Rialto
Energy contracts the Rialto City Council took up since 2022. All Rialto meetings.
Extracted automatically — check the source. These rows were read out of the cities' own agendas, staff reports and minutes by a language model (claude-haiku-5-5/v5) on 2026-10-20. Each amount links to the passage it came from and each row to the city's original file, which is the official record. Rows marked check had a problem the checks caught.
6actions
5vendors
$3,437,970approved (recorded vote)
$3,923,802proposed, no vote in the index
Dollar totals add the amount each action states: an amendment's new total can repeat an earlier award, and annual amounts are counted once. Use them as a rough size, the rows for detail.
Actions
| Date | Vendor | Item | Action | Amount | Size · price · savings | Outcome | Sources |
|---|---|---|---|---|---|---|---|
| 2026-06-23 | St. Francis Electric | Request City Council to: (1) Authorize a Task Order in the Amount of $729,782.74 for the Cactus Trail Solar Light Project, City Project No 26088 With St Francis Solar and solar PPAs | Award | $729,783 | 99 solar-powered light posts | No vote recorded | agenda · packet · packet · other · city original |
| 2024-08-13 | Marcon Engineering | Construction Agreement with Marcon Engineering Inc. - Public Works Administration Building Restoration Project (City Project No. 220201) Efficiency retrofits and ESPCs | Award | $3,179,019 | No vote recorded | staff report · city original | |
| 2024-04-27 | Siemens Industry | Rialto Streetlight Retrofit Proposal (Siemens LED street light conversion, Attachment 1) check LED streetlights | Award | $15,000 not to exceed | 2,098 70W cobraheads, 1,349 100W, 199 150W, 66 200W, 3 250W, 1 400W, 4… $358.33 to $735.55 per fixture by type (base scope) minimum of $73,000 of first-year initial annual cost savings (Project … | No vote recorded | staff report · staff report · staff report · city original |
| 2023-02-14 | Rialto Water Services | Adopt Resolution No. 8047; Adopt RUA Resolution No. 02-23 and Approve the Final Construction Work Authorization to Rialto Water Services for 60% Design and Prep Microgrids and backup power | Award | $3,167,063 | Approved 5-0 | agenda · minutes · other · city original | |
| 2022-12-13 | Southern California Edison | Charge Ready Charging Infrastructure and Rebate Participation Agreement (SCE) EV charging | Award | — | 10 Level 2 charging ports at Fleet Services, 245 S Willow Ave L2 charging equipment rebate $2,900 (DAC) / $1,450 / $725 per port | No vote recorded | staff report · city original |
| 2022-03-08 | Rialto Water Services | Final Construction Work Authorization to Rialto Water Services in the amount of $270,907 for Rialto Biosolids Upgrade Study, Plant 1&2 Demolition Design and GMP Microgrids and backup power | Award | $270,907 | 360 kW Reciprocating Engine, 1,575 kW Photovoltaic System and 2,460 kW… | Approved 5-0 | staff report · staff report · agenda · packet · packet |