Vendor · Energy
Gridscape Solutions
Contract actions with Gridscape Solutions in California city council documents since 2022 — also written as Gridscape Solutions, Inc..
Extracted automatically — check the source. These rows were read out of the cities' own agendas, staff reports and minutes by a language model (claude-haiku-5-5/v5) on 2026-10-20. Each amount links to the passage it came from and each row to the city's original file, which is the official record. Rows marked check had a problem the checks caught.
3actions
2cities
$0.00approved (recorded vote)
$3,242,640proposed, no vote in the index
2024-04-23first action in the index
Dollar totals add the amount each action states: an amendment's new total can repeat an earlier award, and annual amounts are counted once. Use them as a rough size, the rows for detail.
Actions
| Date | City | Item | Action | Amount | Size · price · savings | Outcome | Sources |
|---|---|---|---|---|---|---|---|
| 2026-02-24 | Thousand Oaks | Power Backup at Lang Ranch Pump Station (CI 5702): Design and Build Contract for energy services to Gridscape Solutions, Inc. Microgrids and backup power | Award | $2,180,640 | microgrid with battery energy storage system, diesel backup generator … | No vote recorded | staff report · agenda · minutes · other · city original |
| 2024-11-12 | San Anselmo | Council to approve a parking lot option for the Solar Photovoltaic System for the Town Hall Resilience Hub. Bundles | Amendment | — | 94 kW Magnolia array; BESS on Town Hall lot | No vote recorded | packet · city original |
| 2024-04-23 | San Anselmo | Energy service contract with Gridscape Solutions for solar PV, battery storage and microgrid for Town Hall Resilience Hub check Bundles | Award | $1,062,000 | 91.14kW DC solar system; 150kWh/60kW battery microgrid $4.95/Watt base; $5.20/Watt domestic content energy cost savings expected to exceed project costs; positive net sav… | No vote recorded | packet · city original |