I
an ousavi, , PE, SP l S
Director of Design Services and NPDES Program Manager
Education
M.B.A. General', California State
Polytechnic University, Pomona
B.S. Civil Engineering, California State
Polytechnic University, Pornona
Registrations
Professional Civil Engineer:
California (#J91136)
Qualified SWPPP Practitioner (QSP)
!Qualified SWPPP Developer (QSD):
California 1#9113rJ)
Experience
Liltta Street and Eve Avenue Storm Drain Improvement I City of Lynwood, CA Project Manager. Conducted a field investigation to identify cause of flooding issue.
Drafted a hydrology and hydraulics report to identify issues and provided two solutions to alleviate flooding. Developed plans to address flooding through use of drywells and developed alternative plans to direct connect proposed storm tank to existing storm drain main line,
Connector Pipe Screen (CPS) I City of Belt Gardens, CA
Project Manager, Conducted a field investigation of all public and private catch basins citywide. Developed a GIS based log utilizing MS4front software. Developed plans and applied for permitting through LA county to retrofit Catch basins citywide by Installing CPS units. Hosted pre -construction meeting with contractor, city staff and LA county,
Gertrude Drive Street improvements I Ctryof Lynwood, CA Project Manager. Developed plans, specifications and estimate (PS&E) package for water improvement along Gertrude Drive. Designing 8 -in DIP Water Main complete with tees, service lines, water meters, water boxes, wedge gate valves, transition couplings, thrust blocks, reducers etc. Plans included asphalt and concrete repairs along with plan and profile for curb and gutter drainage.
Virginia Avenue Street improvements f (fry of Lynwood, CA Project Manager. Developed PS&E package for water improvement along Virginia Avenue. Designing 8 -in D.I.P Nlater Main complete with tees, service lines, water meters, water boxes, wedge gate valves, transition couplings, thrust blocks, reducers etc, Plans Included asphalt and concrete repairs along with plan and profile for curb and gutter drainage.
MMus Park Catch Basin Evaluation and feasibility Study 1 City of $eJ1 Gardens, C'r1 Project Manager. Responsible for alleviating severe flooding issue at Asmus Park by identifying issues through a field investigation and a hydrology and hydraulics analysis to identify volume of water needed to divert and treat. Developk.iid conceptual plans of dry wells at parks to recharge ground wate, Slauson Avenue Congestion Relief Improvement Project City of Huntington Park, CA
Project Manager, Responsible for hydrology and hydraulics analysis to diver t and treat runoff from two-mile long corridor along Slauson Avenue, Designed BMPs to treat runoff and make street into a green street, Ran 5ynchro Simulation for ten signalized intersections for LOS analysis, coordination and timing. Designed plans and specifications for signal system upgrades and street widening.
Infrastructure Engineers, .a Bowman company I Municipal Engineering Services l November 9, 2023 38
i are ousavi, , PE, [;SIP / + ;S
Director of Design Services and NPDES Program Manager
San Gabriel River [Bikeway Environmental Services arid Permits I City of 60Oo/in Park, CA
Engineering Supervisor. Responsible for developing and approving SWPPP so ail pollutants and their sources, including sources of sediment associated with construction site erosion and all other actiivities associated with construction activity were controlled, All discharges were identified and either eliminated, controlled or treated. BMPs selected that were effective and resulted in the reduction or elimination of pollutants in storm water discharges. Post -construction B'MPs were identified and installed during construction that were untended to reduce or eliminate pollutants after construction was complete. Developed methods to implement BMP inspection, visual monitoring, Rain Even Action Plan (REAP) and Construction Site Monitoring Program (CSMP).
NPDES Storm Water Program Inspection City ofBaldwin Pork, CA As required under the state's Regional Water Quality Control Board regulations and city ordinances permitting inspection programs, the City of Baldwin Park enlisted IE to conduct a routine visual inspection for -.lot-source pollution control. The goal of this inspection was to prevent the discharge of pollutants associated with business activities from entering the city's storm drain system. Aidan conducted all necessary inspections for the City of Baldwin Park and provided the appropriate reports.
NPDES Annual Report I City of Montebello, C4
Project Manager. As mandated by the Trash Total Maximum Daily Loads (TMDLs) for the Los Angeles river watershed, each city within the Los Angeles River watershed is required to submit a compliance report for the Los Angeles River trash TMDL to the Regional Water Quality Control Board. With the collaboration of engineering, code enforcement, building, street maintenance, planning and relevant contracted services, Aidzin developed the annual report for the city, identifying methods used to meet compliance as well as providing calculations for scientific justification, NPDES Storm Water Program inspection I CityofBaidwin Park, CA As required under the states Regional Water Quality Control Board regulations and city ordinances permitting inspection programs, the City of Baldwin Park enlisted infrastructure Engineers to conduct a routine visual inspection for point -source pollution control. The goal of this inspection was to prevent the discharge of pollutants associated with business activities from entering the city's storm drain system. Aidan conducted all necessary inspections for the City of Baldwin Park and provided the appropriate reports,
City Engineering NPDES Services I City of Montebello, CA Project Manager. Managed NPDES services for the Cities of Montebello and Bell Gardens. Attended various meetings and coordinate with 30+ cities in the same watersheds to reach pollution reduction milestones. Responded to ail requests made from the Water Board to client, cities. Handled all NPDES-related work for the city.
Infrastructure Engineers, a Bowman company I Municipal Engineering Services I November 9, 2023 - 39
Ai an uusavir A, PE, SP S
Director of Design Services and NPDES Program Manager
Coachella Grow Engineering Services, High Hampton I City of Coachelto, CA Designer Engineer. Designed and designated catchment areas on 11 -acre lot along with sizing and slope of pipe to divert water. Designed retention basin and dry -- wells to intercept runoff from catchment areas with intent to infiltrate the entire site's runoff. Developed hydrology and hydraulics report to summarize findings and method for grading plans and retention basin size per Riverside County and City of Coachella Design Standards. The main objective foe this project was designing a cannabis cultivation facility with parking and right of -way improvements.
Upgrade Water Well Na. 1 Pump Station I City of Bell Gardens, CA Engineering Supervisor. Responsible for hydrology and hydraulics analysis to divert and treat runoff from site. Provided recommendations for pipe size to divert water and 6MMPs to teat water. Drafted a report to include all analysis and recommendations. Developed a conceptual plan for the water well based on an analysis of required storage volume.
Traffic Signal Improvement at Olive Street and Phelan Avenue Intersection City of 8nldwTO Park, CA
Engineering Associate. Aldan prepared a signal warrant study for the intersection of Olive and Phelan per the city's request. Atter having} passed warrant requirements, Aldan had designed proposed improvements to make the intersection signalized.
The improvements included pavement rehabilitation, upgrading ramps to be ADA compliant, striping crosswalks and camera detection.
ATP Cycle 2, Unprotected Crosswalk Safety Enhancement Improvements I City°f Hrintingtan Park, CA
Associate Engineer. The city requested IE to revise and complete the current plans (39 sheets), specifications and estimates which had been prepared byTransTech.The scope included 22 intersection improvements for pedestrian accessibility and safety.
The city also requested IE to obtain E76 for construction since it has only obtained Preliminary Environmental Study (PES) certifications from Caltrans.To complete the E76 process,' the Right of Way certifications and request for construction was required before completion, this process took between 6-8 weeks after completion of the 100% PS&E documents.
Infrastructure Engineers, a I3owrnan company l Municipal Engineering Services November 9, 2023 40
Sha n ousav , SCE, P ,
Public Works Permit Management and Inspection
Education
M.S. Civil Engineering, California State
Polytechnic University, Pomona
B.S. Civil Engineering, California State
Polytechnic University, Pomona
Registrations
Professional Civil Engineer:
California (it91696)
Q5P / QSD: California (491690)
*Experience prior to joining the firm
SP i
Experience
Siauson Avenue Congestion Relief Improvement Project City of Huntington Pork, CA
Engineering Associate. Created traffic signal modification plans for six signalized intersections. Placed video detection equipment, updated cabinets and signal equipment, installed new conduits and conductors, new traffic signal poles at the intersections and prepared specifications and cost estimate.
Tlraffic SignalWarrant Analysis on Olympic Boulevard and Allston Street! Hereford Drive Intersection I City of Montebello, CA
Supervising Engineer. Responsible for creating the signal warrant report and verifying the warrant conditions satisfied on the CA-MUTCD. Designed a collision diagram, conducted an analysis on the collision history of the intersection and provided a field review of the existing conditions.
Engineering and Traffic Survey I City of Montebello, CA Supervising Engineer. Updated the engineering and traffic survey to determine the posted speed limits throughout the city, Conducted a field investigation, analyze SWiTRS data, create speed survey maps, analyze the speed and traffic data in accordance with the CVC code, and prepare a final report.
Pavement Management System (PMTS) Update Report City of Montebello, CA Supervising Engineer. Responsible for inspecting and creating an inventory of the conditions within the City of Montebello's roadway network. Work included generating excel inventory, creating a GIS map and database, preparing a five-year budget to raise the overall pavement condition Index within the city, and creating a comprehensive report.
All Way Stop Warrants at 6th Street and West Harding Avenue City of Montebello, CA
Supervising Engineer. Responsible for creating the ail -way stop warrant report and verifying the warrant conditions satisfied on the CA-MLITCD. Designed a collision diagram, conducted an analysis on the collision history of the intersection, and provided a field review of the existing conditions.
Corridor Traffic Study Along Lincoln Avenue Semen Wilcox Avenue and Montebello Boulevard I City of Montebello, CA
Engineering Associate. Prepared a traffic calming report throughout the Lincoln corridor. Analyze the existing peak hour intersection capacity and parking capacity, review three-year collision history and Intersection sight distance, evaluate vehicular speeds and calming measures, prepare future capacity analysis with conceptual roundabout design, and determine the future capacity of on -street parking, infrastructure (Engineers, a Bowman comparry i Municipal Engineering services ; November 9, 2023 Ott
Shawn ousavi, SCE, PE, SP / :S
Public Works Permit Management and inspection
All Way Stop Sign Warrant Analysis 4th Street and Mines Avenue City of Montebello, CA
Engineering Assistant. Responsible for creating the all -way stop warrant report and verifying the warrant conditions satisfied on the CA-MUTCD. Designed a collision diagram, conducted an analysis or, the collision history of the intersection and provided a field review of the existing conditions.
HSIP Cycle 7 Project - Various Intersections Improvements I City of Montebello, CA Engineering Assistant. Upgrade the signal hardware and improve signal timing for the three in tersections.This included changing the phase diagram to protective - permissive and relocating existing k -rails to improve traffic flow and safety.
Responsible for the deduct, specification, and cost estimate of the three traffic signal intersections.
Beverly Blvd Street Improvements Project I City of Montebello, CA Engineering Assistant- Responsible for preparing plans, specification, and cost estimates. Specific work included detailed field observations, design of necessary street improvements, implementing AC pavement and sidewalk repairs, updating ramps to become ADA compliant and maximizing use of federal funds, Arroyo Drive Street Improvements I Ciry or Montebello, CA Engineering Assistant, Responsible fur developing street cross section and base map; performed field reconnaissance to inspect and verify surface indications of utilities.
InfrastructureEngineers provided design, project management, bidding of contract; construction management and inspection, as well as federal fund administration For this project that involves removal of existing AC paving and paving of /AC pavement and concrete improvement reconstruction, including replacing existing curb and gutter, sidewalk, driveway approaches, access ramps, and adjustment of utility covers, traffic striping, markers, pavement markings and curb painting. The project runs from Arroyo Drive from A.stra Drive to Rose Glen Ave,
Infrastructure Engineers, a Bowman company Municipal Engineering Services November 9, 2023 42
Mike a heri, TE, PE
As -Needed Traffic Engineer
Education
Master of Public Sector Management
Leadership, California State University,
Northridge
I3S, Civil Engineering, Iowa State
University
Registrations
Professional Traffic Engineer:
California (01663)
Professional Civil Engineer:
California (047034)
Associations
Past Metro Sustainability Council
Member
Past MetroTDM &Sustainability
Committee Chair - 2019
Past Metro Transportation Advisory
Committee Member- 2019
Institute of Transportation Engineers
(IT E) member
Awards
2015 APA Outstanding Transportation
Planning Project, Measuring Mobility
in Pasadena beyond Auto LOS
2009 APA Planning Excellence for
Rest Practice, the Next Downtown, a
Sustainable Vision for Downtown Los
Angeles
"fxpeenence prior to joining the firm
Experience
City Traffic Engineer I City of Montebello, CA
As a member of Infrastructure Engineers, a Bowman company Mike serves as the City Traffic Engineer for the City of Montebello. He manages the daily activities of the Traffic Engineering Division. In this capacity, he is responsible for developing and managing the annual traffic division budget, securing federal funding from Caltrans for city projects, supervising the design and construction upgrade of the new traffic signals, and managing projects for major arterials in the city. In addition, he is responsible for reviewing traffic signal operations and new system design projects, overseeing the preparation of PS&E for new traffic signals and striping pkarns, developing new signal timing, reviewing traffic impact studies and scopes of work prepared by consultants, and plan checking traffic control plans.
Transportation Manager I City of Pasadena, CA*
Transportation Manager. Mike planned, organized, and directed the activities of the City of Pasadena Transportation Planning and Development Division including but not limited to: CIP, Metro Call for Projects, SCAG, and SCAQMD sustainable transportation grant projects, development review process, and VMT /VTtransportation impact analyses using city's transportation forecasting model, Administered city's Trip Reduction Ordinance (T O), and Transportation Demand Management (TDM) plan. Worked closely with the Planning Department and City Attorneys Office in preparing Draft Environmental Impact Reports (DEIR), and formulation of traffic -related 'response to tDEIR) comments" Represented the department at City Council, public meetings, city commissions / committees such as Planning Commission, Design Commission, and Transportation and Environmental Advisory Commission. Planned and prepared division's budget.
Department of Transportation, Bureau of Planning and Land Use Development City of Lo's Angeles, CA`
Transportation Engineer- Mike managed and supervised a team of engineering staff responsible for review of traffic studies / Environmental Impact Reports (EIRrr), Participated and interacted with developers and city officials in developing creative and practical solutions J improvements to mitigate project -related traffic Impacts - As point person, Mike coordinated site access and circulation design issues for 100 LAUSD's new schools in the Central, Southern and Hollywood areas with other department bureaus and other city agencies. He also prepared and submitted MTA Call for Project applications, and managed (ail projects for LADOT.
Department of Transportation, Bureau of Information services I City of Los Angeles, CSI'
Transportation Engineer, Mike managed and supervised a team of engineering staff responsible for review of traffic studies / Elks. Headed the Systems Development and Traffic Surveys Sections responsible for development of Geographic Information Infrastructure Engineers, a Bowman company I Municipal Engineering Services I November 9, 2023 43
Mike agheri, TE, PE
As -Needed Traffic Engineer
Systems (G15; -based applications to streamline department operations. Issued Request for Proposals (RFPs) and managed the department's Traffic Accident Information System IRIS) project. Secured funds from the Quality and Productivity Commission's Productivity Investment Fend to develop department Work Order Tracking System (WOTSj.
Department of Transportation, Bureau of Transportation Planning City of cos Angeles, CA*
Transportation Engineer. Managed and supervised a team of engineering staff responsible for review of traffic studies / EiRs. Managed and directed staff responsible for collecting, analyzing, and disseminating traffic data in support of the entire department. Planned and implemented a computer system for direct access to traffic data. Converted Sections business process to almost 90% paperless operation. Tested and evaluated new data collection systems for the Section resulting in acquiring more efficient data collection equipment (i.e., Nu -metric and Jaymar). Appointed by the General Manager as the department GIS coordinator.Trained more than 100 DOT staff In using and applying GIS technology in their daily work. In July 1995, prepared a technical report to plan and implement a department wide GIS-based work order system. Conductred depa rtment-wide MIS / GIS needs assessment survey and convened coordination meetings with representatives of all bureaus in the department.
Department of Transportation, Bureau of Transportation Planning I Cry ofLos Angeles, CA"
Transportation Engineering Associate. Reviewed and analyzed traffic impact studies for new developments in the city to ensure compliance with adopted transportation ordinances and DOT guide -lines, Evaluated adequacy of proposed measures to mitigate traffic impacts on the city's transportation system. Worked closely with Council offices,
Department of Transportation, Office of Transportation Operations - West 5an Fernando Valley Offices } City of t.ns Angeles, CA"
Transportation Engineering Associate. Reviewed and approved traffic engineering studies conducted by staff to install, remove, or modify traffic control devices on city streets. Recommended removal and / or installation of signs including parking signs, Worked closely with City Council offices, 1 APO, and other city agencies. Received appreciation plaque from Council District 12 for outstanding work.
Infrastructure Engineers, a Bowman company I Municipal Engineering Services I November 9, 2023 44
Jose (Ana
Water Engineer
Education
B.S. Mechanlcal Engineering, California
State University, Los Angeles
Certifications
Grade 5, Water Distribution Operator
(State Water Resources Control Board)
Grade 4, Water Distribution Operator
(State Water Resources Control Board)
"Experience prior to joining the firm
Experience
Infrastructure Engineers, a Bowman company I Brea, CA
Water System Consultant. While employed by IE, Jose has provided the services to the City of Bell Gardens.This includes oversight on the determination of PFAS contamination and analysis of an existing water well, Worked on a water quality improvement engineering study of the city's drinking water system. Assisted with the selection of the best available technology for P FAS treatment of a water well, Assisted with the water blending analysis of an existing water well and MWtl water for PFAS treatment. Oversaw the dynamic flow and chemistry profiling of one drinking water well. Oversaw the static and dynamic video camera survey of one drinking water well.
Oversaw the rehabilitation and modification of one drinking water well. Also, for the City of Glendora, Jose updated the water system cross -connection control program and prepared the city's annual water system report for the State Water Resources Control Board,
Safna Engineering & Consulting I Bermuda Dues, CA"
Water System Consultant. While consulting for Safna Engineering & Consulting, Jose provided many services to the Los Angeles County Department of Public Works Sativa Los Angeles County Water District. Jose served as the State Certified Chief Operator of Record and managed the daily operations and maintenance of the water system. Directed the operation of pumps, chemical dosage rates for wellhead, distribution residual maintenance, related flow, pressure control and storage facilities by using a System Control and Data Acquisition System (SCADA). Coordinated and oversaw the collection and analysis of various types of water samples from the water system according to procedures provided by the State Water Resources Control Board. Reported and communicated both verbally and in writing with the State Water Resources Control Board pertaining to reporting test results, production data, cross connection control corrective actions, and annual inspection of all faciiitles.
Prepared and submitted monthly, quarterly, and yearly water quality reports to the State Water Resources Control Board. Ensured compliance with federal, state, and county health and safety regulations, Prepared and oversaw the water system valve exercising program. Prepared and administered the water systern flushing program.
Supported the county's team with the water system Infrastructure design. Supported the Los Angeles County's team and contractors with the construction of new water mains and repairs of the existing water system. Oversaw the removal, rehabilitation, reinstallation, disinfecting and testing of domestic water wells. Supported the county's team with the construction of new back -tip water supplies with adjacent water purveyors. Assisted the county's team with the updating of the water system emergency response plan and emergency chlorination plan. Oversaw the updating of the risk management plan for two chlorine gas systems. Oversaw the conversion of two chlorination gas systems to two sodium hypochlorite chlorination systems.
Assisted with the preparation of the annual consumer confidence report .Oversaw Infrastructure Engineers, a Bowman company l Municipal Engineering Services November 9, 2023 45
Jose o!ina
Water Engineer
the installation of a SCADA. Oversaw the rehabilitation of two hycf ropneurnatic tanks, Assisted with the updating of the water systern map.
Waterworks Technology, Inc. I Los Angeles CA"
Water System Consultant. White consulting for Waterworks Technology, inc., Jose provided many services to the City of Lynwood Water Department. Jose assisted with the operation of pumps, chemical dosage rates for wellhead, distribution residual maintenance, related flow, pressure control and storage facilities by using a SCADA system. Oversaw the removal, rehabilitation, reinstallation, disinfecting and testing of domestic water wells. Supported the city's team and contractors with the construction of new water mains and repairs of the existing water system. Assisted with the preparation of plans and specifications for the rehabilitation of three water wells. Worked as project manager and inspector during the rehabilitation of three water wells. Reviewed plans and specifications for the construction of a new water well. Reviewed plans and specifications for the construction of a well treatment plant for the removal of IPCE and ICE, Reviewed plans and specifications for the installation of 'a new SCADA system.
Utility Services Manager I City of Lynwood, CA"
During his tenure in this position for the City of Lynwood, JQse oversaw the preparation of the Sewer System Master Plan and Sewer System Management Plan.
Planned, organized, and exercised direct supervision over specialized crews and equipment performing preventive and reactive maintenance to the wastewater collection systern. [valuated and managed maintenance programs to ensure efficiencies and quality standards were maximized, including: closed circuit television pipe inspection program, high velocity hydraulic pressure cleaning programs, root removal progrars, construction and repair of wastewater manholes and mainlines.
Developed and coordinated ongoing, on the job training, vendor and in-house training for all wastewater work tasks, Reviewed accident hazard reports and recommended corrective action. Oversaw emergency response and cleanup in the event of a sanitary sewer overflow or illicit discharge, documenting investigative_ findings and reporting to regulatory agencies as required. Evaluated and monitored the status and condition of wastewater infrastructure and equipment, recommending capital rc.piacements and improvements. Reviewed new development plans and specifications for compliance with city's standards. Jose supervised, directed and assigned duties to production personnel. Oversaw personnel activities, assured proper and adequate training, and managed their performance as needed through regular performance evaluations and coaching, Coordinated and oversaw the collection and analysis of various types of water samples from the water system according to procedures provided by the State Water Resources Control Board, Oversaw the investigation and answering of complaints to customers concerning water quality. Reported and communicated both verbally and in writing with the State Water Resources Control Board pertaining to reporting test results, production Infrastructure Engineers, a Bowman company I Municipal Engineering Services I November 9,.1023 46
Jose A.Molina
Water Engineer
data, cross connection control corrective actions and annual inspection of all facilities.
Oversaw cross connection control program. Inspected production facilities to ensure compliance with sanitary standards. Oversaw the pulling, resetting, rehabilitation, disinfecting and testing of domestic water wells. Directed the operation of pumps, chemical dosage rates for wellhead, distribution residual maintenance, related flow, pressure control and storage facilities manually or by using a SCADA system. Oversaw troubleshooting, maintenance, and improvements of SCADA system. Prepared specifications and cost estimates for capital improvement protects. Oversaw the design and construction of new water facilities and new treatment facility. Oversaw the preparation of the annual consumer confidence report. Ensured compliance with federal, state, and county health and safety regulations. Prepared budget for the operation, maintenance and capital improvement projects. Oversaw the emergency response team. Coordinated the preparation of design and construction plans with engineering staff. Insured the proper development and administration of work safety programs. Made recommendations on long-range capital Improvement protects.
Oversaw the rehabflitatlon of five water wells and the abandonment of seven water wells. Oversaw the preparation of plans and specifications for the Improvement of five water well sites and the installation of five electrical back-up generators. Oversaw the preparation of plans and specifications for the SCADA of the water system.
Oversaw the preparation of Water Master Plans and Water Management Plans, Oversaw the preparation of the bio-terrorism vulnerability assessment for the water distribution system.
Assistant Director of Public Works I Utility Services City of Lynwood, CA" Jose administered departmental activities in the absence of the Director of Public Works. Represented the Publiic. Works Department with residents and community groups as it related to the city's water, sewer, street lighting and traffic signal systems.
Provided general administrative, budgetary, engineering and management assistance to the Director of Public Works, Attended City Council meetings and met with the public as needed. Supervised and conferred with the utility division supervisors concerning the planning, scheduling, and assigning of operation, maintenance, repair and construction functions of the water; sewer, street lighting and traffic signal systems. Coordinated the preparation of design and construction plans with engineering staff. Made recommendations on long-range capital Improvement projects. Oversaw the development, training and evaluation of unit personnel.
Insured the proper development and administration of work safety programs, Infrastructure Engineers, a Bowman company Municipal Engineering Services November 9,2.023 47
Jay Shih, PE, CASp
Certified Access Specialist and Entitlement Review
Education Experience
Q.S. Major, Concentration, University or
institution Name
Registrations
Professional Engineer; Virginia
(11032887), West Virginia (#22.3S3)
Structural Engineer; IL (#032887)
Certifications
Registration Boards (CLARE3)
Certification
LEED AP BD+C
Associations
MAJOR (Northern Virgin:)
Urban Land Institute (ULI)
Loudoun County Chamber of
Commerce; Board of Directors (2011-
7018), Executive Committee (2017-
2018)
*Experience prior to joining the firm
Certified Access Specialist (CASp) Plans Examiner, inspector and instructor I City of Corona, CA
Checks ADA improvement plans for the City of Corona including 36 city parks restrooms, handicap parking, and playgrounds. Inspects various existing city facilities for ADA compliance and make recommendations on required improvements.
Provides inspection and certification for completed improvements, including final walk-through and punch list creation. Provides design consultation and plan review services, from design through construction documents, Prepares and provides appropriate training materials for engineering staff, Including major updates to Federal and California ADA codes. Provides technical expertise and expert witness testimony as needed.
infrastructure Engineers, a Bowman company I kireo,: CA Principal of building & Safety. Directs and supervises professional and technical staff; prepares building and engineering proposals in response to RFPs and RFQs; makes hiring and disciplinary decisions;. identifies training needs; oversees plan check, permitting, and inspection; negotiates, administers, and monitors contracts and agreements. Provides effective leadership with the building and engineering departments to achieve project requirements, meets deadlines, satisfies customer and client needs, ensures safe operations, and meets profitability targets. Manages all aspect of building and engineering plan check, building and engineering inspection.
Provides building standards code, stormwater, and low impact development training to staff. Checks complex structural, architectural, disabled access, land development., and public improvement plans.
City Engineer I Cities of Artesia cnd Baldwin Pork, CA
Directed and administered all activities of the Engineering Department, including planning, designing, and directing construction and maintenance of streets, bridges, pipelines, water anci sewer systems, Managed capital improvement project_., reviewed designs completed by consultants. Monitor stormwater discharge from MS4, construction activities, and industrial activities into the city's storm drain system for compliance with NPDES Permit requirements. Reviewed and approved public improvement and land development plans prepared by private engineers, directed counter technicians to issue encroachment permits and grading permits, calculated grading bonds, coordinated inspection and acceptance of such work.
Building Official I Cities of Huntington Park, Montebello and Baldwin Pork Provided counter plan check and building code consultation; checked residential and commercial plans, including mechanical, electrical and plumbing; checked grading, drainage, low impact development, erosion control and WQMP plans: reviews soil, compaction, hydrology analyses and SUSMP reports; provided input to Planning Department in the drafting of Conditional U5Q Permits;, coordinated svitI City Infrastructure Engineers, a Bowman company Municipal Engineering Services I November 9,2023 48
Jay Shih, PE, CASp
Certified Access Specialist and Entitlement Review
Engineers in the review of tentative and final) tract reaps, parcel maps for lot split, and lot merger in compliance with the Subdivision Map Act.
Building Official and Principal Plan Check Engineer ( Cities of Rosemead and Lo Puente, CA
Provided counter plan check and building code consultation; checked residential and commercial plans, including mechanical, electrical and plumbing; checked grading, drainage, low impact development, erosion control and WQMP plans; reviewed soil, compaction, hydrology analyses and SUSMP reports; provided input to Planning Department in the drafting of Conditional Use Permits; coordinates with City Engineers In the review of tentative and final tract maps, parcel maps for lot split, and lot merger in compliance with the Subdivision Map Act,
Senior Plan Check Engineer I Cities of Baldwin Park andhuntington Pork, CA Provided counter plan check and building code consultation for the building departments. Checked residential and commercial plans, including mechanical, e&ectrical.and plumbing. checked boundary, topographic, ALTA surveys, grading, drainage, low impact development, erosion control and WQMP plans, Community )Redevelopment Agency I City of Los Angeles, CA4 Director of Engineering Department operations in revitalizing blighted communities within the city. Managed the design and construction of Upper 2nd Street ©ridge which connects the old downtown Los Angeles with Grand Ave. Oversaw staff construction managers and inspectors in managing construction contracts, Checked tenant improvement. building rehabilitation, and public works improvement plans prepared by staff engineers and consultants priori() advertising and bklding construction projects. Provided construction management services for a new 8,645 SF Community Center. Project includes a kitchen, multipurpose rooms, administration offices, restrooms, game room, concession room. landscaping, irrigation, site walls, site lighting, and paving.The building is utilizing a dual plumbed system, and the site is using reclaimed water for irrigation. The project has required close coordination with SCE, RWQCB, and Los Angeles County Department of Public Health.
Department of Public Works I City oflosAngeles, CA'
Civil Engineer, Designed seismic retrofits to strengthen the city's unreinforced masonry buildings, Managed construction of public improvements including grade separation, bulkheads, trunklines, tilt ups, and wastewater treatment plants. Checked subdivision maps and metes and bounds legal descriptions. Designed retaining walls and concrete bulkheads, Prepared public improvement plans including sidewalks, sewers and storm drains. Performed construction management of public improvements.
infrastructure Engineers, a Plowman company I Municipal Engineering Services I November 9, 202.3 49
a@ia',r uran
CEQA Manager
Education
as. Environmental Science, San Diego
State University
Certifications
Certified Inspector of Sediment and
Erosion Control In Training (CISEC-IT)
"Experience prior to joining the firm
Experience
Infrastructure Engineers, a Bowman company j Brea CA
Director of Environmental and Planning Services. Malta is one of IE's multi -faceted planners with an Innate ability to effectively interact with clients and the public to arrive at positive results when managing projects and staff. 2023-2031 Housing Element Update I City or Waco, CA
Project Manager. IE was hired to prepare the 2023-2031 Housing Element and associated CEQA Exemption for the City of Wasco. Maiia is the Project Manager on this project.
2023-2031 Housing Element Update I Ciryof.Shafter, CA
Project f Manager. IE was hired to prepare the 2023.2031 Housing Eternertt and the associated CEQA 1S / MND for the City of Shatter. Melia is the Project Manager cur this project.
2021-2029 Housing Element Update City ofAd'einruo, C:a.
Project Manager. IE is providing staffing and technical support for land use and environmental planning projects including the preparation of the 2021-2029 Housing Element and associated CEQA IS / MND for the City of Adelanto. Mafia is the Project Manager on this project.
2021-2029 Housing Element Update I City of Lynwood, CA
Project Manager. IE prepared the 2021-2029 Housing Element and the associated CEQA IS / MND for the City of Lynwood. Malin is the Project Manager on this project.
CEQA Consulting Sen/ices I City o' Norwoik, CA
Project Maroager. IE was selected to provide CEQA / Planning Consulting Services to the City of Norwalk by performing peer reviews of various documents pertaining to the Norwalk Entertainment District -Civic Center Specific Plan Project. Malia utilizes her experience with environmental document development and review to serve as the Project Manager and Senior Environmental Planner for this project. IE provided a review of the Environmental Impact Report (OR) and Specific Plan on behalf of and working dosely alongside. the city.
County of San Diego Department of Public Works I County of Son ©iego CA* Land Use and Environmental Planner. Malin was responsible for managing the environmental processing of public works Capital Improvement Projects ICIPJ, from concept through construction and final mitigation sign -off. Some example projects included road improvements, bridge rehabilitation and construction, flood control facilities, dump rernediation and complex emergency repair projects. Malia was responsible for critical negotiations with local, state, and federal resource agency representatives for all permitting and compensatory mitigation associated with impacts to sensitive habitat, jurisdictional resources and, listed species. Performed infrastructure. Engineers, a Bowman company I Municipal Engineering Services I November 9, 2023 50
t •": la urand
CEQA Manager
environmental code compliance, violation resolution, environmental remediation and maintained up-to-date knowledge of environmental laws, regulations and policy governing both public and private development. Malta has extensive experience presenting to members of the public, stakeholder groups, community planning groups, and representatives of state and federal regulatory agencies, Malta spearheaded the development of numerous technological advances for essential county -wide programs, resulting in substantial labor and cost savings.
San Diego Regional Water Quality Control Board, Core Regulatory Unit I Son Diego, CA"
Student Assistant, Provided the time management and organizational skills necessary to perform multiple complex tasks independently or when working closely with others. Contributed her extensive knowledge and use of the statewide database, CIWQS,as well as a general knowledge and understanding of numerous other databases used at the Regional Board. Exhibited resourcefulness and good judgment while evaluating individual projects and reviewing annual municipality submittals.
Technology Associates lntemational Corporation (TAW) (5on Diego, CA* Biologist, Performed tasks involving environmental, species, habitat, construction and mitigation compliance monitoring, Gained strong environmental law and policy understanding and application In the field and in technical report write-ups, Infrastructure Engineers, a Bowman company Municipal Engineering Services I November 9,2023 51
!Ian
Construction Monoger
Education
M.S. Civil Engineering, California State
University, San Jose
B.S, Civil Engineering, California State
Polytechnic University, Pomona
"Experience prior ta_oining they firm
SCE
Arjan Idnani worked on major infrastructure projects and on public works improvement and rehabilitation projects throughout California. His experience includes work on land development projects, capital improvement projects, construction management, project managennent, and administration. Arjaris experience also includes street improvement projects, water main line replacements, slurry seal Improvements, traffic signal improvements, and sanitary sewer improvements in cities of Bell Gardens, Montebello, Baldwin Park, South Gate, and South El Monte.
Experience
Construction of 5£31 Street Enhancement Project I City of Huntington Park, CA Project Manager.This project consisted of trenching, pipe layout, backfitling, pipe abandonment, pipe lining, demolition of existing improvements, relocation of utilities, construction of concrete improvements like sidewalks, curb and gutters, curb ramps, driveways, cold milling, concrete and asphalt paving, and placement and connection of traffic signal equipment.
Construction of Annual. Street Rehabilitation Project Phase 2B l City of Compton, CA
Project Manager, This project consisted of edge milling of existing pavement, 4 in of cold -in -place- recycling (CAR), material testing, 1-1 / 2 in to 2 in asphalt rubber hot mix (ARHM) overlay, removal and reconstruction of darnaged PCC sidewalks, curbs and gutters, cross gutters, local depressions, driveway approaches, added medians, future irrigation conduit installation, ADAcurb ramps; utility adjustments, recrmnecting existing curb drains, installation of new water rneter, traffic loop replacement, replace traffic signing, thermoplastic striping and pavement markings; and traffic control and other associate elements of work,
Construction of Urban Bicycle Project I City ofLi/no/0Od C:A Project Manager. This project included the construction of HMA Bike Path, curb and gutters, curb ramps, retaining walls, concrete swales, concrete box culverts, chain link fence, permeable pavers, installation of removable bollards, gates, main waterline, irrigation, install trees and shrubs, mulch, install single and dual ARM Pedestrian, lighting poles and luminaire, furnish and install way finding and interpretive signs, bicycle racks, fountains, and striping.
Construction of Central Park West I City ofBoldwln Pork, CA Project Manager. This project included the construction of Irrigation System and Landscaping, security lighting system, improvement of park area, construction of restroom ! storage area, installation of storm drain, sewer and domestic water system, construction of playground area and tot Eot areas with playground equipment, construction of volleyball and basketball courts and installation of bicycle rack, shade structures, 68Q's, picnic tablets and drinking fountains.
Infrastructure Engineers, a bowman company I Municipal Engineering Services I November 0,2023 52
Arjan nani, SCE
Construction Manager
Civil Engineer I City ofSmith E1 Monte, CA
Arjan operated as a permitting engineer for the city, issuing building permits and conducting Inspections for perm is and off -site improvements for buildings and tract maps, He wrote and reviewed RFPs and provided project management staff reports for City Council meetings. Some projects he was Involved with included the pool plaster project (including removal- of existing plaster, tiles, and railings and installing new plaster and tiles and railings); skate park construction (including removal of existing curb and gutter, sidewalk, and benches, and construction of curb ant gutter, sidewalk, ramp, drain and trellis); and Farmer Avenue Patch project, which included removal of existing pavement, compacting existing base rock, and installing 4 -in asphalk.
Santa Anita Traffic Signal Modification I Cityof$outh El Monte, CA Construction Manager. This project Included installation of new traffic signal poles, a new equipment cabinet, and a video camera and removing and replacing access ramps and striping.
Construction Manager G City of Montebello, CA
Bluff Road Improvement s.This project included cold milling existing 2 -inch - deep asphalt and installing 2 -in of asphatt overlay along Bluff Road, in addition, construction of new curbs and gutters, sidewalks, and driveways and access ramps were performed as well as installing traffic loops and striping.
Via Compo Improvements.This project included cold milling existing 3 -in - deep asphalt and installing 3 -in of asphalt overlay. Also removed and replaced damaged curbs and gutters, sidewalks, and driveways, and installed traffic loops and striped.
Beverly Boulevard Improvements. This federally funded project included cold milling existing 3 -in -deep asphalt and installing an overlay of 3 -in of asphalt, removing and replacing damaged curbs and gutters, sidewalk, and driveway, and access ramps, pruned trees, installed traffic loops, raised manholes, striped and constructed bus pads.
Flotilla Avenue Improvements. This project included replacement of damaged 12 -in clay sewer pipe in several locations as well as cold milling existing 2 -in - deep asphalt and installing an overlay of 2 in of asphalt. Removed and replaced damaged curbs and gutters, sidewalk driveways, and access ramps. Raised manholes, installed traffic loops, and striped
Garfield Avenue Improvements. This project included cold milling existing 3-•irr deep asphalt and installing an overlay of 3 in of asphalt, removing, and replacing damaged curbs and gutters, sidewalks, and driveways, and access ramps.
Constructed bus pads, Installed traffic loops, and striped.
Infrastructure Engineers, a Bowman company Municipal- Engineering Services November 9,2023 53
Arjan 1 Rdnani, SCE
Construction Manager
Safe Routes to School. This project included installation of speed signs, lighting crosswalks in pavement, hatched striping of cross walks, and construction of speed humps and access ramps.
ErnergencyVehicie Preemption Project I City of 8e11 Gardens; (A Construction Manager. Provided construction management and inspection of installation of Opticom detectors, Opticom controller equipment, connecting Opticom controller equipment to Opticom detectors and removal of the existing conduit and replacement with new conduits. The improvements were conducted at six intersections.
New Traffic Signal at the Intersection of Garfield Avenue and Madison Avenue J City of Montebello, CA
Construction Manager. Provided construction management and inspection for this project that included installation of a new traffic signal at the intersection of Garfield Avenue and Madison Avenue. Work was comprised of all the associated equipment and electrical components {video vehicle detection system, LED systems, cabinets}, painting of curb, traffic striping of the roadway, installation of markers and roadway +itarkings, and all other required equipment to ensure the proper and intended operation.
Installation of Bus Shelters I City ofHawalran Gardens, CA Construction Manager.This project included construction of new bus shelters along Carson Street and Pioneer Boulevard, installation, of solar lights, installation of decorative trash cans and benches at new and existing bus stops and painting existing bus stops.
Construction of Ramona Boulevard I City of Baldwin Parr. CA Construction Manager. This project included construction of new bus shelters along Carson Street and Pioneer Boulevard, installation of solar tights, installation of decorative trash cans ,and benches at new and existing hits stops and painting existing bus stops.
Widening of Kauffman Avenue and Dorothy Avenue; Construction of Firestone Median I City of South Gate, CA
Construction Manager, This project included excavation of 10 in of existing street and installing 6 in of aggregate base and 4 in of asphalt. Removed and roplaced curbs and gutters, sidewalks, and driveways and constructed access ramps. Also installed streetlights, a new 12 -in water main, water services hydrants, and constructed new storm drains and catch basins. Constructed a median island on Firestone Boulevard and installed an irrigation system ,and landscaping.
Infrastructure Engineers, a Bowman company I Municipal Engineering Services I November 9, 1023
ttif aar, EIT
Inspector
Education
B.S. Civil Engineering, University of
Texas at Arlington
Registrations
Engineer -in -Training CET): California
(#XE080535)
"Experience prior to Joining the firm
Attif Haffa r has over 30 years of diversified experience in the field of construction inspection, construction management civil engineering, water resources, and transportation, Attif has worked in the civil design of solar and wind farm projects, master planning for drainage facilities, stone drain, regional detention basins, hydrology and hydraulic analysts and water -quality studies, by utilizing LA Metro, Port of Long Beach, and OCTA, Metro link, RCTC, SBCTA, SANDAG and local municipalities.
Attif has designed urban highways and streets using Caltrans Standard and Specifications. He has also performed construction management by establishing the project execution plan, health and safety plan, quality assurance ! quality control plan, and construction phase coordination, as well as overseeing the design and resolving various issues.
Experience
Susan Rubio Zocalk Park ! Baldwin Park, CA
Inspector. Attif was involved in planning the entire project and documenting all the Jobs that must be cornpleted. Located northwest of Baldwin Park City Hall, at the intersection of Pacific and Maine Avenues to Sterling Way, the $11M park project is supported by $6M from the state budget, secured by state Sen. Susan Rubio, a former city council member in the city.
San Gabriel River Bikeway Project 1 Baldwin Park, CA
Inspector. Infrastructure Engineers provided engineering design services for 2,5 miles of a Class I bicycle and pedestrian path project to connect with an existing Class ill bicycle route. The entire project is built on rights -of -way either controlled by the City of Baldwin Park, Los Angeles County Department of Public Works, Los Angeles County Flood Control District or Caltrans.The right-of-way was acquired by the city through a land use agreement with the Los Angeles County Department of Public Works and Permits from Caitrans District 7. The design phase of the project included project management and meetings, data collection and record research, utility research and agency coordination, surveying, hydraulic and hydrology analysis, and final plans specifications and cost estimate (PS&E).
Urban Bicycle Project Lynwood, CA
This project included construction of H MA bike path, curb and gutters, curb ramps, retaining walls, concrete swales, concrete box culverts, chain link fence, permeable pavers, installation of removable bollards, gates, main waterline, irrigation, install trees and shrubs, mulch, install single and dual ARM pedestrian, lighting poles and luminaire, furnish and install way finding and Interpretive signs, blcyde racks, fountains and striping.
Annual Street Rehabilitation Project I Compton, CA
Inspector. IE performed in accordance with the plans, specifications and other contract documents and provided the following: construction of cold mill, ARI-IM pavement, AC base course, aggregate base, full depth AC slot pavement, curb and Infrastructure Engineers, a Bowman company l Municipal Engineering Services November 9 2023
t !f a art E!T
Inspector
gutters, sidewalks, cross gutter, alley intersection, driveway approach, curb ramps, signing, striping, markings, and pavement legends,, speed hump, traffic signal loop, adjust to grade existing sewer manhole, water valve, water meter, and storm drain manhole.The project location was Ros _acrans Avenue,. Compton Avenue, Slater Avenue and Santa Fe Avenue,
Structural' Design Plus, Inc. I Sherman Oaks, C'A'"
Attif was involved in planning the entire project and documenting all jobs that must be. completed. He managed staff and the expenses of the project efficiently throughout the process to ensure that adjustments for unexpected issues were resolved. Ile inspected pavement by utilizing the City of Hollywood specifications for slurry seal and placement of the asphaltic concrete. He designed and layout of dry utilities (fiber-optic, gas, electric) sewer, box culvert, storm drain, spillway, detention basin, water quality basin, and WQMP, SWPPP, BMP reports for commercial and industrial projects. Utilized Caltrans Standards and Specifications to oversee the inspection, of the lamp bridge and related structures, Worked in conjunction wth construction managers, local officials, and other parties to ensure the project met all safety standards while also accommodating deadlines, budget guidelines and other considerations.
Chapman Construction Corona, CA`
Inspected and reviewed projects to monitor compliance with standard specifications, safety codes, and other regulations. Scheduled events, programs, and activities as well as the work of others. Used logic and reasoning to identify the strengths and weaknesses of alternative solutions. Considered the relative costs and benefits of potential actions to choose the most appropriate one.
URS Corporation I Los Angeles, CA"
Preliminaryand final hydrology reports, using unit hydrograph and routing method.
Preparing WQMP and SWPPP reports for Soda Mountain Solar Project (350 -MW solar electric power generating facility) 29,000 acres.
North Spring Bridge over LA River, providing water surface elevations for the proposed and falsework condition for LA River.
South Wilmington Grade Separation (access roads and approaches to the viaduct) Port of L.A. P rformed drainage and WQMP rE,port, storm drain, sewer, water, and SWPPP plan according to Caltrans standard and specifications.
SR -4;t Truck Expressway Study, the project was jointly developed by the Alameda Corridor -East Construction Authority and Caltrans to replace the Schuyler Heim Lift Bridge with an elevated expressway to link Terminal Island with Alameda Street. Using Caltrans standard and specifications Attif was responsible for the storm drain, water pollution control plan, hydraulics analysis for Cerritos Channel and PS&E. infrastructure Engineers, a Bowman company I Municipal Engineering Services I Novernlrer9 2023 56
of a ar,ET
inspector
K&A Engineering I Corona, CA*
Design, plan checks and construction management for water (mainline, pump station), sewer, box culvert, storm drain, spillway, detention basin, water quality basin, and WQMP, SWPPPBMP reports for residential, commercial and industrial projects. Preliminary and final hydrology reports using rational, unit hydrograph and routing method. Provide quality control aind quality assurance so that the project is constructed In accordance with approved plans, specifications, budget and schedule according to Cattrans standard.
CM Engineering I Son Bernardino; CA*
Worked with the key project and construction contractor individuals to monitor action plans to rectify potential construction cost overruns or delays and accommodate significant changes to the scope of work. Advised the client and other team members of any such changes. Attif's responsibilities were to coordinate with the contracts management and project controls groups and any client subcontractors to maintain current and timely change orders according to Cattrans standard and specifications_ Participated in negotiations with regulatory agencies and public meetings in support of clients' Interests. Identified the needs for specialist resources to create project teams capable of completing effective, quality work, Discussed the qualifications required of the key project positions in specific detail with the senior managers, Collaborated with the office facilities staff to address project space requ1rernents.
Utilizing Caltrans standard and specifications, Attif was in charge of daily personal interactions with clients, designers, owners, contractors, inspectors and authorities having jurisdiction on the project. Attif also promoted technical and commercial excellence on the project through the application of quality assurance processes.
Monitored and reported on the progress of all project activity including significant milestones, and any conditions, which would affect project cast or schedule Established weekly meetings to review project status and formulate action items.
Texas State Highway Department I Snyder, ]X•
Highway design, plan, profile, drainage facility, pavement, striping, and details.
Monitored contractor's work and progress of construction to ensure compliance with plans, specifications for bridges, infrastructure and highway construction. Measured and recorded pay quantities and prepared daily reports. Issued notices of non- compliance and stop -work orders. Conferred with the contractor, designer, owner, and / or governing authorities to explain the basis for the issuance of the above - referenced notices and to discuss acceptable corrective actions. Material testing, measuring and recorded pay quantities,
infrastructure Engineers, a Bowman company I Municipal Engineering Services I November 9, 1023 57
Zure at, EFT
inspector
Education
M.S. Engineering, Moscow Civil
Engineering Institute
Registrations
Engineer -in -Training {FIT), California
General Building Contractor License
(3)
Certifications
Special Inspector Certificatesi
Commercial Building Inspector
Structural Masonry
Reinforced Concrete
Pre -stressed Concrete Special Inspector
Associate
ACI Field Technician Grade 1
Division of the State Architect (DSA)
Regulations & Procedures (Part I, 1i, III)
Languages
English (native / professional
proficiency)
Arabic (native f professional
proficiency)
Russian (elementary proficiency)
'Txperience prior to Joining the firm
Imad 7-urelgat has nor than 40 years of experience in construction inspection and resident engineer tasks. lie has been responsible for preparation of plans, cross - sections, details, and specifications for various civil and landscape projects. had has coordinated with other engineering disciplines, responded to plan check comments, and prepared material, take -off and cost estimates.
Experience
Urban Bicycle Project I ° ' °°, CA
This project included construction of HMA bike path, curb and gutters, curb ramps, retaining walls, concrete swales, concrete box culverts, chain link fence, permeable pavers, installation of removable bollards, gates, main waterline, irrigation, install trees and shrubs, mulch, install single and dual ARM Pedestrian, lighting poles and luminaire, furnish and install way finding and interpretive signs, bicycle racks, fountains and striping.
Maine Avenue improvement Project I City of Baldwin Pork, CA Provided construction inspection of this project, The purpose of the project was to create neighborhood -friendly pedestrian and bicycle linkages serving the areas surrounding Maine Avenue.Tbe sidewalks were widened by 2 ft, continuously on each side of the roadway; parking lanes have curb extensions at intersections and intermittent locations, Utilities were placed underground, and the driveway ramps were reconstructed to provide flat sidewalk paths across driveways. Lighting was improved and included pedestrian -scale lighting every 75 ft. Intersections were improved with new crosswalk markings, signal improvements, ADA Ramps, and a roundabout at Main Avenue / Olive Street with safety islands for pedestrians and bicyclists,
Long Beach Boulevard I City ofL.ynwooei, CA
Provided compliance with plans, specifications,, and the contract; oversaw traffic control, and provided daily log and inspection report entries, including pictures of the project. Reviewed and reported contractor claims, prepared weekly updatz reports, and reviewed contractor's invoices, verified completed work and approved all quantities. Infrastructure Engineers providedi construction management, inspection, and labor compliance that included roadway resurfacing of 192,779 sc, fin with a section of 2 -in AC top course and 1 -in AC leveling course and 40,000 sq. Et, with a section of 2 -in of asphalt rubber hot mix (ARHM) over 1 ! 2 -in SAMI sealant and 1 -in leveling course. Concrete Improvements included 4 -in sidewalk, driveway approaches, cross gutters, curb and gutter, curb ramps, installation of 16 detectable warning surfaces on existing curb ramps and construction of six new bus pads.
Pacific Pedestrian & Transportation improvement Project I City of Huntington Pork CA
Provided construction inspection, preparation of daily reports, review of change orders and progress payment requests, coordinated soils testing service and assisted with labor compliance.
Infrastructure Engineers, a Bowman company I Municipal Engineering Services I November 9, 2023 58
(mad Zureigat, EIT
fnspector
Mines Avenue Street Improvements I City of Montebello, CA Construction management and inspection services included construction inspection, preparation of daily reports, review of change. orders and progress payment requests, and coordinating soils testing services. The project involved roadway improvements, and pavement rehabilitation with concrete improvements of Frankel Avenue from Bluff Road to 5th Street and 16th Street from Madison Avenue to Harding Avenue.
Hone 2 Suites City of Montebello, CA
Provided construction inspection for this 203 -room, eight -story hotel, The hotel will be owned by the city and operated by Hilton, The hotel Is expected to generate more than $'1 M to the city's general fund each year.
City Sanitary Sewer System 20% CCTV Project j City of Montebello, CA Responsible for inspection of this project, including preparation of daily reports, review of change orders and progress payment requests, The project involved televising and rating of the condition of 20% of the city's sanitary sewer system, including possible as -needed cleaning and draining.
Bluff Road Street Improvement l City of Montebello, CA
Infrastructure Engineers was retained by the city to provide design, project management, bidding, award of contract, construction management and inspection of the Bluff Road Street Improvement project from Sycamore Street to Date Street (.45 mile).
Maple Ave Street Improvements I City ofMontebello, CA
Provided construction inspection of this roadway improvement project. Infrastructure Engineers prepared puns, specifications and estimates for roadway improvements, pavement rehabilitation, concrete improvements, ADA improvements and utility adjustments of Maple Avenue from Washington Boulevard to Mines Avenue. The pavement analysis and alternate rehabilitation strategies included budget analysis to complete as much of the street improvements within the fixed project budget.
Bicknell Park Pump Station Project E City of Montebello, CA Infrastructure Engineers provided project management, bidding, award of contract, construction management and inspection for the construction phase of Bicknell Park pump station. Responsible for construction inspection, preparation of daily reports, review of change orders and progress payment requests.
Citywi=de Safety Enhancement- Active Transportation Plan (ATP) j City of Bell Gardens, CA
Responsible for inspection of this project, including preparation of daily reports, review of change orders and progress payment requests. The project area was comprised of the entire City of Bell Gardens. One of the goals of this project was to create a bike -friendly environment. to encourage residents, especially students, to bike to their destinatiorrs.The proposed work at various locations included installing Infrastructure Engineers, a Bowman company [ Municipal Engineering Services I November 9, 2023 59
a Zurei *,at, ET
Inspector
video cameras at several intersections, installing Americans with Disabilities Act (ADA)-compliant ramps, countdown pedestrian heads, and bike lane signing and striping on some city streets that met minimum qualification fora bike lane.
Golden State Water Company I Carson, CA`
Prepared fire flow requests, invoices, plan checks, meter service record cards and filing,
West Valley Investment Group I Tarzana, CA*
Supervised construction and safety in seismic retrofit project in Santa Monica Parking Structure 5. Monitored excavations, poured concrete for foundations of piers at UCLA tower cooling building.
Mint) Construction Harbor City, CA`
Followed up constn.rction and safety project at Compton College: Stadium renovation; coordinated and managed subcontractors, conducted weekly construction meetings; prepared RFI, PCO, payment progress, purchase orders, as -built drawings and take -off.
Penco Engineering I Irvine, CA*
Prepared plans, cross -sections, details, and specifications for various civil and landscape projects. Coordinated with other engineering disciplines, responded to plan check comments. Prepared material, take -off and cost estimates, Infrastructure Engineers, a E3owman company I Municipal Engineering Services ! November 9, 2023 60
Christop er Ley, P•E
Senior Civil Engineer
Education
13.5. Civil Engineering, Oregon State
University
Registrations
Professional Civil Engineer;
California (#80620)
*Experience prior to joining the firm
Christopher Ley has over 15 years design and engineering experience. His expertise includes CAD and graphic design, civil engineering design Including street layout, hydrology, drainage, sewer design and grading for residential and commercial projects.
Experience
Walden arod Associates I Irvine. CA"
Project Engineer. Christopher was responsible for civil engineering design including street layout, hydrology, drainage, sewer design and grading for residential and commercial projects. Skilled in developing plans and survey data sets using AutoCAD Civil 3D 2012 and 2016. Production of reports using Microsoft Word and Excel, Bentley WaterCAD, and Bluebeam.
WWD i L&S Engineering I Monterey, CA"
Staff Engineer /CAD Manager. Responsible for civil engineering design Including street layout, hydrology, drainage, sewer design and grading for residential and commercial projects. Skilled in developing plans and survey data sets using AutoCAD Land Desktop. 2006 and AutoCAD Civil 3D 2011. Responsible for company's migration from Land Desktop 2006 to Civil 3D 2011. Subsequent duties as CAD Manager, responsible for all training in Civil 3D after initial off -site classes, development of comprehensive styles and description key sets, and implementing transitions to Civil 3O standards from Land Desktop, Also developed training aids and curriculum for transition. Responsible for conversion of Civil 3D files for Revit.
Administrative assistant duties during slow periods, including accounting, filing and office development- IT duties when necessary, including rebuilding network after Incomplete implementation by consultant. WWD became L85 in August 2012. 5aroyan Masterbuilders I Sand City, CA"
CAD Manager/ Senior Draftsman, Responsible for residential and commercial design arid drafting while ensuring ADA compliance, egress requirements and coordination of pions from various disciplines into a single set. Was responsible for implementation of AutoCAD 2006 system, training of 2 supervisors, development of CAD standards and overseeing transition from hand drafting.
Greenway Design I Marina, CA"
Drafting and Engineering Manager. Residential design and drafting Including determination of code compliance for lateral stability and egress. Extensive experience with Microstatton V[3 and Trlforma production drafting of residential structures, including application of engineering notes.
Linda! Cedar Homes,. Inc. I Seattle, WA'
Senior Draftsman, Responsible for residential design and drafting, including determination of code compliance for lateral stability and egress. Instrumental in creating structural designs of posts and beams fora variety of vertical and lateral Infrastructure Engineers„ a Bowman company I Municipal Engineering Services November 9, 2023 61
Christo her Ley, PE
Senior Civil Engineer
loads. Pioneered development of various charts as aids in design of structural elements. Directly involved in the implementation of Microstation Trifurrna 3D, and developed methods of aligning non -planar elements that were subsequently used by Microstation in their official training programs.
Baker Engineers, Inc. I Lynwood, WA*
Staff Engineer. Duties included structural design including wind and seismic analysis, gravity resign, rigid frame foundation design and pin pile foundation design.
Production and structural detail drawings and drafting foundation plans.
Infrastructure Engineers, ar Bowman company Municipal Engineering Services l November 9, 2023 62
r Farahani, TE, PE
Senior Traffic Engineer
Education
B.S. Civil Engineering, California State
University, Los Angeles
Registrations
Professional Traffic Engineer.
California (#72363)
Professional Civil Engineer:
California (#C54235)
'Experience prior to joining the firm
Amir Farahani has more than 30 years of experience in various traffic, transportation and civil engineering disciplines. He has experience with contract administration, design experience and regulatory compliance. He has worked with Infrastructure Engineers, a , wman company for the past two years as a Principal Engineer, He has been in charge of various traffic and transportation studies; design of traffic signals, high -intensity activated crosswalk (HAW() signals and Rectangular Rapid Flashing Beacon (RRFB) for pedestrian crossings. In working with the City of Orange, as an Engineering Tech. 11 and eventually as a City Traffic Engineer /Traffic and Transportation lvtanage►, he has been involved in all aspects of the projects the city has designed and constructed.This Includes coordinating with beat, county, state, and federal agencies and various utilities to ensure successful project completion.
Amlr understands the level of detail and problem -solving skills required to complete high -profile projects on time and within budget.
erience
Slauson Avenue Congestion Relief Improvements Project I City ofHuntington Park, CA
Project Manager, Conducting traffic signal left turn phasing for five Intersections in the project limits and recommending protected permissive left turn phasing with dashing yellow left turn arrow, Designed the subject traffic signals accordingly and prepared PS&E
ATP Cycle V -Safe Routes and Childhood Obesity Project I City of Huntington Park, CA
Project tvlanager. In charge of various traffic related works such as design of HAWK beacon system for three pedestrian crossings; design of pedestrian scramble crosswalk striping; traffic signal modifications to create a separate pedestrian scramble cycle; rest riping of existing crosswalks with a high -visibility continental design; realignment of existing crosswalks to align with the proposed conversion of Hood Avenue into a one-way street and prepared the project PS&E, tmperlal HWY and Ruth Avenue Traffic Signal Improvements Project I City of Lynwood, CA
The work to be done, in general, consists rat, but is not limited to the following:
mobilization, traffic control, remove existing crosswalks, warning lights, and streetlights; removal and construction of concrete sidewalks, curb and gutters, curb ramps; furnish and install traffic signal system, battery backup system, pull boxes, traffic signal loop detectors and connect DLC to pull box, relocate fire hydrant and water valve, providing construction survey, and traffic signing, striping and markings as shown on the plans and noted in these special provisions, linfrastnicture Engineers, a Howman company ( Municipal Engineering Sennces November9, 2023
r Farahani, TE, P
Senior Traffic Engineer
Senior Traffic Engineer/Manager-Transportation Services / City Traffic Engineer I City of Orange, CA'
Amir utilized his many years of experience to manage various traffic and civil engineering projects, He also managed traffic and civil construction projects during his employment with the City of ©range_ Amir planned, managed, and provided oversight of the daily functions, operations and activities of traffic and transportation division of the City of Orange, Including Traffic Management Center (TMC), traffic signal timing, operation and maintenance, review of residential and commercial developments; and was responsible for leading the traffic operation and transportation planning team, Amir also managed and participated in the development and implementation of goals, objectives, policies and priorities for the division, He also provided recommendations within departmentaE policy regarding appropriate service and staffing levels.
Oversaw and participated in the development. and administration of the operation and capital Improvement division annual budget; participated in the forecast of funds needed for staffing, equipment, materials, and supplies; monitored arid approved expenditures; implemented adjustments. Attended and participated as City Traffic Engineer at city council, commissions, committees, and other agency meetings as required, Prepared and presented technical information, analysis, and recommendations, Oversaw the development of consultant requests for proposals for professional and construction services and the advertising and bid processes; evaluated proposals and recommended project award; administered contracts after award.
Collaborated with other city departments, police, fire, Cahrans, OCTA and other outside agencies to plan, implement and complete projects and initiatives to improve traffic safety and mobility around the city. Identified outside funding sources For city traffic and transportation programs, directed and prepared funding applications, Responded to balk and transportation related resident and commuters' inquiries and requests. Oversaw traffic signal plans preparation and coordination programs, developed and approved traffic engineering standards and policies for the city.
Reviewed and analyzed studies, environmental impact reports, proposals, and negotiations with other agencies to secure projects and policies favorable to the city.
Senior Civil Engineer / Associate Civil Engineer f Assistant Civil Engineer i Engineering Tech.11 j City o/Orange, CA"
Planned, prioritized, assigned, supervised, reviewed and participated in the work of staff responsible for providing traffic engineering services within the assigned section, Developed and prepared construction plans, specifications, and estimates for various in-house design projects including traffic, streets, sewers and storm drains, Participated in the selection of engineering staff; provided or coordinated staff training; worked with employees to correct deficiencies; implemented infrastructure Engineers, a Bowman company j Municipal Engineering Services j November. 9, 2023 64
Amir Farahani, TE, PE
Senior Traffic. Engineer
discipline procedures. Reviewed and prepared transportation and traffic engineering studies; prepared requests for proposals; reviewed environmental impact reports; reviewed transportation models. Performed protect management for the design and construction of capital improvement projects for city departments including public works, community services, economic development and fire. Ensured conformance with state, federal, and local standards and procedures in carrying out projects, Prepared and applied for project funding from federal, state, and utility grant programs including Highway Bridges Rehabilitation and Replacement (HBRR), Arterial Highway Rehabilitation Program (AHRP), Safe Route to Schools (S R2S SRTS), Highway Safety Improvement Program (HSIP),Transportation Enhancement Activities (TEA), Orange County Sanitation District Cooperative Projects, State -Local Transportation Partnership Program (SLTPP), Community Development Block Grant (ODBG) and City EngIneers Flood Control Advisory Committee (CEFCAC).
Interacted and communicated with the public, city management and departments, contractors, consultants and other governmental agencies to resolve issues.
Prepared and processed various documents including council agenda reports, consultant agreements, hydrology and hydraulic studies, requests for proposals, plan check, consultant selection, bld evaluation, insurance certificates, environmental compliance, encroachment permits. right-of-way and reimbursement packages.
Revised and maintained city standard plans and specifications. infrastructure Engineers, a Bowman company j Municipal Engineering Services j November 9, 2023 65
Charlie arr,
Water Engineer
Education
5,S. Civil Engineering (Environmental
Emphasis), California Polytechnic State
University, Pomona, 1987
Registrations
Professional Civil Engineer:
California (#534351
Associations
Associate Member, American Society
of Civil Engineers (ASCE), Metro LA
Branch
American Water Works Association
(AW WA)
Orange County Water Association
(OCWA), past member
Water Eme.rgency Response of Orange
County, Engineering Advisor, past
member
'Experience prior to joining the firm
Charlie Marr is Principal Civil Engineer with engineering and management experience in water and sewer systems master planning and design, including hydraulic modeling, and water resources analysis in support of pump station and pipeline design, and creative .solutions to sewer service that may not be conducive with standard operation.The master plans for domestic water, wastewater, and nondomestic water systems performed for cities: large residential, industrial, and commercial developments: and rfniversity campuses state-wide typically include preparation of capitpl improvement programs identifying future facilities arid sizing to accommodate proposed infill and service area expansion. Nlaster planning and hydraulic modeling are key tasks for preliminary design of both water and sewer piping and pumping systems to determine optimal pipe diameter, and pumping / system curves for reliable. and efficient operation.
Experience
Avalon Tract 36649 Water and Sewer Calculations Jurupa Valley, C4 Prepared water and sewer flow estimates and hydraulic analysis. The water and sewer purveyor for the Project site is Rubidoux Community Service District who conditioned the analysis in order to confirm the capacity of their existing systerns to serve the Project, RCSD Water and Sanitary Sewer Systems Design and Construction manual dictating operating parameters to verify with the completion of the proposed project and full occupancy. The Manual was used for estimating average and peak water. as well as procedures for evaluating system operation. For the water system that meant maintaining minimum pressures and maximum velocities, for sewer, it was determined that depth ratio increase was negligible,
MCRV Sewer Service E valuation I Houston, TX
Assisted on a development project for Houston Medical Center RV Resort, Utility service challenges stemmed from a remote location for this, medical facility designed for recovering hospital patients, and a scheduling misunderstanding fora sewer main line construction_ The. sewer would not be constructed for at least a year following p anent move -ins to the Resort. Blue Mountain Development assembled a team of experts to help coordinate approvals for a temporary pump -to -haul operation, which required compliance with additional regulations associated with hauling medical wastewater, Provided technical guidance for collection system, wastewater storage, pumping capacity, and service frequency schedule. This allowed Resort operation until the sewer main could be constructed and impfernented for permanent service, 1aPaima Master Plan Update J La Palma, CA
Recently completed La Palma's 2020 WSMP Update, Prior to this, prepared the City's Sewer Master Plan and SSMP, complete with a NASSCO-certified condition assessment specialist for identifying and prioritizing all defects found fora major portion of the city's system. The updated sewer reports included hydraulic analysis and focused on updating the Cif' and required SECAP of the SSMP? As a result of the Infrastructure Engineers, a Bowman company Municipal Engineering Services I November 9, 2023 66
C arlie arr, PE
Water Engineer
detailed studies, the city has been compliant with the WOR and SSMP requirements.
Well No. 1 Site Improvements I Bell Gardens, CA
Preparing preliminary design and final design for the city's well site improvements project as an applicant for State Water Resources Control Board funding to improve its water supply system and maximize its use of local water supplies. New facilities include Treatment vessels for controlling PFAS contamination, 1:2 MG steel storage reservoir, and booster pump station. The project team solicited the expertise of RC Slade and Associates, renowned groundwater and well planning specialists, to provide opinion regarding feasibility of drilling a second well within the project site.
Appurtenances include (I) on -site piping and valving; (2) booster pumping with variable -speed to control flow for the dosed system operation; (3) modifications to existing welt operation; (4) I million gallons of on -site storage; (S) new chlorine injection 1 analyzers; and (6) SCADA offices. The PDR phase is complete and final design was underway until PFAS contamination was discovered requiring the addition of pressure vessels (GAC or Ion Exchange).
Pico Apartment Building Rehabilitation 11'ico Rivera, CA* Assisted In resolving a sewer service challenge fora 79 -unit apartment complex which was undergoing a complete rehabllitation.The rehab project exposed sewer issues that required a complete overhaul of the service concept, including of -site collection to, and utilization of; a recently decommissioned LACSI.) trunk sewer.
Assisted in the presentation of these alternatives, and ultimately improved sewer service for the entire project.
Caol +rrOaks Senior Living 9 Whittier, CA*
Evaluated the public sewer system and capacity to serve a new senior Ilving faculty.
The review was critical for obtaining ciry approvals to connect to the existing sewer system that was thought to be at capacity. Key demonstrating existing capacity was the extended flow monitoring operation performed by a flow monitoring contractor MS Cubed). Determined that existing flows were within acceptable operating depth ratios, and that the addition of flows from the new residential development would continue operating at acceptable depths,
Tournament Hilt Sewer Analysis I Beaumont CA*
Prepared a sewer analysis fora potentially undersized trunk sewer to be utilized by the proposed Tournament Hills residential project (Project), The trunk sewer system serves hundreds of acres of exiting development and is proposed to serve a separate development within the same sewershed as the TFt project. The team coordinated with the sewer purveyor (City o€ Beaumont) to understand the 'design' boundaries of the sewershed, estimate sewer volume and peak flows, evaluate record drawings of the sewer, and matte a determination of its capacity to serve the Project. The study resulted in options that could be implemented, including monitoring of flows during Project development move -ins and acceptable design procedures fora sewer Infrastructure Engineers, a Bowman company I Municipal Engineering Services I November9, 2023 67
Charlie arr, PE
Water Engineer
anticipated to flow full during wet weather, Inflow and Infiltration (I&I) can be very unpredictable, but can be minimized if designed for.
Wastewater Recycling Plant and Recycled Water Use I Coronado, CA' Part of a Civil Engineering team to update a feasibility study prepared for a high profile wastewater reclamation and reuse facility on the Coronado Golf Course.Thls high profile project is a result of the conditions caused by five years of drought and limited watering allowance, and to develop a more reliable water supply for irrigation. city and golf course officials authorized an In-depth study to update their 2011 feasibility study and prepare bridging documents to pave the way for procuring a design -build (D -B) team.The study proposed to include (1) feasibility study update; (2) engineering report preparation for the Waste Discharge Requirements; (3) public outreach and workshops; (4) funding opportunities; (5) CEOA, CA Water Code and AWWA WateReuse compliance; and (6) D -B team solicitation and procurement.
The Foundry J Redondo Beach, CA'
Teamed with Blue Mountain Development to re -direct sewer flows from an old metal working operation site to a more appropriate sewer system conditioned by the City of Redondo Beach. The site was under redevelopment from an industrial land use site to a high -end multi residential development. Existing sewering from the old metal- working operation included a problematic siphon that required frequent flushing to minimize odor issues. By converting the sewer system as part of the redevelopment project, the city was able to remove a "hotspot" maintenance issue from their O&M program. The recommended sewer system had to be pumped from a central pumping facility on -site to a different location within the public system, which was accomplished using a private gravity flow system to a low-pressure pumping station and discharge system pre -fabricated by E -One.
Infrastructure Engineers, a Bowman company I Municipal Engineering Services I November 9, 2023 68
athan Kirby
Administrative Support
Education
Business Administration, Cypress
College, Cypress, CA
'Experience prirrr to
in
the firm
Most of Nathan Kirby`s career has been spent in service to municipalities in Los Angeles County. He has held positions in which he has been responsible for administrative duties related to public works projects, construction and quality control.
Experience
Complete Street Improvements on Maine Avenue Project I City of Baldwin Park, CA Served as project assistant. Scope of work included removal and replacement of sidewalk, curb and gutter, driveway approach, catch basins, and manholes, rain garden, landscape, new pavement, which included manhole adjusting and .streetlight system. Responsible for preparations and / or organization of all construction documents including Contract Change Orders, Meeting Agendas, Progress Payments, Project Budgets, RFC's, Right of Way Maps, Daily Reports and Weekly Statements.
Garfield Avenue Improvements Project f City of Bell Gardens, CA Served as project assistant. Scope of work included removal and replacement of sidewalk, curb and gutter, traffic loops, regulatory signs, curb ramps, and new pavement, which included manhole and valve adjusting. Responsible for preparations and Tor organization of all construction documents including Contract Change Orders, Meeting Agendas, Progress Payments, Project Budgets, RR's, Right of Way Maps, Daily Reports and Weekly Statements.
ATP Cycle 2 Uncontrolled Crosswalk Pedestrian Safety Enhancements Improvements Project I City of Huntington Pork, CA
Served as project assistant. Scope of work included removal and replacement of traffic signal systems, vehicle and pedestrian heads, cabinets, controllers, pedestrian push buttons, curb and gutter, curb ramps, flashing beacon, HAWK signal, street name signs, traffic striping and tree removal. Responsible= for preparations and / or organization of all construction documents including Contract Change Orders, Meeting Agendas, Progress Payments, Project Budgets, RFI's, Right of Way Maps, Daily Reports and Weekly Statements.
Water Main Replacement Project I City of Huntington Park, CA Served as project assistant. Scope of vvork included removal and replacement of concrete sidewalk, curb and gutter, driveway approaches, curb ramps, 8 -in and IB-in water main line, water meters, water service lines, tree pruning, and new pavement, which included manhole and valve adjusting. Responsible for preparations and / or organization of all construction documents including Contract Change Orders, Meeting Agendas, Progress Payments, Project Budgets, RFI's, Right of Way Maps, Daily Reports and Weekly Statements,
Infrastructure Engineers, a Bowman company Municipal Engineering Services November 9, 2023 59
Cal" it a ran
Public ©utreoch .Speciolisr
Education
B.S. Geography, California State
University, Fullerton
Certifications
Geographic Infori cation System (GIS)
'Experience prior to jointing the firm
Cali is a highly motivated, self -motivated, detail -oriented self-starter with high proficiency in various disciplines and four years of experience. Cali has a B.S. in Geography, a certificate in GIS, experience with ArcGIS, Microsoft Office Suite, Google.
Suite, Canva, digital and print marketing, wehsite management., quality assurance, research and more. Ca'll's unique skJU-set makes her a valuable member of our team, Experience
Infrastructure Engineers, a bowman company j Brea, CA
Planning Technician. Under general supervision of internal Senior staff, provides a variety of essential planning, GE5 and marketing functions. Cali provides technical assistance and information to internal staff on projects, the public, performs technical work involving customer service; review of applications and plans for completeness and compliance and performs other related work as, necessary. Cali provides assistance to staff planners, as needed and serves as the project's primary Planning Technician on -call. Under the general supervision of the Planning Manager and GiS Analyst, Cali also provides technical and support assistance in the development and implementation of Planning Division activities and GIS Support Servkes.ihese activities include but are not limited to providing land use and planning information assistance to various project teams; performs and provides GIS computer application support to the GIS Analyst to various project teams; and is vested in learning through hands on training, project tasks and rrientoring by senior level staff.
Koi LLC I ffortvoik, C'h
Marketing Coordinator. Cali drove the creation and maintenance of the company's rrterrial social media calendar. She created and scheduled content for the following social media platforms: Instagram, Facebook, Twitter,TikTok, Linkedin, Pinterest, etc. Worked collaboratively with designers in the ideation and execution of visual content, Assisted in communications and developing and implementing social campaigns with ambassadors and influencers. Daily interactions with the social media community by responding to messages, comments and drive engagement.
XYZ Printing, Inc, Anaheim, CA"
Marketing Assistant. Assisted In the everyday operations of the company's social media accounts by developing daily social media content and scheduled posts to coincide with target audience usage. Implemented strategies to expand brand recognition in the 3D printing industry. Provided outstanding service to new and existing customers by focusing on customer concerns and developing solutions via phone and email. increased customer base by collaborating with content creators and promoting products through giveaways, product content and promotional sales.
Researched competitor services and trends for analysis of marketing strategies.
Infrastructure Engineers, a Bowman company j Municipal Engineering Services jNavember9,2023 70
Shawnt abakhanianl
QA / QC Engineer
Education
AutoCAD, Glendale College
AutoCAD Civil 3D, Westech College
Microstatton, Westech College
Land Development Desktop, Westech
College
"Experience prior to Joining the 6mi
Shawnt Babakhanian has 30 years of experience in the preparation of contract drawings for a variety of civil engineering, transportation engineering and structural engineering projects. He also has extensive knowledge and expertise in both it and CADD management.
Experience
Bartlett Avenue Rehabilitation Project City ofAdelanto, CA CADD Manager. Responsiblee for overseeing the project's drafting, design, cost estimates, and specifications for improvements to the asphalt pavement, cross gutter, ADA curb ramps, and water main replacement.The project was not only completed according to the client's requirements but also finished on schedule and well within the budget. In addition, oversaw drafting quality assurance and quality control to meet the standards and requirements set forth by the City ofAdelanta.
Bellflower Street Rehabilitation Project I CiryofAde/unto, CA CADD Manager. Improvements to the asphalt pavement, cross gutter, ADA curb ramps, and water main replacement. Responsible for reviewing the project's specifications and cost projections, as well as the design and drafting. In addition, responsible for drafting quality assurance and quality control to meet the standards and requirements set forth by the City of Acielanto.
SBZStreet Enhancement Project 1 GtyofHuntington Park, CA Designer / Drafter. Sanitary sewer, water, and street Improvement plans, including plan and profile, cross-section, construction details, utility, and traffic striping plans.
Was also involved in preparing specifications and cost estimate for the project, which required the replacement of the old sanitary sewer and water system with a newer system that was up to standards. in addition, was responsible for quality assurance / quality control for drafting of civil plans during the project.
Water Main Replacement Project City of Huntington Park, CA Designer/ Drafter. Main water line, fire hydrants, water meters, and backfiow prevention element of the project Also In ciharge of the field investigation, specifications, and cost estimate. In addition, was responsible for quality assurance ! quality control for project plans and details during the protect. The project was completed per standard details, on time, and within budget.
Various Residential Street improvements (FY 2d)-211)1 City of Hawaiian Gardens, CA Designer / Drafter. Street improvements, signing and striping, and utility plans. In addition, was involved in design, specifications and cost estimates preparation.
Responsible for quality assurance / quality control for protect plans and details to ensure the project was completed while adhering to city requiremer ts.The project was completed on time and within budget.
infrastructure Engineers, a Bowman company I Municipal Engineering Services I November 9,2023 71
Shawnt Ica ak avian
QA QC Engip eer
Schmidt Road Street Improvement Project { City of Ei Monte, CA Designer / Drafter. Street improvements, signing and striping plans, In addition, was involved in specifications and cost estirnates preparation. He was responsible for quality assurance / quality control for project plans and details to ensure the project was completed while adhering to city requirements.The project was completer) on time and within budget.
Alley irnproveitment, Various Street Rehabilitations and Water Main Replacement Protect I City of Ereo, CA
Designer / Drafter i Utitity Coordinator. Responsible, for designing / drafting alley pavement, longitudinal gutter, street improvements, signing and striping and utility improvements within the project area. In charge of drafting the main water line system, fire hydrants, fire services, water meters and back -flow prevention for the project, Also, responsible for acquiring and verifying utility plans by coordinating with utility agencies. Shawnt oversaw quality control for the project to ensure that it was completed while observing city requirements'.
Ailey and lndusttiad street Rehabilitation Project I City offBrea, CA Designer! Drafter. Responsible for the preparation of plans, profiles, and details, and involved with the field investigation that included field surveys of the asphalt pavement, sidewalks, curbs and gutters, driveways, and curb ramps. Also involved in specifications and cost estimate preparation, Responsible for quality assurance / quality control for the project's plans and details to ensure that the project was completed while adhering to city requirements, The project was completed on time and within budget.
Lincoln Park improvement j City of Anaheim, CA
Designer / Drafter. Project included construction of roadway improvements, including removal of existing improvements including AC pavement, concrete sidewalk, curbs and gutters, storm drain improvements and landscaping, and construction of new street and sidewalk improvements, including new concrete curb and gutter, concrete sidewalk, storm drain catch basins, drainage inlet modifications and AC pavement sections. in addition, was responsible: for quality assurance / quality control for draftnig of civil plans during the project,
Safe Routes to School - Pleasant. View, Vineland and Tracy Elementary Schools City of Bafclwrn Pori, CA
Designer / Drafter. Preparation of PS&E for new signing and striping, curb extensions, new curb and gutter. sidewalks, ADA-compliant ramps, and pavement. Other improvements include the installation of detectable warning surfaces. The project consists et work on nine intersections.
Infrastructure Engineers, a Bowman company Municipal Engineering Services I November9,2023 72
Jason as und,
Planner ill
Education
Master of Urban and Regional
Planning, University of California,
Irvine
B.S. Environmental Policy, Analysts and
Planning, University of California, Davis
Affiliations
American Planning Association (APA)
member
'Experience prior to/pining the firm
URP
Jason Wassnund has over 2C years of experience in current and advance planning including General Plan Amendments, Housing Element Updates, architectural design reviews, historic preservation planning, and extensive high level entitlement processing. Having spent nearly his entire career working for cities in Southern California, Jason Is an expert in urban land use planning, He has led the development of significant portions of housing elements, processed annexations and code amendments, managed the designation of numerous landmarks, and managed a variety of commercial and residential development projects including general plan amendments, zone changes, planned unit developments, and conditional use permits. Jason Is proficient in Accessory Dwelling Unit (AM)? application processing and oversees the processing of Commercial Cannabis Program applications.
Experience
Infrastructure Engineers, a Bowman company I r3reo, C:A Planner III, Jason provides support services on current and advanced planning projects including Housing Element Updates, Environmental Justice Elements, Public Safety Element Updates, Specific Plan Amendments and associated CEQA documents, As a planner, Jason is well -versed In entitlement processing, the preparation of staff reports, resolutions, and ordinances; has extensive planning counter experience, and assists with public outreach activities such as scoping meetings, workshops, charrettes and popup events.
2023-2031 Housing Element Update City ofWasm, C4
Senior Planner. IE has been selected to prepare the 2023-2031 Housing Element far the City of Wasco, Jason is the lead urban planner In the development of the 6th Cycle Housing Element, under Mafia Durand's direction. Jason has contributed to the research and composition on this project, leading the development of the constraints, previous element review and programs sections.
2023-2031 Housing Element Update I CltyofMater, CA
Senior Planner. IE has been selected to prepare the 2023-2031 Housing Element for the City of 5hafter. Jason is the lead urban planner in the development of the Housing Element, under Melia Durand's direction, Jason has contributed to the research and composition on this project, leading the development of the constraints, previous element review, and programs sections.
Senior Planner I City ofNorco, CA
Jason provided staff augmentation to the City of Norco, Jason served the city as a part-time Senior Planner on an interim basis, provided on -site support services, completed housing element annual reports and processed an annexation to the city.
Senor Planner I CirV of Moreno Valley, CA
Jason recently provided remote planning services to the City of Moreno Walley on an interim part-time basis. He performed plan checks and reviewed tentative tract map infrastructure Engineers, a Bowman company I Municipal Engineering Services November 9, 2023 73
Jason as und,
Planner 111
applications for planned unit development involving a general plan amendment / zone change for the city.
2921-2029 Housing Element Update I City ofAdefonto, CA
Senior Planner.. Jason is the lead urban planner assisting with the development of the City of Adelanto's Housing Element, under Maiia Dural rd's direction, Senior Planner I City°,Adelonto, CA
As part of IE's Planning Support and Staff Augmentation Services contract with the City of Adelanto, Jason provided on -:site support services to the city on current and advance planning projects and CEQA compliance. Jason managed the. daily planning functions Including assigning plan checks, managing the current projects list, managing major current planning projects, coordinating reports to the City Manager and providing direction to /supporting the professional development of planning staff.
Senior Planner ( City of Huntington Park, CA
On behalf of IE, Jason provided staff augmentation services to the City of Huntington - Park on a full-time interim basis on major current planning projects, policy development and CEQA compliance.
Associate Planner City of Corona, CA
Jason completed a 12 -month assignment at the City or Corona as the exclusive planner assigned to process over fifty Commercial Cannabis Program application packets, developing review processes, identifying and proposing solutions to application review issues and providing strong customer service to initiate a successful commercial cannabis permit program. His processing skills and knowledge resulted in the successful completion of his service.
Design & Historic Preservation Section I City ofPosacferra, CA' Assistant Manner, Extensive background in design and historic preservation planning, including entitlement processing, preparation of staff reports and public hearings.
Jason participated in the designation of numerous landmarks, National Register nominations, design review ofcommercial buildings and multi -family residential development, numerous Certificates of Appropriateness and Implementation of a master development plan,
Department of Planning and Redevelopment I (7ty of Glendora, CA' Assistant Planner. Extensive background in current planning, entitlement processing, regular counter assistance, research and preparation of staff reports, and public hearings before the Planning Commission and City Council. Projects included entitlement processing for new commercial buildings and additions; mult'rfarnily residential developments; new wireless sites and co -locations; second story reviews; code amendment ordinances; zone changes; variances; conditional use permits; and historic landmark designations.
infrastructure Engineers, a Bowman company j Municipal Engineering Services i November 9, 2023 74
John oreno
Environmental Planner it
Education
13.A. Urban Studies, California State
University, Northridge
*Experience prior Opining the T rm
John is a highly motivated and goal -driven professional offering 17 years' experience preparing environmental compliance documents pursuant to the California Environmental Quality Act (CEQA) and the National Environmental Policy Act (NEPA) for both public and private sector clients. He has prepared Categorical Exemptions, Addenda, Initial Studies (ISs), Negative Declarations (NDs) and Mitigated Negative Declarations (MNDs), Environmental Impact Reports (EIRs), Program EIRs, Subsequent EIRs as well as tiered documents and combined CEQA i NEPA documents.. He has excelled in developing comprehensive and legally defensible CEQA / NEPA documents and effective permit applications for complex and challenging projects.
His documents are precise, clearly written, and well organized. Additionally, his experience also includes preparing Housing Elements and has experience working with cities as an augment staff member primarily reviewing project plans for consistency with city development standards and land use / zoning requirements.
Technically proficient in all Microsoft Office programs and familiar with AutoCAD, ArchiCAD and Arch G15 8. John is also fluent In Spanish.
Experience
?023-2031 Housing Element Update l CityofWasco, CA
Associate Environmental Planner. Serving as an Associate Environmental Planner, John assisted with the preparation of the City of Wasca's Housing Element to ensure the Housing Element was being prepared in compliance with all state requirements.
John took on several roles in the completion of the Housing Element which included: identifying and analyzing existing and projected housing needs for all economic segments of the community; providing a summary of the population and housing characteristics that contribute to the present and future housing needs in Wasco; provide goals, polldes, quantified objectives and scheduled programs to preserve, improve and develop housing; attended several community meetings and participated In public outreach efforts, prepared a Categorical Exemption in compliance with CEQA and frequent direct contact with staff of various state agencies. Housing Programs, which John helped develop, became the basis for annual progress reports (APR). The Housing Programs included: 1) Adequate Sites for Affordable Housing; 2) Home Ownership Assistance Programs; 4) Section 8 Housing Choice Vouchers; 5) City Grants for Special Needs Groups; 7) Code Enforcement; 8) Conservation of Existing and Future Affordable Units; 9) Streamline Residential Permit Processing; 10) and Fair Housing Services,
20:13-2031 Housing Element Update I City of Shctlter, CA Associate Environmental Planner. Serving as an Associate Environmental Planner, John assisted with the preparation of the City of Shafter's Housing Element to ensure the Housing Element was being prepared in compliance with ail state requirements. John took on several roles in the completion of the Housing Element which Included: Identifying and analyzing existing and projected housing needs for all economic segments of the community; providing a summary of the population infrastructure Engineers, a Bowman company I Municipal Engineering Services November 9, 2023 75
John oreno
Environmental Planner fl
and housing characteristics that contribute to the present and future housing needs in Shafter; provide goals, policies, quantified objectives and .scheduled programs to preserve, improve and develop housing; attended several community meetings and participated in public outreach efforts, prepared a Mitigated Negative Declaration (MND) in compliance with CEQA and frequent direct contact with staff of various state agencies, Housing Programs, which John helped develop, became the basis for annual progress reports (APR). The Housing Programs included:; 1) Adequate Sites for Affordable Housing; 2) Home Ownership Assistance Programs; 4) Section 8 Housing (hoke. Vouchers; 5) City Grants for Special Needs Groups; 71 Code Enforcement; 8) Conservation of Existing and future Affordable Units; 9) Streamline Residential Permit Processing; 16) and Fair Housing Services,
Associate Environmental Planner I City ofAdelanto, CA
As part of IE's Planning Support and Staff Augmentation Services contract with the Crty of Adelanto, John provided support services to the city on CEQA compliance in preparing Adelanto's 6th Cycle Housing Element where it was determined that. a Mitigated Negative Declaration (MND) would be. the appropriate environmental compliance document for the Housing Element which analyzed potential environmental impacts associated with implementing the city's Housing Element.
John analyzed all environmental topic areas and where appropriate,, developed mitigation measures to reduce impacts to levels below significance.
Associate Planner I City ofMoreno Valley; CA
As part of IE's Planning Support and Staff Augmentation Services contract with the City of Moreno Valley, .John provides support to the City of Moreno Valley as an augment staff member. Duties include reviewing project plans submitted by applicants to determine compliance with city developmentstandards and land use ! zoning requirements. Additionally, duties include reviewing CEQA environmental documentation and technical studies in support of projects as well as direct communications with city staff and project applicants.
Associate Environmental Planner ( Project Manager I Cityof Bakersfield, CA In support of the preparation of an Environmental Impact Report {OR) for the Hageman Industrial Park General Plan Amendment and Zone Change in the City of Bakersfield, John has been providing support in all phases of the CEQA process, including initial project planning; public notice preparation, distribution, and filing; conducting public. outreach including public meetings and hearings (traditional and virtual), Notices of Determination and other decision documents. John collects, catalogs, and responds to public comments and coordinates with responsible and trustee agencies.The City of Bakersfield lead agency in the event of a legal challenge..
Additional duties include project budget and schedule tracking.
Infrastructure Engineers, a Bowman company I Municipal Engineering Services November 9, 2023 76
Ca eron Lukas,
GIS Analyst
Education
M.S. Environmental Science &
Technology, California State University,
Fullerton
B.A. Environmental Analysis, Pitzer
College
Certifications
Data Analysis Certification, University
of California, Irvine
Basic Wetland Delineation
Certification, Wetland Training
Institute, Wisconsin
"Experience prior to joining the firm
Cameron is a GIS Analyst who has .seven years of environmental consulting experience including conducting wetland delineations, noise construction monitoring, tree surveys, nesting bird surveys, habitat restoration monitoring, with a concentration on GIS applications thereto. Knowledge also extends to permitting (specifically regarding USAGE 404 Permits, RWQCB 401 Certifications, and CDFW 1600 Agreements) and CEQA. Cameron is proficient In Wetland Delineation, CEQA, USACE 404 Permits, RWQCB 401 Certifications, CDFW 1600 agreements, Arcmap, ArcGIS online, GPSTrimbles and data collection, ArcGIS Collector, programming skills in Excel, VBA, Python, R, JavaScript, SQL Databases, Tableau, 'Big Data, Machine Learning, Microsoft Office and Adobe Photoshop.
ExperLence
2023-2031 Housing Element Update I City of Wasco, CA
infrastructure Engineers has been hired to prepare the 2023-2031 Housing Element for the City of Wawa Cameron is the GIS Analyst providing GIS services and support for graphics and visuals for the Housing Element He has conducted geospatial analysis of the City o3 Wasco to identify appropriate sites for residential development according to the RHNA allocation. He Is preparing the site inventory AFFH analysis and corresponding figures. He conducted ADU analysts using the City of Wasco's APRs and HCD approved methodology as part of the RHNA allocation. 2023-283 Housing (Element Update City ofShafter, CA
Infrastructure Engineers has been hired to prepare the 2023-2031 Housing Element for the City of Shatter. Cameron is the GIS Analyst providing GIS services and support for graphics and visuals for the Housing Element. He has conducted geospatial analysis of die City of Shaftei to identify appropriate sites for residential development according to the RHNA allocation. He is preparing the site inventory AFFH analysis and corresponding figures. He conducted ADU analysis using the City of Shafter`s APRs and HCD approved methodology as part of the RHNA allocation. 2021-2029 Housing Element Update j City ofAdelant'o,. CA Infrastructure Engineers has been hired to prepare the 2021-2029 Housing Element for the City of Adelanto. Cameron is the GIS Analyst providing GIS services and support for graphics and visuals for the Housing Element. He has conducted geospatial analysis of the City of Adelanto to Identify appropriate sites for residential development according to the Rt!NA allocation, He Is preparing the site inventory AFFH analysis and corresponding figures, He conducted ADU analysis using the City of Adelanto's APRs and HCD approved methodology as part of the RHNA allocation. 2021-2029 Housing Element Update I City of Lynwood, CA
infrastructure Engineers has been hired to prepare the 2021-2029 HousIng Element for the City of Lynwood. Cameron is the GIS Analyst providing GIS services and support for graphics and visuals for the Housing Element He has conducted geospatial analysis of the City of Lynwood to identify appropriate sites for residential Infrastructure Engineers, a Bowman company I Municipal Engineering Services November 9,2023 77
Ca eron Lukos,
GIS Analyst
development according to the RHNA allocation. He is preparing the site inventory AFFI-t analysis and corresponding figures. He conducted ADU analysis using the City of L.ynwood's APRs and HCD approved methodology as part of the RfiNA allocation, General Nan and Zoning Code Consistency Project I City of Bell Gardens, CA Infrastructure Engineers has been contracted to assist the city in updating the General Plan to ensure consistency with the-.. Zoning Code. The city is evaluating approximately one hundred parcels for zone change to allow for more mixed -use and residential development throughout the city, Cameron is the GIS Analyst who conducted geospatial analysis if the City of Bell Gardens to identify inconsistencies between the General Pan Land Use Map and Zoning Map. He prepared GIS-based maps of existing land use and zoning designations and updated those land use and zoning maps to correct identified inconsistencies,
Environmental Justice Element and Public Safety Element Update I City of Lynwood, CA
GIS Analyst, Cameron is providing GIS services and support to assist in the production of tables, figures and exhibits.
Asian Garden Mall Parking Structure I City of Westminster, CA GIS Analyst. Cameron is providing GIS services and support for graphics and visuals in production of project description.
Ruth Vfllalobos and Associates I Ontario, CA`
GIS Analyst / Associate Biologist. Cameron supported and assisted in concluding biological surveys and wetland delineations. Prepared maps and complex databases using a variety of digital data sources including the most current aerial photography, AutoCA[], GPS field collection data, and yen -transformation of historic data for production of various reports, including wetland delineations and permit applications. Reviewed and prepared EIR ancf CEQA document sections, project descriptions, technical documents, and biological documents., Utilized software knowledge including Art-GIS 10,X, ArcGIS Online, Arc Collector, Trimble GPS Receivers, Pathfinder Office Software, Adobe Photoshop and Microsoft Office (Word, Excel, PowerPoint).
Glenn Lukos Associates I Sonia Ana, CA"
GIS Technician. Cameron formulated GIS models for wetland delineations, mitigation plans, biological surveys, environmental planning and land use planning. Conducted GIS analyses for U.S. Army Corps of Engineers, Regional V,rater Quality' Control Board, and California Department of Fish and Wildlife jurisdictional delineations, biological resources and impactand environmental assessments / alternatives analyses.
Prepared relevant, presentable, protect -specific exhibits for reports and CEQA documents that depict aquatic resources, biological resources, monitoring areas, proposed impacts, proposed restoration and photo documentation. infrastructure Engineers, a Bowman r_ompany I Municipal Engineering Services I November 9,2023 78
ahar aradaran, EIT
Utility Engineer and Engineering Assistant
Education
M.S. Civil and Environmental
Engineering with a focus on Water
Resources,Callfornia State University,
Fullerton
B.S. Civil Engineering, University of
Science and Culture, Iran
Registrations
Engineer in Training (EIT);
California (#T 78797)
*€xperierrce prior to joining the firm
Bahar Baradaran has four years of experience in civil engineering that includes roadway infrastructure projects.
Experience
Bellflower Street Rehabilitation Project I City ofArieianto, CA Engineering Assistant for designing and planning the primary pavement rehabilitation, water main and sanitary sewer lines. Also designed the pavement based on the geotechnical report and was responsible for coordinating with geotechnicai investigators to identify the pavement design and requirements.
Prepared plans, profiles, specifications and cost estimate for this protect Also sent utility notices and coordinated with Edison, water and gas companies.
Bartlett Avenue Rehabilitation Project I City ofAdetando, CA Engineering Assistant who gathered data from survey and site inspections to design and plan the main water and sewer lines. Collaborated with client to develop water and sewer improvement plans and profiles in compliance with city regulations.
Conducted extensive research and analysis of existing infrastructure, topography and environmental factors to develop effective solutions. Designed and drafted detailed plans and profiles using Civil 3D, Managed project timelines and prepared cost estimate to ensure R was within budget limits and provided the best value.
SB1 Santa fe Avenue and Mlles Avenue I City of Huntington Park, CA Engineering Assistant who was instrumental in sketching plans for sanitary sewer, water and street enhancements.This included detailed plan, cross-sectional views and traffic striping. Played an essential role in helping with specifications and calculating the cost estirroate for the project, which entailed updatnng the outdated water and sanitary sewer systems to meet current standards.
CIP Priority 2B Street Improvement Project I City of Lynwood, CA Engineering Assistant who created all sheets for improvements and utility relocations for the city's Phase 2 CIP Street improvement Project. Tasks included coordinating with utility companies and conducting field investigations to obtain measurements of existing site and proposed improvements, Prepared specification package per Greenbook and has developed quantities for removals and improvements for cost estimation,
ATP Cycle 2ELynwood Community Linkages to Civic Center and Lon Beach Boulevard I City of Lynwood, CA
Engineering Assistant responsibile for creating the signing and striping sheets for the project. Work involved creating the construction notes and designing the new striping on AutoCAD,
infrastructure Engineers, a Bowman company I Municipal Engineering Services I November 9, 2023 79
ahar ara aran, EIT
Utility Engineer and Engineering Assistant
Street Rehabilitation Project + City of Bel! Gardens, CA Engineering Assistant responsible for developing street cross section and base map; performed field reconnaissance to inspect and verify surface indications of utilities. Infrastructure Engineers is providing design, project management, bidding of contract, construction management and inspection, as well as federal fund administration for this project that involves removal of existing AC paving and paving of AC pavement and concrete improvement reconstruction, including replacing existing curb and gutter, sidewalk, driveway approaches, access ramps, and adjustment of utility covers, traffic striping, markers, pavement markings and arcb painting.
Internship at City of Irvine ( Q1yoflrvine, CA`
Intern who acted as a sustainability manager assistant. Aided in the development of plans on drainage, road, and residential projects and helped with environmental studies, permitting and alternative analyses. Observed the preparation, function and process of tender and contract documents in action and assisted civil engineers to fulfill these. Also collaborated with research on other projects as a team member Internship at William Simpson and Associates I City of Luke Forest, CA" intern who drafted detail of sections. plans, and elevations with AutoCAD. She handled cost of materials estimations, report and document tracking, project documentation, on -site project visits, and building permit applications. Bahr shadowed senior civil engineer on a project to determinate the on -going stability of concrete stabilized footpath around a commercia/ center.
Infrastructure Engineers, a Bowman company I Municipal Engineering Services I November9, 2023 80
a : e abibi,
Engineering Assistant
Education
M.S. Tra nsportation Planning,
international University of Qazvin, Iran
B.S. Civil Engineering, Sharif University
of Technology, Tehran, Iran
Registrations
SCATS Training Course 1 IRTA /New
South Wales -Sydney -Australia
"Experience prior ta joining the firm
Flamed Habib has 12 years of experience in traffic engineering, especially in Traffic Signal Planning, Actuated Traffic Signal Systems, and rT5 systems. His experience includes drafting, and designing traffic. signal plans, writing traffic signal warrants and stop sign warrant reports, creating cost estimates, generating specifications, designing street overlays, and generating conceptual imagery for exhibits in different projects,
Experience
Quiet Zone Preparation of PSArE for 12 Railroad HWY Crossings I City of Covina, CA Engineering Assistant. Responsible for preparation of proposed Improvement plans for 12. highway / railroad crossings including quadratic gates, medians, pavement, traffic striping, markings and signage in accordance with CAMUTCD and Metrolink Standards.
Left Turn Warrant Studies for Five Intersections at 5lauson Avenue I City of Huntington Pork, CA
Engineering Assistant. Responsible for creating the left turn warrants report and verifying the warrant conditions satisfied on the CA-MUTCD. Designed a collision diagram, conducted an analysis on the collision history of the intersections, simulated these five Intersections in Synchro for five different scenarios, conducted pedestrian safety analyses and provided a field review of existing conditions.
Ali -Way Stop 5lgn Warrant Analysis - Florence Place and Scout Avenue Intersection I City of Bell Gorden, CA
Engineering Assistant, Responsible for creating the all -way stop warrant report and verifying the warrant conditions satisfied on the CA-MUTCD. [Designed a collision diagram, conducted an analysis on the collision history of the Intersection, Sight Distance Evaluation and provided a field review of the existing conditions.
Ail -Way Stop Sign Warrant Analysis .iaboneria Road and Gotham Street Intersection I City of Bell Gardens, CA
Engineering Assistant. Responsible for creating the all• -way stop warrant report and verifying the warrant conditions satisfied on the CA-MUTCD. Designed a collision diagram, conducted an analysis on the collision history of the intersection, Sight Distance Evaluation and provided a field review of the existing conditions.
Speed Zone Survey and Speed Limit Study for Garfield Avenue I City of Setl Gardens, CA
Engineering Assistant. Responsible for creating Speed Survey Analysis report in accordance with CA-MUTCD and CVC. Conducted an analysis on the collision history of the intersection, Road Condition Analysis and provided a field review for achieving the efficient speed limit.
Infrastructure Engineers, a Bowman company I Municipal Engineering Services ( November 9, 2023 81
a e
a
Engineering Assistant
ibi
Transportation Assessment for the Rancho Adelanta City Center Project I City of fleIiGordens, CA
Engineering Assistant, Responsible for creating the Transportation Assessment report including Prcject:Trip Generation based on ITE-Trip Generation Manual (lest edition), Project Trip Distribution &Trip Assignment, Vehicle Miles Tr,aveled (VMT) Assessment, Traffic Signal Warrants Study, analysis of other modes of transportation (non -automobile facilities) for the project, This involved using AutoCAD to create the Conceptual Traffic Signal Plan and Access Improvement for the proposed intersection.
AU -Way Stop Sign Warrant Analysis - Bellflower Street and Lawson Avenue Intersection City ofAdelanto,CA
Engineering Assistant. Responsible for creating the all -way stop warrant report and verifying the warrant conditions satisfied on the CA-MUTCD. Designed a collision diagram, conducted an analysis on the collision history of the intersection, Sight Distance Evaluation and provided a field review of the existing conditions.
All -Way Stop Sign Warrant Analysis -- Stevens Street and Bartlett Avenue intersection I City ofAdelanca, CA
Engineering Assistant. Responsible for creating the all -way stop warrant report and verifying the warrant conditions satisfied on the CA-MLITCD. Designed a collision diagram, conducted an analysis on the collision history of the intersection, Sight Distance Evaluation and provided a field review of the existing conditions.
All -Way Stop Sign Warrant Analysis -Stevens Street and Kemper Avenue Intersection I City ofAdelunfo, CA
Engineering Assistant. Responsible far creating the all -way stop warrant report and verifying the warrant conditions satisfied on the CA-MLITCD, Designed a collision diagram, conducted an analysis on the collision history of the intersection, Sight Distance Evaluation and provided a field review of the existing conditions.
New Traffic Signal at Imperial Hwy and Ruth Avenue Intersection I City of Lynwood, CA
Engineering Assistant. Responsible for the design of the traffic signal, striping plans, specifications, and cost estimate for the new traffic signal Int.ersection.This involved using AutoCAD to create the general notes, construction notes, conductor schedule, traffic signal plan and phase diagram for this project.
Pedestrian Hybrid Beacon(HAWK), AD -Way Stop Sign and Traffic Signal Warrant Analysis at Santa Fe Avenue and Weber Avenue intersection l City of Lynwood, CA Engineering Assistant. Responsible for creating the PHI, ail -way stop sign, and traffic signal warrant report and verifying the warrant conditions satisfied on the CA- MUTCD. Designed a collision diagram, conducted an analysis on the collision history of the intersection, Sight Distance Evaluation and provided a field review of the existing conditions.
infrastructure Engine€rs, a Bowman company I Municipal Engineering Services I November 9, 2023 82
'chael ela Cruz, EIT
Engineering Assistant
Education
B.S. Civil Engineering, California State
University, Los Angeles
Registrations
Engineer in Training (ETC):
California
"-Experience prlorto joining the firm
Experience*
lnfirarntructure Engineers, a Bowman company ( Brea, CA Engineering Assistant. Performed tasks contributing to the completion of various public works projects under the supervision of a professional civil engineer registered in the State of Caflfornla.These tasks includeCAD drafting !design; grading and drainage design, preparation of plans, specifications, and estimates (PS&E); submittal and plan check coordination with agencies, clients, and subconsuitants; preparation of Standard Urban Stormwater Mitigation Plans (SUSMP) and Water Quality Management Plans (WQMP); quantity takeoff, earthwork calculations, and field checks.
Bellflower Avenue Rehabilitation Project I City ofAdetanto, CA Engineering Assistant. Assisted in the development of preliminary Plans, Specifications and Estimate (PS&E) for full -depth asphalt pavement rehabilitation, including redesigning curia ramps to meet ADA compliance. Pavement design was based on geotechnlcal recommendations and city requirements. Coordinated with land surveyor to identify limits of right-of-way and required dedication, Bartlett Avenue Rehabilitation Project I City ofAdelanto, CA Engineering Assistant. Assisted in the development of Plans, Specifications and Estimate (PS&E) for full -depth asphalt pavement rehabilitation, including redesigning curb ramps to meet ADA compliance. Pavement design was based on geotechnicai recommendations and city requirements. Coordinated with land surveyor to identify limits of right-of-way and required dedication,
San Gabriel River Greenway and Neighborhood Connection Project V City of Baldwin Park, CA
Engineering Assistant. Assisted in the development of Plans, Specifications and Estimate (PS&E) for the landscaping of a 2.3 -mile shared -use blke trail currently under construction. Coordinated for plan review and project compliance on behalf of the City of Baldwin Park with various governmental agencies, Including United States Army Corps of Engineers (USACE), Los Angeles County Flood Control District (LACFCD), and Los Angeles County Department of Public Works (LACDPW), Contacted vendors to incorporate project elements crucial to the project scope. Coordinated with the Landscape Architectural subconsultant to ensure landscape and irrigation plans comply with requirements of the aforementioned agencies.
Big Oalton Wash Greenway and Neighborhood Connection Project I City of Baldwin Park, CA
Engineering Assistant. Assisted in the development of Plans, Specifications and Estimate (PS&E) for a ZS -mile shared -use bike trail. Coordinated for plan review and project compliance on behalf of the City, of Baldwin Park with various governmental agencies, Including United States Army Corps of Engineers (USACE}, Los Angeles infrastructure Engineers, a Bowman company I Municipal Engineering Services November 9.2023 83
Michael ela Cruz, EIT
Engineering Assistant
County Flood Control District (LACFCD), Los Angeles County Department of Public Works (LACDPW), Southern California Regional Rail Authority (SCRRA) and neighboring municipalities. Contacted vendors to incorporate project elements crucial to the project scope.
P.A. Arca Engineering, Inc. I City of Carson, CA'
.junior Civil Engineer, Performed tasks contributing to the completion of various private land development and public works projects under the supervision of a professional civil engineer registered in the State of California. These tasks include:
CAL) drafting design, grading and drainage design, low impact development (LID) design, preparation of SUSMP and WQMP, preparation of Storm Water Polliutiou Prevention Plan (SWPPP) reports, SWPPP inspections, hydrology studies, cost estimate, quantity takeoff, earthwork calculations, constniction administration and support, sewer area studies, slope density analysis, and field checks.
Infrastructure Engineers, a Bowman company I Municipal Engineering Services j November 9, 2023 84
Jae lirn array, EIT
Engineering Assistant
Education
B.S. Civil Engineering with a
spedaliaation in Structural
Engineering, University of California,
Irvine
Registrations
Engineer in Training (EIT):
California (#178483}
"Experience prior ro joining the firm
iaelin Murray has two years of experience in civil engineering which includes roadway and stormwater projects.
Experience
ATP Cycle 5 Citywide Complete Street Improvevnents Project I City rafBell Gardens, CA
Engineering Assistant.laefin was instrumental in drafting base maps from survey and assessor maps. Also res}xonslble for creating existing utility maps and creating plan cut sheets.
South Verdugo Road Pavement Rehabilitation City ofGiendale, CA Engineering Assistant Played an essential rote in conducting field project walks utilizing GIS to identify darnaged or hazardous utilities, concrete and pavement. She also checked and identified sidewalks, driveways and ramps for proper width, Iheight and slope. Prepared plan sheets for improvements, designing driveways and ramps, Industrial Commercial Facilities Prograrn Project I City of Bell Gardens, CA Engineering Assistant Responsible for creating inventory and gathering data un each commercial and industrial facility that meets need for a NPDES per mit.Tasksalso included coordinating appointments for inspection, conducting stormwa ter pollution prevention inspections of facilities, and record keeping photos, inspection forms, and notes.
infrastructure Engineers, a wrnarr company Brea, CA
Intern. Aided development of plans for beautification and rehabilitation projects. iaelin also aided in the development of specifications packages. Coordinated u ility notices for traffic and rehabilitation projects. Handled quantities and subsequent mst estimates for various roadway improvements and beautffications. Drafted preliminary design of retaining ring wall design.
Internship I City of Dana Point, CA"
Capital Improvement Project Intern. Drafted project exhibits and utility maps with AutoCAD. She streamlined records of city property inventory, construction budgeting and bid scheduling, Aided in the development of roadway project plans and as-bullts.
Accompanied, conducted field walks for topography, drainage, and roadway damage assessment. Navigated records requests for right of way, building plans and utility maps.
Infrastructure Engineers, a Bowman company I Municipal Engineering Services I November 9, 2023 85
Jennifer Santillan
Engineering Assistant
Education
k35. Civil Engineering, University of
California, Irvine
*Experience prior fling the firm
!ennifer 5antillan has tour years of progressive experience in design and CAD support in engineering and transportation, She has experience working for civil design, engineering, and transportation companies prior to joining Infrastructure Engineers, a Bowman company.
Experience
Various Residential Street Improvements Projects } City of Bel! Gardens„ CA Engineering Assistant who worked on the design of pavement rehabilitation of various residential streets within the City of Bell Gardens. This included preparing plans, specifications and estimate for the city to advertise the package for contractors to bid, Other roles included sending out utility notices to coordinate with Edison, water, and gas companies, (2021-2022)
Arterial Street Improvement I City add Guide Is, CA
Engineering Assistant who prepared alignments, profiles, utility research, and many other items for plans and also communicated with the engineering team on projects and assisted the staff engineers with their day-to-day duties. Coordinated field investigations with city staff and took field data measurements to then be able to map on AutoCAD and prepare improvements, establish quantities necessary for work, prepare a cost estimate and develop a spec package for performance and bidding requirements. (202Y•2022)
OP Priority 2 Street Improve=ment Project I Gty of Lynwood, CA Engineering Assistant who coordinated with geotechnical investigators to obtain boring and coring results to identify pavement rehabilitation requirements on various streets within the City of Lynwood, Other tasks Included obtaining field data from conducting multiple site investigations and plotting obtained data onto AutoCAD. (2©22.2023)
Transportation Intern for City of Costa Mesa I City of Costa Mesa, CA* Intern who authorized parking, film, and oversize load permits. She also developed interpersonal skills for communicating via telephone as well as email r:orrespondence with the residents of Costa Mesa.
Engineering Intern for RCE Consultants Inc. I CA"
Intern who learned how to do markups, alignments, profiles, utility research, and many other items for plans. Also communicated with the engineering team on projects and assisted the staff engineers with their day-to-day duties, Learned how to he independent in her assigned tasks, and was self -motivated when given a task.
Civil Design Team for UCI Transportation & Distribution Services I CA" Worked in a team to update and design AutoCAD drawings for UCI parking lots, parking structures, and roadway striping. Also completed fieldwork in measuring, locating utilities, striping, and analyzing existing sites.
Infrastructure Engineers, a Bowman company I Municipal Engineering Services ) November 9, 2023 86
tnnieU
CAD Technician
Education
B.S. Electronics, Suzhou Advanced
Electronic College, Suzhou, China
Certifications
Drafting - Computer Aided Technical
Modeling and Animation Certificate,
Pasadena Clty College
"Experience prior rejoining the firm
F.xperience
in Carr Surveys, inc. ! Anaheim, CA"
CAD Drafter. Anchor bolt sheet preparation. Provided coordinates to locate U.S. Site location, Checked dimensions, scaled and aligned the drawings, changed layer colors and dim to start a new drawing or match previous. Page setup, pdf and plot, export ail the cogo pnts data out imported alit the data into excel spreadsheet, data entry grids, bbp, pattern types Info, extract data and processed them into AB Report. Sent to client.
GKC Engineering Corp. j Irwindale, CA''
CAD /System Manager. Drew rough and detailed scale plans using computer -assisted drafting (CAD) equipment and software in the design of foundations, buildings, and structures from start to finish, based on preliminary concepts, sketches, survey points, engineering calculations, specification sheets, and other data, in support of engineering. Prepared professional sheets, drawings, and documents, meeting contractor specifications and compliant with industry standards, legal requirements, municipal codes, and regulations. Developed plans for grading, exterior buildings, parking tots, storm drains, street. improvements, and street lighting within the confines of the property; some residential experience. Generated cross section views; edited existing ground profiles and finished ground profiles. Surveyed construction documents frorn points to drawing. Worked closely with designers and drafters and supported engineering staff to ensure coordination with interior design. Collected and processed Information and data for engineering development by researching and obtaining standards / codes required by client and Jurisdiction through interaction with -necessary personnel to accurately and efficiently develop plans CAD Operator I CA"
Drew rough and detailed scale plans using computer assisted drafting (CAD) equipment and software in the design of foundations, buildings, and structures from start to finish, based on preliminary concepts, sketches, engineering calculations, specification sheets, and other data, in support of engineering, Prepared professional sheets, drawings, and documents, meeting contractor specifications and compliant with industry standards, legal requirements, municipal codes, and regulations.
Developed plans for grading, exterior buildings, parking lots, storm drains, street improvements, and street lighting within the confines of the property; some residential experience. Generated cross section views; edited existing ground profiles and finished ground profiles. Worked closely with designers and drafters and support engineering staff. Collected and process information and data for engineering, Infrastructure (Engineers, a Bowman company I Municipal Engineering Services I November 9,2023 87
ckey . " ruched
Director of Might -of -Way and Land Services
Education
Coursework, Allied f3usiness Schools,
Inc,
Coursework & Seminars, The Real
Estate Academy, Inc.
FHWA-NHI Programs
VDOT Specific Appraisal Seminars
Coursework & Seminars, The Appraisal
Institute
Registration
Certifiers General Real (:state Appraiser:
Virginia and West Virginia
State Licensed Real Estate Salesperson:
Virginia
Appraisal Experience
500+ Eminent Domain Appraisals
Completed since 2006
Commercial, Industrial & Residential
Experience
Qualified Expert Witness:
City of Charlottesville, VA
Colonial Heights, VA
Culpeper County, VA
Fuquier County, VA
Affiliations/Memberships
Virginia State Real (state Appraiser
Board, Chairman
Location
Fredericksburg, VA
*Experience prior to joining the firm
Rickey Stuchell has specialized in the appraisal of Real Property since 2004 and will serve as Project Manager for this contract with the City of Lynchburg. He is qualified as an ExpertWitness in matters pertaining to real estate, has served as an Appraiser for the Virginia Department ofTransportat ion, arxi as Negotiator on numerous projects. In January of 2017, the Governor of Virginia appointed Rickey to be a member of the Real Estate Appraiser Board through the year 2020 and is the chairman of the appraisal board and was re -appointed through 2021. In addition, he has been a Project Manager on small acquisition projects, and a Relocation Specialist on other projects_
Experience
VDOT I-66 Express Lane P3 Project I Fairhrx, VA
Lead appraiser and appraisal manager for a 275 -parcel project.
Route 460 Lynchburg, VA
Lead negotiator and relocation agent on this project Mr. Stuchell handled 5 negotiations and 2 residential relocations on the project. meeting an aggressive design build schedule.
Route 29 Interchange j Culpeper, VA
Lead negotiator and relocation agent on this project. This project is being constructed to create a flyover and on and off ramps from Route 29 to Route 666 eliminating the need for a signalized intersection, Mr.Stuchell handled the appraisals for 10 of the parcels and the negotiation for an additional 7 parcels, Route 7 Widening Fairfax, VA
i..ead appraiser and appraisal manager for a 110 -parcel project, Mr. Stuchell handfed all of the advanced appraisals that required significant acquisitions and oversaw a team of 2 review appraisers and 5 appraisers on the project.
Dulles Metro Rail, Phase 1 j DC Metro, VA
Lead negotiator and relocation agent on this project This project involved the extension of the rail service from the DC metro area beyond Tyson's Corner. Mr.
Stuchell handled the negotiations of 15 parcels and the relocation of 3 businesses.
Rolling Road r- irfax, VA
lead appraiser and project manager fora 142 -parcel project. Mr, Stuchell oversaw a team of one 11) Review Appraiser, five (5) Appraisers, and five (5) Negotlatiors on the project,
Infrastructure Engineers, a Bowman company Msmlcipal Engineering Services j November 9, 2023 88
Chelisa Pac S, PE, SP S
Drainage and Storm water Engineer
Education
Master of Science, Emphasis In Water
Resources, University of Colorado at
Boulder
B.S., Civil Engineering, Brigham Young
University
Registration;
Professional Engineer: California
(#71026)
Qualified SWPPP Developer (QSD) and
Qualified SWPPP Practtiorrer(QSP) in
California
'Experience prior to folnfrrg the 5rm
Chelisa is a registered civil engineer and has over i8 years of experience specializing In drainage and stormwater quality. Her expertise spans a wide range of public and private projects In Riverside and Sari Diego Counties Including development and Implementation of stormwater pollution prevention plans (SWPPPs), design of storm drain improvements, analysis of hydromodl(icatlon management practices, analysis of hydrology and hydraulic models and design of Best Management Practices (BMPs), which includes Low Impact Development (LID) practices.
Experience
The Villages I City of Escondido, CA
implemented regional BMP and drainage strategy for 110 -acre residential development that included redevelopment of a former golf course. Also included offslte roadway and drainage improvements within both the Caltrans and city Jurisdiction for the 380 -unit development,
Ballpark Village 15an Diego, CA
Developed water quality technical report and drainage study for Ballpark Village mixed use high rise near Petco Park for !MI. Evaluated design options to address project's drainage challenges and coordinated with building team for water quality BMP design and construction. Developed stormwater pollution prevention plan (SWPPP) and trained construction staff regarding weekly Inspections to comply with CGP requirements_
Park and Market I Son Diego, CA
Prepared drainage study and storm water quality management plan for high profile mixed use downtown redevelopment block, Coordinated with building team for integrated BMP solutions and green roof for stormwater compliance, North Ernbarcadero Visionary Plan 8 Son Diego, CA
Developed drainage and water quality studies for Phase I of San Diego's western waterfront revitalization prorect.Tasks included preparation of construction documents to shift Harbor Drive east to create a 100 -ft promenade between E Street and B Street and Improvements to West Broadway from the railroad tracks to Harbor Drive to create a 'Grand Hail" leading to the Harbor. SWPPP development Included complex phasing and traffic control plans, Provided construction support services to revise the drainage design due to field constraints..
Lane Field North and Setback Park E Son Diego, CA
Prepared SWPPP and water quality technical report for downtown San Diego's waterfront redevelopment protect. Assisted processing of the Water Quality Technical Report through approval by the Port of San Diego and California Coastal Commission, Coordinated with geotechnical and landscape consultants on measures to reduce stormwater pollution to San Diego Bay.
Infrastructure Engineers, a Bowman company l Municipal Engineering Services November 9, 2023 89
Chelisa Pack, S, PE,
Drainage and StornnwaterEngineer
SP
`5
Convention Center Phase III Expansion ( San Diego, CA
Performed the CEQA master drainage plan and regional water quality analysis for the future expansion of the San Diego Convention Center to support the EIR. The intent of the analysis Is to discover the best regional strategy to address the impacts of expansion and minimize disturbances to existing infrastructure.
Old Police Headquarters (5on ?i• CA
Performed the CEQA master drainage plan and regional water quality analysis for the future expansion of the San Diego Convention Center to support the EIR. The intent of the analysis was to discover the test regional strategy to address the impacts of the expansion and minimize disturbances to existing infrastructure.
Encanto and Southeast San Diego Community Plan Update ( San Diego, CA Prepared drainage and water quality summary report in support of the Program LIB for two community plan updates for the City of San Diego. Reviewed CEQA documents and coordinated with EIR team on CLQA drainage and water quality mitigation measures.
Quarry Creek ( Carisbod, CA
Developed stormwater management plan / hydromodificatllon report and drainage studies for Quarry Creek Development Master Plan, encompassing 73 acres of development within a sensitive reclamation area. Designed and Implemented regional approach to drainage and water quality design, beginning at the Tentative Map and EIR preparation stage to the final engineering grading plan stage.
Coordinated with EIR team and city staff regarding BMP selection and maintenance.
Front and A Courthouse Commons Redevelopment ( Son Diego, CA Developed drainage study and storm water quality management plan for redevelopment of the old C.ourthouse block into a residential tower.
Mercado del Barrio Mixed Use Development ( sun Diego, CA Coordinated LID design from entitlement through final engineering with a fast track schedule, LID components included porous paving and bioretention areas for parking lot, which required detailed coordination between project geotechnical engineer and landscape architect.
Oceanside SpringFiili Suites Hotel I Ckeansrde, CA
Developed stormwater mitigation plan and BMP O&M manual for hotel site.
Designed LID bioretention BMPs in coordination with project landscape architect and geotechnical engineer.
Infrastructure Engineers, a Bowman company I Municipal Engineering Services ( November 9, 2023 90
Jon eckerr,
landscape Architect
Education
B.S. landscape Architecture,
The Ohio State University, 1978
Real Estate Land Development,
U,C. San Diego, 1994
Registrations
Registered Landscape Architect:
California (#2542), 1983
Ohio 11463), 1982
Arizona (#3©593),1996
Nevada (#1506)
Associations
American Society of Landscape
Architects
American Planning Association
Citizens Coordinate for Century 3
Urban Land Institute
Community Involvement
Urban Forest Advisory Board (Mayoral
Appointee), Member
Rancho de los Pensaqultos Community
Planning Group, Past Chair
Land Use Committee, Chair
Park Village Landscape Maintenance
District, Chair
City of San Diego Park and Recreation
Board (Mayoral Appointee), Member
{cp
Jon Becker has provided management and design for bath public and private developments in many locations throughout the U.S and Mexico, with most of his experierace focused in the Southwest. His background includes both physical and policy planning, with his physical planning experience ranging from half -acre infill sites to several -thousand -acre walkable community developments,. He designs urban settings, residential housing communities, park developments and commercial facilities. No matter how small or large the project, his focus has always been to create livable neighborhoods with a sense of place. Jon's master plan projects integrate housing, commercial, school, and park developments with multi -modal linkages. His policy planning experience has Included the preparation of specific plans, permitting for planned residential developments, tentative maps, conditional use permits and environmentally sensitive lands. Much of his design experience has been in support. of environmental permits such as EMS, Army Corps 404 permits, U.S. Fish and Wildlife, California Fish and Game, and Coastal Commission permits. Jon has also served as an expert witness and consultant in land use planning. Additionally, he has completed many successful park projects (some award winning), open spaces, streetscapes, commercial protects and golf courses.
Experience
Aviara Community Park I Carlsbad, CA
Landscape architect of the master plan and supervised the preparation of construction documents and construction observation, for a 28 -acne active -use community park,
[3ennery Ranch Neighborhood Park I San Diego, CA
Located In the Ocean View Hills community, L nnery Ranch Neighborhood Park provides nine acres of population -based park land In the park deficient community, The design process started with two public workshops with the community.The initial workshop focused on gathering the community's Input .and vision for the future park site. PDC, a Bowman company was then able to weave community input and city comments into a cohesive design that was presented to the community in the subsequent workshop where we received approval from the Ocean Views Recreation Council. This allowed us to present to the City of San Diego Park and Recreation Board where we received unanimous approval of the project, Park design included open play turf area, drought tolerant landscaping, multiple tot lots, fitness stations, two half -court basketball courts, skate plaza, bicycle playground, pre -fabricated comfort station, 75 stall parking lot, decomposed granite walkways with overlooks, drinking fountains, benches, picnic tables, shaded structures, and a trai)head connection to Qtay Valley Regional Park.
ZianaTownhounes I La Jolla, CA
Landscape architect responsible for preparing planting and irrigation sueetscape plans for the frontage alone the new residential project fronting Torrey Pines Road.
Infrastructure Engineers, a Bowman company j Municipal Engineering Services I November 9, 2023
Jon * esker, RLA, AKP
Landscape Architect
The streetscape planting followed the La Jolla Shores Planned District Ordinance requirements, the cily's street tree requirements, and the city's water audit requirements. To achieve a water -efficient outdoor environment, a drought -tolerant pallet of plant material was used and serviced by three types of irrigation systems; low -volume spray, drip tubes, and drip emitters. Custom designs for fencing and gates were provided,
Rancho Bernardo Road Widening San Diego, CA
Landscape architect for the widening of the public street into an adjacent commercial center. As part of a Public Facility Financing Plan improvement project, the stakeholders required photo simulations for the road expansion illustrating retaining wall design themes and landscape as well as vehicular arid pedestrian barriers.T'he construction documents were prepared for detailed wall design, planting, irrigation, details and specifications processed through the City of San Diego.
Pacific Coast Highway I Sun Diego CA
PDC, a Bowman company's landscape architects provided conceptual design, community review/approval and construction documents. The streetscape design included exposed aggregate and brick., irrigation, drainage and palm trees along the highly visible roadway.
Reclaimed Water Retrofit, City of San Diego 15an Diego, CA Landscape architect providing Irrigation retrofit designs to meet the city's program to deliver recycled water to open space and park areas The development projectwas for Maintenance Assessment Districts (MAD) and three community parks.
Jamul Fire Station j lamul, CA
Land archite.ct/pianner for the Rural Fire Protection District (RFPD) Fire Station site project within the larger Peaceful Valley Ranch. The project was for updating the discretionary site plan concurrently while updated the construction documents for the proposed fire station.
SDCRM Lo Jolla, CA
Landscape architects on the multi -disciplinary team providing irrigation design for the streetscape and on -site improvements along La Jolla Scenic Drive and North Forrey Pines Road in the 11CSD area. A recycled water irrigation system was designed with drip irrigation within the public right-of-way, the on -site parking, drop-off areas, viewing garden and hillsides.
North Embarcadero Visionary Plan I Sun Diego, CA
t.andscape architect on the multi-discipl€nary team providing irrigation design for the streetscape of this promenade along the San Diego Bay.The low $low irrigation design required detailed coordination amongst multiple disciplines In the urban setting.
Infrastructure Engineers, a Bowman company I Municipal Engineering Services I November9, 2023 92
V
. 7 ;
a «mom l z «
•
$/1+ 24th
Qualifications, RelatedExperience and
References
ua
cations, *elate x erience an rri', eferences
The proposed IE team members exhibit the interpersonal skills, level of integrity, thoroughness, proactive approach and technical competence required by the city_ Our staff has the proven ability to multitask and to work with minimal supervision that is required to meet the city's current staffing and project needs.The team has a diverse experience in a variety of street improvement, water and sewer, storm drain, grading, traffic, vertical construction and environmental projects.
The various organiza'lona structures in this proposal illustrate our project team structure and lines of communication.
Resumes for these staff were 'aka provided.
Sid Mousavi, MSCP, PE will act as Principal -in -Charge. At IE Sid is the Senior Principal. Sid has over 35 years of experience in engineering projects covering a wide range of municipal management, civil engineering, transportation, public works, construction management, traffic engineering, community development and redevelopment, parks and recreation facilities, and public and private land development. Sid is responsible for the direction and administration of internal services, Cyril engineering design, city services and other corporate management responsibilities and matters. Prior to joining IE, Sid's accomplishments included serving as City Manager, Director of Public Works, and City Engineer for various cities in Southern California, with responsibilities for directing and administering such functional elements as engineering, planning, building &safety, facilities and equipment, landscaping, streets, environmental services, transportation, transit and other municipal services. Responsibilities also included communication with city councils, city commissions, other city departments and governmental regulatory agencies, utility companies, contractors, consultants, and the general public, Sid has performed the entire spectrum of engineering activities, which include engineering investigations, conceptual and feasibility studies, planning f scheduling, design, specifications, cost analysis, cost estimating, contract negotiations, construction management and engineering support services, Sid has served as the contract City Engineer for the City of Bell Gardens, City of Montebello, City of kwindale, City of La Puente and City of Baldwin Park.
Masoud Sepahl, PE, LEER GA will serve as City Engineer and Director of Construction Services. At lE Masoud is the Principal of Construction Management Services. Masoud has over 35 years of experience working for both public agencies in addition to the private sector, managing a variety of large and complex public works and capital improvement projects. He has held various leadership positions in managing a variety of projects for major public works programs. As the City Engineer for the City of Placentia, he was responsible for delivery of many projects. As the Director of Construction Management for the Los Angeles Metropolitan Transportation Authority, Masoud was responsible or the southern portion of the Crenshaw f LAX Transit Project. During his tenure with LA Metro, Masoud was responsible for management of all construction on the Southern segment of the project, including major utility relocations. Working for the City of Los Angeles for 10 years, Masoud held various positions, managing many types of public improvement projects as welt The following is a partial list of projects that Masoud has successfully managed over the last 35 years.
Douglas Benash, PC, QSP I QSD will serve es Development Engineer and Water Quality Engineer, Doug has more than 30 years of experience in municipal engineering, construction management, contract administration, design experience, and regulatory compliance. In working with small jurisdictions as a City Engineer, he has been involved in all aspects of the projects that cities have designed and constructed.This includes coordinating with local, county, state and federal agencies,, and various utilities to ensure. successful project completion, Douglas understands the level of detail and problem -solving skills required to complete high -profile projects on time and within budget He provides this level of expertise as projects are developed, designed, and constructed. Douglas also manages capital improvements, providing quality design and management of public works projects to our client cities. He oversees and reviews the designs, studies, investigations, plan checks, surveys, and funding requirements for projects. He also facilitates and assists agencies in the bidding process, awards of contracts, initiation of construction and construction and project closeout. Douglas oversees proper file documentation, particularly for federally or state -funded projects, labor compliance, funding administration and project acceptance and provides full construction management,
Infrastructure Engineers, a Bowman company' Municipal Engineering .Services I November 9, 2023 93
ualifications, Related Experience and M eferences (cont.) Aidan Mousavi, MBA, PE, QSP / QSD will serve as Director of Design Services and NPDES Manager. At IE Aidan 1s the Principal of Design Services Aidan's professional focus Is primarify In the field of city engineering and environmental infrastructure by providing civil engineering assistance to Public Works and Engineering Departments. He works closely with cities to ensure compliance with the National Pollutant Discharge Elimination System (NPDES), Aldan has developed strategies for the efficient use of Rest Management Practices (©MPs), thus gaining a set of skills that not only assists municipalities with compliance but helps keep them under budget as well, Aidan is familiar with municipal protocols and works within these structures to conduct field inspections and develop annual compliance reports, As an MBA graduate, Aidan brings hts academic knowledge to IE to work with the firm's Operations Manager to manage all Capita( Improvement Program (CIP) and non-CIP pro)ects.
Per the RFP IE's"Related Experience and Client Reference List' appear in the "Appendix" of this proposal located hem, Infrastructure Engineers, a Bowman company I Municipal Engineering Services i November 9, 2023
111
Itl
Cost and Pricing
$$$A$$$$ ',', "."t Q1$$$$$$.$$$.'"
Cost and Pricing
PROPOSAL PRICE SHEET
A. City Retainer:
City Engineer
B. As -needed Traffic Engineer:
$ 5,320 per month
Attach the hourly rates for the various classifications that would be billed to the City under this category.
C. Public Works Right of Wav Permit Management and Inspection:
Attach the hourly rates for the various classifications that would be billed to the City under this category.
D. As -Needed Water Engineer.
Attach the hourly rates for the various classifications that would be billed to the City under this category.
E. As -Needed Development Engineer.
Attach the hourly rates for the various classifications that would be billed to the City under this category.
F. As -Needed Public Works/Capital Improvement Program Protects:
These services will be billed as a percentage of a project's construction cost. Specify the percentages for the services listed below for construction costs less than $499,999, construction cost between $500,000 - $999,999, construction cost between $1.000,000 - $4,999,999, and construction cost over $5,000,000:
1. Design Services _%
2. Pro}ect Management and Administration %
3. Funding Management _%
4. Construction Management _%
5. Construction Inspection _%
&pears on #¢te following pages
For Labor Compliance, attach the hourly rates for the various classifications that would be billed to the City under this category.
G. As -Needed Other Public Works Engineering Services:
Attach the hourly rates for the various classifications that would be billed to the City under this category.
H. NPDES Stormwater Compliance Consultant Services
Attach the hourly rates for the various classifications that would be billed to the City under this category.
42 Infrastructure Engineers, a 33owman company I Municipal Engineering Services I November 9, 2023 95
Cost an Pricin (cont.)
Due to our on -going partnership with the City Bell Gardens, we are providing 10% discounts on all the hourly rates listed here.
M other rates wilt be based on the Infrastructure Engineers 2022 - 2023 Hourly Rate Schedule.
The method of compensation for each type of service is as follows:
City Engineer Retainer. 55,320 lump sum per month
For the proposed retainer fee Infrastructure Engineers proposes to provide 8 hours per week of City Engineering services, The City Engineer / Deputy City Engineer will attend all City Council meetings and any Traffic Commission meetings, as requested by the Director of Public works. During other hours of the week, the City Engineer will be available to respond to any city inquiries via email or telephone catls.The retention payment will provide the city up to 35 hours per month of City Engineering Services. Any hours beyond 35 hours will be charged as extra at the following discounted hourly rate:
City Engineer: 5178 per hour. Discounted Rote for Bell Gardens: 5 760 per hour Deputy City Engineer; 5159 per hour. Discounted Rafe for Bell Gardens: $752 per hour As -Needed Traffic Engineer: Hourly Rate per Hourly Rate Schedule The Traffic Engineer wilt be available to respond to any inquiries from the city by email or phone calls during any business hors and attend any traffic commission meetings that the Director of Public Works may require. The discounted hourly ;Tiles for these services will be as follows:
City Traffic Engineer: $164 per hour. Discounted Rate for Bell Gardens: $ 7S2 per hour Deputy City Traffic Engineer: $161 per hour. Discounted Rate for Bel! Gardens: $145 per hour Water Engineer: Hourly Rate per Hourly Rate Schedule
The Water Engineer will be available to provide engineering consultation on various city water matters on an as -needed basis.
The discounted hourly rates for these services will be as follows:
Senior Water Engineer: $176 per hour. Discounted Rate for Bel! Gardens: $158 per hour Water Engineer: $158 per hour. Discounted Rate fir Bell Gardens: $142 per hour Development Engineer: Hourly Rate per Hourly Rate Schedule Services may include participation at meetings, attendance at the Planning Commission meetings, review of development plans or other assignments from the Community Development Departrnent.
The discounted hourly rate for these services will be as follows:
Development Engineer: $ 169 per hour. Discounted Rate for Bell Gardens: $152 per hour Public Works Right of Way Permit Management and Inspection: $113 per hour (hourly rates) The utilities / public works raermits, and inspection services will be provided at the following discounted rates:
Engineering Technician: $106 per hour. Discounted Rate for Bell Gardens: 595 per hour Permit Inspector: $113 per hour. Discounted Rafe for Bell Gardens: $102 per hour Public Works Projects
Other public works studies, reviews and projects not listed her will be charged at hourly rates as listed in the infrastructure Engineers 2022 - 2023 Hourly Rate Schedule (attached). A lump sum, not -to -exceed fee will be provided at the start of each task.
Infrastructure Engineers, a Bowman company I Municipal Engineering Services l November R 2023
Cost an Prkcine (cant.)
Capital Improvement Projects; Percentage of the total cost of final contract construction Capital improvement design fee-. will be based on the estimated cost of construction. Once the protect is defined, the engineering team will estimate the construction cost and, in accordance with the chart below, will set the design fee, After finalization of design and upon receiving formal bids for construction of the protect, the actual design fee will be determined, and the engineering design fee will be adjusted to reflect the exact amount.
Construction costs will be the average of three (3) lowest bids far the project if there are only two (2) bids, the average of two (2) bids will be used for construction cost.
• Construction cost less than $499,999 the design fee will be 8% of the construction cost.
Construction cost 5500, 040- 5999,999 the design fee will be 7% of the construction cost.
Construction cost 51,000,000 - 4,999,999 the design fee will be 6% of the corstruction cost.
Construction cost over $5,000,000 the design fee will be 5% of the construction cost. !n addition to these percentages, Infrastructure Engineers fees for program management, project management and administration will be 4% of the construction cost, 2% of the project management will be charged during design phase and the additional 2% will be charged during construction phase of the project.
In addition, funding management will be 1.5% for local funds and 2.5% for state and federally funded protects. Half of the fund management will be charged during the design phase and the other halt will be charged during the construction phase of the project.
Pnagram Ma,rtaoerl Prolect Manager
A program manager f project manager's role for every project in various stages of the project is as follows; PAWL r,
• Identify the funding for the project that will meet the funding eligibility. • Obtain funding approval from the funding agency.
• Wort with the City's Finance Department to clear the budgeting objectives. peslgn Stage:
• Work with Public Works Director to generate a concise project scope, • Work with the design group to get the project designed and ensure that the project wilt be within the time and budget established.
• Draft the staff report for the approval of the design.
B6asdingSSdgsc
• Advertise the project for bids,
• Work with City Engineer to open bids and provide bid analysis. • Draft the staff report for approval rat the lowest responsible and responsive bidder.
Censtrg ttion stage;
• Work with the construction manager to ensure the protect objectives are attained, • Oversee the construction process and work with funding agencies when necessary. • Draft the staff report for completion of the project.
Infrastructure Engineers, a Bowman company I Municipal Engineering Services I November 9, 2023 97
Cost and Pricin (cont.)
• Notify the County of the final City acceptance of the project.
Construction Management and Inspection: Percentage of total construction cost Upon on receiving the bids for the construction of a capital improvement project, the engineering team will prepare the fee for construction management and inspection services in accordance with the following chart. The fee will be calculated based on average cost of the three (3) lowest bids and,. if there are only two (2) bids, an average of two bids will be used_ • Construction cost less than $499,999 the CM services 2,5% 1- inspection services 4.S% fora total fez of 7% of the construction cost.
Construction cost 5500,000 • $999,999 the CM services 2,5r + inspection services of 3,5% for a total fee of 6% of the construction cost.
• Construction cost $1,000,000 - $4,999.999 the CM Services fee of 23%+ inspection services of 315 fora total fee of 5,5* of the construction cost,
• Construction cost over $5,000,000 the CM services fee will be 4.5% of the construction cost, Labor compliance will be charged on an as -needed basis and based on actual hourly rates of 5105 per hour per the Hourly Rate Schedule
NPDES: Hourly rates
All NPDES services will be provide on as -needed bases at the following discounted rates:
Program Manager: 516B per hour.
Engineering Associates: 5135 per hour:
inspector. $106 per hour.
Discounted Rate for Bell Gardens: $151 per hour
Discounted Rate for Bell Gardens: $122 per hour
Discounted Rate for Bell Gardens: S95 per hour
Other Services: Hourly rates not -to -exceed a negotiated lump sum Other fees will be based on infrastructure Engineers 2.022 - 2023 Hourly Rate Schedule attached to this proposal.
Civil Engineering Plan Checks: 65% of the plan check fees, based on Los Angeles County's latest fee schedule and hourly rate. If the city uses its "City Fees" for public works projects, then civil engineering fees will be charged at 90% of those city fees.
Plan check fees include first, second and third plan checks. Fourth and all subsequent plan checks will be at the plan checkers' hourly rate, The rate provided here is Infrastructure Engineers' discounted rates for the City of Bell Gardens only, due to our long-term relationship with the city. Expedited plan checks will be provided at 90% of the plan check fees. fourth and subsequent plan checks will he charged at 1.75 times the normal hourly rate, Plan Check Engineer; 51 SO per hour Discounted Rate for ROI Gardens: $135 per hour Notes:
Land surveying, geotechnical services, material testing and potholing for capital projects will be provided by subconsultanis.
The fee for these services will be a negotiated cost + 15°C, - Any other subco nsultant services that might be needed will be charge at a negotiated cost 4- 15%.
Hourly rate and the retainer fees are subject to increases atthe annual Consumer Price Index for All Urban Consumers (CPI -U}, Los Angeles area increase rates or a 5% inceease, whichever is greater, effective July 1, 2024 and all subsequent years.
Infrastructure Engineers, a Plowman company I Municipal Engineering Services I November 9, 2023 98
Cost and Pricing (cont.)
2022-2023 HOURLY RATE SCHEDULE
(effective March 1, 2022)
Project Manager
Prtndpd Engineer
Sender Dgtneer
Senior Pan Check Engineer
Plan Check Engineer
Msocaie Engineer
Assistant Engineer
Engineering Awoke"
Engineering Assistant
CAD Manager
CAD Deeper
CAD Technician
Engineering Technician
Principal Traffic Engineer
Senior Tragic Engineer
Tialiic Engineer
W4tater/WastewaterAVPDES
Senior Mier Engineer
Water Engineer
Program 'Angler (NPDES)
Impeder (NPDES)
EnkMoren naiSden6st
Suntlying
Propel Manager
Plan Checker
playa* & savoy •4
Survey /Myst
Survey Der (2 -ow+)
Surrey CHNI
(2-nen. mane roger)
Construction Management
Constec6on Manger
Reelden1 Engineer
Schad lenDorlra6ar
Mies Coordinate
Senior PW OIissrverAns ectar
Senior Per Otaervedirepednr
(Mardi vaTa)
PW Obseneolnspector
PWOhaenvoinspect r
(WAN inded
$238
$185
$180
$170
$175
$165
$165
$145
$135
$115
$150
$135
$110
$100
$105
$185
$170
$150
$167
$158
11 $110
$105
$186
$162
$150
$278
$1
$186
$163
$138
$130
$191
$113
$159
Community Development --
Environmental & Planning
Max
Manager
Son
Asocial. Parer
Assisted Planner
Pluming Technician
CEt3NNEPA Specialist
Environmental Specialist
Senor ErMNonmenel Pamer
Win: menial Planner 6
Fnvtomlenal Planner I
Environmental Technician
Municipal Engineering Supli
mMy Manager
�My Meager
City MP* CRY Engineer
rails Engineer
PC Lineer
Deputy h�Engineer
T
Plan Examiner
q'sp
Wooing Assistant
Engineering Technician
Building & Saiety
Building Oficial
Pan Check Engineer
Landscape Plan Chador
Senior Cetted Pam Waist
Cerfilled Access Plats Ersrel Ter Specialist
Code Entomer eat Manager
Code Enforcement 019cer
Senior Building inspector
Building Inspecbr
Grading homerior
Cormier Technician
$195
$189
$173
$167
5163
$153
$139
$129
$176
$98
$170
$165
$144
$100
$197
$160
$161
$176
5178
$140
5142
$100
$175
$165
$16565
$146
$145
$127
$120
$120
106
INFRASTRUCTURE
ENGINEERS
Pim
pate
Senior Fire hrspedor
Fire inspector
Counts Technician
Antitedural Serviress
Director $290
Steno Manager 5184
Senior Project Managed $178
Senior Ponli act
Project Anwar/Project $155
Se Job Captain aafMed $128
$105Job Captain Drafter
Program Management/Pune Outreach
Program Dtkector $184
Web Designer $15U
Media Specialtal $145
Pmgram Coordinator $135
Photiraerier
Outreach SS Sat $125
In $125
Production Assistant 585
Fund Administrator $138
Labor Compliance Coordinator $105
Administrative & Clerical Services
tkgentaerfSupervlsor Admirisbetas Assistant $�
Cie&Typist $s0
Other Charges
Delivery ryas f9) Bme of b60rgAille(Crum* federal lNdddAie $110 Travel Coat+ 15%
Reimbursements Cost+ 15%
$165
5154
$143
$138
$120
$93
Adaklm al beenr d.uulecata a may be added to the abov.1W throughout the year a Paw po.klon .r. crated. The above Is la for straight time. Overtime wit be charged at 1.5 times. Sunders end Holidays at. champed at 2.0 tie,.e the ehndw d thee. Deposition and court .ppeararne ..8 be shamed at 1.0 Aimee the listed being rates. Hourty mina and the Mahler Nos are subject to Inm.ases at the annual Consumer Pie. Index fur Al Urban Consomme tCPI.IA, Los Angeles County ctncnw a . 0% lesresse. s whicheverwhichever subsequentwh • July 1, 2024, .and subsequent yews. Yke *di b
infrastructure Engineers, a Bowman company I Municipal Engineering Services I November 9,2023 99
Additions or Exceptions
ADDITIONS OR EXCEPTIONS TO THE CITY'S REQUEST FOR PROPOSAL IE has no additions or exceptions to the provisions and conditions of the city's standard professional services contract.
Infrastructure Engineers, a Bowman company I Municipal Engineering Services I November9,2023
Per di n g Ut gOtio n
� !� ■�!� � � :� :__� :� � ®-®,
«yam■■® +$f
Pending Litigation
IE has not been involved in any substantiated complaints, litigation, legal proceedings, or investigations by a regulatory authority In the last five years.
Infrastwcture Engineers, a Bowman company I Municipal Engineering Services I November 9, 2023 101
10009Re CONPENSAU00
MW EMPLOYERS LIABILITY
B ANY PROIRIETORR III ER,T.xrY'IJTI
OFRLER � DE ERCU 1WO
• diersistory in me
Rya, ammoasks
RI OP OPEHAT bolva
Insurance
ACC,R
CERTIFICATE OF LIABILITY INSURANCE
THIS C ERTIRCATE IS ISSUED A5 A MATTER OF MFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS
CERTIFICATE DOES NOT AFFIRMATIVELY DR NEGATIVELY AMEND, EXTEND ORALTER THE COVERAGE AFFORDED BY THE POLIQES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPIR;SENTATTVE OR PRODUCER, AND THE CERTIFICATE HOLDER ANT: BtM - holder M an ADDITIONAL INSURED, the polls -Wes) must have A tt SUBROGATION IS WAIVED, aub)act ro Bn terms end conditions ditto poky, ea taln poles m, this cartttlute does not confer rights to the certificate holoer In lieu of such a ndonesrenl ai)..
PRODUCER
qeh Agenq, LLC
P.O. Ban 219
Timonium
IntruNaAi a Engineer', a Barmen Company
3080 Satan Stern
Bate 250
Brea
MD 21094
A
1410)892-7800
I'. . 0. Ione or he endorsed.
n M erld0 t. A sunmem on
elnaperKTHIC. Om
WEIRESEEAFWRmNS COVERAGE
DEN Elm Insistence Co
Property Co. OfAMIN ,
mum,O : Beidey Insionnee Company
MARRED:
NIICREA
E:
CA 92821 MUMF;
COVERAGES
CERTIFICATE WARIER 22-23 INENSTSCSE9 D
REVISION NUMBER:
TIN81a TO CERTIFY THAT THE POLICIES Of I NBLRANCE LISTED BELOW HAVE BEEN ISSUED TO THE MIMEO NAMEDABOVE FOR THE POLICY PERIOD INDICATED. NOTMITHSTANDINO ANY REQUIREMENT, TEMM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHCH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AF FORDED BY THE POLICES DESCRIBED HEREIN 18 SUBJECT TO ALL THETERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLIDN. L/31TB 8NONN RAY HAVE BEEN REDUCED BY PAID CLAIMS.
TYPE DEINEURANCE
OCCUR
N
NIA
Printery Professional 8 Polite en tab
Exams Protai ions d POh10On Litany
8306,)047645
8108113204 CO 1513112022
CUPSJ3DS074
101
418/21PX122
00,3112022
013,312023
0&31,2023
06121120'23
OM col moan)
0,ADI
,000,000
1, A00
2,000.000
i 2,000.000
c.oaa,Rr O a
via sa,w,�rs
WO, v' WOW Ter wow)
t Lv rra.rLuty lFr edaxret
WWT ER IP A: n,ns=_:
1 swan. a
0 1.
,000
26.000,000
DE4112023
, DESCRIPTION Of OPERATIONS I LOCATORS! WHOLES (ACM 101, AaalbaY RrrM• eNWu, moor he mod d■ were .Elora le ARAMs,* 8 ragAbed by an Insured written oor end, aaeaAcd pier lo min foss, the cordate Inkier A en Add#bnal haled on a p *eery end Non-CorEbu ry Nabs under ha Ganrsl and Auto UMW P040ba. If weaned by in Insured waaen wired, executed prior la any bas, Waiver al Su4Dpallon Is provided for General, Aub, and Workers Compensation Polices Umbrella Pricy follows form over Oe,eM, Aub, and Empoyere Ley Policies. 30 day make of =volition, 10 day for non-payment
}r'nto, !. I
_EL EACH ACCIDENT
DISEASE -EAENPLOYEE
1200, E- POLICY LIMIT
Each CIelmlAggregete
Eames Ead1 CIaAnIASgr.
Total LIME
• Evidence of Coverage •
ACORD 21 (2011503)
CANCELLATION
1,000,000
1,t
1,000, 000
5,000,000
5,000,000
10,000,000
SHOULD ANY OF TIE ABOVE DF1CRISEO FDLILlE1 BE C.N CEL.= BSPORE THE E7PINATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE MTh THE POLICY PROVISIONS.
O 1151.2016 ACORD CORPORATION. AI rights reserved.
The ACORD name end logo re registered marks of ACORD
Infrastructure Engineers, a Bowman company ( Municipal Engineering Services ] November 9,2©23 -•102
1 Appendix
. :, ' ' , s'
Si
000:00, ,10100000,
Client Contact
Daniio Batson
Related Experience and Client Reference List
Montebello Boulevard Widening Project
City of Montebello, CA
"2021 American PubI c Works Association Project of the Year" award winner.
Phase II of the Montebello Boulevard Bike Lane and Sidewalk improvement project included design, preparation of PS&IE. for roadway improvements and widening, pavement rehabilitation, concrete improvements. sidewalk improvement, utility adjustments, ADA improvements, Class li bike lane, traffic signal improvements, pedestrian lighting, and landscaping, bioswales along center medians and irrigation improvements.
Address
1600 W Beverly Boulevard
Former Director of Public Works Montebello, CA 90640
323.889.9976
Client Contact
Cesar Roldan
Public Works Director
323384.6274
[email protected]
Schedule
2017-2020
Team Members
Aldan Mousavi
Shawnt Babakhanian
Shawn Mousavi
Slauson Congestion Relief Project
City of Huntington Park, CA
Utilized Synchro modeling for signal and timing improvement. Upgraded traffic signal equipment, enhanced phasing operations, street widening, concrete improvements, coordination with Los Angeles county and various railroad agencies.The goal of the project was to study and design Improvements along the Slauson corridor to Increase capacity, reduce congestion and improve traffic flow. Design plans have been finalized.
Address
6550 Miles Avenue
Huntington Park, CA 90255
Schedule
2020-2023
Team Members
Aldan Mousavi
Shawnt Babakhanian
Shawn Mousavi
Infrastructure Engineers, a Bowman company I Municipal Engineering Services I November9, 2023 -103
Related Experience and Client Reference List (cont.)
Client Contact
Sam Gutierrez
Director of Public Works
626.960.4011
sguttier rers>baldwinpark.com
Client Contact
Julian Lee
Director of Public Works
310.603.0220 ext, 201
[email protected]
Downtown Beautification Project
City of Baldwin Park, CA
Replaced ex/sting streetlight and traffic signal Infrastructure with new decorative infrastructure designed to identify and create visual points of interest that highlight and activate the t3aldwin Park community, Branding included streetscape enhancements and decorative poles designed to tie in with the new infrastructure including, but not limited to, decorative pavement in the parkway and crosswalks, entry monument signs in the center medians, and installation of a public art centerpiece on Ramona Boulevard.
Address
14403 Pacific Avenue
Baldwin Park, CA 91106
Schedule
2013 2020
Team Members
Aldan Mousavi
Shawnt Babakhanlan
Shawn Mousavi
Long Beach Boulevard Improvement Project
City of Lynwood, CA
"202a American Public Works Association (APWA) Project of the Year" award winner. IE provided construction management, inspection, and labor compliance for the resurfacing of 192,779 sq. ft. of roadway. Also included renovating sidewalks, driveway approaches, curbs and gutters, and constructing six new bus pads. Beautification enhancements included the removal and replacement of 23 trees, construction of landscaping in median islands with irrigation systems, and the installation of a city monument sign. Existing stre.etiights were relocated, and traffic signals were Improved at two intersections,
Address
1 1750 Alameda Street
Lynwood, CA 90262
Schedule
2017 2020
Team Members
Aldan Mousavi
Shawnt Babakhanian
Shawn Mousavi
Infrastructure Engineers, a Bowman company I Municipal Engineering Services November 9, 2023 104
Related Experience and Client Reference List (cunt,)
Client Contact
Michael B.O'Kelly
City Manager
562,806,7702
rnokelly@bel [garden s.org
Client Contact
Sam Gutierrez
Director of Public Works
626.960.4011
[email protected]
Water Weil #1, Booster Stations and Reservoir
City of Bell Gardens, CA
New reservoir provides fire flow and operational benefits to customers mitigating need for irnported MWD waterThe city's well was turned off due to reaching notification limits for PFOS. IE worked with the state to obtain funding for the project including treatment for the well water prior to entering the reservoir, then booster station.The work involves direct coordination with the state and DDW for compliance with permitting and operational permits.
Address
14403 Pacific Avenue
Baldwin Park. CA 91706
Schedule
2018 - 2020
Team Members
Aldan Mousavi
5hawnt Babakhanian
Douglas Benash
Shawn Mousavi
Active Transportation Program (ATP) Cycle
City of Baldwin Park, CA
iE was required to provide Plans, Specifications and Estimate (PS&E) for intersection improvements of 20 unprotected crosswalks in the City of Huntington Park. Features include ADA ramps, bulb -outs, advanced yield and stop markings, countdown signals, updated pedestrian signs, repainting exiting marking 1 pavement labels and crosswalks.
Address
1440.3 Pacific Avenue
Baldwin Park, CA 91706
Schedule
2021 - 2022
Team Members
Aldan Mousavi
Shawnt Babakhanian
Shawn Mousavi
Infrastructure Engineers, a Bowman company J Municipal Engineering Services November 9, 2023 tO5
Related Experience and Client Reference List (cant.)
Client Contact
Cesar RoWan
Public Works Director
323.584.6274
[email protected]
Client Contact
Sam Gutierrez
Director of Public Works
626,960.41)11
scluttierrertuba Idwinpark.corn
Linear Greenway
City of Huntington Park, CA
IE assisted with the City of Huntington Park to obtain a $3.5 million grant for urban greening to construct and revitalize ten contlgrrous parcels within the City of Los Angeles Department of Water and Power right of way. IE prepared design plans and specifications for the work to be performed associated with the grant requirements. Scope included mass grading, pavement and concrete improvements, designated bike path, planting and landscaping, irrigation, dry stream beds and various site amenities.
Address
6550 Miles Avenue
Huntington Park, CA 90255
Schedule
2018 - 2019
Team Members
Aldan Mousavi
Shawnt Babakhanian
Shawn Mousavi
San Gabriel River Commuter Bikeway Project
City of Baldwin Pork, CA
Preparation of design plans and specifications for the construction of a commuter bike path for the City of Baldwin Park_ The work also included direct communication with City of Baldwin Park staff, Los Angeles Flood Control District, and US Army Corps, for permitting purposes. Several reports were coordinated for submittal including Hydrology report, Geotech report, Cultural report. and NESMI report.This project has been active with field visits, design, and coordination with subconsultants and city staff buf construction for the bike path and the landscaping began in October (A2022,
Address
14403 Pacific Avenue
Baldwin Park, CA 91706
Schedule
2018 - 2022
Tears Members
Aldan Mousavi
Shawnt Babakhanian
Shawn Mousavi
Infrastructure Engineers, a Bowman company I Municipal Engineering Services I November 9, 7023 - 106
Related Experience and Client Reference List (cont.)
Client Contact
Steve Easel man
Planning Director
626.746.5002
[email protected]
Client Contact
Gus Romo
Community Development Director
562.806.7724
[email protected]
CEQA for 6th Cycle Housing Element
City of Shafter, CA
Environmental review of the City of Shatter Housing Element Update project and completed an Initial Study/ Mitigated Negative Declaration (1S / MND) in compliance with local requirements, and CEQA guidelines (Section 15070).
Evaluated existing conditions, the potential adverse effects of project implementation (individual and cumulative) and appropriate measures to mitigate such effects. The Draft 15 / MND was circulated for a 30 -day public review period to the public, responsible agencies, and trustee agencies.
Address
336 Pacific Avenue
Shaffer, CA 93263
Schedule
202.2 - 2023
Team Members
Malia Durand
Jason Wasmund
John Moreno
Cameron Lukos
CEQA Analysis and NINE) for Water Well #1
City of Bell Gardens, CA
IE prepared the initial Study (IS) and Mitigated Negative Declaration (MND) for this proposed project. Associated technical studies included:ll Water Quality and Hydrology; 2) Air Quality and Greenhouse Gas Emissions; 3) Noise; 4) Energy; 5) Traffic impacts; 6) Soils; 7) Biological; and B) Cultural. Additional tasks included public outreach and community engagement,
Address
7100 Garfield Avenue
Bel Gardens, CA 90201
;Selheduie
2019 - 2020
Team Members
Malia Durand
Jason Wasmund
John Moreno
Cameron Lukos
infrastructure Engineers, a Bowman company ( Municipal Engineering Services J November 9, 2023 107
si
ant Fundin_ Sources aine
The IE team has written and been awarded countless grants for our clients in the past, including many funding sources that our clients were not aware of We are always on the lookout for funding sources for public works projects, We have extensive knowledge of funding and grant opportunities and designated staff are focused on this task so that we may assist our clients in stretching their infrastructure and development budgets..
Some of the grants we have obtained for clients include Safe Routes to School, Highway Safety Improvement Program, Metro Call for Projects, Active Transportation Program, RAC Grant, SB 1, State Transportation Improvement Program, interregional Transportation Improvement Program, Regional Transportation Improvement Program and State Highway Operation and Protection Program, among others.
Spedfrcallly, for the City of Bell Gardens, we have been involved in and been awarded the following grants on behalf of the city:
Metro C ail far Projects Cycle 2015
ttM!Transprrtf t1crrr rear{'
RAC Grant
�5af� �5 Sz'ttiiaisl� ,
Safe Routes to Schools
pt. of Transportation
for Pro
y �ateay rrttfsrtrv�azr+�s
y Safety Irnprovennen
ntersection Improvements (Florence Ave at Ira Ave & $992:072 iatrc neria Rd)
Various Streets
'Cat 1 "fit
Citvwvide Outreach
hell Gardens HS> Garfield ES
M . e licsi i 4h rfr iisifi
Eastern Ave Hesurfactnr3
h.4
Ord 9'ark Transit
Eastern & Florence Avenue
Ga eId Ave, and Loveland St.
us Vehicle Replacemen
$2,200,182
Infrastructure Engineers, a Bowman company Municipal Engineering Services I November 9, 2023 -108
Subconsultants
AVANT-GARDE - GRANTS, FUND MANAGEMENT AND LABOR COMPLIANCE Avant -Garde is a long-time collaborator with OE, providing grant writing, fund management and labor compliance for projects in accordance with policy and procedural requirements, They are experts in determining eligible projects, and managing city funding programs. Avant -Garde also provides public relations coordination, community outreach efforts and conrmuinity relations, focus group moderation in English and Spanish, business development and corporate event planning.
DENNIS JANDA, INC. - LAN I SURVEYING
Dennis Janda, Inc. (WI) is a private corporation providing land surveying and mapping services and is a Certified Small Business Enterprise in the state of California.l'he owners and managers of DA have worked together for both public and private sectors clients, throughout Southern California since t997. Dias core staff has their roots [n the traditional disciplines of land planning, civil engineering, land surveying and mapping mainly working on development and public works projects throughout Californla.This experience using and participating in the evolution of surveying and mapping practices has helped in their ability to contribute in time and cost saving practices and processes from project conception through the development, to recording. Upon this foundation DJl added a diverse team of professionals using the best use of equipment and technology to contribute to their client's specific project goals and schedules.
ASSOCIATED SOILS ENGINEERING, INC.- GEOTECHNICAL ENGINEERING For more than 33 years, Associated Soils Engineering, Inc. (ASE) has provided geotechnical design, geology, and material and construction testing services throughout southern Calafornia.Their in-house laboratory is one of the most complete and efficient In the industry. ASE provides services to a vast range of clients including private Industrial and commercial owners, city and county public works, residential home builders, architects, construction managers, school districts and universities.
HANA RESOURCES, INC. - TECHNICAL STUDIES
HANA Resources, Inc. (HANA) is a full -service multidisciplinary environmental consulting firm that serves public and private sector clients throughout the United States. With its patented and proprietary technology, HANA applies scientific expertise, experience, initiative, and innovation to natural resource management. Their goal is environmental simplicity.IE will utilize HANA for various technical studies,
C BELOW - POTHOLING
C Below provides highly trained professionals and state-of-the-art equipment for all of their underground utility locating investigations to provide the best service possible. Their core services include Subsurface Utility Investigations, Vacuum Excavation and Utility t)eplction.They also offer all of the support services to make them a one stop shop, saving clients time and money. C Below's underground utility location service features the capability to locate metallic and nonmetallic utilities underground. Electrical, Communication, Water, Gas, Sewer and Storm Drain. They also specialize in locating reinforcing steel, post -tensioned and pre -tensioned cables and conduits In concrete and masonry structures. Each new C Below team member is trained fin all company processes before they are staffed on projects. The result is Potholers that can locate utilities arid have a greater understanding of a client's needs, This offers clients another key benefit as well, less dry holes. When pothole locations are marked out using Inaccurate information, the chances of spending a full day art the field without complete results are very high. C Below's technicians are trained to assess the situation before potholing beglns.This process can save time and money on a client's project by hitting their target the first time, infrastructure Engineers, a Bowman company I Municipal Engineering Services I November 9, 2023 1O)
Subconsultants
CITY TRAFFIC COUNTERS (CTC) -TRAFFIC COUNTS
City Traffic Counters (CTC) will provide Traffic Counts. Overall CTC provides a wide range of services that Include 24 Hour Automatic Machine Count, 24 Hour Vehicle Speed Profile Sampling, Intersection Turning Movement Counts, Parking Occupancy Counts, Neighborhood Speed Counts, Radar Spot Speed Surveys, Intersection Configuration Layout, Bikes / Pedestrian Crosswalk Counts, Vehicle Classification Counts and Transit Ridership /Occupancy Survey, OPTIONAL SERVICE: INFRASTRUCTURE ARCHITECTS
infrastructure Architects, Inc. ()Arch) was incorporated in 201 7 in the state of Califvrnia.The fundamental line of business for Infrastructure Architect is facilities for municipalities. iArch has successfully worked with several municipalities helping with design of new parks, renovating and upgrading existing parks, planning and designing concepts for community centers, senior centers, retrofitting and tenant improvements for re -purposing the city offices, designing new arid retrofitting existing restroom facilities, roof and HVAC renovations and other types of facility for municipalities. A small portion of their work involves developers and national corporation such as Chevron and Shell corporations. Their staff is made of seasoned professionals that have many years of experience working with municipalities and private deveiopers.They take pride in partnering with the municipalities to create a better condition for the city residents as that is their ultimate goal and accomplishment. Their objective is to create a positive change anywhere that they provide their professional services, infrastructure Engineers, a Bowman company I Municipal Engineering Services I November 9, 2023 ---71t)
Who We Are
Infrastructure Engineers, a Bowman company's mission is to provide professional engineering, planning, environmental and municipal services to cities and counties throughout Southern and Central California. As a results driven engineering service provider focused on public sector assignments, infrastructure Engineers, a Bowman company provides services that include civil design, construction management, traffic engineering, community development planning, environmental services, water / wastewater engineering,and staff augmentation for municipal and state agencies.
Our History
Services
Markets
Headquartered in urea, CA, Infrastructure
Engineers, a Bowman company provides a
breadth of professional engineering, planning,
environmental, geospatial and municipal
infrastructure services to cities and count les
throughout Southern and Central California.
M of June 13, 2023, Infrastructure Engineers
has officially Joined Bowman. This change
provides a strong foundation for us to merge
our comprehensive skillsets while offering the
same level of commitment to our clients and
employees.
ettki',ff1
• Civil Engineering
• Community Nanning
• Environmental Studies
• Water / Wastewater
• Construction Management
• Traffic Engineering
• Survey & Geospatial
• Municipal
• Industrial
• Water/ Wastewater
• Technoiogy / Data Centers
• Residential
• Parks & Recreation
Infrastructure Engineers, a Bowman company j Municipal Engineering Services I November 9, 2023 all
About Bowman
Team Members.
With more than 80 offices nationwide, we
continue to add staff, services, and locations to
continue to provide the best development and
infrastructure services to our clients.
1,900+ Employees
20-k Fully Equipped Field Survey Crews
300+ Professional Engineers
60+ Professional Surveyors
1001 Hight -of -Way and Land Professionals
13 Environmental Specialists
90+ Planners and Designers
20 + Registered Landscape Architects
infrastructure Engineers, a Bowman company I Municipal Engineering Services l November 9, 2023 112
tr'cIinolog'cal adva,,c nn
Awards
Zweig Group - Hot Firms I.Jst - #9 (2023)
Engineering News Record
087 -Top 500 Design Firms (2023)
#69 -Top 500 Design Firms Pure Designers (202.3)
#22 - MEd -Atlantic Top Design Firms (2023)
#44 - Southeast - Top Design Firms (2023)
rf78 - New York -Top Design Firms (2023)
#57 -Texas & Louisiana -Top Design Firms (2023)
National Business Journals
NS -Washington Bus. Journal Largest Engineering Firm (2023) ff5 -Washington iFus. Javrnal Largest Landscape Architecture (20233) 418 - Louisville Business First Largest Engineering Firm (2023) #12 - Philadelphia Business Journal Largest Engineering Firm (2023) #17 - Phoenix Business Journal Largest Engineering Firm (2023) #42 - Dallas Business Journal Largest Engineering Firm (2023) MEP Giants - #8S (20221
Addendum
'T BELL GARDENS
MAX'. C WORKS DEPARTMENT
FiEU.GARDENS, Air-cINNIA '72',7,201-5"!22
REQUEST FOR PROPOSALS
FOR
MUNICIPAL. ENGiNEERINQ SERVICES
ADDENDUM NQ. 1
October 18, 2023
This addendum is being Issued for the REQUEST FOR PROPOSALS FOR MUNICIPAL
ENGINEERING SERVICES
Submit a proposal for these services with the full understanding and full consideration of this addendum.
This addendum is being issued to make the following changes:
1 The Proposal submittal deadline is extended from S:00 P.M. on Thursday, October 26, 2023 to 6;00 P.M. on Thursday, November 2, 2023.
2, In the Submittal Procedures/Deadline section, the tentative schedule is revised to read as follows:
Release of RFP Tuesday, October 10 2023
Deadline for Questions Thursday, October 1g 2023 5,D0 p.m.
Response to Questions Thursday_ October 26, 2023
I Cit CouncilInterviews ecorwith nmenrdarosens,ihonn Award Monday November 14, December l9 2023 m, Proposal Y F
I Y Y_
3, In the Method of Compensation section. "Traffic Engineer Retainer' is revised to read 'As -Needed Traffic Engineer," and the corresponding Compensation Method for this Work item is revised from "Lump sum per month" to °Hourly rates." Sin eroly,
Berner o Irarg
Director of Public Works/Facilities
The proposer shall individually identify and acknowledge receipt c4 this addendum by signing and enclosing a copy of this forth in his/her proposal submittal. Failure, to do so may result in disqualification of his/her proposal.
10/17/23
Signature of Proposer Date.
Infrastructure Engineers, a r . n company 3080 Saturn Street, #250, Brea, CA 92821 Proposer Firm Name and Address
infrastructure Engineers, a Bowman company I Municipal Engineering Services E November 9, 2023 - -113
October 30, 2023
A t dendu cont.)
CITY OF BELL GARDENS
PUBLIC WORKS DEPARTMENT
8327 GARFIELD AVENUE • BELL GARDENS, CALIFORNIA 40201-6122 (582) 80&-7770 FAX (562) 606-7789 • VsINAN,BELLGAROENS.ORG
REQUEST FOR PROPOSALS
FOR
MUNICIPAL ENGINEERING SERVICES
ADDENDUM NO.
This addendum is being issued for the REQUEST FOR PROPOSALS FOR MUNICIPAL ENGINEERING SERVICES.
Submit a proposal for these services with the full understanding and full consideration of this addendum.
A. This addendum is being issued to make the following changes:
1. The Proposal submittal deadline is extended from 5:00 P.M. on Thursday, November 2, 2023, to 5:00 P.M. on Thursday, November 9, 2023.
2. In the Submittal Procedures/Deadline section, the tentative schedule is revised to read as follows:
Release of RFP Tuesday, October 10, 2023
Deadline for Questions Thursday, October 19, 2023 5:00 p,m.
Re se to Questions Monday, October 30, 2023
Proposal Due Date Thursday, November 9, 2023
Interviews with Proposers, if necessary ' Tuesday, November 21, 2023 City Council Recommendation of Award Monday, December 11, 2023 m.
B. This addendum is being issued to incorporate the following Questions and Answers ("Q&A°) into the RFP:
1. Q: Are firms required to submit a response for all the services (entire scope of work) or may they choose which service areas to respond to? We understand that it is the intent of the City to select a single Consultant to provide services? A: As stated in the RFP, it is the intent of the City to select a single Consultant to provide the requested municipal engineering services; however, the City reserves the right to select one or more Consultants to provide as -needed municipal engineering services through this RFP Firers may choose which Scope of Work categories to respond to; however, the City's preference is to select one firm (ie__ the same firm) to provide the services under .Scope of Work categories A. (City Engineer fRetainer), B. (As -Needed Traffic Engineer), C. (Public Works Perrnii
Infrastructure Engineers, Qa Bowman company I Municipal Engineering Services I November 9, 2023 -114
Addendum (cont.)
Addendum No. 2
RFP for Municipal Engineering Services
Management and Inspection), D. (As -Needed Water Engineer), E. (As -Needed Development Engineer), and H. (NPDES Storrnwater Compliance Consultant Services). The City may select one or more firms fa provide the services under Scope of Work category F, (As -Needed Public Works/CIP Project Design, Project Management & Administration, Funding Management, Construction Management, Construction Inspection, and Labor Compliance Services).
2. Q: Our firm Is unfamiliar with and has never been subjected to a fee structure that is based on a percentage of average construction low bid results. Please consider revising the method of compensation for As Needed Public Works l CIP Design, Protect Management & Administration, Funding Management, Construction Management, Construction Inspection and Labor Compliance Services to Hourly rates, not -to -exceed a negotiated scope and allowance. The City's determination on this item may affect our ability to propose.
A: Submit a proposal in accordance with the RFP Method of Compensation and Proposal Format and Content Requirements sections.
3. Q: Can firms submit on some parts of the scope, or does the City want only comprehensive proposals for all scope items?
A: Refer to Answer to Question 1.
4. Q: How many contracts will be issued?
A: Unknown at this time,
5. Q: Is there any way for a further extension for the RFP due date — preferably to Tate November?
A: Refer to Section k1 of this addendum.
6. Q: Would the City consider an electronic only submittal rather than hard copy? A: Proposer must submit a proposal in accordance with the RFP Submittal Piocedures/Deadline section
7. Q: Should Attachment "B" —Acknowledgement of City's standard form Agreement be included with the proposal?
A: Yes.
B. Q: Does the City envision that this contract could be used to acquire support staff? Many other cities use the On -Call contract as a means of puling in outside support staff when that need arises. Having staff support as a part of the On -Call RFPs not only gives flexibility but catalyzes competition that results in lower billing rates for those staff as well.
A: As stated in the RFP, the City is seeking proposals for various as -needed, i.e., on -call, municipal engineering services.
Infrastructure Engineers, a Bowman company Municipal Engineering Services I November 9, 2023 -115 Page524of797
Adden
(cont.)
Addendum No. 2
RFP for Municipal Engineering Services
9. Q: The RFP mentions that the City has U. private firms in the past for the services mentioned in the scope. What firms did the City use? Could the City share any estimate based on the historic d- about the total number of personnel proposed or working currently along with the hourly rate and spending done on contract?
A: The City has previously contracted with Willdan and currently contracts with Infrastructure Engineers, previously known as Advanced Applied Engineering, for municipal engineering services.
10.Q: How many firms is the City planning on selecting? Is there a preference for firms who can provide all services listed in the scope?? A: The number of firms is unknown at this time. As stated in the RFF' it is the intent of the City to select a single Consultant to provide the requested municipal engineering services; however; the City reserves the right to select one or more Consultants to provide as needed municipal engineering services through this RFP
11.Q: Please specify the total budget allocated for this contract? A: The total budget allocated for this contract is unknown at this time since the number of Capital improvement Program projects will vary; and the City has not determined how many contracts will be awarded.
12.Q: Do the services need to be delivered onsite or is there a possibility for remote operations and performance?
A: Services will be delivered onsite and remotely. Refer to the RFP Scope of Work section.
13.Q: Please specify the anticipated start date of the project.
A: The anticipated effective date ter the professional services agreement is December 11, 2023.
14.Q: Are escalations to hourly rates allowed?
A: As part of their proposal, proposers may request an annual adjustment to the hourly rates after the initial year, not to exceed the percentage change in the Consumer Price Index for All Urban Consumers, Los Angeles area, for the 12 -month period ending September immediately preceding the agreement anniversary date. Any adjustment to the hourly rates would take effect on January 15r each year.
15. Q: Are there any CaIPERS concems we should be aware of? A The contracted firrn(s) shaft he responsible for any salaries and benefits of their respective employees as a direct result of providing the contracted municipal engineering services contained in this RFP, including any pension liabilities for employees of the firm(s). The contracted firm(s) shall not use any CalPERS retirees for any of the services contained in this RFP Infrastructure Engineers, a t3owman company Municipal Engineering Services November 9, 2023 -- - 116
Addendum (cant.)
Addendum No. 2
RFP for Municipal Engineering Services
16.Q: Can firms apply for a portion of a category? For instance, Category F lists Project Design, Project Man, <ment & Administration, Funding Management, Construction Management, Construction Inspection, and Labor Compliance Services. Are we able to provide just project management services, or are we required to fulfill all services listed in the category? A: Firms are required to fulfill all services listed within a respective category..
17.Q: Since some of the scope is for as -needed services and positions, how does the City recommend listing out deliverables needed and creating a work plan showing proposed hours for each retainer service as required in section 2:
Methodology of the Proposal Format and Content Requirements.
A: !t is up the proposer to provide a methodology to address the components in the Scope of Work.
18.Q: Is there any special consideration given to small or disadvantaged businesses?
A. No.
Proposers who have already submitted their proposal will be contacted to arrange for return of their proposal.
Sincerely,
Bernardo Iniguez
Director of Public Works/Facilities
The Proposer shall individually identify and acknowledge receipt of this addendum by signing and enclosing a copy of this form in their proposal submittal. Failure to do so may result in disqualification of their proposal.
10/31/23
Signature of Proposer Date
Infrastructure Engineers, a Bowman company 3060 Saturn Street, Suite 250, Brea, CA 92821 Proposer Firm Name and Address
Infrastructure Engineers, a Bowman company I Municipal Engineering Services I November 9, 2023 -117
PSA Acknowled ent
ACKNOWLEDGEMENT OF CITY'S STANDARD FORM OF AGREEMENT
I, the undersigned, certify that I, Sid Mousavi 'insert name) am the Senior Principal [insert title] of vararn„cuue Engineers, a Bowan company [insert firm name], the party making the proposal for award of an agreement for ENGINEERING SERVICES ("Proposer) and, on behalf of the Proposer, hereby:
Accept City's Standard Form of Agreement — check one box. lit/As is, without qualifications or modifications.
❑ As modified by attachment. [Proposer to provide]
I certify that I am authorized to sign this Consent Form on behalf of the Proposer Executed this 17th day of October , 2023 at Brea , Califomia.
Signature of Officer "' - Printed/Typed Name of Officer Sid Mousavi Title of Officer Senior Principal
44 Infrastructure Engineers, a Bowman company I Municipal Engineering Services I November 9, 2023 -118
INF'RAETRURTURE
ENGINEERS
Dcwrnan company
AWRd
CERTIFICATE OF LIABILITY INSURANCE
THIS C IFICATE fB ISSUED AS A MATTER OF RIFlDRMAI1ON ONLY AND CONFERS NO RIGHTS UPON THE CE7i71FICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED SY 114 POLICES BELOW. THE C ERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN TIIE ISSUING INSIS ERQ$), AUTHORIZED
REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER
IMPORTANT: Elbe dandlicats holder is an ADDITIONAL Sim, 1M poREPI99111 1( SUBROGATION IS YYAIVTE% subbsct to the lams and conditions of the policy, osridn policies trey certifl cote dote a oortfer tlgh45 tc tie► csitllldats holder in Eau of such andots rnentts). ncy, LLC
P.O. Box 219
Bowman Infmuucon Engines LTD
3080 Saban Scam, Suite 280
MD 21094
4 1410) 831-1
000
THIS tS ii3 CF3tTIFY7TIRT THE POUC ES CF IN9URANCE 119TT3! BELOW F1AVE BEEN ISSUE D TO THE INSU ED NA►tEDABOVI E )ICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM CNi CO84D ON OF ANY t OVERACT OR OTHER 0CC(N4ENT WTiH CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY T)+E POLICIES OESCRIeED HEREIN IS StJB.IE MI U9tONS AND CONDITIONS OF SUCH POLICED. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID Cl AIMS. 0813112023 0011312024 11MTS I t 25,000000
$ 1,000.000
1,000,00
Q 1,00000
lr5,O09,000
zr $50 0000
CEJIClertl,a OP °MATIONS I r 0CA! M$ I MOM= (ACoet) tea. AdeltlwW Miaerlai ibMdair. Mall M erearlesi a eves specs rs wq,eeed) i rldorsalrienfa GG0804, CC;rD414, G0379, CAFi29, CAT474 WC00313 are attached. N required by an inured wriEen comma, executed prior t0 wry loss, City o1 Ball Castel ns, b dR9cars. employees, apalrb and volunteers are an Additional bfsored on a primary and non-contbulory basis under the General and Auto Llabiey Po$dae. If rogtired by an Insured written conta* axsaRed prior to any bus, Waiver of Subrogsibn b wadded for General, Au o, and Works a Coaapesastion PoEciss Umbrella Policy Mows form over General, Auto, end Employer's Liability PoYeles. 30 day make of cancellation. day for
CEIRTIF
City of Beg Gardena
7100 Garfield Avenue
Bel Gardens
t_
ACORD 25 (2010103)
CA 90201
15 4
11NO15.5 ANY OF TIM ASOVE DNJk RN10 POMMES SE CANCELLED EERORE THE EXPIRATION DAYS THIGREOF, NOTICE WILL EE DELIVER= IM ACCORDANCE MATH TO POLICY PROVISIONS.
611080-2015 ACORD CORPORATION. Ali rights reserved.
Tba ACORD name and logo are registered make of ACORD
COMMERCIAL AUTO
THIS ENDORSEMENT CHANGES THE POLICY. PL E READ IT CAREFULLY.
VIRGINIA BUSINESS AUTO COVE ` = GE
EXTENSION ENDORSEMENT
This endorsement modifies insurance provided under the following:
BUSINESS AUTO COVERAGE FORM
With respect to coverage provided by this endorsement, the provisions of the Coverage Form apply unless modified by the endorsement.
GENERAL DESCRIPTION OF COVERAGE - This endorsement broadens coverage. However, coverage for any injury, damage or medical expenses described in any of the provisions of this endorsement may be excluded or limited by another endorsement to the Coverage Part. and these coverage broadening provisions do not apply to the extent that coverage is excluded or limited by such an endorsement. The folowing listing is a general coverage description only. Limitations and exclusions may apply to these coverages. Read all the provisions of this endorsement and the rest of your policy carefully to determine rights, duties, and what is and is not covered.
H. HIRED AUTO PHYSICAL DAMAGE - LOSS OF
USE-INCR UMIT
I. PHYSICAL. DAMAGE - TRANSPORTATION
EXPENSES- INCREASED UMIT
J. PERSONAL EFFECTS
K. AIRBAGS
L. NOTICE AND KNOWLEDGE OF ACCIDENT OR
LOSS
M. BLANKET WAIVER OF SUBROGATION
A. BROAD FORM NAMED INSURED
B. BLANKET ADDITIONAL INSURED
C. EMPLOYEE HIRED AUTO
D. EMPLOYEES AS INSURED
E. SUPP TARY PAYMENTS — INCREASED
LIMITS
F. HIRED AUTO — LIMITED WORLDWIDE
COVERAGE — INDEMNITY BASIS
G. WAIVER OF DEDUCTIBLE — GLASS
PROVISIONS
A. BROAD FORM NAMED INSURED
The following is added to Paragraph A.1., Who Is
An Insured, of SECTION I — COVERED AUTOS
LIABILITY COVERAGE:
Any organization you newly acquire or form
during the policy period over which you maintain
5O% or more ownership interest and that is not
separately insured for Business Auto Coverage.
Coverage under this provision is afforded only
until the 180th day after you acquire or form the
organization or the end of the policy period,
whichever is earlier.
B. BLANKETADDITIONAL INSURED
The following is added to Paragraph c. in A.1.,
Who Is An Insured, of SECTION II — COVERED
AUTOS UABILfTY COVERAGE:
This includes any person or organization who you
are required under a written contract or
agreement between you and that person or
organization, that is signed by you before the
"bodiy injury" or "property damage" occurs and
CAF1290321
that is in effect during the policy period, to name
as an additional insured for Covered Auto Liability
Coverage, but only for damages to which this
insurance applies and only to the extent that
person or organization qualifies as an "insured'
under the Who Is An Insured provision contained
in Section II.
C. EMPLOYEE HIRED AUTO
1. The following is added to Paragraph A.1.,
Who Is An Insured, of SECTION II —
COVERED AUTOS LIABILITY COVERAGE:
An "employee' of yours is an "insured" while
operating an "auto" fired or rented under a
contract or agreement in an "employee's"
name, with your permissions, while performing
duties related to the conduct of your
business.
2. The following replaces Paragraph b. in BS.,
Other Insurance, of SECTION IV —
BUSINESS AUTO CONDITIONS:
b. For Hired Auto Physical Damage
Coverage. the following are deemed to
be covered 'autos" you own:
© 2021 The Travelers Indenxrity Company. AI,slits reserved.
Includes copyrighted material of Insurance Services Office. Inc. with its pemilssion.
COMMERCIAL AUTO
(1) Any covered 'auto" you lease, hire,
rent or borrow; and
(2) Any covered *auto" hired or rented by
your "employee under a contract in
an "employee's" name, with your
permission, while performing duties
related to the conduct of your
business.
However, any 'auto" that is leased. hired,
rented or borrowed with a driver Is not a
covered "auto".
D. EMPLOYEES AS INSURED
The following is added to Paragraph A.1.. Who is
An Insured, of SECTION II — COVERED AUTOS
LIABILITY COVERAGE:
Any "employee of yours is an "insured" while
using a covered "auto" you don't own. hire or
borrow in your business or your personal affairs.
E. SUPPLEMENTARY PAYMENTS — INC D
UMITS
1. The following replaces Paragraph A.2.a.(2),
of SECTION II — LIABILITY COVERAGE :
(2) Up to $3,000 for cost of bas bonds
(including bonds for related traffic law
violations) required because of an
"accident" we cover. We do not have to
furnish these bonds.
2. The following replaces Paragraph A.2.a.(4),
of SECTION II — UABILITY COVERAGE :
(4) AM reasonable expenses Incurred by the
"insured" at our request. including actual
loss of earnings up to $500 a day
because of time off from work.
F. HIRED AUTO — LIMITED WORLDWIDE
COVERAGE — INDEMNITY BASIS
The following replaces Subparagraph (5) in
Paragraph B.7., Policy Period, Coverage
Territory, of SECTION IV — BUSINESS AUTO
CONDITIONS:
(5) Anywhere In the works, except any country or
jurisdiction while any trade sanction,
embargo, or similar regulation imposed by the
United States of America applies to and
prohibits the transaction of business with or
within . such country or Jurisdiction. for
Covered Autos Liability Coverage for any
covered "auto" that you (ease, hire, rent or
borrow without a driver for a period of 30
days or loss and that is not an "auto" you
Paoe2of4
lease. hire, rent or borrow from any of your
"employees". partners (if you are a
partnership), members (if you are a Nmited
liability company) or members of their
households.
(a) With respect to any claim made or "suit"
• ht outside the United States of
America, the territories and possessions
of the United States of America, Puerto
Rico and Canada:
(I) You must arrange to defend the
"insured" against, and investigate or
settle any such claim or "suit" and
keep us advised of all proceedings
and actions.
(Ii) Neither you nor any other involved
"insured" will make any settlement
without our consent.
(HI) We may, at our discretion, participate
In defending the "insured" against. or
In the settlement of. any claim or
(Iv) We will reimburse the "insured" for
sums that the 'insured" IegaIy must
pay as damages because of "bodily
injury" or "property damage" to which
this insurance applies, that the
"insured" pays with our consent. but
only up to the limit described in
Paragraph C., Limits Of Insurance, of
SECTION II — COVERED AUTOS
LIABILITY COVERAGE.
(v) We will reimburse the "Insured" for
the reasonable expenses Incurred
with our consent for your
investi , n of such claims and your
defense of the "insured" against any
such "suit", but only up to and
inckided within the limit described in
Paragraph C., Limits Of insurance, of
SECTION II — COVERED AUTOS
LIABILITY COVERAGE. and not In
addition to such limit Our duty to
make such payments ends when we
have used up the applicable Nmlt of
insurance in payments for damages.
settlements or defense expenses.
(b) This insurance is excess over any valid
and collectible other insurance available
to the "insured" whether primary, excess,
contingent or on any other basis.
O 2021 The Traveler Indemnity Company. NI fights reserved.
Includes copyrighted material of Insurance Services Office, Inc. with its permission.
CAF1290321
COMMERCIAL AUTO
(c) This insurance is not a substitute for J.
required or compulsory insurance in any
country outside the United States, its
territories and possessions, Puerto Rico
and Canada.
You agree to maintain all required or
compulsory insurance in any such
county up to the minimum limits required
by Focal law. Your failure to comply with
compulsory insurance requirements win
not invalidate the coverage afforded by
this policy, but we will only be liable to the
same extent we would have been liable
had you complied with the compulsory
insurance requirements.
(d) It is understood that we are not an
admitted or authorized insurer outside the
United States of America, its territories
and possessions, Puerto Rico and
Canada. We assume no responsibility for
the furnishing of certificates of insurance,
or for compliance in any way with the
laws of other countries relating to
insurance.
G. WAIVER OF DEDUCTIBLE — GLASS
The following is added to Paragraph D.,
Deductible. of SECTION II1 — PHYSICAL
DAMAGE COVERAGE:
No deductible for a covered "auto" will appy to
glass damage if the glass is repaired rather than
replaced.
H. HIRED AUTO PHYSICAL DAMAGE — LOSS OF
USE — IN ED UMIT
The following replaces the last sentence of
Paragraph A.4.b., Loss Of Use E , of
SECTION III — PHYSICAL DAMAGE
COVERAGE:
However. the most we will pay for any expenses
for loss of use is $65 per day. to a maximum of
$750 for any one "accident".
I. PHYSICAL DAMAGE — PORTATK)N
EXPENSES — INC ' Lf
The following replaces the first sentence in
Paragraph A.4.a., Transportation Expenses, of
SECTION Ill — PHYSICAL DAMAGE
COVERAGE:
We will pay up to $50 per day to a maximum of
$1,500 for temporary transportation expense
incurred by you because of the total theft of a
covered "auto" of the private passenger type.
CAF1290321
P
NAL EFFECTS
The following -:• • itionat coverage is added to
Paragraph AA, Coverage Extensions. of
SECTION I9 — PHYSICAL DAMAGE
COVERAGE:
Personal Effects
We win pay up to $400 for "loss" to wearing
apparel and other personal effects whidl are:
(1) Owned by an "insured"; and
(2) In or on your covered "auto".
This coverage applies only in the event of a total
theft of your covered "auto".
This Personal Effects limit does not apply to
"loss" to the covered "auto" or its equipment.
No deductibles apply to this Personal Effects
coverage.
K. AIRBAGS
The following is a• _ to Paragraph B.3.,
Exclusions. of SECTION III — PHYSICAL
DAMAGE COVERAGE:
Exclusion 3.a. does, not apply to "loss' to one or
more airbags in a covered "auto" you own that
inflate due to a cause other than a cause of "loss"
set forth in Paragraphs A.1.b. and A.1.c., but
only:
a. if that "auto" is a covered "auto" for
Comprehensive Coverage under this policy;
The airbags are not covered under any
warranty: and
c. The airbags were not intentionally inflated.
We will pay up to a maximum of $1,000 for any
one "loss".
L. NOTICE AND KNOWLEDGE OF ACCIDENT OR
b.
LOSS
The following is added to Paragraph A.2.a., of
SECTION IV — BUSINESS AUTO CONDMONS :
Your duty to give us or our authorized
representative prompt notice of the "accident" or
"loss" applies only when the "accident" or "kiss" is
known to:
(a) You (if you are an individual);
(b) A partner (if you are a partnership);
(c) A member ('f you are a limited liability
company);
(d) An executive officer, director or insurance
manager (if you are a corporation or other
organization); or
® 2021 The Travelers Irdemnky Company. M rights reserved. Page 3 of 4 Includes copyrighted material of Insurance Services Office. Inc, with its permission.
COMMERCIAL AUTO
(e) Any "employee" authorized by you to give
notice of the "accident or "loss".
M. BLANKET WAVER OF SUBROGATION
The following is added to Paragraph A.5.,
Transfer Of Rights Of Recovery Against
Others To Us, of SECTION IV — BUSINESS
AUTO CONDITIONS:
We waive any right of recovery we may have
against any person or organization to the extent
required of you by a written contract signed and
executed prior to any 'accident" or 'loss",
provided that the "accident" or "loss" arises out of
operations contemplated by such contract. The
waiver applies only to the person or organization
designated in such contract.
Includes copyrighted material of Insurance Services Office, Inc. with Its permission.
CAF1290321
COM C AUTO
THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. • NKET ADDITIONAL INSURED - PRIMARY AND
NON-CONTRIBUTORY WITH OTHER INSU " 1 NCE
This endorsement modifies insurance provided under the following:
BUSINESS AUTO COVERAGE FORM
PROVISIONS
1. The following Is added to Paragraph A.1.c., Who
Is An Insured, of SECTION II — LIABILITY
COVERAGE:
This includes any person or organization who you
are required under a written contract or
agreement between you and that person or
organization, that Is signed by you before the
'bodiy injury or "property damage" occurs and
that is in effect during the policy period, to name
as an additional insured for Liability Coverage,
but only for damages to which this insurance
applies and only to the Merit of that person's or
organization's liability for the conduct of another
"'muted".
CA T4 74 08 17
2. The following is added to Paragraph B.B., Other
Insurance of SECTION IV — BUSINESS AUTO
CONDITIONS:
Regardless of the provisions of paragraph a. and
paragraph d. of this part 5. Other. Insurance, this
insurance is primary to and non-contributory with
applicable other insurance under which an
additional insured person ororganization is the
first named insured when the written contract or
agreement between you and that person or
organization, that is signed by you before the
"bodily injury or "property damage" occurs and
that is in effect during the policy period, requires
this insurance to be primary and non-contributory.
2016 The Travelers Indemnity Company. AI rights resented.
Indudes copyrighted material of Insurance Services Oflce. Inc. with its permission.
COMMERCIAL GENERAL LIABILITY
THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY.
B NKET ADDITIONAL INSURED - AUTOMATIC STATUS
IF REQUIRED BY WRITTEN CONT CT (CONT - CTORS)
This endorsement modifies Insurance provided under the following:
COMMERCIAL GENERAL LIABILITY COVERAGE PART
The following is added to SECTION II — WHO I8 AN
INSURED:
Any person or o nIzation that:
a. You agree in a written contract or agreement to
include as an additonal Insured on this Coverage
Part; and
b. Has not been added as an additional insured for
the same project by attachment of an endorse-
ment under this Coverage Part ntnich Includes
such person or organization in the endorsements
schedule;
is an insured, but:
& Only with respect to liability for "bodily Injury" or "property damage" that occurs, or for "personal
injury" caused by an offense that is committed,
subsequent to the ' signing of that contract or
agreement and white that part of the contract or
agreement Is In effect; and
b. Only as described in Paragraph (1), (2) or (3) be-
low, whichever applies:
(1) lithe written contract or agreement specifical-
ly requires you to provide additional Insured
coverage to that person or organization by
the use of:
(a) The Additional Insured — Owners, Les-
sees or Contractors — (Form B) endorse-
ment CG 20 1011 8s; or
(b) Either or both of the following: the Addi-
tional Insured — Owners, Lessees or Con-
tractors — Scheduled Person Or Organi-
zation endorsement CG 20 10 10 01, or
the Additional Insured — Owners, Lessees
or Contractors — Completed Operations
endorsement CG 20 37 10 01;
the person or organization is an addiUonai in-
sured only if the injury or dam :,:= arises out
of "your work" to which the written contract or
agreement applies;
(2) If the wrtten contractor agreement specifical-
ly requires you to provide additional insured
coverage to that person or organization by
the use of:
CG D6 0402 19
(a) The Additional Insured — Owners, Les-
sees or Contractors — Scheduled Person
or Organization endorsement CG 20 10
07 04 or CG 20 10 04 13, the Additional
Insured — Owners, Lessees or Contrac-
tors — Completed Operations endorse-
ment CG 20 37 07 04 or CG 20 37 04 13,
or both of such endorsements with either
of those edition dates; or
(b) Either or both of the following: the Addi-
tional Insured — Owners, Lessees or Con-
tractors — Scheduled Person Or Organi-
zation endorsement CG 20 10, or the Ad-
ditional Insured — Owners, Lessees or
Contractors — Completed Operations en-
dorsement CG 20 37, without an edition
date of such endorsement specified;
the person or organization is an additional in-
sured only if the injury or damage Is caused,
in whole or In part, by acts or omissions of
you or your -subcontractor in the performance
of "your work' to which the written contract or
agreement applies; or
(3) If neither Paragraph (1) nor (2) above applies:
(a) The person or organization Is an addi-
tional insured only if, and to the extent
that, the injury or damage is caused by
acts or omissions of you or your subcon-
tractor in the performance of "your work"
to whichthe written contract or agree-
ment applies; and
(b) Such person or organization does not
qualify as an additional insured with re-
spect to the Independent acts or omis-
sions of such person or organization.
The insurance provided to such additional Insured is
subject to the following provisions:
a. If the Limits of insurance of this Coverage Part
shown in the Declarations exceed the minimum
limits required by the written contract or agree-
ment, the insurance provided to the additional in-
sured will be limited to such minimum required
limits. For the purposes of determining whether
C 2017 The Trawlers tide Company. All rtgm. reserved. Page 1 of 2
COMMERCIAL GENERAL LIABILITY
this limitation lies, the minimum limits required
by the written contract or agreement will be con-
sidered to Include the minimum limits of any Um-
brella or Excess liability coverage required for the
additional insured by that written contract or
agreement. This provision will not increase the
limits of insurance described in Section III — Limits
Of Insurance.
b. The insurance provided to such additional insured
does not apply to:
(1) Any "bodily injury', "property damage" or
"personal injury' arising out of the providing,
or failure to provide, any professional archi-
tectural, engineering or surveying services,
Including:
(a) The preparing, approving, or facing to
prepare or approve, maps, shop draw-
ings, opinions, reports, surveys, field or-
ders or change orders, or the preparing,
approving, or facing to prepare or ap-
prove, drawings and specifications; and
(b) S rvisoryr, inspection, architectural or
engineering activities.
(2) Any "bodily injury" or "property damage"
caused by "your work" and included in the
"products -completed operations hazard" un-
less the written contract or agreement specifi-
cally requires you to provide such coverage
for that additional insured during the policy
period.
c. The additional insured must comply with the fol-
lowing duties:
(1) Give us written notice as soon as practicable
of an "occurrence" or an offense which may
result in a claim. To the extent possible, such
notice should include:
(a) How, when and where the "occurrence"
or offense took place;
(b) The names and addresses of any injured
persons and witnesses; and
The nature and location of any injury or
damage arising out of the "occurrence" or
offense.
(2) If a claim is made or "suit" is brought against
the additional insured:
(a) Immediately record the specifics of the
claim or "suit" and the date received; and
(b) Notify us as soon as practicable and see
to it that we receive wrtten notice of the
claim or "sur as soon as practicable.
(3) Immediately send us copies of all legal pa-
pers received in connection with the claim or
"suit", cooperate with us in the investigation
or settlement of the claim or defense a Inst
the "suit", and otherwise comply with all policy
conditions.
(4) Tender the defense and indemnity of any
claim or "sur to any provider of other insur-
ance which would cover such additional In-
sured fora loss we cover. However, this con-
dition does not affect whether the insurance
provi.=d to such additional Insured is primary
to other insurance available to such additional
Insured which covers that person or organiza-
tion as a named insured as described in Par-
agraph 4., Other Insurance, of Section IV -
Commercial General Liabilty Conditions.
(c)
® 2017 The Travelers Indemnity Company. Al dads reserved.
CG D6 04 02 19
COMMERCIAL GENERAL LIABILTY
THIS ENDORSEMENT CHANGES THE POLICY. PLEASE REA
NKET AI DITI
CONT.' A S (A. C
SU
NALI
IT C
V Y
Su
RS)
This endorsement modifies insurance provided under the following:
COMMERCIAL GENERAL LIABILITY COVERAGE PART
1. The following is added to SECTION @I — ■ IS
AN INSURED:
My person or organization that you agree in a
"written contract requiring insurance" to include as
an a• • `•naI insured on this Coverage Part. but:
a. Only with respect to liability for "bodily injury",
"property damage" or "personal injury"; and
b. If, and only to the extent that, the injury or
damage is caused by acts or omissions of
you or your subcontractor in the performance
of your work" to which the 'written contract
requiring insurance" applies. The person or
organization does not qualify as an additional
insured with respect to the in • ;•=u nde nt acts
or omissions of such person or organization .
The insurance prov ided to such additional insured
is limited as follows:
c. In the event that the Limits of Insurance of
this Coverage Part shown in the Oeciaraitions
exceed the limits of liability required by the
'written contract requiring insurance, the in-
surance prov' to the additional insured
shall be ii m' to the limits of liability required
by that "written contract requiring insurance.
This endorsement shall not increase the k units
of insurance described in Section Ill — Limits
Of Insurance.
d. This insurance does not apply to the render-
ing of or failure to render any "professional
services" or construction management errors
or omissions.
e. This insurance does not apply to "bodily in-
jury" or "property damage" caused by "your
work" and included in the "products -
completed operations hazard" unless the
"written contract requiring insurance' specifi-
calty requires you to provide such coverage
for that itional insured, and then the insur-
ance provided to the additional in tired ap-
CG D4 14 c4 O
IT CAREFULLY.
ITTEN
NGINEERS AND
plies only to such "bodily injury" or "property
damage" that occurs before the end o f the pe-
riod of time for which the "written contract re-
quiring insurance" requires you to provide
such coverage or the end of the poi icy period,
whichever is earlier.
Z. The following is added to Paragraph 4.a, of SEC-
TION IV — COMMERCIAL GENERAL LIABILITY
CONDITIONS:
The insurance provided to the additional insured
is excess over any valid and collectible "other in-
surance", whether primary, excess, c 'ngent or
on any other basis, that is available to the add-
tional insured for a loss we cover. However. If you
specifically agree in the 'written contract requiring
insurance" that this insurance provided to the ad-
ditional insured under this Coverage Part must
apply on a primary basis or a primary and non-
contributory basis, this insurance is primary to
"other insurance" available to additional in-
sured which covers that person or • • tion as
a named insured for such loss, and we will not
share with that "other insurance. But this insur-
ance provided to the additional insured still is ex-
cess over any valid and collectible "other insur-
ance", whether primary, excess, contingent or on
any other basis. that is available to the additional
Insured when that person or organization is an
addition I insured under any "other insurance".
3. The following is a" + • to SECTION IV — COM-
MERCIAL GENERAL LIABILITY CONDITIONS:
Duties Of An ' itianarl Insured
As a condition of coverage provided to the addi-
tional insured:
a, The additional insured must give us written
notice as soon as practicable of an "occur-
rence" or an offense which may result in a
claim. To the extent possible, such notice
should include:
2©O8 The Travelers Companies. Inc.
COMMERCIAL GENERAL LIABILITY
i. How, when and where the "occurrence"
or offense took place ;
ii. The names and addresses of any injured
persons and witnesses; and
Iii. The nature and location of any injury or
damage arising out of the "occurrence or
offense.
b. If a claim is made or "suit" is brought against
the additional insured, the additional insured
must
i. Immediately record the specifics of the
claim or "suit' and the date received; and
ii. Notify us as soon as practicable.
The additional insured must see to it that we
receive written notice of the claim or "suit" as
soon as practicable.
c. The additional insured must immediately send
us copies of all legal papers received in con-
nection with the claim or "surf". cooperate with
us in the investigation or settlement of the
claim or defense against the "suit", and oth-
erwise comply with all policy condtions.
d. The additional insured must tender the de-
fense and indemnity of any claim or "suit" to
any provider of other insurance which would
cover the additional insured for a loss we
cover. However, this condition does not affect
whether this insurance provided to the addi-
tional insured is primary to that other insur-
ance available to the additional insured which
covers that person or organization as a
named insured.
4. The following is added to the DEFINITIONS Sec -
lion:
'Written contract requiring insurance" means that
part of any written contract or agreement under
which you are required to include a person or or-
ganization as an additional insured on this Cover-
age Part, provided that the "bodily injury" and
"property damage" occurs and the "personal in-
jury is caused by an offense committed;
a. After the signing and e xecution of the contract
or agreement by you;
b. While that part o f the contractor agreement is
in effect; and
c. Before the end of the policy period.
2008 The Travelers Companies, Inc.
CG 0414 04 08
COMMERCIAL GENERAL LIABILITY
THIS ENDORSEMENT CHANGES THE POLICY, PLEASE READ IT CAREFULLY.
XTEND ENDORSEMENT FOR ARCHITECTS, ENGINEERS
AND SURVEYORS
This endorsement modifies insurance provided under the following:
COMMERCIAL GENERAL UABIUTYCOVERAGE PART
GENERAL DESCRIPTION OF COVERAGE — This endorsement broadens coverage. However, coverage for any injury. damage or medical expenses described in any of the provisions of this endorsement may be excluded or limited by another endorsement to this Coverage Part, and these coverage broadening provisions do not apply to the extent that c overage is excluded or limited by such an endorsement. The fallowing listing is a general coverage description only. Read all the provisions of this endorsement and the rest of your policy carefully to determine rights, duties, and what is and is not covered.
A. Non -Owned Watercraft— 75 Feet Long Or Less
B. Who Is An Insured — Unnamed Subsidiaries
C. Who Is An insured — Retired Partners, Members,
Directors And Employees
D. Who Is An Insured — Employees And Volunteer
Workers — Bodily Injury To Co -Employees, Co -
Volunteer Workers And Retired Partners,
Members, Directors And Employees
E. Who Is An Insured — Newly Acquired Or Formed
Limited Liability Companies
F. Blanket Additional Insured — Controlling Interest
G. Blanket Additional Insured — Mortgagees.
Assignees, Successors Or Receivers
PROVISIONS
A. NON -OWNED WATERCRAFT — 75 FEET
LONG OR LESS
1. The following replaces Paragraph (2) of
Exclusion g., Aircroft, Auto Or Watercraft,
in Paragraph 2. of SECTION I -
COVERAGES - COVERAGE A - BODILY
INJURY AND PROPERTY DAMAGE
UABILITY:
(2) A watercraft you do not own that is:
(a) 75 feet long or less; and
(b) Not being used to carry any person
or property for a charge;
2. The following replaces Paragraph 2.e. of
SECTION II - WHO IS AN INSURED:
e. Any person or organization that with
your express or implied consent, either
CG D3 79 02 19
H.
I.
J.
K.
L
M.
N.
Blanket Additional Insured - Governmental
Entities - Permits Or Authorizations Relating To
Premises
Blanket Additional Insured - Governmental
Entities - Permits Or Authorizations Relating To
Operations
Incidental Medical Malpractice
Medical Payments - Increased Limit
Amendment Of Excess Insurance Condition -
Professional Liability
Blanket Waiver Of Subrogation — When Required
By Written Contract Or Agreement
Contractual Liability — Railroads
uses or is responsible for the use of a
watercraft that you do not own that is:
(1) 75 feet long or less; and
(2) Not being used to carry any person
or property for a charge;
B. WHO IS AN INSURED — UNNAMED
SUBSIDIAR
The following is added to SECTION H — WHO IS
AN INSURED:
Any of your subsidiaries, other than a partnership
or joint venture, that is not shown as a Named
Insured in the Declarations is a Named Insured
if:
a. You are the sole owner of, or maintain an
ownership Interest of more than 50% in, such
subsidiary on the first day of the policy
period; and
O 2017 The Travelers Indemnity Company. All rights reserved.
Includes copyrighted material of Insurance Services Office. Inc. with its permission.
COMMERCIAL GENERAL LIABILITY
b. Such subsidiary is not an insured under
similar other insurance.
No such subsidiary is an insured for "bodily
injury" or "property damage" that occurred, or
"personal and advertising injury" caused by an
offense committed:
a. Before you maintained an ownership interest
of more than 50% i n such subsidiary; or
b. After the date, if any, during the policy period
that you no longer maintain an ownership
interest of more than 50% in such subsidiary.
For purposes of Paragraph 1. of Section II - Who
Is An Insured, each such subsidiary will be
deemed to be designated in the Declarations as:
a. A limited Lability company;
b. An organization other than a partnership,
joint venture or limited liability company; or
c. A trust;
as indicated in its name or the documents that
govern its structure.
C. WHO IS AN INSURED - RETIRED PARTNERS,
MEMBERS, DIRECTORS AND EMPLOYEES
The following is added to Paragraph 2. of
SECTION II - WHO IS AN INSURED:
Any person who is your retired partner, member,
director or "employee' that is performing services
for you under your direct supervision, but only for
acts within the scope of their employment by you
or while arming duties related to the conduct
of your business, However, no such retired
partner, member, director or "employee" is an
insured for.
(1) "Bodily injury":
(a) To you, to your current partners or
members (if you are a partnership or
joint venture), to your current members
(if you are a limited liability company) or
to your current directors;
(b) To the spouse, child, parent, brother or
sister of that current partner, member or
director as a consequence of Paragraph
(1)(a) above;
(c) For which there is any obligation to
share damages with or repay someone
else who must pay damages because of
the injury described in Paragraph (1)(a)
or (b) above; or
(d) Arising out of his or her providing or
failing to provide professional health care
services.
Unless you are in the business or occupation
of providing professional health care'
services, Paragraphs (1)(a), (b), (c) and (d)
above do not apply to "bodily injury" arising
out of providing or failing to provide first aid
or "Good Samaritan services' by any of your
retired partners, members, directors or
'employees", other than a doctor. Any such
retired partners, members, directors or
"employees" providing or failing to provide
first aid or "Good Samaritan services" during
their work hours for you will be deemed to be
acting within the scope of their employment
by you or performing duties related to the
conduct of your business.
(2) "Personal injury":
(a) To you, to your current or retired
partners or members (if you are a
partnership or joint venture), to your
current or retired members (if you are a
limited liability company), to your other
current or retired directors or
"employees" while in the course of his or
her employment or performing duties
related to the conduct of your business.
or to your other 'volunteer workers"
while performing duties related to the
conduct of your business;
(b) To the spouse, child, parent, brother or
sister of that current or retired partner,
member, director. "employee" or
'volunteer worker" as a consequence of
Paragraph (2)(a) above:
(c) For which there Is any obligation to
share damages with or repay someone
else who must pay damages because of
the injury described in Paragraph (2Xa)
or (b) above; or
(d) Arising out of his or her providing or
failing to provide professional health care
services.
(3) "Property damage" to property:
(a) Owned. occupied or used by; or
(b) Rented to, in the care, custody or control
of, or over which physical control is
being exercised for any purpose by;
you, any of your retired partners, members
or directors, your current or retired
"employees" or "volunteer workers", any
current partner or member (if you are a
partnership or joint venture), or any current
member (if you are a limited liability
cornpany) or current director.
O 2017 The Travelers Indemnity Company. AI rights reserved.
Includes copyrighted material of Insurance Servkes Office, Inc. with its permission.
CG D3 79 02 19
COMMERCIAL GENERAL LIABILITY
D. WHO IS AN INSURED - E ': OYEES AND
VOLUNTEER WORKERS - BODILY INJURY
TO CO -EMPLOYEES. CO -VOLUNTEER
WORKERS AND RETIRED PAR
MEMBERS, DIRECTORS AND EMPLOYEES
The following is added to Paragraph 2.a.(1) of
SECTION II — WHO IS AN INSURED:
Paragraphs (1)(a), (b) and (c) above do not
apply to "bodily Injury" to a current or retired co -
"employee" while in the course of the co -
"employee's" employment by you or performing
duties rel to the conduct of your business, or
to "a".Ily injury" to your other "volunteer
workers" or retired partners, members or
directors while • - arming duties related to the
conduct of your business.
E. WHO IS AN INSURED — NEWLY ACQUIRED
OR FORMED LIMITED LIABILITY COMPANIES
The following replaces Paragraph 3. of
SECTION iI -- WHO IS AN INSURED:
3. Any organization you newly acquire or form,
other than a partnership or joint venture, and
of which you are the sole owner or in which
you maintain an ownership interest of more
than 50%, will qualify as a Named Insured if
there is no other similar insurance available
to that organization. However:
a. Coverage under this provision is
afforded only:
(1) Until the 180th day after you acquire
or form the organization or the end
of the policy period, whichever is
earlier, if you do not report such
organization in writing to us within
180 days after you acquire or form it;
or
(2) Until the end of the policy period.
when that dale is later than 180 da ys
after you acquire or form such
organization, If you report such
organization in writing to us within
1 BO days after you acquire or form it;
b. Coverage A does not apply to"
injury" or "property dam
occurred before you acquired or fo
the organization; and
c. Coverage B does not apply to "personal
and advertising injury" arising out of an
offense comm r r before you acquired
or foamed the organization,
For the purposes of Paragraph 1. of Section
II - Who Is An Insured, each such
CG D3 79 02 19
ly
at
organization will be deemed to be
designated in the Declarations as:
a. A &mited liability company:
b. An organization other than a partnership,
joint venture or limited liability company;
or
c. A trust:
as indicated in its name or the documents
that govern its structure.
F. BLANKET ADDITIONAL INSURED -
CONTROLLING INTEREST
1. The following is added to SECTION II —
WHO IS AN INSURED:
Any person or organization that has financial
control of you is an insured with respect to
&ability for "bodily injury". "property damage"
or "personal and advertising injury' that
arises out of:
a. Such financial control; or
b. Such person's or organization's
ownership, maintenance or use of
premises leased to or occupied by you.
The insurance provided to such person or
organization does not apply to struct rat
alterations. new construction or demolition
operations performed by or on behalf of such
person or organization.
2. The following is added to Paragraph 4. of
SECTION II — WHO IS AN INSURED:
This paragraph does not apply to any
premises owner, manager or lessor that has
financial control of you.
G. R LANKET ADDITIONAL INSURED
MORTGAGEES, ASSIGNEES, SUCCESS S
OR RECEIVERS
The following is added to SECTION Ii — WHO IS
AN INSURED:
Any person or organization that is a mortgagee,
assignee, successor or receiver and that you
have agreed in a written contract or agreement
to include as an additional insured on this
Coverage Part is an insured, but only with
respect to its liability as mortgagee, assignee,
successor or receiver for 'bodily injury", "property
damage" or "personal and advertising injury"
that:
a. Is "bodily injury" or "property damage" that
occurs, or is "personal and advertising injury"
caused by an offense that is committed,
m 2017 The Travelers Indemnty Company. AA rights reserved Includes copyrighted material of Insurance Services Moe, Inc. with its permission.
Page542of797
COMMERCIAL GENERAL LIABILITY
subsequent to the signing of that contract or
agreement and
b. Arises out of the ownership, maintenance or
use of the premises for which that
mortgagee. assignee, successor or receiver
is required under that contract or agreement
to be included as an additional insured on
this Coverage Part.
The insurance provided to such mortgagee,
assignee, successor or receiver is subject to the
following provisions:
a. The limits of Insurance provided to such
mo ee, assignee, successor or receiver
wig be the minimum limits that you agreed to
provide in the written contract or agreement,
or the limits shown in the Declarations,
whichever are less.
b. The insurance provided to such person or
organization does not apply to:
(1) Any "bodily injury" or "property damage"
that occurs, or any "personal and
advertising injury" caused by an offense
that is committed, after such contract or
agreement is no longer in effect; or
(2) Any "bodily injury", "property damage" or
"personal and advertising injury" arising
out of any structural alterations, new
construction or demolition operations
performed by or on behalf of such
mortgagee, assignee, successor or
receiver.
H. BLANKET ADDITIONAL INSURED —
GOVERNMENTAL ENTITIES — PERMITS OR
AUTHORIZATIONS RELATING TO PREMISES
The following is added to SECTION II — WHO IS
AN INSURED:
Any governmental entity that has issued a permit
or authorization with respect to premises owned
or occupied by, or rented or loaned to, you and
that you are required by any ordinance, law,
building code or written contract or agreement to
include as an additional insured on this
Coverage Part is an insured, but only with
respect to liability for "bodily injury", "property
damage" or "personal and advertising injury"
arising out of the existence, ownership. use.
maintenance, repair. construction, erection or
removal of any of the following for which that
governmental entity has issued such permit or
authorization; advertising signs, awnings.
canopies. cellar entrances, coal holes,
driveways, manholes, marquees, hoist away
openings, sidewalk vaults, elevators, street
banners or decorations,
I. BLANKET ADDITIONAL INSURED —
GOVERNMENTAL ENTITIES — PERMITS
OR AUTHORIZATIONS RELATING TO
OPERATIONS
The following is added to SECTION II - WHO IS
AN INSURED:
Any governmental entity that has issued a permit
or authorization with respect to operations
performed by you or on your behalf and that you
are required by any ordinance, law, building code
or written contract or agreement to include as an
additional insured on this Coverage Part is an
insured, but only with respect to liability for
"bodily injury'. "property damage" or "personal
and advertising injury" arising out of such
operations.
The insurance provided to such governmental
entity does not apply to:
a. Any "bodily injury". "property damage" or
"personal and advertising injury" arising out
of operations performed for the
governmental entity; or
b. Any "bodily injury" or "property damage"
included in the "products -completed
operations hazard".
J. INCIDENTAL MEDICAL MALPRACTICE
1. The following replaces Paragraph b. of the
definition of "occurrence" in the
DEFINITIONS Section:
b. An act or omission committed in
providing or failing to provide "incidental
medical services", first aid or 'Good
Samaritan services" to a person, unless
you are in the business or occupation of
providing professional health care
services.
2. The following replaces the last paragraph of
Paragraph 2.a.(1) of SECTION fl — WHO IS
AN INSURED:
Unless you are in the business or occupation
of providing professional health care
services, Paragraphs (1)(a), (b). (c) and (d)
above do not apply to "bodily injury" arising
out of providing or failing to provide:
(a) "Incidental medical services" by any of
your "employees" who is a nurse,
nurse assistant, emergency medical
technician, paramedic. athletic trainer,
audiologist dietician, nutritionist,
O 2017 The Travelers Indemnity Company_ All rights reserved.
Includes copyrighted material of Insurance Services Office. Inc_ with its permissi CG D3 79 02 19
COMMERCIAL GENERAL LIABILITY
occupational therapist or occupational
therapy assistant. physical therapist or
speech -language pathologist; or
(b) First aid or "Good Samaritan services"
by any of your "employees" or "volunteer
workers", other than an employed or
volunteer doctor. Any such "employees"
or "volunteer workers" providing or failing
to provide first aid or "Good Samaritan
services" during their work hours for you
will be deemed to be acting within the
scope of their employment by you or
performing duties related to the conduct
of your business.
3. The following replaces the last sentence of
Paragraph 5. of SECTION III — UMITS OF
INSURANCE:
For the purposes of determining the
applicable Each Occurrence Limit, all related
acts or omissions committed in providing or
failing to provide "incidental medical
services", first aid or "Good Samaritan
services" to any one person will be deemed
to be one "occurrence".
4. The following exclusion is added to
Paragraph 2., Exclusions, of SECTION I —
COVERAGES — COVERAGE A — BODILY
INJURY AND PROPERTY DAMAGE
LIABILITY:
Sale Of Pharmaceuticals
'Bodily injury' or "property damage" arising
out of the violation of a penal statute or
ordinance relating to the sale of
pharmaceuticals committed by, or with the
knowledge or consent of the insured.
5. The following is added to the DEFINITIONS
Section:
"Incidental medical services" means:
a. Medical, surgical, dental. laboratory, x-
ray or nursing service or treatment,
advice or instruction, or the related
furnishing of food or beverages; or
b. The furnishing or dispensing of drugs or
medical, dental, or surgical supplies or
appliances.
6. The following is added to Paragraph 4.b..
Excess Insurance. of SECTION IV —
COMMERCIAL GENERAL UABIUTY
CONDITIONS:
This insurance is excess over any valid and
collectible other insurance, whether primary,
excess, contingent or on any other basis,
CG D3 79 0219
that is available to any of your "employees"
for "bodily injury" that arises out of providing
or falling to provide incidental medical
services' to any person to the extent not
subject to Paragraph 2.a.(1) of Section II —
Who Is An Insured.
K. MEDICAL PAYMENTS— IN D LIMIT
The following replaces Paragraph 7. of
SECTION III — UMITS OF INSURANCE:
7. Subject to Paragraph 5. above. the Medical
Expense Limit is the most we will pay under
Coverage C for all medical expenses
because of "bodily injury' sustained by any
one person. and will be the higher of:
a. $10.000; or
b. The amount shown in the Declarations of
this Coverage Part for Medical Expense
Limit.
L. AMENDMENT OF EXCESS INSURANCE
CONDITION — PROFESSIONAL LIABILITY
The following is added to Paragraph 4.b.,
Excess Insurance, of SECTION IV —
COMMERCIAL GENERAL LIABILITY
CONDITIONS:
This insurance is excess over any of the other
insurance, whether primary, excess, contingent
or on any other basis. that is Professional
Liability or similar coverage. to the extent the
loss is not subject to the professional services
exclusion of Coverage A or Coverage B.
M. BLANKET WAIVER OF SUBROGATION —
WHEN REQUIRED BY WRITTEN CONTRACT
OR AG T
The following is added to Paragraph 8., Transfer
Of Rights Of Recovery Against Others To Us,
of SECTION IV — COMMERCIAL GENERAL
UABILITY CONDITIONS:
If the insured has agreed In a written contract or
agreement to waive that insured's right of
recovery against any person or organization, we
waive our right of recovery against such person
or organization, but only for payments we make
because of:
a. 'Bodily injury" or 'property damage" that
occurs; or
b. "Personal and advertising injury' caused by
an offense that is committed;
subsequent to the signing of that contract or
agreement
02017 The Travelers Indemnity Company. MI rights reserved. Page 5 of 6 Includes copyrighted material of Insurance Services Office, Inc. with i*s permission.
Page544of797
COMMERCIAL GENERAL LIABILITY
N. CONTRACTUAL LIABILITY — RAILROADS
1. The following replaces Paragraph c. of the
definition of "insured contract" in the
DEFINITIONS Section:
c. Any easement or license agreement:
2. Paragraph f.(1) of the definition of "insured
contract' in the DEFINITIONS Section is
deleted.
O 2017 The Travelers indemnify Company. M rV& reserved. CG D3 79 02 19 Includes copyrighted material of Insurance Services Office. Inc. v th Its permission.
0RR
HARTFORD CT 06183
WORKERS C NSATFON
AND
EMPLOYERS POLICY
EVENT WC 000313(00)- 001
POLICY NUMBER: 08-61317115-23-43-a
WAIVER OF OUR RIGHT TO RECOVER FROM OTHERS ENDORSEMENT
We have the right to recover our payments from anyone liable for an injury covered by this policy. We will not enforce our right against the person or organization named in the Schedule. (;his t applies only to the extent that you perform work under a written contract that requires you to obtain this agreement from us.) This agreement shall not operate directly or indirectly to benefit any one not named in the Schedule.
DESIGNATED PE
TED ORGANIZATION:
OR ORGANIZATION FOR MITCH THE I
CT ERYC0TED PRIOR TO LASS
ktry
BY WR1
SCH
HAS AORZED
SR THIS
Any person or organization for which the : 1 er has agreed by written contract, executed prior to loss, may execute a waiver of subrogation. However, for purposes of work performed by the foyer in Missouri, this waiver of subrogation doss not apply to any construction group of classifications as designated by the waiver of right to recover from others (subrogation) rule in our manual.
DATE OF ISSUE: 08-31-23 ST ASSIGN:
PAGE 1 OF 1
Page546of797
V
Front
To:
Cc:
Subject
Andrew Tse
Monday, December 18, 2023 9:33 AM
Veronica Sanchez
Bernardo Iniguez
RE COI - Bowman Infrastructure Engineers
HI Veronica,
That is fine. Please include a copy of this a i!
Andy
From: Veronica Sanchez
Sent: Monday, December 18, 2023 9:29 AM
To: Andrew Tse
Cc: Bernardo Iniguez
Sub RE: COI - Bowman Infrastructure Engineers
c
to as evidence as such. Thanks.
Good Morning «y,
Hope you had a nice weekend) This was the explanation we received on the requested changes to the COI from Bowman Infrastructure Engineers.
Below is the explanation from our insurance broker, please let me know if this will satisfy the request from the City:
1, Your GL policy has what is called a blanket additional insured endorsement. That means as long as you have a contract that requires you to have the City of Bell Gardens as an additional insured, then they are considered an additional insured.
2. Your Auto forms are caned `Virginia Business Auto Coverage Extension Endorsement" because Bowman is out of Virginia. This is just a naming convention of Travelers and has no factor on the cove :: , This does not excl California in any way
Please confirm If this is acceptable.
Thank you,
Veronica
From: Andrew Tse
Sent Wednesday, December 13, 2023 10:58 AM
To: Veronica Sanchez
Cc: Bernardo Iniguez
Subject: RE: COI - Bowman Infrastructure Engineers
HI Veronica,
Could they please name City of Bell Gardens as additionally insured on the insurance endorsement? Also, the auto addendum is for the State of Virginia. Could they please obtain a California addendum from their carrier? Thanks.
From: Veronica Sanchez
Cc: Bernardo inlguez glpittaggrsts
Subject COI - Bowman Infrastructure Engineers
HI Again,
Can you confirm that this COI for Bowman Infrastructure E I Is ctory7 The Fourth Amendment to the Professional Services
Thank you,
Veronica Sanchez
City of Bell Gardens
Department of Public Works
8327 Garfield Avenue
Bell Gardens, CA 90201
562-806-7770
2 ed rence
Page549of797
EXHIBIT "B"
JANUARY 2025 SUPPLEMENTAL PROPOSAL
5
January 23, 2025
Bernie Iniguez
Director Public Works
City of Bell Gardens
8327 Garfield Avenue
Bell Gardens, CA 90201
RE: Request for Contract Cost Increase - Amendment No. t Dear Mr. Iniguez:
Bowman requests a contract cost amendment due to the quantity of projects undertaking by the contract and workload. The original contract, not to exceed amount of $1,500,000 will be exceeded as the current workload is designed, constructed and completed.
In discussions with the City, it has been determined to the mutual benefit of the City and Bowman that the contract not to exceed amount be increased for the remainder of the current year of the contract. The new not to exceed contract amount is to be $2,500,000.
If I can be of any tsistance, please contact me directly at my cell phone 714-458-8470 to address any questions
Sincerely,
Farzad Dorrani, MS
Principal of Operations
3060 Saturn Street, Suite 250, Brea, California 92821
714.940.0100
bowman.com
ACORD
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.
IMPORTANT: If the certificateholderis an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed.
If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).
CERTIFICATE OF LIABILITY INSURANCE
DATE (MMIDD/TYYY)
08/30/2024
PRODUCER
Klein Agency, LLC
P.O. Box 219
Timonium
INSURED
Bowman Infrastructure Engineers LTD
3060 Saturn Street
Suite 250
Brea
COVERAGES
MD 21094
CA 92821
CONTACT Certificates
NAME:
PHONE (410) 832-7600
JIV", fee, EMI"
E-MAIL [email protected]
ADDRESS:
INSURER(S) AFFORDING COVERAGE
INSURER A Charter Oak Fire Insurance Co
INSURER B : Travelers Indemnity Co. of Am
INSURER C : Travelers Property Casualty Co. of America
INSURER o : Berkshire Hathaway Specialty Insurance
INSURER E: Beazley insurance Company
FAX () 410 832.1849
(ANC, Noi:
INSURER F:
CERTIFICATE NUMBER: 24-25 Infrastructure
REVISION NUMBER:
NAIC *
25615
25666
25674
22276
37540
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES, LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
INSF
LTR
PE OF INSURANCE
ENERAL LIA
X
OCCUR
---7rtf€JLSt1ATi POLICY EFF POLICY EXP
IwSd WVD POLICY NUMBER (MMIDDIYYYYI - (MMIDO/YYYN
A X Contractual Liability
GEN'L AGGREGATE LIMIT APPLIES PER:
POLICY X PRO-
JECT
THER:
LOC
6J047645-COF-24
AUTOMOBILE LIABI
X ANY AUTO
- OWNED
AUTOS ONLY
HIRED
AUTOS ONLY
SCHEDULED
AUTOS
NON -OWNED
AUTOS ONLY
810-87020319-24-43
08/31/2024 08131/2025
UMBRELLA LIAB
EXCESS LIAR
X
OCCUR
C
E
DED
RETENTIOt
CUP -6,1395074-24-23
WORKERS COMPENSATION
AND EMPLOYERS' LIABILITY
ANY PROPRIETORrPARTNERJEXECUTIVE
C OFFICER/MEMBER EXCLUDED?
(Mandatory In NH)
If yes, describe under
DESCRIPTION OF OPERATIONS Delcx
YIN
N
A
B -6J317115 -24-43-G
Primary Professional & Pollution Liab
DIE Excess Professional & Pollution Liab
LIMITS
EACH OCCURRENC
DAMAGE r0
PREMISES II
1,000.000
ce
,000,0
ED ESP iA
000
PERSONAL & ADV INJURY
000.000
GENERAL AGGREGATE
2,000,000
2,000,000
PRODUCTS- COMPIOP AG
08/31/2024 08/31/2025
OMBINED SINGLE LIMIT
Ea aceidentl
DOILY INJURY (Per person',
,000,00
BODILY INJURY (Per accident)
PROPERTY DAMAGE
/Per aceidne l
08/31/2024 08131/202
EACH OCCURRENCE
25,000,00
AGGREGATE
25,000,000
08/31/2024 08/31/202
47EPP33066602N3349C240301
08/31/2024 08/31/2025
X
PER
STATUTE
R
.L. EACH ACCIDENT
1,000,000
L DISEASE - EA EMPLOYEE
,000,0
E DISEASE - POLICY UMIT
Each Claim/Aggregate $5,000,000
Excess Each Claim/Aggr. $5,000,000
,000
DESCRIPTION OF OPERATIONS 1 LOCATIONS 1 VEHICLES (ACORD 101, Addidonal Remarks Schedule, may be attached If mare space Is required) RE: All operations for the City of Bell Gardens. Endorsements CGD414, CGF475, CAF227, OAF 29, WC000313 are attached. If required by an insured written contract, executed prior to any loss, The City of Bell Gardens is an Additional Insured on a primary and non-contributory basis under the General and Auto Liability Policies. If required by an insured written contract, executed prior to any loss, Waiver of Subrogation is provided for General, Auto, and Workers Compensation Policies. Umbrella Policy follows form over General, Auto, and Employer's Liability Policies. 30 day notice of cancellation, 10 day for non-payment.
CERTIFICATE HOLDER CANCELLATION
City of Bell Gardens
8327 Garfield Avenue
ATTN: City Clerk
Bell Gardens
CA 90201
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE
THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN
ACCORDANCE WITH THE POLICY PROVISIONS,
AUTHORIZED REPRESENTATIVE
O 1988-2015 ACORD CORPORATION. All rights reserved.
ACORD 25 (2016103) The ACORD name and logo are registered marks of ACORD
Page554of797
EXHIBIT "B"
CPI REQUEST LETTER
5
April 1, 2025
INFRASTRUCTURE
Mr. Michael O'Kelly
City Manager
City of Bell Gardens
7100 Garfield Avenue
Bell Gardens, CA 90201
RE: Consultant Professional Services Agreement for Ongoing As -Needed Municipal Engineering Services — RATE INCREASE
Dear Mr. O'Kelly:
This letter serves as a courtesy notification that effective July 1, 2025, the hourly rates and retainer fees will increase by 5% as per our contract agreement with the City which commenced on March 1, 2024.
We are very appreciative of the continued opportunity to service the needs of Bell Gardens and look forward to a long and rewarding relationship with the City.
Thank you and if you wish to discuss this matter further, please contact me at (714) 940-0100, Extension 5032.
Respectfully,
Farzad Dorrani, MS
Principal and Branch Manager
FD/om
3060 Saturn Street, Suite 250, Brea, California 9282_1
P: 714.940.0100
infrastructure-enayineers.com i bowman.com
EXHIBIT "B"
MARCH 2026 SUPPLEMENTAL SCOPE OF WORK
5
REQUEST FOR SERVICES
City of Bell Gardens
TO: Bernardo Iniguez, Director of Public Works/Facilities DATE: March 5, 2026
FROM: Aidan Mousavi, PE, TE, QSD, Principal of Design Services SUBJECT: Bell Gardens Water System Appraisal Report
Acct. No.:
Type of Project: ®Public Works ❑ Community Development ❑Traffic ❑ Park and Rec.
Description of Request: Based on the City's request, Bowman proposes to provide services to retain a subconsultant to complete a Bell Gardens Water System appraisal report. Staff reached out to Willdan, Bucknam and Associates, and Raftelis to provide appraisal services. Raftelis is the only firm that has provided a proposal.
Scope of Services:
The sco
De of services includes the followinc Tasks:
1. Preparation of the Bell Gardens Water System appraisal report.
2. Project Manacement and Administration
Staff to review and discuss results of appraisal with City staff includinc the followinc:
1. Attend a pre-desicn (kick-off meetinc
with City representatives to review the project
in detail, to determine the City's specific recuirements.
2. Maintain continuous communication with the City Pro
meetincs to review project status.
3. Monitor progress of design team to ensure
budcet.
4. Provide project updates.
5. Maintain continuous awareness of the status of each task as it ect Manager, including
project delivery on schedule and within
proceeds and make
provisions to ex
pedite and resolve any difficulties that may impede procress.
Bowman's fee for above services will be accordinc to the City's acreement as indicated below:
Task
Preliminary Engineering Phase
Cost
1 Preparation of the Bell Gardens Water System appraisal report. $44,333
2 Project Manacement and Administration
$ 8,940
TOTAL
$53,273
This RFS is for the above tasks of the project only and does not include any other tasks related to the project, which are not listed herewith. A separate RFS shall be prepared for any additional Q:\CA-BREA-IS\Business development\ I O_Business Development \RFSs\Bell Gardens\2026 RFS \BG-2026-RFSO4-City Water System Appraisal Report \BG-2026- RFSO4-City Water System Appraisal Report-03-05-26.docx
REQUEST FOR SERVICES
tasks.
To be completed by Bowman:
Project Number:
Projected Date of Completion:
Project Manager:
Estimated Cost of Services:
Two (2) months after RFS Approval
Charlie Marr, PE
$53,273
03/05/2026
E QSD, Principal of
Desig
n Mousavi, TE, Q
Q:\CA-BREA-IS\Business development\ I O_Business Development \RFSs\Bell Gardens\2026 RFS \BG-2026-RFSO4-City Water System Appraisal Report \BG-2026- RFSO4-City Water System Appraisal Report-03-05-26.docx
CITY OF BELL GARDENS
OFFICE OF THE CITY MANAGER
EXECUTIVE SUMMARY
TO: Honorable Mayor and City Council Members
FROM: Michael B. O'Kelly, City Manager
BY: Bernardo Iniguez, Director of Public Works/Facilities SUBJECT: Consideration of a Resolution Approving a Seventh Amendment to Professional Services Agreement with RJM Design Group, Inc. to Provide Additional Construction Administration Services for the John Anson Ford Park Playground and Restroom Improvements
DATE: March 9, 2026
RECOMMENDATION:
It is staff's recommendation that the City Council adopt the attached Resolution authorizing the City Manager to execute a Seventh Amendment to the Professional Services Agreement with RJM Design Group, Inc.
BACKGROUND/DISCUSSION:
On February 24, 2021, the City entered into a Professional Services Agreement with RJM Design Group, Inc. (RJM) for design, architecture, and engineering services for the John Anson Ford Park Regional Aquatics Center Improvements (the "Aquatics Center") in the amount of $1,037,625. On October 25, 2021, the City Council approved the collective First Amendment, adding design and engineering services in the amount of $444,850, for design of new HVAC at the Ford Park gym/auditorium; field investigation of an existing underground storage tank; new park walkway lighting; and potential yard relocation and new playground equipment and restroom building, for a total increased contract cost of $1,482,475.
On June 13, 2022, the City Council approved a Second Amendment, adding design services in the amount of $63,300, to modify the plans by separating the Ford Park east playground and restroom building renovation from the Aquatics Center, for a total increased contract cost of $1,545,775; and adding a $25,000 contingency for additional services. On May 1, 2024, the City Manager approved a Third Amendment under his sigining authority provided in Section 6.4 of the Master Agreement, for additional environmental support services in the amount of $23,186, which were necessary for the proper removal of hazardous materials from the Aquatics Center construction site, for a total increased contract cost of $1,568,961.
On December 9, 2024, the City Council approved a Fourth Amendment, adding design and environmental support services in the amount of $87,876, to make necessary design modifications for the Aquatics Center lobby entry doors and entry/exit gates, prepare bulletin plans, prepare as -built drawings at project completion, and provide additional environmental consulting services that were needed for the removal of Polychlorinated
biphenyl and asbestos -containing material, for a total increased contract cost of $1,656,837.
On March 24, 2025, the City Council approved a Fifth Amendment, adding design services to make necessary architectural and electrical changes to the Computer Server/IT Room in the amount of $7,418, and added another $25,000 for contingency should there be any additional design services needed for the duration of the Aquatics Center construction, at the discretion of the City Manager, for a total Compensation of $1,689,255. Of the approved contingency, only $5,750 was used, therefore the total agreement compensation increased to $1,670,005.
On August 11, 2025, the City Council approved a Sixth Amendment, adding construction administration services to review Aquatics Center submittals, review Aquatics Center requests for information, attend construction progress meetings, and coordinate with the contractor on revisions to the Aquatics Center design. A remaining amount of $23,000 in reimbursable allowances was relocated to the construction administration services and an additional amount of $51,750 was appropriated for an additional amount of $74,750 for construction administration services necessary to complete the Aquatics Center, increasing the total agreement compensation to $1,721,755.
The Aquatics Center has now been completed and RJM's services will now be needed for Construction Administration and Observation for the Ford Park Playground and Restroom Improvements Project, which RJM designed as part of the First Amendment.
The Ford Park Playground and Restrooms Improvements Project is currently out to bid for construction.
On February 5, 2026, RJM provided a proposal for Construction Administration and Observation for the Ford Park Playground and Restroom Improvements Project, for an amount of $29,750. Public Works staff reviewed the proposal and found it to be satisfactory.
CONCLUSION:
Approving a Seventh Amendment to the Professional Services Agreement would enable RJM to provide Construction Administration and Observation for the Ford Park Playground and Restroom Improvements Project now that the Aquatics Center has been completed.
FISCAL IMPACT:
The proposal amount is $29,750 which would increase the compensation to a not -to - exceed sum of $1,751,505. A .03% contingency in the amount of $5,250 would be added to cover unforeseen or additional costs for a potential total amount of $1,756,755. An appropriation of $35,000 in General Funds is needed for the proposed Seventh Amendment.
APPROVALS:
Michael B. O'Kelly, City Manager
Stephanie Vasquez, City Attorney
Manuel Carrillo, Director of Finance and Administrative Services
RESOLUTION NO. 2026-29
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF BELL
GARDENS, CALIFORNIA, APPROVING A SEVENTH AMENDMENT
TO THE PROFESSIONAL SERVICES AGREEMENT BY AND
BETWEEN THE CITY OF BELL GARDENS AND RJM DESIGN
GROUP, INC. FOR ADDITIONAL CONSTRUCTION ADMINISTRATION
SERVICES FOR THE JOHN ANSON FORD PARK PLAYGROUND
AND RESTROOM IMPROVEMENTS
WHEREAS, on February 24, 2021, the City of BeII Gardens ("City") and RJM Design Group, Inc. ("RJM") executed and entered into the Professional Services Agreement for RJM to provide professional design, architecture and engineering services for the John Anson Ford Park Regional Aquatics Center Improvements (hereinafter "Master Agreement"); and
WHEREAS, the Master Agreement was later amended by way of the First Amendment, Second Amendment, Third Amendment, Fourth Amendment, Fifth Amendment and Sixth Amendment (collectively referred to as the "Amendments") which were approved by the City Council or the City Manager pursuant to the authority provided in the Master Agreement; and
WHEREAS, the City now desires to amend the existing Master Agreement to modify the scope of services, increase the compensation and revise the completion date.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of BeII Gardens as follows:
SECTION 1. The City Council, after consideration of the staff report and discussion, hereby finds that the above recitals are true and correct and incorporate them herein.
SECTION 2. Based upon the above recitals, the staff report accompanying this Resolution, and such other oral and written evidence, the BeII Gardens City Council hereby approves a Seventh Amendment to the Master Agreement with RJM Design Group, Inc., which is attached to the staff report as Exhibit 2.
SECTION 3. The City Council further authorizes and directs the City Manager to execute the Seventh Amendment and take all actions necessary to appropriate, implement and effectuate the intent of the City Council as set forth in this Resolution.
SECTION 4. The City Clerk shall attest and certify to the passage and adoption of this Resolution and enter it into the book of original resolutions, and it shall become effective immediately upon its approval.
[Signatures on the following page]