Energy contracts the Healdsburg City Council took up since 2022. All Healdsburg meetings.

Extracted automatically — check the source. These rows were read out of the cities' own agendas, staff reports and minutes by a language model (claude-haiku-5-5/v5) on 2026-10-20. Each amount links to the passage it came from and each row to the city's original file, which is the official record. Rows marked check had a problem the checks caught.
25actions
18vendors
$2,259,482approved (recorded vote)
$1,682,502proposed, no vote in the index

Dollar totals add the amount each action states: an amendment's new total can repeat an earlier award, and annual amounts are counted once. Use them as a rough size, the rows for detail.

Actions

DateVendorItemActionAmountSize · price · savingsOutcomeSources
2026-09-08Peterson Power SystemsContract with Peterson Power Systems, Inc. to perform critical repairs to the emergency backup generator at the City Wastewater Reclamation Facility
Microgrids and backup power
Award$78,048
not to exceed
1250kW Onan Diesel GeneratorApproved
Ayes 5, Noes 0, Absent – None
agenda · minutes · packet · packet · city original
2026-06-15NV5Amendment to Agreement with NV5
Other
Amendment$100,000
not to exceed
No vote recordedpacket · city original
2026-05-18Efficiency Services GroupAuthorizing New Rebate Programs for Electric Vehicle Purchases, EV Chargers, and Electric Panel Upgrades (ESG contract extension to June 30, 2028)
Other
Renewal / extension—No vote recordedpacket · city original
2025-09-15Pat Nelson ConstructionAccept Public EV Charging Stations Project, Phase 1 (EL002) as complete and authorize Notice of Completion
EV charging
Other$233,015six Maher Gallery charging ports and four Senior Center charging portsNo vote recordedpacket · city original
2025-02-18BKF EngineersPROFESSIONAL SERVICES AGREEMENT WITH BKF ENGINEERS TO DEVELOP CONSTRUCTION DOCUMENTS FOR PUBLIC EV CHARGING STATIONS AT 5 LOCATIONS THROUGHOUT HEALDSBURG
EV charging
Award$61,570
not to exceed
5 locationsApproved
Ayes 5, Noes 0, Absent – None
packet · city original
2024-12-16Pat Nelson ConstructionContract for the Construction of Public Electric Vehicle Charging Stations at the Maher and Senior Center parking Lots
EV charging
Award$210,040
not to exceed
six charging stations at the Maher Lot and four charging stations at t…Approved
Ayes 5, Noes 0, Absent – None
agenda · minutes · packet · packet · city original
2024-12-16Premier Engineering and ConstructionRejection of Premier Engineering and Construction bid for Public EV Charging Station Phase 1
EV charging
Rejected$155,478No vote recordedpacket · city original
2024-10-21Utility Design ServicesA Professional Services Agreement with Utility Design Services, LLC
Other
Award$94,850
not to exceed
No vote recordedpacket · city original
2024-10-07Altec IndustriesPurchase of Replacement Electric Line Trucks
Fleet vehicles
Purchase order$1,012,477
not to exceed
one Altec D3050E Digger Derrick Electric Line Truck and one Altec Mode…Approved
Ayes 5, Noes 0, Absent – None
agenda · packet · packet · city original
2024-10-07the Ford Store San LeandroProcurement of Vehicles and Equipment
Fleet vehicles
Purchase order$153,567two (2) 2024 Ford F-150 Lightning Pro Pickup TrucksApproved
Ayes 5, Noes 0, Absent – None
agenda · minutes · packet · packet · packet
2024-06-03Grace Orchard Energy CenterConsider approving of a Third Phase Agreement with NCPA for the Purchase of Solar Energy from the Grace Orchard Energy Center in Riverside County check
Power supply (municipal utilities)
Awardsee source2.6MW
NCPA General Manager may increase PPA pricing by $8.50/megawatt-hour
project's costs still represent a cost savings when compared to spot m…
Approved
Ayes 5, Noes 0, Absent – None
agenda · minutes · packet · packet · city original
2024-05-20OptiwattEnergy Load Management Program with Optiwatt
Other
Award$688,768
not to exceed
500 EVs, 100 EV chargers, and 1,000 thermostats
$30 per EV or EV charger semi-annually; $20 per PHEV semi-annually; $2…
No vote recordedpacket · packet · city original
2024-04-15Hansel FordProcurement of Vehicles and Equipment - purchase of a 2023 Ford Mustang Mach-E from Hansel Ford
Fleet vehicles
Purchase order$50,997one 2023 Ford Mustang Mach-EApproved
Ayes 4, Noes 0, Absent – Kelley
agenda · minutes · packet · packet · city original
2024-04-15SourcewellProcurement of Vehicles and Equipment - Sourcewell cooperative purchase of a 2023 Ford F-150 Lightning
Fleet vehicles
Cooperative purchase$69,145
not to exceed
1 vehicleApproved
Ayes 4, Noes 0, Absent – Kelley
agenda · minutes · packet · packet · city original
2024-04-01Efficiency Services GroupAppliance Replacement Program: no-cost contract extension with Efficiency Services Group to June 30, 2026
Efficiency retrofits and ESPCs
Renewal / extension—No vote recordedpacket · city original
2024-03-18BKF EngineersProfessional Services Agreement with BKF Engineers to Develop Construction Documents for Public EV Charging Stations at Five Locations throughout Healdsburg
EV charging
Award$61,570
not to exceed
design and construction drawings for five public EV charging stationsApproved
Ayes 5, Noes 0, Absent – None
agenda · minutes · packet · city original
2024-02-05RinconContract with Rincon to develop a long-range energy and demand forecast (CMS action BE-1.1)
Other
Award$87,350
not to exceed
No vote recordedpacket · city original
2024-01-16Alternative Energy Systems ConsultingWastewater Treatment Plant Energy Efficiency Audit check
Efficiency retrofits and ESPCs
Award$54,050
not to exceed
approximately 2% to 20% reduction in electricity usage at the WRFApproved
Ayes 5, Noes 0, Absent – None
agenda · minutes · packet · packet · packet
2023-03-06Efficiency Services GroupAmendment to Professional Services Agreement with Efficiency Services Group (ESG) for energy efficiency rebate administration, field services and technical supp
Efficiency retrofits and ESPCs
Amendment$277,700
not to exceed
Approved
Ayes 5, Noes 0, Absent – None
minutes · packet · packet · city original
2023-03-06ESGAmendment to professional services agreement with ESG for commercial rebate administration and multi-family low-income appliance direct install program support
Efficiency retrofits and ESPCs
Amendment$120,000
not to exceed
No vote recordedpacket · city original
2022-12-19National Auto Fleet GroupPurchase of 2023 Ford E-Transit Cargo Van from National Auto Fleet Group under Sourcewell contract
Fleet vehicles
Cooperative purchase$62,041
not to exceed
1 2022 Ford E-Transit Cargo VanNo vote recordedpacket · city original
2022-06-21Efficiency Services GroupAmendment to professional services agreement with Efficiency Services Group, LLC for energy efficiency administration and low-income online application portal
Efficiency retrofits and ESPCs
Amendment$141,000
not to exceed
Energy efficiency goal of 360 MWhNo vote recordedpacket · city original
2022-05-02Aggreko HoldingsRental of Emergency Backup Generator at Wastewater Reclamation Facility Second Amendment
Microgrids and backup power
Amendment$10,984
not to exceed
emergency backup generator rentalApproved
Ayes 5, Noes 0, Absent - None
agenda · minutes · packet · packet · city original
2022-05-02National Auto Fleet GroupProcurement of Vehicles and Equipment
Fleet vehicles
Cooperative purchase$145,735
not to exceed
three (3) 2022 Ford F150 Lightning battery electric trucksApproved
Ayes 5, Noes 0, Absent - None
agenda · minutes · packet · packet · city original
2022-02-07Aggreko HoldingsRental of Emergency Backup Generator at Wastewater Reclamation Facility
Microgrids and backup power
Amendment$73,599
not to exceed
1250kW diesel generator rental (temporary emergency backup)
$16,006 per month
Approved
Ayes 5, Noes 0, Absent - None
agenda · minutes · packet · packet · city original