Draft Environmental Impact Report
Riverview Marketplace
Commercial Project
SCH # 2025101507
Prepared for:
City of Bakersfield
Development Services Department
Planning Division
1715 Chester Avenue, 2nd Floor
Bakersfield, CA 93301
Prepared by:
Kimley-Horn and Associates, Inc.
660 South Figueroa Street, Suite 2050
Los Angeles, CA 90017
P 213.261.4040
July 2026
Kimley»Horn
City of Bakersfield – SCH No. 2025101507 ES-1
Executive Summary
ES.1 Purpose
This Draft Environmental Impact Report (EIR) has been prepared to evaluate the potential environmental impacts associated with the implementation of the Riverview Marketplace Commercial Project (Project), State Clearinghouse No. 2025101507. This document is prepared in conformance with the California Environmental Quality Act (CEQA) and the CEQA Guidelines.
The purpose of this Draft EIR is to disclose information to the public and decision makers about the potential environmental effects of the Project. This Draft EIR does not recommend either approval or denial of the Project; rather, it is intended to provide a source of independent and impartial analysis of the foreseeable environmental impacts of a proposed course of action. This Draft EIR describes the Project, evaluates its environmental effects, and discusses reasonable alternatives that would attempt to avoid, reduce, or minimize environmental impacts. The City of Bakersfield will consider the information presented in this document in making an informed decision regarding the Project.
This summary is provided in accordance with CEQA Guidelines Section 15123. As stated in the CEQA Guidelines Section 15123(a), “an EIR shall contain a brief summary of the proposed actions and its consequences. The language of the summary should be as clear and simple as reasonably practical.” As required by the Guidelines, this section includes: (1) a summary description of the Project; (2) a discussion of the areas of controversy associated with the project; (3) identification of the alternatives evaluated and of the environmentally superior alternative; and (4) a synopsis of environmental impacts and recommended mitigation measures.
ES.2 Proposed Project
As described in Chapter 2, Project Description, of this Draft EIR, the Project Site is located on a portion of a larger property formerly occupied by the Pacific Gas & Electric (PG&E) Kern Power Plant. The Project Site is currently secured on all sides by six-foot-tall chain-link fencing, with vehicular access provided via gated unpaved entry drives along Coffee Frontage Road and one concrete paved driveway along Rosedale Highway. Both Coffee Road and Rosedale Highway are improved with concrete curb and gutters, yet only Rosedale Highway is fully developed with a concrete sidewalk. A portion of Coffee Road is improved with a concrete sidewalk. Existing onsite features include abandoned oil wells, electrical transmission lines on metal poles, towers, and wooden poles, and several dirt roads and mounds.
The Project involves construction and operation of the Riverview Marketplace, a commercial retail center that would encompass 405,531 square feet of total building space. The specific businesses and/or tenants that would ultimately occupy each of the buildings are not fully known at this time.
However, it is assumed that larger interior anchor buildings within the Project Site would be occupied by markets, retail uses, storage uses, and a health club. The outer building pads would be occupied by smaller retail tenants, a medical office, drive-thrus, fast casual and sit-down restaurants, a car wash, and a gas station with 20 dual-sided pumps.
Riverview Marketplace Commercial Project
Environmental Impact Report Executive Summary
City of Bakersfield – SCH No. 2025101507 ES-2
The Project would feature new landscaping along the entire site perimeter and internal to the Project Site. Landscaping would include a variety of ornamental trees, shrubs, and groundcover that would help soften the massing of the buildings, provide for a pedestrian oriented experience and provide shade. The Project would also include enhanced paving areas within small plaza areas in front of storefronts, and enhanced vehicular paving at entry points. The Project would include a detention basin on the northern portion of the Project Site that would be fenced and screened with landscaping. Near the detention basin would be a play area which would include landscaped mounds, benches, picnic tables, bike racks, and a lawn area.
Loading and unloading of delivery trucks for the major retail buildings would occur in the designated loading dock of that building, which are toward the rear of the buildings. For the tenants of the outlying building pads, loading and unloading of delivery trucks would occur in designated areas (within proximity of the tenants) that would not impede the internal vehicular circulation system. No loading or unloading activities would occur in the parking areas or non-designated loading/unloading areas.
The discretionary entitlements, reviews, permits and approvals required to implement the Project include, but are not necessarily limited to, the following:
• Site Plan Review consistent with the Bakersfield Municipal Code Section 17.08.140. • General Plan Amendment (GPA) of the land use element of the Metropolitan Bakersfield General Plan (General Plan) from P (Public Facilities) to LI (Light Industrial) • Tentative Tract Map
• Comprehensive Sign Plan
ES.3 Project Objectives
Chapter 2, Project Description, describes the purpose of the Project and the Project’s underlying objectives. The objectives of the Project are:
• A Project that allows for the revitalization of the Project Site, adapting to changing market conditions and providing economic benefits to the City. • An infill development that promotes the sustainable principles of smart growth. • A Project that encourages and facilitates new uses of high-quality architecture and design.
• A mixture of commercial uses that provides new activity and services to the area and is cohesive with established neighborhoods, businesses, and community amenities nearby.
• Creation of new and future employment opportunities.
• A circulation system responsive to the needs of vehicular, bicycle, and pedestrian travel.
Riverview Marketplace Commercial Project
Environmental Impact Report Executive Summary
City of Bakersfield – SCH No. 2025101507 ES-3
• New native and drought-tolerant landscaping that visually enhances the Project Site and surrounding perimeter.
• A visually harmonious development as viewed both internally and externally.
ES.4 Areas of Controversy
The following lists potential environmental issues or concerns raised in response to the Notice of Preparation (NOP), and where these issues are addressed in the Draft EIR:
• Impacts from construction and operational emissions, addressed in Section 4.3, Air Quality;
• Impacts to biological resources, addressed in Section 4.4, Biological Resources; • Impacts to Tribal cultural resources, addressed in Section 4.5, Cultural Resources, and Section 4.17, Tribal Cultural Resources; and
• Impacts from blight, addressed in Section 4.11, Land Use and Planning.
Appendix A includes a copy of the NOP, NOP Presentation, and the comment letters received in response to the NOP. The issues raised during the NOP are addressed as part of the Draft EIR in the respective sections listed above. As described in the respective sections, the Project would be consistent with issues raised in the comment letters.
ES.5 Alternatives to the Proposed Project
This section of the Draft EIR considers three alternatives to the Project. These alternatives include:
• Alternative 1: No Build/No Project
• Alternative 2: Reduced Project Alternative
• Alternative 3: Existing General Plan/Zoning Alternative Consistent with CEQA Guidelines Section 15126.6(c), Alternatives 2 through 3 represent a range of reasonable “build” alternatives that could feasibly accomplish the project objectives discussed in Section 5.3, Project Objectives, and could potentially lessen the environmental impacts of the proposed Project. Per CEQA Guidelines Section 15126.6(e), the alternatives analysis includes the required “No Build/No Project” alternative. The purpose of describing and analyzing the “No Build/No Project” alternative is to allow decisionmakers the ability to compare the impacts of approving the proposed Project with the impacts of not approving the proposed Project.
Each of the three alternatives is described in greater detail in Chapter 5, Alternatives. Each alternative is described and evaluated in sufficient detail to determine whether the overall environmental impacts would be less than, similar to, or greater than the corresponding impacts of the Project. Furthermore, each alternative is evaluated to determine whether the Project objectives could be substantially attained by the alternative.
ES.5.1 Alternative 1: No Build/No Project
Pursuant to Section 15126.6(e)(3)(B) of the CEQA Guidelines, Alternative 1, the “No Project” Alternative, represents the circumstance under which the Project does not proceed. Under Riverview Marketplace Commercial Project
Environmental Impact Report Executive Summary
City of Bakersfield – SCH No. 2025101507 ES-4
Alternative 1 it is assumed that the existing state of the Project Site would remain as is and no new development would be implemented. As discussed in Chapter 2, Project Description, of this Draft EIR, the Project Site is located on a portion of a larger property formerly occupied by the PG&E Kern Power Plant. The Project Site is currently secured on all sides by a six-foott tall chain-link fencing, with vehicular access provided via gated unpaved entry drives along Coffee Frontage Road and one concrete paved driveway along Rosedale Highway. Both Coffee Road and Rosedale Highway are improved with concrete curb and gutters, yet only Rosedale Highway is fully developed with a concrete sidewalk. A portion of Coffee Road is improved with a concrete sidewalk. Existing onsite features include abandoned oil wells; electrical transmission lines on metal poles, towers, and wooden poles; and several dirt roads and mounds.
ES.5.2 Alternative 2: Reduced Project Alternative
Reduced Project Alternative assumes a 25% reduction of all proposed Project land uses.
Accordingly, the total commercial square footage would be reduced from 405,531 square feet to approximately 304,148 square feet, and the total number of dual-sided fuel pumps would be reduced from 20 to 15. The buildings would be constructed in the same general arrangement as currently proposed and set forth in the site plan, but with a smaller footprint. The areas not covered by buildings would be used for surface parking for passenger vehicles, and the site’s vehicular access would be the same general arrangement as currently proposed and set forth in the site plan. The development characteristics of this Reduced Project Alternative are assumed to be similar to those of the Project, including excavation and earth movement.
ES.5.3 Alternative 3: Existing General Plan/Zoning Alternative Under this alternative, it is assumed that the Project Site will be developed in accordance with the current Metropolitan Bakersfield General Plan (MBGP) land use and zoning designations. Thus, this alternative assumes the Project Site would be developed with a by-right use and no General Plan amendment or zone change would be necessary. The Project Site’s current Public Facilities (P) designation, as well as the prohibitions in the deed restriction and restrictive covenant that encumber the property, significantly limit the types of uses permitted on the Project Site. Based on the site’s Public Facilities designation, the allowed uses are limited to the following:
Public Facilities (P): includes government buildings, hospitals, public utilities, cemeteries, sewage treatment plants, waste disposal sites and other publicly owned facilities.
For purposes of the analysis, the maximum allowable development of the Project Site is in accordance with the MBGP. Based thereon, Alternative 3 would consist of a municipal maintenance and storage yard that serves as the central deployment hub for a public works department. This alternative development includes facilities for fleet maintenance, material storage, and administrative offices. All existing on-site uses, except the transmission facilities, would be removed to accommodate this alternative.
Under Alternative 3, the Project Site would be developed with approximately 100,900 square feet of commercial uses, consisting of office space to accommodate multiple divisions within a public works department (i.e. parks & rec, streets, solid waste). The Project Site would also be developed with industrial uses, including a 128,000 square foot fleet services building, approximately 30 acres of construction, equipment, and stockpile storage space, a 58,000 square foot laydown with Riverview Marketplace Commercial Project
Environmental Impact Report Executive Summary
City of Bakersfield – SCH No. 2025101507 ES-5
detention basin, and a 5,300 square foot fueling facility. This alternative will also include 335,000 square feet of employee parking.1
ES.5.4 Environmentally Superior Alternative
CEQA Guidelines Section 15126.6(e)(2) indicates that an analysis of alternatives to a proposed project shall identify an environmentally superior alternative among the alternatives evaluated in an EIR and that if the “no project” alternative is the environmentally superior alternative, the EIR shall identify another environmentally superior alternative among the remaining alternatives.
Selection of an environmentally superior alternative is based on comparison of the alternatives to determine which among the alternatives would reduce or eliminate the impacts associated with the Project to the greatest degree.
Of the alternatives analyzed in this Draft EIR, Alternative 1 would be considered the environmentally superior alternative because it would not involve new development and assumes that the Project Site would remain vacant under existing conditions. Although Alternative 1 would not meet any of the Project objectives, it would avoid all of the Project’s potentially significant impacts and significant and unavoidable impacts and would have reduced impacts compared to the Project. However, because Alternative 1 has been identified as the environmentally superior alternative, identification of another environmentally superior alternative is required.
Alternative 3, involving development of the Project Site in accordance with current land use and zoning designations, would reduce the Project’s significant and unavoidable VMT impacts and would reduce mitigation measures required for Air Quality. With the exception of Aesthetics impacts, all impacts would be reduced or would be similar to the Project.
However, Alternative 3 would not meet several objectives of the Project as it would not provide a new commercial development that would provide new activities, shopping, and services for residents. Alternative 3 would not generate new employment activities to the same extent as the Project, nor would it develop a new commercial development that would be harmonious with surrounding commercial development. Alternative 3 would not visually improve the Project Site to the same degree as the Project, as new landscaping, high quality commercial architecture, signage and other aesthetic improvements would not occur.
ES.6 Summary of Impacts
Based on the environmental analysis completed for the proposed Project and discussed in Chapter 4, Environmental Impact Analysis, significant and unavoidable impacts have been identified for the following environmental resource factors:
• Section 4.8, Greenhouse Gas Emissions
• Section 4.16, Transportation
Significant impacts requiring mitigation to reduce the impact to less than significant have been identified for the following environmental resource factors:
• Section 4.3, Air Quality
1 This alternative project was derived and scaled based on input from the City’s Public Works Department of desired improvements on a new 30-acre public works yard.
Riverview Marketplace Commercial Project
Environmental Impact Report Executive Summary
City of Bakersfield – SCH No. 2025101507 ES-6
• Section 4.4, Biological Resources
• Section 4.5, Cultural Resources
• Section 4.7, Geology and Soils
Less than significant impacts were identified in the following environmental resource factors:
• Section 4.1, Aesthetics
• Section 4.6, Energy
• Section 4.9, Hazards and Hazardous Materials
• Section 4.10, Hydrology and Water Quality
• Section 4.11, Land Use and Planning
• Section 4.13, Noise
• Section 4.14, Population and Housing
• Section 4.15, Public Services and Recreation
• Section 4.18, Utilities and Service Systems
No impacts were identified for the following environmental resource factors:
• Section 4.2, Agriculture and Forest Resources
• Section 4.12, Mineral Resources
• Section 4.19, Wildfire
ES.7 Review of the Draft EIR
Pursuant to Public Resources Code (PRC) Section 21161, upon completion of this Draft EIR, the City of Bakersfield prepared and filed a Notice of Completion (NOC) with the Governor’s Office of Planning and Research-State Clearinghouse to start the public review period. Concurrent with the NOC, the lead agency distributed a Notice of Availability (NOA) in accordance with CEQA Guidelines Section 15087. The NOA was mailed to the agencies, organizations, and individuals who previously requested in writing. This Draft EIR was distributed to responsible and trustee agencies, other affected agencies, surrounding cities and municipalities, and all interested parties requesting a copy of this document in accordance with PRC Section 21092(b)(3). During the public review period, this Draft EIR, including the appendices, is available for review at the following location:
City of Bakersfield
Development Services Department – Planning Division
1715 Chester Avenue, 2nd Floor
Bakersfield, CA 93301
Online: https://www.bakersfieldcity.us/279/Environmental-Documents Riverview Marketplace Commercial Project
Environmental Impact Report Executive Summary
City of Bakersfield – SCH No. 2025101507 ES-7
Agencies, organizations, individuals, and all other interested parties not previously contacted, or who did not respond to the NOP, currently have the opportunity to comment on this Draft EIR during the 45-day public review period. The written comments on this Draft EIR should be addressed to:
City of Bakersfield
Development Services Department – Planning Division
Attn: Ashley Knight, Assistant Planner
1715 Chester Avenue, 2nd Floor
Bakersfield, CA 93301
Email: [email protected]
Upon completion of the public review period, written responses to all substantive environmental comments will be prepared and made available for review at least 10 days prior to the public hearing on the proposed Project before the City of Bakersfield Planning Commission, at which the Final EIR will be considered and may be recommended for subsequent certification by the City of Bakersfield City Council. The comments received and the responses to those comments will be included as part of the record for consideration of the proposed Project.
ES.8 Summary of Environmental Impacts & Mitigation
Measures
Table ES-1, Summary of Significant Impacts and Proposed Mitigation Measures, is a summary of significant impacts and proposed mitigation measures associated with the Project as identified in this Draft EIR. Refer to Sections 4.1 through 4.19 in this Draft EIR for a detailed description of the environmental impacts and mitigation measures for the Project.
Riverview Marketplace Commercial Project
Environmental Impact Report Executive Summary
City of Bakersfield – SCH No. 2025101507 ES-8
This page intentionally left blank.
City of Bakersfield – SCH No. 2025101507 i
Table of Contents
ES EXECUTIVE SUMMARY...........................................................................................ES-1 ES.1 Purpose .........................................................................................................ES-1 ES.2 Proposed Project ...........................................................................................ES-1 ES.3 Project Objectives..........................................................................................ES-2 ES.4 Areas of Controversy .....................................................................................ES-3 ES.5 Alternatives to the Proposed Project ..............................................................ES-3 ES.5.1 Alternative 1: No Build/No Project.......................................................ES-3 ES.5.2 Alternative 2: Reduced Project Alternative..........................................ES-4 ES.5.3 Alternative 3: Existing General Plan/Zoning Alternative ......................ES-4 ES.5.4 Environmentally Superior Alternative..................................................ES-5 ES.6 Summary of Impacts ......................................................................................ES-5 ES.7 Review of the Draft EIR..................................................................................ES-6 ES.8 Summary of Environmental Impacts & Mitigation Measures...........................ES-7
1. INTRODUCTION..........................................................................................................1-1
1.1 Overview of the Proposed Project.....................................................................1-1
1.2 Purpose of the Environmental Impact Report (EIR)...........................................1-1
1.3 Environmental Review Process.........................................................................1-1
1.4 Scoping Process...............................................................................................1-2
1.4.1 Notice of Preparation.............................................................................1-2
1.4.2 Scoping Meeting....................................................................................1-2
1.5 Organization of the Draft EIR ............................................................................1-2
2. PROJECT DESCRIPTION ...........................................................................................2-1
2.1 Environmental Setting.......................................................................................2-1
2.1.1 Project Location.....................................................................................2-1
2.1.2 Existing Conditions................................................................................2-1
2.1.3 General Plan and Zoning.......................................................................2-1
2.2 Description of Project........................................................................................2-7
2.2.1 Project Overview ...................................................................................2-7 Riverview Marketplace Commercial Project
Environmental Impact Report Table of Contents
City of Bakersfield – SCH No. 2025101507 ii
2.2.2 Access, Circulation, and Parking .........................................................2-13
2.2.3 Pedestrian Access and Circulation ......................................................2-13
2.2.4 Loading and Deliveries ........................................................................2-13
2.2.5 Design Concept...................................................................................2-14
2.2.6 Open Space and Landscaping ............................................................2-14
2.2.7 Lighting and Signage...........................................................................2-21
2.2.8 Infrastructure Improvements................................................................2-21
2.2.9 Operational Hours ...............................................................................2-21
2.2.10 Sustainability Features ........................................................................2-21
2.3 Project Phasing and Construction ...................................................................2-22
2.4 Requested Permits and Approvals..................................................................2-22
3. ENVIRONMENTAL SETTING ......................................................................................... 3-1
3.1 Regional Setting................................................................................................3-1
3.2 Project Site Setting ...........................................................................................3-1
3.3 Cumulative Development..................................................................................3-1
4. ENVIRONMENTAL IMPACT ANALYSIS......................................................................... 4-1
4.1 Aesthetics ..................................................
4.2 Agriculture and Forest Resources..........
4.3 Air Quality ..............................................
4.4 Biological Resources .....................................................................................4.4-1
4.5 Cultural Resources ........................................................................................4.5-1
4.6 Energy ...........................................................................................................4.6-1
4.7 Geology and Soils..........................................................................................4.7-1
4.8 Greenhouse Gas Emissions..........................................................................4.8-1
4.9 Hazards and Hazardous Materials .................................................................4.9-1
4.10 Hydrology and Water Quality .......................................................................4.10-1
4.11 Land Use and Planning................................................................................4.11-1
4.12 Mineral Resources.......................................................................................4.12-1
4.13 Noise ...........................................................................................................4.13-1
4.14 Population and Housing...............................................................................4.14-1 ..................................................... .........4.1-1 1 .........4.2-1
.........4.3-1
1 1
............................. .........
............................. .........
............................. .........
............................. .........
Riverview Marketplace Commercial Project
Environmental Impact Report Table of Contents
City of Bakersfield – SCH No. 2025101507 iii
4.15 Public Services and Recreation ...................................................................4.15-1
4.16 Transportation..............................................................................................4.16-1
4.17 Tribal Cultural Resources.............................................................................4.17-1
4.18 Utilities and Service Systems.......................................................................4.18-1
4.19 Wildfire.........................................................................................................4.19-1
5. ALTERNATIVES ............................................................................................................. 5-1
5.1 Introduction.......................................................................................................5-1
5.2 Project Summary ..............................................................................................5-1
5.3 Project Objectives.............................................................................................5-2
5.4 Project Impacts .................................................................................................5-2
5.5 Summary of Project Alternatives .......................................................................5-3
5.5.1 Alternative 1: No Build/No Project..........................................................5-4
5.5.2 Alternative 2: Reduced Project Alternative...........................................5-15
5.5.3 Alternative 3: Existing General Plan/Zoning Alternative .......................5-25
5.6 Alternatives Considered but Rejected .............................................................5-35
5.6.1 Alternative Site ....................................................................................5-35
5.7 Environmentally Superior Alternative ..............................................................5-36
6. OTHER CEQA CONSIDERATIONS................................................................................ 6-1
6.1 Significant and Unavoidable Impacts ................................................................6-1
6.2 Irreversible Environmental Changes .................................................................6-1
6.3 Growth-Inducing Impacts ..................................................................................6-3
7. REFERENCES................................................................................................................ 7-1
8. LIST OF PREPARERS.................................................................................................... 8-1
8.1 Lead Agency.....................................................................................................8-1
8.2 EIR Preparers ...................................................................................................8-1
8.3 Technical Subconsultants .................................................................................8-1 Riverview Marketplace Commercial Project
Environmental Impact Report Table of Contents
City of Bakersfield – SCH No. 2025101507 iv
Tables
Table ES-1: Summary of Impacts and Mitigation Measures ..................................................ES-9 Table 2-1: Proposed Uses........................................................................................................2-7 Table 2-2: Matrix of Project Approvals/Permits.......................................................................2-23 Table 3-1: Cumulative Projects List..........................................................................................3-2 Table 4.3-1: Ambient Air Quality Standards for Criteria Pollutants.........................................4.3-2 Table 4.3-2: Attainment Status of Criteria Pollutants in the San Joaquin Valley Air Basin ...4.3-18 Table 4.3-3: Ambient Air Quality Monitoring Summary ........................................................4.3-19 Table 4.3-4: SJVAPCD Regional Criteria Pollutants Significance Thresholds .....................4.3-20 Table 4.3-5: Ambient Air Quality Thresholds .......................................................................4.3-21 Table 4.3-6: SJVAPCD Significant Impact Levels ...............................................................4.3-21 Table 4.3-7: SJVAPCD Screening Levels for Potential Odor Sources.................................4.3-22 Table 4.3-8: SJVAPCD Toxic Air Contaminants Incremental Risk Thresholds ....................4.3-23 Table 4.3-9: Annual Regional Construction Emissions ........................................................4.3-26 Table 4.3-10: Average Daily Construction-Related Emissions.............................................4.3-27 Table 4.3-11: Annual Regional Operation Emissions ..........................................................4.3-28 Table 4.3-12: Average Daily Operation-Related Emissions.................................................4.3-28 Table 4.3-13: Ambient Air Quality Analysis Summary .........................................................4.3-29 Table 4.3-14: Comparison of Concentrations to Significant Impact Levels ..........................4.3-29 Table 4.3-15: Annual Regional Operation Emissions With Mitigation ..................................4.3-30 Table 4.3-16: Construction Risk Summary ..........................................................................4.3-32 Table 4.4-1: Threatened, Endangered, Candidate, or 1B.1 Ranked Plant Species ...............4.4-8 Table 4.4-2: Threatened, Endangered, or Candidate Wildlife Species...................................4.4-9 Table 4.5-1: Recorded Cultural Resources at Project Site ..................................................4.5-16 Table 4.5-2: California Register Eligibility Evaluation...........................................................4.5-17 Table 4.6-1: Construction-Related Fuel Usage......................................................................4.6-8 Table 4.6-2: Project Electricity Demand ................................................................................4.6-9 Table 4.6-3: Project Natural Gas Demand...........................................................................4.6-10 Table 4.6-4: Project Annual Operation-Related Fuel Usage................................................4.6-11 Riverview Marketplace Commercial Project
Environmental Impact Report Table of Contents
City of Bakersfield – SCH No. 2025101507 v
Table 4.8-1: GHG Emissions and Their Relative Global Warming Potential Compared to CO2................................................................................................................4.8-12 Table 4.8-2: Project Operation GHG Emissions Inventory...................................................4.8-18 Table 4.8-3: Project Operation GHG Emissions Inventory With Reduction Measures GHG-1 and GHG-3 .............................................................................................................4.8-21 Table 4.9-1 Current Adjacent Land Uses ..............................................................................4.9-9 Table 4.9-2: Historical Land Uses .......................................................................................4.9-10 Table 4.11-1: General Plan Consistency...........................................................................4.11-10 Table 4.13-1: Typical Noise Levels .....................................................................................4.13-4 Table 4.13-2: Human Reaction to Typical Vibration Levels ................................................4.13-5 Table 4.13-3: Exterior Stationary Noise Standards..............................................................4.13-7 Table 4.13-4: Long-Term Noise Measurement Summary....................................................4.13-9 Table 4.13-5: Short-Term Noise Measurements Summary in A-Weighted Sound Levels ....4.13-9 Table 4.13-6: Groundborne Vibration Criteria: Architectural Damage ................................4.13-11 Table 4.13-7: Groundborne Annoyance Criteria ................................................................4.13-12 Table 4.13-8: Phase 1 Project-Related Construction Noise, dBA Leq.................................4.13-14 Table 4.13-9: Phase 2 Project-Related Construction Noise, dBA Leq.................................4.13-14 Table 4.13-10: Project and Cumulative Traffic Noise Increase ..........................................4.13-17 Table 4.13-11: Attenuated Noise Levels at Sensitive Receptors, dBA Lmax........................4.13.20 Table 4.13-12: Vibration Levels for Phase 1 Construction Equipment (in/sec PPV) ..........4.13-22 Table 4.13-13: Vibration Levels for Phase 2 Construction Equipment (in/sec PPV) ..........4.13.23 Table 4.13-14: Vibration Levels for Phase 1 Construction Equipment (VdB)......................4.13.23 Table 4.13-15: Vibration Levels for Phase 2 Construction Equipment (VdB)......................4.13.24 Table 4.14-1: Population Projections for Kern County and the City of Bakersfield ...............4.14-5 Table 4.14-2: Households in Kern County and the City of Bakersfield .................................4.14-5 Table 4.14-3: Kern County and City of Bakersfield 6th Cycle RHNA.....................................4.14-5 Table 4.14-4: Employment in Kern County and the City of Bakersfield ................................4.14-6 Table 4.16-1: Project Employment Estimation .....................................................................4.16-6 Table 4.16-2: Project Trip Generation................................................................................4.16-10 Table 4.16-3: Retail Land Uses Project VMT.....................................................................4.16-15 Table 4.16-4: Medical Office Land Use Project VMT .........................................................4.16-15 Riverview Marketplace Commercial Project
Environmental Impact Report Table of Contents
City of Bakersfield – SCH No. 2025101507 vi
Table 4.18-1: Project Water Demand.................................................................................4.18-11 Table 4.18-2: Current and Projected Potable Water Demands for the Domestic Water System (afy) ..................................................................................................................................4.18-11 Table 4.18-3: Current and Projected Potable Water Demands for the Wholesale Water System (afy) ..................................................................................................................................4.18-11 Table 4.18-4: Actual Water Supplies for the Domestic Water System (afy)........................4.18-12 Table 4.18-5: Normal, Single Dry, and Multiple Dry Year Supply and Demand for the Domestic Water System (afy)......................................................................................4.18-12 Table 5-1: Comparison of the Impacts of the Project and Alternatives ....................................5-37 Figures
Figure 2-1: Regional Location Map ..........................................................................................2-3 Figure 2-2: Local Vicinity Map..................................................................................................2-5 Figure 2-3: Site Plan ................................................................................................................2-9 Figure 2-4: Site Plan Phasing.................................................................................................2-11 Figure 2-5: Renderings ..........................................................................................................2-15 Figure 2-6: Landscape Concept Plan .....................................................................................2-17 Figure 2-7: Street Frontage Enlargements .............................................................................2-19 Figure 4.1-1: Photos of the Project Site from Coffee Road....................................................4.1-5 Figure 4.1-2: Photo of the Project Site from Rosedale Highway Viewing Southwest .............4.1-7 Figure 4.1-3: Photo of the Project Site from El Toro Viejo Road Viewing Northeast ..............4.1-9 Appendices
Appendix A: Notice of Preparation and Notice of Preparation Comments Appendix A-1: Notice of Preparation and Notice of Preparation Presentation Appendix A-2: Notice of Preparation Comments
Appendix B: Air Quality, Greenhouse Gas Emissions, and Energy Technical Study Appendix C: General Biological Assessment
Appendix D: Cultural Resources Assessment
Appendix E: Geotechnical Investigation
Appendix F: Hazards and Hazardous Materials Supporting Information Riverview Marketplace Commercial Project
Environmental Impact Report Table of Contents
City of Bakersfield – SCH No. 2025101507 vii
Appendix F-1: Phase I ESA
Appendix F-2: Engineering Review of Plugged and Abandoned Oil and Gas Wellbores Appendix G: Noise and Vibration Technical Study
Appendix H: Transportation Analysis and Vehicle Miles Traveled Analysis Appendix H-1: Transportation Analysis
Appendix H-2: Vehicle Miles Traveled Analysis
Appendix I: Utilities and Hydrology
Appendix I-1: Water Supply and Demand Analysis
Appendix I-2: Drainage Study
Appendix I-3: Sewer Area Study
Appendix J: Urban Decay Analysis Technical Memorandum
Appendix K: Tribal Correspondence
Riverview Marketplace Commercial Project
Environmental Impact Report Table of Contents
City of Bakersfield – SCH No. 2025101507 viii
This page intentionally left blank.
Riverview Marketplace Commercial Project
Environmental Impact Report Executive Summary
City of Bakersfield – SCH No. 2025101507 ES-9
Table ES-1: Summary of Impacts and Mitigation Measures
Threshold Project Design Features and Mitigation Measures Level of Significance
Level of
Significance
After Mitigation
Section 4.1: Aesthetics
AES-1: Would the project have a substantial adverse effect on a scenic vista?
None required Less Than
Significant N/A
AES-2: Would the project substantially damage scenic
resources, including, but not limited to, trees, rock
outcroppings, and historic buildings within a state scenic highway?
None required Less Than
Significant N/A
AES-3: Would the project, if in nonurbanized areas,
substantially degrade the existing visual character or quality of public views of the site and its surroundings? (Public views are those that are experienced from publicly accessible vantage point). If the project is in an urbanized area, would the project conflict with applicable zoning and other
regulations governing scenic quality?
None required Less Than
Significant N/A
AES-4: Would the project create a new source of substantial light or glare which would adversely affect day or nighttime views in the area?
None required Less Than
Significant N/A
Section 4.2: Agriculture and Forestry Resources
AG-1: Would the project convert Prime Farmland, Unique
Farmland, or Farmland of Statewide Importance (Farmland), as shown on the maps prepared pursuant to the Farmland
Mapping and Monitoring Program of the California
Resources Agency, to non-agricultural use?
None required No Impact N/A
AG-2: Would the project conflict with existing zoning for agricultural use, or a Williamson Act contract?
None required No Impact N/A
AG-3: Would the project conflict with existing zoning for, or cause rezoning of, forest land (as defined in Public
Resources Code Section 12220(g)), timberland (as defined by Public Resources Code Section 4526), or timberland
zoned Timberland Production (as defined by Government
Code Section 51104(g))?
None required No Impact N/A
AG-4: Would the project result in the loss of forest land or conversion of forest land to non-forest use?
None required No Impact N/A
AG-5: Would the project Involve other changes in the existing environment which, due to their location or nature, could result in conversion of Farmland, to non-agricultural use or conversion of forest land to non-forest use?
None required No Impact N/A
Riverview Marketplace Commercial Project
Environmental Impact Report Executive Summary
City of Bakersfield – SCH No. 2025101507 ES-10
Table ES-1: Summary of Impacts and Mitigation Measures
Threshold Project Design Features and Mitigation Measures Level of Significance
Level of
Significance
After Mitigation
Section 4.3: Air Quality
AQ-1: Would the project conflict with or obstruct
implementation of the applicable air quality plan?
MM AQ-1: Prior to issuance of building permits, the project applicant shall enter into a Voluntary Emission Reduction Agreement (VERA) with the San Joaquin Valley Air Pollution Control District (SJVAPCD) to mitigate regional air quality impacts associated with emissions of VOC and NOX
generated by operation of the proposed project. At minimum, the VERA shall be crafted and shown to mitigate project-related operation emissions to below the SJVAPCD regional significance thresholds for VOC and NOX. Prior to the
issuance of building permits, the project applicant shall provide documentation to the City of Bakersfield Development Services Department (City), that verifies, to the City’s satisfaction, completion of the VERA.
MM AQ-2: The project proponent/developer shall use paints and coatings with a VOC content of 25 grams per liter or less for all initial and future exterior coating and recoating of structures including parking lot striping. This reduced VOC content requirement shall be incorporated into all site plans and appropriate construction documents (e.g., construction management plan) and submitted to the City of Bakersfield Development Services Department.
MM GHG-1
MM GHG-2
MM GHG-3
Potentially
Significant
Less Than
Significant with
Mitigation
Incorporated
AQ-2: Would the project result in a cumulatively considerable net increase of any criteria pollutant for which the project region is in non-attainment under an applicable federal or state ambient air quality standard?
MM AQ-1
MM AQ-2
MM GHG-1
MM GHG-2
MM GHG-3
Potentially
Significant
Less Than
Significant with
Mitigation
Incorporated
AQ-3: Would the project expose sensitive receptors to
substantial pollutant concentrations?
None required Less Than
Significant N/A
AQ-4: Would the project result in other emissions (such as those leading to odors) adversely affecting a substantial number of people?
None required Less Than
Significant N/A
Riverview Marketplace Commercial Project
Environmental Impact Report Executive Summary
City of Bakersfield – SCH No. 2025101507 ES-11
Table ES-1: Summary of Impacts and Mitigation Measures
Threshold Project Design Features and Mitigation Measures Level of Significance
Level of
Significance
After Mitigation
Section 4.4: Biological Resources
BIO-1: Would the project have a substantial adverse effect, either directly or through habitat modifications, on any species identified as a candidate, sensitive, or special status species in local or regional plans, policies, or regulations, or by the California Department of Fish and Wildlife or U.S. Fish and Wildlife Service?
MM BIO-1: Burrowing Owl (BUOW) Pre-Construction
Surveys. Prior to the commencement of ground-disturbing or vegetation-clearing activities, the project applicant/developer shall retain a qualified biologist to conduct pre-construction surveys for BUOW (Athene cunicularia) in accordance with the California Department of Fish and Wildlife (CDFW) 2012 Staff Report on Burrowing Owl Mitigation (CDFG 2012).
Depending on the time elapsed between the focused surveys conducted in support of the analysis conducted as a part of the biological resource assessment and the start of
construction, additional focused surveys may be required during the survey season immediately preceding
construction. As specified in the 2012 Staff Report, one 30- day pre-construction survey is recommended; however,
multiple surveys may be necessary prior to construction to determine presence or absence, and burrowing owls may
colonize a site following previous negative survey results.
Therefore, the project site shall be monitored 30 days prior to ground disturbance to detect any occupancy prior to
construction activities.
MM BIO-2: Burrowing Owl (BUOW) Avoidance Buffer. If
western burrowing owls or occupied or unoccupied burrows are detected during pre-construction surveys or at any time during construction, no-disturbance buffers shall be
established by the qualified biologist in accordance with the California Department of Fish and Wildlife (CDFW) 2012 Staff Report on Burrowing Owl Mitigation (CDFG 2012). Buffer
distances (50 – 500 meters) shall be based on the season (breeding or non-breeding), level of owl activity, and the type and intensity of proposed construction activities. These buffers shall remain in place until the qualified biologist determines that the burrow is no longer occupied, the owls have fledged and are no longer dependent on the burrow, or CDFW-approved passive relocation procedures have been
completed. The qualified biologist shall monitor compliance with the buffer requirements and shall have the authority to Potentially
Significant
Less Than
Significant with
Mitigation
Incorporated
Riverview Marketplace Commercial Project
Environmental Impact Report Executive Summary
City of Bakersfield – SCH No. 2025101507 ES-12
Table ES-1: Summary of Impacts and Mitigation Measures
Threshold Project Design Features and Mitigation Measures Level of Significance
Level of
Significance
After Mitigation
halt work if project activities are causing disturbance to western burrowing owls.
MM BIO-3: Nesting Birds. If ground disturbing and
vegetation clearing activities cannot be avoided during the nesting bird season (February 1 through September 15), a qualified biologist shall conduct a pre-construction nesting bird survey within all areas of breeding and nesting habitat within and adjacent to the Project Site no more than 10 days prior to initiation of Project activities that would remove vegetation or otherwise disturb nesting activity (for instance, mobilization of heavy equipment) of all areas of the Project Site that could be directly or indirectly impacted by
construction activity.
If nesting birds are encountered, the qualified biologist shall establish a baseline for the behavior of any identified nests and shall continuously monitor the nests to detect changes in behavior. Should behavioral changes occur, the Project
proponent shall halt construction work causing that change and consult with the California Department of Fish and Wildlife for additional avoidance and minimization measure.
If continuous monitoring of the identified nests by a qualified biologist is not feasible, a qualified biologist shall establish an avoidance buffer zone around the nest, which shall be
determined by the qualified biologist according to species involved. At a minimum, a no-disturbance buffer of 250 feet shall be established around active nests of non-listed bird species and a 500-foot no-disturbance buffer shall be
established around active nests of non-listed raptors. No activities that would adversely affect the nest shall occur within the buffer zone until the qualified biologist has determined the nest is no longer active, breading season is over, or the young are no longer dependent on the nest.
BIO-2: Would the project have a substantial adverse effect on any riparian habitat or other sensitive natural community identified in local or regional plans, policies, regulations or by None required No Impact N/A
Riverview Marketplace Commercial Project
Environmental Impact Report Executive Summary
City of Bakersfield – SCH No. 2025101507 ES-13
Table ES-1: Summary of Impacts and Mitigation Measures
Threshold Project Design Features and Mitigation Measures Level of Significance
Level of
Significance
After Mitigation
the California Department of Fish and Wildlife or U.S. Fish and Wildlife Service?
BIO-3: Would the project have a substantial adverse effect on state or federally protected wetlands (including, but not limited to, marsh, vernal pool, coastal, etc.) through direct removal, filling, hydrological interruption, or other means? None required No Impact N/A
BIO-4: Would the project interfere substantially with the movement of any native resident or migratory fish or wildlife species or with established native resident or migratory wildlife corridors, or impede the use of native wildlife nursery sites?
None required No Impact N/A
BIO-5: Would the project conflict with any local policies or ordinances protecting biological resources, such as a tree preservation policy or ordinance?
MM BIO-1
MM BIO-2
MM BIO-3
Potentially
Significant
Less Than
Significant with
Mitigation
Incorporated
BIO-6: Would the project conflict with the provisions of an adopted Habitat Conservation Plan, Natural Community
Conservation Plan, or other approved local, regional, or state habitat conservation plan?
None required No Impact N/A
Section 4.5: Cultural Resources
CUL-1: Would the project cause a substantial adverse
change in the significance of a historical resource pursuant to § 15064.5?
None required Less Than
Significant N/A
CUL-2: Would the project cause a substantial adverse
change in the significance of an archaeological resource pursuant to § 15064.5?
MM CUL-1: Inadvertent Discovery of Cultural Resources.
If suspected cultural resources are encountered during
ground disturbance activities, all work within 100 feet of the find shall immediately cease and the area cordoned off until a qualified cultural resource specialist that meets the Secretary of the Interior’s Professional Qualification Standards can evaluate the find and make recommendations. If the specialist determines that the discovery represents a potentially
significant cultural resource, additional investigations may be required. If cultural resources are discovered that may have relevance to Native Americans, the specialist or Project Applicant shall provide written notice to the City of Bakersfield, Native American Heritage Commission, and any other
appropriate individuals, agencies, and/or groups as
determined by the specialist in consultation with the City of Bakersfield to receive input regarding treatment and
Potentially
Significant
Less Than
Significant with
Mitigation
Incorporated
Riverview Marketplace Commercial Project
Environmental Impact Report Executive Summary
City of Bakersfield – SCH No. 2025101507 ES-14
Table ES-1: Summary of Impacts and Mitigation Measures
Threshold Project Design Features and Mitigation Measures Level of Significance
Level of
Significance
After Mitigation
disposition of the resource, which may include avoidance, testing, and/or excavation to prevent destruction of the resource and/or to allow documentation of the resource for research potential. All reports, correspondence, and
determinations regarding the discovery shall be submitted to the California Historical Resources Information System’s Southern San Joaquin Valley Information Center at California State University Bakersfield.
CUL-3: Would the project disturb any human remains,
including those interred outside of dedicated cemeteries? MM CUL-2: Inadvertent Discovery of Human Remains.
During construction, if human remains are discovered, further ground disturbance shall be prohibited pursuant to California Health and Safety Code Section 7050.5. The specific
protocol, guidelines, and channels of communication outlined by the Native American Heritage Commission, in accordance with Health and Safety Code Section 7050.5, Public
Resources Code 5097.97, and Senate Bill 447 shall be
followed. In the event of the discovery of human remains, at the direction of the county coroner, Health and Safety Code Section 7050.5(c) shall guide Native American consultation.
Unless otherwise required by law, the site of any reburial of Native American human remains or associated grave goods shall not be disclosed and shall not be governed by public disclosure requirements of the California Public Records Act.
The coroner, pursuant to the specific exemption set forth in California Government Code Section 6254 (r), parties, and Lead Agencies, will be asked to withhold public disclosure information related to such reburial, pursuant to the specific exemption set forth in California Government Code Section 6254 (r).
Potentially
Significant
Less Than
Significant with
Mitigation
Incorporated
Section 4.6: Energy
ENG-1: Would the project result in potentially significant environmental impact due to wasteful, inefficient, or
unnecessary consumption of energy resources, during
project construction or operation?
None required Less Than
Significant N/A
ENG-2: Would the project conflict with or obstruct a state or local plan for renewable energy or energy efficiency?
None required Less Than
Significant N/A
Section 4.7: Geology and Soils
GEO-1: Would the project directly or indirectly cause
potential substantial adverse effects, including the risk of None required Less Than Significant N/A Riverview Marketplace Commercial Project
Environmental Impact Report Executive Summary
City of Bakersfield – SCH No. 2025101507 ES-15
Table ES-1: Summary of Impacts and Mitigation Measures
Threshold Project Design Features and Mitigation Measures Level of Significance
Level of
Significance
After Mitigation
loss, injury, or death involving rupture of a known earthquake fault, as delineated on the most recent Alquist-Priolo
Earthquake Fault Zoning Map, issued by the State Geologist for the area or based on other substantial evidence of a known fault or strong seismic ground shaking?
GEO-2: Would the project expose people or structures to potential substantial adverse effects, including the risk of loss, injury, or death involving seismic-related ground failure including liquefaction?
None required Less Than
Significant N/A
GEO-3: Would the project expose people or structures to potential substantial adverse effects, including the risk of loss, injury, or death involving landslides?
None required No Impact N/A
GEO-4: Would the project result in substantial soil erosion or the loss of topsoil?
None required Less Than
Significant N/A
GEO-5: Would the project be located on a geologic unit or soil that is unstable, or that would become unstable as a result of the project, and potentially result in on- or off-site landslide, lateral spreading, subsidence, liquefaction or collapse?
None required Less Than
Significant N/A
GEO-6: Would the project be located on expansive soil, as defined in Table 18-1-B of the Uniform Building Code (1994), creating substantial risks to life or property?
None required Less Than
Significant N/A
GEO-7: Would the project have soils incapable of adequately supporting the use of septic tanks or alternative wastewater disposal systems where sewers are not available for the disposal of wastewater?
None required No Impact N/A
GEO-8: Would the project directly or indirectly destroy a unique paleontological resource or site or unique geologic feature?
MM GEO-1: Paleontological Discovery and Monitoring. In
the event paleontological resources, including fossil
discoveries, are encountered during construction of the Project, work shall halt within a 50-foot radius of the find and the City shall be immediately informed of the discovery. A qualified paleontologist shall be retained by the Applicant to evaluate the find before restarting work in the area. A qualified paleontologist is a paleontologist who meets the Society of Vertebrate Paleontology (SVP) standards for Qualified
Professional Paleontologist, which is defined as an individual preferably with an M.S. or Ph.D. in paleontology or geology, who is experienced with paleontological procedures and
techniques, who is knowledgeable in the geology of California Potentially
Significant
Less Than
Significant with
Mitigation
Incorporated
Riverview Marketplace Commercial Project
Environmental Impact Report Executive Summary
City of Bakersfield – SCH No. 2025101507 ES-16
Table ES-1: Summary of Impacts and Mitigation Measures
Threshold Project Design Features and Mitigation Measures Level of Significance
Level of
Significance
After Mitigation
(preferably Southern California), and who has worked as a paleontological mitigation Project supervisor for a least one year. The City shall require that all paleontological resources identified on the Project site be assessed and treated in a manner determined by the qualified paleontologist. The
qualified paleontologist shall be empowered to halt or divert ground disturbing activities.
If the discoveries are determined to be significant, full-time paleontological monitoring will be recommended for the
remainder of ground disturbance for the Project.
Paleontological monitoring shall entail the visual inspection of excavated or graded areas and trench sidewalls. In the event that any additional paleontological resources are discovered, the monitor shall have the authority to temporarily divert the construction equipment around the find until it is assessed for scientific significance and collected, if warranted. Monitoring efforts can be reduced or eliminated at the discretion of the project paleontologist.
Upon completion of fieldwork, all significant fossils collected shall be prepared in a properly equipped paleontology
laboratory to a point ready for curation. Following laboratory work, all fossil specimens shall be identified to the most specific taxonomic level possible, cataloged, analyzed, and first offered to the Buena Vista Museum then offered to the Natural History Museum of Los Angeles County for
permanent curation and storage. At the conclusion of
laboratory work and museum curation, a final Paleontological Monitoring Report (PMR) shall be prepared describing the results of the paleontological mitigation monitoring efforts associated with the Project. The report shall include a summary of the field and laboratory methods, an overview of the project area geology and paleontology, a list of taxa recovered, an analysis of fossils recovered and their scientific significance, and recommendations. A copy of the report shall also be submitted to the Buena Vista Museum in Bakersfield.
Riverview Marketplace Commercial Project
Environmental Impact Report Executive Summary
City of Bakersfield – SCH No. 2025101507 ES-17
Table ES-1: Summary of Impacts and Mitigation Measures
Threshold Project Design Features and Mitigation Measures Level of Significance
Level of
Significance
After Mitigation
Section 4.8: Greenhouse Gas Emissions
GHG-1: Would the project generate greenhouse gas
emissions, either directly or indirectly, that may have a significant impact on the environment?
GHG-1: The project proponent/developer shall design and construct the proposed buildings to be all electric, with electricity to be the only permanent source of energy for all nonemergency building energy needs, including but not
limited to water heating; mechanical equipment; and heating, ventilation, and air conditioning (HVAC) (i.e., space-heating and space cooling). All major appliances (e.g., dishwashers, refrigerators, and water heaters) provided/installed shall be electric-powered EnergyStar certified or an equivalent energy efficiency where applicable. The only exception to this measure shall be limited to commercial cooking uses. Prior to issuance of building permits for development projects, project proponent/developer shall provide plans that show the
aforementioned requirements to the City of Bakersfield
Building Division. Prior to issuance of the certificate of occupancy, the City of Bakersfield Building Division shall verify installation of the electric-powered EnergyStar or equivalent appliances.
GHG-2: Prior to issuance of the certificate of occupancy, the property owner shall provide documentation to the City of Bakersfield Building Division demonstrating enrollment in a 100 percent carbon-free electricity energy plan, such as the Pacific Gas & Electric’s (PG&E) 100% Solar Choice plan, for proposed project building(s) if such plan is available. If a 100 percent carbon-free electricity plan is not available, the property owner shall enroll in an energy plan with the next highest carbon-free electricity until a 100 percent carbon-free electricity energy plan becomes available. Measures to
achieve 100 percent carbon-free electricity use may include, but are not limited to, plans for 100 percent renewable electricity. If such carbon-free electricity energy plans are waitlisted, the property owner may enroll in an available energy plan in the meantime but shall sign up for the waiting list for and enroll in a carbon-free electricity energy plan when it becomes available.
Potentially
Significant
Significant and
Unavoidable
Riverview Marketplace Commercial Project
Environmental Impact Report Executive Summary
City of Bakersfield – SCH No. 2025101507 ES-18
Table ES-1: Summary of Impacts and Mitigation Measures
Threshold Project Design Features and Mitigation Measures Level of Significance
Level of
Significance
After Mitigation
GHG-3: All landscaping equipment (e.g., leaf blower) used for property management shall be electric-powered only. Prior to issuance of the first certificate of occupancy, the property owner shall provide documentation (e.g., purchase, rental, and/or services agreement) to the City of Bakersfield Building Division to verify that all landscaping equipment utilized will be electric-powered.
GHG-4: Any off-road equipment (e.g., forklifts) used in daily business operations shall be electric-powered. The project proponent/developer shall disclose this requirement to all tenants/business entities prior to the signing of any lease agreement. In addition, the limitation to use only electric-powered off-road equipment shall be included in all leasing agreements.
Prior to issuance of a Business License for a new
tenant/business entity, the project proponent/developer and tenant/business entity shall provide a signed document
(verification document) to the City of Bakersfield (City) noting that the property owner has disclosed to the tenant/business entity the requirement to use only electric-powered equipment for daily operations. This verification document shall be signed by authorized agents for the project
proponent/developer and tenant/business entities. In addition, if applicable, the tenant/business entity shall provide documentation (e.g., purchase or rental agreement) to the City to verify, to the City’s satisfaction, that any off-road equipment utilized will be electric-powered.
GHG-5: The project proponent/developer shall coordinate with Golden Empire Transit and provide improvements (e.g., bus shelter) of up to two bus stops. Prior to issuance of the first certificate of occupancy, the project proponent/developer shall provide documentation to the City of Bakersfield Building Division to verify, to the City’s satisfaction, that coordination with Golden Empire Transit has been initiated.
Riverview Marketplace Commercial Project
Environmental Impact Report Executive Summary
City of Bakersfield – SCH No. 2025101507 ES-19
Table ES-1: Summary of Impacts and Mitigation Measures
Threshold Project Design Features and Mitigation Measures Level of Significance
Level of
Significance
After Mitigation
GHG-6: The project proponent/developer shall install an end-of-trip shower facility. This end-of-trip shower facility requirement shall be incorporated into all site plans and appropriate building plans and submitted to the City of Bakersfield Building Division. Prior to issuance of the certificate of occupancy, the City of Bakersfield Building Division shall verify the installation of end-of-trip shower facility.
GHG-7: The project proponent/developer shall design the parking areas to comply with the Tier 2 Nonresidential
Voluntary Measures of the California Green Building
Standards Code (CALGreen), Division A5.1, Planning and
Design, Section A5.106.5.3.4. This requirement shall be identified on all prepared building and site plans. The project proponent/developer shall submit these building and site plans that note this requirement to the City of Bakersfield Building Division prior to the issuance of construction permits.
GHG-2: Would the project conflict with an applicable plan, policy or regulation adopted for the purpose of reducing the emissions of greenhouse gases?
MM GHG-5
MM GHG-6
Potentially
Significant
Significant and
Unavoidable
Section 4.9: Hazards and Hazardous Materials
HAZ-1: Would the project create a significant hazard to the public or the environment through the routine transport, use, or disposal of hazardous materials?
None required Less Than
Significant N/A
HAZ-2: Would the project create a significant hazard to the public or the environment through reasonably foreseeable upset and accident conditions involving the release of
hazardous materials into the environment?
None required Less Than
Significant N/A
HAZ-3: Would the project emit hazardous emissions or
handle hazardous or acutely hazardous materials,
substances, or waste within one-quarter mile of an existing or proposed school
None required Less Than
Significant N/A
HAZ-4: Would the project be located on a site which is
included on a list of hazardous materials sites compiled pursuant to Government Code § 65962.5 and, as a result, would it create a significant hazard to the public or the environment?
None required Less Than
Significant N/A
Riverview Marketplace Commercial Project
Environmental Impact Report Executive Summary
City of Bakersfield – SCH No. 2025101507 ES-20
Table ES-1: Summary of Impacts and Mitigation Measures
Threshold Project Design Features and Mitigation Measures Level of Significance
Level of
Significance
After Mitigation
HAZ-5: For a project located within an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, would the project result in a safety hazard or excessive noise for people residing or working in the project area?
None required No Impact N/A
HAZ-6: Would the project impair implementation of or
physically interfere within an adopted emergency response plan or emergency evacuation plan?
None required No Impact N/A
HAZ-7: Would the project expose people or structures, either directly or indirectly, to a significant risk of loss, injury or death involving wildfires?
None required Less Than
Significant N/A
Section 4.10: Hydrology and Water Quality
HWQ-1: Would the project violate any water quality
standards or waste discharge requirements or otherwise
substantially degrade surface or ground water quality?
None required Less Than
Significant N/A
HWQ-2: Would the project substantially decrease
groundwater supplies or interfere substantially with
groundwater recharge such that the project may impede
sustainable groundwater management of the basin?
None required Less Than
Significant N/A
HWQ-3a: Would the project substantially alter the existing drainage pattern of the site or area, including through the alteration of the course of a stream or river or through the addition of impervious surfaces, in a manner which would result in substantial erosion or siltation on- or off-site? None required Less Than
Significant N/A
HWQ-3b: Would the project substantially alter the existing drainage pattern of the site or area, including through the alteration of the course of a stream or river or through the addition of impervious surfaces, in a manner which would substantially increase the rate or amount of surface runoff in a manner which would result in flooding on- or off-site? None required Less Than
Significant N/A
HWQ-3c: Would the project substantially alter the existing drainage pattern of the site or area, including through the alteration of the course of a stream or river or through the addition of impervious surfaces, in a manner which would create or contribute runoff water which would exceed the capacity of existing or planned stormwater drainage systems or provide substantial additional sources of polluted runoff? None required Less Than
Significant N/A
HWQ-3d: Would the project substantially alter the existing drainage pattern of the site or area, including through the None required Less Than Significant N/A
Riverview Marketplace Commercial Project
Environmental Impact Report Executive Summary
City of Bakersfield – SCH No. 2025101507 ES-21
Table ES-1: Summary of Impacts and Mitigation Measures
Threshold Project Design Features and Mitigation Measures Level of Significance
Level of
Significance
After Mitigation
alteration of the course of a stream or river or through the addition of impervious surfaces, in a manner which would impede or redirect flood flows?
HWQ-4: Would the project if in flood hazard, tsunami, or seiche zones, risk the release of pollutants due to project inundation?
None required Less Than
Significant N/A
HWQ-5: Would the project conflict with or obstruct
implementation of a water quality control plan or sustainable groundwater management plan?
None required Less Than
Significant N/A
Section 4.11: Land Use and Planning
LUP-1: Would the project physically divide an established community?
None required No Impact N/A
LUP-2: Would the project cause a significant environmental impact due to a conflict with any land use plan, policy, or regulation adopted for the purpose of avoiding or mitigating an environmental effect?
None required Less Than
Significant N/A
Section 4.12: Mineral Resources
MIN-1: Would the project result in the loss of availability of a known mineral resource that would be a value to the region and the residents of the state?
None required Less Than
Significant N/A
MIN-2: Would the project result in the loss of availability of a locally important mineral resource recovery site delineated on a local general plan, specific plan or other land use plan? None required Less Than
Significant N/A
Section 4.13: Noise
NOI-1: Would the project result in generation of a substantial temporary or permanent increase in ambient noise levels in the vicinity of the project in excess of standards established in the local general plan or noise ordinance, or applicable standards of other agencies?
None required Less Than
Significant N/A
NOI-2: Would the project result in generation of excessive ground-borne vibration or ground-borne noise levels? None required Less Than Significant N/A NOI-3: For a project located within the vicinity of a private airstrip or an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, would the project expose people residing or working in the project area to excessive noise levels?
None required No Impact N/A
Section 4.14: Population and Housing
POP-1: Would the project induce substantial unplanned
population growth in an area, either directly (for example, by None required Less Than Significant N/A Riverview Marketplace Commercial Project
Environmental Impact Report Executive Summary
City of Bakersfield – SCH No. 2025101507 ES-22
Table ES-1: Summary of Impacts and Mitigation Measures
Threshold Project Design Features and Mitigation Measures Level of Significance
Level of
Significance
After Mitigation
proposing new homes and businesses) or indirectly (for
example, through extension of roads or other infrastructure)? POP-2: Would the project displace substantial numbers of existing people or housing, necessitating the construction of replacement housing elsewhere?
None required Less Than
Significant N/A
Section 4.15: Public Services and Recreation
PUB-1: Would the project result in substantial adverse
physical impacts associated with the provision of new or physically altered governmental facilities, need for new or physically altered governmental facilities, the construction of which could cause significant environmental impacts, in order to maintain acceptable service ratios, response times, or other performance objectives for fire protection?
None required Less Than
Significant N/A
PUB-2: Would the project result in substantial adverse
physical impacts associated with the provision of new or physically altered governmental facilities, need for new or physically altered governmental facilities, the construction of which could cause significant environmental impacts, in order to maintain acceptable service ratios, response times, or other performance objectives for police protection?
None required Less Than
Significant N/A
PUB-3: Would the project result in substantial adverse
physical impacts associated with the provision of new or physically altered governmental facilities, need for new or physically altered governmental facilities, the construction of which could cause significant environmental impacts, in order to maintain acceptable service ratios, response times, or other performance objectives for schools?
None required Less Than
Significant N/A
PUB-4: Would the project result in substantial adverse
physical impacts associated with the provision of new or physically altered governmental facilities, need for new or physically altered governmental facilities, the construction of which could cause significant environmental impacts, in order to maintain acceptable service ratios, response times, or other performance objectives for parks?
None required Less Than
Significant N/A
PUB-5: Would the project Result in substantial adverse
physical impacts associated with the provision of new or physically altered governmental facilities, need for new or physically altered governmental facilities, the construction of which could cause significant environmental impacts, in order None required Less Than
Significant N/A
Riverview Marketplace Commercial Project
Environmental Impact Report Executive Summary
City of Bakersfield – SCH No. 2025101507 ES-23
Table ES-1: Summary of Impacts and Mitigation Measures
Threshold Project Design Features and Mitigation Measures Level of Significance
Level of
Significance
After Mitigation
to maintain acceptable service ratios, response times, or other performance objectives for other services?
REC-1: Would the project increase the use of existing
neighborhood and regional parks or other recreational
facilities such that substantial physical deterioration of the facility would occur or be accelerated?
None required Less Than
Significant N/A
REC-2: Would the project include recreational facilities or require the construction or expansion of recreational facilities which might have an adverse physical effect on the
environment?
None required Less Than
Significant N/A
Section 4.16: Transportation
TRA-1: Would the project conflict with a program, plan, ordinance or policy addressing the circulation system,
including transit, roadway, bicycle and pedestrian facilities? None required Less Than
Significant N/A
TRA-2: Would the project conflict or be inconsistent with CEQA Guidelines § 15064.3, subdivision (b)?
No feasible mitigation is available. Potentially
Significant
Significant and
Unavoidable
TRA-3: Would the project substantially increase hazards due to a geometric design feature (e.g., sharp curves or
dangerous intersections) or incompatible uses (e.g., farm equipment)?
None required Less Than
Significant N/A
TRA-4: Would the project result in inadequate emergency access?
No mitigation required.
TRAF-PDF-1: Construction Traffic Management Plan.
The contractor would develop a detailed Construction Traffic Management Plan as part of the Project, including provision of construction worker parking in designated areas, temporary traffic controls during all construction activities adjacent to public rights-of-way, street closure information, detour plans, haul routes, and staging plans among other provisions. The contractor would submit the Construction Traffic Management Plan to the City of Bakersfield for approval. The Construction Management Plan would include the following:
• Scheduling workdays to begin and end prior to the morning and afternoon peak hours, respectively, to the extent
feasible so as to avoid worker trips during those peak
hours.
• Coordination with various City departments and offices to ensure adequate access to the Project Site and land uses in proximity of the Project Site is maintained.
Less Than
Significant N/A
Riverview Marketplace Commercial Project
Environmental Impact Report Executive Summary
City of Bakersfield – SCH No. 2025101507 ES-24
Table ES-1: Summary of Impacts and Mitigation Measures
Threshold Project Design Features and Mitigation Measures Level of Significance
Level of
Significance
After Mitigation
• Scheduling pick-ups, deliveries, and exports of construction materials so as to occur during off-peak hours. Hauling shall be from 9:00 A.M. to 3:00 P.M. weekdays, and 8:00 A.M. to 4:00 P.M. on Saturdays. No hauling shall be
performed on Sundays and holidays.
• Reduce the potential of trucks waiting for extended periods to load or unload.
• Provision of worker parking on-site or in designated off-site private parking areas and prohibition of construction-related vehicle parking on surrounding streets, other than the streets adjacent to the Project Site.
• Temporary traffic controls during all construction activities adjacent to public ROWs to improve traffic flow on public roadways (e.g., flag personnel) and to maintain access for land uses in the vicinity of the Project Site. Determine the number and location of flag personnel required during
traffic rerouting and deliveries.
• Contractor to post advance bilingual notification to adjacent property owners and occupants of upcoming construction
activities, including durations and daily hours of operation, at several locations on the Project Site.
• Establish requirements for storage of materials and
loading/unloading on the Project Site.
• Worksite traffic control plans approved by the City would be implemented to route vehicles, bicyclist and pedestrians around the area during any parking, travel lane or sidewalk closures and provide for protective measures for the public. • Identification of a construction manager and provision of a telephone number for any inquiries or complaints from
residents regarding construction activities. The telephone number shall be posted at the site readily visible to any interested party during site preparation, grading, and
construction.
Section 4.17: Tribal Cultural Resources
TCR-1: Would the project cause a substantial adverse
change in the significance of a tribal cultural resource, defined in Public Resources Code § 21074 as either a site, feature, place, cultural landscape that is geographically defined in terms of the size and scope of the landscape, MM CUL-1
MM CUL-2
Riverview Marketplace Commercial Project
Environmental Impact Report Executive Summary
City of Bakersfield – SCH No. 2025101507 ES-25
Table ES-1: Summary of Impacts and Mitigation Measures
Threshold Project Design Features and Mitigation Measures Level of Significance
Level of
Significance
After Mitigation
sacred place, or object with cultural value to a California Native American tribe, and that is listed or eligible for listing in the California Register of Historical Resources, or in a local register of historical resources as defined in Public
Resources Code section 5020.1(k)?
TCR-2: Would the project cause a substantial adverse
change in the significance of a tribal cultural resource, defined in Public Resources Code § 21074 as either a site, feature, place, cultural landscape that is geographically defined in terms of the size and scope of the landscape, sacred place, or object with cultural value to a California Native American tribe, and that is a resource determined by the lead agency, in its discretion and supported by
substantial evidence, to be significant pursuant to criteria set forth in subdivision (c) of Public Resources Code § 5024.1.
In applying the criteria set forth in subdivision (c) of Public Resource Code § 5024.1, the lead agency shall consider the significance of the resource to a California Native American tribe?
Section 4.18: Utilities and Service Systems
UTI-1: Would the project require or result in the relocation or construction of new or expanded water, wastewater
treatment, or stormwater drainage, electric power, natural gas, or telecommunications facilities, the construction or relocation of which could cause significant environmental effects?
None required Less Than
Significant N/A
UTI-2: Would the project have sufficient water supplies available to serve the project and reasonably foreseeable future development during normal, dry and multiple dry
years?
None required Less Than
Significant N/A
UTI-3: Would the project result in a determination by the wastewater treatment provider which services of may serve the project that is has adequate capacity to serve the
project’s projected demand in addition to the provider’s existing commitment?
None required Less Than
Significant N/A
UTI-4: Would the project generate solid waste in excess of State and local standards, or in excess of the capacity of local infrastructure?
None required Less Than
Significant N/A
Riverview Marketplace Commercial Project
Environmental Impact Report Executive Summary
City of Bakersfield – SCH No. 2025101507 ES-26
Table ES-1: Summary of Impacts and Mitigation Measures
Threshold Project Design Features and Mitigation Measures Level of Significance
Level of
Significance
After Mitigation
UTI-5: Would the project comply with federal, state, and local management and reduction statutes and regulations related to solid waste?
None required Less Than
Significant N/A
Section 4.19: Wildfire
WF-1: Would the project substantially impair an adopted emergency response plan or emergency evacuation plan?
None required No Impact N/A
WF-2: Would the project due to slope, prevailing winds, and other factors, exacerbate wildfire risks, and thereby expose project occupants to pollutant concentrations from a wildfire or the uncontrolled spread of a wildfire?
None required No Impact N/A
WF-3: Would the project require the installation or
maintenance of associated infrastructure (such as roads, fuel breaks, emergency water sources, power lines or other
utilities) that may exacerbate fire risk or that may result in temporary or ongoing impacts to the environment?
None required No Impact N/A
WF-4: Would the project expose people or structures to
significant risks, including downslope or downstream flooding or landslides, as a result of runoff, post-fire slope instability, or drainage changes?
None required No Impact N/A
City of Bakersfield – SCH No. 2025101507 1-1
1. Introduction
1.1 Overview of the Proposed Project
The Riverview Marketplace Commercial Project (Project) will involve the construction and operation of the Riverview Marketplace, a commercial retail center that would encompass approximately 405,531 square feet of total building space, located on an approximately 46.16- acre parcel (Project Site) in the City of Bakersfield (City), California. The Project Site is situated along the south side of Rosedale Highway, north of the railroad tracks, west of Coffee Road, and east of El Toro Viejo Road.
The specific businesses and/or tenants that would ultimately occupy each of the buildings are not fully known at this time. However, it is assumed that larger interior anchor buildings within the Project Site would be occupied by markets, retail uses, storage uses, and a health club. The outer building pads would be occupied by smaller retail tenants, a medical office, drive-thrus, fast casual and sit-down restaurants, a car wash, and a gas station with 20 dual-sided pumps. Other Project components include vehicular access and circulation improvements (both on- and off-site); surface parking areas and drive aisles; pedestrian access and circulation improvements; various landscape, hardscape, and lighting improvements; green space/park improvements; site and tenant signage; and infrastructure and utility improvements. A detailed project description is provided in Section 2, Project Description.
1.2 Purpose of the Environmental Impact Report (EIR)
The proposed Project is subject to the discretionary approval of the City of Bakersfield. In accordance with Sections 15050 and 15367 of the California Environmental Quality Act (CEQA) Guidelines, the City has prepared this draft environmental impact report (EIR) to evaluate the potential environmental impacts of the Project. Under Section 21067 of CEQA, the City is responsible for processing and approving the proposed Project. Accordingly, the City will consider the information in this EIR, along with other information that may be presented during the CEQA process. The EIR will also be used in connection with other permits and approvals necessary for the construction and operation of the Project.
In accordance with CEQA Guidelines Section 15121, this Draft EIR is an information document that will inform public agency decision-makers and the public generally of the environmental effects associated with the Project, and ways to minimize any significant environmental impacts through mitigation measures or reasonable alternatives to the Project. Should the EIR find that significant environmental impacts cannot be mitigated to a level considered less than significant, impacts are considered significant and unavoidable.
1.3 Environmental Review Process
In compliance with the CEQA Guidelines, the City has taken steps to provide opportunities for participation in the environmental review process. This includes undertaking a formal scoping process. The following sections describe the scoping process in greater detail.
Riverview Marketplace Commercial Project
Environmental Impact Report 1 Introduction
City of Bakersfield – SCH No. 2025101507 1-2
1.4 Scoping Process
As part of the preparation of the Draft EIR, an effort was made to contact State, regional, and local government agencies and interested parties to solicit comments and inform the public of the Project. This included the distribution of a Notice of Preparation (NOP) and a public scoping meeting.
1.4.1 Notice of Preparation
Pursuant to Section 15082 of the CEQA Guidelines, the City circulated an NOP of the Draft EIR to State, regional, and local agencies, and members of the public for a 32-day public review period. The public review period began Friday, October 31, 2025, and concluded Monday, December 1, 2025. The purpose of the NOP was to formally notice that the City was preparing a Draft EIR for the Project, and to solicit input regarding the scope and content of the environmental information to be included in the Draft EIR. Four written comment letters were received during the scoping period. A copy of the NOP and the written comment letters received by the City is provided in Appendix A, Notice of Preparation and Notice of Preparation Public Comments, of this Draft EIR.
1.4.2 Scoping Meeting
The City also held an EIR Scoping Meeting for the Project on Thursday, November 20, 2025. The purpose of the EIR Scoping Meeting was for the City to solicit input and written comments from agencies and the public on environmental issues or alternatives they believe should be addressed in the Draft EIR. A presentation explaining the Project was provided and potential attendees were given an opportunity to provide their comments on the scope of the Draft EIR. No members of the public attended the EIR Scoping Meeting, and no comments were received at the meeting. The presentation from the EIR Scoping Meeting is provided in Appendix A, Notice of Preparation and Notice of Preparation Public Comments.
1.5 Organization of the Draft EIR
Executive Summary. The Executive Summary provides an overview of the Draft EIR. It briefly describes the proposed Project (location and key Project features), the CEQA environmental review process, a summary of the Project impacts, a summary of the Project alternatives, and applicable mitigation measures.
Chapter 1. Introduction. This chapter provides a summary of the proposed Project, discusses the purpose of the EIR, including CEQA compliance requirements, and steps undertaken in the CEQA process, including the scoping process.
Chapter 2. Project Description. This chapter describes the proposed Project, including the Project location, surrounding land uses, existing conditions, Project objectives, Project use options, and the intended uses of the EIR.
Chapter 3. Environmental Setting. This chapter presents an overview of the Project’s environmental setting, including the regional setting, project site setting, and past, present, and probable future projects considered in the analysis of potential Project contributions to cumulative impacts.
Riverview Marketplace Commercial Project
Environmental Impact Report 1 Introduction
City of Bakersfield – SCH No. 2025101507 1-3
Chapter 4. Environmental Impact Analysis. This chapter describes the potential environmental effects of the proposed Project. The discussion is focused on potential impacts to 19 environmental resource topics. This includes discussion of the regulatory and environmental settings, methodology employed in the analysis, the thresholds of significance used to determine impacts, level of impact, mitigation measures, if warranted, and level of significance of the impact after mitigation. The Draft EIR addresses potential impacts to these environmental issues:
• Aesthetics
• Agriculture and Forestry Resources
• Air Quality
• Biological Resources
• Cultural Resources
• Energy
• Geology and Soils
• Greenhouse Gas Emissions
• Hazards and Hazardous Materials
• Hydrology and Water Quality
• Land Use and Planning
• Mineral Resources
• Noise
• Population and Housing
• Public Services and Recreation
• Transportation
• Tribal Cultural Resources
• Utilities and Service Systems
• Wildfire
Chapter 5. Alternatives. This chapter describes a reasonable range of alternatives to the proposed Project. These alternatives include Alternative 1: No Project Alternative Project, Alternative 2: Reduced Project Alternative, and Alternative 3: Existing General Plan/Zoning Alternative. Chapter 5 presents an analysis of the environmental effects of the alternatives for each issue area, though not to the same level of detail as analyzed for the proposed Project.
Chapter 6. Other CEQA Considerations. This chapter includes a discussion of other issues required by CEQA that are not discussed in other sections of the Draft EIR.
Chapter 7. Acronyms and Abbreviations. This chapter includes a list of the acronyms and abbreviations used throughout the Draft EIR.
Chapter 8. References. This chapter includes bibliography of resources used in preparation of the Draft EIR.
Chapter 9. List of Preparers. This chapter lists the persons responsible for preparation of the Draft EIR.
Appendices
The Environmental Analyses in this Draft EIR are supported by the following appendices:
Appendix A: Notice of Preparation and Notice of Preparation Comments Appendix A-1: Notice of Preparation and Notice of Preparation Presentation Appendix A-2: Notice of Preparation Comments
Appendix B: Air Quality, Greenhouse Gas Emissions, and Energy Technical Study Riverview Marketplace Commercial Project
Environmental Impact Report 1 Introduction
City of Bakersfield – SCH No. 2025101507 1-4
Appendix C: General Biological Assessment
Appendix D: Cultural Resources Assessment
Appendix E: Geotechnical Investigation
Appendix F: Hazards and Hazardous Materials Supporting Information Appendix F-1: Phase I ESA
Appendix F-2: Engineering Review of Plugged and Abandoned Oil and Gas Wellbores
Appendix G: Noise and Vibration Technical Study
Appendix H: Transportation Analysis and Vehicle Miles Traveled Analysis Appendix H-1: Transportation Analysis
Appendix H-2: Vehicle Miles Traveled Analysis
Appendix I: Utilities and Hydrology
Appendix I-1: Water Supply and Demand Analysis
Appendix I-2: Drainage Study
Appendix I-3: Sewer Area Study
Appendix J: Urban Decay Analysis Technical Memorandum
Appendix K: Tribal Correspondence
City of Bakersfield – SCH No. 2025101507 2-1
2. PROJECT DESCRIPTION
2.1 Environmental Setting
2.1.1 Project Location
The Project Site is located the northwestern portion of the City of Bakersfield (Figure 2-1, Regional Location Map). The Project Site is 46.16 acres and consists of one legal parcel (APN 368-010-05), which is an undeveloped L-shaped property situated along the south side of Rosedale Highway, north of the railroad tracks, west of Coffee Road, and east of El Toro Viejo Road.
2.1.2 Existing Conditions
Figure 2-2, Local Vicinity Map, provides an aerial photograph of the Project Site. Nearby uses include Rosedale Highway and a commercial retail center (Northwest Promenade), to the north; a Pacific Gas & Electric (PG&E) electric substation and vacant land to the south; El Toro Viejo Road, commercial retail, and a PG&E electric substation to the west; and Coffee Road, Friant-Kern Canal, and a commercial retail center to the east.
The Project Site is located on a portion of a larger property formerly occupied by the PG&E Kern Power Plant. The Project Site is currently secured on all sides by six-foot-tall chain-link fencing, with vehicular access provided via gated unpaved entry drives along Coffee Frontage Road and one concrete paved driveway along Rosedale Highway. Both Coffee Road and Rosedale Highway are improved with concrete curb and gutters, yet only Rosedale Highway is fully developed with a concrete sidewalk. A portion of Coffee Road is improved with a concrete sidewalk. Existing onsite features include abandoned oil wells, electrical transmission lines on metal poles, towers, and wooden poles, and several dirt roads and mounds.
The Golden Empire Transit (GET) District is the main transit agency servicing the City of Bakersfield. Currently, GET operates buses on the following three (3) routes within the vicinity of the Project: Route 61, Route 82, and Route 84. Nearby pedestrian facilities include sidewalks along both sides of Rosedale Highway, both sides of Coffee Road north of Jet Way, and the west side of Coffee Road south of Jet Way. Pedestrian crosswalks are provided at signalized intersections along Rosedale Highway and Coffee Road. Existing Class II Bike Lanes are provided in both directions along Rosedale Highway and Coffee Road.
Riverview Marketplace Commercial Project
Environmental Impact Report 2 Project Description
City of Bakersfield – SCH No. 2025101507 2-2
This page intentionally left blank.
Source: Google Maps, 2024
FIGURE 1: Regional Map
RIVERVIEW MARKET PROJECT
N.T.S
Califor California State nia State
University, Bakersfield
Kern River
Bakersfield
Municipal Airport
Project Site
Rosedale Hwy
SOURCE: Google Maps, 2024
FIGURE 2-1: Regional Location Map
RIVERVIEW MARKETPLACE COMMERCIAL PROJECT N.T.S.
Shafter
Smith Corner
99 178
RIO BRAVO
Rio Bravo 178
99 Tarina Calders Corner:
Hillcrest
18 East Niles
W 1
SUNSET
58 58
Kayandee 58 Edison
SEVEN OAKS 184:
Stevens VENOLA
CAMPUS PARK Rexland Acres Fuller Acres
58 43
119
Lamont
Di Giorgio El Adobe
Alameda Weedpatch Lakeside
Kimley»Horn
Pumpkin
Center
MYRICKS
CORNER
Bakersfield
OLEANDER/
East
Bakersfield
Edmundson
Acres
T _
(204
CITY IN
THE HILLS
Rosedale
GREENACRES
Riverview Marketplace Commercial Project
Environmental Impact Report 2 Project Description
City of Bakersfield – SCH No. 2025101507 2-4
This page intentionally left blank.
FIGURE 2: Aerial Map
RIVERVIEW MARKET PROJECT
N.T.S
Source: Google Earth Pro, 2024
Project Site RESIDENTIAL COMMERCIAL COMMERCIAL
COMMERCIAL The Promenade
COMMERCIAL
INDUSTRIAL
Coffee Rd
Coffee Rd
Patton Wy
Rosedale Hwy Rosedale Hwy
Langley Rd
Ribston Ave
Wolf River Ave
Bolero Ave
Pink Lady Wy
Mcintosh
Wy
Cirspin St
Granite Falls Dr
Downing Ave
Clay PAtrick Farr Wy El Toro Viejo Rd
SOURCE: Google Earth Pro, 2024
FIGURE 2-2: Local Vicinity Map
RIVERVIEW MARKETPLACE COMMERCIAL PROJECT N.T.S.
AY T 7— ou ' - T— —-
— 8 TOPA —
)
I "F“s, lo • /sii u A 1 '■ -i ‘egg
- t ; 4. as
(112 hr f 55 -
8. 2. 3wd R) Ti $ N " E “ • $m Oetm —1 B
5 117 aee. 4
V het* J d‘ f oe Enou.u 5 —= ' 4 n h A | % k-j taine hmt T,, — 1 C
4 res | 7 7m TTs f. • • i.... E rsten - Si D5a I’mns ky 2 f k wuat .SUH 1
J
1 ws "3" J Ereel 1 242 U M k. Ei -t 1 1
-
"tE
!
DIE. - ■ (
4 d an7:
t “us
“me
4 8. a wens S i
3w 1.9
( 452 ; 7 *
t
bii J 3 ’
I 7
E" % 98 n /
Th -
f • wit* 5 3 “1
LEs an4r21
* 2—
thee e.r "a g. I i -
l.. me -fe $ T,
sat 44 r L s
olnts t HreFt
MI allhla’s r
-
1 y t edg / hal 1 -*4,
" I e d. = / aesont it =
1 io “no t — 4 $
1 i
fit t
ft mn- 11- t a E res || - - L e
-
- - __La__ I 2 a. £ IO,
_ laf 4
_ n
KimleyHorn
(hire ms’", 4
Inas *
A-ABr,
g’l
"5
fE
5* V
_
।
।
. s va ,
312
1 5===
[I
cel in"
v he 62
I--- n» r F
t"Lhs
.7
3240 aasi
Lae
B 4 *-n5*3 lem
s w “eeee meant
2lsae 13/0391 ■I l; no Tin . IXj
tst 3
fl oy.
ooregi 1” I ha
1 T a
6 tin Fat -7
r-us -5
r.
eki
s.A
fa A as
Thy, -• L mgs
—*.2
V
>
(ape 2 ' w 00hmd
r
-0 If ats
Aot t "ice
prryopes so
Gw-222d
fp
ot
12 lj
IM
BAilir
‘shertyn ’ ET
-- teL “h wil —
4 : $
—
wr..."
■1
fa
g “hhr-.
/ —Ure piling
l Sgi(ss
Th A : W
"hed,l .
7 mit ri
536s tali R‘"4h4 J CTPN
u®
5g tx
—
|'
V
TW"PHP
Ss
Riverview Marketplace Commercial Project
Environmental Impact Report 2 Project Description
City of Bakersfield – SCH No. 2025101507 2-6
This page intentionally left blank.
Riverview Marketplace Commercial Project
Environmental Impact Report 2 Project Description
City of Bakersfield – SCH No. 2025101507 2-7
2.1.3 General Plan and Zoning
The planning and regulatory plans that govern development and use of the Project Site are the Metropolitan Bakersfield General Plan (updated January 20, 2016, per Resolutions No. 018-16 and 019-16) and the Bakersfield Municipal Code – Title 17 (Zoning Ordinance). The General Plan land use designation of the Project Site is P (Public Facilities). The Project Site is zoned M-2 (General Manufacturing). The Project applicant is seeking an amendment to the City’s General Plan, changing the Project Site’s designation from P (Public Facilities) to LI (Light Industrial), to facilitate the Project Site’s proposed use and create alignment with the Project Site’s M-2 zoning designation, which under the City’s stacked zoning code allows, by right, all uses are permitted under the commercial designations. Therefore, to proceed with the Project and its proposed uses and to provide consistency with the Project site’s M-2 zoning designation, the LI designation has been determined to be the appropriate land use designation.
2.2 Description of Project
2.2.1 Project Overview
The Project involves construction and operation of the Riverview Marketplace, a commercial retail center that would encompass 405,531 square feet of total building space, as shown in Table 2-1, Proposed Uses.
The specific businesses and/or tenants that would ultimately occupy each of the buildings are not fully known at this time. However, it is assumed that larger interior anchor buildings within the Project Site would be occupied by markets, retail uses, storage uses, and a health club. The outer building pads would be occupied by smaller retail tenants, a medical office, drive-thrus, fast casual and sit-down restaurants, a car wash, and a gas station with 20 dual-sided pumps.
Table 2-1: Proposed Uses
Project Site Uses Square Feet/Unit
Retail (single and multi-tenant) 268,082
Restaurant (sit down and fast casual) 31,796
Restaurants (drive-thru) 16,495
Car Wash 4,100
Health Club 24,993
Medical Office 8,996
Bank 9,120
Public Storage 40,000
Gas Filling Station 20 dual-sided fuel pumps
Electrical and fire riser rooms 1,949
TOTAL 405,531 SF
New Landscaping Provided 325,120
sf = square feet
Riverview Marketplace Commercial Project
Environmental Impact Report 2 Project Description
City of Bakersfield – SCH No. 2025101507 2-8
These uses are permitted uses pursuant to the provisions of Chapter 17.30 (M-2 General Manufacturing Zone), Section 17.30.020 (Permitted Uses) of the Bakersfield Zoning Ordinance.
Figure 2-3, Conceptual Site Plan illustrates the layout and location of uses for the Project.
Other Project components, which are described in more detail below, include vehicular access and circulation improvements (both on- and off-site); surface parking areas and drive aisles; pedestrian access and circulation improvements; various landscape, hardscape, and lighting improvements; green space/park improvements; site and tenant signage; and infrastructure and utility improvements. Project development is anticipated to be completed in two development phases, as illustrated in Figure 2-4, Site Plan Phasing.
N.T.S.
FIGURE 2-3: Conceptual Site Plan
RIVERVIEW MARKETPLACE COMMERCIAL PROJECT
T
T
T T T
T
T
S
S S
S
S
S S S S
4 YD 4 YD 4 YD 4 YD 4 YD
V
141'-0"
33'-6"
19 CAR VACUUM STALLS
PROPOSED LEFT
TURN POCKET
EXISTING TRAFFIC
SIGNAL
20 18
PROPOSED
TRAFFIC SIGNAL
19 20
PARKING
SURPLUS A
31 11
14 TWR
TWR
TWR
TS
8 cw
5 6
27 23
16 19
92'-4"
1 12
10 2
C2 C1 C3
C4
A1
D1
C7
C9
C8
MULTI-USE PATH
10' WIDE
MULTI-USE PATH
10' WIDE
MULTI-USE PATH
10' WIDE
10'-0"
SETBACK
PROPERTY LINE
PG&E SETBACK
PROPERTY LINE
10'-0"
SETBACK
EXISTING TRAFFIC
SIGNAL
G1
22 A2
18 18
6 8
23 23
23 23
15 39
42 ROSEDALE HIGHWAY
OPEN GREEN SPACE
10' SETBACK
10' WIDE
MULTI-USE PATH
PG&E SETBACK
SETBACK
PG&E
25'-0"
49'-0"
30'-0" 22'-0" 25'-0" TYP.
25'-0"
25'-0"
55'-11"
30'-0"
25'-0"
124'-3"
26'-10"
245'-2"
30'-0"
30'-0"
30'-0" 25'-0"
TYP.
25'-0"
TYP.
25'-0"
TYP.
25'-0"
TYP. 31'-0"
44'-1"
38'-6"
35'-5"
30'-0"
213'-0" 45'-0"
4 YD 4 YD
PAD 3
DT RESTAURANT
760 SF
NON-SPRINKLERED
PAD 4
DT RESTAURANT
4,277 SF
NON-SPRINKLERED
PAD 5
DT/FAST CASUAL
RESTAURANT
6,698 SF
SPRINKLERED
PAD 8
RETAIL
4,694 SF
SPRINKLERED
PAD 9
REST.
7,967 SF
SPRINKLERED
PAD 10
DT/FAST
CASUAL REST./
RETAIL
10,110 SF
SPRINKLERED
PAD 11
DT REST/RETAIL.
11,719 SF
SPRINKLERED
PAD 12
MED. OFFICE
9,129 SF
SPRINKLERED
PAD 13
RESTAURANT
6,533 SF
SPRINKLERED
PAD 14
REST/RETAIL
7,135 SF
SPRINKLERED
4 YD 4 YD
19 18
cw
14 PLAZA
10 176'-0"
61'-11"
25'-0"
4 YD 4 YD 4 YD
14 141'-4"
238'-0"
SHOPS 2
RETAIL/FAST
CASUAL REST.
10,858 SF
SPRINKLERED
MAJOR B
MARKET
34,971 SF
SPRINKLERED
MAJOR A
HEALTH CLUB
24,993 SF
SPRINKLERED
DRIVE-THRU
RESTAURANT
±2,740 S.F.
25'-0"
30'-0" 30'-0"
26 12
26 1
25'-0"
45'-0"
30'-0"
C5
C8
DRIVER CARTS
PICK-UP PICK-UP PICK-UP PICK-UP PICK-UP PICK-UP PICK-UP PICK-UP
CARTS CARTS
CARTS CARTS
18 43
7 18
18 23
45 24 8
35'-11"
COFFEE ROAD
30'-0"
60'-0"
167'-8"
44'-6" 96'-2"
36'-0" 25'-0"
30'-0"
9 9
25'-0"
12 6
C5 C6
22 25'-0"
25'-0"
TYP.
10 5 10 10 54'-0"
SUITE A
RETAIL
±3,028 S.F. 4 YD 4 YD65'-11"
138'-6"
6 13
23 1
7 7
3 7 7
13 7
12 8 14
1 1 2
7 20
21 11
24 18
PG&E SETBACK
PAD 6
DT RESTAURANT
2,578 SF
NON-SPRINKLERED 34'-6"
13 5
12 C5 4 YD 4 YD STORAGE BLDG (±500 UNITS) ±40,000 SF SPRINKLERED
FUEL CANOPY
20 DUAL SIDED
DISPENSERS
PAD 2
CAR WASH
4,100 SF
PAD 1
DT /FAST CASUAL
RESTAURANT
8,224 SF
SPRINKLERED
12 3
15 19
30'-0"
DT.
REST
±1,720 S.F.
127'-9"
64'-0"
18'-0"
10'-0"
18'-0"
14 4
30'-0"
4 15'-5" 30'-0"
25'-0" 18'-0"
25 14
25'-0"
1 1
1 SUITE A
RETAIL
±2,482 S.F.
SUITE B
RETAIL
±2,496 S.F.
RETAIL
±3,498 S.F.
RETAIL
±2,646 S.F.
RETAIL
±2,659 S.F.
SUITE B
REST.
±1,844 S.F.
SUITE C
RETAIL
±1,520 S.F.
SUITE D
REST.
±1,794 S.F.
SUITE A
RETAIL
±3,042 S.F.
SUITE D
FAST CASUAL REST.
±1,762 S.F.
SUITE B
RETAIL
±2,023 S.F.
SUITE C
RETAIL
±2,081 S.F.
SUITE E
RETAIL
±1,950 S.F. 4 YD 4 YD 7'-6"
7 14
10 1
16 9
30'-0"
12'-0" 4 YD 4 YD 4 YD 4 YD
5 6
8 8'-0"4 YD 4 YD
4 YD 4 YD
7 10 10
55'-0"
12'-0"
124'-3"
7 10 10
PATIO
TRASH
STOP
STOP LANE 1 LANE 2
DO NOT ENTER
5 9
5 25'-0"
25'-0"
250 SF
25'-0"
510 SF
DRIVE-THRU
RESTAURANT
±2,500 S.F.
DRIVE-THRU
RESTAURANT
±2,296 S.F.
FAST CASUAL
RESTAURANTS
±4,226 S.F.
SHOPS 1
RETAIL
4,979 SF
SPRINKLERED
R10'-0" R20'-0"
27 12
5 REST
±2,400 S.F.
RETAIL
±2,400 S.F.
RETAIL
±2,201 S.F.
16 7
80'-0"
73'-11"
60'-0"
118'-11" PATIO
6 25'-0"
25'-0"
25'-0"
PAD 7
RETAIL
4,694 SF
SPRINKLERED
86'-11" 86'-11"
142'-0"
16 7
13 11
40'-0" 20'-0"
24'-0"
TYP.
9'-0"
18'-0"
8'-0"
8'-11"
30'-0"
Ø110'-0"
30'-0"
36'-0"
25'-0"
TYP.
14 7
5 10
4 12
6 7
23 6
9 62'-0"
ON-GRADE LOADING
4 YD 4 YD 4 YD
8'-0"
PATIO
7'-6" 12'-0"
MENU BOARD
1 1
16'-0"
20'-0"
61'-0"
66'-4"
61'-0"
26'-0"
27'-0"
29'-10" 100'-0"
100'-0"
100'-0"
208'-0"
MAJOR C
10,000 SF
SPRINKLERED
MAJOR D
RETAIL
10,000 SF
SPRINKLERED
MAJOR I
RETAIL
25,013 SF
SPRINKLERED
MAJOR G
RETAIL
15,562 SF
SPRINKLERED
MAJOR H
RETAIL
19,221SF
SPRINKLERED
100'-0"
MAJOR E
RETAIL
25,047 SF
SPRINKLERED
234'-0"
187'-4"
110'-0" 116'-8" 100'-0" 110'-6"
136'-8"
156'-0"
MAJOR J
14,176 SF
SPRINKLERED
201'-4"
102'-0"
MAJOR F
RETAIL
18,012 SF
SPRINKLERED
100'-0"
196'-0"
176'-0"
253'-4"
134'-8"
16'-0" 30'-0"
4 YD 4 YD 4 YD
4 YD
4 YD 4 YD
18 18
11 4 YD 4 YD 4 YD
4 YD 4 YD 4 YD
48'-10"
12'-0"
12'-0"
2 CONTROLLER
OFFICE
308 SF
CONTROLLER
/STORAGE
120 SF
76'-11"
92'-4"
14 PLAZA
14 SHOPS 2
RETAIL/FAST
CASUAL REST.
10,858 SF
30'-0" 30'-0"
SUITE A
RETAIL
±3,042 S.F.
SUITE D
FAST CASUAL REST.
±1,762 S.F.
SUITE B
RETAIL
±2,023 S.F.
SUITE C
RETAIL
±2,081 S.F.
SUITE E
RETAIL
±1,950 S.F.
7 5
10 16'-0"
20'-0"
61'-0"
66'-4"
61'-0"
100'-0" 100'-0"
MAJOR I
RETAIL
25,013 SF
100'-0"
MAJOR E
RETAIL
25,047 SF
234'-0"
213'-4"
110'-0" 116'-8" 100'-0"
110'-0"
168'-3"
156'-0"
MAJOR J
14,176 SF
201'-4"
102'-0"
100'-0"
196'-0"
176'-0"
253'-3"
132'-8"
16'-0"
4 YD 4 YD 4 YD 4 YD
4 YD
4 YD
4 YD 4 YD 4 YD
48'-10"
30'-0"
30'-0"
30'-0"
222'-0"
ON-GRADE LOADING 4 YD 4 YD 4 YD
GROCERY TENANT AREA LIMIT
GROCERY TENANT AREA LIMIT
MAJOR C
10,000 SF
MAJOR D
RETAIL
10,000 SF
MAJOR G
RETAIL
15,562 SF
MAJOR H
RETAIL
19,221SF
MAJOR F
RETAIL
18,012 SF
FUTURE
EXPANSION
11,927 SF
TOTAL AREA:
21,927 SF
FUTURE
EXPANSION
12,927 SF
TOTAL AREA:
22,927 SF
TOTAL AREA:
25,329 SF
TOTAL AREA:
26,326 SF
TOTAL AREA:
23,927 SF
FUTURE
EXPANSION
7,317 SF
FUTURE
EXPANSION
10,764 SF
FUTURE
EXPANSION
4,706 SF
FUTURE
EXPANSION
10,260 SF
TOTAL AREA:
24,436 SF
30'-0"
FUTURE
EXPANSION
2,908 SF
FUTURE
EXPANSION
2,816 SF
30'-0" 4 YD 4 YD
FAST CASUAL
RESTAURANTS
2,861 S.F.
FAST CASUAL
RESTAURANTS
2,687 S.F.
6 8
PRELIMINARY
RETENTION BASIN
3 5
1 4
4 4 7
6 50
16 21'-3"
68'-0" 30'-0" 15' LANDSCAPE SETBACK
25'-0" 12'-0"
22'-0" 34'-0"
14'-11"
34'-0" 34'-0" 34'-0" 20'-0"
30'-0" 30'-0"
30'-0"
50 50
21 5
30'-0" 36'-0" 25'-0" 36'-0" 25'-0" 36'-0" 30'-0"
25'-0"
30'-0"
30'-0"
186'-9"
63'-0"
KEEP
CLEAR
8'-0" 51'-0"
21'-0"
5 25'-0"
9'-5"
16 10
25'-0" 25'-0"
15'-0"
15'-0"
25'-0" 4 YD 4 YD 12'-0"
15' LANDSCAPE SETBACK
24'-0"
12'-0" 18'-0"
25'-0" 41'-5"
25'-0"
12'-0" 12'-0"
N
0 SITE PLAN
SP-31
Scale : 1" = 80'
40' 80' 160'
N
LOCATION PLAN
NOTE: This information is conceptual in nature and is subject to adjustments pending further verification and Client, Tenant, and Governmental Agency approvals. No warranties or guaranties of any kind are given or implied by the Architect.
DATE:
MCG JOB #:
DATE REVISIONS
SWC ROSEDALE AND COFFEE
24.457.01 BAKERSFIELD, CA
C MCG ARCHITECTURE 2025 ALL RIGHTS RESERVED
AREA RESERVED FOR
CITY STAMP
A-1.0
GENERAL NOTES:
- Buildings or structures shall require installation of an automatic fire sprinkler system where required by current California Building Code and City ordinance.
- The developer shall include fire resistive wall construction details with the final building plans for all exterior walls of any building that is within the distance as set forth in Table 602 of the California Building Code. - Prior to issuing a building permit, the Building Division will calculate and collect the appropriate school district impact fees.
- Prior to granting occupancy, the Building Division will verify that a water meter serving the development is in place. The developer shall contact the applicable water purveyor to inquire about their process for obtaining water service for the development as soon as possible (for water purveyor agency information contact: 1000 Buena Vista Road; 661-326-3715). - All fire lanes. Any modifications shall be approved by the Fire Department.
Fire lane identification signs shall be installed every 100 feet with red curbing when curbing is required. All work shall be completed before occupancy of any building or portion of any building is allowed. b. All fire hydrants, both offsite (nearest to site) and on-site. Include flow data on all hydrants.
Hydrants shall be in good working condition and are subject to testing for verification. Fire flow requirements must be met prior to construction commencing on the project site. Please provide two (2) sets of the water plans stamped by a licensed Registered Civil Engineer to the Fire Department and two (2) sets to the Water Resources Department (1000 Buena Vista Road, Bakersfield, CA. 93311; 661-326-3715). (Note: Show: 1) distance to the nearest hydrant; and 2) distance from that hydrant to the farthest point of the project site.) c. All fire sprinkler and/or stand pipe systems, fire alarms and commercial hood systems. These suppression systems require review and permits by the Fire Department. The Fire Department will issue guidelines for these various items as they may apply to this project. d. Project address, including suite number if applicable. If the project is within a shopping or business center, note the name and address of the center. e.
Name and phone number of the appropriate contact person.
N.T.S.
07.01.2025 A-1.0
FUTURE EXPANSION
SOURCE: McG Architecture, 2025
=
—I
atte) —
Iy
= A
t
X G
J I’ll III11II II..'111I II II Tim ♦
P IIIIT —
—n I in m IIIIIE =
55 E.......... ftiiiiiiiiiiliriiiiiaiiii TOTTI
_ EullulIId*
j
/ mlTt=Tf ===== T
I HHHHHHH5 smzr (HHHHHHH. 101a
|
IUMID All
-taidd oiiiiiiiiiiiiiiiiiiiiii: 10CHlIIIIITUepag
we 1 L sotmme __C___ * $p 1
i s 8
IE LL [
Equuo
-* 111111. ‘: 1—6 74 i
I
1111111111 la I
I
1 try H
i
।
7 I —CHE
yC i U.Oi [ HTHTH )G C T
1 /OH ,1
JC.THHTT
1 - — iiiiiiiiiiii iinyiiiiiO tL
iiiiiiimiii
1 J11 HR 11111 u QLL Le
Kimley»Horn
(
■■ I
I
I
777
//
i
i
i
i
|
i
—J
HHHHH WJ.TTTITTITTIT
1 S
IIIELIIIIIIIE
ZHuE
i
i
i ;
4 I
I
I
I
S
——
L
—
/
i.L.
|
11 *
iL
(Te
Riverview Marketplace Commercial Project
Environmental Impact Report 2 Project Description
City of Bakersfield – SCH No. 2025101507 2-10
This page intentionally left blank.
N.T.S.
FIGURE 2-4: Site Plan Phasing
RIVERVIEW MARKETPLACE COMMERCIAL PROJECT 4 YD 4 YD
V
141'-0"
33'-6"
19 CAR VACUUM STALLS
PROPOSED LEFT
TURN POCKET
EXISTING TRAFFIC
SIGNAL
20 18
PROPOSED
TRAFFIC SIGNAL
19 20
PARKING
SURPLUS A
31 11
14 TWR
TWR
TWR
TS
8 cw
5 6
27 23
16 19
61'-0"
1 12
11 2
C2 C1 C3
C4
A1
D1
C7
C9
C8
MULTI-USE PATH
10' WIDE
MULTI-USE PATH
10' WIDE
MULTI-USE PATH
10' WIDE
10'-0"
SETBACK
PROPERTY LINE
PG&E SETBACK
PROPERTY LINE
10'-0"
SETBACK
EXISTING TRAFFIC
SIGNAL
G1
22 A2
18 18
6 8
23 23
23 23
15 39
42 ROSEDALE HIGHWAY
OPEN GREEN SPACE
10' SETBACK
10' WIDE
MULTI-USE PATH
PG&E SETBACK
SETBACK
PG&E
25'-0"
49'-0"
30'-0" 22'-0" 25'-0" TYP.
25'-0"
25'-0"
55'-11"
30'-0"
25'-0"
124'-3"
26'-10"
245'-2"
30'-0"
30'-0"
30'-0" 25'-0"
TYP.
25'-0"
TYP.
25'-0"
TYP.
25'-0"
TYP. 31'-0"
44'-1"
38'-6"
35'-5"
30'-0"
213'-0" 45'-0"
4 YD 4 YD
PAD 3
DT RESTAURANT
760 SF
NON-SPRINKLERED
PAD 4
DT RESTAURANT
4,277 SF
NON-SPRINKLERED
PAD 5
DT/FAST CASUAL
RESTAURANT
6,698 SF
SPRINKLERED
PAD 8
RETAIL
4,694 SF
SPRINKLERED
PAD 9
REST.
7,967 SF
SPRINKLERED
PAD 10
DT/FAST
CASUAL REST./
RETAIL
10,110 SF
SPRINKLERED
PAD 11
DT REST/RETAIL.
11,719 SF
SPRINKLERED
PAD 12
MED. OFFICE
9,129 SF
SPRINKLERED
PAD 13
RESTAURANT
6,533 SF
SPRINKLERED
PAD 14
REST/RETAIL
7,135 SF
SPRINKLERED
4 YD
4 YD
19 18
cw
14 PLAZA
11 176'-0"
61'-11"
25'-0"
4 YD 4 YD 4 YD
14 141'-4"
238'-0"
SHOPS 2
RETAIL/FAST
CASUAL REST.
10,858 SF
SPRINKLERED
MAJOR B
MARKET
35,098 SF
SPRINKLERED
MAJOR A
HEALTH CLUB
24,993 SF
SPRINKLERED
DRIVE-THRU
RESTAURANT
±2,740 S.F.
25'-0"
30'-0" 30'-0"
26 12
26 1
25'-0"
45'-0"
30'-0"
C5
C8
DRIVER CARTS
PICK-UP PICK-UP PICK-UP PICK-UP PICK-UP PICK-UP PICK-UP PICK-UP
CARTS CARTS
CARTS
18 43
7 18
18 23
46 25 8
35'-11"
COFFEE ROAD
30'-0"
60'-0"
167'-8"
44'-6" 96'-2"
36'-0" 25'-0"
30'-0"
9 9
25'-0"
12 6
C5 C6
22 25'-0"
25'-0"
TYP.
10 5 10 10 54'-0"
SUITE A
RETAIL
±3,028 S.F. 4 YD 4 YD65'-11"
138'-6"
6 13
23 1
7 7
3 7 7
13 7
12 8 14
1 1 2
7 21
21 12
23 18
PG&E SETBACK
PAD 6
DT RESTAURANT
2,578 SF
NON-SPRINKLERED 34'-6"
13 5
12 C5 4 YD 4 YD STORAGE BLDG (±500 UNITS) ±40,000 SF SPRINKLERED
FUEL CANOPY
20 DUAL SIDED
DISPENSERS
PAD 2
CAR WASH
4,100 SF
PAD 1
DT /FAST CASUAL
RESTAURANT
8,224 SF
SPRINKLERED
12 3
15 19
30'-0"
DT.
REST
±1,720 S.F.
127'-9"
64'-0"
18'-0"
10'-0"
18'-0"
14 4
30'-0"
4 15'-5" 30'-0"
25'-0" 18'-0"
25 14
25'-0"
1 1
1 SUITE A
RETAIL
±2,482 S.F.
SUITE B
RETAIL
±2,496 S.F.
RETAIL
±3,498 S.F.
RETAIL
±2,646 S.F.
RETAIL
±2,659 S.F.
SUITE B
REST.
±1,844 S.F.
SUITE C
RETAIL
±1,520 S.F.
SUITE D
REST.
±1,794 S.F.
SUITE A
RETAIL
±3,042 S.F.
SUITE D
FAST CASUAL REST.
±1,762 S.F.
SUITE B
RETAIL
±2,023 S.F.
SUITE C
RETAIL
±2,081 S.F.
SUITE E
RETAIL
±1,950 S.F. 4 YD 4 YD 7'-6"
7 14
10 1
16 9
30'-0"
12'-0" 4 YD 4 YD 4 YD 4 YD
5 6
8 8'-0"4 YD 4 YD
4 YD 4 YD
7 10 10
55'-0"
12'-0"
124'-3"
7 10 10
PATIO
TRASH
STOP
STOP LANE 1 LANE 2
DO NOT ENTER
5 9
5 25'-0"
25'-0"
250 SF
25'-0"
510 SF
DRIVE-THRU
RESTAURANT
±2,500 S.F.
DRIVE-THRU
RESTAURANT
±2,296 S.F.
FAST CASUAL
RESTAURANTS
±4,226 S.F.
SHOPS 1
RETAIL
4,979 SF
SPRINKLERED
R10'-0" R20'-0"
27 12
5 REST
±2,400 S.F.
RETAIL
±2,400 S.F.
RETAIL
±2,201 S.F.
16 7
80'-0"
73'-11"
60'-0"
118'-11" PATIO
6 25'-0"
25'-0"
25'-0"
PAD 7
RETAIL
4,694 SF
SPRINKLERED
86'-11" 86'-11"
142'-0"
7 40'-0" 20'-0"
24'-0"
TYP.
9'-0"
18'-0"
8'-0"
8'-11"
30'-0"
30'-0"
36'-0"
25'-0"
TYP.
14 4
5 10
12 4
5 23
6 9
62'-0"
8'-0"
PATIO
7'-6" 12'-0"
MENU BOARD
1 1
16'-0"
20'-0"
61'-0"
61'-0"
61'-0"
26'-0"
27'-0"
29'-10"
16'-0" 30'-0"
18 18
11 4 YD 4 YD 4 YD 12'-0"
12'-0"
2 CONTROLLER
OFFICE
308 SF
CONTROLLER
/STORAGE
120 SF
76'-11"
GROCERY TENANT AREA LIMIT
30'-0"
30'-0" 4 YD 4 YD
FAST CASUAL
RESTAURANTS
2,861 S.F.
FAST CASUAL
RESTAURANTS
2,687 S.F.
6 8
PRELIMINARY
RETENTION BASIN
3 5
1 4
4 4 7
6 32
16 21'-3"
68'-0" 30'-0" 15' LANDSCAPE SETBACK
25'-0" 12'-0"
22'-0" 34'-0"
14'-11"
34'-0" 34'-0" 34'-0" 20'-0"
30'-0" 30'-0"
21 5
30'-0" 36'-0" 25'-0" 36'-0" 25'-0" 36'-0" 30'-0"
25'-0"
30'-0"
30'-0"
186'-9"
63'-0"
KEEP
CLEAR
8'-0" 51'-0"
21'-0"
5 25'-0"
9'-5"
16 10
25'-0" 25'-0"
15'-0"
15'-0"
25'-0" 4 YD 4 YD 12'-0"
15' LANDSCAPE SETBACK
24'-0"
12'-0" 18'-0"
25'-0" 41'-5"
25'-0"
12'-0" 12'-0"
CARTS
32 31
19 32
25'-0" 36'-0" 30'-0"WB-67 - Interstate Semi-Trailer
3 19
5 3
3 100'-0" 100'-0"
MAJOR I
RETAIL
27,921 SF
MAJOR E
RETAIL
27,863 SF
239'-4"
239'-4"
110'-0" 116'-8" 100'-0"
110'-0"
239'-4"
239'-4"
MAJOR J
24,436 SF
102'-0"
100'-0"
253'-3"
253'-3"
239'-4"
253'-4"
MAJOR D
RETAIL
22,927 SF
MAJOR G
RETAIL
26,326 SF
MAJOR H
RETAIL
23,927SF
MAJOR F
RETAIL
25,329 SF
MAJOR C
RETAIL
21,927 SF
N
0 PHASING PLAN
SP-33
Scale : 1" = 80'
40' 80' 160'
N
LOCATION PLAN
N.T.S.
07.01.2026 A-1.1
NOTE: This information is conceptual in nature and is subject to adjustments pending further verification and Client, Tenant, and Governmental Agency approvals. No warranties or guaranties of any kind are given or implied by the Architect.
DATE:
MCG JOB #:
DATE REVISIONS
SWC ROSEDALE AND COFFEE
24.457.01 BAKERSFIELD, CA
C MCG ARCHITECTURE 2026 ALL RIGHTS RESERVED
AREA RESERVED FOR
CITY STAMP
N.T.S.
RIVERVIEW MARKETPLACE
SITE PLAN GENERAL NOTES:
- REFER TO CIVIL DRAWINGS FOR ALL EASEMENT INFORMATION. - REFER TO CIVIL DRAWINGS FOR WELL INFORMATION.
W A
SOURCE: McG Architecture, 2026
i
T
■
fl
T
t
HL .
11111111 mupLij-l!l
AIIIIIIL CTmIIIIIIIIIT0
IIL
- I -1 - —x
2i IIIIIIIIIIIIIIIIIIIIIIL 1l 1 QL
HHHTHH
1A E ।; Ul. 11111 1 111I11 nrU
5+0.. h... .
C.J. 11111 u 111 i HIH #
T
/
in । HI । m । m । HI । n | —0111071101 1
i:
I
i
i
II
I
X |
LLLLLLLLLLLLLL
111111111111111111111 g
0 SJ
n/1
n|H111111H11111111 ii i n
Li.i.11111111 in 11 ii । i । i U
L IntTTttTTttllWttTTttlJ
3 £
TTTTTTTTTTTTTTTJTTTATTTTTTn,
TTTTITTTTIITITTITII
XlXlllXlllXlllXl.il 11.
5 _ 0
UEtlTTtpeage= (HHHHHHH J .
SH/E
(IIDr
7 IZ
IE
1 =
IE
UHHHHHHHE
M
ft =
—
X
T
11 —
CD
Site Summary
TOTAL SITE AREA
PARKING REQUIRED
AREA(SF)
TOTAL GROSS FLOOR AREA
TOTAL GROSS FLOOR AREA
TOTAL GROSS FLOOR FOOTPRINT AREA
LAND TO BUILDING RATIO
BUILDING COVERAGE
APN: 368-010-05
ZONING USE: (M-2) GENERAL MANUFACTURING
LAND USE DESIGNATION: (LI-1) LIGHT INDUSTRIAL
REQUIRED SETBACKS:
Rear: n/a
BLba. HEiGHT: 90 RL Max.
PARKING DIMENSIONS: 9 Ft x 18 Ft
DRIVE AISLE WIDTH: 25 Ft
FIRELANE ACCESS WIDTH: 20 Ft Min.
LANDSCAPE SETBACK: 10 Ft Min.
TREE PLANTING: 1TREE PER 6 PARKING SPACES
Restaurant (Sit Down and Fast Casual)
carwasn
Health Club
Medical Office
Public Storage
2,057 Stalls
2,081 Stalls
5.13 /1,000Sf
2,010,574 Sf
405,531 St
PARKING PROVIDED______________
PROPOSED PARKING STALLS
PICK-UP WINDOW CREDIT
OVERALL PROPOSED PARKING STALLS:
PROPOSED PARKING RATIO:
Retail- Single Tenant
/Bank/Fitness/Office
Retail- Multi Tenant/Shops
Restaurants / D/T
Medical Clinic
Carwash
Public Storage
iuhmoy 11 f tai
II i: rrliiiiiir
7 ..... ..... IIIL
x
1 I
i
I
i
bTiiiTIiTiTU i
-
.. 1
II I
I
I
I
I
OO
I
I
I
I
I
LEGEND
PHASE 1 I
PHASE 2
I
I
I
I
I
I
i
)CA-58 & Coffee Rd, Rd,
Bakersfield, CA' 193312
Kimley»Horn
f
l
I HHthttII IIP -rr’rrhti
, I II J I I I 11 I I 11 I I -(HHHHHHs1 7/"E TJIHHHHHIU I Ji f 0111
w
III :
|)
I 11
Riverview Marketplace Commercial Project
Environmental Impact Report 2 Project Description
City of Bakersfield – SCH No. 2025101507 2-12
This page intentionally left blank.
Riverview Marketplace Commercial Project
Environmental Impact Report 2 Project Description
City of Bakersfield – SCH No. 2025101507 2-13
2.2.2 Access, Circulation, and Parking
Vehicular access to the Project Site would be provided via a proposed driveway along El Toro Viejo Road; three right-in/right-out only driveways and a signalized driveway along Rosedale Highway; and two right-in/right-out only driveways and a signalized driveway along Coffee Road.
The signalized driveways would function as the main entries into the Project Site, with secondary access provided via the non-signalized driveways. Combined, the proposed driveways would provide a direct connection to the comprehensive drive aisle system proposed within the parking areas of the Project Site. The Project would include sidewalk improvements along Project frontages.
Proposed off-site improvements include modification to the existing signalized intersection of Coffee Road and Jet Way. Specifically, the improvements would include the installation of a new traffic light pole/structure at the southeast corner of the Coffee Road and Jet Way intersection and any necessary roadway improvements (i.e., modification to the existing raised median to provide a dedicated left-turn lane and roadway striping).
For the existing signalized intersection of Rosedale Highway and Northwest Promenade, which is the street that provides vehicular access to the commercial retail center north of the Project Site, no improvements or modifications to the traffic signal poles/structures would occur. However, a portion of the raised median on Rosedale Highway (the portion between Northwest Promenade and Coffee Road) would be modified to provide a dedicated left-turn lane for west-bound traffic entering the Project Site at the signalized intersection. Other roadway improvements at this intersection would include striping.
Parking for employees, customers and visitors would be provided onsite in dedicated surface parking areas throughout the Project Site. Pursuant to the parking provisions of the Bakersfield Zoning Code (BMC Chapter 17.58), 1,760 parking spaces would be required to serve the mix of uses and the Project would exceed that amount and provide 1,913 spaces. Additionally, pursuant to the provisions of the Bakersfield Development Code and the most current (2019) California Green Building Standards Code (CALGreen; Title 24, California Code of Regulations, Part 11), which are codified in Chapter 15 (California Green Building Standards Code) of the Bakersfield Municipal Code, parking spaces for handicap, van accessible, and clean-air vehicles would be provided among the 1,913 spaces.
2.2.3 Pedestrian Access and Circulation
Pedestrian access to the Project Site would be provided via public sidewalks (10-foot-wide meandering multi-use paths) along Rosedale Highway and along Coffee Road. Internal walkways would connect to the public sidewalks at key locations along Rosedale Highway and Coffee Road.
The internal walkways would provide access to the various uses and areas of the Project. The internal sidewalks would also provide connectivity to the Project’s “play area” that would consist of landscaped mounds, benches, picnic tables, bike racks, and a lawn area. Also, striped crosswalks would be provided at key locations to allow for safe pedestrian crossing.
2.2.4 Loading and Deliveries
Loading and unloading of delivery trucks for the major retail buildings would occur in the designated loading dock of that building, which are toward the rear of the buildings. For the tenants of the outlying building pads, loading and unloading of delivery trucks would occur in Riverview Marketplace Commercial Project
Environmental Impact Report 2 Project Description
City of Bakersfield – SCH No. 2025101507 2-14
designated areas (within proximity of the tenants) that would not impede the internal vehicular circulation system. No loading or unloading activities would occur in the parking areas or non-designated loading/unloading areas.
2.2.5 Design Concept
The Project proposes to transform an underutilized site into an active infill commercial center that would create economic, retail and service opportunities in an area served with existing infrastructure and public services. The Project would provide for economic growth and revenue generation to the City through creation of a flexible, market-driven development that responds to the existing and future needs and demands of Bakersfield's commercial markets.
The Project would have a contemporary architectural design with articulated facades. (See Figure 2-5: Renderings). Buildings would have a maximum height of 90 feet. Building materials would include but not be limited to cement plaster with stone veneer, aluminum wood siding metal canopies, and large display windows. Careful and judicial use of landmark buildings, as well as signage, distinctive landscape palettes, and other such elements would provide an identity and cohesiveness to the Project Site. Along the Coffee Road Frontage and Rosedale Highway frontages would run a “dry creek” aesthetic feature composed of decorative cobbles and decomposed granite and crushed rocks.
2.2.6 Open Space and Landscaping
The Project would feature 325,120 square feet of new landscaping along the entire site perimeter and internal to the Project Site. Landscaping would include a variety of ornamental trees, shrubs, and groundcover that would help soften the massing of the buildings, provide for a pedestrian oriented experience, and provide shade. Within the parking lot area would be 443 trees and the Project would include 122 street trees (79 trees provided on Coffee Road and 43 on Rosedale Highway) plus 534 trees within the Project Site for a total of 656 trees. Types of trees would include Marina Strawberry tree, Western Redbud, Chinese Flame tree, Canary Island Pine, California Sycamore, Coast Live Oak, Holly Oak, Cork Oak, Interior Live Oak, Brisbane Box, Chinese Elm, and Majestic Beauty Indian Hawthorn. See Figure 2-6: Landscape Concept Plan and Figure 2-7: Street Frontage Enlargements.
The Project would also include enhanced paving areas within small plaza areas in front of storefronts, and enhanced vehicular paving at entry points. The Project would include a detention basin on the northern portion of the Project Site that would be fenced and screened with landscaping. Near the detention basin would be a play area which would include landscaped mounds, benches, picnic tables, bike racks, and a lawn area.
SOURCE: McG Architecture, 2025
FIGURE 2-5: Renderings
RIVERVIEW MARKETPLACE COMMERCIAL PROJECT
105
103 ROSEDALE HIGHWAY
bha
SoazLsoss ■ eD
At Copay | G9 SIERRA /Marshalls
— MA I* II
Si
—
EP I , .5.
IS
mm"
lm
-
M. uhl
01 04
"n: A-. ,at "FEs #*r“5 S3 B
EBI GPrcakFctoy
5 mi alutts PVe .2 wWa w
•J* J
“w.
L
as ep 417 sa
02 05
—
“"Ius uh wall
e-60 .7 J - i gand)
e. TAE-si,, a 857
• 4I
A
75 3
«
w
d ’ *
03 06
Kimley»Horn
• *
_ a
AREA RESERVED FOR
CITY STAMP
• “
LOCATION PLAN
N.T.S.
2,**
ErA==-a A
— A -je- ee.
=* '
tuinoon CEee na/ece
ETe-aann
(02
? (04
IS?
,= aa t -
Bi
Riverview Marketplace Commercial Project
Environmental Impact Report 2 Project Description
City of Bakersfield – SCH No. 2025101507 2-16
This page intentionally left blank.
FIGURE 2-6: Landscape Concept Plan
RIVERVIEW MARKETPLACE COMMERCIAL PROJECT ROSEDALE & COFFEE RD - RIVERVIEW MARKET ©
SIGNATURE
L I CENSED LANDSCA PE ARCH I T ECT
MICHAEL A . LEDBETTER 5553
STATE OF CAL I FORN IA
RENEWAL DATE
DATE
L-1
NOT FOR CONSTRUCTION LANDSCAPE CONCEPT PLAN
0 50’ 100’ 200’ LEGEND
TREE LEGEND
SHRUB LEGEND
CITY OF BAKERSFIELD LANDSCAPE REQUIREMENTS 17.61.030
ALL TREE TO BE 24” BOX AND 2” DBH
ALL SHRUBS TO BE 5 GALLON WITH SPACING APPRORIATE FOR PLANT SPECIES ALL GROUND COVERS TO BE 1 GALLON WITH AVERAGE SPACING OF 18” O.C.
DRIVE-THRU LANES AND STREET FACING PARKING SHALL BE SCREENED BY EVERGREEN HEDGE WITH MIN. HEIGHT OF 4’.
TOTAL NEW LANDSCAPE AREA PROVIDED: 325,120 SQUARE FEET
TREES IN PARKING LOT REQUIRED 1 TREE / 6 PARKING STALLS 1,977 STALLS / 6 = 330 TREES REQUIRED
443 TOTAL TREES PROVIDED
TOTAL PARKING LOT AREA: 503,853 SQUARE FEET
DOES NOT INCLUDE PARKING AREA BEING PROVIDED WITHIN THE PG&E EASEMENT 503,853 x 40% = 201,541 SQUARE FEET SHADING REQUIRED
203,800 SQUARE FEET SHADING PROVIDED (40.4%)
MINIMUM 30% OF PARKING LOT TREES REQUIRED TO BE EVERGREEN 443 TREES PROVIDED x 30% = 133 EVERGREEN TREES REQUIRED 245 EVERGREEN TREES PROVIDED (55.3%)
COFFEE ROAD STREET REQUIREMENTS
STREET FRONTAGES: (1) TREE TO BE PLANTED EVERY TWENTY LINEAR FEET TOTAL STREET FRONTAGE ON COFFEE ROAD: 1,560 LINEAR FEET 1,560 SQUARE FEET / 20 = 78 TREE REQUIRED
79 TOTAL TREES PROVIDED ON COFFEE ROAD
STREET TREES SHALL BE 70% DECIDUOUS & 30% EVERGREEN MIX TOTAL NUMBER OF STREET TREES PROVIDED ON COFFEE ROAD: 79 DECIDUOUS TREES: 55 (70%)
EVERGREEN TREES: 24 (30%)
ROSEDALE HWY STREET REQUIREMENTS
* STREET FRONTAGE REQUIREMENT CANNOT BE MET ON ROSEDALE HWY PER PG&E TRANSMISSION LINE REQUIREMENTS.
STREET FRONTAGES: (1) TREE TO BE PLANTED EVERY TWENTY LINEAR FEET TOTAL STREET FRONTAGE ON ROSEDALE HWY: 1,560 LINEAR FEET 2,300 SQUARE FEET / 20 = 115 TREE REQUIRED
43 TOTAL TREES PROVIDED ON ROSEDALE HWY
STREET TREES SHALL BE 70% DECIDUOUS & 30% EVERGREEN MIX TOTAL NUMBER OF STREET TREES PROVIDED ON ROSEDALE HWY: 43 DECIDUOUS TREES: 8 (7% OF TOTAL REQUIRED STREET TREES)
EVERGREEN TREES: 35 (30% OF TOTAL REQUIRED STREET TREES) 1 4
2 5
3 6
PLAZA AREAS TO INCLUDE ENHANCED
PAVING, OUTDOOR SEATING, ACCENT
PLANT MATERIAL AND LIGHTING.
STORE FRONT PAVING TO INCLUDE
ENHANCED PAVING, BANDING AND
ACCENT PLANTING.
TRUCK LOADING DOCK AREAS PER
ARCHITECT’S PLANS.
SHOPPING CENTER - MULTI-TENANT
MONUMENT SIGNAGE.
ENHANCED VEHICULAR PAVING AT
ENTRY WITH THEMATIC ELEMENTS (SEE
ENLARGEMENTS)
DETENTION BASIN WITH FENCING,
VEHICULAR ACCESS, AND LANDSCAPE
SCREENING.
ARBUTUS X ‘MARINA’
MARINA STRAWBERRY TREE
CERCIS OCCIDENTALIS
WESTERN REDBUD
KOELREUTERIA BIPINNATA
CHINESE FLAME TREE
PINUS CANARIENSIS
CANARY ISLAND PINE
PISTACIA CHINENSIS
CHINESE PISTACHE
PLATANUS RACEMOSA
CALIFORNIA SYCAMORE
QUERCUS AGRIFOLIA
COAST LIVE OAK
QUERCUS ILEX
HOLLY OAK
QUERCUS SUBER
CORK OAK
QUERCUS WISLIZENI
INTERIOR LIVE OAK
RHAPHIOLEPIS X ‘MONTIC’
MAJESTIC BEAUTY INDIAN
HAWTHORN
TRISTANIA CONFERTA
BRISBANE BOX
ULMUS PARVIFOLIA
CHINESE ELM
75 74
109
34 87
8 11
68 85
8 35
16 46
SHRUBS AND GROUNDCOVERS SEE
COMPLETE LEGEND ON SHEET L-5.
BOTANICAL & COMMON NAME QTY
EL TORO VIEJO RD
ROSEDALE HWY SEE ENLARGEMENT A
SHEET L-3
SEE OPEN SPACE ENLARGEMENT
SHEET L-4
PROPERTY LINE
PROPERTY LINE
PG&E POWER EASEMENT LINE
PROPERTY LINE
PROPERTY LINE
SEE ENLARGEMENT B
SHEET L-3
EXISTING PG&E
TRANSMISSION
STATION N.A.P.
STORAGE
BLDG
RESTAURANTS
CAR WASH
RESTAURANT
RESTAURANTS
MAJOR A
HEALTH CLUB
MAJOR B
MARKET
MAJOR C
MAJOR D
RETAIL
MAJOR E
RETAIL
MAJOR F
RETAIL
MAJOR G
RETAIL
MAJOR H
RETAIL
MAJOR I
RETAIL
MAJOR J
RESTAURANT
RESTAURANT
RETAIL
RETAIL
MEDICAL
OFFICE
DRIVE
THRU
RETAIL RETAIL
RETAIL
RETAIL
RETAIL
RETAIL
RETAIL
REST.
GAS STATION
COFFEE RD
1 2
2 3
3 3
4 5 5
6 RESTAURANTS
& RETAIL
R/W
R/W
R/W R/W R/W R/W
R/W
4 PG&E POWER EASEMENT LINE PG&E POWER EASEMENT LINE
PG&E EASEMENT
RESTAURANT
SOURCE: Kimley-Horn, 2025
IIIE"TIIIIIII
T
T
H ♦
Q%
——
H
Know whats below, Call811beloceyoudiy,
"" ht -a
Hh-HmHmnmr:
I 8y r"
Kimley>»Horn
10 1
—7
4 ■
t ’I
r
I
■ 1
■
. - --- - I£ 5 1 ■ —=?—2"—em
s
„ I
m=rsam
1 B OEE
C L t i ( J
006 0600060 090©
1 bq
t
JI
f
Riverview Marketplace Commercial Project
Environmental Impact Report 2 Project Description
City of Bakersfield – SCH No. 2025101507 2-18
This page intentionally left blank.
SOURCE: Kimley-Horn, 2025
FIGURE 2-7: Street Frontage Enlargements
RIVERVIEW MARKETPLACE COMMERCIAL PROJECT ROSEDALE & COFFEE RD - RIVERVIEW MARKET ©
SIGNATURE
L I CENSED LANDSCA PE ARCH I T ECT
MICHAEL A . LEDBETTER 5553
STATE OF CAL I FORN IA
RENEWAL DATE
DATE
L-3
NOT FOR CONSTRUCTION STREET FRONTAGE ENLARGEMENTS
LEGEND
SHOPPING CENTER - MULTI-TENANT MONUMENT SIGNAGE
EXISTING POWER POLE (PROTECT IN PLACE)
ENHANCED PAVING AT ENTRY DRIVE
8 FT CURVILINEAR SIDEWALKS, TYP.
ENTRY WALLS WITH PILASTER
BOULDER OUTCROP, TYP.
DECORATIVE COBBLE / DRY CREEK, TYP.
DECOMPOSED GRANITE / CRUSHED ROCK, TYP.
SCREENING FOR DRIVE-THRU / PARKING
(4 FT. HIGH PLANTING OR WALL)
PEDESTRIAN BRIDGE, TYP.
TENANT PATIO, TYP.
TRASH ENCLOSURE, TYP.
PG&E EASEMENT 1
2 6 10
3 7 11
11 4 8 12
5 9 A
0 10’ 20’ 40’
0 10’ 20’ 40’
9 9
3 3
5 5
1 6
6 7
7 8 2
10 4
4 12
A
B
FAST CASUAL
RESTAURANTS
ROSEDALE HWY FRONTAGE ENLARGEMENT
COFFEE RD FRONTAGE ENLARGEMENT
RESTAURANT
OVERHEAD POWER LINE ABOVE OVERHEAD POWER LINE ABOVE
ROSEDALE HWY
COFFEE RD
RESTAURANT
RETAIL RETAIL
RETAIL
A A
ed AP.9*PS
Es
d LQ
(• ■.
- 1
. i Jt Iw
s —4
IP
“ene aa..
57605588
w
CI
fa
---
wnt*
7 llils
YYg K
(O
JEAP
LO V
an
-a
aandees
1- - hy
■
-
*
" nuce
Soedet.
Th
I
ontszpt
kig
Hett) 50/86/90
LQ
i
■
8 ata
-c*—
1 ©
th
©
Kimley>»Horn
Tseumegry 3ewu
I
fun
A&AE
*
GlE
ETa Mall o
T
EE
II
me
1 I
5 -r
• • • •
s
• • • •• • • •
Riverview Marketplace Commercial Project
Environmental Impact Report 2 Project Description
City of Bakersfield – SCH No. 2025101507 2-20
This page intentionally left blank.
Riverview Marketplace Commercial Project
Environmental Impact Report 2 Project Description
City of Bakersfield – SCH No. 2025101507 2-21
2.2.7 Lighting and Signage
Lighting for the Project is intended to minimize light trespass and glare from the Project Site onto adjacent properties and to provide safety and nighttime visibility through shielded, focused, and directed illumination. Lighting would consist of exterior building-mounted light fixtures; interior lighting for the new buildings; lighting for pedestrian walkways and common gathering areas; lighting for the green spaces; ground-mounted decorative lighting for landscape and architectural features; signage lighting; lighting for the new parking areas, drive aisles, and loading dock areas; and security lighting.
The Project is anticipated to require a number of sign types that would help identify and promote the Project and its businesses and tenants. Sign types would include multi-tenant pylon and monument signs, project identification monument signs, tenant wall signs, and on-site directional and legal signs.
2.2.8 Infrastructure Improvements
Water, Wastewater, and Drainage
Project development would include construction of all necessary on- and off-site infrastructure improvements to adequately serve the Project’s water, wastewater, and drainage needs. Water and wastewater services would be provided by the City. All proposed infrastructure and improvements would require City approval and where necessary, approval by the utility/service provider.
Solid Waste and Recycling Services
Solid waste and recycling generated by the Project would be collected and hauled away by and transported to/disposed of at the appropriate facilities. Enclosures with solid roof tops and swinging gates that would accommodate bins for solid waste, organic waste, and recyclable materials would be provided in various areas of the Project Site, generally to the rear of future commercial buildings in order to minimize views from parking areas and surrounding streets.
Utilities and Service Systems
Plans for utilities and service systems that would serve the Project include provision of electricity (PG&E), natural gas (PG&E), and telecommunications (AT&T and Spectrum). All new utility infrastructure would be installed underground or placed in enclosed spaces (e.g., utility closets).
2.2.9 Operational Hours
The anticipated operating hours of the businesses that would ultimately occupy the buildings are not yet known at this time. However, the hours of operation for each use would vary with some business opening and closing sooner than other uses, and others only being open during the week. For example, the major markets and retails use hours could be from 8:00 AM to 10:00 PM Monday through Sunday, whereas the medical office use could operate from 9:00 AM to 5:00 PM Monday through Friday.
2.2.10 Sustainability Features
The Project would be an infill development that promotes the sustainable principles of smart growth. Compliance with state laws regarding water and energy conservation, including Title 24, Riverview Marketplace Commercial Project
Environmental Impact Report 2 Project Description
City of Bakersfield – SCH No. 2025101507 2-22
also would result in increased efficiency and sustainability. Landscaping is anticipated to be native and drought tolerant and would comply with the Model Water Efficient Landscape Ordinance (MWELO) per Section 17.61.060, Landscape Plan Requirements of the City of Bakersfield Municipal Code.
2.3 Project Phasing and Construction
Project development is anticipated to be completed in two development phases, as illustrated in Figure 2-4, Site Plan Phasing. The first phase would consist of development of 37.8 acres located at the north end of the Project, as well as associated off-site improvements. The second phase would result in development of the remaining 8.36 acres at the south-east end of the Project. It should be noted that the Project applicant may decide to accelerate or postpone the second phase depending on market conditions.
Project buildout is anticipated to occur over an approximately 20-month timeframe, commencing in late 2026 and ending in Quarter 2 2028. Phase 1 is anticipated to commence in late 2026 and be completed by late 2027, with Phase 2 commencing in late 2027 and completed by Quarter 2 2028. The Project would be consistent with the Bakersfield Municipal Code Section 9.22.050, “Noise during construction.” The City prohibits construction activities from 9:00 pm to 6:00 am Monday through Friday (including federal holidays), and before 8:00 am or after 9:00 pm on weekends that produce loud or unusual noise which annoys or disturbs a reasonable person of normal sensitivity.
2.4 Requested Permits and Approvals
The anticipated requests for approval of the Project are listed below in Table 2-2: Matrix of Project Approvals/Permits. The Environmental Impact Report would analyze impacts associated with the Project and would provide environmental review sufficient for all necessary entitlements and public agency actions associated with the Project. The discretionary entitlements, reviews, permits and approvals required to implement the Project include, but are not necessarily limited to, the following:
• Site Plan Review consistent with the Bakersfield Municipal Code Section 17.08.140. • General Plan Amendment (GPA) of the land use element of the Metropolitan Bakersfield General Plan (General Plan) from P (Public Facilities) to LI (Light Industrial) • Tentative Tract Map
• Comprehensive Sign Plan
Riverview Marketplace Commercial Project
Environmental Impact Report 2 Project Description
City of Bakersfield – SCH No. 2025101507 2-23
Table 2-2: Matrix of Project Approvals/Permits
Agency Approvals and Decisions
City of Bakersfield Discretionary Approvals
Planning Commission • Certify or reject the Project’s EIR City Council • Approve, conditionally approve, or not approve the general plan amendment
• Provide direction to the Development Services Director whether to approve, conditionally approve, or not approve Site Plan Review
Development Services Director • Approve, conditionally approve, or not approve Site Plan Review
Subsequent City of Bakersfield Approvals
Development Services Director • Approve, conditionally approve, or not approve any subsequent Site Plan Reviews or modifications thereto
pertaining to the Project site.
Development Services Department and
Public Works Department
• Issue grading permits
• Issue building permits
• Accept public right-of-way dedications
• Approve road improvement plans
• Issue encroachment permits
• Approve proposed sewer connections and improvements
Other Agencies – Subsequent Approvals and Permits
Central Valley Regional Water Quality
Control Board
• Issue a Construction Activity General Construction Permit • Confirm Compliance with National Pollution Discharge
Elimination System (NPDES) Permit and Waste
Discharge Requirements
San Joaquin Valley Air Pollution Control
District
• Approve and/or implement any Voluntary Emissions
Reduction Agreements (VERA) entered into by the Project Applicant
• Approve permits to construct and permit to operate (if such permits are required)
Kern County Flood Control and Water
Conservation District
• Approve proposed drainage infrastructure and
improvements
Pacific Gas & Electric • Approve connections to the electric distribution and natural gas distribution systems
California Water Service • Approve proposed connections to the domestic water system
Riverview Marketplace Commercial Project
Environmental Impact Report 2 Project Description
City of Bakersfield – SCH No. 2025101507 2-24
This page intentionally left blank.
City of Bakersfield – SCH No. 2025101507 3-1
3. Environmental Setting
CEQA Guidelines Section 15125 requires that an EIR includes a description of the existing environment. This chapter provides a general overview of the environmental setting for the Project, however detailed information on existing conditions for each environmental resource area evaluated in this Draft EIR is provided in Chapter 4: Environmental Impact Analysis. This chapter also provides an overview of related projects that are considered in the Draft EIR in evaluating cumulative impacts that could result from the Project together with other projects.
3.1 Regional Setting
Figure 1, Regional Map, depicts the proposed Project site in a regional context. The Project Site is located the northwestern portion of the City of Bakersfield (City), within Kern County. The City is approximately 112 miles north of the City Los Angeles. The City is bordered by Sequoia National Forest to the east and the Los Padres National Forest is located to the west. The Kern River runs through the City, south of the Project Site.
3.2 Project Site Setting
Figure 2, Local Vicinity Map, depicts the proposed Project site and immediate vicinity. The Project Site is 46.16 acres which consists of one legal parcel (APN 368-010-05) which is an undeveloped L-shaped property situated along the south side of Rosedale Highway, north of the railroad tracks, west of Coffee Road, and east of El Toro Viejo Road.
Nearby uses include Rosedale Highway and a commercial retail center (Northwest Promenade), to the north; a Pacific Gas & Electric (PG&E) electric substation and vacant land to the south; El Toro Viejo Road, commercial retail, and a PG&E electric substation to the west; and Coffee Road, Friant-Kern Canal, and a commercial retail center to the east. The Project Site is located on a portion of a larger property formerly occupied by the PG&E Kern Power Plant. The Project Site is currently secured on all sides by six-foot-tall chain-link fencing, with vehicular access provided via gated unpaved entry drives along Coffee Frontage Road and one concrete paved driveway along Rosedale Highway. Both Coffee Road and Rosedale Highway are improved with concrete curb and gutters, yet only Rosedale Highway is fully developed with a concrete sidewalk. A portion of Coffee Road is improved with a concrete sidewalk. Existing onsite features include abandoned oil wells; electrical transmission lines on metal poles, towers, and wooden poles; and several dirt roads and mounds.
3.3 Cumulative Development
Section 15355 of the CEQA Guidelines defines “cumulative impacts” as “two or more individual effects which, when considered together, are considerable or which compound or increase other environmental impacts.” This means that while the impacts of projects on their own may be insignificant, when analyzed in combination with impacts from other projects in the vicinity, they may be significant. CEQA Guidelines section 15130 requires EIRs to discuss the cumulative impacts of a project “when the project’s incremental effect is cumulatively considerable.” Riverview Marketplace Commercial Project
Environmental Impact Report 3 Environmental Setting
City of Bakersfield – SCH No. 2025101507 3-2
Each impact analysis discussion provided in Section 4, Environmental Impact Analysis, includes a cumulative impacts discussion. Table 3-1, Cumulative Projects List, identifies the projects in the Project vicinity with potential to result in cumulative impacts.
Table 3-1: Cumulative Projects List
Project Location
VTPM 12376 - Proposing to divide a 9.65 acre site into a 3.00 acre parcel and a 6.71 acre parcel
7131 Charity Ave, Bakersfield, CA
LLA 32-20 an adjustment of lot lines resulting in a 10,753 sf lot, a 10,807 sf lot, and a 4.56 acre lot.
11709 Cactus Dr, Bakersfield, CA
PMW 3-21 - proposing to redefine Parcel 3 of PM 4690 for condominium purposes
2910 Gibson St, Bakersfield, CA
LLA 17-21 An adjustment of lot lines resulting in a 38,907 sf (gross) parcel and a 5.02 ac (gross) parcel
2932 Henry Ln, Bakersfield, CA
LLA 28-21 An adjustment of lot lines between two
parcels
2321 Wheeler St, Bakersfield, CA
LLA 28-21 proposed to adjust the lot lines between
three parcels resulting in a 9,536 sf (net) parcel and a 10,725 sf (net) parcel
2321 Wheeler St, Bakersfield, CA
TPM 12439 proposing to divide a 4.77 ac site into three parcels ranging in size from 0.50 ac (net) to 2.38 acre (net)
Northwest corner of Brimhall Rd and
Verdugo Ln
VTPM 12500 proposing to divide a 5.03 ac site into a
1.59 ac (net) parcel and a 3.31 ac parcel
3215 Fruitvale Ave, Bakersfield, CA
LLA 21-23 - An adjustment of lot lines to combine two
parcels resulting in a 1.79 ac parcel
10302 Holland St, Bakersfield, CA
LLA 37-23 An adjustment of lot lines to combine three
parcels resulting in a 36,179 sf parcel
9711 Rosedale Hwy, Bakersfield, CA
TPM 12529 proposed the division of a 2.77 ac site into four parcels ranging in size from 17,745 sf (gross) to 17,753 sf (gross) and a 1.14 ac (gross) DR
10117 Meacham Rd, Bakersfield, CA
TPM 12512 Proposing the division of a 2.39 ac parcel into 4 parcels ranging in size from 13,000 sf (net) to 23,979.20 sf (net) and a 21,707.40 sf (net) designated remainder
9921 Shellabarger Rd, Bakersfield, CA
Map 102-23, DOPC, Christian Castaneda, Liquor License
Determination
4208 Rosedale Hwy, Bakersfield, CA
PD, Map 102-29 for Two Medical Office Buildings 1710 Calloway Dr, Bakersfield, CA PD, Map 102-21 for Warehouse and Office Buildings 0 Downing Ave, Bakersfield, CA Zone Change 133, PD 72, Map 102 for Office/Medical
Building
Downing Ave, Bakersfield, CA
PD 66, Map 102 for PD Mod in Change in Use. 3230 Fruitvale Ave, Bakersfield, CA CUP, Map 102-26 - Auto Dismantling Facility 4100 Burr St Bakersfield, CA Map 102-30, CUP - Contractors Storage Yard 9935 Rosedale Hwy, Bakersfield, CA A modification to PD 32, Map 102-21. A proposal to convert a carwash to an office/warehouse and construct a new 5,000 square foot warehouse.
3714 Coffee Rd, Bakersfield, CA
DOPC, Breakers, Map 102-30 10511 Rosedale Hwy, Bakersfield, CA Map 101-24, PD 11709 Cactus Dr, Bakersfield, CA
Map 102-30, Determination Similar Use - Furniture Store 9935 Rosedale Hwy, Bakersfield, Ca Riverview Marketplace Commercial Project
Environmental Impact Report 3 Environmental Setting
City of Bakersfield – SCH No. 2025101507 3-3
Project Location
Map 102-21, ZV - Landscape Reduction KCPWD Patton Way
Road Yard
Rosedale Hwy and Coffee Rd
Map 102-21, PD - Office Warehouse;
Project: (a) A Precise Development Plan to develop six (6), 4,500-square-foot buildings for the following uses: three (3) buildings offering industrial services (Section 19.38.020.D.5), two (2) buildings offering indoor contractor storage (Section
19.38.020.E.2) and one (1) building offering indoor
manufacture/assembly uses (Section 19.38.020.E.1) with
associated parking and landscaping;
and (b) A Zone Variance requesting a reduction in parking for a total of 96 parking spaces where 111 spaces are
required (Section 19.106.040) on an approximate 2.38-acre parcel in a M-2 PD (Medium Industrial—Precise
Development Combining) District. Project is proposed to be constructed in phases.
3017 Fruitvale Ave, Bakersfield, CA
Map 102-30, PD 1 - Modification to Parking Stalls and Striping 10525 Rosedale Hwy, Bakersfield, CA Map 102-21, DOPC, Rosedale Station 6600 Rosedale Hwy, Bakersfield, CA Map 102-30, CUP - Residential Accessory Structure 10021 Rosedale Hwy, Bakersfield, CA Map 102-30, GPA - Change in designation from SR to HMR
on 4.77 ac;
ZCC from E (1/2) RS to R-2 CL on 4.77 acres
10021 Rosedale Hwy, Bakersfield, Ca
PD-Trucking facility trailer drop off yard and 8,000 sq ft storage building accessory to trailer parking
7121 Charity Ave, Bakersfield, CA
Map 102, CUP 55
Modification Additional Truck Parking
7121 Charity Ave, Bakersfield, CA
CUP Map 101-24
Wells are contaminated with TCP and Nitrate, and treatment plant is needed to treat wells to bring levels down to lower than regulatory maximum contaminant level.
33592 Rosedale Hwy, Bakersfield, CA
Map 102-29, PD 24, Mod - Electrified Perimeter Fencing 8929 Rosedale Hwy, Bakersfield, CA PD 73, Map 102; A Precise Development Plan requesting
construction of an approximate 3,720-square-foot
office and an approximate 4,500-square-foot warehouse with an associated roof-only canopy for storage
(Section 19.38.020.D.1 & Section 19.38.020.E.2) on an
approximate 38,029-square-foot portion of an
approximate 2.98-acre parcel in an M-2 PD District.
Wedding Ln, South Of Charity Ave
Map 102-30, CUP 31, 34, Mod - New Computer Lab Bldg 10218 Greenacres Dr, Bakersfield, CA Map 102-21, PD 48, Mod - Security System Fencing 3541 Alken St, Bakersfield, CA Map 101-25, PD 6, Mod - New Roof Canopy at Carwash 11921 Rosedale Hwy, Bakersfield, CA Map 102-21, ZCC - E(5) RS to M-1 PD- Closed 3500 Patton Wy, Bakersfield, CA Map 102-29, PD - New Dental Office Bldg. 2520 Calloway Dr, Bakersfield, CA Map 102-21, PD 40, Mod - Security Fence System 3611 Alken St, Bakersfield, CA Map 102-19, ZM - Accessory Structure Taller than Primary Residence;
PROPOSAL: A Zone Modification to construct a 23 feet 9- inch tall, accessory building where 20 feet is
authorized (Section 19.08.180.A.3) on a 32,670-square-foot acre parcel zone E (10) RS (Estate - 10
acres - Residential Suburban Combining) District.
10409 Meacham Rd, Bakersfield, CA
Map 102-21, CUP - KCPWD Household Hazardous Waste
Facility.
3611 Alken St, Bakersfield, CA
Riverview Marketplace Commercial Project
Environmental Impact Report 3 Environmental Setting
City of Bakersfield – SCH No. 2025101507 3-4
Project Location
Map #101 - PD 6- Mod to PD 6, Map 101, PD to add 22' x 72' covered solar structure over portion of KFC drive thru lane, on a C-2 PD zone.
11935 Rosedale Highway, Bakersfield, CA
Kern County Housing Element Implementation 2022; Various changes to existing land use designations to facilitate future higher density residential development as required by the adopted Kem County Housing Element. Proposed actions
include amendments to existing General and Specific Plan map code designations and changes to existing zone
classifications. A series of proposed Staff initiated changes to various land use designations on 56 parcels throughout
unincorporated Kem County. The proposed project includes necessary actions that would establish land uses suitable for future high-density residential development projects. At this time, the proposed project does not include any proposed development. This proposal only includes changes in land use designations to facilitate future residential
developmental ranging from apartment complexes to other owner-occupied higher density development
projects.
435 Panama Rd, Bakersfield, CA
ZCC from E(10) RS to E1/4 in a SR general plan designation to facilitate a future residential subdivision of 4 parcels and one remainder on 2.77 acres.
10117 Meacham Rd, Bakersfield, CA
ZCC from E(10) RS to E1/4 in a SR general plan designation to facilitate a future residential subdivision of 4 parcels and one remainder on 2.77 acres.
10117 Meacham Rd, Bakersfield, CA
ZCC to R-2 and E(1/4) 4112 Jewetta Ave, Bakersfield, CA CUP for transitional housing (16 residents) 10105 Laurie Ave, Bakersfield, CA Map 102-30, ZCC - Change in zone classification from E (2 1/2) RS to E (1/4) on 2.39 acres
9921 Shellabarger Rd, Bakersfield, CA
Zone modification for fence height of 8 feet 10809 Paul Ave, Bakersfield, CA CUP for cargo container 2430 Calloway Dr, Bakersfield, CA Source: City of Bakersfield Development Services Department City of Bakersfield – SCH No. 2025101507 4-1
4. Environmental Impact Analysis
4.1 Introduction
This chapter of the Draft Environmental Impact Report (Draft EIR) discusses the potential environmental effects of the Riverview Marketplace Commercial Project (Project). As discussed in Section 1.5, Organization of the Draft EIR, the discussion provided in this chapter is arranged by environmental issue analyzed:
• Aesthetics
• Agriculture and Forestry Resources
• Air Quality
• Biological Resources
• Cultural Resources
• Energy
• Geology and Soils
• Greenhouse Gas Emissions
• Hazards and Hazardous Materials
• Hydrology and Water Quality
• Land Use and Planning
• Mineral Resources
• Noise
• Population and Housing
• Public Services and Recreation
• Transportation
• Tribal Cultural Resources
• Utilities and Service Systems
• Wildfire
Riverview Marketplace Commercial Project
Environmental Impact Report 4 Environmental Impact Analysis City of Bakersfield – SCH No. 2025101507 4-2
Discussion within each section is established as follows:
Regulatory Setting. The regulatory setting identifies the applicable federal, state, regional, and/or local laws, regulations, and applicable to the Project.
Environmental Setting. The environmental setting discusses existing conditions at the proposed Project site and in the surrounding area at the time the NOP was published. The purpose of the environmental setting is to describe the “baseline condition” the City of Bakersfield will use to compare to the Project for purposes of identifying whether the Project would result in significant impacts.
Impact Analysis. The impact analysis discussion describes the methodology employed to analyze the effects of the proposed Project on each environmental issue. This section also identifies the thresholds of significance employed to determine whether the proposed Project would produce a significant impact. Finally, potential project impacts are discussed per the threshold significance criteria.
Mitigation Measures. Mitigation measures are feasible actions, conditions, or project modifications identified to avoid, minimize, rectify, reduce, or compensate for significant environmental impacts that could result from implementation of the Project. Where applicable, these measures are incorporated to reduce impacts to a less than significant level and are identified with corresponding monitoring or compliance requirements.
Cumulative Impact Analysis. The cumulative impact analysis evaluates whether the Project’s incremental contribution to a cumulative environmental effect would be cumulatively considerable when viewed together with the effects of past, present, and reasonably foreseeable probable future projects, which are identified in Table 3-1 in Section 3.0, Environmental Setting, of this Draft EIR. This analysis considers the geographic scope and context of each resource topic to determine whether the Project would contribute to a significant cumulative impact.
City of Bakersfield – SCH No. 2025101507 4.1-1
4.1 Aesthetics
This section discusses impacts associated with the potential for the proposed Riverview Marketplace Commercial Project (Project) to degrade the existing visual quality of the Project Site and its surroundings through changes in the existing landscape. Potential effects are evaluated relative to important visual features (e.g., scenic highways and scenic features), and the existing visual landscape and its users. Degradation of the visual character of the Project Site is usually addressed through a qualitative evaluation of the changes of the aesthetic characteristics of the existing environment. Information in this section is based, in part, on photos of the Project Site, the Metropolitan Bakersfield General Plan (General Plan), the City of Bakersfield Municipal Code (Municipal Code) and the City of Bakersfield (City) Land Use Zoning Ordinance (Zoning Ordinance).
During the scoping period for the Project’s Environmental Impact Report (EIR), no comments were received in response to the Notice of Preparation (NOP) related to aesthetics.
4.1.1 Regulatory Setting
State
California Department of Transportation Scenic Highway Program The California Scenic Highway Program, maintained by the California Department of Transportation (Caltrans), was created by the State Legislature in 1963. The purpose of the State Scenic Highway Program is to protect and enhance the natural scenic beauty of California highways and adjacent corridors, through special conservation treatment. The State laws governing the Scenic Highway Program are found in the Streets and Highways Code, Sections 260 through 263. A highway may be designated scenic depending upon how much of the natural landscape can be seen by travelers, the scenic quality of the landscape, and the extent to which development intrudes upon the traveler’s enjoyment of the view. The State Scenic Highway System includes a list of highways that are either eligible for designation as scenic highways or have been officially designated. The status of a proposed state scenic highway changes from eligible to officially designated when the local governing body applies to Caltrans for scenic highway approval, adopts a Corridor Protection Program, and receives notification that the highway has been officially designated a Scenic Highway.
Local
Metropolitan Bakersfield General Plan
The City’s General Plan, dated December 2002, was updated in January 2016 per Resolution No. 018-16 and 019-16. At the time this EIR was published for public review, the City was in the process of updating its Bakersfield 2045 General Plan, but it has not yet been adopted. The General Plan includes goals, policies, and directions to achieve the City’s vision of the community and future development. The General Plan includes 12 elements that focus on: Land Use; Circulation; Housing; Conservation; Open Space; Noise; Safety; Downtown Redevelopment; Public Services Facilities; Parks; Kern River Plan; and Historical Resources.
The General Plan is a policy document with land use maps and related information. It is designed to give long-range guidance to City staff and officials who make decisions that affect growth and resources in the metropolitan Bakersfield planning area. The General Plan helps to ensure that day-to-day decisions conform to the long-range program, which was designed to protect and Riverview Marketplace Commercial Project
Environmental Impact Report 4.1 Aesthetics
City of Bakersfield – SCH No. 2025101507 4.1-2
further the public interest as it relates to the City’s growth and development and mitigate environmental impacts.
The General Plan also serves as a guide to the private sector regarding the economy so that development initiatives conform to the City’s public plans, objectives, and policies. Information in the Land Use Element, Circulation Element, and Public Services and Facilities Element is relevant to the topic of aesthetics. Land Use Element goals and policies focus on establishing a built environment that achieves a compatible functional and visual relationship among individual buildings and sites, encourages high-quality design and landscaping, minimizes light pollution, and requires that new large retail commercial development projects be evaluated for potential urban decay impacts. The Circulation Element discusses providing and maintaining landscaping on both sides and in the median of arterial streets and on both sides of collector streets. The Public Services and Facilities Element states that street lighting should be installed in all new developments in accordance with adopted city standards and county policies. Goals and policies contained in the Public Services and Facilities Element that are applicable to the proposed Project include the following:
Land Use Element
LAND/CD-P-8. Require that commercial development provide design features such as screen walls, landscaping and height, setback and lighting restrictions between the boundaries of adjacent residential land use designations so as to reduce impacts on residences due to noise, traffic, parking, and differences in scale.
LAND/CD-P-25 Provide for infill of commercial land uses to be compatible with the scale and character of existing commercial districts and corridors.
LAND/CD-P-26 Encourage adjacent commercial uses to be of compatible height, setback, color and materials.
LAND/CD-P-28 Require that commercial development provide design features such as screen walls, landscaping and height, setback and lighting restrictions between the boundaries of adjacent residential land use designations so as to reduce impacts on residences due to noise, traffic, parking, and differences in scale.
LAND/CD-P-30 Street frontages along all new commercial development shall be landscaped.
LAND/CD-P-30.A Require new large retail commercial development projects to evaluate decay impacts on existing commercial uses as set forth in the implementation measures.
Public Services and Facilities Element
PS/SL-G-1 Provide uniform and adequate public lighting for all development and developing portions of the planning area.
PS/SL-P-4 Require developers to install street lighting in all new developments in accordance with adopted city standards and county policies.
Riverview Marketplace Commercial Project
Environmental Impact Report 4.1 Aesthetics
City of Bakersfield – SCH No. 2025101507 4.1-3
Circulation Element
CIRC/IMAGE 18: Provide and maintain landscaping on both sides and in the median of arterial streets within incorporated areas. In unincorporated areas, landscaping within road right-of-way may be allowed and shall be limited to low shrubs; blank irrigation conduit only will be provided within the median of arterial streets.
City of Bakersfield Municipal Code
The Municipal Code addresses specific issues regarding scenic and hillside areas, streetlights, parking lot lighting, lighting design and lighting for new development. Municipal codes that relate to the proposed Project include the following:
Section 17.08.140.G. Pedestrian Circulation.
1. For projects exceeding fifty thousand square feet of gross floor area, and/or five acres of net buildable area, meandering sidewalks at least six feet in width shall be provided along all sides of the retail development that abuts a local public street, and meandering sidewalks at least eight feet in width shall be provided along all sides of the retail development that abuts a collector or arterial public street.
Chapter 17.58 (Parking and Loading Standards). Chapter 17.58 establishes parking requirements and design standards for all development. Section 17.58.060 addresses parking lot lighting, requiring that lighting be designed to prevent glare and light spillover onto adjacent properties through the use of shields, baffles, and appropriate fixture selection.
Chapter 17.60 (Signs). Chapter 17.60 regulates signs and sign illumination. Section 17.60.060 places restrictions on floodlighting, neon tubing, exposed bulbs, flashing signs, and changeable copy signs. The section requires that illuminated signs be designed with shielded light sources directed away from streets, adjacent properties, and residential areas to prevent hazards and nuisances.
Chapter 17.61 (Landscaping). Chapter 17.61 establishes landscaping requirements for development projects, including requirements for drought-tolerant plants, parking lot shading, perimeter landscaping, and street frontage landscaping. The standards are designed to enhance visual quality, provide shade, and ensure compatibility with surrounding uses.
Chapter 17.71 (Outdoor Lighting). Chapter 17.71 establishes outdoor lighting standards for all development to promote safety, energy efficiency, and protection of the community’s night sky environment. The ordinance sets standards for placement, design, shielding, and intensity of outdoor lights to minimize glare, light trespass, and excessive illumination.
Section 17.71.030 (Lighting). Section 17.71.030 addresses light trespass, prohibiting illumination levels that extend beyond property boundaries and requiring that all outdoor lighting be designed and installed to prevent light from spilling onto adjacent properties or into the night sky. Light trespass to residentially zoned or designated properties is limited to a maximum intensity of 0.5 foot-candles at the property line, measured three feet above finished grade. This quantitative threshold provides an objective standard for evaluating light spillover impacts. Fixtures must be fully shielded or directed downward to confine light within the intended area.
Section 9.22.050 (Construction Hours). Section 9.22.050 regulates construction activities to minimize impacts on residential areas. Construction, including operation of Riverview Marketplace Commercial Project
Environmental Impact Report 4.1 Aesthetics
City of Bakersfield – SCH No. 2025101507 4.1-4
tools or equipment used in construction, drilling, repair, alteration, or demolition work, is permitted between:
▪ Monday through Friday: 6:00 AM to 9:00 PM
▪ Saturday, Sunday, and holidays: 8:00 AM to 9:00 PM
These restrictions ensure that construction activities occur during daytime hours when aesthetic impacts (primarily related to nighttime lighting) are avoided.
4.1.2 Environmental Setting
As described in Chapter 2, Project Description, of this Draft EIR, the Project Site is located on a portion of a larger property formerly occupied by the Pacific Gas & Electric (PG&E) Kern Power Plant. The Project Site is currently secured on all sides by six-foot-tall chain-link fencing, with vehicular access provided via gated unpaved entry drives along Coffee Frontage Road and one concrete paved driveway along Rosedale Highway. Both Coffee Road and Rosedale Highway are improved with concrete curb and gutters, yet only Rosedale Highway is fully developed with a concrete sidewalk. A portion of Coffee Road is improved with a concrete sidewalk. Existing onsite features include abandoned oil wells; electrical transmission lines on metal poles, towers, and wooden poles; and several dirt roads and mounds.
Figure 4.1-1: Photos of the Project Site from Coffee Road, Figure 4.1-2: Photo of the Project Site from Rosedale Highway viewing southwest and Figure 4.1-3: Photo of the Project Site from El Toro Viejo Road viewing northeast depict views of the Project Site from surrounding streets.
FIGURE 4.1-1: Photos of the Project Site from Coffee Road
RIVERVIEW MARKETPLACE COMMERCIAL PROJECT
Viewing west
Viewing northwest
1 efity
_cuor
— n cP 5
—
fr '
■ - - the
. —
r
F £
- [ i
rerperrew
an es — , • ■ lr
mnudih 2 5
eh ae
... ‘no- jsealleT
wea"
&
: emi ■- and ■ ■ ’
shicsnte
KimleyHorn
t
s a
L == — : "
Riverview Marketplace Commercial Project
Environmental Impact Report 4.1 Aesthetics
City of Bakersfield – SCH No. 2025101507 4.1-6
This page intentionally left blank.
FIGURE 4.1-2: Photo of the Project Site from Rosedale Highway viewing southwest
RIVERVIEW MARKETPLACE COMMERCIAL PROJECT
R.ne
—e
-
aen, Ji )
/
<
p
11 । 51 A
aLHI
III
-
haeCr r u _ dke o -
- ■
e.
— wn
NW
■ws ..
. 1
- < weseshg
R ■
WW
A
w Jl
ullun
KimleyHorn
i
wttns MV
«1W98or 1
GarrelTuckness j 661 631 3811 1
J. Woods. I
j 661 6313907 I
Garret fockness
! 661 613411 I
a
"Ted
1»
4 -pgr
===== 1
ite : -----
R.
Riverview Marketplace Commercial Project
Environmental Impact Report 4.1 Aesthetics
City of Bakersfield – SCH No. 2025101507 4.1-8
This page intentionally left blank.
FIGURE 4.1-3: Photo of the Project Site from El Toro Viejo Road viewing northeast
RIVERVIEW MARKETPLACE COMMERCIAL PROJECT
i
E ’ I il..-
mpeu
.1' Wpmmppn “I I l
wtEb ft Jail Emi 1
e
/
_ -
ne
, < ft peogte V y VO07
A
■ a ng 9
: ht * ' (hatt ss -
yt cld1 X* < YI ft' see (
T . I . y 25), tore ter \ AAAwM ■
Ar — -. 4 — \ \
2 ylon.
Ege. -
l
hiatielui
KimleyHorn
WK -
Maa _Aatst
1-- a)
s
..
■
o
10"
Wale de iesol" Bel
5 —h J ' ;
J i, 2
, 7 374 —
“N Pel 1 " use vels
fhple
ewe
-y 7
5 — mornj, wECwel I' H^V ACahae A. 7
at
0 ...
wlliin —h
Pta
I \
"u.
Amoy g " Lo
t
VPWol, eurne dak : s Nk A ■' aEndR 22
Ww
..
e
a-eruti
. , '• lwd 5 .
Riverview Marketplace Commercial Project
Environmental Impact Report 4.1 Aesthetics
City of Bakersfield – SCH No. 2025101507 4.1-10
This page intentionally left blank.
Riverview Marketplace Commercial Project
Environmental Impact Report 4.1 Aesthetics
City of Bakersfield – SCH No. 2025101507 4.1-11
Nearby uses include Rosedale Highway and a commercial retail center (Northwest Promenade), to the north; a PG&E electric substation and vacant land to the south; El Toro Viejo Road, commercial retail, and a PG&E electric substation to the west; and Coffee Road, Friant-Kern Canal, and a commercial retail center to the east.
The Golden Empire Transit (GET) District is the main transit agency servicing the City. Currently, GET operates buses on the following three (3) routes within the vicinity of the Project: Route 61, Route 82, and Route 84. Nearby pedestrian facilities include sidewalks along both sides of Rosedale Highway, both sides of Coffee Road north of Jet Way and the west side of Coffee Road south of Jet Way. Pedestrian crosswalks are provided at signalized intersections along Rosedale Highway and Coffee Road. Existing Class II Bike Lanes are provided in both directions along Rosedale Highway and Coffee Road
The General Plan land use designation of the Project Site is P (Public Facilities). The Project Site is zoned M-2 (General Manufacturing). The Project applicant is seeking an amendment to the City’s General Plan, changing the Project Site’s designation from P (Public Facilities) to LI (Light Industrial), to facilitate the Project Site’s proposed use and create alignment with the Project Site’s M-2 zoning designation, which under the City’s stacked zoning code allows, by right, all uses are permitted under the commercial designations. Therefore, to proceed with the Project and its proposed uses and to provide consistency with the Project site’s M-2 zoning designation, the LI designation has been determined to be the appropriate land use designation.
4.1.3 Impact Analysis
Methodology
The following thresholds of significance are based on the Environmental Checklist contained in Appendix G of the CEQA Guidelines. The effects of the Project on aesthetics were qualitatively assessed. The effects of the proposed Project were considered in relation to existing aesthetic resources in the Project area, including scenic vistas and the architecture of surrounding buildings.
Thresholds of Significance
The City utilizes the California Environmental Quality Act (CEQA) Guidelines, Appendix G, and thresholds of significance1to analyze the environmental impacts of the Project. Per CEQA Guidelines, an impact is considered significant if the Project would:
• Have a substantial adverse effect on a scenic vista.
• Substantially damage scenic resources, including, but not limited to, trees, rock outcroppings, and historic buildings within a state scenic highway. • In nonurbanized areas, substantially degrade the existing visual character or quality of public views of the site and its surroundings. (Public views are those that are experienced from publicly accessible vantage point). In an urbanized area, the project would conflict with applicable zoning and other regulations governing scenic quality. 1 Association of Environmental Professionals (AEP). 2025. CEQA Guidelines Appendices, Appendix G: Environmental Checklist Form. Available at: https://www.califaep.org/docs/CEQA_Handbook_2025combined.pdf. Accessed January 2026.
Riverview Marketplace Commercial Project
Environmental Impact Report 4.1 Aesthetics
City of Bakersfield – SCH No. 2025101507 4.1-12
• Create a new source of substantial light or glare which would adversely affect day or nighttime views in the area.
Project Impacts
Threshold AES-1: Would the project have a substantial adverse effect on a scenic vista? Impact Analysis
A scenic vista is considered a view that has remarkable or unique scenery or resources that are indigenous to a specific area. The Project Site is largely undeveloped and onsite features include abandoned oil wells; electrical transmission lines on metal poles, towers, and wooden poles; and several dirt roads and mounds. The Project does not contain any special or unique scenic attributes, like rock outcroppings, native vegetation, or a substantial number of mature trees.
The Project Site is not located in an area designated as scenic in the Metropolitan Bakersfield General Plan, it is not within the City’s Hillside Development Combining Zone and is not within a City-designated Class I or II Visual Resource Area, Viewshed, or Slope Protection Area. The Project is not situated in one of the areas the City has recognized as featuring scenic vistas or along a scenic route as identified in the City’s General Plan. Accordingly, the Project would not block a view corridor of a scenic resource.
The construction of commercial uses at the Project Site would be in character and compatible with existing urban land uses in the vicinity of the Project Site and is a natural extension of the urban growth occurring in the Project area. The Project, once developed, would improve the visual conditions on the Project Site. The Project would have a contemporary architectural design with articulated facades. (See Figure 5: Renderings). Building materials would include but not be limited to cement plaster with stone veneer, aluminum wood siding metal canopies, and large display windows. Careful and judicial use of landmark buildings, as well as signage, distinctive landscape palettes, and other such elements would provide an identity and cohesiveness to the Project Site. Along the Coffee Road frontage and Rosedale Highway frontages would run a “dry creek” feature composed of decorative cobbles, decomposed granite and crushed rocks. The Project would feature new landscaping along the entire site perimeter and internal to the Project Site. Landscaping would include a variety of ornamental trees, shrubs, and groundcover that would help soften the massing of the buildings, provide for a pedestrian oriented experience, and provide shade. Therefore, the Project would not have a substantial adverse effect on a scenic vista, and impacts are less than significant.
Mitigation Measures
None required.
Level of Significance After Mitigation
Less than significant with no mitigation required.
Riverview Marketplace Commercial Project
Environmental Impact Report 4.1 Aesthetics
City of Bakersfield – SCH No. 2025101507 4.1-13
Threshold AES-2: Would the project substantially damage scenic resources, including, but not limited to, trees, rock outcroppings, and historic buildings within a state scenic highway?
Impact Analysis
The Project Site is located within an urban area, surrounded by existing development. According to the Caltrans California State Scenic Highway System Map, the Project Site is not located within a scenic highway. The nearest eligible State scenic highway in Kern County is the Cuyama Highway State Route 166 (SR 166) located approximately 40-miles southwest of the Project Site.
Thus, implementation of the Project would result in no impacts associated with views from a State scenic highway. No impact would occur.
Mitigation Measures
None required.
Level of Significance After Mitigation
No impact and no mitigation required.
Threshold AES-3: Would the project, if in nonurbanized areas, substantially degrade the existing visual character or quality of public views of the site and its surroundings? (Public views are those that are experienced from publicly accessible vantage point). If the project is in an urbanized area, would the project conflict with applicable zoning and other regulations governing scenic quality?
Impact Analysis
Because the Project site is located in an “urbanized area” and is planned for urban uses by the City’s General Plan, this evaluation focuses on the Project’s compatibility with or potential conflict with applicable policies and regulations contained in the Metropolitan Bakersfield General Plan and Municipal Code. As discussed in Table 4.11-1, General Plan Consistency within EIR Section 4.11, Land Use and Planning, the Project would be consistent with the goals and policies of the General Plan as it related to new commercial development. The Project proposes to transform an underutilized site into an active infill commercial center that would provide a visual improvement to the Project Site compared to existing conditions. The Project would have a contemporary architectural design with articulated facades. Buildings would have a maximum height of 90 feet (60 feet below the maximum building height for the M-2 zoning district). Building materials would include but not be limited to cement plaster with stone veneer, aluminum wood siding metal canopies, and large display windows. Use of landmark buildings, as well as signage, distinctive landscape palettes, and other such elements would provide an identity and cohesiveness to the Project Site.
Landscaping would include a variety of ornamental trees, shrubs, and groundcover that would help soften the massing of the buildings, provide for a pedestrian oriented experience and provide shade. The Project would also include enhanced paving areas within small plaza areas, in front of storefronts and enhanced vehicle paving at entry points. Along the Coffee Road Frontage and Rosedale Highway frontages would run a “dry creek” feature composed of decorative cobbles and decomposed granite and crushed rocks.
Riverview Marketplace Commercial Project
Environmental Impact Report 4.1 Aesthetics
City of Bakersfield – SCH No. 2025101507 4.1-14
The Project would feature 325,120 square feet of new landscaping along the entire site perimeter and internal to the Project Site. Landscaping would include a variety of ornamental trees, shrubs, and groundcover that would help soften the massing of the buildings, provide for a pedestrian oriented experience and provide shade. Within the parking lot area would be 443 trees and The Project would include 122 street trees (79 trees provided on Coffee Road and 43 on Rosedale Highway) plus 534 trees in within the Project Site for a total of 656 trees. Types of trees would include Marina Strawberry tree, Western Redbud, Chinese Flame tree, Canary Island Pine, California Sycamore, Coast Live Oak, Holly Oak, Cork Oak, Interior Live Oak, Brisbane Box, Chinese Elm, and Majestic Beauty Indian Hawthorn. The Project’s landscape plan complies with BMC Chapter 17.61, including drought-tolerant plant selection.
Accordingly, the Project, would comply with the applicable zoning requirements pertaining to scenic quality and impacts would be less than significant.
Mitigation Measures
None required.
Level of Significance After Mitigation
Less than significant with no mitigation required.
Threshold AES-4: Would the project create a new source of substantial light or glare which would adversely affect day or nighttime views in the area? Impact Analysis
The Project Site is located in an urbanized area of the City, which includes nighttime lighting associated with the surrounding land uses. This includes street lighting, parking lot lighting, and lights from vehicles. Nearby light sensitive receptors consist of residential developments to the west, southwest, and north of the Project Site.
Construction activities would be limited to daytime hours per BMC Section 9.22.050: 6:00 AM to 9:00 PM Monday through Friday, and 8:00 AM to 9:00 PM on weekends and holidays.
Construction activities would not require nighttime illumination. Daytime construction equipment may produce temporary glare from metal surfaces; however, these effects would be short-term, intermittent, localized to the Project Site, and typical of construction activities in urbanized areas.
As construction would not occur outside permitted hours and would not require nighttime lighting, construction-related light and glare impacts would be less than significant.
Operational lighting for the Project is intended to minimize light trespass and glare from the Project Site onto adjacent properties and to provide safety and nighttime visibility through shielded, focused, and directed illumination. Lighting would consist of exterior building-mounted light fixtures; interior lighting for the new building; lighting for pedestrian walkways and common gathering areas; lighting for the green spaces; ground-mounted decorative lighting for landscape and architectural features; signage lighting; lighting for the new parking areas, drive aisles, and loading dock areas; and security lighting.
The Project is anticipated to require a number of sign types that would help identify and promote the Project and its businesses and tenants. Sign types would include multi-tenant pylon and monument signs, project identification monument signs, tenant wall signs, and onsite directional and legal signs.
Riverview Marketplace Commercial Project
Environmental Impact Report 4.1 Aesthetics
City of Bakersfield – SCH No. 2025101507 4.1-15
All new light sources associated with the Project would be required to comply with the Bakersfield Municipal Code for exterior lighting standards, which prevent light spillover, glare, nuisance, inconvenience, or hazardous interference of any kind on adjacent properties and streets.
Mandatory compliance with the Bakersfield Municipal Code would ensure that the Project’s light fixtures and signage would not introduce any design features that would cause artificial light or glare to an extent that would adversely affect day or nighttime views in the area. Thus, potential lighting and glare impacts would be less than significant.
Mitigation Measures
None required.
Level of Significance After Mitigation
Less than significant with no mitigation required.
Cumulative Impacts
Impact Analysis
Potential cumulative impacts would occur if the Project, in combination with the identified cumulative projects, would result in significant effects to aesthetics. For purposes of this analysis, the geographic scope would be the viewshed or area surrounding the Project site within view of surrounding observers.
As discussed in Table 4.11-1, General Plan Consistency within EIR Section 4.11, Land Use and Planning, the Project would be consistent with the goals and policies of the General Plan as it related to new commercial development. The Project proposes to transform an underutilized site into an active infill commercial center that would provide a visual improvement to the Project Site compared to existing conditions. The Project would have a contemporary architectural design with articulated facades. Buildings would have a maximum height of 90 feet (60 feet below the maximum building height for the M-2 zoning district). Building materials would include, but not be limited to, cement plaster with stone veneer, aluminum wood siding, metal canopies, and large display windows. Use of landmark buildings, as well as signage, distinctive landscape palettes, and other such elements would provide an identity and cohesiveness to the Project Site.
The Project would be consistent with the height and uses of nearby development. In addition, the Project is not near a scenic highway. Furthermore, the Project would comply with the applicable zoning requirements pertaining to scenic quality. The Project would not impact scenic vistas, scenic resources, nor would result in degradation of the existing scenic quality or character of the surrounding area. The Project would introduce additional nighttime lighting; however, the proposed light sources would be consistent with existing regulations pertaining to lighting and signage. Regardless, as none of the cumulative projects are located within the viewshed of the Project there would be no cumulative impacts to aesthetic resources.
Mitigation Measures
No mitigation measures are required as impacts would be less than significant.
Level of Significance After Mitigation
Not applicable. Project-specific impacts would be less than significant and there would be no cumulative impacts related to aesthetics.
Riverview Marketplace Commercial Project
Environmental Impact Report 4.1 Aesthetics
City of Bakersfield – SCH No. 2025101507 4.1-16
This page intentionally left blank.
City of Bakersfield – SCH No. 2025101507 4.2-1
4.2 Agriculture and Forestry Resources
This section discusses impacts associated with the potential for the proposed Riverview Marketplace Commercial Project (Project) to degrade or result in the loss of existing agricultural uses, forest land, or timberland. Potential effects are evaluated relative to the Project’s potential to convert Prime Farmland, Unique Farmland, or Farmland of Statewide Importance for non-agricultural use; conflict with existing zoning for agricultural use, or a Williamson Act Contract; conflict with existing zoning for, or cause rezoning of, forest land or timberland zoned Timberland Production; result in the loss of forest land or conversion of forest land to non-forest use; or involve other changes in the existing environment that, due to their location or nature, could result in conversion of farmland to non-agricultural use or conversion of forest land to non-forest use.
Information in this section is based, in part, on farmland and Williams Act mapping provided by the California Department of Conservation (DOC), the Metropolitan Bakersfield General Plan (General Plan), and the Bakersfield Municipal Code – Title 17 (Zoning Ordinance).
During the scoping period for the Project’s Environmental Impact Report (EIR), no comments were received in response to the Notice of Preparation (NOP) related to agriculture and forest resources.
4.2.1 Regulatory Setting
Federal
Farmland Protection and Policy Act
The Farmland Protection and Policy Act (FPPA) (7 United States Code [U.S.C.] § 4201 et seq.), was enacted in 1981 to minimize the loss of prime and unique farmlands due to federal actions converting these lands to nonagricultural uses. It ensures that federal programs are consistent with state, local, and private programs and policies to protect farmland.
State
Farmland Mapping and Monitoring Program
Pursuant to section 65570 of the Government Code, the DOC Farmland Mapping and Monitoring Program (FMMP) compiles important farmland maps for the state. These maps combine soil survey and current land use information to provide an inventory of agricultural resources in each county. These maps are based on data from the U.S. Department of Agriculture and Natural Resources Conservation Service. The maps show urbanized lands and a qualitative sequence of agricultural designations. County, state, and federal agencies have established the following classifications of important agricultural land based on factors such as soil characteristics, climate, and water supply:
• Prime Farmland. This land has the best combination of physical and chemical features and can sustain long-term agricultural production. The land has the soil quality, growing season, and moisture supply needed to produce sustained high yields, and it also must have been used for irrigated agricultural production at some time during the four years prior to the mapping date.
• Farmland of Statewide Importance. Similar to Prime Farmland but with minor shortcomings, such as greater slopes or less ability to store soil moisture. The land must Riverview Marketplace Commercial Project
Environmental Impact Report 4.2 Agriculture and Forestry Resources City of Bakersfield – SCH No. 2025101507 4.2-2
have been used for irrigated agricultural production at some time during the four years prior to the mapping date.
• Unique Farmland. This land has lesser-quality soils used for the production of the state’s leading agricultural crops. This land is usually irrigated but may include non-irrigated orchards or vineyards. Land must also have been cultivated at some time during the four years prior to the mapping date.
• Farmland of Local Importance. Land of importance to the local economy, as defined by each county’s local advisory committee and adopted by its board of supervisors. This refers to all farmable lands in the county that do not meet the definitions of Prime, Statewide Importance, or Unique farmland. This includes land that is or has been used for irrigated pasture, dryland farming, confined livestock and dairy, poultry facilities, aquaculture, and grazing land.
• Grazing Land. This land has existing vegetation that is suited to livestock grazing. This category was developed in cooperation with the California Cattlemen’s Association, University of California Cooperative Extension, and other groups interested in the extent of grazing activities. The minimum mapping unit for Grazing Land is 40 acres. • Urban and Built-Up Land. This land is occupied by structures with a building density of at least one unit to 1.5 acres, or approximately six structures to a 10-acre parcel. This land is used for residential, industrial, commercial, construction, institutional, public administration, railroad, and other transportation yards, cemeteries, airports, golf courses, sanitary landfills, sewage treatment, water control structures, and other developed purposes.
• Semi-Agricultural and Rural Commercial Land. This land includes farmsteads, agricultural storage and packing sheds, unpaved parking areas, composting facilities, equine facilities, firewood lots, and campgrounds.
• Other Land. This land is not included in any other mapping category. Common examples of this type of land include low-density rural developments; brush, timber, wetland, and riparian areas not suitable for livestock grazing; confined livestock, poultry, or aquaculture facilities; strip mines or borrow pits; and water bodies smaller than 40 acres. Vacant and nonagricultural land greater than 40 acres and surrounded on all sides by urban development is mapped as Other Land.
Note that CEQA analysis focuses on impacts to three categories of mapped farmland - Prime Farmland, Farmland of Statewide Importance, and Unique Farmland. In this section, the term “mapped important farmland” refers to these three categories of farmland combined.
California Land Conservation Act (Williamson Act)
The California Land Conservation Act, or Williamson Act, (Gov Code §§ 51200 et seq.) was adopted in 1965. The Act was established to encourage the preservation of agricultural lands in view of the increasing trend toward their “premature and unnecessary” urbanization. The Act enables counties and cities to designate agricultural preserves (Williamson Act lands) and offer preferential taxation to agricultural landowners based on the land’s income-producing value. In return for the preferential tax rate, the landowner is required to sign a contract (Williamson contract) with the applicable county or city agreeing not to develop the land for a minimum of 10 years. The contract is renewed automatically on its anniversary date unless a notice of nonrenewal or petition for cancellation is filed. Any land held in a Williamson Act contract will have Riverview Marketplace Commercial Project
Environmental Impact Report 4.2 Agriculture and Forestry Resources City of Bakersfield – SCH No. 2025101507 4.2-3
to be filed for nonrenewal and the contract will have to be allowed to expire before any development occurs on it.
Local
Metropolitan Bakersfield General Plan
The General Plan, Metropolitan Bakersfield General Plan, dated December 2002, was updated in January 2016 per Resolution No. 018-16 and 019-16. At the time this EIR was published for public review, the City was in the process of updating its General Plan, but it had not yet been adopted. The General Plan includes goals, policies, and directions to achieve the City’s vision of the community and future development. The General Plan includes 12 elements that focus on:
Land Use; Circulation; Housing; Conservation; Noise; Safety; Downtown Redevelopment; Public Services Facilities; Parks; Kern River Plan; Open Space; and Historical Resources.
The General Plan established the following goal and , policies in order to protect the City’s agriculture and forestry resources.
Land Use Element
LU/G-P-77 Allow for the continuance of agricultural uses in area designated for future urban growth (I-1).
LU/G-P-80 Assure that General Plan Amendment proposals for the conversion of designated agricultural lands to urban development occur in an orderly and logical manner giving full consideration to the effect on existing agricultural areas (I-15).
Conservation Element
CON/SA-G-1 Provide for the planned management, conservation, and wise utilization of agricultural land in the planning area.
CON/SA-G-2 Promote soil conservation and minimize development of prime agricultural land as defined by the following criteria:
• Capability Class I and/or II irrigated soils
• 80-100 Storie Index rating
• Gross crop return of $200 or more per acre per year
• Annual carrying capacity of 1 animal unit per acre per year CON/SA-G-3 Establish urban development patterns and practices that promote soil conservation and that protected areas of agricultural production of food and fiber crops, and nursery products.
CON/SA-P-1 Determine the extent and location of all prime agricultural land within the study area (I-1).
CON/SA-P-2 Review projects that propose subdividing or urbanizing prime agricultural land to ascertain how continued commercial agricultural production in the project vicinity will be affected (I-2).
CON/SA-P-3 Protected areas designated for agricultural use, which include Class I and II agricultural soils having surface delivery water Riverview Marketplace Commercial Project
Environmental Impact Report 4.2 Agriculture and Forestry Resources City of Bakersfield – SCH No. 2025101507 4.2-4
systems, from the encroachment or resident and commercial subdivision activities (I-2).
CON/SA-P-4 Monitor the amount of prime agricultural land taken out of production for urban uses or added within the plan area (1-3).
CON/SA-P-8 Encourage agricultural uses to employ soil conservation measures to prevent erosion (1-4, 1-7).
CON/SA-P-9 Protect prime agricultural lands against unplanned urban development by adopting agricultural zoning, agricultural land use designations, and by encouraging use of the Williamson Act and the Farmland Security Zone Program and policies that provide tax and economic incentives to ensure the long-term retention of agricultural lands (1-5).
CON/SA-P-10 Encourage landowners to retain their lands in agricultural production (1-6).
CON/SA-P-14 When considering proposals to convert designated agricultural lands to nonagricultural use, the decision-making body of the City and County shall evaluate the following factors to determine the appropriateness of the proposal:
• Soil quality
• Availability of irrigation water
• Proximity to non-agricultural uses
• Proximity to intensive parcelization
• Effect on properties subject to "Williamson Act" land use contracts. • Ability to be provided with urban services (sewer, water, roads, etc.) • Ability to affect the application of agricultural chemicals on nearby agricultural properties • Ability to create a precedent-setting situation that leads to the premature conversion of prime agricultural lands
• Demonstrated project need
• Necessity of buffers such as lower densities, setbacks, etc. (1-8) CON/AQ-G-4 Reduce air pollution associated with agricultural activities.
City of Bakersfield Land Use Zoning Ordinance
The City’s Zoning Ordinance is included in Title 17 of the Bakersfield Municipal Code. The Zoning Ordinance implements the goals and policies of the General Plan, which serve to promote and protect the public health, safety, peace, morals, comfort, convenience and general welfare. The Zoning Ordinance assists in providing a definite plan of development for the City and to guide, control and regulate the future growth of the city in accordance with the General Plan. The Zoning Ordinance also is intended to protect the established character and the social and economic Riverview Marketplace Commercial Project
Environmental Impact Report 4.2 Agriculture and Forestry Resources City of Bakersfield – SCH No. 2025101507 4.2-5
stability of agricultural, residential, commercial, industrial and other areas within the city, and to assure the orderly and beneficial development of such areas.
4.2.2 Environmental Setting
As described in Chapter 2, Project Description, the Project Site is located in the northwestern portion of the City of Bakersfield. The approximately 46.16 acre Project site, which consists of one legal parcel (APN 368-010-05) and is an undeveloped L-shaped property situated along the south side of Rosedale Highway, north of railroad tracks, west of Coffee Road, and east of El Toro Viejo Road. The Project Site is located on a portion of a larger property formerly occupied by the PG&E Kern Power Plant. Existing on-site features include abandoned oil wells; electrical transmission lines on metal poles, towers, and wooden poles; and several dirt roads and mounds.
Development of the Project site would include construction and operation of a commercial retail center that would encompass approximately 405,531 square feet of total building space. The specific businesses and/or tenants that would ultimately occupy each of the buildings are not fully known at this time. However, it is assumed that larger interior anchor buildings within the Project Site, would be occupied by markets, retail uses, storage uses, and a health club. The outer building pads would be occupied by smaller retail tenants, a medical office, drive-thrus, fast casual and sit-down restaurants, a car wash, and a gas station with 20 dual-sided pumps.
The General Plan designates the Project Site as P (Public Facilities), and the Zoning Ordinance zones the Project Site as M-2 (General Manufacturing). The Project would include an amendment to the City’s General Plan, changing the Project Site’s designation from P to LI (Light Industrial), to facilitate the Project Site’s proposed use and create alignment with the Project Site’s M-2 zoning designation, which, under the City’s stacked zoning code, allows, by right, all uses permitted under the C-O (Professional and Administrative Office), C-1 (Neighborhood Commercial) and C-2 (Regional Commercial) zones. Therefore, the LI designation has been determined to be the appropriate land use designation.
The DOC FMMP prepares and maintains Important Farmland Series Maps, including the California Important Farmland Finder. As discussed under Section 4.2.1, Regulatory Setting, agricultural land is rated according to soil quality and irrigation status, where the best quality land is designated as Prime Farmland. In preparing these maps, the DOC considers all information collected or received on the amount of land converted to or from agricultural use, and between agricultural categories. According to the California Important Farmland Finder, the Project Site consists of land designated as “Vacant and Disturbed Land.” 1 The Project Site is generally
surrounded by land designated as “Vacant and Disturbed Land” as well as “Urban and Built-Up Land.” A parcel directly west of the Project Site contains land designated as “Semi-agricultural and Rural Commercial Land,” and a parcel directly south of the BNSF railroad is designated as “Grazing Land.” The closest protected farmland to the Project Site is an approximately 14-acre site designated as “Prime Farmland,” located approximately 1.75 miles southwest of the Project, separated by “Urban and Built-Up Land.” Notably, a large area of “Prime Farmland” and “Farmland of Statewide Importance” is located approximately 3.4 miles northwest of the Project Site, where the urban uses associated with the City of Bakersfield terminates.2 1 California Department of Conservation (DOC). 2022. California Important Farmland Finder. Available at:
https://maps.conservation.ca.gov/dlrp/ciff/. Accessed January 2026. 2 California Department of Conservation (DOC). 2022. California Important Farmland Finder. Available at:
https://maps.conservation.ca.gov/dlrp/ciff/. Accessed January 2026.
Riverview Marketplace Commercial Project
Environmental Impact Report 4.2 Agriculture and Forestry Resources City of Bakersfield – SCH No. 2025101507 4.2-6
4.2.3 Impact Analysis
Methodology
The effects of the Project on agriculture and forestry resources were assessed qualitatively. The analysis included identifying farmlands and timberlands employing mapping applications made available to the public by the State and assessing the potential effects of the proposed Project on these resources.
Thresholds of Significance
The City utilizes the California Environmental Quality Act (CEQA) Guidelines, Appendix G, and thresholds of significance3to analyze the environmental impacts of the Project. Per CEQA Guidelines, an impact is considered significant if the Project would:
• Convert Prime Farmland, Unique Farmland, or Farmland of Statewide Importance (Farmland), as shown on the maps prepared pursuant to the Farmland Mapping and Monitoring Program of the California Resources Agency, to non-agricultural use. • Conflict with existing zoning for agricultural use, or a Williamson Act contract. • Conflict with existing zoning for, or cause rezoning of, forest land (as defined in Public Resources Code Section 12220(g)), timberland (as defined by Public Resources Code Section 4526), or timberland zoned Timberland Production (as defined by Government Code Section 51104(g)).
• Result in the loss of forest land or conversion of forest land to non-forest use. • Involve other changes in the existing environment which, due to their location or nature, could result in conversion of Farmland, to non-agricultural use or conversion of forest land to non-forest use.
Project Impacts
Threshold AG-1: Would the project convert Prime Farmland, Unique Farmland, or Farmland of Statewide Importance (Farmland), as shown on the maps prepared pursuant to the Farmland Mapping and Monitoring Program of the California Resources Agency, to non-agricultural use? Impact Analysis
Based on a review of the California Important Farmland Finder, neither the Project Site nor any adjacent land is designated as Prime Farmland, Unique Farmland, or Farmland of Statewide Importance. Instead, the Project Site and adjacent land are designated as “Vacant and Disturbed Land” and “Urban and Built-Up Land,” with the exception of an approximately 17-acre parcel of “Semi-Agricultural and Rural Commercial Land,” which is not considered protected farmland. As such, the Project would not convert any Prime Farmland, Unique Farmland, or Farmland of Statewide Importance to a non-agricultural use. Therefore, there would be no impact, and no mitigation would be required.
Mitigation Measures
3 Association of Environmental Professionals (AEP). 2025. CEQA Guidelines Appendices, Appendix G: Environmental Checklist Form. Available at: https://www.califaep.org/docs/CEQA_Handbook_2025combined.pdf. Accessed January 2026.
Riverview Marketplace Commercial Project
Environmental Impact Report 4.2 Agriculture and Forestry Resources City of Bakersfield – SCH No. 2025101507 4.2-7
None required.
Level of Significance After Mitigation
No impact and no mitigation required.
Threshold AG-2: Would the project conflict with existing zoning for agricultural use, or a Williamson Act contract?
Impact Analysis
The Project site is located within an urban area, surrounded by existing development, and is not currently in use for agricultural activities. As discussed above, the Project Site is zoned as M-2.
Its zoning district designation would not be modified as a result of the Project. Instead, the Project would require a General Plan Amendment (GPA) to change the land use designation to LI to align with its existing zoning. The M-2 zoning district permits a variety of manufacturing and production plants as well as all uses permitted under commercial designations.4 This zoning designation does not allow agricultural uses. Additionally, according to the DOC, the Project Site is not subject to a Williamson Act contract.
5 Therefore, the Project would not cause a conflict with existing zoning for agricultural use, or a Williamson Act contract, and there would be no impact, and no mitigation is required.
Mitigation Measures
None required.
Level of Significance After Mitigation
No impact and no mitigation required.
Threshold AG-3: Would the project conflict with existing zoning for, or cause rezoning of, forest land (as defined in Public Resources Code Section 12220(g)), timberland (as defined by Public Resources Code Section 4526), or timberland zoned Timberland Production (as defined by Government Code Section 51104(g))?
Impact Analysis
As discussed under Impact AG-2, the Project Site is zoned as M-2. No portion of the Project site is zoned for forest land, timberland, or timberland production. The Project proposes to redevelop a currently vacant and undeveloped site into a new approximately 405,351 square foot commercial retail center with associated internal vehicle and pedestrian circulation improvements; surface parking areas and drive aisles; landscaping, hardscaping, and green space; and utility improvements consistent with the existing zoning. Therefore, the Project would not cause the rezoning of forest land or timberland, and no impact would occur. As such, no mitigation is required.
4 City of Bakersfield. 2025. Municipal Code. Title 17, Zoning. Chapter 17.30, M-2 General Manufacturing Zone. Available at:
https://bakersfield.municipal.codes/Code/17.30. Accessed January 2026. 5 DOC. 2024. Williamson Act Enrollment Finder. Available at: https://maps.conservation.ca.gov/dlrp/WilliamsonAct/. Accessed January 2026.
Riverview Marketplace Commercial Project
Environmental Impact Report 4.2 Agriculture and Forestry Resources City of Bakersfield – SCH No. 2025101507 4.2-8
Mitigation Measures
None required.
Level of Significance After Mitigation
No impact and no mitigation required.
Threshold AG-4: Would the project result in the loss of forest land or conversion of forest land to non-forest use?
Impact Analysis
As stated in Impact AG-3, above, the Project Site is currently zoned M-2, located within an urbanized area and is surrounded by existing development, and consists of vacant and disturbed land. Neither the Project Site nor its surroundings are zoned for forest land. Therefore, the Project would have no impact to forest land and no mitigation is required.
Mitigation Measures
None required.
Level of Significance After Mitigation
No impact and no mitigation required.
Threshold AG-5: Would the project involve other changes in the existing environment which, due to their location or nature, could result in conversion of Farmland, to non-agricultural use or conversion of forest land to non-forest use? Impact Analysis
As stated in Impact AG-4 above, the Project Site is in an urbanized area of the City. Additionally, the site is identified as vacant and disturbed land and therefore does not support agricultural resources or operations or forest uses. The Project would not result in the conversion of designated farmland to non-agricultural uses or forest land to non-forestland. There are no agricultural resources or operations, including farmlands, within proximity of the Project Site. As discussed above, the closest parcel designated as “Prime Farmland” is located approximately
1.75 miles southwest of the Project Site with intervening “Urban and Built-Up Land.” As such, the Project would not impact this parcel such that the uses on the parcel would be impacted.
Therefore, no impacts would occur, and no mitigation is required.
Mitigation Measures
None required.
Level of Significance After Mitigation
No impact and no mitigation required.
Cumulative Impacts
Impact Analysis
As discussed in Section 4.2.2, Environmental Setting, excluding the small parcel of “Prime Farmland” located approximately 1.75 miles southwest of the Project Site, the Project is located Riverview Marketplace Commercial Project
Environmental Impact Report 4.2 Agriculture and Forestry Resources City of Bakersfield – SCH No. 2025101507 4.2-9
within an area of Bakersfield that is largely designated as “Urban and Built-Up Land” by the DOC.
As previously discussed, large portions of the protected farmland located at the western edge of the City’s “Urban and Built-Up Land,” is approximately 3.4 miles northwest of the Project Site.
Additionally, there are no areas designated as forest land or timberland in the surrounding areas.
Neither the Project nor the cumulative projects are located within a mile of these agricultural areas and would subsequently have no impacts associated with conversion of farmland, conflicts with zoning for agricultural or farmland uses, or result in loss or conversion of forest land or timberland.
Accordingly, there would be no cumulative impacts to these resources.
Mitigation Measures
No mitigation measures are required as the Project would have no direct or cumulative impacts.
Level of Significance After Mitigation
There would be no Project-specific or cumulative impacts related to agriculture, forestland, or timberland.
Riverview Marketplace Commercial Project
Environmental Impact Report 4.2 Agriculture and Forestry Resources City of Bakersfield – SCH No. 2025101507 4.2-10
This page intentionally left blank.
City of Bakersfield – SCH No. 2025101507 4.3-1
4.3 Air Quality
This section of the Draft EIR analyzes potential air quality impacts associated with the construction and operation of the Project. The information in this section is based on the detailed air quality analysis, Appendix B, Air Quality, Greenhouse Gas Emissions, and Energy Technical Study.
During the scoping period for the Project’s EIR, comments were received from the San Joaquin Valley Air Pollution Control District (District). These comments are included in Appendix A-2:
Notice of Preparation Comments, of this Draft EIR and are summarized below:
• Project Emissions: A more detailed preliminary review of the Project be conducted for the Project’s construction and operational emissions. The District recommends, to reduce impacts from construction-related diesel exhaust emissions, the Project should utilize the cleanest available off-road construction equipment. Operational (ongoing) air emissions from mobile sources and stationary sources should be analyzed separately. • An environmental review should adequately characterize and justify an appropriate trip length distance for off-site Heavy Heavy-Duty (HHD) truck travel to and from the Project site
• Emissions analysis should be performed using the California Emission Estimator Model (CalEEMod), which uses the most recent CARB-approved version of relevant emissions models and emission factors.
• Evaluate the risk associated with the Project for sensitive receptors (residences, businesses, hospitals, day-care facilities, health care facilities, etc.) in the area and mitigate any potentially significant risk to help limit exposure of sensitive receptors to emissions.
• An Ambient Air Quality Analysis (AAQA) uses air dispersion modeling to determine if emissions increases from a project will cause or contribute to a violation of State or National Ambient Air Quality Standards. The District recommends an AAQA be performed for the Project if emissions exceed 100 pounds per day of any pollutant. • A discussion on the feasibility of implementing a Voluntary Emission Reduction Agreement (VERA) is recommended.
• Evaluate HHD truck routing patterns for the Project, with the aim of limiting exposure of residential communities and sensitive receptors to emissions. • Use of cleanest available Heavy-Duty Trucks
• Ensure compliance of the state anti-idling regulation (13 CCR § 2485 and 13 CCR § 2480). • Under-fired charbroilers
• Vegetative barriers and urban greening
• Consider incorporating solar power systems as an emission reduction strategy for the Project.
• Electric Infrastructure
• Consider all available pertinent information to determine if the Project could have a significant impact related to nuisance odors
• District Rules and Regulations
Riverview Marketplace Commercial Project
Environmental Impact Report 4.3 Air Quality
City of Bakersfield – SCH No. 2025101507 4.3-2
4.3.1 Regulatory Setting
Federal and State
Ambient Air Quality Standards
The Clean Air Act (CAA) was passed in 1963 by the U.S. Congress and has been amended several times. The 1970 CAA amendments strengthened previous legislation and laid the foundation for the regulatory scheme of the 1970s and 1980s. In 1977, Congress again added several provisions, including nonattainment requirements for areas not meeting National Ambient Air Quality Standards (AAQS) and the Prevention of Significant Deterioration program. The 1990 amendments represent the latest in a series of federal efforts to regulate the protection of air quality in the United States. The CAA allows states to adopt more stringent standards or to include other pollution species. The California Clean Air Act, signed into law in 1988, requires all areas of the state to achieve and maintain the California AAQS by the earliest practical date. The California AAQS tend to be more restrictive than the National AAQS.
These National AAQS and California AAQS are the levels of air quality considered to provide a margin of safety in the protection of the public health and welfare. They are designed to protect “sensitive receptors” most susceptible to further respiratory distress, such as asthmatics, the elderly, very young children, people already weakened by other disease or illness, and persons engaged in strenuous work or exercise. Healthy adults can tolerate occasional exposure to air pollutant concentrations considerably above these minimum standards before adverse effects are observed.
Both California and the federal government have established health-based AAQS for seven air pollutants. As shown in Table 4.3-1, Ambient Air Quality Standards for Criteria Pollutants, these pollutants are ozone (O3), nitrogen dioxide (NO2), carbon monoxide (CO), sulfur dioxide (SO2), coarse inhalable particulate matter (PM10), fine inhalable particulate matter (PM2.5), and lead (Pb). In addition, the state has set standards for sulfates, hydrogen sulfide, vinyl chloride, and visibility-reducing particles. These standards are designed to protect the health and welfare of the populace with a reasonable margin of safety.
Table 4.3-1 Ambient Air Quality Standards for Criteria Pollutants Pollutant
Averaging
Time
California
Standard1
Federal
Primary
Standard2 Major Pollutant Sources
Ozone (O3)
3 1 hour 0.09 ppm * Motor vehicles, paints, coatings, and solvents. 8 hours 0.070 ppm 0.070 ppm
Carbon
Monoxide (CO)
1 hour 20 ppm 35 ppm Internal combustion engines, primarily gasoline-powered motor vehicles. 8 hours 9.0 ppm 9 ppm
Nitrogen
Dioxide (NO2)
Annual
Arithmetic Mean
0.030 ppm 0.053 ppm Motor vehicles, petroleum-refining operations, industrial sources, aircraft, ships, and railroads.
1 hour 0.18 ppm 0.100 ppm
Sulfur Dioxide
(SO2)
Annual
Arithmetic Mean
* 0.030 ppm Fuel combustion, chemical plants, sulfur recovery plants, and metal processing.
1 hour 0.25 ppm 0.075 ppm
24 hours 0.04 ppm 0.14 ppm
Riverview Marketplace Commercial Project
Environmental Impact Report 4.3 Air Quality
City of Bakersfield – SCH No. 2025101507 4.3-3
Pollutant
Averaging
Time
California
Standard1
Federal
Primary
Standard2 Major Pollutant Sources
Respirable
Coarse
Particulate
Matter
(PM10)
Annual
Arithmetic Mean
20 µg/m3* Dust and fume-producing construction, industrial, and agricultural operations, combustion,
atmospheric photochemical reactions, and natural
activities (e.g., wind-raised dust and ocean
sprays).
24 hours 50 µg/m3 150 µg/m3
Respirable
Fine
Particulate
Matter
(PM2.5)
4,6
Annual
Arithmetic Mean
12 µg/m3 9 µg/m3 Dust and fume-producing construction, industrial, and agricultural operations, combustion,
atmospheric photochemical reactions, and natural
activities (e.g., wind-raised dust and ocean
sprays).
24 hours * 35 µg/m3
Lead (Pb) 30-Day Average 1.5 µg/m3* Present source: lead smelters, battery manufacturing & recycling facilities. Past source:
Calendar Quarter combustion of leaded gasoline. * 1.5 µg/m3 Rolling 3-Month
Average
* 0.15
µg/m3
Sulfates (SO4)
5 24 hours 25 µg/m3
* Industrial processes.
Visibility
Reducing
Particles
8 hours ExCo
=0.23/km
visibility of
10≥ miles
* Visibility-reducing particles consist of suspended
particulate matter, which is a complex mixture of
tiny particles that consists of dry solid fragments,
solid cores with liquid coatings, and small droplets
of liquid. These particles vary greatly in shape,
size and chemical composition, and can be made
up of many different materials such as metals,
soot, soil, dust, and salt.
Hydrogen
Sulfide
1 hour 0.03 ppm * Hydrogen sulfide (H2S) is a colorless gas with the odor of rotten eggs. It is formed during bacterial
decomposition of sulfur-containing organic
substances. Also, it can be present in sewer gas
and some natural gas and can be emitted as the
result of geothermal energy exploitation.
Vinyl Chloride 24 hours 0.01 ppm * Vinyl chloride (chloroethene), a chlorinated hydrocarbon, is a colorless gas with a mild, sweet
odor. Most vinyl chloride is used to make polyvinyl
chloride (PVC) plastic and vinyl products. Vinyl
chloride has been detected near landfills, sewage
plants, and hazardous waste sites, due to
microbial breakdown of chlorinated solvents.
Source: CARB 2024.
Notes: ppm: parts per million; μg/m3: micrograms per cubic meter * Standard has not been established for this pollutant/duration by this entity. 1 California standards for O3, CO (except 8-hour Lake Tahoe), SO2 (1 and 24 hour), NO2, and particulate matter (PM10, PM2.5, and visibility reducing particles), are values that are not to be exceeded. All others are not to be equaled or exceeded. California ambient air quality standards are listed in the Table of Standards in Section 70200 of Title 17 of the California Code of Regulations. 2 National standards (other than O3, PM, and those based on annual arithmetic mean) are not to be exceeded more than once a year. The O3 standard is attained when the fourth highest 8-hour concentration measured at each site in a year, averaged over three years, is equal to or less than the standard. For PM10, the 24-hour standard is attained when the expected number of days per calendar year with a 24-hour average concentration above 150 µg/m3 is equal to or less than one. For PM2.5, the 24-hour standard is attained when 98 percent of the daily concentrations, averaged over three years, are equal to or less than the standard.
3 On October 1, 2015, the national 8-hour ozone primary and secondary standards were lowered from 0.075 to 0.070 ppm. 4 On December 14, 2012, the national annual PM2.5 primary standard was lowered from 15 μg/m3 to 12.0 µg/m3. The existing national 24-hour PM2.5 standards (primary and secondary) were retained at 35 µg/m3, as was the annual secondary standard of 15 µg/m3. The existing 24-hour PM10 standards (primary and secondary) of 150 µg/m3 also were retained. The form of the annual primary and secondary standards is the annual mean, averaged over 3 years.
5 On June 2, 2010, a new 1-hour SO2 standard was established, and the existing 24-hour and annual primary standards were revoked. The 1-hour national standard is in units of parts per billion (ppb). California standards are in units of parts per million (ppm). To directly compare the 1-hour national standard to the California standard the units can be converted to ppm. In this case, the national standard of 75 ppb is identical to 0.075 ppm. 6 On February 7, 2024, the national annual PM2.5 standard was lowered from 12 μg/m3 to 9 µg/m3. The existing national 24-hour PM2.5 standards (primary and secondary), secondary annual PM2.5 standard, and PM10 standards (primary and secondary) were retained.
Riverview Marketplace Commercial Project
Environmental Impact Report 4.3 Air Quality
City of Bakersfield – SCH No. 2025101507 4.3-4
California has also adopted a host of other regulations that reduce criteria pollutant emissions.
Assembly Bill (AB) 1493
Assembly Bill (AB) 1493, sometimes referred to as the “Pavley Bill,” established Fuel Efficiency Standards. Pavley I refers to clean-car standards that reduced greenhouse gas emissions from new passenger vehicles (light-duty auto to medium-duty vehicles) from 2009 through 2016. In January 2012, the California Air Resources Board (CARB) approved the Advanced Clean Cars program (formerly known as Pavley II) for model years 2017 through 2025.
Senate Bill (SB) 1078, SB 107, SB 350. SB 100, and SB 1020: Renewables Portfolio Standards.
A major component of California’s Renewable Energy Program is the renewables portfolio standard (RPS) established under SB 1078 (Sher) and SB 107 (Simitian). Under the RPS, certain retail sellers of electricity were required to increase the amount of renewable energy each year by at least 1 percent to reach at least 20 percent by December 30, 2010. Subsequent RPS requirements include a RPS of 40 percent by 2024 set under SB 350 and RPS requirements of 50 percent by 2026, 60 percent by 2030, and 100 percent by 2045 under SB 100. In addition, SB 1020 sets a RPS requirement of 90 percent by 2035 and 95 percent by 2040. Furthermore, SB 1020 also requires state agencies to procure 100 percent of electricity from renewable energy and zero-carbon resources by 2035.
Heavy-Duty (Tractor-Trailer) Greenhouse Gas Regulation. The owners of tractors and trailers subject to this regulation must either use EPA SmartWay-certified tractors and trailers or retrofit their existing fleet with SmartWay-verified technologies. The regulation applies primarily to owners of 53‐foot or longer box‐type trailers, including both dry‐van and refrigerated‐van trailers, and owners of the heavy‐duty tractors that pull them on California highways. These owners are responsible for replacing or retrofitting their affected vehicles with compliant aerodynamic technologies and low rolling resistance tires. Sleeper cab tractors model year 2011 and later must be SmartWay certified. All other tractors must use SmartWay-verified low-rolling-resistance tires.
There are also requirements for trailers to have low-rolling-resistance tires and aerodynamic devices.
California Code of Regulations (CCR), Title 20: Appliance Energy Efficiency Standards.
The 2006 Appliance Efficiency Regulations (20 CCR Sections 1601–1608) were adopted by the California Energy Commission on October 11, 2006, and approved by the California Office of Administrative Law on December 14, 2006. The regulations include standards for both federally regulated appliances and non–federally regulated appliances. 24 CCR, Part 6: Building and Energy Efficiency Standards.
Energy conservation standards for new residential and nonresidential buildings adopted by the California Energy Resources Conservation and Development Commission (now the California Energy Commission) in June 1977.
24 CCR, Part 11: Green Building Standards Code.
On July 17, 2008, the California Building Standards Commission adopted the nation’s first green building standards. The California Green Building Standards Code (24 CCR, Part 11), or “CALGreen,” was adopted as part of the California Building Standards Code. CALGreen established planning and design standards for sustainable site development, energy efficiency Riverview Marketplace Commercial Project
Environmental Impact Report 4.3 Air Quality
City of Bakersfield – SCH No. 2025101507 4.3-5
(in excess of the California Energy Code requirements), water conservation, material conservation, and internal air contaminants.1 The mandatory provisions of CALGreen became effective January 1, 2011, and were last updated in 2025. The 2025 CALGreen standards became effective January 1, 2026.
Tanner Air Toxics Act and Air Toxics Hot Spot Information and Assessment Act Public exposure to toxic air contaminants (TACs) is a significant environmental health issue in California. In 1983, the California legislature enacted a program to identify the health effects of TACs and reduce exposure to them. The California Health and Safety Code defines a TAC as “an air pollutant which may cause or contribute to an increase in mortality or in serious illness, or which may pose a present or potential hazard to human health” (Health and Safety Code Section 39655). A substance that is listed as a hazardous air pollutant pursuant to Section 112(b) of the federal Clean Air Act (42 US Code Section 112[b]) is a TAC. Under state law, the California Environmental Protection Agency, acting through CARB, is authorized to identify a substance as a TAC if it is an air pollutant that may cause or contribute to an increase in mortality or serious illness or may pose a present or potential hazard to human health.
California regulates TACs primarily through Assembly Bill (AB) 1807 (Tanner Air Toxics Act) and AB 2588 (Air Toxics “Hot Spot” Information and Assessment Act of 1987). The Tanner Air Toxics Act sets forth a formal procedure for CARB to designate substances as TACs. Once a TAC is identified, CARB adopts an “airborne toxic control measure” for sources that emit designated TACs. If there is a safe threshold for a substance (i.e., a point below which there is no toxic effect), the control measure must reduce exposure to below that threshold. If there is no safe threshold, the measure must incorporate toxic best available control technology to minimize emissions. To date, CARB has established formal control measures for 11 TACs that are identified as having no safe threshold.
Under AB 2588, TAC emissions from individual facilities are quantified and prioritized by the air quality management district or air pollution control district. High-priority facilities are required to perform a health risk assessment, and if specific thresholds are exceeded, they are required to communicate the results to the public through notices and public meetings.
CARB has promulgated the following specific rules to limit TAC emissions:
• 13 CCR Chapter 10 Section 2485: Airborne Toxic Control Measure to Limit Diesel-Fueled Commercial Motor Vehicle Idling. Generally, restricts on-road diesel-powered commercial motor vehicles with a gross vehicle weight rating of greater than 10,000 pounds from idling more than five minutes.
• 13 CCR Chapter 10 Section 2480: Airborne Toxic Control Measure to Limit School Bus Idling and Idling at Schools. Generally, restricts a school bus or transit bus from idling for more than five minutes when within 100 feet of a school. • 13 CCR Section 2477 and Article 8: Airborne Toxic Control Measure for In-Use Diesel-Fueled Transport Refrigeration Units (TRU) and TRU Generator Sets and Facilities Where TRUs Operate. Regulations established to control emissions associated with diesel-powered TRUs. 1 The green building standards became mandatory in the 2010 edition of the code.
Riverview Marketplace Commercial Project
Environmental Impact Report 4.3 Air Quality
City of Bakersfield – SCH No. 2025101507 4.3-6
AB 617, Community Air Protection Program
AB 617 (C. Garcia, Chapter 136, Statutes of 2017) requires local air districts to monitor and implement air pollution control strategies that reduce localized air pollution in communities that bear the greatest burdens. In response to AB 617, CARB has established the Community Air Protection Program.
Air districts are required to host workshops to help identify disadvantaged communities disproportionately affected by poor air quality. Once the criteria for identifying the highest priority locations has been identified and the communities have been selected, new community monitoring systems would be installed to track and monitor community-specific air pollution goals.
In 2018, CARB prepared an air monitoring plan (Community Air Protection Blueprint), that evaluates the availability and effectiveness of air monitoring technologies and existing community air monitoring networks. Under AB 617, the Blueprint is required to be updated every five years.
Under AB 617, CARB is also required to prepare a statewide strategy to reduce TACs and criteria pollutants in impacted communities; provide a statewide clearinghouse for best available retrofit control technology; adopt new rules requiring the latest best available retrofit control technology for all criteria pollutants for which an area has not achieved attainment of California AAQS; and provide uniform, statewide reporting of emissions inventories. Air districts are required to adopt a community emissions reduction program to achieve reductions for the communities impacted by air pollution that CARB identifies.
Regional/Local
San Joaquin Valley Air Pollution Control District (SJVAPCD) The state is divided into air pollution control districts/air quality management districts. These agencies are county or regional governing authorities that have primary responsibility for controlling air pollution from stationary sources. CARB and local air districts are also responsible for developing clean air plans to demonstrate how and when California will attain AAQS established under both the federal and California Clean Air Acts. For the areas in California that have not attained air quality standards, CARB works with air districts to develop and implement state and local attainment plans. In general, attainment plans contain a discussion of ambient air quality data and trends; a baseline emissions inventory; future year projections of emissions, which account for growth projections and already adopted control measures; a comprehensive control strategy of additional measures needed to reach attainment; an attainment demonstration, which generally involves complex modeling; and contingency measures. Plans may also include interim milestones for progress toward attainment. The San Joaquin Valley Air Basin (SJVAB) is managed by the San Joaquin Valley Air Pollution Control District (SJVAPCD).
The primary role of SJVAPCD is to develop plans and implement control measures in the SJVAB to control air pollution. These controls primarily affect stationary sources such as industry and power plants. Rules and regulations have been developed by SJVAPCD to control air pollution from a wide range of air pollution sources. SJVAPCD also provides uniform procedures for assessing potential air quality impacts of projects and for preparing the air quality section of environmental documents.
Air Quality Management Planning
The EPA requires states that have areas that do not meet the National AAQS to prepare and submit air quality plans showing how the National AAQS will be met. If the states cannot show Riverview Marketplace Commercial Project
Environmental Impact Report 4.3 Air Quality
City of Bakersfield – SCH No. 2025101507 4.3-7
how the National AAQS will be met, then the states must show progress toward meeting the National AAQS. These plans are referred to as the State Implementation Plans (SIP). CARB requires regions that do not meet California AAQS for ozone to submit clean air plans that describe measures to attain the standard or show progress toward attainment. The following describes the air quality management plans (AQMP) prepared by the SJVAPCD, which are incorporated by reference per CEQA Guidelines Section 15150:
• 2022 Plan for the 2015 8-Hour Ozone Standard. SJVAPCD adopted the 2022 plan for the 2015 8-hour ozone standard in December 2022. This plan satisfies CAA requirements and ensures expeditious attainment of the 70 parts per billion (ppb) 8-hour ozone standard. • 2016 Plan for the 2008 8-Hour Ozone Standard. SJVAPCD adopted the 2016 plan for the 2008 8 hour ozone standard in June 2016. This plan satisfies CAA requirements and ensures expeditious attainment of the 75 ppb 8-hour ozone standard. • 2014 Reasonably Available Control Technology (RACT) SIP. SJVAPCD adopted the RACT demonstration for ozone SIP in June 2014.
• 2013 Plan for the Revoked 1-Hour Ozone Standard. SJVAPCD adopted the 2013 Plan for the Revoked 1-hour ozone standard in September 2013. In 2013, the Valley had zero violations of the 1-hour federal ozone standard. On May 6, 2014, and July 13, 2015, SJVAPCD submitted formal requests that the EPA determine that the Valley has attained the federal 1-hour ozone standard. On July 18, 2016, the EPA published in the Federal Register a final action determining that the San Joaquin Valley has attained the 1 hour ozone National AAQS.
• 2009 Reasonably Available Control Technology (RACT) SIP. SJVAPCD adopted the RACT demonstration for ozone SIP in April 2009.
• 2007 Ozone Plan. SJVAPCD adopted the 2007 Ozone Plan in April 2007. This plan addresses the EPA’s 8-hour ozone standard of 84 ppb, which was established in 1997. • 2015 8-Hour Ozone Standard. The EPA set the National AAQS for 8-hour ozone at 70 ppb effective December 28, 2015. The EPA designated the San Joaquin Valley as Extreme nonattainment for this standard in August 2018, with an attainment deadline of 2037. SJVACPD was mandated under federal CAA requirements to develop a new attainment plan for the revised ozone standard by 2022. Despite the significant air quality progress that has been made in the Valley, addressing the 2015 8-hour ozone standard will pose a challenge for the San Joaquin Valley given the naturally high background ozone levels and ozone transport into the Valley. Significant further emissions reductions will be needed to come into attainment of the stringent new standard. This will require concerted ongoing effort by the SJVAPCD working closely with Valley residents, businesses, and other stakeholders to continue implementing effective and efficient air quality measures. The attainment plan for the 2015 federal ozone standard will build upon comprehensive strategies already in place from adopted SJVAPCD plans and CARB statewide strategies. The NOx reduction commitments from the recent 2018 PM2.5 Plan, 2016 Ozone Plan, and other ongoing measures will assist the Valley in meeting the 70 ppb federal ozone standard. Strategies for attainment of the 2015 8-hour ozone standard will be developed through a public process, building on decades of effective control strategies.
• 2018 Plan for the 1997, 2006, and 2012 PM2.5 Standards. SJVAPCD adopted the 2018 Plan for the 1997, 2006, and 2012 PM2.5 Standards on November 15, 2018. This plan Riverview Marketplace Commercial Project
Environmental Impact Report 4.3 Air Quality
City of Bakersfield – SCH No. 2025101507 4.3-8
addresses the EPA federal 1997 annual PM2.5 standard of 15 μg/m³ and 24-hour PM2.5 standard of 65 μg/m³, the 2006 24-hour PM2.5 standard of 35 μg/m³, and the 2012 annual PM2.5 standard of 12 μg.
• 2016 Moderate Area Plan for the 2012 PM2.5 Standard. SJVAPCD adopted the 2016 Moderate Area Plan for the 2012 PM2.5 standard on September 15, 2016. This plan addresses the EPA federal annual PM2.5 standard of 12 µg/m3, established in 2012. This plan includes an attainment impracticability demonstration and request for reclassification of the Valley from Moderate nonattainment to Serious nonattainment. • 2015 Plan for the 1997 PM2.5 Standard. SJVAPCD adopted the 2015 Plan for the 1997 PM2.5 standard on April 16, 2015. This plan addresses the EPA’s annual PM2.5 standard of 15 µg/m3 and 24-hour PM2.5 standard of 65 µg/m3, established in 1997. • 2012 PM2.5 Plan. SJVAPCD adopted the 2012 PM2.5 Plan in December 2012. This plan addresses the EPA’s 24-hour PM2.5 standard of 35 µg/m³, which was established by in 2006.
• 2008 PM2.5 Plan. SJVAPCD adopted the 2008 PM2.5 Plan in April 2008. This plan addresses the EPA’s annual PM2.5 standard of 15 µg/m³, which was established in 1997. • 2007 PM10 Maintenance Plan. SJVAPCD adopted the 2007 PM10 Maintenance Plan in September 2007 to ensure the San Joaquin Valley’s continued attainment of the EPA’s PM10 standard. The EPA designated the Valley as an attainment/maintenance area for PM10.
• 2004 Revision to the California SIP for Carbon Monoxide. On July 22, 2004, CARB approved an update to the SIP that shows how the ten areas will maintain the standard through 2018, revises emission estimates, and establishes new on-road motor vehicle emission budgets for transportation conformity purposes.
SJVAPCD Local Rules and Regulations
Assembly Bill 170, Reyes
AB 170 was adopted by State lawmakers in 2003, creating Government Code Section 65302.1, which requires cities and counties in the San Joaquin Valley to amend their general plans to include data, analysis, and comprehensive goals, policies, and feasible implementation strategies designed to improve air quality. The elements to be amended include, but are not limited to, the elements dealing with land use, circulation, housing, conservation, and open space. Section 65302.1(c) identifies four areas of air quality discussion required in these amendments:
• A report describing local air quality conditions, attainment status, and State and federal air quality and transportation plans.
• A summary of local, district, State, and federal policies, programs, and regulations to improve air quality.
• A comprehensive set of goals, policies, and objectives to improve air quality. • Feasible implementation measures designed to achieve these goals.
Rule 9510: Indirect Source Review
On December 15, 2005, SJVAPCD adopted the Indirect Source Review Rule (or Rule 9510) to reduce ozone precursors (i.e., VOC and NOX) and PM10 emissions from new land use Riverview Marketplace Commercial Project
Environmental Impact Report 4.3 Air Quality
City of Bakersfield – SCH No. 2025101507 4.3-9
development projects. Specifically, Rule 9510 targets the indirect emissions from vehicles and construction equipment associated with these projects and applies to both construction- and operational-related impacts. The rule applies to any applicant that seeks to gain a final discretionary approval for a development project, or any portion thereof, which upon full buildout would include any one of the following:
• 50 residential units.
• 2,000 square feet of commercial space.
• 25,000 square feet of light industrial space.
• 100,000 square feet of heavy industrial space.
• 20,000 square feet of medical office space.
• 39,000 square feet of general office space.
• 9,000 square feet of educational space.
• 10,000 square feet of government space.
• 20,000 square feet of recreational space.
• 9,000 square feet of space not identified above.
• Transportation/transit projects with construction exhaust emissions of 2 or more tons of NOx or 2 or more tons of PM10.
• Residential projects on contiguous or adjacent property under common ownership of a single entity, in whole or in part, that is designated and zoned for the same development density and land use, regardless of the number of tract maps, and has the capability of accommodating more than 50 residential units.
• Nonresidential projects on contiguous or adjacent property under common ownership of a single entity, in whole or in part, that is designated and zoned for the same development density and land use, and has the capability of accommodating development projects that emit 2 or more tons per year of NOX or PM10 during project operations.
The rule requires all subject, nonexempt projects to mitigate both construction and operational period emissions by (1) applying feasible SJVAPCD-approved mitigation measures, or (2) paying any applicable fees to support programs that reduce emissions. Off-site emissions reduction fees (off-site fees) are required for projects that do not achieve the required emissions reductions through on-site emission reduction measures. Phased projects can defer payment of fees in accordance with an Offsite Emissions Reduction Fee Deferral Schedule (FDS) approved by the SJVAPCD.
To determine how an individual project would satisfy Rule 9510, each project would submit an air quality impact assessment (AIA) to the SJVAPCD as early as possible, but no later than prior to the project’s final discretionary approval, to identify the project’s baseline unmitigated emissions inventory for indirect sources from: (1) on-site exhaust emissions from construction activities; and (2) operational activities from mobile and area sources of emissions (excludes fugitive dust and permitted sources). Rule 9510 requires the following reductions, which are levels that the SJVAPCD has identified as necessary, based on its air quality management plans, to reach attainment for ozone and particulate matter.
Riverview Marketplace Commercial Project
Environmental Impact Report 4.3 Air Quality
City of Bakersfield – SCH No. 2025101507 4.3-10
• Construction Equipment Emissions. The exhaust emissions for construction equipment greater than 50 horsepower (hp) used or associated with the development project shall be reduced by the following amounts from the statewide average as estimated by CARB:
• 20 percent of the total NOX emissions
• 45 percent of the total PM10 exhaust emissions
• Mitigation measures may include those that reduce construction emissions on-site by using less-polluting construction equipment, which can be achieved by utilizing add-on controls; cleaner fuels; or newer, lower-emitting equipment. • Operational Emissions
• NOx Emissions. Applicants shall reduce 33.3 percent of the project’s operational baseline NOX emissions over a period of 10 years as quantified in the approved AIA. • PM10 Emissions. Applicants shall reduce of 50 percent of the project’s operational baseline PM10 emissions over a period of 10 years as quantified in the approved AIA.
Mitigation measures may include those that reduce construction emissions on-site by using less-polluting construction equipment, which can be achieved by utilizing add-on controls; cleaner fuels; or newer, lower-emitting equipment.
These requirements can be met through any combination of on-site emission reduction measures.
In the event that a project cannot achieve the above standards through imposition of mitigation measures, the project would be required to pay the applicable off-site fees. These fees are used to fund various incentive programs that cover the purchase of new equipment, engine retrofit, and education and outreach.
Rule 2201: New and Modified Stationary Source Review
SJVAPCD adopted Rule 2201, New and Modified Stationary Source Review, to control emissions from new stationary sources and all modifications to existing stationary sources that are subject to SJVAPCD’s permit requirements (i.e., “permit projects” for which the SJVAPCD is the lead agency). Permit projects that exceed the Source Performance Standards are required to install Best Available Control Technology to control emissions to the maximum extent practicable.
Regulation VIII: Fugitive PM10 Prohibitions
SJVAPCD controls fugitive PM10 through Regulation VIII, Fugitive PM10 Prohibitions. The purpose of this regulation is to reduce ambient concentrations of PM10 and PM2.5 by requiring actions to prevent, reduce, or mitigate anthropogenic (human caused) fugitive dust emissions. • Regulation VIII, Rule 8021, applies to any construction, demolition, excavation, extraction, and other earthmoving activities, including but not limited to land clearing, grubbing, scraping, travel on-site, and travel on access roads to and from the site. • Regulation VIII, Rule 8031, applies to the outdoor handling, storage, and transport of any bulk material.
• Regulation VIII, Rule 8041, applies to sites where carryout or trackout has occurred or may occur on paved roads or the paved shoulders of public roads. • Regulation VIII, Rule 8051, applies to any open area having 0.5 acre or more in urban areas or 3.0 acres or more in rural areas and contains at least 1,000 square feet of disturbed surface area.
Riverview Marketplace Commercial Project
Environmental Impact Report 4.3 Air Quality
City of Bakersfield – SCH No. 2025101507 4.3-11
• Regulation VIII, Rule 8061, applies to any new or existing public or private paved or unpaved road, road construction project, or road modification project. • Regulation VIII, Rule 8071, applies to any unpaved vehicle/equipment traffic area. • Regulation VIII, Rule 8081, applies to off-field agricultural sources.
Sources regulated are required to provide Dust Control Plans that meet the regulation requirements. Under Rule 8021, a Dust Control Plan is required for any residential project that will include 10 or more acres of disturbed surface area, a nonresidential project with 5 or more acres of disturbed surface area, or a project that relocates 2,500 cubic yards per day of bulk materials for at least three days. The Dust Control Plan is required to be submitted to SJVAPCD prior to the start of any construction activity. The Dust Control Plan must also describe fugitive dust control measure to be implemented before, during, and after any dust-generating activity.
For sites smaller than those listed above, the project is still required to notify SJVAPCD a minimum of 48 hours prior to commencing earthmoving activities.
Rule 4102: Nuisance Odors
The SJVAPCD controls nuisance odors through implementation of Rule 4102, Nuisance.
Pursuant to this rule,
“... a person shall not discharge from any source whatsoever such quantities of air contaminants or other materials which cause injury, detriment, nuisance or annoyance to any considerable number of persons or to the public or which endanger the comfort, repose, health, or safety of any such person or the public or which cause or have a natural tendency to cause injury or damage to business or property.”
Rule 9410: Employer Based Trip Reduction Program
The SJVAPCD has implemented Rule 9410, Employer Based Trip Reduction. The purpose of this rule is to reduce vehicle miles traveled (VMT) from private vehicles used by employees to commute to and from their worksites and, in turn, reduce emissions of NOx, VOC, and particulate matter (PM10 and PM2.5). The rule applies to employers with at least 100 eligible employees.
Employers are required to implement an Employer Trip Reduction Implementation Plan (eTRIP) for each worksite with 100 or more eligible employees to meet applicable targets specified in the rule. Employers are required to facilitate the participation in the eTRIPs by providing information to their employees explaining the requirements and applicability of this rule. Employers are required to prepare and submit an eTRIP for each worksite to SJVAPCD. The eTRIP must be updated annually. Under this rule, employers shall collect information on the modes of transportation used for each eligible employee’s commutes both to and from work for every day of the commute verification period, as defined by using either the mandatory commute verification method or a representative survey method. Annual reporting includes the results of the commute verification for the previous calendar year along with the measures implemented as outlined in the eTRIP and, if necessary, any updates to the eTRIP.
City of Bakersfield Metropolitan Bakersfield General Plan The General Plan, dated December 2002, was updated in January 2016 per Resolution No. 018- 16 and 019-16. At the time this EIR was published for public review, the City was in the process of updating its Bakersfield 2045 General Plan, but it had not yet been adopted. The General Plan contains multiple goals and policies within the Conservation Element pertaining to air quality; relevant goals and policies to the Project are listed below:
Riverview Marketplace Commercial Project
Environmental Impact Report 4.3 Air Quality
City of Bakersfield – SCH No. 2025101507 4.3-12
Air Quality
Goals
1. Promote air quality that is compatible with health, well-being, and enjoyment of life by controlling point sources and minimizing vehicular trips to reduce air pollutants.
2. Continue working toward attainment of Federal, State, and Local standards as enforced by the SJVAPCD.
3. Reduce the amount of vehicular emissions in the planning area.
Policies
1. Comply with and promote SJVAPCD control measures regarding Reactive Organic Gases (ROG). Such measures are focused on: (a) steam-driven well vents, (b) Pseudo-cyclic wells, (c) natural gas processing plant fugitives, (d) heavy oil test stations, (e) light oil production fugitives, (f) refinery pumps and compressors, and (g) vehicle inspection and maintenance.
2. Encourage land uses and land use practices which do not contribute significantly to air quality degradation.
3. Require dust abatement measures during significant grading and construction operations.
4. Consider air pollution impacts when evaluating discretionary permits for land use proposals.
Considerations should include
a. Alternative access routes to reduce traffic congestion. b. Development phasing to match road capacities
c. Buffers including increased vegetation to increase emission dispersion and reduce impacts of gaseous or particulate matter on sensitive uses.
5. Consider the location of sensitive receptors such as schools, hospitals, and housing developments when locating industrial uses to minimize the impact of industrial sources of air pollution
4.3.2 Environmental Setting
Criteria Air Pollutants
The pollutants emitted into the ambient air by stationary and mobile sources are categorized as primary and/or secondary pollutants. Primary air pollutants are emitted directly from sources.
Carbon monoxide (CO), volatile organic compounds (VOC), nitrogen oxides (NOX), sulfur dioxide (SO2), coarse inhalable particulate matter (PM10), fine inhalable particulate matter (PM2.5), and lead (Pb) are primary air pollutants. Of these, CO, SO2, nitrogen dioxide (NO2), PM10, and PM2.5 are “criteria air pollutants,” which means that AAQS have been established for them. VOC and NOX are criteria pollutant precursors that form secondary criteria air pollutants through chemical and photochemical reactions in the atmosphere. Ozone (O3) and NO2 are the principal secondary pollutants.
Riverview Marketplace Commercial Project
Environmental Impact Report 4.3 Air Quality
City of Bakersfield – SCH No. 2025101507 4.3-13
Each of the primary and secondary criteria air pollutants and its known health effects are described below.
Carbon Monoxide (CO) is a colorless, odorless gas produced by incomplete combustion of carbon substances, such as gasoline or diesel fuel. CO is a primary criteria air pollutant. CO concentrations tend to be the highest during winter mornings with little to no wind, when surface-based inversions trap the pollutant at ground levels. The highest ambient CO concentrations are generally found near traffic-congested corridors and intersections. The primary adverse health effect associated with CO is interference with normal oxygen transfer to the blood, which may result in tissue oxygen deprivation. The SJVAB is designated as being in attainment/unclassified under both the California AAQS and National AAQS.
Nitrogen Oxides (NOX) are a byproduct of fuel combustion and contribute to the formation of O3, PM10, and PM2.5. The two major forms of NOX are nitric oxide (NO) and nitrogen dioxide (NO2).
The principal form of NO2 produced by combustion is NO, but NO reacts with oxygen to form NO2, creating the mixture of NO and NO2 commonly called NOX. NO2 acts as an acute irritant and, in equal concentrations, is more injurious than NO. At atmospheric concentrations, however, NO2 is only potentially irritating. NO2 absorbs blue light; the result is a brownish-red cast to the atmosphere and reduced visibility. NO2 exposure concentrations near roadways are of particular concern for susceptible individuals, including asthmatics, children, and the elderly. Current scientific evidence links short-term NO2 exposures, ranging from 30 minutes to 24 hours, with adverse respiratory effects, including airway inflammation in healthy people and increased respiratory symptoms in people with asthma. Also, studies show a connection between elevated short-term NO2 concentrations and increased visits to emergency departments and hospital admissions for respiratory issues, especially asthma. The SJVAB is designated in attainment/unclassified under the National AAQS and attainment under the California AAQS.
Sulfur Dioxide (SO2) is a colorless, pungent, irritating gas formed by the combustion of sulfurous fossil fuels. It enters the atmosphere as a result of burning high-sulfur-content fuel oils and coal and chemical processes at plants and refineries. Gasoline and natural gas have very low sulfur content and do not release significant quantities of SO2. When sulfur dioxide forms sulfates (SO4) in the atmosphere, together these pollutants are referred to as sulfur oxides (SOX). Thus, SO2 is both a primary and secondary criteria air pollutant. At sufficiently high concentrations, SO2 may irritate the upper respiratory tract. Current scientific evidence links short-term exposures to SO2, ranging from 5 minutes to 24 hours, with an array of adverse respiratory effects, including bronchoconstriction and increased asthma symptoms. These effects are particularly adverse for asthmatics at elevated ventilation rates (e.g., while exercising or playing) at lower concentrations and when combined with particulates, SO2 may do greater harm by injuring lung tissue. Studies also show a connection between short-term exposure and increased visits to emergency facilities and hospital admissions for respiratory illnesses, particularly in at-risk populations such as children, the elderly, and asthmatics. The SJVAB is designated attainment under California and as attainment/unclassified under the National AAQS.
Suspended Particulate Matter (PM10 and PM2.5) consists of finely divided solids or liquids such as soot, dust, aerosols, fumes, and mists. Two forms of fine particulates are now recognized and regulated. Inhalable coarse particles, or PM10, include the particulate matter with an aerodynamic diameter of 10 microns (i.e., 10 millionths of a meter or 0.0004 inch) or less. Inhalable fine particles, or PM2.5, have an aerodynamic diameter of 2.5 microns (i.e., 2.5 millionths of a meter or 0.0001 inch) or less. Particulate discharge into the atmosphere results primarily from industrial, agricultural, construction, and transportation activities. However, wind action on arid landscapes also contributes substantially to local particulate loading (i.e., fugitive dust). Both PM10 and PM2.5 Riverview Marketplace Commercial Project
Environmental Impact Report 4.3 Air Quality
City of Bakersfield – SCH No. 2025101507 4.3-14
may adversely affect the human respiratory system, especially in people who are naturally sensitive or susceptible to breathing problems.
The EPA’s scientific review concluded that PM2.5, which penetrates deeply into the lungs, is more likely than PM10 to contribute to health effects and at concentrations that extend well below those allowed by the current PM10 standards. These health effects include premature death and increased hospital admissions and emergency room visits (primarily the elderly and individuals with cardiopulmonary disease); increased respiratory symptoms and disease (children and individuals with cardiopulmonary disease such as asthma); decreased lung functions (particularly in children and individuals with asthma); and alterations in lung tissue and structure and in respiratory tract defense mechanisms. There has been emerging evidence that ultrafine particulates, which are even smaller particulates with an aerodynamic diameter of <0.1 microns or less (i.e., ≤0.0001 millimeter) have human health implications because their toxic components may initiate or facilitate biological processes that may lead to adverse effects to the heart, lungs, and other organs. However, the EPA and CARB have not adopted AAQS to regulate these particulates. Diesel particulate matter is classified by CARB as a carcinogen. Particulate matter can also cause environmental effects such as visibility impairment, environmental damage, and aesthetic damage (USEPA 2026a). The SJVAB is a nonattainment area for PM2.5 under California and National AAQS and a nonattainment area for PM10 under the California AAQS and an attainment area under the National AAQS.
Ozone (O3) is a key ingredient of “smog” and is a gas that is formed when VOCs and NOX, both by-products of internal combustion engine exhaust, undergo photochemical reactions in sunlight.
O3 is a secondary criteria air pollutant. O3 concentrations are generally highest during the summer months when direct sunlight, light winds, and warm temperatures create favorable conditions for its formation. O3 poses a health threat to those who already suffer from respiratory diseases as well as to healthy people. Breathing O3 can trigger a variety of health problems, including chest pain, coughing, throat irritation, and congestion. It can worsen bronchitis, emphysema, and asthma. Ground-level O3 also can reduce lung function and inflame the linings of the lungs.
Repeated exposure may permanently scar lung tissue. O3 also affects sensitive vegetation and ecosystems, including forests, parks, wildlife refuges, and wilderness areas. In particular, O3 harms sensitive vegetation during the growing season. The SJVAB is designated extreme nonattainment under the California AAQS (1-hour and 8-hour) and nonattainment under the National AAQS (8-hour).
Volatile Organic Compounds (VOC) are composed primarily of hydrogen and carbon atoms.
Internal combustion associated with motor vehicle usage is the major source of VOCs. Other sources include evaporative emissions from paints and solvents, asphalt paving, and household consumer products such as aerosols. There are no AAQS for VOCs. However, because they contribute to the formation of O3, SJVAPCD has established a significance threshold for this pollutant.
Lead (Pb) is a metal found naturally in the environment as well as in manufactured products.
Once taken into the body, lead distributes throughout the body in the blood and accumulates in the bones. Depending on the level of exposure, lead can adversely affect the nervous system, kidney function, immune system, reproductive and developmental systems, and the cardiovascular system. Lead exposure also affects the oxygen-carrying capacity of the blood. The effects of lead most commonly encountered in current populations are neurological effects in children and cardiovascular effects in adults (e.g., high blood pressure and heart disease). Infants and young children are especially sensitive to even low levels of lead, which may contribute to behavioral problems, learning deficits, and lowered IQ. The major sources of lead emissions have Riverview Marketplace Commercial Project
Environmental Impact Report 4.3 Air Quality
City of Bakersfield – SCH No. 2025101507 4.3-15
historically been mobile and industrial sources. As a result of the EPA’s regulatory efforts to remove lead from gasoline, emissions of lead from the transportation sector dramatically declined by 95 percent between 1980 and 1999, and levels of lead in the air decreased by 94 percent between 1980 and 1999. Today, the highest levels of lead in air are usually found near lead smelters. The major sources of lead emissions today are ore and metals processing and piston-engine aircraft operating on leaded aviation gasoline. However, in 2008 the EPA and CARB adopted stricter lead standards, and special monitoring sites immediately downwind of lead sources recorded very localized violations of the new state and federal standards. The SJVAB is designated attainment under the California AAQS for lead and No Designation/Classification under the National AAQS. There are no lead-emitting sources associated with the Project, and therefore, lead is not a pollutant of concern for the Project.
Toxic Air Contaminants (TACs)
People exposed to TACs at sufficient concentrations and durations may have an increased chance of getting cancer or experiencing other serious health effects. These health effects can include damage to the immune system as well as neurological, reproductive (e.g., reduced fertility), developmental, respiratory, and other health problems. By the last update to the TAC list in December 1999, CARB had designated 244 compounds as TACs. Additionally, CARB has implemented control measures for a number of compounds that pose high risks and show potential for effective control. There are no air quality standards for TACs. Instead, TAC impacts are evaluated by calculating the health risks associated with a given exposure. The majority of the estimated health risks from TACs can be attributed to relatively few compounds, the most relevant to the Project being particulate matter from diesel-fueled engines.
Diesel Particulate Matter
In 1998, CARB identified diesel particulate matter (DPM) as a TAC. Previously, the individual chemical compounds in diesel exhaust were considered TACs. Almost all diesel exhaust particles are 10 microns or less in diameter. Because of their extremely small size, these particles can be inhaled and eventually trapped in the bronchial and alveolar regions of the lungs. Long-term (chronic) inhalation of DPM is likely a lung cancer risk. Short-term (i.e., acute) exposure can cause irritation and inflammatory symptoms and may exacerbate existing allergies and asthma symptoms.
Climate
The Project is in the central portion of the SJVAB. SJVAB consists of eight counties: Fresno, Kern (western and central), Kings, Tulare, Madera, Merced, San Joaquin, and Stanislaus. Air pollution from significant activities in the SJVAB includes a variety of industrial-based sources as well as on- and off-road mobile sources. These sources, coupled with geographical and meteorological conditions unique to the area, stimulate the formation of unhealthy air.
The SJVAB is approximately 250 miles long and an average of 35 miles wide. It is bordered by the Sierra Nevada in the east, the Coast Ranges in the west, and the Tehachapi mountains in the south. There is a slight downward elevation gradient from Bakersfield in the southeast end (elevation 408 feet) to sea level at the northwest end where the valley opens to the San Francisco Bay at the Carquinez Straits. At its northern end is the Sacramento Valley, which makes up the northern half of California’s Central Valley. The bowl-shaped topography inhibits movement of pollutants out of the valley.
Riverview Marketplace Commercial Project
Environmental Impact Report 4.3 Air Quality
City of Bakersfield – SCH No. 2025101507 4.3-16
The SJVAB is in a Mediterranean climate zone, which is characterized by sparse rainfall, which occurs mainly in winter. Summers are hot and dry. Summertime maximum temperatures often exceed 100 degrees Fahrenheit (°F) in the valley. Winter-time high pressure events can often last many weeks, with surface temperatures often lowering to 30°F. During these events, fog can be present, and inversions are extremely strong. These wintertime inversions can inhibit vertical mixing of pollutants to a few hundred feet.
In addition, the SJVAB is influenced by a subtropical high-pressure cell for most of the year. The high-pressure cell is strongest during spring, summer, and fall and produces subsiding air, which can result in temperature inversions in the valley. A temperature inversion can act like a lid, inhibiting vertical mixing of the air mass at the surface. Any emissions of pollutants can be trapped below the inversion. Most of the surrounding mountains are above the normal height of summer inversions (1,500 to 3,000 feet).
Temperature
Solar radiation and temperature are particularly important in the chemistry of ozone formation.
The SJVAB averages over 260 sunny days per year. Photochemical air pollution (primarily ozone) is produced by the atmospheric reaction of organic substances (such as volatile organic compounds) and nitrogen dioxide under the influence of sunlight. Ozone concentrations are very dependent on the amount of solar radiation, especially during late spring, summer, and early fall.
Ozone levels typically peak in the afternoon. After the sun goes down, the chemical reaction between nitrous oxide and ozone begins to dominate. This reaction tends to scavenge and remove the ozone in the metropolitan areas through the early morning hours, resulting in the lowest ozone levels, possibly reaching zero at sunrise in areas with high nitrogen oxides emissions. At sunrise, nitrogen oxides tend to peak, partly due to low levels of ozone at this time and also due to the morning commuter vehicle emissions of nitrogen oxides.
Generally, the higher the temperature, the more ozone formed, since reaction rates increase with temperature. However, extremely hot temperatures can “lift” or “break” the inversion layer.
Typically, if the inversion layer does not lift to allow the buildup of contaminants to be dispersed, the ozone levels will peak in the late afternoon. If the inversion layer breaks and the resultant afternoon winds occur, the ozone will peak in the early afternoon and decrease in the late afternoon as the contaminants are dispersed or transported out of the SJVAB. Ozone levels are low during winter periods when there is much less sunlight to drive the photochemical.
Wind
Wind speed and direction play an important role in dispersion and transport of air pollutants. Wind at the surface and aloft can disperse pollution by mixing and transporting it to other locations.
Winds in the valley most frequently blow from the northwest, especially during summer. The region’s topographic features restrict air movement and channel the air mass towards the southeastern end of the valley. Marine air can flow into the basin from the San Joaquin River Delta and over Altamont Pass and Pacheco Pass, where it can flow along the axis of the valley, over the Tehachapi Pass, into the Southeast Desert Air Basin. This wind pattern contributes to transporting pollutants from the Sacramento Valley and the Bay Area into the SJVAB.
Approximately 27 percent of the total emissions in the northern portion, 11 percent of total emissions in the central region, and 7 percent of total emission in the south valley of the SJVAB are attributed to air pollution transported from these two areas. The Coastal Range is a barrier to air movement to the west, and the high Sierra Nevada range is a significant barrier to the east (the highest peaks in the southern Sierra Nevada reach almost halfway through the Earth’s Riverview Marketplace Commercial Project
Environmental Impact Report 4.3 Air Quality
City of Bakersfield – SCH No. 2025101507 4.3-17
atmosphere). Many days in the winter are marked by stagnation events where winds are very weak. Transport of pollutants during winter can be very limited. A secondary but significant summer wind pattern is from the southeast and can be associated with nighttime drainage winds, prefrontal conditions, and summer monsoons.
Two significant diurnal wind cycles that occur frequently in the valley are the sea breeze and mountain-valley upslope and drainage flows. The sea breeze can accentuate the northwest wind flow, especially on summer afternoons. Nighttime drainage flows can accentuate the southeast movement of air down the valley. In the mountains during periods of weak synoptic-scale winds, winds tend to be upslope during the day and downslope at night. Nighttime and drainage flows are especially pronounced during the winter when flow from the east is enhanced by nighttime cooling in the Sierra Nevada. Eddies can form in the valley wind flow and can recirculate a polluted air mass for an extended period.
Precipitation, Humidity, and Fog
Precipitation and fog may reduce or limit some pollutant concentrations. Ozone needs sunlight for its formation, and clouds and fog can block the required solar radiation. Wet fogs can cleanse the air during winter as moisture collects on particles and deposits them on the ground.
Atmospheric moisture can also increase pollution levels. In fogs with less water content, the moisture acts to form secondary ammonium nitrate particulate matter. This ammonium nitrate is part of the valley’s PM 2.5 and PM10 problem. The winds and unstable air conditions during the passage of winter storms result in periods of low pollutant concentrations and excellent visibility.
Between winter storms, high pressure and light winds allow cold moist air to pool on the SJVAB floor. This creates strong low-level temperature inversions and very stable air conditions, which can lead to tule fog. Wintertime conditions favorable to fog formation are also favorable to high concentrations of PM 2.5 and PM10.
Inversions
The vertical dispersion of air pollutants in the San Joaquin Valley can be limited by persistent temperature inversions. Air temperature in the lowest layer of the atmosphere typically decreases with altitude. A reversal of this atmospheric state, where the air temperature increases with height, is termed an inversion. The height of the base of the inversion is known as the “mixing height.” This is the level to which pollutants can mix vertically. Mixing of air is minimized above and below the inversion base. The inversion base represents an abrupt density change where little air movement occurs.
Inversion layers are significant in determining pollutant concentrations. Concentration levels can be related to the amount of mixing space below the inversion. Temperature inversions that occur on the summer days are usually 2,000 to 2,500 feet above the valley floor. In winter months, overnight inversions occur 500 to 1,500 feet above the valley floor.
SJVAB Area Designations
The air quality management plans prepared by SJVAPCD provide the framework for SJVAB to achieve attainment of the State and federal AAQS through the SIP. Areas are classified as attainment or nonattainment areas for particular pollutants depending on whether they meet the ambient air quality standards. Severity classifications for ozone nonattainment range in magnitude from marginal, moderate, and serious to severe and extreme.
Riverview Marketplace Commercial Project
Environmental Impact Report 4.3 Air Quality
City of Bakersfield – SCH No. 2025101507 4.3-18
• Unclassified. A pollutant is designated unclassified if the data are incomplete and do not support a designation of attainment or nonattainment.
• Attainment. A pollutant is in attainment if the AAQS for that pollutant was not violated at any site in the area during a three-year period.
• Nonattainment. A pollutant is in nonattainment if there was at least one violation of an AAQS for that pollutant in the area.
• Nonattainment/Transitional. A subcategory of the nonattainment designation. An area is designated nonattainment/transitional to signify that the area is close to attaining the AAQS for that pollutant.
The attainment status for the SJVAB is shown in Table 4.3-2 Attainment Status of Criteria Pollutants in the San Joaquin Valley Air Basin.
Table 4.3-2 Attainment Status of Criteria Pollutants in the San Joaquin Valley Air Basin.
Pollutant State Federal
Ozone – 1-hour Severe Nonattainment No Federal Standard1 Ozone – 8-hour Nonattainment Extreme Nonattainment2
PM10 Nonattainment Attainment3
PM2.5 Nonattainment Nonattainment4
CO Attainment/Unclassified Attainment/Unclassified
NO2 Attainment Attainment/Unclassified
SO2 Attainment Attainment/Unclassified
Lead Attainment No Designation/Classification
Hydrogen Sulfide Unclassified No Federal Standard
Sulfates Attainment No Federal Standard
Visibility Reducing Particles Unclassified No Federal Standard Vinyl Chloride Attainment No Federal Standard
Source: CARB 2026a; SJVAPCD 2026c.
1 Though the Valley was initially classified as serious nonattainment for the 1997 8-hour ozone standard, the EPA approved Valley reclassification to extreme nonattainment in the Federal Register on May 5, 2010 (effective June 4, 2010). 2 Effective June 15, 2005, the EPA revoked the federal 1-hour ozone standard, including associated designations and classifications. The US EPA had previously classified the SJVAB as extreme nonattainment for this standard. The US EPA approved the 2004 Extreme Ozone Attainment Demonstration Plan on March 8, 2010 (effective April 7, 2010). Many applicable requirements for extreme 1-hour ozone nonattainment areas continue to apply to the SJVAB.
3 On September 25, 2008, the EPA redesignated the San Joaquin Valley to attainment for the PM10 National AAQS and approved the PM10 Maintenance Plan.
4 The Valley is designated nonattainment for the 1997 PM2.5 National AAQS. The EPA designated the Valley as nonattainment for the 2006 PM2.5 National AAQS on November 13, 2009 (effective December 14, 2009).
Existing Ambient Air Quality
Existing levels of ambient air quality and historical trends and projections in the vicinity of the Project Site are best documented by measurements taken by the SJVAPCD. The air quality monitoring station closest to the Project is the Bakersfield-5558 California Avenue Monitoring Station, which is one of 29 monitoring stations SJVAPCD operates and maintains in the SJVAB.
Data from this station includes measurements of O3, NO2, PM10, and PM2.5 and are summarized in Table 4.3-3 Ambient Air Quality Monitoring Summary. The most current five years of data from this monitoring station is included in Table 4.3-3 Ambient Air Quality Monitoring Summary and show regular violations of the state and federal O3, state and federal PM10 standards, and federal PM2.5 standards in the last five years.
Riverview Marketplace Commercial Project
Environmental Impact Report 4.3 Air Quality
City of Bakersfield – SCH No. 2025101507 4.3-19
Table 4.3-3 Ambient Air Quality Monitoring Summary
Pollutant/Standard
Number of Days Thresholds Were Exceeded
and
Maximum Levels1
2020 2021 2022 2023 2024
Ozone (O3)
State 1-Hour 0.09 ppm (days exceed threshold)
State & Federal 8-hour 0.070 ppm (State/Federal days
exceed threshold)
Max. 1-Hour Conc. (ppm)
Max. 8-Hour Conc. (ppm)
3 25/25
0.110
0.098
0 11/11
0.090
0.080
0 7/4
0.093
0.076
0 7/7
0.088
0.079
2 38/36
0.099
0.089
Nitrogen Dioxide (NO2)
State 1-Hour 0.18 ppm (days exceed threshold)
Max. 1-Hour Conc. (ppm)
0 0.0504
0 0.057
2 0
0.0536
0 0.057
7 0
0.056
6 Coarse Particulates (PM10)
State 24-Hour > 50 µg/m3 (days exceed threshold)
Federal 24-Hour > 150 µg/m3 (days exceed threshold)
Max. 24-Hour Conc. (µg/m3)
18 1
196.8
124
3 437.5
135
0 134.7
106
1 181.3
110
0 129.7
Fine Particulates (PM2.5)
Federal 24-Hour > 35 µg/m3 (days exceed threshold)
Max. 24-Hour Conc. (µg/m3)
44 150.7
40 72.3
34 58.1
9 63.7
15 71.9
Source: CARB 2026c.
Notes: ppm = parts per million; ppb = parts per billion; µg/m3 = micrograms per cubic meter; * = Data not available 1 Data obtained from the Bakersfield-5558 California Avenue Monitoring Station.
Sensitive Receptors
Some land uses are considered more sensitive to air pollution than others due to the types of population groups or activities involved. Sensitive population groups include children, the elderly, the acutely ill, and the chronically ill, especially those with cardiorespiratory diseases.
Residential areas are also considered sensitive receptors to air pollution because residents (including children and the elderly) tend to be at home for extended periods of time, resulting in sustained exposure to any pollutants present. Other sensitive receptors include retirement facilities, hospitals, and schools. Recreational land uses are considered moderately sensitive to air pollution. Although exposure periods are generally short, exercise places a high demand on respiratory functions, which can be impaired by air pollution. In addition, noticeable air pollution can detract from the enjoyment of recreation. Industrial, commercial, retail, and office areas are considered the least sensitive to air pollution. Exposure periods are relatively short and intermittent because the majority of the workers tend to stay indoors most of the time. In addition, the working population is generally the healthiest segment of the public.
Nearby off‐site sensitive receptors include the mobile-home park residences 750 feet to the west, single-family residences 800 feet to the southwest, and single-family residences 1,300 feet to the north of the Project Site. Additionally, there are two buildings approximately 200 to 450 feet west of the Project across El Toro Viejo Road. However, it is uncertain whether these two buildings currently house residents or are used for nonresidential purposes only. For purposes of the analysis, they are assumed as residential homes. Additionally, for purposes of the analysis, workers are also included as sensitive receptors. The nearest worker receptors are the off-site workers at the surrounding businesses.
Riverview Marketplace Commercial Project
Environmental Impact Report 4.3 Air Quality
City of Bakersfield – SCH No. 2025101507 4.3-20
4.3.3 Impact Analysis
As stated in Appendix G of the CEQA Guidelines, the significance criteria established by the applicable air quality management district may be relied on to make the above determinations.
Thus, this analysis also evaluates the Project’s air quality impacts pursuant to SJVAPCD’s recommended guidelines and thresholds of significance, as discussed further below. Per CEQA Guidelines, an impact is considered significant if the Project would:
• Conflict with or obstruct implementation of the applicable air quality plan. • Result in a cumulatively considerable net increase of any criteria pollutant for which the project region is non-attainment under an applicable federal or state ambient air quality standard.
• Expose sensitive receptors to substantial pollutant concentrations. • Result in other emissions (such as those leading to odors) adversely affecting a substantial number of people.
SJVAPCD developed the Guide for Assessing and Mitigating Air Quality Impacts (GAMAQI) and adopted the latest version on March 19, 2015. The current GAMAQI is the latest guidance for addressing air quality impacts in the SJVAB. Changes to the GAMAQI are primarily administrative in nature to update air basin information, attainment status, and general guidance to reflect updated conditions. The following thresholds of significance from the SJVAPCD’s GAMAQI are used to determine whether a Project would result in a significant air quality impact.
SJVAPCD has identified regional construction and operational emissions thresholds to determine a project’s cumulative impact on air quality in the SJVAB. Specifically, these thresholds gauge whether a project would significantly contribute to a nonattainment designation based on the mass emissions generated. Mass emissions from a project are not correlated with concentrations of air pollutants. Table 4.3-4, SJVAPCD Regional Criteria Air Pollutants Significance Thresholds, lists SJVAPCD’s regional significance thresholds. It should be noted that SJVAPCD Rule 9510 and Regulation VIII may not reduce project-specific construction and operational emissions to below the SJVAPCD thresholds.
Table 4.3-4 SJVAPCD Regional Criteria Air Pollutants Significance Thresholds Air Pollutant Construction and Operation Phase
Reactive Organic Gases (ROG) 10 tons/year
Carbon Monoxide (CO) 100 tons/year
Nitrogen Oxides (NOX) 10 tons/year
Sulfur Oxides (SOX) 27 tons/year
Coarse Particulates (PM10) 15 tons/year
Fine Particulates (PM2.5) 15 tons/year
Source: SJVAPCD 2015b.
Ambient Air Quality Analysis
The need to perform air quality dispersion modeling for typical urban development projects is determined on a case-by-case basis, depending on project size. SJVAPCD applies the following guidance in determining whether an ambient air quality analysis should be conducted for development projects. Compliance with Rule 9510 frequently reduces project-specific emissions to less than significant levels. However, for large construction projects, additional mitigation may Riverview Marketplace Commercial Project
Environmental Impact Report 4.3 Air Quality
City of Bakersfield – SCH No. 2025101507 4.3-21
be required. SJVAPCD recommends that an ambient air quality analysis be performed for all pollutants when on-site emissions of any criteria pollutant from construction activities would equal or exceed any applicable threshold of significance for criteria pollutants, or 100 pounds per day of any criteria pollutant, after compliance with Rule 9510 requirements and implementation of all enforceable mitigation measures. Similarly, SJVAPCD also recommends that an ambient air quality analysis be performed for all criteria pollutants when emissions of any criteria pollutant resulting from project operational activities exceed the 100 pounds per day screening level, after compliance with Rule 9510 requirements and implementation of all enforceable mitigation measures. For projects that exceed the100 pounds per day screening level, project-related concentrations are compared to the following National Ambient Air Quality Standards (NAAQS) and California Ambient Air Quality Standards (CAAQS) shown in Table 4.3-5, Ambient Air Quality Thresholds.
Additionally, if either the NAAQS and/or CAAQS are exceeded, the SJVAPCD developed the significant impact levels (SILs) shown in Table 4.3-6, SJVAPCD Significant Impact Levels, to determine whether a project’s contribution would contribute significantly to an AAQS exceedance.
Table 4.3-5 Ambient Air Quality Thresholds
Pollutant
Averaging
Period
NAAQS
µg/m3
CAAQS
µg/m3
NO2
1-hour 188.7 339
Annual 100 57
CO 1-hour 40,000 23,000
8-hour 10,000 10,000
SO2
1-hour 196 655
3-hour 1,300 n/a
24-hour 365 105
Annual n/a n/a
PM10
24-hour 150 50
Annual n/a 20
PM2.5
24-hour 35 n/a
Annual 12 12
Notes: NAAQS = National Ambient Air Quality Standard; CAAQS = California Ambient Air Quality Standard; μg/m3 = micrograms per cubic meter.
Table 4.3-6 SJVAPCD Significant Impact Levels
Pollutant
Averaging
Period
Class II Significant Impact Levels
µg/m3
NO2
1-hour 7.5
Annual 1
CO 1-hour 2.000
8-hour 500
SO2
1-hour 7.8
3-hour 25
24-hour 5
Annual 1
PM101
24-hour 10.4
Annual 2.08
PM2.51
24-hour 2.5
Annual 0.63
Source: SJVAPCD 2024.
Notes: μg/m3 = micrograms per cubic meter
Riverview Marketplace Commercial Project
Environmental Impact Report 4.3 Air Quality
City of Bakersfield – SCH No. 2025101507 4.3-22
Pollutant
Averaging
Period
Class II Significant Impact Levels
µg/m3
1 Because the proposed project is a land use development project and emissions would primarily be from non-point sources, the fugitive PM10 and PM2.5 SILs are utilized.
Consistency with the Applicable Air Quality Plan
SJVAPCD has prepared plans to attain federal and State AAQS. The significance thresholds in Table 4.3-4, SJVAPCD Regional Criteria Air Pollutants Significance Thresholds, are based on SJVAPCD’s New Source Review offset requirements for stationary sources. Emission reductions achieved through implementation of SJVAPCD’s offset requirements are a major component of SJVAPCD’s air quality plans. Thus, projects with emissions below the thresholds of significance for criteria pollutants would be determined to “not conflict or obstruct implementation of the [SJVAPCD’s] air quality plan.”
Odor
Odor impacts associated with a proposed project would be considered significant if the project has the potential to frequently expose members of the public to objectionable odors. There are two general scenarios where a project could expose people to substantial odors:
• Odor Generator. Projects that would potentially generate odorous emissions proposed to locate near existing sensitive receptors or other land uses where people may congregate. • Odor Receiver. Residential or other sensitive receptor projects or other projects built for the intent of attracting people locating near existing odor sources.
Due to the subjective nature of odor impacts, the number of variables that can influence the potential for an odor impact, and the variety of odor sources, there are no quantitative or formulaic methodologies to determine if potential odors would have a significant impact. Rather, projects must be assessed on a case-by-case basis. As shown in Table 4.3-7, SJVAPCD Screening Levels for Potential Odor Sources, the SJVAPCD has identified buffer distances for common types of facilities that have been known to produce odors in the SJVAB. The degree of odors could be significant and may be based on a review of SJVAPCD’s complaint records.
Table 4.3-7 SJVAPCD Screening Levels for Potential Odor Sources Land Use/Type of Operation Screening Distance
Wastewater Treatment Plant 2 miles
Sanitary Landfill 1 mile
Transfer Station 1 mile
Composting Facility 1 mile
Petroleum Refinery 2 miles
Asphalt Batch Plant 1 mile
Chemical Manufacturing 1 mile
Fiberglass Manufacturing 1 mile
Painting/Coating Operations 1 mile
Food Processing Facility 1 mile
Feed Lot/ Dairy 1 mile
Rendering Plant 1 mile
Source: SJVAPCD 2015b
Riverview Marketplace Commercial Project
Environmental Impact Report 4.3 Air Quality
City of Bakersfield – SCH No. 2025101507 4.3-23
For a project located near an existing source of odors, in California Building Industry Association v. Bay Area Air Quality Management District (CBIA), the California Supreme Court ruled that CEQA generally does not require an evaluation of impacts of the environment on a project unless a project will exacerbate an existing environmental hazard. 2 Health Risk Thresholds
Whenever a project would require use of chemical compounds that have been identified in SJVAPCD’s Rule 2201; placed on CARB’s air toxics list pursuant to AB 1807, Toxic Air Contaminant Identification and Control Act; or placed on the EPA’s National Emissions Standards for Hazardous Air Pollutants, a health risk assessment is warranted. If a project would place sensitive land uses proximate to major sources of TACs (roadways with over 50,000 vehicles per day or major stationary sources), a health risk assessment may also be warranted. Table 4.3-8, SJVAPCD Toxic Air Contaminants Incremental Risk Thresholds, lists the SJVAPCD’s TAC incremental risk thresholds for operation of a project or placement of sensitive land uses proximate to major sources of air pollution. As stated under the CBIA ruling, though CEQA is generally not required to analyze impacts of the environment on a project, where a project will exacerbate an existing environmental hazard, CEQA requires an analysis of the worsened condition on future project residents and the public at large. However, projects that do not generate emissions that exceed the values in Table 4.3-8 would not substantially contribute to cumulative air quality hazards or exacerbate an existing environmental hazard.
Table 4.3-8 SJVAPCD Toxic Air Contaminants Incremental Risk Thresholds Risk Type Threshold
Cancer Risk1 ≥ 20 in 1 million
Hazard Index2 ≥ 1.0
Source: SJVAPCD 2015b.
1 For the Maximum Exposed Individuals (MEI).
2 Ground-level concentrations of noncarcinogenic TACs for the MEI.
Methodology
The air quality evaluation was prepared in accordance with the requirements of CEQA to determine if significant air quality impacts are likely in conjunction with the type and scale of development associated with the Project. Air pollutant and GHG emissions are calculated using the California Emissions Estimator Model (CalEEMod), version 2022.1. CalEEMod compiles an emissions inventory of construction (fugitive dust, off-gas emissions, on-road emissions, and off-road emissions), area sources, indirect emissions from energy use, mobile sources, indirect emissions from waste disposal (annual only), and indirect emissions from water/wastewater (annual only).
The analysis of electricity and natural gas usage for the Project is based on CalEEMod version 2022.1, which quantifies energy use associated with the proposed land uses. In addition, fuel consumption data from EMFAC2021 version 1.0.2 and OFFROAD version 1.1.3. are used to quantify fuel usage related to construction equipment operation and construction- and operation-related vehicle trips (e.g., construction worker trips and patron vehicle trips).
The full methodology as well as output from the model runs for both construction and operational activity are provided in Appendix B.
2 https://law.justia.com/cases/california/supreme-court/2015/s213478.html.
Riverview Marketplace Commercial Project
Environmental Impact Report 4.3 Air Quality
City of Bakersfield – SCH No. 2025101507 4.3-24
Construction Emissions
The assumed construction activities, phasing, and construction equipment is based on information provided by the Project applicant and CalEEMod defaults. Demolition debris generated from the left turn lane installation would result in the export of 575 tons of demolition debris. The Project Site would be a balanced site and site preparation and grading activities would not result in export or import of soil. Emissions of VOCs would primarily be from the application of paints, asphalt pavement, and operation of construction vehicles and off-road equipment.
Emissions of NOX, CO, and SOX would primarily be generated from operation of off-road construction equipment as well as construction worker and vendor vehicles. Coarse and fine particulate matter (PM10 and PM 2.5) exhaust emissions would also be generated from operation of off-road construction equipment and construction and vendor vehicle trips. Fugitive dust emissions of PM10 and PM2.5 would be generated from ground disturbance activities and asphalt demolition.
Operational Emissions
The operational-phase, project-related emissions are based on development of the new proposed commercial and retail land uses. The modeling accounts for the average daily vehicle trips generated, energy usage, water demand, and wastewater and solid waste generation from operation of the proposed project. Construction emissions are based on information provided for the Project. Where specific information was not available, CalEEMod default values were utilized.
Project Impacts
Threshold AQ-1: Would the project conflict with or obstruct implementation of the applicable air quality plan?
Impact Analysis
The following describes potential air quality impacts and consistency of the proposed Project with AQMPs developed by the SJVAPCD and described above.
The SJVAPCD is responsible for reducing emissions from area, stationary, and mobile sources in the SJVAB to achieve the National and California AAQS. A consistency determination with the AQMPs plays an important role in local agency project review by linking local planning and individual projects to the AQMPs. It fulfills the CEQA goal of informing decision makers of the environmental efforts of the project under consideration early enough to ensure that air quality concerns are fully addressed. It also provides the local agency with ongoing information as to whether they are contributing to the clean air goals in the AQMPs.
Kern COG is one of SJVAPCD’s partners in the preparation of the AQMPs, providing the latest economic and demographic forecasts and developing transportation measures in Kern County.
Regional population, housing, and employment projections developed by Kern COG are based, in part, on a city’s general plan land use designations. These projections form the foundation for the emissions inventory of the AQMPs and are incorporated into the regional transportation plan/sustainable communities strategy (RTP/SCS) prepared by Kern COG to determine priority transportation projects and vehicle miles traveled in the Kern COG region. Because the AQMPs’ strategies are based on projections from local general plans, projects that are consistent with the local general plan are considered consistent with the air quality-related regional plan. Additionally, only large projects have the potential to substantially affect the demographic forecasts in the AQMPs.
Riverview Marketplace Commercial Project
Environmental Impact Report 4.3 Air Quality
City of Bakersfield – SCH No. 2025101507 4.3-25
The Project’s proposed land uses are not permitted under the existing P land use designation. A general plan amendment would be required to change the land use designation from P to LI to allow for uses permitted under the C-O (Professional and Administrative Office), C-1 (Neighborhood Commercial) and C-2 (Regional Commercial) zones.
Also, under CEQA Guidelines Section 15206(b), a proposed project is considered of statewide, regional, or area-wide significance if the project is a commercial office building of 250,000 square feet or more or employs 1,000 or more employees and/or a shopping center of 500,000 square feet or more or employs 1,000 or more employees. The amount of retail space proposed and the projected number of new jobs generated would be less than 500,000 square feet and 1,000 employees. Thus, the Project would not substantially affect demographic projections beyond what is accounted for in the AQMPs.
However, per SJVAPCD guidance, project consistency with the AQMPs is based on whether project emissions would exceed the SJVAPCD regional significance thresholds. As discussed in Threshold AQ-2, the Project would exceed the regional operation significance thresholds for VOC and NOX and would cumulatively contribute to the nonattainment designations in the SJVAB without mitigation.
Therefore, the Project would implement Mitigation Measure (MM) AQ-1, which would require a Voluntary Emission Reduction Agreement (VERA) for the Project; MM AQ-2, which restricts paints and coatings that can be used for the Project; and MM GHG-3, which requires landscaping equipment to be all electric. As further described under Impact AQ-2, implementation of these MMs, in addition to compliance with the Indirect Source Review program under SJVAPCD Rule 9510, would, at minimum, offset the amount of Project-related regional emissions of VOC and NOX that exceed their SJVAPCD regional significance thresholds. Implementation of MM AQ-1 would also ensure consistency of the proposed project with the applicable SJVAPCD air quality plans and ensure that operation of the Project would not cumulatively contribute to the nonattainment designations of the SJVAB. Therefore, impacts would be significant with mitigation incorporated.
Mitigation Measures
Refer to MM AQ-1 and MM AQ-2 below under Impact AQ-2. In addition, please also refer to MM GHG-1 through MM GHG-3 in Section 4.8, Greenhouse Gas Emissions, of this Draft EIR.
Level of Significance After Mitigation
Less than significant with mitigation incorporated.
Threshold AQ-2: Would the project result in a cumulatively considerable net increase of any criteria pollutant for which the project region is in non-attainment under an applicable federal or state ambient air quality standard?
Impact Analysis
Regional Construction Emissions
Construction activities associated with the Project would temporarily increase PM10, PM2.5, VOC, NOX, SOX, and CO regional emissions in the SJVAB. The primary source of NOX, CO, and SOX emissions is the operation of construction equipment. The primary sources of particulate matter (PM10 and PM2.5) emissions are activities that disturb the soil, such as grading and excavation, Riverview Marketplace Commercial Project
Environmental Impact Report 4.3 Air Quality
City of Bakersfield – SCH No. 2025101507 4.3-26
asphalt demolition, and building construction. The primary source of VOC emissions is the application of architectural coating and off-gas emissions associated with asphalt paving.
Construction air pollutant emissions are based on the preliminary construction information provided by the Project applicant and CalEEMod defaults. Construction would entail site preparation, grading, utility trenching, construction of the proposed buildings, architectural coating, and asphalt paving. The Project would also include installation of a left-turn lane on Rosedale Highway in addition to the installation of a traffic signal in the southeast corner of Coffee Road and Jet Way. An estimate of maximum daily construction emissions for the Project is provided in Table 4.3-9, Annual Regional Construction Emissions.
Table 4.3-9 Annual Regional Construction Emissions
Construction Year
Criteria Air Pollutants
(tons per year)
VOC1 NOX CO SOX PM10 PM2.5
Phase 1
Year 2026 1 1 1 <1 <1 <1
Maximum Annual
Emissions 1 1 1 <1 <1 <1
SJVAPCD Threshold 10 10 100 27 15 15
Significant? No No No No No No
Phase 2
Year 2027 <1 <1 1 <1 <1 <1
Maximum Annual
Emissions <1 <1 1 <1 <1 <1
SJVAPCD Threshold 10 10 100 27 15 15
Significant? No No No No No No
Left-Turn Lane
Year 2026 <1 <1 <1 <1 <1 <1
Maximum Annual
Emissions <1 <1 <1 <1 <1 <1
SJVAPCD Threshold 10 10 100 27 15 15
Significant? No No No No No No
Traffic Signal
Year 2026 <1 <1 <1 <1 <1 <1
Maximum Annual
Emissions
<1 <1 <1 <1 <1 <1
SJVAPCD Threshold 10 10 100 27 15 15
Significant? No No No No No No
Overall Project Buildout2
Year 2026 1 1 2 <1 <1 <1
Year 2027 <1 <1 1 <1 <1 <1
Maximum Annual Emissions 1 1 2 <1 <1 <1
SJVAPCD Threshold 10 10 100 27 15 15
Significant? No No No No No No
Source: CalEEMod Version 2022.1.
1 The proposed project would include 601,224 square feet of surface parking lot asphalt paving and 462,790 square feet of non-parking lot asphalt paving for a total of 1,063,714 square feet of asphalt surfaces. However, the modeled VOC emissions results shown in this table are based on 1,485,982 square feet of asphalt surfaces and represents a conservative estimate. 2 Includes Phase 1 and 2 and the off-site improvements (i.e., left-turn lane and traffic signal).
As shown in Table 4.3-9, Annual Regional Construction Emissions, construction activities associated with the Project would not result in short-term emissions that would exceed the SJVAPCD regional thresholds for any of the air quality pollutants. Thus, construction of the Project Riverview Marketplace Commercial Project
Environmental Impact Report 4.3 Air Quality
City of Bakersfield – SCH No. 2025101507 4.3-27
would not result in emissions that cumulatively contribute to the nonattainment designations of the SJVAB.
Ambient Air Quality
The SJVAPCD requires dispersion modeling for projects that result in average daily construction-related emissions that exceed the screening criteria of 100 pounds per day. As shown in Table 4.3-10, Average Daily Construction-Related Emissions, the project-related construction activities would not generate emissions that would exceed the 100 pounds per day screening criteria. Therefore, project-related construction activities would not cause or contribute to a violation of the ambient air quality standards.
Table 4.3-10 Average Daily Construction-Related Emissions Construction Phase
Criteria Air Pollutants
(pounds/day)1
VOC NOX CO SO2 PM10 PM2.5
Phase 1 Construction Related Emissions2 11 8 14 <1 2 1
Phase 2 Construction Related Emissions3 5 6 12 <1 2 <1
Left-Turn Lane Construction Related Emissions4 <1 3 4 <1 1 <1 Traffic Signal Construction Related Emissions5 <1 <1 1 <1 <1 <1 Overall Project Construction Related Emissions6 8 8 14 <1 2 1 SJVAPCD Ambient Air Quality Screening
Threshold 100 100 100 100 100 100
Exceeds Thresholds? No No No No No No
Source: CalEEMod Version 2022.1.
1 Based on the preliminary information provided by the project applicant. Where specific information regarding project-related construction activities was not available, construction assumptions were based on CalEEMod defaults, which are based on construction surveys conducted by South Coast AQMD of construction equipment and phasing for comparable projects. 2 Average daily emissions are calculated by dividing the total annual emissions by the total number of workdays estimated at 206 days. 3 Average daily emissions are calculated by dividing the total annual emissions by the total number of workdays estimated at 145 days. 4 Average daily emissions are calculated by dividing the total annual emissions by the total number of workdays estimated at 31 days. 5 Average daily emissions are calculated by dividing the total annual emissions by the total number of workdays estimated at 40 days. 6 Average daily emissions are calculated by dividing the total annual emissions by the total number of workdays estimated at 351 days.
Operational
Regional Emissions
Operation of the Project would generate criteria air pollutant emissions from area sources (e.g., landscaping equipment, architectural coating) and energy (i.e., natural gas used for heating and cooking). Table 4.3-11, Annual Regional Operation Emissions, shows the criteria pollutant emissions that would be generated by each development phase as well as full buildout of the Project. As shown in the table, operation of the Project at full buildout would result in exceedance of the SJVAPCD regional emissions threshold for VOC and NOX, primarily due to project-related mobile-sources. Both VOC and NOX are ozone precursors. NOX is also a precursor to the formation of particulate matter (PM10 and PM2.5). Thus, emissions of VOC and NOX that exceed the respective SJVAPCD regional thresholds would cumulatively contribute to the O3, PM10, and PM2.5 nonattainment designations of the SJVAB. Therefore, without any reduction measures, operation of the Project would contribute to the nonattainment designation of the SJVAB.
Riverview Marketplace Commercial Project
Environmental Impact Report 4.3 Air Quality
City of Bakersfield – SCH No. 2025101507 4.3-28
Table 4.3-11 Annual Regional Operation Emissions
Source
Criteria Air Pollutants
(tons per year)
VOC NOx CO SO2 PM10 PM2.5
Phase 1 (2026 Opening Year)
Mobile1,2 12 9 64 <1 12 3
Area 2 <1 1 <1 <1 <1
Energy <1 <1 <1 <1 <1 <1
Total 13 9.7 65 <1 12 3
Phase 2 (2027 Opening Year)
Mobile1,3 1 1 8 <1 2 <1
Area <1 <1 <1 <1 <1 <1
Energy <1 <1 <1 <1 <1 <1
Total 2 1 8 <1 2 <1
Full Buildout (2027 Full Buildout Year)
Mobile1,3 13 10 68 <1 13 3
Area 2 <1 2 <1 <1 <1
Energy <1 <1 <1 <1 <1 <1
Total 15 10.3 70 <1 13 4
SJVAPCD Regional Threshold 10 10 100 27 15 15
Exceeds Threshold? Yes Yes No No No No
Source: CalEEMod Version 2022.1.
1 Based on trip generation data provided by Integrated Engineering Group (2026). 2 Based on calendar year 2026 emissions data.
3 Based on calendar year 2027 emissions data.
Ambient Air Quality Analysis
The SJVAPCD requires dispersion modeling for projects that result in average daily operation-related emissions that exceed the average daily emissions screening criteria of 100 pounds per day. As shown in Table 4.3-12, Average Daily Operation-Related Emissions, the project-related operation-phase activities under full buildout conditions would result in average daily emissions that would exceed the 100 pounds per day screening criteria for CO.
Table 4.3-12 Average Daily Operation-Related Emissions
Operation Phase
Criteria Air Pollutants
(pounds per day)1
VOC NOX CO SO2 PM10 PM2.5
Operation Related Emissions 80 56 385 1 73 19
SJVAPCD Ambient Air Quality Screening
Threshold 100 100 100 100 100 100
Exceeds Thresholds? No No Yes No No No
Source: CalEEMod Version 2022.1.
1 The average daily emissions are calculated by dividing the annual emissions by 365 days, which is the assumed number of workdays the project would operate annually.
In accordance with SJVAPCD methodology, because the Project would result in exceeding the ambient air quality screening threshold for CO, dispersion modeling was conducted using AERMOD, version 13.0. The calculated concentration levels associated with project operation are shown in Table 4.3-13, Ambient Air Quality Analysis Summary.
Riverview Marketplace Commercial Project
Environmental Impact Report 4.3 Air Quality
City of Bakersfield – SCH No. 2025101507 4.3-29
Table 4.3-13 Ambient Air Quality Analysis Summary
Pollutant
Averaging
Period
Background
µg/m3
Project
Operation
µg/m3
Project +
Background
NAAQS
µg/m3
CAAQS
µg/m3
NO2
1-hour 96.3 0.69 97.0 188.7 339
Annual 62.8 0.13 63.0 100 57
CO 1-hour 1,664 55.6 1,719 40,000 23,000
8-hour 916 37.4 953 10,000 10,000
SO2
1-hour 77.3 0.10 77.4 196 655
3-hour 50.0 0.09 50.1 1,300 n/a
24-hour 11.3 0.05 11.3 365 105
Annual 7.07 0.04 7.11 n/a n/a
PM10
24-hour 93.0 3.74 96.7 150 50
Annual 49.6 1.69 51.3 n/a 20
PM2.5
24-hour 37.2 1.07 38.3 35 n/a
Annual
12.90 0.48 13.38 12 12
Notes: Bold = Value exceeds either the NAAQS and/or CAAQS; Ambient air quality analysis modeling output provided in Appendix B (3&4); NAAQS = National Ambient Air Quality Standard; CAAQS = California Ambient Air Quality Standard; μg/m3 = micrograms per cubic meter As shown in Table 4.3-13, project-related operation activities would not generate emissions that would result in concentrations exceeding the ambient air quality standards for NO2 (1-hour), SO2 and CO when added to background concentrations. However, background concentrations of NO2 (Annual), PM10 and PM2.5 already exceed the AAQS. For these pollutants, the SJVAPCD has developed significant impact levels to determine whether a project’s contribution will contribute significantly to an AAQS exceedance.
Table 4.3-14, Comparison of Concentrations to Significant Impact Levels, compares the incremental increase in NO2, PM10 and PM2.5 concentrations resulting from project operations to the SJVAPCD significant impact levels. The Project’s modeled NO2, PM10 and PM2.5 concentrations are below the SJVAPCD significance levels for 24-hour and annual average concentrations.
Table 4.3-14 Comparison of Concentrations to Significant Impact Levels Pollutant
Averaging
Period
Project Operation
µg/m3
SIL
µg/m3
NO2 Annual 0.13 1.0
PM10
24-hour 3.73 10.4
Annual 1.69 2.08
PM2.5
24-hour 1.07 2.5
Annual 0.48 0.63
Note: Ambient Air Quality Analysis modeling output provided in Appendix B (3&4). SIL = significant impact level; μg/m3 = micrograms per cubic meter However, implementation of MM AQ-2 would provide onsite reductions in VOC emissions associated with coatings and paints used for the building exterior surfaces and parking lot striping.
Furthermore, implementation of MM GHG-1 through MM GHG-3 (see Section 4.9, Greenhouse Gas Emissions) could also provide VOC reductions generated from building energy use, property management landscaping equipment, and project-related vehicle trips. Table 4.3-15, Annual Regional Operation Emissions With Mitigation, shows the project-related annual emissions at full buildout with incorporation of MM AQ-2 (low VOC content paints) and MM GHG-3 (electric-powered landscaping equipment) in addition to the net change compared to the project-related annual emissions at full buildout without the mitigation measures.
Riverview Marketplace Commercial Project
Environmental Impact Report 4.3 Air Quality
City of Bakersfield – SCH No. 2025101507 4.3-30
As shown in Table 4.3-15, Annual Regional Operation Emissions With Mitigation, the Project would still exceed the SJVAPCD significance thresholds for VOC and NOX with incorporation of MM AQ-2 and MM GHG-3. However, the amount exceeded for these two criteria air pollutants would be addressed through implementation of MM AQ-1, which would require a VERA for the Project. In general, a VERA provides pound-for-pound mitigation of air pollutant emissions through a process that funds and implements emission reduction projects through the SJVAPCD emission reduction incentive grant program.
Table 4.3-15 Annual Regional Operation Emissions With Mitigation Source
Maximum Daily Emissions (tons per year)
VOC NOx CO SO2 PM10 PM2.5
Full Buildout (2027 Full Buildout Year) Without
Mitigation
Mobile1,2 13 10 68 <1 13 3
Area 1.98 0.01 1.59 9.47E-5 2.81E-3 2.13E-3
Energy <1 <1 <1 <1 <1 <1
Total 14.56 10.29 70.26 0.16 13.32 3.50
Full Buildout (2027 Full Buildout Year) With
Mitigation
Mobile1,2 13 10 68 <1 13 3
Area3 1.69 0 0 0 0 0
Energy <1 <1 <1 <1 <1 <1
Total 14.27 10.28 68.67 0.16 13.32 3.50
SJVAPCD Regional Threshold 10 10 100 27 15 15
Exceeds Threshold? Yes Yes No No No No
Net Change
Mobile 0 0 0 0 0 0
Area (0.29) (0.01) (1.59) (9.47E-5) (2.81E-3) (2.13E-3) Energy 0 0 0 0 0 0
Total (0.29) (0.01) (1.59) (9.47E-5) (2.81E-3) (2.13E-3) Source: CalEEMod Version 2022.1.
Notes: (“ “) = negative value
1 Based on trip generation data provided by Integrated Engineering Group (2026). 2 Based on calendar year 2027 emissions data.
3 Includes implementation of MM AQ-2, which requires use of paints and coatings with a VOC content of 25 grams per liter or less, and MM GHG-3 (see Section 4.9, Greenhouse Gas Emissions), which requires all landscaping equipment to be electric-powered.
Thus, implementation of MM AQ-1—in addition to compliance with the Indirect Source Review program under SJVAPCD Rule 9510—would, at minimum, offset the amount of project-related regional emissions of VOC and NOX that exceed their SJVAPCD regional significance thresholds.
As such, impacts would be less than significant with mitigation incorporated.
Mitigation Measures
In addition to the mitigation measures provided below, please also refer to MM GHG-1 through MM GHG-3 in Section 4.8, Greenhouse Gas Emissions, of this Draft EIR.
MM AQ-1 Prior to issuance of building permits, the project applicant shall enter into a Voluntary Emission Reduction Agreement (VERA) with the San Joaquin Valley Air Pollution Control District (SJVAPCD) to mitigate regional air quality impacts associated with emissions of VOC and NOX generated by operation of the proposed project. At minimum, the VERA shall be crafted and shown to mitigate project-related operation emissions to below the SJVAPCD regional significance thresholds for VOC and NOX. Prior to the issuance of building permits, the project applicant shall provide documentation to the City of Bakersfield Development Services Department (City), that verifies, to the City’s satisfaction, completion of the VERA.
Riverview Marketplace Commercial Project
Environmental Impact Report 4.3 Air Quality
City of Bakersfield – SCH No. 2025101507 4.3-31
MM AQ-2 The project proponent/developer shall use paints and coatings with a VOC content of 25 grams per liter or less for all initial and future exterior coating and recoating of structures including parking lot striping. This reduced VOC content requirement shall be incorporated into all site plans and appropriate construction documents (e.g., construction management plan) and submitted to the City of Bakersfield Development Services Department.
Level of Significance After Mitigation
Less than significant with mitigation incorporated.
Threshold AQ-3: Would the project expose sensitive receptors to substantial pollutant concentrations?
Impact Analysis
Construction and operation of the Project could generate new sources of criteria air pollutants and TACs. The following describes potential localized air quality impacts from implementation of the Project to the nearby off-site sensitive receptors.
Operational Phase Health Risks to Off-Site Receptors
The types of land uses that typically generate substantial quantities of TACs are industrial (permitted stationary sources) and warehousing (truck idling) land uses. These types of major air pollutant emissions sources are not proposed under the Project. The Project would develop retail and commercial (e.g., medical office, self-storage, and health club) land uses. Operation of the proposed uses could include occasional use of landscaping equipment and natural gas consumption for heating. However, air pollutant emissions generated from these activities would be nominal.
The Project would include a gas station with up to 40 fuel dispensers. CARB recommends avoiding siting gas stations within 500 feet of sensitive land uses to avoid exposing sensitive receptors to substantial concentration of air pollutants. The nearest potential sensitive land uses to the proposed gas station would be the two buildings across El Toro Viejo Road, approximately 650 feet to the west, which would be outside the 500-foot buffer. Furthermore, emissions of TACs from stationary sources that may be associated with the proposed uses (e.g., restaurant chain-driven char broiler), including the proposed gas station, would be subject to further study and health risk assessment prior to the issuance of any necessary air quality permits under SJVAPCD Regulation II. Regulation II would ensure that stationary source emissions (permitted sources) would be reduced or mitigated below SJVAPCD significance thresholds of 20 in one million cancer risk and one for acute risk at the maximally exposed individual.
In addition to stationary sources, the Project could generate heavy-duty trucks associated with the delivery of goods and supplies to the proposed retail and commercial uses, which would result in heavy-duty truck travel along the local roadways.
Per City of Bakersfield Municipal Code Section 10.44.060, Truck Routes Established—Signs— Parking Restrictions, Rosedale Highway and Coffee Road are designated truck routes. Based on the Project Site location, it is anticipated that any project-related heavy-duty truck travel would primarily occur on these two roadways. Per CARB land use siting guidelines, it is recommended to avoid siting sensitive land uses within 500 feet of urban roadways and freeways with 100,000 vehicles per day, or rural roads with 50,000 vehicles per day to avoid exposing sensitive receptors to substantial concentration of air pollutants. Overall, while the Project could generate heavy- Riverview Marketplace Commercial Project
Environmental Impact Report 4.3 Air Quality
City of Bakersfield – SCH No. 2025101507 4.3-32
duty truck travel along the local roadways, the Project would only incrementally increase average daily trips for all vehicle types (i.e., passenger vehicles, heavy-duty trucks, etc.) by up to 5,934 average daily trips along the local roadways.
Because the Project would not have any warehousing uses and would primarily consist of retail, restaurant, and commercial uses, it anticipated that project-related traffic volumes would primarily consist of passenger vehicles associated with patrons. Thus, the incremental increase in vehicle trips that could result from implementation of the proposed Project would be below roadway volumes identified by the CARB land use siting screening criteria to avoid exposing sensitive receptors to substantial concentration of air pollutants from vehicles traveling along roadway.
Therefore, operation of the Project would not expose nearby off-site sensitive receptors to substantial concentrations of TACs. Impacts would be less than significant.
CO Hotspots
Areas of vehicle congestion have the potential to create pockets of CO called hotspots. These pockets have the potential to exceed the State 1-hour standard of 20 ppm or the 8-hour standard of 9.0 ppm. Because CO is produced in greatest quantities from vehicle combustion and does not readily disperse into the atmosphere, adherence to AAQS is typically demonstrated through an analysis of localized CO concentrations. Hotspots are typically produced at intersections, where traffic congestion is highest because vehicles queue for longer periods and are subject to reduced speeds. However, emissions from motor vehicles, the largest source of CO emissions, have been declining since 1985, despite increases in VMT, due to the introduction of new automotive emission controls and fleet turnover.
Furthermore, under existing and future vehicle emission rates, a project would have to increase traffic volumes at a single intersection to more than 44,000 vehicles per hour—or 24,000 vehicles per hour where vertical and/or horizontal air does not mix—in order to generate a significant CO impact. Buildout of the Project would generate up to 1,183 peak-hour trips. Overall, implementation of the Project would result in overall peak hour turning volumes between 352 to 6,865 for the intersections considered in the traffic study and would not produce the volume of traffic required to generate a CO hotspot. Therefore, implementation of the Project would not have the potential to substantially increase CO hotspots at intersections in the vicinity of the Project Site. Impacts would be less than significant.
Construction Health Risks to Off-Site Receptors
Project-related construction activities would temporarily elevate concentrations of TACs and DPM in the vicinity of sensitive land uses. The primary sources of TACs and DPM would be exhaust generated from construction off-road equipment and construction vendor and haul-truck trips. The proposed Project would be developed in two development phases over an approximately 16- month duration from March 2026 to July 2027. The estimated excess lifetime cancer risk and chronic noncancer hazard index at the nearest sensitive receptors are shown in Table 4.3-16, Construction Risk Summary.
Table 4.3-16 Construction Risk Summary
Receptor
Cancer Risk (per
million) Chronic Hazards
Maximum Exposed Individual Resident 1.5 0.003
Maximum Exposed Individual Worker 0.3 0.031
SVJAPCD Significance Thresholds 20 1.0
Exceeds Threshold? No No
Riverview Marketplace Commercial Project
Environmental Impact Report 4.3 Air Quality
City of Bakersfield – SCH No. 2025101507 4.3-33
Note: Cancer risk calculated using 2015 OEHHA HRA guidance (OEHHA 2015).
The results of the HRA are based on the maximum modeled receptor concentration over the construction exposure period, conservatively assuming a 24-hour per day outdoor exposure and averaged over a 70-year lifetime.
As shown in Table 4.3-16, the maximum incremental cancer risk levels during the construction phase of the Project at the Maximum Exposed Individual Resident (MEIR) and Maximum Exposed Individual Worker (MEIW) are 1.5 per million and 0.3 per million, respectively, which would not exceed the cancer risk significance threshold of 20 in one million. For noncarcinogenic effects, the hazard index identified for each toxicological endpoint totaled less than one for the MEIR and MEIW. Therefore, chronic noncarcinogenic hazards are within acceptable limits, and project-related construction activities would not expose nearby sensitive receptors to substantial pollutant concentrations. Impacts would be less than significant.
Mitigation Measures
None required.
Level of Significance After Mitigation
Less than significant with no mitigation required.
Threshold AQ-4: Would the project result in other emissions (such as those leading to odors) adversely affecting a substantial number of people? Impact Analysis
The type of facilities that are considered to have objectionable odors include wastewater treatment plants, compost facilities, landfills, solid waste transfer stations, fiberglass manufacturing facilities, paint/coating operations (e.g., auto body shops), dairy farms, petroleum refineries, asphalt batch plants, chemical manufacturing, and food manufacturing facilities. The uses proposed by the Project do not fall within these land uses.
During project-related construction activities, construction equipment exhaust and application of asphalt and architectural coatings would temporarily generate odors. However, any construction-related odor emissions would be temporary and intermittent. Additionally, noxious odors would be confined to the immediate vicinity of the construction equipment. By the time such emissions reached any sensitive receptor, they would be diluted to well below any level of air quality concern.
Furthermore, short-term construction-related odors are expected to cease upon the drying or hardening of odor-producing materials. Thus, overall, construction and operation of the Project are not expected to generate odors that would adversely affect a substantial number of people.
Impacts would be less than significant.
Mitigation Measures
None required.
Level of Significance After Mitigation
Less than significant with no mitigation required.
Riverview Marketplace Commercial Project
Environmental Impact Report 4.3 Air Quality
City of Bakersfield – SCH No. 2025101507 4.3-34
Cumulative Impacts
Impact Analysis
In accordance with SJVAPCD’s methodology, any project that produces a significant project-level regional air quality impact in an area that is in nonattainment contributes to the cumulative impact.
The greatest source of emissions in the SJVAB is mobile sources. Due to the extent of the area potentially impacted from cumulative emissions (i.e., the SJVAB), SJVAPCD considers a project cumulatively significant when project-related emissions exceed the SJVAPCD regional emissions thresholds shown in Table 4.3-4.
Construction
The SJVAB is designated nonattainment for O3 and PM2.5 under the California and National AAQS, and nonattainment for PM10 under the California AAQS. Construction of cumulative projects will further degrade the regional and local air quality. Air quality will be temporarily impacted during construction activities. However, construction emissions associated with the proposed Project would not exceed the SJVAPCD’s regional construction emissions thresholds.
Therefore, the project’s contribution to cumulative air quality impacts would be less than cumulatively considerable.
Operation
For operational air quality emissions, any project that does not exceed or can be mitigated to less than the daily regional threshold values is not considered by the SJVAPCD to be a substantial source of air pollution and does not add significantly to a cumulative impact. Incorporation of MM AQ-1, which would require the Project applicant to enter into a VERA with the SJVAPCD, would, at minimum, offset the amount of project-operation-related regional emissions of VOC and NOX that exceed their SJVAPCD regional significance thresholds. Furthermore, with implementation of mitigation measures, the proposed Project would be consistent with regional plans to reduce air pollution. Therefore, the Project’s operational phase air pollutant emissions would not be cumulatively considerable. Level of Significance After Mitigation Impacts related to air quality would be less than significant.
Mitigation Measures
No mitigation measures are required as impacts would be less than significant.
Level of Significance After Mitigation
Not applicable. Project-specific impacts would be less than significant and there would be no cumulative impacts related to aesthetics.
City of Bakersfield – SCH No. 2025101507 4.4-1
4.4 Biological Resources
This section discusses impacts associated with the potential for the proposed Riverview Market Commercial Project (Project) to result in adverse impacts to biological resources, including special-status species, riparian habitats, sensitive natural communities, protected wetlands, and migratory or wildlife movement corridors. This section also discusses the Project’s consistency with local plans and ordinances that protect biological resources. The analysis is based on a review of the relevant regulatory setting, existing conditions, and a discussion of the thresholds used to determine whether the Project would result in significant impacts to biological resources.
Information in this section is based, in part, on the Metropolitan Bakersfield General Plan (General Plan), the City of Bakersfield (City) Municipal Code (BMC) Title 17 (Zoning Ordinance), and a General Biological Assessment (GBA) dated May 2026, prepared for the Project by Hernandez Environmental Services (HES), and included in Appendix C, General Biological Assessment, to this Draft EIR.
During the scoping period for the Project’s Environmental Impact Report (EIR), comments were received in response to the Notice of Preparation (NOP) regarding biological resources. These comments are included in Appendix A-2, Notice of Preparation Comments, of this Draft EIR and are summarized below and addressed throughout this section:
• Request for preparation of a biological assessment including database search and field surveys to determine if special-status species are located on the Project Site. • Request for analysis for potential special-status animal species on the Project Site, including the San Joaquin kit fox, Swainson’s hawk, western burrowing owl, Crotch’s bumble bee, American badger, Bakersfield legless lizard, and the western spadefoot toad. • Recommendation to implement mitigation for pre-construction surveys, buffers, etc. for potential special-status animal species on the Project Site, including the San Joaquin kit fox, Swainson’s hawk, western burrowing owl, Crotch’s bumble bee, American badger, Bakersfield legless lizard, and the western spadefoot toad. • Recommendation to implement mitigation for nesting birds. • Request to include a Project alternative to avoid impacts to biological resources. • Recommendation to confirm California Natural Diversity Database (CNDDB) records results for the Project with a field survey on the Project Site. • Comment noting filing fees required by the California Department of Fish and Wildlife (CDFW).
4.4.1 Regulatory Setting
Federal
Federal Endangered Species Act of 1973
The Federal Endangered Species Act (FESA) (16 U.S.C. § 1531 et seq.) provides for the listing of endangered and threatened plant and animal species and the designation of critical habitat for these listed species. Section 09 of the FESA regulates the “taking” of any endangered fish or wildlife species. Section 7 of the FESA requires federal agencies to consult with the U.S. Fish and Wildlife Service (USFWS) or National Marine Fisheries Service (NMFS) to ensure that their Riverview Marketplace Commercial Project
Environmental Impact Report 4.4 Biological Resources
City of Bakersfield – SCH No. 2025101507 4.4-2
actions will not adversely impact listed species or modify designated critical habitat. Consultation results in the USFWS issuing a concurrence letter stating that a federal action would not harm a listed species or a biological opinion (BO) that identifies the limits of any “take” of a listed species due to the federal action. Section 7 of the FESA provides for permitting of projects where interagency cooperation is necessary to ensure that a federal action/decision does not jeopardize the existence of a listed species. Section 10 of the FESA applies to non-federal parties and private landowners and provides for issuance of incidental take permits in conjunction with the development of habitat conservation plans (HCPs).
Migratory Bird Treaty Act
The Migratory Bird Treaty Act of 1918 (MBTA)(16 U.S.C. §703 et seq.) implemented treaties with several countries on the conservation and protection of migratory birds. The number of bird species covered by the MBTA is extensive and is listed at 50 Code of Federal Regulations (CFR) Part 10.13. USFWS enforces the MBTA, which prohibits “by any means or in any manner, to pursue, hunt, take, capture, [or] kill” any migratory bird, or attempt such actions, except as permitted by regulation.
Clean Water Act
Pursuant to Section 404 of the Clean Water Act (CWA)(33 U.S.C. §§ 1251-1387), the U.S. Army Corps of Engineers (USACE) is authorized to regulate any activity that would result in the discharge of dredged or fill material into waters of the U.S. (including wetlands), which includes those waters listed in 33 CFR § 328.3 (as amended at 80 Federal Register [FR] 37104, June 29, 2015).
The USACE, with oversight from the U.S. Environmental Protection Agency (USEPA), has the principal authority to issue CWA Section 404 permits. The USACE would require a Standard Individual Permit for more than minimal impacts to waters of the U.S. as determined by the USACE. Projects with minimal individual and cumulative adverse effects on the environment may meet the conditions of an existing Nationwide Permit or Regional General Permit.
A water quality certification or waiver pursuant to Section 401 of the CWA is required for all Section 404 permitted actions. The Regional Water Quality Control Board (RWQCB), a division of the State Water Resources Control Board (SWRCB), provides oversight of the Section 401 certification process in California. The RWQCB is required to provide “certification that there is reasonable assurance that an activity that may result in the discharge to waters of the United States will not violate water quality standards.” Water Quality Certification must be based on the finding that a proposed discharge will comply with applicable water quality standards.
National Pollutant Discharge Elimination System
The National Pollutant Discharge Elimination System (NPDES) is the permitting program for discharge of pollutants into surface waters of the U.S. under Section 402 of the CWA. This federal program has been delegated to the State of California for implementation through the SWRCB and the nine RWQCBs.
State
California Endangered Species Act
The California Endangered Species Act (CESA)(FGC, Sections 2050 – 2089.25), in combination with the California Native Plant Protection Act of 1977 (NPPA)(FGC §1900 et seq.), regulates the Riverview Market Commercial Project
Environmental Impact Report 4.4 Biological Resources
City of Bakersfield – SCH No. 2025101507 4.4-3
listing and take of plant and animal species designated as endangered, threatened, or rare within the state. California also lists species of special concern (CSSC) based on limited distribution, declining populations, diminishing habitat, or unusual scientific, recreational, or educational value.
CESA defines an endangered species as “a native species or subspecies of a bird, mammal, fish, amphibian, reptile, or plant which is in serious danger of becoming extinct throughout all, or a significant portion, of its range due to one or more causes, including loss of habitat, change in habitat, overexploitation, predation, competition, or disease.” The CESA defines a threatened species as “a native species or subspecies of a bird, mammal, fish, amphibian, reptile, or plant that, although not presently threatened with extinction, is likely to become an endangered species in the foreseeable future in the absence of the special protection and management efforts required by this chapter. Any animal determined by the California Fish and Game Commission (CFGC) as rare on or before January 1, 1985 is a threatened species.” Candidate species are defined as “a native species or subspecies of a bird, mammal, fish, amphibian, reptile, or plant that the commission has formally noticed as being under review by the department for addition to either the list of endangered species or the list of threatened species, or a species for which the CFGC has published a notice of proposed regulation to add the species to either list.” Candidate species may be afforded temporary protection as though they were already listed as threatened or endangered at the discretion of the CFGC. Unlike the FESA, the CESA does not list invertebrate species.
Sections 2080 through 2085 of CESA address the take of threatened, endangered, or candidate species by stating “no person shall import into this state, export out of this state, or take, possess, purchase, or sell within this state, any species, or any part or product thereof, that the commission determines to be an endangered species or a threatened species, or attempt any of those acts, except as otherwise provided.” Under CESA, “take” is defined as to “hunt, pursue, catch, capture, or kill, or attempt to hunt, pursue, catch, capture, or kill.” Exceptions authorized by the State to allow “take” require permits or memoranda of understanding and can be authorized for endangered species, threatened species, or candidate species for scientific, educational, or management purposes and for take incidental to otherwise lawful activities. FGC Sections 1901 and 1913 provide that notification is required prior to disturbance. CDFW is responsible for assessing development projects for their potential to impact listed species and their habitats.
State-listed species are addressed through the issuance of a 2081 Permit (Memorandum of Understanding).
California Environmental Quality Act
The California Environmental Quality Act (CEQA)(Pub. Res. Code Sections 21000–21189) was established in 1970 as California’s counterpart to the National Environmental Policy Act (NEPA) (42 USC § 4321 et seq.). This statute requires State and local agencies to identify significant environmental impacts related to their actions and to avoid or mitigate those impacts, where feasible.
A public agency must comply with CEQA when it undertakes an activity defined by CEQA as a "project." A project is an activity undertaken by a public agency or a private activity subject to discretionary approval from a government agency that may cause either a direct physical change in the environment or a reasonably foreseeable indirect change in the environment.
California Fish and Game Code Sections 1600-1602
Pursuant to Section 1602 of the FGC, the CDFW regulates all diversions, obstructions, or changes to the natural flow or bed, channel, or bank of any river, stream, or lake that supports Riverview Marketplace Commercial Project
Environmental Impact Report 4.4 Biological Resources
City of Bakersfield – SCH No. 2025101507 4.4-4
fish or wildlife. A Notification of Lake or Streambed Alteration must be submitted to CDFW for “any activity that may substantially divert or obstruct the natural flow or substantially change the bed, channel, or bank of any river, stream, or lake.” The CDFW has jurisdiction over riparian habitats associated with watercourses and wetland habitats supported by a river, lake, or stream.
Jurisdictional waters are delineated by the outer edge of riparian vegetation (i.e., drip line) or at the top of the bank of streams or lakes, whichever is wider. CDFW jurisdiction does not extend to tidal areas or isolated resources. CDFW reviews the proposed actions and, if necessary, submits (to an applicant) a proposal that includes measures to protect affected fish and wildlife resources.
The final proposal that is mutually agreed upon by the CDFW and an applicant is the Lake or Streambed Alteration Agreement.
California Fish and Game Code Sections 3503, 3511, 3513, 3800, 4700, 5050, and 5515 In California, fish, wildlife, and native plant resources are protected and managed by the CDFW.
The CFGC and/or CDFW are responsible for issuing permits for the take or possession of protected species. The following sections of the CFGC address protected species: Section 3511 (birds), Section 4700 (mammals), Section 5050 (reptiles and amphibians), and Section 5515 (fish). In addition, the protection of birds of prey is provided for in Sections 3503, 3513, and 3800 of the FGC.
Porter-Cologne Water Quality Control Act
The Porter-Cologne Act (Water Code, Division 7) provides for statewide coordination of water quality regulations. The SWRCB was established as the statewide authority and nine separate RWQCBs were developed to oversee water quality on a day-to-day basis. The SWRCB is the primary agency responsible for protecting water quality in California. As discussed above, the RWQCBs regulate discharges to surface waters under the CWA. In addition, the RWQCBs are responsible for administering the Porter-Cologne Act.
Pursuant to the Porter-Cologne Act, the State is given authority to regulate waters of the state, which are defined as any surface water or groundwater, including saline waters. As such, any person proposing to discharge waste into a water body that could affect its water quality must first file a Report of Waste Discharge if section 404 of the CWA is not required for the activity. “Waste” is partially defined as any waste substance associated with human habitation, including fill material discharged into water bodies.
California Native Plant Protection Act
The NPPA was enacted in 1997 and allows the designation of plants as rare and endangered by the California Fish and Game Commission. The NPPA also prohibits the take of endangered or rare native plants, with some exceptions, including agricultural and nursery operations; emergencies; and after proper notification to CDFW for removal of vegetation in canals, roads, and other sites and changes in land use. There are 64 species, subspecies, and varieties of plants that are protected as rare under the NPPA.1
1 California Department of Fish and Wildlife (CDFW). 2026. California Laws Protecting Native Plants: California Native Plant Protection Act. Available at:
https://wildlife.ca.gov/Conservation/Plants/Laws#:~:text=The%20Native%20Plant%20Program%20coordinates,the%20significant%2 0impacts%20they%20identify. Accessed February 2026.
Riverview Market Commercial Project
Environmental Impact Report 4.4 Biological Resources
City of Bakersfield – SCH No. 2025101507 4.4-5
Local
Metropolitan Bakersfield General Plan
The General Plan, dated December 2002, was updated in January 2016 per Resolution No. 018- 16 and 019-16. At the time this EIR was published for public review, the City was in the process of updating its Bakersfield 2045 General Plan, but it had not yet been adopted. The General Plan includes goals, policies, and directions to achieve the City’s vision of the community and future development. The General Plan includes 12 elements that focus on: Land Use; Circulation; Housing; Conservation; Noise; Safety; Downtown Redevelopment; Public Services Facilities; Parks; Kern River Plan; and Historical Resources.
The General Plan established the following goals, policies, and implementation programs in order to protect the City’s biological resources. At the end of each policy is listed in parentheses a code beginning with the letter “I” followed by a number. This code refers to the pertinent implementing program. The relevant implementing programs are also included below.
Conservation Element
CON/BR-G-1 Conserve and enhance Bakersfield’s biological resources in a manner which facilitates orderly development and reflects the sensitivities and constraints of these resources.
CON/BR-G-2 To conserve and enhance habitat areas for designated “sensitive” animal and plant species.
CON/BR-P-1 Direct development away from “sensitive biological resource” areas, unless effective mitigation measures can be implemented (I-1, I-3, I-4).
CON/BR-P-2 Preserve areas of riparian vegetation and wildlife habitat within floodways along rivers and streams, in accordance with the Kern River Plan Element and channel maintenance program designed to maintain flood flow discharge capacity (I-4).
CON/BR-P-3 Discourage, where appropriate, the use of off-road vehicles to protect designated sensitive biological and natural resources (I-2).
CON/BR-P-4 Determine the feasibility of enhancing sensitive biological habitat and establishing additional wildlife habitat in the study area with State and/or Federal assistance (I-3).
CON/BR-P-5 Determine the locations and extent of suitable habitat areas required for the effective conservation management of designated “sensitive” plant and animal species (I-3).
City of Bakersfield Land Use Zoning Ordinance
The City’s Zoning Ordinance is included in Title 17 of the Bakersfield Municipal Code. The Zoning Ordinance implements the goals and policies of the General Plan, which serve to promote and protect the public health, safety, peace, morals, comfort, convenience and general welfare. The Zoning Ordinance assists in providing a definite plan of development for the City and to guide, control and regulate the future growth of the city in accordance with the General Plan. The Zoning Ordinance also is intended to protect the established character and the social and economic stability of agricultural, residential, commercial, industrial and other areas within the City, and to assure the orderly and beneficial development of such areas.
Riverview Marketplace Commercial Project
Environmental Impact Report 4.4 Biological Resources
City of Bakersfield – SCH No. 2025101507 4.4-6
Metropolitan Bakersfield Habitat Conservation Plan
The goal of the Metropolitan Bakersfield Habitat Conservation Plan (MBHCP) was to acquire, preserve, and enhance native habitats which support endangered and sensitive species, while allowing urban development to proceed as set forth in the General Plan. The Plan Area of the MBHCP included both the City and County of Kern (County) jurisdictions. The MBHCP was required to meet the requirements of both the FESA and CESA as well as comply with State and federal environmental regulations set forth in NEPA and CEQA.2 As of January 1, 2023, the Project Site is currently not within any state or federal Habitat Conservation Plans. The MBHCP and associated Incidental Take Permit (ITP) expired on January 1, 2023. As such, the City no longer acts as a permittee for projects that were approved/permitted after Friday, December 30, 2022. Urban development permits issued after the 2023 expiration date are required to comply directly with the requests of USFWS and the CDFW.
Any project approved prior to January 1, 2023, was required to be under the MBHCP and associated ITP until the expiration date of June 1, 2023. To ensure take of covered species does not occur after the expiration date, fees were required to be paid no later than January 1, 2023, and all covered activities were required to be completed by the MBHCP expiration date of June 1, 2023.
4.4.2 Environmental Setting
The Environmental Setting for the Project’s biological resources is supported by the GBA prepared by HES and dated November 2025 (Appendix C).
Regional Setting
The City is located within a region of broad arid plains within the County. Due to the area’s low and infrequent rainfall and generally little topographic relief, the predominant vegetation and wildlife within the City have adapted to an arid climate. Grasslands and scrublands had historically covered the entire City. Localized depressions where rainwater collects often harbor unique plant life.
Existing Site Conditions
The Project Site consists primarily of non-vegetation and is entirely categorized as a disturbed ruderal area habitat type with paved sidewalks along the edges. The Project Site also consists of unvegetated roadways and some areas with little to no vegetation. If vegetation is present, the dominant species are downy chess (Bromus tectorum) and tumbleweed (Salsola tragus). Other plant species observed include red brome (Bromus rubens), California croton (Croton californicus), and silverleaf nightshade (Solanum elaeagnifolium).3 Additionally, the Project Site is not located within any designated federal critical habitat. 2 City of Bakersfield. 1994. Metropolitan Bakersfield Habitat Conservation Plan, S. Summary. Available at:
https://docs.bakersfieldcity.us/weblink/0/edoc/625001/Metropolitan%20Bakersfield%20Habitat%20Conservation%20Plan.pdf.
Accessed February 2026.
3 City of Bakersfield. 1994. Metropolitan Bakersfield Habitat Conservation Plan, S. Summary. Available at:
https://docs.bakersfieldcity.us/weblink/0/edoc/625001/Metropolitan%20Bakersfield%20Habitat%20Conservation%20Plan.pdf.
Accessed February 2026.
Riverview Market Commercial Project
Environmental Impact Report 4.4 Biological Resources
City of Bakersfield – SCH No. 2025101507 4.4-7
Special-Status Species
Special-status species are those wildlife and plant species that warrant special consideration during the CEQA process. These include the following:
• Officially designated “threatened,” “endangered,” or “candidate” species federally listed by the USFWS and protected under the FESA;
• Officially designated “rare,” “threatened,” “endangered,” or “candidate” species state-listed by the CDFW and protected under the CESA. CDFW also maintains a list of “Fully Protected” species as well as CSSC that are also generally treated as special-status species under CEQA;
• Species considered rare, threatened, or endangered under the conditions of Section 15380 of the CEQA Guidelines, such as plant species identified on lists 1A, 1B, and 2 in the California Native Plant Society Inventory of Rare and Endangered Vascular Plants of California (CNPS Inventory), which may include species not found on either state or federal endangered species list; and
• Other species considered sensitive, such as birds protected under the MBTA.
The General Biological Assessment (GBA) includes the results of database searches for species that are listed or candidates for listing by USFWS, CDFW, and CNPS. The CNDDB was also queried. A total of 18 sensitive species of plants and 29 sensitive species of animals have the potential to occur on or within the vicinity of the Project Site, for a total of 47 sensitive species.
These species are identified in Appendix B of the GBA.
Of the 47 sensitive species identified in the database searches, 12 plant species and 10 wildlife species are listed as Candidate, Rare, Threatened, or Endangered under the state and federal Endangered Species laws or directed to be evaluated under other state, county, or municipal regulations, which are further discussed below. Additionally, all habitats utilized by these species were evaluated during the November 2025 field survey of the Project Site and the GBA contains a determination for the presence or probability of presence of these species.
Additionally, as described in Appendix A of the GBA, there were 10 other species without special-status observed during the November 2025 field visit.
Special-Status Plants
A total of 12 plants species are listed as State and/or federal Threatened, Endangered, Candidate, or 1B.1 listed plants on the CNPS Rare Plant Inventory with the potential to occur on the Project Site or in the Project vicinity. Plants with a California Rare Plant Rank (CRPR) of 1B.1 are rare, threatened, or endangered in California and elsewhere, and are critically threatened in California (over 80% of occurrences are threatened or high threat). These plants are generally endemic to California and are eligible for state listing.4 Table 4.4-1, Threatened, Endangered, Candidate, or 1B.1 Ranked Plant Species, includes the plant common and scientific names, its status, whether a habitat for the species is present on the Project Site, and whether the species itself is present on the Project Site. As shown below, the Project Site does not include suitable 4 California Native Plant Society. 2026. California Rare Plant Ranks webpage. Available at: https://www.cnps.org/rare- plants/california-rare-plant-ranks#:~:text=Plants%20with%20a%20California%20Rare%20Plant%20Rank%20of%201B%20are,) %20and/or%20%C2%A715380. Accessed February 2026.
Riverview Marketplace Commercial Project
Environmental Impact Report 4.4 Biological Resources
City of Bakersfield – SCH No. 2025101507 4.4-8
habitat for any of the special-status plant species identified and none were present on the Project Site.
Table 4.4-1 – Threatened, Endangered, Candidate, or 1B.1 Ranked Plant Species Common Name Scientific Name Status
Habitat for
specifies on
Project Site?
Species
present on
Project Site?
1 Horn’s milk-vetch Astragalus hornii
var. hornii)
1B.1 in the CNPS
inventory
No No
2 Bakersfield
smallscale
Atriplex tularensis Endangered (State); 1A in
the CNPS inventory
No No
3 Californiajewelflower Caulanthus
californicus
Endangered (federal);
state Endangered (State);
1B.1 in the CNPS
inventory
No No
4 Hispid salty bird's-beakChloropyron molle
ssp. hispidum
1B.1 in the CNPS
inventory
No No
5 Kern mallow Eremalche parryi
ssp. kernensis
Endangered (State); 1B.2
in the CNPS inventory
No No
6 Tejon poppy Eschscholzia
lemmonii ssp.
kernensis
1B.1 in the CNPS
inventory
No No
7 Comanche point layia Layia leucopappa 1B.1 in the CNPS inventory
No No
8 San Joaquin
woollythreads
Monolopia
congdonii
Endangered (federal);
1B.2 in the CNPS
inventory
No No
9 Piute Mountains
navarretia
Navarretia
setiloba
1B.1 in the CNPS
inventory
No No
10 Bakersfield cactus Opuntia basilaris
var. treleasei
Endangered (federal);
Endangered (State); 1B.1
in the CNPS inventory
No No
11 Oil neststraw Stylocline
citroleum
1B.1 in the CNPS
inventory
No No
12 Mason's neststraw Stylocline masonii 1B.1 in the CNPS inventory
No No
Source: Hernandez Environmental Services, 2025.
Special-Status Wildlife
A total of ten wildlife species is listed as State and/or federal Threatened, Endangered, or Candidate species have a potential to occur on the Project site or within the Project vicinity are identified below in Table 4.4-2, Threatened, Endangered, or Candidate Wildlife Species. All sensitive species within a five-mile radius of Project Site were reviewed and a complete list of those species are discussed in Appendix B of the GBA. However, only those identified to occur within the Project Area which included a 500-foot buffer around the Project Site was evaluated in the GBA and are included in Table 4.4-2. The buffer around surveyed included accessible areas (areas that were not fenced off by security fencing) that abut the Project Site to the south and west. Notably, the American badger, Bakersfield leg-less lizard, and the westerns spade foot, and burrowing owl are not identified to occur within the Project Area.
Table includes the wildlife common and scientific names, its status, whether a habitat for the species is present on the Project Site, and whether the species itself is present on the Project Site. As shown below, the Project Site does not include suitable habitat for any of the special-status plant species identified and none were present on the Project Site.
Riverview Market Commercial Project
Environmental Impact Report 4.4 Biological Resources
City of Bakersfield – SCH No. 2025101507 4.4-9
Table 4.4-2 – Threatened, Endangered, or Candidate Wildlife Species Common Name Scientific Name Status
Habitat for
specifies on
Project Site?
Species
present on
Project Site?
1 Tricolored blackbird Agelaius tricolor Candidate
Endangered
(State); CSSC
No No
2 Nelson's (San
Joaquin) antelope
squirrel
Ammospermophilus
nelsoni
Threatened (State) No No
3 Crotch bumble bee Bombus crotchii Candidate
Endangered (State)
No No
4 Swainson’s hawk Buteo swainsoni Threatened (State) No No 5 Monarch - California
overwintering
population
Danaus plexippus
pop.1
Candidate Species
(federal)
No No
6 Valley elderberry
longhorn beetle
Desmocerus
californicus dimorphus
Threatened (State) No No
7 Tipton kangaroo rat Dipodomys nitratoides
nitratoides
Endangered
(federal);
Endangered (State)
No No
8 Blunt-nosed leopard
lizard
Gambelia sila Endangered
(federal);
Endangered (State)
No No
9 Buena Vista Lake
ornate shrew
Sorex ornatus relictus Threatened
(federal); CSSC
No No
10 San Joaquin kit fox Vulpes macrotis mutica Endangered (federal);
Threatened (State)
No No
Source: Hernandez Environmental Services, 2025.
Nesting Birds
As discussed above, migratory non-game native bird species are protected under the federal MBTA. Additionally, Sections 3503, 3503.5, and 3513 of the California Fish and Game Code. The Project Site has shrubs that can be used by nesting songbirds during the nesting bird season of February 1 to September 15.
Wildlife Movement Corridors
Wildlife movement corridors link together areas of suitable habitat that are otherwise separated by rugged terrain, changes in vegetation, or human disturbances. The Project Site was evaluated for its function as a wildlife corridor that species would use to move between wildlife habitat zones.
Usually, mountain canyons or riparian corridors are used by wildlife as corridors. The Project Site is relatively flat and does not contain mountain canyons or riparian corridors nearby. Furthermore, the site is blocked off on the east end by railroad tracks and a residential area to the west. No wildlife movement corridors were found to be present on the Project Site.
Jurisdictional Waters and Wetlands
No federal or jurisdictional streams occur on the Project Site. Based on a review of the Project Site’s aerial images and as observed during the field visit, an underground stormwater feature was identified near the east border of the Project Site. This stormwater feature carries water that flows from four culverts to the southeast of the Project Site from south to north. However, This feature does not qualify as state or federal jurisdictional waters.
Riverview Marketplace Commercial Project
Environmental Impact Report 4.4 Biological Resources
City of Bakersfield – SCH No. 2025101507 4.4-10
4.4.3 Impact Analysis
Methodology
As described above, the analysis in this section in based, in part, on a GBA prepared for the Project (Appendix C). The purpose of the GBA is to document the presence or absence of sensitive resources that may be present on the Project Site, to document existing habitats, and generally address biological questions that may be needed for Project approval. The GBA includes results obtained from the November 13, 2025, field survey and as well as recommendations that may be needed to mitigate potential biological impacts from project activities. The field survey included the entire Project Site which was walked in linear transects approximately 50 feet apart for 100 percent coverage of the Project Site.
Literature Review
The CBA included a literature review and reviewed aerial photographs and topographic maps of the Project Site and surrounding areas. The following United State Geological Survey (USGS) quads were used to query the CNDDB: Oildale, Rosedale, Famoso, North of Oildale, Knob Hill, Oil Center, Lamont, Gosford, and Stevens. The USFWS County Endangered Species Lists, and CNPS's rare plant lists were reviewed to obtain species information for the Project Site and its surrounding area. The potential for these species to be affected by the Project was evaluated qualitatively.
Field Survey
On November 13, 2025, HES conducted a field survey of the Project Site. The purpose of the field survey was to document the existing habitat conditions, obtain plant and animal species information, view the surrounding uses, assess the potential for state and federal waters, assess the potential for wildlife movement corridors, and assess for the presence of critical habitat constituent elements.
Thresholds of Significance
The City utilizes the California Environmental Quality Act (CEQA) Guidelines, Appendix G, and thresholds of significance5to analyze the environmental impacts of the Project. Per CEQA Guidelines, an impact is considered significant if the Project would:
• Have a substantial adverse effect, either directly or through habitat modifications, on any species identified as a candidate, sensitive, or special status species in local or regional plans, policies, or regulations, or by the California Department of Fish and Wildlife or U.S.
Fish and Wildlife Service.
• Have a substantial adverse effect on any riparian habitat or other sensitive natural community identified in local or regional plans, policies, regulations or by the California Department of Fish and Wildlife or U.S. Fish and Wildlife Service. • Have a substantial adverse effect on state of federally protected wetlands (including, but not limited to, marsh, vernal pool, coastal, etc.) through direct removal, filling, hydrological interruption, or other means.
5 Association of Environmental Professionals (AEP). 2025. CEQA Guidelines Appendices, Appendix G: Environmental Checklist Form. Available at: https://www.califaep.org/docs/CEQA_Handbook_2025combined.pdf. Accessed January 2026.
Riverview Market Commercial Project
Environmental Impact Report 4.4 Biological Resources
City of Bakersfield – SCH No. 2025101507 4.4-11
• Interfere substantially with the movement of any native resident or migratory fish or wildlife species or with established native resident or migratory wildlife corridors, of impede the use of native wildlife nursery sites.
• Conflict with any local policies or ordinances protecting biological resources, such as a tree preservation policy or ordinance.
• Conflict with the provisions of an adopted Habitat Conservation Plan, Natural Community Conservation Plan, or other approved local, regional, or state habitat conservation plan.
Project Impacts
Threshold BIO-1: Would the project have a substantial adverse effect, either directly or through habitat modifications, on any species identified as a candidate, sensitive, or special status species in local or regional plans, policies, or regulations, or by the California Department of Fish and Wildlife or U.S. Fish and Wildlife Service?
Impact Analysis
The Project site consists of approximately 46.16 acres of land characterized as disturbed ruderal land. Table 4.4-1, Threatened, Endangered, Candidate, or 1B.1 Ranked Plant Species, and Table
4.4-2, Threatened, Endangered, or Candidate Wildlife Species, identify species that have potential to occur on the Project Site or in the Project vicinity.
The CBA completed for the Project confirmed that no special-status species under CEQA or designated critical habitat were found on the Project site (Appendix C). The Project site is highly disturbed and located in a highly urbanized area. It does not provide suitable habitat to support these species. Accordingly, the Project would not have a substantial adverse effect on any species identified as a candidate, sensitive, or special-status species in local and regional plans, policies, or regulations, or by the CDFW or USFWS.
Additionally, as discussed above, migratory non-game native bird species are protected under the MBTA and the California Fish and Game Code prohibits take of all birds and their active nests.
The Western burrowing owl (BUOW) was approved by the California Fish and Game Commission as a candidate species for listing under the CESA) in 2024, and therefore receives the same legal protection afforded to state listed threatened and endangered species. The Project site does not contain suitable habitat for the BUOW and it was not present on the Project site during the field survey. However, because BUOWs may become established on disturbed sites prior to construction, a pre-construction BUOW survey is recommended within 30 days prior to the start of ground-disturbing activities, as specified further in Mitigation Measure (MM) BIO-1. If BUOWs are detected, appropriate avoidance and minimization measures, including no disturbance buffers and monitoring, shall be implemented in consultation with CDFW as specified in MM BIO-2.
Additionally, the Project Site has shrubs that could be used by nesting songbirds during the nesting bird season. Therefore, the potential for the Project to impact MBTA protected birds exists.
If vegetation removal and other ground disturbance activities can be conducted outside of the recognized nesting bird season, impacts to nesting birds are not expected. However, if work cannot be avoided during the nesting bird season, the Project would implement MM BIO-3, which require pre-construction nesting surveys prior to initiation of Project, should ground disturbance, vegetation clearing, or other construction activities that would otherwise disturb nesting activity Riverview Marketplace Commercial Project
Environmental Impact Report 4.4 Biological Resources
City of Bakersfield – SCH No. 2025101507 4.4-12
(for instance, mobilization of heavy equipment). With the implementation of MM BIO-1 through MM BIO-3, impacts to nesting birds would be avoided and impacts would be less than significant.
Mitigation Measures
The following mitigation measure is applicable to the Project and would be implemented to reduce impacts to a less than significant level.
MM BIO-1 Burrowing Owl (BUOW) Pre-Construction Surveys. Prior to the commencement of ground-disturbing or vegetation-clearing activities, the project applicant/developer shall retain a qualified biologist to conduct pre-construction surveys for BUOW (Athene cunicularia) in accordance with the California Department of Fish and Wildlife (CDFW) 2012 Staff Report on Burrowing Owl Mitigation (CDFG 2012). Depending on the time elapsed between the focused surveys conducted in support of the analysis conducted as a part of the biological resource assessment and the start of construction, additional focused surveys may be required during the survey season immediately preceding construction. As specified in the 2012 Staff Report, one 30-day pre-construction survey is recommended; however, multiple surveys may be necessary prior to construction to determine presence or absence, and burrowing owls may colonize a site following previous negative survey results. Therefore, the project site shall be monitored 30 days prior to ground disturbance to detect any occupancy prior to construction activities.
MM BIO-2 Burrowing Owl (BUOW) Avoidance Buffer. If western burrowing owls or occupied or unoccupied burrows are detected during pre-construction surveys or at any time during construction, no-disturbance buffers shall be established by the qualified biologist in accordance with the California Department of Fish and Wildlife (CDFW) 2012 Staff Report on Burrowing Owl Mitigation (CDFG 2012). Buffer distances (50 – 500 meters) shall be based on the season (breeding or non-breeding), level of owl activity, and the type and intensity of proposed construction activities. These buffers shall remain in place until the qualified biologist determines that the burrow is no longer occupied, the owls have fledged and are no longer dependent on the burrow, or CDFW-approved passive relocation procedures have been completed. The qualified biologist shall monitor compliance with the buffer requirements and shall have the authority to halt work if project activities are causing disturbance to western burrowing owls.
MM BIO-3 Nesting Birds. If ground disturbing and vegetation clearing activities cannot be avoided during the nesting bird season (February 1 through September 15), a qualified biologist shall conduct a pre-construction nesting bird survey within all areas of breeding and nesting habitat within and adjacent to the Project Site no more than 10 days prior to initiation of Project activities that would remove vegetation or otherwise disturb nesting activity (for instance, mobilization of heavy equipment) of all areas of the Project Site that could be directly or indirectly impacted by construction activity.
Riverview Market Commercial Project
Environmental Impact Report 4.4 Biological Resources
City of Bakersfield – SCH No. 2025101507 4.4-13
If nesting birds are encountered, the qualified biologist shall establish a baseline for the behavior of any identified nests and shall continuously monitor the nests to detect changes in behavior. Should behavioral changes occur, the Project proponent shall halt construction work causing that change and consult with the California Department of Fish and Wildlife for additional avoidance and minimization measure.
If continuous monitoring of the identified nests by a qualified biologist is not feasible, a qualified biologist shall establish an avoidance buffer zone around the nest, which shall be determined by the qualified biologist according to species involved. At a minimum, a no-disturbance buffer of 250 feet shall be established around active nests of non-listed bird species and a 500-foot no-disturbance buffer shall be established around active nests of non-listed raptors. No activities that would adversely affect the nest shall occur within the buffer zone until the qualified biologist has determined the nest is no longer active, breading season is over, or the young are no longer dependent on the nest.
Level of Significance After Mitigation
Less than significant with mitigation incorporated.
Threshold BIO-2: Would the project have a substantial adverse effect on any riparian habitat or other sensitive natural community identified in local or regional plans, policies, regulations or by the California Department of Fish and Wildlife or U.S. Fish and Wildlife Service? Impact Analysis
The Project site is highly disturbed. Based on the literature review, there are no wetlands or riparian habitats found on or near the Project Site. The November 2025 survey completed for the Project as part of the CBA confirmed that there are no wetlands or riparian habitats found on the Project Site (Appendix C). As discussed above, aerial images indicated and the November 2025 field survey confirmed that an underground stormwater feature exists near the east border of the Project Site. The feature carries water that flows from four culverts to the southeast of the Project Site from south to north. However, the CBA determined that this stormwater feature exists underground and is not CDFW, USACE, or RWQCB jurisdictional waters. Therefore, the Project no impacts to jurisdictional waters would occur from Project implementation Accordingly, jurisdictional waters would not be impacted by Project implement and no impact to any riparian habitat or other sensitive natural community identified would occur.
Mitigation Measures
None required.
Level of Significance
No impact.
Threshold BIO-3: Would the project have a substantial adverse effect on state or federally protected wetlands (including, but not limited to, marsh, vernal pool, coastal, etc.) through direct removal, filling, hydrological interruption, or other means?
Riverview Marketplace Commercial Project
Environmental Impact Report 4.4 Biological Resources
City of Bakersfield – SCH No. 2025101507 4.4-14
Impact Analysis
The Project would not impact riparian areas, vernal pools or other jurisdictional aquatic resources because these features do not occur on or near the Project Site. As noted above, an underground drainage feature was identified underneath the Project Site, but this is not considered a protected wetland. Therefore, no impacts would occur.
Mitigation Measures
None required.
Level of Significance
No impact.
Threshold BIO-4: Would the project interfere substantially with the movement of any native resident or migratory fish or wildlife species or with established native resident or migratory wildlife corridors, or impede the use of native wildlife nursery sites?
Impact Analysis
No wildlife movement corridors were found to be present on the Project Site. The Project Site is relatively flat and does not contain mountain canyons or riparian corridors nearby which are typically used by wildlife for movement. There are no water features on the Project site that would support the movement or native or migratory fish. Furthermore, Project Site is in urbanized environment and is blocked off on the east end by railroad tracks and a residential area to the west. Accordingly, the Project Site is not part of a wildlife movement corridor, nor does it serve as a wildlife nursery site, and there would be no impact.
Mitigation Measures
None required.
Level of Significance
No impact.
Threshold BIO-5: Would the project conflict with any local policies or ordinances protecting biological resources, such as a tree preservation policy or ordinance?
Impact Analysis
The Project Site is highly disturbed and does not contain any trees that would be required to be removed as part of Project implementation. As such, tree protection ordinances or policies would not apply to the Project. However, Project Site has shrubs that can be used by nesting songbirds during the nesting bird season of February 1 to September 15 that would be removed by the Project. However, the Project would implement new landscaping along the entire site perimeter and internal to the Project Site. Landscaping would include a variety of ornamental trees, shrubs, and groundcover that would provide new bird habitat. The parking lot area would include 443 trees, and the Project would include 122 street trees (79 trees provided on Coffee Road and 43 on Rosedale Highway) plus 534 trees within the Project Site for a total of 656 trees. Therefore, the Project would provide substantial amount of new trees compared to existing conditions.
Riverview Market Commercial Project
Environmental Impact Report 4.4 Biological Resources
City of Bakersfield – SCH No. 2025101507 4.4-15
Additionally, in reviewing the applicable General Plan goals, policies, and implementation programs (see Section 4.4.1, Regulatory Setting), the Project would be consistent with the General Plan by avoiding impact to sensitive biological communities and species by creating a buffer around nesting birds protected by the MBTA and surveying and buffering the BUOW through the implementation of MM BIO-1 through MM BIO-3. Furthermore, as discussed further under Impact BIO-6, the Project would not conflict with the MBHCP since it has expired.
Accordingly, the Project would not conflict with any local policies or ordinances protecting biological resources, and impacts would be less than significant.
Mitigation Measures
Implement MM BIO-1.
Level of Significance After Mitigation
Less than significant with mitigation incorporated.
Threshold BIO-6: Would the project conflict with the provisions of an adopted Habitat Conservation Plan, Natural Community Conservation Plan, or other approved local, regional, or state habitat conservation plan? Impact Analysis
The Project Site is not located within the boundaries of an approved and active State or federal Habitat Conservation Plan. As discussed under Section 4.4.1, Regulatory Setting, the MBHCP and associated ITP expired on January 1, 2023. As such, the Project must comply with direct requests from USFWS or CDFW. During the NOP comment period for the Project, neither USFWS nor CDFW have made direct requests to the Project regarding habitat conservation. Accordingly, there would be no impact.
Mitigation Measures
None required.
Level of Significance After Mitigation
No impact.
Cumulative Impacts
Impact Analysis
Section 3.3, Cumulative Development, identifies projects within an approximately 1.5-mile radius of the Project Site that are planned, under construction, or have been recently completed. A summary of these projects is provided in Table 3-1, Cumulative Projects List. Potential cumulative impacts would occur if the Project, in combination with the identified cumulative projects, would result in significant effects to biological resources. Because biological resources are closely tied to a physical site, for purposes of this analysis, the geographic scope would be the Project Area established by GBA, including the Project Site, and the 1.5-mile radius of the Project site where the identified cumulative projects are situated.
As discussed in Section 4.4.3, Impact Analysis, the Project would have no impact on State or federally protected wetlands, it would have no impact on the movement of any native resident or migratory fish or wildlife species or with established native resident or migratory wildlife corridors Riverview Marketplace Commercial Project
Environmental Impact Report 4.4 Biological Resources
City of Bakersfield – SCH No. 2025101507 4.4-16
or impede the use of native wildlife nursery sites. In addition, as the Project is not located within the boundaries of an adopted Habitat Conservation Plan or other approved local, regional, or State habitat conservation plan, there would be no impact to these plans. Furthermore, there are no wetlands or riparian habitats found on or near the Project site. No existing trees would be removed, so no tree preservation ordinance is applicable to the Project. Moreover, the Project would not conflict with any local policies or ordinances protecting biological resources, and impacts would be less than significant.
Federal and State-listed species have been identified as having the potential to occur in the Project area; however, due to the highly disturbed nature of the Project Site, these resources are unlikely to occur because no suitable habitat for any of the species identified is located on the Project Site. Additionally, as determined by the November 2025 field survey completed of the Project site, all identified species are notably absent. However, as discussed above, the Project has the potential to impact nesting birds protected under the MBTA and the BUOW. As such, the Project would implement MM BIO-1 through MM BIO-3, which requires a qualified biologist to survey the Project Site prior to construction and create a buffer during construction should nesting birds or the BUOW be suspected to be on or adjacent to the Project Site.
Construction
Similar to the Project, the cumulative projects are located in a disturbed, urbanized area with surrounding development. As with the Project, construction of the cumulative projects would be required to be consistent with applicable federal, State, and local regulations concerning biological resources. Furthermore, it is anticipated that in the event of any potential construction impacts associated with the cumulative projects, appropriate mitigation measures would be identified to reduce those impacts to less than significant. Accordingly, the less than significant impacts, with the implementation of MM BIO-1 through MM BIO-3, associated with the Project are not anticipated to combine with any impacts associated with the cumulative projects to substantially affect biological resources. Cumulative impacts associated with construction would be less than significant.
Operations
Similarly, due to the disturbed nature of the area, operations are not expected to significantly impact biological resources. Operational conditions for the Project and cumulative projects are expected to be not dissimilar from existing conditions. Accordingly, cumulative impacts to biological resources associated with the Project and cumulative projects would be less than significant.
Mitigation Measures
Implement MM BIO-1 through MM BIO-3.
Level of Significance After Mitigation
Cumulative impacts related to cultural resources would be less than significant with MM BIO-1 through MM BIO-3 incorporated.
City of Bakersfield – SCH No. 2025101507 4.5-1
4.5 Cultural Resources
This section discusses potential impacts associated with the proposed Riverview Marketplace Commercial Project (Project) that may result in adverse impacts to cultural resources, including historical and archeological resources and human remains. This section also discusses the Project’s consistency with federal, State, and local plans and regulations that protect cultural resources. This analysis is based on a review of the relevant regulatory setting, existing conditions, and a discussion of the thresholds used to determine whether a Project would result into significant impacts to cultural resources. Information in this section is based, in part, on the Metropolitan Bakersfield General Plan (General Plan), the City of Bakersfield (City) Municipal Code (BMC) Title 17 (Zoning Ordinance), and a Cultural Resources Assessment (CRA), dated February 2025, for the Project by BCR Consulting (BCR) and included in Appendix D, Cultural Resources Assessment, to this Draft EIR.
During the scoping period for the Project’s Environmental Impact Report (EIR), no comments were received in response to the Notice of Preparation (NOP) related to cultural resources.
Comments were received related to Tribal Cultural Resources, and as such, are discussed in Section 4.19, Tribal Cultural Resources, of this Draft EIR.
4.5.1 Regulatory Setting
Federal
National Historic Preservation Act and National Register of Historic Places The National Historic Preservation Act of 1966 (NHPA)(16 U.S.C. ch. 1A, subch. II; § 470), established the National Register of Historic Places (National Register) as “an authoritative guide to be used by federal, state, and local governments, private groups and citizens to identify the Nation’s historic resources and to indicate what properties should be considered for protection from destruction or impairment.”1 The National Register recognizes a broad range of cultural resources that are significant at the national, State, and local levels and can include districts, buildings, structures, objects, prehistoric archaeological sites, historic-period archaeological sites, traditional cultural properties, and cultural landscapes. A resource that is listed in or eligible for listing in the National Register is considered “historic property” under Section 106 of the NHPA.
Section 106 of the NHPA also requires federal agencies to consult with State Historic Preservation Officers (SHPOs) and Tribal Historic Preservation Officers (THPOs) if their projects have the potential to affect a historic resource eligible for or listed on the National Register. The National Register identifies more than 98,000 properties as possessing exceptional national significance in American history and culture.2
Criteria
To be eligible for listing in the National Register, a resource must be at least 50 years of age, unless it is of exceptional importance as defined in Title 36 of the Code of Federal Regulations (CFR), part 60, section 60.4(g). The resource must also be significant in American history, architecture, archaeology, engineering, or culture. The following four criteria for evaluation of 1 36 Code of Federal Regulations (CFR) § 60.
2 United States Department of the Interior (DOI), National Park Service (NPS), What is the National Register of Historic Places? Available at: https://www.nps.gov/subjects/nationalregister/what-is-the-national-register.htm. Accessed February 2026.
Riverview Marketplace Commercial Project
Environmental Impact Report 4.5 Cultural Resources
City of Bakersfield – SCH No. 2025101507 4.5-2
eligibility for listing have been established to determine the significance of a resource. A property is eligible for listing if:
A. It is associated with events that have made a significant contribution to the broad patterns of our history;
B. It is associated with the lives of persons significant in our past; C. It embodies the distinctive characteristics of a type, period, or method of construction or that represent the work of a master, or that possess high artistic values, or that represent a significant and distinguishable entity whose components may lack individual distinction; or
D. It has yielded, or may be likely to yield, information important in prehistory or history.3 Context
To be eligible for listing in the National Register, a property must be significant within a historic context. National Register Bulletin #15 states that the significance of a historic property can be judged only when it is evaluated within its historic context. Historic contexts are “those patterns, themes, or trends in history by which a specific...property or site is understood and its meaning... is made clear.”4 A property must represent an important aspect of the area’s history or prehistory and possess the requisite integrity to qualify for the National Register.
Integrity
In addition to meeting one or more of the criteria of significance, a property must have integrity, which is defined as “the ability of a property to convey its significance.”5 The National Register recognizes seven qualities that, in various combinations, define integrity. The seven factors that define integrity are:
• Location
• Design
• Setting
• Materials
• Workmanship
• Feeling
• Association
To retain historic integrity a property must possess several, and usually most, of these seven aspects. Thus, the retention of the specific aspects of integrity is paramount for a property to convey its significance. In general, the National Register has a higher integrity threshold than State or local registers.
3 U.S. DOI, NPS, National Register Bulletin #15: How to Apply the National Register Criteria for Evaluation, 1997, page 8. Available at: https://www.nps.gov/subjects/nationalregister/upload/NRB-15_web508.pdf. Accessed February 2026. 4 Id., at pp. 7 and 8.
5 Id., at p. 44.
Riverview Market Commercial Project
Environmental Impact Report 4.5 Cultural Resources
City of Bakersfield – SCH No. 2025101507 4.5-3
Criteria Considerations
Certain types of properties, including religious properties, moved properties, birthplaces or graves, cemeteries, reconstructed properties, commemorative properties, and properties that have achieved significance within the past 50 years are not considered eligible for the National Register unless they meet one of the seven categories of Criteria Considerations A through G, in addition to meeting at least one of the four significance criteria and possess integrity, as defined above.Criteria Consideration G is intended to prevent the listing of properties for which insufficient time may have passed to allow the proper evaluation of their historical importance. The full list of Criteria Considerations is provided below:
A. A religious property deriving primary significance from architectural or artistic distinction or historical importance; or
B. A building or structure removed from its original location but which is significant primarily for architectural value, or which is the surviving structure most importantly associated with a historic person or event; or
C. A birthplace or grave of a historical figure of outstanding importance, if there is no other appropriate site or building directly associated with his or her productive life; or D. A cemetery which derives its primary significance from graves of persons of transcendent importance, from age, from distinctive design features, or from association with historic events; or
E. A reconstructed building when accurately executed in a suitable environment and presented in a dignified manner as part of a restoration master plan, and when no other building or structure with the same association has survived; or F. A property primarily commemorative in intent if design, age, tradition, or symbolic value has invested it with its own historical significance; or G. A property achieving significance within the past 50 years if it is of exceptional importance.
Secretary of the Interior’s Standards
The National Park Service (NPS) issued the Secretary of the Interior’s Standards for the Treatment of Historic Properties (Secretary’s Standards) with accompanying guidelines for four types of treatments for historic resources: Preservation, Rehabilitation, Restoration, and Reconstruction. The most applicable guidelines should be used when evaluating a project for compliance with the Secretary’s Standards. Although none of the four treatments, as a whole, apply specifically to new construction in the vicinity of historic resources, Standards #9 and #10 of the Secretary’s Standards provides relevant guidance for such projects. The Standards for Rehabilitation are as follows:
1. A property will be used as it was historically or be given a new use that requires minimal change to its distinctive materials, features, spaces and spatial relationships.
2. The historic character of a property will be retained and preserved. The removal of distinctive materials or alteration of features, spaces, and spatial relationships that characterize a property will be avoided.
Riverview Marketplace Commercial Project
Environmental Impact Report 4.5 Cultural Resources
City of Bakersfield – SCH No. 2025101507 4.5-4
3. Each property will be recognized as a physical record of its time, place and use. Changes that create a false sense of historical development, such as adding conjectural features or elements from other historic properties, will not be undertaken.
4. Changes to a property that have acquired significance in their own right will be retained and preserved.
5. Distinctive materials, features, finishes and construction techniques or examples of craftsmanship that characterize a property will be preserved.
6. Deteriorated historic features will be repaired rather than replaced. Where the severity of deterioration requires replacement of a distinctive feature, the new feature shall match the old in design, color, texture, and where possible, materials. Replacement of missing features will be substantiated by documentary and physical evidence.
7. Chemical or physical treatments, if appropriate, will be undertaken using the gentlest means possible. Treatments that cause damage to historic materials will not be used.
8. Archeological resources will be protected and preserved in place. If such resources must be disturbed, mitigation measures will be undertaken.
9. New additions, exterior alterations, or related new construction will not destroy historic materials, features, and spatial relationships that characterize the property. The new work shall be differentiated from the old and will be compatible with the historic materials, features, size, scale and proportion, and massing to protect the integrity of the property and its environment.
10. New additions and adjacent or related new construction will be undertaken in such a manner that if removed in the future, the essential form and integrity of the historic property and its environment would be unimpaired.
It is important to note that the Secretary’s Standards are not intended to be prescriptive but, instead, provide general guidance. They are intended to be flexible and adaptable to specific project conditions to balance continuity and change, while retaining materials and features to the maximum extent feasible. Their interpretation requires exercising professional judgment and balancing the various opportunities and constraints of any given project. Not every Standard necessarily applies to every aspect of a project, and it is not necessary for a project to comply with every Standard to achieve compliance.
Native American Graves Protection and Repatriation Act
The Native American Graves Protection and Repatriation Act (NAGPRA)( 25 U.S.C. ch. 32 § 3001 et seq.) provides for the protection of Native American human remains and funerary and cultural objects and requires federal agencies to return Native American cultural items to the appropriate Federally recognized Indian tribes or Native Hawaiian groups with which they are associated.6 Archaeological Resources Protection Act
The Archaeological Resources Protection Act of 1979 (ARPA) governs the excavation, removal, and disposition of archaeological sites and collections on federal and Native American lands. The ARPA defines archaeological resources as any material remains of human life or activities that are at least 100 years of age, and which are of archeological interest. The ARPA makes it illegal 6 United States Department of the Interior, National Park Service, Native American Graves Protection And Repatriation Act, 1990.
Riverview Market Commercial Project
Environmental Impact Report 4.5 Cultural Resources
City of Bakersfield – SCH No. 2025101507 4.5-5
for anyone to excavate, remove, sell, purchase, exchange, or transport an archaeological resource from federal or Native American lands without a proper permit.7 Archeological and Historic Preservation Act of 1974
The Archeological and Historic Preservation Act of 1974 (AHPA)(54 U.S.C. §§ 312501-312508) requires agencies to report any perceived project impacts on archaeological, historical, and scientific data and requires them to recover such data or assist the Secretary of the Interior in recovering the data.
State
California Environmental Quality Act
The California Environmental Quality Act (CEQA)(Public Resources Code [PRC] § 21000 et seq.) is the principal statute governing environmental review of projects occurring in the State. CEQA requires lead agencies to determine if a proposed project would have a significant effect on the environment, including significant effects on historical or unique archaeological resources. Under CEQA Section 21084.1, a project that may cause a substantial adverse change in the significance of a historical resource is a project that may have a significant effect on the environment.
Historical Resources
CEQA Guidelines Section 15064.5 defines a “historic resource” as including the following:
1. A resource listed in, or determined to be eligible by the State Historical Resources Commission, for listing in the California Register of Historical Resources (California Register) (PRC § 5024.1, Title 14 CCR, Section 4850 et seq.).
2. A resource included in a local register of historical resources, as defined in section 5020.1(k) of the PRC or identified as significant in an historical resource survey meeting the requirements section 5024.1(g) of the PRC, shall be presumed to be historically or culturally significant. Public agencies must treat any such resource as significant unless the preponderance of evidence demonstrates that it is not historically or culturally significant.
3. Any object, building, structure, site, area, place, record, or manuscript which a lead agency determines to be historically significant or significant in the architectural, engineering, scientific, economic, agricultural, educational, social, political, military, or cultural annals of California may be considered to be an historical resource, provided the lead agency’s determination is supported by substantial evidence in light of the whole record. Generally, a resource shall be considered by the lead agency to be “historically significant” if the resource meets the criteria for listing on the California Register (PRC § 5024.1, Title 14 CCR, Section 4852) including the following:
(A) Is associated with events that have made a significant contribution to the broad patterns of California’s history and cultural heritage; (B) Is associated with the lives of persons important in our past; 7 United States Department of the Interior, National Park Service, Technical Brief # 20: Archeological Damage Assessment: Legal Basis and Methods, 2007.
Riverview Marketplace Commercial Project
Environmental Impact Report 4.5 Cultural Resources
City of Bakersfield – SCH No. 2025101507 4.5-6
(C) Embodies the distinctive characteristics of a type, period, region, or method of construction, or represents the work of an important creative individual, or possesses high artistic values; or
(D) Has yielded, or may be likely to yield, information important in prehistory or history.
The significance of a historical resource is impaired when a project demolishes or materially alters in an adverse manner those physical characteristics of a historical resource that convey its historical significance and that justify its eligibility for the California Register. If an impact on a historical or archaeological resource is significant, CEQA requires feasible measures to minimize the impact (State CEQA Guidelines § 15126.4 (a)(1)). Mitigation of significant impacts must lessen or eliminate the physical impact that the project will have on the resource.
Archaeological Resource
If a lead agency determines that an archaeological site is a historical resource, the provisions of PRC Section 21084.1 and CEQA Guidelines Section 15064.5 apply. If an archaeological site does not meet the criteria for a historical resource contained in the CEQA Guidelines, then the site may be treated in accordance with the provisions of PRC Section 21083 if it meets the criteria of a unique archaeological resource. As defined in PRC Section 21083.2, a “unique archaeological resource” is an archaeological artifact, object, or site, about which it can be clearly demonstrated that without merely adding to the current body of knowledge, there is a high probability that it meets any of the following criteria:
• Contains information needed to answer important scientific research questions and there is a demonstrable public interest in that information;
• Has a special and particular quality such as being the oldest of its type or the best available example of its type; or
• Is directly associated with a scientifically recognized important prehistoric or historic event or person.
If an archaeological site meets the criteria for a unique archaeological resource as defined in PRC Section 21083.2, then the site is to be treated in accordance with the provisions of PRC Section 21083.2, which state that if the lead agency determines that a project would have a significant effect on unique archaeological resources, the lead agency may require reasonable efforts be made to permit any or all of these resources to be preserved in place.8If preservation in place is not feasible, mitigation measures shall be required. The CEQA Guidelines note that if an archaeological resource is neither a unique archaeological nor a historical resource, the effects of the project on those resources shall not be considered a significant effect on the environment.9 A significant effect under CEQA would occur if a project results in a substantial adverse change in the significance of a historical resource as defined in CEQA Guidelines Section 15064.5(a).
Substantial adverse change is defined as “physical demolition, destruction, relocation, or alteration of the resource or its immediate surroundings such that the significance of a historical resource would be materially impaired.”10 According to CEQA Guidelines Section 15064.5(b)(2), 8 California Public Resources Code Section 21083.1(a).
9 State CEQA Statute and Guidelines, Section 15064.5(c)(4). 10 State CEQA Guidelines, Section 15064.5(b)(1).
Riverview Market Commercial Project
Environmental Impact Report 4.5 Cultural Resources
City of Bakersfield – SCH No. 2025101507 4.5-7
the significance of a historical resource is materially impaired when a project demolishes or materially alters in an adverse manner those physical characteristics that:
A. Convey its historical significance and that justify its inclusion in, or eligibility for, inclusion in the California Register; or
B. Account for its inclusion in a local register of historical resources pursuant to PRC Section 5020.1(k) or its identification in a historical resources survey meeting the requirements of PRC Section 5024.1(g) Code, unless the public agency reviewing the effects of the project establishes by a preponderance of evidence that the resource is not historically or culturally significant; or
C. Convey its historical significance and that justify its eligibility for inclusion in the California Register as determined by a Lead Agency for purposes of CEQA.
In general, a project that complies with the Secretary’s Standards is considered to have impacts that are less than significant.11
California Register of Historical Resources
The California Register (PRC § 5024.1) is “an authoritative listing and guide to be used by State and local agencies, private groups, and citizens in identifying the existing historical resources of the State and to indicate which resources deserve to be protected, to the extent prudent and feasible, from substantial adverse change.”12 The California Register was established in 1993, and its regulations became effective on January 1, 1998. The California Register is administered by the California Office of Historic Preservation (OHP). The criteria for eligibility for the California Register are based upon National Register criteria.13 Certain resources are determined to be automatically included in the California Register, including California properties formally determined eligible for, or listed in the National Register. To be eligible for the California Register, a prehistoric or historic-period property must be significant at the local, State, and/or federal level under one or more of the following four criteria:
1. Associated with events that have made a significant contribution to the broad patterns of local or regional history or the cultural heritage of California or the United States.
2. Associated with the lives of persons important to local, California, or national history;
3. Embodies the distinctive characteristics of a type, period, region, or method of construction, or represents the work of an important creative individual, or possesses high artistic values; or
4. Has yielded, or may be likely to yield, information important in prehistory or history of the local area, California or the nation.
A resource eligible for the California Register must meet one of the criteria of significance described above and retain enough of its historic character or appearance (integrity) to be recognizable as a historical resource and to convey the reason for its significance. This is defined as the ability for the resource to convey its significance through seven aspects: location, setting, design, materials, workmanship, feeling, and association. 11 State CEQA Guidelines, 15064.5(b)(3).
12 California Public Resources Code, Section 5024.1[a]. 13 California Public Resources Code, Section 5024.1[b].
Riverview Marketplace Commercial Project
Environmental Impact Report 4.5 Cultural Resources
City of Bakersfield – SCH No. 2025101507 4.5-8
In addition to meeting one or more of the above criteria, the California Register requires that sufficient time has passed since a resource’s period of significance to “obtain a scholarly perspective on the events or individuals associated with the resources.” (CCR 4852 [d][2]). Fifty years is normally considered sufficient time for a potential historical resource, and in order that the evaluation remain valid for a minimum of five years after the date of this report, all resources older than 45 years (i.e. resources from the “historic-period”) will be evaluated for California Register listing eligibility, or CEQA significance.
It is possible that a historic resource may not retain sufficient integrity to meet the criteria for listing in the National Register, but it may still be eligible for listing in the California Register. Additionally, the California Register consists of resources that are listed automatically and those that must be nominated through an application and public hearing process. The California Register automatically includes the following:
• California properties listed on the National Register and those formally determined eligible for the National Register;
• California Registered Historical Landmarks from No. 770 onward; and, • Those California Points of Historical Interest that have been evaluated by the State Office of Historic Preservation (OHP) and have been recommended to the State Historical Resources Commission for inclusion on the California Register.
Other resources that may be nominated to the California Register include:
• Historical resources with a significance rating of Category 3 through 5 (those properties identified as eligible for listing in the National Register, the California Register, and/or a local jurisdiction register);
• Individual historical resources;
• Historic districts; and,
• Historical resources designated or listed as local landmarks, or designated under any local ordinance, such as an historic preservation overlay zone.
CEQA Guidelines Section 15064.5 Appendix G includes significance criteria relative to archaeological and historical resources. These have been utilized as thresholds of significance here, and a project would have a significant environmental impact if it would:
a) Cause a substantial adverse change in the significance of a historical resource as defined in section 10564.5;
b) Cause a substantial adverse change in the significance of an archaeological resource pursuant to Section 10564.5; or
c) Disturb any human remains, including those interred outside of formal cemeteries.
California Health and Safety Code
California Health and Safety Code Sections 7050.5, 7051, and 7054 address the illegality of interference with human burial remains (except as allowed under applicable sections of the PRC), and the disposition of Native American burials in archaeological sites. These regulations protect such remains from disturbance, vandalism, or inadvertent destruction, and establish procedures to be implemented if Native American skeletal remains are discovered during construction of a Riverview Market Commercial Project
Environmental Impact Report 4.5 Cultural Resources
City of Bakersfield – SCH No. 2025101507 4.5-9
project, including treatment of the remains prior to, during, and after evaluation, and reburial procedures.
California Public Resources Code
PRC Section 5097.98, as amended by Assembly Bill 2641, provides procedures in the event human remains of Native American origin are discovered during project implementation. Section 5097.98 requires that no further disturbances occur in the immediate vicinity of the discovery, that the discovery is adequately protected according to generally accepted cultural and archaeological standards, and that further activities consider the possibility of multiple burials. Section 5097.98 further requires the Native American Heritage Commission (NAHC), upon notification by a County Coroner, designate and notify a Most Likely Descendant (MLD) regarding the discovery of Native American human remains. Once the MLD has been granted access to the site by the landowner and inspected the discovery, the MLD then has 48 hours to provide recommendations to the landowner for the treatment of the human remains and any associated grave goods. In the event that no descendant is identified, or the descendant fails to make a recommendation for disposition, or if the landowner rejects the recommendation of the descendant, the landowner may, with appropriate dignity, reinter the remains and burial items on the property in a location that will not be subject to further disturbance.
California Administrative Code
Section 4308, Archaeological Features, of Title 14 of the California Administrative Code provides that: “No person shall remove, injure, disfigure, deface, or destroy any object of archaeological, or historical interest or value.”
California Code of Regulations
Title 14, Section 1427 California Code of Regulations Title 14, Section 1427 provides that: “No person shall collect or remove any object or thing of archaeological or historical interest or value, nor shall any person injure, disfigure, deface or destroy the physical site, location or context in which the object or thing of archaeological or historical interest or value is found”.
Traditional Tribal Cultural Places Act (California Senate Bill 18) California Senate Bill 18 (SB 18), enacted in 2004 and referred to as the Traditional Tribal Cultural Places Act, requires city and county governments to consult with California Native American tribes during the adoption of a General Plan or Specific Plan amendment to help protect traditional tribal cultural places through local land use planning before land use decisions are finalized. The intent of involving Tribes at early planning stages is to allow consideration of cultural places in the context of broad local land use policy, before individual site-specific, project-level land use decisions are made by a local government. SB18 requires local governments to provide opportunities for early consultation for projects that include the adoption and amendment of both general plans (defined in Government Code § 65300 et seq.) and specific plans (defined in Government Code § 65450 et seq.) and the designation of open space in a General Plan. To comply with SB 18, local governments must follow the consultation requirements identified below:
• Local governments must request a list of potentially affiliated tribes from the NAHC; • Tribes identified by the NAHC must be formally offered consultation; • Tribes have 90 days to request consultation after receiving notice; and Riverview Marketplace Commercial Project
Environmental Impact Report 4.5 Cultural Resources
City of Bakersfield – SCH No. 2025101507 4.5-10
• The goal is to reach mutually agreeable measures to preserve or mitigate impacts to Tribal cultural places.
SB 18 applies to both federally recognized Tribes and non-federally recognized California Native American Tribes listed by the NAHC that are culturally affiliated with the planning area for the Project. SB 18 is focused on long-range planning whereas Assembly Bill 52 (AB 52) applies to CEQA review of individual projects, addressing impacts to Tribal Cultural Resources (TCRs).
Consultation under SB 18 does not replace or satisfy AB 52 consultation requirements.
California Assembly Bill 52
AB 52, enacted in 2014, amended CEQA to formally recognize and protect TCRs and to require government-to-government consultation with California Native American Tribes during the environmental review process of a project to ensure the project would affect those resources. AB 52 amended Section 5097.94 of, and added Sections 21073, 21074, 21080.3.1, 21080.3.2, 21802.3, 21083.09, 21084.2, and 21084.3 to the PRC relating to Native Americans. AB 52 was adopted to ensure that tribal cultural resources are identified and considered early in the CEQA process, before irreversible project decisions are made. By requiring improved coordination between CEQA lead agencies, project proponents, and Tribes, it assumes that conflicts and delays would be avoided and respect for Tribal sovereignty and cultural heritage would be strengthened by integrating Tribal knowledge in planning decision-making. AB 52 applies to all projects subject to CEQA that include the filing of a NOP (generally meaning EIRs), Notice of Negative Declarations, and Notice of Mitigated Negative Declarations on or after July 1, 2015.14 The PRC now establishes that “[a] project with an effect that may cause a substantial adverse change in the significance of a tribal cultural resource is a project that may have a significant effect on the environment.” (PRC Section 21084.2.) To help determine whether a project may have such an effect, the PRC requires a lead agency to consult with any California Native American tribe that requests consultation and is traditionally and culturally affiliated with the geographic area of a proposed project. That consultation must take place prior to the determination of whether a negative declaration, mitigated negative declaration, or environmental impact report is required for a project (PRC § 21080.3.1.). If a lead agency determines that a project may cause a substantial adverse change to tribal cultural resources, the lead agency must consider measures to mitigate that impact. Public Resources Code § 21084.3 (b)(2) provides examples of mitigation measures that lead agencies may consider to avoid or minimize impacts to tribal cultural resources.
Section 21074 of the PRC defines “tribal cultural resources.” In brief, in order to be considered a “tribal cultural resource,” a resource must be either:
1. Sites, features, places, cultural landscapes, sacred places, and objects with cultural value to a California Native American tribe that are either of the following:
a. Included or determined to be eligible for inclusion in the California Register of Historical Resources.
b. Included in a local register of historical resources as defined in subdivision (k) of Section 5020.1. 2.
14 Governor’s Office of Land Use and Climate Innovation (previously the Governor’s Office of Planning and Research). 2014. State of California Tribal Consultation Guidelines, Supplement to General Plan Guidelines. Available at: https://nahc.ca.gov/wp- content/uploads/2019/04/SB-18-Tribal-Consultation-Guidelines.pdf. Accessed February 2026.
Riverview Market Commercial Project
Environmental Impact Report 4.5 Cultural Resources
City of Bakersfield – SCH No. 2025101507 4.5-11
2. A resource determined by the lead agency, in its discretion and supported by substantial evidence, to be significant pursuant to criteria set forth in subdivision (c) of Section 5024.1. The lead agency shall consider the significance of the resource to a California Native American tribe if it is:
a. A cultural landscape that meets the criteria of subdivision (a) is a tribal cultural resource to the extent that the landscape is geographically defined in terms of the size and scope of the landscape.
b. A historical resource described in Section 21084.1, a unique archaeological resource as defined in subdivision (g) of Section 21083.2, or a “nonunique archaeological resource” as defined in subdivision (h) of Section 21083.2 may also be a tribal cultural resource if it conforms with the criteria of subdivision (a).
Paleontological Resources
CEQA provides guidance relative to significant impacts on paleontological resources, indicating that a project would have a significant impact on paleontological resources if it disturbs or destroys a unique paleontological resource or site or unique geologic feature. Section 5097.5 of the PRC specifies that any unauthorized removal of paleontological remains is a misdemeanor. Further, California Penal Code Section 622.5 sets the penalties for damage or removal of paleontological resources. CEQA documentation prepared for projects would be required to analyze paleontological resources as a condition of the CEQA process to disclose potential impacts. As of January 2018, paleontological resources are considered in the geological rather than cultural category. Therefore, paleontological resources are not summarized in the body of this section.
Please refer to Section 3.7, Geology and Soils, of this Draft EIR. A paleontological overview completed by the Western Science Center is provided in Appendix D, Cultural Resources Assessment, to this Draft EIR.
Local
Metropolitan Bakersfield General Plan
The General Plan, dated December 2002, was updated in January 2016 per Resolution No. 018- 16 and 019-16. At the time this EIR was published for public review, the City was in the process of updating its General Plan, but it had not yet been adopted. The General Plan includes goals, policies, and directions to achieve the City’s vision of the community and future development. The General Plan includes 12 elements that focus on: Land Use; Circulation; Housing; Conservation; Noise; Safety; Downtown Redevelopment; Open Space; Public Services Facilities; Parks; Kern River Plan; and Historical Resources.
The General Plan established the following goals and policies in order to protect the City’s cultural resources.
Land Use Element
LAND/RD-P-3 Ensure that residential uses are located in proximity to commercial services, employment centers, public services, transportation routes, and recreational and cultural resources (l-1).
LAND/CD-P-41 Provide for the intensification of downtown Bakersfield for governmental, financial, professional office, retail, residential, cultural, specialty, and supporting uses (I-1).
Riverview Marketplace Commercial Project
Environmental Impact Report 4.5 Cultural Resources
City of Bakersfield – SCH No. 2025101507 4.5-12
LAND/CD-P-43 Encourage renovation and the adaptive reuse of significant cultural and entertainment facilities downtown (l-5).
LAND/PF-P-50 Coordinate with the appropriate agencies so that adequate land and facilities are set aside for schools, parks, police/fire, libraries, cultural facilities, recreational facilities and other service uses to serve the community (1-2).
Parks Element
PARKS-P-16 Accommodate social, cultural and ethnic needs in the design and programming of recreational spaces and facilities (1-2).
City of Bakersfield Land Use Zoning Ordinance
The City’s Zoning Ordinance is included in Title 17 of the Bakersfield Municipal Code. The Zoning Ordinance implements the goals and policies of the General Plan, which serve to promote and protect the public health, safety, peace, morals, comfort, convenience and general welfare. The Zoning Ordinance assists in providing a definite plan of development for the City and to guide, control and regulate the future growth of the city in accordance with the General Plan. The Zoning Ordinance also is intended to protect the established character and the social and economic stability of agricultural, residential, commercial, industrial and other areas within the City, and to assure the orderly and beneficial development of such areas.
City of Bakersfield Historic Preservation Program
The City of Bakersfield’s Historical Preservation Program is dedicated to identifying, protecting, and celebrating the unique architectural, cultural, and historical resources that define the community’s rich heritage. By preserving significant buildings, sites, structures, and other features, the City aims to safeguard the stories and styles that shape our city’s identity. This effort fosters public understanding of the City’s past, encourages civic pride, supports educational and recreational opportunities, and promotes thoughtful development that honors the City’s diverse history. In doing so, the City also enhances its appeal to residents, tourists, and businesses alike, ensuring that the City’s shared heritage remains a vital and visible part of the City’s future.15 The City of Bakersfield is home to a variety of unique locations with significant historical, artistic, architectural, and cultural backgrounds. With locations having origins dating back to the 1800s, many places helped City become what it is today.16 The City maintains a local Register of Historic Places that includes 17 historic places and four areas of historic interest. Bakersfield also contains four places listed on the National Register.
17 City of Bakersfield Municipal Code
Chapter 15.72, Historical Preservation
This purpose of this chapter of City of Bakersfield Municipal Code (Municipal Code) is to promote the public health, safety and general welfare by providing for the identification, protection, enhancement, perpetuation and use of improvements, buildings, structures, signs, objects, features, sites, places and areas within Bakersfield that reflect special elements of the city’s 15 City of Bakersfield. 2026. Historic Preservation webpage. Available at: https://www.bakersfieldcity.us/256/Historic-Preservation.
Accessed February 2026.
16 City of Bakersfield. 2026. Historic Preservation webpage. Available at: https://www.bakersfieldcity.us/256/Historic-Preservation.
Accessed February 2026.
17 City of Bakersfield. Bakersfield Register of Historic Places. Available at: https://content.civicplus.com/api/assets/ee46706a-491d- 4252-a2f2-b42a3f33988d. Accessed February 2026.
Riverview Market Commercial Project
Environmental Impact Report 4.5 Cultural Resources
City of Bakersfield – SCH No. 2025101507 4.5-13
architectural, artistic, cultural, engineering, aesthetic, historical, political, social and other heritage for the following reasons:
A. To safeguard the city’s heritage as embodied and reflected in such resources; B. To encourage public knowledge, understanding, and appreciation of the City’s past; C. To foster civic and neighborhood pride and a sense of identity based on the recognition and use of cultural resources;
D. To promote the enjoyment and use of cultural resources appropriate for the education and recreation of the people of the City;
E. To preserve diverse and harmonious architectural styles and design preferences of periods of the city’s history and to encourage complementary contemporary design and construction;
F. To protect and enhance the City’s attraction to tourists and visitors (thereby stimulating business and industry);
G. To identify as early as possible conflicts between the preservation of cultural resources and alternative land uses;
H. To integrate the preservation of cultural resources and the extraction of relevant data from such resources into public and private land management and development processes; I. To conserve valuable material and energy resources by ongoing use and maintenance of the existing built environment. (Ord. 4460 § 1, 2007)
4.5.2 Environmental Setting
A CRA for the Project Site was completed in February 2025 by BRC and is included in Appendix D, Cultural Resources Assessment, to this Draft EIR. The CRA prepared includes a cultural resources records search, additional research, intensive-level pedestrian field survey, NAHC Sacred Lands File Search, and vertebrate paleontological resources overview were conducted for the Project consistent with CEQA. This CRA is intended to determine whether cultural resources are located within the Project boundaries, whether any cultural resources are significant pursuant to the above-referenced regulations and standards, and to develop specific mitigation measures that will address potential impacts to existing or potential resources. The following sections include a summary of description of the environmental setting as provided in Appendix D.
Existing Conditions
As discussed in Chapter 2, Project Description, the approximately 46.16-acre Project Site is located south of Rosedale Highway, west of El Toro Viejo Road, east of Coffee Road, and north of Burlington Northern Santa Fe (BNSF) Main Line. The Project Site is bordered by various developments including commercial and residential uses to the west, a PG&E electric substation, railroad tracks and vacant land to the south, a commercial retail center to the north, and commercial retail uses and vacant land to the east. The Project Site is located in section 29, Township 29 South, Range 27 East, Mt Diablo Baseline and Meridian. It is depicted on the United States Geological Survey (USGS) Oildale, California (1968) 7.5-minute topographic quadrangles.
The Project Site is located on a portion of a larger property formerly occupied by the PG&E Kern Power Plant. The Project Site is currently secured on all sides by chain-link fencing, with vehicular access provided via gated unpaved entry drives along Coffee Frontage Road and one concrete Riverview Marketplace Commercial Project
Environmental Impact Report 4.5 Cultural Resources
City of Bakersfield – SCH No. 2025101507 4.5-14
paved driveway along Rosedale Highway and Coffee Road. Both Coffee Road and Rosedale Highway are improved with concrete curb and gutters, yet only Rosedale Highway is fully developed with a concrete sidewalk. Portion of Coffee Road is improved with concrete sidewalk.
Existing onsite features include abandoned oil wells; electrical transmission lines on metal poles, towers, and wooden poles; and several dirt roads and mounds.
Natural Setting
Prior to the introduction of large-scale agriculture and oil exploration, the San Joaquin River and Tulare Lake’s massive system of channels, sloughs, and tule-choked marshes defined the local ecosystem. As a result, the biotic character of the San Joaquin Valley was historically much more diversified than is presently evident. Large freshwater marshes and vast expanses of grassland supported a variety of wildlife, including grizzly bears and wolves (both locally extinct), tule elk, jackrabbits, quail, and numerous fish, rodents, reptiles and birds The Project Site’s elevation is approximately 370 to 380 feet above mean sea level (AMSL), located in the east portion of the southern San Joaquin Valley. Rainfall in the local area is approximately eight inches per year, on average, and the runoff is channeled from northeast to southwest. Local vegetation consistent non-native season grasses and Russian thistle. Dirt roads and natural clearings have revealed homogenous soils made up of fine silts that contain very few rocks, which exhibit no evidence of prehistoric or historic cultural utility within the Project Site.18 Cultural Setting
Prehistoric Setting
The Project is situated within the traditional boundaries of the Southern Valley Yokuts. This prehistoric population depended heavily on the Tulare, Buena Vista, and Kern Lakes and their connecting sloughs and rivers for sustenance and transportation. The local Southern Valley Yokuts, referred to as the Chuxoxi, represented one of the southernmost Yokut political units and were associated with the channels and sloughs of the Kern River delta. Chuxoxi trade routes and rights to the delta allowed them to reap the benefits of the related perennial water sources. This enabled local populations to pursue a relatively sedentary lifestyle in an otherwise arid climate.
Prehistorically, such sedentism often coincides with a village-style residential model in which residential bases remain the same or seasonal, while specialized procurement parties are deployed to more remote areas to collect specialized resources. This village model has been locally supported by early ethnographers, who considered Yokuts unique in California for forming "true tribes" and for developing an unparalleled array of dialect. 19 Historical Setting
The first Europeans to establish contact with the Sothern Valley Yokuts were Spanish troops led by Captain Don Pedro Fages in pursuit of deserters. Father Francisco Garces also travelled through the San Joaquin Valley searching for an overland route from Yuma to Monterey. During his travels, Garces noted positive interactions with locals. The Mexican era (1821-1848) saw little notable cultural exchange between Mexicans and Southern Valley Yokuts, although an 1833 malaria epidemic devastated the local native population.
The ensuing American era, punctuated by California’s annexation into the United States in 1848, resulted in overwhelming Anglo settlement and seizing of Indian lands, and disrupted any 18 BCR Consulting. 2025. Cultural Resources Assessment Rosedale & Coffee Commercial Retail Center. See Appendix D. 19 BCR Consulting. 2025. Cultural Resources Assessment Rosedale & Coffee Commercial Retail Center. See Appendix D.
Riverview Market Commercial Project
Environmental Impact Report 4.5 Cultural Resources
City of Bakersfield – SCH No. 2025101507 4.5-15
remaining prehistoric Yokut influence in the San Joaquin Valley. Mining and ranching represented the early historical focus of the San Joaquin Valley, although the region’s abundant natural water supply, mild climate, and huge tracts of arable land soon led to the successful development of agriculture. The resulting diversion of local water and skyrocketing real estate values transformed the physical and economic character of the valley and have allowed it to remain one of the most productive agricultural regions in the world to this day.20 Project-Site Specific History
According to General Land Office Records, the Project Site was once part of a land patent granted to the Southern Pacific Railroad on April 6, 1876. By the 1940s, the subject property was owned by the Pacific Gas & Electric (PG&E) and contained a PG&E power plant which was in operation until the mid-1980s. The former oil pump site was located on the northern portion of the subject property and overlapped areas utilized by the PG&E plant that was demolished in 2013. By the mid-1980s through early 2000s, a Christmas tree farm was present within the boundaries of the oil pump site while it was in operation. The oil pump site continued to operate and draw oil from the Fruitvale oil reserve and was operated by DD Naturals Resources, LLC until it was recently taken offline.
4.5.3 Impact Analysis
Methodology
As discussed above, the analysis of potential impacts to cultural resources is based on the CRA prepared by BCR for the Project Site, included as Appendix D, and consistent with CEQA (PCR Chapter 2.6, Section 21083.2, and CCR Title 14, Chapter 3, Article 5, Section 15064.5) and Municipal Code Chapter 15.72. The CRA includes a resources search, field survey, and review of regulatory requirements and documents as further described below.
Records Search
On September 12, 2022, a records search was conducted by the SSJVIC at California State University, Bakersfield. This archival research reviewed the status of all recorded historic and prehistoric cultural resources, and survey and excavation reports completed within one half-mile of the Project Site. Additional resources reviewed included the National Register, the California Register, and documents and inventories published by the California OHP. These include the lists of California Historical Landmarks, California Points of Historical Interest, Listing of National Register Properties, and the Inventory of Historic Structures.
Data from the SSJVIC revealed that 20 previous cultural resources studies have taken place, and 14 cultural resources have been recorded within one half-mile of the Project Site. Three of the previous studies from the record search have assessed portions of the Project Site for cultural resources revealing that one cultural resource (a historic-period refuse scatter designated: P-15- 3290) has been previously recorded within its boundaries.
P-15-3290 was originally recorded as a domestic refuse site in 1991 by the Cultural Resource Facility at California State University, Bakersfield. The site contained various glass fragments, ceramics, and kitchen supplies. However, during the initial field survey and the updated field survey, BCR observed that the area has been subject to mechanical clearing and the site is presumed destroyed.
20 BCR Consulting. 2025. Cultural Resources Assessment Rosedale & Coffee Commercial Retail Center. See Appendix D.
Riverview Marketplace Commercial Project
Environmental Impact Report 4.5 Cultural Resources
City of Bakersfield – SCH No. 2025101507 4.5-16
Field Survey
The field survey was intended to locate and document previously recorded or new cultural resources, including archaeological sites, features, isolates, and historic-period buildings, that exceed 45 years in age within defined Project boundaries. The Project Site was examined using 15-meter transect intervals, where accessible.
An initial intensive-level field survey of the Project Site was conducted on October 19, 2022, and an updated field survey of the Project Site was conducted on January 16, 2025. The Project Site has been completely disturbed by historic-period oil pumps, oil tanks, and related installations, and some recent demolition and excavation activity. Vegetation included sparse seasonal grasses in areas that have not been subject to asphalt paving or recent demolition and excavation.
Average visibility was approximately 50 percent and sediment comprised sandy silt with very few rocks
One previously recorded resource and four newly recorded historic-period resources were identified during the initial field visit, and they were all re-recorded/updated during the recent field survey in 2025. Table 4.5-1 – Recorded Cultural Resources at Project Site, below, identifies each resource, provides a detailed description, and summarizes its current condition.
Table 4.5-1 – Recorded Cultural Resources at Project Site Resource Description Status
P-15-3290 Originally recorded as a domestic refuse site in 1991 by the Cultural Resource Facility at California State University, Bakersfield. The site contained various glass fragments, ceramics, and kitchen supplies.
The area has been subject to
mechanical clearing and the
site is presumed destroyed.
PWK2203-H-1 Historic-period, 14-acre oil well and pump site located within the grounds of the former PG&E Kern Power Plant. During the initial survey in 2022, the Project Site contained four oil wells with pumping units, two 20-foot diameter oil and water storage tanks, and three wooden electrical distribution poles. The southeasternmost pump and two storage tanks were installed between 1952 and 1958, and the other three pumps were
installed between 1968 and 1984. At least one pump fed into the oil and water storage tanks, and it is assumed that the three pumps were associated with the former tanks on the Project Site The wooden electrical distribution poles supplied power to electric drive motors on each of the units
All oil well pumps and the
water and oil storage tanks
had been demolished and
removed from the Project Site
and the oil well were in the
process of being capped by
the time of the 2025 field
survey was completed. The
wooden electrical distribution
poles have not been altered.
PWK2203-H-4 Historic-period, 230 KV double circuit lattice steel transmission tower within the Midway-Kern 230 KV alignment. Historic aerials indicate it was established by 1958 and it continues to operate and distribute electricity from the PG&E Kern
substation adjacent to the tower.
No visible alterations between
the initial and recent field
survey.
PWK2203-H-5 Historic-period, double circuit lattice steel transmission tower within the Kern Lerdo/Kern Oil 115 KV alignment. Historic aerials indicate that it was established by 1958 and continues to operate and distribute electricity from the PG&E Kern substation adjacent to the tower.
No visible alterations between
the initial and recent field
survey.
PWK2203-H-6. Historic-period, double circuit lattice steel transmission tower shared by the Kern Oil Famoso 70 KV and Kern Live Oak 115 KV alignment. Historic aerials indicate that it was established by 1958 and continues to operate and distribute electricity from the PG&E Kern substation adjacent to the tower.
No visible alterations between
the initial and recent field
survey.
Source: BCR Consulting, 2025.
Riverview Market Commercial Project
Environmental Impact Report 4.5 Cultural Resources
City of Bakersfield – SCH No. 2025101507 4.5-17
Digital photographs were taken at various points within the Project Site (Appendix D). Any cultural resources found were recorded on DPR 523 forms consistent with the California OHP Instructions for Recording Historical Resources in the field.
Historical Resources Significance Evaluation
As discussed above, during the field survey, the historic-period refuse scatter designated P-15- 3290 could not be identified. The CRA presumed it was destroyed and does not merit further consideration as a potential historical resource. However, the other four resources identified in Table 4.5-1, above, have been evaluated for recordation as historical and archeological resources consistent with CEQA.
California Register Evaluation
As discussed under Section 4.5.1, Regulatory Setting, a property is eligible for inclusion on the California Register or as a City Landmark if one or more of the following criteria is met:
• Criteria 1: It is associated with the events that have made a significant contribution to the broad patterns of local or regional history, or the cultural heritage of California or the United States;
• Criteria 2: It is associated with the lives of persons important to local, California, or United States history;
• Criteria 3: It embodies the distinctive characteristics of a type, period, region, or method of construction, represents the work of a master, possesses high artistic values; and/or • Criteria 4: It has yielded, or has the potential to yield, information important to the prehistory or history of the local area, California, or the nation.
In addition to meeting one or more of the above criteria, the California Register requires that sufficient time has passed since a resource’s period of significance to “obtain a scholarly perspective on the events or individuals associated with the resources.” (CCR 4852 [d][2]). The California Register also requires that a resource possesses integrity. Table 4.5-2, California Register Eligibility Evaluation, evaluates the four resources identified and whether they meet the California Register criteria.
Table 4.5-2 – California Register Eligibility Evaluation Criteria 1 Criteria 2 Criteria 3 Criteria 4 Conclusion
Resource: PWK2203-H-1
Not Eligible. Although the
Project Site was
connected to oil
exploration and
development in the
County, the installations
occurred late in this era
and were regionally
common. Research has
not indicated a close
association between these
resources and any
important events.
Not Eligible.
Substantial
research has
failed to connect
the Project Site
with the lives of
persons
important in
California’s past.
Not Eligible. The oil
pumps (removed prior to
the 2025 field survey),
utility towers, and tanks
lacked architectural
distinction and did not
display significant or
unique features. They do
not significantly represent
the work of an important
creative individual or
possess high artistic
values.
Not Eligible.
The Project
Site has not
and is not likely
to yield
information
important in
prehistory or
history.
Not a
recommended
historical
resource under
CEQA.
Resource: PWK2203-H-4
Not Eligible. Substantial
research has not indicated
Not Eligible.
Substantial
Not Eligible. The
transmission tower is a
Not Eligible.
The Project
Not a
recommended
Riverview Marketplace Commercial Project
Environmental Impact Report 4.5 Cultural Resources
City of Bakersfield – SCH No. 2025101507 4.5-18
a close association
between this transmission
tower and any important
events. Although it is
connected with electrical
development and
transmission in the
County, a single tower
does not demonstrate that
connection in any
significant way.
research has
failed to connect
the Project Site
with the lives of
persons
important in
California’s past.
utilitarian structure. It
lacks architectural
distinction and does not
display significant
elements of the era during
which it was constructed.
It does not represent the
work of an important
creative individual or
possesses high artistic
values.
Site has not
and is not likely
to yield
information
important in
prehistory or
history.
historical
resource under
CEQA.
Resource: PWK2203-H-5
Not Eligible. Substantial
research has not indicated
a close association
between this transmission
tower and any important
events. Although it is
connected with electrical
development and
transmission in the
County, a single tower
does not demonstrate that
connection in any
significant way.
Not Eligible.
Substantial
research has
failed to connect
the Project Site
with the lives of
persons
important in
California’s past.
Not Eligible. The
transmission tower is a
utilitarian structure. It
lacks architectural
distinction and does not
display significant
elements of the era during
which it was constructed.
It does not represent the
work of an important
creative individual or
possesses high artistic
values.
Not Eligible.
The Project
Site has not
and is not likely
to yield
information
important in
prehistory or
history.
Not a
recommended
historical
resource under
CEQA.
Resource: PWK2203-H-6
Not Eligible. Substantial
research has not indicated
a close association
between this transmission
tower and any important
events. Although it is
connected with electrical
development and
transmission in the
County, a single tower
does not demonstrate that
connection in any
significant way.
Not Eligible.
Substantial
research has
failed to connect
the Project Site
with the lives of
persons
important in
California’s past.
Not Eligible. The
transmission tower is a
utilitarian structure. It
lacks architectural
distinction and does not
display significant
elements of the era during
which it was constructed.
It does not represent the
work of an important
creative individual or
possesses high artistic
values.
Not Eligible.
The Project
Site has not
and is not likely
to yield
information
important in
prehistory or
history.
Not a
recommended
historical
resource under
CEQA
Source: BCR Consulting, 2025.
Thresholds of Significance
The City utilizes the California Environmental Quality Act (CEQA) Guidelines, Appendix G, and thresholds of significance21 to analyze the environmental impacts of the Project. Per CEQA Guidelines, an impact is considered significant if the Project would:
• Cause a substantial adverse change in the significance of a historical resource pursuant to § 15064.5.
• Cause a substantial adverse change in the significance of an archaeological resource pursuant to § 15064.5.
• Disturb any human remains, including those interred outside of dedicated cemeteries. 21 Association of Environmental Professionals (AEP). 2025. CEQA Guidelines Appendices, Appendix G: Environmental Checklist Form. Available at: https://www.califaep.org/docs/CEQA_Handbook_2025combined.pdf. Accessed January 2026.
Riverview Market Commercial Project
Environmental Impact Report 4.5 Cultural Resources
City of Bakersfield – SCH No. 2025101507 4.5-19
Project Impacts
Threshold CUL-1 Would the project cause a substantial adverse change in the significance of a historical resource pursuant to § 15064.5? Impact Analysis
The records search conducted for the Project has revealed that 20 previous cultural resource studies have taken place, and 14 cultural resources have been identified within one half-mile of the Project Site. Three of the previous studies assessed portions of the Project Site for cultural resources, and one resource (a historic-period refuse scatter designated P-15-3290) was previously identified within the Project Site boundaries; however, during the field survey conducted by BCR, the resource was not able to be located and assumed to be destroyed. Four additional historic-period cultural resources were identified and evaluated for California Register.
As discussed above, under Historical Resources Significance Evaluation, these identified resources were recommended not eligible for the California Register and therefore are not considered a historic resource under CEQA consistent with CEQA Guidelines Section 15064.5.
As such, impacts to historical resources would be less than significant with no mitigation measures required.
Mitigation Measures
None required.
Level of Significance After Mitigation
Less than significant impact.
Threshold CUL-2: Would the project cause a substantial adverse change in the significance of an archaeological resource pursuant to § 15064.5? Impact Analysis
Although neither the record search nor the field visit conducted as part of the CRA identified archeological resources, ground-disturbing activities have the potential to reveal buried deposits not observed on the surface. Additionally, as some development occurred before the implementation of regulations related to the identification of archaeological resources, it is also possible that archaeological resources were present on the Project Site and were not recorded before or during development.
Therefore, the Project would implement Mitigation Measure (MM) CUL-1, which would require that field personnel be alerted to the possibility of buried prehistoric or historic cultural deposits prior to initiation of ground-disturbing activities. MM CUL-1 would also provide a process for treatment of any archaeological resources inadvertently discovered during Project implementation. Implementation of MM CUL-1 shall also require a cessation of construction activity and consultation with a qualified archaeologist to evaluate the Project Site and make the necessary findings. As such, with the implementation MM CUL-1, impacts to archaeological resources would be less than significant with mitigation incorporated.
Mitigation Measures
The following mitigation measure is applicable to the Project and would be implemented to reduce impacts to a less than significant level.
Riverview Marketplace Commercial Project
Environmental Impact Report 4.5 Cultural Resources
City of Bakersfield – SCH No. 2025101507 4.5-20
MM CUL-1 Inadvertent Discovery of Cultural Resources. If suspected cultural resources are encountered during ground disturbance activities, all work within 100 feet of the find shall immediately cease and the area cordoned off until a qualified cultural resource specialist that meets the Secretary of the Interior’s Professional Qualification Standards can evaluate the find and make recommendations. If the specialist determines that the discovery represents a potentially significant cultural resource, additional investigations may be required. If cultural resources are discovered that may have relevance to Native Americans, the specialist or Project Applicant shall provide written notice to the City of Bakersfield, Native American Heritage Commission, and any other appropriate individuals, agencies, and/or groups as determined by the specialist in consultation with the City of Bakersfield to receive input regarding treatment and disposition of the resource, which may include avoidance, testing, and/or excavation to prevent destruction of the resource and/or to allow documentation of the resource for research potential. All reports, correspondence, and determinations regarding the discovery shall be submitted to the California Historical Resources Information System’s Southern San Joaquin Valley Information Center at California State University Bakersfield.
Level of Significance After Mitigation
Less than significant impact with mitigation incorporated.
Threshold CUL-3: Would the project disturb any human remains, including those interred outside of dedicated cemeteries?
Impact Analysis
The CRA did not identify any archeological resources on the Project Site, and due to the level of previous development, there is a low probability that intact surface or subsurface archaeological resources or human remains would be discovered during construction. However, as some development occurred before the implementation of regulations related to the identification of human remains, it is possible human remains were present within the Project Site and were not recorded before or during development. In the event that any human remains, or related resources are discovered, such resources would be treated in accordance with all applicable federal, state, and local regulations and guidelines for disclosure, recovery, relocation, and preservation, including State Health and Safety Code. If human remains are encountered during any project activities, State Health and Safety Code Section 7050.5 states that no further disturbance shall occur until the County Coroner has made a determination of origin and disposition pursuant to PRC Section 5097.98. As such, the Project would implement MM CUL-2, Inadvertent Discovery of Human Remains, requiring a cessation of construction activity until the County coroner can evaluate the discovery and made the necessary findings, would provide a process for treatment of any human remains inadvertently discovered during Project implementation. With implementation of this MM CUL-2, impacts to human remains would be less than significant with mitigation incorporated.
Mitigation Measures
The following mitigation measure is applicable to the Project and would be implemented to reduce impacts to a less than significant level.
Riverview Market Commercial Project
Environmental Impact Report 4.5 Cultural Resources
City of Bakersfield – SCH No. 2025101507 4.5-21
MM CUL-2 Inadvertent Discovery of Human Remains. During construction, if human remains are discovered, further ground disturbance shall be prohibited pursuant to California Health and Safety Code Section 7050.5.
The specific protocol, guidelines, and channels of communication outlined by the Native American Heritage Commission, in accordance with Health and Safety Code Section 7050.5, Public Resources Code 5097.97, and Senate Bill 447 shall be followed. In the event of the discovery of human remains, at the direction of the county coroner, Health and Safety Code Section 7050.5(c) shall guide Native American consultation. Unless otherwise required by law, the site of any reburial of Native American human remains or associated grave goods shall not be disclosed and shall not be governed by public disclosure requirements of the California Public Records Act. The coroner, pursuant to the specific exemption set forth in California Government Code Section 6254 (r), parties, and Lead Agencies, will be asked to withhold public disclosure information related to such reburial, pursuant to the specific exemption set forth in California Government Code Section 6254 (r).
Level of Significance After Mitigation
Less than significant with mitigation incorporated.
Cumulative Impacts
The geographic scope of the cumulative cultural resources analysis is the Project Site and surrounding area as evaluated in the CRA. Impacts to cultural resources are generally site-specific because the integrity of any specific cultural resource is often dependent upon the activities occurring in its immediate vicinity. As discussed in Section 4.5.4, Impact Analysis, none of the cultural resources identified on the Project Site have been determined to meet the definition of historic resources under CEQA, and thus, the Project would have neither a direct nor indirect impact on historical resources. Accordingly, the proposed Project would not contribute cumulatively to impacts to historic resources.
The cumulative projects identified in Section 3.3, Cumulative Development, would all likely require some level of excavation with potential for disturbance of subsurface archaeological resources or human remains. As discussed in discussion of Impact CUL-2 and Impact CUL-3, the proposed Project would implement MM CUL-1 and MM CUL-2 and comply with applicable regulations pertaining to the inadvertent discovery and proper treatment of these resources. This would reduce any potential impacts to less than significant. Likewise, the cumulative projects would be required to comply with applicable federal, State, and local regulations pertaining to these resources. Therefore, cumulative impacts are less than significant with mitigation incorporated.
Mitigation Measures
Implement MM CUL-1 and MM CUL-2.
Level of Significance After Mitigation
Cumulative impacts related to cultural resources would be less than significant with implementation of MM CUL-1 and MM CUL-2.
Riverview Marketplace Commercial Project
Environmental Impact Report 4.5 Cultural Resources
City of Bakersfield – SCH No. 2025101507 4.5-22
This page intentionally left blank.
City of Bakersfield – SCH No. 2025101507 4.6-1
4.6 Energy
This section of the Draft EIR addresses the potential impacts to energy associated with construction and operation of the proposed Project. This discussion includes information regarding the regulatory setting, the environmental setting, and potential impacts to energy. A technical report addressing energy was prepared for the proposed Project and is included as, Appendix B: Air Quality, Greenhouse Gas Emissions, and Energy Technical Study.
4.6.1 Regulatory Setting
Federal
Federal Energy Policy and Conservation Act
The Energy Policy and Conservation Act of 1975 was established in response to the 1973 oil crisis. The act created the Strategic Petroleum Reserve, established vehicle fuel economy standards, and prohibited the export of U.S. crude oil (with a few limited exceptions). It also created Corporate Average Fuel Economy (CAFE) standards for passenger cars starting in model year 1978. The CAFE Standards are updated periodically to account for changes in vehicle technologies, driver behavior, and/or driving conditions.
The federal government issued new CAFE standards in 2012 for model years 2017 to 2025, which required a fleet average of 54.5 miles per gallon (mpg) in 2025. On March 30, 2020, the EPA finalized the updated CAFE and greenhouse gas (GHG) emissions standards for passenger cars and light trucks and established new standards covering model years 2021 through 2026, known as the Safer Affordable Fuel Efficient (SAFE) Vehicles Final Rule for Model Years 2021 to 2026.
On December 21, 2021, under the direction of Executive Order 13990 issued by President Biden, the National Highway Traffic Safety Administration (NHTSA) repealed SAFE Vehicles Rule Part One, which had preempted State and local laws related to fuel economy standards. In addition, on March 31, 2022, the NHTSA finalized new fuel standards that will increase fuel efficiency by eight percent annually for model years 2024 to 2025 and by 10 percent for model year 2026.
Overall, the new CAFE standards require a fleet average of 49 mpg for passenger vehicles and light trucks for model year 2026, which will be a 10-mpg increase compared to model year 2021 (NHTSA 2022).
On June 7, 2024, the NHTSA announced final CAFE standards for passenger cars and light trucks built in model years 2027 to 2031 and final fuel efficiency standards for heavy-duty pickup trucks and vans built in model years 2030 to 2035. The final rules establish standards that would require an industry fleetwide average of approximately 50.4 mpg for passenger cars and light trucks in model year 2031, by increasing fuel economy by two percent year over year for passenger cars (model years 2027–2031) and for light trucks (model years 2029–2031). For heavy-duty pickup trucks and vans, the final rule would increase fuel efficiency at a rate of 10 percent per year (model years 2030–2032) and eight percent per year (model years 2033–2035) (NHTSA 2024).
In June 2025, NHTSA published a final rule, “Resetting the Corporate Average Fuel Economy Program.” The rule identifies factors statutorily prohibited from consideration when setting maximum feasible fuel economy standards under the Energy Policy and Conservation Act of 1975, the Energy Independence and Security Act of 2007, and other applicable laws. It also describes NHTSA’s authority to bring the CAFE program into compliance with relevant statutory requirements, in accordance with President Trump’s “Unleashing American Energy” Executive Order and the Secretary’s “Fixing the CAFE Program” Memorandum. The rule also describes Riverview Marketplace Commercial Project
Environmental Impact Report 4.6 Energy
City of Bakersfield – SCH No. 2025101507 4.6-2
NHTSA’s interpretation of its authority for a commercial medium- and heavy-duty on-highway vehicle and work truck fuel efficiency improvement program to establish the necessary legal foundation to bring that program into compliance with law. This rule itself does not change existing CAFE or medium- and heavy-duty standards. During the rulemaking process for replacement standards, NHTSA will exercise its enforcement authority regarding all existing CAFE and medium- and heavy-duty standards in accordance with the interpretation set forth in this rulemaking.
Energy Independence and Security Act of 2007
The Energy Independence and Security Act of 2007 (Public Law 110-140) seeks to provide the nation with greater energy independence and security by increasing the production of clean renewable fuels; improving vehicle fuel economy; and increasing the efficiency of products, buildings, and vehicles. It also seeks to improve the energy performance of the federal government. The Act set increased CAFE standards, the Renewable Fuel Standard, appliance energy efficiency standards, and building energy efficiency standards, and accelerated research and development tasks on renewable energy sources (e.g., solar energy, geothermal energy), carbon capture, and sequestration.
State
Warren-Alquist Act
Established in 1974, the Warren-Alquist Act created the California Energy Commission (CEC) in response to the energy crisis of the early 1970s and the state’s unsustainable growing demand for energy resources. The CEC’s core responsibilities include advancing State energy policy, encouraging energy efficiency, certifying thermal power plants, investing in energy innovation, developing renewable energy, transforming transportation, and preparing for energy emergencies. The Warren-Alquist Act is updated periodically through legislative bills to address current energy needs and issues.
Renewables Portfolio Standard
Senate Bills 1078, 107, and X1-2 and Executive Order S-14-08 The California Renewables Portfolio Standard (RPS) Program was established in 2002 under SB 1078 (Sher) and 107 (Simitian). The RPS program required investor-owned utilities, electric service providers, and community choice aggregators to increase the use of eligible renewable energy resources to 33 percent of total procurement by 2020. Initially, certain retail sellers of electricity were required to increase the amount of renewable energy each year by at least one percent in order to reach at least 20 percent by December 30, 2010. Executive Order S-14-08 was signed in November 2008 and expanded the state’s Renewable Energy Standard to 33 percent renewable power by 2020. This standard was adopted by the legislature in 2011 (SB X1-2). The California Public Utilities Commission is required to provide quarterly progress reports on RPS goals. This has accelerated the development of renewable energy projects throughout the state. For the year 2020, the three largest retail energy utilities provided an average of 43 percent of their supplies from renewable energy sources. Community choice aggregators provided an average of 41 percent of their supplies from renewable sources.
Riverview Marketplace Commercial Project
Environmental Impact Report 4.6 Energy
City of Bakersfield – SCH No. 2025101507 4.6-3
Senate Bill 350
Senate Bill 350 (De Leon) was signed into law in September 2015. SB 350 establishes tiered increases to the RPS of 40 percent by 2024, 45 percent by 2027, and 50 percent by 2030. SB 350 also set a new goal to double the energy efficiency savings in electricity and natural gas through energy efficiency and conservation measures.
Senate Bill 100
On September 10, 2018, Governor Brown signed SB 100, which replaced SB 350 requirements.
Under SB 100, the RPS for public-owned facilities and retail sellers consists of 44 percent renewable energy by 2024, 52 percent by 2027, and 60 percent by 2030. SB 100 also established a new RPS requirement of 50 percent by 2026. The bill establishes an overall state policy that eligible renewable energy resources and zero-carbon resources supply 100 percent of all retail sales of electricity to California end-use customers and 100 percent of electricity procured to serve all state agencies by December 31, 2045. Under the bill, the state cannot increase carbon emissions elsewhere in the western grid or allow resource shuffling to achieve the 100 percent carbon-free electricity target.
Senate Bill 1020
SB 1020 was signed into law on September 16, 2022. It requires renewable energy and zero-carbon resources to supply 90 percent of all retail electricity sales by 2035 and 95 percent by 2040. Additionally, SB 1020 requires all state agencies to procure 100 percent of electricity from renewable energy and zero-carbon resources by 2035.
California Building Code: Building Energy Efficiency Standards Energy conservation standards for new residential and nonresidential buildings were adopted by the California Energy Resources Conservation and Development Commission (now the CEC) in June 1977 (24 California Code of Regulations [CCR] Part 6). Part 6 requires the design of building shells and building components to conserve energy. The standards are updated periodically to allow for consideration and possible incorporation of new energy-efficiency technologies and methods.
The 2022 Building Energy Efficiency Standards were adopted on August 11, 2021, and went into effect on January 1, 2023. The 2022 standards encourage efficient electric heat pumps, establish electric-ready requirements for new homes, expand solar photovoltaic (PV) and battery storage standards, strengthen ventilation standards, and more. The 2022 standards require mixed-fuel single-family homes to be electric-ready to accommodate the replacement of gas appliances with electric appliances. In addition, the standards also include prescriptive PV system and battery requirements for high-rise, multifamily buildings (i.e., more than three stories) and noncommercial buildings such as hotels, offices, medical offices, restaurants, retail stores, schools, warehouses, theaters, and convention centers (CEC 2021). The 2025 Building Energy Efficiency Standards were adopted on September 24, 2024, and became effective and replaced the 2022 Building Energy Efficiency Standards on January 1, 2026. Updates under the 2025 Building Energy Efficiency Standards include electric-ready requirements for some multi-family buildings and commercial kitchens, and solar and battery energy storage requirements for assembly buildings, including religious worship, sports, and recreational buildings.
Under the prescriptive pathway, a new development’s building design is considered the “Standard Design Building,” which represents the energy-efficiency performance of that project should it Riverview Marketplace Commercial Project
Environmental Impact Report 4.6 Energy
City of Bakersfield – SCH No. 2025101507 4.6-4
include all prescribed features (e.g., solar, battery storage) with no additional energy-efficiency features beyond what is required at minimum under the mandatory requirements and prescriptive pathway. A project may still demonstrate compliance using the performance pathway without inclusion of prescriptive features like solar or battery storage. However, that building design must match or exceed the energy efficiency performance of the Standard Design Building. For example, if a project would be required to include solar and battery storage under the prescriptive pathway, it can choose to comply with the performance pathway and not include solar and battery storage so long as it can demonstrate that it would achieve the same energy-efficiency performance as if solar and battery storage were included.
California Building Code: CALGreen
On July 17, 2008, the California Building Standards Commission adopted the nation’s first green building standards. The California Green Building Standards Code (24 CCR, Part 11), or “CALGreen,” was adopted as part of the California Building Standards Code. CALGreen established planning and design standards for sustainable site development, energy efficiency (in excess of the California Energy Code requirements), water conservation, material conservation, and internal air contaminants.1 The mandatory provisions of CALGreen became effective January 1, 2011, and were last updated in 2025. The 2025 CALGreen standards became effective January 1, 2026.
Section 5.408 of CALGreen also requires that at least 65 percent of the nonhazardous construction and demolition waste from nonresidential construction operations be recycled and/or salvaged for reuse.
2006 Appliance Efficiency Regulations
The 2006 Appliance Efficiency Regulations (20 CCR Sections 1601–1608) were adopted by the CEC on October 11, 2006, and approved by the California Office of Administrative Law on December 14, 2006. The regulations include standards for both federally regulated appliances and non–federally regulated appliances. Though these regulations are now often viewed as “business as usual,” they exceed the standards imposed by all other states, and they reduce GHG emissions by reducing energy demand.
Local
Metropolitan Bakersfield General Plan
The General Plan, dated December 2002, was updated in January 2016 per Resolution No. 018- 16 and 019-16. At the time this EIR was published for public review, the City was in the process of updating its Bakersfield 2045 General Plan, but it had not yet been adopted. Chapter V, “Conservation/Air Quality Element,” of the Metropolitan Bakersfield General Plan contains the following energy-related policies that may apply to the Project:
Policy 6. Participate in alternative fuel programs.
Policy 29. Encourage the use of alternative fuel and low or zero-emission vehicles. 1 The green building standards became mandatory in the 2010 edition of the code.
Riverview Marketplace Commercial Project
Environmental Impact Report 4.6 Energy
City of Bakersfield – SCH No. 2025101507 4.6-5
4.6.2 Environmental Setting
The Project Site is currently undeveloped and highly disturbed and does not generate energy demands. The Project Site is in the Pacific Gas and Electric Company (PG&E) service area for both electricity and natural gas. PG&E is a publicly traded utility company that generates, purchases, and transmits energy under contract with the California Public Utilities Commission.
Its service territory is 70,000 square miles, extending north to south from Eureka to Bakersfield, and east to west from the Sierra Nevada range to the Pacific Ocean.
Electricity
The electricity distribution system of PG&E consists of 106,681 circuit miles of electric distribution lines and 18,466 circuit miles of interconnected transmission lines. PG&E electricity is generated by a combination of sources such as coal-fired power plants, nuclear power plants, and hydroelectric dams as well as newer sources of energy, such as wind turbines and photovoltaic plants or “solar farms.” “The grid,” or bulk electric grid, is a network of high-voltage transmission lines linked to power plants in the PG&E system. The distribution system consists of lower-voltage secondary lines at the street and neighborhood level, with overhead or underground distribution lines, transformers, and individual service “drops” that connect to the individual customer.
Total electricity consumption in PG&E’s service area was 75,338 gigawatt-hours in 2024. One gigawatt-hour is equivalent to one million kilowatt-hours (kWh). Sources of electricity sold by PG&E for its base plan in 2024, the latest year for which data are available, were:
• 23 percent renewable, consisting mostly of solar and wind • 12 percent of large hydroelectric
• 2 percent natural gas
• 63 percent nuclear
Natural Gas
PG&E gas transmission pipeline systems serve approximately 4.5 million gas customers in northern and central California. The system is operated under an inspection and monitoring program. The system operates in real time on a 24-hour basis and includes leak inspections, surveys, and patrols of the pipelines. PG&E also adopted the Pipeline 2020 program, which aims to modernize critical pipeline infrastructure, expand the use of automatic or remotely operated shut-off valves, catalyze development of next-generation inspection technologies, develop industry-leading best practices, and enhance public safety partnerships with local communities, public officials, and first responders. Total natural gas consumption in PG&E’s service area was 4,255 million therms for 2024.
Transportation Fuels
California contains a network of crude oil pipelines that connects production areas to oil refineries in the Los Angeles area, the San Francisco Bay Area, and the Central Valley. California oil refineries also process Alaskan and foreign crude oil received in ports in Los Angeles, Long Beach, and the San Francisco Bay Area. Crude oil production in California and Alaska is in decline, and California refineries have become increasingly dependent on foreign imports.
Foreign supplies, led by Iraq, Brazil, and Guyana in 2024, provide over half of the crude oil refined in California. According to the United States Energy Information Administration, California’s field Riverview Marketplace Commercial Project
Environmental Impact Report 4.6 Energy
City of Bakersfield – SCH No. 2025101507 4.6-6
production of crude oil has steadily declined since the mid-1980s, with a total production of approximately 110 million barrels in 2024. In Kern County, including all incorporated cities, approximately 406 million gallons of gasoline and 225 million gallons of diesel fuel were sold in 2024, the latest year of available data.
4.6.3 Impact Analysis
Methodology
The analysis of electricity and natural gas usage for the proposed project is based on the California Emissions Estimator Model (CalEEMod) version 2022.1, which quantifies energy use associated with proposed land uses. In addition, fuel consumption data from EMFAC2021 version
1.0.2 and OFFROAD version 1.1.3. are used to quantify fuel usage related to construction equipment operation and construction- and operation-related vehicle trips (e.g., construction worker trips and patron vehicle trips).
The operational-phase, project-related emissions are based on the development of the new proposed commercial and retail land uses. The modeling accounts for the average daily vehicle trips generated, energy usage, water demand, and wastewater and solid waste generation from operation of the proposed project. Construction emissions are based on information provided for the Project. Where specific information was not available, CalEEMod default values were utilized.
Thresholds of Significance
The City utilizes the California Environmental Quality Act (CEQA) Guidelines, Appendix G, and thresholds of significance2to analyze the environmental impacts of the Project. Per CEQA Guidelines, an impact is considered significant if the Project would:
• Result in potentially significant environmental impact due to wasteful, inefficient, or unnecessary consumption of energy resources during project construction or operation; or
• Conflict with or obstruct a state or local plan for renewable energy or energy efficiency.
Project Impacts
Threshold ENG-1: Would the project result in potentially significant environmental impact due to wasteful, inefficient, or unnecessary consumption of energy resources during project construction or operation? Impact Analysis
Construction
Construction of the proposed project would create temporary increased demands for electricity and vehicle fuels compared to existing conditions and would result in short-term energy use from off-road mobile equipment and on-road vehicles.
Construction Equipment Electrical Energy
Construction of the Project would not require electricity to power most construction equipment.
Electricity use during the construction of the proposed Project would vary during different phases 2 Association of Environmental Professionals (AEP). 2025. CEQA Guidelines Appendices, Appendix G: Environmental Checklist Form. Available at: https://www.califaep.org/docs/CEQA_Handbook_2025combined.pdf. Accessed January 2026.
Riverview Marketplace Commercial Project
Environmental Impact Report 4.6 Energy
City of Bakersfield – SCH No. 2025101507 4.6-7
of construction. The majority of construction equipment would be gasoline or diesel-powered.
Later construction phases (e.g., vertical building construction) could result in the use of electricity-powered equipment for interior construction and architectural coatings. However, while not quantified, it is anticipated that the majority of electric-powered construction equipment would be hand tools (e.g., power drills, table saws) and lighting, which would result in minimal electricity usage during construction activities. Additionally, it is anticipated that such equipment would be used on an as-needed basis. Therefore, project-related construction activities would not result in wasteful or unnecessary electricity demands.
Construction Equipment Natural Gas Energy
It is not anticipated that construction equipment used for the Project would be powered by natural gas, and no other natural gas demand is anticipated during construction. Therefore, project-related construction activities would not result in wasteful or unnecessary natural gas usage.
Off-Road and On-Road Transportation Energy
Transportation energy use during the construction of the proposed Project would come from delivery vehicles, haul trucks, and construction employee vehicles, as well as off-road construction equipment. It is anticipated that the majority of off-road construction equipment, such as what is used during demolition and grading, would be gas or diesel-powered. The use of energy resources by these vehicles would fluctuate according to the phase of construction. Fuel consumption during construction (years 2026 through 2027) was calculated based on fuel consumption data from the EMFAC2021 (v. 1.0.2) and OFFROAD (v. 1.1.3) databases. The results are shown in Table 4.6-1, Construction-Related Fuel Usage.
Riverview Marketplace Commercial Project
Environmental Impact Report 4.6 Energy
City of Bakersfield – SCH No. 2025101507 4.6-8
Table 4.6-1 – Construction-Related Fuel Usage
Project Component
Gas Diesel Electricity
VMT Gallons VMT Gallons VMT kWh
Construction Worker Commute
Phase 1 317,886 12,000 452 12 9,053 3,299
Phase 2 196,259 7,261 266 7 6,280 2,290
Left-Turn Lane 317,886 12,000 452 12 9,053 3,299
Traffic Signal Installation 196,259 7,261 266 7 6,280 2,290 Subtotal 522,393 19,572 729 19 15,568 5,675
Construction Vendor Trips
Phase 1 3,516 733 50,463 6,922 0 0
Phase 2 1,067 220 15,980 2,160 0 0
Left-Turn Lane 3,516 733 50,463 6,922 0 0
Traffic Signal Installation 1,067 220 15,980 2,160 0 0
Subtotal 4,676 972 67,769 9,264 0 0
Construction Truck Haul and Onsite Truck Trips
Phase 1 0 0 25 4 0 0
Phase 2 0 0 23 4 0 0
Left-Turn Lane 0 0 25 4 0 0
Traffic Signal Installation 0 0 23 4 0 0
Subtotal 0 0 2,947 467 0 0
Construction Off-Road Equipment
Phase 1 N/A 744 N/A 10.265 N/A 0
Phase 2 N/A 272 N/A 8,350 N/A 0
Left-Turn Lane N/A 14 N/A 625 N/A 0
Traffic Signal Installation N/A 0 N/A 167 N/A 0
Subtotal N/A 1,030 N/A 19,827 N/A 0
Total 527,069 21,574 71,446 29,578 15,568 5,675
Sources: Appendix B
Notes: VMT=vehicle miles traveled; kWh=kilowatt hour
To limit wasteful and unnecessary energy consumption from transportation, the construction contractors would minimize nonessential idling of construction equipment during construction in accordance with 13 CCR Article 4.8, Chapter 9, Section 2449, which limits nonessential idling of diesel-powered off-road equipment to five minutes. In addition, the Project Site is served by numerous regional freeway systems (e.g., State Routes 99, 58, and 178) that provide the most direct routes from various areas of the region. Moreover, all construction equipment would cease operating upon completion of the Project construction. Thus, energy use during the construction of the proposed Project would not be considered inefficient, wasteful, or unnecessary.
Operation
Operation of the proposed project would create additional demands for electricity and natural gas compared to existing conditions and would result in increased transportation energy use.
Operational energy use would include heating, cooling, and ventilation of buildings; water heating; Riverview Marketplace Commercial Project
Environmental Impact Report 4.6 Energy
City of Bakersfield – SCH No. 2025101507 4.6-9
operation of electrical systems; use of on-site equipment and appliances; and indoor, outdoor, perimeter, and parking lot lighting.
Electrical Energy
Operation of the proposed Project would consume electricity for various purposes, including but not limited to cooling and ventilation of buildings; operation of electrical systems; lighting; and use of on-site equipment and appliances. Electrical service to the proposed Project would be provided by PG&E through connections to existing off-site electrical lines and new on-site infrastructure.
As shown in Table 4.6-2, Project Grid Electricity Demand, the proposed Project would have a total electricity demand of 5,968,579 kilowatt-hours per year (kWh/yr).
Table 4.6-2: Project Electricity Demand
Land Use Electricity (kWh/year)1,2
Regional Shopping Center3 2,335,726
Medical Office 214,042
Convenience Mart/Gas Station 25,106
Fast Food Restaurant w/Drive Thru 753,849
Automated Carwash 48,643
Public Storage 429,593
Parking Lot 959,688
Renewable Electricity from Onsite PV Systems1
1,201,933
Project Total 5,968,579
Source: Appendix B
1 Based on information provided by the project applicant. 2 Accounts for total electricity use from proposed buildings and parking lots. See Appendix B. 3 The shown electricity demand represents the CalEEMod default electricity demand of 3,537,659 kWh per year minus the anticipated 1,201,933 kWh per year of renewable electricity that would be generated from the proposed on-site PV systems.
While the proposed Project would result in electricity demand, it would be designed and built to meet the current Building Energy Efficiency Standards and CALGreen, which would contribute to increasing energy efficiency. In accordance with the 2025 Building Energy Efficiency Standards, the proposed Project would install rooftop PV systems and battery storage systems. These systems would contribute an estimated 1,201,933 kWh/yr of onsite renewable electricity to offset a portion of the Project's electricity demand from the grid. The on-site PV systems and battery storage—in addition to compliance with the RPS requirements by PG&E to increase electricity from renewable sources in the coming years—would further increase renewable electricity use.
Furthermore, compliance with CALGreen would contribute to reducing indoor water use, which would also contribute to minimizing electricity demand from the transport and distribution of water.
Thus, electricity use from the operation of the proposed Project would not be considered inefficient, wasteful, or unnecessary.
Natural Gas Energy
The proposed project would generate demand for natural gas due to the heating and cooling of the buildings and for water. As shown in Table 4.6-3, Project Natural Gas Demand, the proposed land uses would generate a natural gas demand of 6,150,142 kilobritish thermal units per year (kBTU/yr) under full buildout conditions. Development pursuant to the proposed Project would result in a net increase in natural gas demand. However, the proposed Project would be built to Riverview Marketplace Commercial Project
Environmental Impact Report 4.6 Energy
City of Bakersfield – SCH No. 2025101507 4.6-10
meet the current Building Energy Efficiency Standards and CALGreen, which would contribute to optimizing the energy efficiency of the proposed buildings. For example, building insulation requirements would contribute to minimizing the use of natural gas for heating. Thus, overall, the proposed project would not result in wasteful or unnecessary natural gas demands.
Table 4.6-3: Project Natural Gas Demand
Land Use Electricity (kWh/year)1,2
Regional Shopping Center 3,280,464
Medical Office 364,604
Convenience Mart/Gas Station 14,278
Fast Food Restaurant w/Drive Thru 2,109,444
Automated Carwash 167,987
Public Storage 213,366
Parking Lot 0
Project Total 6,150,142
Source: Appendix B
Note: kBTU = kilo British thermal units
1 Based on information provided by the project applicant. 2 Accounts for total natural gas use from proposed buildings. See Appendix B Transportation Energy
The proposed Project would consume long-term transportation-related energy during operations from the use of motor vehicles. Estimates of transportation energy use are based on the overall vehicle miles travels (VMT) and EMFAC2021 fuel consumption data. Project-related vehicle trips would primarily be generated from customers and employees. Additional vehicle trips to the Project Site would include deliveries, waste pickup, and maintenance trips.
Table 4.6-4, Project Annual Operation-Related Fuel Usage, shows the annual energy usage from Project-related vehicle trips at full buildout. While the operation of the proposed Project would result in energy usage, the Project Site is within a half mile of bus stops for three Golden Empire Ticket bus routes (Routes 61, 82, and 84) and would be accessible from the existing surrounding sidewalks and class II bike lanes along Rosedale Highway and Coffee Road (IEG 2026). The proposed Project would also provide bicycle parking and lockers. These amenities could contribute to minimizing vehicle trips and VMT. In addition, fuel efficiency standards for automobiles are established nationwide under the CAFE standards, which are not directly applicable to residents or land use development projects, but to car manufacturers. Thus, future customers and employees of the proposed Project and the general population in the region do not have direct control in determining the fuel efficiency of vehicles manufactured and that are made available. However, compliance with the CAFE standards by car manufacturers would ensure that vehicles produced in future years have greater fuel efficiency and would generally result in an overall benefit of reducing fuel usage by providing the population of the City and region with more fuel-efficient vehicle options. Thus, the assumed and forecast general fuel efficiency based on EMFAC2021 data used to quantify Project-related transportation energy usage in Table
4.6-4 also applies to the population at large, and vehicles driven by Project customers and employees would not be any less efficient than the vehicles driven by the general population.
Thus, it is expected that operation-related fuel usage associated with the Project would not be considered inefficient, wasteful, or unnecessary.
Riverview Marketplace Commercial Project
Environmental Impact Report 4.6 Energy
City of Bakersfield – SCH No. 2025101507 4.6-11
Table 4.6-4: Project Annual Operation-Related Fuel Usage Source
Gasoline Diesel CNG Electricity
Annual
VMT1
Annual
Gallons
Annual
VMT1
Annual
Gallons
Annual
VMT1
Annual
Gallons
Annual
VMT1
Annual
kWh
Project
Vehicle
Trips
32,807,847 1,328,437 2,787,487 251,080 10,571 313 1,856,622 646,405 Source: Appendix B
Overall, the construction and operation of the proposed Project would not result in the inefficient, wasteful, or unnecessary consumption of energy. The Project would not cause or result in the need for additional energy-producing or transmission facilities. Therefore, any impact would be less than a significant impact.
Mitigation Measures
None required.
Level of Significance After Mitigation
Less than significant with no mitigation required.
Threshold ENG-2: Would the project conflict with or obstruct a state or local plan for renewable energy or energy efficiency?
Impact Analysis
The following evaluates the consistency of the proposed project with California’s RPS program.
California Renewables Portfolio Standard
The statewide RPS goal is not directly applicable to individual development projects, but to utilities and energy providers such as PG&E, which would provide all of the electricity needs for the proposed Project. Compliance of PG&E in meeting the RPS goals would ensure that the State meets its objective of transitioning to renewable energy. The proposed Project would be subject to the 2025 Building Energy Efficiency Standards and, in compliance with those standards, would install battery storage and rooftop PV systems. These systems would support the RPS program and the statewide transition to renewable energy. Therefore, implementation of the Project would not conflict with or obstruct plans for renewable energy and energy efficiency.
Accordingly, any impact would be less than significant.
Mitigation Measures
None required.
Level of Significance After Mitigation
Less than significant with no mitigation required.
Cumulative Impacts
The area considered for cumulative impacts to electricity and natural gas supplies is the service area of PG&E. Other projects in the PG&E service area would be required to comply with the Building Energy Efficiency Standards and CALGreen, which would contribute to minimizing Riverview Marketplace Commercial Project
Environmental Impact Report 4.6 Energy
City of Bakersfield – SCH No. 2025101507 4.6-12
wasteful energy consumption and promoting renewable energy sources. As discussed in impact discussion ENG-1, construction- and operation-related energy impacts caused by the Project would not be considered inefficient, wasteful, or unnecessary. The Project would therefore not contribute to any cumulative energy impacts when considered together with cumulative development projects and would not be cumulatively considerable.
Mitigation Measures
No mitigation measures are required as impacts would be less than significant.
Level of Significance After Mitigation
No mitigation measures are required as impacts would be less than significant.
City of Bakersfield – SCH No. 2025101507 4.7-1
4.7 Geology and Soils
This Section discusses any potential environmental impacts associated with geology and soils that may result from implementation of the proposed Riverview Marketplace Commercial Project (Project). Potential effects are evaluated based on the Project’s potential to result in substantial either direct or indirect adverse physical impacts, including risk of loss, injury or death, associated with known earthquake faults, seismic ground-shaking or ground failure, landslides, soil erosion, unstable geologic unit, expansive soils, soil stability for septic systems, as well as paleontological resources. This Section evaluates potential impacts on geology and soils and identifies measures to reduce or avoid significant impacts.
The analysis is based on a review of relevant regulatory setting, existing conditions, and a discussion of the thresholds used to determine whether the Project would result in significant impacts to geology and soils. Information in this Section is based, in part, on the Metropolitan Bakersfield General Plan (General Plan); the City of Bakersfield (City) Municipal Code (BMC) Title 17 (Zoning Ordinance);a Geotechnical Investigation prepared for the Project by Geotechnical Professionals, Inc., dated December 2025, included in Appendix E, Geotechnical Investigation, to this Draft EIR; and a Paleontological Overview prepared for the Project by the Western Science Center. The Paleontological Resources Overview is included in the Cultural Resources Assessment (CRA) prepared for the Project by BCR Consulting (BCR), dated February 14, 2025, and included in Appendix D, Cultural Resources Assessment, to this Draft EIR.
During the scoping period for the Project’s Environmental Impact Report (EIR), no comments were received in response to the Notice of Preparation (NOP) regarding geology and soils.
4.7.1 Regulatory Setting
Federal
Earthquake Hazards Reduction Act
The Earthquake Hazards Reduction Act of 1977 (Public Law 95-124) established the National Earthquake Hazards Reduction Program (Program) which is coordinated through the Federal Emergency Management Agency (FEMA), the United States Geological Survey (USGS), the National Science Foundation, and the National Institute of Standards and Technology.
The purpose of the Program is to establish measures for earthquake hazards reduction and promote the adoption of earthquake hazards reduction measures by federal, State, and local governments; national standards and model code organizations; architects and engineers; building owners; and others with a role in planning and constructing buildings, structures, and lifelines through:
(1) Grants, contracts, cooperative agreements, and technical assistance; (2) Development of standards, guidelines, and voluntary consensus codes for earthquake hazards reduction for buildings, structures, and lifelines; and (3) Development and maintenance of a repository of information, including technical data on seismic risk and hazards reduction.
Riverview Marketplace Commercial Project
Environmental Impact Report 4.7 Geology and Soils
City of Bakersfield – SCH No. 2025101507 4.7-2
The Program is intended to improve the understanding of earthquakes and their effects on communities, buildings, structures, and lifelines through interdisciplinary research that involves engineering, natural sciences, and social, economic, and decisions sciences.
National Pollutant Discharge Elimination System Permit
The National Pollutant Discharge Elimination System (NPDES) permit program was established by the CWA to regulate municipal and industrial discharges to surface waters of the United States from their municipal separate storm sewer systems (MS4s). Federal NPDES permit regulations have been established for a broad range of discharges, including point-source municipal waste discharges and non-point-source stormwater runoff. NPDES permits generally identify effluent and receiving water limits on allowable concentrations and/or mass emissions of pollutants contained in the discharge; prohibitions on discharges not specifically allowed under the permit; and provisions that describe required actions by the discharger, including industrial pretreatment, pollution prevention, self-monitoring, and other activities.
State
Alquist-Priolo Earthquake Fault Zoning Act of 1972
The Alquist-Priolo Earthquake Fault Zoning Act (Public Resources Code [PRC], Section 2621 et seq.), regulates development and construction of buildings intended for human occupancy to avoid the hazard of surface fault rupture. The Alquist-Priolo Earthquake Fault Zoning Act categorizes faults as active, potentially active, and inactive. Historic and Holocene age faults are considered active, Late Quaternary and Quaternary age faults are considered potentially active, and pre‐Quaternary age faults are considered inactive. These classifications are qualified by the conditions that a fault must be shown to be “sufficiently active” and “well defined” by detailed site‐ specific geologic explorations to determine whether building setbacks should be established.
Seismic Hazards Mapping Act
The Seismic Hazards Mapping Act of 1990 (PRC, Sections 2690–2699), directs the California Department of Conservation (DOC) and California Geological Survey (CGS) to delineate Seismic Hazard Zones. The purpose of the Seismic Hazards Mapping Act is to reduce the threat to public health and safety and to minimize the loss of life and property by identifying and mitigating seismic hazards. Cities, counties, and State agencies are directed to use seismic hazard zone maps developed by CGS in their land‐use planning and permitting processes. The act requires that site-specific geotechnical investigations be performed prior to permitting most urban development projects within seismic hazard zones.
California Building Standards Code
The California Building Code (CBC) (California Code of Regulations [CCR], Title 24, Part 2), establishes minimum requirements for a building’s structural strength and stability to safeguard the public health, safety, and general welfare. Title 24 is assigned to the California Building Standards Commission, which, by law, is responsible for coordinating all building standards.
Section 19100 et seq. of the California Health and Safety Code establishes the State’s regulations for earthquake protection. This Section of the code requires structural designs to be capable of resisting likely stresses produced by phenomena such as strong winds and earthquakes.
Riverview Marketplace Commercial Project
Environmental Impact Report 4.7 Geology and Soils
City of Bakersfield – SCH No. 2025101507 4.7-3
Public Resources Code Sections 5097.5 and 30244
CEQA provides guidance relative to significant impacts on paleontological resources, indicating that a project would have a significant impact on paleontological resources if it disturbs or destroys a unique paleontological resource or site, or unique geologic feature. Requirements for paleontological resource management are included in PRC, Division 5, Chapter 1.7, Section 5097.5, and Division 20, Chapter 3, Section 30244, which state:
No person shall knowingly and willfully excavate upon, or remove, destroy, injure or deface any historic or prehistoric ruins, burial grounds, archaeological or vertebrate paleontological site, including fossilized footprints, inscriptions made by human agency, or any other archaeological, paleontological or historical feature, situated on public lands, except with the express permission of the public agency having jurisdiction over such lands. Violation of this section is a misdemeanor.
These statutes prohibit the removal, without permission, of any paleontological site or feature from lands under the jurisdiction of the state or any city, county, district, authority, or public corporation, or any agency thereof. Consequently, local agencies are required to comply with PRC Section 5097.5 for their own activities, including construction and maintenance, as well as for permit actions (e.g., encroachment permits) undertaken by others. PRC Section 5097.5 also establishes the removal of paleontological resources as a misdemeanor and requires reasonable mitigation of adverse impacts to paleontological resources from developments on public (state, county, city, and district) lands.
Further, California Penal Code Section 622.5 sets the penalties for damage or removal of paleontological resources. CEQA documentation prepared for projects is required to analyze paleontological resources as a condition of the CEQA process to disclose potential impacts. As of January 2018, paleontological resources are considered in the geological rather than cultural category.
Local
Metropolitan Bakersfield General Plan
The General Plan, dated December 2002, was updated in January 2016 per Resolution No. 018- 16, 019-16. At the time this EIR was published for public review, the City was in the process of updating its General Plan, but it had not yet been adopted. The General Plan includes goals, policies, and directions to achieve the City’s vision of the community and future development. The General Plan includes 12 elements that focus on: Land Use; Circulation; Housing; Conservation; Noise; Safety; Downtown Redevelopment; Public Services Facilities; Parks; Open Space; Kern River Plan; and Historical Resources.
The General Plan established the following goals and policies in order to protect the City’s geologic resources and ensure soil stability.
Land Use Element
LAND/GEN-G-6 Accommodate new development that is sensitive to the natural environment, and accounts for environmental hazards.
Conservation Element
CON/SOILS-P-6 Continue implementing land grading ordinances that reduce soil erosion/siltation commonly associated with land development Riverview Marketplace Commercial Project
Environmental Impact Report 4.7 Geology and Soils
City of Bakersfield – SCH No. 2025101507 4.7-4
CON/SOILS-P-7 Land use patterns, grading, and landscaping practices shall be designed to prevent soil erosion while retaining natural watercourses when possible (l-4).
CON/SOILS-P-11 Encourage property owners to improve or preserve soil conditions CON/SOILS-P-12 Prohibit premature removal of ground cover in advance of development and require measures to prevent soil erosion during and immediately after construction
Safety Element
SAFE/GEN-G-1 To develop sustainable communities to preserve life, protect property, the environment, and the economy from natural hazards.
SAFE/GEN-P-1 The adopted Kern County, California Multi-Hazard Mitigation Plan is incorporated by reference. This multi-jurisdictional plan, approved in compliance with the Disaster Mitigation Act of 2000, provides long-term planning to reduce the impacts of future disasters.
SAFE/PS-G-1 Substantially reduce the level of death, injury, property damage, economic and social dislocation and disruption of vital services that would result from earthquake damage.
SAFE/PS-G-7 Protect land uses from the risk of dam failure inundation including the assurances that: the functional capabilities of essential facilities are available in the event of a flood; hazardous materials1 are not released; effective measures for mitigation of dam failure inundation are incorporated into the design of critical facilities; and the rapid and orderly evacuation of populations in the inundation area will occur.
SAFE/PS-P-8 Require seismic review of other potentially hazardous buildings upon any change in their use or occupancy status.
SAFE/PS-P-9 Adopt and maintain high standards for seismic performance of buildings, through prompt adoption and careful enforcement of the most current seismic standards of the Uniform Building Code.
SAFE/PS-P-10 Prohibit development designed for human occupancy within 50 feet of a known active fault and prohibit any building from being placed astride an active fault.
SAFE/PS-P-11 Require site-specific studies to locate and characterize specific fault traces within an Alquist-Priolo Earthquake Fault Zone for all construction designed for human occupancy.
SAFE/PS-P-13 Determine the liquefaction potential at sites in areas of high groundwater prior to development and determine specific mitigation to be incorporated into the foundation design, as necessary to prevent or reduce damage from liquefaction in an earthquake.
SAFE/PS-P-15 Compile information on areas of potential hazards and field information developed as part of CEQA investigations and geologic reports and keep geologic reviews and policy development current and accessible for use in report preparation.
1 Hazardous materials are defined as injurious substances, including pesticides, herbicides, toxic metals and chemicals, liquified natural gas, explosives, volatile chemicals, and nuclear fuels.
Riverview Marketplace Commercial Project
Environmental Impact Report 4.7 Geology and Soils
City of Bakersfield – SCH No. 2025101507 4.7-5
Kern County Multi-Jurisdictional Hazard Mitigation Plan The Kern Multi-Jurisdictional Hazard Mitigation Plan (MJHMP) was approved by FEMA on April 9, 2021. The Kern MJHMP provides an explanation of prevalent hazards within the County and how hazards may affect the County, participating cities and special districts differently based upon proximities to natural hazards. It also identifies risks to vulnerable assets, both people and property. The mitigation strategy presented in the Kern MJHMP responds to the identified vulnerabilities within each community and provides prescriptions or actions to achieve the greatest risk reduction based upon available resources. The County and participating jurisdictions intend to save lives, reduce injuries, reduce property damage, and protect natural resources for future generations through mitigation activities.2 The City has its own participating jurisdiction annex report that contained individually assessed hazards, explored hazard vulnerability, developed mitigation strategies, and followed the same planning process as County to create the annexes.
City of Bakersfield Municipal Code
The City of Bakersfield Municipal Code adopts the 2025 CBC in Section 15.05.010. The City’s Building Division is responsible for promoting health and safety in the construction and maintenance of buildings and structures, and the maintenance of property through the enforcement of uniform building construction codes, conservation standards, regulations, and ordinances, including the CBC and the City’s adopted policies, ordinances, and standards.
According to the Geotechnical Investigation prepared for the Project (Appendix E), the Project Site is classified as Seismic Design Category (SDC) D. Under the CBC, sites classified as SDC D require a mandatory geotechnical investigation for most new construction. The investigation must analyze slope instability, liquefaction, soil strength loss, and total/differential settlement.
4.7.2 Environmental Setting
A Geotechnical Investigation was prepared for the proposed Project by Geotechnical Professionals Inc. and is included as Appendix E, Geotechnical Investigation, of this Draft EIR.
The purpose of the Geotechnical Investigation is to provide an evaluation of the existing geotechnical conditions at the site as they relate to the design and construction of the proposed development. More specifically, this investigation was aimed at providing geotechnical recommendations for earthwork, and design of foundations.
Regional Geology
The Project Site is located within the City, which is located near the eastern edge of the broad San Joaquin Valley (Valley), at the base of the Sierra Nevada Mountain Range. The Valley is filled with thick sediments eroded from the mountains on both sides.3 Surface Conditions
The Project Site is “L” shaped with the northern property line bordering Rosedale Highway, and the eastern property line bordering Coffee Road. The eastern portion of the site is bound by a gravel-paved staging/storage area to the south and a Pacific Gas and Electric Company (PG&E) 2 County of Kern. 2021. Kern Multi-Jurisdictional 2020 MJHMP Update. Available at:
https://psbweb.kerncounty.com/planning/pdfs/MJHMP/Volumes/Volume1.pdf. Accessed March 2026. 3 City of Bakersfield. 2002. Metropolitan Bakersfield General Plan. Available at: https://www.bakersfieldcity.us/271/Adopted-Planning-Documents. Accessed March 2026.
Riverview Marketplace Commercial Project
Environmental Impact Report 4.7 Geology and Soils
City of Bakersfield – SCH No. 2025101507 4.7-6
substation/Kern Power Plant to the west. The western portion of the site is bound by El Toro Viejo Road and a fast-food restaurant at the corner of El Toro Viejo Road and Rosedale Highway to the north, and the PG&E substation/Kern Power Plant to the south.
The Project Site is relatively flat with ground surface elevations ranging from about 381 feet on the western portion of the site to 390 feet in the eastern portion of the Project Site. The Project Site is predominately undeveloped with the eastern portion being used as staging/storage area, large power poles and electrical lines cross the middle of the site spanning from the PG&E substation to Rosedale Highway. The ground surface is predominately soil with some small weeds spread across the Project Site and gravel access/staging areas within the eastern portion of the site. Within the western third of the Project Site, there are five- to eight-feet-high raised access roads that appear to have been created to access oil pump jacks.
The Geotechnical Investigation included a review of aerial photographs from 1952 to present. In 1952, the Project Site was used as part of the Kern Power Plant which included large steel storage tanks, oil pump jacks, storage buildings, drives and miscellaneous structures. The majority of the structures appear to have been demolished and removed between the years 2012 and 2014.
Around the same time as the demolition, the adjacent substation appears to have been developed and some grading was performed onsite.
Subsurface Conditions
As part of the preparation of the Geotechnical Investigation, Geotechnical Professional Inc. conducted a field survey to develop a subsurface profile of limited undocumented fills zero to three feet below existing grades. The undocumented fill soils consisted of predominately slightly moist silty sands with limited clayey sands. The natural soils consist of medium dense to dense silty sands with some thin layers of sandy silts and clayey sands to depths of about 20 to 25 feet where the soils became more dense and sandier. Laboratory testing indicates the upper medium dense natural soils exhibit high strength and low compressibility and have a low susceptibility to hydro collapse. The soils within the upper five feet were predominately dry to slightly moist with an average moisture content of 5.8 percent (about one to three percent dry of optimum). Additional information on the subsurface borings is included in Appendix E, Geotechnical Investigation, of this Draft EIR.
Groundwater and Caving
Groundwater was not encountered in Geotechnical Professional Inc.’s explorations to a depth of 100 feet below existing grades. Groundwater levels in the Project Site vicinity were evaluated based on groundwater well data provided by the California Department of Water Resources (CDWR) Water Data Library at four wells each within about 0.25-miles from the Project Site in each direction. The groundwater well data readily available from these wells indicates the existing and historical high groundwater level is greater than 50 feet below existing grades. Due to the method of drilling with a hollow-stem auger, the potential for caving was very difficult to determine.
Therefore, the Geotechnical Investigation anticipates that the upper dry, sandy soils have the potential to exhibit moderate caving in open cuts and excavations.
Faulting and Seismicity
The Project Site is in a seismically active area of California and is likely to be subjected to strong ground shaking due to earthquakes on nearby faults. During the life of the Project, the Project Site will likely be subject to strong ground motions due to earthquakes on nearby faults.
Riverview Marketplace Commercial Project
Environmental Impact Report 4.7 Geology and Soils
City of Bakersfield – SCH No. 2025101507 4.7-7
The CGS defines an active fault as a fault that has ruptured in the last 11,000 years.4 Based on published information, the closest active fault to the Project Site is the San Andreas fault, which is located about 34 miles from the Project Site. The nearest known fault trace and fault zone is the Kern Front Fault, a northeast trending fault, located approximately 6.13 miles northeast of the Project Site.5 The Project Site not located in an Alquist-Priolo Earthquake Fault Zone.
According to the CGS, the Project Site has not been evaluated by CGS for seismic and other geologic hazards. An area can be unevaluated for the following reasons: (1) the area is not developable for significant structures for human occupancy in the foreseeable future, (2) the area is not anticipated to experience levels of earthquake shaking high enough to generate hazards, or (3) CGS plans to delineate hazard zones in the future but has not prepared maps as of 2026.
Ground Rupture
Fault rupture is the surface displacement that occurs when movement on a fault deep within the earth breaks through to the surface. Fault rupture and displacement almost always follows preexisting faults, which are zones of weakness; however, not all earthquakes result in surface rupture (i.e., earthquakes that occur on blind thrusts do not result in surface fault rupture. Rupture may occur suddenly during an earthquake or slowly in the form of fault creep). In addition to damage caused by ground shaking from an earthquake, fault rupture is also damaging to buildings and other structures due to the differential displacement and deformation of the ground surface that occurs from the fault offset. This leads to damage or collapse of structures across this zone. Fault rupture displacements in large earthquakes can range from several feet to greater than 15 feet.
There are no known active faults crossing or projecting through the Project Site. As stated above, the Project Site is not located in an Alquist-Priolo Earthquake Fault Zone. Therefore, ground rupture at this site due to faulting is considered unlikely.
Ground Shaking
An earthquake is classified by the amount of energy released, which traditionally has been quantified using the Richter scale (ML). However, seismologists most commonly use the Moment Magnitude (MW) scale because it provides a more accurate measurement of the size of major and great earthquakes. For earthquakes of less than MW 7.0, the Moment and Richter Magnitude scales are nearly identical. For earthquake magnitudes greater than MW 7.0, readings on the Moment Magnitude scale are slightly greater than a corresponding Richter Magnitude.
The intensity of the seismic shaking, or strong ground motion, experienced at a particular location during an earthquake is dependent on the distance between that location and the epicenter of the earthquake, the magnitude of the earthquake, and the geologic conditions underlying and surrounding that location. Earthquakes occurring on faults closest to a particular site would most likely generate the largest ground motion. However, in the case of the Project Site, there are no known active or potentially active faults that cross the Project Site, including Alquist-Priolo Earthquake Fault Zones.
4 California Department of Conservation. Alquist-Priolo Earthquake Fault Zones webpage. Available at:
https://www.conservation.ca.gov/cgs/alquist-priolo#:~:text=An%20active%20fault%2C%20for%20the,in%20the%20last%2011%2C000%20years. Accessed March 2026. 5 California Department of Conservation California Geological Survey. 2026. Earthquake Zones of Required Investigation map.
Available at: https://maps.conservation.ca.gov/cgs/informationwarehouse/eqzapp/. Accessed March 2026.
Riverview Marketplace Commercial Project
Environmental Impact Report 4.7 Geology and Soils
City of Bakersfield – SCH No. 2025101507 4.7-8
Geologic Hazards
Liquefaction
Liquefaction is the sudden loss of soil shear strength and sudden increase in porewater pressure caused by shear strains, as could result from an earthquake. Liquefaction tends to occur in loose, saturated fine-grained sands, course silts, or clays with low plasticity. The liquefaction process typically occurs at depths less than 50 feet below the ground surface, although liquefaction can occur at deeper intervals, given the right conditions. The most susceptible zone occurs at depths shallower than 30 feet below the ground surface.
For liquefaction to occur, there must be specific soil type(s), soil saturation, and cyclic accelerations of sufficient magnitude to progressively increase the water pressures within the soil mass. Non-cohesive soil shear strength is developed by the point-to-point contact of the soil grains. As the water pressures increase in the void spaces surrounding the soil grains, soil particles become supported more by water than point-to-point contact. When water pressures increase sufficiently, soil grains lose the strength to hold to each other and the soils begin to liquefy. Liquefaction can lead to several types of ground failure, depending on slope conditions and the geological and hydrological settings. The four most common types of ground failure are:
(1) lateral spreads, (2) flow failures, (3) ground oscillation, and (4) loss of bearing strength.
According to the CGS Earthquake Zones of Required Investigation map indicates that the Project Site has not been evaluated for designation as a liquefaction zone.6 However, according to the Geotechnical Investigation (Appendix E), soil liquefaction is not likely to occur at the Project Site based on the depth of the groundwater in the area.
Seismically Induced Settlement
Settlement typically occurs as a form of horizontal displacement of relatively flat-lying alluvial material toward an open or “unconfined” face such as an open body of water, channel, or excavation. In soils, this movement is generally due to a weak plane and is often associated with liquefaction. As discussed above, the Geotechnical Investigation prepared for the Project determined that soil liquefaction is not likely to occur at the Project Site.
Seismic settlement that is not related to liquefaction occurs when strong earthquake shaking results in densification of loose to medium dense sandy soils above groundwater. Based on the Geotechnical Investigation’s findings, the upper, natural, loose sandy soils on the Project Site exhibited the potential for seismic settlement.
Landslides
Landslides are gravity-driven movements of earth materials that may include rock, soil, unconsolidated sediment, or combinations of such materials. The primary factors influencing the stability of a slope are the nature of the underlying soil or bedrock, the geometry of the slope (height and steepness), and rainfall. The presence of historic landslide deposits is a good indicator of future landslides. Landslides are commonly triggered by unusually high rainfall and the resulting soil saturation, by earthquakes, or a combination of these conditions. According to the CGS Earthquake Zones of Required Investigation map, the Project Site has not been evaluated for 6 California Department of Conservation California Geological Survey. 2026. Earthquake Zones of Required Investigation map.
Available at: https://maps.conservation.ca.gov/cgs/informationwarehouse/eqzapp/. Accessed March 2026.
Riverview Marketplace Commercial Project
Environmental Impact Report 4.7 Geology and Soils
City of Bakersfield – SCH No. 2025101507 4.7-9
designation of a landslide zone.
7 However, given that the Project Site is flat with no nearby slopes, bluffs, or steam banks, landslides are unlikely to occur on the Project Site.
Paleontological Resources
As previously discussed, a Paleontological Overview is included in Appendix E to the CRA prepared for the Project by BCR Consulting (BCR), dated February 14, 2025, and included in Appendix D, Cultural Resources Assessment, to this Draft EIR.
According to the Palaeontologic Overview, the geologic units underlying the Project Area (one-mile radius of the Project Site) are mapped primarily as alluvial fan deposits from the Holocene epoch. Holocene alluvial units are considered to be of high preservation value, but material found is unlikely to be fossil material due to the relatively modern associated dates of the deposits.
However, if development requires any substantial depth of disturbance, the likelihood of reaching Pleistocene alluvial sediments would increase. The Paleontological Overview concluded that while the presence of any fossil material is unlikely, if excavation activity disturbs deeper sediment dating to the earliest parts of the Holocene or Late Pleistocene periods, the material would be scientifically significant. Excavation activity associated with the development of the Project Area is unlikely to be paleontologically sensitive, but caution during development should be observed.
4.7.3 Impact Analysis
Methodology
Potential direct and indirect Project impacts were identified based on a review of the Geotechnical Investigation (Appendix E). The Geotechnical Investigation included a review of existing documents, field exploration, laboratory testing, and engineering analysis. The field exploration program for the Project consisted of 17 Cone Penetration Tests (CPTs) and 24 exploratory borings. The CPTs were advanced to depths ranging from 30 to 100 feet below existing site grades. Laboratory soil tests were performed on selected representative samples as an aid in soil classification and to evaluate the engineering properties of the soils. The geotechnical laboratory testing program included moisture content, dry density, grain size, shear strength (direct shear), consolidation, expansion potential, collapse, compaction, R-value, and soil corrosivity and is reported in Appendix C to the Geotechnical Investigation. Engineering evaluations were performed to provide earthwork criteria, foundation and slab design parameters, preliminary pavement sections and assessments of seismic hazards. The proposed development on the Project Site would be feasible from a geotechnical standpoint, provided that applicable regulations are met.
Thresholds of Significance
The City utilizes the California Environmental Quality Act (CEQA) Guidelines, Appendix G, and thresholds of significance8to analyze the environmental impacts of the Project. Per CEQA Guidelines, an impact is considered significant if the Project would:
• Directly or indirectly cause potential substantial adverse effects, including the risk fo loss, injury, or death involving:
7 California Department of Conservation California Geological Survey. 2026. Earthquake Zones of Required Investigation map.
Available at: https://maps.conservation.ca.gov/cgs/informationwarehouse/eqzapp/. Accessed March 2026. 8 Association of Environmental Professionals (AEP). 2025. CEQA Guidelines Appendices, Appendix G: Environmental Checklist Form. Available at: https://www.califaep.org/docs/CEQA_Handbook_2025combined.pdf. Accessed January 2026.
Riverview Marketplace Commercial Project
Environmental Impact Report 4.7 Geology and Soils
City of Bakersfield – SCH No. 2025101507 4.7-10
o Rupture of a known earthquake fault, as delineated on the most recent Alquist-Priolo Earthquake Fault Zoning Map issued by the State Geologist for the area or based on other substantial evidence of a known fault. Refer tp Division of Mines and Geology Special Publication 42.
o Strong seismic ground shaking.
o Seismic-related ground failure, including liquefaction. o Landslides.
• Result in substantial soil erosion or the loss of topsoil. • Be located on a geologic unit or soil that is unstable, or that would become unstable as a result of the project, and potentially result in on- or off-site landslide, lateral spreading, subsidence, liquefaction or collapse.
• Be located on expansive soil, as defined in Table 18-1-B of the Uniform Building Code (1994), creating substantial direct or indirect risks to life or property. • Have soils incapable of adequately supporting the use of septic tanks or alternative wastewater disposal systems where sewers are not available for the disposal of waste water.
• Directly or indirectly destroy a unique paleontological resource or site or unique geologic feature.
Project Impacts
Threshold GEO-1: Would the project directly or indirectly cause potential substantial adverse effects, including the risk of loss, injury, or death involving rupture of a known earthquake fault, as delineated on the most recent Alquist-Priolo Earthquake Fault Zoning Map, issued by the State Geologist for the area or based on other substantial evidence of a known fault or strong seismic ground shaking?
Impact Analysis
The closest fault to the site is the San Andreas fault, which is located about 34 miles from the Project Site. While the CGS did not evaluate the Project Site for earthquake hazard and no known faults or traces exist on the Project Site, the Project Site is located within Southern California, which is a seismically active region. Therefore, the potential for seismic ground shaking exists at the Project Site.
During the life of the Project, the Project Site will likely be subject to strong ground motions due to earthquakes on nearby faults. The Geotechnical Investigation included calculations that determined the Project Site’s peak ground acceleration (PGAM) to be 0.48g, which ultimately provides seismic design parameters specific for the Project Site based on the 2025 CBC.
The Project would be required to include seismic design in accordance with the 2025 CBC criteria.
The CPT testing conducted at the Project Site indicates that the Project would be considered Site Class D, which represents “stiff soil,” a common default classification requiring enhanced structural design for earthquake resistance. Projects in this category must follow strict lateral-force-resisting systems per ASCE 7-22 to ensure occupant safety. Design and construction of the Project would be required to adhere to the seismic safety requirements contained in the CBC, Riverview Marketplace Commercial Project
Environmental Impact Report 4.7 Geology and Soils
City of Bakersfield – SCH No. 2025101507 4.7-11
which have been adopted by the City, as well as the applicable recommendations provided in the Geotechnical Investigation required by the City to minimize seismic-related hazards.
Moreover, the Project would not exacerbate existing environmental conditions related to seismic ground shaking at the Project Site because the Project would not involve mining operations, excavation of large areas, or the extraction or injection of oil or groundwater, which could create unstable seismic conditions that would exacerbate ground shaking.
Mandatory compliance with applicable regulatory requirements and incorporation of the recommendations included in the Geotechnical Investigation would reduce the potential for significant damage to structures resulting from strong seismic ground shaking and the exposure of people or structures to potential substantial adverse effects, including the risk of loss, injury or death, to the maximum extent practical. Therefore, based on the above, development of the Project would not directly or indirectly cause substantial adverse effects, including risk of loss, injury, or death involving strong seismic ground shaking hazards. Impacts would be less than significant.
Mitigation Measures
None required.
Level of Significance After Mitigation
Less than significant with no mitigation required.
Threshold GEO-2: Would the project directly or indirectly cause potential substantial adverse effects, including the risk of loss, injury, or death involving seismic-related ground failure, including liquefaction? Impact Analysis
According to the Geotechnical Investigation, the Project Site is not located within a zone identified as having a potential for liquefaction by the CGS, as the quadrangle has not yet been assessed.
Therefore, based on the depth of groundwater in the area, the Geotechnical Investigation (Appendix E) determined that soil liquefaction is not likely to occur at the Project Site.
Seismic settlement that is not related to liquefaction occurs when strong earthquake shaking results in densification of loose to medium dense sandy soils above groundwater. The upper, natural, loose sandy soils encountered during the field survey of the Geotechnical Investigation exhibited the potential for seismic settlement. The Geotechnical Investigation estimated that the magnitude of induced seismic ground surface settlement is on the order of a half inch with differential settlement across 60 feet on the order of a quarter inch. As such, the Geotechnical Investigation recommends that the Project includes remedial pad grading, which with implementation, would reduce seismic settlement to less than a quarter inch. Implementation of the remedial pad grading as recommended in the Geotechnical Investigation is required by the City.
Additionally, the Project would comply with seismic design requirements included in the CBC, which is adopted by the City, in addition to the Geotechnical Investigation recommendations related to earthwork, foundations, building floor slabs, corrosions, retaining wall structures, drainage, stormwater infiltration, and external concrete, masonry, and paving. As such, potential impacts associated with exposure of people or structures to potential substantial adverse effects, including the risk of loss, injury, or death involving seismic-related ground failure including liquefaction would be less than significant.
Riverview Marketplace Commercial Project
Environmental Impact Report 4.7 Geology and Soils
City of Bakersfield – SCH No. 2025101507 4.7-12
Mitigation Measures
None required.
Level of Significance After Mitigation
Less than significant with no mitigation required.
Threshold GEO-3: Would the project directly or indirectly cause potential substantial adverse effects, including the risk of loss, injury, or death involving landslides?
Impact Analysis
The Project Site has not been evaluated by the CGS for susceptibility to landslides. However, the Project Site is located on relatively flat ground and is not adjacent to any areas with steep slopes that could produce a landslide in the event that ground shaking occurred at the Project Site. Due to the relatively level topography at the site, the project site and surrounding area are not susceptible to landslides. Therefore, no impact would occur.
Mitigation Measures
None required.
Level of Significance After Mitigation
No impact with no mitigation required.
Threshold GEO-4: Would the project result in substantial soil erosion or the loss of topsoil?
Impact Analysis
Soil erosion occurs when surface materials are worn away from the earth’s surface due to ground disturbance and/or factors such as wind and precipitation. The potential for soil erosion is determined by characteristics including texture and content, surface roughness, vegetation cover, and slope grade and length. Wind erosion typically occurs when fine-grained non-cohesive soils are exposed to high-velocity winds, while water erosion tends to occur when loose soils on moderate to steep slopes are exposed to high-intensity storm events.
Development of the proposed would require removal and replacement soil throughout the Project Site. This would lead to limited exposure of near surface soils. Soils on the Project Site from zero to three feet below the existing grade consists of undocumented fill, comprised of predominately slightly moist silty sands with limited clayey sands, according to the Geotechnical Investigation.
Current moisture contents of the upper soils are generally below the optimum moisture content.
There is potential for erosion of these materials, depending on drainage and wind patterns.
Therefore, significant moisture conditioning (wetting) will be required as part of required adherence to the recommendations in the Geotechnical Investigation.
Development of the proposed Project would require compliance with the requirements of the National Pollutant Discharge Elimination System (NPDES) permit. The NPDES permitting process applies to projects involving disturbance of one acre or more. These projects are required to prepare and implement a Stormwater Pollution Prevention Plan (SWPPP) that specifies how water quality would be protected during construction activities. This would include implementing best management practices (BMPs) that would reduce the potential for soil erosion. Construction Riverview Marketplace Commercial Project
Environmental Impact Report 4.7 Geology and Soils
City of Bakersfield – SCH No. 2025101507 4.7-13
BMPs would include, but are not limited to, stabilization of construction entrances and sediment filters on existing inlets. The SWPPP and BMPs are discussed further in Section 4.10, Hydrology and Water Quality.
Upon completion of construction, the Project Site would be fully developed with large areas of impermeable surface and minimal areas of landscaping. The extensive site coverage would reduce the potential for erosion to a minimum. Consequently, operational impacts associated with soil erosion and loss of topsoil due to the Project would be less than significant.
Mitigation Measures
None required.
Level of Significance After Mitigation
Less than significant with no mitigation required.
Threshold GEO-5: Would the project be located on a geologic unit or soil that is unstable, or that would become unstable as a result of the project, and potentially result in on- or off-site landslide, lateral spreading, subsidence, liquefaction or collapse?
Impact Analysis
The Geotechnical Investigation determined that soil liquefaction is not likely to occur at the Project Site and, due to the surface conditions of the Project Site, landslides are not expected to occur.
Regardless, the Project would comply with seismic design requirements included in the CBC, as well as the recommendations of the Geotechnical Investigation. Compliance with the requirements of the CBC and other applicable regulations and standards would reduce potential impacts associated with exposure of people or structures to potential substantial adverse effects, including the risk of loss, injury, or death involving seismic-related ground failure including liquefaction, to less than significant.
Mitigation Measures
None required.
Level of Significance After Mitigation
Less than significant with no mitigation required.
Threshold GEO-6: Would the project be located on expansive soil, as defined in Table 18-1-B of the Uniform Building Code (1994), creating substantial risks to life or property?
Impact Analysis
Soils that expand and contract in volume (“shrink-swell” pattern) are considered to be expansive and may cause damage to aboveground infrastructure as a result of density changes that shift overlying materials. Fine-grain clay sediments are most likely to exhibit shrink-swell patterns in response to changing moisture levels. According to the Geotechnical Investigation, granular, non-expansive soils are readily available on the Project Site. As such, there is not a geotechnical requirement for slab thickness or reinforcing based on the non-expansive characteristics of the on-site soils. Additionally, expansion index tests were performed on select bulk samples. The test was performed in accordance with ASTM D4829, to assess the expansion potential of on-site Riverview Marketplace Commercial Project
Environmental Impact Report 4.7 Geology and Soils
City of Bakersfield – SCH No. 2025101507 4.7-14
soils. Both samples tested were well below the threshold for the expansion index, indicating that there was no expansive soil found.
However, undocumented fills were encountered to depths of predominately three feet below existing grade at the Project Site with localized deeper fills on the order of 5 to 7 feet. These fill soils are not considered to be suitable for direct support of foundations or floor slabs without remedial earthwork. For the proposed improvements included in the Project, the Geotechnical Investigation recommends the removal and recompaction of the fill and a portion of the upper low-density natural soils to provide uniform support for the planned foundations and floor slab. Any imported soils would be predominantly granular and non-expansive. Accordingly, impacts from expansive soils are less than significant.
Mitigation Measures
None required.
Level of Significance After Mitigation
Less than significant with no mitigation required.
Threshold GEO-7: Would the project have soils incapable of adequately supporting the use of septic tanks or alternative wastewater disposal systems where sewers are not available for the disposal of waste water? Impact Analysis
No septic tanks or other alternative wastewater disposal system are proposed. Project development would include construction of all necessary on- and off-site infrastructure improvements to adequately serve the Project’s water, wastewater, and drainage needs. Water and wastewater services would be provided by the City. All proposed infrastructure and improvements would require City approval and where necessary, approval by the utility/service provider. Water and wastewater systems are further discussed in Section 4.19, Utilities and Service Systems, of this Draft EIR. No impact would occur.
Mitigation Measures
None required.
Level of Significance After Mitigation
No impact and no mitigation required.
Threshold GEO-8: Would the project directly or indirectly destroy a unique paleontological resource or site or unique geologic feature? Impact Analysis
The proposed Project is situated in a highly disturbed environment and there are no unique geologic features located on or around the Project Site. According to the Palaeontologic Overview, the geologic units underlying the Project Area (one mile radius around the Project Site) are mapped primarily as alluvial fan deposits from the Holocene epoch. Holocene alluvial units are considered to be of high preservation value, but material found is unlikely to be fossil material due to the relatively modern associated dates of the deposits. While the presence of any fossil material is unlikely, if excavation activity disturbs deeper sediment dating to the earliest parts of the Holocene or Late Pleistocene periods, the material would be scientifically significant.
Riverview Marketplace Commercial Project
Environmental Impact Report 4.7 Geology and Soils
City of Bakersfield – SCH No. 2025101507 4.7-15
Excavation activity associated with the development of the project area is unlikely to be paleontologically sensitive, but caution during development should be observed. However, because the Project construction would require earthwork and removal of soil, there is potential for the discovery of unknown paleontological resources. Therefore, the Project would implement Mitigation Measure (MM) GEO-1, Paleontological Discovery and Monitoring, which outlines the process for discovery of paleontological resources. With implementation of MM GEO-1, impacts would be less than significant.
Mitigation Measures
MM GEO-1 Paleontological Discovery and Monitoring. In the event paleontological resources, including fossil discoveries, are encountered during construction of the Project, work shall halt within a 50-foot radius of the find and the City shall be immediately informed of the discovery. A qualified paleontologist shall be retained by the Applicant to evaluate the find before restarting work in the area. A qualified paleontologist is a paleontologist who meets the Society of Vertebrate Paleontology (SVP) standards for Qualified Professional Paleontologist, which is defined as an individual preferably with an M.S. or Ph.D. in paleontology or geology, who is experienced with paleontological procedures and techniques, who is knowledgeable in the geology of California (preferably Southern California), and who has worked as a paleontological mitigation Project supervisor for a least one year. The City shall require that all paleontological resources identified on the Project site be assessed and treated in a manner determined by the qualified paleontologist. The qualified paleontologist shall be empowered to halt or divert ground disturbing activities.
If the discoveries are determined to be significant, full-time paleontological monitoring will be recommended for the remainder of ground disturbance for the Project. Paleontological monitoring shall entail the visual inspection of excavated or graded areas and trench sidewalls. In the event that any additional paleontological resources are discovered, the monitor shall have the authority to temporarily divert the construction equipment around the find until it is assessed for scientific significance and collected, if warranted.
Monitoring efforts can be reduced or eliminated at the discretion of the project paleontologist.
Upon completion of fieldwork, all significant fossils collected shall be prepared in a properly equipped paleontology laboratory to a point ready for curation. Following laboratory work, all fossil specimens shall be identified to the most specific taxonomic level possible, cataloged, analyzed, and first offered to the Buena Vista Museum then offered to the Natural History Museum of Los Angeles County for permanent curation and storage. At the conclusion of laboratory work and museum curation, a final Paleontological Monitoring Report (PMR) shall be prepared describing the results of the paleontological mitigation monitoring efforts associated with the Project. The report shall include a summary of the field and laboratory methods, an overview of the project area geology and paleontology, a list of taxa recovered, an analysis of fossils recovered and their scientific significance, and recommendations. A copy of the report shall also be submitted to the Buena Vista Museum in Bakersfield.
Riverview Marketplace Commercial Project
Environmental Impact Report 4.7 Geology and Soils
City of Bakersfield – SCH No. 2025101507 4.7-16
Level of Significance After Mitigation
Less than significant with mitigation incorporated.
Cumulative Impacts
Impact Analysis
Section 3.3, Cumulative Development, identifies projects in the City that are planned, under construction, or have been recently completed. A summary of these projects is provided in Table 3-1, Cumulative Projects List. Potential cumulative impacts would occur if the Project in combination with the identified cumulative projects would result in significant effects to geology and soils. For purposes of this analysis, the geographic scope would be the City.
Some of the related projects identified in Table 3-1 would require excavation at depths that could potentially cause adverse effects including risk of loss, injury, or death based on strong seismic ground shaking, liquefaction, landslides and that could destroy a unique paleontological resource.
However, related projects that involve substantial excavation with the potential to expose people or structures to adverse effects of liquefaction and destroy paleontological resources are expected to adhere to the CBC, conduct a project-specific geotechnical investigation, and implement recommendations from that investigation or mitigation measures to mitigate impacts. With mandatory compliance with existing regulations and implementation of such mitigation measures, cumulative impacts from related projects are considered to be less than significant.
The Project is required to comply with the MM GEO-1, Paleontological Discovery and Monitoring, thus ensuring impacts to any paleontological resources are less than significant. Therefore, as impacts related to paleontological resources from related projects would be less than significant with implementation of mitigation measures, and as the Project would mitigate its potential impacts to paleontological resources to a less than significant level, cumulative impacts would be less than significant.
Mitigation Measures
Refer to MM GEO-1.
Level of Significance After Mitigation
Cumulative impacts related to geology and soils would be less than significant with mitigation incorporated.
City of Bakersfield – SCH No. 2025101507 4.8-1
4.8 Greenhouse Gas Emissions
This section of the Draft EIR analyzes potential greenhouse gas emissions impacts associated with the construction and operation of the proposed Project. The information in this section is summarized from the detailed greenhouse gas emissions analysis, Appendix B, Air Quality, Greenhouse Gas Emissions, and Energy Technical Study.
4.8.1 Regulatory Setting
Federal
The U.S. Environmental Protection Agency (USEPA) announced on December 7, 2009, that GHG emissions threaten the public health and welfare of the American people and that GHG emissions from on-road vehicles contribute to that threat. The USEPA’s final findings respond to the 2007 U.S. Supreme Court decision that GHG emissions fit within the Clean Air Act definition of air pollutants. The findings do not impose any emission reduction requirements, but allowed the USEPA to finalize the GHG standards proposed in 2009 for new light-duty vehicles as part of the joint rulemaking with the Department of Transportation.
To regulate GHGs from passenger vehicles, the USEPA was required to issue an endangerment finding (USEPA 2025a). The finding identified emissions of six key GHGs—CO2, CH4, N2O, hydrofluorocarbons, perfluorocarbons, and SF6—that have been the subject of scrutiny and intense analysis for decades by scientists in the United States and around the world. The first three are applicable to the Project’s GHG emissions inventory because they constitute the majority of GHG emissions and should be evaluated as part of a project’s GHG emissions inventory.
On January 20, 2025, the President of the United States signed an executive order, Unleashing American Energy, which directed the USEPA to eliminate the social cost of carbon calculation from any federal permitting or regulatory decision and submit recommendations on the legality and continued applicability of the 2009 endangerment finding, among other directives. On July 29, 2025, the USEPA released its proposal to rescind the 2009 endangerment finding and repeal all GHG emission standards for light-duty, medium-duty, and heavy-duty vehicles and engines pursuant to CAA Section 202(a). The proposed rule would remove GHG-related provisions from 40 CFR Part 600 without affecting provisions related to Corporate Average Fuel Economy (CAFE) standards and fuel economy labeling. On February 12, 2026, USEPA finalized its rescission of the 2009 Greenhouse Gas Endangerment Finding.
U.S. Mandatory Report Rule for GHGs (2009)
In response to the endangerment finding, the EPA issued the Mandatory Reporting of GHG Rule that requires substantial emitters of GHG emissions (large stationary sources, etc.) to report GHG emissions data. Facilities that emit 25,000 MTCO2e or more per year are required to submit an annual report.
Corporate Average Fuel Economy Standards
The Energy Policy and Conservation Act of 1975 was established in response to the 1973 oil crisis. The act created the Strategic Petroleum Reserve, established vehicle fuel economy standards, and prohibited the export of U.S. crude oil (with a few limited exceptions). It also created Corporate Average Fuel Economy (CAFE) standards for passenger cars starting in model Riverview Marketplace Commercial Project
Environmental Impact Report 4.8 Greenhouse Gas Emissions City of Bakersfield – SCH No. 2025101507 4.8-2
year 1978. The CAFE Standards are updated periodically to account for changes in vehicle technologies, driver behavior, and/or driving conditions.
The federal government issued new CAFE standards in 2012 for model years 2017 to 2025, which required a fleet average of 54.5 miles per gallon (mpg) in 2025. On March 30, 2020, the EPA finalized updated CAFE and greenhouse gas (GHG) emissions standards for passenger cars and light trucks and established new standards covering model years 2021 through 2026, known as the Safer Affordable Fuel Efficient (SAFE) Vehicles Final Rule for Model Years 2021 to 2026. On December 21, 2021, under direction of Executive Order 13990 issued by President Biden, the National Highway Traffic Safety Administration (NHTSA) repealed SAFE Vehicles Rule Part One, which had preempted State and local laws related to fuel economy standards. In addition, on March 31, 2022, the NHTSA finalized new fuel standards that will increase fuel efficiency 8 percent annually for model years 2024 to 2025 and 10 percent for model year 2026. Overall, the new CAFE standards require a fleet average of 49 mpg for passenger vehicles and light trucks for model year 2026, which will be a 10 mpg increase compared to model year 2021.
On June 7, 2024, the NHTSA announced final CAFE standards for passenger cars and light trucks built in model years 2027 to 2031 and final fuel efficiency standards for heavy-duty pickup trucks and vans built in model years 2030 to 2035. The final rules establish standards that would require an industry fleetwide average of approximately 50.4 mpg for passenger cars and light trucks in model year 2031, by increasing fuel economy by 2 percent year over year for passenger cars (model years 2027–2031) and for light trucks (model years 2029–2031). For heavy-duty pickup trucks and vans, the final rule would increase fuel efficiency at a rate of 10 percent per year (model years 2030–2032) and 8 percent per year (model years 2033–2035) (NHTSA 2024). However, the NHTSA released new proposed standards on December 3, 2025, under the SAFE Vehicle Rule III. The new proposed CAFE standards set a 0.5 percent increase in fuel efficiency per year for model year 2023 through 2026 passenger vehicles and light trucks. In addition, it also sets a
0.35 percent and 0.70 percent increase for model year 2027 passenger vehicles and light trucks, respectively, a 0.25 percent increase for model year 2028-2031 light duty vehicles, and a fuel economy standard of 34.5 MPG for model year 2031 light duty vehicles.
Furthermore, on June 11, 2025, the NHTSA published the final rule, “Resetting the Corporate Average Fuel Economy Program.” This interpretive rule issued by the NHTSA does not immediately change or reverse current fuel economy standards; however, the rule clarifies the NHTSA’s interpretation of its obligations for CAFE standards stemming from the Energy Policy and Conservation Act of 1975 and the Energy Independence and Security Act of 2007. The rule asserts that some regulations, such as those established under previous presidential administrations, improperly considered electric vehicles (EVs) when identifying the “maximum feasibility” average fuel economy level upon which CAFE standards are developed, thereby establishing a legal foundation for future rollbacks of CAFE standards.
Multi-Pollutant Emissions Standards for Model Years 2027 and Later Light-Duty and Medium-Duty Vehicles
In 2024, the USEPA issued a final rule, “Multi-Pollutant Emissions Standards for Model Years 2027 and Later Light-Duty and Medium-Duty Vehicles,” that sets new, more protective standards to reduce harmful air pollutant emissions from light-duty and medium-duty vehicles starting with MY 2027.
Riverview Marketplace Commercial Project
Environmental Impact Report 4.8 Greenhouse Gas Emissions City of Bakersfield – SCH No. 2025101507 4.8-3
State
Current State of California guidance and goals for reductions in GHG emissions are generally embodied in Executive Orders (EO) S-03-05 and B-30-15, Assembly Bill 32, Senate Bill 32, and Senate Bill 375.
Executive Order S-03-05
EO S-03-05, signed June 1, 2005, set the following GHG reduction targets for the state:
• 2000 levels by 2010
• 1990 levels by 2020
• 80 percent below 1990 levels by 2050
Assembly Bill 32, the Global Warming Solutions Act (2006) Commonly known as its legislative bill number (AB 32), this act was signed August 31, 2006, to reduce California’s contribution of GHG emissions. AB 32 follows the 2020 tier of emissions-reduction targets established in EO S-03-05. The California Air Resources Board (CARB) prepared the 2008 Scoping Plan to outline a plan to achieve the GHG emissions reduction targets of AB 32.
Executive Order B-30-15
EO B-30-15, signed April 29, 2015, set a goal of reducing GHG emissions within the state to 40 percent of 1990 levels by year 2030. EO B-30-15 also directed CARB to update the Scoping Plan to quantify the 2030 GHG reduction goal for the state and required state agencies to implement measures to meet the interim 2030 goal, as well as the long-term goal for 2050 in EO S-03-05. It required the California Natural Resources Agency to conduct triennial updates of the California adaption strategy, “Safeguarding California,” to ensure climate change is accounted for in state planning and investment decisions.
Senate Bill 32 and Assembly Bill 197
In September 2016, Governor Brown signed Senate Bill 32 and Assembly Bill 197, making the Executive Order goal for year 2030 into a statewide, mandated legislative target. AB 197 established a joint legislative committee on climate change policies and requires CARB to prioritize direct emissions reductions rather than the market-based cap-and-trade program for large stationary, mobile, and other sources.
Executive Order B-55-18
EO B-55-18, signed September 10, 2018, sets a goal “to achieve carbon neutrality as soon as possible, and no later than 2045, and achieve and maintain net negative emissions thereafter.” EO B-55-18 directs CARB to work with relevant state agencies to ensure future Scoping Plans identify and recommend measures to achieve the carbon neutrality goal. The goal of carbon neutrality by 2045 is in addition to other statewide goals, meaning not only should emissions be reduced to 80 percent below 1990 levels by 2050, but that, by no later than 2045, the remaining emissions should be offset by equivalent net removals of CO2e from the atmosphere, including through sequestration in forests, soils, and other natural landscapes.
Riverview Marketplace Commercial Project
Environmental Impact Report 4.8 Greenhouse Gas Emissions City of Bakersfield – SCH No. 2025101507 4.8-4
Assembly Bill 1279
On August 31, 2022, the California Legislature passed AB 1279, which requires California to achieve net-zero GHG emissions no later than 2045 and to achieve and maintain negative GHG emissions thereafter. Additionally, AB 1279 also establishes a GHG emissions reduction goal of 85 percent below 1990 levels by 2045. CARB will be required to update the Scoping Plan to identify and recommend measures to achieve the net-zero and GHG emissions-reduction goals. 2022 Scoping Plan Update
CARB adopted the 2022 Scoping Plan for Achieving Carbon Neutrality (2022 Scoping Plan) on December 15, 2022, which lays out a path to achieve carbon neutrality by 2045 or earlier and to reduce the state’s anthropogenic GHG emissions (CARB 2022). The Scoping Plan was updated to address the carbon neutrality goals of EO B-55-18 (discussed below) and the ambitious GHG reduction target as directed by AB 1279. Previous Scoping Plans focused on specific GHG reduction targets for our industrial, energy, and transportation sectors—to meet 1990 levels by 2020, and then the more aggressive 40 percent below that for the 2030 target. The 2022 Scoping Plan expands upon earlier Scoping Plans with a target of reducing anthropogenic emissions to 85 percent below 1990 levels by 2045. Carbon neutrality takes it one step further by expanding actions to capture and store carbon, including through natural and working lands and mechanical technologies, while drastically reducing anthropogenic sources of carbon pollution at the same time.
The path forward was informed by the recent Sixth Assessment Report (AR6) of the Intergovernmental Panel on Climate Change (IPCC), and the measures would achieve 85 percent below 1990 levels by 2045 in accordance with AB 1279.
For residential and mixed-use development projects, CARB recommends this first approach to demonstrate that these land use development projects are aligned with state climate goals based on the attributes of land use development that reduce operational GHG emissions while simultaneously advancing fair housing. Attributes that accommodate growth in a manner consistent with the GHG and equity goals of SB 32 have all the following attributes:
▪ Transportation Electrification
• Provide EV charging infrastructure that, at a minimum, meets the most ambitious voluntary standards in the California Green Building Standards Code at the time of project approval. ▪ VMT Reduction
• Is located on infill sites that are surrounded by existing urban uses and reuses or redevelops previously undeveloped or underutilized land that is presently served by existing utilities and essential public services (e.g., transit, streets, water, sewer). • Does not result in the loss or conversion of the State’s natural and working lands. • Consists of transit-supportive densities (minimum of 20 residential dwelling units/acre) or is in proximity to existing transit stops (within a half mile) or satisfies more detailed and stringent criteria specified in the region’s Sustainable Communities Strategy (SCS). • Reduces parking requirements by:
▪ Eliminating parking requirements or including maximum allowable parking ratios (i.e., the ratio of parking spaces to residential units or square feet); or ▪ Providing residential parking supply at a ratio of <1 parking space per dwelling unit; or Riverview Marketplace Commercial Project
Environmental Impact Report 4.8 Greenhouse Gas Emissions City of Bakersfield – SCH No. 2025101507 4.8-5
▪ For multifamily residential development, requiring parking costs to be unbundled from costs to rent or own a residential unit.
• At least 20 percent of the units are affordable to lower-income residents; • Result in no net loss of existing affordable units.
▪ Building Decarbonization
• Use all electric appliances without any natural gas connections and does not use propane or other fossil fuels for space heating, water heating, or indoor cooking (CARB 2022).
The second approach to project-level alignment with state climate goals is net zero GHG emissions, especially for new residential projects. The third approach to demonstrating project-level alignment with state climate goals is to align with GHG thresholds of significance, which many local air quality management and air pollution control districts have developed or adopted.
Senate Bill 375
In 2008, SB 375, the Sustainable Communities and Climate Protection Act, was adopted to connect the GHG emissions reductions targets established in the 2008 Scoping Plan for the transportation sector to local land use decisions that affect travel behavior. Its intent is to reduce GHG emissions from light-duty trucks and automobiles (excludes emissions associated with goods movement) by aligning regional long-range transportation plans, investments, and housing allocations to local land use planning to reduce VMT and vehicle trips. Specifically, SB 375 required CARB to establish GHG emissions reduction targets for each of the 18 metropolitan planning organizations (MPO). The Kern Council of Governments (Kern COG) is the MPO for the County of Kern (County) and its 11 incorporated cities, including Bakersfield.
Pursuant to the recommendations of the Regional Transportation Advisory Committee, CARB adopted per capita reduction targets for each of the MPOs rather than a total magnitude reduction target. CARB is required to update the targets for the MPOs every eight years. In June 2017, CARB released updated targets and technical methodology, and then released another update in February 2018, which became effective in October 2018. CARB staff began the target update process in 2024 with a public workshop and plans to conclude it in 2026 with Board approval of the new targets.
The updated targets consider the need to further reduce VMT, as identified in the 2017 Scoping Plan Update, while balancing the need for additional and more flexible revenue sources to incentivize positive planning and action toward sustainable communities. The updated SB 375 targets are in units of percent per capita reduction in GHG emissions from automobiles and light trucks compared to 2005. This excludes reductions anticipated from implementation of State technology and fuels strategies and any potential future State strategies such as statewide road user pricing. The updated targets call for greater per-capita GHG emission reductions from SB 375 than were currently in place, which for 2035 translates into updated targets that either match or exceed the emission reduction levels in the MPOs’ currently adopted SCSs. CARB’s updated targets result in an additional reduction of over 8 MMTCO2e in 2035 compared to the prior targets.
Kern COG’s Regional Transportation Plan/Sustainable Communities Strategy The Kern COG 2022 Regional Transportation Plan/Sustainable Communities Strategy (2022 RTP/SCS), which covers a 24-year period, is the latest adopted RTP/SCS and integrates transportation, land use, and housing in the planning process. The 2022 RTP/SCS provides the foundation for transportation decisions by local, regional, and state officials; documents the Riverview Marketplace Commercial Project
Environmental Impact Report 4.8 Greenhouse Gas Emissions City of Bakersfield – SCH No. 2025101507 4.8-6
region’s mobility needs and issues; identifies and attempts to resolve regional issues and provide policy and direction for local transportation plans; documents the region’s goals, policies, and objectives for meeting current and future transportation mobility needs; defines an action plan to address transportation issues and needs, consistent with regional and state policies; identifies transportation improvements in sufficient detail to aid in the development of the state transportation improvement program and to be useful in making decisions related to the development and growth of the region; identifies the agencies responsible for implementing action plans; and documents the region’s financial resources needed to meet mobility needs. Overall, the 2022 RTP/SCS identifies that the Kern COG region will meet its per capita targets for both 2020 and 2035 at 9 percent and 15 percent, respectively. The Kern COG is currently preparing the 2026 RTP/SCS, which would replace the 2022 RTP/SCS once adopted.
Transportation Sector–Specific Regulations
Assembly Bill 1493
California vehicle GHG emission standards were enacted under AB 1493 (Pavley I). Pavley I is a clean-car standard that reduces GHG emissions from new passenger vehicles (light-duty auto to medium-duty vehicles) from 2009 through 2016 and is anticipated to reduce GHG emissions from new passenger vehicles by 30 percent in 2016. California implements the Pavley I standards through a waiver granted to California by the EPA. In January 2012, CARB approved the Advanced Clean Cars program (formerly known as Pavley II) for model years 2017 through 2025.
The program combines the control of smog, soot, and global warming gases with requirements for greater numbers of zero emission (ZE) vehicles into a single package of standards. Under California’s Advanced Clean Car program, by 2025 new automobiles will emit 34 percent less global warming gases and 75 percent less smog-forming emissions.
Executive Order S-01-07
On January 18, 2007, the state set a new low-carbon fuel standard (LCFS) for transportation fuels sold in the state. EO S-01-07 sets a declining standard for GHG emissions measured in CO2e gram per unit of fuel energy sold in California. The LCFS required a reduction of 2.5 percent in the carbon intensity of California’s transportation fuels by 2015 and a reduction of at least 10 percent by 2020. In 2018, the LCFS was amended to include a year 2030 reduction goal of at least 20 percent in the carbon intensity of transportation fuels. The standard applies to refiners, blenders, producers, and importers of transportation fuels and would use market-based mechanisms to allow these providers to choose how they reduce emissions during the “fuel cycle” using the most economically feasible methods.
Executive Order B-16-2012
On March 23, 2012, the State announced that CARB, the California Energy Commission (CEC), the Public Utilities Commission, and other relevant agencies worked with the Plug-in Electric Vehicle Collaborative and the California Fuel Cell Partnership to establish benchmarks to accommodate ZE vehicles in major metropolitan areas, including infrastructure to support them (e.g., electric vehicle charging stations). The EO directed an increase in the number of ZE vehicles in California’s state fleet through the normal course of fleet replacement so that at least 10 percent of fleet purchases of light-duty vehicles would be ZE by 2015 and at least 25 percent by 2020.
The EO also established a target for the transportation sector of reducing GHG emissions to 80 percent below 1990 levels.
Riverview Marketplace Commercial Project
Environmental Impact Report 4.8 Greenhouse Gas Emissions City of Bakersfield – SCH No. 2025101507 4.8-7
Executive Order N-79-20
On September 23, 2020, Governor Newsom signed EO N-79-20, which sets a course to end sales of internal combustion passenger vehicles. EO N-79-20 set a statewide goal that 100 percent of in-state sales of new passenger cars and trucks will be ZE by 2035. Additionally, the fleet goals for trucks are that 100 percent of drayage trucks be ZE by 2035 and 100 percent of medium- and heavy-duty vehicles in the state be ZE by 2045, where feasible. EO N-79-20 also identifies a goal for the state to transition to 100 percent ZE off-road vehicles and equipment by 2035, where feasible. Advanced Clean Cars II (ACC II) approved by CARB on August 25, 2022, codified the zero-emission vehicle transition goal established under EO-N-79-20 and set low-emission and zero-emission vehicle standards for model year 2026 through 2035 vehicles. However, on May 22, 2025, the U.S. Senate voted to revoke the waiver granted by the Biden administration for the ACC II program through congressional resolution. On June 12, 2025, President Trump signed the resolution, which formally nullified ACC II. Currently, implementation of ACC II is unknown.
Renewables Portfolio: Carbon Neutrality Regulations
Senate Bills 1078, 107, and X1-2 and Executive Order S-14-08 A major component of California’s Renewable Energy Program is the renewables portfolio standard (RPS) established under Senate Bills 1078 (Sher) and 107 (Simitian). Under the RPS, certain retail sellers of electricity were required to increase the amount of renewable energy each year by at least 1 percent and to reach at least 20 percent by December 30, 2010. EO S-14-08, signed in November 2008, expanded the State’s renewable energy standard to 33 percent renewable power by 2020. This standard was adopted by the legislature in 2011 (SB X1-2).
Renewable sources of electricity include wind, small hydropower, solar, geothermal, biomass, and biogas. The increase in renewable sources for electricity production will decrease indirect GHG emissions from development projects because electricity production from renewable sources is generally considered carbon neutral.
Senate Bill 350
Senate Bill 350 (De Leon), was signed into law in September 2015. SB 350 establishes tiered increases to the RPS of 40 percent by 2024, 45 percent by 2027, and 50 percent by 2030. SB 350 also set a new goal to double the energy efficiency savings in electricity and natural gas through energy efficiency and conservation measures.
Senate Bill 100
On September 10, 2018, Governor Brown signed SB 100, which replaced the SB 350 requirement of 45 percent renewable energy by 2027 with the requirement of 50 percent by 2026 and raises California’s RPS requirements for 2030 from 50 percent to 60 percent. SB 100 also sets RPS requirements for publicly owned utilities to consist of 44 percent renewable energy by 2024, 52 percent by 2027, and 60 percent by 2030. The bill establishes an overall state policy that eligible renewable energy resources and zero-carbon resources supply 100 percent of all retail sales of electricity to California end-use customers and 100 percent of electricity procured to serve all state agencies by December 31, 2045. Under the bill, the state cannot increase carbon emissions elsewhere in the western grid or allow resource shuffling to achieve the 100 percent carbon-free electricity target.
Riverview Marketplace Commercial Project
Environmental Impact Report 4.8 Greenhouse Gas Emissions City of Bakersfield – SCH No. 2025101507 4.8-8
Senate Bill 1020
SB 1020 was signed into law on September 16, 2022. It requires renewable energy and zero-carbon resources to supply 90 percent of all retail electricity sales by 2035 and 95 percent by 2040. Additionally, SB 1020 requires all state agencies to procure 100 percent of electricity from renewable energy and zero-carbon resources by 2035.
Energy Efficiency Regulations
California Building Code: Building Energy Efficiency Standards Energy conservation standards for new residential and nonresidential buildings were adopted by the California Energy Resources Conservation and Development Commission (now the CEC) in June 1977 (24 California Code of Regulations [CCR] Part 6). Part 6 requires the design of building shells and building components to conserve energy. The standards are updated periodically to allow for consideration and possible incorporation of new energy-efficiency technologies and methods.
The 2022 Building Energy Efficiency Standards were adopted on August 11, 2021, and went into effect on January 1, 2023. The 2022 standards encourage efficient electric heat pumps, establish electric-ready requirements for new homes, expand solar photovoltaic (PV) and battery storage standards, strengthen ventilation standards, and more. The 2022 standards require mixed-fuel single-family homes to be electric-ready to accommodate replacement of gas appliances with electric appliances. In addition, the standards also include prescriptive PV system and battery requirements for high-rise, multifamily buildings (i.e., more than three stories) and noncommercial buildings such as hotels, offices, medical offices, restaurants, retail stores, schools, warehouses, theaters, and convention centers. The 2025 Building Energy Efficiency Standards were adopted September 24, 2024, and became effective and replaced the 2022 Building Energy Efficiency Standards on January 1, 2026. Updates under the 2025 Building Energy Efficiency Standards include electric-ready requirements for some multi-family buildings and commercial kitchens and solar and battery energy storage requirements for assembly buildings including religious worship, sports, and recreational buildings.
Under the prescriptive pathway, a new development’s building design is considered the “Standard Design Building,” which represents the energy-efficiency performance of that project should it include all prescribed features (e.g., solar, battery storage) with no additional energy-efficiency features beyond what is required at minimum under the mandatory requirements and prescriptive pathway. A project may still demonstrate compliance using the performance pathway without inclusion of prescriptive features like solar or battery storage. However, that building design must match or exceed the energy efficiency performance of the Standard Design Building. For example, if a project would be required to include solar and battery storage under the prescriptive pathway, it can choose to comply with the performance pathway and not include solar and battery storage so long as it can demonstrate that it would achieve the same energy-efficiency performance as if solar and battery storage were included.
California Building Code: CALGreen
On July 17, 2008, the California Building Standards Commission adopted the nation’s first green building standards. The California Green Building Standards Code (24 CCR, Part 11), or “CALGreen,” was adopted as part of the California Building Standards Code. CALGreen established planning and design standards for sustainable site development, energy efficiency (in excess of the California Energy Code requirements), water conservation, material conservation, Riverview Marketplace Commercial Project
Environmental Impact Report 4.8 Greenhouse Gas Emissions City of Bakersfield – SCH No. 2025101507 4.8-9
and internal air contaminants.1 The mandatory provisions of CALGreen became effective January 1, 2011, and were last updated in 2025. The 2025 CALGreen standards became effective January 1, 2026.
Section 5.408 of CALGreen also requires that at least 65 percent of the nonhazardous construction and demolition waste from nonresidential construction operations be recycled and/or salvaged for reuse.
2006 Appliance Efficiency Regulations
The 2006 Appliance Efficiency Regulations (20 CCR Sections 1601–1608) were adopted by the CEC on October 11, 2006, and approved by the California Office of Administrative Law on December 14, 2006. The regulations include standards for both federally regulated appliances and non–federally regulated appliances. Though these regulations are now often viewed as “business as usual,” they exceed the standards imposed by all other states, and they reduce GHG emissions by reducing energy demand.
Solid Waste Regulations
AB 939, Integrated Waste Management Act of 1989
California’s Integrated Waste Management Act of 1989 (AB 939) set a requirement for cities and counties throughout the state to divert 50 percent of all solid waste from landfills by January 1, 2000, through source reduction, recycling, and composting (Public Resources Code Sections 40050 et seq.). In 2008, the requirements were modified to reflect a per capita requirement rather than tonnage. To help achieve this, the act requires that each city and county prepare and submit a source reduction and recycling element. AB 939 also established the goal for all California counties to provide at least 15 years of ongoing landfill capacity.
AB 341
AB 341 (Chapter 476, Statutes of 2011) increased the statewide goal for waste diversion to 75 percent by 2020 and required recycling of waste from commercial and multifamily residential land uses.
AB 1327
AB 1327, the California Solid Waste Reuse and Recycling Access Act, requires areas to be set aside for collecting and loading recyclable materials in development projects (Public Resources Code Sections 42900 et seq.). The act required the California Integrated Waste Management Board to develop a model ordinance for adoption by any local agency requiring adequate areas for collection and loading of recyclable materials as part of development projects. Local agencies are required to adopt the model or an ordinance of their own.
AB 1826
In October 2014, Governor Brown signed AB 1826, requiring businesses to recycle their organic waste on and after April 1, 2016, depending on the amount of waste they generate per week. This law also required that on and after January 1, 2016, local jurisdictions across the state implement an organic waste recycling program to divert organic waste generated by businesses and multifamily residential dwellings that consist of five or more units. Organic waste means food 1 The green building standards became mandatory in the 2010 edition of the code.
Riverview Marketplace Commercial Project
Environmental Impact Report 4.8 Greenhouse Gas Emissions City of Bakersfield – SCH No. 2025101507 4.8-10
waste, green waste, landscape and pruning waste, nonhazardous wood waste, and food-soiled paper waste that is mixed in with food waste.
Water Efficiency Regulations
SBX7-7
The 20x2020 Water Conservation Plan was issued by the Department of Water Resources (DWR) in 2010 pursuant to Senate Bill 7, which was adopted during the 7th Extraordinary Session of 2009–2010 and therefore dubbed “SBX7-7.” SBX7-7 mandated urban water conservation and authorized the DWR to prepare a plan implementing urban water conservation requirements (20x2020 Water Conservation Plan). In addition, it required agricultural water providers to prepare agricultural water management plans, measure water deliveries to customers, and implement other efficiency measures. SBX7-7 required urban water providers to adopt a water conservation target of 20 percent reduction in urban per capita water use by 2020 compared to 2005 baseline use.
AB 1881
The Water Conservation in Landscaping Act of 2006 requires local agencies to adopt the updated DWR model ordinance or an equivalent. AB 1881 also requires the CEC to consult with the DWR to adopt, by regulation, performance standards and labeling requirements for landscape irrigation equipment, including irrigation controllers, moisture sensors, emission devices, and valves to reduce the wasteful, uneconomic, inefficient, or unnecessary consumption of energy or water.
Short-Lived Climate Pollutant Strategy Reduction
Senate Bill 1383
On September 19, 2016, the Governor signed SB 1383 to supplement the GHG reduction strategies in the Scoping Plan to consider short-lived climate pollutants, including black carbon and methane. Black carbon is the light-absorbing component of fine particulate matter produced during incomplete combustion of fuels. SB 1383 required the state board, no later than January 1, 2018, to approve and begin implementing a comprehensive strategy to reduce emissions of short-lived climate pollutants to achieve a reduction in methane by 40 percent, hydrofluorocarbon gases by 40 percent, and anthropogenic black carbon by 50 percent below 2013 levels by 2030, as specified. The bill also establishes targets for reducing organic waste in landfills. On March 14, 2017, CARB adopted the “Final Proposed Short-Lived Climate Pollutant Reduction Strategy,” which identifies the State’s approach to reducing anthropogenic and biogenic sources of short-lived climate pollutants. Anthropogenic sources of black carbon include on- and off-road transportation, residential wood burning, fuel combustion (charbroiling), and industrial processes.
According to CARB, ambient levels of black carbon in California are 90 percent lower than in the early 1960s despite the tripling of diesel fuel use (CARB 2017a). In-use on-road rules are to reduce black carbon emissions from on-road sources by 80 percent between 2000 and 2020.
Local
City of Bakersfield Metropolitan Bakersfield General Plan.
The City’s Conservation Element of the Metropolitan Bakersfield General Plan (General Plan) has identified the following goals, objectives, and policies aimed at reducing greenhouse gas emissions in the development of the City under the General Plan. Applicable GHG emission reducing goals and policies from the General Plan’s Conservation Element are listed below:
Riverview Marketplace Commercial Project
Environmental Impact Report 4.8 Greenhouse Gas Emissions City of Bakersfield – SCH No. 2025101507 4.8-11
Goals
• Reduce the amount of vehicular emissions in the planning area.
Policies
• Implement the Transportation System Management Program (July 1984) for Metropolitan Bakersfield to improve traffic flow, reduce vehicle trips, and increase street capacity. • Encourage the use of mass transit, carpooling, and other transportation options to reduce vehicle miles traveled.
• Promote the use of bicycles by providing attractive bicycle paths and requiring provision of storage facilities in commercial and industrial projects. • Cooperate with Golden Empire Transit and Kern Regional Transit to provide a comprehensive mass transit system for Bakersfield; require large-scale new development to provide related improvements, such as bus stop shelters and turnouts. • Encourage walking for short-distance trips through the creation of pedestrian-friendly sidewalks and street crossings.
• Encourage the use of alternative fuel and low or zero-emission vehicles (I-5, I-6).
4.8.2 Environmental Setting
Climate Change Setting
Scientists have concluded that human activities are contributing to global climate change by adding large amounts of heat-trapping gases, known as GHGs, to the atmosphere. The primary source of these GHGs is fossil fuel use. The IPCC) has identified four major GHGs—water vapor, carbon dioxide (CO2), methane (CH4), and ozone (O3)—that are the likely cause of an increase in global average temperatures observed in the 20th and 21st centuries. Other GHGs identified by the IPCC that contribute to global warming to a lesser extent are nitrous oxide (N2O), sulfur hexafluoride (SF6), hydrofluorocarbons, perfluorocarbons, and chlorofluorocarbons (IPCC 2001).2,3 The major GHGs are briefly described below.
• Carbon dioxide (CO2) enters the atmosphere through the burning of fossil fuels (oil, natural gas, and coal), solid waste, trees and wood products, and respiration, and also as a result of other chemical reactions (e.g., manufacture of cement). Carbon dioxide is removed from the atmosphere (sequestered) when it is absorbed by plants as part of the biological carbon cycle.
• Methane (CH4) is emitted during the production and transport of coal, natural gas, and oil.
Methane emissions also result from livestock and other agricultural practices and from the decay of organic waste in municipal landfills and water treatment facilities. 2 Water vapor (H2O) is the strongest GHG and the most variable in its phases (vapor, cloud droplets, ice crystals). However, water vapor is not considered a pollutant, because it is considered part of the feedback loop rather than a primary cause of change. 3 Black carbon contributes to climate change both directly, by absorbing sunlight, and indirectly, by depositing on snow (making it melt faster) and by interacting with clouds and affecting cloud formation. Black carbon is the most strongly light-absorbing component of particulate matter emitted from burning fuels such as coal, diesel, and biomass. Reducing black carbon emissions globally can have immediate economic, climate, and public health benefits. California has been an international leader in reducing emissions of black carbon, with close to 95 percent control expected by 2020 due to existing programs that target reducing particulate matter from diesel engines and burning activities (CARB 2017a). However, state and national GHG inventories do not include black carbon yet due to ongoing work resolving the precise global warming potential of black carbon. Guidance for CEQA documents does not yet include black carbon.
Riverview Marketplace Commercial Project
Environmental Impact Report 4.8 Greenhouse Gas Emissions City of Bakersfield – SCH No. 2025101507 4.8-12
• Nitrous oxide (N2O) is emitted during agricultural and industrial activities as well as during the combustion of fossil fuels and solid waste.
GHGs are dependent on the lifetime, or persistence, of the gas molecule in the atmosphere. Some GHGs have a stronger greenhouse effect than others. These are referred to as high global warming potential (GWP) gases. The GWP of GHG emissions are shown in Table 4.8-1, GHG Emissions and Their Relative Global Warming Potential Compared to CO2. The GWP is used to convert GHGs to CO2-equivalence (CO2e) to show the relative potential that different GHGs have to retain infrared radiation in the atmosphere and contribute to the greenhouse effect. For example, under IPCC’s Fifth Assessment Report (AR5), GWP values for CH4, 10 metric tons (MT) of CH4 would be equivalent to 280 MT of CO2.
Table 4.8-1 -GHG Emissions and Their Relative Global Warming Potential Compared to CO2
GHGs Carbon Dioxide (CO2) Methane1(CH4) Nitrous Oxide (N2O) Fourth Assessment
Global Warming Potential Relative to
CO2
2 1 25 298
Fifth Assessment
Global Warming Potential Relative to
CO2
2 1 28 265
Sixth Assessment
Global Warming Potential Relative to
CO2
2 1 30 273
Source: IPCC 2007, 2013, and 2023.
Notes: The IPCC published updated GWP values in its Sixth Assessment Report (AR6) that reflect latest information on atmospheric lifetimes of GHGs and an improved calculation of the radiative forcing of CO2. However, GWP values identified in AR5 are used by the 2022 Scoping Plan for long-term emissions forecasting.
1 The methane GWP includes direct effects and indirect effects due to the production of tropospheric ozone and stratospheric water vapor. The indirect effect due to the production of CO2 is not included.
2 Based on 100 year time horizon of the GWP of the air pollutant compared to CO2.