City of Hermosa Beach | Page 4 of 6
Analysis:

Employee Parking Permit Program
Monthly and annual parking passes are currently available for those who work in Hermosa Beach and do not have parking available on their employer’s property. Business licenses must be current, and all parking citations must be paid before receiving a parking permit.

City Council established the current rates at its February 28, 2023 meeting. Monthly permits are available in Lot C for $38 per month (Daily 5am–7pm only) and $75 per month for anytime up to 72 hours. Employees may also purchase permits to park at on-street spaces with yellow pole/cap meters and in the unmetered one-hour time restricted areas at an annual cost of $175 when employers are within the Impacted Parking Area. The number of annual employee and monthly Lot C permits issued by permit year are below.

Annual Employee Permit Sales
by Permit Year
Year Total
2024-25 207
2023-24* 138
2022-23 231
2021-22 169
2020-21 183
*Annual employee permit sales were lower due to permit sales being delayed until August 28, 2023.

Monthly Lot C
Employee Permit Sales
Current Permit Year
Type Total
Daily Lot C (5a-7p) 1,776
24-Hour Lot C 1,160
*Sales began on February 26, 2024
City Council increased the Employee Parking Permit prices in February 2023. However, because the price matched the general public price, program utilization was minimal. City Council raised the general public permit rates at its January 23, 2024 meeting and the Employee Parking Permit Program saw a significant increase in participation.

Employee Parking Permits must meet the following eligibility criteria:
 Business must be located within the City's Impacted Parking Area.  The following documents are required:
o Current business license (if you are the business owner) or a current pay stub less than 30 days old (if you are an employee);

Page 550 of 1852 ends

City of Hermosa Beach | Page 5 of 6
o Current CA vehicle registration (only for the Annual Permit) - must be in the name of the employee; and
o Valid Picture I.D. - acceptable forms include a driver’s license, California I.D., passport or military I.D.

Downtown Parking Lots
Parking Lots A, B, and C were 24-hour parking structures prior to the issuance of a temporary local health order enacted during COVID-19, which continues to restrict parking in these lots to a maximum of 3 hours. Any vehicle parked in these lots for over 3 hours is subject to citation.

Reverting back to pre-COVID parking hour restrictions in these Lots (24-hours up to 72- hours) would aide surrounding business and encourage visitors to spend more time in the City, which should result in both additional parking revenue and increased economic activity.

Parking activity for each of the three respective Lots are listed below. Activity is highly dependent on economic and weather factors and can vary from year to year. Most notably, peak activity has slightly dropped in the City’s largest lot (Lot C) year over year, signifying capacity for additional parking if the three-hour maximum restriction is lifted.

Peak Monthly Activity (July)
Year Lot A Lot B Lot C
2021 21,749 4,094 27,375
2022 20,595 2,607 27,022
2023 17,066 2,680 24,780
2024 20,215 4,449 21,795
Environmental Review
Pursuant to the California Environmental Quality Act (“CEQA”), the City finds that there is no evidence that the Project would have a significant effect on the environment. Thus, pursuant to CEQA Guidelines section 15061 (b)(3), it can be seen with certainty that there is no possibility that the activity in question may have a significant effect on the environment. Furthermore, section 15273 of the CEQA Guidelines states that CEQA does not apply to modification of fees by public agencies for meeting operating expenses or financial needs.

General Plan Consistency:

PLAN Hermosa, the City’s General Plan, was adopted by the City Council in August 2017.

The [enter project description here] supports several PLAN Hermosa goals and policies that are listed below.

Mobility Element

Page 551 of 1852 ends

City of Hermosa Beach | Page 6 of 6
Goal 1. A parking system that meets the parking needs and demand of residents, visitors, and employees in an efficient and cost-effective manner.

Policies:
 4.4 Preferential parking program. Periodically study and evaluate the current inventory of public parking supply and update the preferential parking program.  4.7 Parking availability. Optimize parking availability through dynamically adjusted pricing and new technology to manage available spaces for short-term parking use to encourage rates of turnover that are responsive to fluctuating demands.

Fiscal Impact:

There is no fiscal impact related to the recommended action.

Attachment:

Public Parking Map
Respectfully Submitted by: Brandon Walker, Administrative Services Director Concur: Angela Crespi, Deputy City Manager
Noted for Fiscal Impact: Brandon Walker, Administrative Services Director Legal Review: Patrick Donegan, City Attorney
Reviewed by: Angela Crespi, Deputy City Manager
Approved: Suja Lowenthal, City Manager

Page 552 of 1852 ends

PACI
FIC
C
O
A
S
T
H
WY

PROSPECT AVE

MONTEREY BLVD

PIER AVE
1ST ST
8TH ST
22ND ST
2ND ST

GOULD AVE

ARDMORE AVE

LONGFELLOW AVE
H
E
R
M
O
S
A
AV
E

HERMOSA AVE

AVIATION BLVD
M
A
N
H
AT
TA
N
AV
E

MANHATTAN AVE
27TH ST

LONGFELLOW AVE

VALLEY DR

ARTESIA BLVD
2ND ST
22ND ST
28TH ST
21ST ST

OCEAN VIEW AVE
29TH ST
14TH ST
21ST ST
15TH ST
5TH ST
1ST ST
HARPER
AVE
9TH ST
8TH ST
17TH ST
20TH ST

MORNINGSIDE DR
18TH ST
3RD ST
2ND ST
7TH ST

INGLESIDE DR
30TH PL
7TH PL
H
I
G
H
LAN
D
AVE

BONNIE BRAE ST
15TH PL
ALLEY
19TH ST
10TH ST
30TH ST

PALM DR
25TH ST

BEACH DR
15TH ST
14TH ST
34TH ST
B
EAC
H
D
R

TENNYSON PL
16TH ST
26TH ST
4TH ST

PARK AVE
27TH ST
C
R
EST
D
R
24TH ST
5TH ST
C
U
L
P
E
R
C
T

REYNOLDS LN

LYNDON ST
31ST PL

OZONE CT
34TH PL
1ST ST

HOLLO W E
L
L
AV
E
R
H
O
D
E
S
ST
18TH ST
ALLEY

OCEAN DR
31ST ST
M
EYE
R
CT
30TH ST

OWOSSO AVE
4TH CT
20TH ST
32ND PL

CYPRESS AVE
5TH ST
6TH ST
11TH ST
5TH CT
17TH ST

HOPKINS ST
19TH ST

HARPER AVE

MYRTLE AVE

BARD ST
ALLEY
6TH CT
3RD ST

PORTER LN
21ST CT

GENTRY ST
7TH ST
7TH CT
3RD ST

PINE ST
6TH ST

NEPTUNE
8TH CT
33RD PL
9TH CT
35TH ST
10TH ST
9TH ST
10TH CT
VA
L
L
E
Y
PA
R
K
AV
E
20TH CT
11TH CT
15TH CT
6TH ST

SILVER ST
C
A
M
PA
N
A
S
T
11TH PL
7TH ST
4TH ST

CIRCLEDR

HILL ST
19TH CT
1ST CT
ALLEY
16TH ST
24TH ST
BAYVI
EW
D
R

LOMA DR

MASSEY AVE
28TH CT
33RD ST
P
O
W
E
R
ST
18TH ST
16TH CT
18TH CT
29TH CT
8TH PL
17TH CT

EL OESTE
D
R

SUNSET DR

PIER PLAZA

AVA AVE

LOMA DR
OAK ST
27TH CT

GOLDEN AVE
20TH PL

CORONA ST

SPRINGFIELD AVE
LOMA
D
R
11TH ST
10TH ST
20TH ST
TH
E
STRAN
D
1ST PL
19TH ST

SILVERSTRAND AVE
8TH ST
15TH ST
13TH ST

CYPRESS AVE
1ST PL

HERONDO ST
24TH ST
4TH ST
9TH ST

GOULD TER
H
I
L
L
C
R
E
S
T
D
R
24TH PL

BOUNDARY PL
12 20
16 16
19 19
19 19
19 19
19 19 19 19 19 19
1 9
01 04
03 05
02 08
11 B
07 13 A
11 A
14 A
15 17
10 A
18 10 B
09 13 B
21 14
B
Public Parking Lots
Street Parking
Metered Street Parking
2 Hour
3 Hour
24 Hour
24 Minute Green Zone Meters
Impacted Area
Beach
Parks
City of Hermosa Beach
Public Parking Locations
0 0.13 0.25 0.5 Miles
±
Updated: 10/10/2024 Page 553 of 1852
1 Lot A 1101 Hermosa Ave. Lot Northwest corner of 11th
St. 139 5 No Parking Mon., Wed., Fri., Sat., Sun.: 5 AM - 6 AM 3 hours $2.00/hr 2 AM - 8 PM, $2.50/hr 8 PM - 2 AM.

Monthly permits: $250/month, valid anytime, 72 hr
maximum. Daily passes: $150/month, valid 5 AM - 7 PM.

Seasonal/Special events rate may vary.
2 Lot B 59 13th Ct. Lot West of Hermosa Ave.,
behind Bijou Building 35 2 3 hour parking 10 AM-2AM; No parking Mon.: 6 AM - 7AM 3 hours $2.00/hr 10 AM - 8 PM, $2.50/hr 8 PM - 2AM.

Monthly permits: $250/month, valid anytime, 72 hr
maximum. Daily passes: $150/month, valid 5 AM - 7 PM.

Seasonal/Special events rate may vary.
3 Lot C 1301 Hermosa Ave. Lot
Municipal Parking
Structure: Between 13th
St. & 14th Ct.
299 7 No parking Mon., Fri.: 6 AM - 7 AM;
Charging stalls on roof 3 hours
$2.00/ hr 2 AM - 8 PM, $2.50/hr 8 PM - 2 AM.

Monthly permits: $250/month, valid anytime, 72 hr
maximum. Daily passes: $150/month, valid 5 AM - 7 PM.

Seasonal/Special events rate may vary.
4 Lot D 1331 Manhattan Ave. Lot
Southwest corner of
Manhattan Ave. and
14th St.
19 1 2 hour parking: 10 AM - 2 AM; No parking
Fri. 8 AM - 9 AM
2 hours & 24
hours
$2.00/hr 10 AM - 8 PM, $2.50/hr 8 PM - 2 AM (Silver
Meters). $2.00/hr (Yellow Meters).
5 Lot E 737 2nd St. Lot
West of PCH/ North of
2nd St., behind
commercial building
24 1 2 hour parking: 7 AM - 6 PM; No
parking: Thur 7:30am - 8:30am 2 hours Free
7 Lot G 800 Block 4th St. Lot 4th St., between PCH and
Ocean View Ave. 10 0 No parking Wed.: 8 AM - 12 PM 2 hours $2.00/ hr 10 AM - 8 PM, $2.50/hr 8 PM - 2 AM. 8 Clark Building,
Field & Stadium
861 Valley Dr. & 1035 Valley
Dr. Lot
Parking lot south of 11th
St. Parking west side of
Valley Dr. near Clark
Building south of the
park
28 2
12 hour parking; No parking Fri.: 8
AM - 9 AM (Farmer Market's Vendor
Parking 9 AM - 5 PM); No parking 2
AM - 6 AM
12 hours Free
9 Hermosa
Greenbelt East side Valley Dr. Lot
East side of Valley Dr.,
between 11th St. & 8th
St. along Greenbelt
75 2
12 hour parking; No parking Thurs 7 AM -
8 AM; Fri. 10 am - 4 pm max. 2 hour
parking for Farmer's Market
12 hours Free
10A City Yard Parking 555 6th St. Lot North side of 6th St. 14 0 City Employee Parking Only
6AM - 6 PM
Mon - Fri; Public Parking After 6pm
Weekends, Evenings and Holidays
72 hours Free
10B City Yard Adjacent 555 6th St. Lot Just north of the City Yard along Valley Dr. 6 0
No parking 7 AM - 8 AM, 12 hour parking,
spaces (3 north/3 south) closest to Valley
Dr
12 hours Free
11A South Park
(Upper) 500 Valley Dr. Lot West side of South Park, accessed via Loma Dr. 9 1 6 hour parking weekends & holidays; No Parking 7 PM - 8 AM 6 hours Free Public Parking 8am-1pm, P.A.R.K. Program Only 1pm-7pm ID Name Address Notes Type Parking Cost Total # of
Spaces Spaces Info Parking Time Limits
ADA
Spaces

Page 554 of 1852 ends

ID Name Address Notes Type Parking Cost Total # of
Spaces Spaces Info Parking Time Limits
ADA
Spaces
11B
South Park
(Lower) 500 Valley Dr. Lot West side of Valley Dr., North of 2nd St. 33 2 6 hour parking; 10 AM - 10 PM; No Parking 10:30 PM to 5 AM 6 hours Free 12 South Valley Dr Next to South Park Street Parking Street Parking 14 0 72 hours max.; No parking Wed. 8 AM – 12 PM 72 hours Free
13A Community Center
Parking 710 Pier Ave. Lot
Southeast corner of
Ardmore Ave. & Pier
Ave.
98 3 No Parking 2 AM - 6 AM Free
13B Community Center
Parking (11th Pl) 11th Pl, west of PCH Street Parking
11th Pl, west of PCH, in
south east area of
Community Center
13 5 2 hours 7 AM - 7 PM, No Parking Thurs 8
AM - 12 Noon 2 hours Free
14A
City Hall Parking
(in front of City
Hall)
1315 Valley Dr. Lot Lot in front of City
Hall/Library 48 4
City Hall Lot: No Parking Fri 6 AM - 7PM;
3 hour parking 7 AM - 9 PM; 12 hour
parking Fri/Sat/Sun; No Parking 2 AM - 6
AM
3 hours & 12
hours Free
14B
City Hall Parking
(in adjacent lot) 1315 Valley Dr. Lot Lot adjacent to City Hall (east half of storage lot) 28 0 No Parking Fri 6 AM - 7 AM; City
Employee Parking 6:30 - 6 PM MonThurs; 12 hour Public Parking after 6 PM, Fri, Evenings, Weekends, Holidays; No
Parking 2 AM - 6 AM
12 hours Free
15 Valley Park/Gould
Avenue
401 Gould Ave. Lot South side of Gould Ave 39 4 No parking Mon. 8 AM - 12 Noon; No parking 10:30 PM - 5 AM N/A Free
16 Upper Pier Ave 100-700 blocks of Pier Ave. and
Bard St.

Metered
Street Parking
Between Hermosa Ave &
PCH 151 3
101 spaces 2 hour parking; 24 spaces 3
hours parking. No parking: Mon., Wed.,
Fri., Sat., Sun.: North 6-630am South
6:30 AM -7 AM
2 hours & 3
hours $2.00/hr 10 AM - 8 PM, $2.50/hr 8 PM - 2 AM
17 Kiwanis Club 2515 Valley Dr. Lot West side of Valley Dr, attached to Valley Park 30 4 6 hours 6 hours Free
18 Greenwood Park Northwest PCH/Aviation Ave. Lot Spaces along park, across from Starbucks 20 1 1 hour parking 6 AM - 9 PM. 2 hour maximum in charging stalls 1 hour Free 20 Ardmore Ave. East side of Ardmore
Ave./South of Pier Ave. Street Parking East side of Ardmore Ave. 34 2 72 hour max.; No parking: Wed. 10 AM - 2 PM 72 hours Free 19 Hermosa Ave. 0-3400 blocks of Hermosa Ave. East/West side and medians
Metered
Street Parking
78 spaces 2 hour parking; 90 spaces 3
hour parking; 737 spaces 24hr parking
$2.00/hr 10 AM - 8 PM, $2.50/hr 8 PM - 2 AM (Silver
905 Meters). $2.00/hr (Yellow Meters).
2 hours, 3
hours & 24
hours

Page 555 of 1852 ends

ID Name Address Notes Type Parking Cost Total # of
Spaces Spaces Info Parking Time Limits
ADA
Spaces
21 Hermosa Vista
School Parking 417 25th St Lot
School Parking -
Available during nonschool hours41 2 No parking 7 AM to 6 PM on school days 3 hours Free. On-site school parking is available to the public on weekends, school holidays, and the summer season
between the last and first day of the regular school year, at all times except between 2:00 AM & 4:00 AM of any
day, with no maximum stay. On school days during the
regular school calendar are available from 6:00 PM to
7:00 AM for a maximum of 3 hours.

Unit Blocks Between Strand and Hermosa
Ave
Metered
Street Parking Near Hermosa Ave 94 2hr, 3hr, and 12 hr meter parking; No Parking times vary 2 hours 3
hours &
12hr
$2.00/hr 10 AM - 8 PM, $2.50/hr 8 PM - 2 AM (Silver
Meters). $2.50/hr (Yellow Meters).
2st, 10st, 11st, 14st, 15st, 22st
100 Blocks Between Hermosa and Valley Metered
Street Parking East of Hermosa 425 2hr, 3hr, and 12 hr meter parking; No Parking times vary 2 hours 3
hours &
12hr
$2.00/hr 10 AM - 8 PM, $2.50/hr 8 PM - 2 AM (Silver
Meters). $2.00/hr (Yellow Meters).

Page 556 of 1852 ends

DISCUSSION ON DOWNTOWN

PARKING LOT REGULATIONS

INCLUDING THE EMPLOYEE

PARKING PERMIT PROGRAM
February 25, 2025

Page 557 of 1852 ends

Employee Parking Permit Program
 Program began in 1982
 Parking Management Study (2019)
o On-Street vs Off-Street
 Current Rates (Feb 2023)
o Yellow post $175 per year;
o All 3 levels of Lot C - 24 hours a day for $75 per month; and o All 3 levels of Lot C - Daytime – 5am-7pm for $38 per month.

Page 558 of 1852 ends

Employee Parking Permit Program

Page 559 of 1852 ends

Lot A Transaction History (139 Spaces)

Page 560 of 1852 ends

Lot B Transaction History (35 Spaces)

Page 561 of 1852 ends

Lot C Transaction History (299 Spaces)

Page 562 of 1852 ends

Downtown Parking Lot Regulations
Pre-COVID, Lots A, B, and C were 24-hr
lots
Health Order Restricted Parking to 3-hr
max

Page 563 of 1852 ends

DISCUSSION ON DOWNTOWN

PARKING LOT REGULATIONS

INCLUDING THE EMPLOYEE

PARKING PERMIT PROGRAM
February 25, 2025

Page 564 of 1852 ends

City of Hermosa Beach | Page 1 of 6
Meeting Date: February 25, 2025
Staff Report No. 25-CA-002
Honorable Mayor and Members of the Hermosa Beach City Council

INTRODUCTION OF AN ORDINANCE REPEALING HERMOSA BEACH MUNICIPAL CODE (“HBMC”) SECTIONS 12.28.010 AND 12.20.240 AND ADDING CHAPTER

12.40 TO THE HBMC REGULATING CAMPING IN PUBLIC AREAS
CEQA: Determine the Ordinance is exempt from the California environmental Quality Act.
(City Attorney Patrick Donegan and Deputy City Manager Angela Crespi) Recommended Action:

Staff recommends City Council:

1. Introduce by title only and waive first reading of an Ordinance of the City of Hermosa Beach, California, (Attachment 1) repealing Hermosa Beach Municipal Code (“HBMC”) sections 12.28.010 and 12.20.240 and adding Chapter 12.40 to the HBMC regulating camping in public areas and finding the ordinance is exempt from the California Environmental Quality Act (“CEQA”); and

2. Direct the City Clerk to publish a summary ordinance.

Executive Summary:

As requested by the City Council at its October 8, 2024 meeting, staff presents this ordinance addressing camping in public areas in the City (including in vehicles) and the blocking of public access by those sleeping, laying, or placing personal property in the City. The proposed ordinance would repeal two existing HBMC code sections dealing with camping in certain places (the Strand, beach, and City parks) and would create a dedicated chapter (Chapter 12.40) in the HBMC to holistically regulates camping and its related issues on a City-wide basis. The ordinance proposes, among other remedies, that violations of Chapter 12.40 may be subject to the City’s administrative citation process.

Background:

At its September 10, 2024 meeting, Councilmember Detoy requested, and Mayor Pro Tem Saemann and Mayor Francois supported, a future agenda item to discuss the Grants Pass Supreme Court decision regarding camping in public areas. At its October 8, 2024 meeting, the City Council received a report on the issue and requested staff return with a comprehensive Hermosa Beach Municipal Code amendment to regulate camping in public places in light of the recent Grants Pass decision.

Existing prohibitions on camping in the City are found in two parts of the Hermosa Beach Municipal Code (“HBMC”).

Page 565 of 1852 ends

City of Hermosa Beach | Page 2 of 6
HBMC section 12.28.010 prohibits the public camping in City parks and states that:
“Within the limits of any public park or playground, no person shall: . . .

H. Camp or lodge, except in municipal automobile camps designated as such by the city manager”
HBMC section 12.20.240 regulates camping on the Strand or beach and states:
“No person shall camp on or use for overnight sleeping purposes any portion of the beach or Strand, or bring a house trailer or similar vehicle onto the beach or Strand, and a violation of this section shall be an infraction.” While not applicable in every public place in the City, the above stated HBMC provisions constitute the City’s current regulatory regime as it pertains to camping in the City and prohibition of camping in City parks and the Beach/Strand. However, over the past few years there have been some pertinent court cases dealing with local regulation on camping that up until the most recent Grants Pass Supreme Court decision, restricted or narrowed what local cities in California could do to regulate public camping.

The two Ninth Circuit Court of Appeal cases that significantly narrowed the permissible scope of local regulation of public camping were the Martin v. City of Boise (“Martin”) and Johnson v. City of Grants Pass (“Johnson”) decisions.

In Martin, homeless individuals sued the City of Boise, Idaho, after being criminally prosecuted under city ordinances banning public camping. As relevant here, the Ninth Circuit held that the Cruel and Unusual Punishment Clause of the Eighth Amendment “prohibits the imposition of criminal penalties for sitting, sleeping or lying outside on public property for homeless individuals who cannot obtain shelter.” Subject to some exceptions, Martin prohibited cities from arresting homeless individuals for involuntarily sitting, lying or sleeping in public when the city does not provide a shelter bed in its “jurisdiction” for that potential arrestee. In December 2019, the Supreme Court denied Boise’s petition to review this decision.

The Johnson decision came later and involved two Grants Pass, Oregon, camping regulations. The first allowed sleeping in public, but prohibited the use of “bedding, [a] sleeping bag, or other material used for bedding purposes.” The city argued that Martin’s holding was limited to prohibitions on sleeping in public. And on that basis, the city maintained that local regulations—such as a complete prohibition on the use of bedding, sleeping bags and related items—were permissible. The Ninth Circuit disagreed and concluded that the “only plausible reading” of the term “sleeping” in the context of Martin is that it “includes sleeping with rudimentary forms of protection from the elements.” The second regulation involved the city’s enforcement framework in light of Martin’s prohibition on imposing “criminal penalties for sitting, sleeping or lying outside on public

Page 566 of 1852 ends

City of Hermosa Beach | Page 3 of 6
property . . . .” Grants Pass preceded criminal enforcement by issuing civil penalties that— if violated—could then be punished criminally. The Ninth Circuit rejected this approach, reasoning that Martin’s holding applies to civil citations where “the civil and criminal punishments are closely intertwined.”
At its core, the question addressed in Grants Pass was whether “one specific provision of the Constitution—the Cruel and Unusual Punishments Clause of the Eighth Amendment—prohibits the enforcement of public-camping laws.” The Supreme Court said no.

The Court explained that the Eighth Amendment’s Cruel and Unusual Punishments Clause was adopted to “ensure that the new Nation would never resort” to formerly tolerated punishments considered to be “‘cruel’ because they were calculated to ‘superad[d] terror, pain, or disgrace’ and considered ‘unusual’ because by the time of the Amendment’s adoption, they have ‘long fallen out of use.’” The Court added that the Eighth Amendment is focused on “the method or kind punishment” that a “government entity may impose for the violation of criminal statutes”—not “whether a government may criminalize particular behavior in the first place or how it may go about securing a conviction for that offense.”
The Court observed that Grants Pass’s civil-then-criminal punishment framework was not “cruel and unusual” because the city imposed limited civil fines for first-time offenders, non-criminal stay away orders from public parks for repeat offenders, and a maximum sentence of 30 days in jail for those who violated the orders. The Court reasoned that this scheme of fines and jail time is a common practice among municipalities nationwide, who impose “similar punishments for similar offenses.”
The Court also rejected the Ninth Circuit’s rationale in Martin and Johnson that public camping ordinances (like Grants Pass’s) violate the Eighth Amendment by criminalizing an individual’s “status” as a homeless person. The Court observed that the camping laws at issue were not “status” crimes because they criminalized conduct (i.e., camping in public) and violations could occur regardless of whether the “charged defendant is homeless, a backpacker on vacation passing through town, or a student who abandons his dorm room to camp out in protest on the lawn of a municipal building.” In sum, the Supreme Court observed that the “Eighth Amendment serves many important functions, but does not authorize federal judges to wrest those rights and responsibilities from the American people and in their place dictate this Nation’s homelessness policy.” Past Council Actions
Meeting Date Description
September 10, 2024 Councilmember Detoy requested, and Mayor Pro Tem Seamann and Mayor Francois supported, a future agenda

Page 567 of 1852 ends

City of Hermosa Beach | Page 4 of 6
Meeting Date Description
item regarding the City’s current regulations on public camping and possible regulatory options in light of the Grants Pass decision.

October 8, 2024 City Council gave direction to bring back a comprehensive Hermosa Beach Municipal Code amendment to regulate
camping in public places in light of the recent Grants Pass decision.

Discussion:

The Supreme Court’s Grants Pass decision overruled the Ninth Circuit’s decisions in Martin and Johnson. Consequently, cities within the Ninth Circuit’s jurisdiction (which includes all of California) are now free to enact and enforce laws regulating public camping and to address possible other causes and conditions of homelessness in their respective jurisdictions. As such, the proposed ordinance would repeal the pertinent language in HBMC sections 12.20.240 and 12.28.010 dealing with camping and would create a new dedicated Chapter in the HBMC dealing with camping—Chapter 12.40.

As proposed, Chapter 12.40 would prohibit camping (as defined below) citywide in prohibited public places (also defined in the ordinance) and includes a prohibition on using a vehicle for human habitation in prohibited public places. Further, this Chapter would prohibit the starting or using of a fire in prohibited public places and prohibits the camping, sleeping, lying, or storage of personal property in a way that obstructs public access or within 20 feet of any entrance or exit to certain buildings. Finally, violations of this Chapter would be subject to the City’s administrative citation process.

Camp is defined as:
“Camp” means to use property for living accommodation purposes or to use a vehicle for human habitation. A person shall be considered to be using property for living accommodation purposes if the person admits they are camping; the person is using a camp facility or camping paraphernalia between the hours of 10:00 p.m. and 6:00 a.m. to live outdoors or remain outdoors overnight; or, based on the totality of the circumstances, it is established that a person is using the property to live, dwell or reside, which is exemplified by the person sleeping or preparing to sleep outdoors; the person having with them damaged recreational equipment that cannot be used for its intended purpose; the person having with them camp stoves, pots, pans, or other cooking equipment in an area that is not designated for cooking; the person having with them a sleeping bag, sleeping pad, blanket, pillow, bedroll or other similar bedding; the person having with them trash, recyclables, rubbish, or other garbage; the person having with them human waste, animal waste or medical waste that is stored in buckets, bottles or similar containers; and/or the person bathing or grooming themselves outside of facilities designated for these purposes. A person shall be considered to be using a vehicle for human

Page 568 of 1852 ends

City of Hermosa Beach | Page 5 of 6
habitation if: the person admits they are using the vehicle to camp; or, based on the totality of the circumstances, it is established that a person is using the vehicle to live, dwell or reside, which is exemplified by the person continuously remaining inside the vehicle at the same location for three hours or more; the person sleeping in the vehicle; the inability of a person outside the vehicle to view through two or more windows because the view is limited or blocked; the inability to use seating in the vehicle because a large volume of personal belongings, trash, rubbish, or garbage is stored in the vehicle; the person preparing or cooking meals inside or on the vehicle; the person bathing or grooming inside the vehicle; the storage of items inside or on a vehicle that are not associated with ordinary use of the vehicle such as a sleeping bag, bedroll, blanket, sheet, pillow, kitchen utensil, cookware, cooking equipment or furniture; the use of buckets, bottles or similar containers to hold bodily fluids; and/or having furniture set up in or around the vehicle, such as chairs, tables, umbrellas or portable cooking equipment. This list of circumstances is not exhaustive and the totality of the circumstances shall govern.” Practically, while the Grants Pass decision and the proposed Chapter 12.40 are steps in the right direction in terms of local control, staff cautions that these would not be a cureall for this issue in the City. While some may be discouraged by any local regulations, others in this subset of the population that may violate the proposed Chapter 12.40 may be undeterred by the threat, or issuance, of an administrative citation.

Formal enforcement processes (i.e., administrative citation/criminal charges, etc.) alone will oftentimes not be enough when dealing with this subset of the population for a variety of reasons and will divert limited police and CSO resources away from other pressing issues. Enforcement will be an ongoing challenge and any criminal penalties are subject to review and analysis by the pertinent prosecuting authorities.

While this may be one tool the City may use to address this issue in the City, the City Council and the public should understand that this will likely continue to be an issue in the City. The City will continue to take a “care first” approach seeking to provide mental health, housing services, and other services aimed at addressing the underlying causes of homelessness. City staff will continue to pursue multiple avenues and collaborative efforts with our governmental and non-profit partners to address this complex challenge including: HB Cares, Mobile Mental Health Team; Harbor Interfaith housing outreach services through the Beach Cities Partnership; Los Angeles County Department of Mental Health, MET Team deployment; the Housing Initiative Court and CitiNet Homeless Survey with Redondo Beach.

Environmental Review:

The adoption of this ordinance is exempt from the California Environmental Quality Act (CEQA) pursuant to State CEQA Guidelines section 15061(b)(3) of CEQA in that there is no potential for this ordinance to cause a significant effect on the environment. Further, it

Page 569 of 1852 ends

City of Hermosa Beach | Page 6 of 6
can be seen with certainty that there is no possibility that the ordinance may have a significant effect on the environment. No exceptions to the exemption apply General Plan Consistency:

This report and associated recommendation have been evaluated for their consistency with the City’s General Plan. Relevant Policies are listed below:

Governance Element
Goal 1. A high degree of transparency and integrity in the decision-making process.

Policy:
 1.4 Consensus oriented. Strive to utilize a consensus-oriented decision-making process.

Goal 2 The community is active and engaged in decision-making processes.

Policy:
 2.6 Responsive to community needs. Continue to be responsive to community inquiries, providing public information and recording feedback from community interactions.

Land Use Element
Goal 2 Neighborhoods provide for diverse needs of residents of all ages and abilities, and are organized to support healthy and active lifestyles.

Policy:
 2.6 Neighborhood preservation. Preserve and enhance the quality of residential neighborhoods by avoiding or abating the intrusion of disruptive, nonconforming buildings and uses
Fiscal Impact:

There are no fiscal impacts associated with the recommended actions.

Attachment:

Draft Ordinance
Respectfully Submitted by: Patrick Donegan, City Attorney Noted for Fiscal Schedule: Brandon Walker, Administrative Services Director Legal Review: Patrick Donegan, City Attorney
Reviewed By: Angela Crespi, Deputy City Manager
Approved: Suja Lowenthal, City Manager

Page 570 of 1852 ends
Page 1 of 7 ends

CITY OF HERMOSA BEACH
ORDINANCE NO. ORD-25-XXXXU

AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF HERMOSA

BEACH, CALIFORNIA, REPEALING HERMOSA BEACH MUNICIPAL CODE (“HBMC”) SECTIONS 12.28.010 AND 12.20.240 AND ADDING CHAPTER

12.40 TO THE HBMC REGULATING CAMPING IN PUBLIC AREAS AND

FINDING THE ORDINANCE IS EXEMPT FROM THE CALIFORNIA
ENVIRONMENTAL QUALITY ACT (“CEQA”).

THE CITY COUNCIL OF THE CITY OF HERMOSA BEACH DOES HEREBY ORDAIN AS FOLLOWS:

SECTION 1. Within the City of Hermosa Beach (“City”) and other cities in the surrounding region, and throughout the State of California, there is a significant number of people experiencing homelessness.

SECTION 2. Homeless persons sometimes camp, sleep, or lie on public or private property, particularly if they have no other place to sleep.

SECTION 3. Camping and or sleeping in certain areas within the City can create unsanitary, unhealthy, and dangerous conditions that risk the public health and safety SECTION 4. The Legislature of the State of California has, in Government Code sections 65302, 65560, and 65800, conferred upon local governments the authority to adopt regulations designed to promote the public health, safety, and general welfare of its residents.

SECTION 5. In April of 2019, the United States Court of Appeals, Ninth Circuit, issued a decision in Martin v. City of Boise (9th Cir. 2019) 920 F.3d 584, which held in part that “the Eighth Amendment prohibits the imposition of criminal penalties for sitting, sleeping, or lying outside on public property for homeless individuals who cannot obtain shelter” (Martin, 920 F.3d at 616.)

Page 571 of 1852 ends
Page 2 of 7 ends

SECTION 6. In June of 2024, the Supreme Court issued its opinion in City of Grants Pass, Oregon v. Johnson (2024) 144 S.Ct. 2202, which struck down the Ninth Circuit’s opinion in Martin, and authorized cities to regulate camping on public property as one of the “tools in the policy toolbox” when addressing housing and homelessness.

SECTION 7. Certain City Municipal Code provisions address camping in certain areas of the City (i.e., in City parks and on the Strand or beach); however, there is no comprehensive HBMC program that regulates the sleeping and/or camping in the City in a holistic way.

SECTION 8. The City Council finds that there is a need to regulate the sleeping or camping in public areas in the City in a singular place in the HBMC to address situations that create a substantial danger to the City’s residents and visitors.

SECTION 9. Reasonable prohibitions on camping on public property serves the additional benefit of encouraging the unhoused population to accept shelter when offered and receive support or treatment helpful in escaping the cycle of homelessness.

SECTION 10. The City Council desires to repeal certain sections of the HBMC and adopt a new HBMC chapter to regulate the sleeping or camping on public property in the City in a singular HBMC chapter.

SECTION 11. Section 12.20.240 of the Hermosa Beach Municipal Code is hereby repealed in its entirety:
“12.20.240 Overnight camping.

No person shall camp on or use for overnight sleeping purposes any portion of the beach or Strand, or bring a house trailer or similar vehicle onto the beach or Strand, and a violation of this section shall be an infraction.”
SECTION 12. Section 12.28.010 (H) of the Hermosa Beach Municipal Code is hereby repealed in its entirety and the remaining subsections are re-numbered accordingly:
“12.28.010 Park regulations generally.

Page 572 of 1852 ends
Page 3 of 7 ends

Within the limits of any public park or playground, no person shall. . . (H) Camp or lodge, except in municipal automobile camps designated as such by the city manager. . . “
SECTION 13. Chapter 12.40 (Camping in Public Places and Interfering with Public Access) is hereby added to the Hermosa Beach Municipal Code to read as follows:
“12.40.010 Camping in Public Prohibited—Purpose
The public roads, parks, recreation areas, the Strand, beaches and all other open spaces and public property within the City should be readily accessible to residents and the public at large. The use of these areas for camping purposes interferes with the rights of others to use these areas for the purposes for which they were intended and can create public health and safety risks for the residents and detrimental impacts to the environment. The purpose of Sections 12.40.010 through 12.40.030 is to maintain public property in a safe, clean, and accessible condition for the benefit of the public at large.

12.40.020 Definitions
For purposes of this chapter, the following words and phrases shall have the meaning set forth in this section:
“Camp” means to use property for living accommodation purposes or to use a vehicle for human habitation. A person shall be considered to be using property for living accommodation purposes if the person admits they are camping; the person is using a camp facility or camping paraphernalia between the hours of 10:00 p.m. and 6:00 a.m. to live outdoors or remain outdoors overnight; or, based on the totality of the circumstances, it is established that a person is using the property to live, dwell or reside, which is exemplified by the person sleeping or preparing to sleep outdoors; the person having with them damaged recreational equipment that cannot be used for its intended purpose; the person having with them camp stoves, pots, pans, or other cooking equipment in an area that is not designated for cooking; the person having with them a sleeping bag, sleeping pad, blanket, pillow, bedroll or other similar bedding; the person having with them trash, recyclables, rubbish, or other garbage; the person having with them human waste, animal waste or medical waste that is stored in buckets, bottles or similar containers; and/or the person bathing or grooming themselves outside of facilities

Page 573 of 1852 ends
Page 4 of 7 ends

designated for these purposes. A person shall be considered to be using a vehicle for human habitation if: the person admits they are using the vehicle to camp; or, based on the totality of the circumstances, it is established that a person is using the vehicle to live, dwell or reside, which is exemplified by the person continuously remaining inside the vehicle at the same location for three hours or more; the person sleeping in the vehicle; the inability of a person outside the vehicle to view through two or more windows because the view is limited or blocked; the inability to use seating in the vehicle because a large volume of personal belongings, trash, rubbish, or garbage is stored in the vehicle; the person preparing or cooking meals inside or on the vehicle; the person bathing or grooming inside the vehicle; the storage of items inside or on a vehicle that are not associated with ordinary use of the vehicle such as a sleeping bag, bedroll, blanket, sheet, pillow, kitchen utensil, cookware, cooking equipment or furniture; the use of buckets, bottles or similar containers to hold bodily fluids; and/or having furniture set up in or around the vehicle, such as chairs, tables, umbrellas or portable cooking equipment. This list of circumstances is not exhaustive and the totality of the circumstances shall govern. “Camp facility” or “camp facilities” means any or a combination of the following: a tent, hut, other temporary physical structure or shelter, cot, bed, or hammock. “Camping paraphernalia” means items that facilitate living outside including items that are used for: sleeping, such as sleeping bags, sleeping pads, blankets, pillows, bedrolls, or other similar bedding; cooking, such as camp stoves, pots, pans, or other cooking equipment; storage, such as backpacks, luggage, or coolers; sitting, such as moveable chairs; and lighting, such as headlamps, a lantern, or flashlights. “Prohibited public place” means any public property that is not designated for camping by formal action of the City Council, the written consent of the City Manager, the provisions of this Code, or a validly issued City permit authorizing such activity or other governmental entity having jurisdiction over the property. “Public property” means all property owned or controlled by the State, the County, the City, or other public entity including, but not limited to, any publicly owned or controlled building, structure, restroom, the Strand, beach, parking garage, parking lot, passageway, pier, public rights-of-way, driveway, landscaped area, parkway, median, the Greenbelt, open space, public park, or park facility.

Page 574 of 1852 ends
Page 5 of 7 ends

“Public rights-of-way” or “public right-of-way” means the area or areas on, below, or above a public roadway, public, highway, public street, public sidewalk, public path, public trail, public square or plaza, public bike lane or path, public boardwalk, public alleyway, or a utility easement in which the City has interest.
“Store” means to put aside or to keep, to accumulate for use when needed, or to put for safekeeping.
“Vehicle” means a “motor vehicle” as defined by Cal. Veh. Code Section 415, a “recreational vehicle” as defined by Cal. Health & Saf. Code Section 18010(a), a “camper trailer” as defined in Cal. Veh. Code Section 242, a “house car” as defined in Cal. Veh. Code Section 362 or a “trailer coach” as defined in Cal. Veh. Code Section 635.

12.40.020 Camping in Prohibited Places or Interfering with Public Access A. No person shall camp in a prohibited public place.

B. No person shall start, build, or use a fire in a prohibited public place for any purpose including, but not limited to, warming or cooking, unless authorized or permitted to do so by formal action of the City Council, the written consent of the City Manager, the provisions of this Code, or a validly issued City permit authorizing such activity.

C. No person shall camp, sleep, lie, or place personal property where such activity:
(1) Obstructs or impedes passage, as required by the Americans with Disabilities Act; or
(2) Is within twenty feet of an entrance or exit to any building, establishment, retail store, restaurant, office building or other place into which the public is invited; or
(3) In a manner that unreasonably interferes with the use of the public right of way by motor vehicles, pedestrians or bicycles.

12.40.030 Violation
Any person violating any provision of this Chapter shall be subject to the enforcement provisions of Chapter 1.04 and shall be subject to a civil administrative penalty pursuant to Chapter 1.10. Each person shall be deemed guilty of a separate offense for each and

Page 575 of 1852 ends
Page 6 of 7 ends

every day or portion thereof during which any violation of this Chapter is committed, continued, or permitted.

SECTION 14. Section 1.10.040 of the Hermosa Beach Municipal Code is hereby amended to add the following subsection (A)(40) to subject violations of Chapter 12.40 to the City administrative citation penalty procedures:
“1.10.040 Code violations subject to administrative penalty procedures.

A. The violations described in the Municipal Code titles, chapters and sections listed hereinbelow are subject to the administrative penalty procedures and other provisions of this chapter: . . .
(40) Chapter 12.40 (Camping in Public Places and Interfering with Public Access) SECTION 15. Severability. If any section, subsection, subdivision, sentence, clause, phrase, word, or portion of this Ordinance is, for any reason, held to be invalid or unconstitutional by the decision of any court of competent jurisdiction, such decision shall not affect the validity of the remaining portions of this Ordinance. The City Council hereby declares that it would have adopted this Ordinance and each section, subsection, subdivision, sentence, clause, phrase, word, or portion thereof, irrespective of the fact that any one or more sections, subsections, subdivisions, sentences, clauses, phrases, words or portions thereof be declared invalid or unconstitutional.

SECTION 16. Environmental Review. The adoption of this ordinance is exempt from the California Environmental Quality Act (CEQA) pursuant to State CEQA Guidelines section 15061(b)(3) of CEQA in that there is no potential for this ordinance to cause a significant effect on the environment. Further, it can be seen with certainty that there is no possibility that the ordinance may have a significant effect on the environment. No exceptions to the exemption apply.

SECTION 17. Certification. The City Clerk is directed to certify the passage and adoption of this Ordinance; cause it to be entered into the City’s book of original ordinances; make a note of the passage and adoption in the records of this meeting; and, within fifteen (15) days after the passage and adoption of this Ordinance, cause it to be published or posted in accordance with California law.

Page 576 of 1852 ends
Page 7 of 7 ends

PASSED, APPROVED and ADOPTED on this 25th day of February, 2025.

AYES:

NOES:

ABSTAIN:

ABSENT:

Mayor Dean Francois
PRESIDENT of the City Council and MAYOR of the City of Hermosa Beach, CA ATTEST: APPROVED AS TO FORM:
________________________________ ________________________________ Myra Maravilla Patrick Donegan
City Clerk City Attorney

Page 577 of 1852 ends

INTRODUCTION OF AN ORDINANCE

REPEALING HERMOSA BEACH MUNICIPAL
CODE SECTIONS 12.28.010 AND 12.20.240
AND ADDING CHAPTER 12.40 TO THE HBMC

REGULATING CAMPING IN PUBLIC AREAS
CEQA: DETERMINE THE ORDINANCE IS EXEMPT

FROM THE CALIFORNIA ENVIRONMENTAL

QUALITY ACT
February 25, 2025

Page 578 of 1852 ends

Background
 During the September 10, 2024 City Council meeting,
Councilmember Detoy requested, and then Mayor Pro
Tem Saemann and Mayor Francois supported, future
agenda item pertaining to the recent U.S. Supreme Court decision in Grants Pass regarding public camping as well as other issues related to the City’s unhoused population.  At its October 8, 2024 meeting, the City Council received a report on the issue and requested staff return with a comprehensive Hermosa Beach Municipal Code
amendment to regulate camping in public places in light of the recent Grant’s Pass decision.

Page 579 of 1852 ends

Background
 The City’s existing regulations pertaining to
public camping are codified in HBMC sections

12.20.240 and 12.28.010:
 No person shall camp on or use for overnight sleeping purposes any portion of the beach or Strand, or bring a house trailer or similar vehicle onto the beach or Strand, and a violation of this section shall be an infraction.
 Within the limits of any public park or playground, no person shall: . . .

H. Camp or lodge, except in municipal automobile camps
designated as such by the city manager

Page 580 of 1852 ends

Background
 So upshot is that existing Hermosa Beach Municipal Code provisions regulate and prohibit public camping on the
beach and public parks and playgrounds – not every
public place in the City.
 Prior to the U.S. Supreme Court decisions in City of Grants Pass, Oregon v Johnson, et al., there were 9th Circuit
(Federal Appellate Court applicable to the City) cases that dealt with local regulation on camping that are necessary to understand to get full meaning of Grant’s Pass

Page 581 of 1852 ends

Background
 Martin v. City of Boise and Johnson v. City of Grants Pass decisions:
 Boise case prohibited public camping and 9th Circuit held that arresting homeless individuals for involuntarily sitting, lying or sleeping in public when the city does not provide a shelter bed in its “jurisdiction” for that potential arrestee violated the Cruel and Unusual Clause of the US Constitution
 Johnson case, prohibited use of bedding/sleeping base or other material and had a regulatory framework where civil penalties first – culminating in criminal punishment. 9th Circuit rejected both of these approaches on Constitutional grounds

Page 582 of 1852 ends

Discussion – Grants Pass Decision
 So the core question taken up by the Supreme Court in Grant’s Pass, was whether this civil-then-criminal
framework was cruel and unusual?
 Answering in the negative, the Court held that the 8th Amendment was focused on the method or kind
punishment” that a government entity may impose for
the violation of criminal statutes—not “whether a
government may criminalize particular behavior in the
first place.
 Further, the Court held that the camping ordinance in in question did not criminalize status – it equally applied to anyone engaged in that conduct whether the person
was homeless or not.

Page 583 of 1852 ends

Discussion – Grants Pass Decision
 So what this meant for local jurisdictions is that
this idea of having to provide a shelter bed or
something to that effect no longer curtailed
the right to enforce local camping
ordinances.
 Cities can now more confidently
expand/enforce regulations on camping in
public areas without this threat of
constitutional challenge under the
aforementioned 9th Circuit cases

Page 584 of 1852 ends

Proposed Ordinance
 Proposed ordinance repeals the pertinent language
in HBMC sections 12.20240 and 12.28.010 and
instead creates a single Chapter – Chapter 12.40 in
the HBMC
 As proposed, Chatper12.40 does the following:
 Prohibit “camping” (as defined) citywide in “prohibited public places” (also defined)
 Prohibit using a vehicle for human habitation in prohibited public places
 Can not start or use a fire in prohibited public places, prohibits the storage of personal property that obstructs public access or within 20 feet of any entrance or exit to a business or building.  Subject to administrative citation process.

Page 585 of 1852 ends

Proposed Ordinance
 “Camping” means to use property for living
accommodation purposes or to use a vehicle
for human habitation.
 “Prohibited public place” means any public
property that is not designated for camping
by formal action of the City Council, the
written consent of the City Manager, the
provisions of this Code, or a validly issued City
permit authorizing such activity or other
governmental entity having jurisdiction over
the property.

Page 586 of 1852 ends

Not a Panacea
 This ordinance is meant to be one tool in the
City’s toolkit.
 City will continue to take a “care first”
approach as formal citation processes likely
not enough to get any long-term results and
the City is not trying to just move the problem
along to another jurisdiction
 However, hope is that this may spur some % of
the at-issue population to avail themselves to
services

Page 587 of 1852 ends

Recommendations
 Staff recommends City Council: 1. Introduce by title only and waive first reading of an Ordinance of the City of
Hermosa Beach, California, (Attachment 1) repealing
Hermosa Beach Municipal Code (“HBMC”) sections

12.28.010 and 12.20.240 and adding Chapter 12.40 to the HBMC regulating camping in public areas and finding the ordinance is exempt from the California Environmental
Quality Act (“CEQA”)
 Direct the City Clerk to publish a summary ordinance.

Page 588 of 1852 ends

City of Hermosa Beach | Page 1 of 7
Meeting Date: February 25, 2025
Staff Report No. 25-PW-008
Honorable Mayor and Members of the Hermosa Beach City Council AWARD OF CONSTRUCTION CONTRACT FOR CIP 105–ANNUAL STREET IMPROVEMENTS AND CIP 695–PARKING LOT A IMPROVEMENTS AND

APPROPRIATION OF RUBBERIZED PAVEMENT GRANT FUNDS FROM

CALRECYCLE FOR PROJECT REIMBURSEMENT
CEQA: Determine the CIP 105–Annual Street Improvements and CIP 695–Parking Lot A Improvements project is exempt from the California Environmental Quality Act pursuant to CEQA Guidelines Section 15301 (Existing Facilities). The proposed work is surface improvements of an existing public roadway.
(Public Works Director Joe SanClemente)
Recommended Action:

Staff recommends City Council:

1. Award a construction contract for CIP 105–Annual Street Improvements and CIP 695–Parking Lot A Improvements to Hardy & Harper, Inc. in the amount of $3,200,000 (Attachment 1);

2. Authorize the Director of Public Works to establish a construction cost contingency in the amount of $500,000 and approve contract change orders up to the amount of the approved construction cost;

3. Adopt the attached resolution entitled "A Resolution of The City Council of the City of Hermosa Beach Approving the Construction of CIP 105–Annual Street Improvements and CIP 695–Parking Lot A Improvements Pursuant to Government Code Section 830.6 and Establishing a Project Payment Account” (Attachment 2);

4. Authorize the Mayor to execute the construction contract and the City Clerk to attest, subject to approval by the City Attorney;

5. Accept $50,000 in grant funds from CalRecycle for CIP 105 project reimbursement;

6. Appropriate $50,000 and add estimated revenue of $50,000 in the Grants Fund for the Rubberized Pavement Grant Program;

7. Release $50,000 of CIP 105 project budget back to the Capital Improvement Fund due to Cal Recycle grant funding source; and

8. Authorize the Director of Public Works to file a Notice of Completion following final completion of the project.

Executive Summary:

Page 589 of 1852 ends

City of Hermosa Beach | Page 2 of 7
Capital Improvement Program (CIP) Projects CIP 105–Annual Street Improvements and CIP 695–Parking Lot A provide pavement rehabilitation of various streets and Parking Lot A. The scope of work includes pavement rehabilitation, reconstruction of damaged concrete improvements, and re-striping along approximately two miles of roadways including Pier Avenue from Hermosa Avenue to Pacific Coast Highway, Valley Drive from Pier Avenue to Herondo Street, and segments of various residential streets (Attachment 3). Parking Lot A improvements include pavement rehabilitation, reconstruction of damaged concrete gutters, repainting parking stall lines, and replacement of waste enclosures fencing.

The project also provides enhanced bicycle markings and removal and replacement of deteriorated portions of sidewalk, curb and gutter, and curb ramps to meet the Americans with Disabilities Act (ADA) requirements at various locations as shown on the project plans (Attachment 6) and contract documents (Attachment 7). Staff recommends City Council award a construction contract in the amount of $3,200,000 to the lowest responsive and responsible bidder, Hardy & Harper, Inc.

Background:

The Fiscal Year 2024–2025 Capital Improvement Program includes CIP 105–Annual Street Improvements and CIP 695–Parking Lot A Improvements, which were planned to be combined and bid as one construction project for efficiency in project delivery.

The streets for this project were selected based on their Pavement Condition Index (PCI) and staff’s review of public requests and current pavement conditions. The project includes pavement rehabilitation in Parking Lot A and approximately two miles of roadway including the full length of Pier Avenue from Hermosa Avenue to Pacific Coast Highway, Valley Drive from Pier Avenue to Herondo Street, and segments of various residential streets.

The scope of work includes, but is not limited to, milling existing pavement; full-depth pavement repairs; paving; pavement striping and markings; traffic signal loops detection replacement; utility cover adjustments; removal and replacement of existing sidewalk, curb, and gutter; upgrade of curb ramps to meet the Americans with Disabilities Act (ADA) standards at various locations; and restoration of survey monuments. The project also includes enhancement bicycle markings, including the installation of limited green bicycle markings on Pier Avenue to enhance visibility; installation of a new bicycle lane along Pier Avenue eastbound from Ardmore Avenue to Pacific Coast Highway; and the addition of green backed sharrow pavement markings along Valley Drive between Pier Avenue and Herondo Street.

Analysis:

Page 590 of 1852 ends

City of Hermosa Beach | Page 3 of 7
On December 12, 2024, the City issued Notice Inviting Bids 24-010 inviting experienced contractors to submit a bid for the subject project. The Notice Inviting Bids was published in the local newspaper, on the City’s electronic bidding platform, Planet Bids, and in relevant construction trade journals. On January 15, 2025, the City received a total of seven bids, which were opened and read aloud by the City Clerk. The bid results are provided in Attachment 4 and summarized below.

BIDDER BID AMOUNT
Hardy & Harper, Inc. $3,200,000
Sully-Miller Contracting Company $3,220,975
PALP dba Excel Paving Company $3,498,600
Sequel Contractors, Inc. $3,573,417
Onyx Paving Company, Inc. $3,693,000
Toro Enterprises, Inc. $3,727,960
All American Asphalt $3,759,295
Staff reviewed the bid documents submitted by the lowest bidder, Hardy & Harper, Inc. (Attachment 5) and determined it to be the lowest responsible and responsive bidder.

Hardy & Harper, Inc.’s total bid amount is approximately three percent lower than the Engineer’s Estimate of $3,300,000.

Staff confirmed Hardy & Harper, Inc. contractor license is active and in good standing with the California Contractor’s State License Board. Staff contacted references and confirmed competency through completion of recent projects with similar scope of work within the past five years. Hardy & Harper, Inc. satisfactorily performed prior work in the City of Hermosa Beach, including the recent Prospect Avenue resurfacing completed as part of CIP 191. Staff finds Hardy & Harper, Inc. to be a qualified contractor to complete the proposed work for the project.

If awarded, staff would provide construction management with additional support provided by one of the City’s on-call public works inspectors that specializes in paving, and concrete improvements. Staff anticipates construction to start as soon as April 2025 and to be completed by Summer 2025. The City’s engineering team added specifications in the contract documents to prioritize the completion of construction on Pier Avenue and in Lot A and would make every effort to minimize disruptions in advance of the busy Spring and Summer months.

Staff is cognizant that there would be significant impacts to businesses, traffic flow, and parking in the project areas during this time and would issue project communications through a variety of methods to raise awareness and minimize impacts. Notifications of construction would be issued on social media and through the distribution of construction notices to directly impacted residents and businesses prior to the beginning of

Page 591 of 1852 ends

City of Hermosa Beach | Page 4 of 7
construction. The notices would alert stakeholders of construction dates, expected type of work, possible vehicular and pedestrian traffic impacts, and phone numbers of key personnel involved with the construction of the project. Staff also made individual contact, and would continue to closely communicate, with individual businesses with on-street dining decks. To facilitate the pavement project, the decks would need to be removed and replaced at the owner’s cost. Project updates would also be posted on the City’s website on a regular basis until completion.

Staff recommends City Council award a construction contract for CIP 105–Annual Street Improvements and CIP 695–Parking Lot A Improvements in the amount of $3,200,000 to the lowest responsive and responsible bidder, Hardy & Harper, Inc.

Environmental Analysis
The Project is exempt under the California Environmental Quality Act (CEQA) pursuant to CEQA Guidelines Section 15301 (Existing Facilities). The proposed work is surface improvements of an existing public roadway. No exceptions to the CEQA exemption apply.

General Plan Consistency:

This report and associated recommendation have been evaluated for their consistency with the City’s General Plan. Relevant Policies are listed below:

Mobility Element
Goal 1. Complete Streets (Living Streets) that serve the diverse functions of mobility, commerce, recreation, and community engagement for all users whether they travel by walking, bicycling, transit, or driving.

Policy:
 1.1 Consider all modes. Require the planning, design, and construction of all new and existing transportation projects to consider the needs of all modes of travel to create safe, livable, and inviting environments for all users of the system.

Goal 2. A public realm that is safe, comfortable, and convenient for travel via foot, bicycle, public transit, and automobile and creates vibrant, people oriented public spaces that encourage active living.

Policy:
 2.1 Prioritize public rights-of-ways. Prioritize improvements of public rights-ofways that provide heightened levels of safe, comfortable, and attractive public spaces for all non-motorized travelers while balancing the needs of efficient vehicular circulation.

Goal 3. Public rights-of-ways supporting a multimodal and people-oriented transportation system that provides diversity and flexibility on how users choose to be mobile.

Page 592 of 1852 ends

City of Hermosa Beach | Page 5 of 7
Policies:
 3.1 Enhance public rights-of-way. Where right-of-way clearance allows, enhance public right -of-way to improve connectivity for pedestrians, bicyclists, disabled persons, and public transit stops.
 3.2 Complete pedestrian network. Prioritize investment in designated priority sidewalks to ensure a complete network of sidewalks and pedestrian-friendly amenities that enhances pedestrian safety, access opportunities and connectivity to destinations.
 3.10 Require ADA standards. Require that all public rights-of-way be designed per Americans with Disabilities Act (ADA) standards by incorporating crosswalks, curb ramps, pedestrian signals, and other components to provide ease of access for disabled persons.

Goal 7. A transportation system that results in zero transportation-related fatalities and which minimizes injuries.

Policy:
 7.1 Safe public rights-of-ways. Encourage that all public rights-of-ways are safe for all users at all times of day where users of all ages and ability feel comfortable participating in both motorized and non-motorized travel.

Infrastructure Element
Goal 1. Infrastructure systems are functional, safe, and well maintained.

Policy:
 1.1 Infrastructure systems plan. Establish and adopt an integrated, holistic systems approach to guide infrastructure development, improvement, maintenance, and resilience.

Goal 2. Roadway infrastructure maintenance supports convenient, attractive, and complete streets and associated amenities.

Policy:
 2.4 Sidewalk Improvements. Consider innovative funding strategies, such as cost-sharing ADA accessibility grants, or sidewalk dedications, to improve the overall condition, safety, and accessibility of sidewalks.

Fiscal Impact:

CIP 105–Annual Street Improvements and CIP 695–Parking Lot A Improvements were included in the FY 2024–2025 Adopted Budget. Sufficient funds are available to cover construction costs of the project based on the $3,200,000 bid amount and $500,000 in construction cost contingency for a total construction budget not to exceed $3,700,000.

Page 593 of 1852 ends

City of Hermosa Beach | Page 6 of 7
The design for this project was prepared by staff saving the City approximately $500,000 in design fees. The remaining funding was instead utilized to augment the project’s budget and complete repaving of additional street segments.

In January 2025, the City applied for and successfully secured a $50,000 reimbursable grant from CalRecycle’s Rubberized Pavement Grant Program (Attachment 8).

CalRecycle would reimburse the City after completion of the project and upon submission of proof of use of Rubberized Asphalt.

Staff would appropriate $50,000 and add the corresponding estimated revenue of $50,000 in the Grants Fund for the CalRecycle Rubberized Pavement Grant. Staff would also release $50,000 of CIP 105 project budget back to the Capital Improvement Fund fund balance for other and future CIP projects.

The available funds for the project are shown below:

Project Funding
Description Request
Amount
FY 2024-2025 Budget
Dept. Account #
Available
Amount
Hardy & Harper, Inc. $3,200,000
115-8105-4201
146-8105-4201
147-8105-4201
148-8105-4201
122-8105-4201
301-8105-4201
190-8695-4201
$3,200,000
Contingency $500,000 $500,000
CalRecycle Rubberized
Pavement Grant
$50,000
$(50,000)
150-8105-4201
301-8105-4201
$50,000
$(50,000)
Total $3,700,000 $3,700,000
Attachments:

1. Draft Contract

2. Draft Resolution

3. Project Location Map

4. Bid Opening Log

5. Hardy & Harper Inc.’s Bid Documents

6. Project Plans

7. Contract Documents and Special Provisions

8. CalRecycle Grant Agreement Cover Sheet
Respectfully Submitted by: Briana Aube, Assistant Engineer Concur: Heecheol Kwon, Senior Engineer
Concur: Joe SanClemente, Public Works Director
Noted for Fiscal Impact: Brandon Walker, Administrative Services Director

Page 594 of 1852 ends

City of Hermosa Beach | Page 7 of 7
Legal Review: Patrick Donegan, City Attorney
Reviewed by: Angela Crespi, Deputy City Manager
Approved: Suja Lowenthal, City Manager

Page 595 of 1852 ends

1 A. CONTRACT AGREEMENT
This Construction Agreement (“Agreement”) is made and entered into as of the date executed by the Mayor and attested to by the City Clerk, by and between Hardy & Harper, Inc. (hereinafter referred to as "CONTRACTOR") and the City of Hermosa Beach, California, a municipal corporation (hereinafter referred to as "CITY").

R E C I T A L S
A. Pursuant to the Notice Inviting Sealed Bids for CIP NO. 105 ANNUAL STREET IMPROVEMENTS AND CIP NO. 695 PARKING LOT A IMPROVEMENTS (“Project”), bids were received, publicly opened, and declared on the date specified in the notice; and B. On February 25, 2025, City’s City Council declared CONTRACTOR to be the lowest responsible Bidder and accepted the bid of CONTRACTOR; and
C. The City Council has authorized the Mayor to execute a written Contract with CONTRACTOR for furnishing labor, equipment, and material for the CIP NO. 105 ANNUAL STREET IMPROVEMENTS AND CIP NO. 695 PARKING LOT A IMPROVEMENTS in the City of Hermosa Beach.

NOW, THEREFORE, in consideration of the foregoing and the mutual covenants herein contained, it is agreed:

1. GENERAL SCOPE OF WORK: CITY agrees to engage CONTRACTOR and CONTRACTOR agrees to furnish all necessary labor, tools, materials, appliances, and equipment for and do the work for the CIP NO. 105 ANNUAL STREET IMPROVEMENTS and CIP NO. 695 PARKING LOT A IMPROVEMENTS in the City of Hermosa Beach. The work shall be performed in accordance with the Plans and Specifications dated December 2024, (the “Specifications”) on file in the office of the City Clerk and in accordance with bid prices set forth in CONTRACTOR’S Bid Proposal and in accordance with the instructions of the City Engineer.

2. INCORPORATED DOCUMENTS TO BE CONSIDERED COMPLEMENTARY: The Contract documents for the aforesaid project shall consist of the Notice Inviting Bids, Instructions to Bidders, Bid Proposal, Builders General Provisions, Standard Specifications for Public Works Construction 2024 edition, Special Provisions, Exhibit A, Exhibit B, Exhibit C, Exhibit D, and all referenced specifications, details, standard drawings, and appendices; together with this Agreement and all required bonds, insurance certificates, permits, notices and affidavits; and also, including any and all addenda or supplemental agreements clarifying, amending, or extending the work contemplated as may be required to insure its completion in an acceptable manner. All of the provisions of said Contract documents are made a part hereof as though fully set forth herein.

This Contract is intended to require a complete and finished piece of work and anything necessary to complete the work properly and in accordance with the law and lawful governmental regulations shall be performed by CONTRACTOR whether set out specifically in the Contract or not. Should it be ascertained that any inconsistency exists between the aforesaid documents and this written agreement, the provisions of this Agreement, the Builders General Provisions and the Standard Specifications, in that order, shall control. Collectively, these Contract documents constitute the

Page 596 of 1852 ends

2 complete agreement between CITY and CONTRACTOR and supersede any previous agreements or understandings.

3. COMPENSATION: CONTRACTOR agrees to receive and accept the prices set forth in its Bid Proposal $3,200,000 as full compensation for furnishing all materials, performing all work, and fulfilling all obligations hereunder. Said compensation shall cover all expenses, losses, damages, and consequences arising out of the nature of the work during its progress or prior to its acceptance including those for well and faithfully completing the work and the whole thereof in the manner and time specified in the aforesaid Contract documents; and also including those arising from actions of the elements, unforeseen difficulties or obstructions encountered in the prosecution of the work, suspension or discontinuance of the work, and all other unknowns or risks of any description connected with the work.

4. TIME OF PERFORMANCE: CONTRACTOR agrees to complete the work within 75 working days from the date of the notice to proceed. By signing this Agreement, CONTRACTOR represents to CITY that the Contract time is reasonable for completion of the work and that CONTRACTOR will complete such work within the Contract time.

5. LIQUIDATED DAMAGES: In accordance with Government Code section 53069.85, it is agreed that CONTRACTOR will pay to CITY the sum set forth in the Special Provisions for each and every calendar day of delay beyond the time prescribed in the Contract Documents for finishing the Work, as Liquidated Damages and not as a penalty or forfeiture. In the event this is not paid, CONTRACTOR agrees CITY may deduct that amount from any money due or that may become due CONTRACTOR under the Contract. This Article does not exclude recovery of other damages specified in the Contract Documents.

6. SUBSTITUTION OF SECURITIES: Pursuant to section 22300 of the Public Contract Code of the State of California, CONTRACTOR may request CITY to make retention payments directly to an escrow agent or may substitute securities for any money withheld by CITY to ensure performance under the Contract. At the request and expense of CONTRACTOR, securities equivalent to the amount withheld shall be deposited with CITY or with a state or federally chartered bank as the escrow agent who shall return such securities to CONTRACTOR upon satisfactory completion of the Contract. Deposit of securities with an escrow agent shall be subject to a written agreement substantially in the form provided in section 22300 of the Public Contract Code.

7. PREVAILING WAGES AND CALIFORNIA LABOR LAWS.

Pursuant to Labor Code §§ 1720 et seq., and as specified in 8 California Code of Regulations § 16000 (“Prevailing Wage Laws”), CONTRACTOR must pay its workers prevailing wages. It is CONTRACTOR’s responsibility to interpret and implement any prevailing wage requirements, and CONTRACTOR agrees to pay any penalty or civil damages resulting from a violation of the prevailing wage laws. CONTRACTOR shall defend, indemnify and hold the CITY, its officials, officers, employees and agents free and harmless from any claim or liability arising out of any failure or alleged failure to comply with the Prevailing Wage Laws. CONTRACTOR and any

Page 597 of 1852 ends

3 subcontractor shall forfeit a penalty of up to $200 per calendar day or portion thereof for each worker paid less than the prevailing wage rates.

In accordance with Labor Code § 1773.2, copies of the prevailing rate of per diem wages are available upon request from CITY’s Engineering Division or the website for State of California Prevailing wage determination at http://www.dir.ca.gov/DLSR/PWD. CONTRACTOR must post a copy of the prevailing rate of per diem wages at the job site.

CITY directs CONTRACTOR’s attention to Labor Code §§ 1777.5, 1777.6 and 3098 concerning the employment of apprentices by CONTRACTOR or any subcontractor.

Labor Code § 1777.5 requires CONTRACTOR or subcontractor employing tradesmen in any apprenticeship occupation to apply to the joint apprenticeship committee nearest the site of the public works project and which administers the apprenticeship program in that trade for a certificate of approval. The certificate must also fix the ratio of apprentices to journeymen that will be used in the performance of the Contract. The ratio of apprentices to journeymen in such cases will not be less than one to five except:

When CONTRACTOR provides evidence that CONTRACTOR employs registered apprentices on all of his Contracts on an annual average of not less than one apprentice to five journeymen.

When unemployment in the area of coverage by the joint apprenticeship committee has exceeded an average of 15 percent in the 90 days before the request for certificate, or When the number of apprentices in training in the area exceeds a ratio of one to five, or When the trade can show that it is replacing at least 1/30 of its membership through apprenticeship training on an annual basis state-wide or locally, or
Assignment of an apprentice to any work performed under a public works Contract would create a condition that would jeopardize his or her life or the life, safety, or property of fellow employees or the public at large, or the specific task to which the apprentice is to be assigned is of a nature that training cannot be provided by a journeyman.

CONTRACTOR is required to make contributions to funds established for the administration of apprenticeship programs if CONTRACTOR employs registered apprentices or journeymen in any apprenticeable trade on such Contracts and if other Contractors on the public works site are making such contributions.

CONTRACTOR and any subcontractor must comply with Labor Code §§ 1777.5 and 1777.6 in the employment of apprentices.

Information relative to apprenticeship standards, wage schedules and other requirements may be obtained from the Director of Industrial Relations, ex-officio the Administrator of Apprenticeship, San Francisco, California, or from the Division of Apprenticeship Standards and its branch offices.

Page 598 of 1852 ends

4 The CONTRACTOR or any subcontractor that is determined by the Labor Commissioner to have knowingly violated Section 1777.5 shall forfeit as a civil penalty an amount not exceeding $100 for each full calendar day of noncompliance, or such greater amount as provided by law.

CONTRACTOR and each subcontractor shall keep an accurate payroll record, showing the name, address, social security number, work classification, straight time and overtime hours worked each day and week, and the actual per diem wages paid to each journeyman, apprentice, worker, or other employee employed by him or her in connection with the public work. The payroll records shall be certified and shall be available for inspection at all reasonable hours at the principal office of CONTRACTOR in the manner provided in Labor Code section 1776. In the event of noncompliance with the requirements of this section, CONTRACTOR shall have 10 days in which to comply subsequent to receipt of written notice specifying in what respects such CONTRACTOR must comply with this section. Should noncompliance still be evident after such 10-day period, CONTRACTOR shall, as a penalty to CITY, forfeit not more than $100.00 for each calendar day or portion thereof, for each worker, until strict compliance is effectuated. The amount of the forfeiture is to be determined by the Labor Commissioner. A Contractor who is found to have violated the provisions of law regarding wages on Public Works with the intent to defraud shall be ineligible to bid on Public Works Contracts for a period of one to three years as determined by the Labor Commissioner. Upon the request of the Division of Apprenticeship Standards or the Division of Labor Standards Enforcement, such penalties shall be withheld from progress payments then due. The responsibility for compliance with this section is on CONTRACTOR.

The requirement to submit certified payroll records directly to the Labor Commissioner under Labor Code section 1771.4 shall not apply to work performed on a public works project that is exempt pursuant to the small project exemption specified in Labor Code Section 1771.4.

Any ineligible Contractor or subcontractor pursuant to Labor Code Sections 1777.1 and 1777.7 may not perform work on this Project.

By executing this Contract, CONTRACTOR verifies that it fully complies with all requirements and restrictions of state and federal law respecting the employment of undocumented aliens, including, but not limited to, the Immigration Reform and Control Act of 1986, as may be amended from time to time, and shall require all subcontractors and sub-subcontractors to comply with the same.

8. LEGAL HOURS OF WORK: Eight (8) hours of labor shall constitute a legal day's work for all workmen employed in the execution of this Contract, and CONTRACTOR and any subcontractor under it shall comply with and be governed by the laws of the State of California having to do with working hours set forth in Division 2, Part 7, Chapter 1, Article 3 of the Labor Code of the State of California as amended.

CONTRACTOR shall forfeit, as a penalty to City, twenty-five dollars ($25.00) for each laborer, workman or mechanic employed in the execution of the Contract, by him or any subcontractor under it, upon any of the work hereinbefore mentioned, for each calendar day during which the laborer, worker or mechanic is required or permitted to labor more than eight (8) hours in any one calendar day or 40 hours in any one calendar week in violation of the Labor Code.

Page 599 of 1852 ends

5 9. PUBLIC WORKS CONTRACTOR REGISTRATION: Pursuant to Labor Code sections 1725.5 and 1771.1, all Contractors and subcontractors that wish to bid on, be listed in a bid proposal, or enter into a Contract to perform public work must be registered with the Department of Industrial Relations (DIR). No bid will be accepted nor any Contract entered into without proof of the Contractor’s and subcontractors’ current registration with the DIR to perform public work.

Notwithstanding the foregoing, the Contractor registration requirements mandated by Labor Code Sections 1725.5 and 1771.1 shall not apply to work performed on a public works project that is exempt pursuant to the small project exemption specified in Labor Code Sections 1725.5 and 1771.1.

10. LABOR COMPLIANCE AND STOP ORDERS: This Project is subject to compliance monitoring and enforcement by the DIR. It shall be CONTRACTOR’s sole responsibility to evaluate and pay the cost of complying with all labor compliance requirements under this Contract and applicable law. Any stop orders issued by the DIR against CONTRACTOR or any subcontractor that affect CONTRACTOR’s performance of Work, including any delay, shall be CONTRACTOR’s sole responsibility. Any delay arising out of or resulting from such stop orders shall be considered CONTRACTOR caused delay subject to any applicable liquidated damages and shall not be compensable by the CITY. CONTRACTOR shall defend, indemnify and hold CITY, its officials, officers, employees and agents free and harmless from any claim or liability arising out of stop orders issued by the DIR against CONTRACTOR or any subcontractor.

11. DEBARMENT OF CONTRACTORS AND SUBCONTRACTORS: Contractors or subcontractors may not perform work on a public works project with a subcontractor who is ineligible to perform work on a public project pursuant to Labor Code section 1777.1 or 1777.7.

Any Contract on a public works project entered into between a Contractor and a debarred subcontractor is void as a matter of law. A debarred subcontractor may not receive any public money for performing work as a subcontractor on a public works Contract. Any public money that is paid, or may have been paid to a debarred subcontractor by a Contractor on the Project shall be returned to the CITY. CONTRACTOR shall be responsible for the payment of wages to workers of a debarred subcontractor who has been allowed to work on the project.

12. LABOR/EMPLOYMENT SAFETY: CONTRACTOR shall comply with all applicable laws and regulations of the federal, state, and local government, including Cal/OSHA requirements and requirements for verification of employees’ legal right to work in the United States CONTRACTOR shall maintain emergency first aid treatment for its employees which complies with the Federal Occupational Safety and Health Act of 1970 (29 U.S.C. § 651 et seq.), and California Code of Regulations, Title 8, Industrial Relations Division 1, Department of Industrial Relations, Chapter 4. CONTRACTOR shall ensure the availability of emergency medical services for its employees in accordance with California Code of Regulations, Title 8, Section 1512.

CONTRACTOR shall submit the Illness and Injury Prevention Program and a Project site specific safety program to CITY prior to beginning Work at the Project site. CONTRACTOR shall maintain a confined space program that meets or exceeds the CITY Standards. CONTRACTOR shall adhere to CITY’s lock out tag out program

Page 600 of 1852 ends

6 13. TRAVEL AND SUBSISTENCE PAY: CONTRACTOR agrees to pay travel and subsistence pay to each worker needed to execute the work required by this Agreement as such travel and subsistence payments are defined in the applicable collective bargaining agreements filed in accordance with Labor Code Section 1773.8.

14. CONTRACTOR'S LIABILITY: The City of Hermosa Beach and its officers, agents and employees ("Indemnitees") shall not be answerable or accountable in any manner for any loss or damage that may happen to the work or any part thereof, or for any of the materials or other things used or employed in performing the work; or for injury or damage to any person or persons, either workers or employees of CONTRACTOR, of its subcontractors or the public, or for damage to adjoining or other property from any cause whatsoever arising out of or in connection with the performance of the work. CONTRACTOR shall be responsible for any damage or injury to any person or property resulting from defects or obstructions or from any cause whatsoever.

To the fullest extent permitted by law, CONTRACTOR will indemnify Indemnities against and will hold and save Indemnitees harmless from any and all actions, claims, damages to persons or property, penalties, obligations or liabilities that may be asserted or claimed by any person, firm, entity, corporation, political subdivision, or other organization arising out of or in connection with the work, operation, or activities of CONTRACTOR, its agents, employees, subcontractors or invitees provided for herein, whether or not there is concurrent passive negligence on the part of City. In connection therewith:
a. CONTRACTOR will defend any action or actions filed in connection with any such claims, damages, penalties, obligations or liabilities and will pay all costs and expenses, including attorneys' fees, expert fees and costs incurred in connection therewith. b. CONTRACTOR will promptly pay any judgment rendered against CONTRACTOR or Indemnitees covering such claims, damages, penalties, obligations and liabilities arising out of or in connection with such work, operations or activities of CONTRACTOR hereunder, and CONTRACTOR agrees to save and hold the Indemnitees harmless therefrom.
c. In the event Indemnitees are made a party to any action or proceeding filed or prosecuted against CONTRACTOR for damages or other claims arising out of or in connection with the work, operation or activities hereunder, CONTRACTOR agrees to pay to Indemnitees and any all costs and expenses incurred by Indemnitees in such action or proceeding together with reasonable attorneys' fees.

Contractor's obligations under this section apply regardless of whether or not such claim, charge, damage, demand, action, proceeding, loss, stop notice, cost, expense, judgment, civil fine or penalty, or liability was caused in part or contributed to by an Indemnitee. However, without affecting the rights of City under any provision of this agreement, to the extent required by Civil Code section 2782, Contractor shall not be required to indemnify and hold harmless City for liability attributable to the active negligence of City, provided such active negligence is determined by agreement between the parties or by the findings of a court of competent jurisdiction. In

Page 601 of 1852 ends

7 instances where City is shown to have been actively negligent and where City active negligence accounts for only a percentage of the liability involved, the obligation of Contractor will be for that entire portion or percentage of liability not attributable to the active negligence of City.

So much of the money due to CONTRACTOR under and by virtue of the Contract as shall be considered necessary by City may be retained by City until disposition has been made of such actions or claims for damages as aforesaid.

It is expressly understood and agreed that the foregoing provisions are intended to be as broad and inclusive as is permitted by the law of the State of California. This indemnity provision shall survive the termination of the Agreement and is in addition to any other rights or remedies which Indemnitees may have under the law.

This indemnity is effective without reference to the existence or applicability of any insurance coverage which may have been required under this Agreement or any additional insured endorsements which may extend to Indemnitees.

CONTRACTOR, on behalf of itself and all parties claiming under or through it, hereby waives all rights of subrogation and contribution against the Indemnitees, while acting within the scope of their duties, from all claims, losses and liabilities arising out of or incident to activities or operations performed by or on behalf of the CONTRACTOR regardless of any prior, concurrent, or subsequent passive negligence by the Indemnitees.

15. THIRD PARTY CLAIMS. In accordance with Public Contract Code § 9201, CITY will promptly inform CONTRACTOR regarding third-party claims against CONTRACTOR, but in no event later than (14) calendar days after CITY receives such claims. Such notification will be in writing and forwarded in accordance with the “Notice” section of this Agreement. As more specifically detailed in the Contract documents, CONTRACTOR agrees to indemnify and defend the City against any third-party claim.

16. WORKERS COMPENSATION: In accordance with California Labor Code Sections 1860 and 3700, CONTRACTOR and each of its subcontractors will be required to secure the payment of compensation to its employees. In accordance with the provisions of California Labor Code Section 1861, CONTRACTOR, by signing this Contract, certifies as follows: "I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for worker's compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this Contract.

17. INSURANCE: CONTRACTOR shall procure and maintain for the duration of the Agreement, and for 1 year thereafter, insurance against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the work hereunder by the CONTRACTOR, its agents, representatives, employees, or subcontractors. a. Minimum Scope and Limit of Insurance. Coverage shall be at least as broad as:

Page 602 of 1852 ends

8 i. Commercial General Liability (CGL): Insurance Services Office (ISO) Form CG 00 01 covering CGL on an “occurrence” basis, including products and completed operations, property damage, bodily injury and personal & advertising injury with limits no less than $5,000,000 per occurrence.

If a general aggregate limit applies, either the general aggregate limit shall apply separately to this project/location (ISO CG 25 03 or 25 04) or the general aggregate limit shall be twice the required occurrence limit.
ii. Automobile Liability: Insurance Services Office Form CA 0001 covering Code 1 (any auto), with limits no less than $5,000,000 per accident for bodily injury and property damage. iii. Workers’ Compensation insurance as required by the State of California, with Statutory Limits, and Employers’ Liability insurance with a limit of no less than $1,000,000 per accident for bodily injury or disease.
iv. Builder’s Risk (Course of Construction) insurance utilizing an “All Risk” (Special Perils) coverage form, with limits equal to the completed value of the project and no coinsurance penalty provisions. v. Professional Liability (if Design/Build), with limits no less than $2,000,000 per occurrence or claim, and $2,000,000 policy aggregate.
vi. Contractors’ Pollution Legal Liability and/or Asbestos Legal Liability and/or Errors and Omissions (if project involves environmental hazards) with limits no less than $1,000,000 per occurrence or claim, and $2,000,000 policy aggregate.
vii. If the Contractor maintains broader coverage and/or higher limits than the minimums shown above, the CITY requires and shall be entitled to the broader coverage and/or the higher limits maintained by CONTRACTOR. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to the CITY. b. Self-Insured Retentions. Self-insured retentions must be declared to and approved by the CITY.

At the option of the CITY, either: the CONTRACTOR shall obtain coverage to reduce or eliminate such self-insured retentions as respects the CITY, its officers, officials, employees, and volunteers; or the CONTRACTOR shall provide a financial guarantee satisfactory to the CITY guaranteeing payment of losses and related investigations, claim administration, and defense expenses. The policy language shall provide, or be endorsed to provide, that the self-insured retention may be satisfied by either the named insured or CITY.
c. Other Insurance Provisions. The insurance policies are to contain, or be endorsed to contain, the following provisions:
i. The CITY, its officers, officials, employees, and volunteers are to be covered as additional insureds on the CGL policy with respect to liability arising out of work or operations performed by or on behalf of the CONTRACTOR including materials, parts, or equipment furnished in connection with such work or operations and automobiles owned, leased, hired, or borrowed by or on behalf of the CONTRACTOR. General liability coverage can be provided in the form of an endorsement to the CONTRACTOR’s insurance (at least as broad as ISO Form CG 20 10, CG 11 85 or both CG 20 10, CG 20 26, CG 20 33, or CG 20 38; and CG 20 37 forms if later revisions used).

Page 603 of 1852 ends

9 ii. For any claims related to this project, the CONTRACTOR’s insurance coverage shall be primary insurance coverage at least as broad as ISO CG 20 01 04 13 as respects the CITY, its officers, officials, employees, and volunteers. Any insurance or self-insurance maintained by the CITY, its officers, officials, employees, or volunteers shall be excess of the CONTRACTOR’s insurance and shall not contribute with it.
iii. Each insurance policy required by this clause shall provide that coverage shall not be canceled, except with notice to the CITY.
d. Builder’s Risk (Course of Construction) Insurance.
i. CONTRACTOR may submit evidence of Builder’s Risk insurance in the form of Course of Construction coverage. Such coverage shall name the CITY as a loss payee as their interest may appear.
ii. If the Project does not involve new or major reconstruction, at the option of the CITY, an Installation Floater may be acceptable. For such projects, a Property Installation Floater shall be obtained that provides for the improvement, remodel, modification, alteration, conversion or adjustment to existing buildings, structures, processes, machinery, and equipment. The Property Installation Floater shall provide property damage coverage for any building, structure, machinery or equipment damaged, impaired, broken, or destroyed during the performance of the Work, including during transit, installation, and testing at the CITY’s site. e. Claims Made Policies. If any coverage required is written on a claims-made coverage form:
i. The retroactive date must be shown, and this date must be before the execution date of the Contract or the beginning of Contract work.
ii. Insurance must be maintained and evidence of insurance must be provided for at least five (5) years after completion of Contract work.
iii. If coverage is cancelled or non-renewed, and not replaced with another claims-made policy form with a retroactive date prior to the Contract effective, or start of work date, the CONTRACTOR must purchase extended reporting period coverage for a minimum of five (5) years after completion of Contract work.
iv. A copy of the claims reporting requirements must be submitted to the CITY for review. v. If the services involve lead-based paint or asbestos identification/remediation, the Contractors Pollution Liability policy shall not contain lead-based paint or asbestos exclusions. If the services involve mold identification/remediation, the Contractors Pollution Liability policy shall not contain a mold exclusion, and the definition of Pollution shall include microbial matter, including mold.
f. Acceptability of Insurers. Insurance is to be placed with insurers authorized to conduct business in the state with a current A.M. Best rating of no less than A: VII, unless otherwise acceptable to the CITY.

Page 604 of 1852 ends

10 g. Waiver of Subrogation. CONTRACTOR hereby agrees to waive rights of subrogation which any insurer of CONTRACTOR may acquire from CONTRACTOR by virtue of the payment of any loss. CONTRACTOR agrees to obtain any endorsement that may be necessary to affect this waiver of subrogation. The Workers’ Compensation policy shall be endorsed with a waiver of subrogation in favor of the CITY for all work performed by the CONTRACTOR, its employees, agents and subcontractors.
h. Verification of Coverage. CONTRACTOR shall furnish the CITY with original Certificates of Insurance including all required amendatory endorsements (or copies of the applicable policy language effecting coverage required by this clause) and a copy of the Declarations and Endorsement Page of the CGL policy listing all policy endorsements to CITY before work begins.

However, failure to obtain the required documents prior to the work beginning shall not waive the CONTRACTOR’s obligation to provide them. The CITY reserves the right to require complete, certified copies of all required insurance policies, including endorsements, required by these specifications, at any time.
i. Subcontractors. CONTRACTOR shall require and verify that all subcontractors maintain insurance meeting all requirements stated herein, and CONTRACTOR shall ensure that CITY is an additional insured on insurance required from subcontractors. For CGL coverage, subcontractors shall provide coverage with a form at least as broad as CG 20 38 04 13. j. Special Risks or Circumstances. CITY reserves the right to modify these requirements, including limits, based on the nature of the risk, prior experience, insurer, coverage, or other circumstances.

18. COMPLIANCE WITH CARB REGULATIONS:
a. Contractor shall comply, and shall ensure all subcontractors comply, with all applicable requirements of the most current version of the regulations imposed by California Air Resources Board (“CARB”) including, without limitation, all applicable terms of Title 13, California Code of Regulations Division 3, Chapter 9 and all pending amendments (“Regulation”). b. Throughout the Project, and for three (3) years thereafter, Contractor shall make available for inspection and copying any and all documents or information associated with Contractor’s and its subcontractors’ fleets including, without limitation, the Certificates of Reported Compliance (“CRCs”), fuel/refueling records, maintenance records, emissions records, and any other information the Contractor is required to produce, keep or maintain pursuant to the Regulation upon two (2) calendar days’ notice from the City.
c. Contractor shall be solely liable for any and all costs associated with compliance with the Regulation as well as for any and all penalties, fines, damages, or costs associated with any and all violations, or failures to comply with the Regulation. Contractor shall defend, indemnify and hold harmless the City, its officials, officers, employees and authorized volunteers free and harmless from any claims, liabilities, costs, penalties or interest arising out of any failure or alleged failure to comply with the Regulation.

19. ASSIGNMENT: This Contract is not assignable nor the performance of either party's duties delegable without the prior written consent of the other party. Any attempted or purported

Page 605 of 1852 ends

11 assignment or delegation of any of the rights of obligations of either party without the prior written consent of the other shall be void and of no force and effect.

20. INDEPENDENT CONTRACTOR: CONTRACTOR is and shall at all times remain as to the CITY, a wholly independent Contractor. Neither the CITY nor any of its agents shall have control of the conduct of CONTRACTOR or any of CONTRACTOR'S employees, except as herein set forth. CONTRACTOR shall not at any time or in any manner represent that it or any of its agents or employees are in any manner agents or employees of CITY.

21. TAXES: CONTRACTOR is responsible for paying all retail sales and use, transportation, export, import, special or other taxes and duties applicable to, and assessable against any work, materials, equipment, services, processes and operations incidental to or involved in this Contract.

CONTRACTOR is responsible for ascertaining and arranging to pay them. The prices established in the Contract shall include compensation for any taxes CONTRACTOR is required to pay by laws and regulations in effect at the bid opening date.

22. LICENSES: CONTRACTOR represents and warrants to CITY that it has all licenses, permits, qualifications, insurance, and approvals of whatsoever nature which are legally required of CONTRACTOR to practice its profession. CONTRACTOR represents and warrants to CITY that CONTRACTOR shall, at its sole cost and expense, keep in effect or obtain at all times during the term of this Agreement any licenses, permits, insurance, and approvals which are legally required of CONTRACTOR to practice its profession. CONTRACTOR shall maintain a City of Hermosa Beach business license, if required under CITY ordinance.

Contractors are required by law to be licensed and regulated by the Contractors’ State License Board which has jurisdiction to investigate complaints against Contractors if a complaint regarding a patent act or omission is filed within five (5) years of the date of the alleged violation. A complaint regarding a latent act or omission pertaining to structural defects must be filed within ten (10) years of the date of the alleged violation. Any questions concerning a Contractor may be referred to the Registrar, Contractors’ State License Board, P.O. Box 26000, Sacramento, California 95826.

23. RECORDS: CONTRACTOR shall maintain accounts and records, including personnel, property, and financial records, adequate to identify and account for all costs pertaining to this Agreement and such other records as may be deemed necessary by CITY or any authorized representative, and will be retained for four years after the expiration of this Agreement. All such records shall be made available for inspection or audit by CITY at any time during regular business hours.

24. SEVERABILITY. If any portion of these Contract documents are declared by a court of competent jurisdiction to be invalid or unenforceable, then such portion will be deemed modified to the extent necessary in the opinion of the court to render such portion enforceable and, as so modified, such portion and the balance of this Agreement will continue in full force and effect.

25. WHOLE AGREEMENT: This Agreement supersedes any and all other agreements either oral or written, between the parties and contains all of the covenants and agreements between the parties pertaining to the work of improvements described herein. Each party to this Contract acknowledges that no representations, inducements, promises or agreements, orally or otherwise,

Page 606 of 1852 ends

12 have been made by any party, or anyone acting on behalf of any party, which are not embodied herein, and that any other agreement, statements or promise not contained in this Contract shall not be valid or binding. Any modifications of this Contract will be effective only if signed by the party to be charged.

26. AUTHORITY: CONTRACTOR affirms that the signatures, titles, and seals set forth hereinafter in execution of this Agreement represent all individuals, firm members, partners, joint ventures, and/or corporate officers having a principal interest herein. Each party warrants that the individuals who have signed this Agreement have the legal power, right, and authority to make this Agreement and to bind each respective party. This Agreement may be modified by written amendment. CITY’s city manager may execute any such amendment on CITY’s behalf.

27. NOTICES: All notices permitted or required under this Agreement shall be in writing, and shall be deemed made when delivered to the applicable party’s representative as provided in this Agreement. Additionally, such notices may be given to the respective parties at the following addresses, or at such other addresses as the parties may provide in writing for this purpose. Such notices shall be deemed made when personally delivered or when mailed forty-eight (48) hours after deposit in the U.S. mail, first-class postage prepaid, and addressed to the party at its applicable address.

CITY OF HERMOSA BEACH
1315 Valley Drive
Hermosa Beach, CA 90254
Attention: ________________________ Project Manager
CONTRACTOR:
__________________________________________
__________________________________________
Attention: __________________________________

28. DISPUTES. Effective January 1, 1991, Section 20104 et seq., of the California Public Contract Code prescribes a process utilizing informal conferences, non-binding judicial supervised mediation, and judicial arbitration to resolve disputes on construction claims of $375,000 or less.

Effective January 1, 2017, Section 9204 of the Public Contract Code prescribes a process for negotiation and mediation to resolve disputes on construction claims. The intent of this Section is to implement Sections 20104 et seq. and Section 9204 of the California Public Contract Code. This Section shall be construed to be consistent with said statutes.

Claims. For purposes of this Section, “Claim” means a separate demand by CONTRACTOR, after a change order duly requested in accordance with the terms of this Contract has been denied by the CITY, for (A) a time extension, (B) payment of money or damages arising from Work done by or on behalf of CONTRACTOR pursuant to the Contract, or (C) an amount the payment of

Page 607 of 1852 ends

13 which is disputed by the CITY. A “Claim” does not include any demand for payment for which CONTRACTOR has failed to provide notice, request a change order, or otherwise failed to follow any procedures contained in the Contract Documents. Claims governed by this Section may not be filed unless and until CONTRACTOR completes all procedures for giving notice of delay or change and for the requesting of a time extension or change order, including but not necessarily limited to the change order procedures contained herein, and CONTRACTOR’s request for a change has been denied in whole or in part. Claims governed by this Section must be filed no later than fourteen (14) calendar days after a request for change has been denied in whole or in part or after any other event giving rise to the Claim. The Claim shall be submitted in writing to the CITY and shall include on its first page the following in 16 point capital font: “THIS IS A CLAIM.” Furthermore, the claim shall include the documents necessary to substantiate the claim. Nothing in this Section is intended to extend the time limit or supersede notice requirements otherwise provided by Contract for the filing of claims, including all requirements pertaining to compensation or payment for extra Work, disputed Work, and/or changed conditions. Failure to follow such Contractual requirements shall bar any claims or subsequent lawsuits for compensation or payment thereon.

Supporting Documentation. The CONTRACTOR shall submit all claims in the following format:

Summary of claim merit and price, reference Contract Document provisions pursuant to which the claim is made
List of documents relating to claim:

Specifications
Drawings
Clarifications (Requests for Information)
Schedules
Other
Chronology of events and correspondence
Analysis of claim merit
Analysis of claim cost
Time impact analysis in CPM format
If CONTRACTOR’s claim is based in whole or in part on an allegation of errors or omissions in the Drawings or Specifications for the Project, CONTRACTOR shall provide a summary of the percentage of the claim subject to design errors or omissions and shall obtain a certificate of merit in support of the claim of design errors and omissions.

Cover letter and certification of validity of the claim, including any claims from subcontractors of any tier, in accordance with Government Code section 12650 et seq.

City’s Response. Upon receipt of a claim pursuant to this Section, CITY shall conduct a reasonable review of the claim and, within a period not to exceed 45 calendar days, shall provide CONTRACTOR a written statement identifying what portion of the claim is disputed and what

Page 608 of 1852 ends

14 portion is undisputed. Any payment due on an undisputed portion of the claim will be processed and made within 60 calendar days after the public entity issues its written statement.

If CITY needs approval from its governing body to provide the CONTRACTOR a written statement identifying the disputed portion and the undisputed portion of the claim, and the governing body does not meet within the 45 calendar days or within the mutually agreed to extension of time following receipt of a claim sent by registered mail or certified mail, return receipt requested, CITY shall have up to three calendar days following the next duly publicly noticed meeting of the governing body after the 45-day period, or extension, expires to provide CONTRACTOR a written statement identifying the disputed portion and the undisputed portion.

Within 30 calendar days of receipt of a claim, CITY may request in writing additional documentation supporting the claim or relating to defenses or claims CITY may have against the CONTRACTOR. If additional information is thereafter required, it shall be requested and provided pursuant to this subdivision, upon mutual agreement of CITY and the CONTRACTOR.

CITY’s written response to the claim, as further documented, shall be submitted to CONTRACTOR within 30 calendar days (if the claim is less than $50,000, within 15 calendar days) after receipt of the further documentation, or within a period of time no greater than that taken by CONTRACTOR in producing the additional information or requested documentation, whichever is greater.

Meet and Confer. If the CONTRACTOR disputes CITY’s written response, or CITY fails to respond within the time prescribed, the CONTRACTOR may so notify CITY, in writing, either within 15 calendar days of receipt of CITY’s response or within 15 calendar days of CITY’s failure to respond within the time prescribed, respectively, and demand an informal conference to meet and confer for settlement of the issues in dispute. Upon receipt of a demand, CITY shall schedule a meet and confer conference within 30 calendar days for settlement of the dispute.

Mediation. Within 14 calendar days following the conclusion of the meet and confer conference, if the claim or any portion of the claim remains in dispute, CITY shall provide the CONTRACTOR a written statement identifying the portion of the claim that remains in dispute and the portion that is undisputed. Any payment due on an undisputed portion of the claim shall be processed and made within 60 calendar days after CITY issues its written statement. Any disputed portion of the claim, as identified by CONTRACTOR in writing, shall be submitted to nonbinding mediation, with CITY and CONTRACTOR sharing the associated costs equally. CITY and CONTRACTOR shall mutually agree to a mediator within 14 calendar days after the disputed portion of the claim has been identified in writing unless the parties agree to select a mediator at a later time.

If the Parties cannot agree upon a mediator, each Party shall select a mediator and those mediators shall select a qualified neutral third party to mediate with regard to the disputed portion of the claim. Each Party shall bear the fees and costs charged by its respective mediator in connection with the selection of the neutral mediator.

For purposes of this section, mediation includes any nonbinding process, including, but not limited to, neutral evaluation or a dispute review board, in which an independent third party or board

Page 609 of 1852 ends

15 assists the Parties in dispute resolution through negotiation or by issuance of an evaluation. Any mediation utilized shall conform to the timeframes in this section.

Unless otherwise agreed to by CITY and CONTRACTOR in writing, the mediation conducted pursuant to this section shall excuse any further obligation under Section 20104.4 to mediate after litigation has been commenced.

The mediation shall be held no earlier than the date CONTRACTOR completes the Work or the date that CONTRACTOR last performs Work, whichever is earlier. All unresolved claims shall be considered jointly in a single mediation unless a new unrelated claim arises after mediation is completed.

Procedures After Mediation. If following the mediation, the claim or any portion remains in dispute, CONTRACTOR must file a claim pursuant to Chapter 1 (commencing with Section 900) and Chapter 2 (commencing with Section 910) of Part 3 of Division 3.6 of Title 1 of the Government Code. For purposes of those provisions, the running of the period of time within which a claim must be filed shall be tolled from the time CONTRACTOR submits his or her written claim pursuant to subdivision (a) until the time the claim is denied, including any period of time utilized by the meet and confer conference or mediation.

Civil Actions. The following procedures are established for all civil actions filed to resolve claims subject to this Section:

Within 60 calendar days, but no earlier than 30 calendar days, following the filing or responsive pleadings, the court shall submit the matter to non-binding mediation unless waived by mutual stipulation of both parties or unless mediation was held prior to commencement of the action in accordance with Public Contract Code section 9204 and the terms of these procedures.. The mediation process shall provide for the selection within 15 calendar days by both parties of a disinterested third person as mediator, shall be commenced within 30 calendar days of the submittal, and shall be concluded within 15 calendar days from the commencement of the mediation unless a time requirement is extended upon a good cause showing to the court.

If the matter remains in dispute, the case shall be submitted to judicial arbitration pursuant to Chapter 2.5 (commencing with Section 1141.10) of Title 3 of Part 3 of the Code of Civil Procedure, notwithstanding Section 1114.11 of that code. The Civil Discovery Act of 1986 (Article 3 (commencing with Section 2016) of Chapter 3 of Title 3 of Part 4 of the Code of Civil Procedure) shall apply to any proceeding brought under this subdivision consistent with the rules pertaining to judicial arbitration.

In addition to Chapter 2.5 (commencing with Section 1141.10) of Title 3 of Part 3 of the Code of Civil Procedure, (A) arbitrators shall, when possible, be experienced in construction law, and (B) any party appealing an arbitration award who does not obtain a more favorable judgment shall, in addition to payment of costs and fees under that chapter, also pay the attorney’s fees on appeal of the other party.

Government Code Claims. In addition to any and all Contract requirements pertaining to notices of and requests for compensation or payment for extra work, disputed work, claims and/or changed conditions, CONTRACTOR must comply with the claim procedures set forth in Government Code

Page 610 of 1852 ends

16 sections 900 et seq. prior to filing any lawsuit against the CITY. Such Government Code claims and any subsequent lawsuit based upon the Government Code claims shall be limited to those matters that remain unresolved after all procedures pertaining to extra work, disputed work, claims, and/or changed conditions have been followed by CONTRACTOR. If no such Government Code claim is submitted, or if any prerequisite Contractual requirements are not otherwise satisfied as specified herein, CONTRACTOR shall be barred from bringing and maintaining a valid lawsuit against the CITY. A Government Code claim must be filed no earlier than the date the work is completed or the date CONTRACTOR last performs work on the Project, whichever occurs first.

A Government Code claim shall be inclusive of all unresolved claims unless a new unrelated claim arises after the Government Code claim is submitted.

Non-Waiver. CITY’s failure to respond to a claim from CONTRACTOR within the time periods described in this Section or to otherwise meet the time requirements of this Section shall result in the claim being deemed rejected in its entirety. CITY’s failure to respond shall not waive CITY’s rights to any subsequent procedures for the resolution of disputed claims.

29. NON-DISCRIMINATION: Contractor represents that it is an equal opportunity employer and that it shall not discriminate against any employee or applicant for employment because of race, religion, color, national origin, ancestry, sex, age or other interests protected by the State or Federal Constitutions. Such non-discrimination shall include, but not be limited to, all activities related to initial employment, upgrading, demotion, transfer, recruitment or recruitment advertising, layoff or termination. A violation of this section exposes CONTRACTOR to the penalties provided for in Labor Code Section 1735.

30. TERMINATION: This Contract may be terminated by CITY at any time, either with or without cause, by giving CONTRACTOR three (3) calendar days advance written notice. In the event of termination by CITY for any reason other than the fault of CONTRACTOR, CITY shall pay CONTRACTOR for all Work performed up to that time as provided herein. In the event of breach of the Contract by Contractor, CITY may terminate the Contract immediately without notice, may reduce payment to CONTRACTOR in the amount necessary to offset CITY’s resulting damages, and may pursue any other available recourse against CONTRACTOR. CONTRACTOR may not terminate this Contract except for cause. In the event this Contract is terminated in whole or in part as provided, CITY may procure, upon such terms and in such manner as it may determine appropriate, services similar to those terminated. Further, if this Contract is terminated as provided, CITY may require CONTRACTOR to provide all finished or unfinished documents, data, diagrams, drawings, materials or other matter prepared or built by CONTRACTOR in connection with its performance of this Contract.

31. ANTI-TRUST CLAIMS: This provision shall be operative if this Contract Agreement is applicable to California Public Contract Code Section 7103.5. In entering into this Contract Agreement to supply goods, services or materials, Contractor hereby offers and agrees to assign to the Agency all rights, title, and interest in and to all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C. Section 15) or under the Cartwright Act (Chapter 2, commencing with Section 16700, of Part 2 of Division 7 of the Business and Professions Code) arising from purchases of goods, services, or materials pursuant to the Contract Agreement. This assignment shall be made and become effective at the time the Agency tender final payment to Contractor, without further acknowledgment by the Parties.

Page 611 of 1852 ends

17 32. NO THIRD-PARTY BENEFICIARY. This Contract and every provision herein are for the exclusive benefit of the Contractor and the City and not for the benefit of any other party. There will be no incidental or other beneficiaries of any of the Contractor’s or the City’s obligations under this Contract.

33. TIME IS OF ESSENCE. Time is of the essence for each and every provision of the Contract Documents.

34. FORCE MAJEURE. If CONTRACTOR is delayed in the performance or progress of the work by a Force Majeure Event, then the CONTRACTOR shall be entitled to a time extension, as provided in the Contract documents, when the work stopped is on the critical path and shall not be charged liquidated damages. Such a non-compensable adjustment shall be CONTRACTOR’s sole and exclusive remedy for such delays and the CONTRACTOR will not receive an adjustment to the Contract price or any other compensation. Contractor must submit a timely request in accordance with the requirements of the Contract documents. A Force Majeure Event shall mean an event that materially affects a party’s performance and is one or more of the following: (1) Acts of God or other natural disasters occurring at the project site; (2) terrorism or other acts of a public enemy; (3) orders of governmental authorities (including, without limitation, unreasonable and unforeseeable delay in the issuance of permits or approvals by governmental authorities that are required for the work); (4) pandemics, epidemics or quarantine restrictions; and (5) strikes and other organized labor action occurring at the project site and the effects thereof on the work, only to the extent such strikes and other organized labor action are beyond the control of CONTRACTOR and its subcontractors, of every tier, and to the extent the effects thereof cannot be avoided by use of replacement workers. For purposes of this section, “orders of governmental authorities,” includes ordinances, emergency proclamations and orders, rules to protect the public health, welfare and safety, and other actions of the City in its capacity as a municipal authority.

35. PROVISIONS REQUIRED BY LAW AND CONTRACTOR COMPLIANCE. Each and every provision of law required to be included in these Contract Documents shall be deemed to be included in these Contract Documents. The Contractor shall comply with all requirements of applicable federal, state and local laws, rules and regulations, including, but not limited to, the provisions of the California Labor Code and California Public Contract Code which are applicable to this Work.

36. ACCEPTANCE OF FACSIMILE SIGNATURES. The Parties agree that this Contract, agreements ancillary to this Contract, and related documents to be entered into in connection with this Contract will be considered signed when the signature of a party is delivered by facsimile transmission. Such facsimile signature will be treated in all respects as having the same effect as an original signature.

37. GOVERNING LAW: This Agreement shall be governed by the laws of the State of California, and exclusive venue for any action involving this Contract will be in Los Angeles County.

Page 612 of 1852 ends

18 IN WITNESS WHEREOF, the parties hereto have executed this Agreement with all the formalities required by law on the respective dates set forth opposite their signatures.

State of California
CONTRACTOR'S License No. __

CONTRACTOR

_________________ By: ____________________________________________ Date TITLE

CITY OF HERMOSA BEACH, CALIFORNIA
_________________ By: ____________________________________________ Date MAYOR
ATTEST:

By: ____________________________________________
Date CITY CLERK
CONTRACTOR'S Business Phone
Emergency Phone at which CONTRACTOR can be reached at any time: ( ) APPROVED AS TO FORM:
_______________________________________________________________

CITY ATTORNEY
__________________
Date

Page 613 of 1852 ends
Page 1 of 3 ends

CITY OF HERMOSA BEACH
RESOLUTION NO. 24-XXXX

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF HERMOSA BEACH, CALIFORNIA APPROVING THE CONSTRUCTION OF CIP 105 ANNUAL STREET IMPROVEMENTS AND CIP 695 PARKING LOT A
IMPROVEMENTS PURSUANT TO GOVERNMENT CODE SECTION 830.6

AND ESTABLISHING A PROJECT PAYMENT ACCOUNT
WHEREAS, The City solicited competitive bids for the Annual Street Improvements and Parking Lot A Improvements; and
WHEREAS, Bids were received and opened publicly on January 15, 2025, and Hardy & Harper, Inc. was chosen as the lowest responsible and responsive bidder; WHEREAS, The City Council, desires to confirm City staff’s decision and award the construction contract to the lowest responsible bidder, Hardy & Harper, Inc. for the Annual Street Improvements and Parking Lot A Improvements project;

NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF HERMOSA BEACH, CALIFORNIA, DOES HEREBY RESOLVE AS FOLLOWS:

SECTION 1. On January 15, 2025 the City received a total of seven (7) bids which are summarized below:

BIDDER BID AMOUNT
Hardy & Harper, Inc. $3,200,000
Sully-Miller Contracting Company $3,220,975
PALP dba Excel Paving Company $3,498,600
Sequel Contractors, Inc. $3,573,417
Onyx Paving Company, Inc. $3,693,000
Toro Enterprises, Inc. $3,727,960

Page 614 of 1852 ends
Page 2 of 3 ends

All American Asphalt $3,759,295
SECTION 2. The City Council wishes to obtain the immunities set forth in Government Code § 830.6 with regards to the plans and construction of the Project. The City Engineer finds that the plans are complete, and the Project may be constructed.

SECTION 3. Design Immunity; Authorization
A. The design and plans for the Project are determined to be consistent with the City’s standards and are approved;
B. The design approval set forth in this Resolution occurred before actual work on the Project construction commenced;
C. The approval granted by this Resolution conforms with the City’s General Plan;
D. The City Engineer, or designee, is authorized to act on the City’s behalf in approving any alterations or modifications of the design and plans approved by this Resolution; and
E. The approval and authorization granted by this Resolution is intended to avail the City of the immunities set forth in Government Code § 830.6.

SECTION 4. For purposes of the Contract Documents administering the Project, the City establishes an account containing sufficient monies from the current fiscal year budget to pay for the project. This Account is the sole source of funds available for the Construction Sum as defined in the Contract Document administering the Project.

SECTION 5. The Project is exempt under the California Environmental Quality Act (“CEQA”) pursuant to CEQA Guidelines section 15301 (Existing Facilities) The proposed work surface improvements of an existing public roadway. No exceptions to the CEQA exemption apply.

SECTION 6. The City Clerk is directed to certify the adoption of this Resolution.

Page 615 of 1852 ends
Page 3 of 3 ends

SECTION 7. This Resolution will become effective immediately upon adoption.

PASSED, APPROVED, and ADOPTED on this 25th day of February, 2025.

Mayor Dean Francois
PRESIDENT of the City Council and MAYOR of the City of Hermosa Beach, CA ATTEST: APPROVED AS TO FORM:
________________________________ ________________________________ Reanna Guzman Patrick Donegan,
Acting City Clerk City Attorney

Page 616 of 1852 ends

Pier Ave Valley Drive
9th St 11th Pl 14th St 15th St 16th St Power St
Morningside Dr
Longfellow Ave
32nd Pl
Parking Lot A Page 617 of 1852
City of Hermosa Beach
BID 24-010 | CIP No. 105
Annual Street Improvements and CIP 695 Parking Lot A Improvements Opened By: Reanna Guzman Staff Present: Briana Aube and Heecheol Kwon Attested:

Acting City Clerk Signature: ___________________________ Date: January 15, 2025 # COMPANY COMPANY CONTACT
(If Applicable)

BID RECEIVED

DATE/TIME

AMOUNT OF
BID

BID BOND
10%
ADDEND
A

1. PALP dbs Excel Paving
Company
Crissa Phillips
562-599-5841
[email protected]
1/15/2025
1:45 PM $3,498,600.00 Yes NA

2. Sequel Contractors, Inc.

Mike Mahler
562-802-7227
[email protected]
1/15/2025
1:47 PM $3,573,417.00 Yes NA

3. All American Asphalt
Ed J. Carlson
951-736-7600
[email protected]
1/15/2025
1:49 PM $3,759,295.00 Yes NA

4. Sully-Miller Contracting
Company
Anthony Lino
714-578-9600
[email protected]
1/15/2025
1:52:50 PM
$3,220,975.00 Yes NA

5. TORO ENTERPRISES, INC
Tyson Rising
805-483-4515
[email protected]
1/15/2025
1:52:59 PM
$3,727,960.00 Yes NA

6. Onyx Paving Company,
Inc.

COREY R. KIRSCHNER
714-632-6699
[email protected]
1/15/2025
1:55 PM $3,693,000.00 Yes NA

7. Hardy & Harper, Inc.

Morgan Churnock
714-444-1851 ext. 121
[email protected]
1/15/2025
1:57 PM $3,200,000.00 Yes NA

Page 618 of 1852 ends
Page 619 of 1852 ends
Page 620 of 1852 ends
Page 621 of 1852 ends
Page 622 of 1852 ends
Page 623 of 1852 ends
Page 624 of 1852 ends
Page 625 of 1852 ends
Page 626 of 1852 ends
Page 627 of 1852 ends
Page 628 of 1852 ends
Page 629 of 1852 ends
Page 630 of 1852 ends
Page 631 of 1852 ends
Page 632 of 1852 ends
Page 633 of 1852 ends
Page 634 of 1852 ends
Page 635 of 1852 ends
Page 636 of 1852 ends
Page 637 of 1852 ends
Page 638 of 1852 ends
Page 639 of 1852 ends
Page 640 of 1852 ends
Page 641 of 1852 ends
Page 642 of 1852 ends
Page 643 of 1852 ends
Page 644 of 1852 ends
Page 645 of 1852 ends
Page 646 of 1852 ends
Page 647 of 1852 ends
Page 648 of 1852 ends
Page 649 of 1852 ends
Page 650 of 1852 ends
Page 651 of 1852 ends
Page 652 of 1852 ends
Page 653 of 1852 ends
Page 654 of 1852 ends

C I T Y O
F

H E R M O S A B E A
C H , C A 1 9 0 N7
HOMER ST. CITY OF HERMOSA BEACH CIP 105 ANNUAL STREET IMPROVEMENTS AND CIP 695 PARKING LOT A IMPROVEMENTS 1. CONSTRUCTION WORK HOURS ARE LIMITED TO 8:00AM TO 6:00 PM, MONDAY THROUGH FRIDAY. WORK IS PROHIBITED ON SATURDAYS, SUNDAYS, AND HOLIDAYS AS DEFINED IN THE SPECIAL PROVISIONS. 2. ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE CONTRACT DOCUMENTS, THE LATEST EDITION OF THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION (“GREENBOOK”), AND ALL OTHER CONTRACTUAL REQUIREMENTS 3. ALL WORK DONE WITHIN THE PUBLIC RIGHT-OF-WAY SHALL BE DONE BY A LICENSED CONTRACTOR WITH A CLASS A LICENSE. 4. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO OBTAIN ALL NECESSARY PERMITS FROM THE CITY AND ANY OTHER JURISDICTIONAL AGENCIES REQUIRED TO ACCOMPLISH ALL WORK WITHIN THE PUBLIC RIGHT-OF-WAY. NO WORK SHALL START UNTIL ALL NECESSARY PERMITS ARE OBTAINED. 5. ALL WORK IS SUBJECT TO THE REQUIREMENTS OF THE PERMIT(S) OF THE CITY OF HERMOSA BEACH INCLUDING, BUT NOT LIMITED TO, BARRICADES, TRAFFIC CONTROL, BACKFILL COMPACTION, PAVEMENT REPAIRS, ETC. 6. ALL CONTRACTORS WORKING ON PUBLIC WORKS PROJECTS MUST HAVE A CURRENT CITY OF HERMOSA BEACH BUSINESS LICENSE. 7. THE CONTRACTOR SHALL PROVIDE WRITTEN NOTIFICATION TO THE PUBLIC WORKS DEPARTMENT ON A CITY-PROVIDED PUBLIC NOTICE FORM FOR APPROVAL THEN, UPON APPROVAL, DISTRIBUTE THE NOTICE TO ALL AFFECTED PROPERTIES AT LEAST 72 HOURS IN ADVANCE OF START OF CONSTRUCTION. NOTICE SHALL INFORM THE PUBLIC OF ALL CONSTRUCTION OPERATIONS INCLUDING ANY STREET CLOSURE OR PARKING RESTRICTION. 8. THE CONTRACTOR SHALL NOTIFY BUS COMPANIES OF ANY STREET CLOSURES AT LEAST 72 HOURS PRIOR TO THE COMMENCEMENT OF WORK. THE CONTRACTOR SHALL COORDINATE THE TEMPORARY RELOCATION OF ANY BUS STOP IMPACTED BY CONSTRUCTION; SEE AGENCY CONTACTS FOR CONTACT INFORMATION. 9. THE CONTRACTOR SHALL FAMILIARIZE THEMSELVES WITH THE PLANS PRIOR TO COMMENCING WORK. SHOULD CONFLICTING INFORMATION BE FOUND ON THE PLANS, THE CONTRACTOR SHALL NOTIFY THE ENGINEER BEFORE PROCEEDING WITH THE WORK IN QUESTION. 10. PRIOR TO COMMENCING CONSTRUCTION, THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE FIELD INCLUDING DIMENSIONS AND SOIL CONDITIONS. IF THE FIELD CONDITIONS DIFFER FROM THOSE SHOWN ON THE PLANS, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE ENGINEER AND SHALL NOT BEGIN CONSTRUCTION UNTIL THE CHANGED CONDITIONS HAVE BEEN EVALUATED AND ADDRESSED. ANY WORK PERFORMED IN CONFLICT WITH THE CONTRACT DOCUMENTS OR ANY APPLICABLE CODE REQUIREMENTS SHALL BE CORRECTED BY THE CONTRACTOR AT THEIR OWN EXPENSE AND AT NO EXPENSE TO THE CITY. 11. NOTES AND DETAILS ON THE DRAWINGS SHALL TAKE PRECEDENCE OVER GENERAL NOTES AND TYPICAL DETAILS. WHERE NO DETAILS ARE GIVEN CONSTRUCTION SHALL BE AS SHOWN FOR SIMILAR WORK. 12. THE CONTRACTOR SHALL SUPPLY ALL EQUIPMENT, LABOR, AND MATERIALS NECESSARY TO PERFORM THE WORK SHOWN ON THE PLAN. THE CONTRACTOR SHALL USE ADEQUATE NUMBERS OF SKILLED WORKERS WHO ARE THOROUGHLY TRAINED AND EXPERIENCED IN THE NECESSARY CRAFTS AND WHO ARE COMPLETELY FAMILIAR WITH THE SPECIFIED REQUIREMENTS AND THE METHODS REQUIRED PRIOR TO PERFORMANCE OF THE WORK. 13. THE CONTRACTOR SHALL COORDINATE ALL WORK, INCLUDING SUBCONTRACTORS' WORK, SO AS TO ELIMINATE CONFLICTS AND WORK TOWARD THE GENERAL COMPLETION OF THE ENTIRE PROJECT WITHIN THE CONTRACT PERIOD. 14. THE CONTRACTOR SHALL REPLACE ALL EXISTING IMPROVEMENTS (PAVEMENT, STRIPING, RAISED MARKERS, ETC.) DAMAGED DURING CONSTRUCTION IN KIND AND TO THE SAME OR BETTER CONDITION. 15. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE OR EXCESSIVE WEAR AND TEAR TO ROADS, OR ADJACENT PUBLIC OR PRIVATE PROPERTY CAUSED BY CONSTRUCTION-RELATED WORK AND SHALL BE RESPONSIBLE TO IMPLEMENT MEASURES TO PREVENT SUCH DAMAGE. 16. ANY ASPHALT OR CONCRETE PAVEMENT WITHIN THE PROPERTY LIMITS THAT IS DAMAGED DURING CONSTRUCTION SHALL BE REMOVED AND REPLACED TO MEET CURRENT GREENBOOK STANDARDS. 17. ALL EXISTING SURFACE FEATURES SHALL BE PROTECTED IN PLACE UNLESS OTHERWISE NOTED. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGES DURING CONSTRUCTION. 18. ANY PUBLIC PROPERTY DAMAGED DURING CONSTRUCTION SHALL BE REPLACED IN KIND OR BETTER TO THE SATISFACTION OF THE PUBLIC WORKS INSPECTOR OR ENGINEER. THE CITY SHALL, AT ITS DISCRETION AND IN THE INTEREST OF PUBLIC SAFETY, MAKE ANY REPAIRS DEEMED NECESSARY; THE COST OF SUCH REPAIRS SHALL BE DEDUCTED FROM THE CONTRACT COST. 19. GRAFFITI IN FRESHLY POURED CONCRETE SHALL BE REMOVED BY WHATEVER MEANS NECESSARY UP TO AND INCLUDING REMOVAL AND REPLACEMENT. 20. UNLESS OTHERWISE NOTED, ALL TRAFFIC SIGNS SHALL BE PROTECTED IN PLACE BY THE CONTRACTOR. 21. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING AN APPROVED COPY OF CONSTRUCTION PLANS AT THE PROJECT SITE DURING CONSTRUCTION. ALL DRAWINGS ARE CONSIDERED PART OF THE CONTRACT DOCUMENTS. 22. THE CONTRACTOR SHALL MAKE AVAILABLE FOR THE INSPECTOR'S REVIEW, ON A DAILY BASIS, AS-BUILT DRAWINGS FOR WORK PERFORMED UP TO AND INCLUDING THE PREVIOUS DAY'S ACTIVITIES. WORK SHALL NOT BE CONSIDERED COMPLETE UNTIL AS-BUILT DRAWINGS ARE SUBMITTED AND ACCEPTED BY THE PUBLIC WORKS DIRECTOR. UTILITIES: 23. THE CONTRACTOR SHALL CALL IN A LOCATION REQUEST TO UNDERGROUND SERVICE ALERT (USA) AT (800) 227-2600 AT LEAST 72 HOURS BEFORE PERFORMING ANY DIGGING. SECTION 4216/4217 OF THE GOVERNMENT CODE REQUIRES THAT A DIGALERT IDENTIFICATION NUMBER BE ISSUED BEFORE A “PERMIT TO EXCAVATE” WILL BE VALID. THE CONTRACTOR SHALL PROVIDE THE DIGALERT NUMBER TO THE CITY, AND UPON EXPOSING ANY UNDERGROUND FACILITY, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THAT UTILITY COMPANY. 24. EXISTING UTILITIES AND STRUCTURES (UNDERGROUND, SURFACE, OR OVERHEAD) ARE INDICATED ONLY TO THE EXTENT THAT SUCH INFORMATION WAS KNOWN, MADE AVAILABLE TO, OR DISCOVERED BY THE DESIGNER IN PREPARING THE DRAWINGS. THE LOCATIONS, CONFIGURATIONS, AND PLAN VIEW ELEVATIONS OF SUBSURFACE FACILITIES ARE APPROXIMATE AND NOT ALL UTILITIES AND FACILITIES MAY BE INDICATED. 25. THE CONTRACTOR SHALL DETERMINE THE LOCATIONS, DEPTH, MATERIAL, CONDITIONS, ROUNDNESS, AND SIZE OF ALL UTILITIES, AND SUBSTRUCTURES INCLUDING SERVICE CONNECTIONS AND LATERALS WITHIN THE ALIGNMENT AND WORK LIMITS OF THE PROPOSED IMPROVEMENTS. 26. THE CONTRACTOR SHALL BEAR THE COST OF REPAIRING OR REPLACING ANY OF SAID STRUCTURES DAMAGED BY THEM DURING THE PROSECUTION OF THE WORK. ALL REPAIRS AND REPLACEMENTS SHALL BE DONE IN THE PRESENCE OF THE INSPECTOR. ALL LOCATIONS SHOWN ON THE PLANS FOR UTILITIES HAVE BEEN TAKEN FROM AVAILABLE RECORDS AND THEIR COMPLETENESS AND CORRECTNESS ARE IN NO WAY GUARANTEED. 27. BEFORE CONSTRUCTION IS STARTED, CONTRACTOR SHALL COORDINATE WITH THE OWNER OF EACH UTILITY AND DEFINE THE REQUIREMENTS AND METHODS TO ACCOMMODATE THE PROTECTION, TEMPORARY SUPPORT, ADJUSTMENT, OR RELOCATION OF ANY UTILITIES AFFECTED BY THE PROPOSED WORK. THE CONTRACTOR SHALL EXERCISE CARE WHEN WORKING NEAR EXISTING UTILITIES AND SHALL BE RESPONSIBLE FOR ALL DAMAGE, BREAKAGE, OR LEAKS CAUSED BY THEIR WORK. 28. ALL EXISTING UTILITIES SHALL BE MAINTAINED AND PROTECTED IN PLACE BY THE CONTRACTOR UNLESS OTHERWISE NOTED. EXISTING UTILITIES AND/OR NEW IMPROVEMENTS SHALL BE SUPPORTED AS REQUIRED BY THE ENGINEER IN ACCORDANCE WITH SPPWC STANDARD PLAN 224-3. 29. ALL FIRE HYDRANTS, WATER CONTROL VALVES, AND MAINTENANCE HOLES SHALL BE KEPT FREE FROM OBSTRUCTIONS AND AVAILABLE FOR USE. 30. IT WILL BE THE CONTRACTOR'S RESPONSIBILITY TO ADJUST TO FINISHED GRADE EXISTING SEWER AND STORM DRAIN MAINTENANCE MANHOLES AND COVERS AND ALL OTHER UTILITY BOX AND VALVE COVERS. WHERE APPLICABLE, CONCRETE COLLARS SHALL BE INSTALLED TO MATCH FINISHED GRADE WHETHER INDICATED ON THE PLANS OR NOT. 31. SEPARATION OF SEWER AND WATER FACILITIES SHALL BE IN CONFORMANCE WITH THE LATEST EDITION OF THE STATE OF CALIFORNIA DEPT OF HEALTH SERVICES. 32. SEWER LATERALS SHALL BE CONNECTED TO THE SEWER MAIN WITH WYES. 33. SEWER LINES SHALL BE TESTED PRIOR TO MAKING PERMANENT SERVICE CONNECTIONS. 34. IN ADDITION TO ITEMS LISTED IN THESE PLANS, THE CONTRACTOR SHALL FURNISH ALL NECESSARY ADAPTORS, COUPLINGS, BOLTS, GASKETS, CAULKING MATERIALS, AND REPAVING MATERIALS AS REQUIRED TO COMPLETE THE WORK. 35. PIPES SHALL BE CONSTRUCTED SO AS TO PROVIDE THE FOLLOWING MINIMUM CLEARANCES TO EXISTING OR OTHER PROPOSED UNDERGROUND CONDUITS OR STRUCTURES (UNLESS OTHERWISE NOTED ON PLANS OR IN SPECS): a. HORIZONTAL: 24-INCHES OUTSIDE DIAMETER TO OUTSIDE DIAMETER b. VERTICAL: 12-INCHES OUTSIDE DIAMETER TO OUTSIDE DIAMETER 36. CONTRACTOR SHALL ADJUST SEWER MAIN ALIGNMENTS AS REQUIRED TO MAINTAIN MINIMUM CLEARANCE BETWEEN WATER MAIN AND OTHER EXISTING UTILITIES, VAULTS, MANHOLES, STRUCTURES, AND SUBSURFACE FACILITIES AT NO ADDITIONAL COST TO THE CITY. PIPELINE CONSTRUCTION IN THE VICINITY OF WATER MAINS SHALL, AT A MINIMUM, CONFORM TO THE LOS ANGELES COUNTY WATERWORKS DISTRICTS STD. PLAN W-50. 37. ALL CROSSING UTILITIES SHALL HAVE A MINIMUM 12-INCH CLEARANCE UNLESS OTHERWISE NOTED. 38. CONTRACTOR SHALL POTHOLE AND VERIFY DEPTH, LOCATION, AND DIMENSIONS OF EXISTING FACILITIES AND CONNECTION POINTS PRIOR TO CONSTRUCTION OF MAINS. 39. LOCATIONS OF EXISTING SEWER, GAS, AND WATER SERVICE LATERALS ARE NOT SHOWN ON THE PLANS. CONTRACTOR SHALL PROTECT IN PLACE ALL EXISTING SERVICES UNLESS OTHERWISE NOTED. 40. BACKFILL OF TRENCHES SHALL BE DONE IN LIFTS OF NO MORE THAN 8-INCHES WITH WATER AND APPROPRIATE COMPACTION TOOLS USED BETWEEN EACH LIFT. ONE SACK SLURRY MIX CAN BE USED IN PLACE OF NATIVE SOIL. AFTER BACKFILLING THE TRENCH, A TEMPORARY ASPHALT PATCH SHALL BE PLACED OVER THE TRENCH AND REMAIN FOR NO MORE THAN TWO WEEKS. THE FINAL PATCH SHALL BE A MINIMUM OF 5” THICK OR 1” THICKER THAN THE EXISTING PAVEMENT. THE CONTRACTOR SHALL FOLLOW THE LATEST EDITION OF THE STANDARD PLANS FOR PUBLIC WORKS CONSTRUCTION 113-2, 132-4, 133-4 AND THE LATEST HERMOSA BEACH PUBLIC WORKS STANDARD PLANS 117. 41. THE FINAL PATCH ON ASPHALT STREETS SHALL BE PER THE LATEST EDITION OF THE STANDARD PLANS FOR PUBLIC WORKS CONSTRUCTION 133-4. 42. THE FINAL PATCH ON CONCRETE STREETS SHALL BE PER THE LATEST EDITION OF THE STANDARD PLANS FOR PUBLIC WORKS CONSTRUCTION 132-4. TRAFFIC CONTROL GENERAL NOTES: 43. THE CONTRACTOR MAY PROHIBIT PARKING WITHIN THE CONSTRUCTION LIMITS AND AS NECESSARY TO COMPLETE THE WORK, SUBJECT TO THE APPROVAL OF THE ENGINEER. ACCESS TO ALL RESIDENCES AND BUSINESSES SHALL BE MAINTAINED AT ALL TIMES. IT IS THE CONTRACTOR'S RESPONSIBILI TY TO POST “NO PARKING” SIGNS WITH SPECIFIC TIME FRAMES ON CITY-APPROVED SIGNS AT LEAST 72 HOURS PRIOR TO THE COMMENCEMENT OF WORK. 44. TRAFFIC CONTROL DEVICES AND METHODS SHALL CONFORM TO THE REQUIREMENTS OF THE STATE OF CALIFORNIA MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES (CAMUTCD), LATEST REVISION, AND WORK AREA TRAFFIC CONTROL HANDBOOK (WATCH MANUAL), LATEST EDITION. 45. ALL STREET CLOSURES REQUIRE A TRAFFIC CONTROL PLAN TO BE REVIEWED AND APPROVED BY THE CITY ENGINEER PRIOR TO CONSTRUCTION. 48. ANY WALLS, FENCES, STRUCTURES, AND/OR APPURTENANCES ADJACENT TO THIS PROJECT EITHER IN THE PUBLIC RIGHT-OF-WAY OR ON PRIVATE PROPERTY SHALL BE PROTECTED IN PLACE, UNLESS OTHERWISE NOTED. IF THE CONTRACTOR'S ACTIVITIES DAMAGE OR ADVERSELY AFFECT SAID ITEMS IN ANY WAY, THE CONTRACTOR IS RESPONSIBLE FOR WORKING OUT AN ACCEPTABLE SOLUTION TO THE SATISFACTION OF THE AFFECTED PROPERTY OWNERS AT THE CONTRACTOR'S COST. 49. THE CONTRACTOR SHALL BE RESPONSIBLE DURING ALL PHASES OF THE WORK FOR PROVIDING PUBLIC SAFETY AND CONVENIENCE. 50. THE CONTRACTOR SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR THE JOB SITE CONDITIONS, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY, DURING THE COURSE OF CONSTRUCTION, AND UNTIL THE DATE OF THE NOTICE OF COMPLETION. THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND SHALL NOT BE LIMITED TO WORKING HOURS DESCRIBED IN THE PROJECT SPECIFICATIONS. 51. IN THE CASE OF SUSPENSION OF THE WORK FOR ANY CAUSE WHATSOEVER, THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL MATERIALS AND SHALL PROPERLY STORE THEM IF NECESSARY AND SHALL ERECT TEMPORARY STRUCTURE(S) WHERE NECESSARY. THE CITY WILL NOT BE HELD RESPONSIBLE FOR THE CARE OR PROTECTION OF ANY MATERIAL OR PARTS OF THE WORK PRIOR TO FINAL ACCEPTANCE, UNLESS OTHERWISE SPECIFIED. 52. THE CONTRACTOR IS RESPONSIBLE TO OBTAIN THEIR OWN STAGING AREA FOR ALL TOOLS, EQUIPMENT, MATERIAL, AND PARKING. AT THE END OF EACH DAY, THE CONTRACTOR SHALL REMOVE ALL MATERIALS, DEBRIS, FOREIGN MATERIAL, AND EQUIPMENT FROM THE JOB SITE UNLESS OTHERWISE APPROVED BY THE ENGINEER. 53. THE PUBLIC RIGHT-OF-WAY SHALL NOT BE USED FOR A STAGING AREA AS DESCRIBED ABOVE UNLESS OTHERWISE AUTHORIZED BY THE CITY. 54. WATER SHALL BE PROVIDED ON SITE AND USED TO CONTROL DUST DURING CONSTRUCTION OPERATIONS. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING A HYDRANT METER FROM CAL WATER (CALL (310) 420-7730) AND PAY FOR CONSTRUCTION WATER. 55. AS REQUIRED BY THE ENGINEER, THE CONTACTOR SHALL FURNISH AND OPERATE A SELF-LOADING MOTOR SWEEPER WITH SPRAY NOZZLES AT LEAST TWICE EACH WORKING DAY TO KEEP PAVED AREAS ACCEPTABLY CLEAN WHEREVER CONSTRUCTION, INCLUDING RESTORATION, IS INCOMPLETE. 56. PROPER BARRICADES SHALL BE PLACED AROUND ANY CONSTRUCTION SITE WITHIN THE PUBLIC RIGHT-OF-WAY. THESE BARRICADES SHALL COMPLY WITH THE REQUIREMENTS OF THE WATCH MANUAL. 57. ALL VEHICLES THAT INTRUDE INTO A NORMAL TRAFFIC LANE MUST HAVE PROPER SIGNAGE AND BARRICADES AS REQUIRED BY THE WATCH MANUAL. 58. ALL WORK VEHICLES ARE SUBJECT TO ALL APPLICABLE PARKING RESTRICTIONS. 59. FLAGMEN ARE REQUIRED FOR ANY VEHICLES THAT BLOCK THE TRAVEL LANE AND REQUIRE TRAFFIC TO USE THE OPPOSING LANE TO PASS. SURVEY / LAYOUT 60. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROTECTION OF ALL SURVEY MONUMENTS INCLUDING PROPERTY CORNER MARKERS, UNLESS OTHERWISE NOTED ON THE PLANS. PRIOR TO COMMENCEMENT OF WORK ALL SURVEY MONUMENTS IN THE PROJECT AREA SHALL BE LOCATED AND TIED OUT. THE CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR REPLACING ANY SURVEY MONUMENTS THAT ARE DISTRIBUTED DURING CONSTRUCTION. PROPERTY CORNER MARKERS AND SURVEY MONUMENTS DAMAGED BY CONSTRUCTION ACTIVITIES SHALL BE RE-ESTABLISHED BY A PROFESSIONAL SURVEYOR LICENSED IN THE STATE OF CALIFORNIA. 61. CONSTRUCTION STAKING FOR IMPROVEMENTS SHOWN ON THESE PLANS SHALL BE PERFORMED BY A PROFESSIONAL SURVEYOR LICENSED IN THE STATE OF CALIFORNIA. 62. ALL SURVEY POINTS AND MONUMENTS SHALL BE PROTECTED IN PLACE OR RESET AND RECORDED IF THEY ARE REMOVED OR DESTROYED DURING CONSTRUCTION. LANDSCAPE 63. TREES AND FOLIAGE (TO DRIP LINE), SIGNS, PARKING METERS, AND OTHER IMPROVEMENTS SHALL BE PROTECTED IN PLACE, UNLESS OTHERWISE NOTED, AND ANY DAMAGE TO EXISTING IMPROVEMENTS SHALL BE REPAIRED OR THE IMPROVEMENTS REPLACED IN KIND AT THE CONTRACTOR'S EXPENSE. 64. TREES WITHIN THE PUBLIC RIGHT-OF-WAY MAY NOT BE REMOVED WITHOUT AUTHORIZATION FROM THE ENGINEER AND ARE TO BE PROTECTED FROM INJURY OR DAMAGE DURING CONSTRUCTION. 65. THE CONTRACTOR SHALL NOTIFY THE PUBLIC WORKS DEPARTMENT PRIOR TO ANY TRIMMING, REMOVING, OR RELOCATING OF AN EXISTING STREET TREE. 66. FOR ANY TREE REMOVED DURING THE COURSE OF CONSTRUCTION, THE TREE SHALL BE REPLACED BY TWO IN KIND IN LOCATIONS DETERMINED BY THE ENGINEER. (CONTINUED ON SHEET 2) HERMOSA BEACH NORTH REDONDO PROJECT LOCATION ARTESIA BOULEVARD MANHATTAN BEACH BOULEVARD 190TH STREET

INGLEWOOD AVENUE

PRAIRIE AVENUE HERMOSA AVE

PACIFIC COAST SAN DIEGO

FREEWAY
HIGHWAY PACIFIC OCEAN LONGFELLOW AVE.

HIGHLAND AVE.

AVIATION BLVD

RIPLEY AVE GRANT AVE PROSPECT AVE

PIER AVE

VALLEY DR
9TH ST
11TH PL 14TH ST 15TH STOCEAN DR 16TH ST

POWER ST

MORNINGSIDE DR
3ND PL 31ST ST
21ST ST
19TH ST

C I T Y O
F

H E R M O S A B E A
C H , C A 1 9 0 N7 30TH ST LONGFELLOW AVE HERMOSA AVE HERMOSA BEACH PUBLIC WORKS GENERAL NOTES: SHEET INDEX SHEET REF. # DESCRIPTION 1234567891011121314 T-1 T-2 ST-1 ST-2 ST-3 ST-4 ST-5 ST-6 SS-1 SS-2 SS-3 SS-4 PA-1 PA-2 TITLE SHEET CONSTRUCTION NOTES DETAIL SHEET STREET PLANS SIGNING & STRIPING PLANS PARKING LOT A IMPROVEMENT PLAN PARKING LOT A IMPROVEMENT PLAN STREET PLANS STREET PLANS STREET PLANS STREET PLANS SIGNING & STRIPING PLANS SIGNING & STRIPING PLANS SIGNING & STRIPING PLANS PARKING LOT A STRIPING PLAN PARKING LOT A STRIPING PLAN 15 PA-3 16 PA-4 SITE CONTROL / SAFETY: 46. THE CONTRACTOR SHALL COMPLY WITH ALL LOCAL SOUND CONTROL AND NOISE LEVEL RULES, REGULATIONS, AND ORDINANCES WHICH 47. ALL CONSTRUCTION SHALL BE IN CONFORMANCE WITH THE REGULATIONS OF CAL-OSHA. APPLY TO ANY WORK PERFORMED PURSUANT TO THE CONTRACT. 28TH ST 12/11/24 12/11/24

Page 655 of 1852 ends

2" COLD MILL AND 2" ARHM OVERLAY REMOVE AND REPLACE PAVEMENT (AC+BASE) CONCRETE REPAIR AREA STORMDRAIN MANHOLE FIRE HYDRANT SEWER MANHOLE WATER VALVE GRATE ELECTRICAL BOX/VAULT R/WCONSTRUCTION CENTERLINE L ASPHALT CONCRETE CENTERLINE EXISTING INLTMH INCH LEFT MANHOLE C OR CL EX. OR EXIST SSSPPWC SANITARY SEWER STANDARD PLANS FOR PUBLIC WORKS CONSTRUCTION N.T.S. NOT TO SCALE L LENGTH VAR VARIES MIN MINIMUM TYP TYPICAL LF LINEAR FEET FT FEET EA EACH H HEIGHT ST STREET LAT LATERAL R/WSD RIGHT OF WAY STORM DRAIN MAX MAXIMUM STA STATION ACSTD STANDARD HERMOSA BEACH PUBLIC WORKS GENERAL NOTES: ABBREVIATIONS: LANDSCAPE (CONTINUED FROM SHEET 1) 67. PLANTED AND IRRIGATED PARKWAY(S), IF REQUIRED, SHALL HAVE MATERIALS AND PLANTS APPROVED BY THE ENGINEER PRIOR TO INSTALLATION. EROSION CONTROL: 68. THE CONTRACTOR SHALL MAINTAIN AND CLEAN, IF NECESSARY, ALL EXISTING ON-SITE AND ADJACENT STORM DRAIN INLETS DURING THE COURSE OF CONSTRUCTION AND UNTIL THE WORK IS FORMALLY ACCEPTED BY THE CITY. 69. ALL DEBRIS AND FOREIGN MATERIAL SHALL BE REMOVED FROM THE SITE AND DISPOSED OF AT AN APPROVED DISPOSAL SITE. THE CONTRACTOR SHALL OBTAIN NECESSARY PERMITS FOR THE TRANSPORTATION OF MATERIAL TO AND FROM THE SITE. THE REMOVAL AND DISPOSAL OF DEMOLITION ITEMS (TREES, PAVEMENT, SOIL, ETC.) SHALL BE AT THE CONTRACTOR'S EXPENSE. 70. THE CONTRACTOR IS ADVISED THAT ALL MATERIAL AND DEBRIS CREATED BY REMOVAL OPERATIONS SHALL BECOME THE CONTRACTOR'S PROPERTY AND SHALL BE REMOVED FROM THE JOB SITE IN A MANNER AND AT A LOCATION ACCEPTABLE TO ALL AGENCIES AFFECTED BY THE WORK UNLESS INSTRUCTED BY THE ENGINEER OTHERWISE. THE CITY SHALL HAVE RIGHT OF FIRST REFUSAL FOR SALVAGEABLE PARTS, AND IF INSTRUCTED BY THE ENGINEER THE CONTRACTOR SHALL DELIVER SUCH PARTS TO THE CITY YARD. 71. THE CONTRACTOR SHALL PROTECT IN PLACE ALL EXISTING CURB DRAINS AND PARKWAY CULVERTS WHETHER SPECIFIED ON THE PLANS OR NOT. THE CONTRACTOR SHALL ENSURE DRAINS AND CULVERTS REMAIN FUNCTIONAL AT ALL TIMES. 72. THE CONTRACTOR SHALL PROVIDE INLET PROTECTION FOR ALL INLETS DOWNSTREAM OF THE WORK AREA IN ACCORDANCE WITH CASQA BMP SE-10. 73. PRIOR TO STORM EVENTS SOIL BINDER, STRAW WATTLE, OR OTHER EROSION CONTROL DEVICES MAY BE APPLIED AND SECURED TO DISTURBED OPEN AREAS DURING GRADING OPERATIONS IF DETERMINED NECESSARY BY THE CONTRACTOR OR ENGINEER. 74. REASONABLE CARE SHALL BE TAKEN WHEN HAULING ANY EARTH, SAND, GRAVEL, STONE, DEBRIS, OR ANY HAZARDOUS SUBSTANCE OVER ANY PUBLIC STREET, ALLEY, OR OTHER PUBLIC PLACE. SHOULD ANY MATERIAL BLOW, SPILL, OR TRACK OVER AND UPON SAID PUBLIC PLACE OR ADJACENT PRIVATE PROPERTY, IMMEDIATE CLEAN UP SHALL OCCUR. 75. THE CONTRACTOR SHALL CONSTRUCT TEMPORARY EROSION CONTROL MEASURES AS DIRECTED BY THE ENGINEER TO CONTROL DRAINAGE WHICH HAS BEEN AFFECTED BY GRADING AND/OR TRENCHING OPERATIONS. CONSTRUCTION / MATERIALS: 76. UNLESS OTHERWISE SPECIFICALLY MENTIONED ON THE PLANS, THE CONTRACTOR SHALL CONSTRUCT ALL SIDEWALKS, CURB RAMPS, AND STREET CROSSINGS IN COMPLIANCE WITH ADA STANDARDS AND REQUIREMENTS. 77. ALL FORMS AND COMPACTION SHALL BE INSPECTED PRIOR TO ANY CONCRETE POUR OR ASPHALT BEING PLACED. 78. ALL EXISTING PAVEMENT TO BE REMOVED SHALL BE SAW-CUT OR WHEEL-CUT AND REMOVED TO CLEAN STRAIGHT LINES WITH NO OVERCUT. 79. ALL CONCRETE CURB AND GUTTER FLOW LINES WITH LESS THAN 1% GRADE SHALL BE WATER TESTED PRIOR TO FINAL FINISHING TO ENSURE PROPER DRAINAGE WITHOUT UNACCEPTABLE HIGH OR LOW SPOTS. 80. AT ALL LOCATIONS WHERE NEW PAVEMENT JOINS EXISTING, THE EXISTING PAVEMENT SHALL BE COATED WITH AN ASPHALTIC EMULSION. 81. WHERE EXISTING PAVEMENT OR SUBGRADE IS FOUND TO BE UNSTABLE, THE CONTRACTOR SHALL REMOVE AND REPLACE A MINIMUM OF 1 FOOT OF SUBGRADE WITH CRUSHED MISCELLANEOUS BASE (CMB) AND COMPACT TO 95% OF MAXIMUM DRY DENSITY OBTAINABLE AS MEASURED BY ASTM D-1557. IF SHALLOW UTILITIES PREVENT REMOVAL OF SUBGRADE SOIL, A WOVEN GEOFABRIC SHALL BE USED TO PROVIDE STRENGTH TO THE SUBGRADE. 82. EXPANSION JOINTS PERPENDICULAR TO THE CURB SHALL BE INSTALLED IN COMBINED CURB AND GUTTER AT THE BCR, ECR, BC, EC, AND AT LOCATIONS WHERE THE CURB JOINS EXISTING STRUCTURES. LONGITUDINAL EXPANSION JOINTS SHALL BE INSTALLED WHERE THE CURB BUTTS AGAINST ANY EXISTING STRUCTURE. 83. THE EXACT LOCATIONS AND LIMITS FOR THE REMOVAL AND CONSTRUCTION OF SIDEWALKS AND CURB AND GUTTER SHALL BE DETERMINED IN THE FIELD BY THE ENGINEER. 84. PRIOR TO FINAL ACCEPTANCE OF STREET IMPROVEMENTS, ALL PAVEMENT, STRIPING, AND STENCILING WITHIN THE PROJECT AREA SHALL BE RESTORED TO LIKE NEW CONDITION TO THE SATISFACTION OF THE ENGINEER. PAVEMENT MARKING MATERIAL FOR TRAFFIC STRIPING ON PUBLIC ROADS SHALL CONFORM TO SECTIONS 210 AND 214 OF THE LATEST VERSION OF THE GREENBOOK. 85. ALL TRAFFIC MARKING AND STRIPING, UNLESS OTHERWISE NOTED, SHALL CONFORM TO THE LATEST EDITION OF THE CAMUTCD, THE GREENBOOK, AND CALTRANS STANDARD PLANS. 86. AT LEAST 72 HOURS SHALL ELAPSE FROM THE TIME CONCRETE IS PLACED BEFORE VEHICULAR TRAFFIC IS PERMITTED TO TRAVEL ON IT, UNLESS OTHERWISE APPROVED BY THE ENGINEER. 87. ALL UTILITY BOXES SHALL BE ADJUSTED TO THE NEW FINISHED GRADE. DAMAGED BOXES SHALL BE REPLACED. KEEP ALL UTILITY BOXES OUT OF DRAINAGE FLOW LINES, CURB RETURNS, DRIVEWAY APPROACHES, AND CURB RAMPS UNLESS APPROVED BY THE CITY ENGINEER. 88. ALL FILL SOILS OR SOILS DISTURBED OR OVER-EXCAVATED DURING CONSTRUCTION SHALL BE COMPACTED TO 95% MAXIMUM DENSITY AS DETERMINED BY ASTM SOIL COMPACTION TEST D-1557. 89. ALL PORTLAND CEMENT CONCRETE (PCC) AND ASPHALTIC CONCRETE (AC) SHALL BE REMOVED TO A SAWCUT, COLD JOINT, OR SCORE MARK. NO FLOATER SLABS LESS THAN THE MINIMUM INDICATED IN THE LATEST EDITION OF THE STANDARD PLANS FOR PUBLIC WORKS CONSTRUCTION 113-2, 132-4, 133-4, AND THE LATEST HERMOSA BEACH PUBLIC WORKS STANDARD PLANS 117. PCC AND AC REMOVALS SHALL BE SAWCUT A MINIMUM OF 1 INCH IN THE NECESSARY WORK AREA. SAWCUT SLURRY SHALL BE REMOVED WITH THE VACUUM MACHINE AND DISPOSED OF PROPERLY. NO SLURRY SHALL BE ALLOWED TO ENTER THE STORM DRAIN SYSTEM. 90. SHOULD ANY LINEAR OR AREA TRENCH JOINT BE LOCATED WITHIN 2 FEET (AC PAVEMENT) OR 3 FEET (PCC PAVEMENT) OF AN EXISTING PAVEMENT PATCH AND/OR CURB AND GUTTER ALIGNMENT, THE ADJACENT PAVEMENT SECTION/PATCH SHALL BE REMOVED AND REPAVED ALONG WITH THE TRENCH PAVEMENT RESTORATION. 91. ALL DAMAGED AND/OR REMOVED DRIVEWAY APPROACH, PCC SIDEWALK, OR CURB AND GUTTER SHALL BE RECONSTRUCTED TO GREENBOOK STANDARDS. 92. RAMP ASPHALT AT EXISTING DRIVEWAYS, GUTTERS, ETC. FOLLOWING MILLING OPERATIONS TO PROVIDE ACCESS IF PAVING IS NOT SCHEDULED FOR THE SAME DAY. 93. ALL EXCAVATIONS SHALL BE APPROPRIATELY SHORED AND PLATED OR BACKFILLED AT THE END OF EACH WORKING DAY AND ROADS OPENED TO VEHICULAR TRAFFIC UNLESS OTHERWISE APPROVED BY THE CITY ENGINEER. PLATES SHALL BE TACK WELDED, PINNED, AND/OR SECURED IN PLACE BY ANOTHER METHOD APPROVED BY THE INSPECTOR OR ENGINEER. 94. TRAFFIC PLATES ON EXCAVATED AREAS SHALL BE SKID RESISTANT, WITH MINIMUM COEFFICIENT OF FRICTION EQUIVALENT TO 0.35 PER CALIFORNIA TEST METHOD 342. STEEL PLATES BRIDGING SHALL BE STEEL OF MINIMUM A36 GRADE FOR HS20 TRUCK LOADING PER CALTRANS BRIDGE DESIGN SPECIFICATION MANUAL. 95. TRAFFIC STRIPING, MARKINGS, AND RAISED PAVEMENT MARKERS DAMAGED DURING CONSTRUCTION SHALL BE REINSTALLED IN KIND OR AS DIRECTED BY THE ENGINEER AND NOTED IN THE SPECIAL PROVISIONS. ALL NEW STRIPING AND MARKINGS SHALL BE THERMOPLASTIC UNLESS OTHERWISE NOTED AND APPROVED. FRONTIER JERRY RUIZ LOS ANGELES COUNTY FLOOD MAINTENANCE LOS ANGELES COUNTY PUBLIC WORKS RTI INFRASTRUCTURE CHRIS BRUNGARDT SOUTHERN CALIFORNIA EDISON & SCE TRANS TELECOM OR TERRENCE LITTLE SOUTHERN CALIFORNIA GAS MELISSA FUKUNAGA UNDERGROUND SERVICE ALERT DIAL 811 WEST BASIN MUNICIPAL WATER DISTRICT OR FRANK FUCHS CALIFORNIA WATER SERVICE ROBERT THOMPSON CHARTER COMMUNICATIONS BRAD BROULLIRE CITY OF HERMOSA BEACH PUBLIC WORKS CITY OF HERMOSA BEACH POLICE & FIRE DISPATCH CROWN CASTLE REBECCA CALDWELL LEGEND:SIGN POST WATER METER ELECTRIC POLE STREET LIGHT GAS VALVE SEWER CLEANOUT STORM DRAIN VAULT SEWER VAULT TRAFFIC SIGNAL BOX TRAFFIC SIGNAL POLE UTILITY VAULT UTILITY MANHOLE BASKETBALL HOOP UTILITY VALVE PARKING METER 1. TRAFFIC STRIPES, PAVEMENT LEGENDS, SIGNS AND RAISED PAVEMENT MARKERS PER LATEST EDITION OF CALIFORNIA M.U.T.C.D., CALTRANS STANDARD PLANS AND STANDARD SPECIFICATIONS. 2. ALL CONFLICTING LINES, LEGENDS, RAISED PAVEMENT MARKERS AND SIGNS SHALL BE REMOVED BY WET SANDBLASTING AND INCLUDES REMOVAL OF RAISED PAVEMENT MARKERS. 3. PAVEMENT DAMAGE DUE TO REMOVING RAISED PAVEMENT MARKERS SHALL BE REPAIRED TO THE SATISFACTION OF THE CITY ENGINEER. 4. STRIPING SHALL BE CAT TRACKED AND APPROVED BY THE CITY TRAFFIC ENGINEER PRIOR TO FINAL INSTALLATION MINIMUM OF ONE WEEK NOTICE REQUIRED BY THE CITY TRAFFIC ENGINEERS FOR APPROVAL OF STRIPING. 5. ALL STRIPING SHALL BE THERMOPLASTIC UNLESS OTHERWISE NOTED. 6. ALL LANE LINES AT INTERSECTION APPROACHES AND DEPARTURES SHALL BEGIN AND END WITH 50 FEET OF 6-INCH SOLID WHITE LANE WITH RAISED PAVEMENT MARKERS. 7. LANE WIDTH SHALL BE MEASURED BETWEEN THE CENTER LINES OF EACH ADJACENT SINGLE OR DOUBLE STRIPE OR BOTTOM OF CURB AS APPROPRIATE. 8. ALL SIGNS ARE TO BE REFLECTORIZED USING 3-M DIAMOND GRADE SHEETING (TYPE 11 WITH 1160A GRAFFITI OVERLAY). 9 . ALL SIGNS ARE TO BE STANDARD SIZE UNLESS OTHERWISE INDICATED AND PER STATE OF CALIFORNIA SIGN SPECIFICATIONS EXCEPT THAT ALL SIGNS SHALL BE MINIMUM 0.1 INCH THICK ALUMINUM SHEETING. 10. ALL SALVAGED SIGNS AND POSTS SHALL BE DELIVERED TO THE CITY MAINTENANCE YARD UNLESS OTHERWISE INDICATED. 11. ALL CURB MARKINGS (RED, BLUE, ETC.) SHALL BE REFRESHED WITHIN PROJECT LIMITS (2 COATS OF PAINT). 12. INSTALL BLUE RAISED REFLECTIVE PAVEMENT MARKERS IN FRONT OF THE HYDRANTS PER CA M.U.T.C.D. FIGURE 3B-102 (CA). 13. ALL ARROWS MARKINGS SHALL BE TYPE IV (L OR R) UNLESS OTHERWISE NOTED. 14. ALL NEW SIGN POSTS SHALL BE UNI-STRUT. 15. CONTINENTAL TYPE CROSSWALK, LONGITUDINAL BARS/LINES SHALL BE 2 FEET WIDE AND ALIGN WITH LANE LINES AND CENTER OF LANE.THE BARS SHALL BE THERMOPLASTIC AND PER CALTRANS REVISED STANDARD PLAN A24F. LONGITUDINAL BARS WHERE INDICATED SHALL BE PARALLEL TO THE DIRECTION OF VEHICLE TRAVEL. 16. ALL PEDESTRIAN WARNING SIGNS SHALL BE IN FLORESCENT YELLOW GREEN COLOR UNLESS OTHERWISE INDICATED. 17. USING 3M DIAMOND GRADE SHEETING (TYPE II WITH 1160A GRAFFITI OVERLAY). 18. ALL PAVEMENT MARKINGS SHALL BE ENNIS-FLINT BY PPG PREMARK OR APPROVED EQUAL. 19. STRIPING IS TO BE REPLACED IN KIND EXCEPT FOR THE ADDITION OF GREEN BACKGROUND FOR BIKE MARKINGS AND CONFLICT ZONES. TRASH CAN UTILITY BOX/VAULT FENCE BOLLARD WHEEL STOP BIKE RACK RAIL SEALMASTER SAFERIDE BRIGHT GREEN PAINT OR EQUAL (DOUBLE COAT) TRUNCATED DOME EV CHARGE STATION (310) 257-1400 (310) 257-1425 (310) 371-7469 (310) 318-0214 (310) 524-2750 (724) 416-9917 (909) 469-6343 (562) 861-0316 (626) 458-3109 (916) 949-9141 (909) 329-9445 (424) 319-8416 (310) 687-2026 (310) 687-2057 (800) 227-2600 (310) 660-6255 STRIPING GENERAL NOTES: PCC PLAIN CEMENT CONCRETE CMB CRUSHED MISCELLANEOUS ARHM ASPHALT-RUBBER HOT MIX AVE AVENUE BASE UTILITY COMPANIES: (310) 217-2411 TRAFFIC GENERAL NOTES: 1. ALL WORK AND MATERIAL SHALL COMPLY WITH THE 2014 CALIFORNIA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (CA MUTCD). 2. ALL STRIPING AND MARKINGS SHALL CONFORM TO THE STATE OF CALIFORNIA STANDARD PLANS AND SPECIFICATIONS. 3. THE CONTRACTOR SHALL PROVIDE FOR ACCESS TO ALL ADJACENT PROPERTIES. 4. FLASHING YELLOW BEACONS, TYPE-B, SHALL BE USED ON ALL W20-1 SIGNS AND ON ALL TYPE-III BARRICADES GUARDING THE WORK AREA OVERNIGHT. 5. ALL SIGNS SHALL BE REFLECTORIZED AND STANDARD SIZE. 6. ALL TUBULAR DELINEATORS SHALL BE 36” MINIMUM HEIGHT AND CONES SHALL BE 28” MINIMUM HEIGHT, REFLECTORIZED AND MAINTAINED ERECT IN THE INDICATED POSITION AT ALL TIMES, AND SHALL BE REPAIRED, REPLACED OR CLEANED AS NECESSARY TO PRESERVE THEIR APPEARANCE AND CONTINUITY AND SHALL INCLUDE A 12” HIGH-INTENSITY REFLECTORIZED SLEEVE, IF USED DURING NIGHT TIME HOURS. 7. THE CONTRACTOR SHALL MAINTAIN, ON A CONTINUOUS BASIS, ALL SIGNS, DELINEATORS, BARRICADES, ETC., TO INSURE PROPER FLOW AND SAFETY OF TRAFFIC DURING CONSTRUCTION. 8. THE CONTRACTOR SHALL HAVE ALL SIGNS, DELINEATORS, BARRICADES, ETC. PROPERLY INSTALLED PRIOR TO COMMENCING CONSTRUCTION. 9. THE CONTRACTOR SHALL COVER OR REMOVE ALL CONFLICTING SIGNS. 10. CONSTRUCTION OPERATIONS SHALL BE CONDUCTED IN SUCH A MANNER AS TO CAUSE AS LITTLE INCONVENIENCE AS POSSIBLE TO ABUTTING PROPERTY OWNERS. 11. ADDITIONAL TRAFFIC CONTROLS, TRAFFIC SIGNS OR BARRICADES MAY BE REQUIRED IN THE FIELD. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PLACEMENT OF ANY ADDITIONAL DEVICES NECESSARY TO ASSURE SAFETY THE PUBLIC AT ALL TIMES DURING CONSTRUCTION. 12. EXACT LOCATION AND TYPE OF CONSTRUCTION SIGNS SHALL BE DIRECTED THE CITY ENGINEER BASED UPON CONSTRUCTION CONDITIONS. 13. NO LANE CLOSURES ON ARTERIAL STREET WILL BE PERMITTED BETWEEN THE HOURS OF 7:00 AM AND 9:00 AM OR 3:00 PM AND 6:00 PM. 14. MOVE DELINEATORS AND/OR CONES TO THE EDGE LINE STRIPE DURING NON-WORKING HOURS. REMOVE BARRICADES ETC. FROM TRAVEL LANE. SEE NOTE 11. 15. REMOVE OR TURN SIGNS DURING NON-WORKING HOURS. 16. ALL CONFLICTING LINES, EXISTING CURB PAINT AND MARKINGS SHALL BE REMOVED BY WET SANDBLASTING OR OTHER APPROVED METHOD PRIOR TO INSTALLATION OF NEW/TEMPORARY STRIPING. ALL CONFLICTING RAISED PAVEMENT MARKERS SHALL BE REMOVED. PAVEMENT THAT IS DAMAGED DUE TO REMOVAL OF MARKINGS SHALL BE REPAIRED TO THE SATISFACTION OF THE CITY ENGINEER. THE CONTRACTOR SHALL IMPLEMENT BEST MANAGEMENT PRACTICES TO ENSURE NO RUN-OFF TO THE STORM DRAIN SYSTEM. 17. THE CONTRACTOR SHALL REPLACE ANY AND ALL STRIPING AND PAVEMENT MARKINGS DISRUPTED OR REMOVED DURING THIS CONSTRUCTION TO THE SATISFACTION OF THE CITY ENGINEER. 18. A MINIMUM OF 5 FEET CLEARANCE SHALL BE MAINTAINED BETWEEN ANY OPEN EXCAVATION AND ADJACENT TRAVEL LANES OPEN TO TRAFFIC. 19. THE CONTRACTOR SHALL PROVIDE FLAGGERS AS DEEMED NECESSARY BY THE CITY ENGINEER. FLAGGERS SHALL COMPLY WITH CHAPTER 6E “FLAGGER CONTROL” OF THE 2014 CA MUTCD. 20. THE CONTRACTOR SHALL COMPLY WITH THE REQUIREMENTS OF THE AMERICAN DISABILITY ACT (ADA) AS RELATED TO PEDESTRIAN ACCESS AND SHALL MAINTAIN PEDESTRIAN ACCESS AT ALL TIMES PER ADA REQUIREMENTS. SIDEWALK CLOSURE/DETOUR SHALL COMPLY WITH THE CALTRANS STANDARDS. 21. PLACE ADDITIONAL “LANE CLOSED” C30(CA) SIGNS ON TYPE-II BARRICADES AS DIRECTED BY THE CITY ENGINEER THROUGHOUT EXTENDED WORK AREAS IN EACH LANE THAT IS CLOSED. INSTALL “OPEN TRENCH” C27(CA) SIGNS WHENEVER AN OPEN EXCAVATION AREA EXISTS ADJACENT TO THE TRAVELED WAY. 22. THE CONTRACTOR SHALL POST SYMBOL “UNEVEN LANES”, “STEEL PLATES AHEAD” OR “BUMP” SIGNS FOR PAVEMENT SURFACE DISRUPTIONS OF ½ INCH OR GREATER. PAVEMENT DISRUPTIONS OF 1 INCH OR GREATER SHALL HAVE A BEVELED EDGE OF FOUR (4) HORIZONTAL TO ONE (1) VERTICAL. 23. THE CONTRACTOR SHALL INSTALL “CAUTION STEEL PLATES AHEAD” AND/OR “ROUGH ROAD” SIGNS IN ADVANCE OF STEEL PLATE BRIDGING. 24. THE CONTRACTOR SHALL NOTIFY MTA AND TORRANCE TRANSIT OR ANY OTHER AFFECTED TRANSIT SERVICES AT LEAST TEN WORKING DAYS PRIOR TO CONSTRUCTION REGARDING ANY AFFECTED LOCATIONS. 25. THE CONTRACTOR SHALL NOTIFY AFFECTED SCHOOLS, BUSINESSES, HOME OWNERS, POLICE AND FIRE DEPARTMENTS ONE (1) WEEK PRIOR TO START OF WORK. 26. PROVIDE THE CONTRACTOR'S 24 HOUR CONTACT AND TELEPHONE NUMBER FOR RESPONSE TO TRAFFIC CONTROL ISSUES. 27. THE CONTRACTOR SHALL CONTACT, A MINIMUM OF FIVE (5) BUSINESS DAYS IN ADVANCE, THE CITY'S TRAFFIC SIGNAL ENGINEER TO ASSURE IMPLEMENTATION OF PROPER TIMING OF AFFECTED TRAFFIC SIGNALS. THE PROPER TRAFFIC SIGNAL TIMING SHALL BE IN EFFECT AT ALL TIMES THAT THE ASSOCIATED TRAFFIC CONTROLS ARE IN PLACE. 2" ARHM OVERLAY TREE R/C RED CURB PAVERS REPAIR AREA 12/11/24 12/11/24 Page 656 of 1852 N.T.S. EXIST. C&G WHEN OCCURS EXIST. C&G WHEN OCCURS 3 8" LIP EXIST. PAVEMENT SECTION TYPICAL GRIND AND OVERLAY CROSS SECTION 2" DEEP 2" DEEP 4 TACK COAT EXIST. BULB OUT WHEN OCCURS EXIST. BULB OUT WHEN OCCURS 3 8" LIP 3 8" LIP (TYP.) EXIST. PAVEMENT SECTION 2" DEEP 2" DEEP N.T.S. PIER AVE TYPICAL GRIND AND OVERLAY CROSS SECTION AT BULB OUT 5 EXIST. MEDIAN WHEN OCCURS 2" GRIND AND ARHM OVERLAY N.T.S. EXIST. C&G WHEN OCCURS EXIST. C&G WHEN OCCURS 3 8" LIP 3 8" LIP (TYP.) EXIST. PAVEMENT SECTION 65' to 72' PIER AVE TYPICAL GRIND AND OVERLAY CROSS SECTION 2" DEEP 2" DEEP 6 VARIES PROPERTY LINE PROPERTY LINE VARIES PIER AVE FROM PACIFIC COAST HWY TO ARDMORE AVE PIER AVE FROM ARDMORE AVE TO MANHATTAN AVE PIER AVE FROM MANHATTAN AVE TO HERMOSA AVE TACK COAT 2" GRIND AND ARHM OVERLAY 2" GRIND AND ARHM OVERLAY 2" GRIND AND ARHM OVERLAY TACK COAT TACK COAT 3 8" LIP (TYP.) 28' to 40' 5' to 10' 28' to 40' 74' +/- VARIES N.T.S. TYPICAL LOCAL STREET RECONSTRUCTION TACK COAT (TYP.) COMPACT EXIST. SUBGRADE TO 90% DENSITY (TYP.) 3 2" ARHM-GG-C COURSE 4" AC TYPE B-PG 64-10 BASE COURSE COMPACT EX. BASE TO BE 95% DENSITY (TYP) WHEN OCCURS N.T.S. COMPACT EXIST. SUBGRADE TO 90% DENSITY (TYP.) CONSTRUCT 8" PCC PAVEMENT,
5,000PSI(3,000 PSI @ 3 DAYS) 1 TYPICAL PCC RECONSTRUCTION SECTION 8" CMB AND COMPACTED TO 95% TACK COAT (TYP.) N.T.S. 2 TYPICAL STREET OVERLAY SECTION 2" GRIND AND 2" ARHM-GG-C COURSE EXISTING AC PAVEMENT SECTION 9" 9" #5 DOUBLE BAR WITH EPOXY BOND 18" O.C. EX. PCC PAVEMENT 3" DEEP CONTRACTION JOINT SAWCUT PER CALTRANS STD. P15, 15' O.C. MAX N.T.S. DECORATIVE SIDEWALK PAVING 7 FILTER FABRIC BEDDING COURSE 1 12" THICK NO. 8 AGGREGATE COBBLE PAVERS MATCH TO EXISTING CONCRETE PAVING OR EXISTING CURB PER PLAN 4" THICK, NO.57 STONE OPEN-GRADED BASE 6" THICK NO.2 STONE SUBBASE SOIL SUBGRADE, ZERO SLOPE NOTE: TREAT TOP OF EXISTING SUBGRADE AND/OR BACKFILL WITH PRE-EMERGENT HERBICIDE. 2' DIAMETER HOLLOW STEEL POST N.T.S. PARKING METER POST 8 36"
18"
12/11/24 12/11/24

Page 657 of 1852 ends

10+00
11+00
12+00
13+00
14+00
15+00
16+00
17+00 18+00 19+00
20+00
21+00
22+00
23+00
24+00
72'
29'
37' 69'
22'
37'
39'
28'
56' 61'
72'
37'
35'
21' 24+00 25+00 26+00 27+00 29+00 30+00 31+00 32+00 33+00 34+00 28+00
10+00 11+00
69'
30'
37'
30'
36'
34'
29' SCALE: 1"=40'
BARD ST.

VALLEY DR.

ARDMORE AVE.

CYPRESS AVE.

LOMA DR. SUNSET DR.

LOMA DR.

MONTEREY
DR.

MANHATTAN
AVE. PALM
DR.

BLVD.

BAYVIEW

PACIFIC COAST HWY C I T Y O F

H E R M O S A
B
E A C H , C A 1 9 0 7 N PAVEMENT LEGEND 2" COLD MILL AND 2" ARHM OVERLAY REMOVE AND REPLACE PAVEMENT (AC+BASE) COLD MILL 2" DEPTH, INCLUDES REMOVAL OF EXISTING FABRIC, APPLY TACKCOAT AND CONSTRUCT 2" ARHM OVERLAY PER SHEET ST-1, DETAIL 2.

REMOVE EXISTING AC PAVEMENT SECTION TO 6" DEEP, LENGTH AND WIDTH PER PLAN, RECONSTRUCT REMOVED AC PAVEMENT SECTION WITH 2" ARHM OVER 4" B-MIX BASE COURSE PER SHEET ST-1, DETAIL 3. ADJUST MANHOLE FRAME AND COVER TO GRADE AS REQUIRED. ADJUST EXISTING UTILITY VALVE TO GRADE AS REQUIRED. CONSTRUCTION NOTES: C I T Y

O F H E R M O S A
B E A C H , C A 1 9 0 7 N PROTECT IN PLACE. REMOVE AND RECONSTRUCT ADA RAMP INCLUDING DETECTABLE WARNING SURFACE PER SPPWC STD PLAN 111-5, CASE AND TYPE AS NOTED. REMOVE EX. CURB AND CONSTRUCT 8" PCC CURB AND GUTTER PER SPPWC STD. 120-3. REMOVE AND RECONSTRUCT 4" PCC SIDEWALK OVER 4" CMB. REMOVE AND RECONSTRUCT PCC DRIVEWAY PER CALTRANS STD. A87A WITH 6" CMB. REMOVE, SALVAGE, AND REINSTALL SIGNS. CONCRETE REPAIR AREA REMOVE, SALVAGE, AND REINSTALL INSTALL BIKE RACK (TYP). INSTALL VANGUARD LIQUID APPLIED DETECTABLE WARNING SURFACES OR APPROVED EQUAL. REMOVE EXISTING WHEEL STOP AND INSTALL NEW WHEEL STOP (TYP). REMOVE, SALVAGE, AND REINSTALL TRASH CAN. SAWCUT, REMOVE AND REPLACE 8" PCC PAVEMENT OVER 8" CMB PER SHEET ST-1, DETAIL 1. GENERAL NOTES: 1. THE CONTRACTOR SHALL PLACE THE BASE COURSE RIGHT AFTER THE EXCAVATION FOR THE LOCAL STREET REPAIR. 2. DOWEL BARS SHALL BE INSTALLED AFTER FIRST HALF OF CONCRETE PAVEMENT BETWEEN SLABS. 3. PIER AVE FROM VALLEY DR TO PACIFIC COAST HWY MAY HAVE EX. CONCRETE UNDER EX. ASPHALT. 4. CONTRACTOR SHALL PROVIDE THE CONSTRUCTION SURVEY FOR THE 4' WIDE PCC CROSS GUTTER. THE GRADE SHALL BE A STRAIGHT SLOPE FROM THE UPSTREAM TO THE DOWNSTREAM POINTS PER THE ENGINEER'S DIRECTION. REMOVE EX. CURB AND CONSTRUCT 8" PCC CURB PER SPPWC STD. 120-3. INSTALL 2' X 6' REDWOOD HEADER BOARD BETWEEN THE GREENBELT AND AC PAVING AREA. CASE A, TYPE 1 MATCH DISTURBED AREA WITH SAME TYPE OF EX. BRICK PAVER. SALVAGE THE PARKING METER. HERMOSA AVE PIER AVE PIER AVE REMOVE EXISTING PAVERS AND INSTALL NEW PAVERS PER SHEET ST-1, DETAIL 7. PAVERS REPAIR AREA REMOVE AND EXCAVATE EX. CURB AND GUTTER AND AC PAVEMENT AND CONSTRUCT 4" WIDE PCC CROSS GUTTERS PER SPPWC STD. 122-3. 12/11/24 12/11/24 Page 658 of 1852 7'
29'
27+0028+00 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 30' 20' 8TH STREET
6TH STREET
12'
12' 12'
29'
7' 35' 23+00 24+00 25+00 26+00
27+00 28+00 29+00
30+00
31+00
32+00
33+00
34+00
35+00
24'
223 201 203 205 207 209 211
12'
12' 30' 35+00 36+00 37+00 38+00 40+00 41+00 42+00 43+00 44+00 45+00
39+00
24'
22' 1 12'
12' 46+00 47+00 48+00 49+00
50+00
22'
20'
30' 4' MIN. 4' MIN. 5' 2' 8' 20' 15' SCALE: 1"=40' VALLEY DRIVE VALLEY DRIVE VALLEY DRIVE VALLEY DRIVE 11TH ST
8TH ST
6TH ST
2ND ST
ST
HERONDO PAVEMENT LEGEND 2" COLD MILL AND 2" ARHM OVERLAY REMOVE AND REPLACE PAVEMENT (AC+BASE)

T I C Y
O F

H E R M
O S A
B E A C H , C A 1 9 0 7 N

Y T I C O F

H E R M
O
S A
B E A C H , C A 1 9 0 7 N

C O Y T I F
H E
R

M O S A
B E A C H , C A 1 9 0 7 N Y T I C O F H E R M O S A B E A C H , C A 1 9 0 7 N STA 17+98.32
STA 25+20.86
STA 26+79.58
STA 27+14.36
STA 17+15.85
STA 17+98.32 CONSTRUCTION NOTES: CONCRETE REPAIR AREA CASE B, TYPE 2 CASE B, TYPE 2 CASE A, TYPE 1 COLD MILL 2" DEPTH, INCLUDES REMOVAL OF EXISTING FABRIC, APPLY TACK COAT AND CONSTRUCT 2" ARHM OVERLAY PER SHEET ST-1, DETAIL 2. REMOVE EXISTING AC PAVEMENT SECTION TO 6" DEEP, LENGTH AND WIDTH PER PLAN, RECONSTRUCT REMOVED AC PAVEMENT SECTION WITH 2" ARHM OVER 4" B-MIX BASE COURSE PER SHEET ST-1, DETAIL 3. ADJUST MANHOLE FRAME AND COVER TO GRADE AS REQUIRED. ADJUST UTILITY COVER TO GRADE AS REQUIRED. PROTECT IN PLACE. REMOVE AND RECONSTRUCT ADA RAMP INCLUDING DETECTABLE WARNING SURFACE PER SPPWC STD PLAN 111-5, CASE AND TYPE AS NOTED. REMOVE EX. CURB AND CONSTRUCT 8" PCC CURB AND GUTTER PER SPPWC STD. 120-3. REMOVE AND RECONSTRUCT 4" PCC SIDEWALK OVER 4" CMB. REMOVE AND RECONSTRUCT PCC DRIVEWAY PER CALTRANS STD. A87A WITH 6" CMB. REMOVE, SALVAGE, AND REINSTALL SIGNS. SAWCUT, REMOVE AND REPLACE 8" PCC PAVEMENT OVER 8" CMB PER SHEET ST-1, DETAIL 1. REMOVE ~79 EXISTING WHEEL STOP (TYP).

REMOVE, SALVAGE, AND REINSTALL INSTALL BIKE RACK (TYP). INSTALL VANGUARD LIQUID APPLIED DETECTABLE WARNING SURFACES OR APPROVED EQUAL. GRATE STA 22+94.62 REMOVE, SALVAGE, AND REINSTALL TRASH CAN. TRUNCATED DOME GRATE GENERAL NOTES: 1. THE CONTRACTOR SHALL PLACE THE BASE COURSE RIGHT AFTER THE EXCAVATION FOR THE LOCAL STREET REPAIR. 2. THERE IS NO FIELD SURVEY INFORMATION. CONTRACTOR SHALL PROVIDE FIELD CONSTRUCTION SURVEY AND MATCH EXISTING FLOW LINE AND ELEVATION. 3. DOWEL BARS SHALL BE INSTALLED AFTER FIRST HALF OF CONCRETE PAVEMENT BETWEEN SLABS. CASE B, TYPE 2 TYP. TYP.

STA 18+58.48
STA 18+81.48
STA 20+13.28
STA 20+33.28
STA 20+60.61
STA 20+90.60 TYP. SEE DETAIL A CASE A, TYPE 1
CASE B, TYPE 2 STREET LIGHT AND FOUNDATION FLOW CURVE INFORMATION L=8' R=6.17 A=70° FLOW
FLOW DETAIL A: SCALE: 1"=10' REMOVE EX. CURB AND CONSTRUCT 8" PCC CURB PER SPPWC STD. 120-3. NOTE: THE CONTRACTOR SHALL PROVIDE THE FIELD SURVEY FOR THE CONSTRUCTION OF PASSAGEWAY ISLAND. THE FLOW LINE SHALL BE CONSTRUCTED AT THE SAME GRADE AND LOCATION AS ORIGINAL LAYOUT. NOTE:THE CONTRACTOR SHALL COORDINATE WITH THE PROPERTY HOA/OWNER TO SHUT OFF IRRIGATION SYSTEM AND CARRY OUT THE NECESSARY REPAIRS.

PIER AVE INSTALL 2' X 6' REDWOOD HEADER BOARD BETWEEN THE GREENBELT AND AC PAVING AREA. CASE B, TYPE 2 STA 13+53.10
STA 11+75.46
STA 50+57.58 STA 50+29.16 STA 50+06.09
12/11/24 12/11/24

Page 659 of 1852 ends

21' 83' 10+00 11+00 12+00 13+00 14+00 15+00 40' 35' 34' 10' 120' 10+00 11+00 12+00 13+00 14+00 15+00 16+00
23'
31'
25'
11+00 12+00 13+00 14+00 15+00 16+00
10+00 11+00 12+00 13+00 14+00 15+00 10+00 10+00 21' 24' 19' 7' 7' 11' 10+00 13+00 14+00 11+00 12+00 10+00
10+00
15+00 10+00 11+00 12+00 13+00 14+00 15+00 16+00
17+00 24' 19' SCALE: 1"=40' PAVEMENT LEGEND 2" COLD MILL AND 2" ARHM OVERLAY REMOVE AND REPLACE PAVEMENT (AC+BASE) POWER ST 20TH ST
21ST ST 24TH ST
VALLEY DR 15TH ST

OCEAN DR
PACIFIC COAST HWY 15TH PL PROSPECT AVE 11TH PL HARPER AVE 14TH ST

CORONA ST

OWOSSO AVE

BONNIE BRAE ST
OCEAN

PROSPECT AVE
PACIFIC COAST HWY16TH ST C I T Y
O F

H E R M O S A
B
E A C H , C 1 A 9 0 7 N

Y T I C
O F

H E R M
O
S A
B E A C H , C A 1 9 0 7 N

C I T Y O F

H E R M O S A
B
E A C H , C A 1 9 0 7 N

C I T Y O F

H E R M O S A
B E A C H , C A 1 9 0 7 N

C I T Y O F

H E R M O S A
B E A C H , C A 1 9 0 7 N
STA 14+60.96
STA 14+71.94
STA 11+76.11
STA 11+86.05
STA 11+72.16
STA 12+55.20
STA 15+18.06
STA 16+37.99
STA 11+95.82.

STA 12+16.09
STA 13+36.14
STA 13+49.72
STA 12+26.48
STA 12+48.95
STA 13+43.05
STA 14+48.03
STA 14+65.16
STA 14+93.09
STA 14+99.07
STA 12+80.41
STA 12+86.47 CONSTRUCTION NOTES: CONCRETE REPAIR AREA GTE MCG CASE B, TYPE 2 CASE B, TYPE 2? CASE B, TYPE 2 CASE D, TYPE 1 CASE B, TYPE 2
CASE D, TYPE 2
CASE D, TYPE 2 CASE A, TYPE 4
CASE A, TYPE 4 CASE D, TYPE 2
COLD MILL 2" DEPTH, INCLUDES REMOVAL OF EXISTING FABRIC, APPLY TACKCOAT AND CONSTRUCT 2" ARHM OVERLAY PER SHEET ST-1, DETAIL 2.

REMOVE EXISTING AC PAVEMENT SECTION TO 6" DEEP, LENGTH AND WIDTH PER PLAN, RECONSTRUCT REMOVED AC PAVEMENT SECTION WITH 2" ARHM OVER 4" B-MIX BASE COURSE PER SHEET ST-1, DETAIL 3. ADJUST MANHOLE FRAME AND COVER TO GRADE AS REQUIRED. ADJUST UTILITY COVER TO GRADE AS REQUIRED. PROTECT IN PLACE. REMOVE AND RECONSTRUCT ADA RAMP INCLUDING DETECTABLE WARNING SURFACE PER SPPWC STD PLAN 111-5, CASE AND TYPE AS NOTED. REMOVE EX. CURB AND CONSTRUCT 8" PCC CURB AND GUTTER PER SPPWC STD. 120-3. REMOVE AND RECONSTRUCT 4" PCC SIDEWALK OVER 4" CMB. REMOVE AND RECONSTRUCT PCC DRIVEWAY PER CALTRANS STD. A87A WITH 6" CMB. REMOVE, SALVAGE, AND REINSTALL SIGNS. SAWCUT, REMOVE AND REPLACE 8" PCC PAVEMENT OVER 8" CMB PER SHEET ST-1, DETAIL 1. REMOVE EXISTING WHEEL STOP AND INSTALL NEW WHEEL STOP (TYP).

REMOVE, SALVAGE, AND REINSTALL INSTALL BIKE RACK (TYP).

STA 13+39.34
STA 13+82.64
STA 14+23.27
STA 14+64.64
STA 15+56.82
STA 15+85.55
STA 12+13.04
STA 14+21.22
STA 13+38.36
STA 16+83.11
STA 16+41.24 INSTALL VANGUARD LIQUID APPLIED DETECTABLE WARNING SURFACES OR APPROVED EQUAL. REMOVE, SALVAGE, AND REINSTALL TRASH CAN. 14TH ST STA 14+58.53 GENERAL NOTES: 1. THE CONTRACTOR SHALL PLACE THE BASE COURSE RIGHT AFTER THE EXCAVATION FOR THE LOCAL STREET REPAIR. 2. THE LOCATION OF THE SECOND TREE, BRISBANE BOX IN 24 INCH SHALL BE DIRECTED BY THE ENGINEER. 3. DOWEL BARS SHALL BE INSTALLED AFTER FIRST HALF OF CONCRETE PAVEMENT BETWEEN SLABS. REMOVE EX. CURB AND CONSTRUCT 8" PCC CURB PER SPPWC STD. 120-3. INSTALL 2' X 6' REDWOOD HEADER BOARD BETWEEN THE GREENBELT AND AC PAVING AREA. 2" ARHM OVERLAY REMOVE TREE. FURNISH AND INSTALL TREE, BRISBANE BOX IN 24 INCH BOX.

DR
12/11/24 12/11/24

Page 660 of 1852 ends

20'
10+00
11+00
12+00 10+00 11+00
10+00 10+00 11+00 12+00
15' 19'
10+00
11+00 10+00 11+00 10+00 11+00 13+00 14+00 15+00 16+00 12+00 11+00 10+00 623
651
653 861 10+00 11+00 12+00 13+00 14+00 15+00
10' 10+00 11+00 12+00
12'
16' 10+00 11+00 10+00 11+00 SCALE: 1"=40' 20TH ST 20TH ST 21ST ST

RHODES ST
RHODES ST 32ND PL 31ST ST MORNINGSIDE DR
29TH CT
28TH ST
29TH ST
30TH PL
9TH ST

PACIFIC COAST HWY

ARDMORE AVE

VALLEY DR

VALLEY DR

INGLESIDE DR

INGLESIDE DR
31ST PL PAVEMENT LEGEND 2" COLD MILL AND 2" ARHM OVERLAY REMOVE AND REPLACE PAVEMENT (AC+BASE) CONCRETE REPAIR AREA C I T Y O F H E R M O S A B E A C H , C A 1 9 0 7 N C I T Y O F H E R M O S A B E A C H , C A 1 9 0 7 N C I T Y O F H E R M O S A B E A C H , C A 1 9 0 7 N C I T Y O F H E R M O S A B E A C H , C A 1 9 0 7 O Y T I C N F H E R M O S A B E A C H , C A 1 9 0 N7 I C T Y O F H E R M O S A B E A C H , C A 1 9 0 N7 30TH ST
LONGFELLOW AVE ALLEY 30TH ST

TENNYSON PL

C I T Y O
F

H E R M O S A B E A
C
H , C A 1 9 0 N7

C T I O Y F
H E
R
M O S A B E A C H , C A 1 9 0 7 N
31ST ST
30TH ST ALLEY
ALLEY
STA 10+27.00
STA 10+75.96
CASE B, TYPE 2
CASE B, TYPE 2 CONSTRUCTION NOTES: COLD MILL 2" DEPTH, INCLUDES REMOVAL OF EXISTING FABRIC, APPLY TACK COAT AND CONSTRUCT 2" ARHM OVERLAY PER SHEET ST-1, DETAIL 2. REMOVE EXISTING AC PAVEMENT SECTION TO 6" DEEP, LENGTH AND WIDTH PER PLAN, RECONSTRUCT REMOVED AC PAVEMENT SECTION WITH 2" ARHM OVER 4" B-MIX BASE COURSE PER SHEET ST-1, DETAIL 3. ADJUST MANHOLE FRAME AND COVER TO GRADE AS REQUIRED. ADJUST UTILITY COVER TO GRADE AS REQUIRED. PROTECT IN PLACE. REMOVE AND RECONSTRUCT ADA RAMP INCLUDING DETECTABLE WARNING SURFACE PER SPPWC STD PLAN 111-5, CASE AND TYPE AS NOTED. REMOVE EX. CURB AND CONSTRUCT 8" PCC CURB AND GUTTER PER SPPWC STD. 120-3. REMOVE AND RECONSTRUCT 4" PCC SIDEWALK OVER 4" CMB. REMOVE AND RECONSTRUCT PCC DRIVEWAY PER CALTRANS STD. A87A WITH 6" CMB. REMOVE, SALVAGE, AND REINSTALL SIGNS. SAWCUT, REMOVE AND REPLACE 8" PCC PAVEMENT OVER 8" CMB PER SHEET ST-1, DETAIL 1. REMOVE EXISTING WHEEL STOP AND INSTALL NEW WHEEL STOP (TYP). REMOVE, SALVAGE, AND REINSTALL INSTALL BIKE RACK (TYP).

STA 10+91.14
STA 11+00.12
STA 11+78.08
STA 12+03.52
STA 13+46.32
STA 13+86.89
STA 15+53.97
STA 15+92.02
STA 15+87.94
STA 15+91.93
STA 10+16.54
STA 11+55.91
STA 11+90.20
STA 11+46.10
STA 11+79.11
STA 11+68.56
STA 11+72.21
STA 10+93.19 STA 11+95 INSTALL VANGUARD LIQUID APPLIED DETECTABLE WARNING SURFACES OR APPROVED EQUAL. REMOVE, SALVAGE, AND REINSTALL TRASH CAN. GENERAL NOTES: 1. THE CONTRACTOR SHALL PLACE THE BASE COURSE RIGHT AFTER THE EXCAVATION FOR THE LOCAL STREET REPAIR. 2. DOWEL BARS SHALL BE INSTALLED AFTER FIRST HALF OF CONCRETE PAVEMENT BETWEEN SLABS.

STA 14+47.31
STA 14+67.91
STA 15+36.41
STA 15+52.65
STA 15+49.24
STA 15+72.12 REMOVE EX. CURB AND CONSTRUCT 8" PCC CURB PER SPPWC STD. 120-3.

STA 10+16.54
STA 10+64.80 INSTALL 2' X 6' REDWOOD HEADER BOARD BETWEEN THE GREENBELT AND AC PAVING AREA. C I T Y O F O MR E H S A B E A C H , C A 1 9 0 7 N 28TH ST

INGLESIDE DR
441 28TH ST GRATE
STA 11+54.60
STA 11+69.16
CASE A, TYPE 1
12/11/24 12/11/24

Page 661 of 1852 ends

18' 9' 5'
10' 8'
5' SCALE: 1"=40'
11TH ST CYPRESS AVE PAVEMENT LEGEND 2" COLD MILL AND 2" ARHM OVERLAY CONCRETE REPAIR AREA T I C Y

O F H E R

M O S A
B E A C H , C A 1 9 0 N7 STRIPING CONSTRUCTION NOTES: RESTRIPE EXSITING 4" SOLID WHITE STRIPING IN LIKE KIND. CONSTRUCTION NOTES: COLD MILL 2" DEPTH, INCLUDES REMOVAL OF EXISTING FABRIC, APPLY TACK COAT AND CONSTRUCT 2" ARHM OVERLAY PER SHEET ST-1, DETAIL 2. REMOVE EXISTING AC PAVEMENT SECTION TO 6" DEEP, LENGTH AND WIDTH PER PLAN, RECONSTRUCT REMOVED AC PAVEMENT SECTION WITH 2" ARHM OVER 4" B-MIX BASE COURSE PER SHEET ST-1, DETAIL 3. ADJUST MANHOLE FRAME AND COVER TO GRADE IF NEED. ADJUST UTILITY COVER TO GRADE IF NEED. PROTECT IN PLACE. REMOVE AND RECONSTRUCT ADA RAMP INCLUDING DETECTABLE WARNING SURFACE PER SPPWC STD PLAN 111-5, CASE AND TYPE PER PLAN. REMOVE EX. CURB AND CONSTRUCT 8" PCC CURB AND GUTTER PER SPPWC STD. 120-3. REMOVE AND RECONSTRUCT 4" PCC SIDEWALK OVER 4" CMB. REMOVE AND RECONSTRUCT PCC DRIVEWAY PER CALTRANS STD. A87A WITH 6" CMB. REMOVE, SALVAGE, AND REINSTALL SIGNS. SAWCUT, REMOVE AND REPLACE 8" PCC PAVEMENT OVER 8" CMB PER SHEET ST-1, DETAIL 1. REMOVE EXISTING WHEEL STOP AND INSTALL NEW WHEEL STOP (TYP). REMOVE, SALVAGE, AND REINSTALL BIKE RACK (TYP). INSTALL VANGUARD LIQUID APPLIED DETECTABLE WARNING SURFACES OR APPROVED EQUAL. INSTALL SOLID 4" WHITE LINE AT 5' O.C. (WIDE ACCESS AISLE). REMOVE, SALVAGE, AND REINSTALL TRASH CAN. INSTALL BLUE INTERNATIONAL SYMBOL OF ACCESSIBILITY MARKING PER CALTRANS STD PLAN A24C. GENERAL NOTES: 1. THE CONTRACTOR SHALL PLACE THE BASE COURSE RIGHT AFTER THE EXCAVATION FOR THE LOCAL STREET REPAIR. 2. DOWEL BARS SHALL BE INSTALLED AFTER FIRST HALF OF CONCRETE PAVEMENT BETWEEN SLABS. REMOVE EX. CURB AND CONSTRUCT 8" PCC CURB PER SPPWC STD. 120-3. CLARK FIELD 961 VALLEY DR 12/11/24 12/11/24 Page 662 of 1852 13'
20'
15'
20'
17'
17'
26' 17'
18'
17 6 17' 5' 8' 5'
19'
17'
17'
17'
10'
12' 17.5'
13'
5'
12'
17'
12'
5' 5' 8'
6'
12'
5' 5'
12'
5'
6'
12'
5' 5' 12'
5' 8' 12' 6' 12' 5' 5' 5' 12' 6' 12' 5' 5'
8'
5' 5'
12'
5'
8'
6'
12'
5'
5' 8' 12' 5' 5' 8' 5' 12' 12' 5' 5'
17'
16'
17'
21'
18'
26'
19'
5'
5' 5'
5' 5'
19' 5' 22' 20' 21' 19' 18' 21' 21' 22' 20' 20' 5' 21'18' 26'18' 20'
14'
10+00
11+00
12+00
13+00
14+00
15+00
16+00
17+00 18+00 19+00
20+00
21+00
22+00
23+00
24+00
19' 19'
21'
15'
20'
20'
20'
20'
15'
20'
21'
21'
21'
21' 21'
21'
20' 20'
8'
12'
15' 85'
17'
19' 8' 12' 10' 10' 10' 12'
16' 8' 10' 11' 12'
12' 10' 12'
5' 10' 10' 8'
11' 10' 10' 11' 10' 8' 8' 10' 12' 8' 10'
12'
15'
13' 4' 10'
12'
12'
12' 11' 19' 22'
22'(TYP). 85'
10' 50' 15'
15'
11'
10' 8' 10' 17.5' 22' 19' 19' 18' 18' 19' 19' 22' 22' 22' 26' 24' 19' 22' 20' 19' 5' 22' 18' 24+00 25+00 26+00 27+00 29+00 30+00 31+00 32+00 33+00 34+00 28+00
10+00 11+00 22' 18' 8.5' 15'
2' 2'
2' 2' 2' END SPACE VARIES BETWEEN 18'-22' CENTER SPACE VARIES BETWEEN 18'-26' 2' 2' 2'
2' 2' END SPACE VARIES BETWEEN 18'-22' CURB
8' DETAIL "B" TYPICAL PARKING "T" MEASUREMENTS (NOT TO SCALE) 2'
2'
2'
2' SCALE: 1"=40'
BARD ST.

VALLEY DR.

ARDMORE AVE.

CYPRESS AVE.

LOMA DR. SUNSET DR.

LOMA DR.

MONTEREY
DR.

MANHATTAN
AVE. PALM
DR.

BLVD.

BAYVIEW

PIER AVE
PACIFIC COAST HWY PIER AVE REMOVE PAVEMENT MARKING AND INSTALL EV CHARGING PARKING SPACE MARKER PER CITY'S APPROVAL. "HERE" TYP. "STOP" TYP. "WAIT" TYP. "CLEAR" TYP. "KEEP" TYP. YELLOW "STOP" TYP. "ONLY" TYP. YELLOW YELLOW YELLOW C I T Y O F H E R M O S A B E A C H , C A 1 9 0 7 N C I T Y O F H E R M O S A B E A C H , C A 1 9 0 7 N INSTALL WHITE (UNLESS SPECIFIED OTHERWISE) CONTINENTAL TYPE CROSSWALK ALIGN 2' WIDE STRIPES WITH LANE LANE. INSTALL BROKEN BIKE LANE LINE PER CALTRANS STD. PLAN A20D, DETAIL 39A. INSTALL TYPE IV ARROWS AS SHOWN (TYP). INSTALL TYPE I 10'-0" ARROW AS SHOWN (TYP). STRIPING CONSTRUCTION NOTES: INSTALL SOLID BIKE LANE LINE PER CALTRANS STD. PLAN A20D, DETAIL 39. INSTALL DOUBLE YELLOW LINE PER CALTRANS STD. PLAN A20A, DETAIL 21. INSTALL YIELD LINE PER CALTRANS STD. PLAN A24G. INSTALL PAVEMENT MARKING AS SHOWN PER CALTRANS STD. PLAN A24D & A24E. INSTALL 6" WHITE LANE LINE PER CALTRANS STD. PLAN A20A, DETAIL 8. INSTALL SHARED ROADWAY BICYCLE MARKING PER CALTRANS STD. PLAN A24C. INSTALL BIKE LANE SYMBOL WITH PERSON MARKING AND BIKE ARROW PER CALTRANS STD PLAN A24C AND A24A. INSTALL 2 SETS OF DOUBLE YELLOW LINE WITH MARKERS PER CALTRANS STD. PLAN A20B, DETAIL 29. INSTALL "L" AND "T" PARKING AS SHOWN (TYP), SEE DETAIL B ON SHEET ST-1. INSTALL 4" SOLID WHITE PARKING LINE (TYP). INSTALL BLUE INTERNATIONAL SYMBOL OF ACCESSIBILITY MARKING PER CALTRANS STD PLAN A24C. INSTALL SOLID 4" BLUE LINE AT 5' O.C. (ACCESS AISLE). INSTALL TWO-WAY LEFT TURN LANE WITH MARKERS PER CALTRANS STD. A20B, DETAIL 31. INSTALL 12" LIMIT LINE PER CALTRANS STD. PLAN A24G. INSTALL 6" YELLOW LINE. REMOVE CONFLICTING STRIPE AND MARKINGS BY WET SANDBLASTING. INSTALL 6" WHITE LANE LINE WITH MARKERS PER CALTRANS STD. PLAN A20A, DETAIL 9. 50' 25' 50' 50' 50' 70' INSTALL SOLID 4" WHITE LINE AT 5' O.C. (ACCESS AISLE). 130' 100' INSTALL 2 SETS OF DOUBLE YELLOW LINE WITH MARKERS PER CALTRANS STD. PLAN A20B, DETAIL 28. INSTALL TRAFFIC LOOPS AS INDICATED ON PLANS. SPLICE NEW LOOP WIRES TO EXISTING DLC AT THE NEAREST DLC PULL BOX (TYP). 10' O.C. INSTALL "CITY VEHICLE PARKING" MARKER PER CITY'S APPROVAL (TYP). INSTALL 6" YELLOW CENTERLINE WITH MARKERS PER CALTRANS STD. PLAN A20A, DETAIL 2. INSTALL 6" YELLOW CENTERLINE PER CALTRANS STD. PLAN A20A, DETAIL 1. INSTALL DOUBLE YELLOW LINE WITH MARKERS PER CALTRANS STD. PLAN A20A, DETAIL 22. INSTALL 6" SOLID WHITE CHEVRON LINE. INSTALL LANE DROPS AT INTERSECTIONS PER CALTRANS STD. PLAN A20C, DETAIL 37B. INSTALL YELLOW 4" DASH LANE LINE EXTENSION PER CALTRANS STD. A202D, DETAIL 41. INSTALL EXIT RAMP NEUTRAL AREA (GORE TREATMENT) WITH MARKERS (DETAIL 36) AND CHEVRON PAVEMENT MARKINGS AT EXIT RAMP GORE AREA PER CALTRANS STD.PLAN A20C. INSTALL LANE DROPS AT EXIT RAMPS PER CALTRANS STD. PLAN A20C, DETAIL 37. INSTALL ENNIS FLINT (PPG) BIKE MARK.THERMOPLASTIC GREEN BIKE FACILITY OR APPROVED EQUAL. 20' 20' 20' 20' 20' 20' 20' 20' STRIPING LEGEND ENNIS FLINT (PPG) PRE-MARK THERMOPLASTIC GREEN BIKE FACILITIES OR APPROVED EQUAL. TYP. TYP. 20' 20' TYPE E (TYP). TYPE D (TYP). TYPE D 14' 14' (TYP). 160' 40' 53' 65' 53' 20' 194' 20' 188' 188' 115' 17' 90' 53' 30' 101' 101' 339' INSTALL 6" SOLID WHITE LINE WITH NUMBER OF FEET INDICATED. 20' INSTALL 8" CHANNELIZING LINE PER CALTRANS STD. A20D, DETAIL 38A. INSTALL BIKE LANE SIGN (R81) AND BEGIN PLAQUE (R81A) ON EXISTING STREET LIGHT POLE. INSTALL BIKE LANE SIGN (R81) AND END PLAQUE (R81B) ON EXISTING STREET LIGHT POLE. INSTALL BIKE MAY USE FULL LANE SIGN (R4-11) ON EXISTING STREET LIGHT POLE OR NEW POST. TYPE E (TYP). TYP. 50' INSTALL 4" SOLID WHITE LINE. INSTALL 6" SOLID RED LINE. TYP. REFRESH STRIPING. INSTALL WHEEL STOP. INSTALL 4" SOLID RED LINE. NUMBER OF PARKING SPOTS. 20' TYP. RELOCATE PARKING SIGN FROM STREET LIGHT POLE TO NEW POST. INSTALL R25C (CA) SIGN (15 MIN LIMIT) ON EXISTING STREET LIGHT POLE. RESTRIPE 6" LETTER STENCIL FOR EXISTING MARKING "LOADING AND UNLOADING PASSENGER ONLY" IN BLACK. TYP. REMOVE EXISTING RED FLASHING BEACON AND STOP SIGN, AND INSTALL TRAFFICALM FLASHING LED STOP SIGN SYSTEM, INCLUDING SOLAR PANEL, LED FLASHING SIGN, 20W CONTROLLER, BATTERY AND ALL NECESSARY COMPONENTS OR APPROVED EQUAL. REMOVE EX. BLUE AND RED CURB PAINTS AND INSTALL BLUE CURB PAINT AT ACCESSIBLE PARKING SPACE. REMOVE CURB PAINT. 9' TYPE E (TYP). TYP. 98' YELLOW21' R/C 38' 80' 10 1 1 4 1 4 1 6 1 6 1 3 1 7 1 6 1 15 1 1 13 1 4 7 1 HERMOSA AVE INSTALL NEW PARKING METER POST PER SHEET ST-1, DETAIL 8. GENERAL NOTES: 1. ALL SIDEWALK AND MEDIAN CURBS SHALL BE REFRESHED WITH EXISTING COLOR UP TO THE NEW PAVEMENT LIMIT, UNLESS OTHERWISE SPECIFIED. 2. ALL EXISTING STRIPING ON CONCRETE AREAS WHERE CONFLICTS WITH THE NEW PAVEMENT LIMITS SHALLBE COMPLETELY REMOVED. REMOVE EXISTING PARKING METER. 12/11/24 12/11/24 Page 663 of 1852 11TH STREET CITY VEHICLE ONLY CITY VEHICLE ONLY CITY VEHICLE ONLY CITY VEHICLE ONLY CITY VEHICLE ONLY CITY VEHICLE ONLY CITY VEHICLE ONLY CITY VEHICLE ONLY CITY VEHICLE ONLY 20' (TYP).

8.5' (TYP).
12' 12'
22'(TYP).
19' 46' 94' 2' (TYP).
27+0028+00 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 8TH STREET
6TH STREET
12'
12'
20'18' 5' 20'11' 20' 20' 20' 5' 9' 12'
124'
62' 42' 2' (TYP).
29'
7' 35' 23+00 24+00 25+00 26+00
27+00 28+00 29+00
30+00
31+00
32+00
33+00
34+00
35+00
223 201 203 205 207 209 211
12'
12' 30' 35+00 36+00 37+00 38+00 40+00 41+00 42+00 43+00 44+00 45+00
39+00 1 59' 12'
12' 46+00 47+00 48+00 49+00
50+00 SCALE: 1"=40' VALLEY DRIVE VALLEY DRIVE
11TH ST
8TH ST
6TH ST
ST

HERONDO

T I C Y
O F

H E R M
O S A
B E A C H , C A 1 9 0 7 N

Y T I C
O F

H E R M
O
S A
B E A C H , C A 1 9 0 7 N

C O Y T I F
H
E
R

M O S A
B E A C H , C A 1 9 0 7 N Y T I C O F H E R M O S A B E A C H , C A 1 9 0 7 N "25" "XING" "PED" "STOP" "STOP" "STOP" "25" "AHEAD" "PED" "XING" "XING" "PED" 50' 50' 38' 50' 50' 50' 4' O.C. STRIPING CONSTRUCTION NOTES: "STOP" "STOP" "STOP" "STOP" "STOP" "STOP" "STOP" YELLOW YELLOW YELLOW YELLOW "AHEAD" TYP. TYP. TYP. 10'O.C. VALLEY DRIVE VALLEY DRIVE 2ND ST YELLOW 50' YELLOW "STOP" "STOP" "STOP" "STOP" "STOP" "STOP" "XING" "PED" "25" "STOP" "STOP" TYP. INSTAL ELECTRIC VEHICLE CHARGING STATION PAVEMENT MARKING DETAIL PER 2014 CA MUTCD FIGURE 3B-108(CA). INSTALL WHITE (UNLESS SPECIFIED OTHERWISE) CONTINENTAL TYPE CROSSWALK ALIGN 2' WIDE STRIPES WITH LANE LANE. INSTALL BROKEN BIKE LANE LINE PER CALTRANS STD. PLAN A20D, DETAIL 39A. INSTALL TYPE IV ARROWS AS SHOWN (TYP). INSTALL TYPE I 10'-0" ARROW AS SHOWN (TYP). INSTALL SOLID BIKE LANE LINE PER CALTRANS STD. PLAN A20D, DETAIL 39. INSTALL DOUBLE YELLOW LINE PER CALTRANS STD. PLAN A20A, DETAIL 21. INSTALL YIELD LINE PER CALTRANS STD. PLAN A24G. INSTALL PAVEMENT MARKING AS SHOWN PER CALTRANS STD. PLAN A24D & A24E. INSTALL 6" WHITE LANE LINE PER CALTRANS STD. PLAN A20A, DETAIL 8. INSTALL SHARED ROADWAY BICYCLE MARKING PER CALTRANS STD. PLAN A24C. INSTALL BIKE LANE SYMBOL WITH PERSON MARKING AND BIKE ARROW PER CALTRANS STD PLAN A24C AND A24A. INSTALL 2 SETS OF DOUBLE YELLOW LINE WITH MARKERS PER CALTRANS STD. PLAN A20B, DETAIL 29. INSTALL "L" AND "T" PARKING AS SHOWN (TYP), SEE DETAIL B ON SHEET ST-1. INSTALL 4" SOLID WHITE PARKING LINE (TYP). INSTALL BLUE INTERNATIONAL SYMBOL OF ACCESSIBILITY MARKING PER CALTRANS STD PLAN A24C. INSTALL SOLID 4" BLUE LINE AT 5' O.C. (ACCESS AISLE). INSTALL TWO-WAY LEFT TURN LANE WITH MARKERS PER CALTRANS STD. A20B, DETAIL 31. INSTALL 12" LIMIT LINE PER CALTRANS STD. PLAN A24G. INSTALL 6" YELLOW LINE. REMOVE CONFLICTING STRIPE AND MARKINGS BY WET SANDBLASTING. INSTALL 6" WHITE LANE LINE WITH MARKERS PER CALTRANS STD. PLAN A20A, DETAIL 9. INSTALL SOLID 4" WHITE LINE AT 5' O.C. (ACCESS AISLE). INSTALL 2 SETS OF DOUBLE YELLOW LINE WITH MARKERS PER CALTRANS STD. PLAN A20B, DETAIL 28. INSTALL TRAFFIC LOOPS AS INDICATED ON PLANS. SPLICE NEW LOOP WIRES TO EXISTING DLC AT THE NEAREST DLC PULL BOX (TYP). INSTALL "CITY VEHICLE PARKING" MARKER PER CITY'S APPROVAL (TYP). INSTALL 6" YELLOW CENTERLINE WITH MARKERS PER CALTRANS STD. PLAN A20A, DETAIL 2. INSTALL 6" YELLOW CENTERLINE PER CALTRANS STD. PLAN A20A, DETAIL 1. INSTALL DOUBLE YELLOW LINE WITH MARKERS PER CALTRANS STD. PLAN A20A, DETAIL 22. INSTALL 6" SOLID WHITE CHEVRON LINE. INSTALL LANE DROPS AT INTERSECTIONS PER CALTRANS STD. PLAN A20C, DETAIL 37B. INSTALL YELLOW 4" DASH LANE LINE EXTENSION PER CALTRANS STD. A202D, DETAIL 41. INSTALL EXIT RAMP NEUTRAL AREA (GORE TREATMENT) WITH MARKERS (DETAIL 36) AND CHEVRON PAVEMENT MARKINGS AT EXIT RAMP GORE AREA PER CALTRANS STD.PLAN A20C. INSTALL LANE DROPS AT EXIT RAMPS PER CALTRANS STD. PLAN A20C, DETAIL 37. INSTALL SEALMASTER SAFERIDE BRIGHT GREEN PAINT OR EQUAL ON BIKE LANE, DOUBLE COATS. INSTALL 6" SOLID WHITE LINE WITH NUMBER OF FEET INDICATED. INSTALL 8" CHANNELIZING LINE PER CALTRANS STD. A20D, DETAIL 38A. INSTALL BIKE LANE SIGN (R81) AND BEGIN PLAQUE (R81A) ON EXISTING STREET LIGHT POLE. INSTALL BIKE LANE SIGN (R81) AND END PLAQUE (R81B) ON EXISTING POST. INSTALL BIKE MAY USE FULL LANE SIGN (R4-11) ON EXISTING STREET LIGHT POLE OR NEW POST. INSTALL 4" SOLID WHITE LINE. INSTALL 6" SOLID RED LINE. REFRESH STRIPING. ON EXISTING POST ON NEW POST ON NEW POST ON NEW POST ON NEW POST ON NEW POST ON EXISTING POST ON EXISTING STREET LIGHT ON NEW POST ON EXISTING POST "STOP" STRIPING LEGEND ENNIS FLINT (PPG) PRE-MARK THERMOPLASTIC GREEN BIKE FACILITIES OR APPROVED EQUAL. INSTALL 4' LONG CONCRETE WHEEL STOP, AMERICAN PRECAST CONCRETE INC. OR APPROVED EQUAL.

PIER AVE TYP. 14' (TYP). 14' (TYP). 14' (TYP).
14' (TYP).
14' (TYP). INSTALL 4" SOLID RED LINE. TYP. GENERAL NOTES: 1. ALL SIDEWALK AND MEDIAN CURBS SHALL BE REFRESHED WITH EXISTING COLOR UP TO THE NEW PAVEMENT LIMIT, UNLESS OTHERWISE SPECIFIED. 2. ALL EXISTING STRIPING ON CONCRETE AREAS WHERE CONFLICTS WITH THE NEW PAVEMENT LIMITS SHALLBE COMPLETELY REMOVED. 12/11/24 12/11/24 Page 664 of 1852 10+00 11+00 12+00 13+00 14+00 15+00
10+00
11+00 12+00 13+00 14+00 15+00 16+00
11+00 12+00 13+00 14+00 15+00 16+00
10+00 11+00 12+00 13+00 14+00 15+00 10+00 10+00 10+00 13+00 14+00 11+00 12+00 10+00
10+00
15+00 10+00 11+00 12+00 13+00 14+00 15+00 16+00
17+00 SCALE: 1"=40' POWER ST
20TH ST
21ST ST 24TH ST
ARDMORE AVE 15TH ST

OCEAN DR
PACIFIC COAST HWY 14TH ST 15TH PL PROSPECT AVE 11TH PL HARPER AVE 14TH ST

CORONA ST

OWOSSO AVE

BONNIE BRAE ST
OCEAN

PROSPECT AVE
PACIFIC COAST HWY16TH ST C I T Y
O F

H E R M O S A
B
E A C H , C 1 A 9 0 7 N

Y T I C
O F

H E R M
O
S A
B E A C H , C A 1 9 0 7 N

C I T Y O F

H E R M O S A
B
E A C H , C A 1 9 0 7 N

C I T Y O F

H E R M O S A
B
E A C H , C A 1 9 0 7 N

C I T Y O F

H E R M O S A
B E A C H , C A 1 9 0 7 N "STOP" "25" YELLOW YELLOW "STOP" "STOP" "STOP" "STOP" STRIPING CONSTRUCTION NOTES: "STOP""SLOW" "STOP" "STOP" "STOP" "STOP" "STOP" 47' 196' "STOP" TYPE E (TYP). TYPE D (TYP). INSTAL ELECTRIC VEHICLE CHARGING STATION PAVEMENT MARKING DETAIL PER 2014 CA MUTCD FIGURE 3B-108(CA). INSTALL WHITE (UNLESS SPECIFIED OTHERWISE) CONTINENTAL TYPE CROSSWALK ALIGN 2' WIDE STRIPES WITH LANE LANE. INSTALL BROKEN BIKE LANE LINE PER CALTRANS STD. PLAN A20D, DETAIL 39A. INSTALL TYPE IV ARROWS AS SHOWN (TYP). INSTALL TYPE I 10'-0" ARROW AS SHOWN (TYP). INSTALL SOLID BIKE LANE LINE PER CALTRANS STD. PLAN A20D, DETAIL 39. INSTALL DOUBLE YELLOW LINE PER CALTRANS STD. PLAN A20A, DETAIL 21. INSTALL YIELD LINE PER CALTRANS STD. PLAN A24G. INSTALL PAVEMENT MARKING AS SHOWN PER CALTRANS STD. PLAN A24D & A24E. INSTALL 6" WHITE LANE LINE PER CALTRANS STD. PLAN A20A, DETAIL 8. INSTALL SHARED ROADWAY BICYCLE MARKING PER CALTRANS STD. PLAN A24C. INSTALL BIKE LANE SYMBOL WITH PERSON MARKING AND BIKE ARROW PER CALTRANS STD PLAN A24C AND A24A. INSTALL 2 SETS OF DOUBLE YELLOW LINE WITH MARKERS PER CALTRANS STD. PLAN A20B, DETAIL 29. INSTALL "L" AND "T" PARKING AS SHOWN (TYP), SEE DETAIL B ON SHEET ST-1. INSTALL 4" SOLID WHITE PARKING LINE (TYP). INSTALL BLUE INTERNATIONAL SYMBOL OF ACCESSIBILITY MARKING PER CALTRANS STD PLAN A24C. INSTALL SOLID 4" BLUE LINE AT 5' O.C. (ACCESS AISLE). INSTALL TWO-WAY LEFT TURN LANE WITH MARKERS PER CALTRANS STD. A20B, DETAIL 31. INSTALL 12" LIMIT LINE PER CALTRANS STD. PLAN A24G. INSTALL 6" YELLOW LINE. REMOVE CONFLICTING STRIPE AND MARKINGS BY WET SANDBLASTING. INSTALL 6" WHITE LANE LINE WITH MARKERS PER CALTRANS STD. PLAN A20A, DETAIL 9. INSTALL SOLID 4" WHITE LINE AT 5' O.C. (ACCESS AISLE). INSTALL 2 SETS OF DOUBLE YELLOW LINE WITH MARKERS PER CALTRANS STD. PLAN A20B, DETAIL 28. INSTALL TRAFFIC LOOPS AS INDICATED ON PLANS. SPLICE NEW LOOP WIRES TO EXISTING DLC AT THE NEAREST DLC PULL BOX (TYP). INSTALL "CITY VEHICLE PARKING" MARKER PER CITY'S APPROVAL (TYP). INSTALL 6" YELLOW CENTERLINE WITH MARKERS PER CALTRANS STD. PLAN A20A, DETAIL 2. INSTALL 6" YELLOW CENTERLINE PER CALTRANS STD. PLAN A20A, DETAIL 1. INSTALL DOUBLE YELLOW LINE WITH MARKERS PER CALTRANS STD. PLAN A20A, DETAIL 22. INSTALL 6" SOLID WHITE CHEVRON LINE. INSTALL LANE DROPS AT INTERSECTIONS PER CALTRANS STD. PLAN A20C, DETAIL 37B. INSTALL YELLOW 4" DASH LANE LINE EXTENSION PER CALTRANS STD. A202D, DETAIL 41. INSTALL EXIT RAMP NEUTRAL AREA (GORE TREATMENT) WITH MARKERS (DETAIL 36) AND CHEVRON PAVEMENT MARKINGS AT EXIT RAMP GORE AREA PER CALTRANS STD.PLAN A20C. INSTALL LANE DROPS AT EXIT RAMPS PER CALTRANS STD. PLAN A20C, DETAIL 37. INSTALL SEALMASTER SAFERIDE BRIGHT GREEN PAINT OR EQUAL ON BIKE LANE, DOUBLE COATS. INSTALL 6" SOLID WHITE LINE WITH NUMBER OF FEET INDICATED. INSTALL 8" CHANNELIZING LINE PER CALTRANS STD. A20D, DETAIL 38A. INSTALL BIKE LANE SIGN (R81) AND BEGIN PLAQUE (R81A) ON EXISTING STREET LIGHT POLE. INSTALL BIKE LANE SIGN (R81) AND END PLAQUE (R81B) ON EXISTING POST. INSTALL BIKE MAY USE FULL LANE SIGN (R4-11) ON EXISTING STREET LIGHT POLE OR NEW POST. INSTALL 4" SOLID WHITE LINE. INSTALL 6" SOLID RED LINE. REFRESH STRIPING. "STOP" INSTALL WHEEL STOP. 5' R/C 17' R/C 14' R/C 6' R/C INSTALL 4" SOLID RED LINE. TYP.

DR GENERAL NOTES: 1. ALL SIDEWALK AND MEDIAN CURBS SHALL BE REFRESHED WITH EXISTING COLOR UP TO THE NEW PAVEMENT LIMIT, UNLESS OTHERWISE SPECIFIED. 2. ALL EXISTING STRIPING ON CONCRETE AREAS WHERE CONFLICTS WITH THE NEW PAVEMENT LIMITS SHALLBE COMPLETELY REMOVED. 12/11/24 12/11/24 Page 665 of 1852 10+00
11+00
12+00 10+00 11+00
10+00
10+00
11+00 10+00 11+00 13+00 14+00 15+00 16+00 12+00 11+00 10+00 623
651
653 861 10+00 11+00 12+00 13+00 14+00 15+00
31ST PL C I T Y
O F

H E R M O S A
B
E A C H , C A 1 9 0 7 C N I T Y O F

H E R M O S A
B
E A C H , C A 1 9 0 7 N I C T Y O F H E R M O S A B E A C H , C A 1 9 0 N7 I C T Y O F H E R M O S A B E A C H , C A 1 9 0 N7 SCALE: 1"=40' 20TH ST 20TH ST 21ST ST

RHODES ST

RHODES ST

MORNINGSIDE DR
28TH ST
29TH ST
29TH CT
30TH PL
9TH ST

PACIFIC COAST HWY

ARDMORE AVE
31ST ST
30TH ST ALLEY STRIPING CONSTRUCTION NOTES: "STOP" "STOP" "STOP" "STOP" "STOP" INSTAL ELECTRIC VEHICLE CHARGING STATION PAVEMENT MARKING DETAIL PER 2014 CA MUTCD FIGURE 3B-108(CA). INSTALL WHITE (UNLESS SPECIFIED OTHERWISE) CONTINENTAL TYPE CROSSWALK ALIGN 2' WIDE STRIPES WITH LANE LANE. INSTALL BROKEN BIKE LANE LINE PER CALTRANS STD. PLAN A20D, DETAIL 39A. INSTALL TYPE IV ARROWS AS SHOWN (TYP). INSTALL TYPE I 10'-0" ARROW AS SHOWN (TYP). INSTALL SOLID BIKE LANE LINE PER CALTRANS STD. PLAN A20D, DETAIL 39. INSTALL DOUBLE YELLOW LINE PER CALTRANS STD. PLAN A20A, DETAIL 21. INSTALL YIELD LINE PER CALTRANS STD. PLAN A24G. INSTALL PAVEMENT MARKING AS SHOWN PER CALTRANS STD. PLAN A24D & A24E. INSTALL 6" WHITE LANE LINE PER CALTRANS STD. PLAN A20A, DETAIL 8. INSTALL SHARED ROADWAY BICYCLE MARKING PER CALTRANS STD. PLAN A24C. INSTALL BIKE LANE SYMBOL WITH PERSON MARKING AND BIKE ARROW PER CALTRANS STD PLAN A24C AND A24A. INSTALL 2 SETS OF DOUBLE YELLOW LINE WITH MARKERS PER CALTRANS STD. PLAN A20B, DETAIL 29. INSTALL "L" AND "T" PARKING AS SHOWN (TYP), SEE DETAIL B ON SHEET ST-1. INSTALL 4" SOLID WHITE PARKING LINE (TYP). INSTALL BLUE INTERNATIONAL SYMBOL OF ACCESSIBILITY MARKING PER CALTRANS STD PLAN A24C. INSTALL SOLID 4" BLUE LINE AT 5' O.C. (ACCESS AISLE). INSTALL TWO-WAY LEFT TURN LANE WITH MARKERS PER CALTRANS STD. A20B, DETAIL 31. INSTALL 12" LIMIT LINE PER CALTRANS STD. PLAN A24G. INSTALL 6" YELLOW LINE. REMOVE CONFLICTING STRIPE AND MARKINGS BY WET SANDBLASTING. INSTALL 6" WHITE LANE LINE WITH MARKERS PER CALTRANS STD. PLAN A20A, DETAIL 9. INSTALL SOLID 4" WHITE LINE AT 5' O.C. (ACCESS AISLE). INSTALL 2 SETS OF DOUBLE YELLOW LINE WITH MARKERS PER CALTRANS STD. PLAN A20B, DETAIL 28. INSTALL TRAFFIC LOOPS AS INDICATED ON PLANS. SPLICE NEW LOOP WIRES TO EXISTING DLC AT THE NEAREST DLC PULL BOX (TYP). INSTALL "CITY VEHICLE PARKING" MARKER PER CITY'S APPROVAL (TYP). INSTALL 6" YELLOW CENTERLINE WITH MARKERS PER CALTRANS STD. PLAN A20A, DETAIL 2. INSTALL 6" YELLOW CENTERLINE PER CALTRANS STD. PLAN A20A, DETAIL 1. INSTALL DOUBLE YELLOW LINE WITH MARKERS PER CALTRANS STD. PLAN A20A, DETAIL 22. INSTALL 6" SOLID WHITE CHEVRON LINE. INSTALL LANE DROPS AT INTERSECTIONS PER CALTRANS STD. PLAN A20C, DETAIL 37B. INSTALL YELLOW 4" DASH LANE LINE EXTENSION PER CALTRANS STD. A202D, DETAIL 41. INSTALL EXIT RAMP NEUTRAL AREA (GORE TREATMENT) WITH MARKERS (DETAIL 36) AND CHEVRON PAVEMENT MARKINGS AT EXIT RAMP GORE AREA PER CALTRANS STD.PLAN A20C. INSTALL LANE DROPS AT EXIT RAMPS PER CALTRANS STD. PLAN A20C, DETAIL 37. INSTALL SEALMASTER SAFERIDE BRIGHT GREEN PAINT OR EQUAL ON BIKE LANE, DOUBLE COATS. INSTALL 6" SOLID WHITE LINE WITH NUMBER OF FEET INDICATED. INSTALL 8" CHANNELIZING LINE PER CALTRANS STD. A20D, DETAIL 38A. INSTALL BIKE LANE SIGN (R81) AND BEGIN PLAQUE (R81A) ON EXISTING STREET LIGHT POLE. INSTALL BIKE LANE SIGN (R81) AND END PLAQUE (R81B) ON EXISTING POST. INSTALL BIKE MAY USE FULL LANE SIGN (R4-11) ON EXISTING STREET LIGHT POLE OR NEW POST. INSTALL 4" SOLID WHITE LINE. INSTALL 6" SOLID RED LINE. REFRESH STRIPING. "STOP" INSTALL WHEEL STOP. INSTALL 4" SOLID RED LINE. GENERAL NOTES: 1. ALL SIDEWALK AND MEDIAN CURBS SHALL BE REFRESHED WITH EXISTING COLOR UP TO THE NEW PAVEMENT LIMIT, UNLESS OTHERWISE SPECIFIED. 2. ALL EXISTING STRIPING ON CONCRETE AREAS WHERE CONFLICTS WITH THE NEW PAVEMENT LIMITS SHALLBE COMPLETELY REMOVED. 12/11/24 12/11/24 Page 666 of 1852 COLD MILL 2" DEPTH (INCLUDES REMOVAL OF EXISTING FABRIC, APPLY TACK COAT AND CONSTRUCT 2" ARHM OVERLAY. ADJUST MANHOLE FRAME AND COVER TO GRADE. ADJUST UTILITY VALVE TO GRADE. CONSTRUCTION NOTES: PROTECT IN PLACE. ADJUST UTILITY COVER TO GRADE. REMOVE EX. GUTTER AND CONSTRUCT 3' PCC GUTTER PER SPPWC STD. 122-3. C I T Y O F H E R M O S A B E A C H , C A 1 9 0 7 N REMOVE EX. BOLLARD. (TYP). PAVEMENT LEGEND 2" COLD MILL AND 2" ARHM OVERLAY CONCRETE REPAIR AREA REMOVE EXISTING FENCE, FABRIC, POSTS, AND POSTS FOUNDATION, BACK FILL EXCAVATED AREAS WITH TWO SACKS SLURRY MIX AND INSTALL 8' HIGH TYPICAL CHAIN LINK FENCE WITHOUT BARB WIRE WITH DRIVE GATE PER SPPWC. STD. 600-4 WITH ULINE PRIVACY BLACK SCREEN OR EQUAL. REMOVE ALL (~79) EXISTING WHEELS STOPS. REMOVE GUARD RAIL INCLUDING FOUNDATION AND BACKFILL EXCAVATED AREAS WITH TWO SACK SLURRY MIX. SALVAGE, REMOVE, AND REINSTALL SIGN POST (TYP). SALVAGE, REMOVE, AND REINSTALL TRASH CAN. SCALE: 1" = 10' DEMOLITION LEGEND REMOVE EX. UPRIGHT BOLLARD, FOUNDATION, AND FILL WITH TWO SACKS SLURRY MIX. REMOVE EX. BOLLARD FOUNDATION AND FILL WITH TWO SACKS SLURRY MIX. DEMOLITION TABLE ITEM NUMBER OF REMOVAL UPRGHT BOLLARD AND FOUNDATION LEFT OVER BOLLARD FOUNDATION ~10 ~17 EXISTING WHEEL STOP ~79 GENERAL NOTES: 1. CONTRACTOR SHALL VERIFY NECESSARY NUMBER OF BOLLARD, FOUNDATION, AND MISC. FOR REMOVAL BEFORE COLD MILL. 2. CONTRACTOR SHALL PROVIDE THE CONSTRUCTION SURVEY FOR THE 3' WIDE PCC GUTTER. THE GRADE SHALL BE A STRAIGHT SLOPE FROM THE UPSTREAM TO THE DOWNSTREAM POINTS PER THE ENGINEER'S DIRECTION. 3. ACCESSIBLE PARKING STALLS SHALL COMPLY WITH ADA STANDARDS. 4. REMOVE ALL EXISTING WHEEL STOPS. 5. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING WITH THE BUSINESS OWNERS TO TEMPORARILY RELOCATE TRASH BINS DURING THE CONSTRUCTION PHASE TO ENSURE SAFE AND UNOBSTRUCTED ACCESS TO THE SITE. THE BINS SHOULD BE REPOSITIONED IN A MANNER THAT MINIMIZES DISRUPTION TO BUSINESS OPERATIONS AND COMPLIES WITH LOCAL REGULATIONS. GENERAL LEGEND SIGN POST UTILITY BOX/VAULT FENCE PROTECTED BOLLARD WHEEL STOP RAIL WATER VALVE GRATE STREET LIGHT SEWER MANHOLE ELECTRICAL BOX/VAULT EV CHARGE STATION FENCE ENCLOSURE 5 BEACH DR 11th ST PARKING LOT A: 1101 HERMOSA AVE 12/11/24 12/11/24 Page 667 of 1852

C I T Y O F

H E R M O S A
B
E A C H , C A 1 9 0 7 N SCALE: 1" = 10' 11th ST
HERMOSA AVE CONSTRUCTION NOTES: PAVEMENT LEGEND 2" COLD MILL AND 2" ARHM OVERLAY CONCRETE REPAIR AREA DEMOLITION LEGEND REMOVE EX. UPRIGHT BOLLARD, FOUNDATION, AND FILL WITH TWO SACKS SLURRY MIX. REMOVE EX. BOLLARD FOUNDATION AND FILL WITH TWO SACKS SLURRY MIX. DEMOLITION TABLE ITEM NUMBER OF REMOVAL UPRGHT BOLLARD AND FOUNDATION LEFT OVER BOLLARD FOUNDATION ~10 ~17 EXISTING WHEEL STOP ~79 GENERAL NOTES: 1. CONTRACTOR SHALL VERIFY NECESSARY NUMBER OF BOLLARD, FOUNDATION, AND MISC. FOR REMOVAL BEFORE COLD MILL. 2. CONTRACTOR SHALL PROVIDE THE CONSTRUCTION SURVEY FOR THE 3' WIDE PCC GUTTER. THE GRADE SHALL BE A STRAIGHT SLOPE FROM THE UPSTREAM TO THE DOWNSTREAM POINTS PER THE ENGINEER'S DIRECTION. 3. ACCESSIBLE PARKING STALLS SHALL COMPLY WITH ADA STANDARDS. 4. REMOVE ALL EXISTING WHEEL STOPS. 5. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING WITH THE BUSINESS OWNERS TO TEMPORARILY RELOCATE TRASH BINS DURING THE CONSTRUCTION PHASE TO ENSURE SAFE AND UNOBSTRUCTED ACCESS TO THE SITE. THE BINS SHOULD BE REPOSITIONED IN A MANNER THAT MINIMIZES DISRUPTION TO BUSINESS OPERATIONS AND COMPLIES WITH LOCAL REGULATIONS. GENERAL LEGEND SIGN POST UTILITY BOX/VAULT FENCE PROTECTED BOLLARD WHEEL STOP RAIL WATER VALVE GRATE STREET LIGHT SEWER MANHOLE ELECTRICAL BOX/VAULT EV CHARGE STATION FENCE ENCLOSURE 5 PARKING LOT A: 1101 HERMOSA AVE COLD MILL 2" DEPTH (INCLUDES REMOVAL OF EXISTING FABRIC, APPLY TACK COAT AND CONSTRUCT 2" ARHM OVERLAY. ADJUST MANHOLE FRAME AND COVER TO GRADE. ADJUST UTILITY VALVE TO GRADE. PROTECT IN PLACE. ADJUST UTILITY COVER TO GRADE. REMOVE EX. GUTTER AND CONSTRUCT 3' PCC GUTTER PER SPPWC STD. 122-3. REMOVE EX. BOLLARD. (TYP). REMOVE EXISTING FENCE, FABRIC, POSTS, AND POSTS FOUNDATION, BACK FILL EXCAVATED AREAS WITH TWO SACKS SLURRY MIX AND INSTALL 8' HIGH TYPICAL CHAIN LINK FENCE WITHOUT BARB WIRE WITH DRIVE GATE PER SPPWC. STD. 600-4 WITH ULINE PRIVACY BLACK SCREEN OR EQUAL. REMOVE ALL (~79) EXISTING WHEELS STOPS. REMOVE GUARD RAIL INCLUDING FOUNDATION AND BACKFILL EXCAVATED AREAS WITH TWO SACK SLURRY MIX. SALVAGE, REMOVE, AND REINSTALL SIGN POST (TYP). SALVAGE, REMOVE, AND REINSTALL TRASH CAN. 12/11/24 12/11/24

Page 668 of 1852 ends

123' 18' 15' (TYP.) 20' 72' 230' 238' 8' (TYP). 553 552 551 550 555 554 557 556 605 604 603 602 608 607 606 611 610 609 614 613 612 615 628 575 625 626 627 622 623 624 618 619 620 621 616 617 590 590 590 590 590 590 590 590 590 567 566 565 566 567 568 569 570 571
640 641 630 629 632 631 634 633 557 552 636 635 534 533 532 535 9' (TYP.) 9' (TYP.) 18' 4' 8' (TYP.) 9' 9' 8' 3' 17' 19' (TYP.) 9' 9' 17' (TYP). COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT 10.7' C I T Y O F H E R M O S A B E A C H , C A 1 9 0 7 N INSTALL SOLID 4" WHITE LINE AT PARKING STALLS (TYP).

INSTALL SOLID 4" GREEN LINE AT PARKING STALLS (TYP).

INSTALL TYPE I 10'-0" ARROW AS SHOWN (TYP). CHECK SIZE STRIPING CONSTRUCTION NOTES: INSTALL SOLID 4" WHITE DIAGONAL LINE AT PARKING STALLS (TYP). INSTALL SOLID 4" SOLID BLUE LINE AT PARKING STALLS (TYP). INSTALL PAVEMENT MARKING AS SHOWN PER CALTRANS STD. PLAN A24D & A24E. INSTALL BLUE INTERNATIONAL SYMBOL OF ACCESSIBILITY MARKING PER CALTRANS STD PLAN A24C. INSTALL SOLID 4" WHITE LINE AT 5' O.C. (WIDE ACCESS AISLE).PAINT PARKING LOT NUMBER PER CITY'S APPROVAL (TYP).

INSTALL TYPE IV ARROWS AS SHOWN (TYP). INSTALL EV CHARGING PARKING SPACE MARKER PER CITY'S APPROVAL. INSTALL SOLID 4" RED LINE AT PARKING STALLS (TYP).

INSTALL SOLID 4" RED LINE AT 5' O.C. (TYP).

INSTALL "MOTORCYCLE" MARKER PER CITY'S APPROVAL (TYP). SCALE: 1" = 10' 11th ST INSTALL SOLID 4' FIRE LANE.

BEACH DR TYP. TYP. TYP. PARKING LOT A: 1101 HERMOSA AVE INSTALL 4' LONG CONCRETE WHEEL STOP, AMERICAN PRECAST CONCRETE INC. OR APPROVED EQUAL. 12/11/24 12/11/24

Page 669 of 1852 ends

21' 18' 18'9' 8' 9' 9' 5' 9' 9' 5' 63' 18' 138' 9' (TYP.) 16.7' (TYP.) 9' (TYP.) MOTORCYCLE20' 539 531 530 542 541 540 545 544 543 548 547 546 592 591 590 589 594 593 596 595 599 598 597 601 600 584 585 586 587 582 583 579 580 581 576 577 578 528 529 524 525 526 527 522 523 519 520 521 517 518 516 515 514 513 512 511 510 509 508 507 506 505 504 503 502 501 500 33' (TYP.) 18' 4' 3' 3' 8.5' (TYP.) 6' 5' 4' 5' C I T Y O F H E R M O S A B E A C H , C A 1 9 0 7 N INSTALL SOLID 4" WHITE LINE AT PARKING STALLS (TYP).

INSTALL SOLID 4" GREEN LINE AT PARKING STALLS (TYP).

INSTALL TYPE I 10'-0" ARROW AS SHOWN (TYP). CHECK SIZE STRIPING CONSTRUCTION NOTES: INSTALL SOLID 4" WHITE DIAGONAL LINE AT PARKING STALLS (TYP). INSTALL SOLID 4" SOLID BLUE LINE AT PARKING STALLS (TYP). INSTALL PAVEMENT MARKING AS SHOWN PER CALTRANS STD. PLAN A24D & A24E. INSTALL BLUE INTERNATIONAL SYMBOL OF ACCESSIBILITY MARKING PER CALTRANS STD PLAN A24C. INSTALL SOLID 4" WHITE LINE AT 5' O.C. (WIDE ACCESS AISLE).PAINT PARKING LOT NUMBER PER CITY'S APPROVAL (TYP).

INSTALL TYPE IV ARROWS AS SHOWN (TYP). INSTALL EV CHARGING PARKING SPACE MARKER PER CITY'S APPROVAL. INSTALL SOLID 4" RED LINE AT PARKING STALLS (TYP).

INSTALL SOLID 4" RED LINE AT 5' O.C. (TYP).

INSTALL "MOTORCYCLE" MARKER PER CITY'S APPROVAL (TYP). SCALE: 1" = 10' HERMOSA AVE INSTALL SOLID 4' FIRE LANE. 11th ST TYP. TYP. TYP. PARKING LOT A: 1101 HERMOSA AVE INSTALL 4' LONG CONCRETE WHEEL STOP, AMERICAN PRECAST CONCRETE INC. OR APPROVED EQUAL. 12/11/24 12/11/24

Page 670 of 1852 ends

1 CITY OF HERMOSA BEACH CONTRACT

DOCUMENTS AND SPECIFICATIONS FOR
CIP NO. 105 and 695
Annual Street Improvements and Parking Lot A Improvements December 2024

Page 671 of 1852 ends

2 City of Hermosa Beach

NOTICE INVITING BIDS
Notice is hereby given that the City of Hermosa Beach will receive electronic bids until 2:00pm on Wednesday, January 15, 2025, at which time the electronic bids will be publicly opened at the City Council Chambers at 1315 Valley Drive, Hermosa Beach, CA 90254 and posted on Planet Bids for CIP No. 105 Annual Street Improvements and 695 Parking Lot A Improvements.

A mandatory pre-bid meeting will be held at 10:00AM on Tuesday, January 7, 2025 at Pier Ave and Valley Dr. The City will respond to questions from prospective Bidders at that time.

Attendance at this meeting is required in order to submit a bid.

The project includes, but is not limited to, cold mill and asphalt rubber hot mix (ARHM) overlay with select full depth dig-outs; remove and reconstruct curb ramps, sidewalk, curb, curb and gutter, and all related work thereto.

The engineer’s cost estimate for the project is $3,300,000. License requirement is a valid State of California Contractors License Class “A”.

All sidewalk and access ramp removals shall be replaced within 48 hours. Traffic control plans are required as part of this project to maintain uninterrupted safe vehicular and pedestrian traffic throughout the work areas.

The duration of the project is 75 working days. All bids must be submitted electronically on Planet Bids Portal, accessible through the City’s webpage at https://www.hermosabeach.gov/our-government/city-clerk/bids-and-proposals where you must first register as a vendor through our Planet Bids Portal. Contract Documents, plans, and specifications will be available for review on Planet Bids. All relevant materials shall be obtained from the link above.

Each proposal must be accompanied by a cash deposit, a certified or cashier's check, or a Bidder's bond, made payable to the City of Hermosa Beach, in an amount not less than 10 percent of the total bid submitted.

The successful Bidder will be required to furnish a faithful performance bond in the amount of 100 percent of the Contract price, a payment bond in the amount of 100 percent of the Contract price, and a warranty bond all in the attached form satisfactory to the City Attorney. The successful Bidder will also be required to pay the State of California prevailing wage scale as determined by the Department of Industrial Relations, available at http://www.dir.ca.gov/dlse/dlsePublicWorks.html.

The Contractor must be registered with the Department of Industrial Relations at the time of bid. Contractor’s registration information is available at:
https://www.dir.ca.gov/Public-Works/Contractor-Registration.html The City reserves the right to reject any or all bids and to waive any informality or irregularity in any bid received and to be the sole judge of the merits of the respective

Page 672 of 1852 ends

3 bids received. The award, if made, will be made to the lowest responsive and responsible Bidder.

Please submit any questions related to this bid on Planet Bids portal no later than 5pm on Thursday, January 9, 2025.

Page 673 of 1852 ends

4 TABLE OF CONTENTS
CIP NO. 105 & 695
Annual Street Improvements and Parking Lot A Improvements I. PROJECT DESCRIPTION AND UNDERSTANDING ................................................... 5 II. NOTICE TO BIDDERS .................................................................................................. 6 III. INSTRUCTION TO BIDDERS ..................................................................................... 8 IV. BID DOCUMENTS...................................................................................................... 17 A. PROPOSAL...................................................................................................................... 17 B. BID SCHEDULE.............................................................................................................. 18 C. BID BOND ........................................................................................................................ 22 D. BIDDER'S ASSURANCE................................................................................................ 25 E. BIDDER'S DECLARATION........................................................................................... 26 F. CERTIFICATE OF NON-DISCRIMINATION BY CONTRACTORS...................... 28 G. CERTIFICATION OF PRINCIPAL.............................................................................. 29 H. DECLARATION OF ELIGIBILITY TO CONTRACT............................................... 30 I. NON-COLLUSION DECLARATION ............................................................................ 31 J. REFERENCES OF WORK.............................................................................................. 32 K. SUBCONTRACTORS LIST........................................................................................... 34 L. IRAN CONTRACTING ACT CERTIFICATION........................................................ 37 M. PUBLIC WORKS CONTRACTOR REGISTRATION CERTIFICATION............. 38 V. CONTRACT DOCUMENTS.................................................................................................39 A. CONTRACT AGREEMENT.......................................................................................... 42 B. AGREEMENT OF INDEMNIFICATION .................................................................... 60 C. EQUALS ........................................................................................................................... 61 D.FAITHFUL PERFORMANCE BOND ........................................................................... 62 E. PAYMENT BOND (LABOR AND MATERIALS) ....................................................... 67 F. GUARANTEE TO THE CITY OF HERMOSA BEACH ............................................. 71 G. GENERAL COMPREHENSIVE LIABLITY ADDITONAL INSURED
ENDORSMENT.................................................................................................................... 72 H. AUTOMOBILE LIABILITY ADDITIONAL INSURED ENDORSEMENT............ 74 I. INSTRUCTIONS FOR COMPLETING, EXECUTING, AND SUBMITTING EVIDENCE OF INSURANCE TO THE OWNER ............................................................ 76 J. WORKER'S COMPENSATION INSURANCE CERTIFICATE................................ 78 K. SUPPLEMENTAL INFORMATION TO BE COMPLETED BY PRINCIPAL........ 79 L. W9 FORM......................................................................................................................... 80 M. COMPLIANCE WITH CARB REGULATIONS......................................................... 80 VI. SPECIAL PROVISIONS..................................................................................................SP-1

Page 674 of 1852 ends

5 City of Hermosa Beach
CIP NO. 105 & 695
Annual Street Improvements and Parking Lot “A” Improvements I. PROJECT DESCRIPTION AND UNDERSTANDING
The scope of work for this project generally includes cold milling of existing pavement and construction of asphalt rubber hot mix (ARHM) overlay with select full depth pavement repair as shown on plans; removal and reconstruction of curb ramp, sidewalk, curb, curb and gutter, and cross-gutter at various locations as shown on the plans and all necessary work to complete the work per project plans and specifications.

This project includes work along Pier Avenue from Pacific Coast Highway to Hermosa Avenue and Parking Lot “A” in the heart of downtown Hermosa Beach- a vital city thoroughfare. As such, this project shall be completed in distinct and consecutive phases as described in Special Provisions, Section 900-1 and below:

Phase 1- Concrete Improvements- Contractor shall complete concrete improvements along Pier Avenue and Parking Lot “A” prior to commencing concrete work at other listed locations.

Contractor will be permitted to complete concrete improvements at other listed locations only after completion of Phase 1 and during Phase 2.

Phase 2- Contractor shall complete paving rehabilitation of Pier Avenue and Parking Lot “A”.

Paving along Pier Avenue shall be completed prior to start of paving rehabilitation at Parking Lot “A”.

Phase 3- Completion of work at other listed locations per plans and specifications.

The Contractor is responsible for production and submittal of traffic control plans in accordance with the requirements of the Special Provisions. Traffic control plans shall be considered a construction submittal subject to review by the Engineer.

Page 675 of 1852 ends

6 II. NOTICE TO BIDDERS
Prospective Bidder: To be considered as a responsive Bidder you must register on Planet Bids portal through the city’s website at https://www.hermosabeach.gov/ourgovernment/city-clerk/bids-and-proposals .

Pre-bid Meeting: There will be a mandatory pre-bid meeting at 10:00AM on Tuesday , January 7, 2025 at the intersection of Pier Ave. and Valley Dr.(Greenbelt area). The City will respond to questions from prospective Bidders at that time. Attendance at this meeting is required in order to submit a bid. Each prospective Bidder shall familiarize itself with the plans and work site(s) to satisfy itself that it has the abilities and resources to complete the work.

Bid Documents: Bid Documents, including but not limited to specifications and proposal forms, will be available for download on Planet Bids Portal, accessible through the webpage at:
https://pbsystem.planetbids.com/portal/51313/bo/bo-search.

To the extent required by Section 20103.7 of the Public Contract Code, upon request from a Contractor plan room service, the City shall provide an electronic copy of the Contract Documents at no charge to the Contractor plan room.

It is the responsibility of each prospective Bidder to download and print all bid documents for review and to verify the completeness of Bid Documents before submitting a bid. The City does not assume any liability or responsibility based on any defective or incomplete copying, excerpting, scanning, faxing, downloading, or printing of the Bid Documents.

Questions: All questions regarding this bid shall be submitted through Planet Bids no later than January 9, 2025 at 5pm. Proposers shall not contact City personnel or Elected Officials with any questions or clarifications concerning this Invitation for Bids other than through Planet Bids. Any City response for this Bid that is not posted through Planet Bids is unauthorized and will be considered invalid.

Submittal of Bids: Electronic bids shall be submitted through Planet Bids until January 15, 2025 at 2:00pm at which time they will be publicly opened and read in the City Council Chambers at 1315 Valley Drive, Hermosa Beach, CA. All bids shall be valid for a period of 90 calendar days after the bid opening date.

Bidder’s Guarantee: Each bid must be accompanied by cash or a certified check or a cashier's check or Bidder's bond made payable to the City of Hermosa Beach for an amount equal to at least ten percent (10%) of the bid price. In accordance with Public Contract Code Section 20170, the Bidder’s Bond shall be issued by a surety company admitted to do business in the State of California. Further, in accordance with Public Contract Code Section 20172, such guarantee shall be forfeited should the Bidder to whom the Contract is awarded fail to enter into the Contract within the specified time.

Payment, Performance Bonds: The successful Bidder will be required to furnish a Faithful Performance Bond and a Labor and Material Payment Bond, each in an amount equal to one hundred percent (100%) of the Contract Price. Each bond shall be in the forms set forth herein and shall be secured from a surety company that meets all State of California bonding

Page 676 of 1852 ends

7 requirements, as defined in California Code of Civil Procedure Section 995.120, and that is a California admitted surety insurer.

Substitution of Securities: Pursuant to Section 22300 of the Public Contract Code of the State of California, the successful Bidder may substitute certain securities for funds withheld by the City to ensure its performance under the Contract.

Contractor License: In accordance with provisions of Section 3300 of the California Public Contract Code, City of Hermosa Beach has determined that the Contractor shall possess a valid “A” California Contractor’s License. Failure to possess such license may render the bid as non-responsive and bar the award of the Contract to that non-responsive Bidder.

Prevailing Wages: Pursuant to Labor Code Section 1773, the Contractor shall pay the prevailing rate of per diem wages and the prevailing wage rate for holiday and overtime work applicable in Los Angeles County from the Director of the Department of Industrial Relations for each craft, classification, or type of worker needed to execute this Contract. A copy of these prevailing wage rates may be obtained by visiting:
https://www.dir.ca.gov/Public-Works/Prevailing-Wage.html In addition, a copy of the prevailing rate of per diem wages will be made available at the City’s Public Works Department upon request. The successful Bidder shall post a copy of the prevailing wage rates at each job site. It shall be mandatory for the Bidder to whom the Contract is awarded, and for any subcontractors, to comply with all Labor Code provisions, which include but are not limited to the payment of not less than the said specified prevailing wage rates to all workers employed by them in the execution of the Contract, employment of apprentices, hours of labor, and debarment of Contractors and subcontractors.

Contractor’s Registration with the Department of Industrial Relations (DIR): The Bidder’s attention is directed to Labor Code Section 1725.5, which provides that a Contractor or subcontractor shall not be qualified to bid on, be listed in a Bid proposal, subject to the requirements of Public Contract Code Section 4104, or engage in the performance of any Contract that is subject to Labor Code Section 1720 et seq., unless currently registered and qualified to perform public work pursuant to Labor Code Section 1725.5. No Bid will be accepted, nor any Contract entered into without proof of the Contractor’s and subcontractors’ current registration with the DIR to perform public work. If awarded a Contract, the Bidder and its subcontractors, of any tier, shall maintain active registration with the DIR for the duration of the Project.

Compliance Monitoring and Enforcement: Contractor’s performance of the Work described in the Notice Inviting Bids is subject to compliance monitoring and enforcement by the California Department of Industrial Relations. In bidding on this Project, it shall be the Bidder’s sole responsibility to evaluate and include the cost of complying with all labor compliance requirements under this Contract and applicable law in its Bid.

Award of Contract: The City shall award the Contract for the Project to the lowest responsive, responsible Bidder as determined by the City from the total base bid. City reserves the right to reject any or all bids or to waive any irregularities or informalities in any bids or in the bidding process.

Page 677 of 1852 ends

8 III. INSTRUCTION TO BIDDERS
Form of Proposal: The proposal shall be fully executed and submitted on the forms provided by the City. Proposal forms can be obtained from Planet Bids.

Signatures: All places where signatures are required must be fully executed.

Proposal: Documents which shall be signed and returned to the City with the Bid Proposal are:

A. Proposal
B. Bid Schedule
C. Bid Bond
D. Bidder’s Assurance
E. Bidder’s Declaration
F. Certificate of Non-Discrimination by Contractors
G. Certification of Principal
H. Declaration of Eligibility to Contract
I. Non-Collusion Declaration
J. References for Work
K. SubContractor List
L. Iran Contracting Act Certification
M. Public Works Contractor Registration Certification
N. Addenda (if applicable)
Contract: Documents which shall be signed and returned to the City by the successful Bidder within 10 days of notification of intent to award Contract:

A. Contract Agreement
B. Agreement of Indemnification and Hold Harmless and Waiver of Subrogation and Contribution
C. Equals
D. Faithful Performance Bond
E. Payment Bond (Labor and Materials)
F. Guarantee to the City of Hermosa Beach
G. General Comprehensive Liability Additional Insured Endorsement H. Automobile Liability Additional Insured Endorsement
I. Instructions for Completing, Executing, and Submitting Evidence of Insurance to the Owner
J. Worker’s Compensation Insurance Certificate
K. Supplemental Information to be Completed by Principal L. W-9 Form
M. Compliance with CARB regulations
N. Copy of City Business License
Delivery of Proposal: Each Bid prepared by Bidder shall be completed in itself and shall be submitted electronically through Planet Bids.

Page 678 of 1852 ends

9 Prevailing Wage: In accordance with the provisions of Section 1770 et seq., of the Labor Code, the Director of the Department of Industrial Relations of the State of California has ascertained the general prevailing rate of wages which is the minimum amount which shall be paid to all workers employed to perform the work. A copy of the determination is on file in the office of the City Clerk and is hereby incorporated herein and made a part hereof as though fully set forth herein.

A copy of the determination will be made available to any interested person upon request and shall be posted at the job site.

Overtime: As per Labor Code Section 1810 et seq., eight (8) hours is the legal working day.

The Contractor shall pay overtime for each worker who works in excess of the legal working day.

Payment: Refer to the Contract Agreement for payment information. Contractorshall submit progress payment requests on City approved form.

Required Bonds: Prior to the execution of the Contract, the successful Bidder shall file with the City surety bonds in the amounts and for the purposes noted below. The surety insurer shall be a California admitted surety insurer, as defined in Code of Civil Procedure section 995.120. Contractor shall pay all premiums and costs thereof and incidental thereto.

Per Civil Code section 3247, a Payment Bond is required if the Contract is for more than $25,000.

The successful Bidder shall give three (3) surety bonds with good and sufficient sureties:
"Payment Bond – Labor and Materials" shall be so conditioned as to insure to the benefit of persons furnishing materials for or performing labor upon the work. Bond to be in the sum of not less than 100% of the Contract price to assure the claims of materialmen supplying materials to Contractor, and for payment to laborers and subcontractors employed on the project.
“Faithful Performance Bond" in the sum of not less than 100% of the Contract price to assure the faithful performance of the Contract; shall be conditioned as to assure the faithful performance by the Contractor of all work under said Contract, in a manner that is satisfactory and acceptable to the City; that all materials and workmanship supplied by him will be free from original or developed defects; and that should original or developed defects or failures appear, the Contractor shall, at his own expense, make good such defects and failures and make all replacements and adjustments required, within a reasonable time after being notified by the City to do so, and to the satisfaction of the City.

Rejection of Proposals: The City reserves the right to reject any and all proposals and to waive any minor or technical discrepancies or irregularities. Proposals may be rejected if they show any alteration of form, additions not called for, conditional bids, incomplete bids, erasures, or irregularities of any kind.

Agents: When proposals are signed by an agent, other than the officer or officers of a corporation authorized to sign Contracts on its behalf or a member of a partnership, a "Power of Attorney" must be on file with the City prior to opening bids or shall be submitted with the proposal; otherwise, the proposal will be rejected as irregular and unauthorized.

Page 679 of 1852 ends

10 Withdrawal of Proposals: Any bid may be withdrawn at any time prior to the time fixed in the public notice for the opening of bids only by written request for the withdrawal of the bid filed with the City Engineer. The request shall be executed by the Bidder or their duly authorized representative. The withdrawal of a bid does not prejudice the right of the Bidder to file a new bid. Bids are opened exactly at the time fixed in the public notice for opening bids. A bid will not be received after that time, nor may any bid be withdrawn after that time. No Bidder may withdraw his bid within ninety (90) days after the actual date of the opening thereof.

Insurance: Without limiting Contractor's indemnification, Contractor shall maintain in force at all times during the performance of this agreement the insurance provisions set out in the Contract Agreement.

City Business License and Permits: The successful Bidder shall obtain a valid City of Hermosa Beach Business License prior to commencing work under this Contract.

The successful Bidder will be required to obtain City Right of Way Permit to work in public right-of-way, issued at no fee for the project.

Increased or Decreased Quantities: The City reserves the right to increase, or decrease, or to entirely eliminate items or portions of items from work if found desirable or expedient.

Approximate Estimate: The quantities in the Bid Schedule are approximate only, being given as a basis for the comparison of bids. The City does not, expressly or by implication, agree that the actual amount of work will correspond therewith. The Contractor shall verify in the field the accuracy of the estimated quantities.

Examination of Plans, Specifications, Contract, and Site of Work: The Bidder shall examine carefully the site of the work contemplated, the Plans and Specifications, and the proposal and Contract forms therefor. The submission of a bid shall be conclusive evidence that the Bidder has investigated and is satisfied as to the conditions to be encountered, as to the character, quality and scope of work to be performed, the quantities of materials to be furnished, and as to the requirements of the proposal, Plans, Specifications, and the Contract.

Where the City may have made investigations of subsurface conditions in areas where work is to be performed under the Contract, such investigations are made only for the purpose of study and design. Where such investigations have been made, Bidders or Contractors may, upon written request, inspect the records of the City as to such investigations subject to and upon the conditions hereinafter set forth. Such inspection of records may be made at the office of the City Engineer.

The records of such investigations are not a part of the Contract and are shown solely for the convenience of the Bidder or Contractor. It is expressly understood and agreed that the City assumes no responsibility whatsoever in respect to the sufficiency or accuracy of the investigations thus made, the records thereof, or of the interpretations set forth therein or made by the City in its use thereof and there is no warranty or guaranty, either expressed or implied, that the conditions indicated by such investigations or records thereof are representative of those existing throughout such areas, or any part thereof, or that unlooked for developments may not occur, or that materials other than, or in proportions different than these indicated, may not be encountered.

Page 680 of 1852 ends

11 Bidders shall satisfy themselves by personal examination of the locations of the proposed work, and by such other means as they may choose as to actual conditions and requirements and as to the accuracy of the quantities stated in the Proposal forms. Information derived from the maps, plans, specifications, profiles, or drawings, or from the Engineer or his assistants (or the Architects or their assistants), shall not relieve the Bidder of this responsibility, and the interpretation of the data disclosed by borings or other preliminary investigations is not guaranteed nor is any liability assumed by the City.

If a prospective Bidder is in doubt as to the true meaning or intent of any part of the Contract Documents including the Specifications, or discovers discrepancies in, or omissions from, the Specifications or Drawings, they may submit to the Engineer a written request for an interpretation or a correction thereof via Planet Bids. Interpretations or corrections of the Contract Documents including the Specifications and Drawings, shall be made only by addendum duly issued by the Engineer, and a copy of such addendum will be uploaded on Planet Bids and such addendum shall be considered a part of and incorporated in the Contract Documents.

Relief of Bidders: If the Bidder claims a mistake was made in their bid, the Bidder shall give the City written notice within five (5) days after the opening of the bids of the alleged mistake, specifying in the notice in detail how the mistake occurred.

Disqualification of Bidders: More than one proposal from an individual, firm, partnership, corporation, or combination thereof under the same or different names will not be considered.

Reasonable grounds for believing that any individual, firm, partnership, corporation, or combination thereof is interested in more than one proposal for the work contemplated may cause the rejection of all proposals in which such individual, firm, partnership, corporation, or combination thereof is interested. If there is reason for believing that collusion exists among the Bidders, any or all proposals may be rejected. Proposals in which the prices obviously are unbalanced due to mathematical errors may be rejected.

Award of Contract: The award of the Contract, if it be awarded, will be to the lowest responsible Bidder whose proposal complies with all of the requirements prescribed. Such award, if made, will normally be made within in ninety (90) calendar days of the opening of the proposals.

If the lowest responsible Bidder refuses or fails to execute the Contract, the City may award the Contract to the second lowest responsible Bidder. If the second lowest responsible Bidder refuses or fails to execute the Contract, the City may award the Contract to the third lowest responsible Bidder.

Execution of Contract: The Contract shall be signed by the successful Bidder and returned, together with the Contract bonds, insurance endorsements and certificates, and all other required documents within ten (10) business days after the Bidder has received notice of intent to award.

Failure to Execute Contract: Failure of the lowest responsible Bidder, the second lowest responsible Bidder, or the third lowest responsible Bidder to execute the Contract and file acceptable bonds as provided herein within ten (10) business days after such Bidder has received notice that the Contract has been awarded to them shall be just cause for the

Page 681 of 1852 ends

12 forfeiture of the proposal guaranty. The successful Bidder may file with the City Engineer a written notice, signed by the Bidder, or his authorized representative, specifying that the Bidder will refuse to execute the Contract if presented to him. The filing of such notice shall have the same force and effect as the failure of the Bidder to execute the Contract and furnish acceptable bonds within the time herein above prescribed.

Return of Proposal Guaranties: Within ten (10) business days after the award of the Contract to the lowest responsible Bidder, the City will return the proposal guaranties, other than Bidder's bonds, accompanying such of the proposals as are not to be further considered in making the award. Retained proposal guaranties will be held until the Contract has been finally executed, after which all proposal guaranties, except Bidder's bonds and any guaranties which have been forfeited, will be returned to the respective Bidders whose proposals they accompany.

Qualifications of Bidders: Each Bidder shall be skilled and regularly engaged in the general class or type of work called for under the Contract. A statement setting forth their experience shall be submitted by each Bidder on the References of Work form provided herein.

Each Bidder shall possess valid active Contractor’s License issued by the Contractor’s State License Board at the time their bid is submitted. The class of license shall be applicable to the work specified in the Contract. Each Bidder shall also have no less than five (5) years’ experience in the magnitude and the character of the work bid.

Pursuant to section 1103 of the Public Contract Code, City staff has determined that the following non-exhaustive experience is reasonably necessary to satisfactorily perform the public works Contract:

The Contractor shall have a minimum of three (3) projects of similar type of construction and magnitude with other public agencies within the past five (5) years.

The Contractor shall have been in the business under the same name and California Contractor’s License for a minimum of five (5) continuous years prior to the bid opening date for this project. The license used to satisfy this requirement shall be of the same type as that required by the Contract.

The Contractor shall perform above 50% of the Contract with its own forces.

Bidders must be thoroughly competent and capable of satisfactorily performing the work covered by the proposal. They shall have had project experience similar to the project scope of work. When requested, they shall furnish such statements relative to previous experience on similar work, the plan or procedure proposed, and the organization, machinery, plant, and other equipment available for the contemplated work, and the financial condition and resources of the Bidder, as may be deemed necessary by the City Engineer in determining such competence and capability.

The City of Hermosa Beach will not enter into a Contract with any Bidder who is not properly licensed to do the work of this Contract under the provisions of Section 7000 et seq., of the Business and Professions Code, unless particularly exempted by the terms thereof. A bid by a Contractor who is not properly licensed shall be considered non-responsive and will be rejected. The Contractor must hold all sub-Contractors to these same Contract requirements.

Page 682 of 1852 ends

13 The sheet for Bidder's signature in the Bid Proposal shall clearly show the Contractor's name, address, telephone number, State of California Contractor’s license number, classification, and date of expiration.

Completeness of Bids: Bids are required for the entire work. The amount of the bid for comparison purposes will be the total bid price of all items. The Bidder shall set forth the bid price for each item in the respective spaces provided for these purposes.

In case of discrepancy between the unit price and the total set forth for the item, the unit price shall prevail, provided, however, if the amount set forth as a unit price is ambiguous, unintelligible or uncertain for any cause, or is omitted, or in the case where the unit price is the same amount as the entry in the "Total" column, then the amount set forth in the "Total" column for the item shall prevail in accordance with the following:
a) As to lump sum items, the amount set forth in the "Total" column shall be the unit price.
b) As to unit price items, the amount set forth in the "Total" column shall be divided by the estimated quantity for the item and the price thus obtained shall be the unit price.

The City may waive technical or non-substantive inconsistencies in any bid.

Non-discrimination: Pursuant to the provisions of 31 CFR, Part 51, Section 51.55, the Revenue Sharing Act, notice is hereby given of the following policy, effective immediately:

The City of Hermosa Beach does not discriminate on the basis of handicapped status in admission or access to, or treatment of, or employment in, its programs and activities. The office that will coordinate compliance is that of Human Resources.

Workers’ Compensation Insurance: Before execution of this Agreement by the City, the Contractor shall file with the City’s Risk Manager the following signed certification:
“I am aware of, and will comply with, Section 3700 of the Labor Code, requiring every employer to be insured against liability for Workers’ Compensation or to undertake selfinsurance before commencing any of the work.” The Contractor shall also comply with Section 3700 of the Labor Code by securing, paying for and maintaining in full force and effect for the duration of this Agreement, complete Workers’ Compensation Insurance, and shall furnish a Certificate of Insurance to the City’s Risk Manager reflecting such insurance before this Agreement becomes effective.

Contractor shall fully indemnify and hold harmless City, its attorneys, agents, officers, and employees for any claims in law or equity occasioned by the failure of Contractor to comply with the terms of this section. Every Workers’ Compensation Insurance policy required hereunder, shall bear an endorsement, or shall have attached a rider, providing that in the event of expiration or proposed cancellation of such policy for any reason whatsoever, the City’s Risk Manager shall be notified of such action by registered mail, postage prepaid, return receipt requested, at least 30 days before such expiration or cancellation becomes effective.

Indemnification: Bidders are instructed to refer to the Contract Agreement.

Page 683 of 1852 ends

14 Subcontractors: Bidders must list the name, address of the place of business, Contractor license number, and DIR registration number for each subcontractor to be responsible for more than 1/2 of 1% of the total bid, and the portion of the job for which that subcontractor is responsible. Only one subcontractor may be listed for each portion of the job.

Unfair Business Practices Claims: In entering into a public works Contract or a subcontract to supply goods, services, or materials pursuant to a public works Contract, the Contractor or sub-Contractor offers and agrees to assign to the awarding body all rights, title, and interest in and to all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C.

Section 15) or under the Cartwright Act (Chapter 2, (commencing with Section 16700) of Part 2 of Division 7 of the Business and Professions Code), arising from purchases of goods, services, or materials pursuant to the public works Contract or the subcontract. This assignment shall be made and become effective at the time the awarding body renders final payment to the Contractor without further acknowledgment by the parties. (Section 7103.5, California Public Contract Code.)
Bidder Registration Requirement: Pursuant to Labor Code sections 1725.5 and 1771.1, all Contractors and subcontractors that wish to bid on, be listed in a bid proposal, or enter into a Contract to perform public work must be registered with the Department of Industrial Relations (DIR). No bid will be accepted, nor any Contract entered into without proof of the Contractor’s and subcontractors’ current registration with the DIR to perform public work.

If awarded a Contract, the Bidder and its subcontractors, of any tier, shall maintain active registration with the DIR for the duration of the Project. To this end, Bidder shall sign and submit with its bid proposal the Public Works Contractor Registration Certification on the form provided, attesting to the facts contained therein. Failure to submit this form may render the bid non-responsive. In addition, each Bidder shall provide the registration number for each listed subcontractor in the space provided in the Subcontractors List form.

Claim Procedures: Bidders are instructed to refer to the Contract Documents, including by way of illustration and not by limitation the Contract Agreement.

Protest Procedures: Bidders may file a “protest” of a bid proposal with the City’s City Manager. In order for a Bidder’s protest to be considered valid, the protest must:

A. Be filed in writing within five (5) calendar days after the bid opening date; B. Clearly identify the specific irregularity or accusation; C. Clearly identify the specific City staff determination or recommendation being protested;
D. Specify in detail the grounds for protest and the facts supporting the protest; E. Include all relevant supporting documentation with the protest at time of filing; and F. Be transmitted concurrently to all other parties with a direct financial interest that may be adversely affected by the outcome of the protest. Such parties shall include all other Bidders or proposers who appear to have a reasonable prospect of receiving an award depending upon the outcome of the protest.

If the protest does not comply with each of these requirements, the City may reject the protest

Page 684 of 1852 ends

15 with or without further review.

If the protest is timely and complies with the above requirements, the City Manager, or other designated City staff member, shall review the protest, any response from the challenged Bidder(s), and all other relevant information, and will provide a written decision to the protestor.

The City Manager or designee shall have up to ten calendar days to decide whether to approve or reject the protest. The written decision of the City Manager or designee on the protest shall be served upon the protesting Bidder and any Bidder subject to the protest within fourteen (14) calendar days of receipt of the bid protest. The City Manager or designee may extend the ten (10) calendar days if necessary, to review additional information requested from any Bidder.

If the protester wishes to further contest the protest, it shall appeal this decision to the City Council by filing a statement of appeal with the City Clerk within five (5) days of the issuance of the City Manager’s decision. Said statement of appeal shall include all information required of the original bid protest, as well as s short and plain statement setting forth why Protester disputes the City Manager’s decision and the legal and factual basis for such dispute. Any person or entity may present a formal protest to the City with respect to solicitations being conducted by staff.

A Bidder whose bid has been protested by another Bidder may submit to the City Manager a written response to the protest by email or by personal delivery or overnight mail to City Hall, 1315 Valley Drive, Hermosa Beach, California 90254, so that it is received by the City no later than seven calendar days after the protest has been served by the protesting Bidder.

1. Definitions
a. “Bidder” means any person or firm providing a timely, written response to the City solicitation.
b. “Bid Protest” means any protest with regard to the response submitted by another Bidder.
c. “Response” means the written response to the City solicitation provided by a person or firm.
d. “Solicitation Protest” means a statement of protest, dispute, challenge, disagreement, disapproval or other objection regarding documents, determinations or actions taken or contemplated by the City with respect to a solicitation.
e. “Solicitation” means the document by which the City identifies goods, equipment, services, or public construction projects for which it seeks a response.

2. Format – The protest must be in writing and include the following information at a minimum:
a. The name, address, and phone number of the protester, or the authorized representative of the protester;

Page 685 of 1852 ends

16 b. The signature of the protester or authorized representative of the protester; c. The project number and title under which the protest is submitted; d. A detailed description of the legal and/or factual grounds for the protest and all supporting documentation. For protests containing elements not based on publicly released information the protest must contain documentation clearly showing the date on which the protester received the information; and e. The form of relief requested.

3. State or Federal Funding
If the subject matter of the solicitation or project is receiving any state or federal funds which requires a protest procedure different than the procedures stated above, then that protest procedure shall control.

In the event there is any lawsuit filed against the City relating to any federally funded project, the City will provide prompt notice of that lawsuit to all agencies who participated in the funding of the project.

4. Mandatory Procedure
This administrative procedure and the time limits set forth herein are mandatory.

Failure to comply with these mandatory procedures shall constitute a waiver of any right to pursue the bid protest, including filing a Government Code claim or any legal proceedings or actions.

Page 686 of 1852 ends

17 IV. BID DOCUMENTS
A. PROPOSAL
CIP NO. 105 & 695
Annual Street Improvements and Parking Lot A Improvements CONTRACTOR: Date: ___________________
TO: City of Hermosa Beach
Honorable Mayor and Members of the City Council City Hall Hermosa Beach, California, 90254
Ladies and Gentlemen:

The undersigned declares that he/she has carefully examined the location of the proposed work and that he/she has examined the Plans and Specifications, has read the Contract Documents, and hereby agrees to furnish all labor, materials, equipment, tools, transportation, and services to do all work required for:

CIP NO. 105 & 695
Annual Street Improvements and Parking Lot A Improvements In accordance with the Plans and Specifications prepared by the Engineer, in accordance with the Special Provisions, the Contract Documents, and in accordance with the Standard Specifications for Public Works Construction 2021, Unified Building Code for Construction (current edition) (except Sections 1-9), and the requirements of the Engineer under said documents, for the prices shown herein.

The Contractor also certifies that he/she is registered with the Department of Industrial Relations.

All work shall be completed within 75 working days from the date the Notice to Proceed is issued by the Engineer.

Contractor Signature PWCR Registration Number

Page 687 of 1852 ends

18 B. BID SCHEDULE
CIP NO. 105 and 695
Annual Street Improvements and Parking Lot A Improvements Item
No.

Estimated
Quantity Unit Description of Work SpecificationReference Unit
Price Total
1 1 LS
Mobilization and Demobilization
(5% max. of total bid schedule
cost)
7-6
7-3.4 $
2 1 LS Traffic Control 7-6
601 $
3 1 LS Surveying Services 7-6
400-2
$
4 360,000 SF Cold Mill 2” Depth (Includes
Removal of Existing Fabric)
7-6
404-1
$
5 60 EA Adjust Manhole Frame and
Cover as Required
7-6
403-1
$
6 66 EA Adjust Utility Cover to Grade as
Required
7-6
402-7
$
7 41,000 SF
Remove Existing AC Pavement
Section to 6” Deep and
Construct 4” B-mix AC Base
Course per Detail 3, Sheet ST-1,
excluding ARHM overlay
7-6
203-6
302-5
$
8 5,200 TON Construct 2” ARHM
7-6
203-11
302-9
$
9 21 EA
Remove and Reconstruct ADA
Curb Ramp over 4” CMB Per
SPPWC STD. Plan 111-5, Case
and Type per Plan
7-6
303-5
$
10 700 LF
Remove Ex. Curb or Curb &
Gutter and Construct PCC Curb
and Gutter over 8” CMB per
SPPWC Std. 120-3
7-6
303-5
$
11 2,500 SF Remove and Reconstruct 4”
PCC Sidewalk over 4” CMB
7-6
303-5
$
12 240 SF
Remove and Reconstruct PCC
Driveway per SPPWC Std. 110-
2 over 8” CMB
7-6
303-5
$
13 110 SF Install Liquid Applied Truncated
Dome 7-6 $

Page 688 of 1852 ends

19 Item
No.

Estimated
Quantity Unit Description of Work SpecificationReference Unit
Price Total
14 160 EA Remove Existing Wheel Stops 7-6 $
15 9,300 SF
Sawcut, Remove and
Reconstruct 8” PCC Pavement
over 8” CMB per Detail 1, Sheet
ST-1
7-6 $
16 320 LF
Remove Ex. Longitudinal Gutter
and Construct 3’ Wide PCC
Longitudinal Gutter over 8”
CMB per SPPWC STD 122-3
7-6
303-5
$
17 10 EA
Remove Ex. Upright Bollard,
Foundation, and fill with Two
Sack Slurry
7-6 $
18 17 EA Remove Ex. Bollard Foundation
and fill with Two Sack Slurry 7-6 $
19 1 LS Remove Guard Rail and fill with
Two Sack Slurry 7-6 $
20 250 LF
Remove Existing Fence and all
Foundation, backfill Two Sack
Slurry and Install 8’ High
Typical Chain Link Fence
without Barb Wire with Drive
Gate per SPPWC. STD.600-4
with ULINE Privacy Black
Screen or Equal
7-6 $
21 1 LS Signage and Striping 7-6 $
22 12 EA Furnish and Install Inductive
Loop Detectors (Type E) 7-6 $
23 5 EA Furnish and Install Inductive
Loop Detectors (Type D) 7-6 $
24 200 CY
Unclassified Excavation for
Potential unsuitable Material
only as Required
7-6 $
25 200 CY
CMB for Potential Unsuitable
Material Replacement only as
Required
7-6 $
26 2 EA
Furnish and Plant 24” Box
Brisbane Box including
installation of Root Barrier per
SPPWC Std. 520-5 and 20 Gal
Tree Gator for Each Tree and
Grade “A” Top Soil to match
adjacent Sidewalk Grade.
7-6
800-1.4
801-4
$

Page 689 of 1852 ends

20 (Total Bid in Figures)
(Total Bid in Words)
Contractor Name:

In case of any discrepancy between the words and the figures, the words shall prevail. If the unit price and the total amount for any item are not in agreement, the unit price alone shall be considered to represent the Bidder’s intention and all totals will be corrected to conform thereto. Attached hereto is cash, a certified check, a cashier's check, or a Bidder's bond in the amount of

__________________________________________________Dollars, said amount being not less than ten (10) percent of the amount bid. It is agreed a portion equal to the difference between the low bid and second low bid shall be retained as liquidated damages by the City if the undersigned fails or refuses to execute the Contract and furnish the required bonds and certificates of insurance within the time provided.

Contractor Signature: __________________________________________ PW Registration #:

Item
No.

Estimated
Quantity Unit Description of Work SpecificationReference Unit
Price Total
27 1 EA
Remove up to 30” Dia. Tree
Along with Roots. Prune Roots
to 2’ Deep and Grade “A” Top
Soil to match adjacent Sidewalk
Grade.
7-6
401-8
$
28 2 EA Remove and Install New Parking
Meter Post 7-6
29 60 SF Remove and Install New Pavers
to Match Adjacent Grade. 7-6
30 60 LF
Remove Ex. Curb and Construct
8” PCC Curb over 8” CMB per
SPPWC STD. 120-3.
7-6
31 300 SF
Remove and Excavate Ex. Curb
and Gutter and AC Pavement
and Construct 4’ Wide PCC
Cross Gutters and Spandrel over
8” CMB per SPPWC STD 122-

3. 7-6

Page 690 of 1852 ends

21 State License #: _________
Contractor Company Name: __________________________________________

Page 691 of 1852 ends

22 C. BID BOND
KNOW ALL MEN BY THESE PRESENTS:

WHEREAS, ________________________________, (hereinafter referred to as "Contractor") intends to submit a bid to the City of Hermosa Beach, California, a Municipal Corporation, for the performance of certain work as required in the City of Hermosa Beach CIP NO. 105 Annual Street Improvements & CIP NO. 695 Parking Lot A Improvements said work being: CIP NO. 105 Annual Street Improvements & CIP NO. 695 Parking Lot A Improvements as shown in this specification, and in compliance with the specifications therefore under an invitation of said City contained in a notice or advertisement for bids or proposals.

NOW, THEREFORE, we, the Contractor, as Principal, and
______________________ _______________________________ a corporation organized and existing under the laws of the State of _________________, duly authorized to transact business under the laws of the State of California as Surety, are held and firmly bound unto the City of Hermosa Beach, as Obligee, in the sum of
___________________________________ Dollars ($_______________) lawful money of the United States of America, said sum being not less than ten percent (10%) of the bid amount for the payment of which sum well and truly to be made, the said Principal, and said Surety, bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION IS SUCH THAT: If the bid of the said Principal is rejected by the said Obligee; or if the said Obligee shall accept the bid of the said Principal and said Principal shall enter into an Agreement with said Obligee in accordance with the terms of the bid, and shall give such bond or bonds as may be specified in the bidding or Contract Documents with good and sufficient surety for the faithful performance of such Agreement and for the prompt payment of labor and material furnished in the prosecution thereof; or in the event of the failure of said Principal to enter such Agreement and give such bond or bonds, if said Principal shall pay to said Obligee the difference not to exceed the penalty thereof between the amount specified in said bid and such larger amount for which said Obligee may in good faith Contract with another party to perform the work covered by said bid, then this obligation shall be null and void, otherwise to remain in full force and effect. In case suit is brought upon this bond, the court shall fix and award and the surety shall pay, in addition to the face amount hereof, costs and reasonable attorney's fees incurred by the City of Hermosa Beach in successfully enforcing said obligation.

IN WITNESS THEREOF, we have hereunto, set our hands and seals this ___________ day of ______________________, ______. ...........

Principal
By

Page 692 of 1852 ends

23 Title
Surety
By

Title

Page 693 of 1852 ends

24 Notary Acknowledgment
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.

STATE OF CALIFORNIA
COUNTY OF ______________
On , 20___, before me, _______________________________, Notary Public, personally appeared , who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.

Signature of Notary Public

OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document.

CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT ¨
Individual
¨ Corporate Officer
Title(s) Title or Type of Document
¨ Partner(s) ¨ Limited
¨ General Number of Pages
¨ Attorney-In-Fact
¨ Trustee(s)
¨ Guardian/Conservator Date of Document
¨ Other:

Signer is representing:

Name Of Person(s) Or Entity(ies)
Signer(s) Other Than Named Above

Page 694 of 1852 ends

25 D. BIDDER'S ASSURANCE
CIP NO. 105 & 695
Annual Street Improvements and Parking Lot A Improvements FROM:

Name of Bidder:

Business Address:

Telephone No:

TO:

Members of the City Council
c/o City Hall
City of Hermosa Beach, California
Members of the City Council:

Pursuant to your published Notice Inviting Bids for: CIP NO. 105 Annual Street Improvements & CIP NO. 695 Parking Lot A Improvements
The undersigned declares that he/she has carefully examined the location of the proposed work; that he/she has carefully examined the Plans and Specifications, and read the accompanying Instructions to Bidders and hereby proposes to furnish all materials, machinery, tools, labor, and services and do all the work necessary to complete the project in accordance with said Plans and Specifications and other Contract Documents at the item prices on the bidding schedule.

BY: TITLE:

Page 695 of 1852 ends

26 E. BIDDER'S DECLARATION
CIP NO. 105 & 695
Annual Street Improvements and Parking Lot A Improvements It is understood and agreed that:

1. The undersigned has carefully examined all documents which will form a part of the Contract; namely, the Notice Inviting Bids, the Instructions to Bidders, this Proposal, the Bid Bond, the Contract, the Faithful Performance Bond, Warranty Bond, the Payment Bond, the federal requirements, if any, the Plans and Specifications, the Special Provisions, and the Technical Provisions.

2. The undersigned has, by investigation at the site of the work and otherwise, satisfied himself as to the nature and location of the work and fully informed himself as to all conditions and matters, which can in any way affect the work or the cost thereof.

3. The undersigned fully understands the scope of work and has checked carefully all words and figures inserted in this Proposal and he further understands that the City will not be responsible for any errors or omissions in the preparation of the Proposal.

4. The undersigned agrees and acknowledges that he is aware of the provisions of Section 3700 of the Labor Code which requires every employer to be insured against liability for workers' compensation or to undertake self-insurance in accordance with the provisions of that Code, and that the undersigned will comply with such provisions before commencing the performance of the Contract if it is awarded to the undersigned.

The undersigned will execute the Contract and furnish the required statutory bonds and certificates of insurance within the period of time specified in the Contract Documents.

The undersigned will begin work after award of Contract and a Notice to Proceed has been given as herein specified and will complete said work within the time specified in the Bidding Schedule.

5. The undersigned certifies that this Proposal is genuine and not sham or collusive, or made in the interest or on behalf of a person not herein named, and the undersigned has not directly or indirectly induced or solicited any other Bidder to put in a sham bid nor induced any other person, firm, or corporation to refrain from bidding.

6. The undersigned will accept an award and enter into a Contract for all work scheduled herein on which he puts in a bid. The awards for such work are to be entirely at the discretion of the Owner after evaluation of the bids as submitted. The undersigned agrees that the Owner shall recover or retain as liquidated damages an amount equal to the difference between the low bid and amount of the bid of the Bidder with whom the City enters into a Contract, and the surplus, if any, shall be returned to the lowest Bidder in accordance with the provisions of the Public Contract Code section 20174 in the event of his failure to execute a Contract and furnish required bonds and insurance therefor within the time provided.

7. This bid will not be withdrawn within a period of ninety (90) days after the date of its

Page 696 of 1852 ends

27 proper opening by the City.

8. The undersigned Bidder stated under penalty of perjury that the representations made in submitting this bid are, to the best of his/her knowledge, true, accurate, and complete.

Respectfully submitted,
Contractor's Business Name Contractor Signature Title
Business Address: Street By Title
City State Zip Contractor's License No. and
Classification
Business Phone Number Date
Name Title Residence: Street
City State Zip Residence Phone Number
Note: If the bid is made by an individual, it must be signed with the full name of the Bidder, whose address must be given: if it is made by a firm, it must be signed in the copartnership's name by a general partner thereof, who shall also sign his or her own name, and the name and full address of each member must be given; and if it is made by a corporation, it must be signed by a properly authorized officer, the corporate name shall be set forth, and the corporate seal shall be affixed.

Page 697 of 1852 ends

28 F. CERTIFICATE OF NON-DISCRIMINATION BY CONTRACTORS
CIP NO. 105 & 695
Annual Street Improvements and Parking Lot A Improvements As suppliers of goods or services to the City, the firm listed below certifies that it does not discriminate in its employment with regard to race, color, religion, sex, or national origin; that it is in compliance with all applicable federal, state, and local directives, and executive orders regarding non-discrimination in employment; and that it agrees to pursue positively and aggressively the principle of equal opportunity in employment.

We agree specifically:

1. To establish or observe employment policies which affirmatively promote opportunities for minority persons at all job levels.

2. To communicate this policy to all persons concerned, including all company employees, outside recruiting services, especially those serving minority communities, and to the minority communities at large.

3. To take affirmative steps to hire minority employees within the company.

FIRM

TITLE OF PERSON SIGNING

SIGNATURE
DATE
Please include any additional information available regarding equal opportunity employment programs now in effect within your company:

Page 698 of 1852 ends

29 G. CERTIFICATION OF PRINCIPAL
CIP NO. 105 & 695
Annual Street Improvements and Parking Lot A Improvements I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for Workers' Compensation or to undertake selfinsurance in accordance with the provisions of that Code, and I will comply with such provisions before commencing the performance of the work of this Contract. (Section 1861, Labor Code.)
Signature:

Name:

Title:

Name of Company:

Page 699 of 1852 ends

30 H. DECLARATION OF ELIGIBILITY TO CONTRACT
[Labor Code Section 1777.1; Public Contract Code Section 6109] CIP NO. 105 & 695
Annual Street Improvements and Parking Lot A Improvements The undersigned, a duly authorized representative of the Contractor, certifies and declares that:

1. The undersigned Contractor is aware of Section 1771.1 and 1777.7 of the California Labor Code, which prohibit a Contractor or subcontractor who has been found by the Labor Commissioner or the Director of Industrial Relations to be in violation of certain provisions of the Labor Code, from bidding on, being awarded, or performing work as a subcontractor on a public works project for specified periods of time.

2. The undersigned Contractor is not ineligible to bid on, be awarded or perform work as a subcontractor on a public works project by virtue of the foregoing provisions of Sections 1771.1 or 1777.7 of the California Labor Code or any other provision of law.

3. The undersigned Contractor is aware of California Public Contract Code Section 6109, which states:
“(a) A public entity, as defined in Section 1100 [of the Public Contract Code], may not permit a Contractor or subcontractor who is ineligible to bid or work on, or be awarded, a public works project pursuant to Section 1777.1 or 1777.7 of the Labor Code to bid on, be awarded, or perform work as a subcontractor on, a public works project. Every public works project shall contain a provision prohibiting a Contractor from performing work on a public works project with a subcontractor who is ineligible to perform work on the public works project pursuant to Section 1771.1 or 1777.7 of the Labor Code.” “(b) Any Contract on a public works project entered into between a Contractor and a debarred subcontractor is void as a matter of law. A debarred subcontractor may not receive any public money for performing work as a subcontractor on a public works Contract, and any public money that may have been paid to a debarred subcontractor by a Contractor on the project shall be returned to the awarding body. The Contractor shall be responsible for the payment of wages to workers of a debarred subcontractor who has been allowed to work on the project.”

4. The undersigned Contractor has investigated the eligibility of each and every subcontractor the undersigned Contractor intends to use on this public works project, and determined that none of them is ineligible to perform work as a subcontractor on a public works project by virtue of the foregoing provisions of the Public Contract Code, Sections 1771.1 or 1777.7 of the Labor Code, or any other provision of law.

I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct. Executed this day of
, at (place of execution),
California.

Signature:

Name:

Title:

Name of Company:

Page 700 of 1852 ends

31 I. NON-COLLUSION DECLARATION
CIP NO. 105 & 695
Annual Street Improvements and Parking Lot A Improvements The undersigned declares:

I am the ___________________ of ______________________________, the party making the foregoing Bid.

The Bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation. The Bid is genuine and not collusive or sham. The Bidder has not directly or indirectly induced or solicited any other Bidder to put in a false or sham bid. The Bidder has not directly or indirectly colluded, conspired, connived, or agreed with any Bidder or anyone else to put in a sham bid, or to refrain from bidding.

The Bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the Bid Price of the Bidder or any other Bidder, or to fix any overhead, profit, or cost element of the Bid Price, or of that of any other Bidder. All statements contained in the Bid are true. The Bidder has not, directly or indirectly, submitted his or her Bid Price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, to any corporation, partnership, company, association, organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham bid, and has not paid, and will not pay, any person or entity for such purpose.

Any person executing this declaration on behalf of a Bidder that is a corporation, partnership, joint venture, limited liability company, limited liability partnership, or any other entity, hereby represents that he or she has full power to execute, and does execute, this declaration on behalf of the Bidder.

I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct and that this declaration is executed on __________ [date], at ___________________ [city], ___________________ [state].

NAME OF BIDDER

SIGNATURE OF BIDDER

ADDRESS OF BIDDER

CITY STATE ZIP

Page 701 of 1852 ends

32 J. REFERENCES OF WORK
CIP NO. 105 & 695
Annual Street Improvements and Parking Lot A Improvements Provide names, addresses, phone numbers and email addresses for at least three public agencies for which Bidder has performed similar work within the past five years.

All contact information must be current.

1. _______________________________________________________________________ Name and Address of Public Agency
_________________________________________________________________________ Name and Telephone Number of Public Agency’s Project Manager _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ Name and Detailed Description of Project
___________________________________ ___________________________________ Original Contract Amount Original Date of Completion
________________________ ___________________________________ Final Contract Amount Final Date of Completion
Number of Change Orders ____________

2.______________________________________________________________________ Name and Address of Public Agency
_________________________________________________________________________ Name and Telephone Number of Public Agency’s Project Manager _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ Name and Detailed Description of Project
___________________________________ ___________________________________

Page 702 of 1852 ends

33 Original Contract Amount Original Date of Completion ________________________ ___________________________________ Final Contract Amount Final Date of Completion
Number of Change Orders ____________

3.________________________________________________________________________ Name and Address of Public Agency
_________________________________________________________________________ Name and Telephone Number of Public Agency’s Project Manager _________________________________________________________________________ _________________________________________________________________________ _________________________________________________________________________ Name and Detailed Description of Project
___________________________________ ___________________________________ Original Contract Amount Original Date of Completion
________________________ ___________________________________ Final Contract Amount Final Date of Completion
Number of Change Orders ____________
For additional References, please add separate sheets.

NAME OF BIDDER

SIGNATURE OF BIDDER DATE

Page 703 of 1852 ends

34 K. SUBCONTRACTORS LIST
CIP NO. 105 & 695
Annual Street Improvements and Parking Lot A Improvements In compliance with the "Subletting and Subcontracting Fair Practices Act" being Sections 4100-4113 of the Government Code of the State of California, and any amendments thereto, each Bidder shall set forth below: (a) the name and location of the place of business, (b) the California Contractor license number, (c) the DIR public works Contractor registration number unless exempt pursuant to Labor Code Sections 1725.5 and 1771.1, and (d) the portion of the work which will be done by each subcontractor who will perform work or labor or render service to the prime Contractor in or about the construction of the work or improvement in an amount in excess of one-half (1/2) of one percent (1%) of the prime Contractor's total bid, and shall further set forth the portion of the work which will be done by each subcontractor. Only one subcontractor for each such portion shall be listed.

Notwithstanding the foregoing, if the work involves the construction of streets and highways, then the Bidder shall list each subcontractor who will perform work or labor or render service to the Bidder in or about the work in an amount in excess of one-half of one percent (0.5%) of the Bidder’s Total Bid Price or $10,000, whichever is greater. No additional time shall be granted to provide the below requested information.

If the Contractor fails to specify a subcontractor for any portion of the work to be performed under the Contract, he shall be deemed to have agreed to perform such portion himself, and he shall not be permitted to subcontract that portion of the work except under the conditions hereinafter set forth.

Subletting or subcontracting of any portion of the work to which subcontractor was designated in the original bid shall only be permitted in cases of public emergency or necessity, and then only after a finding reduced to writing as a public record of the legislative body of the Owner.

We propose to use the following listed subcontractors as per Public Contract Code Section 4100 et seq.: List all Subcontractors. The subcontractor shall be licensed for the type of work they are performing.

Sub-Contractors Name: Address:

Description of Work:

CSLB Contractor License No. DIR Registration No.

Phone No. Dollar Amount of Work & % of Work

Page 704 of 1852 ends

35 Sub-Contractors Name: Address:

Description of Work:

CSLB Contractor License No. DIR Registration No.

Phone No. Dollar Amount of Work & % of Work
Sub-Contractors Name: Address:

Description of Work:

CSLB Contractor License No. DIR Registration No.

Phone No. Dollar Amount of Work & % of Work
Sub-Contractors Name: Address:

Description of Work:

CSLB Contractor License No. DIR Registration No.

Phone No. Dollar Amount of Work & % of Work
Sub-Contractors Name: Address:

Description of Work:

CSLB Contractor License No. DIR Registration No.

Phone No. Dollar Amount of Work & % of Work

Page 705 of 1852 ends

36 Percent of work to be performed by sub-Contractors: % (Note: 50% of work is required to be performed by general Contractor) For additional Sub-Contractors, please add additional sheet(s)

Page 706 of 1852 ends

37 L. IRAN CONTRACTING ACT CERTIFICATION
(Public Contract Code Section 2200 et seq.)
As required by California Public Contract Code Section 2204, the Contractor certifies subject to penalty for perjury that the option checked below relating to the Contractor’s status in regard to the Iran Contracting Act of 2010 (Public Contract Code Section 2200 et seq.) is true and correct:

The Contractor is not:
(1) identified on the current list of person and entities engaged in investment activities in Iran prepared by the California Department of General Services in accordance with subdivision (b) of Public Contract Code Section 2203; or
(2) a financial instruction that extends, for 45 days or more, credit in the amount of $20,000,000 or more to any other person or entity identified on the current list of persons and entities engaging in investment activities in Iran prepared by the California Department of General Services in accordance with subdivision (b) of Public Contract Code Section 2203, if that person or entity uses or will use the credit to provide goods or services in the energy sector in Iran.

The City has exempted the Contractor from the requirements of the Iran Contracting Act of 2010 after making a public finding that, absent the exemption, the City will be unable to obtain the goods and/or services to be provided pursuant to the Contract.

The amount of the Contract payable to the Contractor for the Project does not exceed $1,000,000.

Signature:

Printed Name:

Title:

Firm Name:

Date:

Note: In accordance with Public Contract Code Section 2205, false certification of this form shall be reported to the California Attorney General and may result in civil penalties equal to the greater of $250,000 or twice the Contract amount, termination of the Contract and/or ineligibility to bid on Contracts for three years.

Page 707 of 1852 ends

38 M. PUBLIC WORKS CONTRACTOR REGISTRATION CERTIFICATION Pursuant to Labor Code sections 1725.5 and 1771.1, all Contractors and subcontractors that wish to bid on, be listed in a bid proposal, or enter into a Contract to perform public work must be registered with the Department of Industrial Relations. See http://www.dir.ca.gov/Public-Works/PublicWorks.html for additional information.

No bid will be accepted nor any Contract entered into without proof of the Contractor’s and subcontractors’ current registration with the Department of Industrial Relations to perform public work.

Bidder hereby certifies that it is aware of the registration requirements set forth in Labor Code sections 1725.5 and 1771.1 and is currently registered as a Contractor with the Department of Industrial Relations.1
Name of Bidder: ________________________________________ DIR Registration Number: ________________________________ DIR Registration Expiration: ______________________________ Small Project Exemption: ______ Yes or ______ No
Unless Bidder is exempt pursuant to the small project exemption, Bidder further acknowledges:

1. Bidder shall maintain current DIR registration for the duration of the project.

2. Bidder shall maintain a current DIR registration for the duration of the project.

3. Bidder shall include the requirements of Labor Code sections 1725.5 and 1771.1 in its Contract with subcontractors and ensure that all subcontractors are registered at the time of bid opening and maintain registration status for the duration of the project.

4. Failure to submit this form or comply with any of the above requirements may result in a finding that the bid is non-responsive.

Name of Bidder
Signature
Name and Title
Dated
1 If the Project is exempt from the Contractor registration requirements pursuant to the small project exemption under Labor Code Sections 1725.5 and 1771.1, please mark “Yes” in response to “Small Project Exemption.”

Page 708 of 1852 ends

39 N. FLEET COMPLIANCE CERTIFICATION
The California Air Resources Board (“CARB”) implemented amendments to the In-Use OffRoad Diesel-Fueled Fleets Regulations (“Regulation”) which are effective on January 1, 2024 and apply broadly to all self-propelled off road diesel vehicles 25 horsepower or greater and other forms of equipment used in California. A copy of the Regulation is available at https://ww2.arb.ca.gov/sites/default/files/barcu/regact/2022/off-roaddiesel/appa-1.pdf. Bidders are required to comply with all CARB and Regulation requirements, including, without limitation, all applicable sections of the Regulation, as codified in Title 13 of the California Code of Regulations section 2449 et seq. throughout the term of the Project. Bidders must provide, with their Bid, copies of Bidder’s and all listed subcontractors the most recent, valid Certificate of Reported Compliance (“CRC”) issued by CARB. Failure to provide valid CRCs as required herein may render the Bid non-responsive.

INSTRUCTIONS TO BIDDERS

COMPLIANCE WITH CARB REGULATIONS
The City is a Public Works Awarding Body, as defined under Title 13 California Code of Regulations section 2449(c)(46). Accordingly, Bidders must submit, with their Bids, a valid Certificate of Reported Compliance (“CRC”) for the Bidder’s and its listed subcontractors fleet (including any applicable leased equipment or vehicles) . Bidder must complete and submit the Fleet Compliance Certification, on the form included in the bid package. Failure to provide a valid CRC for the Bidder’s fleet, and for the fleets of all listed subcontractors, or failure to complete the Fleet Compliance Certification, may render the Bid non-responsive.

Fleet Compliance Certification.

Bidder hereby acknowledges that they have reviewed the California Air Resources Board’s policies, rules and regulations and are familiar with the requirements of Title 13, California Code of Regulations, Division 3, Chapter 9, effective on January 1, 2024 (the “Regulation”). Bidder hereby certifies, subject to penalty for perjury, that the option checked below relating to the Bidder’s fleet, and/or that of their subcontractor(s) (“Fleet”) is true and correct:

The Fleet is subject to the requirements of the Regulation, and the appropriate Certificate(s) of Reported Compliance have been attached hereto.

The Fleet is exempt from the Regulation under section 2449.1(f)(2), and a signed description of the subject vehicles, and reasoning for exemption has been attached hereto.

Bidder and/or their subcontractor is unable to procure R99 or R100 renewable diesel fuel as defined in the Regulation pursuant to section 2449.1(f)(3). Bidder shall keep detailed records describing the normal refueling methods, their attempts to procure renewable diesel fuel and proof that shows they were not able to procure renewable diesel (i.e. third party correspondence or vendor bids).

Page 709 of 1852 ends

40 The Fleet is exempt from the requirements of the Regulation pursuant to section 2449(i)(4) because this Project has been deemed an Emergency, as defined under section 2449(c)(18). Bidder shall only operate the exempted vehicles in the emergency situation and records of the exempted vehicles must be maintained, pursuant to section 2449(i)(4).

The Fleet does not fall under the Regulation or are otherwise exempted and a detailed reasoning is attached hereto.

Name of Bidder:_________________________________________________ Signature: __________________________________________________ Name: __________________________________________________ Title: __________________________________________________ Date: __________________________________________________

Page 710 of 1852 ends

41 V. CONTRACT DOCUMENTS
CIP NO. 105 & 695
Annual Street Improvements and Parking Lot A Improvements

Page 711 of 1852 ends

42 A. CONTRACT AGREEMENT
This Construction Agreement (“Agreement”) is made and entered into as of the date executed by the Mayor and attested to by the City Clerk, by and between [INSERT CONTRACTOR NAME] (hereinafter referred to as "CONTRACTOR") and the City of Hermosa Beach, California, a municipal corporation (hereinafter referred to as "CITY").

R E C I T A L S
A. Pursuant to the Notice Inviting Sealed Bids for CIP NO. [INSERT NUMBER] [INSERT PROJECT NAME] (“Project”), bids were received, publicly opened, and declared on the date specified in the notice; and
B. On [INSERT DATE], City’s City Council declared CONTRACTOR to be the lowest responsible Bidder and accepted the bid of CONTRACTOR; and
C. The City Council has authorized the Mayor to execute a written Contract with CONTRACTOR for furnishing labor, equipment, and material for the CIP No. [INSERT NUMBER], [INSERT PROJECT NAME] in the City of Hermosa Beach.

NOW, THEREFORE, in consideration of the foregoing and the mutual covenants herein contained, it is agreed:

1. GENERAL SCOPE OF WORK: CITY agrees to engage CONTRACTOR and CONTRACTOR agrees to furnish all necessary labor, tools, materials, appliances, and equipment for and do the work for the CIP NO. [INSERT NUMBER] [INSERT PROJECT NAME]in the City of Hermosa Beach. The work shall be performed in accordance with the Plans and Specifications dated [INSERT DATE], (the “Specifications”) on file in the office of the City Clerk and in accordance with bid prices set forth in CONTRACTOR’S Bid Proposal and in accordance with the instructions of the City Engineer.

2. INCORPORATED DOCUMENTS TO BE CONSIDERED COMPLEMENTARY: The Contract documents for the aforesaid project shall consist of the Notice Inviting Bids, Instructions to Bidders, Bid Proposal, Builders General Provisions, Standard Specifications 2021 edition, Special Provisions, Exhibit A and Exhibit B, and all referenced specifications, details, standard drawings, and appendices; together with this Agreement and all required bonds, insurance certificates, permits, notices and affidavits; and also, including any and all addenda or supplemental agreements clarifying, amending, or extending the work contemplated as may be required to insure its completion in an acceptable manner. All of the provisions of said Contract documents are made a part hereof as though fully set forth herein. This Contract is intended to require a complete and finished piece of work and anything necessary to complete the work properly and in accordance with the law and lawful governmental regulations shall be performed by CONTRACTOR whether set out specifically in the Contract or not. Should it be ascertained that any inconsistency exists between the aforesaid documents and this written agreement, the provisions of this Agreement, the Builders General Provisions and the Standard Specifications, in that order, shall control.

Collectively, these Contract documents constitute the complete agreement between CITY and CONTRACTOR and supersede any previous agreements or understandings.

Page 712 of 1852 ends