Extracted automatically — check the source. These rows were read out of the cities' own agendas, staff reports and minutes by a language model (claude-haiku-5-5/v5) on 2026-10-20. Each amount links to the passage it came from and each row to the city's original file, which is the official record. Rows marked check had a problem the checks caught.
9actions
7vendors
$139,786approved (recorded vote)
$1,250,000proposed, no vote in the index
Dollar totals add the amount each action states: an amendment's new total can repeat an earlier award, and annual amounts are counted once. Use them as a rough size, the rows for detail.
Actions
| Date | Vendor | Item | Action | Amount | Size · price · savings | Outcome | Sources |
|---|---|---|---|---|---|---|---|
| 2025-09-16 | Trolley Pass Project | Third Phase Agreement with NCPA for the Trolley Pass Project (energy storage BESS, 5 MW share) Battery storage | Award | — | 5 MW share of a 400 MW battery energy storage system (NCPA contract si… $12.71/kW-month (flat) with no escalation expected net cost near zero; about $750,000 in net market proceeds | No vote recorded | packet · packet · city original |
| 2025-04-01 | EDF | Discussion and possible action to approve a Resolution approving the term sheet with EDF, Inc., and authorizing negotiations of a Power Purchase Agreement. Power supply (municipal utilities) | Award | — | Approved By motion made/seconded (Watkins/Ringwelski), and carried unanimously | packet · packet · packet · city original | |
| 2025-04-01 | EDF Renewables | Term sheet with EDF Renewable for solar PV and BESS at wastewater treatment plant (pre-PPA) Bundles | Award | — | 5,000 kilowatt (5 megawatt) fixed tilt Solar PV; 3,000 kW BESS for 4 h… | No vote recorded | packet · city original |
| 2024-10-15 | Musco Sports Lighting | ENERGY EFFICIENCY LIGHTING UPGRADE AT MARGARET POLF REGIONAL PARK Efficiency retrofits and ESPCs | Cooperative purchase | $575,000 | energy reductions exceeding 30% compared to the old systems | No vote recorded | agenda · agenda · city original |
| 2024-07-02 | Grace Orchard Energy Center | Third Phase Agreement for Grace Solar Project (Northern California Power Agency; Grace Orchard Energy Center, LLC renewable PPA, 50 MWAC solar) Power supply (municipal utilities) | Award | — | 5 MW $42.51/MWh (flat) with no escalation City's expected gross cost of the PPA is about $372,400 per year; City… | No vote recorded | packet · city original |
| 2023-09-05 | Designs Build | Resolution to award the City Hall Electric Vehicle Charging Station Project to Designs Build, Inc. of Sacramento, CA in the amount of $139,786.00, and approve a check EV charging | Award | $150,000 not to exceed | two (2) level 3 electric vehicle charging stations | No vote recorded | packet · city original |
| 2023-09-05 | Designs Build | Resolution CC-2023-xx: Award City Hall Electric Vehicle Charging Station Project to Designs Build, Inc. of Sacramento, CA in the amount of $139,786.00 and appro check EV charging | Award | $139,786 | 1 LS City Hall Electric Vehicle Charging Stations | Approved | packet · packet · city original |
| 2022-11-15 | ChargePoint | City-owned electric vehicle charging station (EVCS) at City Hall campus, using Sourcewell cooperative contract for ChargePoint devices EV charging | Cooperative purchase | $400,000 | two Level 3 electric vehicle charging station equipment $0.25/kWh point-of-sale rate | No vote recorded | packet · city original |
| 2022-09-06 | Musco Sports Lighting | Energy Efficiency Lighting Upgrade at Shasta Field in Bizz Johnson Ball Park Efficiency retrofits and ESPCs | Cooperative purchase | $125,000 | No vote recorded | packet · city original |