Cities Index.
Agenda packet

Folsom City Council
June 14, 2022

Document
Agenda packet
Meeting
June 14, 2022
Body
Folsom City Council
Pages
508
Original file
36.3 MB
Text extracted from the city's file for reading and search. Open the original on mccmeetings.blob.core.usgovcloudapi.net. That file is the official record.

1 Agenda
City Council Regular Meeting
City Council Chambers | 50 Natoma Street, Folsom CA 95630 June 14, 2022
6:30 PM
Welcome to Your City Council Meeting
We welcome your interest and involvement in the city’s legislative process. This agenda includes information about topics coming before the City Council and the action recommended by city staff. You can read about each topic in the staff reports, which are available on the city website and in the Office of the City Clerk. The City Clerk is also available to answer any questions you have about City Council meeting procedures.

Participation
If you would like to provide comments to the City Council, please:
 Fill out a blue speaker request form, located at the back table.  Submit the form to the City Clerk before the item begins.  When it’s your turn, the City Clerk will call your name and invite you to the podium.  Speakers have three minutes, unless the presiding officer (usually the mayor) changes that time.

Reasonable Accommodations
In compliance with the Americans with Disabilities Act, if you are a person with a disability and you need a disability-related modification or accommodation to participate in this meeting, please contact the City Clerk’s Office at (916) 461-6035, (916) 355-7328 (fax) or [email protected]. Requests must be made as early as possible and at least two full business days before the start of the meeting.

How to Watch
The City of Folsom provides three ways to watch a City Council meeting:

In Person Online On TV

City Council meetings take place at
City Hall, 50 Natoma Street
Watch the livestream and replay past
meetings on the city website,
www.folsom.ca.us
Watch live and replays of meetings on
Sac Metro Cable TV, Channel 14

More information about City Council meetings is available at the end of this agenda

Page 1 ends

2 City Council Regular Meeting

Folsom City Council Chambers
50 Natoma Street, Folsom, CA

www.folsom.ca.us
Tuesday, June 14, 2022 6:30 PM

Kerri Howell, Mayor

Rosario Rodriguez, Vice Mayor Sarah Aquino, Councilmember YK Chalamcherla, Councilmember Mike Kozlowski, Councilmember

REGULAR CITY COUNCIL AGENDA
Members of the public wishing to participate in this meeting via teleconference may participate either online or by telephone via WebEx.

Meeting Number: 2551 510 5507
Meeting Password: 06 14 2022

Join the meeting by WebEx online:
https://cityoffolsom.my.webex.com/cityoffolsom.my/j.php?MTID=mbbb8b7b1df8da07726c1a89bcefea455

To make a public comment using the WebEx online platform, please use the “raise hand” feature at the bottom center of the screen. Please make sure to enable audio controls once access has been given by the City Clerk to speak. Please wait to be called upon by the City Clerk.

Join the meeting by WebEx telephone: Dial 1-415-655-0001 To make a public comment by phone, please press *3 to raise your hand. Please make sure to enable audio controls by pressing *6 once access has been given by the City Clerk to speak. Please wait to be called upon by the City Clerk.

Verbal comments via virtual meeting must adhere to the principles of the three-minute speaking time permitted for public comment at City Council meetings.

CALL TO ORDER
ROLL CALL:

Councilmembers: Kozlowski, Rodriguez, Aquino, Chalamcherla, Howell

Page 2 ends

3 The City Council has adopted a policy that no new item will begin after 10:30 p.m. Therefore, if you are here for an item that has not been heard by 10:30 p.m., you may leave, as the item will be continued to a future Council Meeting.

PLEDGE OF ALLEGIANCE

AGENDA UPDATE
BUSINESS FROM THE FLOOR:

Members of the public are entitled to address the City Council concerning any item within the Folsom City Council's subject matter jurisdiction. Public comments are limited to no more than three minutes. Except for certain specific exceptions, the City Council is prohibited from discussing or taking action on any item not appearing on the posted agenda.

SCHEDULED PRESENTATIONS:

1. A Proclamation of the Mayor of the City of Folsom Proclaiming June 19, 2022 as Juneteenth National Freedom Day in the City of Folsom

2. A Proclamation of the Mayor of the City of Folsom Proclaiming July 1 - 3, 2022 as Western Rodeo Days in the City of Folsom
CONSENT CALENDAR:

Items appearing on the Consent Calendar are considered routine and may be approved by one motion. City Councilmembers may pull an item for discussion.

3. Approval of May 10, 2022 Special and Regular Meeting Minutes

4. Approval of May 24, 2022 Special and Regular Meeting Minutes

5. Resolution No. 10862 - A Resolution Calling and Giving Notice of the Holding of a General Municipal Election to be Held on Tuesday, November 8, 2022, Requesting the Board of Supervisors of the County of Sacramento Consolidate the General Municipal Election with the Statewide General Election, and Establishing Policies for Candidates’ Statements

6. Resolution No. 10863 – A Resolution Authorizing the City Manager to Execute a Regional Water Authority Biological Opinion Services and Support Program Agreement and Appropriation of Funds

7. Resolution No. 10864 – A Resolution Authorizing the City Manager to Execute an Agreement with E Source Companies, LLC to Complete the City of Folsom’s Water Loss Control Program and Appropriation of Funds

8. Resolution No. 10865 - A Resolution Authorizing Public Fireworks Displays During the Annual Folsom Pro Rodeo Activities

9. Resolution No. 10866 – A Resolution Authorizing the City Manager to Execute a Subdivision Improvement Agreement and Accept Offers of Dedication for the Toll Brothers at Folsom Ranch Phase 1E Subdivision, and Approval of the Final Map for the Toll Brothers at Folsom Ranch Phase 1E Subdivision

10. Resolution No. 10867 - A Resolution Authorizing the City Manager to Execute Non-Exclusive Agreements with Approved Licensed Contractors to Implement the Sacramento Housing and Redevelopment Agency Inter-Agency Contract for the Seniors Helping Seniors Home Repair Program

11. Resolution No. 10869 - A Resolution Authorizing the City Manager to Adopt Local Assistance Procedures Manual Chapter 10, Consultant Selection, Policies and Procedures for Federal and State-only Funded Projects

Page 3 ends

4 12. Resolution No. 10872 - A Resolution Authorizing the City Manager to Submit an Application for Grant Funds to the United States Department of Justice, Community Oriented Policing Services (COPS) Hiring Program

13. Resolution No. 10873 - A Resolution Authorizing the City Manager to Execute an Agreement with BrightView Landscape Services for Landscaping and Lighting Districts, Community Facilities Districts, and Folsom Plan Area Landscapes for the City of Folsom and Appropriation of Funds PUBLIC HEARING:

14. Resolution No. 10861 – A Resolution Adopting the City Manager’s Fiscal Year 2022-23 Operating and Capital Budgets for the City of Folsom, the Successor Agency, the Folsom Public Financing Authority, and the Folsom Ranch Financing Authority OLD BUSINESS:

15. Resolution No. 10871 - A Resolution Adopting the Public Works and Parks and Recreation Departments 2022 Active Transportation Plan (ATP)
NEW BUSINESS:

16. Resolution No. 10868 - A Resolution of the City Council Determining that the Proposed Lease Renewal is Exempt from the California Environmental Quality Act and Authorizing the City Manager to Execute and Agreement to Renew a Land Lease with the Placerville & Sacramento Valley Railroad for the Use of the Wye Property

17. Resolution No. 10870 - A Resolution of Consideration of the City Council of the City of Folsom to Amend the Rate and Method of Apportionment for Improvement Area No. 6 within the City of Folsom Community Facilities District No. 23 (Folsom Ranch), and Related Matters CITY MANAGER REPORTS:

COUNCIL COMMENTS:

ADJOURNMENT

NOTICE: Members of the public are entitled to directly address the Cit y Council concerning any item that is described in the notice of this meeting, before or during consideration of that item. If you wish to address Council on an issue, which is on this agenda, please complete a blue speaker request card, and deliver it to a staff member at the table on the left side of the Council Chambers prior to discussion of the item. When your name is called, stand to be recognized by the Mayor and then proceed to the podium. If you wish to address the City Council on any other item of interest to the public, when the Mayor asks if there is any “Business from the Floor,” follow the same procedure described above. Please limit your comments to three minutes or less.

NOTICE REGARDING CHALLENGES TO DECISIONS: Pursuant to all applicable laws and regulations, including without limitation, California Government Code Section 65009 and or California Public Resources Code Section 21177, if you wish to challenge in court any of the above decisions (regarding planning, zoning and/or environmental decisions), you may be limited to raising only those issues you or someone else raised at the public hearing(s) described in this notice/agenda, or in written correspondence delivered to the City at, or prior to, the public hearing.

As presiding officer, the Mayor has the authority to preserve order at all City Council meetings, to remove or cause the removal of any person from any such meeting for disorderly conduct, or for making personal, impertinent, or slanderous remarks, using profanity, or beco ming boisterous, threatening or personally abusive while addressing said Council, and to enforce the rules of the Council.

Page 4 ends

5 PERSONS INTERESTED IN PROPOSING AN ITEM FOR THE CITY COUNCIL AGENDA SHOULD CONTACT A MEMBER OF THE CITY COUNCIL.

The meeting of the Folsom City Council is being telecast on Metro Cable TV, Channel 14, the Government Affairs Channel, and will be shown in its entirety on the Friday and Saturday following the meeting, both at 9 a.m. The City does not control scheduling of this telecast and persons interested in watching the televised meeting should confirm this schedule with Metro Cable TV, Channel 14. The City of Folsom provides live and archived webcasts of regular City Council meetings. The webcasts can be found on the online services page of the City's website www.folsom.ca.us.

In compliance with the Americans with Disabilities Act, if you are a person with a disability and you need a disability-related modification or accommodation to participate in this meeting, please contact the City Clerk’s Office at (916) 461-6035, (916) 355-7328 (fax) or [email protected]. Requests must be made as early as possible and at least two full business days before the start of the meeting.

Any documents produced by the City and distributed to the City Council regarding any item on this agenda will be made available at the City Clerk’s Counter at City Hall located at 50 Natoma Street, Folsom, California and at the Folsom Public Library located at 411 Stafford Street, Folsom, Ca lifornia during normal business hours.

Page 5 ends

6 This page is intentionally left blank.

Page 6 ends

PROCI-AVIATION

OF THE MAYOR OF THE CITY OF FOLSOM
PROCLAIMING JLINE ag, 2o.22
AS

JUNETEENTH NATIONAL FREEDOM DAY

IN THE CITY OF FOLSOM
WHEREAS, our nation was conceived on July 4, t776, with the Declaration of Independence.

One of the foundational statements of the Declaration was:
"We hold these truths to be self-evident, that all men are created egual, that they are endowed by their Creator with certain unalienable RighB, that among these are Life, Libefi and the purcuit of HappinesC'; and
WHEREAS, President Abraham Lincoln signed the Emancipation Proclamation on January 1, 1863, declaring the slaves in Confederate territory free, paving the way for the passing of the 13th Amendment which formally abolished slavery in the United States of America; and WHEREAS' word about the signing of the Emancipation Proclamation was delayed over two years, finally reaching authorities and African Americans in the South and Southwestern United States on June 19, 1865; and
WHEREAS, June 19th has a special meaning, and is called "Juneteenth" combining the words June and Nineteenth. Juneteenth honors the end to slavery in the United States and it is considered the longest-running African American holiday; and WHEREAS' Juneteenth, also called Juneteenth National Independence Day, Emancipation Day, Freedom Day, Jubilee Day, Black Independence Day, and Juneteenth Independence Day, commemorates the emancipation of African American slaves. It officially became a federal holiday in 202I, and it is a day that should be celebrated by all Americans:

NOW THEREFORE, BE IT RESOLVED, that the Folsom City Council hereby proclaims June t9,2022 as "Juneteenth National Freedom Day" in Folsom. Juneteenth is an opportunity to learn about American history and the ideals of equality and freedom. We encourage residents, schools, businesses, and community groups to celebrate Juneteenth as a day of remembrance and celebration.

PROCLAIMED this 14th day of June 2022
Attest:

Kerri M. Howell, Mayor Christa Freemantle, City Clerk

Page 7 ends

06/14/2022 Item No.1.

This page is intentionally left blank.

Page 8 ends

06/14/2022 Item No.1.

PROCI-AMATION

OF THE MAYOR OF THE CITY OF FOLSOM
PROCLAIMING JULY 1- 3' 2022
AS
WESTERI\ RODEO DAYS

IN THE CITY OF FOLSOM
WHEREAS, the City of Folsom proudly recognizes Folsom's western heritage and acknowledges the benefits of preseruing the traditions and customs of the City's history; and WHEREAS, the annual Folsom Pro Rodeo is a cornerstone of Folsom's link to its colorful past and is thoroughly enjoyed by residents and visitors alike; and WHEREAS, this year's event, to be held July 1 - 3 at the Dan Russell Arena, marks the 61st anniversary of the Folsom Pro Rodeo and marks it as one of the longest-running events in Northern California; and
WHEREAS, this year's Grand Marshal and the rodeo's own "Uncle Sam" is Adam Frick. An astounding community paftner and volunteer who has been a member of the Chamber of Commerce and a rodeo volunteer since 2005; and
WHEREAS, the 61st anniversary event highlights include traditional rodeo events such as saddle and bareback bronc riding, steer wrestling, team roping, barrel racing, bull riding, peformance by the Painted Ladies Drill Team, Flying Cowboys, rodeo clowns, nightly fireworks, mutton busting, and live music in the Saloon Under the Stars; and WHEREAS, in honor of the traditional patriotic theme, the Folsom Pro Rodeo will celebrate with the ever-popular in-arena spectacular fireworks; and WHEREAS, the Folsom Pro Rodeo is made possible with the assistance of hundreds of volunteers and thousands of fans and spectators who enjoy every minute of the exciting action- packed rodeo and entertainment; and
NOW THEREFORE, I, Kerri M. Howell, Mayor of the City of Folsom, do hereby proclaim July 1 - 3,2022, as WESTERN RODEO DAYS IN FOTSOM and call upon all citizens to "cowboy up" and join in the festivities celebrating the 61st anniversary of the Folsom Pro Rodeo; and BE IT FURTHER PROCLAIMED that the Folsom City Council extends sincere best wishes to the Chamber of Commerce for a successful rodeo season.

PROCLAIMED this 14th day of June 2022.

Attest:

Kerri M. Howell, Mayor Christa Freemantle, City Clerk

Page 9 ends

06/14/2022 Item No.2.

This page is intentionally left blank.

Page 10 ends

06/14/2022 Item No.2.

Book 76 Page 236
Folsom City Council
May 10,2022
City Gouncil Special Meeting

MINUTES
Tuesday, May 10, 2022 6:00 PM

CALL TO ORDER
The special City Council meeting was called to order at 6:00 pm with Mayor Kerri Howell presiding.

ROLL GALL:

Councilmembers Present: Sarah Aquino, Councilmember
YK Chalamcherla, Councilmember
Rosario Rodriguez, Vice MaYor
Kerri Howell, Mayor
Councilmembers Absent:

Participating Staff:

Mike Kozlowski, Councilmember
City Manager Elaine Andersen
City Attorney Steven Wang
Deputy City Clerk Lydia KonoPka
ADJOURNM TO CLOSED SESSI FOR THE FOLLOWING PURPOSES:

1. Conference with Legal Counsel - Anticipated Litigation. Significant Exposure to Litigation pursuant to Government Code section 54956.9(e)(3): Application for Leave to File a Late Claim by George Lane
Motion by Gouncilmember Sarah Aquino, second by Vice Mayor Rosario Rodriguez to adjourn tb CloseO Session for the above referenced item. Motion carried with the following roll call vote:

AYES: Gouncilmember(s): Rodriguez, Aquino, Ghalamcherla, Howell NOES: Gouncilmember(s): None
ABSENT: Gouncilmember(s): Kozlowski
ABSTAIN: Gouncilmember(s): None

RECONVENE
City Attorney Steven Wang announced that no final action was taken during Closed Session DRAFT - Not official until approued bit the Ciry Coundl. Page 11 06/14/2022 Item No.3.

Book 76 Page237
Folsom Gity Council
May 10,2022

ADJOURNMENT
The meeting was adjourned at 6:17 p.m
ATTEST:

Kerri Howell, Mayor

SUBMITTED BY
Lydia Konopka, Deputy City Clerk
DRAFT - Not oficial until apprnued b! the Ciry Council. Page 12 06/14/2022 Item No.3.

Book 76 Page 238
Folsom City Council
May 10,2022
City Gouncil Regular Meeting

MINUTES
Tuesday, May 10, 2022 6:30 PM

CALL TO ORDER
The regular City Council meeting was called to order at 6:30 pm with Mayor Kerri Howell presiding.

ROLL GALL:

Councilmembers Present: Sarah Aquino, Councilmember
YK Chalamcherla, Councilmember
Rosario Rodriguez, Vice Mayor
Kerri Howell, Mayor
Councilmembers Absent: Mike Kozlowski, Councilmember (arrived at 7:39 pm) Participating Staff: City Manager Elaine Andersen
City Attorney Steven Wang
Deputy City Clerk Lydia Konopka
Communications Director Christine Brainerd
Administrative Assistant Jennifer Thiot
Police Lieutenant Lou Wright
Police Lieutenant Brian Lockhart
Senior Office Assistant Lindsey Tayler
CFO/Finance Director Stacey Tamagni
Associate Planner Josh Kincade
Community Development Director Pam Johns
Public Works Director Mark Rackovan

PLEDGE OF ALLEGIANCE
The Pledge of Allegiance was recited

AGENDA UPDATE
City Attorney Steven Wang announced that item 18 had additional information BUSINESS FROM THE FLOOR:

None
DRAFT - Not official until approued b1 the Citit Coandl. Page 13 06/14/2022 Item No.3.

Book 76 Page239
Folsom City Council
May 10,2022
SGHEDULED PRESENTATIONS:

1. Proclamation of the Mayor of the City of Folsom Proclaiming May 1 5-21,2022 as National Police Week in the City of Folsom
Mayor Kerri Howell presented the proclamation to Lieutenant Lou Wright and Lieutenant Brian Lockhart.

Z. Proclamation of the Mayor of the City of Folsom Proclaiming May 15 through May 21 , 2022 as "National Public Works Week" and May 18,2022 as "City Works Day" in the City of Folsom
Communications Manager Christine Brainerd introduced the item. Administrative Assistant Jennifer Thiot and Senior Office Assistant Lindsey Tayler made a presentation.

Councilmember Sarah Aquino presented the proclamation.

3. City Manager's Fiscal Year 2Q21-22Third Quarter Financial Report CFO/Finance Director Stacey Tamagni made a presentation and responded to questions from the City Council.

4. Presentation of the City Manager's Fiscal Year 2022-23 Proposed Operating and Capital Budgets for the City of Folsom, the Successor Agency, the Folsom Public Financing Authority, and the Folsom Ranch Public Financing Authority CFO/F;nance Director Stacey Tamagni made a presentation and responded to questions from the City Council.

GONSENT CALENDAR:

Items appearing on the Consent Calendar are considered routine and may be approved by one motion. City Councilmembers may pull an item for discussion.

5. Approval of April 12,2022 Special and Regular Meeting Minutes

6. Approval of April 26,2022 Regular Meeting Minutes
7 . Resolution No. 10839 - A Resolution of the City Council Ratifying the City Manager's Authorization for Emergency Replacement of the On-Site Fuel Tanks at the City of Folsom Corporation Yard, Determining the Project is Exempt from CEQA, and Appropriation of Funds

8. Resolution No. 10840 - A Resolution Authorizing the City Manager to Execute a Subdivision lmprovement Agreement and Accept Offers of Dedication for the Mangini DRAFT - Not official antil approued fui the Ciry Council. Page 14 06/14/2022 Item No.3.

Book 76 Page240
Folsom City Council
May 10,2022
Ranch Phase 2 Village No. 3 Subdivision, and Approval of the Final Map for the Mangini Ranch Phase 2 Village No. 3 Subdivision
g. Resolution No 10841 - A Resolution Ratifying the City Manager's Execution of a Purchase Agreement with Golden State Fire Apparatus lnc. for a Ladder Truck from Pierce Manufacturing lnc. Pursuant to Folsom Municipal Code Section 2.36.150, and the Approval of an lnterfund Loan and Appropriation of Funds

10. Resolution No. 10842 - A Resolution Authorizing the City Manager to Execute an Agreement with McGuire and Hester for Construction of the Water Treatment Plant Backwash and Recycled Water Upgrades Project and Appropriation of Funds 1 1. Resolution No. 10843 - A Resolution Authorizing the City Manager to Execute an Agreement with lnferrera Construction Management Group, lnc. for Construction Management and lnspection Services for the Water Treatment Plant Backwash and Recycled Water Upgrades Project

12. Resolution No. 10844 - A Resolution Approving the Preliminary Engineer's Report for the following Landscaping and Lighting Districts for Fiscal Year 2022-2023 and Setting Public Hearing for American River Canyon North, American River Canyon North No. 2, American River Canyon North No. 3, Blue Ravine Oaks, Blue Ravine Oaks No. 2, Briggs Ranch, Broadstone, Broadstone No. 4, Broadstone Unit No. 3, Cobble Ridge, Cobble Hills Ridge ll/Reflections ll, Folsom Heights, Folsom Heights No.2, Hannaford Cross, Lake Natoma Shores, Los Cerros, Natoma Station, Natoma Valley, Prairie Oaks Ranch, Prairie Oaks Ranch No. 2, Prospect Ridge, Sierra Estates, Silverbrook, Steeplechase, The Residences at American River Canyon, The Residences at American River Canyon ll, Willow Creek Estates East, Willow Creek Estates East No. 2, Willow Creek Estates South, and Willow SPrings

13. Resolution No. 10845 - A Resolution Authorizing the City Manager to Execute an Amendment to the Memorandum of Understanding Agreement (Contract No. 174-2120- 062) with the Capital Southeast Connector Joint Powers Authority for the Southeast Connector Segment D3(A) Bike Trail and Appropriation of Funds

14. Resolution No. 10846 - A Resolution Authorizing the City Manager to Execute a Design and Consulting Services Contract with Bennett Engineering Services, lnc. forthe East Bidwell Street/lron Point Road and US50 Onramp lmprovement Project and Appropriation of Funds

15. Resolution No. 10847 - A Resolution Authorizing the City Manager to Execute a Contract Change Order for the Pedestrian/Bike Trail with Goodfellow Brothers, LLC (Contract No. 174-2120-060) for the Capital SouthEast Connector Segment D3(A), Project No.

PW1607, Federal Project No. 5288(046)

16. Resolution No. 10848 - A Resolution Adopting a List of Projects for Fiscal Year 2022-23 to be Funded by Senate Bill 1: The Road Repair and Accountability Act

17. Resolution No. 10850 - A Resolution Authorizing the City Manager to Execute a Subdivision lmprovement Agreement and Accept Offers of Dedication for the Mangini DRAFT - Not ffiial until approued fui the Ci4t Coundl. Page 15 06/14/2022 Item No.3.

Book 76 Page241
Folsom City Council
May 10,2022
Ranch Phase 1C South Village No. 4 Subdivision, and Approval of the Final Map for the Mangini Ranch Phase'1C South Village No.4 Subdivision
Motion by Vice Mayor Rosario Rodriguez second by Gouncilmember YK Chalamcherla, to approve the Gonsent Galendar.

Motion carried with the following roll call vote:

AYES:

NOES:

ABSENT:

ABSTAIN:

Gouncilmember(s): Aquino, Chalamcherla, Rodriguez, Howell Councilmember(s): None
Gouncilmember(s): Kozlowski
Gouncilmember(s): None
PUBLIC HEARING:
(item taken out of order)

19. Folsom Corporate Center Apartments - South Side of lron Point Road, East of the lntersection of lron Point Road and Oak Avenue Parkway (PN 21-120) i. Resolution No. 10849 - A Resolution to Adopt a Mitigated Negative Declaration, Approve a General Plan Amendment, and Approve a Planned Development Permit for the Folsom Corporate Center Apartments Project
ii. Ordinance No. 1327 - An Uncodified Ordinance to Amend the Zoning Designation for a7.24-acre Parcel (Lot 1) from M-L PD to R-4 PD and to Amend the Zoning Designation for a 4.68-acre Parcel (Lot 6) from BP PD to R-4 PD for the Folsom Corporate Center Apartments Project (lntroduction and First Reading)
Councilmember Sarah Aquino announced that she needed to recuse herself from this item due to both members of Cole Partners being family friends and one is also a client at her insurance business. She left the room for the duration of this agenda item.

Councilmember Mike Kozlowski arrived at 7:39 pm
Community Development Director Pam Johns made a presentation and responded to questions from the City Council. Traffic consultant Dr. Thomas Kear from T. Kear Transportation, Planning and Management, lnc. provided clarification.

Mayor Kerri Howell opened the public hearing. Hearing no public comments, the public hearing was closed.

Motion by Vice Mayor Rosario Rodriguez second by Gouncilmember Mike Kozlowski, to approve Resolution No. 10849.

Motion carried with the following roll call vote:

AYES: Councilmember(s): Ghalamcherla, Kozlowski, Rodriguez, Howell NOES: Councilmember(s): None
DRAFT - Not offidal until approued fui the Citl Council. Page 16 06/14/2022 Item No.3.

Book 76 Page242
Folsom City Council
May 10,2022
Motion by Councilmember Mike Kozlowskisecond by Vice Mayor Rosario Rodriguez, to introduce and conduct the first reading of Ordinance No. 1327.

Motion carried with the following roll call vote:

ABSENT:

ABSTAIN:

AYES:

NOES:

ABSENT:

ABSTAIN:

Gouncilmember(s): Aquino (recused)
Gouncilmember(s): None
Gouncilmember(s): Ghalamcherla, Kozlowski, Rodriguez, Howell Councilmember(s): None
Councilmember(s): Aquino (recused)
Gouncilmember(s): None
Councilmember Sarah Aquino returned to the dais.

18. Appeal by lgor Semenyuk of a Decision by the Historic District Commission Denying a Conditional Use Permit for the Lakeside Memorial Lawn Crematorium project (PN 19- 182) located at 1201 Forrest Street (Gontinued from April 26, 20221 Associate Planner Josh Kinkade made a presentation and responded to questions from the City Council. Additional clarification was provided by Community Development Director Pam Johns.

Appellant lgor Semenyuk addressed the City Council and responded to questions.

Mayor Kerri Howell opened the public hearing
The following speakers addressed the City Council

1. Janice Brial

2. Dean Dodson

3. Dan Charlebois

4. Dan Winkelman

5. Steve Walsh

6. Matt Almas

7. Larry Allbauch

8. lsaac Monical

9. Dwight B.

10. Kathryn Corbett

11. Dr. McGary (via teleconference)

12. Owen Thomas (via teleconference)

13. Mike Reynolds (via teleconference)

14.Tim McGary (via teleconference)
Hearing no further comments, the public hearing was closed Appellant lgor Semenyuk provided closing remarks to the City Council Associate Planner Josh Kinkade responded to questions from the City Council DRAFf - Not fficial until approued b.y rhe Ci4t Coundl. Page 17 06/14/2022 Item No.3.

Book 76 Page243
Folsom City Council
May 10,2022
Motion by Gouncilmember Sarah Aquino, second by Councilmember Mike Kozlowski, to deny the appeal and affirm the Historic District Commission's decision to deny the conditional use permit.

City Attorney Steven Wang provided clarification regarding the finding of the conditional use permit as it related to the motion.

Each of the Councilmembers commented regarding the project.

City Attorney Steven Wang asked Mayor Kerri Howell to allow community member Loretta Hettinger to speak on this item now, as she was unable to comment using her Webex connection at home. Mayor Howell agreed.

The following speaker addressed the City Council:
o Loretta Hettinger
Mayor Kerri Howell called for the vote on Gouncilmember Sarah Aquino's motion Motion failed with the following roll call vote:

AYES:

NOES:

ABSENT:

ABSTAIN
Gouncilmember(s): Aquino, Kozlowski
Councilmember(s): Ghalamcherla, Rodriguez, Howell
Councilmember(s): None
Councilmember(s): None
City Attorney Steven Wang explained that the motion failed, but another motion may be made.

He suggested that the Mayor call for a recess to help craft the findings should the Council wish to make a different motion.

Motion by Vice Mayor Rosario Rodriguez to grant the appeal and overturn the Historic District Commission's decision.

Councilmember YK Chalamcherla asked to amend the motion to add the requirement that the applicant add a weather station for monitoring air quality to the project and that the project go before a design review committee. Vice Mayor Rosario Rodriguez agreed to the amendment to her motion.

Mayor Kerri Howell called for a recess at 9:56 pm. The City Council resumed the meeting at 10:09 pm.

City Attorney Steven Wang reminded the Gity Gouncil that the pending motion was a motion to grant the appeal by lgor Semenyuk, thereby overturning the decision of the Historic District Gommission denying a Conditional Use Permit for the Lakeside Memorial Lawn Grematorium (PN 19-1821located at1201Forrest Street, based upon the conditions of approval and based upon the following findings:

Gommunity Development Director Pam Johns read the findings for the record:

General Findings:

DRAFT - Nor fficial until approued b1 the Ci4t Coundl. Page 18 06/14/2022 Item No.3.

Book 76 Page244
Folsom City Council
May 10,2022
A. Notice of hearing has been given at the time and in the manner required by State law and Gity code.

B. The project is consistent with the General Plan and the Zoning Gode of the Gity CEQA Findings:

C. A mitigated negative declaration has been prepared for the project in accordance with GEQA.

D. Pursuant to AB 52, before release of the Mitigated Negative Declaration for this project, the Gity contacted all Galifornia Native American tribes on the City's AB 52 contact list in association with the proiect.

E. The Gity received one request for consultation from California Native American tribes and consultation was subsequently concluded. No changes to the project were required as a result of the consultation.

F. The Gity Gouncil has considered the Initial Study, the proposed Mitigated Negative Declaration and all comments received during the public review process before making a decision regarding the project.

G. The Mitigated Negative Declaration reflects the independent judgement and analysis of the Gity of Folsom.

H. The Mitigated Negative Declaration has determined that the proposed project would not have a significant effect on the environment with the required with the required mitigation measures and the conditions of approval on the project. l. On the basis of the whole record, there is no substantial evidence that the project will have a significant effect on the environment with the required mitigation measures and the conditions of approval on the project.

Land Use Gompatibility Finding:

J. As conditioned, the proposed crematory is appropriate as an accessory use to the existing cemetery.

Conditional Use Permit Finding:

K. As conditioned, the establishment, maintenance and operation of the use applied for will not, under the circumstances of this particular case, be detrimental to the health, safety, peace, morals, comfort, and generalwelfare of persons residing or working in the neighborhood, or be detrimental or injurious to property and improvements in the neighborhood or to the general welfare of the Gity, as the proposed project will not have negative impacts to nearby commercial or residential uses that have not been mitigated.

Additionally, the conditions in the staff report Attachment 2 starting on page 514 as presented to the Historic District Commission, Gonditions No. 1-30, with the addition of new condition No. 31.

New condition 31 would read:
"31. A Davis lnstruments Vantage Vue, Vantage Pro2 or similar weather station shall be installed on the shed on which the crematory machine is proposed prior to installation of the crematorium to the satisfaction of the Community Development Department." DRAFT - Not fficial until approued fut the Ci4t Coundl Page 19 06/14/2022 Item No.3.

Book76 Page245
Folsom City Council
May 10,2022
City Attorney Steven Wang reminded the Gity Gouncil that lf the Gouncil were to approve this motion, the Council will also be approving the lnitial Study and Mitigated Negative Declaration.

There was more discussion and clarification between the City Council and staff on requiring the applicant to install a weather station. Vice Mayor Rosario Rodriguez recommended that the motion not include requiring the applicant to install a weather station because it is not a requirement of the Air Quality Management District for other crematoriums. Councilmember YK Chalamcherla concurred. Community Development Director Pam Johns confirmed that a condition requiring the applicant to install a weather station will not be a part of the approval.

Motion carried with the following roll call vote:

AYES:

NOES:

ABSENT:

ABSTAIN:

Gouncilmember(s): Ghalamcherla, Rodriguez, Howell
Councilmember(s): Aquino, Kozlowski
Gouncilmember(s): None
Councilmember(s): None
Councilmember(s): Aquino, Ghalamcherla, Rodriguez, Kozlowski Councilmember(s): None
Councifmember(s): Howell (recused)
Councilmember(s): None
OLD BUSINESS:

20. Resolution No. 10831 - A Resolution of the City Council of the City of Folsom Approving an Affordable Housing Loan in the Amount of $588,265.55 to Bidwell Place, LP for Construction of the 7S-unit Bidwell Place Affordable Multifamily Project, and Appropriation of Funds
Mayor Kerri Howell announced that she needed to recuse herself from this item due to leasing property within 500 feet of the project location. She left the room for the duration of this agenda item.

Community Development Director Pam Johns made a presentation and responded to questions from the City Council.

Motion by Councilmember Sarah Aquino second by Gouniilmember Mike Kozlowski, to approve Resolution No. 10831.

Motion carried with the following roll call vote:

AYES:

NOES:

ABSENT:

ABSTAIN:

Mayor Kerri Howell returned to the dais.

Councilmember Sarah Aquino asked that the 10:30 rule be waived in order to continue the meeting.

Motion by Councilmember Sarah Aquino second by Vice Mayor Rosario Rodriguez to waive the 10:30 rule.

DRAFT - Not fficial until approued fui the Ci4t Coancil' Page 20 06/14/2022 Item No.3.

Book 76 Page246
Folsom City Council
May 10,2022
Motion carried with the following roll callvote:

AYES: Councilmember(s): Aquino, Ghalamcherla, Kozlowski, Rodriguez, Howell NOES: Gouncilmember(s): None
ABSENT: Gouncilmember(s): None
ABSTAIN: Councilmember(s): None
NEW BUSINESS:

21. Ordinance No. 1326 - An Uncodified Ordinance of the City of Folsom Approving the Folsom Police Department's Military Equipment Use Policy in Compliance with Assembly Bill481 (lntroduction and First Reading)
Police Lieutenant Brian Lockhart made a presentation.

Motion by Councilmember Sarah Aquino second by Gouncilmember YK Ghalamcherla, to introduce and conduct the first reading of Ordinance No. 1326.

Motion carried with the following roll call vote:

AYES: Gouncilmember(s): Aquino, Ghalamcherla, Kozlowski, Rodriguez, Howell NOES: Gouncilmember(s): None
ABSENT: Councilmember(s): None
ABSTAIN: Gouncilmember(s): None

22. Consideration of Letter in Response to Demand Letter Received from Scott Rafferty Regarding Alleged Non-Compliance with the Brown Act
Motion by Gouncilmember Mike Kozlowski second by Gouncilmember YK Ghalamcherla, to continue to comply with the Brown Act.

Motion carried with the following roll call vote:

AYES: Gouncilmember(s): Aquino, Ghalamcherla, Kozlowski, Rodriguez, Howell NOES: Gouncilmember(s): None
ABSENT: Gouncilmember(s): None
ABSTAIN: Councilmember(s): None
CITY MANAGER REPORTS:

City Manager Elaine Andersen announced that Folsom was named in the top 50 livable small cities in the United States by the Personal Finance website. She congratulated Folsom businesses and apartment communities for diverting food waste from landfills and explained that voters can drop otf their ballots at the ballot drop box location at City Hall or the vote center at the Community Center.

DRAFT - Not ffidal until apprlued bjt the Ciry Council' Page 21 06/14/2022 Item No.3.

Book 76 Page247
Folsom City Council
May 10,2022
GITY COUNGIL GOMMENTS:

Vice Mayor Rosario Rodriguez commented regarding her positive experience on the recent Cap to Cap tilp. Mayor Kerri Howell responded with her past experiences on that trip.

Councilmember YK Chalamcherla spoke of the recent School Board/City Council Two by Two meeting and the Golden State Regional Scouts Council meeting he attended. He stated that he will also be attending the City Leadership Summit. He commented about attending the upcoming city works Day and thanked staff for all their hard work.

Councilmember Mike Kozlowski commented regarding the recent SACOG Policy and lnnovation meeting he attended and the Vista Del Lago Varsity track meet and their 8th consecutive win.

Mayor Kerri Howell spoke of the continuing construction of the Southeast Connector segment and the recent Regional Transit meeting. She encouraged everyone to drive safely.

ADJOURNMENT
There being no further business to come before the Folsom City Council, Mayor Kerri Howell adjourned the meeting at 1O:44 Pm.

SUBMITTED BY
Lydia Konopka, Deputy City Clerk
ATTEST:

Kerri Howell, Mayor
DRAFT - Not offidal until Eproued fu the Ciry Counc"il. Page 22 06/14/2022 Item No.3.

Book 76 Page248
Folsom City Council
May 24,2022
Gity Council Special Meeting

MINUTES
Tuesday, May 24,2022 5:30 PM

CALL TO ORDER
The special City Council meeting was called to order at 5:30 pm with Mayor Kerri Howell presiding.

ROLL GALL:

Councilmembers Present YK Chalamcherla, Councilmember
Rosario Rodriguez, Vice Mayor
Sarah Aquino, Councilmember
Kerri Howell, Mayor
Councilmembers Absent: Mike Kozlowski, Councilmember (anived during Closed Session) Participating Staff: City Manager Elaine Andersen
City Attorney Steven Wang
City Clerk Christa Freemantle
ADJOURNMENT TO CLOSED SESSION FQR THE FOLLOWING PURPOSES:

L Conference with Legal Counsel - Existing Litigation - Pursuant to Government Code Section 54956.9(d)(1): Eric Weitzelv. City of Folsom, Workers' Compensation Appeals Board Case Nos. ADJ7048246 and ADJ8729812

2. Conference with Real Property Negotiator - Pursuant to Government Code section 54956.8: Exchange a portion of City property located at 814 Comstock Drive, APN 071- 0190-054, consisting of 3,086 sq.ft., for 3,817 sq.ft. of adjacent property. Negotiating Parties: City Manager Elaine Andersen on behalf of the City of Folsom, and Asghar and Patricia Agheli. Under Negotiation: Price and Terms of Exchange

3. Conference with Labor Negotiator - Pursuant to Government Code Section 54957.6. Agency Negotiator: lnterim Human Resources Director John Spittler. Employee Organization: lnternational Union of Operating Engineers, Local 39 Motion by Gouncilmember Sarah Aquino second by Vice Mayor Rosario Rodriguez to adjourn to Glosed Session for the above referenced items. Motion carried with the following roll call vote:

DRAFT - Not fficial antil approued fui the Ci4t Council. Page 23 06/14/2022 Item No.4.

Book 76 Page 249
Folsom City Council
May 24,2022
AYES:

NOES:

ABSENT:

ABSTAIN:

Gouncilmember(s): Chalamcherla, Rodriguez, Aquino, Howell Gouncilmember(s): None
Gouncilmember(s): Kozlowski
Councilmember(s): None

RECONVENE
City Attorney Steven Wang announced that no final action was taken during Closed Session

ADJOURNMENT
The meeting was adjourned at 6:36 p,m

SUBMITTED BY
Christa Freemantle, City Clerk
ATTEST:

Kerri Howell, Mayor
DRAFT - Not fficial until approued fu the Ciry Coancil. Page 24 06/14/2022 Item No.4.

Book 76 Page 250
Folsom City Council
May 24,2022
City Gouncil Regular Meeting

MINUTES
Tuesday, May 24,2022 6:30 PM
cAlrl TO ORDER
The regular City Council meeting was called to order at 6:36 pm with Mayor Kerri Howell presiding.

ROLL CALL:

Councilmembers Present: YK Chalamcherla, Councilmember
Mike Kozlowski, Councilmember
Rosario Rodriguez, Vice Mayor
Sarah Aquino, Councilmember
Kerri Howell, Mayor
Councilmembers Absent:

Participating Staff:

None
City Manager Elaine Andersen
City Attorney Steven Wang
City Clerk Christa Freemantle
Community Development Director Pam Johns
City Engineer Steve Krahn
CFO/Finance Director Stacey Tamagni
Police Chief Rick Hillman (via teleconference)
Fire Chief Ken Cusano
Engineering Manager Brian Reed

PLEDGE OF ALLEGIANCE
The Pledge of Allegiance was recited

AGENDA UPDATE
City Attorney Steven Wang announced that items 10,11 and 12 were continued to a future meeting and items 5 and 14 have been revised.

BUSINESS FROM THE FLOOR:

None
DRAFT - Not fficial until approued fut the Ci4t Coundl. Page 25 06/14/2022 Item No.4.

Book 76 Page251
Folsom City Council
May 24,2022
SCHEDULED P NTATIONS:

1. Presentation by the Sacramento-Yolo Mosquito and Vector Control District General Manager Gary Goodman of the Sacramento-Yolo Mosquito and Vector Control District made a presentation via teleconference and responded to questions from the City Council.

Craig Burnett, Folsom's representative to the Sacramento-Yolo Mosquito and Vector Control District provided additional information and comments.

2. Folsom Plan Area Semi-Annual Report
Community Development Director Pam Johns and City Engineer Steve Krahn made a presentation and responded to questions from the City Council' GONSENT GALENDAR:

Items appearing on the Consent Calendar are considered routine and may be approved by one motion. City Councilmembers may pull an item for discussion.

3. Ordinance No. 1326 - An Uncodified Ordinance of the City of Folsom Approving the Folsom Police Department's Military Equipment Use Policy in Compliance with Assembly Bill 481 (Second Reading and Adoption)

4. pulled for separate vote

5. Resolution No. 10851 - A Resolution Authorizing the City Manager to Execute a Construction Agreement with B&M Builders, lnc. for the lron Point Road Median lmprovement Project, Project No. PW2102 and Appropriation of Funds (amended)

6. Resolution No. 10852 - A Resolution Authorizing the City Manager to Execute an Amendment to the Design and Consulting Services Agreement with R.E.Y. Engineers, lnc. for the Natoma Street Drainage Phase 2 Project, Project No. PW1901 7 . Resolution No. 10853 - A Resolution Authorizing the City Manager to Execute a Construction Agreement with All Phase Construction, lnc. for the Natoma Street Drainage lmprovement Project Phase 2, Project No. PW1901, State Project No. 5288(047) and Appropriation of Funds

8. Resolution No. 10854 - A Resolution Authorizing Staff to Submit Active Transportation Program Grant Applications (Cycle 6) to the California Transportation Commission and the Sacramento Area Council of Governments for the Historic District Connectivity Project g. Resolution No. 10855 - A Resolution Authorizing Staff to Submit Active Transportation Program Grant Applications (Cycle 6) to the California Transportation Commission and the Sacramento Area Council of Governments for the Folsom-Placerville Rail Trail Project
DRAtrT - Not oficialuntil approued fui the Ciry Coancil. Page 26 06/14/2022 Item No.4.

Book 76 Page252
Folsom City Council
May 24,2022

10. Resolution No. 10856 - A Resolution Authorizing the City Manager to Execute a Subdivision lmprovement Agreement and Accept Offers of Dedication for the Mangini Ranch Phase 3 Village No. 1 Subdivision, and Approval of the Final Map for the Mangini Ranch Phase 3 Village No. 1 Subdivision
1 1 . Resolution No. 10857 - A Resolution Authorizing the City Manager to Execute a Subdivision lmprovement Agreement and Accept Offers of Dedication for the Mangini Ranch Phase 3 Village No. 4 Subdivision, and Approval of the Final Map for the Mangini Ranch Phase 3 Village No. 4 Subdivision

12. Resolution No. 10858 - A Resolution Authorizing the City Manager to Execute a Subdivision lmprovement Agreement and Accept Offers of Dedication for the Mangini Ranch Phase 3 Village No. 2 & 3 Subdivision, and Approval of the Final Map for the Mangini Ranch Phase 3 Village No. 2 & 3 Subdivision

13. Resolution No. 10859 - A Resolution Authorizing the City Manager to Execute a Contract with MCM Roofing lnc. for the Folsom City Hall and Folsom Community Center Roof Repair Project

14. Resolution No. 10860 - A Resolution Authorizing the City Manager to Execute a Construction Agreement with Cooper Oates Air Conditioning for the Folsom City Hall Boiler and HVAC Replacement Design-Build Project (amended) Motion by Councilmember Mike Kozlowskisecond by Vice Mayor Rosario Rodriguez, to approve Gonsent Calendar items 3, 6-9, 13, and items 5 and 14 as amended.

Motion carried with the following roll call vote:

AYES: Gouncilmember(s): Ghalamcherla, Kozlowski, Rodriguez, Aquino, Howell NOES: Councilmember(s): None
ABSENT: Gouncilmember(s): None
ABSTAIN: Gouncilmember(s): None
CONSENT LENDAR ITEM PULLED FO R COMMENT:

4. Ordinance No. 1327 - An Uncodified Ordinance to Amend the Zoning Designation for a

7.24-acre Parcel (Lot 1) from M-L PD to R-4 PD and to Amend the Zoning Designation for a 4.68-acre Parcel (Lot 6) from BP PD to R-4 PD for the Folsom Corporate Center Apartments Project (Second Reading and Adoption)
Councilmember Sarah Aquino explained that she pulled this item to recuse herself due to a potential conflict of interest.

Motion by Vice Mayor Rosario Rodriguez second by Councilmember YK Ghalamcherla, to conduct second reading and adopt Ordinance No. 1327.

Motion carried with the following roll call vote:

AYES: Gouncilmember(s): Ghalamcherla, Kozlowski, Rodriguez, Howell DRAFT - Not ffidal until approued b1 the Citlt Coundl. Page 27 06/14/2022 Item No.4.

Book 76 Page 253
Folsom City Council
May 24,2022
NOES:

ABSENT:

ABSTAIN:

Councilmember(s): None
Councilmember(s): Aquino (recused)
Gouncilmember(s): None
PUBLIG HEARING:

15. Resolution No. 10861 - A Resolution Adopting the City Manager's Fiscal Year 2022-23 Operating and Capital Budgets for the City of Folsom, the Successor Agency, the Folsom Public Financing Authority, and the Folsom Ranch Financing Authority CFO/Finance Director Stacey Tamagni made a presentation and responded to questions from the City Council. Police Chief Rick Hillman and Fire Chief Ken Cusano responded to additional questions from the City Council.

Mayor Kerri Howell opened the public hearing.

The following speaker addressed the City Council:
. Judi Alexander regarding budgeting funds for the homeless There being no further speakers, the public hearing was closed.

The City Council discussed the item and asked questions. CFO/Finance Director Stacey Tamagni and City Manager Elaine Andersen responded.

Councilmember YK Chalamcherla expressed concern regarding the Fire Department's overtime budget and recommended using the amount of estimated overtime for additional fire personnel.

After more discussion the City Council agreed to continue the item to the June 14 City Council meeting.

Motion by Gouncilmember YK Ghalamcherla second by Vice Mayor Sarah Aquino, to continue the item to the June 14,2022 Gity Gouncil meeting.

There was more discussion regarding the Fire Department overtime budget and hiring additional personnel.

Motion carried with the following roll callvote:

AYES: Gouncilmember(s): Ghalamcherla, Kozlowski, Rodriguez, Aquino, Howell NOES: Gouncilmember(s): None
ABSENT: Gouncilmember(s): None
ABSTAIN: Gouncilmember(s): None
DR4FT -Not ffidal until approued fut the Ci4t Coundl. Page 28 06/14/2022 Item No.4.

Book76 Page254
Folsom City Council
May 24,2022

CONVENE JOINT MEETING

JOINT CITY COUNCIL AGENDA

JOINT CITY COUNCIL / FOLSOM REDEVELOPMENT SUCCESSOR AGENCY / FOLSOM

PUBLIC FINANCING AUTHORITY / FOLSOM RANCH FINANCING AUTHORITY / SOUTH OF 50 PARKING AUTHORITY MEETING
ROLL GALL:

Councilmembers Present: YK Chalamcherla, Councilmember
Mike Kozlowski, Councilmember
Rosario Rodriguez, Vice Mayor
Sarah Aquino, Councilmember
Kerri Howell, Mayor
Councilmembers Absent None
Participating Staff: City Manager Elaine Andersen
City Attorney Steven Wang
City Clerk Christa Freemantle
GONSENT CALENDAR:

16. Approval of the March 22, 2022 Joint City Council / Redevelopment Successor Agency / Public Financing Authority / Folsom South of 50 Parking Authority / Folsom Ranch Financing Authority Meeting M inutes

17. Receive and File the City of Folsom, the Folsom Redevelopment Successor Agency, the Folsom Public Financing Authority, the Folsom Ranch Financing Authority, and the South of 50 Parking Authority Monthly lnvestment Reports for the Month of March 2022 Motion by Councilmember Mike Kozlowski, second by Vice Mayor Rosario Rodriguez to approve the Consent Calendar.

Motion carried with the following roll call vote:

AYES: Gouncil/Board Member(s): Ghalamcherla, Kozlowski, Rodriguez, Aquino, Howell
NOES: Gouncil/Board Member(s): None
ABSENT: Council/BoardMember(s): None
ABSTAIN: Gouncil/Board Member(s): None

ADJOURNMENT
There being no further business to come before the joint City Council / Redevelopment Successor Agency / Public Financing Authority / Folsom South of 50 Parking Authority / Folsom Ranch Financing Authority, the meeting was adjourned to the regular City Council meeting at 8:40 pm.

DRAI*T - Not ffidal anti/ approued b1t the Ci4t Coundl. Page 29 06/14/2022 Item No.4.

Book 76 Page 255
Folsom City Council
May 24,2022
CITY MANAGER REPORTS:

City Manager Elaine Andersen announced that the City is conducting public outreach for input regarding the future funding gap. She also mentioned the City's emergency order in effect for high fire risk open spaces which are closed to the public; compost available to residents free of charge and the opening of Aquatic Center summer season on May 28th.

CITY COUNCIL COMMENTS:

Vice Mayor Rosario Rodriguez spoke of the upcoming Chamber of Commerce forum regarding business climate and other topics that directly impact our community. She sent condolences to the families of the shooting in Uvalde, Texas.

Councilmember YK Chalamcherla stated that he is participating on the panel to hire a new Cable Commission director. He commented regarding the recent Public Works Day and thanked staff and spoke of attending the CAPS volunteer reception and thanked the volunteers.

Lastly, he commented regarding meeting with residents in American River Canyon area to discuss water restrictions.

Councilmember Mike Kozlowski shared an update of topics at the recent SACOG board meeting. He mentioned the NorCal Special Olympics held at Vista Del Lago High School Councilmember Sarah Aquino requested the following agenda items come to future City Council meetings which all relate to the Folsom Municipal Code: appeals, garage sale regulations and the sidewalk vendor ordinance. She congratulated all the high school graduates.

Mayor Kerri Howell encouraged everyone to slow down and drive safely. She announced the upcoming JPA Connector meeting Friday and gave a Regional Transit board update. She wished everyone a great and safe Memorial Day weekend.

ADJOURNMENT
There being no further business to come before the Folsom City Council, Mayor Kerri Howell adjourned the meeting at 8:53 pm.

SUBMITTED BY
Christa Freemantle, City Clerk
ATTEST:

Kerri Howell, Mayor
DRAFT - Not ffidal until approued fui the Citl Council. Page 30 06/14/2022 Item No.4.
a. iiir,lir! r r i':.'i
Folsom City Council
Staff Re ort

RECOMMENDATION / CITY COUNCIL ACTION
Staff recommends that the Folsom City Council adopt Resolution No. 10862 - A Resolution Calling and Giving Notice of the Holding of a General Municipal Election to be Held on Tuesday, November 8,z}2z,Requesting the Board of Supervisors of the County of Sacramento Consolidate the General Municipal Election with the Statewide General Election, and Establishing Policies for Candidates' Statements.

BACKGROUND:

The term of office for three City Council Members (Council Members Sarah Aquino, Kerri Howe||, and Mike Kozlowski) who were elected as at-large Councilmembers in 2018 will expire in Novemb er 2022. The term of office for two City Council Members (Council Members YK Chalamcherla and Rosario Rodriguez) who were elected as at-large Councilmembers in2020 will expire in November 2024.

The City of Folsom has recently completed the transition to by-district elections, meaning that Councilmembers will no longer be elected at-large by all City residents. Instead, Councilmembers will be elected from five City Council Districts. In the November 2022 I
MEETING DATE: 0611412022
AGENDA SECTION: Consent Calendar
SUBJECT: Resolution No. 10862 - A Resolution Calling and Giving Notice of the Holding of a General Municipal Election to be Held on Tuesday, November 8,2022, Requesting the Board of
Supervisors of the County of Sacramento Consolidate the General Municipal Election with the Statewide General Election, and Establishing Policies for Candidates' Statements
FROM: City Clerk's Department

Page 31 ends

06/14/2022 Item No.5.
election, Councilmembers will be elected from Districts 1, 3, and 5. In the November 2024 election, Councilmembers will be elected from Districts2 and 4.

Candidates.for City Council seats may file a candidate statement which is included in the sample ballot mailed to voters. The candidate statement is a brief description of the candidate, and Elections Code establishes certain legal parameters for the statement's form and content.

POLICY/RULE:

Pursuant to Folsom Municipal Code Section 2.40.010, the date of the General Municipal Election shall be the same date as the Statewide General Election in even numbered years.

Elections Code Section 10400 establishes that, whenever two elections are to be held on the same day, they may be consolidated. In addition, Elections Code Section 10403 sets forth the requirement that jurisdictions file a resolution requesting consolidation with the local county board of supervisors.

Folsom Charter Section 2.01 establishes that City Council members shall be elected to four- year, staggered terms.

Elections Code Section 13307 provides that the governing body of any local agency may adopt regulations pertaining to the materials prepared by any candidate, including costs of the candidate's statement. The candidate's statement fee, which is paid for by the candidates, is set by the Sacramento County Registrar of Voters prior to the election, and County elections staff have advised this fee will be set once the ballot printer provides printing costs.

F'INANCIAL IMPACT:

The Sacramento County Registrar of Voters has estimated the election cost at approximately $51,000. Funds have been included in the proposed FY 2022123 budget to cover this cost.

ATTACHMENT
Resolution No. I 0862 - A Resolution Calling and Giving Notice of the Holding of a General Municipal Election to be Held on Tuesday, November 8,2022, Requesting the Board of Supervisors of the County of Sacramento Consolidate the General Municipal Election with the Statewide General Election, and Establishing Policies for Candidates' Statements Submitted,
2 Christa Freemantle, City Clerk

Page 32 ends

06/14/2022 Item No.5.

RE,SOLUTION NO. 10862
A RESOLUTION CALLING AI\D GIVING NOTICE OF THE HOLDING OF A GENERAL MUNICIPAL ELECTION TO BE HELD ON TUESDAY, NOVEMBER 8,2022,

REQUESTING THE BOARD OF SUPERVISORS OF THE COUNTY OF SACRAMENTO

CONSOLIDATE THE GENERAL MUNICIPAL ELECTION WITH THE

STATEWIDE GENERAL ELECTION, AND

ESTABLISHING POLICIES FOR CANDIDATES' STATEMENTS
WHEREAS, an election will be held within the City of Folsom on November 8,2022, for the purpose of electing three City Council members; and WHEREAS, a Statewide General Election will be held within the County of Sacramento on the same day; and
WHEREAS, Elections Code Section 10403 requires jurisdictions to file with the Board of Supervisors, and a copy with the Registrar of Voters, a resolution requesting consolidation with a statewide election; and
WHEREAS, Section 13307 of the Elections Code of the State of California provides that the governing body of any local agency adopt regulations pertaining to materials prepared by any candidate for a municipal election, including costs of the candidate's statement:

NOW, THEREFORE, BE IT RESOLVED as follows:

SECTION 1. The Folsom City Council hereby requests that the Sauamento County Board of Supervisors consolidate the November 8,2022, General Municipal Election with the Statewide Election to be held on that same date; and
SECTION 2. Thateach candidate for elective office to be voted for at the General Municipal Election to be held in the City of Folsom onNovember 8,2022, may prepare a candidate's statement on an appropriate form provided by the City Clerk. The statement may include the name, age, and occupation of the candidate and a brief description of not more than two hundred (200) words of the candidate's qualifications, as expressed by the candidate. The statement shall not include any party affiliation of the candidate, nor membership or activity in partisan political organizations, The statements shall be filed in with the City Clerk at the time ihe candidate's nomination papers are filed. The statements may be withdrawn, but not changed, during the period for filing nomination papers and until 5:00 P.M. the next working day after the close of the nomination period. The Sacramento County Voter Registration and Elections Department will set the cost of the candidate's statement prior to the election; this fee will be paid to the City of Folsom by the candidate at the time the nomination papers and candidate's statement are filed; and
SECTION 3. That the City of Folsom agrees to reimburse the Registrar of Voters for actual costs accrued for each election, such costs to be calculated by the proration method set forth in the County's current Schedule of Fees and Charges' Resolution No. 10862
Page I of2 Page 33
06/14/2022 Item No.5.

PASSED AND ADOPTED on this 14ft day of June 2022, by the following roll-call vote:

AYES: Councilmember(s):

NOES: Councilmember(s):

ABSENT: Councilmember(s):

ABSTAIN: Councilmember(s):

Kerri M. Howell, MAYOR
ATTEST:

Christa Freemantle, CITY CLERK
ResolutionNo. 10862
Page2 of2 Page 34
06/14/2022 Item No.5.

Folsom City Council
Staff rt

RECOMMENDATION / CITY COUNCIL ACTION
The Environmental and Water Resources Department recommends the City Council pass and adopt Resolution No. 10863 - A Resolution Authorizing the City Manager to Execute a Regional Water Authority Biological Opinion Services and Support Program Agreement and Appropriation of Funds.

BACKGROUND / ISSUE
In September 2021, the Bureau of Reclamation (Reclamation) indicated its intent to engage in the reinitiation of consultation on the coordinated long-term operation (ROC on LTO) of the Central Valley Project (CVP) and the State Water Project, pursuant to the federal Endangered Species Act (ESA). Under the ESA, reinitiation requires the federal agencies to take an updated look at the current and best available science and develop a new Biological Opinion (BiOp) based on the best available data. This effort will result in the development of an Environmental Impact Statement (EIS) and Record of Decision (ROD) pursuant to the National Environmental Policy Act (I.{EPA), as well as a Biological Assessment (BA) that will support BiOps issued by the National Marine Fisheries Service (NMFS) and the U.S. Fish and Wildlife Service (USFWS).

Reclamation has indicated that it will complete a "proposed action," the main project description for evaluation in a BiOp, by the end of 2022. In order for Reclamation to meet this deadline, a description of the proposed action will be needed by June 2022, which will then be 1 MEETING DATE: 6lt4l202l
AGENDA SECTION: Consent Calendar
SUBJECT: Resolution No. 10863 - A Resolution Authorizing the City Manager to Execute a Regional Water Authority Biological Opinion Services and Support Program Agreement and
Appropriation of Funds
FROM: Environmental and Water Resources Department

Page 35 ends

06/14/2022 Item No.6.
technically evaluated until September 2022. Reclamation will then submit an initial draft proposed action to NMFS and USFWS and will have some additional exchange of technical information and refinement until December 2022.

The American River Division of the Central Valley Project (CVP) had actions that were incorporated into the2019 BiOps and included important measures such as the Modified Flow Management Standard and temperature management criteria. It is anticipated the federal agencies will need to reevaluate all elements of the prior BiOps, including those on the American River, as well as new or modified operations that were not included in the 2019 BiOps.

POLICY / RULE
In accordance with Chapter 236 of the Folsom Municigal Code. supplies, equipment, services, and construction with a value of $66,141 or greater shall be awarded by City Council.

ANALYSIS
As part of the development of the BA and the Biops, the Water Infrastructure Improvements for the Nation (WIIN) Act provides that water providers who contract for the delivery of water with Reclamation be included in the development of a new BiOp. This engagement also includes other enforceable arrangements, such as settlement agreements, with Reclamation for the delivery of water. This includes:
. Having the opportunity to submit to and discuss information with U.S. Fish and Wildlife Service and the National Oceanic and Atmospheric Administration (NOAA)for consideration in the development of a biological assessment . Be informed of the schedule for preparing a biological assessment . Be informed of the schedule for preparing a BiOp
. Receive a copy of any draft BiOp and have an opportunity to review and comment on the BiOp
. Having the opportunity to confer with USFWS or NOAA and the applicant about any reasonable and prudent alternatives (RPAs) prior to them being identified . Be informed of how each component of the RPAs will contribute to conserving species and the scientific justification supporting the RPAs. Further, be informed as to why other proposed alternative actions that would have fewer adverse economic and water supply effects were not adequate as an RPA.

It is anticipated that, given current stress CVP-wide due to extended drought conditions and a changing climate, there will be enhanced pressure upon the American River Division, and specifically Folsom Reservoir, to be akey source of waterto balance needs across an expansive water supply system. Thus, it will be critical for water providers in the American River Division to be alert to, and be ready to counter, any modifications that may occur in association with the development of new BiOps that could cause water supply or fisheries-related impacts to Folsom Reservoir or the American River. It will be critical for the region to have qualified 2 Page 36
06/14/2022 Item No.6.
technical resources with the capability to provide hydrologic modeling and temperattxe modeling; analysis and synthesis of data; and qualified resources for timely and efficient program management.

The most effective way to coordinate regionally on the BiOps is to pool resources in the American River Division by having water providers who contract with Reclamation for the delivery of water engage in a subscription program to fund technical and program management support. The Biological Opinion Services and Support (BOSS) program would provide funding to legal support staff, who would contract with needed technical resources. Further, the agreement would fund the Regional Water Authority (RWA) Manager of Strategic Affairs for program management of the BiOps for the region. Estimating nine program participants, the total cost per entity would be $95,750.

The RWA and the Participants desire to work collaboratively to ensure that information provided in support of the American River region's operations are carried out by qualified technical support staff and that all interests from Participants are reflected through a coordinated effort, called the Biological Opinion Services and Support (BOSS) Program ("Program"). The Program will provide the following:
o A coordinated effort to timely respond to information requests from Participants, Reclamation, or other interested parties. o Consolidation and rectification of Participant comments on key documents used to support the BiOps.
o Attendance al meetings related to the development of regulatory documents to support the BiOps and forthcoming ROD.
o Preparation and facilitation ofcorrespondence to appropriate parties. o Conducing modeling for hydrologic,habitat, and temperature conditions. . Analysis and synthesis of technical work.
o Establishment and implementation of a water provider technical team (WPTT) to review and discuss results from various analyses. o Advocacy of American River water provider needs with Reclamation, California Department of Water Resources, USFWS, NMFS, California Department of Fish and Wildlife, or other entities to ensure local interests are being represented
r Ensuring activities occurring outside of the watershed are considered and impacts to the American River watershed are disclosed appropriately. . Legal support services as needed.

FINANCIAL IMPACT
The City's cost share for the Biological Opinion Services and Support Program is $95,750.

This program was not anticipated to be included in the FY 2021-22 Water Operating Fund Budget. Staff is requesting an appropriation of $95,750 to be appropriated in the Water J Page 37
06/14/2022 Item No.6.

Operating Fund (Fund 520) in Fiscal Year 2021-22 for participation in this progfttm. Funds are available in the Water Operating Fund for this appropriation.

ENVIRONMENTAL REVIEW
Execution of this agreement is not considered a project and therefore not subject to CEQA ATT

1. Resolution No. 10863 - A Resolution Authorizing the City Manager to Execute a Regional Water Authority Biological Opinion Services and Support Program Agreement and Appropriation of Funds

2. Regional Water Authority Biological Opinion Services and Support Program Agreement

3. Common Interest and Cost-Share Agreement for Coordinated Participation:

Reconsultation on the Biological Opinion for the Central Valley Project and Related Matters
Submitted,
Marcus Yasutake, Director

ENVIRONMENTAL AND WATER RESOURCES DEPARTMENT
4 Page 38
06/14/2022 Item No.6.

ATTACHMENT 1

Page 39 ends

06/14/2022 Item No.6.

RESOLUTION NO. 10863

A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE A

REGIONAL WATER AUTHORITY BIOLOGICAL OPINION SERVICES AND

SUPPORT PROGRAM AGREEMENT AND APPROPRIATION OF FUNDS
WHEREAS, the City is part of the American River Division of the Central Valley Project (CVP) and holds a contract for the delivery of water from the CVP; and WIIEREAS, the American fuver CVP Contractors are public water agencies who desire to cooperate, coordinate efforts and share costs in order to collectively participate 1n th9 reconsultation of the Biological Opinion for the Coordinated Long-term Operation of the Central Valley Project and the State Water Project; and
WHEREAS' the Regional Water Authority has established the Biological Opinion Services and Support (BOSS) Program pursuant to which individual RWA members can agree to pay certain sumi in return for RWA providing certain project services; and WHEREAS, an additional appropriation of funds in the amount of $95,750 is needed for this agreement and sufficient funds are available in the Water Operating Fund (Fund 520) in Fiscal Y en 2021 -22 for this appropriation; and
WHEREAS, the agreement will be in a form acceptable to the City Attorney:

NOW, THEREFORE' BE IT RESOLVED that the City Council of the City of Folsom Authorizes the City Manager City Manager to Execute a Regional Water Authqrllf Biological Opinion Services ana Suppbrt Program Agreement for a not to exceed fee of $95,750.

BE IT FURTHER RESOLVED that the Finance Director is authorized to appropriate $95,750 for this agreement. The additional appropriation will be from the Water Operating Fund (Fund 520) inthe amount of $95,750.
pASSED AND ADOPTED this 14th day of June 2022,by the following roll-call vote:

AYES: Councilmember(s)
NOES: Councilmember(s):

ABSENT: Councilmember(s)
ABSTAIN: Councilmember(s):

ATTEST:

Resolution No. 10863
Page I of2
Kerri M. Howell, MAYOR

Page 40 ends

06/14/2022 Item No.6.

Christa Freemantle, CITY CLERK
Resolution No. 10863
Page2 of2 Page 41
06/14/2022 Item No.6.

ATTACHMENT 2

Page 42 ends

06/14/2022 Item No.6.

REGIONAL WATER AUTHORITY

PROGRAM AGREEMENT

BIOLOGICAL OPIONION SERVICES AND SUPPORT
This Agreement is made and entered into as of the
-th
day of 20-, by and
between the Regional Water Authority ("RWA"), a joint exercise of powers authority formed under California Government Code section 6500, and following, and the Members and Contracting Entities of RWA listed in Exhibit 1 to this Agreement, upon their execution of this Agreement (who are collectively referred to in this Agreement as "Participants"), to provide for carrying out a project or program that is within the authorized purposes of RWA, and sharing in the cost and benefits by the Participants.

RECITALS
A. RWA is a joint powers authority, formed to serve and represent regional water supply interests and to assist its members in protecting and enhancing the reliability, availability, affordability and quality of water resources.

B. The joint powers agreement ("RWA JPA") pursuant to which RWA was formed and operates, and as was amended on October 8,2013, authorizes RWA to enter into a "Project or Program Agreement," which is defined in the RWA JPA as an agreement between RWA and two or more of its Members or Contracting Entities to provide for carrying out a project or program that is within the authorized purposes of RWA and sharing in the cost and benefits by the parties to the Project or Program Agreement.

C. Article 21 of the RWA JPA states: "The Regional Authority's projects are intended to facilitate and coordinate the development, design, construction, rehabilitation, acquisition or financing of water-related facilities (including sharing in the cost of federal, State or local projects) on behalf of Members and/or Contracting Entities. The Regional Authority may undertake the development, design, construction, rehabilitation, acquisition or funding of all or any portion of such projects on behalf of Members andlor Contracting Entities in the manner and to the extent authorized by such Members and/or Contracting Entities as provided in this Agreement, but shall not accomplish these functions, nor acquire or own water-related facilities in its ownname." D. Article 22 of the RWA JPA states: "Prior to undertaking a project or program, the Members andlor Contracting Entities who elect to participate in a project or program shall enter into a Project or Program Agreement. Thereafter, all assets, benefits and obligations attributable to the project shall be assets, benefits and obligations ofthose Members and/or Contracting Entities that have entered into the Project or Program Agreement. Any debts, liabilities, obligations or indebtedness incurred by the Regional Authority in regard to a particular project or program, including startup costs advanced by the Regional Authority, shall be obligations of the participating Members and/or Contracting Entities, and shall not be the debts, liabilities, obligations and indebtedness of those Members and/or Contracting Entities who have not executed the Project or Program Agreement."

Page 43 ends

06/14/2022 Item No.6.

E. RWA and the Participants desire to carry out a program as more fully described below and share in the costs and benefits of the program, as a Project or Program Agreement as provided for in Articles 2l and22 of the RWA JPA.

F. The Bureau of Reclamation, responsible for the operation of Central Valley Project (CVP) facilities, such as Folsom Reservoir on the American River, has started the reinitiation of consultation on the coordinate long-term operation (ROC on LTO) of the CVP and the State Water Project, pursuant to the federal Endangered Species Act. This effort will result in the development of an Environmental Impact Statement (EIS) and Record of Decision (ROD) pursuant to the National Environmental Policy Act (NEPA), as well as a Biological Assessment (BA) that will support Biological Opinions (BiOps) issued by the National Marine Fisheries Service (NMFS) and the U.S. Fish and Wildlife Service.

G. As part of the development of the BA and the BiOps, the Water Infrastructure Improvements for the Nation (WIIN) Act provides that water providers who contract for the delivery of water with Reclamation be included in the development of a new BiOp. This engagement also includes other enforceable arrangements, such as settlement agreements, with Reclamation for the delivery of water. This includes:

Having the opportunity to submit to and discuss information with U.S. Fish and Wildlife Service (USFWS) and the National Oceanic and Atmospheric Administration (NOAA) for consideration in the development of a biological assessment; Be informed of the schedule for preparing a biological assessment; Be informed of the schedule for preparing a BiOp;
Receive a copy of any draft BiOp and have an opportunity to review and comment on the BiOp;
Having the opportunity to confer with USFWS or NOAA and the applicant about any reasonable and prudent alternatives (RPAs) prior to them being identified; and, Be informed of how each component of the RPAs will contribute to conserving species and the scientific justification supporting the RPAs. Further, be informed as to why other proposed alternative actions that would have fewer adverse economic and water supply effects were not adequate as an RPA.

H. Participants to this Program all contract or have agreements for the delivery of water with Reclamation and have a vested need to ensure that their interests are protected throughout the BiOp development process.

In consideration of the promises, terms, conditions and covenants contained herein, the parties to this Agreement hereby agree as follows:

1. Recitals Incorporated. The foregoing recitals are hereby incorporated byreference.

2. Defined Terms. Terms defined in the RWA JPA will have the same meaning in this Agreement.
o
a
o
a
O
o

Page 44 ends

06/14/2022 Item No.6.

3. Description of the Program. The RWA and the Participants desire to work collaboratively to ensure that information provided in support of the American River region's operations are carried out by qualified technical support staff and that all interests from Participants are reflected through a coordinated effort, called the Biological Opinion Services and Support (BOSS) Program ("Program"). The Program will provide the following:
o A coordinated effort to timely respond to information requests from Participants, Reclamation, or other interested parties.
o Consolidation and rectification of Participant comments on key documents used to support the BiOps, including: white papers, technical documentation, development of alternatives, development of a Proposed Action (PA) for the BA, coordination of EIS scoping comments, Draft and Final EIS comments, the Draft Biops, etc.
o Attendance at meetings related to the development of regulatory documents to support the BiOps and forthcoming ROD.
o Preparation and facilitation ofcorrespondence to appropriate parties. o Conducing modeling for hydrologic,habitat, and temperature conditions. . Analysis and synthesis of technical work.
o Establishment and implementation of a water provider technical team (WPTT) to review and discuss results from various analyses.
. Coordination between the WPTT and the Water Forum to disseminate information, as needed, and ensure a common understanding of any necessary information.
o Advocacy of American River water provider needs with Reclamation, California Department of Water Resources, USFWS, NMFS, California Department of Fish and Wildlife, or other entities to ensure local interests are being represented. o Ensuring activities occurring outside of the watershed, such as those in-Delta or in other CVP divisions, are considered and impacts to the American River watershed are disclosed appropriately.
. Legal support services as needed.

4. Program Committee. The Participants hereby form a Program Committee consisting of one representative (and altemates) designated by each Participant. The Program Committee will meet as necessary from time to time to administer and implement this Agreement on behalf ofthe Participants. The Program Committee will appoint a Chair and Vice-Chair from among its members. A majority of the total members of the Program Committee will constitute a quonrm.

Each member of the Program Committee will have one vote, either by its representative or an alternate. To proceed with a vote to take action, a quorum must be present at a meeting, with a majority of the number present required for an affirmative vote. In no event shall the composition of the Program Committee be such that the membership of the Program Committee constitutes a quonrm of any RWA legislative body.

5. Program Staffing and Resources. RWA will utilize existing staff to implement the

Page 45 ends

06/14/2022 Item No.6.
program, primarily the Manager of Strategic Affairs.

6. Work Products. Participants shall have full access to the work products of the Program, which will be provided upon execution of each member agency of a nondisclosure agreement.

7. Sharing in Program Costs and Benefits. The assessments for each Participant are further described and attached hereto as Exhibit 2 ("Financing Plan"). Each of the Participants shall pay the assessments set forth on Exhibit 2 atthe time of entering the Program and pay such other assessments as are adopted by the Program Committee. In accordance with the provisions of Articles 2l and22 of the RWA JPA, any debts, liabilities, obligations or indebtednessincurred by RWA in regard to the Program will be the obligations of the Participants, and will not be the debts, liabilities, obligations and indebtedness of those Members andlor Contracting Entities who have not executed this Agreement. The total cost for the Program is estimated as $861,750. The breakdown of these costs is to be as follows:

Approximately 45Yo of RWA staff time over the next year with overhead and expenses, beginning at the time of execution of this Agreement: $141,750.

Costs for technical consultants, with contracts to be executed by Bartkiewicz, Kronick, and Shanahan and Placer County Water Agency General Counsel: $700,000.

Legal support services provided by Bartkiewicz, Kronick, and Shanahan for needed legal review and support: $20,000.

Future costs and allocations will bedetermined through a Work Plan approved by the Program Committee.

8. Role of RWA. The RWA will (a) ensure that the interests of Members and Contracting Entities of RWA who do not participate in this Program are not adversely affected in performing this Agreement, (b) provide information to the Participants on the status of implementation of the Program, (c) assist the Program Committee in carrying out its activities under this Agreement, (d) secure consultant support services through a competitive selection process as identified in RWA Policy 300.2, where applicable; and (e) manage consultant support services in completion of the Program.

9. Authorization to Proceed with the Program. The Biological Opinion Support and Services Program is authorized to proceed upon the commitment of $850,000 to fund staff and technical consulting work. Upon execution of this Agreement, the Participants agree to fund their portion of the Program costs in an amount and manner as described in Exhibit 3 ("Financing Plan") to this Agreement.

10. Term. This Agreement will remain in effect for so long as any obligations under this Agreement and/or obligations from other sources of funding secured remain outstanding.

11. Withdrawal. A Participant may withdraw from this Agreement without requiring termination of this Agreement, effective upon ninety days' notice to RWA and the other Participants, a
a
o

Page 46 ends

06/14/2022 Item No.6.
provided that, the withdrawing Participant will remain responsible for any indebtedness incuned by the Program and allocated to the Participant under this Agreement prior to the effective date of withdrawal. If any surplus funds remain after the withdrawing Participant has met all of its financial obligations under this Agreement, then such funds will be returned to the withdrawing Participant in proportion to the total contribution made by each Participant.

12. Amendments. This Agreement maybe amended from time to time with the approval of all current Participants and RWA.

13. Unspent Funds. In the event that RWA has remaining funds left at the conclusion of the work completed through agreements with BKS and Placer County Water Agency, then those funds shall be distributed back equally to BOSS Participants.

14. Privileges and Immunities. All of the privileges and immunities from liability; exemptions from laws, ordinances and rules; and all pension, relief, disability, worker's compensation and other benefits that apply to the activity of officers, agents or employees of RWA or the Participants when performing their respective functions for those agencies will, to the extent permitted by law, apply to them to the same degree and extent while engaged in the performance of any of the functions and other duties under this Agreement. It is further understood and agreed by RWA and the Participants that, notwithstanding anything contained herein, the employees of RWA and of each Participant shall continue to be entirely and exclusively under the direction, supervision and control of the employing party.

15. No Third-Party Beneficiary. RWA and the Participants understand and agree that this Agreement creates rights and obligations solely between RWA and the Participants and is not intended to benefit any other party. No provision of this Agreement shall in any way inure to the benefit of any third person so as to constitute any such third person as a third-party beneficiary of this Agreement or any of its items of conditions, or otherwise give rise to any cause of action in any person not aparty hereto.

16. Liabilities. With respect to this Agreement, RWA and the Participants expressly agree that the debts, liabilities and obligations of RWA and of each Participant shall remain the debts, liabilities and obligations of that party alone and shall not be the debts, liabilities and obligations of any other party to this Agreement, except as may be otherwise set forth herein or in an amendment to this Agreement.

L7. Audits and Accounting. A11 funds provided under this Agreement shall be separately accounted for and maintained, with books and records of such funding open to inspection by the Participants. Funding under this Agreement shall be subject to and consistent with the audit and accounting procedures set forth in Articles 27 and 28 of the RWA JPA.

18. General Provisions. Any notice to be given under this Agreement shall be madeby:
(a) depositing in any United States Post Office, postage prepaid, and shall be deemed received at the expiration of 72 hours after its deposit; (b) transmission by facsimile copy; (c) transmission by electronic mail; or (d) personal delivery. This Agreement shall be governed by the laws of the State of California. The contact information for each Participant with respect to this section of the

Page 47 ends

06/14/2022 Item No.6.

Agreement is set forth in Exhibit 3 ("Notice Information"). This Agreement may be executed by the parties in counterpart and by facsimile or PDF signatures, each of which when executed and delivered shall be an original and all of which together will constitute one and the same document.

19. Signatories' Authority. The signatories to this Agreement represent that they have authority to execute this Agreement and to bind the Participant on whose behalf they executeit.

The foregoing Biological Opinion Services and Support Agreement is hereby agreed to by RWA and the Participants.

Dated: 2022
Marcus Yasutake
City of Folsom
Jim Peifer
Executive Director
Regional Water Authority
Dan York
Board Chair
Regional Water Authority
Andy Fecko
Placer County Water Agency
Michael Peterson
Sacramento County Water Agency
Ansel Lundberg
Sacramento Municipal Utility District
Dan York
Sacramento Suburban Water District
Sean Bigley
City of Roseville
Bill Busath
City of Sacramento
Jim Abercrombie
El Dorado Irrigation District
Ken Payne
El Dorado Water Agency

Page 48 ends

06/14/2022 Item No.6.

List of Aqreement Exhibits
Exhibit 1 - Program Participants
Exhibit 2 - Financing Plan
Exhibit 3 - Notice Information

Page 49 ends

06/14/2022 Item No.6.

EXHIBIT 1

PROGRAM PARTICIPANTS

REGIONAL WATER AUTHORITY

BIOLOGICAL OPINION SERVICES AND SUPPORT PROGRAM
Agency (Proposed)
City of Folsom
City of Roseville
City of Sacramento
El Dorado Irrigation District
El Dorado Water Agency
Placer County Water Agency
Sacramento County Water Agency
Sacramento Municipal Utility District
Sacramento Suburban Water District

Page 50 ends

06/14/2022 Item No.6.

EXHIBIT 2

FINANCING PLAN

REGIONAL WATER AUTHORITY

BIOLOGICAL OPINION SERVICES AND SUPPORT PROGRAM
The fee for each Participant is shown in the table below. A Participant's fee will not be increased without the approval of that Participant.

Proposed Fee Table
Agency Total Fee
City of Folsom $95,750
City of Roseville $95,750
City of Sacramento $95,750
El Dorado Irigation District $95,750
El Dorado Water Agency $95,750
Placer County Water Agency $95,750
Sacramento County Water Agency $95,750
Sacramento Municipal Utility District $95,750
Sacramento Suburban Water District $95,750
Total $861,750

Page 51 ends

06/14/2022 Item No.6.

EXHIBIT 3

NOTICE INFORMATION

REGIONAL WATER AUTHORITY

BIOLOGICAL OPINION SERVICES AND SUPPORT PROGRAM
City of Folsom
Attn: Marcus Yasutake
50 Natoma Street
Folsom, CA 95630
Phone: (916) 461-6161
Email : [email protected]
City of Roseville
Attn: Sean Bigley
2005 Hilltop Circle
Roseville, CA95747
Phone: (916)774-5513
Email: ca.us
City of Sacramento
Attn: Bill Busath
1395 35th Avenue
Sacramento, CA 95822
Phone: (916) 808-1434
Email : [email protected]
El Dorado Irrigation District
Attn: Jim Abercrombie
280 Mosquito Road
Placerville, CA 95667
Phone: (530)622-4513
Email : j [email protected]
El Dorado Water Agency
Attn: Ken Payne
4330 Golden Center Drive, Suite C
Placerville, CA 95667
Phone: (530) 672-6721
Email: [email protected]

Page 52 ends

06/14/2022 Item No.6.

Placer County Water Agency
Attn: Andy Fecko
144 FergusonRoad
Auburn, CA 95603
Phone: (530)823-4965
Email : [email protected]
Sacramento County Water Agency
Attn: Kerry Schmitz
827 7th Street, Room 301
Sacramento, CA 95814
Phone: (916)874-4681
Email: [email protected]
Sacramento Suburban Water District
Attn: Dan York
3701 Marconi #100
Sacramento, CA 95821
Phone: (916) 679-3973
Email: [email protected]
Sacramento Municipal Utility District
Attn: Ansel Lundberg
6301 S Street
Mail Stop A-404
Sacramento, CA 95817 -1899
Phone: (916)732-6919
Email : ansel.lundberg@smud. ore
Regional Water Authority
Attn: James Peifer
5620 Birdcage Street, Suite 180
citrus Heights, cA 95610
Phone: (916) 967-7692
Email : i peifer@rwah2o. org

Page 53 ends

06/14/2022 Item No.6.

ATTACHMENT 3

Page 54 ends

06/14/2022 Item No.6.

COMMON INTEREST and COST-SHARE AGREEMENT
for COORDINATED PARTICIPATION :

RECONSULTATION ON THE BIOLOGICAL OPINION FOR THE

CENTRAL VALLEY PROJECT AIID RELATED MATTERS
This Common Interest and Cost-Share Agreement (Agreement) is entered into by and among the City of Folsom, City of Roseville, City of Sacramento, El Dorado Inigation District, El Dorado Water Agency, Placer County Water Agency, Regional Water Authority, Sacramento County Water Agency, Sacramento Suburban Water District, and Sacramento Municipal Utilities District and made effective on the date the last of the aforementioned parties signs this Agreement.

RECITALS
A. The City of Folsom, City of Roseville, City of Sacramento, El Dorado Irrigation District, El Dorado Water Agency, Placer County Water Agency, Sacramento County Water Agency, Sacramento Suburban Water District, and the Sacramento Municipal Utilities District (collectively the "American River CVP Contractors") are public agencies who hold contrtacts for the delivery of water from the Central Valley Project (CVP) and who desire to cooperate, coordinate efforts and share costs in order to collectively participate in the reconsultation of the Biological Opinion for the Coordinated Long-term Operation of the Central Valley Project and the State Water Project under Section 7 of the Endangered Species Act (BiOp). The Parties desire to provide the technical basis to enable their counsel to provide informed legal advice to the respective Parties and to enable the Parties to identify and pursue appropriate approaches to protect American River water supplies and interests of the American River CVP Contractors, by jointly pursuing technical work to, among other things, provide comments as part of the BiOp reconsultation and otherwise participate in the BiOp reconsultation process. The Parties share a common interest in achieving all of the above.

B. The Regional Water Authority ("RWA") is a joint powers authority formed for the purposes, among others, of serving and representing American River regional water supply interests in protecting and enhancing the reliability, availability, affordability, and quality of water resources in the American River region.

C. Through this Agreement, the American River CVP Contractors and RWA desire to: (i) acknowledge and affirm their common interest to cooperate and coordinate efforts I

Page 55 ends

06/14/2022 Item No.6.
to protect American River water supplies and other common interests as part of the BiOp reconsultation process; (ii) establish cost-sharing arrangements for related consultant work and expenses; and (iii) provide for the management of the cooperative and coordinated effort contemplated by this Agreement.

D. The American River CVP Contractors and RWA desire, based on their common interests, to cooperate, coordinate, and share information related to the BiOp reconsultation process, while continuing to preserve, to the fullest extent possible, the protections of the attorney-client privilege, work product privilege, common-interest doctrine, deliberative process privilege, executive privilege, or any other privilege or protection existing under state or federal law.

AGREEMENT
NOW, THEREFORE, in consideration of the above recitals, and the mutual covenants and conditions contained herein, the American River CVP Contractors and RWA agree as follows:

1. Manaeement of Coordinated Effort. The American River CVP Contractors desire to have RWA serve as the project manager for this coordinated effort. RWA agrees to act as the project manager for this coordinated effort, provided that RWA is reimbursed for its cost in acting as project manager. All costs for RWA's role as project manager will be funded through RWA's Biological Opinion Services and Support (BOSS) Program. As provided in Paragraph 2(a), allAmerican River CVP Contractors participating in this coordinated effort must also be a party to Biological Opinion Services and Support (BOSS) Program Agreement.

2. Cost-Sharins.
(a) Cost Sharing for RWA's Project Management Services. RWA has established the Biological Opinion Services and Support (BOSS) Program pursuant to which individual RWA members can agree to pay certain sums in return for RWA providing certain project services. At all times that an American River CVP Contractor is participating in the coordinated efforts contemplated by this Agreement, that American River CVP Contractor shall also be a party to the Biological Opinion Services and Support (BOSS) Program Agreement. In the event an American River CVP Contractor fails or ceases to be a party to the Biological Opinion Services and Support (BOSS) Program Agreement, that American River -2-

Page 56 ends

06/14/2022 Item No.6.

CVP Contractor will be deemed to have withdrawn from this Agreement pursuant to Paragraph

5. (b) Cost Sharing for Consultant Work. The American River CVP Contractors desire to share in the costs of consultant work that will be required as part of the Parties' activities related to the BiOp reconsultation process. The total obligation of the American River CVP Contractors to fund the consultants' work on matters contemplated by this Agreement shall not exceed $IAMOIJNT] without written amendment to this Agreement. The American River CVP Contractors' respective percentage shares of the costs and fees for consultant work under this Agreement are set forth in Exhibit A to this Agreement. RWA shall not be responsible for any consultant costs under this Agreement.

3. Steering Committee: Retention and Direction of Consultants. (a) Steering Committee. The American River CVP Contractors will each appoint a representative to a Steering Committee, which will make decisions for the American River CVP Contractors concerning work by consultants under this Agreement and provide direction to RWA in managing the coordinated effort. The Steering Committee will also make decisions on matters related to executing strategy and policy matters. The Steering Committee generally will meet at least once a month during this Agreement's term. Unless specifically provided otherwise herein, an affirmative vote by 213 of all members of the Steering Committee shall be required for all decisions contemplated by this Agreement. The Steering Committee may vote by e-mail provided that all Steering Committee members are included in the circulation list for those e-mails.
(b) Retention. Direction and Compensation of Consultants. The American River CVP Contractors will jointly authorize one or more of the American River CVP Contractors' legal counsel to retain consultants to perform scopes of work as approved by the Steering Committee, subject to applicable law for the confidentiality and protection of the work performed and work products produced by consultants. Retention of a consultant under this Agreement by an American River CVP Contractor or its counsel will not prevent that consultant from performing work for another American River CVP Contractor or RWA on matters not included in scopes of work authorized under this Agreement. The American River CVP Contractors, and not their legal counsel, collectively will be responsible for compensating -J-

Page 57 ends

06/14/2022 Item No.6.
consultants retained under this Agreement according to their respective shares as set forth in Exhibit A.
(c) Management of Consultants' Work. RWA will manage all work by consultants under the direction of the Steering Commiffee. RWA will ensure that its communications with consultants comply with this Agreement's confidentiality arrangements. Provided that RWA's manager of the Biological Opinion Services and Support (BOSS) Program and all American River CVP Contractors' legal counsel are included on the relevant communications, Steering Committee members may have direct contact with consultants and consultants may circulate information and drafts directly to Steering Committee members.

4. Cost-Sharing Upon Addition of Parties. A new American River CVP Contractor may be added to this Agreement with: (i) approval by all members of the Steering Committee, and (ii) a written commitment by the new American River CVP Contractor to pay its proportionate share of all of the consultants' costs and fees incurred for the applicable scope or scopes of work by consultants, including work already performed under the applicable scope or scopes of work. Upon the addition of a new American River CVP Contractor to the Agreement, that new American River CVP Contractor's share, and the shares of the pre- existing American River CVP Contractors, of any costs and fees incurred in relation to the applicable scope or scopes of work will be as determined by the Steering Committee prior to the new American River CVP Contractor's admission into this Agreement'

5. Withdrawal. Removal. and Cost-Sharing.
(a) Withdrawal. Any American River CVP Contractor may withdraw from this Agreement at any time; provided, however, in the event that an American River CVP Contractor withdraws after the Steering Committee has authorized consultants to proceed with certain scopes of work and related task orders, the withdrawing American River CVP Contractor shall remain obligated for payment of its proportionate share of the costs for such authorized work completed as of the date of the American River CVP Contractor's withdrawal. Written notice of withdrawal shall be sent to all members of the Steering Commiffee. A withdrawing American River CVP Contractor shall not receive any Joint Defense Materials (as defined in Section 8) produced after the date of its written notice of withdrawal, whether or not those Joint Defense Materials reflect consultant work performed before the date of that written notice of withdrawal.
-4-

Page 58 ends

06/14/2022 Item No.6.
(b) Removal. An American River CVP Contractor may be removed from this Agreement at any time by a three-fourths (3/a) vote of the remaining American River CVP Contractors; provided, however, in the event that an American River CVP Contractor is removed from this Agreement after the Steering Committee has authorized consultants to proceed with certain scopes of work and related task orders, the removed American River CVP Contractor shall remain obligated for payment of its proportionate share of the costs for such authorized work completed as of the date of the American River CVP Contractor's removal. A removed American River CVP Contractor shall not receive any Joint Defense Materials (as defined in Section 8) produced after the date of its removal, whether or not those Joint Defense Materials reflect consultant work performed before the date of that removal.

6. Term. This Agreement shall remain in effect until either of the following events occurs: (a) a majority of the Parties withdraw from the Agreement; or (b) the Steering Committee votes, by a two-thirds majority, to terminate this Agreement.

7. Billing Procedures. For all approved scopes of work by consultants under this Agreement, RWA will have the responsibility for collecting and managing each American River CVP Contractor's contribution of funds to pay for that work; processing invoices submiffed by the consultants pursuant to the approved scopes of work and budgets; preparing invoices to the American River CVP Contractors based on the shares specified in Exhibit A or any future cost-sharing allocation approved by the American River CVP Contractors; and for maintaining an accurate accounting of this administration of funds. The American River CVP Contractors will make payments on invoices presented by RWA within 30 days of the date of the specific invoice.

8. PrivilegedandConfidentialCommunications.
(a) For purposes of this Agreement, "Joint Defense Materials" includes, but is not limited to, all communications (including communications related to the above- referenced proceedings made prior to the execution of this Agreement), factual materials, mental impressions, legal analyses, theories or strategies, memoranda, reports, notes, emails or any other communications or documents that are protected from disclosure by the attorney-client privilege, work product privilege, deliberative process privilege, executive privilege, common-interest doctrine joint prosecution/defense doctrine, privileges regarding -5-

Page 59 ends

06/14/2022 Item No.6.
mediation or settlement communications, or any other privilege or protection existing under state or federal law, and that are exchanged among the American River CVP Contractors, RWA, and/or their respective counsel in connection with their cooperative efforts related to the maffers described in this Agreement's recitals.
(b) The American River CVP Contractors and RWA will maintain as confidential all Joint Defense Materials. Disclosure of Joint Defense Materials shall be limited to the American River CVP Contractors and their employees and contractors as well as any counsel and consultants retained by the American River CVP Contractors, or on behalf of the American River CVP Contractors, for the purpose of maintaining a joint defense with respect to the matters described in this Agreement's recitals. RWA, as a public entity separate from its members, shall maintain as confidential all Joint Defense Materials within RWA as a separate public entity. Joint Defense Materials shall not be made available to RWA members that are not party to this Agreement.
(c) Any Joint Defense Materials shared or transmitted by or between American River CVP Contractors andlor RWA should be clearly designated with the label "CONFIDENTIAL: JOINT DEFENSE MATERIALS" or a substantially similar label referencing "joint defense." However, the failure to include such designation shall not preclude such materials from being afforded the protections of this Agreement, and shall not be construed to constitute a waiver of any privilege or other protection. (d) Each American River CVP Contractor and RWA shall take all appropriate measures to ensure that any person who is granted access to Joint Defense Materials is familiar with the terms of this Agreement and complies with those terms. (e) Except where required by the order of a court of competent jurisdiction, or by the prior written consent of the remaining American River CVP Contractors, neither an American River CVP Contractor nor RWA will disclose to non-Parties any Joint Defense Materials that it has received from another American River CVP Contractor or RWA. (0 Each American River CVP Contractor and/or RWA shall notify the party that generated any Joint Defense Materials and all remaining American River CVP Contractors of any request to disclose the Joint Defense Materials to any non-Party (whether pursuant to the California Public Records Act or other authority), or of any proceeding before any court, -6-

Page 60 ends

06/14/2022 Item No.6.
administrative agency, or tribunal to compel the disclosure of such Joint Defense Materials, as soon as practicable after receipt of such request or the initiation of such proceeding. If an American River CVP Contractor or RWA becomes subject to any judicial or administrative order to compel release of Joint Defense Materials, that American River CVP Contractor or RWA shall promptly notifu the party that generated the materials and all remaining American River CVP Contractors. The purpose of these notifications is to provide the party that generated the Joint Defense Materials or any remaining American River CVP Contractor an opportunity to take such steps as they may deem appropriate to protect the Joint Defense Materials.
(g) The sharing of Joint Defense Materials among the American River CVP Contractors and/or RWA is not intended to and will not constitute a waiver of any privilege or other protection of confidentiality, including but not limited to the attorney-client privilege, work product privilege, common-interest doctrine, deliberative process privilege, executive privilege, privileges relating to mediation or settlement communications, or any other privilege or protection existing under state or federal law. (h) Execution of this Agreement constitutes the mutual agreement of the American River CVP Contractors and RWA that any sharing of Joint Defense Materials among themselves is, pursuant to Evidence Code section9l2, subdivision (d), and other applicable authorities, reasonably necessary for the accomplishment of the American River CVP Contractors' and RWA's common purposes as described in this Agreement. Any sharing of Joint Defense Materials among the American River CVP Contractors and/or RWA is in reliance on this Agreement and the protections that arise from the parties' common interests related to the matters described in Recital B to this Agreement. (i) If an American River CVP Contractor or RWA withdraws from this Agreement, the provisions of this Agreement shall continue to apply to the Joint Defense Materials that the party received or sent during the time period when that party was a party to this Agreement, including without limitation the duty to maintain those materials' confidentiality under Section 8(b).

C) If this Agreement is terminated for any reason, the Joint Defense Materials shared pursuant to this Agreement shall remain subject to all privileges cited herein and any other applicable confidentiality protections.
1

Page 61 ends

06/14/2022 Item No.6.

9. Attorney-Client Relatiotshtps. The American River CVP Contractors and RWA are represented by their respective legal counsel in connection with the above-referenced proceedings. A party's legal counsel will not have an attorney-client relationship with any other party to this Agreement as a result of that legal counsel's participation in discussions and actions related to the parties' cooperative efforts on the above-described proceedings.

Similarly, no legal counsel will have a duty of loyalty or confidentiality to any other American River CVP Contractor or RWA other than that legal counsel's specific client(s), and consequently, no American River CVP Contractor may seek to disqualify the legal counsel for another American River CVP Contractor as a result of the legal counsel's participation in discussions and actions related to the parties' cooperative efforts under this Agreement.

10. Representations. The individuals signing this Agreement in a representative capacity warrant that they have the authority to do so on behalf of the entity or entities they represent, and further agree that as representatives ofthe entity or entities that they respectively represent, they themselves are bound by all terms of this Agreement. 1 1. Entire Agreement. This Agreement and any later-approved amendments or exhibits constitute the entire agreement of the parties with respect to the subject matter of this Agreement and supersede any prior oral or written agreement, understanding, or representation relating to the subject matter of this Agreement.

12. Counterparts. This Agreement may be executed in counterparts, each of which shall be deemed an original irrespective of the date of the execution, and said executed counterparts shall together constitute one and the same Agreement. Further, facsimile or .PDF copies of signatures shall be as effective as original signatures for evidencing execution of this Agreement. To ensure that each party has a full copy of this Agreement, upon a party's initial execution of this Agreement, that pafi shall transmit a copy of its signature to its legal counsel, who shall transmit copies of that copy to all other legal counsel under this Agreement.
1 3. Notices. All notices and other communications required to be given to a party under the terms of this Agreement (a) shall be in writing; (b) shall be personally delivered, sent via first class mail, or transmitted by facsimile or email with confirmation of receipt; and (c) shall be directed to such party at the address, facsimile number or email address specified 8-

Page 62 ends

06/14/2022 Item No.6.
below, or at such other address, facsimile number or email address as such party may hereafter designate by notiee in acoordance with this Section.

IN WITNESS WHEREOF, the Parties hereto have executed this Common Interest and Cost- Share Agreement for Coordinated Participation: Reconsultation on Biological Opinion for the Central Valley Project and Related Matters.

EXHIBT A
Cost
Percent\American River CVP Contn@ \
L7,LLA/O
\City of Folsom |t \
lK.11%City of Roseville
W.1%City of Sacramento
Lv
LL.LIOAEl Dorado lrrigation District tr\ \,
IL.LLo/oEl Dorado Water Agecny
\\- \
11-.Ll/oPlacerCountywat@. \ ^1J\ !
Sacramentocou@aterac\$ V ! LL,LL%
tL,LL%sacramento suburblSler oj@l- \
I
Sa Lt.tto/6
-9-

Page 63 ends

06/14/2022 Item No.6.

This page is intentionally left blank.

Page 64 ends

06/14/2022 Item No.6.
i l;-i,'-rtll:\'f
ai.::;tr,!1.(a .. ;.r,t. 'j
Folsom City Council
Staff R ort

RECOMMENDATION / CITY COUNCIL ACTION
The Environmental and Water Resources Department recoflrmends the City Council pass and adopt Resolution No. 10864 - A Resolution Authorizing the City Manager to Execute an Agreement with E Source Companies, LLC to Complete the City of Folsom's Water Loss Control Program and Appropriation of Funds.

BACKGROUND / ISSUE
The Environmental and Water Resources (EWR) Department is requesting that E Source Companies,LLC provide professional services to complete the City's Water Loss Control Program. The City's water distribution system consists of approximately 400 miles of water pipes and is comprised of transmission mains, distribution mains, service lateral connections (approximately 23,000), blow-offs, fire hydrants, backflow preventors, valves, and other appurtenances. The City's water pipes range in size from l-inch service lines to 24-inch transmission mains.

The Water Loss Control Program will include a review of previous water audits completed by the City, source meter accuracy testing, billing data assessment, meter accuracy testing recommendations, an analysis of real and apparent losses for the City, the appropriate leak detection survey frequency, and an analysis of Senate Bill 555 water loss standards relative to the City's real and apparent losses and input values to the State Economic Water Loss Model. 1 MEETING DATE: 611412022
AGENDA SECTION: Consent Calendar
SUBJECT: Resolution No. 10864 - A Resolution Authorizing the City Manager to Execute an Agreement with E Source Companies, LLC to Complete the City of Folsom's Water Loss Control Program and Appropriation of Funds
FROM: Environmental and Water Resources Department

Page 65 ends

06/14/2022 Item No.7.

This will also include support to calculate revised proposed standards for the City to submit to the State for approval.

The City issued a Request for Proposals (RFP) to provide professional services to complete the City's Water Loss Control Program. Upon evaluation of qualifications, experience, cost, and overall best value, City staff recommends authorizing the City Manager to execute an agreement with E Source Companies, LLC to complete the Crty's Water Loss Control Program.

POLICY / RULE
In accordance with Chapter 2.36 of the Folsom Municipal Code. supplies, equipment, services, and construction with a value of $66,141 or greater shall be awarded by Ctty Council.

ANALYSIS
The City issued the RFP on February 28, 2022 for the Water Loss Control Program and received three proposals. EWR staff evaluated the proposals based on the consultant's understanding of the background and requirements of the project, relevant project experience, the qualifications and experience of the consultant's team, and proposal costs. Proposal costs were submified under a separate sealed envelope and were not opened until after the evaluation was completed based on qualifications and experience of the project team. The proposals consisted of the following tasks:
o Program Management
o Meter data assessment and gap analysis
o Water audit reviews
o Volumetric source and production meter testing
o Customer meter testing assessment and development
o Rel and apparent loss component analysis
o Senate Bil1555 support and standards response
o Final report
During the review of the submitted proposals, EWR staff identified E Source Companies,LLC as having the relevant project experience and qualifications and would provide the best value to the City. Table 1 below outlines the scoring prior to including the project costs. The evaluation criteria included the consultant's project understanding and approach, qualifications and experience, and project team. The maximum number of points that could be eamed based on the evaluation criteria (not including costs) was 75 points.

Table I. Consultant scoring prior to reviewing the costs of the proposals 2 60 347 56.859 52 58 55M.E. Simpson 57
50 362 60.363 69 57 55E Source 68
356 s9.350 53 48 63Black & Veatch 64 68

Page 66 ends

06/14/2022 Item No.7.

After reviewing the proposals based on consultant's project understanding and approach, qualifications and experience, ffid project team, EWR staff reviewed total project costs.

Proposal costs from each consultant were required to be submitted under a separate sealed envelope. Table 2 shows the companies that submitted proposals, their fees, and total hours to complete the project.

Table 2. Consultant proiect costs and hours associated with the RFP.

Based on the consultant's understanding of the background and requirements of the project, relevant project experience, the qualifications and experience of the consultant's team, their, proposal costs, and overall best value to the City, EWR staff proposes using E Source Companies , LLC for these services for a not-to-exceed amount of $143,320. Table 3 below shows the final scores with the inclusion of project costs.

Table 3. Consultant overall scoring including proiect costs.

FINANCIAL IMPACT
The Environmental and Water Resources Department recommends that the contract be awarded to E Source Companies, LLC for a not-to-exceed amount $143,320. EWR staff is requesting an appropriation of $143,320 to be appropriated in the Fiscal Year 2021-22 Water Operating Fund (Fund 520) budget . Funds are available in the Water Operating Fund for this appropriation.

ENVIRONMENTAL REVIEW
This project is categorically exempt from environmental review under the California Environmental Quality Act as noted in Title 14 - California Code of Regulations, Chapter 3 - Guidelines for Implementation of the California Environmental Quality Act, Article 19 - Categorical Exemptions, Section 15301 - Existing Facilities.

ATTACHMENT
ResolutionNo. 10864 - A Resolution Authorizingthe City Manager to Execute an Agreement with E Source Companies ,LLCto Complete the City of Folsom's Water Loss Control Program and Appropriation of Funds
a)
638S154,930M.E. Simpson
776S143,320E Source
880s199,500Black & Veatch

76.2 8t.2 468.2 78.O80.2 73.2 79.2M.E. Simpson 78.2
75 512 85.388 94 82 80E-Source 93

79.5 455 75.876.5 69.s 64.5Black & Veatch 80.s 84.5

Page 67 ends

06/14/2022 Item No.7.

Submitted,
Marcus Yasutake, Director

ENVIRONMENTAL AND WATER RESOURCES DEPARTMENT
4 Page 68
06/14/2022 Item No.7.

RE,SOLUTION NO. I.0864

A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE AN

AGREEMENT WITH E SOURCE COMPANIES, LLC TO COMPLETE

THE CITY OF FOLSOM'S WATER LOSS CONTROL PROGRAM

AND APPROPRIATION OF FUNDS
WHEREAS, this project consists of completing a water loss control program; and WHEREAS, the Environmental and Water Resources Department issued a Request for Proposals on February 28,2022 for this project; and
WHEREAS, E Source Companies, LLC by reason of their past experience, abilities for performing these types of services, and overall best value for these services, is qualified to perform the required water loss control program; and
WHEREAS, an additional appropriation of funds in the amount of $143,320 is needed for this agreement of $143,320 and sufficient funds are available in the Water Operating Fund (Fund 520) for this appropriation; and
WHEREAS, the agreement will be in a form acceptable to the City Attorney:

NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Folsom authorizes the City Manager to execute an agreement with E Source Companies, LLC for the City of Folsom's Water Loss Control Program and Appropriation of Funds; and, BE IT F'URTHER RESOLVED that the Finance Director is authorized to appropriate $143,320 for this agreement. The appropriation will be from the Water Operating Fund (Fund 520) in the amount of $143,320.

PASSED AND ADOPTED this 14ft day of June,2022, by the following roll-call vote:

AYES:

NOES:

ABSENT:

ABSTAIN:

Councilmember(s):

Councilmember(s):

Councilmember(s):

Councilmember(s):

Keni M. Howell, MAYOR
ATTEST
Christa Freemantle, CITY CLERK
Resolution No. 10864
Page I of I Page 69
06/14/2022 Item No.7.

This page is intentionally lefr blank.

Page 70 ends

06/14/2022 Item No.7.

Folsom City Council
Staff Re rt

RECOMMENDATION / CITY COLINCIL ACTION
The Fire Department recommends that the City Council pass and approve Resolution No.10865 - A Resolution Authorizing Public Fireworks Displays during the Annual Folsom Pro Rodeo Activities on July 1, July 2, and July 3,2022.

BACKGROUND / ISSUE
The annual Folsom Pro Rodeo is scheduled for July 1, July 2, and July 3, 2022, at Rodeo Park, with a proximate firework display each night.

The Fire Department is coordinating the safety requirements for these fireworks displays with the Greater Folsom Partnership and the California State Fire Marshal's Office. The licensed firm of Fireworks & Stage FX America has been secured by the Greater Folsom Partnership to operate these fireworks displays.

POLICY / RULE
Section 9.36.020 of the Folsom Municipal Code states that public displays of fireworks may only be held when authorized by resolution of the City Council, after recommendation of the Fire Chief, and when under the supervision of a licensed pyrotechnic operator. 1 MEETING DATE: 6lt4/2022
AGENDA SECTION: Consent Calendar
SUBJECT: Resolution No. 10865 - A Resolution Authorizing Public Fireworks Displays During the Annual Folsom Pro Rodeo
Activities
FROM: Fire Department

Page 71 ends

06/14/2022 Item No.8.

ANALYSIS
A public display of fireworks is proposed by the sponsor of the event to be fired each night at the conclusion of the rodeo. Staff has reviewed all safety issues relative to public fireworks display and is working with the Greater Folsom Partnership and Fireworks & Stage FX America to mitigate any potential issues. Staff believes that these mitigation measures will reasonably satisff the safety concerns.

FINAI\CIAL IMPACT
There is no fiscal impact as the overtime staff costs for the required fire safety officer standby each night will be paid by the Greater Folsom Partnership.

ENVIRONMENTAL REVIEW
There are no foreseeable environmental impacts.

ATTACHMENTS

1. Resolution No. 10865 - A Resolution Authorizing Public Fireworks Displays during the Annual Folsom Pro Rodeo Activities

2. Fire Department Permit Application from Fireworks & Stage FX America Submitted,
Ken Cusano, Fire Chief
)

Page 72 ends

06/14/2022 Item No.8.

ATTACHMENT 1

Page 73 ends

06/14/2022 Item No.8.

RESOLUTION NO. 10865

A RESOLUTION AUTHORIZING PUBLIC FIREWORKS DISPLAYS

DURING THE ANNUAL PRO RODEO ACTIVITIES
WHEREAS' on the evenings of July 1, July 2, and July 3, 2022, the Folsom Chamber of Commerce will be sponsoring the annual Folsom Pro Rodeo at the Dan Russell Arena; and WHEREAS, Folsom Municipal Code Section 9.36.020 authorizes the public display of fireworks; and
WHEREAS, the City of Folsom wishes to support the festivities of our nation's independence, as well as family-oriented activities within the community, NOW, THEREFORE, BE IT RESOLVED that the City Council authorizes this public display of fireworks to celebrate this special occasion, with the recommendation of the Fire Chief, and under the supervision oflicensed pyrotechnic operators.

PASSED AND ADOPTED this 14ft day of June 2022,by the following roll-call vote:

AYES:

NOES:

ABSENT:

ABSTAIN:

Council Member(s):

Council Member(s):

Council Member(s):

Council Member(s):

Kerri M. Howell, MAYOR
ATTEST:

Christa Freemantle, CITY CLERK
Resolution No. 10865
Page I of I Page 74
06/14/2022 Item No.8.

ATTACHMENT 2

Page 75 ends

06/14/2022 Item No.8.

FOLSOM

FIREDBPARTMENT
S35 Glenn Drive Folsom, CA gS6go
Office (g$) q6v63oo Fax (g16) g8+-Zo8t
wwwrfolsotn.ca.us
F (}LS(}nd

FIRE SAFETY OFFICER SERVICE AGREEMENT
!'ircrorks E Stage El( AncriceAPPLICA}.IT:

TA)( rD/SS#:

ADDRESS:
45-533{907
PO Box {88 Lakeaide, CA 920{0
TELEPHONE: 519-938-8277
It has determined bythe Fire Chief, in accordance with City of Folsom Municipal Codg lhapter 8.36 (Folsom Fire Code S roZ.8) that provision must be made for Fire Safety Officer Services at the following event/activity:

Date(s) Start Time Finish Time Total Hours
7/L-114 6:00pm L0:00pn {.0
LOCATION OF EVENT: Folcom Rodso
TYPEOFEVENT: Pyrotochnics for Folson Rodco
The Fire Chief hereby agrees to furnish, and Applicant hereby agrees to accept and pay for, the requisite Fire Safety Officer Services subject to the following terms and conditions:

1. Theevent/activitywillrequireapproximately 1z noursofserviceby 1 FireSafetyOfEcer(s), to be provided at an hourly rate of $94.to per houri

2. In the event additional hours of Fire Safety Officer services are required by the length and/or nature of the event/activity, such additional servicei shall be provided by the Fire Department at the same hourly rate(s) as aforesaid;
g. The Folsom Fire Department shall bill by invoice for the aforesaid services by invoice; The Applicant shall remit the full sum due and owing within thirfy (go) da;a of the date of the invoice. ilulia Androwc, Officc 512s12022
of (If authorized representatiue, give title) Date
Signature of Fire Department Representative (include title) Date Working Together to Provide Superior Services in a Safe, Thorough, and Efficient Manner

Page 76 ends

06/14/2022 Item No.8.

FOLSOM

FIRE DEPARTMENT
53S Glenn Drive Folsom, CA 9563o
Office (g16) +6t-63oo Fax (g16) gB+-ZoBt
www.folsotn.ca.us
]FO]LS(DN4T

FIRE DEPARTMENT PERMIT APPLICATION

OPERATIONAL PERMIT
ctaY of
BUSINESS NAME (Print) Fireworkg & SEage Fx Anerica
ADDRESS PO Box 488 Lakeside, CA 92040
APPLICANT NAME Ju1ie Andrews

BILLINGADDRESS (IF

DIFFERENT)
TELEPHONE NUMBER 619 -938-8277
E-MATL o f f ice@f ireworkgameri ca. colt
ASTIVITY DESCRIPTION Pyrotechnics for Fo1eon Rodeo
A property owner or owner's authorized agent who intends to conduct an operation or business, or install or modify systems and equipment that are regulated by the California Fire Code, or to cause any such work to be performed, shall first make application to the fire code official and obtain the required permit. (CFC roS) Conditions of Permit
The conditions, surroundings, and arrangements for the operation(s) or activities subject to this permit shall be in accordance with all applicable regulations. The premises shall be subject to periodic inspection by the City of Folsom to ensure compliance with the applicable regulations and any condition(s) imposed. The permit is subject to revocation for failure to comply with those regulations and any specific conditions that are in effect at the time of inspection.

In obtaining a fire department permit the applicant understands and acknowledges that Folsom Fire Department has the right to enter and inspect that for which the permit is issued for compliance within the rules and regulations enforced by the City of Folsom. The applicant acknowledges that right and agrees to pay all costs incurred by the City of Folsom in securing any judicial writ or inspection warrant to fulfill that right wherein the applicant fails to give consent for inspection.

Application is made to Folsom Fire Department for inspection and approval of the described operation or activity, which will conform to all applicable standards. No operation or activity requiring a permit will be performed until a Fire Department permit is received. It is understood that working without approved plans and a permit will result in delays and additional fees.

Working Together to Provide Superior Services in a Safe, Thorough, and Efficient Manner

Page 77 ends

06/14/2022 Item No.8.

Page z of z
FIRE CODE PERMIT FEES (To operate, conduct, perform, store, or use the following):
" Includes initial fire and life safety inspection and one re-inspection. ** In addition to fire and life safety inspection(s), these processes may also require a construction plan review. Plan review fees are based on the project's valuation or on third-party plan review costs; whichever is higher.

TOTAL FEE(S) DUE $
MAKE CIIECKS PAYABLE TO :

PAYMENT RECEIWD:

USE ONLY)

CHECKNUMBER

PERMIT NUMBER

CITYOFFOI,SOM

FOISOM FIRE DEPARTMENT

ACSIS RECEIVABLE
535 GLENN DRIVE
FOLSOM, CA95630
Click here to Submit by Email
(Attach this fom and any
plans to the email)
Operational Permits" ($r85 each) (Check One or More)
Activities in Hazardous Fire Areas or Gas-fueledVehicles or Equip in Bldgs.

Aerosol Products Storage/Handling (LP) Gas Storage and Use** Amusement Buildings Magnesium
Aviation Facilities Miscellaneous Combustible Storage (z5oo+ sq. ft .) Carbon Dioxide Systems (roo+ pounds) Mobile Fueling of Hydrogen-Fueled Vehicles Carnivals and Fairs Mo Food Preparation Vehicles
Cellulose Nitrate Film Motion Picture Filming
Christmas Tree Lots Motor Vehicle Fuel Dispensing Facilities Combustible Dust-Producing Operations Open Burning
Combustible Fiber Storage/ Handling Open Flames and Torches Compressed Gases Storage/Handling"" Open Flames and Candles Covered and Open Mall Buildings Organic Coatings
Cryogenic Fluids Storage/ Handling"" Places of or more people) Cutting & Welding Production Facilities (Live Audiences) Dry Cleaning x Pyrotechnics / Special Effects Material
Exhibits and Trade Shows Pyroxylin Plastics Storage/Handling Explosives Storage/Handling Refrigeration Equipment Storage/Handling Fire Hydrants and Valves (Including private) Repair Garages Flam. /Comb. Liquids Storage and Pipelines"" Rooftop Heliports Floor Finishing (35o+ sq.ft.) Spralng or Dipping*"
Fruit & Crop Ripening Storage of Scrap Tires and Tire Byproducts Fumigation/ Insecticidal Fo gging Temporary Membrane Structures and Tents** Hazardous Materials Storage/Handling"" Tire Rebuilding Plants Hazardous Production Material (HPM) Facilities Waste Handling High Piled Combustible Storage (5oo+ sq. ft.)"" Wood Products Storage/Handling Hot Work Operations Expedited Service Fees (r.5 X Regular Fee) Industrial Ovens** Technical Assistance / Third Party (Actual Cost) Lumber Yards and Woodworking Plants Re-Inspection (z"it and subsequent) $zz8 each Working Together to Provide Superior Services in a Safe, Thorough and Efficient Manner.Page 78 06/14/2022 Item No.8.

Application for Permit for a
Public Display of Pyrotechnics ffi
P. O. Box 488
Lakeside, CA 92040-0488
(619) 9384277
Fax (619) 938-8273
& St.!c tX
i\me-erieE
Authoritv havi ng J u risdiction :

Lauren Ono
Folsom Fire Department
48 Natoma Street
Folstom, CA 95630
22165 Glient:

Folsom Chamber of Commerce
Attn: Libby Siino
200 Wool Street
Folsom, CA 95630
Fireworks & Stage FX America, lnc. on behalf of the Sponsor Listed Above requests a permit to conduct a public display of fireworks in accordance with Federal, State and Local Laws and Ordinances.

Date(s): 71112022 71212022,71312022 Site lnformation:

Time/Length: 9:45PM Folsom Rodeo Arena
See Plot Map
200 WoolStreet
Folsom, CA 95630
Pyrotechn ic Brandon Waits 2936-02
Brandon Cell 91 6-802-4482
Email: [email protected]
Proof of current General Liability lnsurance and Workers Compensation lnsurance is attached, A detailed diagram of the proposed firing site is attached. Office contact: Julie Andrews Description of Display: (619) 938'8277' Fax (619) 938-8273 Folsom Chamber of Commerce on 71112022 in Folsom, CA.

Fireworks fired Electrically, in Racks.

Ground Level Pyrotechnics (0 - 50 Foot typical Altitude):

Low Level Pyrotechnics (51 - 125 foot typical altitude):

Devices - 60;
Bombardments - 26;
Aerial Pyrotechnics (>125 foot typical altitude):

PERMISSION TO CONDUCT A PUBLIC DISPLAY OF PYROTECHNICS AS SPECIFIED HEREIN Operator(s)
and License
Number:
(where required)
IS HEREBY:
(Operator Name) (License No.)
and assistants.

PERMITTED DENIED
Circle Appropriate Signature of Permitting Authority
Fireworks & Stage FX Permit Reference No. 22165
Title
Date
PrintedPage 79
06/14/2022 Item No.8.

Application for Permit for a
Public Display of Pyrotechnics
Sk, P. o. Box488
"iffi*fff."
Lakeside, cA 92040-0488
TJ h-;;=- (619) 938-8277
i\m-fieA Fax (619) e38-8273
Authority having J urisdiction :

Lauren Ono
Folsom Fire Department
48 Natoma Street
Folstom, CA 95630
Glient:

Folsom Chamber of Commerce
Attn: Libby Siino
200 Wool Street
Folsom, CA 95630
olsom Rodeo Arena
Plot Map
00 WoolStreet
olsom, CA 95630
Signature of Permitting Authority
22166
Fireworks & Stage FX America, lnc. on behalf of the Sponsor Listed Above requests a permit to conduct a public display of fireworks in accordance with Federal, State and Local Laws and Ordinances Date(s):

Time/Length:

Operator(s)
and License
Number:
(where required)

IS HEREBY
9:45PM
7t212022 71112022 71312022 Site lnformation:

Pyrotechnic Brandon Waits 2936-02
(Operator Name)
and assistants
(License No.)
Brandon Cell: 91 6-802-4482
Email: bfwaits@qmail. com
Proof of current General Liability lnsurance and Workers Compensation lnsurance is attached' A detailed diagram of the proposed firing site is attached. Office contact: Julie Andrews Description of Display: (619) 938'8277' Fax (619) 938-8273 Folsom Chamber of Commerce on 71212022 in Folsom, CA.

Fireworks fired Electrically, in Racks.

Ground Level Pyrotechnics (0 - 50 Foot typicalAltitude):

Low Level Pyrotechnics (51 - 125 foot typical altitude):

Devices - 60;
Bombardments - 26;
Aerial Pyrotechnics (>125 foot typical altitude):

PERMISSION TO CONDUCT A PUBLIC DISPLAY OF PYROTECHNICS AS SPECIFIED HEREIN

PERMITTED DENIED
Circle ApproPriate
Fireworks & Stage FX Permit Reference No. 22166
Title
Date
PrintedPage 80
06/14/2022 Item No.8.

Application for Permit for a
Public Display of Pyrotechnics ffi
P. O. Box 488
Lakeside, CA 92040-0488
(619) 938€277
Fax (619) 938-8273
& St.!r FX
?\me-erieE
Authoritv having Jurisdiction :

Lauren Ono
Folsom Fire Department
48 Natoma Street
Folstom, CA 95630
22167 Client:

Folsom Chamber of Commerce
Attn: Libby Siino
200 Wool Street
Folsom, CA 95630
Fireworks & Stage FX America, lnc. on behalf of the Sponsor Listed Above requests a permit to conduct a public display of fireworks in accordance with Federal, State and Local Laws and Ordinances Date(s): 7t3t2022 71112022 71212022 Site lnformation:

Time/Length : 9:45PM olsom Rodeo Arena
ee Plot Map
WoolStreet
olsom, CA 95630
Pyrotech nic Brandon Waits 2936-02
Brand on Cel| 91 6-802'4482
Email : bfwaits@qmail. com
Proof of current General Liability lnsurance and Workers Compensation lnsurance is attached.

A detailed diagram of the proposed firing site is attached. Office contact: Julie Andrews Description of Display: (619) 938'8277 ' Fax (619) 938'8273 Folsom Chamber of Commerce on 71312022 in Folsom, CA.

Fireworks fired Electrically, in Racks.

Ground Level Pyrotechnics (0 - 50 Foot typical Altitude):

Low Level Pyrotechnics (51 - 125 foot typical altitude):

Devices'60;
Bombardments - 26;
Aerial Pyrotechnics (>125 foot typical altitude):

PERMISSION TO CONDUCT A PUBLIC DISPLAY OF PYROTECHNICS AS SPECIFIED HEREIN Operator(s)
and License
Number:
(where required)
IS HEREBY:
(Operator Name) (License No.)
and assistants.

PERMITTED DENIED
Circle Appropriate Signature of Permitting Authority
Fireworks & Stage FX Permit Reference No. 22167
Title
Date
PrintedPage 81
06/14/2022 Item No.8.

WIND NORTH

Page 82 ends

06/14/2022 Item No.8.

CERTIFICATE OF LIABILITY INSURANCE

DATE (MM'DD/YYYY)
5t1612022
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFE RS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS

CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSU]NG INSURER(S}, AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. tfVlponTnNt: tf ttre certiticate holder is an ADDITIONAL INSURED, the policy(ies) must be endors6d. lf SUBROGATION lS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).

PRODUCER
The Partners Group Ltd
11225 SE 6th St., Suite 110
Bellevue WA 98004
INSURER{S} AFFORDING COVERAGE NAIC #
tNsuRER A , Everest lndemnitv lnsurance co 10851

INSURED
Fireworks and Stage FX America, lnc.

Fireworks and Stage FX America, LLC
PO Box 488
Lakeside CA 92040-0488
't4567 |NSTJRER B: Everest Denali lnsurance company 16044 rNsuRER c: AXIS Surplus Lines lnsurance Company 26620
tNsuRER D: Arch specialty lnsurance company 21199
INSIIRFR F :

INSTIRER F :

CERTIF MBER:133091620 REVISION NUMBER:

TH IS IS TO CERTIFY THAT THE POLI CIES OF INSURANCE LISTED BELOW HAVE BEEN ISSU ED TO TH E INSURED NAMED ABOVE FOR THE POLI CY PERI OD INDICATED, NOTW THSTANDING ANY REQUIREMENT TERM OR co NDITION OF ANY CONTRACT OR OTH ER DOCUMENT WTH RESPECT TO WHICH TH ts

CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.

HEREIN s SU BJECT TO ALL THE TERMS,

INSRITF WPE OF INSURANCE POLICY NUMBER
PqLIUY EFF POLICY EXPIMM'DD/YYYYI LIMITS

GENERAL LIABILITY

X COMMERCIAL GENERAL LIABILITY

CLAIIVS-MADE OCCUR
GEN'L AGGREGATE LIMIT PER:

LOCX
X
Y s18M102461221 2t11t2022 2t11D023 EACH OCCURRENCE $ 1.000.000 $ 500.000
MED EXP (Anv one oerson) $ Excluded
s 1 000 000PERSONAL & ADV INJURY
GENERAL AGGREGATE $ 2.000.000
PRODUCTS - COMP/OP AGG $ 2.000.000
$

B AUTOMOBILE LIABILITY

X ANY AUTO

ALL OVVNED
AUTOS

SCHEDULED
AUTOS
NON.OWNED

AUTOSX HIRED AUTOS X
X X
st8cAo0278221 2111t2022 2t11t2023 $ ,t 000 000
BODILY INJURY (Per pereon) $
BODILY INJURY (Per a@ident) $
$
$
c UMBRELLA LIAB

EXCESS LIAB

X OCCUR

CLAIMS-MADE
P001 000739376001 2111t2022 211'U2023 EACH OCCURRENCE $ 4,000,000 X AGGREGATE $ 4,000,000
DFD RETENTION $ $

WORKERS COMPENSATION

AND EMPLOYERS' LIABILITY

ANY PROPRIETOFYPARTNER/EXECUTIVE
OFFICER/MEIUBER EXCLUDED?
(Mandatory in NHI
lf yes, describe under
NFSCRIPTION OF OPFRATIONS beIOw
fi N/A

I WCSTATU- I
I Topv I tiflTq I
O TH.ED
E.L. EACH ACCIDENT $
E.L- DISEASE. EA EMPLOYEE $
E.L, DISEASE - POLICY LIMIT s
u
B
Ex6ss Liability - Occurence
Hked Auto Phys Dmg.
- $86,000
uxP10481 1 300
st8cA00278221
2111t2022
2t11t2022
2t11t2023
2t1112023
Each Occ/Aggregate $5,000,000
DESCRtpTtONOFOpERAT|ONS/LOCAT|ONStVEH|CLES (AftachACORDl0l,Additlonal Remarksschedule,if morcspaceisEqulred) ini fof f o"ring are Additionalinsureo on Generai Lianitity as their interest may appear as respects to operations performed by or on behalf of the Named lnsured, as required by written contract:

Citv of Folsom. Folsom Cnafrbei oi Commerce, Dan Russel Arena, Folsom Fire Department; its officers, agents, employees, and servanls when acting in their Jmtiii tii,*iti ii'iuiir. in'J orty ticensed opeiator requiied by taw to supervise anb discharge the public show, acting elither as. an employee of the insured or it in ino5perifent coniractorint tne stiie ,iiciiifornii, its of{cers, agerits, employees, and-servarits are included as additional insureds per wrifen contract.

Show Date: 7 l'1, 7 12, 7 1312022
Show Location: Folsom Rodeo Arena

CERTIFICATE HOLDER CANCELLATION
@ 1988-2010 ACORD CORPORATION. All rights reserved.

Folsom Chamber of Commerce
200 Wool Street
Folsom CA 95630

SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOllCE WILL BE DELIVERED IN ACCORDANCE I'UITH THE POLICY PROVISIONS.

AUTHORIZED REPRESENTATIVE
I-.i.4
I
ACORD 25 {2010/05) The AGORD name and logo are registered marks of ACORD

Page 83 ends

06/14/2022 Item No.8.

DATE (MM/DD/YYYY}
0211t2022

THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATI

CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY
ON ONLYAND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS

AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED

REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER' DDITIONAL INSURED provisions or be endorsed.
lf suBRoGATloN ls wAlvED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).

PROOUCER
The Partners Group Ltd
11 225 SE 6th St.

Suite 110
Bellevue wA 98004
Janet Nau
llJPlll ,,.,. (877) 45s-5640 (425) 455-6727
[email protected]
INSURER(SI AFFORDING COVERAGE NAIC #
tNsuRERA: Everest lndemnity lnsurance Co 1 0851

INSURED
Fireworks and Stage FX America, lnc.,
Fireworks and Stage FX America, LLC
PO Box 488
Lakeside cA 92040-0488
tNsuRER B: Everest Denali lnsurance Company '16044
tNsuRERc r AXIS Surplus Lines lnsurance Company 26620
tNsuRER D: Everest lndemnity lnsurance Co 1 0851
INSURER E :

INSIIPFR F.

COVERAGES

CERTIFICATE OF LIABILITY INSU RANCE
CERTIFICATENUMBER: 22-23 NUMBER:

O 1988-2015 ACORD CORPORATION. All rights reserved.

INDICATED. NOTWTHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WTH RESPECT TO WHICH THIS

CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES OESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHO\^/N MAY HAVE BEEN REDUCED BY PAID CLAIMS,

THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD LIMITSPOLICY EFF(MM/DD/YYYYItNan POLICY NUMBERITR
INSK

TYPE OF INSURANCE
EACH OCCI.JRRENCE $ 1,000,000
c 100,000DAMAGE IO RIN I ED
PRFMISFS lF, o.curencel
s ExcludedMED EXP (Anv one Derson)
$ 1,000,000PERSONAL &ADV INJURY
GFNFRAL AGGREGATE $ 2,000,000
PRODUCTS - COMP/OP AGG $ 2,000,000
0211112023
$
0211112022st8ML02461 221A

COMMERCIAL GENERAL LIABILITY
.LA'M.-MADE f,l o""r*
OTHER:
!F3; l-1.o"

GEN'LAGGREGATE
POLICY
$ 1,000,000
$BODILY INJURY (Per person)
$BODILY INJURY (Per accident)
$
o
0211112022 0211112023st8cA00278221B

ANYAUTO
OWNED

AUTOS ONLY
HIRED

AUTOS ONLY

SCHEDULEO
AUTOS
NON.O\ANED

AUTOS ONLY

AUTOMOBILE LIABILITY
EACH OCCURRENCE $ 4,000,000xx c 4,000,000AGGREGATE

UMBRELLA LIAB

EXCESS LIAB
OCCUR

CLAIMS-MADE
s
02/1112022 0211t2023P-001 -000793760-01c
NFD RETENTION $
PER OIH.Ftr
F I FACHACCIDENT $

EL DISEASE-EAEMPLOYEE
$E.L. DISEASE. POLICY LIMIT
N/A

WORKERS COMPENSATION

AND EMPLOYERS' LIABILITY

ANY PROPRI ETOR/PARTNER/EXECUTIVE
OFFICER/MEMBER EXCLUDED?
(Mandatory in NH)
lf yes, describe under
DEscRlPTloN oF OPERATIoNS below
o2t'11t2023
Each Occurrence
Aggregate
5,000,000
5,000,0000211t2022TBDD
Excess Liability - Per Occurrence
DESCRtpTtON OF OPERATTONS / LOCATTONS / VEHTCLES (ACORO lOl, Additional Remarks schedule, may be attached if moG space is required) Evidence of lnsurance
The duly licensed pyrotechnic operator required by law to supervise and discharge the public display, The State of California, its officers, agents, employees and servants when acting in their official capacity as such.

Office of the State Fire Marshal
Po Box944246
Sacramento cA 94244-2460

SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE

THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN

ACCORDANCE WITH THE POLICY PROVISIONS,

AUTHORIZED REPRESENTATIVE
ACORD 25 (2016/03) The ACORD name and logo are registered marks of ACORD

Page 84 ends

06/14/2022 Item No.8.
--ACORD"

FIRE&ST-OI

CERTIFICATE OF LIABILITY INSURANCE

DATE (MM/DD/YYYY)

THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLYAN

CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTE

BELOW THIS GERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A D CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS

ND OR ALTER THE COVERAGE AFFORDED BYTHEPOLICIES

CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED

REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER' IMPORTANT: lf the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed. lf SUBROGATION lS WAIVED, subject to the terms and conditions of the policy, certain policies such endorsement(sl.
may require an endorsement' A statement on
this certificate does not confer rights to the certilicate holder in lieu of

PRODUCER
Whiteboard Risk & Insurance Solutions, LLC
8787 Complex Drive Ste 202
San Diego, CA92123
fi?$I+"t John Tillery
223-1170 223-1170
rNsuRERA,state compensation lns Fund 35076

INSURED
Fireworks & Stage FX America, LLC
DBA Fireworks America
P.O. Box 488
Lakeside, CA S2040
INSURER B :

INSI IRFR C .

INSI IRFR D :

INSIIRER E :

INSURER F :

THAT
DICATE
FORABOVE POLITHE PERICY ODBEENHAVE DISSUE THETO NSUR NAMEDEDOF RANCEINSU BELOWLISTEDESISTHIS CERTIFYTO POLtCtTHE THISWHICHDOCUMENTOTHER TOWTH RESPECTOR OFCONDITION CONTRACTANY ORRANY REMEQUI ENT TERMSTANNOTWTH DINGIN D ALLTO ETHTHBY E DESCRIBEDPOLICIES REINHE SUBJECT TERMS,ISTH AFFORDEDINSURANCEFICATEERTI BEMAY SSUED MAYOR PERTAIN,c LAIMS.HAMAY BEENVE BY PAIDREDUCEDPOSUCH Ltc LIES. SMITS O\iryNHANDEXCLUSIONS OFCONDITIONS

LIMITSPOLICY NUMBERTYPE OF INSURANCE
&

COMMERCIAL GENERAL LIABILITY

L AGGREGATE LIMIT APPLIES
'o.'." l-1588; E

CLAIIVS-MADE OCCUR
PER:

LOC
NGLE Lll\,llT

AUTOMOBILE LIABILIW

ANY AUTO
OWNED

AUTOS ONLY
HIRED

AUTOS ONLY

SCHEDULED
AUTOS

NON-OWNED

AUTOS ONLY

UMBRELLA LIAB

EXCESS LIAB
OCCUR

CLAIMS-MADE
DED RETENTION $
X
1,000,000
1 6t112021 6t1t2022
N/A

WORKERS COMPENSATION
AND EMPLOYERS'LIABIUry

ANY PROPRIETOR/PARTN EFYEXECUTIVE
OFFICER/MEI/lBER EXCLUDED?(Mandatory in NH)
describe underlf
16t1t2022
oFopERAT|ONS/LOCATTONS/VEHtCLES (ACORDl0l,AdditionalRemarkssGhedule,maybeaftachedifmorespaceisrequired) of lnsurance,
Proof of lnsurance

SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE

THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS.

AUTHORIZED REPRESENTATIVE
z .,7 *./ ),2"-- 7naZ.-
@ 1988-2015 ACORD CORPORATION. All rights reserved'ACORD 25 (2016/03) The AGORD name and logo are registered marks of ACORD

Page 85 ends

06/14/2022 Item No.8.
--,ACORD"9-
FIRE&ST.O1

CERTIFICATE OF LIABILITY INSURANCE
DATE (MM/DD/YYYY}
5t31t2022

THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLYANDCONFERSNORIGHTSUPONTHECERTIFICATEHOLOER'THIS

CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE GOVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. tMpoRTANT: lf the certificate hotder is an ADDITIONAL INSURED, the poticy(ies) must have ADDITIONAL INSURED provisions or be endorsed. and itionscond theof certaints theto terms policy,BROGATION WAIVED,lf SU subject lieutn of uchto certificatethe holderhtscertificatethis notdoes confer may require an endorcement. A statement on
hn Tille
223-1170223-1170Risk & lnsurance Solutions, LLG
8787 Complex Drive Ste 202
San Diego, CA92123

PRODUCER
Fireworks & Stage FX America, LLG
DBA Fireworks America
P.O. Box 488
Lakeside, CA 92040

INSURED
PERIODNAMEDD FORABOVE POLICYTH EHAVEBELOW NBEE TOISSUED INSURETHELISTEDOF INSURANCErsTH TOrs THACERTIFY THET CIESPOLI WHTO THrcHOR DOCUOTHER ENTM RESPECTWTHORTERM OFCONDITION CONTRACTANYING REQUIREMENTANYNOTWTHSTANDTED-INDICA EDB NHEREI S ECTSUBJ ALLTO TERMS,THEBYAFFORDED POLITHE DESCRIctEsMA EE INSURANCTHFICERTI MAYCATE ISSUEDBE OR PERTAIN, BY DPAI MS.CLAIHAVEMAY REDUCEDBEENOF POLTCISUCH LIES. TSMI SHOWNANEXCLUSIONS CONDITIONSD

LIMITSPOLICY NUMBERTYPE OF INSURANCE

COMMERCIAL GENERAL LIABILITY
LIMIT PER:

LOCT
PRO.

JECT

CLAIMS-MADE OCCUR

AUTOMOBILE LIABILITY

ANY AUTO
O\^/NED

AUTOS ONLY
HIRED

AUTOS ONLY

SCHEDULED
AUTOS

NON-OWNED

AUTOS ONLY
OCCUR

CLAIMS-MADE

UMBRELLA LIAB

EXCESS LIAB

DED RETENTION
X
1 1
6t1t2022 6t1t2023
N/A

WORKERS COMPENSATION

AND EMPLOYERS' LIABILITY

ANY PROPRI ETOR/PARTNER/EXECUTIVE
OFFICER/MEMBER EXCLUDED?
(Mandatory in NH)
describe und€rtf
t2022
DESCR|pTtON OF OPERATTONS / LOCATTONS /VEHtCLES (ACORD 101, Additional Remarks schedule, may be attached if more space is required) of lnsurance.

Proof of lnsurance.

SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE

THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS.

AUTHORIZED REPRESENTATIVE
.y-/\/' ,/1- *// ,/
//4__ ( -t-Lv/ -
@ 1988-2015 ACORD CORPORATION. All rights reserved.ACORD 2s (2016/03) The ACORD name and logo are registered marks of ACORD

Page 86 ends

06/14/2022 Item No.8.

STATE
FUND

COMPENSATION
INSURA\CE

ENDORSEMENT AGREEMENT
9IAIVER OF SUBROGATI

BLANKET
EFFECTM JUNE l, 2022 AT
AND EXPIRING JUNE I, 12.0r A.M.
2023 AT 12.0L A.M.

BROKER COPY
REP 04
9080254-22

RENETIAL
SP
3-51-r2-0 3
PAGE I. OF I

HOME OFFICE

SAN FBANCISCO

ALLEFFECTIVE DATESARE
AT 12:01 AM PACIFIC

STANOARD TIME OR THE

TIME INDICATED AT

PACIFIC STANDARD TIME
FIRE9IORKS AI{ERICA
PO BOX 488
LAKESIDE, CA 92040
WE HAVE THE RIGHT TO RECOVER OUR PAY}IENTS FROM ANYONE
LIABLE FOR AN INJURY COVERED BY THIS POLICY. WE 9IILL

NOT ENFORCE OUR RIGHT AGAINST THE PERSON OR
ORGANIZATION NAMED IN THE SCHEDULE.

THIS AGREEI{ENT APPLIES ONLY TO THE EXTENT THAT YOU
PERFORH }JORK UNDER A WRITTEN CONTRACT THAT REQUIRES YOU TO OBTAIN THIS AGREEMENT FRO}I US.

THE ADDITIONAL PREI{IUI.T FOR THIS ENDORSEMENT SHALL BE

2.007. OF THE TOTAL POLICY PREMIUil.

SCHEDULE

PERSON OR ORGANIZATION JOB DESCRIPTION
2572

ANY PERSON OR ORGANIZATION
FOR TJHO}{ THE NAMED INSURED

HAS AGREED BY WRITTEN

CONTRACT TO FURNISH THIS
WAIVER

BLANKET WAIVER OF

SUBROGATION

NOTHING IN THIS ENDORSEMENT CONTAINED SHALL BE HELD TO VARY, ALTER, WAIVE oR EXTEND ANY OF THE TERMS, CONDITIONS, AGBEEMENTS, OR LIMITATIONS OF THIS POLICY OTHER THAN AS STATED. NOTHING ELSEWHERE !N THIS POLICY SHALL BE

HELD TO VARY, ALTER, WAIVE OR LIMIT THE TEBMS, CONDITIONS, AGREEMENTS OR

LIMITATIONS OF THIS ENDORSEMENT,
COUNTERSIGNED AND ISSUED AT SAN FRANCISCO: MAY
,,/
,6*e/4
AUTHoRTzED RepReserurMve
/o-,-- J/;-*
sctF FoFM 10217 (REV.7-2014)
26, 2022

PRESIDENT AND CEO
OLD DP 2'I7Page 87
06/14/2022 Item No.8.

FIREWORKS LICENSE
Public Display - General
LICENSE NUMBER: GPD-0528

F'RE FOR
Licensee : FIREWORKS & STAGE FX AMERICA' LLC
12485CA 67 lssue Date : 0511212022
LAKESIDE, CA,92040-0488 Expiration Date : AOB012023
619-938-9277
The public Display - General Fireworks License is issued to the above Licensee by the California office of the State Fire Marshal and maybe revoked or suspended for errors or for providing incorrect information provided by the applicant or
"o*prny
representatives. This license does not serve as or provide any warranties or glaranties of continued licensure and is subject to investigation.

Display Address

VARIOUS
Display lnformation:

CitY

VARIOUS
zip
00000
County
USA
#-unt (,,v
/ir/.t :''-\",
'I
lssued BY Vikkie Franklin
Fire Engineering License Manager
Fire Engineering and lnvestigations Division
Reviewed and APProved BY Caleb Phi llips
Program Coordinator
Fire Engineering and lnvestigations Division

OFFICE OF THE STATE FIRE MARSHAL
please visit calfire.govmotus.org for more information on licensing and permitting with CAL FIRE

Page 1 of 2 ends
Page 88 ends

06/14/2022 Item No.8.

FIREWORKS LICENSE
Wholesaler
LICENSE NUMBER: W-1132

FORF'RE
Licensee : FTREWORKS & STAGE FX AMERTCA
12485 CA 67
LAKESIDE, CA,92040
na
lssue Date :0510212O22
Expiration Date : 0O13012023
The Wholesaler Fireworks License is issued to the above Licensee by the California Office of the State Fire Marshal and maybe revoked or suspended for errors or for providing incorrect information provided by the applicant or company representatives. This license does not serve as or provide any warranties or guarantees of continued licensure and is subject to investigation.

M.w,tl,n,
!t_
.i'
lssued By Vikkie Franklin
Fire Engineering License Manager
Fire Engineering and lnvestigations Division
Reviewed and Approved By Caleb Phillips
Program Coordinator
Fire Engineering and lnvestigations Division

OFFICE OF THE STATE FIRE MARSHAL
please visit calfire.govmotus.org for more information on licensing and permitting with CAL FIRE

Page 1 of 1 ends
Page 89 ends

06/14/2022 Item No.8.

FIREWORKS LICENSE
lmporter/Exporter
LICENSE NUMBER: llE-1 129
FOR
I ntr5
F'RE
Licensee : FIREWORKS & STAGE FX AMERICA, LLC
12485 CA 67
LAKESIDE, CA, 92040-O4BB
61 9-938-8277
lssue Date
Expiration Date
05t0212022
0613012023
The lmporter/Exporter Fireworks License is issued to the above Licensee by the California Office of the State Fire Marshal and maybe revoked or suspended for errors or for providing incorrect information provided by the applicant or company representatives. This license does not serve as or provide any warranties or guarantees of continued licensure and is subject lo investigation. {/'tan*4,n,
,tL
{
lssued By Vikkie Franklin
Fire Engineering License Manager
Fire Engineering and lnvestigations Division
Reviewed and Approved By Caleb Phillips
Program Coordinator
Fire Engineering and lnvestigations Division

OFFICE OF THE STATE FIRE MARSHAL
Please visit calfire.govmotus.org for more information on licensing and permitting with CAL FIRE

Page 1 of 1 ends
Page 90 ends

06/14/2022 Item No.8.
:,i +i,:-liii\:l
Folsom City Council
Staff Re rt

RECOMMENDATION / COUNCIL ACTION
Staff recommends that the City Council move to adopt:

Resolution No. 10866 - A Resolution Authorizing the City Manager to Execute a Subdivision Improvement Agreement and Accept Offers of Dedication for the Toll Brothers at Folsom Ranch Phase lE Subdivision, and Approval of the Final Map for the Toll Brothers at Folsom Ranch Phase lE Subdivision

BACKGROUND / ISSUE
The Vesting Tentative Subdivision Map (VTSM) for the Toll Brothers at Folsom Ranch Phase lE Subdivision was approved by the City Council on March 10,2020.

The action for consideration by the City Council is the approval of the Final Map and Subdivision Improvement Agreement for the Toll Brothers at Folsom Ranch Phase lE Subdivision. The Final Map for the Toll Brothers at Folsom Ranch Phase lE Subdivision will create a total of 116 single-family high density (SFHD) residential lots and 41 multi-family low density (MLD) residential lots. With the approval of the Final Map, the subdivision process for this phase will be complete.
1 MEETING DATE: 6n412022
AGENDA SECTION: Consent Calendar
SUBJECT: Resolution No. 10866 - A Resolution Authorizing the City Manager to Execute a Subdivision Improvement Agreement and Accept Offers of Dedication for the Toll Brothers at Folsom Ranch Phase lE Subdivision, and Approval of the Final Map for the Toll Brothers at Folsom Ranch Phase lE Subdivision
FROM: Community Development Department

Page 91 ends

06/14/2022 Item No.9.

MANGINI PARKWAY
)
-':.--}..,
-t-.!. | -\-
FHrI]
&Fa
F]
F]
r!
ca
Fa
14 PHASE lE
tklntl l[t\d[U 1'.
rqarl Br. nttE str. !1.rtr4tr.alt
xrilEl At t{xx4tl!.rqtrn41t':Itsidr4 jr
t,r$l
1,1 r.;
nra{ lLMl
l.
+l--tr...H
The Toll Brothers at Folsom Ranch Phase 1E Subdivision is located on the north side of White Rock Road, west of East Bidwell Street, south of Mangini Parkway and east of the future Toll Brothers at Folsom Ranch Phase 2 subdivision in the Folsom Plan Area (FPA) (see above).

POLICY / RULE
The Subdivision Map Act of the State of California and the City's Subdivision Ordinance require that the City Council approve Final Maps and Subdivision Improvement Agreements. 2

Page 92 ends

06/14/2022 Item No.9.

ANALYSIS
The Final Map and conditions of approval for the Toll Brothers at Folsom Ranch Phase lE Subdivision have been reviewed by the Community Development Department and other City departments. The Final Map has been found to be in substantial compliance with the approved Vesting Tentative Subdivision Map, and all conditions pertaining to the map have been satisfied.

Attached is a table which includes the conditions of approval for the Toll Brothers at Folsom Ranch Phase lE Vesting Tentative Subdivision Map. The tables include information concerning when the condition is required to be satisfied (e.g. at Final Map, building permit, etc.), which City department is responsible to verifu that it has been satisfied, and comments or an explanation on how the condition was satisfied. This subdivision is consistent with the Folsom Plan Area Specific Plan (FPASP) in regards to zoning and unit count.

ENVIRO REVIEW
An Addendum to the Folsom Plan Area Environmental Impact Report was previously approved for the Toll Brothers at Folsom Ranch Phase lD Subdivision (PN l9-091) on March 10,2020 in accordance with the California Environmental Quality Act (CEQA). The project is consistent with this Addendum to the Folsom Plan Area Specific Plan EIR/EIS, and all mitigation measures have been applied as conditions of approval for this project. In addition, none of the conditions described in Section21166 of the Public Resources Code or Section 15162 of the CEQA Guidelines calling for the preparation of a subsequent EIR have occurred. Therefore, no additional environmental review is required under CEQA.

L Resolution No. 10866 - A Resolution Authorizing the City Manager to Execute a Subdivision Improvement Agreement and Accept Offers of Dedication for the Toll Brothers at Folsom Ranch Phase lE Subdivision, and Approval of the Final Map for the Toll Brothers at Folsom Ranch Phase lE Subdivision

2. Toll Brothers at Folsom Ranch Phase lE Subdivision Improvement Agreement

3. Toll Brothers at Folsom Ranch Phase lE Subdivision Final Map

4. Toll Brothers at Folsom Ranch Phase lE Vesting Tentative Subdivision Map

5. Table of Conditions of Approval for the Toll Brothers at Folsom Ranch Phase lE Vesting Tentative Subdivision Map
Submitted
a
J

Page 93 ends

06/14/2022 Item No.9.

PAM JOHNS, Community Development Director
4

Page 94 ends

06/14/2022 Item No.9.

ATTACHMENT I
Resolution No. 10866 - A Resolution Authorizingthe
City Manager to Execute a Subdivision Improvement
Agreement and Accept Offers of Dedication for the
To11 Brothers at Folsom Ranch Phase lE Subdivision,
and Approval of the Final Map for the Toll Brothers at
Folsom Ranch Phase lE Subdivision

Page 95 ends

06/14/2022 Item No.9.

RESOLUTION NO. 10866

A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE

A SUBDIVISION IMPROVEMENT AGREEMENT AND

ACCEPT OFFERS OF DEDICATION FOR THE
TOLL BROTHERS AT FOLSOM RANCH PHASE lE SUBDIVISIONO AND

APPROVAL OF'THE FINAL MAP F'OR THE
TOLL BROTHERS AT F'OLSOM RANCH PHASE 1E SUBDIVISION
WHEREAS, the Final Map for the Toll Brothers at Folsom Ranch Phase lE subdivision has been reviewed and approved by the City Engineer as complying with the approved or conditionally approved Vesting Tentative Subdivision Map for the subdivision; and, WHEREAS, the City Council has reviewed the Final Map for the Toll Brothers at Folsom Ranch Phase lE subdivision; and,
WHEREAS, the City Council agrees to accept, subject to improvement, any and all offers of dedication as shown on the Final Map for the Toll Brothers at Folsom Ranch Phase 1E subdivision.

NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Folsom that the Final Map for the Toll Brothers at Folsom Ranch Phase lE subdivision is hereby approved; and
BE IT F'URTHER RESOLVED that the City Manager is hereby authorized to execute the Subdivision Improvement Agreement with Toll West, Inc. which will do business in California as Toll Brothers West, Inc. in a form acceptable to the City Attorney and accept the offers of dedication for the Toll Brothers at Folsom Ranch Phase lE subdivision.

PASSED AI\D ADOPTED this 14th day of June 2022, by the following roll-call vote AYES: Council Member(s)
Council Member(s)
Council Member(s)
Council Member(s)
NOES:

Keni M. Howell, MAYOR
ATTEST:

Christa Freemantle, CITY CLERK
Resolution No. 10866
Page I of I
ABSENT:

ABSTAIN:

Page 96 ends

06/14/2022 Item No.9.

ATTACHMENT 2
Toll Brothers at Folsom Ranch Phase lE Subdivision
Improvement Agreement

Page 97 ends

06/14/2022 Item No.9.

No Fee Document Pursuant to Government
Code Section 6103.

RECORDING REOUESTED BY:

City of Folsom
WHEN RECORDED MAIL TO:

NAME

MAILING ADDRESS

CITY, STATE, ZIP CODE
City of Folsom
Cify Clerk
50 Natoma Street
Folsom, CA 95630

SPACE ABOVE THIS LINE RESERVED FOR RECORDER'S USE

CITY OF FOLSOM

SUBDIVISION IMPROVEMENT AGREEMENT
This Agreement is made and entered into this day of 2022,by and between the City of Folsom, hereinafter referred to as "City", and Toll Westo Inc. which will do business in California as Toll Brothers West, Inc., a Delaware Corporation hereinafter referred to as "Subdivider".

RECITALS
A. Subdivider has presented to the City a certain Final Map of a proposed subdivision of land located within the corporate limits of the City that has been prepared in accordance with the Subdivision Map Act of the State of California, the subdivision ordinances of the City, and the Tentative Subdivision Map, if any, of the subdivision previously approved by the City Council of the City.

The proposed subdivision of land is commonly known and described as Toll Brothers at Folsom Ranch Phase lE Subdivision and is herein referred to as the "subdivision".

Subdivider has requested apptoval of the Final Map prior to the construction and completion of the public improvements (as shown on the approved improvement plans and listed in Exhibit A), including, but not limited to streets, highways, public ways, sidewalks, curbs, gutters, bikeways, storm drainage facilities, sanitary sewer facilities, domestic water facilities, public utility facilities, landscaping, public lighting facilities, park or recreational improvements and appurtenances thereto, in or required by the Subdivision Map Act, the subdivision ordinances of the City, the Tentative Subdivision Map and development agreement, if any, approved by the City. The foregoing improvements, more specifically listed on Exhibit A attached hereto, are hereinafter referred to as "the required improvements", B
C
1

Page 98 ends

06/14/2022 Item No.9.

D City Council has required as a condition precedent to the approval of the Final Map, the Subdivider first enters into and executes this subdivision improvement agreement with the City NOW, THEREFORE, the parties agree as follows:

1. 5
Perl'tr ol'Work. Subdivider agrees to fumish, construct, and install at his own Improvement security in the sum of FIVE MILLION ONE HUNDRED FORTY-SIX THOUSAND FORTY-THREE AND OO/1OO DOLLARS
($5,146,043.00), which sum is equal to one hundred percent of the total estimated cost of constructing the required improvements and the cost of any other obligation to be performed by Subdivider under this Agreement, conditioned upon the faithful performance of this Agreement; and Separate improvement security in the sum of FIVE MILLION ONE HUNDRED FORTY-SIX THOUSAND FORTY-THREE AND OO/1OO
DOLLARS ($5,146,043.00), which sum is equal to one hundred percent of the 2 2
J
expense the required improvements as shown on the approved plans and specifications of the subdivision, a copy of which is on file in the Community Development Department, and is incorporated herein by reference, along with any changes or modifications as may be required by the City Engineer due to errors, omissions, changes in conditions, or changes in facilities as required by the City Engineer. The approved plans and specifications of the required improvements may be modified by the Subdivider as the development progresses, provided that any modification is approved in writing by the City Engineer. The total estimated cost of the required improvements, as shown on Exhibit A, is FIVE MILLION ONE HUNDRED FORTY-SIX THOUSAND FORTY-THREE AND 00/100 DOLLARS ($5,146,043.00).

Work: Satisthction of City Enrrineer. All of the work on the required improvements is to be done at the places, of the materials, and in the manner and at the grades, all as shown upon the approved plans and specifications and as required by the City's Improvement Standards and Standard Construction Specifications and any applicable City ordinances or state and federal laws, and to the satisfaction of the City Engineer.

Work: "l'inre lor (loru]lrgrlger:rerrt and Performancc. Work on the required improvements shall be completed by the Subdivider on or before twelve (12) months from the date of this Agreement. At least fifteen (i 5) calendar days prior to the commencement of such work, the Subdivider shall notifu the City Engineer in writing of the date fixed by Subdivider for commencement of the work.

4. Time of Essence: Bxtension.
a. Time is of the essence of this Agreement. The date for completion of the work of construction may not be extended, except as provided in Section 16.36.110 of the Folsom Municipal Code.

Inrprovement Security. Concurrently with the execution of this Agreement, the Subdivider shall furnish the City:
a.
b.

Page 99 ends

06/14/2022 Item No.9.
c
d
estimated cost of constructing the required improvements, securing payment to the contractor, subcontractor and to persons furnishing labor, materials, or equipment to them for the construction of the required improvements.

The Subdivider shall deposit with the City THREE THOUSAND AND NO/100 DOLLARS ($3,000.00) for the Final Map. The deposit may be used at the discretion of the City to comect deficiencies and conditions caused by the Subdivider, contractor, or subcontractors that may arise during or after the constmction of the subdivision.

The estimated total cost of required improvements includes a ten percent (i0%) construction cost contingency, the cost of the installation of survey monuments in the Subdivision to guarantee and secure the placement of such monuments as provided by Section 66496 of the Government Code of the State of California, and an estimated utility cost in addition to ensure installation of public utilities.

In lieu of providing the estimate of total utility costs, the Subdivider may submit, in a form acceptable to the City Engineer, certification from the utility companies that adequate security has been deposited to ensure installation.

Plan Checkine and Inspectien liegs. The Subdivider shall pay to the City fees for the checking, filing, and processing of improvement plans and specifications, and for inspecting the construction of the required improvements in the amounts and at the times established by the City.

Indemnification and Hold Harmless. The Subdivider shall indemnify, protect, defend, save and hold the City harmless from any and all claims or causes of action for death or injury to persons, or damage to property resulting from intentional or negligent acts, effors, or omissions of Subdivider or Subdivider's officerso employees, volunteers, and agents during performance of this Agreement, or in connection with Subdivider's work, or from any violation of any federal, state, or municipal law or ordinance, to the extent caused, in whole or in part, by the willful misconduct, negligent acts, or omissions of Subdivider or its ernployees, subcontractors, or agents, or by the quality or character of Subdivider's work. lt is understood that the duty of Subdivider to indemnify and hold harmless includes the duty to defend as set forth in Section 2778 of the California Civil Code. Acceptance by City of insurance certificates and endorsements required under this Agreement does not relieve Subdivider fiom liability under this indemnification and hold harmless clause. This indemnification and hold harmless clause shall apply to any damages or claims fbr damages whether or not such insurance policies shall have been determined to apply, and shall further survive the expiration or termination of this Agreement. By execution of this Agreement, Subdivider acknowledges and agrees to the provisions of this Section and that it is a material element of consideration.

Subdivider shall, at his own cost and expense, defend any and all actions, suits, or legal proceedings that may be brought or instituted against the City, its officers and employees, on any such claim or demand, and pay or satisff any judgement that may be rendered against the City in any such actions, suits or legal proceedings, or result thereof.

6. 7
J

Page 100 ends

06/14/2022 Item No.9.
8 Insurance. Subdivider and any contractors hired by Subdividerto perform any ofthe Required Improvements shall, at their expense, rnaintain in effect for the duration of this Agreement or until the required improvements are accepted by the City, whichever first occurs, not less than the following coverage and limits of insurance, which shall be maintained with insurers and under forms of policy satisfactory to the City. The maintenance by Subdivider and it contractors of the following coverage and limits of insurance is a material element of this Agreement. The failure of Subdivider or any of its contractors to maintain or renew coverage or to provide evidence of renewal may be treated by the City as a material breach of this Agreement. a. Minimum Limits of Insurance, Subdivider shall maintain limits not less than Comprehensive General Liability: $1,000,000 combined single limit per occunence fbr bodily injury, personal injury and property damagc.

Automobile Liability: $1,000,000 combined single limit per accident for bodily injury, personal injury and property damage.

Worker's Compensation and Employers Liability: Worker's Compensation limits as required by the Labor Code of the State of California and Employers Liability limits of $1,000,000 per accident.

2. a
J
b. Deductibles and S-9lf--Insured Retentionq. Any deductibles or self-insured retentions shall be declared to and approved by the City. At the option of the City, either: the insurer shall reduce or eliminate such deductibles or self-insured retentions as respects to a bond guaranteeing payment of losses and related investigations, claim administration and defense expenses.

Other Insurance Provisions. The policies are to contain, or be endorsed to contain, the following provisions:

1. General Liability and Automobile Liability Coverages A The City, its officers, officials, employees and volunteers are to be covered as insureds as respects: liability arising out of activities performed by or on behalf of the Subdivider; products and completed operations of the Subdivider; premises owned, leased or used by the Subdivider; or automobiles owned, leased, hired or borrowed by the Subdivider. The coverage shall contain no special limitations on the scope of protection afforded to the City, its officets, officials, employees or volunteers.

The Subdivider's insu{ance coverage shall be primary insurance as respects the City, its officers, officials, employees and volunteers. Any insurance of self-insurance maintained by the City, its officials, employees or volunteers shall be excess of the Subdivider's insurance and shall not contribute with it. 4 c
B

Page 101 ends

06/14/2022 Item No.9.

Any failure to comply with reporting provisions of the policies shall not alfect coverage provided to the City, its ofticers, officials, employees or volunteers.

D The Subdivider's insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the limits of the insurer's liability.
2 Worker's Compensation and Employers Liability Coverage. The insurer shall agree to waive all rights or subrogation against the City, its officers, oflicials, employees and volunteers for losses arising from work performed by Subdivider for the City.

All Coverages. Each insurance policy required by this clause shall be endorsed to state that coverage shall not be suspended, voided or cancelled by either party, reduced in coverage or in limits except after thirty (30) days prior written notice by certified mail, return receipt requested, has been given to the City.

Acceptability of Insurers. Insurance is to be placed with insurers with a Best's rating of not less than A: VII.

Verit'igrtLion of Coveragc. Concurrently with the execution of this Agreement, the Subdivider shall furnish the City with original endorsements affecting coverage required by this clause. The endorsements for each insurance policy are to be signed by a person authorized by that insurer to bind coverage on its behalf. The City reserves the right to require complete, certified copies of all required insurance policies at any time.

Title to Improvements. Title to and ownership of the required public improvements constructed under this Agreement by Subdivider shall vest absolutely in the City upon completion and written acceptance of such improvements by the City Engineer. The City Engineer shall not accept the required improvements unless Subdivider certifies that such improvements have been constructed in conformity with the approved plans and specifications, approved modifications, if any, the approved Final Map, City Improvement Standards and Standard Construction Specifications, any applicable City Ordinances or State and Federal laws and after 35 days from the date of filing of a Notice of Completion.

Warranty Security. Prior to acceptance of the required improvements by the City Engineer, the Subdivider shall provide security in the amount and in the form as required by the City Engineer to guarantee the improvements against any defective work or labor done or defective materials used in the performance of thc required improvements (Warranty Security) throughout the wamanty security period which shall be the period of one year following completion and written acceptance of the improvements (Wananty Security Period). The amount of the Warranty Security shall not be less than 10 percent of the cost of the construction of the improvements, including the cash deposit required in paragraph 5C of this agreemento which shall be retained for the Warranty Security Pcriod. 5 C.
-l
d
e.
9 10

Page 102 ends

06/14/2022 Item No.9.
11 12.
13 t4
Repair or Recpnstruction o1'Defective Work or Matetiltls. If, within the Warranty Security Period or the applicable statute of limitations, whichever is longer, any improvement or part of any improvement furnished and/or installed or constructed by Subdivider or any of the work done under this Agreernent fails to fulfill any of the requirements of the Agreement or the specifications ret'erred to herein as determined by the City, Subdivider shall without delay and without any cost to the City, repair, replace, or reconstruct any defective or otherwise unsatisfactory part or parts of the required improvements. If the Subdivider fails to aot promptly or in accordance with this requirement, or if the exigencies of the situation require repairs or replacements to be made before the Subdivider can be notified, then the City may, at its option, make the necessary repairs or replacements ot perform the necessary work, and Subdivider shall pay to City the actual cost of such repairs plus tifteen percent (15%) within thirty (30) days of the date of billing for such work by City. The parties further understand and agree that the Warranty Security furnished pursuant to paragraph l0 of this Agreement shall guarantee and secure the faithful performance and payment of the provisions of this paragraph during the Warranty Security Period.

Subdivider Not Aqent ol'Clity. Neither Subdivider nor any of Subdivider's agents or contractors are or shall be considered to be agents of City in connection with the performance of Subdivider''s obligations under this Agreement'
NqJice of Breach and Default. If Subdivider refuses or fails to prosecute the work, or any part thereof, with such diligence as will ensure its cornpletion within the time specified, or any extension thereof, or fails to complete the work within such time, or if Subdivider should be adjudged a bankruptcy, or Subdivider should make a general assignment for the benefit of his creditors, or if a receiver should be appointed in the event of Subdivider's insolvency, or if Subdivider or any of Subdivider's contractors, subcontractors, agents or employees should violate any of the provisions of this Agreement and the City may, but is under no obligation to, serve written notice upon Subdivider and Subdivider's surety, if any, of breach of this Agreement, or of any portion thereof.

Blgaqlr of Agreement: Per -brrnance By Surqty or Citv. In the event of any such notice, Subdivider's surety, if any, shall have the duty to take over and complete the work and the required improvements; provided, however, that if the surety within fifteen (15) days after the serving of such notice of breach upon it does not give the City written notice of its intention to take over the performance thereof within fifteen (15) days after notice to the City of such election, then the City may take over the work and prosecute the same to completion by contract, or by any other method the City may deem advisable, for the account and at the expense of the Subdivider, and the Subdivider's surety shall be liable to City for any excess costs of damages incurred by the City;and in such event, the City, without liability for so doing, may take possession of and utilize in completing the work, such materials, appliances, plant or other property belonging to Subdivider as may be on the site of the work and necessary therefor,
If the form of improvement security is other than a bond, then the City, after giving notice of breach of the Agreement, may proceed to collect against the improvement security in the manner provided by law and by the terms of the security instrument. 6

Page 103 ends

06/14/2022 Item No.9.
l5 Notices. All notices required under this Agreement shall be in writing, and delivered in person or sent by registered or certified mail, postage prepaid.

Notices required to be given to City shall be addressed as follows:

City of Folsom
Community Development Department
50 Natoma Street
Folsomo CA 95630
ATTN: Cify Engineer
Notices required to be given to Subdivider shall be addressed as follows:

Toll West,Inc. which will do business in California as Toll Brothers West,Inc., a Delaware Corporation
2330 East Bidwell Street, Suite 20L
Folsomn CA 95630
ATTN; Greg Van Dam, Vice President - Land Dcvelopment
Notices required to be given surety, if any, of Subdivider shall be addressed as follows Any party of the surety may change such address by notice in writing to the other party and thereafter notices shall be addressed and transmitted to the new address.

16. Attorne),'s Fees. In the event any legal action is brought to enforce or interpret this Agreement, the prevailing parfy shall be entitled to an award of reasonable attorney's fees, in addition to any other relief to which he may be entitled.

17. Assignment. This Agreement shall bind and inure to the benefit of the assigns, successors in interest, heirs, executors, and administrators of the parties, and the parties agree that the City may cause a copy of this Agreement to be recorded in the Sacramento County Recorder's Office.
7

Page 104 ends

06/14/2022 Item No.9.

IN WITNESS WHEREOF, the parties have executed this Agreement as follows:

SUBDIVIDER
Toll West,Inc. which will do business in California as Toll Brothers Westr Inc., A Delaware Corporation
BY BY:

Print Name: Print Name:

Title: Title
DATE DATE:

CITY OF FOLSOM, a Municipal Corporation
DATE
Elaine Andersen

CITY MANAGER
ATTEST:

DATE
Christa Freemantle

CITY CLERK
APPROVED AS TO CONTENT:

DATE
Pam.lohns

COMMUNITY DEVELOPMENT DIRECTOR
APPROVED AS TO FORM:

Steven Wang

CITY ATTORNEY
DATE
NOTICE: SIGNATURE(S) ON BEHALF OF ..SUBDIVIDER,'MUST BE NOTARIZED Certificate of Acknowledgement pursuant to Civil Code, Section 1189, must be attached.

SUBDIVISION AGREEMENT - Toll Brothers at Folsom Ranch Phase lE Subdivision 8

Page 105 ends

06/14/2022 Item No.9.

Slte Preparation
Sanltary Sewer System
Storm Draln System
Potable Water Dlstribution System
Concrete
Streetwork
Mlscellaneous
Street Lights & Joint Trench
Landscaping
Contlngency (10%)

EXHIBITA

FOLSOM PLAN AREA
Bond Estimote Summory
for
Toll Erothers Phase 7E
May9,2Q22
lmprovement Plans for Toll Brothers Phase lE
Total
s 27,500.00
s eos,oo9.00 s
$ 02a,543.7s S
s 620,540.00 $
I +00,635.00 S
$ 023,535.45 $
s L3,760,00 s
Cost to Complete
27,500.00
505,009.00
628,543.7s
620,540.00
450,635.00
623.s35.45

13.760.00
S1, s75.240.00 s 1,575,240.00
s 122,460.00 s t22.460.00
s 467,820.00 $ 467,820.00
35r74
Grand Total Cost of lmProvements $ s,1cs,o4?.20 $ 5,t46,O43.20

Page 106 ends

06/14/2022 Item No.9.

Cost of lmprovements
ITEM
NO. QUANTITY UNIT DESCRIPTION
Slte Pr€prtatlon and Earthwork
l, 27.5 AC Eroslon control
Sanltary Sewer System

UNIT PRICE
s 1,000.00
Subtotal Slte Pleparatlon
AMoUNT % Complete cost to complete
l_,_4l!!qqq*..--0'6 . l- 27,s00'00.

AdJust SanltarY sewer Manhole Rlm
48" standard Sanltary sewer Manhole
4" Sanltary Sewer Servlce
6" Ssnltary Sewer, PVC sOR 26
8" sanltary sewer, PVc 50R 26
s 27,s00.00 S z7,soo.oo
!00.0c

4.500.00 $ 108,000,fiJ Oyo I 108.000.fi0
0t6

60.00 OYt
500.00 $ 50{r.tXt (}tl' $
L,

2. ?
4,
1 z4
146
r,263
3,939
EA
EA
EA
LF
LF
s
$
$ 1,ooo.oo
$
s
$
$ 70.00-
subtotal SanitarY Sewer System t606,009.1,0 s 606,009.00 Storm Draln System

1. 1,313

2. 359

3. 805
4, 7141

5. 462

5. 236

7. Z!4
LL7
9, 10

10. 2

11. 1

72. 77

13. 7

14. 22
5871
1,200
37 40,692
7,040
LF 12" sto.m Draln, RCP cL lll
LF 15" Storm Dreln, RCPCLIII
LF 18" storm Dtaln, RCP CL lll
[F 24" sto.m Draln, RCP Cl lll
[F 30" Storm Dtaln, RCP cL lll
tF 36" Storm Draln, RcP cLlll
[F 42" Storm Draln, RCP CL lll
EA 48" Standatd Storm Draln Manhole
EA 60"standardStotmDraln Manhole
EA 72"StandardStormDralnManhole
EA 96" Storm Draln Manhole
EA Type GoL-7 lon-Gradel Dralnage lnlet
EA Type GOL-lo (on-Gradel oralnage lnlet
EA Modifled Type'B'Dralnage lnlet
_$ 4,!qq4q_ 5 70,5flJ.0t!
5 .l -_ 45,0!

55.00 I
I -,m:0!*65.00

70.00 5 80.00
$ ._. e0.00
s 5.000,00
..., 7,m0.00

9.000.00
745,55
)
.60 o%
OYo
$ 14.500.00 $ o%
o96 5
s 7,500.00
".$- , 3,!-90.00
o%
o%
I 7,500.00
Polable Wet€r Olstrlbutlon System
77 77
Subtotal Storm Draln System s628,543,7s $628,54€.7s

55.00 s 70.00
. 5 _, 1,000.00
s 2,000-00 $ 36,000.00 o% S 35,0r10.00
LF
LF
EA
EA
EA
EA
EA
EA
EA
4,066
L,713
144
18 7
2 5
73 2
8" Water Maln, PVC c900 CL 235
12'' Water Main, PVC c900 CL 235
1" water Servlce
8" Gate valve
12" Eutterfly Valve
4" Blow-off Valve & Box
Remove Blow'Otfvalve & Connect
Flre HVdrant Assembly (5" tead &
2" Alr & Vacuum Release valve
s 2,s00.00
S z,soo.oo
$ soo.oo

3.500.00
s 20,00
!i 20.00

15.m
$ _ s.00
s s,00
$ 5,000,00 0% s il9949-
s1.

2. 3,

4. 5,

6. 7.

8. 9.
0%
$o% L7
7 0y" Is
Subtotal Potable Water 0lstrlbutlon System
Concrete 0*
L.

2. 3,

4. 5.
tF TYPe 1 Rolled Curb & Gutter
LF T},Pe 2 Vertlcal Curb & Gutter
LF Type 5 Medlan Curb
5F Sldewalk(6" Pccl
sF seperated Sldewalk(6" PCC)
t: 0% 5 24,000.m
Subtotal Concrete
P:V954LWEST\Admln\Estlmates\sld'Bond Estlmates\Ts PHlE-Bond Estlmate 'xlrxPage 107 06/14/2022 Item No.9.
stre6twork
Ton Asphalt concrete (TYPe 'B')
Ton A8g.egate Base lclass 2]
LF 12" Whlte Strlpe Llmlt Llne (Stop Unel
LF 6" Pavementstrlplng
sF Pavement Marklngs
EA StopSlgn lRl-Ll on Post
EA streetNameSlsnon Post
LF Street Balrlcade
LF Sldewalk Barrlcade
LF 4" PVC (ScH 80) lrrlgatlon Sleeves
LF 5" PVc (scH 80| lrtlgatlon Sleeves
LoT JolntTrench Excavatlon & BacKlll
LF lolnt Trench lxcavatlon & Backflll
EA LEO Street tlght (lncludlng Condult,
Wlrlng and APPurtenances
Subtotal Street Llghts & Jolnt Trench
$ ).rr!!400.0n .. tJL - $- zsn,a00.t!t..

I lrx,r.84o.oo 016 - $ ryrrylqg :t6t.UO o/o 5 36f ,0O
S _ 8i149_ 861.00,
s 4,612.45 016 $ 4,61?.45
-_--
I {r.o0o.00 Ot6 5 6,000,00
o%
{ 80.001,
I
4,
5,
6,

8. 9.
3,70s
15,042
tat
861
926
74 54
16 -$ - _ 20.qq
. s *,?,00 .
_s *_ __,1,00
s s,00
Mlicellaneous

1. 608

7. 232
Street Llght3 & Jolnt T.ench
Landscaplng
I 12,746
_$_ _--{94q-
$ .. _- soo.oo
$, 60.00
S r!.oo
subtotal Streetwork
i _. 1s.go_
$ 2.0.00
Subtotal Miscellaneous
$ -_.8*g-oq!q-
- 5 180.00 -
-t -. -Ll.goq'gS- s 348,000.00 ord
_ S623,s3s.45
s13,760.00
5 1,r52,00i1.00 m( S 1,r5l,fixJ'otl
3 7s.240.00 ot6 S 75,240.00
s 348,000.00
$ l,szs,e,lo.oo S 1,57s,240,00
. $13,760,00
1 z
3 r44
418
30 $ 10,00 I 122,460.00 o% ssF Landscape & lrrlgalion
Subtotal LandscaPlng
TotEl PhasE 1E
ContlngencY
Total Eond Estlmste
Summarv Phase 1E
Slt€ Preparatlon & Earthwotk
Sanltary Sewer
sto.m Draln
Potrble w8le.

Con€rete
Streetwork
Mlscellaneous
Street Llghts & Jolnt Trench
Ldndscaplng
ContlngenEY
TOTATS
$ 122,46Q-oq
S 4,678,223'20
trglrf:--{q..ctq!g-
I t!!6,!41!0
Total Cost
$ 27,500,00
$ 6o6,ooe.oo
$ q4,s43jzl
$ 6r0,s40.00
S r5o,6ls.oo
s 623,53s.45
s 13,760,00
$ 1,5:t3!9f9.
$ 122,450.00
$ 462,820.00
( 727-.460.00
I 4,6tfl,'?7A,?.0
$ {67,820.00
$ 5,146,013.20
Cost to ComPlete
I 27,500,00
$ 606,009,00
S 628,513.75
s 6205fit.00
$ qoo,egs.oo
623,535.45
$ 13,760.00
l_ l,szs,zco.oo
S 12al050.00
S 467,820.00
$
400.00
P:V964LWE5I\Admln\Estlmates\Bld-Bond EstlmalesvB PHlE-Bond EsUmate 'xlsx $ 5,146,043.20 s 5,1{6,0{i}.20

Page 108 ends

06/14/2022 Item No.9.

BOND #
PREMIUM:

PERFORMANCE BOND
for
Subdivision Improvement Agreement
WHEREAS, The City Council of the City of Folsom, a Municipal Corporation in the State of Califbrnia, and Toll West,Inc. which will do business in California as Toll Brothers West,Inc., a Delaware Corporation, (hereinafter designated as "Principal") have entered into an agreement where by principal agrees to install and complete ceftain designated public improvements, which said agreement, dated 2022, and identified as the Toll Brothers at Folsom Ranch Phase IE Subdivision Improvement Agreement is hereby referred to and made a part hcreof; and, WHEREAS, Said Principal is required under the terms of said agreement to furnish a bond for the fhithful performance of said agreement;
NOW THEREFORE, We, the principal, and
*f","dt"*th.ctf if :fJ;'"I;i:;*':?;l{,$'ffi'i"i"'H*Hffiff s"llT'il6h+"i:f#"' THOUSAND FORTY-THR"EE AND 00/100 DOLLARS ($5,146,043.00), lawful money of the United States, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, successors. executors, and administrators, jointly and severally firmly by these presents.

The condition of this obligation is such that if the above bounded principal, its heirs, executors, administrators, successors or assigns, shall in all things stand to and abide by, and well and truly keep and perform the covenants, conditions, and provisions in the said agreement and any alteration thereof made as therein provided, on its part, to be kept and performed at the time and in the manner therein specified, and in all respects according to their true intent and meaning, and shall indemnifi and save harmless the City, its officers, agents, and ernployees, as therein stipulated, then this obligation shall become null and void; otherwise it shall be and remain in full force and effect.

As a part of the obligation secured hereby and in addition to the face amount specified therefor, there shall be included costs and reasonable expenses and fees, including reasonable attomey's fees, incurred by City in successful enforcing such obligation, all to be taxed as costs and included in any judgment rendered.

The surety hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the agreement or to the work to be performed thereunder or the specifications accompanying the same shall in any way affect its obligations on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the agreement or to the work or to the specifications.

Page 109 ends

06/14/2022 Item No.9.

IN MTNESS WHEREOF, this instrument has been duly executed by the principal and surety ' ,2022
(PRINCIPAL)
BY
(PRINCIPAL)
BY
(sURETY)
(ADDRESS)
(CITY, STATE, ZIP)
(TELEPHONE)

APPROVED AS TO FORM

CITY ATTORNEY
BY

Page 110 ends

06/14/2022 Item No.9.

BOND #

PREMIUM
I.ABOR & MA]'IRIAI"S BONI)
for
Subdivision Improvement Agreement
WHEREAS, The City Council of the City of Folsom, a Municipal Corporation of the State of California, and Toll West,Inc. which will do business in California as Toll Brothers West,Inc., a Delaware Corporation (hereinafter designated as "Principal"), have entered into an agreement whereby principal agrees to install and cornplete cefiain designated public improvements, which said agreement, dated 2022, and identified as the Toll Brothers at Folsom Ranch Phase LE Subdivision Improvement Agreement is hereby referred to and made a part hereof; and, WI{EREAS, under the terms of said agreement, principal is required before entering upon the performance of the work, to file a good and sufficient payment bond with the City of Folsom to secure the claims to which reference is made in Title 15 (commencing with Section 3082) of Part 4 of Division 3 of the Civil Code of the State of California; NOW THEREFORE, said principal and the undersigned as corporate srrety, are held firmly bound unto the City of Folsom and all contractors, subcoritractors, laborers, materialmen and other persons employed in the performance of the aforesaid agreement and referred to in the aforesaid Code of Civil Procedure, in the sum of FIVE MILLION ONE HUNDRED FORTY-SIX THOUSAND FORTY-THREE AND 001100 DOLLARS ($5,146,043.00) for materials furnished or labor thereon of any kind, or for amounts due under the Unemployment Insurance Act with respect to such work or labor, that said surety will pay the same in an amount not exceeding the amount hereinabove set forth, and also in case suit is brought upon this bond, will pay, in addition to the face amount thereof, cost and reasonable expenses and fees, including reasonable attorney's fees, inoured by City in successfully enforcing such obligation, to be awarded and fixed by the court, and to be taxed as costs and to be included in the judgment therein rendered.

It is hereby expressly stipulated and agreed that this bond shall inure to the benefit ofany and all persona, companies and corporations entitled to file claims under'fitle 15 (commencing with Section 3082) of Part 4 of Division 3 of the Civil Code, so as to give a right of action to them or their assigns in any suit brought upon this bond.

Should the condition of this bond be fully performed, then this obligation shall become null and void, otherwise it shall be and remain in tirll force and effect.

The surety hereby stipulates and agrees that no change, extension of time, alteration, or addition to the terms of said agreement or the specifications accompanying the same shall in any manner affect its obligations on this bond, and it does hereby waive notice of any such change, extension, alteration, or addition.

Page 111 ends

06/14/2022 Item No.9.

IN WITNESS WHEREOF, this instrument has been duly executed by the principal and surety above namgd, on ,2022.

BY
(PRINCIPAL)
(PRINCIPAL)
BY
(suRETY)
(ADDRESS)
(CITY, STATE, ZIP)
(TELEPHONE)

APPROVED AS TO FORM

CITY ATTORNEY
BY

Page 112 ends

06/14/2022 Item No.9.

ATTACHMENT 3
Toll Brothers at Folsom Ranch Phase lE Subdivision
Final Map

Page 113 ends

06/14/2022 Item No.9.

OWNER'S STATEMENT CITY ENGINEER'S STATEMENT
BE UNDERSIGNED DOES HEREBY STATE frATWEARE THE ONLY PARTIES HAVINCAW RECORO TME IMEREST IN THE RAL PROPERN NCLIDED WfrIN THE BOUNDARIES OF THIS FINAL ffiP OF TOLL BROTHERS AT FOLSOM RANCH - PHASE 1E" AND DO HEREBY OECLARE THE CONSENT FROM NO OTHER PERSON IS NECES$RY, AND W CONS€NT TO frE PREPAMTION AND RECORDATION OF THIS

I HEREBY STATE THAT I HAVE MMINED THIS FINAL MAP OF 'TOLL BROTHERS AT FOLSOM RANCH - PHASE lE'AND FIND IT TO BE SUBSTANThLLY THE SAME AS IHE ]ENTATIVE MP APPROVED BY THE Cfi COUNCIL OF THE CIry OF FOLSOM, AND THAT ALL PROVISIONS OFTHE SUBDIVISION MAP ACT AND ALLAPPLICABLE CIry ORDINANCES HAVE BEEN COM4IEDWM.

WE DO HEREBY DEDICATE FOR SPECIFIC PURPOSES THE FOLLWNG|

1. A PUSLIC EASEMENT FOR THE INSTALUNON AND MINTENANCE OF DMIN, GAS, SEWER AND WATER PIPESAND FOR UNDERGROUNDWIR€S AND CONDUITS FOR ELECTRICAL, TELflISION ANO

COMMUNICATIONS SERVICES, IOGETHER WITH ANY AND ALL APPURTENANCES PERTAINING NERflO ON, OVER, UNDER AND ACROSS LOTS E, AK, AL, AM, AN AND THOSE STRIPS OF UND SHOWN HEREON AND DESIGMED "PIBLIC UTILfr EASEMENT'lP,U.E.).

2. A PUBLIC EASEMENT FOR PEDESNhNACCESS ON, OVERAND ACROSS THOSE STRIPS OF UND SHOWN HEREON AND DESIGNAED ?ED€SNAN ACCESS EASEMEtr (P3.E.).

STEVEN R, KRAHN. RCE49291
CIfrENGINEER
ctry oF FoLsoM
LICENSE EXPIRES: 09/30/2022
3, A PUBLIC SSEMENT AND RIGHT OF WAY FOR frE INSTALLAION. REPAIR, REMOVAL OR REPUCEMENT OF UNDSCAPING TOGETHER WIfr AW AND ALL APPURTENANCES PERTAINING TAERETO ON, OVER. UNOER, ACROSS ANO ABOVE THOSE STRIPS OF SNOS SHOWN HEREON AND DESIGNATEO'SNDSCAPE EASEMENT" (1,E.),
4, AN EASEMEM FOR INGRE$ANO EGRESS FOR SUPPORTAND USE 8Y UW ENFORCEMENT, FIRE PROTECTION WELFARE AND OffER PUSLIC AGENCIES, THEIR VEHICLES AND PERSONNEL OVER LOT E SHOWN NEREON AND DESIGNATED "EMERGENCYVEHICLE ACCESS ASEMENI" (E,V.A.).

DATE] _

CITY SURVEYOR'S STATEMENT
I HEREBY STATE THAT I HAVE EXAMINED ffIS FIML MAP OF TOU BRONERS AT FOLSOM RANCH PHASElEANDIAMSATISFIEDTHATSAIDMPISTECHNICALLYCORRECT.

5. A PUBLrc ASEMENT FOR CONSNUCTION AND ffiINTAINING CENTMLEED MAIL DELIVERY BOXES,

PEOESTALS ANO SUBS TOGETHER WTH ANY AND ALL APPURTEMNCES PERTAINING THERETO INCLUDING PEDESTRhN ACCESS FOR DELIVERY ANO RECEIPT OF MAIL ON. OVER AND ACROSS STRIPS OF UNO FVE (5) FEEI IN WDTH CONTiGUOUS AND OUTSIOE THE PROPERry LNE

OFLOTE(PRIVATE ROAD),

VICINITY MAP
N.T.S

NOTARY'S ACKNOWLEDGMENT
GERALDA.YOUNG, L,S. 3S2
CIry SURVEYOR
IDENTIW OF THE INDIVIOUAL WHO SIGNED THE MUMENT TO WHICH THIS CERNFrcATE IS

ANACHED, AND NOT THE TRUTHFULNESS, ACCUMCY OR
DAE:_

CITY CLERK'S STATEMENTTOLLWEST INC, WHICH WILL DO BUSINESS IN CALIFORNIA STATE OF CALIFORNh
COUNW OFAS TOLL BROTHERS WEST INC.,
A OELAWARE CORPOMTION I HEREBY SIAE THATruE CIry COUNCILOFBE CIry OF FOLSOM HASAPPROVED THIS FINAL MAP OF ,TOLL BROTHERS AT FOISOM MNCH - PffiSE 1E', AND AAS ACCEPTED, ON BEHALF OF THE PUBLIC, SUBJECT TO IMPROVEMENTS ALL RIGHT$OF-WAY AND EASEMENTS OFFEREO HEREON FOR OEDI*IION IN ACCORDANCE WITH THE TERMS OF TMT OFFER ANO HAS APPROVED THE ABANDONMENT OF THEEASEMENTS LISTED HEREON,NAME]
TITLE
DATE

ON- BEFORE ME,-, A NOTARY PUBLIC
PERSONI LLY ADPEAqED
-

WHO PROVED TO ME ON THE BASIS OF SATISFACTORY WIDENCE TO BE THE PERSON(S) WHOSE

NAME(S) IS/ARE SUBSCRIBED TO THE WITHIN INSTRUMENT AND AC(NOWLEDGED TO ME THAT HE/SHffiil EXECUGD TNE SAME IN AS/H€ilHEIR AWHORIZED CAPACIfl(ES), AND TilT BY HPHERMflR SrcMruRE(S) ON THE NSNUMENTTHE PERSON(S), OR THE ENTN UrcN BEHALF OF

WHICH THE PERSON(S)ACTED, SECUED THE INSTRUMENI
NAME'
IITLE:

DATE I CERTIfl UNDER PENALW OF PERJURY UNDER THE UWS OF THE STATE OF CALIFORNIA THATTHE FOREGOING PAMGMPH IS NUEAND CORRECT.

CHRISTA FREEMANTLE
CIryCLERK
WNESS W HAND AND OFFICIAI S4L.

SURVEYOR'S STATEMENT
THIS MP WAS PREPARED BY ME OR UNBER MY DIRECTION AND S MSED UPil A FIELD SURVry N CONFORMNCE WA fE REOUIREMENIS OF NE SUBDVISION MP ACT AND LMAL ORDINANCE AT THE REOUEST OFTOLLWEST INC. WHICH WLL DO BUSINESS IN SLIFORNA AS TOLL BROTHERS WESI INC,. A DEUWARE CORPORAT€N IN APRIL 2021 , I HEREry STATE THAT frIS FINAL MAP SUBSTANThIY coNFoRMs To THE coNDmoMLLY APPRoVED IENTATIVE MAP| THAT THE MoNUMENTS WLL BE OF THE CilMCT€RANDWILL OCCUPY THE POSITIONSAS INDICATED AND WLL SE SET BY DECEMSER 31,2024, AND THATSAID MONUMENTS WILL BE SUtrICIENTTO ENABLETHE SURVEY TO BE RETRACEO.

SIGNATURE PRINTEDMME
MY PR|NC|PAL PUCE OF BUSINESS lS_COUNry

RECORDER'S STATEMENT
wcoMMrssrs COMMISSION NUMBERI
FILED TH|S.'....''..'.'..._ DAy OF _ 2V2, AT _.M. tN BOOK OF MPS,

AT PAGE
-
AI IHE REOUEST OF MCMY & SOMPS CIVIL ENGINEERS INC. NTLE TO THE UNO INCLUOED IN BIS FINAL MAP BEING WSTED AS PER CERNFISTE NO. ON FIIE IN BISOFFICE.

NOTARY'S ACKNOWLEDGMENT

A NOIARY PUBTIC OR OTHER OFFICER COMPLETING THIS CERTIFICAE VERIFIES ONLY THE IOENTfr OF THE INDIVIDUAL WHO SIGNED THE DOCUMENT TO WHICH THIS CERNflCATE 15 AfrACHED. AND NOT THE TRUTHFULNESS, ACCUMCY OR VALIDIW OF NAT MUMENT, DOCUMENTNO.:_

MACXAY &SOMPS CVILENGINEERS, INC, DONNAALLRED
SACMMENIO C@NW RECORDER
STATE OF *LIFORNh

FOR REVIEW ONLY
STATE OFCAIIFORNA FEE: $_
PAULFERGUSON JR.,N592S
ilPIMTION OATEi MARCH 31, 424
c@Nfl oF_
ON- BEFORE NOTARY PU8lIC
DrE______jfi@__ PERSONALLYAPPEARED-
wHo pRoED ro ME oN ne mss or srrsrnEi6FiEi6Ei6ET6-ETETEn-66= NAMEIS) IgARE SUBSCRIBED TO THE WNN INSTRUMENT ANO ACKNOWLEDGED TO ME TMT HASHtrHEY UECUTED flE SME IN HISEMHEIR AfHORIZED CAPACIfl(ES), ANO THAT BY HIS/HERMAR SIGNATURE(S) ON THE INSTRUMENT THE PERSON(S) OR THE ENTIry UPON AEAALF OF WHICH THE PERSON(S) ACTED, qECITED THE INSTRUMENT,
ICERTIryUNDERPENALryOFPERJURYUNDERTHEUWSOFIHESTATEOFMLIFORNIATNATTHE

FOREGOING PAMGRAPH IS TRUE AND CORRECT,

WMESS W MNDAND OFFICIALSSL
ffi
My pRtNctPAL pucE oF BUSTNESS tS_COUNil
W COMMISSION EXPIRES|_W COMMISSION NUMSER
F|NAL MAP (PN 19-091)

TOLL BROTHERS AT FOLSOM
RANCH PFL{SE 1E
A SUBOIVISION OF LO] 1E OF IHAT CERTAIN FINAL MAP TtrLED 'TOLL BROTHERS AT FOLSOM RANCH PtsASE 18 & 1C'FILED Fffi RECORD SEMMSER 13, 2021 IN BOOK 431 OF MPS, AT PAG€ ].

SACRAMENTO COUNfr RECORDS. BEING IN SECNON 20, TOWNSHIP 9 NORH, RANGE 8 SST, MOUNT

DIABLO MERIDAN
CITY OF FOLSOM . SACRAiiIENTO COUNTY . CALIFORNIA,
NAVD88 BENCHMARK-CIry OF FOLSOM
SENCHMARK'77' ELEVAION:38o.2E NAVDEB
BRASS DISK STAMPEO 'CIW OF FOLSOM BM 7?' ON TtsE NORTHMST CORNER OF A CONCRETE DMINAGE SNUCruRE. LOCATION OF SITE ISAPPROXIMAELY 1SO FEET SOUTH OFTHE IffiRSECTION OF MANGINI FARMAY AND E, BIWELL STREET ON THE AST SIDE OF E. SIOWELL SNEET.

APPROXIMATE UTITUOET N38O 37' 30.01' LoNGITUDE: W 1 21 D 0S 49.04' ELWATION OF380.28WAS ESTABLISHED BYA DIFFERENTIAL LWELCIRCUITFROMCOUW SENCHMARK UO1+O@ STAMPED'KA56'IN FEBRUARY2Ol4 BY MACKAY AND SOMPS CVIL ENGINEERS. INC.

JUNE 2022
SHEET.I OF 9
18 SEE SHEET 2 FOR TRUSTEE'S STATEIVIENT AND ACKNOWLEDGMENT nACKTY&$0mPS
Silffi PWRS SBM
.cA6dr (916)r!r39

Page 114 ends

06/14/2022 Item No.9.

TRUSTEE'S STATEMENT
NAME:

TITLE:

NOTARY'S ACKNOWLEDGMENT
NOTES
FIRST AMERIqN NTLE COMPANY, AS TRUSEE UNDER DEED OF TRUST AND ASSIGNMENT OF RENTS WIfr FIXTURE FILING, RECORDED AUGUST 24, 2020, AS OOCUMENT NUMBER 2O2OOE24O69O AND AMENDED BY DOCIMENT NUMBER20210122@6, RECORDED JANUARY 22,2021, OFFICIAL RECORDS.

HEREBY CONSENTS TO THE RECORDAION OF THIS MAP AND THE SUBDVISION OF THE UNDS SHOWN HEREON.

17.1. ALI CURVE DIMENSIONS ARE RADIUS, DELTA AND ARC LENGTH. ALL OISTANCES SHOW ARE GROUNO DISTANCESANO ARE IN FEETAND DECIMALS THEREOF. DUE TO ROUNDING THE SUM OF frE LANO OESCRIBEO HEREIN LIESWITHIN THE BOUNDARY OFTHECIry OF FOLSOM, COMMUNIry FACILITIES OISTR|CT NO. 18 (FOLSW PUN AREA - W|OE TMPROVEMENTS ANo SERVTCES), AS DISCLOSED il THAT CERTAIN ASSESSMENT MAP RECORDED DECEMBER 9, 2015, AS (8OOK) 201 s1 2@ {PAGE) 427 AND rS SUBJECT TO ANY FUTURE ASSE$MENT BEREOF. . D@UMENT(S) DECURING MODIFICATIONS THEREOF RECORDED NOVEMBER ]6, 2018 AS 8O0K20181116. PAGE q65 0F OFF|CIAL RECORoS.

THE UND DESCRIBED HEREIN LIES WTHIN THE EOUNOARY OFTHE CIfr OF FOLSOM COMMINIfr FACtLtTtES D6nCT NO 23 (FOLSOM RANCH) TMPRWEMENTAREA NO.3, RECOROEDJUNE 8 2020 AS (B@K) 20206@ (PAGE) 1611 AS O|SCLOSED BY THAT CERTATN A$ESSMENT MAP (BOOK)130 oF MAPSAT (PAGE)27 RECORDED APRTL 20,2020 OF OFF|ChL RECORDS. . OOCUMENT(S) DECURING MOOIFISTIONS THEREOF RECORDED DECEMBER 4, 2021 AS BOOK rc21120, PAGE 0572 OFOFFICIAL RECORDS.

THE UND DESCRIBED HEREIN LIES WITHIN THE BOUNOARY OFTHE CIil OF FOLSOM COMMUMry FACtLtTtES D|STR|CT NO. 23 (FOLSOM RANCH) TMPROVEMENT AR4 NO. 7, RECORDED OECEMBER 20,2021 AS BOOX 20211220, PAGE0571 0FOFFICTALRECORDS.

20. PROPERfl SUSJECT TO FOLSOM CORDOVA UNIFIED SCH@L DISTRICT SCHOOL FACILtrIES IMPROVEMENT D]STRICT NO. 3PER [email protected], 0652,

21. ffE UND LIES WITts ftE BOUNDARIES OF PROPOSED SCHOOL FACILITIES IMPROVEMENT D|5TRICTNO.2.

A NOTARY PUBLIC OR OTHER OFflCER COMPLETING THIS CERNFrcAE WRIFIES ONLYTHE IDENTfl OF IHE INDIVIDIAL WHO SIGNED ftE DOCUMENT TO WHICH THIS CERTIFICATE IS AfrACHED. AND NOT THE TRUTN FULNESS ACCUMCY OR VALIDIil OF THAT DOCUMENT, STAE OF *LIFORNA
COUNfr OF
THIS FINAL MAP CONTAINS S,213+ ACRES GROSS CONSISTING OF 147 RESIDENTIAL LOTS ANDoLETTERED LOTS. THE RESIOENTIAL LOTS ARE NUMSEREO WB THE FOLLOWING SEOUENCEST 297 -43. nE LEnEREO LOISARE: E, L, AM, AN, AL ANo AK. "GEOTE*NICAL ENGINEERING STUDY - UPDATE FOR REGENCY AT FOLSOM RANCH" (PROJECTNO.E17053.@2) WAS PREPARED BY YOUNGoAHL CONSULING GROUP, tNC tN MAy, 2019. AND IS AVAIUBLE FOR PUBLIC INSPECTION AT THE CN OF FOLSOM COMMUNIfl

DSELOPMENT DEPARTMFNI

4. ALL FRONT LOT CORNERS WILL BE SET WITH A 1" DIAMETER BRASS DISC STAMPED "LS 9265' ON THE SIOEWALK WITH A ] ,OO FOOT OFFSfl ON BE SIDE PROPERN LINE €XTENDED. {SEE DETATLS HEREON).
5, RAR CORNERS WLL BE SETAS FOLLOWS (UNLESS SHflN OTHERWSE)

5.1- FOR LOTS S0, 301, 310, 311, 341 - 382, 387 - €5, 408 - 424, 44 - €9 AND COMMON LTNES OF 31ffi 1 7, 38236?3843S, S6/3A7re2, 4071408 ANO 42q425 W|LL 8E SET Wm A 18. REilR AND PUSTIC CAP STAMPED'LS 9265",
s.2- FOR LOIS 297, 296, 3@ - 308, 318 - 328, 330 - g0 AND COMMON LTNES OF 299/300, S2/303, 3@810. 312313, 314, 314/315 317t318,32ilX29,426t127,4Al41 AND 4243 W|LL BE Sfl WB A 4.OO FOOT OFFSET ON THE SIDE LOT LINE WITH A
'gREBAR

AND PUSTIC CAP STAMPED
'LS 926y (SEE DETATLTHTS SHEil).

53. FOR LOTS 315, 316, 34 ANO COMMON L|NE OF 38488?386, 407t425, 426t41 AND QTI42AAgINWHICH FAIL WTHIN A MASONRY SOUNO/Rfl&NING WALL, WLL BE SETWff A 3/4' BMSS TAG STAMPED 'LS 926Y TO TNE FACE OF WALL 2.OO FOOT ABOVE GROUND OR ON TOP OF THE WALL.
6, LOI E (PRVATE ROAD) SHOWN HEREON SflALL BE GRANTEO IN FEE SIMPLE TOTHE REGENCY AT FOLSOM MNCH OWNERS ASS@hNON FILED WTH SECRSARY OF STATE, STATE OF cALtFORNtA ON 242021, FtLtNG # 46S707) AS A PRTVATE ROAD Fm THE BENEFTT ANO GENEML USEOFTHE LOTSSHOWN HEREON.
7- LOTS AM, AN, AL. AND AK SHOWN HEREON SHALL BE GMMD IN FEE SIMPLE TO TE REGENCY

AT FOLSOM RANCH OWNERS ASSOCIATION AS COMMON AREAS FOR UNDSCAPINGAND FOR THE BENEFITAND GENEML USE OF THE LOIS SHWN HEREON.
8, LOTL ISAN OPE\ SPACE LOTANDWLL BE DEEDED I\ FEETOTHE CIryOF FOLSOU SY SEPARATE DOCUMENT AND SU&ECT TO THE PRIVATE ROAD EASEMENT (P,R,E.) SHOWN HEREON. THE PRVATE ROAD EASEMENT (P.R,E.) SHOWN ON LOT L IS APPURTENANT TO PARCEL 28, PER DN 202111241370, SHOWN tsEREONANDWILLSE MAINIAINED BYTHE REGENCYAT FOLSOM RANCH

OWNERS ASSOCIATION,

9. A PRIVATE PEDESNhN ACCESS EASEMENT FOR THE SENEFIT AND GENEML USE OF THE MEMAERS OF THE REGENCY AT FOLSOM RANCH OWNERS ASSOCIATION ON. OVER AND ACROSS

BOSE SRIPS OF SND SHOWN HEREON AND OESIGNATED 'PRVAE PEDESTRIAN ACCESS' (P.P.A.).

10. THIS MAP IS A PORTION OF THE VESTING TEMATIVE MAP SUBDVISION, TOLL BROTHERS AT FOLSOM RANCH RESOLUTION NO. 1O4O PASSED ANO ADOPTED 8Y THE CIfl COUNCIL CIry OF FOLSOM, MRCH 10,2020.

INOIVIDUAL DIMENSIONS MAY NOT EOUAL THE OVEMLL DIMENSION.

AUGUST 24, 2020, AS TNSTRUMENT NO. 202m8240893 0F OFF|C|AL RECORDS.

LOT L SHOWN HEREON IS SUBJECT TO frE PHASE 1 - REGENCY AT FESOM RANCH FUEL MODIFICATION PLAN, PREPARED BY MCKAY AND SOMPS, ON FILE IN THE CIfr OF FOLSOM COMMUNIry DEWLOPMENT OEPARTMENT.

AW ASEMENT FOR WATER COURSE OVER ffAT PORTION OF THE UND LYING WTHN ALDER CREEK. TGETHER WTN ANY RIGBTS IN FAVOR OF THE PUBLIC FOR FISHING ANO RECREATION

PIRPOSES OVER THE PORTION OF THE LAND TUT IS PRESEMY COWREO BY WATER DISCLOSEDONASSESSORPSTB@K72PAGE6.

PROPERfr SUBJECT TO THE TERMS AND PROVISIONS CONTAINED IN THE DOCUMENT ENTNED 'AGREEMENT AFFECTING REAL PROPERry (INCLUSIONARY HOUSING AGREEMENT)' PER DN.202r@02615.

2. 3.
18_
DATE

19. ON- BEFORE A NOTARY PUBIIC

22. 23.
24,

25. PERSONALLY APPSRED
-
wHo PRovEoro ME oNTilE sS6 oF@
IgARE SUSCRIBED TO THE WITHIN INSTRUMENT AND ACKNOWEDGED TO ME THAT HSHEtrHry EXECUTED GE SAME IN HIS/HERMEIR AUTHORIZED CAPACIil(IES), AND THAT BY HI9HERtrHEIR SIGMTURE(S) ON ffE INSTRUMENT THE PERSON(S), OR THE ENTN UPON BEHALF OF WHICH THE

PERSON(S) ACTEO, EXECUTED THE INSTRUMENT,
I CERNfl UNDER PENALry OF PERJURY UNDER THE LAWS OFTHE STATE OF CALIFORNIATHAT THE FOREGOING PARAGRAPH IS RUE AND CORRECT.

WITNESS MY HANDAND OFFICIAL SAL

SIGNATURE PRINTED NAME
W PRINCIPAL PUCE OF BUS1NESS IS COUNfr
WCOMMISSION EXPIRES _ MYCOMMISSION NUMBER: _
I FCtrNn

SECTIONCORNER AS NOTED
1/4 SECTION CORNER AS NOTED

CENER OF SECTION AS NOTED
STANDARD CIfr OF FOLSOM MONUMENTWELL STAMPED ''LS 9174 TO BE SET PER (4) 3/4'|RON PTPEWTH COPPER DiSK STAMPED'1S9171^TO BESETPER (4) 3/4'BRASSTAGSTAMPED"LS9171'TOBESfl PER(4)
5/E REBAR WtrH PUSTIC CAP STAMPED'LS 57@ TO BE SET PER (3) 5/8',REEARWTH PUSTC CAP STAMPED"LS9l7l'TO BE SETpER (4) SET STANDARD CIry OF FOLSOM MONUM€NT WELL STAMPED "LS 9265' PIRSUANTTOSECTION 664}(G) OFTHE SUBDIVISION ACTTHE FILiNG OFTHIS FINAL MAPSHALL CqSTTE ABANDONMENT OF THE SSEMENT LISTED BELOW NOT SHWN HEREON:

4.18.5'WDEANDl2.SWIDEPUALrcUTLIflASEMENT(P-U.E.)WTHINLOT1EPER431B.M,1. o
Eo
o
xtg
o
g
tr
o
B.M.
gNDY
ctr
o.c.R.

DN
E.VA.

H,O,A.

LO.O.
!.E.
(oA)
P.R.E.

P.U.E.
{R)
s.F,
s.s.E_

11. 12.

PROPERry SUBJECT TO COVENANTS. CONDITIONS AND RESTRICTIONS AS CONTAINED IN IHE DEED FROM CATHERINE HOLTHOUSE MNGINI AND ABERT D. MANGINI (WHO ACOUIREO TITLE AS ALBERT D, MANAGIND, WFE AND BUSSAND, RECORDED SEPTEMBER 12, 2002, (SOOK) 2OO&912 (PAGE) 282, OFFICIAL RECORDS ANO RE{ECORDED MY 9, 2007, (BOOK) 20070S9 {PAGE) 525, OFFICAIRECORDS.

BASIS OF BFARINGS

REAR LOT LINE
5/8
s

REAR LOT CORNER
ilPICAL4'OFFSil
JUNE 2022
SHEET 2 OF 9
PROPERry SUBJECT TO THE TERMS AND PROVISIONS CONTAINED IN THE DMUMENT EMTLED "FIRS'AMENDEDAND RESTATEO TIER 1 DEVEIOPMENTAGREEMENT RECOROEOJILY 15,2014AS SET3/4'IRON PIPEWTH PLASTIC PLUG STAMPED'LS 92S"
SET 5/A' REEAR WTH PUSIC CAP STAMPED "LS 9265'
Sfl 3/4' BilSS TAG STAMPED 'LS 9265^

DIMENSION POINT

RECORO OATA PER REFERENCE
ACRES

BOOKOFMAPS

BOUNDARY

CENTERLINE

DECURANON OF COWENTS AND RESTRICTIONS
DOCUMENTNUMBER, O.R.

EMERGENCY VEHICLE ACCESS EASEMENT

HOMEMNERSASSOCATION
IRRWOCABLE OFFER OF DEDI*NON

UNDSCAPE EASEMENT

OVERALL
OFFIChL RECORDS OF SACRAMENTO COUNry
PEDESTRhN ACCESS EASEMENT
PRoPERTLNE (t

PARCELMAP
PRIVA-E DEOES?RIAN ACCESS (SEE NOIE 9)
DRIVA'E qOADWAV ASEME\T ISEE NOE 1OI
PUBLIC frILP EASEMENT

PRIVATE ROAD
RADIAL BEARI\G

RECORDOFSURVEY
RIGHT.OF.WAY
SOJARE FEEi

SNTARY SEWER ASEMENT
BOOK 20I40715, PAGE 426 OF OFFICAL RECORDS.
. OOCUUENT(S) OECURING MODIFCATIONS THEREOF RECORDED JANUARY 29, 2016 AS BOO( 201 601 29. PAGE 0381 0F OFECTAL RECORDS.
. rcCUUENI(S) DECURING MODIflCATIONS THEREOF RECORDEO JANUARY29, 2015 AS BOOK 20160 I 29. PAGE 0382 OF OFFICIAL RECORDS.
. D@UMENT(S) DECURING MODIFICATIONS THEREOF RECOROED OCTOBER 6, 2O2O AS 8OO( 4201M. PAGE 13I1 OF OFFICIAL RECORDS.
. ,PARML ASSIGNMENT AND ASSUMMON AGREEMENT RELATIVE TO THE FOLSOM SPECIFIC PUN AMENDED AND RESTATED TIER 1 DryELOPMENT AGRE€MENT' RECORDED

THE BASIS OF EEARINGS FOR NE MP IS THE
SSTHWESTERLY LINE OF LOT 1E AS SHOWN ON THAT

CERTAIN FINAL MAP NTED 'TOLL BROTHERS AT FOLSOM
RANCH PHASE 18 & 1C'FILEO FOR RECORD ON
SEPTEMBER 13.2021 IN BOOK 431 OF MAPS, AT PAGE 1,
SACRAMENTO COUNft RECORDS AND HAVING A BEARING
OF NORB 43'02'29' WEST BEruEEN THE FOUND
MONUMENTS SHOWN HEREON.

REFERENCES
{1) 431 B.M. 1 (TBPHASElB&lC)
12) 4368.M.7(TBPHASElD)
(3) 236P.M.10
(4) ON 202204110367(CERTIF|CATEOF

CORRECTION)

SHEETINDEX NUMBER

BOUNDARY

LOI LINE

LOT LINE & RIGHT OF WAY

EXISTNG RIGHT-OF-WAY

CENTER LINE
ilSEMENTLINE

SECTION UNE
ADJACENT PROPERilLINE

MUNICIPALLIMITS
13, PROPERry SUBJECTTOTHETERMS, CONDfiONS. PROVISIONSAND SNPUUTIONSAS CONTAINED IN THE AGREEMENT ENTNLED 'WATER SUPPIY AND FACILtrIES FINANCING PUN AND AGREEMENT, BYAND 8EM€EN THE CIfl OF FOLSOM, AND FOLSOM RAL ESTATE SOUTH, LLC, ET AL, RECORDEDJANIARY 24,2013, (BOOK) 20130124IPAGE) 1382, OFFICIAL RECORDS;AMENDMENI IO fiE WATER SUPPIY AND FACILITIES FINANCING PBN AND AGREEMENT. RECORDED JUNE 3, 2014, BOOK 20140603 PAGE 959, oFFICAL RECORDS| ANo AMENDMENT TO THE WATER SUPPLY AND FACILITIES FINANCING PSN AND AGREEMENI RECORDED JUNE 3,2014, Bq 20140603, PAGE 960. OFFIChL RECORDS.

14. THE UND DESCRIBED HEREIN LIES WTHN THE BOUNDARY OF THE CW OF FOLSOM CSMUNIW FAC|LIT|ES D|STR|CT 201!1 (WATER FACTL|T|ES & SUPPLY) AS DTSCLOSED By THAT CERTATN A$ESSI4ENT MAP RECORDEo DECEMBER 30,2013, N (BOd) 20121230 (PAGE) 3]1, AND tS SUSJECT TO ANY FUTURE ASSESSMENT THEREOF.
15, PROPERW SUEJECT TO AN SSEMENT OVER SAID UND FOR AVISNON AND INCIDENTAL PURrcSES, S GMNTED IO IHE COUNTY OF SACMMENTO ANO THE CIry OF FqSOM, IN DEED RECORDEDJULY15,2014, (BOOK)rc140715(PAGE)427 OFF|C|ALRECORDS.

16. THE BND DESCRISED HEREIN LIES WITHIN frE SOUNDARY OF THE CIry OF FOLSd COMMINIry FACtLtTtES D|STR|CT NO.17 (WLLOW H|LL PTPELTNE), AS DTSCLOSED By THAT CERTATN ASSESSMENT MP, RECORDED FEBRUARY 24, 2015, AS (8OOK) 201$224 (PAGE) 424, AND tS SUBJECTTOANY FWRE ASSESSMENT THEREOF.

A SUBDIVISION OF LOT 1E OF THAT CERTAIN FINAL MP TITLED'TOLL BROTHERS AT FOLSOM RANCH PHASE 18 & IC" FILED FOR RECORD SEPEMBER 13, 2021 IN BOOK €1 OF MAPS. AT PAGE 1, SACRAMEMO COUNry RECORDS. BEING IN SECTION 20. TOWNSHIP 9 NORTH, RANGE 8 SST. MOUNT DIABLOM€RIDIAN
FINAL MAP (PN 19-091)

TOLL BROTHERS AT FOLSOM
RANCH PHASE 1E
CITYOF FOLSOIVI . SACRAMENTO COUNTY . CALIFORNIA
mACnY&$omPSdcrxffi PwNEs sffim
I'DIA.BRASS DISK(frP)
orl\l

FRONT LOT CORNER - ATTACHED SIDEWALK
TYPICAL 1'OFFSET
=l-G tt
H It
E ler
l6
5

Page 115 ends

06/14/2022 Item No.9.

27.9f,(1)
L=82"57'22
L=28.s'(1)
--7220
il P.P.A.(1) I
232
231 TOLL BROTHERS

AT FOLSOM RANCH
PHASE 18 & lC
431 BM 1

TOLL BROTHERS
AT FOLSO]V RANCH
PHASE 1 D
436 B.M. 1 162.'l
// PARCEL 28
DN 202111241370
& DN 202111241369
(PARCEL 2A - 2i6 P.M. r0)
Curue Table
Lenglh

28.42'

45.19'

30.02'

24.44'

31.42'
Ddb
82'33!6',
34539^
86'00'00'
1'S1t
90'00 00"

20.00 794.00'

20.00 706.00'

20.00 c1 (r)
c2 (1)
ca(1)
c4(1)
cs(1)
194
I
253
.230I T16
1t4
109
I
228
229
214
II
I
?5ln'l'=1$' sEEDETATL'3A"

ON THIS SHEET

TOLL BROTHERS AT FOLSOM RANCH
PHASE 18 & 1C
4J1 B.M.1 253
'u i'
178 179
161
160
77 J
2ft.!o' r_i
Line Table

4.00 20.12

19.92'

31.20 49.89'

51.63'

6.15',

4.00'

51.09',
B€.inE
N06'451 3"E (R)
N0047 25W
N0017 ?5W
N22'S!9W
N80'$'fl'E
N24'0854
N43'*r6W (R)
N42"4 05'E
N47a 3',55v (Rl
N42'@ 12W
Lr (1)
L2 \1)
L3 (1)
L4 (1)
s (1)
L6 (1)
L7 (1)
L8 (1)
L9 (1)
110 (1)
\ r73 114 175
171 172
Line Table
Lengih

49.27'

49.03'

50.00'

75.00 46r9'
170.00'

4.33 10030'

4.71 34.50
&ainq
N38'00'32'W
N32'5320'W
NS'37'55'W
N49'27'24"W
N30'37'5flW
N23"3615W
N30"3755W
N82'51ro',W
N59"22'6'E
Lr r (1)
112 (1)
Lr3 (1)
114 (1)
115 (r)
116 (1J
117 (11
118 (1)
L1e o
a0 \2)
t\
227 200 zot ! zoz
L=78.$'(1)
(
226
I
225
224
BAS\S
142
I
11i p/'l
223
222
221

FOLSOMLMTS
20120131 0.R.885
L
259
A',,
260
\266
265
ro1
'

98.32'(1)
147.82'(1\

41.s11)
264
,r',.0.0."ar--{
20170329 0.R 0527
\
PARCEL 14
236 P.M. 10
,l
N28'1442"W
D3 RIGHT OF WAY
'... l- -
R=20,00'
L=31.42'(1)

1.411)
LOT E
0 60 120 240
--:

SCALE: 1"=120'
I
i
* ,.o.0. oar-l
20170329 0.R0527
+
F|NAL MAP (PN 19-091)

TOLL BROTHERS AT FOLSOM
RANCH PHASE iE,
A SUBDIVISION OF LOT IE OF THAT CERTAIN FINAL MAP ITLED 'TOLL BROTHERS A1 FOLSOM RANCH PHASE IB & lC" FITED FOR RECORD SEPEMBER 13, 2O2I IN BOOK 431 OF MPS. AT PAGE 1.

SACRAMENTO COUNfr RECORDS. BEING IN SECTION 20, TOWNSHIP 9 NORIN, RANGE 8 AST. MOUNT DIASLO MERIDhN
CITYOFFOLSOM . SACRAMENTOCOUNTY . CALIFORNIA
mmnY&somPs JUNE 2022
SHEET 3 OF 9AGNC$ PUiNES $Mffi1o6ft.bdRq'otu sdbrs RdaB cae$73 pEr/'rs 372
I
I
DETAIL'3B"
SCALE 1'= 60'
SEE SHEET 2 FOR NOTES, BASIS OF BEARINGS, LEGEND AND REFERENCES 341 ll-J--A;-
339342
338343
337344
336345
346
9 347
348
332g9
331
330
350
110 It[e
rr r l$i;
351
17r
112IJ
360
3$
355
354
353
352
115
36'l
359
358
357
362
180!i
364
425424
$
stz"
\
r
310
303
=
=g
u
o
U
U
Fo
a
o
FUUEF
I
=II
UEo
I
435
434
436

0., (-r-)

LOT E (PRVATE RD)
LOT E

LOTE RIVE
?
IA
Fox(o-
LO7
G
ozUoUt
t&
tol
I
T
/'l
I
LOT L
IJ._ tl
--7
LOT

70.5AnB(1)
LotL---

Page 116 ends

06/14/2022 Item No.9.
_//
1)
SEE SHEET 2 FOR NOTES, BASIS OF BEARINGS, LEGEND AND REFERENCES 2J6 P.M. 10
56'IOD PER
2017038 0.R0527
L-
I

TOLL BROIHERS

AT FOLSOM RANCH
PHASE 18 & 1C
431 B.M. l
Line Table
tengb

24.V'
4io
Beann9
N67'EJ 1'E
NS"1513"E(R)
L1
u(1)

CENTERLINE

ALDERCREEK

OPEN SPACE
o.4,
(,
-(

ALDERCREEK
^^sj6$ SEE SHEET 3 Curue Table
Lenglh

79.07'
Dela
15'6!5'
5'&06'
300.m'
300.00
c1
c?
261
I
\ VD.c.R.Pffi
0N201912171594

TOLL BROTHERS

AT FOLSOM RANCH
PHASE IB & 1C
431 8.M.1
LOT L

9.$84C
a"
1 a' 22422'
-q-
219
I
I
22 218
217
PARCEL 28
DN 24211124137A
& DN 2021r1241J69
(PARCEL 2A - 236 P.M. 10)
N
216
8-\
t22
':
400
!
!
{
387^d
.y
+
/
F|NAL MAP (PN 19-091)

TOLL BROTHERS AT FOLSO
RANCH PHASE 1E
I
M
A SUEDIVISION OF LOT 1E OF T4T CERTAIN FIML MAP TITLED TOLL BROflERS AT FOTSOM RANCH PUSE 18 & 1C'FIIED FOR RECORD SEPTEMEER 13, 2021 IN BOOK 431 OF MPS, AT PAGE 1, SACMMENIO COUNfl RECORDS. SEING IN SECTTON 20, TOWNSHIP 9 NORB, RANGE 8 4ST, MOUNT

DIABLOMERIDAN
CITYOFFOLSOM . SACRAMENTOCOUNTY o CALIFORNIA
mACltY&somPsilGrNffi P4Xft SUffiOBilAturdrR4hr su6rsRds,il$6ft €r6)r!tre JUNE2022
SHEET 4 OF 9
304
0204080
-
SGLE: 1"=40'
J834t2zI 382
SEE SHEET 6
SHEET4 OF 9
401
5,773SF
406 18.5'
8,W SF
1tP,U.E,

19.9211)
404

6.630 SF
I
I
{
303
4,S3SF
125 P.U.E.-J
I
a=2'0359 i

Page 117 ends

06/14/2022 Item No.9.
217
21 6
401
215
.s TOLL BROTHERS

AT FOLSOM RANCH
PHASE ]B & ]C
431 B.M. l214
386
\ 213
212
382
211
210

12.5'P.U.E.(1)w381
)-
380 ,/^ -
,o a"/
1/
,!{
% // 195
o378
/ 196
0204080
--:

SCALE:1"=4O'377 27', ,'
,t/i
d"-Y,'
/'-r\""
197
P.U.E.(1)
316
F|NAL MAP (PN 19-091)

TOLL BROTHERS AT FOLSOM
RANCH PHASE 1E
A SUBOIVISION OF LOT 1E OF THAT CERTAIN FINAL UP TNEO 'TOLL EROTHERS AT FOLSOM RANCH PHASE 18 & lC'FIL€D FOR RECORD SEPEMBER 13, 2021 IN BOOK 41 OF MM. AT PAGE I, SCMMEMO COUNil RECORDS. BEING IN SECTPN 20, TOMSHIP 9 NORfr, MNGE E ilST, MruNT

DIABLO MERIDIAN
CITYOFFOLSOM . SACRAMENTOCOUNTY o CALIFORNIA
/"-i.,-
198 TOLL BROTHERS
193 AT FOLSOM RANCH
PHASE 18 & ]C12.s P.U.€.(1)!/ 4Jr 8.M.1
/ ,q,
JUNE 2022
SHEET 5 OF 9
393
8,675SF

12.5'p.u.E.-y
7,4125F
).
125 P-U-E.
391
5,391 SF

12.5 P.U.E.
400q7S SF
389
6 181 SF
388
6,32 SF
SEE SHEET 2 FOR NOTES, BASIS OF BEARINGS, LEGEND AND REFERENCES i or,
199
mACfrY&s0msqcils uixEre sffiffid9F3 pt)t!r1s

Page 118 ends

06/14/2022 Item No.9.
305
4,7SSF
312
5,4SSF
308
6,561 SF
378
5,245 SF
(.12.5'P.U.E.
380
4,8m SF
383
7,590SF
L=27_54'/
412
8554SF
413
9,792SF
a
416
6,559SF
420
9,057SF
418
8,551 SF
l--12.5 P.u.E.

I
SEE SHEET 4
ttil:1
l',|\
I orr"o^,*r, I
i
-CENERL|NE
oF /
I

ALDER CREEK
//
t/1/
|,,
JoJ 12.5'P.u.E.--/
JI 22'22' F|NAL MAP (PN 1e-091)

TOLL BROTHERS AT FOLSOM
RANCH PHASE 1E
A SUEDIVISION OF LOT 1E OF THAT CERTAIN FIN{ MP TITLEO'TOLL SROTHERS AT FOLSOM RANCH PHASE 18 & lC^ FILED FOR RECORD SEPEMBER 13, 2021 IN BOOK €1 OF MAPS, AT PAGE 1, $CRAMENTO COUNfl RECORDS. BEING IN SECTION 20. TOWNSHIP 9 NORTH, RANGE 8 SST, MOUNT

DIABLOMERIDIAN
CITY OF FOLSOM . SACRAMENTO COUNTY r CALIFORNIA
ntcnY&s0mPsil@Ere PW@ $Rwffi.qsm €Qtlre
JUNE 2022
., SHEET 6 OF 9
l*12.s'P.U.E.
/ 3a+
386
387
I
,5
lsi
22 ,v
r12.5 P.U.E.
--@-
-
/
;v 388
?
389
a
Curye Table
Lenglh
12,79
&Xa
24',X37',30.00c1
Line Table

12.63 Beain!
N01'37'52',WL1
393
0204080:-:

SCALE:1"=40'

TOLL BROTHERS

AT FOISOM RANCH
PHASE 18 & 1C
431 B.M. l
2A,
'\B,"Arlii,"*,
/
/*o
/a
/F
/s
/,*
t90
I
I
\
LOT L

9.368ilC

OPEN SPACE
391
l
193
192
.P
I
./
Il
i,
!I
t\
I
I
.* ) !=13 8r
'vx.'i*,
i
I
I
i
l
I
I
2?
i
t
PARCEL 28
DN 2021r124r370
& DN 2021 r t241369
(PARCEL 2A - 2J6 P.M. 10)
\, \, APPR.'TMATE
\/<,lfllFtiltE'?'
\
191
190
189

12.s P.u.E.--l "l
422
313 \zz
\
409
SEE SHEET 7
F12.5 P.U.E.22'
373
SEE SHEET 2 FOR NOTES, BASIS OF BEARINGS, LEGEND AND REFERENCES SHEET6 OF 9

Page 119 ends

06/14/2022 Item No.9.

I
!
I
a 421
,a:2]:5!'!5-
SEE SHEET 6
410
37422'f
I
189U?
i\
31)\1186.14(1XOA) 2'
PER
190
J67

TOLL BROTHERS

AT FOLSOM RANCH
PHASE 18 & lC
431 B.M.1

APPROXIMATE

CENTERLINE OF

ALDER CREEK
LOT L

9.368$C
\ oPEN SPACE
2A191217159
D.C.R.PER
DN20191217159
PARCEL 28
-\
i\
PI
li
Fl
d
) +
DN 20211124',rJ70
& DN 2021 1 1241369
,/t
\
(PARCEL 2A - 2J6 P,M, 10)
o
72 i\
ts\I
318
B-A
22 22
i
I
I
!
L
AY 188- _Ics?c€s$!c_:
tttt
r87

TOLI BROTHERS

AT FOLSOM RANCH
PHASE ]D
436 B.M.7I
I
I
I
I
i
22 Line Table
Leigh

6.15'
Beadng
N42'46!vEL1
186
185
LOT L
9368rAC

OPEN SPACE
,l \o.c.R.eER
I DN 201912171594
z2
LOT E
P.U.E./EJ.A,
12' j
144
428

APPROXIMATE

CENERLINEOF

ALDERCREEK

39.7411)
322.26(1XOA)
?1
MAP (PN 19-091)

TOLL BROTHERS AT FOLSOM
RANCH PI{ASE 1E429
43S
A SUBDIVISION OF LOT 1E OF fiAT CERTAIN FINAL MAP TITLED 'TOLL BROTHERS AT FOSOM RANCH PHASE 18 & 1C' FtrED FOR RECSD SEMMEER 13, 2021 IN BOOK 431 OF MPS, AT PAGE 1, SACRAMENTO COUNfl RECORDS- EEING IN SECNON 20, TOMSHP 9 NOffi, RANGE E SST, MOUNT

DAELOMERIDAN
CITY OF FOLSOM . SACRAMENTO COUNTY . CALIFORNIA
430
SEE SHEET 8
SEE SHEET 2 FOR NOTES, BASIS OF BEARINGS, LEGEND AND REFERENCES MAGIAY&SONPSilGITffi PWEF sffiGi0?5(:t!.M&.oh s&ft.R0*.ils73 (96)tlre JUNE 2022
SHEET 7 OF 9
408
5,S3SF
6z
s
2 409
6,g9SF
l=14.95d.3.25S'R:250.00,
g17 12,5'
7,314SF
370
5,?80 5F
\-,r.u'".u.a.

L=2a.4(1)
371
5,4SSF
443
7,0705F
)
14' \
M2 12.5'P.U.E--\
6,612SF \
426
8 745 SF
,(t"'"t'

Page 120 ends

06/14/2022 Item No.9.
324
7,236SF
L-11.69'
320
5,162SF
I

12.5P.U.E.--l
437
5,955 SF
: 5.953 sF

12.5'P.U.E.
___ r__
R=272.04'
432
6,816SF
365
5,805SF
\-rr.u r.u.r.
366
6,gsF

REGENCY PARKWAY
2?
186
185
2? J69
SEE SHEET 712.5P.U.E.V
443 \
..------)
441 /A-tz.rp.u.e.
427 IRON OAK COU
(PRVATE ROAD)
RT

12.5', P.U.E.--J
I w-
184
r{1) 2? LOT E

5.7464C
P.U.E]E.V,A.
444 It
183
o
\

TOLL BROTHERS

AT FOLSOM RANCH
PHASE 1D
4J6 B.M.7
.t o
182
181
4 t
I
I
t-,
iF
tg
I
I
I
F
180

12.s P.U.E.(?)--1
u
E.
o
Yt
d
a
k
&I
LOT L

9.3684C

OPEN SPACE
i\
[\
gi
-t
60 PARCEL 28
aN 242111241374
& DN )O?111241369
22' 22'
n
(PARCEL 2A - 2J6 P.M. r0)
GREY HA]A/-K-

APPROXIMATE

CENTERLINEOF

ALDER CREEK
R=250.@'
L-16.32' 215.04 201.S'
R:228.m'
GREY
) __t _12.5 P.U.E.--]
I325 2', J53 J55 J56 J57 358
PUE
360352
/ :sr
L-i2.5'P.u.E.
11J 114
3 SEE SHEET 9 ., F|NAL MAP (PN 19-091)
o
Curye Table
Lenglh

23.36'
Deb
26"45'59.50.@'c1
Line Table
Lenglh
3001
26 1n
Bearing
N07"5552"€
N01"46',4aEL2
/

TOLL BROTHERS AT FOLSOM
RANCH PFIASE 1E
A SUBDIVISION OF LOT 1E OF THAT CERTAIN FIM! MP TITLEO'TOLL SROTHERS AT FOLSOM RANCH PHASE 18 & 1C" FILED FOR RECORO SEPEMBER 13, 2021 IN BOOK €1 OF MAPs. AT PAGE I, SACRAMENTO COUNfl RECORDS. BEING IN SECTPN 20, TOWNSHIP 9 NORTH, RANGE 8 gS, M@NT DIABLOMERI9IAN
CITY OF FOLSOM . SACRAMENTO COUNTY . CALIFORNIA0244080_: nACI(AY&s0mPS JUNE 2022 SHEET 8 OF 9SEE SHEET 2 FOR NOTES, BASIS OF BEARINGS, LEGEND AND REFERENCES SCALE: l"=4O'
EN@E$ PNN$ SWNqsm g0tlirse

Page 121 ends

06/14/2022 Item No.9.

EUUo zVE
I
341
3,840SF
340
4,300sF
360
4,320 SF
J61
339
43mSF
u2
3 520 SF
359
3,960 SF
362
125'P.U.E.
__l____
338
4,300 sF
358
3,960 SF
343
3,520SF
4,500 sF
-I

12.9 P.U-E
357
3,S0 SF
344
3,il0sF
36J
345
3,520 SF
336
4,5@ SF
e 356
5i 3,$0 SF
20r.50'
22 355
3,S0 SF
346

3.520 SF

12.5 P.U.E-
__t___
-r---

12.5 P.U.E.
335
4,500 sF
435
354

3.S0SF
347
3,520SF
334
4,5@SF
4J3

12.s P.U.E.
___t__

SEE SHEI
434
353
3,S0 SF
348
3,520SF
333
4,500 sF
349
3,520SF
3,S0SF
332
4,500 sF4,500 sF
?l!!8-L=16.32
R-228.@'
GREY
L=14.09'
351
5,290 SF
L-rz.s p.u.e.

I
L:17n8'
432
R=272.00
350
6,68SF
'E
330
7,848SF
Arz.s'p.u.E.
325
7,27ASF
326
7,145SF
327
5,S0SF
328
5,000sF
329
7,029SF

12.5'P.U.E.Y
3222611XOA)
1 1l
I
PARCEL 28
I
324
tz.s p.u.e.-_l
DN 202r 1 r24rJ70
& DN 2021il241J69
(PARCEL 2A - 236 P.M. 10)
6l
i/
22'
113
E/

APPROXME /

CENERIINEOF /

ALDERCREEK /
/ LOTL
/ 9.3S4C
/ OPEN SPACE
T
--o
6 -z
at.
o
O
o
D.C.R. PER--'----!/
DN 20191217159 /
/
/
/
/
/
/
22,
R L=7'M4O' L-23.2 EAGLE VIEW WAY
(PRVAE ROAD)
EAGLEf;
,
I

7.6711)
s
A.11'57'39 1=4E.43

12.s'P.U.E.(2)
v.
"1.Y,sh
1 12,5P,U.E.
/P.A.L/L.E.
2? 4
___r____
LoT 0 - 431 B.M. 1
ROCK ROAD &M(1)
.\ SACRAMENTO COUNTY
FUTURE 2OO' SOUIHEAST

CONNECTOR SEGMENT
03 RIGHT OF WAY
\- .\ FTNAL MAP (PN 19-091)

TOLL BROTHERS AT FOLSOM
RANCH PHASE 1E
A SUBDIVISION OF LOT 1E OF THAT CERTAIN FINAL MAP TTLED 'TOLL BRONERS AT FOLSOM RANCH PHASE 19 & 1C" FIIED FOR RECORD SEPEMBER 13. 2O2I IN BOOK €1 OF MAPS, AT PAGE 1, SACRAMENTO COUNfl RECORDS. BEING IN SECNON 20, TOWNSHIP 9 NORTH, RANGE 8 SST, MOUNT DIASLO MERIDhN
Clry OF FOLSOM . SACRAMENTO COUNTY . CALIFORNIA
..'ffi .T,g'L?&Hsd?,,sJAu,
JUNE 2022
SHEET 9 OF 9- - - .-sEE SHEET 2 FOR NOTES, BASIS OF BEARINGS, LEGEND AND REFERENCES #*,"=oo- nACnY&somPSil"Jff*,-:H!im.^,#ffi

Page 122 ends

06/14/2022 Item No.9.

ATTACHMENT 4
Toll Brothers at Folsom Ranch Phase lE Tentative
Subdivision Map

Page 123 ends

06/14/2022 Item No.9.
ft
iliilr!
t,
.lr"rL
ar.g

VICINITY MAII
^ ,.--.,-,,
i,,i
TENTANVE MAP INrcRMA1ION
ra,.*
I
lrrl
i
RANCII
\ '/
l-l,L I I
F.:r_;_fi
.zA, " *
NOTS
REOENC\' A7 EOLSO$ RANCil
PIIASE?
ti-Llu=Jt-,uiil-tffi
.@
l', r :t lr rr
'i
rts
'4.E .
; l'1"r:1.:

COVER SHEET
VESTINC TENTATIVE SUBDIVISION MAPL- L1
lr : J
# To11 Brothers at Folsom Ranch
Fotun, Calit nia Rrvid: F.!q, 5, 2o?0
nAcKAY&SonPs ttrliil
ll.r+ll
lN s"* ,A -*

Page 124 ends

06/14/2022 Item No.9.

ATTACHMENT 5
Table of Conditions of Approval for the Toll Brothers
at Folsom Ranch Phase lE Vesting Tentative
Subdivision Map

Page 125 ends

06/14/2022 Item No.9.

CoNDTTIONS OF APPROVAL FOR Tm TOLL BROTIIERS AT FOLSOM RANCH PROJECT (PN 19-091)

WEST OF EAST BIDWELL ROAD, NORTII OF WHITE ROCK ROAD, EAST OF OAK AVENUE PARKWAY, AND

SOUTH OF MANGINI PARKWAY
GPA. SPA. DA AMENDMENTS. SLVTSM. PD PERMIT. AIID INCLUSIONARY IIOIISING PLAN Condition
Satisfied?
Yes
Comments
The Community Development
Department has reviewed and
approved the improvement plans and
the final map for the project. The
approved improvement plans are in
substantial compliance with the
preliminary grading and drainage
plans, the preliminary site and utility
plans, the tree preservation/removal
plans, the preliminary landscape plans
and the community design guidelines.

The final map for this subdivision is in
substantial compliance with the
approved Vesting Tentative
Subdivision Map.

Responsible
Denartment

CD (PXE)
When
Required

G, I,M,B
Condition of Approval
Fin al D ev e lopment P I an s
The owner/applicant shall submit final site development plans to the Community Development Department that shall substantially conform to the exhibits referenced below:
l. General Plan/Specific Plan Amendment Exhibit, dated larlu,dry 24,2020

2. Illustrative Master Plan Exhibit, dated January 24,2020

3. Small-Lot Vesting Tentative Subdivision Maps, dated February 5,2020

4. Backbone Infrastructure Exhibit, dated February 5,2020

5. Conceptual Phasing Exhibit, daled January 24, 2020

6. Prelimrnary Grading and Drainage Plan, dated Februwy 5,2020

7. Preliminary Utility Plan, dated February 5,2020

8. Preliminary Tree Preservation/Removal Plan, dated February 5,2020

9. Preliminary Landscape Plan and Details, dated January 24,2020 I 0. Wall and Fence Exhibit and Details, dated January 24, 2020 I l. Local Road Section Exhibit, dated January 24,2020
12- Trail System Modification Exhibit, dated January 24,2020

13. Walkability Exhibit, dated Janaary 24,2020

14. Trailhead and Signage Exhibit, dated Janmry 24,2020 1 5. Dog Park Exlribit, dated.IaNary 24,2020

16. Model Home Complex Exhibit, dated January 24,2020

17. Product Mix Exhibit, dated Jansary 24,2020

18. Streetscene Exhibit, dated August 30,2019

19. Building Elevations and FloorPlans, dated August30, 2019

20. Residential Design Details, dated August 30. 2019
2 1. Color and Materials Board, dated August 30, 201 9

22. Inclusionary Housing Plan, dated March 7,2019
The General PIan Amendment, Specific Plan Amendment, Development Agreement Amendments, Planned Development Permit, Design Review, and Inclusionary Housing Plan are approved for the development of a 804-unit single-family residentral subdivrsion (Toll Brothers at Folsom Ranch).

Implementation ofthe project shall be consistent with the above referenced items and these conditions of aooroval.

Mitigation
Measure#
1 Resolution No. 1 0670
Page I of '140

Page 126 ends

06/14/2022 Item No.9.

CONDITIONS OF A?PROVAL FOR THE TOLL BROTEERS AT FOLSOM RANCH PROJECT (PN 19-091) WEST OF EASTBIDWELL ROAD, NORTH OFWHITEROCKROAD, EAST OF OAK AVEIIT"IEPARKWAY, ANI) SOUTH OF MANGIhII PARI(WAY
GPA. SPA. DA AMENDMENTS, SLVTSM, PD PERNIIT, AI{D INCLUSTONARY HOUSING PLAN Condition
Satisfied?
Yes
Yes
Yes
Yes
Comments
Improvement plans for East Bidwell
Street, Mangini Parkway, Regency
Parkway and the subdivision have
been approved by the City and these
improvements are currently under
constructron.

The small-lot vesting tentative
subdivision map for the Toll Brothers
at Folsom Ranch Phase lE, subdivision
was approved by the City Council on
March 10, 2020.

The smallJot vesting tentative
subdivision map for the Toll Brothers
at Folsom Ranch Phase I E subdivision
was approved by the City Council on
March 10.2020.

The Community Development
Department has reviewed and
approved the improvement plans for
the both the required on-site and off-
site improvements for the Phase lE
subdivision.

Responsible
Deoartment

CD (PXE)
cD (P)
cD (E)

CD (PXE)(B)

PW, PR, FD,
PT)
When
Required
G, I
M
M
OG
Condition of Approval
PIan Submittal
All civil engineering, improvement, and landscape and irrigation plans, shall be submitted to the Community Development Department lbr review and approval to ensure conformance with this approval and with relevant codes, policies, standards and other requirements ofthe City of Folsom.

Validity
This approval of the Small-Lot Vesting Tentative Subdivision Map shall be valid for a period of twenty four months pursuant to Section 16.16. I l0A of the Folsom Municipal Code and the Subdivision Map Act. The term of the approved Inclusionary Housing Agreement shall track the term of the Small-Lot Vesting Tentative Subdivision Map, as may be extended from time to time pusuant to Section 16.16.110.A and 16.16.120 of the Folsom Municipal Code and the Subdivision Man Act.

FMC Compliance
The Small-Lot Final Map shall comply with the Folsom Municipal Code and the Subdivision Map Act.

Development Rights
The approval of this Small-Lot Vesting Tentative Subdivrsron Map conveys the right to develop. As noted in these conditions of approval for the Small-Lot Vesting Tentative Subdivision Map, the City has identified improvements necessary to develop the subject parcels. These improvements include on and off-site roadways, water, sewer, storm drainage, landscaping. sound-walls, and other improvements.

Mitigation
Measure#

2. J

4. 5
Resolution No. 10670

Page 2 of 140 ends
Page 127 ends

06/14/2022 Item No.9.

CoNDTTIONS OF APPROVAL FOR Tm TOLL BROTEERS AT FOLSOM RANCA PROJECT (PN 19-091)

WEST OFEASTBTDWELL ROAD,NORTH OFWHITEROCKROAD, EAST OF OAKAVENTIE PARKWAY, AND

SOUTE OF' MANGINI PARKWAY
GPA. SPA. DA AMENDMENTS. SLVTSM. PD PERMIT. AIID INCLUSIONARY IIOUSING PLAN Condition
Satisfied?
Yes
Yes
Comments
The final map for the Phase lE
subdivision includes all required public
right-of-way and public utility
easements necessary to serve all lots in
the subdivision. The public right-of-
way and public utility easements are
shown on the final map. The
residential streets serving the lots in
this subdivision are private and are
shown on the final map.

The required street names are shown
on the linal map lbr the subdivision.

Responsible
Denartment
cD (E)(P)
cD (EXP)
When
Reouired
M
M
Condition of Approval
Public Right of Way Dedication
As provided for in the First Amended and Restated Development Agreement (ARDA) and the Amendments No. I and 2 thereto, and any approved amendments thereafter, the owner/applicant shall dedicate all public rights-of-way and corresponding public utility easements such that public access is provided to each and every lot within the traditional home portion ofthe Toll Brothers at Folsom Ranch project as shown on the Small-Lot Vesting Tentative Subdivision Map (Lots l-214). In addition, public utility easements shall be provided for public utilities within private streets to the satisfaction of the Community Development Department.

Street Names
The street names identified below shall be used for the Final Small-Lot Maps:

Avazedo, Black Sage, Blue Oak, Blue Sky, Boulder Creek, Bridgeview, Brookview, Clearview, Clubhouse, Cold Creek, Copperwood, Coyote Ridge, Creekwood, Cresfview, Dalea, Dawn Light, Deer Park, Eagle View, Edgewood, Emerald Glen, Fallen Leaf, Fountain Heights, Fox Hollow, Gateway, Glenbrook, Glenridge, Goldenrod, Granite Point, Grey Hawk, Gully, Heather Glen, Heritage Oaks, Iron Oak, Japanese Maple, Knollbrook, Lone Tree, Longview, Manzanita, Maple, Meadow Crest, Midway, Monument, Nettle, Oak Bridge, Oakridge, Olive Orchard, Pacific Wren, Panoram4 Paradise, Patin4 Pinyon Pine, Quail Run, Rainbow Ridge, Ravine, Redtail, Regency Parkway, Rrmrock, Robinwood, Rock Ridge, Rocky Creek, Rocky Point, Sagewood, Salvia, Scenic, Skymeadow, Skyway, Springcreek, Starling, Sundown, Sunny Oaks, Sunnyview, Sweetrvater, Timber, Upland, Vale, Valley View, White Cedar, Wildwood.

Mitigation
Measure#
6 7
Resolution No. 10670
Page3ofl40

Page 128 ends

06/14/2022 Item No.9.

CONDITIONS OF APPROVAL FORTM TOLL BROTEERS AT RANCH PROJECT (PN 19-091)

WEST OF EAST BIDWELL ROAD, NORTH OF WHITE ROCK ROAD, EAST OF OAK AVENTM PARKWAY, AND

SOUTH OF MANGIM PARKWAY
GPA, SPA, DA AMENDMENTS, SLVTSM,PDPERMIT, AI\ID rN.'f TTCINNAITV HOTISING PLAN Condition
Satisfied?
Yes
Yes
Comments
The City standard subdivision
improvement agreement includes
language that satisties this condition.

The subdivision improvement
agreement will be executed by the City
Manager upon approval by the City
Council.

The owner/applicant complied with al1
applicable mitigation measures fiom
the FPASP FEIR/EIS and other
approved environmental documents
prior to the issuance of a grading
permit. Additionally. construction
inspection and monitoring is being
conducted throughout construction by
the City and/or its Consultants.

Responsible
Deoartment

CD (PXEXB)

PW, PR, FD,
PD
CD
When
Required
OG
OG
Condition of Approval
Indemnity for City
The owner/applicant shall protect, defend, indemnifli, and hold harmless the City and its agents olficers and employees from any claim, action or proceeding against the City or its agents, officers or employees to attack, set aside, void, or annul any approval by the City or any ofits agencies, departments, commissions, agents, officers, employees, or legislative body concerning the project, which claim, action or proceedlng is brought within the time period provided therefore tn Government Code Section 66499.37 or other applicable statutes of limitation. The City will promptly notifu the owner/applicant of any such claim, action or proceeding, and will cooperate fu1ly in the defense. If the City should fail to cooperate fully in the defense, the owner owner/applicant shall not thereafter be responsible to defend, indemniff and hold harmless the City or its agents, officers, and employees, pursuant to this condition.

The City may, within its unlimited discretion, participate in the defense of any such claim, action or proceeding ifboth ofthe following occur:
o
The City bears its own attomey's fees and costs; and
The City defends the claim, action or proceeding in good faith The owner/applicant shall not be required to pay or perform any settlement ofsuch claim, action or proceeding unless the settlement is approved by the owner/applicant. The owner/applicant's obligations under this condition shall apply regardless ofwhether a Final Map is ultimately recorded with respect to this project.

Small-Lot Vesting Tentative Subdivision Map
The Small-Lot Vesting Tentative Subdivision map is expressly conditioned upon compliance with all environmental mitigation measures identifled in the Folsom Plan Area Specific PIan (FEIR/EIS) as amended by the Toll Brothers at Folsom Ranch CEQA Addendum dated February-2020 (Attachment 31 to the stafTreport)
Mitigation
Measure#

8. I
Resolution No. 10670
Page4ofl40

Page 129 ends

06/14/2022 Item No.9.

CONDITIONS OF APPROVAL FOR TEE TOLL BROTHERS AT FOLSOM RANCH PROJECT (PN T9-091)

WEST OFEASTBIDWELL ROAD, NORTII OF'WHITEROCKROAD, EAST OT OAKAI'ENTIE PARKWAY,ANI)

SOUTII OF MANGINI PARI(WAY
GPA. SPA. DA AMEI\DMENTS. SLVTSM, PD PERMIT, AND INCLUSIONARY HOUSING PLATI Condition
Satisfied?
Yes
Yes
Comments
The Community Development
Department has reviewed the
subdivision and verified that it is in
compliance u'ith Amendment No. I
and No. 2 to the First Amended and
Restated Tier 1 Development
Agreement.

The owner/applicant has funded and
participated in a MMRP reporting
program performed by the City's
consultant (Helix) and/or City staff.

Responsible
Department
cD (E)
cD (P)
When
Required
M
OG
Condition of Approval
ARDA and Amendments
The owner/applicant shall comply with all provisions of Amendments No. 1 and 2 to the First Amended and Restated Tier 1 Development Agreement and any approved amendments thereafter by and between the City and the owner/applicant ofthe project including but not limited to Amendment No. 2 to the First Amended and Restated Tier I Development Agreement by and between the City of Folsom and Easton Valley Holdings, LLC, Amendment No 2 to the First Amended and Restated Tier I Development Agreement by and between the City of Folsom and West Scott Road, LLClToll West Coast, LLC, Amendment No. 2 to the First Amended and Restated Tier 1 Development Agreement by and betrveen the City of Folsom and Oak Avenue Holdings, LLC, and Amendment No. 3 to the First Amended and Restated Tier I Development Agreement by and between the City of Folsom and Folsom Real Estate South. LLClToll West Coast. LLC.

Miligation Monitoring
The owner/applicant shall participate in a mitigation monitoring and reporting program pursuanttoCityCouncil ResolutionNo.2634andPublicResourcesCode2l08l.6. The mitigation monitoring and reporting measures identified in the Folsom Plan fuea Specific Plan FEIR/EIS and the Toll Brothers at Folsom Ranch Addendum to the FPASP EIR/EIS have been incorporated into these conditions ofapproval in order to mitigate or avoid significant effects on the environment. These mitigation monitoring and reporting measures are identified in the mitigation measure column. Applicant shall fund on a Time and Materials basis all mitigation monitoring (e.g., staff and consultant time).

Mitigation
Measure#
t0
11 Resolution No. 10670
Page5ofl40

Page 130 ends

06/14/2022 Item No.9.

CONDITIONS OF A}PROVAL FOR THE TOLL BROTHERS AT FOLSOM RANCH PROJECT (PN 19-091)

WESTOF'EASTBMWELL ROAD, NORTII OTWHITEROCKROAD, EAST OF'OAKAVENUE PARKWAY, AND

SOUTH OF MANGIM PARKWAY

GPA, SPA, DA AMENDMENTS, SLVTSM, PD PERMIT, AND INCLUSIONARY EOUSING PLAN Condition
Satisfied?
Yes
Yes
Yes
Comments
The owner/applicant provided onsite
security during construction and has
incorporated line of sight guidelines
into Iandscaping plans at intersections
which have been reviewed and
approved by the City.

The owner/applicant has paid all
curent taxes and fees associated with
this subdivision.

The owner/applicant has paid all taxes
and fees associated with this
subdivision and filed a tar segregation
request for applicable taxes.

Responsible
Department

POLICE/SECURJTY REQUIREMENT
PD

DEVELOPMENT COSTS AND FEE REQUIREMENTS
cD (PXE)
cD (E)
When
Required
G,I, B
M
M
Condition of Approval
The owner/applicant shall consult with the Police Department in order to incorporate all reasonable crime prevention measures. The following security/safety measures shall be considered.
a A security guard on-duty at all times at the site or a six-foot security fence shall be constructed around the perimeter of construction areas.

Security measures for the safety ofall construction equipment and unit appliances.a Landscaping shall not cover exterior doors or windows, block line-otsight at intersections or screen overhead lighting.

Taxes and Fees
The owner/applicant shall pay all applicable taxes, fees and charges for the project at the rate and amount required by the Public Facilities Financing Plan and Amendment No. I to the Amended and Restated Tier I Develooment Asreement.

Assessments
Ifapplicable, the owner/applicant shall pay offany existing assessments against the property, or file necessary segregation request and pay applicable fees- Mitigation
Measures
#

12. l3

14. Resolution No. 10670
Page6ofl40

Page 131 ends

06/14/2022 Item No.9.

CoNDTTIONS OF APPROVAL ['OR TlrF TOLL BROTHERS AT FOLSOM RANCH PROJECT (PN 19-09r)

WEST OF EASTBIDWELL ROAD, NORTIIOFWHITEROCKROAD, EAST OF'OAKAVENUE PARKWAY,AND

SOUTH OF MANGINI PARI(WAY
GPA" SPA. DA AMENDMENTS. SLVTSM, PD PERMIT, AND INCLUSIONARY HOUSING PLAN Condition
Satisfied?
Condition
will be
satisfied
prior to
issuance ofa
building
permit.

Yes
Comments
The Owner/Applicant shall pay all
required City fees and Folsom Plan
Area wide fees prior to issuance of
building permits.

The City has not yet utilized any
outside services for any type oflegal
issues for this subdivision. Ifat any
time during the development of this
subdivision, any outside legal services
were necessary, the owner/applicant
would be required to comply with this
condition.

Responsible
Denartment
cD (P), PW,
PK

CD (PXE)
When
Required
B
OG
Condition of Approval
FPASP Development Impact Fees
The owner/applicant shall be subject to all Folsom Plan Area Specific Plan Area development impact fbes in place at the time ofapproval or subsequently adopted consistent with the Public Facilities Financing Plan (PFFP), Development Agreement and amendments thereto, unless exempt by previous agreement. The owner/applicant shall be subject to all applicable Folsom Plan Area plan-wide development impact fees in effect at such time that a building permit is issued. These fbes may include, but are not limited to, the Folsom Plan Area Speoific PIan Fee, Specific Plan Infiastructure Fee (SPIF), Solid Waste Fee, Corporation Yard Fee, Transportation Management Fee, Transit Fee, Highu'ay 50 Interchange Fee, General Park Equipment Fee, Housing Trust Fee, etc.

Any protest to such for all t'ees, dedications, reservations or other exactions imposed on this project will begin on the date of final approval (March I 0, 2020). or otherwise shall be governed by the terms of Amendments No. I and 2 to ARDA. The fees shall be calculated at the t-ee rate set lbrth in the PFFP and the ARDA.

Legal Counsel
The City, at its sole discretion, may utilize the services ofoutside legal counsel to assist in the implementatron of this project, including, but not limited to, drafting, reviewing and/or revising agreements and/or other documentation lbr the project. If the City utilizes the services of such outside legal counsel, the City shall provide notice to the owner/applicant ofthe outside counsel selected, the scope ofwork and hourly rates, and the owner/applicant shall reimburse the City for all outside legal fees and costs incurred and documented by the City for such services. The owner/applicant may be required, at the sole discretion of the City Attomey, to submit a deposit to the City fbr these services prior to initiation of the services. The owner/applicant shall be responsible for reimbursement to the City for the services regardless ofwhether a deposit is required.

Mitigation
Measures
#

15. 16.

Resolution No. 10670

Page 7 of 140 ends
Page 132 ends

06/14/2022 Item No.9.

CONDITIONS OF FOR THE TOLL BROTmRS AT FOLSOM RANCH PROJECT (PN 19-091)

WEST OF EAST BIDWELL ROAD, NORTIIOFWHITE ROCKROAD,EAST OF OAKAVENUE PARI(WAY, AND

SOUTH OF MANGIM PARI(WAY
GPA. SPA, DA AMEIIDMENTS, SLVTSM, PD PERMIT, AND INCLUSIONARY HOUSING PLAI\ Condition
Satisfied?
Yes
Yes
Yes
Comments
The City has provided notice to the
owner/applicant fbr various
Consultants performing services for
the development of this subdivision.

The City has collected deposits in
advance of such work for construction
inspection related services for this
subdivision.

The Community Development
Department has verified that the
proposed walls and fences for the
subdivision are in compliance with the
Folsom Ranch Central Design
Guidelines.

The owner/applicant is currently
constructing the on-site and off'-site
public and private improvements for
the Phase lE subdivision. The public
and private improvements will serve
all ofthe lots in the subdivision. The
Phase 1E subdivision is a phased
portion ofthe 593 age-restricted
dwelling units whrch are included in
the approved Regency Phase 1 vesting
tentative subdivision map. The
tentative subdivision map for the
Phase 2 portion ofthe age-restricted
Regency project has been approved by
the CiW Council.

Responsible
Deoartment

CD (PXE)

GRADING PERMIT REQIIIREMENTS
cD (PXE)
cD(E), PW
FD
When
Reouired

G, I,M,B
G,I, B
B
Condition of Approval
Consultant Sewices
Ifthe City utilizes the services ofconsultants to prepare special studres or provide specialized design review or inspection services for the project, the City shall provide notice to the owner/applicant ofthe outside consultant selected, the scope ofwork and hourly rates, and the owner/applicant shall reimburse the City for actual costs incurred and documented in utilizing these services, including administrative costs for City personnel. A deposit for these services shall be provided prior to initiating review of the Grading Plan, Final Map, improvement plans, or besinnins insnection. whichever is aoolicable.

Walls/Fences/Gates
The final location, design, height, materials, and colors ofthe walls, fences, and gates shall consistent with the submitted Wall and Fence Exhibit and Details, dated January 24,2020 subject to review and approval by the Community Development Department to ensure consistency with the Folsom Ranch Central District Design Guidelines.

Ro adw ay I mp rovement Phasing
The owner/applicant shall construct the following improvements as shown on the Small-Lot Vesting Tentative Subdivision Map with each applicable phase. Roadways shall be to the ultimate horizontal and vertical alignment unless otherwise noted.

For the purposes ofthese conditions, phasing ofthe prqect is defined per Figure ES-6 ofthe Transportation Impact Analysis dated November 20,2019 (Attachment 31 to the stafTreport) and the tbllowing:

Phase 1 consists ofthe first 305 age-restricted dwelling units within Regency Phase l, all located on the eastem portion ofthe Project site and labeled as "2021" on Figure ES-6 of the Transportation Impact Analysis dated November 20, 2019 (Attachment 3l to the staff report). Phase 1 also includes an additional 45 model home units that would be used for sales and marketing purposes initially. Conditions ofapproval for Phase 1 shall be met before issuance ofthe first buildine permit.
a
Mitigation
Measures
#
17 18

19. Resolution No. 10670
Page8ofl40

Page 133 ends

06/14/2022 Item No.9.

CoNDITIONS OF APPROVAL rOR TffE TOLL BROTEERS AT FOLSOM RANCH PROJECT (PN 19-091)

WEST OF EASTBIDWELL ROAD,NORTH OT'WHITEROCKROAD,EAST OF'OAKAVENTTE PARKWAY, AND

SOUTH OT' MANGINI PARKWAY
GPA. SPA. DA AMEI\DMENTS. SLVTSM. PD PERMIT. AND INCLUSIONARY HOUSING PLAN Condition
Satisfied?
CommentsResponsible
I)enartment
When
Required
Condition of Approval
a Phase 2 consists ofthe next 377 dwelling units (240 age-restricted dwelling units located within Regency Phase I on the eastern portion ofthe Project site, and 137 Traditional Subdivision units located on the western portion ofthe project site.) These units are labeled as"2022" on Figure ES-6 ofthe Transportation Impact Analysis dated November 20,2019 (Attachment 3 I to the staffreport). Conditions ofapproval for Phase 2 shall be met before issuance of the 306th Regency Phase I building permit (excludes 45 model home units) or the first building permit for the Traditional Subdivision within the project site. a Phase 3 consists of the remaining 543 dwelling units (466 age-restricted dwelling units within Regency Phase I and 2 phts 77 Traditional Subdivision units) These units are labeled as"2023" and2024 on Figure ES-6 ofthe Transportation Impact Analysis dated November 20,2019 (Attachment 3 I to the staffreport). Conditions of approval for Phase 3 shall be met before issuance ofthe 546e age restricted building permit fbr Regency Phase liPhase 2 or the 138th building permit for the Traditional Subdivision within the Project site.

The following conditions defined the roadway improvements which shall be installed for each as described above.

Mitigation
Measures
#
Resolution No. 1 0670

Page 9 of 140 ends
Page 134 ends

06/14/2022 Item No.9.

The
condition
will be
satisfied
prior to
issuance ofa
building
permit.

The Community Development
Department has reviewed and
approved the improvement plans for
the subdivision. The owner/applicant
is currently constructing the on-site
and off-site public and private
improvements for the Phase lE
subdivision. The public and private
improvements will serve all of the lots
in the subdivision. The Phase 1E
subdivision is a phased portion of the
593 age-reshicted dwelling units
which are included in the approved
Regency Phase I vesting tentative
subdivision map. The tentative
subdivision map Phase 2 portion ofthe
age-restricted Regency project has
been approved by the City Council.

The vesting tentative subdivision map
for Phase 3 was approved by the City
Council but has not yet moved forward
into development at this time.
cD (E), PW,
FDB
Phasing of Roadways
Roadway construction shall be phased as described in the Transportation Impact Analysis and as shown on Figure ES-6 of the Transportation Impact Analysis dated November 20,2019 (Attachment 3 I to the staffreport). Changes in the timing and/or progression of construction of homes may result in a change in the timing and/or sequencing of roadway construction subject to review and approval by the Community Development Department.

Phase I
r Construct Mangini Parkway from East Bidwell Street to Driveway #4 located on the south side of Mangini Parkway as a twoJane roadway prior to issuance of the first building permit in Regency Phase L
r Construct Regency Parkway as a twoJane roadway from East Bidwell Street to Street F. o Construct Mangini Parkway,/Driveway #4 intersection, East Bidwell Street/Regency Parkway intersection, and intemal project roads as required to access to new homes.

Phase 2
o Construct Mangini Parkway from Driveway #4 to Oak Avenue Parkway as a two-lane roadway prior to issuance of the first Traditional Subdivision building permit within the project.
o Construct Oak Avenue Parkway from Mangini Parkway to Driveway #l prior to issuance of the first Traditional Subdivision building permit within the prolect. . Construct Oak Avenue Parkway from Driveway #l to White Rock Road as an EVA access prior to issuance of the first Traditional Subdivision building permit within the Project. . Construct Oak Avenue Parkway/Driveway #l intersection, Mangini Parkway Driveway #2 intersection, Mangini Parkway Driveway #4 intersection, and internal project roads as required to access new homes.
o Construct Regency Parkway as a twolane roadway from Street F to planned bridge over creek at the westem ofthe Phase 2 active adult homes.

Phase 3
. Construct Oak Avenue Parkway from Driveway #1 to White Rock Road as a fwo-lane roadway prior to issuance of the l38th Traditional Subdivision building permit within the project.

20. Resolution No. 10670
Page l0of140

Page 135 ends

06/14/2022 Item No.9.

Condition
will he
satisfied
prior to
issuance of
the first
building
permit.

Condition
Satisfied?
Condition
will be
satisfied
prior to
issuance of
the first
building
oermit.

The Community Development
Department has reviewed and
approved the public and private
improvement plans for the subdivision
and verified that these improvements
are consistent with the approved
Transportation Impact Study. These
required improvements are included in
the approved plans for this roadway
section and are currently under
construction.

Comments
The Community Development
Deparhnent has reviewed and
approved the public and private
improvement plans for the subdivision
and verified that these improvements
are consistent with the approved
Transportation lmpact Study.
cD (E), PW,
FD
cD (E), Pw,
FD
Responsible
Department
B
B
When
Required
Construct Regency Parkway from prior terminus to Mangini Parkway prior to issuance of the 546th Regency Phase I building permit within the project.

All driveway intersections and the Oak Avenue Parkway/Mangini Parkway intersection shall be constructed as the corresponding portions ofthose roads are built. a
Phasing of Improvements to Specific Intercections
Improvements to specrfic intersections identified in the November 20,2019, Transportation Impact Study (Attachment 31 to staff report) shall be constructed as follows in Condition Nos.

Mangini Parkway (Segment I)
Construct Mangini Parkway from East Bidwell Street westerly to Driveway #4 ("Street C") as a hvolane roadway prior to issuance of the first Regency Phase 1 build-ing permit.

Timing: Prior to issuance of the first Regency Phase I building permit.

Condition of ApprovalMitigation
Measures

22. WEST OF EAST BIDWELL ROAD, NORTE OFWEITEROCKROAD, EAST OF OAKAVENIIE PARKlryAY,AND

SOUTE OF MANGIM PARI(WAY

AND INCLPDDASPGP
CONDITIONS OF APPROVALFORTEE TOLLBROTMRS AT PROJECT (PN 19{91) PLAI\SL
#
2l
Resolution No. 10670

Page 11 ends
Page 136 ends

06/14/2022 Item No.9.

CONDITIONS OF AIPROVAL FOR THE TOLL BROTEERS AT FOLSOM RANCH PROJECT (pN 19-09r)

WEST OFEASTBIDWELL ROAD, NORTEOFWHITEROCKROAD, EAST OF'OAKAITENUE PARKWAY,AND

SOUTE OF MANGIM PARI(WAY
GPA, SPA, DA AMEI\IDMENTS, SLVTSM, PD PERMIT, AND INCLUSIONARY HOUSING PLAN Condition
Satisfied?
Condition
will be
satisfied
prior to
issuance of
the first
building
permit in
Phase 3
Condition
will be
satisfied
prior to
issuance of
the first
building
permit.

Condition
will be
satisfied
prior to
issuance of
the 306th
building
permit.

Comments
This condition will be satisfied prior to
issuance of the first building permit in
the Phase 3 portion (Traditional Lots)
ofthe Toll Brothers at Folsom Ranch
The Community Development
Department has reviewed
and.approved the public and private
improvement plans for the subdivision
and verified that these improvements
are consistent with the approved
Transportation Impact Study These
required improvements are included in
the approved plans for this roadway
section and are currently under
construction.

This condition will be satisfied prior to
issuance of the 3061h building permit in
the Toll Brothers at Folsom Ranch
Regency project.

Responsible
Department
cD (E), Pw,
FD
cD (E), PW
FI)
cD (E), Pw,
FD
When
Required
B
B
.B
Condition of Approval
Mangini Parkway (Segment 2)
Construct Mangini Parkway fiom Driveway #4 ("Street C") to Oak Avenue Parkway as a two- lane roadway prior to issuance of the first Traditional Subdivision building permit within the project.

Timing: Prior to issuance of the first Traditional Subdivision building permit.

Regency Parkway (Segment I)
Construct Regency Parkway as a twolane roadway liom East Bidwell Street to Street F Timing: Prior to issuance of the first Regency Phase I building permit.

Regency Parkway (Segment 2)
Construct Regency Parkway as a two-lane roadway from Street F to the planned bridge over creek at the western edge ofthe Regency Phase 1 Small-Lot Vesting Tentative Subdivision Map.

Timing: Prior to issuance of 3066 Regency Phase I building permit.

Mitigation
Measures
#
23 24.
25 Resolution No 10670
Page12ofl40

Page 137 ends

06/14/2022 Item No.9.

CONDITIONS OF APPROVAL FOR IIIE TOLL BROTMRS AT FOLSOM RANCH PROJECT (PN 19491)

WEST OF EASTBIDWELL ROAD, NORTII OFWHITEROCKROAD, EAST OF OAKAYENTIE PARKWAY, AND

SOIJ'TH OF MANGIM PARI(WAY
GPA. SPA, DA AMENDMENTS, SLVTSM, PD PERMIT, AND INCLUSIONARY IIOUSING PLAII Condition
Satisfied?
This
condition
will be
satisfied
prior to
issuance of
the 546s
building
permit
Condition
will be
satisfied
prior to
issuance of
the first
building
permit in
Phase 3
Condition
will be
satisfied
prior to
issuance of
the first
building
permit in
Phase 3
Comments
This condition will be satisfied prior to
issuance of the 5461h burlding permit in
the Phase 2 portion ofthe Toll
Brothers at Folsom Ranch Regency
project. The Phase 1 portion ofthe
Regency project consists of 593
dwelling units, The VTSM for the
Phase 2 portion ofthe Regency project
has been approved by the City
Council.

This condition will be satisfied with
the future development of the Phase 3
portion ofthe Toll Brothers at Folsom
Ranch project (Traditional
Subdivision)
This condition will be satisfied with
the future development of the Phase 3
portion ofthe Toll Brothers at Folsom
Ranch project (Traditional
Subdivision)
Responsible
Department
cD (E), PW,
FD
cD (E), PW
FD
cD (E), PW,
FD
When
Required
B
B
B
Condition of Approval
Regency Parkway (Segment 3)
Construct Regency Parkway as a twolane roadway liom the eastern edge ofthe planned bridge over the creek bisecting the project site to Mangini Parkway.

Timing: Prior to issuance of the first Regency Phase 2 building permit (546th overall Regency Phase l/2 building permit excluding the 45 model home building permits).

Oak Avenue Parkway (Segment 1)
Construct Oak Avenue Parkway as a twolane roadway from Mangini Parkway to Driveway I Timing: Prior to issuance of the first Traditional Subdivision building permit.

Oak Avenue Parkway (Segment 2)
Construct Oak Avenue Parkway as an EVA from Driveway 1 to White Rock Road.

Timing: Prior to issuance of the first Traditional Subdivision building petmit.

Mitigation
Measures
#

26. 27
28 Resolution No. 10670
Pagel3of'140

Page 138 ends

06/14/2022 Item No.9.

CoNDITIONS OF APPROVAI FOR Tm TOLL BROTmRS AT FOLSOM RANCH PROJECT (PN 19-09r) WEST OF EAST BIDWELL ROAD, NORTII OF' WHITf, ROCK ROAD, EAST OF OAK AVENIE PARI(WAY, ANI)

SOUTE OF' MANGINI PARI(WAY
GPA. SPA. DAAMENDMENTS. SLVTSM. PDPERMIT. AND INCLUSIONARYHOUSING PLAN Condition
Satisfied?
Condition
will be
satisfied
prior to
issuance of
the 138th
building
permit in
Phase 3
Condition
will be
satisfied
prior to
issuance of
the first
building
permit in
Phase 3
Comments
This condition will be satisfied with
the futwe development of the Phase 3
portion ofthe Toll Brothers at Folsom
Ranch project (Traditional
Subdivision).

This condition will be satisfied with
the futwe development of the Phase 3
portron ofthe Toll Brothers at Folsom
Ranch project (Traditional
Subdivision).

Responsible
Department
cD (E), PW,
FD
cD (E), Pw,
FD
When
Required
B
B
Condition of Approval
Oak Avenue Parkway (Segment 2)
Construct Oak Avenue Parkway as a twoJane roadway from Driveway I to White Rock Road.

Timing: Prior to issuance of the l38rh Traditional Subdivision building permit.

Oak Avenue Parkway/Driveway I (Stage I)
Construct Driveway as shown in (Figure 43 of the November 20,2019 Transportation Impact Study):

Northbound: Oak Ave Parkway shall be barricaded south ofDriveway I and configured as an EVA;
Southbound: one shared through-left lane;
Westbound: one shared lane;
Control: side-street-stop-control.

Timing: Prior to issuance of t'rrst Traditional Subdivision building permit.

Mitigation
Measures
#
29 30.

Resolution No. 10670
Page l4 of 140

Page 139 ends

06/14/2022 Item No.9.

CoNDITTONS OF AIPROVAL FOR Tm TOLL BROTmRS AT FOLSOM RANCH PROJECT (PN 19-091) WEST OF EASTBIDWELL ROAD, NORTE OFWHITEROCKROAD,EAST OF OAKA1IENTIE PARKWAY, AND

SOUTH OF MANGIM PARKWAY
GPA, SPA, DA AMENDMENTS, SLVTSM, PD PERMIT, A}\D TNflI TTSIrINAR\/ ITNITSING PT,AN Condition
Satisfied?
Condition
will be
satisfied
prior to
issuance of
the 138th
building
permit in
Phase 3
Condition
will be
satisfied
prior to
issuance of
the first
building
permit in
Phase 3
Comments
This condition will be satisfied with
the future development of the Phase 3
portion ofthe Toll Brothers at Folsom
Ranch project (Traditional
Subdivision).

This condition will be satisfied with
the future development ofthe Phase 3
portion ofthe Toll Brothers at Folsom
Ranch project (Traditional
Subdivision).

Responsible
Department
cD (E), PW,
FD
cD (E), PW,
FD
When
Required
B
B
Condition of Approval
Oak Avenue Parkway/Driveway I (Stage 2)
Construct driveway as shown in (Figure 44 of the November 20,2019 Transportation Impact Study):
. Northbound: one shared through-right lane with a 150' right turn taper; . Southbound: one shared throughJeft lane;
. Westbound: one shared lane;
r Control: side-street-stop-control.

Timing: Prior to issuance of l38th Traditional Subdivision building permit.

Oak Avenue Parkway/Driveway I (Cumulative Right-of-Way) Applicant shall dedicate righrof-way to City of Folsom for fuhle construction of the ultimate Driveway 1 intersection (Figure 45 of the November 20,2019 Transportation Impact Study):
o Northbound: one left-turn lane with 150' pocket plus 60'taper, one through, and one shared through-right lane with a I 50' right turn taper;
. Southbound: one left-turn lane with 150'pocket plus 60'taper, one through, and one shared through-right lane with a 150 right turn taper;
o Westbound: one shared lane;
r Eastbound: one shared lane;
o Control: side-street-stop-control.

Timing: Prior to issuance of first Traditional Subdivision building permit.

Mitigation
Measures
#
3l

32. Resolution No. 10670
Page I5of140

Page 140 ends

06/14/2022 Item No.9.

CONDITIONS OF APPROVAI FOR THE TOLL BROTITFRS AT FOLSOM RANCH PROJECT (PN 19-O9T)

WEST OFEASTBIDWELL ROAD, NORTEOFWHITE ROCKROAD,EAST OF OAK AVENTM PARKWAY,AND

SOUTE OF MANGIM PARKWAY
GPA. SPA. DAAMENDMENTS. SLWSM. PDPERMIT. AND INCLUSIONARYHOUSING PLAII Condition
Satisfied?
Condition
will be
satisfied
prior to
issuance of
the first
building
permit in
Phase 3
This
condition
will be
satisfied
prior to
issuance of
the 546th
building
permit in
Phase 2
Comments
This condition will be satisfied with
the luture development ofthe Phase 3
portion ofthe Toll Brothers at Folsom
Ranch project (Traditional
Subdivision).

This condition will be satisfied prior to
issuance of the 546'h building permit in
the Phase 2 portion ofthe Toll
Brothers at Folsom Ranch Regency
project. The Phase 1 portion ofthe
Regency project consists of593
dwelling units, The VTSM for the
Phase 2 portion ofthe Regency project
has been approved by the City
Council.

Responsible
Department
cD (E), PW,
FD
cD (E), PW
FD
When
Required
B
B
Condition of Approval
Mangini Par kw ay/Drivew ay 2
Construct driveway as shown in (Figure 46 of the November 20,2019 Transportation Impact Study):
. Northbound: one shared lane;
o Westbound: one through lane and one left turn lane in a 60' pocket with 60'taper; r Eastbound: one through lane and one right turn lane in a 150' pocket with 60'taper; r Control: side-street-stop-control.

Timing: Prior to issuance of first Traditional Subdivision building permit.

Mangini Parleway/Regency Parkway (Driveway 3)
Construct driveway as shown in (Figure 47 of the November 20,2019 Transportation Impact Study):
. Northbound: one shared lane;
o Westbound: one through lane and one left tum lane in a 60' pocket with 60'taper; . Eastbound: one through lane and one right tum lane in a 150' pocket with 60'taper; . Control: side-street-stop-control.

Timing: Prior to issuance of the first Regency Phase 2 building permit (5461h overall Regency Phase l/2 building permit excluding the 45 model home building permits).

Mitigation
Measures
#
JJ
34 Resolution No. 10670
Page l6 of 140

Page 141 ends

06/14/2022 Item No.9.

CONDITIONS OF APPROVAI, FOR THE TOLL BROTEERS AT FOLSOM RANCH PROJECT (PN 19.091)

WEST OF EASTBIDWELL ROAD, NORTH OFWHITEROCKROAD,EAST OFOAKAVENTIE PARI(WAY,ANI)

SOTITE OF MANGIM PARI(WAY

GPA, SPA, DAAMENDMENTS, SLVTSM, PD PERMIT,AND HOIISINGPLAN Condition
Satisfied?
Condition
will be
satisfied
prior to
issuance of
the first
building
permit.

This
condition
will be
satisfied
prior to
issuance of
the 3061h
building
permit in
Phase I
Comments
The Community Development
Department has reviewed and
approved the public and private
improvement plans for the subdivision
and verified that these improvements
are consistent with the approved
Transportation Impact Study. These
required improvements are included in
the approved plans for this intersection
and are curently under construction.

This condition will be satisfied prior to
issuance ofthe 306s production
building permit in the Toll Brothers at
Folsom Ranch Regency project. The
Phase I portion ofthe Regency project
consists of 593 dwelling units.

Responsible
Department
cD (E), PW,
FD
cD (E), Pw,
FD
When
Required
B
B
Condition of Approval
Mang ini P ar kw ay/D riv ew ay 4
Construct driveway as shown in (Figure 48 of the November 20,2019 Transportation Impact Study):
. Northbound: one shared lane;
. Westbound: one through lane and one left tum lane in a 60' pocket with 60'taper; r Eastbound: one through lane and one right turn lane in a 150' pocket with 60'taper; o Control: side-street-stop-control.

Timing: Prior to issuance of first Regency Phase I building permit.

Mangini Parkway/Driveway 5 (Stage 1)
Construct driveway as shown in (Figure 49 of the November 20,2019 Transportation Impact Study):

Northbound: one shared lane;
Westbound: one shared throughJeft tum lane;
Eastbound: one shared through-right turn lane;
Control : side-street-stop-control.

Timing: Prior to issuance of 3066 Regency Phase I building permit (excludes 45 model home unit building permits).

Mitigation
Measures
#

35. 36.

Resolution No. 1 0670
Page l7 of 140

Page 142 ends

06/14/2022 Item No.9.

CONDITIONS OF APPROVAL FOR TEE TOLL BROTHERS AT FOLSOM RANCH PROJECT (PN 19.091) WEST OF EASTBIDWELL ROAD, NORTH OFWHITEROCKROAD,EAST OF OAKAVENTjE PARI(WAY,AND SOUTH OF MANGII\I PARI(WAY
GPA, SPA. DA AMENDMENTS, SLVTSM, PD PERMIT, AND INCLUSIONARY IIOUSING PLAN Condition
Satisfied?
This
condition
will be
satisfied
prior to
issuance of
the 306th
building
permit in
Phase I
Condition
will be
satisfied
prior to
issuance of
the first
building
permit in
Phase 1.

Comments
This condition will be satisfied prior to
issuance of the 306th building permit in
the Toll Brothers at Folsom Ranch
Regency project. The Phase I portion
ofthe Regency project consists of593
dwelling units.

The Community Development
Department has reviewed and
approved the public and private
improvement plans for the subdivision
and verified that these improvements
are consistent with the approved
Transportation Impact Study. These
required improvements are included in
the approved plans for this intersection
and are currently under construction.

Responsible
Department
cD (E), PW,
FD
cD (E), PW
FD
When
Required
B
B
Condition of Approval
Mangini Parkway/Driveway 5 Rig ht-of-Way
Applicant shall dedicate right-of-way to City of Folsom for future construction of the ultimate Mangini Parkway/Driveway 5 intersection (Figwe 50 of the November 20, 2019 Transportation Impact Study):
r Northbound: one shared lane:
e Southbound: one right turn lane in a 150' pocket plus 60' taper and one shared throughJeft lane,
r Westbound: one through-right lane and one left turn lane in a 60' pocket with 60'taper; r Eastbound: one through-right lane and one left turn lane in a 60' pocket with 60'taper; . Control: side-street-stop-control.

Timing: Prior to issuance of 3061h Regency Phase I building permit (excludes 45 model home unit building permits).

East Bidwell Street/Regency Parkway (Driveway 6) Stage I Construct driveway as follou,s:
. Northbound: one through lane and one left hrn lane in a 150' pocket with 60' taper; . Southbound: one through lane and one right tum lane in a 150' pocket with 60'taper; o Eastbound: one shared lane,
. Westbound departure: two lanes separated by a median fbr two access gates shall be subject to City Engineers prior approval.
o Control: side-street-stop-control.

Timing: Prior to issuance of first Regency Phase I building permit.

Mitigation
Measures
#
37 38.

Resolution No. 10670
Pagel8of'140

Page 143 ends

06/14/2022 Item No.9.

CONDITIONS OF A?PROVAL FOR THT TOLL BROTIIERS AT FOLSOM RANCH PROJECT (PN 19.091)

WESTOF EASTBIDWELL ROAD, NORTII OFWHITEROCKROAD, EAST OF OAKAVENUE PARKWAY,AND

SOUTE OF MANGIM PARKWAY
GPA. SPA. DA AMENDMENTS. SLVTSM, PD PERMIT, AND INCLUSIONARY EOUSING PLAN Condition
Satisfied?
This
condition
will be
satisfied
prior to
issuance of
the 546th
building
permit in
Phase 2
Comments
This condition will be satisfied prior to
issuance of the 5461h building permit in
the Phase 2 portion ofthe Toll
Brothers at Folsom Ranch Regency
project, The Phase I portion ofthe
Regency project consists of 593
dwelling units, The VTSM for the
Phase 2 portion ofthe Regency project
has been approved by the City
Council.

Responsible
Denartment
cD (E), PW,
FD
When
Reouired
B
Condition of Approval
East Bidwell Street/Regency Parkway (Driveway 6)
Modifu driveway as shown in (Figure 51 of the November 20,2019, Transportation Impact Study), unless intersection has been signalized:
o Northbound: one through lane and one left tum lane in a 150'pocket with 60'taper; . Southbound: one through lane and one right turn lane in a 150' pocket with 60'taper; . Eastbound: one shared lane, plus a 300' northbound acceleration lane on East Bidwell Street to receive left-turns from Regency Parkway (a second NB lane on East Bidwell Street starting from Regency Parkway is equivalent to the 300' acceleration lane); . Westbound deparhle: trrro Ianes separated by a median fbr turo access gates shall be subject to City Engineers prior approval.
r Control: side-street-stop-control.

Timing: Prior to issuance of the first Regency Phase 2 building permit (546th overall Regency Phase l/2 building permit excluding the 45 model home building permits).

Mitigation
Measures
#

39. Resolution No. 10670
Pagel9ofl40

Page 144 ends

06/14/2022 Item No.9.

CONDITIONS OF APPROVAL FOR THE TOLL BROTHERS AT FOLSOM RANCH PROJECT (PN 19-091) WEST OFEASTBIDWELL ROAD, NORTH OFWtrTEROCKROAD, EAST OF OAKAVENTIE PARKWAY, AND SOI.rTE OF MANGIM PARJ(WAY
GPA, SPA, DA AMENDMENTS, SLVTSM, PD PERMIT, AND INCLUSIONARY IIrTTSTN/: PLAN Condition
Satisfied?
Yes
Comments
The final map for the subdivtston
includes the required right+f-way for
the Mangini Parkway,/Regency
Parkway intersectron. The right-of-
way dedication is shown on the final
map.

Responsible
Department
cD (E), Pw,
FD
When
Required
B
Condition of Approval
Mangini Parla,rtay/Regency Parkway (Driveway 6) Right-of-Way The owner/applicant shall dedicate right-of'-way to City of Folsom for future construction of the ultimate Mangini Parkway/Driveway 6 intersection (Figure 52 of the November 20,2019, Transportation Impact Study) :
o Northbound: one left tum lane in a 150' pocket with 60' taper, two through lanes, and a right turn lane in a 1 50' pocket with 60' taper;
Southbound: one right turn lane in a 1 50' pocket with 60' taper, two through lanes, and two left tum lanes in a 250' pocket with 120'taper. (i.[ote that the FPASP assumed a single southbound left turn lane.);
Westbound: one shared left-through-right lane, and one right tum lane; Westbound departure: two lanes separated by a median for tr,vo access gates shall be subject to City Engineers approval.

Eastbound: one shared lane
a
a
Timing: Prior to issuance of first Regency Phase I building permit Mitigation
Measures
#
40 Resolution No. 1 0670

Page 20 ends
Page 145 ends

06/14/2022 Item No.9.
corlDrTroNs oF AIPRoVAL FoR Tm ToLL BROTTmRS AT FOLSOM RANCH PROJECT (pN 19-091)

WEST OFEASTBIDWELL ROAD, NORTE OFWHITE ROCKROAD,EAST OF OAKAVENUE PARKWAYNAND

SOIITH OF MANGIM PARI(WAY
GPA, SPA. DA AMENDMENTS. SLVTSM. PD PERMIT. AND INCLUSIONARY HOUSING PLAN Condition
Satisfied?
Condition
will be
satisfied
prior to
issuance of a
building
permit.

Comments
The required stop control for the
various street intersections are shown
on the approved plans for the
subdivision. The Communify
Development Department will verif
compliance with this condition prior to
building permit issuance.

Responsible
Denartment
cD (E), PW
FD
When
Reouired
B
Condition of Approval
Phase 1 Internal Stop Control
Stop Control shall be installed at the following five locations within the Regency Phase I portion ofthe Toll Brothers at Folsom Ranch project:
o Regency ParkwayiStreet A (two-way-stop-control). Stop on A, no control on Regency . Regency Parkway/Street D (two-way-stop-control). Stop on D, no control on Regency o RegencyParkway/StreetE(all-way-stop-control).
r Regency Parkway/Street F (two-way-stop-control). Stop on F, no control on Regency. . Street DiStreet S (all-way-stop-control).

Roundabouts may replace stop conhol at internal intersections with authorization from the City Engineer. Location ofStop Control is shown in Figure 24, page 73 ofthe November 20,2019, Transportation Impact Srudy.

Timing: prior to issuance of the first Regency Phase I building permit.

Mitigation
Measures
#
41 Resolution No. 1 0670
Page2l of 140

Page 146 ends

06/14/2022 Item No.9.

CONDITIONS OF APPROVAL FOR THE TOLL BROTMRS AT FOLSOM RANCE PROJECT (PN 1949T) WESTOF EASTBIDWELL ROAD, NORTII OFWEITEROCKROAD, EAST OF'OAKAVENI]EPARK\ryAY, AND

SOUTE OT' MANGIM PARKWAY
GPA, SPA, DA AMENDMENTS, SLVTSM, PD PERII{IT, AI\D INCLUSIONARY TTfITTSIN(: PI,AN Condition
Satisfied?
Condition
will be
satisfied
prior to
issuance of
the 306s
building
permit in
Phase l.

Condition
will be
satisfied
prior to
issuance of
the first
building
permit in
Phase 3.

Comments
The required stop control for the
various street intersections is shown on
the approved plans for the subdivision.

The Community Development
Department will verif,i compliance
with this condition prior to issuance of
the 306th building permit in Phase L
The required stop control for the
various street intersections will be
shown on the approved plans for the
future Phase 3 subdivision (Traditional
Subdivision). The Community
Development Department will verifu
compliance with this condition prior to
building permit issuance in Phase 3.

Responsible
Denartment
cD (E), Pw,
FD
cD (E), PW
FD
When
Required
B
B
Condition of Approval
Phase I Internal Stop Control (Regency Phase 1)
Stop Control shall be installed at the lbllowing locations within the Regency Phase I portion of the Toll Brothers at Folsom Ranch project:
a Regency Parkway/Street G (two-way-stop-control). Stop on G, no control on Regency Regency Parkway/Street H (two-way-stop-contro1. Stop on H, no control on Regency.o Roundabouts may replace stop control at internal intersections with authorization from the City Engineer. Location ofStop Control is shown in Figure 24,Page 73 ofthe November 20,2019, Transportation lmpact Snrdy.

Timing: prior to issuance of the 306e Regency Phase 1 buildrng permit (excludes 45 model home unit building permits).

Phase 2 Internal Stop Control (Traditional Subdivision) Stop Control shall be installed at the following locations r Street TA./Street TC (two-way-stop-control). Stop on TC, no control on TA. r Street TA./Street TG (two-way-stop-control). Stop on TG, no control on TA. o Street TB/Street TC (trvo-way-stop-control). Stop on TC, no control on TB.

Roundabouts may replace stop control at internal intersections with authorization fiom the City Engineer. Location of Stop Control is shown in preceding Figure 25, page 74.

Timing: prior to issuance of the tlrst Traditional Subdivision building permit.

Mitigation
Measures
#

42. 43
Resolution No. 10670
Page22 of '140

Page 147 ends

06/14/2022 Item No.9.

Condition
Satisfieil?
Condition
willbe
satisfied
pnor to
issrmnce of
the 5466
builtling
perrnit in
Phase 2.

Comments
The required stop control for the
various sfieet intersections will be
shown on the approvod plar-rs for the
futrue Phase 2 subdivision. The
Commuqity Development Departnent
will verify complianee with this
qondifion priorto building permit
issuanc,e in Phase 2.

Responsibh
Department
cD(E),PW,
FD
\ilhen
Required
B
Condition of Approval
Regenq Phuse 2 Intefial Stop Csntrol
Stop Contol strall be installed at any internal ftsgensy Phaso 2 interseaions with four (or more) Iegs as directed by the City Engineer- Roundabouts may replace stop contol at itrtemal intersections with authorization from the City Engineer.

Timrng: Priot to issuance of the fust Regency Phase 2 building permit (546ft overall Regency Phase 1/2 building peuuit excluding the 45 model home building permits).

Mitigation
Measures
#
u,
ResplutionNo. 10670

Page 23 of 140 ends
Page 148 ends

06/14/2022 Item No.9.

Condition
Satisfied?
Condition
will be
satisfied
prior to
issuance of
the l38th
building
permit in
Phase 3.

Comments
This condition will be satisfied with
the development ofthe Phase 3 portion
(Traditional Subdivision) of the Toll
Brothers at Folsom Ranch project.

Responsible
Department
cD (E), Pw,
FD
When
Required
B
Condition of Approval
Implement either (A) or (B) below:
(A) The Capital Southeast Connector Joint Powers Authority (JPA) has programmed to realign this portion of White Rock Road and building a partial signal to accommodate anticipated U- Turns. Expand or construct a signalized intersection as fbllows:
. SB: A single shared lane for left and right turns.
r EB: A through lane and a leftAj-turn in 300' pocket plus taper. r WB: A through lane and a right-turn in 300' pocket plus taper e Signalize with protected phasing for left turns and U-tums. . Geometric design shall be consistent with Capital Southeast Connector Joint Powers Authority adopted standards.
(B) Channelize the intersection on the existing White Rock Road alignment to restrict turning movements to westbound right turns and southbound right tums. The westbound right turn requires a 365' deceleration lane, and the southbound right turn requires a 960' acceleration lane (Figure 53 of the November 20"2019, Transportation Impact Study).

Timing: Prior to opening the segment of Oak Avenue Parkway between Driveway 1 and White Rock Road, or prior to issuance of the l38th Traditional Subdivision building permit, whichever occurs first.

OR
Oak Ave Parkway/White Rock Rd
Mitigation
Measures
WDST OFEAST BIDWELL ROAD, NORTHOFWHITEROCKROAD,EAST OF OAK A\ryNUE PARKWAY,AND

SOU-TH OF MANGIM PARKWAY
FOR TEE TOLL BROTIIERS AT FOLSOM RANCH PROJECT (PN 19.091)CONDITIONS OF

PLANPD ANDSP
#
45 Resolution No. 10670

Page 24 of 140 ends
Page 149 ends

06/14/2022 Item No.9.

CoNDITIONS OF APPROVAL FOR Tm TOLL BROTHERS AT FOLSOM RANCH PROJECT (PN 19-09r) WEST OF EAST BIDWELL ROAD, NORTH OF WIIITE ROCK ROAD, EAST OF OAK AVENTIE PARI(WAY, Al\'D SOI.ITE OF MANGIM PARKWAY
GPA. SPA. DA AMENDMENTS. SLVTSM. PD PERMIT. AND INCLUSIONARY IIOUSING PLAI\I Condition
Satisfied?
Condition
will be
satisfied
prior to
issuance ofa
building
permit.

Comments
The Capital Southeast Connector -JPA
has executed a construction contract
with Goodfellow Brothers, Inc. to
construct the Capital Southeast
Connector fiom Prairie City Road to
East Bidwell Street. The construction
contract was executed in December of
2020. Grading and construction
commenced in April 2021. The project
will include the relocation and
signalization of the existing White
Rock Road,{East Bidwell Street
intersection. The project is expected to
be complete in the Spring of 2022.The
owner/applicant will pay the
Sacramento County Transportation
Development Fee prior to issuance of
all building permits in the subdivision.

Responsible
Denartment
cD (E), PW,
FD
When
Reouired
B
Condition of Approval
East Bidwell SL,4Ahile Rock Road
Signalize the existing White Rock Rd/East Bidwell Street intersection implementing either (A) or (B) below:
(A) The Capital Southeast Connector Joint Powers Authority (JPA) project has programmed to relocate and signalize the East Bidwell StreetAVhite Rock Road intersection as shown in the October 2017 geometric conceptual drawing, or equivalent improvements (i.e., three southbound approach lanes, four eastbound approach lanes, and three westbound approach lanes). Figure 54 of the November 20,2019, Transportation Impact Study provides a conceptual intersection layout for this mitigation. Under option A, fair share is defined as the Toll Brothers at Folsom Ranch Project's responsibility to the Sacramento County Transportation Development Fee. The Applicant is required to pay the Sacramento County Transportation Development Fee. Optron A can be considered to be implemented once the JPA has let contracts for construction of the new intersection. This will ensure that the mitigation rs constructed before project traffic adds 5 or more seconds ofdelay to the intersection.

OR
(B) Signalize the existing East Bidwell Street/White Rock Road intersection with the existing geometry. Figure 55 of the November 20,2019, Transportation Impact Sh.rdy provides a conceptual intersection layout fbr this mitigation.

Timing: Prior to issuance of the first Regency Phase 1 building permit.

Mitigation
Measures
#
46 Resolution No. 10670

Page 25 of 140 ends
← All documents from this meeting