Cities Index.
Agenda packet

Bell Gardens City Council
March 9, 2026

Document
Agenda packet
Meeting
March 9, 2026
Body
Bell Gardens City Council
Pages
796
Original file
1.5 MB
Text extracted from the city's file for reading and search. Open the original on portal.laserfiche.com. That file is the official record.

Agreement, the term "Documents and Data" means and includes all reports, analyses, correspondence, plans, designs, notes, summaries, strategies, charts, schedules, spreadsheets, calculations, lists, data compilations, documents or other materials developed and/or assembled by or on behalf of CONSULTANT in the performance of this Agreement and fixed in any tangible medium of expression, including but not limited to Documents and Data stored digitally, magnetically and/or electronically. This Agreement creates, at no cost to CITY, a perpetual license for CITY to copy, use, reuse, disseminate and/or retain any and all copyrights, designs, and other intellectual property embodied in all Documents and Data. CONSULTANT will require all subcontractors and subconsultants working on behalf of CONSULTANT in the performance of this Agreement to agree in writing that CITY will be granted the same right to copy use, reuse, disseminate and retain Documents and Data prepared or assembled by any subcontractor or subconsultant as applies to Documents and Data prepared by CONSULTANT in the performance of this Agreement.

6.2 CONFIDENTIALITY: All data, documents, ;discussion, or other information developed or received by CONSULTANT or provided for performance of this Agreement are deemed confidential and will not be disclosed by CONSULTANT without prior written consent by CITY. CITY will grant such consent of disclosure as legally required. Upon request, all CITY data will be returned to CITY upon the termination or expiration of this Agreement. CONSULTANT will not use CITY's name or insignia, photographs, or any publicity pertaining to the Work in any magazine, trade paper, newspaper, television or radio production or other similar medium without the prior written consent of CITY.

6.3 FALSE CLAIMS ACT: CONSULTANT warrants and represents that neither CONSULTANT nor any person who is an officer of, in a managing position with, or has an ownership interest in CONSULTANT has been determined by a court or tribunal of competent jurisdiction to have violated the False Claims Act, 31 U.S.C., Section 3789 et seq., and the California False Claims Act, Government Code Section 12650 et seq.

6.4 NOTICES: All notices permitted or required under this Agreement will be given to the respective Parties at the following addresses, or at such other address as the respective Parties may provide in writing for this purpose:

CONSULTANT:

CITY:

City of Bell Gardens
7100 S. Garfield Avenue
Bell Gardens, CA 90201
Attn. ._., ,. .. .,. ..., ...M .m
Phone:

Such notices will be deemed effective when personally delivered or successfully transmitted by facsimile as evidenced by a fax confirmation slip or when mailed, forty-eight (48) hours after deposit with the United States Postal Service, first class postage prepaid and addressed to the Party at its applicable address. 16

Page 144 of 797 ends

6.5 COOPERATION FURTHER ACTS: The Parties will fully cooperate with one another and will take any additional acts or sign any additional documents as are reasonably necessary, appropriate or convenient to achieve the purposes of this Agreement.

6.6 SUBCONTRACTING: CONSULTANT will not subcontract any portion of the Work required by this Agreement, except as expressly stated herein, without the prior written approval of CITY. Subcontracts (including without limitation subcontracts with subconsultants), if any, will contain a provision making them subject to all provisions stipulated in this Agreement, including provisions relating to insurance requirements and indemnification.

6.7 CITY'S RIGHT TO EMPLOY OTHER CONSULTANTS: CITY reserves the right to employ other contractors in connection with the various projects worked upon by CONSULTANT.

6.8 PROHIBITED INTERESTS: CONSULTANT warrants, represents and maintains that it has not employed nor retained any, company, or person, other than a bona fide employee working solely for CONSULTANT, to solicit or secure this Agreement. Further, CONSULTANT warrants and represents that it has not paid, nor has it agreed to pay any company or person, other than a bona fide employee working solely for CONSULTANT, any fee. commission, percentage, brokerage fee, gift or other consideration contingent upon or resulting from the award or making of this Agreement. For breach or violation of this warranty, CITY will have the right to rescind this Agreement without liability. For the term of this Agreement, no member, officer or employee of CITY, during the term of his or her service with CITY, will have any direct interest in this Agreement, or obtain any present or anticipated material benefit arising therefrom.

6.9 TIME IS OF THE ESSENCE: Time is of the essence for each and every provision of this Agreement.

6.10 GOVERNING LAW AND VENUE: This Agreement will be interpreted and governed according to the laws of the State of California. In the event of litigation between the Parties, the venue, without exception, will be in the Los Angeles County Superior Court of the State of California. If, and only if, applicable law requires that all or part of any such litigation be tried exclusively in federal court, the venue, without exception, will be in the Central District of California located in the City of Los Angeles, California.

6.11 ATTORNEYS' FEES: If either Party commences an action against the other Party, legal, administrative or otherwise, arising out of or in connection with this Agreement, the prevailing Party in such litigation will be entitled to have and recover from the losing Party reasonable attorneys' fees and all other costs of such action.

6.12 SUCCESSORS AND ASSIGNS: This Agreement will be binding on the successors and assigns of the Parties.
17

Page 145 of 797 ends

6.13 NO THIRD -PARTY BENEFIT: There are no intended third -party beneficiaries of any right or obligation assumed by the Parties. All rights and benefits under this Agreement inure exclusively to the Parties.

6.14 CONSTRUCTION OF AGREEMENT: This Agreement will not be construed in favor of, or against, either Party but will be construed as if the Parties prepared this Agreement together through a process of negotiation and with the advice of their respective attorneys.

6.15 SEVERABILITY: If any portion of this Agreement is declared invalid, illegal, or otherwise unenforceable by a court of competent jurisdiction, the remaining provisions will continue in full force and effect.

6.16 AMENDMENT; MODIFICATION: No amendment, modification or supplement of this Agreement will be valid or binding unless executed in writing and signed by both Parties, subject to CITY approval. The requirement for written amendments, modifications or supplements cannot be waived and any attempted waiver will be void and invalid.

6.17 CAPTIONS: The captions of the various articles, sections and paragraphs are for convenience and ease of reference only, and do not define, limit, augment, or describe the scope, content, or intent of this Agreement.

6.18 INCONSISTENCIES OR CONFLICTS: In - the event of any conflict or inconsistency between the provisions of this Agreement and any of the exhibits attached hereto, the provisions of this Agreement will control.

6.19 ENTIRE AGREEMENT: This Agreement, including all attached exhibits, constitutes the entire, complete, final and exclusive expression of the Parties with respect to the matters addressed herein and supersedes all other agreements or understandings, whether oral or written, which may have been entered into between CITY and CONSULTANT prior to the execution of this Agreement. Any statements, representations, or other agreements, whether oral or written, made by either Party that is not embodied herein will not be valid or binding on the Parties. No amendment, modification or supplement to this Agreement will be valid and binding unless in writing and duly executed by the Parties pursuant to Section

6.16, above.

6.20 FORCE MAJEURE: The Term shall be extended in the event of any delays due to unforeseeable causes beyond the control of CONSULTANT and without the fault or negligence of CONSULTANT, including but not limited to severe weather, fires, earthquakes, floods, epidemics, quarantine restrictions, riots, strikes, freight embargoes, wars, litigation, and/or acts of any governmental agency, including the CITY. CONSULTANT shall within three (3) calendar days of the commencement of such delay notify the City Representative in writing of the causes of the delay.

The City Representative shall ascertain the facts and the extent of delay and extend the time for performing the services for the period of the enforced delay when and if in the judgment of the City Representative such delay is justified. The 18

Page 146 of 797 ends

City Representative's determination shall be final and conclusive upon the parties to this Agreement. In no event shall CONSULTANT be entitled to recover damages against the CITY for any delay in the performance of this Agreement, however caused, CONSULTANT's sole remedy being extension of the Agreement pursuant to this Section.

6.21 COUNTERPARTS: This Agreement may be executed in any number of counterparts, each of which shall be deemed an original, but all of which when taken together shall constitute one and the same instrument. No handwritten or typewritten amendment, modification or supplement to any one counterpart will be valid or binding unless made to all three counterparts in conformity with Section

6.16, above. One fully executed original counterpart will be delivered to CONSULTANT and two original counterparts will be retained by CITY. (SIGNATURES ON NEXT PAGE)
19

Page 147 of 797 ends

IN WITNESS WHEREOF, the Parties hereto have caused this Agreement to be executed the day and year first appearing in this Agreement, above.

CITY OF BELL GARDENS:

By: By:

Name: Name:

Title:

Date:

APPROVED AS TO FORM:

By:

Stephanie Vasquez, City Attorney
20

Page 148 of 797 ends

EXHIBIT "A"

CITY RFP
21

Page 149 of 797 ends

EXHIBIT "B"

CONSULTANT PROPOSAL
22

Page 150 of 797 ends

EXHIBIT "B"

CONSULTANT PROPOSAL
22

Page 151 of 797 ends
Page 152 of 797 ends

Creating
Environments
People
Enjoy°
October 2, 2025
Mr. Bernardo Iniguez
Director of Public Works/
Facilities
City of Bell Gardens
8327 Garfield Avenue
Bell Gardens, CA 90201
RRM Design Group
Main Office:

San Juan Capistrano
a: 32332 Camino
Capistrano, Ste 205
San Juan Capistrano,
CA 93401
p: (949) 361-7950
e: www.rrmdesign.com
Headquarters:

Son Luis Obispo
a: 3765 5. Higuera 5t, Ste 102
San Luis Obispo, CA 93401
p: (805) 543-1794
e: www.rrmdesign.com
Re: Design, Architecture and Engineering Services for The Veterans Park Refurbishment and Restroom Renovation
Dear Mr. Bernardo Iniguez,
The City of Bell Gardens has issued an RFP searching for a consulting team to improve the existing infrastructure at Veterans Park. Please accept this proposal from RRM Design Group as our sincere interest in collaborating with you to implement your project goals. Our team of landscape architects, engineers and architects are all in- house experts in community park design. We have organized our submittal to illustrate our design creativity and technical experience that will provide you with professional service and a finished project that the community will embrace.

Just three miles from you in Downey we worked with the City to renovate Furman Park.

The project has several similarities to your RFP goals and stated objectives- including a list of important improvements completed on schedule and within the available grant budgets. The difference you can see when visiting the park —the character and beauty of the park did not come at the expense of meeting the project objectives. This is a hallmark of our work at RRM Design Group.

RRM Design Group, founded in 1974 has seven offices including a multi -discipline team in San Juan Capistrano. We have been designing and completing projects like Veterans Park for more than 35 years. The team shown on page 56 that will collaborate with your team has been working together on Community Parks for over a decade - Jeff and Amanda for 20 years.

Our proposal includes a detailed scope of work and deliverables outlined to show exactly how we will complete the work. The Methodology section - page 9, explains our view of the potential we think your project has beyond updating the infrastructure.

We intend to show you that RRM will do the most with the budget you have and bring character (place making) to the features and park spaces that we update on your behalf.

It is our hope that after reviewing our experience for public agencies throughout California, and reading our collaborative approach for Veterans Park, you may elect to visit Furman Park in Downey to see how we added a bit of beauty to the practical updates of park features, amenities, and infrastructure. Please select us to interview for the project and tell you more about our experience and ideas for your project. If RRM is selected for an interview, we would be happy to talk through the schedule and fee that accompany this proposal, Together, we can look for ways to save time and money by streamlining design process. As an Employee -Owned company- we love what we do, and your community will see the benefits.

We appreciate your consideration of our proposal. We can see that this is an important community asset and meeting place. We would love to help bring new energy and life to the spaces within Veterans Park.

Sincerely,
RRM Design Group
Jeff Ferber, ASLA, PLA
Managing Partner
Principal -in -Charge
RachaerGuraydin Amanda Seibel, PLA
Senior Landscape Architect
Project Manager
Design Director
Project Director

Page 153 of 797 ends

Proposal For Design, Architecture and Engineering Services for The Veterans Park Refurbishment and Restroom Renovation
Graphics & Photographs:

This document features images of RKM Design Group and its sub consultant partners' projects, the graphics ondphotos of which ore owned, copyrighted, and/or licensed by our respective firms. Some images may be modified due to privacy concerns.

About RRM Design Group:
3/65 South Higuera St, Ste 102 • San Luis Obispo, CA 934O1 • (805) 543-1794 • rrmdesign.com • A California corporation • Leonard Grant, Architect C26973 • Robert Comocho, PE 76597 • Steven Webster, LS 7561 • leff Ferber, PTA 2844 The written and graphic materials contained in this proposal are the exclusive property of RRM Design Group. The unauthorized use of any portion of these text or graphic materials without'SRM's prior written consent is expressly prohibited. ©2025 RRM Design Group

Page 154 of 797 ends

50 Years of Creating Environments People Enjoy
The soul of RRM is people: the employee -owners that make up our organization AND the people that we're creating environments for. For our clients, our relationship starts and ends with excellent communication.

As employee -owners, our staff welcomes diverse ideas and consistent improvement. After all, this company belongs to us! We strive to be a force for good in our communities, leaving things better than we found them. We get enjoyment, not only from our own work, but from seeing the lives of others enriched. That's why we're Creating Environments People Enjoy, a commitment that has fueled our success for fifty years.

From the inception of our journey to our current state of expansion, our team of architects, landscape architects, engineers, surveyors, and planners collaborates closely with clients to shape our communities. Whether the project is public or private, commercial or residential, we excel in attentive listening, thoughtful design, and timely, budget -conscious delivery —values we've upheld since our establishment in 1974.

We're doing
an incredible
arnount of work:

L
RRM projects in
the last decade
Our clients enjoy
the experience of
working with us:

R„s ., k N P S
(Overall Net
Promoter Score)
well above AEC
industry average
of 7.2
Our employees like their
careers at RRM:
c: II≥,;,3 c : "v F rrn
k for'
2022, 2023, 2024, 2025
- Zweig Group
7 RRM Offices
Main Office: Son Juan Capistrano
32332 Camino Capistrano, Ste. 205
Son Juan Capistrano, CA 92675
p: (949) 361-7950
Headquarters: San Luis Obispo
3765 South Higuera St., Ste. 102
San Luis Obispo, CA 93401
p: (805) 543-1794
All offices: San Diego, Ventura,
Santa Barbara, San Luis Obispo, San
Leandro, and Seattle
200+ Employees
in 6 Disciplines
• Architects
• Civil Engineers
• Landscape Architects
• Planners & Urban Designers
• Structural Engineers
• Surveyors
100% Employee -
Owned Firm
RRM Design Group is a California
corporation and a 100%
employee -owned company (ESOP),
incorporated November 26, 1974
RRM Design Group

Page 155 of 797 ends

"tit
At RRM Design Group, community is at the core of everything we do from our "1000 Hours Program" and Volunteer Time Off (VTO) to our "Draws with a Cause" initiative, which connects our design expertise with nonprofits to support community -driven visions. These values guide our approach to every project. RRM recently was honored with the 2025 AEC "Building a Better World" Award by PSMJ Resources, Inc. We will bring this same passion and purpose to the revitalization of Veterans Park in the City of Bell Gardens, a space we understand to be deeply rooted in cultural significance and community pride. Our team is committed to designing a welcoming, inclusive, and multi -use destination that reflects the identity of Bell Gardens and enhances everyday life for its residents. With thoughtful improvements from Ross Hall renovations to new shade structures, amphitheater spaces, and gardens we aim to create a park that honors veterans, celebrates local culture, and becomes a beloved neighborhood hub. Guided by collaboration, cultural sensitivity, and a strong track record of delivering impactful, cost-effective solutions, we are excited to help bring the City's vision for Veterans Park to life.

San Luis Obispo Food Bank - RRM Volunteers
RRM Design Group
Malezi Secondary School - Draws with a Cause, RRM Program ww'
• Boone Chapel - Draws with a Cause, RRM Program
People's Self Help Housing Builder Games
7

Page 156 of 797 ends
Page 157 of 797 ends

Proposal for
Design, Architecture and Engineering Services for The Veterans Park Refurbishment and Restroom Renovation
RRM Project Pictured:

Downey Measure S Park Improvement
Projects - Furman Park, Downey, CA
9

Page 158 of 797 ends

RRM Project Pictured: Columbus Sports Park Mosier Pion and Soccer Facility Design, Son Jose, GA and Met , r< f,
,r`�� �r,.s ;�� (�„ `�,,.�`' �t; spa �� ��"�� s � "n„� .� a� `iY,�w �, l.,,y c' to,,,.,; o Veterans Park is the heart of Bell Gardens. For this project to be successful, several key factors must guide our approach. Because it is grant -funded, we recognize the importance of working within a fixed deadline, delivering on a defined program of amenities, and staying within a strict budget. Yet above all, we believe the park must maintain it's beauty, character, and status —a community landmark worthy of its central place in the heart of Bell Gardens.

RRM Design Group has successfully navigated these same challenges across many grant -funded projects in California, consistently balancing compliance, budget, and design excellence. We are excited by the list of proposed amenities and improvements, and in the following pages we've highlighted a few that particularly resonate with us —illustrating how we can bring them to life at Veterans Park. 10 City of Bell Gardens Pr000sai for .t.,.,
Design, Architecture and Engineering Services for The Veterans Park Refurbishment and RestroomI Page 159 of 797

One of the most exciting opportunities at Veterans Park is the City's intent to build a new amphitheater. The setting is truly unique —framed by the Hispanic American Veterans Memorial and embraced by mature trees, this future stage will become a focal point unlike any other in the region. It will not only host performances, but also serve as a civic gathering place that honors history, culture, and community.

RRM has designed amphitheaters in existing public parks, from large-scale venues such as Zumwalt Park in Tulare (pictured below, left) to more intimate gathering spaces like King City Plaza (pictured below right).

Additionally, we recently completed the conceptual design for a versatile amphitheater stage at Channel Islands Harbor. Designed to support theft popular Concerts by the Sea series, the stage also functions as a rentable picnic shelter when not in use for performances —creating a dynamic, multi -use space that serves the community year-round.

Methodology Section 1

Page 160 of 797 ends

From this experience, we know that a successful amphitheater must harmonize function, experience, and environment. At Veterans Park, this means:
• Memorial Integration: framing the Veterans Memorial with dignity and reverence • Topography: utilizing the natural slope without major excavation • Audience Experience: clear sightlines, ADA accessibility, and comfort for all • Programming Collaboration: Where possible, collaborating with Program Directors to ensure the venue's infrastructure is thoughtfully detailed to evolve with future needs —whether for sound, lighting, or acoustic requirements
• Flexible Seating: blending lawn and fixed seating for both large events and everyday use With this layered approach, the amphitheater will become more than a stage —it will be the heart of the park's programming for generations to come.

In Bell Gardens, shade is not a luxury —it's a necessity. We see both the challenge and the opportunity at Veterans Park: some shade structures need renovation or replacement, while high -use areas such as the courts, playground, picnic zones, and outdoor fitness require new, thoughtfully integrated shade solutions.

RRM balances impact and budget through a layered strategy: blending refurbished structures, new shade sails, and architectural elements that can be phased or scaled to match funding. We focus on high -activity zones first, ensuring maximum daily benefit, and design each element to strengthen the park's character and beauty.

RRM has applied this approach in parks across California, including Greystone Park in Bakersfield (pictured on page 13, upper right) and the Alex Fiore Teen Center in Thousand Oaks (pictured on page 13, upper left), where we delivered budget -conscious shade strategies that were both durable and beautiful, Veterans Park deserves no less.
1 City of Bell Gardens I Proposal for
Design, Architecture and Engineering Services for The Veterans Park Refurbishment and Restroom Page 161 of 797

Another transformative opportunity lies in therapeutic gardens, new landscaping, and expanded walking paths. Few design moves elevate a park as quickly as replacing turf with thoughtfully planted landscapes.

With Veterans Park's existing tree canopy as a foundation, there is an opportunity to create healing garden moments, connective paths, and landscapes that enrich both beauty and experience. 13

Page 162 of 797 ends

Methodology I Section 1

RRM believes small details create big impact —whether through sensory plantings, artful stonework, or carefully aligned circulation. Our designs balance budget -conscious durability with unique, water -wise beauty.

We've demonstrated this in projects across the state: at Olympus Park in Encinitas (pictured below), the design includes playful healing elements like a granite sphere and pebble spiral reflexology terrace, while ensuring low-water, resilient planting in partnership with the San Diego Botanic Garden.

At Furman Park in Downey (pictured below), we transformed large turf areas (especially near the playground) into low-water landscapes and circulation was reworked with decomposed granite paths, making the park's connections more fluid and intuitive.

These same strategies will guide us at Veterans Park, ensuring gardens and pathways that are restorative, connected, and beautiful.
14 City of Bell Gordens I Proposal for
Design, Architecture and Engineering ServicesforThe Veterans Park Refurbishment and Restroom Renovation

Page 163 of 797 ends

RRM Design Group thrives on creating environments that communities enjoy and rely on. The planned interior renovations to the Ross Hall Recreation Center and Cultural Center, along with the proposed new freestanding restroom facility, present an exciting opportunity to reimagine and re -energize these essential amenities at Veterans Park.

At RRM, our greatest strength lies in our integrated, multidisciplinary team —architects, landscape architects, engineers, and surveyors —all collaborating under one roof. This structure enables us to deliver efficient, cohesive solutions that are creative, functional, and cost-conscious.

We've successfully applied this approach on similar projects, including the renovation of the Alex Fiore Teen Center and Goebel Adult Center for the City of Thousand Oaks (pictured below), where we upgraded aging facilities with strategic improvements to kitchens, restrooms, and multipurpose spaces. At Furman Park (pictured bottom of page 14), our team seamlessly integrated ADA upgrades into community buildings through a combined landscape and architectural effort.

At Veterans Park, we'll apply the same thoughtful methodology: upgrading the Community Center and kitchen, designing durable, well -integrated restrooms and storage near the baseball fields, and modernizing Ross Hall with accessible stage ramps, improved lighting, and mitigation of hazardous finishes.

Kitchen renovations will enhance service capacity for the Bell Gardens community, while the addition of multifunctional shade and sanitation facilities will expand the park's flexibility and comfort.

Together, these enhancements will ensure that Veterans Park remains a functional, welcoming, and future - ready space for all.

Methodology I Section 1
15

Page 164 of 797 ends

Building on this project understanding, our approach and methodology can be summarized in three core commitments:

Our dedicated Parks and Recreation team combines landscape architects, architects, engineers, surveyors, and planners —all in -house —supported by trusted consultants P2S for mechanical, electrical, and plumbing, OCMI for construction cost estimation, CBelow for utility mapping, and GPI for geotechnical engineering.

With more than 270 park projects designed and constructed, we know how to streamline the process, avoid common pitfalls, and deliver accurate, buildable construction documents.

We will value the local knowledge and expertise of the City of Bell Gardens staff and are committed to working in true partnership. At Furman Park in Downey, this collaboration enabled us to meet grant requirements, stay on budget, and deliver on time, while transforming the park into an elevated community asset. At Veterans Park, we will apply this same responsive, collaborative model with constant check -ins.

We understand and acknowledge your construction budgets of approximately $3.3M for park renovation and $1.8M for restroom renovation/replacement. Our team is experienced in maximizing value within tight parameters —evaluating material options, considering constructability, structuring bid alternates, and developing creative solutions. While touring the park during the mandatory pre -proposal meeting and on a weekend, our team put our heads together and started brainstorming some potential cost savings solutions:
• Combining restroom + shade: designing the baseball field restroom/storage with integrated shade to stretch the budget and serve multiple needs
• Dual-purpose amphitheater structure: At Channel Islands Harbor (pictured below), we designed a structure that functions as both a concert venue for their Concerts by the Sea series and a rentable picnic shelter year-round. A similar approach at Veterans Park could provide performance space and flexible everyday use —maximizing functionality while reducing costs through shared infrastructure. 16 City of Bell Gardens I Proposal for
Design, Architecture and Engineering Services for The Veterans Park Refurbishment and Restroom

Page 165 of 797 ends

• Flooring efficiencies: installing rubberized sports flooring over existing surfaces to avoid hazardous abatement costs
• Splash pad alternatives: providing interactive water features like bubbling rocks that deliver play value without the expense and maintenance of a full splash pad. These could also serve as beautiful healing elements when paired with the therapeutic garden spaces.

These are just a few examples of how our team thinks creatively and pragmatically to achieve budget and schedule goals.

On the following pages, we outline a detailed scope of services —a step-by-step plan showing how we will partner with you from concept development through construction documents and into implementation.

Our process is clear, collaborative, and proven, ensuring that every task moves the project closer to a successful outcome.

RPM Design Group is passionate about making Veterans Park a success for Bell Gardens. With extensive experience in grant -funded park projects, a strong track record of collaboration, and a commitment to design excellence, we are prepared to deliver a park that meets your schedule, respects your budget, and will be deeply loved by your community. Together, we will enhance and beautify Veterans Park — helping to ensure it remains a vibrant, welcoming, and enduring landmark that both honors its legacy and serves future generations.

Pictured: Photo Courtesy of Richter Spielgeraete - Water Ploy Methodology I Section 1
I/

Page 166 of 797 ends

RRM Project Pictured: Columbus Sports Pork Master Plan and Soccer Facility Design, Sari Jose, CA Exhibit "A" Scope of Services
18 City of Bell Gardens Prnnncal fnr Mt
Design, Architectureand Engineering Services for The Veterans Park Refurbishment and Restroom I Page 167 of 797

k Re
Task 1: Project Initiation and Feasibility Phase
Subtask 1.01: Project Kickoff Meeting & Field Investigation Subtask 1.02:

Subtask 1.03:

Subtask 1.04:

Background Data Collection & Review
Topographic Survey/Base Mapping
CEQA Compliance
Task 2: Design Development Services
Subtask 2.01:

Subtask 2.02:

Subtask 2.03:

Subtask 2.04:

Subtask 2.05:

Conceptual Design Alternatives
Draft Schematic Plan
Key Stakeholder Meetings
Final Schematic Plan
30% Design Development & Phasing Plan
Task 3: Construction Document Services
Subtask 3.01:

Subtask 3.02:

Subtask 3.03:

Subtask 3.04:

Subtask 3.05:

Subtask 3.06:
65% Draft Construction Documents
90% Draft Construction Documents
100% Draft Construction Documents
Permit Processing Assistance
Bid -Ready Construction Documents
LID Standard Manual Compliance Report
Task 4: Construction Support Services
Subtask 4.01.: Bidding Support
Subtask 4.02: Construction Administration Support
Subtask 4.03: Construction Observation
Subtask 4.04: Record Drawings
Task 5: Project Coordination Services
Subtask 5.01:

Subtask 5.02:

Subtask 5.03:

Project Coordination & Management
Project Development Team Meetings
QA/QC Review
Task 6: Optional Services
Subtask 6.01: Schematic Renderings
Subtask 6.02_: Supplemental Survey
Subtask 6.03: Public Hearing Study Session — Draft Schematic Plan Subtask 6.04: Stormwater Pollution Prevention Plan (SWPPP) Methodology Section 1
19

Page 168 of 797 ends

RRM Project Pictured: San Pablo Park - Tennis Court Shade Covered Bleachers, Berkeley, CA Detailed
Proioct Initiation and w s �..„, i t Phase
•.a
�� 1��,3�,F s ��l,tt 3 e „�ti"�r
Subtask 1.01 - Project Kickoff Meeting & Field Investigation RRM will conduct one (1) virtual kickoff meeting attended by the City's project management team, key Parks and Recreation staff, and key RRM team members will attend this meeting. Principally, this meeting will provide an opportunity to discuss and confirm the key park program elements as presented in the RFP and required by the grant.

Following the kickoff meeting, RRM and the project team will be available to walk the project site with City staff to discuss the project further and review it in greater detail. The site walk will provide an opportunity to inspect and photo log the existing facilities, including Ross Hall, amphitheater location, shade sail locations, sports courts, and landscape areas.

Deliverables:
• Prepare for and conduct one (1) virtual kickoff meeting and one (1) site walk • Meeting notes
Subtask 1.02: Background Data and Collection Review
RRM will collect from the city relevant project data for the design effort, including but not limited to:
• Existing improvement drawings for the park and historic structures • Record data
• City GIS databases
• City utility information and plans
• Recreation and event programming plans
• Underground and overhead utility plat maps and data
• Standard City details and specifications
• Sample bid documents (plans and specifications) from recent similar projects RRM's team will review this data for completeness and may request additional information from the City, as necessary, to analyze the project background and establish a database that will play a critical role in assessing all aspects of the park's design.

Deliverables:
• Collect and review relevant data as noted above
• Compile data in a portable file for use by the Client and design team City of Bell Gardens Proposal for flai
Design. Architecture and Engineering Services for The Veterans Park Refurbishment and Restroom Page 169 of 797

Subtask 1.03: Topographic Survey/Base Mapping
RRM will conduct survey work to create a base map file suitable for conceptual engineering and design work.

The topographic survey work will include the following components:

Aerial Photo Control and Coordination
RRM will facilitate the coordination of aerial mapping with an aerial photogrammetrist. This task will include establishing horizontal and vertical survey control. Horizontal control will be based on California State Plane Coordinates. The vertical datum will be established from National Geodetic Survey monuments and will be North American Vertical Datum 1988. RRM's surveyors will coordinate with the photogrammetrist to obtain aerial photography suitable for compiling a topographic map at a scale of 1" = 20' showing contours at 0.5 - foot intervals with planimetric features, including detail on roads, structures, fences, power poles, trees, brush, and other aboveground features according to standard practice. The contour information on the aerial mapping will only be visible in the open areas. The areas obstructed by tree cover will not show contour information. Accuracy will equal or exceed national map accuracy standards for large-scale topographic maps compiled by photogrammetric methods. The finished product will be available in a digital format compatible with AutoCAD Civil 3D.

Supplemental Topographic Survey
RRM will perform topographic surveying and mapping to supplement aerial photography. The collected data will be incorporated into a digital base map for use in the design. Topographic spot elevations will be taken to quality control the elevations shown on the aerial mapping. The horizontal and vertical datum will be based on the CCS83 (2011) State Plane Coordinates and NAVD 88 when suitable local agency datum's are unavailable • Contours at one -foot intervals
• Footprints of existing buildings and other structures • Trees greater than 2" in diameter with trunk diameter (dbh) and canopy • Above ground evidence of utilities, location and invert at accessible storm drain manholes, inlets and sanitary sewer manholes, water valves, fire hydrants, light standards, electric boxes, valve boxes and power poles, including sidewalks, curb, gutter and mow curbs • Other features as required by the design team
Deliverables:
• Digital topographic map file in AutoCAD format
• Digital Terrain Model
• Color digital orthophotos
Subtask 1.04: CEQA Compliance
RRM will conduct survey work to create a base map file suitable for conceptual engineering and design work.

The topographic survey work will include the following components:

Aerial Photo Control and Coordination
Improvements for Veterans Park would be considered a project under the California Environmental Quality Act (CEQA) and will require appropriate environmental compliance documentation. Article 19 of the CEQA Guidelines provides a list of classes of projects which have been determined not to have a significant effect on the environment and therefore can be exempt from the provisions of CEQA. The scope of work includes improvements in the park mainly to upgrade existing facilities such as the renovation of existing sports courts, and the renovation and relocation of a bathroom building and storage building. Other proposed enhancements include new gardens, picnic areas, a shade sails, lighting improvements, an amphitheater, and refreshed landscaping. Based on these assumptions, the project preliminarily appears to qualify for a Categorical Exemption through several categories including Class 1 (Existing Facilities), Class 2 (Replacement or Reconstruction), Class 4 (Minor Alterations to Land), and Class 23 (Normal Operations of Facilities for Public Gatherings).

Methodology Section 1 21

Page 170 of 797 ends

RRM proposes to analyze the project for CEQA compliance and anticipates preparation of a Notice of Exemption (NOE) using the standard Notice of Exemption form contained in Appendix E of the CEQA Guidelines with a brief supporting analysis relying on existing available information. No new technical analyses are proposed, Within five days following the approval of park improvements, RRM will post the NOE with the County of Los Angeles County Clerk, and City staff will be responsible for posting the NOE at City facilities.

In the event proposed improvements are more substantial and determined to potentially have a significant effect on the environment, RRM would outline needed strategies, and this task and budget would be reviewed and rescoped as needed.

Deliverables:

Review of existing available, relevant documentation
Notice of Exemption (NOE) completed form with brief supporting analysis D
Subtask 2.01: Conceptual Design Alternatives
Based on the project data developed in Task 1 and the programming elements important to the city, RRM's team will prepare up to two (2) conceptual design alternatives for Veterans Park to explore various renovation possibilities. The alternatives will illustrate such things as the amphitheater, shade sails, therapeutic gardens, Ross Hall improvements, and other park amenities. The layout of the park will be communicated through color plan graphics to help communicate park's design. The draft alternatives will be presented as color plans, schematic in nature for clarity while allowing for efficient modifications and refinements. The alternatives will be given to RRM's construction cost estimator, OCMI, to provide conceptual level estimates for each plan.

RRM will package the draft conceptual design alternatives for City input.

Deliverables:
• Two (2) conceptual design alternatives in plan format. • Supporting imagery boards to help illustrate vision and character. • Two (2) conceptual design cost estimates
Subtask 2.02: Draft Schematic Plan
Based on direction from the City on the Conceptual Design Alternatives, RRM will develop a draft schematic plan prepared at a level for presentation to the City's Key Stakeholders. The draft schematic plan will illustrate the park's refurbishment design and layout aspects as follows:

Recreation Design
RRM's will develop an overall site plan focusing on the recreational hardscape features to illustrate the layout, character, and function of the stage and amphitheater, shade sails, court resurfacing, and therapeutic garden spaces. The site plan will also show how the park's new and upgraded aspects with be integrated with elements of the park that will remain. To help illustrate the draft schematic plan and convey the design intent, RRM will prepare a colored and labeled plan view for use in meetings and media posts.

Ross Hall
For Ross Hall, RRM will use the Owner provided existing conditions documents to develop the renovation into a Draft Schematic Plan for the multi -use auditorium upgrades, kitchen renovations, and men's and women's restroom renovations, RRM will provide a labeled floor plan and preliminary code analysis.

Construction Cost Projection
Based on the draft schematic package, RRM's construction cost estimator will prepare a construction cost projection for all the site elements. The cost projection will be itemized following CSI format with supporting item descriptions and unit costs.
22 City of Bell Gardens I Proposal for
Design, Architecture and Engineering Services for The Veterans Park Refurbishment andRestroomr Page 171 of 797

Deliverables:
• One (1) park colored draft schematic plan layout
• One (1) Ross Hall labeled draft schematic plan
• One (1) Preliminary Code Analysis
• One (1) construction cost projection
Subtask 2.03: Key Stakeholder Meetings
RRM will host virtual individual and group meetings with key stakeholders. The purpose of these meetings is to provide further input and insight into key design amenities and features. Every reasonable effort will be made to meet with stakeholders unable to attend, at a later time, while maintaining the project schedule. City staff will be responsible for identifying and scheduling the stakeholder group. The list of potential stakeholders will be discussed at the project kickoff meeting, but may include City maintenance staff, recreational groups, Suva Intermediate School, Bell Gardens Boys and Girls Club, and neighbors of the project.

Deliverables:
• Three (3) virtual stakeholder meetings held via Microsoft Teams or Zoom • Summarizing memorandum
Subtask 2.04: Final Schematic Plan
Based on the feedback received from City staff and the key stakeholders, RRM will then update the draft schematic plan to the final schernatic plan level for City review. RRM's team will "polish" the design elements detailed in the draft schernatic plan package to create the final rendered and labeled plan graphic, fully illustrating the entire park's renovation. Additionally, RRM will update the labeled floor plan and preliminary code analysis for Ross Hall based on feedback received. The finalized schematic plan will then be assessed by RRM's construction cost estimator to make adjustments to the draft estimate. The rendered and labeled plan will be posted on the city website.

Deliverables:
• One (1) final color rendered and annotated final schematic plan • One (1) Ross Hall labeled final schematic plan
• One (1) Preliminary Code Analysis
• One (1) construction cost projection
Subtask 2.04: Final Schematic Plan
Based on the feedback received from City staff and the key stakeholders, RRM will then update the draft schematic plan to the final schematic plan level for City review. RRM's team will "polish" the design elements detailed in the draft schematic plan package to create the final rendered and labeled plan graphic, fully illustrating the entire park's renovation. Additionally, RRM will update the labeled floor plan and preliminary code analysis for Ross Hall based on feedback received. The finalized schematic plan will then be assessed by RRM's construction cost estimator to make adjustments to the draft estimate. The rendered and labeled plan will be posted on the city website.

Deliverables:
• One (1) final color rendered and annotated final schematic plan • One (1) Ross Hall labeled final schematic plan
• One (1) Preliminary Code Analysis
• One (1) construction cost projection
Methodology I Sectionl 23

Page 172 of 797 ends

Subtask 2.05: 30% Design Development & Phasing Plan
RRM will prepare a draft 30% design development plan that refines the Final Schematic Plan for the park and Ross Hall improvements. The plan will utilize information from the City and data obtained from the topographic survey and will indicate hardscape layout, site furnishings, shade structures and sails, court resurfacing, planting areas, lighting locations, stormwater BMPs, irrigation hydrozones, and the irrigation mainline location. For Ross Hall, expanding from the final schematic, the 30% Design Development Plan will include a Ross Hall demolition plan, floor plan, interior finish plan, interior elevations, and a materials board. The plan will be used to develop one (1) preliminary cost estimate and to confirm the improvements.

Additionally, RRM will provide one (1) phasing plan for discussions with the city about future construction of the improvements.

Deliverables:
• 30% Draft Design Development Plan Set:
• One (1) Labeled Layout Plan
▪ One (1) Conceptual Planting Plan and Plant Palette
• One (1) Irrigation Hydrozone & Mainline Layout Plan
• One (1) Park Materials Board
• One (1) Ross Hall Demolition Plan
• One (1) Ross Hall Floor Plan
• One (1) Ross Hall Interior Finish Plan
• One (1) Ross Hall Interior Elevations Sheet
• One (1) Ross Hall Interior Materials Board
• One (1) phasing plan
• One (1) construction cost projection
..oi, t;uctbn%,„fL..r.

Subtask 3.01: 65% Draft Construction Documents
RRM's team will prepare 65% Construction Documents that address plan check comments generated from the City's review of the 30% Design Development submittal. Prior to submitting to the City, comments generated from RRM's QA/QC review tearn will be incorporated into the 65% construction document package. The 65% Construction Documents will be submitted to the City's Project Manager for distribution and plan -check.

Deliverables:
• One (1) PDF file 65% Draft Construction Document package • One (1) construction cost opinion
• 30% response to comments memo
Subtask 3.02: 90% Draft Construction Documents
RRM's team will prepare 90% Construction Documents that address plan check comments generated from the City's review of the 65% Construction Document submittal. The 90% Construction Documents will be submitted to the City's Project Manager for distribution and backcheck.

Deliverables:
• One (1) PDF file 90% Construction Document package
• One (1) construction cost opinion
• 65% response to comments memo
24 City of Bell Gardens fns 1
Design, Architecture and Engineering Services for The Veterans Park Refurbishment and Restroom I Page 173 of 797

Subtask 3.03:100% Draft Construction Documents
RRM's team will prepare 100% Construction Documents that address plan check comments generated from the City's review of the 90% Construction Document submittal. The 100% Construction Documents will be submitted to the City's Project Manager for distribution and backcheck.

Deliverables:
• One (1) PDF file 100% Construction Document package
• One (1) construction cost opinion
• 90% response to comments memo
Subtask 3.04: Permit Processing Assistance
RRM's team will work with the City project management team to process the improvement plans through the City's departments for plan check and permitting. The City will review and compile all agency comments into one set of comments for RRM to respond to. It is assumed that the City will resolve any conflicting comments prior to submitting to RRM. This scope assumes the following City permits will be required:
• Building and Safety Permit —Community Development Department • LA County Department of Public Health
• Golden/ Liberty Water District
• LA Fire Department
• Air Quality Management District
• Sanitation District
• LA County Waste Management
Deliverables:
• Prepare one (1) design package and submit to seven (7) permitting agencies with one (1) round of response to comments per agency
Subtask 3.05: Bid -Ready Construction Documents
RRM's team will prepare the Bid -Ready Construction Documents to address any backcheck comments generated from the City's review of the 100% Construction Document submittal. Once the final revisions are complete, one (1) signed reproducible Bid -Ready set of Construction Documents will be submitted to the City's Project Manager for final City/agency signatures and bidding.

Deliverables:
• One (1) signed reproducible Bid -Ready Construction Document package Subtask 3.06: LID Standard Manual Compliance Report
RRM will prepare a LID Standards Manual Compliance Report based on Los Angeles County's 2014 LID Standards Manual. The LID report will be developed to take advantage of any proposed site improvements to utilize low impact techniques to provide water quality treatment. Where possible, source control techniques will be proposed, low maintenance and simple solutions will be sought over proprietary BMP when possible.

The LID report will be submitted to the city for review. It will quantify and describe the Post Construction BMPs to be used in the project. Based on the City's comments, RRM will revise the LID Report. A project plan will be included, illustrating the project site, Drainage Management Areas (DMA's), and the location of BMPs.

Operations and maintenance procedures will be defined.

Deliverables:
• One (1) draft LID report
• One (1) final LID report
Methodology Section 1
25

Page 174 of 797 ends

Subtask 4,01: Bidding Support
RRM will assist the City during the bidding phase of the project. RRM will attend one (1) pre -bid conference job walk, respond to Requests for Clarifications (RFC) as determined by the City to be reasonable or necessary for the bidding process. Bidder questions will be received and sorted by the City, with applicable questions forwarded in writing to RRM's team for response back to the City in writing.

Deliverables:
• Prepare for and attend one (1) pre -bid conference job walk • Plan clarification response documents
Subtask 4.02: Construction Administration Support
RRM's team will support the City during the anticipated 365 -calendar day (12 -month) construction duration.

RRM will attend one pre -construction conference and review and respond to Requests for Information (RFI), Change Orders (CO), submittals, and contractor -supplied shop drawings. Under this task, RRM will also prepare and issue Supplemental Instructions as necessary to clarify design intent. RRM will also coordinate with City staff as necessary. We assume the City's project manager will filter and respond to straightforward RFIs directly to the contractor.

Deliverables:
• Prepare for and attend one (1) pre -construction conference • RFI, CO, submittal reviews, shop drawings responses, supplemental instructions, and general record - keeping documents
Subtask 4.03: Construction Meetings and Observation
RRM's Project Manager will prepare for and attend up to seven (7) field observation meetings throughout the anticipated 365 -calendar day (12 rnonth) construction period to observe construction progress.

These site visits and observations are not intended to be an exhaustive check or a detailed inspection of the Contractor's work, but rather are to allow RRM to become generally familiar with the work in progress and to determine, in general, if the work is proceeding in accordance with the contract documents. RRM's design team shall not supervise, direct, or have control over the Contractor's work, nor have any responsibility for the construction means, methods, techniques, sequences, or procedures selected by the Contractor, nor for the Contractor's safety precautions or programs in connection with the work. These rights and responsibilities are solely those of the Contractor in accordance with the contract documents. Furthermore, the Contractor shall be responsible for notifying RRM in a timely manner to schedule these field observation meetings.

RRM's team shall not be responsible for any acts or omissions of the Contractor, Subcontractor, any entity performing any portion of the work, or any agents or employees of any of them. RRM does not guarantee the performance of the contractor and shall not be responsible for the Contractor's failure to perform work in accordance with the contract documents or any applicable laws, codes, rules, or regulations. Due to the indeterminate nature of the construction observation requests, this task includes budget for meeting quantity stated above. If more construction observation requests are received, they are to be authorized by the City as additional work.

Deliverables:
• Prepare for and attend seven (7) construction observation meetings (final observation to include a preliminary punch list)
• Field notes and photo documentation
26 City of Bell Gardens } Proposal for
Design, Architecture and Engineering Services for The Veterans Park Refurbishment and Restroom Renovation

Page 175 of 797 ends

Subtask 4.04: Record Drawings
Upon completion of construction work, RRM will compile and deliver to the City a reproducible set of record drawings based upon the marked -up as -built drawings, addenda, change orders, and other data furnished by the Contractor. These record drawings will show significant changes made during construction. RRM will provide record drawings in PDF format. Revised CAD drawings are excluded from this exercise. Because these record drawings are based on unverified information provided by a third -party, which RRM shall assume will be reliable, RRM cannot and does not warrant their accuracy. RRM will develop a "composite utility map" PDF markup of all utilities for the City's reference and convenience.

Deliverables:
• One (1) reproducible PDF set of record drawings based on contractor provided as-builts Subtask 5.01: Project Coordination and Management
RRM's project manager will coordinate with City and design staff, utility companies, resource agencies, sub - consultants, and other agencies as necessary on an on -going basis throughout the project's lifecycle. This task also includes project schedule creation and maintenance as tasks are completed, document review, and day- to-day project coordination efforts including general correspondence and telephone conferencing as required to support City staff during the project's development.

Deliverables:
• Memos, meeting minutes, and general correspondence for document control, compiled in electronic file form
• Project schedule creation and maintenance
Subtask 5.02: Project Development Team (PDT) Meetings
RRM's project manager, and appropriate team member(s) as the subject matter dictates, will prepare for and attend up to eight (8) virtual PDT meetings with the Client team through the duration of the project. These meetings will provide an opportunity to collectively review, discuss, and clarify any design issues so that work may proceed in an efficient manner, and to plan out the community meetings.

Deliverables:
• Prepare for and facilitate up to eight (8) virtual PDT meetings • Prepare and distribute meeting notes
Subtask 5.03: QA/QC Review
At the 65%, 90%, and 100% construction document milestones, RRM will conduct an internal QA/QC review.

RRM assigns an in-house QA/QC manager who is not a part of the design team. Using RRM's QA/QC checklist, a QA/QC team that is not part of the design team will review the project to ensure disciplines are fully coordinated, key information is included, references point to the correct location, and specifications tied into the drawings. This review, and corrective measures, will occur prior to each package (65%, 90% & 100%) being submitted to the City.

Deliverables:
• QA/QC review comments incorporated into the 100% Draft Construction Document package Methodology I Section 1 27

Page 176 of 797 ends

Subtask 6.01: Schematic Renderings
To help illustrate the draft schematic plan and convey the design intent, RRM will prepare three (3) perspective graphics that evoke the vision and character of key areas within the park based on the Final Schematic Plan. The perspective graphics will be colored and labeled for use in meetings and posting on the city website.

Deliverables:
• Three (3) perspective graphics of key areas within the site Subtask 6.02: Supplemental Survey
As the Project moves from the schematic level to the 65% level, the engineering team will pick up any additional survey data capture mark outs as requested by the design team, which is typically focused on additional tie in horizontal and vertical control points to complete the engineering design. Supplemental data will be incorporated into the Project base file.

Deliverables:
• Supplemental field survey data in AutoCAD format
Subtask 6.03: Public Hearing Study Session - Draft Schematic Plan RRM will work with City staff to prepare for and facilitate a public hearing study session with to review the Draft Schematic Plan. The goal is to share the concepts key features so participants can comment and provide input. RRM will develop a power point, and/or other presentation support media/graphics as determined appropriate by the City/RRM team.

Deliverables:
• Present the Draft Schematic Plan for agency department feedback. • Support media and graphics
Subtask 6.04: Stormwater Pollution Prevention Plan (SWPPP) RRM Civil Engineering will prepare plans for temporary erosion control facilities. Temporary facilities will be proposed for the protection of graded areas and drainage devices. Details and appropriate notes for best management practices (BMP) and guidelines for implementation are proposed to be in conformance with the State of California Water Resources Board requirements and the approved staff report, including sediment control recommendations. The temporary erosion control plans will be incorporated into the project improvement plans, as well as into the project SWPPP. This task will include preparation of a "notice of intent" application to be filed with the State and an SWPPP report to be utilized for construction. The SWPPP report will outline various procedures and methods for monitoring and will implement an SWPPP during construction of the project. This task does not include construction monitoring or SWPPP updates during construction.

Deliverables:
• One (1) completed "notice of intent" application for stormwater discharge and one (1) SWPPP report for upload to the SMARTS system with SWCtCB
i1t d o n s
• Existing electrical infrastructure is adequately sized to accommodate the revised design loads. No changes to the existing electrical system (panels, transformers, main distribution) are required. • Existing water pressure is adequate.
• EV charging station design is not required.
• Natural gas is not required for the design.
• RRM can coordinate with the City -contracted arborist regarding work adjacent to large existing trees ?_8 City of Bell Gardens Proposal for j'
Design, Architecture and Engineering Services for The Veterans Park Refurbishment and Restroom Page 177 of 797

• City will provide access to all areas for the site assessment visit. This includes access to mechanical, plumbing, and electrical equipment.
• One contact person who will serve as the City's representative and will consolidate all Agency review comments for each submittal milestone into one (1) list of official comments to which RRM can respond • City will provide list of project stakeholders and scheduled times for meetings • City will coordinate building department review and agency compliance at 90% CD Submittal • Document distribution for technical reviews, bidding, and construction • City will provide bid and contract "boilerplate" documents, such as invitation, instructions, general and special conditions, contract forms, insurance, forms, etc. • City will commission a Landscape Irrigation Audit Report, performed by a third -party professional separate from RRM, in accordance with the State's Model Water Efficient Landscape Ordinance. • City will provide title reports for the park property. • City will provide record drawings for analysis for the building and site, including MEP systems. uFcope
Please note that the tasks to be performed by the RRM team are limited to those outlined above. This scope of services excludes the following:
• Independent verification of the accuracy of City provided information • Public outreach
• Presentations to City Council
• Independent verification of accuracy of City -provided information • Green building programs (e.g. LEED, Sites, Greenpoint) • Arborist Report
• Environmental, Cultural, and Biological services
• Irrigation system audit
• Off -site utility analysis
• Repair to utilities encountered during geotechnical investigations not marked by Underground Service Alert (USA) or shown on plans provided by the City.
• Payment of fees (e.g., title report, permit, processing, noticing, plan check, etc.) • Design of specialized foundation/structural systems other than conventional slab on grade and spread footings
• Easement/dedication/annexation exhibits
• Facade renovations for the buildings on -site
• Interior building renovations for buildings other than Ross Hall • Lighting improvements for baseball fields, volleyball courts, and memorial • Existing electrical infrastructure is adequately sized to accommodate the revised design loads. No changes to the existing electrical system (panels, transformers, main distribution) are required. • Existing infrastructure for plumbing systems and water pressure is adequate and revisions are not required.
• Splash pad design, mechanical heating and A/C system, Fire alarm, telecommunication, solar panel, security system, and electric vehicle charging system and infrastructure design and coordination is not included as a part of this scope, but can be provided as an additional service. • Value Engineering (mechanical, plumbing and electrical services) • Preparation of separate bid packages and alternates (mechanical, plumbing, and electrical services) • Work associated with systems or components outside the work area is not included except if the system serves the area of work.

Any additional services that RRM Design Group is asked to perform over and above the tasks described above will be subject to a subsequent contract amendment.

Methodology Section 1
29

Page 178 of 797 ends

Title and Reference Sheets
RRM's team will prepare title sheets, as necessary, to convey pertinent general project information. These sheets may include the project name, location, approval blocks, agency contact information, USA alert, basis of survey statement, list of abbreviations, and bid alternate instructions.

Demolition Plans
RRM's team will prepare demolition plans, at an appropriate scale, for structures and elements requiring removal to implement the park's design. The plans will locate, identify, and describe the removal items and provide instructions for the safe disposal of the demolished work. Additionally, the plans will indicate items to salvage or stockpile such as topsoil for later use in the planting area construction.

Erosion Control Plan
RRM's team will prepare Erosion Control Plans for the site depicting proposed construction BMP in conformance with the State Construction General Permit. The plans will include plan views with locations of proposed BMP, and details of the BMP.

Construction Keynote Plans
RRM's team will prepare construction keynote plans, at an appropriate scale, for the approved design. The plans will present the overall park design layout with a keynoting system that identifies construction items, references to appropriate details, and drawing series directions.

Site Construction Details
As a companion to the construction plans, we will prepare details for the construction items illustrated on the site construction plans. The details will specify materials, dimensions, colors, and finishes.

Horizontal Control Plans
RRM will prepare horizontal control plans, at an appropriate scale, for the approved design. The plans will establish all horizontal control for the Project. The plans will also establish construction layout control points and establish a coordinate system for locating all site elements.

Grading and Drainage Plans
RRM's team will prepare grading and drainage plans, at an appropriate scale, for the approved design based on the topographic survey. The plans will build on the boundary and topographic information and will show all vertical control of the project elements, contour grading, spot elevations, and cut and fill estimates within the project site. ifihe plans will detail drainage facilities within the park development area with supporting calculations performed for the sizing of new on -site pipes and inlets as outlined in the above task.

Site Utilities
RRM will prepare plan construction documents for domestic water service, fire water and sanitary sewer, storm drains (e.g., "wet" utilities) contained within the property, and connection to the main infrastructure as applicable. Water, sewer, and storm drain plans will include vertical and horizontal design information. RRM assumes adequate service and capacity for the wet utilities. Electrical and gas are not included in this plan sheet (see site electrical below).

Ross HaII Plans and Details
RRM's architecture team will provide architecture plans, fixture and materials schedules, and details, at an appropriate scale for the renovation of the kitchen, auditorium and stage support rooms, and restrooms for Ross Hall. Improvements in these areas within Ross Hall will be brought to current accessible design standards, 30 City of Bell Gardens I Proposal for fib
Design, Architecture and Engineering Services for The Veterans Park Refurbishment and Restrooml Page 179 of 797

Mechanical Plans and Details
RRM's team will prepare mechanical plans that show airflow calculations and drawings for the renovated Ross Hall which include new exhaust hood and fans in the kitchen and restrooms. Mechanical details and equipment will be included. Existing building systems will be integrated into existing control systems if available.

Plumbing Plans and Details
RRM's team will verify the adequacy of existing systems using plumbing load calculations for domestic water and waste. Drawings will provide ADA compliant fixture and equipment selections, plumbing renovation plans with fixture locations, and sewer and vent connections, and riser diagrams with associated fixture unit valves for water and waste. Plumbing details and schedules will also be included.

Site Electrical Plans and Details
RRM's subconsultant, P2S, will prepare site electrical plans using documented electrical equipment and services, develop electrical distribution system and prepare electrical single -line diagrams. The plans will include the following upgrades for Ross Hall: LED lighting, occupancy sensors, outlets, power and furnish electric stove, oven, hood, microwave, commercial grade refrigerator and freezer, ice maker, food warmer, dedicated circuits, exhaust fans, and power for mechanical equipment. For the exterior park improvements, P2S will provide outlets at the stage, the irrigation controller, and LED lighting at the sports courts.

Electric and gas utility trench locations will be shown schematically based on coordination with a specialty sub -consultant and/or utility service provider. The plans shall be subject to final utility company handout drawings (prepared by others as deferred submittals). We assume adequate service for this project is available directly adjacent to the project frontage.

Irrigation Plans and Details
RRM will prepare irrigation plans, calculations and document package for planting areas in compliance with the State's Model Water Efficient Landscape Ordinance MWELO. The plans will detail such things as the irrigation system layout, main line, automatic weather sensing controller, head layout, piping, filter, and backflow device. In support of the irrigation plans, we will prepare irrigation details that specify the method of construction and proper irrigation system component procedures. Water use calculations will be provided in accordance with MWELO standards.

Planting Plans and Details
RRM's team will prepare planting plans for planting areas. The plans will show the layout of planting indicating plant species, quantity, size and location of all shrubs, ground cover and trees. The plans will indicate anticipated water use for each plant material and separate the planting areas into distinct hydrozone areas for efficient watering. In support of the planting plans, we will prepare planting details that specify the method of construction and proper planting procedures.

Specifications
RRM's team will prepare technical specifications (CSI Division 02 through 48 as applicable). This scope assumes the City will prepare all Division 00 and 01 general provision specification sections related to this project and assemble the specifications book.

Construction Cost Opinions
RRM's construction cost estimator will estimate construction costs at the 65%, 90% and 100% submittal levels. The detailed Construction Cost Opinion will be
itemized with supporting item descriptions and unit
costs. Due to many variables surrounding bidding and
construction conditions, this opinion will not represent a guarantee that bids received, or actual costs of
construction will be equal to the opinion.

Methodology I Sectionl 31

Page 180 of 797 ends

RRM Project Pictured: San Lorenzo Community Park - Playground Restroom, San Lorenzo, CA Exhibit "A" Scope of Services
32 City of Bell Gardens I Proposal for 01
Design, Architecture and Engineering Services for The Veterans Park Refurbishment and Restroom I Page 181 of 797

vation
Restroom
Task 1: Project Initiation and Feasibility Phase
Subtask 1.01: Utility Mapping/Utility Coordination
Subtask 1.02: Geotechnical Investigation
Task 2: Design Development Services
Subtask 2.01:

Subtask 2.02:

Subtask 2.03:

Subtask 2.04:

Subtask 2.05:

Preliminary Layout Plan & Client Confirmation Meeting
Draft Schematic Design Package
Final Schematic Design Package
50% Design Development Package
100% Design Development Package
Task 3: Construction Document Services
Subtask 3.01:

Subtask 3.02:

Subtask 3.03:

Subtask 3.04:

Subtask 3.05:
65% Draft Construction Documents Package
90% Draft Construction Documents Package
100% Draft Construction Documents Package
Permit Processing Assistance
Bid -Ready Construction Documents Package
Task 4: Construction Support Services
Subtask 4.01: Bidding Support
Subtask 4.02: Construction Administration Support
Subtask 4.03: Construction Observation
Subtask 4.04: Record Drawings
Task 5: Project Coordination Services
Subtask 5.01:

Subtask 5.02:

Subtask 5.03:

Project Coordination & Management
Project Development Team Meetings
QA/QC Review
Task 6: Optional Services
Subtask 6.01: Public Hearing Study Session — Draft Schematic Plan Methodology I Sectionl 53

Page 182 of 797 ends

RRM Project Pictured: Kings County Rural Transit New Facility -Interior Restrooms, Kings County Area, CA Subtask 1.01: Utility Mapping/Utility Coordination
RRM's utility consultant, Certerra Subsurface — Cbelow, will conduct a comprehensive utility investigation of Veteran's Park to determine all utilities that run through the park. Certerra will exhaust all utility locating methods to identify the horizontal and vertical locations of utility lines, including reviewing existing as - built mapping and on -site reconnaissance field walk. Equipment used during the investigation will include electromagnetic locator, locatable CCTV push camera, ground penetrating radar, locatable duct rodder, crawler camera and lateral launch equipment. Certerra will provide utility locations along with depth estimates in the field.

Once the data has been collected, Certerra will provide a comprehensive two-dimensional utility map in AutoCAD and PDF to be added to the base map.

Deliverables:
• Utility location markers and depth estimates on the park site • AutoCAD and PDF file of utility locations
Subtask 1.02: Geotechnical Investigation
RRM's Geotechnical consultant, GPI, will prepare a geotechnical investigation report suitable for support of schematic planning and construction documents for Veterans Park in Bell Gardens. This will include review of readily available background materials and data including published geologic and seismic hazard maps, groundwater data, topographic maps, and geotechnical data. A site reconnaissance will be conducted to document the surficial geological conditions on site and mark proposed locations for clearance by site personnel and Underground Service Alert (USA).

Subsurface exploration will be accomplished through 8 exploratory borings drilled to depths of 5 to 50 feet (3 at 5 feet, 4 at 10 feet, and 1 at 50 feet) below the existing grade. Two infiltration test wells will also be installed to depths of 5 to 10 feet at locations requested by the Project Civil Engineer. The borings will be drilled with a track -mounted drill rig or hand -auger equipment and will be logged by our Engineer. Relatively undisturbed and bulk samples will be obtained at selected intervals from the borings. The soil samples will be transported to our City of Los Angeles and DSA approved laboratory for testing. In accordance with County of Los Angeles requirements, borings deeper than 10 feet will require a well permit and be backfilled with grout, The geotechnical evaluation results will be compiled in a report providing findings, conclusions, and geotechnical recommendations for design and construction of improvements.

A geotechnical investigation report will be prepared illustrating the locations of borings, boring logs, and presenting laboratory analysis results. The report will include a general discussion of and geotechnical design 34 City of Bell Gardens Proposal for
Design, Architecture and Engineering Services for The Veterans Park Refurbishment and Restroom Renovation

Page 183 of 797 ends

recommendations for the structures planned (splash pad and associated support buildings and tanks, minor buildings, stage, light standards, retaining walls, fence/pole foundations, hardscape, and pavements). We will also include a conclusion on the suitability of the site for the proposed construction from a geotechnical perspective, description of geology and soils, seismic hazards, mitigations alternatives as appropriate, depth of groundwater, and infiltration rates.

Deliverables:
• Geotechnical Investigation Report
\ (opn „gin
Subtask 2.01: Preliminary Layout Plan & Client Confirmation Meeting RRM will develop one (1) preliminary layout plan of the park restroom and storage facility building based on the City's requirements for the building. This plan will be drafted and labeled, This plan will then be refined in virtual consultation with City Staff at a confirmation meeting.

Deliverables:
• One (1) park restroom and storage facility preliminary layout plan Subtask 2.02: Draft Schematic Design Package
RRM will develop a draft schematic plan prepared at a level for presentation to the City staff. The draft schematic plan will include one (1) floor plan layout based on the program confirmation meeting results.

Based on the final floor plan layout, up to two (2) interior elevations, up to two (2) building sections, and four (4) exterior elevations will be developed showing materials, roof profiles, building style, and colors for the restroom and storage building. Based on the schematic design package, RRM's construction cost estimator will prepare a preliminary order of magnconstruction cost projection for preferred design.

Additionally, RRM will work with the City to develop two exterior perspective renderings of the restroom and storage facility. The renderings can be used for a variety of purposes including on the City website.

Deliverables:
= One (1) park restroom and storage building floor plan • Two (2) interior elevations
• Two (2) building sections
• Four (4) exterior elevations (one in each cardinal direction) • One (1) preliminary construction cost opinion
• Two (2) colored perspective renderings
Subtask 2.03: Final Schematic Design Package
Based on the feedback received from City staff, RRM will then update the draft schematic plan to the final schematic plan level for City review. RRM's team will "polish" the design elements detailed in the draft schematic plan package to create the final Schematic Design Package for the park restroom and storage building. Building on the Draft Schematic Plan cost estimate, RRM's construction cost estimator will revise the draft cost estimate to reflect refinements made to the final schematic design.

Deliverables:
• One (1) park restroom and storage building floor plan • Two (2) interior elevations
• Two (2) building sections
+ Four (4) exterior elevations (one in each cardinal direction) • One (1) preliminary construction cost opinion
• Two (2) colored perspective renderings
Methodology Section 1 35

Page 184 of 797 ends

Subtask 2.04: 50% Design Development Package
RRM will prepare a draft 50% design development plan that refines the Final Schematic Plan for Veterans Park Restroom and Storage Facility building. The plan will utilize information from the City and will indicate demolition plan, floor plan, interior and exterior finish plan, interior and exterior elevations, and a materials board. The plan will be used to develop one (1) preliminary design development cost estimate.

Deliverables:
• 50% Draft Design Development Plan Set:
• One (1) Demolition Plan
▪ One (1) Floor Plan
• One (1) Interior Finish Plan
• One (1) Exterior Finish Plan
O One (1) Interior Elevations Sheet
• One (1) Exterior Elevations Sheet
O One (1) Interior Materials Board
• One (1) Construction Cost Projection
Subtask 2.05: 100% Design Development Package
RRM will prepare a draft 50% design development plan that refines the Final Schematic Plan for Veterans Park Restroom and Storage Facility building. The plan will utilize information from the City and will indicate demolition plan, floor plan, interior and exterior finish plan, interior and exterior elevations, and a materials board. The plan will be used to develop one (1) preliminary design development cost estimate.

Deliverables:
• 100% Draft Design Development Plan Set:
• One (1) Demolition Plan
? a One (1) Floor Plan
• One (1) Preliminary Structural Plan Layout
• One (1) Interior Finish Plan
O One (1) Exterior Finish Plan
One (1) Interior Elevations Sheet
• One (1) Exterior Elevations Sheet
• One (1) Interior Materials Board
• One (1) Construction Cost Projection
Subtask 3.01: 65% Draft Construction Documents Package
RRM's team will prepare 65% Construction Documents that address plan check comments generated from the City's review of the 30% Design Development submittal. Prior to submitting to the City, comments generated from RRM's QA/QC review team will be incorporated into the 65% construction document package. The 65% Construction Documents will be submitted to the City's Project Manager for distribution and plan -check.

Deliverables:
• One (1) PDF file 65% Draft Construction Document package • One (1) construction cost opinion
• 30% response to comments memo
Subtask 3.02: 90% Draft Construction Documents Package
RRM's team will prepare 90% Construction Documents that address plan check comments generated from the City's review of the 65% Construction Document submittal. The 90% Construction Documents will be submitted to the City's Project Manager for distribution and backcheck.

City of Bell Gardens I Proposal for
Design, Architecture and Engineering Services for The Veterans Park Refurbishment and Restroom Page 185 of 797

Deliverables:
• One (1) PDF file 90% Construction Document package
• One (1) construction cost opinion
• 65% response to comments memo
Subtask 3.03: 100% Draft Construction Documents Package RRM's team will prepare 100% Construction Documents that address plan check comments generated from the City's review of the 90% Construction Document submittal. The 100% Construction Documents will be submitted to the City's Project Manager for distribution and backcheck.

Deliverables:
• One (1) PDF file 100% Construction Document package
• One (1) construction cost opinion
I • 90% response to comments memo
Subtask 3.04: Permit Processing Assistance
RRM's team will work with the City project management team to process the improvement plans through the City's departments for plan check and permitting. The City will review and compile all agency comments into one set of comments for RRM to respond to. It is assumed that the City will resolve any conflicting comments prior to submitting to RRM. This scope assumes the following City permits will be required:
• Building and Safety Permit — Community Development Department • LA County Department of Public Health
• Golden/ Liberty Water District
• LA Fire Department
• Air Quality Management District
• Sanitation District
• LA County Waste Management
Deliverables:
• Prepare one (1) design package and submit to seven (7) permitting agencies with one (1) round of response to comments per agency
Subtask 3.05: Bid -Ready Construction Documents Package RRM's team will prepare the Bid -Ready Construction Documents to address any backcheck comments generated from the City's review of the 100% Construction Document submittal. Once the final revisions are complete, one (1) signed reproducible Bid -Ready set of Construction Documents will be submitted to the City's Project Manager for final City/agency signatures and bidding.

Deliverables:
• One (1) signed reproducible Bid -Ready Construction Document package Ih
S e tv<<
Subtask 4.01: Bidding Support
RRM will assist the City during the bidding phase of the project. RRM will attend one (1) pre -bid conference job walk, respond to Requests for Clarifications (RFC) as determined by the City to be reasonable or necessary for the bidding process. Bidder questions will be received and sorted by the City, with applicable questions forwarded in writing to RRM's team for response back to the City in writing.

Deliverables:
• Prepare for and attend one (1) pre -bid conference job walk • Plan clarification response documents
Methodology I Section 1 37

Page 186 of 797 ends

Subtask 4.02: Construction Support
RRM's team will support the City during the anticipated 180 -calendar day (6 -month) construction period construction process. RRM will attend one pre -construction conference and review and respond to Requests for Information (RFI), Change Orders (CO), submittals, and contractor -supplied shop drawings and rough grading survey. Under this task, RRM will also prepare and issue Supplemental Instructions as necessary to clarify technical details and prepare preliminary and final punch lists. RRM will also coordinate with City staff as necessary. We assume the City's project manager will filter and respond to straightforward RFIs directly to the contractor.

Deliverables:
• Prepare for and attend one (1) pre -construction conference • RFI, CO, submittal reviews, shop drawings responses, supplemental instructions, and general record - keeping documents
Subtask 4.03: Construction Observation
RRM's Project Architect will prepare for and attend up to seven (7) field observation meetings throughout the anticipated 180 -calendar day (6 -month) construction period to observe construction progress.

These site visits and observations are not intended to be an exhaustive check or a detailed inspection of the Contractor's work, but rather are to allow RRM to become generally familiar with the work in progress and to determine, in general, if the work is proceeding in accordance with the contract documents. RRM's design team shall not supervise, direct, or have control over the Contractor's work, nor have any responsibility for the construction means, methods, techniques, sequences, or procedures selected by the Contractor, nor for the Contractor's safety precautions or programs in connection with the work. These rights and responsibilities are solely those of the Contractor in accordance with the contract documents. Furthermore, the Contractor shall be responsible for notifying RRM in a timely manner to schedule these field observation meetings.

RRM's team shall not be responsible for any acts or omissions of the Contractor, Subcontractor, any entity performing any portion of the work, or any agents or employees of any of them. RRM does not guarantee the performance of the contractor and shall not be responsible for the Contractor's failure to perform work in accordance with the contract documents or any applicable laws, codes, rules, or regulations. Due to the indeterminate nature of the construction observation requests, this task includes budget for meeting quantity stated above. If more construction observation requests are received, they are to be authorized by the City as additional work.

Deliverables:
• Prepare for and attend seven (7) construction observation meetings (final observation to include a preliminary punch list)
• Field notes and photo documentation
Subtask 4.04: Record Drawings
Upon completion of construction work, RRM will compile and deliver to the City a reproducible set of record drawings based upon the marked -up as -built drawings, addenda, change orders, and other data furnished by the Contractor. These record drawings will show significant changes made during construction. RRM will provide record drawings in PDF format. Revised CAD drawings are excluded from this exercise. Because these record drawings are based on unverified information provided by a third -party, which RRM shall assume will be reliable, RRM cannot and does not warrant their accuracy. RRM will develop a "composite utility map" PDF markup of all utilities for the City's reference and convenience.

Deliverables:
• One (1) reproducible PDF set of record drawings based on contractor provided as-builts 38 City of Bell Gardens I Proposal for
Design, Architecture and Engineering Services for The Veterans Park Refurbishment and RestroomF Page 187 of 797

Subtask 5.01: Project Coordination and Management
RRM's project manager will coordinate with City and design staff, utility companies, resource agencies, sub - consultants, and other agencies as necessary on an on -going basis throughout the project's lifecycle. This task also includes project schedule creation and maintenance as tasks are completed, document review, and day- to-day project coordination efforts including general correspondence and telephone conferencing as required to support City staff during the Project's development.

Deliverables:
• Memos, meeting minutes, and general correspondence for document control, compiled in electronic file form
• Project schedule creation and maintenance
Subtask 5.02: Project Development Team (PDT) Meetings
RRM's project manager, and appropriate team member(s) as the subject matter dictates, will prepare for and attend up to eight (8) virtual PDT meetings with the Client team through the duration of the project. These meetings will provide an opportunity to collectively review, discuss, and clarify any design issues so that work may proceed in an efficient manner, and to plan out the community meetings.

Deliverables:
• Prepare for and facilitate up to eight (8) virtual PDT meetings • Prepare and distribute meeting notes
Subtask 5.03: QA/QC Review
At 100% construction document milestone, RRM will conduct an internal QA/QC review. RRM assigns an in-house QA/QC manager who is not a part of the design team. Using RRM's QA/QC checklist, a QA/QC team that is not part of the design team will review the project to ensure disciplines are fully coordinated, key information is included, references point to the correct location, and specifications tied into the drawings. This review, and corrective measures, will occur prior to the 100% package being submitted to the City.

Deliverables:
• QA/QC review comments incorporated into the 65% Draft Construction Document package • QA/QC review comments incorporated into the 90% Draft Construction Document package • QA/QC review comments incorporated into the 100% Draft Construction Document package Subtask 6.01: Public Hearings
RRM will work with City staff to prepare for and facilitate a public hearing study session with to review the Draft Schematic Plan. The goal is to share the concepts key features so participants can comment and provide input. RRM will develop a power point, and/or other presentation support media/graphics as determined appropriate by the City/RRM team.

Deliverables:
• Present the draft schematic plan at a public hearing for feedback • Support media and graphics
Methodology I Section 1 39

Page 188 of 797 ends

• Existing electrical infrastructure is adequately sized to accommodate the revised design loads. No changes to the existing electrical system (panels, transformers, main distribution) are required. • Existing water pressure is adequate.
• Natural gas is not required for the design.
. ° lent
sibhities
• City will provide access to all areas for the site assessment visit. This includes access to mechanical, plumbing, and electrical equipment.
• One contact person who will serve as the City's representative and will consolidate all Agency review comments for each submittal milestone into one (1) list of official comments to which RRM can respond • Document distribution for technical reviews, bidding, and construction • City will coordinate building department review and agency compliance at 90% CD Submittal • City will provide bid and contract "boilerplate" documents, such as invitation, instructions, general and special conditions, contract forms, insurance, forms, etc. • City will commission a Landscape Irrigation Audit Report, performed by a third -party professional separate from RRM; in accordance with the State's Model Water Efficient Landscape Ordinance. • City will provide title reports for the park property. • City will provide record drawings for analysis for the building and site, including MEP systems. �^p� h p t g b ��S . Limitations S 3�.n �,,,r „ad' .., h .., �. Vim,# E x 0:,,.� a K.a �:. f F s Please note that the tasks to be performed by the RRM team are limited to those outlined above. This scope of services excludes the following:
• Independent verification of the accuracy of City provided information • Public outreach workshop and strategy
• Presentations to City Council
• Independent verification of accuracy of City -provided information • LEED/Sites/Greenpoint documentation and design
• Off -site utility analysis
• Repair to utilities encountered during geotechnical investigations not marked by Underground Service Alert (USA) or shown on plans provided by the City.
• Payment of fees (e.g., title report, permit, processing, noticing, plan check, etc.) • Design of specialized foundation/structural systems other than conventional slab on grade and spread footings
• Easement/dedication/annexation exhibits
• Facade renovations for the buildings on -site
• Existing electrical infrastructure is adequately sized to accommodate the revised design loads. No changes to the existing electrical system (panels, transformers, main distribution) are required. • Existing infrastructure for plumbing systems is adequate and revisions are not required. • Existing water pressure is adequate.
• A/V, solar panel, telecommunication, security systems, fire alarm, mechanical heating and a/c System Design is not included as a part of this scope, but can be provided as an additional service. • Value Engineering (mechanical, plumbing and electrical services) • Preparation of separate bid packages and alternates (mechanical, plumbing, and electrical services) • Work associated with systems or components outside the work area is not included except if the system serves the area of work.

Any additional services that RRM Design Group is asked to perform over and above the tasks described above will be subject to a subsequent contract amendment.
4O City of Bell Gardens I Proposal for al
Design, Architecture and Engineering Services forTheVeterans Park Refurbishment and Restroom Page 189 of 797

Title and Reference Sheets
RRM's team will prepare title sheets, as necessary, to convey pertinent general project information. These sheets may include the project name, location, approval blocks, agency contact information, USA alert, basis of survey statement, list of abbreviations, and bid alternate instructions Demolition Plans
RRM's team will prepare demolition plans, at an appropriate scale, for structures and elements requiring removal to implement the park's design. The plans will locate, identify, and describe the removal items and provide instructions for the safe disposal of the demolished work. Additionally, the plans will indicate items to salvage or stockpile such as topsoil for later use in the planting area construction.

Erosion Control Plan
RRM's team will prepare Erosion Control Plans for the site depicting proposed construction BMP in conformance with the State Construction General Permit. The plans will include plan views with locations of proposed BM P, and details of the BMP.

Horizontal Control Plans
RRM will prepare horizontal control plans, at an appropriate scale, for the approved design. The plans will establish all horizontal control for the Project. The plans will also establish construction layout control points and establish a coordinate system for locating all site elements, Site Construction Details
As a companion to the construction plans, we will prepare details for the construction items illustrated on the site construction plans. The details will specify materials, dimensions, colors, and finishes.

Horizontal Control Plans
RRM will prepare horizontal control plans, at an appropriate scale, for the approved design. The plans will establish all horizontal control for the Project. The plans will also establish construction layout control points and establish a coordinate system for locating all site elements.

Construction, Grading, and Drainage Plans
RRM's team will prepare construction, grading and drainage plans, at an appropriate scale, for the approved design based on the topographic survey. The plans will build on the boundary and topographic information and will show all vertical control of the project elements, contour grading, spot elevations, and cut and fill estimates within the project site. The plans will detail drainage facilities around the restroom and facility building area with supporting calculations performed for the sizing of new on -site pipes and inlets as outlined in the above task.

The construction, grading and drainage plans will also present the overall hardscape layout with a keynoting system that identifies construction items, references to appropriate details, and drawing series directions.

RRM will prepare details for the construction items illustrated on the grading plans. The details will specify materials, dimensions, colors, and finishes.

Site Utilities
RRM will prepare plan construction documents for domestic water service, fire water and sanitary sewer, storm drains (e.g., "wet" utilities) contained within the property, and connection to the new restroom and storage facility. Water, sewer, and storm drain plans will include vertical and horizontal design information.

RRM assumes adequate service and capacity for the wet utilities, Electrical and gas are not included in this plan sheet (see site electrical below).

Methodology I Section 1 4i

Page 190 of 797 ends

Park Restroom and Storage Building Plans and Details
RRM's architecture and structural team will prepare construction plans and details for one (1) park building which will include a restroom and storage facility. The construction documents will include exterior and interior plans, materials and systems specifications, Title 24 energy documentation, engineering reports, calculations, and details necessary to process the buildings through the Building Department.

Mechanical Plans and Details
RRM's subconsultant, P2S, will prepare mechanical plans that show airflow calculations and drawings for the new restroom and storage facility which will include new exhaust fans and louvers in the restrooms.

Mechanical details and equipment will be included. Existing building systems will be integrated into existing control systems if available.

Plumbing Plans and Details
RRM's subconsultant, P2S, will prepare plumbing plans for the new restroom and storage facility using plumbing load calculations for domestic water and waste. Drawings will provide ADA compliant fixture and equipment selections, plumbing plans with fixture locations, sewer and vent connections, and riser diagrams with associated fixture unit valves for water and waste. Plumbing details and schedules will also be included.

Site Electrical Plans and Details
RRM's subconsultant, P2S, will prepare electrical plans for the new restroom and storage facility using documented electrical equipment and services, develop electrical distribution system and prepare electrical single -line diagrams. The plans will include the following upgrades: electric hand dryers, LED lighting, exterior mounted LED lighting, outlets, power for mechanical equipment, and an electric chain coiling door.

Electric and gas utility trench locations will be shown schematically based on coordination with a specialty sub -consultant and/or utility service provider. The plans shall be subject to final utility company handout drawings (prepared by others as deferred submittals). We assume adequate service for this project is available directly adjacent to the project frontage.

Specifications
RRM's team will prepare technical specifications (CSI Division 02 through 48 as applicable). This scope assumes the City will prepare all Division 00 and 01 general provision specification sections related to this project and assemble the specifications book.

Planting Plans and Details
RRM's team will prepare planting plans for planting areas. The plans will show the layout of planting indicating plant species, quantity, size and location of all shrubs, ground cover and trees. The plans will indicate anticipated water use for each plant material and separate the planting areas into distinct hydrozone areas for efficient watering. In support of the planting plans, we will prepare planting details that specify the method of construction and proper planting procedures.

Specifications
RRM's team will prepare technical specifications (CSI Division 02 through 48 as applicable). This scope assumes the City will prepare all Division 00 and 01 general provision specification sections related to this project and assemble the specifications book.

Construction Cost Opinions
RRM's construction cost estimator will estimate construction costs at the 65%, 90% and 100% submittal levels. The detailed Construction Cost Opinion will be itemized with supporting item descriptions and unit costs. Due to many variables surrounding bidding and construction conditions, this opinion will not represent a guarantee that bids received, or actual costs of construction will be equal to the opinion. 42 City of Bell Gardens I Proposal for id
Design, Architecture and Engineering Services for The Veterans Park Refurbishment and Restroom Renovation

Page 191 of 797 ends

RRM Project Pictured: La Palma Park, Anaheim; CA
Methodology Section 1

Page 192 of 797 ends

rk
RRM Design Group is fully committed to the success of Veterans Park, and our team is ready to bring focused, high -quality service to every stage of this project. The timing is ideal —several of our long-term projects are transitioning to construction, freeing up key staff to devote their energy and expertise to your park.

In this section, you will find:
• A detailed scope spreadsheet identifying task items, assigned staff, and estimated hours. • A graphic project timeline and milestone schedule to clearly visualize when each task will be completed.

Dedicated Team. Rachael Guraydin, PLA, will serve as your Project Manager, bringing over 13 years of experience in leading complex park projects for public agencies. Her deep understanding of design & project management makes her the ideal point of contact. Supporting Rachael is our seasoned leadership team: Jeff Ferber, Principal -in -Charge with 30+ years of park experience, and Amanda Seibel, Design Director, whose design vision and leadership have helped shape some of California's most beloved parks in her 20 years of experience.

Together, this trio has delivered impactful projects such as Olympus Park (Encinitas), 27 -Acre Park in Wildomar, and Harborvlew Park (Channel Islands Harbor). Their collective experience —over 60 years —is the engine behind our proven success.

For references, we encourage you to connect with Cameron Luna at the City of Wildomar to hear firsthand how this team has successfully delivered.

RRM's QA/QC process is comprehensive, structured, and integrated into every step of the design process:

De,:v?€cote d L:),FL,,€k',€tu
Mana,. er
Each project is assigned a
QA/QC manager who is not
part of the design team,
ensuring an independent,
unbiased review using our
internal QA/QC checklist.

Conducted at each key
phase, these reviews allow
our QA/QC Manager,
Project Manager, and
design team to fine-tune
clarity and evaluate cost -
saving opportunities.

Our QA/QC Manager
ensures all plans and
specifications are fully
coordinated to minimize
errors that can delay
construction.

These QA/QC tasks are clearly itemized in the work plan and occupy their own dedicated time blocks within the project schedule.
44 City of Be(! Gardens I Proposal for Ifs
Design, Architecture and Engineering Services for The Veterans Park Refurbishment and Restroom Page 193 of 797

We understand the importance of financial stewardship. RRM's cost estimation system begins early and evolves throughout the project:
in -House Design am Estimates
At conceptual and .schematic phases, our
multidisciplinary team generates early
construction cost insights.

RRM employs a pragmatic yet flexible scheduling system:
initial Sc
ant'
Rachael will work closely
with City staff to define key
constraints and develop
a realistic timeline with
achievable milestones.

Partnership with €T)CNil
During design development and construction
documentation, we partner with OCMI, a
professional cost estimator, to produce accurate,
market -aligned estimates. This dual -layered system
ensures budget alignment from day one.

Project schedules are
reviewed and updated
monthly, giving the City a
real-time view of progress
and enabling us to make
staffing or schedule
adjustrnents as needed.

Every Wednesday and
Friday, RRM's project
managers collaborate to
assign and balance staff
workload over a two-week
forecast, keeping the
project agile and on truck.

With our methodology, structure, and experience, RRM is ready to deliver a Veterans Park that meets your goals —on time, within scope, and with a design the community will cherish for generations.

Methodology I Section 1
45

Page 194 of 797 ends

r b I *�
Veterans Park Refurbishment
Internal Budget Worksheet

1.02 1.03

1.04 Background Data Co -Section & Reslew
Topographic Survey/Base Mapping
CEQA Compliance
24 Task L Design Development Services

2.01 Conceptual Derlgn Alta mauves

2.02 2.03

2.04 2.05
Dra
ume 3 virtual tO 1 hour ea)
30% Deft", Deve$opftwitt mild Phasing Phan
Task 3: Construction Document Services

3.03 iC
Task 4: Construction Support Services
Documents
LID Standards Manua) Crtfrnpllance Report
4 td
4 41
4 Seniar . Design Director
Landscape / QADC
,Architect/ Manager
Project
Manager
St
41 4
751
8 261
12 6'
3 6
64 38'.
26 13
16 40

1.05 70
Inirtration Suppo

4. 4.

S.02
` .03 QA/[1C ltesit .
4"
24 12
3 24'
60 4
521
10"
8 16
16 48,
321
16 105
32 68
41'
27 14
some 8 virtual e 1 hour ea)
8 PoblIc hlearkng San4w Session —Dr Schematic Plan
Prevention Pi an (SW PPP)
88 6
8 16 City of Bell Gardens Proposal for al
Design, Architecture and Engineering Services for The Veterans Park Refurbishment and Restroom F Page 195 of 797

Manager of
Structural
Engineering
245 0 A.A hOA
41 Architecture
hAur
24 Survey Field
Party Chief
(Prey Wage)
ti ti�l%
13h $ per hour
40 426 $ per hour
441
2 2
4�
32 2.

ItktaCiV
Methodology I Section 1
10 15.
12 Lump sum per task
Cost
Estimation
lump sum pea task
47

Page 196 of 797 ends

Car, u�,o,..,u „a. a,n a ,a. Ro<«,aa,a4
aa
MO 2:1,26
Pon 4,6.76
IGOom
Fr
IOCayS 1,0,1312,26 Fn
7 'tie
ms an. Mon 1.3,25 1,110.11 ,2
',or 1(.105 Fra,
metre mecme.oro Coral Pa..n..lot,. arsf150w,Ittic P.m
Pugura Mgt corn., oo.romeanan
48 City of Bell Gardens I Proposal for gh
Design, Architecture and Engineering Services for The Veterans Park Refurbishment andRestroom� Page 197 of 797

vat
"bt
n Do.Em.nt, C4stEulmR
'ell.. Smola', Iftioteal Campion. Rope,
of omc.00cal,, so" dstimem
Pa'
eF
10O1
Methodology I Section 1
49

Page 198 of 797 ends

ark Restroon
Veterans Park Restroom Renovation
Internal Budget Worksheet
Task 1: Project Initiation and Feasiblity
t.01 utiNty Mapping/Utility Coordination

1.02 Geotechnicai Investigation
Task 2: Design Development Services

2.01 Preliminary Layout Plan B. Client Confirmation Meeting

2.02 2.03

2.04 2.05
Final Schematic Plan
6 Task 3: Construction Document Services

3.02 GS% Draft Construction Docoments

3.04 3.05

3.06 100% Draft Conmttu¢tlon Documents
Permit Processing Assistance
Bid -Rom comtrurtion Documents
Task 4: Construction Support Services
4,03 eiddirtg sappo 1

4.02 4.03

4.04 Construction AdministratIon Support
CGnitenetion Observation

0.erard Orewing3
Task 5: Project Coordination Services
Project Development Team Meetings (assume 8 virtual @ 1 hour e 414
28 42
42 14.
12 16
21,
24 80
32 40
50 City of Bell Gardens Proposal for (�
Design, Architecture and Engineering Services for The Veterans Park Refurbishment and Restroom Page 199 of 797

42. 10 34!
2 17
20'
14 8
16 8
8 16
32 12
10 00
Methodology I Section 1
51

Page 200 of 797 ends

eduie
Re stroom o v a,. 6' o f
ID Teak Hewer Duration sun
v5.-re.x4 PARK RESTKOM INPRovfMENiS SCHEDULE u7. ye Mon 10113125. Tee Nee., 27 28
Project. Reemnaxeance
owCuaw Duey M.I P' v/DSUY CnShcnsbn
65 di, Mon 10119,5 Fil 12,7267.
7121424271 s njsz za s j .21221vw 5 wtsmzno+
92 55
y on 19/5715 Mon 1001,05 10/13 ♦y Notice to Proceed Issned 15 days Mon 10127,5 F. I 51025
i5 days Men 15777.57e F7i WW1,.
2 days Mon 11/17,25 Tee 1171,25
28 Was W. FF715756725
Design Development 178 days Mon 11117/26 PH 7ntixd
Tee 17.2720S
Prepare Omit Senerneee Pier, IQ elays Moe 125,25 Fri 1271.5 HOLIDAY BRE. 10 days Mon l2r22•25 le157.5
Prepero Draft SeWerriveic Plan Ca, Wimaio 10 days Men .175726 Frl 171.5126 qry Review of Dials Schema,. Play 10 dale Mon tit 926 Fnlxrzn 0 Wave Mon 275,25 Men 27926
Prepare Final 5Cherrieec Plan 9 dave Tee Zit ORS Fri 72,07725.

C. Review of Final Sceem,ic Plan 10 de, Men 57,756 FA 555,8 Prepare 505, Demi, Develiewenel Pnehreio 10 (lave M. 572.3,20 Fri 971726 My Pevbw of 50x Design Uwotoe�m+nl PawkoOa 15 ay. Men.SleeE Fn SIIrzS Prepare 100, Dew, Development Package 20 Or, Man 55,5.3 Fe 51575 Ways Men sozno Fd 7a726.

C5V Review Dee.vileieneril Pee 10 deo Mon 708273 Fri 7711756 Myri 7,0,6 Fri. 95555
Pie,. 655, rwiwinialitwElectirrienie COS( Ealleele 10 dayv Men 977.6 Fa 571555 0*7 Rovrere ol6o%eomsliedm�0eo�men p 6704 EMimrvc 70 ems Mon.,. Fn tp15lt5 Peopeie 50.5 Genetructierililiaiiinievile 5 Spec, 30 days Sivie 1077475 Fri 11/2.7.7,6 10 de, Mo 11,5.6 FR 12,11514
ElikEAK 10 de, Man 15521756. Fri 111,7
Cide Review ol DO% Ceoviewlein Deeen-wwW, pee" C. redirnalp 10 clews We 1.77 liteer Cionded 71iii0C OF, Mei Construe!. DieeeelOnis 5 clay, Mee .7,5777 Fe 2726.57 10 tlaye Mon 2/221.27 17.5727
Piepeo Ready Conum.Amn Deoumenle 15 daye Mon Je19R] Fn u,s7 Bela. Award
Notice to Fir*. wel
Project Cmralnxbn Swale.
70 day. 71/15727 Fn 772327
0 de, Tee 7n7227 Tuo 7,7,7
Me Ways Mae liiel9.726. Mori Inv.
635 de., Mon 15'1575 Moe 37725075
o n ycooMlnNon
rinetio

WV OREM,
pare Drell Schematic Plan.. Estimate
G Re
kw.' Draft Schema,. Bien
to Conduct Ctty Council P1eaenteteon. 0rattPi I
Sanematla Pun
551
eleo
II of 5,55
re 105, DesAgn Devi
Pee. Of 1075
52 City of Be,11 Gardens I Proposal for
Design, Architecture and Engineering Services for The Veterans Park Refurbishment and Restroomf Page 201 of 797

8282 I12i F222
a 7 iii222271 ,4221201

48. elopment.Cost Estimate
ri Conlon ['Wen, sac aga
42214 1914202530.1 B 141824 7 4 7
con DOCUMer1Iti CPO Eetirnatt,
0% Construction Documents, Specs S. Cost sfimale
SOX Co4lAru.ort Documents Spec,
6ti
42442on 2274441 er242722ol..nt3037 424+emmt 24470444440, 1207J4nn4122444 F 044074 Wna 221? etu4ry 30]4 Me24+2d1e OES20 5 M1OS610153P 9'41414E428 9 4 iki&T92p Bg B 1)3182328 ZP)121I222I2 i 1311222E 1 5 11 i8312a 1 s 11 142126)1 4.ID152D3530 4.4.14142423 S I41b20384a 4 09 % Consuu4tlon oocumenta, 4,2 6 Coat E4tlmat4
DAV BR
100% ConzIntctlan Documents Spees
x26'1 Conduct onQC on ICA% construction oocomenm
616 imp n,e4,re tom, construction Document, Cosa...ate
of 160%Construction Documents, Specs 6 Coat Estimate
P ale Ready Constructton Documents
116p 6ulmit eld beady Con. Won Docunte44 to Gty
>72a�:ctmz44nrn amn n4.4nd
4127 r notice to 4444ceea maned
Methodology I Section 1
53

Page 202 of 797 ends
Page 203 of 797 ends

Proposal for
Design, Architecture and Engineering Services for The Veterans Park Refurbishment and Restroom Renovation
RRM Project Pictured:

Alex Fiore Teen Center and Goebel Adult Center,
Thousond Oaks, CA

Page 204 ends

subs rn 13 Our Tear
Hiring our company means investing in unparalleled expertise, exceptional service, and innovative solutions tailored to your specific needs. We bring a wealth of experience and a proven track record of success, ensuring that your projects are executed with precision and efficiency. Our dedicated team of professionals is committed to delivering outstanding results, leveraging the latest technologies and best practices to drive your business forward. We pride ourselves on our customer -centric approach, building strong relationships and understanding your unique challenges to provide customized solutions that exceed expectations. By choosing us, you gain a reliable partner dedicated to your growth and success.

City of Bell Gardens
RR
Project Manager
Senior I andscape Architect
Design Director/Public Art Specialist &
Grant Administrator
Design Director & Landscape Architect
Landscape Architecture & Grant Administration
Principal -in -Charge
Managing Partner
Civil Engineer
Project Manager
Project Manager
Surveyor
Supervisor of Surveying
Subconsultants
BELOW
S�i9 x�n(t iu.f,4 t�G
C -Below Surface
Imaging an RMA
Company
Hector Vargas
P2
P2S Inc.

Gary Jewell
Nate Behning
Lars Henderson
Eric Gomez
Ellie Motevailan
MEP
Architect
Manager of Architecture
Landscape Architecture & Archrtectu
Civil Engineer
Engineer. II
Civil & Structural Engineering
Ram
Planner
Principal Planner
urvey & Planning
GPi - Geotechnical
Professionals Inc.

Paul Schade
,ca/En9ine
Structural Engineer
Manager of Structural
Engineering Services
OCMI Inc.

Conor Clarke
Gary Mao
Cast Estimating '..
56 City of Bell Gardens I Proposal for ,ail
Design, Architecture and Engineering Services for The Veterans Park Refurbishment and Restroom P^^^"^'r^^

Page 205 of 797 ends

Creating
Environments
People
Enjoy•
Senior Landscape
Architect with 13 years
of experience
Education
• bachelor of Landscape
Architecture, Minor in
Sustainable Environments,
California Polytechnic State
University, San Luis Obispo, CA
Licenses and more
• Professional Landscape
Architect, CA 6227
• American Society of Landscape
Architects (ASLA), Student
Chapter Member 2008-2013
• American Society of Landscape
Architects (ASLA) Member 2013-
2021
• Chapter Secretary of Southern
California Chapter (SCASLA)
2017-2018
Management and Staffing I Section 2
ect Role: Project Manager;
As a landscape architect, Rachael prioritizes understanding the unique characteristics of each community to deliver an end product that genuinely reflects community desires. She has applied this understanding in a wide variety of public projects, including parks, trails, streetscape and waterfront design. Asa southern California native, Rachael is passionate about her local environment and understands the need for water conservation. She embraces the design challenges that come with the changing environment, and is committed to sustainability,
( r r ien e
• 27 Acre Park, 11 Acre Park,
Regency Heritage Park, Wildomar
• Central Park Master Plan Update,
San Mateo
• Cheeseboro Canyon Trailhead,
Agoura Hills
• City Heritage Park, Parlier
• Guymon Street Pocket Park Site
Development Permit, San Diego
• Harbor View Park, Ventura Harbor
• La Mirada Creek Park Master Plan
• La Palma Green Promenade and
Paseo
• Las Positas Multi -Use Pathway,
Santa Barbara
• Lindero Linear Park,
Westlake Village
• Morro Creek Multi -Use Trail and
Bridge, Morro Bay
• Neff Park Improvements, La
Mirada
• Olympus Park Design, Encinitas
• Otay River Trail Design and
Kestoration, San Diego County
• Port of Long Beach (POLB) Tail
Planning, Long Beach
• Porterfield Creek Trails Open
Space Preserve, Cloverdale
• Potrero Canyon Park, Los Angeles
• Rancho Alegre Master Plan and
Reconstruction, Santa Barbara
• Randolph Street Rails -to -Trails
Feasibility Study, Huntington Park
• Redlands Parks Facility Condition
Assessment
• San Lorenzo Community Park
• San Sevaine Trail Connection,
Fontana
• Santa Barbara Island Park & West
Side Monument (aka Channel
Islands), Oxnard
• Santa Cruz Rail Trail Arts Master
Plan, Santa Cruz
• Santa Cruz Rail Trail Segment 7
and Segment 8, Santa Cruz
• Scotts Valley Park and Playground
Replacement, Encinitas
• Weekes Park Master Plan,
Hayward
• Whittier Greenway Trail East
5/

Page 206 of 797 ends

Creating
Environments
People
Enjoy'
Design Director,
Landscape Architect
& Professional Mosaic
Artist with 20 years of
experience
Education
• Bachelor of Landscape
Architecture, Visual Expression,
California Polytechnic State
University, San Luis Obispo, CA
• Son Diego Mosaic School, San
Diego, CA — Studied advanced
mosaic methods with a focus
on blending fine art into public
spaces.

Licenses and more
• Professional Landscape
Architect, CA, 6504
• LEED AP, CA
• Leadership in Energy and
Environmental Design
Accredited Professional (LEED
AP)
• Surfrider Foundation, Member,
2013 -present
f P,
Project ale: Design irectc)r/Public Art Specialist
Grant Administrator
For 20 years, Amanda has been transforming outdoor spaces into masterful works of design and art. With a rare blend of technical expertise and artistic vision, she offers a unique lens to landscape architecture. As an accomplished mosaic artist with public art installations across united states, Amanda brings a creative depth that allows her to seamlessly integrate art into public park and community spaces.Her ability to refine concepts into detailed, built projects serves as an asset to clients, colleagues, and communities alike. True artistry and compassion guide her design process, from the spark of an idea through to implementation. Specializing in parks and recreational design, Amanda's talent lies in weaving artful experiences with landscape architecture to create spaces that are not only functional, but also deeply meaningful and beautiful. By honoring the creative vision of her clients and collaborating with her design teams, Amanda is committed to enhancing natural and civic spaces for the benefit of all.

Featured project
• 27 Acre Park, 11 Acre Park,
Regency Heritage Park,
Wildomar
• Bradley Park Renovation, San
Marcos
• City Heritage Park, Parlier
• Downey Measure S Park
Improvement Projects -
Discovery Park and Furman Park
• Escondido Creek Trail
• Greenwood Park Renovation,
Hayward
• Greystone Neighborhood Park,
Bakersfield
• Huntington Beach Park Master
Plan
• Johnny Cash Art Trail Master
Plan, Folsom
• Kennedy Park Master Plan,
Hayward
• La Mirada Creek Park Master
Plan
• La Palma Park Expansion and
Renovation, Anaheim
• Lindero Linear Park, Westlake
Village
• Olympus Park Design, Encinitas
• Ortega Park Preliminary Design,
Santa Barbara
• Porterville Fourth Street
Community Center and Park
Design Services
• Potrero Canyon Linear Park,
Pacific Palisades
• Rancho Potrero Group Picnic
Area, Thousand Oaks
• Redlands Parks Facility
Condition Assessment
• Salinas Public Art Master Plan
• San Lorenzo Community Park
Master Plan
• Santa Cruz Rail Trail Public Art
Master Plan
• Scott Valley Park Playground
Replacement, Encinitas
• Sweetwater Regional Park
Improvements,
San Diego County
• Venice Beach Skate Park
• Zumwalt Park Conceptual
Design, Tulare
58 City of Bell Gardens Proposal for
Design, Architecture and Engineering Services for The Veterans Park Refurbishment and Restroom

Page 207 of 797 ends

Creating
Environments
People
Enjoy•
Managing Partner with
40 years of experience
Education
• Bachelor of Science, Landscape
Architecture, California
Polytechnic State University,
San Luis Obispo, CA
Licenses and more
• Professional Landscape
Architect, CA, 2844
• American Society of Landscape
Architects (ASLA), member,
1990 -present
• Central Coast Salmon
Enhancement, 2000-2006
Arroyo Grande Watershed
Forum Steering Committee,
2000-2006
• California Parks and Recreation
Society (CPRS), member,
2000 -present
• National Recreation and Park
Association, member,
• Cal Poly Landscape
Architecture Department
Advisory Committee, member,
2009 -present
Management and Staffing Section 2
incipal-in-Char e
With an early love for the outdoors and a desire to serve the greater community, Jeff Ferber was led to a career in landscape architecture from a young age. Providing over 30 years of experience at RRM, Jeff's keen ability to translate public needs into a relatable design is reflected in each of his projects. As a managing partner of the firm, he offers a team - style approach to leadership and design. With experience in the public and private sectors, focusing on park and planning design, Jeff strives to transmute the collective vision into reality. Valuing effective communication and mutual respect, he is committed to fulfilling the needs of both the client and the community through precise project execution. pro sl e,.`, t
• 27 Acre Park, 11 Acre Park,
Regency Heritage Park,
Wildomar
• Bakersfield Sports Village
• Barney Schwartz Park, Paso
Robles
• Columbus Park Soccer Facility
Design, San Jose
• Dublin Sports Grounds Master
Plan
• Dwight Murphy Park
• El Corazon Community Park
Master Plan, Oceanside
• Estero Park, Isla Vista
• Greenwood Park Renovation,
Hayward
• Ken Mercer Sports Park Skate
Park, Pleasanton
• Kennedy Park Master Plan,
Hayward
• Lindero Linear Park, Westlake
Village
• Meek Estate Park West Terrace,
Hayward
• Mia's Dream Come True
Playground, Hayward
• Olympus Park Design, Encinitas
• Ortega Park
• Pleasanton All -Abilities
Playground
• Rancho Potrero Group Picnic
Area, Thousand Oaks
• Redwood City Downtown Library
Park
• Righetti Ranch Parks, San Luis
Obispo
• San Lorenzo Community Park
Master Plan
• San Luis Obispo Babe Ruth
Baseball Complex Master Plan
• Santa Barbara Island Park &
West Side Monument, Oxnard
• Santa Rosa Park Restrooms
Renovations, San Luis Obispo
• Sapwi Trails Community Park,
Thousand Oaks
• Sinsheimer Park Playground, San
Luis Obispo
• Tennyson Park Master Plan,
Hayward
• Venice Beach Oceanfront Walk
Bike Path and Skate Park
• Ventura Community Sports Park
• Veterans Park, Brentwood
• Via Toledo Neighborhood Park
Master Plan, Hayward
• Weekes Park Master Plan,
Hayward
• Whittier Greenway Trail
• William Payne Park Master Plan,
Livermore
59

Page 208 of 797 ends

Manager of Architecture
with 34 years of
experience
Creating
Environments
People
Enjoy.

Education
• Bachelor of Architecture,
College of Design, Architecture,
Art & Planning, Cincinnati, IN
Licenses and more
• Architect, CA 039678
Tad Lupton AAA, LEP AP
Project Role: Project Architect
As Manager of Architecture, Tad brings unique expertise to the firm's architecture department. From managing and operating his own architecture firm to working as a Walt Disney World Imagineer, his experience is far-ranging. In addition to his diverse professional background, Tad's specific project types vary as well. From residential and mixed -use projects to community -enhancement and custom home development, he offers a unique technical skillset. Above all, Tad is driven to fulfill each client's unique needs through creative and sustainable solutions.

Featured project ee ti i„.7 e 4 I
• 27 Acre Park, 11 Acre Park,
Regency Heritage Park,
Wildomar
• 27 Acre Temporary City Hall
Siting Analysis, Wildomar
• Anaheim Architectural
Development Visioning
Packages for Two Sites
• College Avenue Public Library,
Indianapolis, IN*
• Grand Millenium Center,
Westfield, IN*
• Indianapolis Airport Authority's
New Midfield Terminal,
Indianapolis, IN*
• Mendota City Hall and
Police Station Construction
Documents
• Mendota City Hall and
Policy Station Construction
Documents
• Menlo Park Fire Protection
District Space Needs
Assessment
• Mountain House New Fire
Station
• National Underground Railroad
Freedom Center, Cincinnati,
OH*
• Neff Park Improvements, La
Mirada
• Newport Beach Permit Ready
ADU Plan and Public Outreach
Improvement Services
• Porterville Fourth Street
Community Center and Park
Design
• Riverstone Fire Station No. 58,
Madera
• San Diego County Strategic
Fire Facility Plan
• Zumwalt Park Conceptual
Design and Renovation Final
Design, Tulare
* Work performed prior to Joining RRM
60 City of Bell Gardens Proposal for
Design, Architecture and Engineering Services for The Veterans Park Refurbishment and Restroom P----*;"

Page 209 of 797 ends

Creating
Environments
People
Enjoy•
Project Manager with 14
years of experience
Education
• Bachelor of Science, Civil
Engineering, California State
University, Northridge, CA
Licenses and more
• Professional Engineer, CA,
90156
• American Institute of Steel
Construction (AISC)
• American Society of Civil
Engineers (ASCE)
Management and Staffing Section 2
Role: Civil Engineer Project Manager`
As both a lifelong artist and second -generation engineer, Noah has a passion for residential, parks, and community development. He excels at team coordination and organization which aid his role as a project manager. Noah loves fining creative solutions for projects, and has a particular affinity for stormwater and grading solutions. He has done work for a variety of different agencies throughout California while calling Irvine horne. Noah is an active member of RRM's Professional Practice and Technology committee, the AutoCAD community, and RRM's Technical Systems User Group.
• 27 Acre Park, 11 Acre Park,
Regency Heritage Park,
Wildomar
• Bandini Canyon Trail
Construction Documents,
San Pedro
• Chumash Park Master Plan, Simi
Valley
• Fairmont Terrace Park
Construction Documents,
Hayward
• Foothill Boulevard Master
Plan for Public Improvements,
Claremont
• Harbor Terrace Substantial
Conformance Package,
Avila Beach
• Kennedy Park Construction
Documents, Hayward
• Lindero Linear Park
Construction Documents,
Westlake Village
• Mia's Dream Come True
Playground, Hayward
• Morro Bay Harborwalk
• Neff Park Improvements, La
Mirada
• San Lorenzo Park Community
Park Construction Documents
• Santa Ana River Bike Trail,
Riverside
• Santa Rosa Skate Park,
San Luis Obispo
• Sinsheimer Park Playground,
San Luis Obispo
• Sweetwater Summit
Campground, Bonita
• Tennyson Park Construction
Documents, Hayward
• Whittier Greenway Trail East
61

Page 210 of 797 ends

Engineer it with 6 years
of experience
Creating
Environments
People
Enjoy*
Education
• Bachelor of Science,
Environmental Engineering,
San Diego State University, San
Diego, CA
• Associate Degree, Surveying
and Forest Practices, Kings River
Community College, Reedley, CA
Licenses and more
• Engineer in Training, CA, 171918
COr lan aszk
Project Role: Civil Engineer
With 6 years of professional experience in the workforce, Cordlan has a background of both public and private industry and a passion for recreational projects. Over the years, he has developed skills for site grading, utility design, stormwater quality control, and floodplain management. Cordlan has provided services for projects that span from recreational and residential, to capital improvement, commercial and federal flood control facilities.
• La Palma Promenade, Anaheim
• New Love Park, Santa Maria
* 27 Acre Park, Wildomar
• Creek Park, La Mirada
* Neff Park, La Mirada
• Scott Valley Park, Encinitas
• Tennyson Park, Hayward
• Historic Ranch, San Jose
• Harbor View Park, Ventura
• Mt. Madonna Carnpgrounds,
Santa Clara County
• Escondido Creek Trail,
Escondido
• Rail Trail Segrnents 8-12, Santa
Cruz
• Whittier Greenway Trail,
Whittier
62 City of Bel/ Gardens I Proposal for la
Design, Architecture and Engineering Services for The Veterans Park Refurbishment and Restroom

Page 211 of 797 ends

Creating
Environments
People
Enjoy•
Manager of Structural
Engineering Services
with 21 years of
experience
Education
• Bachelor of Science,
Architectural Engineering,
California Polytechnic State
University, San Luis Obispo, CA
Licenses and more
• Structural Engineer, CA, 55685
• Professional Engineer, CA,
72309
• Leadership in Energy and
Environmental Design
Accredited Professional (LEED
AP)
Management and Staffing I Section 2
Project Role: Structural Engineer
With over a decade of civil and structural engineering experience, Michael's approach to design is steeped in e commitment to detailed precision. Michael offers his extensive expertise for each client, specializing in housing, civil, educational, and recreational design. He has been involved in projects of all sizes, from large-scale steel frame hospitals to 43,000 sq. ft. laboratories to custom playgrounds and park restrooms. Also overseeing the design and code compliance for lateral and gravity systems, Michael is well -versed in a range of project types.

His thorough approach to design and a keen eye for detail translates into procedural and structural integrity.
ra t u r e t e x c.F` S''" 1, e nc
• Alex Fiore Teen Center and
Goebel Adult Center Master
Plan, Thousand Oaks
• Cheng Park Revitalization, San
Luis Obispo
• Downey Measure S Park
Improvement Projects -
Discovery Park, Furman Park,
and Independence Park
• Dublin Sports Grounds Master
Plan, Dublin
• Dwight Murphy Field Final
Design, Santa Barbara
• Grove Park Field and
Playground Renovations,
Berkeley
• Grove Park Field and
Playground Renovations Design
Services, Berkeley
• Kennedy Park Master Plan
Hayward
• La Mirada Creek Park Master
Plan
• Livermore Downtown Core
Landscape Concept and
Stockmen's Park
• Mia's Dream Come True
Playground, Hayward
• Olympus Park Design, Encinitas
• Paso Robles Joint Unified
School District Athletic Fields
• Porterfield Creek Trails Open
Space Preserve, Cloverdale
• Porterville Fourth Street
Community Center and Park
Design Services
• Rancho Alegre Master Plan and
Reconstruction, Santa Barbara
• Righetti Ranch Parks, San Luis
Obispo
• Sapwi Trails Community Park,
Thousand Oaks
• Sinsheimer Park Playground,
San Luis Obispo
• Stafford Lake Park, County of
Marin, Novato
• Tennyson Park Master Plan,
Hayward
63

Page 212 of 797 ends

Supervisor of Surveying
with 41 years of
experience
64 Creating
Environments
People
Enjoy*
Education
• Bachelor of Science,
Agricultural Engineering,
California Polytechnic
University, San Luis Obispo, CA
Licenses and more
• Professional Land Surveyor, CA,
LS7561
Stevete ster
Project Role: Surveyor
Steve has over 35 years of surveying experience, both in the office and in the field. As a project manager his primary responsibility is the management of construction projects. While at RRM Design Group he has performed surveying services such as construction staking, boundary and topographic surveying, for both public and private sector clients. Along with field surveying duties, Steve prepares construction stake calculations, conducts research and analysis of boundaries, and creates boundary, topographic, and ALTA maps. He has experience with surveying equipment such as total and robotic stations and GPS. tureCi project t xpers"encV;x
• 27 Acre Park, 11 Acre Park,
Regency Heritage Park,
Wildomar
• Biddle Park Master Plan, Arroyo
Grande
• Bradley Park Renovation, San
Marcos
• Central Park Master Plan
Update, San Mateo
• Cheng Park Revitalization, San
Luis Obispo
• City Heritage Park, Parlier
• Coastal Trail Survey - Riveria,
San Clemente
• Columbus Park Soccer Facility
Design, San Jose
• Conejo Creek Park Bike Path,
Thousand Oaks •
• Dwight Murphy Field Final •
Design, Santa Barbara
• Kennedy Park Master Plan, •
Hayward
• La Mirada Creek Park Master
Plan
• Lindero Linear Park, Westlake
Village
• Meadow Park Playground
Renovation, San Luis Obispo
• Morro Bay Skate Park
• Paige Lane Neighborhood Park,
Thousand Oaks
• Ramona Garden Park Master
•
•
•
•
•
Plan (CIP), Grover Beach
Rancho Grande Park, Arroyo
Grande
Rancho Potrero Group Picnic
Area, Thousand Oaks
Righetti Ranch Parks, San Luis
Obispo
San Lorenzo Community Park
Master Plan
Santa Barbara Island Park &
West Side Monument (aka
Channel Islands), Oxnard
Santa Rosa Park Playground
Replacement and Restroom
Renovations, San Luis Obispo
Sapwi Trails Community Park,
Thousand Oaks
Vagabond Skate Park, Fresno
Venice Beach Oceanfront Walk
and Bike Path
War Memorial Stadium Paso
Robles Construction Staking,
Paso Robles
�tty of nerr ouruens rrupusar rur 1fl
Design, Architecture and Engineering Services for The Veterans Park Refurbishment and Restroom

Page 213 of 797 ends

Creating
Environments
People
Enjoy°
Principal Planner with 40
years of experience
Education
• Bachelor of Arts, Geography
& Environmental Planning,
University of California Davis
• Graduate Studies, City &
Regional Planning, California
Polytechnic State University,
San Luis Obispo, CA
Licenses and more
• American Institute of Certified
Planners (AICP)
• American Planning Association
(APA)
• SLO Chamber of Commerce
Leadership Program Graduate
Management and Staffing I Section 2
am S A CP
Project Role: Planner
Having worked for the City of San Luis Obispo's Community Development Department for 30 years, Pam brings an invaluable perspective from the other side of the counter to RRM's Planning Group. While with the City, Pam processed several large development applications, including the downtown Court Street and Chinatown developments, Dalidio Ranch, Mindbody, SESLOC, and French Hospital expansions. While at RRM, Pam has also worked on projects for governmental entities such as the Creek and Watershed Management Plan for the City of Goleta; a subdivision ordinance update for the City of Long Beach; a Focused General Plan Update for the City of Dinuba; and affordable housing ordinance updates for various cities. Throughout the process, Pam emphasizes establishing a friendly relationship with her clients to create an environment conducive to success.

Featured projO�3f
• Neff Park Improvements, La
Mirada - CEQA Exemption
• Pittsburg City Park Categorical
Exemption
• Vallejo Franklin Park
Categorical Exemption
• Dinuba Focused General Plan
Update
• Arcadia New Objective Design
and Development Standards
• Carlsbad Objective Design
Standards
• Goleta Watershed
Management Plan
• Long Beach Subdivision
Ordinance
• Lucia Mar School District
Projects Categorical
Exemptions
• Morro Bay Housing Element
Implementation Programs (SB2
and REAP Planning Grant)
• Patterson Downtown Master
Plan - Addendum to the
General Plan EIR
• Vista Zoning Code
Amendments
• Ventura County Initial Study
Assessment Guidelines
65

Page 214 of 797 ends

RPM Project Pictured: Downey Measure S Park Improvement Projects - Independence Park - Futsal and Tennis Multi -use Sports Courts, Downey, CA
Be) City of Bell Gardens I Proposal for
Design, Architecture and Engineering Services for The Veterans Park Refurbishment and Restroom ��^^ ^•°^^

Page 215 of 797 ends

BELO

SUBSURFACE IMAGING
An RMA Com.aanp
Vice President of
Project Management
with 15 years of
experience
Education
• TBD
Licenses and more
• TBD
Hector Vargas
Project Role: Underground Utility Locator
With over 15 years of experience in the construction industry, including 8 years dedicated to utility locating, Hector Vargas brings exceptional leadership to C Below Inc. His diverse roles as a sales representative, project manager, and lead supervisor provide him with comprehensive industry knowledge from project inception to completion. As Vice President of Project Management, he coordinates office and field operations, ensuring the highest standards for utility location accuracy.

Featured project experience
SR -55 Widening Potholing, Orange County, CA: Oversaw a large- scale project requiring 155 potholes across a major highway corridor.

Mr. Vargas ensured all necessary permits were obtained and worked closely with technicians to review findings. He managed field operations, coordinated traffic control plans, and communicated progress and challenges with the client to maintain timelines and budgets.

Lambert Rd Potholing Investigation, Whittier, CA: As Project Manager, Mr. Vargas took charge of all permitting and collaboration with the USA DigAlert system. He led field technicians to locate and mark underground utilities safely and efficiently, ensuring the client had precise data for construction planning while adhering to budget constraints.

Highland and Cedar Potholing, San Bernardino, CA: Managed a complex project involving 39 potholes and 7 slot trenches for the San Bernardino Water Department. Mr. Vargas coordinated permitting, technician schedules, and on -site safety measures while maintaining clear communication with the client to address evolving project requirements.

Jeffrey Potholing Investigation, San Diego, CA: Supervised 57 potholes along busy urban corridors. He ensured smooth traffic control implementation, timely permit approvals, and the accuracy of technician findings. His proactive client communication and attention to safety protocols were critical to the project's success.

Grove/Holt Potholing Investigation, Ontario, CA: Directed a potholing project for Parsons that required high -precision locating and documentation. Mr. Vargas handled permits, coordinated technicians, and reviewed findings to ensure the client received reliable utility data critical for theft infrastructure development.

Mr. Vargas's expertise in managing diverse, high -stakes utility location projects reinforces C Below's commitment to delivering unparalleled accuracy and service excellence.

Management and Staffing I Section 2 67

Page 216 of 797 ends

68 INC
Lighting Specialist and
Senior Electrical Design
Engineer with 32 years
of experience
Education
• Autodesk Building Systems
Licenses and more
• LC Credential, National Council
for Qualifications for the
Lighting Professions (NCQLP),
2002
• fESNA
Gary Jewell l Lc
Project Role: Lighting Specialist Project Manager
Gary Jewell has over 32 years of electrical design experience ranging from tenant improvements to new construction. His experience includes power and lighting systems design for institutional, commercial, and industrial projects. He has extensive knowledge of lighting systems, products, and applications. Gary has served as project manager, determining the project scope, coordinating with clients, coordinating with sub -consultants, and providing construction design documents.

He has served as lead designer engineer on various power and lighting projects with responsibilities that include field investigation, creating proposals, developing construction documents, specifications, and cost estimates, providing construction support and commissioning. Gary's broad knowledge of lighting design principles coupled with his ability to use the latest lighting design programs enables him to produce detailed lighting studies and analysis for numerous projects each year.

Featured project experience
• City of La Mirada, CA
La Mirada Creek Park
Neff Park Improvements
• City of La Palma, CA
La Palma Park Promenade
• City of Los Angeles, CA
FDR Park Improvements
• City of Monterey Park, CA
Edison Trails Park Playground
Equipment Grounding
• City of Pleasanton, CA
Ken Mercer Skate Park
Renovation
• City of San Jose, CA
Columbus Park Soccer Facility
Poer & Lighting
• City of San Juan Capistrano,
CA
Serra Park Playground
Grounding
• City of Santa Barbara, CA
Ortega Park Power & Lighting
• City of Santa Monica, CA
Dwight Murphy Park
Renovation
• City of Temple City, CA
Live Oak Park and Temple City
Park Improvements
• City of Wildomar, CA
27 Acre Park
Wildomar Park Power &
Lighting
• County of Los Angeles,
Rowland Heights, CA
Schabarum Regional
Park Lighting & Power
Improvements
• County of Los Angeles, San
Dimas, CA
F. G. Bonelli Regional Park
Olympic Planning Feasibility
Study
• City of Santa Clarita, CA
New LEED Silver Canyon
Community Center
• City of Laguna Beach, CA
Promenade on Forest
Pedestrian Plaza
City of Bell Gardens Proposal for
Design, Architecture and Engineering Services forThe Veterans Park Refurbishment and Restroom

Page 217 of 797 ends

Mechanical Engineer
with 12 years of
experience
Education
• BS, Mechanical Engineering,
Iowa State University
Licenses and more
• Mechanical Engineer,
California, M37387
• ASHRAE
Management and Staffing l Section 2
ate
Project Rolex Mechanical
Engineer
Nate Behning has 12 years of experience in mechanical engineering and HVAC consulting. His experience includes new building and renovation projects at university and college campuses, office buildings, and athletic facilities. Services have ranged from mechanical equipment replacement to new building design and energy studies. Nate has served as a mechanical engineer on various HVAC airside and hydronic system design projects. His responsibilities entail schematic/conceptual design, construction documents/drawings, life -cycle cost analysis, energy modeling, and construction administration services. His project experience ranges from small tenant improvement projects to large building renovations and new building design.

Featured project experience
• County of Los Angeles,
Malibu, CA
LEED Silver Camp Kilpatrick
Juvenile Detention Center
• City of Lawndale, CA
City Hall HVAC Upgrades
• City of Gendale, CA
Alex Theater
• Los Angeles Mission College,
Sylmar, CA
LEED Gold Media Arts Center
• Los Angeles Community
College District, Los Angeles,
CA
Los Angeles Trade Tech New
Culinary Arts Building
• East LA College, Monterey
Park, CA
LEED Silver Design Math and
Science Complex
• Riverside City College,
Riverside, CA
LEED Silver Student Services &
Administration Building
• San Bernadino Valley College,
San Bernadino, CA
New LEED Silver Gymnasium
• Crafton Hills College, Yucaipa,
CA
New LEED Gold Public Safety &
Allied Health Complex
•
•
•
•
•
•
Mt. San Antonio College,
Walnut, CA
LEED Silver Design Business and
Technology Facility
Mt. San Antonio College,
Walnut, CA
New LEED Silver Design Student
Center
Golden West College,
Huntington Beach, CA
Math & Science Building
Crafton Hills College, Yucaipa,
CA
New LEED Platinum Crafton
Center
San Bernadino Valley College,
San Bernadino, CA
LEED Silver Applied Technology
Building Replacement
Santa Ana College, Santa Ana,
CA
Central Plant Feasibility Study
San Marino Unified School
District, San Marino, CA
District -wide HVAC
Modernization
69

Page 218 of 797 ends

Electrical Engineer with
12 years of experience
Education
* BS, Electrical Engineering,
Pennsylvania State University
Licenses and more
• Electrical Engineer, California,
E22361
Lars Henderson I PE
Project Role: Electrical Engineer
Lars Henderson has over 12 years of experience creating electrical designs for the construction industry. Assignments have included educational institutions, commercial fit -outs, municipal sites, and mission -critical facilities in the Los Angeles and New York City markets.

Electrical service designs, landscape power renovations, and energy - efficient lighting upgrades are areas Lars has accomplishments. Beyond the compliances and routines of designing, it is the client's end goal that Lars strives emphasis towards.

Featured project experience
• City of Beverly Hills, CA
Beverly Gardens Park: Lighting
and Power
• LA County, Los Angeles, CA
Deferred Maintenance for 5
Park Sites
• City of Encinitas, CA
Olympus Park (formerly
Standard Pacific) Lighting and
Power
• Culver City, CA
City Courthouse Core and
Tenant Improvements
• City of Glendora, CA
Glendora Library Expansion
Study
• City of Indio, CA
New City Hall
• City of Indio, CA
Indio Public Safety Campus
Including Fire Station,
Administration Buildings & Call
Center
• City of Indio, CA
Police Station Assessment
• City of Santa Monica, CA
Dwight Murphy Park
Renovation
• City of Temple City, CA
Live Oak Park and Temple City
Park Improvements
•
•
•
•
•
•
•
•
City of Santa Clarita, CA
New LED Silver Canyon
Community Center
City of La Mirada, CA
Fire Station 5 Tenant
Improvements
City of Santa Monica, CA
F. G. Bonelli Regional Park
Olympic Planning Feasibility
Study
City of Santa Monica CA
7th Street Beautification
Construction Support
San Francisco Fire
Department, San Francisco,
CA
Fire Training Facility MEP
Design Criteria
City of Vacaville, CA
Electric Bus Charging Stations
Electrical Infrastructure
LA County Internal Services
Dept., Los Angeles, CA
Centro Maravilla Power &
Lighting Upgrade Criteria
LA County Internal Services
Dept., Pomona, CA
Pomona Department of Public
Social Services Building HVAC
System Replacement
70 City of Bell Gardens ( Proposal for lid
Design, Architecture and Engineering Services for The Veterans Park Refurbishment and Restroom ^^

Page 219 of 797 ends

Senior Plumbing Design
Engineer with 21 years of
experience
Education
• AS, Computer Aided Drafting,
ITT Technical institute
Licenses and more
• Certified in Plumbing Design
(CPD)
• Plumbing Design,, University of
California, Los Angeles
• ASPE
• Green Plumbers°
Management and Staffing Section 2
Role: Plumbing Design Engineer
Eric Gomez has 21 years of plumbing design, fire protection and construction experience. His extensive knowledge spans design, drafting, specifications, plan check submittals, cost estimates, inspections and construction administration. Eric has significant expertise in educational, recreational and office facilities. He has designed a comprehensive range of plumbing and fire protection systems such as campus natural gas supply distribution as part of master planning for future expansions on various college and university campuses. Eric has served as project manager and design engineer on various plumbing system design projects with duties encompassing determination of project scope, design criteria, coordination with the client and project team, provision of construction design documents, written construction design specifications, equipment selections, construction cost estimates, construction support and project management.

Featured project experience
• City of Baldwin Park, CA
Civic Plaza Zocalo Park
• City of La Mirada, CA
Neff Park Improvements
• City of Costa Mesa, CA
Library ADA Upgrades
• City of Indio, CA
New City Hall
• City of Indio, CA
Indio Public Safety Campus
Including Fire Station,
Administration Buildings & Call
Center
• City of Ontario, CA
Access Center & Multi -Purpose
Building
• City of Ontario, CA
Ontario Motor Inn Retrofit to
• Transient Housing
• City of Pomona, CA
Department of Public Social
Services Building HVAC
Replacement
• City of Redlands, CA
Police Station MEP Design
• City of Santa Clarita, CA
New LEED Silver Canyon
Community Center
• City of Santa Cruz, CA
Tannery Dance & Performance
• Building
• County of Los Angeles, Los
Angeles, CA
Hall of Records 7th Floor HVAC
Modifications
• County of Los Angeles,
Malibu, CA
LEED Silver Campus Kilpatrick
Juvenile Detention Center
• San Bernadino Valley College,
San Bernadino, CA
LEED Silver Applied Technology
Building Replacement
• Santa Ana College, Santa Ana,
CA
Central Plant Feasibility Study
• County of Los Angeles,
Arcadia, CA
Live Oak Library Renovation
71

Page 220 of 797 ends

Lighting Designer with
10 years of experience
NC
Education
• MS, Building Science, University
of Southern California
• Master of Architecture,
University of Tehran
• BA, Architecture, Azad
University, Tehran, Iran
Licenses and more
• LEED Green Associate,
ID#10586451, 2012
• LC Credential, National Council
for Qualifications for the
Lighting Professions (NCQLP),
2023
• IESNA
Ellie Motevalian i Lc
Project Role: Lighting Designer
Ellie (Elham) Motevalian has more than 10 years of architectural and lighting design experience ranging from hospitality and retail to educational, healthcare, and corporate projects. Her experience encompasses conceptual lighting design, fixture selection, photometric studies, daylight and visual comfort analysis. Ellie's award -winning knowledge of lighting design and new lighting technologies enables her to design solutions that meet the clients` needs and expectations.

Featured project experience
• City of La Mirada, CA
Neff Park Renovation
• City of La Palma, CA
La Palma Park and Swan Street
Parking Lot Renovations
• City of Long Beach, CA
Bixby Park Bandshell Lighting
Lighting Improvements
• City of Wildomar, CA
Wildomar Park Power &
Lighting
• County of Los Angeles Public
• Works, Marina del Rey, CA
Chace Park Electrical &
Plumbing
• Design
• City of Beverly Hills, CA
Judy Chicago Artwork Lighting
• City of Indio, CA
Indio Public Safety Campus
Including Fire Station,
Administration & Call Center
• City of Santa Monica, CA
Dwight Murphy Park
Renovation
• City of Temple City, CA
Live Oak Park and Temple City
Park Improvements
• City of Mammoth Lakes, CA
Mammoth Lakes Civic Center
Renovation
• City of Indio, CA
City Hall
• City of Indio, CA
New Police Department
Headquarters
• City of Santa Clarita, CA
New LEED Silver Canyon
Community Center
• City of Redlands CA
Police Station
• County of Los Angeles Public
• Works, Los Angeles, CA
Civic Center Central Plant
Phase 2
• County of San Bernardino,
Colton, CA
Building 851 Cooley Renovation
• County of San Bernardino, San
Bernadino, CA
Fire Station #41
• County of San Bernardino,
Victorville, CA
Victorville District Attorney's
Office Remodel
• Yorba Linda Friends of Church
Yorba Linda, CA
New Pavilion & Cafe Building
Lighting Design
72 City of Bell Gardens Proposal for
Design, Architecture and Engineering Services for The Veterans Park Refurbishment andRestroomP�^^ �• ^^

Page 221 of 797 ends

Project Manager and
Principal with 33 years
of experience
Education
• Ms Civil Engineering
(Geotechnical Concentration)
California State University,
Long Beach, CA
• 85 Civil Engineering, California
Polytechnic „State University,
San Luis Obispo, CA
Licenses and more
• Registered Professional Civil
Engineer, State of California
(RCE No. 49679)
• Registered Geotechnical
Engineer, State of California
(RGE No, 2371)
• American Society of Civil
Engineers, LA Section
Administration Committee,
Choir 1991-1998
Management and Staffing I Section 2
•
ProjectRole: Geotechnical Enginee
Since 1989, Paul has provided geotechnical consulting services on a variety of geotechnical projects, including low -to -high rise (up to 26 stories) buildings, parking structures, hospitals, retail centers, courthouses, sports arenas and stadiums, parks, educational and recreational facilities, airports, pipelines, entertainment facilities, cathedrals and churches, landfills, bridges, military base facilities, tanks, roadways, and forensic studies.

Paul has been the Project Manager and Principal -in -Charge for three County of Los Angeles on -call geotechnical and materials testing contracts (2011 to 2021), as well as five consecutive 5 -year on -call geotechnical contracts for the Los Angeles Unified School District (2000 to 2025). He has extensive experience in foundation design, including using ground improvement techniques to support settlement sensitive structures with high column loads on shallow spread foundations.

Featured project experience
• Earvin "Magic" Johnson Park,
Compton
• Park to Playa Pedestrian Train,
Culver City
• Dan Blocker Beach Park Area,
Malibu
• Biola University Athletic Field/
Parking Structure, La Mirada
• Neff Park, La Mirada
• Home Depot, La Mirada
Prologis Industrial
Development, La Mirada
• Oxford Retention Basin,
Marina del Rey
• San Gabriel Valley Aquatic
Center, La Puente
• White Point Park Renovations,
San Pedro
• Burton Chase Park,
Marina del Rey
• Whittier Narrows Park
Improvements, Whittier
73

Page 222 of 797 ends

Cost Manager with 13
years of experience
Education
• B.A Ethical & Political
Philosophy, Brown University,
Providence, RI
Licenses and more
• Society of American Military
Engineers, SAME
• Association for Advancement of
Cost Engineering International,
AACE International
• American Society for
Professional Estimators, ASPE
ProjectRole: CostManager
Conor brings diverse experience providing cost estimating, financial analysis and project controls. He is responsible for quantity analysis, on -screen take off, specification review, and preparation of crew - based cost models, as well as client relations and the attraction of new business. Conor works, as an integral member of the cost management team throughout the duration of each individual project. His versatile strengths have been utilized on projects within the municipal, government, educational, healthcare, and hospitality sectors, Conor has worked on projects with values ranging from under $1 million to more than $1 billion.

Featured project experience
• Civic Improvements and PD
Restroom Modifications,
Downey
• Community Center HVAC
Replacement and Roof
Recovering, Las Vegas
• La Mirada Creek Park Vehicle
Bridge Project, La Mirada
• Expo Park Dispatch Relocation,
Los Angeles
• Exposition Park Fall Protection,
Los Angeles
• Exposition Park Pay Stations &
Gate, Los Angeles
• Five Wounds Trail, San Jose
• Measure S Projects, Downey
• Neff Park, La Mirada
• Parks and Recreation and
Streets Department, Vancouver
74 City of Bell Gardens I Proposal for f
Design, Architecture and Engineering Services for The Veterans Park Refurbishment and Restroom P^^^ ^^

Page 223 of 797 ends

()CM", Inc.

Senior Cost Estimator
with 9 years of
experience
Education
• 8S, Civil Engineering California
State University, Long Beach
Management and Staffing Section 2
Gary Mao
Project Role: Senior Cost Estimator
As a Senior Cost Estimator with over 10 years of experience in construction, engineering, and real estate development, Gary provides budget strategies and value engineering to increase certainty throughout each step of a project's development lifecycle. He has been involved in a wide-ranging portfolio of complex projects, from local community -driven facilities to large-scale mixed -use towers.

From procurement strategy to monitoring risk, Gary advises project teams on ways to align scope and design with the budget. As an advisor and partner, Gary works collaboratively with team members to serve as an extension of the owner's development process in both the public and private sectors.

Featured project experience
• Cabrillo CCD: Pedestrian Bridge
Repair and ADA Upgrades
• CA DGS: 5B1203
Decarbonization Planning
• City of La Mirada: Neff Park
Improvement
• County of Sacramento: RCCC
Control Room Renovation
• DOI NPS: Edgar Allen Poe
House, Replace HVAC
&Electrical System
• Fremont Union HSD: Field
House
• Fremont USD: FHS CTE and
Maintenance Building
• Indian Health Services (IHS):

Fort Yuma Monument Design
• La Mirada Creek Park Vehichle
Bridge Project
• Neff Park, La Mirada
• New Mexico Dept of Public
Safety: LERB Interior Tenant
Improvements
• New Mexico Dept of Public
Safety: Metropolitan Complex
• New Mexico General Services
Dept: Veteran Skilled Nursing
and Small Homes, Enhanced
Accessibility Assessment
• Oak Grove SD: Baldwin
Elementary School
Modernization
• PeaceHealth: St. Joseph
Medical Center West Pavilion
• Resurrection Greek Orthodox
Church: New Site and Building
• San Marcos USD: Knob Hill
Elementary School Whole Site
Modernization
• UCSF: Parnassus Hall Miilberry
Union East Third Floor Remodel
• VA: Fresno, Seismic
Rehabilitation
• VA: Tucson: Plumbing
Replacement
• VA: Walla Walla Solar Array
75 Page224of797

Page 225 of 797 ends

laFP r,,, k3'.U"VWRb',VWaM.ea ',Ali,W&', tl4tlla,.LVHa"J4",'w"t0tBgM'(w?:,Gd,k.Nun,",q{o9li4" : kAV,WWtiiki%,Wt(SSN\inv,., d« A4'1\44CiWV4aVAL`.tt,t*rAkmW,tia,;v), "YP ,,:aai,% ,,,,,,iAtgm ,,,% ''^lanr 4 „4
Proposal for
Design, Architecture and Engineering Services for The Veterans Park Refurbishment and Restroom Renovation
RRM Project Pictured:

Righett Ranch Parks, San Luis Obispo, CA
77

Page 226 of 797 ends

r
r
RRM Design Group has extensive experience designing and revitalizing public parks with a strong emphasis on functional infrastructure that supports community programming and long-term maintenance. Our work includes the planning and design of outdoor amphitheaters and community stages that serve as focal points for cultural events and gatherings, as well as the integration of accessible restroom facilities and strategically placed storage and maintenance buildings to support daily operations. We understand the importance of blending utility with aesthetics creating spaces that are both inviting and durable.

COW .. .rsi, ff(.
,ii
78 City of (3e11 Gardens I Proposal for aS
Design, Architecture and Engineering Services forThe Veterans Park Refurbishment and Restroom f

Page 227 of 797 ends

Qualifications, Experience and References Section 3 79

Page 228 of 797 ends

ter Cc. enlist ty
RRM Design Group has a strong track record in designing interior community spaces that foster connection, creativity, and functionality. Our experience includes the renovation and new construction of recreational halls, flexible activity classrooms, and multi -use community centers that support a wide range of programming needs. We specialize in integrating essential amenities such as commercial -grade kitchen facilities, ADA- compliant restrooms, and indoor stages to support performances, events, and cultural gatherings. With a focus on durability, accessibility, and user comfort, our designs reflect the unique character of each community while meeting operational and maintenance needs. RRM's collaborative approach ensures that each space is thoughtfully planned to serve both current and future generations. 80 City of Be!! Gardens ( Proposal for
Design, Architecture and Engineering Services for The Veterans Park Refurbishment and Restroom "^^s'=*r^^

Page 229 of 797 ends

Qualifications, Experience and References Section 3 81

Page 230 of 797 ends

RRM Design Group has extensive experience designing and renovating athletic and play facilities that promote active lifestyles and community engagement. Our work includes multi -sport fields and courts such as basketball, tennis, futsal, and volleyball —enhanced with durable surfacing, integrated shade structures, and ADA-accessible spectator seating. We've successfully implemented stadium and field lighting systems that extend usability into evening hours while meeting safety and energy efficiency standards. RRM also specializes in designing interactive splash pads and play zones that combine fun, safety, and visual appeal. Our comprehensive approach ensures that each recreational element is thoughtfully planned to support long-term maintenance, programming flexibility, and inclusive access for all ages.

P.

Sri
82 City of Bell Gurdens Proposal for
Design, Architecture and Engineering Servicesfor The Veterans Park Refurbishment and Restroom

Page 231 of 797 ends

Qualifications, Experience and References Section 3 83

Page 232 of 797 ends

RRM Design Group excels in designing serene and functional landscape spaces that invite rest, reflection, and community gathering. Our experience includes the integration of native and drought -tolerant plantings, therapeutic gardens, and shaded picnic areas that enhance both ecological value and user comfort. We thoughtfully design pedestrian pathways and seating zones to encourage accessibility and circulation while supporting passive recreation. Whether creating quiet garden retreats or vibrant social nodes, RRM's landscape architecture balances beauty, sustainability, and long-term maintenance to enrich the overall park experience.
81 City of Bell Gardens Proposal for
Design, Architecture and Engineering Services for The Veterans Park Refurbishment and Restroom RPnnvatinn

Page 233 of 797 ends

Qualifications, Experience and References I Section 3 Sb

Page 234 of 797 ends

'aft Park a n d
i'i'i i s; h e at e,
Downtown Tulare, and specifically Zumwalt Park, needed a boost. The City saw its potential —not just as a park, but as a central gathering place and economic catalyst for the entire downtown core. RRM partnered with the City to reimagine the park from the ground up. Our team led the project from early visioning through entitlement and construction documents. Early on, we hosted an open house -style community event to shape the design around what residents wanted most: an active, welcoming space that could support a wide range of community uses.

The new Zumwalt Park delivers just that. At its center is the Adventist Health Amphitheater, complete with a stage, green room, dressing rooms, terraced seating, and a cooling misting system. We also added a splash pad, a modern playground, enhanced landscaping and lighting, new restrooms, a refreshed gazebo, and thoughtful streetscape improvements.

Funded by the American Rescue Plan Act (ARRA), the park officially reopened in 2025. Since then, it has become a vibrant community hub, hosting concerts, festivals, fitness classes, and public events —many programmed in partnership with Spade Entertainment. The renewed Zumwalt Park is helping breathe new life into downtown Tulare.

City of Tulare
Tulare. CA
• Landscape Architecture
• Architecture
• Lie[ rvicKay - Principal
• Amanda Seibe! - Project Manager
• Tad Lupton -Architect

3.S Acres
2022 2025
86 City of Bell Gardens I Proposal for 1r,
Design, Architecture and Engineering Services for The Veterans Park Refurbishment and Restroom Renovation

Page 235 of 797 ends

Qualifications, Experience and References Section 3 87

Page 236 of 797 ends

t" •
RRM Design Group was selected by the City of Downey to lead the design and implementation of park improvements at Discovery, Furman, and Independence Parks. Completed within a six-month timeline, these projects reflect our ability to deliver high -quality, community -responsive designs under tight schedules. Each park plan was tailored to preserve the existing character while enhancing usability through thoughtful upgrades such as new picnic shelters with electrical connections, expanded BBQ and seating areas, and upgraded restrooms and maintenance/storage facilities to support long- term operations.

Recreational enhancements included multi -sport courts, resurfaced play areas, improved fencing and backstops, and a revitalized fitness circuit.

Discovery Park's synthetic turf soccer field and Musco Sports Lighting extended playability and safety into the evening hours. Landscape and garden improvements were integrated throughout the parks to enhance aesthetics, shade, and environmental resilience. These comprehensive upgrades demonstrate RRM's commitment to creating inclusive, flexible, and sustainable public space
City of Downey
Downey, CA
• Landscape Architecture
• Civil Engineering
• Surveying
• Mike Sherrod Principal/Project
Manager
• Kayla Szubielski - Project Manager
• Amanda Seibel - Design Director
• Michael Doremus - Structural Engineer
• Diane !3athgate - Planning Principal
2018-2020
88 City of Bell Gardens Proposal for u
Design, Architecture and Engineering Services for The Veterans Park Refurbishment and Restroom RPnnvatinn

Page 237 of 797 ends

Qualifications, Experience and References Section 3 89

Page 238 of 797 ends

MOM, d
Conejo Recreation and Park District
RRM Design Group was selected by the Conejo Recreation and Park District and the City of Thousand Oaks to prepare landscape architectural and architectural design services for the Alex Fiore Teen Center and Goebel Adult Community Center Master Plan Project improvements at an existing park facility site. The project consists of various site upgrades and an overall modernization of the existing structure, including an outdoor multi- use court and event area, shaded gathering area, alternative game area, outdoor classroom/activity area, skate plaza, shaded outdoor fitness area, with renovations of existing restrooms, kitchen, storage, outdoor patio, miscellaneous updates, ceiling improvements, security system, outdoor speakers, exterior electrical and lighting upgrades.

Thousand Oaks, CA
• Landacape Architecture,
• Architecture,
• Gvil Fngineerrng
• Structural Lngineerrng
• Surveying
• Lie( McKay Pit ipul
• Lance Wierschem - Project Monagcr
• Michael Doremus - 5tructurol
Lngrneer
2019-2023
90 City of Bell Gardens ( Proposal for
Design, Architecture and Engineering Services for The Veterans Park Refurbishment and Restroom RPnrwntrnn

Page 239 of 797 ends

Qualifications, Experience and References I Section 3 91

Page 240 of 797 ends

y r 44
92 "" auM:k "tia,, t fir, e' ,.fit. f
The City of La Mirada hired RRM Design Group to develop a schematic plan and renderings for Neff Park that would eventually continue through the construction documentation process. Neff Park is nestled into the center of a suburban neighborhood in La Mirada with a unique historic background.

Three structures remain and some sport courts, a playground, and picnic areas have been added. As a part of the design phase, RRM's team designed upgraded sport court facilities, picnic areas including a picnic structure, updated restroom facilities, a perimeter path, low water use planting and dealt with drainage issues with the use of a naturally planted swale. Based on City and community input, the design was improved upon and is now ready for the construction documentation phase.

City of La Mirada, CA
La Mirada, CA
• Landscape Architecture
• C101 Engineering
• Architecture
• Lief McKay - Principal
• Lance Wrerschem - Project Manager
• Amanda.Seibel Tr- Design Director
• Turf Lupton -Architect
• Michael l)orernus -Structural Fnymeer
10 Acres
2023 -Present
City of Bell Gardens I Proposal for
Design, Architecture and Engineering ServicesforThe Veterans Park Refurbishment and Restroom Renovation

Page 241 of 797 ends

The City of Anaheim envisioned this important project to enhance recreation opportunities and the quality of life for the community at large. After extensive community engagement, a conceptual site plan was created. Our team was hired to work with the City, Staff, and Stakeholders to further develop the plan according to the communities' needs and desires and elevate the concept by creating a meaningful place, not just a design, RRM's history working on the park, street, and parking lot with the City of Anaheim has proven successful. La Palma Parkway is currently under construction, and Swan Street Parking Lot has been permitted. La Palma Park and the construction of Swan Street Parking Lot are the final pieces to complete this valuable trifecta for the City.

City of Anaheim
Anaheim, CA
• Landscape Architecture
Mike Sherrod - Pnncipal/Project
Manager
• Amanda Serhel - Design Director
• Rachne! Gin uydui - Senior
Landscape Architect
• Nonh Waiters - Civil Engineer
• Michael Doremus - Stnx-tural
Engineer
Steve Webster Supervisor of
Surveying
Cordlop Niaszk Engineer II
2019 Prescnt
Qualifications, Experience and References Section 3 43
Page242of797

Portervilie; CA
The Porterville Community Center and Park project will transform an under -developed public lot into a vibrant recreational space. The park features an ADA playground, splash pad, challenge course, mini -pitch soccer arena, climbing boulder, pump track, trail, and sheltered picnic areas. The community center, designed as an indoor facility, will allow citizens a space to exercise and gather while being shielded from the area's poor air quality, caused by various agricultural activities. This project aims to address the lack of amenities in the area and foster community engagement, while also considering the environmental and social challenges faced by the city.

The ADA playground will ensure inclusivity for children of all abilities, while the pump track caters to biking and skateboarding enthusiasts. The fully connected trail system will enhance accessibility for walking, jogging, and cycling. The community center will serve as a hub for various events and activities, promoting social interaction and physical well-being. Overall, the project will revitalize the public land, providing a dynamic and inclusive space where residents can come together, enjoy indoor and outdoor activities, and strengthen community bonds.

City of Pm ferville
• Landscape Architecture
• Architecture
• Lief R4cKoy Principal
• Lance Wierschem - Project Manager
• Amanda Seibet - Design Director
• kid Lupton -Architect
• Michael Doremus - Structural Engineer
2022 -Present
94 City of Bell Gardens I Proposal for ro4
Design, Architecture and Engineering Services for The Veterans Park Refurbishment and Restroom Renovation

Page 243 of 797 ends

City of Encinita
The City of Encinitas tasked RRM with transforming a blank slate of land into a 3.1 -acre neighborhood park. A robust public outreach process defined community's desires and set the program, including space for yoga and fitness classes, dog park, skate feature and bike pump track, colorful play elements with an adventure hill, picnicking, shade structures, public art, and a garden designed in collaboration with the San Diego Botanical Garden.

The ongoing success of this park was due to effective public outreach and collaboration with City staff, namely Public Works, Parks, Recreation and Cultural Arts Department, and maintenance staff. Olympus Park has been honored with several awards and remains a top visited park in San Diego County.

Encinitas CA
• Landscape Architecture
• Civil Engineering
• Surveying
• Jeff Ferber- Principal
• Amanda Seibel - Project Manager
• Rachael Guraydrn - Senior
Landscape Architect

3.1 Acres
2017-2027
Qualifications, Experience and References Section 3 95
Page244of797

Working closely with the City's Parks and Public Works staff, RRM Design Group provided landscape architectural services to develop the design from concept to construction on this eight -acre neighborhood park. The final park elements, which were a direct result of community input gathered at an RRM-facilitated community meeting, include a large shade structure, playground, splash pad, basketball courts, group and individual picnic areas, a paved perimeter loop path, flexible open grass areas, restroom and parking lot.

RRM also provided full design services for a new fire station that is located within the park boundaries.

City of Bakersfield
Bakersfield, CA
Landscape Architecture
• Mike Sherrod - Principal/Projec(
Manager
• Lief McKay- Project Manager
• Amanda Seibel- Design Dirertnr
9 Acres
2007-2011
96 City of Bell Gardens Proposal for }; '
Design, Arc hitecture and Engineering Services forThe Veterans Park Refurbishment and Restroom Ranovatir n

Page 245 of 797 ends

ic+
City o(Wildomar
RRM is guiding community outreach, trail design, habitat enhancement, and park master planning for a 27 acre regional park in Wildomar, CA. This future park is undeveloped land with natural open space and hilly terrain. The goal is to preserve natural scenic elements of the site while creating a recreational space that all mernbers of the region can enjoy. The preferred concept plan includes a community building and amphitheater, natural adventure play, walking paths and trails, creek enhancement, bike pump track and skills course, exercise stations, community green, and interpretive educational experiences throughout the park. RRM is currently working on Phase 1 of the park project to be built in the next couple of years.

Qualifications, Experience and References I Section 3
Wildomor, CA
• Landscape Architecture
• Architecture
• Civil Engineering
• Surveying
• Mike Sherrod - Principal/Project
Manager
• Rachael Guraydin - Project Manager
• Amanda Seibel • Assistant Project
NJanager
• Jeff Ferber - Ponciapl Planner
• lad Lupton -Architect
• Noah Walters - Civil Engineer
• Cord(an Mastk - Fngineer N
• Steve Webster - Supervisor of Surveying
27 Acres
2017 -Present
97 Page246of797

1i
Art
RRM Design Group is deeply committed to honoring community identity and cultural integrity in every park and public space we design. Our approach is rooted in meaningful engagement with local stakeholders to ensure that interpretive elements, interactive exhibits, and public art installations authentically reflect the values, history, and character of the surrounding community. We thoughtfully integrate storytelling through design whether through culturally significant landscaping, educational signage, or art that celebrates local heritage. By weaving cultural expression into the physical environment, RRM creates spaces that foster pride, inclusivity, and a lasting sense of place.
/10
98 City of E3e// Gardens I Proposal for
Design, Architecture and Engineering Services for The Veterans Park Refurbishment and Restroom R.^'wztin^

Page 247 of 797 ends

RRM Design Group excels at designing parks that balance quality, cost -efficiency, and long-term vision especially within the constraints of public funding. With deep expertise in grant administration, phased implementation, and project coordination, our team has successfully delivered over 20 grant -funded and phased parks and recreation projects. We work closely with municipalities and agencies to align design solutions with available resources, ensuring each phase provides meaningful community benefit. Beyond design, RRM offers comprehensive Public Works related services including project, grant, and contract administration, and we are highly familiar with federal, state, and regional/local agency requirements. Our extensive experience spanning hundreds of city, county, and state/federal projects makes us a trusted partner in navigating complex funding landscapes and delivering beautiful, durable, and functional public spaces that evolve successfully over time.

Qualifications, Experience and References Section 3 99
Page248of797

RRM Project Pictured: Whither Gre enway Trail and Trail East - Shade Structure, Whittier, CA TOO City of Bell Gnrdens I Proposal for 4
Design, Architecture and Engineering Services forThe Veterans Park Refurbishment and Restroom Renovation

Page 249 of 797 ends

e
Jodi Rios
Associate Project Planner
Contact: (714) 765-4901 I [email protected]
CHent City of Anaheim I City Hall, 200 S. Anaheim
Blvd., Anaheim, CA 92805
Projects La Palma Park, Green Promenade and Paseo
S4'a, page 931ydfulf cose study
John L. j ka.sE, , PE
Assistant City Manager (Former)
contact (949) 350-9225 I [email protected]
Client City of Downey 111111 Brookshire Avenue,
Downey, CA 90241
Project Downey Measure S Park Improvement
Projects Furman, Independence, Discovery Parks
,;.:.r i s; i
General Manager
contact: (805) 495-6471 I [email protected]
riiiente City of Thousand Oaks 1403 West Hillcrest
Drive, Thousand Oaks, CA 91360
Project Paige Lane Neighborhood Park
Qualifications, Experience and References I Section 3
Cameron Luna
Associate Engineer
conta.£ct: (951) 677-7751 ) [email protected]
Client; City of Wilomar ) 23873 Clinton Keith Road, Ste. 201, Wildomar, CA 92595
Project ject: 27 Acre and 11 Acre Parks
fur rose study
.,. a v@ d e Norgard
Parks Operations Manager
Contact (760) 633-2755 I [email protected]
C erle City of Encinitas I 505 S. Vulcan Ave, Encinitas, CA 92024
Project, Olympus Park
prdee 95 tor lytit £,case . ,.tar
ieni`p€,fe
City Manager (Formerly Assistant City
Manager and Director of Parks, Recreation,
and Cultural Arts)
contact: (760) 633-2610 I [email protected]
Cant. City of Encinitas ) 505 S. Vulcan Ave, Encinitas, CA 92024
101

Page 250 of 797 ends
Page 251 of 797 ends

„ti. a'1„ x .1 s c „
Proposal for
Design, Architecture and Engineering Services for The Veterans Park Refurbishment and Restroom Renovation
The Proposal Price Sheet, labeled "Attachment A" for the Veterans Park Refurbishment and Restroom Renovation project, will be submitted as follows:
• Hard Copy Submittal: Included as a separate document enclosed in a sealed envelope. • Electronic Submittal: Provided as a separate PDF attachment via email.

For details regarding hourly rates and team availability, please refer to the Methodology Section, pages 46-53.

RRM Project Pictured:

Santa Claritn Community Center, Santa Claritc, CA
103

Page 252 of 797 ends

RRM Project Pictured: Kennedy Park, Hayward, CA
Proposal For Design, Architecture and Engineering Services for The Veterans Park Refurbishment and Restroom Renovation
104

Page 253 of 797 ends

t
s
D']
RRM Design Group does not have any additions or exceptions to the provisions and conditons of the City standard professional services agreement.

ACKNOWLEDGEMENT OF CITY'S STANDARD FORM OF AGREEMENT
I, the undersigned, certify that I, Jeff Ferber [insert name] am the Managing Partner [insert title] of RRM Design Group [insert proposer name], the party making the proposal for award of an agreement for DESIGN, ARCHITECTURE AND ENGINEERING SERVICES ("Proposer") and, on behalf of the Proposer, hereby:

Accept City's Standard Form of Agreement — check one box.

As is, without qualifications or modifications.
❑ As modified by attachment. [Proposer to provide]
I certify that I am authorized to sign this Consent Form on behalf of the Proposer.

Executed this 2 day of October , 2025 at San Luis Obispo , California.

Signature of Officer Jeff Ferber Printed/Typed Name of Officer Managing Partner Title of Officer Senior Vice President 22 Additions or Exceptions Section 5 105
Page254of797

Page 255 of 797 ends

L,
Proposal for
Design, Architecture and Engineering Services for The Veterans Park Refurbishment and Restroom Renovation
RRM Project Pictured:

Paige Lane Neighborhood Park, Thousand
Oaks, CA
10/

Page 256 of 797 ends

41 Case Name: e' ,
Date of Claim: 11/25/20
Claim Detail: RRM is supporting the City of Pismo
Beach in the defense of a claim that involves a pre -
manufactured play product. RRM prepared site plans
for the project and did not manufacture or install
the concrete play element that is the subject of the
personal injury claim.

Project Name: Pismo Beach Pier Plaza and Parking
Lot Upgrade and Price Street Streetscape
Project Owner/Respondent: City of Pismo Beach
Applicable Court: County of San Luis Obispo
Current Status: In litigation
RRM Project Pictured:

Redwood City Downtown Parks and Bay
Connectivity - Stage, Redwood City, CA
108 City of Bell Gardens Proposal for 4
Design, Architecture and Engineering Services for The Veterans Park Refurbishment and Restroom Renovation

Page 257 of 797 ends

TR TYPE OF INSURANCE
ACC" RO`'

CERTIFICATE OF LIABILITY INSURANCE

DATE (IVIM/DDNYVY)
7/2/2025
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS

CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED

REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER
IMPORTANT: If the certificate holder Is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed.

If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(sy.

PRODUCER
AssuredPartners Design Professionals Insurance Services, LLC 3697 Mt. Diablo Blvd Suite 230
Lafayette CA 94549

INSURED
RRM Design Group
805 543-1794
3765 S. Higuera St., Suite 102
San Luis Obispo CA 93401
License#: 6003745
R RMDESI-J2

CONTACT - -- - ---
NAME: Sandy Peters
PHONE
ADDRESS DeslgnProCeFIS ASSureCiPartnerS.Cpm _
INSURERIs) AFFORDING COVERAGE
INSURER. Travelers Casually and Suree Co of America
INSURER C: Hartford Underwriters Insurance Company__
INSURER D : Sentinel Insurance Company

INSURER F
COVERAGES CERTIFICATE NUMBER: 1284423358 REVISION NUMBER:

NAIL n
27120
31194
30104
11000

THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM 011 CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS

CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.

R AI]t$0600R ------------ POLICY EFF POLICY EXP
POLICY NUMBER LENt00IYYYYl DAWN:, NYBY1 LIMITS
ERCIAL GENERALLIABIUTY i 84SBWBMSWFR 6/30/2025 6130(2026

LAIMS-MADE X OCCUR
EEL AGGREGATE LIMIT APPLIES PER'.

POLICY X PRO- LOC
JECT
THER'.
x
EACH OCCURRENCE $ 1,000,000

IINAVAGE TO RENTED --
EREMI ES rE .steurrercmt $1000,000
MED EXP'Am one per of $10.000
PERSONAL &ACV INJURY 51,000,000
GENERAL AGGREGATE $2,000,000
[PRODUCTS - CORP/OP AGG :82,000,000

AUTOMOBILE LIABILIITY
X+, ANY AUTO
OWNED

AUTOS ONLY

HIRTO AUED S ONLY

SCHEDULED
AUTOS
A NEY

AUTOS ONLY
84UEGACI692 ':; 6/30(2025
6(30(2026 CODE ICED SINGLE LIMIT
[£a cclEeBODILY INJURY (Par person)
BODILY INJURY (Per acc dent)

PROPERTY DAMAGE
1PU, yeefamv,_...

X °1. UMBRELLA LIAR

EXCESS LIAR
DED X ''. RETENTIO

WORKERS COMPENSATION

AND EMPLOYERS' LIABILITY

ANYPROP RIETOR/PARTNERIEXECUTI V E

OFFICER/MEMBER EXCLUDED,
(Mandatory In NHI
II yes, YTTU,Ibe ,mdal
DESCRIPTION OF OPERATIONS Eel
Professional Liabllll
Cleans Made Form
OCCUR

CLAIMS -MADE

SBWBMSWFR
6/30/2925
6/30(2026

EACH OCCURRENCE

AGGREGATE
51,000,000
64WEGAGJCTV
6/30(2025
6/30/2026

PER OTH-
J, STATUTE ? ER .. .

L. EACH ACCIDENT $1,000,000
E.L. DISEASE -EA EMPLOYEE), $ 1,000 000
L. DISEASE -POLICY LIMIT 51,000000
07605124
/30002
gregete Llmi
$2,000,000
$4,000,000
DESCRIPTION OF OPERATIONS / LOCATIONS I VEHICLES IACORD 101, Add Diana' Remarks Schedule, may be attached If more space Is requited) AM Best's Rating of Policies above: A/XV or greater. The following policies are included in the underlying schedule of insurance for umbrella/excess liability:

General Liability/Auto Liability/Employers Liability. Professional Liability is E&O Liability.

Proof of coverages) for proposal purposes.

ERTIFICATE HOLDER
CANCELLATION 30 Day Notice of Cancellation
`Evidence of Insurance`

SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE

THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS.

AOTI RIZED REPRESESIJATIVE
ACORD 25 (2016/03)
O 1988-2015 ACORD CORPORATION. All rights reserved.

The ACORD name and logo are registered marks of ACORD
Pending Litigation and Insurance Section 6 109

Page 258 of 797 ends
Page 259 of 797 ends

Proposal for
Design, Architecture and Engineering Services for The Veterans Park Refurbishment and Restroom Renovation
RRM Project Pictured:

Neff Pork Improvements, La Mirada, CA
111

Page 260 of 797 ends

f Cw
t
David Norgard - Parks Operations Manager
Jennifer Campbell - City Manager
(Formerly Assistant City Manager and Director of Parks, Recreation, and Cultural Arts) David Norgard: (760)-633-2755, [email protected] Jennifer Campbell: (760) 633-2740, [email protected] C:it,rtr, City of Encinitas 1505 S. Vulcan Ave, Encinitas, CA 92024 Work and Services:
ra evarsa P arrieca) ,): Olympus Park, Encinitas, CA I 2017-2021:

RRM Design Group partnered with the City of Encinitas to transform a vacant 3.1 -acre site into Olympus Park, a vibrant community space. The park includes shaded fitness areas, multiuse basketball court, skate and bike park, therapeutic and botanical gardens, multiple picnic areas, a walking trail system, public art installations, Playground, and a community gathering space with lawn. RRM's collaborative approach with city departments and robust public engagement contributed to the park's award -winning success and high community usage.

Key Managers and Professionals:
• Jeff Ferber, Principal
• Amanda Seibel, Project manager
• Rachael Guraydin, Senior Landscape Architect
Jodi Rios - Associate Project Planner
Contact (714) 765-4901 l [email protected]
Client: City of Anaheim l City Hall, 200 S. Anaheim Blvd., Anaheim, CA 92805 Work and Services:

Relevant Project(s): La Palma Park, Anaheim, CAI 2019 -Present:

RRM Design Group collaborated with the City of Anaheim to develop the La Palma Green Promenade and Paseo, a community -focused project that enhances recreational opportunities and public space. The design process included extensive community engagement and resulted in features such as improved landscaping, a pedestrian promenade, shaded gathering areas, and a flexible -use lawn space elements that align closely with the Veterans Park RFP. RRM's successful work on the park, adjacent street, and parking lot demonstrates their ability to deliver integrated, multi -faceted public space improvements that reflect community needs and elevate quality of life.

Key Managers and Prot s.won as,.
• Mike Sherrod, Principal/Project Manager
• Amanda Seibel, Design Director
• Rachael Guraydin, Senior Landscape Architect
Cameron Luna - Associate Engineer
Css,itact, (951) 677-7751 l [email protected]
Ckentr City of Wilomar l 23873 Clinton Keith Road, Ste. 201, Wildomar, CA 92595 Work and Services:

Relevant P airs r(s): 27 Acre and 11 Acre Parks, Wildomar, CA I 2017 -Present:

RRM Design Group is leading the planning and design of two major parks in Wildomar, CA a 27 -acre regional park and an 11 -acre community park —both of which feature elements closely aligned with the Veterans 112 City of Sell Gardens I Proposal for i
Design, Architecture and Engineering Services for The Veterans Park Refurbishment and Restroom RPnnvatinn

Page 261 of 797 ends

Park RFP. The 27 -acre park includes a community building and amphitheater with lawn seating, therapeutic gardens, walking trails, shaded exercise stations, picnic areas, and interpretive educational features. The 11 --acre park master plan balances active and passive recreation with amenities such as multiple sports fields, a large agrarian-themed play space, shaded picnic pavilion, walking loop with workout stations, and a community building housing restrooms, locker rooms, and concessions. RRM's thoughtful integration of natural features, recreational infrastructure, and community input demonstrates their capacity to deliver inclusive, multi -functional public spaces.

Key Managers er' 3n{ Prot i ..na .
• Mike Sherrod, Principal/Project Manager • Tad Lupton, Architect • Rachael Guraydin, Project Manager • Noah Walters, Civil Engineer • Amanda Seibel, Assistant Project Manager • CordIan Maszk, Engineer II • Jeff Ferber, Principal Planner • Steve Webster, Supervisor of Surveying John Oskoui - Assistant City Manager (Former)
Contact (949) 350-9225 I [email protected]
Client: City of Downey 111111 Brookshire Avenue, Downey, CA 90241 Work and Services:

R4 ksr nt Project(s) Downey Measure S Park Improvement Projects Furman, Independence, Discovery Parks I 2018-2020:

RRM Design Group was selected by the City of Downey to prepare improvement plans for three neighborhood parks Discovery Park, Furman Park, and Independence Park delivering schematic design through construction documents within a compressed six-month timeline. Across the sites, RRM incorporated features that align with the Veterans Park RFP, including new restroom buildings, shaded picnic shelters with electrical connections, multi -sport courts, resurfaced basketball and tennis courts, upgraded fencing and backstops, fitness circuits, and enhanced landscaping. At Discovery Park, the addition of a synthetic turf soccer field and upgraded Musco Sports Lighting exemplifies RRM's ability to integrate durable, high-performance recreational amenities that serve diverse community needs.
r „tr
• Mike Sherrod, Principal/Project Manager
• Kayla Szubielski, Project Manager
• Amanda Seibel, Design Director
Jim Friedl - General Manager
(805) 495-6471 ( [email protected]
City of Thousand Oaks 1403 West Hilcrest Drive, Thousand Oaks, CA 91360 • Michael Doremus, Structural Engineer
• Diane Bathgate, Planning Principal
Work and Services:
t k an, Proj E s :: Paige Lane Neighborhood Park, Thousand Oaks, CAI 2017-2021 Paige Lane Neighborhood Park, funded by the Conejo Recreation and Park District and the City of Thousand Oaks, brings new recreational amenities to the community, including courts, a themed playground, fitness stations, and shaded picnic areas. The park connects to the larger Conejo Valley trail system and features sustainable design elements like drought -tolerant landscaping, permeable pathways, and preserved natural features. This collaborative project reflects community spirit and environmental stewardship while honoring local heritage.

Key A4 i x ,, e ., and
• Jeff Ferber, Principal/Project Manager
• Lance Wierschem, Manager of Landscape Architecture
• Michael Doremus, Structural Engineer
• Steve Webster, Supervisor of Surveying
Appendix Section 7 113

Page 262 of 797 ends

PUBLIC WORKS DEPART ENT
8327 GARFIELD AVEINUE. • BELL. GARDENS, CALIFORNIA '90201 6122 (562) 806..7770 FAX (562) 806-7789 • VWWV.BELLGARDENS.ORG

REQUEST FOR PROPOSALS DESIGN, ARCHITECTURE AND ENGINEERING

SERVICES FOR THE VETERANS PARK REFURBISHMENT AND RESTROOM

RENOVATION
ADDENDUM NO. 1
August 15, 2025,
This addendum is being issued for the REQUEST FOR PROPOSALS FOR DESIGN,

ARCHITECTURE AND ENGINEERING SERVICES FOR THE VETERANS PARK REFURBISHMENT AND RESTROOM RENOVATION ("RFP").

Submit a proposal with full understanding and full consideration of this addendum. This addendum is being issued to make the following changes:

A. The proposal submittal due date is hereby changed to Tuesday, September 16, 2025, at 5:00 p.m.

B. A mandatory pre -proposal meeting will be held on Thursday, August 28, 2025, at 2:00 p.m. at Veterans Park, located at 6662 Loveland Street, Bell Gardens, CA 90201. Attendance is mandatory. Prospective proposers must attend this meeting to be eligible to submit a proposal.

C. In the Submittal Procedure/Deadline section, the tentative schedule is hereby revised to read as follows:

I Release of RFP
Mandatory Pre -Proposal Meeting
Proposal Due Date
Proposer Interviews (if necessa
** Tentative City Council
Recommendation of
Award/Agreement Approval
Thursday, July 31, 2025
Thursday, August 28 2025 at 2:00..m..

Tuesday, September 16, 2025 at 5:00 p.m.

Tuesday, September 30, 2025
Monday, October 13, 2025
*The schedule above is tentative and subject to change at the discretion of the City, with appropriate notice to prospective Proposers. Please check the Bell Gardens website for the latest updates at https://www.bellgardens.orgii- want-to/view-bids-rfps/rfps-andbids. All times posted are in pacific standard time (PST).
**Proposer must be available on Monday, October 13, 2025, in -person or virtually for a possible presentation to the City Council. 114 City of Bell Gardens I Proposal for
Design, Architecture and Engineering Services for The Veterans ParkRefurbishmentand RestroomP�^^

Page 263 of 797 ends

Addendum No. 1
RFP - Design, Architecture and Engineering Services for the Veterans Park Refurbishment and Restroom Renovation

Page 2 of 2 ends

Inform subcontractors and suppliers as necessary.

Sincerely,
Bernardo Iniguez
Director of Public Works/ Facilities
The proposer shall individually identify and acknowledge receipt of this addendum by signing and enclosing a copy of this form in his/her proposal submittal. Failure to do so may resultin disqualification of his/her proposal submittal. 9es%Y 114— I Jeff Ferber October 2, 2025
Signature of Proposer Date
RRM Design Group: Main Office: 32332 Camino Capistrano, Ste, 205, San Juan Capistrano, CA 92675 I Headquarters: 3765 South Higuera St., Ste. 102, San Luis Obispo, CA 93401 Proposer Firm Name and Address
Appendix I Section 7 115
Page264of797

TY
L

PUBLIC WORKS DEPART
ENT
8327 GARFIELD AVENUE E3ELL GARDENS, CALIFORNIA 902©1--6122 (562) 806.77'70 FAX (562) 806-7789 m tL\ E3FL I...GARDENS.ORG

REQUEST FOR PROPOSALS FOR DESIGN, ARCHITECTURE AND ENGINEERING

SERVICES FOR THE VETERANS PARK REFURBISHMENT AND RESTROOM

RENOVATION
ADDENDUM NO. 2
September 12, 2025,
This addendum is being issued for the Request For Proposals For Design, Architecture And Engineering Services For The Veterans Park Refurbishment And Restroom Renovation.

Submit a proposal with full understanding and full consideration of this addendum. This addendum is being issued to make the following changes:

A. The proposal submittal due date is hereby changed to Thursday, October 2, 2025, at 5:00 p.m.

B. In the Submittal Procedure/Deadline section, the tentative schedule is hereby revised to read as follows:

Release of RFP Tuesday August 12 2025
Deadline uestions Thursday, August 14, 2025, at 5:00 .m. ndato Pre -Proposal Meeting Thursday, August 28, 2025 at 2:00_p.m Proposal Due Date Thursday, October 2, 2025 at 5:00 p.m. I Proposer Interviews (if Week of October 13 — 16, 2025
necessary,
** Tentative City Council { Monday, October 27, 2025
Recommendation of
Award/A reement A proval
*The schedule above is tentative and subject to change at the discretion of the City, with appropriate notice to prospective Proposers. Please check the Bell Gardens website for the latest updates at https://www.bellgardens.org/i-want-to/view-bids-rfps/rfps-andbids . All times posted are in pacific standard time (PST).
**Proposer must be available on Monday, October 27, in -person or virtually for a possible presentation to the City Council.

C. Page 11 of the RFP has been replaced with the attached Revised Page 11. 116 City of Bell Gardens Proposal for id
Design, Architecture and Engineering Services for The Veterans Park Refurbishment and Restroom

Page 265 of 797 ends

Addendum No. 2
RFP — Design, Architecture And Engineering Services For the Veterans Park Refurbishment and Restroom Renovation

Page 2 of 8 ends

D. This addendum is being issued to incorporate the following Response to Request for Information No. 1 into the RFP:

RESPONSE TO REQUESTS FOR INFORMATION NO. 1

1. What portion of the total $5/8M funding is allocated specifically for design services?
A: The City has not specified a budget for design services. However, the City anticipates design costs will be approximately 7-12% of the total project budget..

2. Is there a projected construction budget for the project? A: The remaining project budget for the Veterans Park Refurbishment is $3,310,894, of which 80% is anticipated for construction.

3. Has any previous design or master planning work been completed for the park? A: The most recent renovation at Ross Hall took place in 1979 with the addition of the south wing.

4. Are there any drawings, records, etc. of any of the existing park improvements including underground utilities?
A: The most recent as-buillt plans are from the project that took place irn 1979, The Consultant is expected to perform full field investigation and survey.

Therefore, proposals must reflect both the scope of work and the costs associated with this task.

5. What is the square footage of the area within Ross Hall to be renovated? A: Ross Hall Auditorium is approximately 3,394 SF.

6. What is the year of original construction for the buildings? A: The building's original construction date is unknown at the building underwent a renovation in "19'"9.

However, the

7. What types of interior improvements are anticipated (e.g., ADA compliance, lighting, HVAC, plumbing, finishes, structural upgrades)? A: The scope of work is defined by the available budget. Due to the size and conditions of Ross Hall, non-structural improvements may be most appropriate to rn'taximize 'funding and create a more functional space. Interior improvements at Ross Hall may include finishes (flooring, paint, cabinetry, etc,) and ADA improvements for accessibility.

8. Are there existing drawings available?
A: The most recent as -built plans are frorn the project that took place in 1979.

Appendix Section 7 117

Page 266 of 797 ends

Addendum No. 2
RFP — Design, Architecture And Engineering Services For the Veterans Park Refurbishment and Restroom Renovation

Page 3 of 8 ends

9. Does the City foresee the same usage and programming for the future renovated Ross Hall Recreation Center & Cultural Center or are there new programs they foresee incorporating?
A: Ross Hall will continue with the same programming after the refurbishment project.

10. Is a potential visit to the site to tour the existing building (s) feasible or can we visit without scheduling with the City assuming that the building areas are accessible to the public?
A: Prospective proposers had the opportunity to walk the site during the mandatory pre proposal meeting held on August 28, 2025. Prospective proposers may also visit the site to view areas normally open to the public.

11. What assumptions should be made regarding structural work (e.g., no structural modifications)?
A: The City does not anticipate, the need for any significant structural modifications tor this project.

However, should a designer propose any enhancements that affect the building's structural framework, the designer will be responsible for providing a complete set of structr,rraal plans and pertinent calculations as part of the project.

12. Does the City have a report available for Ross Hall Recreation Center & Cultural Center regarding the presence of any hazardous materials? Should we include as part of our proposal?
A: The Consultant will be responsible for obtaining any necessary hazardous materials reports. Therefore, proposers must include the costs and tasks associated with these reports as part of their proposal.

13. Is the Senior Center building excluded from the scope of work? A: The scope of this project does not extend to improvements on the Senior Center building.

14. Should the existing restroom be renovated in place, removed and replaced, or relocated elsewhere in the park?
A: The City is considering designs that call for the removal and replece'lrnent of the existing restroom. Proposing to relocate the restroom is not necessary.

15. What is the approximate square footage of the existing restroom facility? A: The approximate square footage of the existing outdoor restroom building is 740 square feet, and the adjoining storage building is approximately 615 square feet, for a total of approximately 1,655 square feet.

16. Is the intent to renovate the existing structures, or would a complete replacement be preferred?
8 City of Bell Gardens Proposal for ri
Design, Architecture and Engineering Services for The Veterans Park Refurbishment and Restroom panr.vntinn

Page 267 of 797 ends

Addendum No. 2
RFP — Design, Architecture And Engineering Services For the Veterans Park Refurbishment and Restroom Renovation

Page 4 of 8 ends

A: The City' is considering designs that call for the removal and replacement of the existing restroom.

17. Would a prefabricated building for both structures be acceptable? A: It is the City's preference to replace the restroom with a site -built restroom facility.

18.Are as -built drawings available for these buildings? A: No as=builts are available for the restroom and storage building. The Consultant is expected to perform full field investigation and survey. Therefore, proposals must reflect both the scope of work and the costs associated with this task.

19. What type of splash pad system is envisioned (recirculating vs. potable -to -drain)? A: The incorporation of the splash pad is currently under review by the State grant agency. Should the splash pad remain in the scope, it would need to be in compliance with current regulations for splash pads.

20.Wth the new splash pad, there be a need for supporting facilities such as a building for the mechanical room, restrooms, or changing areas with indoor or outdoor showers in which we should account as part of our scope, shall we assume the splash pad will be located near the new restroom and that restroom will have space for all the necessary accoutrements for the splash pad? A: Please note that the incorporation of a splash is currently on -hold and should not be part of the proposal at this time.

21. Which permitting and regulatory agencies will the consultant be expected to coordinate with (e.g., LA County Health, AQMD, Regional Water Quality Control Board)?
A: It is the proposer's responsibility to identify all permitting and regulatory agencies required for their proposed scope. Their submission rnr.rst take into consideration a plan for all necessary coordination.

22. Will CEQA and/or NEPA documentation be handled by the City, or will it be part of the consultant's scope?
A: The Consultant will be required to handle all CEQA and/or NEPA documentation.

23. Should stormwater treatment/LID assumed to be triggered (via 5,000SF of added or modified impervious area) by this project?
A: Since none of the project components are within the category of a "priority project" under the MS4 NPDES Permit, post -construction storrrvwater treatment/LID is not anticipated.
24, Has the city already solicited community input or will that be the role of the consultant?
Appendix I Section 7 119

Page 268 of 797 ends

Addendum No. 2
RFP — Design, Architecture And Engineering Services For the Veterans Park Refurbishment and Restroom Renovation

Page 5 of 8 ends

A: The conceptual scope was developed after the City obtained the publlic's input in 2019.

25.Are any community meetings needed for the park improvements? A: No community meetings are required at this tome. However, the Consultant is expected to lead and coordinate any public (hearings, if required by agencies.

26. The RFP states new stadium lighting for the renovated baseball field, will any of the renovated sports courts (Basketball, Volleyball, Tennis or Futsal) need new lighting for night play?
A: Lighting for the basketball, tennis, and futsal courts are expected to be upgraded to energy -efficient and/or LED lighting as part of this project.

27. Baseball field lights, what is the existing system at the field, does the city want to replace the entire baseball field lights and electrical equipment? A: While some lighting upgrades were performed at Veterans Park in 2024, the scope of this project requires the incorporation of additional improvements to all areas that were not addressed in the first phase of the project.

The final scope of these additional lighting improvements will be determined and confirmed with the selected Consultant during the project kick-off stage.

28.Are there existing lights for the basketball court, will lights be needed for the basketball court?
A: Yes, the basketball court wiEl require lighting upgrades.

29.Are there existing lights for the tennis court, will lights be needed for the tennis court?
A: Four tennis court fixtures were completed in 2024. However, the selected Consultant may be required to incorporate additional lighting upgrades.

30.Are there existing lights for the volleyball court, will lights be needed for the volleyball court?
A: While some lighting upgrades were performed at Veterans Park in 2024, the scope of this project requires the incorporation of additional improvements to all areas that were not rddressed in the first phase of the project.

The final scope of these additional lighting improvements will be determined and confirmed with the selected Consultant during the project kick-off stage.

31.Are there existing lights for the futsal court, will lights be needed for the futsal court?
A: Yes, the futsal courts will require lighting upgrades.

32.Are there any improvements included to the existing area/walkway lights? 120 City of Bell Gardens I Proposal for Oil
Design, Architecture and Engineering Services for The Veterans Park Refurbishmentand Restroom Renovation

Page 269 of 797 ends

Addendum No. 2
RFP — Design, Architecture And Engineering Services For the Veterans Park Refurbishment and Restroom Renovation

Page 6 of 8 ends

A: rile some lighting upgrades were performed at Veterans Park in 2024, the scope of this project requires the incorporation of additional improvements to all areas that were not addressed in the first phase of the project.

The final scope of these add'it'ional lighting improvements will be determined and confirmed with the selected Consultant during the project kick-off stage.

33. New lighting for existing courts? If "yes" replacement of existing light fixtures or new poles and light fixtures?
A: Any new lighting upgrades would need to match the specification of the City - approved pole and fixture design.

34. Is lighting required at shade sails?
A: Shade sails will not require lighting.

35. The RFP mentions a stage and an amphitheater, can you please clarify if only a stage is needed, is a permanent or portable stage preferred? A: The City is looking for a permanent amphitheater.

36. If an amphitheater is needed, is a roof needed, clam style backing or shade structure roof?
A: Preliminary design does not account for a roof or share structure over the amphitheater.

37. What is the intended programing for the stage/amphitheater? A: The amphitheater will serve as the venue/stage to host community events, such as the Fiestas Patrias and the Spring Events.

38. Are lights, electrical plugs, audio/PA system needed for the amphitheater/stage? A: Powers and audio/visual connections will be required.

39. Is existing site main metered electrical service have enough spare capacity of improvements?
A: No, electrical service upgrades are needed.

40. Do they have any electrical as -built drawings?
A: Electrical as built are currently not available.

41. Please confirm whether the project scope outlined on page 11 should take precedence over the scope described on page 3.

A: The scope of work can be found in Section V. Please note the park features list has been revised and included in this Addendum.

42.Can the City provide a site plan to show the anticipated extends of the RFP scope of services with related square footage?
Appendix I Section 7 121

Page 270 of 797 ends

Addendum No. 2
RFP — Design, Architecture And Engineering Services For the Veterans Park Refurbishment and Restroom Renovation

Page 7 of 8 ends

A: Please refer to the updated map uploaded to the RFP's page on the City's website.. Ross Hall is approximately 3,394 SF.

43. Please clarify the exact scope of work for the renovation. Is it limited to finishes? Is there interior and exterior work? WII it include kitchen and bathroom as well? A: This project will focus on a targeted renovation of the auditorium (Ross Hall).

Finishes and Surfaces may include painting, 'flooring, ceilings. Lighting and Electrical may include LED lighting conversion, stage lighting, adding light fixtures to create visual interest, and lighting control system. Audio/visual elements and accessibility improvements are also anticipated.

44. If kitchen renovations are included, is it a commercial kitchen requiring health department approval?
A: Yes

45. Please clarify the extent and expected deliverables for the "comprehensive survey" including what documents the city will be providing for review versus what will need to be generated by the Consultant team. Please clarify what the expected deliverables are for base mapping and details? A: Deliverables include, but are not limited to, existing conditions plan, utility plans, site plan, architectural floor plans, elevations, hazardous materials report, and accessibility survey.

46.Are there any offsite improvements that are anticipated? A: No offsite improvements, such as sidewalk repairs and driveway aprons, are anticipated.

47. Is the City planning for all new landscaping, or will some areas remain? A: The City does not anticipate renovating the entire park's landscaping.

However, the Consultant will be required to incorporate landscape improvements in specific areas as part of the project.

48. What is the area of the park renovation?
A: The refurbishment project will mainly focus on Ross Hall, and green space areas in the parkk. Please refer to updated map for more information.

49. We are anticipating a design and consulting team composed of the following entities. Please let us know if there are additional consultants that the City anticipates being required. (Lists Architecture, Landscape, Structural, Mechanical, Electrical and Plumbing, Civil, CEQA, Cost Estimator) A: Consultant will be responsible for assembling the design team as it is entirely dependent upon the proposed scope. Proposers should exercise their professional judgment in identifying and including all necessary services to ensure the successful completion of the project.
122 City of Bell Gardens I Proposal for Oil
Design, Architecture and Engineering Servicesfor The Veterans Park Refurbishment and Restroom Renovation

Page 271 of 797 ends

Addendum No. 2
RFP — Design, Architecture And Engineering Services For the Veterans Park Refurbishment and Restroom Renovation

Page 8 of 8 ends

50.Are Cost Proposals to be submitted separately? If so, how many hard copies does the City want?
A: Please refer to Section IV . Submittal Proce.ures/Deadlines for information.

51. Section 1.2 (Scope of Work) of the sample agreement appears to be intended for "As -Needed" services. Can this section be modified to refer specifically to the Veterans Park project scope of services?
A: Please refer to Subsection 6. Additions or Exceptions under Section VI.

Proposal Format and Content Requirements.

Inform subcontractors and suppliers as necessary.

Sincerely,
Bernardo Iniguez
Director of Public Works/ Facilities
The proposer shall individually identify and acknowledge receipt of this addendum by signing and enclosing a copy of this form in his/her proposal submittal. Failure to do so may result in disqualification of his/her proposal submittal.

I Jeff Ferber October 2, 2025
Signature of Proposer Date
RRM Design Group: Main Office: 32332 Camino Capistrano, Ste. 205, San Juan Capistrano, CA 92675 J Headquarters: 3765 South Higuera St., Ste. 102, San Luis Obispo, CA 93401 Proposer Firm Name and Address
Appendix Section 7 123

Page 272 of 797 ends

to any person for influencing or attempting to influence an officer or employee of any agency, a Member of Congress in connection with this Federal contract, grant, loan, or cooperative agreement, the consultant shall complete and submit Standard Form-LLL, "Disclosures Form to Report Lobbying", in accordance with its instructions.

C. The consultant shall require that the language of this certification be included in all subcontracts and that all subcontracts shall certify and disclose accordingly.

V. SCOPE OF SERVICES
The primary goal of this RFP is to solicit proposals from qualified consultants who can provide the City with the professional design, architecture and engineering services for the Veterans Park Refurbishment and Restroom Renovation.

Veterans Park Refurbishment and Restroom Renovation
The purpose of the project is to improve the existing infrastructure in the park.

As part of this project, the City has recently installed an outdoor fitness center and new LED lighting. The selected consultant will be responsible for the design of the following features:
• Local resource for regular recreation classes, festivals, and programming. • Shade sail over outdoor exercise equipment
• Improve comfortable seating for visitors.
• Community stage with lawn.
• Park with two passive, therapeutic gardens with signage. • Improved restroom facility (Building will not be relocated) • Park with two picnic areas with flat, smooth table surfaces. • Park with walking trail and mile markers, incorporating the closed road between the hard courts and skate park.
• Add shade structures to two basketball, two tennis, futsal, and volleyball courts. • Add lighting and shade structure to baseball field.
• Improve interior of Ross Hall Recreation Center & Cultural Center. • Improve landscaping
As a separate project, the selected consultant will perform the following:
• Renovation of bathroom building; and
• Renovation of storage building.

The consultant will provide project design services and construction support. The consultant's design staff shall have at least five (5) years of experience of providing design and construction support services to municipalities in California and have performed these services for California municipalities within the past twelve (12) months. Plans, specifications, engineering reports and/or studies must contain a valid registered professional engineer/architect stamp from consultant's staff, who shall be registered professionals in the State of California. The consultant's tasks will include, but are not limited to, the following:

REVISED 11-R
124 City of Bell Gardens Proposal for
Design, Architecture and Engineering Services for The Veterans Park Ref urbishment and Restroom RPnnvntinn

Page 273 of 797 ends

en du

ITY F LL

PUBLIC WORKS DEPARTMENT
8327 GARFIELD AVENUE • BELL GARDENS, CALIFORNIA 9©2_01-6122 (562) 806-777€7 FAX (562) 806-7783 + .BIELLGARUEINS.ORG

REQUEST FOR PROPOSALS FOR DESIGN, ARCHITECTURE AND ENGINEERING

SERVICES FOR THE VETERANS PARK REFURBISHMENT AND RESTROOM

RENOVATION
ADDENDUM NO. 3
September 29, 2025
This addendum is being issued for the Request For Proposals For Design, Architecture and Engineering Services for the Veterans Park Refurbishment and Restroom Renovation.

Submit a proposal with full understanding and full consideration of this addendum. This addendum is being issued to make the following changes:

A. This addendum is being issued to incorporate the following Response to Request for Information No. 2 into the RFP:

RESPONSE TO REQUESTS FOR INFORMATION NO. 2
1, Q: The RFP lists the Fee Proposal in the Evaluation Criteria. California State law mandates all state and local agencies apply Qualifications -Based Selection (QBS) procedures when hiring design professionals. Will the City revise the Evaluation Criteria to remove fee from the criteria?
A: Evaluation criteria are primarily qualification -(based, with 90 points of the total available score c eciicated to the firrnts qualifications, experience, and technical approach. The Fee (Proposal evaluation accounts for only 'i0) points of the total score.

2. Q: Given that the facilities are existing, do you anticipate that the project will be exempt from CEQA?
A: Depending on the proposed scope, proposers should exercise their professional judgment in identifying and including all necessary services to ensure the successful compietion of the project

3. Q: What events are hosted in the park?
A: Ross Hall offers a space for special events, celebrations or meeting c;. it is used as the City's event hall. Veterans Park is utilized to host community events, sirch as the Fiestas Patrias and the Sprint) Events. The park also serves Zis the City's cooling center,

Page 1 of 3 ends

Appendix I Section 7 125

Page 274 of 797 ends

Addendum No. 3
RFP — Design, Architecture And Engineering Services For the Veterans Park Refurbishment and Restroom Renovation

Page 2 of 3 ends

4. Q: What recreational tournaments are held in the park? A: Softball tournaments are held at this park. Other sports amenities are open to the public.

5. Q: What are the project limits?
A: The scope of work is defined by the available budget. Pease refer to the revised scope of work in Addendum No. 2 for details.

6. Q: Does the City have an arborist on -staff to assist with the project? A: Arboricultural support ffor the project will be provided on an as needed basis by the City's contracted tree maintenance service provider.

7. Q: The following link in the RFP is unavailable: '"'*The schedule above is tentative and subject to change at the discretion of the City, with appropriate notice to prospective Proposers. Please check the Bell Gardens website for the latest updates at https://www.bellgardens.org/i-want-to/view-bids-rfps/rfps-andbids . All times posted are in pacific standard time (PST).". Can the City provide a working link for latest updates?
A. Pease use the following link_ htlps://w .©rq/i.want-to/veew:hicis•m:
rfps/rfps-and t�ids.

8. Q: To confirm our understanding of Section 3 — Minimum Qualifications, Prior Related Experience, and References: If our selected case studies include all the required reference information (i.e., project description, time period, client contact details, and key personnel), can these case studies serve as both the demonstration of prior experience and fulfill the reference list requirement? Or is a separate, standalone reference list still required in the appendix, even if the case studies already contain this information?"
A: It is the City's preference to have a separate section for references.

9. Q: Are there any offsite improvements required on the perimeter streets? A: Please see Question 46 in the Response to Requests for Information No, 1, included in Addendum No, 2.

10.Q: Can the City provide record drawings for perimeter streets, infrastructure and utilities, and on -site irrigation?
A: Please see Question 4 in the Response to Requests for Information No, 1, included in Addendum No, 2.

11.Q: What are the extents of the renovations of Ross Hall Recreation and Cultural Center?
A: Please see Question 7 in the Response to Requests for Information No. 1, included in Addendum No. 2.
126 City of Bell Gardens ( Proposal for ;ail
Design, Architecture and Engineering Services for The Veterans Park Refurbishment and Restroom

Page 275 of 797 ends

Addendum No. 3
RFP — Design, Architecture And Engineering Services For the Veterans Park Refurbishment and Restroom Renovation

Page 3 of 3 ends

12. Q: What is the budget for the exterior landscape improvements? A. The total cost for these improvements will be defined by the design process and proposed scope.

13. Q: What is the budget for the interior building improvements? A: d he. total cost for these improvements will be defined by the design process and proposed scope.

14.Q: What portion of the total $5.78M funding is allocated specifically for design services?
A: Please see Question 1 in the II'tespoinse to Requests for information No. 1, included in Addendum No. 2.

Inform subcontractors and suppliers as necessary.

Sincerely,
Bernardo Iniguez
Director of Public Works/ Facilities
The proposer shall individually identify and acknowledge receipt of this addendum by signing and enclosing a copy of this form in his/her proposal submittal. Failure to do so may result in disqualification of his/her proposal submittal.

Jeff Ferber October 2, 2025
Signature of Proposer Date
RRM Design Group: Main Office: 32332 Camino Capistrano, Ste. 205, San Juan Capistrano, CA 92675 j'', Headquarters: 3765 South Higuera St., Ste. 102, San Luis Obispo, CA 93401 Proposer Firm Name and Address
Appendix Section 7 127

Page 276 of 797 ends

Creating
Environments
People
Enjoy•

Page 277 of 797 ends

f w m ry 4 Via,>'`" 1
Task 1: Project Initiation and Feasibility Phase
Subtask 1.01:

Subtask 1.02:

Subtask 1.03:

Subtask 1.04:

Subtask 1.05:

Exhibit "A" Scope of Services
Project Kickoff Meeting & Field Investigation
Background Data Collection & Review
Topographic Survey/Base Mapping
Geotechnical Investigation
CEQA Compliance
Task 2: Design Development Services
Subtask 2.01:

Subtask 2.02:

Subtask 2.03:

Subtask 2.04:

Conceptual Design Alternatives
Key Stakeholder Meetings
Final Schematic Plan
30% Design Development & Phasing Plan
Task 3: Construction Document Services
Subtask 3.01:

Subtask 3.02:

Subtask 3.03:

Subtask 3.04:

Subtask 3.05:
75% Draft Construction Documents
100% Draft Construction Documents
Permit Processing Assistance
Bid -Ready Construction Documents
LID Standard Manual Compliance Report
Task 4: Construction Support Services
Subtask 4.01:

Subtask 4.02:

Subtask 4.03:

Subtask 4.04:

Bidding Support
Construction Administration Support
Construction Observation
Record Drawings
Task 5: Project Coordination Services
Subtask 5.01: Project Coordination & Management
Subtask 5.02: Project Development Team Meetings
Subtask 5.03: QA/QC Review
Task 6: Optional Tasks
Subtask 6.01: Utility Mapping/Utility Coordination
C 1.71i,`ir z'f erit5 People' 'S',, ,t lh �a .w ..rndu,,ign. com San I uis Obisps . ;an 1 eancro I San -a Parnara i wvntcra I San kran Crap strand I San rrego: Secttla a Cal fcrr a cn-rc'atian . enr1.9rd Cifant Arc i:aat C!'1a773 pert r at-tac_in PF 7PFr Q F:tF„'. n'.yet.-ter. I -t` 7s61 = i'ffr y F=rt.P-. & 7RJ4

Page 278 of 797 ends

Veterans Park Renovation
Exhibit "A" Scope of Services

Page 2 of 15 ends

Subtask 1.01: Project Kickoff Meeting & Field Investigation RRM will conduct one (1) virtual kickoff meeting attended by the City's project management team, key Parks and Recreation staff, and key RRM team members will attend this meeting. Principally, this meeting will provide an opportunity to discuss and confirm the key park program elements as presented in the RFP and required by the grant.

Following the kickoff meeting, RRM and the project team will be available to walk the project site with City staff to discuss the project further and review it in greater detail. The site walk will provide an opportunity to inspect and photo log the existing facilities, including Ross Hall, amphitheater location, shade sail locations, sports courts, and landscape areas.

Deliverables:
• Prepare for and conduct one (1) virtual kickoff meeting and one (1) site walk • Meeting notes
Subtask 1.02: Background Data and Collection Review
RRM will collect from the city relevant project data for the design effort, including but not limited to:
• Existing improvement drawings for the park and historic structures • Record data
• City GIS databases
• City utility information and plans
• Recreation and event programming plans
• Underground and overhead utility plat maps and data
• Standard City details and specifications
• Sample bid documents (plans and specifications) from recent similar projects RRM's team will review this data for completeness and may request additional information from the City, as necessary, to analyze the project background and establish a database that will play a critical role in assessing all aspects of the park's design.

Deliverables:
• Collect and review relevant data as noted above.
• Compile data in a portable file for use by the Client and design team.

Subtask 1.03: Topographic Survey/Base Mapping
RRM will conduct survey work to create a base map file suitable for conceptual engineering and design work. The topographic survey work will include the following components:

Aerial Photo Control and Coordination

Page 279 of 797 ends

Veterans Park Renovation
Exhibit "A" Scope of Services

Page 3 of 15 ends

RRM will facilitate the coordination of aerial mapping with an aerial photogrammetrist. This task will include establishing horizontal and vertical survey control. Horizontal control will be based on California State Plane Coordinates. The vertical datum will be established from National Geodetic Survey monuments and will be North American Vertical Datum 1988. RRM's surveyors will coordinate with the photogrammetrist to obtain aerial photography suitable for compiling a topographic map at a scale of 1" = 20' showing contours at 0.5 -foot intervals with planimetric features, including detail on roads, structures, fences, power poles, trees, brush, and other aboveground features according to standard practice. The contour information on the aerial mapping will only be visible in the open areas. The areas obstructed by tree cover will not show contour information. Accuracy will equal or exceed national map accuracy standards for large-scale topographic maps compiled by photogramrnetric methods. The finished product will be available in a digital format compatible with AutoCAD Civil 3D.

Supplemental Topographic Survey
RRM will perform topographic surveying and mapping to supplement aerial photography. The collected data will be incorporated into a digital base map for use in the design. Topographic spot elevations will be taken to quality control the elevations shown on the aerial mapping. The horizontal and vertical datum will be based on the CCS83 (2011) State Plane Coordinates and NAVD 88 when suitable local agency datum's are unavailable
• Contours at one -foot intervals
• Footprints of existing buildings and other structures • Trees greater than 2" in diameter with trunk diameter (dbh) and canopy • Above ground evidence of utilities, location and invert at accessible storm drain manholes, inlets and sanitary sewer manholes, water valves, fire hydrants, light standards, electric boxes, valve boxes and power poles, including sidewalks, curb, gutter and mow curbs • Other features as required by the design team
Deliverables:
• Digital topographic map file in AutoCAD format.
• Digital Terrain Model
• Color digital orthophotos.

Subtask 1.04: Geotechnical Investigation
RRM's Geotechnical consultant, GPI, will prepare a geotechnical investigation report suitable for support of schematic planning and construction documents for Veterans Park in Bell Gardens. This will include review of readily available background materials and data including published geologic and seismic hazard maps, groundwater data, topographic maps, and geotechnical data. A site reconnaissance will be conducted to document the surficial geological conditions on site and mark proposed locations for clearance by site personnel and Underground Service Alert (USA).

Subsurface exploration will be accomplished through 8 exploratory borings drilled to depths of 10 to 20 feet (5 at 10 feet and 3 at 20 feet) below the existing grade. Two infiltration test wells will also be installed

Page 280 of 797 ends

Veterans Park Renovation
Exhibit "A" Scope of Services

Page 4 of 15 ends

to depths of 5 at locations requested by the Project Civil Engineer. The borings will be drilled with a track - mounted drill rig or hand -auger equipment and will be logged by our Engineer. Relatively undisturbed and bulk samples will be obtained at selected intervals from the borings. The soil samples will be transported to our City of Los Angeles and USA approved laboratory for testing. The geotechnical evaluation results will be compiled in a report providing findings, conclusions, and geotechnical recommendations for design and construction of improvements.

A geotechnical investigation report will be prepared illustrating the locations of borings, boring logs, and presenting laboratory analysis results. The report will include a general discussion of and geotechnical design recommendations for the structures planned (minor buildings, stage, light standards, retaining walls, fence/pole foundations, hardscape, and pavements). We will also include a conclusion on the suitability of the site for the proposed construction from a geotechnical perspective, description of geology and soils, seismic hazards, mitigations alternatives as appropriate, depth of groundwater, and infiltration rates.

Deliverables:
• Geotechnical Investigation Report
Subtask 1.05: CEQA Compliance
Improvements for Veterans Park would be considered a project under the California Environmental Quality Act (CEQA) and will require appropriate environmental compliance documentation. Article 19 of the CEOA Guidelines provides a list of classes of projects which have been determined not to have a significant effect on the environment and therefore can be exempt from the provisions of CEQA. The scope of work includes improvements in the park mainly to upgrade existing facilities such as the renovation of existing sports courts, and the renovation and relocation of a bathroom building and storage building. Other proposed enhancements include new gardens, picnic areas, a shade sails, lighting improvements, an amphitheater, and refreshed landscaping. Based on these assumptions, the project preliminarily appears to qualify fora Categorical Exemption through several categories including Class 1 (Existing Facilities), Class 2 (Replacement or Reconstruction), Class 4 (Minor Alterations to Land), and Class 23 (Normal Operations of Facilities for Public Gatherings).

RRM proposes to analyze the project for CEQA compliance and anticipates preparation of a Notice of Exemption (NOE) using the standard Notice of Exemption form contained in Appendix E of the CEQA Guidelines with a brief supporting analysis relying on existing available information. No new technical analyses are proposed. Within five days following the approval of park improvements, RRM will post the NOE with the County of Los Angeles County Clerk, and City staff will be responsible for posting the NOE at City facilities. In the event proposed improvements are more substantial and determined to potentially have a significant effect on the environment, RRM would outline needed strategies, and this task and budget would be reviewed and rescoped as needed.

Page 281 of 797 ends

Veterans Park Renovation
Exhibit "A" Scope of Services

Page 5 of 15 ends

Deliverables:
• Review of existing available, relevant documentation
• Notice of Exemption (NOE) completed form with brief supporting analysis Task 2: D
Subtask 2.01: Conceptual Design Alternatives
Based on the project data developed in Task 1 and the programming elements important to the city, RRM's team will prepare up to two (2) conceptual design alternatives for Veterans Park to explore various renovation possibilities. The alternatives will illustrate such things as the amphitheater, shade sails, therapeutic gardens, Ross Hall improvements, and other park amenities. The layout of the park will be communicated through color plan graphics to help communicate park's design. The draft alternatives will be presented as color plans, schematic in nature for clarity while allowing for efficient modifications and refinements. The alternatives will be given to RRM's construction cost estimator, OCMI, to provide conceptual level estimates for each plan. RRM will package the draft conceptual design alternatives for City input.

Deliverables:
• Two (2) conceptual design alternatives in plan format. • Supporting imagery boards to help illustrate vision and character. • Two (2) conceptual design cost estimates
Subtask 2.02: Key Stakeholder Meetings
RRM will host virtual individual and group meetings with key stakeholders. The purpose of these meetings is to provide further input and insight into key design amenities and features. Every reasonable effort will be made to meet with stakeholders unable to attend, at a later time, while maintaining the project schedule. City staff will be responsible for identifying and scheduling the stakeholder group. The list of potential stakeholders will be discussed at the project kickoff meeting, but may include City maintenance staff, recreational groups, Suva Intermediate School, Bell Gardens Boys and Girls Club, and neighbors of the project.

Deliverables:
• Three (3) virtual stakeholder meetings held via Microsoft Teams or Zoom • Summarizing memorandum
Subtask 2.03: Final Schematic Plan
Based on the feedback received from City staff and the key stakeholders, RRM will then update the preferred concept design alternative to the final schematic plan level for City review. The final schematic plan will illustrate the park's refurbishment design and layout aspects as follows:

Recreation Design

Page 282 of 797 ends

Veterans Park Renovation
Exhibit "A" Scope of Services

Page 6 of 15 ends

RRM's will develop an overall site plan focusing on the recreational hardscape features to illustrate the layout, character, and function of the stage and amphitheater, shade sails, court resurfacing, and therapeutic garden spaces. The site plan will also show how the park's new and upgraded aspects with be integrated with elements of the park that will remain. To help illustrate the draft schematic plan and convey the design intent, RRM will prepare a colored and labeled plan view for use in meetings and media posts.

Ross Hall
For Ross Hall, RRM will use the Owner provided existing conditions documents to develop the renovation into a Final Schematic Plan for the multi -use auditorium upgrades, kitchen renovations, and men's and women's restroom renovations. RRM will provide a labeled floor plan and preliminary code analysis.

Construction Cost Pro ection
Based on the draft schematic package, RRM's construction cost estimator will prepare a construction cost projection for all the site elements. The cost projection will be itemized following CSI format with supporting item descriptions and unit costs.

Deliverables:
• One (1) final color rendered and annotated final schematic plan • One (1) Ross Hall labeled final schematic plan
• One (1) Preliminary Code Analysis
• One (1) construction cost projection
Subtask 2.04: 30% Design Development & Phasing Plan
RRM will prepare a draft 30% design development plan that refines the Final Schematic Plan for the park and Ross Hall improvements. The plan will utilize information from the City and data obtained from the topographic survey and will indicate hardscape layout, site furnishings, shade structures and sails, court resurfacing, planting areas, lighting locations, stormwater BMPs, irrigation hydrozones, and the irrigation mainline location. For Ross Hall, expanding from the final schematic, the 30% Design Development Plan will include a Ross Hall demolition plan, floor plan, interior finish plan, interior elevations, and a materials board. The plan will be used to develop one (1) preliminary cost estimate and to confirm the improvements. Additionally, RRM will provide one (1) phasing plan for discussions with the city about future construction of the improvements.

Deliverables:
• 30% Draft Design Development Plan Set:
o One (1) Labeled Layout Plan
o One (1) Conceptual Planting Plan and Plant Palette
o One (1) Irrigation Hydrozone & Mainline Layout Plan
o One (1) Park Materials Board
o One (1) Ross Hall Demolition Plan
o One (1) Ross Hall Floor Plan
o One (1) Ross Hall Interior Finish Plan

Page 283 of 797 ends

Veterans Park Renovation
Exhibit "A" Scope of Services

Page 7 of 15 ends

o One (1) Ross Hall Interior Elevations Sheet
o One (1) Ross Hall Interior Materials Board
• One (1) phasing plan
• One (1) construction cost projection
Task 3: C o nstn ct'on Document Sr rvlc s
Subtask 3.01: 75% Draft Construction Documents
RRM's team will prepare 75% Construction Documents that address plan check comments generated from the City's review of the 30% Design Development submittal. Prior to submitting to the City, comments generated from RRM's QA/QC review team will be incorporated into the 75% construction document package. The 75% Construction Documents will be submitted to the City's Project Manager for distribution and plan -check.

Deliverables:
• One (1) PDF file 75% Draft Construction Document package • One (1) construction cost opinion
• 30% response to comments memo
Subtask 3.02:100% Draft Construction Documents
RRM's team will prepare 100% Construction Documents that address plan check comments generated from the City's review of the 75% Construction Document submittal. The 100% Construction Documents will be submitted to the City's Project Manager for distribution and backcheck.

Deliverables:
• One (1) PDF file 100% Construction Document package
• One (1) construction cost opinion
• 75% response to comments memo
Subtask 3.04: Permit Processing Assistance
RRM's team will work with the City project management team to process the improvement plans through the City's departments for plan check and permitting. The City will review and compile all agency comments into one set of comments for RRM to respond to. It is assumed that the City will resolve any conflicting comments prior to submitting to RRM. This scope assumes the following City permits will be required:
• Building and Safety Permit — Community Development Department • LA County Department of Public Health
• Golden/ Liberty Water District
• LA Fire Department
• Air Quality Management District
• Sanitation District
• LA County Waste Management
Page284of797

Veterans Park Renovation
Exhibit "A" Scope of Services

Page 8 of 15 ends

Deliverables:
• Prepare one (1) design package and submit to seven (7) permitting agencies with one (1) round of response to comments per agency
Subtask 3.05: Bid -Ready Construction Documents
RRM's team will prepare the Bid -Ready Construction Documents to address any backcheck comments generated from the City's review of the 100% Construction Document submittal. Once the final revisions are complete, one (1) signed reproducible Bid -Ready set of Construction Documents will be submitted to the City's Project Manager for final City/agency signatures and bidding.

Deliverables:
• One (1) signed reproducible Bid -Ready Construction Document package Subtask 3.06: LID Standard Manual Compliance Report
RRM will prepare a LID Standards Manual Compliance Report based on Los Angeles County's 2014 LID Standards Manual. The LID report will be developed to take advantage of any proposed site improvements to utilize low impact techniques to provide water quality treatment. Where possible, source control techniques will be proposed, low maintenance and simple solutions will be sought over proprietary BMP when possible. The LID report will be submitted to the city for review. It will quantify and describe the Post Construction BMPs to be used in the project. Based on the City's comments, RRM will revise the LID Report.

A project plan will be included, illustrating the project site, Drainage Management Areas (DMA's), and the location of BM Ps. Operations and maintenance procedures will be defined.

Deliverables:
• One (1) draft LID report
• One (1) final LID report
as 4: Constructic
Subtask 4.01: Bidding Support
RRM will assist the City during the bidding phase of the project. RRM will attend one (1) pre -bid conference job walk, respond to Requests for Clarifications (RFC) as determined by the City to be reasonable or necessary for the bidding process. Bidder questions will be received and sorted by the City, with applicable questions forwarded in writing to RRM's team for response back to the City in writing.

Deliverables:
• Prepare for and attend one (1) pre -bid conference job walk • Plan clarification response documents
Subtask 4.02: Construction Administration Support
RRM's team will support the City during the anticipated 365 -calendar day (12 -month) construction duration. RRM will attend one pre -construction conference and review and respond to Requests for

Page 285 of 797 ends

Veterans Park Renovation
Exhibit "A" Scope of Services

Page 9 of 15 ends

Information (RFI), Change Orders (CO), submittals, and contractor -supplied shop drawings. Under this task, RRM will also prepare and issue Supplemental Instructions as necessary to clarify design intent. RRM will also coordinate with City staff as necessary. We assume the City's project manager will filter and respond to straightforward RFIs directly to the contractor.

Deliverables:
• Prepare for and attend one (1) pre -construction conference • RFI, CO, submittal reviews, shop drawings responses, supplemental instructions, and general record -keeping documents
Subtask 4.03: Construction Meetings and Observation
RRM's Project Manager will prepare for and attend up to seven (7) field observation meetings throughout the anticipated 365 -calendar day (12 month) construction period to observe construction progress.

These site visits and observations are not intended to be an exhaustive check or a detailed inspection of the Contractor's work, but rather are to allow RRM to become generally familiar with the work in progress and to determine, in general, if the work is proceeding in accordance with the contract documents. RRM's design team shall not supervise, direct, or have control over the Contractor's work, nor have any responsibility for the construction means, methods, techniques, sequences, or procedures selected by the Contractor, nor for the Contractor's safety precautions or programs in connection with the work. These rights and responsibilities are solely those of the Contractor in accordance with the contract documents.

Furthermore, the Contractor shall be responsible for notifying RRM in a timely manner to schedule these field observation meetings. RRM's team shall not be responsible for any acts or omissions of the Contractor, Subcontractor, any entity performing any portion of the work, or any agents or employees of any of them.

RRM does not guarantee the performance of the contractor and shall not be responsible for the Contractor's failure to perform work in accordance with the contract documents or any applicable laws, codes, rules, or regulations. Due to the indeterminate nature of the construction observation requests, this task includes budget for meeting quantity stated above. If more construction observation requests are received, they are to be authorized by the City as additional work.

Deliverables:
• Prepare for and attend seven (7) construction observation meetings (final observation to include a preliminary punch list)
• Field notes and photo documentation
Subtask 4.04: Record Drawings
Upon completion of construction work, RRM will compile and deliver to the City a reproducible set of record drawings based upon the marked -up as -built drawings, addenda, change orders, and other data furnished by the Contractor. These record drawings will show significant changes made during construction. RRM will provide record drawings in PDF format. Revised CAD drawings are excluded from this exercise. Because these record drawings are based on unverified information provided by a third -party, which RRM shall

Page 286 of 797 ends

Veterans Park Renovation
Exhibit "A" Scope of Services

Page 10 of 15 ends

assume will be reliable, RRM cannot and does not warrant their accuracy. RRM will develop a "composite utility map" PDF markup of all utilities for the City's reference and convenience.

Deliverables:
• One (1) reproducible PDF set of record drawings based on contractor provided as-builts Task
ct Coordination Sere
Subtask 5.01: Project Coordination and Management
RRM's project manager will coordinate with City and design staff, utility companies, resource agencies, sub - consultants, and other agencies as necessary on an on -going basis throughout the project's lifecycle. This task also includes project schedule creation and maintenance as tasks are completed, document review, and day-to-day project coordination efforts including general correspondence and telephone conferencing as required to support City staff during the Project's development.

Deliverables:
• Memos, meeting minutes, and general correspondence for document control, compiled in electronic file form
• Project schedule creation and maintenance
Subtask 5.02: Project Development Team (PDT) Meetings
RRM's project manager, and appropriate team member(s) as the subject matter dictates, will prepare for and attend up to eight (8) virtual PDT meetings with the Client team through the duration of the project.

These meetings will provide an opportunity to collectively review, discuss, and clarify any design issues so that work may proceed in an efficient manner, and to plan out the community meetings.

Deliverables:
• Prepare for and facilitate up to eight (8) virtual PDT meetings • Prepare and distribute meeting notes
Subtask 5.03: QA/QC Review
At the 75% and 100% construction document milestones, RRM will conduct an internal QA/QC review.

RRM assigns an in-house QA/QC manager who is not a part of the design team. Using RRM's QA/QC checklist, a QA/QC team that is not part of the design team will review the project to ensure disciplines are fully coordinated, key information is included, references point to the correct location, and specifications tied into the drawings. This review, and corrective measures, will occur prior to each package (75% & 100%) being submitted to the City.

Deliverables:
• QA/QC review comments incorporated into the 75% Draft Construction Document package • QA/QC review comments incorporated into the 100% Draft Construction Document package

Page 287 of 797 ends

Veterans Park Renovation
Exhibit "A" Scope of Services

Page 11 of 15 ends

'Task 6„ 't''
Subtask 6.01: Utility Mapping/Utility Coordination
RRM's utility consultant, Certerra Subsurface — Cbelow, will conduct a comprehensive utility investigation of Veteran's Park to determine all utilities that run through the park. Certerra will exhaust all utility locating methods to identify the horizontal and vertical locations of utility lines, including reviewing existing as -built mapping and on -site reconnaissance field walk. Equipment used during the investigation will include electromagnetic locator, locatable CCTV push camera, ground penetrating radar, locatable duct rodder, crawler camera and lateral launch equipment. Certerra will provide utility locations along with depth estimates in the field.

Once the data has been collected, Certerra will provide a comprehensive two-dimensional utility map in AutoCAD and PDF to be added to the base map.

Deliverables:
• Utility location markers and depth estimates on the park site • AutoCAD and PDF file of utility locations
• Existing electrical infrastructure is adequately sized to accommodate the revised design loads. No changes to the existing electrical system (panels, transformers, main distribution) are required. • Existing water pressure is adequate.
• EV charging station design is not required.
• Natural gas is not required for the design.
• RRM can coordinate with the City -contracted arborist regarding work adjacent to large existing trees • City will provide access to all areas for the site assessment visit. This includes access to mechanical, plumbing, and electrical equipment.
• One contact person who will serve as the City's representative and will consolidate all Agency review comments for each submittal milestone into one (1) list of official comments to which RRM can respond • City will provide list of project stakeholders and scheduled times for meetings • City will coordinate building department review and agency compliance at 90% CD Submittal • Document distribution for technical reviews, bidding, and construction • City will provide bid and contract "boilerplate" documents, such as invitation, instructions, general and special conditions, contract forms, insurance, forms, etc. • City will commission a Landscape Irrigation Audit Report, performed by a third -party professional separate from RRM, in accordance with the State's Model Water Efficient Landscape Ordinance. • City will provide title reports for the park property. • City will provide record drawings for analysis for the building and site, including MEP systems.

Page 288 of 797 ends

Veterans Park Renovation
Exhibit "A" Scope of Services

Page 12 of 15 ends

I dons
Please note that the tasks to be performed by the RRM team are limited to those outlined above. This scope of services excludes the following:
• Independent verification of the accuracy of City provided information • Public outreach
• Presentations to City Council
• Independent verification of accuracy of City -provided information • Green building programs (e.g. LEED, Sites, Greenpoint) • Preparation of the SWPPP and SMARTS registration (Contractor's responsibility). • Arborist Report
• Environmental, Cultural, and Biological services
• Irrigation system audit
• Off -site utility analysis
• Repair to utilities encountered during geotechnical investigations not marked by Underground Service Alert (USA) or shown on plans provided by the City.
• Payment of fees (e.g., title report, permit, processing, noticing, plan check, etc.) • Design of specialized foundation/structural systems other than conventional slab on grade and spread footings
• Easement/dedication/annexation exhibits
• Fagade renovations for the buildings on -site
• Interior building renovations for buildings other than Ross Hall * Lighting improvements for baseball fields, volleyball courts, and memorial * Existing electrical infrastructure is adequately sized to accommodate the revised design loads. No changes to the existing electrical system (panels, transformers, main distribution) are required. • Existing infrastructure for plumbing systems and water pressure is adequate and revisions are not required.
• Splash pad design, mechanical heating and A/C system, Fire alarm, telecommunication, solar panel, security system, and electric vehicle charging system and infrastructure design and coordination is not included as a part of this scope, but can be provided as an additional service. • Value Engineering (mechanical, plumbing and electrical services) • Preparation of separate bid packages and alternates (mechanical, plumbing, and electrical services) • Work associated with systems or components outside the work area is not included except if the system serves the area of work.

Any additional services that RRM Design Group is asked to perform over and above the tasks described above will be subject to a subsequent contract amendment. .C a $ j ` E TS
Title and Reference Sheets

Page 289 of 797 ends

Veterans Park Renovation
Exhibit "A" Scope of Services

Page 13 of 15 ends

RRM's team will prepare title sheets, as necessary, to convey pertinent general project information.

These sheets may include the project name, location, approval blocks, agency contact information, USA alert, bask of survey statement, list of abbreviations, and bid alternate instructions.

Demolition Plans
RRM's team will prepare demolition plans, at an appropriate scale, for structures and elements requiring removal to implement the park's design. The plans will locate, identify, and describe the removal items and provide instructions for the safe disposal of the demolished work. Additionally, the plans will indicate items to salvage or stockpile such as topsoil for later use in the planting area construction.

Erosion Control Plan
RRM's team will prepare Erosion Control Plans for the site depicting proposed construction BMP in conformance with the State Construction General Permit. The plans will include plan views with locations of proposed BMP, and details of the BMP.

Construction Keynote Plans
RRM's team will prepare construction keynote plans, at an appropriate scale, for the approved design.

The plans will present the overall park design layout with a keynoting system that identifies construction items, references to appropriate details, and drawing series directions.

Site Construction Details
As a companion to the construction plans, we will prepare details for the construction items illustrated on the site construction plans. The details will specify materials, dimensions, colors, and finishes.

Horizontal Control Plans
RRM will prepare horizontal control plans, at an appropriate scale, for the approved design. The plans will establish all horizontal control for the Project. The plans will also establish construction layout control points and establish a coordinate system for locating all site elements.

Grading and Drainage Plans
RRM's team will prepare grading and drainage plans, at an appropriate scale, for the approved design based on the topographic survey. The plans will build on the boundary and topographic information and will show all vertical control of the project elements, contour grading, spot elevations, and cut and fill estimates within the project site. The plans will detail drainage facilities within the park development area with supporting calculations performed for the sizing of new on -site pipes and inlets as outlined in the above task.

Site Utilities
RRM will prepare plan construction documents for domestic water service, fire water and sanitary sewer, storm drains (e.g., "wet" utilities) contained within the property, and connection to the main infrastructure as applicable. Water, sewer, and storm drain plans will include vertical and horizontal design information. RRM assumes adequate service and capacity for the wet utilities. Electrical and gas are not included in this plan sheet (see site electrical below).

Page 290 of 797 ends

Veterans Park Renovation
Exhibit "A" Scope of Services

Page 14 of 15 ends

Ross Hall Plans and Details
RRM's architecture team will provide architecture plans, fixture and materials schedules, and details, at an appropriate scale for the renovation of the kitchen, auditorium and stage support rooms, and restrooms for Ross Hall. Improvements in these areas within Ross Hall will be brought to current accessible design standards.

Mechanical Plans and Details
RRM's team will prepare mechanical plans that show airflow calculations and drawings for the renovated Ross Hall which include new exhaust hood and fans in the kitchen and restrooms. Mechanical details and equipment will be included. Existing building systems will be integrated into existing control systems if available.

Plumbing Plans and Details
RRM's team will verify the adequacy of existing systems using plumbing load calculations for domestic water and waste. Drawings will provide ADA compliant fixture and equipment selections, plumbing renovation plans with fixture locations, and sewer and vent connections, and riser diagrams with associated fixture unit valves for water and waste. Plumbing details and schedules will also be included.

Site Electrical Plans and Details
RRM's subconsultant, P2S, will prepare site electrical plans using documented electrical equipment and services, develop electrical distribution system and prepare electrical single -line diagrams. The plans will include the following upgrades for Ross Hall: LED lighting, occupancy sensors, outlets, power and furnish electric stove, oven, hood, microwave, commercial grade refrigerator and freezer, ice maker, food warmer, dedicated circuits, exhaust fans, and power for mechanical equipment. For the exterior park improvements, P2S will provide outlets at the stage, the irrigation controller, and LED lighting at the sports courts.

Electric and gas utility trench locations will be shown schematically based on coordination with a specialty sub -consultant and/or utility service provider. The plans shall be subject to final utility company handout drawings (prepared by others as deferred submittals). We assume adequate service for this project is available directly adjacent to the project frontage,
Irrigation Plans and Details
RRM will prepare irrigation plans, calculations and document package for planting areas in compliance with the State's Model Water Efficient Landscape Ordinance MWELO, The plans will detail such things as the irrigation system layout, main line, automatic weather sensing controller, head layout, piping, filter, and backflow device. In support of the irrigation plans, we will prepare irrigation details that specify the method of construction and proper irrigation system component procedures. Water use calculations will be provided in accordance with MWELO standards.

Planting Plans and Details

Page 291 of 797 ends

Veterans Park Renovation
Exhibit "A" Scope of Services

Page 15 of 15 ends

RRM's team will prepare planting plans for planting areas. The plans will show the layout of planting indicating plant species, quantity, size and location of all shrubs, ground cover and trees. The plans will indicate anticipated water use for each plant material and separate the planting areas into distinct hydrozone areas for efficient watering. In support of the planting plans, we will prepare planting details that specify the method of construction and proper planting procedures.

Specifications
RRM's team will prepare technical specifications (CSI Division 02 through 48 as applicable). This scope assumes the City will prepare all Division O0 and 01 general provision specification sections related to this project and assemble the specifications book.

Construction Cost Opinions
RRM's construction cost estimator will estimate construction costs at the 65%, 90% and 100% submittal levels. The detailed Construction Cost Opinion will be itemized with supporting item descriptions and unit costs. Due to many variables surrounding bidding and construction conditions, this opinion will not represent a guarantee that bids received, or actual costs of construction will be equal to the opinion.

Page 292 of 797 ends

Exhibit "B" Compensation
Cornpens. °Uorl: f2 r 1 ern
Task 1: Project Initiation and Feasibility
Subtask 1.01: Project Kickoff Meeting & Field Investigation Subtask 1.02: Background Data Collection & Review
Subtask 1.03: Topographic Survey/Base Mapping
Subtask 1.04: Geotechnical Investigation
Subtask 1.05: CEQA Compliance
Task 2: Design Development Services
Subtask 2.01:

Subtask 2.02:

Subtask 2.03:

Subtask 2.04:

Conceptual Design Alternatives
Key Stakeholder Meetings
Final Schematic Plan
30% Design Development & Phasing Plan
Task 3: Construction Document Services
Subtask 3.01:

Subtask 3.02:

Subtask 3.03:

Subtask 3.04:

Subtask 3.05:
75% Draft Construction Documents
100% Draft Construction Documents
Permit Processing Assistance
Bid -Ready Construction Documents
LID Standard Manual Compliance Report
Task 4: Construction Support Services
Subtask 4.01:

Subtask 4.02:

Subtask 4.03:

Subtask 4.04:

Bidding Support
Construction Administration Support
Construction Observation
Record Drawings
Task 5: Project Coordination Services
Subtask 5.01:

Subtask 5.02:

Subtask 5.03:

Project Coordination & Management
Project Development Team Meetings
QA/QC Review
Total Design Services
Estimated Reimbursable Expenses (see note 3)
Fixed Fee: $ 14,440
Fixed Fee: $ 3,425
Fixed Fee:$ 24,900
Fixed Fee:$ 21,525
Fixed Fee:$ 7,460
Fixed Fee: $ 9,343
Fixed Fee: $ 3,650
Fixed Fee: $ 27,596
Fixed Fee: $ 46,510
Fixed Fee: $ 179,035
Fixed Fee: $ 76,729
Fixed Fee: $ 4,600
Fixed Fee: $ 24,153
Fixed Fee: $ 18,440
Fixed Fee: $ 17,161
Fixed Fee: $ 64,340
Fixed Fee: $ 16,920
Fixed Fee: $ 11,134
Fixed Fee: $
Fixed Fee: $
Fixed Fee: $
11,200
7,190
13,720
Fixed Fee: $ 603,471
T&M NTE: $ 2,000
Notes:

1. Fixed Fee tasks will be billed as the work progresses until the task is completed and the total amount stated in the contract for the task is invoiced.

San I tas Obispo' SPaa,r I eanclo I Suess Barbara I "denn..ra l Sae Hal Cap strann I Sam e.qc: Seattle Cal f,3rr a cra-na-aticn • I earn as^d eaant .urrhi-ant C?&a73 • "a',:°1 tart Carnaaao r'F 76F97 • Steven. Web aTer. ,..5 7S61 • Iaffre, Ferhzr, I n.2•F#44

Page 293 of 797 ends

Veterans Park Renovation
Exhibit "B" Compensation

Page 2 of 2 ends

2. Not -to -Exceed (NTE) fee tasks will be billed as the work progresses until the task is completed and the total amount stated in the contract for the task is invoiced.

3.Reimbursable expenses include such things as document reproduction, plotting services, public meeting materials, company car mileage (current federal rate), lodging, travel, rental car, per diem for survey crew, and overnight delivery. Reimbursable expenses will be billed as incurred at cost plus 10%.

4. RRM may adjust any individual line -item amount within the total overall budget amount shown, with written approval of the City.

5. RRM reserves the right to adjust hourly rates on an annual basis.

Page294of797

.
`OOM
Exhibit "A" Scope of Services
Improvernents
Task 1: Design Development Services
Subtask 1.01: Preliminary Layout Plan & Client Confirmation Meeting Subtask 1.02: Draft Schematic Design Package
Subtask 1.03: 50% Design Development Package
Subtask 1.04: 100% Design Development Package
Task 2: Construction Document Services
Subtask 2.01:

Subtask 2.02:

Subtask 2.03:

Subtask 2.04:
75% Draft Construction Documents Package
100% Draft Construction Documents Package
Permit Processing Assistance
Bid -Ready Construction Documents Package
Task 3: Construction Support Services
Subtask 3.01:

Subtask 3.02:

Subtask 3.03:

Subtask 3.04:

Bidding Support
Construction Administration Support
Construction Observation
Record Drawings
Task 4: Project Coordination Services
Subtask 4.01: Project Coordination 8, Management
Subtask 4.02: Project Development Team Meetings
Subtask 4.03: QA/QC Review
Detailed ,`cope
4as.. ). a " .. 4b° y...tw De r,,..l4:.y# ₹S . ..vices
Subtask 1.01: Preliminary Layout Plan & Client Confirmation Meeting RRM will develop one (1) preliminary layout plan of the park restroom and storage facility building based on the City's requirements for the building. This plan will be drafted and labeled. This plan will then be refined in virtual consultation with City Staff at a confirmation meeting.

Deliverables:
• One (1) park restroom and storage facility preliminary layout plan &sCtC i nvirc-rf':l@ nts People L n . ••v ( 4v\ -,c4 cnncienr.risiii corn .dan .ris t'lhlspo 8..an I eanrso I Sa17,3 Parham I 'dentt.ra i Sal I:.ran Cap =trano I Sra C.er1i_ l ;with Csl frrra cn-no-atkan • R ecna'd tyrant xrc:hi-a .t CX,973 • icbert t:ama^=io PPT ?7 + ctE an'.dehrter, 7:161. leffre{ Farber_ 14 2444

Page 295 of 797 ends

Veterans Park Restroom Renovation
Exhibit "A" Scope of Services

Page 2 of 1 ends

Subtask 1.02: Draft Schematic Design Package
RRM will develop a draft schematic plan prepared at a level for presentation to the City staff. The draft schematic plan will include one (1) floor plan layout based on the program confirmation meeting results.

Based on the final floor plan layout, up to two (2) Interior elevations, up to two (2) building sections, and four (4) exterior elevations will be developed showing materials, roof profiles, building style, and colors for the restroom and storage building. Based on the schematic design package, RRM's construction cost estimator will prepare a preliminary order of magnitude construction cost projection for preferred design.

Additionally, RRM will work with the City to develop two (2) exterior perspective model views of the restroom and storage facility. Additionally, RRM will provide one (1) exterior colored elevation.

Deliverables:
• One (1) park restroom and storage building floor plan • Two (2) interior elevations
• Two (2) building sections
• Four (4) exterior elevations (one in each cardinal direction) • One (1) preliminary construction cost opinion
• Two (2) exterior perspective model views
Subtask 1.04: 50% Design Development Package
RRM will prepare a draft 50% design development plan that refines and polishes the design elements detailed in the Draft Schematic Plan for Veterans Park Restroom and Storage Facility building. The plan will utilize information from the City and will indicate demolition plan, floor plan, interior and exterior finish plan, interior and exterior elevations, and a materials board. The plan will be used to develop one (1) preliminary design development cost estimate.

Deliverables:
• 50% Draft Design Development Plan Set:
o One (1) Demolition Plan
o One (1) Floor Plan
o One (1) Interior Finish Plan
o One (1) Exterior Finish Plan
o One (1) Interior Elevations Sheet
o One (1) Exterior Elevations Sheet
o One (1) Interior Materials Board
• One (1) construction cost projection
Subtask 1.05: 100% Design Development Package
Building on the draft 50% Design Development Package, RRM will revise the drawings to a draft 100% Design Development Package level, appropriate for submittal to City agencies. The revised package will be used to update the cost estimate and to confirm the improvements.

Page 296 of 797 ends

Veterans Park Restroom Renovation
Exhibit "A" Scope of Services

Page 3 of 10 ends

Deliverables:
• 100% Draft Design Development Plan Set:
o One (1) Demolition Plan
o One (1) Floor Plan
o One (1) Preliminary Structural Plan Layout
o One (1) Interior Finish Plan
o One (1) Exterior Finish Plan
o One (1) Interior Elevations Sheet
o One (1) Exterior Elevations Sheet
o One (1) Interior Materials Board
• One (1) construction cost projection
Task Constsuctic i S Document Services
Subtask 2.01: 75% Draft Construction Documents Package
RRM's team will prepare 75% Construction Documents that address plan check comments generated from the City's review of the 100% Design Development submittal. The 75% Construction Documents will be submitted to the City's Project Manager for distribution and plan -check.

Deliverables:
• One (1) PDF file 75% Draft Construction Document package • One (1) construction cost opinion
• 100% DD response to comments memo
Subtask 2.02: 100% Draft Construction Documents Package RRM's team will prepare 100% Construction Documents that address plan check comments generated from the City's review of the 75% Construction Document submittal. Prior to submitting to the City, comments generated from RRM's OA/OC review team will be incorporated into the 100% construction document package. The 100% Construction Documents will be submitted to the City's Project Manager for distribution and backcheck.

Deliverables:
• One (1) PDF file 100% Construction Document package
• One (1) construction cost opinion
• 75% response to comments memo
Subtask 2.03: Permit Processing Assistance
RRM's team will work with the City project management team to process the improvement plans through the City's departments for plan check and permitting. The City will review and compile all agency comments into one set of comments for RRM to respond to. It is assumed that the City will resolve any conflicting comments prior to submitting to RRM. This scope assumes the following City permits will be required:

Page 297 of 797 ends

Veterans Park Restroom Renovation
Exhibit "A" Scope of Services

Page 4 of 10 ends

• Building and Safety Permit — Community Development Department • LA County Department of Public Health
• Golden/ Liberty Water District
• LA Fire Department
• Air Quality Management District
• Sanitation District
• LA County Waste Management
Deliverables:
• Prepare one (1) design package and submit to seven (7) permitting agencies with one (1) round of response to comments per agency
Subtask 2.04: Bid -Ready Construction Documents Package RRM's team will prepare the Bid -Ready Construction Documents to address any backcheck comments generated from the City's review of the 100% Construction Document submittal. Once the final revisions are complete, one (1) signed reproducible Bid -Ready set of Construction Documents will be submitted to the City's Project Manager for final City/agency signatures and bidding.

Deliverables:
• One (1) signed reproducible Bid -Ready Construction Document package Subtask 3.01: Bidding Support
RRM will assist the City during the bidding phase of the project. RRM will attend one (1) pre -bid conference job walk, respond to Requests for Clarifications (RFC) as determined by the City to be reasonable or necessary for the bidding process. Bidder questions will be received and sorted by the City, with applicable questions forwarded in writing to RRM's team for response back to the City in writing.

Deliverables:
• Prepare for and attend one (1) pre -bid conference job walk • Plan clarification response documents
Subtask 3.02: Construction Support
RRM's team will support the City during the anticipated 180 -calendar day (6 -month) construction period construction process. RRM will attend one pre -construction conference and review and respond to Requests for Information (RFI), Change Orders (CO), submittals, and contractor -supplied shop drawings and rough grading survey. Under this task, RRM will also prepare and issue Supplemental Instructions as necessary to clarify technical details and prepare preliminary and final punch lists. RRM will also coordinate with City staff as necessary. We assume the City's project manager will filter and respond to straightforward RFIs directly to the contractor.

Page 298 of 797 ends

Veterans Park Restroom Renovation
Exhibit "A" Scope of Services

Page 5 of 10 ends

Deliverables:
• Prepare for and attend one (1) pre -construction conference • RFI, CO, submittal reviews, shop drawings responses, supplemental instructions, and general record -keeping documents
Subtask 3.03: Construction Observation
RRM's Project Architect will prepare for and attend up to seven (7) field observation meetings throughout the anticipated 180 -calendar day (6 -month) construction period to observe construction progress.

These site visits and observations are not intended to be an exhaustive check or a detailed inspection of the Contractor's work, but rather are to allow RRM to become generally familiar with the work in progress and to determine, in general, if the work is proceeding in accordance with the contract documents. RRM's design team shall not supervise, direct, or have control over the Contractor's work, nor have any responsibility for the construction means, methods, techniques, sequences, or procedures selected by the Contractor, nor for the Contractor's safety precautions or programs in connection with the work. These rights and responsibilities are solely those of the Contractor in accordance with the contract documents.

Furthermore, the Contractor shall be responsible for notifying RRM in a timely manner to schedule these field observation meetings. RRM's team shall not be responsible for any acts or omissions of the Contractor, Subcontractor, any entity performing any portion of the work, or any agents or employees of any of them.

RRM does not guarantee the performance of the contractor and shall not be responsible for the Contractor's failure to perform work in accordance with the contract documents or any applicable laws, codes, rules, or regulations. Due to the indeterminate nature of the construction observation requests, this task includes budget for meeting quantity stated above. If more construction observation requests are received, they are to be authorized by the City as additional work.

Deliverables:
• Prepare for and attend seven (7) construction observation meetings (final observation to include a preliminary punch list)
• Field notes and photo documentation
Subtask 3.04: Record Drawings
Upon completion of construction work, RRM will compile and deliver to the City a reproducible set of record drawings based upon the marked -up as -built drawings, addenda, change orders, and other data furnished by the Contractor. These record drawings will show significant changes made during construction. RRM will provide record drawings in PDF format. Revised CAD drawings are excluded from this exercise. Because these record drawings are based on unverified information provided by a third -party, which RRM shall assume will be reliable, RRM cannot and does not warrant their accuracy. RRM will develop a "composite utility map" PDF markup of all utilities for the City's reference and convenience.

Deliverables:
• One (1) reproducible PDF set of record drawings based on contractor provided as-builts

Page 299 of 797 ends

Veterans Park Restroom Renovation
Exhibit "A" Scope of Services

Page 6 of 10 ends

Task, 4
Subtask 4.01: Project Coordination and Management
RRM's project manager will coordinate with City and design staff, utility companies, resource agencies, sub - consultants, and other agencies as necessary on an on -going basis throughout the project's lifecycle. This task also includes project schedule creation and maintenance as tasks are completed, document review, and day-to-day project coordination efforts including general correspondence and telephone conferencing as required to support City staff during the Project's development.

Deliverables:
• Memos, meeting minutes, and general correspondence for document control, compiled in electronic file form
• Project schedule creation and maintenance
Subtask 4.02: Project Development Team (PDT) Meetings
RRM's project manager, and appropriate team member(s) as the subject matter dictates, will prepare for and attend up to eight (8) virtual PDT meetings with the Client team through the duration of the project.

These meetings will provide an opportunity to collectively review, discuss, and clarify any design issues so that work may proceed in an efficient manner, and to plan out the community meetings.

Deliverables:
• Prepare for and facilitate up to eight (8) virtual PDT meetings • Prepare and distribute meeting notes
Subtask 4.03: QA/QC Review
At the 100% construction document milestone, RRM will conduct an internal QA/QC review. RRM assigns an in-house QA/QC manager who is not a part of the design team. Using RRM's QA/QC checklist, a QA/QC team that is not part of the design team will review the project to ensure disciplines are fully coordinated, key information is included, references point to the correct location, and specifications tied into the drawings. This review, and corrective measures, will occur prior to the 100% package being submitted to the City.

Deliverables:
• QA/QC review comments incorporated into the 100% Draft Construction Document package • Existing electrical infrastructure is adequately sized to accommodate the revised design loads. No changes to the existing electrical system (panels, transformers, main distribution) are required. • Existing water pressure is adequate.
• Natural gas is not required for the design.

Page 300 of 797 ends

Veterans Park Restroom Renovation
Exhibit "A" Scope of Services

Page 7 of 1 ends

• City will provide access to all areas for the site assessment visit. This includes access to mechanical, plumbing, and electrical equipment.
• One contact person who will serve as the City's representative and will consolidate all Agency review comments for each submittal milestone into one (1) list of official comments to which RRM can respond • Document distribution for technical reviews, bidding, and construction • City will coordinate building department review and agency compliance at 90% CD Submittal • City will provide bid and contract "boilerplate" documents, such as invitation, instructions, general and special conditions, contract forms, insurance, forms, etc. • City will commission a Landscape Irrigation Audit Report, performed by a third -party professional separate from RRM, in accordance with the State's Model Water Efficient Landscape Ordinance. • City will provide title reports for the park property. • City will provide record drawings for analysis for the building and site, including MEP systems.

V, Limitations i 3
Please note that the tasks to be performed by the RRM team are limited to those outlined above. This scope of services excludes the following:
• Independent verification of the accuracy of City provided information • Public outreach workshop and strategy
• Presentations to City Council
• Independent verification of accuracy of City -provided information • LEED/Sites/Greenpoint documentation and design
• Preparation of the SWPPP and SMARTS registration (Contractor's responsibility). • Utility analysis
• Geotechnical engineering
• Payment of fees (e.g., title report, permit, processing, noticing, plan check, etc.) • Design of specialized foundation/structural systems other than conventional slab on grade and spread footings
+ Easement/dedication/annexation exhibits
+ Facade renovations for the buildings on -site
• Existing electrical infrastructure is adequately sized to accommodate the revised design loads. No changes to the existing electrical system (panels, transformers, main distribution) are required. • Existing infrastructure for plumbing systems is adequate and revisions are not required. • Existing water pressure is adequate.
• A/V, solar panel, telecommunication, security systems, fire alarm, mechanical heating and a/c System Design is not included as a part of this scope, but can be provided as an additional service. • Value Engineering (mechanical, plumbing and electrical services) • Preparation of separate bid packages and alternates (mechanical, plumbing, and electrical services) • Work associated with systems or components outside the work area is not included except if the system serves the area of work.

Page 301 of 797 ends

Veterans Park Restroom Renovation
Exhibit "A" Scope of Services

Page 8 of 10 ends

Any additional services that RRM Design Group is asked to perform over and above the tasks described above will be subject to a subsequent contract amendment. (
Title and Reference Sheets
RRM's team will prepare title sheets, as necessary, to convey pertinent general project information.

These sheets may include the project name, location, approval blocks, agency contact information, USA alert, basis of survey statement, list of abbreviations, and bid alternate instructions.

Demolition Plans
RRM's team will prepare demolition plans, at an appropriate scale, for structures and elements requiring removal to implement the park's design. The plans will locate, identify, and describe the removal items and provide instructions for the safe disposal of the demolished work. Additionally, the plans will indicate items to salvage or stockpile such as topsoil for later use in the planting area construction.

Erosion Control Plan
RRM's team will prepare Erosion Control Plans for the site depicting proposed construction BMP in conformance with the State Construction General Permit. The plans will include plan views with locations of proposed BMP, and details of the BMP.

Horizontal Control Plans
RRM will prepare horizontal control plans, at an appropriate scale, for the approved design. The plans will establish all horizontal control for the Project. The plans will also establish construction layout control points and establish a coordinate system for locating all site elements.

Construction, Grading, and Drainage Plans
RRM's team will prepare construction, grading and drainage plans, at an appropriate scale, for the approved design based on the topographic survey. The plans will build on the boundary and topographic information and will show all vertical control of the project elements, contour grading, spot elevations, and cut and fill estimates within the project site. The plans will detail drainage facilities around the restroom and facility building area with supporting calculations performed for the sizing of new on -site pipes and inlets as outlined in the above task.

The construction, grading and drainage plans will also present the overall hardscape layout with a keynoting system that identifies construction items, references to appropriate details, and drawing series directions. RRM will prepare details for the construction items illustrated on the grading plans. The details will specify materials, dimensions, colors, and finishes.

Site Utilities
RRM will prepare plan construction documents for domestic water service, fire water and sanitary sewer, storm drains (e,g., "wet" utilities) contained within the property, and connection to the new restroom and storage facility. Water, sewer, and storm drain plans will include vertical and horizontal design

Page 302 of 797 ends

Veterans Park Restroom Renovation
Exhibit "A" Scope of Services

Page 9 of 1 ends

information. RRM assumes adequate service and capacity for the wet utilities. Electrical and gas are not included in this plan sheet (see site electrical below).

Park Restroom and Storage Building Plans and Details
RRM's architecture and structural team will prepare construction plans and details for one (1) park building which will include a restroom and storage facility. The construction documents will include exterior and interior plans, materials and systems specifications, Title 24 energy documentation, engineering reports, calculations, and details necessary to process the buildings through the Building Department.

Mechanical Plans and Details
RRM's subconsultant, P2S, will prepare mechanical plans that show airflow calculations and drawings for the new restroom and storage facility which will include new exhaust fans and louvers in the restrooms.

Mechanical details and equipment will be included. Existing building systems will be integrated into existing control systems if available.

Plumbing Plans and Details
RRM's subconsultant, P2S, will prepare plumbing plans for the new restroom and storage facility using plumbing load calculations for domestic water and waste. Drawings will provide ADA compliant fixture and equipment selections, plumbing plans with fixture locations, sewer and vent connections, and riser diagrams with associated fixture unit valves for water and waste. Plumbing details and schedules will also be included.

Site Electrical Plans and Details
RRM's subconsultant, P25, will prepare electrical plans for the new restroom and storage facility using documented electrical equipment and services, develop electrical distribution system and prepare electrical single -line diagrams. The plans will include the following upgrades: electric hand dryers, LED lighting, exterior mounted LED lighting, outlets, power for mechanical equipment, and an electric chain coiling door.

Electric and gas utility trench locations will be shown schematically based on coordination with a specialty sub -consultant and/or utility service provider. The plans shall be subject to final utility company handout drawings (prepared by others as deferred submittals). We assume adequate service for this project is available directly adjacent to the project frontage.

Specifications
RRM's team will prepare technical specifications (CSI Division 02 through 48 as applicable). This scope assumes the City will prepare all Division 00 and 01 general provision specification sections related to this project and assemble the specifications book.

Construction Cost Opinions
RRM's construction cost estimator will estimate construction costs at the 65%, 90% and 100% submittal levels. The detailed Construction Cost Opinion will be itemized with supporting item descriptions and unit

Page 303 of 797 ends
← All documents from this meeting