City · Energy
Stockton
Energy contracts the Stockton City Council took up since 2022. All Stockton meetings.
Extracted automatically — check the source. These rows were read out of the cities' own agendas, staff reports and minutes by a language model (claude-haiku-5-5/v5) on 2026-10-20. Each amount links to the passage it came from and each row to the city's original file, which is the official record. Rows marked check had a problem the checks caught.
18actions
13vendors
$6,209,927approved (recorded vote)
$6,775,408proposed, no vote in the index
Dollar totals add the amount each action states: an amendment's new total can repeat an earlier award, and annual amounts are counted once. Use them as a rough size, the rows for detail.
Actions
| Date | Vendor | Item | Action | Amount | Size · price · savings | Outcome | Sources |
|---|---|---|---|---|---|---|---|
| 2026-03-03 | Graybar Electric Company | APPROVE MOTION TO AUTHORIZE A COOPERATIVE PURCHASE AGREEMENT FOR THE PURCHASE OF POST-TOP SOLAR LIGHTS LED streetlights | Cooperative purchase | $493,501 not to exceed | 133 post-top solar lights | Approved Motion carried 6-0 | staff report · agenda · minutes · packet · city original |
| 2025-12-09 | Siemens Industry | APPROVE MOTION TO AUTHORIZE A COOPERATIVE PURCHASE AGREEMENT FOR CITYWIDE SIEMENS HVAC CONTROLS SOFTWARE SERVICES, AND DELTA WATER TREATMENT PLANT BUILDING AUTO Efficiency retrofits and ESPCs | Cooperative purchase | $607,266 not to exceed | No vote recorded | agenda · packet · city original | |
| 2025-10-14 | Collins Electric | ADOPT RESOLUTION TO AUTHORIZE THE GENERATOR INSTALLATION PROJECT Microgrids and backup power | Award | $2,954,535 | sixteen emergency backup generators at the Police Department, various … | Approved | staff report · packet · packet · city original |
| 2025-05-13 | Bear Electrical Solutions | ADOPT RESOLUTION TO AUTHORIZE THE LED STREET LIGHTS CONVERSION, PHASES 7 AND 8 PROJECT LED streetlights | Award | $604,125 | 1,785 high-pressure sodium residential streetlights converted to LED annual energy savings of approximately $104,500 | Approved | staff report · staff report · agenda · minutes · packet |
| 2025-05-13 | St. Francis Electric | ADOPT RESOLUTION TO AUTHORIZE THE DECORATIVE STREET LIGHT CONVERSION TO LED PROJECT check LED streetlights | Award | $325,430 | 133 decorative metal halide streetlights converted to LED | Approved | staff report · staff report · agenda · minutes · packet |
| 2025-05-13 | St. Franis Electric | Decorative Street Light Conversion to LED Project No. WD25049 - Local Construction Contract check LED streetlights | Award | $325,430 | 100 EA Stockton LED fixtures; 33 EA decorative post top retrofits $3,070.00 per EA for King Ferronite fixture replacement | No vote recorded | staff report · packet · city original |
| 2025-03-18 | Fonroche Lighting America | Approve a motion and ratify the emergency purchase of 17 solar lights for the March Lane Underpass Solar and solar PPAs | Purchase order | $117,550 | 17 solar lights | Approved Motion carried 7-0 | agenda · minutes · packet · packet · city original |
| 2025-02-18 | Fonroche Lighting America | APPROVE A MOTION TO ENTER INTO A COOPERATIVE PURCHASING AGREEMENT FOR SOLAR LIGHTING Other | Cooperative purchase | $387,527 | 100 solar lights | Approved Motion carried 7-0 | agenda · minutes · packet · city original |
| 2024-11-12 | Caterpillar, Inc. through affiliated vendor Holt of California | Cooperative Purchase Agreement (COOP) through Sourcewell for 12 generators and 12 ATS with Caterpillar, Inc. through Holt of California Microgrids and backup power | Cooperative purchase | $2,935,636 | 12 generators and 12 ATS | No vote recorded | packet · city original |
| 2024-11-12 | Holt of California | Exhibit 1 - COOP with Caterpillar including Holt of CA: Holt of California quotation, Stockton Fire Department Replacement, Sourcewell price Microgrids and backup power | Cooperative purchase | $685,260 | Six (6) XQ125 110kW diesel gensets plus six CG400 automatic transfer s… $114,210.00 (Each) for XQ125 genset | No vote recorded | staff report · packet · city original |
| 2024-10-01 | Howk Systems | Resolution approving Notice of Exemption, project plans and specifications, and awarding construction contract to Howk Systems, Inc. for electrical upgrades at Microgrids and backup power | Award | $754,717 | No vote recorded | staff report · packet · city original | |
| 2024-08-20 | Caterpillar, Inc. through affiliated vendor Holt of California | ADOPT RESOLUTION TO AUTHORIZE A COOPERATIVE PURCHASE AGREEMENT FOR THE PURCHASE OF GENERATORS AND AUTOMATIC TRANSFER SWITCHES WITH HOUSING Microgrids and backup power | Cooperative purchase | $1,317,099 | eight generators and eight automatic transfer switches | No vote recorded | packet · packet · city original |
| 2024-02-06 | Bear Electrical Solutions | ADOPT RESOLUTION TO AUTHORIZE THE LED STREET LIGHTS CONVERSION, PHASE 6 PROJECT LED streetlights | Award | $507,500 | 1,500 high-pressure sodium streetlights converted to LED $325.00 per luminaire conversion approximately $87,800 annual energy savings | Approved | staff report · staff report · agenda · minutes · packet |
| 2023-03-07 | Pacific Excavation | Adopt resolution to authorize the Downtown Decorative Streetlight LED Conversion, Project No. WD22016 LED streetlights | Award | $597,852 | 184 decorative streetlights | Approved | staff report · staff report · agenda · minutes · packet |
| 2022-07-12 | Bear Electrical Solutions | ADOPT RESOLUTION TO AUTHORIZE THE LED STREET LIGHTS CONVERSION, PHASE 5 PROJECT check LED streetlights | Award | see source | 2,200 high-pressure sodium streetlights converted to LED approximately $94,600 annual energy savings | Approved | staff report · staff report · agenda · minutes · packet |
| 2022-07-12 | NET Electric | Reject Net Electric, Inc.'s bid for LED Street Lights Conversion, Phase 5 LED streetlights | Rejected | — | No vote recorded | packet · city original | |
| 2022-05-24 | Tri Power Systems | APPROVE MOTION TO AUTHORIZE THE FIRE STATION NO. 2 COMMUNICATION CENTER UNINTERRUPTIBLE POWER SUPPLY REPLACEMENT PROJECT Microgrids and backup power | Award | $150,000 | No vote recorded | packet · packet · city original | |
| 2022-04-05 | Bear Electrical Solutions | Adopt resolution to authorize the Residential Streetlight LED Replacement Project LED streetlights | Award | $221,907 | remaining 3,800 failing LED fixtures $31.14 per luminaire replacement; $25.57 per photocell replacement | Approved Motion carried 7-0 | staff report · staff report · agenda · minutes · packet |