Extracted automatically — check the source. These rows were read out of the cities' own agendas, staff reports and minutes by a language model (claude-haiku-5-5/v5) on 2026-10-20. Each amount links to the passage it came from and each row to the city's original file, which is the official record. Rows marked check had a problem the checks caught.
5actions
5cities
$362,256approved (recorded vote)
$0.00proposed, no vote in the index
2024-06-03first action in the index

Dollar totals add the amount each action states: an amendment's new total can repeat an earlier award, and annual amounts are counted once. Use them as a rough size, the rows for detail.

Actions

DateCityItemActionAmountSize · price · savingsOutcomeSources
2024-07-17UkiahAdoption of Resolution to Enter into a Third Phase Agreement for Renewable Power Purchase Agreement with Grace Orchard Energy Center, LLC, and Authorize the Cit
Power supply (municipal utilities)
Award$362,256
per year
50MW solar photovoltaic facility; average 8,521 MWh/year
$42.51/MWh (flat) with no escalation
Approved
AYES: Rodin, Sher, Crane, and Duenas. NOES: None. ABSENT: Orozco. ABSTAIN: None.
agenda · minutes · packet · packet · packet
2024-07-15GridleyRenewable Power Purchase Agreement between Northern California Power Agency (NCPA) and Grace Orchard Energy Center, LLC (PPA), and (ii) the Third Phase Agreemen
Power supply (municipal utilities)
Award—50 MW solar facility
$42.51/MWh (flat) with no escalation
No vote recordedagenda · agenda · agenda · minutes · city original
2024-07-02Shasta LakeThird Phase Agreement for Grace Solar Project (Northern California Power Agency; Grace Orchard Energy Center, LLC renewable PPA, 50 MWAC solar)
Power supply (municipal utilities)
Award—5 MW
$42.51/MWh (flat) with no escalation
City's expected gross cost of the PPA is about $372,400 per year; City…
No vote recordedpacket · city original
2024-06-04LompocAdoption of Resolution No. 6662(24) Authorizing the City Manager or Designee to Execute a Third Phase Agreement for a Renewable Power Purchase Agreement with Gr
Power supply (municipal utilities)
Award—Approvedminutes · city original
2024-06-03HealdsburgConsider approving of a Third Phase Agreement with NCPA for the Purchase of Solar Energy from the Grace Orchard Energy Center in Riverside County check
Power supply (municipal utilities)
Awardsee source2.6MW
NCPA General Manager may increase PPA pricing by $8.50/megawatt-hour
project's costs still represent a cost savings when compared to spot m…
Approved
Ayes 5, Noes 0, Absent – None