SECTION 7 - SPECIAL PROVISIONS (Continued)
- 78 -
May 2023
ARTICLE 9 - PROJECT APPEARANCE
The CONTRACTOR shall maintain a neat appearance to the work site. Neat appearance shall include daily clean-up of all debris that may be generated from trucks and equipment using the approved Haul Route. Asphalt concrete, aggregate base, broken PC concrete, native soil, and debris developed during construction shall be disposed of concurrently within its removal. If stockpiling is necessary, the material shall be removed or disposed of weekly.
Dust caused by the passage of public traffic through the work shall be considered as resulting from the CONTRACTOR's performance of work. The CONTRACTOR is responsible for abating dust caused by his operation in accordance with Article 7 of these Special Provisions.
Full compensation for conforming to the provisions in this section, not otherwise provided for, shall be considered as included in price paid for the various contract items of work involved and no additional compensation will be allowed therefore.
ARTICLE 10 - PUBLIC SAFETY
The CONTRACTOR shall conform to the rules and regulations pertaining to safety established by the California Division of Industrial Safety.
The CONTRACTOR shall take all necessary precautions to protect the public from the hazards of open excavations. Trenches and other excavations shall either be safely covered or adequately fenced in a manner meeting the approval of the Engineer overnight and on weekends or at other times required by the Engineer for safety. No open trenches or any other open excavation shall be left open for more than two (2) working days. In the absence of covering or fencing, CONTRACTOR shall backfill all open excavations at his expense.
Payment for fencing, steel plating, installing K-rail, and temporary excavation backfill shall be included in the prices paid in the various items of work and no additional compensation will be allowed.
ARTICLE 11 - ARCHAEOLOGICAL AND PALEONTOLOGICAL DISCOVERIES
If discovery is made of items of archaeological or paleontological interest, the CONTRACTOR shall cease excavation of the area of discovery and shall not continue until such time as approved by the Engineer. The Engineer shall then direct excavation operations within the area of discovery.
Discoveries include but are not limited to, dwelling sites, stone or other artifacts, animal bones, human bones and fossils.
The CONTRACTOR shall be entitled to an extension of time in accordance with the provisions of Subsection 6-3 of the Standard Specifications. Should the CONTRACTOR's operations be affected materially, additional work will be paid for as extra work as provided in Subsection 3-3, "EXTRA WORK," of the Standard Specifications.
SECTION 7 - SPECIAL PROVISIONS (Continued)
- 79 -
May 2023
ARTICLE 12 - GEOTECHNICAL INVESTIGATION
The CITY has not conducted a geotechnical investigation where the proposed water improvements are to be constructed. Each prospective bidder shall be responsible for obtaining any geotechnical information that he/she needs to prepare for his/her bid. Each prospective bidder shall be responsible for the cost of obtaining the required geotechnical information for his/her bid.
By submitting a bid, the CONTRACTOR acknowledges that he/she has satisfied himself/herself as to the nature of the work, including but not restricted to the conditions affecting handling and storage of materials, disposal of excess material, level and amount of groundwater , and ascertaining existing conditions that affect labor, materials and equipment costs.
In the event groundwater is encountered, the CONTRACTOR shall provide and maintain dewatering during construction in accordance with the standard specifications and the requirements of the CITY's NPDES Order No. 85-83 issued by the California Regional Water Quality Control Board (Santa Ana Region).
All costs for dewatering, when encountered during construction, shall be included in the contract bid prices for the various items of work. No separate payment will be allowed.
All costs for geotechnical testing other than compaction testing shall be considered as included in the price paid for the various contract items of work involved and no additional compensation will be allowed therefore.
ARTICLE 13 – MOBILIZATION/DEMOBILIZATION
Mobilization and demobilization shall consist of preparatory work and operations including, but not limited to, those necessary for the movement of personnel, equipment, materials and incidentals to the project site necessary for work on the project and for all other work and operations which must be performed or costs incurred including bonds, insurance and financing prior to beginning work on the various contract items on the project site. Any bonds that must be posted or proof of insurance issues that arise must be resolved prior to mobilization and/or demobilization. Mobilization and demobilization shall also include the time and labor to move the necessary construction equipment to and from the job site, supervisory time on the job by the CONTRACTOR’s personnel to keep the construction site in a safe condition, and all other related work as required for all non-working days during the course of construction. The CONTRACTOR is responsible for securing an adequate storage site for equipment and materials.
Payment for mobilization and demobilization shall be included in the bid price per Lump Sum for Clearing and Grubbing, including Mobilization and Demobilization in the bid proposal and shall include full compensation for furnishing all labor, materials, equipment, rental of necessary equipment, materials and storage sites for storage purpose, and incidentals necessary to mobilize and demobilize in accordance with the paragraph above.
SECTION 7 - SPECIAL PROVISIONS (Continued)
- 80 -
May 2023
ARTICLE 14 - TRAFFIC CONTROL
Traffic control shall conform to the latest editions of the California Manual on Uniform Traffic Control Devices (CA MUTCD) and with Caltrans Standard Plan T11 Traffic Control System for lane closure on multi-lane conventional highways. Notes 2 and 6 of the Caltrans Standard Plan T11 regarding illuminated advanced warning signs and cones shall not apply.
A. VEHICLE TRAFFIC CONTROL
A minimum of one (1) eleven foot lane for each direction shall be kept open and maintained for public use at all times except as indicated on the plans or as directed by the Engineer during construction.
B. PEDESTRIAN TRAFFIC CONTROL
A minimum of one four foot wide all-weather pedestrian walkway shall be kept open and maintained to the satisfaction of the Engineer along both sides of each public street at all times during construction.
C. ACCESS TO ADJACENT PROPERTIES
A minimum of one (1) driveway per property shall be accessible and maintained at all times unless otherwise authorized by the City. Temporary drive approach ramps constructed of recycled materials or temporary asphalt (12’ minimum width) may be installed as approved by the Engineer. Trench plates may also be used.
D. GENERAL TRAFFIC CONTROLS
Notification letters shall be hand delivered by Contractor two (2) weeks in advance of beginning of construction giving notice of traffic restriction, period of construction, and suggested use of alternate routing. Exact wording on the advanced notification letters will be approved by the Engineer.
Five (5) 4' x 8' CONSTRUCTION INFORMATION signs shall be fabricated and constructed per City standard plan B-135 (1 of 3 & 3 of 3), two weeks in advance, at the beginning and at the end of the each project limits.
One sign north of Newhope Street and Salinaz Drive
One sign north of Euclid Avenue and Woodbury Street
One sign south of Euclid Avenue and Woodbury Street
One sign south of Newhope Street and Westminster Avenue One sign east of Newhope Street and Westminster Avenue.
Traffic control devices shall comply with Section 12 of the Standard Specifications.
The Contractor shall also provide electronic changeable message boards, 2 for Woodbury Rd., and two additional message boards for Euclid St. and Newhope St.
All signs shall be installed two weeks in advance from the start of work to alert motorists of the period of traffic delays anticipated during lane closures.
SECTION 7 - SPECIAL PROVISIONS (Continued)
- 81 -
May 2023
The Contractor shall submit traffic control plans prepared by a civil engineer registered in the State of California, stamp the plans for approval at least ten (10) working days prior to commencement of work to the City of Garden Grove Traffic Division and City of Santa Ana Public Works Department for approval. The plans shall show all businesses, directional signs, driveway entrances, signs, delineation, tapers, dimensions, etc., for traffic control. The traffic control plans should include Traffic Control Notes (that can be found at: revised-traffic-control-notes-3-8-22.pdf (ggcity.org ). No construction will begin until the Contractor's traffic control plans are approved by the City of Garden Grove and City of Santa Ana. The plans shall indicate the various phases of work and the proposed traffic control methods for each phase of construction on each street segment. The plans shall conform to the requirements of the latest edition of the CA MUTCD, these Special Provisions and City of Santa Ana requirements.
Flashing arrow signs shall be used as noted in the traffic control plans. (Battery or solar powered only).
Placement of temporary pavement marking tape shall consist of applying, maintaining, and later removing temporary traffic stripe (traffic line) and pavement marking tape at the locations shows on the plans or designated by the Engineer in conformance with these special provisions.
Temporary tape and/or painted stripes and removal of existing channelization may be required for traffic control. Tape for temporary traffic stripes and pavement markings will be a reinforced plastic type especially designed for ease of removal.
Temporary stripes shall be placed to the line established by the Engineer. Completed stripes shall be straight on tangent alignment and shall be on a true arc on curved alignment.
Surfaces on which the tape is to be applied shall be cleaned of all dirt and loose material and shall be dry when the tape is applied. The air temperature and pavement temperature at the time the tape is applied shall be 50°F or above. Tape shall not be applied over existing painted stripes or markings.
After the tape has been applied it shall be rolled slowly with a rubber tired vehicle or roller to ensure complete contact with the pavement surface.
Temporary traffic stripes and pavement markings that are damaged from any cause during the progress of the work shall be repaired or replaced by the Contractor at his expense.
When no longer required for the direction of public traffic, as determined by the Engineer, the tape shall be removed and disposed of outside the highway right of way and all marks used to establish satisfactory lines for the temporary stripes and pavement markings shall be removed from the pavement.
Every effort shall be made by the Contractor to insure traffic safety. If in the opinion of the Engineer additional signing or delineation is required for traffic safety, then the Contractor shall furnish and place the additional signs or delineators at no additional cost to the Agency.
SECTION 7 - SPECIAL PROVISIONS (Continued)
- 82 -
May 2023
E. ROAD CLOSURE CONDITIONS
When construction conditions do not permit through traffic to use the street as determined by the Engineer, the following conditions will prevail:
The Engineer must receive notice from the Contractor of any proposed road closure at least 48 hours prior to the actual closure. Before any road closures may be approved by the Engineer, specific detour plans for signing and barricading must be approved by the Traffic Engineer. At the times during the road closure conditions, a ten-foot (10') minimum width access corridor shall be kept open and maintained for emergency vehicles.
F. TRAFFIC CONTROL AND SAFETY
All control, warning and safety devices shall conform to the requirements set forth in the latest edition of the CA MUTCD.
If attention is directed to the existence of a hazard and the Contractor fails to provide such devices, said devices will be placed or caused to be placed by the City. The cost of placement of these devices shall be the sole responsibility of the Contractor and shall be paid for at the rate of $500.00 per hour for labor and the pickup truck, $50.00 per day per barricade, and any other costs incurred by the City relative to traffic control. Said costs, if any, shall be deducted from the progress payments and from the total Contract price for the work.
When entering or leaving roadway carrying public traffic, the Contractor's equipment, whether empty or loaded, shall in all cases yield to public traffic. No excavation within five feet of the traveled way shall remain open no longer than is necessary to perform the work, and in no case shall remain unfenced or unplated overnight or on weekends.
The Contractor shall provide and maintain all signs, barricades, pedestals, flashers, delineators and other necessary facilities for the protection of the motoring public within the limits of the construction area and all its approaches, including advanced signing and barricades. He shall also post proper signs to notify the public regarding the conditions of the roadway, all in accordance with the provisions of the Vehicle Code, and the CA MUTCD, as published by the US Department of Transportation, Federal Highway Administration.
The Contractor shall conduct his operations so as to provide reasonable access to the adjacent properties and shall have no greater length or quantity of work under construction than he can properly prosecute with a minimum of inconvenience to the public and other contractor engaged on adjacent or related work.
Portable delineators shall be spaced as necessary for proper delineation of the travel way.
The spacing between delineators shall not exceed the requirements set forth in the CA MUTCD.
SECTION 7 - SPECIAL PROVISIONS (Continued)
- 83 -
May 2023
If the traffic cones or portable delineators are damaged, displaced or are not in an upright position from any cause, said cones or portable delineators shall immediately be replaced or restored to their original location in an upright position by the Contractor.
The Contractor shall furnish such flagmen as are necessary to give adequate warning to traffic or to the public of any dangerous conditions to be encountered. Flagmen, while on duty and assigned to give warning to the public of any dangerous conditions to be encountered, shall perform their duties and shall be provided with the necessary equipment in accordance with the current Caltrans "Instructions to Flagmen." The equipment shall be furnished and kept clean and in good working condition by the Contractor at his expense.
Should the Contractor appear to be neglectful or negligent in furnishing warning and protective measures as above provided, the Engineer may direct attention to the existence of a hazard and the necessary warning and protective measures shall be furnished and installed by the Contractor at this expense. Should the Engineer point out the inadequacy of warning and protective measures, such action on the part of the Engineer shall not relieve the Contractor from responsibility for public safety or abrogate his obligation to furnish and pay for these devices.
All existing stop signs and street name signs shall be maintained in visible locations during construction and permanently relocated or removed as directed by the Engineer. Signs, which need not be maintained during construction or permanently relocated, shall be salvaged and returned to City Yard.
Temporary Traffic Lanes
1. Temporary control of traffic in work areas requires the provision of adequate street space to accommodate the traffic demands, particularly during peak traffic hours.
2. Temporary traffic lane requirements for construction activities in Arterial STREET may be specified on the permit, on the plans or in the specifications. These requirements constitute a part of the work and must be adhered to as rigidly as any other specification.
3. Construction activities on Arterial STREET shall be planned and scheduled to minimize interference with traffic. Except for emergencies, no construction work shall encroach into a moving lane of traffic between the hours of 4:30 PM to 7:30 AM unless otherwise authorized by the Engineer.
No construction activities are allowed before 9:00 AM and no lane closures are allowed before 8:00 AM unless otherwise authorized by the Project Engineer or City Traffic Engineer. Any lane s closed shall be re-opened by 2:00 PM. Construction shall be scheduled in such a manner that the project site is completely cleaned, watered and/or swept by 2:30 PM.
Any work activities before 7:30 AM and/or beyond 4:00 PM shall be considered as overtime, if allowed by the Engineer.
4. All temporary traffic lanes shall be a minimum of eleven feet in width at either direction unless otherwise authorized.
SECTION 7 - SPECIAL PROVISIONS (Continued)
- 84 -
May 2023
5. Suitable surfacing must be provided for the temporary traffic lanes in work areas. When traffic is diverted from the existing pavement, temporary surfacing shall be provided and shall be in conformance with the current standard specification for such work issued by the City.
6. Construction equipment not actively engaged in the work and employee vehicles shall not be parked near the work in such a manner as to further restrict or obstruct traffic flow.
Vehicles and equipment in continuous or frequent use may be operated or parked in the same traffic lanes as the work obstruction.
Control, Warning and Guidance Devices
1. Devices fall into six categories: (1) Signs, (2) Barricades, (3) Delineators, (4) High Level Warning Devices, (5) Warning Lights and (6) Flashing Arrow Signs.
Sign Types
1. Traffic signs are classified into several functional groupings: construction, warning, guide and regulatory.
2. The use of "Regulatory" signs must be approved by the Engineer. When required, all such signs will be provided, installed and maintained by the Contractor.
3. Existing "Regulatory" signs within or adjacent to the work area must be maintained by the Contractor. If existing signs are not appropriate for traffic conditions in the work area, the Engineer must be notified to determine if signs shall be covered, replaced or relocated.
4. Temporary "No Parking" signs shall be installed and removed as directed by the Engineer.
5. Temporary "No Parking" signs shall not be posted on any tree, utility pole or traffic sign.
Sign Placement
1. The location of signs will depend upon alignment, grade, and location of street intersections and posted speed limit. Signs shall face and be visible to oncoming traffic and be mounted to resist displacement. The center of signs shall be at least four and one-half feet above the roadway. Vertical clearance for signs where pedestrian traffic is permitted shall be two feet. "Advance Warning" signs shall be located on the right hand side of traffic lanes.
2. All signs, which are to convey their messages during darkness, shall be reflectorized or illuminated.
3. No signs or supports shall bear any commercial advertising.
4. Warning, Guide and Regulatory signs normally shall be installed immediately before work is to commence and must be removed immediately after work is complete.
5. If at any time a sign is not required, it shall be covered or removed.
6. Construction signs shall be installed in accordance with Section D, General Traffic Controls.
SECTION 7 - SPECIAL PROVISIONS (Continued)
- 85 -
May 2023
Barricades
1. Barricades shall not be placed in a moving lane of traffic without advance warning, such as a high level warning devices and appropriate delineation.
2. Barricades shall be of three types: Type I, Type II, or Type III.
Delineators
1. All delineators used at night must be reflectorized adequately or internally luminated.
2. Opposing traffic shall be separated by delineators, traffic striping, or raised pavement markers.
3. Where traffic is diverted to the left of an existing double yellow centerline, into a painted median or into a left turn lane, delineators shall be utilized beyond the work area to return traffic to normal lanes.
4. Devices, which could roll into the adjacent traffic lane when hit, shall not be used.
5. Metal or wooden post mounted in concrete-filled buckets or on automobile wheels are examples of types, which are prohibited.
6. Maximum Recommended Delineator and Sign Placement
Merging Signs Space
Traffic Taper Spacing Spacing Between and Speed Length Transition Tangent Advance of Taper______ 25 mph 125 ft. 25 ft. 25 ft. 100 ft.
30 mph 180 ft. 25 ft. 25 ft. 250 ft.
35 mph 245 f t. 25 ft. 25 ft. 250 ft.
40 mph 320 ft. 25 ft. 25 ft. 250 ft.
45 mph 540 ft. 25 ft. 25 ft. 350 ft.
High Level Warning Devices
1. High level warning devices shall be at least 9 feet high with legs, base or truck mounting designed to resist overturning.
2. Sandbags may be used to add weight to the base or legs.
3. High-level warning devices shall be equipped with a yoke at the top to accommodate at least three flags.
4. Flags shall be high visibility orange, with stays to keep flags extended.
5. Torn or dirty flags shall be immediately replaced.
6. High level warning devices are not permitted on Arterial STREET. Flashing arrow signs are required.
Warning Lights
1. Flashers shall be used only to outline the work area or to provide advance warning.
SECTION 7 - SPECIAL PROVISIONS (Continued)
- 86 -
May 2023
2. Flashers shall not be used to channelize traffic, to separate opposing traffic, or to delineate the path that traffic is to follow.
Flashing Arrow Signs
1. All flashing arrow signs shall meet the following requirements:
Minimum
Type Minimize Minimum Number Legibility
____________Size of Panel Lamps Distance
II 36" x 72" 13 ¾ mile
I 48" x 96" 15 1 mile
2. Flashing arrow signs are intended to supplement, not replace, other work area traffic control device.
3. Flashing arrow signs are required for each lane closure on an arterial street.
Pavement Striping/Markings
1. Restriping will be considered under the following conditions:
a) Where traffic is diverted for extended periods.
b) When traffic is to be diverted to the left of an existing double yellow centerline for two or more consecutive nights.
c) When the work area is adjacent to an intersection and results in a transition within the intersection.
d) When the traffic lane is continuously obstructed for more than 5 working days and traffic volumes require two or more lanes in a single direction. e) In other unusual situations when traffic and physical conditions require special treatment.
2. The Engineer shall determine the need for and extent of striping removal and restriping.
3. The installation of temporary striping or pavement markers will be the responsibility of the Contractor.
Pedestrian Traffic
1. When the work area encroaches upon a sidewalk, walkway or crosswalk area, special consideration must be given to the pedestrian safety.
2. A minimum of advance warning is required.
3. The pedestrian must be separated from the work area.
4. Protective barricades, fencing, handrails and bridges, together with warning and guidance devices must be used to define the passageway.
SECTION 7 - SPECIAL PROVISIONS (Continued)
- 87 -
May 2023
5. Pedestrian walkways must be approved prior to installation by the Engineer.
6. Walkways shall be maintained at least four feet in width.
7. Minimum vertical clearance to any obstruction within the walkway must be two feet.
8. At no time shall pedestrians be diverted into a portion of the street without a physical barrier being provided, and in those areas where material can fall, the walkway shall be covered.
9. Appropriate signs and warning must be installed at the construction limits in advance of and crosswalk or pedestrian way that will be closed.
Flag Person Control
1. Flag person will be required:
a) Where workers or equipment intermittently block a traffic lane. b) Where the traffic plan allows the use of one lane for two directions of traffic. c) Where the safety of the public and workers determines there is a need.
2. Flag persons should be stationed far enough from the work to slow down or stop vehicles before they enter the work area.
3. Flag persons shall wear orange jacket (vest) for daytime use and a reflectorized belt and harness for nighttime.
4. During daylight hours, flag person shall be equipped with a sign paddle and at night, they shall use a red light.
Pursuant to the provisions of Section 14005 of the California Government Code, and pursuant to the provisions of Section 21400 of the California Vehicle Code, that the signs, lights, and devices shall conform to the provisions of the "Manual of Traffic Controls for Construction and Maintenance Work Zones," issued by the Department of Transportation for the State of California.
G. PAYMENT
Payment for Traffic Control shall be made at the Contract price bid per Lump Sum and shall include full compensation for furnishing all labor, materials, tools, equipment and incidentals, and for doing all the work involved in preparation of traffic control plans, approval of traffic control plans, implementation of traffic control, including but not limited to, Construction Information Signs, electronic changeable message board signs, applying, maintaining and removing tape for temporary traffic stripes and pavement markings, complete in place, flashing arrow sign, as specified in these special provisions and as directed by the Engineer, and no additional compensation will be allowed therefore.
SECTION 7 - SPECIAL PROVISIONS (Continued)
- 88 -
May 2023
ARTICLE 15 - CONSTRUCTION YARD SITE
The proposed project is located in residential, office, industrial and open areas. CONTRACTOR shall at his expense, secure a site for storing materials, supplies, and equipment. It is the CONTRACTOR’S responsibility to secure a yard prior to the start of construction. Securing a site, although for this project, shall be agreed upon separately by the Contractor and Private Entity or Contractor and the City’s Realtor Agent. Available vacant properties in the project area may not be zoned for a construction yard. It is recommended to check with the City's Planning Department for zoning. A conscious effort on the CONTRACTOR ’s part is required, that due regard to the rights of the public must be observed at all times. Possible obstruction and inconvenience shall be kept to the minimum.
If the CONTRACTOR pursues to enter in agreement with the City to use City or City leased property as a construction yard a temporary use permit is required with an application fee of $50.00. The application is subject to review and approval by the Realtor Agent from the Planning Department. Before moving in to the site, CONTRACTOR shall provide a certificate of insurance naming the City of Garden Grove as additional insureds from all liability. The construction yard site will become part of the project. All conditions and requirements of the project also apply to the construction yard.
Construction materials shall not be stored in streets, roads or highways for more than three (3) working days after unloading nor will the materials be stored in the streets over weekends and holidays. All materials or equipment not installed or used in the construction within three (3) working days after unloading shall be stored at the construction yard.
Construction equipment shall not be stored at the work site before its actual use on the work nor for more than three (3) working days after it is no longer needed on the work. All repairs or assembly of equipment that will take two (2) or more working days shall be done at the construction yard. All equipment and materials shall be stored at the yard during weekends and holidays, unless otherwise authorized by the Engineer.
Excavated materials shall not be stored in public streets, roads or highways. Excavated materials that may be suitable for backfill shall be stored at a site of CONTRACTOR's choice. The Engineer shall have a safe access to the site for purposes of inspection and testing at all times.
Full compensation for conforming to the requirements of this Article shall be considered as included in the prices paid for the various contract items of work and no additional compensation will be allowed.
ARTICLE 16 - PROTECTION AND RESTORATION OF EXISTING UTILITIES AND
NON-HIGHWAY FACILITIES
Attention is directed to Sections 5-2 and 7-9 of the Standard Specifications and the following special provisions:
All utilities including water, gas, oil, telephone, electrical, cable TV fiber optic systems, traffic signals, sewer mains and services, storm drains and street light conduit and wires shall be protected in place, except as noted on the project plans.
SECTION 7 - SPECIAL PROVISIONS (Continued)
- 89 -
May 2023
Abandoned facilities are likely to be encountered on this project. Many abandoned facilities are not available through the public records nor will they be located by Underground Service Alert (USA), however if they are encountered, the abandoned facilities shall be saw cut and removed to accommodate the proposed construction. The facilities shall be capped or slurry backfilled as deemed appropriate by the Engineer. The CITY will pay for the transportation and disposal of such abandoned facilities and capping of such facilities on a time and materials basis in accordance with the Standard Specifications.
The CITY does not guarantee the accuracy of depth, size, type, material and location of all utilities shown on the plans or marked in the field by utility companies. Data was provided to the CITY based upon available records. It is to be used for information purposes only.
In order to provide lead time to resolve unforeseen utility conflicts, CONTRACTOR shall pot hole and ascertain the true location and depth of all underground utilities and services as shown or located within the lines of excavation and/or as marked by their respective owners in the field. All potholing shall be completed before CONTRACTOR will receive first progress payment or will be allowed to commence construction. Utilities marked in the field and not shown in the project plan shall be treated the same as if shown in the project plan. CONTRACTOR shall attempt to expose utilities by excavating an area three (3) feet in all directions around the location shown on the plans or marked in the field that may conflict with the proposed sewer main(s). Should the CONTRACTOR fail to locate the utility, CONTRACTOR shall immediately notify the utility purveyor and Engineer and the CONTRACTOR shall proceed on schedule. CONTRACTOR shall not be entitled to delays, damages or cost for failure to locate a utility by potholing. After exposing the utilities and if in the opinion of the CONTRACTOR a utility is in conflict with the proposed improvements, CONTRACTOR shall immediately notify the Engineer and allow utilities reasonable time to relocate, realign or remove their facilities at no additional cost to the CITY.
CONTRACTOR shall exercise extreme care in exposing, locating, supporting, protecting and working in the vicinity of existing utilities. CONTRACTOR shall hand dig within three feet (3’) on all sides of these utilities; main lines, service lines and other utility appurtenances.
CONTRACTOR shall arrange a compatible work schedule with all utility companies involved.
CONTRACTOR's attention is also directed to overhead and above ground utilities and poles that exist within the project site that may not be shown on the project plans, but are visible in the field.
All utilities above and underground must be protected in place, unless otherwise specified in the project plan.
The CONTRACTOR shall use extreme caution around all existing utilities, especially Southern California Gas, Southern California Edison and AT&T pipes and conduits. Furthermore, the CONTRACTOR shall indemnify and hold harmless the City of Garden Grove, the CITY, its officers, its board members, employees, and consultants from any and all claims, suits, or actions resulting from or arising out of any damage(s) caused to such utilities as a result of the CONTRACTOR’s failure to adequately protect such utilities in place.
The CONTRACTOR will not be entitled to damages or additional payment for delays attributable to utility relocations or alterations if utilities are correctly located and shown on the plan. The CONTRACTOR, however, will be given an extension of time for unforeseen delays due to interferences by utilities. This work includes searching within three (3’) feet on both sides of a marked utility in the field (not shown in the plans) that is not found or never existed.
SECTION 7 - SPECIAL PROVISIONS (Continued)
- 90 -
May 2023
All costs incurred for potholing, hand digging, exposing, locating, supporting, protecting, maintaining and providing reasonable time to relocate or resolve conflict of underground and above ground utilities, shall be included in the price bid for the various items of work and no additional compensation will be allowed.
The CONTRACTOR, prior to submitting his/her bid, shall first inquire from the utility owners listed regarding type of facility, line locations, size, material, manhole locations if any, specifications and requirements concerning the protection and support of their respective main, trunk lines, services lines and other appurtenances.
The CONTRACTOR is hereby notified that some waterlines in the CITY are steel encased. These encased waterlines are to be treated as asbestos concrete (AC) lines. If they are not supported they will collapse and all resulting damages and delays will be the sole responsibility of the CONTRACTOR and no additional compensation or time will be allowed. The costs of obtaining any required permits, protecting and supporting of all utility lines, including service and lateral lines shall be included in the various items of work and no additional compensation will be allowed.
No utility line shall be removed from service without written permission from the Engineer. If permitted, then it is the CONTRACTOR’s responsibility to install temporary services as needed in the field and as approved by the Engineer at no cost to the CITY.
CONTRACTOR shall notify the Underground Service Alert (USA) giving at least 2 working days notice --- (800) 422-4133.
The following is a list of utility companies and purveyors who may have underground utilities within the project right-of-way:
City of Garden Grove, Sanitary District (714) 741-5534 City of Garden Grove Water Division (714) 741-5349
Garden Grove Traffic Division (714) 741-5185
AT&T (714) 666-5692
Crown Castle (724) 416-2449
Southern California Edison Co. (714) 870-3219
Southern California Gas Company
City of Santa Ana Public Works
Time Warner Cable
XO Communication
(714) 634-5067
(714) 647-5020
(714) 903-8446
(949) 417-7841
Some of the above utilities and purveyors are not Underground Service Alert (USA) members. It shall be the CONTRACTOR's responsibility to call, notify and make certain that utilities have responded to his notification. Damage to utilities, caused by failure to notify, is the CONTRACTOR’s sole responsibility.
The CONTRACTOR shall arrange and coordinate his work to permit utilities to make any necessary adjustments required by the construction of the various items in this contract.
SECTION 7 - SPECIAL PROVISIONS (Continued)
- 91 -
May 2023
CONTRACTOR shall also protect facilities in place as shown on the plans or as marked in the field, and "To be relocated by others", in both original and relocated positions and any damage to such facilities shall be immediately repaired at no cost to the CITY.
When damage occurs to existing utilities, CONTRACTOR shall notify the Owner of the Utility and the Engineer immediately and take whatever action necessary to mitigate further damage to the utility and the surrounding area.
The CONTRACTOR is notified therefore, that he is responsible and liable for all costs in rectifying damages to any utilities caused as a result of his operations. At the request of the CITY, costs in rectifying such damages can be withheld or deducted from the final progress payment due to CONTRACTOR at the discretion of the Engineer.
The CONTRACTOR is responsible for protecting water service connections, sewer laterals, telephone conduits, cable TV conduits, electrical conduits, traffic signal conduits and all other utility service connections whose location can be determined or inferred by buildings and other above-ground visible facilities such as valve boxes, manholes, vaults, pull boxes and the like in spite of the fact that they are not shown on the plans or marked in the field. Therefore, the CONTRACTOR shall establish the location of such utilities in the field and determine the cost of protecting or relocating those facilities in order to perform the work indicated in the contract documents and include that cost in his bid. The CONTRACTOR shall assume that every parcel, including a vacant parcel, is served by a service connection for each type of utility.
All existing improvements, including utilities, shall be protected in place unless otherwise shown on the contract plans or approved by the Engineer. All existing improvements damaged by the CONTRACTOR in the performance of his work shall be replaced in its original or better condition. This includes, but is not limited to landscaping, trees, irrigation lines, sprinklers, planters, foundations, walls, driveways, sidewalks, mailboxes, parking curbs, and utilities whether they are located on private property or within the public right-of-way.
Payment for protecting or removing and replacing all facilities, or coordinating utility adjustments, except for those items of work specifically included as separate bid items in the Bid Proposal shall be considered as paid for in the various contract items and no additional compensation will be allowed.
Private mailboxes, planters, and other facilities, etc. as shown on plans or within construction areas in the field shall be relocated by the CONTRACTOR. Payment for relocations shall be included in the various items of work and no additional compensation will be allowed.
ARTICLE 17 - EXISTING HIGHWAY FACILITIES
All work performed on existing highway facilities shall be done in accordance with applicable sections of the Standard Specifications and other portions of these special provisions with the following modifications and additions:
A. Miscellaneous Highway Facilities
SECTION 7 - SPECIAL PROVISIONS (Continued)
- 92 -
May 2023
Care shall be taken in all work performed in the removal of all traffic signs, devices, barricades, posts, barriers, and guard railings. Such devices, etc., shall be carefully removed by the CONTRACTOR as shown on the plans or as directed by the Engineer, cleaned of all adhering materials and shall be stockpiled within project limits for reuse.
Payment for all labor, materials, tools, and equipment used in removing, cleaning, transporting, relocating, and doing all the work involved shall be included by the CONTRACTOR in various bid items, and no additional compensation will be allowed.
B. Damaged Portland Cement Concrete Removal and Replacement
Portland Cement Concrete (PCC) damaged by the CONTRACTOR’s operation shall be removed and replaced in kind. Work shall include all PCC curbs, gutters, cross gutters, spandrels, driveways, driveway approaches, slabs, sidewalks, decorative crosswalks, and all other miscellaneous PCC construction. Concrete shall be removed to neatly sawed edges with saw cuts made to a minimum depth of 1 inch. Concrete sidewalk or driveway to be removed shall be neatly sawed in straight-line parallels either to the curb or at right angles to the alignment of the sidewalk. No section to be replaced shall be smaller than forty-eight inches (48") in either length or width. If the saw cut in sidewalk or driveway would fall within forty-eight inches (48") of a construction joint, expansion joint, or edge, the concrete shall be removed to the joint or edge, except that where the saw cut would fall within twelve inches (12") of a score mark, the saw cut shall be made in and along the score mark. Curb and gutter shall be sawed to a depth of 1 (one) inch on a neat line at right angles to the curb face. PCC and all other material unsuitable for use as fill, as determined by the Engineer, shall be removed from the right- of-way and disposed of by the CONTRACTOR at a site of his own choice and he shall pay all costs incidental to the disposal. Sharp edges left on concrete after saw cutting shall be ground in a manner acceptable to the Engineer.
Payment for portland cement concrete removal and replacement shall be included in the unit prices paid for the various items of work, that necessitated the PCC removal and no additional compensation will be allowed. Said payment shall include full compensation for furnishing all labor, materials, tools, equipment and incidentals and performing all the work involved in excavating, removing, replacing, breaking, crushing, saw cutting, backfilling, loading, hauling and disposing of all material, and performing all the work involved. All PCC replacement shall conform to City standards and be in kind.
C. Remove and Restore Traffic Striping, Signing, Legends, Pavement Markings and Pavement Markers
Existing pavement markers shall be removed and disposed of when no longer required for traffic lane delineation due to construction.
Existing striping and pavement markings shall be removed by sand blasting. Existing pavement markers shall be removed prior to installation of AC overlay or slurry seal.
Sandblasting shall be used for the removal of painted traffic stripes and pavement markings and for removal of objectionable material. If such removal operation is being performed within ten feet (10') of a lane occupied by public traffic, the residue including dust shall be
SECTION 7 - SPECIAL PROVISIONS (Continued)
- 93 -
May 2023
removed immediately after contact between the sand and the surface being treated. Such removal shall be by a vacuum attachment operating concurrently with the blast cleaning operation.
Nothing in these special provisions shall relieve the CONTRACTOR from his responsibilities as provided in Section 7-10, "Public Convenience and Safety", of the Standard Specifications.
Any depressions or voids left in the roadway as a result of removing the existing raised pavement markers will be filled with hot bituminous adhesive or as directed by the Engineer.
CONTRACTOR shall provide cat tracks for review prior to final application of striping. The City of Garden Grove shall have 24 hours (1 working day) review time to provide corrections to, or approval of, the cat tracks. All existing striping shall be restriped to satisfaction of the Engineer.
Full compensation for removing, disposing and restoring, traffic stripes and pavement markings - including filling voids or depressions created by removing pavement markers, shall be included in the contract lump sum price for the traffic signing and striping and shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals and performing all work involved, and no additional compensation will be allowed.
D. Damaged Asphalt Concrete Pavement Removal and Replacement
Asphalt concrete ("A.C.") pavement shall be cut initially by saw cutting to full depth of A.C. at the limits of the removal prior to removal of A.C. A.C. damaged by the construction operation shall be removed and replaced as described in this provision at no cost to the CITY. After backfilling the excavation, the existing A.C. pavement shall be saw-cut again to full depth at a point not less than 12 inches outside the limits of removal as shown in the backfill and resurfacing detail. If the width of existing pavement between proposed A.C. saw cut and edge of adjacent P.C.C. curb and gutter is less than sixty (60) inches, this area shall be removed and new pavement shall be extended to the P.C.C. curb and gutter. All saw cuts should be along straight lines either parallel or perpendicular to line of removal. The use of pavement breaking equipment (stompers) is absolutely not allowed. The thickness of the existing A.C. pavement may be up to 12- inches thick.
The minimum street pavement replacement section for West Street and Chapman Avenue shall be existing plus one-half inch or 6-inches AC/11-inches AB, whichever is greater. The minimum street pavement replacement section for Wilken Way , Eugene Street, Candy Lane, Holyoak Lane, Timmy Lane and Debbie Lane shall be existing plus one-half inch or 4-inches AC/7-inches AB, whichever is greater.
Payment for replacement of pavement section shall be included in the unit prices paid for the various items of work, which caused such pavement section removal and no additional compensation will be allowed. Said payment shall include full compensation for furnishing all labor, materials, tools, equipment and incidentals and performing all the work involved
SECTION 7 - SPECIAL PROVISIONS (Continued)
- 94 -
May 2023
in replacing AC/ AB, street areas and areas damaged by construction and no additional compensation will be allowed.
ARTICLE 18 – CLEARING AND GRUBBING, REMOVALS AND RELOCATIONS Clearing and grubbing shall conform to the provisions of Section 300 of the Standard Specifications with the following modifications:
Clearing and grubbing shall include, but not be limited to the following:
1. Project mobilization/demobilization
2. Removal and disposal of trees and shrubs, all natural and artificial objectionable materials such as logs, upturned stumps, roots of downed trees, brush, grass, plants, weeds and all other surface materials within the limits of construction area.
3. Tree branches, which may interfere with normal construction, shall be trimmed or removed.
If tree branch is to be removed, it shall be cut off to the boles in a workmanlike manner.
The CONTRACTOR shall remove additional tree branches under the direction of the Engineer, in such a manner that the tree will present a balanced appearance. Scars resulting from the removal of branches shall be treated with a heavy coat of tree sealant approved by the Engineer.
4. Saw cut and removal of existing concrete structures including, but not limited to curb and gutter, median curb, cross gutter, spandrel, sidewalks, drainage channel, the removal of K- markers and relocation of traffic signs.
5. Grading, fill material, and compaction of fill material in the parkway areas, drainage channel and areas behind sidewalk.
6. Saw cutting and removal of existing asphalt concrete, aggregate base, native soil, PCC and reinforced PCC pavement as required to complete the project.
7. Abandonment of existing water service connections at the water main.
Payment for furnishing all labor, equipment, materials, tools, and incidentals used in performing clearing and grubbing and as mentioned in this Article shall be considered as included in the lump sum price paid for Clearing and Grubbing, including Mobilization and Demobilization, and no additional compensation will be allowed.
Tree Roots Removal
Work shall consist of removal of existing tree roots in conformance with Section 300 of the Standard Specifications. The CONTRACTOR shall be responsible for obtaining a suitable disposal site for this material and shall, upon request, file with the Engineer the written consent of the Owner of the property upon which he intends to dispose of such material.
Removal shall consist of removing tree roots 1-1/2 inches in diameter and larger.
SECTION 7 - SPECIAL PROVISIONS (Continued)
- 95 -
May 2023
Holes resulting from the removal of tree roots shall be backfilled with soil from the surrounding area the same day the tree roots are removed and compacted to a minimum relative compaction of ninety percent (90%).
All removed tree roots shall be removed from the project site the same day.
Stockpiling of materials within the right-of-way, City parking lots, or other City-improved property shall not be allowed unless approved by the Engineer in writing.
Tree roots shall be removed in such a manner as not to injure or damage adjacent improvements, which are to remain in place. The CONTRACTOR shall not remove or damage fences adjoining property outside of the contract limits or City right- of-way. The CONTRACTOR shall exercise care in the protection of said fences and shall repair any damage caused by his operations.
No burning of materials will be permitted on the project site.
Payment for removal of existing tree roots shall be considered as included in the lump sum bid for Clearing and Grubbing, including Mobilization and Demobilization. It shall include full compensation for all labor, tools, equipment, incidentals, disposal of resulting material and for doing all the work involved in tree roots removal as required in the field, per these Special Provisions and as directed by the Engineer, and no additional compensation will be allowed.
Irrigation System Relocation
All irrigation systems disturbed by the construction operation shall be relocated to behind the right- of-way line. Relocated systems shall be operable and provide full coverage of the areas serviced by the system.
Existing system components may be reused as much as possible. However, new materials may be required to create a complete and working system and the expense shall be borne by the CONTRACTOR. Acceptability of the relocated system will be judged by its performance as described above.
The CONTRACTOR shall bear the cost of replacement of any parts lost or damaged during the construction operations.
Payment for irrigation system relocation shall be considered as included in the lump sum price bid for Clearing and Grubbing, including Mobilization and Demobilization, and no additional compensation will be allowed.
Clearing, grubbing, miscellaneous removals, and relocations shall be paid for under the lump sum item for Clearing and Grubbing and shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals, and for performing all the work involved in clearing, grubbing, removing, relocating and disposing of all the resulting materials. It also includes the removal of cross gutters, spandrel, curb and gutter, side walk, drive approach, PCC, abandon existing water services at main, replanting and reseeding, as shown on the Plans, as required in the field, as specified in these Specifications and Special Provisions, and as directed by the Engineer.
SECTION 7 - SPECIAL PROVISIONS (Continued)
- 96 -
May 2023
ARTICLE 19 - SHEETING, SHORING, AND BRACING
All trenches and other excavation, shall be adequately shored, sheeted, or braced to furnish safe working conditions and ample protection of the work and adjacent utilities, structures, and traffic.
Shoring may also be required to provide for the temporary traffic lanes. The CONTRACTOR shall also furnish and place at his own expense, additional sheeting, shoring and bracing not shown on the plans, but required to protect newly-built work and all adjacent utilities and neighboring structures from damage and to comply with all rules, orders, and regulations of the Division of Industrial Safety Department of Industrial Relations of the State of California. Engineered shoring plans signed by a registered structural engineer, State of California, shall be included in the shop drawings.
Where conditions permit, and only as approved by the Engineer, a sliding shield may be used in lieu of the specified sheeting in areas where sheeting is not required for traffic safety. However, the design of a sliding shield shall be approved by Division of Industrial Safety Department of Industrial Relations of the State of California prior to use.
Bracing shall be arranged so as not to place a strain on portions of completed work until the construction has proceeded far enough, in the opinion of the Engineer, to provide ample strength.
Sheeting and bracing may be withdrawn and removed at the time of backfilling, but the CONTRACTOR shall be responsible for all damage to newly built work, and adjacent structures.
Any damage to new or existing utilities or structures, whatsoever, occurring due to failure, lack of or improper sheeting or bracing shall be repaired by the CONTRACTOR at his own expense.
In addition, the CONTRACTOR shall submit to the CITY a copy of the CAL OSHA permit along with a detailed plan showing the design of shoring, bracing, sloping or other provision to be made for worker protection in accordance with Section 6422 of the Labor Code. If such plan varies from the shoring system standards established by the State of California Construction Safety Orders, a registered Civil or Structural Engineer shall prepare, wet stamp and sign the plans. The safety of the shoring, bracing, or protection installed or provided is the responsibility of the CONTRACTOR. The CONTRACTOR and his Engineer shall in no way be relieved of their legal or professional responsibilities by CITY's acceptance of shoring plans for safety of excavations.
The CONTRACTOR shall take special precautions near water main and appurtenance, sanitary sewer, sewer manholes, and curb and gutter because of the sandy soil encountered and the proximity to the sewer trench. If the water main, sewer line, manholes, curb and gutter that closely parallel the trench slough into the trench, all repairs will be at the CONTRACTOR's expense.
Full compensation for sheeting, shoring and bracing and for complying with all requirements of this Article shall be included in the price bid per linear foot of Water Pipe (Bid Items 2, 3, 4 & 5) and shall include full compensation for furnishing all labor, tools, equipment, materials, incidentals, and doing all work involved and no additional compensation will be allowed.
SECTION 7 - SPECIAL PROVISIONS (Continued)
- 97 -
May 2023
ARTICLE 20 - PIPELINE AND STRUCTURE EXCAVATION, BACKFILL AND TRENCH
BOTTOM PREPARATION
Excavation and haul away shall be performed in conformance with the applicable portions of Sections 300, 301, and 306 of the Standard Specifications with the following modifications:
All trenches for water lines shall be backfilled immediately after the pipe has been laid and inspected, and as soon as permitted under the specifications.
For this project, CONTRACTOR shall regulate his rate of excavation so that the length of open trench shall not exceed 300 feet unless otherwise approved by the Engineer.
Open trench, as referred to herein, is defined as all excavations made for the permanent installations required on the project, which have not been completely backfilled, as required elsewhere in these specifications and in which either temporary or permanent paving has not been placed, except as otherwise specified in these specifications.
For cases where the area surrounding the trench is to be resurfaced with asphalt concrete under this contract, and on the course under the wearing surface that are subject with vehicular traffic, such course shall be constructed so as to, in the opinion of the Engineer, provide smooth-riding qualities at the posted speed limit and shall not be a hazard to vehicular traffic.
In all cases, surfacing must provide a smooth ride quality and be maintained as such until final surfacing.
Additional lengths of open trench may be permitted by the Engineer for such circumstances as unusual dewatering operations, setting of piles in advance of excavation, or in the event of unforeseen conditions, should it be considered to be in the best interest of the CITY.
All open trenches shall be surrounded by barricades and concrete “K” railing. Unless otherwise specified, barricade shall be placed in accordance with the "MODEL WORK AREA TRAFFIC CONTROL HANDBOOK (WATCH)" as prepared by the Uniform Ordinances and Practices Committee of the Southern California Chapter, American Public Works Association. Such open trench areas shall not be opened for vehicular use of the public until temporary or permanent pavement has been placed to provide a smooth surface for vehicular travel. Areas that are opened for use of the public shall be maintained by the CONTRACTOR to provide a smooth surface until the final wearing surface is placed.
Failure by the CONTRACTOR to comply with the limitations specified herein, or as may be specifically authorized by the Engineer, may result in a written order from the Engineer to halt progress of the work until such time as compliance with this subsection has been achieved and the work can be prosecuted in an orderly sequence of operations. All costs to secure and maintain the work site to meet public safety and traffic control requirements of these specifications shall be borne by the CONTRACTOR.
SECTION 7 - SPECIAL PROVISIONS (Continued)
- 98 -
May 2023
All pipe zone backfill shall meet or exceed S.E. 30, and shall be thoroughly compacted by tamping or vibrating and may be jetted with water, working from the bottom of the trench upward to the level at least twelve inches (12") above the top of the pipe. Cohesive backfill materials above 12” from top of pipe shall be moistened to optimum moisture content and each layer solidly compacted with the proper tools so as not to injure or disturb the pipe. Cohesive backfill shall not be compacted by flooding or jetting.
All materials not suitable shall become the property of the CONTRACTOR and shall be disposed of off the project site, in accordance with the provisions of Section 300 of the Standard Specifications.
Payment for the disposal of the not suitable material off site and additional placement of pipe zone materials meeting or exceeding S.E. 30 shall be paid at the unit price bid per ton for additional pipe zone materials and disposal of not suitable materials and shall include full compensation for furnishing all labor, materials, tools, equipment, and incidentals for removal, transport, and disposal as required and as directed by the Engineer.
Payment for excavation, backfill and trench bottom preparation shall be paid at the price bid per linear foot of Water Pipe (Bid Items 2, 3, 4 & 5), and no additional compensation will be allowed.
The Trench bottom shall be compacted to a minimum density of not less than ninety percent (90%) of maximum density at optimum moisture content. Should the Soils Technician determine in the field that this is not possible, the Engineer will direct the CONTRACTOR to over-excavate and place additional bedding materials as described in Section 7, ARTICLE 21 of these provisions and as shown on the plans. Additional bedding for subgrade stabilization shall not be measured as part of the standard pipe bedding per detail on plans.
ARTICLE 21 - ADDITIONAL OVER- EXCAVATION AND 3/4” (INCH) CRUSHED ROCK
BEDDING
No provision in this Article shall relieve the CONTRACTOR from properly dewatering and preparing the trench bottom as specified in other Articles in this document. Any soft, spongy, uncompactable or unstable material in the bottom of the trench, per the Soils Technician, shall be removed to a depth up to 18” (inches) and replaced with 3/4 -inch crushed rock and tamped to provide a firm and stable foundation. Should this solution fail to stabilize the subgrade, in the opinion of the Engineer, all pipe laying operations shall stop until an acceptable solution to all parties is achieved. Any alleged resulting delays and costs shall be submitted by CONTRACTOR in accordance with Article 1 of the Special Provisions. CONTRACTOR shall minimize and mitigate any potential additional costs including, but not limited to, any resulting idle time for equipment and acknowledges that in order to do so, CONTRACTOR may be directed to continue operations in other locations.
Payment for the additional over-excavation, disposal of the material off site and placement of 3/4- inch crushed rock bedding shall be paid at the unit price bid per ton for 3/4-inch crushed rock used and shall include full compensation for furnishing all labor, materials (including water in the material at the time of weighing as provided in Section 9, "Measurement and Payment"), tools, equipment, and incidentals, and for doing all the work involved in constructing crushed rock
SECTION 7 - SPECIAL PROVISIONS (Continued)
- 99 -
May 2023
bedding complete in place, as required in the field, as specified in these special provisions, and as directed by the Engineer.
The CONTRACTOR shall furnish to the CITY Inspector a legible copy of a licensed weigh master’s certificate showing net weight of 3/4 -inch crushed rock in the truck load. The labeled certificate must be delivered to the CITY Inspector on-site on the same day that the 3/4-inch crushed rock is delivered. If any of these conditions are not met, the CITY will not allow payment for this item.
ARTICLE 22 – TEMPORARY OFFSET
Temporary off-set shall conform to the CITY standard specifications and plans (Detail 10, Sheet 9). PVC pipes shall be used for all temporary off-sets. Payment for temporary off-set shall be included in the contract unit price for the Temporary Off-Set and shall include full compensation for furnishing all labor, material tools, equipment, and incidentals, and performing all work involved. No additional compensation will be allowed.
ARTICLE 23 – FIELD WELDING OF STEEL WATER PIPE, STEEL WATER PIPE, CEMENT-
MORTAR PROTECTIVE LINING AND COATING FOR STEEL WATER PIPE AND STEEL
PIPE FLANGES
Welded steel pipe and fittings shall be manufactured of steel plate with a minimum of ¼-inch thickness for 6-inch pipe and larger. The suppliers shall be responsible to provide the minimum pipe thickness size as required by AWWA M11 corresponding with the required pressure shown on these plans and minimum thickness noted in these specifications. For all piping and fittings within the limits of the buildings or vaults, including all buried and above grade pipelines, the thickness shall not be less than 3/8 of an inch. Pipe materials, fabrication and shop testing of straight pipe shall conform to the requirements of the AWWA C200. All outlets, four inches in diameter and larger shall be provided with reinforcing designed for the water working pressure specified or shown. Shop drawings of all welded steel pipe and fittings, three inches in diameter and larger, shall be furnished in accordance with General Specifications. Unless otherwise provided, the nominal diameter shown shall be considered to be the inside diameter after lining.
Steel welding fittings shall conform to the requirements of ASTM A234.
Flanges where the design pressure is 275 psi or less shall conform either to AWWA C207 Class E or ASME B16.5 150-lb class. Where the design pressure is greater than 275 psi, flanges shall conform to AWWA C207 Class F or ASME B16.1, Class 250. All pipe and flanges shall be as noted on the plans. Flanges shall have flat faces. Pipe flanges shall be attached with bolt holes straddling the vertical axis of the pipe unless otherwise shown. Attachment of the flanges to the pipe shall conform to the applicable requirements of the above-referenced AWWA C207. All pipe flanges shall match the pipe inner diameter and the flanges shall be lined in accordance with steel welding fittings (ASTM A234).
All hand welding shall be done by welders certified in accordance with ASME “Boiler and Pressure Vessel Code”, Section IX or AWWA C206.
SECTION 7 - SPECIAL PROVISIONS (Continued)
- 100 -
May 2023
Welded steel pipe and fittings shall be lined with cement mortar in accordance with AWWA C205.
All buried welded steel pipe and fittings shall be coated with cement mortar in accordance with AWWA C205
At all times when pipe laying is not in progress, the open end of the pipe shall be closed with a tight-fitting cap or plug to prevent the entrance of foreign matter into the pipe. These provisions shall apply during the break periods as well as overnight. In no event shall the pipeline be used as a drain for removing water which has infiltrated into the trench. The Contractor shall maintain the inside of the pipe free from foreign materials and in a clean and sanitary condition. When the work requires and the size of the pipe allows entry of personnel into the pipe, the Contractor shall comply with all Federal and State regulations for confined space entry. Work inside pipelines shall not be undertaken until all the tests and safety provisions of the Code of Federal Regulations 1910.146 and the General Industry Safety Orders of the California Code of Regulations, Title 8, Section 5159 for confined space entry have been performed and the area is verified as safe to enter.
The pipe sections shall be laid in place to true alignment and grade in accordance with the plans. Special care shall be taken in placing the pipe and making the field joints.
Bell holes of ample size shall be dug where they are to be welded. Joints to be field-welded shall be done by welders certified for this Contract in accordance with AWWA C206.
When installing mortar-lined pipe, before the spigot is inserted into the bell, the bell end of the pipe shall be daubed with mortar containing 1 part lumnite cement of not more than 3 parts of sand, inserted into the bell and forced to the bottom of the bell. Excess mortar on the inside shall be swabbed out.
When installing mortar coated pipe, after the welding is completed and inspected by City, the outside annular space between pipe sections shall be completely filled with grout. The grout shall be poured in such a manner that all exposed portions of the metal joint shall be completely protected with cement mortar. Grout used on the outside of joints shall be mixture of 1 part of cement to 3 parts of sand, by weight, and shall be sufficiently fluid to permit to be poured into the joint space. It shall be poured down one side of the pipe and allowed to flow up the other side. The outside mortar joints shall be properly formed by the use of heavy-duty diapers.
Where butt-straps or closure pieces are used, both the interior and exterior surfaces of the butt- straps or closure pieces shall be given a coating equivalent to the factory-applied cement mortar or enamel coating of the adjoining pipe sections. Any exterior cement mortar coating in such cases shall be reinforced with wire mesh. Any interior cement mortar lining shall be similarly reinforced where the exposed length of the butt-strap or closure piece, as measured between the ends of connected pipe section, exceeds 4-inches
Payment for connection to welded steel main including welding on site, lining, coating and all labor, equipment, machinery and material necessary to complete this work shall be included in the price bid per each location (Bid Item 10).
SECTION 7 - SPECIAL PROVISIONS (Continued)
- 101 -
May 2023
ARTICLE 24 – PCC IMPROVEMENTS
All PCC construction work for this article shall conform to Sections 15, 73 and 90 of the Caltrans Standard Specifications. Sub-grade materials shall be compacted to a minimum relative compaction of 95 percent.
All PCC removal work shall conform to Sections 15 of the Standard Specifications and shall be included as part of the related PCC construction item. Contractor shall extend concrete removal limits to the nearest joint line or score line unless otherwise directed by the Engineer. The use of pavement breaking equipment (stomper) is not permitted. No additional compensation will be allowed therefore.
All excavations shall be backfilled as soon as permitted under the specifications so that when the job is closed for the day, the open excavation will be kept at a minimum and adjacent utilities will receive maximum backfill support.
The Contractor shall also cut and remove any tree roots encountered within construction limits to at least six (6) inches below the subgrade. Removal of roots shall be included under Mobilization Including Clearing and Grubbing. No additional compensation will be allowed.
Removal of excess concrete to create tree well size as shown on plans shall be included under Mobilization Including Clearing and Grubbing and No additional compensation will be allowed.
PCC improvements shall be constructed per the following standard plan and per these special provisions:
PCC Improvement Item Garden Grove Std Plan
Sidewalk B-106
Curb and Gutter B-113
Alley and Alley Apron B-118
Cross Gutter /Spandrel/Splash
Pad
B-119
Drive Approach B-121
Curb Ramp / Curb Ramp CALTRANS Std Plan
A88A
Payment for aggregate base and AC slot patch shall be included as part of the related PCC construction item. No additional compensation will be allowed therefore.
Concrete mix design shall be per SSPWC (latest edition) Section 201- 1 "Portland Cement Concrete", 303-5 and modified as follows:
All concrete shall have a maximum slump of 4” and the same brand, type and source of cement and aggregate shall be used for all Portland Cement Concrete.
No color compounds, etching chemicals or other related construction materials will be allowed to migrate onto adjacent AC pavement surfaces or to flow into adjacent drainage inlets. The Contractor
SECTION 7 - SPECIAL PROVISIONS (Continued)
- 102 -
May 2023
shall be required to mask the adjacent AC pavement areas and place an impermeable fabric secured by gravel bags across the openings of all catch basin openings prior to beginning any PCC improvement work with the potential to generate hazardous materials or otherwise negatively affect the local water quality.
Contractor shall paint house addresses where contractor removed existing curb and constructed new curb.
Contractor shall paint curb face and top of curb red where contractor removed existing curb and constructed new curb.
Payment for Remove Existing and Construct PCC Curb and Gutter, Type C-8 shall be made at the Contract unit price bid per Linear Foot (Bid Item 25) shall include full compensation for furnishing all labor, materials, tools, equipment and incidentals necessary to complete work, including all saw cutting and related PCC removals and excavation, subgrade preparation, compaction, grading, backfill, formwork, and aggregate base material and placement. No additional compensation will be allowed therefore.
Payment for Remove Existing and Construct New PCC Sidewalk, Cross Gutter and Spandrel shall be made at the Contract unit price bid per Square Foot (Bid Item 26, 27 & 28) and shall include full compensation for furnishing all labor, materials, tools, equipment and incidentals necessary to complete work, including all saw cutting and related PCC removals and excavation, subgrade preparation, compaction, grading, backfill, aggregate base material placement and compaction, formwork and adjustment of utility covers to the new grades. No additional compensation will be allowed therefore.
Payment for grind existing PCC shall be included in the bid item Mobilization/Demobilization including Clearing and Grubbing as shown in the bid proposal.
Minor Concrete Structures:
Catch basin inlet structures with outlet connection, local depression, junction structures (pipe and box), pipe to box and other transition structures, reinforced concrete box structures, junction structure with manhole, sewer manholes, storm drain manholes, and concrete collars shall be classified as minor structures and shall conform to Sections 201 and 303 of the Standard Specifications with the following additions:
The sizes and placement of all reinforcement shall be as shown on the standard plans or plan details and no substitution shall be allowed unless otherwise directed by the Engineer.
Curing of the minor structures shall be by any method allowed in Section 303-1.10 of the Standard Specifications. Full compensation for curing concrete shall be considered to be included in the contract price per each item and no additional compensation will be allowed.
Payment for metal frame and cover used in the minor concrete structures shall be considered to be paid for in the contract price per each item and no additional compensation will be allowed.
SECTION 7 - SPECIAL PROVISIONS (Continued)
- 103 -
May 2023
Precast items set on base constructed of cast-in-place concrete shall have either the lower course of precast units set in the concrete base prior to the time of the initial set of the base concrete and shall be worked so that the precast items are firmly embedded in the upper surface of the base concrete, or the precast items shall be set on a full bed of cement mortar. Each precast concrete manhole and/or vault unit shall be set on a full bed of cement mortar unless specifically indicated otherwise.
Precast units shall be subject to inspection both at the time they are delivered at the job site and again after they have been installed in the work. Any units showing evidence of full depth cracks, large chips, exposed reinforced steel, or other imperfections which would impair the usefulness or structural integrity of the items to be constructed will be rejected and shall be removed from the job site by the CONTRACTOR and replaced with acceptable units, all at the expense of the CONTRACTOR.
Manhole frames and covers shall be adjusted to the ultimate finish surface grade upon completion of work. In the event finish surface is higher than the interim pavement surface the CONTRACTOR shall taper the pavement surface to provide a smooth riding surface until ultimate finish surface is placed. Compensation for manhole or vault frame and covers adjustment shall be included in the contract bid price per each item.
Payment for minor concrete structures shall be made per each item or as specified in these special provisions. Said payment shall include full compensation for furnishing all labor, materials (including concrete, reinforcing steel, metal frame and cover, form work, dowels, and any other miscellaneous iron work or steel required), cast iron pipe, excavation, backfill, backfill compaction, tools, equipment, removal and replacement in kind of existing sidewalks and curbs, incidentals, shoring and for performing all work shown on the plans, and no additional compensation will be allowed.
Structures:
Structures shall conform to Section 303 of the Standard Specifications. Reinforcing steel shall be grade 60. Concrete to be used for all manholes shall be a high early strength (7 sack mix with 1% calcium chloride), attaining a 7-day compressive strength of 3,000 psi. The CONTRACTOR shall submit a copy of the certified concrete mix design to the Engineer. No concrete shall be placed prior to the Engineer’s written approval of the mix design.
The CONTRACTOR shall make every reasonable effort to construct these structures as expeditiously as possible. Additional cement shall be added to the concrete, not exceeding 700 lb./cy to obtain high early strength, attaining a 7-day compressive strength of 3,000 psi.
Temporary bracing shall be placed within the structure to permit backfilling after concrete has set up.
Payment for Structures will be made at the contract price per each item, and includes the structures, complete in place including labor, materials, excavation backfill, and additional cement, when necessary.
SECTION 7 - SPECIAL PROVISIONS (Continued)
- 104 -
May 2023
ARTICLE 25 - STRUCTURE BACKFILL
Structure Backfill shall conform to the provisions of Section 300 of the Standard Specifications except as modified herein.
All excavations shall be backfilled as soon as permitted under the specifications so that when the job is closed for the day the open excavation will be kept at a minimum and adjacent utilities will receive a maximum backfill support.
Payment for Structure Backfill and compaction, protection and barricading, and for complying with all requirements of this Article shall be included in the unit price paid for the specified items of construction requiring structure backfill, and shall include full compensation for furnishing all labor, tools, equipment, and materials and doing all work involved, and no additional compensation will be allowed.
ARTICLE 26 - MANHOLE AND WATER VALVE CAN ADJUSTMENTS
All adjustment work shall be performed in accordance with Section 301-1.6 and 302-5.8 of the Standard Specifications with the following modifications and additions:
I. Water Valve Can Adjustment and/or Reconstruction
Existing water valve cans disturbed by the construction operation or as directed by the Engineer, (due to the variations in trenching style, no attempt on the plans is made to indicate extent of valve can work) are to be adjusted/or reconstructed to finished grade in accordance with the applicable portions of the Standard Specifications and these Special Provisions.
Water valve can reconstruction and/or adjustment shall meet the City of Garden Grove Public Works Department specifications for water systems, specifically Standard Plan B-752 and 753 Gate Valve Can Assembly.
Adjust shall mean to lower or raise existing valve cover and valve can cover to final grade of pavement. When necessary, replace and include in the bid price the cost of new valve can assembly, which is available and can be purchased from Garden Grove Water Department.
Payment for adjusting and/or reconstructing the water valve can to finished grade shall be included in the unit prices paid for the various items of work in the bid proposal. Said payment shall include full compensation for furnishing all labor, materials, tools and equipment and doing all the work involved in reconstructing and/or adjusting the valve cans to grade, including all excavation, backfill and replacement of pavement section, and no additional compensation will be allowed.
SECTION 7 - SPECIAL PROVISIONS (Continued)
- 105 -
May 2023
ARTICLE 27 – ROADWAY EXCAVATION AND SUBGRADE PREPARATION (OUTSIDE OF WORKING TRENCH –T-CUT)
Excavation and haul away shall be performed in conformance with the applicable portions of Sections 9, 15 and 19 of the Standard Specifications with the following modifications:
Roadway excavation shall include the areas shown on the plans or as determined in the field by the engineer. These excavations shall be to a depth necessary to permit placement of the new pavement section and other structures as shown on the Contract plans.
At the time of construction, additional areas of the street may have failed. These areas shall be removed and reconstructed and as directed by the Engineer. The calculated volume will be added or deleted to the original bid quantities in cubic yards.
The Contractor shall excavate a length of section of roadway not to exceed the amount of removal and placement of aggregate base and asphalt concrete base course that can be completed within the same working day.
Where a join is to be made between existing and new pavement sections, the Contractor shall saw cut the existing section by a method which will leave a uniform pavement and undisturbed base. The preparation of existing pavement, surfacing, or base which is to be either fully or partially salvaged shall be done as shown on the plans or as directed by the Engineer.
The use of pavement breaking equipment (stomper) is not permitted. The cost of saw cutting the existing pavement shall be considered as included in the unit price per cubic yard of roadway excavation.
All excavations shall be backfilled as soon as permitted under the specifications so that when the job is closed for the day, the open excavation will be kept at a minimum and adjacent utilities will receive maximum backfill support.
Subgrade preparation shall conform to the provisions listed under Section 19 5.03 of the Standard Specifications with the following modifications:
When the original ground within 0.5 foot of the grading plane for a width equal to the width of the grading plane has a relative compaction of less than 95 percent, the subgrade shall be prepared and compacted in accordance with the provisions of Section 19 of the Standard Specifications.
When the original ground in the shoulder areas within 0.5 foot of finished grade has a relative compaction of not less than 90 percent, said areas shall be compacted to a relative compaction of not less than 95 percent.
Backfill shall be carried up simultaneously and compacted in uniform layers.
The Contractor shall also cut and remove any tree roots encountered within construction limits to at least six (6) inches below the subgrade.
When it becomes necessary to overexcavate, due to buried concrete structures, oversize rocks or boulders, contaminated materials, any soft, spongy or pumping subgrade and other interfering
SECTION 7 - SPECIAL PROVISIONS (Continued)
- 106 -
May 2023
objects, the Contractor shall then overexcavate those areas to a depth and width to be determined by the Engineer. Payment for overexcavation shall be determined from the theoretical volume in cubic yards of overexcavation added to the Contract bid item of roadway excavation. If overexcavation at subgrade is necessary, the Contractor shall not be compensated for the time required to remove undesirable material(s). The time, if required, shall be a part of the Contract bid item of roadway excavation and no additional compensation will be allowed therefore.
Aggregate base or asphalt concrete materials shall be used in backfilling of voids left by said removals and quantities will be added to the Contract bid item of aggregate base or asphalt concrete.
The relative compaction of all embankment areas, except shoulder areas, within 0.5 feet of the grading plane shall not be less than 90 percent in lieu of the provisions of Section 19-6.02 of the Standard Specifications requiring not less than 95 percent relative compaction with 2.5 feet of finished grade.
The cost of making compaction tests shall be borne by the City when results indicate compliance with the specifications; otherwise, the expense of such tests shall be borne by the Contractor. All compaction tests shall be conducted by Caltrans Certified Laboratory.
Payment for Roadway Excavation shall be made at the contract unit price per cubic yard and shall include full compensation for furnishing all labor, materials, tools, equipment and incidentals used in subgrade preparation, compaction, grading, embankment and backfill, removal, disposal of surplus earth, asphalt concrete, and aggregate base, stockpiling the suitable surplus excavated material, backfilling any suitable surplus material, and backfill and grade preparation, and no additional compensation will be allowed therefore.
The Contractor is also advised that in the excavation areas abandoned utility lines, hidden and abandoned concrete structures, slurry concrete encasement, abandoned storm drain and sewer pipes, concrete slabs and full depth asphalt of unknown thickness may be encountered that will need to be removed and disposed. The Contractor, therefore, shall include in his/her bid the costs for handling, removing and disposing of the above-mentioned conditions in the Contract price per cubic yard of roadway excavation and no additional compensation will be allowed therefor.
II. Manhole Adjustment and/or Reconstruction
Existing manholes disturbed by the construction operation or as directed by the Engineer, are to be adjusted or reconstructed to finished grade in accordance with the applicable portions of the Standard Specifications and these Special Provisions. (Due to the variations in trenching style, no attempt on the plans is made to indicate extent of manhole adjustment work)
Manhole adjustment or reconstruction shall be done per the Garden Grove Sanitary District, Standard Plan S-100 and S-103, and/or the Orange County Sanitation City Standard Drawing (S-055) as required.
In areas to be resurfaced, the method of adjusting shall be as follows:
SECTION 7 - SPECIAL PROVISIONS (Continued)
- 107 -
May 2023
i. Upon completion of resurfacing, circular holes shall be cut in the wearing surface where the manholes exist. Circular hole shall be 24-inches greater than the manhole cover.
ii. The manhole frame and cover shall then be raised to the proper finished grade, and 12-inch thickness of 470-C-2500 concrete with a maximum slump of 4” shall be placed around the periphery of the manhole to within two inches (2") of finished grade. A 2-inch thickness of asphalt concrete shall then be placed on the PCC to bring surface to finished grade. The requirements for 470-C-2500 concrete can be found in Section 201-1 of the Standard Specifications.
Payment for adjusting or reconstructing manholes due to construction operations to proposed finished grade shall be included in the prices paid for the various items of work in the bid proposal. Said payment shall include full compensation for furnishing all labor, materials, tools and equipment and doing all the work involved in adjusting or reconstructing the manhole to grade, including all excavation, backfill, replacement of PCC and pavement section, and no additional compensation will be allowed.
ARTICLE 28 - AGGREGATE BASE
Aggregate base shall conform to the provisions for “Crushed Aggregate Base” as specified in Section 200-2.2 of the Standard Specifications and these Special Provisions. Processed miscellaneous base or asphalt containing base will not be allowed.
Sand equivalent by Test Method No. California 217 shall be a minimum of SE 50.
At the time aggregate base is spread, it shall have a moisture content sufficient to obtain the required compaction. Such moisture shall be uniformly distributed throughout the material.
Aggregate base material shall be spread upon prepared subgrade by means of approved spreading devices which will deposit a uniform layer. After spreading as specified above, the material shall be shaped to the requirements of Section 301-2.2 of the Standard Specifications.
Motor graders may be used for the aforementioned shaping. Tailgate spreading by dump trucks of material will not be permitted except for spot dumping and in areas not readily accessible to approved spreading devices.
Relative compaction of the aggregate base material shall not be less than 95 percent.
Payment for aggregate base material and work at the working trench and t-cap/t-cut shall be included in the contract unit price bid per linear foot of Water Pipe (Bid Item 2, 3, 4 & 5) with the other contract items and no additional compensation will be allowed.
ARTICLE 29 - ASPHALT CONCRETE
The asphalt concrete material used for all areas shall comply with the requirements of the Standard Specifications for Public Works Construction, 2018 (or latest edition). The specific type
SECTION 7 - SPECIAL PROVISIONS (Continued)
- 108 -
May 2023
of material used for each type of construction shall comply with the table below. The contractor may supply asphalt concrete materials containing Recycled Asphalt Pavement (RAP) in accordance with the Standard Specifications except the maximum percentage of RAP shall be limited to 15 percent of the mix for base course asphalt only. No RAP will be allowed in the surface course mix. Asphalt binder content in the pavement shall be determined by the asphalt mix design requirements of the SSPWC, Section 203-6.2, 2018.
Requirement for Asphalt Concrete Material Type
Leveling
Course
Surface
Course
Base
Course
Pavement Thickness (inches): <1 >1 and ≤3 >3
SSPWC Material Type
(for use in C2 or ARHM Surface Course) : DPG* C2**
ARHM*** -
SSPWC Material Type
(for use in AC Base, Note:
Min. base course thickness is 3”):Φ
- - BPG****
This work shall consist of furnishing and mixing aggregate binder at a central mixing plant and spreading and compacting the mixture to the dimensions indicated on the Plans, shown in these Special Provisions and to the grades as established by the Engineer.
Asphalt concrete shall be Type III-B2 with no reclaimed asphalt pavement (RAP) for base course (unless approved by the Engineer/Inspector) and Type III-C3 with no reclaimed asphalt pavement (RAP) for surface course.
Asphalt concrete shall be ¾-inch maximum course for base course and ½-inch maximum course for surface courses and shall conform to the applicable portions of Section 39 of the Standard Specifications with the following modifications:
The ¾-inch mineral aggregate for the base course and the ½-inch aggregate for the surface course shall conform to the following grading requirements:
Base Course (3/4" aggregate) Surface Course (1/2" aggregate) Sieve Individual Moving Sieve Individual Moving
Sizes Test Result Average Sizes Test Result Average
1" 100 100 3/4" 100 100
3/4" 87-100 90-100 1/2" 89-100 95-100
3/8" 50-80 60-75 3/8" 70-94 75-90
No. 4 30-60 40-55 No. 4 44-72 50-67
No. 8 22-44 27-40 No. 8 32-60 38-55
No. 30 8-26 12-22 No. 30 14-38 18-33
No. 200 1-8 3-6 No. 200 0-10 4-8
Asphalt % ±5.4 Asphalt % ±5.8
SECTION 7 - SPECIAL PROVISIONS (Continued)
- 109 -
May 2023
The Surface Course asphalt concrete shall be dense graded with 2% rubber latex. The following requirements shall also apply:
1. Grade for Asphalt binder shall normally be PG-64-10.
2. The County of Orange RDMD Materials Lab or approved lab will determine the exact asphalt percentage after the supplier is known.
3. Two percent (2%) rubber latex solids by weight of the asphalt cement shall be added at the Pub Mill with the asphalt cement during the mixing cycle.
4. The CONTRACTOR shall submit the certified mix design to the City of Garden Grove for approval prior to use. No asphalt concrete shall be placed without the Engineer’s written approval of the mix design.
The Base Course shall have a viscosity grade of PG-64-10 or as approved by the Engineer.
The CONTRACTOR shall submit the certified mix design to the City prior to placement. The base and leveling shall be spread and shaped in layers, and surface courses shall be spread and shaped in layers, with an asphalt-paving machine. The base course must be allowed to cool to 150° maximum before placement of the finish course shall begin. Each lane of the surface course, once commenced, shall be placed without interruption.
Asphalt shall not be heated during the process of its manufacture or during construction to cause injury as evidenced by the formation of carbonized particles.
During the process of the work no change affecting the uniformity of the asphalt shall be made in either the source of crude stock or the method of manufacture without notifying the Engineer of such proposed change and obtaining his approval.
Tarpaulins shall be used to cover all loads of asphalt concrete from plant to project site.
A steam refined paving asphalt of viscosity grade PG-64-10 shall be used as the asphalt binder.
This shall conform to the provisions of Section 203 of the Standard Specifications, amended as follows: The viscosity grade of paving asphalt will be PG-64-10 determined by the Engineer.
Grades of asphalt shall conform to the requirements set forth in the following table:
SECTION 7 - SPECIAL PROVISIONS (Continued)
- 110 -
May 2023
a. For use as asphalt rubber base stock for high mountain and high desert area. b. The Engineer will waive this specification if the supplier is a Quality Supplier as defined by the Department's "Certification Program for Suppliers of Asphalt."
c. The Engineer will waive this specification if the supplier certifies the asphalt binder can be adequately pumped and mixed at temperatures meeting applicable safety standards. d. Test the sample at 3°C higher if it fails at the specified test temperature. G*sin(delta) shall remain 5000 kPa maximum
e. "RTFO Test" means the asphaltic residue obtained using the Rolling Thin Film Oven Test, AASHTO Test Method T240 or ASTM Designation: D 2872
f. "PAV” means Pressurized Aging Vessel
Performance Grade Asphalt
Specification
Property AASHTO Grade
Test PG PG PG PG PG
Method 58-22 a 64-10 64-16 64-28 70-10
Original Binder
Flash Point, Minimum °C T48 230 230 230 230 230
Solubility, Minimum % b T44 99 99 99 99 99
Viscosity at 135°C, c T316
Maximum, Pa-s 3.0 3.0 3.0 3.0 3.0
Performance Grade Asphalt
Dynamic Shear, T315
Test Temp. at 10 rad/s, °C 58 64 64 64 70
Minimum G*/sin (delta), kPa 1.00 1.00 1.00 1.00 1.00
RTFO Test, e T240
Mass Loss, Maximum, % 1.00 1.00 1.00 1.00 1.00
RTFO Test Aged Binder
Dynamic Shear, T315
Test Temp. at 10 rad/s, °C 58 64 64 64 70
Minimum G*/sin (delta) , kPa 2.20 2.20 2.20 2.20 2.20
Ductility at 25°C T51
Minimum, cm 75 75 75 75 75
PAV f Aging, R28
Temperature, °C 100 100 100 100 110
RTFO Test and PAV Aged Binder
Dynamic Shear, T315
Test Temp. at 10 rad/s, °C 22 d 31 d 28 d 22 d 34 d Maximum G*sin(delta) , kPa 5000 5000 5000 5000 5000
Creep Stiffness, T313
Test Temperature, °C -12 0 -6 -18 0
Maximum S-value, MPa 300 300 300 300 300
Minimum M-value 0.300 0.300 0.300 0.300 0.300
SECTION 7 - SPECIAL PROVISIONS (Continued)
- 111 -
May 2023
Construction Methods
Prior to paving, all vertical faces shall be cleaned and tacked with SS-1h emulsified asphalt prior to the placement of the new asphalt concrete materials.
Placing Asphalt Concrete Material
Asphalt paving shall be applied to the thickness shown on the Plans, as listed above, or per the applicable permit. Asphalt paving shall be installed in accordance with Section 302-5 of the Standard Specifications for Public Works Construction, 2018 (or latest edition) and these Special Provisions. Trench resurfacing shall conform to all applicable portions of Section 306 of the Standard Specifications.
Asphalt concrete base course shall be placed in lifts having a maximum depth of four (4) inches.
The street shall be paved such that the asphalt surface is 3/8” higher than the concrete gutter to facilitate the flow of water from the street to the gutter.
Should the methods and equipment furnished by the CONTRACTOR fail to produce a layer of asphalt concrete conforming to the requirements, including straight-edged tolerance, of Section 302-5.6, "Rolling," of the Standard Specifications, the paving operations shall be discontinued and the CONTRACTOR shall modify his equipment or furnish substitute equipment.
Measurement shall be in tons of Asphalt Concrete (“A.C.”). The CONTRACTOR shall furnish a legible copy of a licensed weigh master’s certificate showing truckload net weight of asphalt concrete to the CITY Inspector. The labeled certificate must be delivered to the CITY Inspector on site on the same day that the asphalt concrete is delivered. If any of these conditions are not met, the CITY will not allow placement of delivered A.C. A.C. placed in excess of the required thickness will not be a part of the pay item. The compaction after rolling shall have a relative compaction of 95%. Prior to placement of asphalt concrete, a minimum 10-ton vibratory roller shall be used to compact the existing native materials and aggregate base to 95 percent minimum relative compaction. The asphalt concrete paving machine will have a vibratory plate in operation during all of the placement operations. In the case that the plate is non-operational the contractor will increase his thicknesses to include an additional 1/8 of an inch for each inch of asphalt concrete material placed
Payment for Asphalt Concrete work at the trench shall be as included in the contract unit price per linear foot for Water Pipe (Bid Item 2,3,4 & 5) construction, and shall include full compensation for furnishing all labor, materials (including aggregate, and asphalt binder), tools, equipment and incidentals, and for doing all work involved in furnishing, mixing, hauling, A.C. planing, placing, spreading, shaping and compacting the asphalt concrete, including automatic screed control with the necessary sensing devices, complete in place, as shown on the plans, as specified in these special provisions and as directed by the Engineer and no additional compensation will be allowed therefore.
SECTION 7 - SPECIAL PROVISIONS (Continued)
- 112 -
May 2023
ARTICLE 30 - PAINT BINDER / A.C. TACK COAT
Paint Binder shall conform to Sections 203, 302, and 400 of the Standard Specifications.
Paint Binder (Asphaltic Emulsion) shall be SS 1 type asphaltic emulsion and applied to conform to the provisions of Sections 203 and 302 of the Standard Specifications.
Asphalt concrete pavement that is constructed directly on existing pavement shall have a tack coat of either PG 64-10 paving asphalt at an approximate rate of 0.05 gallons per square yard or Grade SS-1h emulsified asphalt at an approximate rate of 0.05 to 0.10 gallon per square yard Uniform placement of tack coat on existing pavement shall immediately precede the placement of asphalt concrete. The surface shall be free of water, foreign material, or dust, when the tack coat is applied. To minimize public inconvenience, no greater area shall be treated in any one day than is planned to be covered by asphalt concrete during the same day, unless otherwise authorized by the Engineer.
A similar tack coat shall be applied to the surface of any course, if the surface is such that a satisfactory bond cannot be obtained between it and a succeeding course.
The contact surfaces of all cold pavement joints, curbs, gutters, manholes and the like, shall be painted with either Grade SS-1h emulsified asphalt or PG- 64-10 paving asphalt immediately before the adjoining asphalt concrete is placed.
Payment for paint binder and tack coat shall be included in the Contract unit price per linear foot of Water Pipe (Bid Items 2,3,4 & 5) construction. Said payment shall include full compensation for furnishing all labor, materials, tools, and equipment and incidentals and for doing all the work involved and no additional compensation will be allowed therefore.
ARTICLE 31 – SLURRY SEAL (EMULSION-AGGREGATE SLURRY)
The work hereon shall include, but not limited to, mixing asphaltic emulsion, aggregate, set-control additives and water and spreading the mixture on a surfacing or pavement where shown on the Plans, as specified in the Specifications and as directed by the Engineer.
The CONTRACTOR shall submit a signed original of a mix design covering the specific materials to be used before work commences. Previous laboratory reports covering the exact materials to be used may be accepted provided that they were made within six (6) months. Once the materials are approved, no substitution shall be permitted.
SECTION 7 - SPECIAL PROVISIONS (Continued)
- 113 -
May 2023
The laboratory report shall show the results of tests performed on individual materials, comparing their values to those required by these Specifications. The laboratory report shall include the following information on the slurry seal mixture:
Slurry Seal Consistency ISSA T106 2-3 cm
Excess Asphalt ISSA T109 50-70 gms/sq ft
Wet Stripping Test ISSA T114 Pass
Compatibility ISSA T115 Pass*
Quick Set Emulsion ISSA T102 Pass**
Wet Track Abrasion ASTM D3910 75 gms/sq ft max.
* Mixing tests must pass at the maximum expected temperature ** Using job aggregates
In addition, the laboratory report shall provide the information on the quantitative effects of moisture content in the unit weight of the aggregate (bulking effect), and the lab report shall clearly show the proportions of aggregate, mineral filter (minimum and maximum), additives and asphalt based on the dry aggregate weight.
Emulsion-aggregate slurry (slurry) shall be a stable mixture of emulsified asphalt, mineral aggregate, water, accelerator or retardant. Slurry materials, mix design, mixing equipment, spreading and application shall meet and conform to Sections 203-5 and 302-4 of the Standard Specifications with the following modifications and additions:
Emulsified asphalt shall be a cationic quick set type CQS-1h or equivalent at the option of the Engineer.
The materials shall be free from vegetable matter and other deleterious substance. Aggregate shall consist of 100% rock dust.
The CONTRACTOR shall schedule and coordinate the delivery of aggregate to the stockpile(s) such that: (1) deliveries originate at the plant and arrive at the stockpile site within normal working hours on the same calendar day, (2) delivery site and project name are explicitly stated on each delivery ticket, (3) successive deliveries on the same calendar day show the accumulative total for that day, (4) copies of all delivery tickets are delivered to the Engineer before the end of the working day, whereas any delivery tickets not so delivered may be rejected by the Engineer.
The grading of the combined aggregate and the percentage of emulsified asphalt shall conform to “Type II” as specified in Section 203-5.3 of the Standard Specifications.
Latex, such as “Ultra Pave 65 VC”, shall be added to the emulsified asphalt at the a sphalt plant at the rate of 2 parts latex to 100 parts emulsified asphalt by volume. Latex mixed on the emulsified asphalt shall be kept in a suspended state by an agitating mixer every three days.
Additives may be used to accelerate or retard the break-set of the slurry seal, or improved the resulting finished surface. The use of additives in the slurry mix (or individual materials) shall be made initially in quantities predetermined by the mix design with field adjustments if required, after prior approval by the Engineer.
SECTION 7 - SPECIAL PROVISIONS (Continued)
- 114 -
May 2023
Applied slurry seal shall support uncontrolled vehicular traffic within two (2) hours after application.
Slurry shall not adhere to and/or be picked up by the tires of vehicles, bleed, ravel separate or show other stress after two (2) hours of application. The CONTRACTOR shall ensure that the used type and amount of retardant for quick setting emulsion will not adversely affect the seal, and will compliance with the above requirement for supporting uncontrolled traffic within two (2) hour after application.
Payment for slurry seal shall be included in the contract price paid per square foot for the Slurry Seal Over Asphalt Concrete. Said payment shall include full compensation for furnishing all labor, materials, tools, and equipment and incidentals and for doing all the work involved and no additional compensation will be allowed.
ARTICLE 32 - TEMPORARY RESURFACING
Temporary resurfacing shall be placed over all backfill in streets or other areas where excavation was made through existing paving and in areas where the CONTRACTOR's operations have resulted in the removal of existing paving.
Temporary resurfacing shall be placed as soon as the backfill is densified to the required relative density or immediately when so directed by the Engineer. Prior to placing the temporary resurfacing, the foundation material (occupying space of permanent surfacing and base material therefore) for the temporary resurfacing shall be densified to produce a firm and unyielding surface, as determined by the Engineer. This shall be accomplished by blading and rolling with an 8-ton tandem roller if the trench is wide enough to accommodate the roller width, or rear wheels of a loaded 5-ton truck, heavy road grader or by other equivalent means acceptable to the Engineer, to a depth of three inches (3") below the grade of the existing pavement.
The subgrade shall be uniformly watered sufficiently to eliminate all dust, but not to such extent as to form mud or pools of water. The street and surrounding area shall be cleared of rubbish and debris. The street shall be swept and the surrounding area shall be cleaned thoroughly.
The temporary resurfacing shall then be spread over the prepared foundation material and rolled with an 8-ton tandem roller in such a manner that after rolling the temporary resurfacing shall present a smooth surface for traffic and shall not be less than three inches (3") in compacted thickness and shall be maintained free from bumps and depressions until permanent resurfacing is placed. The finished surface of said temporary resurfacing shall be flush with the adjoining pavement grade. Temporary resurfacing at major intersections and other critical locations may be greater than three inches (3") as directed by the Engineer.
Upon completion of all the above temporary resurfacing, the surface shall be immediately swept clean of all dust and debris created by this operation. Sweeping shall be done at all times in such a manner as to prevent creation of dust clouds and avoid accumulation of unreasonable amounts of dust on adjacent properties. After the temporary resurfacing has been placed, the CONTRACTOR shall furnish and operate a self-loading motor sweeper with spray nozzles and pick-up broom to clean the streets in the construction area daily.
SECTION 7 - SPECIAL PROVISIONS (Continued)
- 115 -
May 2023
The CONTRACTOR shall stockpile enough temporary resurfacing material on the job to insure a ready supply at all times for necessary repairs to the temporary resurfacing already placed.
The temporary resurfacing shall be left in place not more than 30 days unless otherwise permitted by the Engineer, and the permanent resurfacing including wearing surface shall be placed immediately following the removal of the temporary pavement.
Payment for temporary resurfacing conforming to the requirements of this Article shall be included in the bid prices paid for the various contract items of bid, which necessitated installation of temporary resurfacing for their construction under these specifications. No other compensation will be allowed.
ARTICLE 33 – TRAFFIC SIGNING, STRIPING, AND PAVEMENT MARKERS
This work shall consist of furnishing and placing markers, signing and striping to replace those removed as a result of the construction and as shown on the striping plan. This work shall be performed in conformance with the Standard Specifications, the current California Manual on Uniform Traffic Control Devices (MUTCD) and these Special Provisions.
Traffic control provided during installation of pavement markers shall conform to the Work Area Traffic Control Handbook (WATCH). A flashing arrow sign shall be used in conjunction with all other advance warning signs and delineation.
Type “A”, “AV”, “D” and “G” markers shall be placed as required. Fire Hydrant spotter Stimpsonite No. 88 Blue, or approved equal, shall be installed per manufacturer’s instructions and located as directed by the Engineer.
Striping shall confirmed to Section 210, “Paint and Protective Coatings”, and Subsection 310-5.6, “Painting, Traffic Striping, Pavement Markings, and Curb Markings”, of the Standard Specifications, the current California MUTCD, and these Special Provisions.
Paints for traffic striping shall be either rapid dry white conforming to State Specifications 8010- 81D-04, or rapid dry yellow conforming to State Specifications 8010-81D-05, in accordance with the color stipulated on the plans or as directed by the Engineer.
Paint shall be applied in two (2) equal thicknesses totaling the minimum required wet film thickness indicated in Subsection 310- 5.6.5, “Traffic Stripes and Markings”, of the Standard Specifications. A minimum period of 14 days shall be allowed between the two applications of striping, or as directed by the Engineer.
Delete Paragraph 1 of Subsection 210-1.6.5, “Reflective Material”, of the Standard Specifications, and add the following:
Reflective material shall consist of glass beads added to the surface of each coat of paint prior to setting, so that the beads will have proper adhesion. Special care shall be taken with rapid dry paint and thermoplastic material.
SECTION 7 - SPECIAL PROVISIONS (Continued)
- 116 -
May 2023
Delete Paragraph 1 of Subsection 310- 5.6.7, “Layout, Alignment and Spotting”, of the Standard Specifications, and add the following:
The CONTRACTOR shall perform all layout, alignment and spotting. The CONTRACTOR shall be responsible for the completeness and accuracy of all layout, alignment and spotting. Traffic striping shall not vary more than ½ inch in 50 feet from the alignment shown on the plans.
Pavement markings including crosswalk lines and arrows shall be thermoplastic per the Standard Specifications and these Special Provisions.
Posts for roadway signs shall be 2-inch squire perforated steel rectangular tubing in accordance with City Standard Plan B-305, except as shown on the plans or as directed by the Engineer.
The face of roadway signs shall be treated with High Intensity Prismatic Vinyl Sheeting (3M, Avery Denson, or approved equal). Anti-Graffiti Sheeting (3M 1160 or approved equal) shall also be applied. The exposed fastening hardware on the face of signs shall be painted, using touch- up enamel that matches the background.
Payment for traffic signing, striping, and pavement markers shall be included in the Lump Sum Bid for Traffic Control. Said payment shall include full compensation for furnishing all labor, materials (including paint and glass beads), raised markers, adhesive, tools, equipment and incidentals, and for doing all the work involved in painting traffic stripes (regardless of the number, widths, and patterns of individual stripes involved in each traffic stripe), pavement markings including any necessary cat tracks, dribble lines and layout work, and traffic signs, complete in place, as shown on the plans, as specified in these specifications and the special provisions, and as directed by the Engineer, Removal of all existing stripes and pavement markers not conforming to the striping and signing plan shall also be included in the contract price per lump sum and no additional compensation will be allowed.
ARTICLE 34 - RIDE QUALITY STANDARD
If, in the opinion of the City Engineer, the ride quality of the final asphalt concrete is not acceptable, the CONTRACTOR shall, within thirty (30) calendar days of placement of the final paving surface, have the surface profiled using a California Profilograph in accordance with California Test 526 and provide the CITY with an original profile graph.
The cost for this work shall be included in the various contract items of work and no additional compensation will be allowed.
The time allotted for the Profilograph and any surface repair (as indicated by the Profilograph) shall be included in the Contract Time for this project and in accordance with the respective Alternate and no additional time or compensation will be allowed.
If the finished surface of the asphalt concrete does not meet the specified surface tolerance, one- quarter inch per twelve feet (1/4” per 12’), it shall be brought within tolerance by either (1) abrasive grinding, or (2) removal and replacement. The Engineer will select the method. The corrective work shall be at the CONTRACTOR's expense.
SECTION 7 - SPECIAL PROVISIONS (Continued)
- 117 -
May 2023
If abrasive grinding is used, the method must be performed with grinding equipment utilizing diamond-cutting blades to bring the finished surface to specified surface tolerance. Additional grinding shall be performed as necessary to extend the area ground in each lateral direction so that the lateral limits of grinding are at a constant offset from, and parallel to the nearest lane line or pavement edge, and in each longitudinal direction so that the grinding begins and ends at lines normal to the pavement centerline, within any ground area. All ground areas shall be neat rectangular areas of uniform surface appearance. A fog seal coat shall be applied to the grounded areas in accordance with the provisions in Sections 203 and 302 of the Standard Specifications.
The corrective work shall be done prior to final painting of traffic lanes and after "cat" tracking.
The cost for this work shall be included in the various contract items of work and no additional compensation will be allowed therefore.
ARTICLE 35 – POLYVINYL CHLORIDE (PVC) DOMESTIC WATER PIPE
All PVC pipe for domestic water construction shall comply with AWWA C900, AWWA C-905 and Section 2-02 and all other applicable sections of the City of Garden Grove Water Services Division Standard Specifications (WSDSS). All ductile iron fittings shall conform to AWWA C110 (or AWWA C153) and Section 2-08 of WSDSS and shall be double-wrapped in a polyethylene protective wrapping per AWWA C105 and Section 2-01.04 of WSDSS.
Payment for PVC pipe shall be made at the contract price per linear foot for PVC C900 or C-905 CL 200 pipe. Said payment shall include all labor, materials, tools, equipment, including potholing all existing utilities along the proposed alignment, excavation and removals, subgrade preparation, removing interfering portions of abandoned utilities, and laying of pipes at grade, bedding, aggregate base, asphalt concrete, maintenance and protecting in place of all utilities and storm drain facilities, disposal of excavated materials and excess materials, backfill, compaction, bends, tees, fittings, restraint methods, and all other labor, equipment, and materials required for the construction of PVC C900, OR C-905 CL 200 pipe complete- in-place, and no additional compensation will be allowed.
ARTICLE 36 – GATE VALVE
Installation of all gate valves shall comply with AWWA C509 and Section 2-05 and all other applicable sections of the City of Garden Grove Water Services Division Standard Specifications (WSDSS), including valve boxes.
Payment for Gate Valves shall be made at the contract price per each for all Gate Valves. Said payment shall include all labor, materials, tools, equipment, required for the installation of Gate Valves complete-in-place, and no additional compensation will be allowed.
ARTICLE 37 – WATER SERVICE LINE
Reconnection of all water service laterals shall comply with Section 2-10 and all other applicable sections of the City of Garden Grove Water Services Division Standard Specifications (WSDSS).
SECTION 7 - SPECIAL PROVISIONS (Continued)
- 118 -
May 2023
Includes removing paving or other surface material, potholing, excavating trench across right-of- way or excavating bore pit and bore in service, removing existing meter box, installing service saddle, corp. stop or valve, tapping the main and installing service pipe and fittings (short or long laterals), tracer wire, angle meter stop, meter, meter antenna, meter box with pad, backfilling trench or boring pit by mechanical compaction or a hand tamper, and installing temporary and permanent asphalt concrete or concrete paving, restoring sidewalk and restoring any othe r physical features affected by the work as required by City Standard Plan B-721 (exclude note 4) and B-718, the plans and specifications, where the replacement meter box location is within three (3) feet of the existing meter box being replaced and the customer’s line shall be adjusted under Bid Item 16, including connecting to the meter. Where the replacement meter box location is three (3) feet to ten (10) feet of the existing meter box being replaced and the customer’s line shall be adjusted under Bid Item 15, including connecting to the meter. Disinfect and flush service and transfer existing meter to new service. Upon completion of change over, Contractor shall verify the water service is operable. Contractor shall make contact with customer at time of changeover through a written notice of planned disruption of service.
GSWC will give customer written notice of planned disruption of service.
Water service installed on an existing water main shall include any required disinfection and pressure testing.
The costs associated with the removal or abandonment of an existing service, where that service is located on a main to be abandoned, and a separate bid item has not been provided shall be included in this bid item. Where the service to be removed or abandoned is on a main not scheduled to be abandoned, or the service is not scheduled to be replaced, a separate bid item, The Contractor shall excavate the service at the meter box and cut the service pipe at a depth of approximately 18-inch in depth below grade, crimp the remaining service and cut off service pipe and curb stop as approved City prior to properly disposing. All excavated areas shall be restored including backfilling, compacting, temporary and permanent paving, sidewalk, and any other physical features affected by the work as required by the governing agency encroachment permit.
Refer to the Service Survey Report for the required work.
Payment will be based on an estimate of the percentage of work completed in place Payment for Water Service Laterals shall be made at the contract price per each for all Water Service Laterals (Bid Item 15 and or 16). Said payment shall include all labor, materials, tools, equipment, required for the reconnection of Water Service Laterals complete- in-place, and no additional compensation will be allowed.
ARTICLE 38– FIRE HYDRANT
Furnishing and installing a new fire hydrant shall comply with Section 2-07 and all other applicable sections of the City of Garden Grove Water Services Division Standard Specifications (WSDSS).
It includes removing pavement or other surface material, potholing, excavating trench, installing main line fitting (tee/tapping sleeve), tapping valve/ gate valve, ductile iron fittings, thrust blocks, and appurtenances from the point
Payment for Fire Hydrant Laterals shall be made at the contract price per each for all Fire Hydrant Laterals. Said payment shall include all labor, materials, tools, equipment, required for the reconnection of Fire Hydrant Laterals complete-in-place, and no additional compensation will be allowed.
SECTION 7 - SPECIAL PROVISIONS (Continued)
- 119 -
May 2023
ARTICLE 39 – MAINTAINING WATER SERVICE
The CONTRACTOR shall maintain the supply of water to customers at all times except for the time necessary to make connections to the existing water mains and the reconnection of the individual services to the new 8/12-inch water mains. The sequencing will need to be coordinated with the CITY a minimum of seven calendar days prior to beginning any connections and/or shut downs of existing water mains. The CONTRACTOR shall maintain continuous fire protection at all times during the construction of the project. It is the CONTRACTOR’s responsibility to provide advance notification to and coordinate the construction with the Garden Grove Fire Department.
The CONTRACTOR will maintain the supply of water to customers and the fire protection by installing a temporary bypass system during construction. The CONTRACTOR shall provide all necessary piping, fittings, hoses, and any other appurtenances necessary to construct the bypass to maintain a constant supply of water. The temporary bypass piping and appurtenances shall be suitable for potable water. All bypass facilities shall be disinfected after installation and prior to placing in operation. Pressure test is not required, but the piping and connections shall not leak.
All visible leaks shall be repaired immediately.
ARTICLE 40 – WATER SYSTEM FLUSHING, HYDROSTATIC PRESSURE TESTING, AND
DISINFECTION
Disinfection of all Water Pipe shall be by liquid Chlorination only. All water mains, water services, attached appurtenances and connections shall be tested, disinfected, and flushed per Section 3- 11 and all other applicable sections of the City of Garden Grove Water Services Standard Specifications (WSDSS).
In addition, water system flushing shall be restricted to the hours between 12:00 A.M. to 5:00 A.M. and shall not be more than 1,200 feet at any one time. The project area is within a Flood Hazard Area (OCFCD28), flushing shall be performed in a manner that avoids flooding. Proper equipment to prevent flooding shall be on site at all times. Flushing should never occur right before start of construction sufficient time must be allowed for all flow from flushing to properly drain.
Maps of drainage facilities in Orange County can be found in the OC Infrastructure Programs webpage (Drawings & Maps | OC Infrastructure Programs California (ocpublicworks.com) . Initial
flushing shall be done prior to hydrostatic pressure testing, follow by chlorination.
Full compensation for conforming to the requirements of this Article is included in the price bid per linear foot of Water Pipe, and no additional compensation will be allowed.
ARTICLE 41 – ABANDONMENT AND REMOVAL OF CONDUITS AND STRUCTURES
When water main is to be abandoned and/or removed within specified limits, all structures and appurtenances within said limits shall also be abandoned and/or removed. The abandonment and/or removal of conduits and structures shall be done per the Plans.
SECTION 7 - SPECIAL PROVISIONS (Continued)
- 120 -
May 2023
Payment for abandonment and/or removal of conduits and structures shall be considered as included in the contract price paid per linear foot for the Abandon In Place or Remove Existing Mains. Said payment shall include full compensation for furnishing all labor, materials, tools, equipment and incidentals, and for performing all work involved, and no additional compensation will be allowed.
ARTICLE 42 – CHANGEABLE MESSAGE BOARDS
Four (4) portable changeable message boards shall be installed by the Contractor at least two weeks in advance of the start of construction. Contractor shall coordinate with the City for verbiage to be programmed on message board as well as the location of message boards. Message boards shall be the portable type and trailer mounted. Message boards shall be energy efficient with full matrix display and self powered (battery and solar powered).
Payment for the installation of the four changeable message boards shall be included in the Lump Sum Bid for Traffic Control. Said payment shall include all labor, materials, tools, equipment, including message board, appurtenances, complete and in place, to the satisfaction of the Engineer, and no additional compensation will be allowed.
ARTICLE 43 – PERMITS AND IMPLEMENT RULE 1166
It is the CONTRACTOR’s responsibility to procure the encroachment permit and pay the requested permit fees within two weeks of the Notice to Proceed. The CONTRACTOR is responsible for all the permit requirements, including arranging for the inspections. The CONTRACTOR shall also be responsible for all the requirements of South Coast Air Quality Management Rule 1166. Full compensation for conforming to the requirements of this Article shall be considered as included in the contract price paid for implementing rule 1166 and obtaining Permits and no additional compensation will be allowed.
ARTICLE 44 - COMPLETION AND ACCEPTANCE
Upon receipt of the CONTRACTOR's written assertion that the work has been completed, the Engineer or his authorized representative will inspect the work for acceptance. Thereby a "punch list" is prepared and submitted to CONTRACTOR for compliance and/or repair.
The project is considered certifiable for completion; when all liens and/or claims for labor, materials, tools and equipment has been paid for and all liens and/or claims releases are received by the CITY, when all contract items of work have been completed, including changes to the plan in an acceptable workmanship; when all repairs to damages of existing utilities, appurtenances and improvements has been completed and accepted by the respective owners; when all survey monuments and other survey markers has been re-set and copy of center line ties been submitted; when the project site and all ground occupied by the CONTRACTOR left in a neat and presentable condition. The street shall be swept and washed with water. The CONTRACTOR prior to acceptance by the Engineer must complete all corrections noted in the “punch list”.
Full compensation for conforming to the requirements of this Article shall be considered as included in the contract prices paid for the various contract items of work and no additional compensation will be allowed.
SECTION 7 - SPECIAL PROVISIONS (Continued)
- 121 -
May 2023
SECTION 7 - SPECIAL PROVISIONS (Continued)
- 122 -
May 2023
THIS PAGE INTENTIONALLY BLANK
APPENDIX A: CITY OF GARDEN GROVE
WATER SERVICES DIVISION STANDARD
SPECIFICATIONS / STANDARD PLANS &
EXHIBIT “B-1”, “B-2”
APPENDIX b: ADDITIONAL INSURED
ENDORSEMENT
POLICY NUMBER: COMMERCIAL GENERAL LIABILITY
THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY.
ADDITIONAL INSURED – OWNERS, LESSEES OR
CONTRACTORS (FORM B)
This endorsement modifies insurance provided under the following:
COMMERCIAL GENERAL LIABILITY COVERAGE PART.
SCHEDULE
Name of person or Organization:
(If no entry appears above, information required to complete this endorsement will be shown in the Declarations as applicable to this endorsement.)
WHO IS AN INSURED (Section II) is amended to include as an insured the person or organization shown in the Schedule, but only with respect to liability arising out of “your work” for that insured by or for you.
APPENDIX C: WATER SERVICE AND METER
SURVEY REPORT
ATTACHMENT NO. 1
CITY OF GARDEN GROVE
PUBLIC WORKS DEPARTMENT
WATER SERVICES DIVISION
BID SUMMARY SHEET
PROJECT: Anabel ~ Woodbury Water Improvement
Project – CP1287000
BID OPENING
DATE: June 19, 2023
TIME: 10:00 AM
Engineer’s
Facility Name Estimate Contract Amount
Anabel Ave., Woodbury Rd., Libby Ln. $2,187,959 2,097,545
Bidder’s Name
Total Bid
%Under
/Over
Engineers
Estimate
1. 2 CEM CONSTRUCTION CORPORATION $2,097,545.00 -4.13%
2. Dominguez General Engineering, Inc. $2,118,250.00 -3.19%
3. All Cities Engineering, Inc. $2,123,605.00 -2.94%
4. Kana Pipeline, Inc. $2,364,479.00 8.07%
5. Bonadiman Water, Inc. $2,958,565.00 35.22%
6. T.E. Roberts, Inc. $2,974,722.00 35.96%
Agenda Item - 6.k.
City of Garden Grove
INTER-DEPARTMENT MEMORANDUM
To: Lisa L. Kim From: Craig Beck
Dept.: City Manager Dept.: Economic Development
Department
Subject: Report for Be Well OC
Mobile Response Team
Program and approval of FY
23-24 through 27-28
Agreement with Be Well OC
(Mind OC). ( Action Item)
Date: 7/25/2023
OBJECTIVE
Presentation of a Report for the Be Well Mobile Crisis Response Team Program and approval of FY 2023-24 through 2027-28 Professional Services Agreement with Be Well OC (Mind OC) as the service provider for the City’s Mobile Crisis Response Team program for select mental health calls for service.
BACKGROUND
In May 2021, the City Council approved an 18-month Be Well OC Pilot Program to deploy the Mobile Crisis Response Team. The agreement was subsequently amended in October 2022 and extended through June 30, 2023. The Be Well OC Mobile Crisis Response Team is trained to respond to and de-escalate situations such as mental health crisis, drug and alcohol use issues, proactive outreach to the homeless, non- domestic violence/family disputes, and welfare checks. The pilot program included a 6-month ramp-up, including a training period and community engagement, in coordination with the Garden Grove Police Department Special Resource Team (SRT), Orange County Fire Authority and the Community and Economic Development Department.
DISCUSSION
The Be Well OC Pilot Program was designed to divert calls for service from Garden Grove first responders to trained mental health professionals. Annually SRT responds to over 3,000 calls for service involving mental health related needs and Police dispatch receives over 11,000 calls related to homelessness in which mental illness is the primary cause or major factor. As the program evolves, we are working collaboratively to improve the mental health system of care to Garden Grove residents and remove barriers to accessing mental health professionals.
Over the past 18 months between October 1, 2021 and June 30, 2023, the Be Well
Team has responded to 6,312 calls for service and spends an average of 32 minutes on scene per call (See Attachment No. 1). The latest June 2023 data is highlighted below:
76% of the calls did not require a co-response, thereby making Garden Grove First Responders available to focus on critical emergency calls. 68% of the calls assisted unhoused individuals.
51% of the calls addressed a mental health crisis.
Implementation of the Be Well Pilot Program ended June 30, 2023. Moving forward proposed program enhancements include:
Increased focus on those impacted by homelessness;
Increased case management support;
Target services supporting Garden Grove’s diverse community; An addition of a second mobile response team van; and
Continued refinement of data dashboards and reporting analytics to ensure transparency and continuous quality improvement.
It is recommended the City Council approve a two-year (2) Professional Services Agreement with options to extend annually with a maximum performance period of up to five (5) years. Years one (1) and two (2) will continue with 18-hour daily operations at $1.1M annually. At the end of year two (2) an evaluation will be performed by City staff to determine the City needs at that time and consider a reduction in daily operations from 18-hours to 12-hours for years three to five (3 to 5), thereby potentially reducing annual costs. The proposed cost for year’s three to five (3 to 5) is described in the tables below:
18-Hour Operations (Attachment No. 3):
18 – Hour Operations Budget
Year 3 $1.1M + Consumer Price Index
(CPI)
Year 4 Approved Year 3 Budget + CPI
Year 5 Approved Year 4 Budget + CPI
12-Hour Operations (Attachment No. 4):
12 – Hour Operations Budget
Year 3 $775,000 + CPI
Year 4 Approved Year 3 Budget + CPI
Year 5 Approved Year 4 Budget + CPI
FINANCIAL IMPACT
There is no additional impact to the General Fund for the first two years of operations. Funding for Be Well OC was approved by the City Council in the adopted
•
• •
• •
• •
•
FY23-24 and FY 24-25 budget. Years three to five (3 to 5) will have proposed funding for 18-hour daily operations as follows: year three (3) at $1.1M plus CPI ($500,000 from GGPD and $600,000 plus CPI from general fund); year four (4) at approved year three (3) budget plus CPI ($500,000 from GGPD and difference from general fund); and year five (5) at approved year four (4) budget plus CPI ($500,000 from GGPD and difference from general fund). Of the total contract amount, $500,000 will continue to be included in the GGPD's operating budget for years 3 through 5. Future years' contract amount will be incorporated into the perspective year's operating budget, contingent upon funding availability.
RECOMMENDATION
It is recommended that City Council:
Approve a Professional Services Agreement with Be Well OC (Mind OC) for an amount not to exceed $1.1 million for years one and two (1 and 2); Approve year three (3) budget amount not to exceed $1.1M plus CPI; Approve year four (4) amount not to exceed the approved year three (3) amount plus CPI;
Approve year five (5) amount not to exceed the approved year four (4) amount plus CPI; and
Authorize the City Manager to sign the Agreement, and make minor modifications as appropriate on behalf of the City Council.
By: Monica Covarrubias
Sr. Project Manager
ATTACHMENTS:
Description Upload Date Type File Name
Attachment No.
1 - Be Well
Report - June
2023
7/18/2023 Cover
Memo Be_Well_Report_GG_-_June_2023_+_Inception.pdf
Attachment No.
2 - Professional
Services
Agreement
7/18/2023 Cover
Memo
AGREEMENT_-
_MIND_OC_(BE_WELL)_MOBILE_CRISIS_RESPONSE_PROGRAM.DOCX
Attachment No.
3 - 18-Hour
Budget
7/18/2023 Cover
Memo
Attachment_No._3_-_Budget_-_GG_Mobile_Response_(18-
Hour_Budget).pdf
Attachment No.
4 - 12-Hour
Budget
7/18/2023 Cover
Memo
Attachment_No._4_-_Budget_-_GG_Mobile_Response_(12-
Hour_Budget_Years_3-5).pdf
•
• •
•
•
June 2023
G Be Well Mobile Response Team - Garden Grove
Mobi le Services Report GARDEN GROVE
Total Services Completed Average Time on Scene Aggregate Time on Scene 400
300
100
363 35 Minutes 210 Hours
irA!1 Mobile Serv'ce Types irA11 Mobile Serv'ce Types irA11 Mobile Serv'ce Types Total Number of Services per Month (October 2021 - June 2023) 336
334 342 348
266 26
*114% increase in total services com leted from inception to June 2023 ~ N~ ~~n~b~,~~ fu~ J u ~~S~~~~~n~bMu~M~fune
2021 2021 2021 2022 2022 2022 2022 2022 2022 2022 2022 2022 2022 2022 2022 2023 2023 2023 2023 2023 2023 Types of Service
Dispatch
Proactive
Outreach 51
Mobile 51 Follow-Up
Reason for Service
Other •
51 (16.35%)'
Mental Health _;
158 (50.64%)
Welfare Check
1 103 (33.01%)
261
*Homelessness, Stlbstance Use, PD/i"re Assistance
Reason for Seivice wasnot recorded for 51 Mobile Fo low-Ups
June 2023
G Be Well Mobile Response Team - Garden Grove
Mobi le Services Report GARDEN GROVE
No Co-Response Required Average Response Time
76% 8 minutes
()
Aggregate Time on
Dispatch Calls
196 Hours
Transported Via
Be Well Mobile 40
Private Ambulance
*AJ Mobile Service Types iroispatch Ca Is Only *Includes Time on Scene and Response Time Other Responders on Scene
Other" 13 (3.32%) 1
No Co-Response _/
277 (70.84%)
Fire Department
,..._..,r_ 2s (6.39%)
Police Depa rtment
,,- 76 (19.44%)
•er·s' s Assessment Teams., Private Ambulances
Please note: the numbers listed above may be > number o f services due to multiple co-response on scene, Total
Transports
~
55 Police Department
Fire Department
Transport Locations
Col ege CSU, HCA CSU Other CSU 6 (10.91%) 1 Be Well Crisis Sta bilization Unit ' 8 (14.55%) Shelter 1 (1.82%) ---
Police 4 (7.27%) ---, ~ Private Residence
~ 4 (7.27%)
Othe r• 5 (9.09%) -
Homeless Services
-1 (1.82%)
Emergency Dept. _J
16 (29.09%)
_ Sobe ring Center
10 (18.18%)
*County Mental Health crnics, Group Homes, Unknown
June 2023
G Be Well Mobile Response Team - Garden Grove
Mobile Services Report GARDEN GROVE
Disposition / Outcomes of ALL Services
Resources/Referrals Provided
Supplies Provided
96 (16.44%)
Transported
55 (9.42%)
58 (9.93%) \
Refused Services 1
76 (13.01%)
Initiated Contact
/ 176 (30.14%)
\ Cancelled/UTL / GOA*
123 (21.06%)
*Unable to Locate/ Gone on Arrival
Please note: number of outcomes may be > number of services due to mult iple outcomes being selected Housing Status of ALL Services
Services for Housed People
r 115 (31.68%)
L Services for Unhoused People
248 (68.32%)
*68% of services this month involved contact with an unhoused person.
Please note: housing status is recorded during every service
June 2023 G Be Well Mobile Response Team - Garden Grove Mobile Services Report GARDEN GROVE
During the month of June:
94 unique people were provided services by the Mobile
Response Team in the city of Garden Grove.
The longest total encounter time on a Mobile Service was 2 Hours and 46 minutes.
The Demographics of the people that received
services this month are displayed on this page.
Ages of Unique People Served
Minor (0-17) 4
Adult (18-64)
Older Adult (65 +) 14
Unknown 12
64 Genders of Unique People Served
Male 55
Female 30
Transgender Male 1
Unknown 8
Housing Status of Unique People Served
Housed
Unhoused 57
Oct 2021 - June 2023
G Be Well Mobile Response Team - Garden Grove
Mobi le Services Report GARDEN GROVE
Total Services Completed Average Time on Scene Aggregate Time on Scene 400
300
100
6,312 32 Minutes 3,274 Hours
irA!1 Mobile Serv'ce Types irA11 Mobile Serv'ce Types irA11 Mobile Serv'ce Types Total Number of Services per Month (October 2021 - June 2023) 336
348 334 342
266 26
*114% increase in total services com leted from inception to June 2023 ~ N~ ~~n ~b~,~~ fu~ J u~~S~~~~~n~bMu~M~fune
2021 2021 2021 2022 2022 2022 2022 2022 2022 2022 2022 2022 2022 2022 2022 2023 2023 2023 2023 2023 2023 Types of Service
Dispatch
Proactive
Outreach
Mobile
Follow-Up
856
471
Reason for Service
Ot her• 726 (12.43%) 1
Mental Health .../
3,119 (53.4%)
Welfare Check
,- 1,996 (34.17%)
4,985
*Homelessness, Stlbstance Use, PD/i"re Assistance
Reason for Service was not recorded for 471 Mobile Fo low-Ups
Oct 2021 - June 2023
G Be Well Mobile Response Team - Garden Grove
Mobi le Services Report GARDEN GROVE
No Co-Response Required Average Response Time
()
Aggregate Time on
Dispatch Calls
Transported Via
Be Well Mobile 805
64% 9 minutes 3,323 Hours Police Departm ent
Private Ambulance
Fire Departm ent
Other*
*AJ Mobile Service Types iroispatch Ca Is Only *Includes Time on Scene and Response Time Other Responders on Scene
Other• 150 (2.25%) I
No Co-Response __,-
4,068 (61.11%)
Fire Department
I 259 (3.89%)
Police Department
2.180 (32.75%)
•er·s' s Assessment Teams., Private Ambulances
Please note: the numbers listed above may be > number of services due to multiple co-response on scene, Total ~
1,040 20
Transports 11 -TaxVRideshare, Unknown
Transport Locations
<ol ege CSU, HCA CSU Other CSU 91 (8.75%) 1
Shelter 46 (4.42%)
Be Well Crisis Stabilization Unit
,- 183 (17.6%)
Police 44 (4.23%) ~
Other• 124 (11.92%) - " ~
Private Residence
44 (4.23%)
Homeless Services _
13 (1.25%)
Emergency Dept. _/
322 (30.96%)
_ Sobering Center
165 (15.87%)
- Bus Station 8 (0.77%)
"County and Private Mental Health Clinics, Group Homes, Substance Use Disorder Fad ities
Oct 2021 - June 2023
G Be Well Mobile Response Team - Garden Grove
Mobile Services Report GARDEN GROVE
Disposition / Outcomes of ALL Services
Resources/Referrals Provided
1,044 (11.05%) \
Transported
1,040 (11.01%)
Supplies Provided ____,/"
1,339 (14.17%)
Refused Services _j
1,304 (13.8%)
Initiated Contact
2,872 (30.4%)
\_ Cancelled/UTL/GOA *
1,848 (19.56%)
*Unable to Locate/ Gone on Arrival
Please note: number of outcomes may be > number of services due to multiple outcomes being selected Housing Status of ALL Services
• Services for Housed People Services for Un housed People 306
300 284
267 276 269 264
250
244 257 248
226
216 218
205
200
171 172
150
100
129
99 95
145
78 95 95
131 119 126
108 109
127 130
117 109 111
144
119 115
50 iiiiii
Please note: housing status is recorded during every service
Oct 2021 - June 2023
G Be Well Mobile Response Team - Garden Grove
Mobile Services Report GARDEN GROVE
From Inception of Program to June 2023:
1,958 unique people have been provided services by the
Mobile Response Team in the city of Garden Grove.
The longest total encounter time on a Mobile Service was 4 Hours and 46 minutes.
The Demographics of the people that have received
services are displayed on this page.
Ages of Unique People Served
Minor (0-17) 112
Adult (18-64) 1,239
Older Adult (65 +) 137
Unknown 470
Genders of Unique People Served
Male 1,126
Female 682
Other* 18
Unknown 132
*Trans Female, Trans Male, Non-B inary
Housing Status of Unique People Served
Housed
Unhoused 1,053
1 1581609.1
PROFESSIONAL SERVICES AGREEMENT
THIS AGREEMENT is made this 1st day of July 2023 by the CITY OF GARDEN GROVE, a municipal corporation, ("CITY") and MIND OC , a California nonprofit corporation, hereinafter referred to as “CONTRACTOR”.
RECITALS
The following recitals are a substantive part of this Agreement:
1. This Agreement is entered into pursuant to Garden Grove City Council approval on July 25, 2023.
2. CITY desires to utilize the services of CONTRACTOR to design, develop, and deploy a Mobile Crisis Response Program per Attachment “A”.
3. CONTRACTOR is qualified by virtue of experience, training, education and expertise to accomplish services.
AGREEMENT
THE PARTIES MUTUALLY AGREE AS FOLLOWS:
1. Term and Termination. The term of the agreement shall be from July 1, 2023 through June 30, 2025, with an option to extend said agreement an additional three years. Option years shall be exercised one year at time, at the sole option of the CITY. This agreement may be terminated by the CITY without cause. In such event, the CITY will compensate CONTRACTOR for work performed to date in accordance with CONTRACTOR’s proposal which is attached as Attachment “A” and is hereby incorporated by reference. CONTRACTOR is required to present evidence to support performed work completion.
2. Services to be Provided. The services to be performed by CONTRACTOR shall consist of tasks as set forth in the Proposal attached as Attachment “A”. The Proposal is incorporated herein by reference. The Proposal and this Agreement do not guarantee any specific amount of work.
3. Compensation. CONTRACTOR shall be compensated as follows:
3.1 A MOUNT. Total Compensation under this agreement shall not exceed (NTE) amount of One Million One Hundred Thousand Dollars ($1.1 million), per year for the first two years, payable in arrears and in accordance with proposal in Attachment A. Total Compensation for option years three, four, and five shall have a not to exceed (NTE) amount with options for 18-hour operations or 12- hour operations. For 18-hour operations option year three NTE amount of One Million One Hundred Thousand Dollars ($1.1 million), plus Consumer Price Index (CPI); year four NTE amount of Approved Year Three Budget, plus CPI; year five NTE amount of Approved Year Four Budget, plus CPI. For
2 1581609.1
12-hour operations option year three NTE amount of Seven Hundred Seventy Five Thousand Dollars ($775,000), CPI; year four NTE amount Approved Year Three Budget, plus CPI; year five NTE amount of Approved Year Four Budget, plus CPI payable in arrears and in accordance with proposal in Attachment B.
3.2 PAYMENT. For work under this Agreement, payment shall be made per invoice for work completed. Within 45 day of delivery of goods or completion of performance of services, CONTRACTOR must promptly render an invoice to CITY or payment may be significantly delayed. For extra work not a part of this Agreement, a written authorization by CITY will be required, and payment shall be based on schedule included in Proposal (Attachment A).
3.3 Records of Expenses. CONTRACTOR shall keep complete and accurate records of all costs and expenses incidental to services covered by this Agreement for a minimum of five years. These records will be made available at reasonable times to CITY.
3.4 Termination. CITY shall have the right to terminate this agreement, without cause, by giving thirty (30) days written notice of termination. If the Agreement is terminated by CITY, then the provisions of Paragraph 3 would apply to that portion of the work completed.
4. Insurance requirements.
4.1 C OMMENCEMENT OF WORK. CONTRACTOR shall not commence work under this Agreement until all certificates and endorsements have been received and approved by the CITY. All insurance required by this Agreement shall contain a Statement of Obligation on the part of the carrier to notify the CITY of any material change, cancellation, or termination at least thirty (30) days in advance.
4.2 W ORKERS COMPENSATION INSURANCE. During the duration of this Agreement, CONTRACTOR and all subcontractors shall maintain Workers Compensation Insurance in the amount and type required by law, if applicable.
4.3 I NSURANCE AMOUNTS. CONTRACTOR shall maintain the following insurance for the duration of this Agreement:
(a) Commercial general liability in an amount of $1,000,000.00 per occurrence (claims made and modified occurrence policies are not acceptable); Insurance companies must be acceptable to CITY and have a Best’s Guide Rating of A- Class VII or better, as approved by the CITY.
(b) Automobile liability in an amount of $1,000,000.00 combined single limit (claims made and modified occurrence policies are not acceptable); Insurance companies must be acceptable to CITY and have a Best’s Guide Rating of A- Class VII or better, as approved by the CITY.
(c) Professional liability in an amount not less than $1,000,000. Insurance companies must be admitted and licensed In California and have a Best’s Guide Rating of A-,Class VII or better, as approved by the City. If the policy is written
3 1581609.1
on a “claims made” basis, the policy shall be continued in full force and effect at all times during the term of the agreement, and for a period of three (3) years from the date of the completion of services provided. In the event of termination, cancellation, or material change in the policy, professional/contractor shall obtain continuing insurance coverage for the prior acts or omissions of professional/ contractor during the course of performing services under the term of the agreement. The coverage shall be evidenced either by a new policy evidencing no gap in coverage, or by obtaining separate extended “tail” coverage with the present or new carrier.
An On-Going and Completed Operations Additional Insured Endorsement for the policy under section 4.3 (a) shall designate CITY, its officers, officials, employees, agents, and volunteers as additional insureds for liability arising out of work or operations performed by or on behalf of the CONTRACTO R.
CONTRACTOR shall provide to CITY proof of insurance and endorsement forms that conform to CITY’s requirements, as approved by the CITY.
An Additional Insured Endorsement for the policy under section 4.3 (b) shall designate CITY, its officers, officials, employees, agents, and volunteers as additional insureds for automobiles, owned, leased, hired, or borrowed by the CONTRACTOR. CONTRACTOR shall provide to CITY proof of insurance and endorsement forms that conform to CITY’s requirements, as approved by the CITY.
For any claims related to this Agreement, CONTRACTOR’s insurance coverage shall be primary insurance as respects CITY, its officers, officials, employees, agents, and volunteers. Any insurance or self- insurance maintained by the CITY, its officers, officials, employees, agents, and volunteers shall be excess of the CONTRACTOR’s insurance and shall not contribute with it.
If CONTRACTOR maintains higher insurance limits than the minimums shown above, CONTRACTOR shall provide coverage for the higher insurance limits otherwise maintained by the CONTRACTOR.
5. Non-Liability of Officials and Employees of the City . No official or employee of CITY shall be personally liable to CONTRACTOR in the event of any default or breach by CITY, or for any amount, which may become due to CONTRACTOR.
6. Non-Discrimination. CONTRACTOR covenants there shall be no discrimination against any person or group due to race, color, creed, religion, sex, marital status, age, handicap, national origin, or ancestry, in a ny activity pursuant to this Agreement.
7. Independent Contractor. It is agreed to that CONTRACTOR shall act and be an independent contractor and not an agent or employee of the CITY, and shall obtain no rights to any benefits which accrue to CITY'S employees.
4 1581609.1
8. Compliance with Law.
8.1 CONTRACTOR shall comply with all applicable laws, ordinances, codes, and regulations of the federal, state, and local government.
CONTRACTOR shall comply with, and shall be responsible for causing all contractors and subcontractors performing any of the work pursuant to this Agreement to comply with, all applicable federal and state labor standards, including, to the extent applicable, the prevailing wage requirements promulgated by the Director of Industrial Relations of the State of California Department of Labor. The City makes no warranty or representation concerning whether any of the work performed pursuant to this Agreement constitutes public works subject to the prevailing wage requirements.
8.2 Compliance with Federal Requirements. This Agreement requires compliance with certain provisions of Title 2 C.F.R. 200 – Uniform Administrative Requirements, Cost Principl es, and Audit Requirements for Federal Awards. CONTRACTOR agrees to comply with all applicable federal laws, regulations, and policies governing the funds provided under this Agreement. During the performance of this Agreement, CONTRACTOR shall comply with all applicable federal laws and regulations, including, including, but not limited to, the following: Fund payments are considered to be federal financial assistance subject to the Single Audit Act (31 U.S.C. 7501-7507); CONTRACTOR is subject to a single audit or program specific audit pursuant to 2 C.F.R. 200.501(a) when CONTRACTOR spends $750,000 or more in federal awards during their fiscal year ; Fund payments are subject to 2 C.F.R. 200.303 regarding internal controls ; Fund payments are subject to 2 C.F.R. 200.330 through 200.332 regarding CONTRACTOR monitoring and management; Fund payments are subject to Subpart F regarding audit requirements. Subcontracts, if any, shall contain a provision making them subject to all of the provisions stipulated in this Agreement, including but not limited to 2 C.F.R. 200.3 03, 2 C.F.R. 200.330-332, 2 C.F.R. 200.501(a), and 2 C.F.R. Part 200 Subpart F. With respect to any conflict between such federal requirements and the terms of this Agreement and/or the provisions of state law and except as otherwise required under federal law or regulation, the more stringent requirement shall control.
8.3 Program Fraud & False or Fraudulent Statements or Related Acts .
CONTRACTOR and any subcontractors must comply with 31 U.S.C.
Chapter 38, Administrative Remedies for False Claims and Statements, which shall apply to the activities and actions of Subrecipient and any subcontractors pertaining to any matter resulting from a contract.
8.4 Debarment / Suspension and Voluntary Exclusion. Non-Federal entities and contractors are subject to the deba rment and suspension regulations implementing Executive Order 12549, Debarment and
5 1581609.1
Suspension (1986) and Executive Order 12689, Debarment and Suspension (1989) at 2 C.F.R. Part 180 and the Department of Homeland Security’s regulations at 2 C.F.R. Part 3000 (Nonprocurement Debarment and Suspension). These regulations restrict awards, subawards, and contracts with certain parties that are debarred, suspended, or otherwise excluded from or ineligible for participation in Federal assistance programs and activities. A contract award must not be made to parties listed in the Systems of Award Management (“SAM”) Exclusions. SAM Exclusions is the list maintained by the General Services Administration that contains the names of parties debarred, suspended, or otherwi se excluded by agencies, as well as parties declared ineligible under statutory or regulatory authority other than Executive Order 12549. SAM exclusions can be accessed at www.sam.gov.
8.5 Access to Records. As required by 2 C.F.R. 200.331(a)(5), CITY, or any duly authorized representative of CITY, shall have the right of access to any records, documents, financial statements, papers, or other records of CONTRACTOR that are pertinent to this Agreement, in order to comply with any audits pertaining to funds allocated to CONTRACTOR under this Agreement. The right of access also includes timely and reasonable access to CONTRACTOR’s personnel for the purpose of interview and discussion related to such documents. The right of access is not limited to the required retention period, but lasts as long as the records are retained.
8.6 Internal Controls. CONTRACTOR must comply with 2 C.F.R. 200.303 and establish and maintain effective internal control over the funds allocated under this Agreement and provide reasonable assurance that the Subrecipient is managing the award in compliance with Federal statutes, regulations, and the terms and conditions of the award.
8.7 Personally Identifiable Information. CONTRACTOR must comply with 2 C.F.R. 200.303(e) and take reasonable measures to safeguard protected personally identifiable information, as defined in 2 C.F.R. 200.82, and other information designated as sensitive or the Subrecipient considers sensitive consistent with applicable Federal, state and local laws regarding privacy and obligations of confidentiality.
8.8 Hatch Act. CONTRACTOR must comply with provisions of the Hatch Act of 1939 (Chapter 15 of Title V of the U.S.C.) limiting the political activities of public employees, as it relates to the programs funded.
8.9 Conflicts of Interest. CONTRACTOR shall maintain written standards of conduct covering conflicts of interest and governing the actions of its employees engaged in the selection, award and administration of contracts. No employee, officer, or agent may participate in the selection, award, or administration of a contract supported by a Federal
6 1581609.1
award if he or she has a real or apparent conflict of interest. Such a conflict of interest would arise when the employee, officer, or agent, any member of his or her immediate family, his or her partner, or an organization which employs or is about to employ any of the parties indicated herein, has a financial or other interest in or a tangible personal benefit from a firm considered for a contract.
9. NNotices. All notices shall be personally delivered or mailed to the below listed address, or to such other addresses as may be designated by written notice.
These addresses shall be used for delivery of service of process.
a. (CONTRACTOR) Mind OC
Attention: Marshall Moncrief, MFT, MBA
18650 MacArthur Blvd., Suite 220
Irvine, CA 92612
b. (Address of City) (with a copy to):
City of Garden Grove Garden Grove City Attorney
11222 Acacia Parkway 11222 Acacia Parkway
Garden Grove, CA 92840 Garden Grove, CA 92840
Attention: City Manager
10. CContractor’s Proposal. This Agreement shall include CONTRACTOR's proposal, which shall be incorporated herein by reference. In the event of any inconsistency between the terms of the proposal and this Agreement, this Agreement shall govern.
11. Licenses, Permits, and Fees. At its sole expense, CONTRACTOR shall obtain a Garden Grove Business License, all permits, and licenses as may be required by this Agreement.
12. Familiarity with Work. By executing this Agreement, CONTRACTOR warrants that: (1) it has investigated the work to be performed; (2) it has investigated the site of the work and is aware of all conditions there; and (3) it understands the facilities, difficulties, and restrictions of the work under this Agreement.
Should Contractor discover any latent or unknown conditions materially differing from those inherent in the work or as represented by CITY, it shall immediately inform CITY of this and shall not proceed, except at CONTRACTOR' s risk, until written instructions are received from CITY.
13. Time of the Essence. Time is of the essence in the performance of this Agreement.
14. Limitation Upon Subcontracting and Assignment . The experience, knowledge, capability, and reputation of CONTRACTOR, its principals and employees were a substantial inducement for CITY to enter into this Agreement.
CONTRACTOR shall not contract with any other entity to perform the services required without written approval of the CITY. This Agreement may not be assigned voluntarily or by operation of law, without the prior written approval of CITY. If CONTRACTOR is permitted to subcontract any part of this Agreement,
7 1581609.1
CONTRACTOR shall be responsible to CITY f or the acts and omissions of its subcontractor as it is for persons directly employed. Nothing contained in this Agreement shall create any contractual relationship between any subcontractor and CITY. All persons engaged in the work will be considered empl oyees of CONTRACTOR. CITY will deal directly with and will make all payments to CONTRACTOR.
15. Authority to Execute. The persons executing this Agreement on behalf of the parties warrant that they are duly authorized to execute this Agreement and that by executing this Agreement, the parties are formally bound.
16. Indemnification. CONTRACTOR agrees to protect, defend, and hold harmless CITY and its elective or appointive boards, officers, agents, and employees from any and all claims, liabilities, expenses, or damages of any nature, including attorneys' fees, for injury or death of any person, or damage to property, or interference with use of property, arising out of, or in any way connected with performance of the Agreement by CONTRACTOR, CONTRACTOR's agents, officers, employees, subcontractors, or independent contractors hired by CONTRACTOR.
The only exception to CONTRACTOR's responsibility to protect, defend, and hold harmless CITY, is due to the sole negligence of CITY, or any of its elective or appointive boards, officers, agents, or employees.
This hold harmless agreement shall apply to all liability regardless of whether any insurance policies are applicable. The policy limits do not act as a limitation upon the amount of indemnification to be provided by CONTRACTOR.
17. Appropriations. This Agreement is subject to and contingent upon funds being appropriated therefor by the Garden Grove City Council for each fiscal year covered by the term of this Agreement. If such appropriations are not m ade, this Agreement shall automatically terminate without penalty to the CITY.
\ \ \ \
(Agreement Signature Block on Next Page)
8 1581609.1
IN WITNESS THEREOF, these parties have executed this Agreement on the day and year shown below.
Date: _____________
CITY OF GARDEN GROVE
By:_______________________________
Lisa L. Kim
City Manager
ATTEST:
By:______________________________
Teresa Pomeroy
City Clerk
Date: ______________
MIND OC
By:_______________________________
____________________________
By:_______________________________
____________________________
APPROVED AS TO FORM:
By:______________________________
City Attorney
If CONTRACTOR is a corporation, a Corporate
Resolution and/or Corporate Seal is required. If
a Partnership, Statement of Partnership must
be submitted to CITY.
9 1581609.1
ATTACHMENT “A”
CONTRACTOR’S PROPOSAL
Two 10-Hour Teams with a 30 min. unpaid lunch and some cross-over Summary Costs Team starts 30 min. early & end 30 min. after coverage Personnel 907,060 Team Shift Times Hour Types # of hrs/day Pay Rate Non-Personnel Operational Costs 212,940 1 Reg Hrs 8 1.0 Indirect Costs 100,000 1 Overtime Hrs 1.5 1.5 Philanthropy with Offset (items in purple) (120,000) 2 Reg Hrs 8 1.0 Annual Costs (12 months) 1,100,000 2 Overtime Hrs 1.5 1.5 # of Hours 19
Detailed Costs
Personnel Costs FTE # of Hrs/
Week
# Weeks/
Year
Hourly Rate
(Avg) Annual Wages Benefits @
25% Annual Total
Crisis Intervention Workers (CIS): 2 person team
CIS - Team 1 regular pay 2.80 56 52 30.75$ 250,723 62,681 313,404 CIS - Team 1 overtime pay 0.53 11 52 46.13$ 13,222 3,305 16,527 CIS - Team 2 regular pay 2.80 56 52 30.75$ 250,723 62,681 313,404 CIS - Team 2 overtime pay 0.53 11 52 46.13$ 13,222 3,305 16,527 CIS - Training/PTO/Floaters 0.50 40 52 -$ - - - CIS Subtotal 7.15 527,890 131,972 659,862 Case Manager 1.00 27.00$ 56,160 14,040 70,200 Manager, GG Team 1.00 48.00$ 99,840 24,960 124,800 Director, Clinical Operations 0.125 Shared Cost 86.54$ 22,500 5,625 28,125 Director, Education, Data & Outreach 0.125 Shared Cost -$ - - - Exec Assistant 0.125 Shared Cost 42.07$ 10,938 2,735 13,673 Data Analyst 0.125 Shared Cost -$ - - - Fleet Supervisor 0.125 Shared Cost 32.00$ 8,320 2,080 10,400 Operations Coordinator 0.125 Shared Cost -$ - - - Personnel Costs Total 9.90 725,648 181,412 907,060 Non-Personnel Operational Costs Qty Monthly Annual Total Office Space: TBD - -
Supplies (uniforms, van, program, office) # Teams 2 500 12,000 Community Outreach (Mktg) & Travel Expenses (Mileage for staff) 1 400 4,800 Technology Expenses # Teams 2 600 14,400 Medical Director (Consultant) Shared Cost 1 938 11,250 Professional Development (Program Specific) # Teams 2 304 7,290 Vans (Each/Month): Insurance ($500), Fuel ($1.0K per 9.5 hrs), Upkeep & Reg'n ($400) # Vans 2 1,800 43,200 Van 1 (CIS - Full Size) includes Retrofit Previously $110K funded by Philanthropy $s in 2021 - Van 2 (CIS - Full Size) includes Retrofit No indirect on van 120,000 Non-Personnel Operational Costs Total 212,940
Ongoing Personnel & Operational Costs 1,120,000
Indirect Costs No indirect on van Annual Total
Indirect (10%) 100,000
Ongoing Annual Total 1,220,000
Garden Grove: Mobile Crisis Intervention Services Team Budget for 07/23 - 06/24 18-Hour Coverage: Team Model from 6:00 am - 12:00 pm staggered w/ 2 Vans 05:30 am -
03:30 pm
2:30 pm -
12:30 am
Coverage: 6 am - 12 am
Garden Grove: Mobile Crisis Intervention Services Team Budget for 07/23 - 06/24 18-Hour Coverage: Team Model from 6:00 am - 12:00 pm staggered w/ 2 Vans Year 2: Philanthropic Offset Donation (Expenses in Purple) Annual Total Van 1 (CIS - Full Size) includes Retrofit Previously $110K funded by Philanthropy $s - Van 2 (CIS - Full Size) includes Retrofit (120,000)
Philanthropic Cost Offset Total (120,000)
Overall Total after Donation 1,100,000
I I I I I I I
I I I I I I I
Summary Costs Year 3 Shifts
Personnel 649,853 Team Shift Times Hour Types # of hrs/day Pay Rate Non-Personnel Operational Costs 54,693 1 Reg Hrs 8 1.0 Indirect Costs 70,455 1 Overtime Hrs 4 1.5 Philanthropy with Offset - 2 Reg Hrs 0 1.0 Annual Costs (12 months) 775,000$ 2 Overtime Hrs 0 1.5 Year 3 = Approved Budget + CPI (SAMPLE 4%) 806,000$ # of Hours 12 Year 4 = Approved Year 3 Budget + CPI TBD
Year 5 = Approved Year 4 Budget + CPI TBD One 12-Hour Team with a 30 min. unpaid lunch Team starts 15 min. early & end 15 min. after coverage
Detailed Costs Year 3
Personnel Costs FTE # of Hrs/
Week
# Weeks/
Year
Hourly Rate
(Avg) Annual Wages Benefits @
25%
Annual Total
07/25-06/26
Crisis Intervention Workers (CIS): 2 person team
CIS - Team 1 regular pay 2.80 56 52 30.75$ 250,723 62,681 313,404 CIS - Team 1 overtime pay 1.40 28 52 46.13$ 94,021 23,505 117,527 CIS Subtotal 4.20 344,744 86,186 430,931 Case Manager 0.80 27.00$ 44,928 11,232 56,160 Manager, GG Team 1.00 48.00$ 99,840 24,960 124,800 Director, Clinical Operations 0.091 Shared Cost 86.54$ 16,364 4,091 20,455 Exec Assistant 0.091 Shared Cost 42.07$ 7,955 1,989 9,944 Fleet Supervisor 0.091 Shared Cost 32.00$ 6,051 1,513 7,564 Personnel Costs Total 6.27 519,882 129,971 649,853 Non-Personnel Operational Costs Qty Monthly Annual Total Office Space: TBD - -
Supplies (uniforms, van, program, office) # Teams 1 400 4,848 Community Outreach (Mktg) & Travel Expenses (Mileage for staff) 1 400 4,800 Technology Expenses # Teams 1 600 7,200 Medical Director (Consultant) 0.100 Shared Cost 1 750 9,000 Professional Development (Program Specific) # Teams 1 304 3,645 Vans (Each/Month): Insurance ($500), Fuel ($1.2K per 12 hrs), Upkeep & Reg'n ($400) # Vans 1 2,100 25,200 Van 1 (CIS - Full Size) includes Retrofit Previously $110K funded by Philanthropy $s in 2021 - Non-Personnel Operational Costs Total 54,693
Ongoing Personnel & Operational Costs 704,546
Indirect Costs
Indirect (10%) 70,455
Overall Annual Total 775,000$
Garden Grove: Mobile Crisis Response Budget for Years 3 through 5 12-Hour Coverage: Team Model
Ex: 9:45 am -
10:15 pm
N/A
Coverage: 12 hours; Ex: 10 am - 10 pm
Be Well OC Proposal 07-10-2023 Page 1 of 1
I I I I I I I I I
! I I I I I I I I
I I
Agenda Item - 7.a.
City of Garden Grove
INTER-DEPARTMENT MEMORANDUM
To: Lisa L. Kim From: Craig Beck
Dept.: City Manager Dept.: Economic Development
Subject: Update on the Civic Center
Revitalization Project as
requested by City Manager
Kim.
Date: 7/25/2023
OBJECTIVE
To provide an update to the City Council on the Civic Center Revitalization Project regarding the issuance of a Request for Qualifications (RFQ) to initiate the procurement process.
BACKGROUND
Through issuance of a Request for Qualifications (RFQ), the City is seeking Statements of Qualification from development teams that have specific and demonstrable experience in delivering Design-Build-Finance (DBF) projects similar to the City’s Civic Center Revitalization Project (the “Project”) on the existing City Civic Center campus.
DISCUSSION
Through the evaluation process using a "best value" approach, the City intends to select a single development team to enter an exclusive negotiation with the City for a period of six (6) months. This exclusive negotiation is intended to culminate in a single development contract (Development Agreement) under which the development team will design, build, and finance the Project at an agreed not to exceed cost.
By utilizing a DBF under a progressive design-build-agreement project delivery approach, the City expects to secure substantial public benefits. These benefits include risk management, cost savings, expedited project design and construction scheduling, and capitalizing on developer knowledge about lifecycle cost management to deliver predictable long-term operation and maintenance costs.
Following the RFQ evaluation process, it is anticipated that a recommendation to enter into an Exclusive Negotiation Agreement (ENA) with a preferred development team will be brought forward by City Staff and submitted to the City Council for its consideration in September 2023.
City Staff, with the PFAL and Placeworks teams, are continuing to work together to advance the Civic Center Revitalization Project. At recent and upcoming City events (e.g., Concerts in the Park, Movies in the Park, Garden Grove Police Department National Night Out), the City is having informational booths available to engage with the community, garner feedback, and create awareness of the project. The project website (ggcity.org/civic-center) and the City’s various social media platforms are continuing to be maintained with regular updates, educational information, flyers, and news on the project to allow the community to stay connected and informed.
FINANCIAL IMPACT
There is no financial impact as this report is for informational purposes and no action is required.
RECOMMENDATION
This report is for informational purposes and no action is required by the City Council.