Extracted automatically — check the source. These rows were read out of the cities' own agendas, staff reports and minutes by a language model (claude-haiku-5-5/v5) on 2026-10-20. Each amount links to the passage it came from and each row to the city's original file, which is the official record. Rows marked check had a problem the checks caught.
8actions
7vendors
$147,331approved (recorded vote)
$1,275,521proposed, no vote in the index
Dollar totals add the amount each action states: an amendment's new total can repeat an earlier award, and annual amounts are counted once. Use them as a rough size, the rows for detail.
Actions
| Date | Vendor | Item | Action | Amount | Size · price · savings | Outcome | Sources |
|---|---|---|---|---|---|---|---|
| 2024-12-10 | Pacific Gas and Electric | Lighting upgrades on-bill financing with PG&E (energy efficiency loan) Efficiency retrofits and ESPCs | Award | $147,331 | $1,207.43 per month estimated monthly energy cost savings of $1,219.62; estimated savings … | No vote recorded | packet · city original |
| 2024-11-12 | Gridscape Solutions | Council to approve a parking lot option for the Solar Photovoltaic System for the Town Hall Resilience Hub. Bundles | Amendment | — | 94 kW Magnolia array; BESS on Town Hall lot | No vote recorded | packet · city original |
| 2024-04-23 | Gridscape Solutions | Energy service contract with Gridscape Solutions for solar PV, battery storage and microgrid for Town Hall Resilience Hub check Bundles | Award | $1,062,000 | 91.14kW DC solar system; 150kWh/60kW battery microgrid $4.95/Watt base; $5.20/Watt domestic content energy cost savings expected to exceed project costs; positive net sav… | No vote recorded | packet · city original |
| 2023-10-24 | EcoGreen Solutions | Prepared a staff report and resolution to contract with EcoGreen Solutions to upgrade the lighting in Town-owned facilities to LEDs as part of PG&E's Energy Eff Efficiency retrofits and ESPCs | Sole-source award | $147,331 | $1,207.43 per month estimated monthly energy cost savings of $1,219.62; estimated cost sav… | Approved | packet · packet · packet · city original |
| 2023-04-25 | Gravely | Purchase of a New Electric Riding Lawnmower Fleet vehicles | Purchase order | $28,790 | 1 electric riding lawnmower | No vote recorded | packet · city original |
| 2022-08-23 | Sage Energy Consulting | Authorization to Sign an Agreement with Sage Energy Consulting and Request for Resilience Hub Consultant Funds check Microgrids and backup power | Award | see source | Approved AYES: Burdo, Burke, Colbert, Greene, Mayor Fineman | agenda · minutes · packet · city original | |
| 2022-08-23 | NV5 | Task Order #22041-01 NEM 2.0 Grandfathering Interconnection Application Assistance with Sage Renewable Energy Consulting, Inc. (Attachment 2) check Solar and solar PPAs | Award | $18,700 not to exceed | solar PV on two sites (Town Hall + Police Station, Library) | No vote recorded | packet · city original |
| 2022-08-23 | SAGE | Item 2.5 Attachment 3: SAGE task order for Investment-Grade Solar PV Feasibility Study (Time and Materials not to exceed fee table) Solar and solar PPAs | Award | $18,700 not to exceed | No vote recorded | packet · city original |