Wildfire
The Project Site is not located in or near an SRA and does not contain lands classified as VHFHSZs. The Project Site is located on relatively flat ground and is not adjacent to any areas with steep slopes that could produce a landslide. It also is not located downstream of any bodies of water that would result in flooding to the Project Site. As such, the Project would not expose people or structures to significant risks as a result of runoff, post-fire slope instability, or drainage changes. No impact would occur.

As no development would occur under Alternative 1, impacts would be the same the impacts related to the Project.

Relationship of the Alternative to the Project Objectives As described above, Alternative 1 assumes that no new development would occur on the Project Site. As the No Build/No Project alternative would not include a development program, the Alternative 1 would not meet any of the objectives of the Project.

Riverview Marketplace Commercial Project
Environmental Impact Report 5.0 Alternatives
City of Bakersfield – SCH No. 2025101507 5-15

5.5.2 Alternative 2: Reduced Project Alternative
Description of the Alternative
Reduced Project Alternative assumes a 25% reduction of all proposed Project land uses.

Accordingly, the total commercial square footage would be reduced from 405,531 square feet to approximately 304,148 square feet and the total number of dual sided fuel pumps would be reduced from 20 to 15. The buildings would be constructed in the same general arrangement as currently proposed and set forth in the site plan, but with a smaller footprint. The areas not covered by buildings would be used for surface parking for passenger vehicles and the site’s vehicular access would be the same general arrangement as currently proposed and set forth in the site plan. The development characteristics of this Reduced Project Alternative are assumed to be similar to those of the Project, including excavation and earth movement.

Environmental Impacts
Aesthetics
Alternative 2 would occur on the same Project Site as the Project. Regarding scenic quality/regulatory compliance, the Project Site is located in an urbanized area; accordingly, the applicable threshold focuses on consistency with applicable zoning and regulations governing scenic quality would be the same. While less development would occur, the site plan, type of architecture and landscaping would be similar under Alternative 2 to the Project, and would still improve the Project Site compared to existing conditions. Scenic quality impacts would be similar to the Project.

Similar to the Project, Alternative 2 is not situated in one of the areas the City has recognized as featuring scenic vistas or along a scenic route as identified in the City’s General Plan. Accordingly, similar to the Project, Alternative 2 would not block a view corridor of a scenic resource.

Regarding light and glare, while less development would occur, Alternative 2 would still result in light and glare impacts, albeit less than the Project. Overall, Alternative 2 would result in the same aesthetic impacts as the Project.

Agriculture and Forestry Resources
The Project Site is in an urbanized area of the City. Additionally, the Project Site is identified as vacant and disturbed land and therefore does not support agricultural resources or operations.

As discussed in Section 4.2, Agricultural and Forestry Resources, the Project would not result in the conversion of designated farmland to non-agricultural uses, or forest land to non-forestland.

Similar to the Project, no impact would occur. Impacts would be the same under Alternative 2 as the Project.

Air Quality
Regarding construction, although the types of land uses under Alternative 2 would remain unchanged compared to the Project, the amount of land uses developed would be generally reduced by 25 percent overall. The reduction in development intensity could result in less intense construction activities overall and in a given year. Because the Project Site area (overall site acreage) would remain the same under under Alternative 2, it is anticipated that the amount and area of grading and other ground disturbing activities under this alternative would be similar to Riverview Marketplace Commercial Project
Environmental Impact Report 5.0 Alternatives
City of Bakersfield – SCH No. 2025101507 5-16
the Project. However, there would be a reduction in vertical building construction due to the reduction in overall land uses that would be developed.

Thus, it is anticipated that construction activities under Alternative 2 would result in either similar or reduced regional and localized air quality impacts identified for the Project. As discussed in the DEIR, the Project would not exceed the SJVAPCD regional significance thresholds and ambient air quality screening thresholds for construction. Additionally, the Project would also not exceed the SJVAPCD health risk significance thresholds for construction. Therefore, similar to the Project, Alternative 2 would also result in less than significant regional and localized construction-related air quality impacts, however impacts would be less than that of the Project.

For regional operation-phase impacts, because the types and mix of land uses under Alternative 2 would remain unchanged from the Project, this alternative would generate approximately 25 percent less operation emissions. Though annual VOC emissions would be reduced under this alternative, they would still exceed the SJVAPCD regional significance threshold. Therefore, Alternative 2, alternative would not eliminate any of the Mitigation Measures (MM AQ-1, MM AQ-2, MM GHG-1 through MM GHG-3) required by the Project.

Regarding potential operation-related localized air quality impacts, this alternative would result in similar or slightly reduced risk impacts associated with toxic air contaminants (TACs) because it would consist of the same commercial and retail land use types and mix compared to the Project with a 25 percent reduction in land use development. Overall, similar to the Project, Alternative 2 would result in less than significant operation-related health risk and CO hotspot impacts.

Alternative 2 would result in similar construction- and operation-related odor impacts compared to the Project because it would be composed of the same land use types and mix. Additionally, it would comprise the same site area and would require similar or slightly less intense construction activities. Alternative 2 would also result in less than significant odor impacts similar to the Project.

Overall, impacts would be less under Alternative 2 than the Project, however the impacts would continue to be significant and all of the mitigation measures would remain applicable.

Biological Resources
As Alternative 2 would require the same development footprint as the Project and is in the same location as the Project, impacts would be similar. Project Mitigation Measures MM BIO-1 through MM BIO-3 would remain applicable under Alternative 2. Impacts would be the same as the Project.

Cultural Resources
As Alternative 2 would require the same development footprint as the Project and is in the same location as the Project, impacts would be similar. Project Mitigation Measures MM CUL-1 and MM CUL-2, would remain applicable under Alternative 2. Impacts would be the same as the Project.

Energy
Alternative 2 would be developed in the same area as the Project with the same land use types and mix, but at a 25 percent reduced development intensity. Based on the development under this alternative, construction-related energy impacts would be similar to or slightly less than the Project. The reduced development intensity could result in less vertical construction and potentially fewer vertical construction days, construction workers, material deliveries, and/or Riverview Marketplace Commercial Project
Environmental Impact Report 5.0 Alternatives
City of Bakersfield – SCH No. 2025101507 5-17
construction equipment compared to the Project, which would result in a decrease in electricity and transportation fuel demands. The Project was determined to result in less than significant construction-related energy impacts. Thus, Alternative 2 would also result in less than significant construction-related energy impacts.

For operation-related energy impacts, Alternative 2 would result in similar to or slightly reduced impacts compared to the Project as it would develop the same land use types and mix, but at a reduced intensity by 25 percent. Similar to the Project, operation of the Alternative 2 would not result in inefficient, wasteful, or unnecessary energy demands. Overall, Alternative 2 would be designed and built to comply with the 2025 Building Energy Efficiency Standards and the 2025 California Green Building Standards Code (CALGreen). While it is anticipated that this alternative would generate less onsite renewable electricity compared to the Project due to the 25 percent reduction in land use intensity and available building rooftop space, it would still be designed to be in compliance with the photovoltaic (PV) and battery storage requirements of the 2025 Building Energy Efficiency Standards. Furthermore, Alternative 2 would also result in approximately 25 percent reduction in building energy demand and transportation fuels due to the reduction in building space developed and overall reduction in vehicle trips generated.

Alternative 2 would also result in less than significant operation-related energy impacts.

Additionally, because this alternative would still be subject to and comply with the PV and battery storage requirements of the 2025 Building Energy Efficiency Standards, it would support and align with the California Renewables Portfolio Standard (RPS) and the overall goal to transition the State to renewable energy. Overall, Alternative 2 would result in less than significant impacts, similar to the Project.

Geology and Soils
As Alternative 2 would require the same development footprint as the Project and is in the same location as the Project, impacts would be similar. Similar to the Project, Alternative 2 would not exacerbate existing environmental conditions related to seismic ground shaking at the Project Site because Alternative 2 would not involve mining operations, excavation of large areas, or the extraction or injection of oil or groundwater, which could create unstable seismic conditions that would exacerbate ground shaking. Additionally, mandatory compliance with applicable regulatory requirements and incorporation of the recommendations included in the Geotechnical Investigation would reduce the potential for significant damage to structures resulting from strong seismic ground shaking and the exposure of people or structures to potential substantial adverse effects to less than significant.

Similar to the Project, Alternative 2 is located on relatively flat ground and is not adjacent to any areas with steep slopes that could produce a landslide in the event that ground shaking occurred at the Project Site. Impacts related to seismic-related ground failure including liquefaction, soil erosion, on- or off-site landslides, lateral spreading, subsidence, liquefaction or collapse would be less than significant, and similar to the Project.

As discussed in Section 4.7, Geology and Soils, of this Draft EIR, the Project Site is situated in a highly disturbed environment and there are no unique geologic features located on or around the Project Site. However, because the Project construction would require earthwork and removal of soil, there is potential for the discovery of unknown paleontological resources. Therefore, Project Mitigation Measure MM GEO-1 would remain applicable under Alternative 2. Impacts would be the same as the Project.

Overall, impacts would be similar to the Project and would be less than significant.

Riverview Marketplace Commercial Project
Environmental Impact Report 5.0 Alternatives
City of Bakersfield – SCH No. 2025101507 5-18
Greenhouse Gas Emissions
Alternative 2 would develop the same land use types and mix over the same project Site area as the proposed Project at a reduced development intensity of 25 percent. As discussed in the DEIR, the Project would generate GHG emissions and would not meet the net zero emissions threshold.

Additionally, overall, the Project would result in significant GHG emissions impacts even with incorporation of Mitigation Measures MM GHG-1 through MM GHG-7.

While Alternative 2 would reduce development intensity by 25 percent, thereby also reducing a proportionate amount of operation-related GHG emissions, it would still generate GHG emissions and would not meet the net zero emissions threshold. Thus, Alternative 2 would still require MM GHG-1 through MM GHG-7 as the Project. Similar to the Project, even with implementation of Mitigation Measures, Alternative 2 would still not achieve net zero GHG emissions and would have a substantial cumulative contribution to GHG emissions impacts.

Regarding consistency with the California Air Resources Board (CARB) Scoping Plan, this alternative would also be subject to the programs and regulations identified by the Scoping Plan and implemented by state, regional, and local agencies to achieve the statewide GHG reduction goals of AB 32 and SB 32. As stated, this alternative would still be subject to and comply with the 2025 Building Energy Efficiency Standards and the standards under 2025 CALGreen. It would install onsite PV and battery storage systems per the 2025 Building Energy Efficiency Standards and EV parking per the 2025 CALGreen. Therefore, and similar to the Project, this alternative would not obstruct implementation nor be inconsistent with the CARB Scoping Plan.

For the Kern Council of Governments (Kern COG) 2022 Regional Transportation Plan/Sustainable Communities Strategy (RTP/SCS), the Project was determined to interfere with Kern COG’s ability to implement the 2022 RTP/SCS. The Project would result in an overall net increase in countywide roadway vehicle miles traveled (VMT) under both existing and cumulative conditions. Overall, Alternative 2 would generate fewer average daily vehicle trips due to the reduced development intensity. Thus, the reduction in vehicle trips would also result in a reduction in overall total VMT compared to the proposed project. However, VMT is influenced by a variety of factors beyond development size, including trip lengths, customer travel behavior, employee commute patterns, regional accessibility, and the mix of on-site uses. Thus, although Alternative 2 could result in a reduction in VMT compared to the Project, the reduced development intensity under this alternative may not be sufficient to result in less than significant VMT impacts.

Therefore, and similar to the Project, this alternative would also be considered to be inconsistent with the Kern COG 2022 RTP/SCS.

Overall, impacts would be less under Alternative 2 than the Project; however, the impacts would remain significant and unavoidable.

Hazards and Hazardous Materials
As Alternative 2 would require the same development footprint as the Project and is in the same location as the Project, impacts would be similar. Similar to the Project, construction activities required for the Project would involve excavation, grading, and other ground-disturbing activities.

However, continued compliance with laws, regulations, and policies governing the use of these materials would ensure that Alternative 2 implementation would not serve to increase public or environmental exposure to hazardous materials.

Similar to the Project, impacts related to the routine transport, use, and disposal of hazardous materials under Alternative 2 would be less than significant. Operations would not emit hazardous Riverview Marketplace Commercial Project
Environmental Impact Report 5.0 Alternatives
City of Bakersfield – SCH No. 2025101507 5-19
emissions or handle hazardous or acutely hazardous materials, substances, or waste within one-quarter mile of an existing or proposed school. Impacts would be less than significant. During both construction and long-term operation, development under Alternative 2 would be required to maintain adequate emergency access for emergency vehicles. Furthermore, compliance with the fire code and local ordinances would ensure that the Alternative 2 would not impair an adopted emergency response plan or emergency evacuation plan.

Like the Project-related impacts, the hazards and hazardous materials impacts would remain less than significant under Alternative 2.

Hydrology and Water Quality
Similar to the Project, development under Alternative 2 would include site preparation, and other earthwork activities that have the potential to result in erosion on and adjacent to the Project Site.

Similar to the Project, Alternative 2 would be required to comply with the NPDES General Permit for stormwater discharges. Construction activities subject to the General Permit include clearing, grading, stockpiling and excavation. To conform to the requirements of the General Permit, a SWPPP would need to be prepared that specifies Best Management Practices (BMPs) to prevent construction pollutants from moving offsite.

During operation, Alternative 2’s operational urban stormwater discharges are covered under the Central Valley Water Quality Control Board National Pollutant Discharge Elimination System Permit and Waste Discharge Requirements General Permit for Discharges from Municipal Separate Storm Sewer (MS4 Permit). Alternative 2 would be required to implement a stormwater management framework to ensure that water quality is maintained within the City because of operational stormwater discharges throughout the City, including the Project Site. By complying with regulations, Alternative 2 would not violate any water quality standards or waste discharge requirements. Similar to the Project, Alternative 2 would not result in on-site and off-site erosion and siltation and would not significantly impact local groundwater recharge or impede sustainable groundwater management of the basin.

With compliance with regulations, impacts with regard to flooding or existing drainage pattern of the Project Site would be less than significant and would be similar to the Project. Any impacts regarding water quality standards or waste discharge requirements or groundwater recharge would be less than significant.

Thus, both the impacts under Alternative 2 and the Project would be less than significant.

Land Use and Planning
As described in Section 4.11, Land Use and Planning, of this Draft EIR the Project would not physically divide an established community. Similar to the Project, Alternative 2 would redevelop an undeveloped property into a commercial retail center. Construction and operation of the proposed Project would be limited to the boundaries of the affected parcel and the identified off-site areas and would not encroach upon the surrounding area. Alternative 2 would not include the development of new obstacles that would divide the existing community. Similar to the Project, Alternative 2 would not physically divide an established community, and no impact would occur.

Similar to the Project, Alternative 2 would not conflict with any land use plan, policy, or regulation.

As a new commercial use, Alternative 2 would be consistent with General Plan policies that seek to accommodate new development which complements existing uses and provides a mixture of Riverview Marketplace Commercial Project
Environmental Impact Report 5.0 Alternatives
City of Bakersfield – SCH No. 2025101507 5-20
uses that supports the needs of residents. While smaller in scale than the Project, Alternative 2 would also provide a variety of new jobs.

Similar to the Project, Alternative 2 would redevelop the Project Site with a commercial marketplace development and seek a land use designation change to LI. This land use designation change would be consistent with the Project Site’s existing zoning designation and the City’s vision for the area.

Accordingly, Alternative 2 would have less than significant impacts. Impacts under Alternative 2 would be the same as the Project.

Mineral Resources
The Project Site does not serve as an active mining site, nor is there any mining activity in the Project vicinity. Additionally, all wells located on site have been permanently plugged and abandoned. Similar to the Project, Alternative 2 would not result in the loss of availability of a locally important mineral resource recovery site and there would be less than significant impacts.

Impacts would be the same as the Project.

Noise
Construction Vehicles
Under the Alternative 2, it is anticipated that the amount and area of grading and other ground disturbing activities under this alternative would be similar to Project. As such, the maximum number of workers and transport of materials to and from the construction site would remain similar to the proposed project and would result in incremental increases in noise levels along Rosedale Highway. Individual construction vehicle pass-bys may create momentary noise levels of up to approximately 85 dBA (Lmax) at 50 feet from the vehicle, but these occurrences would generally be infrequent and short-lived. Because Alternative 2 would require the same level of ground disturbance, similar levels of vendor and haul trips would be required. A maximum of 140 daily haul truck tips is estimated during off-site improvements. The addition of these construction trips would be temporary, resulting in a construction traffic noise increase of less than 0.1 dBA CNEL, and would not substantially increase ambient noise levels. Therefore, construction traffic noise impacts related to the Alternative 2 would be less than significant and similar to the Project.

Construction Equipment
Alternative 2 would require the same construction activities (e.g., site preparation, demolition, and paving) as the Project. As the overall site area would remain the same as the proposed Project, these construction activities would remain the same distance away from the nearby sensitive receptors as the Project. Similar to the Project, construction noise levels due to development of Phase 1 and Phase 2 would be below the Federal Transit Administration (FTA) thresholds for residential (80 dBA Leq) and commercial uses (85 dBA Leq). Therefore, construction noise impacts related to the Alternative 2 would be less than significant and similar to the Project.

Construction Noise from Off-Site Roadway Improvements
Alternative 2 would include the roadway improvements along Rosedale Highway and Coffee Road, similar to the Project. Construction activities from roadway improvements would not expose surrounding sensitive receptors to prolonged periods of construction noise. Though some equipment could reach up to 85 dBA Leq at a distance of 50 feet, construction for the off-site improvements would progress in a linear fashion, generating less noise at each receptor each Riverview Marketplace Commercial Project
Environmental Impact Report 5.0 Alternatives
City of Bakersfield – SCH No. 2025101507 5-21
day. The nearest off-site sensitive receptor is approximately 700 feet south of the proposed roadway improvements and noise levels would be up to 62 dBA Leq. Additionally, off-site roadway improvements under the Alternative 2 and the Project would be temporary and anticipated to last a limited period, and would not occur during nighttime hours.

Construction noise levels due to off-site roadway improvements of the Project and this alternative would be below the FTA thresholds for residential (80 dBA Leq) and commercial uses (85 dBA Leq). Therefore, as with the Project, off-site roadway improvements construction noise impacts related to the Alternative 2 would be less than significant.

Mobile-Source Noise Impacts
Alternative 2 assumes a 25 percent reduction of all proposed land uses, therefore, the Reduced Project Alternative would result in 25 percent less trips than the Project. Similar to the Project, The Reduced Project Alternative’s cumulative traffic noise increase over existing conditions would be less than significant.

Stationary-Source Noise Impacts
Operational noise generated by Alternative 2 would be lower than that of the Project due to the reduction in building area and associated activity levels. Because the same operational noise sources would remain under the Alternative 2, the nature of the operational noise impacts would be similar to those of the Project. However, the reduced scale of development would result in lower overall noise generation and fewer noise events. Therefore, like the Project-related impacts, the operational noise impacts under the Reduced Project Alternative would be less than significant.

Vibration
As the overall site would remain the same as the Project, construction activities under Alternative 2 would remain the same distance away from the nearby sensitive receptors.

Therefore, vibration impacts under the Alternative 2 would be less than significant and similar to the Project.

Population and Housing
As discussed in Section 4.14, Population and Housing, of this Draft EIR, it is anticipated that future employees of the Project would reside within the City and surrounding area, and commute to work. Therefore, an increased demand for housing to accommodate workers would not occur due to Project operations. Impacts would be less than significant and no mitigation is required.

Although the overall Project size would be reduced by 25% under Alternative 2, it is still anticipated that the future employees of the Project would reside within the City and surrounding area and commute to work. Therefore, similar to the Project, no increased demand for housing to accommodate workers is anticipated. Thus, impacts related to inducement of unplanned population growth would be the same and less than significant.

Public Services
Fire Protection
As discussed in Section 4.15, Public Services, of this Draft EIR, the Project’s demand for fire protection and emergency response during construction and operation would be less than significant. Alternative 2 would involve similar construction and operational activities as the Project Riverview Marketplace Commercial Project
Environmental Impact Report 5.0 Alternatives
City of Bakersfield – SCH No. 2025101507 5-22
but would be slightly less than the Project. As such, Alternative 2 impacts to fire protection and emergency response would be less than significant and slightly less than the Project.

Police Services
As discussed in Section 4.15, Public Services, of this Draft EIR, the Project’s demand for police services during construction and operation would be less than significant.

Alternative 2 would involve similar construction and operational activities as the Project but would be slightly less than the Project. As such, Alternative 2 impacts to police services would also be less than significant.

Parks
Similar to the Project, Alternative 2 is non-residential, and it is anticipated that future employees of the Project would reside within the City and immediately surrounding area. It is anticipated that future employees would continue to use park facilities near their homes and use of parks or other recreational facilities close to the Project site would be nominal. As such, Alternative 2 impacts to parks would also be less than significant.

Schools
Like the Project, Alternative 2 would not generate any new students nor increase demand for school services. Moreover, payment of impact fees in compliance with State law would mitigate any impacts to school facilities. Therefore, impacts to schools as a result of Alternative 2 would also be less than significant.

Other
Similar to the Project, Alternative 2 would not result in substantial unplanned population growth, affecting service ratios, response times, or other performance objectives for other services such as libraries. Therefore, impacts to libraries under Alternative 2 would also be less than significant.

Recreation
Similar to the Project, Alternative 2 would not increase demand on existing recreational facilities to the degree that new or expanded recreational facilities would be required. Therefore, impacts to recreational facilities under Alternative 2 would also be less than significant.

Transportation
Because Alternative 2 would provide less commercial/retail floor area and fewer fueling pumps, it would be expected to attract fewer customers, support fewer employees, and generate fewer service and delivery trips than the Project. As a result, the total number of vehicle trips associated with the site would likely be lower than under the Project.

Alternative 2 would not fundamentally change the nature of the proposed development or its relationship to the surrounding transportation network and land use pattern. Alternative 2 would continue to function as a commercial/retail development serving customers, employees, and deliveries within the same general market area as the proposed Project. Therefore, the travel characteristics of Project generated trips, including trip lengths and travel patterns, would generally be expected to remain similar to those associated with the Project. However, because the overall intensity of development would be reduced, the total amount of vehicle travel generated by the site would likely be lower.

Riverview Marketplace Commercial Project
Environmental Impact Report 5.0 Alternatives
City of Bakersfield – SCH No. 2025101507 5-23
While a reduction in Project intensity would be expected to reduce VMT relative to the Project, VMT is influenced by a variety of factors beyond development size, including trip lengths, customer travel behavior, employee commute patterns, regional accessibility, and the mix of on-site uses. No project-specific VMT analysis was prepared for the Reduced Project Alternative; therefore, the magnitude of any reduction in VMT cannot be quantified. As a result, it cannot be determined whether the reduction in development intensity would be sufficient to reduce the project's VMT impact to a less than significant level or avoid the significant VMT impact identified for the Project. Therefore, VMT impacts associated with Alternative 2 are assumed to significant and unavoidable.

Like the Project, development under Alternative 2 would include new bicycle and pedestrian access and amenities and would provide off-site improvements. Therefore, like the Project, Alternative 2 would not conflict with a program, plan, ordinance, or policy addressing the circulation system, including transit, roadway, bicycle, and pedestrian facilities. Impacts would be less than significant and similar to the Project.

Similar to the Project, access points and driveways to the Alternative 2 Project would be reviewed with respect to standard California Department of Transportation (Caltrans) sight distance standards at the time of preparation of final grading, landscape, and street improvement plans.

Similar to the Project. Alternative 2 would not substantially increase hazards due to a geometric design feature or incompatible land use. Therefore, impacts would be less than significant and similar to the Project.

Similar to the Project, Alternative 2 would include a Construction Management Plan that would be submitted to the City for review and approval prior to construction. It would identify construction haul routes; construction worker parking and staging areas; construction phasing and scheduling; procedures for on-site loading, unloading, and material storage; temporary traffic control measures. The Construction Management Plan would help to ensure that Alternative 2 would not impact emergency access to the Project Site and surrounding areas during construction.

During operation, similar to the Project, Alternative 2 driveways and internal drive aisles would be constructed pursuant to the City’s design standards and subject to review by KCFD. Furthermore, compliance with the fire code and local ordinances would ensure that Alternative 2 would not impair an adopted emergency response plan. Impacts would be similar to the Project and would be less than significant.

Tribal Cultural Resources
As Alternative 2 would require the same development footprint as the Project and is in the same location as the Project, impacts would be similar. Project Mitigation Measures MM CUL-1 and MM CUL-2, would remain applicable under Alternative 2. Impacts would be the same as the Project.

Utilities and Service Systems
As discussed in Section 4.18, Utilities and Services Systems, the Project’s potable water, wastewater, stormwater, electricity, natural gas, and telecommunications demands can all be met by existing municipal and utility infrastructure with only standard on-site connections or minor improvements in previously disturbed area, and without the need for new or expanded off-site facilities that could cause significant environmental effects. Impacts related to utilities and service systems would be less than significant. No mitigation measures were required.

Riverview Marketplace Commercial Project
Environmental Impact Report 5.0 Alternatives
City of Bakersfield – SCH No. 2025101507 5-24
As the amount of development under Alternative 2 is 25% less than the Project, the demands on utilities would be less, and similar to the Project, Alternative 2 will not require the construction of new water, wastewater treatment, stormwater drainage, electric power, natural gas, or telecommunications facilities offsite. Therefore, impacts associated with both construction and operation of the Alternative 2 would be less than significant.

Similarly, Alternative 2 would have less than significant impacts to water demand and wastewater capacity as the Project and impacts would be less than significant. Similar to the Project, Alternative 2 would not generate solid waste in excess of State and local standards, or in excess of the capacity of local infrastructure, and would comply with CALGreen, State regulations, and City regulations regarding solid waste management. Accordingly, any impacts would be less than significant.

Wildfire
Alternative 2 would be located within the same area as the Project and is not located in or near an SRA and does not contain lands classified as VHFHSZs. Similar to the Project, no impact would occur with respect to wildfire hazards.

Relationship of the Alternative to Project Objectives
As Reduced Project Alternative assumes a 25% reduction of all proposed Project land uses, less development would occur and impacts would be reduced, however, this Alternative would not eliminate the Project’s significant and unavoidable impacts. With less development, the Project would meet the following objectives:
• A Project that allows for the revitalization of the Project Site, adapting to changing market conditions and providing economic benefits to the City. • An infill development that promotes the sustainable principles of smart growth. • A Project that encourages and facilitates new uses of high-quality architecture and design.
• A mixture of commercial uses that provides new activity and services to the area and is cohesive with established neighborhoods, businesses, and community amenities nearby.
• A circulation system responsive to the needs of vehicular, bicycle, and pedestrian travel. • New native and drought tolerant. landscaping that visually enhances the Project Site and surrounding perimeter
• A visually harmonious development as viewed both internally and externally.

However, with reduced development, Alternative 2 would not meet the following objective related to employment and job growth to the same extent as the Project:
• Creation of new and future employment opportunities.

Riverview Marketplace Commercial Project
Environmental Impact Report 5.0 Alternatives
City of Bakersfield – SCH No. 2025101507 5-25

5.5.3 Alternative 3: Existing General Plan/Zoning Alternative Description of the Alternative
Under this alternative, it is assumed that the Project Site will be developed in accordance with the current Metropolitan Bakersfield General Plan (MBGP) land use and zoning designations. Thus, this alternative assumes the Project Site would be developed with a by-right use and no General Plan amendment or zone change is necessary. The Project Site’s current Public Facilities (P) designation, as well as the prohibitions in the deed restriction and restrictive covenant that encumber the property, significantly limit the types of uses permitted on the Project Site. Based on the site’s Public Facilities designation, the allowed uses are limited to the following:

Public Facilities (P): includes government buildings, hospitals, public utilities, cemeteries, sewage treatment plants, waste disposal sites and other publicly owned facilities.

For purposes of the analysis, the maximum allowable development of the Project Site is in accordance with the MBGP. Based thereon, Alternative 3 would consist of a municipal maintenance and storage yard that serves as the central deployment hub for a public works department. This alternative development includes facilities for fleet maintenance, material storage, and administrative offices. All existing on-site uses, except the transmission facilities, would be removed to accommodate this alternative.

Under Alternative 3, the Project Site would be developed with approximately 100,900 square feet of commercial uses, consisting of office space to accommodate multiple divisions within a public works department (i.e. parks & rec, streets, solid waste). The Project Site would also be developed with industrial uses, including a 128,000 square foot fleet services building, approximately 30 acres of construction, equipment, and stockpile storage space, a 58,000 square foot laydown with detention basin, and a 5,300 square foot fueling facility. The alternative will also include 335,000 square feet of employee parking.1
Environmental Impacts
Aesthetics
Under Alternative 3, the proposed commercial retail center and associated uses such as markets, retail/restaurants, medical offices, health club, and associated parking and landscaping would not be developed. Alternative 3 would consist of a municipal maintenance and storage yard that serves as the central deployment hub for a public works department. This alternative development includes facilities for fleet maintenance, material storage, and administrative offices.

Regarding scenic quality, aesthetic impacts would be greater, as the Project would not transform an underutilized site into an active infill commercial center with new restaurants, stores, landscaping, as well as new signage, distinctive landscape palettes, and other such elements that would provide a identity and cohesiveness to the Project Site. In addition, Alternative 3 would be less visually cohesive with the Project Site’s adjacent commercial development. Therefore, while visual quality impacts under Alternative 3 would be less than significant, they would be greater than the Project.
1 This alternative project was derived and scaled based on input from the City’s Public Works Department of desired improvements on a new 30-acre public works yard.

Riverview Marketplace Commercial Project
Environmental Impact Report 5.0 Alternatives
City of Bakersfield – SCH No. 2025101507 5-26
As the Project Stie does not contain any special or unique scenic attributes, like rock outcroppings, native vegetation, or a substantial number of mature trees, similar to the Project, Alternative 3 would not block a view corridor of a scenic resource. Regarding light and glare, new sources of nighttime lighting or daytime glare would be introduced for safety and operations, but similar to the Project, impacts would be less than significant.

Agriculture and Forestry Resources
The Project Site is in an urbanized area of the City. Additionally, the Project Site is identified as vacant and disturbed land and therefore does not support agricultural resources or operations.

As discussed in Section 4.2, Agricultural and Forestry Resources, the Project would not result in the conversion of designated farmland to non-agricultural uses, or forest land to non-forestland.

Similar to the Project, no impact would occur. Impacts would be the same under Alternative 3 as Project.

Air Quality
Regarding construction, the less intense development under Alternative 3 would result in less construction activity, less construction intensity, and an overall shorter construction duration compared to the Project. Based on these factors, it can reasonably be anticipated that Alternative 3 would result in lessened regional and localized construction impacts compared to the Project. Additionally, and similar to the Project, project-related construction activities under this alternative would also result in less than significant regional and localized air quality impacts.

Impacts would be less than the Project and would be less than significant.

For regional operation emissions and ambient air quality impacts, based on the land use types and amount under Alternative 3, it would generate 3,562 average daily trips (ADT) compared to the 13,185 ADTs that would be generated by the Project. This would result in a 73 percent reduction in vehicle trips. Additionally, this alternative would also result in lower building energy demands and area-source emissions (i.e., emissions from architectural coatings, landscaping equipment, and consumer cleaning products) due to the less intensive land use type and amount.

However, this alternative could result in the generation of fugitive dust (i.e., PM10 and PM2.5) associated with the 30-acre storage yard that would accommodate stockpiles.

Alternative 3 would likely reduce operation-related VOC and NOX emissions to below their respective SJVAPCD regional significance threshold and eliminate the need for Mitigation Measures AQ-1 and AQ-2. This alternative would also likely reduce overall CO and SOX emissions compared to the Project. Although stockpiles would be a new type of emissions source compared to the proposed Project, stockpile PM10 and PM2.5 fugitive dust emissions would be controlled through SJVAPCD Regulation II and Regulation VIII. Furthermore, it is anticipated that Alternative 3 would not result in exceedances of the SJVAPCD regional significance thresholds, ambient air quality standards, and the SJVAPCD significant impact levels (SILs). Compared to the Project, it is anticipated that Alternative 3 would result in less than significant regional air quality impacts without the need for incorporation of Mitigation Measures. Therefore, impacts are less than the Project.

Regarding operation-related health risk impacts, this alternative would introduce a 128,000 square-foot fleet services building. This land use could result in stationary equipment (e.g., spray booths) and use of products that generate TACs. However, stationary equipment or activity that could generate air toxics and may be associated with this facility would be regulated under Riverview Marketplace Commercial Project
Environmental Impact Report 5.0 Alternatives
City of Bakersfield – SCH No. 2025101507 5-27
SJVAPCD regulations. Nevertheless, this land use could also potentially result in the idling of diesel-powered vehicles and equipment that would be serviced at this facility. Emissions from mobile sources would not be subject to SJVAPCD permitting regulations and could potentially increase health risk impacts to off-site receptors. For the 5,300 square-foot fueling facility, it would also be subject to the permitting requirements under SJVAPCD Regulation II, which would control potential health risk impacts from TACs.

As discussed in the DEIR, the Project would not accommodate the types of land uses that would generate substantial quantities of TACs. Furthermore, though the Project would include a gas station, this use would be subject to SJVAPCD Regulation II, which would ensure health risks impacts are controlled. Additionally, the Project would not generate the heavy-duty truck volumes necessary to potentially expose off-site sensitive receptors to substantial pollutant concentrations of TACs along the nearby truck routes. This alternative is also not anticipated to generate the level of heavy-duty truck volumes needed along the nearby truck routes to expose off-site sensitive receptors to substantial pollutant concentrations of TACs. However, this alternative would introduce a new land use type (i.e., fleet services building) not proposed under the Project that would generate onsite TACs, which could potentially result in greater health risk impacts to offsite receptors compared to the Project and the need to incorporate reduction measures to reduce potential health risk impacts to less than significant levels. Therefore, potential health risk impacts would be greater than the Project.

For CO hotspots, this alternative is anticipated to generate fewer overall vehicle trips compared to the Project due to the less intensive land use type and amount of development. The Project would not generate the volumes of traffic needed to generate a CO hotspot. Thus, like the Project, Alternative 3 would also not result in the volumes of traffic needed to generate a CO hotspot and would further reduce this possibility compared to the Project.

For operational odors, the fleet services building under Alternative 3 could potentially accommodate autobody activities that could involve auto painting and coating activities. These types of activities are the types of activities identified by the SJVAPCD that could potentially generate odors that could have a significant odors impact. Thus, Alternative 3 could result in a potentially significant operation-related odors impact, which would be a new impact compared to the Project.

Regarding consistency with the SJVAPCD AQMPs, because Alternative 3 would develop uses based on the existing MBGP land use and zoning designations, it would not conflict with the growth assumptions of the SJVAPCD AQMPs. Additionally, Alternative 3 would likely reduce operation-related VOC and NOX emissions to below the SJVAPCD regional significance thresholds and also not generate operation-emissions that exceed the SJVAPCD regional significance thresholds for the other criteria air pollutants. Furthermore, Alternative 3 would also likely not generate emissions that would exceed either the ambient air quality standards or the SJVAPCD SILs. Similar to the Project, Alternative 3 does not conflict with the SJVAPCD AQMPs, but would not require MM AQ-1 and AQ-2 compared to the Project.

Biological Resources
As Alternative 3 would require the same development footprint as the Project and is in the same location as the Project, impacts would be similar. Project Mitigation Measures MM BIO-1 through MM BIO-3 would remain applicable under Alternative 3. Impacts would be the same as the Project.

Riverview Marketplace Commercial Project
Environmental Impact Report 5.0 Alternatives
City of Bakersfield – SCH No. 2025101507 5-28
Cultural Resources
As Alternative 3 would require the same development footprint as the Project and is in the same location as the Project, impacts would be similar. Project Mitigation Measures MM CUL-1 and MM CUL-2, would remain applicable under Alternative 3. Impacts would be the same as the Project.

Energy
Based on the development under Alternative 3, construction-related energy impacts would be similar to or less than the Project. As stated, the less intensive land use types and overall amount of development could result in less construction activity, less construction intensity, and an overall shorter construction duration compared to the Project, so it would result in a decrease in electricity and transportation fuel demands. As discussed in the DEIR, the Project was determined to result in less than significant construction-related energy impacts. Thus, Alternative 3 would also result in less than significant construction-related energy impacts. However, impacts would be less than the Project.

For operation-related energy impacts, the less intensive land use types and overall amount of development under Alternative 3 would result in development of less overall building square footage and generate fewer vehicle trips compared to the Project. Thus, Alternative 3 would result in lower operation-related building energy and transportation fuel demands. Overall, Alternative 3 would result in less than significant operation-related energy impacts and impacts would be less than the Project.

Regarding consistency with the California Renewables Portfolio Standard, Alternative 3 would result in smaller overall building square footage and surface parking lot area than the proposed project, but it would still be required to comply with the applicable PV and battery storage requirements and EV parking standards. Thus, it would still align with the State goal of transitioning to renewable energy. Therefore, and similar to the Project, Alternative 3 would not conflict with the RPS.

Geology and Soils
As Alternative 3 is in the same location as the Project, impacts would be similar. Similar to the Project, mandatory compliance with applicable regulatory requirements and incorporation of the recommendations included in the Geotechnical Investigation would reduce the potential for significant damage to structures resulting from strong seismic ground shaking and the exposure of people or structures to potential substantial adverse effects to less than significant.

Similar to the Project, Alternative 3 is located on relatively flat ground and is not adjacent to any areas with steep slopes that could produce a landslide in the event that ground shaking occurred at the Project Site. Impacts related to seismic-related ground failure including liquefaction, soil erosion, on- or off-site landslides, lateral spreading, subsidence, liquefaction or collapse would be less than significant, and similar to the Project.

As discussed in Section 4.7, Geology and Soils, of this Draft EIR, the Project Site is situated in a highly disturbed environment and there are no unique geologic features located on or around the Project Site. However, because the Project construction would require earthwork and removal of soil, there is potential for the discovery of unknown paleontological resources. Therefore, Project Mitigation Measure MM GEO-1 would remain applicable under Alternative 3. Impacts would be the same as the Project.

Riverview Marketplace Commercial Project
Environmental Impact Report 5.0 Alternatives
City of Bakersfield – SCH No. 2025101507 5-29
Overall, impacts would be similar Project and would be less than significant.

Greenhouse Gas Emissions
Alternative 3 would develop a less intensive uses over a similarly sized Project Site compared to the Project. Thus, based on these characteristics, Alternative 3 could result in less construction activity, less construction intensity, and an overall shorter construction duration, so it would result in lower construction-related GHG emissions.

In addition, the less intensive land use types and smaller overall development amount under Alternative 3 would also be anticipated to result in lower building energy demand, water demand, wastewater generation, solid waste generation, and vehicle trips, which would result in lower overall operation-related GHG emissions compared to the Project. However, because Alternative 3 would still result in GHG emissions and not achieve net zero emissions, it would also have a substantial cumulative contribution to GHG emissions impacts.

In terms of consistency to the CARB Scoping Plan, Alternative 3 would be subject to and be designed to meet the 2025 Building Energy Efficiency Standards and 2025 CALGreen. Thus, it would comply with the PV and EV parking requirements of these two Standards. Therefore, overall, this alternative would not conflict or interfere with implementation of the CARB Scoping Plan.

Regarding consistency with the Kern COG 2022 RTP/SCS, the change in proposed uses from retail and commercial land uses to government office and maintenance use would change the travel demand and generate substantially fewer vehicle trips than the Project. The municipal maintenance and operations yard, under this alternative, would primarily support the delivery of public service operations within the City and would not serve as a destination for commercial and retail activities. The proposed facility’s vehicle trips would primarily consist of employee commute trips and municipal service vehicle trips and would not generate substantial new vehicle travel beyond what is required to serve the existing community. Thus, this alternative would qualify as a local-serving public facility/community institution and would be screened from detailed VMT analysis. Consequently, this alternative would result in less than significant VMT impacts and, unlike the proposed Project, this alternative would be considered consistent with the Kern COG 2022 RTP/SCS. Overall, impacts would be less than the Project but would be significant and unavoidable.

Hazards and Hazardous Materials
As Alternative 3 would require the same development footprint as the Project and is in the same location as the Project, impacts would be similar. Similar to the Project, construction activities required for the Project would involve excavation, grading, and other ground-disturbing activities.

However, continued compliance with laws, regulations, and policies governing the use of these materials would ensure that Alternative 3 implementation would not serve to increase public or environmental exposure to hazardous materials.

Similar to the Project, impacts related to the routine transport, use, and disposal of hazardous materials under Alternative 3 would be less than significant. During both construction and long-term operation, development under Alternative 3 would be required to maintain adequate emergency access for emergency vehicles. Furthermore, compliance with the fire code and local ordinances would ensure that Alternative 3 would not impair an adopted emergency response plan or emergency evacuation plan.

Riverview Marketplace Commercial Project
Environmental Impact Report 5.0 Alternatives
City of Bakersfield – SCH No. 2025101507 5-30
Overall, impacts would be similar under Alternative 3 and would be less than significant.

Hydrology and Water Quality
Similar to the Project, development under Alternative 3 would include site preparation, and other earthwork activities that have the potential to result in erosion on and adjacent to the Project Site.

Similar to the Project, Alternative 3 would be required to comply with the NPDES General Permit for stormwater discharges. Construction activities subject to the General Permit include clearing, grading, stockpiling and excavation. To conform to the requirements of the General Permit, a SWPPP would need to be prepared that specifies Best Management Practices (BMPs) to prevent construction pollutants from moving offsite.

During operation, Alternative 3’s operational urban stormwater discharges are covered under the Central Valley Water Quality Control Board National Pollutant Discharge Elimination System Permit and Waste Discharge Requirements General Permit for Discharges from Municipal Separate Storm Sewer (MS4 Permit). This Alternative would be required to implement a stormwater management framework to ensure that water quality is maintained within the City because of operational stormwater discharges throughout the City, including the Project Site. By complying with regulations, Alternative 3 would not violate any water quality standards or waste discharge requirements. Similar to the Project, Alternative 3 would not result in on-site and off-site erosion and siltation and would not significantly impact local groundwater recharge or impede sustainable groundwater management of the basin.

With compliance with regulations, impacts with regard to flooding or existing drainage pattern of the Project Site would be less than significant and would be similar to the Project. Any impacts regarding water quality standards or waste discharge requirements or groundwater recharge would be less than significant.

Thus, impacts under Alternative 3 would be similar to the Project’s less than significant impacts.

Land Use and Planning
Similar to the Project, construction and operation of the Alternative 3 would be limited to the boundaries of the affected parcel and the identified off-site areas and would not encroach upon the surrounding area. Alternative 3 would not include the development of new obstacles that would divide the existing community. Similar to the Project, Alternative 3 would not physically divide an established community, and no impact would occur.

Under this alternative, it is assumed that the Project Site will be developed in accordance with the current Metropolitan Bakersfield General Plan (MBGP) land use and zoning designations. Thus, Alternative 3 would be developed with a by-right use and no General Plan amendment.

Thus, as Alternative 3 would not require a land use designation change to LI, land use impacts would be less than the Project. Accordingly, impacts under Alternative 3 would be the less than the Project and would be less than significant.

Mineral Resources
The Project Site does not serve as an active mining site, nor is there any mining activity in the Project vicinity. Additionally, all wells located on site have been permanently plugged and abandoned. Similar to the Project, Alternative 3 would not result in the loss of availability of a locally important mineral resource recovery site and there would be less than significant impacts.

Impacts would be the same as the Project.

Riverview Marketplace Commercial Project
Environmental Impact Report 5.0 Alternatives
City of Bakersfield – SCH No. 2025101507 5-31
Noise
Construction Vehicles
Alternative 3 would result in less development intensity due to the reduced square footage of development. However, the Project Site area would remain the same and Alternative 3 would include various roadway improvements that would be implemented along Rosedale Highway and Coffee Road. It is anticipated that the amount and area of grading and other ground disturbing activities under this alternative would be similar to the Project. As such, the maximum number of workers and transport of materials to and from the construction site would remain similar to the Project and would result in incremental increases in noise levels along Rosedale Highway.

Individual construction vehicle pass-bys may create momentary noise levels of up to approximately 85 dBA (Lmax) at 50 feet from the vehicle, but these occurrences would generally be infrequent and short-lived. Because Alternative 3 would require the same level of ground disturbance, similar levels of vendor and haul trips would be required. Similar to the Project, Alternative 3 would have a less than significant impact. Impacts would be less than the Project.

Construction Equipment
Regarding on-site construction, as the overall Project Site area would remain the same as the Project, these construction activities would remain the same distance away from the nearby sensitive receptors as the Project. Therefore, construction noise impacts related to Alternative 3 would be less than significant and less than the Project.

Construction Noise from Off-Site Roadway Improvements
Alternative 3 would include roadway improvements, similar to the Project. As with the Project, construction noise levels due to off-site roadway improvements under Alternative 3 would be below the FTA thresholds. Therefore, off-site roadway improvements construction noise impacts related to Alternative 3 would be less than significant and less than the Project.

Mobile-Source Noise Impacts
Average daily traffic (ADT) would be less under Alternative 3 than the Project. Therefore, traffic noise impacts related to the Existing General Plan/Zoning Alternative would be less than significant and less than the Project.

Stationary-Source Noise Impacts
Based on the reduction in overall development intensity and changes in land uses to office space, a fleet services building, construction equipment, and stockpile storage space, laydown and detention basin, and fueling facility under Alternative 3, this alternative would eliminate several of the highest-noise generating components compared to the Project, including the car wash and drive-through uses.

Unlike the Project, Alternative 3 would not include a commercial car wash facility and would therefore avoid noise associated with vehicle washing operations, vacuum stations, tunnel drying equipment, customer vehicle queuing, and related vehicle movements. Alternative 3 also would not include drive-through operations, eliminating noise generated by vehicle idling, acceleration, deceleration, and customer ordering activities. To the extent minor vehicle washing activities occur as an accessory use, such activities would be intermittent and would not be expected to generate noise levels comparable to those associated with a dedicated commercial car wash Riverview Marketplace Commercial Project
Environmental Impact Report 5.0 Alternatives
City of Bakersfield – SCH No. 2025101507 5-32
facility. Consequently, several of the primary operational noise sources would be eliminated under Alternative 3.

Operational noise under Alternative 3 would primarily be generated by employee and visitor vehicle trips, parking lot activity, loading and unloading operations, fleet vehicle movements, and mechanical equipment such as HVAC systems. Office uses typically generate relatively low levels of operational noise, consisting primarily of vehicle trips during morning and evening commute periods and roof-top shielded HVAC operations. These noise sources are generally less intensive and occur less frequently than the customer oriented activities associated with the Project. The fleet services building would generate operational noise associated with fleet vehicle arrivals and departures and potential maintenance-related activities. Fleet vehicle activity may result in intermittent noise events, including engine start-ups, maneuvering, backup alarms, and truck loading activities. However, these activities would generally occur during normal business hours and would be concentrated within designated operational areas of the Project Site.

Although operational noise would continue to be generated with implementation of Alternative 3 by fleet operations, parking areas, loading activities, and HVAC equipment, the overall intensity and frequency of noise-generating activities would be expected to be lower than the proposed Project. Therefore, operational noise impacts associated with Alternative 3 would be reduced compared to those of the Project and impacts would be less than significant.

Population and Housing
Similar to the Project, future employees of the Project would reside within the City and surrounding area, and commute to work. Therefore, an increased demand for housing to accommodate workers would not occur due to Project operations. Impacts would be less than significant and no mitigation is required.

Alternative 3 would involve similar construction activities as the Project. Operational activities would be related to 100,900 square feet of commercial uses, consisting of office space to accommodate multiple divisions within a public works department (i.e. parks & rec, streets, solid waste). The Project Site would also be developed with industrial uses, including a 128,000 square foot fleet services building, approximately 30 acres of construction, equipment, and stockpile storage space. This Alternative would generate less employees than the Project. Thus, impacts related to inducement of unplanned population growth would be less than significant and less than the Project.

Public Services
Fire Protection and Police Services
The Project’s demand for fire protection and emergency response and police services during construction and operation would be less than significant. Alternative 3 would involve less construction activities and less intensive land uses than the commercial uses associated with the Project. Additionally, operations would typically not occur at night or on the weekends, unlike the Project. As such, Alternative 3 impacts to fire protection and emergency response and policies services would be less than significant and less than the Project.

Parksa
Similar to the Project, Alternative 3 is non-residential, and it is anticipated that future employees of the Project would reside within the City and immediately surrounding area. It is anticipated that future employees would continue to use park facilities near their homes and use of parks or other Riverview Marketplace Commercial Project
Environmental Impact Report 5.0 Alternatives
City of Bakersfield – SCH No. 2025101507 5-33
recreational facilities close to the Project site would be nominal. As such, Alternative 3 impacts to parks would be less than significant and less than the Project.

Schools
Like the Project, Alternative 3 would not generate any new students nor increase demand for school services. Moreover, payment of impact fees in compliance with State law would mitigate any impacts to school facilities. Therefore, impacts to schools as a result of Alternative 3 would be less than significant and less than the Project.

Other
Similar to the Project, Alternative 3 would not result in substantial unplanned population growth, affecting service ratios, response times, or other performance objectives for other services such as libraries. Therefore, impacts to libraries under Alternative 3 would be less than significant and less than the Project.

Recreation
Similar to the Project, Alternative 3 would not increase demand on existing recreational facilities to the degree that new or expanded recreational facilities would be required. Therefore, impacts to recreational facilities under Alternative 3 would be less than significant and less than the Project.

Transportation
Alternative 3 would replace the proposed retail and commercial uses with a municipal maintenance and operations yard. Alternative 3 would function as a maintenance and operations yard which functions as a public service facility that supports municipal operations. The facility would primarily accommodate public works employees, municipal fleet vehicles, equipment storage, and maintenance activities associated with typical local government services.

The primary function of public facilities and community institutions, such as government offices, public libraries, fire stations, police stations, and similar civic facilities is to provide essential public services to the local community and are not typically associated with inducing travel demand or significant increases in VMT.

The proposed municipal maintenance and operations yard is similar in function to other local-serving government facilities since it supports the delivery of public services within the City and does not serve as a destination for commercial and retail activities. It is anticipated that Alternative 3’s facility’s vehicle trips will primarily consist of employee commute trips and municipal service vehicle trips needed to maintain existing public infrastructure and provide municipal services throughout the City. Therefore, the facility is not expected to generate substantial new vehicle travel beyond what is required to serve the existing community and local jurisdiction. As a result, Alternative 3 would qualify as a local-serving public facility/community institution and would be screened from detailed VMT analysis. Therefore, Alternative 3 would result in a less than significant VMT impact. Impacts would be less than the Project.

Development under Alternative 3 would include new bicycle and pedestrian access. Therefore, like the Project, Alternative 3 would not conflict with a program, plan, ordinance, or policy addressing the circulation system, including transit, roadway, bicycle, and pedestrian facilities.

Impacts would be less than significant and similar to the Project.

Riverview Marketplace Commercial Project
Environmental Impact Report 5.0 Alternatives
City of Bakersfield – SCH No. 2025101507 5-34
Similar to the Project, access points and driveways to Alternative 3 would would be reviewed with respect to standard Caltrans sight distance standards at the time of preparation of final grading, landscape, and street improvement plans. Similar to the Project. Alternative 3 would not substantially increase hazards due to a geometric design feature or incompatible land use.

Therefore, impacts would be less than significant and similar to the Project.

Similar to the Project, Alternative 3 would include a Construction Management Plan that would be submitted to the City for review and approval prior to construction. It would identify construction haul routes; construction worker parking and staging areas; construction phasing and scheduling; procedures for on-site loading, unloading, and material storage; temporary traffic control measures. The Construction Management Plan would help to ensure that Alternative 3 would not impact emergency access to the Project Site and surrounding areas during construction.

During operation, similar to the Project, Alternative 3 driveways and internal drive aisles would be constructed pursuant to the City’s design standards and subject to review by KCFD. Furthermore, compliance with the fire code and local ordinances would ensure that Alternative 3 would not impair an adopted emergency response plan. Impacts would be similar to the Project and would be less than significant.

Tribal Cultural Resources
As Alternative 3 would require the same development footprint as the Project and is in the same location as the Project, impacts would be similar. Project Mitigation Measures MM CUL-1 and MM CUL-2, would remain applicable under Alternative 3. Impacts would be the same as the Project.

Utilities and Service Systems
As the amount of development under Alternative 3 would be less than the Project and would involve less water intensive land uses, therefore the demands on utilities would be less than the Project, Alternative 3 will not require the construction of new water, wastewater treatment, stormwater drainage, electric power, natural gas, or telecommunications facilities offsite.

Therefore, impacts associated with both construction and operation of the Alternative 3 would be less than significant.

Similarly, Alternative 3 would have less than significant impacts to water demand and wastewater capacity as the Project and impacts would be less than significant. Similar to the Project, Alternative 3 would not generate solid waste in excess of State and local standards, or in excess of the capacity of local infrastructure, and would comply with CALGreen, State regulations, and City regulations regarding solid waste management. Accordingly, impacts would be less than significant. Overall, impacts related to Alternative 3 would be less than the Project.

Wildfire
Alternative 3 would be located within the same area as the Project and is not located in or near an SRA and does not contain land classified as VHFHSZs. Similar to the Project, no impact would occur with respect to wildfire hazards.

Relationship of the Alternative to Project Objectives
Alternative 3 would consist of a municipal maintenance and storage yard that serves as the central deployment hub for a public works department. The Project Site would not provide as many new employment opportunities as the Project, nor would it develop a new commercial development Riverview Marketplace Commercial Project
Environmental Impact Report 5.0 Alternatives
City of Bakersfield – SCH No. 2025101507 5-35
that would be harmonious with surrounding development that would visually improve the Project Site. Furthermore, Alternative 3 would not provide new commercial uses that would provide new activity and services for residents. Therefore, the future municipal maintenance and storage yard uses on the Project Site would not meet the following Project objectives:
• A Project that allows for the revitalization of the Project Site, adapting to changing market conditions and providing economic benefits to the City. • A Project that encourages and facilitates new uses of high -quality architecture and design.
• A mixture of commercial uses that provides new activity and services to the area and is cohesive with established neighborhoods, businesses, and community amenities nearby.
• New native and drought tolerant. landscaping that visually enhances the Project Site and surrounding perimeter
• A visually harmonious development as viewed both internally and externally.

5.6 Alternatives Considered but Rejected
CEQA Guidelines provide that the lead agency is responsible for selecting a range of project alternatives that are feasible and warrant further consideration. (CEQA Guidelines, §15126.6(a).) Among the factors that may be taken into account when addressing the feasibility of alternatives are site suitability, economic viability, availability of infrastructure, general plan consistency, and whether the proponent can reasonably acquire or gain access to an alternative site. (CEQA Guidelines, §15126.6(f)(1).) Alternatives may be eliminated from consideration in an EIR if they:
(i) fail to meet most of the project objectives; (ii) are infeasible; or (iii) fail to avoid significant environmental impacts. (CEQA Guidelines, §15126.6(c).) Alternatives whose effect cannot be reasonably ascertained and whose implementation is remote and speculative may also be eliminated from consideration. (CEQA Guidelines, §15126.6(f)(3).) The City considered several alternatives to the Project to reduce the impacts to traffic, greenhouse gas emissions, air quality, biological resources, cultural resources, ang geology and soils. The following alternative was initially considered but was eliminated from further consideration because it failed to meet most of the project objectives, was deemed infeasible, and did not reduce any significant impacts.

5.6.1 Alternative Site
Consideration was given to developing the Project, as proposed, on an alternative site within the City of Bakersfield. In considering this alternative, the following challenges were identified:
• The selection of any alternative site would have the same potential significant impacts as the current Project site.
• Due to the Project site’s unique characteristics, finding a comparable infill site of equal size is unlikely.
• An alternative site that is properly zoned and of equal size is not likely to meet the critical project objective of promoting infill development.

Riverview Marketplace Commercial Project
Environmental Impact Report 5.0 Alternatives
City of Bakersfield – SCH No. 2025101507 5-36
• An alternative site of adequate size would likely be outside of an established urban area, resulting in potentially increased impacts to traffic and greenhouse gas emissions. • Neither the City nor the Applicant have ownership control of any alternative sites, rendering this alternative infeasible.

For these reasons, analysis of an alternative site was eliminated from further consideration in the EIR.

5.7 Environmentally Superior Alternative
CEQA Guidelines Section 15126.6(e)(2) indicates that an analysis of alternatives to a proposed project shall identify an environmentally superior alternative among the alternatives evaluated in an EIR and that if the “no project” alternative is the environmentally superior alternative, the EIR shall identify another environmentally superior alternative among the remaining alternatives.

Selection of an environmentally superior alternative is based on comparison of the alternatives to determine which among the alternatives would reduce or eliminate the impacts associated with the Project to the greatest degree. The comparative impacts of the Project and the Project Alternatives are summarized in Table 5-1: Comparison of the Impacts of the Project and Alternatives.

Of the alternatives analyzed in this Draft EIR, Alternative 1 would be considered the environmentally superior alternative because it would not involve new development and assumes that the Project Site would remain vacant under existing conditions. Although Alternative 1 would not meet any of the Project objectives, it would avoid all of the Project’s potentially significant impacts and significant and unavoidable impacts and would have reduced impacts compared to the Project. However, because Alternative 1 has been identified as the environmentally superior alternative, identification of another environmentally superior alternative is required.

Alternative 3, involving development of the Project Site in accordance with current land use and zoning designations, would reduce the Project’s significant and unavoidable VMT impacts and would reduce mitigation measures required for Air Quality. With the exception of Aesthetics impacts, all impacts would be reduced or would be similar to the Project.

However, Alternative 3 would not meet several objectives of the Project as it would not provide a new commercial development that would provide new activities, shopping, and services for residents. Alternative 3 would not generate new employment activities to the same extent as the Project, nor would it develop a new commercial development that would be harmonious with surrounding commercial development. Alternative 3 would not visually improve the Project Site to the same degree as the Project, as new landscaping, high quality commercial architecture, signage and other aesthetic improvements would not occur.

Riverview Marketplace Commercial Project
Environmental Impact Report 5.0 Alternatives
City of Bakersfield – SCH No. 2025101507 5-37
Table 5-1: Comparison of the Impacts of the Project and Alternatives Impact Project Alternative 1:

No Build/No Project
Alternative 2: Reduced
Project Alternative
Alternative 3: Existing
General Plan/Zoning
Alternative
Aesthetics Less than Significant Impact Same — No Impact (Scenic Resource)
Less — No Impact
(Light and Glare)
Greater — No Impact
(Scenic Quality)
Same — Less Than
Significant Impact (Scenic
Resource)
Same — Less Than
Significant Impact (Light and
Glare)
Similar — Less than
Significant Impact (Scenic
Quality)
Same — No Impact (Scenic
Resource)
Same — Less Than
Significant Impact (Light and
Glare)
Greater — Less Than
Significant Impact (Scenic
Quality)
Agricultural and Forestry Resources No Impact Same — No Impact Same — No Impact Same — No Impact Air Quality Less than Significant Impact
with Mitigation
Less — No Impact Less — Less than Significant
Impact with Mitigation
Less — Less than Significant
Impact
Biological Resources Less than Significant Impact
with Mitigation
Less — No Impact Same — Less than Significant
Impact with Mitigation
Same — Less than Significant
Impact with Mitigation
Cultural Resources Less than Significant Impact
with Mitigation
Less — No Impact Same — Less than Significant
Impact with Mitigation
Same — Less than Significant
Impact with Mitigation
Energy Less than Significant Impact Less — No Impact Same — Less than Significant Impact
Less — Less than Significant
Impact
Geology and Soils Less than Significant Impact
(Geology)
Less than Significant Impact
with Mitigation
(Paleontological Resources)
Less — No Impact Same — Less than Significant
Impact (Geology)
Same — Less than Significant
Impact with Mitigation
(Paleontological Resources)
Same — Less than Significant
Impact (Geology)
Same — Less than Significant
Impact with Mitigation
(Paleontological Resources)
Greenhouse Gas Emissions Significant and Unavoidable Less — No Impact Less — Significant and Unavoidable
Less — Significant and
Unavoidable
Hazards and Hazardous Materials Less than Significant Impact Less — No Impact Same — Less than Significant Impact
Same — Less than Significant
Impact
Hydrology and Water Quality Less than Significant Impact Less — No Impact Same — Less than Significant Impact
Same — Less than Significant
Impact
Riverview Marketplace Commercial Project
Environmental Impact Report 5.0 Alternatives
City of Bakersfield – SCH No. 2025101507 5-38
Impact Project Alternative 1:

No Build/No Project
Alternative 2: Reduced
Project Alternative
Alternative 3: Existing
General Plan/Zoning
Alternative
Land Use and Planning Less than Significant Impact Less — No Impact Same — Less than Significant Impact
Less — Less than Significant
Impact
Mineral Resources No Impact Less — No Impact Same — No Impact Same — No Impact Noise Less than Significant Impact Less — No Impact Same — Less than Significant Impact
Less — Less than Significant
Impact
Population and Housing Less than Significant Impact Less — No Impact Same — Less than Significant Impact
Less — Less than Significant
Impact
Public Services and Recreation Less than Significant Impact Less — No Impact Less — Less than Significant Impact
Less — Less than Significant
Impact
Transportation Significant and Unavoidable
(VMT)
Less — No Impact Same — Significant and
Unavoidable
Less — Less than Significant
Impact
Tribal Cultural Resources Less than Significant Impact
with Mitigation
Less — No Impact Same — Less than Significant
Impact with Mitigation
Same — Less than Significant
Impact with Mitigation
Utilities and Service Systems Less than Significant Impact Less — No Impact Less — Less than Significant Impact
Less — Less than Significant
Impact
Wildfire No Impact Less — No Impact Same — No Impact Same — No Impact City of Bakersfield – SCH No. 2025101507 6-1

6. Other CEQA Considerations
This section summarizes the findings of the Draft Environmental Impact Report (EIR) with respect to irreversible environmental changes; significant and unavoidable environmental impacts; potential secondary effects related to Riverview Marketplace Commercial Project (Project) mitigation; growth-inducing impacts; and effects found to be less than significant.

6.1 Significant and Unavoidable Impacts
California Environmental Quality Act (CEQA) Guidelines Section 15126.2(b) requires that an EIR describe significant environmental impacts that cannot be avoided, including those effects that can be mitigated but not reduced to a less than significant level. As determined throughout Chapter 4, Environmental Analysis, of this Draft EIR, the Project’s significant impacts identified for Air Quality, Biological Resources, Cultural Resources, Geology and Soils, and Greenhouse Gas (GHG) Emissions are all addressed through mitigation measures that reduce impacts to less than significant levels. However, significant impacts identified for Transportation and GHG Emissions remain significant and unavoidable, with no mitigation available. Accordingly, the Project would have significant and unavoidable impacts.

6.2 Irreversible Environmental Changes
CEQA Guidelines Section 15126(c) requires an EIR to address any significant irreversible environmental changes that would occur should the proposed Project be implemented. CEQA Guidelines 15126.2(c) states:

Uses of nonrenewable resources during the initial and continued phases of the project may be irreversible since a large commitment of such resources makes removal or nonuse thereafter unlikely. Primary impacts and, particularly, secondary impacts (such as highway improvement, which provides access to a previously inaccessible area) generally commit future generations to similar uses.

Also, irreversible damage can result from environmental accidents associated with the project. Irretrievable commitments of resources should be evaluated to assure that such current consumption is justified.

The Project would necessarily consume limited, slowly renewable, and non-renewable resources.

This consumption would occur during the construction phase of the Project and would continue throughout its operational lifetime. Project development would require a commitment of resources that would include: (1) building materials, (2) fuel and operational materials/resources, and (3) the transportation of goods and people to and from the Project Site. Project construction would require the consumption of resources that are non-replenishable or may renew so slowly as to be considered non-renewable.

Energy resources needed for the construction and operation of the Project would contribute to the incremental depletion of renewable and nonrenewable resources. Resources, such as timber used in building construction, are generally considered renewable and would ultimately be replenished. Nonrenewable resources, such as petrochemical construction materials, steel, copper, lead, and other metals, gravel, concrete, and other materials, are typically considered finite and would not be replenished over the lifetime of the Project. Furthermore, nonrenewable fossil fuels such as gasoline and diesel would also be consumed in the use of construction Riverview Market Commercial Project
Environmental Impact Report 6.0 Other CEQA Considerations City of Bakersfield – SCH No. 2025101507 6-2
vehicles and equipment, as well as the transportation of goods and people to and from the Project Site. As stated in Section 4.6, Energy, of this Draft EIR, Project construction would create temporary increased demands for electricity and vehicle fuels compared to existing conditions and would result in short-term energy use from off-road mobile equipment and on-road vehicles.

Construction of the Project would not require electricity to power most construction equipment.

The majority of construction equipment would be gasoline or diesel-powered. It is anticipated that the majority of electric-powered construction equipment would be hand tools (e.g., power drills, table saws) and lighting, which would result in minimal electricity usage during construction activities. Additionally, it is anticipated that such equipment would be used on an as-needed basis.

Construction equipment would conform to California Air Resources Board (CARB) regulations and California emissions standards. In addition, there are no unusual Project characteristics or construction processes that would require the use of equipment that would be more energy intensive than is used for comparable activities or equipment that would not conform to current emissions standards (and related fuel efficiencies). Transportation energy use during the construction of the Project would come from delivery vehicles, haul trucks, construction employee vehicles, and off-road construction equipment. To limit wasteful and unnecessary energy consumption from transportation, the construction contractors would minimize nonessential idling of construction equipment during construction in accordance with 13 CCR Article 4.8, Chapter 9, Section 2449, which limits nonessential idling of diesel-powered off-road equipment to five minutes. In addition, the Project Site is served by numerous regional freeway systems (e.g., State Routes 99, 58, and 178) that provide the most direct routes from various areas of the region.

Moreover, all construction equipment would cease operating upon completion of the project construction.

Operation of the Project would create additional demands for electricity and natural gas compared to existing conditions and would result in increased transportation energy use. Operational energy use would include heating, cooling, and ventilation of buildings; water heating; operation of electrical systems; use of on-site equipment and appliances; and indoor, outdoor, perimeter, and parking lot lighting. Operation of the Project would consume electricity for various purposes, including but not limited to cooling and ventilation of buildings; operation of electrical systems; lighting; and use of on-site equipment and appliances. Electrical service to the Project would be provided by PG&E through connections to existing off-site electrical lines and new on-site infrastructure. While the Project would result in electricity demand, it would be designed and built to meet the current Building Energy Efficiency Standards and CALGreen, which would contribute to increasing energy efficiency. In accordance with the 2025 Building Energy Efficiency Standards, the Project would install rooftop solar photovoltaic (PV) systems and battery storage systems. Thus, electricity use from the operation of the Project would not be considered inefficient, wasteful, or unnecessary.

The Project would generate demand for natural gas due to the heating and cooling for the building and for water. However, the Project would be built to meet the current Building Energy Efficiency Standards and CALGreen, which would contribute to optimizing energy efficiency of the proposed buildings. For example, building insulation requirements would contribute to minimizing use of natural gas for heating. Thus, overall, the Project would not result in wasteful or unnecessary natural gas demands.

The Project would consume long-term transportation-related energy during operations from the use of motor vehicles. Project-related vehicle trips would primarily be generated from customers and employees. Additional vehicle trips to the Project Site would include deliveries, waste pick up, and maintenance trips. However, as discussed in Section 3.6, Energy, of this Draft EIR, it is Riverview Market Commercial Project
Environmental Impact Report 6.0 Other CEQA Considerations City of Bakersfield – SCH No. 2025101507 6-3
expected that operation-related fuel usage associated with the Project would not be considered inefficient, wasteful, or unnecessary.

The Project would not affect access to existing resources, nor would it interfere with the production or delivery of such resources. The Project Site is currently undeveloped and contains no known energy resources that would be precluded from future use through Project implementation. Based on the above, the Project’s irreversible change to the environment related to the consumption of nonrenewable resources would be less than significant.

6.3 Growth-Inducing Impacts
CEQA Guidelines Section 15126.2(d) requires an EIR to discuss the ways a Project could foster economic or population growth or the construction of additional housing, directly or indirectly, in the surrounding environment. Growth-inducing impacts include the removal of obstacles to population growth (e.g., the expansion of a wastewater treatment plant allowing more development in a service area) and the development and construction of new service facilities that could significantly affect the environment individually or cumulatively. In addition, pursuant to CEQA, growth must not be assumed as beneficial, detrimental, or of little significance to the environment.

The Project Site is located in the northwestern portion of the City. The Project Site is an approximately 46.16-acre undeveloped L-shaped property situated along the south side of Rosedale Highway, north of the railroad tracks, west of Coffee Road, and east of El Toro Viejo Road. The Project Site is located on a portion of a larger property formerly occupied by the PG&E Kern Power Plant. There is no existing housing on the Project Site. The Project proposes to transform an underutilized site into an active infill commercial center that would create economic, retail and service opportunities in an area served with existing infrastructure and public services.

The Project Site is surrounded by existing commercial uses to the north, west, and east.

As discussed in Section 4.14, Population and Housing, of this Draft EIR, the Project proposes the development of a commercial retail center and does not include a residential component that would result in residents and population within the City. As such, the Project would not directly induce population growth.

The Project would not include components such as the extension of roads or existing infrastructure that would result in the indirect population growth within the City. It is anticipated that construction workers and future employees of the Project would reside within the City and surrounding area, and commute to work. Although the operation of the Project would provide employment opportunities in the local area, the Project would not require a specialized labor force that would draw large numbers of new employees to the area. Based on the existing unemployment rates in the City and County, any new employees would already be located within the City limits and would not relocate to the Bakersfield area specifically to obtain jobs associated with the Project. Therefore, the Project would not induce substantial unplanned population growth and would not eliminate impediments to growth. Consequently, the Project would not foster growth inducing impacts.

Riverview Market Commercial Project
Environmental Impact Report 6.0 Other CEQA Considerations City of Bakersfield – SCH No. 2025101507 6-4
This page intentionally left blank.

City of Bakersfield – SCH No. 2025101507 7-1

7. References
American Ornithologists’ Union. The A.O.U. Check-List of North American Birds. 6th ed., Allen Press, 1983. Supplements published 1985, 1987, 1989, 1991, 1993, and 1995.

AirNav, LLC. Airport Information. 2023, http://www.airnav.com/airports.

American Society of Civil Engineers. Minimum Design Loads and Associated Criteria for Buildings and Other Structures: Supplement 1. ASCE/SEI 7-16, effective 12 Dec. 2018.

American Society of Civil Engineers. Minimum Design Loads and Associated Criteria for Buildings and Other Structures: Supplement 3. ASCE/SEI 7-16, effective 5 Nov. 2021.

Bailey, Richard C. Heart of the Golden Empire: An Illustrated History of Bakersfield. Windsor Publications, 1984.

Bay Area Air Quality Management District. 2022 California Environmental Quality Act Air Quality Guidelines. Apr. 2023, www.baaqmd.gov/plans-and-climate/california-environmental-quality-act-ceqa/updated-ceqa-guidelines.

Bean, Lowell John, and Charles R. Smith. “California.” Handbook of North American Indians, edited by Robert F. Heizer, vol. 8, Smithsonian Institution, 1978.

Beyard, Michael D., et al. Shopping Center Development Handbook. 3rd ed., Urban Land Institute, 1999, p. 46.

Binford, Lewis R. “Willow Smoke and Dog’s Tails: Hunter-Gatherer Settlement Systems and Archaeological Site Formation.” American Antiquity, vol. 45, no. 1, 1980, pp. 4–20.

Burt, William H., and Richard P. Grossenheider. Peterson Field Guides: Mammals. Houghton Mifflin, 1980.

California Air Resources Board. 2004 Revision to the California State Implementation Plan for Carbon Monoxide: Updated Maintenance Plan for Ten Federal Planning Areas. 22 July 2004, ww3.arb.ca.gov/planning/sip/co/final_2004_co_plan_update.pdf.

California Air Resources Board. 2022 Scoping Plan for Achieving Carbon Neutrality. 16 Nov. 2022, ww2.arb.ca.gov/sites/default/files/2022-12/2022-sp.pdf.

California Air Resources Board. Air Pollution Data Monitoring Cards (2020, 2021, 2022, 2023, and 2024). www.arb.ca.gov/adam/topfour/topfour1.php.

Riverview Marketplace Commercial Project
Environmental Impact Report References
City of Bakersfield – SCH No. 2025101507 7-2
California Air Resources Board. Air Quality and Land Use Handbook: A Community Health Perspective. Apr. 2005, www.aqmd.gov/docs/default-source/ceqa/handbook/california-air-resources-board-airquality-and-land-use-handbook-a-community-health-perspective.pdf.

California Air Resources Board. Ambient Air Quality Standards. 16 July 2024, ww2.arb.ca.gov/sites/default/files/2024-
08/AAQS%20Table_ADA_FINAL_07222024.pdf.

California Air Resources Board. California Greenhouse Gas Emissions from 2000–2023:

Trends of Emissions and Other Indicators Report. 4 Nov. 2025, ww2.arb.ca.gov/sites/default/files/2025-11/nc-2000_2023_ghg_inventory_trends.pdf.

California Air Resources Board. California’s Advanced Clean Cars Midterm Review. 18 Jan. 2017, ww2.arb.ca.gov/sites/default/files/2020-01/ACC%20MTR%20Summary_Ac.pdf.

California Air Resources Board. Common Air Pollutants. ww2.arb.ca.gov/resources/common-air-pollutants.

California Air Resources Board. Final Staff Report: Update to the Toxic Air Contaminant List. 1999.

California Air Resources Board. Maps of State and Federal Area Designations. ww2.arb.ca.gov/resources/documents/maps-state-and-federal-area-designations.

California Air Resources Board. Proposed Update to the SB 375 Greenhouse Gas Emission Reduction Targets. Feb. 2018, ww2.arb.ca.gov/sites/default/files/2020- 06/SB375_Updated_Final_Target_Staff_Report_2018.pdf.

California Air Resources Board. SB 375 Regional Targets. ww2.arb.ca.gov/ourwork/programs/sustainable-communities-program/sb-375-regional-targets.

California Air Resources Board. Short-Lived Climate Pollutant Reduction Strategy. Mar. 2017, www.arb.ca.gov/cc/shortlived/shortlived.htm.

California Air Resources Board. The Report on Diesel Exhaust. 22 Apr. 1998, www.arb.ca.gov/toxics/dieseltac/de-fnds.htm.

California Climate Action Team. Climate Action Team Report to Governor Schwarzenegger and the Legislature. Mar. 2006.

California Climate Change Center. Our Changing Climate 2012: Vulnerability and Adaptation to the Increasing Risks from Climate Change in California. July 2012.

Riverview Marketplace Commercial Project
Environmental Impact Report References
City of Bakersfield – SCH No. 2025101507 7-3
California Department of Conservation, Geologic Energy Management Division. “Well Finder.” 2025, https://www.conservation.ca.gov/calgem/Pages/WellFinder.aspx.

California Department of Fish and Game. California’s Wildlife, Volume I: Amphibians and Reptiles. State of California Resources Agency, 1988.

California Department of Fish and Game. California’s Wildlife, Volume II: Birds. State of California Resources Agency, 1988.

California Department of Fish and Game. California’s Wildlife, Volume III: Mammals. State of California Resources Agency, 1988.

California Department of Fish and Game. Endangered and Threatened Animals List. Natural Diversity Data Base, The Resources Agency of California, Oct. 2014.

California Department of Fish and Game. Endangered, Threatened, and Rare Plants. Natural Diversity Data Base, The Resources Agency of California, Oct. 2014.

California Department of Fish and Game. Natural Communities List. Natural Diversity Data Base, The Resources Agency of California, Oct. 2014.

California Department of Fish and Game. RareFind Online Program: Database Record Search for Information on Threatened, Endangered, Rare, or Otherwise Sensitive Species.

State of California Resources Agency, 2015.

California Department of Fish and Game. Special Animals List. Natural Diversity Data Base, The Resources Agency of California, Oct. 2014.

California Department of Fish and Wildlife. California Laws Protecting Native Plants: California Native Plant Protection Act. 2026, wildlife.ca.gov/Conservation/Plants/Laws.

California Department of Fish and Wildlife. CNDDB MGS Data: The Conservation Strategy for the Mohave Ground Squirrel. Natural Diversity Data Base, The Resources Agency of California, 2018.

California Department of Toxic Substances Control. “EnviroStor.” 2025, https://www.envirostor.dtsc.ca.gov/public/.

California Department of Transportation. Technical Noise Supplement (“TeNS”). Sept. 2013, prepared by ICF International,
http://www.dot.ca.gov/hq/env/noise/pub/TeNS_Sept_2013B.pdf.

Riverview Marketplace Commercial Project
Environmental Impact Report References
City of Bakersfield – SCH No. 2025101507 7-4
California Department of Transportation. Transportation and Construction Vibration Guidance Manual. Apr. 2020, prepared by ICF International,
https://dot.ca.gov/programs/environmental-analysis/noise-vibration/guidance-manuals.

California Department of Water Resources. Water Data Library Station Map: Wells 29S27E28C001M, 29S27E29K001M, 29S27E29C001M, and 29S27E20Q001M. Nov. 2024, wdl.water.ca.gov/waterdatalibrary/Map.aspx.

California Energy Commission. 2024 California Annual Retail Fuel Outlet Report Results (CEC-A15). www.energy.ca.gov/data-reports/energy-almanac/transportation-energy/california-retailfuel-outlet-annual-reporting.

California Energy Commission. Amendments to the Building Energy Efficiency Standards (2022 Energy Code): Draft Environmental Report. 19 May 2021, CEC-400-2021-077-D.

California Energy Commission. Annual Oil Supply Sources to California Refineries. www.energy.ca.gov/data-reports/energy-almanac/californias-petroleum-market/annual-oilsupply-sources-california.

California Energy Commission. Electricity Consumption.
www.energy.ca.gov/datareports/energy-almanac/california-electricity-data/california-energy-consumption-dashboards-0.

California Energy Commission. Foreign Sources of Crude Oil Imports to California. www.energy.ca.gov/data-reports/energy-almanac/californias-petroleum-market/foreignsources-crude-oil-imports.

California Energy Commission. Natural Gas Consumption.
www.energy.ca.gov/datareports/energy-almanac/california-electricity-data/california-energy-consumption-dashboards-1.

California Energy Commission. Our Changing Climate: Assessing the Risks to California.

California Climate Change Center, 2006, CEC-500-2006-077.

California Energy Commission. The Future Is Now: An Update on Climate Change Science, Impacts, and Response Options for California. May 2009, CEC-500-2008-0077.

California Geological Survey. Guidelines for Evaluating and Mitigating Seismic Hazards in California. Special Publication 117A, 2008.

California Native Plant Society. California Rare Plant Ranks. 2026, www.cnps.org/rare-plants/california-rare-plant-ranks.

Riverview Marketplace Commercial Project
Environmental Impact Report References
City of Bakersfield – SCH No. 2025101507 7-5
California Natural Resources Agency. Safeguarding California: Reducing Climate Risk: An Update to the 2009 California Climate Adaptation Strategy. July 2014.

California Office of Emergency Services. California Adaptation Planning Guide. June 2020, www.caloes.ca.gov/HazardMitigationSite/Documents/CA-Adaptation-Planning-Guide-FINAL-June-2020-Accessible.pdf.

California Office of Statewide Health Planning and Development. Seismic Design Maps Website. seismicmaps.org.

California Public Resources Code, Section 5024.1(b).

California Public Utilities Commission. 2021 Padilla Report: Costs and Savings for the RPS Program (Public Utilities Code Section 913.3). May 2021, www.cpuc.ca.gov/- /media/cpuc-website/industries-and-topics/documents/energy/rps/2021-padilla-report_final.pdf.

California Public Resources Code, Section 21083.1(a).

California Public Resources Code, Section 5024.1(a).

California State Water Resources Control Board. “California PFAS Investigations.” 2025, https://www.waterboards.ca.gov/pfas/.

California State Water Resources Control Board. “GeoTracker PFAS Map.” 2025, https://geotracker.waterboards.ca.gov/map/pfas_map.

California State Water Resources Control Board. “GeoTracker.” 2025, https://geotracker.waterboards.ca.gov/.

City of Bakersfield. 2020 Urban Water Management Plan. Dec. 2021, www.calwater.com/docs/uwmp2020/BK_2020_UWMP_FINAL.pdf.

City of Bakersfield. Bakersfield Register of Historic Places. content.civicplus.com/api/assets/ee46706a-491d-4252-a2f2-b42a3f33988d.

City of Bakersfield. October 2022. City of Bakersfield Municipal Code. https://bakersfield.municipal.codes/Code/9.22.

City of Bakersfield. December 2002. General Plan Noise Element. https://content.civicplus.com/api/assets/37a2e20d-e610-431f-a222-9f4f2ecd2ddd.

City of Bakersfield. Historic Preservation. 2026, www.bakersfieldcity.us/256/Historic-Preservation.

Riverview Marketplace Commercial Project
Environmental Impact Report References
City of Bakersfield – SCH No. 2025101507 7-6
City of Bakersfield. Metropolitan Bakersfield General Plan: Circulation Element. 2002, p. III-4.

City of Bakersfield. Metropolitan Bakersfield Habitat Conservation Plan: Summary. 1994, docs.bakersfieldcity.us/weblink/0/edoc/625001/Metropolitan%20Bakersfield%20Habitat %20Conservation%20Plan.pdf.

City of Bakersfield. Standards and Specifications for Domestic Water Systems. 30 Sept. 2022, content.civicplus.com/api/assets/9b56b19c-bf08-40a8-bce4- 9c3158739407?cache=1800.

Code of Federal Regulations, title 36 (CFR) § 60.

Cogswell, Howard L. Water Birds of California. University of California Press, 1977.

Department of the Army. “33 CFR Parts 320 through 330, Regulatory Programs of the Corps of Engineers; Final Rule.” Federal Register, vol. 51, no. 219, 13 Nov. 1986, pp. 41206– 41206.

Department of the Army. “33 CFR Parts 320 through 330, Regulatory Programs of the Corps of Engineers; Final Rule.” Federal Register, vol. 65, no. 47, 9 Mar. 2000, pp. 12818– 12899.

Department of the Army. “33 CFR Parts 320 through 330, Regulatory Programs of the Corps of Engineers; Final Rule.” Federal Register, vol. 67, no. 10, 15 Jan. 2002, pp. 20020– 2095.

Environmental Risk Information Services. Aerial Photographs. 7 July 2025.

Environmental Risk Information Services. City Directory Report. 7 July 2025.

Environmental Risk Information Services. Fire Insurance Map Report. 2 July 2025.

Environmental Risk Information Services. Radius Map Report. 2 July 2025.

Environmental Risk Information Services. Topographic Maps. 2 July 2025.

Federal Highway Administration. Roadway Construction Noise Model (RCNM), Version 1.1. 2006, https://www.fhwa.dot.gov/Environment/noise/construction_noise/rcnm/.

Federal Transit Administration. Transit Noise and Vibration Impact Assessment Manual. Sept. 2018, US Department of Transportation.

General Technologies and Solutions. Vehicle Miles Traveled (VMT) Analysis: Riverview Market Commercial Development, City of Bakersfield, CA. 22 Dec. 2025.

Riverview Marketplace Commercial Project
Environmental Impact Report References
City of Bakersfield – SCH No. 2025101507 7-7
Governor’s Office of Land Use and Climate Innovation. CEQA and Climate Change:

Addressing Climate Change through CEQA Review. Technical Advisory, June 2008, opr.ca.gov/docs/june08-ceqa.pdf.

Governor’s Office of Land Use and Climate Innovation. State of California Tribal Consultation Guidelines: Supplement to General Plan Guidelines. 2014, nahc.ca.gov/wp-content/uploads/2019/04/SB-18-Tribal-Consultation-Guidelines.pdf.

Hickman, James C., editor. The Jepson Manual: Higher Plants of California. University of California Press, 1993.

Historic Aerials. Aerial Photography from the Past and Present. National Environmental Title Research, LLC, www.historicaerials.com.

Holland, Robert F. Preliminary Descriptions of the Terrestrial Natural Communities of California. Non-game Heritage Program, California Department of Fish and Game, 1986. Updated 1996.

Institute of Transportation Engineers. Trip Generation Manual. 12th ed., 2025.

Integrated Engineering Group. Rosedale & Coffee Commercial and Retail Project Traffic Assessment. 2022.

Integrated Engineering Group. Riverview Market Transportation Analysis. Jan. 2026.

Intergovernmental Panel on Climate Change. Climate Change 2001: The Third Assessment Report. Cambridge UP, 2001.

Intergovernmental Panel on Climate Change. Climate Change 2007: The Fourth Assessment Report. Cambridge UP, 2007.

Intergovernmental Panel on Climate Change. Climate Change 2013: The Fifth Assessment Report. Cambridge UP, 2013.

Intergovernmental Panel on Climate Change. Climate Change 2022: Sixth Assessment Report. Cambridge UP, 2023, www.ipcc.ch/assessment-report/ar6/.

International Energy Agency. Energy Efficiency Requirements in Building Codes: Energy Efficiency Policies for New Buildings. Mar. 2008.

JHK & Associates. Highway Traffic Data for Urbanized Area Project Planning and Design.

National Research Council, 2000, ajhassoc.com/wp-content/uploads/2017/01/Report255.pdf.

Riverview Marketplace Commercial Project
Environmental Impact Report References
City of Bakersfield – SCH No. 2025101507 7-8
Kern Council of Governments. 2022 Regional Transportation Plan/Sustainable Communities Strategy. 2022, www.kerncog.org/wp-content/uploads/2022/12/2022_RTP.pdf.

Kern County Subbasin Groundwater Sustainability Agencies. Kern County Subbasin Groundwater Sustainability Plan. Dec. 2024, kerngsp.com/wp-content/uploads/2024/12/Kern-Subbasin-2024-Groundwater-Sustainability-Plan.pdf.

Kimley-Horn. Rosedale & Coffee Rd–Riverview Market, Southwest Corner of Rosedale and Coffee Rd, Bakersfield, CA, Sewer Area Study. 5 Nov. 2025.

Kroeber, Alfred L. Handbook of the Indians of California. Smithsonian Institution, 1925. Dover Publications, 1976.

Leighton Consulting, Inc. Phase I Environmental Site Assessment – Former Pacific Gas & Electric Power Plant, Southwest of the Intersection of Rosedale Highway and Coffee Road, Bakersfield, California 93308. Apr. 2022.

Leighton Consulting, Inc. Subsurface Environmental Site Assessment – Oil Well Production Areas, Approximately 48-Acre Commercial Development Site, Southwest of Intersection of Rosedale Highway and Coffee Road, Bakersfield, California 93308. Mar. 2023.

Moyle, Peter B. Inland Fishes of California. University of California Press, 1976.

Munz, Philip A. A Flora of Southern California. University of California Press, 1974.

National Highway Traffic Safety Administration. Corporate Average Fuel Economy: NHTSA Announces New Proposal for CAFE and HDPUV Standards. 7 June 2024, www.nhtsa.gov/laws-regulations/corporate-average-fuel-economy.

National Highway Traffic Safety Administration. President Trump and Transportation Secretary Sean P. Duffy Unveil New “Freedom Means Affordable Cars” Initiative to Reset Fuel Economy Standards. 3 Dec. 2025, www.transportation.gov/briefing-room/president-trump-transportation-secretary-sean-pduffy-unveil-new-freedom-means.

National Highway Traffic Safety Administration. Resetting the Corporate Average Fuel Economy Program. Docket No. NHTSA-2025-0055, 11 June 2025, www.federalregister.gov/documents/2025/06/11/2025-10586/resetting-thecorporate-average-fuel-economy-program.

National Highway Traffic Safety Administration. USDOT Announces New Vehicle Fuel Economy Standards for Model Year 2024–2026. 1 Apr. 2022, www.nhtsa.gov/press-releases/usdot-announces-new-vehicle-fuel-economy-standards-model-year-2024- 2026.

Riverview Marketplace Commercial Project
Environmental Impact Report References
City of Bakersfield – SCH No. 2025101507 7-9
Office of Environmental Health Hazard Assessment. Air Toxics Hot Spots Program Risk Assessment Guidelines: Guidance Manual for Preparation of Health Risk Assessments. Feb. 2015, oehha.ca.gov/air/hot_spots/2015/2015GuidanceManual.pdf.

Office of Environmental Health Hazard Assessment. Indicators of Climate Change in California. May 2018, oehha.ca.gov/media/downloads/climate-change/report/2018caindicatorsreportmay2018.pdf.

Osborne, Richard H. “An Ethnographic Overview of the Southern Valley Yokuts.” Kern County Archaeological Society Journal, vol. 3, 1992, pp. 36–65.

Pacific Gas and Electric Company. 2024 Power Content Label: Pacific Gas and Electric Company. 2026, www.pge.com/assets/pge/docs/about/corporate-responsibility-and-sustainability/2024-pclpacific-gas-and-electric-company.pdf.

Pacific Gas and Electric Company. Company Profile. www.pge.com/en_US/about-pge/company-information/profile/profile.page.

Preston, William L. Vanishing Landscapes. University of California Press, 1981.

San Francisco Bay Regional Water Quality Control Board. Environmental Screening Levels.

July 2025.

San Joaquin Valley Air Pollution Control District. 2007 Ozone Plan. 30 Apr. 2007.

San Joaquin Valley Air Pollution Control District. 2007 PM10 Maintenance Plan and Request for Redesignation. 20 Sept. 2007,
www.valleyair.org/media/xmxlzxff/pm10maintenanceplan209-07.pdf.

San Joaquin Valley Air Pollution Control District. 2008 PM2.5 Plan. www.valleyair.org/rules-and-planning/air-quality-plans/particulate-matterplans/2008-pm25-plan/.

San Joaquin Valley Air Pollution Control District. 2009 Reasonably Available Control Technology (RACT) Demonstration for the 8-Hour Ozone State Implementation Plan (SIP). 16 Apr. 2009, www.valleyair.org/media/npmhpexf/ractsip-2009.pdf.

San Joaquin Valley Air Pollution Control District. 2012 PM2.5 Plan. 20 Dec. 2012, www.valleyair.org/media/b2jho5kt/completedplanbookmarked.pdf.

San Joaquin Valley Air Pollution Control District. 2013 Plan for the Revoked 1-Hour Ozone Standard. 19 Sept. 2013, ww2.valleyair.org/media/uwqfm4yq/adoptedplan.pdf.

Riverview Marketplace Commercial Project
Environmental Impact Report References
City of Bakersfield – SCH No. 2025101507 7-10
San Joaquin Valley Air Pollution Control District. 2014 Reasonably Available Control Technology (RACT) Demonstration for the 8-Hour Ozone State Implementation Plan (SIP). 19 June 2014, www.valleyair.org/media/42znjsez/2014-ract-sip.pdf.

San Joaquin Valley Air Pollution Control District. 2015 Plan for the 1997 PM2.5 Standard. 16 Apr. 2015, www.valleyair.org/media/ipxjiz3r/2015-pm25-plan_bookmarked.pdf.

San Joaquin Valley Air Pollution Control District. 2016 Moderate Area Plan for the 2012 PM2.5 Standard. 15 Sept. 2016, www.valleyair.org/media/ascouxxn/2016-plan.pdf.

San Joaquin Valley Air Pollution Control District. 2016 Ozone Plan for 2008 8-Hour Ozone Standard. 16 June 2016, www.valleyair.org/media/ed2f1tdd/adopted-plan.pdf.

San Joaquin Valley Air Pollution Control District. 2018 Plan for the 1997, 2006, and 2012 PM2.5 Standards. 15 Nov. 2018, archive.valleyair.org/pmplans/documents/2018/pm-plan-adopted/2018-Plan-for-the-1997-2006-and-2012-PM2.5-Standards.pdf.

San Joaquin Valley Air Pollution Control District. Air Quality Attainment Plans. valleyair.org/Air_Quality_Plans/air-quality-plans.htm.

San Joaquin Valley Air Pollution Control District. Ambient Air Quality Standards & Valley Attainment Status. www.valleyair.org/aqinfo/attainment.htm.

San Joaquin Valley Air Pollution Control District. Climate Change Action Plan: Final Staff Report: Addressing Greenhouse Gas Emissions Impacts under the California Environmental Quality Act. 17 Dec. 2009, ww2.valleyair.org/media/mdfm0lsd/1-ccap-final-ceqa-ghg-staff-report-dec-17-2009.pdf.

San Joaquin Valley Air Pollution Control District. District Policy APR 1925: Policy for District Rule 2201 AAQA Modeling. Rev. 6 May 2024, www.valleyair.org/media/341fy4sn/apr-1925-rule-2201-aaqa-modeling-may-2024.pdf.

San Joaquin Valley Air Pollution Control District. Frequently Asked Questions. www.valleyair.org/about/frequently-asked-questions/.

San Joaquin Valley Air Pollution Control District. Guidance for Assessing and Mitigating Air Quality Impacts. 19 Mar. 2015, www.valleyair.org/media/g4nl3p0g/gamaqi.pdf.

San Joaquin Valley Air Pollution Control District. Guidance for Valley Land-Use Agencies in Addressing GHG Emissions for New Projects. 17 Dec. 2009, www.valleyair.org/media/dnsnicdv/3-ccap-final-lu-guidance-dec-17-2009.pdf.

Sawyer, John O., and Todd Keeler-Wolf. A Manual of California Vegetation. California Native Plant Society, 1995.

Riverview Marketplace Commercial Project
Environmental Impact Report References
City of Bakersfield – SCH No. 2025101507 7-11
South Coast Air Quality Management District. 2012 Final Air Quality Management Plan. Feb. 2013, www.aqmd.gov/home/airquality/air-quality-management-plans/air-quality-mgt-plan/final-2012-air-quality-management-plan.

South Coast Air Quality Management District. Federal Attainment Plan for Carbon Monoxide. 1992.

South Coast Air Quality Management District. Final 2003 Air Quality Management Plan. 2003, www.aqmd.gov/home/air-quality/clean-air-plans/air-quality-mgt-plan/2003-aqmp.

South Coast Air Quality Management District. Guidance Document for Addressing Air Quality Issues in General Plans and Local Planning. May 2005, www.aqmd.gov/docs/default-source/planning/air-quality-guidance/complete-guidance-document.pdf.

Spencer, Wayne D., et al. California Essential Habitat Connectivity Project: A Strategy for Conserving a Connected California. Prepared for California Department of Transportation, California Department of Fish and Game, and Federal Highway Administration, 2010.

State CEQA Guidelines, Section 15064.5(b)(1).

State CEQA Guidelines, 15064.5(b)(3).

State CEQA Statute and Guidelines, Section 15064.5(c)(4).

Stebbins, Robert C. A Field Guide to Western Reptiles and Amphibians. 2nd ed., Houghton Mifflin, 2003.

Thomas, David H. The Archaeology of Monitor Valley I: Epistemology. American Museum of Natural History, 1983. Anthropological Papers of the American Museum of Natural History, vol. 58, no. 1.

Tibor, David P., editor. California Native Plant Society’s Inventory of Rare and Endangered Plants of California. 6th ed., special publication no. 1, California Native Plant Society, 2001.

Transportation Research Board. Highway Capacity Manual. 7th ed., National Academies of Sciences, Engineering, and Medicine, 2022.

Twisselmann, Ernest C. A Flora of Kern County, California. University of San Francisco Press, 1967.

U.S. Energy Information Administration. Petroleum & Other Liquids: Crude Oil Production. www.eia.gov/dnav/pet/pet_crd_crpdn_adc_mbbl_a.htm.

Riverview Marketplace Commercial Project
Environmental Impact Report References
City of Bakersfield – SCH No. 2025101507 7-12
U.S. Environmental Protection Agency. Criteria Air Pollutants. www.epa.gov/criteria-air-pollutants.

U.S. Environmental Protection Agency. Endangerment and Cause or Contribute Findings for Greenhouse Gases under Section 202(a) of the Clean Air Act. Updated 27 Feb. 2025, www.epa.gov/climatechange/endangerment-and-cause-or-contribute-findings-greenhouse-gases-under-section-202a.

U.S. Environmental Protection Agency. EPA Releases Proposal to Rescind Obama-Era Endangerment Finding, Regulations That Paved the Way for Electric Vehicle Mandates. 29 July 2025, www.epa.gov/newsreleases/epa-releases-proposal-rescind-obama-era-endangerment-findingregulations-paved-way.

U.S. Environmental Protection Agency. EPA: Greenhouse Gases Threaten Public Health and the Environment. Dec. 2009,
archive.epa.gov/epapages/newsroom_archive/newsreleases/08d11a451131bca585257 685005bf252.html.

U.S. Environmental Protection Agency. Final Rule: Multi-Pollutant Emissions Standards for Model Years 2027 and Later Light-Duty and Medium-Duty Vehicles. 12 Mar. 2025, www.epa.gov/regulations-emissions-vehicles-andengines/final-rule-multi-pollutant-emissions-standardsmodel.

U.S. Environmental Protection Agency. Health and Environmental Effects of Hazardous Air Pollutants. www.epa.gov/haps/health-and-environmental-effects-hazardous-air-pollutants.

U.S. Environmental Protection Agency. Health Assessment Document for Diesel Engine Exhaust. National Center for Environmental Assessment, May 2002, EPA/600/8- 90/057F.

U.S. Environmental Protection Agency. Summary of the Energy Independence and Security Act. Updated 28 May 2025, www.epa.gov/laws-regulations/summary-energy-independence-and-security-act.

U.S. Fish and Wildlife Service. “Endangered or Threatened Wildlife and Plants.” Federal Register, 31 Oct. 1997, 50 CFR Part 17.

U.S. Fish and Wildlife Service. “Endangered or Threatened Wildlife and Plants; Animal Candidate Review for Listing as Endangered or Threatened Species.” Federal Register, 15 Nov. 1994, 50 CFR Part 17.

U.S. Fish and Wildlife Service. “Plant Taxa for Listing as Endangered or Threatened Species; Notice of Review.” Federal Register, 30 Sept. 1993, 50 CFR Part 17.

Riverview Marketplace Commercial Project
Environmental Impact Report References
City of Bakersfield – SCH No. 2025101507 7-13
U.S. Fish and Wildlife Service. Draft Revised Recovery Plan for the Mojave Population of the Desert Tortoise (Gopherus agassizii). California and Nevada Region, 2008.

Udvardy, Miklos D. F. National Audubon Society Field Guide to North American Birds. Alfred A.

Knopf, 1994.

United States Department of the Interior, National Park Service, Native American Graves Protection And Repatriation Act, 1990.

United States Department of the Interior, National Park Service. Technical Brief #20:

Archeological Damage Assessment: Legal Basis and Methods. 2007.

United States Department of the Interior, National Park Service. National Register Bulletin 15:

How to Apply the National Register Criteria for Evaluation. 1997, www.nps.gov/subjects/nationalregister/upload/NRB-15_web508.pdf. p. 8.

United States Department of the Interior, National Park Service. What Is the National Register of Historic Places? National Park Service, www.nps.gov/subjects/nationalregister/what-is-the-national-register.htm.

United States Department of Transportation. “National Pipeline Mapping System (NPMS) Public Map Viewer.” Pipeline and Hazardous Materials Safety Administration, 2025, https://www.npms.phmsa.dot.gov/PublicViewer/.

United States Environmental Protection Agency. “Drinking Water Health Advisories for PFOA and PFOS.” 2025, https://www.epa.gov/sdwa/drinking-water-health-advisories-pfoaand-pfos.

United States Geological Survey. Earthquake Ground Motion Parameters Application. earthquake.usgs.gov/research/hazmaps/design.

United States Geological Survey. Oildale, California. 7.5-minute topographic quadrangle map, 1968.

Wallace, William J. “The Southern Valley Yokuts, and the Northern Valley Yokuts.” Handbook of North American Indians, edited by William L. d’Azevedo, vol. 8, Smithsonian Institution, 1978, pp. 448–470.

Western Regional Climate Center. Period of Record Monthly Climate Summary, 10/01/1937 to 06/09/2016: Bakersfield AP, California (Station ID #040442). Western US Climate Summaries, wrcc.dri.edu/cgi-bin/cliMAIN.pl?ca0442.

White House. Unleashing American Energy. 20 Jan. 2025,
www.whitehouse.gov/presidentialactions/2025/01/unleashing-american-energy/.

Riverview Marketplace Commercial Project
Environmental Impact Report References
City of Bakersfield – SCH No. 2025101507 7-14
Williams, Patricia, Leah Messinger, and Sarah Johnson. Habitats Alive! An Ecological Guide to California’s Diverse Habitats. California Institute for Biodiversity, 2008.

York. Heating and Air Conditioning Technical Guide. 2026. https://www.upgnet.com/dsmarketingprod/gatekeeper/Documents/Archive_CDs/York_2 014/PDF_FILES/528195-ytg-l-1014.pdf.

City of Bakersfield – SCH No. 2025101507 8-1

8. List of Preparers

8.1 Lead Agency
City of Bakersfield
Development Services Department – Planning Division
Ashley Knight, Assistant Planner
Roque Nino, Principal Planner
Jennie Eng, Assistant Planning Director
Viridiana Gallargo-King, Deputy City Attorney II

8.2 EIR Preparers
Kimley-Horn and Associates, Inc.

Jessie Barkley, Project Manager
Alex Jewell, Director
Rachel Krusenoski, Senior Planner
Jessie Fan, ENV SP, Senior Planner
Mayra Garcia, AICP, Planner
Barsin Bet Govargez, PE, Civil Engineer
Michael Lepore, PE, Civil Engineer
Chris Gregerson, PE, Transportation
Laura Forinash, PE, Transportation
Ace Malisos, Air Quality and Noise
Max Bieber, Cultural Resources
Jessica Mauck, Cultural Resources
Lawrence Ornelas, Graphics Support

8.3 Technical Subconsultants
PlaceWorks
• Air Quality, Greenhouse Gas Emissions, and Energy Technical Study • Noise and Vibration Technical Study
• Water Supply and Demand Analysis
• Urban Decay Analysis Technical Memorandum
Hernandez Environmental Services
• General Biological Assessment
BCR Consulting LLC
• Cultural Resources Assessment
Geotechnical Professionals Inc.
• Geotechnical Investigation
Riverview Market Commercial Project
Environmental Impact Report 8.0 List of Preparers
City of Bakersfield – SCH No. 2025101507 8-2
PETROtech Resources Company
• Engineering Review of Plugged & Abandoned Oil & Gas Wellbores Rincon Consultants, Inc.
• Phase I Environmental Site Assessment
Integrated Engineering Group
• Transportation Analysis
Appendix A
Notice of Preparation and Notice of Preparation
Comments
Appendix A
Notice of Preparation and Notice of Preparation
Comments
Kimley»Horn
Appendix A-1
Notice of Preparation and Notice of Preparation
Presentation
Appendix A-1
Notice of Preparation and Notice of Preparation
Presentation
Kimley»Horn
The applications filed with the City of Bakersfield includes the following:

The discretionary entitlements, reviews, permits and approvals required to implement the Project include, but are not necessarily limited to, the following:

This Notice of Preparation (NOP) has been prepared to notify agencies, organizations, and interested parties that the City of Bakersfield (City), as the Lead Agency, will prepare an Environmental Impact Report (EIR) pursuant to the California Environmental Quality Act (CEQA) for the Coffee Road Ventures, LLC proposed Riverview Market Commercial Project (GPA File No. 23-0001) (Project). The City is requesting input from reviewing agencies and the public regarding the scope and content of the EIR.

The Project site is located in the northwestern portion of the City of Bakersfield (Figure 1, Regional Map). The Project Site is 46.16 acres which consists of one legal parcel (APN 368-010-05) and is an undeveloped L-shaped property situated along the south side of Rosedale Highway (CA-58), north of the railroad tracks, west of Coffee Road, and east of El Toro Viejo Road. The Project site is zoned M-2 (General Manufacturing) which allows the proposed commercial retail center use.

The Project involves construction and operation of the Riverview Market, a commercial retail center, that would encompass 405,531 square feet of total building space. The specific businesses and/or tenants that would ultimately occupy each of the buildings are not fully known at this time. However, it is assumed that larger anchor building's interior to the Project site would be occupied by markets, retail uses, storage uses, and a health club. The outer building pads would be occupied by smaller retail tenants, a medical office, drive-thru, fast casual and sit-down restaurants, a car wash, and a gas station with 20 dual-sided pumps. Other Project components include vehicular access and circulation improvements (both on- and off-site); surface parking areas and drive aisles; pedestrian access and circulation improvements; various landscape, hardscape, and lighting improvements; green space/park improvements; site and tenant signage; and infrastructure and utility improvements. Project construction is anticipated to occur over an approximately 20-month timeframe, commencing in early 2026 and ending in late-2027.

October 31,2025
State Clearinghouse, Agencies, Organizations, and Interested Parties Riverview Market Commercial Project
DATE:

TO:

PROJECT:
• General Plan Amendment (GPA) (of the land use element of the Metropolitan Bakersfield General Plan (General Plan) from P (Public Facilities) to LI (Light Industrial) • Site Plan Review consistent with the Bakersfield Municipal Code 17.08.140. • Tentative Subdivision Map
• Comprehensive Sign Plan
• Certification of an Environmental Impact Report

NOTICE OF PREPARATION OF AN

BAKERSFIELD ENVIRONMENTAL IMPACT REPORT
THE SOUND OF Sawtellinoy Belter
®
b_ NOTICE OF PREPARATION OF AN

BAKERSFIELD ENVIRONMENTAL IMPACT REPORT
THESOUNDOF SawtelbingBelfer
DATE: October 31, 2025
TO: State Clearinghouse, Agencies, Organizations, and Interested Parties PROJECT: Riverview Market Commercial Project
This Notice of Preparation (NOP) has been prepared to notify agencies, organizations, and interested parties that the City of Bakersfield (City), as the Lead Agency, will prepare an Environmental Impact Report (EIR) pursuant to the California Environmental Quality Act (CEQA) for the Coffee Road Ventures, LLC proposed Riverview Market Commercial Project (GPA File No. 23-0001) (Project). The City is requesting input from reviewing agencies and the public regarding the scope and content of the EIR.

The Project site is located in the northwestern portion of the City of Bakersfield (Figure 1, Regional Map). The Project Site is 46.16 acres which consists of one legal parcel (APN 368-010-05) and is an undeveloped L-shaped property situated along the south side of Rosedale Highway (CA-58), north of the railroad tracks, west of Coffee Road, and east of ElToro Viejo Road. The Project site is zoned M-2 (General Manufacturing) which allows the proposed commercial retail center use.

The Project involves construction and operation of the Riverview Market, a commercial retail center, that would encompass 405,531 square feet of total building space. The specific businesses and/or tenants that would ultimately occupy each of the buildings are not fully known aft this time. However, it is assumed that larger anchor building's interior to the Project site would be occupied by markets, retail uses, storage uses, and a health club. The outer building pads would be occupied by smaller retail tenants, a medical office, drive-thru, fast casual and sit-down restaurants, a car wash, and a gas station with 20 dual-sided pumps. Other Project components include vehicular access and circulation improvements (both on- and off-site); surface parking areas and drive aisles; pedestrian access and circulation improvements; various landscape, hardscape, and lighting improvements; green space/park improvements; site and tenant signage; and infrastructure and utility improvements. Project construction is anticipated to occur over an approximately 20-month timeframe, commencing in early 2026 and ending in late-2027.

The discretionary entitlements, reviews, permits and approvals required to implement the Project include, but are not necessarily limited to, the following:
e General Plan Amendment (GPA) (of the land use element of the Metropolitan Bakersfield General Plan (General Plan) from P {Public Facilities) to LI (Light Industrial) Site Plan Review consistent with the Bakersfield Municipal Code 17.08.140.

Tentative Subdivision Map
Comprehensive Sign Plan
Certification of an Environmental Impact Report
The applications filed with the City of Bakersfield includes the following:

The Notice of Preparation is available on the City’s website at the following URL:
https://www.bakersfieldcity.us/279/Environmental-Documents Opportunity for Public Review and Comment: The issuance of this NOP triggers a 32-day public scoping period. The scoping period begins on October 31, 2025, and ends on December 1, 2025. Comments may be sent to the City at any time during the 32-day public scoping period.

Please focus your comments on issues related to the scope and content of the environmental analysis that will be included in the EIR. All scoping comments must be received by the City or postmarked by December 1, 2025. Due to the time limits mandated by state law, the City recommends that your feedback is provided at the earliest possible date but not provided later than 32 days after the date of this notice. Trustee Agencies and Responsible agencies are asked to identify their statutory authorities pertaining to the Project. If applicable, please include the name and contact information of a contact person for your agency. Direct all comments to:

Scope of the EIR: In accordance with CEQA, the City requests that agencies review the description of the Project provided in this NOP and provide comments or guidance on the scope of environmental issues related to the statutory responsibilities of the Lead Agency. The EIR will be used by the City when considering the Project for approval and by other Responsible and Trustee Agencies to support their discretionary actions related to the Project, as applicable.

The City is also seeking comments from residents, property owners, and other interested parties regarding issues they believe should be addressed in the EIR. A regional map, local vicinity map, and site plan are attached.

Potential Environmental Impacts: The Draft EIR will examine potential environmental impacts generated by the project in relation to the following Environmental Analysis categories:

Aesthetics, Agricultural and Forest Resources, Air Quality, Biological Resources, Cultural Resources, Energy, Geology and Soils, Greenhouse Gas Emissions, Hazards and Hazardous Materials, Hydrology and Water Quality, Land Use and Planning, Mineral Resources, Noise, Population and Housing, Public Services, Recreation, Transportation, Tribal Cultural Resources, Utilities and Service Systems, and Wildfire.

The EIR will assess the effects of the Project on the environment, identify potentially significant impacts, identify feasible mitigation measures to reduce or eliminate potentially significant environmental impacts, and discuss potentially feasible alternatives to the Project that may accomplish basic objectives while lessening or eliminating any potentially significant Project-related impacts. • General Plan Amendment 23-0001 to change the general plan designation from P (Public Facilities) to Li (Light Industrial).
• Site Plan Review No. 23-0223 for the development of a 46.16-acre commercial retail development.

City of Bakersfield
Development Services Department - Planning Division
Attn: Ashley Knight, Assistant Planner
1715 Chester Avenue, 2nd Floor
Bakersfield, CA 93301
e General Plan Amendment 23-0001 to change the general plan designation from P (Public Facilities) to LI (Light Industrial}.
e Site Plan Review No. 23-0223 for the development of a 46.16-acre commercial retail development,
Scope of the EIR: In accordance with CEQA, the City requests that agencies review the description of the Project provided in this NOP and provide comments or guidance on the scope of environmental issues related to the statutory responsibilities of the Lead Agency. The EIR will be used by the City when considering the Project for approval and by other Responsible and Trustee Agencies to support their discretionary actions related to the Project, as applicable.

The City is also seeking comments from residents, property owners, and other interested parties regarding issues they believe should be addressed in the EIR.A regional map, local vicinity map, and site plan are attached.

Potential Environmental Impacts: The Draft EIR will examine potential environmental impacts generated by the project in relation to the following Environmental Analysis categories:

Aesthetics, Agricultural and Forest Resources, Air Quality, Biological Resources, Cultural Resources, Energy, Geology and Soils, Greenhouse Gas Emissions, Hazards and Hazardous Materials, Hydrology and Water Quality, Land Use and Planning, Mineral Resources, Noise, Population and Housing, Public Services, Recreation, Transportation, Tribal Cultural Resources, Utilities and Service Systems, and Wildfire.

The EIR will assess the effects of the Project on the environment, identify potentially significant impacts, identify feasible mitigation measures to reduce or eliminate potentially significant environmental impacts, and discuss potentially feasible alternatives to the Project that may accomplish basic objectives while lessening or eliminating any potentially significant Project-related impacts.

The Notice of Preparation is available on the City's website at the following URL:
https://www.bakersfieldcity.us/279/Environmental-Documents Opportunity for Public Review and Comment: The issuance of this NOP triggers a 32-day public scoping period. The scoping period begins on October 31, 2025, and ends on December 1, 2025. Comments may be sent to the City at any time during the 32-day public scoping period.

Please focus your comments on issues related to the scope and content of the environmental analysis that will be included in the EIR. All scoping comments must be received by the City or postmarked by December 1, 2025. Due to the time limits mandated by state law, the City recommends that your feedback is provided at the earliest possible date but not provided later than 32 days after the date of this notice. Trustee Agencies and Responsible agencies are asked fo identify their statutory authorities pertaining to the Project. If applicable, please include the name and contact information of a contact person for your agency. Direct all comments to:

City of Bakersfield
Development Services Department —Planning Division
Attn: Ashley Knight, Assistant Planner
1715 Chester Avenue, 2nd Floor
Bakersfield, CA 93301
Attachments:

Figure 1 - Regional Map
Figure 2 - Local Vicinity Map
Figure 3 - Conceptual Site Plan
An EIR public scoping meeting for the Project will be noticed separately. Comments may also be emailed to [email protected]
An EIR public scoping meeting for the Project will be noticed separately. Comments may also be emailed to [email protected]
Attachments:

Figure 1 —-Regional Map
Figure 2 - Local Vicinity Map
Figure 3 —Conceptual Site Plan
G9
Shafter
Smith Corner )) 66
8LL
T
Project Site &V

RIO BRAVO
OAES oiy 602,@2 1 78. Tarina Calders Corner ( A=====x! Hillcrest Bakersfield East Nd uX 85 SUNSET 85 85 P 85 Kayandee Edison
&V SEVEN OAKS 8L
Stevens VENOLA
Rexland Acres CAMPUS PARK Fuller Acres
85 119
Lamont
Di Giorgio El Adobe
Alameda Weedpatch Lakeside
I
SOURCE: Google Maps, 2024
FIGURE 1: Regional Location Map N

RIVERVIEW MARKET PROJECT STN
Kimley>»Horn
Pumpkin
Center
CORNER

MYRICKS

CITY IN

THE HILLS
East '
Bakersfield
Edmundson
Acres
Bakersfield
Municipal Airport
California State
University, Bakersfield
Rosedale Hwy--*r

GREENACRES
/d3ONV31O i
Niles
\

MYRICKS
N_ CORNER Shafter
go65
Smith ne
\
Ri, Bravo,
N|
! \
@3 — a : - CaldersiCornen RosedalesHwymgr

GREENACRES
Gor : . , 7 California State I 43 p SEVEN OAKS- ) University, Bakersfield BY ~~ } B ’ IN — | [I RET— Stevens bo venota-\
[CAMPUSPARK = = Tarina i i \ -RexlandAcres Bakersfield MunicipalFullerfAcres Airport | Pumpkin 1
Centery — Lamont
| — -— 184 ps
Col | ElAdobe DiGiorgio
f + -Alameda-- ———————, - t
Lakeside \ | 8 Weedpatch Edmulidson | | | Adres
SOURCE:GoogleMaps, 2024
N.T.S.
0 FIGURE1: RegionalLocationMap RIVERVIEWMARKETPROJECT
Kimley»Horn
= T ______ L_________ -- Mh.________ 1 _____ .-l^ ■ . I s e:
r m f! : “Set ‘ U,6- —l
■ %
eale . 3 'I
P—"teas2 L
**re—a
aE-n) he ttzde y s $ 7.

Mlllh” C I1 Tt t
DI—R
sil
■ Ml
J
J pgjem l d 0 a’W ’ COMMERCIAL hi
. "Ea15
■- SHO ====
sors —r
lVJdHNWOO.: -7* -IVIOdaNW00: glVNSQISAL Project Site 7 ;t i 2, " 79 i mm l > I INDUSTRIAL 3ardit seern I 4 als. _ V fel L 2‘ US P~ N‘ T9 * h -v.- Mime & t‘s t wr1 meslll 2 % ‘ (0 ©3 L 0.8,"99 LC r. wimweuBT==s E reee tt r I Si **. 8.9 - r / —io] l =* I
:ere
g ■ ==2/; T — #C._Mtu wetye ------- - ha
\----------------------
iie tee “F I Be 11 r< X L I WUII s
SOURCE: Google Earth Pro, 2024
FIGURE 2: Local Vicinity Map

RIVERVIEW MARKET PROJECT
Kimley>»Horn
39093aeBa

AVOUIUMOC
Li
euowuelOEeang
aeposod
gR
tassa
Jo
STN 4NB
Ie I
pi
9O
“y A i. 19.
7rs9
avkd! Biter LEL
I=
ss-nim
<Sn _E
PP., 2y A"A",
Y-"s
E.E’g . •
rrwm-d
. 6
aui
uu
y
lt
1444
ftte \ LESAES,
cl was-oul i 28
FIGURE2: LocalVicinity Map

RIVERVIEWMARKETPROJECT
Kimley»Horn
*
: *
zI 4
S' 4

1. I
J'
—
Ill
284 B8I
III II I I 1 “5 A0
|!
5 .okC
iprrrr p p l
&2II ‘4141114441
0-0-0
O
P 111
00 % weY 109 109007*9.
tn Ut1t
F
C
le
—DO
—
so—80
-0

STORAGE BLDG
(=500 UNITS)
=40,000 SF

SPPNKLERED
0 0 —
§ 1.
■wppp
opppp
5 819 42
m s c T
-9 82 r"IR Ii
3 n
44g ll 44 Bisisi IzT I e
' 8 :71 $
.Cx
E
3 2
======= I 3
4, Vig' ill l «I O
.g
I
J
1 ( I - I
4 t.
r
ii ।
Li
Xi s"
* 1 I i t 808—8 -

COFFEE ROAD
I
f
f
aslm 2 o 2 ■ 38 o
D 2 9 8
2 E7 8E
28 8
13 1962
HTHTHa.

PL b SHOPS 2 1
2 RETAIL/FAST—
‘ gtmmntnhTT cuuusu MA s (GTNJMMurf) WWAHTTT."5) "ni 1— 8 % Fst |YlYTl$ JTHTT 1 -9NKYO- 3018940 -
I........... 4............. 7 AGMSB, iiiiiiiuii J 7 2U
1111F if

10.000 SF

MAJOR D
!

SPRINKLERED
Swj MAJOR C 10,000 SF SPHNKLEHEP
1 MAJOR B .
. MARKET. s
34,971 SF 8

SPRINKLERED
CASUAL REST.

10.85BSF
GmimigminCLL-ra
MAR 5
. sPRTNRZERFD .

MAJOR G:

MAJOR F
RETAIL
18,012 SF
SPRINKLEHED mnuaoennD)
d.

IPAPAINC a | ML 75
000..........Mtte Q fWhM OnMM) WNTN 1
I
LreL I 13
I
tr i- #/ “0 —10MDE /
i// 3 //

MU-TI-JSE PATH
III
Il
Q
/// / ;
MAOX H
spRNKI RRED
DaHSTNNeS

MAJOR I
25,013 SF
SPRINKLERED 18-0

MAJOR J

SPRINKLERED
15 LANDSCAPES <
uu ullllLL*
(
9 - 7
I to-0E
TOMT“=
I
■ PROPERTY LINE MoVSISSul £
+HHL J - 8
t sd mu HIM dd
fffffTTIf “ffffffffTfffffff
tIIIIITHtIHHHHHHHHO-pTTTmnnns

OIIIIIIIIIIIIIIIIIIIII OPEN GREEN SPACE
)
II I1

PRELIMINARY I

RETENTION-BASIN J
ans
JVd
EkiSTNGRAFHC — sawL ......

RETAIL DT RESTAURANT 1V1S8 1 — I NON-SPRINKLEHED NON SPRINKLERED SPHINKLERED SPRINKLERED I
-PROPERTYLNE

PG&E SETBACK

DSCAPE SETBACK

PROPOSED LEFT

TURN POCKET

ISTING TRAFFIC
DT REST RETAIL.
10 WIDE
[MULTI-USE PATH
sEY&A&K

CASUAL DT/FAST
PAD 10
REST,

SPRINKLERED
RETAIL

SPRINKLEREDREST,PADS
SPRINKLERED _____ SPRINKLERED
______ 6,698 SF---
PAD 2 ----------CAR WASH-------- 4. log SF______ ______ DT/FAST CASUAL____________ RESTAURANT - - ROSEDALE HIGHWAY- -brnegsaunanr DT^PAN,- _______________________________________________________________ NON-SPRINKLERED RESTAURANT '/EAST CASUAL - -PAD_,——
SOURCE: McG Architecture, 2025
Kimley»Horn
N.T.S.
"NP FIGURE 3: Conceptual Site Plan

RIVERVIEW MARKET PROJECT

PROPOSEDLEFT TURNPOCKET
e_ PADS o_o __.__.__._________.\ _____ DT/FASTCASUAL _ “pang RESTAURANT RES sPRNHLERED ==ems — — ! SPAINKLERED SPRINKLCACD oo=ewaTAREE 500UNTTS) 40.000 SF
E

STORAGE BLDG
SPRINKLEREDe
+ +133 &
(Lr re KE
B=) Ll %
CONTROLLER FUEL CANOPY CONTROLLER CE FotisDoryCoon 308 SF DISPENSERS 120 SF —_—

CASUALREST,
SPRINKLERED Tafios RETAIL
||
|
iting
||
PAD | SrodetsrmemaL

COFFEE ROAD
FANRLFrED
SOURCE:McGArchitecture,2025
FIGURE3: ConceptualSitePlan

RIVERVIEWMARKETPROJECT
Kimley»Horn
J Project Site s t
L 5 [l A
- ‘S 9
51: "sas.

I
Riverview Market Commercial Project Overview
6/25/2026
Introductions
• Lead Agency: City of Bakersfield
1 2
r
Riverview Market Commercial Project Overview
pl — -- -hosi
er
■ AOSEDNB HGHWa-n L)
ah
Hl
5 178n t
—
E
10 TO r
5 I
8 3 4
1 • Roque Nino, Principal Planner
• Ashley Knight, Assistant Planner
%
#-
• EIR Preparer: Kimley-Horn and Associates, Inc.
• Jessie Barkley, Project Manager
Kimley>»Horn
Riverview Market
Commercial
Project
Environmental Impact Report (EIR)
Scoping Meeting
November 20, 2025
i
1 wa.

I
[EEN
6/25/2026
Riverview Market
Commercial
Project Environmental impact Report (EIR)
Scoping Meeting November 20, 2025
Kimley»Horn
§ Introductions
+ Lead Agency: City of Bakersfield
* Roque Nino, Principal Planner
+ Ashley Knight, Assistant Planner
+ EIR Preparer: Kimley-Horn and Associates, Inc.
+ Jessie Barkley, Project Manager
Riverview Market Commercial Project Overview Riverview Market Commercial Project Overview 6/25/2026
Riverview Market Commercial Project Overview CEQA Process P
/
eirortaktmmnouoscarBEG@GDGS®MON
fe
ton -
70 I
£
5 6
EIR Topics Purpose of an EIR
7 8
2 Aesthetics
Agriculture and Forestry
Air Quality
Biological Resources
Cultural Resources
Energy
Geology and Soils
Greenhouse Gas Emissions
Hazards and Hazardous Materials
Hydrology and Water Quality
Land Use and Planning
Mineral Resources
Noise
Population and Housing
Public Services
Recreation
Transportation / VMT
Tribal Cultural Resources
Utilities and Service Systems
Wildfire
Based on the NOP, the following topics will be addressed in the Project EIR:
• Shares information with the public regarding a project’s potential impacts • Identifies mitigation and ways to avoid/reduce impacts • Analyzes alternatives to the proposed project
• Fosters interagency coordination and public review
• Provides a comprehensive environmental document that serves as a guiding tool for decision makers
• The California Environmental Quality Act (CEQA) is required for discretionary approvals
• Purpose is to inform decision makers and the public of potential effects of project approval
• Identify ways to avoid or reduce environmental impacts • Define and analyze alternatives; and
• Foster inter-agency coordination and public review/participation 6/25/2026
CEQA Process Riverview Market Commercial Project Overview eB Ei, aoe dl]
« The California Environmental Quality Act (CEQA) is required for discretionary approvals = Purpose is to inform decision makers and the public of potential effects of project approval
«Identify ways to avoid or reduce environmental impacts = Define and analyze alternatives; and = Foster inter-agency coordination and public review/participation EIR Topics
Based on the NOP, the following topics will be addressed in the Project EIR: Purpose of an EIR
+ Shares information with the public regarding a project's potential impacts : Aesthetics : Vinorol ressurons + Identifies mitigation and ways to avoid/reduce impacts : Agricullura and Foresiry + Noise «Analyzes alternatives to the proposed project + Air Quality Population and Housing Public Services Recreation Transportation / VMT Tribal Cultural Resources Utilities and Service Systems Wildfire Biological Resources Cultural Resources Energy
Geology and Soils Greenhouse Gas Emissions Hazards and Hazardous Materials Hydrology and Water Quality Fosters interagency coordination and public review
Provides a comprehensive environmental document that serves as a guiding tool for decision makers
6/25/2026
Purpose of a Scoping Meeting Environmental Review Process • Presents the project and environmental process
☆ Planning Commission
City Council
• No decision is being made on the project tonight File Notice of Determination □ = Opportunities for Public Input 77 = We are here in the process 9 10
Four Ways to Submit Comments By December 1, 2025
■ Submit written comments at this meeting
■ Speak at the podium
■ By email: [email protected]
Thank you
li 12
3 By mail: Attn: Ashley Knight, Assistant Planner
1715 Chester Avenue, 2nd Floor
Bakersfield, CA 93301
REMINDER: Comments should be focused on the scope and content of the environmental information to be included in the Environmental Impact Report (EIR).

Scoping Meeting
November 20, 2025
• Provides an opportunity for public input (A scoping meeting is not the only opportunity for input)
♦ Public comments from the Notice of Preparation public review period and scoping meeting help inform the scope, focus, and content of the upcoming EIR.

Public & Agency
Revjota Reviseg Preft 5B
Prepare Final EIR including Responses
to Comments
Prepare EIR
Winter 2025 through Spring 2026
Prepare/Distribute Notice of Preparation
(30-day review ends December 1, 2025)
6/25/2026
Purpose of a Scoping Meeting Environmental Review Process | . Bistribute Notice of Preparation Presents the project and environmental process ciay review ends December1,2025) Prepare Final EIR including Responses " to Comments
«Provides an opportunity for public input (A scoping meeting is not the only Scoping Meeting Planning Commission opportunity for input) November 20, 2025 « Public comments from the Notice of Preparation public review period and PrepareEIR scoping meeting help inform the scope, focus, and content of the upcoming EIR. Winter 2025 through Spring 2006 City Council M Public &
« No decision is being made on the project tonight i w of vias File Notice of Determinatio iewperiodin 5 +d [Il - ovvortunities for Public Input ¢ = We are here in the process our Ways to Submit Comments By December 1, 2025
» Submit written comments at this meeting
Speak at the podium
» By email:[email protected]
» By mail: Attn: Ashley Knight, Assistant Planner 1715 Chester Avenue, 2nd Floor Bakersfield, CA 93301 Thank you REMINDER: Comments should be focused on the scope and content of the environmental information to be included in the Environmental Impact Report (EIR). 11 Appendix A-2
Notice of Preparation Comments
Appendix A-2
Notice of Preparation Comments
Kimley»Horn
CRICAN STATE OF CALIFORNIA Gavin Newsom, Governor
NATIVE AMERICAN HERITAGE COMMISSION CPOctober 31,2025
Re 2025101507 Riverview Market Commercial Project, Kern County Dear Ms. Knight:

Page 1 of 5 ends

COMMISSIONER
Vacant

PARLIAMENTARIAN
Wayne Nelson
Luiseno

ACTING EXECUTIVE

SECRETARY
Michelle Carr

COMMISSIONER
Vacant
The NAHC recommends consultation with California Native American tribes that are traditionally and culturally affiliated with the geographic area of your proposed project as early as possible in order to avoid inadvertent discoveries of Native American human remains and best protect tribal cultural resources. Below is a brief summary of portions of AB 52 and SB 18 as well as the NAHC's recommendations for conducting cultural resources assessments.

Consult your legal counsel about compliance with AB 52 and SB 18 as well as compliance with any other applicable laws.

CEQA was amended significantly in 2014. Assembly Bill 52 (Gatto, Chapter 532, Statutes of 2014) (AB 52) amended CEQA to create a separate category of cultural resources, “tribal cultural resources" (Pub, Resources Code §21074) and provides that a project with an effect that may cause a substantial adverse change in the significance of a tribal cultural resource is a project that may have a significant effect on the environment. (Pub. Resources Code §21084.2). Public agencies shall, when feasible, avoid damaging effects to any tribal cultural resource. (Pub. Resources Code §21084.3 (a)). AB 52 applies to any project for which a notice of preparation, a notice of negative declaration, or a mitigated negative declaration is filed on or after July 1,2015. If your project involves the adoption of or amendment to a general plan or a specific plan, or the designation or proposed designation of open space, on or after March 1, 2005, it may also be subject to Senate Bill 18 (Burton, Chapter 905, Statutes of 2004) (SB 18).

Both SB 18 and AB 52 have tribal consultation requirements. If your project is also subject to the federal National Environmental Policy Act (42 U.S.C. § 4321 et seq.) (NEPA), the tribal consultation requirements of Section 106 of the National Historic Preservation Act of 1966 (154 U.S.C. 300101,36 C.F.R. §800 et seq.) may also apply.

COMMISSIONER
Bennae Calac
Pauma-Yuima Band of
Luiseno Indians

COMMISSIONER
Sara Dutschke
Miwok

SECRETARY
Isaac Bojorquez
Ohlone-Costanoan

COMMISSIONER
Stanley Rodriguez
Kumeyaay
The Native American Heritage Commission (NAHC) has received the Notice of Preparation (NOP), Draft Environmental Impact Report (DEIR) or Early Consultation for the project referenced above. The California Environmental Quality Act (CEQA) (Pub. Resources Code §21000 et seq.), specifically Public Resources Code §21084.1, states that a project that may cause a substantial adverse change in the significance of a historical resource, is a project that may have a significant effect on the environment. (Pub. Resources Code § 21084.1; Cal. Code Regs., tit. 14. § 15064.5 (b) (CEQA Guidelines § 15064.5 (b)). If there is substantial evidence, in light of the whole record before a lead agency, that a project may have a significant effect on the environment, an Environmental Impact Report (EIR) shall be prepared. (Pub. Resources Code §21080 (d); Cal. Code Regs., tit. 14. § 5064 subd.(a)(1) (CEQA Guidelines § 15064 (a)(1)).

In order to determine whether a project will cause a substantial adverse change in the significance of a historical resource, a lead agency will need to determine whether there are historical resources within the area of potential effect (APE).

CHAIRPERSON
Reginald Pagaling
Chumash

VICE-CHAIRPERSON
Buffy McQuillen
Yokayo Pomo. Yuki.

Nomlaki
Ashley Knight
City of Bakersfield
1715 Chester Ave
2 nd Floor
Bakersfield CA 93301
ST
zr

NAHC HEADQUARTERS
1550 Harbor Boulevard
Suite 100
West Sacramento,
California 95691
(916) 373-3710
nahcanahc.ca.gov
V
2 k

CHAIRPERSON
Reginald Pagaling
Chumash

VICE-CHAIRPERSON
Buffy McQuillen
Yokayo Pomo, Yuki,
Nomiaki

SECRETARY
Isaac Bojorquez
Ohlone-Costanoan

PARLIAMENTARIAN
Wayne Neilson
Luisefio

COMMISSIONER
Sara Dutschke
Miwok
COMMISSIONER Stanley Rodriguez
Kumeyaay

COMMISSIONER
Bennae Calac
Pauma-Yuima Band of
Luisefio Indians

COMMISSIONER
Vacant

COMMISSIONER
Vacant

ACTING EXECUTIVE

SECRETARY
Michelle Carr

NAHC HEADQUARTERS
1550 Harbor Boulevard
Suite 100
West Sacramento,
California 95691
(916) 373-3710
nghc¢ anahc.ca.gov
GavinNewsom.Governor

NATIVE AMERICAN HERITAGE COMMISSION
October 31, 2025
Ashley Knight
City of Bakersfield
1715 Chester Ave
2ndFloor
Bakersfield CA 93301
Re 2025101507 Riverview Market Commercial Project, Kern County Dear Ms. Knight:

The Native American Heritage Commission (NAHC) has received the Notice of Preparation (NOP), Draft Environmental Impact Report (DEIR) or Early Consultation for the project referenced above. The California Environmental Quality Act (CEQA) (Pub. Resources Code §21000 et seq.), specifically Public Resources Code §21084.1, states that a project that may cause a substantial adverse change in the significance of a historical resource, is a project that may have a significant effect on the environment. (Pub. Resources Code § 21084.1; Cal. Code Regs. tit.14, §15064.5 (b) (CEQA Guidelines §15064.5 (b)). If there is substantial evidence, in light of the whole record before a lead agency, that a project may have a significant effect on the environment, an Environmental Impact Report (EIR) shall be prepared. (Pub. Resources Code §21080 (d): Cal. Code Regs., tit. 14, § 5064 subd.(a)(1) (CEQA Guidelines §15064 (a)(1}).

In order to determine whether a project will cause a substantial adverse change in the significance of a historical resource, a lead agency will need to determine whether there are historical resources within the area of potential effect (APE).

CEQA was amended significantly in 2014. Assembly Bill52 (Gatto, Chapter 532, Statutes of 2014) (AB 52) amended CEQA to create a separate category of cultural resources, “tribal cultural resources” (Pub. Resources Code §21074) and provides that a project with an effect that may cause a substantial adverse change in the significance of a tribal cultural resource is a project that may have a significant effect on the environment. (Pub. Resources Code §21084.2). Public agencies shall, when feasible, avoid damaging effects to any tribal cultural resource. (Pub. Resources Code §21084.3 (a). AB 52 applies to any project for which a notice of preparation, a notice of negative declaration, or a mitigated negative declaration is filed on or after July 1, 2015. If your project involves the adoption of or amendment to a general plan or a specific plan, or the designation or proposed designation of open space, on or afterMarch 1, 2005, it may also be subject to Senate Bill 18 (Burton, Chapter 905, Statutes of 2004) (SB 18). Both SB18 and AB 52 have tribal consultation requirements. If your project is also subject to the federal National Environmental Policy Act (42 U.S.C. § 4321 et seq.) (NEPA), the tribal consultation requirements of Section 106 of the National Historic Preservation Act of 1966 (154 U.S.C. 300101, 36 C.F.R. §800 et seq.) may also apply.

The NAHC recommends consultation with California Native American tribes that are traditionally and culturally affiliated with the geographic area of your proposed project as early as possible in order to avoid inadvertent discoveries of Native American human remains and best protect tribal cultural resources. Below is a brief summary of portions of AB 52 and SB 18 as well as the NAHC's recommendations for conducting cultural resources assessments.

Consult your legal counsel about compliance with AB 52 and SB18 as well as compliance with any other applicable laws.

Page 1 of 5 ends

AB 52
AB 52 has added to CEQA the additional requirements listed below, along with many other requirements:
a. For purposes of AB 52, “consultation shall have the same meaning as provided in Gov. Code §65352.4 (SB 18). (Pub. Resources Code §21080.3.1 (b)).

4. Discretionary Topics of Consultation: The following topics are discretionary topics of consultation:
may recommend to the lead agency. (Pub. Resources Code §21080.3.2 (a)). a. Whether the proposed project has a significant impact on an identified tribal cultural resource.

Page 2 of 5 ends

2. Begin Consultation Within 30 Days of Receiving a Tribe's Request for Consultation and Before Releasing a Negative Declaration, Mitigated Negative Declaration, or Environmental Impact Report: A lead agency shall begin the consultation process within 30 days of receiving a request for consultation from a California Native American tribe that is traditionally and culturally affiliated with the geographic area of the proposed project. (Pub. Resources Code §21080.3.1, subds. (d) and (e)) and prior to the release of a negative declaration, mitigated negative declaration or Environmental Impact Report. (Pub. Resources Code §21080.3.1 (b)).

Type of environmental review necessary.

Significance of the tribal cultural resources.

Significance of the project's impacts on tribal cultural resources.

If necessary, project alternatives or appropriate measures for preservation or mitigation that the tribe

5. Confidentiality of Information Submitted by a Tribe During the Environmental Review Process: With some exceptions, any information, including but not limited to, the location, description, and use of tribal cultural resources submitted by a California Native American tribe during the environmental review process shall not be included in the environmental document or otherwise disclosed by the lead agency or any other public agency to the public, consistent with Government Code §6254 (r) and §6254.10. Any information submitted by a California Native American tribe during the consultation or environmental review process shall be published in a confidential appendix to the environmental document unless the tribe that provided the information consents, in writing, to the disclosure of some or all of the information to the public. (Pub. Resources Code §21082.3 (c)(1)).

6. Discussion of Impacts to Tribal Cultural Resources in the Environmental Document: If a project may have a significant impact on a tribal cultural resource, the lead agency’s environmental document shall discuss both of the following:
b. Whether feasible alternatives or mitigation measures, including those measures that may be agreed to pursuant to Public Resources Code §21082.3, subdivision (a), avoid or substantially lessen the impact on the identified tribal cultural resource. (Pub. Resources Code §21082.3 (b)).

1. Fourteen Day Period to Provide Notice of Completion of an Application/Decision to Undertake a Project:

Within fourteen (14) days of determining that an application for a project is complete or of a decision by a public agency to undertake a project, a lead agency shall provide formal notification to a designated contact of, or tribal representative of, traditionally and culturally affiliated California Native American tribes that have requested notice, to be accomplished by at least one written notice that includes:
a. A brief description of the project.
b. The lead agency contact information.
c. Notification that the California Native American tribe has 30 days to request consultation. (Pub.

Resources Code §21080.3.1 (d)).
d. A "California Native American tribe” is defined as a Native American tribe located in California that is on the contact list maintained by the NAHC for the purposes of Chapter 905 of Statutes of 2004 (SB 18). (Pub. Resources Code §21073).
a.
b.
c.
d.

3. Mandatory Topics of Consultation If Requested by a Tribe: The following topics of consultation, if a tribe requests to discuss them, are mandatory topics of consultation:
a. Alternatives to the project.
b. Recommended mitigation measures.
c. Significant effects. (Pub. Resources Code §21080.3.2 (a)).

AB 52
AB 52 has added to CEQA the additional requirements listed below, along with many other requirements:

1. Fourteen Day Period to Provide Notice of Completion of an Application/Decision to Undertake a Project: Within fourteen (14) days of determining that an application for a project is complete or of a decision by a public agency to undertake a project, a lead agency shall provide formal notification to a designated contact of, or tribal representative of, traditionally and culturally affiliated California Native American tribes that have requested notice, to be accomplished by at least one written notice that includes:
a. A brief description of the project.
b. The lead agency contact information.
c. Notification that theCalifornia Native American tribe has 30 days to request consultation. {Pub.

Resources Code §21080.3.1 (d)).
d. A “California Native American tribe” is defined as a Native American tribe located in California that is on the contact list maintained by the NAHC for the purposes of Chapter 905 of Statutes of 2004 [SB 18). (Pub. Resources Code §21073).

2. Begin Consultation Within 30 Days of Receiving a Tribe's Request for Consultation and Before Releasing a Negative Declaration, Mitigated Negative Declaration, or EnvironmentalImpact Report: A lead agency shall begin the consultation process within 30 days of receiving a request for consultation from a California Native American tribe that is traditionally and culturally affiliated with the geographic area of the proposed project. (Pub. Resources Code §21080.3.1, subds. (d) and (e)) and prior to the release of a negative declaration, mitigated negative declaration or Environmental Impact Report. (Pub. Resources Code §21080.3.1(b}). a. For purposes of AB 52, “consultation shall have the same meaning as provided in Gov, Code §65352.4 {SB 18). (Pub. Resources Code §21080.3.1 (b)).

3. Mandatory Topics of Consultation If Requested by a Tribe: The following topics of consultation, if a tribe requests to discuss them, are mandatory topics of consultation:
a. Alternatives to the project.
b. Recommended mitigation measures.
c. Significant effects. (Pub. Resources Code §21080.3.2 {a}).

4. Discretionary Topics of Consultation: The following topics are discretionary topics of consultation:
a. Type of environmental review necessary.
b. Significance of the tribal cultural resources.
¢. Significance of the project's impacts on tribal cultural resources. d. [fnecessary. project alternatives or appropriate measures for preservation or mitigation that the tribe may recommend to the lead agency. (Pub. Resources Code §21080.3.2 (a).

5. Confidentiality of information Submitted by a Tribe During the Environmental Review Process: With some exceptions, any information, including but not limited to, the location, description, and use of tribal cultural resources submitted by a California Native American tribe during the environmental review process shall not be included in the environmental document or otherwise disclosed by the lead agency or any other public agency to the public, consistent with Government Code §6254 (r) and §6254.10. Any information submitted bya California Native American fribe during the consultation or environmental review process shall be published in a confidential appendix to the environmental document unless the tribe that provided the information consents, in writing, to the disclosure of some or all of the information to the public. (Pub. Resources Code §21082.3 (c}(1]}.

6. Discussion of Impacts to Tribal Cultural Resources in the Environmental Document: If a project may hove a significant impact on a tribal cultural resource, the lead agency's environmental document shall discuss both of the following:
a. Whether the proposed project has a significant impact on an identified tribal cultural resource. b. Whether feasible alternatives or mitigation measures, including those measures that may be agreed to pursuant to Public Resources Code §21082.3, subdivision (a), avoid or substantially lessen the impact on the identified tribal cultural resource. (Pub. Resources Code §21082.3 {b)).

Page 2 of 5 ends

a. The parties agree to measures to mitigate or avoid a significant effect, if a significant effect exists, on a. Avoidance and preservation of the resources in place, including, but not limited to:
i. Planning and construction to avoid the resources and protect the cultural and natural c. Permanent conservation easements or other interests in real property, with culturally appropriate e. Please note that a federally recognized California Native American tribe or a non-federally f. Please note that it is the policy of the state that Native American remains and associated grave artifacts shall be repatriated. (Pub. Resources Code §5097.991). a. The consultation process between the tribes and the lead agency has occurred as provided in Public recognized California Native American tribe that is on the contact list maintained by the NAHC to protect a California prehistoric, archaeological, cultural, spiritual, or ceremonial place may acquire and hold conservation easements if the conservation easement is voluntarily conveyed. (Civ. Code §815.3 (c)).

10. Examples of Mitigation Measures That, If Feasible, May Be Considered to Avoid or Minimize Significant Adverse Impacts to Tribal Cultural Resources:

8. Recommending Mitigation Measures Agreed Upon in Consultation in the Environmental Document: Any mitigation measures agreed upon in the consultation conducted pursuant to Public Resources Code §21080.3.2 shall be recommended for inclusion in the environmental document and in an adopted mitigation monitoring and reporting program, if determined to avoid or lessen the impact pursuant to Public Resources Code §21082.3, subdivision (b), paragraph 2, and shall be fully enforceable. (Pub. Resources Code §21082.3 (a)). management criteria for the purposes of preserving or utilizing the resources or places, d. Protecting the resource. (Pub. Resource Code §21084.3 (b)). a tribal cultural resource; or
b. A party, acting in good faith and after reasonable effort, concludes that mutual agreement cannot be reached. (Pub. Resources Code §21080.3.2 (b)).

Resources Code §21080.3.1 and §21080.3.2 and concluded pursuant to Public Resources Code §21080.3.2.
b. The tribe that requested consultation failed to provide comments to the lead agency or otherwise failed to engage in the consultation process.
c. The lead agency provided notice of the project to the tribe in compliance with Public Resources Code §21080.3.1 (d) and the tribe failed to request consultation within 30 days. (Pub. Resources Code §21082.3 (d)).

7. Conclusion of Consultation: Consultation with a tribe shall be considered concluded when either of the following occurs:

11. Prerequisites for Certifying an Environmental Impact Report or Adopting a Mitigated Negative Declaration or Negative Declaration with a Significant Impact on an Identified Tribal Cultural Resource: An Environmental Impact Report may not be certified, nor may a mitigated negative declaration or a negative declaration be adopted unless one of the following occurs:

9. Required Consideration of Feasible Mitigation: If mitigation measures recommended by the staff of the lead agency as a result of the consultation process are not included in the environmental document or if there are no agreed upon mitigation measures at the conclusion of consultation, or if consultation does not occur, and if substantial evidence demonstrates that a project will cause a significant effect to a tribal cultural resource, the lead agency shall consider feasible mitigation pursuant to Public Resources Code §21084.3 (b). (Pub. Resources Code §21082.3 (e)).
context.
ii. Planning greenspace, parks, or other open space, to incorporate the resources with culturally appropriate protection and management criteria.
b. Treating the resource with culturally appropriate dignity, taking into account the tribal cultural values and meaning of the resource, including, but not limited to, the following:
i. Protecting the cultural character and integrity of the resource. ii. Protecting the traditional use of the resource.
iii. Protecting the confidentiality of the resource.

The NAHC's PowerPoint presentation titled, “Tribal Consultation Under AB 52: Requirements and Best Practices" may be found online at: http://nahc.ca.gov/wp-content/uploads/2015/10/AB52TribalConsultation CalEPAPDF.pdf

Page 3 of 5 ends

7. Conclusion of Consultation: Consultation with a tribe shall be considered concluded when either of the following occurs:
a. The parties agree to measures to mitigate or avoid a significant effect, if a significant effect exists, on a tribal cultural resource; or
b. A party, acting in good faith and after reasonable effort, concludes that mutual agreement cannot be reached. {Pub. Resources Code §21080.3.2 (b)).

8. Recommending Mitigation Measures Agreed Upon in Consultation in_the Environmental Document: Any mitigation measures agreed upon in the consultation conducted pursuant to Public Resources Code §21080.3.2 shall be recommended for inclusion in the environmental document and in an adopted mitigation monitoring and reporting program, if determined to avoid or lessen the impact pursuant to Public Resources Code §21082.3, subdivision (b), paragraph 2, and shall be fully enforceable. (Pub. Resources Code §21082.3 (a).

9. Required Consideration of Feasible Mitigation: If mitigation measures recommended by the staff of the lead agency as a result of the consultation process are not included in the environmental document or if there are no agreed upon mitigation measures at the conclusion of consultation, or if consultation does not occur, and if substantial evidence demonstrates that a project will cause a significant effect to a tribal cultural resource, the lead agency shall consider feasibie mitigation pursuant to Public Resources Code §21084.3 (b). (Pub. Resources Code §21082.3 (e}).

10. Examples of Mitigation Measures That, If Feasible, May Be Considered to Avoid or Minimize Significant Adverse Impacts to Tribal Cultural Resources:
a. Avoidance and preservation of the resources in place, including, but not limited to:
i. Planning and construction to avoid the resources and protect the cultural and natural context.
ii. Planning greenspace, parks, or other open space, to incorporate the resources with culturally appropriate protection and management criteria.
b. Treating the resource with culturally appropriate dignity, taking into account the tribal cultural values and meaning of the resource, including, but not limited to, the following:
’ i. Protecting the cultural character and integrity of the resource. ii. Protecting the traditional use of the resource.
iii. Protecting the confidentiality of the resource.
c. Permanent conservation easements or other interests in real property, with culturally appropriate management criteria for the purposes of preserving or utilizing the resources or places. d. Protecting the resource. (Pub. Resource Code §21084.3 (b)). e. Please note that a federally recognized California Native American tribe or a non-federally recognized California Native American tribe that is on the contact list maintained by the NAHC to protect a California prehistoric, archaeological, cultural, spiritual, or ceremonial place may acquire and hold conservation easements if the conservation easement is voluntarily conveyed. (Civ. Code §815.3 (c}). f. Please note that it is the policy of the state that Native American remains and associated grave artifacts shall be repatriated. (Pub. Resources Code §5097.991).

11. Prerequisites for Certifying an Environmental impact Report or Adopting a Mitigated Negative Declaration or Negative Declaration with a Significant Impact on an Identified Tribal Cultural Resource: An Environmental Impact Report may not be certified, nor may a mitigated negative declaration or a negative declaration be adopted unless one of the following occurs:
a. The consultation process between the tribes and the lead agency has occurred as provided in Public Resources Code §21080.3.1 and §21080.3.2 and concluded pursuant to Public Resources Code §21080.3.2.
b. The tribe that requested consultation failed to provide comments to the lead agency or otherwise failed to engage in the consultation process.
c. The lead agency provided notice of the project to the tribe in compliance with Public Resources Code §21080.3.1 {d} and the tribe failed to request consultation within 30 days. (Pub. Resources Code §21082.3 (dj).

The NAHC's PowerPoint presentation titled, “Tribal Consultation Under AB 52: Requirements and Best Practices” may be found online at: hitp://nahc.ca.gov/wp-content/uploads/2015/10/AB52TribalConsultation CalEPAPDF.pdf

Page 3 of 5 ends

SB 18
Some of SB 18's provisions include:

2. No Statutory Time Limit on SB 18 Tribal Consultation. There is no statutory time limit on SB 18 tribal consultation. a. The parties to the consultation come to a mutual agreement concerning the appropriate measures NAHC Recommendations for Cultural Resources Assessments a. The final report containing site forms, site significance, and mitigation measures should be submitted

Page 4 of 5 ends

2. If an archaeological inventory survey is required, the final stage is the preparation of a professional report detailing the findings and recommendations of the records search and field survey.

Agencies should be aware that neither AB 52 nor SB 18 precludes agencies from initiating tribal consultation with tribes that are traditionally and culturally affiliated with their jurisdictions before the timeframes provided in AB 52 and SB 18. For that reason, we urge you to continue to request Native American Tribal Contact Lists and "Sacred Lands File" searches from the NAHC. The request forms can be found online at: http://nahc.ca.gov/resources/forms/. for preservation or mitigation; or
b. Either the local government or the tribe, acting in good faith and after reasonable effort, concludes that mutual agreement cannot be reached concerning the appropriate measures of preservation or mitigation. (Tribal Consultation Guidelines, Governor's Office of Planning and Research (2005) at p. 18).

1. Contact the appropriate regional California Historical Research Information System (CHRIS) Center (https://ohp.parks.ca.gov/?page_id=30331) for an archaeological records search. The records search will determine:

To adequately assess the existence and significance of tribal cultural resources and plan for avoidance, preservation in place, or barring both, mitigation of project-related impacts to tribal cultural resources, the NAHC recommends the following actions:
immediately to the planning department. All information regarding site locations, Native American human remains, and associated funerary objects should be in a separate confidential addendum and not be made available for public disclosure.
b. The final written report should be submitted within 3 months after work has been completed to the appropriate regional CHRIS center.

SB 18 applies to local governments and requires local governments to contact, provide notice to, refer plans to, and consult with tribes prior to the adoption or amendment of a general plan or a specific plan, or the designation of open space. (Gov. Code §65352.3). Local governments should consult the Governor’s Office of Planning and Research's "Tribal Consultation Guidelines," which can be found online at:
https://www.opr.ca.aov/docs/09 14 05 Updated Guidelines 922.pdf.

If part or all of the APE has been previously surveyed for cultural resources.

If any known cultural resources have already been recorded on or adjacent to the APE.

If the probability is low, moderate, or high that cultural resources are located in the APE.

If a survey is required to determine whether previously unrecorded cultural resources are present. a.
b.
c.
d.

1. Tribal Consultation: If a local government considers a proposal to adopt or amend a general plan or a specific plan, or to designate open space it is required to contact the appropriate tribes identified by the NAHC by requesting a “Tribal Consultation List.” If a tribe, once contacted, requests consultation the local government must consult with the tribe on the plan proposal. A tribe has 90 days from the date of receipt of notification to request consultation unless a shorter timeframe has been agreed to by the tribe. (Gov. Code §65352.3 (a)(2)).

3. Confidentiality: Consistent with the guidelines developed and adopted by the Office of Planning and Research pursuant to Gov. Code §65040.2. the city or county shall protect the confidentiality of the information concerning the specific identity, location, character, and use of places, features and objects described in Public Resources Code §5097.9 and §5097.993 that are within the city’s or county's jurisdiction. (Gov. Code §65352.3 (b)).

4. Conclusion of SB 18 Tribal Consultation: Consultation should be concluded at the point in which:

SB 18
SB 18 applies to local governments and requires local governments to contact, provide notice to, refer plans to, and consult with tribes prior to the adoption or amendment of a general plan or a specific plan, or the designation of open space. (Gov. Code §65352.3). Local governments should consult the Governor's Office of Planning and Research's “Tribal Consultation Guidelines,” which can be found online at:
https://www.opr.ca.gov/docs/09 14 05 Updated Guidelines 922.pdf.

Some of SB 18's provisions include:

1. Tribal Consultation: If a local government considers a proposal to adopt or amend a general plan or a specific plan, or to designate open space it is required to contact the appropriate tribes identified by the NAHC by requesting a “Tribal Consultation List.” If a tribe, once contacted, requests consultation the local government must consult with the tribe on the plan proposal. A tribe has 90 days from the date of receipt of notification to request consultation unless a shorter timeframe has been agreed to by the tribe. (Gov. Code §65352.3 (a)(2)).

2. No Statutory Time Limit on SB 18 Tribal Consultation. There is no statutory time limit on SB 18 tribal consultation.

3. Confidentiality: Consistent with the guidelines developed and adopted by the Office of Planning and Research pursuant to Gov. Code §65040.2, the city or county shall protect the confidentiality of the information concerning the specific identity, location, character, and use of places, features and objects described in Public Resources Code §5097.9 and §5097.993 that are within the city's or county's jurisdiction. (Gov. Code §65352.3 (b)).

4. Conclusion of SB 18 Tribal Consultation: Consultation should be concluded at the point in which:
a. The parties to the consultation come to a mutual agreement concerning the appropriate measures for preservation or mitigation; or
b. Either the local government or the tribe, acting in good faith and after reasonable effort, concludes that mutual agreement cannot be reached concerning the appropriate measures of preservation or mitigation. (Tribal Consultation Guidelines, Governor's Office of Planning and Research (2005) at p. 18).

Agencies should be aware that neither AB 52 nor SB 18 precludes agencies from initiating tribal consultation with tribes that are traditionally and culturally affiliated with their jurisdictions before the timeframes provided in AB 52 and SB 18. For that reason, we urge you to continue to request Native American Tribal Contact Lists and “Sacred Lands File” searches from the NAHC. The request forms can be found online at: hitp://nahc.ca.gov/resources/forms/.

NAHC Recommendations for Cultural Resources Assessments To adequately assess the existence and significance of tribal cultural resources and plan for avoidance, preservation in place, or barring both, mitigation of project-related impacts to tribal cultural resources, the NAHC recommends the following actions:

1. Contact the appropriate regional California Historical Research Information System (CHRIS) Center (https://ohp.parks.ca.gov/2page_id=30331) for an archaeological records search. The records search will determine:
a. If part or all of the APEhas been previously surveyed for cultural resources. b. If any known cultural resources have already been recorded on or adjacent to the APE. c. If the probability is low, moderate, or high that cultural resources are located in the APE. d. If a survey is required to determine whether previously unrecorded cultural resources are present.

2. If an archaeological inventory survey is required, the final stage is the preparation of a professional report detailing the findings and recommendations of the records search and field survey. a. The final report containing site forms, site significance, and mitigation measures should be submitted immediately to the planning department. All information regarding site locations, Native American human remains, and associated funerary objects should be in a separate confidential addendum and not be made available for public disclosure.
b. The final written report should be submitted within 3 months after work has been completed to the appropriate regional CHRIScenter.

Page 4 of 5 ends

3. Contact the NAHC for:
a. A Sacred Lands File search. Remember that tribes do not always record their sacred sites in the Sincerely,
cc: State Clearinghouse

Page 5 of 5 ends

Mathew Lin
Cultural Resources Analyst
Sacred Lands File, nor are they required to do so. A Sacred Lands File search is not a substitute for consultation with tribes that are traditionally and culturally affiliated with the geographic area of the project's APE.
b. A Native American Tribal Consultation List of appropriate tribes for consultation concerning the project site and to assist in planning for avoidance, preservation in place, or, failing both, mitigation measures.

If you have any questions or need additional information, please contact me at my email address:

[email protected].

4. Remember that the lack of surface evidence of archaeological resources (including tribal cultural resources) does not preclude their subsurface existence.
a. Lead agencies should include in their mitigation and monitoring reporting program plan provisions for the identification and evaluation of inadvertently discovered archaeological resources per Cal. Code Regs., tit. 14, § 15064.5(f) (CEQA Guidelines § 15064.5(f)). In areas of identified archaeological sensitivity, a certified archaeologist and a culturally affiliated Native American with knowledge of cultural resources should monitor all ground-disturbing activities.
b. Lead agencies should include in their mitigation and monitoring reporting program plans provisions for the disposition of recovered cultural items that are not burial associated in consultation with culturally affiliated Native Americans.
c. Lead agencies should include in their mitigation and monitoring reporting program plans provisions for the treatment and disposition of inadvertently discovered Native American human remains. Health and Safety Code §7050.5, Public Resources Code §5097.98, and Cal. Code Regs., tit. 14, §15064.5, subdivisions (d) and (e) (CEQA Guidelines §15064.5, subds. (d) and (e)) address the processes to be followed in the event of an inadvertent discovery of any Native American human remains and associated grave goods in a location other than a dedicated cemetery.

3. Contact the NAHC for:
a. A Sacred Lands File search. Remember that tribes do not diways record their sacred sites in the Sacred Lands File, nor are they required to do so. A Sacred Lands File search is not a substitute for consultation with tribes that are traditionally and culturally affiiated with the geographic area of the project's APE.
b. A Native American Tribal Consultation List of appropriate tribes for consultation concerning the project site and to assist in planning for avoidance, preservation in place, or, failing both, mitigation measures.

4. Remember that the lack of surface evidence of archaeological resources (including tribal cultural resources) does not preclude their subsurface existence.
a. lead agencies should include in their mitigation and monitoring reporting program plan provisions for the identification and evaluation of inadvertently discovered archaeological resources per Cal. Code Regs., tit. 14, §15064.5(f) (CEQA Guidelines §15064.5(f}). In areas of identified archaeological sensitivity, a certified archaeologist and a culturally affiliated Native American with knowledge of cultural resources should monitor all ground-disturbing activities.
b. lead agencies should include in their mitigation and monitoring reporting program plans provisions for the disposition of recovered cultural items that are not burial associated in consultation with culturally affiliated Native Americans.
¢. lead agencies should include in their mitigation and monitoring reporting program plans provisions for the treatment and disposition of inadvertently discovered Native American human remains. Health and Safety Code §7050.5, Public Resources Code §5097.98, and Cal. Code Regs., tit. 14, §15064.5, subdivisions (d) and (e) (CEQA Guidelines §15064.5, subds. (d) and (e)) address the processes to be followed in the everit of an inadvertent discovery of any Native American human remains and associated grave goods in a location other than a dedicated cemetery.

If you have any questions or need additional information, please contact me at my email address:

Mathew. [email protected].

Sincerely,
Mathew Lin
Cultural Resources Analyst
cc: State Clearinghouse

Page 50 ends

TM HEALTHY AIR LIV
November 25, 2025
District CEQA Reference No: 20251287
Dear Ms. Knight:

The District offers the following comments at this time regarding the Project:
1) Project Related Emissions
www.valleyair.org www.healthyairliving.com Printed on recycled paper. w9 K San Joaquin Valley

AIR POLLUTION CONTROL DISTRICT
The District’s initial review of the Project concludes that emissions resulting from construction and/or operation of the Project may exceed any of the following significance thresholds as identified in the District’s Guidance for Assessing and Mitigating Air Quality Impacts: https://ww2.vallevair.orq/media/q4nl3p0q/qamaqi.pdf.

Ashley Knight
City of Bakersfield
Development Services Department - Planning Division
1715 Chester Avenue, 2nd Floor
Bakersfield, CA 93301
At the federal level under the National Ambient Air Quality Standards (NAAQS), the District is designated as extreme nonattainment for the 8-hour ozone standards and serious nonattainment for the particulate matter less than 2.5 microns in size (PM2.5) standards. At the state level under California Ambient Air Quality Standards (CAAQS), the District is designated as nonattainment for the 8-hour ozone, PM 10, and PM2.5 standards.

Southern Region
34946 Flyover Court
Bakersfield, CA 93308-9725
Tel: (661) 392-5500 FAX: 1661) 392-5585
The San Joaquin Valley Air Pollution Control District (District) has reviewed the Notice of Preparation (NOP) from the City of Bakersfield (City) for the project mentioned above.

Per the NOP, the project consists of a 405,531 square foot commercial retail center which includes markets, retail uses, storage uses, health club, medical office, drive through fast food restaurants, car wash, and a gas station (Project). The Project is located on the south west corner of Rosedale Highway and Coffee Road in Bakersfield, CA 93312. (APN: 368-010-05).

Northern Region
4800 Enterprise Way
Modesto, CA 95356-8718
Tel: 1209) 557-6400 FAX: (209) 557-6475
Central Region (Main Office)
1990 E. Gettysburg Avenue
Fresno, CA 93726-0244
Tel: (559) 230-6000 FAX: (559) 230-6061
Samir Sheikh
Executive Director/Air Pollution Control Officer
Project: Notice of Preparation of an Environmental Impact Report for Riverview Market Commercial Project
SanJoaquinValle HEY
% AIRon old 2lley HEALTHYAIR LIVING
November 25, 2025
Ashley Knight
City of Bakersfield
Development Services Department — Planning Division
1715 Chester Avenue, 2" Floor
Bakersfield, CA 93301
Project: Notice of Preparation of an Environmental Impact Report for Riverview Market Commercial Project
District CEQA Reference No: 20251287
Dear Ms. Knight:

The San Joaquin Valley Air Pollution Control District (District) has reviewed the Notice of Preparation (NOP) from the City of Bakersfield (City) for the project mentioned above.

Per the NOP, the project consists of a 405,531 square foot commercial retail center which includes markets, retail uses, storage uses, health club, medical office, drive through fast food restaurants, car wash, and a gas station (Project). The Project is located on the south west corner of Rosedale Highway and Coffee Road in Bakersfield, CA 93312. (APN: 368-010-05).

The District offers the following comments at this time regarding the Project:
1) Project Related Emissions
At the federal level under the National Ambient Air Quality Standards (NAAQS), the District is designated as extreme nonattainment for the 8-hour ozone standards and serious nonattainment for the particulate matter less than 2.5 microns in size (PM2.5) standards. At the state level under California Ambient Air Quality Standards (CAAQS), the District is designated as nonattainment for the 8-hour ozone, PM10, and PM2.5 standards.

The District's initial review of the Project concludes that emissions resulting from construction and/or operation of the Project may exceed any of the following significance thresholds as identified in the District's Guidance for Assessing and Mitigating Air Quality Impacts: https://ww2.valleyair.org/media/g4nl3p0g/gamaaqi.pdf.

Samir Sheikh
ExecutiveDirector/AirPollutionControlOfficer
Northern Region Central Region(Main Office) SouthernRegion 4800EnterpriseWay 1890E.GettysburgAvenue 34946Flyover Court Modesto,CA95356-8718 Fresno,CA93726-0244 Bakersfield,CA83308-8725 Tel:(208)557-6400 FAX:(208)557-8475 Tel:(558)230-6000 FAX:(558)230-6061 Tel:(661)382-5500 FAX:(661)392-5585 www.valleyair.org www.healthyairfiving.com NU.

Page 2 of 12 ends

1a) Construction Emissions
1b) Operational Emissions
1c) Project Trip Length for HHD Truck Travel
1d) Recommended Model for Quantifying Air Emissions
The District recommends that a more detailed preliminary review of the Project be conducted for the Project’s construction and operational emissions.

Project-related criteria pollutant emissions from construction and operational sources should be identified and quantified. Emissions analysis should be performed using the California Emission Estimator Model (CalEEMod), which uses the most recent CARB-approved version of relevant emissions models and emission factors. CalEEMod is available to the public and can be downloaded from the CalEEMod website at: www.caleemod.com.

San Joaquin Valley Air Pollution Control District
District Reference No: 20251287
November 25, 2025
The District recommends, to reduce impacts from construction-related diesel exhaust emissions, the Project should utilize the cleanest available off-road construction equipment.

Operational (ongoing) air emissions from mobile sources and stationary sources should be analyzed separately. For reference, the District’s significance thresholds are identified in the District’s Guidance for Assessing and Mitigating Air Quality Impacts:
https://ww2.valleyair.org/media/q4nl3p0q/qamaqi.pdf.

Recommended Mitigation Measure: At a minimum, project related impacts on air quality should be reduced to levels below the District’s significance thresholds through incorporation of design elements such as the use of cleaner Heavy Heavy-Duty (HHD) trucks and vehicles, measures that reduce Vehicle Miles Traveled (VMTs), and measures that increase energy efficiency. More information on transportation mitigation measures can be found at:
https://ww2.valleyair.org/media/ob0pweru/clean-air-measures.pdf The City’s environmental review should adequately characterize and justify an appropriate trip length distance for off-site HHD truck travel to and from the Project site. Based on the following factors: 1) the Project consists of a commercial retail center that has the potential to generate a high volume of HHD truck trips, and 2) HHD trucks generally travel further distances for distribution. The District recommends the environmental review include a discussion characterizing an appropriate trip length distance for HHD truck travel, and reflect such appropriate distance supported by project-specific factors.

San Joaquin Valley AirPollution Control District Page 2 of 12 District Reference No: 20251287
November 25, 2025
The District recommends that a more detailed preliminary review of the Project be conducted for the Project's construction and operational emissions. 1a) Construction Emissions
The District recommends, to reduce impacts from construction-related diesel exhaust emissions, the Project should utilize the cleanest available off-road construction equipment.
1b) Operational Emissions
Operational (ongoing) air emissions from mobile sources and stationary sources should be analyzed separately. For reference, the District's significance thresholds are identified in the District's Guidance for Assessing and Mitigating Air Quality Impacts:
https://ww2.valleyair.org/media/g4nl3p0g/gamaaqi.pdf.

Recommended Mitigation Measure: At a minimum, project related impacts on air quality should be reduced to levels below the District's significance thresholds through incorporation of design elements such as the use of cleaner Heavy Heavy-Duty (HHD) trucks and vehicles, measures that reduce Vehicle Miles Traveled (VMTs), and measures that increase energy efficiency. More information on transportation mitigation measures can be found at:
https://ww2.valleyair.org/media/obOpweru/clean-air-measures.pdf 1c) Project Trip Length for HHD Truck Travel
The City’s environmental review should adequately characterize and justify an appropriate trip length distance for off-site HHD truck travel to and from the Project site. Based on the following factors: 1) the Project consists of a commercial retail center that has the potential to generate a high volume of HHD truck trips, and 2) HHD trucks generally travel further distances for distribution. The District recommends the environmental review include a discussion characterizing an appropriate trip length distance for HHD truck travel, and reflect such appropriate distance supported by project-specific factors.
1d) Recommended Model for Quantifying Air Emissions
Project-related criteria pollutant emissions from construction and operational sources should be identified and quantified. Emissions analysis should be performed using the California Emission Estimator Model (CalEEMod), which uses the most recent CARB-approved version of relevant emissions models and emission factors. CalEEMod is available to the public and can be downloaded from the CalEEMod website at: www.caleemod.com.

Page 3 of 12 ends

2) Health Risk Screening/Assessment
A project with a significant health risk would trigger all feasible mitigation measures.

San Joaquin Valley Air Pollution Control District
District Reference No: 20251287
November 25, 2025
Prioritization (Screening Health Risk Assessment):

A “Prioritization” is the recommended method for a conservative screening-level health risk assessment. The Prioritization should be performed using the California Air Pollution Control Officers Association’s (CAPCOA) methodology. Please contact the District for assistance with performing a Prioritization analysis.

The District recommends that a more refined analysis, in the form of an HRA, be performed for any project resulting in a Prioritization score of 10 or greater. This is because the prioritization results are a conservative health risk representation, while the detailed HRA provides a more accurate health risk evaluation.

To determine potential health impacts on surrounding receptors (residences, businesses, hospitals, day-care facilities, health care facilities, etc.) a Prioritization and/or a Health Risk Assessment (HRA) should be performed for the Project. These health risk determinations should quantify and characterize potential Toxic Air Contaminants (TACs) identified by the Office of Environmental Health Hazard Assessment/California Air Resources Board (OEHHA/CARB) that pose a present or potential hazard to human health.

The City should evaluate the risk associated with the Project for sensitive receptors (residences, businesses, hospitals, day-care facilities, health care facilities, etc.) in the area and mitigate any potentially significant risk to help limit exposure of sensitive receptors to emissions.

Health risk analyses should include all potential air emissions from the project, which include emissions from construction of the project, including multi-year construction, as well as ongoing operational activities of the project. Note, two common sources of TACs can be attributed to diesel exhaust emitted from heavy-duty off-road earth moving equipment during construction, and from ongoing operation of heavy-duty on-road trucks.

A development project would be considered to have a potentially significant health risk if the HRA demonstrates that the health impacts would exceed the District’s established risk thresholds, which can be found here:
https://ww2.valleyair.org/permittinq/ceqa/.

Health Risk Assessment:

Prior to performing an HRA, it is strongly recommended that land use agencies/ project proponents develop and submit for District review a health risk modeling protocol that outlines the sources and methodologies that will be used to perform the HRA.

San Joaquin Valley AirPollution Control District Page 3 of 12 District Reference No: 20251287
November 25, 2025
2) Health Risk Screening/Assessment
The City should evaluate the risk associated with the Project for sensitive receptors (residences, businesses, hospitals, day-care facilities, health care facilities, etc.) in the area and mitigate any potentially significant risk to help limit exposure of sensitive receptors to emissions.

To determine potential health impacts on surrounding receptors (residences, businesses, hospitals, day-care facilities, health care facilities, etc.) a Prioritization and/or a Health Risk Assessment (HRA) should be performed for the Project. These health risk determinations should quantify and characterize potential Toxic Air Contaminants (TACs) identified by the Office of Environmental Health Hazard Assessment/California Air Resources Board (OEHHA/CARB) that pose a present or potential hazard to human health.

Health risk analyses should include all potential air emissions from the project, which include emissions from construction of the project, including multi-year construction, as well as ongoing operational activities of the project. Note, two common sources of TACs can be attributed to diesel exhaust emitted from heavy-duty off-road earth moving equipment during construction, and from ongoing operation of heavy-duty on-road trucks.

Prioritization (Screening Health Risk Assessment):

A “Prioritization” is the recommended method for a conservative screening-level health risk assessment. The Prioritization should be performed using the California Air Pollution Control Officers Association’s (CAPCOA) methodology. Please contact the District for assistance with performing a Prioritization analysis.

The District recommends that a more refined analysis, in the form of an HRA, be performed for any project resulting in a Prioritization score of 10 or greater. This is because the prioritization results are a conservative health risk representation, while the detailed HRA provides a more accurate health risk evaluation.

Health Risk Assessment:

Prior to performing an HRA, it is strongly recommended that land use agencies/ project proponents develop and submit for District review a health risk modeling protocol that outlines the sources and methodologies that will be used to perform the HRA.

A development project would be considered to have a potentially significant health risk if the HRA demonstrates that the health impacts would exceed the District's established risk thresholds, which can be found here:
hitps://ww2.valleyair.org/permitting/ceqal.

A project with a significant health risk would trigger all feasible mitigation measures.

Page 4 of 12 ends

For assistance, please contact the District’s Technical Services Department by:
3) Ambient Air Quality Analysis
An Ambient Air Quality Analysis (AAQA) uses air dispersion modeling to determine if emissions increases from a project will cause or contribute to a violation of State or National Ambient Air Quality Standards. The District recommends an AAQA be performed for the Project if emissions exceed 100 pounds per day of any pollutant.

The District is available to review HRA protocols and analyses. For HRA submittals please provide the following information electronically to the District for review:

San Joaquin Valley Air Pollution Control District
District Reference No: 20251287
November 25, 2025
Recommended Measure. Development projects resulting in TAC emissions should be located an adequate distance from residential areas and other sensitive receptors to prevent the creation of a significant health risk in accordance to CARB's Air Quality and Land Use Handbook: A Community Health Perspective located at https://ww2.arb.ca.gov/our-work/programs/resource-center/strategy-development/land-use-resources.

The District strongly recommends that development projects that result in a significant health risk not be approved by the land use agency.

Specific information for assessing significance, including screening tools and modeling guidance, is available online at the District’s website:
https://ww2.valleyair.org/permitting/cega/.

An AAQA uses air dispersion modeling to determine if emission increase from a project will cause or contribute to a violation of State or National Ambien Air Quality Standards. An acceptable analysis would include emissions from both project-specific permitted and non-permitted equipment and activities. The District recommends consultation with District staff to determine the appropriate model and input data to use in the analysis.
• E-Mailing inquiries to: [email protected]
• Calling (559) 230-5900
• HRA (AERMOD) modeling files
• HARP2 files
• Summary of emissions source locations, emissions rates, and emission factor calculations and methodologies.

San Joaquin Valley AirPollution Control District Page 4 of 12 District Reference No: 20251287
November 25, 2025
3)
The District strongly recommends that development projects that result in a significant health risk not be approved by the land use agency.

The District is available to review HRA protocols and analyses. For HRA submittals please provide the following information electronically to the District for review:
eo HRA (AERMOD) modeling files
¢ HARP2 files
es Summary of emissions source locations, emissions rates, and emission factor calculations and methodologies.

For assistance, please contact the District's Technical Services Department by:
e E-Mailing inquiries to: [email protected]
e Calling (559) 230-5900
Recommended Measure: Development projects resulting in TAC emissions should be located an adequate distance from residential areas and other sensitive receptors to prevent the creation of a significant health risk in accordance to CARB's Air Quality and Land Use Handbook: A Community Health Perspective located at hitps://ww2.arb.ca.gov/our-work/programs/resource-center/strategy-development/land-use-resources.

Ambient Air Quality Analysis
An Ambient Air Quality Analysis (AAQA) uses air dispersion modeling to determine if emissions increases from a project will cause or contribute to a violation of State or National Ambient Air Quality Standards. The District recommends an AAQA be performed for the Project if emissions exceed 100 pounds per day of any pollutant.

An AAQA uses air dispersion modeling to determine if emission increase from a project will cause or contribute to a violation of State or National Ambien Air Quality Standards. An acceptable analysis would include emissions from both project-specific permitted and non-permitted equipment and activities. The District recommends consultation with District staff to determine the appropriate model and input data to use in the analysis.

Specific information for assessing significance, including screening tools and modeling guidance, is available online at the District's website:
https://ww2.valleyair.org/permitting/ceqa/.

Page 5 of 12 ends

4) Voluntary Emission Reduction Agreement
5) Truck Routing
Criteria pollutant emissions may result in emissions exceeding the District’s significance thresholds, potentially resulting in a significant impact on air quality.

When a project is expected to have a significant impact, the District recommends the Environmental Impact Report (EIR) also include a discussion on the feasibility of implementing a Voluntary Emission Reduction Agreement (VERA) for this Project.

San Joaquin Valley Air Pollution Control District
District Reference No: 20251287
November 25, 2025
Truck routing involves the assessment of which roads Heavy Heavy-Duty (HHD) trucks take to and from their destination, and the emissions impact that the HHD trucks may have on residential communities and sensitive receptors. Since the Project consists of a commercial retail center, the Project has the potential to generate HHD truck trips.

A VERA is a mitigation measure by which the project proponent provides pound-for-pound mitigation of emissions increases through a process that develops, funds, and implements emission reduction projects, with the District serving a role of administrator of the emissions reduction projects and verifier of the successful mitigation effort. To implement a VERA, the project proponent and the District enter into a contractual agreement in which the project proponent agrees to mitigate project specific emissions by providing funds for the District’s incentives programs.

The funds are disbursed by the District in the form of grants for projects that achieve emission reductions. Thus, project-related impacts on air quality can be mitigated.

Types of emission reduction projects that have been funded in the past include electrification of stationary internal combustion engines (such as agricultural irrigation pumps), replacing old heavy-duty trucks with new, cleaner, more efficient heavy-duty trucks, and replacement of agricultural equipment with the latest generation technologies.

In implementing a VERA, the District verifies the actual emission reductions that have been achieved as a result of completed grant contracts, monitors the emission reduction projects, and ensures the enforceability of achieved reductions. After the project is mitigated, the District certifies to the Lead Agency that the mitigation is completed, providing the Lead Agency with an enforceable mitigation measure demonstrating that project-related emissions have been mitigated. To assist the Lead Agency and project proponent in ensuring that the environmental document is compliant with CEQA, the District recommends the environmental document includes an assessment of the feasibility of implementing a VERA.

The District recommends the City evaluate HHD truck routing patterns for the Project, with the aim of limiting exposure of residential communities and sensitive receptors to emissions. This evaluation would consider the current truck routes, the quantity and type of each truck (e.g., Medium Heavy-Duty, HHD, etc.), the San Joaquin Valley AirPollution Control District Page 5 of 12 District Reference No: 20251287
November 25, 2025
4)
5)
Voluntary Emission Reduction Agreement
Criteria pollutant emissions may result in emissions exceeding the District's significance thresholds, potentially resulting in a significant impact on air quality.

When a project is expected to have a significant impact, the District recommends the Environmental Impact Report (EIR) also include a discussion on the feasibility of implementing a Voluntary Emission Reduction Agreement (VERA) for this Project.

A VERA is a mitigation measure by which the project proponent provides pound-for-pound mitigation of emissions increases through a process that develops, funds, and implements emission reduction projects, with the District serving a role of administrator of the emissions reduction projects and verifier of the successful mitigation effort. To implement a VERA, the project proponent and the District enter into a contractual agreement in which the project proponent agrees to mitigate project specific emissions by providing funds for the District's incentives programs.

The funds are disbursed by the District in the form of grants for projects that achieve emission reductions. Thus, project-related impacts on air quality can be mitigated.

Types of emission reduction projects that have been funded in the past include electrification of stationary internal combustion engines (such as agricultural irrigation pumps), replacing old heavy-duty trucks with new, cleaner, more efficient heavy-duty trucks, and replacement of agricultural equipment with the latest generation technologies.

In implementing a VERA, the District verifies the actual emission reductions that have been achieved as a result of completed grant contracts, monitors the emission reduction projects, and ensures the enforceability of achieved reductions. After the project is mitigated, the District certifies to the Lead Agency that the mitigation is completed, providing the Lead Agency with an enforceable mitigation measure demonstrating that project-related emissions have been mitigated. To assist the Lead Agency and project proponent in ensuring that the environmental document is compliant with CEQA, the District recommends the environmental document includes an assessment of the feasibility of implementing a VERA.

Truck Routing
Truck routing involves the assessment of which roads Heavy Heavy-Duty (HHD) trucks take to and from their destination, and the emissions impact that the HHD trucks may have on residential communities and sensitive receptors. Since the Project consists of a commercial retail center, the Project has the potential to generate HHD truck trips.

The District recommends the City evaluate HHD truck routing patterns for the Project, with the aim of limiting exposure of residential communities and sensitive receptors to emissions. This evaluation would consider the current truck routes, the quantity and type of each truck (e.g., Medium Heavy-Duty, HHD, etc.), the

Page 6 of 12 ends

6) Cleanest Available Heavy-Duty Trucks
7) Reduce Idling of Heavy-Duty Trucks
8) Under-fired Charbroilers
Since the cooking of meat can release carcinogenic PM2.5 species, such as polycyclic aromatic hydrocarbons, controlling emissions from new under-fired • Recommended Measure: Fleets associated with operational activities utilize the cleanest available HHD trucks, including zero and near-zero technologies.

San Joaquin Valley Air Pollution Control District
District Reference No: 20251287
November 25, 2025
The Project may have restaurants with under-fired charbroilers. Such charbroilers may pose the potential for immediate health risk, particularly when located in densely populated areas or near sensitive receptors.

The goal of this strategy is to limit the potential for localized PM2.5 and toxic air contaminant impacts associated with the idling of Heavy-Duty trucks. The diesel exhaust from idling has the potential to impose significant adverse health and environmental impacts.

The San Joaquin Valley will not be able to attain stringent health-based federal air quality standards without significant reductions in emissions from HHD trucks, the single largest source of NOx emissions in the San Joaquin Valley. Accordingly, to meet federal air quality attainment standards, the District’s ozone and particulate matter attainment plans rely on a significant and rapid transition of HHD fleets to zero or near-zero emissions technologies.
destination and origin of each trip, traffic volume correlation with the time of day or the day of the week, overall Vehicle Miles Traveled (VMT), and associated exhaust emissions. The truck routing evaluation would also identify alternative truck routes and their impacts on VMT and air quality.

Since the Project has the potential to generate HHD truck trips, the District recommends the EIR include measures to ensure compliance of the state anti-idling regulation (13 CCR § 2485 and 13 CCR § 2480) and discuss the importance of limiting the amount of idling, especially near sensitive receptors.

The Project consists of a commercial retail center, the Project has the potential to generate HHD truck trips. Since the Project may exceed the District significance thresholds, the District recommends that the following measures be considered by the City to reduce Project-related operational emissions:
• Recommended Measure: All on-site service equipment (cargo handling, yard hostlers, forklifts, pallet jacks, etc.) utilize zero-emissions technologies.

San Joaquin Valley AirPollution Control District Page 6 of 12 District Reference No: 20251287
November 25, 2025
6)
7)
8)
destination and origin of each trip, traffic volume correlation with the time of day or the day of the week, overall Vehicle Miles Traveled (VMT), and associated exhaust emissions. The truck routing evaluation would also identify alternative truck routes and their impacts on VMT and air quality.

Cleanest Available Heavy-Duty Trucks
The San Joaquin Valley will not be able to attain stringent health-based federal air quality standards without significant reductions in emissions from HHD trucks, the single largest source of NOx emissions in the San Joaquin Valley. Accordingly, to meet federal air quality attainment standards, the District's ozone and particulate matter attainment plans rely on a significant and rapid transition of HHD fleets to zero or near-zero emissions technologies.

The Project consists of a commercial retail center, the Project has the potential to generate HHD truck trips. Since the Project may exceed the District significance thresholds, the District recommends that the following measures be considered by the City to reduce Project-related operational emissions:
e Recommended Measure: Fleets associated with operational activities utilize the cleanest available HHD trucks, including zero and near-zero technologies. eo Recommended Measure: All on-site service equipment (cargo handling, yard hostlers, forklifts, pallet jacks, etc.) utilize zero-emissions technologies.

Reduce Idling of Heavy-Duty Trucks
The goal of this strategy is to limit the potential for localized PM2.5 and toxic air contaminant impacts associated with the idling of Heavy-Duty trucks. The diesel exhaust from idling has the potential to impose significant adverse health and environmental impacts.

Since the Project has the potential to generate HHD truck trips, the District recommends the EIR include measures to ensure compliance of the state anti-idling regulation (13 CCR § 2485 and 13 CCR § 2480) and discuss the importance of limiting the amount of idling, especially near sensitive receptors.

Under-fired Charbroilers
The Project may have restaurants with under-fired charbroilers. Such charbroilers may pose the potential for immediate health risk, particularly when located in densely populated areas or near sensitive receptors.

Since the cooking of meat can release carcinogenic PM2.5 species, such as polycyclic aromatic hydrocarbons, controlling emissions from new under-fired

Page 7 of 12 ends

9) Vegetative Barriers and Urban Greening
10)On-Site Solar Deployment
It is the policy of the State of California that renewable energy resources and zero-carbon resources supply 100% of retail sales of electricity to California end-use customers by December 31,2045. While various emission control techniques and programs exist to reduce air quality emissions from mobile and stationary sources, the production of solar energy is contributing to improving air quality and public San Joaquin Valley Air Pollution Control District
District Reference No: 20251287
November 25, 2025
The District is available to assist the City and project proponents with this assessment. Additionally, the District is currently offering substantial incentive funding that covers the full cost of purchasing, installing, and maintaining the system during a demonstration period covering two years of operation. Please contact the District at (559) 230-5800 or [email protected] for more information, or visit:
https://ww2.valleyair.org/qrants/restaurant-charbroiler-technoloqv-partnership/ Furthermore, reducing commercial charbroiling emissions is essential to achieving attainment of multiple federal PM2.5 standards. Therefore, the District recommends that the EIR include a measure requiring the assessment and potential installation, as technologically feasible, of particulate matter emission control systems for new large restaurants operating under-fired charbroilers.

While various emission control techniques and programs exist to reduce air quality emissions from mobile and stationary sources, vegetative barriers have been shown to be an additional measure to potentially reduce a population’s exposure to air pollution through the interception of airborne particles and the update of gaseous pollutants. Examples of vegetative barriers include, but are not limited to the following: trees, bushes, shrubs, or a mix of these. Generally, a higher and thicker vegetative barrier with full coverage will result in greater reductions in downwind pollutant concentrations. In the same manner, urban greening is also a way to help improve air quality and public health in addition to enhancing the overall beautification of a community with drought tolerant, low-maintenance greenery. charbroilers will have a substantial positive impact on public health. The air quality impacts on neighborhoods near restaurants with under-fired charbroilers can be significant on days when meteorological conditions are stable, when dispersion is limited and emissions are trapped near the surface within the surrounding neighborhoods. This potential for neighborhood-level concentration of emissions during evening or multi-day stagnation events raises air quality concerns.

There are single family residential units located south west of the Project. The District suggests the City consider the feasibility of incorporating vegetative barriers and urban greening as a measure to further reduce air pollution exposure on sensitive receptors (e.g., residential units).

San Joaquin Valley AirPollution Control District Page 7 of 12 District Reference No: 20251287
November 25, 2025
charbroilers will have a substantial positive impact on public health. The air quality impacts on neighborhoods near restaurants with under-fired charbroilers can be significant on days when meteorological conditions are stable, when dispersion is limited and emissions are trapped near the surface within the surrounding neighborhoods. This potential for neighborhood-level concentration of emissions during evening or multi-day stagnation events raises air quality concerns.

Furthermore, reducing commercial charbroiling emissions is essential to achieving attainment of multiple federal PM2.5 standards. Therefore, the District recommends that the EIR include a measure requiring the assessment and potential installation, as technologically feasible, of particulate matter emission control systems for new large restaurants operating under-fired charbroilers.

The District is available to assist the City and project proponents with this assessment. Additionally, the District is currently offering substantial incentive funding that covers the full cost of purchasing, installing, and maintaining the system during a demonstration period covering two years of operation. Please contact the District at (559) 230-5800 or [email protected] for more information, or visit:
https://ww2.valleyair.org/grants/restaurant-charbroiler-technology-partnership/ 9) Vegetative Barriers and Urban Greening
There are single family residential units located south west of the Project. The District suggests the City consider the feasibility of incorporating vegetative barriers and urban greening as a measure to further reduce air pollution exposure on sensitive receptors (e.g., residential units).

While various emission control techniques and programs exist to reduce air quality emissions from mobile and stationary sources, vegetative barriers have been shown to be an additional measure to potentially reduce a population’s exposure to air pollution through the interception of airborne particles and the update of gaseous pollutants. Examples of vegetative barriers include, but are not limited to the following: trees, bushes, shrubs, or a mix of these. Generally, a higher and thicker vegetative barrier with full coverage will result in greater reductions in downwind pollutant concentrations. In the same manner, urban greening is also a way to help improve air quality and public health in addition to enhancing the overall beautification of a community with drought tolerant, low-maintenance greenery. 10)On-Site Solar Deployment
It is the policy of the State of California that renewable energy resources and zero-carbon resources supply 100% of retail sales of electricity to California end-use customers by December 31, 2045. While various emission control techniques and programs exist to reduce air quality emissions from mobile and stationary sources, the production of solar energy is contributing to improving air quality and public

Page 8 of 12 ends

11)Electric Infrastructure
Please visit https://ww2.vallevair.org/qrants/charqe-up for more information. 12)Nuisance Odors
13)District Rules and Regulations
San Joaquin Valley Air Pollution Control District
District Reference No: 20251287
November 25, 2025
The District recommends that the City require all nonresidential buildings be designed to provide electric infrastructure to support the use of on-road zero emissions vehicles, such as Medium-Heavy Duty trucks and HHD trucks associated with a commercial project.

While offensive odors rarely cause any physical harm, they can be unpleasant, leading to considerable distress among the public and often resulting in citizen complaints.

The District issues permits for many types of air pollution sources, and regulates some activities that do not require permits. A project subject to District rules and regulations would reduce its impacts on air quality through compliance with the District’s regulatory framework. In general, a regulation is a collection of individual rules, each of which deals with a specific topic. As an example, Regulation II (Permits) includes District Rule 2010 (Permits Required), Rule 2201 (New and Modified Stationary Source Review), Rule 2520 (Federally Mandated Operating Permits), and several other rules pertaining to District permitting requirements and processes.

The City should consider all available pertinent information to determine if the Project could have a significant impact related to nuisance odors. Nuisance odors may be assessed qualitatively taking into consideration the proposed business or industry type and its potential to create odors, as well as proximity to off-site receptors that potentially would be exposed to objectionable odors. The intensity of an odor source’s operations and its proximity to receptors influences the potential significance of malodorous emissions. Any project with the potential to frequently expose members of the public to objectionable odors should be deemed to have a significant impact.

According to the District Guidance for Assessing and Mitigating air Quality Impacts (GAMAQI), a significant odor impact is defined as more than one confirmed complaint per year averaged over a three-year period, or three unconfirmed complaints per year averaged over a three-year period. An unconfirmed complaint means that either the odor or air contaminant release could not be detected, or the source of the odor could not be determined.
health. The District suggests that the City consider incorporating solar power systems as an emission reduction strategy for the Project.

San Joaquin Valley AirPollution Control District Page 8 of 12 District Reference No: 20251287
November 25, 2025
health. The District suggests that the City consider incorporating solar power systems as an emission reduction strategy for the Project. 11)Electric Infrastructure
The District recommends that the City require all nonresidential buildings be designed to provide electric infrastructure to support the use of on-road zero emissions vehicles, such as Medium-Heavy Duty trucks and HHD trucks associated with a commercial project.

Please visit https://ww2.valleyair.org/grants/charge-up for more information. 12)Nuisance Odors
While offensive odors rarely cause any physical harm, they can be unpleasant, leading to considerable distress among the public and often resulting in citizen complaints.

The City should consider all available pertinent information to determine if the Project could have a significant impact related to nuisance odors. Nuisance odors may be assessed qualitatively taking into consideration the proposed business or industry type and its potential to create odors, as well as proximity to off-site receptors that potentially would be exposed to objectionable odors. The intensity of an odor source’s operations and its proximity to receptors influences the potential significance of malodorous emissions. Any project with the potential to frequently expose members of the public to objectionable odors should be deemed to have a significant impact.

According to the District Guidance for Assessing and Mitigating air Quality Impacts (GAMAQ), a significant odor impact is defined as more than one confirmed complaint per year averaged over a three-year period, or three unconfirmed complaints per year averaged over a three-year period. An unconfirmed complaint means that either the odor or air contaminant release could not be detected, or the source of the odor could not be determined.
13)District Rules and Regulations
The District issues permits for many types of air pollution sources, and regulates some activities that do not require permits. A project subject to District rules and regulations would reduce its impacts on air quality through compliance with the District's regulatory framework. In general, a regulation is a collection of individual rules, each of which deals with a specific topic. As an example, Regulation II (Permits) includes District Rule 2010 (Permits Required), Rule 2201 (New and Modified Stationary Source Review), Rule 2520 (Federally Mandated Operating Permits), and several other rules pertaining to District permitting requirements and processes.

Page 9 of 12 ends

13b) District Rule 9510 - Indirect Source Review (ISR)
Per Section 5.0 of the ISR Rule, an Air Impact Assessment (AIA) application is required to be submitted no later than applying for project-level approval from a public agency. As of the date of this letter, the District has not received an AIA application for this Project. Please immediately submit an AIA application to the This Project may be subject to District Rule 2010 (Permits Required) and Rule 2201 (New and Modified Stationary Source Review) and may require District permits. Prior to construction, the Project proponent should submit to the District an application for an ATC. For further information or assistance, the project proponent may contact the District’s SBA Office at (661) 392-5665.

San Joaquin Valley Air Pollution Control District
District Reference No: 20251287
November 25, 2025
The Project is subject to District Rule 9510 because it will receive a project-level discretionary approval from a public agency and will equal or exceed 9,000 square feet of development space.

The list of rules below is neither exhaustive nor exclusive. Current District rules can be found online at: https://ww2.valleyair.org/rules-and-planninq/current-district-rules-and-regulations. To identify other District rules or regulations that apply to future projects, or to obtain information about District permit requirements, the project proponents are strongly encouraged to contact the District’s Small Business Assistance (SBA) Office at (661) 392-5665.

The purpose of District Rule 9510 is to reduce the growth in both NOx and PM emissions associated with development and transportation projects from mobile and area sources; specifically, the emissions associated with the construction and subsequent operation of development projects. The ISR Rule requires developers to mitigate their NOx and PM emissions by incorporating clean air design elements into their projects. Should the proposed development project clean air design elements be insufficient to meet the required emission reductions, developers must pay a fee that ultimately funds incentive projects to achieve off-site emissions reductions.

Stationary Source emissions include any building, structure, facility, or installation which emits or may emit any affected pollutant directly or as a fugitive emission. District Rule 2010 (Permits Required) requires operators of emission sources to obtain an Authority to Construct (ATC) and Permit to Operate (PTO) from the District. District Rule 2201 (New and Modified Stationary Source Review) requires that new and modified stationary sources of emissions mitigate their emissions using Best Available Control Technology (BACT).
13a) District Rules 2010 and 2201 - Air Quality Permitting for Stationary Sources
San Joaquin Valley AirPollution Control District Page 9 of 12 District Reference No: 20251287
November 25, 2025
The list of rules below is neither exhaustive nor exclusive. Current District rules can be found online at: https://ww2.valleyair.org/rules-and-planning/current-district-rules-and-requlations. To identify other District rules or regulations that apply to future projects, or to obtain information about District permit requirements, the project proponents are strongly encouraged to contact the District's Small Business Assistance (SBA) Office at (661) 392-5665.
13a) District Rules 2010 and 2201 - Air Quality Permitting for Stationary Sources
Stationary Source emissions include any building, structure, facility, or installation which emits or may emit any affected pollutant directly or as a fugitive emission. District Rule 2010 (Permits Required) requires operators of emission sources to obtain an Authority to Construct (ATC) and Permit to Operate (PTO) from the District. District Rule 2201 (New and Modified Stationary Source Review) requires that new and modified stationary sources of emissions mitigate their emissions using Best Available Control Technology (BACT).

This Project may be subject to District Rule 2010 (Permits Required) and Rule 2201 (New and Modified Stationary Source Review) and may require District permits. Prior to construction, the Project proponent should submit to the District an application for an ATC. For further information or assistance, the project proponent may contact the District's SBA Office at (661) 392-5665. 13b) District Rule 9510 - Indirect Source Review (ISR)
The Project is subject to District Rule 9510 because it will receive a project-level discretionary approval from a public agency and will equal or exceed 9,000 square feet of development space.

The purpose of District Rule 9510 is to reduce the growth in both NOx and PM emissions associated with development and transportation projects from mobile and area sources; specifically, the emissions associated with the construction and subsequent operation of development projects. The ISR Rule requires developers to mitigate their NOx and PM emissions by incorporating clean air design elements into their projects. Should the proposed development project clean air design elements be insufficient to meet the required emission reductions, developers must pay a fee that ultimately funds incentive projects to achieve off-site emissions reductions.

Per Section 5.0 of the ISR Rule, an Air Impact Assessment (AIA) application is required to be submitted no later than applying for project-level approval from a public agency. As of the date of this letter, the District has not received an AIA application for this Project. Please immediately submit an AIA application to the

Page 10 of 12 ends

13c) District Rule 9410 (Employer Based Trip Reduction) 7 13d) District Rule 4601 (Architectural Coatings)
The Project may be subject to District Rule 9410 (Employer Based Trip Reduction) if the project would result in employment of 100 or more “eligible San Joaquin Valley Air Pollution Control District
District Reference No: 20251287
November 25, 2025
The AIA application form can be found online at:
https://ww2.valleyair.org/permitting/indirect-source-review-rule-overview/forms-and-applications/ Information about how to comply with District Rule 9510 can be found online at:
https://ww2.valleyair.org/permittinq/indirect-source-review-rule-overview employees. District Rule 9410 requires employers with 100 or more “eligible” employees at a worksite to establish an Employer Trip Reduction Implementation Plan (eTRIP) that encourages employees to reduce single-occupancy vehicle trips, thus reducing pollutant emissions associated with work commutes. Under an eTRIP plan, employers have the flexibility to select the options that work best for their worksites and their employees.

Information about District Rule 9410 can be found online at:
https://ww2.valleyair.org/compliance/rule-9410-employer-based-trip-reduction/.

District to comply with District Rule 9510 so that proper mitigation and clean air design under ISR can be incorporated into the Project’s design. One AIA application should be submitted for the entire Project.

District staff is available to provide assistance and can be reached by phone at (559) 230-5900 or by email at [email protected].

For additional information, you can contact the District by phone at 559-230- 6000 or by e-mail at [email protected]
The Project may be subject to District Rule 4601 since it may utilize architectural coatings. Architectural coatings are paints, varnishes, sealers, or stains that are applied to structures, portable buildings, pavements or curbs.

The purpose of this rule is to limit VOC emissions from architectural coatings.

In addition, this rule specifies architectural coatings storage, cleanup and labeling reguirements. Additional information on how to comply with District Rule 4601 requirements can be found online at:
https://ww2.valleyair.org/media/tkqieusd/rule-4601.pdf
San Joaquin Valley AirPollution Control District Page 10 of 12 District Reference No: 20251287
November 25, 2025
District to comply with District Rule 9510 so that proper mitigation and clean air design under ISR can be incorporated into the Project's design. One AIA application should be submitted for the entire Project.

Information about how to comply with District Rule 9510 can be found online at:
https://ww2.valleyair.org/permitting/indirect-source-review-rule-overview The AIA application form can be found online at:
https://ww2.valleyair.org/permitting/indirect-source-review-rule-overview/forms-and-applications/ District staff is available to provide assistance and can be reached by phone at (5659) 230-5900 or by email at [email protected].
13c) District Rule 9410 (Employer Based Trip Reduction) The Project may be subject to District Rule 9410 (Employer Based Trip Reduction) if the project would result in employment of 100 or more “eligible” employees. District Rule 9410 requires employers with 100 or more “eligible” employees at a worksite to establish an Employer Trip Reduction Implementation Plan (eTRIP) that encourages employees to reduce single-occupancy vehicle trips, thus reducing pollutant emissions associated with work commutes. Under an eTRIP plan, employers have the flexibility to select the options that work best for their worksites and their employees.

Information about District Rule 9410 can be found online at:
https://ww2.valleyair.org/compliance/rule-9410-employer-based-trip-reduction/.

For additional information, you can contact the District by phone at 559-230- 6000 or by e-mail at [email protected]
13d)District Rule 4601 (Architectural Coatings)
The Project may be subject to District Rule 4601 since it may utilize architectural coatings. Architectural coatings are paints, varnishes, sealers, or stains that are applied to structures, portable buildings, pavements or curbs.

The purpose of this rule is to limit VOC emissions from architectural coatings.

In addition, this rule specifies architectural coatings storage, cleanup and labeling requirements. Additional information on how to comply with District Rule 4601 requirements can be found online at:
https://ww2.valleyair.org/media/tkgjeusd/rule-4601.pdf

Page 11 of 12 ends

13e) District Regulation VIII (Fugitive PM10 Prohibitions) 13f) Other District Rules and Regulations
14)District Comment Letter
The application for both the Construction Notification and Dust Control Plan can be found online at: https://ww2.vallevair.org/media/fm3jrbsq/dcp-form.docx San Joaquin Valley Air Pollution Control District
District Reference No: 20251287
November 25, 2025
The Project may also be subject to the following District rules: Rule 4102 (Nuisance) and Rule 4641 (Cutback, Slow Cure, and Emulsified Asphalt, Paving and Maintenance Operations).

Information about District Regulation VIII can be found online at:
https://ww2.vallevair.org/dustcontrol
The project proponent may be required to submit a Construction Notification Form or submit and receive approval of a Dust Control Plan prior to commencing any earthmoving activities as described in Regulation VIII, specifically Rule 8021 - Construction, Demolition, Excavation, Extraction, and Other Earthmoving Activities.

Should the project result in at least 1-acre in size, the project proponent shall provide written notification to the District at least 48 hours prior to the project proponents intent to commence any earthmoving activities pursuant to District Rule 8021 (Construction, Demolition, Excavation, Extraction, and Other Earthmoving Activities). Also, should the project result in the disturbance of 5- acres or more, or will include moving, depositing, or relocating more than 2,500 cubic yards per day of bulk materials, the project proponent shall submit to the District a Dust Control Plan pursuant to District Rule 8021 (Construction, Demolition, Excavation, Extraction, and Other Earthmoving Activities). For additional information regarding the written notification or Dust Control Plan requirements, please contact District Compliance staff at (559) 230-5950.

The District recommends that a copy of the District’s comments be provided to the Project proponent.

San Joaquin Valley AirPollution Control District Page 11 of 12 District Reference No: 20251287
November 25, 2025
13e) District Regulation VIII (Fugitive PM10 Prohibitions) The project proponent may be required to submit a Construction Notification Form or submit and receive approval of a Dust Control Plan prior to commencing any earthmoving activities as described in Regulation VIII, specifically Rule 8021 — Construction, Demolition, Excavation, Extraction, and Other Earthmoving Activities.

Should the project result in at least 1-acre in size, the project proponent shall provide written notification to the District at least 48 hours prior to the project proponents intent to commence any earthmoving activities pursuant to District Rule 8021 (Construction, Demolition, Excavation, Extraction, and Other Earthmoving Activities). Also, should the project result in the disturbance of 5- acres or more, or will include moving, depositing, or relocating more than 2,500 cubic yards per day of bulk materials, the project proponent shall submit to the District a Dust Control Plan pursuant to District Rule 8021 (Construction, Demolition, Excavation, Extraction, and Other Earthmoving Activities). For additional information regarding the written notification or Dust Control Plan requirements, please contact District Compliance staff at (559) 230-5950.

The application for both the Construction Notification and Dust Control Plan can be found online at: https://ww2.valleyair.org/media/fm3jrbsa/dcp-form.docx Information about District Regulation VIII can be found online at:
https://ww2.valleyair.org/dustcontrol
13f) Other District Rules and Regulations
The Project may also be subject to the following District rules: Rule 4102 (Nuisance) and Rule 4641 (Cutback, Slow Cure, and Emulsified Asphalt, Paving and Maintenance Operations).
14)District Comment Letter
The District recommends that a copy of the District's comments be provided to the Project proponent.

Page 12 of 12 ends

Sincerely,
Daniel Martinez
Program Manager
Mark Montelongo
Director of Policy and Government Affairs
San Joaquin Valley Air Pollution Control District
District Reference No: 20251287
November 25, 2025
If you have any questions or require further information, please contact Harout Sagherian by e-mail at [email protected] or by phone at (559) 230-5860.

San Joaquin Valley AirPollution Control District Page 12 of 12 District Reference No: 20251287
November 25, 2025
If you have any questions or require further information, please contact Harout Sagherian by e-mail at [email protected] or by phone at (5659) 230-5860.

Sincerely,
Mark Montelongo
Director of Policy and Government Affairs
24 Daniel Martinez
Program Manager
Docusign Envelope ID: FEEOAC31-88AB-4B90-9B0C-87C4623472B2 s*L OF ,
evat
J
7 duronut
November 26, 2025
Dear Ashley Knight:

CDFW ROLE
1 CEQA is codified in the California Public Resources Code in section 21000 et seq. The “CEQA Guidelines” are found in Title 14 of the California Code of Regulations, commencing with section 15000.

Conserving California’s l^iCdCife Since 1870
Thank you for the opportunity to provide comments and recommendations regarding those activities involved in the Project that may affect California fish and wildlife.

Likewise, CDFW appreciates the opportunity to provide comments regarding those aspects of the Project that CDFW, by law, may be required to carry out or approve through the exercise of its own regulatory authority under the Fish and Game Code.

CDFW is California’s Trustee Agency for fish and wildlife resources and holds those resources in trust by statute for all the people of the State (Fish & G. Code, §§ 711.7, subd. (a) & 1802; Pub. Resources Code, § 21070; CEQA Guidelines § 15386, subd. (a)). CDFW, in its trustee capacity, has jurisdiction over the conservation, protection, and management of fish, wildlife, native plants, and habitat necessary for biologically sustainable populations of those species (Id., § 1802.). Similarly, for purposes of CEQA, CDFW is charged by law to provide, as available, biological expertise during public The California Department of Fish and Wildlife (CDFW) received a NOP from the City of Bakersfield, as Lead Agency, for the above-referenced Project pursuant to the California Environmental Quality Act (CEQA) and CEQA Guidelines.1 Ashley Knight, Assistant Planner
City of Bakersfield
1715 Chester Avenue, 2nd floor
Bakersfield, California 93301
(661) 326 - 3673
[email protected]
State of California - Natural Resources Agency

DEPARTMENT OF FISH AND WILDLIFE
Central Region
1234 East Shaw Avenue
Fresno, California 93710
(559) 243 - 4005
www.wildlife.ca.gov

CALIFORNIA DEPARTMENT OF
FISH&

WILDLIFE
GAVIN NEWSOM, Governor
CHARLTON H. BONHAM, Director |
79 Subject: Riverview Market Commercial Project (Project) Notice of Preparation (NOP)
State Clearinghouse No.: 2025101507
%
v
Docusign Envelope ID: FEEOAC31-88AB-4B90-9B0C-87C4623472B2 State of California —Natural Resources Agency GAVIN NEWSOM, Governor pd DEPARTMENT OF FISH AND WILDLIFE CHARLTONH. BONHAM, Director Central Region
1234 East Shaw Avenue
Fresno, California 93710
(559) 243 - 4005
www.wildlife.ca.gov
November 26, 2025
Ashley Knight, Assistant Planner
City of Bakersfield
1715 Chester Avenue, 2nd floor
Bakersfield, California 93301
(661) 326 — 3673
[email protected]
Subject: Riverview Market Commercial Project (Project)
Notice of Preparation (NOP)
State Clearinghouse No.: 2025101507
Dear Ashley Knight:

The California Department of Fish and Wildlife (CDFW) received a NOP from the City of Bakersfield, as Lead Agency, for the above-referenced Project pursuant to the California Environmental Quality Act (CEQA) and CEQA Guidelines." Thank you for the opportunity to provide comments and recommendations regarding those activities involved in the Project that may affect California fish and wildlife.

Likewise, CDFW appreciates the opportunity to provide comments regarding those aspects of the Project that CDFW, by law, may be required to carry out or approve through the exercise of its own regulatory authority under the Fish and Game Code.

CDFW ROLE
CDFW is California’s Trustee Agency for fish and wildlife resources and holds those resources in trust by statute for all the people of the State (Fish & G. Code, §§ 711.7, subd. (a) & 1802; Pub. Resources Code, § 21070; CEQA Guidelines § 15386, subd. (a)). CDFW, in its trustee capacity, has jurisdiction over the conservation, protection, and management of fish, wildlife, native plants, and habitat necessary for biologically sustainable populations of those species (Id., § 1802.). Similarly, for purposes of CEQA, CDFW is charged by law to provide, as available, biological expertise during public ' CEQA is codified in the California Public Resources Code in section 21000 et seq. The “CEQA Guidelines” are found in Title 14 of the California Code of Regulations, commencing with section 15000.

Conserving California’s Wildlife Since 1870
Docusign Envelope ID: FEE0AC31-88AB-4B90-9B0C-87C4623472B2

PROJECT DESCRIPTION SUMMARY
Proponent: Coffee Road Ventures, LLC
Timeframe: Approximately 20 months commencing in early 2026 and ending in 2027. agency environmental review efforts, focusing specifically on projects and related activities that have the potential to adversely affect fish and wildlife resources.

Nesting Birds: CDFW has jurisdiction over actions with potential to result in the disturbance or destruction of active nest sites or the unauthorized take of birds. Fish and Game Code sections that protect birds, their eggs and nests include, sections 3503 (regarding unlawful take, possession or needless destruction of the nest or eggs of any bird), 3503.5 (regarding the take, possession or destruction of any birds-of-prey or their nests or eggs), and 3513 (regarding unlawful take of any migratory nongame bird).

Objective: The Project proposes the construction and operation of a commercial retail center that would encompass 405,531 square feet of total building space. The Project would construct market, retail, and storage space, restaurants, and a gas station, car wash, and health club. Other Project components will include vehicular access and circulation, various landscape, hardscape, and lighting improvements, green space/park improvements, site and tenant signage, and infrastructure and utility improvements.

CDFW is also submitting comments as a Responsible Agency under CEQA (Pub.

Resources Code, § 21069; CEQA Guidelines, § 15381). CDFW expects that it may need to exercise regulatory authority as provided by the Fish and Game Code. As proposed, for example, reasonably foreseeable future projects may be subject to CDFW’s lake and streambed alteration regulatory authority (Fish & G. Code, § 1600 et seq.). Likewise, to the extent implementation of reasonably foreseeable future projects may result in “take” as defined by State law of any species protected under the California Endangered Species Act (CESA) (Fish & G. Code, § 2050 et seq.), related authorization as provided by the Fish and Game Code will be required.

Unlisted Species: Species of plants and animals need not be officially listed as Endangered, Rare, or Threatened on any State or federal list pursuant to CESA and/or the federal Endangered Species Act (ESA) to be considered Endangered, Rare, or Threatened under CEQA. If a species can be shown to meet the criteria specified in the CEQA Guidelines (Cal. Code Regs., tit. 14, Chapter 3, § 15380), it should be fully considered in the environmental analysis for the Project.

Location: The Project site is located on approximately 46 acres in the northwestern portion of the City of Bakersfield. The Assessor’s Parcel Number associated with the Project is: 368-010-05.

Ashley Knight, Assistant Planner
November 26, 2025

Page 2 ends

Docusign Envelope ID: FEEOAC31-88AB-4B90-9B0C-87C4623472B2 Ashley Knight, Assistant Planner
November 26, 2025

Page 2 ends

agency environmental review efforts, focusing specifically on projects and related activities that have the potential to adversely affect fish and wildlife resources.

CDFW is also submitting comments as a Responsible Agency under CEQA (Pub.

Resources Code, § 21069; CEQA Guidelines, § 15381). CDFW expects that it may need to exercise regulatory authority as provided by the Fish and Game Code. As proposed, for example, reasonably foreseeable future projects may be subject to CDFW's lake and streambed alteration regulatory authority (Fish & G. Code, § 1600 et seq.). Likewise, to the extent implementation of reasonably foreseeable future projects may result in “take” as defined by State law of any species protected under the California Endangered Species Act (CESA) (Fish & G. Code, § 2050 et seq.), related authorization as provided by the Fish and Game Code will be required.

Nesting Birds: CDFW has jurisdiction over actions with potential to result in the disturbance or destruction of active nest sites or the unauthorized take of birds. Fish and Game Code sections that protect birds, their eggs and nests include, sections 3503 (regarding unlawful take, possession or needless destruction of the nest or eggs of any bird), 3503.5 (regarding the take, possession or destruction of any birds-of-prey or their nests or eggs), and 3513 (regarding unlawful take of any migratory nongame bird).

Unlisted Species: Species of plants and animals need not be officially listed as Endangered, Rare, or Threatened on any State or federal list pursuant to CESA and/or the federal Endangered Species Act (ESA) to be considered Endangered, Rare, or Threatened under CEQA. If a species can be shown to meet the criteria specified in the CEQA Guidelines (Cal. Code Regs., tit. 14, Chapter 3, § 15380), it should be fully considered in the environmental analysis for the Project.

PROJECT DESCRIPTION SUMMARY
Proponent: Coffee Road Ventures, LLC
Objective: The Project proposes the construction and operation of a commercial retail center that would encompass 405,531 square feet of total building space. The Project would construct market, retail, and storage space, restaurants, and a gas station, car wash, and health club. Other Project components will include vehicular access and circulation, various landscape, hardscape, and lighting improvements, green space/park improvements, site and tenant signage, and infrastructure and utility improvements.

Location: The Project site is located on approximately 46 acres in the northwestern portion of the City of Bakersfield. The Assessor's Parcel Number associated with the Project is: 368-010-05.

Timeframe: Approximately 20 months commencing in early 2026 and ending in 2027.

Docusign Envelope ID: FEE0AC31-88AB-4B90-9B0C-87C4623472B2

COMMENTS AND RECOMMENDATIONS
Special-status Species
Aerial imagery shows the Project site contains vacant, undeveloped land comprised of regularly tilled ruderal vegetation and annual grasslands, with internal dirt paths and staging areas for equipment and /materials. The Project site is bordered by a Pacific Gas and Electric Company power generation site on the west and south portions of the Project site; a commercial development and vacant undeveloped land is located to the east; and commercial development is located north of the Project site. The Kern River Parkway is approximately one mile south and California State University, Bakersfield is approximately two miles south of the Project site.

Based on a review of the NOP, aerial imagery, the surrounding habitat, and California Natural Diversity Database (CNDDB) records (CDFW 2025), the Project is within the range of several special-status animal species including, but are not limited to, the federally endangered and State threatened San Joaquin kit fox (Vulpes macrotis mutica); the State threatened Swainson’s hawk (Buteo swainsoni); the State candidate western burrowing owl (Athene cunicularia hypugaea) and Crotch’s bumble bee (Bombus crotchif); the State Species of Special Concern American badger (Taxidea taxus) and Bakersfield legless lizard (Anniella grinnelli)', and the State species of special concern and federally proposed threatened western spadefoot toad (Spea hammondii).

To adequately assess potential Project related impacts to biological resources in the DEIR, CDFW recommends that a qualified biologist perform relevant database reviews and other research of the Project area, then conduct focused habitat assessments and/or focused biological surveys during the appropriate survey period(s) in order to determine whether any special-status species may be present within the Project site.

CDFW recommends this initial work be documented and used to inform further efforts that may be needed thereafter including the need for additional protocol surveys and/or the development of avoidance, minimization, and/or mitigation measures. This information and analysis may then be used to consider the development of modified or new Project alternatives to avoid and minimize potentially significant environmental impacts on the biological environment. This information is critical to make an informed decision during the CEQA process and to ensure Project compliance with CESA, Fish and Game code, and other applicable State and federal laws and regulations.

CDFW offers the following comments and recommendations to assist the City of Bakersfield in adequately identifying and/or mitigating the Project’s significant, or potentially significant, direct and indirect impacts on fish and wildlife (biological) resources. Editorial comments or other suggestions may also be included to improve the Draft Environmental Impact Report (DEIR) prepared for this Project.

Ashley Knight, Assistant Planner
November 26, 2025

Page 3 ends

Docusign Envelope ID: FEEOAC31-88AB-4B90-9B0C-87C4623472B2 Ashley Knight, Assistant Planner
November 26, 2025

Page 3 ends

COMMENTS AND RECOMMENDATIONS
CDFW offers the following comments and recommendations to assist the City of Bakersfield in adequately identifying and/or mitigating the Project’s significant, or potentially significant, direct and indirect impacts on fish and wildlife (biological) resources. Editorial comments or other suggestions may also be included to improve the Draft Environmental Impact Report (DEIR) prepared for this Project.

Special-status Species
Aerial imagery shows the Project site contains vacant, undeveloped land comprised of regularly tilled ruderal vegetation and annual grasslands, with internal dirt paths and staging areas for equipment and /materials. The Project site is bordered by a Pacific Gas and Electric Company power generation site on the west and south portions of the Project site; a commercial development and vacant undeveloped land is located to the east; and commercial development is located north of the Project site. The Kern River Parkway is approximately one mile south and California State University, Bakersfield is approximately two miles south of the Project site.

Based on a review of the NOP, aerial imagery, the surrounding habitat, and California Natural Diversity Database (CNDDB) records (CDFW 2025), the Project is within the range of several special-status animal species including, but are not limited to, the federally endangered and State threatened San Joaquin kit fox (Vulpes macrotis mutica); the State threatened Swainson’s hawk (Buteo swainsoni); the State candidate western burrowing owl (Athene cunicularia hypugaea) and Crotch’s bumble bee (Bombus croftchii); the State Species of Special Concern American badger (Taxidea taxus) and Bakersfield legless lizard (Anniella grinnelli); and the State species of special concern and federally proposed threatened western spadefoot toad (Spea hammondii).

To adequately assess potential Project related impacts to biological resources in the DEIR, CDFW recommends that a qualified biologist perform relevant database reviews and other research of the Project area, then conduct focused habitat assessments and/or focused biological surveys during the appropriate survey period(s) in order to determine whether any special-status species may be present within the Project site.

CDFW recommends this initial work be documented and used to inform further efforts that may be needed thereafter including the need for additional protocol surveys and/or the development of avoidance, minimization, and/or mitigation measures. This information and analysis may then be used to consider the development of modified or new Project alternatives to avoid and minimize potentially significant environmental impacts on the biological environment. This information is critical to make an informed decision during the CEQA process and to ensure Project compliance with CESA, Fish and Game code, and other applicable State and federal laws and regulations.

Docusign Envelope ID: FEE0AC31-88AB-4B90-9B0C-87C4623472B2 San Joaquin Kit Fox
Based on aerial imagery, the Project site and the vacant parcels surrounding the site contain suitable habitat for San Joaquin kit fox (SJKF) denning and foraging. The Project site is within the known geographic range of SJKF, and there are multiple recent and historical nearby occurrences listed on CNDDB (CDFW 2025). Bakersfield is home to a significant urban population of SJKF and this population has been recorded to utilize anthropogenically altered habitats (Cypher 2013). San Joaquin kit fox may be attracted to both construction materials (pipes, etc.) and construction footprints due to the type and level of activity (excavation, etc.) and the loose, friable soils that are created as a result of intensive ground disturbance. SJKF will readily use shipping containers, portable buildings, and stacks of materials (e.g., I-beams, wooden boards) with spaces within or underneath them for denning, in addition to pipes and culverts (Cypher et al. 2023), and it is likely that these materials would be present within the Project site, prior to, during, and after construction. Therefore, CDFW recommends thoroughly inspecting all construction materials or structures with sufficient spaces for SJKF, in addition to pipes and culvert-like structures, before these materials are used or moved in any way during Project implementation. To deter SJKF from creating dens under construction materials, CDFW recommends elevating materials one foot or more off the ground using k-rails or similar structures. Additionally, CDFW recommends a qualified biologist conduct on-site worker awareness training and inspect all construction materials for SJKF before use. Any pits or trenches created should be sloped or covered to prevent inadvertent capture or entrapment (take).

In addition the general recommendations above, as SJKF have a high potential to den and/or forage within the Project site and have been documented within the Project vicinity, CDFW strongly recommends that the Project proponent consult with CDFW to discuss how to implement the Project and avoid take, or, if take cannot be avoided, to acquire SJKF take authorization through the acquisition of an Incidental Take Permit (ITP), pursuant to Fish and Game Code section 2081 subdivision (b).

Ashley Knight, Assistant Planner
November 26, 2025

Page 4 ends

Docusign Envelope ID: FEEOAC31-88AB-4B90-9B0C-87C4623472B2 Ashley Knight, Assistant Planner
November 26, 2025

Page 4 ends

San Joaquin Kit Fox
Based on aerial imagery, the Project site and the vacant parcels surrounding the site contain suitable habitat for San Joaquin kit fox (SJKF) denning and foraging. The Project site is within the known geographic range of SJKF, and there are multiple recent and historical nearby occurrences listed on CNDDB (CDFW 2025). Bakersfield is home to a significant urban population of SUKF and this population has been recorded to utilize anthropogenically altered habitats (Cypher 2013). San Joaquin kit fox may be attracted to both construction materials (pipes, etc.) and construction footprints due to the type and level of activity (excavation, etc.) and the loose, friable soils that are created as a result of intensive ground disturbance. SJKF will readily use shipping containers, portable buildings, and stacks of materials (e.g., I-beams, wooden boards) with spaces within or underneath them for denning, in addition to pipes and culverts (Cypher et al. 2023), and it is likely that these materials would be present within the Project site, prior to, during, and after construction. Therefore, CDFW recommends thoroughly inspecting all construction materials or structures with sufficient spaces for SJKF, in addition to pipes and culvert-like structures, before these materials are used or moved in any way during Project implementation. To deter SJKF from creating dens under construction materials, CDFW recommends elevating materials one foot or more off the ground using k-rails or similar structures. Additionally, CDFW recommends a qualified biologist conduct on-site worker awareness training and inspect all construction materials for SUKF before use. Any pits or trenches created should be sloped or covered to prevent inadvertent capture or entrapment (take).

In addition the general recommendations above, as SJKF have a high potential to den and/or forage within the Project site and have been documented within the Project vicinity, CDFW strongly recommends that the Project proponent consult with CDFW to discuss how to implement the Project and avoid take, or, if take cannot be avoided, to acquire SJKF take authorization through the acquisition of an Incidental Take Permit (ITP), pursuant to Fish and Game Code section 2081 subdivision (b).

Docusign Envelope ID: FEE0AC31-88AB-4B90-9B0C-87C4623472B2 Recommended Mitigation Measure 1: SJKF Preconstruction Surveys Recommended Mitigation Measure 2: SJKF Avoidance Buffer Recommended Mitigation Measure 3: SJKF Take Authorization Swainson’s Hawk
As suitable SWHAforaging and nesting habitat appear to be present within the Project site and vicinity, and SWHA have been documented within the surrounding area, CDFW recommends surveys for SWHA be conducted as part of the biological technical studies conducted in support of the DEIR by a qualified biologist following the survey methods developed by the Swainson’s Hawk Technical Advisory Committee (SWHATAC 2000).

CDFW recommends assessing presence/absence of denning SJKF by conducting focused den surveys for the species prior to the initiation of Project ground disturbance activities. Specifically, CDFW recommends conducting these surveys over the entirety of the Project site no less than 14-days and no more than 30-days prior to beginning of ground and/or vegetation disturbing activities.

Additionally, CDFW recommends adding the following as mitigation measures within the DEIR:

Swainson’s hawks (SWHA) are known to breed within the Central Valley of California and prefer to nest and forage in alfalfa, fallow fields, field crops, and grassland habitats with a sufficient source of small mammals (CDFG 1994). Several large parcels of lands to the south and east of the Project site may be utilized for foraging and infrastructure such and power and light poles in the Project vicinity may be utilized for perching.

SWHA are known to travel up to 18 miles to forage and are also attracted to ground disturbing activities such as disking because these activities make prey vulnerable by reducing cover (Estep 1989). CNDDB occurrences are noted within this 18-mile distance of the Project site. SWHA exhibit high nest-site fidelity year after year and lack of suitable habitat limits their local distribution and abundance (CDFW 2016).

CDFW recommends implementing no-disturbance buffers, as described in the USFWS’ “Standardized Recommendations for Protection of the San Joaquin Kit Fox Prior to or During Ground Disturbance” (2011) (USFWS Protocol) around potentially suitable or known SJKF den sites.

If the no-disturbance buffers outlined in the USFWS Protocol for SJKF is not feasible, CDFW recommends that consultation with CDFW occur to discuss how to implement the Project and avoid take. If take cannot be avoided, CDFW recommends the Project proponent acquire take authorization through the acquisition of an ITP, pursuant to Fish and Game Code section 2081 subdivision (b) to comply with CESA.

Ashley Knight, Assistant Planner
November 26, 2025

Page 5 ends

Docusign Envelope ID: FEEOAC31-88AB-4B90-9B0C-87C4623472B2 Ashley Knight, Assistant Planner
November 26, 2025

Page 5 ends

Additionally, CDFW recommends adding the following as mitigation measures within the DEIR:

Recommended Mitigation Measure 1: SUKF Preconstruction Surveys CDFW recommends assessing presence/absence of denning SJKF by conducting focused den surveys for the species prior to the initiation of Project ground disturbance activities. Specifically, CDFW recommends conducting these surveys over the entirety of the Project site no less than 14-days and no more than 30-days prior to beginning of ground and/or vegetation disturbing activities.

Recommended Mitigation Measure 2: SJKF Avoidance Buffer CDFW recommends implementing no-disturbance buffers, as described in the USFWS’ “Standardized Recommendations for Protection of the San Joaquin Kit Fox Prior to or During Ground Disturbance” (2011) (USFWS Protocol) around potentially suitable or known SJKF den sites.

Recommended Mitigation Measure 3: SJKF Take Authorization If the no-disturbance buffers outlined in the USFWS Protocol for SJKF is not feasible, CDFW recommends that consultation with CDFW occur to discuss how to implement the Project and avoid take. If take cannot be avoided, CDFW recommends the Project proponent acquire take authorization through the acquisition of an ITP, pursuant to Fish and Game Code section 2081 subdivision (b) to comply with CESA.

Swainson’s Hawk
Swainson’s hawks (SWHA) are known to breed within the Central Valley of California and prefer to nest and forage in alfalfa, fallow fields, field crops, and grassland habitats with a sufficient source of small mammals (CDFG 1994). Several large parcels of lands to the south and east of the Project site may be utilized for foraging and infrastructure such and power and light poles in the Project vicinity may be utilized for perching.

SWHA are known to travel up to 18 miles to forage and are also attracted to ground disturbing activities such as disking because these activities make prey vulnerable by reducing cover (Estep 1989). CNDDB occurrences are noted within this 18-mile distance of the Project site. SWHA exhibit high nest-site fidelity year after year and lack of suitable habitat limits their local distribution and abundance (CDFW 2016).

As suitable SWHA foraging and nesting habitat appear to be present within the Project site and vicinity, and SWHA have been documented within the surrounding area, CDFW recommends surveys for SWHA be conducted as part of the biological technical studies conducted in support of the DEIR by a qualified biologist following the survey methods developed by the Swainson’s Hawk Technical AdvisoryCommittee (SWHA TAC 2000).

Docusign Envelope ID: FEE0AC31-88AB-4B90-9B0C-87C4623472B2 Recommended Mitigation Measure 4: SWHA Surveys Prior to Construction Recommended Mitigation Measure 5: SWHA Avoidance Buffer Recommended Mitigation Measure 6: SWHA Take Authorization Recommended Mitigation Measure 7: SWHA Foraging Habitat Mitigation • For projects within 5 miles of an active nest but greater than 1 mile, a minimum of % acre of HM land for each acre of development is advised. • For projects within 1 mile of an active nest tree, a minimum of 1 acre of habitat management (HM) land for each acre of development is advised.

CDFW also recommends that in the event an active SWHA nest is detected, and a 12-mile no-disturbance buffer is not feasible, consultation with CDFW is warranted to discuss how to implement the Project and avoid take. If take cannot be avoided, take authorization through the acquisition of an ITP, pursuant to Fish and Game Code section 2081 subdivision (b) is necessary to comply with CESA.

In addition to conducting SWHA surveys, CDFW recommends the DEIR include the following measures:

If Project-specific activities will take place during the SWHA nesting season (i.e., March 1 through September 15), and active SWHA nests are present, CDFW recommends a minimum 1-mile no-disturbance buffer be delineated and maintained around each nest, regardless of whether it was detected by surveys or observed incidentally. These buffers would remain in place until the breeding season has ended or until a qualified biologist has determined that the birds have fledged and are no longer reliant upon the nest or parental care for survival, to prevent nest abandonment and other take of SWHA as a result of Project activities.

Finally, CDFW recommends compensation for the loss of SWHA foraging habitat as described in CDFW’s “Staff Report Regarding Mitigation for Impacts to Swainson's Hawks” (CDFG 1994) to reduce impacts to foraging habitat to less than significant. The Staff Report recommends that mitigation for habitat loss occur within a minimum distance of 10 miles from known nest sites. CDFW has the following recommendations based on the Staff Report:

Depending on the time between the initial survey efforts conducted in support of the DEIR and Project construction, CDFW recommends that additional surveys, following the survey methodology developed by the SWHA Technical Advisory Committee, be repeated the survey season immediately prior to any ground disturbing activities that occur as part of this Project.

Ashley Knight, Assistant Planner
November 26, 2025

Page 6 ends

Docusign Envelope ID: FEEOAC31-88AB-4B90-9B0C-87C4623472B2 Ashley Knight, Assistant Planner
November 26, 2025

Page 6 ends

In addition to conducting SWHA surveys, CDFW recommends the DEIR include the following measures:

Recommended Mitigation Measure 4: SWHA Surveys Prior to Construction Depending on the time between the initial survey efforts conducted in support of the DEIR and Project construction, CDFW recommends that additional surveys, following the survey methodology developed by the SWHA Technical Advisory Committee, be repeated the survey season immediately prior to any ground disturbing activities that occur as part of this Project.

Recommended Mitigation Measure 5: SWHA Avoidance Buffer If Project-specific activities will take place during the SWHA nesting season (i.e., March 1 through September 15), and active SWHA nests are present, CDFW recommends a minimum Yz-mile no-disturbance buffer be delineated and maintained around each nest, regardless of whether it was detected by surveys or observed incidentally. These buffers would remain in place until the breeding season has ended or until a qualified biologist has determined that the birds have fledged and are no longer reliant upon the nest or parental care for survival, to prevent nest abandonment and other take of SWHA as a result of Project activities.

Recommended Mitigation Measure 6: SWHA Take Authorization CDFW also recommends that in the event an active SWHA nest is detected, and a ¥2-mile no-disturbance buffer is not feasible, consultation with CDFW is warranted to discuss how to implement the Project and avoid take. If take cannot be avoided, take authorization through the acquisition of an ITP, pursuant to Fish and Game Code section 2081 subdivision (b) is necessary to comply with CESA.

Recommended Mitigation Measure 7: SWHA Foraging Habitat Mitigation Finally, CDFW recommends compensation for the loss of SWHA foraging habitat as described in CDFW’s “Staff Report Regarding Mitigation for Impacts to Swainson's Hawks” (CDFG 1994) to reduce impacts to foraging habitat to less than significant. The Staff Report recommends that mitigation for habitat loss occur within a minimum distance of 10 miles from known nest sites. CDFW has the following recommendations based on the Staff Report:
» For projects within 1 mile of an active nest tree, a minimum of 1 acre of habitat management (HM) land for each acre of development is advised. e For projects within 5 miles of an active nest but greater than 1 mile, a minimum of % acre of HM land for each acre of development is advised.

Docusign Envelope ID: FEE0AC31-88AB-4B90-9B0C-87C4623472B2 Western Burrowing Owl
Recommended Mitigation Measure 8: BUOW Pre-construction Surveys Recommended Mitigation Measure 9: BUOW Avoidance Buffer The Project site is within the known geographic range of BUOW and there are multiple historic and recent occurrences located within five miles of the Project site (CDFW 2025). BUOW inhabit open grasslands and desert scrublands containing small mammal burrows, a requisite habitat feature used by BUOW for nesting and cover, and they are known to forage in agricultural lands. Based on aerial imagery, the Project site and adjacent lands contain suitable habitat for BUOW nesting and foraging.

Depending on the time between the initial survey efforts conducted in support of the DEIR and Project construction, CDFW recommends that additional focused surveys, following the 2012 Staff Report on Burrowing Owl Mitigation (2012 Staff Report) (CDFG 2012), be conducted the survey season immediately prior to construction. Please note that the 2012 Staff Report necessitates multiple surveys prior to the initiation of construction.

Should a BUOW or known BUOW den (active or inactive) be detected, either during pre-construction surveys or construction activities, CDFW recommends that no-disturbance buffers, as outlined in the 2012 Staff Report on Burrowing Owl Mitigation (CDFG 2012), be implemented prior to and during any ground-disturbing activities. CDFW also recommends that these buffers be implemented for both wintering and breeding BUOW.
• For projects within 10 miles of an active nest tree but greater than 5 miles from an active nest tree, a minimum of %2 acre of HM land for each acre of development is advised.

As BUOW are known to occur within the Project vicinity and suitable nesting and foraging habitat is present within the Project site, CDFW recommends assessing presence/absence of BUOW by having a qualified biologist conduct surveys following the 2012 Staff Report on Burrowing Owl Mitigation (CDFG 2012) as part of the biological studies conducted in support of the DEIR. In addition to conducting surveys for BUOW, CDFW recommends the DEIR include the following measures:

Ashley Knight, Assistant Planner
November 26, 2025

Page 7 ends

The California Fish and Game Commission (FGC) approved BUOW as a candidate for potential listing as a protected species under CESAon October 10, 2024, and published these findings in the California Regulatory Notice Register (Notice Register) on October 25, 2024. As such, BUOW is now a candidate under CESA and receives the same legal protection afforded to an endangered or threatened species (Fish & G. Code, §§ 2074.2 & 2085).

Docusign Envelope ID: FEEOAC31-88AB-4B90-9B0C-87C4623472B2 Ashley Knight, Assistant Planner
November 26, 2025

Page 7 ends

o For projects within 10 miles of an active nest tree but greater than 5 miles from an active nest tree, a minimum of 'z acre of HM land for each acre of development is advised.

Western Burrowing Owl
The California Fish and Game Commission (FGC) approved BUOW as a candidate for potential listing as a protected species under CESA on October 10, 2024, and published these findings in the California Regulatory Notice Register (Notice Register) on October 25, 2024. As such, BUOW is now a candidate under CESA and receives the same legal protection afforded to an endangered or threatened species (Fish & G. Code, §§ 2074.2 & 2085).

The Project site is within the known geographic range of BUOW and there are multiple historic and recent occurrences located within five miles of the Project site (CDFW 2025). BUOW inhabit open grasslands and desert scrublands containing small mammal burrows, a requisite habitat feature used by BUOW for nesting and cover, and they are known to forage in agricultural lands. Based on aerial imagery, the Project site and adjacent lands contain suitable habitat for BUOW nesting and foraging.

As BUOW are known to occur within the Project vicinity and suitable nesting and foraging habitat is present within the Project site, CDFW recommends assessing presence/absence of BUOW by having a qualified biologist conduct surveys following the 2012 Staff Report on Burrowing Owl Mitigation (CDFG 2012) as part of the biological studies conducted in support of the DEIR. In addition to conducting surveys for BUOW, CDFW recommends the DEIR include the following measures:

Recommended Mitigation Measure 8: BUOW Pre-construction Surveys Depending on the time between the initial survey efforts conducted in support of the DEIR and Project construction, CDFW recommends that additional focused surveys, following the 2012 Staff Report on Burrowing Owl Mitigation (2012 Staff Report) (CDFG 2012), be conducted the survey season immediately prior to construction. Please note that the 2012 Staff Report necessitates multiple surveys prior to the initiation of construction.

Recommended Mitigation Measure 9: BUOW Avoidance Buffer Should a BUOW or known BUOW den (active or inactive) be detected, either during pre-construction surveys or construction activities, CDFW recommends that no-disturbance buffers, as outlined in the 2012 Staff Report on Burrowing Owl Mitigation (CDFG 2012), be implemented prior to and during any ground-disturbing activities. CDFW also recommends that these buffers be implemented for both wintering and breeding BUOW.

Docusign Envelope ID: FEE0AC31-88AB-4B90-9B0C-87C4623472B2 Recommended Mitigation Measure 10: BUOW Take Authorization Crotch’s Bumble Bee
Recommended Mitigation Measure 11: CBB Surveys
Recommended Mitigation Measure 12: CBB Avoidance
If CBB is detected, then CDFW recommends that all small mammal burrows and thatched/bunch grasses be avoided by a minimum of 50 feet to avoid take and potentially significant impacts. If ground-disturbing activities will occur during the Depending on the time between the initial survey efforts conducted in support of the DEIR and Project construction, CDFW recommends that a qualified biologist conduct additional focused surveys for CBB, and their requisite habitat features following the methodology outlined in the Survey Considerations for California Endangered Species Act Candidate Bumble Bee Species (CDFW 2023).

If a BUOW or known BUOW den (active or inactive) is detected, and the no-disturbance buffers outlined in the 2012 Staff Report on Burrowing Mitigation are not feasible, consultation with CDFW is warranted to discuss how to implement the Project and avoid take. If take cannot be avoided, take authorization through the acquisition of an ITP, pursuant to Fish and Game Code section 2081 subdivision (b) is necessary to comply with CESA.

As the Project site is within the known range for CBB and suitable nesting and foraging habitat may be present within the Project site and vicinity, CDFW recommends a qualified biologist conduct a habitat assessment as part of the biological technical studies conducted in support of the DEIR to determine if the Project site and the immediate surrounding vicinity contain habitat suitable to support CBB. Potential nesting sites, which include all small mammal burrows, perennial bunch grasses, thatched annual grasses, brush piles, old bird nests, dead trees, and hollow logs would need to be documented as part of the assessment. If potentially suitable habitat is identified, CDFW recommends that a qualified biologist conduct focused surveys for CBB, and their requisite habitat features following the methodology outlined in the Survey Considerations for California Endangered Species Act Candidate Bumble Bee Species (CDFW 2023). If suitable CBB habitat is identified during the habitat assessment, CDFW recommends the DEIR include the following measures:

The Project site is within the known geographical range of Crotch’s bumble bee (CBB), and several recent occurrences have been documented within three miles of the Project site (CDFW 2025). CBB are known to inhabit areas of grasslands and scrub that contain requisite habitat elements for nesting, such as small mammal burrows and bunch/thatched grasses, and these habitat elements may be present within the Project site and Project vicinity.

Ashley Knight, Assistant Planner
November 26, 2025

Page 8 ends

Docusign Envelope ID: FEEOAC31-88AB-4B90-9B0C-87C4623472B2 Ashley Knight, Assistant Planner
November 26, 2025

Page 8 ends

Recommended Mitigation Measure 10: BUOW Take Authorization If aBUOW or known BUOW den (active or inactive) is detected, and the no-disturbance buffers outlined in the 2012 Staff Report on Burrowing Mitigation are not feasible, consultation with CDFW is warranted to discuss how to implement the Project and avoid take. If take cannot be avoided, take authorization through the acquisition of an ITP, pursuant to Fish and Game Code section 2081 subdivision (b) is necessary to comply with CESA.

Crotch’s Bumble Bee
The Project site is within the known geographical range of Crotch’'s bumble bee (CBB), and several recent occurrences have been documented within three miles of the Project site (CDFW 2025). CBB are known to inhabit areas of grasslands and scrub that contain requisite habitat elements for nesting, such as small mammal burrows and bunch/thatched grasses, and these habitat elements may be present within the Project site and Project vicinity.

As the Project site is within the known range for CBB and suitable nesting and foraging habitat may be present within the Project site and vicinity, CDFW recommends a qualified biologist conduct a habitat assessment as part of the biological technical studies conducted in support of the DEIR to determine if the Project site and the immediate surrounding vicinity contain habitat suitable to support CBB. Potential nesting sites, which include all small mammal burrows, perennial bunch grasses, thatched annual grasses, brush piles, old bird nests, dead trees, and hollow logs would need to be documented as part of the assessment. If potentially suitable habitat is identified, CDFW recommends that a qualified biologist conduct focused surveys for CBB, and their requisite habitat features following the methodology outlined in the Survey Considerations for California Endangered Species Act Candidate Bumble Bee Species (CDFW 2023). If suitable CBB habitat is identified during the habitat assessment, CDFW recommends the DEIR include the following measures:

Recommended Mitigation Measure 11: CBB Surveys
Depending on the time between the initial survey efforts conducted in support of the DEIR and Project construction, CDFW recommends that a qualified biologist conduct additional focused surveys for CBB, and their requisite habitat features following the methodology outlined in the Survey Considerations for California Endangered Species Act Candidate Bumble Bee Species (CDFW 2023).

Recommended Mitigation Measure 12: CBB Avoidance
If CBB is detected, then CDFW recommends that all small mammal burrows and thatched/bunch grasses be avoided by a minimum of 50 feet to avoid take and potentially significant impacts. If ground-disturbing activities will occur during the Docusign Envelope ID: FEE0AC31-88AB-4B90-9B0C-87C4623472B2 Recommended Mitigation Measure 13: CBB Take Authorization State Species of Special Concern
Recommended Mitigation Measure 14: Surveys
Recommended Mitigation Measure 15: Avoidance
Avoidance whenever possible is encouraged via delineation and observance of a 50-foot no-disturbance buffer around dens or burrows/refugia of these species. If these species are observed on the Project site, CDFW recommends that Project construction activities in their immediate vicinity cease, allowing individuals to leave the Project site on their own accord.

The Project is within the geographic range of species of American badger (AM BA), Bakersfield legless lizard (BLL), and western spadefoot (WESP), and suitable habitat may be present within the Project site. As such, CDFW recommends a qualified biologist conduct a habitat assessment to determine if the Project site and the immediate surrounding vicinity contain habitat suitable to support AMBA, BLL, and WESP. If suitable habitat is determined to be present, CDFW recommends that a qualified biologist conduct focused surveys for these species as part of the biological technical studies conducted in support of the DEIR. In addition to conducting habitat assessments and surveys for AMBA, BLL, and WESP, CDFW recommends the DEIR include the following measures.

If CBB is detected, consultation with CDFW is warranted to discuss how to implement the Project and avoid take. If take cannot be avoided, take authorization through the acquisition of an ITP, pursuant to Fish and Game Code section 2081 subdivision (b) is necessary to comply with CESA. overwintering period (October through February), consultation with CDFW is warranted to discuss how to implement Project activities and avoid take. Any detection of CBB prior to or during Project implementation warrants consultation with CDFW to discuss how to avoid take.

CDFW recommends that a qualified biologist conduct focused surveys, using appropriate survey methodologies, for the special-status species referenced above prior to any ground disturbing activities that may occur as part of the Project.

Ashley Knight, Assistant Planner
November 26, 2025

Page 9 ends

Docusign Envelope ID: FEEOAC31-88AB-4B90-9B0C-87C4623472B2 Ashley Knight, Assistant Planner
November 26, 2025

Page 9 ends

overwintering period (October through February), consultation with CDFW is warranted to discuss how to implement Project activities and avoid take. Any detection of CBB prior to or during Project implementation warrants consultation with CDFW to discuss how to avoid take.

Recommended Mitigation Measure 13: CBB Take Authorization If CBB is detected, consultation with CDFW is warranted to discuss how to implement the Project and avoid take. If take cannot be avoided, take authorization through the acquisition of an ITP, pursuant to Fish and Game Code section 2081 subdivision (b) is necessary to comply with CESA.

State Species of Special Concern
The Project is within the geographic range of species of American badger (AMBA), Bakersfield legless lizard (BLL), and western spadefoot (WESP), and suitable habitat may be present within the Project site. As such, CDFW recommends a qualified biologist conduct a habitat assessment to determine if the Project site and the immediate surrounding vicinity contain habitat suitable to support AMBA, BLL, and WESP. If suitable habitat is determined to be present, CDFW recommends that a qualified biologist conduct focused surveys for these species as part of the biological technical studies conducted in support of the DEIR. In addition to conducting habitat assessments and surveys for AMBA, BLL, and WESP, CDFW recommends the DEIR include the following measures.

Recommended Mitigation Measure 14: Surveys
CDFW recommends that a qualified biologist conduct focused surveys, using appropriate survey methodologies, for the special-status species referenced above prior to any ground disturbing activities that may occur as part of the Project.

Recommended Mitigation Measure 15: Avoidance
Avoidance whenever possible is encouraged via delineation and observance of a 50-foot no-disturbance buffer around dens or burrows/refugia of these species. If these species are observed on the Project site, CDFW recommends that Project construction activities in their immediate vicinity cease, allowing individuals to leave the Project site on their own accord.

Docusign Envelope ID: FEE0AC31-88AB-4B90-9B0C-87C4623472B2 Editorial Comments and/or Suggestions
If continuous monitoring of identified nests by a qualified biologist is not feasible, CDFW recommends a minimum no-disturbance buffer of 250 feet around active nests of non-listed bird species and a 500-foot no-disturbance buffer around active nests of non-listed raptors. These buffers are advised to remain in place until the breeding season has ended or until a qualified biologist has determined the birds have fledged and are no longer reliant upon the nest or on-site parental care for survival. Variance from these no-disturbance buffers is possible when there is a compelling biological or ecological reason to do so, such as when the Project site would be concealed from a nest site by topography. CDFW recommends that a qualified biologist advise and support any variance from these buffers and notify CDFW in advance of implementing a variance.

Nesting birds: CDFW encourages that Project ground-disturbing activities occur during the bird non-nesting season; however, if ground-disturbing or vegetation-disturbing activities must occur during the nesting season (February 1st through September 15th), the Project applicant is responsible for ensuring that implementation of the Project does not result in violation of the Migratory Bird Treaty Act or relevant Fish and Game Code sections as referenced above.

CDFW further recommends that a qualified biologist conduct a pre-construction survey for active nests no more than 10 days prior to the start of ground or vegetation disturbance to maximize the probability that nests that could potentially be impacted are detected. CDFW also recommends that surveys cover a sufficient area around the Project site to identify nests and determine their status. A sufficient area means any area potentially affected, either directly or indirectly, by the Project. In addition to direct impacts (i.e., nest destruction), noise, vibration, and movement of workers or equipment could also affect nests. CDFW recommends that a qualified biologist establish a behavioral baseline of all identified nests. Once Project activities begin, CDFW recommends having a qualified biologist continuously monitor nests to detect behavioral changes resulting from the Project. If behavioral changes occur, CDFW recommends halting the work causing that change and consulting with CDFW for additional avoidance and minimization measures.

Ashley Knight, Assistant Planner