Extracted automatically — check the source. These rows were read out of the cities' own agendas, staff reports and minutes by a language model (claude-haiku-5-5/v5) on 2026-10-20. Each amount links to the passage it came from and each row to the city's original file, which is the official record. Rows marked check had a problem the checks caught.
12actions
8vendors
$23,347,471approved (recorded vote)
$5,342,112proposed, no vote in the index
Dollar totals add the amount each action states: an amendment's new total can repeat an earlier award, and annual amounts are counted once. Use them as a rough size, the rows for detail.
Actions
| Date | Vendor | Item | Action | Amount | Size · price · savings | Outcome | Sources |
|---|---|---|---|---|---|---|---|
| 2026-04-21 | Lilypad EV | Award of construction contract for the Service Center Electric Vehicle Infrastructure Project to Lilypad EV, LLC in the amount of $592,475 check EV charging | Award | $651,723 not to exceed | Nine (9) Level 2 and one (1) DC Fast EV charging stations | Approved Ayes: Moore, Chao, Fruen, and Mohan. Noes: Wang. Abstain: None. Absent: None. | staff report · staff report · staff report · agenda · minutes |
| 2025-05-06 | Tanko Lighting | Approve a Fourth Amendment to the Tanko Lighting Master Agreement for the Light Emitting Diode (LED) Streetlight Transition Project correcting the maximum compe check LED streetlights | Amendment | $336,172 not to exceed | Approved Ayes: Chao, Moore, Fruen, Mohan, and Wang. Noes: None. Abstain: None. Absent:… | staff report · staff report · agenda · minutes · other | |
| 2025-05-06 | Tanko Lighting | Third Amendment to Tanko Lighting Master Agreement check LED streetlights | Amendment | $179,258 not to exceed | 2,400 streetlights | No vote recorded | staff report · staff report · city original |
| 2025-02-04 | Syserco Energy Solutions | Award of a design-build contract to Syserco Energy Solutions for $4,339,881 and award a project management and construction management agreement to 4Leaf, Inc. check Solar and solar PPAs | Award | $4,339,881 not to exceed | three of the five City of Cupertino facilities (Community Hall, Cupert… approximately $276,000 annually, and $13 million over a 30-year lifesp… | Approved Ayes: Moore, Fruen, and Mohan. Noes: Chao and Wang. | staff report · staff report · staff report · staff report · staff report |
| 2025-02-04 | 4Leaf | Project management and construction management agreement with 4Leaf, Inc. for the Photovoltaic Systems Design and Installation Project, not-to-exceed $225,000. check Solar and solar PPAs | Award | $225,000 not to exceed | three photovoltaic projects The savings in utility costs are projected to be $500,000 annually, an… | Approved Ayes: Moore, Fruen, and Mohan. Noes: Chao and Wang. Abstain: None. Absent: None. | staff report · staff report · staff report · staff report · staff report |
| 2025-02-04 | DBE | Photovoltaic Systems Design and Installation Project - Design-Build Contract (Draft) Solar and solar PPAs | Award | $3,939,881 | No vote recorded | staff report · staff report · city original | |
| 2024-12-17 | Bear Electrical Solutions | Award a construction contract for the Light Emitting Diode (LED) Streetlight Installation Project to Bear Electrical Solutions in the amount of $628,449 and app LED streetlights | Award | $629,449 | Approved Ayes: Mohan, Fruen, Chao, and Moore. Noes: None. Abstain: None. Absent: Wei. | staff report · other · city original | |
| 2024-12-03 | Tanko Lighting | Third amendment to construction management agreement with Tanko Lighting for CIP projects check LED streetlights | Amendment | $306,914 not to exceed | 2,400 streetlights | No vote recorded | staff report · staff report · staff report · staff report · other |
| 2024-12-03 | Bear Electrical Solutions | Award a construction contract for the Light Emitting Diode (LED) Streetlight Installation Project to Bear Electrical Solutions check LED streetlights | Award | $692,394 not to exceed | 2,400 streetlights net total of approximately $1,900,000 over a 20-year period | No vote recorded | staff report · staff report · staff report · agenda · minutes |
| 2024-01-17 | Beam Global | Accept Silicon Valley Clean Energy Community Resilience Grant in the amount of up to $233,963 to purchase two (2) Electric Vehicle Autonomous Renewable Charger EV charging | Cooperative purchase | $233,963 | two EV ARC units with trailer $63,542.22 per EV ARC 2020 unit (list, incl. 2% CA DGS discount) | Approved Ayes: Wei, Mohan, Chao, Fruen, and Moore. Noes: None. Abstain: None. Absent:… | staff report · staff report · staff report · staff report · staff report |
| 2023-12-05 | Beam Global | Grant Agreement - Beam Global solar-powered transportable EV charging systems (SVCE grant application) check Bundles | Cooperative purchase | $223,665 | two solar-powered transportable electric vehicle charging systems $63,542.22 per EV ARC 2020 unit (list, with 2% CA DGS discount) | No vote recorded | staff report · staff report · staff report · city original |
| 2023-03-21 | Via Transportation | Consider a four-year contract with Nomad Transit LLC (Via) for the TIRCP funded Via expansion into the City of Santa Clara, with EV fleet and charging stations Bundles | Award | $16,931,283 not to exceed | three Lighting 3ZEV wheelchair accessible vehicles | Approved The motion carried unanimously. | staff report · staff report · staff report · agenda · other |