Cities Index.
Vendor · Energy

BKF Engineers

Contract actions with BKF Engineers in California city council documents since 2022 — also written as BKF; BKF (formerly MNS Engineers); BKF Engineering Inc.; BKF Engineers Inc; BKF Engineers Inc.; MNS Engineers; MNS Engineers Inc.; MNS Engineers, Inc..

Extracted automatically — check the source. These rows were read out of the cities' own agendas, staff reports and minutes by a language model (claude-haiku-5-5/v5) on 2026-10-20. Each amount links to the passage it came from and each row to the city's original file, which is the official record. Rows marked check had a problem the checks caught.
6actions
4cities
$418,600approved (recorded vote)
$0.00proposed, no vote in the index
2024-03-18first action in the index

Dollar totals add the amount each action states: an amendment's new total can repeat an earlier award, and annual amounts are counted once. Use them as a rough size, the rows for detail.

Actions

DateCityItemActionAmountSize · price · savingsOutcomeSources
2026-09-16SoledadResolution No. 6422, Amendment No. 1 to Consulting Services Agreement with BKF for HMGP Application Support for Backup Emergency Generators Project
Microgrids and backup power
Amendment$33,093
not to exceed
Approved
Ayes: Cabrera, Bañuelos, Caldera, Ansaldo-Sánchez; Noes: None; Absent: Velazquez
agenda · packet · packet · city original
2026-06-01Foster CityTask Order with BKF Engineers for On-Call Civil Engineering Services for CIP 301-725 Install Electric Vehicle Charging Stations, City Resolution No. 2026-048
EV charging
Award$153,815seven (7) electric vehicle dual port EV chargers plus three (3) make-r…Approved
carried unanimously, 5-0-0
staff report · staff report · staff report · minutes · packet
2025-02-18HealdsburgPROFESSIONAL SERVICES AGREEMENT WITH BKF ENGINEERS TO DEVELOP CONSTRUCTION DOCUMENTS FOR PUBLIC EV CHARGING STATIONS AT 5 LOCATIONS THROUGHOUT HEALDSBURG
EV charging
Award$61,570
not to exceed
5 locationsApproved
Ayes 5, Noes 0, Absent – None
packet · city original
2024-09-18SoledadResolution No. 6161, Approving a Consulting Services Task Order with MNS Engineers to Prepare a Hazard Mitigation Grant Program (HMGP) Application for the City'
Microgrids and backup power
Award$75,652
not to exceed
Approved
Ayes: Cabrera, Ansaldo-Sánchez, Bañuelos, Mayor Pro Tem Corralejo, Velazquez;…
agenda · packet · packet · city original
2024-09-10GreenfieldAuthorize MNS Engineers, Inc. to perform construction management and inspection services for the generator project, not to exceed $32,900.00
Microgrids and backup power
Award$32,900Approved
All in favor. Motion carried.
agenda · agenda · minutes · city original
2024-03-18HealdsburgProfessional Services Agreement with BKF Engineers to Develop Construction Documents for Public EV Charging Stations at Five Locations throughout Healdsburg
EV charging
Award$61,570
not to exceed
design and construction drawings for five public EV charging stationsApproved
Ayes 5, Noes 0, Absent – None
agenda · minutes · packet · city original

Cities

Foster City · Greenfield · Healdsburg · Soledad