Extracted automatically — check the source. These rows were read out of the cities' own agendas, staff reports and minutes by a language model (claude-haiku-5-5/v5) on 2026-10-20. Each amount links to the passage it came from and each row to the city's original file, which is the official record. Rows marked check had a problem the checks caught.
9actions
7vendors
$139,786approved (recorded vote)
$1,250,000proposed, no vote in the index

Dollar totals add the amount each action states: an amendment's new total can repeat an earlier award, and annual amounts are counted once. Use them as a rough size, the rows for detail.

Actions

DateVendorItemActionAmountSize · price · savingsOutcomeSources
2025-09-16Trolley Pass ProjectThird Phase Agreement with NCPA for the Trolley Pass Project (energy storage BESS, 5 MW share)
Battery storage
Award—5 MW share of a 400 MW battery energy storage system (NCPA contract si…
$12.71/kW-month (flat) with no escalation
expected net cost near zero; about $750,000 in net market proceeds
No vote recordedpacket · packet · city original
2025-04-01EDFDiscussion and possible action to approve a Resolution approving the term sheet with EDF, Inc., and authorizing negotiations of a Power Purchase Agreement.
Power supply (municipal utilities)
Award—Approved
By motion made/seconded (Watkins/Ringwelski), and carried unanimously
packet · packet · packet · city original
2025-04-01EDF RenewablesTerm sheet with EDF Renewable for solar PV and BESS at wastewater treatment plant (pre-PPA)
Bundles
Award—5,000 kilowatt (5 megawatt) fixed tilt Solar PV; 3,000 kW BESS for 4 h…No vote recordedpacket · city original
2024-10-15Musco Sports LightingENERGY EFFICIENCY LIGHTING UPGRADE AT MARGARET POLF REGIONAL PARK
Efficiency retrofits and ESPCs
Cooperative purchase$575,000energy reductions exceeding 30% compared to the old systemsNo vote recordedagenda · agenda · city original
2024-07-02Grace Orchard Energy CenterThird Phase Agreement for Grace Solar Project (Northern California Power Agency; Grace Orchard Energy Center, LLC renewable PPA, 50 MWAC solar)
Power supply (municipal utilities)
Award—5 MW
$42.51/MWh (flat) with no escalation
City's expected gross cost of the PPA is about $372,400 per year; City…
No vote recordedpacket · city original
2023-09-05Designs BuildResolution to award the City Hall Electric Vehicle Charging Station Project to Designs Build, Inc. of Sacramento, CA in the amount of $139,786.00, and approve a check
EV charging
Award$150,000
not to exceed
two (2) level 3 electric vehicle charging stationsNo vote recordedpacket · city original
2023-09-05Designs BuildResolution CC-2023-xx: Award City Hall Electric Vehicle Charging Station Project to Designs Build, Inc. of Sacramento, CA in the amount of $139,786.00 and appro check
EV charging
Award$139,7861 LS City Hall Electric Vehicle Charging StationsApprovedpacket · packet · city original
2022-11-15ChargePointCity-owned electric vehicle charging station (EVCS) at City Hall campus, using Sourcewell cooperative contract for ChargePoint devices
EV charging
Cooperative purchase$400,000two Level 3 electric vehicle charging station equipment
$0.25/kWh point-of-sale rate
No vote recordedpacket · city original
2022-09-06Musco Sports LightingEnergy Efficiency Lighting Upgrade at Shasta Field in Bizz Johnson Ball Park
Efficiency retrofits and ESPCs
Cooperative purchase$125,000No vote recordedpacket · city original