommodate the remaining unmet RHNA for each income category.

SB 166 also prevents a jurisdiction from disapproving a housing project on the basis that approval of the development would trigger the identification or zoning of additional adequate sites to accommodate the remaining RHNA.3
Office of Land Use and Climate Innovation
The Governor’s Office of Land Use and Climate Innovation (LCI) is responsible for the State’s long-range planning and research and constitutes the comprehensive State planning agency. The 1 Holland & Knight. A Closer Look at California’s New Housing Production Laws. Available at:
https://www.hklaw.com/files/Uploads/Documents/Articles/WhitePaper/CaliforniasNewHousingProductionLaws.pdf. Accessed March 2026.
2 Ibid.
3 California Department of Housing and Community Development. 2019. No Net Loss Law Government Code Section 65963. Available at: https://www.hcd.ca.gov/community-development/housing-element/housing-element-memos/docs/sb-166- final.pdf. Accessed March 2026.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.11 Land Use and Planning
City of Bakersfield – SCH No. 2025101507 4.11-3
LCI is responsible for the formulation of long-range land use goals and policies, the management of State planning grants, and the encouragement of local and regional planning. It also creates and adopts General Plan Guidelines as well as the CEQA Guidelines (for adoption by the Secretary of Natural Resources). LCI is also responsible for operating the State Clearinghouse for distribution and review of CEQA documents.4 Prior to July 1, 2024, this agency was referred to as the Governor’s Office and Planning and Research.

Urban Decay Analysis
CEQA Guidelines Section 15131 states that “[e]conomic or social information may be included in an EIR or may be presented in whatever form the agency desires.” While economic and social effects of a project are not treated as significant effects on the environment, “[a]n EIR may trace a chain of cause and effect from a proposed decision on a project through anticipated economic or social changes resulting from the project to physical changes caused in turn by the economic or social changes (14 CCR Section 15131(a)). In turn, social or economic effects of a project may be used to determine the extent of any physical changes caused by the project (14 CCR Section 15131(b)).

The physical manifestation of a project’s socioeconomic impact is referred to as “urban decay.” (See Bakersfield Citizens for Local Control v. City of Bakersfield (2004) 124 Cal.App.4th 1184.) As it relates to commercial retail projects, a variety of factors are considered when determining whether an analysis of this indirect impact is warranted under CEQA, including project size, its proximity to other shopping opportunities and the anticipated type of retailers and their market areas. (Id. at p. 1207.) Essentially the questions to be resolved when analyzing urban decay are:
1) will the proposed project cause the closure of existing retail establishments; and 2) would closure(s) result in extended vacancies that cause physical changes defined as urban decay.

Regional
Local
Metropolitan Bakersfield General Plan
The General Plan, dated December 2002, was updated in January 2016 per Resolution No. 018- 16 and 019-16. At the time this EIR was published for public review, the City was in the process of updating its Bakersfield 2045 General Plan, but it had not yet been adopted. The General Plan includes goals, policies, and directions to achieve the City’s vision of the community and future development. The General Plan includes 12 elements that focus on: Land Use; Circulation; Housing; Open Space: Conservation; Noise; Safety; Downtown Redevelopment; Public Services Facilities; Parks; Kern River Plan; and Historical Resources.

The General Plan established the following goals and policies related to land use and planning:

Land Use Element
LAND/GEN-G-1 Accommodate new development which captures the economic demands generated by the marketplace and establishes Bakersfield’s role as capital of the southern San Joaquin Valley.
4 California Governor’s Office of Land Use and Climate Innovation. 2026. About Us, Responsibilities webpage. Available at:
https://lci.ca.gov/about/responsibilities.html. Accessed March 2026.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.11 Land Use and Planning
City of Bakerfield – SCH No. 2025101507 4.11-4
LAND/GEN-G-2 Accommodate new development which provides a full mix of uses to support its population.

LAND/GEN-G-3 Accommodate new development which is compatible with and complements existing land uses.

LAND/GEN-G-4 Accommodate new development which channels land uses in a phased, orderly manner and is coordinated with the provision of infrastructure.

LAND/GEN-G-6 Accommodate new development that is sensitive to the natural environment, and accounts for environmental hazards.

LAND/GEN-G-7 Establish a built environment which achieves a compatible functional and visual relationship among individual buildings and sites.

LAND/GEN-G-8 Target growth companies that meet clean air requirements and create sustainable employment in jobs paying higher wages.

LAND/CD-P-15 Allow for the development of a variety of commercial centers/corridors which are differentiated by their function, intended users and level of intensity, including convenience centers serving local residential neighborhoods, sub-regional centers which serve groupings of neighborhoods, and major regional centers which serve the planning area and surrounding areas.

LAND/CD-P-16 Allow for the development of a variety of commercial uses, including those which serve residents (groceries, clothing, etc.), highway users, and tourists-visitors.

LAND/CD-P-18 Require all new commercial designations be assigned to sites where the aggregate of all contiguous parcels designated for commercial use is no less than five (5) acres, except for approved specific plans, parcels to be developed for highway-oriented service uses at freeway on- and off-ramps, or where physical conditions are such that commercial is the only logical use of the property.

LAND/CD-P-19 Allow for the intensification and development of existing commercial areas in an infill fashion.

LAND/CD-P-20 The depth of new commercial developments shall be at least half the length of the street frontage. Exceptions may be made where existing development or physical constraints provide a more logical shape.

LAND/CD-P-24 Encourage the clustering of commercial development in compact areas, rather than extended along streets and highways.

LAND/CD-P-25 Provide for infill of commercial land uses to be compatible with the scale and character of existing commercial districts and corridors.

LAND/CD-P-26 Encourage adjacent commercial uses to be of compatible height, setback, color and materials.

LAND/CD-P-28 Require that commercial development provide design features such as screen walls, landscaping and height, setback and lighting restrictions Riverview Marketplace Commercial Project
Environmental Impact Report 4.11 Land Use and Planning
City of Bakersfield – SCH No. 2025101507 4.11-5
between the boundaries of adjacent residential land use designations so as to reduce impacts on residences due to noise, traffic, parking, and differences in scale.

LAND/CD-P-30 Street frontages along all new commercial development shall be landscaped.

LAND/CD-P-30.A Require new large retail commercial development projects to evaluate decay impacts on existing commercial uses as set forth in the implementation measures.

LAND/CD-P-30.B Require perimeter street(s) around new commercial office, retail, mixed-use, and industrial business park land uses where they will enhance pedestrian and vehicular access from adjacent residential neighborhoods or promote convenient access to public transit services, and where anticipated traffic will not detrimentally impact local streets. Exceptions may be allowed if natural or artificial barriers such as, but not limited to, railroads, utility corridors, canals or other watercourses, or topographic features exist that create a logical separation between the uses, or to encourage infill development.

LAND/GEN-P-76: Provide for a mix of land uses which meets the diverse needs of residents; offers a variety of employment opportunities; capitalizes, enhances, and expands upon existing physical and economic assets; and allows for the capture of regional growth.

LAND/GEN-P-78: Accommodate new projects which are infill or expansion of existing urban development.

LAND/GEN-P-79: Provide for an orderly outward expansion of new "urban" development (any commercial, industrial, and residential development having a density greater than one unit per acre) so that it maintains continuity of existing development, allows for the incremental expansion of infrastructure and public services, minimizes impacts on natural environmental resources, and provides a high quality environment for living and business.

LAND/GEN-P-81: Allow for flexibility in the specific siting of multi-family residential and commercial uses from the locations generally depicted on the Land Use Map in areas which are undeveloped, used for resource production, or are developed at very low densities through Planned Unit Development, Planned Commercial Developments and Specific Plans, provided that:
a) The overall density and distribution of land uses is maintained; b) Multi-family and commercial uses are located in proximity to principal roadways, public transit, employment nodes, commercial services, and recreational uses and within 330 feet of the location depicted on the Land Use Policy Map;
c) Uses are sited to take advantage of pedestrian greenbelts, recreational amenities, and natural environmental resources; d) The availability of infrastructure to the site or adjacent service areas is not adversely impacted.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.11 Land Use and Planning
City of Bakerfield – SCH No. 2025101507 4.11-6
LAND/GEN-P-85: Encourage the revitalization of deteriorated land uses and buildings.

LAND/GEN-P-86: Encourage infill of vacant parcels.

City of Bakersfield Housing Element
The Housing Element is the City’s eight-year blueprint (2023-2031) for meeting the housing needs of the community. The Housing Element provides a coordinated strategy for preserving the City’s existing housing stock and advancing opportunities for new housing in a way that enhances quality of life and equitable access to resources. It also serves as a strategy to address housing needs across the economic and social spectrum, reflecting the needs of a diverse community.

Meeting current and projected housing needs ensures that the City can accommodate its share of the RHNA. The Housing Element identifies constraints to housing production as well as policies and actions to help overcome these constraints.

City of Bakersfield Land Use Zoning Ordinance
The City’s Zoning Ordinance is included in Title 17 of the Bakersfield Municipal Code. The Zoning Ordinance implements the goals and policies of the General Plan, which serve to promote and protect the public health, safety, peace, morals, comfort, convenience, and general welfare. The Zoning Ordinance assists in providing a definite plan of development for the City and to guide, control and regulate the future growth of the City in accordance with the General Plan. The Zoning Ordinance also is intended to protect the established character and the social and economic stability of agricultural, residential, commercial, industrial and other areas within the City, and to assure the orderly and beneficial development of such areas.

Bakersfield Municipal Code
The Project Site is zoned M-2 General Manufacturing whereby Chapter 17.30 of the BMC sets out the regulations that apply to the M-2 general manufacturing zone unless otherwise specified.

The BMC includes hierarchical rights where higher-intensity zones automatically allow lower-intensity uses. The M-2 Zone allows any uses permitted in the M-1 Zone: Section 17.28.020(A) M-1 Light Manufacturing Zone, allows uses permitted in the C-O (Professional and Administrative Office), C-1 (Neighborhood Commercial) and C-2 (Regional Commercial) zones; provided, however, that no building shall be used as a dwelling except accessory buildings which are incidental to the permitted use of the land, and that no building shall have a dwelling unit except when such use as a dwelling unit is incidental to the primary use of the building.

M-2 GENERAL MANUFACTURING ZONE

17.30.020 Uses Permitted. Any use permitted in the M-1 zone; However, no building shall be used as a dwelling except accessory buildings which are incidental to the permitted use of the land, and that no building shall have a dwelling unit except when such use as a dwelling unit is incidental to the primary use of the building.

17.30.035 Additional requirements.

A. All permitted and conditional uses pursuant to this chapter shall be subject to site plan review as provided in Chapter 17.08 of this code.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.11 Land Use and Planning
City of Bakersfield – SCH No. 2025101507 4.11-7
B. Landscaping shall be subject to the requirements of Chapter

17.61 of this code.

C. Off-street parking and loading shall be subject to the requirements of Chapter 17.58.

D. Signs shall be subject to the requirements of Chapter 17.60 of this code.

E. Industrial and/or commercial development proposed adjacent to property zoned or designated for residential development shall be required to be separated by a solid masonry wall constructed a minimum height of six feet from highest grade. Any wall located within or along the front yard area shall not exceed a height of four feet. Along street frontages, landscaping shall be required in lieu of or in combination with a solid wall, as determined by the development services director, to screen the proposed development from the residential uses.

17.30.040 Building height. Building height in an M-2 zone shall be thirteen stories and shall not exceed one hundred fifty feet.

17.30.050 Front yard. Front yard requirements in an M-2 zone shall be as follows:

A. All buildings shall be located a minimum of ten feet from the front property line.

17.30.060 Side yard. Side yard requirements in an M-2 zone shall be as follows:

A. Where the lot abuts any R, MH zone, or PUD project of a residential nature, there shall be a side yard of not less than twenty feet.

B. On a corner lot, the side yard on the street side of the lot shall be not less than ten feet.

C. In all other cases, a side yard shall not be required.

17.30.070 Rear yard. Rear yard requirements in an M-2 zone shall be as follows:

A. Where the lot abuts any R, MH zone, or PUD project of a residential nature, there shall be a rear yard of not less than twenty feet.

B. Where there is an alley at the rear of the lot, such rear yard may be measured to the center of the alley.

C. In all other cases, a rear yard shall not be required.

17.30.080 Minimum lot area. There shall be no minimum lot area in an M-2 zone.

17.30.090 Distance between buildings on the same lot. There shall be no distance requirements between buildings on the same lot in an M-2 zone.

4.11.2 Environmental Setting
The Project Site is located the northwestern portion of the City. The Project Site is an approximately 46.16-acre undeveloped L-shaped property situated along the south side of Riverview Marketplace Commercial Project
Environmental Impact Report 4.11 Land Use and Planning
City of Bakerfield – SCH No. 2025101507 4.11-8
Rosedale Highway (CA-58), north of the railroad tracks, west of Coffee Road, and east of El Toro Viejo Road. The Project Site is located on a portion of a larger property formerly occupied by the PG&E Kern Power Plant. The Project Site is currently secured on all sides by six-foot-tall chain-link fencing, with vehicular access provided via gated unpaved entry drives along Coffee Frontage Road and one concrete paved driveway along Rosedale Highway. Existing onsite features include abandoned oil wells; electrical transmission lines on metal poles, towers, and wooden poles; and several dirt roads and mounds.

Nearby uses include Rosedale Highway and a commercial retail center (Northwest Promenade), to the north; a Pacific Gas & Electric (PG&E) electric substation and vacant land to the south; El Toro Viejo Road, commercial retail, and a PG&E electric substation to the west; and Coffee Road, Friant-Kern Canal, and a commercial retail center to the east.

The General Plan land use designation of the Project Site is P (Public Facilities). The Project Site is zoned M-2 (General Manufacturing). The Project applicant is seeking an amendment to the City’s General Plan, changing the Project Site’s designation from P (Public Facilities) to LI (Light Industrial), to facilitate the Project Site’s proposed use and create alignment with the Project Site’s M-2 zoning designation, which under the City’s stacked zoning code allows, by right, all uses are permitted under the commercial designations. Therefore, to proceed with the Project and its proposed uses and to provide consistency with the Project Site’s M-2 zoning designation, the LI designation has been determined to be the appropriate land use designation.

4.11.3 Impact Analysis
Methodology
Potential impacts to land use and planning were evaluated by identifying conflicts between the proposed Project and applicable land use plans. Consistency with land use policies and regulations is determined by reviewing the relevant planning documents applicable to the Project area, including the General Plan and Zoning Ordinance. Inconsistency between a project and a land use plan does not on its own represent a significant impact to the environment unless it would result in “a substantial, or potentially substantial, adverse change in any of the physical conditions within the area affected by the project.”5
As discussed above, California’s planning law does not require a project demonstrate strict conformity with a land use plan. A project would be considered consistent with a general plan if it demonstrates that it is “compatible with the General Plan's objectives, policies, general land uses and programs.”6“The question is not whether there is a direct conflict between some mandatory provision of a general plan and some aspect of a project, but whether the project is compatible with, and does not frustrate, the general plan’s goals and policies.”7 Accordingly, a project’s consistency with a land use plan’s goals or achievement of those goals is taken into account when determining potential impacts.
5 CEQA Guidelines section 15382.
6 Napa Citizens for Honest Government v. Napa County Bd. of Supervisors (2001) (91 Cal. App. 4th 342, 378)). 7 Ibid.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.11 Land Use and Planning
City of Bakersfield – SCH No. 2025101507 4.11-9
Thresholds of Significance
The City utilizes the California Environmental Quality Act (CEQA) Guidelines, Appendix G, and thresholds of significance8to analyze the environmental impacts of the Project. Per CEQA Guidelines, an impact is considered significant if the Project would:
• Physically divide an established community.
• Cause a significant environmental impact due to a conflict with any land use plan, policy, or regulation adopted for the purpose of avoiding or mitigating an environmental effect.

Project Impacts
Threshold LUP-1 Would the project physically divide an established community? Impact Analysis
Projects that typically divide established communities are projects like new highways, roadways, bridges, and utility lines, which can create new physical obstacles between different parts of a community. The Project would redevelop an undeveloped property into an approximately 405,531 square foot commercial retail center. The Project would also include off-site improvements consisting of existing signalized intersection of Coffee Road and Jet Way. Specifically, the improvements would include the installation of a new traffic light pole/structure at the southeast corner of the Coffee Road and Jet Way intersection and any necessary roadway improvements (i.e., modification to the existing raised median to provide a dedicated left-turn lane, roadway striping). Construction and operation of the proposed Project would be limited to the boundaries of the affected parcel and the identified off-site areas and would not encroach upon the surrounding area. The immediately surrounding area is developed with other commercial uses to the north, west, and east. The Project would not include the development of new obstacles that would divide the existing community. Additionally, the Project would connect to the existing roadway system and other infrastructure and would not involve the reconfiguration of streets that could have the potential to alter the surrounding pattern of future development. Because the Project would not physically divide an established community, no impact would occur.

The Project Site is designated as P and zoned as M-2. As part of the Project, the General Plan designation would be amended to change the designation from P to LI, which both allows for the Project’s use and aligns with its existing zoning designation. The specific businesses and/or tenants that would ultimately occupy each of the buildings included in the Project are not fully known at this time. However, it is assumed that larger interior anchor buildings within the Project Site would be occupied by markets, retail uses, storage uses, and a health club, and the outer building pads would be occupied by smaller retail tenants, a medical office, drive-thrus, fast casual and sit-down restaurants, a car wash, and a gas station with 20 dual-sided pumps. As such, these uses would be consistent with the Project Site’s amended General Plan land use designation, current zoning designation, and compatible with the established land use patterns in the immediately surrounding area. Therefore, the Project would not divide an established community, and there would be no impact, with no mitigation required. 8 Association of Environmental Professionals (AEP). 2025. CEQA Guidelines Appendices, Appendix G: Environmental Checklist Form. Available at: https://www.califaep.org/docs/CEQA_Handbook_2025combined.pdf. Accessed January 2026.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.11 Land Use and Planning
City of Bakerfield – SCH No. 2025101507 4.11-10
Mitigation Measures
None required.

Level of Significance After Mitigation
No impact.

Threshold LUP-2: Would the project cause a significant environmental impact due to a conflict with any land use plan, policy, or regulation adopted for the purpose of avoiding or mitigating an environmental effect? Impact Analysis
As described above, the Project Site is surrounded by Rosedale Highway and the Northwest Promenade to the north; a PG&E electric substation and vacant land to the south; El Toro Viejo Road, commercial retail, and a PG&E electric substation to the west; and Coffee Road, Friant-Kern Canal, and a commercial retail center to the east. The Project’s proposed commercial center would be consistent with the surrounding commercial uses, as well as the amended General Plan designation and current zoning designation, thus implementing the City’s vision for the area.

General Plan
The General Plan is discussed under Section 4.11.1, Regulatory Setting, and includes goals, policies, and implementing programs to achieve the City’s development vision. The applicable goals, policies, and implementing programs were adopted for purposes of avoiding or mitigating environmental effects contained in the various General Plan elements and those that are relevant to the Project are analyzed for consistency in Table 4.11-1, General Plan Consistency. A project’s inconsistency with a policy is only considered significant if such inconsistency would cause significant physical environmental impacts.

Table 4.11-1 General Plan Consistency
General Plan Goals and Policies Project Consistency
Land Use Element
General (Goals)
Goal 1: Accommodate new development which
captures the economic demands generated by the
marketplace and establishes Bakersfield’s role as capital of the southern San Joaquin Valley.

Consistent: The Project would develop an
approximately 405,531 square foot commercial retail
center. The Project would provide for economic growth
and revenue generation to the City through creation of a flexible, market-driven development that responds to the existing and future needs and demands of the City's
commercial markets.

Goal 2: Accommodate new development which
provides a full mix of uses to support its population.

Consistent: The specific businesses and/or tenants
that would ultimately occupy each of the buildings
included in the Project’s commercial development are
not fully known. However, the development is expected
to include single and multi-tenant retail; sit down, fast casual, and drive-thru restaurants; a car wash; a health club; a medical office; a bank; public storage; a gas
station; and associated electrical and fire riser rooms.

Therefore, the Project would provide a variety of
commercial uses that would serve various visitors and
customers that would be determined by the market.

Goal 3: Accommodate new development which is
compatible with and complements existing land uses.

Consistent: As discussed above, the Project Site is
surrounded by existing commercial uses to the north,
west, and east. The Project is consistent with the
Riverview Marketplace Commercial Project
Environmental Impact Report 4.11 Land Use and Planning
City of Bakersfield – SCH No. 2025101507 4.11-11
General Plan Goals and Policies Project Consistency
amended land use designation and zoning district.

Goal 4: Accommodate new development which
channels land uses in a phased, orderly manner and is
coordinated with the provision of infrastructure.

Consistent: Project development is anticipated to be
completed in two development phases. The first phase
would consist of development of approximately 37.8
acres located at the north end of the Project, as well as associated off-site improvements. The second phase
would result in development of the remaining 8.36 acres at the south-east end of the Project. Project buildout is anticipated to occur over an approximately 20-month
timeframe, commencing in early 2026 and ending in
late-2027. Phase 1 is anticipated to commence in early
2026 and completed by late 2027, with Phase 2
commencing in early 2027 and completed by late 2027.

Additionally, Project development would include
construction of all necessary on- and off-site
infrastructure improvements to adequately serve the
Project’s water, wastewater, and drainage needs. Solid
waste and recycling generated by the Project would be
collected and hauled away by and transported
to/disposed of at the appropriate facilities. Plans for utilities and service systems that would serve the Project include provision of electricity (PG&E), natural gas
(PG&E), and telecommunications (AT&T and
Spectrum). All new utility infrastructure would be
installed underground or placed in enclosed spaces
(e.g., utility closets).

Goal 6: Accommodate new development that is sensitive
to the natural environment, and accounts for
environmental hazards.

Consistent: As discussed in Section 4.9, Hazardous
and Hazardous Materials, of this Draft EIR, the Project would result in less than significant impacts. Geologic hazards are evaluated in Section 4.7, Geology and
Soils, of this Draft EIR. In Section 4.7, it is concluded that the Project would have less than significant impacts related to geologic hazards with incorporation of
mitigation measures. Impacts to Biological Resources in Section 4.4 of the Draft EIR were determined to be less than significant with incorporation of mitigation
measures.

Goal 7: Establish a built environment which achieves a
compatible functional and visual relationship among
individual buildings and sites.

Consistent: Section 4.1, Aesthetics, of this Draft EIR
evaluates the visual impacts of the Project Site. As
discussed in Section 4.1, the Project would have a
contemporary architectural design with articulated
facades. Buildings would have a maximum height of 90
feet (60 feet below the maximum building height for the M-2 zoning district). Building materials would include
but not be limited to cement plaster with stone veneer, aluminum wood siding metal canopies, and large display
windows. Careful and judicial use of landmark buildings, as well as signage, distinctive landscape palettes, and other such elements would provide an identity and
cohesiveness to the Project Site. Along the Coffee Road Frontage and Rosedale Highway frontages would run a
“dry creek” feature composed of decorative cobbles and
decomposed granite and crushed rocks. As such, this
Draft EIR concluded that the Project would not have a
significant aesthetic impact and would be visual
compatible with the surrounding area.

Goal 8: Target growth companies that meet clean air
requirements and create sustainable employment in jobs
paying higher wages.

Consistent: As previously discussed, the Project’s
ultimate tenants would driven by the market; however,
the Project’s buildings would be constructed to promote the sustainable principles of smart growth. Compliance
with state laws regarding water and energy
Riverview Marketplace Commercial Project
Environmental Impact Report 4.11 Land Use and Planning
City of Bakerfield – SCH No. 2025101507 4.11-12
General Plan Goals and Policies Project Consistency
conservation, including Title 24, also would result in
increased efficiency and sustainability. Landscaping is anticipated to be native and drought tolerant and would comply with the Model Water Efficient Landscape
Ordinance, consistent with the City’s Municipal Code.

Commercial Development (Policies)
Policy 15: Allow for the development of a variety of
commercial centers/corridors which are differentiated by their function, intended users and level of intensity,
including convenience centers serving local residential neighborhoods, sub-regional centers which serve
groupings of neighborhoods, and major regional centers
which serve the planning area and surrounding areas.

Consistent: See the Project Consistency response to
Goal 2, above.

Policy 16: Allow for the development of a variety of
commercial uses, including those which serve residents
(groceries, clothing, etc.), highway users, and tourists-visitors.

Consistent: See the Project Consistency response to
Goal 2, above.

Policy 18: Require all new commercial designations be
assigned to sites where the aggregate of all contiguous parcels designated for commercial use is no less than five (5) acres, except for approved specific plans, parcels to be developed for highway-oriented service uses at
freeway on- and off-ramps, or where physical conditions are such that commercial is the only logical use of the property.

Consistent: The proposed Project Site is approximately

46.16 acres, which exceeds the five acre minimum.

Policy 19: Allow for the intensification and development of existing commercial areas in an infill fashion.

Consistent: The Project proposes to transform an
underutilized site into an active infill commercial center that would create economic, retail and service
opportunities in an area served with existing
infrastructure and public services.

Policy 20: The depth of new commercial developments
shall be at least half the length of the street frontage.

Exceptions may be made where existing development or
physical constraints provide a more logical shape.

Consistent: The Project would have frontages along
Coffee Road and Rosedale Highway (see Figure 7,
Street Frontage Enlargements, included in the Project
Description of this Draft EIR). The Project’s siting and setbacks are consistent Chapter 17.30, M-2 General
Manufacturing Zone, of City’s Municipal Code. The
Project Site is an L-shape parcel, which would be fully developed with the commercial development. The
Project is therefore designed to conform to the shape of the Project Site. Additionally, the Project would be
required to undergo design review by the City prior to
receiving approval.

Policy 24: Encourage the clustering of commercial
development in compact areas, rather than extended
along streets and highways.

Consistent: As discussed above, the Project consists
of an active infill commercial center on a site that is surrounded by existing commercial development to the
north, west, and east.

Policy 25: Provide for infill of commercial land uses to be compatible with the scale and character of existing
commercial districts and corridors.

Consistent: See the Project Consistency responses to
Policies 19, 20, and 24, above. The Project would have
a contemporary architectural design with articulated
facades. Buildings would have a maximum height of 90
feet (60 feet below the maximum building height for the M-2 zoning district). Building materials would include
but not be limited to cement plaster with stone veneer, aluminum wood siding metal canopies, and large display
windows. Careful and judicial use of landmark buildings, as well as signage, distinctive landscape palettes, and other such elements would provide an identity and
cohesiveness to the Project Site.

Policy 26: Encourage adjacent commercial uses to be of Consistent: See the Policy Consistency response to Policy 25. As previously discussed, the Project’s siting Riverview Marketplace Commercial Project
Environmental Impact Report 4.11 Land Use and Planning
City of Bakersfield – SCH No. 2025101507 4.11-13
General Plan Goals and Policies Project Consistency
compatible height, setback, color and materials. and setbacks are consistent Chapter 17.30, M-2 General Manufacturing Zone, of City’s Municipal Code.

Policy 28: Require that commercial development provide
design features such as screen walls, landscaping and
height, setback and lighting restrictions between the
boundaries of adjacent residential land use designations so as to reduce impacts on residences due to noise,
traffic, parking, and differences in scale.

Consistent: As previously discussed, the Project’s
siting and setbacks are consistent Chapter 17.30, M-2
General Manufacturing Zone, of City’s Municipal Code.

The Project would feature 325,120 square feet of new
landscaping along the entire site perimeter and internal to the Project Site. Landscaping would include a variety of ornamental trees, shrubs, and groundcover that
would help soften the massing of the buildings, provide for a pedestrian oriented experience and provide shade.

The Project would also include enhanced paving areas
within small plaza areas, in front of storefronts and
enhanced vehicle paving at entry points. Along the
Coffee Road Frontage and Rosedale Highway frontages
would run a “dry creek” feature composed of decorative
cobbles and decomposed granite and crushed rocks.

Lighting for the Project is intended to minimize light
trespass and glare from the Project Site onto adjacent
properties and to provide safety and nighttime visibility through shielded, focused, and directed illumination.

Lighting would consist of exterior building-mounted light fixtures; interior lighting for the new building; lighting for pedestrian walkways and common gathering areas;
lighting for the green spaces; ground-mounted
decorative lighting for landscape and architectural
features; signage lighting; lighting for the new parking areas, drive aisles, and loading dock areas; and security lighting.

The Project is anticipated to require a number of sign
types that would help identify and promote the Project
and its businesses and tenants. Sign types would
include multi-tenant pylon and monument signs, project
identification monument signs, tenant wall signs, and
onsite directional and legal signs.

Policy 30: Street frontages along all new commercial
development shall be landscaped.

A. Require new large retail commercial development
projects to evaluate decay impacts on existing
commercial uses as set forth in the implementation
measures.

B. Require perimeter street(s) around new commercial
office, retail, mixed-use, and industrial business park land uses where they will enhance pedestrian and
vehicular access from adjacent residential
neighborhoods or promote convenient access to
public transit services, and where anticipated traffic
will not detrimentally impact local streets. Exceptions may be allowed if natural or artificial barriers such as, but not limited to, railroads, utility corridors, canals or other watercourses, or topographic features exist
that create a logical separation between the uses, or
to encourage infill development.

Consistent: See the Project Consistency responses to
Policy 28, above, and Implementing Programs 18
through 21, below.

The Golden Empire Transit (GET) District is the main
transit agency servicing the City. Currently, GET
operates three bus routes: Route 61, Route 82 and
Route 84. Nearby pedestrian facilities include sidewalks along both sides of Rosedale Highway, both sides of
Coffee Road north of Jet Way and the westside of
Coffee Road south of Jet Way. Pedestrian crosswalks
are provided at signalized intersections along Rosedale Highway and Coffee Road. Existing Class II Bike Lanes
are provided in both directions along Rosedale Highway
and Coffee Road.

Pedestrian access to the Project Site would be provided via public sidewalks (10-foot-wide meandering multi-use paths) along Rosedale Highway and along Coffee Road.

Internal walkways would connect to the public sidewalks at key locations along Rosedale Highway and Coffee
Road. The internal walkways would provide access to
the various uses and areas of the Project. The internal sidewalks would also provide connectivity to the
Project’s “play area” that would consist of landscaped
mounds, benches, picnic tables, bike racks and a lawn
area. Also, striped crosswalks would be provided at key locations to allow for safe pedestrian crossing.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.11 Land Use and Planning
City of Bakerfield – SCH No. 2025101507 4.11-14
General Plan Goals and Policies Project Consistency
General (Policies)
Policy 76: Provide for a mix of land uses which meets
the diverse needs of residents; offers a variety of
employment opportunities; capitalizes, enhances, and
expands upon existing physical and economic assets;
and allows for the capture of regional growth.

Consistent: The Project would develop an
approximately 405,531 square foot commercial retail
center. The Project would provide for economic growth
and revenue generation to the City through creation of a flexible, market-driven development that responds to the existing and future needs and demands of the City's
commercial markets.

The specific businesses and/or tenants that would
ultimately occupy each of the buildings included in the Project’s commercial development are not fully known.

However, the development is expected to include single
and multi-tenant retail; sit down, fast casual, and drive-thru restaurants; a car wash; a health club; a medical office; a bank; public storage; a gas station; and
associated electrical and fire riser rooms. Therefore, the Project would provide a variety of commercial uses that would serve various visitors and customers that would
be determined by the market.

Policy 78: Accommodate new projects which are infill or expansion of existing urban development.

Consistent: As previously discussed, The Project
proposes to transform an underutilized site into an active infill commercial center that would create economic,
retail and service opportunities in an area served with existing infrastructure and public services.

Policy 79: Provide for an orderly outward expansion of
new "urban" development (any commercial, industrial,
and residential development having a density greater
than one unit per acre) so that it maintains continuity of existing development, allows for the incremental
expansion of infrastructure and public services,
minimizes impacts on natural environmental resources,
and provides a high quality environment for living and
business.

Consistent: See the Project Consistency response to
Policy 78. The Project is consistent with surrounding,
existing commercial development to the north, west, and east. The Project would be served by existing public
services at the Project Site (see Project Consistency
Response to Goal 4). As demonstrated in this Draft EIR, impacts the environment have been mitigated with
mitigation measures (MM AQ-1, MM AQ-2, MM BIO-1
through MM BIO-3, MM CUL-1, MM CUL-2, MM GHG-1 through MM GHG-7, MM GEO-1). The Project includes contemporary architectural
Policy 81: Allow for flexibility in the specific siting of multi-family residential and commercial uses from the locations generally depicted on the Land Use Map in areas which
are undeveloped, used for resource production, or are
developed at very low densities through Planned Unit
Development, Planned Commercial Developments and
Specific Plans, provided that:

A. The overall density and distribution of land uses is maintained;
B. Multi-family and commercial uses are located in
proximity to principal roadways, public transit,
employment nodes, commercial services, and
recreational uses and within 330 feet of the location
depicted on the Land Use Policy Map;
C. Uses are sited to take advantage of pedestrian
greenbelts, recreational amenities, and natural
environmental resources;
D. The availability of infrastructure to the site or
adjacent service areas is not adversely impacted.

Consistent: As previously discussed, the Project would
be consistent with siting requirements and setbacks
required for the M-2 zoning district.

Policy 85: Encourage the revitalization of deteriorated land uses and buildings.

Consistent: See the Project Consistency response to
Policy 78.

Policy 86: Encourage infill of vacant parcels. Consistent: See the Project Consistency response to Policy 78.

Implementing Programs
Riverview Marketplace Commercial Project
Environmental Impact Report 4.11 Land Use and Planning
City of Bakersfield – SCH No. 2025101507 4.11-15
General Plan Goals and Policies Project Consistency
Program 18: Require an Urban Decay Study for a retail
commercial shopping center proposed or estimated to be
over 250,000 square feet Gross Leasable Area "(GLA) in
size.

Consistent: An Urban Decay Analysis Technical
Memorandum was prepared for the Project by
PlaceWorks and dated September 19, 2025 (see
Appendix J). The Urban Decay Analysis analyzes the
retail market demand in the metropolitan Bakersfield
area to determine the potential of the Project to cause urban decay. The analysis found that the Project should not cause urban decay because there would be unmet
market demand after developing the Project, currently
and in five years. As such, the Project would not exceed expected market demand, and thus, will not directly
cause long-term vacancies in other competitive
retailers, leading to urban decay.

Program 19: Require an Urban Decay Study for a retail
store that will occupy more than 90,000 square feet Gross Leasable Area (GLA) and twenty percent (20%) or more
of the GLA is devoted to the sale of non-taxable
merchandise
Consistent: See the Project Consistency response to
Program 18.

Program 20: At time of site plan review, if an Urban
Decay Study has not yet been prepared and a project
meets or exceeds one of the thresholds listed above or
additional or new information would make preparation of a new or revised Urban Decay Study prudent, an Urban
Decay Study shalt be prepared. Phased submittal of a
PCD plan will require that assumptions regarding the total size, Gross Leasable Area, of the project at complete
build out be made to enable the City to determine the
need for an Urban Decay Study.

Consistent: See the Project Consistency response to
Program 18.

Program 21: If an Urban Decay Study has not been
submitted, the City shall require a PCD or PCD
Combining zone on all commercial projects over 20 acres in size. Retail Commercial designations within specific plan areas are exempt from the PCO requirement.

Consistent: See the Project Consistency response to
Program 18.

Source: Metropolitan Bakersfield General Plan, 2002.

In consideration of the above, the Project would be consistent with the applicable land use planning goals and policies. Therefore, any impact would be less than significant.

Mitigation Measures
None required.

Level of Significance After Mitigation
Less than significant with no mitigation required.

Cumulative Impacts
Impact Analysis
Section 3.3, Cumulative Development, identifies projects that are planned, are under construction, or are recently completed. A summary of these projects is provided in Table 3-1, Cumulative Projects List. Potential cumulative impacts would occur if the proposed Project in combination with the identified cumulative projects would result in significant effects to land use and planning.

For purposes of this analysis, the geographic scope for purposes of identifying cumulative impacts to land use and planning would be the City.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.11 Land Use and Planning
City of Bakerfield – SCH No. 2025101507 4.11-16
The Project would redevelop the Project Site with a commercial marketplace development and seek a land use designation change to LI. This land use designation change would be consistent with the Project Site’s existing zoning designation and the City’s vision for the area.

The Urban Decay Analysis Technical Memorandum, prepared by PlaceWorks and dated September 19, 2025, evaluated whether the Project, together with reasonably foreseeable pipeline retail development, could exceed market demand and cause long-term vacancies in competitive retail centers leading to urban decay. The analysis found that the Project would not not cause urban decay impacts because there would be unmet market demand after developing the Project, currently and after five years. Thus, the Project would not directly cause long-term vacancies in other competitive retail centers, leading to urban decay.

Each of the cumulative projects would be subject to CEQA and review by City regulatory agencies.

This would include a review of each project’s consistency with the General Plan, Zoning Ordinance, and other applicable requirements. Any conflicts would be mitigated or resolved through the City’s discretionary review and approval process. Impacts to land use would be less than significant. Accordingly, the proposed Project when combined with the cumulative projects, would not have any cumulatively considerable impacts on land use and planning.

Mitigation Measures
None required.

Level of Significance After Mitigation
The Project would result in less than significant cumulative impacts to land use and planning. No mitigation is required.

City of Bakersfield – SCH No. 2025101507 4.12-1

4.12 Mineral Resources
This section discusses potential impacts to mineral resources that may result from the proposed Riverview Marketplace Commercial Project (Project). Potential effects are evaluated based on the Project’s potential to result in the loss of availability of a known mineral resource that would be of value to the region and the residents of the State; and the potential to result in the loss of availability of a locally important mineral resource recovery site delineated on a local general plan, specific plan, or other land use plan. Information in this section is based, in part, on the Metropolitan Bakersfield General Plan Update (General Plan) and its Environmental Impact Report (General Plan EIR), a Phase I Environmental Site Assessment (Phase I ESA) prepared for the Project by Rincon Consultants (Rincon) and dated August 21, 2025, and an Engineering Review of Plugged & Abandoned Oil & Gas Wellbores “REID-KCL” #1 and #3 (Well Engineering Report), prepared by Petrotech Resources Company, Inc. (Petrotech) and dated March 1, 2026 both reports are included in Appendix F, Hazards and Hazardous Materials Supporting Information, of this Draft Environmental Impact Report (EIR).

During the scoping period for the Project’s EIR, no comments were received in response to the Notice of Preparation (NOP).

4.12.1 Regulatory Setting
State
Surface Mining and Reclamation Act
The Surface Mining and Reclamation Act (SMARA) of 1975 (California Public Resources Code [PRC] §§ 2710-2796) required the California State Mining and Geology Board to classify California mineral resources with the Mineral Resource Zones (MRZs) system. These zones have been established based on the presence or absence of significant sand and gravel deposits and crushed rock and stone sources (e.g., products used in the production of cement). The MRZ categories are defined as follows:
• MRZ-1: Areas where available geologic information indicates there is little likelihood for the presence of significant mineral resources.
• MRZ-2a: Areas underlain by mineral deposits where geologic data indicate that significant measured or indicated resources are present. As shown on the California Mineral Land Classification Diagram, MRZ-2 is divided on the basis of both degree of knowledge and economic factors. Areas classified MRZ-2a contain discovered mineral deposits that are either measured or indicated reserves as determined by such evidence as drilling records, sample analysis, surface exposure, and mine information.

Land included in the MRZ-2a category is of prime importance because it contains known economic mineral deposits.
• MRZ-2b: Areas underlain by mineral deposits where geologic information indicates that significant inferred resources are present. Areas classified MRZ-2b contain discovered mineral deposits that are either inferred reserves as determined by limited sample analysis, exposure, and past mining history or are deposits that presently are sub-economic. Further exploration work and/or changes in technology or economics could result in upgrading areas classified MRZ-2b to MRZ-2a.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.12 Mineral Resources
City of Bakersfield – SCH No. 2025101507 4.12-2
• MRZ-3a: Areas containing known mineral occurrences of undetermined mineral resource significance. Further exploration work within these areas could result in the reclassification of specific localities into MRZ-2a or MRZ-2b categories. As shown on the California Mineral Land Classification Diagram, MRZ-3 is divided on the basis of knowledge of economic characteristics of the resources. • MRZ-3b: Areas containing inferred mineral occurrences of undetermined mineral resource significance. Land classified MRZ-3b represents areas in geologic settings that appear to be favorable environments for the occurrence of specific mineral deposits. Further exploration work could result in the reclassification of all or part of these areas into the MRZ-3a category or specific localities into MRZ-2a or MRZ-2b categories.
• MRZ-4: Areas of no known mineral occurrences where geologic information does not rule out either the presence or absence of significant mineral resources.

Department of Conservation, California Geologic Energy Management Division The California Geologic Energy Management Division (CalGEM) is a subdivision of the California Department of Conservation (DOC). CalGEM, formerly the Division of Oil, Gas, and Geothermal Resources, oversees the drilling, operation, maintenance, and plugging and abandonment of oil, natural gas, and geothermal energy wells. CalGEM functions as an information repository but also regulates oil and gas extraction activities consistent with state regulations, which include Section 3000 et seq. of the State Public Resources Code and Title 14, Division 2, Chapter 4 of the California Code of Regulations. CalGEM maintains Well Finder, an online mapping application that depicts California’s oil and gas industry information. CalGEM regularly updates oil well locations and status, oil field boundaries, lease boundaries, and district boundaries.

Local
City of Bakersfield General Plan Update
The City of Bakersfield (City’s) General Plan, Metropolitan Bakersfield General Plan dated December 2002, was updated in January 2016 per Resolution No. 018-16 and 019-16. At the time this EIR was published for public review, the City was in the process of updating its Bakersfield 2045 General Plan, but it has not yet been adopted. The General Plan includes goals, policies, and directions to achieve the City’s vision of the community and future development. The General Plan includes 12 elements that focus on: Land Use; Circulation; Open Space; Housing; Conservation; Noise; Safety; Downtown Redevelopment; Public Services Facilities; Parks; Kern River Plan; and Historical Resources.

The General Plan established the following goals and policies in order to protect the City’s mineral resources:

Conservation Element
CON/MR-G-1 Protect areas of significant resource potential for future use.

CON/MR-G-2 Document areas of current mineral and energy resource extraction, as a basis for land use and conservation policies and programs.

CON/MR-G-3 Avoid conflicts between the productive use of mineral and energy resource lands and urban growth.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.12 Mineral Resources
City of Bakersfield – SCH No. 2025101507 4.12-3
CON/MR-G-4 Protect land, water, air quality and visual resources from environmental damage resulting from mineral and energy resource development.

CON/MR-P-1 Maintain maps and descriptions of potential mineral and energy resources as a basis for policy and program implementation.

CON/MR-P-2 Document the location, status, and long-term viability of sand and gravel quarries and petroleum drilling sites for purposes of avoiding near and long-term land use conflicts and provide a basis for compliance monitoring.

CON/MR-P-4 Land use decisions shall recognize the importance of identified mineral resources and need for conservation of resources identified by the State Mining and Geology Board.

CON/MR-P-5 Protect significant mineral and petroleum resource areas, including potential sand and gravel extraction areas.

CON/MR-P-7 Promote development of compatible uses adjacent to mineral extraction areas.

CON/MR-P-8 Allow development of resource extraction sites subject to the conditional use permit procedure in zones where such uses are not permitted by right and where it can be shown that proposed extraction uses are compatible with surrounding uses.

CON/MR-P-9 Encourage preservation of any known deposits of gemstones and fossils.

CON/MR-P-10 Implement, as appropriate, the California Environmental Quality Act to minimize land use conflicts and reduce environmental impacts of all proposed resource extraction operations.

CON/MR-P-11 Prohibit incompatible development in areas which have a significant potential for harm to public health, safety and welfare due to mineral and petroleum extraction and processing.

CON/MR-P-13 Require surface mineral resource extraction sites to have plans and procedures for land reclamation; pursuant to the Surface Mining and Reclamation Act of 1975 (Public Resource Code Section 2710 et seq.) and conforming with the requirements of the State Mining and Geology Board Reclamation Regulations, to be implemented upon completion of extraction operations at each site or portion thereof.

CON/MR-P-14 Review all discretionary mineral or petroleum development including renewal of existing authorizations, under the policies and procedures of the California Environmental Quality Act.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.12 Mineral Resources
City of Bakersfield – SCH No. 2025101507 4.12-4
CON/MR-P-16 Require all mineral development to be predicated on appropriate reclamation plans that meet the standards of the State Surface Mining and Reclamation Act and the implementing guidelines of the State Mines and Geology Board, and (or) the standards of the State Division of Oil and Gas. Reclamation/restoration of the sites shall be done as each phase of development or extraction is completed.

4.12.2 Environmental Setting
As described in Chapter 2, Project Description, the Project Site is located in the northwestern portion of the City on an approximately 46.16-acre, undeveloped site, situated along the south side of Rosedale Highway, north of railroad tracks, west of Coffee Road, and east of El Toro Viejo Road. The Project Site is located on a portion of a larger property formerly occupied by the PG&E Kern Power Plant. Existing on-site features include abandoned oil wells; electrical transmission lines on metal poles, towers, and wooden poles; and several dirt roads and mounds.

Development of the Project Site would include construction and operation of a commercial retail center that would encompass approximately 405,531 square feet of total building space. The General Plan designates the Project Site as P (Public Facilities), and the Zoning Ordinance zones the Project Site as M-2 (General Manufacturing). The Project would include a General Plan Amendment (GPA) to the City’s General Plan, changing the Project Site’s designation from P (Public Facilities) to LI (Light Industrial), to facilitate the Project Site’s proposed use and create alignment with the Project Site’s M-2 zoning designation, which under the City’s stacked zoning code allows, by right, all uses permitted in M-1 (Light Manufacturing), C-O (Professional and Administrative Offices), C-1 (Neighborhood Commercial) and C-2 (Regional Commercial) zone.

Therefore, the LI designation has been determined to be the appropriate land use designation.

The principal mineral resources under development in the City are oil, natural gas, sand and gravel. The region is a major oil-producing area, with substantial oil and gas fields existing within the City boundaries. According to the General Plan, sand and gravel areas within the City are concentrated primarily along the floodplain and alluvial fan of the Kern River, where clean, coarse deposits have been left by major floods over the past several thousand years. Sand and gravel are an important resource for construction, development, and physical maintenance in the City.

The California Department of Conservation Division of Mine Reclamation does not indicate that any active mining operations are located on or near the Project Site.1 Additionally, the Mineral Resource Zone (MRZ) classification areas in the City are shown in the California Geological Survey’s mineral resources map, “Updated Mineral Land Classification Map for Portland Cement Concrete-Grade Aggregate in the Bakersfield Production-Consumption Region, Kern County, California.”2 The Project Site falls within the MRZ-3 zone, which indicates areas containing mineral deposits the significance of which cannot be evaluated from available data.

Oil production activities within the City have been historically concentrated in the outskirts of the City’s developed area. As noted above, the Project Site is within the Fruitvale Oil Field, however, the Fruitvale Oil Field has been depleted to a state of being under-pressured and is incapable of flowing liquid to the surface and is no longer active.
1 California Department of Conservation (DOC). 2016. Division of Mine Reclamation, Mines Online. Available at:
https://maps.conservation.ca.gov/mol/index.html. Accessed January 2026. 2 California DOC. 2009. California Geological Survey. Updated Mineral Land Classification Map for Portland Cement Concrete-Grade Aggregate in the Bakersfield Production-Consumption Region, Kern County, California. Available at:
https://filerequest.conservation.ca.gov/?q=SR_210. Accessed January 2026.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.12 Mineral Resources
City of Bakersfield – SCH No. 2025101507 4.12-5
Five “plugged” oil and gas production wells, two “plugged” oil and gas production wells, one “plugged” waterflood well, and three “abandoned/removed tanks” are mapped as located on the Project Site. According to the Phase I ESA prepared for the Project (Appendix F), the oil wells were plugged and abandoned to current CalGEM standards. As noted in the Well Engineering Report, the original existing plugging and abandonment of both wells was approved by CalGEM’s predecessor at the time as adequately meeting the requirement for protecting all subsurface strata, ground water, and the surface.

4.12.3 Impact Analysis
Methodology
The effects of the proposed project on mineral resources were assessed qualitatively. The analysis included identifying mineral resources employing maps and databases made available to the public by the State and assessing the potential effects of the proposed Project on these resources. Sources employed include the California Geologic Energy Management Division (CalGEM) Well Finder and the California Geological Survey’s mineral resources map, “Updated Mineral Land Classification Map for Portland Cement Concrete-Grade Aggregate in the Bakersfield Production-Consumption Region, Kern County, California.” Thresholds of Significance
The City utilizes the California Environmental Quality Act (CEQA) Guidelines, Appendix G, and thresholds of significance3to analyze the environmental impacts of the Project. Per CEQA Guidelines, an impact is considered significant if the Project would:
• Result in the loss of availability of a known mineral resource that would be a value to the region and the residents of the state.
• Result in the loss of availability of a locally important mineral resource recovery site delineated on a local general plan, specific plan or other land use plan? Project Impacts
Threshold MIN-1: Would the project result in the loss of availability of a known mineral resource that would be a value to the region and the residents of the state?
Impact Analysis
As discussed in Section 3.12.2, Environmental Setting, the DOC’s Mines Online mapping application indicates that there are no mineral mines located on or near the Project Site. The California Geological Survey’s mineral map indicates that the Project Site falls within the MRZ-3 zone, which indicates areas containing mineral deposits the significance of which are unknown.

The most recent mineral resources map for the Project Site was published in 2009 and did not further delineate this zone into (a) or (b). However, there are no established current economic operations for concrete aggregate extraction within or near the Project Site.

As noted in the Engineering Review of Plugged & Abandoned Oil & Gas Wellbores RED KCL #1 and #3, (Appendix F-2), like most fields located in this area of Kern County, the Fruitvale Oil Field 3 Association of Environmental Professionals (AEP). 2025. CEQA Guidelines Appendices, Appendix G: Environmental Checklist Form. Available at: https://www.califaep.org/docs/CEQA_Handbook_2025combined.pdf. Accessed January 2026.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.12 Mineral Resources
City of Bakersfield – SCH No. 2025101507 4.12-6
has been depleted to a state of being under-pressured and is incapable of flowing liquid to the surface
Five “plugged” oil and gas production wells, two “plugged” oil and gas production wells, one “plugged” waterflood well, and three “abandoned/removed tanks” are mapped as located on the Project Site. According to the Phase I ESA (Appendix F-1), the oil wells were plugged and abandoned to current CalGEM standards. Based on the California DOC’s Well Finder map, the Project site is within the Fruitvale oil/gas field. Five “plugged” oil and gas production wells, two “plugged” oil and gas production wells, one “plugged” waterflood well, and three “abandoned/removed tanks” are mapped as located on the Project Site. According to the Phase I ESA, the oil wells were plugged and abandoned to current CalGEM standards. Additionally, as noted in the Well Engineering Report, the original existing plugging and abandonment of both wells was approved by CalGEM’s predecessor at the time as adequately meeting the requirement for protecting all subsurface strata, ground water, and the surface. The Phase I ESA concludes that there is no evidence of any petroleum products still existing within the Project site. Therefore, no known mineral resource is located on the Project Site. Moreover, the Project does not propose operations that would encroach upon existing oil operations. Accordingly, the Project would have less than significant impacts related to the loss of a known mineral resource, and no mitigation is required.

Mitigation Measures
None required.

Level of Significance After Mitigation
Less than significant with no mitigation required.

Threshold MIN-2: Would the project result in the loss of availability of a locally important mineral resource recovery site delineated on a local general plan, specific plan or other land use plan?
Impact Analysis
As discussed above, the Project Site does not serve as an active mining site, nor is there any mining activity in the Project vicinity. Additionally, as discussed above, all wells located on site have been permanently plugged and abandoned. The Project Site is designated by the General Plan as P and would require a GPA to change the land use designation to LI, which has been determined to be consistent with the proposed uses included in the Project. As such, the Project Site is not designated as Mineral and Petroleum (R-MP), which is a land use designation utilized for areas which contain producing, or potentially productive, petroleum fields and mineral deposits. Therefore, the Project would not result in the loss of availability of a locally important mineral resource recovery site and there would be less than significant impacts. No mitigation is required.

Mitigation Measures
None required.

Level of Significance After Mitigation
Less than significant with no mitigation required.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.12 Mineral Resources
City of Bakersfield – SCH No. 2025101507 4.12-7
Cumulative Impacts
As previously discussed, the Project site does not contain any active mining or mineral extraction operations and all wells on site have been permanently sealed and abandoned. The Project Site and its surrounding vicinity falls within the MRZ-3 zone, where there is not enough available geologic information to determine the presence of significant mineral resources. While the Project Site is located within the Fruitvale oil/gas field and active oil and gas wells are located directly west and south of the Project, implementation of the Project would not impact the operation of these wells. All other cumulative projects proposed within the vicinity of the Project would be required to analyze the project-specific impacts to any mining, mineral extraction, and wells in the vicinity of the Project Site and mitigate any potential impacts accordingly. Therefore, the Project in combination with cumulative impacts would have a less than significant cumulative impact. As such, no mitigation is required. Accordingly, neither the proposed Project nor the cumulative projects would have impacts, including cumulative impacts, associated with mineral resources.

Mitigation Measures
No mitigation measures are required as the Project would have less than significant impacts to mineral resources.

Level of Significance After Mitigation
There would be no Project-specific or cumulative significant impacts related to mineral resources and no mitigation is required.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.12 Mineral Resources
City of Bakersfield – SCH No. 2025101507 4.12-8
This page intentionally left blank.

City of Bakersfield – SCH No. 2025101507 4.13-1

4.13 Noise
This section of the Draft EIR addresses potential noise and vibration impacts associated with the Project. This discussion includes information regarding noise fundamentals, regulatory setting, the existing noise environment, the noise analysis methodology, and the potential Project-related noise and vibration impacts. A noise study, dated April 2026, was prepared by Placeworks for the Project and is included as Appendix G, Noise and Vibration Technical Study.

4.13.1 Noise Fundamentals
Noise is most often defined as unwanted sound. Although sound can be easily measured, the perception of noise and the physical response to sound complicate the analysis of its impact on people. People judge the relative magnitude of sound sensation in subjective terms such as “noisiness” or “loudness.”
The following are brief definitions of terminology:
• Sound. A disturbance created by a vibrating object, which, when transmitted by pressure waves through a medium such as air, is capable of being detected by a receiving mechanism, such as the human ear or a microphone.
• Noise. Sound that is loud, unpleasant, unexpected, or otherwise undesirable. • Decibel (dB). A unitless measure of sound, expressed on a logarithmic scale and with respect to a defined reference sound pressure. The standard reference pressure is 20 micropascals (20 µPa).
• Vibration Decibel (VdB). A unitless measure of vibration, expressed on a logarithmic scale and with respect to a defined reference vibration velocity. In the U.S., the standard reference velocity is 1 micro-inch per second (1x10-6 in/sec). • A-Weighted Decibel (dBA). An overall frequency-weighted sound level in decibels that approximates the frequency response of the human ear.
• Equivalent Continuous Noise Level (Leq); also called the Energy-Equivalent Noise Level.

The value of an equivalent, steady sound level which, in a stated time period (often over an hour) and at a stated location, has the same A-weighted sound energy as the time-varying sound. Thus, the Leq metric is a single numerical value that represents the equivalent amount of variable sound energy received by a receptor over the specified duration.
• Statistical Sound Level (Ln). The sound level that is exceeded “n” percent of the time during a given sample period. For example, the L50 level is the statistical indicator of the time-varying noise signal that is exceeded 50 percent of the time (during each sampling period); that is, half of the sampling time, the changing noise levels are above this value and half of the time they are below it. This is called the “median sound level.” The L10 level, likewise, is the value that is exceeded 10 percent of the time (i.e., near the maximum) and this is often known as the “intrusive sound level.” The L90 is the sound level exceeded 90 percent of the time and is often considered the “effective background level” or “residual noise level.”
• Maximum Sound Level (Lmax). The highest RMS sound level measured during the measurement period.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.13 Noise
City of Bakersfield – SCH No. 2025101507 4.13-2
• Root Mean Square Sound Level (RMS). The square root of the average of the square of the sound pressure over the measurement period.
• Day-Night Sound Level (Ldn or DNL). The energy-average of the A-weighted sound levels occurring during a 24-hour period, with 10 dB added to the sound levels occurring during the period from 10:00 PM to 7:00 AM.
• Community Noise Equivalent Level (CNEL). The energy average of the A-weighted sound levels occurring during a 24-hour period, with 5 dB added from 7:00 PM to 10:00 PM and 10 dB from 10:00 PM to 7:00 AM. NOTE: For general community/environmental noise, CNEL and Ldn values rarely differ by more than 1 dB (with the CNEL being only slightly more restrictive – that is, higher than the Ldn value). As a matter of practice, Ldn and CNEL values are interchangeable and are treated as equivalent in this assessment. • Peak Particle Velocity (PPV). The peak rate of speed at which soil particles move (e.g., inches per second) due to ground vibration.
• Sensitive Receptor. Noise- and vibration-sensitive receptors include land uses where quiet environments are necessary for enjoyment and public health and safety. Residences, schools, motels and hotels, libraries, religious institutions, hospitals, and nursing homes are examples.

Characteristics of Sound
When an object vibrates, it radiates part of its energy in the form of a pressure wave. Sound is that pressure wave transmitted through the air. Technically, airborne sound is a rapid fluctuation or oscillation of air pressure above and below atmospheric pressure that creates sound waves.

Sound can be described in terms of amplitude (loudness), frequency (pitch), or duration (time).

Loudness or amplitude is measured in dB, frequency or pitch is measured in Hertz [Hz] or cycles per second, and duration or time variations is measured in seconds or minutes.

Amplitude
Unlike linear units such as inches or pounds, decibels are measured on a logarithmic scale.

Because of the physical characteristics of noise transmission and perception, the relative loudness of sound does not closely match the actual amounts of sound energy. Table 2, Noise Perceptibility, presents the subjective effect of changes in sound pressure levels. Ambient sounds generally range from 30 dBA (very quiet) to 100 dBA (very loud). Changes of 1 to 3 dBA are detectable under quiet, controlled conditions, and changes of less than 1 dBA are usually not discernible (even under ideal conditions). A 3 dBA change in noise levels is considered the minimum change that is detectable with human hearing in outside environments. A change of 5 dBA is readily discernible to most people in an exterior environment, and a 10 dBA change is perceived as a doubling (or halving) of the sound.

Frequency
The human ear is not equally sensitive to all frequencies. Sound waves below 16 Hz are not heard at all but are “felt” more as a vibration (predominantly in a person’s chest cavity). Similarly, though people with extremely sensitive hearing can hear sounds as high as 20,000 Hz, most people cannot hear above 15,000 Hz. In all cases, hearing acuity falls off rapidly above about 10,000 Hz and below about 200 Hz.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.13 Noise
City of Bakersfield – SCH No. 2025101507 4.13-3
When describing sound and its effect on a human population, A-weighted (dBA) sound levels are typically used to approximate the response of the human ear. The A-weighted noise level has been found to correlate well with people’s judgments of the “noisiness” of different sounds and has been used for many years as a measure of community and industrial noise.

Duration
Time variation in noise exposure is typically expressed in terms of a steady-state energy level equal to the energy content of the time-varying period (called Leq), or alternately, as a statistical description of the sound level that is exceeded over some fraction of a given observation period.

For example, the L50 noise level represents the noise level that is exceeded 50 percent of the time—half the time the noise level is higher than this level and half the time the noise level is lower—or exceeded for 30 minutes in an hour. Similarly, the L2, L8 and L25 values represent the noise levels that are exceeded 2, 8, and 25 percent of the time or 1, 5, and 15 minutes per hour, respectively. These “n” values are typically used to demonstrate compliance with cities’ noise ordinances for stationary noise sources. Other values typically noted during a noise survey are the Lmin and Lmax. These values represent the minimum and maximum root-mean-square noise levels obtained over the measurement period, respectively.

Because community receptors are more sensitive to unwanted noise intrusion during the evening and at night, state law and many local jurisdictions use an adjusted 24-hour noise descriptor called the Community Noise Equivalent Level (CNEL) or Day-Night Noise Level (Ldn). The CNEL descriptor requires that an artificial increment (or “penalty”) of 5 dBA be added to the actual noise level for the hours from 7:00 pm to 10:00 pm and 10 dBA for the hours from 10:00 pm to 7:00 am.

The Ldn descriptor uses the same methodology except that there is no artificial increment added to the hours between 7:00 pm and 10:00 pm. Both descriptors give roughly the same 24-hour level, but the CNEL is slightly higher and therefore more restrictive. The CNEL or Ldn metrics are commonly applied to the assessment of roadway- and airport-related noise sources.

Sound Propagation
Sound dissipates exponentially with distance from the noise source. This phenomenon is known as “spreading loss.” For a single-point source, sound levels decrease by approximately 6 dBA for each doubling of distance from the source (conservatively neglecting ground attenuation effects, air absorption factors, and barrier shielding).

For example, if a backhoe at 50 feet generates 84 dBA, at 100 feet the noise level would be 78 dBA, and at 200 feet it would be 72 dBA. This drop-off rate is appropriate for noise generated by on-site operations from stationary equipment or activity at a project site. If noise is produced by a line source, such as highway traffic, the sound decreases by 3 dBA for each doubling of distance over a reflective (“hard site”) surface such as concrete or asphalt. Line source noise in a relatively flat environment with ground-level absorptive vegetation decreases by an additional

1.5 dBA for each doubling of distance.

Psychological and Physiological Effects of Noise
Physical damage to human hearing begins at prolonged exposure to noise levels higher than 85 dBA. Exposure to high noise levels affects the entire system, with prolonged noise exposure in excess of 75 dBA increasing body tensions, which affects blood pressure and functions of the heart and the nervous system. Extended periods of noise exposure above 90 dBA result in permanent cell damage, which is the main driver for employee hearing protection regulations in the workplace. For community environments, the ambient or background noise problem is Riverview Marketplace Commercial Project
Environmental Impact Report 4.13 Noise
City of Bakersfield – SCH No. 2025101507 4.13-4
widespread, though generally worse in urban areas than in outlying, less-developed areas.

Elevated ambient noise levels can result in noise interference (e.g., speech interruption/masking, sleep disturbance, disturbance of concentration) and cause annoyance. Although the A-weighted scale and the energy-equivalent metric are commonly used to quantify the range of human response to individual events or general community sound levels, the degree of annoyance or other response also depends on several other perceptibility factors, including:
• Ambient (background) sound level
• General nature of the existing conditions (e.g., quiet rural or busy urban) • Difference between the magnitude of the sound event level and the ambient condition • Duration of the sound event
• Number of event occurrences and their repetitiveness
• Time of day that the event occurs
Since most people do not routinely work with decibels or A-weighted sound levels, it is often difficult to appreciate what a given sound pressure level number means. To help relate noise level values to common experience, Table 4.13-1, Typical Noise Levels, shows typical noise levels from familiar sources.

Table 4.13-1 Typical Noise Levels
Common Outdoor Activities
Noise Level
(dBA) Common Indoor Activities
110 Rock Band
Jet Flyover at 1,000 feet
100
Gas Lawn Mower at three feet
90 Diesel Truck at 50 feet, at 50 mph Food Blender at 3 feet 80 Garbage Disposal at 3 feet
Noisy Urban Area, Daytime
70 Vacuum Cleaner at 10 feet
Commercial Area Normal speech at 3 feet
Heavy Traffic at 300 feet 60
Large Business Office
Quiet Urban Daytime 50 Dishwasher Next Room
Quiet Urban Nighttime 40 Theater, Large Conference Room (background)
Quiet Suburban Nighttime
30 Library
Quiet Rural Nighttime Bedroom at Night, Concert Hall (background) 20 Very Remote & Unpopulated Area
Nighttime
Broadcast/Recording Studio
10 Lowest Threshold of Human Hearing 0 Lowest Threshold of Human Hearing Source: Caltrans 2013.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.13 Noise
City of Bakersfield – SCH No. 2025101507 4.13-5
Characteristics of Vibration
Vibration is an oscillatory motion through a solid medium in which the motion’s amplitude can be described in terms of displacement, velocity, or acceleration. Vibration is normally associated with activities stemming from operations of railroads or vibration-intensive stationary sources but can also be associated with construction equipment such as jackhammers, pile drivers, and hydraulic hammers. As with noise, vibration can be described by both its amplitude and frequency. Vibration displacement is the distance that a point on a surface moves away from its original static position; velocity is the instantaneous speed that a point on a surface moves; and acceleration is the rate of change of the speed. Each of these descriptors can be used to correlate vibration to human response, building damage, and acceptable equipment vibration levels. During construction, the operation of construction equipment can cause groundborne vibration. During the operational phase of a project, receptors may be subject to levels of vibration that can cause annoyance due to noise generated from the vibration of a structure or items within a structure.

Vibration amplitudes are usually described in terms of either the peak particle velocity (PPV) or the root mean square (RMS) velocity. PPV is the maximum instantaneous peak of the vibration signal, and RMS is the square root of the average of the squared amplitude of the signal. PPV is more appropriate for evaluating potential building damage, and RMS is typically more suitable for evaluating human response.

As with airborne sound, annoyance with vibrational energy is a subjective measure that depends on the level of activity and the sensitivity of the individual. To sensitive individuals, vibrations approaching the threshold of perception can be annoying. People accustomed to elevated ambient vibration levels, such as in an urban environment, may tolerate higher vibration levels.

Table 4.13-2, Human Reaction to Typical Vibration Levels, displays the human response and the effects on buildings resulting from continuous vibration (in terms of PPV).

Table 4.13-2 Human Reaction to Typical Vibration Levels Vibration Level,
PPV (in/sec) Human Reaction Effect on Buildings

0.006–0.019 Threshold of perception, possibility of
intrusion
Vibrations unlikely to cause damage of any
type

0.08 Vibrations readily perceptible
Recommended upper level of vibration to
which ruins and ancient monuments should
be subjected

0.10 Level at which continuous vibration
begins to annoy people
Virtually no risk of “architectural” (i.e., not
structural) damage to normal buildings

0.20 Vibrations annoying to people in buildings
Threshold at which there is a risk to
“architectural” damage to normal dwelling –
houses with plastered walls and ceilings

0.4–0.6
Vibrations considered unpleasant by
people subjected to continuous vibrations
and unacceptable to some people walking
on bridges
Vibrations at a greater level than normally
expected from traffic, but would cause
“architectural” damage and possibly minor
structural damage
Source: Caltrans 2020.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.13 Noise
City of Bakersfield – SCH No. 2025101507 4.13-6

4.13.2 Regulatory Setting
State
California Building Code
The California Green Building Standards Code (CALGreen) has requirements for insulation that affect exterior-to-interior noise transmission for non-residential structures. Pursuant to CALGreen Section 5.507.4.1, Exterior Noise Transmission, an architectural acoustics study may be required when a project site is in a 65 dBA CNEL or Ldn noise contour of an airport, freeway or expressway, railroad, industrial source, or fixed-guideway source. Where noise contours are not readily available, if buildings are exposed to a noise level of 65 dBA Leq during any hour of operation, specific wall and ceiling assembly and sound-rated windows may be necessary to reduce interior noise to acceptable levels.

Local
City of Bakersfield General Plan
The City’s General Plan Noise Element includes an assessment of the existing community noise environment, including surveys of residents, and an action plan for achieving goals for the future noise environment in the City. The noise element aims to protect the health and well-being of the City’s residents by establishing and preserving quiet environments. Goals and policies from the noise element that are applicable to the Project are:
• Goal: Ensure that residents of the Bakersfield Metropolitan Area are protected from excessive noise and existing moderate levels of noise are maintained. • Goal: Protect the citizens of the planning area from the harmful effects of exposure to excessive noise and protect the economic base of the area by preventing the encroachment of incompatible land uses near known noise-producing roadways, industries, railroads, airports, and other sources.
• Policy. Review discretionary industrial, commercial, or other noise generating land use projects for compatibility with nearby noise-sensitive land uses. Additionally, the development of new noise generating land uses which are not preempted from local regulation will be reviewed if resulting noise levels will exceed the performance standards contained within Table VII-2 in areas containing residential or other noise-sensitive land uses.
• Policy. Require noise level criteria applied to land uses other than residential or other noise-sensitive uses to be consistent with the recommendations of the California Office of Noise Control.
• Policy. Establish threshold standards for the determination of the existence of cumulative noise impacts that are significant and will therefore require mitigation to achieve acceptable noise standards that do not exceed the standards contained in this element.

In addition to goals and policies, the noise element includes the following applicable implementations.
• Implementation 2. Review discretionary development plans, programs, and proposals, including those initiated by both the public and private sectors, to ascertain and ensure their conformance to the policy framework outlined in this element.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.13 Noise
City of Bakersfield – SCH No. 2025101507 4.13-7
• Implementation 4. Require proposed commercial and industrial uses or operations to be designed or arranged so that they will not subject residential or other noise sensitive land uses to exterior noise levels in excess of 65 dB(A) CNEL and interior noise levels in excess of 45 dB(A) CNEL and so that impacts on noise sensitive uses shall not exceed the performance in standards in Table VII-2 (Table 5 in this study). • Implementation 10. Standards for Project Noise Impacts for Mobile Sources. A significant increase of existing ambient noise levels affecting existing noise sensitive land uses, and requiring the adaptation of practical and feasible mitigation measures, is deemed to occur where a project will cause:
▪ An increase of the existing ambient noise levels by 5 dB(A) or more, where the existing ambient level is less than 60 dB(A) CNEL.
▪ An increase of the existing ambient noise level by 3 dB(A) or more, where the existing ambient level is 60 dB(A) to 65 dB(A) CNEL.
▪ An increase of the existing ambient noise level by 1.5 dB(A) or more, where the existing ambient level is greater than 65 dB(A) CNEL.

Standards for Cumulative Noise Impacts for Mobile Sources. A project’s contribution to noise increase would normally be considered cumulatively considerable and considered significant when ambient noise levels affect noise sensitive land uses (receptors) and when the following occurs.
• A project increases the ambient (cumulative without project) noise level by 1 dB(A) or more; and,
• The cumulative with project noise levels cause the following:
▪ An increase of the existing ambient noise level by 5 dB(A) or more, where the existing ambient level is less than 60 dB(A) CNEL.
▪ An increase of the existing ambient noise level by 3 dB(A) or more, where the existing ambient level is 60 to 65 dB(A) CNEL
▪ An increase on the existing ambient noise level by 1.5 dB or more, where the existing ambient level is greater than 65 dB(A) CNEL.

The Bakersfield General Plan provides regulations to control unnecessary, excessive, and annoying noise and vibration in the City. Exterior noise limits based on noise-sensitive land uses are shown in Table 4.13-3, Exterior Stationary Noise Standards.

Table 4.13-3 Exterior Stationary Noise Standards
Category
Cumulative number of
minutes in any one-hour
period
Daytime 7:00 am to 10:00 pm Nighttime 10:00 pm to 7:00
am
1 30 (L50) 55 50
2 15 (L25) 60 55
3 5 (L8.3) 65 60
4 1 (L1.7) 70 65
5 0 (Lmax) 75 70
Source: Bakersfield 2002, Table VII-2.

Note: Each of the noise level standards specified in this table shall be reduced by five (5) dB(A) for pure tone noises, noises consisting primarily of speech or music, or for recurring impulsive noises. These noise level standards should be applied at a residential or other noise-sensitive land use and not on the property of a noise-generating land use.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.13 Noise
City of Bakersfield – SCH No. 2025101507 4.13-8
City of Bakersfield Municipal Code
Construction Noise
Under Section 9.22.050, Noise during construction, of the Bakersfield Municipal Code, the City prohibits construction activities from 9:00 p.m. to 6:00 a.m. Monday through Friday (including federal holidays), and before 8:00 a.m. or after 9:00 p.m. on weekends that produce loud or unusual noise which annoys or disturbs a reasonable person of normal sensitivity.

Design Standards for Retail Developments
Noise standards for retail developments is under Section 17.08.140(I), Delivery/Loading and Solid Waste Operations for Projects Exceeding Fifty Thousand Square Feet of Gross Floor Area and/or Five Acres of Buildable Area. Under Section 17.08.140(I)(2), in addition to compliance with the noise level performance standards table in the noise element of the Metropolitan General Plan for daytime/nighttime exterior noise levels, other than trash removal by the City or its contractors, all loading, unloading, delivery, private refuse collection and related operations shall not be permitted between the hours of 10:00 p.m. and 7:00 a.m. adjacent to any land zoned or developed with residential uses. These activities may occur if the developer submits evidence to the City that sound mitigation will reduce the noise generated by such operations to less than 3 dBA above the measured background noise level at the same period for any three continuous minutes in any hour during the operation as measured at the property line adjacent to said residential lands.

Under Section 17.08.140(I)(3), loading docks shall include separate walls for noise attenuation adjacent to residential areas and be screened with landscaping (evergreen trees twenty feet on center) so the loading docks are not visible from residential areas or public streets.

4.13.3 Environmental Setting
Ambient Noise Measurements
To determine a baseline noise level in the vicinity of the Project, ambient noise monitoring was conducted in the vicinity of the Project Site. Noise monitoring was conducted on November 17, 2022, and November 18, 2022. Noise measurements consisted of three short-term (15-minute) measurements during the afternoon peak traffic hours of 3:00 pm to 6:00 pm; and one long-term (24-hour) measurement. Although the noise monitoring was conducted in late 2022, it is applicable for establishing baseline conditions as the Project area is dominated by traffic noise and there have been no significant changes in the Project area since the monitoring was conducted. Additionally, the noise modeling included in the technical appendices to the Noise and Vibration Technical Study, Appendix G, is based on the Project as proposed.

The primary noise source at all measurement locations is roadway traffic. Activities from surrounding commercial and retail uses (such as car doors shutting, faint music, conversations, and truck delivery/loading) also contributed to the overall noise environment. Meteorological conditions during the measurement period were favorable for outdoor sound measurements and were noted to be representative of the typical conditions for the season. Generally, conditions included cloudy skies with temperatures varying between 65 to 73 degrees Fahrenheit (°F) and winds averaging 1 mile per hour (mph) or less. All sound level meters were equipped with a windscreen during measurements.

Results are summarized in Table 4.13-4, Long-Term Noise Measurement Summary and Table 4.13-4, Short Term Noise Measurement Summary below and shown on Figure 3, Riverview Marketplace Commercial Project
Environmental Impact Report 4.13 Noise
City of Bakersfield – SCH No. 2025101507 4.13-9
Approximate Noise Monitoring Locations within Appendix G, Noise and Vibration Technical Study.

Table 4.13-4 Long-Term Noise Measurement Summary
Monitoring
Location Description
24-hour Noise Level, dBA
CNEL Lowest Leq(1hr) Highest Leq(1hr)
LT-1
8290 Rosedale Highway
(between Arby’s and Del
Taco restaurants).
11/17/2022, 2:00 pm
79 65.5 76.0
Table 4.13-5 Short-Term Noise Measurements Summary in A-Weighted Sound Levels Monitoring
Location Description
15-Minute Noise Level, dBA
Leq Lmax Lmin L50 L25 L8 L2
ST-1 Alongside Rosedale Highway
(SR-58) 11/17/2022, 4:57 pm 80.2 101.8 58.0 73.9 78.7 81.2 86.8 ST-2 Across 2301 El Toro Viejo Road
(residence) 11/17/2022, 4:32 pm 67.3 83.5 50.1 57.6 64.1 72.7 77.4 ST-3 Coffee Road north of Jet Way
11/17/2022, 3:11 pm 75.7 90.6 56.4 73.4 76.5 79.7 82.3
• Long-Term Location 1 (LT-1) was mounted along Rosedale Highway (State Route 58) at 8290 Rosedale Highway (between Arby’s and Del Taco restaurants) and approximately 60 feet north of the nearest westbound travel lane centerline. A 24-hour noise measurement was conducted, beginning at 2:00 pm on Thursday, November 17, 2022.

The noise environment is characterized primarily by Rosedale Highway vehicular traffic. • Short-Term Location 1 (ST-1) was at the northern project site boundary next to 8875 Rosedale Highway (a Sonic restaurant). The measurement location was approximately 15 feet south of the nearest eastbound travel lane centerline. A 15-minute noise measurement began at 4:57 pm on Thursday, November 17, 2022. The noise environment is characterized primarily by traffic noise from Rosedale Highway. Traffic noise generally ranged from 70 dBA to 83 dBA.
• Short-Term Location 2 (ST-2) was along the western project site boundary across from 2301 El Toro Viejo Road (residence). The measurement location was approximately 5 feet east of the nearest northbound travel lane centerline. A 15-minute noise measurement began at 4:32 pm on Thursday, November 17, 2022. The noise environment is characterized primarily by traffic noise from Rosedale Highway and El Toro Viejo Road.

Secondary noise sources included truck-stop operations of power washers, cargo doors opening and closing, and heavy-duty trucks moving and loading and unloading cargo.

Traffic noise levels generally ranged from 60 dBA to 75 dBA from local traffic. Traffic from Rosedale Highway was up to 60 dBA. Other noise levels from secondary noise sources ranged between 50 dBA to 55 dBA.
• Short-Term Location 3 (ST-3) was across the project site boundary along Coffee Road just north of Jet Way. A 15-minute noise measurement began at 3:11 pm on Thursday, November 17, 2022. This is a high-traffic-volume area, and the noise environment is characterized by roadway noise from Coffee Road and Rosedale Highway. Noise levels generally ranged between 70 dBA to 83 dBA.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.13 Noise
City of Bakersfield – SCH No. 2025101507 4.13-10
Sensitive Receptors
Certain land uses are particularly sensitive to noise and vibration, including residential, schools, hospitals, and open space/recreation areas where quiet environments are necessary for enjoyment, public health, and safety. These uses are regarded as sensitive to noise because they are where citizens most frequently engage in activities which are likely to be disturbed by noise, such as reading, studying, sleeping, resting, or otherwise engaging in quiet or passive recreation.

Commercial and industrial uses are not particularly sensitive to noise or vibration. The nearest existing sensitive receptors to the Project Site include the Green Acres Estates Senior Mobile Home Park to the west along Rosedale Highway and single-family residential uses to the southwest along El Toro Viejo Road. Additional residential receptors are more than 750 feet from the Project Site to the north.

4.13.4 Impact Analysis
Methodology
The analysis of construction noise from future development projects anticipated under the City’s General Plan utilizes the Federal Highway Administration (FHWA) Roadway Construction Noise Model (RCNM). The model is based on a representative equipment mix for standard construction activities. Given the variable nature of construction, the worst-case scenario is modeled by combining the Leq contributions from the simultaneous operation of the three loudest pieces of equipment for a given activity. Construction noise levels are modeled from the acoustical center of a hypothetical construction area of each phase to the property line of the nearest noise-sensitive receptor.

Future traffic noise levels were calculated for roadway segments forecasted to experience the most substantial increases in traffic volume. Transportation noise levels were modeled using the FHWA Traffic Noise Prediction Model, incorporating the provided traffic volumes, posted speeds, vehicle type percentages, number of lanes, and intervening site conditions. Average daily traffic (ADT) segment volumes provided by Integrated Engineering Group (IEG) for existing and project buildout are used to estimate traffic noise increases.

Groundborne vibration and noise from construction is determined using Federal Transit Administration (FTA) methodology and reference vibration levels for typical equipment. Vibration levels are modeled from the nearest disturbance area of the construction site to the foundation or building façade of the nearest sensitive receptor.

Thresholds of Significance
The City utilizes the California Environmental Quality Act (CEQA) Guidelines, Appendix G, and thresholds of significance1to analyze the environmental impacts of the Project. Per CEQA Guidelines, an impact is considered significant if the Project would result in:
• Generation of a substantial temporary or permanent increase in ambient noise levels in the vicinity of the project in excess of standards established in the local general plan or noise ordinance, or applicable standards of other agencies. (Threshold N-1) 1 Association of Environmental Professionals (AEP). 2025. CEQA Guidelines Appendices, Appendix G: Environmental Checklist Form. Available at: https://www.califaep.org/docs/CEQA_Handbook_2025combined.pdf. Accessed January 2026.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.13 Noise
City of Bakersfield – SCH No. 2025101507 4.13-11
• Generation of excessive ground-borne vibration or ground-borne noise levels. (Threshold N-2)
• For a project located within the vicinity of a private airstrip or an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, would the project expose people residing or working in the project area to excessive noise levels. (Threshold N-3)
As mentioned above, under the General Plan Noise Element, Implementation 10, a significant traffic noise impact would occur if the Project would result in a noise increase at noise sensitive land uses of:
• 1.5 dBA or more where the existing noise level is above 65 dBA CNEL. • 3 dBA or more where the existing noise level is between 60 to 65 dBA CNEL. • 5 dBA or more where the existing noise level is less than 60 dBA CNEL.

Construction Noise
Section 9.22.050 of the Bakersfield Municipal Code prohibits construction activities from 9:00 p.m. to 6:00 a.m., Monday through Friday (including federal holidays), and before 8:00 a.m. or after 9:00 p.m. on weekends. The City does not have an established noise threshold for construction noise. The FTA provides criteria for acceptable construction noise levels and recommends a daytime noise threshold of 80 dBA Leq for residential uses, 85 dBA Leq for commercial uses, and 90 dBA Leq for industrial uses. For the purposes of this analysis, the FTA criterion is used for nearby receptors.

Stationary Noise
The City’s General Plan Noise Element establishes exterior noise levels based on receiving land use. Residential areas shall not exceed an exterior daytime noise level of 75 dBA Lmax or 55 dBA L50 and an exterior nighttime noise level of 70 dBA Lmax or 50 dBA L50. These exterior noise standards are used to determine impact significance at nearby sensitive receptors.

Vibration
The City does not have specific thresholds for vibration-induced architectural damage related to construction activities. The FTA provides criteria for acceptable levels of ground-borne vibration for various types of buildings. Therefore, to determine impact significance, the FTA criteria was used for this analysis. These criteria are shown in 4.13-6, Groundborne Vibration Criteria:

Architectural Damage. For purposes of this analysis, the threshold of 0.2 PPV (in/sec) will be used to determine impact significance for building vibration damage to residential uses and 0.3 PPV (in/sec) will be used for commercial buildings.

Table 4.13-6 Groundborne Vibration Criteria: Architectural Damage Building Category PPV (in/sec)
I. Reinforced concrete, steel, or timber (no plaster) 0.5 II. Engineered concrete and masonry (no plaster) 0.3
III. Nonengineered timber and masonry buildings 0.2
IV. Buildings extremely susceptible to vibration damage 0.12 Source: FTA 2018.

Note: PPV = peak particle velocity
Riverview Marketplace Commercial Project
Environmental Impact Report 4.13 Noise
City of Bakersfield – SCH No. 2025101507 4.13-12
The City does not have specific thresholds for vibration-induced annoyance related to construction activities. The FTA provides criteria for acceptable levels of ground-borne annoyance. Therefore, to determine impact significance, the FTA criteria were used for this analysis. These criteria are shown in Table 4.13-7, Groundborne Annoyance Criteria.

According to FTA’s Transit Noise and Vibration Impact Assessment Manual, a vibration velocity (VdB) of 75 to 85 VdB will annoy individuals. For purposes of this analysis, the threshold of 75 VdB was used to determine impact significance for human vibration annoyance for residential uses and 85 VdB was used for commercial uses.

Table 4.13-7 Groundborne Annoyance Criteria
Vibration
Velocity Level
Noise Level
Human Response
Low Frequency Mid Frequency
65 VdB 25 dBA 40 dBA
Approximate threshold of perception for many
humans. Low-frequency sound: usually inaudible. Mid-frequency sound: excessive for quiet sleeping areas. 75 VdB 35 dBA 50 dBA
Approximate dividing line between barely perceptible
and distinctly perceptible. Many people find transit
vibration at this level annoying. Low-frequency noise:
tolerable for sleeping areas. Mid-frequency noise:
excessive in most quiet occupied areas.
85 VdB 45 dBA 60 dBA
Vibration tolerable only if there are an infrequent
number of events per day. Low-frequency noise:
excessive for sleeping areas. Midfrequency noise:
excessive even for infrequent events for some
activities.

Source: FTA 2018, Table 5-5.

Notes: Low Frequency= Approximate noise level when vibration spectrum peak is near 30 hertz (Hz).

Mid Frequency= Approximate noise level when vibration spectrum peak is near 60 Hz.

Project Impacts
NOI-1: The proposed project’s construction activities would result in temporary noise increases in the vicinity of the project site that would not exceed applicable standards. [Threshold N-1]
Impact Analysis
Construction
The transport of workers and materials to and from the construction site would incrementally increase noise levels along Rosedale Highway. Individual construction vehicle pass-bys may create momentary noise levels of up to approximately 85 dBA (Lmax) at 50 feet from the vehicle, but these occurrences would generally be infrequent and short-lived. Based on data provided by the applicant, the Project would generate up to 264 combined temporary worker and vendor daily trips during the overlapping building construction and site preparation phases. A maximum of 140 daily haul truck tips is estimated during off-site improvements. Existing trips along Rosedale Highway are over 20,000 ADT. The addition of these construction trips would be temporary and would not substantially increase ambient noise levels. When compared to the thousands of existing daily trips along Rosedale Highway and Coffee Road, the traffic noise increase would be less than 0.1 dBA CNEL. Therefore, the Project would have a less than significant impact.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.13 Noise
City of Bakersfield – SCH No. 2025101507 4.13-13
Construction Equipment
Noise generated by on-site construction equipment is based on the type of equipment used, its location relative to sensitive receptors, and the timing and duration of noise-generating activities.

Each phase of construction involves different types of equipment and has distinct noise characteristics. Noise levels from construction activities are typically dominated by the loudest pieces of equipment. The dominant equipment noise source is typically the engine, although work-piece noise (such as dropping of materials) can also be noticeable.

The Project would be constructed in two phases. Each phase has its own set of construction activities; however, they all have similar equipment mixes in each activity (e.g., site preparation, demolition, and paving). This construction noise analysis modeled the worst-case phase in terms of number of equipment, equipment noise levels, and proximity to off-site sensitive receptors. The noise produced by each activity is determined by combining the Leq contributions from the top three loudest pieces of equipment used at a given time while accounting for the ongoing time variations of engine under load (commonly referred to as the usage factor). Heavy equipment, such as a dozer or a loader, can have maximum, short-duration noise levels of up to 85 dBA at 50 feet. However, overall noise emissions vary considerably, depending on the specific activity at any given moment.

Noise attenuation due to distance, the number and type of equipment, and the load and power requirements to accomplish tasks at each construction phase would result in different noise levels at a given receptor. Since noise from construction equipment is intermittent and diminishes at a rate of at least 6 dBA per doubling of distance (conservatively ignoring other attenuation effects from air absorption, ground effects, and shielding effects), the average noise levels at noise-sensitive receptors could vary considerably as mobile construction equipment moves around the site (site of each development phase) with different loads and power requirements. The City of Bakersfield does not have an established construction noise threshold. Therefore, the FTA criterion of 80 dBA Leq is used to determine impact significance at off-site sensitive receptors and 85 dBA Leq is used for off-site non-noise sensitive receptors.

Construction noise levels associated with the Project were modeled using RCNM from the acoustical center of the construction activity area to the nearest sensitive receptors. Equipment for grading and site preparation is modeled at spatially averaged distances (i.e., from the acoustical center of the general construction site to the property line of the nearest receptors) because the area around the center of construction activities best represents the potential average construction-related noise levels at the various sensitive receptors for mobile equipment.

Building construction and architectural coating are measured from the edge of the proposed buildings to the nearest sensitive receptors. Additionally, paving is measured from the nearest paving areas to the nearest sensitive receptors. Construction noise modeling does not account for existing masonry walls at nearby residential property lines (e.g., single-family residential uses to the southwest along El Toro Viejo Road), which could provide up to 6 dBA reduction based on existing wall heights. Results are summarized in 4.13-8, Phase 1 Project-Related Construction Noise, dBA Leq, and Table 4.13-9, Phase 2 Project-Related Construction Noise, dBA Leq.

As demonstrated in Tables 4.13-8 and 4.13-9, construction noise levels due to development of Phase 1 and Phase 2 of the Project would be below the FTA thresholds for residential (80 dBA Leq) and commercial uses (85 dBA Leq). Therefore, Project related construction noise impacts would be less than significant.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.13 Noise
City of Bakersfield – SCH No. 2025101507 4.13-14
Table 4.13-8 Phase 1 Project-Related Construction Noise, dBA Leq Construction
Activity Phase
RCNM
Reference
Noise
Level
Nearest Off-Site Receptors
Commercial
Receptor to
North
Commercial
Receptor to
East
Residential
Receptor to
South
Commercial
Receptor to
West
Distance in feet: 50 300 580 275 225
Site Prep 84 68 62 69 71
Rough Grading 84 69 63 70 71
Fine Grading 83 67 61 68 70
Distance in feet: 50 215 415 380 70
Building Construction 75 62 56 57 72
Architectural Coating 77 64 58 59 74
Distance in feet: 50 180 395 130 55
Paving 79 68 61 71 78
Distance in feet: 50 200 415 185 65
Utilities Trenching 81 69 62 69 78
Maximum dBA Leq 69 63 71 78
Exceeds FTA Threshold? 1 No No No No
Notes: Calculations with the FHWA RCNM software are in Appendix G 1 FTA Thresholds: 80 dBA residential, 85 dBA commercial Table 4.13-9 Phase 2 Project-Related Construction Noise, dBA Leq Construction
Activity Phase
RCNM
Reference
Noise Level
Nearest Off-Site Receptors
Commercial
Receptor to North
Commercial
Receptor to East
Residential
Receptor to West
Distance in feet: 50 1,350 585 1,950
Site Prep 84 55 62 52
Rough Grading 84 56 63 53
Fine Grading 83 54 61 51
Distance in feet: 50 1,200 505 1,825
Building Construction 75 47 54 43
Architectural Coating 77 49 57 45
Distance in feet: 50 1,150 465 1,770
Paving 79 52 60 48
Utilities Trenching 81 53 62 50
Maximum dBA Leq 56 63 53 53
Exceeds FTA
Threshold? 1
No No No No
Notes: Calculations with the FHWA RCNM software are in Appendix G. 1 FTA Thresholds: 80 dBA residential, 85 dBA commercial Construction Noise from Off-Site Roadway Improvements
As a part of the Project, various roadway improvement would be implemented along Rosedale Highway and Coffee Road. These off-site improvements would require construction equipment, including but not limited to water trucks, loaders, pavers, rollers, air compressors, tractors, scrapers, and graders. Construction activities from roadway improvements would not expose surrounding sensitive receptors to prolonged periods of construction noise. Though some equipment could reach up to 85 dBA Leq at a distance of 50 feet, construction for the off-site improvements would progress in a linear fashion, generating less noise at each receptor each Riverview Marketplace Commercial Project
Environmental Impact Report 4.13 Noise
City of Bakersfield – SCH No. 2025101507 4.13-15
day. The nearest off-site sensitive receptor is approximately 700 feet south of the proposed roadway improvements and noise levels would be up to 62 dBA Leq. Additionally, off-site roadway improvements would be temporary and anticipated to last a limited period—22 work days—and would not occur during nighttime hours. Construction noise levels due to off-site roadway improvements of the Project would be below the FTA thresholds for residential (80 dBA Leq) and commercial uses (85 dBA Leq). Therefore, Project related off-site roadway improvements construction noise impacts would be less than significant.

Mitigation Measures
None required.

Level of Significance After Mitigation
Less than significant with no mitigation required.

NOI-2: Project implementation would result in long-term, operation-related noise that would not exceed local standards. [Threshold N-1] Impact Analysis
Mobile-Source Noise Impacts
A project will normally have a significant effect on the environment related to noise if it substantially increases the ambient noise levels at adjoining areas. Most people can detect changes in sound levels of approximately 3 dBA under normal, quiet conditions, and changes of 1 to 3 dBA under quiet, controlled conditions. Changes of less than 1 dBA are usually indiscernible. A change of 5 dBA is readily discernible to most people in an exterior environment.

Noise levels above 65 dBA CNEL are normally unacceptable at sensitive receptor locations such as residences, schools, and noise environments in these areas would be considered degraded.

Based on this, a significant impact would occur if the following traffic noise increases occur relative to the existing noise environment or exceed 65 dBA CNEL. The Project traffic analysis included 26 study roadway segments in the project vicinity. Table 4.13-10, Project and Cumulative Traffic Noise Increase, shows that the estimated project and cumulative traffic noise increase over existing conditions at the 26 study roadway segments would be up to 0.4 dBA CNEL. As shown in the table, the Project would not exceed the 1.5 dBA minimum threshold. In addition, the estimated cumulative related traffic noise increase would be less than 1 dBA CNEL and the contribution from the Project would also be less 1 dBA CNEL. As shown in Table 4.13-10, the Project would comply with General Plan Noise Element Implementation 10. Therefore, Project related traffic noise impacts would be less than significant.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.13 Noise
City of Bakersfield – SCH No. 2025101507 4.13-16
This page intentionally left blank.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.13 Noise
City of Bakersfield – SCH No. 2025101507 4.13-17
Table 4.13-10 Project and Cumulative Traffic Noise Increase Roadway Segment
Traffic Noise Increase in dBA CNEL
2027 No
Project
2027 with
Proposed
Project Increase
2028 No
Project
2028 with
Proposed
Project Increase
2046 No
Project
2046 with
Proposed
Project Increase
Rosedale Highway (CA-58) Old Farm Road to Verdugo Lane 73.3 73.5 0.2 73.3 73.5 0.2 73.3 73.5 0.2 Rosedale Highway (CA-58) Verdugo Lane to Calloway Drive 73.9 74.2 0.2 73.9 74.2 0.2 73.9 74.2 0.3 Rosedale Highway (CA-58) Calloway Drive to El Toro Viejo Road/Clay Patrick Farr Way

75.1 75.4 0.3 75.1 75.4 0.3 75.1 75.5 0.4
Rosedale Highway (CA-58) El Toro Viejo Road/Clay Patrick Farr Way to Northwest Promenade

75.3 75.7 0.4 75.3 75.7 0.4 75.3 75.7 0.5
Rosedale Highway (CA-58) Northwest Promenade to Coffee Road 75.4 75.6 0.2 75.4 75.6 0.2 75.4 75.6 0.3 Rosedale Highway (CA-58) Coffee Road to Patton Way 74.9 75.0 0.1 74.9 75.0 0.1 74.9 75.0 0.1 Coffee Road Olive Drive to Hageman Road 75.0 75.2 0.2 75.1 75.2 0.1 75.7 75.9 0.2 Coffee Road Hageman Road to Meany
Avenue/Riverlakes Drive

75.8 76.0 0.2 75.8 76.0 0.1 76.5 76.7 0.2
Coffee Road Riverlakes Drive/Meany Avenue to
Downing Avenue

76.7 76.9 0.2 76.7 76.9 0.2 77.4 77.6 0.2
Coffee Road Downing Avenue to Granite Falls
Drive

76.9 77.1 0.2 77.0 77.1 0.2 77.6 77.9 0.2
Coffee Road Granite Falls Drive to Rosedale
Highway (CA-58)

76.7 76.9 0.2 76.7 76.9 0.2 77.3 77.6 0.3
Coffee Road Rosedale Highway (CA-58) to Jet Way 77.4 77.6 0.2 77.4 77.6 0.2 78.0 78.3 0.2 Coffee Road Jet Way to Brimhall Road 77.5 77.9 0.5 77.5 77.9 0.4 78.1 78.6 0.5 Coffee Road Brimhall Road to Westside Parkway
EB Ramps

78.3 78.4 0.2 78.3 78.4 0.1 78.9 79.0 0.2
Coffee Road Westside Parkway EB Ramps to
Truxtun Road

77.5 77.7 0.2 77.5 77.7 0.2 78.1 78.3 0.2
Coffee Road Truxtun Road and Stockdale Highway 78.2 78.4 0.1 78.2 78.4 0.1 78.3 78.5 0.2 Calloway Drive Noriega Road to Hageman Road 75.4 75.4 0.1 75.4 75.4 0.0 75.9 75.9 0.1 Calloway Drive Hageman Road to Meacham Road 75.5 75.6 0.1 75.6 75.6 0.1 75.6 75.7 0.1 Calloway Drive Meacham Road to Rosedale Highway
(CA-58)

75.8 75.9 0.1 75.8 75.9 0.1 75.9 76.0 0.1
Calloway Drive Rosedale Highway (CA-58) to Brimhall
Road

76.7 76.8 0.1 76.7 76.8 0.1 77.0 77.1 0.1
Brimhall Road Allen Road to Old Farm Road 69.3 69.5 0.2 69.3 69.5 0.2 69.7 69.9 0.2 Brimhall Road Old Farm Road to Jewetta Avenue 70.1 70.4 0.3 70.1 70.4 0.2 70.6 70.8 0.3 Brimhall Road Jewetta Avenue to Verdugo Lane 70.8 71.2 0.4 70.9 71.2 0.3 71.3 71.7 0.4 Riverview Marketplace Commercial Project
Environmental Impact Report 4.13 Noise
City of Bakersfield – SCH No. 2025101507 4.13-18
Roadway Segment
Traffic Noise Increase in dBA CNEL
2027 No
Project
2027 with
Proposed
Project Increase
2028 No
Project
2028 with
Proposed
Project Increase
2046 No
Project
2046 with
Proposed
Project Increase
Brimhall Road Verdugo Lane to Calloway Drive 71.6 71.9 0.3 71.6 71.9 0.3 72.0 72.4 0.4 Brimhall Road Calloway Drive to Harvest Creek Road 71.9 72.3 0.4 71.9 72.3 0.4 72.4 72.8 0.5 Brimhall Road Harvest Creek Road to Coffee Road 72.3 72.8 0.4 72.4 72.8 0.4 73.0 73.4 0.4 Hageman Road Calloway Drive to Coffee Road 73.3 73.5 0.2 73.3 73.5 0.2 73.3 73.5 0.2 Source: Project traffic provided by IEG (2025). .

Riverview Marketplace Commercial Project
Environmental Impact Report 4.13 Noise
City of Bakersfield – SCH No. 2025101507 4.13-19
Stationary-Source Noise Impacts
Car Wash
The Project includes the development of a car wash near the northwestern end of the Project Site. The car wash would generate noise at the nearby receptors primarily due to vacuums and the tunnel dryers. Dryer and vacuum noise levels decrease by approximately 6 dBA for each doubling of distance from the source (not including ground attenuation effects and shielding factors). The analysis below uses the City’s 75 dBA Lmax or 55 dBA L50 daytime and 70 dBA Lmax or 50 dBA L50 nighttime exterior noise standards to determine impact significance at nearby sensitive receptors. It should be noted that Leq noise levels represent a steady state sound level containing the same total energy as a time varying signal over a given sample period.

Vacuum Noise
Noise measurements from a car wash study with similar layout, equipment, and capacity were conducted. Based on these measurements, noise from unholstered, in-use vacuums was 64 dBA at a distance of 40 feet. Typically, the average person uses a vacuum for 5 minutes, and 60 percent of the vacuums are conservatively assumed to operate at once, which would be 13 vacuums. The simultaneous use of 13 vacuums would equal approximately 75 dBA at 40 feet.

The nearest residential receptor to the proposed vacuum stalls is approximately 780 feet southwest and the nearest commercial receptor is approximately 345 feet to the north. Vacuum stall noise levels at the nearest residential receptor would be approximately 49 dBA, and approximately 56 dBA at nearest commercial use to the north, without accounting for shielding provided by the proposed storage building and proposed Pad 2 building. Conservatively assuming a 3 dBA reduction to account for shielding that would be provided by the current site plan showing an on-site storage building and 8 dBA reduction to account for shielding that would be provided by the Pad 2 building, vacuum stall noise levels would be approximately 45 dBA at the nearest residential receptor and 48 dBA at the nearest commercial receptor.

Tunnel Dryer
Tunnel dryers are typically placed one to two feet within the car wash exit structure. Dryer noise levels are approximately 80 dBA at 30 feet, based on previous PlaceWorks car wash measurements. The nearest residential receptor to the tunnel dryer is approximately 780 feet southwest and the nearest commercial receptor is approximately 265 feet to the north. Tunnel dryer noise levels at the nearest residential receptor would be approximately 52 dBA, and approximately 61 dBA at the nearest commercial use to the north, without accounting for shielding provided by the proposed storage building. Conservatively assuming a 5 dBA reduction to account for shielding that would be provided by the on-site storage building, tunnel dryer noise levels would be approximately 47 dBA at the nearest residential receptor.

Table 4.13-11 shows approximate car wash noise levels at the nearest sensitive receptors with the operation of the Project. These calculations conservatively take into account shielding from proposed on-site buildings. Ambient noise monitoring indicates that existing ambient noise levels currently exceed the daytime noise standard.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.13 Noise
City of Bakersfield – SCH No. 2025101507 4.13-20
Table 4.13-11 Attenuated Noise Levels at Sensitive Receptors, dBA Lmax Reference Noise Source
Reference Noise
Level
Commercial to
North1, 2 Residential to South1
Distance in feet 40 345 770
Vacuum on (unholstered) 64 48 45
Distance in feet 30 265 780
Tunnel dryers 80 61 47
Cumulative Noise Level 61 49
Measured L50 (Existing Ambient)3

73.9 57.6
Measured Lmax (Existing Ambient)3
101.8 83.5
Note: dBA = A-weighted Sound Pressure Level.

Noise levels rounded up or down to the nearest whole number. 1 Distance measured from the center of vacuum stalls and tunnel dryers to nearest receptor (based on site plans provided by applicant). 2 Accounts for shielding from on-site structures.
3 See Table 7 for ambient noise measurements.

As shown in Table 4.13-11, existing ambient L50 and Lmax noise levels currently exceed daytime and nighttime City thresholds. Referenced car wash equipment manufacturer specifications noise levels are shown in Lmax, the attenuated noise levels in Table 4.13-11 represent Lmax values that are evaluated against the City's Lmax exterior noise standard. Cumulative vacuum and tunnel dryer Lmax noise levels would not exceed the existing ambient noise levels at the nearest residential receptor to the southwest and commercial uses to the north. Proposed Project car wash operational noise levels would not exceed the City’s 75 dBA Lmax daytime and 70 dBA Lmax nighttime exterior noise standards. Furthermore, Leq noise levels represent a steady state sound level containing the same total energy as a time varying signal over a given sample period.

Conservatively assuming Table 4.13-11 Lmax car wash noise levels occurred 50% over a given sample period, operational noise levels would not exceed the City’s 55 dBA L50 daytime and 50 dBA L50 nighttime exterior noise standards as well. In addition, car wash operational noise would be less than the existing ambient noise by approximately 8 dBA to 12 dBA. Therefore, Project related operational car wash noise impacts would be less than significant.

Loading and Unloading
The Project includes a mix of commercial and retail uses that would include loading and unloading activities. The nearest residential receptor is approximately 1,800 feet west from the nearest proposed retail building with loading docks. PlaceWorks staff collected noise measurements for loading dock operations with trailers that have truck refrigeration units (TRU). Measurements data showed a single TRU generated average noise levels of 63.0 dBA L50 at 20 feet. The nearest “Major Retail” buildings support three trailers at each loading dock. At a distance of 1,800 feet, operations from a single TRU would attenuate to approximately 24 dBA L50. When accounting for three TRUs operating simultaneously, noise would be up to 29 dBA L50 at the nearest residences.

Assuming all seven Major Retail loading docks were operating simultaneously, noise would be up to 38 dBA L50 at the nearest residences. Proposed project loading and unloading operational noise levels would not exceed the City’s 55 dBA L50 daytime and 50 dBA L50 nighttime exterior noise standards. In addition, loading dock operational noise would be less than the existing ambient noise. Therefore, Project related operational loading dock noise impacts would be less than significant.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.13 Noise
City of Bakersfield – SCH No. 2025101507 4.13-21
Mechanical Equipment
The Project would include the use of rooftop heating, ventilation, and cooling (HVAC) systems for the commercial and retail buildings. HVAC equipment would be no closer than 360 feet from the nearest receptor property line. Typical HVAC noise is approximately 72 dBA at a distance of 3 feet (York 2026). At 360 feet, HVAC noise would attenuate to approximately 30 dBA Leq. Because HVAC mechanical equipment is a steady-state noise source, the Leq would not vary considerably from the L50. Therefore, HVAC noise levels would not exceed the City’s 55 dBA L50 daytime and 50 dBA L50 nighttime exterior noise standards. Additionally, HVAC noise levels would be below the existing ambient noise level of 67.3 dBA Leq at the nearest residence. Therefore, Project related operational HVAC noise impacts would be less than significant.

Drive-Thru Operations
The Project would include multiple drive-thru restaurants with varying hours of operation. Noise associated with drive-thru windows would be predominantly from the speaker boxes. Field measurements measured typical drive-thru speaker box noise at approximately 73.6 dBA L50 at four feet. The closest noise-sensitive receptor to a proposed drive-thru speaker box is approximately 650 feet southwest, adjacent to Rosedale Highway on the north side of the proposed Pad 1. At 650 feet, noise levels would attenuate to approximately 52 dBA L50, without accounting for shielding provided by the proposed Pad 1 building. Conservatively assuming an 8 dBA reduction to account for shielding that would be provided by the Pad 1 building, speaker box noise levels would be approximately 46 dBA L50 at the nearest noise sensitive receptors.

Therefore, speaker box noise levels would not exceed the City’s 55 dBA L50 daytime and 50 dBA L50 nighttime exterior noise standards, and impacts would be less than significant.

Combined Stationary Source Noise
Ambient noise levels measured 67.3 dBA Leq, 57.6 dBA L50, and 83.5 dBA Lmax at the nearest residence to the Project Site. The combined noise level from the operation of the Project at the nearest residence to the southwest would be approximately 51 dBA L50, when accounting for existing and proposed intervening structures. Combined Project noise levels would not exceed the City’s 55 dBA L50 daytime exterior noise standard at the nearest noise sensitive residential use to the southwest. Project operational hours would not extend past 10:00 PM on any given day, which would result in combined stationary noise levels that would comply with the 50 dBA L50 nighttime exterior noise standard at the nearest noise sensitive residential use to the southwest. Additionally, combined noise levels would be below existing ambient noise levels.

Therefore, combined stationary noise impacts would be less than significant.

Mitigation Measures
None required.

Level of Significance After Mitigation
Less than significant with no mitigation required.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.13 Noise
City of Bakersfield – SCH No. 2025101507 4.13-22
NOI-3 The project would not create excessive short-term or long-term groundborne vibration and groundborne noise. [Threshold N-2] Impact Analysis
Construction Vibration
Potential vibration impacts associated with development projects are usually related to the use of heavy construction equipment during the demolition and grading phases of construction.

Construction can generate varying degrees of ground vibration depending on the construction procedures and equipment. Construction equipment generates vibration that spreads through the ground and diminishes with distance from the source. The effect on buildings in the vicinity of the construction site varies depending on soil type, ground strata, and receptor-building construction.

The effects from vibration can range from no perceptible effects at the lowest vibration levels, to low rumbling sounds and perceptible vibrations at moderate levels, to slight structural damage at the highest levels. Vibration from construction activities rarely reaches the levels that can damage structures. Pile driving is not proposed.

Architectural Damage
The FTA criteria for architectural damage vary based on the building category. The applicable FTA threshold for the surrounding off-site commercial structures is 0.30 in/sec PPV, and the applicable FTA threshold for residential uses is 0.20 in/sec PPV. At a distance greater than approximately 20 feet, construction-generated vibration levels at the commercial buildings would be less than the 0.30 in/sec PPV threshold, and at a distance greater than approximately 25 feet, vibration levels would be less than the 0.20 in/sec PPV threshold. To determine potential vibration-induced architectural damage, the distance from the vibration source (construction equipment) to the vibration-sensitive receptors (commercial/residential buildings) is measured from the edge of the construction site to the nearest building façade.

The nearest off-site commercial structure to Phase 1 construction is approximately 55 feet west and the nearest residential structures are approximately 130 feet south of Phase 1 Project Site area. Table 4.13-12, Vibration Impact Levels for Phase 1 Construction Equipment (in/sec PPV), summarizes vibration levels at the various receptors. As shown in 4.13-12, Phase 1 construction vibration levels would not exceed the 0.30 and 0.20 in/sec PPV thresholds at the nearest commercial and residential structures, respectively.

Table 4.13-12 Vibration Levels for Phase 1 Construction Equipment (in/sec PPV) Equipment
Levels in in/sec, PPV
Reference
levels
at 25 feet
Commercial to
north
at 180 feet1
Commercial to
east at 395
feet1
Residential
to south at
130 feet1
Commercial to
west at 55 feet1
Vibratory Roller 0.21 0.011 0.003 0.018 0.064
Large Bulldozer 0.089 0.005 0.001 0.008 0.027
Caisson Drilling 0.089 0.005 0.001 0.008 0.027
Loaded Trucks 0.076 0.004 0.001 0.006 0.023
Jackhammer 0.035 0.002 0.001 0.003 0.011
Small Bulldozer 0.003 0.000 0.000 0.000 0.001
Source: FTA 2018.
1 As measured from the nearest edge of construction site to structure/building facade.

The nearest off-site commercial structure to Phase 2 construction is approximately 465 feet east and the nearest residential structures are approximately 1,770 feet west of Phase 2 project site Riverview Marketplace Commercial Project
Environmental Impact Report 4.13 Noise
City of Bakersfield – SCH No. 2025101507 4.13-23
area. Table 4.13-13, Vibration Impact Levels for Phase 2 Construction Equipment, summarizes vibration levels at the various receptors. As shown in Table 4.13-13, construction vibration levels would not exceed the 0.30 and 0.20 in/sec PPV thresholds at the nearest commercial and residential receptors, respectively.

Table 4.13-13 Vibration Levels for Phase 2 Construction Equipment (in/sec PPV) Equipment
Levels in in/sec, PPV
Reference
levels
at 25 feet
Commercial to north
at 1,150 feet1
Commercial to east
at 465 feet1
Residential to west
at 1,770 feet1
Vibratory Roller 0.21 0.001 0.003 0.000
Large Bulldozer 0.089 0.000 0.001 0.000
Caisson Drilling 0.089 0.000 0.001 0.000
Loaded Trucks 0.076 0.000 0.001 0.000
Jackhammer 0.035 0.000 0.000 0.000
Small Bulldozer 0.003 0.000 0.000 0.000
Source: FTA 2018.
1 As measured from the nearest edge of construction site to structure/building facade.

Construction vibration levels due to Phase 1 and Phase 2 of the Project would be below the FTA thresholds for vibration levels and would not exceed the 0.30 and 0.20 in/sec PPV thresholds at the nearest commercial and residential receptors, respectively. Therefore, Project related architectural damage vibration impacts would be less than significant.

Vibration Annoyance
The City does not have specific thresholds for vibration-induced annoyance related to construction activities. For purposes of this analysis, the threshold of 75 VdB will be used to determine impact significance for human vibration annoyance for residential uses and 85 VdB will be used for commercial uses. At a distance greater than approximately 50 feet, construction-generated vibration levels would be less than the 85 VdB, and at a distance greater than approximately 85 feet, vibration levels would be 78 VdB or less. To determine potential vibration-induced annoyance, the distance from the vibration source (construction equipment) to the vibration-sensitive receptors (commercial/residential buildings) is measured from the edge of the construction site to the nearest building façade.

The nearest off-site commercial structure to Phase 1 construction is approximately 55 feet west and the nearest residential structures are approximately 130 feet south of Phase 1 project site area. Table 4.13-14, Vibration Impact Levels for Phase 1 Construction Equipment (VdB), summarizes vibration levels at the various receptors. As shown in Table 4.13-14, Phase 1 construction vibration levels would not exceed the 85 and 78 VdB thresholds at the nearest commercial and residential structures, respectively.

Table 4.13-14 Vibration Levels for Phase 1 Construction Equipment (VdB) Equipment
Levels in VdB
Reference
levels
at 25 feet
Commercial to
north
at 180 feet1
Commercial to
east at 395
feet1
Residential
to south at
130 feet1
Commercial to
west at 55 feet1
Vibratory Roller 94 68 58 73 84
Large Bulldozer 87 61 51 66 77
Caisson Drilling 87 61 51 66 77
Loaded Trucks 86 60 50 65 76
Jackhammer 79 53 43 58 69
Riverview Marketplace Commercial Project
Environmental Impact Report 4.13 Noise
City of Bakersfield – SCH No. 2025101507 4.13-24
Equipment
Levels in VdB
Reference
levels
at 25 feet
Commercial to
north
at 180 feet1
Commercial to
east at 395
feet1
Residential
to south at
130 feet1
Commercial to
west at 55 feet1
Small Bulldozer 58 32 22 37 48
Source: FTA 2018.
1 As measured from the nearest edge of construction site to structure/building facade.

The nearest off-site commercial structure to Phase 2 construction is approximately 465 feet east and the nearest residential structures are approximately 1,770 feet west of Phase 2 project site area. Table 4.13-15, Vibration Impact Levels for Phase 2 Construction Equipment (VdB), summarizes vibration levels at the various receptors. As shown in Table 4.13-15, Phase 2 construction vibration levels would not exceed the 85 and 78 VdB thresholds at the nearest commercial and residential structures, respectively.

Table 4.13-15 Vibration Levels for Phase 2 Construction Equipment (VdB) Reference
levels
at 25 feet
Commercial to north
at 1,150 feet1
Commercial to east
at 465 feet1
Residential to west
at 1,770 feet1
Vibratory Roller 94 44 56 38
Large Bulldozer 87 37 49 31
Caisson Drilling 87 37 49 31
Loaded Trucks 87 37 49 31
Jackhammer 86 36 48 30
Small Bulldozer 79 29 41 23
Source: FTA 2018.
1 As measured from the nearest edge of construction site to structure/building facade.

Construction vibration levels due to Phase 1 and Phase 2 of the Project would be below the FTA thresholds for vibration levels and would not exceed the 85 and 78 VdB thresholds at the nearest commercial and residential receptors, respectively. Therefore, Project related architectural damage vibration impacts would be less than significant.

Operational Vibration
Commercial operations would generate varying degrees of ground vibration, depending on the operational procedures and equipment. Commercial uses would not be immediately adjacent to vibration-sensitive uses and no significant vibration impacts would occur from vibration generated by proposed project uses. The Project is not the type of land use that could generate significant vibration. Proposed project operation would not include any substantial long-term vibration sources. Therefore, Project related operational vibration impacts would be less than significant.

Mitigation Measures
None required.

Level of Significance After Mitigation
Less than significant with no mitigation required.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.13 Noise
City of Bakersfield – SCH No. 2025101507 4.13-25
NOI-4: The proximity of the project site to an airport or airstrip would not result in exposure of future customers and/or workers to excessive airport-related noise. [Threshold N-3]
Impact Analysis
The nearest airport to the Project Site is Meadows Field Airport (BFL), approximately 3.5 miles to the northeast. The Project would not expose people residing or working in the project area to excessive aircraft noise levels. Therefore, no impact would occur.

Mitigation Measures
None required.

Level of Significance After Mitigation
No impact and no mitigation required.

Cumulative Impacts
The Project traffic analysis included 26 study roadway segments in the project vicinity.

Table 4.13-10, Project and Cumulative Traffic Noise Increase, shows that the Project and cumulative traffic noise increase over existing conditions at the 26 study roadway segments would be up to 0.4 dBA CNEL. As shown in the table, the Project would not exceed the 1.5 dBA minimum threshold. In addition, the estimated cumulative related traffic noise increase would be less than 1 dBA CNEL and the contribution from the Project would also be less than 1 dBA CNEL. As such impacts would be less than significant.

Mitigation Measures
None required.

Level of Significance After Mitigation
Project-specific and cumulative impacts related to noise and vibration would be less than significant.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.13 Noise
City of Bakersfield – SCH No. 2025101507 4.13-26
This page intentionally left blank.

City of Bakersfield – SCH No. 2025101507 4.14-1

4.14 Population and Housing
This section addresses any potential environmental impacts on population and housing that may result from the construction and operation of the proposed Riverview Marketplace Commercial Project (Project). This section analyzes the proposed Project’s effects on population, housing, and employment as compared to adopted growth forecasts within the geographical boundaries of the City of Bakersfield (City); and relevant policies and programs regarding planning for future development. While the Project does not include a residential component, development of the Project could indirectly induce population growth requiring the provision of additional housing within the City.

The analysis is based on a review of the relevant regulatory setting, existing conditions, and a discussion of the thresholds used to determine whether the Project would result in significant impacts to population and housing. Information in this section is based, in part, on the Metropolitan Bakersfield General Plan (General Plan), the Kern County Council of Governments Regional Transportation Plan/Sustainable Communities Strategy (RTP/SCS), U.S. Bureau of Labor Statistics and the U.S. Census.

During the scoping period for the Project’s Environmental Impact Report (EIR), no comments were received in response to the Notice of Preparation (NOP) regarding population and housing.

4.14.1 Regulatory Setting
Federal
Fair Housing Act (Title VIII of the Civil Rights Act of 1968, as amended) The federal Fair Housing Act (FHA) (42 U.S.C. Sections 3601-3631) prohibits discrimination in housing-related transactions and services. In general, it makes it unlawful to discriminate in the sale or rental of housing, in residential real estate-related transactions (including mortgage lending), and in the provision of services or facilities connected with housing, based on protected characteristics. The FHA is primarily administered by the U.S. Department of Housing and Urban Development (HUD), with additional enforcement authority in certain matters by the U.S.

Department of Justice (DOJ).

United States Census Bureau
The United States Census Bureau (U.S. Census Bureau) is a federal statistical agency in the U.S.

Department of Commerce responsible for producing official data about the people and economy of the United States. In practice, it conducts the decennial census (a count of every U.S. resident every 10 years, required by the Constitution) used for congressional apportionment and redistricting; runs major ongoing surveys like the American Community Survey (ACS) that provide annual estimates on population, housing, income, commuting, etc.; and produces economic and business statistics (e.g., the Economic Census) and publishes datasets/tools used widely in planning, policy, and research.

State
Government Code Sections 65583 and 65584(a)(1)
Section 65583 of the Government Code requires cities and counties to prepare a housing element as one of the state-mandated elements of the General Plan, with specific direction on its content.

Pursuant to Government Code Section 65584(a)(1), the California Department of Housing and Riverview Marketplace Commercial Project
Environmental Impact Report 4.14 Population and Housing City of Bakersfield – SCH No. 2025101507 4.14-2
Community Development (HCD) is responsible for determining the regional housing needs assessment (segmented by income levels) for each region’s planning body known as a “council of governments” (COG). HCD prepares an initial housing needs assessment and then coordinates with each COG in order to arrive at the final RHNA. To date, there have been five previous housing element update “cycles.” California is now in its sixth “housing-element update cycle.” Senate Bill 330 (2019)
On October 9, 2019, Governor Newsom signed into law the Housing Crisis Act of 2019 (Senate Bill [SB] 330). SB 330 seeks to speed up housing production in the next half decade by eliminating some of the most common entitlement impediments to the creation of new housing, including delays in the local permitting process and cities enacting new requirements after an application is complete and undergoing local review—both of which can exacerbate the cost and uncertainty that sponsors of housing projects face. In addition to speeding up the timeline to obtain building permits, the bill prohibits local governments from reducing the number of homes that can be built through down-planning or down-zoning or the introduction of new discretionary design guidelines.

The bill is in effect as of January 1, 2020, and would have expired on January 1, 2025, but is now extended until January 1, 2030, with the passage of SB 8.

Senate Bill 8 (2021)
Senate Bill (SB) 8, signed in 2021, extends and expands certain provisions of the Housing Crisis Act of 2019 (SB 330). SB 8 continues various measures intended to streamline housing approvals and limit new local actions that could reduce housing capacity during the extension period. SB 8 also includes accountability measures that expand and standardize housing production reporting, including requirements for jurisdictions to submit annual housing progress information and for HCD to make specified housing element and annual progress report information more accessible to the public.

Regional
Kern County Council of Governments
The Project site is located within the jurisdiction of the Kern County Council of Governments (Kern COG). Pursuant to federal and state law, Kern COG serves as the COG, a Regional Transportation Planning Agency (RTPA), and the Metropolitan Planning Organization (MPO) for Kern County (County). As the County’s regional planning agency for transportation, Kern COG is responsible for coordinating transportation planning and programming among its member jurisdictions and partner agencies. Kern COG prepares regional transportation planning documents (including the Regional Transportation Plan/Sustainable Communities Strategy [RTP/SCS]), supports regional transit and mobility planning efforts, and programs certain state and federal transportation funds for projects and services in the Kern region, while also coordinating with other agencies on related planning considerations such as air quality and growth forecasts as applicable.

While Kern COG’s direct responsibilities are transportation-focused, it still plays an important supporting role in housing planning because California’s housing outcomes are tightly linked to regional transportation planning, growth forecasts, and funding. As the region’s MPO/RTPA, Kern COG maintains demographic and land use inputs used in regional modeling (your document notes Kern COG’s use of land use and travel demand models). Those forecasts are often used as a baseline in local general plans, infrastructure planning, and CEQA analyses that touch housing and population.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.14 Population and Housing City of Bakersfield – SCH No. 2025101507 4.14-3
Through the RTP/SCS, Kern COG sets a regional strategy intended to integrate transportation investments with land use patterns. While Kern COG does not write local housing elements, the RTP/SCS can influence where housing growth is encouraged (e.g., near jobs, along transit), which can shape local housing policy and project planning. By programming certain federal/state transportation funds, Kern COG can advance infrastructure (transit, complete streets, corridors, first/last-mile) that supports housing feasibility and implementation, especially in planned growth areas.

Under state housing element law, the COG for a region is the entity that works with HCD on the Regional Housing Needs Assessment (RHNA) process (methodology, coordination, and allocation process, depending on the region’s structure). The RHNA is mandated by State Housing Element Law as part of the periodic process of updating general plan housing elements.

The RHNA quantifies the need for housing within each jurisdiction during specified planning periods, or cycles. In prior cycles, factors such as household growth and household income distribution were the primary factors considered in determining a jurisdiction’s RHNA allocation.

Local jurisdictions are required to plan and zone to accommodate their respective RHNA allocation (housing units) by income categories through the process of updating the Housing Elements of their General Plans. Communities use the RHNA in land use planning, prioritizing local resource allocation, and in deciding how to address identified existing and future housing needs resulting from population, employment, and housing unit growth. The RHNA does not necessarily encourage or promote growth, but rather allows communities to anticipate growth, so that collectively the region and sub region can grow in ways that enhance quality of life, improve access to jobs, promote transportation mobility, and address social equity and fair share housing needs.

Local
Metropolitan Bakersfield General Plan
The General Plan, dated December 2002, was updated in January 2016 per Resolution No. 018- 16, 019-16. At the time this EIR was published for public review, the City was in the process of updating its Bakersfield 2045 General Plan, but it has not yet been adopted. The General Plan includes goals, policies, and directions to achieve the City’s vision of the community and future development. The General Plan includes 12 elements that focus on: Land Use; Circulation; Housing; Conservation; Noise; Safety; Downtown Redevelopment; Public Services Facilities; Open Space; Parks; Kern River Plan; and Historical Resources.

The General Plan established the following goals, policies, and implementation programs in order to protect the City’s population growth and housing. At the end of each policy is listed in parentheses a code beginning with the letter “I” followed by a number. This code refers to the pertinent implementing program. The relevant implementing programs are also included below.

Land Use Element
LAND/GEN-G-1 Accommodate new development which captures the economic demands generated by the marketplace and establishes Bakersfield’s role as capital of the southern San Joaquin Valley.

LAND/GEN-G-2 Accommodate new development which provides a full mix of uses to support its population.

LAND/GEN-G-3 Accommodate new development which is compatible with and complements existing land uses.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.14 Population and Housing City of Bakersfield – SCH No. 2025101507 4.14-4
LAND/GEN-G-6 Accommodate new development that is sensitive to the natural environment, and accounts for environmental hazards.

LAND/CD-P-16 Allow for the development of a variety of commercial uses, including those which serve residents (groceries, clothing, etc.), highway users, and tourists-visitors
LAND/CD-P-19 Allow for the intensification and development of existing commercial areas in an infill fashion
LAND/GEN-P-78: Accommodate new projects which are infill or expansion of existing urban development.

LAND/GEN-P-79: Provide for an orderly outward expansion of new "urban" development (any commercial, industrial, and residential development having a density greater than one unit per acre) so that it maintains continuity of existing development, allows for the incremental expansion of infrastructure and public services, minimizes impacts on natural environmental resources, and provides a high quality environment for living and business.

4.14.2 Environmental Setting
Population
The Project Site is located within the City within the County of Kern (County). The City and County are relatively fast growing: over the ten years from 2012 to 2022, the City’s population increased at an annual rate of 1.4 percent per year and the County’s by 0.6 percent per year, significantly higher than the statewide growth rate of 0.3 percent per year. 1 The U.S. Census Bureau publishes statistics for all states, counties, and cities and towns with populations of 5,000 people or more. Based on the most recent U.S. Census Bureau (July 2024), the County’s population estimate is 922,529. This is an approximately 1.5 percent increase from the U.S. Census Bureau’s 2020 population estimate, which was 909,233.2 The City has also experienced notable population growth from 2020 to 2024. Based on the most recent U.S. Census Bureau (July 2024), the City’s population estimate is 417,468. This an approximately 3.2 percent increase from the U.S. Census Bureau’s 2020 population estimate for the City, which was 404,368.3
Both the County and the City are expected to see significant increases in population based on the Kern COG 2022 RTP/SCS growth trends. For the County, the population projections show a population increase to 1,076,000 in 2035; and 1,200,000 in 2046. For the City, population projections show a population increase to 507,400 in 2035; and 590,100 in 2046.4 Table 4.14-1, Population Projections for Kern County and the City of Bakersfield, summaries the historical and projected increases in population growth. 1 Placeworks. 2025. Urban Decay Analysis Technical Memorandum (Appendix J). Accessed March 2026. 2 United States Census Bureau. 2024. QuickFacts: Kern County, California. Available at:
https://www.census.gov/quickfacts/fact/table/kerncountycalifornia/PST045224. Accessed March 2026. 3 United States Census Bureau. 2024. QuickFacts: Bakersfield city, California. Available at:
https://www.census.gov/quickfacts/fact/table/kerncountycalifornia/PST045224. Accessed March 2026. 4 Kern Council of Governments. 2022. Regional Transportation Plan/Sustainable Communities Survey. Table 3-2 Growth Trends for Kern County and Selected Communities. Available at: https://www.kerncog.org/wp-content/uploads/2022/12/2022_RTP.pdf .

Accessed March 2026.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.14 Population and Housing City of Bakersfield – SCH No. 2025101507 4.14-5
Table 4.14-1: Population Projections for Kern County and the City of Bakersfield Location
2020
Population
2024
Population
2035
Population
2046
Population
Projected
population increase
(2020-2046)
%
Change
Kern County 909,233 922,529 968,371 1,200,000 290,767 32.0% City of
Bakersfield 404,368 417,468 507,400 590,100 185,732 45.9% Source: U.S. Census Bureau, 2024; Kern COG RTP/SCS, 2022.

Housing
In Metropolitan Bakersfield, approximately 80 percent of the new housing has been built on the west side, which breaks down to 40 percent north of the Kern River and another 40 percent in the southwest. With completion of a new water delivery system, the northeast has also seen activity.5 According to the Kern COG RTP/SCS, there will also be significant growth in households for both the County and the City. In 2020, the County had estimated 281,498 households. By 2046, that number will increase to 350,720 households. Similarly, the City had 127,864 households in 2020, which is estimated to increase to 174,100 by 2046. Table 4.14-2, Households in Kern County and the City of Bakerfield, identifies the total households in 2020 and projected households through 2046.

Table 4.14-2: Households in Kern County and the City of Bakerfield Location
2020
Households
2035
Households
2046
Households
Projected household
increase (2020-2046)
%
Change
Kern County 281,498 318,180 350,720 69,222 25.6%
City of
Bakersfield 127,864 151,700 174,100 46,236 36.2%
Source: Kern COG RTP/SCS, 2022.

As discussed above, the Kern COG is responsible for the County’s RHNA. According to the Kern COG 6
th Cycle RHNA Plan, the City accounts for approximately 65 percent of the County’s household growth. The RHNA Plan also quantifies the number of units required by income category for both the County and the City. Table 4.14-3, Kern County and City of Bakersfield 6 th Cycle RHNA, shows the RHNA for both jurisdictions through the end of the planning period, December 21, 2031. As shown in Table 4.14-3, the City’s RHNA is about 65 percent of the total RHNA for the County, consistent with estimated household growth.6, 7 Table 4.14-3: Kern County and City of Bakersfield 6
th Cycle RHNA
Location
Very-Low
Income Units
Low Income
Units
Moderate
Income Units
Above-Moderate
Income Units
Total RHNA
Allocation
Kern County 14,658 9,328 9,299 24,365 57,650
City of
Bakersfield 11,129 7,082 5,317 13,933 37,461
Source: Kern COG RHNA, 2023.
5 Kern Council of Governments. 2022. Regional Transportation Plan/Sustainable Communities Survey. Table 3-2 Growth Trends for Kern County and Selected Communities. Available at: https://www.kerncog.org/wp-content/uploads/2022/12/2022_RTP.pdf.

Accessed March 2026.
6 Kern Council of Governments. 2023. 6th Cycle Regional Housing Needs Allocation Plan, June 2023-December 2031. Available at:
https://www.kerncog.org/wp-content/uploads/2013/06/FINAL-Kern-COG-RHNA-Plan_07-22-22.pdf. Accessed March 2026. 7 Kern Council of Governments. 2023. Memorandum, Re: Rounding Error Adjustments to the 6th Cycle RHNA Allocation Plan Requested by HCD - 12/22/22. Available at: https://www.kerncog.org/wp-content/uploads/2023/02/RHNA-Adjust-Memo-Webpage.pdf. Accessed March 2026.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.14 Population and Housing City of Bakersfield – SCH No. 2025101507 4.14-6
Employment
According to the Kern COG RTP/SCS, employment will keep pace with population for both the County and the City. In 2020, the County had estimated 334,800 employment opportunities, which will increase to 395,110 by 2046. The City had 143,449 employment opportunities in 2020, which is estimated to increase to 181,200 by 2046. Table 4.14-4, Employment in Kern County and the City of Bakerfield identifies the total employment in 2020 and projected employment through 2046.

Table 4.14-4: Employment in Kern County and the City of Bakerfield Location
2020
Employment
2035
Employment
2046
Employment
Projected employment
increase (2020-2046)
%
Change
Kern County 334,800 374,780 395,110 60,310 18.0%
City of
Bakersfield 143,449 166,100 181,200 37,751 26.3%
Source: Kern COG RTP/SCS, 2022.

According to the U.S Census Bureau, approximately 58.5% of the population within the City is in the workforce as of 2024. The U.S. Bureau of Labor Statistics provides data for the Bakersfield-Delano, CA area on both the total labor force and the unemployment rate. As of December 2025, Bakersfield-Delano had a labor force of about 416,300 persons, of which approximately 381,600 persons were employed and approximately 34,600 persons were unemployed. As such, approximately 8.3 percent of the workforce is unemployed.8

4.14.3 Impact Analysis
Methodology
Effects to population and housing associated with the Project were evaluated employing data provided by the U.S. Census Bureau, Kern COG, and the California Department of Finance, as well as local land use policies.

Thresholds of Significance
The City utilizes the California Environmental Quality Act (CEQA) Guidelines, Appendix G, and thresholds of significance9to analyze the environmental impacts of the Project. Per CEQA Guidelines, an impact is considered significant if the Project would:
• Induce substantial unplanned population growth in an area, either directly (for example, by proposing new homes and businesses) or indirectly (for example, through extension of roads or other infrastructure).
• Displace substantial numbers of existing people or housing, necessitating the construction of replacement housing elsewhere.
8 United States Department of Labor Statistics. 2025. Western Information Office. Bakersfield-Delano, CA Economy at a Glance.

Available at: https://www.bls.gov/regions/west/ca_bakersfield_msa.htm#eag_ca_bakersfield_msa.f.3. Accessed March 2026. 9 Association of Environmental Professionals (AEP). 2025. CEQA Guidelines Appendices, Appendix G: Environmental Checklist Form. Available at: https://www.califaep.org/docs/CEQA_Handbook_2025combined.pdf. Accessed January 2026.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.14 Population and Housing City of Bakersfield – SCH No. 2025101507 4.14-7
Project Impacts
Threshold POP-1: Would the project induce substantial unplanned population growth in an area, either directly (for example, by proposing new homes and businesses) or indirectly (for example, through extension of roads or other infrastructure)?
Impact Analysis
Growth can be induced directly (e.g., by building new homes or businesses, or by creating new jobs), or indirectly (e.g., by removing obstacles to growth, such as through the extension of infrastructure). The Project proposes the development of a commercial retail center and does not include a residential component that would result in an increase of residents and population within the City. As such, the Project would not directly induce population growth.

Indirectly, the Project does not propose the extension of roads or existing infrastructure that would result in indirect growth within the City. However, the Project could result in a significant impact if the Project creates employment opportunities that would require workers to move to the City resulting in unplanned population growth. The Project is expected to require 969 employees.

Although operation of the Project would provide employment opportunities in the local area, the Project would not require a specialized labor force that would draw large numbers of new employees to the area. Based on the existing unemployment rates in the City and County, any new employees would already be located within the City limits and would not relocate to the Bakersfield area specifically to obtain jobs associated with the Project. As discussed above, the region has an unemployment rate of approximately 8.3 percent (34,600 persons) according to the U.S. Bureau of Labor Statistics. Thus, employees would likely be drawn from the existing population. Therefore, an increased demand for housing to accommodate workers would not occur due to Project operations. Impacts would be less than significant and no mitigation is required.

Mitigation Measures
None required.

Level of Significance After Mitigation
Less than significant impact. No mitigation is required.

Threshold POP-2: Would the project displace substantial numbers of existing people or housing, necessitating the construction of replacement housing elsewhere?
Impact Analysis
The Project Site is located the northwestern portion of the City. The Project Site is an approximately 46.16-acre undeveloped L-shaped property situated along the south side of Rosedale Highway (CA-58), north of the railroad tracks, west of Coffee Road, and east of El Toro Viejo Road. The Project Site is located on a portion of a larger property formerly occupied by the PG&E Kern Power Plant. There is no existing housing on the Project Site. The Project proposes to transform an underutilized site into an active infill commercial center that would create economic, retail and service opportunities in an area served with existing infrastructure and public services. The Project Site is surrounded by existing commercial uses to the north, west, and east.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.14 Population and Housing City of Bakersfield – SCH No. 2025101507 4.14-8
The General Plan land use designation of the Project Site is P (Public Facilities). The Project Site is zoned M-2 (General Manufacturing). The Project applicant is seeking an amendment to the City’s General Plan, changing the Project Site’s designation from P (Public Facilities) to LI (Light Industrial), to facilitate the Project Site’s proposed use and create alignment with the Project Site’s` M-2 zoning designation, which under the City’s stacked zoning code allows, by right, all uses permitted under the commercial designations. Therefore, to proceed with the Project and its proposed uses and to provide consistency with the Project site’s M-2 zoning designation, the LI designation has been determined to be the appropriate land use designation. As such, the Project Site is not zoned for residential development. As such, the Project would not displace existing people. As discussed, under Impact POP-1, all construction workers and employees are expected to be local and as such no additional housing would be required. As such, impacts would be less than significant and no mitigation is required.

Mitigation Measures
None required.

Level of Significance After Mitigation
Less than significant impact. No mitigation is required.

Cumulative Impacts
Section 3.3, Cumulative Development, identifies projects that are planned, under construction, or have been recently completed. A summary of these projects is provided in Table 3-1, Cumulative Projects List. Potential cumulative impacts would occur if the proposed Project in combination with the identified cumulative projects would result in significant effects to Population and Housing. For purposes of this analysis, the geographic scope would be the City.

As discussed above, the Project would not induce substantial population growth within the City.

The Project would not include components such as the extension of roads or existing infrastructure that would result in indirect growth within the City. Furthermore, the Project Site does not provide housing, nor would development of the Project site result in displacement of people or housing.

Table 4.12-1, Population Projections for Kern County and the City of Bakersfield, identifies projected increases in population growth. Similarly, Kern COG estimates that employment opportunities will grow to 11.9 percent and 15.8 percent in the County and City, respectively, by 2035, less than 8 years after the Project is expected to be operational in early 2028. Moreover, the region has an unemployment rate of approximately 8.3 percent (34,600 persons) according to the U.S. Bureau of Labor Statistics. Therefore, as further discussed under Impact POP-1, the Project’s demand for employment would be met from the City’s existing unemployed persons and the projected increases in population growth. The employment opportunities generated by the Project would also be consistent with the expected growth in the region. The employment opportunities created by the Project accounts for 4.3 percent of the total growth expected by 2035.

Furthermore, the proposed Project will serve an existing demand for employment that will result from the City’s projected future population, providing employment opportunities for the City and the surrounding community. Therefore, implementation of the proposed Project would not result in a cumulatively significant population or housing impact, and cumulative impacts from related projects are considered less than significant.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.14 Population and Housing City of Bakersfield – SCH No. 2025101507 4.14-9
Mitigation Measures
No mitigation measures are required as impacts would be less than significant.

Level of Significance After Mitigation
Not applicable. Project-specific and cumulative impacts related to population and housing would be less than significant.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.14 Population and Housing City of Bakersfield – SCH No. 2025101507 4.14-10
This page intentionally left blank.

City of Bakersfield – SCH No. 2025101507 4.15-1

4.15 Public Services and Recreation
This section discusses any potential environmental impacts associated with public services and recreation that may result from implementation of the proposed Riverview Marketplace Commercial Project (Project). Potential effects are evaluated based on the Project’s potential to result in substantial adverse physical impacts associated with the provision of new or physically altered governmental facilities, need for new or physically altered governmental facilities, the construction of which could cause significant environmental impacts for any of the public services (i.e., fire protection, police protection, schools, and other public facilities (e.g., library facilities)).

Additionally, this section also evaluates potential effects based on the Project’s potential to increase the use of existing neighborhood and regional parks or other recreational facilities such that substantial physical deterioration of the facility would occur or be accelerated or include recreational facilities or require the construction or expansion of recreational facilities which might have an adverse physical effect on the environment.

The analysis is based on a review of the relevant regulatory setting, existing conditions, and a discussion of the thresholds used to determine whether the Project would result in significant impacts to public services and recreation. Information in this section is based, in part, on the Metropolitan Bakersfield General Plan (General Plan) and the City of Bakersfield (City) Municipal Code (BMC) Title 17 (Zoning Ordinance).

During the scoping period for the Project’s Environmental Impact Report (EIR), no comments were received in response to the Notice of Preparation (NOP) regarding public services and recreation.

4.15.1 Regulatory Setting
Federal
No specific federal regulations apply to public services and recreation associated with the Project.

State
California Building Standards Code
The State of California updates its building standards, also known as the California Code of Regulations (CCR), Title 24, every three years. These codes establish uniform standards for construction and maintenance. The current code in effect is the 2025 California Building Standards Code.

California Fire Code
The California Fire Code (CFC) (24 CCR Part 9), which is part of the California Building Standards Code, is the 2025 edition and took effect on January 1, 2026. It is based on the 2024 International Fire Code (IFC) with California-specific amendments, covering fire safety, building standards, and Wildland-Urban Interface (WUI) regulations. The CFC contains regulations consistent with nationally recognized and accepted practices for safeguarding life and property from the hazards of:
• Fire and explosion;
• Dangerous conditions arising from the storage, handling, and use of hazardous materials and devices; and
Riverview Marketplace Commercial Project
Environmental Impact Report 4.15 Public Services and Recreation City of Bakersfield – SCH No. 2025101507 4.15-2
• Hazardous conditions in the use or occupancy of buildings or premises.

Specifically, the CFC sets forth regulations regarding building standards, fire protection and notification systems, fire protection devices such as fire extinguishers and smoke alarms, high-rise building standards, and fire suppression training. It contains regulations relating to construction, maintenance, and use of buildings. Topics addressed in the code also include fire department access, fire hydrants, automatic sprinkler systems, fire alarm systems, fire and explosion hazards safety, hazardous materials storage and use, provisions intended to protect and assist fire responders, industrial processes, and many other general and specialized fire-safety requirements for new and existing buildings and the surrounding premises. The CFC also contains provisions to assist emergency response personnel. These fire-safety-related building standards are referenced in other parts of Title 24. Development under the Project would be subject to applicable and most current adopted regulations of the CFC.

California Occupational Safety and Health Administration In accordance with CCR, Title 8, Section 1270 “Fire Prevention,” and Section 6773, “Fire Protection and Fire Equipment,” the California Occupational Safety and Health Administration (Cal/OSHA) has established minimum standards for fire suppression and emergency medical services. The standards include, but are not limited to, guidelines on the handling of highly combustible materials, fire hose sizing requirements, restrictions on the use of compressed air, access roads, and the testing, maintenance, and use of all firefighting and emergency medical equipment.

Mitigation Fee Act (California Government Code §§ 66000 through 66008) The Mitigation Fee Act (MFA) allows local agencies to establish fees that will be imposed on new development projects to mitigate the impact on the jurisdiction’s ability to provide specified public facilities to serve proposed development projects. The MFA requires a local agency, such as the City before establishing, increasing, or imposing an impact fee as a condition of development, to identify the purpose of the fee and the use to which the fee is to be put. The agency must also demonstrate a reasonable relationship between the fee and the purpose for which it is charged, and between the fee and the type of development project on which it is to be levied. The MFA became enforceable on January 1, 1989.

In order to comply with the MFA, a jurisdiction must follow four requirements:
1) Make certain determinations regarding the purpose and use of a fee and establish a nexus or connection between a development project or class of project and the public improvement being financed with the fee;
2) Segregate fee revenue from the general fund in order to avoid commingling of capital facilities fees and general funds;
3) For fees that have been in the possession of the jurisdiction for five years or more and for which the dollars have not been spent or committed to a project, the jurisdiction must make findings each fiscal year describing the continuing need for the money; and 4) Refund any fees with interest for which the findings noted above cannot be made.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.15 Public Services and Recreation City of Bakersfield – SCH No. 2025101507 4.15-3
Senate Bill (SB) 50, California Government Code § 65995(b), and Education Code § 17620 SB 50 (the Leroy F. Greene School Facilities Act of 1998), adopted in 1998, defined the school impact fee needs analysis process in California Government Code (CGC) Sections 65995.5– 65998. Pursuant to its provisions, school districts may collect fees to offset the costs associated with increasing school capacity as a result of development. By statute, payment of a statutory fee by developers serves as the total mitigation of the potential impact of a development on school facilities pursuant to CEQA. SB 50 places limitations on the power of local governments to require mitigation of school facilities by developers. Under the provisions of SB 50, fees are determined based on the square footage of proposed uses. As a part of SB 50, school districts must base their long-term facilities needs and costs on long-term population growth in order to qualify for this source of funding. Prior to SB 50, case law allowed cities to consider and impose conditions to mitigate impacts of new development on school facilities.

SB 50 amended CGC Section 65995, which contains limitations on Education Code Section 17620, the statute that authorizes school districts to assess development fees within school district boundaries. CGC § 65995(b)(3) requires the maximum square footage assessment for development to be increased every two years, according to inflation adjustments.

According to CGC Section 65995(3)(h), the payment of statutory fees is “deemed to be full and complete mitigation of the impacts of any legislative or adjudicative act, or both, involving, but not limited to, the planning, use, or development of real property, or any change in governmental organization or reorganization...on the provision of adequate school facilities.” The school district is responsible for implementing the specific methods for mitigating school impacts under the CGC.

Assembly Bill (AB) 97
Approved in July 2013, AB 97 revises existing regulations related to financing for public schools, by requiring State funding for county superintendents and charter schools that previously received a general-purpose entitlement. AB 97 authorizes local educational agencies to spend, for any local educational purpose, the funds previously required to be spent for specified categorical education programs, including, among others, programs for teacher training and class size reduction.

The Quimby Act
The Quimby Act (CGC Section 66477) was established by the California legislature in 1965 to develop new or rehabilitate existing neighborhood or community park or recreation facilities. This legislation was enacted in response to the need to provide parks and recreation facilities for California’s growing communities. The Quimby Act gives the legislative body of a city or county the authority, by ordinance, to require the dedication of land or payment of in-lieu fees, or a combination of both, for park and recreational purposes as a condition of approval of a tract map or parcel map.

Local
Metropolitan Bakersfield General Plan
The General Plan, dated December 2002, was updated in January 2016 per Resolution No. 018- 16, 019-16. At the time this EIR was published for public review, the City was in the process of updating its Bakersfield 2045 General Plan, but it has not yet been adopted. The General Plan includes goals, policies, and directions to achieve the City’s vision of the community and future development. The General Plan includes 12 elements that focus on: Land Use; Circulation; Riverview Marketplace Commercial Project
Environmental Impact Report 4.15 Public Services and Recreation City of Bakersfield – SCH No. 2025101507 4.15-4
Housing; Conservation; Noise; Safety; Downtown Redevelopment; Public Services Facilities; Open Space; Parks; Kern River Plan; and Historical Resources.

The General Plan established the following goals, policies, and implementation programs in order to protect the City’s public services and recreational facilities. At the end of each policy is listed in parentheses a code beginning with the letter “I” followed by a number. This code refers to the pertinent implementing program. The relevant implementing programs are also included below.

Land Use Element
LU/PF-P-50 Coordinate with the appropriate agencies so that adequate land and facilities are set aside for schools, parks, police/fire, libraries, cultural facilities, recreational facilities, and other service uses to serve the community (I-2).

LU/PF-P-54 The developer shall be responsible for all on-site costs incurred as a result of the proposed project, in addition to a proportional share of off-site costs incurred in service extension or improvements. The availability of public or private services or resources shall be evaluated during discretionary project consideration. Availability may affect project approval or result in a reduction in size, density, or intensity otherwise indicated in the general plan's map provisions (I-6, I-11).

LU/G-P-79 Provide for an orderly outward expansion of new "urban" development (any commercial, industrial, and residential development having a density greater than one unit per acre) so that it maintains continuity of existing development, allows for the incremental expansion of infrastructure and public services, minimizes impacts on natural environmental resources, and provides a high quality environment for living and business (I-11).

Safety Element
SAF/PS-G-1 Ensure that Bakersfield metropolitan area maintains a high level of public safety for its citizenry.

SAF/PS-G-2 Ensure that adequate police and fire services and facilities are available to meet the needs of current and future metropolitan residents through the coordination of planning and development of metropolitan police and fire facilities and services.

SAF/PS-G-3 Provide for the coordinated planning and development of service areas for police and fire protection to ensure an equitable burden of responsibility between County and City in Metropolitan Bakersfield.

SAF/PS-G-4 Assure that fire, hazardous substance regulation and emergency medical service problems are continuously identified and addressed in a proactive way, in order to optimize safety and efficiency.

SAF/PS-P-2 Require discretionary projects to assess impacts on police and fire services and facilities.

SAF/PS-P-9 Restrict, after appropriate public hearings, the use of fire-prone building materials in areas defined by the fire services as presenting high-conflagration risk.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.15 Public Services and Recreation City of Bakersfield – SCH No. 2025101507 4.15-5
Parks Element
PARKS-G-1 Provide parks and recreation facilities to meet the planning area's diverse needs.

PARKS-G-2 Supply neighborhood parks at a minimum of 2.5 acres per 1,000 persons throughout the plan area.

PARKS-G-3 Provide four acres of park and recreation space for each 1,000 persons (based on the most recent census) for general regional recreation opportunity as a minimum standard. Park and recreational space includes mini-parks, neighborhood parks, community parks and regional parks.

PARKS-G-7 Require that the costs of park and recreation facilities and programs are borne by those who benefit from and contribute to additional demand.

PARKS-P-1 Require that neighborhood parks be developed at a minimum rate of 2.5 acres per 1,000 population. This requirement may be met all or in part by on-site recreation for such developments as Planned Unit Developments.

The City of Bakersfield may allow credit to meet the neighborhood parks requirement.

PARKS-P-3 Require developers to dedicate land, provide improvements and/or in-lieu fees to serve the needs of the population in newly developing areas.

City of Bakersfield and Kern County Joint Powers Agreement Since 1980, the City and the County have had a Joint Powers Agreement (JPA) for fire protection services, allowing both the Bakersfield Fire Department (BFD) and the Kern County Fire Department (KCFD) to be able to assist each other in responding to calls for help. The JPA between the County and the City requires the closest fire station within the Metropolitan Bakersfield area to respond to the call, whether it occurs in the City or the County and regardless of which jurisdiction maintains and staffs the station. Each agency provides comparable services.1 North of the River Recreation and Park Master Plan
The North of the River Recreation and Park District (NOR) adopted the current Recreation and Park Master Plan 2010-2020 (NOR Master Plan) on June 20, 2011, per Board Resolution 25-11.

The NOR park system includes a series of parks classified as community parks, neighborhood parks and mini parks. The NOR Master Plan is intended to be a policy document and to give long range direction to assist in the provision of facilities and services to this rapidly growing area.

4.15.2 Environmental Setting
Fire Protection
The BFD provides emergency medical services, fire suppression, hazardous materials mitigation, vehicle and technical rescue, water rescue, and other life safety services to the City.2 As previously discussed, BFD has a JPA with KCFD in which the agency with the closest fire station 1 Kern Local Agency Formation Commission. 2026. Committee on City Annexations FAQs. Available at:
https://www.kernlafco.org/committee-on-city-annexations-faqs. Accessed February 2026. 2 City of Bakersfield. 2026. Departments, Fire. About the Fire Department webpage. Available at:
https://www.bakersfieldcity.us/252/About-the-Fire-Department. Accessed February 2026.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.15 Public Services and Recreation City of Bakersfield – SCH No. 2025101507 4.15-6
will respond to the call for service regardless of the jurisdiction.3 The BFD maintains 14 fire stations within the City which are located throughout the 151 square mile service area, serving over 385,000 residents.4 With 240 sworn, support, and reserve personnel, BFD’s response time goal for dispatch, turnout, and travel is approximately six minutes and 59 seconds or less 90 percent of the time. Between 2018 and 2020, BFD met the following service level performance standards:
• Low Risk Fire Service Calls: For 90 percent of all fires, the total response time for the arrival of the first due suppression apparatus, staffed with a minimum of 1 captain, 1 engineer, and 1 firefighter is 11 minutes and 55 seconds in all areas, compared to the goal of seven minutes and 19 seconds.
• Moderate Risk Fire Service Calls: For 90 percent of all moderate risk fires, the total response time for the arrival of the ERF staffed with at least 10 firefighters and officers, is 13 minutes and 16 seconds in all areas, compared to the goal of seven minutes and 19 seconds.
• High Risk Fire Service Calls: For 90 percent of all high-risk fires, the total response time for the arrival of the ERF staffed with 18 firefighters and officers is 25 minutes and 46 seconds in all areas, compared to the goal of seven minutes and 19 seconds. 5 KCFD’s total organization consists of over 621 permanent employees, serving a service area of over 8,000 square miles comprised of nine cities, 41 communities, and a population of over 922,000 residents. Specifically, over 521 uniformed firefighters are stationed at KCFD’s 47 stations. KCFD also has a goal response time of approximately 7 minutes. Between 2018 and 2020, BFD and KCFD had the following combined service level performance standards:
• Low Risk Fire Service Calls: an average of 12 minutes and 15 seconds compared to the target of seven minutes and 19 seconds.
• Moderate Risk Fire Service Calls: an average of 12 minutes and 27 seconds compared to the target of seven minutes and 19 seconds.
• High Risk Fire Service Calls: an average of 12 minutes and 42 seconds compared to the target of seven minutes and 19 seconds.

The closest station to the Project Site is KCFD Station 65, Greenacres Station, located at 10051 Meacham Road, approximately 0.93 miles northwest of the Project Site. KCFD Station 66, Landco Station, is also in close proximity to the Project Site, located at 3000 Landco Drive, approximately

1.93 miles east of the Project Site.6 As such, calls for service from the Project site would be addresses by KCFD.
3 Kern Local Agency Formation Commission. 2026. Committee on City Annexations FAQs. Available at:
https://www.kernlafco.org/committee-on-city-annexations-faqs. Accessed February 2026. 4 Bakersfield Fire Department. 2021. Bakersfield Strategic Plan 2021-2026. Available at:
https://content.civicplus.com/api/assets/ca-bakersfield/d34299e7-7bf8-479a-8321-2ad5c2fb35e5?cache=1800. Accessed February 2026.
5 Bakersfield Fire Department. 2021. Community Risk Assessment – Standards of Cover. Available at:
https://content.civicplus.com/api/assets/ca-bakersfield/3fe1d3d6-267b-457d-974a-792cc1eeda35?cache=1800. Accessed February 2026.
6 City of Bakersfield. 2026. Departments, Fire. Locate Fire Stations GIS portal. Available at:
https://cob.maps.arcgis.com/apps/webappviewer/index.html?id=8c056dff7b2f45b6916f15f7caa7f15c Accessed February 2026.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.15 Public Services and Recreation City of Bakersfield – SCH No. 2025101507 4.15-7
Police Protection
The Bakersfield Police Department (BPD) provides public safety and law enforcement services for the City and the Project Site. BPD’s service area extends over 150 miles, serving approximately 400,000 people. BPD has two locations for public services: the BPD headquarters at 1601 Truxtun Avenue, downtown Bakersfield, and BPD West Substation at 1301 Buena Vista Road, operated by over 600 employees.7 The Project Site is located approximately 2.8 miles northeast of the West Substation. BPD provides service to six zones within their service area:

North, Central, South, Hill, Metro, and Valley.

During 2022, BPD handled approximately 745,000 calls for service, with 271,000 being 911 calls of which approximately 258,000 resulted in dispatch. For all service calls, a service priority number one through nine is assigned to the call, one being emergency calls. According to BPD, the median response time in 2022 for Priority 1 (emergency calls) dropped from a little over seven minutes, to around six minutes and 52 seconds. The response time for Priority 2 (urgent calls) has an average of 36 minutes in 2022.
8 BFD also has a partnership with the California Highway Patrol (CHP) and the Kern County’s Sheriff’s Office (KCSO) to address specific issues within the City. Through this partnership, CHP expanded its presence in the City and addresses cases of auto theft, retail crime and traffic enforcement. KCSO assists in addressing roadway violence and criminal activity.9 Schools
The Project Site is located in the Fruitvale School District (FSD), which is located in northwest portion of the City. FSD includes Columbia Elementary, Discovery Elementary, Endeavour Elementary, Quailwood Elementary and Fruitvale Junior High Schools, and has a current TK-grade 8 enrollment of 3,062 students. Specifically, the Project Site is located within the Columbia Elementary School boundary, located at 703 Mondavi Way and approximately 0.89 miles southwest of the Project, and the Fruitvale Junior High School boundary, located at 2114 Calloway Drive and approximately 0.45 miles west of the Project Site.10 The Project Site is also within the school boundaries for Liberty High School, located at 925 Jewetta Avenue and approximately 1.68 miles southwest of the Project Site.11 Liberty High School is part of the Kern High School District (KHSD), which is California’s largest grades 9-12 high school district serving over 42,000 students.12
Parks
North of the River Recreation and Park District (NOR) plans, organizes and conducts a wide variety of park and recreation programs within the designated NOR boundaries, which includes the Project Site. NOR is 215 square miles in size, has a population of 125,000 residents, and encompasses five school districts. NOR maintains 24 park sites totaling 269.8 developed acres 7 Bakersfield Police Department. 2026. Inside BPD webpage. Available at: https://joinbpd.us/inside-bpd, Accessed February 2026. 8 Bakersfield Now. 2023. Bakersfield Police Department break down response times. Available at:
https://bakersfieldnow.com/news/local/bakersfield-police-department-breaks-down-response-times. Accessed February 2026. 9 KGET.com. 2024. CHP-Bakersfield PD crime suppression partnership expands to include Kern County Sheriff’s Office. Available at: https://www.kget.com/news/local-news/chp-bakersfield-pd-crime-prevention-partnership-expands-to-include-kern-county-sheriffs-office/. Accessed February 2026. 10 Fruitvale Schools District. 2026. District & School Boundaries Map. Available at:
https://1.cdn.edl.io/zvrE010AY3pDw5rMUmBUuq4ANUtkm0KjJ5o56ghSNFTWFiVT.pdf. Accessed February 2026. 11 Kern High School District. 2025. Kern High School District Attendance Boundaries. Available at:
https://4.files.edl.io/9823/08/13/25/162531-7107f99b-35ca-4dc6-8fae-6b121ea94130.pdf. Accessed February 2026. 12 Kern High School District. 2026. About Us webpage. Available at: https://www.kernhigh.org/apps/pages/aboutus. Accessed February 2026.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.15 Public Services and Recreation City of Bakersfield – SCH No. 2025101507 4.15-8
within its service boundaries.13 The NOR Master Plan indicates that NOR’s standard is to provide two acres per 1,000 population developed as neighborhood parks, and one acre per 1,000 developed as community parks for a total of three acres. 14 Libraries
The Kern County Library provides a full range of services and resources to over 850,000 people in every city within Kern County and unincorporated area of Kern County through a network of 22 physical locations operated by Kern County Library Headquarters. Within the Bakersfield area, Kern County Library operates seven branches. The closest branch to the Project Site is the Southwest Branch Library, located at 8301 Ming Avenue, approximately 2.6 miles southeast of the Project Site.15

4.15.3 Impact Analysis
Methodology
The analysis qualitatively assessed the potential of the Project to negatively affect public services.

Data on existing fire and police operations and performance was collected from data made publicly available by the BFD, KCFD, BPD, and the City. Information on schools, parks, and other public services was collected from publicly available data provided by FSD, KHSD, NOR, Kern County Library and the City.

Thresholds of Significance
Public Services
The City utilizes the California Environmental Quality Act (CEQA) Guidelines, Appendix G, and thresholds of significance16 to analyze the environmental impacts of the Project. Per CEQA Guidelines, an impact is considered significant if the Project would:
• Result in substantial adverse physical impacts associated with the provision of new or physically altered governmental facilities, need for new or physically altered governmental facilities, the construction of which could cause significant environmental impacts, in order to maintain acceptable service ratios, response times, or other performance objectives for any of the public services:
▪ Fire protection.
▪ Police protection.
▪ Schools.
▪ Parks.
▪ Other public facilities.
13 North of the River Recreation and Parks District. 2026. Service Area Map. Available at: https://www.norfun.org/service-area-map.

Accessed February 2026.
14 North of the River Recreation and Parks District. 2011. Recreation and Park Master Plan. Available at:
https://norfun.specialdistrict.org/files/162ebc44d/NOR+Master+Plan+2010-2020.pdf. Accessed February 2026. 15 Kern County Library. 2026. Hours & Locations, Branches & Bookmobile webpage. Available at: https://kerncountylibrary.org/find-hours-locations/. Accessed February 2026. 16 Association of Environmental Professionals (AEP). 2025. CEQA Guidelines Appendices, Appendix G: Environmental Checklist Form. Available at: https://www.califaep.org/docs/CEQA_Handbook_2025combined.pdf. Accessed January 2026.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.15 Public Services and Recreation City of Bakersfield – SCH No. 2025101507 4.15-9
Recreation
Per CEQA Guidelines, an impact is considered significant if the Project would:
• Increase the use of existing neighborhood and regional parks or other recreational facilities such that substantial physical deterioration of the facility would occur or be accelerated.
• Include recreational facilities or require the construction or expansion of recreational facilities which might have an adverse physical effect on the environment.

Project Impacts
Threshold PUB-1: Would the project result in substantial adverse physical impacts associated with the provision of new or physically altered governmental facilities, need for new or physically altered governmental facilities, the construction of which could cause significant environmental impacts, in order to maintain acceptable service ratios, response times, or other performance objectives for fire protection?
Impact Analysis
As previously discussed, BFD and KCFD have a JPA in which both agencies take service calls depending on proximity to the service call. The closest station to the Project Site is KCFD Station 65, Greenacres Station, located at 10051 Meacham Road, approximately 0.93 miles northwest of the Project Site. As such, the Project would most likely be served by KCFD.

Project development and operation would result in an incremental increase in demand for fire protection services. However, as a proposed commercial development with no residential component, the Project is unlikely to have a substantial effect on the existing ratio of firefighters to residents and would result in a less than significant increase on the demand for fire protection services. Additionally, the Project would be constructed pursuant to CFC requirements and industry standards that include regulatory requirements that would aid in fire safety and support fire suppression activities, such as a fire protection system, automatic fire sprinklers, paved access, and required aisle widths that would be subject to review by KCFD. Further, the Project would be subject to applicable development impact fees relating to fire protection. This would allow the fire department to offset any increased demand that may result from the Project.

Accordingly, the Project would not result in the need for new or physically altered fire protection facilities, and any impact to fire protection would be less than significant.

Mitigation Measures
None required.

Level of Significance After Mitigation
Less than significant with no mitigation required.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.15 Public Services and Recreation City of Bakersfield – SCH No. 2025101507 4.15-10
Threshold PUB-2: Would the project result in substantial adverse physical impacts associated with the provision of new or physically altered governmental facilities, need for new or physically altered governmental facilities, the construction of which could cause significant environmental impacts, in order to maintain acceptable service ratios, response times, or other performance objectives for police protection?
Impact Analysis
Police facilities and services are provided by the BPD. The Project Site is located approximately

2.8 miles northeast of the BPD West Substation. As described above, CHP and the KCSO also assist BPD to address specific crime and public safety issues.

As a commercial development, the Project development and operation could result in an incremental increase in demand for police protection services as the development would draw new customers and visitors to the Project that could result in increased amount of police demand.

However, it is likely that individual stores would include security and anti-theft measures that would reduce calls for service. Therefore, it is unlikely the proposed Project would generate the number of calls necessary to negatively affect service ratios, response times, or other police department performance objectives. Additionally, the Project would also be subject to applicable development impact fees that would fund police services and facilities to meet future demand.

Accordingly, the Project would not result in the need for new or physically altered police department facilities, and any impact to police protection would be less than significant.

Mitigation Measures
None required.

Level of Significance After Mitigation
Less than significant with no mitigation required.

Threshold PUB-3: Would the project result in substantial adverse physical impacts associated with the provision of new or physically altered governmental facilities, need for new or physically altered governmental facilities, the construction of which could cause significant environmental impacts, in order to maintain acceptable service ratios, response times, or other performance objectives for schools?
Impact Analysis
Generally, projects that induce population growth, such as the construction of new housing, result in an increased demand on schools. The proposed Project would develop a commercial development and would not require development of new housing. It is anticipated that future employees of the proposed Project would reside within the City and immediately surrounding area. Therefore, the proposed Project is not anticipated to result in substantial, unplanned population growth.

The State of California requires payment of development impact fees to mitigate project impacts to school facilities (CGC Section 65996; SB 50). All new residential, commercial, and industrial construction and/or an addition of covered or enclosed space are subject to the collection of Riverview Marketplace Commercial Project
Environmental Impact Report 4.15 Public Services and Recreation City of Bakersfield – SCH No. 2025101507 4.15-11
developer fees. This fee is determined by the square footage of assessable space, which is measured from the perimeter of the structure. These fees pay for facility expansion and upgrades needed to serve new students. It is not anticipated that the proposed Project would generate any new students nor increase demand for school services. Moreover, payment of impact fees in compliance with State law would mitigate any impacts to school facilities. Therefore, impacts would be less than significant.

Mitigation Measures
None required.

Level of Significance After Mitigation
Less than significant with no mitigation required.

Threshold PUB-4: Would the project result in substantial adverse physical impacts associated with the provision of new or physically altered governmental facilities, need for new or physically altered governmental facilities, the construction of which could cause significant environmental impacts, in order to maintain acceptable service ratios, response times, or other performance objectives for parks?
Impact Analysis
As previously discussed, the Project Site is within the NOR district. The Project is non-residential, and it is anticipated that future employees of the Project would reside within the City and immediately surrounding area. It is anticipated that future employees would continue to use park facilities near their homes and use of parks or other recreational facilities close to the Project site would be nominal. Accordingly, the Project is not anticipated to affect service ratios, response times, or other performance objectives for parks and would not require the construction of any new or altered park facility. Therefore, impacts to parks would be less than significant.

Mitigation Measures
None required.

Level of Significance After Mitigation
Less than significant with no mitigation required.

Threshold PUB-5: Would the project Result in substantial adverse physical impacts associated with the provision of new or physically altered governmental facilities, need for new or physically altered governmental facilities, the construction of which could cause significant environmental impacts, in order to maintain acceptable service ratios, response times, or other performance objectives for other services?
Impact Analysis
Other public facilities typically pertain to services such as public libraries. Kern County Library operates the libraries in close proximity to the Project Site, including the Southwest Branch Library, located at 8301 Ming Avenue, approximately 2.6 miles southwest of the Project Site. As Riverview Marketplace Commercial Project
Environmental Impact Report 4.15 Public Services and Recreation City of Bakersfield – SCH No. 2025101507 4.15-12
discussed, it is anticipated that future employees of the proposed Project would reside within the City and immediately surrounding area. The Project would not result in substantial unplanned population growth, affecting service ratios, response times, or other performance objectives for other services such as libraries. Therefore, impacts to other services would be less than significant.

Mitigation Measures
None required.

Level of Significance After Mitigation
Less than significant with no mitigation required.

Threshold REC-1: Would the project increase the use of existing neighborhood and regional parks or other recreational facilities such that substantial physical deterioration of the facility would occur or be accelerated? Impact Analysis
Increase in the demand for existing neighborhood and regional parks or other recreational facilities typically occurs due to an increase in the residential population. The Project does not include residential components, and it is anticipated that future employees would reside within the City and immediately surrounding area. Accordingly, the proposed Project would not result in an increase in population. Therefore, implementation of the proposed Project would not result in the increased use or substantial physical deterioration of an existing neighborhood or regional park or other recreational facility, and any impact would be less than significant.

Mitigation Measures
None required.

Level of Significance After Mitigation
Less than significant with no mitigation required.

Threshold REC-2: Would the project include recreational facilities or require the construction or expansion of recreational facilities which might have an adverse physical effect on the environment?
Impact Analysis
The proposed Project would involve the development of a commercial marketplace that includes a detention basin on the northern portion of the Project Site that would be fenced and screened with landscaping. Near the detention basin would be a play area which would include landscaped mounds, benches, picnic tables, bike racks and a lawn area. As discussed under Threshold REC-1, the Project would not increase demand on existing recreational facilities to a degree that new or expanded recreational facilities would be required. Therefore, the Project would not require the construction of new or expansion of existing recreational facilities beyond what is proposed on-site that could result in an adverse physical effect on the environment. Any impact would be less than significant.

Mitigation Measures
None required.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.15 Public Services and Recreation City of Bakersfield – SCH No. 2025101507 4.15-13
Level of Significance After Mitigation
Less than significant with no mitigation required.

Cumulative Impacts
Potential cumulative impacts would occur if the proposed Project in combination with the identified cumulative projects would result in significant effects to Public Services and Recreation. It is anticipated that all cumulative projects would be served by BFD and KCFD as well as BPD in coordination with CHP and KCSO. Operation of the identified cumulative projects is anticipated to increase the overall demand for fire protection and police services; however, the Project and related projects would have less than significant impacts to fire and police services, as additional demands for fire and police protection services are unlikely to have a substantial effect on the existing firefighters and police officers to residents ratio and would result in a nominal increase in the demand for fire and police protections services. Moreover, all new development would be required to pay applicable impact fees to support fire and police protection services. Accordingly, the Project when combined with the cumulative projects, would not have any cumulatively considerable impacts on fire and police protection services.

The Project would develop a new commercial marketplace and would not require development of new housing or would generate any new students or increase demand for school services. As discussed, it is anticipated that future employees of the proposed Project would reside within the City and in the immediately surrounding area. Therefore, the Project is not anticipated to result in substantial, unplanned population growth or demand for new schools. The Project as well as all the cumulative projects identified would be subject to impact fees in compliance with State law.

Accordingly, the Project when combined with the cumulative projects, would not have any cumulatively considerable impacts on schools.

It is anticipated that future employees would continue to use park facilities near their homes and use of parks or other recreational facilities close to the Project site would be nominal. Accordingly, the Project is not anticipated to affect service ratios or other performance objectives for parks and would not require the construction of any new or altered park facility. Cumulative non-residential projects near the Project would not affect service ratios for parks and would not require the construction of any new or altered parks for the same reason. For cumulative projects that include housing, those individual projects would be required to analyze their impact to parks and recreation services and mitigate their impact if necessary. Therefore, the less than significant impacts associated with the Project are not anticipated to combine with any impacts associated with the cumulative projects to substantially affect parks near the Project Site. Cumulative impacts associated with parks and recreation would be less than significant.

The Project would not result in substantial unplanned population growth, affecting service ratios or other performance objectives for other services such as libraries. As with recreation and parks, non-residential projects would likely have a nominal impact to recreation services. Cumulative housing projects would be required to assess whether the project would increase the use of libraries and mitigate its impact if necessary. As such, the less than significant impacts associated with the Project are not anticipated to combine with any impacts associated with the cumulative projects to substantially affect libraries near the Project Site. Cumulative impacts associated with libraries would be less than significant.

Mitigation Measures
No mitigation measures are required as impacts would be less than significant.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.15 Public Services and Recreation City of Bakersfield – SCH No. 2025101507 4.15-14
Level of Significance After Mitigation
Project-specific and cumulative impacts related to public services would be less than significant with no mitigation required.

City of Bakersfield – SCH No. 2025101507 4.16-1

4.16 Transportation
This section discusses the impacts associated with the potential for the proposed Riverview Marketplace Commercial Project (Project) on transportation and traffic. Potential effects are evaluated relative to conflicts with a program plan, ordinance or policy addressing the circulation system, including transit, roadway, bicycle and pedestrian facilities; conflicts or inconsistencies with CEQA Guidelines Section 15064.3, subdivision (b); substantially increasing hazards due to a geometric design feature or incompatible uses; or resulting in inadequate emergency access.

This section includes a description of existing transportation and circulation conditions in the Project vicinity, a summary of applicable regulations related to transportation, and an evaluation of the potential transportation and traffic impacts that would be generated during construction and operation of the Project. Information in this section is based, in part, on the Riverview Market Transportation Analysis (TIA) prepared for the Project by Integrated Engineering Group (IEG) (Appendix H-1) and a Vehicle Miles Traveled (VMT) Analysis prepared for the Project by General Technologies and Solutions (GTS) (Appendix H-2), included in Appendix H Transportation Analysis, of this Draft Environmental Impact Report (Draft EIR), as well as the Metropolitan Bakersfield General Plan (General Plan), the City of Bakersfield Municipal Code (Municipal Code) and the City of Bakersfield (City) Title 17 - Zoning Ordinance (Zoning Ordinance).

During the scoping period for the Project’s EIR, no comments were received in response to the Notice of Preparation (NOP) related to transportation.

4.16.1 Regulatory Setting
State
Senate Bill No. 743
California Senate Bill (SB) 743, which was signed into law in 2013, initiated an update to the CEQA Guidelines to change how lead agencies evaluate transportation impacts under CEQA, with the goal of better measuring the actual transportation-related environmental impacts of any given project. Traditionally, transportation impacts have been evaluated by examining whether the project is likely to cause automobile delay at intersections and congestion on nearby individual highway segments, and whether this delay will exceed a certain amount (this is known as Level of Service or LOS analysis). As of July 1, 2020, agencies analyzing the transportation impacts of new projects must use the VMT metric instead of LOS in evaluating traffic impacts in CEQA documents. VMT measures how much actual auto travel (additional miles driven) a project would add to California roads.

Regional
Kern County Council of Governments Regional Transportation Plan/Sustainable Communities Strategy
The Project site is located within the jurisdiction of the Kern County Council of Governments (Kern COG). Pursuant to federal and state law, Kern COG serves as the Regional Transportation Planning Agency (TPA), and the Metropolitan Planning Organization (MPO) for Kern County (County). As the County’s regional planning agency for transportation, Kern COG is responsible for coordinating transportation planning and programming among its member jurisdictions and partner agencies. Kern COG prepares regional transportation planning documents (including the Regional Transportation Plan/Sustainable Communities Strategy [RTP/SCS]), supports regional Riverview Marketplace Commercial Project
Environmental Impact Report 4.16 Transportation
City of Bakersfield – SCH No. 2025101507 4.16-2
transit and mobility planning efforts, and programs certain state and federal transportation funds for projects and services in the Kern region, while also coordinating with other agencies on related planning considerations such as air quality and growth forecasts as applicable.

Local
Metropolitan Bakersfield General Plan
The General Plan, dated December 2002, was updated in January 2016 per Resolution No. 018- 16, 019-16. At the time this EIR was published for public review, the City was in the process of updating its Bakersfield 2045 General Plan, but it has not yet been adopted. The General Plan includes goals, policies, and directions to achieve the City’s vision of the community and future development. The General Plan includes 12 elements that focus on: Land Use; Circulation; Housing; Conservation; Noise; Safety; Downtown Redevelopment; Open Space; Public Services Facilities; Parks; Kern River Plan; and Historical Resources.

The General Plan established the following goals and policies, in order to protect the City’s transportation capabilities.

Land Use Element
LAND/COM-P-29 Require that automobile and truck access to commercial properties sited adjacent to designated residential parcels be located at the maximum practical distance from the residential parcel.

LAND/COM-P-30.B Require perimeter street(s) around new commercial office, retail, mixed-use, and industrial business park land uses where they will enhance pedestrian and vehicular access from adjacent residential neighborhoods or promote convenient access to public transit services, and where anticipated traffic will not detrimentally impact local streets. Exceptions may be allowed if natural or artificial barriers such as, but not limited to, railroads, utility corridors, canals or other watercourses, or topographic features exist that create a logical separation between the uses, or to encourage infill development.

LAND/PF-P-54 The developer shall be responsible for all on-site costs incurred as a result of the proposed project, in addition to a proportional share of off-site costs incurred in service extension or improvements. The availability of public or private services or resources shall be evaluated during discretionary project consideration. Availability may affect project approval or result in a reduction in size, density, or intensity otherwise indicated in the general plan's map provisions.

LAND/COM-G-30.B Require perimeter street(s) around new commercial office, retail, mixed-use, and industrial business park land uses where they will enhance pedestrian and vehicular access from adjacent residential neighborhoods or promote convenient access to public transit services, and where anticipated traffic will not detrimentally impact local streets. Exceptions may be allowed if natural or artificial barriers such as, but not limited to, railroads, utility corridors, canals or other watercourses, or topographic features exist that create a logical separation between the uses, or to encourage infill development.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.16 Transportation
City of Bakersfield – SCH No. 2025101507 4.16-3
Circulation Element
CIRC/G-1 Provide a safe and efficient street system that links all parts of the area for movement of people and goods.

CIRC/G-2 Provide for safe and efficient motorized, non-motorized, and pedestrian traffic movement.

CIRC/G-3 Minimize the impact of truck traffic on circulation, and on noise sensitive land uses.

CIRC/STR-P-6 Design and locate site access driveways to minimize traffic disruption where possible considering items such as topography, past parcelization and other factors.

CIRC/STR-P-7 Minimize direct and uncontrolled property access from arterials.

CIRC/STR-P-16 Require that truck access to commercial and industrial properties be designed to minimize impacts on adjacent residential parcels.

CIRC/STR-P-17 Require buildings expected to be serviced by delivery trucks to provide off-street facilities for access and parking.

CIRC/STR-P-33 Provide new transportation facilities as needed based on existing usage and future demand.

CIRC/STR-P-34 Minimize the impacts of land use development on the circulation system.

Review all development plans, rezoning applications, and proposed general plan amendments with respect to their impact on the transportation system, and require revisions as necessary.

CIRC/STR-P-35 Require new development and expansion of existing development in incorporated areas to fully provide for on-site transportation facilities including streets, curbs, traffic control devices, etc. Within unincorporated areas street improvements will be determined by County Ordinance.

CIRC/STR-P-36 Prevent streets and intersections from degrading below Level of Service "C" where possible due to physical constraints (as defined in a Level of Service Standard) or when the existing Level of Service is below "C" prevent where possible further degradation due to new development or expansion of existing development with a three part mitigation program:
adjacent right-of-way dedication, access improvements and/or an area-wide impact fee. The area-wide impact fee would be used where the physical changes for mitigation are not possible due to existing development and/or the mitigation measure is part of a larger project, such as freeways, which will be built at a later date.

CIRC/STR-P-37 Require new development and expansion of existing development to pay for necessary access improvements, such as street extensions, widenings, turn lanes, signals, etc., as identified in the transportation impact report as may be required for a project.

CIRC/STR-P-39 Require new development and expansion of existing development to pay or participate in its pro rata share of the costs of expansions in area-wide transportation facilities and services which it necessitates.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.16 Transportation
City of Bakersfield – SCH No. 2025101507 4.16-4
CIRC/BIKE-P-1 Require bicycle facilities to be designed in accordance with the State Bikeway Design Criteria,
CIRC/BIKE-P-5 Consider bicycle safety when implementing improvements for automobile traffic operations.

CIRC/BIKE-P-7 Provide bicycle parking facilities at activity centers such as shopping centers, employment sites, and public buildings.

CIRC/PARK-G-2 Satisfy parking requirements in all new developments (residential, commercial, industrial, etc.) through off-street facilities.

CIRC/PARK-P-3 Ensure that adequate on-site parking supply and parking lot circulation is provided on all site plans in accordance with the adopted parking standards.

4.16.2 Environmental Setting
The Project is proposed to be developed in two phases on an approximately 46-acre site. The Project Site consists of a single legal parcel (APN 368-010-05) and is currently undeveloped. The L-shaped property is generally located along the south side of Rosedale Highway, north of the railroad tracks, west of Coffee Road, and east of El Toro Viejo Road.

Roadway Network
Locally significant roadways located near the Project are discussed below. Their buildout classifications are identified per the General Plan.
• Brimhall Road functions as a four (4)-lane collector from Jewetta Avenue to Coffee Road.

The buildout classification for Brimhall Road is an arterial from Jewetta Avenue to Calloway Drive and a collector between Calloway Drive and Coffee Road. • Calloway Drive functions as a six (6)-lane arterial from Meacham Road to CA-58 and Brimhall Road to Westside Parkway eastbound (EB) ramps, and a four (4)-lane arterial from CA-58 to Brimhall Road. The buildout classification for these segments of Calloway Drive is an arterial.
• Coffee Road functions as a six (6)-lane arterial from Olive Drive to Stockdale Highway.

The buildout classification for this segment of Coffee Road is an arterial. • Rosedale Highway functions as a four (4)-lane arterial from Old Farm Road to Verdugo Lane and a six (6)-lane arterial from Verdugo Lane to Fruitvale Road. The buildout classification for these segments of Rosedale Highway is an arterial.

Transit Service
The Golden Empire Transit (GET) District is the main transit agency servicing the City. Currently, GET operates buses on the following three (3) routes within the vicinity of the Project:
• Route 61 operates seven days a week and connects the Project Site to Bakersfield College to the east and California State University at Bakersfield to the south. Bus stops for Route 61 are currently located across the Project Site, east of the intersection of Northwest Promenade and CA-58 for eastbound travel and along the west side of Coffee Road, south of Granite Falls Drive for southbound travel. Pedestrian accessibility and Riverview Marketplace Commercial Project
Environmental Impact Report 4.16 Transportation
City of Bakersfield – SCH No. 2025101507 4.16-5
connectivity from the Project Site to these bus stops within a half mile walking distance is provided along both sides of CA-58 and the west side of Coffee Road. • Route 82 operates seven days a week and connects the Project Site to Liberty High School, Bakersfield Christian High School and California State University at Bakersfield to the west and south, and to the Downtown Transit Center to the east. Bus stops for Route 82 are currently located along CA-58 at Northwest Promenade II for both eastbound and westbound travel. Pedestrian accessibility and connectivity from the Project Site to these bus stops within a half-mile walking distance is provided along both sides of CA-58. • Route 84 operates seven days a week and connects the Project Site to Frontier High School to the west and the Downtown Transit Center to the east. Bus stops for Route 84 are currently located along CA-58 at Northwest Promenade II for both eastbound and westbound travel. Pedestrian accessibility and connectivity from the Project Site to these bus stops within a half-mile walking distance is provided along both sides of CA-58.

Pedestrian and Bicycle Facilities
Pedestrian facilities near the Project Site include sidewalks along both sides of Rosedale Highway, both sides of Coffee Road north of Jet Way and the west side of Coffee Road south of Jet Way. Pedestrian crosswalks are provided at signalized intersections along Rosedale Highway and Coffee Road. Existing Class II Bike Lanes are provided in both directions along Rosedale Highway and Coffee Road.

Existing Vehicle Trips
As no active uses are currently present on the Project Site, there are no existing vehicle trips generated by the Project.

4.16.3 Impact Analysis
Methodology
To analyze the transportation impacts of the Project, IEG prepared the TIA and GTS prepared a VMT Analysis for the Project, which are included in Appendix H, Transportation, of this Draft EIR.

VMT Analysis
As discussed above, SB 743 initiated the removal of vehicle delay and LOS from consideration under CEQA. Instead, transportation impacts are to be evaluated based on a project’s VMT. The City has yet to adopt its own SB 743 guidelines; therefore, the VMT analysis was conducted using the methodology and significant threshold criteria identified in the California Governor’s Office of Planning and Research (OPR) Technical Advisory (TA). Prior to preparing the VMT Analysis for the Project, IEG considered screening criteria that would exempt the Project from having to complete a VMT analysis based on OPR (currently Governor’s Office of Land Use and Climate Innovation [LCI]) TA, dated December 2018. Given the size of the Project (retail uses greater than 50,000 square feet) and the estimated number of trips generated by the Project (approximately 13,185 daily trips), the Project does not qualify for VMT screening criteria for small projects, map-based screen for residential and office projects, local-serving retail, and other screening criteria for institutional uses and affordable housing. Therefore, the VMT Analysis includes a full VMT evaluation using the most recent Kern COG San Joaquin Valley Model Improvement Program Phase 3 (VMIP III) model.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.16 Transportation
City of Bakersfield – SCH No. 2025101507 4.16-6
Kern COG VMIP III Model
The VMT analysis evaluated the Project using the 2020 and 2046 model years of the Kern COG VMIP III model, which is the most recent version of the travel model. Kern COG VMIP III is a socioeconomic data-based model and so the Project land uses must be converted into model socioeconomic data categories for modeling purposes. The Institute of Transportation Engineers (ITE), Trip Generation manual was used to convert the Project land uses’ square footage into number of employees. The ITE Trip Generation manual includes trips for land uses by different/multiple units (e.g., square feet, employees, rooms). Trip rates for both square footage and number of employees from the manual were used to estimate number of employees for land uses which in turn was used to estimate total project employees. All Project land uses were converted into employment based on ITE conversion process except the automated carwash.

Project-specific employment data for the proposed carwash was unavailable, and standard sources such as the ITE Trip Generation Manual do not provide employment estimates for this land use. Accordingly, a planning level assumption was applied, consisting of two employees per shift, two shifts per day, and one manager, for a total of five employees used for VMT modeling purposes. Therefore, an estimated total of 5 employees was used for the automated carwash.

More detailed discussion of the methodology used is provided in the VMT Analysis prepared by GTS in (Appendix H-2). Table 4.16-1: Project Employment Estimation, shows the employment conversion factors and total employment for the project land uses.

Table 4.16-1: Project Employment Estimation
Land Use Category Quantity Employees per
Land Use Unit Total Employees Model Employment Category Shopping Center 244.417 TSF 2.12 519 Retail
Medical Office 9.129 TSF 4.13 38 Medical
Drive-thru Restaurants 16.884 TSF 10.50 177 Food Industry Automated Carwash 4.1 TSF n/a 5 Retail
Public Storage 40 TSF 0.34 14 Industrial
Gas Filing Station 40 VFP 0.62 25 Retail
Shopping Center (Phase II)1

89.818 TSF 2.12 191 Retail
Total 969
Source: GTS, 2026.

Notes:

TSF = thousand square feet; VFP = vehicle fueling positions

1. The Shopping Center is proposed to be constructed in Phase II of the Project and all other land uses are proposed to be constructed in Phase I.

However, both phases were combined for the purposes of the VMT analysis.

VMT Evaluation
While the Project consists of multiple non-residential land uses, all the Project land uses can be considered retail land uses, except for the proposed medical office which was evaluated using a VMT per employee metric. Therefore, two separate methodologies are used to analyze all of the Project’s the retail uses and the medical office use.

Retail Land Use
According to OPR TA guidance for evaluating retail projects, the appropriate VMT metric to analyze retail uses is the change in total roadway VMT within a defined geographic area (the “region”). A retail project is considered to generate a significant transportation impact if the total regional VMT under the “With Project” scenario is higher than the VMT estimated for the “Without Project” scenario. Given the Project’s location and size, it was determined that Kern County Riverview Marketplace Commercial Project
Environmental Impact Report 4.16 Transportation
City of Bakersfield – SCH No. 2025101507 4.16-7
(County) can be used as the region for the purposes of project VMT evaluation. Therefore, the Project retail uses would have a significant impact if there were a net increase in roadway VMT within the County between the “With Project” and “Without Project” scenarios.

Medical Office Land Use
The OPR TA recommends using VMT per employee as the appropriate metric for evaluating office land uses. For the medical office uses, the Project’s medical office would have a significant impact if the project VMT per employee is greater than 85 percent of the County’s baseline average VMT per employee. Consistent with the retail analysis, Kern County was defined as the region for this evaluation.

Pedestrian and Bicycle Facilities VMT Reductions
As the Project incorporates and expands active transportation facilities for pedestrians and bicyclists, the VMT analysis accounts for potential VMT reductions associated with these improvements. However, conventional travel demand models are not well suited to quantify VMT reductions resulting from localized mode shift attributable to enhanced active transportation infrastructure. Accordingly, supplemental off-model calculations were conducted to estimate VMT reductions associated with the proposed Project improvements. These off-model calculations follow the methodologies and default assumptions outlined in the California Air Pollution Control Officers Association (CAPCOA) Handbook for Analyzing Greenhouse Gas Emission Reductions, Assessing Climate Vulnerabilities, and Advancing Health and Equity (October 2024). Specifically, the impact analysis below considers VMT reductions for providing the proposed end-of-trip bicycle facilities, pedestrian network improvements, and bicycle facility improvements included in the Project.

Level of Service Analysis
As identified in the General Plan Circulation Element policies in Section 4.16.1 above, new development projects within the City are required to provide needed infrastructure improvements to meet the demand created by the development and provide off-site improvements designed to ensure construction of the local and regional transportation networks to their ultimate classifications. These improvements could be funded through development fee payment towards adopted funding mechanisms such as Metropolitan Bakersfield Regional Transportation Impact Fee (RTIF) program. If the improvements are not identified in the RTIF, they are considered local improvements, and the project will pay its fair share contribution towards the cost of these improvements.

Although LOS is no longer used as a CEQA impact metric, intersection LOS analysis was performed for General Plan consistency and to inform local circulation planning. The City has required the preparation of the TIA to identify and document potential traffic deficiencies associated with implementation of the Project (Appendix H-1).

In coordination with City staff, the TIA identifies LOS deficiencies for compliance with the General Plan goals, which has established LOS “C” as the minimum allowable level of service at intersections and roadway segments. Therefore, if the addition of project traffic causes the following at any intersection or roadway segment within the Study Area established by the TIA, it will be considered deficient for the purposes of this analysis:
• Drops to LOS D or worse
Riverview Marketplace Commercial Project
Environmental Impact Report 4.16 Transportation
City of Bakersfield – SCH No. 2025101507 4.16-8
• Operates at LOS D or worse under pre-project conditions and project traffic lowers the LOS below pre-project conditions
• For intersections only, an increase in delay per vehicle greater than 5 seconds when operating at LOS D or worse in pre-project conditions
Study Area
The Study Area includes the following key intersections and roadway segments.

Intersections

1. Patton Way and Rosedale Highway

2. Coffee Road and Rosedale Highway

3. Northwest Promenade/Project Driveway and Rosedale Highway

4. El Toro Viejo Road/Clay Patrick Farr Way and Rosedale Highway

5. Calloway Drive and Rosedale Highway

6. Verdugo Lane and Rosedale Highway

7. Old Farm Road and Rosedale Highway

8. Coffee Road and Brimhall Road

9. Harvest Creek Road and Brimhall Road – not collector

10. Calloway Drive and Brimhall Road

11. Verdugo Lane and Brimhall Road

12. Jewetta Avenue and Brimhall Road

13. Old Farm Road and Brimhall Road

14. Allen Road and Brimhall Road

15. Coffee Road and Olive Drive

16. Coffee Road and Hageman Road

17. Coffee Road and Riverlakes Drive/Meany Avenue

18. Coffee Road and Downing Avenue

19. Coffee Road and Granite Falls Drive

20. Coffee Road and Jet Way/Project Driveway

21. Coffee Road and Westside Parkway (CA-58) EB Ramps

22. Coffee Road and Truxtun Avenue

23. Coffee Road/Gosford Road and Stockdale Highway

24. Calloway Drive and Noriega Road

25. Calloway Drive and Hageman Road

26. Callaway Drive and Meacham Road
Roadway Segments

1. Rosedale Highway between Old Farm Road and Verdugo Lane

2. Rosedale Highway between Verdugo Lane and Calloway Drive

3. Rosedale Highway between Calloway Drive and El Toro Viejo Road/Clay Patrick Farr Way

4. Rosedale Highway between El Toro Viejo Road/Clay Patrick Farr Way and Project Driveway/Northwest Promenade

5. Rosedale Highway between Project Driveway/Northwest Promenade and Coffee Road

6. Rosedale Highway between Coffee Road and Patton Way

7. Coffee Road between Olive Drive and Hageman Road

8. Coffee Road between Hageman Road and Meany Avenue/Riverlakes Drive

9. Coffee Road between Meany Avenue/Riverlakes Drive and Downing Avenue

10. Coffee Road between Downing Avenue and Granite Falls Drive Riverview Marketplace Commercial Project
Environmental Impact Report 4.16 Transportation
City of Bakersfield – SCH No. 2025101507 4.16-9

11. Coffee Road between Granite Falls Drive and Rosedale Highway

12. Coffee Road between Rosedale Highway and Project Driveway/Jet Way

13. Coffee Road between Project Driveway/Jet Way and Brimhall Road

14. Coffee Road between Brimhall Road and Westside Parkway (CA-58) EB Ramps

15. Coffee Road between Westside Parkway EB Ramps and Truxtun Road

16. Coffee Road between Truxtun Road and Stockdale Highway

17. Calloway Drive between Noriega Road and Hageman Road

18. Calloway Drive between Hageman Road and Meacham Road

19. Calloway Drive between Meacham Road and Rosedale Highway

20. Calloway Drive between Rosedale Highway and Brimhall Road

21. Brimhall Road between Allen Road and Old Farm Road

22. Brimhall Road between Old Farm Road and Jewetta Avenue

23. Brimhall Road between Jewetta Avenue and Verdugo Lane

24. Brimhall Road between Verdugo Lane and Calloway Drive

25. Brimhall Road between Calloway Drive and Harvest Creek Road

26. Brimhall Road between Harvest Creek Road and Coffee Road

27. Hageman Road between Calloway Drive and Coffee Road Traffic Data Collection and Volume Development
Existing traffic conditions were established using weekday daily segment counts and intersection turning movement counts collected on February 20, 2025. This data provided the baseline for all future traffic volume projections.

Future roadway segment volumes were developed by applying compounded annual growth rates derived from comparisons between the Kern COG regional travel demand model Base Year 2020 and Future Year 2046 Model Improvement Program outputs. Intersection peak-hour forecasts were prepared using the Directional Volume Method described in the National Cooperative Highway Research Program (NCHRP) Report 255, which balances approach volumes at each intersection based on existing counts, forecasted segment volumes, and assumed travel patterns.

These procedures account for ambient growth, cumulative development, and planned regional transportation improvements.

Project Trip Generation and Distribution
Project trip generation was estimated using rates and methodologies from the Institute of Transportation Engineers (ITE) Trip Generation Manual, 12th Edition. Trip-generating land uses were quantified based on proposed development characteristics. Project trip distribution was developed based on surrounding land uses, regional access patterns, planned roadway connections, and existing traffic flow characteristics within the study area.

Project trip distribution and assignment were developed, in coordination with City staff, based on the land use characteristics of the proposed Project and surrounding area, existing travel patterns within the study area, anticipated travel patterns to and from the Project Site, and approved projects located in the vicinity of the Project Site. Project scenarios and study area were then established in coordination with City staff to determine the potential project deficiencies on the transportation network.

Where appropriate, fitted curve equations were used for specific uses such as the medical office land use, and locally supported survey data was applied for land uses including gasoline fueling stations and automated carwash facilities. Internal capture reductions among compatible land uses were calculated following procedures outlined in NCHRP Report 684 and the ITE Trip Riverview Marketplace Commercial Project
Environmental Impact Report 4.16 Transportation
City of Bakersfield – SCH No. 2025101507 4.16-10
Generation Handbook. Pass-by reductions were applied using ITE guidance to reflect trips already on the surrounding roadway network. Resulting daily and peak hour trips reflect conservative assumptions consistent with professional practice and City standards Table 4.16-2: Project Trip Generation summarizes the calculated trip generation based on the land use units associated with the Project phases. As shown on Table 4.16-2, the Project is anticipated to generate approximately 13,185 total daily trips, 676 AM peak hour trips and 1,183 PM peak hour trips.

Table 4.16-2: Project Trip Generation
Land Use1
AM Peak Hour PM Peak Hour
Intensity 2In Out Total In Out Total Daily

PHASE I PROJECT COMPONENTS
Shopping Center 244.417 TSF 152 95 247 420 436 856 8,894 Pass-by Reduction (29% - PM Peak Hour & Daily) 5 0 0 0 122 126 248 2,579 Subtotal 152 95 247 298 310 608 6,315
Medical Office 9.129 TSF 22 6 28 8 20 28 295
Internal Capture (18% - AM In, 83% - AM Out, 50% - PM In, 25% - PM Out, 32% - Daily)4 4 5 9 4 5 9 94
Subtotal 18 1 19 4 15 19 201
Fast Food Restaurant w/ Drive-Thru Window 16.884 TSF 286 275 561 277 256 533 7,566 Internal Capture (22% - AM In, 15% - AM Out, 29% - PM In, 42% - PM Out, 35% - Daily) 63 41 104 80 108 188 2,648
Pass-by Reduction (50% - AM Peak Hour, 55% - PM Peak Hour & Daily 112 117 229 108 81 189 2,705
Subtotal 111 117 228 89 67 156 2,213
Automated Carwash 1 Tunnel 34 34 68 57 57 114 1,447
Internal Trip Capture Shared with Costco Fuel (Per Costco Data)6 22 22 44 40 40 80 1,025
Pass-by Reduction (Per Costco Data) 8 8 16 12 12 24 295 Subtotal 4 4 8 5 5 10 127
Self-Storage 40 TSF 2 1 3 3 3 6 52
Internal Capture (8% - AM In, 13% - AM Out, 10% - PM In, 8% - PM Out, 9% - Daily) 0 0 0 0 0 0 5
Subtotal 2 1 3 3 3 6 47
Gasoline Service Station 40 VFP 285 285 570 410 410 820 10,196 Internal Capture (8% - AM In, 13% - AM Out, 10% - PM In, 8% - PM Out, 9% - Daily) 23 37 60 41 29 70 816
Pass-by Reduction (Per Costco Data) 216 214 430 293 292 585 7,316 Subtotal 46 34 80 76 89 165 2,064
PHASE I TOTAL 333 252 585 475 485 960 10,865

PHASE II PROJECT COMPONENTS
Shopping Center 89.818 TSF 56 35 91 154 160 314 3,268
Pass-by Reduction (29% - PM Peak Hour & Daily)
5 0 0 0 45 46 91 948
PHASE II TOTAL 56 35 91 109 114 223 2,320
PHASE I & PHASE II (PROJECT) TOTAL 389 287 676 584 599 1,183 13,185 Source: IEG, 2026.

Notes:
1 Trip Generation Source: Institute of Transportation Engineers (ITE), Trip Generation Manual, 12th Edition (2025). 2 TSF = Thousand Square Feet; VFP = Vehicle Fueling Positions Riverview Marketplace Commercial Project
Environmental Impact Report 4.16 Transportation
City of Bakersfield – SCH No. 2025101507 4.16-11
Land Use1
AM Peak Hour PM Peak Hour
Intensity 2In Out Total In Out Total Daily
3 Peak hour and daily trip rates for Medical Office use are based on fitted curve equations for total 9,129 sf of medical office proposed for entire project.
4 Internal capture calculations are included in Appendix H 5 Pass-by reduction percentage is based on the ITE methodology per 2025 Pass-By Tables for ITE Trip Generation Appendices. Refer to Appendix A 6 ADT and Peak Hour rates are based on Costco survey data Included in Attachment H Study Scenarios
The TIA analyses the intersections and roadway segments operating conditions which were selected for the following anticipated timeframe scenarios:
• Existing Conditions (Year 2025)
• Year 2027 Cumulative Conditions
• Year 2027 Cumulative + Project Phase I Conditions
• Year 2028 Cumulative Conditions
• Year 2028 Cumulative + Project Phases I & II Conditions • Buildout Year (based on current Kern COG model) Conditions (Year 2046) • Buildout Year (based on currently Kern COG model) + Project Phases I & II Conditions Intersection Operations Analysis
Intersection operations were evaluated using Synchro Version 12 software based on methodologies in the Highway Capacity Manual, 7th Edition. Signalized intersection performance was measured using average control delay per vehicle.

Under the Existing Conditions (Year 2025) Scenario, all analyzed intersections are operating at an acceptable LOS except for the following intersections:
• Coffee Road and Rosedale Highway
• Calloway Drive and Rosedale Highway
• Coffee Road and Brimhall Road
• Coffee Road/Gosford Road and Stockdale Highway
• Coffee Road/Gosford Road and Stockdale Highway
Roadway Segment Capacity Analysis
Roadway segment operations were evaluated by comparing existing and projected average daily traffic (ADT) volumes to capacity thresholds identified in the General Plan Circulation Element.

Roadway capacities vary by functional classification (e.g., arterial or collector) and number of travel lanes. Volume-to-capacity ratios were used to identify segments operating below acceptable levels.

Under Existing Conditions (Year 2025) Scenario, all analyzed roadway segments are operating at an acceptable LOS except for the following roadway segments:
• Coffee Road between Truxtun Road and Stockdale Highway • Calloway Drive between Rosedale Highway to Brimhall Road Riverview Marketplace Commercial Project
Environmental Impact Report 4.16 Transportation
City of Bakersfield – SCH No. 2025101507 4.16-12
Queuing and Access Analysis
Site access intersections and key driveways were evaluated to ensure that projected vehicle queues would not exceed available storage lengths or adversely affect adjacent intersections.

Queuing analyses were conducted for each scenario, and recommended turn lane lengths or operational measures were identified where necessary.

Thresholds of Significance
The City utilizes the California Environmental Quality Act (CEQA) Guidelines, Appendix G, and thresholds of significance1to analyze the environmental impacts of the Project. Per CEQA Guidelines, an impact is considered significant if the Project would:
• Conflict with a program plan, ordinance or policy addressing the circulation system, including transit, roadway, bicycle and pedestrian facilities. • Conflict or be inconsistent with CEQA Guidelines §15064.3, subdivision (b). • Substantially increase hazards due to a geometric design feature (e.g., sharp curves or dangerous intersections) or incompatible uses (e.g., farm equipment). • Result in inadequate emergency access.

Project Impacts
Threshold TRA-1: Would the project conflict with a program, plan, ordinance or policy addressing the circulation system, including transit, roadway, bicycle and pedestrian facilities?
Impact Analysis
The Project’s proposed commercial center would be consistent with the surrounding commercial uses as well as the amended General Plan designation and zoning district, thus implementing the City’s vision for the area. As further discussed in Section 4.11, Land Use and Planning, Threshold LUP-2, of this Draft EIR, the Project would be consistent with the applicable land use planning goals and policies contained in the General Plan.

Transit, Bicycle, and Pedestrian Facilities
Implementation of the Project would not impact any of the existing transit stops or propose new transit stops. The Project would include several pedestrian and bicycle improvements. The Project provides end-of-trip bicycle amenities, including bicycle parking and lockers, new sidewalks along its frontages, and a new bicycle lane along Rosedale Highway which extends the existing facilities in the future. These would be designed in accordance with the State Bikeway Design Criteria consistent with General Plan policy CIRC/BIKE-P-1, and future implement General Plan policies CIRC/BIKE-P-5 and CIRC/BIKE-P-7 which promote bicycle safety and the implementation of bicycle parking facilities at shopping centers.

Roadway
As discussed in Methodology above, new development within the City is required to analyze LOS for nearby roadway segments and intersections that could be impacted by implementation of the 1 Association of Environmental Professionals (AEP). 2025. CEQA Guidelines Appendices, Appendix G: Environmental Checklist Form. Available at: https://www.califaep.org/docs/CEQA_Handbook_2025combined.pdf. Accessed January 2026.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.16 Transportation
City of Bakersfield – SCH No. 2025101507 4.16-13
Project as required by the General Plan. Therefore, in coordination with City staff, the TIA prepared for the Project (Appendix H-1) evaluated the Study Area intersections and roadway segments identified above. The TIA identifies LOS deficiencies for compliance with the General Plan goals, which has established LOS “C” as the minimum allowable level of service at intersections and roadway segments. Therefore, for this analysis, Project impacts would be considered potentially significant if the Study Area intersections or roadway segments:
• Drops to LOS D or worse
• Operates at LOS D or worse under pre-project conditions and project traffic lowers the LOS below pre-project conditions
• For intersections only, an increase in delay per vehicle greater than 5 seconds when operating at LOS D or worse in pre-project conditions
The analysis contained with the TIA found the following LOS findings for the study scenarios:

Year 2027 and Year 2028 Cumulative Scenario. Under these scenarios, four intersections would be operating at an unacceptable LOS; however, the deficient intersection locations with the addition of the Project will not add more than 5 seconds of delay. Therefore, no transportation improvements are required at these locations. Three roadway segments were identified to be deficient under this scenario, including:
• Coffee Road between Jet Way to Brimhall Road
• Coffee Road between Truxtun Road and Stockdale Highway • Calloway Drive between Rosedale Highway to Brimhall Road The identified deficient roadway segments along Coffee Road are operating at their ultimate buildout classification as designated in the General Plan, and no additional improvements are identified for these segments in the Bakersfield Regional RTIF Program. However, the Project will construct dedicated southbound right-turn lanes along the Coffee Road frontage, thereby preserving the intended capacity of the southbound through lanes. Therefore, no additional impact would occur and no mitigation is required.

The identified deficient roadway segment along Calloway Drive currently operates as a four-lane arterial. Under buildout conditions, this segment is designated as a six-lane arterial in the General Plan and is also identified in the Bakersfield RTIF Program as Project B62, which proposes widening the roadway from four to six lanes. Accordingly, no additional improvements would be required as part of the Project.

Buildout Year 2046 Scenario. Under this scenario, all analyzed intersections would operate at an acceptable LOS under the Buildout Year 2046 scenario except for the following:
• Coffee Road and Rosedale Highway
• Calloway Drive and Rosedale Highway
• Coffee Road and Brimhall Road
• Coffee Road/Gosford Road and Stockdale Highway
• Coffee Road & Project Dwy F
• Coffee Road & Project Dwy H
Riverview Marketplace Commercial Project
Environmental Impact Report 4.16 Transportation
City of Bakersfield – SCH No. 2025101507 4.16-14
Deficient roadway intersections Coffee Road and Rosedale Highway, Calloway Drive and Rosedale Highway, Coffee Road and Brimhall Road, Coffee Road/Gosford Road and Stockdale Highway with the addition of the Project will not add more than five seconds of delay. The Project driveways intersections would improve with installation of traffic signals; however, a traffic signal is not warranted at either location. As such, no significant impact would occur and no mitigation is required.

The roadway segment analysis under this scenario found five deficient roadway segments, including:
• Coffee Road between Jet Way to Brimhall Road
• Coffee Road between Brimhall Road to Westside Parkway (CA-58) EB Ramps • Coffee Road between Westside Parkway (CA-58) EB Ramps to Truxtun Road • Coffee Road between Truxtun Road and Stockdale Highway • Calloway Drive between Rosedale Highway to Brimhall Road As with the previous scenarios, the Project planned improvements with the Bakersfield RTIF Program, Project B62, would ensure that impacts are less than significant.

As discussed, the Project would be required to provide infrastructure improvements needed to meet the demand created by the development and provide off-site improvements designed to ensure the construction of the local and regional transportation networks to their ultimate classifications. These improvements could be funded through development fee payment towards adopted funding mechanisms such as the Bakersfield RTIF program. If the improvements are not identified in the RTIF, they are considered local improvements, and the project will pay its fair share contribution towards the cost of these improvements. All required improvements for the Project are already included as part of the design or would be funded by the Bakersfield RTIF program, which the Project applicant would be responsible for contributing to. Therefore, no additional improvements or mitigation would be required and the Project would be consistent with General Plan LOS requirements. As the Project would not conflict with a program, plan, ordinance, or policy addressing the circulation system, including transit, roadway, bicycle, and pedestrian facilities, impacts would be less than significant.

Mitigation Measures
None required.

Level of Significance After Mitigation
Less than significant impact with no mitigation required.

Threshold TRA-2: Would the project conflict or be inconsistent with CEQA Guidelines § 15064.3, subdivision (b)?
Impact Analysis
As discussed in Section 4.18.3, Methodology, OPR TA guidance recommends two different methodologies for evaluation of VMT for retail uses and for medical offices.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.16 Transportation
City of Bakersfield – SCH No. 2025101507 4.16-15
Retail Land Uses
According to OPR TA guidance for evaluating retail projects, the appropriate VMT metric to analyze retails uses is the change in total roadway VMT within a defined geographic area (the “region”). A retail project is considered to generate a significant transportation impact if the total regional VMT under the “With Project” scenario is higher than the VMT estimated for the “Without Project” scenario. Given the Project’s location and size, it was determined that the County can be used as the region for the purposes of project VMT evaluation. Therefore, the Project retail uses would have a significant impact if there were a net increase in roadway VMT within the County between the “With Project” and “Without Project” scenarios.

Table 4.16-3: Retail Land Uses Project VMT shows the total roadway VMT within the County for both scenarios under the base year (2020) and cumulative/horizon year (2046) conditions.

The total roadway VMT for Year 2028 values (With Project and Without Project VMT) were estimated using linear interpolation of 2020 and 2046 VMT numbers.

Table 4.16-3: Retail Land Uses Project VMT
Daily Countywide
Roadway VMT Year With Project Without Project Difference (VMT) Difference (Percentage) 2020 30,554,590 30,503,375 51,215 0.17 %
2028 32,624,519 32,582,785 41,733 0.13 %
2046 37,281,858 37,261,458 20,399 0.05 %
Source: GTS, 2026.

Medical Office Land Use
The OPR TA recommends using VMT per employee as the appropriate metric for evaluating office land uses. Under this guidance, an office project would have a significant impact if its VMT per employee exceeds 85 percent of the regional baseline average. Therefore, the Project’s medical office would have a significant impact if the project VMT per employee is greater than 85 percent of the County’s baseline average VMT per employee. Consistent with the retail analysis, the County was defined as the region for this evaluation.

Table 4.16-4: Medical Office Land Use Project VMT presents the VMT per employee estimates for the Project’s medical office use.

Table 4.16-4: Medical Office Land Use Project VMT
Base Year (2020)1 Project (Medical Office) Kern County
Kern County
Significance Threshold2
Total Employees (non-retail) 38 30,503,375 51,215
Homebased Work (HBW) VMT 571 32,582,785 41,733
HBW VMT per Employee3

15.13 16.52 14.04
Percentage above Significance
Threshold 7.76 % - -
Source: GTS, 2026.

Notes:

1. Estimated using “No Project” base year (2020) model run.

2. 85% of baseline regional average.

3. Calculated by dividing the HBW VMT by the total number of employees.

As demonstrated above in Table 4.16-3 and Table 4.16-4, the Project would result in a net increase in countywide roadway VMT under both existing and cumulative conditions, and that the Riverview Marketplace Commercial Project
Environmental Impact Report 4.16 Transportation
City of Bakersfield – SCH No. 2025101507 4.16-16
Project’s medical office component would exceed the applicable VMT per employee threshold.

Accordingly, the Project would result in a potentially significant VMT impact under CEQA.

VMT Percentage Reduction
The VMT Analysis prepared for the Project also considered potential VMT reductions from the Project’s proposed pedestrian and bicyclist facilities. As discussed above, default assumptions outlined in the CAPCOA Handbook for Analyzing Greenhouse Gas Emission Reductions, Assessing Climate Vulnerabilities, and Advancing Health and Equity were used to calculate potential VMT reductions.

The Project provides end-of-trip bicycle amenities, including bicycle parking and lockers.

Consistent with CAPCOA Measure T-10, Provide End-of-Trip Bicycle Facilities, the provision of these facilities can achieve a reduction in employee commute VMT corresponding to a 0.1 percent to 4.4 percent reduction in greenhouse gas emissions.

The Project also proposes new sidewalks along its frontages, improving pedestrian connectivity and walkability. Based on CAPCOA Measure T-18, Provide Pedestrian Network Improvements, the provision of sidewalks and an enhanced pedestrian network can result in up to a 6.4 percent reduction in greenhouse gas emissions associated with household vehicle travel at the plan or community level.

Additionally, the Project proposes a new bicycle lane along Rosedale Highway, extending an existing facility and improving overall bicycle network connectivity. Consistent with CAPCOA Measure T-19-A, Construct or Improve Bicycle Facility, this improvement can achieve up to a 0.8 percent reduction in greenhouse gas emissions from displaced vehicle travel on roadways parallel to the bicycle facility. In addition, CAPCOA Measure T-19-B, Construct or Improve Bike Boulevard, indicates that bicycle-oriented corridor enhancements can result in up to a 0.2 percent reduction in greenhouse gas emissions from displaced vehicle travel.

Conclusion
As discussed above, the Project would exceed VMT significance thresholds for both retail and non-retail uses. The Project has been designed to incorporate feasible VMT reducing strategies that are consistent with State guidance and best practices, including enhanced pedestrian connectivity, new and expanded bicycle facilities, and end-of-trip bicycle amenities. Consistent with CAPCOA methodologies, these measures are estimated to result in a cumulative VMT reduction of approximately 0.1 percent to 11.8 percent. These reductions would meaningfully reduce VMT associated with retail uses and employee commute trips and represent a good-faith effort to minimize vehicle travel to the extent feasible given the Project’s location and operational characteristics. However, the reduction in VMT from the design features would not reduce VMT impacts to a less than significant level. As such, the Project would result in a significant impact.

No other feasible mitigation is available.

Mitigation Measures
No feasible mitigation is available.

Level of Significance After Mitigation
Significant and unavoidable impact.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.16 Transportation
City of Bakersfield – SCH No. 2025101507 4.16-17
Threshold TRA-3: Would the project substantially increase hazards due to a geometric design feature (e.g., sharp curves or dangerous intersections) or incompatible uses (e.g., farm equipment)?
Impact Analysis
As further discussed in Chapter 2, Project Description, of this Draft EIR, vehicular access to the Project Site would be provided via a proposed driveway along El Toro Viejo Road; three right-in/right-out only driveways and a signalized driveway along Rosedale Highway; and two right-in/right-out only driveways and a signalized driveway along Coffee Road. The signalized driveways would function as the main entries into the Project Site with secondary access provided via the non-signalized driveways. Combined, the proposed driveways would provide a direct connection to the comprehensive drive aisle system proposed within the parking areas of the Project Site.

Proposed off-site improvements include modification to the existing signalized intersection of Coffee Road and Jet Way. Specifically, the improvements would include the installation of a new traffic light pole/structure at the southeast corner of the Coffee Road and Jet Way intersection and any necessary roadway improvements (i.e., modification to the existing raised median to provide a dedicated left-turn lane, roadway striping). For the existing signalized intersection of Rosedale Highway and Northwest Promenade, which is the street that provides vehicular access to the commercial retail center north of the Project Site, no improvements or modifications to the traffic signal poles/structures would occur. However, a portion of the raised median on Rosedale Highway (the portion between Northwest Promenade and Coffee Road) would be modified to provide a dedicated left-turn lane for west-bound traffic entering the Project Site at the signalized intersection. Other roadway improvements at this intersection would include striping.

Loading and unloading of delivery trucks for the major retail buildings would occur in the designated loading dock of that building, which is toward the rear of the buildings. For the tenants of the outlying building pads, loading and unloading of delivery trucks would occur in designated areas (within proximity of the tenants) that would not impede the internal vehicular circulation system. No loading or unloading activities would occur in the parking areas or non-designated loading/unloading areas. The proposed Project driveways and internal drive aisles would be constructed pursuant to the City’s design standards and subject to review by the Bakersfield Fire Department (BFD) and the Kern County Fire Department (KCFD), which have an existing Joint Powers Agreement (JPA) to provide emergency services to the Project Site.

As discussed in Methodology, above, a project access vehicular queuing analysis was included in the TIA. This analysis was prepared to determine whether implementation of the Project would result in vehicle queuing that would cause hazardous conditions on surrounding roadways. This analysis found that the Project access points will not experience vehicular excess demand except at Coffee Road & Project Driveway G/Jet Way intersection, which is a main access point being constructed to the development. However, the Project would implement a dual left turn lane with 250 foot lanes at this location and as such, no queuing hazard would occur.

Sight distance at each project access point should be reviewed with respect to standard California Department of Transportation (Caltrans) sight distance standards at the time of preparation of final grading, landscape, and street improvement plans. In consideration of regulatory requirements and the improvements the Project would not substantially increase hazards due to a geometric design feature or incompatible land use. Therefore, impacts would be less than significant.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.16 Transportation
City of Bakersfield – SCH No. 2025101507 4.16-18
Mitigation Measures
None required.

Level of Significance After Mitigation
Less than significant impact with no mitigation required.

Threshold TRA-4: Would the project result in inadequate emergency access? Impact Analysis
As discussed above, vehicular access to the Project Site would be provided via a proposed driveway along El Toro Viejo Road; three right-in/right-out only driveways and a signalized driveway along Rosedale Highway; and two right-in/right-out only driveways and a signalized driveway along Coffee Road. The signalized driveways would function as the main entries into the Project Site with secondary access provided via the non-signalized driveways. The Project would also include off-site improvements to the existing signalized intersections of Coffee Road and Jet Way as well as modifications to a portion of the raised median on Rosedale Highway (the portion between Northwest Promenade and Coffee Road) to provide a dedicated left-turn lane for west-bound traffic entering the Project Site at the signalized intersection.

Construction
Construction of the proposed Project would be generally confined to the Project Site and would not physically impair access to the Project Site or the surrounding area. During both construction and long-term operation, the Project would be required to maintain adequate emergency access for emergency vehicles as required by the City, BFD, and KCFD. Additionally, the Project would include the preparation and implementation of a Construction Traffic Management Plan as a PDF.

The Construction Traffic Management Plan would be submitted to the City for review and approval prior to construction and would identify construction haul routes; construction worker parking and staging areas; construction phasing and scheduling; procedures for on-site loading, unloading, and material storage; temporary traffic control measures; provisions for maintaining pedestrian, bicycle, transit, and vehicular access to adjacent properties to the maximum extent feasible; methods to avoid or minimize lane closures and sidewalk closures; advance notification procedures for nearby property owners and affected agencies; dust, debris, and mud track-out control measures affecting adjacent roadways; and procedures to maintain emergency vehicle access at all times during construction. Implementation of the Construction Traffic Management Plan would reduce the potential for temporary construction-related conflicts with emergency response by ensuring that access is maintained, construction traffic is managed in an orderly manner, and potentially disruptive activities are coordinated in advance with the City and emergency service providers.

Operation
The Project would receive fire protection services through an existing JPA with BFD and KCFD.

Calls for service from the Project Site would be addressed by BFD and KCFD. The Project driveways and internal drive aisles would be constructed pursuant to the City’s design standards and subject to review by the City and BFD. BFD would review the Project for access requirements concerning minimum roadway width, access roads, fire lanes, signage, access devices and gates, and access walkways, among other requirements, which would enhance emergency access to the Project Site. Furthermore, compliance with the fire code and local ordinances would ensure that the Project would not impair an adopted emergency response plan. Through compliance with Riverview Marketplace Commercial Project
Environmental Impact Report 4.16 Transportation
City of Bakersfield – SCH No. 2025101507 4.16-19
City, KCFD and BFD access requirements and, adequate emergency access to the Project Site would be provided. Project impacts concerning emergency access would be less than significant.

Project Design Features
Project Design Feature TRAF-PDF-1: Construction Traffic Management Plan.

The contractor would develop a detailed Construction Traffic Management Plan as part of the Project, including provision of construction worker parking in designated areas, temporary traffic controls during all construction activities adjacent to public rights-of-way, street closure information, detour plans, haul routes, and staging plans among other provisions. The contractor would submit the Construction Traffic Management Plan to the City of Bakersfieldfor approval.

The Construction Management Plan would include the following:
• Scheduling workdays to begin and end prior to the morning and afternoon peak hours, respectively, to the extent feasible so as to avoid worker trips during those peak hours. • Coordination with various City departments and offices to ensure adequate access to the Project Site and land uses in proximity of the Project Site is maintained. • Scheduling pick-ups, deliveries, and exports of construction materials so as to occur during off-peak hours. Hauling shall be from 9:00 A.M. to 3:00 P.M. weekdays, and 8:00 A.M. to 4:00 P.M. on Saturdays. No hauling shall be performed on Sundays and holidays. • Reduce the potential of trucks waiting for extended periods to load or unload. • Provision of worker parking on-site or in designated off-site private parking areas and prohibition of construction-related vehicle parking on surrounding streets, other than the streets adjacent to the Project Site.
• Temporary traffic controls during all construction activities adjacent to public ROWs to improve traffic flow on public roadways (e.g., flag personnel) and to maintain access for land uses in the vicinity of the Project Site. Determine the number and location of flag personnel required during traffic rerouting and deliveries. • Contractor to post advance bilingual notification to adjacent property owners and occupants of upcoming construction activities, including durations and daily hours of operation, at several locations on the Project Site.
• Establish requirements for storage of materials and loading/unloading on the Project Site. • Worksite traffic control plans approved by the City would be implemented to route vehicles, bicyclist and pedestrians around the area during any parking, travel lane or sidewalk closures and provide for protective measures for the public. • Identification of a construction manager and provision of a telephone number for any inquiries or complaints from residents regarding construction activities. The telephone number shall be posted at the site readily visible to any interested party during site preparation, grading, and construction.

Mitigation Measures
None required.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.16 Transportation
City of Bakersfield – SCH No. 2025101507 4.16-20
Level of Significance After Mitigation
Less than significant impact with no mitigation required.

Cumulative Impacts
Impact Analysis
Section 3.3, Cumulative Development, identifies projects that are planned, under construction, or have been recently completed. A summary of these projects is provided in Table 3-1, Cumulative Projects List. Potential cumulative impacts would occur if the proposed Project in combination with the identified cumulative projects would result in significant effects to Transportation. For purposes of this analysis, the geographic scope would be the City of Bakersfield.

As described under Threshold TRA-1, the Project would not conflict with a program, plan, ordinance, or policy addressing the circulation system, including transit, roadway, bicycle, and pedestrian facilities. The Project site would be served by existing transit systems and would not conflict with existing transit. Moreover, the Project would implement pedestrian and bicycle facility improvements consistent with the General Plan. Additionally, the analysis in this section demonstrates that the Project would be consistent with LOS requirements of the General Plan through the Project’s improvements and contributions to the Bakersfield RTIF program.

Development within the Project area would be required to comply with all applicable program, plans, ordinances, or policies addressing the circulation system, including transit, roadway, bicycle, and pedestrian facilities. Therefore, the Project in combination with the related projects would result in less than significant cumulative impacts in respect to identified programs, plans, policies, and ordinances.

Similar to the Project any related project that would be subject to environmental review would be required to evaluate VMT on a project-by-project basis. If the related project were determined to have potentially significant VMT impacts, it would be required to include appropriate mitigation measures to reduce VMT impacts to a less than significant level if available. The Project would result in a significant and unavoidable impact to VMT. Given that the Countywide cumulative VMT is already significant, the Project’s significant and unavoidable impact would be cumulatively considerable.

With regard to design hazards, the Project would not result in a significant impact for geometric hazards. The proposed Project driveways and internal drive aisles for the proposed Project and others would be constructed pursuant to the City’s design standards and subject to review by BFD. In addition, all circulation improvements would be constructed as approved by the City’s Public Works Department. Additionally, sight distance at each project access point should be reviewed with respect to standard Caltrans sight distance standards at the time of preparation of final grading, landscape, and street improvement plans. Therefore, the Project’s contribution to cumulative impacts associated with hazardous design conditions would not be considerable.

With regard to emergency access, the Project would not result in a significant impact. The proposed Project driveways and internal drive aisles would be constructed pursuant to the City’s design standards and subject to review by BFD which would review the Project for access requirements concerning minimum roadway width, access roads, fire lanes, signage, access devices and gates, and access walkways, among other requirements. The Project Site and the surrounding area are located in an established urban area that is well-served by the surrounding roadway network, and multiple routes exist in the area for emergency vehicles and evacuation.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.16 Transportation
City of Bakersfield – SCH No. 2025101507 4.16-21
Furthermore, each of the related projects would be required to comply with City access requirements. As such, cumulative impacts on transportation would be less than significant.

Mitigation Measures
No mitigation measures are available.

Level of Significance After Mitigation
Project-specific and cumulative impacts related to conflicts with transportation-related plans, increased hazards due to geometric design, and inadequate emergency access would be less than significant. While Project-specific and cumulative impacts related to VMT would be reduced due to the Project’s features and improvements, impacts would remain significant and unavoidable.
.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.16 Transportation
City of Bakersfield – SCH No. 2025101507 4.16-22
This page intentionally left blank.

City of Bakersfield – SCH No. 2025101507 4.17-1

4.17 Tribal Cultural Resources
This section discusses potential impacts to tribal cultural resources associated with the proposed Project. Impacts are evaluated based on the Project’s potential to result in substantial adverse change in the significance of a tribal cultural resource (TCR) as defined in Public Resources Code (PRC) Section 21074. PRC Section 21074(a) states:
(a) “Tribal cultural resources” are either of the following:
(1) Sites, features, places, cultural landscapes, sacred places, and objects with cultural value to a California Native American tribe that are either of the following
(A) Included or determined to be eligible for inclusion in the California Register of Historical Resources.
(B) Included in a local register of historical resources as defined in subdivision (k) of Section 5020.1.
(2) A resource determined by the lead agency, in its discretion and supported by substantial evidence, to be significant pursuant to criteria set forth in subdivision (c) of Section 5024.1. In applying the criteria set forth in subdivision (c) of Section 5024.1 for the purposes of this paragraph, the lead agency shall consider the significance of the resource to a California Native American tribe.
(b) A cultural landscape that meets the criteria of subdivision (a) is a tribal cultural resource to the extent that the landscape is geographically defined in terms of the size and scope of the landscape.
(c) A historical resource described in Section 21084.1, a unique archaeological resource as defined in subdivision (g) of Section 21083.2, or a “nonunique archaeological resource” as defined in subdivision (h) of Section 21083.2 may also be a tribal cultural resource if it conforms with the criteria of subdivision (a).

Per the requirements of AB 52/SB 18, public agencies must consult with California Native American tribes during the CEQA process in order to identify potential impacts to TCRs. Upon receiving NOP, the NAHC provided a response detailing the AB 52/SB 18 consultation process on October 31, 2025. The process for consultation follows this process:
• A California Native American Tribe asks agencies in the geographic area with which it is traditionally and culturally affiliated to be notified about projects. Tribes must ask in writing for consultation.
• Within 14 days of deciding to undertake a project or determining that a project application is complete, the lead agency must provide formal written notification to all Tribes who have requested it.
• A Tribe must respond within 30 days of receiving the notification if it wishes to engage in consultation.
• The lead agency must initiate consultation within 30 days of receiving the request from the Tribe.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.17 Tribal Cultural Resources City of Bakersfield – SCH No. 2025101507 4.17-2
• Consultation concludes when both parties have agreed on measures to mitigate or avoid a significant effect to a TCR, or a party, after a reasonable effort in good faith, decides that mutual agreement cannot be reached.
• Regardless of the outcome of consultation, the CEQA document must disclose significant impacts on TCRs and discuss feasible alternatives or mitigation that avoid or lessen the impact.

4.17.1 Regulatory Setting
State
California Register of Historical Resources (Public Resource Code Section 5024.1 et seq.) State law protects cultural resources by requiring evaluations of the significance of historical resources in CEQA documents. A cultural resource is an important historical resource if it meets any of the criteria found in section 15064.5(a) of the State CEQA Guidelines. The California Register of Historic Resources (CRHR) is maintained by the state Office of Historic Preservations.

The following resources are automatically included in the CRHR: properties listed, or formally designated eligible for listing, on the National Register of Historic Places; state historical landmarks; and points of interest recommended for listing in the CRHR by the State Historical Resources Commission (SHPO). Additionally, resources included in a local register of historical resources or deemed significant are presumed to be historically or culturally significant for purposes of CEQA.

For purposes of CEQA, a historical resource is any object, building, structure, site, area, place, record, or manuscript listed in or eligible for listing in the CRHR (Public Resources Code [PRC] section 21084.1). A resource is eligible for listing in the CRHR if it meets any of the following criteria:

1. Is associated with events that have made a significant contribution to the broad patterns of California’s history and cultural heritage.

2. Is associated with the lives of persons important in our past.

3. Embodies the distinctive characteristics of a type, period, region, or method of construction, or represents the work of an important creative individual, or possesses high artistic values.

4. Has yielded, or may be likely to yield, information important in prehistory or history.

The California Code of Regulations (CCR) further provides that cultural resources of local significance are CRHR-eligible (Title 14 CCR, section 4852).

Assembly Bill 52 (Public Resources Code Section 21080.3.1) The Native American Historic Resource Protection Act (AB 52) took effect July 1, 2015, and incorporates tribal consultation and analysis of impacts to TCRs into the CEQA process. It requires TCRs to be analyzed similar to other CEQA topics and establishes a consultation process for lead agencies and California Tribes. Projects that require a Notice of Preparation of an EIR or Notice of Intent to adopt a ND or MND are subject to AB 52. A significant impact on a TCR is considered a significant environmental impact, requiring adoption and implementation of feasible mitigation measures.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.17 Tribal Cultural Resources City of Bakersfield – SCH No. 2025101507 4.17-3
As described above, TCRs are defined in one of two ways. Either the TCR qualifies as a historical resource according to PRC § 5024.1, or the TCR is defined by the lead agency, as long as the lead agency supports its determination with substantial evidence and considers the resource’s significance to a California Tribe. PRC § 21080.3.1(b) establishes the process for engaging in consultation with California Native American Tribes. The following describes the process for consultation:
(b) Prior to the release of a negative declaration, mitigated negative declaration, or environmental impact report for a project, the lead agency shall begin consultation with a California Native American tribe that is traditionally and culturally affiliated with the geographic area of the proposed project if:
(1) the California Native American tribe requested to the lead agency, in writing, to be informed by the lead agency through formal notification of proposed projects in the geographic area that is traditionally and culturally affiliated with the tribe, and (2) the California Native American tribe responds, in writing, within 30 days of receipt of the formal notification, and requests the consultation. When responding to the lead agency, the California Native American tribe shall designate a lead contact person. If the California Native American tribe does not designate a lead contact person, or designates multiple lead contact people, the lead agency shall defer to the individual listed on the contact list maintained by the Native American Heritage Commission for the purposes of Chapter 905 of the Statutes of 2004. For purposes of this section and Section 21080.3.2, “consultation” shall have the same meaning as provided in Section 65352.4 of the Government Code.
(c) To expedite the requirements of this section, the Native American Heritage Commission shall assist the lead agency in identifying the California Native American tribes that are traditionally and culturally affiliated with the project area. (d) Within 14 days of determining that an application for a project is complete or a decision by a public agency to undertake a project, the lead agency shall provide formal notification to the designated contact of, or a tribal representative of, traditionally and culturally affiliated California Native American tribes that have requested notice, which shall be accomplished by means of at least one written notification that includes a brief description of the proposed project and its location, the lead agency contact information, and a notification that the California Native American tribe has 30 days to request consultation pursuant to this section. (e) The lead agency shall begin the consultation process within 30 days of receiving a California Native American tribe’s request for consultation.

Senate Bill 18, (SB18) Traditional Tribal Cultural Places Act Senate Bill 18 (SB 18) requires local (city and county) governments to consult with California Native American tribes to aid in the protection of traditional tribal cultural places (“cultural places”) through local land use planning. SB 18 also requires the Governor’s Office of Planning and Research (OPR) to include in the General Plan Guidelines advice to local governments for how to conduct these consultations. The intent of SB 18 is to provide California Native American tribes an opportunity to participate in local land use decisions at an early planning stage, for the purpose of protecting, or mitigating impacts to, cultural places. The purpose of involving tribes at these early planning stages is to allow consideration of cultural places in the context of broad local land use policy, before individual site specific, project-level land use decisions are made by a local Riverview Marketplace Commercial Project
Environmental Impact Report 4.17 Tribal Cultural Resources City of Bakersfield – SCH No. 2025101507 4.17-4
government. SB 18 requires local governments to consult with tribes prior to making certain planning decisions and to provide notice to tribes at certain key points in the planning process.

This consultation and notice requirements apply to adoption and amendment of both general plans (defined in Government Code § 65300 et seq.) and specific plans (defined in Government Code §65450 et seq.). Although SB 18 does not specifically mention consultation or notice requirements for adoption or amendment of specific plans, existing state planning law requires local governments to use the same processes for adoption and amendment of specific plans as for general plans (see Government Code § 65453). Therefore, where SB 18 requires consultation and/or notice for a general plan adoption or amendment, the requirement extends also to a specific plan adoption or amendment.

California Health and Safety Code (Section 7050.5)
The State of California regulates the accidental discovery of human remains. Section 7050.5 of the Health and Safety Code states:

In the event of discovery or recognition of any human remains in any location other than a dedicated cemetery, there shall be no further excavation…until the coroner…has determined…that the remains are not subject to…provisions of law concerning investigation of the circumstances, manner and cause of any death, and the recommendations concerning the treatment and disposition of the human remains have been made to the person responsible. The coroner shall make his or her determination with two working days from the time the person responsible for the excavation, or his or her authorized representative, notifies the coroner of the discovery or recognition of the human remains. If the coroner determines that the remains are not subject to his or her authority and…has reason to believe that they are those of a Native American, he or she shall contact, by telephone within 24 hours, the Native American Heritage Commission.

Local
Metropolitan Bakersfield General Plan
The General Plan, dated December 2002, was updated in January 2016 per Resolution No. 018- 16 and 019-16. At the time this EIR was published for public review, the City was in the process of updating its Bakersfield 2045 General Plan, but it had not yet been adopted. The General Plan includes goals, policies, and directions to achieve the City’s vision of the community and future development. The General Plan includes 12 elements that focus on: Land Use; Circulation; Housing; Conservation; Noise; Safety; Downtown Redevelopment; Public Services Facilities; Open Space; Parks; Kern River Plan; and Historical Resources.

Bakersfield Register of Historic Places
The City of Bakersfield has established the Bakersfield Register of Historic Places (BRHP) includes properties within city limits that are listed in the National Register of Historic Places (NRHP), as well as locally designated Cultural Resources and Areas of Historic Interest.1 Any improvement, building, sign, feature, site, place, or object may be designated as a Cultural Resource and any grouping of such may be designated as a historic district or an area of historic interest if it meets one or more of the following criteria:
1 Historic Resources Group. 2025. City of Bakersfield Historic Resources Survey Report. https://content.civicplus.com/api/assets/ca-bakersfield/ba550d64-0acd-4521-bd0e-139bfabf36bd?cache=1800/ (Accessed June 24, 2026).

Riverview Marketplace Commercial Project
Environmental Impact Report 4.17 Tribal Cultural Resources City of Bakersfield – SCH No. 2025101507 4.17-5
a. It exemplifies or reflects special elements of the city, community or neighborhood’s historical, archaeological, cultural, social, economic, political, aesthetic, engineering or architectural development; or
b. It is identified with persons or events significant in local, state, or national history; or c. It embodies distinctive characteristics of style, type, period, or method of construction, or is a valuable example of the use of indigenous materials or craftsmanship; or d. It is representative of the notable work of a builder, designer, architect, engineer, landscape architect, interior designer, artist or craftsman; or e. Its unique location or singular physical characteristic(s) represents an established and familiar visual feature of a neighborhood, community or the city; or f. It is an archaeological or paleontological site which has the potential of yielding information of scientific value. 2

4.17.2 Environmental Setting
As described in Chapter 2, Project Description, the Project site is located in the northwestern portion of Bakersfield. The approximately 46.16-acre Project site is an undeveloped L-shaped property situated along the south side of Rosedale Highway, north of the railroad tracks, west of Coffee Road, and east of El Toro Viejo Road.

None of the 31 Historic Places listed in the BRHP, CRHP, or NRHP 5 Historic Places listed in the NRHP within the City of Bakersfield are located within the Project Site. Additionally, the Project site is not located within any of the five potential Historic Districts identified in the 2025 Bakersfield Historic Resources Survey Report.
3 4.17.3 Impact Analysis
Methodology
For purposes of identifying potential sacred lands or traditional cultural properties within or near a project site, the City contacted the Native American heritage Commission (NAHC) to conduct a search of the Sacred Lands File (SLF) (see Section 4.6, Cultural Resources). The NAHC provided the City with a list of California Native American Tribes known to have knowledge of the area in which the proposed Project is located.

On March 26, 2026, the City initiated consultation pursuant to AB 52 and SB 18 with representatives of the California Native American Tribes identified by the NAHC. Tribes contacted included those within the jurisdiction of the City as well as those traditionally and culturally affiliated to the geographic area where a project is located. 2 Bakersfield Municipal Code Section 15.72.050
3 Historic Resources Group. 2025. City of Bakersfield Historic Resources Survey Report. https://content.civicplus.com/api/assets/ca-bakersfield/ba550d64-0acd-4521-bd0e-139bfabf36bd?cache=1800/ (Accessed June 24, 2026).

Riverview Marketplace Commercial Project
Environmental Impact Report 4.17 Tribal Cultural Resources City of Bakersfield – SCH No. 2025101507 4.17-6
Thresholds of Significance
The City utilizes the California Environmental Quality Act (CEQA) Guidelines, Appendix G, and thresholds of significance4to analyze the environmental impacts of the Project. Per CEQA Guidelines, an impact is considered significant if the Project would:
• Cause a substantial adverse change in the significance of a TCR, defined in Public Resources Code § 21074 as either a site, feature, place, cultural landscape that is geographically defined in terms of the size and scope of the landscape, sacred place, or object with cultural value to a California Native American tribe, and that is:
o Listed or eligible for listing in the California Register of Historical Resources, or in a local register of historical resources as defined in Public Resources Code section 5020.1(k), or
o A resource determined by the lead agency, in its discretion and supported by substantial evidence, to be significant pursuant to criteria set forth in subdivision (c) of Public Resources Code § 5024.1. In applying the criteria set forth in subdivision (c) of Public Resource Code § 5024.1, the lead agency shall consider the significance of the resource to a California Native American tribe.

Project Impacts
Threshold TCR-1: Would the project cause a substantial adverse change in the significance of a tribal cultural resource, defined in Public Resources Code § 21074 as either a site, feature, place, cultural landscape that is geographically defined in terms of the size and scope of the landscape, sacred place, or object with cultural value to a California Native American tribe, and that is listed or eligible for listing in the California Register of Historical Resources, or in a local register of historical resources as defined in Public Resources Code section 5020.1(k)?
Threshold TCR-2: Would the project cause a substantial adverse change in the significance of a tribal cultural resource, defined in Public Resources Code § 21074 as either a site, feature, place, cultural landscape that is geographically defined in terms of the size and scope of the landscape, sacred place, or object with cultural value to a California Native American tribe, and that is a resource determined by the lead agency, in its discretion and supported by substantial evidence, to be significant pursuant to criteria set forth in subdivision (c) of Public Resources Code § 5024.1. In applying the criteria set forth in subdivision (c) of Public Resource Code § 5024.1, the lead agency shall consider the significance of the resource to a California Native American tribe?
Impact Analysis
As discussed in Appendix D, the existing structures and previously identified historic archaeological site on the Project Site have been determined to not be eligible for listing in either 4 Association of Environmental Professionals (AEP). 2025. CEQA Guidelines Appendices, Appendix G: Environmental Checklist Form. Available at: https://www.califaep.org/docs/CEQA_Handbook_2025combined.pdf. Accessed January 2026.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.17 Tribal Cultural Resources City of Bakersfield – SCH No. 2025101507 4.17-7
the CRHR, or in a in a local register of historical resources. Therefore, the Project does not contain any resources that are likely to have historic significance.

A search of the SLF was conducted through the NAHC to determine if any sacred lands or traditional cultural properties on file with the NAHC were within or near the Project Site. The NAHC’s SLF record search was negative, indicating that there is no record of sacred lands on the Project Site.5
In compliance with AB 52/SB 18 the City provided formal notification to California Native American tribal representatives identified by the NAHC. Native American groups may have knowledge about the area’s cultural resources and may have concerns about a development’s adverse effects on TCRs.
6 AB 52/SB 18 allows tribes 30 days after receiving notification to request consultation. On March 26, 2026, the City contacted representatives of the following tribes:
• Santa Rosa Rancheria
• Kitanemuk & Yowlumne Tejon Indians
• Kawaiisu Tribe
• Tubaltulabals of Kern Valley
• Tule River Indian Tribe
• Chumash Council of Bakersfield
• Tejon Indian Tribe
• Kern Valley Indian Council
• Chalon Indian Council of Bakersfield
The above listed Tribes did not respond to the request for consultation and have opted out of the AB 52 and SB 18 consultation process. Therefore, the City has completed tribal consultation as provided for by AB 52/SB 18.
7 Outgoing correspondence to representatives is included in Appendix K, Tribal Correspondence though no response has been received.

Although no TCRs were identified in the Project Site, ground-disturbing activities have the potential to reveal buried TCRs not observed on the surface. Therefore, the Project would implement Mitigation Measures (MM) CUL-1 and CUL-2. MM CUL-1 would require that field personnel be alerted to the possibility of buried prehistoric or historic cultural deposits prior to initiation of ground-disturbing activities. MM CUL-1 would also provide a process for treatment of any archaeological resources inadvertently discovered during Project implementation.

Implementation of MM CUL-1 shall also require a cessation of construction activity and consultation with a qualified archaeologist to evaluate the Project Site and make the necessary findings. MM CUL-2, would require a cessation of construction activity in the event of an inadvertent discovery of human remains until the County coroner can evaluate the discovery and made the necessary findings. MM CUL-2 would also provide a process for treatment of any human remains inadvertently discovered during Project implementation. With implementation of 5 Native American Heritage Commission. October 28, 2022. [Native American Heritage Commission Letter and Native American Tribal Consultation List].
6 California PRC section 21074
7 California PRC section 21080.3.2(b)(1)
Riverview Marketplace Commercial Project
Environmental Impact Report 4.17 Tribal Cultural Resources City of Bakersfield – SCH No. 2025101507 4.17-8
MM CUL-1 and MM CUL-2, impacts to TCRs remains would be less than significant with mitigation incorporated.

Mitigation Measures
The following mitigation measures are applicable to the Project and would be implemented to reduce impacts to a less than significant level.

MM CUL-1 Inadvertent Discovery of Cultural Resources. If suspected cultural resources are encountered during ground disturbance activities, all work within 100 feet of the find shall immediately cease and the area cordoned off until a qualified cultural resource specialist that meets the Secretary of the Interior’s Professional Qualification Standards can evaluate the find and make recommendations. If the specialist determines that the discovery represents a potentially significant cultural resource, additional investigations may be required. If cultural resources are discovered that may have relevance to Native Americans, the specialist or Project Applicant shall provide written notice to the City of Bakersfield, Native American Heritage Commission, and any other appropriate individuals, agencies, and/or groups as determined by the specialist in consultation with the City of Bakersfield to receive input regarding treatment and disposition of the resource, which may include avoidance, testing, and/or excavation to prevent destruction of the resource and/or to allow documentation of the resource for research potential. All reports, correspondence, and determinations regarding the discovery shall be submitted to the California Historical Resources Information System’s Southern San Joaquin Valley Information Center at California State University Bakersfield.

MM CUL-2 Inadvertent Discovery of Human Remains. During construction, if human remains are discovered, further ground disturbance shall be prohibited pursuant to California Health and Safety Code Section 7050.5.

The specific protocol, guidelines, and channels of communication outlined by the Native American Heritage Commission, in accordance with Health and Safety Code Section 7050.5, Public Resources Code 5097.97, and Senate Bill 447 shall be followed. In the event of the discovery of human remains, at the direction of the county coroner, Health and Safety Code Section 7050.5(c) shall guide Native American consultation. Unless otherwise required by law, the site of any reburial of Native American human remains or associated grave goods shall not be disclosed and shall not be governed by public disclosure requirements of the California Public Records Act. The coroner, pursuant to the specific exemption set forth in California Government Code Section 6254 (r), parties, and Lead Agencies, will be asked to withhold public disclosure information related to such reburial, pursuant to the specific exemption set forth in California Government Code Section 6254 (r).

Level of Significance After Mitigation
Less than significant with mitigation incorporated.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.17 Tribal Cultural Resources City of Bakersfield – SCH No. 2025101507 4.17-9
Cumulative Impacts
The geographic scope of the cumulative TCRs analysis is the Project Site and surrounding area as evaluated in the CRA. Impacts to TCRs are generally site-specific because the integrity of any specific TCR is often dependent upon the activities occurring in its immediate vicinity. As discussed, no TCRs have been identified on the Project site, and thus, the Project would have neither a direct nor indirect impact on TCR. Accordingly, the Project would not contribute cumulatively to impacts to TCRs.

The cumulative projects identified in Section 3.3, Cumulative Development, would all likely require some level of excavation with potential for disturbance of subsurface archaeological resources or human remains. As discussed in discussion of Impact TCR-1 and Impact TCR-2, the proposed Project would implement MM CUL-1 and MM CUL-2 and comply with applicable regulations pertaining to the inadvertent discovery and proper treatment of these resources. This would reduce any potential impacts to less than significant. Likewise, the cumulative projects would be required to comply with applicable federal, State, and local regulations pertaining to these resources. Therefore, cumulative impacts are less than significant with mitigation incorporated.

Mitigation Measures
Implement MM CUL-1 and MM CUL-2.

Level of Significance After Mitigation
Cumulative impacts related to cultural resources would be less than significant with implementation of MM CUL-1 and MM CUL-2.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.17 Tribal Cultural Resources City of Bakersfield – SCH No. 2025101507 4.17-10
This page intentionally left blank.

City of Bakersfield – SCH No. 2025101507 4.18-1

4.18 Utilities and Service Systems
This section examines the public utilities and service systems that would be used by the Project and describes potential impacts due to the implementation of the Project. Information to support the analysis is based on the Water Supply and Demand Analysis prepared for the Project by Placeworks, May 2026, contained Appendix I-1 and the Sewer Area Study prepared by Kimley-Horn May 2026 contained in Appendix I-3. In addition, a technical report addressing energy was prepared for the Project and is included as Appendix B, Air Quality, Greenhouse Gas Emissions, and Energy Technical Study.

4.18.1 Regulatory Setting
Federal
Federal Safe Drinking Water Act
The Safe Drinking Water Act (SDWA)(Pub. L. 93-523) is intended to protect public health by regulating the nation’s public drinking water supply. The SDWA authorizes the U.S.EPA to set national standards for drinking water to protect against both naturally occurring and man-made contaminants.

State
California Safe Drinking Water Act
The State’s Safe Drinking Water Act (Health & Saf. Code §§ 116270-116755), charges the California Department of Health Services (DHS) primary enforcement responsibility for the State’s drinking water supply. Title 22 of the California Code of Regulations (CCR) (Division 4, Chapter 15, “Domestic Water Quality and Monitoring Regulations”) established DHS authority and provides drinking water quality and monitoring requirements, which are equal to or more stringent than federal standards.

California Recycled Water Regulations
The regulation of recycled water is vested by State law in the State Water Resources Control Board (SWRCB) and the California Department of Public Health Services (DPH). DPH is responsible for regulating the use of recycled water. Title 17 (California Water Code, §§ 13500– 13556) regulates the protection of the potable water supply through the control of cross-connections with potential contaminants, including recycled water. The established water quality standards and treatment reliability criteria for recycled water are codified in Title 22 of the California Water Code. The requirements of Title 22, as revised in 1978, 1990, and 2001, establish the quality and/or treatment processes required for a recycled effluent to be used for a non-potable application. In addition to recycled water uses and treatment requirements, Title 22 addresses sampling and analysis requirements at the treatment plant, preparation of an engineering report prior to production or use of recycled water, general treatment design requirements, reliability requirements, and alternative methods of treatment.

Urban Water Management Planning Act
The Urban Water Management Planning Act (UWMP) (California Water Code, Division 6, Part

2.6, § 10610 et seq.) was enacted in 1983. The UWMP Act applies to municipal water suppliers that serve more than 3,000 customers or provide more than 3,000 acre-feet per year (AFY) of water. The UWMP Act requires these suppliers to update their Urban Water Management Plan Riverview Marketplace Commercial Project
Environmental Impact Report 4.18 Utilities and Services Systems City of Bakersfield – SCH No. 2025101507 4.18-2
(UWMP) every five years to demonstrate an appropriate level of reliability in supplying anticipated short-term and long-term water demands during normal, dry, and multiple dry years.

Assembly Bill 1668 and Senate Bill 606 – May 31, 2018
AB 1668 and SB 606 establish guidelines for efficient water use and a framework for the implementation and oversight of water standards that were to be in effect in 2022. The two bills strengthen the State’s water resiliency in the face of future droughts with provisions that include:
• Establishing water use objectives and long-term standards for efficient water use that apply to urban retail water suppliers; comprised of indoor residential water use, outdoor residential water use, commercial, industrial and institutional (CII) irrigation with dedicated meters, water loss, and other unique local uses.
• Providing incentives for water suppliers to recycle water. • Identifying small water suppliers and rural communities that may be at risk of drought and water shortage vulnerability and provide recommendations for drought planning. • Requiring both urban and agricultural water suppliers to set annual water budgets and prepare for drought.

Senate Bill 610
SB 610 requires public water suppliers to prepare Water Supply Assessments (WSAs) for large-scale development projects before they can be approved. They are required for any project that is subject to CEQA and proposes (1) residential development of more than 500 dwelling units; (2) commercial development of more than 250,000 square feet of floor space; (3) a retail center with more than 500,000 square feet of floor space; (4) a hotel or motel having more than 500 rooms; (5) an industrial, manufacturing, or processing plant, or industrial park planned to house more than 1,000 persons, occupying more than 40 acres of land, or having more than 650,000 square feet of floor area; (6) a mixed-use project that includes one or more of the projects specified above; or (7) a project that will demand an amount of water equal to, or greater than, the amount of water required by 500 dwelling units.

California Integrated Waste Management Act
The California Integrated Waste Management Act (Assembly Bill [AB] 939) was enacted in 1989 to reduce solid waste generated in California to the maximum extent feasible. AB 939 required counties, cities, and regional solid waste management agencies to develop plans and implement programs to divert 25 percent of their solid waste from landfills by 1995 and 50 percent by 2000.

Diversion is expected to be achieved through source reduction, recycling, and composting, and requires the participation of public agencies, as well as residential, commercial, and industrial users. Since 2000, subsequent legislation mandated that the 50 percent reduction goal be met annually.

AB 939 requires all California counties and cities to prepare solid waste management programs that include Source Reduction and Recycling Elements. Each jurisdiction is required to produce annual reports documenting steps taken to meet the requirements of AB 939.

California Solid Waste Reuse and Recycling Access Act
The California Solid Waste Reuse and Recycling Access Act of 1991 (AB 1327) required CalRecycle to prepare a model ordinance addressing storage of recyclable materials for Riverview Marketplace Commercial Project
Environmental Impact Report 4.18 Utilities and Services Systems City of Bakersfield – SCH No. 2025101507 4.18-3
development projects. The model ordinance was intended to be adoption by California counties and cities to help them meet the requirements of AB 939. Under AB 1327, applications for building permits for development projects must include adequate and accessible areas for the collection and loading of recyclable materials.

CALGreen (California Green Building Code)
In an effort to reduce greenhouse gas emissions and fight against climate change, the State of California Green Building Code (CALGreen) took effect in 2011. CALGreen mandates energy efficiency, water efficiency, and resource conservation measures for all newly constructed commercial and residential projects. CALGreen applies to all residential, commercial, hospital and school buildings to ensure that every new building in California is built using environmentally advanced construction practices, including construction waste diversion requirements, as follows:
• Submit a Construction Waste Management Plan prior to construction for approval by the local Building Department.
• Recycle and/or Reuse a minimum of 65 percent of construction & demolition waste. • Recycle or Reuse 100 percent of tree stumps, rocks and associated vegetation and soils resulting from land clearing
Local
Metropolitan Bakersfield General Plan
The following goals and policies contained in Chapter X (10), “Public Services and Facilities Element,” of the Metropolitan Bakersfield General Plan (MBGP) (City of Bakersfield 2002) may be applicable to the Project.

General Utility Service
Goal 1: Maintain a coordinated planning and implementation program for the provision of public utilities to the planning area.

Policy 3: Municipal-type utility services within the city’s sphere of influence (or designated urban area) should be provided.

Policy 5: Require all new development to pay its pro rata share of the cost of necessary expansion in municipal utilities, facilities and infrastructure for which it generates demand and upon which it is dependent.

Water Distribution
Goal 1: Ensure the provision of adequate water service to all developed and developing portions of the planning area.

Policy 1: Reach agreement regarding mutually beneficial improvements in domestic water service and distribution facilities as required to improve overall metropolitan water service capabilities.

Policy 2: Continue to provide domestic water facilities which are contributed directly by developers, through development and/or availability fees.

Policy 3: Require that all new development proposals have an adequate water supply available.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.18 Utilities and Services Systems City of Bakersfield – SCH No. 2025101507 4.18-4
Sewer Service
Goal 1: Ensure the provision of adequate sewer service to serve the needs of existing and planned development in the planning area.

Goal 3: Provide trunk sewer availability to and treatment/disposal capacity for all metropolitan urban areas, to enable cessation or prevention of the use of septic tanks where such usage creates potential public health hazards or may impair groundwater quality, and to assist in the consolidation of sewerage systems. Provide sewer service for urban development regardless of jurisdiction.

Storm Drainage
Goal 2: Maintain a comprehensive storm drainage system which serves all urban development within the planning area.

Policy 2: The city and county should pursue individual drainage plans where they are most needed.

Solid Waste
Goal 1: Ensure the provision of adequate solid waste disposal services to meet the demand for these services in the planning area.

Goal 2: Evaluate, and develop as feasible, resource recovery and recycling systems.

Policy 1: Comply with, and update as required, the adopted county solid waste management plan.

4.18.2 Environmental Setting
The following sections describe existing utility services for the Project site. Utilities described include water supply, solid waste, wastewater, electricity and natural gas, and telecommunications.

Water Service Distribution
The City’s Water Resources Department operates a Domestic Water System and a Wholesale Water System. The Domestic Water System is a retail water supplier that operates under a service contract with California Water Service (Cal Water). The service area boundaries for the Domestic Water System include only a portion of the City of Bakersfield. Remaining areas of the City are served by other retail water suppliers. The primary source of supply for the Domestic Water System is groundwater and recharged surface water pumped from City owned wells. This is supplemented by surface water supplies from treatment plants owned by Cal Water and Kern County Water Agency Improvement District No. 4’s (KCWA ID4). The surface water conveyed to the treatment water plants is from Kern River supplies and the State Water Project (SWP) supplies. In 2020, the City’s Domestic Water System service area consisted of 48,140 municipal connections and supplied a volume of 45,649 acre-feet (AF).

The City’s Wholesale Water System, which is also operated by the City’s Water Resources Department, oversees the City’s Kern River water rights and water supplies. The service area for this system includes all land within the City’s boundaries. The Kern River water supplies are transported though the Kern River channel and canal systems for delivery to Cal Water’s North Garden and Northeast Bakersfield Water Treatment Plants. The Henry C. Garnett Water Riverview Marketplace Commercial Project
Environmental Impact Report 4.18 Utilities and Services Systems City of Bakersfield – SCH No. 2025101507 4.18-5
Purification Plant receives surface water from the SWP. When SWP supplies are not available, the City is able to deliver its Kern River supplies for treatment in place of SWP supplies. Kern water supplies are also delivered to groundwater replenishment areas such as the City’s 2,800- acre recharge facility. Kern River water that is replenished to the groundwater basin benefits the City and other retail water suppliers that operate groundwater wells. A volume of 77,528 AF of Kern River surface water was delivered through the Wholesale Water System in 2020.

The City also maintains approximately 400 stormwater basins that capture precipitation and recharge the groundwater basin. These stormwater basins are estimated to capture and recharge 16,000 acre-feet per year (afy) of stormwater runoff on average. Approximately 4,272 afy of additional stormwater runoff is captured and diverted into the Kern River and unlined canals annually. This captured stormwater becomes part of the City’s groundwater and recharged water supplies.

Additionally, wastewater generated within the Domestic Water System service area is collected and transported to the City’s Wastewater Treatment Plant (WWTP) No. 3, which provides undisinfected secondary and tertiary treatment. Undisinfected secondary effluent is stored in percolation ponds and used for agricultural irrigation. Tertiary treated effluent is used for landscape irrigation on City owned property. WWTP No. 3 serves areas located both within and outside of the Domestic Water System service area.

In 2020, 7,114 AF of undisinfected secondary effluent was delivered for agricultural irrigation use outside of the City’s service area on property owned by the City of Los Angeles. The amount of undisinfected secondary effluent disposed of in percolation ponds at the WWTP No.3 was 12,167 AF. The City used 664 AF of tertiary treated effluent as recycled water for irrigation of landscaping within the Bakersfield Sports Village, a City owned soccer and football complex located within the Domestic Water System service area. On July 17, 2019, the Bakersfield City Council voted not to renew its contract for sale of wastewater for agricultural irrigation use on the farmland owned by the City of Los Angeles when it expires in 2026. This will allow for additional recycled water to be used within the Domestic Water System service area in the future. The City is also planning an expansion of the tertiary treatment capacity at WWTP No. 3 from 2 million gallons per day (MGD) to 8 MGD.

Groundwater
The City pumps groundwater and recharges surface water from the Kern County Subbasin, which is part of the larger San Joaquin Valley Groundwater Basin. The Kern County Subbasin is designated as critically overdrafted and identified as a high-priority basin by the California Department of Water Resources (DWR). It is not currently adjudicated.

The City, along with five other agencies, is a member of the Kern River Groundwater Sustainability Agency (KRGSA) which covers approximately 232,499 acres of land overlying the Kern County Subbasin. The KRGSA was formed in compliance with the Sustainable Groundwater Management Act to cooperatively manage local groundwater in a sustainable manner. KRGSA, along with other GSAs within the Kern County Subbasin, collectively submitted the Draft Kern County Groundwater Sustainability Plan (GSP) which was adopted by DWR in December of 2024.

The GSP aims to maintain water levels above the Minimum Threshold levels to allow the City’s wells to meet the demands of the Domestic Water System while minimizing undesirable results such as declining pump capacity, well inefficiency, water levels falling below pump intakes and pump screens, and degraded water quality. The City’s groundwater operations are subject to compliance with the requirements of the GSP.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.18 Utilities and Services Systems City of Bakersfield – SCH No. 2025101507 4.18-6
Future Water Projects
Optimization of the City’s Kern River supplies to promote the goals of the GSP involves the full use of the City’s available Kern River entitlement. The Kern River Conjunctive Use Optimization project would be implemented over time so that it can be adjusted to meet changing conditions.

The City’s Kern River supplies would be delivered as a first priority to meet demands of the surface water treatment plants with the remaining supplies being recharged to the groundwater basin through the Kern River channel, the 2,800 acre recharge facility, Truxtun Lake, and other City park facilities
Additional Kern River supplies may become available to the City through an Application to Appropriate Water filed with the California State Water Resources Control Board (SWRCB). The Kern River was designated with Fully Appropriated Status (FAS) by the SWRCB in 1964.

However, in February 2010, SWRCB issued an order revising the status of the Kern River, finding that the river was no longer fully appropriated. In anticipation of this action, the City filed an application with the SWRCB to obtain rights to the surplus, unappropriated, and available water in the Kern River.

The City’s intended use of unappropriated water is to have it remain in the Kern River watercourse to support multiple reasonable and beneficial uses, including domestic purposes, municipal and industrial uses, protection of the public interest, environmental purposes, streamflow restoration, constructed wetlands, recreational uses, fish and wildlife restoration, underground aquifer supply, aquifer water quality enhancement, and underground water banking for drought and other emergencies. The SWRCB has not taken action regarding the allocation of surplus, unappropriated Kern River supplies. It is anticipated that this water may be allocated in about 10 to 15 years. If additional Kern River supplies are allocated to the City, they would become a part of the conjunctive use optimization project.

Wastewater
Bakersfield is served by four major wastewater treatment plants. The City operates Wastewater Treatment Plants (WWTPs) Nos. 2 and 3. WWTP No. 2 is a trickling filter facility that serves the area east of State Route (SR) 99. It has a capacity of 25 million gallons per day (mgd), with a current average daily flow of 13.7 mgd. WWTP No. 3 is an activated sludge facility that serves the area west of SR 99, including the Project Site. It has a capacity of 32 mgd and a current average daily flow of 17.3 mgd. In 2010, WWTP No. 3 was upgraded, expanding from 16 mgd to 32 mgd capacity.

Additionally, portions of Bakersfield are also served by two smaller wastewater treatment plants operated by the Kern Sanitation Authority and North of River Sanitary District Number 1; these agencies own and maintain the sewer systems for their respective treatment.

Stormwater
Stormwater drainage policies for Bakersfield reflect the generally flat topography and limited rainfall of the area. While overall annual rainfall amounts are low, highly intense precipitation can occur in Bakersfield, leading to locally significant runoff. The County and City operate and maintain a joint storm drainage system serving metropolitan Bakersfield and a portion of the surrounding unincorporated area. This area is regulated by an NPDES permit; the City and County prepared a Storm Water Management Plan that describes the framework for managing stormwater discharges. As described above, the City maintains approximately 400 stormwater basins that capture precipitation and recharge the groundwater basin. These stormwater basins Riverview Marketplace Commercial Project
Environmental Impact Report 4.18 Utilities and Services Systems City of Bakersfield – SCH No. 2025101507 4.18-7
are estimated to capture and recharge 16,000 acre-feet per year (afy) of stormwater runoff on average. Approximately 4,272 afy of additional stormwater runoff is captured and diverted into the Kern River and unlined canals annually.

Solid Waste
The City of Bakersfield’s Public Works Department Solid Waste Division provides garbage and recycling services to its residents and businesses. Solid waste from the City is transported to the Bena Landfill, which serves all residents within the City limits. The Bena landfill is located approximately 18 miles east of Bakersfield and has a projected 65-to-75-year lifespan and has been in operation since 2010 with a capacity of 70 million cubic yards. This landfill is owned and operated by Kern County. Additional landfills/solid waste services include the Mount Vernon Greenwaste Recycling Facility, which diverts waste from the Bena Landfill as recycled compost and mulch. Hazardous waste facilities are operated by Kern County through a household hazardous waste collection and refuse facility.1
Electricity and Natural Gas
Electrical services in Bakersfield are provided by Pacific Gas & Electric Company. Natural gas services in Bakersfield are provided by Pacific Gas & Electric Company and Southern California Gas Company.

Telecommunications
Broadband and cellular services are provided to residents and businesses from a variety of private companies, including national retailers Spectrum, AT&T, Verizon, and T-Mobile.2

4.18.3 Impact Analysis
Methodology
This analysis is based on the proposed Project’s forecasted utility usage as compared to the existing capacity of utility facilities that serve the Project Site.

Thresholds of Significance
The City utilizes the California Environmental Quality Act (CEQA) Guidelines, Appendix G, and thresholds of significance3to analyze the environmental impacts of the Project. Per CEQA Guidelines, an impact is considered significant if the Project would:
• Require or result in the relocation or construction of new or expanded water, wastewater treatment, or stormwater drainage, electric power, natural gas, or telecommunications facilities, the construction or relocation of which could cause significant environmental effects;
• Have sufficient water supplies available to serve the project and reasonably foreseeable future development during normal, dry and multiple dry years; 1 City of Bakersfield General Plan, Background Report, August 2022 2 City of Bakersfield General Plan, Background Report, August 2022 3 Association of Environmental Professionals (AEP). 2025. CEQA Guidelines Appendices, Appendix G: Environmental Checklist Form. Available at: https://www.califaep.org/docs/CEQA_Handbook_2025combined.pdf. Accessed January 2026.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.18 Utilities and Services Systems City of Bakersfield – SCH No. 2025101507 4.18-8
• Result in a determination by the wastewater treatment provider which serves or may serve the project that it has adequate capacity to serve the project’s projected demand in addition to the provider’s existing commitments;
• Generate solid waste in excess of State and local standards, or in excess of the capacity of local infrastructure or otherwise impair the attainment of solid waste reduction goals; • Comply with federal, state, and local management and reduction statutes and regulations related to solid waste.

Project Impacts
Threshold UTI-1: Would the project require or result in the relocation or construction of new or expanded water, wastewater treatment, or stormwater drainage, electric power, natural gas, or telecommunications facilities, the construction or relocation of which could cause significant environmental effects?
Impact Analysis
Project construction would not require connections to the City’s water or sewer infrastructure.

Construction of the Project would not require electricity to power most construction equipment.

The majority of construction equipment would be gasoline or diesel powered. It is not anticipated that construction equipment used for the Project would be powered by natural gas, and no other natural gas demand is anticipated during construction.

Operation of the Project would connect to existing water, sewer, stormwater, electrical, telecommunications, and natural gas service lines.

Wastewater generated by the Project would be collected and conveyed via the City of Bakersfield’s municipal sewer system, operated by the City’s Wastewater Division. The Project would be served by Wastewater Treatment Plant No. 3 which has a capacity of 25 million gallons per day (mgd), with a current average daily flow of 13.7 mgd.4 As noted in the Sewer Area Study prepared for the Project, the average daily wastewater generated by the Project would be 0.2588 cubic feet per second (cfs) or 167,240 gallons per day.

An existing 36-inch sewer main is located in El Toro Viejo Road. The sewer main traverses south across a vacant parcel and turns west on Brimhall Road and continues to Jewetta Avenue, where it increases in size to a 42-inch main and turns south. The 42-inch main continues south across the Kern River and increases in size to a 48-inch main at Bolthouse Drive. The 48-inch main continues south on Buena Vista Road until it turns east at McCutchen Road. The sewer main continues east to the sewer lift station located at the southeast corner of McCutchen Road and Gosford Road. Sewer flows from the Project would be conveyed onsite through an underground sewer main of various sizes, generally from east to west, connecting to the existing 36-inch main in El Toro Viejo Road. Sewer flows would be conveyed through the existing City system to the lift station at the southeast corner of McCutchen Road and Gosford Road. As noted in the Sewer Area study prepared for the Project, the Project would contribute only 2 percent of the existing sewer flow and 1 percent of the cumulative sewer flow.

Moreover, the Project’s wastewater generation would be well within the available capacity of the Wastewater Treatment Plant No. 3. It should be noted that the Project would comply with all 4 https://www.bakersfieldcity.us/679/Wastewater-Treatment-Plants?contentId=62e69a33-a683-423a-9f57-d6c9db926b18 Riverview Marketplace Commercial Project
Environmental Impact Report 4.18 Utilities and Services Systems City of Bakersfield – SCH No. 2025101507 4.18-9
applicable federal, state, and local wastewater regulations, including the City’s sewer connection requirements and the treatment plants’ NPDES permits.

Regarding water, the Project would connect to an existing 8-inch pipe at Rosedale and Coffee Road. As analyzed Water Supply and Demand Analysis prepared for the Project, according to the City’s 2020 UWMP, the City has adequate supplies to serve all of its customers during normal, dry year, and multiple dry year conditions through 2040. The Project would result in a water demand of 148,925 gallons per day or 166.8acre-feet per year (afy). This is only 8.9 percent of the projected increase in the commercial sector water demand from 2020 to 2030, assuming a buildout date of the project of 2027.

Therefore, as determined in the Water Supply and Demand Analysis, the City will have sufficient water supplies available through the year 2040 to meet all future water demands, including those of the Project. In the event of a water shortage, implementation of the City’s Water Shortage Contingency Plan and demand management measures would ensure that sufficient water supplies are available to serve its customers. The City also has additional water supplies available with implementation of the Kern River Conjunctive Use Optimization Project and an expansion of the recycled water system.

Stormwater in the Bakersfield metropolitan area is managed through a joint MS4 operated by the City of Bakersfield and Kern County under an NPDES permit issued by the Central Valley Regional Water Quality Control Board. The Project would incorporate site-specific drainage improvements consistent with the City’s Storm Water Management Plan and Municipal Code including low-impact development (LID) features and BMPs to control the volume and quality of runoff. Post-development peak flows would be managed on-site to avoid exceeding pre-Project conditions, and runoff would be directed to the existing municipal storm drain system via standard service connections. The Project would comply with all applicable NPDES permit requirements, including construction-phase erosion and sediment control measures and post-construction stormwater quality standards.

As discussed in greater detail in DEIR Section 4.6, Energy, operation of the Project would create additional demands for electricity and natural gas compared to existing conditions. Electrical service to the Project would be provided by PG&E through connections to existing off-site electrical lines and new on-site infrastructure. The Project would have a total electricity demand of 5,968,579 kilowatt hours per year (kWh/yr).

While the Project would result in electricity demand, it would be designed and built to meet the current Building Energy Efficiency Standards and CALGreen, which would contribute to increasing energy efficiency. In accordance with the 2025 Building Energy Efficiency Standards, the Project would install rooftop PV systems and battery storage systems. These systems would contribute an estimated 1,201,933 kWh/yr of onsite renewable electricity to offset a portion of the Project electricity demand from the grid. The on-site PV systems and battery storage—in addition to compliance with the RPS requirements by PG&E to increase electricity from renewable sources in the coming years—would further increase renewable electricity use.

As discussed in greater detail in Section 4.6, Energy, the Project would generate demand for natural gas due to the heating and cooling for the building and for water. The proposed land uses would generate a natural gas demand of 6,150,142 kilo British thermal units per year (kBTU/yr) under full buildout conditions. The Project would result in a net increase in natural gas demands.

However, the Project would be built to meet the current Building Energy Efficiency Standards and CALGreen, which would contribute to optimizing energy efficiency of the proposed buildings.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.18 Utilities and Services Systems City of Bakersfield – SCH No. 2025101507 4.18-10
Telecommunications services in the Project area are provided by multiple carriers include Spectrum, AT&T, Verizon, and T-Mobile. Service to the Project, if selected by the operator, would be extended via standard connections from these existing facilities, with any necessary installation limited to on-site conduit, wiring, and equipment pads. No new or expanded off-site telecommunications facilities such as cell towers, switching stations, or major fiber trunk lines would be required.

Overall, because the Project’s potable water, wastewater, stormwater, electricity, natural gas, and telecommunications demands can all be met by existing municipal and utility infrastructure with only standard on-site connections or minor improvements in previously disturbed area, and without the need for new or expanded off-site facilities that could cause significant environmental effects, impacts related to utilities and service systems would be less than significant. No mitigation measures are required.

Mitigation Measures
None required.

Level of Significance After Mitigation
Less than significant with no mitigation required.

Threshold UTI-2: Would the project have sufficient water supplies available to serve the project and reasonably foreseeable future development during normal, dry and multiple dry years?
Impact Analysis
During Project construction water would be required for dust control and equipment cleaning.

However, it is anticipated that water would be imported and connections to the City’s water infrastructure would not be necessary. In addition, the contractor would install portable restrooms and hand-washing stations which are also anticipated to utilize imported water.

The City of Bakersfield’s water flow rate for commercial and industrial development is used to estimate the proposed project’s water demand. As indicated in Chapter 3 of the City’s Standards and Specifications for Domestic Water Systems, flow requirements for commercial and industrial developments should be calculated by assuming 5 single-family residences per acre. For the Project Site, this amounts to 230 single family units. The City’s Standards and Specifications for Domestic Water Systems indicate that the average daily demand is 185 gallons per capita per day, and flow requirements should be calculated assuming 3.5 persons per dwelling unit.

Therefore, as shown in Table 4.18-1, Project Water Demand, the Project’s total average water demand is 148,925 gallons per day or 166.8 afy.5
5 It should be noted that the project’s Sewer Area Study calculates an average wastewater generation rate for the proposed project of 0.26 cubic feet per second (cfs). This equates to 168,042 gpd. This is slightly larger than the average water demand shown in Table 2 since the sewer study’s intent is to size sewer pipes. Sewer generation rates related to the design of sewer pipes are typically conservative to account for fluctuations in sewer generation to sidestep the risk of exceeding sewer pipe capacities. The City’s commercial average daily sewage discharge is more conservative than the average daily demand for commercial water use.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.18 Utilities and Services Systems City of Bakersfield – SCH No. 2025101507 4.18-11
Table 4.18-1 – Project Water Demand
Use Type
Size
(acres)
Single Family Residence
Equivalent
(dwelling units/acre)
Average Daily
Demand (gallons
per capita per day)
Unit Occupancy
(persons per
dwelling unit)
Water
Demand
(gallons per
day)1
Commercial 46 5 185 3.5 148,925
Source: City of Bakersfield Standards and Specification for Domestic Water Systems, 2022. 1 Total water demand = 46 acres x 5 single family units per acre x 3.5 persons per dwelling unit x 185 gallons per capita per day = 148.925 gallons per day.

City of Bakersfield Water Demands
The source of water for the Project would be existing water supplies provided by the City to its customers. Based on the City’s 2020 UWMP, the current and projected water demands for normal years by customer class for the Domestic Water System are presented in Table 4.18-2. As shown in the table, the City’s Domestic Water System total water demand in 2020 was 45,649 acre feet (AF) for potable and raw water and 664 AF for recycled water. The projected 2040 water demand for potable water is 65,589 AF and the projected recycled water demand is 8,961 AF.

Table 4.18-2 – Current and Projected Potable Water Demands for the Domestic Water System (afy)
Use Type 2020 2025 2030 2035 2040
Single Family 29,986 33,627 36,764 40,194 43,944
Multi-Family 1,534 1,506 1,646 1,800 1,968
Commercial 6,904 8,030 8,780 9,598 10,494
Industrial 314 502 549 600 656
Institutional/Governmental 3,527 4,015 4,390 4,799 5,247 Other 250 502 549 600 656
Water Loss 3,314 2,008 2,195 2400 2,624
Potable and Raw Water
Subtotal
45,649 50,190 54,873 59,991 65,589
Recycled Water Subtotal 664 2,240 8,961 8,961 8,961
Total 46,313 52,340 63,834 68,952 74,550
Source: City of Bakersfield 2020 UWMP, 2021.

Table 4.18-3, shows the water demand projections for the City’s Wholesale Water System. The Wholesale Water System’s 2020 demand was 77,528 AF and the projected 2040 demand is 100,000 AF.

Table 4.18-3 – Current and Projected Potable Water Demands for the Wholesale Water System (afy)
Demand Type 2020 2025 2030 2035 2040
Potable and Raw
Water 77,528 100,000 100,000 100,000 100,000
Source: City of Bakersfield 2020 UWMP, 2021.

The City operates both a Domestic Water System and a Wholesale Water System. The water supply sources for the Domestic Water System are groundwater and recharged surface water supplies pumped from City owned wells and treated surface water from two water treatment plants Riverview Marketplace Commercial Project
Environmental Impact Report 4.18 Utilities and Services Systems City of Bakersfield – SCH No. 2025101507 4.18-12
The Domestic Water System is the focus of this analysis since this is the water available for municipal supply within the project area.

The amount of water that was supplied in 2020 to the City’s Domestic Water System service area is summarized in Table 4.18-4. As shown in the table, approximately 74 percent of the City’s water supply is groundwater, 25 percent is surface water, and one percent is recycled water.

Table 4.18-4 – Actual Water Supplies for the Domestic Water System (afy) Water Supply Source
Additional Detail on Water
Supply
2020
Actual Volume Water Quality
Groundwater City Wells 34,107 Drinking Water
Surface Water (Kern River) Cal Water Northwest
Treatment Plant
2,872 Drinking Water
Surface Water (SWP supplemented by
Kern River)
Henry C. Garnett Water
Purification Plant
8,760 Drinking Water
Recycled Water WWTP No. 3 Tertiary 664 Recycled Water
Total 46,313 -
Source: Bakersfield, 2021. 2020 UWMP
Every urban water supplier is required to assess the reliability to provide water service to its customers under normal, dry, and multiple dry water years. As shown in Table 4.18-5, the City’s Domestic Water System will be able to meet demands with projected supplies under normal and drought conditions from 2025 to 2040. Table 4.18-5 shows that the water demand would increase from 52,430 afy in 2025 to 63,834 afy in 2030 under normal conditions and would increase from 42,662 afy to 46,642 afy for the fifth consecutive drought year. The water use projections have not been adjusted to account for future water savings from codes, standards, ordinances, or transportation and land use plans and are therefore very conservative.

The City can increase use of their groundwater wells during years of reduced Kern River supplies.

The City’s Kern River supplies replenish the groundwater basin to provide reliability of groundwater supplies for a five-year drought. In addition, water conservation efforts accomplished by implementing the Water Shortage Contingency Plan would reduce in reductions in water demands by 10 to 15 percent during drought conditions.

Table 4.18-5 – Normal, Single Dry, and Multiple Dry Year Supply and Demand for the Domestic Water System (afy)
2025 2030 2035 2040
Normal Year
Supply Totals 52,430 63,834 68,952 74,550
Demand Totals 52,430 63,834 68,952 74,550
Difference 0 0 0 0
Single Dry Year
Supply Totals 50,190 54,873 59,991 65,589
Demand Totals 50,190 54,873 59,991 65,589
Difference 0 0 0 0
Multiple Dry Year
Year 1
Supply Totals 50,190 54,873 59,991 65,589
Demand Totals 50,190 54,873 59,991 65,589
Difference 0 0 0 0
Year 2
Supply Totals I I I I 45,171 49,386 53,992 59,030
Riverview Marketplace Commercial Project
Environmental Impact Report 4.18 Utilities and Services Systems City of Bakersfield – SCH No. 2025101507 4.18-13
Table 4.18-5 – Normal, Single Dry, and Multiple Dry Year Supply and Demand for the Domestic Water System (afy)
2025 2030 2035 2040
Demand Totals 45,171 49,386 53,992 59,030
Difference 0 0 0 0
Year 3
Supply Totals 42,662 46,642 50,992 55,751
Demand Totals 42,662 46,642 50,992 55,751
Difference 0 0 0 0
Year 4
Supply Totals 42,662 46,642 50,992 55,751
Demand Totals 42,662 46,642 50,992 55,751
Difference 0 0 0 0
Year 5
Supply Totals 42,662 46,642 50,992 55,751
Demand Totals 42,662 46,642 50,992 55,751
Difference 0 0 0 0
Source: Bakersfield, 2021. 2020 UWMP
The water demand for the Project is estimated to be 166.8 afy. This demand amounts to less than one percent of the City’s total water demand for normal year conditions for the year 2030. Project buildout is anticipated to occur in 2027.

The UWMP projects an increase in water demand of 9,224 afy from 2020 to 2030. More specifically, the water demand for the commercial land use sector would increase 1,876 afy from 2020 to 2030. The estimated Project water demand of 166.8 afy is only 8.9 percent of the increase in demand for the commercial land use sector and thus is accounted for in the UWMP as part of the future development in the City.

In addition, the City’s Water Shortage Contingency Plan would be implemented during drought conditions to further reduce water demand. Also, the water use projections do not account for future reductions in water demand with the implementation of water conservation programs, rebates for low-flow toilet and washer replacements, and the requirement to replace inefficient plumbing fixtures with the sale of residential and commercial properties. Also, this analysis did not consider the increased use of recycled water by the year 2030 that could be available to the proposed project or other future development within the City, which would further reduce the potable water demand.

Furthermore, the Kern River Conjunctive Use Optimization project would be implemented over time and involves the full use of the Citty’ available Kern River entitlement. Additional Kern River supplies may become available to the City through an Application to Appropriate Water filed with the SWRCB to obtain rights to the surplus, unappropriated, and available water in the Kern River.

Therefore, the Domestic Water System can accommodate the Project’s demand of 166.8 afy. A Water Shortage Contingency Plan (WSCP) was adopted as a part of the City’s 2020 UWMP to provide measures, referred to as response actions, to be implemented in the event of water shortages. In accordance with Water Code requirements, there are six standard water shortage levels and response actions defined in the City’s WSCP that increase restrictions on water use in response to increasing levels of water shortage conditions ranging from 10 percent to greater than 50 percent. The response actions and other considerations in the City’s WSCP are reviewed Riverview Marketplace Commercial Project
Environmental Impact Report 4.18 Utilities and Services Systems City of Bakersfield – SCH No. 2025101507 4.18-14
on a periodic basis to determine the effectiveness of the implementation of the various measures to achieve the desired water demand reductions.

Demand Management Measures
The City implements demand management measures (DMMs) designed to reduce water demands in the face of future droughts, improve water service reliability, and help meet state and regional water conservation goals. The City DMMs include the following:
• Water waste prevention ordinances for the Domestic Water System • Metering
• Conservation pricing for the Domestic Water System
• Public education and outreach
• Programs to assess and manage distribution system losses • Water conservation program coordination and staffing support • Using recycled water for irrigation of the Bakersfield Sports Village • Installing “smart” irrigation controllers in all City parks • Closing City spray parks during drought conditions
• Reducing the time and frequency of irrigation for City parks and landscape areas during drought conditions
• Installing artificial turf at various City facilities and within street medians throughout the City
• Prohibiting natural lawn within newly constructed City medians • Reducing the frequency that City vehicles are washed. • Replaced bathroom fixtures with water efficient fixtures at the Mechanics Bank Arena, Theater, and Convention Center, and the San Joaquin Community Ice Center of Bakersfield
• Reducing the frequency and duration of fire apparatus testing operations • Updating landscape standards to reflect the current State Model Water Efficient Landscape Ordinance
• Adopting, by reference, the California Green Code sections relating to installation of low water use plumbing fixtures in new construction
• Asset management for the Wholesale Water System
• Wholesale supplier assistance program
Therefore, the City will have sufficient water supplies available through the year 2040 to meet all future water demands, including those of the Project. In the event of a water shortage, implementation of the City’s Water Shortage Contingency Plan and demand management measures would ensure that sufficient water supplies are available to serve its customers. The Riverview Marketplace Commercial Project
Environmental Impact Report 4.18 Utilities and Services Systems City of Bakersfield – SCH No. 2025101507 4.18-15
City also has additional water supplies available with implementation of the Kern River Conjunctive Use Optimization Project and an expansion of the recycled water system.

Therefore, impacts would be less than significant.

Mitigation Measures
None required.

Level of Significance After Mitigation
Less than significant with no mitigation required.

Threshold UTI-3: Would the project result in a determination by the wastewater treatment provider which serves or may serve the project that is has adequate capacity to serve the project’s projected demand in addition to the provider’s existing commitments?
Impact Analysis
Wastewater generated by the Project would be collected and conveyed via the City of Bakersfield’s municipal sewer system, operated by the City’s Wastewater Division. The Project would be served by Wastewater Treatment Plant No. 3 which has a capacity of 25 million gallons per day (mgd), with a current average daily flow of 13.7 mgd.

As noted in the Sewer Area Study prepared for the Project, the average daily wastewater generated by the Project would be 0.2588 cubic feet per second (cfs) or 167,240 gallons per day.

The Project’s wastewater generation would be well within the available capacity of the Wastewater Treatment Plant No. 3.

Therefore, the Wastewater Treatment Plant No. 3. would have adequate capacity to treat the wastewater produced by Project operations. Furthermore, the Project would not require or result in the relocation or construction of new or expanded treatment facilities. Impacts related to wastewater generation would be less than significant.

Mitigation Measures
None required.

Level of Significance After Mitigation
Less than significant with no mitigation required.

Threshold UTI-4: Would the project generate solid waste in excess of State and local standards, or in excess of the capacity of local infrastructure or otherwise impair the attainment of solid waste reduction goals? Threshold UTI-5: Would the project comply with federal, state, and local management and reduction statutes and regulations related to solid waste? Impact Analysis
The Project site is currently vacant and therefore, no solid waste is currently being generated at the site. Once development occurs on the Project Site, an increase in waste stream to landfills would occur. The City of Bakersfield Public Works Department Solid Waste Division would provide solid waste disposal services to the Project Site.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.18 Utilities and Services Systems City of Bakersfield – SCH No. 2025101507 4.18-16
Construction associated with the Project would result in solid waste associated primarily with grading activities. There would be limited construction demolition debris. CALGreen requires builders/owners to divert 65 percent of construction waste from landfills (by recycling, reusing, and other waste reduction strategies), consistent with the State’s solid waste reduction goals. The Project also would be subject to compliance with applicable construction-related provisions of Chapter 8.32, Refuse, Solid Waste, and Recycling, of the City’s Municipal Code. As such, the Project would not generate solid waste in excess of State or local standards or otherwise impair the attainment of solid waste reduction goals, and impacts would be less than significant.

The Project would be served by the Metropolitan Sanitary Landfill, operated by the Kern County Public Works Department. This Class III municipal solid waste facility has a permitted maximum throughput of 4,500 tons per day and an estimated remaining capacity of approximately 22 million tons, equating to approximately 21 years of operation at current disposal rates.6 Regarding the Project’s operation, using CalRecycle’s solid waste generation factor for commercial uses of approximately 13 pounds per 1,000 square foot per day, the Project’s 405,531 square feet of building area would generate approximately 5,272 pounds/day (2.6 tons/day), or 949 tons per year of solid waste. Consistent with state mandates (AB 939, AB 341, AB 1826, and SB 1383) and City programs, at least 50 percent of this material would be diverted through recycling and organics collection, resulting in an estimated disposal volume of 474 tons per year (1.3 tons/day).

This generation represents approximately 0.03 percent of the landfill’s permitted daily throughput and an even smaller fraction of its remaining capacity. Given the minimal contribution of both operational and construction solid waste relative to available landfill capacity, the fact that the waste stream is accounted for in the County Integrated Waste Management Plan, and the Project’s compliance with all applicable waste reduction and diversion requirements, the Project would not generate solid waste in excess of state or local standards, exceed the capacity of local infrastructure, or impair the attainment of solid waste reduction goals. Therefore, impacts would be less than significant, and no further analysis is warranted.

Solid waste collection and disposal for the Project would be provided by the Bakersfield Department of Public Works (BDPW), which offers garbage, recycling, and organics collection services to residents and businesses. Solid waste from the Project would be transported to the Metropolitan Landfill, which operates under permits issued by CalRecycle. The Project would be required to comply with all applicable federal, state, and local solid waste management and reduction statutes and regulations, including the federal Resource Conservation and Recovery Act (RCRA), California Integrated Waste Management Act of 1989 (AB 939), Mandatory Commercial Recycling (AB 341), Mandatory Commercial Organics Recycling (AB 1826), and Short-Lived Climate Pollutants: Organic Waste Reductions (SB 1383), as well as the City of Bakersfield’s solid waste and recycling ordinances.

Compliance would be achieved through participation in the City’s collection and recycling programs, proper segregation of recyclables and organics, and adherence to landfill disposal requirements. Because the Project would be served by an established municipal solid waste collection system and would comply with all applicable statutes and regulations, it would not conflict with or obstruct implementation of solid waste management and reduction laws. 6 CalRecycle. https://www2.calrecycle.ca.gov/SolidWaste/Site/Summary/742 Riverview Marketplace Commercial Project
Environmental Impact Report 4.18 Utilities and Services Systems City of Bakersfield – SCH No. 2025101507 4.18-17
The Project would not generate solid waste in excess of State and local standards, or in excess of the capacity of local infrastructure, and would comply with CALGreen, State regulations, and City regulations regarding solid waste management. Accordingly, any impacts would be less than significant.

Mitigation Measures
None required.

Level of Significance After Mitigation
Less than significant with no mitigation required.

Cumulative Impacts
Implementation of the Project could potentially result in cumulative impacts associated with utilities and service systems when combined with other past, present, and reasonably foreseeable future projects in the broader project area.

All projects in the area would be subject to state and local water quality regulations, whose robustness is sufficient to ensure that the combined water quality solid waste and wastewater effects of each project would not be cumulatively considerable. With respect to construction operations, all cumulative projects would comply with the State’s NPDES Construction General Permit, requiring implementation of a stormwater pollution prevention plan during construction activities. Similar to the Project, each of the cumulative projects would be evaluated for demand on utilities and service systems. The cumulative projects would be required to comply with the applicable regulatory requirements and applicable mitigation to reduce potential impacts to these resources. Accordingly, cumulative impacts to utilities and service systems are less than significant.

Mitigation Measures
No mitigation measures are required as impacts would be less than significant.

Level of Significance After Mitigation
Not applicable. Project-specific and cumulative impacts related to utilities and service systems would be less than significant.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.18 Utilities and Services Systems City of Bakersfield – SCH No. 2025101507 4.18-18
This page intentionally left blank.

City of Bakersfield – SCH No. 2025101507 4.19-1

4.19 Wildfire
This section discusses potential environmental impacts associated with wildfire hazards that may result from implementation of the proposed Riverview Marketplace Commercial Project (Project).

Potential effects are evaluated based on whether the Project is in or near a State Responsibility Area (SRA) or lands classified as Very High Fire Hazard Severity Zones (VFHSZs) and, if so, whether the Project would substantially impair an adopted emergency response plan or emergency evacuation plan; exacerbate wildfire risks, and thereby expose Project occupants to pollutant concentrations from a wildfire or the uncontrolled spread of wildfire; require the installation or maintenance of associated infrastructure (such as roads, fuel breaks, emergency water sources, power lines, or other utilities) that may exacerbate fire risk or that may result in temporary or ongoing impacts to the environment; or expose people or structures to significant risks, including downslope or downstream flooding or landslides, as a result of runoff, post-fire slope instability, or drainage changes.

The analysis is based on a review of relevant regulatory setting, existing conditions, and a discussion of the thresholds used to determine whether the Project would result in significant impacts related to wildfire hazards and identified measures to reduce or avoid significant impacts if applicable. Information in this section is based, in part, on the Metropolitan Bakersfield General Plan (General Plan); the City of Bakersfield (City) Municipal Code (BMC) Title 17 (Zoning Ordinance); and the California Department of Forestry and Fire Protection (CAL FIRE) Fire Hazard Severity Zone web viewer.

During the scoping period for the Project’s Environmental Impact Report (EIR), no comments were received in response to the Notice of Preparation (NOP) regarding wildfire.

4.19.1 Regulatory Setting
Federal
Disaster Mitigation Act of 2000
The Disaster Mitigation Act (42 United States Code [U.S.C.] Section 5121) was signed into law to amend the Robert T. Stafford Disaster Relief Act of 1988 (42 U.S.C. Sections 5121-5207). Among other things, this legislation reinforces the importance of pre-disaster infrastructure mitigation planning to reduce disaster losses nationwide and is aimed primarily at the control and streamlining of the administration of federal disaster relief and programs to promote mitigation activities. Some of the major provisions of this Act include:
i. Funding pre-disaster mitigation activities;
ii. Developing experimental multi-hazard maps to better understand risk; iii. Establishing state and local government infrastructure mitigation planning requirements; iv. Defining how states can assume more responsibility in managing the hazard mitigation grant program; and
v. Adjusting ways in which management costs for projects are funded.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.19 Wildfire
City of Bakersfield – SCH No. 2025101507 4.19-2
State
California Department of Forestry and Fire Protection
CAL FIRE protects the people of California from fires, responds to emergencies, and protects and enhances forest, range, and watershed values providing social, economic, and environmental benefits to rural and urban citizens. Another major responsibility of CAL FIRE is to use its firefighters, fire engines, and aircraft to respond to wildland fires.

The Office of the State Fire Marshal supports CAL FIRE’s mission by focusing on fire prevention.

It provides support through a wide variety of fire safety responsibilities including by regulating buildings in which people live, congregate, or are confined; by controlling substances and products which may, in and of themselves, or by their misuse, cause injuries, death, and destruction by fire; providing statewide direction for fire prevention in wildland areas; regulating hazardous liquid pipelines; reviewing regulations and building standards; and providing training and education in fire protection methods and responsibilities.

State Fire Regulations
Fire regulations for California are established in Section 13000 et seq. of the California Health and Safety Code (HSC) and include regulations for structural standards (similar to those identified in the CBC; fire protection and public notification systems; fire protection devices such as extinguishers and smoke alarms; standards for high-rise structures and childcare facilities; and fire suppression training. The State Fire Marshal is responsible for enforcement of these established regulations and building standards for all state-owned buildings, state-occupied buildings, and state institutions within California.

California Public Resources Code Sections 4290 and 4291 California Public Resources Code (PRC) Sections 4290 and 4291, which implement minimum fire safety standards related to defensible space, apply to the perimeters and access to all commercial, industrial, and residential building construction within an SRA, and within lands classified and designated as VHFHSZ. The person(s) who control, lease, maintain, operate, or own such a building in, upon, or adjoining a mountainous area, forest-covered lands, brush-covered lands, grass-covered lands, or land that is covered with flammable materials is required to preserve a minimum defensible space of 100 feet from the perimeter of the building. The regulations include the following:
• Road standards for fire equipment access.
• Standards for signs identifying streets, roads, and buildings. • Minimum private water supply reserves for emergency fire use. • Fuel breaks and greenbelts.

These regulations do not supersede local regulations which equal or exceed minimum regulations adopted by the state.

California Government Code Section 66474.02
This regulation states that before a legislative body can approve a tentative map (or a parcel map for which a tentative map was not required) for an area or development located in an SRA or a VHFHSZ, the following findings must be made:

Riverview Marketplace Commercial Project
Environmental Impact Report 4.19 Wildfire
City of Bakersfield – SCH No. 2025101507 4.19-3

1. A finding supported by substantial evidence in the record that the subdivision is consistent with Sections 4290 and 4291 of the PRC, requiring 100 feet of defensible space around the structure.

2. A finding supported by substantial evidence in the record that the subdivision is consistent with local ordinances certified by the State Board of Forestry and Fire Protection as meeting or exceeding the state regulations.

3. A finding supported by substantial evidence in the record that structural fire protection and suppression services will be available for the subdivision through any of the following entities:
a. A county, city, special district, political subdivision of the state, or another entity organized solely to provide fire protection services that is monitored and funded by a county or other public entity.
b. CAL FIRE by contract entered into pursuant to Sections 4133, 4142, or 4144 of the PRC.

Upon approving a tentative map, or a parcel map for which a tentative map was not required, for an area (development) located in an SRA or VHFHSZ, a legislative body shall transmit a copy of the findings and accompanying maps to the State Board of Forestry and Fire Protection. 2025 California Fire Code
2025 California Fire Code, CCR Title 24, Part 9 (2025 California Fire Code) is a set of regulations addressing fire safety and fire prevention in buildings and structures throughout the State.1It contains regulations relating to construction and maintenance of buildings, the use of premises, and the management of Wildland-Urban Interfaces (WUI) areas, among other issues. The California Fire Code is updated every three years by the California Building Standards Commission and was last updated in 2025 and effective January 1, 2026. The California Fire Code 2025 is based on the International Fire Code 2024 (IFC 2024) with amendments and additions.

The Fire Code sets forth regulations regarding building standards, fire protection and notification systems, fire protection devices such as fire extinguishers and smoke alarms, high-rise building standards, and fire suppression training. It contains regulations relating to construction, maintenance, and use of buildings. Topics addressed in the code also include fire department access, fire hydrants, automatic sprinkler systems, fire alarm systems, fire and explosion hazards safety, hazardous materials storage and use, provisions intended to protect and assist fire responders, industrial processes, and many other general and specialized fire-safety requirements for new and existing buildings and the surrounding premises. Development under the Project would be subject to applicable regulations of the California Fire Code.

Title 8 California Code of Regulations Sections 1270 and 6773 In accordance with CCR, Title 8, Section 1270, “Fire Prevention,” and Section 6773, “Fire Protection and Fire Equipment,” the California Occupational Safety and Health Administration (Cal/OSHA) has established minimum standards for fire suppression and emergency medical services. The standards include, but are not limited to, guidelines on the handling of highly combustible materials, fire hose sizing requirements, restrictions on the use of compressed air, 1 California Fire Code. 2025. Available at: https://up.codes/viewer/california/ca-fire-code-2025. Accessed March 2026.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.19 Wildfire
City of Bakersfield – SCH No. 2025101507 4.19-4
access roads, and the testing, maintenance, and use of all firefighting and emergency medical equipment.
2025 California Building Code
California building standards are published in the CCR, Title 24, also known as the California Building Code (CBC). The CBC, which applies to all applications for building permits, consists of 12 parts that contain administrative regulations for the California Building Standards Commission and for all state agencies that implement or enforce building standards. Local agencies must ensure the development complies with the regulations contained in the CBC.

California Governor’s Office of Emergency Management Agency In 2009, the State of California passed legislation creating the California Governor’s Office of Emergency Management Agency (Cal-EMA) and authorizing it to prepare a Standardized Emergency Management System (SEMS) program (19 CCR Section 2400 et seq.), which sets forth measures by which a jurisdiction should manage emergency disasters. Non-compliance with SEMS could result in the state withholding disaster relief from the non-complying jurisdiction in the event of an emergency disaster. Cal-EMA, Fire and Rescue Division is responsible for the development, implementation and coordination of the California Fire Service and Rescue Emergency Mutual Aid Plan (the Plan). The Plan is developed and updated under guidance and approval of the Fire and Rescue Service Advisory Committee/FIRESCOPE Board of Directors.

The continued success of California’s unique and highly-effective Fire and Rescue Mutual Aid System demands a maximum level of understanding and cooperation by all who use and support it.

California Mutual Aid System
The Plan is an extension of, and supportive document to, the California Emergency Plan. The Plan was first prepared and adopted in 1950 as Annex 3-C of the California State Civil Defense and Disaster Relief Plan.2 The purpose of the Plan is:
• To provide for systematic mobilization, organization, and operation of necessary fire and rescue resources of the state and its political subdivisions in mitigating the effects of disasters, whether natural or man-caused.
• To provide comprehensive and compatible plans for the expedient mobilization and response of available fire and rescue resources on a local, area, regional, and statewide basis.
• To establish guidelines for recruiting and training auxiliary personnel to augment regularly organized fire and rescue personnel during disaster operations. • To provide an annually updated fire and rescue inventory of all personnel, apparatus, and equipment in California.
• To provide a plan and communication facilities for the interchange and dissemination of fire and rescue-related data, directives, and information between fire and rescue officials of local, state, and federal agencies.
2 California Governor’s Office of Emergency Services. 2026. Fire Operations webpage. Available at:
https://www.caloes.ca.gov/office-of-the-director/operations/response-operations/fire-rescue/fire-operations/. Accessed March 2026.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.19 Wildfire
City of Bakersfield – SCH No. 2025101507 4.19-5
• To promote annual training and/or exercises between plan participants.

Senate Bill 1241: Fire Hazard Impacts
Senate Bill (SB) 1241 was passed in September 2013, which required the Governor’s Office of Planning and Research (now called the Office of Land Use and Climate Innovation [LCI]), the Natural Resource Agency, and CAL FIRE to develop “amendments to the initial study checklist of the [CEQA Guidelines] for the inclusion of questions related to fire hazard impacts for projects located on lands classified as SRAs, as defined in Section 4102, and on lands classified as VHFHSZ, as defined in Subdivision (i) of Section 51177 of the Government Code.” (PRC Section 21083.01). With California's increasing population and the expansion of development into previously undeveloped areas, there are more "wildland‐urban interface" issues with a corresponding increased risk of loss to human life, natural resources, and economic assets associated with wildland fires. Additionally, the changing climate, specifically rising temperatures and increasing temporal variability of water availability has substantially increased wildfire risk in many areas around the State.

California Code of Regulations Sections 51175 through 51189 This portion of the CCR establishes the Moderate, High, and Very High Fire Severity Zones within the State. This regulation allows emergency response and hazard management departments to effectively locate areas which are more susceptible to fire hazards. This law also provides the framework for further preventive measures to decrease wildfire hazards.

Local
Metropolitan Bakersfield General Plan
The General Plan, dated December 2002, was updated in January 2016 per Resolution No. 018- 16 and 019-16. At the time this EIR was published for public review, the City was in the process of updating its Bakersfield 2045 General Plan, but it had not yet been adopted. The General Plan includes goals, policies, and directions to achieve the City’s vision of the community and future development. The General Plan includes 12 elements that focus on: Land Use; Circulation; Housing; Conservation; Noise; Safety; Downtown Redevelopment; Public Services Facilities; Open Space; Parks; Kern River Plan; and Historical Resources.

The General Plan established the following goals and policies, and implementation programs in order to protect the City’s residents and visitors from wildfire hazards.

Land Use Element
LAND/GEN-G-6 Accommodate new development that is sensitive to the natural environment, and accounts for environmental hazards.

Safety Element
SAFE/GEN-G-1 To develop sustainable communities to preserve life, protect property, the environment, and the economy from natural hazards.

SAFE/GEN-P-1 The adopted Kern County, California Multi-Hazard Mitigation Plan is incorporated by reference. This multi-jurisdictional plan, approved in compliance with the Disaster Mitigation Act of 2000, provides long-term planning to reduce the impacts of future disasters.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.19 Wildfire
City of Bakersfield – SCH No. 2025101507 4.19-6
Implementation Measures
1 The adopted multi-jurisdictional Kern County, California Multi-Hazard Mitigation Plan, as approved by FEMA, shall be used as a source document for preparation of environmental documents pursuant to CEQA, evaluation of project proposals, formulation of potential mitigation and identification of specific actions that could, if implemented, mitigate impacts from future disasters and other threats to public safety.

Kern County Multi-Jurisdictional Hazard Mitigation Plan The Kern Multi-Jurisdictional Hazard Mitigation Plan (MJHMP) was approved by the Federal Emergency Management Agency (FEMA) on April 9, 2021. The Kern MJHMP provides an explanation of prevalent hazards within the County and how hazards may affect the County and participating cities and special districts differently based upon proximities to natural hazards. It also identifies risks to vulnerable assets, both people and property. The mitigation strategy presented in the Kern MJHMP responds to the identified vulnerabilities within each community and provides prescriptions or actions to achieve the greatest risk reduction based upon available resources. The County and participating jurisdictions intend to save lives, reduce injuries, reduce property damage, and protect natural resources for future generations through mitigation activities.3 The City has its own participating jurisdiction annex report that contained individually assessed hazards, explored hazard vulnerability, developed mitigation strategies, and followed the same planning process as County to create the annexes.

Kern County Emergency Operations Plan
The Kern County Emergency Operations Plan (EOP) is an all-hazards document that provides for the integration and coordination of planning efforts of the County with those of its cities, special districts, and the state region. It provides a framework for the County to use in performing emergency functions before, during, and after an emergency event, natural disaster, or technological incident. As the lead agency for the Operational Area (OA), the County will lead the coordination among the cities and special district within the jurisdiction. This EOP provides for the County’s compliance with the SEMS, the National Incident Management System (NIMS), the Incident Command System (ICS), the National Response Framework (NRF), and the National Preparedness Guidelines to include Comprehensive Preparedness Guide 101, version 2.0:

Developing and Maintaining Emergency Operations Plans (CPG-101). It facilitates multi-agency and multijurisdictional coordination during emergency operations, public information functions, and resource management. This EOP serves as the legal and conceptual framework for incident management to be utilized by the County and its various departments. 4 City of Bakersfield Municipal Code
The City of Bakersfield Municipal Code adopts the 2025 CBC in Section 15.05.010. The City’s Building Division is responsible for promoting health and safety in the construction and maintenance of buildings and structures, and the maintenance of property through the enforcement of uniform building construction codes, conservation standards, regulations, and ordinances, including the CBC and the City’s adopted policies, ordinances, and standards. 3 County of Kern. 2021. Kern Multi-Jurisdictional 2020 MJHMP Update. Available at:
https://psbweb.kerncounty.com/planning/pdfs/MJHMP/Volumes/Volume1.pdf. Accessed March 2026. 4 Kern County Office of Emergency Services. 2022. County of Kern Emergency Operations Plan. Available at:
https://www.kerncounty.com/home/showpublisheddocument/8407/637859766134270000. Accessed March 2026.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.19 Wildfire
City of Bakersfield – SCH No. 2025101507 4.19-7

4.19.2 Environmental Setting
According to the National Park Service, wildland fire is described as an overarching term describing any non-structure fire that occurs in vegetation and natural fuels. A wildfire is an unplanned fire caused by lightning or other natural causes, by accidental (or arson-caused) human ignitions, or by an escaped prescribed fire.
5 PRC Sections 4201-4204 direct CAL FIRE to map fire hazards within a SRA based on fuel loading, slope, fire weather, and other relevant factors present, including areas where winds have been identified by the department as a major cause of wildfire spread. These zones, referred to as Fire Hazard Severity Zones (FHSZ), classify a wildland zone as Moderate, High, or Very High fire hazard based on the average hazard across the area included in the zone. As part of this mapping system, land where CAL FIRE is responsible for wildland fire protection and generally located in unincorporated areas is classified as SRAs. Where local fire protection agencies, such as the BFD, are responsible for wildfire protection, the land is classified as a Local Responsibility Area (LRA). As further discussed in Section 4.15, Public Services and Recreation, of this Draft EIR, BFD has a joint powers agreement (JPA) with Kern County Fire Department (KCFD) in which the agency with the closest fire station will respond to the call for service regardless of the jurisdiction.6 The closest station to the Project Site is KCFD Station 65, Greenacres Station, located at 10051 Meacham Road, approximately 0.93 miles northwest of the Project Site. KCFD Station 66, Landco Station, is also in close proximity to the Project Site, located at 3000 Landco Drive, approximately 1.93 miles east of the Project Site.7 As such, calls for service from the Project site would be addressed by KCFD.

According to CAL FIRE’s FHSZ viewer, the entire Project Site and surrounding area is designated as a LRA. The Project Site is identified as having no FHSZ and it is not within or near to a VHFHSZ. The closest FHSZ, both moderate and high, is located in an LRA and is approximately

4.29 miles northeast of the Project Site, as the uplands around the Kern River transition to Sequioa National Forest. The nearest VHFHSZ in an SRA is located 16.17 miles east of the Project Site.

4.19.3 Impact Analysis
Methodology
Evaluation of potential impacts associated with wildfire was based on a review of CAL FIRE maps to determine the location of the Project relative to FHSZ.

Thresholds of Significance
The City utilizes the California Environmental Quality Act (CEQA) Guidelines, Appendix G, and thresholds of significance8to analyze the environmental impacts of the Project. Per CEQA Guidelines, an impact is considered significant if the Project would:
• Substantially impair an adopted emergency response plan or emergency evacuation plan. 5 National Park Service. 2026. Wildfires, Prescribed Fires, and Fuels webpage. Available at:
https://www.nps.gov/orgs/1965/wildfires-prescribed-fires-fuels.htm. Accessed March 2026. 6 Kern Local Agency Formation Commission. 2026. Committee on City Annexations FAQs. Available at:
https://www.kernlafco.org/committee-on-city-annexations-faqs. Accessed February 2026. 7 City of Bakersfield. 2026. Departments, Fire. Locate Fire Stations GIS portal. Available at: Accessed February 2026. 8 Association of Environmental Professionals (AEP). 2025. CEQA Guidelines Appendices, Appendix G: Environmental Checklist Form. Available at: https://www.califaep.org/docs/CEQA_Handbook_2025combined.pdf. Accessed January 2026.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.19 Wildfire
City of Bakersfield – SCH No. 2025101507 4.19-8
• Due to slope, prevailing winds, and other factors, exacerbate wildfire risks, and thereby expose project occupants to pollutant concentrations from a wildfire or the uncontrolled spread of a wildfire.
• Require the installation or maintenance of associated infrastructure (such as roads, fuel breaks, emergency water sources, power lines or other utilities) that may exacerbate fire risk or that may result in temporary or ongoing impacts to the environment. • Expose people or structures to significant risks, including downslope or downstream flooding or landslides, as a result of runoff, post-fire slope instability, or drainage changes.

Project Impacts
Threshold WF-1: Would the project substantially impair an adopted emergency response plan or emergency evacuation plan?
Impact Analysis
According to the CAL FIRE, the Project Site is not within or in proximity to a VHFHSZ, nor is it within a SRA. The Project Site is located within an LRA and currently receives fire protection services through a JPA with BFD and KCFD. Calls for service from the Project Site would be addressed by KCFD. According to the Kern MJHMP, the Project Site is not identified as being located where there is historic fire occurrence where wildfires have occurred or returned at any interval. The Kern MJHMP also classifies the Project Site as having no wildfire vulnerability, and as such, it also does not have an exposure risk.9
No aspect of the Project would prevent the implementation of the Kern MJHMP and EOP.

Construction of the proposed Project would be generally confined to the Project Site and would not physically impair access to the Project Site or the surrounding area. During both construction and long-term operation, the Project would be required to maintain adequate emergency access for emergency vehicles as required by the City, BFD, and KCFD. Furthermore, compliance with the fire code and local ordinances would ensure that the Project would not impair an adopted emergency response plan or emergency evacuation plan. Therefore, there would be no impact.

Mitigation Measure
None required.

Level of Significance After Mitigation
No impact with no mitigation required.

Threshold WF-2: Would the project, due to slope, prevailing winds, and other factors, exacerbate wildfire risks, and thereby expose project occupants to pollutant concentrations from a wildfire or the uncontrolled spread of a wildfire?
Impact Analysis
The Project Site is not located in or near an SRA, and the Project Site does not contain lands classified as VHFHSZs. According to the Kern MJHMP, the Project Site is not identified as being located where there is historic fire occurrence where wildfires have occurred or returned at any 9 County of Kern. 2021. Kern Multi-Jurisdictional 2020 MJHMP Plan. Participating Jurisdiction Annex: City of Bakersfield. Available at: https://psbweb.kerncounty.com/planning/pdfs/MJHMP/Municipalities/MUNICIPALITY_Bakersfield.pdf. Accessed March 2026.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.19 Wildfire
City of Bakersfield – SCH No. 2025101507 4.19-9
interval. The Kern MJHMP also classifies the Project Site as having no wildfire vulnerability, and as such, it also does not have an exposure risk.10 Additionally, the Project would be required to comply with the CBC and California Fire Code. As such, the Project would not exacerbate wildfire risks or expose Project occupants to pollutant concentrations or the uncontrolled spread of a wildfire. Therefore, no impact would occur.

Mitigation Measure
None required.

Level of Significance After Mitigation
No impact with no mitigation required.

Threshold WF-3: Would the project require the installation or maintenance of associated infrastructure (such as roads, fuel breaks, emergency water sources, power lines or other utilities) that may exacerbate fire risk or that may result in temporary or ongoing impacts to the environment?
Impact Analysis
The Project site is not located in or near an SRA and does not contain lands classified as VHFHSZs. During both construction and long-term operation, the Project would be required to maintain adequate emergency access for emergency vehicles as required by the BFD and KCFD.

Because the Project is required to comply with all applicable City codes, including the CBC and California Fire Code which has been incorporated into the City’s Municipal Codes, and is not located in a VHFHSZ, construction and operation of the Project would not increase the risk of fire, nor would it require the installation/maintenance of infrastructure that would exacerbate fire risk.

Therefore, no impact would occur.

Mitigation Measure
None required.

Level of Significance After Mitigation
No impact with no mitigation required.

Threshold WF-4: Would the project expose people or structures to significant risks, including downslope or downstream flooding or landslides, as a result of runoff, post-fire slope instability, or drainage changes? Impact Analysis
The Project site is not located in or near an SRA and does not contain lands classified as VHFHSZs. The Project Site is located on relatively flat ground and is not adjacent to any areas with steep slopes that could produce a landslide. It also is not located downstream of any bodies of water that would result in flooding to the Project Site. As such, the Project would not expose people or structures to significant risks as a result of runoff, post-fire slope instability, or drainage changes. Potential impacts regarding flooding, landslides, and drainage are further discussed in 10 County of Kern. 2021. Kern Multi-Jurisdictional 2020 MJHMP Plan. Participating Jurisdiction Annex: City of Bakersfield. Available at: https://psbweb.kerncounty.com/planning/pdfs/MJHMP/Municipalities/MUNICIPALITY_Bakersfield.pdf. Accessed March 2026.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.19 Wildfire
City of Bakersfield – SCH No. 2025101507 4.19-10
Section 4.7, Geology and Soils, and Section 4.10, Hydrology and Water Quality. Therefore, there would be no impact.

Mitigation Measure
None required.

Level of Significance After Mitigation
No impact with no mitigation required.

Cumulative Impacts
Impact Analysis
Section 3.3, Cumulative Development, identifies projects that are planned, under construction, or have been recently completed. A summary of these projects is provided in Table 3-1, Cumulative Projects List. Potential cumulative impacts would occur if the Project in combination with the identified cumulative projects would result in significant effects to wildfire. For purposes of this analysis, the geographic scope would be the City.

Under the Kern MJHMP, the majority of the City does not have a history of fire occurrence and as such, wildfires have not returned at any interval. The Kern MJHMP also classifies the majority of the City as having no wildfire vulnerability, and as such, it also does not have an exposure risk.

The nearest FHSZ is located 4.29 miles to the northeast and the closest VHFHSZ is over 16 miles east. Therefore, neither the Project nor the cumulative projects, which are within a 1.5 miles radius, are located within areas susceptible to wildfire, including FHSZ. Subsequently, there would be no impacts, including cumulative impacts, associated with wildfire.

Mitigation Measures
None required.

Level of Significance After Mitigation
There would be no cumulative impacts associated with wildfire with no mitigation required.

City of Bakersfield – SCH No. 2025101507 5-1

5. Alternatives

5.1 Introduction
CEQA Guidelines Section 15126.6(a), requires that an EIR “describe a range of reasonable alternatives to the project, or to the location of the project, which would feasibly attain most of the basic objectives of the project but would avoid or substantially lessen any of the significant effects of the project, and evaluate the comparative merits of the alternatives.” This chapter presents the alternatives analysis required by CEQA for the proposed Project, summarizes the proposed Project, identifies the Project objectives, describes the alternatives to be analyzed, and discusses the alternatives considered but eliminated from further analysis. The impacts associated with each alternative are then described by environmental topic discussed in Chapter 4, Environmental Impact Analysis, and compared with those of the proposed Project. Based on this alternatives analysis, and as required by CEQA, this chapter concludes by identifying the environmentally superior alternative.

5.2 Project Summary
As described in Chapter 2, Project Description, of this Draft EIR, the Project Site is located on a portion of a larger property formerly occupied by the PG&E Kern Power Plant. The Project Site is currently secured on all sides by six-feet-tall chain-link fencing, with vehicular access provided via gated unpaved entry drives along Coffee Frontage Road and one concrete paved driveway along Rosedale Highway. Both Coffee Road and Rosedale Highway are improved with concrete curb and gutters, yet only Rosedale Highway is fully developed with a concrete sidewalk. A portion of Coffee Road is improved with a concrete sidewalk. Existing onsite features include abandoned oil wells; electrical transmission lines on metal poles, towers, and wooden poles; and several dirt roads and mounds.

The Project involves construction and operation of the Riverview Marketplace, a commercial retail center, that would encompass 405,531 square feet of total building space. The specific businesses and/or tenants that would ultimately occupy each of the buildings are not fully known at this time. However, it is assumed that larger interior anchor buildings within the Project Site would be occupied by markets, retail uses, storage uses, and a health club. The outer building pads would be occupied by smaller retail tenants, a medical office, drive-thrus, fast casual and sit-down restaurants, a car wash, and a gas station with 20 dual-sided pumps.

The Project would feature new landscaping along the entire site perimeter and internal to the Project Site. Landscaping would include a variety of ornamental trees, shrubs, and groundcover that would help soften the massing of the buildings, provide for a pedestrian oriented experience and provide shade. The Project would also include enhanced paving areas within small plaza areas, in front of storefronts and enhanced vehicular paving at entry points. The Project would include a detention basin on the northern portion of the Project Site that would be fenced and screening with landscaping. Near the detention basin would be a play area which would include landscaped mounds, benches, picnic tables, bike racks and a lawn area.

Loading and unloading of delivery trucks for the major retail buildings would occur in the designated loading dock of that building, which are toward the rear of the buildings. For the tenants of the outlying building pads, loading and unloading of delivery trucks would occur in designated areas (within proximity of the tenants) that would not impede the internal vehicular Riverview Marketplace Commercial Project
Environmental Impact Report 5.0 Alternatives
City of Bakersfield – SCH No. 2025101507 5-2
circulation system. No loading or unloading activities would occur in the parking areas or non-designated loading/unloading areas.

5.3 Project Objectives
Chapter 2, Project Description, describes the purpose of the Project and the Project’s underlying objectives.

The objectives of the Project are:
• A Project that allows for the revitalization of the Project Site, adapting to changing market conditions and providing economic benefits to the City. • An infill development that promotes the sustainable principles of smart growth. • A Project that encourages and facilitates new uses of high -quality architecture and design.
• A mixture of commercial uses that provides new activity and services to the area and is cohesive with established neighborhoods, businesses, and community amenities nearby.
• Creation of new and future employment opportunities.
• A circulation system responsive to the needs of vehicular, bicycle, and pedestrian travel. • New native and drought tolerant. landscaping that visually enhances the Project Site and surrounding perimeter
• A visually harmonious development as viewed both internally and externally.

5.4 Project Impacts
Based on the environmental analysis completed for the proposed Project and discussed in Chapter 4, Environmental Impact Analysis, significant and unavoidable impacts have been identified for the following environmental resource factor:
• Section 4.8, Greenhouse Gas Emissions
• Section 4.16, Transportation
Significant impacts requiring mitigation to reduce the impact to less than significant have been identified for the following environmental resource factors:
• Section 4.3, Air Quality
• Section 4.4, Biological Resources
• Section 4.5, Cultural Resources
• Section 4.7, Geology and Soils
Less than significant impacts were identified in the following environmental resource factors:
• Section 4.1, Aesthetics
• Section 4.6, Energy
Riverview Marketplace Commercial Project
Environmental Impact Report 5.0 Alternatives
City of Bakersfield – SCH No. 2025101507 5-3
• Section 4.9, Hazards
• Section 4.10, Hydrology and Water Quality
• Section 4.11, Land Use and Planning
• Section 4.13, Noise
• Section 4.14, Population and Housing
• Section 4.15, Public Services and Recreation
• Section 4.17, Tribal Cultural Resources
• Section 4.18, Utilities and Service Systems
No impacts were identified for the following environmental resource factors:
• Section 4.2, Agriculture and Forestry Resources
• Section 4.12, Mineral Resources
• Section 4.19, Wildfire

5.5 Summary of Project Alternatives
This section of the Draft EIR considers three alternatives to the Project. These alternatives include:
• Alternative 1: No Build/No Project
• Alternative 2: Reduced Project Alternative
• Alternative 3: Existing General Plan/Zoning Alternative Consistent with CEQA Guidelines Section 15126.6(c), Alternatives 2 through 3 represent a range of reasonable “build” alternatives that could feasibly accomplish the project objectives discussed in Section 5.3, Project Objectives, and could potentially lessen the environmental impacts of the proposed Project. Per CEQA Guidelines Section 15126.6(e), the alternatives analysis includes the required “No Build/No Project” alternative. The purpose of describing and analyzing the “No Build/No Project” alternative is to allow decisionmakers the ability to compare the impacts of approving the proposed Project with the impacts of not approving the proposed Project.

Each of the three alternatives is described in greater detail below. Each alternative is described and evaluated in sufficient detail to determine whether the overall environmental impacts would be less than, similar to, or greater than the corresponding impacts of the Project. Furthermore, each alternative is evaluated to determine whether the Project objectives could be substantially attained by the alternative. It should be noted that the alternatives analysis excludes those impact thresholds for which the Project results in no impact, as summarized in Table ES-1.

At the end of this section, the comparative impacts of the Project and the alternatives are summarized in Table 5-1: Comparison of the Impacts of the Project Alternatives, below.

Pursuant to CEQA Guidelines Section 15126.6(e)(2) an Environmentally Superior Alternative is identified.

Riverview Marketplace Commercial Project
Environmental Impact Report 5.0 Alternatives
City of Bakersfield – SCH No. 2025101507 5-4

5.5.1 Alternative 1: No Build/No Project
Description of the Alternative
Pursuant to Section 15126.6(e)(3)(B) of the CEQA Guidelines, Alternative 1, the “No Project” Alternative, represents the circumstance under which the Project does not proceed. Under Alternative 1 it is assumed that the existing state of the Project Site would remain as is and no new development would be implemented. As discussed in Chapter 2, Project Description, of this Draft EIR, the Project Site is located on a portion of a larger property formerly occupied by the PG&E Kern Power Plant. The Project Site is currently secured on all sides by six-feet tall chain-link fencing, with vehicular access provided via gated unpaved entry drives along Coffee Frontage Road and one concrete paved driveway along Rosedale Highway. Both Coffee Road and Rosedale Highway are improved with concrete curb and gutters, yet only Rosedale Highway is fully developed with a concrete sidewalk. Portion of Coffee Road is improved with concrete sidewalk. Existing onsite features include abandoned oil wells; electrical transmission lines on metal poles, towers, and wooden poles; and several dirt roads and mounds.

Aesthetics
Under the No Build/No Project Alternative, the proposed commercial retail center and associated uses such as markets, retail/restaurants, medical offices, health club, and associated parking and landscaping would not be developed. The Project Site would remain in its current condition as largely vacant and fenced with on-site features including abandoned oil wells; electrical transmission lines on metal poles, towers, and wooden poles; and several dirt roads and mounds.

Regarding scenic quality, aesthetic impacts would be greater, as the Project would not transform an underutilized site into an active infill commercial center that would provide a visual improvement to the Project Site compared to existing conditions.

The Project does not contain any special or unique scenic attributes, like rock outcroppings, native vegetation, or a substantial number of mature trees. The Project Site is not situated in one of the areas the City has recognized as featuring scenic vistas or along a scenic route as identified in the City’s General Plan. Accordingly, similar to the Project, the No Build/No Project Alternative would not block a view corridor of a scenic resource.

Regarding light and glare, no new sources of nighttime lighting or daytime glare would be introduced and no change to ambient lighting conditions in the surrounding area would occur. No impact related to light or glare would result.

Therefore, the No Build/No Project Alternative would result in no aesthetic impacts with response to light and glare, which is less than the Project’s less than significant impacts. However, impacts to scenic quality would be greater as the No Build/No Project Alternative would not visually improve the Project Site from existing conditions.

Agriculture and Forestry Resources
The Project Site is in an urbanized area of the City. Additionally, the Project Site is identified as vacant and disturbed land and therefore does not support agricultural resources or operations.

As discussed in Section 4.2, Agricultural and Forestry Resources, the Project would not result in the conversion of designated farmland to non-agricultural uses, or forest land to non-forestland.

Riverview Marketplace Commercial Project
Environmental Impact Report 5.0 Alternatives
City of Bakersfield – SCH No. 2025101507 5-5
Under Alternative 1, the Project Site would remain in its current condition and no impacts to agricultural resources would occur. Similar to the Project, no impact would occur. Impacts would be same under the No Build/No Project Alternative than the Project.

Air Quality
Under the No Build/No Project Alternative, the commercial development would not be constructed. No construction activities would occur, and no operational land uses that generate air emissions would be established on the Project Site. Accordingly, no construction equipment exhaust, fugitive dust, or vehicle trip emissions would be generated.

With respect to consistency with applicable air quality plans, the No Build/No Project Alternative would not generate any emissions that could conflict with or hinder implementation of the SJVAPCD’s adopted air quality attainment plans. No impact would occur.

With respect to criteria pollutant emissions and SJVAPCD regional and localized significance thresholds no construction or operational emissions would be generated. No potential exceedance of SJVAPCD thresholds would occur. With respect to objectionable odors, no land uses associated with odor generation would be established. No impact would occur. Therefore, the No Build/No Project Alternative would result in no air quality impacts, which is less than the Project’s less than significant impacts with mitigation measures that include MM AQ-1 (require the Project applicant to enter into a VERA with the SJVAPCD,); MM AQ-2 (provide onsite reductions in VOC emissions associated with coatings and paints used for the building exterior surfaces and parking lot striping; and implementation of MM GHG-1 through MM GHG-3 (provide VOC reductions generated from building energy use, property management landscaping equipment, and project-related vehicle trips). Impacts would be less under the No Build/No Project Alternative than the Project.

Biological Resources
Under the No Build/No Project Alternative, the commercial improvements would not be constructed. No ground-disturbing activities, vegetation removal, or construction operations would occur on the Project Site. The Project Site would remain in its current condition. As discussed in Section 4.4, Biological Resources, no special-status species under CEQA or designated critical habitat were found on the Project Site.

The Project Site does not contain suitable habitat for the Western burrowing owl (BUOW) and it was not present on the Project Site during the field survey conducted for the DEIR. However, because BUOWs may become established on disturbed sites prior to construction, under the Project, a pre-construction BUOW survey is recommended within 30 days prior to the start of ground-disturbing activities, as specified further in MM BIO-1. If BUOWs are detected, appropriate avoidance and minimization measures, including no disturbance buffers and monitoring, shall be implemented in consultation with CDFW as specified in MM BIO-2.

Additionally, the Project Site has shrubs that could be used by nesting songbirds during the nesting bird season. Therefore, the Project would implement MM BIO-3, which require pre-construction nesting surveys prior to initiation of Project, should ground disturbance, vegetation clearing, or other construction activities that would otherwise disturb nesting activity (for instance, mobilization of heavy equipment).

Riverview Marketplace Commercial Project
Environmental Impact Report 5.0 Alternatives
City of Bakersfield – SCH No. 2025101507 5-6
Therefore, biological resource impacts under the No Build/No Project Alternative would not occur, which is less than the Project’s impacts, which range from no impact to less than significant with mitigation (MM BIO-1 through MM BIO-3). Impacts would be less than the Project.

Cultural Resources
As discussed in Section 4.5, Cultural Resources, of this Draft EIR, the Cultural Resources Assessment prepared for the Project indicated there is a low probability that intact surface or subsurface archaeological resources or human remains would be discovered during construction.

However, as some development occurred before the implementation of regulations related to the identification of archaeological resources, it is also possible that archaeological resources were present on the Project Site and were not recorded before or during development.

Therefore, the Project would implement MM CUL-1, which would require that field personnel be alerted to the possibility of buried prehistoric or historic cultural deposits prior to initiation of ground-disturbing activities. MM CUL-1 would also provide a process for treatment of any archaeological resources inadvertently discovered during Project implementation. The Project would also implement MM CUL-2, requiring a cessation of construction activity until the County coroner can evaluate the discovery and made the necessary findings, would provide a process for treatment of any human remains inadvertently discovered during Project implementation. With implementation of MM CUL-1 and MM CUL-2, cultural resource impacts under the Project would be less significant with mitigation incorporated.

Alternative 1 would involve no construction nor operations that would result in site disturbance that could impact archaeological resources. As such, Alternative 1 would avoid the Project’s less than significant impact (after mitigation) related to the potential of any impacts to cultural resources and human remains. Thus, impacts would be less under Alternative 1 than the Project.

Energy
As discussed in Section 4.6, Energy, Project construction would consume energy due to fuel use by construction equipment as well as on-road vehicles used by construction employees, vendors, and for hauling materials. Operation would create additional demands for electricity and natural gas compared to existing conditions and would result in increased transportation energy use.

Operational energy use would include heating, cooling, and ventilation of buildings; water heating; operation of electrical systems, use of on-site equipment and appliances; and indoor, outdoor, perimeter, and parking lot lighting.

Overall, construction and operation of the Project would not result in the inefficient, wasteful, or unnecessary consumption of energy. The Project would not cause or result in the need for additional energy production or transmission facilities.

The No Build/No Project Alternative would involve no construction nor operations that would require new or increased energy use on the Project Site and would not generate an increase in demand for energy compared to existing conditions. As such, the No Build/No Project Alternative would avoid the Project’s less significant energy consumption impacts during construction and operation. Thus, impacts with regard to energy consumption would be less under Alternative 1 when compared to the Project.

Riverview Marketplace Commercial Project
Environmental Impact Report 5.0 Alternatives
City of Bakersfield – SCH No. 2025101507 5-7
Geology and Soils
As discussed in Section 4.7, Geology and Soils, of this Draft EIR, the Project Site is located within central California, which is a seismically active region, and potential for seismic ground shaking exists at the Project Site. However, the Project Site is not located within an active fault zone.

Furthermore, the Project would not exacerbate existing environmental conditions related to seismic ground shaking at the Project Site because the proposed Project would not involve mining operations, excavation of large areas, or the extraction or injection of oil or groundwater, which could create unstable seismic conditions that would exacerbate ground shaking. Additionally, mandatory compliance with applicable regulatory requirements and incorporation of the recommendations included in the Geotechnical Investigation would reduce the potential for significant damage to structures resulting from strong seismic ground shaking and the exposure of people or structures to potential substantial adverse effects to be less than significant.

According to the Geotechnical Investigation, the Project Site is not located within a zone identified as having a potential for liquefaction by the CGS, therefore soil liquefaction is not likely to occur at the Project Site. The Project Site is located on relatively flat ground and is not adjacent to any areas with steep slopes that could produce a landslide in the event that ground shaking occurred at the Project Site.

Alternative 1 would involve no construction nor operations that would increase risk of loss, injury, or death involving rupture of a known earthquake fault or unstable seismic conditions. As such, Alternative 1 would avoid the Project’s less than significant impacts during construction and operation. Thus, impacts would be less under Alternative 1 when compared to the Project As such, Alternative 1 would avoid the Project’s less than significant impacts related to seismic-related events. Thus, impacts related to seismic-related ground failure including liquefaction would be less under Alternative 1 when compared to the Project.

Alternative 1 would involve no construction nor operations and there would be no potential for substantial soil erosion or the loss of topsoil. As such, Alternative 1 would avoid the proposed Project’s less than significant impact. Thus, impacts related to soil erosion would be less under Alternative 1 when compared to the Project. Alternative 1 would involve no construction nor operations; therefore, there would be no potential to expose people or structures to on- or off-site landslides, lateral spreading, subsidence, liquefaction or collapse. As such, Alternative 1 would avoid the Project’s less significant impact. Thus, impacts related to lateral spreading, subsidence, liquefaction or collapse, and expansive soils would be less when compared to the Project.

As discussed in Section 4.7, Geology and Soils, of this Draft EIR, the Project is situated in a highly disturbed environment and there are no unique geologic features located on or around the Project Site. However, because the Project construction would require earthwork and removal of soil, there is potential for the discovery of unknown paleontological resources. Therefore, the Project would implement MM GEO-1, which outlines the process for discovery of paleontological resources. With implementation of MM GEO-1, Project impacts would be less than significant.

Alternative 1 would involve no construction nor operations; therefore, there would be no potential to destroy a unique paleontological resource. Thus, impacts related to paleontological resources would be less under Alternative 1 when compared to the Project.

Riverview Marketplace Commercial Project
Environmental Impact Report 5.0 Alternatives
City of Bakersfield – SCH No. 2025101507 5-8
Greenhouse Gas Emissions
Under the No Build/No Project Alternative, the Project would not be constructed. No construction activities would occur, and no operational land uses that generate GHG emissions would be established on the Project Site. With respect to GHG emissions generation, no construction equipment would operate on the Project Site, and no vehicle trips, energy consumption, water use, or solid waste generation associated with project operations would occur. No GHG emissions, either directly or indirectly, would be generated. No impact would occur.

Under the Project, implementation of MM GHG-1 through MM GHG-7 would contribute to minimizing project-related energy sector and mobile source GHG emissions to the extent feasible.

However, the Project would still result in a net increase in GHG emissions. Thus, the Project’s GHG emissions and contribution to global climate change impacts are significant and unavoidable and considered cumulatively considerable.

Alternative 1 would avoid the Project’s significant and unavoidable GHG impacts. Thus, impacts would be less under Alternative 1 when compared to the Project.

Hazards and Hazardous Materials
As discussed in Section 4.19, Hazards and Hazardous Materials, of this Draft EIR, Construction activities required for the Project would involve excavation, grading, and other ground-disturbing activities. However, continued compliance with laws, regulations, and policies governing the use of these materials would ensure that Project implementation would not serve to increase public or environmental exposure to hazardous materials. Therefore, impacts under the Project would be less than significant.

The Project would construct various commercial buildings including a gas station and car wash.

Compliance with applicable federal, state, and local requirements concerning the handling, storage and disposal of hazardous waste would reduce any potential to release contaminants.

Therefore, impacts related to the routine transport, use, and disposal of hazardous materials would be less than significant. Project operations would not emit hazardous emissions or handle hazardous or acutely hazardous materials, substances, or waste within one-quarter mile of an existing or proposed school. Impacts would be less than significant. During both construction and long-term operation, the Project would be required to maintain adequate emergency access for emergency vehicles. Furthermore, compliance with the fire code and local ordinances would ensure that the Project would not impair an adopted emergency response plan or emergency evacuation plan. Therefore, the Project would not interfere within an adopted emergency response plan or emergency evacuation plan.

Alternative 1 would involve no construction nor operations on the Project Site; therefore, it would not change the potential for the routine transport, use, or disposal of hazardous materials into the environment compared to existing conditions. The No Build/No Project Alternative would have no impact with regard to development creating hazardous materials or expose people or structures to a significant loss, injury, or death involving wildfires or interference with an emergency operations plan. Thus, impacts would be less under Alternative 1 than the Project.

Hydrology and Water Quality
As discussed in Section 4.10, Hydrology and Water Quality, of this Draft EIR construction of the Project would include site preparation, and other earthwork activities that have the potential to result in erosion on and adjacent to the Project Site. The Project would be required to comply with Riverview Marketplace Commercial Project
Environmental Impact Report 5.0 Alternatives
City of Bakersfield – SCH No. 2025101507 5-9
the NPDES General Permit for stormwater discharges. Construction activities subject to the General Permit include clearing, grading, stockpiling and excavation. To conform to the requirements of the General Permit, a SWPPP would need to be prepared that specifies Best Management Practices (BMPs) to prevent construction pollutants from moving offsite.

During operation, the Project’s operational urban stormwater discharges are covered under the Central Valley Water Quality Control Board National Pollutant Discharge Elimination System Permit and Waste Discharge Requirements General Permit for Discharges from Municipal Separate Storm Sewer (MS4 Permit). The Project would be required to implement a stormwater management framework to ensure that water quality is maintained within the city because of operational stormwater discharges throughout the City, including the Project Site. By complying with regulations, the Project would not violate any water quality standards or waste discharge requirements. The Project would not result in on-site and off-site erosion and siltation and would not significantly impact local groundwater recharge or impede sustainable groundwater management of the basin.

Alternative 1 would involve no construction nor operations activities on the Project Site.

Accordingly, Alternative 1 would have no impacts with regard to flooding or existing drainage pattern of the Project Site. No impact would occur regarding any water quality standards or waste discharge requirements or groundwater recharge. Thus, impacts would be less under Alternative 1.

Land Use and Planning
Under the No Build/No Project Alternative, the commercial development and improvements would not be constructed. The Project Site would remain vacant and retain its existing General Plan land use designation of P and zoning of M-2.

With respect to conflicts with land use plans, policies, or regulations adopted for the purpose of avoiding or mitigating environmental effects no development would occur, and no potential conflict with the General Plan, City Zoning Code, or any other applicable land use plan or policy would result. The Project Site would remain consistent with its existing designations by default. No impact would occur.

Therefore, land use and planning impacts under the No Build/No Project Alternative would not occur, which is less than the Project’s less than significant impacts. However, it should be noted that while the No Build/No Project Alternative avoids the General Plan Amendment, it also foregoes the General Plan policies that speak to accommodate new commercial development, promote infill development, and providing new land uses that serve the City’s population and provide for new job growth.

Mineral Resources
The Project Site does not serve as an active mining site, nor is there any mining activity in the Project vicinity. Additionally, all wells located on site have been permanently plugged and abandoned. The Project Site is not designated as Mineral and Petroleum (R-MP), which is a land use designation utilized for areas which contain producing, or potentially productive, petroleum fields and mineral deposits. Therefore, similar to the Project, the No Build/No Project Alternative would not result in the loss of availability of a locally important mineral resource recovery site and there would be less than significant impacts. Impacts would be the same under the No Build/No Project Alternative.

Riverview Marketplace Commercial Project
Environmental Impact Report 5.0 Alternatives
City of Bakersfield – SCH No. 2025101507 5-10
Noise
Under the No Build/No Project Alternative, the proposed commercial development and associated improvements would not be constructed. No ground disturbance, grading, demolition, or construction activities would occur on the Project Site. The Project Site would remain vacant, and no new stationary noise sources (loading and unloading activities, mechanical equipment, car wash, drive-thru, etc.) or project-generated vehicle trips would be introduced.

With respect to generation of a substantial temporary or permanent increase in ambient noise levels, under Alternative 1, no construction equipment would operate on the Project Site and no construction-phase noise would be generated.

Operationally, no new stationary noise sources would be introduced. The Project Site is currently vacant and generates no noise. Under the No Build/No Project Alternative, the existing ambient noise environment in the project vicinity, would not be altered. No temporary or permanent increase in ambient noise levels would occur. No impact would result. With respect to generation of excessive groundborne vibration, no ground-disturbing construction activities would occur and no vibratory equipment would be operated. No operational vibration sources associated with a commercial center would be introduced. No impact would result. Therefore, noise and vibration impacts under the No Build/No Project Alternative would not occur, which is less than the Project’s less than significant impacts.

Population and Housing
As discussed in Section 4.14, Population and Housing, of this Draft EIR, it is anticipated that future employees of the Project would reside within the city and surrounding area, and commute to work.

Therefore, an increased demand for housing to accommodate workers would not occur due to Project operations. Impacts would be less than significant and no mitigation is required.

Alternative 1 would involve no construction or operations activities that would induce substantial unplanned population growth. Accordingly, no impacts would occur. Thus, impacts related to inducement of unplanned population growth would be less under Alternative 1 than the Project’s less than significant impacts.

Public Services
Fire Protection
As discussed in Section 4.15, Public Services, of this Draft EIR, the Project’s demand for fire protection and emergency response during construction and operation would be less than significant.

As a proposed commercial development with no residential component, the Project is unlikely to have a substantial effect on the existing ratio of firefighters to residents and would result in a less than significant increase on the demand for fire and emergency services. Additionally, the Project would be constructed pursuant to CFC requirements and industry standards that include regulatory requirements that would aid in fire safety and support fire suppression activities, such as a fire protection system, automatic fire sprinklers, paved access, and required aisle widths that would be subject to review by KCFD. Further, the Project would be subject to applicable development impact fees relating to fire protection. This would allow the fire department to offset any increased demand that may result from the Project. Accordingly, the Project would not result in the need for new or physically altered fire protection facilities, and any impact to fire protection would be less than significant.

Riverview Marketplace Commercial Project
Environmental Impact Report 5.0 Alternatives
City of Bakersfield – SCH No. 2025101507 5-11
Alternative 1 would involve no construction or operations activities that would result in an increase demand for fire protection services. As such, Alternative 1 would avoid the Project’s less than significant impact related to fire protection services and no impacts would occur. Thus, impacts related to fire protection services would be less under Alternative 1 than the Project.

Police Services
As discussed in Section 4.15, Public Services, of this Draft EIR, the Project’s demand for police services during construction and operation would be less than significant.

As a commercial development, the Project development and operation could result in an incremental increase in demand for police protection services as the development would draw new customers and visitors to the Project that could result in increased amount of police demand.

However, it is likely that individual stores would include security and anti-theft measures that would reduce calls for service. Therefore, it is unlikely the proposed Project would generate the number of calls necessary to negatively affect service ratios, response times, or other police department performance objectives. Additionally, the Project would also be subject to applicable development impact fees that would fund police services and facilities to meet future demand.

Accordingly, the Project would not result in the need for new or physically altered police department facilities, and any impact to police protection would be less than significant.

Alternative 1 would involve no construction or operations activities that would result in an increase demand for police services. Thus, impacts related to police protection services would be less under Alternative 1 than the Project.

Parks
The Project is non-residential, and it is anticipated that future employees of the Project would reside within the City and immediately surrounding area. It is anticipated that future employees would continue to use park facilities near their homes and use of parks or other recreational facilities close to the Project site would be nominal. Therefore, impacts related to parks as a result of the Project would be less than significant.

Alternative 1 would involve no construction or operations activities that would increase future employment within the City and immediately surrounding area; therefore, it would have no impact related to parks. As such, Alternative 1 would avoid the Project’s less than significant impact related to parks. Thus, impacts related to parks would be less under Alternative 1 than the Project.

Schools
The Project would not generate any new students nor increase demand for school services.

Moreover, payment of impact fees in compliance with State law would mitigate any impacts to school facilities. Therefore, impacts to schools as a result of the Project would be less than significant.

Alternative 1 would involve no construction or operations activities that would increase the population; therefore, it would have no impact related to schools. Thus, impacts related to schools would be less under Alternative 1 than the Project’s less than significant impact.

Other
Other public facilities typically pertain to services such as public libraries. It is anticipated that future employees of the proposed Project would reside within the City and immediately Riverview Marketplace Commercial Project
Environmental Impact Report 5.0 Alternatives
City of Bakersfield – SCH No. 2025101507 5-12
surrounding area. The Project would not result in substantial unplanned population growth, affecting service ratios, response times, or other performance objectives for other services such as libraries. Therefore, impacts to other services would be less than significant.

Alternative 1 would involve no construction or operations activities that would result in construction or unplanned population growth; therefore, no impacts would occur in regard to other services.

Thus, impacts related to other services would be less under Alternative 1 than the Project.

Recreation
The Project would involve the development of a commercial marketplace that includes a detention basin on the northern portion of the Project Site that would be fenced and screened with landscaping. Near the detention basin would be a play area, which would include landscaped mounds, benches, picnic tables, bike racks and a lawn area. As discussed under Threshold REC-1, the Project would not increase demand on existing recreational facilities to the degree that new or expanded recreational facilities would be required. Therefore, the Project would not require the construction of new or expansion of existing recreational facilities beyond what is proposed on-site that could result in an adverse physical effect on the environment. Any impact would be less than significant.

Alternative 1 would involve no construction or operations activities that would increase population or employment within the City and surrounding area. As such, Alternative 1 would have no impact on neighborhood and regional parks and would avoid the Project’s less than significant impacts.

Thus, impacts related to neighborhood and regional parks would be less under Alternative 1 than the Project.

Transportation
The Project would exceed VMT significance thresholds for both retail and non-retail uses. The Project has been designed to incorporate feasible VMT reducing strategies as PDFs consistent with State guidance and best practices, including enhanced pedestrian connectivity, new and expanded bicycle facilities, and end-of-trip bicycle amenities. These reductions would meaningfully reduce VMT associated with retail uses and employee commute trips and represent a good-faith effort to minimize vehicle travel to the extent feasible given the project’s location and operational characteristics. However, the reduction in VMT from the PDFs would not reduce VMT impacts to a less than significant level. As such, the Project would result in a significant and unavoidable impact.

Under the No Build/No Project Alternative, the commercial development would not be constructed. No construction activities would occur, no new vehicle trips would be generated, and no permanent employees or residents would be added to the Project Site. Therefore, VMT transportation impacts under the No Build/No Project Alternative would not occur.

With respect to substantial increases in hazards due to geometric design features, no driveways or site access points would be constructed. No offsite improvements would be made, including modifications to the existing signalized intersection of Coffee Road and Jet Way. Specifically, the improvements would include the installation of a new traffic light pole/structure at the southeast corner of the Coffee Road and Jet Way intersection and any necessary roadway improvements (i.e., modification to the existing raised median to provide a dedicated left-turn lane, roadway striping).

Riverview Marketplace Commercial Project
Environmental Impact Report 5.0 Alternatives
City of Bakersfield – SCH No. 2025101507 5-13
The Project would also provide new sidewalks along its frontages, and a new bicycle lane along Rosedale Drive, which extends the existing facilities in the future. Impacts associated with this alternative would be less than the Project. However, under the No Build/No Project Alternative, pedestrian, bicycle improvements and offsite traffic improvements would not occur.

Tribal Cultural Resources
The Project does not contain any resources that are likely to have historic significance.

A search of the Sacred Lands File (SLF) was conducted through the Native American Heritage Commission (NAHC) to determine if any sacred lands or traditional cultural properties on file with the NAHC were within or near the Project site. The NAHC’s SLF record search was negative, indicating that there is no record of sacred lands on the Project site.

In compliance with AB 52/SB 18 the City provided formal notification to California Native American Tribal representatives identified by the NAHC. Native American groups may have knowledge about the area’s cultural resources and may have concerns about a development’s adverse effects on Tribal cultural resources (TCRs). AB 52/SB 18 allows tribes 30 days after receiving notification to request consultation. On March 26, 2026, the City contacted representatives of the following Tribes:
• Santa Rosa Rancheria
• Kitanemuk & Yowlumne Tejon Indians
• Kawaiisu Tribe
• Tubaltulabals of Kern Valley
• Tule River Indian Tribe
• Chumash Council of Bakersfield
• Tejon Indian Tribe
• Kern Valley Indian Council
• Chalon Indian Council of Bakersfield
The above listed Tribes did not respond to the request for consultation and have opted out of the AB 52 and SB 18 consultation process. Therefore, the City has completed tribal consultation as provided for by AB 52/SB 18. Outgoing correspondence to representatives is included in Appendix K, though no response has been received.

Although no TCRs were identified in the Project site, ground-disturbing activities have the potential to reveal buried TCRs not observed on the surface. Therefore, the Project would implement Mitigation Measures (MM) CUL-1 and CUL-2. MM CUL-1 would require that field personnel be alerted to the possibility of buried prehistoric or historic cultural deposits prior to initiation of ground-disturbing activities. MM CUL-1 would also provide a process for treatment of any archaeological resources inadvertently discovered during Project implementation.

Implementation of MM CUL-1 shall also require a cessation of construction activity and consultation with a qualified archaeologist to evaluate the Project Site and make the necessary findings. MM CUL-2, would require a cessation of construction activity in the event of an inadvertent discovery of human remains until the County coroner can evaluate the discovery and Riverview Marketplace Commercial Project
Environmental Impact Report 5.0 Alternatives
City of Bakersfield – SCH No. 2025101507 5-14
made the necessary findings. MM CUL-2 would also provide a process for treatment of any human remains inadvertently discovered during Project implementation. With implementation of MM CUL-1 and MM CUL-2, impacts to TCRs remains would be less than significant with mitigation incorporated.

Alternative 1 would involve no construction nor operations that would result in site disturbance that could impact TCRs. As such, Alternative 1 would avoid the Project’s less than significant impact (after mitigation) related to the potential of any impacts to TCRs. Thus, impacts would be less under Alternative 1 than the Project.

Utilities and Service Systems
The Project will not require the construction of new water, wastewater treatment, or stormwater drainage, electric power, natural gas, or telecommunications facilities offsite. Therefore, impacts associated with both construction and operation of the Project would be less than significant.

Impacts on water demand and wastewater would also be less than significant.

Alternative 1 would involve no construction or operations activities that would involve any new development and thus would not include any construction of new or expanded water, wastewater treatment, or stormwater drainage, electric power, natural gas, or telecommunications facilities offsite. Thus, impacts related utilities and service systems would be “less” under Alternative 1 than the Project’s less than significant impacts.

The Project would not generate solid waste in excess of State and local standards, or in excess of the capacity of local infrastructure, and would comply with CALGreen, State regulations, and City regulations regarding solid waste management. Accordingly, any impacts would be less than significant.

Alternative 1 would involve no construction or operations activities that would involve any development and thus would not generate solid waste in excess of state and local standards.

Accordingly, Alternative 1 would have no impact and would avoid the Project’s less than significant impact related to solid waste. Thus, impacts related to solid waste would be less under Alternative 1 than the Project.