DocuSign Envelope ID: 6301F9C4-70E9-42D0-85FE-9419387EDFDC C.4.f
Packet Pg. 257 Attachment: BSK Associates Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey Agreements) Photo Description:

Figure 2. A top view photo of Column 720
with a diameter measurement of
approximately 42 inches.

The work  Was  inspected in accordance with approved documents The work inspected/tested Met the requirements of the approved documents.

Material sampling was performed in accordance with the regulatory agency approved documents.

Technician: Kou Yang
Soils Daily Field Report Report #: 001­B­000012
Livermore
399 Lindbergh Avenue
Livermore, CA 94551
Phone: 925­315­3151
Fax: 925­315­3152
Client:

City of Brentwood
150 City Park Way
Brentwood, CA 94513
Project:

C2027561L (337114)
Brentwood WWTP Expansion Phase II
2101 Elkins Way
Brentwood, CA 94513
The results relate only to the items inspected or tested.

The report shall not be reproduced, except in full, without the prior written approval of BSK.

Page 2 of 3 ends

Signature:

Kou Yang
10/22/2020

Page 2 of 5 ends

DocuSign Envelope ID: 6301F9C4-70E9-42D0-85FE-9419387EDFDC C.4.f
Packet Pg. 258 Attachment: BSK Associates Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey Agreements) Report Summary
Type of Inspection / Service: Soil­Cement Coring
Date: 12/15/2020
I arrived on site as requested by Casey Kirk, PSOMAS construction manager, to observe the coring in previously placed soilcement at Area 15. Boring was conducted by Keller and logged by Lindsay Shapiro and Blair Rushing, Keller's engineer.

Keller used a Soilmec SM­10 micro drilling rig with 3 inch diameter drilling rods to drill a total of 2 locations at Cell 15­6.

Drilling operation lasted approximately 2 hours to reach the final depth. Two coring operation was conducted at Cell 15­6.

Boring 15­6A and 15­6B was drilled to a depth of 10 feet and 24 feet below grade surface (bgs), respectively.  Two borings were conducted because 15­6A was located near to the side of the cell.  The offset to the new location 15­6B, placed the rig closer to the center of the cell.  Observed core recovery from each run ranged from mid 93 to 100 percentile. Rock quality designation (RQD) ranged from a low of 83 to 99 percent. Note, core recovery and RQD was calculated by Keller. The final boring depth at Area 15, boring 15­6B was approximately 23 to 24 feet bgs.

At approximately 20 feet bgs at Area 15, Cell 15­6B, a layer of clayey sand was observed. Keller crew continued drilling pass this depth and ended the operation at approximately 23 to 24 feet bgs. Soil in the lower depth, as observed from the core sample, was a well­graded sand layer that was approximately 16 to 18 inch thick, followed by a 12 to 14 inch layer of clay.  All cores were stored in cardboard boxes.

A total of 3 samples were collected from the boring site at various depths. Samples were collected from 2.5 feet bgs, 10 feet bgs, and 15 feet bgs. All samples were transported to BSK Livermore Lab for storage and curing.

Photos
Photo Description:

Figure 1. Drilling operation in the early
morning at Area 15, Cell 15­6.

Soils Daily Field Report Report #: 001­B­000062
Livermore
399 Lindbergh Avenue
Livermore, CA 94551
Phone: 925­315­3151
Fax: 925­315­3152
Client:

City of Brentwood
150 City Park Way
Brentwood, CA 94513
Project:

C2027561L (337114)
Brentwood WWTP Expansion Phase II
2201 Elkins Way
Brentwood, CA 94513
The results relate only to the items inspected or tested.

The report shall not be reproduced, except in full, without the prior written approval of BSK.

Page 1 of 6 ends

DocuSign Envelope ID: 6301F9C4-70E9-42D0-85FE-9419387EDFDC C.4.f
Packet Pg. 259 Attachment: BSK Associates Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey Agreements) Photo Description:

Figure 2. A photo depiction of the drill rig
coring 15­6B. Boring 15­6A can be seen
in front of Boring 15­6B
Photo Description:

Figure 3. Coring samples placed in a
cardboard box.

Soils Daily Field Report Report #: 001­B­000062
Livermore
399 Lindbergh Avenue
Livermore, CA 94551
Phone: 925­315­3151
Fax: 925­315­3152
Client:

City of Brentwood
150 City Park Way
Brentwood, CA 94513
Project:

C2027561L (337114)
Brentwood WWTP Expansion Phase II
2201 Elkins Way
Brentwood, CA 94513
The results relate only to the items inspected or tested.

The report shall not be reproduced, except in full, without the prior written approval of BSK.

Page 2 of 6 ends

DocuSign Envelope ID: 6301F9C4-70E9-42D0-85FE-9419387EDFDC C.4.f
Packet Pg. 260 Attachment: BSK Associates Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey Agreements) Photo Description:

Figure 4. A photo depiction of the change
of soil type from sand to clay layer. Finger
print indentation can be observed in the
sand layer.

The work  Was  inspected in accordance with City or County approved documents The work inspected/tested Met the requirements of the City or County approved documents.

Material sampling was performed in accordance with the regulatory agency approved documents.

Technician: Kou Yang
Soils Daily Field Report Report #: 001­B­000062
Livermore
399 Lindbergh Avenue
Livermore, CA 94551
Phone: 925­315­3151
Fax: 925­315­3152
Client:

City of Brentwood
150 City Park Way
Brentwood, CA 94513
Project:

C2027561L (337114)
Brentwood WWTP Expansion Phase II
2201 Elkins Way
Brentwood, CA 94513
The results relate only to the items inspected or tested.

The report shall not be reproduced, except in full, without the prior written approval of BSK.

Page 3 of 6 ends

DocuSign Envelope ID: 6301F9C4-70E9-42D0-85FE-9419387EDFDC C.4.f
Packet Pg. 261 Attachment: BSK Associates Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey Agreements) The work  Was  inspected in accordance with City or County approved documents The work inspected/tested Met the requirements of the City or County approved documents.

Material sampling was performed in accordance with the regulatory agency approved documents.

Technician: Kou Yang
Report Summary
Type of Inspection / Service: Soil
Date: 12/15/2020
I arrived on site as requested by Casey Kirk, PSOMAS construction manager, to perform compaction tests at Aeration Basin 3 and 4.  Grading and compaction was performed by AMStephen Construction, using a vibrating smooth drum roller for compaction effort and a blade for grading.  Aggregate base rock (AB) was placed as a shallow lift, apparently 6 inches in total thickness.  AMStephen’s crew compacted the area throughout the day.  A total of 10 field density compaction tests were conducted with results meeting the minimum compaction of 95 percent.

Photos
Photo Description:

Figure 1. A sitemap depicting
approximate location of performed
compaction tests.

Photo Description:

Figure 2. Grading and compaction in the
early morning.

Soils Daily Field Report Report #: 001­B­000062
Livermore
399 Lindbergh Avenue
Livermore, CA 94551
Phone: 925­315­3151
Fax: 925­315­3152
Client:

City of Brentwood
150 City Park Way
Brentwood, CA 94513
Project:

C2027561L (337114)
Brentwood WWTP Expansion Phase II
2201 Elkins Way
Brentwood, CA 94513
The results relate only to the items inspected or tested.

The report shall not be reproduced, except in full, without the prior written approval of BSK.

Page 4 of 6 ends

DocuSign Envelope ID: 6301F9C4-70E9-42D0-85FE-9419387EDFDC C.4.f
Packet Pg. 262 Attachment: BSK Associates Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey Agreements) Photo Description:

Figure 3. AMStephen’s operator
compacting the placed AB toward the end
of the day.

The work  Was  inspected in accordance with City or County approved documents The work inspected/tested Met the requirements of the City or County approved documents.

Material sampling was performed in accordance with the regulatory agency approved documents.

Technician: Kou Yang
Soils Daily Field Report Report #: 001­B­000062
Livermore
399 Lindbergh Avenue
Livermore, CA 94551
Phone: 925­315­3151
Fax: 925­315­3152
Client:

City of Brentwood
150 City Park Way
Brentwood, CA 94513
Project:

C2027561L (337114)
Brentwood WWTP Expansion Phase II
2201 Elkins Way
Brentwood, CA 94513
The results relate only to the items inspected or tested.

The report shall not be reproduced, except in full, without the prior written approval of BSK.

Page 5 of 6 ends

Signature:

Kou Yang
12/17/2020

Page 5 of 7 ends

DocuSign Envelope ID: 6301F9C4-70E9-42D0-85FE-9419387EDFDC C.4.f
Packet Pg. 263 Attachment: BSK Associates Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey Agreements) Test Information
Test # Test Location Elevation Reference
Gauge
Make / Model / SN / Calibrated Field Technician
40 Structural Fill: Building Pad: Aeration Basin 3 and 4 CPN / MC-3 / M36046720 / 4/13/2020 Kou Yang 41 Structural Fill: Building Pad: Aeration Basin 3 and 4 CPN / MC-3 / M36046720 / 4/13/2020 Kou Yang 42 Structural Fill: Building Pad: Aeration Basin 3 and 4 CPN / MC-3 / M36046720 / 4/13/2020 Kou Yang 43 Structural Fill: Building Pad: Aeration Basin 3 and 4 CPN / MC-3 / M36046720 / 4/13/2020 Kou Yang 44 Structural Fill: Building Pad: Aeration Basin 3 and 4 CPN / MC-3 / M36046720 / 4/13/2020 Kou Yang 45 Structural Fill: Building Pad: Aeration Basin 3 and 4 CPN / MC-3 / M36046720 / 4/13/2020 Kou Yang 46 Structural Fill: Building Pad: Aeration Basin 3 and 4 CPN / MC-3 / M36046720 / 4/13/2020 Kou Yang 47 Structural Fill: Building Pad: Aeration Basin 3 and 4 CPN / MC-3 / M36046720 / 4/13/2020 Kou Yang Remarks
DP/MP: Density Pass / Moisture Pass
Comments
Tests are "Direct Transmission" (Method A) unless probe depth is noted as "Backscatter". Gauge calibration data on file with the testing agency.

Test Results
Test #
Retest
Of Test Date Proctor ID Method
Soil
Classification
Optimum
Moisture
(%)
Maximum
Dry
Density (pcf)

In Place
Moisture
(%)
In Place
Dry
Density
(pcf)
In Place
Wet
Density
(pcf)
Probe
Depth
(in)
Percent
Compaction
Min/Max
Comp.
(%) Remark
40 12/15/20 12710 C AB 5.4 140.8 6.4 135.5 144.2 4 96 95 / 100 DP/MP 41 12/15/20 12710 C AB 5.4 140.8 6.1 133.5 141.6 4 95 95 / 100 DP/MP 42 12/15/20 12710 C AB 5.4 140.8 6.2 136.0 144.4 4 97 95 / 100 DP/MP 43 12/15/20 12710 C AB 5.4 140.8 6.4 134.8 143.4 4 96 95 / 100 DP/MP 44 12/15/20 12710 C AB 5.4 140.8 6.5 133.1 141.7 4 95 95 / 100 DP/MP 45 12/15/20 12710 C AB 5.4 140.8 6.5 134.8 143.6 4 96 95 / 100 DP/MP 46 12/15/20 12710 C AB 5.4 140.8 6.5 133.5 142.2 4 95 95 / 100 DP/MP 47 12/15/20 12710 C AB 5.4 140.8 6.6 135.6 144.5 4 96 95 / 100 DP/MP

Page 1 of 2 ends

Soil Nuclear Gauge
Test Method: ASTM D 6938
Report Date: 12/17/2020
Report #: SNG-000012
Client:

City of Brentwood
Brentwood, CA 94513
150 City Park Way
Project:

Brentwood WWTP Expansion Phase II
C2027561L (337114)
Brentwood, CA 94513
2201 Elkins Way
399 Lindbergh Avenue
Livermore, CA 94551
Phone: 925-315-3151 | Fax: 925-315-3152
Livermore

Page 6 of 7 ends

DocuSign Envelope ID: 6301F9C4-70E9-42D0-85FE-9419387EDFDC C.4.f
Packet Pg. 264 Attachment: BSK Associates Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Test Information
Test # Test Location Elevation Reference
Gauge
Make / Model / SN / Calibrated Field Technician
48 Structural Fill: Building Pad: Aeration Basin 3 and 4 CPN / MC-3 / M36046720 / 4/13/2020 Kou Yang 49 Structural Fill: Building Pad: Aeration Basin 3 and 4 CPN / MC-3 / M36046720 / 4/13/2020 Kou Yang Remarks
DP/MP: Density Pass / Moisture Pass
Comments
Tests are "Direct Transmission" (Method A) unless probe depth is noted as "Backscatter". Gauge calibration data on file with the testing agency.

Test Results
Test #
Retest
Of Test Date Proctor ID Method
Soil
Classification
Optimum
Moisture
(%)
Maximum
Dry
Density (pcf)

In Place
Moisture
(%)
In Place
Dry
Density
(pcf)
In Place
Wet
Density
(pcf)
Probe
Depth
(in)
Percent
Compaction
Min/Max
Comp.
(%) Remark
48 12/15/20 12710 C AB 5.4 140.8 6.2 137.2 145.7 4 97 95 / 100 DP/MP 49 12/15/20 12710 C AB 5.4 140.8 6.8 135.4 144.6 4 96 95 / 100 DP/MP

Page 2 of 2 ends

Soil Nuclear Gauge
Test Method: ASTM D 6938
Report Date: 12/17/2020
Report #: SNG-000012
Client:

City of Brentwood
Brentwood, CA 94513
150 City Park Way
Project:

Brentwood WWTP Expansion Phase II
C2027561L (337114)
Brentwood, CA 94513
2201 Elkins Way
399 Lindbergh Avenue
Livermore, CA 94551
Phone: 925-315-3151 | Fax: 925-315-3152
Livermore

Page 7 of 7 ends

DocuSign Envelope ID: 6301F9C4-70E9-42D0-85FE-9419387EDFDC C.4.f
Packet Pg. 265 Attachment: BSK Associates Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, General Information
Date: 02/04/2022
Work Performed: Concrete Sampling
Inspection/Testing Data
Frequency: Periodic
Location / Area: Brentwood WWTP Expansion Phase ll, 2101 Elkins Way, Brentwood city Narrative:

I arrived on site at 5:30 AM and met with PSOMAS construction manager (Kelly Smith) and  R&W representative.

R& W placed amount of 36 cubic yards of concrete at the job site, 9 cubic yards for the inner wall (half of the wall) of the secondary clarifier No.3 and 27 cubic yards for the roof (see photos for the locations detail). The concrete was placing using Boom Pump and consolidated mechanically.

Concrete Information
Mix Number: 6840913E4
Tests Performed:

Slump Test / Temperature Test / Prepared 4X8 Compression Samples / Air Content Test (Pressure Meter)
Total Yards (yds ): 36.00 3
Concrete Activity Report Report #: 013­000053
JA
Livermore
399 Lindbergh Avenue
Livermore, CA 94551
Phone: 925­315­3151
Client:

City of Brentwood
150 City Park Way
Brentwood, CA 94513
Project:

C2027561L (337114)
Brentwood WWTP Expansion Phase II
2101 Elkins Way
Brentwood, CA 94513

Page 1 of 3 ends

DocuSign Envelope ID: 6301F9C4-70E9-42D0-85FE-9419387EDFDC C.4.f
Packet Pg. 266 Attachment: BSK Associates Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey Agreements) Narrative:

I arrived on site at 5:30 AM and met with PSOMAS construction manager (Kelly Smith) and  R&W representative.

R& W placed amount of 36 cubic yards of concrete at the job site, 9 cubic yards for the inner wall (half of the wall) of the secondary clarifier No.3 and 27 cubic yards for the roof (see photos for the locations detail). The concrete was placing using Boom Pump and consolidated mechanically.

Concrete Information
Mix Number: 6840913E4
Tests Performed:

Slump Test / Temperature Test / Prepared 4X8 Compression Samples / Air Content Test (Pressure Meter)
Total Yards (yds ): 36.00
Photos
Description of Photo:

Concrete placement location (half of the inner wall and the roof attached to the clarifier)
Description of Photo: Concrete ticket
The work Was Inspected/tested in accordance with Approved Documents The work Met  the requirements of Approved Plans and Specifications.

Inspector/ Technician: Mohammed Al­Behadili
Certification Number: Al­Behadili, Mohammed ­ ACI Concrete Field Technician ­ 01644876 3 Concrete Activity Report Report #: 013­000053
JA
Livermore
399 Lindbergh Avenue
Livermore, CA 94551
Phone: 925­315­3151
Client:

City of Brentwood
150 City Park Way
Brentwood, CA 94513
Project:

C2027561L (337114)
Brentwood WWTP Expansion Phase II
2101 Elkins Way
Brentwood, CA 94513

Page 2 of 3 ends

DocuSign Envelope ID: 6301F9C4-70E9-42D0-85FE-9419387EDFDC C.4.f
Packet Pg. 267 Attachment: BSK Associates Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey Agreements) Work Performed: High strength bolting Activity Date: 02/15/2022 Inspection Per: Structural Drawings
Location: Onsite Erector / Fabricator: Killcorn Construction High Strength Bolting
Inspection Performed: Pretension Testing Frequency: Periodic Bolt Types: A325N Connection Type: Non­Slip Critical Method of Tightening:

Snug Tight (Spud Wrench)
Verified tension with skidmore: Yes
Summary:

On­site for Skidmore testing and discuss means and methods of tightening with contactor (Killcorn Construction) Performed Skidmore testing on three (3) 1" diameter A325 bolts.   Bolts supplied are from same lot.

Skidmore testing is by means of "Snug Tight" methods with acceptable results.

Frame connections, beams to columns and peak.   Eight (8) A325 bolts each connections. line 1, 2, 3, 3.9, 5, 6, 7 and 8 between line A and B, complete with visually acceptable results plies in contact and bolts tight.

Portal Frames, beam to columns.  Eight (8) bolts each connection.

Line A and B at 2 to 3 and 5 to 6, complete with visually acceptable results plies in contact and bolts tight.

Strut connections, strut to columns.  Two (2) 1" diameter A325 bolts each end of strut.

Line A at 3 and 3.9, complete with visually acceptable results plies in contact and bolts tight.

Tension Values
Bolt Type: A325N Coating: Black Bolt Diameter: 1 Bolt Length: 3 Value (Kips): 19 Bolt Type: A325N Coating: Black Bolt Diameter: 1 Bolt Length: 3 Value (Kips): 21 Bolt Type: A325N Coating: Black Bolt Diameter: 1 Bolt Length: 3 Value (Kips): 20 The work was inspected/tested in accordance with City or County approved documents The work met the requirements of the City or County approved documents Inspector/Technician: Dennis Ness
Bolting Certification: Ness, Dennis ­ ICC ­ Structural Steel ­ Bolting ­ 1085332 Structural Steel Report Report #: 014­000003
JA
Livermore
399 Lindbergh Avenue
Livermore, CA 94551
Phone: 925­315­3151
Client:

City of Brentwood
150 City Park Way
Brentwood, CA 94513
Project:

C2027561L (337114)
Brentwood WWTP Expansion Phase II
2101 Elkins Way
Brentwood, CA 94513

Page 1 of 2 ends

DocuSign Envelope ID: 6301F9C4-70E9-42D0-85FE-9419387EDFDC C.4.f
Packet Pg. 268 Attachment: BSK Associates Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey Agreements) ASTM D1557
Laboratory Data
Method: C (ASTM D1557)
Preparation Method: Moist
Rammer Type: Mechanical Pie­Shaped
Specific Gravity: 2.81
Maximum Dry Density (pcf): 143.0
Optimum Moisture (%): 6.6
Soil Classification: AB Aggregate Base, Grey
General
Test Notes: Agg Base
Test Completed By: David Ordaz Test Completed Date: 10/21/2020 Approved By: Randy Cortez Approved Date: 10/22/2020
Moisture­Density Relationship
Agg
Report #: MDRA­000001
Livermore
399 Lindbergh Avenue
Livermore, CA 94551
Phone: 925­315­3151
Fax: 925­315­3152
Client:

City of Brentwood
150 City Park Way
Brentwood, CA 94513
Project:

C2027561L (337114)
Brentwood WWTP Expansion Phase II
2101 Elkins Way
Brentwood, CA 94513
The results relate only to the items inspected or tested.

The report shall not be reproduced, except in full, without the prior written approval of BSK.

Page 1 of 2 ends

DocuSign Envelope ID: 6301F9C4-70E9-42D0-85FE-9419387EDFDC C.4.f
Packet Pg. 269 Attachment: BSK Associates Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey Agreements) Specimen
Number
Test
Age Days
Test
Date
Field / Lab
Cure Days
Average Cylinder
Diameter (in)
Cylinder
Area (in²)
Max Load
(lbs)
Strength
(psi)
Fracture
Type
Break
Remark
Capping
Method
18-1 28 12/29/20 13 / 15 3.20 8.04 3,730 460 2 N
18-2 28 12/29/20 13 / 15 3.20 8.04 3,890 480 3 N
18-3 28 12/29/20 13 / 15 3.20 8.04 3,570 440 3 N
18-4 28 12/29/20 13 / 15 3.20 8.04 3,710 460 3 N
Test Age Average Strengths (psi): 28 Day - 460
Tested By: Ireneo Bueno (1,2,3,4)
Checked In : 12/14/2020 (1,2,3,4)
Capping Methods
N: Unbonded Caps (ASTM C1231)
Set #: 18
Specimen Size: Concrete Core
Specimens In Set: 4
Truck / Ticket #:

Contractor:

Technician: Keller
Cast By: Keller
Date Cast: 12/01/20
Sampled From: Other
Placement Method:

Sample Details
Batched:

Sampled: 12:00 PST
Cast: 12:13 PST
Truck Empty:

Placement Time:

Placement Location: Not Specified
Location Details: Area 51 (Cell 51-3)
Sample Location / Notes: Cell 51-3
Batch Log
Strength: 180 (psi)
Specifications
On-Site Admixtures: None
Location
Field Measurements
Plastic Unit Weight:

Air Content:

Load Volume:

Weather: Consistency: Slump
Air Temperature (F): Concrete Temp (F):

Lab Test Results
General Remarks
18-1: Cell 51-3 at 2 feet bgs, 18-2: Cell 51-3 @ 6 feet bgs, 18-3: Cell 51-3 at 12 feet bgs, 18-4: Cell 51-3 at 16 feet bgs The results relate only to the items inspected or tested.

The report shall not be reproduced, except in full, without the prior written approval of BSK.

Page 1 of 1 ends

Client:

City of Brentwood
Brentwood, CA 94513
150 City Park Way
Project:

Brentwood WWTP Expansion Phase II
C2027561L (337114)
Brentwood, CA 94513
2201 Elkins Way
Compressive Strength of Soil-Cement
Test Method: ASTM D 1633 Sample: 12843
Report #: CC-000028
Livermore
399 Lindbergh Avenue
Livermore, CA 94551
Phone: 925-315-3151
Fax: 925-315-3152
Report Date: 12/30/2020
DocuSign Envelope ID: 6301F9C4-70E9-42D0-85FE-9419387EDFDC C.4.f
Packet Pg. 270 Attachment: BSK Associates Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey Agreements) Statement of Qualifications BSK Proposal No. CL22-22812 Geotechnical/Construction Materials Testing Services March 8, 2022 Brentwood, California

APPENDIX C

STRUCTURAL TESTS & INSPECTION SCHEDULE
DocuSign Envelope ID: 6301F9C4-70E9-42D0-85FE-9419387EDFDC C.4.f
Packet Pg. 271 Attachment: BSK Associates Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey Agreements)

SPECIAL INSPECTION &

TESTING AGREEMENT
Neighborhood
Services
Effective:

Revised: May 7, 2018
150 City Park Wy, Brentwood, CA 94513 (925) 516-5405 Voice (925) 516-5407 Fax

STRUCTURAL TESTS & INSPECTIONS SCHEDULE
REINFORCING STEEL:
__ Tensile & Bond
__ Inspection of Placement
__ Inspection of Welding
STRUCTURAL STEEL:
__ Sample & Test
__ Shop Indent. & Welding Inspection
__ Shop Ultrasonic Inspection
__ Shop Radiography
__ Field Welding Inspection
__ Field Bolting
__ Field Ultrasonic Inspection
__ Field Radiography
__ Metal Deck Welding Inspection
MASONRY:
__ Preliminary Acceptance Tests (masonry units, wall prisms) __ Subsequent Tests (mortar, grout, field wall prisms)
__ Inspection of Grouting
__ Inspection of Placement & Grouting
Conc ShotͲ
crete
Grout Mortar
Agg. Tests for Designs
Suitability of Agg.
Mix Designs
Test Panel
Batch Plant Insp.

Cement Grab Sample
Inspect Placing
Compression Tests
Cast Specimens
PickͲup Samples
Shrinkage Bars
Yield Check
Air Check
Dry Unit Weight
PILING, CAISSONS, CAPS, TIES:
__ Inspection of Reinforcing Placement
__ Inspection of Concrete Placement
__ Inspection of Concrete Batching
STRUCTURAL HARDWARE:
__ Holdown Installation
__ Tiedown System Installation
__ Epoxied Anchors & Bolts
INSULATING CONCRETE:
__ Sample & Tests
__ Unit Weights
FIREPROOFING:
__ Inspection of Placement
__ Density Tests
__ Thickness Tests
__ Inspect Batching
GEOTECHNICAL: (Inspections & Testing by Geotechnical Engineer) __ Fill Material Acceptance Tests
__ MoistureͲDensity Determination
__ Field Density/Compaction
__ Pier Drilling
__ Observation & Testing by Soils Engineer
UNDERPINNING:
__ Inspection of Steel Fabrication
__ Inspection of Reinforcing & Forms
__ Inspection of Concrete Placement
__ Inspection of Tiebacks
ROOFING & WATERPROOFING:
__ Inspection of Placement
__ Sample & Test
__ Basement Waterproofing
CONCRETE, GUNITE, GROUT & MORTAR:
PRECAST CONCRETE:
__ Reinforcement Tests
__ Inspection of Reinforcing Placement
__ Tendon Tests
__ Inspection of Tendon Placement
__ Inspection of Concrete Placement
__ Inspection of Concrete Batching
__ Inspection of Panel Attach & Inserts
__ Inspection of Panel Installation
__ Compression Tests
__ Inspection of Stressing/Transfer
STRUCTURAL WOOD:
__ Inspection of Fabrication
__ Inspection of Truss Joist Fab.
__ Sample & Test Components
__ Inspection of GluͲlam Fab.
__ Shearwall Construction & Nailing
OTHER TESTS OR INSPECTIONS:
____________________________________________________
____________________________________________________
____________________________________________________
$PNQMFUFUIJTQBHFPOMZBOESFUVSOXJUITVCNJUUBM
x
x x x x
x x x
x x x x
x
x x x x
x x x x
x x x x
x x x x
x x x x
x x x x
x x x x
x x x x
x x x x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
Post-installed anchors/dowels x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
DocuSign Envelope ID: 6301F9C4-70E9-42D0-85FE-9419387EDFDC C.4.f
Packet Pg. 272 Attachment: BSK Associates Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey Agreements) Statement of Qualifications BSK Proposal No. CL22-22812 Geotechnical/Construction Materials Testing Services March 8, 2022 Brentwood, California

APPENDIX D

SCHEDULE OF FEES
DocuSign Envelope ID: 6301F9C4-70E9-42D0-85FE-9419387EDFDC C.4.f
Packet Pg. 273 Attachment: BSK Associates Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey Agreements) DocuSign Envelope ID: 6301F9C4-70E9-42D0-85FE-9419387EDFDC C.4.f
Packet Pg. 274 Attachment: BSK Associates Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey Agreements) DocuSign Envelope ID: 6301F9C4-70E9-42D0-85FE-9419387EDFDC C.4.f
Packet Pg. 275 Attachment: BSK Associates Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey Agreements) 1 PSA_City Attorney Approved Version 040821

AGREEMENT FOR ON-CALL GEOTECHNICAL/CONSTRUCTION MATERIALS TESTING SERVICES Construction Testing Services, Inc.

THIS AGREEMENT is made and entered into as of the _____ day of __________________, 2022 by and between the City of Brentwood, a municipal corporation of the State of California ("City"), and Construction Testing Services, Inc., a C Corporation ("Consultant") (each a “Party” and collectively, the “Parties”).

RECITALS
A. City requires the professional services of a consultant specifically trained and experienced in geotechnical/construction materials testing services, which are professional services outside of services offered by City.

B. Consultant has the professional skills and experience necessary to perform the services described in this Agreement.

C. Consultant customarily engages in these services as part of its independently established trade, occupation, and/or business, separately from its work for City.

D. City desires to engage Consultant to provide these services by reason of its qualifications and experience in performing such services
E. Consultant has submitted a proposal to City and has affirmed its willingness and ability to perform such work on the terms and manner set forth in this Agreement.

NOW, THEREFORE, in consideration of these recitals and the mutual covenants contained herein, the Parties agree as follows:

1. Scope of Work.

1.1 City retains Consultant, as an independent contractor, to perform, and Consultant agrees to render, those services (the "Services") that are described in the attached Exhibit "A," which is incorporated by this reference, pursuant to this Agreement’s terms and conditions.

1.2 Consultant will control the manner and the means of the work to be performed, and be responsible for the professional quality, technical accuracy and coordination of the Services. Consultant will, without additional compensation, correct or revise any errors or deficiencies in the Services.

1.3. Consultant will keep City informed on a regular basis that the Services are being performed in accordance with the requirement and intentions of this Agreement.

1.4 If applicable, Consultant has designated those persons listed in Exhibit “A” to provide the Services to the City. Consultant will not change or reassign those persons described in Exhibit “A” without prior written notice to City, and will not replace those individuals with individuals to whom City has a reasonable objection.

2. Standard of Performance. Consultant acknowledges that in entering into this Agreement the City is relying on Consultant's special skills and experience to do and perform the Services. While performing the Services, Consultant will exercise the reasonable professional care and skill customarily exercised by reputable members of Consultant's profession practicing in the Northern California area. The acceptance of the Services by City does not release Consultant from these obligations.

Consultant will be responsible for employing or engaging all persons necessary to perform the Services.

Consultant will control the manner and means of the services to be performed by its employees and subconsultants. All of Consultant's staff will be qualified by training and experience to perform their DocuSign Envelope ID: FCFC00B2-D385-476C-B135-220A5E783022 C.4.g
Packet Pg. 276 Attachment: Construction Testing Services, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey 2 PSA_City Attorney Approved Version 040821
assigned tasks. Consultant will give its personal attention to the fulfillment of the provisions of this Agreement by all of its employees and subcontractors, if any, and will keep the Services under its control.

On demand of City, if any employee or subcontractor of Consultant fails or refuses to carry out the provisions of this Agreement or appears to be incompetent or to act in a disorderly or improper manner, he or she will be discharged immediately from the Services.

3. Term. Unless earlier terminated, the term of this Agreement will be effective for a period of one year from the date first above written. The City Manager may amend the Agreement to extend it for two additional one-year periods or parts thereof in an amount not to exceed one hundred thousand dollars ($100,000) per Agreement year. Extensions will be based upon a satisfactory review of Consultant's performance, City needs, and appropriation of funds by the City Council. The parties will prepare a written amendment indicating the effective date and length of the extended Agreement.

4. Schedule. Consultant will generally adhere to the schedule set forth in Exhibit “A” provided, that City will grant reasonable extensions of time for the performance of the Services occasioned by unusually lengthy governmental reviews of Consultant’s work product or other unavoidable delays occasioned by unforeseen circumstances; provided, further, that such unavoidable delay will not include strikes, lockouts, work stoppages, or other labor disturbances conducted by, or on behalf of, Consultant’s officers or employees.

Consultant acknowledges the importance to City of City’s project schedule and agrees to put forth its best professional efforts to perform the Services in a manner consistent with that schedule. City understands, however, that Consultant’s performance must be governed by sound practices. Consultant will work such overtime or engage such personnel and equipment as necessary to maintain the schedule, without additional compensation.

5. Compensation.

5.1 The total fee payable for the Services to be performed during the term of this Agreement will be a not to exceed amount of one hundred thousand dollars ($100,000) as may be further specified in the attached Exhibit “A.” No other compensation for the Services will be allowed except for items covered by subsequent amendments to this Agreement. The City reserves the right to withhold a ten percent (10%) retention until City has accepted the Services.

5.2 Payment will occur only after receipt by City of invoices sufficiently detailed to include hours performed, hourly rates, and related activities and costs for approval by City.

5.3 Within thirty (30) days after receipt of any applicable progress payment request, City will verify the accuracy of the request, correct the charges where appropriate, and make payment to Consultant in an amount equal to the amount of such application, as verified or corrected by City. No payment made prior to completion and acceptance of the Services will constitute acceptance of any part of the Services.

City reserves the right to withhold payment from Consultant on account of Services not performed satisfactorily, delays in Consultant's performance of Services, or other defaults hereunder.

6. Status of Consultant. Consultant will perform the Services as an independent contractor, free from the control and direction of City, in pursuit of Consultant’s independent calling, and not as an employee of City. The persons used by Consultant to provide the Services under this Agreement will not be considered employees of City for any purposes whatsoever and City will not pay any tax, workers’ compensation insurance, retirement contributions or unemployment contributions on behalf of Consultant or its employees or subcontractors. Consultant agrees to indemnify and pay City within thirty (30) days for any tax, retirement contribution, social security, overtime payment, unemployment payment or workers’ compensation payment, including, but not limited to, those based on any provision of the Federal Affordable Care Act, which City may be required to make on behalf of Consultant or any agent, employee, or contractor of Consultant for work done under this Agreement. The payment made to Consultant pursuant to the Agreement will be the full and complete compensation to which Consultant is entitled. City will not make any federal or state tax withholdings on behalf of Consultant or its agents, employees or subcontractors.

DocuSign Envelope ID: FCFC00B2-D385-476C-B135-220A5E783022 C.4.g
Packet Pg. 277 Attachment: Construction Testing Services, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey 3 PSA_City Attorney Approved Version 040821
At the City’s election, City may deduct the amounts paid pursuant to this Section, from any balance owing to Consultant.

7. Subcontracting. Consultant's services are being requested by City because they are unique and personal. Except as may be specified in Exhibit “A”, Consultant will not subcontract any portion of the Services without prior written approval of City Manager or his/her designee. If Consultant subcontracts any of the Services, Consultant will be fully responsible to City for the acts, errors and omissions of Consultant's subcontractor and of the persons either directly or indirectly employed by the subcontractor, as Consultant is for the acts and omissions of persons directly employed by Consultant. Nothing contained in this Agreement will create any contractual relationship between any subcontractor of Consultant and City.

Consultant will be responsible for payment of subcontractors. Consultant will bind every subcontractor and every subcontractor of a subcontractor by the terms of this Agreement applicable to Consultant's work unless specifically noted to the contrary in the subcontract and approved in writing by City.

8. Other Consultants. The City reserves the right to employ other consultants in connection with the Services.

9. Indemnification. Consultant agrees to indemnify, including the cost to defend, City, its officers, agents, volunteers and employees from any and all claims, demands, costs or liability that arise out of, or pertain to, or relate to the negligence, recklessness, or willful misconduct of Consultant and its agents in the performance of services under this Agreement, but this indemnity does not apply to liability for damages for death or bodily injury to persons, injury to property, or other loss, arising from the sole negligence, willful misconduct or defects in design by City or the agents, servants, or independent contractors who are directly responsible to City, or arising from the active negligence of City.

10. Insurance. Consultant will obtain and maintain, at its cost and expense, for the duration of the Agreement and any and all amendments, insurance against claims for injuries to persons or damage to property which may arise out of or in connection with performance of the Services by Consultant or Consultant’s agents, representatives, employees or subcontractors. The insurance will be obtained from an insurance carrier admitted and authorized to do business in the State of California. The insurance carrier is required to have a current Best's Key Rating of not less than "A:VII."

10.1 Coverages and Limits. Consultant will maintain the types of coverages and minimum limits indicated below, unless Risk Manager or City Manager, in consultation with the City Attorney approves a lower amount. These minimum amounts of coverage will not constitute any limitations or cap on Consultant's indemnification obligations under this Agreement. City, its officers, agents, volunteers and employees make no representation that the limits of the insurance specified to be carried by Consultant pursuant to this Agreement are adequate to protect Consultant. The coverage will contain no special limitations on the scope of its protection to the above-designated insureds except for Workers Compensation and errors and omissions insurance. Consultant will obtain occurrence coverage, excluding Professional Liability, which will be written as claims-made coverage. If Consultant believes that any required insurance coverage is inadequate, Consultant will obtain such additional insurance coverage, as Consultant deems adequate, at Consultant's sole expense.

10.1.1 Commercial General Liability Insurance. $2,000,000 combined single-limit per occurrence for bodily injury, personal injury and property damage. If the submitted policies contain aggregate limits, general aggregate limits will apply separately to the work under this Agreement or the general aggregate will be twice the required per occurrence limit.

10.1.2 Automobile Liability. $1,000,000 combined single-limit per accident for bodily injury and property damage.

10.1.3 Workers' Compensation and Employer's Liability. Workers' Compensation limits as required by the California Labor Code and Employer's Liability limits of $1,000,000 per accident for bodily injury. Workers' Compensation and Employer's Liability insurance will not be required if Consultant has no employees and provides, to City's satisfaction, a declaration stating this.

DocuSign Envelope ID: FCFC00B2-D385-476C-B135-220A5E783022 C.4.g
Packet Pg. 278 Attachment: Construction Testing Services, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey 4 PSA_City Attorney Approved Version 040821

10.1.4 Professional Liability. Errors and omissions liability appropriate to Consultant’s profession with limits of not less than $1,000,000 per claim.

10.2 Endorsements. For Commercial General Liability Insurance, Consultant will ensure that the policies are endorsed to name the City, its officers, agents, volunteers and employees as additional insureds. Prior to City's execution of this Agreement, Consultant will furnish, to the satisfaction of the City, certificates of insurance and endorsements.

10.3 Cancellation. Insurance will be in force during the life of the Agreement and any extensions of it and will not be canceled without thirty (30) days prior written notice to City sent pursuant to the notice provisions of this Agreement.

10.4 Failure to Maintain Coverage. If Consultant fails to maintain any of these insurance coverages, then City will have the option to declare Consultant in breach of this Agreement, or may purchase replacement insurance or pay the premiums that are due on existing policies in order to maintain the required coverages. Consultant is responsible for any payments made by City to obtain or maintain insurance and City may collect these payments from Consultant or deduct the amount paid from any sums due Consultant under this Agreement.

10.5 Submission of Insurance Policies. City reserves the right to require, at any time, complete and certified copies of any or all required insurance policies and endorsements.

10.6 Primary Coverage. For any claims related to the Services and this Agreement, the Consultant’s insurance coverage will be primary insurance with respect to City, its officers, agents, volunteers and employees. Any insurance or self-insurance maintained by City for itself, its officers, agents, volunteers and employees, will be in excess of Consultant’s insurance and not contributory with it.

10.7 Reduction in Coverage/Material Changes. Consultant will notify City in writing pursuant to the notice provisions of this Agreement thirty (30) days prior to any reduction in any of the insurance coverage required pursuant to this Agreement or any material changes to the respective insurance policies.

10.8 Waiver of Subrogation. The policies shall contain a waiver of subrogation for the benefit of City.

11. Business License. Consultant will obtain and maintain a City of Brentwood Business License for the term of the Agreement, as it may be amended from time-to-time.

12. Maintenance of Records. Consultant will maintain complete and accurate records with respect to costs incurred under this Agreement. All records will be clearly identifiable. Consultant will allow a representative of City during normal business hours to examine, audit, and make transcripts or copies of records and any other documents created pursuant to this Agreement. Consultant will allow inspection of all work, data, documents, proceedings, and activities related to the Agreement for a period of three (3) years from the date of final payment under this Agreement.

13. Ownership of Documents.

13.1 All product produced by Consultant or its agents, employees, and subcontractors pursuant to this Agreement (the “Work Product”) is the property of City. In the event this Agreement is terminated, all Work Product produced by Consultant or its agents, employees and subcontractors pursuant to this Agreement will be delivered to City pursuant to the termination clause of this Agreement. Consultant will have the right to make one (1) copy of the Work Product for Consultant’s records.

13.2 The Work Product may be used by City and its agents, employees, representatives, and assigns, in whole or in part, or in modified form, for all purposes City may deem advisable, without further employment of or payment of any compensation to Consultant; provided, however, that if this Agreement DocuSign Envelope ID: FCFC00B2-D385-476C-B135-220A5E783022 C.4.g
Packet Pg. 279 Attachment: Construction Testing Services, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey 5 PSA_City Attorney Approved Version 040821
is terminated for any reason prior to completion of the Project and if under such circumstances City uses, or engages the services of and directs another consultant to use, the Work Product, City agrees to hold Consultant harmless from any and all liability, costs, and expenses relative to claims arising out of matters and/or events which occur subsequent to the termination of this Agreement as a result of causes other than the fault or negligence of Consultant, or anyone for whose acts it is responsible, in preparation of the Work Product. Consultant will not be responsible for deficiencies solely attributable to modifications of the Work Product performed by others, or that arise from use of the Documents in connection with a project or site other than that shown in the Work Product.

14. Copyrights. Consultant agrees that all copyrights that arise from the Services will be vested in City and Consultant relinquishes all claims to the copyrights in favor of City.

15. Confidentiality. All documents, reports, information, data, and exhibits prepared or assembled by Consultant in connection with the performance of the Services pursuant to the Agreement are confidential until released by the City to the public, and the Consultant will not make any of these documents or information available to any individual or organization not employed by the Consultant or the City without the written consent of the City before any such release.

16. Notices. Any notices relating to this Agreement shall be given in writing and shall be deemed sufficiently given and served for all purposes when delivered personally, by facsimile or by generally recognized overnight courier service, or five (5) days after deposit in the United States mail, certified or registered, return receipt requested, with postage prepaid, addressed as follows:

For City:

City of Brentwood
150 City Park Way
Brentwood, CA 94513
Phone No. (925) 516-5307
Attn: Jigar Shah
For Consultant:

Name: Construction Testing Services, Inc.

Title: President
Address: 2118 Rheem Drive
Pleasanton, CA 94588
Phone: (925) 462-5151
Attn: Patrick Greenan
Either Party may change its address for purposes of this section by giving the other Party written notice of the new address in the manner set forth above.

17. Conflicts of Interest.

17.1 City will evaluate Consultant’s duties pursuant to this Agreement to determine whether disclosure under the Political Reform Act and City’s Conflict of Interest Code is required of Consultant or any of Consultant’s employees, agents, or subcontractors. Should it be determined that disclosure is required, Consultant or Consultant’s affected employees, agents, or subcontractors will complete and file with the City Clerk those schedules specified by City and contained in the Statement of Economic Interests Form 700.

17.2 Consultant understands that its professional responsibility is solely to City. Consultant warrants that it presently has no interest, present or contemplated, and will not acquire any direct or indirect interest, that would conflict with its performance of this Agreement. Consultant further warrants that neither Consultant, nor Consultant’s agents, employees, subcontractors and consultants have any ancillary real property, business interests or income that will be affected by this Agreement or, alternatively, that Consultant will file with the City an affidavit disclosing this interest. Consultant will not knowingly, and will take reasonable steps to ensure that it does not, employ a person having such an interest in the performance of this Agreement. If after employment of a person, Consultant discovers that it has employed a person with a direct or indirect interest that would conflict with its performance of this Agreement, Consultant will promptly disclose the relationship to the City and take such action as the City may direct to remedy the conflict.

DocuSign Envelope ID: FCFC00B2-D385-476C-B135-220A5E783022 C.4.g
Packet Pg. 280 Attachment: Construction Testing Services, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey 6 PSA_City Attorney Approved Version 040821

18. General Compliance with Laws. Consultant will keep fully informed of federal, state and local laws and ordinances and regulations which in any manner affect those employed by Consultant, or in any way affect the performance of the Services by Consultant. Consultant will at all times observe and comply with these laws, ordinances, and regulations and will be responsible for the compliance of the Services with all applicable laws, ordinances and regulations.

19. Pandemic Health Laws. Consultant’s duty to comply with Laws includes compliance by Consultant with all local, state, or federal Laws that have been or may be enacted in response to the COVID-19 pandemic (collectively, “Health Laws”), which include all of the County of Contra Costa Health Orders. Failure to fully comply with the Health Laws constitutes a material default, subject to all available remedies including suspension or termination.

20. Discrimination and Harassment Prohibited. Consultant will comply with all applicable local, state and federal laws and regulations prohibiting discrimination and harassment.

21. Termination. In the event of the Consultant's failure to prosecute, deliver, or perform the Services, City may terminate this Agreement for nonperformance by notifying Consultant in writing pursuant to the notice provisions of this Agreement. Consultant has five (5) business days to deliver any documents owned by City and all work in progress to City address contained in this Agreement. City will make a determination of fact based upon the work product delivered to City and of the percentage of work that Consultant has performed which is usable and of worth to City in having the Agreement completed. Based upon that finding City will determine the final payment of the Agreement. In the event City elects to terminate, City will have the right to immediate possession of all Work Product and work in progress prepared by Consultant, whether located at the project site, at Consultant's place of business, or at the offices of a subconsultant.

Either Party, upon tendering thirty (30) calendar days written notice to the other Party, may terminate this Agreement for convenience. In this event and upon request of City, Consultant will assemble the work product without charge and put it in order for proper filing and closing and deliver it to City. Consultant will be paid for work performed to the termination date; however, the total will not exceed the lump sum fee payable under this Agreement. City will make the final determination as to the portions of tasks completed and the compensation to be made.

22. Covenants Against Contingent Fees. Consultant warrants that Consultant has not employed or retained any company or person, other than a bona fide employee working for Consultant, to solicit or secure this Agreement, and that Consultant has not paid or agreed to pay any company or person, other than a bona fide employee, any fee, commission, percentage, brokerage fee, gift, or any other consideration contingent upon, or resulting from, the award or making of this Agreement. For breach or violation of this warranty, City will have the right to terminate this Agreement for nonperformance, or, in its discretion, to deduct from the Agreement price or consideration, or otherwise recover, the full amount of the fee, commission, percentage, brokerage fees, gift, or contingent fee.

23. Claims And Lawsuits. By signing this Agreement, Consultant agrees that any Agreement claim submitted to City must be asserted as part of the Agreement process as set forth in this Agreement and not in anticipation of litigation or in conjunction with litigation. Consultant acknowledges that if a false claim is submitted to City by Consultant, it may be considered fraud and Consultant may be subject to criminal prosecution. Consultant acknowledges that California Government Code sections 12650 et seq., the False Claims Act, applies to this Agreement and, provides for civil penalties where a person knowingly submits a false claim to a public entity. These provisions include false claims made with deliberate ignorance of the false information or in reckless disregard of the truth or falsity of information. If City seeks to recover penalties pursuant to the False Claims Act, it is entitled to recover its litigation costs, including attorney's fees. Consultant acknowledges that the filing of a false claim may subject Consultant to an administrative debarment proceeding as the result of which Consultant may be prevented to act as a Consultant on any public work or improvement for a period of up to five (5) years. Consultant acknowledges debarment by another jurisdiction is grounds for City to terminate this Agreement.

DocuSign Envelope ID: FCFC00B2-D385-476C-B135-220A5E783022 C.4.g
Packet Pg. 281 Attachment: Construction Testing Services, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey 7 PSA_City Attorney Approved Version 040821

24. Jurisdiction, Venue and Governing Law. Any action at law or in equity brought by either of the Parties for the purpose of enforcing a right or rights provided for by this Agreement will be tried in a court of competent jurisdiction in the County of Contra Costa, State of California, and the Parties waive all provisions of law providing for a change of venue in these proceedings to any other county. This agreement will be governed by the laws of the State of California.

25. Testimony. Consultant will testify at City's request if litigation is brought against City in connection with Consultant's services under this agreement. Unless the action is brought by Consultant, or is based upon Consultant's actual or alleged negligence or other wrongdoing, City, upon prior written agreement with Consultant will compensate Consultant for time spent in preparation for testimony, testimony, and travel at Consultant's standard hourly rates at the time of actual testimony.

26. Successors and Assigns. It is mutually understood and agreed that this Agreement will be binding upon the Parties and their respective successors. Neither this Agreement nor any part of it nor any monies due or to become due under it may be assigned by Consultant without the prior written consent of City, which will not be unreasonably withheld.

27. Section Headings. Section headings as used in this Agreement are for convenience only and will not be deemed to be a part of such sections and will not be construed to change the meaning of the section.

28. Waivers. The waiver by either Party of any breach or violation of any term, covenant, or condition of this Agreement or of any applicable law will not be deemed to be a waiver of such term, covenant, condition or law or of any subsequent breach or violation of same or of any other term, covenant, condition or law. The acceptance by either Party of any fee or other payment which may become due under this Agreement will not be deemed to be a waiver of any preceding breach or violation by the other Party of any term, covenant, or condition of this Agreement or any applicable law.

29. Entire Agreement. This Agreement, together with any other written document referred to or contemplated by it embody the entire Agreement and understanding between the parties relating to the subject matter of it. The City Manager is authorized, in consultation with the City Attorney, to agree to nonmaterial amendments to this Agreement. Neither this Agreement nor any of its provisions may be amended, modified, waived or discharged except in a writing signed by both parties.

30. Authority. The individuals executing this Agreement and the instruments referenced in it on behalf of Consultant each represent and warrant that they have the legal power, right and actual authority to bind Consultant to the terms and conditions of this Agreement.

31. Severability. If any term, provision, condition or covenant of this Agreement or its application to any party or circumstances shall be held, to any extent, invalid or unenforceable, the remainder of this Agreement, or the application of the term, provision, condition or covenant to persons or circumstances other than those as to whom or which it is held invalid or unenforceable, shall not be affected, and shall be valid and enforceable to the fullest extent permitted by law.

DocuSign Envelope ID: FCFC00B2-D385-476C-B135-220A5E783022 C.4.g
Packet Pg. 282 Attachment: Construction Testing Services, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey 8 PSA_City Attorney Approved Version 040821

32. Signatures.

32.1 Counterparts. This Agreement may be executed in two or more counterparts, each of which together will be deemed an original, but all of which together will constitute the same instrument.

32.2 Digital/Electronic Signatures. Using a City-approved method, this Agreement may be executed through the use of digital or electronic signatures in accordance with Government Code Section

16.5. The presence of an electronic signature on this Agreement will be construed as the Parties’ consent to do business electronically.

CONSULTANT:
* By:

Printed Name: Patrick Greenan
Title: President
** By:

Printed Name: Ryan Keegan
Title: CFO
CITY:

By:

Tim Y. Ogden, City Manager
ATTEST:

By:

Margaret Wimberly, City Clerk
APPROVED AS TO FORM:

By:

Damien Brower, City Attorney
If required by City, proper notarial acknowledgment of execution by Consultant must be attached. If a Corporation, Agreement must be signed by one corporate officer from each of the following two groups. *Group A. **Group B.

Chairman, Secretary,
President, or Assistant Secretary,
Vice-President CFO or Assistant Treasurer
Otherwise, the corporation must attach a resolution certified by the secretary or assistant secretary under corporate seal empowering the officer(s) signing to bind the corporation.

If an LLC:
• The Agreement must be signed by a Managing Member or the LLC must attach a resolution empowering the signatory to bind the LLC.

If a partnership:
• The Agreement must be signed by the Managing Partner or the Partner authorized to execute agreements of this type. Additional documentation, such as the partnership agreement, confirming this signature authority may be required.

If a sole proprietorship:
• The Agreement must be signed by the owner.

DocuSign Envelope ID: FCFC00B2-D385-476C-B135-220A5E783022 C.4.g
Packet Pg. 283 Attachment: Construction Testing Services, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey 9 PSA_City Attorney Approved Version 040821
EXHIBIT “A”

SCOPE OF SERVICES
DocuSign Envelope ID: FCFC00B2-D385-476C-B135-220A5E783022 C.4.g
Packet Pg. 284 Attachment: Construction Testing Services, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey Submitted By:

Construction Testing Services, Inc.
343 E. Main Street, Suite 711
Stockton, CA 94588
209.507.7555 office
209.507.7554 fax
www.cts-1.com
Submitted On: March 8, 2022
Submitted To:

City of Brentwood
Public Works Department
Attention: Renee Payette
150 City Park Way
Brentwood, CA 94513
Construction Materials Testing Services
Oakland  Pleasanton  San Francisco  Stockton  San Jose  Rocklin Statement of Qualifications to Provide
Geotechnical/Construction Materials Testing Services

INFRASTRUCTURE PROJECTS
(CITY OR DEVELOPER DRIVEN)
DocuSign Envelope ID: FCFC00B2-D385-476C-B135-220A5E783022 C.4.g
Packet Pg. 285 Attachment: Construction Testing Services, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey

TABLE OF CONTENTS
Statement of Qualifications to Provide
Geotechnical/Construction Materials Testing Services
City of Brentwood
Infrastructure Projects
(City or Developer Driven)
Brentwood, CA
March 8, 2022
A. ...................... Letter of Transmittal |1 page 1 B......................... Subcontractors & Conflict of Interest |1 page C. ....................... Submittal Approach |12 pages

APPENDIX

1......................... Resumes | (not included in page limit)

2......................... Attachment B | (not included in page limit)

3......................... Fee Schedule | (not included in page limit) DocuSign Envelope ID: FCFC00B2-D385-476C-B135-220A5E783022 C.4.g
Packet Pg. 286 Attachment: Construction Testing Services, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey Proposal to Provide
A. Letter of Transmittal
DocuSign Envelope ID: FCFC00B2-D385-476C-B135-220A5E783022 C.4.g
Packet Pg. 287 Attachment: Construction Testing Services, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey STOCKTON: 343 E. Main Street, Suite 711 • Stockton, CA 94588 • Phone (925) 462-5151 • Fax (925) 462-5183 CORPORATE: 2118 Rheem Drive • Pleasanton, CA 94588

LETTER OF TRANSMITTAL
March 8, 2022
City of Brentwood
Public Works Department
Attention: Renee Payette
150 City Park Way, Brentwood, CA 94513
Construction Materials Testing Services
RE: Statement of Qualifications to Provide for Geotechnical/Construction Materials Testing Services for Infrastructure Projects (City or Developer Driven), Brentwood, CA - CTS Proposal No. P21218 Dear Ms. Payette and Team:

The City of Brentwood is facilitating a series of upcoming capital improvement program projects to accommodate the needs of its growing population. With more growth on the horizon, we understand that securing a qualified and experienced firm that the City can trust to provide on-call materials testing services is important to the success of these projects.

Construction Testing Services (CTS) has performed services for over $30B in construction since its founding over 28 years ago. Our firm’s experience includes an abundance of experience providing construction materials testing services to both public agencies and private developers, including having been the City of Brentwood’s on-call materials testing firm of choice (2016- 2021, 2011-2013, and 2004-2006). Projects for our most recently on-call contract have included; Bocce Ball Shade Structure, Traffic Calming Install – Balfour Road Sidewalk, Storm Drain Trash Capture Devices, Fuel Dispensing System and WWTP Effluent 3-Way Diversion Valve, and the New City Hall, Community Center and Parking Garage. Recent projects include Park Way Rehab, Sunset Park Trail, Municipal Service Center, WWTP Non-Potable Storage Facility, WWTP Trial Batch, and Downtown Alley Rehab at Diablo Way. CTS staff’s knowledge of the City’s terrain as well as your procedures and protocols will allow for ease of facilitation of services under this contract.

We offer the City the following additional benefits as your geotechnical/materials testing firm of choice:
 Proximity and Local Presence. Your projects will be managed locally from our Stockton office with support from our corporate office and full-service laboratory in Pleasanton. We have more than 20 local staff who live and/or work in the Stockton and Brentwood area. Our inspectors are dispatched from their home or current project location.  Qualified/Certified Team. CTS’ proposed team for this project includes civil engineers, project management specialists, multi-disciplined special inspectors and technicians. Your assigned project manager, John Lange, along with project engineers Brad Quon, GE and Dan Ventura, PE will be dedicated to your projects. Our team possesses the certifications, experience with Caltrans’ testing methods and ASTM, budgetary forecasting and project management tools and understanding of the urgent needs associated with municipal government to help meet your infrastructure goals.  Relevant Experience. In addition to our City of Brentwood experience, municipal clients for whom we have performed similar services include the cities of Oakley, Antioch, Pittsburg, Stockton, Hayward, Fremont, Livermore, Berkeley, and Vallejo as well as Contra Costa Water District, Delta Diablo Sanitation District and Contra Costa County. Our portfolio includes the kinds of infrastructure projects that are relevant to city and developer improvements such as street, sidewalk and curb rehabilitations/reconstruction and sewer/water pipeline improvements supporting housing, mixed-use and retail communities throughout Northern California.
 Responsiveness. All CTS employees carry a company cell phone for short notice after-hours and weekend availability. We understand your projects may require full-time or part-time staff, which we can accommodate for, as well as react to immediate requests due to unforeseen changes or occurrences in construction with our 24-hour dispatch.

As president, Patrick Greenan, is authorized to negotiate on behalf of and contractually bind the firm. Please feel free to direct all questions to your contact for this proposal: John Eudy, Vice President of Operations, who can be reached at 925.462.3222 (office), 925.596.4151 (cell) and [email protected].

We look forward to working with the City and Project Team on these upcoming projects, Sincerely,
Patrick Greenan, PE John Lange
President/Principal-in-Charge Project Manager
DocuSign Envelope ID: FCFC00B2-D385-476C-B135-220A5E783022 C.4.g
Packet Pg. 288 Attachment: Construction Testing Services, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey Proposal to Provide
B. Subcontractors & Conflict of Interest
DocuSign Envelope ID: FCFC00B2-D385-476C-B135-220A5E783022 C.4.g
Packet Pg. 289 Attachment: Construction Testing Services, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey

SUBCONTRACTORS & CONFLICT OF INTEREST

SUBCONTRACTORS
A full-service firm with a staff of more than 200 personnel, including certified multi-disciplined special inspectors and technicians and full-services laboratories. Construction Testing Services (CTS)’ possesses the depth and breadth of resources to successfully complete all of the special inspections and materials testing services required in the scope of work for this contract (as outlined in Attachment A – Scope of Services). Therefore, CTS does not foresee the need to team with subcontractors at this time.

If for any reason the City needs a specialized service that does not fall under the scope of services outlined in the RFP, CTS does have working relationships with other trusted local firms. We understand that approval of the City is required and will obtain such permission as needed.

CONFLICT OF INTEREST
CTS has no real or perceived conflicts of interest for this work and is fully prepared to enter into a contract if selected to perform on-call material testing services for the City of Brentwood.

DocuSign Envelope ID: FCFC00B2-D385-476C-B135-220A5E783022 C.4.g
Packet Pg. 290 Attachment: Construction Testing Services, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey Proposal to Provide
C. Submittal Approach
DocuSign Envelope ID: FCFC00B2-D385-476C-B135-220A5E783022 C.4.g
Packet Pg. 291 Attachment: Construction Testing Services, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey

SUBMITTAL APPROACH

1. Firm’s Qualifications
Brief History: CTS was founded in 1994 in response to meeting clients’ needs for a responsive engineering and inspection consultant. CTS’ 200+ member staff includes licensed engineers, inspectors, and technicians who are experienced in all types of construction. With 28 years under our belt, Construction Testing Services, Inc. (CTS) has provided full-service special inspection, material testing, and engineering for nearly $30B in construction, ranging from infrastructure to water resource projects, pavement rehabilitations to streetscapes and beautifications projects, K-12 schools and universities to laboratories and hospital facilities, civic centers and libraries to corporate campuses, and parking structures to parking lots. Our proactive, budget-conscious management style will help you monitor your project for cost-effectiveness while covering all aspects of required inspections per approved plans and specifications; city and county, state and special district rules and regulations; and applicable Caltrans and California Building Code (CBC) requirements.

Our mission is to provide our clients with excellent customer service, quality engineers and inspectors, and to be respected in the construction industry. Our growth is directly related to our people and the professionalism we bring to the industry, as exemplified by our repeat clientele. In addition, our goal is that construction projects are built per plans and specifications, on time and under budget.

Compliance Capacity & Resources – The CTS Difference
CTS’ depth and breadth of staff include licensed civil and geotechnical engineers and certified inspectors and technicians who will be a definite asset to your projects. Our team is staffed with 200+ technical professionals with experience in preparing geotechnical investigations, special inspections for vertical and horizontal projects, and materials testing for all types of public works projects throughout Northern California. Additionally, CTS has proposed multi-disciplined special inspectors who are experienced in multiple construction techniques for various materials, allowing one inspector to cover multiple inspections at one site on the same day, a cost savings feature for the City.

CTS is proud of our ever-expanding, full-service laboratory in Pleasanton, CA. We are fully equipped to perform all materials testing including rebar tensile and bend tests, high strength bolt assembly tests, concrete, asphalt, masonry, and soils. Our testing machines have been calibrated within a period not exceeding 12 months from the time of use by devices of accuracy traceable to the National Bureau of Standards of the United States Department of Commerce. CTS continues to add on additional or new testing services, such as SuperPave testing, UPV, Crosshole Sonic Logging (CSL), and Gamma Gamma Logging (GGL) most recently.

Office Locations: CTS has seven (7) office locations from which to serve our clients’ project needs. Services on your contract will be performed at our office in Stockton and our full-service, accredited laboratory in Pleasanton.

Inspectors for this contract will be dispatched from the Stockton office, the Pleasanton laboratory, the current site location, or our staff local home location. Other CTS offices are located in San Jose, San Francisco, Rocklin, Oakland, Stockton, and Las Vegas, Nevada.

CTS Headquarters and Full-Service, Accredited Laboratory Local Office 2118 Rheem Drive 343 E. Main Street, Suite 711
Pleasanton, CA 94588 Stockton, CA 94588
Telephone: 925.462.5151 Telephone: 209.507.7555
Fax: 925.462.5183 Fax: 209.507.7554
www.cts-1.com
Business Contact Information: Please feel free to direct all questions and correspondence on behalf of the proposer to John Eudy, Vice President of Operations, and Patrick Greenan, President, who are the authorized individuals to speak for Construction Testing Services during the evaluation process. Their contact information is as follows:

John Eudy, Vice President of Operations Patrick Greenan, PE, President 415.462.3222 (office) | 925.596.4151 (cell) 925.250.7165 (office) | 925.250.7165 (cell) [email protected] (email) [email protected] (email)
DocuSign Envelope ID: FCFC00B2-D385-476C-B135-220A5E783022 C.4.g
Packet Pg. 292 Attachment: Construction Testing Services, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey

SUBMITTAL APPROACH
Staff Availability: Below is a summary of the current commitments of our proposed staff. In addition, we have a staff of over 140 inspectors and 20+ qualified engineers who are prepared to support the City projects as-needed.

Name/Role Current Availability
John Lange
Project Manager
No current full-time commitments. Currently providing oversight and budget management as-needed on various projects throughout the area.

Bradford Quon, GE
Geotechnical Engineer
No current full-time commitments. Currently providing oversight and budget management as-needed on various projects throughout the area.

Dan Ventura, PE
Engineering Manager
No current full-time commitments. Currently providing engineering support asneeded.

Ronald Harr
Field Supervisor
No current full-time commitments. Currently providing supporting inspections asneeded.

Donald “North” Shirley
Multi-Disciplined
Special Inspector
No current full-time commitments. Currently providing supporting inspections asneeded.

Jordon Sandbloom
Concrete/Soils Technician
No current full-time commitments. Currently providing supporting inspections asneeded.

John “Jake” Hiner
Multi-Disciplined
Special Inspector
No current full-time commitments. Currently providing supporting inspections asneeded.

Rolando Bachicha
Special Inspector
No current full-time commitments. Currently providing supporting inspections asneeded.

Christian Absolom
Special Inspector
No current full-time commitments. Currently providing supporting inspections asneeded.

Inspection Staff and Samples: Material samples will be transported to CTS’ full-service, fully accredited laboratory and headquarters, located about 30 miles away in Pleasanton. The inspectors are dispatched from their home or current project location, allowing for quicker response times. CTS has inspectors living in Brentwood, Knightsen, Antioch, Pittsburg and Discovery Bay. For staff, actual time starts from the point at which the inspector arrives at the jobsite. CTS has minimum hourly charges of four hours for one-half day or less and eight (8) hours for over one-half day minimums per our agreement with Operating Engineers Local 3. We are willing to negotiate minimums upon award.

DocuSign Envelope ID: FCFC00B2-D385-476C-B135-220A5E783022 C.4.g
Packet Pg. 293 Attachment: Construction Testing Services, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey

SUBMITTAL APPROACH
Staff Organizational Chart: Construction Testing Services’ (CTS) proposed team, as delineated in the organization chart below, includes highly experienced project management personnel who will be backed by a strong contingent of local multi-disciplined special inspectors and geotechnical engineers. The field personnel depicted in the organization chart were chosen specifically for their qualifications and previous technical campus experience. John Lange will be your Project Manager and primary point of contact for the duration of this project. The resumes in this proposal show the background, experience, and special capabilities of our key staff.

City of Brentwood
Geotechnical/Construction Materials Testing
Services for Infrastructure Projects (City or
Developer Driven)
Brentwood, CA
Engineering and
Testing Team
Multi-Disciplined
Special Inspectors
140+ Additional
Inspectors Available
in Northern California
Donald “North” Shirley
Jordan Sandbloom
John “Jake” Hiner
Rolando Bachicha
Christian Absolom
Multi-Disciplined
Special Inspector
John Lange
Project Manager
20+ Staff Engineers
and Laboratory
Technicians
Day-to-Day Contacts
Engineering Team
Field Inspections
Bradford Quon, GE
Geotechnical
Engineer
Ron Harr
Dan Ventura Field Supervisor , PE
Engineering Manager
DocuSign Envelope ID: FCFC00B2-D385-476C-B135-220A5E783022 C.4.g
Packet Pg. 294 Attachment: Construction Testing Services, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey

SUBMITTAL APPROACH

2. Project Team
Our multi-disciplined, local inspection team is experienced in providing services for public on-call projects similar in nature to the City of Brentwood’s upcoming contract. We offer the City a team with insight into the City of Brentwood’s terrain, plans & specifications, and protocol & standards from our work on various infrastructure projects under our previous on-call contracts. We have augmented your inspection team with local technicians with extensive backgrounds in providing for the on-call infrastructure needs of municipal agencies, including the City of Brentwood’s.

The following is a list of our proposed project team with a brief project role overview. Resumes for the proposed team members and our principal-in-charge showing their project experiences, credentials, achievements, and leadership role on the project are attached in Appendix, Section 1.

Name/Role Overview
John Lange
Project Manager
John’s role as project manager involves providing his clients with a monthly budget analysis showing the actual inspection costs compared to the original estimate. CTS has provided John meets with his clients’ project representatives regularly (at least once per month) to review progress, ensure proper allocation of resources and general satisfaction with CTS’ services. He is also a key participant in project kick-off meetings.

Bradford Quon, GE
Geotechnical Engineer
Brad has more than 21 years of experience performing geotechnical engineering design and construction services for public works infrastructure-related construction, including levees and flood control projects. Brad is CTS’ geotechnical engineer for company-wide projects. In this capacity, he performs geotechnical engineering and services clientele issues when needed.

Dan Ventura, PE
Engineering Manager
Dan assists our project managers in reviewing inspection reports and laboratory reports for conformance with construction documents and applicable code. Dan will oversee all material testing services for this project in our Pleasanton laboratory as well as review inspection reports for conformance with the project’s plans and specifications and all applicable codes.

Ronald Harr
Field Supervisor
As field supervisor, Ron is responsible for quality control of our dispatching department and assures that all our inspectors are properly certified for the tasks assigned. Ron is also responsible for site visits and troubleshooting any onsite exceptions. In his role at CTS, Ron has provided field supervision, dispatch, inspections relief and project estimating services.

Donald “North” Shirley
Multi-Disciplined
Special Inspector
North provides quality assurance and quality control, to ensure projects are built in accordance with approved plans, specifications, and specified codes, as a multi-disciplined special inspector to the City of Brentwood projects.

Jordon Sandbloom
Concrete/Soils Technician
Jordan will use his experience sampling and inspection of reinforced concrete, post-tension concrete, masonry construction, wood framing, and earthwork/asphalt/soils compaction-related projects, as a concrete/soils technician to the City of Brentwood projects
John “Jake” Hiner
Multi-Disciplined
Special Inspector
Jake will bring his experience with inspections on soils, asphalt and concrete construction for both public and private major construction projects, and experience working with various projects performing geotechnical reports, testing, monitoring, inspection, quality control and assurance, as a multi-disciplined special inspector to the City of Brentwood projects.

Rolando Bachicha
Special Inspector
Ronaldo specializes in soils observation and compaction testing and will bring his experience as a special inspector to the City of Brentwood projects.

Christian Absolom
Special Inspector
Christian specializes in soil field density testing, grading observation and testing, concrete inspection as well as soil and asphalt concrete laboratory testing, and will bring his experience as a special inspector to the City of Brentwood projects.

We employ more than 140 multi-disciplined special inspectors and our experience with the urgent needs of clients translates to the type of proven ability to respond to the project team’s demands for:
 Concurrently dispatched inspectors to multiple sites with less than four hours of notice and  Onsite and offsite service 24 hours per day/7 days per week (including swing and graveyard shifts) Following is CTS personnel shown by type and position:

Principal-in-Charge – 1 Civil Engineers – 6
Geotechnical Engineers – 2 Project Managers – 12
Staff Engineers – 12 Field Supervisors – 4
Laboratory Technicians – 27 Soils/Geotechnical Technicians – 51 Senior Level Special Inspectors – 64 Special Inspectors – 81 Administration – 42 Interns – 10
DocuSign Envelope ID: FCFC00B2-D385-476C-B135-220A5E783022 C.4.g
Packet Pg. 295 Attachment: Construction Testing Services, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey

SUBMITTAL APPROACH

3. Project Experience
Recent projects for whom CTS has had direct involvement in the planning, design and/or construction phases:

City of Alameda, On-Call Geotechnical & Quality Assurance Services, Alameda, CA Budget: 500,000
Scheduled Completion: 2020
Client References: Maria Sanchez, Executive Assistant City of Alameda Rent Program | 510.747.7935 Project Team: Steven Gonzalez, Project Manager; Dan Ventura, Associate Engineer; John Eudy, Project Manager; Gavin Lynch, Staff Engineer; Scott Krietzburg, Inspector; Chase Adams, Inspector; Rolando Bachicha, Inspector; Keith Viramontes, Inspector; Jonathan Banuelos, Inspector; Daryl Spieker, Inspector.

Description: CTS was chosen as the geotechnical engineering firm to provide geotechnical investigative services and quality assurance program services for various projects throughout the City of Alameda. Our second project under this on-call was the Jean Sweeney Open Space Park project. For the Jean Sweeney Open Space Park, CTS’ scope of services consists of a field exploration, laboratory testing, and report preparation. The intent of the investigation would be to explore the subsurface conditions, evaluate the samples collected through geotechnical testing, and provide the results of our findings in a geotechnical investigation report.

County of San Mateo, On-Call Geotechnical Engineering for Park Projects, San Mateo, CA Budget: $100,000 per contract term
Scheduled Completion: Ongoing
Client References: Sam Herzberg, Senior Planner, AICP, San Mateo County Parks Department | 650.363.1823 Project Team: Jonathan Felts, Project Manager; Maria Fuentes-Franco, Staff Engineer; Gavin Lynch, Staff Engineer; Dan Ventura, Associate Engineer; Alan Mendoza, Inspector; Gavin Lynch, Staff Engineer; John Harms, Staff Engineer; Ivan Trebotich, Inspector; Brad Quon, Staff Engineer.

Description: For this on-call, our work has included observation of placement of concrete for handicap ramps, curb and gutter; performing soil compaction testing for finish aggregate base rock at various locations around Virginia Avenue; and performing nuclear density tests on handicap ramp, sidewalk, curb and gutter locations. Other services we have performed involve the sampling of materials from both the plant and field including asphalt concrete, Portland Cement concrete, slurry, emulsion, aggregate base and other material as necessary for grading, paving and concrete work.

City of Pacifica, Equalization Basin, As-Needed Geotech, Pacifica, CA Budget: $33,209
Scheduled Completion: 2019
Client References: Gene Barry, PE, Vice President of 4LEAF | 925.383.4815 Project Team: John Eudy, Project Manager; Dan Ventura, Associate Engineer; Brad Quon, Staff Engineer.

Description: CTS is performing material testing and inspections for this project including concrete, shop and field welding, shore welding, bolting placement, and all earthwork activities including trench backfill, asphalt compaction, and nuclear gauge testing.

DocuSign Envelope ID: FCFC00B2-D385-476C-B135-220A5E783022 C.4.g
Packet Pg. 296 Attachment: Construction Testing Services, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey

SUBMITTAL APPROACH
City of Berkeley, On-Call Engineering Contract, Berkeley, CA Budget: $750,000 per contract term
Scheduled Completion: 2018
Client References: Kenneth Emeziem, Supervising Civil Engineer, City of Berkeley | 510.981.6444 Project Team: Kyle Greenan, Project Manager; Brad Quon, Staff Engineer; Dan Ventura, Associate Engineer; Ghulam Rajabi, Inspector; Rolando Bachicha. Inspector; Scott Krietzburg, Inspector.

Description: CTS is providing on-call geotechnical engineering, special inspections, materials testing, building inspection and CADD services for the City of Berkeley. The projects have involved geotechnical investigations as well as earthwork compaction testing, concrete placement and sampling, asphalt, structural steel and all applicable laboratory tests.

County of Alameda, On-Call Geotechnical Services, Alameda, CA Budget: 55,000
Scheduled Completion: Ongoing, 2022
Client References: Brian Laczko, Project Manager, County of Alameda | 510.272.3753/510.798.8097 Project Team: John Eudy, Project Manager; Brad Quon, Staff Engineer; Dan Ventura, Associate Engineer; John Harms, Staff Engineer; Ghulam Rajabi, Inspector; Coby Harris, Inspector, Colby Kaping, Inspector.

Description: CTS has a current on-call contract for special inspections and material testing services with the County of Alameda. CTS is also on the County of Alameda’s Recognized Special Inspection and Testing Agency list.

Various projects include Washington Township Memorial, East County Hall of Justice Geotechnical Supervision, Highland Hospital Tenant Improvements, Camp Sweeney, Santa Rita Jail and the YES Project.

Clients We’ve Contracted Similar Scopes of Services For:
• City of San Jose
• City of Berkeley
• City and County of Alameda
• City of Fremont
• City of Richmond
• City of Newark
• City of San Leandro
• City of Antioch
• City of Hayward
• City of Pittsburg
• City of Brentwood
• City and County of San Francisco
• Contra Costa County and Water District
• City of Santa Clara and Water District
• Oro Loma Sanitary District
• Zone 7 and Delta Diablo Sanitation District
• Department of General Services
• Northern California and California State Parks
Additional On-Call and Public Works Experience:
 City of Fremont, On-Call Special Inspections and Material Testing, Fremont, CA  City of Hayward, On-Call Special Inspection and Material Testing Services, Hayward, CA  City of Antioch, On-Call Materials Testing Contract, Antioch, CA  City of Berkeley, On-Call Geotechnical and Engineering Testing Support Services, Berkeley, CA  City of Brentwood Soils & Materials Testing, Brentwood, CA  City of Citrus Heights, On-Call Transportation Projects, Citrus Heights, CA  City of Colfax On-Call Material Testing Services, Colfax, CA  City of Colusa, On-Call Services, Colusa, CA
 City of Dublin, On-Call Services, Dublin, CA
 City of Galt, On-Call Engineering and Materials Testing Services, Galt, CA  City of Livermore On-Call Geotechnical Services, Livermore, CA  City of Milpitas On-Call Inspections & Materials Testing, Milpitas, CA  City of Oakland, On-Call Various Projects, Oakland, CA  City of Oakley, On-Call Geotechnical Services, Oakley, CA  City of Palo Alto, On-Call Various Jobs, Palo Alto, CA DocuSign Envelope ID: FCFC00B2-D385-476C-B135-220A5E783022 C.4.g
Packet Pg. 297 Attachment: Construction Testing Services, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey

SUBMITTAL APPROACH
 City of Petaluma Department of Public Works, Various Street Rehabilitation, Petaluma, CA  City of Pittsburg, On-Call Contract, Pittsburg, CA
 City of Pleasanton Geotechnical On-Call Services, Pleasanton, CA  City of Richmond, On-Call Construction Material Testing Services, Richmond, CA  City of Sacramento, On-Call Material Sampling and Testing, Sacramento, CA  City of Salinas, On-Call Material Testing, Salinas, CA  City and County of San Francisco On-Call Materials Testing & Special Inspection Services, CA  City of San Jose, On-Call Materials Testing Services, CA  City of San Mateo, On-Call Federally Funded Paving and Street Reconstruction, San Mateo, CA  City of San Ramon, On-Call Materials Testing and Construction Inspection Consulting Services, San Ramon, CA
 City of Santa Rosa, On-Call Engineering Professional Services, Santa Rosa, CA  City of Stockton, Materials Testing Vendor Pool Consultant, Stockton, CA  City of Vallejo DPW, Citywide Street Overlay, Vallejo, CA  City of Winters, On-Call Services, Winters, CA
 City of Yuba City, On-Call Materials Testing, Yuba City, CA  Contra Costa Water District, On-Call Material Testing, Contra Costa County, CA  Contra Costa County, On-Call Material Testing Services, Contra Costa County, CA  County of Alameda On-Call Materials Testing, Alameda, CA  County of San Mateo, On-Call Material Testing and Inspection, San Mateo, CA  County of Santa Clara, On-Call Materials Testing Services, Santa Clara, CA  Delta Diablo Sanitation District On-Call Contract, Antioch, CA  Department of General Services, State of California, Northern, CA  Oro Loma Sanitary District, San Leandro, CA
 Port of Oakland, Materials Testing and Construction Inspection On-Call Services for Capital Improvement and Maintenance Program, Oakland, CA
 Prairie City State Vehicle Recreation Area, On-Call Materials Testing and Inspections, Sacramento, CA  Sacramento Regional Transit On-Call Materials Testing, Sacramento, CA  Santa Clara County Water District, On-Call Material Testing and Special Inspections, Santa Clara, CA  Solano County, On-Call Material Testing and Construction Inspection Services, Solano County, CA  SolarCity, On-Call Material Testing and Special Inspections, Various Locations, CA  State of California, Department of Parks and Recreation  Vallejo Sanitation and Flood Control District On-Call, Vallejo, CA  Zone 7 Water District On-Call Materials Testing, Livermore, CA DocuSign Envelope ID: FCFC00B2-D385-476C-B135-220A5E783022 C.4.g
Packet Pg. 298 Attachment: Construction Testing Services, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey

SUBMITTAL APPROACH

4. Project Approach
The scope of services to be provided shall comply with the California Code of Regulations and all other related applicable standards. The inspector(s) and/or technician(s) will report to and work with City staff and will perform services including, but not limited to, observation of the contractor’s operations to ensure conformance with applicable standards. Special inspection and material testing services are to be completed within a timely manner and must comply with industry material testing standards set forth in the project specifications. Special inspection and material testing that will support all OPW and DOT divisions’ CIP projects and will include, but are not limited to:
 Concrete Testing
 Soils Compaction Testing and Materials
Analysis
 Aggregate Testing- Fine and Coarse
 Asphalt Concrete
 Slurry Seal
 Soil Corrosivity
 Reinforcing Steel
 Ph Testing
 Grout
 Asphalt Oil Content
 Structural Masonry
 Structural Steel
 Shotcrete
 Cement Treated Base
Our proposed internal management plan includes onsite and offsite special inspections and material testing services in accordance with the plans and specifications that will be provided and applicable code requirements. Before any work begins, CTS’ team will schedule a meeting to solidify a common understanding of the contract objectives and the Project Team’s expectations in procedures for each project’s plans and specifications. This will be the first step in assuring that we keep the lines of communication open between all parties involved. • Dispatch: Our inspectors are readily available; we prefer a 24-hours notice to be given prior so that we can put our best foot forward. But we also understand the complexity of schedules and schedule changes, regardless we will still work with your project team to provide services even at a moment’s notice. We hope this allows for a flexible schedule. The PMs and/or superintendent will contact our dispatcher to schedule inspections and/or sample pickups. Upon receipt of an inspection request from the project PMs and/or superintendent to our central dispatcher, ICC/AWS/ACI qualified inspectors will perform the inspection(s) as per approved project documents, applicable standards, and code requirements.
• Immediate Response: Any outstanding issues are punch-listed and reported immediately to your team for resolution. Our inspectors are equipped with the proper testing and inspection tools needed to accomplish the desired test or inspection. They also carry company cell phones and tablets, for dispatch and constant communication with supervisory staff for technical support in a timely manner. Sample pick-ups are punctual per request and transported in accordance with applicable ASTM standards to our local laboratory for further analysis and testing.
• Daily Inspection and Final Reports: We understand that the quality assurance needed for accurate reporting is important to our clients. Our approach is to provide a team that can address the required needs of the project as well as being able to quickly respond to those needs. Potential issues, if any, will be identified and rectified before being signed off. Our reporting procedures will inform you of non-conforming work immediately. Please reference the reporting procedures section below for additional information. • Engineering: Our engineers are heavily involved in our projects from report and laboratory testing reviews to actual field explorations and observations as needed. Our engineers are here to support our clients and are available for consultations and investigations. Our engineers are knowledgeable of different material types including soils, investigations, report writing, and troubleshooting possible exceptions.

Construction Support Services – In the design phase of roadway widening or new pipeline construction, for instance, we will look at the alignment and review published documents, such as geotechnical/geological data from as-builts, preliminary design plans, or maps. The intent of this preliminary pre-field activity is to identify any potential items that could impact our scope and the project. For example, if the alignment goes under a bridge or is within the public right of way, existing buried utilities or potential impact of existing foundations/structures could impact the alignment. To address this, we perform a pre-field site visit to observe and present any potential constraints to the planned scope. For example, if the site is aligned within heavily trafficked areas or within limited areas of access, we will consider alternatives, such as working at night upon approval or other alternatives as DocuSign Envelope ID: FCFC00B2-D385-476C-B135-220A5E783022 C.4.g
Packet Pg. 299 Attachment: Construction Testing Services, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey

SUBMITTAL APPROACH
necessary. We will also identify and contact the agencies from whom we will need to acquire permits as well as the jurisdictional agencies for any involved utilities and/or existing foundations so that we may effectively determine plans for coordinating and scheduling our field explorations with them.

After the pre-field activities, we will coordinate and schedule for our field exploration. Depending on the project requirements, this will include rock coring, auger boring, split spoon sampling, and or test pits to collect samples and obtain field data. Staff professionals from our firm will coordinate and perform the work under the supervision of the Geotechnical Engineer. Samples retrieved will be transported to our laboratory for further analysis and design. CTS will prepare and submit the draft plans, geotechnical-related specifications, and estimate to the City for retaining wall design, engineer’s estimates of probable construction cost, and contract specifications/special provisions.

Report Preparation – For our Geotechnical Investigation and Foundation Report, we will analyze the field and laboratory data in accordance with the generally accepted geotechnical engineering practice and guidelines. For our Preliminary Engineering and Project Design Report, we will develop and study alternatives to support the development of a preferred project design concept for environmental approval, permitting, and final design.

Foundation reports will be prepared in accordance with Caltrans’ criteria. In the construction phase, our role will include providing clarification and information about the PS&E and/or geotechnical report, reviewing and commenting on contract change orders as needed, and periodically visiting the site to observe the construction and verify general compliance with the contract documents.
• Safety: The safety of our team and those on the construction site is of utmost importance. Our team is equipped with the necessary Personal Protective Equipment (PPE) including hard hats, eye protection, safety vests, etc. Our inspectors understand the critical importance of following site safety guidelines and encourage others to do the same.
• Budget Tracking: Our monthly budget analyses are provided monthly. This tool assists our clients in tracking their testing and inspections budget. We will filter in the estimated dollar amounts per scope item from the agreed-upon preliminary estimate. These amounts are then tracked monthly and discussed with our clients. • Chain of Response:
• Principal-in-Charge: Responsible for client issues, engineering, and leading the project management team.

If any issues cannot be resolved by our project team the Principal-in-Charge is available and willing to work with the client and project team to resolve any issues. • Project Manager: Responsible for the day-to-day management of the project and overseeing the field and shop inspectors, laboratory technicians, and engineers. The Project Manager will be the main point of contact for any day-to-day issues.
• Engineers: Our in-house licensed engineers are responsible for reviewing all laboratory reports. Our technicians and managers adhere to our quality assurance program. • Dispatch: Our dispatch team is available 24-hours. Although we ask that at the very least a 24-hour notice be given, we have found inspectors for a client within an hour’s time to assist our client in meeting the project scheduling deadlines.
• Field Supervisors: We have a dedicated Field Supervisor team who spend each day traveling to various job sites within the area to assure client satisfaction and assure those project deadlines are met.

Geotechnical Investigations Approach: For projects requiring geotechnical investigations, we implement a 3 phased approach. First, we gain an understanding of the project through direct communications with your team, or through review as an RFP, as to the project definable features (i.e., roadway improvements or building). This initial understanding is supplemented with review of available published documents, geologic maps, and our project files for similar projects and likely subsurface conditions that will be encountered. Second, we develop a field investigation and laboratory testing program to fit the definable features and the subsurface conditions. For example, if there are liquefiable soils, we would collect field blow counts to verify the relative density that will help to determine cyclic resistance ratio used in liquefaction analysis. If there are proposed heavy loads from the planned structure, or if there is a subterranean structure (i.e., basement or wet well), a deeper boring may be necessary to determine the groundwater levels and perspective bearing layers for foundation design. Lastly, our reporting is a compilation of the research review, field exploration and laboratory testing program, and conclusions and recommendations based on our geotechnical engineering analysis performed for the various features. The submittal could be a preliminary or final geotechnical investigation or data report containing the geotechnical engineering parameters for use in civil and structural design. Our DocuSign Envelope ID: FCFC00B2-D385-476C-B135-220A5E783022 C.4.g
Packet Pg. 300 Attachment: Construction Testing Services, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey

SUBMITTAL APPROACH
team meets weekly to discuss the relevant projects, the project subsurface conditions and constraints, and the types of analyses needed. This provides for efficiency in report delivery.

Please observe our standard work/deliverable/expected time of completion table below; green tasks are associated with design-related work, blue with construction-related work, and gray with management-related activities.

SCOPE OF WORK DELIVERABLES EXPECTED TIME OF COMPLETION
Field Exploration Activities
Review published documents, such as
geotechnical/geological data from asbuilts, preliminary design plans or maps.

As new documents are created or as
required for the project.

Laboratory Testing
Laboratory testing is performed in our
certified geotechnical laboratories inhouse so the schedule is controlled Per test method and included in the
geotechnical report
Geotechnical Report Preparation
Analyze the field and laboratory data in
accordance with the generally accepted
geotechnical engineering practice and
guidelines.

Per project requirements. Depending
on project complexities, deliverable of
reports is usually 3 to 4 weeks
following completion of the field
exploration
Reviewing/certifying reports in a
timely manner (30 days) Engineer’s review
As reports are completed, prior to
disseminating to project team (weekly
reports)
Preparation, coordination, or review
on test reports Engineer’s review
Test reports are completed as results
are reported. All tests are completed
per code requirements.

Provide and distribute weekly
reports of all inspection activity
upon request
PDF report is emailed to client team and
posted to web
Sent week after inspections occur,
summarizing activities and providing
lab test results
Coordination and scheduling of oncall inspection services with the contractor and the project manager
Field supervision and dispatch
Inspections can be provided within 24
to 48 of being requested. CTS can also
fulfill requests at a moment’s notice
when required
Preparation of Final Affidavit/Final
Report Final Affidavit End of project/as requested by client (one week to prepare) Geotechnical Observation, GEOR
during construction
Provide clarification and information
about the PS&E and/or geotechnical
report, review, and comment on contract
change orders, and periodically visit the
site to observe the construction and
verify general compliance with the
contract documents.

As changes are made or as required for
the project.

Coordinating work plans and field
activities following protocols of
oversight agencies
Project management and QA Per project specifications/as requested by client
Meeting attendance with City staff Project management Monthly/as requested by client DocuSign Envelope ID: FCFC00B2-D385-476C-B135-220A5E783022 C.4.g
Packet Pg. 301 Attachment: Construction Testing Services, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey

SUBMITTAL APPROACH

5. Quality of Work
Communication is the key to providing our best service. Our entire inspection/technical staff carries cell phones, ensuring instant availability and communication with our dispatcher who is available for 24-hour, around-the-clock response to accommodate your staffing needs. We understand that the Project Team may require a short turnaround time to dispatch inspectors to the job site and are prepared to accommodate those needs. There have been instances in which CTS is only given a minimum of four-hours’ notice for needed field testing or cancellation of services. While CTS typically requires a minimum notice of 24-hours for assignment of field testing, we will always be available and able to staff your project’s urgent needs. CTS has successfully addressed the on-call/as-needed services need of municipal agencies. By always assigning experienced, certified, and local technicians, we ensure our ability to be there and provide quality service for your projects’ needs, even at a moment’s notice. That also includes weekends and overtime. Requests for field or offsite testing services will be set up directly through our dispatcher.

You can also count on timely test results from our lab, and even a RUSH for expedited results. CTS has the in-house capability and resources to perform a lab “rush” on samples (steel, concrete, and asphalt) coming into our lab after 3 p.m. for same-day testing. We are pleased to offer this service as a value-added benefit to our client.

We generally perform and turn around Geotechnical investigation reports within 4-8 weeks upon notice to proceed. This timing is variable but usually depends on permitting driller availability, and laboratory testing. We are flexible to complete in faster deadlines based on Client and project needs.

Laboratory testing turn around times vary depending on the test but results can be reported verbally upon completion and within 24 hours after completion for the final report.

We understand that accurate and timely reporting is important to our clients. Our approach is to provide a team that can promptly address the required needs of any given project. Problems, if any, will be identified and rectified before being signed off. Our proprietary field reporting software allows for accurate and timely reporting of results. CTS’ reporting procedures will inform you of non-conforming work immediately. • Daily Field Reports: Our inspectors digitally submit daily field reports using a proprietary cloud-based web application. Our inspectors write (DFRs) Daily Field Reports at the jobsite and can send a digital copy (PDF) to any interested party (contractor, construction manager, etc.) as required. An electronic copy is then reviewed by the CTS Engineering Team the same day or the following day. • Weekly Summary Reports: Our reporting software compiles all field/shop inspections performed during the week and generates a summary of all work done on a succinct cover page. They are reviewed and edited as needed by the Operations and Engineering teams before being finalized. Digital (PDF) reports are distributed the following week to the owner, general contractor, architect, and structural engineer via e-mail (or uploaded into your reporting system) or as requested by the client. These digital (PDF) reports summarize the weekly field and shop activities as well as lab test results. CTS can submit these reports as requested by your project team. • Electronic Lab Reports: Digital laboratory testing reports are also distributed the following week from the day the laboratory test was performed, per project specifications. Sub-standard results are immediately emailed and communicated by phone to the proper team members, as well as the owner. • Immediate Response: Any outstanding issues are punch-listed and reported immediately to the client for resolution. Our inspectors are equipped with the testing and inspection tools needed to accomplish the desired test or inspection. They also carry cell phones and tablets, which allow them to communicate with field supervisors for technical support in a timely manner. Samples are picked up timely and transported in accordance with applicable ASTM standards to our local laboratory for further analysis and testing.

Following are the standard deliverables you can expect to receive and their turnaround times:
- Daily Field Report Daily at Jobsite
- Mix Design Reviews by Engineer Within One Week of Submittal (As requested by client) - Welding Procedure Specification Review Within One Week of Submittal (As requested by client) - Weekly Typed Summary Reports Weekly Basis
- Weekly Laboratory Testing Results Weekly Basis
- Itemized Invoice with Budget Analysis Monthly Basis
- Final Affidavit End of Project/As Requested by Client DocuSign Envelope ID: FCFC00B2-D385-476C-B135-220A5E783022 C.4.g
Packet Pg. 302 Attachment: Construction Testing Services, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey

SUBMITTAL APPROACH
11x17 Drawing
Table of Contents
DocuSign Envelope ID: FCFC00B2-D385-476C-B135-220A5E783022 C.4.g
Packet Pg. 303 Attachment: Construction Testing Services, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey Proposal to Provide
Appendix:

1. Resumes
DocuSign Envelope ID: FCFC00B2-D385-476C-B135-220A5E783022 C.4.g
Packet Pg. 304 Attachment: Construction Testing Services, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey John Lange
Project Manager
Education
• BA, The Pennsylvania State
University, University Park, PA
Mr. Lange has 20 years of leadership experience and 7 managing projects for national home builders/developers. John’s role as project manager involves providing his clients with a monthly budget analysis showing the actual inspection costs compared to the original estimate. The analysis includes percentage of budget left for each line item and any additional scope. CTS has provided John meets with his clients’ project representatives regularly (at least once per month) to review progress, ensure proper allocation of resources and general satisfaction with CTS’ services. He is also a key participant in project kick-off meetings.

Select Professional Experience
City of Brentwood, Downtown Alley Rehab at Diablo Way, Brentwood, CA
CTS was chosen by the City of Brentwood on-call, and John was a Project Manager on the most recent project, Downtown Alley Rehab at Diablo Way.

This project included the installation of new water, sewer and storm drain facilities and either removal or replacement of existing infrastructure to correct existing operations and maintenance constraints. CTS’ scope on the project included geotechnical services, trench backfill, pavement baserock, and A/C compaction.

City of South Francisco, Police Operations and 911 Dispatch Center, South San Francisco
The new 43,271 sq. foot police facility will be a sophisticated modern facility. This station will increase police emergency response speed and enhance public safety by providing a state of the art 911 emergency response center. The project will provide efficient space for admin, operations, investigation, property storage, evidence storage, support services, emergency dispatch, training, and classrooms for police and community use.

Key considerations in the design include police training, education, and opportunities for the public to interface with the officers.

John is the CTS project manager on this project.

San Jose State University, Interdisciplinary Science Building and Project, San Jose, CA
CTS was chosen to work with San Jose State University on the Interdisciplinary Science Building project. The project consisted onsite testing and inspections, including rebar, concrete, elevator pit slab, footing/ grade beams, non-shrink grout, slab on grade, metal deck pours, slab on grade, ACI Technicians, mechanical pads, fireproofing substrate, cohesion/adhesion testing, structural steel welding, light gauge metal framing, epoxy bolt install observation, proof loading, and pull testing, expansion anchor install and torquer testing, and offsite testing and inspections including steel shop visual UT/MT. John was the project manager on this project.

Santa Clara University, The Sobrato Campus for Discovery and Innovation – STEM, Santa Clara, CA
CTS was chosen to work with the Santa Clara University on The Sobrato Campus for Discovery and Innovation, STEM project. CTS provided onsite testing and inspections, including concrete, rebar, elevator pit slab, footings DocuSign Envelope ID: FCFC00B2-D385-476C-B135-220A5E783022 C.4.g
Packet Pg. 305 Attachment: Construction Testing Services, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey John Lange
Project Manager
and grade beams, non-shrink grout/column baseplates, walls and columns, slab on grade, metal deck pours, ACI tech, mechanical pads on roof, masonry level 1, pre-grout rebar inspections, grout placement, fireproofing, substrate inspection, thickness testing and density sampling, cohesion and adhesion testing, structural welding, GRRC weld inspection, epoxy rebar install conversation, proof loading and pull testing, expansion anchor install observation and torque testing, and offsite testing and inspections including steel shop, BRB fabrication, steel stairs and precast panel. John was the project manager on this project.

UC Merced 2020, Merced, CA
CTS was chosen for the testing and inspections on this $1.3 Billion project which is being designed and built in three phases between 2016-2020. This project will include 13 new buildings and supporting infrastructure. The 1.2 million GSF will include academic and research space, student life facilities, 1,700 student residential beds, 1,500 parking spaces, a competition pool, a conference center, student wellness center, competition soccer/athletic field, early childhood education center expansion, and a dining facility. CTS’ scope includes inspections on concrete, reinforcing steel, masonry, structural steel, rebar sample & tag, fireproofing, epoxy bolts, floor flatness, grout, and offsite steel inspection. John helped at the end of this project with the CTS project management team to get all projects closed out.

San Jose State University, Aquatic Center, San Jose, CA CTS was chosen to work with San Jose State University on the Aquatic Center Project. CTS provided onsite testing and inspections, including concrete, rebar, auger cast piles, mat slab, footing, grade beams and pile caps, walls and columns, slab on grade, metal deck pours, ACI sampler, base plat grouting, shotcrete, precon panel placement and coring, production shotcrete, epoxy bolts proof load, wedge anchor install and torque testing, fireproofing thickness/density and cohesion/adhesion testing, structural field welding, floor flatness testing, and offsite testing and inspections including steel shop, steel and stairs, BRB fabrication and subsistence. John was the project manager on this project.

San Jose State University, South Campus Parking Structure & Sports Field Facility, San Jose, CA
CTS was chosen to work with San Jose State University on the South Campus Parking Structure and Sports Field Facility project. CTS provided onsite testing and inspections, including rebar, concrete, elevator pit/slab, footing and grad beams, non-shrink grout, slab on grade, PT deck and beams pour, ACI tech for elevated pours, masonry level B, pre-grout rebar inspections, grout placement, structural welding, epoxy rebar install operation, expansion anchor install and torque testing, and offsite testing and inspections including steel shop visual UT/MT. John was the project manager on this project.

DocuSign Envelope ID: FCFC00B2-D385-476C-B135-220A5E783022 C.4.g
Packet Pg. 306 Attachment: Construction Testing Services, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey

Bradford L. Quon, GE
Geotechnical Engineer
Education
• BS, Civil Engineering, University
of the Pacific, Stockton, 1998
• Geopier Soil Reinforcement
Technical Training
Professional Registrations
• Professional Civil Engineer,
State of California, No. C62900
• Professional Civil Engineer,
State of Nevada No.018589
• Geotechnical Engineer, State of
California, No.2841
Certifications
• ACI Aggregate Base Testing
Technician, No. 01165517
• ACI Aggregate Testing Technician
– Level 1, No. 01165517
• ICC Soils, No. 00201869
• U.S. Army Corps of Engineers
Contractor Quality Control
• Concrete Masonry Testing
Technician, CMTT 6205
• CPN Radiation Safety Officer
• CPN Radiation Safety & Use of
Nuclear Gauges
• Geopier Soil Reinforcement
Technical Training
Mr. Bradford (Brad) Quon has more than 21 years of
experience performing geotechnical engineering design and construction services for public works infrastructure-related construction, including levees and flood control projects. His role on these has included performing field explorations, laboratory testing of soils, geotechnical engineering analysis (i.e. slope stability and seepage analyses using Geo-Slope software), and report preparation for over 100 projects. He has observed and inspected the geotechnical aspects of
numerous projects during construction including roles as field technician, project engineer, resident engineer, and
geotechnical engineer-of-record. His expertise includes observing and inspecting foundations and earthwork
operations, including performing oversight as Geotechnical Engineer-of-Record. Brad is CTS’ geotechnical engineer for company-wide projects and performs geotechnical
engineering and services clientele issues when needed.

Select Project Experience
City of Brentwood, On-Call Material Testing, Brentwood, CA
Brad was the assigned engineer for this on-call material testing contract. All questions from the onsite technicians and reports were reviewed by Brad directly. Projects under this contract included Traffic Calming Install at Balfour Road Sidewalk, Bocce Ball Shade Structure, Storm Drain Trash Capture Device. WWTP Effluent 3-Way Diversion Valve and Fuel Dispensing System.

City of Brentwood, Civic Center and Garage, Brentwood,
CA
Brad performed geotechnical engineering support services on this $75M project. The Civic Center project included a
7,200sf council chambers building, a 55,000sf city hall, a 32,000sf community center and parking structure. The new council chambers building is a single-story building,
approximately 30 feet in height, with seating for 150 people, a closed session meeting room with galley, restroom facilities and a technology room. All new structures meet the LEED Certified-level standards. The parking structure houses 280 stalls to accommodate the new civic center and patrons of the library and downtown.

City of Fremont, On-Call Special Inspections and
Material Testing, Fremont, CA
As CTS’ senior project engineer for the City of Fremont’s oncall contract, Brad has provided engineering services and oversight for various roadway projects including Bay Street Streetscape, Citywide Intersection Ramps and G, I, J
Streetscape projects. His role included reviewing all AC tests for conformance with Caltrans standards and plans and specifications and preparation of summary of all results.

Improvements on these projects involved removing utility DocuSign Envelope ID: FCFC00B2-D385-476C-B135-220A5E783022 C.4.g
Packet Pg. 307 Attachment: Construction Testing Services, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey

Bradford L. Quon, GE
Geotechnical Engineer
poles and relocating overhead utilities lines underground as well as widening sidewalks, adding new curbs, and
resurfacing the streets.

City of Sunnyvale, Sunnyvale Downtown Bridge Rehab,
Sunnyvale, CA
Brad was CTS’ senior project engineer for this $22.3 million project in which the project will widen the bridge and
approaches to provide standard lane, shoulder, and ramp widths; rebuild the off-ramp to a standard configuration, providing access to both East- and West-bound Evelyn; and improve curbs/barriers, sidewalks and pedestrian ramps to meet all accessibility requirements. Brad’s role includes reviewing all reports for compliance with the project’s plans and specifications and all applicable ASTM and Caltrans construction code.

City of San Mateo, Street Rehabilitation at Various Locatio on Federal Aid Routes, San Mateo, CA
Brad was project engineer and geotechnical engineer for the first two projects under this on-call contract. For the federally funded, 3-phase 2010 Street Resurfacing project and 2011 Sidewalk project, CTS is performing testing and inspection at various locations on federal aid routes throughout the City.

Brad’s role includes reviewing all reports for compliance with the project’s plans and specifications and all applicable ASTM and Caltrans.

City of Berkeley, On-Call Engineering Contract, Berkeley As senior engineer, Brad provided oversight of the CTS
onsite soils and asphalt technicians for the pavement
investigations rehabilitations on City-wide streets, 2008- 2012. All projects went to construction under federal aid stimulus funds. Brad has been CTS’ project engineer for both University Paving Phase 3 and 830 University Ave
Investigation for which CTS is providing soil and AC
compaction tests as well soils investigation and CDBG
upgrade. He is currently providing engineering services for the Subsurface Soil Investigation and Testing Services for the West Street Pavement. On all investigation projects, Brad works closely with the city’s project engineer.

City of Antioch, On-Call Materials Testing Contract –
Somersville Road Bridge, Antioch, CA
Brad was the project engineer for this project, part of CTS’ on-call contract with the city. CTS’ scope of services
involved onsite concrete testing, field welding inspections, soil compactions tests, concrete compression tests,
compaction curves, R-value, sieve analysis, sand equivalent and durability.

DocuSign Envelope ID: FCFC00B2-D385-476C-B135-220A5E783022 C.4.g
Packet Pg. 308 Attachment: Construction Testing Services, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey Dan Ventura, PE
Engineering Manager
Education
• BS, Civil Engineering (Geotechnical
Engineering Emphasis), California
Polytechnic State University, San Luis
Obispo, CA
Registrations
• Professional Engineer, State of
California, No. C81280
Certifications
• Caltrans 105, 106, 125
(GEN/AC/AGG), 201, 202, 208, 217,
223, 226, 227, 229
•ACI Concrete Laboratory Testing
Technician – Level 1
•ACI Concrete Strength Testing
Technician
•ACI Concrete Field Testing
Technician – Grade 1
•ACI Aggregate Base Testing
Technician
•ACI Aggregate Testing Technician –
Level 1
Mr. Ventura is CTS’ associate engineer and engineering manager.

He has 16 years of experience in the industry and brings vast expertise in observations and laboratory testing on a variety of projects. Dan has performed on a wide variety of private and public projects requiring special inspection and testing for new construction. Dan assists our project managers in reviewing inspection reports and laboratory reports for conformance with construction documents and applicable codes. Dan also provides oversight to laboratory technicians to confirm work is performed per CTS’ in-house QC procedures and ASTM standards. Over his career in the special inspections field, Dan has performed and/or supervised field explorations, field/laboratory testing of materials including concrete, steel, and soils.

Dan will oversee all material testing services in our Pleasanton laboratory as well as review inspection reports for conformance with the project’s plans and specifications and all applicable building codes (state and local).

Select Professional Experience
City of Brentwood, On-Call Material Testing, Brentwood, CA Dan was the engineering/lab manager for this on-call material testing contract, he oversaw the staff engineer team and lab technicians and reviewed reports as needed. Projects under this contract included Traffic Calming Install at Balfour Road Sidewalk, Bocce Ball Shade Structure, Storm Drain Trash Capture Device.

WWTP Effluent 3-Way Diversion Valve/Fuel Dispensing System.

City of Brentwood, Civic Center and Garage, Brentwood, CA As the lead inspector on the CTS team for this City of Brentwood project, North performed observations of concrete and rebar placement for the elevator pit, footings and grade beams, as well as observations for the installation of baseplate grout, tension control bolts, stressing of PT tendons for slab on grade and epoxy-set dowels. He also reviewed welder qualifications and provided material identification and inspections for welding at the steel shop.

He also provided as needed public works inspections for the City when the City inspector was not available.

City of Palo Alto On-Call, Soils and Material Testing, Palo Alto CTS was selected by the City of Palo Alto Public Works
Department to provide as-needed soils and material testing for a variety of federally funded projects. Dan was CTS’ Staff engineer for multiple projects under this on-call including: Alma Street HSIP Project, Lytton Avenue Paving, and the Webster Street Resurfacing. Dan was CTS’ staff engineer for the Eleanor Pardee Park Project.

DocuSign Envelope ID: FCFC00B2-D385-476C-B135-220A5E783022 C.4.g
Packet Pg. 309 Attachment: Construction Testing Services, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey Dan Ventura, PE
Engineering Manager
City of Berkeley, Street Rehabilitation FY 2014, Berkeley, CA Dan is CTS’ staff engineer on this street rehabilitation project under CTS’ on-call contract. CTS’ services included earthwork compaction testing of asphalt concrete and soils as well as observation of placement of concrete and geotechnical investigation for street rehabilitation including coring for AC thickness and boring for soil samples, laboratory testing consisting of R-Values as per Caltrans Test Method 301 and report preparation for conclusions. Sampling, testing and inspection services on the roadway projects under this on-call contract are being performed in accordance with Caltrans testing methods.

City of Fremont, On-Call Special Inspections and Material Testing, Fremont, CA
Dan was CTS’ staff engineer for various projects under our on-call contract with the City of Fremont such as the Development Services Center Seismic Upgrade. CTS has been working with the City of Fremont since 2002 on various projects as part of our on-call agreement. CTS has worked under
Town of Los Gatos, Annual Street Repair and Resurfacing Asphalt Overlay, Los Gatos, CA
This asphalt overlay project included grinding of existing pavement, performing digout repairs, installing hot mix asphalt (HMA), adjusting manholes, valves, boxes, and monument covers, and installing pavement striping, markings and signs. Dan was the engineer in charge of this project, working with the onsite inspectors and the CTS laboratory.

City of Alameda, On-Call Geotechnical Investigative Services and Quality Assurance Program Services – Jean Sweeney Open Space Park, Alameda, CA
CTS was chosen as the geotechnical engineering firm to provide geotechnical investigative services and quality assurance program services for various projects throughout the City of Alameda. Dan is CTS’ associate engineer for this project. Our first project under this on-call was the Jean Sweeney Open Space Park project. CTS is performing on-call geotechnical investigative services and quality assurance including soil and groundwater investigations; design investigations including boring and material testing such as soil sampling, structural foundation analysis, HMA testing, as well as aggregate and Portland Cement sampling and testing services. For the Jean Sweeney Open Space Park, CTS’ scope of services consists of a field exploration, laboratory testing, and report preparation. The intent of the investigation would be to explore the subsurface conditions, evaluate the samples collected through geotechnical testing, and provide the results of our findings in a geotechnical investigation report.

DocuSign Envelope ID: FCFC00B2-D385-476C-B135-220A5E783022 C.4.g
Packet Pg. 310 Attachment: Construction Testing Services, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey

Ronald Harr
Field Supervisor/Multi-Disciplined Senior Inspector
Certifications
• ICC Structural Steel and Welding,
No. 1010831-85
• ICC Reinforced Concrete,
No. 1010831-88
• ICC Structural Masonry,
No. 1010831-84
• ICC Prestressed Concrete,
No. 1010831-89
• ACI Concrete Field-Testing
Technician – Grade I;
• DSA Shotcrete, No. 4769
• DSA Masonry, No. 5055
Mr. Harr has more than 28 years of experience in the
construction industry. Ron’s specialty is materials testing and inspection. In addition, Ron's experience includes performing resident inspector duties on major construction projects in the Northern California Region. His responsibilities include field observations of reinforcing steel, concrete placement,
masonry, structural steel, shear wall nailing and fireproofing.

As field supervisor, Ron is responsible for quality control of our dispatching department and assures that all our inspectors are properly certified for the tasks assigned. Ron is also responsible for site visits and troubleshooting any onsite exceptions. In his role at CTS, Ron has provided field
supervision, dispatch, inspections relief and project
estimating services.

Select Project Experience
City of Brentwood, Civic Center and Garage,
Brentwood, CA
Ron was the field supervisor for this project. He attended preconstruction meetings, performed GPR and dispatch on this $75M project. The Civic Center project included a 7,200 sf council chambers building, a 55,000 sf city hall, a 32,000 sf community center and parking structure. The new council chambers building is a single-story building, approximately 30 feet in height, with seating for 150 people, a closed session meeting room with galley, restroom facilities and a tech room Brentwood WWTP Non-Potable Storage Facility,
Brentwood, CA (P14631/14251)
The City of Brentwood plans to construct a 3-milliongallon prestressed concrete storage tank at its wastewater treatment facility. The tank will be about 25 feet in height and 170 feet in diameter. The tank will be used to store non-potable water (NPW) for the NPW distribution
system. The water will be primarily used for agriculture and landscape watering. The storage tank will likely be constructed partially below existing grade and be
supported on a perimeter ring foundation, interior column footings, and concrete slab on grade floor. The plan set shows the tank bottom at an elevation of about 38 ft and located within an existing below ground pond (Pond #8).

Due to expected operational needs, the tank will be
drained at least partially on a regular basis. Proposed improvements also include a new pump station, ancillary piping, and a small service structure to house and service equipment. The pump station wet-well foundation will be at an elevation of about 25 ft and located adjacent to and southeast of the proposed tank. The service structure will be located to the directly to the east of the existing
chlorine contact basins at existing grade.

DocuSign Envelope ID: FCFC00B2-D385-476C-B135-220A5E783022 C.4.g
Packet Pg. 311 Attachment: Construction Testing Services, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey

Ronald Harr
Field Supervisor/Multi-Disciplined Senior Inspector
City of Berkeley, On-Call Engineering Contract,
Berkeley, CA J6625
Ron worked closely with CTS’ project management and
inspections team on this on-call contract for which CTS is performing on-call engineering, special inspections and materials testing on various roadway and civic facility projects. He has been responsible for estimating and
overseeing dispatch. Additional projects have included
Clinical Health Building, Sewer Rehabilitation, Facilities Maintenance Building - Geotechnical Investigation and
Radio Tower Culvert Repair.

County of Santa Cruz, Rountree Rehabilitation/Re-Enter
Facility, Watsonville, CA (J11979/P11494)
The project entailed the construction and renovation to the expansion of the existing county jail located in
unincorporated area of Santa Cruz County near the City of Watsonville on approximately eight acres. The jail expansion created approximately 29,300 sf of new housing, visiting, administration, intake and release, and facility support. The renovations repurposed approximately 8,400 sf of the existing minimum-security building into program and support space.

The jail expansion is mainly constructed of steel, masonry, and concrete for durability. CTS provided inspections of concrete and rebar, masonry, fireproofing, steel shop and field, epoxy bolts, and geotechnical services. Ron was the field supervisor for this project and provided toque testing.

City of San Jose, San Jose Convention Center, San Jose, CA
Ron is the field supervisor for this project. CTS was awarded the special inspections, materials testing and geotechnical field services contract for the $85M McEnery Convention Center’s Expansion and Renovation Project. The scope of work on this contract includes testing and inspection of structural steel and metals, soils testing during the earthwork of the building pad and foundation work, structural concrete, structural masonry, structural wood, and fireproofing and waterproofing.

City of Antioch Brackish Water Desalination PW694,
Antioch, CA
CTS was chosen by the city of Antioch, Public Works
Department to provide material testing and special inspection for the Brackish Water Desalination PW694 project. CTS’ scope on this project included rebar, concrete, footings grade beams, non-shrink grout, walls and columns, slab on grade, metal deck pours, ACI tech, masonry level 1, structural welding, epoxy bolts, expansion anchor, geotechnical services, soils compaction, A/C compaction and steel shop visual. Ron attended the precon meeting and assisted the CTS team during the duration of the project.

DocuSign Envelope ID: FCFC00B2-D385-476C-B135-220A5E783022 C.4.g
Packet Pg. 312 Attachment: Construction Testing Services, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey

Donald “North” Shirley
Multi-Disciplined Special Inspector
Certifications
• ICC Structural Steel and
Welding
• ICC Reinforced Concrete
• ICC Structural Masonry
• ICC Prestressed Concrete
• ACI Concrete Field Testing
Technician, Grade I
• Nuclear Gauge Operator
Memberships
• International Code Council
• American Institute of Steel
Construction
Mr. Shirley has more than 15 years of combined experience in the inspection, materials testing, and construction management industries. Don has performed various inspection services that include soils placement/excavation/density testing, masonry construction, conventional and post-tensioned concrete, special moment-resisting concrete frames, shotcrete, insulating concrete fill, metal framing systems, structural steel and welding, bolting, wood framing, and firestopping. He provides quality assurance and quality control, to ensure projects are built in accordance with approved plans, specifications, and specified codes.

Select Professional Experience
City of Brentwood, Civic Center and Garage, Brentwood, CA As the lead inspector on the CTS team for this City of Brentwood project, North performed observations of concrete and rebar placement for the elevator pit, footings and grade beams, as well as observations for the installation of baseplate grout, tension control bolts, stressing of PT tendons for slab on grade and epoxy-set dowels. He also reviewed welder qualifications and provided material identification and inspections for welding at the steel shop.

He also provided as needed public works inspections for the City when the City inspector was not available.

City of Brentwood, Construction Materials Testing Services for Infrastructure Projects, Brentwood, CA
North observed placement epoxy-set all-thread bolts, sampled grout and performed torque testing for Brentwood’s Veterans Park Bocce Ball Court Shade Structure, a project under CTS’ on-call contract with the City of Brentwood and various other projects.

City of Santa Clara, Tasman Drive Parking Structure and Pedestrian Bridge, Santa Clara, CA
This new parking structure, adjacent to Tasman Drive, in Santa Clara, is a 5-level structure which will accommodate 1,890 vehicles and include ground level parking and a pedestrian bridge from the parking structure over the San Tomas Aquino Creek to the Convention Center. Because the project site has a number of environmental concerns, the project is being coordinated so as not to have impact on the creek or its inhabitants. Donald provided rebar, PT tendon and material ID inspections on this project.

City of Fremont On-Call Inspections/Materials Testing
Donald performed special inspections of the City of Fremont’s various projects as part of CTS’ on-call agreement. CTS has worked under a single contract that is renewed every two years by the city.

CTS’ on-call services have included special inspections and material testing of soils, asphalt, rebar, concrete, batch plant, shear wall nailing, epoxy bolts, proof load and structural steel welding.

Relevant projects under this contract include G,I, J Streetscape, Citywide Intersection Ramps, Bay Street Streetscape, and Niles Town Plaza.

DocuSign Envelope ID: FCFC00B2-D385-476C-B135-220A5E783022 C.4.g
Packet Pg. 313 Attachment: Construction Testing Services, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey

Donald “North” Shirley
Multi-Disciplined Special Inspector
Port of Oakland, On-Call Materials Testing & Construction Inspection Services, Airport Terminal 1, M-102 Substation, Oakland, CA
Donald performed concrete placement inspections for the M-102 Substation at Oakland International Airport. This first project under CTS’ on-call contract with the Port of Oakland (No. 11-125-3) involves the construction of a new electrical substation and includes onsite material testing of structural steel, bolts, concrete, CMU, roofing, soils, A/C and micropiles. CTS has also performed steel shop inspection at Glazier Iron in Hayward. All work is being performed per plans and specifications and City of Oakland Building Department’s regulations.

City of Oakland, Golden Gate Recreation Center, Oakland, CA North was one of the inspectors on this project, which required intermittent inspections for the construction inspector as part of our on-call contract with the City. North provided shear wall nailing inspections for this modernization.

Contra Costa Water District, On-Call Material Testing, CA Donald is providing special inspections as a member of CTS’ project team for this on-call contract. The scope of services for these projects will include aggregate base, AC, concrete, coring services, grout, reinforcing steel, shotcrete, structural masonry, structural steel, welding and NDT.

City of Berkeley, On-Call Engineering Contract, Berkeley, CA As a member of the CTS team, Donald has provided special inspections on the Fire Warehouse, Facilities Maintenance Building, and Fire Station No. 5. His services have included observing the placement of lift grout, rebar, dowels, and welding performed in progress. CTS is providing on-call engineering, special inspections and materials testing for the City of Berkeley. Additional City of Berkeley projects have included Clinical Health Building, Sewer Rehabilitation, Facilities Maintenance Building - Geotechnical Investigation and Radio Tower Culvert Repair.

City of Hayward, On-Call Inspection and Materials Testing, Hayward, CA
Donald provided soil testing for the Centennial Hall Building D project, part of CTS’ on-call contract with the City of Hayward. CTS provides various on-call service including field inspection of soils, asphalt, concrete, steel, rebar and dowels. CTS’ services include laboratory testing, such as compaction curves, sieve analysis, sand equivalent, specific gravity and rebar tensile tests.

City of Antioch, Hillcrest Widening Phase 2, Antioch, CA North was a special inspector on the CTS team for this project, part of our on-call contract. North performed special inspections and material testing for the involving soil compaction testing and preparing asphalt sampling for testing.

DocuSign Envelope ID: FCFC00B2-D385-476C-B135-220A5E783022 C.4.g
Packet Pg. 314 Attachment: Construction Testing Services, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey Jordan Sandbloom
Soils, Asphalt and Concrete Inspector
Certifications
• ACI Field Testing Technician, Grade
I, No. 01200480
• Nuclear Gauge Operator, No. 16641
• ICC Spray Applied Fireproofing,
No. 8158082
• ICC Structural Masonry, No.
8158082
Mr. Sandbloom has 12 years of experience in the construction industry. He is experienced with the sampling and inspection of reinforced concrete, post tension concrete, masonry construction, wood framing, and earthwork/asphalt/soils compaction-related projects. Jordan is a resident of the City of Brentwood.

Select Professional Experience
City of Brentwood, Civic Center and Garage, Brentwood, CA Jordan sampled concrete mix as a member of the CTS team providing special inspections and material testing on this civic center, community park and parking garage project in Brentwood.

City of Antioch, On-Call Materials Testing – CDBG Downtown Pavement, Rehabilitation Phase 5, Antioch, CA
Jordon performed soil compaction testing and observed placement of geo-synthetic fabric over native material and compaction of recycled asphalt base for this project to rehabilitate the downtown streets of Antioch. All roadwork, including testing and inspection of subgrade was performed per Caltrans and the City’s QAP.

City of San Mateo, Street Rehabilitation at Various Locations on Federal Aid Routes - Delaware Street Bike Lane, San Mateo, CA Jordon’s responsibilities on this project as a member of CTS’ onsite inspection team — one of various reconstruction and rehabilitation projects under this on-call contract — included compaction testing of sidewalk path subgrade at 16th Street and Delaware. In this role, he also performed nuclear density testing. CTS is performing testing and inspections at various locations on federal aid routes throughout the city. Projects have included repair and preventative maintenance treatment to local, collector and arterial streets. Jordon has provided concrete sampling services.

City of Hayward, On-Call Materials Testing and Special
Inspection - Pavement Recon FY12, Hayward, CA
Jordon performed compaction testing on freshly placed AC as a member of the CTS onsite inspection team for this project under our on-call contract to perform testing and inspection services on city projects.

Contra Costa Water District, On-Call Material Testing,
Concord, CA
Jordan performed concrete sampling services for the Esperanza Main/Valve Replacement, part of our on-call contract to provide material testing services. The scope of services for these projects includes aggregate base, AC, concrete, coring services, grout, reinforcing steel, shotcrete, structural masonry, structural steel, welding and NDT.

SFPUC, Alameda Siphon No. 4, Sunol, CA
This project will construct a 66-inch diameter steel pipeline, 96-inch diameter blending structure, install new isolation/throttling valves on Alameda Siphons 1, 2, 3 and 4, also to construct ventilation improvements at Alameda East Portal and chemical injection facilities on Siphon 4. Jordan has performed concrete sampling for this project.

DocuSign Envelope ID: FCFC00B2-D385-476C-B135-220A5E783022 C.4.g
Packet Pg. 315 Attachment: Construction Testing Services, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey John “Jake” Hiner
Soils, Asphalt and Concrete Materials Tester
Education
• MS, W.V. Graduate College,
Environmental Science, 2000
• BS, Geology, Marshall
University, Huntington WV, 1995
Certifications
• Caltrans 125 GEN/AC/AGG,
231, 375, 504, 518, 533, 539, 540,
556, 557
• ICC Soils
• ICC Reinforced Concrete
• ACI Field Testing Technician,
Grade I
• CAL OSHA 10-HR Safety
• NICET - Level 1, Construction
Materials Testing
Asphalt/Concrete/ Soils, No.
104059
• Transportation Worker
Identification Credential (TWIC)
• Port of Oakland Badged
Mr. Hiner has over 23 years of experience in the construction industry. He is experienced with inspections on soils, asphalt and concrete construction for both public and private major construction projects. Jake is highly experienced working with various projects performing geotechnical reports, testing, monitoring, inspection, quality control and assurance.

Select Project Experience
City of Brentwood, Civic Center and Parking Garage,
Brentwood, CA
Jake was a special inspector on this very important project for the City of Brentwood. CTS is the firm of choice to perform special inspections and material testing on this civic center, community park and parking garage project in Brentwood.

Jake’s role has included performing soil compaction testing.

Observed placement and compaction of aggregate base rock utility yard between City hall and parking structure. He also performed two nuclear density tests at finish base grade, soil compaction testing and soil observation of earthwork activities, and tested finish subgrade at 2nd Street and Oak Street ramp at north side.

City of San Mateo, Delaware Sanitary Sewer, San Mateo,
Jake performed soil compaction testing on trench backfill for a 24 inch sanitary sewer line and observed the contractor backfill of the section of sewer. This project was part of CTS’ on-call contract with the City.

City of Sunnyvale, Sunnyvale Downtown Bridge Rehab,
Sunnyvale, CA
CTS provided QA/verification services for special inspections as a member of PSC's QA services team for Downtown
Mathilda Bridge Project which improved the Mathilda Avenue Bridge over Caltrain tracks and Evelyn Avenue. Special
inspections involve welding, concrete, soil, and NDT testing.

Jake performed soils compaction testing for the CTS team.

City of Berkeley, Sewer Rehab Tributaries, Berkeley, CA Jake performed soil compaction testing and soil observation of earthwork activities for sewer trench backfill. This project was part of CTS’ on-call contract with the City of Berkeley. Other projects Jake has provided special inspection services on under this contract include drainage/sink hole repairs, Euclid Drain Repair, and Sewer Rehabilitation, Alcatraz. CTS is providing on-call engineering, special inspections, materials testing, building inspection and CADD services for the City of Berkeley.

DocuSign Envelope ID: FCFC00B2-D385-476C-B135-220A5E783022 C.4.g
Packet Pg. 316 Attachment: Construction Testing Services, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey John “Jake” Hiner
Soils, Asphalt and Concrete Materials Tester
City of Fremont, Bay Street Streetscape, Fremont, CA
Jake performed nuclear density for testing on existing sub grade of curb and gutter and sidewalk and observed and
sampled concrete. All nuclear density tests were performed per Caltrans Test Method 231. Jake worked closely with the City engineer and contractor on this project.

City of Antioch, Lonetree Way Improvements/Hillcrest
Avenue Widening, Antioch, CA
These roadway improvement projects were part of our on-call contract with the City of Antioch to provide special inspections and materials testing services. CTS performed soil compaction testing on finished grade AB, on-site concrete testing, concrete compression tests, compaction curves, r-value, sieve analysis, sand equivalent and durability. Jake was our lead inspector performing soil compaction testing.

City of Fremont, Niles Blvd. Improvement, Fremont, CA
As a special inspector of the CTS Team, Jake performed
nuclear density tests for this $2.78M roadway improvement project located on Niles Boulevard between the Sullivan Underpass and the California Nursery Historic Park, just west of Hillview Drive. The project plans included reconstruction of the pavement, installation of new curbs, gutters and sidewalks, upgrades to intersections with ADA-compliant ramps to improve pedestrian access, and installation of bulbouts and speed tables to reduce the speed of vehicular traffic.

CTS has been working with the City of Fremont since 2002 on various projects as part of our on-call agreement. CTS has worked under a single contract that is renewed every two years by the City of Fremont. CTS and the City of Fremont have created a process to ensure that each project runs smoothly – from task order to dispatch and monthly budgets.

Caltrans/CCTA/ACCMA, Caldecott Tunnel, Orinda, CA
Jake sampled grout for the placement of soil nails, as well as performed nuclear density testing on the storm drain trench backfill per Caltrans Test Method 231 for this $420M project to build a two-lane fourth tunnel bore north of the existing three Caldecott tunnels. CTS is the firm of choice to provide inspections and testing on this project including concrete, grout, mortar and shotcrete inspections and compression tests, concrete shrinkage tests, shotcrete needle penetration tests, swell potential tests and Atterberg limits.

DocuSign Envelope ID: FCFC00B2-D385-476C-B135-220A5E783022 C.4.g
Packet Pg. 317 Attachment: Construction Testing Services, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey Rolando Bachicha
Special Inspector
Education
• Rizal Technological University,
B.S Civil Engineering
Certifications
• Nuclear Gauge
• Caltrans CT 125
AGG/HMA/GEN, 231, 375
Rolando has more than 25 years of experience in the construction industry with 22 of those years in materials testing. Mr. Bachicha specializes in soils observation and compaction testing.

Select Professional Experience
City of Brentwood WWTP Storage Non-Portable Storage Facility, Brentwood, CA
The City of Brentwood planned to construct a 3-million-gallon prestressed concrete storage tank at its wastewater treatment facility.

The tank is about 25 feet in height and 170 feet in diameter. The tank is intended to be used to store non-potable water (NPW) for the NPW distribution system. The water will be primarily used for agriculture and landscape watering. The storage tank was constructed partially below existing grade and be supported on a perimeter ring foundation, interior column footings, and concrete slab on grade floor. The plan set showed the tank bottom at an elevation of about 38 ft and located within an existing below ground pond (Pond #8). Due to expected operational needs, the tank was be drained at least partially on a regular basis. Proposed improvements also included a new pump station, ancillary piping, and a small service structure to house and service equipment. The pump station wet-well foundation will be at an elevation of about 25 ft and located adjacent to and southeast of the proposed tank. The service structure will be located to the directly to the east of the existing chlorine contact basins at existing grade.

City of Oakland On-Call Citywide Pavement Resurfacing,
Oakland, CA
The City of Oakland seeked to establish on-call paving contractor to provide on-call paving services. Typical paving projects at various locations of City of Oakland consists of pavement rehabilitation, pavement reconstruction, base repair, crack sealing, micro surfacing, speed bump, removal and replacement of concrete sidewalk, removal and replacement of curb and gutter, removal and replacement of concrete ADA ramp (w/truncated dome), installation of concrete ADA ramp (w/truncated dome),removal and replacement of traffic striping , removal and installation of pavement markings, installation of flexible delineators and K-71 marker posts, installation of channelizing curb system, installing modular segregating curb pieces, installing modular loading platform, and all associated work. Upon establishment of the on-call paving contract, task assignments which include specific project related scope and time of completion will be issued to the selected on-call contractor.

City of Pacifica EQ Basin, Pacifica, CA
The Project included the installation of a 2.1‐million‐gallon capacity EQ basin, two diversion structures to passively divert excess flows from the existing Linda Mar Boulevard and Arguello Boulevard sanitary sewer lines and transport the flow via a conveyance pipeline to the EQ basin during storm events, an effluent conveyance pipeline routing flows to the existing Crespi Drive sanitary sewer line and the DocuSign Envelope ID: FCFC00B2-D385-476C-B135-220A5E783022 C.4.g
Packet Pg. 318 Attachment: Construction Testing Services, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey Rolando Bachicha
Special Inspector
Linda Mar Pump Station, a 10‐foot‐tall motor control center (MCC) building equipped with a 4‐foot‐high metal antenna that would allow radio communication with the City’s Calera Waste Water Treatment Plant, a ventilation and odor control system, and a
potable‐water‐supplied cleaning system within the EQ basin. The EQ basin will be constructed within the parking lot for the City’s Skatepark and immediately southwest of the City of Pacifica’s Community Center (located at 540 Crespi Drive) on the east side of SR‐1.
2019 Pavement Maintenance Project – Phase 2, Belmont, CA The City of Belmont invited sealed bids for public project construction described as: 2019 Pavement Maintenance Project – Phase II, City Contract Number (CCN) 2019–582. The public project construction is more specifically defined in the Contract Documents, but generally includes the following items of work: providing traffic control, providing construction area signs, providing water pollution control, applying Type II slurry seal, applying hot mix asphalt (HMA), dig out areas of local damage, removal and replacement of thermoplastic striping and pavement markers, installation of shoulder backing, constructing PCC curb, gutter, and swale, construction of speed hump, cleaning of the sites at the end of the job, and the furnishing of all labor, materials, tools, equipment, mechanical workmanship, transportation, and services necessary to be done in order to perform a complete job in all respects as indicated on the plans on various streets in the City of Belmont (the “Work”).

City of San Leandro Annual Street Overlay Rehabilitation 2017- 18, San Leandro
In 2017 the Mayor and City Council announced the start of construction on nearly $14 million of street rehabilitation work, the largest investment in reconstruction of San Leandro streets in decades.

The street projects rehabilitated over 27 lane miles on 78 street segments and update 143 accessible sidewalk ramps throughout the city. Rolando was responsible for Nuc. Gauge Compact Testing for this project.

BART El Cerrito Del Norte Station, El Cerrito, CA
BART was to be upgraded and expanded in El Cerrito del Norte to relieve crowding, improve accessibility, reduce fare evasion, and enhance the customer experience. Improvements included station agent booth, new fare gates, new elevators and restrooms, as well as ADA improvements. Rolando was a special inspector for this project. He provided soils compaction testing and sampling.

DocuSign Envelope ID: FCFC00B2-D385-476C-B135-220A5E783022 C.4.g
Packet Pg. 319 Attachment: Construction Testing Services, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey Christian Absolom
Materials Tester
Certifications
• Caltrans 231, 375
• ACI Grade I
• OSHA 40-Hour

HAZWOPER
• OSHA 29 CFR
1910.120[e]
• Radiation
Safety/Nuclear Gauge
Mr. Absolom has over 32 years of experience in the construction industry and serves as a field inspector for CTS. His background includes both field inspection and testing and laboratory testing.

Christian specializes in soil field density testing, grading observation and testing, concrete inspection as well as soil and asphalt concrete laboratory testing.

Select Project Experience
City Campbell, Annual Street Maintenance 16-BB
This project involved material testing and inspection services for local street sealing at various locations within the City. Christian performed material testing of soils and also performed observation of earthwork activities.

City of Palo Alto, Hoover Park Tennis Courts
Christian provided soils inspections for the City of Palo Alto Terman tennis courts repair project. The project consisted of removing existing court surfaces, installing new base rock (taking samples of base rock and providing compaction tests, and then repaving both courts and providing asphalt cures and resurfacing courts.

City of San Leandro, San Leandro Boulevard Rehab
Christian provided soil inspections and sampling on this project for the City in which CTS performed inspection and testing for soil compaction, aggregate testing, earthwork observation and asphalt concrete compaction testing. Construction included roadway rehabilitation for a strip of roadway from Williams Street to Hudson Lane in San Leandro.

City of Berkeley, FY2015 Measure M Street Surface Seal Project Christian was the lead soils technician on this project providing quality control services. He provided soil observations, sampling and testing and AC compaction testing. The project involved the rehabilitation of

6.7 miles for city streets and consisted of slurry seal and rubberized cape seal of selected streets. The City is making repairs to the street conditions and adding innovative green infrastructure to improve storm water quality.

City of Fremont 2019 Pavement Rehabilitation, Fremont, CA The Project is located at various citywide locations, and consists of the following work: Furnishing and maintaining traffic control; protecting or adjusting utility facilities, removing asphalt concrete roadway surfacing by grinding and excavating; performing hot mix asphalt base repairs; replacing traffic signal detector loops and related facilities; sealing pavement cracks; placing pavement fabric, placing hot mix asphalt overlays; installing speed lumps; removing and installing roadside signs; placing thermoplastic traffic stripes, pavement markings, and reflective pavement markers; adjusting monument boxes located outside of pavement work limits citywide; and other related work.

DocuSign Envelope ID: FCFC00B2-D385-476C-B135-220A5E783022 C.4.g
Packet Pg. 320 Attachment: Construction Testing Services, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey Proposal to Provide
Appendix:

2. Attachment B
DocuSign Envelope ID: FCFC00B2-D385-476C-B135-220A5E783022 C.4.g
Packet Pg. 321 Attachment: Construction Testing Services, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey

SPECIAL INSPECTION &

TESTING AGREEMENT
Neighborhood
Services
Effective:

Revised: May 7, 2018
150 City Park Wy, Brentwood, CA 94513 (925) 516-5405 Voice (925) 516-5407 Fax

STRUCTURAL TESTS & INSPECTIONS SCHEDULE
REINFORCING STEEL:
__ Tensile & Bond
__ Inspection of Placement
__ Inspection of Welding
STRUCTURAL STEEL:
__ Sample & Test
__ Shop Indent. & Welding Inspection
__ Shop Ultrasonic Inspection
__ Shop Radiography
__ Field Welding Inspection
__ Field Bolting
__ Field Ultrasonic Inspection
__ Field Radiography
__ Metal Deck Welding Inspection
MASONRY:
__ Preliminary Acceptance Tests (masonry units, wall prisms) __ Subsequent Tests (mortar, grout, field wall prisms)
__ Inspection of Grouting
__ Inspection of Placement & Grouting
Conc Shot‐
crete
Grout Mortar
Agg. Tests for Designs
Suitability of Agg.

Mix Designs
Test Panel
Batch Plant Insp.

Cement Grab Sample
Inspect Placing
Compression Tests
Cast Specimens
Pick‐up Samples
Shrinkage Bars
Yield Check
Air Check
Dry Unit Weight
PILING, CAISSONS, CAPS, TIES:
__ Inspection of Reinforcing Placement
__ Inspection of Concrete Placement
__ Inspection of Concrete Batching
STRUCTURAL HARDWARE:
__ Holdown Installation
__ Tiedown System Installation
__ Epoxied Anchors & Bolts
INSULATING CONCRETE:
__ Sample & Tests
__ Unit Weights
FIREPROOFING:
__ Inspection of Placement
__ Density Tests
__ Thickness Tests
__ Inspect Batching
GEOTECHNICAL: (Inspections & Testing by Geotechnical Engineer) __ Fill Material Acceptance Tests
__ Moisture‐Density Determination
__ Field Density/Compaction
__ Pier Drilling
__ Observation & Testing by Soils Engineer
UNDERPINNING:
__ Inspection of Steel Fabrication
__ Inspection of Reinforcing & Forms
__ Inspection of Concrete Placement
__ Inspection of Tiebacks
ROOFING & WATERPROOFING:
__ Inspection of Placement
__ Sample & Test
__ Basement Waterproofing
CONCRETE, GUNITE, GROUT & MORTAR:

PRECAST CONCRETE:
__ Reinforcement Tests
__ Inspection of Reinforcing Placement
__ Tendon Tests
__ Inspection of Tendon Placement
__ Inspection of Concrete Placement
__ Inspection of Concrete Batching
__ Inspection of Panel Attach & Inserts
__ Inspection of Panel Installation
__ Compression Tests
__ Inspection of Stressing/Transfer
STRUCTURAL WOOD:
__ Inspection of Fabrication
__ Inspection of Truss Joist Fab.
__ Sample & Test Components
__ Inspection of Glu‐lam Fab.
__ Shearwall Construction & Nailing
OTHER TESTS OR INSPECTIONS:
____________________________________________________
____________________________________________________
____________________________________________________
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
Firestopping
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
DocuSign Envelope ID: FCFC00B2-D385-476C-B135-220A5E783022 C.4.g
Packet Pg. 322 Attachment: Construction Testing Services, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey Proposal to Provide
Appendix:

3. Fee Schedule
DocuSign Envelope ID: FCFC00B2-D385-476C-B135-220A5E783022 C.4.g
Packet Pg. 323 Attachment: Construction Testing Services, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey Standard
* FIELD INSPECTION AND LABORATORY SERVICE Rate/Hour
Steel Visual $230.00
Nondestructive - UT, MT, PT $235.00
Steel Visual/UT Combination $235.00
Concrete ACI $230.00
Concrete ICC $230.00
Masonry $230.00
Fireproofing $230.00
Shear Wall Nailing/Framing/Hold Downs $230.00
Soil Technician w/Nuclear Gauge and/or Sand Cone (portal-to-portal) $230.00 Asphalt Technician (portal-to-portal) $230.00
Shoring/Soldier Piers $230.00
Roofing & Waterproofing $230.00
Multi-Disciplined Inspector $230.00
Inspector Requiring G1 Pay Grade $280.00
Specialty Inspector or Where Formal Certification is Required $230.00 Field Inspector with Special Enhancement $230.00
Safety Manager/Safety Inspector/Jobsite Safety Accountability Supervisor (JSAS) $500.00 Laboratory Technician $230.00
Additional Sample Preparation Time $230.00
Technician Typist $230.00
**PROFESSIONAL ENGINEERING SERVICES
Principal Engineer (Civil/Structural) $365.00
Geotechnical Engineer $320.00
Professional Geologist $305.00
Consulting Engineer (Civil/Structural) $300.00
Associate Engineer, Licensed $260.00
Project Manager $230.00
Staff Engineer $230.00
Field Supervision $230.00
ASNT Level III $280.00
Drafting $165.00
Quality Control Manager QOR

SPECIAL SERVICES
Portable and Mobile Laboratories, NDT and Soils QOR
* Epoxy Bolt/Expansion Anchor - Installation Observation $230.00 * Epoxy Bolt/Expansion Anchor Proof Load Testing (portal-to-portal) $230.00 * Coring, 1 Person (including equipment) (portal-to-portal) $305.00 * Coring, 2 Persons (including equipment) (portal-to-portal) $460.00 * Asphalt Coring (portal-to-portal) $330.00
Project Research QOR
Ultrasonic Testing for Non-Metallic Materials QOR
Pavement Rehabilitation Analysis Using Deflections QOR
Roof Moisture Survey QOR
Soil Drilling Equipment QOR
Geotechnical Site Investigations/Foundation Reports QOR Estimating Concrete Strength by the Maturity Method - Equipment Fee $125/kit ASTM C1074 QOR Gamma-Gamma Logging of CIDH Piles (Daily Rate) CT233 $3,500.00 FGIA/AAMA Window and Skylight Testing (Daily Rate) ASTM E1105, AAMA 501.2, 502 503 $3,500.00 Pachometer, Schmidt Hammer, Windsor Probe, Skidmore - Equipment Fee $115/Day (portal-to-portal) $305.00 Ultrasonic Pulse Velocity Testing - Equipment Fee $250/Day (portal-to-portal) ASTM C597 $650.00 Impact Echo Testing - Equipment Fee $250/Day (portal-to-portal) ASTM C1383 $305.00 Floor Flatness Testing FF/FL - Equipment Fee $115/Day (portal-to-portal) ASTM E1155 $305.00 Surface Frictional Properties Using Pendulum Tester - Equipment Fee $115/Day (portal-to-portal) ASTM E303 $305.00 Measuring Moisture Vapor Emission Rate (Calcium Chloride) - $55/Kit (portal-to-portal) ASTM F1869 $305.00 Relative Humidity Testing - $75/Kit (portal-to-portal) ASTM F2170 $305.00 Ferroscan - Equipment Fee $115/day (portal-to-portal) $305.00 GPR - Equipment Fee $115/day (portal-to-portal) $380.00 Administration, Secretarial, Special Projects, Notary, Certified Payroll $180.00 Concrete/Grout/Mortar Mix Design Review (less than 48 hours notice - $500) $355.00 Welding Procedure Review (less than 48 hours notice - $500) $355.00 Procedure Qualification Record (PQR) - Standard Procedure (document fee) $500.00 Welding Procedure Specification (WPS) - Standard Procedure (document fee) $500.00 Welder Qualification Test Record (WQTR) - Standard Procedure (document fee) $500.00 DSA Interim Reports $190.00
Geotechnical Pad Letter (less than 48 hours notice - $550) $355.00 Final Letter (less than 48 hours notice - $550) $355.00

EXPERT WITNESS TESTIMONY
Court appearance, per day $2,550.00
Court appearance, per half day $1,550.00
* Field inspection and laboratory technician services will be billed in accordance with minimums shown on Basis of Charges. **Professional engineering services will be billed in two hour increments. 2022 FEE SCHEDULE - P21218 3/8/2022

PERSONNEL FEES AND BASIS OF CHARGES

INSPECTIONS, ENGINEERING & SPECIAL SERVICES
inspecting
testing
engineering
All fees subject to Basis of Charges
DocuSign Envelope ID: FCFC00B2-D385-476C-B135-220A5E783022 C.4.g
Packet Pg. 324 Attachment: Construction Testing Services, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey inspecting
testing
engineering

GENERAL
MINIMUM HOURLY CHARGES – INSPECTION
Technician personnel and the following minimum charges are contractual commitment:

One-half day or less 4 Hours
Over one-half day 8 Hours
Show-up time (less than 2 hours notice = 4 hour charge) 2 Hours

WORKING HOURS AND PREMIUM TIME
Regular workday is the first 8 hours between 6:00 am and 6:00 pm Monday through Friday. Premium time is as follows:

Overtime, Weekdays and Saturdays (first 8 hours) 1.5 x quoted hourly rate Overtime Saturdays (over 8 hours) and Sundays (first 8 hours) 2 x quoted hourly rate Overtime Sundays (over 8 hours) and Holidays 3 x quoted hourly rate Shift differential, swing and graveyard -
(Work performed between 2:00 pm and 4:00 am) 12.5%/hour additional to base or quoted rate.

MISCELLANEOUS CHARGES - Only Where Applicable
Notary Services Fee $40.00/each
Facsimile Charges. Plus $1.00/page (n/c for cover page) $7.00/minimum Wireless Router/Data Card for Jobsite Internet $135.00/day iPad Monthly Rental Fee $100.00/month
Electronic Reporting Fees/Subscriptions (PlanGrid, BIM, etc.) At Cost Parking Fees At Cost
Air Travel Cost Plus 10%
Outside Services Cost Plus 20%
Subsistence (per Union contract) $130.00/day
Subsistence Premium: Meal Allowance (over 100 miles one way) (per Union contract) $30.00/day Subsistence Premium: Meal Allowance (over 150 miles one way) (per Union contract) $85.00/day Mileage Standard Federal Rate
Sample Pickup $30.00/each
Sample Pickup Trip Charge QOR
Weekend Sample Pickup $110.00/each
Project Administration 15% of Monthly Invoice
Samples Made by Others: Concrete Cylinders $130 + Test
Samples Made by Others: All Other Tests $55.00 + Test
Laboratory Sample Witness Fee $130.00
Laboratory Sample Storage Fee (per sample) $120.00
EZ Cure Boxes (Thermostatically Controlled Curing Boxes) QOR Returned Check Fee $150.00
Additional Sample Retention QOR
TESTS

INSURANCE

PAYMENT
Testing fees shown include normal time for performing test. Samples requiring special preparation will be charged at the laboratory technician rate. Fees for tests not listed will be quoted upon request. There will be a minimum charge of $100.00 for any engineering report. Please note some tests maybe tested by subconsultants. Samples delivered to the laboratory after 3:00pm or samples needing results within 24 hours will incur a 50% mark-up.

The liability of Construction Testing Services (CTS) is limited to CTS's contract value.

Invoices will be submitted monthly or bimonthly for services performed during the preceding month and are payable on receipt. Interest of 1.5% per month (but not exceeding the maximum rate allowable by law) will be payable on any amounts not paid within 30 days, payment thereafter to be applied first to accrued interest and then to the principle unpaid amount. Attorney’s fees or other costs incurred in collecting any delinquent amount shall be paid by client. Visa, MasterCard and American Express payments are accepted however fees will apply. Visa and MasterCard payments require an additional 3% on top of the amount of the invoice being paid. American Express payments require an additional 4% on top of the amount of the invoice being paid.

Fees for tests and inspection include cost of technician, normal equipment and regular reports. Engineering services will be charged at applicable rates and will require travel and mileage charges for equipment transport and storage per code (portal to portal) from the nearest CTS laboratory. Soils testing with nuclear gauge and/or sand cone equipment and inspections requiring equipment will require applicable travel and mileage charges for equipment transport and storage per code (portal-to-portal) from the nearest CTS laboratory. Fees for special projects, services overseas, or elsewhere in the United States, will be quoted on request. With prior notification to Client; charges are subject to change at any time. Construction Testing Services reserves the right to adjust the rates quoted in this contract based upon any Union or prevailing wage increases and/or changes in any industry requirements.

BASIS OF CHARGES
All fees subject to Basis of Charges
DocuSign Envelope ID: FCFC00B2-D385-476C-B135-220A5E783022 C.4.g
Packet Pg. 325 Attachment: Construction Testing Services, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey inspecting
testing
engineering
Standard
CONCRETE Rate/Each
Compressive Strength of Cylindrical Concrete Specimens (6x12) ASTM C39 and CT521 $90.00 Compressive Strength of Cylindrical Concrete Specimens (4x8) ASTM C39 and CT521 $90.00 Compressive Strength of Cylindrical Concrete Specimens (Over 8000 PSI) ASTM C39 and CT521 $165.00 Cylinder molds. 6” x 12” and 4" x 8" ASTM C470 $85.00
Compressive Strength of Lightweight Insulating Concrete ASTM C495 $105.00 Compressive Strength of Cylindrical Concrete Core and Sawed Beam Specimens ASTM C42 $140.00 Flexural Toughness of Fiber Reinforced Concrete (Round Panel) ASTM C1550 $550.00 Flexural Strength of Concrete (Using Simple Beam with Third-Point Loading) ASTM C78 $350.00 Flexural Strength of Concrete (Using Simple Beam with Third-Point Loading) CT523 and CT524 $350.00 Length Change of Hardened Hydraulic-Cement Mortar and Concrete (Shrinkage, 1 Sample) ASTM C157 $175.00 Shotcrete Nozzleman Qualification Letter (Per Nozzleman, Per Position) ACI 506, ASTM C42 and C1140 $500.00 Shotcrete Pre-Qualification Cores (Compression and Visual) ACI 506, ASTM C42 and C1140 $125.00 Shotcrete Production Cores ASTM C1140 $125.00
Coefficient of Thermal Expansion AASHTO T336 $575.00
Determining Density of Structural Lightweight Concrete (Cylinders) ASTM C567 $450.00 Standard Specification for Concrete Made by Volumetric Batching and Mixing ASTM C685 $1,000.00 Cement Quality Sampling CBC 2010 $700.00
Physical Testing of Gypsum, Gypsum Plasters and Gypsum Concrete ASTM C472 $65.00 Splitting Tensile Strength of Cylindrical Concrete Specimens ASTM C496 $270.00 Static Modulus of Elasticity and Poisson's Ratio of Concrete in Compression ASTM C469 $250.00 Grab Sample, Sealing and Storing in a Humidity and Temperature Controlled Room CBC $160.00 Density of Hydraulic Cement ASTM C188 $220.00
Testing of Controlled Low Strength Material (CLSM) Test Cylinders ASTM D4832 $175.00 GFRC Pull Test PCI $440.00
GFRC Flexural Test PCI $440.00
Foaming Agents for Use in Producing Cellular Concrete Using Preformed Foam (Cell-Crete) ASTM C796 $600.00

MASONRY
Compressive Testing of Grout (Masonry) ASTM C1019 $135.00 Compressive Strength of Hydraulic Cement Mortars Using 2" Cube Specimens ASTM C109 $135.00 Compressive Strength of Masonry Prisms ASTM C1314 $210.00 Testing Concrete Masonry Units and Related Units (Core Compression) CBC 2105A.4 $210.00 Compressive Strength of Molded Masonry Mortar Cylinders and Cubes (2" Sample) ASTM C780 A7.6 $135.00 Testing Concrete Masonry Units (CMU) and Related Units (Full Unit) ASTM C140 $210.00 Linear Drying Shrinkage of Concrete Masonry Units (Per Unit) ASTM C426 $315.00 Masonry Core Shear Testing CBC 2105A.4 $315.00
Testing Concrete Masonry Units (Absorption, Moisture Content, Unit Weight) ASTM C140 $390.00 Brick and Clay Tile (modulus of rupture, compression, saturation coefficient, suction rate, efflorescence)* ASTM C67 $1,050.00
Mortar Molds. 2” x 4”. Single Use $135.00
Mortar or Grout, Stored and Cured, Not Tested (Including Mold) $135.00 Veneer Bond Testing, does not include sample fabrication (Set of 5) ASTM C482 $525.00

AGGREGATES (CONCRETE AND SOILS)
Sieve Analysis of Coarse Aggregates (Coarse Only 2" - No.4)(sample size over 2" QOR) ASTM C136, CT202, and AASHTO T-27 $245.00 Sieve Analysis of Fine Aggregates (Fine Only, Wash Included No.4 - No.200) ASTM C136/C117, CT202, and AASHTO
T-27/AASHTO T-11 $315.00
Sieve Analysis of Combined Fine and Coarse Aggregates (Wash Included 2" - No.200) (sample size over 2" QOR)
ASTM C136/C117, CT202, and AASHTO
T-27/AASHTO T-11 $400.00
Materials Finer Than 75-µm (No. 200) Sieve in Mineral Aggregates by Washing (200 Wash) ASTM C117, CT202, and AASHTO T-11 $245.00 Evaluating Cleanness of Coarse Aggregate CT227 $400.00
Soundness of Aggregates by Use of Sodium Sulfate or Magnesium Sulfate ASTM C88, CT214, and AASHTO T-104 $325.00 Bulk Density/Unit Weight of Aggregate ASTM C29, CT212, and AASHTO T-19 $225.00 Clay Lumps and Friable Particles in Aggregates ASTM C142 and AASHTO T-19 $250.00 Flat Particles, Elongated Particles or Flat and Elongated Particles in Coarse Aggregate ASTM D4791 and CT235 $415.00 Organic Impurities in Fine Aggregates for Concrete ASTM C40 and CT213 $415.00 Density, Relative Density(Specific Gravity), and Absorption of Coarse Aggregate ASTM C127, CT206, and AASHTO T-85 $415.00 Density, Relative Density(Specific Gravity), and Absorption of Fine Aggregate ASTM C128, CT207, and AASHTO T-84 $415.00 Resistance to Degradation of Small Size Coarse Aggregate by Abrasion and Impact in the Los Angeles Machine ASTM C131, C211, and AASHTO T-96 $565.00 Resistance to Degradation of Large Size Coarse Aggregate by Abrasion and Impact in the Los Angeles Machine ASTM C535 $565.00
Percentage of Crushed Particles/Standard Test Method for Determining the Percentage of Fractured Particles in Coarse Aggregate ASTM D5821, CT205, and AASHTO T-335 $450.00 Uncompacted Void Content of Fine Aggregate (as Influenced by Particle Shape, Surface Texture, and Grading) ASTM C1252, CT234, and AASHTO T304A $450.00
Sand Equivalent Value of Soils and Fine Aggregate ASTM D2419, CT217, and AASHTO T-176 $315.00 Durability Index (Fine) ASTM D3744, CT229, AASHTO T-210 $450.00 Durability Index (Coarse) ASTM D3744, CT229, AASHTO T-210 $450.00 Durability Index (Fine and Coarse) ASTM D3744, CT229, AASHTO T-210 $450.00 Lightweight Particles in Aggregate ASTM C123 and AASHTO T113 QOR Resistance of Rock to Wetting and Drying CRD-C169 $625.00 Aggregate Moisture Content ASTM C566 $625.00
*Unusual sample preparation for brick specimen will be charged at the established hourly rate.

CONCRETE AND MASONRY TESTS
All fees subject to Basis of Charges
DocuSign Envelope ID: FCFC00B2-D385-476C-B135-220A5E783022 C.4.g
Packet Pg. 326 Attachment: Construction Testing Services, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey inspecting
testing
engineering
Standard
SOILS Rate/Each
Moisture Content of Soil by Oven ASTM D2216, CT226, and AASHTO T-265 $170.00 Moisture Content of Soil by Microwave Oven ASTM D4643 $225.00 Density of Soil in Place by the Drive-Cylinder Method including Moisture Content of Soil by Oven D2937 $255.00 Remold of Soil Samples Varies $150.00
Hydraulic Conductivity of Saturated Porous Materials Using a Flexible Wall Permeameter (Permeability) ASTM D5084 $600.00
Permeability Additional Cell Time $600.00
Direct Shear Test of Soils Under Consolidated Drained Conditions (per point) ASTM D3080 $600.00 Consolidated Undrained Triaxial Compression Test for Cohesive Soils (three points) ASTM D4767 $1,100.00 Consolidated Undrained Triaxial Compression Test for Cohesive Soils (added points) ASTM D4767 $375.00 Consolidated Undrained Triaxial Compression Test for Cohesive Soils (single point) ASTM D4767 $375.00 Consolidated Undrained Triaxial Compression Test for Cohesive Soils (includes 3 points)(includes Pore Pressures) ASTM D4767 $1,950.00
Consolidated Undrained Triaxial Compression Test for Cohesive Soils (added points)(includes Pore Pressures) ASTM D4767 $650.00
Consolidated Undrained Triaxial Compression Test for Cohesive Soils (single point)(includes Pore Pressures) ASTM D4767 $650.00
Unconsolidated Undrained Triaxial Compression Test for Cohesive Soils (per point) ASTM D2850 $185.00 Unconsolidated Undrained Triaxial Compression Test for Cohesive Soils with added backpressure saturation (per point) ASTM D2850 $315.00
One-Dimensional Consolidation Properties of Soils Using Incremental Loading ASTM D2435 $575.00 Unconfined Compressive Strength of Cohesive Soil ASTM D2166 and CT221 $225.00 Compressive Strength of Molded Soil-Cement Cylinders ASTM D1633 $300.00 Particle-Size Analysis of Soils (with Hydrometer) ASTM D422 $660.00 Particle-Size Analysis of Soils (without Hydrometer) ASTM D422 $600.00 Particle-Size Distribution of Fine Grained Soils using Sedimentation Analysis ASTM D7928 and ASTM D422 $600.00 Particle-Size Distribution (Gradation) of Soils Using Sieve Analysis (2" - No.200) (sample size over 2" QOR) ASTM D6913 $385.00
Material Finer than No.200 by Washing (200 Wash) ASTM D1140 $235.00 Liquid Limit, Plastic Limit, and Plasticity Index of Soils ASTM D4318 and CT204 $600.00 Determination of Organic Soils Classification using Liquid Limit of Soils ASTM D4318/D2487 $775.00 Organic Content of Soils and Peat ASTM D2974 $330.00
Unified Soil Classification System (USCS) Test ASTM D2487 $350.00 Moisture-Density Relations of Soil Using Modified Effort (Modified Proctor) ASTM D1557 $350.00 Moisture-Density Relations of Soil Using Standard Effort (Standard Proctor) ASTM D698 $525.00 Moisture-Density Relations of Soil Using Modified DWR Method DWR Modified $525.00 Moisture-Density Relations of Soil Using Rapid Compaction Method ASTM D5080 $525.00 Moisture-Density Relations of Soil-Cement Mixtures ASTM D558 $525.00 Moisture-Density Relations of Soil, 1 Point Check Point ASTM D698 $400.00 Moisture-Density Relations of Soil, 2 Point Check Point ASTM D698 $450.00 Moisture-Density Relations of Soil, 3 Point Check Point ASTM D698 $525.00 Moisture-Density Relations of Soil, 1 Point Check Point ASTM D1557 $350.00 Moisture-Density Relations of Soil, 2 Point Check Point ASTM D1557 $450.00 Moisture-Density Relations of Soil, 3 Point Check Point ASTM D1557 $525.00 Maximum Index Density and Unit Weight of Soils Using a Vibratory Table ASTM D4253 $550.00 Minimum Index Density and Unit Weight of Soils and Calculation of Relative Density ASTM D4254 $330.00 Maximum Dry Unit Weight of Granular Soils Using a Vibrating Hammer ASTM D7382 $500.00 Relative Compaction of Untreated and Treated Soils and Aggregates CT216 $600.00 Determining the Resistance "R" Value of Treated and Untreated Bases, Subbases, and Basement Soils by the Stabiliometer ASTM D2844 and CT301 $650.00 Expansion Index of Soils ASTM D4829 $500.00
Standard Test Methods for Specific Gravity of Soil Solids by Water Pycnometer ASTM D854 $400.00 pH of Soils ASTM D4972 $550.00
Density of Hydraulic Cement ASTM C188 $375.00
Volatile Organic Content EPA 8260B QOR
Semi Volatile Organics by GC/Ms (Basic Target List) EPA 8270C QOR Total Organic Carbon ASTM 2974/EPA 5310Bm QOR
ICP Metals Concentration EPA 6020 - CAM/CCR 17 QOR
Total Extractable Petroleum Hydrocarbons: TPH, MTBE, Benzene,Toluene, Ethylbenzene, Zylenes, %SS EPA 8015B QOR
ICP Metals Concentration EPA 6020 QOR
pH EPA 9045D $600.00
Sequential Batch Extraction of Waste with Acidic Extraction Fluid ASTM D5284 QOR Chromium Soluble EPA 7196A QOR
Caltrans Corrosivity Package $575.00
Determining Field and Laboratory Resistivity and pH Measurements for Soil and Water CT643 QOR Soils and Waters for Sulfate Content CT417 QOR
Soils and Waters for Chloride Content CT422 QOR
Pore Water Extraction and Determination of the Soluble Salt Content of Soils by Refractometer ASTM D4542 $700.00 California Bearing Ratio Test (does not include moisture density relations) ASTM D1883 $400.00 Bentonite Slurry Testing QOR
** Does not include sample preparation or sieve analysis * Unusual sample preparation (dried clays, saturated clays, etc.) and all other tests for treated or untreated soils, aggregate subbase and aggregate base will be charged at established rates for laboratory technician.

SOILS AND AGGREGATE SERVICES AND TESTS
All fees subject to Basis of Charges
DocuSign Envelope ID: FCFC00B2-D385-476C-B135-220A5E783022 C.4.g
Packet Pg. 327 Attachment: Construction Testing Services, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey inspecting
testing
engineering
Standard
ASPHALT Rate/Each
Thickness/Height of Compacted Bituminous Paving Mixture Specimens Field Cores ASTM D3549 and CT308 $200.00 Bulk Specific Gravity of Compacted Bituminous Mixture (Individual field cores or lab compacted) ASTM D1188, ASTM D2726, CT308, $315.00 Lab Compaction Only of Bituminous Mixture by Marshall Apparatus (Marshall) (Per Specimen) ASTM D6926 $315.00 Lab Compaction Only of Bituminous Mixture by CA Kneading Compactor (HVEEM) (Per Specimen) ASTM D1561, CT304, and AASHTO T-247 $315.00 Lab Compaction Only of Bituminous Mixture by Superpave Gyratory (Superpave) (Per Specimen) ASTM D6925, and AASHTO T-312 $315.00 Laboratory Test Max Density (LTMD) (5 Specimen, includes compaction of specimen and bulk specific ASTM D1561/(D1188 and D2726) and $1,150.00 Superpave Bulk specific gravity (includes gyratory compaction of 3 specimen and bulk specific gravity) AASHTO T-312/T-275/T-166 $1,150.00 Marshal Lab Compacted Max Density (3 Specimen, includes compaction of specimen and bulk specific ASTM D6926/(D1188 and D2726) $1,150.00 Theoretical Maximum Specific Gravity and Density (Rice) ASTM D2041, CT309, and AASHTO T-209 $500.00 Marshall Stability and Flow of Bituminous Mixtures (average Set of 3, includes sample compaction) ASTM D6926/ASTM D6927 $1,150.00 Measuring the Permeability of Bituminous Pavements and Seal Coats CT341 QOR Swell of Bituminous Mixtures CT305 $440.00
Moisture Vapor Susceptibility of Bituminous Mixtures/Moisture or Volatile Distillates in Asphalt ASTM D1461 and CT307 $1,000.00 Stabilometer Value of field compacted cores (Per Specimen) ASTM D1560, CT366, and AASHTO T-246 $445.00 Stabilometer Value of Lab compacted samples (Average of 3 Specimen, Includes Sample ASTM D1561/D1560, CT304/CT366, and $1,150.00 Determination of Asphalt Content of Bituminous Paving Mixtures by the Ignition Method ASTM D6307, CT382, and AASHTO T-308 $450.00 Determination of Correction Factor of Bituminous Paving Mixtures by the Ignition Method ASTM D6307, CT382, and AASHTO T-308 $450.00 Quantitative Extraction of Bitumen from Bituminous Paving Mixtures (Solvent) ASTM D2172 and CT310 $800.00 Mechanical Size Analysis (Coarse and Fine) of Extracted Aggregate (Afterburn Gradation) ASTM D5444, CT202, and AASHTO T-30 $450.00 Moisture Content of Bituminous Mixture CT370 and AASHTO T-329 $475.00 Effect of Water on Compressive Strength of Compacted Bituminous Mixtures (Set of 6) ASTM D1075 $3,700.00 Compressive Strength of Bituminous Mixtures ASTM D1074 $350.00 Hamburg Wheel Track (includes compaction by gyratory)(includes 2 runs) AASHTO T324 $4,000.00 Tensile Strength Ratio (TSR) Moisture Susceptibility (includes compaction of 6 Specimen ASTM D4867 and AASHTO T-283 $4,000.00 Tensile Strength Ratio (TSR) Moisture Susceptibility (includes compaction of 12 Specimen) CT371 $6,000.00 Indirect Tensile (IDT) Strength of Bituminous Mixtures ASTM D6931 $3,750.00 Air Voids Calculation of Compacted Bituminous Mixture ASTM D3203, CT367, and AASHTO T-269 $215.00 PG Verification (Determining Low Temperature Performance Grade (PG) of Asphalt Binders) ASTM 6816 QOR

MATERIALS MECHANICAL TESTS
Mechanical Testing of Steel Products (General Tensile) ASTM A370 $550.00 Fillet Weld Break Test for Qualification (Welding) AWS B4.0 $250.00 Tension Testing of Metallic Materials, Tension Testing Wrought and Cast Aluminum and Magnesium- ASTM E8, B557 and AWS B4.0 $550.00 Mechanical Testing of Steel Products (Couplers) ASTM A370 $550.00 Impact Testing of Miniaturized Charpy V-Notch Specimens, Notched Bar Impact Testing of Metallic ASTM E2248 and ASTM E23 QOR Testing, Practices, and Terminology for Chemical Analysis of Steel Products ASTM A751 $375.00 Mechanical Testing of Steel Products & Bend Testing of Material for Ductility; #3-#8 ASTM A370 and E290 $440.00 Mechanical Testing of Steel Products & Bend Testing of Material for Ductility; #9-#11 ASTM A370 and E290 $500.00 Mechanical Testing of Steel Products & Bend Testing of Material for Ductility; #14+ ASTM A370 and E290 QOR Mechanical Testing of Steel Products, Standard Specification for Steel Wire, Plain, for Concrete ASTM A370, A82 and A185 $500.00 Guided Bend Test for Ductility of Welds, Mechanical Testing of Welds ASTM E190 and AWS B4.0 $350.00 Determining the Mechanical Properties of Externally and Internally Threaded Fasteners, Anchor Bolts ASTM F307, F1554 and F606 $600.00 Rockwell Hardness of Metallic Materials ASTM E18 $185.00 Proof Test for Carbon and Alloy Steel (Nuts Only) ASTM A194 or A563 $375.00 Radiographic Examination of Metallic Castings/Weldments ASTM E94, E1030 and E1032 QOR Macroetching Metals and Alloys ASTM E340, E381 and AWS $375.00 Determining the Mechanical Properties of Externally and Internally Threaded Fasteners, Washers, ASTM F606 $425.00 Mechanical Testing of Steel Products (Terminators Tensile) ASTM A370 $425.00 Strength for Sewn or Bonded Seams of Geotextiles ASTM D4884 $375.00 Tearing Strength of Fabrics by the Tongue (Single Rip) Procedure ASTM D2261 $375.00 Breaking Strength and Elongation of Textile Fabrics (Grab Test) ASTM D5034 $325.00 Tensile Properties of Fiber Reinforced Polymer Matrix Composite Bars ASTM D3039 $1,050.00 Steel Strand, Uncoated Seven-Wire for Prestressed Concrete (Set of 2) ASTM A416 and A1061 $1,600.00

FIREPROOFING
Thickness and Density of Sprayed Fire-Resistive Material (SFRM) ASTM E605 $295.00 Cohesion/Adhesion of Sprayed Fire-Resistive Materials (Test Kit Only) ASTM E736 $85.00

CONTACT INFORMATION
Headquarters: 2118 Rheem Drive • Pleasanton, CA 94588 • P 925.462.5151 • F 925.462.5183 Peninsula: 44 Tehama, Suite 305 • San Francisco, CA 94105 • P 415.334.4747 • F 415.438.2357 Oakland: 246 30th Street, Suite 101 • Oakland, CA 94601 • P 510.444.4747 • F 510.835.1825 Stockton: 343 East Main Street, #711 • Stockton, CA 95202 • P 209.507.7555 • F 209.507.7554 Rocklin: 4400 Yankee Hill Road • Rocklin, CA 95677 • P 916.419.4747 • F 916.419.4774 Las Vegas: 3842 E. Post Road • Las Vegas, NV 89120 • P 702.257.4747 • F 702.257.4718

ASPHALTIC CONCRETE SERVICES AND TESTS

MECHANICAL TESTS AND FIREPROOFING
San Jose: 2033 Gateway Place, #500 • San Jose, CA 95110 • P 408.573.6992 • F 408.437.1201 All fees subject to Basis of Charges
DocuSign Envelope ID: FCFC00B2-D385-476C-B135-220A5E783022 C.4.g
Packet Pg. 328 Attachment: Construction Testing Services, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey 1 PSA_City Attorney Approved Version 040821

AGREEMENT FOR ON-CALL GEOTECHNICAL/CONSTRUCTION MATERIALS TESTING SERVICES Geocon Consultants, Inc.

THIS AGREEMENT is made and entered into as of the _____ day of __________________, 2022 by and between the City of Brentwood, a municipal corporation of the State of California ("City"), and Geocon Consultants, Inc., an S Corporation ("Consultant") (each a “Party” and collectively, the “Parties”).

RECITALS
A. City requires the professional services of a consultant specifically trained and experienced in geotechnical/construction materials testing services, which are professional services outside of services offered by City.

B. Consultant has the professional skills and experience necessary to perform the services described in this Agreement.

C. Consultant customarily engages in these services as part of its independently established trade, occupation, and/or business, separately from its work for City.

D. City desires to engage Consultant to provide these services by reason of its qualifications and experience in performing such services
E. Consultant has submitted a proposal to City and has affirmed its willingness and ability to perform such work on the terms and manner set forth in this Agreement.

NOW, THEREFORE, in consideration of these recitals and the mutual covenants contained herein, the Parties agree as follows:

1. Scope of Work.

1.1 City retains Consultant, as an independent contractor, to perform, and Consultant agrees to render, those services (the "Services") that are described in the attached Exhibit "A," which is incorporated by this reference, pursuant to this Agreement’s terms and conditions.

1.2 Consultant will control the manner and the means of the work to be performed, and be responsible for the professional quality, technical accuracy and coordination of the Services. Consultant will, without additional compensation, correct or revise any errors or deficiencies in the Services.

1.3. Consultant will keep City informed on a regular basis that the Services are being performed in accordance with the requirement and intentions of this Agreement.

1.4 If applicable, Consultant has designated those persons listed in Exhibit “A” to provide the Services to the City. Consultant will not change or reassign those persons described in Exhibit “A” without prior written notice to City, and will not replace those individuals with individuals to whom City has a reasonable objection.

2. Standard of Performance. Consultant acknowledges that in entering into this Agreement the City is relying on Consultant's special skills and experience to do and perform the Services. While performing the Services, Consultant will exercise the reasonable professional care and skill customarily exercised by reputable members of Consultant's profession practicing in the Northern California area. The acceptance of the Services by City does not release Consultant from these obligations.

Consultant will be responsible for employing or engaging all persons necessary to perform the Services.

Consultant will control the manner and means of the services to be performed by its employees and subconsultants. All of Consultant's staff will be qualified by training and experience to perform their assigned tasks. Consultant will give its personal attention to the fulfillment of the provisions of this DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 329 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey 2 PSA_City Attorney Approved Version 040821
Agreement by all of its employees and subcontractors, if any, and will keep the Services under its control.

On demand of City, if any employee or subcontractor of Consultant fails or refuses to carry out the provisions of this Agreement or appears to be incompetent or to act in a disorderly or improper manner, he or she will be discharged immediately from the Services.

3. Term. Unless earlier terminated, the term of this Agreement will be effective for a period of one year from the date first above written. The City Manager may amend the Agreement to extend it for two additional one-year periods or parts thereof in an amount not to exceed one hundred thousand dollars ($100,000) per Agreement year. Extensions will be based upon a satisfactory review of Consultant's performance, City needs, and appropriation of funds by the City Council. The parties will prepare a written amendment indicating the effective date and length of the extended Agreement.

4. Schedule. Consultant will generally adhere to the schedule set forth in Exhibit “A” provided, that City will grant reasonable extensions of time for the performance of the Services occasioned by unusually lengthy governmental reviews of Consultant’s work product or other unavoidable delays occasioned by unforeseen circumstances; provided, further, that such unavoidable delay will not include strikes, lockouts, work stoppages, or other labor disturbances conducted by, or on behalf of, Consultant’s officers or employees.

Consultant acknowledges the importance to City of City’s project schedule and agrees to put forth its best professional efforts to perform the Services in a manner consistent with that schedule. City understands, however, that Consultant’s performance must be governed by sound practices. Consultant will work such overtime or engage such personnel and equipment as necessary to maintain the schedule, without additional compensation.

5. Compensation.

5.1 The total fee payable for the Services to be performed during the term of this Agreement will be a not to exceed amount of one hundred thousand dollars ($100,000) as may be further specified in the attached Exhibit “A.” No other compensation for the Services will be allowed except for items covered by subsequent amendments to this Agreement. The City reserves the right to withhold a ten percent (10%) retention until City has accepted the Services.

5.2 Payment will occur only after receipt by City of invoices sufficiently detailed to include hours performed, hourly rates, and related activities and costs for approval by City.

5.3 Within thirty (30) days after receipt of any applicable progress payment request, City will verify the accuracy of the request, correct the charges where appropriate, and make payment to Consultant in an amount equal to the amount of such application, as verified or corrected by City. No payment made prior to completion and acceptance of the Services will constitute acceptance of any part of the Services.

City reserves the right to withhold payment from Consultant on account of Services not performed satisfactorily, delays in Consultant's performance of Services, or other defaults hereunder.

6. Status of Consultant. Consultant will perform the Services as an independent contractor, free from the control and direction of City, in pursuit of Consultant’s independent calling, and not as an employee of City. The persons used by Consultant to provide the Services under this Agreement will not be considered employees of City for any purposes whatsoever and City will not pay any tax, workers’ compensation insurance, retirement contributions or unemployment contributions on behalf of Consultant or its employees or subcontractors. Consultant agrees to indemnify and pay City within thirty (30) days for any tax, retirement contribution, social security, overtime payment, unemployment payment or workers’ compensation payment, including, but not limited to, those based on any provision of the Federal Affordable Care Act, which City may be required to make on behalf of Consultant or any agent, employee, or contractor of Consultant for work done under this Agreement. The payment made to Consultant pursuant to the Agreement will be the full and complete compensation to which Consultant is entitled. City will not make any federal or state tax withholdings on behalf of Consultant or its agents, employees or subcontractors.

DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 330 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey 3 PSA_City Attorney Approved Version 040821
At the City’s election, City may deduct the amounts paid pursuant to this Section, from any balance owing to Consultant.

7. Subcontracting. Consultant's services are being requested by City because they are unique and personal. Except as may be specified in Exhibit “A”, Consultant will not subcontract any portion of the Services without prior written approval of City Manager or his/her designee. If Consultant subcontracts any of the Services, Consultant will be fully responsible to City for the acts, errors and omissions of Consultant's subcontractor and of the persons either directly or indirectly employed by the subcontractor, as Consultant is for the acts and omissions of persons directly employed by Consultant. Nothing contained in this Agreement will create any contractual relationship between any subcontractor of Consultant and City.

Consultant will be responsible for payment of subcontractors. Consultant will bind every subcontractor and every subcontractor of a subcontractor by the terms of this Agreement applicable to Consultant's work unless specifically noted to the contrary in the subcontract and approved in writing by City.

8. Other Consultants. The City reserves the right to employ other consultants in connection with the Services.

9. Indemnification. Consultant agrees to indemnify, including the cost to defend, City, its officers, agents, volunteers and employees from any and all claims, demands, costs or liability that arise out of, or pertain to, or relate to the negligence, recklessness, or willful misconduct of Consultant and its agents in the performance of services under this Agreement, but this indemnity does not apply to liability for damages for death or bodily injury to persons, injury to property, or other loss, arising from the sole negligence, willful misconduct or defects in design by City or the agents, servants, or independent contractors who are directly responsible to City, or arising from the active negligence of City.

10. Insurance. Consultant will obtain and maintain, at its cost and expense, for the duration of the Agreement and any and all amendments, insurance against claims for injuries to persons or damage to property which may arise out of or in connection with performance of the Services by Consultant or Consultant’s agents, representatives, employees or subcontractors. The insurance will be obtained from an insurance carrier admitted and authorized to do business in the State of California. The insurance carrier is required to have a current Best's Key Rating of not less than "A:VII."

10.1 Coverages and Limits. Consultant will maintain the types of coverages and minimum limits indicated below, unless Risk Manager or City Manager, in consultation with the City Attorney approves a lower amount. These minimum amounts of coverage will not constitute any limitations or cap on Consultant's indemnification obligations under this Agreement. City, its officers, agents, volunteers and employees make no representation that the limits of the insurance specified to be carried by Consultant pursuant to this Agreement are adequate to protect Consultant. The coverage will contain no special limitations on the scope of its protection to the above-designated insureds except for Workers Compensation and errors and omissions insurance. Consultant will obtain occurrence coverage, excluding Professional Liability, which will be written as claims-made coverage. If Consultant believes that any required insurance coverage is inadequate, Consultant will obtain such additional insurance coverage, as Consultant deems adequate, at Consultant's sole expense.

10.1.1 Commercial General Liability Insurance. $2,000,000 combined single-limit per occurrence for bodily injury, personal injury and property damage. If the submitted policies contain aggregate limits, general aggregate limits will apply separately to the work under this Agreement or the general aggregate will be twice the required per occurrence limit.

10.1.2 Automobile Liability. $1,000,000 combined single-limit per accident for bodily injury and property damage.

10.1.3 Workers' Compensation and Employer's Liability. Workers' Compensation limits as required by the California Labor Code and Employer's Liability limits of $1,000,000 per accident for bodily injury. Workers' Compensation and Employer's Liability insurance will not be required if Consultant has no employees and provides, to City's satisfaction, a declaration stating this.

DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 331 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey 4 PSA_City Attorney Approved Version 040821

10.1.4 Professional Liability. Errors and omissions liability appropriate to Consultant’s profession with limits of not less than $1,000,000 per claim.

10.2 Endorsements. For Commercial General Liability Insurance, Consultant will ensure that the policies are endorsed to name the City, its officers, agents, volunteers and employees as additional insureds. Prior to City's execution of this Agreement, Consultant will furnish, to the satisfaction of the City, certificates of insurance and endorsements.

10.3 Cancellation. Insurance will be in force during the life of the Agreement and any extensions of it and will not be canceled without thirty (30) days prior written notice to City sent pursuant to the notice provisions of this Agreement.

10.4 Failure to Maintain Coverage. If Consultant fails to maintain any of these insurance coverages, then City will have the option to declare Consultant in breach of this Agreement, or may purchase replacement insurance or pay the premiums that are due on existing policies in order to maintain the required coverages. Consultant is responsible for any payments made by City to obtain or maintain insurance and City may collect these payments from Consultant or deduct the amount paid from any sums due Consultant under this Agreement.

10.5 Submission of Insurance Policies. City reserves the right to require, at any time, complete and certified copies of any or all required insurance policies and endorsements.

10.6 Primary Coverage. For any claims related to the Services and this Agreement, the Consultant’s insurance coverage will be primary insurance with respect to City, its officers, agents, volunteers and employees. Any insurance or self-insurance maintained by City for itself, its officers, agents, volunteers and employees, will be in excess of Consultant’s insurance and not contributory with it.

10.7 Reduction in Coverage/Material Changes. Consultant will notify City in writing pursuant to the notice provisions of this Agreement thirty (30) days prior to any reduction in any of the insurance coverage required pursuant to this Agreement or any material changes to the respective insurance policies.

10.8 Waiver of Subrogation. The policies shall contain a waiver of subrogation for the benefit of City.

11. Business License. Consultant will obtain and maintain a City of Brentwood Business License for the term of the Agreement, as it may be amended from time-to-time.

12. Maintenance of Records. Consultant will maintain complete and accurate records with respect to costs incurred under this Agreement. All records will be clearly identifiable. Consultant will allow a representative of City during normal business hours to examine, audit, and make transcripts or copies of records and any other documents created pursuant to this Agreement. Consultant will allow inspection of all work, data, documents, proceedings, and activities related to the Agreement for a period of three (3) years from the date of final payment under this Agreement.

13. Ownership of Documents.

13.1 All product produced by Consultant or its agents, employees, and subcontractors pursuant to this Agreement (the “Work Product”) is the property of City. In the event this Agreement is terminated, all Work Product produced by Consultant or its agents, employees and subcontractors pursuant to this Agreement will be delivered to City pursuant to the termination clause of this Agreement. Consultant will have the right to make one (1) copy of the Work Product for Consultant’s records.

13.2 The Work Product may be used by City and its agents, employees, representatives, and assigns, in whole or in part, or in modified form, for all purposes City may deem advisable, without further employment of or payment of any compensation to Consultant; provided, however, that if this Agreement DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 332 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey 5 PSA_City Attorney Approved Version 040821
is terminated for any reason prior to completion of the Project and if under such circumstances City uses, or engages the services of and directs another consultant to use, the Work Product, City agrees to hold Consultant harmless from any and all liability, costs, and expenses relative to claims arising out of matters and/or events which occur subsequent to the termination of this Agreement as a result of causes other than the fault or negligence of Consultant, or anyone for whose acts it is responsible, in preparation of the Work Product. Consultant will not be responsible for deficiencies solely attributable to modifications of the Work Product performed by others, or that arise from use of the Documents in connection with a project or site other than that shown in the Work Product.

14. Copyrights. Consultant agrees that all copyrights that arise from the Services will be vested in City and Consultant relinquishes all claims to the copyrights in favor of City.

15. Confidentiality. All documents, reports, information, data, and exhibits prepared or assembled by Consultant in connection with the performance of the Services pursuant to the Agreement are confidential until released by the City to the public, and the Consultant will not make any of these documents or information available to any individual or organization not employed by the Consultant or the City without the written consent of the City before any such release.

16. Notices. Any notices relating to this Agreement shall be given in writing and shall be deemed sufficiently given and served for all purposes when delivered personally, by facsimile or by generally recognized overnight courier service, or five (5) days after deposit in the United States mail, certified or registered, return receipt requested, with postage prepaid, addressed as follows:

For City:

City of Brentwood
150 City Park Way
Brentwood, CA 94513
Phone No. (925) 516-5307
Attn: Jigar Shah
For Consultant:

Name: Geocon Consultants, Inc.

Title: Vice President
Address: 6671 Brisa Street
Livermore, CA 94550
Phone: (925) 371-5900
Attn: Shane Rodacker
Either Party may change its address for purposes of this section by giving the other Party written notice of the new address in the manner set forth above.

17. Conflicts of Interest.

17.1 City will evaluate Consultant’s duties pursuant to this Agreement to determine whether disclosure under the Political Reform Act and City’s Conflict of Interest Code is required of Consultant or any of Consultant’s employees, agents, or subcontractors. Should it be determined that disclosure is required, Consultant or Consultant’s affected employees, agents, or subcontractors will complete and file with the City Clerk those schedules specified by City and contained in the Statement of Economic Interests Form 700.

17.2 Consultant understands that its professional responsibility is solely to City. Consultant warrants that it presently has no interest, present or contemplated, and will not acquire any direct or indirect interest, that would conflict with its performance of this Agreement. Consultant further warrants that neither Consultant, nor Consultant’s agents, employees, subcontractors and consultants have any ancillary real property, business interests or income that will be affected by this Agreement or, alternatively, that Consultant will file with the City an affidavit disclosing this interest. Consultant will not knowingly, and will take reasonable steps to ensure that it does not, employ a person having such an interest in the performance of this Agreement. If after employment of a person, Consultant discovers that it has employed a person with a direct or indirect interest that would conflict with its performance of this Agreement, Consultant will promptly disclose the relationship to the City and take such action as the City may direct to remedy the conflict.

DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 333 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey 6 PSA_City Attorney Approved Version 040821

18. General Compliance with Laws. Consultant will keep fully informed of federal, state and local laws and ordinances and regulations which in any manner affect those employed by Consultant, or in any way affect the performance of the Services by Consultant. Consultant will at all times observe and comply with these laws, ordinances, and regulations and will be responsible for the compliance of the Services with all applicable laws, ordinances and regulations.

19. Pandemic Health Laws. Consultant’s duty to comply with Laws includes compliance by Consultant with all local, state, or federal Laws that have been or may be enacted in response to the COVID-19 pandemic (collectively, “Health Laws”), which include all of the County of Contra Costa Health Orders. Failure to fully comply with the Health Laws constitutes a material default, subject to all available remedies including suspension or termination.

20. Discrimination and Harassment Prohibited. Consultant will comply with all applicable local, state and federal laws and regulations prohibiting discrimination and harassment.

21. Termination. In the event of the Consultant's failure to prosecute, deliver, or perform the Services, City may terminate this Agreement for nonperformance by notifying Consultant in writing pursuant to the notice provisions of this Agreement. Consultant has five (5) business days to deliver any documents owned by City and all work in progress to City address contained in this Agreement. City will make a determination of fact based upon the work product delivered to City and of the percentage of work that Consultant has performed which is usable and of worth to City in having the Agreement completed. Based upon that finding City will determine the final payment of the Agreement. In the event City elects to terminate, City will have the right to immediate possession of all Work Product and work in progress prepared by Consultant, whether located at the project site, at Consultant's place of business, or at the offices of a subconsultant.

Either Party, upon tendering thirty (30) calendar days written notice to the other Party, may terminate this Agreement for convenience. In this event and upon request of City, Consultant will assemble the work product without charge and put it in order for proper filing and closing and deliver it to City. Consultant will be paid for work performed to the termination date; however, the total will not exceed the lump sum fee payable under this Agreement. City will make the final determination as to the portions of tasks completed and the compensation to be made.

22. Covenants Against Contingent Fees. Consultant warrants that Consultant has not employed or retained any company or person, other than a bona fide employee working for Consultant, to solicit or secure this Agreement, and that Consultant has not paid or agreed to pay any company or person, other than a bona fide employee, any fee, commission, percentage, brokerage fee, gift, or any other consideration contingent upon, or resulting from, the award or making of this Agreement. For breach or violation of this warranty, City will have the right to terminate this Agreement for nonperformance, or, in its discretion, to deduct from the Agreement price or consideration, or otherwise recover, the full amount of the fee, commission, percentage, brokerage fees, gift, or contingent fee.

23. Claims And Lawsuits. By signing this Agreement, Consultant agrees that any Agreement claim submitted to City must be asserted as part of the Agreement process as set forth in this Agreement and not in anticipation of litigation or in conjunction with litigation. Consultant acknowledges that if a false claim is submitted to City by Consultant, it may be considered fraud and Consultant may be subject to criminal prosecution. Consultant acknowledges that California Government Code sections 12650 et seq., the False Claims Act, applies to this Agreement and, provides for civil penalties where a person knowingly submits a false claim to a public entity. These provisions include false claims made with deliberate ignorance of the false information or in reckless disregard of the truth or falsity of information. If City seeks to recover penalties pursuant to the False Claims Act, it is entitled to recover its litigation costs, including attorney's fees. Consultant acknowledges that the filing of a false claim may subject Consultant to an administrative debarment proceeding as the result of which Consultant may be prevented to act as a Consultant on any public work or improvement for a period of up to five (5) years. Consultant acknowledges debarment by another jurisdiction is grounds for City to terminate this Agreement.

DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 334 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey 7 PSA_City Attorney Approved Version 040821

24. Jurisdiction, Venue and Governing Law. Any action at law or in equity brought by either of the Parties for the purpose of enforcing a right or rights provided for by this Agreement will be tried in a court of competent jurisdiction in the County of Contra Costa, State of California, and the Parties waive all provisions of law providing for a change of venue in these proceedings to any other county. This agreement will be governed by the laws of the State of California.

25. Testimony. Consultant will testify at City's request if litigation is brought against City in connection with Consultant's services under this agreement. Unless the action is brought by Consultant, or is based upon Consultant's actual or alleged negligence or other wrongdoing, City, upon prior written agreement with Consultant will compensate Consultant for time spent in preparation for testimony, testimony, and travel at Consultant's standard hourly rates at the time of actual testimony.

26. Successors and Assigns. It is mutually understood and agreed that this Agreement will be binding upon the Parties and their respective successors. Neither this Agreement nor any part of it nor any monies due or to become due under it may be assigned by Consultant without the prior written consent of City, which will not be unreasonably withheld.

27. Section Headings. Section headings as used in this Agreement are for convenience only and will not be deemed to be a part of such sections and will not be construed to change the meaning of the section.

28. Waivers. The waiver by either Party of any breach or violation of any term, covenant, or condition of this Agreement or of any applicable law will not be deemed to be a waiver of such term, covenant, condition or law or of any subsequent breach or violation of same or of any other term, covenant, condition or law. The acceptance by either Party of any fee or other payment which may become due under this Agreement will not be deemed to be a waiver of any preceding breach or violation by the other Party of any term, covenant, or condition of this Agreement or any applicable law.

29. Entire Agreement. This Agreement, together with any other written document referred to or contemplated by it embody the entire Agreement and understanding between the parties relating to the subject matter of it. The City Manager is authorized, in consultation with the City Attorney, to agree to nonmaterial amendments to this Agreement. Neither this Agreement nor any of its provisions may be amended, modified, waived or discharged except in a writing signed by both parties.

30. Authority. The individuals executing this Agreement and the instruments referenced in it on behalf of Consultant each represent and warrant that they have the legal power, right and actual authority to bind Consultant to the terms and conditions of this Agreement.

31. Severability. If any term, provision, condition or covenant of this Agreement or its application to any party or circumstances shall be held, to any extent, invalid or unenforceable, the remainder of this Agreement, or the application of the term, provision, condition or covenant to persons or circumstances other than those as to whom or which it is held invalid or unenforceable, shall not be affected, and shall be valid and enforceable to the fullest extent permitted by law.

DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 335 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey 8 PSA_City Attorney Approved Version 040821

32. Signatures.

32.1 Counterparts. This Agreement may be executed in two or more counterparts, each of which together will be deemed an original, but all of which together will constitute the same instrument.

32.2 Digital/Electronic Signatures. Using a City-approved method, this Agreement may be executed through the use of digital or electronic signatures in accordance with Government Code Section

16.5. The presence of an electronic signature on this Agreement will be construed as the Parties’ consent to do business electronically.

CONSULTANT:
* By:

Printed Name: Shane Rodacker
Title: Vice President
** By:

Printed Name: William Lydon
Title: CFO
CITY:

By:

Tim Y. Ogden, City Manager
ATTEST:

By:

Margaret Wimberly, City Clerk
APPROVED AS TO FORM:

By:

Damien Brower, City Attorney
If required by City, proper notarial acknowledgment of execution by Consultant must be attached. If a Corporation, Agreement must be signed by one corporate officer from each of the following two groups. *Group A. **Group B.

Chairman, Secretary,
President, or Assistant Secretary,
Vice-President CFO or Assistant Treasurer
Otherwise, the corporation must attach a resolution certified by the secretary or assistant secretary under corporate seal empowering the officer(s) signing to bind the corporation.

If an LLC:
• The Agreement must be signed by a Managing Member or the LLC must attach a resolution empowering the signatory to bind the LLC.

If a partnership:
• The Agreement must be signed by the Managing Partner or the Partner authorized to execute agreements of this type. Additional documentation, such as the partnership agreement, confirming this signature authority may be required.

If a sole proprietorship:
• The Agreement must be signed by the owner.

DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 336 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey 9 PSA_City Attorney Approved Version 040821
EXHIBIT “A”

SCOPE OF SERVICES
DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 337 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey

STATEMENT OF QUALIFICATIONS
Submitted by:

Geocon Consultants, Inc.
(925) 371-5900
6671 Brisa Street
Livermore, CA 94550
www.geoconinc.com
City of Brentwood
Public Works Department
Attention: Renee Payette
150 City Park Way
Brentwood, CA 94513
March 8, 2022

CITY OF BRENTWOOD GEOTECHNICAL/

CONSTRUCTION MATERIALS TESTING

DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 338 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey 6671 Brisa Street ■ Livermore, California 94550 ■ P| 925.371.5900 A. TRANSMITTAL LETTER Proposal No. LE-22-022
March 8, 2022
Renee Payette
City of Brentwood
Public Works Department
150 City Park Way
Brentwood, CA 94513
Subject: STATEMENT OF QUALIFICATIONS TO PERFORM GEOTECHNICAL/CONSTRUCTION MATERIALS

TESTING SERVICES FOR CITY OF BRENTWOOD INFRASTRUCTURE PROJECTS Dear Mr. Payette:

Geocon Consultants, Inc. (Geocon) is pleased to submit our statement of qualifications (SQO) to the City Brentwood to continue to perform materials testing and inspection services for future projects in the City of Brentwood (the City). As the incumbent geotechnical engineering and materials testing firm, Geocon has the experience, expertise, and qualified personnel necessary to provide the construction support that the City needs to complete their infrastructure projects. We are committed to performing the services as described in Request for Qualifications (RFQ) dated February 1, 2022 and to continuing to provide the City with exceptional and quality services in the most cost-effective manner.

Geocon is a client- and service-focused consulting firm specializing in public works materials testing, construction inspection, and geotechnical and environmental engineering services. We have 50 years of experience providing these services to agencies throughout the State of California, and we have assembled a dedicated team of technical professionals to apply our extensive expertise and provide responsive and efficient materials testing services to the City.

We will dispatch and manage all services from our Bay Area office located in Livermore, CA. Mr. Shane Rodacker, GE, will be the main point of contact for the City during the proposal stage and will continue as the contract manager once a contract is awarded. Mr. Rodacker is authorized to execute contracts on behalf of Geocon. Mr.

Rodacker will oversee all materials testing and inspection services, and will act as primary point of contact for City personnel and their project team(s):

Shane Rodacker, PE, GE
Vice President I Principal I Contract Manager
Geocon Consultants, Inc.
6671 Brisa Street, Livermore, California 94550
Direct I 925.961.5271 Mobile I 925.337.9533 Email I [email protected] Geocon’s responsive service, timely delivery, and innovative and practical solutions on public works projects have resulted in a substantial percentage of repeat-client work. We look forward to continuing this standard of service under our next contract with the City of Brentwood.

Sincerely,
GEOCON CONSULTANTS, INC.

Shane Rodacker, PE, GE
DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 339 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey LE-22-022 2 March 8, 2022
City of Brentwood
Geotechnical Engineering/ Materials Services
B. SUBCONTRACTORS
Geocon has the in-house staff, equipment, and full-services and accredited laboratories to conduct special inspections and materials testing services for the City’s construction projects. Based on individual project requirements, Geocon may need to utilize subcontractors to support some geotechnical engineering task services. In order to provide the City with the best team for each project, Geocon has identified several qualified subcontractors, enabling Geocon the flexibility to retain the proper company to meet the City’s schedule, budget, and any local, state, or federal requirements for each project performed under this agreement:

Subcontractor Address Work Performed
Middle Earth Geo Testing, Inc.
(714) 633-5025
45459 Industrial Place
Fremont, CA
Geotechnical Drilling
and CPTs
Exploration GeoServices, Inc.
(408) 280-6822
1535 Industrial Avenue
San Jose, CA Geotechnical and Environmental Drilling
V&W Drilling
(209) 469-7700
1133 Blackhurst Drive
Aptos, CA Geotechnical Drilling
Cuesta Geo, Inc.
(925) 380-2550
2709 Kapalua Court
Fairfield, CA Geotechnical and Environmental Drilling
Ground Penetrating Radar Systems, Inc.
(415) 553-0129
5217 Monroe Street
Toledo, OH Underground Utility Locating
C. SUBMITTAL APPROACH

FIRM HISTORY, OFFICE LOCATIONS & CONTACT INFORMATION
Geocon is a California Corporation established in 1971 in San Diego. Since our inception, Geocon has grown into one of the largest California-only geo-environmental firms that delivers materials testing, special inspection, geotechnical engineering, and environmental engineering services to public agencies and private entities. Geocon currently employs a staff of over 280 individuals in nine offices throughout California: Livermore, Fairfield, Rancho Cordova, Burbank, Irvine, Murrieta, Palm Desert, Redlands, and San Diego. With multiple offices in California, we are well‐positioned geographically to serve our clients’ needs promptly, efficiently, and cost‐effectively.

Project assignments will be managed and dispatched from our Bay Area (Livermore) office with assistance as needed from our Rancho Cordova office/laboratory. Key leadership/project managers are identified below:

Name Phone Office Location
Shane Rodacker, PE, GE
Contract Manager/ Principal Engineer
O: 925.371.5900 x402
C: 925.337.5933
E: [email protected]
Bay Area
Andre Ashour, PE
Senior Project Engineer/ Project Manager
O: 925.371.5900 x419
C: 925.980.7111
E: [email protected]
Bay Area
Jake Bishop-Moser, PE
Senior Project Engineer/ Project Manager
O: 925.371.5900 x418
C: 510.266.2020
E: [email protected]
Bay Area

SERVICES/ CAPABILITIES

SPECIAL INSPECTIONS & MATERIALS TESTING
To confirm compliance with engineering specifications, Geocon is commonly retained to provide quality assurance materials testing and special inspection services during construction. We provide a full range of materials testing and special inspection services. Our field technicians and inspectors maintain current certifications including Division of State Architect (DSA), California Department of Transportation (Caltrans), International Code Council (ICC), DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 340 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey LE-22-022 3 March 8, 2022
City of Brentwood
Geotechnical Engineering/ Materials Services
National Institute for Certification in Engineering Technologies (NICET), and American Concrete Institute (ACI), American Welding Society (AWS-CWI), and Post Tensioning Institute (PTI).

Our in-house testing and inspection capabilities include the following disciplines:

Special Inspection/Materials Testing
• Shotcrete Placement • Concrete Placement/Curing
• Pre-Stress and Post-Tensioned Concrete • High-Strength Bolting • Epoxy Anchor Installation • Structural Steel Welding
• Reinforced Masonry Construction • Non-Destructive Testing • Structural Wood • Exterior Insulation and Finish Systems • Welder Qualifications • Fireproofing
• Reinforcing Steel Placement • Mechanical Anchors
• Steel and Welding Fabricator Shop Inspections • Batch Plant Inspections Foundations/Ground Improvement
• Spread Footings/Grade Beam Construction • Drilled Piers/Shaft Installation • Drilled/Driven Pile Installation • Micro-Pile Installation • Tie-Back Anchor/Soil Nail Installation • Proof/Load Testing • Prefabricated Vertical Drains • Compaction Grouting
• Conventional/Post-Tensioned Mat Foundation
Construction
• Stone Columns/Vibrocompaction/ Deep
Dynamic Compaction
Earthwork
• Site Grading Observation • Backfill Compaction Testing • Sloping/Compound Excavations/Shoring • Subgrade Preparation • Underground Utility Installation • Geotextile/Rock Stabilization • Chemical Treatment • Percolation Testing
• Base and Paving Placement • Rockery Walls
• Instrumentation/Monitoring

GEOTECHNICAL ENGINEERING
Geocon provides geotechnical engineering services on public works and private sector projects to a broad spectrum of clientele including public agencies, design professionals, and private developers. We are a full-service engineering consultant, capable of performing field and laboratory testing and engineering analyses with in-house staff and equipment. All projects are managed with the ultimate goal to produce technically sound, economically feasible solutions. This is achieved by considering construction costs and client needs in conjunction with site conditions and engineering requirements. Our innovative and practical solutions to complex geotechnical problems have resulted in a substantial percentage of repeat-client work.

We offer geotechnical expertise in the following areas:
• Due-diligence Geotechnical Evaluations • Seismic Hazard Assessments • Geotechnical Feasibility Studies • Risk-based Settlement Analysis • Geotechnical Investigations • Seismic Retrofits
• Geophysical Studies • Slope Stability Evaluations
• In-situ Testing • Landslide Evaluations
• Shallow and Deep Foundation Design • Fault Studies
• Pavement Design and Rehabilitation • Forensic Studies • Ground Improvement Evaluations • Vibration Monitoring • Plan and Specification Review • Geotechnical Instrumentation • Construction Management Support • Settlement Monitoring • Liquefaction Analysis • Value Engineering/Peer Review DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 341 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey LE-22-022 4 March 8, 2022
City of Brentwood
Geotechnical Engineering/ Materials Services

ORGANIZATIONAL CHART
(*) key project personnel.
(%) indicates estimated availability of our proposed
key project personnel.

The personnel identified herein are located in our
Bay Area (Livermore) and Northern California
(Rancho Cordova) offices. Key personnel home office
locations are further identified in the project team
table in the following page. Travel time and hourly
minimum rates are discussed in our Project
Approach.

PROJECT TEAM
The table below identifies the personnel assigned to this contract, their years of experience, role, location, education, and professional registrations or certifications. Resumes with biographies and specific project experience for the key personnel identified below are included in Appendix A.

DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 342 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey LE-22-022 5 March 8, 2022
City of Brentwood
Geotechnical Engineering/ Materials Services
Name/Title Title/Role
Office Location Education Certifications/Registrations
Shane Rodacker, PE, GE
23 years of experience Contract Manager - Bay Area BS, Civil Engineering PE #63291; GE #2915 Jeremy Zorne, PE, GE
24 years of experience
Quality Control Manager -
Northern CA
MS, Civil Engineering
BS, Civil Engineering PE #60936; GE #2636
Mark Repking, PG
17 years of experience
Laboratory Manager -
Northern CA BS, Geological Sciences PG #8569; ACI #01157617; Caltrans; Nuclear Gauge
Andre Ashour, PE
16 years of experience
Senior Project Engineer, Project
Manager - Bay Area
MS, Civil Engineering
BS Geotechnical & Mining
Engineering
PE #88145
Jacob Bishop-Moser, PE
8 years of experience
Project Engineer, Project
Manager - Bay Area BS, Structural Engineering
PE #91625; ACI Concrete FieldTesting Technician; Caltrans; Nuclear Density Gauge
Chris Merritt, PG, ACI, ICC
25 years of experience
Field inspections & testing:
soils, reinforced concrete,
bolting, rebar, masonry - Bay
Area
BS, Geology
PG #7156; ACI Concrete FieldTesting Technician; Caltrans; Nuclear Gauge
Bill Baumbach, ICC/ACI/CWI
15 years of experience
Field inspections & testing:
soils, concrete, rebar, bolting,
fireproofing, masonry,
shotcrete, field and shop
welding - Bay Area
BS, Business
DSA Masonry; DSA Shotcrete;
AWS Certified Welding Inspector;
ICC Master of Special Inspection;
ICC Reinforced Concrete,
Prestressed Concrete, Structural
Masonry, Structural Steel &
Bolting, Structural Welding, Sprayapplied Fireproofing; PTI Level 2 Post Tensioning; ACI Concrete
Field-Testing Technician
Robert Dail, ACI
31 years of experience
Field inspections & testing:
soils, concrete - Northern CA
Caltrans 105, 125, 231, 375, 504,
518, 533, 539, 540, 556, 557; ACI
Concrete Field-Testing Technician;
Nuclear Gauge
Brad Englund, ICC/ACI
Special Inspector
25 years of experience
Field inspections & testing:
soils, concrete, masonry, rebar-
- Northern CA
Caltrans 504, 518, 533, 539, 540,
543, 556, 557; ACI Concrete FieldTesting Technician; ICC Reinforced Concrete; ICC Structural Masonry;
Nuclear Gauge
Tim Massey, CWI
41 years of experience
Field and Shop Welding; NDT -
Northern CA
Chabot College, Welding
Technology; Contra Costa
College, Level II Ultrasonic
Testing & Welding
Metallurgy
AWS Certified Welding Inspector;
Level II RT, MT, & PT
Charles Arroyo, CWI, ICC
11 years of experience
Field inspections & testing:
soils, concrete, rebar, bolting,
fireproofing, masonry, field &
shop welding - Bay Area
AWS Certified Welding Inspector;
ICC Structural Steel/Welding, High
Strength Bolting, Structural
Masonry, Spray Applied
Fireproofing; Nuclear Gauge
Francisco Gonzalez, EIT, ACI, ICC
6 years of experience
Field inspections & testing:
soils, concrete, rebar - Bay Area
MS, Engineering Science
BS, Engineering Science
EIT #155396; ACI Concrete FieldTesting Technician; ICC Reinforced Concrete; Nuclear Gauge
Angelina Castillo, ACI
5 years of experience
Lab/Field Testing: concrete,
soils - Bay Area BS, Civil Engineering
ACI Concrete Field-Testing
Technician; ACI/AB Testing
Technician; Nuclear Gauge
Bethany O’Connor, ACI
1 year of experience
Lab/Field Testing: concrete,
soils - Bay Area BS, Earth Sciences
ACI Concrete Field-Testing
Technician; ACI/AB Testing
Technician; Nuclear Gauge
DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 343 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey LE-22-022 6 March 8, 2022
City of Brentwood
Geotechnical Engineering/ Materials Services

PROJECT EXPERIENCE
For over 50 years, Geocon has provided professional geotechnical engineering, engineering geology, materials testing, and special inspection services to public agencies throughout California. Our offices and laboratories are geographically positioned to best serve our clients with exceptional materials testing and construction inspection services. Our experience includes numerous geotechnical engineering, construction inspection, and materials testing contracts throughout Northern California, including our current contract with the City of Brentwood:

Under our on-call agreement with the City of Brentwood, we have performed a range of services such as a geotechnical investigation on portions of Fairview Avenue and Fairview Court to evaluate the compaction characteristics of underground utility backfills that are a suspected cause of settlement; geotechnical engineering and testing services for Roadway Improvements along Lone Tree Way; geotechnical testing and observation during improvements at the City’s Wastewater Treatment Plant; materials testing for the Sycamore and Beatrice Avenue Sewer Rehabilitation Projects; geotechnical testing and special inspections for new equipment pads for Water Emergency Backup Generators; and pavement coring, materials testing, and subgrade evaluation at multiple locations throughout the City, including the 2017 PMP Slurry Seal and AC Overlay for which Geocon conducted geotechnical testing and inspection during slurry seal, AC overlay and AC repairs; and the 2017 & 2018 PMP Coring and Subgrade Evaluations. For the 2017/2018 evaluation, Geocon performed a materials investigation to evaluate pavement thickness and subgrade soils at eight locations throughout the City; we worked closely with City representativesto ensure services were provided in a responsive, thorough manner, completed at or under budget, and completed within the desired project timeframe.

Under our current agreement, we are also providing the City with geotechnical services for the design and construction of a new event center and amphitheater - The Vineyards Amphitheatre – on the west side of Vineyards Parkway. The project consists of site development and construction of an amphitheater and an 8,000 square foot Barn structure on a 31-acre site that was rough graded in the late 2000s. A wedding pavilion, two event center buildings and a variety of other amenities are also planned. Geocon conducted a geotechnical investigation to observe the soil and geologic conditions that may impact site development for the project as planned. As of the date of this SOQ, the geotechnical investigation is essentially complete, and the City has been presented with an updated draft geotechnical investigation report that reflects City design team feedback on the initial draft report that was issued in December 2021. Our geotechnical investigation identified critically expansive soils in portions of the site; recommendations to mitigate the potential effects of expansive soils were included in the project geotechnical report.

Highlighted below are a few additional examples of our project experience similar to the Capital Improvement Program (CIP) projects outlined in the City of Brentwood CIP 2021/22 – 2025/26:

CITY OF SAN PABLO, ON-CALL MATERIALS TESTING SERVICES
Geocon is providing on-call materials testing services to the City of San Pablo under a multi-year agreement. Services include materials testing of public improvements construction within public right of way and/or publicly owned properties. Geocon performs quality assurance testing on behalf of the City to assure that construction projects are in conformance with contract specifications. Under this agreement we performed QA testing for the Brookside Drive Pavement Rehabilitation: This project included the reconstruction of Brookside Drive in San Pablo. The existing roadway was milled to a depth of 12 inches and a new pavement section was subsequently constructed. The new pavement structural section consists of 4 inches of asphalt over 8 inches of aggregate base. Minor dry utility crossings and base repairs were also conducted.

Our testing and observation services for the project included compaction testing of subgrade, aggregate base and asphalt materials and associated laboratory testing. Total project cost: $1,054,300 DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 344 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey LE-22-022 7 March 8, 2022
City of Brentwood
Geotechnical Engineering/ Materials Services
El Portal Drive Urban Greening: Our team conducted compaction testing for this project that consisted of street improvements at El Portal Drive. The Urban Greening Project is a state and locally funded multi-benefit project to incorporate stormwater facilities, urban greening and new bike lanes on the segment of El Portal Drive between Church Lane and Fordham Street. In-place density testing was conducted by our technicians, and materials were transported to our laboratory for analysis. Total project cost: $905,000 FY 18/19 Pavement Repairs: Under our on-call, Geocon performed geotechnical and materials testing for the City’s 2018-2019 pavement repair project, City Task #MAR-600. The repair project consisted of milling, digout repairs and hot mix asphalt (HMA) overlays along Market Avenue, Mission Bell Drive and Road 20. Our testing and observation services for the project included compaction testing of asphalt materials and associated laboratory materials testing. Nuclear density gauge sampling was performed by our Caltrans-certified technician in accordance with CTM 375 and City of San Pablo QAP dated July 2014. Materials testing performed in Geocon’s in-house laboratory included Hveem Density per CTM 308, Stability per CTM 366, AC content per CTM 382 and aggregate gradation per CTM 202. Total project cost: $2,000,000 Project team: Rodacker; Bishop-Moser; Gonzalez; Castillo Completion: Ongoing (current agreement 2016-2022)
Agency reference: Allan A. Panganiban, P.E., Senior Civil Engineer; City of San Pablo; 510.215.3062; [email protected]

CITY OF CONCORD ON-CALL GEOTECHNICAL ENGINEERING AND MATERIALS TESTING SERVICES Since 2009 Geocon has provided the City of Concord with geotechnical and environmental services under on-call contracts. Services include geotechnical and materials testing during construction of roadway safety improvements; soil investigations; hazardous materials surveys; arsenic sampling; human health risk assessment; and more. Under this on-call Geocon conducted geotechnical and materials testing for the Cowell Road Safety Improvements. The project consisted of the construction of new curbs and gutters, sidewalks and valley gutters at Cowell Road and Saint Francis Drive. The project was funded with $92,500 in TDA funds and $21,000 in Measure J funds. Geocon’s scope of services included Quality Assurance testing and observation during aggregate base placement; testing and observation during asphalt paving operations; and asphalt laboratory testing. All laboratory materials testing was performed in Geocon’s in-house accredited lab in accordance with City and County regulations and the City’s Quality Assurance Program. Total project cost: $135,500 Project team: Rodacker; Bishop-Moser; Gonzalez; Castillo Completion: Ongoing (current agreement 2021-2023)
Agency reference: Bernard Enrile, Capital Improvement Program Manager; City of Concord; 925.671-3031; [email protected]

CITY OF PLEASANTON, ON-CALL GEOTECHNICAL ENGINEERING AND MATERIALS TESTING SERVICES Geocon has provided on-call geotechnical, materials testing and inspection services to the City of Pleasanton under on-call agreements since 2011. Services include geotechnical engineering and consultation; geotechnical testing and observation; special inspections & testing; pavement coring; independent assurance testing; and more.

Geocon performed construction inspection and materials testing for the Stanley Boulevard Reconstruction, completed in 2017. The reconstructed roadway now has new curb-to-curb widths on the order of 40 to 55 feet and edge drains.

Traffic configurations consist of various combinations of travel, bike, parking, and turn lanes. The roadway structure consisted of 2 inches of rubberized hot mix asphalt over 3 inches of Type A hot mix asphalt over 12 inches of Class 2 aggregate base. Our scope included field observation of earthwork activities; field compaction testing of subgrade, AB, asphalt materials, and utility trench backfill; observation of concrete placement; and associated laboratory testing for soils, AB and concrete. Supplemental geotechnical DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 345 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey LE-22-022 8 March 8, 2022
City of Brentwood
Geotechnical Engineering/ Materials Services
recommendations were also provided during construction to address the presence of shallow utilities and inadequacies in the project geotechnical report (prepared by others). Total project cost: $1,500,000 Rotary Park Improvements: This CIP project included various improvements to the existing Rotary Park at the southeast corner of Main Street and Vervais Avenue in Pleasanton. Renovations included site work upgrades, including a trellis, fences, gates, paving, planting, furniture, and lighting. Geocon performed soil compaction testing and laboratory materials testing during the improvements. Total project cost: $750,000 Arroyo Mocho Trail: Through our current on-call, Geocon conducted a geotechnical investigation for the reconstruction of approximately two miles of recreational trail within an engineered flood control channel that traverses the City. Recommendations and professional opinions were provided for several proposed trail pavement systems – including pervious concrete pavement, TerraPave® and conventional asphalt pathways. The entire trail is subject to occasional maintenance vehicle traffic for the adjacent flood control facilities and recommendations were provided for construction observation to substantiate proper subgrade support characteristics. Geocon’s investigation also evaluated options for the reuse of existing trail surfacing materials.

During construction, Geocon conducted field observation, sampling, and testing services for all three segments.

Segment one improvements included the scarification and recompaction of existing aggregate base materials with the upper 2 inches of the aggregate base being resin-treated to form TerraPave® all-weather surfacing.

Segment 2 included the excavation of the existing trail to a depth of approximately 1 foot below existing grade.

Existing aggregate base materials were salvaged for reuse in Segment 3. Segment 2 trail paving consisted of 6 inches of pervious concrete over 6 inches of ¾” drain rock over geosynthetic filter fabric over subgrade. Segment 3 was regraded to establish proper cross-slope drainage and new trail pavement was constructed. The Segment 3 paving section consisted of 2½ inches of AC over 4 inches of Class 2 AB over geosynthetic stabilization fabric over 6 inches of scarified and recompacted subgrade. Total project cost: $797,000 Project team: Rodacker; Ashour; Bishop-Moser; Merritt; Baumbach; Arroyo; Massey Gonzalez; Castillo; O’Connor Completion: Ongoing (current agreement 2018-2022)
Agency reference: Adam Nelkie, Acting Director of Engineering; City of Pleasanton; 925.931.5675; [email protected]

CITY OF DUBLIN ON CALL GEOLOGIC AND GEOTECHNICAL ENGINEERING AND MATERIALS TESTING SERVICES Geocon is currently performing professional geologic and geotechnical engineering and materials testing services for the City of Dublin under a multiyear agreement. Since 2012 we have supported the City with on-call services for Capital Improvement Projects throughout the City. Under this on-call, Geocon performed a range of services for the failing Alamo Creek Trail. Geocon performed a geotechnical investigation for the trail, which was showing signs of distress throughout the asphalt and rigid concrete pavement sections.

Historically, the trail required frequent maintenance to preserve the City’s desired level of serviceability. Geocon performed an investigation to observe the soils conditions and evaluate potential causes of distress along the trail. Upon completion of our investigation, we recommended that the City remove existing trail pavements and replace them with a conventional asphalt pavement section that incorporated geosynthetic reinforcement to mitigate the potential for future tension cracking in the trail pavement. Geocon later provided the City with civil design services and geotechnical testing and observation services during reconstruction of the trail. Our civil design services included design and plan preparation for the removal of existing pavements and construction of new asphalt pavement section; development of specifications; and providing an engineer’s estimate of probable construction costs. Total project cost: $665,000
Project team: Rodacker; Ashour; Bishop-Moser; Gonzalez; Merritt; Castillo Completion: Ongoing (current agreement 2021-2023)
Agency reference: Andrew Russell, Director of Public Works; City of Dublin; 925.833.663; [email protected] DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 346 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey LE-22-022 9 March 8, 2022
City of Brentwood
Geotechnical Engineering/ Materials Services

PROJECT APPROACH
All of Geocon’s projects are managed with the ultimate goal to produce technically sound, economically feasible solutions. This is achieved by considering construction costs and client needs in conjunction with site conditions and engineering requirements. Our innovative and practical solutions to complex geotechnical and environmental challenges have resulted in a substantial percentage of repeat-client work. Our project managers are selected to provide oversight of daily activities and communicate details with our senior management to ensure successful and timely project completion. Field services will be invoiced portal-to-portal from our Livermore office location, per the fee schedule in Appendix C. Minimum daily charges will not apply to dedicated trips for sample pickup.

SCHEDULE CONTROL
Schedules for geotechnical investigations are typically driven by the availability of drilling subcontractors and agency permitting timelines. Once the scope of a geotechnical investigation is developed and agreed upon with the City, Geocon will immediately contact relevant subcontractors and agency personnel to determine availability and anticipated permit turnaround times, respectively. Geocon will review that information in conjunction with staff field scheduling and then provide the City with accurate and achievable timelines for milestones such as drilling, laboratory testing and report delivery.

Materials testing and special inspections will be conducted/scheduled as determined by the owner’s or general contractors’ schedule. Once a project moves into construction, the onsite schedule is controlled by the general contractor and/or construction manager. While this schedule (and the means and methods of the contractor) is not controlled by Geocon, our large pool of in-house engineers and technicians make it possible to respond quickly to inspection requests, thus eliminating delays and potential added costs to the City.

Costs for testing and inspection services are typically billed in two-hour increments. Technicians and inspectors are dispatched based on their place residence or anticipated field schedule, allowing us to shorten travel time, as well as accommodate last-minute inspection requests. This also aids in rapid pick-up and transportation of samples from the project site to the Geocon laboratory. Furthermore, our statewide in-house laboratories assist in short turnaround of laboratory testing.

ENVIRONMENTAL AND PERMITTING CHALLENGES
Geocon is diligent to address the needs of environmentally sensitive areas and work with appropriate agency oversight to adhere to protocols. Our staff understands the importance of direct communication that establishes a dialogue of understanding concerning scope of work and project milestones. Based on our experience, potential impacts on the critical path (such as environmental permitting and regulatory agency approvals) are identified early to reduce impacts to project schedule and allow for contingency planning. Our primary goals are to perform our field investigations with minimal environmental, impact and to effectively evaluate the geotechnical and geological conditions at the projectsite and develop cost-effective solutions for geotechnical-related design while maintaining our ethical obligation of protecting the safety, health, and welfare of the public.

SCOPE OF WORK
Geocon has thoroughly reviewed the RFQ dated February 1, 2022, and we are prepared to provide the City with professional and cost-effective geotechnical engineering, special inspection, and materials testing services for the Infrastructure Projects. Based on our review of the RFQ and the Capital Improvement Program 2021/22 – 2025/266, we understand that potential projects will include parks and trail improvements, PMP/roadway improvements, water distribution, and other, as-needed construction.

SPECIAL INSPECTIONS AND MATERIALS TESTING
Geocon’s materials technicians/special inspectors are experienced, highly qualified, and maintain technical certifications including, but not limited to, Caltrans, International Code Council (ICC), American Concrete Institute (ACI), American Welding Society (AWS), and the Post Tensioning Institute (PTI). The proposed materials DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 347 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey LE-22-022 10 March 8, 2022
City of Brentwood
Geotechnical Engineering/ Materials Services
technicians/special inspectors for this contract have the necessary certifications to perform the services outlined in the RFQ. Our standard testing and inspection procedures are as follows:
• When Geocon receives an inspection request from the City or their representative (Construction Manager, Project Manager, Superintendent, Owner’s Authorized Representative, and/or IOR), we document the request in writing including the date and time of the inspection, type of inspection requested, person requesting the inspection, and a contact phone number.
• We verify that the person requesting the inspection has been authorized by the City to request the inspection.

Once all information has been verified, Geocon dispatch will schedule the requested inspection(s). • On the day of inspection, Geocon’s Inspector will meet the appropriate onsite City representative to verify the type and location of inspection needed.
• Inspections will be performed in accordance with project specifications and City and/or County requirements. • The inspector will provide daily written reports of inspection indicating compliance or non-compliance, which are to be signed by the City representative before our inspector leaves the project site. Reports detail the inspector’s arrival and departure times, as well as specific details about activities performed. • The inspector obtains samples as required and transports them to our in-house laboratory for testing and analysis.

Deliverables
Following field inspection services, Geocon’s inspector will provide a hand-written copy of the completed field report for signature to the City, prior to departure. Geocon will submit copies of each certified written report of each inspection, test or similar service, to all parties as coordinated with the City. Geocon will prepare reports summarizing all observations, test results, analyses, and recommendations for services in a timely manner. Copies of reports are provided in electronic and/or hard copy format, as requested.

GEOTECHNICAL ENGINEERING
Investigations will include all necessary laboratory testing and geotechnical and geologic analyses and reports will include recommendations for mitigating adverse soil conditions and will address all constructability issues with respect to earthwork, paving and foundation design. Our scope of work for geotechnical and geologic investigations will typically include the following tasks:

Pre-Field Activities/Set‐up
• Confirm with the project manager that the scope of work complies with project requirements. • Identify the proposed boring and test pit locations with stakes and white paint in the field. • Coordinate proposed exploration locations with site facilities personnel as necessary. • Contact Underground Services Alert (USA) two working days prior to performing the exploration. • Obtain the required excavation, well, or encroachment permits, as necessary. • Retain drilling/excavation equipment (drill rig, backhoe, excavation crew, etc.) for the field exploration.

Field Activities/Exploration
Field activities and exploration services will include implementing the planned exploration and testing program which may include, but will not be limited to the following tasks:
• Geologic mapping
• Exploratory borings (hand auger, bucket auger, rotary wash, hollow-stem auger, etc.) • Downhole logging of bucket auger borings
• Exploratory test pits and/or trenches
• Cone Penetration Testing
• Geophysical testing (seismic refraction/reflection, downhole geophysics, etc.) DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 348 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey LE-22-022 11 March 8, 2022
City of Brentwood
Geotechnical Engineering/ Materials Services
• In‐situ testing
• Fault trenching
• Logging and material classification
• Collection of soil/rock samples (disturbed and undisturbed) • Percolation testing
• Backfilling excavations
Geotechnical Laboratory Testing
The laboratory testing program for each geotechnical investigation is tailored specifically to the needs of each project and is contingent upon the types of earth materials encountered, the weight and nature of the proposed improvement, the depth of the proposed excavation, and the requirements of the building official.

Engineering, Geologic Analyses and Report Preparation
Upon completion of the field exploration and laboratory testing programs, engineering and geologic analyses will be performed to develop conclusions and determine the most cost-effective and constructable recommendations for the mitigation of geologic issues, slope instability, and/or design and construction of the proposed structures/improvements. Our analyses may include, but will not be limited to, the following:
• Evaluation of geologic conditions including slopes, nearby faults, and other geologic hazards. • Evaluation of potential for surface fault rupture.
• Evaluation of expected ground motions via deterministic and probabilistic seismic hazard analyses. • Static and pseudo-static slope stability analyses for temporary and permanent slopes. • Evaluation of soil/geologic materials and consideration of excavation difficulties. • Assessment of excavated earth materials and suitability for reuse or disposal. • Assessment of demolished construction materials and suitability for incorporation in engineered fills. • Evaluation of groundwater conditions, seepage and static groundwater table. • Evaluation of soil conditions for suitability of stormwater infiltration. • Liquefaction and seismic settlement potential.
• Corrosion potential for concrete and utility pipes in direct contact with site soils. • Evaluation of shallow and deep foundation systems with appropriate soil bearing values. • Soil compressibility and settlement characteristics under different loading conditions. • Soil expansion potential and mitigation measures.
• Soil modulus of subgrade reaction.
• Evaluation of existing and proposed underground utilities. • Design and construction recommendations for:
o Shallow spread and/or deepened foundations.
o Retaining walls and sound walls.
o Concrete slabs, paving sections, and/or treatments for base and paving subgrade. o Temporary and permanent excavations.
o Suitability of soils for stormwater infiltration.
o Site drainage and any other specific recommendations.

Deliverables
The results of our study will be compiled in a comprehensive geotechnical report with relevant figures, field data and laboratory test results; and findings, conclusions, and recommendations specific to the project. Our standard practice is to issue geotechnical reports electronically in pdf format, followed by final reports in pdf form after the receipt and incorporation of City and/or design team comments.

DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 349 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey LE-22-022 12 March 8, 2022
City of Brentwood
Geotechnical Engineering/ Materials Services

QUALITY OF WORK
Geocon implements a quality assurance/quality control (QA/QC) program tailored for each project. QA/QC and project management procedures employed for a project typically include the following:
• Dependent upon the site location and the nature of the requested work, the project scope requirements received from the client are reviewed by the Geocon principal and assigned to the appropriate reviewer. • Available site information and data from previous studies (if available or applicable) is reviewed. • Based on site-specific objectives, and/or if requested by the client, we prepare a recommended scope of work for client review and approval. The recommended scope of work is based on Geocon's technical review of available documentation and is designed to meet the client’s site objectives, while meeting appropriate agency requirements.
• Upon concurrence by the client with the technical work scope, Geocon prepares cost estimates for the client’s review and acceptance. All costs are described, justified, and presented as required per the client contract.
• Projects are reviewed periodically to verify compliance with contract requirements concerning deliverables, reporting, and invoicing. Resource allotments and scheduling arrangements are planned or modified to meet the client’s requirements.
• Quality control reviews are performed by the principals to track conformance with Geocon’s internal QA/QC work product standards and those of the client.

Geocon's quality assurance program provides accuracy and reproducibility meeting or exceeding industry standards. We accomplish this through the application of experienced staff, ongoing staff training, calibration of testing equipment by certified independent agencies and periodic review of Geocon's personnel and procedures by outside accredited agencies. Projects are reviewed periodically to verify compliance with contract requirements concerning deliverables, reporting, and invoicing. Quality control reviews are performed by the principals to track conformance with Geocon’s internal QA/QC work product standards and those of the client.

Please refer to Appendix B for abbreviated condensed/sample work products.

REPORTING
It is Geocon’s standard practice to have daily field reports signed by the on-site client designated representative.

Written reports of each inspection test typically include the following:
• Date of issuance
• Project title and number
• Consultant name and contact information
• Dates and locations of samples, tests, or inspections • Names of individuals making the inspections or the tests • Time of arrival and time of departure
• Designation of the work or test methods
• Identification of product, specification section, and drawing • Complete inspection or test data
• Test results and interpretation of test results
• Ambient conditions at the time a sample is taken/tested • Comments/professional opinion if inspected work complies with contract requirements
• Name and signature of laboratory inspector
• Recommendations of re-testing
DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 350 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey LE-22-022 13 March 8, 2022
City of Brentwood
Geotechnical Engineering/ Materials Services
Reports will include a description of deficiencies noted and corrective action undertaken to resolve such deficiencies. Deficiencies observed will immediately be brought to the attention of the City representative.

Geocon will maintain a deficiency list of all items not corrected and will re-inspect the area after the deficiency has been corrected.

Geocon is conscious of the importance of timeliness during report preparation and when responding to questions from the project team throughout the duration of the project. Documents are provided to the project team in electronic (pdf) format to keep projects moving forward expeditiously. Reports are typically sent electronically via email and by hard copy mail once a project is completed.

LABORATORY TURNAROUND TIMES*
Our soils and materials testing laboratory is certified by the American Association of State Highway and Transportation Officials (AASHTO), California Department of Transportation (Caltrans), Materials Reference Laboratory (AMRL), Cement and Concrete Reference Laboratory (CCRL), and Division of State Architect (DSA). Testing of soil, aggregate, asphalt concrete, and Portland cement concrete is performed in accordance with published test procedures such as American Standards for Testing Materials (ASTM), Caltrans, USACE, AASHTO, or the governing building code. In-house quality assurance programs are maintained to provide a professional level of accuracy and reproducibility acceptable to current industry standards. This is accomplished by internal staff training, calibration of appropriate testing apparatus by certified independent agencies, and periodic inspection by outside accredited testing and inspection agencies.

Our laboratory is extensively equipped and staffed with trained and qualified personnel. Registered engineers oversee laboratory testing services and provide quality control over all tests performed. Listed below are maximum turnaround times for typical tests:
• Gradation / Sieve Analysis – ASTM C 136 / CTM 202: 3 days • Organic Impurities – ASTM C 40 / CTM 213 : 1 day
• Unit Weight – ASTM C 29 / CTM 212: 2 day
• Sand Equivalent Tests – ASTM D 2419 / CTM 217: 2 days • Cleanness value – CTM 227: 2 days
• Specific Gravity and Absorption – ASTM C 128 / CTM 207 & CTM 206: 2 days • Moisture Content Determination – ASTM C 2216 / CTM 226: 1 day • Crushed Particles – CTM 205: 1 day
• California Impact – CTM 216: 1 day
• Stabilometer Value – CTM 304 / CTM 366: 1 day
• Bitumen Content of Paving Mixture – CTM 382 / D 6307: 1 day after oven calibration • Gradation of Extracted Sample – ASTM D 5444 / CTM 202: 2 days • Maximum Density – CTM 304 / CTM 375: 1 day
• Moisture Content of AC – CTM 370: 1 day
• Concrete / Masonry / Grout / Mortar: Results available day of request/break date • Rebar tensile and bend (A615/A706): 2 days
o Standard nut, bolt and washer sets (hardness and tensile): 2 days o Galvanized/Coated nut, bolt and washer sets: (hardness and tensile) 3 days Please refer to the fee schedule in Appendix C for a complete list of laboratory tests and fees. Specialized tests not listed in Appendix C can be performed upon request.

DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 351 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey LE-22-022 14 March 8, 2022
City of Brentwood
Geotechnical Engineering/ Materials Services
D. AGREEMENT PROVISIONS
Geocon’s legal team has reviewed the City’s Professional Services Standard Agreement that was provided with the RFQ and respectfully requests the following modifications in accordance with Civil Code section 2782.8 and current industry standards:
• Section 5.1 – The last sentence regarding retention should be deleted entirely as retention holding is not applicable to design professional services.
• Section 7 - The majority of the subcontractors Geocon Consultants hires do not carry more than the industry standard limits for General Liability insurance ($1,000,000 per claim) and ever fewer carry any kind of Umbrella Liability coverage to meet the $2,000,000 requirements in Section 10.1.1. Furthermore, the majority of our subcontractors are contractors who not required to carry Professional Liability insurance as it is not applicable to their trade. To require our subcontractors to purchase additional insurance to meet these requirements be an undue financial burden as the additional insurance premiums would far exceed their fees.
• Section 9 – This section requires numerous edits to make it insurable under a design professional’s insurance policies and for compliance with CA Civil Code section 2782.8. • Section 10 – This section requires numerous edits for insurability, including but not limits to: revising the first sentence of Section 10 as Geocon’s insurance does not cover actions by other agents, representatives, or subcontractors (we require these entities to provide their own insurance), deleting the section sentence of Section 10.1, deleting the terms “agents” and “volunteers” as additional insured entities (vague and overbroad), making it clear primary/non-contributory coverage is only available under General and Automobile Liability in Section 10.6, and adding additional language to Section 10.8 clarifying that Geocon Consultants’ Professional Liability policy can provide waiver of subrogation coverage per policy form as required by written contract only (no physical endorsements can be provided).

E. CONFLICT OF INTEREST
Geocon has reviewed the RFQ and has no knowledge of any agreements or affiliations which may create a conflict of interest or the appearance of a conflict of interest during performance of the contract.

DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 352 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey

1. COVER LETTER
APPENDIX A:

KEY PERSONNEL RESUMES
DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 353 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey

SHANE RODACKER, PE, GE

PRINCIPAL ENGINEER/PROJECT MANAGER
Mr. Rodacker has 20+ years of experience managing geotechnical and materials testing services and contracts for the design and construction of transportation and infrastructure projects, public roadway improvements, municipal facilities, and more. His expertise includes slope stability analysis, foundation design, pavement design, hillside grading and the mitigation of complex geologic problems during land development. His practical methods of addressing unique problems during design and construction has earned him a reputation of providing exceptional service and cost-saving solutions to a satisfied client base. A variety of public agencies, design engineers and architects, and private sector clientele rely on his experience and wider project perspective when making decisions regarding project feasibility, foundation systems and site development.

CITY OF BRENTWOOD, ON-CALL CONSTRUCTION INSPECTION AND MATERIALS TESTING, BENTWOOD, CALIFORNIA Mr. Rodacker is the contract/project manager and senior engineer for this on-call. He handles the dayto-day management of projects and coordination with City personnel. Services include geotechnical engineering and testing services for roadway improvements; testing and observation for improvements of City facilities; materials testing for sewer rehabilitation projects; pavement coring and subgrade evaluation services throughout the City; and other as-needed testing and inspection for projects under the City’s Pavement Management Program. Geocon performed pavement coring and subgrade evaluation services at multiple locations throughout the City. Projects included the 2017 PMP Slurry Seal and AC Overlay for which Geocon conducted geotechnical testing and inspection during slurry seal, AC overlay and AC repairs; and the 2017 & 2018 PMP Coring and Subgrade Evaluations. For the subgrade evaluations, Geocon performed a materials investigation to evaluate pavement thickness and subgrade soils at 8 locations throughout the City. Geocon also conducted geotechnical testing and observation for the construction of a new parking lot and storm drain improvements at the Contra Costa County Sheriff’s Delta Patrol Station.

CITY OF CONCORD, ON-CALL GEOTECHNICAL ENGINEERING AND MATERIALS TESTING SERVICES, CONCORD, CALIFORNIA Since 2009 Geocon has provided the City of Concord with materials testing, geotechnical, and environmental services under on-call contracts. Projects have included geotechnical and materials testing during construction of roadway safety improvements; soil investigations; hazardous materials surveys; arsenic sampling; human health risk assessment; and more. Mr. Rodacker is the principal engineer overseeing geotechnical engineering and materials testing services for these contracts. Under our last agreement, Geocon conducted geotechnical and materials testing during construction for the Cowell Road Safety Improvements. The improvement project consisted of the construction of new curbs and gutters, sidewalks and valley gutters at Cowell Road and Saint Francis Drive, in Contra Costa County. Geocon’s scope of services included Quality Assurance (QA) testing and observation during aggregate base placement; testing and observation during asphalt paving operations; and asphalt laboratory testing.

CITY OF SAN PABLO, ON-CALL MATERIALS TESTING SERVICES, SAN PABLO, CALIFORNIA Geocon is providing on-call materials testing services to the City of San Pablo under a multi-year agreement. Services include materials testing of public improvements construction within public right of way and/or publically owned properties. Geocon performs quality assurance testing on behalf of the City to assure that construction projects are in conformance with contract specifications. Mr. Rodacker is the contract/project manager and senior engineer for this on-call. He oversees all projects conducted Education
• BS, Civil Engineering,
North Dakota State
University
Registrations
• CA: Geotechnical
Engineer, No. 2915
• CA: Professional
Engineer, Civil, No.
63291
DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 354 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey

SHANE RODACKER, PE, GE

PRINCIPAL ENGINEER/PROJECT MANAGER
under this agreement. Projects to date have included geotechnical and materials testing for the City’s 2018-2019 pavement repair project; in-place density testing for a pavement rehabilitation project on Brookside drive; and compaction testing for street improvements on El Portal Drive.

CITY OF PLEASANTON, ON-CALL GEOTECHNICAL ENGINEERING AND MATERIALS TESTING SERVICES, PLEASANTON,

CALIFORNIA
Mr. Rodacker is the contract/project manager and senior geotechnical engineer for our current on-call contract with the City of Pleasanton. Under this agreement, Geocon has provided geotechnical consultation services for numerous projects. Projects have included geotechnical engineering and materials testing for the Arroyo Mocho Trail and Pioneer Cemetery; materials testing during improvements to Rotary Park; geotechnical and materials testing for a water main replacement along Main Street and Santa Rita Road; pavement coring on Bernal Avenue; independent assurance testing and review during the federally funded rehabilitation of Valley Avenue and Hopyard Road; and construction materials testing and inspection services during the complete reconstruction of Stanley Boulevard.

CONTRA COSTA COUNTY ON-CALL GEOTECHNICAL ENGINEERING CONSULTING SERVICES, CONTRA COSTA COUNTY

CALIFORNIA
Geocon has worked with Contra Costa County to perform on-call geotechnical engineering consulting materials testing, and environmental consulting services since 2005 and was recently awarded another three-year contract to perform on-call geotechnical consulting services based on our excellent track record of service. Mr. Rodacker is the contract/project manager and senior geotechnical engineer for all projects performed under the agreement.

CITY OF AMERICAN CANYON, ON-CALL GEOTECHNICAL ENGINEERING AND MATERIALS TESTING SERVICES, AMERICAN

CANYON, CALIFORNIA
Mr. Rodacker is the project manager/principal for this 5-year contract to provide on-call geotechnical services for various capital improvement projects. Task orders under this contract have included:
geotechnical testing services for the widening of Napa Junction Road at its intersection with State Route 29, testing and observation during the installation of a new water main and the widening of Newell Drive, geotechnical field and laboratory testing during backfill of jacking and receiving pits for a 14-inch waterline pipe bursting project on the west side of State Route 29, and geotechnical testing and observation during the replacement of 2,500 linear feet of sewer main along Theresa Avenue and Los Altos Drive. Testing for these projects was performed on subgrade, aggregate base, asphalt pavement, sidewalk, curb and gutter and new underground utilities along each roadway.

CITY OF DUBLIN, ON-CALL GEOLOGIC AND GEOTECHNICAL SERVICES, DUBLIN, CALIFORNIA Mr. Rodacker is Geocon’s Contract Manager for our current, multi-year agreement to perform geologic and geotechnical services for the City’s CIP projects. Under this on-call Geocon has performed a variety of materials testing, inspections and geotechnical services. Services include testing and observation during construction City infrastructure improvement projects; geotechnical investigations for the repair and construction of roadway projects; and more.

DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 355 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey

JEREMY ZORNE, GE

QUALITY ASSURANCE MANAGER
Mr. Zorne has 23 years of experience conducting and managing geotechnical, and materials testing and special inspection projects throughout California and has been with Geocon for his entire professional career. His diverse project experience includes transportation infrastructure (roadways, bridges, and retaining walls), public buildings, parks and recreation facilities, water/wastewater treatment and distribution facilities, educational facilities, commercial/industrial development, and residential developments. He is currently managing several on-call contracts for various agencies throughout Northern California. Mr. Zorne is Geocon’s QA/QC manager for several Bay Area on-call contracts including the Cities of Concord, Dublin, Pleasanton, Benicia, Vallejo, Gilroy, Contra Costa County, and more.

CITY OF VACAVILLE, DIF 54-FRY ROAD/CSP – SOLANO SEWER, PHASES 1 AND 2 Mr. Zorne was the project manager overseeing the geotechnical investigation and subsequent testing and observation for this project that constructed a replacement gravity trunk sewer pipeline extending from the Fry Road crossing of the Union Pacific Railroad tracks to the City of Vacaville’s Easterly Wastewater Treatment Plant (EWWTP). Our geotechnical investigation was performed on the first two of three phases with approximately 3,700 linear feet of new 48-inch PVC lined reinforced concrete pipe (RCP)/trunk sewer, adjacent to an existing 27-inch line, on Phase 1, and the replacement of approximately 1,500 feet of an existing 27-inch line with new 30-inch diameter pipe, of high strength vitrified clay pipe (VCP). Phase 1 requires a trenchless (bore-and-jack) installation at the UPRR crossing with conventional open-cut construction techniques for installation on Phase 2.

COUNTY OF NAPA,ON-CALL GEOTECHNICAL ENGINEERING, MATERIALS TESTING, AND SPECIAL INSPECTION SERVICES Geocon has performed on-call geotechnical engineering, materials testing, and special inspection services for the County since 2011. Mr. Zorne is our QA/AC Manager for this on-call. Challenging projects have included asphalt overlays on County roadways through challenging hillside terrain and a soldier-pile retaining wall to mitigate existing landslide deposits. Under our on-call, Geocon performed material testing services for the federally funded Silverado Trail Overlay (Phase H) Project. The project included approximately 59,000 square feet of dig-out repairs and a subsequent 2-inch overlay of hot mix asphalt along the Silverado Trail and associated driveway entrances between St. Helena and Zinfandel Lane. Digout repairs consisted of the excavation of 4 inches of existing roadway section, and replacement with ¾- inch Type A asphalt. The overlay consisted of 2 inches of ½-inch Type A asphalt. Our field technicians performed faulty assurance field testing and sampling during overlay operations, and our in-house laboratory performed materials testing of aggregates and asphalt. Mr. Zorne provided project management.

CITY OF DIXON,ON-CALL MATERIALS TESTING SERVICES
Mr. Zorne is the project manager for this three-year contract, providing on-call Quality Assurance (QA) materials testing services to the City of Dixon. Our first task under this contract was to provide QA testing and observation services during the Valley Glen Offsite roadway and utility infrastructure project. The project consists of roadway, utility, and sidewalk, curb, and gutter improvements along West Cherry Street. Other projects under this contract include the Downtown Core Drainage Area improvement project and the Heritage Commons offsite improvements. Materials testing services include roadway subgrade Education
• MS, Civil Engineering
(Geotechnical),
California State
University, Sacramento
• BS, Civil Engineering,
California State
University, Sacramento
Registrations
• CA: Geotechnical
Engineer, No. 2636
• CA: Professional
Engineer, Civil, No.
60936
Certifications
• OSHA: 40-Hour

HAZWOPER
• OSHA: 8-Hour
Refresher
• Nuclear Density Gauge
DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 356 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey

JEREMY ZORNE, GE

QUALITY ASSURANCE MANAGER
and utility trench backfill compaction testing services, concrete sampling and testing, and aggregate base (AB)/hot mix asphalt (HMA) field and laboratory testing.

CITY OF SACRAMENTO,ON-CALL MATERIALS SAMPLING AND TESTING SERVICES Mr. Zorne is the current contract manager for on-call materials sampling and testing services for the City of Sacramento Public Works Department. This contract has included materials sampling and testing services for a variety of projects including 3rd and Broadway Urban Plaza; Land Park Water Main; the McKinley Village project; and more. All testing and inspection services under this contract are performed by certified materials technicians. Laboratory testing is conducted in our fully accredited laboratory.

CITY OF SACRAMENTO, DEPARTMENT OF PARKS AND RECREATION,ON-CALL GEOTECHNICAL ENGINEERING, MATERIALS

TESTING AND INSPECTION SERVICES
Mr. Zorne is currently managing our on-call for geotechnical engineering, and materials sampling and testing. Since 2016, we have provided services on task orders that include walkways stage areas, restroom improvements, shade structures, and landscape improvements. Mr. Zorne oversees the inspection and testing for soils, rebar, concrete, high strength bolt testing, and field welding for fabric shade canopy structures; subgrade inspections for concrete wall footings; and more. All services are conducted by certified materials technicians and inspectors, and testing is conducted in our fully accredited materials testing laboratory.

CITY OF LINCOLN, FLIGHTLINE DRIVE REHABILITATION
Mr. Zorne served as project manager for geotechnical testing and observation services during construction to test and observe FDR pavement area preparation, pulverization, mixing, compaction, and curing to verify conformance with our previously provided geotechnical report, the plans, and specifications. All work was performed by Geocon’s Caltrans certified materials technicians in conformance with local agency standards.

COUNTY OF AMADOR, PIONEER CREEK ROAD STORM DAMAGE REPAIR Mr. Zorne was the project manager for this project that included materials testing/inspection and coordinating and reporting directly to the County Project Manager and Resident Engineer. Severe winter storms in 2017 caused damage to many roadways in Amador County, including a landslide and slope failures on Pioneer Creek Road. The repairs included construction of a Mechanically Stabilized Earth (MSE) retaining wall, placing new embankment, and paving approximately 100 feet of Pioneer Creek Road to restore its functional use.

CITY OF RANCHO CORDOVA, WHITE ROCK ROAD IMPROVEMENTS
Many streets within the City of Rancho Cordova were in need of rehabilitation to enhance the pavement and increase driving comfort and safety. As part of the City’s Street Rehabilitation to extend the life of the pavement, Geocon provided QA materials testing services for the microsurfacing project on White Rock Road, from Zinfandel Drive to Data Drive, in Rancho Cordova. Mr. Zorne was the project manager over the quality assurance testing services that included laboratory compliance testing of microsurfacing aggregates/emulsion.

COUNTY OF PLACER, FORESTHILL ROAD/LOWER LAKE CLEMENTINE IMPROVEMENT Mr. Zorne managed geotechnical and materials testing services for the Foresthill Road/Lower Lake Clementine Improvement project which included road widening, horizontal curve correction, and new pavement structural sections. Geocon provided compaction testing services for engineered fill, subgrade soil, aggregate base (AB) and hot mix asphalt (HMA).

DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 357 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey

MARK REPKING, PG

MATERIALS LABORATORY MANAGER
Mr. Repking has 15 years of experience working on a wide variety of geotechnical and environmental projects throughout northern California.

He has substantial technical experience including geotechnical materials testing, drilling oversight, sample collection, site reconnaissance, footing and foundation inspection, soil and material inspection, laboratory sample analysis, and onsite consultation. Mr. Repking manages Geocon’s Northern CA laboratory and ensures that all tests are conducted under proper protocol and that the laboratory maintains its accreditations through USACE, AMRL, CCRL, DSA, and Caltrans.

CITY OF BRENTWOOD NON-POTABLE WATER DISTRIBUTION – PHASE III,

BRENTWOOD, CALIFORNIA
This project included the Installation of 2,500 linear feet of 12-inch PVC non-potable water main and 1,200 linear feet of 20-inch PVC potable water main. Geocon performed soil sampling and testing, NDFT on trench backfill, and as-needed laboratory testing during construction. This project falls under our current on-call agreement with the City of Brentwood to perform as-needed materials testing. Mr. Repking served as laboratory manager for the Geocon team for this project.

CITY OF BRENTWOOD, VINEYARDS AMPHITHEATRE, BRENTWOOD, CALIFORNIA Under our current on-call agreement, Geocon conducted a geotechnical investigation to observe the soil and geologic conditions that may impact site development for this proposed project. The project will include site development and construction of a new amphitheater and 8,000 square foot Barn. A wedding pavilion and two event center buildings are also planned. As of December 13, 2021, the City has been presented with a draft geotechnical investigation report. Mr. Repking supervised the geotechnical laboratory materials testing performed for our investigation/exploratory program.

CONTRA COSTA COUNTY ON-CALL GEOTECHNICAL ENGINEERING CONSULTING SERVICES, CONTRA COSTA COUNTY,

CALIFORNIA
Geocon has worked with Contra Costa County to perform on-call geotechnical engineering consulting materials testing, and environmental consulting services since 2005 and was recently awarded another three-year contract to perform on-call geotechnical consulting services based on our excellent track record of service. Mr. Repking is the lab manager overseeing materials testing. Under this agreement, Geocon performed a geotechnical investigation for a slope failure at Carquinez Scenic Drive, in Martinez, California. Mr. Repking supervised geotechnical materials testing for the investigation.

CITY OF PLEASANTON,ON-CALL GEOTECHNICAL ENGINEERING AND MATERIALS TESTING, PLEASANTON, CALIFORNIA Mr. Repking is the laboratory manager for current multi-year contract with the City of Pleasanton to provide geotechnical engineering and materials testing services. Tasks have included a geophysical survey of an historic cemetery; geotechnical engineering consultation services regarding significant ongoing settlements at bridge approaches on major roadways throughout the City; and a geotechnical investigation for new paving along Arroyo Mocho Trail and independent assurance testing for a Cold-in-Place Recycling Treatment project.

SOLANO COUNTY MATERIALS TESTING SERVICES FOR FEDERALLY-FUNDED PROJECTS, SOLANO COUNTY, CALIFORNIA Geocon is currently providing special inspection and material testing services for various federally-funded County projects. Projects have included the Vacaville-Dixon Bike Route Phase 5B, 2015 Roadway Preservation Project, Steiger Hill Road Slide Repair, Mankas Corner, Putah Creek Road and Dixon Avenue, Lake Herman and Cordelia Road, Pleasants Valley Road, and the 2017 Storm Damage Repair Projects. Mr.

Repking is the laboratory manager for this on-call contract.

Education
• BS, Geological
Sciences, San Diego
State University
Registrations
• CA: Professional
Geologist, No. 8569
Certifications
• Caltrans 105, 106, 125,
201, 202, 205, 216, 217,
226, 229, 231, 308, 375,
521
DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 358 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey

MARK REPKING, PG

MATERIALS LABORATORY MANAGER

CITY OF AMERICAN CANYON,ON-CALL GEOTECHNICAL SERVICES, AMERICAN CANYON, CALIFORNIA Mr. Repking is providing laboratory testing services under this contract for the City. Geocon was recently awarded a 5-year contract by the City of American Canyon to provide on-call geotechnical services on City capital improvement projects. Task orders under this contract have included: geotechnical testing services for the widening of Napa Junction Road at its intersection with State Route 29 and the widening of Newell Lane. Our testing for those projects was typically performed on subgrade, aggregate base, asphalt pavement, sidewalk, curb and gutter and new underground utilities along each roadway.

NAPA COUNTY ON-CALL GEOTECHNICAL ENGINEERING, MATERIALS TESTING, AND INSPECTION SERVICES, NAPA COUNTY,

CALIFORNIA
Geocon is providing on-call geotechnical, materials testing and inspection services under our second consecutive on-call contract with Napa County. Mr. Repking is currently providing laboratory testing services under this contract for the County. He has performed testing for a wide variety of projects under this on-call. Testing has included soils, concrete, and masonry.

YOLO COUNTY ON-CALL GEOTECHNICAL ENGINEERING AND MATERIALS TESTING SERVICES, YOLO COUNTY, CALIFORNIA Mr. Repking is providing laboratory testing services under this contract for the County. Geocon is performing geotechnical engineering and construction services for various roadway infrastructure improvement projects throughout the County. To date, we have provided innovative solutions for pavement rehabilitation using various technologies such as full-depth recycling (FDR) with chemical treatment, overlays, geotextiles, and materials testing and inspection in accordance with Caltrans specifications for more than 30 lane-miles of roadway construction.

CITY OF SACRAMENTO,ON-CALL MATERIALS SAMPLING AND TESTING, SACRAMENTO, CALIFORNIA Geocon is performing materials sampling and testing services for the City of Sacramento, Public Works Department under an on-call agreement. Since 2014, Geocon has provided materials testing services for the underground utilities and various roadways, including the 3rd and Broadway Urban Plaza, Land Park Water Main, and multiple phases of the McKinley Village and Natomas Meadows development projects.

All services are conducted by certified materials technicians and testing is conducted in our fully accredited materials testing laboratory, managed by Mr. Repking.

CITY OF ELK GROVE,ON-CALL CONSTRUCTION MANAGEMENT SERVICES, ELK GROVE, CALIFORNIA As part of a construction management team, Geocon is providing geotechnical engineering, quality assurance materials sampling and testing services for the City of Elk Grove. Since 2016, we have worked on over eight task orders for the City. Certified materials testing technicians conduct all services and we conduct testing in our multi-agency accredited Rancho Cordova materials testing laboratory. Our technicians provide QA testing, observation and inspection services in accordance with ASTM and Caltrans test procedures and the City’s Quality Assurance Program. Mr. Repking is the laboratory manager.

CITY OF RANCHO CORDOVA, MATERIALS TESTING AND INSPECTION SERVICES, RANCHO CORDOVA, CALIFORNIA As part of a pre-qualified construction management team, Geocon is providing quality assurance materials sampling and testing services for the City of Rancho Cordova, Department of Public Works. Since 2012, he has supervised numerous task orders for the City’s roadway, streetscape, trails, landscaping, utility, and infrastructure projects. Certified materials testing technicians conduct all field services and we conduct testing in our multi-agency accredited Rancho Cordova materials testing laboratory that Mr. Repking oversees. Mr. Repking provides laboratory management services for the QA testing, observation and inspection services in accordance with ASTM and Caltrans test procedures and the City’s Quality Assurance Program.

DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 359 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey

ANDRE ASHOUR, PE

SENIOR PROJECT ENGINEER
Mr. Ashour is a licensed Civil Engineer in the State of California with 15 years of extensive and diverse engineering experience. His geotechnical expertise includes shallow and deep foundation design, liquefaction analysis, shoring design, soil stabilization and mitigation methods, pavement design and rehabilitation, retaining wall design, geotechnical instrumentation and monitoring, rock and soil slope stability analysis, soil lab testing, observation of earthwork operations and geotechnical value engineering. Mr. Ashour is experienced in conducting geotechnical investigations for public works projects, private developments, commercial, industrial, power and energy and educational facilities.

CITY OF PLEASANTON, ON-CALL GEOTECHNICAL ENGINEERING AND MATERIALS TESTING SERVICES – 2020 SLURRY Geocon has provided on-call geotechnical, materials testing and construction inspection services to the City of Pleasanton under on-call agreements since 2011. Services performed include geotechnical engineering investigations; geotechnical consultation; geotechnical testing and observation; special inspections; materials testing; pavement coring; independent assurance testing and review for federally funded projects; and more. Mr. Ashour is a senior project engineer for the contract. His duties include project management, laboratory testing oversite and reporting. Under our current agreement, Geocon performed special inspections and materials testing for the City’s 2020 slurry seal placement project, which consisted of slurry seal placement on various City streets over a period of 15 days. Our technicians performed daily sampling of stockpiled aggregate materials, and observation of slurry operations, including preparation of the surfaces to receive slurry. Mr. Ashour performed engineering review.

CITY OF PLEASANTON, BRIDGES PMP
Geocon was retained by the City of Pleasanton through our current to provide geotechnical consultation in response to roadway settlement problems adjacent to pile-supported bridges that span over the Arroyo Mocho channel. Settlements had occurred along Hopyard Road, Stoneridge Drive, and Santa Rita Road in Pleasanton. Historically, the City addressed settlements with localized repairs and asphalt patches in the settled areas but the settlements in some locations have been exacerbated by unknown causes. Geocon reviewed site conditions and as-built drawings for the bridges to provide preliminary opinions on the conditions contributing to the settlement and general recommendations for designlevel geotechnical investigations. Geocon is now performing materials testing conducted for ongoing bridge maintenance (PMP) repairs including minor concrete repairs, HMA placement and approach slabs. Geocon’s field technicians are performing concrete placement observation and sampling, soil and AB compaction testing, and batch plant inspections. Concrete and soil samples are analyzed in Geocon’s in-house lab. Mr. Ashour is the senior project engineer for the PMP phase and is providing engineering review.

CITY OF BENICIA, 2020 MICROSURFACING PROJECT, BENICIA, CALIFORNIA Mr. Ashour is Geocon’s senior project engineer for this project under our current on-call agreement with the City of Benicia to perform geotechnical engineering and materials testing services. The project includes micro-surfacing on various city streets. Geocon’s field services included collection of aggregate and emulsion samples; verification of required spread rate; and observation of roadways for proper preparation and cleaning prior to micro-surfacing. All samples are transported to Geocon’s in-house materials testing laboratory for analysis.

Education
• MS, Civil Engineering,
California State Polytechnic
University, Pomona
• MS, Mining Engineering,
Azad University, Tehran
• BS, Geotechnical and
Mining Engineering, Azad
University, Markazi
Certifications
• CA: Professional Engineer,
Civil, No. 88145
DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 360 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey

ANDRE ASHOUR, PE

SENIOR PROJECT ENGINEER

CITY OF AMERICAN CANYON, JAMES ROAD REHABILITATION, AMERICAN CANYON, CALIFORNIA Geocon currently providing on-call geotechnical testing and observation services to the American Canyon under a 5-year agreement for various Capital Improvement Projects. Mr. Ashour is Geocon’s Senior Project Engineer assigned to this on-call. He performs engineering, project management, and field services, as-needed for tasks and projects under the on-call. Geocon recently performed geotechnical testing and observation for the James Road Rehabilitation project in the City of American Canyon. Project improvements included full depth reclamation (FDR), water main replacement, manholes, curb and gutter, and sidewalk along James Road between West American Canyon Road and Donaldson Way. Trench backfill depths were on the order of 5 to 7 feet for a new 8-inch water main.

Geocon’s inspectors and technicians performed observation of compaction of AB for sidewalk, curb, gutter and driveways, and in-place density testing.

GRIZZLY ISLAND ROAD RECONSTRUCTION, SOLANO COUNTY, CALIFORNIA Geocon is performing geotechnical testing and observation services for the reconstruction of Grizzly Island Road in Solano County, California. Grizzly Island Road is being reconstructed from Gray Hawk Lane to approximately 0.87 miles southward. The new Grizzly Island Road will consist of 12-ft-wide travel lanes with adjacent bike lanes in both the northbound and southbound directions. The pavement section for the new roadway will be 0.35’ of Type A HMA over 0.7’ of Class 2 Aggregate Base. Geocon is performing geotechnical observation, compaction testing and soil sampling during grading operations; compaction testing and quality control during aggregate base placement and asphalt paving operations; laboratory testing on imported fill materials, aggregate base and asphalt concrete; and as-needed geotechnical consultation during construction. Mr. Ashour is Geocon’s senior project engineer for this project.

SONOMA COUNTY TRANSPORTATION AND PUBLIC WORKS, BOYES BOULEVARD BRIDGE REPLACEMENT, SONOMA

COUNTY, CALIFORNIA
Under contract with The County’s Construction Manager, Geocon performed quality assurance (QA) materials testing services during construction of the new Boyes Boulevard Bridge over Sonoma Creek in Boyes Hot Springs. The previous structurally deficient bridge has been replaced with a new single- span, box girder bridge. New bridge abutments are supported by CIDH piles. The project will also include pavement reconstruction along Boyes Boulevard, River Road and Pine Avenue. Our scope services for this includes observation, testing and documentation during earthwork operations; observation of concrete placement and structural concrete testing; batch plant inspections; inspection and testing of high-strength bolts and post-installed anchors; material id and tag at local fabrication shops; and laboratory materials testing. Mr. Ashour performed project review and reporting.

CITY OF NEWARK CIVIC CENTER
Geocon performed design-level geotechnical investigation for the construction of a new Civic Center for the City of Newark. Our investigation was performed to observe soil and geologic conditions that may impact site development for the project as planned. At the time of our investigation, the site was occupied by the existing civic center including an administration building with a 7-story tower and an existing library facility. The administration building and a variety of site improvements have since been razed to accommodate the new civic center, which includes a new two-story city hall; two-story library; and police building. Geocon also performed geotechnical services during ground improvements consisting of design build document review, submittal review, shoring plan review, observation and inspection of all utility trench subgrade bottoms and foundation bottoms, observation and inspection of ground improvement systems, and observation of soil and/or aggregate placement. Mr. Ashour assisted with project management and reporting.

DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 361 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey

JACOB BISHOP-MOSER, PE

PROJECT ENGINEER
Mr. Bishop-Moser has seven years of experience conducting geotechnical testing and observation, construction materials testing, laboratory support, and geotechnical engineering services for a wide variety of projects throughout Northern California. Projects have included various transportation infrastructure improvements, publicworks facilities, k-12 and higher education buildings and campuses, large diameter water storage tanks, redevelopment sites, mid- and highdensity housing complexes, and commercial properties.

CITY OF BRENTWOOD, ON-CALL CONSTRUCTION INSPECTION AND MATERIALS

TESTING SERVICES
Mr. Bishop-Moser conducts project engineering and materials testing services under our current, subsequent on-call contract with the City of Brentwood. Geocon is currently providing geotechnical engineering and materials testing services for various projects throughout the City. Projects have included geotechnical engineering and testing/observation for improvements at Fairview Avenue and Fairview Court; improvements to the City of Brentwood Wastewater Treatment Plant; and roadway improvements along Lone Tree Way and other ancillary streets.

CITY OF PLEASANTON, ON-CALL GEOTECHNICAL ENGINEERING AND MATERIALS TESTING SERVICES - STANLEY BOULEVARD

RECONSTRUCTION
Geocon has provided materials testing, geotechnical engineering and consultation services for numerous projects for the City of Pleasanton under on-call agreements since 2011. Mr. Bishop-Moser is a project engineer assigned to our current on-call contract. Under this agreement, Geocon has provided geotechnical consultation services for numerous projects including the reconstruction of Stanley Boulevard between Main Street and First Street. Geocon performed field observation of earthwork activities; field compaction testing of subgrade, aggregate base (AB), asphalt materials, and utility trench backfill; observation of concrete placement; and associated laboratory testing for soils, AB and concrete.

Mr. Bishop-Moser performed soil compaction testing.

CITY OF PLEASANTON 2017 ANNUAL WATER MAIN REPLACEMENTS PLEASANTON, CALIFORNIA Geocon was retained by the City of Pleasanton through our current on-call contract to perform geotechnical testing services for the annual water main replacement along Main Street and Santa Rita Road. The project replaced approximately 3,400 linear feet of water main - The new water main is predominantly 12-inch C-900 PVC with minor amounts of ductile iron pipe. Our scope of services included compaction testing of pipe embedment materials (Pleasanton Fine Fill) and upper trench backfill (aggregate base) and associated laboratory testing. Pipe embedment and trench backfill was in accordance with the City Standard Detail 113 with exception to the upper trench backfill materials which were recycled Class 2 Aggregate Base. Mr. Bishop-Moser performed onsite soils testing.

SOLANO COUNTY, MATERIALS TESTING SERVICES FOR VARIOUS FEDERALLY-FUNDED COUNTY PROJECTS 2015, SOLANO

COUNTY, CALIFORNIA
Mr. Bishop-Moser provides materials testing and project management for our on-call agreement with the County of Solano, Department of Resource Management. Our services include quality assurance resting for construction of the County’s federally-funded projects. Materials testing services have been provided on the Travis Air Force Base South Gate, 2015 Roadway Preservation Project, Vacaville-Dixon Bike Route Phase 5B, safety improvements on Midway-Sievers, Pleasants Valley Road, and Dixon Avenue-Putah Creek, as well as the Suisun Valley Farm to Market project. The scope of work on these Education
• BS, Structural Engineering,
University of California, San
Diego
Registrations
• CA: Professional Engineer,
Civil, No. 91625
Certifications
• ACI Concrete Field-Testing
Technician 1, No 01290730
• Caltrans Certified Tester
• Nuclear Density Gauge
DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 362 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey

JACOB BISHOP-MOSER, PE

PROJECT ENGINEER
projects included field inspections, materials sampling and testing (field and lab), batch plant inspections, and source inspections.

CITY OF AMERICAN CANYON,ON-CALL MATERIALS TESTING SERVICES - 14” WATERLINE PIPE BURST Geocon is currently performing geotechnical services under a five-year agreement with the City of American Canyon for their various capital improvement projects. Under this agreement Geocon was contracted to conduct geotechnical field and laboratory testing during backfill of jacking and receiving pits for a 14-inch waterline pipe burst. The project involved the installation of a new 12-inch fusionwelded PVC main along the west side of state route 29. Approximately 30 installation or connection pits were proposed along the project alignment. Geocon’s nuclear gauge certified field technicians conducted testing and observation during backfill of the pits and observation during asphalt paving, and materials were tested in our accredited laboratory. Mr. Bishop-Moser performed onsite compaction testing and observation during trenching and grading operations.

CITY OF NAPA ON-CALL GEOTECHNICAL ENGINEERING AND MATERIALS TESTING SERVICES - TROWER AVENUE

PAVEMENT REHABILITATION
Geocon is providing on-call geotechnical engineering services to the City of Napa for their various capital improvement program projects. Mr. Bishop Moser is a project engineer for this contract and performs field inspections, materials testing, and engineering. Under this agreement, Geocon has assisted the City with a variety of roadway improvement projects that require Caltrans test-methods. For the Trower Avenue pavement rehab, Geocon conducted geotechnical testing and observation during the HMA overlay, which included 3,300 tons over a period of 5 days. Mr. Bishop Moser performed observation of concrete placement, testing and observation during grading, testing and observation during subgrade placement, and observation of earthwork operations.

NAPA COUNTY, ON-CALL GEOTECHNICAL ENGINEERING, MATERIALS TESTING, AND INSPECTION SERVICES – SILVERADO

TRAIL OVERLAY
Mr. Bishop-Moser is Geocon’s Project Engineer assigned to this on-call contract, performing as needed field investigations and materials testing under our third on-call contract with the County. Services have been provided on numerous projects including observation, testing and sampling during overlay activities on various county roads; geotechnical testing and environmental sampling (NOA) during construction of a soldier-pile retaining wall constructed for landslide mitigation; special inspections and testing for County building repairs and remodels; and more. Under our on-call, Geocon performed material testing services for the federally funded Silverado Trail Overlay (Phase H which included approximately 59,000 square feet of dig-out repairs and a subsequent 2-inch overlay of hot mix asphalt along the Silverado Trail and associated driveway entrances between St. Helena and Zinfandel Lane. Digout repairs consisted of the excavation of 4 inches of existing roadway section, and replacement with ¾- inch Type A asphalt. The overlay consisted of 2 inches of ½-inch Type A asphalt. Mr. Bishop-Moser conducted batch plant inspections and testing and observation of subgrade placement.

CITY OF UNION CITY, WHIPPLE ROAD PAVEMENT REHABILITATION (AMARAL TO ITHACA STREET) Mr. Bishop-Moser provided field services during the rehabilitation of Whipple Road in Union City. Geocon was retained by the Construction Management firm to provide materials testing (field and laboratory) during construction. The project consisted of wedge grinding, conform grinding, full-width mill to a depth of 1.5 inches, dig-outs, pavement repairs at various locations, 1.5” HMA overlay, and installation of thermoplastic pavement striping and markings. Minor sidewalk replacement, ramp retrofits, and utility adjustments were also included. All work was performed by Geocon’s Caltrans certified materials technicians in conformance with Caltrans Standard Specifications and project Special Provisions.

DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 363 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey

CHRISTOPHER MERRITT, PG

PROJECT GEOLOGIST/SPECIAL INSPECTOR
Mr. Merritt is a registered Geologist with over 20 of years of experience in the geo-environmental industry. He routinely conducts special inspections, materials testing, soils sampling, and environmental field services for a variety of clients including schools, transportation agencies, public agencies, and private entities.

CITY OF BRENTWOOD ON-CALL CONSTRUCTION INSPECTION AND MATERIALS TESTING SERVICES - 2017 PMP – SLURRY SEAL AND AC OVERLAY, BRENTWOOD,

CALIFORNIA
Geocon has provided the City of Brentwood with construction inspection, materials testing, and geotechnical engineering services under two consecutive contracts since 2014. Mr. Merritt performs asneeded materials testing and inspection services. Geocon was retained by the City to provide geotechnical testing and inspection services for the 2017 PMP – Slurry Seal and AC overlay project. Our services were provided during slurry seal, AC overlay and AC repairs. Mr. Merritt conducted asphalt concrete testing during overlay and repair operations.

CITY OF BRENTWOOD, NON-POTABLE WATER DISTRIBUTION SYSTEM, PHASE III,

BRENTWOOD, CALIFORNIA
Under our on-call agreement with the City of Brentwood, Geocon performed geotechnical testing and observation during construction for the Non-Potable Waste Distribution Project. The project involved the installation of approximately 2,500 linear feet of 12-inch PVC non-potable water main and 1,200 linear feet of 20-inch PVC potable water main and a variety of service stubs. Mr. Merritt performed observation of earthwork activities and soil compaction testing in the field.

CITY OF PLEASANTON ON-CALL MATERIALS TESTING AND GEOTECHNICAL ENGINEERING SERVICES - STANLEY BOULEVARD

RECONSTRUCTION, PLEASANTON, CALIFORNIA
Geocon is currently retained by the City of Pleasanton under an on-call contract to perform geotechnical engineering and materials testing services. Mr. Merritt provides as-needed testing and inspection services under this on-call contract. Under this agreement, Geocon has provided geotechnical consultation services for numerous projects including the reconstruction of Stanley Boulevard between Main Street and First Street. Geocon performed field observation of earthwork activities; field compaction testing of subgrade, aggregate base (AB), asphalt materials, and utility trench backfill; observation of concrete placement; and associated laboratory testing for soils, AB and concrete. Mr.

Merritt performed field testing for soils and AB.

CITY OF DUBLIN, ON-CALL GEOLOGIC AND GEOTECHNICAL SERVICES – STORM DRAIN IMPROVEMENTS, DUBLIN,

CALIFORNIA
Mr. Merritt performs as-needed field-testing, inspections, and observation services under our current on-call to perform geologic and geotechnical services for the City of Dublin. Under this on-call, Geocon performed a geotechnical investigation, as well as inspections and testing for the installation of two storm drain trash capture systems on Amador Valley Boulevard and Regional Street. Mr. Merritt performed soil compaction testing during construction activities. During the investigation, groundwater was encountered within the anticipated excavation depths for the vaults. Geocon recommend that the Education
• BS, Geology, James
Madison University,
Virginia
Registrations
• CA Professional
Geologist, No. 7156
Certifications
• ACI Concrete FieldTesting Technician 1,
No 01031463
• ICC: Reinforced
Concrete, No. 8340673
• ICC: Structural
Masonry, No. 8340673
• DSA: Masonry, No:
6148
• OSHA: 40-Hour

HAZWOPER
• OSHA: Annual
Refresher
• OSHA: HAZWOPER
Supervisor
• OSHA: Asbestos
Cement Pipe Removal
• Nuclear Density Gauge
DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 364 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey

CHRISTOPHER MERRITT, PG

PROJECT GEOLOGIST/SPECIAL INSPECTOR
project designer consider the potential for buoyant and hydrostatic forces acting on the vaults and special shoring or benching techniques be used during excavation.

COUNTY OF NAPA ON-CALL GEOTECHNICAL SERVICES - SHERIFF’S FACILITY REPAIRS, NAPA, CALIFORNIA Geocon has been awarded multiple on-call contracts by the County of Napa to perform on-call geotechnical, materials testing and inspection services. Our firm was selected services in 2011, which was renewed in 2014 and again in 2017. Our scope of services for this project included geotechnical consultation during repairs of the retaining wall subdrain system, and the removal and re-compaction of the wall backfill. As a special inspector/technician for the Geocon team Mr. Merritt performed soil compaction testing during earthwork operations.

CITY OF AMERICAN CANYON ON-CALL GEOTECHNICAL SERVICES - JAMES ROAD REHABILITATION, AMERICAN CANYON,

CALIFORNIA, AMERICAN CANYON, CALIFORNIA
Geocon currently providing on-call geotechnical services to the American Canyon under a 5-year agreement for various Capital Improvement Projects. Mr. Merritt performs observation of earthwork activities and onsite materials testing services. Our firm was most recently retained by the City to perform quality assurance testing and inspections for the James Road Rehabilitation project in the City of American Canyon. Project improvements included full depth reclamation (FDR), water main replacement, manholes, curb and gutter, and sidewalk along James Road between West American Canyon Road and Donaldson Way. Trench backfill depths were on the order of 5 to 7 feet for a new 8- inch water main. Geocon’s inspectors and technicians performed observation of compaction of AB for sidewalk, curb, gutter and driveways, and in-place density testing. Mr. Merritt conducted onsite soil compaction testing.

CITY OF AMERICAN CANYON, NEWELL DRIVE, AMERICAN CANYON, CALIFORNIA Under our on-call, Geocon performed geotechnical testing and observation for the installation of a new water main and roadway widening on Newell Drive. Our services included testing and observation of pipe bedding during construction of the water main; testing and observation during subgrade preparation and aggregate base; and testing and observation during asphalt paving. Geocon’s certified soil technicians performed onsite testing and inspections. Laboratory materials testing included Aggregate Gradation; Asphalt Binder Content; Hveem Density; Theoretical Max. Density; Stabilometer; and Air Voids. Mr. Merritt conducted onsite soil compaction testing.

CITY OF SANTA CRUZ, BAY STREET RESERVOIR WATER SUPPLY TANK, SANTA CRUZ, CALIFORNIA Geocon provided geotechnical testing and observation and materials testing and sampling during site development and construction for a new 6 million gallon above-ground water supply tank. Site geologic conditions warranted significant earthwork and the implementation of geogrid reinforced fill materials.

Mr. Merritt performed observation of concrete placement, prepared concrete samples for testing, and performed inspection of rebar placement.

CITY OF MOUNTAIN VIEW, MOFFETT GATEWAY WATER/SEWER MAIN REPLACEMENTS, MOUNTAIN VIEW, CALIFORNIA Geocon performed a geotechnical investigation for the replacement of water and sewer mains in the Boranda Avenue and Cuesta Drive area (Project 1) and State Route 85 near US Route 101 (Project 2) in Mountain View. The sewer main replacement project will replace sewer mains and associated laterals (approx. 4,600 feet of sewer main). The water main project will replace water mains, service laterals, fire hydrants, and associated water system appurtenances (approx. 7,300 feet of water main). The scope of our investigation included field exploration, laboratory testing, engineering analysis, and a final investigation report. Mr. Merritt performed field engineering for the investigation.

DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 365 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey

BILL BAUMBACH, CWI, ACI, ICC

SPECIAL INSPECTOR/CERTIFIED WELDING INSPECTOR
Mr. Baumbach has 15 years of materials testing and special inspection experience in Northern California. He has provided welding and inspection services for municipalities, transportation agencies, state agencies, school districts, and commercial and residential developments.

Mr. Baumbach is an AWS Certified Welding Inspector and holds multiple ICC certifications including, reinforced concrete, prestressed concrete, structural masonry, structural steel & bolting, structural welding, sprayapplied fireproofing, and PTI Level 2 post tensioning. Mr. Baumbach is also a Caltrans-certified field tester with extensive experience in Caltrans test methods and procedures.

CITY OF PLEASANTON, ON-CALL GEOTECHNICAL ENGINEERING AND MATERIALS

TESTING SERVICES, STANLEY BOULEVARD RECONSTRUCTION, PLEASANTON,

CALIFORNIA
Mr. Baumbach was a special inspector for the Geocon team for this project. Geocon was retained by the city, under our current on-call contract. The project involved the reconstruction of Stanley Boulevard between 1st Street and Santa Rota Road. The existing roadway section was demolished and replaced with reconstructed roadway consisting of rubberized hot mix asphalt over Type A hot mix asphalt over Class 2 aggregate base. Our scope of services included testing and observation services included compaction testing of subgrade, aggregate base, asphalt materials and utility trench backfill and associated laboratory testing, as well as sampling of fresh concrete and associated laboratory testing. Mr. Baumbach performed observation of field welding for light poles.

ZONE 7 WATER AGENCY, ON-CALL MATERIALS TESTING SUPPORT SERVICES, EAST BAY AREA, CALIFORNIA Geocon is currently under contract with Zone 7 to provide on-call materials testing support services.

Zone 7 has extended our contract for three consecutive years, since our award in 2015. Our services include materials testing for various public works projects including but not limited to, concrete, steel, shotcrete, and coatings; on-site field testing related to AC, paving, earthwork, and welding; oversight of contractors work; non-destructive testing (including, steel and stainless steel chemical tanks; and Ground Penetrating Radar (GPR) to locate rebar prior to coring or drilling. Representative projects to date that Mr. Baumbach performed inspection services for include the following:
• Del Valle Water Treatment Plant Clearwell Roof Replacement: Geocon provided field welding observation for the inspection of brackets and observation of epoxy anchor bolt installation. We also performed a visual inspection of post-welding activities for the Clearwell recoating, and observation of welding in progress for additional emergency repairs at the Water Treatment Plant. As a special inspector for the Geocon team, Mr. Baumbach performed field inspection and observation of welding. • Hopyard Well No. 6 and Stoneridge Well No. 1: Geocon performed special inspections and testing including field welding observations, observation of concrete placement, and concrete compressive strength testing in our laboratory.

COUNTY OF NAPA, ON-CALL GEOTECHNICAL ENGINEERING AND MATERIALS TESTING SERVICES, COUNTY

ADMINISTRATION BUILDING, NAPA, CALIFORNIA
Since 2011, Geocon has provided the County of Napa with geotechnical, materials testing, and inspection services under on-call agreements. Our services have been provided on numerous projects throughout the County including special inspections during repairs to the County Administration Education
• BS, Business, California
State University,
Sacramento
Certifications
• AWS: Certified Welding
Inspector, No.
13120651
• PTI: Level 2 Post
Tensioning, No.
6030719
• ACI: Concrete FieldTesting Technician,
Grade 1, No. 01035740
• ICC: Reinforced
Concrete, Structural
Masonry, Structural
Welding, Prestressed
Concrete, Structural
Steel & Bolting, Sprayapplied Fireproofing,
No. 5243002
• DSA: Masonry
Inspector, No. 5914
• Nuclear Gauge Training
• Caltrans: 504, 518, 533,
539, 540, 556, 557
DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 366 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey

BILL BAUMBACH, CWI, ACI, ICC

SPECIAL INSPECTOR/CERTIFIED WELDING INSPECTOR
Building due to the 2014 South Napa Earthquake. Structural repairs included new welds and weld repairs at select connections on the brace frame system that supported the building structure. Our team performed onsite observation of welding in progress, inspection of welded connections, and testing and inspection of fireproofing repairs. Mr. Baumbach performed field welding observation and fireproofing inspections.

CITY OF NAPA, FIRE STATION #5, NAPA, CALIFORNIA
Geocon is currently providing on-call geotechnical engineering services to the City of Napa for their various capital improvement program projects. Mr. Baumbach performed onsite testing and inspection during construction of the new Fire Station #5. The project included construction of a new 5,100-squarefoot fire station. Our scope of services included geotechnical testing and observation during site grading and improvements, foundation observations, observation of reinforced concrete placement, concrete testing, inspection of post-installed anchors, observation of field welding for drilled displacement pile shells, field and shop welding inspections, paint thickness and adhesion testing, and observation of shear wall nailing and truss placement.

CITY OF NAPA, GOODMAN LIBRARY RESTORATION, NAPA, CALIFORNIA Mr. Baumbach was a special inspector for the Geocon team for this project that was awarded to us under our on-call contract with the City. The historic library underwent repairs in 2017 after damages sustained during the South Napa Earthquake in 2014. The building had been yellow-tagged, leaving only a small office area in the back of the building usable. Restoration included the fabrication and installation of a steel frame structure secured inside the rebuilt tower. Our scope of services included structural welding, periodic inspection of high-strength bolting, inspection of structural masonry during grout injection, observation and testing of post-installed anchors, and visual inspection of wood trusses.

COASTSIDE FIRE STATION NO. 41, HALF MOON BAY, CALIFORNIA This project involved the design and construction of a for 2,425-square-foot, 30-foot-tall fire station facility. Geocon performed a geotechnical investigation including field exploration, laboratory testing, engineering analysis, and an investigation report in order to evaluate the subsurface soil and geologic conditions in the area of planned development. Geocon later performed special inspections and material testing during construction of the station. Our scope included inspection and testing for the reinforced concrete foundations and slab-on-grade for the fire station, reinforced concrete site retaining walls, reinforced masonry walls, field welding, wood framing, and roof nailing. Mr. Baumbach provided steel shop welding inspections and material identification at National Metal Fabricators in Stockton, California.

WM DAVIS, INTEGRATED WASTE PROCESSING FACILITY, SAN LEANDRO, CALIFORNIA Geocon performed special inspections and materials testing for the construction of a new, 65,000 sq. ft.

Integrated Waste Processing Facility at the WM Davis Facility, in San Leandro, California. The project included a 64,000-sf organic waste tip floor and processing facility plus a 9,000-sf two-story office with a second floor viewing gallery of the Material Recovery Facility (MRF) operations. Geocon performed observation of driven pile foundations and compaction testing on engineered fills and special inspections and testing for structural components including reinforced concrete mat foundations; high strength bolting; welded connections for the project push walls; and post-installed anchors. As a special inspector for the Geocon team, Mr. Baumbach performed onsite inspections of welding and bolting.

DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 367 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey

ROBERT DAIL

SPECIAL INSPECTOR
Mr. Dail has over 30 years of experience performing a variety of inspection and testing services during construction of public works and large commercial projects. He is Geocon’s Field Services Manager and oversees all testing and inspection projects throughout Northern California. Mr. Dail’s responsibilities include technician dispatch, coordination, testing, observing, inspecting and reporting of work in progress with respect to project plans and specifications, plan reading, writing daily reports, attending project-related meetings, and communicating effectively with project managers, engineers, architects and construction managers. Mr. Dail is certified through ACI and Caltrans (CTMs 105, 125, 231, 375, 504, 518, 533, 539, 540, 556, 557), with extensive experience in Caltrans test methods and procedures.

CITY OF BRENTWOOD, 2017-2018 PMP SLURRY SEAL AND OVERLAY PROJECTS, BRENTWOOD, CALIFORNIA Geocon is providing construction materials testing services to the City of Brentwood under a multi-year on-call contract. Since 2014 we have performed pavement coring and subgrade evaluation services at multiple locations throughout the City; geotechnical investigations for various projects; geotechnical testing and observation for the construction of City street repairs; and special inspection and materials testing services for City facility construction projects. For the 2017 and 2018 PMP projects Geocon performed pavement coring and subgrade evaluation services at multiple locations throughout the City.

Geocon conducted geotechnical testing and inspection during slurry seal, AC overlay and AC repairs; and the 2017 & 2018 PMP Coring and Subgrade Evaluations. For the subgrade evaluations, Geocon performed a materials investigation to evaluate pavement thickness and subgrade soils at 8 locations throughout the City. We worked closely with City officials to ensure services were provided in a responsive, thorough manner, completed at or under budget, and completed within the desired project timeframe. Mr. Dail performed field supervision and inspection observation.

JOHNNY CASH TRAIL AND BRIDGE, FOLSOM, CALIFORNIA
Geocon provided the original and supplemental geotechnical investigations for the project, which provides bicycle and pedestrian access across the new Folsom Lake Crossing Road to Folsom Lake near the Folsom Prison complex. We also provided geotechnical testing and observation services during earthwork construction of the bridge approach fill embankment, where Mr. Dail served as field services manager. The supplemental geotechnical investigation was conducted after completion of the embankment fill, when the bridge type and design configuration changed.

CITY OF DIXON, ON-CALL MATERIALS TESTING SERVICES, DIXON, CALIFORNIA Mr. Dail provides management and materials testing services under this contract. Geocon was awarded a three-year contract by the City of Dixon to provide on-call QA materials testing services.

Our first task under this contract was to provide QA testing and observation services during the Valley Glen Offsite roadway and utility infrastructure project. The project consists of roadway, utility, and sidewalk, curb, and gutter improvements along West Cherry Street. Other projects under this contract include the Downtown Core Drainage Area improvement project and the Heritage Commons offsite improvements. Materials testing services include roadway subgrade and utility trench backfill compaction testing services, concrete sampling and testing, and AB/HMA field and laboratory testing.

Certifications
• Caltrans 105, 125, 231,
375, 504, 518, 533, 539,
540, 556, 557
• ACI: Concrete Field
Testing Technician,
Grade 1, No. 01120093
• Nuclear Gauge Density
DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 368 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey

ROBERT DAIL

SPECIAL INSPECTOR

CITY OF RANCHO CORDOVA, MATERIALS TESTING AND INSPECTION SERVICES, RANCHO CORDOVA, CALIFORNIA As part of a pre-qualified construction management team, Mr. Dail provides quality assurance materials sampling and testing services for the City of Rancho Cordova. Since 2012, Mr. Dail has worked on 22 out of the 33 task orders for the City’s roadway, streetscape, trails, landscaping, utility, and infrastructure projects. He coordinates our certified materials testing technicians who conduct all field services and the testing in our multi-agency accredited Rancho Cordova materials testing laboratory. Mr. Dail provides QA testing, observation, and inspection services in accordance with ASTM and Caltrans test procedures and the City’s Quality Assurance Program.

CITY OF ELK GROVE, ON-CALL CONSTRUCTION MANAGEMENT SERVICES, ELK GROVE, CALIFORNIA As part of a construction management team, Geocon is providing geotechnical engineering, quality assurance materials sampling, and testing services for the City of Elk Grove. Since 2016, we have worked on over eight task orders for the City. Certified materials testing technicians conduct all services and we conduct testing in our multi-agency accredited Rancho Cordova materials testing laboratory. Our technicians provide QA testing, observation, and inspection services in accordance with ASTM and Caltrans test procedures and the City’s QA Program. Mr. Dail serves as the materials technician.

CITY OF SACRAMENTO, LAND PARK WATER MAIN REPLACEMENT PROJECT, PHASE I, SACRAMENTO, CALIFORNIA The Land Park Water Main Replacement project was part of the City of Sacramento’s Accelerated Water Meter Program, created to improve water conservation efforts within the City in response to the California drought. The project included the installation of new water main and connector pipe lines and landscape meters. Mr. Dail served as field services manager for compaction testing services under our on-call contract with the City of Sacramento, Public Works Department. Our services included observation of trench backfill placement, operations, and compaction. We performed inplace moisture and density testing of trench backfill to verify proper compliance.

SACRAMENTO SUBURBAN WATER DISTRICT, ON-CALL GEOTECHNICAL ENGINEERING AND MATERIALS TESTING AND

SPECIAL INSPECTIONS SERVICES, SACRAMENTO, CALIFORNIA
Mr. Dail serves as field services manager for the Sacramento Suburban Water District (SSWD). In 2017, Geocon began working with SSWD and in early 2018 was awarded an as-needed contract to provide geotechnical engineering and construction materials testing and special inspection services. Mr. Dail has provided observations and materials testing for the Parkland Estates Waterline, Marconi Office Upgrades, Edison Juliesse, Edison Meadows, Well N6A, Plover Main, and Jonas Main Replacement.

AMADOR WATER AGENCY, ON-CALL GEOTECHNICAL ENGINEERING AND MATERIALS TESTING AND INSPECTION SERVICES,

AMADOR COUNTY, CALIFORNIA
Geocon currently holds an on-call geotechnical services contract with Amador Water Agency (AWA).

Under this contract, Geocon has provided geotechnical engineering design, materials testing, and special inspection services during construction for over 10 AWA projects. Mr. Dail serves as Senior Materials Technician for this on-going contract with AWA.

DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 369 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey

BRAD ENGLUND

SPECIAL INSPECTOR
Mr. Englund is a certified special inspector and materials tester with 24 years of experience in the construction industry. Mr. Englund has provided inspection services on a wide variety of public and private projects, including public-works infrastruture and building improvements, school improvements and new construction, commercial developments, and large residential developments.

ZONE 7 WATER AGENCY, ON-CALL MATERIALS TESTING, PLEASANTON, CALIFORNIA Geocon is currently under contract with Zone 7 to provide on-call materials testing support services. Under our on-call agreement to perform material testing and special inspections, Geocon performed testing, inspection, and observation of concrete placement for the Zone 7 Stoneridge Well #1 Wall. Mr.

Englund observed concrete placement and cast concrete cylinders for testing in Geocon’s in-house laboratory. All samples were transported to our laboratory for compressive strength testing and results were reported to the Agency.

CITY OF DIXON, ON-CALL MATERIALS TESTING SERVICES, DIXON, CALIFORNIA Mr. England provides materials testing services under this contract. Geocon was awarded a three-year contract by the City of Dixon to provide on-call Quality Assurance (QA) materials testing services. One of our task orders under this contract was to provide QA testing and observation services during the Valley Glen Offsite roadway and utility infrastructure project. The project consisted of roadway, utility, and sidewalk, curb, and gutter improvements along West Cherry Street. Other projects have included the Downtown Core Drainage Area improvement project and the Heritage Commons offsite improvements.

Materials testing services include roadway subgrade and utility trench backfill compaction testing services, concrete sampling and testing, and aggregate base (AB)/hot mix asphalt (HMA) field and laboratory testing.

CITY OF RANCHO CORDOVA, MATERIALS TESTING AND INSPECTION SERVICES, RANCHO CORDOVA, CALIFORNIA As part of a pre-qualified construction management team, Mr. Englund provided quality assurance materials sampling and testing services for the City of Rancho Cordova, Department of Public Works.

Since 2012, Geocon has worked on over 30 task orders for the City’s roadway, streetscape, trails, landscaping, utility, and infrastructure projects. Certified materials testing technicians conduct all field services and we conduct testing in our multi-agency accredited Rancho Cordova materials testing laboratory. Mr. Englund provided QA testing, observation, and inspection services in accordance with ASTM and Caltrans test procedures and the City’s Quality Assurance Program.

CITY OF ELK GROVE, ON-CALL CONSTRUCTION MANAGEMENT SERVICES, ELK GROVE, CALIFORNIA Mr. Englund provides materials testing for the on-call construction management services for the City of Elk Grove. As part of a construction management team, Geocon is providing geotechnical engineering, quality assurance materials sampling, and testing services for the City of Elk Grove. Since 2016, we have worked on over eight task orders for the City. Certified materials testing technicians conduct all services and we conduct testing in our multi-agency accredited Rancho Cordova materials testing laboratory. Our technicians provide QA testing, observation, and inspection services in accordance with American Society for Testing and Materials (ASTM) and Caltrans test procedures and the City’s Quality Assurance Program.

Certifications
• ACI Concrete Field
Testing Technician 1,
No 01022751
• ICC Reinforced
Concrete, Structural
Masonry, No. 5223562
• Caltrans: 105, 504, 518,
533, 539, 540, 556, 557
• Nuclear Gauge
DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 370 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey

TIM MASSEY, CWI

CERTIFIED WELDING INSPECTOR
Mr. Massey is a Certified Welding Inspector (CWI), Special Inspector, Non-Destructive Testing and Destructive Testing Technician. He has 30+ years of experience performing field and shop welding inspection, nondestructive testing, and certificaition of welding procedures and operators. Mr. Massey has provided Quality Assurance (QA) and Quality Control (QC) inspection for number high-profile projects and agencies throughout Northern and Central California such as Sacramento Regional Transit District (RT), Bay Area Rapid Transit (BART), Caltrain, MUNI, and East Bay Municpal Utility District.

COASTSIDE FIRE STATION #41, GRANADA, CALIFORNIA
Geocon performed special inspections and material testing for the construction of the Fire Station #41. Our scope for the 2,425-squarefoot, 30-foot-tall facility included inspection and testing for the reinforced concrete foundations and slab-on-grade for the fire station, reinforced concrete site retaining walls, reinforced masonry walls, field welding, wood-framing, and roof-nailing, in general accordance with the project plans and 2016 California Building Code. Mr. Massey provided shop welding inspections at National Metal Fabricators in Stockton, California.

WM DAVIS, DAVIS STREET TRANSFER STATION, SAN LEANDRO, CALIFORNIA Geocon performed special inspections and material testing for the new Integrated Waste Processing Facility at the Waste Management Davis Street Transfer Station in San Leandro, California. Our team performed inspections of structural components, including reinforced concrete mat foundations, high strength bolting, welded connections for the project push walls, and post-installed anchors. Mr. Massey conducted observation of field welding in-progress.

ZONE 7 WATER AGENCY, ON-CALL MATERIALS TESTING SUPPORT SERVICES, HOPYARD ROAD PIPELINE REPAIR,

PLEASANTON, CALIFORNIA
Geocon is currently under contract with Zone 7 to provide on-call materials testing services. Zone 7 has extended our contract for three consecutive years, since our award in 2015. Our services include materials testing for various public works projects including but not limited to, concrete, steel, shotcrete, and coatings; field testing related to paving, earthwork, and welding; oversight of contractors work; non-destructive testing (including, steel and stainless steel storage tanks; and non-destructive testing. Mr. Massey provided field welding oversight, visual inspections of post-welding activities, and NDT inspections for the Hopyard Road Pipeline Repair Project. Geocon was retained by the Agency to perform field observation, inspections, and testing for the installation of a new 20-inch water main pipe and butterfly valve along Hopyard Road.

DELL VALLE WATER TREATMENT PLANT, FLUID STORAGE TANKS, LIVERMORE, CALIFORNIA Geocon performed non-destructive testing on fluid storage tanks at the Del Valle Water Treatment Plant. Our scope included visual inspections and wall thickness testing of 5 tanks ranging from 91 to 2,000 gallons in capacity. Each tank was paint-coated and in use at the time of our inspection so we performed ultrasonic testing (UT) to evaluate the thickness of only the outer wall of each tank. Upon completion of our inspections, recoating was recommended of one tank due to coating failure. We provided Zone 7 with a written report with testing results and recommendations. Mr. Massey performed onsite UT testing.

Education
• Cabbot College,
Welding Technology
• Contra Costa College,
Level II Ultrasonic
Testing & Welding
Metallurgy
• Contra Costa College,
Level II RT. MT, & PT –
1980-1982
Certifications
• AWS: Certified Welding
Inspector, No.
00030431
• Ultrasonic Testing
• Radiographic Testing
• Eddy Current Testing
• Mag Particle and
Penetrant Testing
DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 371 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey

TIM MASSEY, CWI

CERTIFIED WELDING INSPECTOR

PLACER COUNTY WATER AGENCY, ON-CALL GEOTECHNICAL ENGINEERING AND MATERIALS TESTING SERVICES, FOOTHILL

WATER TREATMENT PLANT, PACKAGE A
Under an on-call contract, Geocon supplements Placer County Water Agency’s (PCWA) Engineering Division to provide geotechnical engineering, materials testing and inspection for asphalt, concrete, and soil. Since 2008, Geocon has provided geotechnical, materials testing, and inspection services during design and construction on over 40 PCWA infrastructure projects such as pipelines, trunk lines, water mains, pump stations, recycled water facilities, hydroelectric facilities, water treatment facilities and storage tanks. Geocon has performed a variety of services at the Foothill Water Treatment Plant in Newcastle, ranging from quality assurance inspections and testing, onsite testing and observation services, and laboratory materials testing. The Package A project consisted of improvements to the plant, and Geocon performed as-needed special inspections and materials testing services during construction. Mr. Massey conducted observation of welding in progress (performed in the field). He also reviewed welder qualification records.

CITY OF NAPA ON-CALL GEOTECHNICAL, ENVIRONMENTAL, AND MATERIALS TESTING SERVICES, FIRE STATION #5,

NAPA, CALIFORNIA
Geocon is currently contracted with the City of Napa to provide geotechnical services for various capital improvement program projects. Under this agreement, Geocon provided special inspections and material testing during construction of the new, 5,100 sq. ft. Fire Station #5. Our scope included geotechnical testing and observation during site grading and improvements; foundation observations; observation of reinforced concrete placement; concrete testing; inspection of post-installed anchors; observation of field welding for drilled displacement pile shells; field and shop welding inspections; paint thickness and adhesion testing; and observation of shear wall nailing and truss placement. Mr. Massey provided observation of field welding in progress, and review of welder certifications and field welding procedures.

CITY OF NAPA, GOODMAN LIBRARY RESTORATION, NAPA, CALIFORNIA Mr. Massey was a special inspector for the Geocon team for this project that was awarded to us under our on-call contract with the City. The historic library underwent repairs in 2017 after damages sustained the 2014 earthquake. The building had been yellow-tagged, deeming only a small office area in the back of the building usable. Restoration included the fabrication and installation of a steel frame structure secured inside the rebuilt tower. Our scope of services included structural welding, periodic inspection of high-strength bolting, inspection of structural masonry during grout injection, observation and testing and of post-installed anchors, and visual inspection of wood trusses.

CITY OF ELK GROVE, ON-CALL MATERIALS TESTING SERVICES, NEW ELK GROVE ANIMAL SHELTER, ELK GROVE,

CALIFORNIA
Under our on-call agreement with the City of Elk Grove, Geocon provided geotechnical testing and observation materials testing, and special inspection services for the construction of a new, approximately 23,000 square-foot animal shelter building. The new building consisted of wood frame and concrete masonry construction supported on shallow footings. Other improvements included underground utility infrastructure, concrete flatwork, pavement, and landscaping. Mr. Massey provided shop welding inspections for this project.

DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 372 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey

CHARLES ARROYO, CWI, ACI, ICC

SPECIAL INSPECTOR/CERTIFIED WELDING INSPECTOR
Mr. Arroyo has over ten years of experience performing materials testing and special inspections experience. His certified categories include welding, fireproofing, masonry and bolting. Prior to his career as an inspector, he gained thirteen years of commercial welding and steel erection experience. Mr. Arroyo performs on and offsite oversight and inspections of welding (shop and field). His project experience includes both public and private construction projects.

CITY OF PLEASANTON, ON-CALL GEOTECHNICAL ENGINEERING AND MATERIALS

TESTING, THREE TANK REHABILITATION, PLEASANTON, CALIFORNIA Geocon has provided on-call geotechnical, materials testing and inspection services to the City of Pleasanton under on-call agreements since 2011. Geocon performed special inspections for the rehabilitation of three aboveground storage reservoirs within the City of Pleasanton’s water supply and distribution system. Rehabilitation of the tanks consisted of new coatings, cathodic protection systems and various metalwork including single-pass fillet welds that required visual inspection and radiographic testing. Mr. Arroyo conducted onsite visual welding inspections.

CITY OF ELK GROVE, ON-CALL MATERIALS TESTING, ELK GROVE ANIMAL SHELTER, ELK GROVE, CALIFORNIA Under our on-call agreement with the City of Elk Grove, Geocon provided geotechnical testing and observation materials testing, and special inspection services for the construction of a new, approximately 23,000 square-foot animal shelter building. The new building consisted of wood frame and concrete masonry construction supported on shallow footings. Other improvements included underground utility infrastructure, concrete flatwork, pavement, and landscaping. Mr. Arroyo provided field inspections for this project.

ZONE 7 WATER AGENCY, ON-CALL MATERIALS TESTING SERVICES, 4MG DOUGHERTY TANK, PLEASANTON, CALIFORNIA Geocon is currently under contract with Zone 7 to provide on-call materials testing services. Zone 7 has extended our contract for three consecutive years, since our award in 2015. Our services include materials testing for various public works projects including but not limited to, concrete, steel, shotcrete, and coatings; field testing related to paving, earthwork, and welding; oversight of contractors work; non-destructive testing (including, steel and stainless steel storage tanks; and non-destructive testing. Mr. Arroyo conducted field welding inspections for the 4MG tank project which consisted of roof repairs on a steel water tank reservoir.

CITY OF SACRAMENTO-PARKS AND RECREATION, ON-CALL GEOTECHNICAL ENGINEERING AND MATERIALS SAMPLING,

GARCIA BEND PARK, SACRAMENTO, CALIFORNIA
Geocon is providing on-call geotechnical engineering, and materials sampling and testing services for the City of Sacramento, Parks and Recreation Department’s public parks and trails. Since 2016, we have provided materials sampling and testing services on 9 task orders. Project elements have included walkway improvements, stage areas, restroom improvements, shade structures, and landscape improvements. Geocon has provided materials testing and special inspection for soil, concrete, high strength bolt testing and field welding for fabric shade canopy structures, subgrade inspections for concrete wall footings, inspections of footing rebar installation, and special Inspections as required by the engineer. Mr. Arroyo conducted field inspections for the Garcia Bend Park Restroom renovation, including inspection of epoxy anchors/rebar and field welding inspections.

Education
• AWS-CWI, Hobart
Institute of Welding
Certifications
• ACI Concrete Field
Technician
• ICC Structural
Steel/Welding
• ICC High Strength
Bolting
• ICC Structural Masonry
• ICC Spray Applied
Fireproofing
DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 373 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey

FRANCISCO GONZALEZ, EIT

SENIOR STAFF ENGINEER
Mr. Gonzalez provides geotechnical engineering, field testing and observation, construction materials testing, and laboratory support for a variety of projects throughout Northern California. Projects include educational facilities, transportation and water infrastructure, solar installations, and multi-family residential, mixed-use, and commercial developments.

CITY OF BRENTWOOD, ARMSTRONG ROAD & SAND CREEK ROAD PAVEMENT PMP

CORING, BRENTWOOD, CALIFORNIA
Since 2013, Geocon has provided construction materials testing services to the City of Brentwood under an on-call contract. One of the projects involved pavement coring and subgrade evaluation services at eight locations throughout the City. As a materials technician for the Geocon team under our on-call, Mr. Gonzalez performed laboratory testing for this project. AB and AC testing was performed in accordance with the latest Caltrans Standard Specifications.

CITY OF ORINDA, 2018 AND 2019 ANNUAL AND MEASURE J & L PAVEMENT

REHABILITATIONS,ORINDA, CALIFORNIA
Geocon was retained to perform geotechnical engineering services for the City’s 2018 and 2019 pavement rehabilitation projects. The rehabilitation programs combined include approximately 218 streets to be repaired. The scope of work consists of two types of pavement rehabilitation: Full Depth Reclamation, and Mill & Overlay. Geocon’s field activities have included coring at specified locations in the roadways, material testing, and proposed rehabilitation recommendations. Mr. Gonzalez has provided laboratory materials testing for the 2018 rehabilitation.

NAPA COUNTY PUBLIC WORKS DEPARTMENT, MATERIALS TESTING/INSPECTION & GEOTECHNICAL ENGINEERING SERVICES,

NAPA, CALIFORNIA
Mr. Gonzalez is part of the Geocon team for our third consecutive on-call contract with the County. He provides geotechnical engineering, field testing and observation, construction materials testing, and laboratory support for multiple projects under this agreement. Services have been provided on numerous projects throughout the County including projects requiring testing in accordance with Caltrans specifications and methodology. Under this on-call, Mr. Gonzalez performed field observation and testing for the Silverado Trail Overlay He observed paving operations and performed sampling of HMA in accordance with Caltrans test methods. The road-repair project involved an asphalt overlay on Silverado Trail from Zinfandel Lane to the St. Helena city limits. Services have been provided on numerous projects throughout the County including projects requiring testing in accordance with Caltrans specifications and methodology.

GREENWOOD AVENUE CULVERT REPLACEMENT, NAPA COUNTY, CALIFORNIA This project consisted of the replacement of the Greeenwood Avenue Culvert, in Calistoga, CA. The existing 60’ long, 15’ diameter corrugated metal culvert failed during a heavy storm event in 2014 and closed the road. The new bridge structure, completed in 2015, is an approximately 64’ long and 24’ wide prefabricated clear span concrete bridge. The construction of two new abutments supported by set concrete piles on either side were required as well. Geocon provided field observation, testing, and sampling; laboratory testing of concrete, aggregate base and import fill; and vibration monitoring during pile driving activities. Mr. Gonzalez performed field services and materials testing for this project.

Education
• MS, Engineering
Science, University of
the Pacific
• BS, Civil Engineering,
University of the Pacific
Registrations
• CA: Engineer-inTraining, No. 155396
Certifications
• ICC: Reinforced
Concrete, No. 9015311
• ACI Concrete Field
Testing Technician 1,
No 01349068
• Caltrans 105, 125, 231,
375
• Nuclear Density Gauge
DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 374 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey

ANGELINA CASTILLO

CONCRETE AND SOILS TECHNICIAN
Ms. Castillo has five years of experience as a materials technician. As a staff engineer for the Geocon team, Ms. Castillo’s responsibilities include laboratory materials testing, onsite inspections, and materials testing and observation for a variety of construction projects throughout northern California. Her experience includes various transportation projects, public facilities, essential services buildings, infrastructure improvement projects, redevelopment sites, mid and high-density housing complexes, commercial properties, and educational facilities. Her experience also includes environmental water quality monitoring.

CITY OF BRENTWOOD, ON-CALL CONSTRUCTION INSPECTION AND MATERIALS

TESTING SERVICES, BRENTWOOD, CALIFORNIA
Geocon is providing construction support, materials testing, and geotechnical engineering services to the City of Brentwood under our consecutive multi-year on-call with the City. Services include geotechnical investigations; geotechnical testing and observation during roadway and facility improvements and construction; special inspections for the construction and renovation to City structures; and materials testing for improvements of various buildings and streets throughout the City.

Ms. Castillo has performed laboratory testing for multiple projects under this on-call contract including the 2018 PMP Coring, 2017 Slurry Seal and AC Overlay and the 2018 Slurry Seal and AC Overlay. She also performed onsite observation and testing of earthwork operations for the 2018 PMP Coring project, and the CC Sherriff’s Delta Patrol Station Improvements.

CITY OF UNION CITY, WHIPPLE ROAD PAVEMENT REHABILITATION (AMARAL TO ITHACA STREET), UNION CITY,

CALIFORNIA
Geocon was retained by the Construction Management firm to provide materials testing (field and laboratory) during construction. The project consisted of a pavement rehabilitation project that included wedge grinding, conform grinding, full-width mill to a depth of 1.5 inches, dig-outs, pavement repairs at various locations, 1.5” HMA overlay, and installation of thermoplastic pavement striping and markings. Minor sidewalk replacement, ramp retrofits, and utility adjustments were also included. All work was performed by Geocon’s Caltrans certified materials technicians in conformance with Caltrans Standard Specifications and project Special Provisions. Ms. Castillo performed soils testing.

CITY OF PLEASANTON ON-CALL GEOTECHNICAL ENGINEERING AND MATERIALS TESTING SERVICES, PLEASANTON,

CALIFORNIA
Geocon has provided on-call geotechnical, materials testing and inspection services to the City of Pleasanton under on-call agreements since 2011. Services performed have included geotechnical engineering investigations; geotechnical consultation; geotechnical testing and observation; inspections and testing; pavement coring; independent assurance testing and review during for federally funded projects; and more. Ms. Castillo is a staff engineer/technician assigned to our current on-call agreement and conducts materials testing. Under our current contract, Geocon performed geotechnical testing and observation during the replacement of approximately 3,400 linear feet of water main in downtown Pleasanton. Our services included compaction testing of pipe embedment materials (Pleasanton Fine Fill) and upper trench backfill (aggregate base) and associated laboratory testing. Ms. Castillo performed soil compaction testing using nuclear density gauge and transported the samples to our laboratory for analysis. She then performed testing (in our in-house lab) for proctor and gradation analysis.

Education
• BS, Civil Engineering,
California State
University, Sacramento
Certifications
• ACI Concrete Field
Testing Technician 1,
No 01639534
• Caltrans 125, 231
• Nuclear Gauge
DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 375 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey

ANGELINA CASTILLO

CONCRETE AND SOILS TECHNICIAN

CITY OF DUBLIN, ON-CALL GEOTECHNICAL SERVICES, DUBLIN, CALIFORNIA Geocon is currently providing on-call geologic and geotechnical services for the City of Dublin. Under this on-call agreement, Geocon has performed a variety of geotechnical consultation services. Ms. Castillo is one of Geocon’s staff engineers assigned to this contract and performs engineering support and materials testing. Under this agreement, the City retained Geocon to conduct a geotechnical investigation and subsequent geotechnical testing and observation for the failing Alamo Creek Trail. We performed a geotechnical investigation to observe the soils conditions along the reach of Alamo Creek Trail and evaluate potential causes of distress along the trail. We recommended that the City remove existing trail pavements and replace them with asphalt concrete sections. Geocon was later contracted by the City to provide civil design services and geotechnical testing and observation services during construction. Ms. Castillo performed geotechnical laboratory testing.

ZONE 7 WATER AGENCY, ON-CALL MATERIALS TESTING SUPPORT SERVICES, ALAMEDA COUNTY, CALIFORNIA Geocon is currently under contract with Zone 7 to provide on-call materials testing support services.

Zone 7 has extended our contract for three consecutive years since our award in 2015. Our services include materials testing for various public works projects including but not limited to, concrete, steel, shotcrete, and coatings; on-site field testing related to AC, paving, earthwork, and welding; oversight of contractor work; non-destructive testing (including, steel and stainless steel chemical tanks; and Ground Penetrating Radar (GPR) to locate rebar prior to coring or drilling. Under our existing agreement Ms.

Castillo conducted in-house laboratory materials testing for the Hopyard Well No. 6 and Stoneridge Well No. 1 projects. Geocon’s complete scope consisted of special inspections and testing including field welding observations, observation of concrete placement, and concrete compressive strength testing in our laboratory. She also performed observation of concrete placement and concrete sapling for the COL 1 Facility stabilization project. Geocon performed materials testing services for drilled shaft foundations. Geocon’s materials testing services consisted of concrete and high strength grout testing.

SOLANO COUNTY PROFESSIONAL ENGINEERING SERVICES, SOLANO COUNTY, CALIFORNIA Since 2015, Geocon has provided professional geotechnical engineering and consulting services to the Solano General Services Department, Division of Capital Projects Management. Projects that Ms.

Castillo has performed field and laboratory testing for include the Solano County Fairgrounds AST and the Vacaville Veterans Center. The Fairgrounds AST project included a limited geotechnical investigation for an above-ground fuel tank relocation. Ms. Castillo performed soils laboratory testing. The Veterans Center project involved the construction of a new parking area, and Geocon conducted compaction testing on aggregate base during construction. Ms. Castillo performed onsite soil compaction testing.

CITY OF AMERICAN CANYON, JAMES ROAD REHABILITATION, AMERICAN CANYON, CALIFORNIA Geocon currently providing on-call geotechnical testing and observation services to the American Canyon under a 5-year agreement for various Capital Improvement Projects. Geocon recently performed geotechnical testing and observation for the James Road Rehabilitation project in the City of American Canyon. Improvements included full depth reclamation (FDR), water main replacement, manholes, curb and gutter, and sidewalk along James Road between West American Canyon Road and Donaldson Way. Trench backfill depths were on the order of 5 to 7 feet for a new 8-inch water main.

Geocon’s inspectors and technicians performed observation of compaction of AB for sidewalk, curb, gutter and driveways, and in-place density testing. Ms. Castillo performed testing and observation during subgrade/AC Placement, as well as laboratory materials testing in our Bay Area laboratory.

DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 376 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey BETHANY O’CONNOR

MATERIALS TECHNICIAN
Ms. O’Connor is a materials technician for the Geocon team. She performs field testing of soils and earthwork for projects throughout the Bay Area. She is a recent graduate of UC Santa Cruz, with a Bachelor’s Degree in Earth Sciences. Her experience at UC Santa Cruz also included an intern position for the Forest Ecology Research Plot, collecting field data to be utilized in a campus-wide database.

CITY OF BRENTWOOD, FAIRVIEW AVENUE PUMP STATION, BRENTWOOD,

CALIFORNIA
Geocon is currently providing the City of Brentwood on-call geotechnical engineering and construction inspection and materials testing services. We perform geotechnical engineering and testing services for roadway improvements; testing and observation for improvements of City facilities; materials testing for sewer rehabilitation projects; pavement coring and subgrade evaluation services throughout the City; and other as-needed testing and inspection for projects under the City’s Pavement Management Program. Under our current on-call, Geocon performed geotechnical testing and observation for the construction of a new pump station on Fairview Avenue in the City of Brentwood. Ms. O’Connor performed onsite geotechnical testing and observation.

CITY OF AMERICAN CANYON, JAMES ROAD REHABILITATION, AMERICAN CANYON, CALIFORNIA Geocon currently providing on-call geotechnical services to the American Canyon under a 5-year agreement for various Capital Improvement Projects. Under this agreement Geocon performed geotechnical testing and observation for the James Road Rehabilitation project in the City of American Canyon. Project improvements included full depth reclamation (FDR), water main replacement, manholes, curb and gutter, and sidewalk along James Road between West American Canyon Road and Donaldson Way. Trench backfill depths were on the order of 5 to 7 feet for a new 8-inch water main.

Geocon’s inspectors and technicians performed observation of compaction of AB for sidewalk, curb, gutter and driveways, and in-place density testing. Ms. O’Connor performed onsite geotechnical testing and observation.

LIVERMORE PLEASANTON FIRE DEPARTMENT (LPFD) STATION #3 REPLACEMENT, PLEASANTON, CALIFORNIA Geocon performed a design-level geotechnical investigation for this project which involves replacement of the existing LPFD Fire Station #3. At the time of our investigation, plans for the site included construction of a new 8,000 square foot, two-story fire station and associated site improvements including new driveways, exterior flatwork, underground utilities and landscaping. Geocon is now conducting performed geotechnical testing and observation for construction of the new station.

Earthwork operations at this site also includes remedial grading for undocumented fills noted during our investigation. Ms. O’Connor performed onsite geotechnical testing and observation.

CITY OF NEWARK CIVIC CENTER, NEWARK, CALIFORNIA
Geocon performed a design-level geotechnical investigation for the construction of a new Civic Center Building (civic center) in the City of Newark. At the time of our investigation, the site was occupied by the existing civic center that included an administration building with a 7-story tower and library facility.

The previous administration and site improvements have since been razed to accommodate the new civic center which includes a new city hall, library, and police building. Geocon provided the City with a report presenting the results of our investigation with conclusions and recommendations pertaining to the geotechnical aspects of the proposed project. We later conducted geotechnical testing and observation during ground improvements and reconstruction of the campus. Ms. O’Connor performed onsite geotechnical testing and observation.

Education
• BS, Earth Sciences, UC
Santa Cruz
Certifications
• ACI Concrete Field
Testing Technician No.
02096031
• Nuclear Density Gauge
DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 377 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey

1. COVER LETTER
APPENDIX B:

SAMPLE WORK PRODUCTS
• Daily Field Reports
• Final Compliance Letter
• Draft Geotechnical Investigation Report
DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 378 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey

1. COVER LETTER

DAILY FIELD REPORTS
DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 379 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 380 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 381 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 382 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 383 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey 4 + 3 tags
DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 384 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 386 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 387 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 388 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 389 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 390 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 391 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 392 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 393 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 394 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 395 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 396 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 397 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 398 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 399 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 400 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 401 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 402 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 403 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 404 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 405 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 406 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 407 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 408 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 409 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 410 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 411 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 412 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 413 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 414 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 415 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 416 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 417 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 418 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey PAGE: of
DAY OF WEEK:

DATE:

REPORT NUMBER:

PURPOSE OF VISIT: WELDING CONCRETE FIELD MEETING FIELD OBSERVATION/COMP$&7,217(67,1* NOTICE: The professional engineer is represented on site solely to observe operations of the contractor identified, form opinions about the adequacy of those operations, and report those opinions to the client. The presence and activities of the engineer's field representative do not relieve the contractor's obligation to meet contractual requirements. The contractor retains sole responsibility for site safety and the methods and sequences of construction PROJECT NAME: PROJECT NUMBER:

CLIENT - Contact: PHONE: PROJECT MANAGER: REVIEWED BY: FIELD TECHNICIAN:

GENERAL CONTRACTOR - PHONE: PROJECT BRIEFING:

YES
DATE:

BY:

NO – PREVIOUSLY

BRIEFED
GRADING CONTRACTOR - Foreman: PLANS AND SPECIFICATIONS TITLE:

EQUIPMENT WORKING AND TYPE OF COMPACTOR: BY: DATE:

WEATHER:

SOURCE OF FILL:

FOLLOW-UP INVENTORY:

DID YOU REVIEW A PREVIOUS FOLLOW-UP FIELD REPORT? YES NO N.A.

LIST REPORT NUMBERS WHERE FOLLOW-UP WAS SATISFIED BY THIS REPORT:

LIST REPORT NUMBERS STILL REQUIRING FOLLOW-UP:

WHAT IN PARTICULAR SHOULD BE OBSERVED, CHECKED, OR TESTED DURING NEXT VISIT? '2(67+,65(3257,'(17,)<'(),&,(1&<? YES NO ),(/'0(02 NUMBER V
:

Notes: (Describe work compOeted during the day, any problems, and their solutions) FIELD TECHNICIAN (PRINT): DATE: 5(*8/$5: 67$1'%<: LIST ON-SITE VISITORS:

SIGNATURE: CLIENT REPRESENTATIVE SIGNATURE:

FIELD REPORT
PHONE:
'2(67+,65(3257&/($535(9,286'(),&,(1&<" <(6 12 ),(/'0(02180%(5 V

SHOP/FIELD WELDING 1 rev.01.10.17
1 2
Monday
04/30/2018
✔
Camp Parks - ARC E8951-04-05
Moorefield Construction - Jeff Van Hosser S. Rodacker Bill Baumbach ✔
✔
✔
[Field Welding]
Arrived on site as requested for field welding inspection of 2nd floor deck. The puddle welding of deck is being done per plan note 2 on S-102C.

This welding is in process but has been completed from lines A to E/2 to 10. The crimping has not been done at this time. Deformed bars and Nelson studs have not been started at this time. The ledger to embed connections are not done at this time and are waiting for an RFI to verify how to proceed. Bent plate at top of wall roof deck supports are being tacked in place today. [High strength bolting
I am also on site for Skidmore testing of high strength bolts. I tested (3) sets of (3) 3/4" A325 TC bolt assemblies with Skidmore Wilhelm MS-13466 calibrated on 12/11/17. I tested the following (4) sets of assemblies and they passed inspection. Assemblies passed inspection of 28 kips requirement per AISC 360-16 Table J3.1. I tested the following assemblies 3/4x2-1/2 A325 TC 32, 30, 32 kips
3/4x2-1-4 A325 TC 31, 33, 41 kips
3/4x2 A325 TC 34, 32, 33 kips
3/4x1-3/3 A325 TC 37, 35, 34 kips
Bill Baumbach 04/30/2018
DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 419 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey of

AS BB PB V CCP BC PC UT IP

FB CC TA MT RW

FW DB TB DT RFU

PP GB PP

SNS GC TS

WNS SD JG
Complete Penetration Groove Weld
Flare Bevel Groove Weld
Fillet Weld
Partial Penetration Groove Weld
Member/Joint
Type
Weld/Connection
Type

WELD/CONNECTION TYPES
Arc Spot WeldShot Nelson StudWelded Nelson Stud
Quanity Plan Detail

SHOP/FIELD WELDING INSPECTION REPORT
Welder Name/Process Piece Mark N.D.T. Type Building Location Completion Status Ultrasonic TestingMagnetic Partical TestingDye Penetrant Testing N.D.T. Type
Visual

COMPLETION STATUS
Stud to Beam/Deck

MEMBER/JOINT TYPES
Plate to BeamPlate to ColumnTube Steel to AngleTube Steel to BeamPlate to PlateTube Steel to Tube SteelJoist to Girder Beam to Beam
CLIENT

REVIEWED BY

PROJECT NUMBER

PROJECT NAME

PROJECT LOCATION

REPORT DATE

REPORT NUMBER

ARCHITECT

ENGINEER
Gusset Plate to BeamGusset Plate to Column
PAGE
Beam to ColumnColumn to ColumnDeck to Beam
CompleteIn ProcessDeficient WeldDeficient Fit Up
SHOP/FIELD WELDING 2 rev.01.10.17
E8951-04-05 2 2
Camp Parks - ARCDublin, CAMoorefield Construction - Jeff Van Hosser 04/30/2018
Numerous AS DB Lines A to E/2 to 10 Deck V C Note 2/S-102C SMAW DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 420 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey

1. COVER LETTER

FINAL LETTER
DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 421 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey Project No. S1145-05-06
April 19, 2018
Tin-Wah Wong
Associate Landscape Architect
City of Sacramento
Department of Youth, Parks and Community Enrichment
Landscape Architecture Section
915 I Street, 3rd Floor
Subject: SUMMARY OF GEOTECHNICAL OBSERVATION, MATERIALS TESTING,

AND SPECIAL INSPECTION SERVICES

RICHFIELD PARK IMPROVEMENTS
1900 EXPEDITION WAY

SACRAMENTO, CALIFORNIA
Dear Ms. Wong:

In accordance with the Professional Services Agreement between Geocon and the City of Sacramento dated June 12, 2017, we provided geotechnical observation, materials testing, and special inspection services during construction of improvements at Richfield Park, 1900 Expedition Way in Sacramento, California.

This letter summarizes the results of our services.

SCOPE OF SERVICES
In accordance with Chapter 17 of the California Building Code (CBC), we provided special inspection and materials testing services during the period of December 8, 2017 through March 12, 2018. Specifically, we:
 Performed compaction testing on compacted aggregate base (AB) material placed in walkways and the picnic area,
 Observed concrete placement for walkways, measured temperature, slump and cast concrete test cylinders,
 Cured and tested concrete cylinder samples for compressive strength, and  Observed installation and tightening (snug-tight) of A325 high strength bolts.

We evaluated the degree of relative compaction and moisture content of AB by performing field inplace density tests. Testing was performed using nuclear testing equipment to obtain densities and moisture contents in accordance with American Society for Testing and Materials (ASTM) D6938 test procedure. Field test results were compared to referenced laboratory compaction curves prepared in accordance with ASTM D1557 to obtain the percent relative compaction. In-place density and laboratory test results are summarized in our field reports and retained in our files. The results of our in-place density testing indicate that the minimum relative compaction required for the project was generally met.

DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 422 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey Geocon Project No. S1145-05-06 - 2 - April 19, 2018
Concrete test specimens were fabricated during the concrete pour. Concrete cylinders were fabricated, transported, and cured in general accordance with ASTM C31 and were tested for compressive strength in general accordance with ASTM C39. Test results are attached to this letter.

CONCLUSIONS
Based on our testing and observations, it is our opinion that the observed work was performed in general conformance with the approved plans, specifications, applicable design professional revisions, and the applicable workmanship provisions of the CBC.

LIMITATIONS
We provided the requested testing and observation services on an on-call basis. Therefore, the conclusions contained herein pertain only to the work that we observed and/or tested. Our conclusions are based on conditions at the date of our last site visit, March 12, 2018. As used herein, the term "observation" implies only that we observed the progress of the work with which we agreed to be involved. Our services were performed in accordance with engineering principles and practices generally accepted at this time and location. We make no warranty, express or implied.

Please contact us if you have any questions regarding the contents of this letter or if we may be of further service.

Sincerely,
GEOCON CONSULTANTS, INC.

Jeremy J. Zorne, PE GE Richard C. Church, PE
Senior Engineer Project Engineer
Attachment: Concrete Compressive Strength Test Report
DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 423 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey DFR No.: of
Project Name: Project No.:

Project Address: Architect:

Engineer:

Mix Number:

Design Strength:

Structure:

Location of Sample:

Cast Date: Time:

Delivered By: Delv. Date: Time:

Admixture:

Reviewed By:

Engineer/Manager
Type of
Fracture/End
Proceedure
Client:

Supplier:

SET
Lab Technician Name:

Average 28-Day Compressive Strength:

Concrete Temp, ºF (C1064)(CTM 557):

Concrete Slump (C143)(CTM 556) (in.)

SAMPLE DATA
Cast By:

Ambient Temp, ºF:

LAB AND FIELD DATA FOR CYLINDRICAL 4 x 8" or 6 x 12" CONCRETE

SPECIMENS
Cement Factor (sk/cy):

Max Aggr. Size:

CLIENT
I.D. #
COMPRESSION TEST DATA (ASTMC39/CTM 521)
Truck Number
SAMPLE
I.D.#
Type 1 - Reasonably well-formed cones on both ends, less than 1" of cracking through caps. Type 2 - Well-formed cone on one end, vertical cracks running through caps, no well-defined cone on the other end. Type 3 - Columnar vertical cracking through both ends, no well-formed cones. Type 4 - Diagonal fracture with no cracking through ends. Type 5 - Side fracture at top or bottom (occurs commonly with unbonded caps). Type 6 - Similar to type 5 but end of cylinder is pointed.

Average 28-Day Compressive Strength Meets Approved Mix Design:

Average 28-Day Strength Percent(%) of Design:

Test Area
(in.²)
Maximum
Load (lbs)
Compressive
Strength
Age Test Date Dimensions, (in.) (psi)
Water Added At Site (gal):

Delivery Ticket No:

Unit Weight (C138)(CTM 518) (pcf)
Air Content,(C231)(CTM 504) (%):

Sampled By (C172)(CTM 539):

CONCRETE_FIELD_LAB 4 rev.01.10.17
Richfield Park
1900 Expedition Way
City of Sacramento - Robert Rueff
4 11
S1145-05-06
City of Sacramento
City of Sacramento
Teichert Readymix 1313126
45A504B1 0599
3000 5.0
Walkway 1"
Southern end of walkway
J. Albus 12/21/2017 10:45am
B. Englund 12/22/2017 4:00pm
44 Zyla
56 N/A

5.5 N/A
0 J. Albus
1 25412 7 12/28/17 3.98x8 12.44 24980 2010 3-pad
2 25413 28 01/18/18 3.98x8 12.44 46087 3710 3-pad
3 25414 28 01/18/18 3.99x8 12.50 46779 3740 3-pad
4 25415 28 01/18/18 3.99x8 12.50 46624 3730 5-pad
5 25416 H
3,730
Pass
124%
Jake Albus Richard Church, P.E.

DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 424 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey

1. COVER LETTER

GEOTECHNICAL

INVESTIGATION REPORT
DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 425 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey Vineyards Amphitheater
Vineyards Parkway
Brentwood, California

GEOTECHNICAL INVESTIGATION
PREPARED FOR:

CITY OF BRENTWOOD
150 CITY PARK WAY
BRENTWOOD, CALIFORNIA 94513
PREPARED BY:

GEOCON CONSULTANTS, INC.
6671 BRISA STREET
LIVERMORE, CALIFORNIA 94550
GEOCON PROJECT NO. E8689-04-14 DECEMBER 2021
DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey 6671 Brisa Street ■ Livermore, California 94550 ■ Tel (925) 371-5900 Project No. E8689-04-14
December 13, 2021
City of Brentwood
Public Works – Engineering
150 City Park Way
Brentwood, California 94513
Attention: Mr. Allen Baquilar
Subject: VINEYARDS AT MARSH CREEK
EVENT CENTER + AMPHITHEATER

VINEYARDS PARKWAY

BRENTWOOD, CALIFORNIA
CIP NO. 337-37231

GEOTECHNICAL INVESTIGATION

Dear Mr. Baquilar:

In accordance with your authorization of our Proposal No. LE-21-050, we have prepared this geotechnical investigation report for the subject project in Brentwood, California. Our investigation was performed to observe the soil and geologic conditions that may impact site development for the project as presently planned. The accompanying report presents the results of our investigation and conclusions and recommendations pertaining to the geotechnical aspects of the proposed project. The findings of this study indicate the site is suitable for development as planned provided the recommendations of this report are implemented during design and construction.

If you have any questions regarding this report, or if we may be of further service, please contact the undersigned at your convenience.

Sincerely,
GEOCON CONSULTANTS, INC.

Shane Rodacker, GE
Senior Engineer
Jacob Bishop-Moser, PE
Project Engineer
(1/e-mail) Addressee
Disclaimer: This DRAFT report is intended for the use of the project team to help with the on-going design of the project and is provided as a courtesy for review only. This DRAFT should not be relied upon for final design nor produced and submitted to regulatory agencies until a FINAL document is completed with the signature and stamps of the design professionals.

DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 427 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey

TABLE OF CONTENTS

1. PURPOSE AND SCOPE .................................................................................................................................... 1

2. SITE CONDITIONS AND PROJECT DESCRIPTION ............................................................................................ 1

3. GEOLOGIC SETTING ........................................................................................................................................ 2

4. GEOLOGIC HAZARDS....................................................................................................................................... 2

4.1 Faulting and Seismicity ....................................................................................................................... 2

4.2 Surface Fault Rupture ......................................................................................................................... 3

4.3 Ground Shaking................................................................................................................................... 3

4.4 Liquefaction......................................................................................................................................... 4

4.5 Tsunamis and Seiches ........................................................................................................................ 4

5. SOIL AND GROUNDWATER CONDITIONS........................................................................................................ 4

5.1 Fill......................................................................................................................................................... 4

5.2 Older Alluvium...................................................................................................................................... 4

5.3 Colluvium ............................................................................................................................................. 5

5.4 Meganos Formation ............................................................................................................................ 5

5.5 Groundwater........................................................................................................................................ 5

5.6 Soil Corrosion Screening ..................................................................................................................... 5

6. CONCLUSIONS AND RECOMMENDATIONS .................................................................................................... 6

6.1 General ................................................................................................................................................ 6

6.2 Seismic Design Criteria ....................................................................................................................... 6

6.3 Soil and Excavation Characteristics .................................................................................................... 8

6.4 Materials for Fill................................................................................................................................... 8

6.5 Grading ................................................................................................................................................ 8

6.6 Temporary Excavations .................................................................................................................... 10

6.7 Underground Utilities........................................................................................................................ 10

6.8 Shallow Foundations ........................................................................................................................ 11

6.9 Drilled Shaft Foundations................................................................................................................. 12

6.10 Retaining Wall Design ...................................................................................................................... 13

6.11 Interior Concrete Slabs-on-Grade..................................................................................................... 14

6.12 Moisture Protection Considerations................................................................................................. 14

6.13 Pavements........................................................................................................................................ 15

6.14 Exterior Slabs.................................................................................................................................... 16

6.15 Surface Drainage.............................................................................................................................. 17

7. FURTHER GEOTECHNICAL SERVICES......................................................................................................... 18

7.1 Plan and Specification Review......................................................................................................... 18

7.2 Testing and Observation Services.................................................................................................... 18

LIMITATIONS AND UNIFORMITY OF CONDITIONS

FIGURES
Figure 1, Vicinity Map
Figure 2, Site Plan
Figure 3, Site Development Plan

APPENDIX A – FIELD INVESTIGATION
Figure A1, Key to Boring Logs
Figures A2 through A17, Logs of Borings B1 through B16
Figures A18 through A28, Logs of Test Pits TP1 through TP11 APPENDIX B – LABORATORY TESTING
Table B-I, Summary of Laboratory Atterberg Limits Test Results Table B-II, Summary of Laboratory Expansion Index Test Results Table B-III, Summary of Laboratory Grain Size Analysis – No. 200 Wash Test Results Table B-IV, Summary of Laboratory Direct Shear Test Results Table B-V, Summary of Laboratory R-value Test Results
Table B-VI, Summary of Soil Corrosion Parameters
DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 428 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey TABLE OF CONTENTS (cont.)

Figures B1 through B10, Laboratory Grain Size Analysis Test Results Figures B11 through B16, Laboratory Swell/Collapse Potential Test Results

LIST OF REFERENCES
DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 429 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey Project No. E8689-04-14 - 1 - December 13, 2021

GEOTECHNICAL INVESTIGATION

1. PURPOSE AND SCOPE
This report presents the results of our geotechnical investigation for the new event center and amphitheater planned on the southwestern side of Vineyards Parkway in Brentwood, California. A Vicinity Map is presented as Figure 1. The purpose of this investigation was to evaluate the subsurface soil and geologic conditions in the area of planned development and provide conclusions and recommendations pertaining to the geotechnical aspects of project design and construction, based on the conditions encountered during our study.

The scope of this investigation included field exploration, laboratory testing, engineering analysis and the preparation of this report. Our field exploration was performed between August 11 and November 30, 2021 and included 11 exploratory test pits to maximum depths of approximately 10 ½ feet and 16 exploratory borings to maximum depths of approximately 29 ½ feet below existing grade at the site. The locations of the test pits and soil borings are depicted on the Site Plan, Figure 2. A detailed discussion of our field investigation, test pit logs, and boring logs are presented in Appendix A.

Laboratory tests were performed on selected soil samples obtained during the investigation to evaluate pertinent geotechnical parameters. Appendix B presents our laboratory test results in tabulated and graphic forms.

If project details vary significantly from those described herein, Geocon should be contacted to determine the necessity for review and possible revision of this report.

2. SITE CONDITIONS AND PROJECT DESCRIPTION
The irregularly shaped site is an assembly of five adjacent parcels on the southwestern side of Vineyards Parkway in Brentwood, generally south and east of the Vineyards Phase 5B residential subdivision. Contra Costa County APN Nos. 007-640-012 through -016 are assigned to the five parcels.

The project site is generally undeveloped and covered with grass. However, current site topography was shaped by previous grading activities in the mid-2000s. The site was originally a rolling hillside that sloped toward the Marsh Creek valley that bounds the southeast margin of the site. Ground surface elevations ranged from approximately 340 feet MSL at the southwestern corner of the site to approximately 170 feet MSL at the southeastern margin.

Post-grading, the site is characterized by a prominent east-facing hillside at the western margin, with large, relatively flat tiers below at elevations of around 220 to 230 feet MSL. Two graded swales direct runoff generally northward toward Vineyards Parkway. One swale is located below, and parallel to, the adjacent residential subdivision at the northwestern corner of the site. The other swale is situated behind the top of the tall, graded slope that descends to the Marsh Creek valley; this swale flows to a corrugated storm drain at the northeastern corner of the site, which presumably connects to existing storm drain infrastructure in Vineyards Parkway.

Vineyards Parkway was constructed with driveway returns at the north and east corners of the site. Current site topography is depicted on the Site Plan, Figure 2.

Mass grading began in early August 2005 with the construction of a long keyway along the southeastern margin of the site. From August into September 2005, grading continued with colluvium removals, subdrain construction and fill placement for the slope above the keyway and the area to the west. The referenced grading report indicates that three additional keyways were constructed: 1. A keyway along the southern margin of the site 2. A keyway within the slope that descends to Vineyards Parkway; and 3. A toe keyway for the fill slope that rises to the adjacent residential subdivision northwest of the site. A fourth keyway was started but not finished on the east-facing slope that ascends to the highest points of the site.

Subdrain lines were constructed within the keyways at the southern and southeastern margin, and at the bottom of the swale fill that progressed westward. These subdrains lines are interconnected and outlet toward Marsh DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 430 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey Project No. E8689-04-14 - 2 - December 13, 2021
Creek east of the site. A keyway subdrain was installed at the base of the fill slope for the adjacent homes and reportedly outlets to the swale that directs run-off to the northern corner of the site. No subdrain was reported within the keyway for the northern slope that descends to Vineyards Parkway. Approximate subdrain locations and spot elevations are shown on Figures 2 and 3.

Based on the current site layout concept (DLR Group, September 2021), the proposed project will consist of site development and construction of an amphitheater within the lower southern tier and an 8,000 square foot barn structure (Barn) with covered gathering area and entry canopy on the northern tier. A wedding pavilion is planned approximately 150 feet southeast of the entry canopy. Two future event center buildings are sited due west of the wedding pavilion, at the base of the east-facing slope.

Vehicular access off Vineyards Parkway will be provided at two points – one at the northern corner of the site and the other at the eastern corner. Underground utilities will be routed into the site at both driveway entrances.

Surface parking will be provided on the northern site tier. An emergency vehicle driveway will access the amphitheater along the top of the tall slope that descends to the Marsh Creek valley. A variety of exterior flatwork, landscaped areas, footpaths and amenity open spaces are also planned. Site grading for this project will be relatively minor, with design grades generally aligned with current topography. However, cuts of up to approximately 10 feet deep are planned for the Barn and adjacent gathering area. The proposed site layout is presented on the Site Development Plan, Figure 3.

3. GEOLOGIC SETTING
Brentwood is located within the western portion of the Great Valley Geomorphic Province of California, more commonly known as the Central Valley. The valley is a broad lowland between the Sierra Nevada to the east and Coast Ranges to the west. The Central Valley has been filled by a sequence of deep alluvial deposition derived from weathering processes in the Sierra Nevada and Coast Ranges. The weathering and subsequent deposition within the valley has resulted in alluvium that can be thousands of feet in thickness. The site lies with the hills that ascend from the western margin of the valley floor.

Available geologic mapping (see List of References) indicates the western margin of the site is underlain by Upper Cretaceous-age Deer Valley Formation materials, Pleistocene-age alluvial deposits mantle much of the northern portion of the site, and the remaining areas of the site are underlain by Eocene-age Meganos Formation materials. To the southeast of the site, the native soils adjacent to Marsh Creek are Holocene-age alluvium deposits.

4. GEOLOGIC HAZARDS

4.1 Faulting and Seismicity
Geologists and seismologists recognize the San Francisco Bay Area as one of the most seismically active regions in the United States. The significant earthquakes that occur in the Bay Area are associated with crustal movements along well-defined active fault zones that generally trend in a northwesterly direction.

The site and greater Bay Area are seismically dominated by the presence of the active San Andreas Fault System.

In the theory of plate tectonics, the San Andreas Fault System is a transform fault that forms the boundary between the northward moving Pacific Plate (west of the fault) and the southward moving North American Plate (east of the fault). Locally, the movement is distributed across a complex system of strike-slip, right lateral parallel and subparallel faults, which include the San Andreas, Hayward and Calaveras faults, among others.

The table below presents approximate distances to active faults in the site vicinity based on web-based mapping by the USGS and CGS. Site latitude is 37.8932° N, 121.7278° W.

DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 431 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey Project No. E8689-04-14 - 3 - December 13, 2021
TABLE 4.1

REGIONAL FAULT SUMMARY
Fault Name Approximate Distance to
Site (miles)
Maximum Earthquake
Magnitude, Mw
Great Valley 6 4 ¾ 6.8
Greenville 6 6.9
Clayton 7 6.9
Great Valley 5 10 ¾ 6.6
Los Medanos – Roe Island 12 ¼ 6.8
Los Positas 14 ¼ 6.4
Concord 14 ½ 6.6
Pleasanton 15 ¼ 6.6
Great Valley 7 15 ¾ 6.7
Calaveras 16 6.9
Contra Costa Shear Zone 20 ¾ 6.5
Green Valley 23 ¾ 6.8
Hayward – South 24 ¾ 7.3
Hayward – North 25 7.3
The faults tabulated and discussed above and numerous other faults in the greater Bay Area are sources of potential ground motion. However, earthquakes that might occur on other faults within the northern and central California area are also potential generators of significant ground motion and could subject the site to significant ground shaking.

Prior geologic studies indicate the Brentwood Fault crosses the site. The fault line generally trends northnorthwest to south-southeast. Site specific studies and those by the State of California for the Los Vaqueros Dam concluded the Brentwood Fault has not experienced movement in at least 40,000 to 75,000 years. Therefore, the fault is not considered active.

4.2 Surface Fault Rupture
The site is not within a currently established State of California Earthquake Fault Zone for surface fault rupture hazards. No active faults are known to pass directly beneath the site. By definition, an active fault is one with surface displacement within the last 11,000 years. A potentially active fault has demonstrated evidence of surface displacement with the past 1.6 million years. Faults that have not moved in the last 1.6 million years are typically considered inactive. As noted in the preceding section, the Brentwood Fault has not experienced movement in at least 40,000 years and is classified as potentially active by California Geological Survey definition. The potential for surface rupture in the area of the planned development, due to faulting occurring beneath the site, during the design life of the proposed development is considered low.

4.3 Ground Shaking
We used the USGS web-based Unified Hazard Tool to estimate the peak ground acceleration (PGA) and modal (most probable) magnitude associated with a 2,475-year return period that corresponds to an event with 2 percent chance of exceedance in 50 years. The USGS estimated PGA is 0.76g and the modal magnitude is 6.9 for Seismic Site Class C/D (Vs30 = 360 m/sec) based on a recent 2014 model within the application.

DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 432 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey Project No. E8689-04-14 - 4 - December 13, 2021
While listing PGA is useful for comparison of potential effects of fault activity in a region, other considerations are important in seismic design, including frequency and duration of motion and soil conditions underlying the site.

4.4 Liquefaction
The site is not located within a State of California Seismic Hazard Zone for liquefaction and interactive web-based mapping by USGS indicates the site soils possesses a “very low” susceptibility to liquefaction. Liquefaction is a phenomenon in which saturated cohesionless soils are subject to a temporary loss of shear strength due to pore pressure buildup under the cyclic shear stresses associated with intense earthquakes. Primary factors that trigger liquefaction are moderate to strong ground shaking (seismic source), relatively clean, loose granular soils (primarily poorly graded sands and silty sands), and saturated soil conditions (shallow groundwater). Due to the increasing overburden pressure with depth, liquefaction of granular soils is generally limited to the upper 50 feet of a soil profile.

Based on the cohesive nature of much of the materials that underly the site, the dense and hard nature of the formational materials that underlie the site, and the depth to groundwater, the potential for liquefaction occurring within the site soils is considered low.

4.5 Tsunamis and Seiches
The site is not located within a coastal area. Therefore, tsunamis (seismic sea waves) are not considered a significant hazard at the site.

Seiches are large waves generated in enclosed bodies of water in response to ground shaking. Marsh Creek Reservoir is down gradient from the project site. No major water-retaining structures are located immediately up gradient from the project site. Flooding from a seismically induced seiche is considered unlikely.

5. SOIL AND GROUNDWATER CONDITIONS

5.1 Fill
Our Borings B2, B5, B6, B8, B9, B10, and B12 through B16 and our Test Pits TP2 through TP7 and TP11 encountered fills placed during site grading performed in the mid-2000s. The fill materials were observed as loose to medium dense silty sands with variable amounts of clay and gravel, loose to dense clayey sands with variable amounts of gravels and occasional cobbles, medium stiff to very stiff silts with variable amounts of sand, clay and gravel, and soft to hard clays with variable amounts of sand, gravel, and silt and occasional cobbles, medium dense clayey gravels with silt and sand, and very dense sandy gravel. Maximum fill thicknesses were observed in our borings within the former swale fill that underlies the amphitheater area. Our Borings B6 and B12 encountered artificial fill to the maximum depths explored – approximately 20 and 29 ½ feet below existing grade, respectively. The referenced grading report indicates fill thickness up to approximately 40 feet exist within the amphitheater footprint, with thicker fills present at the top of the slope that descends toward Marsh Creek.

Our laboratory testing indicates the clayey soils within the fills that mantle portions of the site are expansive.

5.2 Older Alluvium
Our Test Pits TP6 and TP7 encountered Pleistocene-age alluvium beneath the existing fills and in our Boring B1 at grade. The older alluvium was observed as stiff to hard fat clays with variable amounts of sand and gravel. We encountered older alluvium in our soil boring and test pits at the site to the maximum depth explored – approximately 15 feet below grade. Our laboratory testing indicates the older alluvial soils are highly expansive.

DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 433 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey Project No. E8689-04-14 - 5 - December 13, 2021

5.3 Colluvium
Our Test Pits TP2 and TP3 encountered colluvial deposits beneath the existing fills and in our Test Pit TP1 at grade. The colluvium was observed as medium stiff to hard clays with variable amounts of silt, sand, and gravel.

We encountered colluvium in our test pits to maximum depths of approximately 9 ½ feet below grade.

5.4 Meganos Formation
Eocene-age Meganos Formation was encountered at-grade in Borings B3, B4, B7, B8 and B11 and Test Pits TP8 through TP10, in our Borings B2, B5,B8 through B10, and B13 through B16 and Test Pits TP4, and TP5 beneath the existing fills, and in our Test Pit TP1 beneath the existing colluvium. Meganos Formation materials were observed as stiff to hard clays with variable amounts of sand, silt and gravel and occasional cobbles, very stiff fat clays with sand, stiff silts with sand and clay, dense to very dense silty sands with clay, dense clayey sands with variable amounts of gravel, sandstone, siltstone, and claystone. Crystalline mineral deposits which appear to be gypsum were observed sporadically within the formational materials. We encountered Meganos Formation materials in our soil borings and test pits at the site to the maximum depth explored – approximately 24 ½ feet below grade.

5.5 Groundwater
Groundwater was not encountered during our field exploration. Historic high groundwater levels are not mapped by CGS at the site, but historic high groundwater levels immediately southeast of the site, in the Marsh Creek valley bottom, are less than 10 feet below natural grade.

Actual groundwater levels will fluctuate with variations in rainfall, temperature and other factors and may be higher or lower than observed during our study. Additionally, it is not uncommon for perched groundwater conditions to develop where none previously existed, especially in or atop fine-grained soils which are subjected to irrigation or precipitation.

5.6 Soil Corrosion Screening
Soil samples obtained during our field exploration were subjected to laboratory testing for minimum resistivity, pH, and chloride and water-soluble sulfate. The laboratory test results and published screening levels are presented in Appendix B. Soil corrosivity should be considered in the design of buried metal pipes, underground structures, etc.

Water-soluble sulfate test results on selected samples of site alluvial soils indicate an S0 exposure classification for sulfate attack on normal portland cement concrete (PCC) as defined in Chapter 318, Table 19.3.1.1 of the ACI Building Code Requirements for Structural Concrete. No special provisions are specified by ACI for S0 exposure classification soils. Based on the Caltrans’ criteria, the soils represented by our laboratory corrosion test results are not considered corrosive to foundation elements or buried metal. However, based on the resistivity values of the tested soils, the site soils indicate a higher propensity for corrosion.

Geocon does not practice in the field of corrosion engineering and mitigation. If corrosion sensitive improvements are planned, it is recommended that a corrosion engineer be retained to evaluate corrosion test results and incorporate the necessary precautions to avoid premature corrosion of buried metal pipes and concrete structures in direct contact with the soils.

DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 434 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey Project No. E8689-04-14 - 6 - December 13, 2021

6. CONCLUSIONS AND RECOMMENDATIONS

6.1 General

6.1.1 It is our opinion that neither soil nor geologic conditions were encountered during our investigation that would preclude the project as presently proposed.

6.1.2 Key geotechnical constraints to the project are the presence of deep artificial fills and expansive soils.

The soils and claystone materials within the area of the planned Barn and large parking lot are critically expansive Proper soil moisture conditioning, compaction, surface drainage, and slope protections are recommended to reduce the shrink-swell potential of the site soils. A layer of low-expansive material will be required beneath interior slabs-on-grade and exterior flatwork and rigid pavements.

6.1.3 The tall fill slope at the southeast margin of the site was graded during mass grading operations in 2005. Based on our review of current slope conditions, information in the referenced grading report, the soils conditions encountered in our subsurface explorations and our laboratory test results, the slope appears generally stable and the fill materials are well compacted. The slope has performed well over the past 15 years and exhibits no overt indications failure or sloughing. We did observe significant animal burrowing at the toe of the slope. Animal burrowing is destructive and can compromise the integrity of slopes as it fundamentally weakens the fill mass and provides potential conduits for surface water intrusion. From a geotechnical standpoint, consideration should be given to filling existing animal burrows and/or other deterrence measures.

6.1.4 Based on the observed soil conditions and the assumed structural loading, we anticipate that conventional shallow foundation systems consisting of strip footings can be used to support the proposed event center, amphitheater, Barn, and wedding pavilion structures.

6.1.5 Remedial grading will be required at the Barn, amphitheater and event center structures. Specific grading recommendations for each area are provided herein.

6.1.6 Post-construction settlement will be a function of foundation loading and the thickness of fill materials beneath each structure. Provided the site is graded in accordance with the recommendations of this report and foundation systems are constructed as described herein, we estimate that postconstruction settlements for the Barn and wedding pavilion will be less than approximately ¾ inch and corresponding differential settlement will be approximately ½ inch or less across a horizontal distance of 50 feet. Post-construction settlements for the amphitheater and event center buildings are estimated to be on the order of 1 ½ inches or less with corresponding differential settlement of approximately 1 inch or less across a horizontal distance of 30 feet. Final design foundation loadings should be reviewed by Geocon.

6.1.7 Geocon should be retained to provide geotechnical input and engineering support during project design. Any changes in the design, location or elevation of the proposed improvements, as outlined in this report, should be reviewed by this office. Geocon should be contacted to determine the necessity for review and possible revision of this report.

6.1.8 All references to relative compaction and optimum moisture content in this report are based on the latest edition of ASTM D1557.

6.2 Seismic Design Criteria

6.2.1 Seismic structural design will be performed in accordance with the provisions of the 2019 CBC which is based on the American Society of Civil Engineers (ASCE) publication Minimum Design Loads for Buildings and Other Structures (ASCE 7-16). We used the Structural Engineers Association of California web-based application Seismic Design Maps to evaluate site-specific seismic design DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 435 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey Project No. E8689-04-14 - 7 - December 13, 2021
parameters in accordance with the 2019 CBC and ASCE 7-16. Results are summarized in Table 6.2.1.

The values presented are for the risk-targeted maximum considered earthquake (MCER) and Seismic Risk Category II. We have assigned Site Class C to the Barn and wedding pavilion structures. Site Class D should be used for the amphitheater and event center structures.

TABLE 6.2.1
2019 CBC SEISMIC DESIGN PARAMETERS
Parameter Value Value 2019 CBC Reference
Site Class C D Section 1613.2.2
MCER Ground Motion Spectral Response
Acceleration – Class B (short), SS 1.568 g 1.568 g Figure 1613.2.1(1) MCER Ground Motion Spectral Response
Acceleration – Class B (1 sec), S1 0.548 g 0.548 g Figure 1613.2.1(2) Site Coefficient, FA 1.2 1.0 Table 1613.2.3(1)
Site Coefficient, FV 1.452 1.752 Table 1613.2.3(2)
Site Class Modified MCER Spectral
Response Acceleration (short), SMS 1.882 g 1.568 g Section 1613.2.3 (Eq. 16-36) Site Class Modified MCER Spectral
Response Acceleration – (1 sec), SM1 0.795 g 0.96 g Section 1613.2.3 (Eq. 16-37) 5% Damped Design
Spectral Response Acceleration (short), SDS 1.254 g 1.045 g Section 1613.2.4 (Eq. 16-38) 5% Damped Design
Spectral Response Acceleration (1 sec), SD1 0.53 g 0.64 g Section 1613.2.4 (Eq. 16-39) Note:

Per Section 11.4.8 of ASCE/SEI 7-16, a ground motion hazard analysis shall be performed for projects for Site Class “E” sites with Ss greater than or equal to 1.0g and for Site Class “D” and “E” sites with S1 greater than 0.2g.

Section 11.4.8 also provides exceptions where ground motion hazard analysis may be waived. Using the codebased values presented in the table above, in lieu of a performing a ground motion hazard analysis, requires the exceptions outlined in ASCE 7-16 Section 11.4.8 be followed in project design.

6.2.2 Table 6.2.2 presents additional seismic design parameters for projects located in Seismic Design Categories of D through F in accordance with ASCE 7-16 for the mapped maximum considered geometric mean (MCEG).

TABLE 6.2.2
2019 CBC SITE ACCELERATION DESIGN PARAMETERS
Parameter Value Value ASCE 7-16 Reference
Site Class C D Section 1613.2.2
Mapped MCEG Peak Ground Acceleration,
PGA 0.651 g 0.651 g Figure 22-7
Site Coefficient, FPGA 1.2 1.1 Table 11.8-1
Site Class Modified MCEG Peak Ground
Acceleration, PGAM 0.781 g 0.716 g Section 11.8.3 (Eq. 11.8-1)

6.2.3 Conformance to the criteria presented in Tables 6.2.1 and 6.2.2 for seismic design does not constitute any kind of guarantee or assurance that significant structural damage or ground failure will not occur if a maximum level earthquake occurs. The primary goal of seismic design is to protect life and not to avoid structural damage, since such design may be economically prohibitive.

DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 436 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey Project No. E8689-04-14 - 8 - December 13, 2021

6.3 Soil and Excavation Characteristics

6.3.1 The onsite soils can be excavated with moderate to heavy effort using conventional excavation equipment. We anticipate excavations in the fills or native formational materials at the site may generate oversize material (greater than 6 inches in nominal dimension) that should not be used in engineered fills.

6.3.2 It is the responsibility of the contractor to ensure that all excavations and trenches are properly shored and maintained in accordance with applicable Occupational Safety and Health Administration (OSHA) rules and regulations to maintain safety and maintain the stability of adjacent existing improvements.

6.3.3 Our laboratory testing indicates the site soils encountered in our field exploration are expansive (Expansion Index higher than 20) as defined by 2019 California Building Code (CBC) Section 1803A.5.3. Based on our experience in the area and laboratory test results, the recommendations herein reflect the presence of soils with moderate to very high expansion potential. In general, the site soils with very high expansion potential are present within the barn and entry canopy area and throughout the large parking lot to the northeast. Recommendations to mitigate the expansion potential of those soils are provided herein.

6.4 Materials for Fill

6.4.1 Excavated soils generated from cut operations at the site are suitable for use as engineered fill in structural areas provided they do not contain deleterious matter, organic material, or cementations larger than 6 inches in maximum dimension. However, excavated claystone materials and clayey alluvial soils may not be used as engineered fill in structural areas without lime-treatment or further review by Geocon.

6.4.2 Import and low-expansive fill material should be primarily granular with a “low” expansion potential (Expansion Index less than 50), a Plasticity Index less than 15, be free of organic material and construction debris, and not contain rock larger than 6 inches in greatest dimension. Low-expansive fill may also consist of aggregate base or lime-treated native soils. Laboratory testing should be performed to determine the required percentage of lime; for planning purposes approximately 6% quicklime by dry weight may be assumed.

6.4.3 Environmental characteristics and corrosion potential of import soil materials may also be considered.

Proposed import materials should be sampled, tested, and approved by Geocon prior to its transportation to the site.

6.5 Grading

6.5.1 All earthwork should be observed and all fills tested for recommended compaction and moisture content by representatives of Geocon.

6.5.2 Structural building pad areas should be considered as areas extending a minimum of 5 feet horizontally beyond the outside dimensions of buildings, including footings and overhangs carrying structural loads, where not restricted by property boundaries.

6.5.3 A preconstruction conference should be held at the site prior to the beginning of grading operations with the owner, contractor, civil engineer and geotechnical engineer in attendance. Special soil handling requirements can be discussed at that time.

6.5.4 Site preparation should commence with the stripping of any organic-laden near-surface soils and the removal of any existing improvements from the area to be graded and developed. All active or inactive DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 437 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey Project No. E8689-04-14 - 9 - December 13, 2021
utilities within the construction area should be protected, relocated, or abandoned. Any pipelines to be abandoned that less than 18 inches in diameter should be removed or filled with sand-cement slurry. Utilities larger than 18 inches in diameter should be removed. Excavations or depressions resulting from site clearing operations, or other existing excavations or depressions, should be restored with engineered fill in accordance with the recommendations of this report.

6.5.5 Where not removed by stripping operations, subgrade soils in the proposed building pad areas should be over-excavated as outlined below. Deeper over-excavations may be recommended during grading operations if soft soils, poorly compacted fills, or other unsuitable conditions are encountered. Specific grading recommendations for each building area and the planned parking lot are as follows:

Barn and Entry Canopy Area
Due to the presence of very highly expansive soils, we recommend that subgrade soils for the Barn pad and adjacent entry canopy and covered gathering area be over-excavated to approximately 5 feet below existing or proposed grade (whichever is lower). The over-excavated bottom should be limetreated to a depth of approximately 12 inches. Engineered fill, consisting of lime-treated native soils, should be placed and compacted in lifts to attain design subgrade elevation.

Amphitheater
We recommend that subgrade soils for the amphitheater pad be over-excavated to approximately 5 feet below existing or proposed grade (whichever is lower). The over-excavated bottom should be scarified to a depth of approximately 12 inches, moisture conditioned to at least 2% above optimum moisture contact and recompacted to at least 90% relative compaction. Engineered fill, consisting of over-excavated materials, should be placed and compacted in lifts to attain design subgrade elevation. The upper 12 inches of material below design subgrade should meet the requirements of Section 6.4.2.

Wedding Pavilion
Subgrade soils for the wedding pavilion pad should scarified to a depth of approximately 12 inches, moisture conditioned to near optimum moisture contact and recompacted to at least 90% relative compaction.

Event Center Buildings
We recommend that subgrade soils for the event center building pads be over-excavated to approximately 5 feet below existing or proposed grade (whichever is lower). The over-excavated bottom should be scarified to a depth of approximately 12 inches, moisture conditioned to at least 2% above optimum moisture contact and recompacted to at least 90% relative compaction.

Engineered fill, consisting of over-excavated materials, should be placed and compacted in lifts to attain design subgrade elevation. The upper 12 inches of material below design subgrade should meet the requirements of Section 6.4.2. Grading operations should result in at least 5 feet of new compacted fill materials across each building pad.

Parking Lot
Due to the presence of very highly expansive soils, we recommend that subgrade soils for the parking lot and associated driveways be over-excavated to approximately 1 foot below existing or proposed grade (whichever is lower). The over-excavated bottom should be lime-treated to a depth of approximately 12 inches. Engineered fill, consisting of lime-treated native soils, should be placed and compacted in lifts to attain design subgrade elevation.

6.5.6 Lime treatment may be implemented to utilize site soils as low-expansive fill and improve the durability of finished subgrade with the respect to wet weather conditions and construction traffic. For planning DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 438 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey Project No. E8689-04-14 - 10 - December 13, 2021
purposes, it should be assumed that soils will be treated with approximately 6% lime by dry weight.

The lime material should be Hi-Calcium quicklime and an in-place soil density of 120 pounds per cubic foot may be assumed. Lime-treatment should include two mixing periods with both mixes to the same depth. The second mixing should occur approximately 24 hours after initial mixing. Lime-treated soils should be compacted to at least 90% relative compaction. Comprehensive quality control testing should be implemented during lime treatment operations.

6.5.7 If grading commences in winter or spring, or in periods of precipitation, excavated and in-place soils may be wet. Earthwork contractors should be aware of potential compaction/workability difficulties.

The most effective site preparation alternatives will depend on site conditions prior to and during grading operations; we should evaluate site conditions at those times and provide supplemental recommendations, if necessary.

6.5.8 All engineered fill should be placed in layers no thicker than will allow for adequate bonding and compaction (typically 8 inches). Fill soils should be placed, moisture conditioned to at least 2% above optimum moisture content (near optimum if sand or gravel) and compacted to at least 90% relative compaction. Fill areas with in-place density tests showing moisture contents below those recommended herein will require additional moisture conditioning, processing and recompaction prior to placing additional fill or constructing overlying improvements.

6.6 Temporary Excavations

6.6.1 We anticipate that the majority of the site soils will be classified as Cal-OSHA “Type B” soil when encountered in excavations during site development and construction. If active seepage, loose gravelly or sandy soil, or poorly compacted fills are encountered, the Cal-OSHA classification should be downgraded to “Type C”. Excavation sloping, benching, the use of trench shields, and the placement of trench spoils should conform to the latest applicable Cal-OSHA standards. The contractor should have a Cal-OSHA-approved “competent person” onsite during excavation to evaluate trench conditions and make appropriate recommendations where necessary.

6.6.2 All onsite excavations must be conducted in such a manner that potential surcharges from existing structures, construction equipment, and vehicle loads are resisted. The surcharge area may be defined by a 1:1 projection down and away from the bottom of an existing foundation or vehicle load.

Penetrations below this 1:1 projection will require special excavation measures such as sloping and possibly shoring.

6.6.3 It is the contractor’s responsibility to provide sufficient and safe excavation support as well as protecting nearby utilities, structures, and other improvements which may be damaged by earth movements.

6.6.4 Temporary excavations such as utility trench sidewalls within site soils should remain near vertical to depths of at least 4 feet below ground surface, although some sloughing and caving may occur, particularly if clean sandy or gravelly soils, poorly compacted fills or groundwater are encountered.

Excavations greater than approximately 4 feet in height or those that are surcharged by adjacent traffic or structures may require sloping or shoring measures in order to provide a stable excavation.

6.6.5 Temporary excavations should be protected from rainfall and erosion. Surface runoff should be directed away from excavations or slopes.

6.7 Underground Utilities

6.7.1 Underground utility trenches should be backfilled with properly compacted material. The material excavated from the trenches should be adequate for use as backfill provided it does not contain DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 439 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey Project No. E8689-04-14 - 11 - December 13, 2021
deleterious matter, vegetation or rock larger than six inches in maximum dimension. Trench backfill should be placed in loose lifts not exceeding eight inches and compacted to at least 90% relative compaction at least 2% above optimum moisture content (near optimum if sand or gravel).

6.7.2 Bedding and pipe zone backfill typically extends from the bottom of the trench excavations to a minimum of six inches above the crown of the pipe. Pipe bedding material should consist of crushed aggregate, clean sand or similar open-graded material. Proposed bedding and pipe zone materials should be reviewed by Geocon prior to construction; materials such as ¾-inch drain rock may require wrapping with filter fabric to mitigate the potential for piping. Bedding and backfill should also conform to the requirements of the governing utility agency.

6.7.3 Utility trenches backfilled with granular material (including pipe bedding material) may serve as conduits for groundwater and may cause pumping, seepage or other undesirable effects at the lower ends of trench lines. Consideration should be given to constructing “trench plugs” at periodic intervals along utility line alignments to reduce those potential problems. Trench plugs should be located where the utility trench enters the perimeter of a structural area. Trench plugs may consist of compacted native clay soil or concrete. Trench plug material should completely surround the pipe and be in contact with the undisturbed walls and bottom of the trench. The length of soil trench plugs should be on the order of one to two feet. The geotechnical engineer should review the placement and design of trench plugs prior to plan finalization.

6.8 Shallow Foundations

6.8.1 Foundations for the new buildings and ancillary site improvements may consist of continuous strip footings founded in competent formational materials and/or properly compacted fill. Over-excavations or other provisions may be required if loose or unstable soils or other unsuitable conditions are encountered during footing excavations. Columns supporting the planned canopies at the Barn and amphitheater may utilize drilled shafts for foundation support per the recommendations of Section

6.9. Barn, Amphitheater, Event Center Buildings and Minor Site Structures Continuous footings have a minimum embedment depth of 24 inches below lowest adjacent pad grade. The footings should be at least 12 inches wide. Perimeter footings for the new buildings should consist of continuous strip footings embedded at least 24 inches below lowest adjacent grade. Any spread footings should be at least 4 feet square and founded at least 24 inches below lowest adjacent pad grade and integral with strip footings.

Footings proportioned as recommended may be designed for an allowable soil bearing pressure of 2,500 pounds per square foot (psf). The allowable bearing pressure is for dead + live loads may be increased by up to one-third for transient loads due to wind or seismic forces.

The allowable passive pressure used to resist lateral movement of the footings may be assumed to be equal to a fluid weighing 250 pounds per cubic foot (pcf). The allowable coefficient of friction to resist sliding is 0.30 for concrete against soil. Combined passive resistance and friction may be utilized for design provided that the frictional resistance is reduced by 50%. Where not protected by flatwork or pavement, the upper 1 foot of soil should be neglected when calculating passive resistance to lateral loads
Minimum reinforcement for continuous footings should consist of four No. 5 steel reinforcing bars; two placed near the top of the footing and two near the bottom. Reinforcement for spread footings should be designed by the project structural engineer.

DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 440 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey Project No. E8689-04-14 - 12 - December 13, 2021
Wedding Pavilion
Continuous footings should be at least 12 inches wide with a minimum embedment depth of 18 inches below lowest adjacent pad grade. Perimeter footings for the structure should consist of a continuous strip footing. Any spread footings should be at least 4 feet square and founded at least 18 inches below lowest adjacent pad grade.

Footings proportioned as recommended may be designed for an allowable soil bearing pressure of 4,000 pounds per square foot (psf). The allowable bearing pressure is for dead + live loads may be increased by up to one-third for transient loads due to wind or seismic forces.

The allowable passive pressure used to resist lateral movement of the footings may be assumed to be equal to a fluid weighing 350 pounds per cubic foot (pcf). The allowable coefficient of friction to resist sliding is 0.35 for concrete against soil. Combined passive resistance and friction may be utilized for design provided that the frictional resistance is reduced by 50%. Where not protected by flatwork or pavement, the upper 1 foot of soil should be neglected when calculating passive resistance to lateral loads
Minimum reinforcement for continuous footings should consist of four No. 4 steel reinforcing bars; two placed near the top of the footing and two near the bottom. Reinforcement for spread footings should be designed by the project structural engineer.

6.8.2 Underground utilities running parallel to footings should not be constructed in the zone of influence of footings. The zone of influence may be taken to be the area beneath the footing and within a 1:1 plane extending out and down from the bottom edge of the footing.

6.8.3 The foundation subgrade should be sprinkled as necessary to maintain a moist condition without significant shrinkage cracks as would be expected in any concrete placement. Prior to placing rebar reinforcement, foundation excavations should be evaluated by our representatives for appropriate support characteristics and moisture content. Moisture conditioning may be required for the materials exposed at footing bottom, particularly if foundation excavations are left open for an extended period.

6.9 Drilled Shaft Foundations

6.9.1 Cast-in-place, straight shaft concrete piers may be used to support the planned canopies at the Barn and amphitheater. Drilled shaft foundations should have a minimum center-to-center spacing of at least three pier diameters. Pier embedment depths and reinforcing should be specified by the project structural engineer. Specific recommendations for the piers in each area are as follows.

Barn and Entry Canopy
Reinforced concrete piers should have a minimum diameter of 24 inches and minimum embedment depth of 5 feet. The upper 2 foot of soil should be neglected when calculating for vertical capacities.

Allowable skin friction to resist axial compression loads may be taken as 300 psf to a depth of 6 feet below pad grade, and 400 psf below a depth of 6 feet. For uplift capacity, allowable skin friction may be assumed to be ⅔ of that in compression. Piers extending at least 7 feet below pad grade may utilize an allowable end bearing pressure of 4,000 psf. End bearing and skin friction may be used in combination provided that skin friction contribution is ignored in the pier length equivalent to the pier diameter, measured from the bottom of the pier. End bearing contribution to axial capacity may be increased by ⅓ when considering transient wind or seismic loads.

Allowable passive pressure used to resist lateral movement may be assumed to be equal to a fluid weighing 300 pcf to a depth of 7 feet and 500 pcf below. Allowable passive pressure may be applied over two pier diameters. Where not protected by pavement, passive resistance should be ignored for the upper 1 foot of site soils.

DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 441 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey Project No. E8689-04-14 - 13 - December 13, 2021
Amphitheater
Reinforced concrete piers should have a minimum diameter of 24 inches and minimum embedment depth of 8 feet. The upper 2 foot of soil should be neglected when calculating for vertical capacities.

Allowable skin friction to resist axial compression loads may be taken as 300 psf. For uplift capacity, allowable skin friction may be assumed to be ⅔ of that in compression. End bearing contribution should be ignored.

Allowable passive pressure used to resist lateral movement may be assumed to be equal to a fluid weighing 300 pcf. Allowable passive pressure may be applied over two pier diameters. Where not protected by pavement, passive resistance should be ignored for the upper 1 foot of site soils.

6.9.2 Pier excavations should be clear of loose soil, debris, and standing water prior to placing reinforcing steel. Although not expected, temporary casings may be needed if caving conditions are encountered.

The geotechnical engineer (a representative of Geocon Consultants, Inc.) should continuously observe drilling operations and concrete placement for the piers.

6.10 Retaining Wall Design

6.10.1 Lateral earth pressures may be used in the design of permanent retaining walls and buried structures.

Lateral earth pressures against these facilities may be assumed to be equal to the pressure exerted by an equivalent fluid. The unit weight of the equivalent fluid depends on the design conditions. Table

6.10 summarizes the weights of the equivalent fluid based on the different design conditions.

Retaining wall and structure backfill should meet the requirements of Section 6.4.2.

TABLE 6.10

RECOMMENDED LATERAL EARTH PRESSURES
Condition Equivalent Fluid Density
Active 35 pcf
At-Rest 55 pcf

6.10.2 Unrestrained walls should be designed using the active case. Unrestrained walls are those that are allowed to rotate more than 0.01H (where H is the height of the wall). Walls restrained from movement such as basement walls or underground utility vaults should be designed using the at-rest case. The above soil pressures assume level backfill under drained conditions within an area bounded by the wall and a 1:1 plane extending upward from the base of the wall and no surcharges within that same area. Unless project-specific loading information is provided by the structural engineer, where typical vehicle loads are expected behind a retaining wall, an additional uniform surcharge pressure equivalent to 2 feet of backfill soil should be used for design.

6.10.3 Unless hydrostatic conditions are incorporated into design, retaining walls greater than 2 feet tall (retained height) should be provided with a drainage system adequate to prevent the buildup of hydrostatic forces and should be waterproofed as required by the project architect. Positive drainage for retaining walls should consist of a vertical layer of permeable material positioned between the retaining wall and the soil backfill. The permeable material may be composed of a composite drainage geosynthetic or a natural permeable material such as crushed gravel at least 12 inches thick and capped with at least 12 inches of native soil. A geosynthetic filter fabric should be placed between the gravel and the soil backfill. Provisions for removal of collected water should be provided for either system by installing a perforated drainage pipe along the bottom of the permeable material which leads to suitable drainage facilities.

DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 442 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey Project No. E8689-04-14 - 14 - December 13, 2021

6.10.4 We recommend that all retaining wall designs be reviewed by Geocon to confirm the incorporation of the recommendations provided herein. In particular, potential surcharges from adjacent structures and other improvements should be reviewed by Geocon.

6.11 Interior Concrete Slabs-on-Grade

6.11.1 Concrete slabs-on-grade subject to vehicle loading are considered pavements should be designed in accordance with the recommendations in Section 6.13 of this report.

6.11.2 Concrete slabs-on-grade for structures, not subject to vehicle loading, should be a minimum of 5 inches thick and minimum slab reinforcement should consist of No. 4 steel reinforcing bars placed 18 inches on center in both horizontal directions. Steel reinforcing should be positioned vertically near the slab midpoint.

6.11.3 Interior slabs should also be underlain by 3 inches of ½-inch or ¾-inch crushed rock with no more than 5 percent passing the No. 200 sieve to serve as a capillary break. The crushed rock should be subjected to several passes with a walk-behind vibratory compactor or similar equipment prior to placing a vapor barrier or rebar for the slab-on-grade.

6.11.4 The slab-on-grade dimensions and minimum reinforcement recommendations presented herein are based upon soil conditions only and are not intended to be used in lieu of those required for structural purposes.

6.11.5 Crack control joints for interior slabs-on-grade should be spaced at intervals not greater than 10 feet and should be constructed using saw-cuts or other methods as soon as practical following concrete placement. Crack control joints should extend a minimum depth of one-fourth the slab thickness.

Construction joints should be designed by the project structural engineer.

6.11.6 The recommendations of this report are intended to reduce the potential for cracking of slabs due to soil movement. However, even with the incorporation of the recommendations presented herein, foundations, stucco walls, and slabs-on-grade may exhibit some cracking due to soil movement. This is common for project areas that contain expansive soils since designing to eliminate potential soil movement is cost prohibitive. The occurrence of concrete shrinkage cracks is independent of the supporting soil characteristics. Their occurrence may be reduced and/or controlled by limiting the slump of the concrete, proper concrete placement and curing, and by the placement of crack control joints at periodic intervals, in particular, where re-entrant slab corners occur.

6.12 Moisture Protection Considerations

6.12.1 A vapor barrier is not required beneath slabs-on-grade for geotechnical purposes. Further, the migration of moisture through concrete slabs or moisture otherwise released from slabs is not a geotechnical issue. However, for the convenience of the owner, we are providing the following general suggestions for consideration by the owner, architect, structural engineer, and contractor. The suggested procedures may reduce the potential for moisture-related floor covering failures on concrete slabs-on-grade, but moisture problems may still occur even if the procedures are followed. If more detailed recommendations are desired, we recommend consulting a specialist in this field. If a vapor barrier is used beneath mat slab foundations, we should review the geotechnical design parameters presented herein.

6.12.2 A vapor barrier meeting ASTM E 1745-09 Class C requirements may be placed directly below the slab, without a sand cushion. To reduce the potential for punctures, a higher quality vapor barrier (15 mil, Class A or B) should be used. The vapor barrier, if used, should extend to the edges of the slab, and should be sealed at all seams and penetrations.

DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 443 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey Project No. E8689-04-14 - 15 - December 13, 2021

6.12.3 The concrete water/cement ratio should be as low as possible. The water/cement ratio should not exceed 0.45 for concrete placed directly on the vapor barrier. Midrange plasticizers could be used to facilitate concrete placement and workability.

6.12.4 Proper finishing, curing, and moisture vapor emission testing should be performed in accordance with the latest guidelines provided by the American Concrete Institute, Portland Cement Association, and ASTM.

6.13 Pavements

6.13.1 The upper 12 inches of pavement subgrade should be scarified, moisture conditioned to at least 2% above optimum and compacted to at least 95% relative compaction. Prior to placing aggregate base, the finished subgrade should be proof rolled with a laden water truck (or similar equipment with high contact pressure) to verify stability. Subgrade soils for the parking lot should be lime-treated per the recommendations in Section 6.5.

6.13.2 Sidewalk, curb and gutter, and driveway encroachments should be designed and constructed in accordance with City of Brentwood requirements, as applicable.

6.13.3 We recommend the following asphalt concrete (AC) pavement sections for design to establish subgrade elevations in pavement areas. The project civil engineer should determine the appropriate Traffic Index (TI) based on anticipated traffic conditions. The flexible pavement sections below are based on estimated design TIs. We can provide additional sections based on other TIs if necessary.

TABLE 6.13

FLEXIBLE PAVEMENT SECTION RECOMMENDATIONS
Location TI
Alternative
#1
Alternative
#2
Alternative
#3
Alternative
#4

AC AB AC AB LTS AB LTS AB
Parking Stalls 4.5 3 8 3 4 12 10 12 15
Driveways 6.0 3 ½ 12 ½ 3 ½ 5 ½ 12 13 12 20
Heavy Duty 7.0 4 15 ½ 4 7 12 15 12 24
Note: The recommended flexible pavement sections are based on the following assumptions:

1. Subgrade soil has an R-Value of 5.

2. AB: Class 2 AB with a minimum R-Value of 78 and meeting the requirements of Section 26 of the latest Caltrans Standard Specifications.

3. AB is compacted to 95% or higher relative compaction at or near optimum moisture content. Prior to placing AB, the subgrade should be proof rolled with a loaded water truck to verify stability.

4. AC: Asphalt concrete conforming to local agency standards or Section 39 of the latest Caltrans Standard Specifications.

5. LTS: Lime-treated subgrade per Section 6.5.

6. TI: Traffic Index, estimated.

7. All tabulated thicknesses are in inches.

6.13.4 The AC sections in Table 6.13 are final, minimum thicknesses. If staged pavements are used, the construction bottom AC lift should be at least 2 inches thick. Following construction, the finish top AC lift should be at least 1.5 inches thick.

6.13.5 It should be understood that AB-surfaced pavement sections e.g. Alternatives #3 and #4 in Table 6.13 are relatively porous compared to AC-surfaced pavements and therefore have an inherently higher potential for surface infiltration and subsequent wetting of subgrade soils. As such, the potential for DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 444 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey Project No. E8689-04-14 - 16 - December 13, 2021
subgrade softening and/or swelling is higher where AB-surfaced pavement are used, especially where subgrade soils are not lime treated.

6.13.6 Unless specifically designed and evaluated by the project structural engineer, where concrete paving will be utilized for support of vehicles, we recommend the concrete be a minimum of 6 inches thick and reinforced with No. 4 steel reinforcing bars placed 18 inches on center in both horizontal directions. In addition, doweling, reinforcing steel or other load-transfer mechanism should be provided at joints if desired to reduce the potential for vertical offset. The concrete should have a minimum 28-day compressive strength of 3,500 psi. Where heavy concentrated loads such as forklift traffic is anticipated, the pavement thickness should be increased to 8 inches minimum.

6.13.7 We recommend that at least 12 inches of Class 2 Aggregate Base be used below rigid concrete pavements. The aggregate base should be compacted to at least 95% relative compaction near optimum moisture content.

6.13.8 In general, we recommend that concrete pavements be designed, constructed, and maintained in accordance with industry standards such as those provided by the American Concrete Pavement Association.

6.13.9 The performance of pavements is highly dependent upon providing positive surface drainage away from the edge of pavements. Ponding of water on or adjacent to the pavement will likely result in saturation of the subgrade materials and subsequent cracking, subsidence, and pavement distress.

If planters are planned adjacent to paving, we recommend the perimeter curb be extended at least 6 inches below the bottom of the aggregate base to minimize the introduction of water beneath the paving. Alternatives such as plastic moisture cut-offs or modified drop-inlets may also be considered.

6.13.10 Asphalt pavement section recommendations for driveways and parking areas are based on Caltrans design procedures. It should be noted that most rational pavement design procedures are based on projected street or highway traffic conditions and, hence, may not be representative of vehicular loading that occurs in parking lots and driveways. Pavement proximity to landscape irrigation, reduced traffic speed and short turning radii increase the potential for pavement distress to occur in parking lots even though the volume of traffic is significantly less than that of an adjacent street. The HDM indicates that the resulting pavement sections for parking lots are minimized to keep initial costs down but are reasonable because additional AC surfacing can be added later, if needed, and generally without incurring traffic hazards or traffic handling problems. It is generally not economically feasible to design and construct the entire parking lot and driveways for the unique loading conditions previously described. Periodic maintenance of the pavement in these areas, therefore, should be anticipated.

6.14 Exterior Slabs

6.14.1 Exterior slabs, not subject to traffic loads, should be at least 4 inches thick and reinforced with No. 4 steel reinforcing bars placed 18 inches on center in both horizontal directions, positioned near the slab midpoint. We recommend that at least 6 inches of Class 2 AB be used below exterior flatwork.

The aggregate base should be compacted to at least 95% relative compaction near optimum moisture content. Prior to placing AB, the subgrade should be moisture conditioned to at least 2% over optimum and properly compacted to at least 90% relative compaction. The AB layer may be omitted where subgrade soils are lime-treated per the recommendations herein.

6.14.2 A thickened edge should be provided at the perimeter of large exterior slab areas such as that planned at the Barn/Entry Canopy. The thickened edge should extend at least 12 inches below lowest adjacent compacted subgrade, which is at least 12 inches below the bottom of the AB layer underlying the slab, where applicable.

DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 445 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey Project No. E8689-04-14 - 18 - December 13, 2021

7. FURTHER GEOTECHNICAL SERVICES

7.1 Plan and Specification Review

7.1.1 We should review project plans and specifications prior to final design submittal to assess whether our recommendations have been properly implemented and evaluate if additional analysis and/or recommendations are required.

7.2 Testing and Observation Services

7.2.1 The recommendations provided in this report are based on the assumption that we will continue as Geotechnical Engineer of Record throughout the construction phase and provide compaction testing and observation services and foundation observations throughout the project. It is important to maintain continuity of geotechnical interpretation and confirm that field conditions encountered are similar to those anticipated during design. If we are not retained for these services, we cannot assume any responsibility for others interpretation of our recommendations, and therefore the future performance of the project.

DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 446 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey

1. COVER LETTER
APPENDIX C:

SCHEDULE OF FEES
DocuSign Envelope ID: D1FF601A-44A8-44E4-9829-38B3059AE14B C.4.h
Packet Pg. 447 Attachment: Geocon Consultants, Inc. Geotechnical Agreement (2677 : Approval of On-Call Civil/Structural, Geotechnical & Survey 6671 Brisa Street ■ Livermore, California 94550 ■ Tel (925) 371-5900

Page 1 of 2 ends
← All documents from this meeting